HomeMy WebLinkAboutExecutive 2017Toronto and Region
Conservation
Authority
Executive Committee Meeting #1/17 was held at TRCA Head Office, on Friday, March 3,
2017. The Chair Maria Augimeri, called the meeting to order at 9:30 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Jennifer Innis
Member
Mike Mattos
Member
Jennifer McKelvie
Member
Anthony Perruzza Member
PRESENT VIA TELECONFERENCE
Michael Di Blase Member
Colleen Jordan Member
ABSENT
Glenn De Baeremaeker Member
Chris Fonseca Member
RES.#B1/17 - MINUTES
Moved by: Jennifer Innis
Seconded by: Michael Di Biase
THAT the Minutes of Meeting #12/16, held on February 3, 2017, be approved.
CARRIED
1
Section I — Items for Authority Action
RES.#B2/17 - FOOD OPERATIONS, RETAIL AND PUBLIC EVENTS AT BLACK
CREEK PIONEER VILLAGE AND KORTRIGHT CENTRE FOR
CONSERVATION
Request to Undertake Request for Proposal Process. Request for approval
to undertake a Request for Proposal process to explore the potential of
leveraging new business partnerships to grow and diversify food
operations, retail offerings and public events at Black Creek Pioneer
Village and Kortright Centre for Conservation.
Moved by: Vincent Crisanti
Seconded by: Mike Mattos
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) operates Black Creek Pioneer Village (BCPV) and the
Kortright Centre for Conservation (KCC);
AND WHEREAS TRCA staff leads the management of food operations, retail services and
public events at both locations;
AND WHEREAS staff continues to seek ongoing improvement to business models to
increase net revenues and improve service delivery related to food operations, retail
services and public events;
THEREFORE LET IT BE RESOLVED THAT a Request for Proposal process be undertaken
to explore how new business partnerships may contribute to growing and diversifying
BCPV's and KCC's food operations, retail offerings and public events.
CARRIED
BACKGROUND
Toronto and Region Conservation Authority owns and operates Black Creek Pioneer Village and
the Kortright Centre for Conservation — two dynamic educational facilities located in
well-preserved heritage and natural settings. Through an extensive roster of educational
programs, BCPV and KCC create engaging educational experiences for adults, families and
school groups. At both BCPV and KCC, this educational goal is supported by services including
food operations, retail offerings and public events. These services add significant value to each
facility, and generate net revenue to help offset operating costs. The following section explores in
greater depth the types of services offered at each location.
Black Creek Pioneer Village
BCPV is a living history museum where 135,000+ annual visitors experience what life was like in
1860s Ontario. With more than 40 distinct heritage buildings, beautiful gardens and sprawling
greenspace, heritage -breed farm animals, and a collection of approximately 50,000 historical
artifacts, BCPV offers a charming and immersive environment for learning about the rich history
of the Toronto region. Students, families and adults are engaged through public programs,
curriculum -linked school programs, engaging exhibitions, and annual special events. BCPV
works closely with community partners to design and deliver many of these offerings.
2
BCPV operates as a community museum and as such is mandated to: protect and preserve its
historic collections; make its collections accessible to the public; facilitate learning through public
programs, school programs, and special events; and, demonstrate a commitment to financial
sustainability and stability. One of the ways in which BCPV supports its financial sustainability
and stability is through service offerings that diversify and boost its revenue streams. These
services include:
a. Food Operations – BCPV manages a commercial kitchen that is used to cater both private
and public functions (i.e., Mother's Day brunch; Thanksgiving dinners; and Christmas
dinners). The site features seven dedicated event spaces: the Victoria Room, the Victoria
Green, the Canada West Room, the Weston Room, the Pioneer Patio, the Halfway House
and the Event Pavilion — where weddings, corporate events and social gatherings are held.
BCPV coordinates and manages all functions hosted onsite. Additionally, BCPV operates a
seasonal snack bar in the historic Village.
b. Retail – BCPV operates a Gift Shop and cafe in its Visitors' Centre. This operation is
seasonal and targets all visitors to the site. The Gift Shop features pioneer -themed goods,
books, kids' toys, decor, housewares, and a unique selection of locally made woodworks and
art pieces.
c. Public Events – BCPV coordinates and hosts annual special events that cater to the site's
diverse audiences. While many of these events are directly tied to the site's educational
objectives and/or are focused on fostering community-based partnerships (e.g., Pioneer
Harvest Festival), others are thematically unique and distinct from the facility's educational
and partnership -based activities.
Kortright Centre for Conservation
KCC is a leading environmental education centre that welcomes as many as 100,000 visitors
annually. The facility is nestled among pristine woodlands and features some of Canada's most
cutting edge sustainable and renewable technologies—including the BRE Innovation Park and
two LEED (Leadership in Energy and Environmental Design) platinum certified houses that are
used as educational demonstration sites. KCC offers environmental programs for school groups
and sustainable technology workshops for public audiences and professionals. As well, the site
features special events throughout the calendar year, including TRCA's annual Sugarbush
Maple Syrup Festival, which is carried out in collaboration with partner Credit Valley
Conservation Authority. In addition to these activities, KCC offers services that help diversify and
enhance its revenue streams. These services include:
a. Food Operations – KCC manages a commercial kitchen that is used primarily to cater
private functions, such as weddings, corporate meetings and events. The facility features
outdoor ceremony locations as well as three event halls including the Glass House, the Main
Hall and the Forest Gallery. It also features a theatre space that is used for corporate
meetings and presentations.
b. Retail – KCC operates a Gift Shop that targets visiting school groups and families attending
educational programs and events. The Gift Shop features Canadian souvenirs, maple syrup
products and other giftwares.
G7
c. Public Events — KCC coordinates and hosts annual special events that cater to the site's
diverse audiences. Similarly to BCPV, these events are closely tied to the site's educational
objectives and/or are focused on fostering community-based partnerships (e.g., Sugarbush
Maple Syrup Festival); however, some are thematically unique and distinct from the facility's
educational and partnership -based activities.
RATIONALE
Staff is looking to grow and diversify food operations, retail offerings and public events at BCPV
and KCC. The timing of this is significant as a number of new initiatives aimed at improving the
caliber of both facilities are also underway. These initiatives include infrastructure improvements
at both BCPV and KCC, as well as a major fundraising campaign for BCPV. The first phase of this
campaign is being led by The Living City Foundation and aims to raise $10 million to: (a)
implement a new programming model that will transform how visitors interact with the site; (b)
resolve the facility's maintenance backlog; and (c) complete capital enhancements that will
improve energy conservation, site safety and site accessibility.
As these new initiatives progress, it is important to think holistically about how the
revenue -generating services of food operations, retail and public events currently perform, and
how they might be optimized to better support the broader goals and objectives of each facility.
These services are important sources of net revenue, and with a more viable and sustainable
business model they can be enhanced to yield even greater returns.
In order to identify an appropriate business model and determine whether this model can be
implemented and managed internally or whether there is value in leveraging the expertise and
resources of one or more external partners, staff will complete the following exercises:
(1) Business Planning Process - will allow staff to identify how food operations, retail offerings
and public events at KCC and BCPV may be enhanced. This process involves assessing
existing services to determine the benefits and challenges of the business model that is
currently in place and develop a more suitable model that will eliminate barriers to growth.
For example: BCPV's private functions are restricted to a few areas of the historic Village. By
rethinking how these events are structured and by activating the historic Village in new and
exciting ways, BCPV can expand its reach and enhance its event offerings to prospective
clientele. The business planning process will establish important benchmarks related to
projected net revenue growth, which will help staff assess the viability of external proposals;
and ultimately, this process will allow staff to determine how best to restructure operations.
(2) RFP Process - will allow staff to explore how partnerships may be integrated into an
augmented business model for food operations, retail offerings and public events at KCC and
BCPV. Staff will be seeking one or more external partners who value and recognize the
uniqueness of both sites — BCPV's heritage buildings and landscape along with KCC's
beautiful natural setting — and who share TRCA's commitment to protecting and preserving
them for generations to come. The RFP process will ask proponents to bid on one or more of
the respective services for one or both locations.
The advantages of engaging external partners may include the following:
a. Invest in infrastructure —With strong interest in the quality and capacity of the site,
a partner would make capital leasehold improvements to optimize facility
infrastructure. This would reduce capital costs for TRCA while enhancing the
functionality and resiliency of facility infrastructure.
El
b. Leverage expertise, capacity and resources — With demonstrated strategy, staff
capacity, technical infrastructure, access to resources and expertise, a partner would
be well-equipped to effectively manage proposed services. This would ensure that
services meet the highest possible standard of excellence.
c. Improve risk management — Working with a partner would mean sharing liability
risks; as a result, TRCA's exposure to risk would be lessened. Additionally, a partner
would enhance TRCA's financial sustainability by providing a sustained source of
revenue via the leasehold agreement process.
d. Increase marketing reach — With the support of a partner, BCPV and KCC would be
exposed to new markets, engagement strategies and branding opportunities. This
has the potential to greatly expand the reach of TRCA.
The aim of these exercises will be to identify a business model that best allows BCPV and KCC
to grow and sustain their respective operations and infrastructure. The process may identify
capital investments that are required to improve the business model. Alternatively, the process
may identify potential partners who are prepared to invest, operate and pay a lease fee plus
percentage to TRCA. The overarching goals involve attracting and supporting larger audiences
and raising the profile of TRCA.
FINANCIAL DETAILS
In 2016, BCPV's food operations and retail sales net $169,100 in revenue; and at KCC, these
services net $307,000 in revenue. While these net revenues are positive, staff is exploring how to
grow these figures through the implementation of a new business model and the possible
engagement of new business partners.
DETAILS OF WORK TO BE DONE
With a business planning process underway, TRCA will undertake an RFP process, which may
begin with a call for Expressions of Interest, to ascertain the best business model and course of
action for optimizing BCPV's and KCC's business operations. Staff will return to the Authority for
approvals as required, and are committed to keeping BCPV's and KCC's dedicated teams
engaged and informed throughout the transition.
Report prepared by: Stephanie Demetriou, extension 6424
Emails: sdemetriou(atrca.on.ca
For Information contact: Derek Edwards, extension 5672
Emails: dedwards(&trca.on.ca
Date: February 21, 2017
:�J
RES.#B3/17 - TOWN OF AJAX
Request for Permanent Easement Required for a Drainage Swale
Town of Ajax, Regional Municipality of Durham, Duffins Creek Watershed,
CFN 56097. Receipt of a request from Town of Ajax to provide a
permanent easement for the construction of a drainage swale, located
north of the property municipally known as 176 Riverside Drive, in the
Town of Ajax, Regional Municipality of Durham, Duffins Creek watershed.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Town of Ajax to provide a
permanent easement for construction of a drainage Swale, located north of 176 Riverside
Drive, in the Town of Ajax, Regional Municipality of Durham, Duffins Creek watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with Town of Ajax in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of 0.03
hectares (0.07 acres), more or less, said property being described as Part of Block 2,
Registered Plan 342, Town of Ajax, Regional Municipality of Durham and being designated
as Part 1 on a Draft Plan prepared by Pearson and Pearson Surveying Limited on January
30, 2017 under project number 0622, be granted in favour of the Town of Ajax;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs be paid
by the Town of Ajax;
THAT the Town of Ajax is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from the
granting of this permanent easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigating measures being
carried out to the satisfaction of TRCA staff, at the expense of Town of Ajax;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of the Town of Ajax;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by the
Town of Ajax prior to the commencement of construction;
THAT said easement be subject to the approval of the Minister of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
L49
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
The Town of Ajax has requested a permanent easement across TRCA-owned lands for the
purpose of constructing a drainage swale, located north of 176 Riverside Drive, Town of Ajax,
Regional Municipality of Durham. The project includes construction of a drainage swale, post
construction grading, as well as temporary set up and work space.
The subject TRCA-owned lands were acquired from Jack H. Elliot, on December 21, 1984 under
the Duffins Creek Flood Plain Lands Project.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by
TRCA staff, revegetated with native woody and herbaceous plant material in accordance
with existing TRCA landscaping guidelines. A landscape plan will be prepared as part of
the permit application submission.
A map illustrating the location of the permanent easement is attached.
FINANCIAL DETAILS
Town of Ajax has agreed to assume all legal, survey and other costs involved in completing this
transaction.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(cDtrca.on.ca
For Information contact: Brandon Hester, extension 5767,
Jae R. Truesdell, extension 5247
Emails: bhester(a)trca.on.ca, jtruesdell(a)trca.on.ca
Date: February 9, 2017
Attachments: 1
7
A ch ent 1 /
rmanent
Ea ement
Legend
TorontoYORK
DURHAM
Conservation
(or The Living City- SITE y
PEEL
LTORONTO
lake oarana
RES.#B4/17 - THE REGIONAL MUNICIPALITY OF PEEL
Request for Permanent Easements Required for Watermain Replacement
and an Existing Sanitary Sewer Line
City of Brampton, Regional Municipality of Peel, Etobicoke Creek
Watershed, CFN 56787. Receipt of a request from The Regional
Municipality of Peel for permanent easements required for the Main Street
South Watermain Replacement and an existing unregistered sanitary
sewer line between Harold Street and Elgin Drive, in the City of Brampton,
Regional Municipality of Peel, Etobicoke Creek watershed.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from The Regional Municipality of
Peel for permanent easements required for watermain replacements and an existing
sanitary sewer line, City of Brampton, Regional Municipality of Peel, Etobicoke Creek
watershed.
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with The Regional
Municipality of Peel in this instance;
THEREFORE LET IT BE RESOLVED THAT permanent easements containing 0.15 hectares
(0.38 acres), more or less, said property being described as Part of Lots 8 & 9, Registered
Plan Br -29 designated as Parts 1-5 inclusive on draft plan prepared by J.D. Barnes Ltd.
reference No. 16-30-988-00-A; Part of Blocks B and N and Part of Eldomar Avenue S.E.,
Registered Plan 581 designated as Part 4 on draft plan prepared by J.D. Barnes Ltd.
reference No. 16-30-988-00-13; Part of Lot 4, Concession 1 W.H.S and part of Block D,
Registered Plan 635 designated as Part 4, 5, 8, 10, 13 to 15 inclusive on draft plan prepared
by J.D. Barnes Ltd., reference No. 16-30-988-00-C, City of Brampton, Regional Municipality
of Peel, be granted in favour of The Regional Municipality of Peel;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs to be
paid by The Regional Municipality of Peel;
THAT The Regional Municipality of Peel is to fully indemnify TRCA from any and all claims
from injuries, damages or costs of any nature resulting in any way, either directly or
indirectly, from the granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigation measure being
carried out to the satisfaction of TRCA staff, at the expense of The Regional Municipality
of Peel;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of The Regional Municipality of Peel;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by The
Regional Municipality of Peel prior to the commencement of construction;
CEJ
THAT said conveyance be subject to the approval of the Minister of Natural Resources
and Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
The Regional Municipality of Peel has requested permanent easements required for the Main
Street South Watermain Replacement and an existing sanitary sewer line, City of Brampton,
Regional Municipality of Peel, Etobicoke Creek watershed. A temporary easement of 0.33
hectares (0.66 acres) required for staging and construction is also being requested.
The Regional Municipality of Peel's State of Good Repair program identified the need to replace
aging watermain infrastructure in the vicinity of Main Street South and Eldomar Avenue, in the
City of Brampton. Initial plans were to construct within the existing road right-of-ways and
permanent easements, however, through the Municipal Class Environmental Assessment
process, the preferred route for construction and operation of the watermain was in the vicinity of
the Etobicoke Creek, crossing on greenspace owned by TRCA and the City of Brampton. The
new watermain will allow for the removal of redundancies within the current water supply system
and improve operations in the project area.
The Regional Municipality of Peel is also requesting permanent easements for an existing
sanitary sewer line. The sanitary sewer line was built in May 1957 and was not identified during
the acquisition of the subject lands from The Corporation of the Town of Brampton in April 1972
and October 1973.
The subject lands were acquired from A&P Mikulich on December 30, 1966 and The Corporation
of the Town of Brampton on April 14, 1972 and on October 15, 1973 under the Etobicoke Creek
Flood Plain Lands Project.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by
TRCA staff, revegetated with native woody and herbaceous plant material in accordance
with existing TRCA landscaping guidelines. A landscape plan will be prepared as part of
the permit application submission.
A sketch illustrating the location of the permanent easement and temporary easement is
attached.
FINANCIAL DETAILS
The Regional Municipality of Peel has agreed to assume all legal, survey and other costs involved
in completing this transaction.
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewongRtrca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 3, 2017
Attachments: 1
10
Legend
EZA
L�
Perrrl�
411r-�.Easern
t • Temporar�r
I aseme
ii
J
Permanent.
Easement
%%fin-n-,—,� � 1 �V • .
Conservation
for The Living City -
Lake On(arin
RES.#B5/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Highland Creek Watershed
Your Home Developments (Deer Run) and 1583690 Ontario Limited, CFN
56859 and CFN 56860. Acquisition of properties located north of Highway
2A and east of Medowvale Road, municipally known as 6435, 6441 and
6443 Kingston Road, in the City of Toronto, under the "Greenlands
Acquisition Project for 2016-2020", Flood Plain and Conservation
Component, Highland Creek watershed.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.07 hectares (0.16 acres), more or
less, of vacant land, located north of Highway 2A and east of Meadowvale Road, said land
being Part of Lot 4, Concession 1 designated as Parts 11, 18 and 21 on Plan 66R-28972,
municipally known as 6435, 6441 and 6443 Kingston Road, in the City of Toronto be
purchased from Your Home Developments (Deer Run) and 1583690 Ontario Limited;
THAT the purchase price be the nominal sum of $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Trudy Peterson, Project Coordinator, acting as agent for
the owners.
Prior to acquisition, access to the subject lands will be achieved through its frontage on an interior
street that will be conveyed to the City of Toronto within the adjacent development lands.
Attached is a sketch illustrating the location of the subject lands
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Highland Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the subdivision application, TRCA staff established the limits of the open space land.
Contiguous vegetation covers the entirety of the subject lands.
12
TAXES AND MAINTENANCE
This parcel of land will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewongCa)trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae R. Truesdell, extension 5247
Emails: ewongCcDtrca.on.ca, jtruesdell(a)trca.on.ca
Date: February 7, 2017
Attachments: 1
13
bject
Legend
L�
Conservation
for The Living City-
Section II — Items for Executive Action
RES.#B6/17 - APPOINTMENT OF ENFORCEMENT OFFICER
Jackie Burkart. Appointment of Enforcement Officer to administer
Regulation of Development, Interference with Wetlands and Alterations to
Shorelines and Watercourses (Ontario Regulation 166/06, as amended).
Moved by: Colleen Jordan
Seconded by: Jack Heath
THAT Jackie Burkart be appointed as Enforcement Officer for the purposes of enforcing
Development, Interference with Wetlands and Alterations to Shorelines and Watercourses
Regulation (Ontario Regulation 166/06, as amended) by Toronto and Region Conservation
Authority (TRCA), pursuant to Section 28 of the Conservation Authorities Act.
CARRIED
BACKGROUND
The Conservation Authorities Act provides for a conservation authority to appoint enforcement
officers to enforce its regulations. There is several TRCA staff who currently have this
designation, both for the purpose of enforcing TRCA's Ontario Regulation 166/06, as amended,
and for authorizing the issuance of permits approved by the Executive Committee under the
Regulation.
RATIONALE
Ms. Jackie Burkart has recently been appointed to the position of Senior Planner within the
Planning, Greenspace and Communications division. In this position, she has the responsibility
for supervising TRCA's regulation services associated with the review and approval of
applications. The appointment as Enforcement Officer will allow her to authorize the issuance of
approvals for the work that she supervises and will enable her to assist with the enforcement of
the Regulation as required.
Report prepared by: June Little, extension 5756
Emails: ilittlePtrca.on.ca
For Information contact: Carolyn Woodland, extension 5214
Emails: cwoodlandPtrca.on.ca
Date: February 15, 2017
15
RES.#B7/17 - FLOOD MONITORING WEBSITE REDEVELOPMENT PROJECT
Award of Contract #10002482. Award of Contract #10002482 for
professional consulting services to redevelop and upgrade Toronto and
Region Conservation Authority's flood monitoring website.
Moved by: Jack Heath
Seconded by: Jennifer McKelvie
THAT Contract #10002482 for the redevelopment of Toronto and Region Conservation
Authority's (TRCA) flood monitoring website be awarded to Simalam Incorporated at a
total cost not to exceed $132,000.00 plus HST, it being the highest ranked proposals;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of
15% of the contract cost as a contingency allowance if deemed necessary;
AND FURTHER THAT authorized TRCA officials be directed to take any action necessary
to implement the agreement including obtaining any required approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
TRCA is mandated through Section 21 of the Conservation Authorities Act to reduce the adverse
effects of flooding. TRCA maintains a rotation of flood duty officers (FDO) on a 24/7 basis to
monitor watershed conditions and prepare flood warning messages to distribute to the public and
partner agencies including municipalities, police, fire, ambulance, school boards, Toronto Transit
Commission, GO Transit and other organizations. Early flood warning is an effective way for
these agencies to prepare for flooding thereby reducing risk to the public and damage to property.
On August 19, 2005 an intense storm hit Toronto and caused widespread damage. At the time
TRCA was using Water Survey Canada's (WSC) stream gauge network to get information on
water levels during the storm. WSC's stream gauge network required FDO's to manually access
gauges via dial-up modems to retrieve water level data. The process to do this was unreliable and
time consuming. Often gauges would have technical issues that would cause the gauge to lose
connection. Valuable time was wasted trying to connect to these gauges.
During the post event analysis it was determined that the WSC stream gauge network was not
adequate for flood forecasting needs. TRCA decided to implement its own stream gauge
network utilizing the most modern real-time technology available at the time. This would allow
TRCA to locate stream gauges at critical flood vulnerable sites, receive real-time water level data
automatically and develop an alarm system to notify FDO's if water levels reached
pre -determined thresholds. The new network would also be able to receive real-time dam
reservoir levels so that operational requirements could be determined quickly.
In the summer of 2006 TRCA published a Request for Proposal to develop a real-time flood
warning network and a website to display the data. RFP #2/06 was awarded to Sutron
Corporation. The original contract included four real-time stream gauges, data collection
software and a website to display incoming data. Since 2006 the network has grown to 18
stream gauges and 20 precipitation gauges.
16
The flood monitoring website, www.trcagauging.ca, is used extensively by FDO's and other
TRCA staff to evaluate watershed conditions by accessing real time stream flow, water level and
precipitation information in watersheds throughout TRCA's jurisdiction. The website provides
access to large amounts of real time monitoring data and is used as a resource for TRCA's
municipal partners and the general public to access information pertaining to
hydro-meteorological data and flood information. The website has assisted external agencies
including City of Toronto, York Region, Credit Valley Conservation and others with their flood
response protocols.
However, the trcagauging.ca website is now 10 years old and is in need of major upgrades to
continue providing flood forecasting data. The software platform on which it is based is outdated
and does not have the functionality of modern web platforms. Modern web security protocols
cannot be integrated into the existing website. Integration with current web tools is not possible.
TRCA is seeking to redevelop the website in order to modernize it to current web development
standards as well as improve upon the visual and technical functionalities for a variety of different
users. Additionally, the website currently does not meet the Accessibility for Ontarians with
Disabilities Act (AODA, 2005) that all business operations in Ontario are required to meet.
RATIONALE
The TRCA Flood Monitoring Website Redevelopment Project aligns with Leadership Strategy#2
Objective 4 in TRCA's Strategic Plan which mandates the "Reduction or elimination of existing
flood risks in our jurisdiction." Real time data on watershed conditions is critical for TRCA to
provide municipal partners and the public early warning of possible flood conditions.
On July 22, 2016 TRCA published an Expression of Interest (EOI) on Biddingo.com to determine
the interest of the marketplace and to create a short list of qualified consultants with experience in
real-time data acquisition and complex website development. Twenty-nine vendors downloaded
the EOI documents from biddingo.com.
The EOI evaluation team was comprised of TRCA staff that currently maintains and use the
existing website (Jing Cao, Rhianydd Phillips and Rita Lucero). After reviewing the EOI's the
evaluation team determined that five consultants had the technical expertise and project
experience to undertake the Flood Monitoring Website Redevelopment Project. The approved
vendors were:
4DM Incorporated;
Digital Echidna;
EarthFx Incorporated;
FCV Technologies Limited;
Simalam Incorporated.
TRCA distributed a Request for Proposal (RFP) to all five approved vendors on December 9,
2016. The RFP contained all the technical requirements to complete this project. The RFP also
contained an upset limit of $150,000 (excluding HST). TRCA received the following proposals
by the January 27, 2017 submission deadline:
4DM Incorporated;
Digital Echidna;
Simalam Incorporated.
17
The Procurement Opening Committee opened the proposals on January 27, 2017. During the
opening, the proposal submitted by 4DM Inc. was deemed "incomplete" as it did not contain
completed copies of the required Responding Consultant's Certificate and Fee Proposal (RFP
Attachments 1 and 2 respectively). Therefore this proposal was disqualified and not considered
as part of the evaluation and selection process.
Members of the Proposal Selection Committee (Jamie Duncan, Rita Lucero and Dana Khademi)
evaluated the proposals using the scoring method listed in the RFP. Proposal scoring criteria is
listed in Table 1 and proposal scoring averaged results are listed in Table 2.
Table 1: RFP Scoring Criteria
Criteria
Description
Weight
Project Team qualifications and experience, including
Expertise of
resumes and references
Project Team and
Qualifications and experience sub -consultants (if
Similar Projects -
applicable)
10
Scope and
Appropriate allocation of staff resources
Magnitude
Brief descriptions of similar projects including;
# of projects similar in budget
# of projects similar in scope
Understanding of
Demonstrated understanding of the project requirements,
Project and Scope
scope and objectives
20
of Work
Detailed description of the workplan
Innovative ideas and approaches to meeting the project
Approach /
objectives
Methodology
Identification of project limitations or difficulties and
45
proposed solutions
Ability to incorporate the "Additional Website
Considerations" into overall site design and functionality.
Schedule, milestones and timelines consistent with project
Schedule
requirements
10
Ability to commit to timing objectives
Detailed cost breakdown as set out in Attachment 2
Itemized cost of additional services anticipated by
Reasonableness
Consultant
of Cost
Cost of additional meetings not included in Part B
10
Total upset fee limit for the Services and Expenses, which
shall include all third party costs and disbursements,
excluding HST
Complete proposal (meets format and submission
Conformance with
requirements)
the terms of the
Project Budget
5
RFP
Project Schedule
Completed Attachments 1 & 2
Table 2: RFP Proposal Scoring
Criteria
Weight
N
Proponent
Simalam /
EarthFx
Digital
Echidna
Expertise of Project Team and Similar Projects -
Scope and Magnitude
10
8.9
6.1
Understanding of Project and Scope of Work
20
16.3
8.0
Approach / Methodology
45
38.2
19.6
Schedule
10
8.8
5.6
Reasonableness of Cost
10
8.3
9.0
Conformance with the
terms of the RFP
5
5.0
5.0
TOTAL SCORE %
100%
85.5%
53.3%
TOTAL PROPOSED PROJECT COST
$132,000
$103,950
Based on the proposal scoring it was determined that the proposal submitted by Simalam offered
the best combination of service and value to meet the objectives of this project.
Simalam demonstrated a suitable understanding of the project and the scope of work involved for
the redevelopment of the flood monitoring website. Simalam provided an effective and cost
saving approach and methodology to significantly improve the presentation, functionality and user
experience of the website. They outlined how they would address each of the specific project
requirements and proposed a fair timeline schedule within the specified upset limit of the Project.
The total cost proposed by Simalam for the project is $132,000 (plus HST), which already
includes a 10% contingency for hours needed to complete the project due to the uncertain nature
of defining user -centric scope. Cost savings come primarily from the use of a free Content
Management System (WordPress) which allows for expanded versatility and customization. The
website will also benefit from improved security and authenticated logins for specific TRCA flood
staff, while maintaining a portal for municipal partners and the general public to view flood
monitoring related data and information. Simalam also provided and confirmed specific technical
considerations such as the implementation of the provincial WCAG 2.0 AA compliance standards
that assists persons with visual impairments access information.
Simalam also stood apart from the other proponents by choosing to partner up with EarthFx, a
Toronto-based water resource software consulting firm, to deliver expertise on hydrograph
analysis and user experience design.
Simalam provided a list of three references in which all gave excellent reviews of the staff, the
quality of work and meeting timeline objectives. Simalam is also the company who recently
redeveloped the corporate trca.ca website and comes highly recommended by TRCA Information
Management and Marketing staff. Thus, Simalam also provides an advantage in being able to
ensure a design scheme consistent with the TRCA corporate website.
Digital Echidna provided an unsatisfactory proposal due to not providing sufficient technical
details or reference to specific requirements as outlined in the RFP document. Most of the
proposal contains general content and little understanding of the scope of work for this specific
project. The workplan proposed discusses general project management practices of the company
and minimal effort was made to address the specific needs outlined by TRCA.
19
Although Digital Echidna proposed the lowest cost for the project at $103,950, plus HST, the
discrepancy in cost appears to be primarily attributed to lower staff rates and less hours assigned
to the project. Additionally, the overall allocation of hours for critical phases in the project was not
satisfactory to the Selection Committee and was deemed to potentially impact the quality of the
end product, particularly for the initial Discovery and Planning and Testing and Quality Assurance
phases of the Project. This is especially concerning when they have not demonstrated a good
understanding of the scope of work for this project.
As mentioned previously, a third proposal submitted by 4DM Inc. was disqualified by the Opening
Committee on January 27, 2017, for not having included the required Responding Consultant's
Certificate and Fee Proposal (RFP Attachments 1 and 2 respectively). Therefore this proposal
was not considered as part of the Evaluation and Selection process.
Based on the above, the Selection Committee is recommending that the contract be awarded to
Simalam Incorporated.
FINANCIAL DETAILS
Funding for this project is available from accounts 107-01 (Flood Warning Equipment and
Modelling) and 107-02 (Flood Risk Management and Communication) funded jointly by the
regions of Peel, York and Durham, and the City of Toronto.
Report prepared by: Craig Mitchell, 647-212-2410
Emails: cmitchelICcDtrca.on.ca
For Information contact: Craig Mitchell, 647-212-2410
Emails: cmitchellPtrca.on.ca
Date: February 9, 2017
20
Section III — Items for the Information of the Board
RES.#B8/17 - ONTARIO MUNICIPAL BOARD HEARING
Results of Hearings July 2015 to January 2017. Summary of results of
Ontario Municipal Board Hearings that Toronto and Region Conservation
Authority participated in from July 2015 to January 2017.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THAT the staff report on the results of Toronto and Region Conservation Authority (TRCA)
participation in Ontario Municipal Board (OMB) Hearings be received.
CARRIED
BACKGROUND
At Executive Committee Meeting #7/13, held on September 13, 2013, the Executive Committee
requested that staff report back on the results of all OMB Hearings for which TRCA staff is
involved. Acting on the Committee's direction, staff has previously reported back on the status of
OMB Hearings for the period of September 2013 to October 2014 and November 2014 to June
2015. This report provides a status of all OMB Hearings for the time period of July 2015 to
January 2017. Staff will continue to report back to the Executive Committee on the status of
OMB hearings on an annual basis.
During the reporting period of this staff report, TRCA staff from Planning and Development,
Planning Ecology and Water Resources were involved in resolving seven OMB cases across the
TRCA jurisdiction without proceeding to full hearings, and participated in resolving several
appeals to the City of Vaughan New Official Plan and City of Brampton Secondary Plan Area 47
Official Plan Amendment.
TRCA staff continues to be involved in 24 OMB cases across TRCA's jurisdiction, including six in
Peel Region, 11 in York Region, six in the City of Toronto and one in the Town of
Whitchurch-Stouffville. Staff remains involved in appeals to Official Plans and Secondary Plans
including North -Leslie Secondary Plan, Markham Official Plan, Vaughan Official Plan and City of
Brampton Secondary Plan Area 47, for which there are several appellants to each case. Staff
has represented TRCA at these OMB proceedings and is working with the parties in an effort to
resolve TRCA's issues. Should TRCA's issues not be resolved and staff needs to be engaged in
a contested hearing, staff will take forward a report to the Executive Committee requesting
approval to attain legal counsel and defend TRCA's interests at the hearing.
RATIONALE
Summaries of each OMB case for which staff was involved and TRCA's issues were resolved
during the reporting period are organized by municipality and outlined in Attachment 1.
DETAILS OF WORK TO BE DONE
Planning and Development staff will continue to report annually to the Executive Committee on
results of OMB proceedings for which TRCA is involved.
Report prepared by: Leilani Lee -Yates, extension 5370
Emai Is: Ilee-vatest&trca.on.ca
For Information contact: Carolyn Woodland, extension 5214
Emails: cwoodland(&trca.on.ca
Date: February 9, 2017
Attachments: 1
21
Attachment 1: Ontario Municipal Board Hearing — Results of Hearings July 2015 to January 2017
File Information I Applicant and I Description of Application I TRCA Issue(s)
Municipality:
Proponent and
Part Lot 20, Concession 10
Protection of KNHFs and buffers.
Town of Caledon
Appellant:
(ALBION)
Revisions to the draft plan so that
address water quantity, quality and
hearing.
Southeast corner of Mount
no development blocks encroach in
OMB Case No.:
Riteland
Wolfe Road and Old Church
KNHFs and buffers
PL140631
Development
Road
Submission of an acceptable FSR
PL141202
Corporation / Halls
DPS Application (21T-
that provides an adaptive
TRCA Staff Contact:
Lake Estates
98001 C) and ZBA
Application (RZ 98-07)
management approach.
Additional LID measures for SWM
Adam Miller
Board gave an oral decision to
TRCA Staff Contact:
28 -lot estate residential plan
purposes.
TRCA CFN:
approve the OPA, and DPS with
conditions. The site-specific
of subdivision on 56.2 ha
Maintaining overall water balance
40105
site.
and mitigating impacts to the PSWs.
TRCA CFN:
Hydrogeological and groundwater
hearing conference is set for
50583
concerns.
Mav 2017.
Submission of a reforestation plan
to address MNRF requirements, as
well as provide for improved
Results/Status
TRCA obtained Party status to
the hearing.
Originally, this matter was for a
three-week OMB hearing.
In leading up to the hearing, the
parties were able to settle issues
and Minutes of Settlement were
entered into.
A one -day OMB settlement
hearing was held on December
7, 2015.
OMB granted draft plan approval
subject to conditions of draft
plan approval, which incorporate
TRCA's requirements.
Municipality:
Proponent and
6600 Old Church Rd
Completion of final SWM strategy to
TRCA was a Party to the
Town of Caledon
Appellant:
OPA, ZBA, and DPS
address water quantity, quality and
hearing.
Functional Servicin2�rt (FSR)
Castles of Caledon
321 residential lots for a mix
downstream erosion control;
Town, TRCA and Appellant
OMB Case No.:
Corp.
of townhouse, linked and
Site level WB (i.e. groundwater
reached a settlement.
PL141202
single detached dwellings;
infiltration);
On September 21, 2015, the
with a park, woodlot block,
Feature -Based Water Balance for
Board gave an oral decision to
TRCA Staff Contact:
and SWM pond block on a
28.9 ha (71.38 ac) site.
the PSWs.
Delineation of natural heritage
approve the OPA, and DPS with
conditions. The site-specific
Leilani Lee -Yates
features and buffers.
ZBA is adjourned and a pre-
TRCA CFN:
Lot Grading affecting buffers.
hearing conference is set for
50583
Mav 2017.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin2�rt (FSR)
Feature Based Water Balance (FBWB)
Region of York
Municipality:
Proponent and
10961 and 11121 Leslie
The draft plan did not contemplate
TRCA staff attended the first
Town of Richmond
Appellant:
Street
the conveyance of natural hazard
Pre -hearing on January 27,
Hill
Leslie Elgin
OPA, ZBA, and DPS
lands and associated buffers to a
2015 and a second Pre -Hearing
Developments Inc.
826 residential units
public agency.
conference on June 8, 2015.
OMB Case No.:
consisting of singles, semi-
The applicable environmental
TRCA requested to be a Party to
PL 051129
detached and townhouse
buffers as prescribed in the North
the hearing.
blocks
Leslie Secondary Plan were not
TRCA staff entered into 'without
TRCA Staff Contact:
4 agricultural blocks to be
addressed at a future date
being integrated.
Sufficient information was not
prejudice' discussions with the
landowner to resolve the
Doris Cheng
1 future
provided to demonstrate no
outstanding issues related to the
TRCA CFN:
industrial/employment block
negative impacts to the sensitive
draft plan.
50043
2 mixed use blocks
environmental features in the area.
TRCA provided conditions of
1 neighbourhood
The extent of the proposed filling
draft plan approval to Town staff
commercial block
and grading within the
for the draft plan of subdivision
1 School Block
environmental buffers and the
in a letter dated August 15,
Parks and open space
natural heritage system continued to
2015.
blocks
be encroached upon.
TRCA attended a one day OMB
2 SWM Facility blocks
Some concerns related to the
settlement hearing on November
3 Blocks for Environmental
location and encroachment of
18, 2015.
Protection purposes
proposed SWM ponds and their
On December 7, 2015 the OMB
including Natural Hazard
outlet into the natural heritage
issued the decision approving
Lands and Environmental
system..
the ZBA and DPS.
Buffers, purposed on a 73
Additional pre -development
hectare (180 acre) site.
monitoring and assessment to
understand the potential impacts to
the PSWs and how those potential
effects could be mitigated.
Revisions to the DPS so the
delineation of the blocks would not
encroach into the Natural System.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin2a rt (FSR)
Feature Based Water Balance (FBWB)
Municipality:
Town of Richmond
Hill
OMB Case No.:
PL 110189 (OPA)
PL 150324 (ZBA
and SUB)
TRCA Staff Contact:
Proponent and
Appellant:
775377 Ontario Ltd.
0 Leslie Street
OPA, ZBA and DPS
applications
1 low density residential
block
1 medium density residential
block
1 office block
1 future development block
1 SWM block
3 park blocks
The applicable environmental
buffers as prescribed in the North
Leslie Secondary Plan were not
being integrated.
Sufficient information was not
provided to demonstrate no
negative impacts to the sensitive
environmental features in the area.
The extent of the proposed filling
and grading within the
environmental buffers and the
OPA originally appealed as part
of the Town of Richmond Hill
appeals to the Official Plan, of
which the TRCA was a party.
On May 11, 2016, the appellant
de -consolidated the appeal from
the Town's OP from case PL
110189 and consolidated the
appeal with the site specific
appeal under OMB PL 150324
Doris Cheng
TRCA CFN:
Stormwater Management (SWM)
2 Block for Environmental
natural heritage system continued to
for ZBA and DPS. As such,
55545
Protection purposes
upon.
be encroachedTRCA
continued with Party
including Natural Hazard
Some concerns related to the
Status on the appeals.
Lands and Environmental
location and encroachment of
Buffers, purposed on a 35
proposed SWM ponds and their
TRCA staff attended the first
hectare (84.5 acre) site.
outlet into the natural heritage
Pre -hearing for the site specific
system..
appeals on May 11, 2016 and
Additional pre -development
requested Party Status to the
monitoring and assessment to
hearing. TRCA then attended a
understand the potential impacts to
second Pre -hearing on
the PSWs and how those potential
effects could be mitigated.
September 13, 2016 updating
Revisions to the DPS so the
the Board on the ongoing
delineation of the blocks would not
discussions with the parties to
encroach into the Natural System.
the hearing.
TRCA staff entered into 'without
prejudice' discussions with the
landowner to resolve the
outstanding issues related to the
draft plan.
TRCA provided conditions of
draft plan approval to Town staff
for the draft plan of subdivision
in a letter dated January 25,
2017.
A one day settlement hearing is
scheduled for February 7, 2017,
in which staff attended.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin24rt (FSR)
Feature Based Water Balance (FBWB)
Municipality:
Proponent and
12860 Leslie Street
Stormwater Management pond
TRCA was a Party to the
Town of Richmond
Appellant:
Subdivisions
location, treatment of natural
hearing.
Hill
Sedgewick, Dickson
To convey a parcel of land
heritage features.
TRCA, appellant and Town
48, Longbody
for the creation of a new lot,
The subject lands are located
reached a settlement.
OMB Case No.:
Homes (West
together with all required
directly adjacent to lands that were
On July 4, 2016, the Board gave
PL040712
Gormley)
easements and right of
previously conveyed to TRCA as
a written decision to approve the
ways.
part of the Provincial land exchange
subdivisions with conditions -
TRCA Staff Contact:
to protect lands on the Oak Ridges
Moraine.
including TRCA's conditions of
draft approval
Quentin Hanchard
Enhanced on-site stormwater
TRCA CFN:
management controls were required
44756-44759
to address TRCA requirements. The
proponent agreed to the enhanced
measures, and has provided
modelling and a monitoring plan that
meets with the satisfaction of TRCA
staff.
The proposed stormwater
management pond outlet is
proposed in undesirable location on
lands previously conveyed to the
TRCA. Careful consideration of
alternatives, and a multi -pronged
approach to mitigate potential
impacts were required.
Municipality:
Proponent and
655 Creditstone Road
The proposed severance would
TRCA was a Party to the
City of Vaughan
Appellant:
Consent
fragment the Regional Storm
hearing.
Norampac Inc.
To convey a parcel of land
Floodplain and buffer.
TRCA and Appellant reached a
OMB Case No.:
for the creation of a new lot,
settlement.
PL150692
together with all required
On February 4, 2016, the Board
easements and right of
gave a written decision to
TRCA Staff Contact:
ways.
approve the Consent with
conditions: the Appellant was to
Anant Patel
obtain a TRCA permit in order to
TRCA CFN:
complete a cut and fill to remove
50296.15
the severed lot outside of the
floodplain.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin25rt (FSR)
Feature Based Water Balance (FBWB)
City of Toronto
Municipality:
Proponent and
41 Chatsworth Drive.
The applicant was not willing to
TRCA settled prior to the
City of Toronto
Appellant:
OPA, ZBA, Site Plan.
provide a 10 -meter buffer from the
hearing. However, the OMB
(North York
Parkset
6- and 7 -storey residential
furthest inland hazard or feature.
refused the application for other
Community Council
Developments Inc.
condominium building with
The applicant was not willing to
reasons.
Area)
three levels of below grade
convey the valleylands and buffer
TRCA accepted a 10 -meter
parking.
into public ownership through the
buffer from the stable top of
OMB Case No.:
planning process. As such, the
slope.
PL141182
building was proposed to adjoin the
TRCA accepted a conservation
10 -meter buffer and the applicant
easement over the valley and
TRCA Staff Contact:
did not want to provide a fence
between the buffer lands and the
10 -meter buffer lands from the
stable top of slope.
Jessica Bester
development.
The lands 10 meters inland from
TRCA CFN:
the stable top of slope were to
50357.01
be re -zoned with an open
space/hazard land zoning
category.
A native planting plan was to
take place in the 10 -meter
buffer.
Municipality:
Proponent and
840 Queens Plate Drive.
The applicant was not willing to
Minutes of Settlement, endorsed
City of Toronto
Appellant:
Site Plan.
convey portions of the open space
by the OMB, were executed on
(Etobicoke York
Royal Laser
17 -storey residential
block per the Notice of Site Plan
February 8, 2015. The
Community Council
Developments.
condominium building with
Approval Conditions.
settlement resulted in:
Area)
three levels of below grade
This condition was appealed to the
parking.
OMB by the applicant, because the
1) an increased buffer
OMB File No.:
applicant, as a new owner of the
conveyance behind the
MM 140068
property, disputed the nature of the
condominium building and the
conveyance. In addition, the
applicant retaining a small
TRCA Staff Contact:
applicant commenced a civil action
against TRCA and staff personally.
triangle of land on the north part
of the site; 2) the release of
Steven Heuchert
TRCA and staff from the civil
TRCA CFN:
action; 3) the majority of TRCA's
40148.25
legal costs being paid for by the
applicant; and 4) TRCA holding
a letter of credit to ensure the
conveyance takes place.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin21grt (FSR)
Feature Based Water Balance (FBWB)
APPEALS TO NEW OFFICIAL PLANS AND SECONDARY PLANS
Region of Peel
Municipality:
Applicant:
On September 10, 2014,
TRCA staff contributed to the
TRCA has Party status to the OMB
City of Brampton
City of Brampton
City of Brampton Council
development of the new
proceedings and has worked closely
approved the OPA (2006-
Secondary Plan environmental
with the City of Brampton and the
OMB Case No.:
Appellants:
105) to implement the
policies and was compelled to
appellants to resolve the appeals.
PL141189
Region of Peel,
Secondary Plan Area 47.
provide support to the City of
Mediation has been set for May 2017
MMAH, MTO, and
MMAH, MTO, Region of
Brampton on the appeals that
for site specific area related to
TRCA Staff Contact:
several landowner
groups appealed
Peel, and several landowner
groups appealed to the
were site specific and study
wide.
environmental policies. TRCA will
be a party to this proceeding.
Adam Miller
GTA West Corridor
OMB.
TRCA CFN:
protection area
In January 2017, the OMB
41230
policies and
partially approved the OPA,
schedules, land use
while procedures to resolve
policies and
the remaining appeals
schedules, and
continue before the OMB
environmental
(i.e., lands within the GTA
policies and
West Corridor Protection
schedules, of which
Area, as well as geographic
TRCA staff have an
specific areas).
interest.
York Region
Municipality:
Proponent:
New Official Plan for the
TRCA contributed to the
Settlements to date:
City of Vaughan
City of Vaughan
entire municipality including
development of the new OP
Portions of Vaughan Metropolitan
5 Secondary Plans.
environmental policies and
Centre
OMB Case No.:
Appellants:
The hearings & matters have
mapping and were compelled to
Woodbridge Centre SP
PL111184
Appealed for Lack of
been grouped by interest.
provide support to the City of
West Vaughan Employment Area
Decision by Region
Those subject to
Vaughan of the appeals that are
165 Pine Grove Road
TRCA Staff Contact
by approximately
development applications
site specific and City wide
York Major Holdings
June Little
164 Appellants of
will be scheduled for
Black Creek Renewal EA within
Rosenberg
which TRCA has an
separate hearings (about 30
the Vaughan Metropolitan
Block 40/47
TRCA CFN:
interest in about 75
appeals). The City has
Centre SP
lacobelli/Dufferin Vistas
38958
appeals.
resolved approximately 65.
Two site specific appeals within
Hwy 27/Langstaff GP
the Woodbridge SPA/
Novagel
Woodbridge Centre SP
Glady Smith
Vaughan Mills Centre SP and
Rice
the redesign of Black Creek
Portside
Site specific protection of
Natural Heritage Network
features and regulated areas.
About one third have settled to
date that TRCA has an interest in.
Official Plan Amendment (OPA) Centralized File Number (CFN)
Ministry of Natural Resources and
Forestry (MNRF)
Water Balance (WB)
Zoning By-law Amendment (ZBA)
Draft Plan of Subdivision (DPS)
Official Plan (OP)
Ontario Municipal Board (OMB)
Low Impact Development (LID)
Provincially Significant Wetland (PSW)
Stormwater Management (SWM)
Key Natural Heritage Features (KNF)
Special Policy Area (SPA)
Functional Servicin27Drt (FSR)
Feature Based Water Balance (FBWB)
RES.#B9/17 - SUMMARY OF PROCUREMENTS
2016 Annual Summary. Receipt of the 2016 end of year summary of
procurements approved by the Chief Executive Officer or his designate,
Executive Committee or the Authority.
Moved by: Mike Mattos
Seconded by: Jennifer Innis
THAT the summary of Toronto and Region Conservation Authority (TRCA) procurements
approved of $10,000.00 or greater value for 2016, be received.
CARRIED
BACKGROUND
At Authority Meeting #5/05, held on June 24, 2005, staff was requested to report to the Authority
on contracts let out by TRCA of $10,000 or greater value. Pursuant to this resolution, the
summary of these awarded contracts that are subject to the Purchasing Policy are found in
Attachment 1, with contract revisions recorded in Attachment 2. Excluded from the summary is
Schedule 'B' items (Attachment 3) as they are exempt from the approval requirements of the
Purchasing Policy, as outlined in Schedule A.
At Authority Meeting #6/13, held on July 26, 2013, a new Purchasing Policy was approved, with
changes in approval thresholds and purchasing methods (Attachment 4). Attachment 5 includes
the criteria as to why non-competitive procurement was appropriate for the particular goods or
services procured, as per Sections 9.2 & 9.3 of TRCA's Purchasing Policy.
As permitted under the approved policy, the Chief Executive Officer has designated senior staff,
generally including director and manager level positions, approval authority for purchases up to
$10,000 (exclusive of applicable taxes), which are not captured in this report.
The total purchases for TRCA in 2016 of $10,000 or greater, approved by the Authority, Executive
Committee or Chief Executive Officer/designate was approximately $27.9 million, including
contingencies and contract revisions, excluding HST. The comparable total for 2015 was $20.5
million.
Report prepared by: Kathy Stranks, extension 5264
Email: kstranks(&trca.on.ca
For Information contact: Kathy Stranks, extension 5264
Email: kstranks(&trca.on.ca
Date: January 24, 2017
Attachments: 4
Attachment 1
J
Contingency
Total Cost
Total
TRCA Division
Type
Project Name
Being Purchased
Awarded Bidder
Contract Cost
Cost
(Before
Vendors
Responded
(Responsible)
Revisions
Highest Ranked
Engineering services for flood
risk characterization and flood
Spring Creek Zone 7 Flood
risk mitigation analysis using
AECOM 30 Leek
Restoration and
Remediation Study
the Mike Flood 2D hydraulic
Cresent 4th Flood,
$40,648.95
$10,000.00
$50,648.95
5
5
Infrastructure
model for the Queen St E and
Richmond Hill, ON
Central Park Dr area in the
City of Brampton
Engineering services for the
2016 Don River Hydrology
development of a PCSWMMgECOM
Canada Limited
$146,435.10
$29,287.02
$175,722.12
7
6
Restoration and
Update
hydrologic model of the Don
Infrastructure
River watershed
Scarborough Bluffs West- EA
Environmental Assessment
Restoration and
Process Expert/Consultant
Process and Planning
AECOM CANADA LTD.
$42,330.00
$6,349.50
$48,679.50
27
4
Infrastructure
services
1025 Scarlett Road Slope
1025 Scarlett Road Slope
Restoration and
Stabilization Project
Stabilization Project- 30
Algonquin Bridge
$29,475.00
$9,825.00
$39,300.00
6
3
Infrastructure
Metre Temporary Bridge
Detailed design services for
AMEC FOSTER
Pine Valley SWM -Detailed
Pine Valley Drive Stormwater
WHEELER
Restoration and
Designs
Management Enhancement,
ENVIRONMENT &
$28,000.00
$0.00
$28,000.00
15
1
Infrastructure
including headwall and
INFRA
spillway repair.
Consulting Services for
Petticoat Creek Splash Pool
Petticoat Creek Aquatic
AQUA PLANS AQUATIC
$11,280.00
$1,128.00
$12,408.00
3
3
Parks and Culture
Phase 2 Engineering Work
Facility Phase 2 Construction
CONSULTANTS INC
(Splash Pool Elements)
Upper Highland Creek at
Ellesmere Pan Am Trail
Detailed design services for
AQUAFOR BEECH
$85,440.00
$12,000.00
$97,440.00
48
8
Restoration and
Connection
multi -use trail and bridges
LIMITED
Infrastructure
Hydraulic Analysis and
Sheffield Park - Bank
Detailed Design for Bank
Aquafor Beech Ltd.
$13,880.00
$1,388.00
$15,268.00
5
3
Restoration and
Stabilization Project
Stabilization Works at
Infrastructure
Sheffield Park
Albion Hills Conservation Area
Albion Hills Conservation Area
- Engineering Services for
Detailed Design of a new
Calder Engineering Ltd.
$17,485.00
$1,748.50
$19,233.50
4
3
Restoration and
Beach Septic System Project
Sewage System at the Beach
Infrastructure
Centre
J
gro
TRCA is seeking to retain the
Geotechnical Investigation for
services of a geotechnical
the Construction of
engineering firm to complete a
Recreational Fishing Nodes at
detailed investigation for the
Restoration and
Bluffer's Park Boat Launch,
construction of recreational
Cambium Inc.
$8,795.00
$1,319.25
$10,114.25
18
7
Infrastructure
Trout Pond, Coronation Park
fishing nodes at Bluffers Park
and Silver Birch Boathouse
Boat Launch, Trout Pond,
Coronation Park and Silver
Birch Boathouse.
Camping Reservation System
Campground Reservation
CAMIS INC.
$116,000.00
$14,000.00
$130,000.00
2
2
Parks and Culture
Software 2016 - 2017
Software 2016
TRCA 2016 - 2018 Waste and
Waste and Recycling Services
Canadian Waste
$110,854.00
$11,085.40
$121,939.40
4
4
Parks and Culture
Recycling Service Provider
2016- 2018
Management
Professional engineering and
landscape architectural design
Mud Creek/Don Valley Brick
services in supoort of
Works Culvert Replacement
replacing the failing culvert
COLE ENGINEERING
$26,497.60
$2,649.76
$29,147.36
8
3
Restoration and
Project
connection between Mud
GROUP LTD.
Infrastructure
Creek and The Don Valley
Brick Works wetland pond
features
Boyd Centre Yard Retrofits -
Project Management for the
design -build of a coverall
DeMan Construction
$203,706.60
$50,926.65
$254,633.25
83
4
Restoration and
Coverall storage structure
storage structure
Corp.
Infrastructure
Rockcliffe SPA 2D Model and
Engineering services for the
development of a MIKE Flood
DHI WATER R
$72905.00
$10,000.00
$82,905.00
7
4
Restoration and
Floodplain Mapping Update
2-dimensional hydraulic model
ENVIROMENT, INC.
Infrastructure
Don Mouth Mike Flood 2D
Engineering services for the
DHI WATER &
Restoration and
Model Development and
development of a MIKE Flood
ENVIROMENT, INC.
$79,215.00
$10,000.00
$89,215.00
3
3
Infrastructure
Analysis
213imensional hydraulic model
Albion Hills Lakeview Area
Albion Hills Lakeview Area
Dillon Consulting
$35,593.00
$7,118.60
$42,711.60
9
4
Parks and Culture
Detailed Design
Detailed Design
Consulting services for
Archdekin Park Bank
hydraulic analysis and detailed
Restoration and
Stabilization - Hydraulic
design at Archdekin Park
Ecosystem Recovery Inc.
$32,545.00
$3,254.50
$35,799.50
6
4
Infrastructure
Analysis and Detailed Design
Bank Stabilization Project,
City of Brampton.
2016 Comprehensive
Consulting services for a
Gallagher McDowall _F
Compensation and Pay Equity
Compensation Program for Associates
$100,045.00
$10,004.50
$110,049.50
7
7
CEO's Office
Review
TRCA staff
gro
31
Consulting services for
Melton Greenway Sanitary
hydraulic analysis and detailed
Restoration and
Protection Project - Hydraulic
design at Mallon Greenway
GHD INC.
$28,625.00
$2,862.50
$31,487.50
6
4
Infrastructure
Anaylsis and Detailed Designs
Sanitary Infrastructure
Protection Project
Hydraulic analysis and
Bran Road Outfall Repair and
detailed designs for an outfall
GHD INC..
.
900500
.
$290050
$31905.50
6
6
Restoration and
Bank Stabilization
repair and bank stabilization at
,
,
,
Infrastructure
Bran Road Site 1 and Site 2.
Marine archaeological
services for the nearshore
Western Waterfront Major
area (up to 5 m offshore) in
GOLDER ASSOCIATES
Restoration and
Maintenance Strategy-
support of the Western
LTD
LTD
$0.00
$28,657.00
7
2
Infrastructure
Marine Archaeology
Waterfront Major Maintenance
Strategy from Marie Curtis
Park to Ontario Place.
Redelmeier Pond
Engineering and Design
Decommissionning and
Services for Redelmeier Pond
GRECK & ASSOCIATES
$37,605.00
$7,521.00
$45,126.00
11
6
Restoration and
Restoration Project
Decommissioning and
LTD.
Infrastructure
Restoration Project
Detailed design for bank
Sun-Canadian Pipeline Bank
stabilization to protect an
exposed Sun-Canadian
Greek and Associates,
$12,895.00
$1,289.50
$14,184.50
7
3
Restoration and
Rehabilitation Detailed Design
Pipeline, decommissioned
Ltd.
Infrastructure
pipe.
L'AmoreauxlLower Duck
Stormwater Management
SWMP Clean-out and
Ponds Clean-out and
GROUND FORCE
$1,324,566.98
$331,141.75
$1,655,708.73
20
3
Restoration and
Restoration Project - Hauling
Restoration Project - Hauling
ENVIRONMENTAL INC.
Infrastructure
and Disposal of Sediment
and Disposal of Sediment.
Region of Peel Vulnerability
Writing of executive
Assessments - Summaries for
summaries of Vulnerability
hutchinson
$26,380.00
$190.00
$26,570.00
11
3
Watershed Strategies
Decision Makers
and Risk Assessments and
environmental
presentation on approach
Consulting Services for the
Community Engagement
Development of a Community
Indece Strategic
$50,215.00
$10,043.00
$60,258.00
78
5
Watershed Strategies
Project
Engagement Strategy for
Consulting Inc
TRCA
Third Party Facilitator
INDEPENDENT
Scarborough Waterfront
Services in support of the
ENVIRONMENTAL
$8,610.00
$1,722.00
$10,332.00
31
5
Watershed Strategies
Project- Third Party Facilitator
Scarborough Waterfront
CONSULTANTS
Project
Black Creek Pioneer Village
Development of Concept Plan
Restoration and
Project
for building envelope, HVAC
Intergral Group
$69,000.00
$6,900.00
$75,900.00
4
3
Infrastructure
and Lighting System
Request for Proposal - Safety
Acquisition of safety footwear
MARK'S WORK
$40,000.00
$6,000.00
$46,000.00
3
3
CEO's Office
Footwear
for TRCA staff
WEARHOUSE LTD.
31
32
Engineering services for the
development of a 2
Mallon Flood Characterization
Dimensional hydraulic model
MATRIX SOLUTIONS
$82,507.00
$12,000.00
$94,507.00
6
3
Restoration and
Study
to characterize flood risk in
INC.
Infrastructure
the community of Malton in
the City of Mississauga
Mud Creek Reach 2
Design Build Services for a
McPherson Andrews
$231,969.00
$0.00
$231,969.00
9
3
Restoration and
Pedestrian Bride
Contracting Ltd
Infrastructure
Stormwater management
Humber River SWM Criteria
quantity control criteria update
Restoration and
Update
for Humber River to reflect
MMM GROUP LIMITED
$29,350.00
$2,935.00
$32,285.00
3
3
Infrastructure
updated Humber hydrologic
modelling
Consulting services for
Development of Black Creek
detailed guidance of all future
Pioneer Village Interpretive
exhibits, programs and
Museum Planning
$32,700.00
$3,270.00
$35,970.00
4
1
Parks and Culture
Plan
interactive activities to ensure
Partners
a high quality visitor
experience
Design -Build -Maintain: Ten
GTAA - Design -Build -Maintain
Level 3 and Twenty-two Level
EVSE (EVCO Program)
2 Electric Vehicle Charging
Precise ParkLink Inc.
$1,806,158.00
$180,615.80
$1,986,773.80
25
6
Watershed Strategies
Stations at Toronto Pearson
International Airport
PYROTECHNICS FOR
Pyrotechnics for Caledon
CALEDON CANADA DAY
Canada Day 2016
Pyroworld
$11,503.44
$1,150.34
$12,653.78
3
1
Parks and Culture
2016
Chorley Park Switchback Trail
Professional services related
Connection - Detailed Design
to Chorley Park Switchback
Trail - Detailed Engineering
R.V. ANDERSON
$69,500.00
$10,425.00
$79,925.00
5
2
Restoration and
and Construction Advsio rY
Design/Costing and
ASSOCIATES LIMITED
Infrastructure
Services
Construction Review Services
Prioritization and maintenance
Western Waterfront Major
of shoreline erosion control
Maintenance Strategy-
structures along the north
Riggs Engineering
$177480.00
$17,748.00
$195,228.00
16
4
Restoration and
Coastal/Civil Engineer
shore of Lake Ontario
Limited
Infrastructure
between Marie Curtis Park
and Ontario Place
Boyd Retrofit Phase 3
Mechanical and ElectricalRoMar
Engineering
$10,500.00
$2,625.00
$13,125.00
3
2
Restoration and
Consulting Services
Infrastructure
Engineering services in
support of electrical site
Bolton Camp Hydro
assessment at Bolton Camp
Restoration and
Assessment for Phase 1
to support the site
Runge & Associates Inc.
$18,700.00
$1,870.00
$20,570.00
7
7
Infrastructure
Redevelopment
development and baseball
diamond as part of the Phase
1 redevelopment.
32
33
Black Creek Dam Safety
Dam Safety Review and
Sediment Management Plan
SANCHEZ
$61,730.00
$12,346.00
$74,076.00
6
6
Restoration and
Review
for Black Creek Dam.
ENGINEERING INC.
Infrastructure
Contract extension for supply
Contract extension for the
Sartor Environmental
of rental rates for operated
supply of rental rates for
Group and TMI
Restoration and
heavy construction equipment
operated heavy construction
Contracting and Rental
$4,000,000.00
$0.00
$4,000,000.00
2
1
Infrastructure
and dump trucks for 2016-
equipment and dump trucks
Ltd.
2017.
for 2016-2017.
Marine Archaeology Services -
SCARLETT JANUSAS
Restoration and
Gibraltar Point Erosion
Marine Archaeology Services
ARCHAEOLOGY INC.
$40,900.75
$12,270.23
$53,170.98
11
2
Infrastructure
Control Project
Scarborough Bluffs West EA-
Marine Archaeology
SCARLETT JANUSAS
$80,349.65
$12052.45
$92,402.10
12
2
Restoration and
Marine Archaeology
Consulting Services
ARCHAEOLOGY INC.
,
Infrastructure
Scarborough Bluffs West-
Coastal, Geotechnical and
Shoreplan Engineering
Restoration and
Coastal, Geotechnical and
Hydrogeological engineering
Limited
$248,000.00
$37,200.00
$285,200.00
23
3
Infrastructure
Hydrogeological Engineering
services
Bluffer's Park - Southwest
Detailed designs for the major
Headland and Beach Major
maintenance of the southwest
Shoreplan Engineering
$33,900.00
$6,780.00
$40,680.00
6
3
Restoration and
Maintenance Project
headland and beach in
Ltd.
Infrastructure
Bluffer's Park
Don Mills Road & Eglinton
Geotechnical investigation to
Avenue East Secondary Plan
complete a slobe stability
Sirati & Partners
$24,135.00
$0.00
$24,135.00
7
5
Restoration and
(Celestica) - Geotechnical
analysis for hazard limit
Consultants Ltd
Infrastructure
Investigation
delineation
Slope Stability and Erosion
219-226 Roslin Avenue Slope
Risk Assessment (SS&ERA)
Stability and Erosion Risk
to confirm the extent of risk six
Sirati & Partners
$22,708.00
$2,270.80
$24,978.80
6
6
Restoration and
Assessment
properties at the top of slope
Consultants Ltd.
Infrastructure
on Roslin Avenue, in the City
of Toronto
Locust Hill School House
Locust Hill School House -
Stantec
$10,000.00
$1,000.00
$11,000.00
2
2
Restoration and
Heritage RecordingInfrastructure
Automated Gate Entry System
Detailed Design for an
for Lakeview Waterfront
Automated Gate Entry System
Stephenson Engineering
$58,900.00
$5,890.00
$64,790.00
6
3
Restoration and
Connection Project
for Lakeview Waterfront
Infrastructure
Connection Project
First Aid Training for all TRCA
First Aid Training for 3 years
Toronto Paramedic
Services, Safe City
$35,000.00
$5,250.00
$40,250.00
7
5
CEO's Office
Staff
for about 300+ employees
Program
Engineering services for the
development of an updated
hydraulic model and
Downtown Brampton
engineered floodline mapping
VALDOR
$20,837.20
$4,000.00
$24,837.20
4
3
Restoration and
Floodplain Mapping Update
for the Downtown Brampton
ENGINEERING INC.
Infrastructure
Area within the Etobicoke
Creek watershed, through
Peel Region.
33
34
Engineering services for the
development of a
213imensional hydraulic
model, the initiation and
completion of Geotechnical,
Bolton Berm Hydraulic
Structural and Fluvial
VALDOR
Restoration and
Assessment and Remediation
assessment, and the
ENGINEERING INC.
$79.600.00
$10,000.00
$89,600.00
6
5
Infrastructure
Study
development of remediation
plan and restoration
alternatives for the existing
flood control infrastructure
located in the Bolton Special
Policy Area.
Supplemental bare root trees
Fall 2016 supplementary bare
and shrubs to meet the
VERBINNEN'S
$17,227.80
$2,584.17
$19,811.97
8
3
Restoration and
root stock
requirements of Fall 2016
NURSERY
Infrastructure
planting programs/projects
Consulting services for the
Waterhouse Executive
CEO Succession Process
recruitment of TRCA's CEO
Search
$35,000.00
$5,250.00
$40,250.00
7
7
CEO's Office
position.
Hydraulic Analysis and
WATER'S EDGE
Bolton Sanitary Infrastructure
Detailed Design for Sanitary
ENVIRONMENTAL
$33,390.00
$3,339.00
$36,729.00
6
2
Restoration and
Protection Project
Infrastructure Protection at
SOLUTIONS TEAM Ltd
Infrastructure
Bolton
Scarborough Waterfront
Traffic Impact Assessment
WSP CANADA INC.
$59,775.00
$5,977.50
$65,752.50
10
2
Watershed Strategies
Project - Traffic Impact Study
Consulting Services
Rouge Hydrology Update Peer
Update the hydrology and
Restoration and
Review
stormwater management
WSP/MMM Group
$14,961.20
$1,496.12
$16,457.32
4
2
Infrastructure
strategy
Lowest Bid
VMWARE SUPPORT AND
SUBSCRIPTION
PRODUCTION - TECHNICAL
SUPPORT - FOR VMWARE
VSPHERE ENTERPRISE
VMware Support and
EDITION (V. 6) - 1
2352242 Ont Inc o/a
$15,172.22
$1,517.22
$16,689.44
3
3
Planning Greenspace
Subscription
PROCESSOR-
SolutionStack
and Communications
EMERGENCYPHONE
CONSULTING - 3 YEAR -
24X7 - RESPONSE TIME: 30
MIN E -DOWNLOAD Normal
SA
34
35
Breakdown of Inventory per
Account Code: Acct# 014-01 -
20 x HP EliteDesk 800 G2 -
Corporate Replacements for
Desktops Acct# 014-01 - 20 x
HP 4GB DDR4 RAM Sticks
2352242 On[. Inc o/a
$16,753.00
$1,675.30
$18,428.30
3
3
Planningpace
Desktop and RAM
Acct# 131-01 - 2 x HP
SolutionStack
and Communications
EliteDesk 800 G2 - Desktops
Acct# 131-01 - 2 x HP 4GB
DDR4 RAM Sticks
Snow Removal for Various
Snow Removal 2016-2017
TRCA Residential Rental
AAA Landscaping Co Itd
$33,220.00
$3,322.00
$36,542.00
8
8
CEO's Office
Properties and Dam
Properties
Roof and Eaves Replacement
Roof and eaves trough
B
replacement at TRCA rental
AAA RoofMasters
$36,052.00
$7,210.40
$43,262.40
3
3
CEO's Office
homes in the Rouge Park.
Roof and Eaves Trough
Roof and Eaves Trough
AAA RoofMasters
$43,444.00
$8,688.80
$52,132.80
4
4
CEO's Office
Re lacement
Replacement
2016 Vehicle Acquisition
Acquisition of One Plug -In
ADDISON CHEVROLET-
$40,200.00
$4,020.00
$44,220.00
6
1
Restoration and
Hybrid Electric Vehicle
GMC-BUICK
Infrastructure
Golf Course hardware and
Golf course hardware,
Allturf
$22,061.64
$1,103.09
$23,164.93
3
1
Parks and Culture
fertilizer
fertilizers, and chemicals
Scarborough Waterfront
Third Party Environmental
Anneliese Grieve
Project - Third Party EA
Assessment Reviewer in
Strategic Environmental
$14,000.00
$2,800.00
$16,800.00
3
3
Watershed Strategies
Reviewer
support of the Scarborough
Planning Solutions
Waterfront Project
Marie Curtis Park Project
Installation of a Pedestrian
Anthony Furlano
$59,600.00
$5,960.00
$65,560.00
5
5
Restoration and
Barricade Railing
Construction
Infrastructure
Supply and delivery of labour,
Annie Crescent SWMP - Trail
equipment and materials to
APPCO PAVING LTD.
$14,000.00
$1,400.00
$15,400.00
8
2
Restoration and
repaving
complete asphalt paving
Infrastructure
works
UV Treatment Systems for
UV units and Filters on water
Education and
Lake Sl. George
lines in Buildings at Lake St.
AQUASOFT
$14,750.00
$1,475.00
$16,225.00
3
3
Outreach Division
George
Residential water treatment
Residential Water Treatment
equipment for TRCA
Equipment
residential rental homes in
Aquasoft
$45,032.00
$13,509.60
$58,541.60
6
3
CEO's Office
both TRCA basic and Rouge
Park portfolios
Purchase of paper products
Paper and envelopes for
ARIVA
$75,000.00
$11,250.00
$86,250.00
1
1
CEO's Office
for TRCA
TRCA business purposes
Petticoat Fencing Project
Installation of Post and Paddle
ATLAS FENCE
$20,475.00
$2,047.50
$22,522.50
6
2
Restoration and
Fencing Petticoat CA
for
TORONTO LTD.
Infrastructure
35
36
Eastville V&E
Purchase of a 20 foot mobile
ATS CONTAINER
$9.535.00
$953.50
$10,488.50
4
4
Restoration and
office
SERVICES
Infrastructure
Eastville V&E
Purchase of a 20 foot mobile
ATS CONTAINER
.
$973500
$97350
.
.
$1070850
5
4
Restoration and
office
SERVICES
,
,
Infrastructure
2016 Equipment Acquisition
Acquisition of One (1) Four
B.E. LARKIN
$19,150.00
$0.00
$19,150.00
12
4
Restoration and
Seat Off -Road Utility Vehicle
EQUIPMENT LIMITED
Infrastructure
Acquisition of One (1) Off-
BE LARKIN
Restoration and
2016 Equipment Acquisition
Road Utility Vehicle with Golf
EQUIPMENT LIMITED
$19,875.00
$1,987.50
$21,862.50
10
4
Infrastructure
Cage
Boyd Retrofit Project
Painting at Boyd Centre
Berkim Construction
$22,750.00
$5,687.50
$28,437.50
1
1
Restoration and
Infrastructure
Supply, Delivery and
Ergonomic office chairs for
Placement of Ergonomic
workspaces and meeting
BLAIR'S AT WORK
$88.949.00
$8,894.90
$97,843.90
19
4
Restoration and
Office Chairs - Head Office,
rooms, stackable chairs for
OFFICE FURNITURE
Infrastructure
Boyd Centre, Swan Lake
cafeterias
Acquisition of Two (2) 550 /
BLUE MOUNTAIN
Restoration and
2016 Vehicle Acquisition
5500 Crew Cab Chassis
CHRYSLER LIMITED
$141,632.00
$0.00
$141,632.00
7
4
Infrastructure
Trucks
Procurement of Caliper Stock
Purchase of caliper trees to
BROOKDALE
Restoration and
to meet Spring 2016 project
meet Spring 2016 project
TREELAND
$15,300.00
$0.00
$15,300.00
5
1
Infrastructure
requirements
requirements
NURSERIES LTD.
Septic Services
Septic Pumping Services
Broughton's Pumping
$95,700.00
$9,570.00
$105,270.00
4
2
Parks and Culture
Services
Range Balls
Supply and delivery of golf
Callaway Golf
$12,500.00
$1,250.00
$13,750.00
4
4
Parks and Culture
balls for use at driving range
Bluffers Park Channel
Channel Dredging Works for
CATALINA
$159,940.00
$20,000.00
$179,940.00
4
3
Restoration and
Dredging Works
Boat Traffic
EXCAVATING INC.
Infrastructure
Maintenance dredging of the
Coatsworth Cut Project
Coatsworth Cut channel by
CATALINA
$192,390.00
$28,858.50
$221,248.50
3
2
Restoration and
Ashbridges Bay Park in the
EXCAVATING INC.
Infrastructure
City of Toronto
EA Planning Department
Environmental Accessment
CDW CANADA
$9,462.58
$946.26
$10,408.84
3
3
Planning Greenspace
Order
Planning Department Order
and Communications
Backup Software
Veeam Backup Software
CDW CANADA
$11,358.76
$1,135.88
$12,494.64
4
4
Planning Greenspace
and Communications
Laptop, Docking Station, and
Restoration & Infrastucture
Monitor Upgrades for
CDW CANADA
$14,039.02
$1,403.90
$15,442.92
3
3
Planning Greenspace
Department Upgrade
Restoration & Infrastructure
and Communications
Department
New Staff & Pre -Corporate
New Staff & Pre -Corporate
CDW CANADA
$20564
05648
$2,.,.
$2262128
4
4
Planning Greenspace
Replacement Bulk Orders
Replacement Bulk Orders
,.80
and Communications
Corporate Replacements for
20 x HP EliteBook 850 G3 -
CDW CANADA
$33,075.78
$3,307.58
$36,383.36
3
3
Planning Greenspace
Laptops
Laptops
and Communications
36
37
Fitzpatrick Retrofits at Heart
Fitzpatrick Washroom
CELINI
$52,532.00
$7,500.00
$60,032.00
7
3
Parks and Culture
Lake Conservation Area
Renovations
CONSTRUCTION CO.
2016 Trail Projects - Bulk
Supply of pressure treated
CENTURY MILL
Restoration and
and rough cut lumber 2016
$22.557.87
$2,255.79
$24,813.66
2
2
Lumber Order
TRCA trails project.
LUMBER
Infrastructure
Rental Linen Services for
Linen Services
Various Events at BCPV and
Chair Decor
$23,684.70
$2,368.47
$26,053.17
13
4
Parks and Culture
Kortright Centre
Supply and Delivery of
SupplyandDelivery of
CHANTLER'S
Portable Toilet and Hygiene
ENVIRONMENTAL
$16,050.00
$1,605.00
$17,655.00
3
3
Parks and Culture
Rentals
Portable Toilets
SERVICES LTD.
2016 Equipment Acquisition
Acquisition of One (1) Large
CHAS. RICHARDS &
$110,290.00
$0.00
$110,290.00
24
14
Restoration and
Tracked Skidsteer
SONS LTD.
Infrastructure
Simcoe Point Marsh - Fishway
Water and Fish Control
Restoration and
Structure for Simcoe Point
Con Cast Pipe Inc.
$21,480.45
$2,148.05
$23,628.50
9
2
Structure Concrete Form
Marsh
Infrastructure
Purchase of CG trees and
Container grown trees and
CONNON NURSERIES-
Restoration and
shrubs to meet Spring 2016
A.V.K NURSERY
$12,400.50
$1,240.05
$13,640.55
10
1
shrubs
project requirements
HOLDINGS INC.
Infrastructure
Exterior Painting Rouge Park
Exterior Painting, TRCA
Roue Park Residential
Construction Solutions
$47,155.60
$14,146.68
$61,302.28
4
4
CEO's Office
Rental Portfolio
Dwellings
Business Cards & Envelopes
Printing of Business Cards
CREATIVE PATH
$36,924.00
$7,384.80
$44,308.80
3
3
CEO's Office
and Envelopes
DIGITAL IMAGING INC.
Reception Desk and Gift Shop
Manufacture, supply and
D & Designer
Education and
install nstall of reception counter
working Inc.
Woodworking
$17,000.00
$1,700.00
$18,700.00
4
3
Outreach Division
and gift shop counter
Humber Station Road
Demolition of Existing Farm
Delsan AIM
Restoration and
Environmental Services
$12,210.00
$1,221.00
$13,431.00
8
8
Farm House Project
Farm H
House
Inc.
Infrastructure
Swan Lake - Boathouse
Abatement and demolishing
Delsan-A.I.M.
Asbestos Abatement,
services for the removal of the
Environmental Services
n
E
$18,200.00
$2,730.00
$20,930.00
17
5
Restoration and
Removal and Building
Swan Lake boathouse,
Infrastructure
Demolition
including its foundation
Asphalt paving services
including placing of 19mm
West Hill Trail Realignment
crusher run base and chain
DIAMOND
$59,278.86
$5,927.89
$65,206.75
15
13
Restoration and
Project
link fence at four (4) locations
EARTHWORKS CORP.
Infrastructure
for West Hill Trail
Realignment Project
Award of contract for the
removal and disposal of 15
Bolton Camp - Removal and
PCB containing transformers
Restoration and
Disposal of PCB
located on the Bolton Camp
Dilisado Enterprises
$83,800.00
$8,380.00
$92,180.00
7
4
Transformers
Property, 13540 Caledon-King
Infrastructure
Townline South, Caledon,
Ontario.
37
L'Amoreaux/Lower Duck
DIVERSITY
SWMP Clean-out and
Solidification Reagent
TECHNOLOGIES
$412,753.00
$41,275.30
$454,028.30
11
3
Restoration and
Restoration Project- Supply
(polymer)
CORPORATION - DI-
Infrastructure
and Delivery of Polymer
CORP
Acquisition of Two (2) Hybrid
DON VALLEY NORTH
Restoration and
2016 Vehicle Acquisitions
TOYOTA a division of
$64,124.94
$6,412.49
$70,537.43
4
2
Compact SUVs
W EINS CANADA INC.
Infrastructure
2016 Vehicle Acquisition
Acquisition of One (1) Half
DONWAY FORD SALES
$33,226.00
$0.00
$33,226.00
9
3
Restoration and
Tonne Extended Cab Truck
LIMITED
Infrastructure
2016 Vehicle Acquisitions
Acquisition of One (1) One
DONWAY FORD SALES
$45,230.00
$4,523.00
$49,753.00
9
4
Restoration and
Tonne Crew Cab Truck
LIMITED
Infrastructure
Supply and delivery of 19mm
Valleywood Phase 3 - 19 mm
Crusher Run Limestone for
DUFFERIN
$54,810.00
$13,702.50
$68,512.50
7
5
Restoration and
Crusher Run Limestone
the installation of Valleywood
AGGREGATES
Infrastructure
Phase 3 trails
101 Exchange HVAC System
HVAC Balancing Serviceds
Dynamic Flow
$14,700.00
$3,675.00
$18,375.00
3
3
CEO's Office
Balancing
Mud Creek Restoration Reach
Storm Sewer Extension
DYNEX
$22608500
.
$2260850
.
.
$24869350
2
2
Restoration and
6
Project - Mud Creek Reach 6
CONSTRUCTION INC.
,
,
,
Infrastructure
Acquisition of One, One
EAST -COURT FORD
Restoration and
2016 Vehicle Acquisition
Tonne / 350 / 3500 Euro Style
LINCOLN SALES
$40,038.00
$4,003.80
$44,041.80
7
3
Cargo Van
LIMITED
Infrastructure
Acquisition of Two (2) Half
EAST -COURT FORD
Restoration and
2016 Vehicle Acquisition
Tonne Crew Cab Trucks with
LINCOLN SALES
$68,812.00
$6,881.20
$75,693.20
11
3
Gasoline Engine
LIMITED
Infrastructure
Roof and Eaves Trough
Roof and eaves trough
Replacement
replacement at TRCA rental
Eileen Roofing
$67,400.00
$13,480.00
$80,880.00
3
3
CEO's Office
homes in the Rouge Park
2273 Meadowvale Road
Asbestos Abatement at 2273
Environmental
$10,500.00
$1,050.00
$11,550.00
3
3
CEO's Office
Asbestos Abatement
Meadowvale Road.
Operations Inc.
Survey- Mid Humber Trail
Survey - Mid Humber Trail
ERTL Surveyors
$17,686.00
$0.00
$17,686.00
7
1
CEO's Office
Project
Project
Trail base construction
services including excavation,
West Hill Trail Realignment
placing of culvert pipes,
ESPOSITO BROS
$55,335.79
$5,533.58
$60,869.37
15
13
Restoration and
Project
placing stone base, and
CONSTRUCTION LTD.
Infrastructure
grading for West Hill Trail
Realignment Project
Roycroft Trail Improvements-
Esposito Bros
Restoration and
Roycroft Trail Improvements
Supply and Installation of
Construction Ltd.
$59,995.64
$8,999.35
$68,994.99
4
4
Infrastructure
Boardwal
2016 Equipment Acquisition
Acquisition of Two (2) Five
Excalibur Trailers /
$12,390.00
$0.00
$12,390.00
4
3
Restoration and
Tonne Low Bed Float Trailers
Excalibur Custom Carts
Infrastructure
Aerial and drone photography
Aerial/Drone Photography
for TRCA jurisdation,
Eye in the Sky
$30,000.00
$3,000.00
$33,000.00
4
3
Planning Greenspace
including project sites and our
photography
and Communications
lands.
Upftting equipment for new
Restoration and
2-16-152 Upfitting
TRCA vehicle 2-16-152 Ford
FARMBRO INC.
$12,735.00
$0.00
$12,735.00
3
3
Infrastructure
Transit T350 for Tradesperson
Catering for the 60th AGM
Catering Services for the 60th
FOOD FOR THOUGHT
$11,340.00
$2,835.00
$14,175.00
5
4
CEO's Office
Annual Meeting
CATERING
Construction services for
Williamson Park Ravine
Williamson Park Ravine -
pedestrian access
Slope Stabilzation and
improvements including soil
FOREST RIDGE
Restoration and
Pedestrian Access
nailing to stabilize ravine
LANDSCAPING INC.
$312,972.00
$62,594.40
$375,S6fi.40
60
4
Infrastructure
Improvements
slope, constructionn of timber
boardwalk/staircase and
footbridge on helical/concrete
footings, site restoration.
Bob Hunter Memorial Park
Installation of P -Gates and
Four Seasons Site
$24,375.00
$2,437.50
$26,812.50
5
3
Restoration and
Project
Asphalt PavingDevelopment
Infrastructure
Lakeview Waterfront
Paving Works for Access
FOUR SEASONS SITE
$48,000.00
$4,800.00
$52,800.00
9
5
Restoration and
Connection Project
Road East of Serson Creek
DEVELOPMENT LTD.
Infrastructure
Mailing System and Services
Purchase of mailing system
FP Francoty-Postalia
$9,536.15
$1,907.23
$11,443.38
3
3
CEO's Office
and services for five years
Canada Inc
2016 Equipment Acquisition
Acquisition of One (1) Triplex
G.C. DUKE
$40,510.00
$0.00
$40,510.00
9
3
Restoration and
Mower
EQUIPMENT LTD.
Infrastructure
Supply & delivery of steel
30 galvanized steel posts for
support of navigation lights
GANAWA COMPANY
$11,110.00
$0.00
$11,110.00
4
3
Restoration and
posts for navigation lighting
during construction operations
LTD.
Infrastructure
Fabrication, Delivery and
Temporary Bridge for
Unloading of a Portable
GANAWA COMPANY
$50,950.00
$5,095.00
$56,045.00
7
7
Restoration and
Lakeview Project
Highway Grade Temporary
LTD.
Infrastructure
Steel Bridge
Bellamy Ravine Major
Supply and Delivery of
approximately 300 tonnes of
Glenn W indrem Trucking
$9,450.00
$1,600.00
$11,050.00
5
5
Restoration and
Maintenance Project
240mm-400mm Rip Rap
Infrastructure
Supply and Delivery of approx.
TTP West Shore
330 tonnes of 3-8" round
Glenn W indrem Trucking
$13,530.00
$1,353.00
$14,883.00
5
5
Restoration and
stone to West Shore TTP
Infrastructure
Restoration project
tJ
Supply and Delivery of approx.
TTP West Shore
440 tonnes of 10-24" round
Glenn W indrem Trucking
$19,360.00
$1,936.00
$21,296.00
5
5
Restoration and
stone to West Shore TTP
Infrastructure
Restoration project
Bolton Camp Lagoon
Supply and Delivery ofGlenn
W indrem Trucking
$26,524.01
$2,652.40
$29,176.41
12
q
Restoration and
Various Aggregate Material
Infrastructure
Yonge York Mills Flood
Hauling and disposal of Table-
Restoration and
1 sediment at a Licensed
Glenn W indrem Trucking
$123,606.00
$12,360.60
$135,966.60
9
4
Control Channel (Reach 3)
Facility with Tri -Axles
Infrastructure
Denison Road Major
Supply and delivery of 4,500
Restoration and
tonnes of 150mm-300mm
Glenn Windrem Trucking
$141,300.00
$14,130.00
$155,430.00
9
6
Maintenance Project
gabion stone
Infrastructure
Snow removal services for the
2016-2017 season for the
following sites municipally
known as 7273 & 7277 14th
Snow Removal Services 2016
Avenue, Markham, 7277 14th
Green Earth Canada
Avenue, Markham, parking lot
$26,775.00
$2,677.50
$29,452.50
7
7
CEO's Office
-2017
only, 7401 Reesor Road,
Contracting Ltd
Markham, 1229 Bethesda
Side Road, Richmond Hill,
and 3540 Caledon King
Townline South, Bolton
Supply and Application of
Supply and Application of
Herbicide to Various
Herbicide to various TRCA
Greenlawn Ltd. Trugreen
$17,730.00
$1,773.00
$19,503.00
14
g
Restoration and
Restoration Sites - Spring
Meadow Sites
Infrastructure
2016
Planting - Supply and delivery
Supply and Delivery of
Restoration and
Shredded Pine Mulch for
Gro -Bark (Ontario) Ltd.
$20,176.75
$2,017.68
$22,194.43
15
3
of shredded pine mulch
Spring 2016 Planting Sites
Infrastructure
Supply and Delivery of
Supply and Delivery of
Restoration and
Shredded Pine Mulch for Fall
Shredded Pine Mulch for Fall
Gro -Bark (Ontario) Ltd.
$21,023.75
$2,102.38
$23,126.13
10
3
2016 Planting Sites
2016 Planting Sites
Infrastructure
Denison Road Slope
Restoration and
Stabilization and Erosion
Crane Works
Haggart Crane
$24,220.00
$12,500.00
$36,720.00
12
5
Control Project
Infrastructure
Supply and delivery of 21,000
Lakeview Waterfront
square metres of 360R non-
Hanes GEO
$16,220.00
$2,000.00
$18,220.00
4
q
Restoration and
Connection Project
woven geotextile or approved
Components
Infrastructure
equivalent
Patterson Creek 1-066
Rental of by-pass pumpRestoration
and
Sanitary Infrastructure
system including fuel
Hertz Equipment Rental
$35,516.39
$5,000.00
$40,516.39
5
5
Infrastructure
Protection Project
Purchase of CG trees and
Container grown trees and
Restoration and
shrubs to meet Spring 2016
HILLEN NURSERY INC.
$11,911.05
$1,191.11
$13,102.16
10
1
shrubs
project requirements
Infrastructure
tJ
41
Container grown trees
Purchase of CG Tree stock -
(deciduoud and coniferous) to
HILLEN NURSERY INC.
$15,543.40
$2,331.51
$17,874.91
9
9
Restoration and
Fall 2016
meet Fall 2016
Infrastructure
program/project requirements
A variety of species of 2G
Purchase of 2G CG shrub
container grown shrubs to
HILLEN NURSERY INC.
$82,585.15
$12,387.77
$94,972.92
6
2
Restoration and
stock - Fall 2016
meet fall 2016
Infrastructure
program/project requirements
Upwood Greenbelt Temporary
Installation of Temporary
HOBDEN
CONSTRUCTION
$31,275.00
$3,127.50
$34,402.50
7
7
Restoration and
Bridge
Pedestrian Bridges
COMPANY LTD.
Infrastructure
Turbidity Monitoring
Purchase of 2 continuous
HOSKIN SCIENTIFIC
$16,010.00
$1,601.00
$17,611.00
3
6
Restoration and
Equipment
monitoring turbidity sondes
LTD.
Infrastructure
2016 Grass Cutting RFQ
Grass cutting services for
Humberview
$9,600.00
$1,920.00
$11,520.00
4
4
CEO's Office
TRCA properties.
Maintenance Group
Pre -construction and post -
1025 Scarlett Road - 2016
construction CCN scan of
storm and sanitary
Infrastructure Intelligence
$26,300.00
$3,420.00
$29,720.00
5
2
Restoration and
CCN Inspection
infrastructure at Cruickshank
Services Inc.
Infrastructure
Park, City of Toronto
Survey/Reference plan work &
Legal survey and reference
installation of missing property
plan services from an Ontario
monuments for 10 properties
Land Surveyor firm for ten
Ivan B. Wallace Ontario
$13,220.00
$2,000.00
$15,220.00
7
4
Restoration and
located at 1 Katrine Road to
(10) properties located at 1
Land Surveyor Ltd.
Infrastructure
53 Riverhead Drive, in the City
Katrine to 53 Riverhead Drive,
of Toronto
in the City of Toronto.
Snow Removal Services
Snow Removal for Various
Various Residential Sites
TRCA Residential Rental
Ivy Property Services
$18,000.00
$1,800.00
$19,800.00
7
7
CEO's Office
2016-2017
Properties
Supply and Application of
Supply and Application of
Restoration and
Terraseeding at Amberlea and
Terraseeding to Amberlea site
J.Lipani Turf Group Ltd.
$18,161.50
$1,816.15
$19,977.65
7
2
Infrastructure
Brock 3 & 4 Sites
and Brock North Site 3 &4
Philips Lake Fencing
Philips Lake Fencing
Installation Purchase of fence
JAY FENCING LTD.
$15,220.00
$1,522.00
$16,742.00
7
1
Parks and Culture
Installation
posts and installation of posts
and black vinyl coated mesh
2016 Equipmnet Acquisition
Acquisition of One (1) Zero
KOOY BROTHERS
LAWN EQUIPMENT
$16,213.31
$1,621.33
$17,834.64
12
7
Restoration and
Turn Mower
LTD.
Infrastructure
Acquisition of One Compact
KOOY BROTHERS
Restoration and
2016 Equipment Acquisition
Utility Tractor
LAWN EQUIPMENT
$26,350.97
I
$2,635.10
$28,986.07
11
3
Infrastructure
LTD.
41
L Y'
4 Wynnview Court
Construction and Renovations
Koro Installations Inc.
$20,650.00
$2,065.00
$22,715.00
3
3
CEO's Office
Renovations
- flooring and plumbing.
Termseeding services with
Denison Road Major
native seed mix and cover
crop for the lop of the armour
LANDSOURCE
$15,780.00
$3,156.00
$18,936.00
5
5
Restoration and
Maintenance Project
stone wall, stock -piling area,
ORGANIX LTD.
Infrastructure
and service road.
Lower Don Lookout Project
Lower Don Lookout Project -
Landtar Construction
$85,170.00
$12,775.50
$97,945.50
12
5
Restoration and
Trail Improvements
Infrastructure
Securement of TRCAIPilley
Supply and Install 581 metres
of farm fence per OSPD
LEONE FENCE CO.
$16,696.32
$1,669.63
$18,365.95
2
2
Restoration and
Boundary
971.107
LTD
Infrastructure
Perimeter Chain Link Fence
Supply and Installation of
LEONE FENCE CO.
$19,506.00
$2,925.90
$22,431.90
3
3
Restoration and
Chain Link Fence and Gates
LTD
Infrastructure
Page wire farm fence supply
and installation on Bolton
LEONE FENCE CO.
Restoration and
Duffys Lane Fencing
Resource Management Tract
LTD
$65,900.00
$6,590.00
$72,490.00
8
1
Infrastructure
property boundary at Duffy's
Lane.
2016 Horse Drawn Wagon
Wagon Rides
Lionel's Farm
$10,925.00
$1,092.50
$12,017.50
4
1
Parks and Culture
Rides
PCC Phase II - Fencing
Petticoat Creek Aquatic
M & E GENERAL
Project
Facility Fencing and Unit
CONTRACTING
$76,265.00
$7,626.50
$83,891.50
12
6
Parks and Culture
Paving
Heart Lake Conservation Area
M & E GENERAL
Heart Lake Pool Fencing
Pool Unit Paving and Fencing
CONTRACTOR
$38,990.00
$3,899.00
$42,889.00
7
7
Parks and Culture
Project
Grading, paving and fencing
M&E General
Heart Lake Pool Fencing
between the swimming pool
Contracting
$38,990.00
$3,899.00
$42,889.00
7
7
Parks and Culture
and splash pad
Golf Cart Rentals for Bathurst
Golf Cart Rentals for Bathurst
MASTERS GOLF
$18,650.00
$1,865.00
$20,515.00
3
2
Parks and Culture
Glen Golf Course 2016
Glen Golf Course
CARTS
Supply, Delivery and
Albion Hills Conservation Area
Installation of Pre-cast
Concrete Works at Albion
Metric Contracting
$390,000.00
$39,000.00
$429,000.00
23
4
Restoration and
Dam Decomissioning
Hills Conservation Authority -
Services Corporation
Infrastructure
Dam Decomissioning
Supply and Installation of
Supply and Installation of
Poured Concrete Footing and
Poured Concrete Footing and
Pedestal Walls for New
Metric Contracting
$600,000.00
$60,000.00
$660,000.00
33
7
Restoration and
Pedestal Walls for New
Culvert at Albion Hills
Services Corporation
Infrastructure
Culvert at Albion Pond
Conservation Area Pond -
Dam Decomissioning
L Y'
1X
Mallon Channel Sediment and
Disposal of clean wood debris
Miller Waste Systems
$42,000.00
$4,200.00
$46,200.00
3
2
Restoration and
Vegetation Removal Project
Inc.
Infrastructure
Cleaning Supplies 2016
Cleaning Supplies for Black
MISTER CHEMICAL
$27,782.80
$2,778.28
$30,561.08
3
2
Parks and Culture
Creek Pioneer Village
LTD.
Eastville V&E
Purchase of a 20 foot mobile
MOBILE MINI CANADA
$11,500.00
$1,150.00
$12,650.00
4
4
Restoration and
office
ULC
Infrastructure
DVBW North Entrance Trail
DVBW North Entrance Trail
Restoration and
Improvement Project - Asphalt
Mopal Construction
$15,570.00
$1,557.00
$17,127.00
4
2
Improvement Project
Paving
Infrastructure
Toronto and Region
Conservation Authority
(TRCA) is in need of a
Etobicoke Creek North Trail -
Hydrovac Contractor to
Restoration and
expose 8 utility pipelines
multiVIEW
$16,742.00
$3,348.40
$20,090.40
6
3
Pipeline HydroVac
which currently run
Infrastructure
perpendicular to an informal
trail adjacent to the Etobicoke
Creek.
Container grown trees
Purchase of CG Trees - Fall
(deciduoud and coniferous) to
Neil Vanderkruk
$16,248.25
$2,437.24
$18,685.49
9
9
Restoration and
2016
meet Fall 2016
Holdings Inc.
Infrastructure
program/project requirements
Purchase of 2G CG Shrubs -
2G container grown shrubs to
Neil Vanderkruk
Restoration and
meet fall 2016
$30,271.00
$4,540.85
$34,811.fi5
6
1
Fall 2016
program/project requirements
Holdings Inc.
Infrastructure
Purchase of CG trees and
Container grown trees and
Neil Vanderkruk
Restoration and
shrubs
shrubs to meet Spring 2016
Holdings Inc.
$35,299.75
$3,529.98
$38,829.73
10
1
Infrastructure
requirements
Propagation Materials to
Neil Vanderkruk
Restoration and
Aquatic Plant Production
Support 2016 Aquatic Plant
$90,750.00
$0.00
$90,75D.00
5
4
Production.
Holdings Inc.
Infrastructure
Walk-in Cooler and Freezer
Walk -In Cooler and Freezer
Nella Cutlery Toronto
$22,041.80
$2,204.18
$24,245.98
3
3
Parks and Culture
for Kortright Centre Kitchen
Inc.
Lakeview Waterfront
Supply and delivery of
NELSON AGGREGATE
Restoration and
Connection Project
approximately 625 tonnes of
CO
$12,500.00
$3,000.00
$15,500.00
4
4
Infrastructure
1 9m crusher run by tri -axles
Glen Rouge Dump Station
Glen Rouge Dump Station
NOR -LINE PLUMBING
$11,085.00
$1,108.50
$12,193.50
3
3
Parks and Culture
Holding Tank Cleaning
Holding Tank Cleaning
& MECHANICAL LTD.
Albion Hills Conservation Area
Installation of Water Flow
NOR -LINE PLUMBING
Environmental Compliance
Meters; Septic Alarms and
& MECHANICAL LTD.
$61,686.00
$6,168.60
$67,854.60
5
2
Parks and Culture
Approval (ECA)
Septic Risers
BCPV Climate Control System
control
climatecontrol
sy
NOR -LINE PLUMBING
temlac at with a new
$77,410.00
$7,741.00
$85,151.00
5
4
Parks and Culture
Replacement
unit
AND MECHANICAL
1X
En
MIMICO CREEK IN TOM
The supply and placement of
Restoration and
RILEY PARK — WEIR
sod for the purpose of
Orin Contractors Corp
$13,316.00
$1,331.60
$14,647.60
3
2
Infrastructure
MAINTENANCE PROJECT
restoration at Tom Riley Park.
Pest Control and Hygiene
Pest Control and Hygiene
PCO SERVICES
$15,384.00
$1,538.40
$16,922.40
5
5
Parks and Culture
Services
Services
CORPORATION
Booking of Event Space for
Provincial Flood Forecasting
the Provincial Flood
Peter and Pauls
$35,937.50
$3,593.75
$39,531.25
4
4
Restoration and
and Warning Workshop
Forecasting and Warning
Infrastructure
Workshop
Supplemental bare root lining
Seedling Liner Stock for
out stock to meet the
PINENEEDLE FARMS
$23,294.00
$2,329.40
$25,623.40
6
6
Restoration and
Spring 2017
requirements of spring 2017
Infrastructure
nursery production
Contract services for the
installation of a traffic barrier
Scarlett Channel Guardrail
system to mitigate the hazard
Powell Construction
$30,700.00
$6,140.00
$36,840.00
4
2
Restoration and
Installation
of vehicles entering the
Infrastructure
Scarlett Flood Control
Channel.
Reclaim Historical Stone Wall
Reclaim historical stone wall
with a drylaid stone wall at the
ProBro Masonry Ltd
$23,300.00
$2,330.00
$25,630.00
4
1
Parks and Culture
At Glen Haffy
Lookout Site at Glen Haffy,
Irrigation Equipment
Supply and Deliver Irrigation
R.& W. EQUIPMENT
$18,900.95
$1,890.10
$20,791.05
3
3
Restoration and
Equipment
LIMITED
Infrastructure
Head Office
101 Exchange Avenue
Rave Audio Visual
$25,811.50
$5,162.30
$30,973.80
2
2
Restoration and
MeetingRoom Televisions
Infrastructure
Albion Hills Conservation Area
Chalet Septic System
Reg -Con Construction
$104,549.97
$20,909.99
$125,459.96
4
4
Restoration and
Replacement
Infrastructure
Bruce's Mill Old Well
Bruce's Mill Driving Range -
Roger Boadway
Decommissioning and
Old Well Decommissioning
$48,620.92
$4,862.09
$53,483.01
6
1
Parks and Culture
Installation of New Well
and Installation of New Well
Enterprises
13,500 units of 45cm x 45cm
Purchase of Coco Fibre Mulch
Cocofibre mulch mats for
S.L. NATURAL FIBRE
$9,274.50
$1,391.18
$10,665.68
2
2
Restoration and
Mats
weed control to meet spring
PRODUCTS INC.
Infrastructure
2017 project orders
14,500 units of 45cm x 45cm
Purchase of Cocofibre Mulch
cocofibre mulch mats for
S.L. NATURAL FIBRE
.
$1000500
$1,000.50
$11005.50
2
2
Restoration and
Mats
weed control to meet fall
PRODUCTS INC.
,
,
Infrastructure
2016 project orders
Jennifer Whitburn North Trib
Supply of silt sock and blower
Sandford Sand & Gravel
$9,840.00
$984.00
$10,824.00
3
3
Restoration and
Restoration
truck services on site
Inc.
Infrastructure
Supply of tri -axles to haul off
Denison Road Major
site approximately 129 loads
Sartor Environmental
$36,894.00
$7,378.80
$44,272.80
3
3
Restoration and
Maintenance Project
of table -1 fill and dispose at a
Group Inc.
Infrastructure
licensed landfill
En
45
Purchase of navigation lights
Supply & delivery of 30
navigation lights for
Sealite USA
$16,500.00
$1,650.00
$18,150.00
2
2
Restoration and
for construction
construction
Infrastructure
Restoration and construction
Renovation of basement due
work at 2273 Meadowvale
to damage from boiler system
service master
$28,055.93
$5,611.19
$33,667.12
4
3
CEO's Office
Road, Scarborough
Geotechnical investigation for
Bolton Camp Geotechnical
the Bolton Camp Phase 1 Site
Soil Engineers
$14,250.00
$1,425.00
$15,675.00
7
4
Restoration and
Investigation
Development and Building
Infrastructure
Retrofit
Equipment Purchase for
Planning Greenspace
TRCA Campgrounds
Albion Hills, Indian Line, and
Solution Stack
$14,429.85
$1,442.99
$15,872.84
3
3
and Communications
Glen Rouge campgrounds.
Supply and Delivery of
Supply and Delivery of
Restoration and
Restoration Seed Mixes for
Custom Restoration Seed
Speare Seeds
$28,236.56
$0.00
$28,236.56
9
4
Infrastructure
Various TRCA Sites
Mixes
Contract services for native
Supply and Application of
grass and forbe seed drilling
Forbat
Grass mixed Seed
the Ajax Waterfront
ST. WILLIAMS
Restoration and
Restoration Sites -Spring
est g
Meadow, Scarborough
NURSERY & ECOLOGY
$25,000.00
$2,500.00
$27,500.00
16
3
Infrastructure
2076
Heights Park, Petticoat
CENTRE
Conservation Area and
Claireville Hydro Meadow
Cleaning Supplies for TRCA
Cleaning Supplies 2016
Parks and Culture Facilities
Staples Advantage
$92,566.94
$9,256.69
$101,823.63
3
3
Parks and Culture
and Field Centres
Petticoat Creek Conservation
Hydro Service Upgrade at
Sturdy Power Lines
$104,789.57
$15,718.43
$120,508.00
3
3
Restoration and
Area
Petticoat Creek CA
Infrastructure
Humber River Between 1025
Scarlett Road and
Cruickshank Park Erosion
Rental of 6' high construction
Super Save Group
$11,492.95
$2,000.00
$13,492.95
3
1
Restoration and
Control and Slope
fence
Infrastructure
Stabilization Project
Denison Road Major
Rental of 2500 feet of 6 foot
Restoration and
Maintenance Project
high construction fence for
Super Save Group
$12,972.25
$2,300.00
$15,272.25
3
3
Infrastructure
nine months
Kortright Municipal Servicing
Phase 1 Service Road Works
Restoration and
Works
andPhase2 Bre Innovation
Taco Construction
$1,315,500.00
$197,325.00
$1,512,825.00
9
3
Infrastructure
Park
2016 Vehicle Acquistion
Acquisition of One (1) Medium
TALLMAN TRUCK
$153,089.00
$0.00
$153,089.00
10
3
Restoration and
DutyTruck
CENTRE LIMITED
Infrastructure
Supply of materials and
Bruce's Mill Driving Range
construction of a putting green
TDI
$56,896.53
$5,689.65
$62,586.18
3
3
Parks and Culture
Putting Green
at the Bruce's Mill Driving
Range
Denison Road Major
Supply and delivery of 5,500
Restoration and
Maintenance Project
tonnes of 3-5 tonne armour
THE B -TOWN GROUP
$297,825.00
$29,782.50
$327,607.50
9
6
Infrastructure
stone
45
Eno
Propane boiler for
THERWOOD HEATING
Education and
Boiler Replacement
replacement at Claremont
& COOLING
$21,000.00
.000.,050.,050.00
$1,050.00
$22
5
2
Outreach Division
Field Centre
rental cars for field terrestrial
Rental cars for terrestrial field
THOMAS SOLUTIONS
$15,400.00
$0.00
$15,400.00
3
3
Restoration and
field work
work 2016
Infrastructure
Disposal fees per tri -axle load
TMI CONTRACTING
Restoration and
45-49 Riverhead Drive
for table -1 soil
AND EQUIPMENT
$9,500.00
$950.00
$10,450.00
5
3
Infrastructure
RENTALLTD
Supply and delivery of
TMI CONTRACTING
Bluffers Park- Dredging
approximately 1,225 cubic
AND EQUIPMENT
$11,200.00
$2,000.00
$13,200.00
5
5
Restoration and
Staging Area Restoration
yards (49 tri -axle loads) of
RENTALLTD
Infrastructure
screened top soil
Black Creek Flood Control
Disposal of Stockpiled Soils
TMI CONTRACTING
Restoration and
Contaminated with Electrical
AND EQUIPMENT
$14,025.00
$1,402.50
$15,427.50
3
3
Channel Maintenance
Conductivity and SAR
RENTALLTD
Infrastructure
Bellamy Ravine Major
Disposal services for stock-
TMI CONTRACTING
Restoration and
Maintenance Project
piled contaminated soil on site
AND EQUIPMENT
RENTALLTD
$30,000.00
$3,000.00
$33,000.00
3
3
Infrastructure
Malton Channel Sediment and
Supply of tri -axles to haul off
TMI CONTRACTING
Restoration and
site table -3 fill and dispose at
AND EQUIPMENT
$53,500.00
$5,350.00
$58,850.00
5
3
Vegetation Removal Project
a licensed landfill
RENTALLTD
Infrastructure
Roof replacements at 7
Reesor Road, 17 Beare Road
Roof Replacement Rental
and 2354 Passmore Avenue,
TONY K ROOFING INC.
$58,350.00
$5,835.00
$64,185.00
6
6
CEO's Office
Homes-
Scarborough, 9330 Pine
Valley Drive, Woodbridge, 259
Pine Avenue, Caledon
Supply and Delivery of
Plastic Wristbands for use at
TORNADO
$15,010.80
$1,501.08
$16,511.88
3
3
Parks and Culture
Wristbands 2016
TRCA water play facilities
WRISTBANDS INC.
Mellon Channel Sediment and
Rental of by-pass pump
Toromont CAT Power
$26,054.00
$3,908.10
$29,962.10
5
2
Restoration and
Vegetation Removal Project
system including fuel supply
Systems
Infrastructure
Albion Hills Project
Installation of Copper and
Trinity Communication
$13,579.20
$3,394.80
$16,974.00
3
3
Planning Greenspace
Fibre
Services Ltd.
and Communications
Claremont Pioneer Cabin
Claremont Pioneer Cabin
Ultimate Construction
$74,100.00
$7,410.00
$81,510.00
4
4
Restoration and
Project- Structural Repairs
Structural Repairs
Inc.
Infrastructure
Case 521 E Loader for various
2.0-2.4 cubic yard wheel
UNITED RENTALS OF
$11,850.00
$2,370.00
$14,220.00
4
2
Restoration and
projects
loader
CANADA, INC.
Infrastructure
Reddington Survey
Survey / Reference Plan
Van Herten Surveying
$14,500.00
$1,450.00
$15,950.00
6
2
CEO's Office
Inc.
Installation of New Carpet
Restoration and
Boyd Retrofit Project
Floor and Base at Boyd
Verna Corp.
$29,937.00
$2,993.70
$32,930.70
4
4
Centre
Infrastructure
Eno
47
container grown trees and
Purchase of CG trees and
shrubs in a vareityof species
VERBINNEN'S
$14,700.19
$1,470.02
$16,170.21
10
1
Restoration and
shrubs
and sizes to meet Spring 2016
NURSERY
Infrastructure
project requirements
BCPV Power Outage
Power Restoration to Black
YORK POWER AND
$15,000.00
$3,000.00
$18,000.00
6
2
Parks and Culture
Creek Pioneer Village
LIGHTING INC.
Total Cost
Criteria to
Responded
Type
Project Name
Being Purchased
Awarded Bidder
Contract Cost
Contingency
(Before
Preferred
(Not
TRCA Division
Cost
Revisions)
or Sole
Applicable)
(Responsible)
Source
Preferred Source
Generator rental to power
Generator rental for BCPV
BCPV during the repairs from
AINSWORTH INC.
$19,417.00
$3,883.40
$23,300.40
2
N/A
Parks and Culture
Power Outage (Sept 23)
the September 23rd power
outage.
BCPV Power Restoration -
Restoration of Power to BCPV
AINSWORTH INC.
$43,271.70
$0.00
$43,271.70
2
N/A
Parks and Culture
June 2016
-June 2016
Black Creek Flood
Black Creek Environmenal
Remediation Integration Study
AMEC ENVIRONMENT
Restoration and
Assessment Integration Study
- based on Riverine Flooding
& INFRASTRUCTURE
$17.47725
$1,747.73
$19,224.98
1a
N/A
Infrastructure
EA and Toronto Water
Basement Flooding Study
Black Creek Pioneer Village
Electrical Engineering
Services for Black Creek
Ameresco Consulting
$45,266.50
$2,263.33
$47,529.83
3
N/A
Restoration and
Project
Pioneer Village
Infrastructure
CCN inspections to
document pre -construction
Archdekin Park CCN
and post construction
Andrews Infrastructure
$12,000.00
$1,200.00
$13,200.00
3
N/A
Restoration and
Inspection
conditions of a 1200 mm
Infrastructure
diameter sanitary main within
Joyce Archdekin Park.
Heart Lake Rd EcoPassage
Directional Fencing
Animex Fencing
$14,916.00
$0.00
$14,916.00
3
N/A
Watershed Strategies
Project
Fuel Supply for Bruce's Mill
Unleaded fuel, dyed bio -diesel
Armstrong Petroleum
$34,514.50
$3,451.45
$37,965.95
4
N/A
Parks and Culture
and Bathurst Glen
fuel, furnace oil, propane
Purchase of Voice Over
Internet Protocol(VOIP)
Planning Greenspace
Swan Lake VOIP Installation
equipment, programming,
BELL CANADA
$17,911.44
$3,582.29
$21,493.73
la
N/A
and Communications
licensing, and maintenance for
the Swan Lake building.
Purchase and installation of
Restoration and
Lower Drive for Aqualab
new drive unit for Aqualab
BRISTOL MARINE LTD.
$13,909.13
$0.00
$13,909.13
la
N/A
Infrastructure
V5000
Planning & Development
Planning & Development
CDW CANADA
$1118971
$111897
$1230868
i
N/A
Planning Greenspace
Department Upgrades
Department Upgrades
,.,.,.s
and Communications
47
F
Certified Inspector of
Hiring an instructor for the
Christine Doody
Sediment and Erosion Control
Canadian Certified Inspector
Hamilton, Seneca
$24,999.99
$0.00
$24,999.99
3
N/A
Education and
Instructor Contract
of Sediment and Erosion
College
Outreach Division
Control training modules
Purchase and License of
Clean Harbors
Planning Greenspace
TRCA Jurisdiction LiDAR
LOAR data for the
Exploration Services
$140,310.40
$0.00
$140,310.40
3
NIA
and Communications
entireTRCAjurisdicbon
Real Estate Appraisal for
Appraisal for acquisition of an
D. Bottero & Associates
acquisition of an easement by
easement by TransCanada
Limited
$15,200.00
$1,520.00
$16,720.00
3
N/A
CEO's Office
TransCanada Pipeline Limited
Pipeline Limited
Engineering services for the
development of 2 Dimensional
2 -Dimensional Modeling
(2D) Modeling Guidelines for
DHI WATER &
Restoration and
Guideline Document
use in the review and
ENVIROMENT, INC.
$9.850.00
$500.00
$10,350.00
3
N/A
Infrastructure
development of 2D modeling
studies within TRCA's
jurisdiction
GTAA - Electrical
GTAA Admin Building
Infrastructure for EV Charging
(Convair Drive) and Cell Lot
Enersource Power
$445,811.45
$44,581.15
$490,392.60
3
N/A
Watershed Strategies
Stations
(Viscount Road): 27.6KV
Services
supply and install
Employer Engagement Project
Consultation and evaluation
services for an Employer
e -NOVA Consulting
$15,092.00
$1,509.20
$16,601.20
3
NIA
Education and
Evaluation
Engagement Project
Outreach Division
Exterior Siding Restoration
Exterior Siding Restoration
G.V. Miller Custom
Dingle School House
Dingle School House,
Contracting
$12,525.00
$2,505.00
$15,030.00
3
NIA
CEO's Office
Caledon
Award of Contract #10002159
for geotechnical engineering
services on a preferred source
Yellow Creek near Heath
basis to complete a slope
Street East — Stairway
stability and erosion risk
GeoTerre Ltd.
$83,410.00
$8,341.00
$91,751.00
3
N/A
Restoration and
Replacement and Slope
assessment behind 10
Infrastructure
Stabilization Project
residential properties along
Yellow Creek near Heath
Street East, in the City of
Toronto
Bruce's Mill Driving Range
Safety Netting for Bruce's Mill
Golf Pro Netting
$13,750.00
$1,375.00
$15,125.00
1a
N/A
Parks and Culture
Netting
Driving Range
F
m
J
GTAA overseeing
procurement of all subsidiary
goods and services (aside
EV Charging Station Project
from EV charging stations and
Greater Toronto Airports
$1,250,000.00
$125,000.00
$1,375,000.00
3
N/A
Watershed Strategies
high-voltage electrical work) to
Authority
deliver 32 electric vehicle
charging stations at four
locations on airport lands.
Landscaping Services for
Landscaping Services for
Education and
Kortright Centre
Kortright Centre for the 2016
GreenLEF
$24,000.00
$2,400.00
$26,400.00
3
N/A
Outreach Division
Operating Season
Real estate appraisal and
Real Estateraisal
APp and
consultancy services for
acquisition of an easment by
9si Real Estate $
$28000.00
$0.00
$24,000.00
3
N/A
CEO's Office
Consultancy Services
TransCanada PipeLines
Planning Advisors Inc.
Limited
Bruce's Mill Rain Gauge
Purchase of precipitation
HOSKIN SCIENTIFIC
$13,052.00
$1,305.20
$14,357.20
3
N/A
Restoration and
Upgrade
gauge and data logger
LTD.
Infrastructure
Education consulting services
to Mase with school boards
Great Lakes St. Lawerence
across the province in
KAREN BOND
$10,000.00
$0.00
$10,000.00
3
N/A
Education and
River Student Summit
preparation for the Great
Outreach Division
Lakes St Lawrence River
Student Summit
Indian Line Campground
Transformer Replacement
Kayski Engineering
$14,100.00
$1,410.00
$15,510.00
3
N/A
Restoration and
Project
Infrastructure
Supply and delivery of
approximately 1,200 meters of
Post and Paddle Fencing-
Post and Paddle Fencing
Lanark Cedar
$23,301.00
$0.00
$23,301.00
la
N/A
Restoration and
Inventory
used for Various City of
Infrastructure
Toronto and York Region
projects.
Eco Schools Student Summit,
Rental of Living Arts Centre,
Living Arts Centre,
Mississauga for Ontario
Living Arts Centre,
$10,288.54
$1,028.85
$11,317.39
3
N/A
Education and
Mississauga
EcoSchools Student
Mississauga
Outreach Division
Ecosummit
Supply materials and
M 8 E General
Heart Lake Interlocking
construction of interlocked
Contracting
$16,159.00
$1,615.90
$17,774.90
2
N/A
Parks and Culture
area at Heart Lake pool
Trout Feed for Glen Haffy
Supply and Delivery Trout
Conservation Area Fishery
Feed to Glen Haff
MARTIN MILLS INC.
$29,160.55
$2,916.06
$32,076.61
4
N/A
Parks and Culture
Conservation Area 2016-2017
Carruthers Creek Watershed
Geomorphic Consulting
Matrix Solutions (Parish
$24.975.50
$0.00
$24,975.50
3
NIA
Watershed Strategies
Plan Geomorphic Consultant
Services for Carruthers Creek
Geomorphic)
m
J
Patterson Creek Sanitary
Consulting services for
Infrastructure Project - 1-066
Construction Support at
Patterson Creek Sanitary
MATRIX SOLUTIONS
$12,594.20
$1,889.13
$14,483.33
3
N/A
Restoration and
Construction Support and
Infrastructure Protection
INC.
Infrastructure
CVR
Project Site 1-066
4816 Major Mackenzie Drive,
Mold remediation in bathroom
MERIDIAN
$15,770.00
$2,365.50
$18,135.50
3
N/A
CEO's Office
Mold Remediation
CONSTRUCTION INC.
Website maintenance and
Server Maintenance,
Application Support and
MOJILITY INC.
$22,500.00
$0.00
$22,500.00
3
N/A
Planning Greenspace
support
Development Services
and Communications
Petticoat Creek Pool Pumps
Repair and service of
NOR -LINE PLUMBING
$10,813.00
$540.65
$11,353.65
3
N/A
Parks and Culture
Petticoat Creek pool pumps
& MECHANICAL LTD.
Qualifying target audience,
The Living City Report Card
key messages and creation
OCAD University
$23,425.00
$4,685.00
$28,110.00
5
N/A
Watershed Strategies
OCAD
visuals for the updated living
city report card.
Operation of the BCPV
Black Creek Historic Brewery
brewery and brewing of Black
Pioneer Brewery Ltd
$247,200.00
$5,000.00
$252,200.00
3
N/A
Parks and Culture
Creek Historic Ales
60th Annual Meeting Video
20 minute video celebrating
POWERLINE FILMS
$12,808.55
$0.00
$12,808.55
3
N/A
Planning Greenspace
TRCA's 60th Annual Meeting
and Communications
Bruce's Mill Driving Range
Design, supply and installation
Irrigation Pump and Controller
of Bruce's Mill Driving Range
PUMPTRONICS
$10,995.00
$2,199.00
$13,194.00
3
N/A
Parks and Culture
Station
Irrigation Pump and Controller
INCORP.
Station
2016 YDREL
RWMP/Mayfield/CCWP/RNU
Water chemistry laboratory
REGION OF DURHAM
$46,472.00
$0.00
$46,472.00
la
N/A
Restoration and
P/Albion WO
analysis
Infrastructure
Laserfiche Virtualization
Virtualization process and
RICOH
$12,847.54
$1,284.75
$14,132.29
la
NIA
Planning Greenspace
Project
temporary licensing
and Communications
SAVE Program project
Project management and
Education and
management and
implementation support to
Robert Roszell
$24,000.00
$0.00
$24,000.00
3
N/A
Outreach Division
implementation support
implement the SAVE program
Professional Lansdcape
Architectural Consulting
Cudmore Creek Detailed
Services in support of the
Design and Constrcution
preparation of design
SCHOLLEN &
$43,458.00
$4,345.80
$47,803.80
3
N/A
Restoration and
Drawings
drawings, details and costing
COMPANY INC.
Infrastructure
for the Cudmore Creek
Trailhead project in the City of
Toronto
51
Professional Lansdcape
Architectural Consulting
Services in support of the
Cottonwood Flats Phase 2
preparation of design
SCHOLLEN &
$46,476.00
$2,323.80
$48,799.80
3
NIA
Restoration and
Implementation
drawings, details and costing
COMPANY INC.
Infrastructure
for the Cottonwood Flats
Phase 2 project in the City of
Toronto
Coastal engineering services
Scarborough Waterfront
in support of the Scarborough
Shoreplan Engineering
$49,800.00
$0.00
$49,800.00
3
N/A
Watershed Strategies
Project Coastal Engineering
Waterfront Project
Ltd.
Environmental Assessment.
Website Support and
Web Application Support and
Planning Greenspace
Development
Development of TRCA's main
Simalam Media Inc.
$40,000.00
$0.00
$40,000.00
la
N/A
and Communications
website platform
Consulting services for a GIO
GIO Workshop Facilitator and
workshop -facilitation, pre-
Solstice Sustainability
$9,500.00
$1,900.00
$11,400.00
3
N/A
Watershed Strategies
Report Writer
workshop interviews, and post
Works Inc
workshop report.
191 - 195 Hudson Drive
191-195 Hudson Drive: Long
Term Stable Slope Crest
TERRAPROBE INC.
$11,855.00
$2,371.00
$14,226.00
3
N/A
Restoration and
LTSSC Update
(LTSSC) Position Update
Infrastructure
14 Azalea Court Slope
Slope stability assessment
Restoration and
Stability Assessment and
and conceptual alternatives
TERRAPROBE INC.
$19,430.00
$2,914.50
$22,344.50
3
N/A
Infrastructure
Conceptual Alternatives
development
111-117 Jennifer Whitbum
Full-time engineering during
Crescent - Design -Build
the construction of slope
Restoration and
Contracts RSD14-214 and
stabilization works behind 117
TERRAPROBE INC.
$19,850.00
$3,970.00
$23,820.00
3
N/A
Infrastructure
RSD14-215: Engineering
Whitburn Crescent, in the City
Support
of Toronto.
Geotechnical engineering
Scarborough Waterfront
services in support of the
Project Geotechnical
Scarborough Waterfront
TERRAPROBE INC.
$46,411.00
$2,320.55
$48,731.55
3
NIA
Watershed Strategies
Engineering
Project Environmental
Assessment.
Thorpe Associates Contract to
Contract to provide expert
Provide Advisory Services
advice to the CTC Source
related to Source Water
Protection Region through the
Thorpe and Associates
:$50,000001
$5,000.00
$55,000.00
is
NIA
Watershed Strategies
Protection
first year of source protection
plan implementation.
BCPV Generators
Four generator rentals to
Toromont CAT Power
$52,924.50
$5,292.45
$58,216.95
3
N/A
Parks and Culture
maintain power at BCPV
Systems
Agresso Business World
Support for upgrade of
UNIT4 BUSINESS
$25,040.00
$2,504.00
$27,544.00
1a
N/A
CEO's Office
Upgrade
financial information software
SOFTWARE CORP
51
52
Engineering services for the
development of a 2
Dimensional (21)) hydraulic
Floodplain Mapping and 2D
model and engineered
Model Simulations for the
floodline mapping for the
VALDOR
$22,466.66
$3,370.00
$25,836.66
3
N/A
Restoration and
Yonge and Elgin Mills Area of
Yonge and Elgin Mills Area
ENGINEERING INC.
Infrastructure
Richmond Hill
within the Don River
watershed, through the Town
of Richmond Hill, York
Region.
Design services for parking lot
Claremont Field Centre
expansion and design
Education and
Classroom and Parking Lot
services plus construction
Ward 99 Architects
$24,500.00
$2,450.00
$26,950.00
3
N/A
Outreach Division
Renovations
management for classroom
renovation.
Retaining legal advice in
Acquisition of an Easement by
regards to acquistion of an
WeirFoulds LLP
$20,000.00
$2,000.00
$22,000.00
3
N/A
CEO's Office
TransCanada Pipeline Limited
easement by TransCanada
Pipeline Limited
Willms & Shier
Brock Landfill
Legal expertise on Landfill
Environmental Lawyers
$25,000.00
$0.00
$25,000.00
3
N/A
CEO's Office
LLP
Detailed Design and
Consulting Service for E/One
Restoration and
Specifications for E1 Pumping
System for Kortright Municipal
WSP Group
$48,500.00
$0.00
$48,500.00
3
N/A
Infrastructure
System
Servicing Project
BCPV Emergency Power
Restoration of Power to BCPV
YORK POWER AND
$29,040.00
$0.00
$29,040.00
2
N/A
Parks and Culture
Repair March 2016
LIGHTING INC.
Engineering services for smart
LDC 2 Engineering Support
grid peer to peer
Shivam Kumar Saxena
$44,100.00
$0.00
$44,100.00
3
N/A
Education and
communications in an Active
Outreach Division
Distribution Network
Sole Source
CDMA Modem Replacement
3G Data modems and
ALCOM ENTERPRISES
$10,824.97
$541.25
$11,366.22
3
NIA
Restoration and
Antennas
INC.
Infrastructure
Acoustic Telemetry Equipment
Purchase of Acoustic
AMIRIX SYSTEMS INC.
$17,631.09
$0.00
$17,631.09
3
N/A
Restoration and
for Fish Monitoring
Telemetry Fish Transmitters
Infrastructure
Business Partnership to
Enerlife Partnership
deliver Energy Efficiency
Enerlife Consulting
$350,000.00
$0.00
$350,000.00
3
N/A
Watershed Strategies
Programs
Renewal of subscription for on
ENVIRONICS
Environics 3 yr. renewal
line access to demographic
ANALYTICS GROUP
$90,000.00
$0.00
$90,000.00
1
N/A
Planning Greenspace
and customer profiles data for
LTD.
and Communications
a 3 year term.
Sponsorship of Green Living
GREEN LIVING
Green Living Partnership
Enterprieses Green Business
ENTERPRISES
$10,000.00
$0.00
$10,000.00
3
N/A
Watershed Strategies
Forum 2016
Grey to Green Conference
Sponsorship of Grey to Green
GREEN ROOFS FOR
$10,000.00
$0.00
$10,000.00
3
N/A
CEO's Office
Sponsorship
Conference 2016
HEALTHY CITIES
52
TOTALS1 $25,092,027.40 $2,297,157.911 $27,389,185.31
53
Dixie -Dundas Real Time
Two Sutron 9210 Data
Stream Gauge and Rain
Loggers and One Olt Pluvio2
HOSKIN SCIENTIFIC
$16,219.15
$1,621.92
$17,841.07
3
N/A
Restoration and
Gauge Procurement
Rain Gauge with Wind
LTD.
Infrastructure
Screen, Mounting Pole
Precipitation Gauge
Sutron Data Loggers and Ott
HOSKIN SCIENTIFIC
$23,102.00
$1,155.10
$24,257.10
3
N/A
Restoration and
Equipment Upgrades
Pluvio2 Precipitation Gauges
LTD.
Infrastructure
Monthy Fees for BCPV
Monthly maintenance and
Parking Lot
services required to operate
Precise Park Link
$24,878.00
$0.00
$24,878.00
3
N/A
Parks and Culture
the parking lot pay toll system
Contingency
Total Cost
Total
TRCA Divissr
Type
Project Name
Being Purchased
Awarded Bidder
Contract Cost
Cost
(Before
Vendors
Responded
(Responsible)
Revisions
Vendor of Record
Wanes GEO
Components
Vendor of Record for Supply
Erosion and Sediment Control
•Terrafix Geosynthetics
Restoration and
and Delivery of Various Types
Inc.
$75,000.00
$0.00
$75,000.00
4
4
of ESC Materials
Materials
-Sandford Sand and
Infrastructure
Gravel Inc.
•Nilex Inc.
Vendors of Record for
•JML Electric Inc.
electrical and mechanical
T.A. Graham Electrical
Vendor Record M&E
related goods and services
•Rand Electric
Restoration and
Contractors
to
for operating
under $May
.DNA Mechanical
$300,000.00
$0.00
$300,000.00
7
6
Infrastructure
season May 1, 2016 to May i,
1,
•LITEK Mechanical
2017.
•Nor -Line plumbing &
Mechanical Ltd.
-Glenn Windrem
Trucking
Vendors of Record for supply
Supply and delivery of various
•Dufferin Aggregates
Restoration and
of various aggregates across
aggregates from July 1, 2016
-TBG Environmental Inc.
$1,200,000.00
$0.00
$1,200,000.00
10
5
Infrastructure
the GTA
to July 1, 2017
•B Town Group
-Blythe Dale Sand &
Gravel
TOTALS1 $25,092,027.40 $2,297,157.911 $27,389,185.31
53
Attachment 2
Type Project Name Being Purchased Awarded Bidder Revision Cost
Highest Ranked
Alfred Kuehne Blvd. Stream
Realignment and Restoration Project
Engineering Services
Beacon Environmental
$9,000.00
- Phase 3
Hydraulic analysis and detailed
Bran Road Outfall Repair and Bank
designs for an outfall repair and
GHD INC.
$2,500.00
Stabilization
bank stabilization at Bren Road Site
1 and Site 2.
Hydraulic analysis and detailed
Bran Road Outfall Repair and Bank
designs for an outfall repair and
GHD INC.
$5,780.00
Stabilization
bank stabilization at Bren Road Site
1 and Site 2.
Melton Greenway Sanitary
Consulting services for hydraulic
Protection Project - Hydraulic
analysis and detailed design at
GHD INC.
$6,730.00
Anaylsis and Detailed Designs
Melton Greenway Sanitary
Infrastructure Protection Project
Brookbanks Park Erosion Control
Brookbanks Park South of
Project - Hydraulic Analysis and
Brookbanks Drive, City of Toronto -
GRECK & ASSOCIATES
$1,800.00
Conceptual Designs
Hydraulic Analysis and Conceptual
LTD.
Design Alternatives
Brookbanks Park Erosion Control
Brookbanks Park South of
Project - Hydraulic Analysis and
Brookbanks Drive, City of Toronto -
GRECK & ASSOCIATES
$4,000.00
Conceptual Designs
Hydraulic Analysis and Conceptual
LTD.
Design Alternatives
Engineering services - Albion Pond
Engineering Consulting Services for
GRECK & ASSOCIATES
$13,018.00
decommissioning
Albion Pond Decommissioning
LTD.
Brookbanks Park Erosion Control
Brookbanks Park South of
Project - Hydraulic Analysis and
Brookbanks Drive, City of Toronto -
GRECK & ASSOCIATES
$36,750.00
Conceptual Designs
Hydraulic Analysis and Conceptual
LTD.
Design Alternatives
Design -Build -Maintain: Ten Level 3
GTAA - Design -Build -Maintain EVSE
and Twenty-two Level 2 Electric
Precise Park -ink Inc.
$17,831.00
(EVCO Program)
Vehicle Charging Stations at Toronto
Pearson International Airport
Denison Road Major Maintenance
Detailed design services for toe
Project
protection structure for Denison
TERRAPROBE INC.
$750.00
Road Major Maintenance Project
81 - 83 Fishleigh Drive Detailed
Slope stabilization detailed design
Terraprobe Inc.
$5,057.00
Designs
Denison Road Major Maintenance
Detailed design services for toe
Project
protection structure for Denison
TERRAPROBE INC.
$5,600.00
Road Major Maintenance Project
81 - 83 Fishleigh Drive Detailed
Slope stabilization detailed design
Terraprobe Inc.
$8,000.00
Designs
81 - 83 Fishleigh Drive Detailed
Slope stabilization detailed design
Terraprobe Inc.
$10,500.00
Designs
Professional engineering services in
support of the development of a 1 D-
JaneANilson Hydraulic Modelling
2D hydraulic model and engineered
VALDOR ENGINEERING
$4,900.00
Update
floodline mapping for the Black
INC.
Creek tributary from Gravenhurst
Ave. to 100m Lawrence Ave.
54
55
Professional engineering services in
support of the development of a 1 D-
Jane/Wilson Hydraulic Modelling
2D hydraulic model and engineered
VALDOR ENGINEERING
$8,820.00
Update
floodline mapping for the Black
INC.
Creek tributary from Gravenhurst
Ave. to 100m Lawrence Ave.
Scarborough Waterfront Project -
Traffic Impact Assessment
WSP CANADA INC.
$13,322.00
Traffic Impact Study
Consulting Services
Lowest Bid
1 Katrina Road to 53 Riverhead
Opinion of Probable Cause &
Drive Emergency Slope Stabilization
Estimates for Repair for Property
AECOM Canada Limited
$7,850.00
Works
Damage Observed Following
Construction Activities
Scarborough Waterfront Project -
Third Party Environmental
Anneliese Grieve Strategic
Third Party EA Reviewer
Assessment Reviewer in support of
Environmental Planning
$81,650.00
the Scarborough Waterfront Project
Solutions
Denison Road Slope Stabilization
Rental of a Skid Steer with Forks
BATTLEFIELD EQUIPMENT
$9,800.00
and Erosion Control Project
and Sweeper Attachment
RENTALS INC.
Supply of Office Supplies for TRCA
Corporate Express
Office Supply Purchases
Purposes
Canada/Staples Advantage
$28,750.00
Canada
Malton Greenway Sanitary
Rental of 8'x 12' steel road plates
Cos Shore Inc.
$4,678.00
Infrastructure Protection Project
Snow Removal Services for 2016-
Snow Removal for Various TRCAResidential
Crystal Lawn &Snow
2017
Rental Properties and
Removal Inc.
-$4,620.00
TRCA Old Head Office and BCPV
Trail base construction services
including excavation, placing of
ESPOSITO BROS
West Hill Trail Realignment Project
culvert pipes, placing stone base,
CONSTRUCTION LTD.
$11,969.00
and grading for West Hill Trail
Realignment Project
Fire Services Provider for Parks and
Fire Protection Services
Focus Fire Protection
$2,740.00
Culture Facilities
Temporary Bridge for Lakeview
Fabrication, Delivery and Unloading
Project
of a Portable Highway Grade
GANAWA COMPANY LTD.
$11,370.00
Temporary Steel Bridge
LC-16 Manhole rehab design and
Bercy Wycliffe Park P-531 Manhole
tender specifications at Bercy
Greck and Associates Ltd.
$1,113.00
Protection - Manhole Rehab Design
Wycliffe Park P-531 Sanitary
Protection Project.
STOUFFVILLE DAM -
Stouffville Dam needs repairs
ENGINEERING SERVICES FOR
designed to address deficiencies
Hydrosys Consulting Inc.
$6,103.00
DAM SAFETY UPGRADES
found during the 2014 dam safety
review.
Pre-construction and post-
1025 Scarlett Road - 2016 CCTV
construction CCN scan of storm
Infrastructure Intelligence
$6,580.00
Inspection
and sanitary infrastructure at
Services Inc.
Cruickshank Park, City of Toronto
Petticoat Creek Pleasant Point
Petticoat Creek Pleasant Point
NOR-LINE PLUMBING &
Sewage Upgrades
Washroom - Sewage System
MECHANICAL LTD.
$1,352.00
Upgrades
Albion Hills Conservation Area
Installation of Water Flow Meters;
NOR-LINE PLUMBING &
Environmental Compliance Approval
Septic Alarms and Septic Risers
MECHANICAL LTD.
$2,729.00
(ECA)
Petticoat Creek Pleasant Point
Petticoat Creek Pleasant Point
NOR-LINE PLUMBING &
Sewage Upgrades
Washroom - Sewage System
MECHANICAL LTD.
$4,680.00
Upgrades
Supply and Delivery of Firewood and
Firewood and Kindling Bags for Re-
Ontario Firewood
$46,538.00
Kindling Bags for Re-sale
sale
55
TOTAL 1 $490,293.00
56
Supplemental bare root lining out
Seedling Liner Stock for Spring 2017
stock to meet the requirements of
PINENEEDLE FARMS
$3,522.00
spring 2017 nursery production
Albion Hills Conservation Area
Chalet Septic System Replacement
Reg -Con Construction
$4,000.00
Denison Road Major Maintenance
Supply of to -axles to haul off site
approximately 129 loads of table -1
Sartor Environmental Group
$68,640.00
Project
fill and dispose at a licensed landfill
Inc.
45- 49 Riverhead Drive
Disposal of Woody Debris using 40
Superior Disposal a Division
$3,800.00
cubic Yard Bins
of
Kortright Municipal Servicing Works
Phase 1 Service Road Works and
Tacc Construction
$6,048.00
Phase 2 Bre Innovation Park
Malton Channel Sediment and
Rental of by-pass pump system
Toromont CAT Power
$1,650.00
Vegetation Removal Project
including fuel supply
Systems
Malton Channel Sediment and
Rental of by-pass pump system
Toromont CAT Power
$12,727.00
Vegetation Removal Project
including fuel supply
Systems
Toronto and Region Conservation
Authority (TRCA) will be paving an
informal trail to provide a trail
Etobicoke Creek North Trail -
connection along Etobicoke Creek at
URBAN FOREST
$450.00
Arborist Report
Eglinton as part of the Bikeway
ASSOCIATES INC.
Trails Implementation Plan, adopted
by Council 2012. As a result, TRCA
is in need of
Preferred Source
Qualifying target audience, key
The Living City Report Card OCAD
messages and creation visuals for
OCAD University
$8,000.00
the updated living city report card.
Ontario Climate Consortium's
Venue for hosting Ontario Climate
Annual Symposium - University of
Consortium Symposium
University of Guelph
$3,816.00
Guelph (Guelph, Ontario)
TOTAL 1 $490,293.00
56
Attachment 3
SCHEDULE 'B'
GOODS AND SERVICES EXEMPT FROM THE REQUIREMENTS OF SCHEDULE 'A'
The following purchases and payments are not subject to the approval and reporting
requirements of Schedule'A', unless otherwise directed by the CEO or designate or as provided
in other TRCA policies. The CEO or designate shall establish procedures and approval
thresholds applicable to Schedule'B' items.
Utilities
Electricity
Water and sewage charges
Natural gas, fuel oil, propane
Basic telephone/data/internet/service
Basic television cable service
Training and Education
Membership and association fees, as permitted by TRCA policy
Magazine and periodical subscriptions
Staff development (except where bulk training is arranged through a bidding process)
Conferences and seminars
Tuition reimbursement in accordance with TRCA personnel policies
3. Refundable Employee Expenses
Meal allowances
Travel and transportation expenses
Accommodations
Mileage
Other employee expenses incurred on TRCA business
4. General Expenses
Property taxes
Postage
Licenses e.g. vehicles, software, municipal, etc.
Land purchases, including expropriation costs and land registry fees
Customer refunds
Insurance deductibles
Legal settlements
Grievance payments
5. Petty Cash Replenishment
6. Payments to Current and Past Employees
Salaries, wages and benefits due to any person in the employ of TRCA
Retirement allowances, settlements and other payments due to a person previously in
the employ of TRCA
57
Government Payments
Fees, levies and taxes payable to federal, provincial or municipal governments, or to any
agency, board or commission thereof
Debt
All accounts for payments of principal or interest on debentures, loans or overdrafts,
including foreign exchange
Pension Deductions, Contributions and Employee Benefit Plan Payments
Employee pension deductions and employer pension contributions
Payments to the providers of employee benefit plans.
10. Grants and Contributions
Research grants for special projects undertaken by qualified college or university staff
and/or students acting on behalf of their respective institution
Payments made to landowners and similar groups under a granting program as
approved by the Authority.
Grants to community groups and public service bodies to assist with research or
knowledge gathering which is of particular interest to TRCA
11. Goods and Services Purchased for Resale
12. Paid advertising
Fu
Attachment 4
SCHEDULE `A'
PURCHASING METHODS, LIMITS AND AUTHORIZATION
Method of Procurement
Total Value of Procurement
Before Applicable Taxes
Authorization to Award
Low Dollar Value
Less than $2,500
Authorized Buyer
RFQ/Tender (Low Bid),
RFP (Highest Ranked), or
Sole Source
$2,500 to less than $100,000
CEO or designate
$100,000 to less than $200,000
Executive Committee
$200,000 or higher
Authority
Preferred Source
$2,500 to less than $50,000
CEO or designate
$50,000 to less than $200,000
Executive Committee
$200,000 or higher
Authority
Award to Other than the Low Bid or
Highest Ranked
$2,500 to less than $25,000
CEO or designate
$25,000 to less than $200,000
Executive Committee
$200,000 or higher
Authority
59
Attachment 5
TORONTO AND REGION CONSERVATION AUTHORITY
PURCHASING POLICY
9.2 Sole Source - A sole source purchase occurs only when there is one supplier of a
particular good or service that meets the requirements of TRCA by reason of:
1. a statutory or market-based monopoly;
2. scarcity of supply in the market;
3. the goods or services are unique to one supplier and no practical alternatives or
substitutes exist.
9.3 Preferred Source - A preferred source purchase shall only be used if one or more of the
following conditions applies and a process of negotiation has been undertaken to obtain
the best value in the circumstances for TRCA:
1. The goods and services are only available from one source or one supplier by reason
of:
a. need for compatibility with goods and services previously acquired and there are
no reasonable alternatives, substitutes or accommodations;
b. desire to avoid violating warranties and guarantees where service is required.
2. The goods and services are required as a result of an emergency, which would not
reasonably permit the use of the regular procurement methods.
3. The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably
provided by any other supplier.
4. The required goods and services meet TRCA's sustainability criteria and guidelines
defined in the Policy and could not be reasonable met through regular procurement
methods.
5. Special research and development projects with academic institutions, government
bodies, industry organizations and similar bodies.
•l
SECTION IV—ONTARIO REGULATION 166/06, AS AMENDED
RES1610/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Michael Di Blase
Seconded by: Jennifer McKelvie
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 - 10.5 and 10.7 — 10.8, which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.5 AND 107 — 10.8 ARE MAJOR APPLICATIONS -
REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency with policies;
applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive
modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of
violations/after the fact permits, trail construction.
CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]
10.1 11 NEWLIN CRESCENT
To construct, reconstruct, erect or place a building or structure and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on
(11 Newlin Crescent), in the City of Toronto (North York Community Council Area),
Humber River Watershed. The purpose is to acknowledge the construction of a shed to
the rear of the existing single family detached dwelling at 11 Newlin Crescent in the City
of Toronto (North York Community Council Area). The shed was constructed without
TRCA or Municipal permits. As such, the applicant has paid double the application fee
as required for a permit "after -the -fact' in association with the violation of Ontario
Regulation 166/06.
CFN: 56890 - Application #: 1199/16/TOR
Report Prepared by: Anna Lim 5284 alim@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: January 31, 2017
61
CITY OF VAUGHAN
10.2 12 BRODA DRIVE
To construct, reconstruct, erect or place a building or structure and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on
Lot 10, Lot 11, Private Lane Plan 4005, (12 Broda Drive), in the City of Vaughan,
Humber River Watershed. The purpose is to facilitate development in a regulated area of
the Humber River Watershed to lift the front of a garage, add a front porch roof, extend
the rear balcony at the same depth and maintain a rebuilt rear addition constructed
without TRCA approvals. The applicant has paid double the application fee as required
for voluntary compliance related to resolution of a violation of Ontario Regulation 166/06.
The subject property is located on lands known municipally as 12 Broda Drive, in the
City of Vaughan.
CFN: 57024 - Application M 1256/16NAUG
Report Prepared by: Anthony Syhlonyk 5272 asyhlonyk@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: February 1, 2017
CITY OF VAUGHAN
10.3 286 CHARLTON AVENUE
To construct, reconstruct, erect or place a building or structure on Lot 165, Plan 65M-
2299, (286 Charlton Avenue), in the City of Vaughan, Don River Watershed. The
purpose is to undertake works within TRCA's Regulated Area of the Don River
Watershed in order to facilitate the construction of a 24 sq. m. (254 sq. ft.) all season
room addition and 32 sq. m. (341 sq. ft.) deck at the rear of an existing single detached
dwelling, associated with a municipal building permit. The subject property is located on
lands known municipally as 286 Charlton Avenue, in the City of Vaughan.
CFN: 55865 - Application M 0476/16/VAUG
Report Prepared by: Stephen Bohan 5743 sbohan@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: February 15, 2017
TOWN OF AJAX
10.4 85 ROLLO DRIVE
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Lot 11, Plan 40M-1505, (85 Rollo Drive), in the Town of Ajax,
Carruthers Creek Watershed. The purpose is to acknowledge the construction of a
replacement deck and new hot tub structure to the rear of the existing single family
detached dwelling at 85 Rollo Drive in the Town of Ajax. The works were partially
constructed without the benefit of TRCA and/or municipal permit approval.
62
CFN: 57116 - Application #: 0002/17/AJAX
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: February 21, 2017
TOWN OF RICHMOND HILL
10.5 33 MISTLEFLOWER COURT
To construct, reconstruct, erect or place a building or structure on Part 37 Plan 65M-
3214, (33 Mistleflower Court), in the Town of Richmond Hill, Humber River Watershed.
The purpose is to recognize the construction of a 3.6 m (12 ft) by 2.6 m (8.6 ft) wood
deck and 2.9 m (9.6 ft) wide by 1.4 m (4.7 ft) long by 1.2 m (4 ft) deep basement walk-
out at the rear of an existing dwelling within TRCA's Regulated Area of the Humber River
Watershed. The works were constructed without the benefit of TRCA or municipal
permits. As such, an additional permit application fee of 100% was charged to the
application for this "after -the -fact" permit.
CFN: 56747 - Application #: 1114/16/RH
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: February 14, 2017
RES11311/17 - STANDARD DELEGATED PERMITS
Moved by: Michael Di Biase
Seconded by: Jennifer McKelvie
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.6 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and
Development Division staff and are received monthly by the Executive Committee. Standard Permits , including
Emergency Infrastructure Works permissions, are subject to the authorization of designated staff appointed as
Enforcement Officers, as per Authority Res.#A198/13, #At 99/13 and #A103/15, respectively. All standard and
emergency infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF MARKHAM
22 WORSLEY COURT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to demolish an existing one -storey dwelling and to facilitate the construction
of a two-storey dwelling associated with a municipal building permit..
63
CFN: 57353 - Application #: 0137/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 9, 2017
26 MARKHAVEN ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two-storey dwelling associated with a
municipal building permit.
CFN: 57234 - Application #: 0112/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 6, 2017
6840 14TH AVENUE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the relocation of an existing dwelling to another portion of the
property as well as the construction of a 169.8 sq. m (1,827.7 sq ft) addition to the existing
dwelling associated with a municipal building permit.
CFN: 57019 - Application M 1248/16/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 6, 2017
98 FRED VARLEY DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 4,604 sq. ft (427.7 sq. m) replacement
dwelling associated with a municipal building permit.
CFN: 57018 - Application #: 1247/16/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: January 31, 2017
CITY OF PICKERING
5250 SIDELINE 4 - Duffins Creek Watershed
The purpose is to construct a detached garage at 5250 Sideline 4 in the City of Pickering.
CFN: 56390 - Application #: 0967/161PICK
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 25, 2017
1838 APPLEVIEW ROAD - Petticoat Creek Watershed
The purpose is to construct a new deck and balcony to the rear and a one -storey addition to the
front of the existing single family detached dwelling at 1838 Appleview Road in the City of
Pickering.
CFN: 56648 - Application #: 1185/16/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2017
CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]
219 LAKE SHORE DRIVE - Waterfront Watershed
The purpose is to construct a rear sunroom/basement addition to the existing semi-detached
dwelling at 219 Lake Shore Drive in the City of Toronto (Etobicoke York).
CFN: 57230 - Application #: 0109/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 17, 2017
150 HUMBERCREST BOULEVARD - Humber River Watershed
The purpose is to construct a two-storey rear addition to the existing single family detached
dwelling at 150 Humbercrest Boulevard in the City of Toronto (Etobicoke York).
CFN: 56645 - Application #: 1182/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 30, 2017
19 IRWIN ROAD - Humber River Watershed
The purpose is to facilitate the on-going construction of a new two-storey single family detached
dwelling at 19 Irwin Road in the City of Toronto (Etobicoke York). The existing dwelling has
been demolished.
CFN: 57401 - Application #: 0171/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 14, 2017
1718 WILSON AVENUE - Humber River Watershed
The purpose is to construct an addition to the side (south) of the existing commercial building on
lands municipally described as 1718 Wilson Avenue in the City of Toronto (Etobicoke York).
CFN: 57177 - Application #: 0084/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 26, 2017
65
274 ELLIS AVENUE - Humber River Watershed
The purpose is to construct a three storey rear/side addition, a partial second story addition, and
a rear deck to the existing single family detached dwelling at 274 Ellis Avenue in the City of
Toronto (Etobicoke York).
CFN: 56101 - Application #: 0618/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 17, 2016
ONNI (WESTLANDS) LANDS CORP. - Mimico Creek Watershed
The purpose is to complete the works associated the construction of a 3 metre wide pedestrian
trail and re -naturalization of the valley lands at 2200 Lake Shore Boulevard West. The
associated multi -unit residential condominium has already been constructed.
CFN: 57400 - Application #: 0169/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 16, 2017
423 THE KINGSWAY - Humber River Watershed
The purpose is to construct a new two storey single family detached dwelling with a pool, hot
tub, walkout and associated hardscaping to the rear of 423 The Kingsway in the City of Toronto
(Etobicoke York Community Council Area).
CFN: 56735 - Application #: 1066/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 30, 2017
130 HADRIAN DRIVE - Humber River Watershed
The purpose is to construct a second storey addition to the existing single storey detached
dwelling at 130 Hadrian Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57231 - Application #: 0076/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 8, 2017
CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]
115 BURBANK DRIVE - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage and rear
patio at 115 Burbank Drive in the City of Toronto (North York Community Council Area).
CFN: 56194 - Application #: 0682/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2017
9 MISTY CRESCENT - Don River Watershed
The purpose is to construct a pool and associated hardscaping to the rear of the existing single
family dwelling at 9 Misty Crescent in the City of Toronto (North York Community Council Area).
CFN: 57028 - Application #: 12601161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2017
141 RIVERVIEW DRIVE - Don River Watershed
The purpose is to restore a failed slope and install a new in -ground swimming pool with
associated landscaping at 141 Riverview Drive in the City of Toronto (North York Community
Council Area).
CFN: 55709 - Application #: 0339/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 31, 2017
18 BROOKFIELD ROAD - Don River Watershed
The purpose is to rebuild the existing rear extension of the dwelling, add a new second floor
balcony and replace some existing exterior windows and doors at 18 Brookfield Road in the City
of Toronto (North York Community Council Area).
CFN: 57221 - Application #: 0083/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 1, 2017
31 TIMBERLANE DRIVE - Don River Watershed
The purpose is to construct a second storey addition to the existing single family dwelling at 31
Timberlane Drive in the City of Toronto (North York Community Council Area).
CFN: 56334 - Application #: 0790/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 25, 2017
22 HAWKSBURY DRIVE - Don River Watershed
The purpose is to construct a two-storey replacement dwelling with rear deck at 22 Hawksbury
Drive in the City of Toronto (North York Community Council Area).
67
CFN: 56208 - Application #: 0705/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 31, 2017
MOUNT PLEASANT GROUP OF CEMETERIES - Don River Watershed
The purpose is to back fill and restore two erosion gullies within the upper valley slope of York
Cemetery.
CFN: 57172 - Application #: 0046/171TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 17, 2017
CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]
7 WAXWING PLACE - Don River Watershed
The purpose is to construct a new two storey single family detached dwelling at 7 Waxwing
Place in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is
to be demolished.
CFN: 55491 - Application #: 0208/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 24, 2017
CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]
TORONTO STANDARD CONDOMINIUM CORPORATION NO. 2176 - Don River Watershed
The purpose is to resurface the existing crushed stone walkway with asphalt at 10 Bloorview
Place in the City of Toronto (North York Community Council Area).
CFN: 56912 - Application #: 1203/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 31, 2017
CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]
CITY OF TORONTO - Highland Creek Watershed
The purpose is to replace a pedestrian bridge in Knob Hill Park, located on the east side of
Brimley Road, north of Eglinton Avenue East. Works will involve removal and replacement of
the existing bridge and abutments, followed by restoration of the site. The warm water
construction timing window of July 1 to March 31 will apply to this proposal.
CFN: 56300 - Application #: 0778/16/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: February 8, 2017
70 PAR AVENUE - Highland Creek Watershed
The purpose is to construct a second storey addition over the existing footprint and two storey
rear and side addition at 70 Par Avenue in the City of Toronto (Scarborough Community Council
Area).
CFN: 57037 - Application #: 1276/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 6, 2017
TERRA NOVA GLOBAL BUILDERS INC. - Waterfront Watershed
The purpose is to construct a two-storey replacement dwelling with rear deck and walk -out
basement at 63 Fishleigh Drive in the City of Toronto (Scarborough Community Council Area).
CFN: 56596 - Application #: 1106/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 6, 2017
CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]
ASHBRIDGES BAY YACHT CLUB - Waterfront Watershed
The purpose is to repair the existing seawall at 30 Ashbridges Bay Park Road (Ashbridges Bay
Yacht Club) in the City of Toronto (Toronto and East York Community Council Area).
CFN: 57106 - Application #: 1287/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 3, 2017
734 O'CONNOR DRIVE - Don River Watershed
The purpose is to construct a patio at the rear of the existing dwelling at 743 O'Connor Drive in
the City of Toronto (Toronto and East York Community Council Area).
CFN: 56378 - Application #: 0942/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 2, 2017
METROPOLITAN TORONTO CONDOMINIUM 554 - Don River Watershed
The purpose is to construct repairs to the existing landscape path, stairs and hardscaping at
407 Walmer Road in the City of Toronto (Toronto and East York). This proposal also includes
repairs to the waterproof membrane of an underground garage and replacement of existing
retaining walls.
CFN: 56705 - Application #: 1017/161TOR
Report Prepared by: Anna Lim, extension 5284, email alien@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2017
CITY OF VAUGHAN
1934397 ONTARIO INC. / SONAVOX - Humber River Watershed
The purpose is to permit development within a Regulated Area of the Humber River Watershed
to facilitate site development and the construction of a parking lot and landscaping at 261 Milani
Boulevard, in the City of Vaughan. A new 2 -storey 1,858.06 sq. m (20,000 sq. ft.) industrial
building and associated services, additional parking area and landscaping is also being
constructed on the site, but beyond the TRCA's Regulated Area..
CFN: 56875 - Application #: 1172/16NAUG
Report Prepared by: Mark Andrews, extension 5936, email mandrews@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: February 3, 2017
QUADRANT HOLDINGS INC. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate topsoil stripping, grading and servicing and restoration works and the
installation of sediment and erosion control measures associated with draft approved plans of
subdivision (19T -13V004 & 19T -13V005) within Block 11, east and west side of Thomas Cook
Avenue, south of Lebovic Campus Drive, in the City of Vaughan.
CFN: 53634 - Application #: 0317/15NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: January 31, 2017
147 CAMLAREN CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 223.92 sq. m. (2410.3 sq. ft.) two storey
single detached dwelling and a 12 sq. m. (129.1 sq. ft.) balcony, associated with a municipal
building permit. The subject property is located at 147 Camlaren Crescent, in the City of
Vaughan.
CFN: 57210 - Application #: 0062/171VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: January 24, 2017
70
110 ROSEBURY LANE -Humber River Watershed
The purpose is to facilitate, in the TRCA's Regulated Area of the Humber River Watershed
subject to the Woodbridge Special Policy Area (SPA), the development of a 26.75sgm in -ground
swimming pool, 73.11sgm pool terrace, 33.90sgm garden beds, 5.57sgm cabana, and
60.66sgm soft landscaping at 110 Rosebury Lane, in the City of Vaughan.
CFN: 57356 - Application #: 0127/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 6, 2017
ST. MARGARET MARY ROMAN CATHOLIC CHURCH - Humber River Watershed
The purpose is to facilitate development in a regulated area of the Humber River Watershed to
remove an existing 2 sqm "kitchen" extension of the larger rectory structure, rebuild a wall in
place of where the extension used to be, and undertake works to reconstruct a portion of the
roof line to match the adjusted ground floor footprint. The subject property is known municipally
as 8500 Islington Avenue, in the City of Vaughan.
CFN: 56845 - Application #: 0162/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 13, 2017
TOWN OF AURORA
BELL CANADA - Rouge River Watershed
The purpose is to construct Bell fibre optic conduits along the road right-of-way (ROW) of
Bloomington Road between Highway 404 and Leslie Street..
CFN: 56630 - Application #: 1146/16/AUR
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: January 24, 2017
TOWN OF CALEDON
82 CONNAUGHT CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 37.3 sq.m (401 sq. ft) addition to an existing
dwelling, 23.5 sq. m (253 sq. ft) attached garage and 11.1 sq m (119 sq. ft) ancillary shed
associated with a municipal Minor Variance application (Town File: A027-16) and building
permit.
CFN: 57117 - Application #: 0003/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 8, 2017
71
TOWN OF RICHMOND HILL
254 LENNOX AVENUE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 351.1 sq. m (3,779.2 sq. ft) replacement dwelling
associated with a municipal Minor Variance application (Town File: At 07/16) and building
permit.
CFN: 57125 - Application #: 0012/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 10, 2017
MATTAMY (MONARCH) LIMITED - Humber River Watershed
The purpose is to conduct minor grading works associated with dredging an existing stormwater
management pond within a Regulated Area of the Humber River watershed north of Vitlor Drive
in the Town of Richmond Hill.
CFN: 56346 - Application #: 0816/161RH
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: August 8, 2016
TOWN OF RICHMOND HILL - Rouge River Watershed
The purpose is to reconstruct a portion of Newberry Park Trail, existing CSP culvert and light
posts northeast of Elgin Mills Road West and Yonge Street.
CFN: 56168 - Application #: 0859/16/RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: February 13, 2017
317 RICHMOND STREET - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 600 square foot concrete paver patio at the rear of an
existing two-storey dwelling..
CFN: 57354 - Application M 0130/171RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 9, 2017
72
TOWN OF WHITCHURCH-STOUFFVILLE
86 LAKEVIEW AVENUE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 439 sq. m. (4725.36 sq. ft.) two storey
single detached dwelling, 30 sq. m. (322 .9 sq. ft.) covered porch, sewage septic system and
driveway, associated with a municipal building permit. The subject property is located on lands
known municipally as 86 Lakeview Avenue, in the Town of Whitchurch-Stouffville.
CFN: 54656 - Application #: 0934/15/WS
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: January 24, 2017
TOWNSHIP OF KING
142 MANITOU DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 420 sq. m. (4520.8 sq. ft.) single detached
dwelling, 67 sq. m. (721.2 sq. ft.) swimming pool, 40 sq. m. (430.5 sq. ft.) covered loggia,
replacement sewage septic system and a new driveway, associated with a municipally building
permit. The subject property is located on lands known municipally as 142 Manitou Drive, in the
Township of King.
CFN: 57350 - Application #: 0085/17/KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 6, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency Infrastructure Works
permissions are subject to authorization by staff designated as Enforcement Officers as per Auth. Res. #A198/13 and
#A103/15, respectively. All routine and emergency infrastructure works are located within a Regulated Area,
generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
Flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
ROGERS COMMUNICATIONS CANADA INC
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Queen Street East, from the south west corner of Dixie Road and Queen Street East
intersection to approximately 160 metres east of Dixie Road, in the City of Brampton, Etobicoke
Creek Watershed as located on property owned by the Regional Municipality of Peel. The
purpose is to install a new fibre cable vault on Queen Street East, from the south west corner of
Dixie Road and Queen Street East intersection to approximately 160 metres east of Dixie Road,
in the City of Brampton. No in -water works are associated with this project.
73
CFN: 56493 - Application #: 0010/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: February 13, 2017
CITY OF MARKHAM
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the south side of Regional Road 7 and east of Main Street, in the City of Markham, Rouge
River Watershed as located on the property owned by the Regional Municipality of York under
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to replace an existing
4" gas pipe with a new 4" gas pipe.
CFN: 56835 - Application #: 0103/17/MARK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: February 14, 2017
CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Rosalie Avenue; 19 Rosalie Avenue; 44 Haymarket Road; 16 Meadow Lane Avenue; 18
Meadow Lane Avenue in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed as located on private property and property owned by the City of
Toronto. The purpose is to place conduit. No in -water works are within the scope of this project.
CFN: 56903 - Application #: 1261/161TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 30, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Melbert Road, Norbert Crescent and Old Burnhamthorpe Road in the City of Toronto
(Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on property
owned by the City of Toronto. The purpose is to replace existing watermain. No in -water works
are within the scope of this project.
CFN: 56759 - Application #: 1112/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 30, 2017
74
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance on 110 Coe Hill Drive and
within the boulevard of Coe Hill Drive, east of Windermere Avenue, in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed as located on property
owned by City of Toronto. The purpose is to construct a gas venting system for an existing
landfill. No in -water work is within the scope of this project.
CFN: 56867 - Application #: 1219/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 17, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Humbervale Boulevard, from Sunnylea Avenue West to Reid Manor, in the City of Toronto
(Etobicoke York Community Council Area), Mimico Creek Watershed as located on property
owned by the City of Toronto. The purpose is to undertake watermain replacement. No in -water
work is within the scope of this project.
CFN: 56827 - Application #: 0023/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 10, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Forty Second Street from at Lake Shore Boulevard West to Lake Promenade, in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on
property owned by the City of Toronto. The purpose is to replace existing watermain. No in -
water work is within the scope of this project.
CFN: 57322 - Application #: 0123/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 17, 2017
CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Stilecroft Drive; Benjamin Boake Trail; Honour Court, near Sheppard Avenue West and
Keele Street, in the City of Toronto (North York Community Council Area), Humber River
Watershed as located on property owned by the City of Toronto. The purpose is to install
conduit and grade level boxes. No in -water work is within the scope of this project.
CFN: 56910 - Application #: 0105/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 15, 2017
75
TORONTO TRANSIT COMMISSION
To undertake road/pathway resurfacing or reconstruction, undertake structure maintenance on
1209 Sheppard Avenue East, west of Leslie Street, in the City of Toronto (North York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to undertake structural rehabilitation on Toronto Transit Commissions'
Leslie Station. No in -water work is within the scope of this project.
CFN: 56901 - Application #: 1250/161TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 17, 2017
CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within existing roadways on
St. Clair Avenue East between Birchmount Road and Cotton Avenue, in the City of Toronto
(Scarborough Community Council Area), Don River Watershed as located on property owned
by the City of Toronto. The purpose is to install new conduit and vaults. No in -water work is
within the scope of this project.
CFN: 57169 - Application #: 0066/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 26, 2017
CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Russell Hill Road, from Poplar Plains Road to Clarendon Avenue, in the City of Toronto
(Toronto and East York Community Council Area), Don River Watershed, as located on
property owned by the City of Toronto The purpose is to install conduit and grade level boxes.
No in -water work is within the scope of this project.
CFN: 57321 - Application #: 0106/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 9, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Cedarcrest Boulevard, Ferris Road, Plaxton Road, Plaxton Crescent, Glencrest Boulevard
and Glen Robert Drive in the City of Toronto (Toronto and East York Community Council Area),
Don River Watershed as located on property owned by the City of Toronto. The purpose is to
install conduit and grade level boxes. No in -water work is within the scope of this project.
76
CFN: 56909 - Application #: 0107/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 17, 2017
CITY OF VAUGHAN
CITY OF VAUGHAN
To undertake road reconstruction, undertake sewer and watermain or utility installation or
maintenance within an existing roadway on McKenzie Street south of Highway 7 between
Kipling Avenue and CN Track, in the City of Vaughan, Humber River Watershed as located on
the property owned by City of Vaughan. The purpose is to reconstruct McKenzie Street and
replace existing watermain on McKenzie Street located south of Highway 7, in the City of
Vaughan..
CFN: 57047 - Application #: 0018/17NAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: February 15, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 11 Honey Locust Court, in the City of Vaughan, Don River Watershed as located on the
property owned by a private owner to whom Enbridge Gas Distribution Inc. is providing service.
The purpose is to install a NPS 1 PE IP gas pipeline to service a residential dwelling. No in -
water works are within the scope of this project.
CFN: 56830 - Application #: 0027/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: February 10, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Centre Street from Loudon Crescent to approximately 50 m east of Dufferin Street, in the City of
Vaughan, Don River Watershed as located on property by the Region of York under Franchise
Agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 6 ST DFBE HP
gas pipeline under a watercourse. No in -water works are within the scope of this project. The
warm water construction timing window applies to this project.
CFN: 56834 - Application #: 0102/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: February 10, 2017
77
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
in order to service a residential dwelling located at 317 Richmond Street, in the Town of
Richmond Hill, Don River Watershed as located on the property owned by a private party to
whom Enbridge Gas Distribution Inc. is providing service. The purpose is to install a 1 1/4 PE
IP pipe. No in -water works are associated with this project..
CFN: 57135 - Application #: 0055/171RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: January 27, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 10865 Bayview Avenue, north of Elgin Mills Road East, in the Town of Richmond Hill, Rouge
River Watershed as located on property owned by a private landowner to whom Enbridge Gas
Distribution Inc. is providing service. The purpose is to install a 1" gas pipeline to service a gas
generator. No in -water works are within the scope of this project.
CFN: 56833 - Application #: 0096/171RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: February 9, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are
received monthly by the Executive Committee. The permission of minor works is subject to authorization by the
Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located
within a Regulated Area, outside of the flood plain and in the opinion of staff do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
25 BELLEVILLE DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 108, Plan
43M-1630, (25 Belleville Drive), in the City of Brampton, Humber River Watershed.
CFN: 57176 - Application #: 0051/171BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: January 27, 2017
e
CITY OF PICKERING
1812 GREYABBEY COURT
To install a swimming pool on Part 3 Lot 26, Plan 283, (1812 Grayabbey Court), in the City of
Pickering, Petticoat Creek Watershed.
CFN: 57193 - Application #: 0082/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2017
5068 WILLIAM STREET
To install a swimming pool on Lot 11, Plan 40M14821, (5068 William Street), in the City of
Pickering, Duffins Creek Watershed.
CFN: 57363 - Application #: 0142/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 14, 2017
CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]
2541961 ONTARIO INC.
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 48 Lot
49, Plan 950, (94 Rivercrest Road), in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on the property owned by 2541961 Ontario Inc..
CFN: 57211 - Application #: 0114/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 7, 2017
42 BRENDWIN ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5, 6, Plan
4386, (42 Brendwin Road), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 57218 - Application #: 0080/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 26, 2017
2105 LAWRENCE AVENUE WEST
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 1; Lot 2 Plan 1423, (2105 Lawrence
Avenue West), in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed.
79
CFN: 57102 - Application M 1286/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 1, 2017
43 MONCRIEFF DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 178, Plan
4605, (43 Moncrieff Drive), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 57406 - Application #: 0173/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 21, 2017
72 ELLIS PARK ROAD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 23, Plan M-339, (72 Ellis Park Road), in
the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as
located on the property owned by Jeremy Gutsche.
CFN: 57397 - Application #: 0167/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 15, 2017
38 WOOLTON CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on (38 Woolton
Crescent), in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed.
CFN: 57191 - Application #: 0064/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 25, 2017
CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]
46 CHESTER HILL ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 38, Plan
2191, (46 Chester Hill Road), in the City of Toronto (Toronto and East York Community Council
Area), Don River Watershed.
CFN: 57388 - Application #: 0157/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 10, 2017
CITY OF VAUGHAN
36 SWEET ALEXANDRA COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 26, Plan
65M-4242, (36 Sweet Alexandra Court), in the City of Vaughan, Don River Watershed.
CFN: 57217 - Application #: 0059/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: January 26, 2017
TOWN OF CALEDON
76 GENTLE FOX DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 165, Plan
431-1845, 76 Gentle Fox Drive, in the Town of Caledon, Etobicoke Creek Watershed.
CFN: 57235 - Application #: 0077/171CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 1, 2017
6 DAYBREAK LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on (6 Daybreak
Lane), in the Town of Caledon, Humber River Watershed.
CFN: 57195 - Application #: 0060/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: January 27, 2017
TOWN OF RICHMOND HILL
69 ROUTLEDGE DRIVE
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 29A, Plan 65M-3854, (69 Routledge Drive), in the Town of Richmond Hill,
Humber River Watershed.
CFN: 57364 - Application #: 0138/17/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 10, 2017
139 DEERWOOD CRESCENT
To install a swimming pool on Lot 7, Plan PL 65M3439, (139 Deerwood Crescent), in the Town
of Richmond Hill, Humber River Watershed.
CFN: 56398 - Application #: 0838/161RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 1, 2017
CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]
10.7 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere, on Riverside Drive, from The South Kingsway to Riverside Crescent, in
the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed, as located on property owned by the City of Toronto. The purpose is to
replace an existing retaining wall, as well as watermain and sanitary sewer. No in -water
works are within the scope of this project.
CFN: 56774 - Application #: 1232/16/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Daniel Brent 5774 dbrent@trca.on.ca
Date: February 24, 2017
10.8 118 ROSEBURY LANE
To construct, reconstruct, erect or place a building or structure on 118 Rosebury Lane, in
the City of Vaughan, Humber River Watershed. The purpose is to undertake works
within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the
construction of a 38.3 sq. m. (412.68 sq. ft.) deck located at the rear of an existing single
detached dwelling, associated with a municipal building permit. The subject property is
located at 118 Rosebury Lane, in the City of Vaughan.
CFN: 56304 - Application #: 0829/16NAUG
Report Prepared by: Stephen Bohan 5743 sbohan@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: February 27, 2017
TERMINATION
ON MOTION, the meeting terminated at 10:19 a.m., on Friday, March 3, 2017.
Maria Augimeri
Chair
/ks
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #2/17 was held at TRCA Head Office, on Friday, April 7,
2017. The Chair Maria Augimeri, called the meeting to order at 9:39 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Michael Di Biase
Member
Chris Fonseca
Member
Mike Mattos
Member
Anthony Perruzza
Member
ABSENT
Jennifer Innis Member
Colleen Jordan Member
Jennifer McKelvie Member
RES.#B12/17 -
Moved by:
Seconded by:
MINUTES
Jack Ballinger
Michael Di Biase
THAT the Minutes of Meeting #1/17, held on March 3, 2017, be approved.
CARRIED
DELEGATIONS
4.1. A delegation by Mr. Saeed Ghias, homeowner, in regard to item 7.1 - Request for
Disposal of Toronto and Region Conservation Authority Land, 40 Grovetree
Road.
RES.#B13/17 -
Moved by:
Seconded by:
DELEGATIONS
Maria Augimeri
Anthony Perruzza
THAT above -noted delegation 4.1 be received.
CARRIED
CORRESPONDENCE
6.1. Biennial Tour Save the Date
RES.#B14/17 - CORRESPONDENCE
Moved by: Jack Heath
Seconded by: Jack Ballinger
THAT above -noted correspondence 6.1 be received.
CARRIED
3iennial Tour i ❑
r A
TO DAY
■ ■ • �!� �L �!L L �1�.
Credit Valley Conservation and Conservation
Halton are pleased to invite you to the 2017
Biennial Tour! The tour will showcase some
of the many projects that each Authority has
been involved in to protect the watersheds
for tomorrow.
Guest speakers will include the Honourable
David Crombie, Peter Kelly and many
conservation authority staff and partners.
o
Conservation 49.4v CREDIT VALLEY
Halton CVC CONSERVATION
86
_.
w',
Tour stops will include:
• Examples of innovative green infrastructure
and low impact development solutions
• Tours of major dam repairs, Flood control
structures and real-time water monitoring
stations
• Examples of prairie meadow plantings and
a public wildflower garden
• Conservation area tour, showing large-scale
sediment removal and ongoing management
of Emerald Ash Borer
• Partner projects working to protect the
natural environment
• Urban beach tour, highlighting environmental
and urban development pressures
creditval ley.ca
conservation ha Ito n.ca
Section I — Items for Authority Action
RES.#615/17 - REQUEST FOR DISPOSAL OF TORONTO AND REGION
CONSERVATION AUTHORITY -OWNED LAND
Adjacent to 40 Grovetree Road, City of Toronto, Humber River Watershed,
CFN 56447. Recommendation that the subject TRCA-owned property,
located to the rear of 40 Grovetree Road, in the City of Toronto, Humber
River watershed, be retained in TRCA ownership for conservation
purposes.
Moved by: Vincent Crisanti
Seconded by: Maria Augimeri
THAT item 7.1 — Request for Disposal of Toronto and Region Conservation
Authority -owned Land adjacent to 40 Grovetree Road be deferred to a future Executive
Committee meeting;
AND FURTHER THAT TRCA staff be directed to investigate what erosion mitigation
measures may be undertaken to ensure slope stability on this site.
For Information contact: George Leja, extension 5342, Jae R. Truesdell, extension 5247
Emails: gleia(a�trca.on.ca, jtruesdell cDtrca.on.ca
Date: March 17, 2017
DOE
RES.#B16/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Etobicoke Creek Watershed
Queen's Walk Development Limited, CFN 55532. Acquisition of property
located south of The Queensway and west of The West Mall municipally
known as 2217 The Queensway, in the City of Toronto, under the
"Greenlands Acquisition Project for 2016-2020", Flood Plain and
Conservation Component, Etobicoke Creek watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.58 hectares (1.44 acres), more or
less, of vacant land, located south of The Queensway and west of The West Mall, said land
being Part of Lot 14, Concession 3, designated as Part 1, 2, 3, 4, & 5 on Draft Plan prepared
by Speight Van Norstrand & Gibson Limited on December 20, 2016 under job number
160-0358 municipally known as 2217 The Queensway, in the City of Toronto, be purchased
from Queen's Walk Development Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Andrew Palumbo, Planner, MHBC Planning, Urban
Design & Landscape Architecture, acting as agent for Queen's Walk Development Limited.
Access to the subject lands will be achieved by an interior municipal road to be constructed and
assumed prior to the subject lands being conveyed to TRCA.
Attached is a plan showing the location of the subject lands
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Etobicoke Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Site Plan Application, TRCA staff established the limits of the open space land.
TAXES AND MAINTENANCE
This parcel of land will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(a)trca.on.ca
For Information contact: Brandon Hester, extension 5767
Jae R. Truesdell, extension 5247
Emails: bhester(v7trca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 17, 2017
Attachments: 1
e
Attachment 1
Subject
/property
Legend
M
Toronto and Region
�W Conservation
for The Living City
lase o�nnu
RES.#B17/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Petticoat Creek Watershed
Highglen Homes Limited, CFN 57373. Acquisition of property and a
permanent access easement, located north of Toynevale Road and east of
Rosebank Road South, municipally known as 460 Toynevale Road, in the
City of Pickering, Regional Municipality of Durham, under the "Greenlands
Acquisition Project for 2016-2020", Flood Plain and Conservation
Component, Petticoat Creek watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.36 hectares (0.89 acres), more or
less, of vacant land, located north of Toynevale Road and east of Rosebank Road South,
said land being Part of Lot 122, Registered Plan 350, designated as Part 5 on draft Plan
prepared by ertl surveyors under project number 16379 together with a permanent access
easement containing 0.02 hectares (0.05 acres), designated as Parts 2 and 3 on said draft
Plan, municipally known as 460 Toynevale Road, in the City of Pickering, Regional
Municipality of Durham, be purchased from Highglen Homes Limited;
THAT the purchase price be the nominal sum of $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with John Perciasepe, co-owner, acting as agent for Highglen
Homes Limited.
Access to the subject lands will be achieved through a permanent access easement over Parts 2
and 3 on draft Plan prepared by ertl surveyors under project number 16379.
Attached is a sketch illustrating the location of the subject lands
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Petticoat Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Official Plan Amendment Application, Zoning By-law Amendment Application
and Site Plan Application for residential development, TRCA staff established the limits of the
open space land.
91
TAXES AND MAINTENANCE
Taxes for 2017 have been estimated at $800.00. Based on TRCA's preliminary review of the
environmental criteria for lands that are eligible to receive a property tax exemption under the
provincial Conservation Land Tax Incentive Program, it would appear that the subject property
may be eligible for a tax exemption. It is expected that the subject parcel of land will not
significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(a)trca.on.ca
For Information contact: Brandon Hester, extension 5767
Jae R. Truesdell, extension 5247
Emails: bhester(a)trca.on.ca, jtruesdell(a)trca.on.ca
Date: March 17, 2017
Attachments: 1
92
Attachment 1
...... , ,
\9�401
....................
Z Pettico
C?
`i
Subject
P oa ty
Legend
L�
D
Toronto and Region
Conservation
for The Living City
Lake Orta.
RES.#B18/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Royal Grand Woodbine Developments Inc., CFN 57374. Acquisition of
property located east of Regional Road 27 and north of Rexdale Boulevard,
municipally known as 840 Queens Plate Drive, in the City of Toronto, under
the "Greenlands Acquisition Project for 2016-202", Flood Plain and
Conservation Component, Humber River watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.59 hectares (1.45 acres), more or
less, of vacant land, located east of Regional Road 27 and north of Rexdale Boulevard,
said land being Part of Lot 31, Concession 3, Part of the Unopened Road Allowance
Between Lots 31 & 32, Concession 3 designated as Part 1, 2, 5, 6, 7, 8, 10, 11, 12, 13, 14, 15,
16, 17, 18, 19, 22, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, & 39 on draft Plan
prepared by KRCMAR Surveyors Inc. on January 31, 2017 under job number 08-030
municipally known as 840 Queens Plate Drive, in the City of Toronto, be purchased from
Royal Grand Woodbine Developments Inc.;
THAT the purchase price be the nominal sum of $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by Royal Grand Woodbine
Developments Inc.;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Dan Botelho, Partner, Brattys LLP, acting as agent for
Royal Grand Woodbine Developments Inc.
Access to the subject lands will be achieved through the adjacent TRCA-owned lands located to
the north and west and their existing frontage on Regional Road 27.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of a Site Plan Application for residential development, and the resulting Ontario
Municipal Board Minutes of Settlement, TRCA staff established the limits of the open space land.
M
TAXES AND MAITENANCE
This parcel of land will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(a)trca.on.ca
For Information contact: Brandon Hester, extension 5767
Jae R. Truesdell, extension 5247
Emails: bhester(a)trca.on.ca , jtruesdell(a)trca.on.ca
Date: March 17, 2017
Attachments: 1
95
Subject". c
, m
Property ►Z
Toronto and Region
Legend WI Conservation
- for The Living City*KEL
I 1
RES.#B19/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Pebble Creek Developments Inc., CFN 57441. Acquisition of property
located north of Regional Road 7 and west of Pine Valley Drive, in the City
of Vaughan, Regional Municipality of York, under the "Greenlands
Acquisition Project for 2016-2020", Flood Plain and Conservation
Component, Humber River watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.6628 hectares (4.1 acres) more or
less, of vacant land, located north of Regional Road 7, west of Pine Valley Drive said land
being Part of Lot 6, Concession 7, designated as Blocks 4 and 5 on a draft M -Plan
prepared by Krcmar Surveys Ltd., under Drawing Name 13-136RP04, dated January 16
2017, in the City of Vaughan, Regional Municipality of York, be purchased from Pebble
Creek Developments Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Barry Stern, Director, Graywood Developments acting as
agent for the owners Pebble Creek Developments Inc.
Access to the subject lands will be achieved through its frontage on Regional Road 7.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Official Plan Amendment Application File OP. 14.004, Zoning By-law Amendment
Application File Z.14.025 and Site Plan Application File DA. 15.034 for 59 townhouse dwelling
units, TRCA staff established the limits of the open space land.
97
TAXES AND MAINTENANCE
Taxes for 2016 have been estimated at a maximum of $200. Based on TRCA's preliminary review
of the environmental criteria for lands that are eligible to receive a property tax exemption under
the provincial Conservation Land Tax Incentive Program, it would appear that the subject property
may be eligible for a tax exemption. It is expected that the subject parcel of land will not
significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aD_trca.on.ca; jtruesdell(a)trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae R. Truesdell, extension 5247
Emails: nwells(a)trca.on.ca; ]truesdellnatrca.on.ca
Date: March 20, 2017
Attachments: 1
ac me /
57
1 m
Subje
Property
1�
\/ L 7
o�
ID
—•�.� RE �pNP P
U
a
m
Legend
Toronto and Region YORK DURHAM
Conservation
for The Living City _
PEEL
SITE
TORONTO
iaxe onnne
99 d
RES.#B20/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Duffins Creek Watershed
Cougs (Ajax) Ltd., CFN 57526. Acquisition of property located north of
Rossland Road West and west of Church Street, in the Town of Ajax,
Regional Municipality of Durham, under the "Greenlands Acquisition
Project for 2016-2020", Flood Plain and Conservation Component, Duffins
Creek watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.03 hectares (2.56 acres), more or
less, of vacant land, located north of Rossland Road West and west of Church Street, said
land being Part of Lots 15 and 16, Concession 3 designated as Blocks 160 and 161 on draft
M -Plan prepared by J.D. Barnes Limited, reference number: 15-25-015-02, dated January
10, 2017 in the Town of Ajax, Regional Municipality of Durham, be purchased from Cougs
(Ajax) Ltd.;
THAT the purchase price be the nominal sum of $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mr. Ian McCullough, Vice President of Land
Development, Coughlan Homes.
Access to the subject lands will be achieved through the existing frontage on Harrisview Street.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Duffins Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the subdivision application, TRCA staff established the limits of the open space land.
Further, the subject lands are adjacent to existing TRCA's lands.
100
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the criteria for lands that are eligible to receive a property
tax exemption under the provincial Conservation Land Tax Incentive Program, staff estimates that
the entire subject property may be eligible. The addition of the subject parcel of land is not
expected to significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewonaRtrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae R. Truesdell, extension 5247
Emails: ewongC@trca.on.ca, jtruesdell&trca.on.ca
Date: March 11, 2017
Attachments: 1
101
Attachment 1
Subject
/7--,
Property
Z' ...............
Subject
Property Gteel
ti
ROSSLAN RD W ;
Legend
Toronto and RegionZgDURHAM
Conservation
for The Living CitySITE
O
Leve O�.no
RES.#B21/17 - PROPOSAL TO LEASE TRCA-OWNED LAND
Sawmill Sid Inc.
1352 Lakeshore Road East, City of Mississauga
Regional Municipality of Peel, Lake Ontario waterfront, CFN 54786.
Proposal from Sawmill Sid Inc. to enter into a five-year lease of Toronto
and Region Conservation Authority -owned land for the operation of a
sawmill including storage of logs, lumber, slabs etc. together with
temporary buildings located at 1352 Lakeshore Road East, in the City of
Mississauga, Regional Municipality of Peel, Lake Ontario waterfront.
Moved by: Chris Fonseca
Seconded by: Mike Mattos
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Sawmill Sid Inc. to enter into
a lease agreement for operation of a sawmill located at 1352 Lakeshore Road East, City of
Mississauga, Regional Municipality of Peel;
AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in
furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to
cooperate with Sawmill Sid Inc. in this instance;
THEREFORE LET IT BE RESOLVED THAT TRCA enter into a lease with Sawmill Sid Inc. for
the use of 0.4 hectares (1 acre), more or less, said land being part of Part Lot 5,
Concession 3 SDS, located at 1352 Lakeshore Road East, City of Mississauga, Regional
Municipality of Peel;
THAT the lease with Sawmill Sid Inc. be subject to the following terms and conditions:
(i) that the term of the lease be for five years together with one renewal option for a
further five year period at the sole option of TRCA;
(ii) that consideration be $20,000 per annum with an annual increase of $1,000
throughout the term of the lease plus HST;
(iii) that Sawmill Sid Inc. is to be responsible for all approvals required for construction
and operation of a sawmill and associated equipment;
(iv) Sawmill Sid Inc. shall be solely responsible for any and all costs associated with the
construction and operation of a sawmill and associated equipment;
(v) any other terms and conditions deemed appropriate by the TRCA staff and solicitor;
THAT an archaeological review is to be completed at the expense of Sawmill Sid Inc. with
any mitigative measures being carried out to the satisfaction of TRCA;
AND FURTHER THAT the authorized TRCA officials be directed to take the necessary
action required to implement the lease, including obtaining any necessary approvals and
the signing and execution of documents.
CARRIED
103
BACKGROUND
TRCA was approached by Sawmill Sid Inc. in November 2015 to utilize a portion of TRCA's
premises located to the rear of the Small Arms Building located at 1352 Lakeshore Road East, for
the operation of a sawmill and associated equipment. It was agreed that a one-year trial would
take place between January 1 and December 31, 2016. An agreement for the period was
executed with a rental consideration requirement of 10% of gross income over the term. This
generated a rental income of $18,600 for 2016.
The original operation was installed directly behind the Small Arms Building, however during
2016, the City of Mississauga requested that the Small Arms Building along with 10 acres of land
be transferred to the City of Mississauga for nominal consideration. As a result of this, Sawmill Sid
Inc.'s operation has been relocated to the southwest corner of the subject lands behind the lands
being sold to the City of Mississauga.
Sawmill Sid Inc. provides wood recovery and repurposing services for species that would typically
be chipped or ground and sent to area landfills. In 2016, they recovered in excess of 6,200 cubic
metres within the Greater Toronto Area. Their proposal to develop a "Tree and Wood Recovery
Centre' will provide a location for community members, businesses, arborists and public agencies
to deposit wood and wood debris, purchase repurposed products as well as allowing for individual
and group educational tours and workshops.
Lease Agreement
The area subject to this lease consists of approximately 0.4 hectares (1 acre) of fenced tableland.
The following are the key terms and conditions of the proposed lease arrangement:
1. Lease Payment: $20,000 per annum together with an annual increase of $1,000 plus
HST;
2. Initial Term: five years, together with one extension option for a further five-year term, at
TRCA's sole option;
3. Insurance: Sawmill Sid Inc. will provide $5,000,000 in commercial general liability
insurance;
4. Taxes and Utilities: Sawmill Sid Inc. will be responsible for all applicable taxes and
utilities;
5. Further Approvals: Sawmill Sid Inc. will comply with any applicable laws, directions,
rules and regulations;
Attached is a sketch of the leased area.
RATIONALE
Entering into a lease agreement with Sawmill Sid Inc. would allow for the continued development
and operation of a wood and debris repurposing centre servicing the Greater Toronto Area. To
date Sawmill Sid Inc. has saved over 2,257 tonnes of carbon through the salvaging, recycling and
repurposing of wood that would have otherwise been chipped and deposited into landfills.
Sawmill Sid Inc. also has partnered with the Ministry of Natural Resources and Forestry to provide
educational workshop opportunities to local school boards. Once a year, Sawmill Sid Inc. hosts
"The Urban Forestry Youth Initiative." This program allows students from across the GTA to join
together at Sawmill Sid's to observe the sawmill in action, learn the role of forests in climate
change as well as provide hands-on skills in the fields of arboriculture, urban forestry and
community engagement to prepare for employment and/or post -secondary education.
104
FINANCIAL DETAILS
The $20,000.00 per year in revenues generated from this lease will be used for TRCA purposes.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(cDtrca.on.ca
For Information contact: Brandon Hester, extension 5767,
Jae R. Truesdell, extension 5247
Emails: bhester(c)trca.on.ca, jtruesdell ccDtrca.on.ca
Date: March 22, 2017
Attachments: 1
105
ch /
c r
W
LAKESHORE RD E
Mississauga '
1
Transfer Lands
Access Route /
� f
Lease Area
r
1
1
z
Lake Ontario
Legend
Toronto and Region4-/
DURHAM
Conservation
%r The Living City-
® O
Saxe Ontario
RES.#B22/17 - PROPOSAL TO LEASE TRCA—OWNED LAND
Watershed Realty Inc.
8712 Claireville Conservation Road, City of Brampton, Regional
Municipality of Peel, Humber River Watershed, CFN 54482. Proposal from
Watershed Realty Inc. to enter into a 10 -year lease and contribute capital
assistance in restoring a Toronto and Region Conservation
Authority -owned heritage listed home located at 8712 Claireville
Conservation Road, in the City of Brampton, Regional Municipality of Peel,
Humber River watershed.
Moved by: Mike Mattos
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Watershed Realty Inc. to
enter into a lease agreement for operation of a plant nursery and garden centre, located at
8712 Claireville Conservation Road, City of Brampton, Regional Municipality of Peel;
AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in
furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to
cooperate with Watershed Realty Inc. in this instance;
THEREFORE LET IT BE RESOLVED THAT TRCA enter into a lease with Watershed Realty
Inc. for the use of 1.62 hectares (4 acres), more or less, said land being part of Part Lot 1,
Concession 9 ND, located at 8712 Claireville Conservation Road, City of Brampton,
Regional Municipality of Peel;
THAT the lease with Watershed Realty Inc. be subject to the following terms and
conditions:
(i) that the term of the lease be for 10 years together with two renewal options for
successive five year periods at the sole option of TRCA;
(ii) that consideration be the nominal sum of $12.00 per annum plus HST along with a
capital investment of $400,000 for building restoration, to be completed within 2
years of execution of the lease agreement, to the satisfaction of TRCA staff;
(iii) that Watershed Realty Inc. is to be responsible for all approvals required for
construction and operation of a plant nursery and garden centre;
(iv) Watershed Realty Inc. shall be solely responsible for any and all costs associated
with the construction and operation of a plant nursery and garden centre;
(v) any other terms and conditions deemed appropriate by TRCA staff and solicitor;
THAT an archaeological review is to be completed at the expense of Watershed Realty Inc.
with any mitigative measures being carried out to the satisfaction of TRCA;
107
THAT said lease be subject to approval by the Minister of Natural Resources and Forestry
in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O. 1990,
Chapter C.27 as amended;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
required to implement the lease, including obtaining any necessary approvals and the
signing and execution of documents.
AMENDMENT
RES.#B23/17
Moved by: Mike Mattos
Seconded by: Jack Heath
THAT the following be inserted after the main motion:
AND FURTHER THAT staff be directed to investigate the feasibility of leasing the lands
between McVean Drive and this property.
THE AMENDMENT WAS
THE MAIN MOTION, AS AMENDED, WAS
CARRIED
CARRIED
BACKGROUND
The property was vacated by a residential tenant in 2005. After numerous unsuccessful attempts
to repurpose the existing home, TRCA staff reviewed the building and it was subsequently
scheduled for demolition. In 2009 TRCA submitted a demolition permit application. In December
2009, as part of City of Brampton's demolition permit review process, the home received heritage
listed status from the City of Brampton. As part of this listing, a request to repurpose the building
was received by TRCA, thereby suspending any demolition proceedings pending further
investigation into potential uses. Consultations between TRCA staff, members of Brampton
Heritage and City of Brampton staff yielded a consensus that the home could be repurposed and
restored by a commercial or other private user. A request for proposal was issued in August 2011
and distributed to potential user groups and area real estate offices. This request for proposals
received no formal submissions. In August 2013, the request for proposals was updated and
re -distributed, again receiving no formal submissions.
TRCA was approached by Watershed Realty Inc. on February 8, 2016, initiating negotiations to
utilize approximately 1.62 hectares (4 acres) of its premises at Claireville Conservation Area
including a heritage listed home known as the" Robinson House" located at 8712 Claireville
Conservation Road for the operation of a plant nursery and garden centre that would be
accessible to the general public.
TRCA staff met with City of Brampton Planning staff in May 2016 to discuss zoning and
acceptable uses for the site. A plant nursery and garden centre was a supported use, however,
will require a minor variance application. This use would also complement TRCA's nursery
initiatives and planting programs. In February 2017, Watershed Realty Inc. staff met with TRCA
Restoration and Infrastructure staff to discuss possible synergies and future planting needs. This
use and initiative is supported by Restoration and Infrastructure staff due to its complimentary
nature.
ME;
Lease Agreement
The area subject to this lease consists of a heritage listed home together with approximately 1.62
hectares (4 acres) of land. The following are the key terms and conditions of the proposed lease
arrangement:
1. Lease Payment: $1.00/month, plus HST;
2. Capital Investment: $400,000;
3. Initial Term: 10 years; with two renewal options of five years each at TRCA's sole option
and subject to a fair market rent valuation;
4. Insurance: Watershed Realty Inc. will provide $5,000,000 in commercial general liability
insurance;
5. Taxes and Utilities: Watershed Realty Inc. will be responsible for all property taxes and
utilities;
6. TRCA will have exclusive right of ingress and egress across the lands for use by TRCA
employees, their equipment and machinery.
Within the first two years of the lease the tenant shall restore the subject building to a
weatherproof and useable condition. The following represents the items that Watershed Realty
Inc. ensures and commits to complete within the first year of the lease agreement:
1. Repair all structural areas associated with the roof.
2. Repair or replace all existing troughing, soffit and downspouts in a professional and
workmanlike manner.
3. Repair all stucco and wood areas to conform to the existing exterior. In the event that
certain materials are not available due to the age of the premises, the Tenant will use its
sole discretion in choosing a compatible replacement.
4. Repair or replace windows and/or frames in order to create an airtight environment.
5. Arrange to have all electrical services inspected by a qualified electrician. In the event that
there are deficiencies, Tenant agrees to repair all areas of concern.
6. Repair or replace the heating system as required.
7. Repair or replace all plumbing and plumbing fixtures throughout the premises.
8. Provide millwork in the kitchen area.
9. Repair all damaged and worn out foundation, both on the exterior and interior of the home.
10. Install central air conditioning throughout the premises.
The following represents the items that Watershed Realty Inc. ensures and commits to complete
within the second year of the lease agreement:
1. Installation of greenhouses.
2. Placement of bin blocks (aggregate storage).
3. Installation of an equipment storage facility.
4. Installation of a 30 X 80 -foot shelter.
5. Installation of a 30 X 40 -foot shelter.
6. Installation of an entrance and sitting area.
7. Installation of a parking area.
8. Installation of security fencing.
9. Installation of electrical and water conduits.
10. Repair and paint the interior of the premises.
Attached is a sketch illustrating the location of the subject lands.
109
RATIONALE
Entering into the lease agreement would allow for the development and operation of a plant
nursery and garden centre serving contractors and the general public in the Brampton area as
well as supporting TRCA nursery initiatives and planting programs. This agreement will also
facilitate investment in and renovation and restoration of a TRCA-owned heritage building.
FINANCIAL DETAILS
The capital contribution of $400,000 in lieu of rent from Watershed Realty Inc. will be used for the
renovation and restoration of the heritage listed home and adjacent land located at 8712
Claireville Conservation Road. All applicable taxes and utilities shall be paid by Watershed Realty
Inc. Based upon the capital investment the lease agreement is in line with market rents, as per the
rental valuation prepared by Dino Bottero and Associates on January 12, 2017.
Report Prepared by: Brandon Hester, extension 5767
Emails: bhester(cVtrca.on.ca
For Information contact: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(a)trca.on.ca, jtruesdell(dtrca.on.ca
Date: March 23, 2017
Attachments: 1
110
J
Subject
tiG�b Property J
.....�
Legend
Conservation
for The Living City -
PEEL
SITE
L�
RES.#624/17 - LAKEVIEW WATERFRONT CONNECTION PROJECT
Contracts #10003792, #10003793, #10003794, #10003795 and
#10003797. Award of contracts #10003792, #10003793, #10003794,
#10003795 and #10003797 for the supply and delivery of various
aggregates.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract #10003792 for the supply
and delivery of 3,875 tonnes of 225 — 450 mm rip rap stone to the Lakeview Waterfront
Connection Project (LWCP) in the City of Mississauga, be awarded to Glenn Windrem
Trucking for a total unit price of $31.80 per tonne and a total cost not to exceed
$123,225.00, plus a contingency of 10% to be expended as authorized by Toronto and
Region Conservation Authority (TRCA) staff, plus HST, it being the lowest bidder meeting
TRCA specifications;
THAT Contract #10003793 for the supply and delivery of approximately 2,485 tonnes of 0.4
— 0.8 tonne non -stackable armourstone to the LWCP, be awarded to Glenn Windrem
Trucking for a total unit price of $30.80 per tonne and a total cost not to exceed $76,538.00,
plus a contingency of 10% to be expended as authorized by TRCA staff, plus HST, it being
the lowest bidder meeting TRCA specifications;
THAT Contract #10003794 for the supply and delivery of approximately 6,815 tonnes of 2 —
5 tonne non -stackable armourstone to the LWCP, be awarded to Atlantis Marine
Construction Canada Inc. for a total unit price of $51.00 per tonne and a total cost not to
exceed $347,565.00, plus a contingency of 10% to be expended as authorized by TRCA
staff, plus HST, it being the lowest bidder meeting TRCA specifications;
THAT Contract #10003795 for the supply and delivery of approximately 6,450 tonnes of 3 —
5 tonne non -stackable armourstone to the LWCP, be awarded to Glenn Windrem Trucking
for a total unit price of $45.50 per tonne and a total cost not to exceed $293,475.00, plus a
contingency of 10% to be expended as authorized by TRCA staff, plus HST, it being the
lowest bidder meeting TRCA specifications;
THAT Contract #10003797 for the supply and delivery of approximately 1,350 tonnes of 6 —
8 tonne armourstone with flat bottom and top to the LWCP, be awarded to Atlantis Marine
Construction Canada Inc. for a total unit price of $51.00 per tonne and a total cost not to
exceed $68,850.00, plus a contingency of 10% to be expended as authorized by TRCA
staff, plus HST, it being the lowest bidder meeting TRCA specifications;
THAT should staff be unable to achieve an acceptable contract with the awarded
suppliers, staff be authorized to enter into and conclude contract negotiations with the
other suppliers that submitted quotations, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take all necessary actions
to implement the foregoing, including the signing and execution of any documents.
CARRIED
112
BACKGROUND
The Regional Municipality of Peel, Credit Valley Conservation (CVC), and TRCA, are
collaborating in the development of a new natural waterfront park amenity along the eastern
waterfront in the City of Mississauga, known as the Lakeview Waterfront Connection. The project
goals and objectives are to: provide public access to and along the waterfront, recreate lost
coastal wetlands, allow fish access to Serson Creek, re-establish extensive new meadow and
forest coastal habitats, and to soften the existing shoreline by increasing the amount of beach
habitat within the area.
The Lakeview Waterfront Connection Project is being constructed in various stages. Construction
of the first rubble confinement cell, located west of Serson Creek to the existing east Ontario
Power Generation (OPG) pier, commenced in November 2016 with completion expected by
March 31, 2017. Closing of the first confinement cell will provide capacity for approximately
190,000 cubic metres of fill material and construction of approximately 150 linear metres of
armourstone revetment west of the future outlet of Serson Creek. Work is scheduled to
commence in July 2017 following opening of the warm fisheries window for in -water work.
RATIONALE
Quotation packages were sent to 20 suppliers as follows:
Allstone Quarry Products Inc.;
Bot Aggregates Ltd.;
Brent Quarry;
B -Town Group;
Cambridge Aggregates;
CDR Young's Aggregates Inc.;
Fowler Construction;
Glenn Windrem Trucking;
J.C. Rock Limited;
J. Jenkins & Son Landscape Contractors Limited;
James Dick Construction Limited;
Lafarge Canada;
Maxwell Stone;
Miller Paving Limited;
Nelson Aggregate Co.;
R.W. Tomlinson Limited;
Redstone Quarries;
Ritchie Rocls, division of L. Ritchie Logistics;
Stonescale Quarry and Fabrication
Strada Aggregates; and
Furthermore, Request for Tender #10003792, #10003793, #10003794, #10003795 and
#10003797 were publicly advertised on the electronic procurement website www.biddingo.com
on February 14, 2017. The Procurement Opening Committee opened tenders on March 1, 2017
with the following results:
113
Contract #10003792 - Supply and Delivery of 3,875 tonnes of 225 — 450mm Rip Rap Stone
BIDDER
TOTAL UNIT
PRICE
Plus HST
TOTAL
VALUE OF
CONTRACT
Plus HS
Glenn Windrem Trucking
$31.80
$123,225.00
Atlantis Marine Construction
$36.00
$139,500.00
Redstone Quarries
$35.00
$135,625.00
CDR Young's Aggregates Inc.
$40.80
$158,100.00
Ritchie Rocks
$36.50
$141,437.50
Cut Above Natural Stone
$33.80
$130,975.00
Contract #10003793 - Supply and Delivery of 2,485 tonnes of 0.4 — 0.8 Tonne
Non -Stackable Armourstone
BIDDER
TOTAL UNIT
PRICE
(Plus HST)
TOTAL
VALUE OF
CONTRACT
Plus HST
Glenn Windrem Trucking
$30.80
$76,538.00
Atlantis Marine Construction
$36.00
$89,460.00
Redstone Quarries
$35.00
$86,975.00
CDR Young's Aggregates Inc.
$40.80
$101,388.00
Ritchie Rocks
$49.50
$123,007.50
Cut Above Natural Stone
$46.75
$116,173.75
Contract #10003794 - Supply and Delivery of 6,815 tonnes of 2 — 5 Tonne Stackable
Armourstone
BIDDER
TOTAL UNIT
PRICE
Plus HST
TOTAL
VALUE OF
CONTRACT
Plus HS
Glenn Windrem Trucking
$64.00
$436,160.00
Atlantis Marine Construction
$51.00
$347,565.00
Redstone Quarries
NO BID
NO BID
CDR Young's Aggregates Inc.
$66.95
$456,264.25
Ritchie Rocks
$61.50
$419,122.50
Cut Above Natural Stone
$60.43
$411,830.45
Contract #10003795 - Supply and Delivery of 6,450 tonnes of 3 — 5 Tonne Non -Stackable
Armourstone
BIDDER
TOTAL UNIT
PRICE
Plus HST
TOTAL
VALUE OF
CONTRACT
Plus HST
Glenn Windrem Trucking
$45.50
$293,475.00
Atlantis Marine Construction
$50.00
$322,500.00
Redstone Quarries
NO BID
NO BID
CDR Young's Aggregates Inc.
$54.00
$348,300.00
Ritchie Rocks
$59.50
$383,775.00
Cut Above Natural Stone
$52.78
$340,431.00
114
Contract #10003797 - Supply and Delivery of 1,350 tonnes of 6 — 8 Tonne Armourstone
with flat bottom and top pieces
BIDDER
TOTAL UNIT
PRICE
Plus HST)
TOTAL
VALUE OF
CONTRACT
Plus HST
Glenn Windrem Trucking
$56.00
$75,600.00
Atlantis Marine Construction
$51.00
$68,850.00
Redstone Quarries
NO BID
NO BID
CDR Young's Aggregates Inc.
$54.00
$72,900.00
Ritchie Rocks
$61.50
$83,025.00
Cut Above Natural Stone
$57.48
$77,598.00
Based on the tenders received, staff recommends that:
Glenn Windrem Trucking be awarded Contract #10003792 for the supply and delivery of
3,875 tonnes of 225 — 450mm rip rap stone for the unit cost of $31.80 per tonne and a
total cost not to exceed $123,225.00, plus HST;
Glenn Windrem Trucking be awarded Contract #10003793 for the supply and delivery of
2,485 tonnes of 0.4 — 0.8 tonne non -stackable armourstone for the unit cost of $30.80 per
tonne and a total cost not to exceed $76,538.00, plus HST
Atlantis Marine Construction Canada Inc. be awarded Contract #10003794 for the supply
and delivery of 6,815 tonnes of 2 — 5 tonne stackable armourstone for the unit cost of
$51.00 per tonne and a total cost not to exceed $347,565.00, plus HST;
Glenn Windrem Trucking be awarded Contract #10003795 for the supply and delivery of
6,450 tonnes of 3 — 5 tonne non -stackable armourstone for the unit cost of $45.50 per
tonne and a total cost not to exceed $293,475.00, plus HST;
Atlantis Marine Construction Canada Inc. be awarded Contract #10003797 for the supply
and delivery of 1,350 tonnes of 6 — 8 tonne armourstone with flat bottom and top pieces
for the unit cost of $51.00 per tonne and a total cost not to exceed $68,850.00, plus HST
it being the lowest bidder meeting TRCA staff specifications.
These contracts are subject to a 10% contingency to be expended as authorized by TRCA staff.
As Atlantis Marine Construction Canada Inc. is a new supplier to TRCA, staff contacted
references and verified they are able to meet material specifications and delivery requirements.
Furthermore, TRCA will be conducting quarry inspections to verify that the material is of good
quality and meets contract specifications. The licenses of the quarries which the lowest bidders
will use to supply the aggregates have been verified to be legitimate and fully licensed using the
Ontario government's "find pits and quarries' online tool at the following URL address:
https://www.ontario.ca/environment-and-energy/find-pits-and-quarries. One of the three quarries
that is to be used by Glenn Windrem does not contain a license number and is not subject to the
Aggregate Resources Act or its predecessor the Pits and Quarries Control Act as per letter by the
Ministry of Natural Resources and Forestry.
This project to create a new park along Lakeview's shoreline is in line with TRCA's 10 -Year
Strategic Plan Objective #3, which is to rethink greenspace to maximize its value, and Objective
#7 which seeks to build partnerships and new business models. The Lakeview Waterfront
Connection Project helps TRCA achieve these strategic objectives by creating new greenspace
along the waterfront, and through strengthening TRCA's partnership with the Region of Peel and
its neighbouring conservation authority, Credit Valley Conservation.
115
FINANCIAL DETAILS
Funding for this project is available from the Region of Peel, within Account #252-52.
Report prepared by: Ron Ofer, 647-501-0856
Email: rofer(a)trca.on.ca
For Information contact: Mike Puusa, 647-212-2941
Email: mpuusa(a)trca.on.ca
Date: March 8, 2017
116
RES.#B25/17 - LESLIE ELGIN DEVELOPMENTS INC.
Request for a Permanent Easement for a Stormwater Pond Outfall
Town of Richmond Hill, Regional Municipality of York, Rouge River
Watershed, CFN 57521. Request from Leslie Elgin Developments Inc. and
the Town of Richmond Hill to provide a permanent easement for a new
stormwater pond outfall, located north of Elgin Mills Road East and east of
Leslie Street in the Town of Richmond Hill, Regional Municipality of York,
Rouge River watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Leslie Elgin Developments
Inc. and the Town of Richmond Hill to provide a permanent easement for a new
stormwater pond outfall, located north of Elgin Mills Road East and east of Leslie Street, in
the Town of Richmond Hill, Regional Municipality of York, Rouge River watershed;
AND WHEREAS it is in the opinion of TRCA in furthering its objectives, as set out in
Section 20 of the Conservation Authorities Act, to cooperate with Leslie Elgin
Developments Inc. and the Town of Richmond Hill in this instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 0.04
hectares (0.11 acres), more or less, be granted in favour of the Town of Richmond Hill for a
new stormwater pond outfall, designated as Part of Blocks 8 and 9 on Plan 65M-3997,
subject to the following terms and conditions;
THAT consideration be the sum of $73,194. All legal, appraisal, survey and other costs be
paid by Leslie Elgin Developments Inc.;
THAT Leslie Elgin Developments Inc. and the Town of Richmond Hill shall fully indemnify
and save harmless TRCA from any and all claims from injuries, damages or loss of any
nature resulting in any way, either directly or indirectly, from the granting of this easement
or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of Leslie Elgin Developments
Inc.;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval, in accordance with existing TRCA landscaping
guidelines, at the expense of Leslie Elgin Developments Inc.;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained prior to
commencement of construction;
THAT the transaction be completed on terms and conditions satisfactory to TRCA staff
and solicitor;
117
THAT said easement be subject to the approval of the Ministry of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Leslie Elgin Developments Inc. approached TRCA to negotiate a permanent easement required
by the Town of Richmond Hill. The proposed stormwater pond outfall will service a stormwater
facility required as part of the adjacent development lands owned by Leslie Elgin Developments
In accordance with TRCA review guidelines "Use of Authority Owned Lands for Stormwater
Management Facilities" approved at Authority Meeting #11/92, held on January 22, 1993, the
proponent has demonstrated that the proposed location on TRCA-owned land is reasonable and
all technical requirements of TRCA staff has been satisfied. A detailed design will be carried out
prior to construction of the stormwater pond outfall, and a permit will be required under Ontario
Regulation 166/06, as amended.
Extensive public consultation has taken place throughout the planning process for this
development including the North Leslie Secondary Plan, Master Environmental Servicing Plan,
Environmental Management Plan and the approved draft plan of subdivision.
The subject lands are part of a larger parcel acquired from Riotrin Properties (Richmond Hill) Inc.
on June 28, 2007 under the Greenlands Acquisition Project 2006-2010.
Plantings:
All lands disturbed by construction will be stabilized and, where deemed appropriate by
TRCA staff, revegetated with native woody and herbaceous plant material in accordance
with existing TRCA landscaping guidelines. A landscaping plan was prepared and form
part of the permit pursuant to Ontario Regulation 166/06, as amended.
A sketch illustrating the permanent easement location is attached.
FINANCIAL DETAILS
The easement compensation is based on market value as determined by D. Bottero & Associates
Limited. Leslie Elgin Developments Inc. has agreed to assume all legal, appraisal, survey and
other costs involved in completing this transaction. Funds obtained from this permanent
easement will be utilized for the purchase of priority properties under the Greenlands Acquisition
Project and for the Long Term Office Accommodation Project.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewona(c trca.on.ca, itruesdell(rDtrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(ZDtrca.on.ca, jtruesdell@trca.on.ca
Date: March 23, 2017
Attachments: 1
118
Attachment
I
/ Permanent
. ��. Easement
Legend
0
W Conservation
for The Living City
NOL
MW
".¢°Marla
RES.#B26/17 - METROLINX
Request for Permanent Easement Required for Culvert and Embankments
City of Vaughan, Regional Municipality of York, Don River Watershed, CFN
51744. Receipt of a request from Metrolinx to provide a permanent
easement required for a culvert and embankments as part of the Go Barrie
Double Track Project, located east of Keele Street and south of Langstaff
Road, in the City of Vaughan, Regional Municipality of York, Don River
watershed.
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Metrolinx to provide a
permanent easement required for a culvert and embankments, located east of Keele Street
and south of Langstaff Road, City of Vaughan, Regional Municipality of York, Don River
watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with Metrolinx in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 7.12 hectares
(17.61 acres), more or less, described as Part of Block A, Plan M-1801, Part of Block A,
Plan M-1832 and Part of Lot 10, Concession 3, designated as Parts 1-8 inclusive on Plan
65R-35943, City of Vaughan, Regional Municipality of York, be granted in favour of
Metrolinx;
THAT consideration be the nominal fee of $2.00. All legal, survey and other costs are to be
paid by Metrolinx;
THAT Metrolinx shall fully indemnify and save harmless TRCA from any and all claims
from injuries, damages or loss of any nature resulting in any way, either directly or
indirectly, from the granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of Metrolinx;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of Metrolinx;
THAT the transaction be completed on terms and conditions satisfactory to TRCA staff
and solicitor;
THAT said easement be subject to the approval of the Ministry of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
120
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Metrolinx has requested a permanent easement required for a new culvert and embankments for
the Go Barrie Double Track Project construction planned to expand rail and commuter capacity.
The Go Barrie Double Track Project proposes to add a second track segment at various points
throughout the Barrie rail line. The construction of the extra track requires the replacement of the
existing culvert located in proximity to the West Don River. The new culvert will support a new
rail bed for the second track.
Metrolinx has submitted a voluntary review package for comment to TRCA Environmental
Assessment staff. Metrolinx is an agency of the Province of Ontario and is therefore not subject to
Ontario Regulation 166/06, as amended. TRCA Environmental Assessment staff has reviewed
Metrolinx's submission and have no concerns.
Nominal consideration for the easement is considered reasonable and fair as the granting of this
easement is beneficial to public transit initiatives in the Greater Toronto Area which support
TRCA's strategic plan by promoting sustainable living and developing sustainable communities.
The subject property was acquired from Metrus Industrial Parks Ltd. on May 30, 1978 and
Von -land Corporation Ltd. on January 29, 1979 and on June 27, 1984 under the Don River Flood
Plain Lands Project.
A sketch illustrating the location of the permanent easement is attached.
FINANCIAL DETAILS
Metrolinx has agreed to assume all legal, survey and other costs involved in completing this
transaction.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewongAtrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(dtrca.on.ca, jtruesdell(cDtrca.on.ca
Date: February 7, 2017
Attachments: 1
121
W
N
r
Permanent
Easement��
.l
l
Legend
WToronto and RegionV�EEL
Conservation
for The Living City
Section II — Items for Executive Action
RES.#B27/17 - HUMBER FLOODPLAIN MAPPING UPDATE
Humber River Watershed, Region of Peel. Award of contract for
floodplain mapping update for the Humber River watershed, Region of
Peel.
Moved by: Mike Mattos
Seconded by: Michael Di Biase
THAT Contract #10002859 for the engineering services required to complete the
floodplain mapping update for the Humber River watershed in the Region of Peel be
awarded to Cole Engineering at total cost not to exceed $97,126, plus HST, Cole being
the highest ranked proponent resulting from the evaluation criteria set out in the Request
for Proposals (RFP);
THAT Toronto and Region Conservation Authority (TRCA) staff be authorized to approve
additional expenditures to a maximum of $19,500 (approximately 20% of the project cost)
in excess of the contract cost as a contingency allowance if deemed necessary;
THAT should staff be unable to negotiate a mutually acceptable agreement with the
above-mentioned proponent, staff be authorized to enter into contract negotiations with
the next highest ranked proponent;
AND FURTHER THAT authorized TRCA officials be directed to take such actions as is
necessary to implement the contract including the signing and execution of documents.
CARRIED
BACKGROUND
TRCA has identified the need to update the hydraulic modelling and floodplain mapping for the
Humber River watershed in the Region of Peel. The project will involve a comprehensive
hydraulic model update of the West Humber and Main Humber River subwatersheds within the
City of Brampton and the Town of Caledon, resulting in approximately 65 updated floodplain
map sheets within the study area.
Currently, the floodplain mapping for the Humber River watershed in Peel Region consists of
hydraulic modelling and topographic mapping that was last updated in the early 2000's by
various consulting teams using the HEC -RAS (Hydrologic Engineering Center River Analysis
System) computer model. It is TRCA's best practice to update floodplain mapping (hydraulic
models and topographic mapping) every 10-15 years to incorporate land use changes,
hydrology modelling updates, new data and new modelling technologies.
Since the previous floodplain mapping updates, TRCA has completed a comprehensive
hydrology modelling study of the Humber River watershed (2015) which established new
Regional Storm (Hurricane Hazel) flow values using up to date land use, meteorological and
stream flow monitoring information. The updated Regional Storm flow estimates and recently
acquired LiDAR topographic information will be utilized for this floodplain mapping update.
The project will involve developing a comprehensive subwatershed scale hydraulic model
utilizing the HEC -RAS hydraulic model to provide flood elevation estimates for the 2-350 year
and Regional storms throughout the Humber River watershed in the Region of Peel. HEC -RAS
is well suited for this assignment as it is the industry standard for hydraulic modeling of river
systems, and is used broadly across TRCA and the Province of Ontario. Once completed, the
123
model will be used to update TRCA's floodline mapping, flood forecasting and warning systems
and flood emergency response plans.
The project will take approximately 10 months to complete, with an anticipated completion date
of January 2018.
RATIONALE
Engineering Services staff completed a public prequalification process through biddingo.com
and identified seven firms to invite to the formal bidding process based on the following:
corporate profile;
project manager qualifications and experience;
relevant project experience;
staff qualifications;
GIS expertise; and
experience in hydraulic modelling and mapping.
Request for Proposal #10002859 was sent to the following seven engineering firms on
February 2, 2017:
AMEC Foster Wheeler;
Civica Infrastructure;
Cole Engineering;
J.F. Sabourin & Associates;
Greck & Associates Ltd.;
KGS Group; and
WSP Canada.
TRCA's Engineering Services undertook a digital submission process utilizing biddingo whereby
only digital submissions would be provided to TRCA. TRCA staff collected digital submissions of
the technical and financial proposals from biddingo, on February 24, 2017 with the following fee
results:
Consulting Firms
Fees
Plus HST
KGS Group
$80,510
Cole Engineering
$97,156
Greck & Associates Ltd.
$97,925
WSP Canada
$118,405
Civica Infrastructure
$142,860
AMEC Foster Wheeler
$217,382
J.F. Sabourin &Associates
$265,829
Members of the selection committee, consisting of Engineering Services staff (Nick Lorrain, Rob
Chan, Wilfred Ho and Ying Qiao), reviewed the proposals based on a weighted scoring system
consisting of the following:
124
Evaluation Criteria
Weighting
Conformance with the terms of the RFP
5%
Similar Projects; scope and magnitude
20%
Understanding of scope of work
35%
Expertise and availability of project team
15%
Cost
25%
The averaged results from the staff evaluation of the proposals are as follows:
Consulting Firms
Ranking out of 100%
Cole Engineering
86
KGS Group
85
Greck & Associates Ltd.
82
AMEC Foster Wheeler
78
Civica Infrastructure
75
WSP Canada
75
J.F. Sabourin & Associates
68
Based on the evaluation of the bids, it was concluded that the combined technical and fee
proposal valued at $97,156 submitted by Cole Engineering offered the best service for value
among the engineering firms whose technical capacity matched the project needs. Although
KGS Group provided a lower bid price, their combination of lack of experience in the project
area resulted in lower technical scores. Furthermore, KGS Group, who had the lowest bid,
allocated the least amount of time to work on the project (approximately 22% less time than
Cole Engineering).
Cole Engineering has extensive knowledge of hydraulic modelling, specifically modelling for
floodplain mapping purposes and has completed a number of projects of similar size and scale.
The fee schedule provided in Cole's proposal was deemed reasonable and consistent with past
fee estimates provided for similar types of projects. Staff is confident that Cole Engineering will
provide TRCA with the desired product within the specified schedule and budget and therefore
recommend that Contract #10002859 be awarded to Cole Engineering for the base cost of
$97,156, plus HST, as they are able to provide the valuable technical experience required and
have a clear understanding of the scope of work as defined in the RFP.
FINANCIAL DETAILS
Funds required to complete this project are available from the Region of Peel in TRCA's Peel
Hydrology and Floodline Mapping account 129-17.
Funding Municipality
Accounts
Budget
Contingency
Region of Peel
129-17
$97,156
$19,500
-Excluding HST
A maximum upset limit of $97,156 plus 20% contingency, plus HST has been set for this
project.
Report prepared by: Nick Lorrain, extension 5278, Sameer Dhalla, extension 5350
Emails: nlorrain(abtrca.on.ca, sdhallaAtrca.on.ca
Date: March 17, 2017
125
RES.#B28/17 - ACQUISITION OF A PERMANENT EASEMENT BY TRANSCANADA
PIPELINES LIMITED
Contract Extension for Legal Services. Authorization to extend the contract
with WeirFoulds LLP for legal services regarding the acquisition of a
permanent easement from TRCA by TransCanada Pipelines Limited in the
Nashville Conservation Reserve.
Moved by: Mike Mattos
Seconded by: Michael Di Biase
THAT the contract previously awarded to WeirFoulds LLP for legal services for acquisition
of a permanent easement from Toronto and Region Conservation Authority (TRCA) by
TransCanada Pipelines Limited be extended by a total cost not to exceed $40,000.00 plus
HST, bringing the total contract value to $60,000.00 plus HST.
CARRIED
BACKGROUND
TRCA is currently finalizing negotiations with TransCanada Pipelines Limited (TCPL) in
accordance with a notice received pursuant to Section 87(1) of the National Energy Board Act
(NEBA). TCPL is federally regulated pursuant to the NEBA and is not subject to Ontario
expropriation procedures. Initial compensation negotiations were interrupted by a Section 104
order being issued by the National Energy Board allowing TCPL access to the required TRCA
easement lands and extending negotiation timelines and associated legal costs. There are
procedures available under Section 104 of the NEBA that permit the compulsory acquisition of
land interests required for the Vaughan Mainline Expansion Pipeline Project, with compensation
determined separately pursuant to the negotiation and arbitration processes described in Section
88 to 103 of the NEBA. Section 99(1) provides for all legal, appraisal and other costs determined
to have been reasonably incurred to be paid by TCPL.
RATIONALE
WeirFoulds LLP is generally recognized as an industry leader on expropriation and National
Energy Board proceedings and regulations. The firm was assigned the file originally due to its
expertise and that of Sean G. Foran who holds extensive experience as counsel in expropriation
and large-scale infrastructure projects. He is a past president and current director of the Ontario
Expropriation Association.
Negotiations have been extended due to a section 104 order having been issued by the National
Energy Board, allowing TCPL access to the required TRCA easement lands for construction. This
order allows for an arbitration process to determine compensation and standardizes contract and
easement language. Both parties have agreed to forego arbitration at this point and continue to
negotiate contract and easement language. TCPL's current requirements differ from past
precedents and therefore require additional legal review and advisory. Contract and easement
terms and conditions are being negotiated in good faith by both parties.
Therefore, staff recommend that contract with WeirFoulds LLP be extended to provide legal
services in relation to the acquisition of a permanent easement from TRCA by TransCanada
Pipelines Limited on a preferred source basis as per Section 9.3.3 of TRCA's Purchasing Policy
as follows:
The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably provided
by any other supplier.
126
FINANCIAL DETAILS
The upset amount of $60,000 is based on an estimate prepared by WierFoulds LLP. Funds are
fully recoverable from TransCanada Pipelines Limited following the resolution of negotiations.
Report prepared by: Stella Ku, extension 5317
Emails: sku cDtrca.on.ca
For Information contact: Jae Truesdell, extension 5247
Emails: ]truesdell(a)trca.on.ca
Date: March 24, 2017
127
Section IV — Ontario Regulation 166/06, As Amended
RES.#B29/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION
166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines and
Watercourses. Pursuant to Ontario Regulation 166/06, as amended, written
permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a river,
creek, stream or watercourse, or for changing or interfering in any way with a wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or
pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Vincent Crisanti
Seconded by: Glenn De Baeremaeker
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications (10.1 — 10.15, inclusive) which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.15 ARE MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that
cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the
landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail
construction.
CITY OF BRAMPTON
fi[]fit[tI:LY�L�ri�L�Z�]�77:g19
To construct, reconstruct, erector place a building or structure on Lot 100, Plan 717, (10
Hazelwood Drive), in the City of Brampton, Etobicoke Creek Watershed. The purpose is to
recognize the construction of a 25 sq. m carport, 9 sq. m gazebo, two pergolas (9 sq. m and
37.6 sq. m) and a shed within TRCA's Regulated Area of the Etobicoke Creek Watershed. The
described works were initiated without issuance of a TRCA permit. As such, an additional
permit application fee of 100% was charged to the application for this "after -the -fact" permit.
CFN: 57495 - Application #: 0268/17/BRAM
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: March 24, 2017
128
CITY OF MARKHAM
10.2 4370 ELGIN MILLS ROAD EAST
To construct, reconstruct, erect or place a building or structure on Lot 26, Concession 5, (4370
Elgin Mills Road East), in the City of Markham, Rouge River Watershed. The purpose is to
undertake works within TRCA's Regulated Area of the Rouge River Watershed to facilitate the
reconstruction of an existing detached garage (approximately 12.67m x 6.49m in size),
associated with a municipal building permit.
CFN: 55406 - Application #: 0145/16/MARK
Report Prepared by: Jeffrey Thompson 5386 jthompson@trca.on.ca
For information contact: Quentin Hanchard 5324 ghanchard@trca.on.ca
Date: March 16, 2017
CITY OF MISSISSAUGA
10.3 3151 CHURCHILL AVENUE
To construct, reconstruct, erect or place a building or structure on Lot 164, Plan 436, (3151
Churchill Avenue), in the City of Mississauga, Mimico Creek Watershed. The purpose is to
undertake works within TRCA's Regulated Area of the Mimico Creek Watershed in order to
facilitate the construction of a 212.4 sq. m (2,286.2 sq. ft) replacement dwelling associated with
a municipal building permit.
CFN: 57352 - Application #: 0136/17/MISS
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: March 24, 2017
CITY OF PICKERING
10.4 1559 MARSHCOURT DRIVE
To construct, reconstruct, erect or place a building or structure on Lot 217, Plan 40M-1499,
(1559 Marshcourt Drive), in the City of Pickering, Duffins Creek Watershed. The purpose is to
acknowledge the construction of a basement walk -out entrance to the rear of the existing single
family detached dwelling at 1559 Marshcourt Drive in the City of Pickering. The basement
walkout was constructed without the benefit of TRCA and/or municipal permit approval. New
concrete steps and a short wall along the extent of the walk -out entrance are also part of this
proposal and will be constructed after permit approval has been granted.
CFN: 57403 - Application #: 0178/17/PICK
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: March 27, 2017
129
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
10.5 MANDRAKE PROPERTIES INC.
To construct, reconstruct, erect or place a building or structure, change a building or structure
so that it alters its use or potential use, increases its size or increases the number of dwelling
units, site grade and temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere on Lot 5, Concession 2 EYS, (411 Lawrence Avenue East),
in the City of Toronto (North York Community Council Area), Don River Watershed as located
on the property owned by Mandrake Properties Inc.. The purpose is to construct additions and
demolish existing buildings in order to accommodate a new gymnasium and cafeteria at
Crestwood School located at 411 Lawrence Avenue East in the City of Toronto (North York
Community Council Area).
CFN: 57463 - Application #: 0236/17/TOR
Report Prepared by: Jessica Bester 5250 jbester@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: March 27, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10.6 3 FENWOOD HEIGHTS
To construct, reconstruct, erect or place a building or structure, site grade and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on Lot 60,
Plan 3757, (3 Fenwood Heights), in the City of Toronto (Scarborough Community Council Area),
Waterfront Watershed. The purpose is to construct a replacement pool shed at the rear of the
existing single family dwelling at 3 Fenwood Heights in the City of Toronto (Scarborough
Community Council Area). A portion of the works were constructed without TRCA or Municipal
permits. As such, the applicant has paid double the application fee as required for a permit
"after -the -fact" in association with the violation of Ontario Regulation 166/06.
CFN: 56799 - Application #: 1136/16/TOR
Report Prepared by: Anna Lim 5284 alim@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: February 28, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10.7 65 SYLVAN AVENUE
To construct, reconstruct, erect or place a building or structure, site grade and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on Lot 79,
Plan 4351, (65 Sylvan Avenue), in the City of Toronto (Scarborough Community Council Area),
Waterfront Watershed. The purpose is to acknowledge the replacement of pool pavers and
minor landscaping at the rear of the existing single family detached dwelling at 65 Sylvan
Avenue in the City of Toronto (Scarborough Community Council Area). A portion of the works
were constructed without TRCA or Municipal permits. As such, the applicant has paid double
the application fee as required for a permit "after -the -fact' in association with the violation of
Ontario Regulation 166/06, as amended.
130
CFN: 57206 - Application #: 0089/17/TOR
Report Prepared by: Anna Lim 5284 alim@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: March 24, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
10.8 MAGNUM OPUS (PINE) CORPORATION
To construct, reconstruct, erect or place a building or structure on Part Lot 98, Plan M-390, (56
Pine Crescent), in the City of Toronto (Toronto and East York Community Council Area), Don
River Watershed as located on the property owned by Magnum Opus (Pine) Corporation. The
purpose is to acknowledge the reconstruction of the detached garage located to the rear of the
existing single family dwelling at 56 Pine Crescent in the City of Toronto (Toronto and East
York). The garage has been partially reconstructed without TRCA and/or municipal permit
approval.
CFN: 57386 - Application #: 0155/17/TOR
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: February 27, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
10.9 TALUS CAPITAL (EASTERN AVENUE) LIMITED
To construct, reconstruct, erect or place a building or structure and site grade on Lot 147, Plan
105, (356 Eastern Avenue), in the City of Toronto (Toronto and East York Community Council
Area), Don River Watershed as located on the property owned by Talus Capital (Eastern
Avenue) Limited. The purpose is to acknowledge the construction of eighteen storage
containers to the rear of the existing commercial building at 356 Eastern Avenue in the City of
Toronto (Toronto and East York).
CFN: 57398 - Application #: 0168/17/TOR
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: March 27, 2017
CITY OF VAUGHAN
10.10 28 GENTILE CIRCLE
To construct, reconstruct, erect or place a building or structure and temporarily or permanently
place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 4230,
(28 Gentile Circle), in the City of Vaughan, Humber River Watershed. The purpose is to
recognize the construction of a 23 sq. m. (247.66 sq. ft.) deck located at the rear of an existing
single detached dwelling within a Regulated Area of the Humber River Watershed. The
described works were carried out without TRCA or municipal building permits. As such, the
applicant has paid double the permit application fee amount associated with an "after -the -fact'
permit. The subject property is located at 28 Gentile Court, in the City of Vaughan.
131
CFN: 57445 - Application #: 0211117/VAUG
Report Prepared by: Stephen Bohan 5743 sbohan@trca.on.ca
For information contact: Jackie Burkart 5304 jburkart@trca.on.ca
Date: March 17, 2017
CITY OF VAUGHAN
10.11 NASHVILLE DEVELOPMENTS INC.
To construct, reconstruct, erect or place a building or structure, site grade and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on Lot 21,
22, 23, 24, 25, Concession 9, (northeast of Major Mackenzie Drive and Huntington Road), in the
City of Vaughan, Humber River Watershed as located on the property owned by Nashville
Developments Inc. The purpose is to allow development within a Regulated Area of the Humber
River Watershed to facilitate the construction of a pedestrian trail in a draft approved plan of
subdivision (19T -10V004) within Block 61 West, northeast of Major Mackenzie Drive and
Huntington Road, in the City of Vaughan.
CFN: 57519 - Application #: 0345117/VAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: March 28, 2017
CITY OF VAUGHAN
10.12 63 ROSEBURY LANE
To construct, reconstruct, erect or place a building or structure and temporarily or permanently
place, dump or remove any material, originating on the site or elsewhere on Lot 20, Plan
M2165, (63 Rosebury Lane), in the City of Vaughan, Humber River Watershed. The purpose is
to facilitate development in a Regulated Area of the Humber River Watershed to maintain a rear
deck approximately 4m (13'-5") deep, 6.9m (22'-9") wide, and with a total area of approximately
27.6 sq. m. ( 307sq. ft.) constructed without TRCA approvals. The applicant has paid double the
application fee as required for voluntary compliance related to resolution of a violation of Ontario
Regulation 166/06. The subject property is located on lands known municipally as 63 Rosebury
Lane, in the City of Vaughan.
CFN: 57396 - Application #: 0161117/VAUG
Report Prepared by: Anthony Syhlonyk 5272 asyhlonyk@trca.on.ca
For information contact: June Little 5756 jlittle@trca.on.ca
Date: March 27, 2017
132
CITY OF VAUGHAN
10.13 30 GENTILE CIRCLE
To construct, reconstruct, erect or place a building or structure and temporarily or permanently
place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 4230,
(30 Gentile Circle), in the City of Vaughan, Humber River Watershed. The purpose is to
recognize the construction of a 23 sq. m. (247.66 sq. ft.) deck located at the rear of an existing
single detached dwelling within a Regulated Area of the Humber River Watershed. The
described works were carried out without TRCA or municipal building permits. As such, the
applicant has paid double the permit application fee amount associated with an "after -the -fact'
permit. The subject property is located at 30 Gentile Court, in the City of Vaughan.
CFN: 57444 - Application #: 0210/17/VAUG
Report Prepared by: Stephen Bohan 5743 sbohan@trca.on.ca
For information contact: Jackie Burkart 5304 jburkart@trca.on.ca
Date: March 17, 2017
CITY OF VAUGHAN
10.14 77 CLARENCE STREET
To construct, reconstruct, erect or place a building or structure and site grade on Lot 7, Plan 7,
(77 Clarence Street), in the City of Vaughan, Humber River Watershed. The purpose is to
facilitate development in a Regulated Area of the Humber River Watershed subject to the
Woodbridge Special Policy Area (SPA), the construction of a 653.61 sq. m. (7035 sq. ft.)
replacement dwelling on lands known municipally as 77 Clarence Street, in the City of Vaughan.
CFN: 57502 - Application #: 0285/17/VAUG
Report Prepared by: Anthony Syhlonyk 5272 asyhlonyk@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: March 28, 2017
TOWN OF CALEDON
10.15 7641 MILL LANE
To construct, reconstruct, erect or place a building or structure on, (7641 Mill Lane), in the Town
of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA
Regulated Area of the Humber River Watershed in order to facilitate the construction of a
driveway associated with a municipal building permit.
CFN: 55598 - Application #: 0246/16/CAL
Report Prepared by: Anant Patel 5618 apate l@trca.on.ca
For information contact: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
Date: March 23, 2017
RES.#B30/17 - STANDARD DELEGATED PERMITS
Moved by: Vincent Crisanti
Seconded by: Glenn De Baeremaeker
133
THAT standard delegated permits, permission for routine infrastructure works, and minor works
letter of approval granted by Toronto and Region Conservation Authority staff, in accordance
with Ontario Regulation 166/06, as amended, which are listed below, be received.
CARRIED
10.16 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. Standard Permits , including Emergency Infrastructure
Works permissions, are subject to the authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency infrastructure works are non-complex
permissions consistent with TRCA approved policies and procedures and issued for a time period of two years of less.
CITY OF BRAMPTON
CITY OF BRAMPTON - Etobicoke Creek Watershed
The purpose is to pave the existing gravel parking lot at 129 Glidden Road in the City of Brampton with
an asphalt surface. The warm water construction timing window will be applied to this project.
CFN: 55523 - Application M 0334/16/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: March 20, 2017
CITY OF MARKHAM
2404193 ONTARIO INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in
order to facilitate the relocation of a 122.6 sq.m (1,320 sq.ft) existing heritage house to the subject
property. The works also include construction of a 54.8 sq.m (590 sq.ft) attached garage and 265.7
sq.m (2,880 sq.ft) addition to the existing structure. The works are associated with a municipal Site Plan
application (Town File: SC 16 126600), Consent Application (Town File: B/27/14) and building permit.
CFN: 57208 - Application #: 0092/17/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 15, 2017
42 EAST DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in
order to facilitate the construction of a 246.19 square metre (2,650 square foot) replacement dwelling
associated with a municipal Site Plan application (Town File: SC 16 169322) and building permit.
CFN: 56635 - Application #: 1164/16/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 17, 2017
134
FIRST MARKHAM PROPERTIES INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in
order to facilitate the removal of an existing retaining wall and reconstructing a new wall a distance of
approximately 5.9 metres to the south-west associated with municipal approvals..
CFN: 57385 - Application #: 0153/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 16, 2017
KYLEMORE COMMUNITIES (YORKTON) LTD. - Rouge River Watershed
The purpose is to conduct site grading and construct an interim stormwater management pond within a
Regulated Area of the Rouge River watershed near the northwest corner of 16th Avenue and Kennedy
Road in the City of Markham.
CFN: 56881 - Application #: 1186/16/MARK
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Anthony Sun, extension 5724, email asun@trca.on.ca
Date: March 23, 2017
CITY OF PICKERING
1935 SPRUCE HILL ROAD - Petticoat Creek Watershed
The purpose is to construct a new two-storey single family detached dwelling with a deck to the rear at
1935 Spruce Hill Road in the City of Pickering.
CFN: 57123 - Application #: 0041/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 27, 2017
NORTH PICKERING COMMUNITY MANAGEMENT INC. - Duffins Creek Watershed
The purpose is to construct a new 750 mm diameter concrete sanitary trunk sewer along future
proposed Silvermoon Drive and Cinnabar Street (generally located west of Sideline 26 and south of
Whitevale Road) as part of the Seaton servicing work.
CFN: 56851 - Application #: 0190/17/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: March 27, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
33 NORTH DRIVE - Humber River Watershed
The purpose is to construct a new two storey single family detached dwelling with integral garage at 33
North Drive in the City of Toronto (Etobicoke York Community Council Area). The proposal also
includes a rear patio, pool, and pool cabanas.
135
CFN: 56876 - Application #: 1173/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 23, 2017
290 RIVERSIDE DRIVE - Humber River Watershed
The purpose is to construct a rear addition to the existing single family dwelling at 290 Riverside Drive
in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57015 - Application #: 1243/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 27, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to carry out emergency repairs on exposed sections of sanitary sewer in Berry Creek at
Snaresbrook Park and The Elms Park, located between Kipling Avenue and east of Islington Avenue,
south of Elmhurst Drive. Works will involve reinforcement of the exposed sections of sewer, followed by
restoration of the sites. This permit was issued in accordance with TRCA's Permission for Emergency
Infrastructure Works Review Protocol (Authority Res. #A105/15). The warm water construction timing
window of July 1 to March 31 will apply to this proposal.
CFN: 56795 - Application #: 0079/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: February 16, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to undertake emergency repairs and strengthening of existing twin corrugated steel pipe
(CSP) culverts that are failing and deteriorated located on Jane Street over the Black Creek near
Giltspur Drive and Troutbrooke Drive in Toronto. The existing twin CSPs are showing signs of eminent
failure. This permit was issued in accordance with TRCA's Permission for Emergency Infrastructure
Works Review Protocol (Authority Res. #A105/15). The warm water construction timing window of July
1 to March 31 will apply to this proposal.
CFN: 57267 - Application #: 0081/17/TOR
Report Prepared by: Renee Afoom-Boateng, extension 5714, email rafoom-boateng@trca.on.ca
For information contact: Renee Afoom-Boateng, extension 5714, email rafoom-
boateng@trca.on.ca
Date: February 22, 2017
DENNIS AND NICOLE MELNBARDIS - Humber River Watershed
The purpose is to construct a loggia at the rear of the existing dwelling at 425 The Kingsway in the City
of Toronto (Etobicoke York). The existing in -ground pool is to be relocated in order to accommodate the
proposed loggia addition. A proposed pool equipment/change room structure is also proposed.
136
CFN: 57103 - Application #: 1289/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 2, 2017
111 TREELAWN PARKWAY - Humber River Watershed
The purpose is to construct a new two-storey single family detached dwelling at 111 Treelawn Parkway
in the City of Toronto (Etobicoke York). The existing dwelling is to be demolished.
CFN: 55494 - Application #: 0219/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 2, 2017
27 GRENADIER HEIGHTS - Humber River Watershed
The purpose is to construct a partial third storey addition and deck to the existing single family
detached dwelling at 27 Grenadier Heights in the City of Toronto. The existing building footprint is to
remain unchanged. Also included in this proposal are the replacement and repair of existing retaining
walls, stairs, and at grade patios in the rear yard.
CFN: 56282 - Application #: 0862/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 9, 2017
4 SAVALON COURT - Mimico Creek Watershed
The purpose is to construct a one storey rear addition to the existing two storey single family dwelling at
4 Savalon Court in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57511 - Application #: 0267/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 9, 2017
60 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a detached garage in the rear yard of the existing dwelling at 60 Cynthia
Road in the City of Toronto (Etobicoke York). The scope of these works include the reconstruction of an
existing front verandah with cold storage below.
CFN: 56380 - Application #: 0944/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 9, 2017
137
83 MONTERREY DRIVE - Humber River Watershed
The purpose is to construct a second storey addition, one storey rear addition and two storey side
addition to the existing single storey detached dwelling at 83 Monterrey Drive in the City of Toronto
(Etobicoke York Community Council Area). This proposal also includes a rear deck and front porch.
CFN: 56891 - Application #: 1200/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 15, 2017
96 MONTGOMERY ROAD - Mimico Creek Watershed
The purpose is to construct a new two-storey single family detached dwelling and integral garage at 96
Montgomery Road in the City of Toronto (Etobicoke York).
CFN: 56374 - Application #: 0870/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 21, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
2150704 ONTARIO INC. - Don River Watershed
The purpose is to construct a sports court, storage cabana, patio and associated landscaping at 51
Highland Crescent in the City of Toronto (North York Community Council Area).
CFN: 56454 - Application #: 0898/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 17, 2017
CITY OF TORONTO - Don River Watershed
The purpose is to replace a failing retaining wall between 76 and 78 Olsen Drive, near Don Mills Road
and Graydon Hall Drive. Works will involve demolition and replacement of the existing retaining wall,
followed by restoration of the site. No in -water works are within the scope of this project.
CFN: 56794 - Application #: 0035117/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: February 27, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to repair a damaged storm sewer at the intersection of Chesham Drive and Forthbridge
Crescent, near Jane Street and Wilson Avenue. Works will involve removal and replacement of the
damaged segment of sewer, followed by restoration of the site. The warm water construction timing
window of July 1 to March 31 will apply to this proposal.
138
CFN: 57269 - Application #: 0222/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: March 6, 2017
126 SANDRINGHAM DRIVE - Don River Watershed
The purpose is to construct a two-storey replacement dwelling with in -ground swimming pool, spa,
cabana and associated landscaping at 126 Sandringham Drive in Toronto (North York Community
Council Area).
CFN: 56475 - Application #: 0921/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 16, 2017
THE DONALDA CLUB - Don River Watershed
The purpose is to regrade the riverbank and install a vegetated stone revetment in the vicinity of the
18th Hole and bio -engineer a portion of riverbank adjacent to the 5th Hole for the purpose of bank
stabilization.
CFN: 56889 - Application #: 1198/16/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 24, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
7 REDLAND CRESCENT EAST - Waterfront Watershed
The purpose is to a construct a two-storey replacement dwelling with rear concrete deck and
associated landscaping at 7 Redland Crescent East in Toronto (Scarborough Community Council
Area).
CFN: 54812 - Application #: 1045/15/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 17, 2017
12 EAGLEWING COURT - Highland Creek Watershed
The purpose is to construct a new sunroom addition with roof deck to the rear of the existing two-storey
detached dwelling at 12 Eaglewing Court in the City of Toronto, (Scarborough Community Council
Area).
CFN: 57382 - Application M 0151/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 8, 2017
139
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
584 EASTERN AVENUE - Don River Watershed
The purpose is to underpin the basement of the existing semi-detached single family dwelling at 584
Eastern Avenue in the City of Toronto (Toronto and East York).
CFN: 56565 - Application #: 1064/16/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 27, 2017
44 FOUR OAKS GATE - Don River Watershed
The purpose is to construct a pool in the rear yard of the existing single family detached dwelling at 44
Four Oaks Gate in the City of Toronto (Toronto and East York).
CFN: 56810 - Application #: 1157/16/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 3, 2017
122 GLENWOOD CRESCENT - Don River Watershed
The purpose is to construct a second storey addition to the existing single family detached dwelling at
122 Glenwood Crescent in the City of Toronto (Toronto and East York Community Council Area).
CFN: 57585 - Application #: 0308/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 28, 2017
CITY OF VAUGHAN
CITY OF VAUGHAN - Humber River Watershed
The purpose is to replace a 1000mm diameter by 23600mm length CSP culvert that conveys a tributary
of the Humber River under King -Vaughan Road with a larger box culvert. Associated works include a
boulder plunge pool downstream of the culvert and in -stream round stone upstream and downstream of
the culvert, a stone lined ditch along the south road embankment, and armour stone head walls at the
culvert inlet and outlet. The warm water construction timing window will apply to this project.
CFN: 55526 - Application #: 0348/16/VAUG
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: March 15, 2017
140
CITY OF VAUGHAN - Don River Watershed
The purpose is to undertake replacement of a pedestrian bridge crossing the Don River within Marita
Payne Park, east of Cherry Hill Road, west of Dufferin Street. The existing bridge will be removed and
replaced with a new self weathering steel bridge on existing abutments. The works will also include
upgrade to the approach pathways on either side of the bridge with light duty asphalt paving.
CFN: 56056 - Application M 0640/16NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email hgammanpila@trca.on.ca
Date: February 28, 2016
HOUSING YORK INC. - Humber River Watershed
The purpose is to facilitate, in a Regulated Area of the Humber River Watershed, the development of a
six storey mixed-use building containing 160 affordable housing units, 322 sq. m. (3465.98 sq. ft.) of
ground floor commercial space, and 195 (26 surface, 169 internal) parking spaces. The subject
properties are known municipally as 259 Woodbridge Avenue, 275 Woodbridge Avenue, and 6 Abell
Avenue, in the City of Vaughan.
CFN: 57392 - Application M 0159/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 10, 2017
217 CENTRE STREET - Don River Watershed
The purpose is to facilitate, in the TRCA's Regulated Area of the Don River Watershed, the
development of a 2 storey 434.96 sq. m. (4682sq. ft.) single residential dwelling.
CFN: 57424 - Application M 0208/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 23, 2017
TORONTO WALDORF SCHOOL - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed in order
to facilitate repair and resurfacing works to an existing bridge located on the property at 9100 Bathurst
Street in the City of Vaughan.
CFN: 56819 - Application M 1302/16/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 28, 2017
141
TOWN OF CALEDON
555 KING STREET EAST - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in
order to facilitate the construction of a 215 sq.m (2,314.2 sq.ft) replacement dwelling and 264 sq.m
(2,841.4 sq.ft) replacement septic system associated with a municipal Minor Variance (Town File:
A037-16) and building permit application.
CFN: 57232 - Application #: 0078/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 15, 2017
MATTAMY CORPORATION - Etobicoke Creek Watershed
The purpose is to site grade, place fill and construct servicing infrastructure within the Regulated Area
of the Etobicoke Creek Watershed to facilitate the development of a residential draft plan of subdivision.
CFN: 55960 - Application #: 0516116/CAL
Report Prepared by: Leilani Lee -Yates, extension 5370, email Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates, extension 5370, email Ilee-yates@trca.on.ca
Date: May 27, 2016
TOWN OF RICHMOND HILL
60 SKYWOOD DRIVE - Rouge River Watershed
The purpose is to undertake works within the TRCA's Regulated Area of the Rouge River Watershed in
order to facilitate the construction of a swimming pool approximately 37.90 square metres (408 square
feet) in size and a concrete pool deck, to be located at the rear of an existing dwelling..
CFN: 56221 - Application #: 0744116/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 22, 2017
LESLIE ELGIN DEVELOPMENTS INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in
order to facilitate the construction of a temporary sales trailer compound consisting of 4 sales centres,
each 320m2 in size. The proposed works include a parking area for approximately 75 vehicles, overflow
staff parking, landscaping, access to Leslie Street and the future extension of John Birchall Road, and
associated grading.
CFN: 57021 - Application #: 1253/16/RH
Report Prepared by: Doris Cheng, extension 5306, email dcheng@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: December 9, 2016
142
TORONTO MUSLIM CEMETERY CORP. - Rouge River Watershed
The purpose is to conduct minor grading works associated with the construction of a driveway within a
Regulated Area of the Rouge River watershed at 13076 Leslie Street in the Town of Richmond Hill.
CFN: 51549 - Application #: 0652/14/RH
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Anthony Sun, extension 5724, email asun@trca.on.ca
Date: March 2, 2017
TOWNSHIP OF KING
89 BURTON GROVE - Humber River Watershed
The purpose is to facilitate, within the TRCA's Regulated Area of a Provincially Significant Wetland
within the Humber River Watershed, the construction of an approximately 41.6sq. m. (447.77 sq. ft.)
auxiliary building for use as a pool house adjacent to an in ground pool built in Summer 2016. The
subject property is known municipally as 89 Burton Grove, Township of King.
CFN: 57443 - Application #: 0198/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: February 21, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency Infrastructure Works permissions are
subject to authorization by staff designated as Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively.
All routine and emergency infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard
or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the
conservation of land.
CITY OF BRAMPTON
REGIONAL MUNICIPALITY OF PEEL
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Aintree Crescent, west of Bramalea Road and south of Balmoral Drive, in the City of Brampton,
Etobicoke Creek Watershed as located on property owned by the City of Brampton. The purpose is to
replace an existing 150 mm diameter watermain and an existing 200 mm diameter sanitary sewer on
Aintree Crescent, west of Bramalea Road and south of Balmoral Drive, in the City of Brampton. No in -
water works are associated with this project.
CFN: 56823 - Application #: 0007/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: February 28, 2017
143
REGIONAL MUNICIPALITY OF PEEL
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Moore Crescent, east of Mary Street, in the City of Brampton, Etobicoke Creek Watershed as located
on property owned by the City of Brampton. The purpose is to replace an existing 40 mm diameter
watermain and an existing 200 mm diameter sanitary sewer on Moore Crescent, east of Mary Street, in
the City of Brampton. No in -water works are associated with this project.
CFN: 56824 - Application M 0009/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: February 28, 2017
CITY OF MARKHAM
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on the
north side of Highway 7, west of Kennedy Road, in the City of Markham, Rouge River Watershed as
located on property owned by the City of Markham, under franchise agreement with Enbridge Gas
Distribution Inc. The purpose is to install a NPS 6 ST DFBE IP gas main. No in -water works are
associated with this project.
CFN: 56847 - Application #: 0188/17/MARK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: March 10, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Lakeshore Drive, Morrison Street, Second Street and Fourth Street, near Lakeshore Boulevard West
and Second Street, in the City of Toronto (Etobicoke York Community Council Area), Waterfront
Watershed, as located on property owned by the City of Toronto. The purpose is to place conduit. No
in -water works are within the scope of this project.
CFN: 56907 - Application M 1284/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 1, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Eglinton Avenue West, from Russell Road
to Royal York Road and from Scarlett Road to Weston Road, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed as located on property owned by the City of
Toronto. The purpose is to undertake road resurfacing, undertake road shoulder rehabilitation and
replace and install new sidewalks. No in -water work is within the scope of this project.
144
CFN: 56773 - Application #: 1233/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 10, 2017
CITY OF TORONTO
To undertake structure maintenance on the bridge carrying Bloor Street West over the Etobicoke
Creek, near Fieldgate Drive and Mill Road, in the City of Toronto (Etobicoke York Community Council
Area), Etobicoke Creek Watershed, as located on the property owned by the City of Toronto and City of
Mississauga. The purpose is to rehabilitate an existing bridge structure. Works will involve repair to
various bridge elements. No in -water works are within the scope of this project.
CFN: 56792 - Application #: 0011/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: February 21, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within the right-of-way of Attwell
Drive, Disco Road and 120 and 150 Disco Road in the City of Toronto (Etobicoke York Community
Council Area), Mimico Creek Watershed as located on property owned by the City of Toronto. The
purpose is to construct an active landfill gas venting system. No in -water work is within the scope of this
project.
CFN: 56868 - Application #: 1220/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 10, 2017
CITY OF TORONTO
To undertake structure maintenance on the Dundas Street West and Islington Avenue bridge over
Mimico Creek, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek
Watershed as located on property owned by the City of Toronto. The purpose is to undertake bridge
repairs. No in -water work is within the scope of this project.
CFN: 57158 - Application #: 0067/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 10, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Jethro Road, Leggett Avenue, Teston Boulevard and Scarlett Road, in the City of Toronto (Etobicoke
York Community Council Area), Humber River Watershed as located on property owned by City of
Toronto. The purpose is to undertake replacement and upgrade of watermains. No in -water work is
within the scope of this project.
145
CFN: 57171 - Application #: 0122/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 7, 2017
TORONTO TRANSIT COMMISSION
To undertake road/pathway resurfacing or reconstruction of the streetcar track between the east and
westbound Queensway, from approximately Claude Avenue to the Humber Bus Loop Station, in the
City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on the
property owned by Toronto Transit Commission and City of Toronto. The purpose is to rehabilitate and
reconstruct The Queensway track to service the existing Street Car System. No in -water works are
associated with this project.
CFN: 56651 - Application #: 1197/16/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: March 1, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
TORONTO HYDRO -ELECTRIC SYSTEM LIMITED
To undertake sewer and watermain or utility installation or maintenance within an existing roadway on
Bayview Avenue from north of Kilgour Road to north of Sunnydene Crescent, near Bayview Avenue
and Eglinton Avenue East, in the City of Toronto (North York Community Council Area), Don River
Watershed as located on property owned by the City of Toronto. The purpose is to supply Toronto
Sunnybrook Regional Hospital with new supply feeder. No in -water work is within the scope of this
project.
CFN: 56905 - Application M 1267/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 21, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Rouge Hills Drive, Island Road, Taylor Road and West Point Avenue, near Kingston Road and Port
Union Road, in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed,
as located on property owned by the City of Toronto. The purpose is to place conduit and new grade
level boxes. No in -water works are within the scope of this project.
CFN: 56898 - Application #: 1215/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 1, 2017
146
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Galloway Road and Weir Crescent, near the intersection of Kingston Road and Lawrence Avenue East,
in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located
on property owned by the City of Toronto. The purpose is to place conduit and grade level box. No in -
water work is within the scope of this project.
CFN: 57330 - Application #: 0185117/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: February 22, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Zaph
Avenue, Maplelea Road, Euclid Avenue, near Ellesmere Road and Meadowvale Road, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install conduit. No in -water work is within the scope of
this project.
CFN: 57333 - Application #: 0201/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 22, 2017
CITY OF TORONTO
To undertake structure maintenance on the Steeles Avenue East bridge over Little Rouge River,
located east of Reesor Road, in the City of Toronto (Scarborough Community Council Area), Rouge
River Watershed as located on property owned by the City of Toronto. The purpose is to undertake
bridge repairs. No in -water work is within the scope of this project.
CFN: 57157 - Application #: 0071/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 10, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Sheppard Avenue East, east of Kennedy Road, in the City of Toronto (Scarborough Community
Council Area), Highland Creek Watershed as located on property owned by the City of Toronto. The
purpose is to install conduit and a manhole. No in -water work is within the scope of this project.
CFN: 57334 - Application #: 0204/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 10, 2017
147
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
BELLCANADA
To undertake sewer and watermain or utility installation or maintenance within an existing roadway on
Nesbitt Drive and True Davidson Drive, near Bayview Avenue and Moore Avenue, in the City of
Toronto (Toronto and East York Community Council Area), Don River Watershed, as located on
property owned by the City of Toronto. The purpose is to undertake telephone service upgrades.
Works will involve removal and replacement of the existing telephone conduits. No in -water works are
within the scope of this project.
CFN: 56299 - Application #: 0775/16/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: March 10, 2017
BELLCANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
Halsey Avenue, near the intersection of St. Clair Avenue East and Victoria Park Avenue, in the City of
Toronto (Toronto and East York Community Council Area), Don River Watershed as located on
property owned by the City of Toronto. The purpose is to install conduit and grade level boxes. No in -
water work is within the scope of this project.
CFN: 57159 - Application #: 0072117/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 1, 2017
CITY OF VAUGHAN
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility pole installation or maintenance within an existing roadway on
Jane Street; Peelar Road; Maplecrete Road, in the City of Vaughan, Humber River Watershed as
located on the property owned by the Regional Municipality of York and the City of Vaughan. The
purpose is to undertake routine infrastructure works including the installation of twenty-one new hydro
poles and removal of nineteen existing hydro poles within the road right-of-way of Jane Street, Peelar
Road and Maplecrete Road in the Regional Municipality of York and the City of Vaughan.
CFN: 56831 - Application #: 0028/17/VAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: March 27, 2017
MR
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing roadway on
the north side of Bayly Street East, north of Boone Lane, in the Town of Ajax, Carruthers Creek
Watershed as located on the property owned by the Regional Municipality of Durham, under franchise
agreement with Enbridge Gas Distribution Inc. The purpose is to install a cathodic protection rectifier
pole and accompanying anode header cable. No in -water works are associated with this project.
CFN: 56841 - Application #: 0126/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: March 9, 2017
TOWN OF CALEDON
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the north
side of Old Church Road and east of Mount Pleasant Road, in the Town of Caledon, Humber River
Watershed as located on property owned by the Town of Caledon under franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline. No in -water works
are within the scope of this project.
CFN: 56840 - Application #: 0125/17/CAL
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: February 28, 2017
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on
11108 Yonge Street, in the Town of Richmond Hill, Rouge River Watershed as located on property
owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service. The
purpose is to install a NPS 2 PE IP header service. No in -water works are within the scope of this
project.
CFN: 55927 - Application #: 0248/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: March 24, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway on the
west side of Yonge Street, north and south of Brookside Road, in the Town of Richmond Hill, Rouge
River Watershed as located on the property owned by the Regional Municipality of York, under
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 6 PE IP gas
pipeline. No in -water works are associated with this project.
149
CFN: 55928 - Application #: 0249/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: March 24, 2017
POWERSTREAM INC.
To construct, reconstruct, erect or place a building or structure on Bloomington Road from east of the
CN Railway Track to Highway 404, in the Town of Richmond Hill, Rouge River Watershed as located
on the property owned by the Regional Municipality of York. The purpose is to undertake installation of
an underground duct bank within the right -of way of Bloomington Road from east of the CN Rail Track
to Highway 404..
CFN: 57038 - Application #: 1279/16/RH
Report Prepared by: Antonietta Gentile, extension 5796, email agentile@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: March 22, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received
monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and
Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the
conservation of land.
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
347 MARKLAND DRIVE
To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 126, Plan M-944, (347 Markland
Drive), in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 57494 - Application #: 0266/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 10, 2017
51 EDENBROOK HILL
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory structure up to 50
sq. m (538 sq. ft) on Lot 29, Plan 5773 -YORK, (51 Edenbrook Hill), in the City of Toronto (Etobicoke
York Community Council Area), Humber River Watershed.
CFN: 56914 - Application #: 1205/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 24, 2017
150
387 MARKLAND DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground
floor addition up to 50 sq. m (538 sq. ft) on Lot 153, Plan M-944, (387 Markland Drive), in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 57471 - Application #: 0245/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 7, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
310 RIVERVIEW DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) on Part 76 Lot 77, 78, Plan M-275, (310 Riverview Drive),
in the City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 57436 - Application #: 0213/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 27, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
3 REDLAND CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory structure up to 50
sq. m (538 sq. ft) on Lot 24, 25, Plan M350, (3 Redland Crescent), in the City of Toronto (Scarborough
Community Council Area), Waterfront Watershed.
CFN: 57458 - Application M 0232117/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 6, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
528 EASTERN AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory structure up to 50
sq. m (538 sq. ft) on Part Lot 4, Plan 354, (528 Eastern Avenue), in the City of Toronto (Toronto and
East York Community Council Area), Don River Watershed.
CFN: 57500 - Application M 0280/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 22, 2017
151
CITY OF VAUGHAN
15 SALAMANDER COURT
To install a swimming pool on Lot 234, Plan 65M-3878, (15 Salamander Court), in the City of Vaughan,
Don River Watershed.
CFN: 55998 - Application #: 0545/16NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 17, 2017
183 TWIN HILLS CRESCENT
To install a swimming pool and undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 11, Plan 65M-
4111, (183 Twin Hills Crescent), in the City of Vaughan, Humber River Watershed.
CFN: 57469 - Application #: 0242/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: March 9, 2017
29 MEADOW RIDGE COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 29,
Concession 3 Lot 282, Plan 65M-3878, (29 Meadow Ridge Court), in the City of Vaughan, Don River
Watershed.
CFN: 57464 - Application #: 0235117/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: March 8, 2017
45 DONNA MAE CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) on Lot 32, 33, Plan 9834, (45 Donna Mae Crescent), in the
City of Vaughan, Don River Watershed.
CFN: 57426 - Application #: 0206/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 2, 2017
211 CENTRE STREET
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) on Lot 32, 33, Plan 9834, (211 Centre Street), in the City of
Vaughan, Don River Watershed.
152
CFN: 57423 - Application #: 0209/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 2, 2017
44 DONNA MAE CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of less than
30 cubic metres (equivalent to 3 truckloads) on , (44 Donna Mae Crescent), in the City of Vaughan,
Don River Watershed.
CFN: 57425 - Application #: 0207/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 2, 2017
61 NOAH CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading
of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable
accessory structure up to 50 sq. m (538 sq. ft) on , (61 Noah Crescent), in the City of Vaughan, Humber
River Watershed.
CFN: 57501 - Application #: 0282117/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 28, 2017
TOWN OF CALEDON
42 MATSON DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 58, Plan M-31, (42
Maston Drive), in the Town of Caledon, Humber River Watershed.
CFN: 57492 - Application #: 0264/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 20, 2017
14278 MOUNT PLEASANT ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on East Half Lot 12, 8,
14278 Mount Pleasant Road, in the Town of Caledon, Humber River Watershed.
CFN: 57408 - Application #: 0182/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 20, 2017
153
TOWN OF RICHMOND HILL
45 COLLIN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Block 44, Plan
65M-4316, (45 Collin Court), in the Town of Richmond Hill, Don River Watershed.
CFN: 57022 - Application #: 1254/16/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 22, 2017
29 MEADOWSWEET LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on (29 Meadowsweet
Lane), in the Town of Richmond Hill, Humber River Watershed.
CFN: 57472 - Application #: 0246117/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: March 20, 2017
TOWNSHIP OF KING
116 ROBERT BERRY CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or regrading
of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable
accessory structure up to 50 sq. m (538 sq. ft) on Lot 90, Plan 65M-4342, (116 Robert Berry Crescent),
in the Township of King, Humber River Watershed.
CFN: 57470 - Application #: 0244117/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: March 9, 2017
TERMINATION
ON MOTION, the meeting terminated at 10:27 a.m., on Friday, April 07, 2017.
Maria Augimeri
Chair
/ks
154
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #3/17 was held at TRCA Head Office, on Friday, May 5,
2017. The Chair Maria Augimeri, called the meeting to order at 9:38 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Michael Di Biase
Member
Jennifer Innis
Member
Colleen Jordan
Member
Mike Mattos
Member
ABSENT
Glenn De Baeremaeker Member
Chris Fonseca Member
Jennifer McKelvie Member
Anthony Perruzza Member
RES.#B30/17 - MINUTES
Moved by: Michael Di Blase
Seconded by: Jack Ballinger
THAT the Minutes of Meeting #2/17, held on April 7, 2017, be approved.
CARRIED
DELEGATIONS
4.1. A delegation by Mr. Saeed Ghias, homeowner, in regard to item 7.1 - Request for
Disposal of Toronto and Region Conservation Authority Land, Adjacent to 40 Grovetree
Road.
RES.#B31/17 - DELEGATIONS
Moved by: Jack Heath
Seconded by: Colleen Jordan
THAT above -noted delegation 4.1 be received.
CARRIED
155
Section I — Items for Authority Action
RES.#B32/17 - REQUEST FOR DISPOSAL OF TORONTO AND REGION
CONSERVATION AUTHORITY -OWNED LAND
Adjacent to 40 Grovetree Road, City of Toronto, Humber River Watershed,
CFN 56447. Recommendation that the subject TRCA-owned property,
located to the rear of 40 Grovetree Road, in the City of Toronto, Humber
River watershed, be retained in TRCA ownership for conservation
purposes.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation
Authority (TRCA) owned property located to the rear of 40 Grovetree Road, in the City of
Toronto, be retained in TRCA ownership for conservation purposes.
CARRIED
BACKGROUND
A request by email correspondence was received from Mr. Saied Ghias who wishes to purchase a
0.5 -acre parcel of TRCA-owned property located to the rear of 40 Grovetree Road, in the City of
Toronto.
At Executive Committee Meeting #8/16, held on October 14, 2016, Resolution #B98/16 was
approved as follows:
THAT the potential disposal of a portion of Toronto and Region Conservation Authority
(TRCA) owned property located adjacent to 40 Grovetree Road, in the City of Toronto, be
referred to TRCA staff for review and discussion in accordance with established TRCA
policies;
AND FURTHER THAT a report be brought forward to the Executive Committee at a future
date recommending further action.
The subject TRCA lands are part of a larger parcel acquired from Joseph L. Baril on June 20,
1963, under the Humber River Flood Plain Lands Acquisition Project and are managed by the City
of Toronto under a management agreement.
Mr. Ghias has indicated that his neighbour at 38 Grovetree Road purchased property from TRCA
to increase the backyard area and accordingly, he would also like to purchase TRCA property to
extend his backyard.
The following is a brief history of 38 Grovetree Road. TRCA staff identified an encroachment on
TRCA property behind 38 Grovetree Road in the mid-1970s. The encroachment consisted of a
large retaining wall system, backfilled area to contain an in -ground swimming pool, concrete
landing, steps and terrazzo patio along with a fenced -in area, maintained as lawn. The total area
of encroachment measured 0.05 hectares (0.12 acres). To address this encroachment, TRCA
entered into a License of Occupation Agreement with the owner in 1977.
156
In 1993, the owner submitted a request to the then Municipality of Metropolitan Toronto
Encroachment Review Committee (ERC), which included representation by TRCA, to purchase
the encroached upon TRCA property. The ERC recommended to TRCA to sell the portion of
TRCA property which contained the concrete retaining wall and backfilled area (i.e. 0.012
hectares; 0.029 acres), provided that the owner remove the fence west of the wall and return the
lawn area to a natural state. The sale was completed on October 7, 1994.
The request from 40 Grovetree Road was circulated to TRCA staff and staff at the City of Toronto
for review and comment. The following comments have been received:
TRCA Planning Staff Comments
The subject TRCA lands are located entirely within the natural system, below the top of slope of
the Humber River valley corridor, and are heavily vegetated. The lands are located within the
Regulated Area of the Humber River.
The Provincial Policy Statement (PPS), 2014, states that development shall generally be directed
to areas outside of hazardous lands adjacent to river systems which are impacted by flooding
and/or erosion hazards. The PPS also provides that natural features and areas shall be protected
for the long term.
TRCA's Living City Policies (LCP) set out development guidelines for properties influenced by
valley and stream corridors. These policies also guide TRCA's role as an approval authority under
Ontario Regulation 166/06, as amended, and as an advisor to municipalities under the Planning
Act with respect to natural heritage and natural hazards. The LCP describes a "Natural System"
as being made up of natural features and areas, water resources, natural hazards, potential
natural cover and/or buffers. The LCP recommends that development not be permitted within the
Natural System and that it be conveyed into public ownership for its long term protection and
enhancement.
This request for disposal, if approved, would result in severing TRCA-owned lands located
entirely within the erosion hazard and natural heritage system. The best way to ensure the long
term protection and enhancement of the natural heritage system and to protect hazard lands is
through public ownership. Accordingly, staff does not support this request as it is not consistent
with provincial and TRCA policies.
City of Toronto Park Forestry and Recreation (PRBF) Staff Comments
The subject lands are designated as "Natural Areas' in the City of Toronto Official Plan and "Open
Space" in the Zoning By-law. The Official Plan policies discourage the sale of land within the
Green Space System. Accordingly, PF&R staff strongly discourage the sale of this parcel.
Deferral Request
At the request of the Executive Committee at Meeting #2/17, held on April 7, 2017, this item was
deferred, pending a site meeting with Deputy Mayor Vincent Crisanti, TRCA staff and Mr. Ghias to
view the site; the site meeting was held on April 10, 2017. Mr. Ghias expressed concern regarding
the condition of the valley slope behind his property and it was recommended that TRCA
geotechnical staff visit the site and complete an assessment of the slope condition behind 40
Grovetree Road. A site visit was conducted on April 11, 2017 and the following are the
conclusions and recommendations based on the observations at that time:
157
1. There is no suggested risk of deep-seated sliding or rotational failure at this site as per
the observations and based on a review of available geotechnical information for the
native stratigraphy likely to be encountered at this site.
2. Some localized over steepened areas in close proximity to the slope crest, likely
created by previous fill placement and grading, may be susceptible to some surface
erosion or very shallow slope movement; however, it is anticipated that the extent of
this surface erosion would be very limited.
3. The current stormwater management on the tableland behind the house is not
satisfactory and should be improved to avoid run off or concentrated flow towards the
slope. The tableland is virtually void of vegetation and the downspout from roof gutters
drains uncontrolled over the bare backyard tableland.
4. With respect to slope remediation, it is recommended that those localized over
steepened areas, which are likely due to the previous grading, be re -graded to a more
stable slope inclination (e.g. 2H:1V) and replanted with suitable native species.
5. It was observed during the site visit that some yard waste and debris has been placed
on the slope crest. These materials should be removed due to the detrimental effects
to existing vegetation and potential surcharge to the slope; bare areas should be
planted with suitable native vegetation.
6. Based on observations at the time of the site visit, retaining walls and/or other retaining
systems are not required for this site.
7. It is also recommended that the site be regularly monitored for any changes in slope
conditions.
Based on staff's ranking method for erosion control projects, the above prescribed slope works
are ranked a low priority and therefore, funding is not available to undertake any work. If through
the regular monitoring program, a change in the site conditions is identified, staff will re-evaluate
the site ranking. In the interim, staff has suggested that the owner revegetate the backyard area,
redirect concentrated roof rainwater runoff away from the valley slope and not place yard waste
and debris on the slope crest.
Conclusion
As noted above, this request for disposal is contrary to provincial, municipal and TRCA policies.
With regard to TRCA's role as a landowner, the sale of the subject lands would create an adverse
precedent and increase TRCA's exposure to similar requests from other landowners. To ensure
the long term protection of the natural features in the area, staff recommends that the subject
parcel be retained in TRCA ownership for conservation purposes.
A plan illustrating the location of the subject lands is attached.
Report prepared by: George Leja, extension 5342
Emails: a Ieia(&trca.on.ca
For Information contact: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: gleia(aftrca.on.ca, jtruesdeIICa)trca.on.ca
Date: April 24, 2017
Attachments: 1
158
Attachment 1
Legend
� c
\ `.Nr
AFF
:)a
36
Subject
Property
Toronto and Region
Conservation
for The Living City
0
Lake ort.no
RES.#B33/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
2097500 Ontario Limited, CFN 57618. Acquisition of property located
south of Teston Road and west of Weston Road, municipally known as
4077 Teston Road, in the City of Vaughan, Regional Municipality of York,
under the "Greenlands Acquisition Project for 2016-2020", Flood Plain and
Conservation Component, Humber River watershed.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.562 hectares (3.859 acres), more or
less, of vacant land, located south of Teston Road and west of Weston Road, said land
being Part of Lot 25, Concession 7, designated as Blocks 89, 90 and 94 on Draft Plan 65M -
prepared by Schaeffer Dzaldov Bennett Ltd. on September 26, 2016, under Job No.
14-830-00, municipally known as 4077 Teston Road, in the City of Vaughan, Regional
Municipality of York, be purchased from 2097500 Ontario Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and execution of
documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the Mark Yarranton, KLM Planning Partners Inc. acting
as agent for the owners.
The owner will provide an appropriate 5 metre wide access to the subject lands by way of a
temporary easement, the final location of which will be determined satisfactory to TRCA staff.
Attached is a plan showing the location of the subject lands
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review, Zoning By-law Amendment Application Z.07.002, and Site Plan Application
19T -07V01 for residential development, TRCA staff established the limits of the open space land.
160
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. It is expected that
the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aD_trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae R. Truesdell, extension 5247
Emails: nwells(a)trca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 29, 2017
Attachments: 1
161
Atachment 11 "
L�
Purple"' �e
Legend
4v
� f �
Subject ) /
Property 4
00
Toronto and Fegion
Conservation
%ar The Living Citp-
PEEL
YORK
RES.#B34/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Mosaik Pinewest Inc., CFN 57615. Acquisition of property located south of
Teston Road and east of Pine Valley Drive, municipally known as 10355
Pine Valley Drive, in the City of Vaughan, Regional Municipality of York,
under the "Greenlands Acquisition Project for 2016-2020", Flood Plain and
Conservation Component, Humber River watershed.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 22.0241 hectares (54.42 acres), more
or less, of vacant land, located south of Teston Road and east of Pine Valley Drive, said
land being Part of Lot 23, Concession 6, designated as Blocks 52 and 53 on Draft Plan of
Subdivision prepared by Guido Papa Surveying on October 6, 2016, under Job No.
16-18-535-00, municipally known as 10355 Pine Valley Drive, in the City of Vaughan,
Regional Municipality of York, be purchased from Mosaik Pinewest Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and execution of
documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the Rosemarie Humphries, Principal, Humphries
Planning Group Inc. acting as agent for Mosaik Pinewest Inc.
Access to the subject lands will be achieved through adjacent TRCA-owned lands.
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review, Zoning By-law Amendment Application Z.03.058, and Site Plan Application
19T -06V10 for residential development, TRCA staff established the limits of the open space land.
163
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. It is expected that
the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aD_trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(a)trca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 29, 2017
Attachments: 1
164
Attachment 1
.r
Creek
Legend
Toronto and Region
I, Conservation
16t The Living, aity-
L�
PEEL
WX
Subject
a
m
Property
J
.r
Creek
Legend
Toronto and Region
I, Conservation
16t The Living, aity-
L�
PEEL
WX
RES.#B35/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Prima Vista Estates Inc. and 840999 Ontario Limited, CFN 57617.
Acquisition of property located south of Teston Road and east of Pine
Valley Drive, municipally known as 10601 Pine Valley Drive and 4333
Teston Road, in the City of Vaughan, Regional Municipality of York, under
the "Greenlands Acquisition Project for 2016-2020", Flood Plain and
Conservation Component, Humber River watershed.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 32.876 hectares (81.238 acres), more
or less, of vacant land, said land being Part of Lots 24 and 25, Concession 6, designated
as Blocks 471, 472, 478, 479, 480, 481, 482, 483 and Block 484 on Draft Plan 19T -03V05
prepared by KLM Planning Partners Inc. on January 10, 2014, under Job No. P-2172,
located south of Teston Road and east of Pine Valley Drive, municipally known as 10601
Pine Valley Drive and 4333 Teston Road, in the City of Vaughan, Regional Municipality of
York, be purchased from Prima Vista Estates Inc. and 840999 Ontario Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and executing
documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the Mark Yarranton, KLM Planning Partners Inc. acting
as agent for the owners.
Access to the subject lands will be achieved through its frontage on Teston Road
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review, Zoning By-law Amendment Application Z.03.024, and Site Plan Application
19T -03V05 for residential development, TRCA staff established the limits of the open space land.
166
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. It is expected that
the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aD_trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(a)trca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 29, 2017
Attachments: 1
167
T
i
10,
Legend
1
x
Subject
Property
.. l
m4
Convei. to Vaughan „r
for hlcipal Par '.
Ate,.. ,• ,:
�e1-1//e •Geek
I
1 •
Toronto and Region
Conservation
for The Living City
-
PEEL SITE
m
J
l
YORK
,.A. Or. -
RES.#B36/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Roybridge Holdings Limited, 1387700 Ontario Limited and Lindvest
Properties Limited, CFN 57616. Acquisition of property located south of
Teston Road and west of Pine Valley Drive, municipally known as 10460 to
10640 Pine Valley Drive, in the City of Vaughan, Regional Municipality of
York, under the "Greenlands Acquisition Project for 2016-2020", Flood
Plain and Conservation Component, Humber River watershed.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 9.2 hectares (22.7 acres), more or
less, of vacant land, said land being Part of Lot 24, Concession 7, designated as Blocks
393 and 398 on Draft Plan 19T -03V25 prepared by KLM Planning Partners Inc. on May 4,
2015 under Job No. P-2174, located south of Teston Road and west of Pine Valley Drive,
municipally known as 10460 to 10640 Pine Valley Drive, in the City of Vaughan, Regional
Municipality of York, be purchased from Roybridge Holdings Limited, 1387700 Ontario
Limited and Lindvest Properties Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and execution of
documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the Mark Yarranton, KLM Planning Partners Inc. acting
as agent for the owners.
The owner will provide an appropriate 5 metre wide access to the subject lands by way of a
temporary easement, the final location of which will be determined satisfactory to TRCA staff.
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review, Zoning By-law Amendment Application Z.03.107, and Site Plan Application
19T -03V25 for residential development, TRCA staff established the limits of the open space land.
169
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. It is expected that
the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aD_trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae R. Truesdell, extension 5247
Emails: nwells(a)trca.on.ca, jtruesdell(cDtrca.on.ca
Date: March 29, 2017
Attachments: 1
170
Attachment 1
L --�%
Legend
L�
i
Subjecf� J�
PropertyN�-,� 1
Toronto and Fegion
Conservation
%ar The Living City
YORK
PEEL SITE
TOROx
La" Oman.
RES.#B37/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Squire Ridge Investments Limited, CFN 57650. Acquisition of property
located south of Langstaff Road and east of Huntington Road, municipally
known as 6545 Langstaff Road, in the City of Vaughan, Regional
Municipality of York, under the "Greenlands Acquisition Project for
2016-2020", Flood Plain and Conservation Component, Humber River
watershed.
Moved by: Jack Heath
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 5.52 hectares (13.64 acres), more or
less, of vacant land, said land being Part of Lot 10, Concession 9, designated as Blocks 5
and 6 on Draft Plan of Subdivision prepared by Schaeffer Dzaldov Bennett Ltd. on
September 6, 2016 under Job No. 04-740-0013, located on the south of Langstaff Road and
east of Huntington Road, municipally known as 6545 Langstaff Road, in the City of
Vaughan, Regional Municipality of York, be purchased from Squire Ridge Investments
Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and executing
documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the Ryan Virtanen, KLM Planning Partners Inc. acting as
agent for the owners.
Access to the subject lands will be achieved by a temporary easement which will expire upon the
construction and assumption of an interior municipal road.
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review, Zoning By-law Amendment Application Z.13.029, and Site Plan Application
19T -06V01 for industrial and employment lands development, TRCA staff established the limits of
the open space land.
172
TAXES AND MAINTENANCE
Taxes for 2017 have been estimated at $2,000.00. Based on TRCA's preliminary review of the
environmental criteria for lands that are eligible to receive a property tax exemption under the
provincial Conservation Land Tax Incentive Program, it would appear that the subject property
should be eligible for a tax exemption. It is expected that the subject parcel of land will not
significantly impact TRCA's maintenance costs at this location.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(a)trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(aDtrca.on.ca, jtruesdell(cDtrca.on.ca
Date: April 7, 2017
Attachments: 1
173
�e w
f
Legend
L�
I�
J�
Subject
Property
Toronto and Region
Conservation
for The Living City -
RiM
or,—
RES.#B38/17 - THE REGIONAL MUNICIPALITY OF PEEL
Request for a Permanent Easement Required for Monitoring
Town of Caledon, Regional Municipality of Peel, Humber River Watershed,
CFN 23159. Receipt of a request from The Regional Municipality of Peel
for a permanent easement required for monitoring of the Albion Landfill Site
on Humber Station Road, north of Castlederg Sideroad south of Old
Church Road, in the Town of Caledon, Regional Municipality of Peel,
Humber River watershed.
Moved by: Jack Heath
Seconded by: Mike Mattos
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from The Regional Municipality of
Peel to provide a permanent easement for monitoring of the Albion Landfill Site, located
on Humber Station Road, north of Castlederg Sideroad and south of Old Church Road, in
the Town of Caledon, Regional Municipality of Peel, Humber River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with The Regional
Municipality of Peel in this instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 40.72
hectares (100.62 acres), more or less, said property being described as Part of Lot 18,
Concession 4 and Parts of Lot 18 and 19, Concession 5, Town of Caledon, Regional
Municipality of Peel, be granted in favour of The Regional Municipality of Peel;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs to be
paid by The Regional Municipality of Peel;
THAT The Regional Municipality of Peel is to fully indemnify TRCA from any and all claims
from injuries, damages or costs of any nature resulting in any way, either directly or
indirectly, from the granting of this easement;
THAT an archaeological investigation be completed, with any mitigation measure being
carried out to the satisfaction of TRCA staff, at the expense of The Regional Municipality
of Peel;
THAT said conveyance be subject to the approval of the Minister of Natural Resources
and Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
The Regional Municipality of Peel has requested a permanent easement required for monitoring
the Albion Landfill Site on Humber Station Road, north of Castlederg Sideroad and south of Old
Church Road, in the Town of Caledon, Regional Municipality of Peel, Humber River watershed.
175
On June 1, 1976, TRCA enter into an agreement with the Regional Municipality of Peel to operate
the Albion Landfill on TRCA owned -land. The site was closed on September 1, 1993. The
Regional Municipality of Peel has been monitoring the landfill site based on an annual permission
to enter agreement since the closure. The Regional Municipality of Peel would like to formalize
their access rights with a permanent easement.
The subject lands are part of a larger parcel acquired from J.S. Argent on December 5, 1961
under the Humber Forest Project, M.E. Grogan on February 27, 1970 under Bolton Dam and
Reservoir Project, and Canadian Pacific Railway Company on May 25, 1999 under the Humber
River Flood Plain Lands Project.
A sketch illustrating the location of the permanent easement is attached.
FINANCIAL DETAILS
The Regional Municipality of Peel has agreed to assume all legal, survey and other costs involved
in completing this transaction.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewonq(atrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewonq(dtrca.on.ca, Itruesdell(abtrca.on.ca
Date: April 10, 2017
Attachments: 1
176
a
ent� I
w anent F
3s \ ent/ `
Legend `
Toronto and Region
W Conservation
® for The Living, City
FEEI
IE
N
Lake On(arin
RES.#B39/17 - CITY OF TORONTO
Request for a Permanent Easement Required for Replacement of an
Existing Storm Sewer
City of Toronto, Humber River Watershed, CFN 57739. Receipt of a
request from the City of Toronto to provide a permanent easement for the
replacement of an existing storm sewer and outfall, located east of Weston
Road and south of Sheppard Avenue West, in the City of Toronto
(Etobicoke York Community Council Area), Humber River watershed.
Moved by: Mike Mattos
Seconded by: Michael Di Blase
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from the City of Toronto to
provide a permanent easement for the replacement of an existing storm sewer and outfall,
located west of Weston Road and south of Sheppard Avenue West, in the City of Toronto
(Etobicoke York Community Council Area), Humber River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Toronto in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of 0.59
hectares (1.45 acres), more or less, said land being designated as Part 1, as shown on a
plan prepared by the City of Toronto Engineering and Construction Services Department,
Engineering Services Section, Land and Property Surveys, Sketch No. PS -2016-056, dated
April 20, 2016, City of Toronto, be granted in favour of the City of Toronto;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs are to
be paid by the City of Toronto;
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from the
granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of the City of Toronto;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of the City of Toronto;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by the
City of Toronto prior to commencement of construction;
THAT said easement be subject to the approval of the Minister of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
178
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
The City of Toronto has requested a permanent easement for the replacement of an existing
storm sewer and outfall, located to the west of Weston Road and south of Sheppard Avenue
West. Replacement of the storm sewer and outfall is required due to the deterioration of the
existing storm sewer system and to improve the drainage on the parkland behind the residential
properties on the west side of Weston Road, south of Sheppard Avenue West.
The site is located within the Regional Storm flood plain and the Regulated Area of the Humber
River.
The subject TRCA-owned lands were acquired from J & E Ryerson on January 15, 1963, A & M
Ysselstyn on February 25, 1963 and Pamcrest Enterprises Limited on March 6, 1981, under the
Humber River Flood Plain Lands Acquisition Project; and from The Order of St. Basil The Great
Holding Corporation on August 31, 1998, under the Greenspace Protection and Acquisition
Project, 1996-2000, Flood Plain and Conservation Component, Humber River Watershed.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by
TRCA staff, revegetated with native woody and herbaceous plant material in accordance
with existing TRCA landscaping guidelines.
A plan illustrating the permanent easement location is attached.
FINANCIAL DETAILS
The City of Toronto has agreed to assume all legal, survey and other costs involved in completing
this transaction.
Report prepared by: George Leja, extension 5342
Emails: gleia(a2trca.on.ca
For Information contact: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: gleia(a)trca.on.ca, jtruesdell(a)trca.on.ca
Date: April18, 2017
Attachments: 1
179
Permanent
Easement
r R ivev// �N
Legend
® Taranto and Region
Conservation
/or The Livivo City
L,
Section II — Items for Executive Action
RES.#B40/17 - CANADA GREEN BUILDING COUNCIL AND ITS GREATER TORONTO
CHAPTER
Continuation of Partnership Agreement. Approval to continue the existing
partnership agreement with the Greater Toronto Chapter of the Canada
Green Building Council.
Moved by: Colleen Jordan
Seconded by: Vincent Crisanti
THAT Toronto and Region Conservation Authority (TRCA) execute the 2017 work plan
agreement with the Greater Toronto Chapter of the Canada Green Building Council
(CaGBC) to December 31, 2017;
THAT TRCA continue to work with the Greater Toronto Chapter of CaGBC to deliver the
initiatives in accordance with the signed Memorandum of Understanding (MOU), as
amended in 2015, with CaGBC;
AND FURTHER THAT authorized TRCA officials be directed to take the action necessary
to implement the agreement.
CARRIED
BACKGROUND
As a founding partner of the Canada Green Building Council, TRCA has worked closely with
CaGBC on several initiatives since it was first established in 2003. CaGBC's mission is to "lead
and accelerate the transformation to high -performing, healthy green buildings, homes and
communities throughout Canada." TRCA has provided ongoing support in their work towards
this mission, which is well -aligned with TRCA's vision for The Living City.
The Authority first formalized this relationship by approving the establishment of an MOU between
TRCA and CaGBC in 2010. By entering into the MOU, TRCA agreed to work in partnership with
CaGBC on various initiatives focused on increasing the uptake of green building practices and
promoting sustainable community development in the Greater Toronto Area. At Authority
Meeting #3/10, held on April 30, 2010, Resolution #A54/10 was approved as follows:
THAT Toronto and Region Conservation Authority enter into a Memorandum of
Understanding with the Canada Green Building Council.
The purpose of the MOU was to formalize the working relationship between the two organizations
and to establish strategic joint priorities. Among the many roles and responsibilities outlined in
the MOU was the condition for TRCA to support and advocate for local funding opportunities and
to work closely with the Greater Toronto Chapter (GTC). Following Resolution #A54/10, TRCA
and GTC have developed and executed annual work plan agreements which identify key
activities and initiatives to be completed in each calendar year.
In 2016, funding provided to the Greater Toronto Chapter contributed toward the following
deliverables:
181
Municipal Engagement and Knowledge Sharing
Review and update to online municipal green building case study submissions and
amendments to the online Ontario Green Policy Hub including policy additions from
Toronto, Vaughan and Hamilton
Revamp and dissemination of the Sustainable Communities Toolkit to 17 municipalities
Hosted three Municipal Leaders Forum working group meetings in southern Ontario
including one in Peel Region
Continued advocacy and input into the Province of Ontario's framework for mandatory
building energy and water usage reporting for benchmarking overall energy performance
Strengthening Green Building Knowledge and Awareness
Delivery of large and small scale industry events with a focus on
networking/awareness/education amongst the green building community
Hosted four large scale networking events and 15 education events
Toronto Focus (SAB Magazine supplement)
Production and coordination of bi-annual Toronto Focus supplement distributed through
SAB magazine.
RATIONALE
The following table provides an overview of the 2017 work plan. Execution of these activities is
carried out, in part, with the annual grant funding provided by TRCA.
Initiative Name
Timing
Budget
Municipal Leaders Forum
o Standard website maintenance
Ongoing
1,500.00
o Coordinating three MLF Working Group meetings in Southern
Q2 -Q4
1,500.00
Ontario
$ 3,000.00
Annual Events
o Large-scale Chapter Event coordination and logistics
Q2, Q3, Q4
$ 7,500.00
Education Events
o National Workshops
Ongoing
$ 10,000.00
o Chapter Education, including the Green Building Breakfast
Ongoing
Series, a brand new Existing Buildings Summit, a Zero Carbon
Buildings Course, Ontario Building Code Workshop, GPRO etc.
Thank You Campaign
o Administration and marketing materials
Q3, Q4
$ 1,500.00
Awards Program
c Research and outreach for the Innovation in LEED Awards
Q1 -Q3
$3,000.00
$ 22,000.00
"Toronto FOCUS" Chapter Supplements in SAB Magazine
Q1 &Q3
$ 5,000.00
o Content development and production of two (2) Editions (spring
and fall) of Chapter -dedicated supplement to respected industry
magazine
$ 5,000.00
TOTAL
$30,000.00
182
FINANCIAL DETAILS
Funding for the CaGBC GTA workplan is available in account 415-89, provided by the City of
Toronto and Region of Peel.
Report prepared by: Patricia Lewis, extension 289-268-3903
Emails: plewis(cDtrca.on.ca
For Information contact: Glenn MacMillan, extension 289-268-3901
Emails: umacmillan(a)trca.on.ca
Date: April 10, 2017
183
Section IV — Ontario Regulation 166/06, As Amended
RES.#641/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected
Moved by: Jack Heath
Seconded by: Michael Di Biase
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.4 and 10.6, which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.4 & 10.6 WERE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency with policies;
applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive
modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of
violations/after the fact permits, trail construction.
CITY OF MISSISSAUGA
10.1 4452 LEE DRIVE
To construct, reconstruct, erect or place a building or structure on (4452 Lee Drive), in
the City of Mississauga, Etobicoke Creek Watershed. The purpose is to recognize the
construction of a 4.7 m by 7.3 m (15.5 ft by 24 ft) deck located at the rear of an existing
dwelling within TRCA's Regulated Area of the Etobicoke River Watershed. The
described works were initiated without the issuance of a TRCA or municipal building
permit. As such, an additional permit application fee of 100% was charged for this "after -
the -fact" permit.
CFN: 57707 - Application #: 0410/17/MISS
Report Prepared by: Andrea Terella 5657 andrea.terella@trca.on.ca
For information contact: Leilani Lee -Yates 5370 llee-yates@trca.on.ca
Date: April 25, 2017
ME
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
10.2 2432014 ONTARIO INC./THE EASTON'S GROUP
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere
and alter a watercourse on Lot 11, Concession 1, (4050 Yonge Street), in the City of
Toronto (North York Community Council Area), Don River Watershed as located on the
property owned by 2432014 Ontario Inc./The Easton's Group. The purpose is to
construct a new nine storey office/hotel building with four levels of underground parking
at the location of an existing surface parking lot within the East Don River Valley. Also
proposed is slope stabilization works along 100 metres of the adjacent east bank of the
Don River to arrest ongoing erosion. The proposed slope stabilization works include the
placement of rip rap stone along the lower river bank, re -grading and planting of the
upper river bank and planting within the proposed 10 metre building setback from the top
of river bank.
CFN: 57393 - Application #: 0165/17/TOR
Report Prepared by: Mark Rapus 5259 mrapus@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: April 24, 2017
CITY OF VAUGHAN
10.3 MONARCH CASTLEPOINT KIPLING NORTH DEVELOPMENT LTD. AND MONARCH
CASTLEPOINT KIPLING SOUTH DEVELOPMENT LTD.
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere
and alter a watercourse on Lot 26, 27, 28, 29, 30, Concession 8, 9, (10980 Kipling
Avenue and 11178 Kipling Avenue), in the City of Vaughan, Humber River Watershed as
located on the property owned by Monarch Castlepoint Kipling North Development Ltd.
and Monarch Castlepoint Kipling South Development Ltd. The purpose is to allow
development within a Regulated Area of the Humber River Watershed to facilitate the
construction of a pedestrian trail system, installation of a pedestrian bridge and
implementation of edge management / restoration plantings in two draft approved plans
of subdivision (19T -13V009 and 19T -13V008) within Block 55 East, west of Kipling
Avenue and north of Teston Road, in the City of Vaughan.
CFN: 56584 - Application #: 1091/16NAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: April 25, 2017
TOWN OF CALEDON
10.4 12199 HIGHWAY 50
To construct, reconstruct, erect or place a building or structure on Lot 1, Concession 7
ALBION, (12199 Highway 50), in the Town of Caledon, Humber River Watershed. The
purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a second storey to an existing one
storey dwelling, associated with a municipal building permit.
CFN: 57454 - Application #: 0226/17/CAL
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: April 25, 2017
RES.#B42/17 - STANDARD DELEGATED PERMITS
Moved by: Jack Heath
Seconded by: Michael Di Blase
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.5 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and
Development Division staff and are received monthly by the Executive Committee. Standard Permits , including
Emergency Infrastructure Works permissions, are subject to the authorization of designated staff appointed as
Enforcement Officers, as per Authority Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and
emergency infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF MARKHAM
111 MORGAN AVENUE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to demolish an existing one -storey dwelling and to facilitate the construction of a two-
storey dwelling, approximately 604.37 square metres (6505 square feet) in size, with a rear
patio.
CFN: 57714 - Application #: 0414/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: April 20, 2017
21 PERSONNA BOULEVARD -Rouge River Watershed
The purpose is to undertake works within TRCA's regulated area of the Rouge River watershed
to facilitate the reconstruction and minor expansion of an existing bungalow with integral garage
(approximately 211.04 m2) into a two-storey dwelling (approximately 587.14 m2) and the
replacement and expansion of an existing septic system.
More
CFN: 55412 - Application #: 0169/16/MARK
Report Prepared by: Jeffrey Thompson, extension 5386, email jthompson@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: April 4, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to restore and re -grade the north bank of Robinson Creek by placing a
vegetated buttress and riparian plantings on the north bank of the Creek adjacent to Main Street
Markham Road South, near Old Wellington Street in the Rouge River Watershed on property
owned by the City of Markham. The Ministry of Natural Resources and Forestry (MNRF)
Redside Dace construction timing window will apply to this project, unless otherwise specified in
writing by MNRF.
CFN: 56924 - Application #: 0093/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: April 19, 2017
60 SQUIRE BAKER'S LANE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a new one -storey rear addition to an existing
dwelling associated with a municipal building permit.
CFN: 57508 - Application #: 0297/171MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: March 17, 2017
52 BERNADOTTE DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a patio garden, inground pool and cabana at
the rear of an existing dwelling.
CFN: 57147 - Application #: 0384/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: April 6, 2017
CITY OF PICKERING
343 GRANBY COURT - Duffins Creek Watershed
The purpose is to construct an inground pool with associated patio hardscaping in the rear yard
of the existing single family detached dwelling at 343 Granby Court in the City of Pickering.
CFN: 57437 - Application #: 0217/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 31, 2017
187
SR & R BAY RIDGES (PLAZA II) LTD. - Frenchman's Bay Watershed
The purpose is to construct a 25 -storey residential building including 231 units and 2 storeys of
below grade parking at 1261 Bayly Street in the City of Pickering. Also proposed is a 22 -unit
stacked townhouse block, surface parking, and reconfiguration of the existing asphalt pathway..
CFN: 57407 - Application #: 0176/171PICK
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 18, 2017
813 PRIMROSE COURT - Frenchman's Bay Watershed
The purpose is to construct an inground pool with associated hardscaping to the rear of the
existing single family detached dwelling at 813 Primrose Court in the City of Pickering.
CFN: 56387 - Application #: 0958/16/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 28, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
4 PLAYDELL COURT - Humber River Watershed
The purpose is to construct an in -ground pool in the rear yard of the existing dwelling at 4
Playdell Court in the City of Toronto (Etobicoke York).
CFN: 57647 - Application #: 0392/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 7, 2017
225 RIVERSIDE DRIVE - Humber River Watershed
The purpose is to replace the existing deck to the rear of the existing single family detached
dwelling at 225 Riverside Drive in the City of Toronto (Etobicoke York). The existing deck is to
be removed.
CFN: 56105 - Application #: 0627/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 29, 2017
21 MILL COVE - Humber River Watershed
The purpose is to construct a second storey addition and rear/side patio to the existing single
storey dwelling as well as a detached garage at 21 Mill Cove in the City of Toronto (Etobicoke
York). The existing detached garage is to be demolished.
CFN: 57207 - Application #: 0053/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 19, 2017
ME
39 THE KINGSWAY - Humber River Watershed
The purpose is to construct a new two storey single family detached dwelling on the existing
vacant lot of record municipally described as 39 The Kingsway in the City of Toronto (Etobicoke
York).
CFN: 55396 - Application #: 0152/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 4, 2017
38 RAVENSCREST DRIVE - Mimico Creek Watershed
The purpose is to construct a rear deck to the existing single storey detached dwelling at 38
Ravenscrest Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 56694 - Application #: 1007/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 28, 2017
TORONTO TRANSIT COMMISSION - Humber River Watershed
The purpose is to construct a new Traction Power Sub -station, retaining walls, and perform
associated site grading.
CFN: 56598 - Application #: 1115/16/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: April 10, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
34 GEORGE HENRY BOULEVARD - Don River Watershed
The purpose is to construct a stone patio and armour stone retaining wall at the rear of the
existing single family detached dwelling on lands municipally described as 34 George Henry
Boulevard in the City of Toronto (North York Community Council Area).
CFN: 57643 - Application #: 0388/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 11, 2017
14 BROOKFIELD ROAD - Don River Watershed
The purpose is to undertake minor regrading of the slope and remove landslide deposition from
the slope toe as a result of a slope failure after the July 8, 2013 storm event at 14 Brookfield
Road in Toronto (North York Community Council Area).
ME
CFN: 57432 - Application #: 0216/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 17, 2017
16 BROOKFIELD ROAD - Don River Watershed
The purpose is to undertake minor regrading of the slope and remove landslide deposition from
the slope toe as a result of a slope failure after the July 8, 2013 storm event at 16 Brookfield
Road in Toronto (North York Community Council Area).
CFN: 57433 - Application #: 0215/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 17, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
34 ROSEMOUNT DRIVE - Don River Watershed
The purpose is to construct a garage to the side of the existing two storey detached dwelling at
34 Rosemount Drive in the City of Toronto (Scarborough Community Council Area).
CFN: 56458 - Application #: 0903/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 19, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Waterfront Watershed
The purpose is to undertake upgrades to an existing trail. No in -water work is within the scope
of this project.
CFN: 56869 - Application #: 0113/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 30, 2017
32 RUSHBROOKE AVENUE - Don River Watershed
The purpose is to underpin the basement of the existing semi-detached single family dwelling at
32 Rushbrooke Avenue in the City of Toronto (Toronto and East York Community Council
Area).
CFN: 57459 - Application #: 0230/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: April 3, 2017
190
CITY OF VAUGHAN
208 CENTRE STREET - Don River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River Watershed, the
construction of a replacement residential dwelling measuring 610.9 sq. m. (6576 sq. ft.). The
subject property is known municipally as 208 Centre Street, in the City of Vaughan.
CFN: 57599 - Application M 0355/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 5, 2017
GOLDPARK (WOODBRIDGE) INC. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate construction of a storm sewer and outfall structure, which discharges into a
Tributary of the West Don River, south of Jackson Street, in the City of Vaughan.
CFN: 55292 - Application #: 0027/16NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
Date: April 5, 2017
19 RYDER ROAD - Don River Watershed
The purpose is to facilitate, in TRCA's Regulated Area of the Don River Watershed, the
development of a 424.2 sq. m. (4565.97 sq. ft.) single detached dwelling on lands known
municipally as 19 Ryder Road, in the City of Vaughan.
CFN: 57411 - Application #: 0180/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 18, 2017
TOWN OF AJAX
TOWN OF AJAX - Duffins Creek Watershed
The purpose is to reconstruct Riverside Drive to an urban cross-section from Rossland Road to
Delaney Drive, in the Town of Ajax. The cold water construction timing window will be applied to
this project.
CFN: 53240 - Application M 0222/15/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: April 3, 2017
191
TOWN OF CALEDON
188 OLD KING ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 8.5 m. 12.1 m. (28 ft. by 40 ft.) garage and
drainage swale associated with a municipal building permit.
CFN: 56255 - Application #: 0731/16/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 29, 2017
0 ROLLING MEADOW DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 435 sq.m (4,685 sq.ft) single detached
dwelling and septic system associated with a municipal building permit.
CFN: 56189 - Application #: 0677/161CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: March 29, 2017
PEEL DISTRICT SCHOOL BOARD - Etobicoke Creek Watershed
The purpose is to site grade and place fill within the Regulated Area of the Etobicoke Creek
Watershed to facilitate the development of a residential draft plan of subdivision.
CFN: 57715 - Application #: 0415/17/CAL
Report Prepared by: Antonietta Gentile, extension 5796, email agentile@trca.on.ca
For information contact: Leilani Lee -Yates, extension 5370, email Ilee-yates@trca.on.ca
Date: April 17, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to construct an emergency overflow spillway at the Alloa reservoir and pumping
station located just north of Mayfield Road and east of Credit View Road in the Town of
Caledon. No in -water works are associated with this project.
CFN: 56650 - Application #: 0187/17/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: April 20, 2017
111101,171.[o];gN_744BIG] �0= ie F1f27Tx" — XTAIF=- �T-- 6
The purpose is to reconstruct Kennedy Road from King Street to Boston Mills Road, in the Town
of Caledon. The warm water construction timing window will apply to this project.
CFN: 56498 - Application #: 0024/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: April 20, 2017
192
TOWN OF CALEDON - Humber River Watershed
The purpose is to construct an additional volleyball court at Dicks Dam Park in the Town of
Caledon. No in -water works are associated with this project.
CFN: 57558 - Application #: 0421/171CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: April 20, 2017
TOWN OF RICHMOND HILL
355 NORTH LAKE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of an in -ground pool and 6.5 sq.m (70 sq.ft)
cabana located at the rear of an existing dwelling.
CFN: 57391 - Application #: 0160/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: April 18, 2017
52 LOYAL BLUE CRESCENT - Rouge River Watershed
The purpose is to undertake works within the TRCA's Regulated Area of the Rouge River
Watershed to demolish an existing deck in order to facilitate the construction of a new deck
approximately 37.11 square metres (400 square feet) in size, at the rear of the existing dwelling.
CFN: 57468 - Application #: 0243/17/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: April 10, 2017
LABOURERS INTERNATIONAL UNION OF NORTH AMERICA LIUNA - Rouge River
Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed to facilitate site alteration and grading, installation of services (including a storm
sewer pipe, headwall and plunge pool), and the implementation of erosion and sediment control
measures in support of an expansion to the facility, in support of an approved site plan
application associated with a municipal building permit.
CFN: 57188 - Application #: 0054/17/RH
Report Prepared by: Doris Cheng, extension 5306, email dcheng@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: March 29, 2017
193
REGIONAL MUNICIPALITY OF YORK - Don River Watershed
The purpose is to undertake emergency works to replace an existing watermain along Bathurst
Street between Birch Avenue and Highway 7, in the Town of Richmond Hill. The works include
installation of a 400mm diameter watermain within the road right-of-way on the east side of
Bathurst Street, predominantly within the existing paved road/sidewalk above the existing
culverts. This permit is in accordance with TRCA Permission for Emergency Infrastructure
Works Review Protocol (Authority Res. #A105/15). The Redside Dace Timing Window will apply
to this project, unless otherwise specified in writing by the Ministry of Natural Resources and
Forestry (MNRF).
CFN: 56045 - Application #: 0294117/RH
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: April 6, 2017
YORK REGION RAPID TRANSIT CORPORATION - Don River Watershed
The purpose is to undertake widening of Yonge Street between south of Trayborn Drive to
Leonard Street. The works are required to accommodate VivaNext Bus Rapid Transit (BRT)
project. The works will include placement of fill to support the new roadway, utility relocations
and sewer works to facilitate the widening.
CFN: 54502 - Application #: 0878/151RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: April 10, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
81 PARK DRIVE NORTH - Duffins Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 371.8 sq. m. (4,002 sq. ft.) replacement
single family dwelling, 15.6 sq. m. (168 sq. ft.) swimming pool, 16 sq. m. (171 sq. ft.) accessory
building and a 4.5 sq. m. (48 sq. ft.) replacement shed, associated with a municipal building
permit. The subject property is located on lands known municipally as 81 Park Drive North, in
the Town of Whitchurch-StouffviIle.
CFN: 57595 - Application #: 0359/17/WS
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 19, 2017
194
TOWNSHIP OF KING
135 KINGSWORTH ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 356 sq. m. (3831.95 sq. ft.) replacement
single detached dwelling, 74.36 sq. m. (800.40 sq. ft.) swimming pool and a sewage septic
system, associated with a municipal building permit. The subject property is located on lands
known municipally as 135 Kingsworth Road, in the Township of King.
CFN: 57716 - Application #: 0416/171KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 20, 2017
13415 7TH CONCESSION - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 106.3 sq. m. (1144.2 sq. ft.) swimming pool
and associated stone patio landscaped area, associated with a municipal building permit. The
subject property is located on lands known municipally as 13415 7th Concession, in the
Township of King.
CFN: 56479 - Application #: 0926/161KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: April 19, 2017
45 LINTON LANE - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of two Provincially Significant
Wetlands associated with Bell's Lake in the Humber River Watershed, the construction of a
replacement residential dwelling measuring 405.5sq. m. (4364sq. ft.) in addition to a new
detached shed measuring 325.15sq. m. (3450sq. ft.). The subject property is known municipally
as 45 Linton Lane, in the Township of King.
CFN: 57460 - Application #: 0231/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: March 24, 2017
64 ELIZABETH DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 409 sq.m (4402.44 sq.ft) single family
replacement dwelling with an associated lockstone patio associated with a municipal building
permit.
CFN: 57640 - Application #: 0377/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: April 18, 2017
195
92 MANITOU DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 63.57 sq. m. swimming pool and a sewage
septic system, associated with a municipal building permit. The subject property is located on
lands known municipally as 92 Manitou Drive, in the Township of King.
CFN: 57706 - Application #: 0401/17/KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 19, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency Infrastructure Works
permissions are subject to authorization by staff designated as Enforcement Officers as per Auth. Res. #A198/13 and
#A103/15, respectively. All routine and emergency infrastructure works are located within a Regulated Area,
generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF MISSISSAUGA
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the
north side of Rena Road, west of Slough Street, in the City of Mississauga, Mimico Creek
Watershed as located on the property owned by the City of Mississauga under franchise
agreement with Enbridge Gas Distribution Inc. The purpose is to installation of 4" gas pipeline.
No in -water works are associated with this project.
CFN: 56653 - Application #: 1285/16/MISS
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: April 12, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Riverbank Drive, Babington Court and Hatton Court, near Islington Avenue and Dundas
Street West, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek
Watershed as located on property owned by the City of Toronto. The purpose is to install
conduit and grade level boxes. No in -water work is within the scope of this project.
CFN: 56755 - Application #: 1068/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 18, 2017
196
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Heavitree Drive, Chalkfarm Drive, Neames Crescent, Rabton Court and Marlington Crescent,
near Jane Street and Wilson Avenue, in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on property owned by the City of Toronto. The
purpose is to install conduit and grade level boxes and replace pedestals. No in -water work is
within the scope of this project.
CFN: 57160 - Application #: 0095/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 31, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Rockcliffe Boulevard, Deakin Avenue and Alliance Avenue, in the City of Toronto (Etobicoke
York Community Council Area), Humber River Watershed as located on property owned by the
City of Toronto. The purpose is to install conduit. No in -water work is within the scope of this
project.
CFN: 57337 - Application #: 0281/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 19, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and structure maintenance at Colony
Park, 2100 Martin Grove Road, near Albion Road, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed as located on property owned by the City
of Toronto. The purpose is to undertake playground enhancements at Colony Park. No in -water
work is within the scope of this project.
CFN: 57336 - Application #: 0265/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 20, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
TELUS COMMUNICATIONS INC.
To undertake utility pole installation within the Yonge Street road right-of-way, from Old York
Mills Road to McGlashan Road, near Yonge Street and York Mills Road, in the City of Toronto
(North York Community Council Area), Don River Watershed as located on property owned by
the City of Toronto The purpose is to install new conduit and utility poles. No in -water work is
within the scope of this project.
197
CFN: 57331 - Application #: 0189/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 19, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Manhattan Drive, near Warden Avenue and Lawrence Avenue East, in the City of Toronto
(Scarborough Community Council Area), Don River Watershed as located on property owned
by the City of Toronto. The purpose is to install new conduit and vault. No in -water works are
within the scope of this project.
CFN: 56513 - Application #: 0951/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 30, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Beechgrove Drive, Satok Terrace and Janellan Terrace, located near Lawrence Avenue East
and Morningside Avenue, in the City of Toronto (Scarborough Community Council Area),
Highland Creek Watershed as located on property owned by the City of Toronto. The purpose
is to place conduit and grade level boxes. No in -water work is within the scope of this project.
CFN: 57338 - Application #: 0298/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 24, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Lawrence Avenue East, west of Overture Road, in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed as located on property owned by the City
of Toronto. The purpose is to install conduit and new grade level boxes. No in -water work is
within the scope of this project.
CFN: 57341 - Application #: 0322/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 24, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Meadowcliffe Drive, near Kingston Road and Pine Ridge Drive, in the City of Toronto
(Scarborough Community Council Area), Waterfront Watershed as located on property owned
by the City of Toronto. The purpose is to replace existing watermains and undertake road
resurfacing. No in -water work is within the scope of this project.
CFN: 56900 - Application #: 1221/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 10, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on McCowan Road and Nugget Avenue, located north of Sheppard Avenue East, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on
property owned by the City of Toronto. The purpose is to install conduit, a pedestal and vault.
No in -water work is within the scope of this project.
CFN: 57335 - Application #: 0263/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 30, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Wildwood Crescent, north of Hollywood Crescent, located near Woodbine Avenue and
Gerrard Street East in the City of Toronto (Toronto and East York Community Council Area),
Waterfront Watershed as located on property owned by the City of Toronto. The purpose is to
place conduit and grade level boxes. No in -water work is within the scope of this project.
CFN: 56818 - Application #: 1300/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: March 31, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Park Road at Rosedale Valley Road, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to install a new manhole and conduit. No in -water work is within the
scope of this project.
199
CFN: 57344 - Application M 0311/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 10, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Lake Shore Boulevard East, from
Leslie Street to Woodbine Avenue, in the City of Toronto (Toronto and East York Community
Council Area), Waterfront Watershed, as located on property owned by the City of Toronto. The
purpose is to undertake road resurfacing and sidewalk reconstruction. No in -water work is within
the scope of this project.
CFN: 56829 - Application #: 0026/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: April 24, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Davies Avenue and East Don Roadway, south of Thompson Street, in the City of Toronto
(Toronto and East York Community Council Area), Don River Watershed, as located on the
property owned by the City of Toronto under franchise agreement with Enbridge Gas
Distribution Inc. The purpose is to install a NPS 4 PE IP gas pipeline. No in -water works are
within the scope of this project.
CFN: 55327 - Application M 0314/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: April 10, 2017
TOWN OF AJAX
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on a Trans -Northern Pipeline Inc. (TNPI) site (MP -311.85-
2017), located on Deer Park Golf Course, near Concession Road 5 and Sideline 4, in the Town
of Ajax, Carruthers Creek Watershed as located on property owned by a private landowner with
access granted through a permission to enter. The purpose is to undertake an integrity dig to
conduct repairs to an existing pipeline at a Trans -Northern Pipeline Inc. (TNPI) site (MP -311.85-
2017), located on Deer Park Golf Course, near Concession Road 5 and Sideline 4, in the Town
of Ajax. No in -water works are associated with this project.
CFN: 57488 - Application M 0371/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: April 25, 2017
200
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the south side of Industrial Road, near Yonge Street, in the Town of Richmond Hill, Don
River Watershed as located on the property owned by the Town of Richmond Hill under
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 6 PE
IP gas pipeline within an existing roadway on the south side of Industrial Road near Yonge
Street. No in -water works are associated with this project.
CFN: 54921 - Application #: 0315/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: April 18, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within existing roadways on
Wellman Drive, Worthington Avenue, and Snively Street, located north of Delphinium Avenue, in
the Town of Richmond Hill, Humber River Watershed as located on the property owned by the
Town of Richmond Hill under franchise agreement with Enbridge Gas Distribution Inc. The
purpose is to install two inch, four inch and six inch gas pipelines within existing roadways. No
in -water works are associated with this project.
CFN: 56844 - Application #: 0423/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: April 25, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
REGIONAL MUNICIPALITY OF YORK
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Bethesda Side Road east of Kennedy Road, in the Town of Whitchu rch-Stouffvi lie,
Rouge River Watershed as located on the property owned by Regional Municipality of York.
The purpose is to remove an existing 450mm x 900mm x 11.52m Corrugated Steel Pipe Arch
(CSPA) culvert and replace it with a 900mm x 14m Corrugated Steel Pipe (CSP) culvert on
Bethesda Side Road, east of Kennedy Road, in the Town of Whitchurch-Stouffville. The
proposed works also include removal and repaving of the asphalt roadway area. The Ministry of
Natural Resources and Forestry (MNRF) Redside Dace timing window will apply to this
proposal, unless otherwise specified in writing by MNRF. Please note that the permit issued on
April 4, 2016 for CFN 54843 - C-160248 for the proposed repairs to the existing culvert is no
longer valid. A new permit has been issued noting the change of scope of work for this site and
is reflected by CFN 56043 - C-170298 dated April 12, 2017.
CFN: 56043 - Application #: 0292/17/WS
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: April 12, 2017
201
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are
received monthly by the Executive Committee. The permission of minor works is subject to authorization by the
Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located
within a Regulated Area, outside of the flood plain and in the opinion of staff do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
70 LAURENTIDE CRESCENT
To install a swimming pool on Lot 25, Plan PIN: 14219-0939, (70 Laurentide Crescent), in the
City of Brampton, Humber River Watershed.
CFN: 57713 - Application #: 0409/171BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: April 21, 2017
CITY OF MARKHAM
48 DELAIR CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 44, Plan M-
841, (48 Delair Crescent), in the City of Markham, Don River Watershed.
CFN: 57597 - Application #: 0352/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: April 4, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
21 BABY POINT CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up
to 50 sq. m (538 sq. ft) on Lot 200 - 202, Plan 1582 (YORK), (21 Baby Point Crescent), in the
City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 57728 - Application #: 0436/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
Date: April 20, 2017
202
24 WESTLEIGH CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 47, Plan 3881, (24 Westleigh Crescent), in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 57520 - Application #: 0357/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alien@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: April 4, 2017
19 CLEARSIDE PLACE
To construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or
number of dwelling units of a structure, or undertake work that does not change the footprint of
the existing structure on Lot 208, Plan M-854, (19 Clearside Place), in the City of Toronto
(Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 57712 - Application #: 0408/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 19, 2017
218 RIVERSIDE DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 196, Plan M-356, (218 Riverside Drive),
in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 57727 - Application #: 0438/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: April 19, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
20 HI MOUNT DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Lot
25, Plan M-677, (20 Hi Mount Drive), in the City of Toronto (North York Community Council
Area), Don River Watershed.
CFN: 56710 - Application #: 1022/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: April 3, 2017
203
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
3848 ELLESMERE ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 25, Plan
64R-10138, (3848 Ellesmere Road), in the City of Toronto (Scarborough Community Council
Area), Highland Creek Watershed.
CFN: 57624 - Application #: 0368/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: April 4, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
47 BERKSHIRE AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 84, Plan
M-445, (47 Berkshire Avenue), in the City of Toronto (Toronto and East York Community
Council Area), Don River Watershed.
CFN: 57547 - Application #: 0346/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: March 31, 2017
CITY OF VAUGHAN
GfiZ9407-11:400011111817*161 1:k
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 20, Plan 65M-4264, (68
Cedarpoint Crescent), in the City of Vaughan, Don River Watershed.
CFN: 57703 - Application #: 0393/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 19, 2017
41 MORAINE HILL DRIVE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 63,
Plan, (41 Moraine Hill Drive), in the City of Vaughan, Don River Watershed.
CFN: 57596 - Application #: 0358/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 12, 2017
204
TOWN OF AJAX
17 ANNIE CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 49, Plan
40M1749, (17 Annie Crescent), in the Town of Ajax, Duffins Creek Watershed.
CFN: 57584 - Application #: 0302/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 31, 2017
1011171 k, 611:11 lel a :110 [
60 JAMES STOKES COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan 65M-4456, (60 James Stokes Court), in the
Township of King, Humber River Watershed.
CFN: 57548 - Application #: 0347/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 5, 2017
37 LAVENDER VALLEY ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 36, Plan, (37
Lavender Valley Road), in the Township of King, Humber River Watershed.
CFN: 57628 - Application #: 0407/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 19, 2017
325 KING SUMMIT ROAD
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 10, 11, Plan 490, (325 King
Summit Road), in the Township of King, Humber River Watershed.
CFN: 57620 - Application #: 0373/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 11, 2017
460 WARREN ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (460 Warren
Road), in the Township of King, Humber River Watershed.
205
CFN: 57646 - Application #: 0387/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 21, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
10.6 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
and alter a watercourse, in the East Don Parkland, located at 750 Finch Avenue East,
west of Leslie Street, in the City of Toronto (North York Community Council Area), Don
River Watershed, as located on property owned by TRCA under management
agreement to the City of Toronto. The purpose is to undertake storm sewer upgrades.
Works will involve replacement of various segments of storm sewer, as well as
replacement of an outfall structure. The warm water construction timing window of July
1 to March 31 will apply to this proposal.
CFN: 56445 - Application #: 1277/16/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Daniel Brent 5774 dbrent@trca.on.ca
Date: May 2, 2017
NEW BUSINESS
RES41343/17 - WATERSHED CONDITIONS STATEMENT
Moved by: Jack Heath
Seconded by: Colleen Jordan
THAT the staff briefing on the TRCA watershed conditions, including Lake Ontario high
water levels and level of risk for flooding, as of May 5, 2017 be received.
CARRIED
TERMINATION
ON MOTION, the meeting terminated at 10:13 a.m., on Friday, May 05, 2017.
Maria Augimeri
Chair
/ks
206
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #4/17 was held at TRCA Head Office, on Friday, June 9,
2017. The Chair Maria Augimeri, called the meeting to order at 9:41 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Chris Fonseca
Member
Jennifer Innis
Member
Colleen Jordan
Member
Mike Mattos
Member
Jennifer McKelvie
Member
ABSENT
Michael Di Biase Member
Anthony Perruzza Member
RES.#B44/17 - MINUTES
Moved by: Colleen Jordan
Seconded by: Vincent Crisanti
THAT the Minutes of Meeting #3/17, held on May 5, 2017, be approved.
CARRIED
6.1 Proposed Amendments to the Conservation Authorities Act.
RES.#B45/17- CORRESPONDENCE
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THAT above -noted correspondence 6.1 be received.
CARRIED
207
Correspondence 6.1 37
SCHEDULE4
AMENDMENTS TO THE CONSERVATION AUTHORITIES ACT
I The Conservation Authorities Act is amended by adding the following section:
PART
PURPOSE AND INTE]
Purpose
0.1 The purpose of this Act is to provide for the organization and delivery of programs and services that further the
conservation, restoration, development and management of natural resources in watersheds in Ontario.
2 (1) The definitions of "administration costs" and "maintenance costs" in section 1 of the Act are repealed.
(2) Section 1 of the Act is amended by adding the following definition:
"operating expenses" include,
(a) salaries, per diems and travel expenses of employees and members of an authority,
(b) rent and other office costs,
(c) program expenses,
(d) costs that are related to the operation or maintenance of a project, but not including the project's capital costs, and
(e) such other costs as may be prescribed by regulation; ("d6penses d'exploitation")
3 The Act is amended by adding the following heading immediately before section 2:
PART H
ESTABLISHMENT OF CONSERVATION AUTHORITIES
4 Subsection 2 (4) of the Act is amended by striking out "but, where not fewer than three representatives are present
at a meeting or adjourned meeting, they may adjourn the meeting or adjourned meeting from time to time" at the
end.
5 (1) Subsection 3 (1) of the Act is amended by striking out "or adjourned meeting".
(2) Subsection 3 (5) of the Act is amended by striking out "at such rate of interest as the Minister approves".
6 (1) Subsection 4 (1) of the Act is amended by striking out the portion before clause (a) and substituting the
following:
Upper -tier municipalities
Regional municipalities to act in place of local municipalities
(1) An upper -tier municipality that was established as a regional municipality before the day subsection 6 (1) of Schedule 4
to the Building Better Communities and Conserving Watersheds Act, 2017 comes into force,
(2) Subsection 4 (2) of the Act is repealed.
7 The Act is amended by adding the following heading immediately before section 10:
PART III
ENLARGING AREAS OF JURISDICTION, AMALGAMATIONS AND DISSOLUTIONS
S Subsections 10 (LI), (2), (3) and (4) of the Act are repealed and the following substituted:
Notice of meeting
(1.1) Notice of the meeting shall be given to each participating municipality of the authority and to any municipality that is
completely or partly within the area specified under subsection (1).
Representatives
(2) Each municipality that receives notice of the meeting may appoint the number of representatives to attend the meeting
that is determined in accordance with subsection 2 (2).
Quorum
(3) At any meeting called under this section, a quorum consists of two-thirds of the representatives that the municipalities are
entitled to appoint under subsection (2).
38
Resolution
(4) At a meeting held under this section at which a quorum is present, a resolution may be passed to do all of the following:
1. Agree to enlarge the area over which the authority has jurisdiction.
2. Designate participating municipalities for the enlarged area.
3. Designate the enlarged area over which the authority has jurisdiction.
Two-thirds majority vote
(5) A resolution described in subsection (4) shall be passed by a majority of at least two-thirds of the representatives present
at the meeting.
Resolution in effect
(6) A resolution described in subsection (4) takes effect on such terms as it may specify despite anything to the contrary in
the order in council establishing the authority.
Minister's copy
(7) The municipality that called a meeting under subsection (1) shall provide the Minister with a copy of any resolution
described in subsection (4) passed at the meeting promptly after the resolution is passed.
9 (1) Subsection 11 (1) of the Act is amended by striking out "council of a municipality situated completely or partly
within the jurisdiction of one of the authorities" and substituting "council of a participating municipality of one of the
authorities".
(2) Subsection 11 (1.1) of the Act is repealed and the following substituted:
Notice of meeting
(1.I) Notice of the meeting shall be given to each participating municipality of the relevant authorities.
Public notice
(1.2) The body or bodies that call a meeting under subsection (1) shall ensure that, at least 14 days before the meeting, notice
of the meeting is,
(a) published in a newspaper having general circulation in each participating municipality, including in the electronic
version of the newspaper where available; or
(b) if there is no newspaper of general circulation in a participating municipality, posted on a website maintained by the
municipality and in at least one prominent place in the municipality.
Public representations
(1.3) No vote shall be taken on a resolution requesting amalgamation of the authorities unless members of the public have
been given an opportunity at the meeting to make representations on the issue.
(3) Subsections 11 (2) and (3) of the Act are repealed and the following substituted:
Representatives
(2) Each municipality that receives notice of the meeting may appoint the number of representatives to attend the meeting
that is determined in accordance with subsection 2 (2).
Quorum
(3) At any meeting called under this section, a quorum consists of two-thirds of the representatives that the municipalities are
entitled to appoint under subsection (2).
(4) Subsection 11 (4) of the Act is repealed and the following substituted:
Resolution
(4) At a meeting held under this section at which a quorum is present, a resolution may be passed to do all of the following:
1. Establish anew authority that has jurisdiction over areas that previously were under the separate jurisdiction of the two
or more existing authorities of the adjoining watersheds.
2. Dissolve the existing authorities.
3. Designate the participating municipalities for the new authority.
4. Designate the area over which the new authority has jurisdiction.
209
39
Two-thirds majority vote
(4.1) A resolution described in subsection (4) shall be passed by a majority of at least two-thirds of the representatives
present at the meeting.
Approval by Minister
(4.2) The authorities or the municipality who called a meeting under subsection (1) shall submit the resolution passed in
accordance with subsection (4.1) to the Minister for approval and the Minister may approve the resolution with such changes
and on such terms and conditions as he or she considers appropriate.
Resolution in effect
(43) The resolution takes effect in accordance with the terms of the resolution and the Minister's approval.
(5) Subsection 11 (5) of the Act is amended by strikiug out "Upon the establishment of a new authority and the
dissolution of the existing authorities under subsection (4)" at the beginning and substituting "When the
establishment of a new authority and the dissolution of the existing authorities take effect under subsection (4.3)".
10 (1) Section 13.1 of the Act is amended by adding the following subsection:
Public notice
(1.1) The authority that calls a meeting under subsection (1) shall ensure that, at least 14 days before the meeting, notice of
the meeting is,
(a) published in a newspaper having general circulation in each participating municipality, including in the electronic
version of the newspaper where available; or
(b) if there is no newspaper of general circulation in a participating municipality, posted on a website maintained by the
municipality and in at least one prominent place in the municipality.
(2) Subsection 13.1 (2) of the Act is amended by striking out "who were appointed by participating municipalities" at
the end.
(3) Subsections 13.1 (3) and (4) of the Act are repealed.
(4) Subsection 13.1 (7) of the Act is repealed.
11 The Act is amended by adding the following heading immediately before section 14:
PART IV
MEMBERSHIP AND GOVERNANCE
12 (1) Subsection 14 (1) of the Act is repealed and the following substituted:
Members of authority
(1) Members of an authority shall be appointed by the respective councils of the participating municipalities in the numbers
set out in subsection 2 (2) for the appointment of representatives.
(2) Subsection 14 (4) of the Act is repealed and the following substituted:
Requirements regarding composition of authority
(4) The appointment of members to an authority shall be in accordance with such additional requirements regarding the
composition of the authority and the qualification of members as may be prescribed by regulation.
Term
(4.1) A member shall be appointed for a term of up to four years, as may be determined by the council that appoints the
member.
Same
(4.2) A member's term begins at the first meeting of the authority after his or her appointment and expires immediately
before the first meeting of the authority after the appointment of his or her replacement.
Replacement of member
(4.3) Despite subsections (4.1) and (4.2), a member may be replaced by the council of the participating municipality that
appointed the member.
Reappointment
(4.4) A member is eligible to be reappointed.
13 Section 15 of the Act is amended by adding the following subsection:
210
40
Open meetings
(3) Every meeting held by the authority shall be open to the public, subject to such exceptions as may be specified in the by-
laws of the authority.
14 Subsection 17 (1) of the Act is amended by striking out "At the first meeting of an authority and thereafter at the
first meeting held in each year" at the beginning and substituting "At the fust meeting held in each year or at such
other meeting as may be specified by the authority's by-laws".
15 Subsection 18 (2) of the Act is repealed and the following substituted:
Advisory boards
(2) An authority shall establish such advisory boards as may be required by regulation and may establish such other advisory
boards as it considers appropriate.
Same
(3) An advisory board shall comply with any requirements that may be prescribed by regulation with respect to its
composition, functions, powers, duties, activities and procedures.
16 The Act is amended by adding the following section:
By-laws
19.1 (1) An authority may make by-laws,
(a) respecting the meetings to be held by the authority, including providing for the calling of the meetings and the
procedures to be followed at meetings, specifying which meetings, if any, may be closed to the public;
(b) prescribing the powers and duties of the secretary -treasurer;
(c) designating and empowering officers to sign contracts, agreements and other documents on behalf of the authority;
(d) delegating all or any of its powers to the executive committee except,
(i) the termination of the services of the secretary -treasurer,
(ii) the power to mise money, and
(iii) the power to enter into contracts or agreements other than those contracts or agreements as are necessarily
incidental to the works approved by the authority;
(e) providing for the composition of its executive committee and for the establishment of other committees that it
considers advisable and respecting any other matters relating to its governance;
(f) respecting the roles and responsibilities of the members of the authority and of its officers and senior staff;
(g) requiring accountability and transparency in the administration of the authority including,
(i) providing for the retention of records specified in the by-laws and for making the records available to the public,
(ii) establishing a code of conduct for the members of the authority, and
(iii) adopting conflict of interest guidelines for the members of the authority;
(h) respecting the management of the authority's financial affairs, including auditing and reporting on the authority's
finances;
(i) respecting the by-law review required under subsection (3) and providing for the frequency of the reviews; and
0) respecting such other matters as may be prescribed by regulation.
Conflict with other laws
(2) If a by-law made by an authority conflicts with any provision of the Municipal Conflict of Interest Act or the Municipal
Freedom of Information and Protection of Privacy Act or a provision of a regulation made under one of those Acts, the
provision of the Act or regulation prevails.
Periodic review of by-laws
(3) At such regular intervals as may be determined by by-law, an authority shall undertake a review of all of its by-laws to
ensure, amongst other things, that the by-laws are in compliance with any Act referred to in subsection (2) or any other
relevant law.
By-laws available to public
(4) An authority shall make its by-laws available to the public in the manner it considers appropriate.
211
41
Transition
(5) An authority shall make such by-laws under this section as are required for its proper administration,
(a) in the case of an authority that was established on or before the day section 16 of Schedule 4 to the Building Better
Communities and Conserving Watersheds Act, 2017 comes into force, within one year of that day; and
(b) in the case of an authority that is established after the day section 16 of Schedule 4 to the Building Better Communities
and Conserving Watersheds Act, 2017 comes into force, within one year of the day the authority is established.
Direction by Minister
(6) The Minister may give an authority a written direction to make or amend a by-law on any matter described in subsection
(1), in accordance with the direction, within such period of time as may be specified in the direction.
Compliance
(7) The authority that receives a direction under subsection (6) shall comply with the direction within the time specified in
the direction.
Regulation where failure to comply
(8) If an authority fails to adopt a by-law in accordance with the direction made under subsection (6), the Minister may make
regulations in relation to the matters set out in the direction that are applicable in the area ofjurisdiction of the authority.
Same
(9) Any regulation made by the Minister under subsection (8) prevails over any conflicting by-law that the authority may
have adopted.
17 The Act is amended by adding the following heading immediately before section 20:
PART V
OBJECTS, POWERS AND DUTIES
18 Subsection 20 (1) of the Act is amended by striking out "to establish and undertake, in the area over which it has
jurisdiction, a program designed" and substituting `to provide, in the area over which it has jurisdiction, programs
and services designed".
19 (1) Clause 21 (1) (a) of the Act is amended by striking out "a program" and substituting "programs and services".
(2) Clause 21 (1) (f) of the Act is amended by adding "or to further the authority's objects" at the end.
(3) Clause 21 (1) (m.1) of the Act is repealed.
(4) Clause 21 (1) (n) of the Act is amended by adding "and individuals" at the end.
(5) Clause 21 (1) (q) of the Act is amended by adding "or as may be desirable to further the objects of the authority"
at the end.
20 (1) The Act is amended by adding the following section:
Programs and services
21.1 (1) The following are the programs and services that an authority is required or permitted to provide within its area of
jurisdiction:
1. Mandatory programs and services that are required by regulation.
2. Municipal programs and services that the authority agrees to provide on behalf of municipalities situated in whole or in
part within its area of jurisdiction under a memorandum of understanding referred to in subsection (3).
3. Such other programs and services as the authority may determine are advisable to further its objects.
Mandatory programs and services
(2) Programs and services referred to in paragraph 1 of subsection (1) shall be provided in accordance with such standards
and requirements as may be set out in the regulations.
Memorandum of understanding with municipalities
(3) An authority may enter into a memorandum of understanding with a municipality situated in whole or in part within its
area of jurisdiction in respect of programs and services that the authority will provide on behalf of the municipality.
Periodic review of memorandum
(4) An authority and a municipality who have entered into a memorandum of understanding described in subsection (3) shall
review the memorandum at such regular intervals as may be determined by the memorandum.
212
42
Municipal programs and services
(5) Programs and services that an authority agrees to provide on behalf of a municipality shall be provided in accordance
with the terms and conditions set out in the memorandum of understanding or in such other agreement as may be entered into
by the authority and the municipality.
Consultation
(6) An authority shall carry out such consultations with respect to the programs and services it provides as may be required
by regulation and shall do so in the manner specified by regulation.
(2) Section 21.1 of the Act, as enacted by subsection (1), is amended by adding the following subsection:
Memorandum available to public
(3.1) An authority shall make a memorandum of understanding referred to in subsection (3) available to the public in such
manner as may be determined in the memorandum.
21 The Act is amended by adding the following section:
Fees for programs and services
21.2 (1) The Minister may determine classes of programs and services in respect of which an authority may charge a fee.
Publication of list
(2) The Minister shall publish the list of classes of programs and services in respect of which an authority may charge a fee
in a policy document and distribute the document to each authority.
Updating list
(3) If the Minister makes changes to the list of classes of programs and services in respect of which an authority may charge
a fee, the Minister shall promptly update the policy document referred to in subsection (2) and distribute the new document to
each authority.
Where authority may charge fee
(4) An authority may charge a fee for a program or service that it provides only if it is set out on the list of classes of
programs and services referred to in subsection (2).
Amount of fee
(5) The amount of a fee charged by an authority for a program or service it provides shall be,
(a) the amount prescribed by the regulations; or
(b) if no amount is prescribed, the amount determined by the authority.
Fee schedule
(6) Every authority shall prepare and maintain a fee schedule that sets out,
(a) the list of programs and services that it provides and in respect of which it charges a fee; and
(b) the amount of the fee charged for each program or service or the manner in which the fee is determined.
Fee policy
(7) Every authority shall adopt a written policy with respect to the fees that it charges for the programs and services it
provides, and the policy shall set out,
(a) the fee schedule described in subsection (6);
(b) the frequency within which the fee policy shall be reviewed by the authority under subsection (9);
(c) the process for carrying out a review of the fee policy, including the rules for giving notice of the review and of any
changes resulting from the review; and
(d) the circumstances in which a person may request that the authority reconsider a fee that was charged to the person and
the procedures applicable to the reconsideration.
Fee policy to be made public
(8) Every authority shall make the fee policy available to the public in a manner it considers appropriate.
Periodic review of fee policy
(9) At such regular intervals as may be determined by an authority, the authority shall undertake a review of its fee policy,
including a review of the fees set out in the fee schedule.
213
43
Notice of fee changes
(10) If, after a review of a fee policy or at any other time, an authority wishes to make a change to the list of fees set out in
the fee schedule or to the amount of any fee or the manner in which a fee is determined, the authority shall give notice of the
proposed change to the public in a manner it considers appropriate.
Reconsideration of fee charged
(11) Any person who considers that the authority has charged a fee that is contrary to the fees set out in the fee schedule, or
that the fee set out in the fee schedule is excessive in relation to the service or program for which it is charged, may apply to
the authority in accordance with the procedures set out in the fee policy and request that it reconsider the fee that was
charged.
Powers of authority on reconsideration
(12) Upon reconsideration of a fee that was charged for a program or service provided by an authority, the authority may,
(a) order the person to pay the fee in the amount originally charged;
(b) vary the amount of the fee originally charged, as the authority considers appropriate; or
(c) order that no fee be charged for the program or service.
22 The Act is amended by adding the following section:
Information required by Minister
23.1 (1) An authority shall provide the Minister with such information as the Minister may require in relation to its
operations, including the programs and services it provides.
Same
(2) The information shall be provided at the time and in the manner as the Minister may specify.
Publication
(3) If directed by the Minister to do so, an authority shall publish all or such portion of the information provided to the
Minister under subsection (1) and shall do so at the time and in the manner specified by the Minister.
23 Sections 24, 25 and 26 of the Act are repealed and the following substituted:
Projects requiring approval
24 Before proceeding with a project that involves money granted by the Minister under section 39, the authority shall file
plans and a description with the Minister and obtain his or her approval in writing.
Recovery of project capital costs
25 (1) An authority may, from time to time, determine the amount of capital costs to be incurred in connection with a project
and apportion the capital costs to the participating municipalities in accordance with the regulations.
Notice of apportionment
(2) An authority shall send a notice of apportionment in writing to each participating municipality setting out the amount of
the capital costs for a project that has been apportioned to the participating municipality.
Payment of apportioned amount
(3) Each participating municipality shall pay to the authority the portion of the capital costs for a project that is specified in
the notice of apportionment in accordance with the requirements set out in the notice and with this section.
How money to be raised
(4) Each participating municipality may issue debentures to provide financing for the capital costs for a project of an
authority.
Where money raised over several years
(5) If the notice of apportionment requires a municipality to raise its portion of the capital costs for a project over a period of
two or more years, the municipality shall, within 30 days of receiving the notice of apportionment, give the authority written
notice of how it will pay its portion of the capital costs.
Debt due
(6) The amount of the portion of the capital costs for a project that is specified in a notice of apportionment sent to a
participating municipality is a debt due by the participating municipality to the authority and may be enforced by the
authority as such.
214
44
Review of apportionment of capital costs
26 (1) Any participating municipality that receives a notice of apportionment under section 25 may, within 30 days after
receiving the notice of apportionment, apply to the Ontario Municipal Board, or to such other body as may be prescribed by
regulation, for a review of the apportionment among the participating municipalities of the capital costs for the relevant
project.
Same
(2) The participating municipality that makes an application under subsection (1) shall send a copy of the notice of
application to the authority and to every other participating municipality of the authority.
Hearing
(3) The Ontario Municipal Board, or such other body as may be prescribed by regulation, shall hold a hearing to reconsider
the apportionment of capital costs among the participating municipalities, including considering whether the apportionment
complies with section 25 and the regulations and whether the portion apportioned to the municipality is otherwise
appropriate.
Parties
(4) The parties to the hearing are the applicant municipality, the authority, any other participating municipality of the
authority that requests to be a party, and such other persons as the Ontario Municipal Board, or such other body as may be
prescribed by regulation, may determine.
Requirement to pay costs stayed
(5) A participating municipality that makes an application under this section is not required to pay the portion of the capital
costs that was apportioned to the municipality under the notice of apportionment until the determination of the application.
Delay of notice
(6) A participating municipality that makes an application under this section is not required to give notice under subsection
25 (5) until 30 days after the final determination of the application.
Powers on hearing
(7) Upon hearing an application under this section, the Ontario Municipal Board, or such other body as may be prescribed by
regulation, may confirm or vary the apportionment of the capital costs by the authority among the participating
municipalities.
Decision final
(8) A decision under subsection (7) is final.
24 (1) Section 27 of the Act is repealed and the following substituted:
Recovery of operating expenses
27 (1) Every year an authority shall determine its operating expenses for the subsequent year and apportion those expenses to
the participating municipalities in accordance with the regulations.
Fixed portion for some municipalities
(2) Despite subsection (1) and subject to the regulations, an authority may establish a fixed minimal amount as the portion of
the authority's operating expenses that a participating municipality is required to pay each year, and may apportion that
amount to the municipality instead of the portion determined under subsection (1) in any year in which the fixed minimal
amount exceeds the portion determined under subsection (1).
Notice of apportionment
(3) An authority shall send a notice of apportionment in writing to each participating municipality setting out the amount of
the operating expenses that has been apportioned to the participating municipality.
Collection as taxes
(4) Each participating municipality shall collect the amount apportioned to it in the same manner as municipal taxes for
general purposes and shall remit the amount collected to the authority.
Debt due
(5) The amount of the portion of the operating expenses specified in a notice of apportionment sent to a participating
municipality is a debt due by the participating municipality to the authority and may be enforced by the authority as such.
215
45
Review of apportionment of operating expenses
27.1 (1) Any participating municipality that receives a notice of apportionment under section 27 may, within 30 days of
receiving the notice, apply to the Mining and Lands Commissioner, or to such other body as may be prescribed by regulation,
for a review of the apportionment of the operating expenses.
Same
(2) The participating municipality that makes an application under subsection (1) shall send a copy of the notice of
application to the authority and to every other participating municipality of the authority.
Hearing
(3) The Mining and Lands Commissioner, or such other body as may be prescribed by regulation, shall hold a hearing to
reconsider the apportionment of the operating expenses, including considering whether the apportionment complies with
section 27 and the regulations and whether the portion apportioned to the municipality is otherwise appropriate.
Parties
(4) The parties to the hearing are the applicant municipality, the authority, any other participating municipality of the
authority that requests to be a party and such other persons as the Mining and Lands Commissioner, or such other body as
may be prescribed by regulation, may determine.
No stay
(5) The appellant municipality shall comply with the notice of apportionment pending the determination of the application.
Powers on hearing
(6) Upon hearing an application under this section, the Mining and Lands Commissioner, or such other body as may be
prescribed by regulation, may confirm or vary the apportionment of the operating expenses by the authority among the
participating municipalities and may order participating municipalities to pay such portion of the operating expenses as it
determines.
Decision final
(7) A decision under subsection (6) is final.
(2) Section 27.1 of the Act, as enacted by subsection (1), is amended by striking out "Mining and Lands
Commissioner" wherever it appears and substituting in each case "Mining and Lands Tribunal".
25 Section 28 of the Act is repealed and the following substituted:
PART VI
REGULATION OF AREAS OVER WHICH AUTHORITIES HAVE JURISDICTION
Prohibited activities re watercourses, wetlands, etc.
28 (1) Subject to subsections (2) and (3) and section 28. 1, no person shall carry on the following activities,or permit another
person to carry on the following activities, in the area of jurisdiction of an authority:
1. Activities to straighten, change, divert or interfere in any way with the existing channel of a river, creek, stream or
watercourse or to change or interfere in any way with a wetland.
2. Development activities in areas that are within the authority's area of jurisdiction and are,
i. hazardous lands,
ii. wetlands,
iii. river or stream valleys the limits of which shall be determined in accordance with the regulations,
iv. areas that are adjacent or close to the shoreline of the Great Lakes -St. Lawrence River System or to an inland lake
and that may be affected by flooding, erosion or dynamic beach hazards, such areas to be further determined or
specified in accordance with the regulations, or
v. other areas in which development should be prohibited or regulated, as may be determined by the regulations.
Exception, aggregates
(2) The prohibitions in subsection (1) do not apply to an activity approved under the Aggregate Resources Act after
December 18, 1998, the date the Red Tape Reduction Act, 1998 received Royal Assent.
Same, prescribed activities
(3) The prohibitions in subsection (1) do not apply to an activity or a type of activity that is prescribed by regulation and is
carried out in accordance with the regulations.
216
46
Same, prescribed areas
(4) The prohibitions in subsection (1) do not apply to any activity described in that subsection if it is carred out,
(a) in an area that is within an authority's area of jurisdiction and specified in the regulations; and
(b) in accordance with any conditions specified in the regulations.
Definitions
(5) In this section,
"development activity" means a development activity as defined by regulation; ("activit6 d'amenagement")
"hazardous land" means hazardous land as defined by regulation; ("terrain dangereux")
"watercourse" means a watercourse as defined by regulation; ("cours d'eau")
"wetland" means a wetland as defined by regulation. ("terre marecageuse")
Permits
28.1 (1) An authority may issue a permit to a person to engage in an activity specified in the permit that would otherwise be
prohibited by section 28.
Application for permit
(2) A person who wishes to engage in an activity that is prohibited under section 28 in an area situated in the jurisdiction of
an authority may apply to the authority for a permit under this section.
Same
(3) An application for a permit shall be made in accordance with the regulations and include such information as is required
by regulation.
Power to refuse, etc.
(4) Subject to subsection (5), the authority may attach conditions to a permit or refuse to issue a permit if, in the authority's
opinion,
(a) the activity is likely to create conditions or circumstances that, in the event of a natural hazard, might jeopardize the
health or safety of persons or result in the damage or destruction of property;
(b) the activity is likely to affect the control of flooding, erosion, dynamic beaches or pollution or the conservation of
land; or
(c) any circumstances as may be prescribed by regulation exist.
Hearing
(5) An authority shall not refuse an application for a permit or attach conditions to a permit unless the applicant for the
permit has been given an opportunity to be heard by the authority.
Additional criteria, renewable energy projects
(6) Despite subsection (4), in the case of an application for a permit to engage in development related to a renewable energy
project as defined in subsection 1 (1) of the Green Energy Act, 2009,
(a) the authority shall not refuse the permit unless it is of the opinion that it is necessary to do so to control pollution,
flooding, erosion or dynamic beaches; and
(b) the authority shall not impose conditions on the permit unless the conditions relate to controlling pollution, flooding,
erosion or dynamic beaches.
Reasons for decision
(7) If the authority, after holding a hearing, refuses a permit or issues the permit subject to conditions, the authority shall
give the applicant written reasons for the decision.
Appeal
(8) An applicant who has been refused a permit or who objects to conditions imposed on a permit may, within 30 days of
receiving the reasons under subsection (7), appeal to the Minister who may,
(a) refuse the permit; or
(b) order the authority to issue the permit, with or without conditions.
Definition
(9) In this section,
217
47
"pollution" means pollution as defined by regulation.
Period of validity
28.2 A permit shall be valid for a period to be determined in accordance with the regulations.
Cancellation of permits
28.3 (1) An authority may cancel a permit issued under section 28.1 if it is of the opinion that the conditions of the permit
have not been met or that the circumstances that are prescribed by regulation exist.
Notice
(2) Before cancelling a permit, an authority shall give a notice of intent to cancel to the permit holder indicating that the
permit will be cancelled on a date specified in the notice unless the holder requests a hearing under subsection (3).
Request for hearing
(3) Within 15 days of receiving a notice of intent to cancel a permit from the authority, the permit holder may submit a
written request for a hearing to the authority.
Hearing
(4) The authority shall set a date for the hearing and hold the hearing within a reasonable time after receiving a request for a
hearing.
Power
(5) After a hearing, the authority may confirm, rescind or vary the decision to cancel a permit.
Delegation of power
28.4 An authority may delegate any of its powers relating to the issuance or cancellation of permits under this Act or the
regulations, or to the holding of hearings in relation to the permits, to the authority's executive committee or to any other
person or body, subject to any limitations or requirements that may be prescribed by regulation.
26 The Act is amended by adding the following section:
Regulations: activities affecting natural resources
28.5 (1) The Lieutenant Governor in Council may make regulations with respect to activities that may impact the
conservation, restoration, development or management of natural resources and that may be carried out in the areas of
jurisdiction of authorities, including regulations,
(a) identifying activities that have or may have an impact on the conservation, restoration, development or management of
natural resources for the purposes of the regulation;
(b) regulating those activities;
(c) prohibiting those activities or requiring that a person obtain a permit from the relevant authority to engage in the
activities in the authority's area of jurisdiction.
Same
(2) A regulation under clause (1) (c) that requires that a person obtain a permit from the relevant authority to engage in an
activity described in subsection (1) may,
(a) provide for applications to be made to an authority for the permit and specify the manner, content and form of the
application;
(b) provide for the issuance, expiration, renewal and cancellation of a permit;
(c) require hearings in relation to any matter referred to in clauses (a) and (b) and specify the person before whom, or the
body before which, the matter shall be heard, provide for notices and other procedural matters relating to the hearing
and provide for an appeal from any decision.
Same
(3) A regulation made under this section may be limited in its application to one or more authorities or activities.
27 (1) Subsection 29 (1) of the Act is amended by striking out the portion before clause (a) and substituting the
following:
Regulations: public use of authority's property
(1) The Minister may make regulations with respect to land and other property owned by authorities including regulations,
(2) Subsections 29 (1.1), (1.2) and (2) of the Act are repealed and the following substituted:
218
48
Same
(2) A regulation made under this section may be limited in its application to one or more authorities.
28 Sections 30 and 30.1 of the Act are repealed and the following substituted:
PART VII
ENFORCEMENT AND OFFENCES
Appointment of officers
30 An authority may appoint officers for the purposes of ensuring compliance with the Act and the regulations.
Entry without warrant
30.1 (1) An officer appointed by an authority under section 30 may, subject to subsections (2) and (3), enter any land
situated in the authority's area of jurisdiction for the purposes of determining compliance with subsection 28 (1), a regulation
made under subsection 28 (3) or section 28.5 or with the conditions of a permit issued under section 28.1 or under a
regulation made under clause 28.5 (1) (c).
No entry to buildings
(2) The power to enter land under subsection (1) does not authorize the entry into a dwelling or other building situated on the
land.
Time of entry
(3) The power to enter land under subsection (1) may be exercised at any reasonable time.
Power upon entry
(4) An officer who enters land under subsection (1) may do any of the following things:
1. Inspect any thing that is relevant to the inspection.
2. Conduct any tests, take any measurements, take any specimens or samples, set up any equipment and make any
photographic or other records that may be relevant to the inspection.
3. Ask any questions that are relevant to the inspection to the occupant of the land.
No use of force
(5) Subsection (1) does not authorize the use of force.
Experts, etc.
(6) An officer who enters land under this section may be accompanied and assisted by any person with such knowledge,
skills or expertise as may be required for the purposes of the inspection.
Searches
Search with warrant
30.2 (1) An officer may obtain a search warrant under Part VIII of the Provincial Offences Act in respect of an offence
under this Act.
Assistance
(2) The search warrant may authorize any person specified in the warrant to accompany and assist the officer in the
execution of the warrant.
Search without warrant
(3) If an officer has reasonable grounds to believe that there is something on land that will afford evidence of an offence
under this Act but that the time required to obtain a warrant would lead to the loss, removal or destruction of the evidence,
the officer may, without warrant, enter and search the land.
No entry to buildings
(4) The power to enter land under subsection (3) does not authorize the entry into a dwelling or other building situated on the
land.
Stop order
30.3 (1) An officer appointed under section 30 may make an order requiring a person to stop engaging in or not to engage in
an activity if the officer has reasonable grounds to believe that the person is engaging in the activity, has engaged in the
activity or is about to engage in the activity and, as a result, is contravening,
(a) subsection 28 (1) or a regulation made under subsection 28 (3) or under section 28.5; or
(b) the conditions of a permit that was issued under section 28.1 or under a regulation made under clause 28.5 (1) (c).
219
49
Information to be included in order
(2) The order shall,
(a) specify the provision that the officer believes is being, has been or is about to be contravened;
(b) briefly describe the nature of the contravention and its location; and
(c) state that a hearing on the order may be requested in accordance with this section.
Service of order
(3) An order under this section shall be served personally or by registered mail addressed to the person against whom the
order is made at the person's last known address.
Registered mail
(4) An order served by registered mail shall be deemed to have been served on the fifth day after the day of mailing, unless
the person served establishes that the person did not, acting in good faith, through absence, accident, illness or other cause
beyond the person's control, receive the order until a later date.
Effective date
(5) An order under this section takes effect when it is served, or at such later time as is specified in the order.
Right to hearing
(6) A person who is served with an order under this section may request a hearing before the authority or, if the authority so
directs, before the authority's executive committee, by mailing or delivering to the authority, within 30 days after service of
the order, a written request for a hearing that includes a statement of the reasons for requesting the hearing.
Powers of authority
(7) After holding a hearing, the authority or executive committee, as the case may be, shall,
(a) confirm the order;
(b) amend the order; or
(c) remove the order, with or without conditions.
Reasons for decision
(8) The authority or executive committee, as the case may be, shall give the person who requested the hearing written
reasons for the decision.
Appeal
(9) Within 30 days after receiving the reasons mentioned in subsection (8), the person who requested the hearing may appeal
to the Minister and, after reviewing the submissions, the Minister may,
(a) confirm the order;
(b) amend the order; or
(c) remove the order, with or without conditions.
Offences
30.4 (1) Every person is guilty of an offence if he or she contravenes,
(a) subsection 28 (1) or a regulation made under subsection 28 (3) or under section 28.5;
(b) the conditions of a permit that was issued under section 28.1 or under a regulation made under clause 28.5 (1) (c); or
(c) a stop order issued under section 30.3.
Penalty
(2) A person who commits an offence under subsection (1) is liable on conviction,
(a) in the case of an individual,
(i) to a fine of not more than $50,000 or to a term of imprisonment of not more than three months, or to both, and
(ii) to an additional fine of not more than $10,000 for each day or part of a day on which the offence occurs or
continues; and
(b) in the case of a corporation,
(i) to a fine of not more than $1,000,000, and
220
50
(ii) to an additional fine of not more than $200,000 for each day or part of a day on which the offence occurs or
continues.
Monetary benefit
(3) Despite the maximum fines set out in clauses (2) (a) and (b), a court that convicts a person of an offence under clause (1)
(a) or (b) may increase the fine it imposes on the person by an amount equal to the amount of the monetary benefit that was
acquired by the person, or that accrued to the person, as a result of the commission of the offence.
Contravening s. 29 regulations
(4) Every person who contravenes a regulation made under section 29 is guilty of an offence and on conviction is liable to a
fine of not more than $1,000.
Obstruction of officer
(5) Every person who prevents or obstructs an officer from entering land under section 30.1 or 30.2 is guilty of an offence
and on conviction is liable to a fine of not more than $10,000.
Limitation period
30.5 A proceeding shall not be commenced with respect to an offence under subsection 30.4 (1), (4) or (5) more than two
years after the day on which the offence first comes to the attention of an officer appointed under section 30.
Rehabilitation orders
30.6 (1) In addition to any other remedy or penalty provided by law, the court, upon convicting a person of an offence under
clause 30.4 (1) (a) or (b), may order the convicted person to,
(a) remove, at the convicted person's expense, any development within such reasonable time as the court orders; and
(b) take such actions as the court directs, within the time the court may specify, to repair or rehabilitate the damage that
results from or is in any way connected to the commission of the offence.
Non-compliance with order
(2) If a person does not comply with an order made under subsection (1), the authority having jurisdiction may arrange for
any removal, repair or rehabilitation that was required of a person under subsection (1) to be carried out.
Liability for certain costs
(3) The person to whom an order is made under subsection (1) is liable for the cost of any removal, repair or rehabilitation
arranged by an authority under subsection (2), and the amount is recoverable by the authority by action in a court of
competent jurisdiction.
29 The Act is amended by adding the following heading immediately before section 31:
PART VIII
MATTERS RELATING TO LAND AND WATER USE
30 The Act is amended by adding the following heading immediately before section 36:
PART IX
MISCELLANEOUS
31 Section 37 of the Act is repealed and the following substituted:
Spending by authority
37 All money that is paid to an authority for specified purposes under this Act may be spent by the authority as it considers
proper.
32 (1) Section 40 of the Act is repealed and the following substituted:
Regulations, Lieutenant Governor in Council
40 (1) The Lieutenant Governor in Council may make regulations,
(a) governing the composition of conservation authorities and prescribing additional requirements regarding the
appointment and qualifications of members of conservation authorities;
(b) governing advisory boards established under subsection 18 (2), including requiring authorities to establish one or more
advisory boards and prescribing requirements with respect to the composition, functions, powers, duties, activities and
procedures of any advisory board that is established;
(c) governing programs and services provided by authorities under paragraph 1 of subsection 21.1 (1), requiring
authorities to provide those programs and services and respecting standards and requirements applicable to those
programs and services;
221
51
(d) governing the apportionment of an authority's capital costs in connection with a project for the purposes of section 25;
(e) governing reviews under sections 26 and 27. 1, including prescribing a body that may conduct such reviews instead of
the Ontario Municipal Board or the Mining and Lands Commissioner, as the case may be;
(f) governing the apportionment of an authority's operating expenses for the purposes of section 27, prescribing expenses
as operating expenses for the purposes of section 27, governing the amount that participating municipalities are
required to pay under section 27, including the fixed amount that a participating municipality may be required to pay
under subsection 27 (2), and restricting and prohibiting the apportionment of certain types of operating expenses;
(g) defining any term that is used in this Act and that is not defined in this Act;
(h) respecting anything that is necessary or advisable for the proper administration of this Act.
Same
(2) The standards and requirements established for programs and services in a regulation made under clause (1) (c) may
include standards and requirements to mitigate the impacts of climate change and provide for adaptation to a changing
climate, including through increasing resiliency.
Regulations, Minister
(3) The Minister may make regulations,
(a) prescribing matters that may be the subject of by-laws made under clause 19.1 (1) 0);
(b) respecting the amount of any fee that may be charged by an authority in relation to a program or service, including
determining the manner in which the fee is calculated;
(c) governing consultations that an authority must carry out for the purposes of subsection 21.1 (6);
(d) governing the information that authorities must provide to the Minister under section 23. 1, including the publication of
that information;
(e) governing the prohibitions set out in section 28, including,
(i) prescribing the limits on river and stream valleys for the purposes of subparagraph 2 iii of subsection 28 (1),
(ii) determining or specifying areas for the purposes of subparagraph 2 iv of subsection 28 (1),
(iii) determining areas in which development should be prohibited or regulated for the purposes of subparagraph 2 v
of subsection 28 (1),
(iv) prescribing activities or types of activities to which the prohibitions set out in subsection 28 (1) do not apply and
respecting the manner or circumstances in which the activities or types of activities may be carried out and any
conditions or restrictions that apply to the activity or type of activity,
(v) prescribing areas in which the prohibitions set out in subsection 28 (1) do not apply and respecting the manner or
circumstances in which the activities may be carred out in such areas and any conditions or restrictions that
apply to carrying out activities in such areas,
(vi) defining "development activity", "hazardous land", "watercourse" and "wetland" for the purposes of section 28;
(f) governing the issuance of permits under section 28.1, including applications for the permits, prescribing conditions
that may be attached to apermit or circumstances in which a permit may be refused under subsection 28.1 (4) or
cancelled under section 28.3 and respecting the period for which a permit is valid;
(g) defining "pollution" for the purposes of the Act;
(h) governing the delegation of powers by an authority under section 28.4 and prescribing any limitations or requirements
related to the delegation.
(2) Clause 40 (1) (e) of the Act, as enacted by subsection (1), is amended by striking out "Mining and Lands
Commissioner" and substituting "Mining and Lands Tribunal".
33 The Act is amended by adding the following section:
Rolling incorporations
41 A regulation made under this Act that adopts a document by reference may adopt the document as it may be amended
from time to time after the regulation is made.
222
52
Commencement
34 (1) Subject to subsection (2), this Schedule comes into force on the day it receives Royal Assent.
(2) Sections 2, 13 and 16, subsections 19 (3) and 20 (2) and sections 21, 23, 24, 25, 26, 27, 28 and 32 come into force on
a day to be named by proclamation of the Lieutenant Governor.
223
Section I — Items for Authority Action
RES.#646/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Poetry Living (The View II) Limited, CFN 57887. Acquisition of property
located east of Pine Valley Drive and north of Major Mackenzie Drive, in the
City of Vaughan, Regional Municipality of York, under the "Greenlands
Acquisition Project for 2016-2020," Flood Plain and Conservation
Component, Humber River watershed.
Moved by: Vincent Crisanti
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 13.7644 hectares (34.0125 acres),
more or less, of vacant land, located east of Pine Valley Drive and north of Major
Mackenzie Drive, said land being Part of Lot 22, Concession 8 designated as Parts 29, 30
and 31 on draft Plan of Subdivision, prepared by Krcmar, Drawing Name 00-183MPI1,
dated January 20, 2017 in the City of Vaughan, Regional Municipality of York, be
purchased from Poetry Living (The View II) Limited;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Vania Ottobergo, Director, Holborn Group acting as
agent for the owners.
Access to the subject lands will be achieved through a temporary easement across Blocks 32 and
33 on the draft Plan of Subdivision from their frontage on Pine Valley Drive.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Zoning By-law Amendment Application Z.08.017, Draft Plan of Subdivision
Application 19T -08V01 for residential development, TRCA staff established the limits of the open
space land.
224
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(a)trca.on.ca, jtruesdell(a)trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(aDtrca.on.ca, jtruesdell(cDtrca.on.ca
Date: June 9, 2017
Attachments: 1
225
Attachment 1
G
tHumpat�t-�
I
Legend
L�
J�
1
Subject
Property
3
Toronto and Fegion
Conservation
%ar The Living City -
L
PEEL
YORK
RES.#B47/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Waterfront Component, Scarborough Sector
Marcia Gray, CFN 56360. Acquisition of property located west of Morna
Avenue and south of Guildwood Parkway, municipally known as 461
Guildwood Parkway, in the City of Toronto (Scarborough Community
Council Area), under the "Greenlands Acquisition Project for 2016-2020,"
Waterfront Component, Scarborough Sector.
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.06 hectares (0.14 acres), more or
less, of land improved with a one storey single family residence, located west of Morna
Avenue and south of Guildwood Parkway, said land being Part of Lot 2, Registered Plan
2413 being Part 5, Plan of Reference 64111-11987, City of Toronto, municipally known as 461
Guildwood Parkway, in the City of Toronto be purchased from Marcia Gray;
THAT the purchase price be $755,000.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
THAT acquisition by TRCA is conditional on all necessary funding being available;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Ms. Diane Gray, the daughter and power of attorney for
the owner, Ms. Marcia Gray.
Initial negotiations commenced in the early 2000's as a result of soil monitoring studies. The
owner's Last Will and Testament stipulated her desire to sell the subject land to TRCA; Diane
Gray contacted Property and Risk Management staff in July of 2016 to express her mother's
interests in selling the property to TRCA and the desire to commence negotiation at that time.
Access to the subject lands will be achieved through its frontage on 461 Guildwood Parkway.
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Lake Ontario
Waterfront as outlined in the approved Greenlands Acquisition Project for 2016-2020.
227
The subject property is entirely within the regulated area. The property is located between an
existing community parkette and a TRCA-owned rental home located at 463 Guildwood Parkway
that is currently vacant. The rental home is nearing a point in its useful life where significant capital
reinvestment would be required to continue as a viable and profitable asset within TRCA's rental
portfolio. Staff is currently undertaking a cost/benefit analysis for the capital reinvestment.
The proposed acquisition at 461 Guildwood Parkway provides TRCA with a unique opportunity to
consolidate an important block of parkland along the Scarborough Bluffs into public ownership.
This consolidation would allow for the expansion and enhancement of an existing community
parkette, as well as allow for greater public access and enjoyment of the Scarborough Bluffs.
Based on preliminary assessment by TRCA staff, the subject property is affected by super
saturation and surface runoff over the slope of the bluffs which has increased soil instability and
resulted in at least 16 landslides along the Scarborough Bluffs since April 2017. With two
significant slides along Guildwood Parkway and the close proximity of private property to the bluff
crest, TRCA is retaining Terraprobe Inc. to update the long-term stable slope crest position for this
sector to help guide prioritization and planning of acquisition and remedial works. Terraprobe
Inc. has undertaken numerous geotechnical assessments along Guildwood Parkway as far back
as 1987 and most recently in 2016 as part of the Scarborough Waterfront Project. The
assessment will be undertaken using 2016 LIDAR data coupled with slope crest position updates
obtained from the Erosion Management group's annual bluff monitoring program. Results of the
assessment for 461 Guildwood are expected by June 12, 2017.
The purchase price of the subject property is based on an appraisal prepared by D. Bottero and
Associates Limited for TRCA on August 22, 2016.
TAXES AND MAINTENANCE
The dwelling will be demolished and this parcel of land will be turned over to the City of Toronto
under the terms of the existing management agreement.
FINANCIAL DETAILS
A portion of the funds for the costs related to this purchase are available in the TRCA land
acquisition capital account. Subject to the results of the assessment currently being undertaken
by Terraprobe Inc., the remainder of the funds will be from the enhanced capital funding for critical
erosion sites from the City of Toronto.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(a)trca.on.ca
For Information contact: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(a)_trca.on.ca, jtruesdeII@trca.on.ca
Date: June 9, 2017
Attachments: 1
228
Subject
Property
/ Lake Ontario
Legend Toronto and Region
0 Conservation
for The Living City
L J SITE
TORONTO
i.xe o�nno
RES.#B48/17 - CITY OF TORONTO
Request for a Stratified Permanent Easement Required for Access to
Subsurface Infrastructure
City of Toronto, Don River Watershed, CFN 57864. Receipt of a request
from the City of Toronto to provide a stratified permanent easement for
access to City of Toronto subsurface infrastructure, located south of
Graydon Hall Drive and west of Don Mills Road, municipally known as 1955
Don Mills Road, City of Toronto, North York Community Council Area, Don
River watershed.
Moved by: Vincent Crisanti
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from the City of Toronto to
provide a stratified permanent easement for access to subsurface infrastructure, located
south of Graydon Hall Drive and west of Don Mills Road, municipally known as 1955 Don
Mills Road, City of Toronto (North York Community Council Area), Don River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Toronto in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of
0.015 hectares (0.04 acres), more or less, be granted to the City of Toronto, said land being
Parcel F-3, Section M960 Firstly: Pt Blks F & G, Plan 66M960 as closed by By -Law 33-80,
being Parts 5, 6 & 7 66R11579; Subject to Easement in Favour of The Corporation of the
Township of North York over Part 6 Plan 66R-11579 as in A100497; Secondly: Part Bilks F
& G on Plan 66M-960 as Parts 8, 9, 10, 11 & 12 Plan 66R-1159; Subject To Easement in
Favour of the Corporation of the Township of North York over Part 9, Plan 66R-1159 As In
Al 00497, as shown on Parts 14, 15, 16 on Draft Plan created by J.D. Barnes under Ref. No.
13-15-012-02 on April 21, 2017, Township of York/North York; City of Toronto, be conveyed
to the City of Toronto;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs are to
be paid by the City of Toronto;
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from the
granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of City of Toronto prior to any
disturbance of TRCA lands;
THAT all TRCA lands disturbed by any proposed works be revegetated/stabilized
following construction and, where deemed appropriate by TRCA staff, a landscape plan be
prepared for TRCA review and approval in accordance with existing TRCA landscaping
guidelines;
230
THAT said easement be subject to the approval of the Minister of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
At Authority Meeting #9/16, Resolution #A197/16 granted a permanent easement in favour of The
Residences at Argento Inc. for subsurface infrastructure.
As a result of this new privately -owned infrastructure, the City of Toronto has requested a
stratified permanent easement across TRCA-owned lands required to access their existing
subsurface infrastructure, located south of Graydon Hall Drive and west of Don Mills Road,
municipally known as 1955 Don Mills Road in the City of Toronto, Don River watershed.
The subject TRCA-owned lands were acquired from the Municipality of Metropolitan Toronto, on
July 3, 1980, under the Don River Flood Plain Land Component of the Land Acquisition Project.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by
TRCA staff, revegetated with native woody and herbaceous plant material in accordance
with existing TRCA landscaping guidelines. A landscape plan will be prepared as part of
the permit application submission.
Attached is a sketch illustrating the location of the subject lands.
FINANCIAL DETAILS
City of Toronto has agreed to assume all legal, survey and other costs involved in completing this
transaction.
Report prepared by: Brandon Hester, extension 5767
Emails: bhester(&-trca.on.ca
For Information contact: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(&trca.on.ca, jtruesdell(dtrca.on.ca
Date: June 9, 2017
Attachments: 1
231
Attachment 1
Perman nt
Ea nt
l
s
i
Legend
L�
Toronto and Region
Conservation
16t The Living, City
-
L„"
RES.#B49/17 - REGION OF PEEL
Requirement from the Region of Peel for Conveyance of Toronto and
Region Conservation Authority -owned Lands and a Permanent Easement
Required for Road Widening and Associated Traffic Light Infrastructure
City of Brampton, Region of Peel, Humber River Watershed, CFN 57971.
As part of the redevelopment of the Claireville Water Park (Site Plan
Revision File: SP16-063-000) the Region of Peel requires the granting of
a permanent easement and conveyance of Toronto and Region
Conservation Authority -owned lands, located east of Finch Avenue and
south of Steeles Avenue, in the City of Brampton, Region of Peel, for the
future widening of Finch Avenue (Regional Road 2) and associated traffic
light infrastructure, Humber River watershed.
Moved by: Vincent Crisanti
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) has been requested to grant a permanent easement and
convey lands east of Finch Avenue, south of Steeles Avenue, in the City of Brampton,
Region of Peel, to the Region of Peel for the future widening of Finch Avenue and
associated traffic light infrastructure, Humber River watershed;
AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in
furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to
cooperate with Region of Peel in this instance;
THEREFORE LET IT BE RESOLVED THAT a parcel of TRCA-owned land containing
0.1657 hectares (0.4094 acres), more or less, required for the future widening of Finch
Avenue, including a 0.3m reserve, said land being Part of Lots 15, Concession 9, East of
Hurontario Street, and designated as Parts 1 to 4, and 6 to 14 inclusive, on the Draft Plan
of Survey, prepared by NA Geomatics Inc, File No. 16-7082-CH1, be conveyed to the
Region of Peel;
THAT a permanent easement containing 0.0476 hectares (0.1176 acres), more or less, be
granted to the Region of Peel for traffic light infrastructure, said land being Part of Lots
14 and 15, Concession 9, East of Hurontario Street, and designated as Part 5 on the Draft
Plan of Survey, prepared by NA Geomatics Inc, File No. 16-7082-CH1;
THAT consideration be the nominal sum of $2.00. All legal, survey and other costs are to
be paid by TRCA;
THAT said conveyance and grant of the permanent easement be subject to approval of
the Ministry of Natural Resources and Forestry in accordance with Section 21(2) of the
Conservation Authorities Act, R.S.O. 1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
233
BACKGROUND
As a result of the redevelopment of the Claireville Water Park (Site Plan Revision File: SP16-
063-000) the Region of Peel has required the conveyance of TRCA-owned lands of 0.1657
hectares (0.4094 acres) and a permanent easement of 0.0476 hectares (0.1176 acres), located
east of Finch Avenue and south of Steeles Avenue, required for the future widening of Finch
Avenue (Regional Road 2) including a 0.3m reserve and associated traffic light infrastructure, in
the City of Brampton, Region of Peel, Humber River watershed.
The Region of Peel's road widening requirements for mid -block are 18m from the centreline of
Finch Avenue. The Region of Peel also requires the dedication of a 15m x 15m daylight triangle
at the intersection of Steeles Avenue East and Finch Avenue and a dedication of a 0.3m
reserve along the frontage of Finch Avenue behind the property line and daylight triangle.
An archeological investigation will be carried out and completed at the expense of TRCA, prior
to the land being conveyed to the Region of Peel.
The subject lands were acquired by TRCA from Canadian National Railways on December 19,
1961 and from N.S Lindsay (Estate) on May 1, 1962 for the Claireville Dam and Reservoir
Acquisition Project, Humber River watershed.
Attached is a sketch illustrating the location of the subject lands and permanent easement.
FINANCIAL DETAILS
As a condition of the redevelopment of the Claireville Water Park (Site Plan Revision File:
SP16-063-000) TRCA is responsible for the conveyance of lands for the future widening of
Finch Avenue. All legal, survey, archeological and other costs to complete the transaction are to
be paid by TRCA.
Report prepared by: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(@trca.on.ca, jtruesdell(cttrca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwellsptrca.on.ca, jtruesdell(&trca.on.ca
Date: May 23, 2017
Attachments: 1
234
L�
1
1 r9iL
Subject Widening
and Reserve
�t, z
Legend
Permanent
zEasement
Toronto and Region
Conservation
16t The Living, City
Subject Widening
and Reserve
L,
RES.#B50/17 - LAKEVIEW WATERFRONT CONNECTION PROJECT
Design Build of Automated Gate Entry and Revenue Tracking System.
Award of Contract #10003420 to complete engineering and construction
services for an automated gate entry and revenue tracking system for the
Lakeview Waterfront Connection Project, in the City of Mississauga.
Moved by: Vincent Crisanti
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract #10003420 to complete
engineering and construction services for an Automated Gate Entry and Revenue
Tracking System for the Lakeview Waterfront Connection Project, in the City of
Mississauga be awarded to Precise ParkLink inc. at a total cost not to exceed $544,751.00,
plus HST, as they are the lowest bidder that best meets Toronto and Region Conservation
Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 10%
of the contract cost as a contingency allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take such action as is
necessary to implement the contract, including obtaining any required approvals and the
signing and execution of documents.
CARRIED
BACKGROUND
The Lakeview Waterfront Connection Project (LWC Project), led by the Regional Municipality of
Peel (RoP) and Credit Valley Conservation (CVC), with assistance from Toronto and Region
Conservation Authority (TRCA) and the City of Mississauga (City), will create a new natural
waterfront park amenity along the eastern Mississauga waterfront. The LWC Project will be
located on the shores of Lake Ontario and will overlap with the beach at Marie Curtis Park West in
the northeast, and on the southwest, by Ontario Power Generation's eastern pier at their former
Lakeview Power Generating Site.
It is estimated that a total of 200,000 truckloads of earth fill and concrete rubble material will be
required to complete the project, with an average of approximately 200 trucks entering the site on
a daily basis. In addition, project staff, heavy equipment and service vehicles will require site entry
access throughout the duration of construction activities. The project commenced construction in
August 2016 with an anticipated completion date of 2024. Materials imported for the construction
of the waterfront park amenity will also include purchased quarry rock for shoreline protection.
Presently, staff inspect trucks entering the site and manually tabulate each truckload received on
site for project reporting and auditing purposes. In order to make this a more efficient process and
to reduce staff resources required to manually input data over the duration of the project, staff is
proposing to install an automated gate entry system. The automated system will provide a
streamlined entry process that will allow for efficient tracking of incoming material loads and
provide day-to-day accurate summary reporting for auditing purposes. Furthermore the gate entry
system will assist with material planning and forecasting as construction continues toward project
completion.
236
The proposed gate entry system will include CCTV cameras for inspections. All loads entering the
site go through a thorough investigation to determine that all incoming material meets TRCA
standards and regulations, including testing at the demolition sites and inspection by staff at gate
entry and upon dumping the loads on-site.
The automated gate entry system will include the construction of two entry and one exit lanes,
separate staff entry and exit gates, magnetic loop system, software design, magnetic swipe card
reader, intercoms, ticket reader and staff booth, and CCTV cameras for load inspection and
service connections. The system is proposed to be installed and commissioned by end of
September 2017.
RATIONALE
Design -build Request for Proposals (RFP) for general contractors for Contract # 10003420 was
publicly advertised on the electronic procurement website Biddingo (www.biddingo.com) on
Wednesday, March 22, 2017. The submissions were evaluated on a weighted scoring system
consisting of 70% technical criteria and the remaining 30% on the fee proposal. The evaluation
criteria included the following:
Experience, qualifications, and availability of consultant and its employees proposed for
the services;
Design builder's understanding of the services, project and scope of work;
Experience with similar projects;
Proposed approach and methodology for the coordination of services including an
assessment of any anticipated difficulties and the proposed approach to overcome them;
Reasonableness of cost.
Request for Proposal documents were received by the following seven general contractors:
IBI Group;
Precise ParkLink Inc.;
Affinity Systems Ltd.;
NEI Construction Corp;
Dilisado Enterprises Ltd.;
Four Seasons Site Development; and
Rutherford Contracting.
Four bidders attended the mandatory site meeting held on Wednesday March 29, 2017.
Proposals closed on April 24, 2017 and proposals were opened by the Procurement Opening
Committee on April 24, 2017.
Members of the Selection Committee, consisting of TRCA staff (Mark Preston, Michelle Guy and
James Dickie) reviewed the submitted proposals and evaluated them based on the
aforementioned criteria. The results of the evaluation are as follows:
BIDDERS Technical
Financial
TOTAL TENDER
Overall
70%
30%
AMOUNT Plus HST
Ranking
Precise ParkLink Inc. 1
1
$544,751.00
1
NEI Construction Corp 2
2
$728,000.00
2
237
Out of the four bidders that attended that mandatory site meeting, two bidders (IBI Group and
Dilisado Enterprises) declined the opportunity to submit a bid, being unable to meet the deadlines
stated in the contract documents.
Restoration and Infrastructure staff reviewed the bid received from Precise Parklink Inc. against
its own cost estimate and has determined that the bid is of reasonable value and also meets the
requirements as outlined in the contract documents. Further assessment by TRCA staff of
Precise ParkLink Inc.'s experience and ability to undertake similar projects was conducted
through reference checks, which resulted in positive feedback that Precise ParkLink Inc. is
capable of undertaking the scope of work.
TRCA contacted NEI Construction Corporation regarding the price differential and NEI
Construction Corporation indicated that due to their busy schedule, additional resources outside
their company would need to be retained, thus increasing the cost of the scope of work. Precise
Park Link Inc. specializes in this type of work and as a result was able to provide more competitive
pricing for the automated entry system.
Based on the evaluation of the received proposals, it was concluded that the combined technical
and fee proposal valued at $544,751.00 submitted by Precise ParkLink Inc. offered the best
service for value among the general contractors whose technical capacity matched the project
needs. Therefore staff recommends that Precise ParkLink Inc. be awarded Contract #10003420
at a total amount not to exceed $544,751.00 to be expended as authorized by TRCA staff, plus a
10% contingency, plus HST; it being the highest ranked proposal.
FINANCIAL DETAILS
100% funding will be provided from Region of Peel under the Lakeview Waterfront Connection
Project Account #252-47.
Report prepared by: Michelle Guy, extension 5905
Emails: mguyCo2trca.on.ca
For Information contact: Mark Preston, extension 5848
Emails: mpresto n(aDtrca.on. ca
Date: May 23, 2017
238
RES.#B51/17 - CITY OF TORONTO AND THE COMMUNITY ASSOCIATION FOR
RIDERS WITH DISABILITIES
Request for Licence Agreement
4777 Dufferin Street, G. Ross Lord Park, City of Toronto, Don River
Watershed, CFN24311. Receipt of a request from the City of Toronto to
enter into a 20 -year Licence Agreement with the Community Association
for Riders with Disabilities, located in G. Ross Lord Park, City of Toronto.
Moved by: Glenn De Baeremaeker
Seconded by: Jennifer Innis
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS certain lands owned by
Toronto and Region Conservation Authority (TRCA) situate in G. Ross Lord Park in the
City of Toronto have been turned over to the City of Toronto for management under the
terms of an agreement between the City of Toronto and TRCA dated June 14, 1961;
WHEREAS the Community Association for Riders with Disabilities (CARD) has had an
agreement with the City of Toronto at this location since 1979 and has requested from the
City of Toronto an additional 20 -year license agreement;
THEREFORE LET IT BE RESOLVED THAT TRCA concur with the City of Toronto entering
into a Licence Agreement with CARD for a term of 20 years commencing on September 1,
2020 and ending on August 31, 2040;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
CARD was established in 1969 and moved to the G. Ross Lord Park in 1979, where they continue
to operate as a not-for-profit, charitable organization whose objective is to promote therapy and
quality of life for physically and developmentally challenged people through horseback riding.
Under the supervision of specially trained physiotherapists and skilled equestrian staff, individuals
with disabilities experience numerous benefits of equestrian therapy and the joy of horseback
riding.
CARD currently operates under a license with the City of Toronto (as Licensor) and TRCA (as
Landowner). The current license agreement, which terminates on August 31, 2020 was
authorized by Clause 25 of Report No. 6 of the Policy and Finance Committee and adopted by the
Council of the City of Toronto on July 20, 21 and 22, 2004. At Authority Meeting #11/04 held on
January 7, 2005 under Resolution #A332/04, the Authority approved this license agreement.
CARD has requested approval from the City of Toronto to establish a new license agreement well
in advance of the expiry of the current license as they would like to undertake capital
improvements of the facility, as well as conduct fundraising in advance of CARD's 50 -year
anniversary in 2019. All costs associated with the capital improvements to the facilities are to be
at the sole expense of CARD.
The term for the new license period is to be for 20 years commencing on September 1, 2020 and
ending on August 31, 2040
239
FINANCIAL DETAILS
No revenue or expense will be incurred in this instance by TRCA.
Report prepared by: Lori Colussi, extension 5303
Emails: Icolussi(a)trca.on.ca
For Information contact: Lori Colussi, extension 5303
Emails: IcolussiC&trca.on.ca
Date: May 24, 2017
240
Section II — Items for Executive Action
RES.#B52/17 - FLOOD PROTECTION LAND FORMING TECHNICAL GUIDELINE
DOCUMENT
Award of Contract #10004096. Award of preferred source Contract
#10004096 for the development of a design and construction guideline for
flood protection land forming measures.
Moved by: Vincent Crisanti
Seconded by: Chris Fonseca
THAT Contract #10004096 for the development of a technical guideline for flood protection
land forming be awarded to AECOM on a preferred source basis for a total cost not to
exceed $44,936.00 plus $4,500.00 contingency to be expended as authorized by Toronto
and Region Conservation Authority (TRCA) staff, plus HST.
CARRIED
BACKGROUND
TRCA is currently working with the Region of Peel, City of Brampton and City of Mississauga in
developing flood remediation plans for high risk flood vulnerable areas including Downtown
Brampton and the Dixie and Dundas Special Policy Areas. These flood remediation studies
include the evaluation of a number of flood control measures including; enlarging channels and
water crossings, flow diversions, enhanced stormwater management, dams, berms/dykes and
land forming. Given the urban land characteristics and the complexity in the drainage systems in
these areas, the flood remediation solutions generally rely on a series of flood control measures
working in combination in order to provide a comprehensive flood remediation solution.
The majority of the flood control measures are well understood and have been widely applied
globally with the exception of flood protection land forming. Flood protection land forming is a
relatively new concept that reshapes the land to provide passive flood protection. Flood protection
landforms are similar to berms in that they are man-made barriers placed adjacent to river
corridors to guard against potential flooding. However, unlike traditional berms, land forms are
built on a much larger scale with gentle slopes designed to be passive, require less maintenance
and guard against all traditional modes of failure that compromise traditional berms/dykes such as
overtopping, saturation and boils (groundwater uplift).
Since flood protection land forming is a relatively new concept, a significant level of detail and
analysis at both the Environmental Assessment (EA) and detailed design level is required to
establish acceptable footprints, define construction materials and methodology as well as grading
and future maintenance and operational requirements. To date only one flood protection landform
has been constructed in TRCA's jurisdiction which is located within the West Don Lands.
The planning and design of the West Don Lands Landform was completed as a partnership
between Toronto Waterfront Revitalization Corporation (TWRC), TRCA and all levels of
government. The West Don Lands Landform, which extends from Queen Street in the north to the
railway tracks in the south is 775 metres long, 4 metres high and made of roughly 400,000 cubic
metres of soil. The design process for the Landform underwent a comprehensive consultation
process including a Municipal Class EA and now provides flood protection for approximately 500
acres of land including prime downtown lands, the Financial District of Toronto and the newly
developed West Don Lands.
241
The technical assessments required to design and construct the West Don Lands flood protection
Landform included a number of professional disciplines including civil engineers, hydrogeologists,
structural engineers, landscape architects and geotechnical engineers to ensure the structure
satisfied both TRCA and provincial requirements for permanent flood protection. Although a
number of engineering disciplines were included in the design process, no formal documentation
was completed post construction to define the specific design considerations and the scope of
technical studies to be used for future applications.
The intent of this assignment is to develop a technical guideline document for the design,
construction, operations and maintenance of flood protection land forming. This guideline
document will assist TRCA and our municipal and provincial partners plan for, design and
construct land forming solutions that can be applied as a stand-alone measure or as part of a
comprehensive solution involving multiple solutions to flood protection.
In addition to defining the major design aspects of flood protection land forming, this assignment
will also undertake a review of best practice in flood mitigation alternative measures and design
considerations used internationally. The intent is to learn from other jurisdictions globally and
ensure all flood remediation alternatives considered for use in TRCA's jurisdiction are planned
and designed using the best standard of practice possible.
RATIONALE
AECOM is a multinational consulting firm with the ability to draw on considerable corporate
knowledge related to the design and management of flood control facilities.
AECOM brings substantial experience with design of dams and other structures for power
generation and flood protection, with projects covering hydraulic and structural design,
geotechnical and hydrogeological investigations, slope stability, dam break analysis, asset
evaluation and rehabilitation, operations and monitoring. As an illustration, AECOM was involved
in planning and design of almost 200 dams and reservoirs around the globe.
In addition, AECOM staff was involved in preparation of the Hurricane and Storm Damage Risk
Reduction System Design Guidelines (USAGE, 2007), which was developed in response to some
of the most challenging floods in the recent history (e.g. Hurricane Katrina). AECOM was also
involved in the design of the existing West Don Lands Landform in the City Toronto, the "first of its
kind" flood control facility in the Province of Ontario.
Given their vast corporate resources, global and local experience related to the design and
implementation of flood control facilities, it is Engineering Services staff opinion that AECOM is
the only local consulting firm with the ability to complete the project within the timelines and
budget.
Staff therefore recommend award of the contract on a preferred source basis as per Section 9.3.3
of TRCA's Purchasing Policy as follows:
The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably provided
by any other supplier.
242
Staff is confident that AECOM will conduct the required tasks in a timely and cost effective
manner and therefore recommends that Contract #10004096 be awarded to AECOM on a
preferred source basis for a total cost of $44,936.00, plus a $4,500.00 contingency, plus HST.
FINANCIAL DETAILS
The upset limit for Contract #10004096 is $49,436.00 including the recommended contingency,
plus HST. Funding for this study will be made available through Peel Region's Flood Remedial
Capital Works account 129-19.
Report prepared by: Nick Lorrain, extension 5278
Emails: nlorrainAtrca.on.ca
For Information contact: Nick Lorrain, extension 5278
Emails: nlorrain(ZDtrca.on.ca
Date: June 9, 2017
243
Section IV — Ontario Regulation 166/06, As Amended
RES.#653/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.6 and 10.9 - 10.11, which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.6 AND 10.9 — 10.11 ARE MAJOR APPLICATIONS -
REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF BRAMPTON
10.1 AHMADIYYA MOVEMENT IN ISLAM (ONTARIO) INC.
To construct, reconstruct, erect or place a building or structure and site grade on Part
Lot 13, Concession 1, (10545 Hurontario Street), in the City of Brampton, Etobicoke
Creek Watershed as located on the property owned by Ahmadiyya Movement in Islam
(Ontario) Incorporated. The purpose is to undertake works within TRCA's Regulated
Area of the Etobicoke Creek Watershed in order to facilitate the construction of a
2,816.58 square metre (30,317.41 sq. ft.) place of worship and parking lot associated
with a municipal site plan application and building permit application.
CFN: 55978 - Application #: 0551/16/BRAM
Report Prepared by: Adam Miller 5244 amiller@trca.on.ca
For information contact: Adam Miller 5244 amiller@trca.on.ca
Date: May 30, 2017
244
CITY OF PICKERING
10.2 1868988 ONTARIO INC. AND CITY OF PICKERING
To construct, reconstruct, erect or place a building or structure and site grade on Part
Lot 17, 18, Plan 489, (1234 Kingston Road), in the City of Pickering, Frenchman's Bay
Watershed as located on the property owned by 1868988 Ontario Inc. and City of
Pickering. The purpose is to undertake site grading and filling to facilitate the
construction of a new two storey commercial building with a surface parking lot and
associated servicing works at 1234 Kingston Road in the City of Pickering. A portion of
the proposed works will take place on lands owned by the City of Pickering.
CFN: 56675 - Application #: 0976/16/PICK
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: May 31, 2017
CITY OF PICKERING
10.3 1368 ROUGEMOUNT DRIVE
To construct, reconstruct, erect or place a building or structure and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on
Part Lot 21, Plan 228, (1368 Rougemount Drive), in the City of Pickering, Petticoat
Creek Watershed. The purpose is to remove the basement walk -out and raise the
foundation wall and install a waterproof membrane along the rear portion of the existing
dwelling at 1368 Rougemount Drive in the City of Pickering. The proposal also includes
a new wooden deck to the rear of the dwelling.
CFN: 56007 - Application #: 0590/16/PICK
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: May 29, 2017
CITY OF PICKERING
10.4 1888 ALTONA ROAD
To site grade and temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere on Lot 33, Concession 1 Block 97, Plan 40M-1831,
Part Lot 4, Plan 40R-27661, (1888 Altona Road), in the City of Pickering, Petticoat Creek
Watershed. The purpose is to undertake site grading and fill placement to facilitate the
creation of three residential lots at 1888 Altona Road in the City of Pickering. This
proposal also includes the restoration and planting of the impacted area adjacent to the
valleylands. In order to carry out the proposal, a portion of the grading and subsequent
restoration will also take place on lands owned by the City of Pickering.
CFN: 56583 - Application #: 1090/16/PICK
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: May 31, 2017
245
TOWN OF RICHMOND HILL
10.5 LESLIE ELGIN DEVELOPMENTS INC.
To site grade and temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere on (10961 and 11121 Leslie Street), in the Town of
Richmond Hill, Rouge River Watershed as located on the property owned by Leslie Elgin
Developments Inc.. The purpose is to undertake works within a TRCA Regulated Area of
the Rouge River Watershed in order to facilitate grading and servicing within an OMB
draft approved plan of subdivision associated with municipal official plan, zoning bylaw
amendment, and subdivision application to allow a residential development within the
North Leslie Secondary Plan. These works include establishing sediment and erosion
controls, and facilitate the construction of an outfall and permanent stormwater
management pond (SWM3) outletting downstream to a tributary of the Rouge River.
CFN: 55583 - Application #: 0257/16/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: May 29, 2017
TOWN OF RICHMOND HILL
10.6 LESLIE ELGIN DEVELOPMENTS INC.
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on (10961 and 11121 Leslie Street), in the Town of Richmond Hill, Rouge
River Watershed as located on the property owned by Leslie Elgin Developments Inc..
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed in order to facilitate grading and servicing within an OMB draft approved plan
of subdivision associated with municipal official plan, zoning bylaw amendment, and
subdivision application to allow a residential development within the North Leslie
Secondary Plan. These works include establishing sediment and erosion controls, and
facilitate the construction of an outfall and permanent stormwater management pond
outletting downstream to a tributary of the Rouge River.
CFN: 55585 - Application #: 0259/16/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: May 29, 2017
RES.#B54/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED — ERRATA APPLICATIONS
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
application 10.7 that had been scheduled on the agenda as an errata application, for
which all the required information was received and finalized.
CARRIED
246
PERMIT APPLICATIONS EX10.7 IS A MAJOR APPLICATION - ERRATA
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency works, resolution of violations/after the fact permits, trail construction.
TOWN OF RICHMOND HILL
10.7 MATTAMY (ELGIN MILLS) LIMITED
To site grade and interfere with a wetland on Part Lot 28, Concession 2 (65R34814),
(near Leslie Street and Elgin Mills Road), in the Town of Richmond Hill, Rouge River
Watershed as located on the property owned by Mattamy (Elgin Mills) Limited. The
purpose is to undertake works within a Regulated Area of the Rouge River Watershed to
facilitate the construction of an enhanced wetland within the existing natural heritage
system and the removal of an existing dug pond/wetland associated with an approved
plan of subdivision.
CFN: 57756 - Application #: 0450/17/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: May 30, 2017
RES.#655/17 - STANDARD DELEGATED PERMITS
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.8 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
247
CITY OF BRAMPTON
CITY OF BRAMPTON - Etobicoke Creek Watershed
The purpose is to expand an existing transit maintenance facility and parking lot addition at 130
Sandalwood Parkway, in the City of Brampton. No in -water works are associated with this
project.
CFN: 57483 - Application #: 0269/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: April 24, 2017
73 CROCKER DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 10.97 m. (36ft.) by 2.43 m. (8ft.) in -ground
swimming pool located at the rear of an existing dwelling associated with a municipal building
permit.
CFN: 57720 - Application #: 0402/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Adam Miller, extension 5244, email amiller@trca.on.ca
Date: May 11, 2017
120 BLOOMSBURY AVENUE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 4.8 m (16 ft) by 9.7 m (32 ft) in -ground pool,
3 m (10 ft) by 4.2 m (14 ft) pool shed and a 3 m (10 ft) by 11.2 m (37 ft) deck located at the rear
of an existing dwelling associated with a municipal building permit.
CFN: 57601 - Application #: 0353/171BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: May 16, 2017
PEEL DISTRICT SCHOOL BOARD - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 592.1 sq. m one storey addition to the
south side of the existing elementary school, and a 1,288 sq. m one storey addition to the west
side of the existing elementary school associated with a municipal building permit and site plan
application (City File #SP16-008).
CFN: 55395 - Application #: 0151/16/BRAM
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: May 23, 2017
16 TREMONT COURT - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of an 5.4 m (18 ft) by 10.3 m (34 ft) in -ground
swimming pool located at the rear of an existing dwelling associated with a municipal building
permit.
CFN: 57582 - Application #: 0304/17/BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: May 16, 2017
CITY OF MARKHAM
CITY OF MARKHAM - Don River Watershed
The purpose is to undertake replacement of storm sewer and watermain relocation on Proctor
Avenue to Proctor Park, west of Bayview Avenue, north of Steeles Avenue. The storm sewer
will be replaced with a larger sewer in order to increase the hydraulic capacity.
CFN: 56038 - Application #: 0289/17/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: May 15, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to repair four existing bridge structures on the Markham Green Golf Course and
install new deck treatment.
CFN: 56041 - Application #: 0270/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 5, 2017
33 NORMANDALE ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the constructions of a sunroom addition approximately 17.3
square metres (186.22 square feet) in size at the rear of the existing dwelling.
CFN: 57708 - Application #: 0432/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: May 2, 2017
249
ROUGEBANK FOUNDATION - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the restoration and repair of existing balcony slabs and railing
guards on an 6 -storey apartment building located on the subject property.
CFN: 57753 - Application #: 0458/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: May 4, 2017
CITY OF PICKERING
1019 DALEWOOD DRIVE - Petticoat Creek Watershed
The purpose is to construct a new two-storey addition and third storey balcony to the rear and
side of the existing single family detached dwelling at 1019 Dalewood Drive in the City of
Pickering.
CFN: 57641 - Application #: 0383/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 16, 2017
CITY OF PICKERING - Duff ins Creek Watershed
The purpose is to reconstruct Sixth Concession Road from Westney Road to Greenwood Road,
in the City of Pickering. The Redside Dace construction timing window will apply to this project
unless otherwise stated in writing by the Ministry of Natural Resources and Forestry (MNRF).
CFN: 56828 - Application #: 0025/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: May 26, 2017
1455 ROUGEMOUNT DRIVE - Petticoat Creek Watershed
The purpose is to construct a new wooden deck to the rear and side of the existing single family
dwelling at 1455 Rougemount Drive in the City of Pickering.
CFN: 57737 - Application #: 0447/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 16, 2017
1135 RIDGEWOOD COURT - Duffins Creek Watershed
The purpose is to construct a sunroom to the rear of the existing single family detached dwelling
at 1135 Ridgewood Court in the City of Pickering.
250
CFN: 57762 - Application #: 0497/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 16, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
121 CLEARBROOKE CIRCLE - Humber River Watershed
The purpose is to construct a detached garage in the rear yard of the existing single family
detached dwelling at 121 Clearbrooke Circle in the City of Toronto (Etobicoke York). The
existing garage is to be demolished.
CFN: 57633 - Application #: 0452/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 5, 2017
64 GREENBROOK DRIVE - Humber River Watershed
The purpose is to construct a second storey addition to the existing single family dwelling at 64
Greenbrook Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57111 - Application #: 1292/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 2, 2017
46 REID MANOR - Mimico Creek Watershed
The purpose is to construct a two storey single family dwelling at 46 Reid Manor in the City of
Toronto (Etobicoke York Community Council Area).
CFN: 57017 - Application #: 1246/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 30, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
205B NEWTON DRIVE - Don River Watershed
The purpose is to construct of a new single family detached residential dwelling at 2058 Newton
Drive in the City of Toronto (North York Community Council Area). The existing lot was severed
into two developable lots and the existing dwelling will be demolished to accommodate the
proposed works.
CFN: 56103 - Application #: 0624/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 25, 2017
251
205A NEWTON DRIVE - Don River Watershed
The purpose is to construct of a new single family detached residential dwelling at 205A Newton
Drive in the City of Toronto (North York Community Council Area). The existing lot was severed
into two developable lots and the existing dwelling will be demolished to accommodate the
proposed works.
CFN: 56104 - Application #: 0625/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 23, 2017
41 BROADLEAF ROAD - Don River Watershed
The purpose is to construct a new two storey single family dwelling at 41 Broadleaf Road in the
City of Toronto (North York Community Council Area).
CFN: 56636 - Application #: 1165/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 15, 2017
3 KNIGHTSWOOD ROAD - Don River Watershed
The purpose is to construct a replacement retaining wall in the front and side yard of the existing
single family detached dwelling at 3 Knightswood Road in the City of Toronto (North York
Community Council)..
CFN: 57877 - Application #: 0581/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 23, 2017
26 BRENDAN ROAD - Don River Watershed
The purpose is to construct a one storey and two storey addition to the rear of the existing two
storey detached dwelling at 26 Brendan Road in the City of Toronto (North York Community
Council Area).
CFN: 57404 - Application #: 0175/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 23, 2017
108 SANDRINGHAM DRIVE - Don River Watershed
The purpose is to underpin one portion of the basement at the existing two storey single family
detached dwelling at 108 Sandringham Drive in the City of Toronto (North York Community
Council Area).
252
CFN: 57457 - Application #: 0229/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 1, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
106 ZAPH AVENUE - Highland Creek Watershed
The purpose is to construct a replacement deck to the rear of the existing dwelling at 106 Zaph
Avenue in the City of Toronto (Scarborough Community Council Area).
CFN: 57627 - Application #: 0395/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 25, 2017
43B BURNVIEW CRESCENT - Highland Creek Watershed
The purpose is to construct a two-storey walk -out replacement dwelling with rear deck on the
existing lot of record at 43B Burnview Crescent in the City of Toronto (Scarborough Community
Council Area).
CFN: 57717 - Application #: 0400/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 2, 2017
84 CEDAR BRAE BOULEVARD - Highland Creek Watershed
The purpose is to construct a one storey rear addition to the existing one and a half storey
single family detached dwelling at 84 Cedar Brae Boulevard in the City of Toronto (Scarborough
Community Council Area).
CFN: 56487 - Application #: 0935/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 1, 2017
MILITARY TRAIL DEVELOPMENT CORPORATION - Highland Creek Watershed
The purpose is to construct twelve two storey single family dwellings at 1379 - 1393 and 1399 -
1405 Military Trail in the City of Toronto (Scarborough Community Council Area).
CFN: 57355 - Application #: 0118/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 2, 2017
253
TORONTO TRANSIT COMMISSION - Don River Watershed
The purpose is to replace the lighting system. No in -water work is within the scope of this
project.
CFN: 55328 - Application #: 0100/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 4, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
16 ALDER ROAD - Don River Watershed
The purpose is to construct a one storey and basement addition and a wooden deck to the rear
of the existing single family detached dwelling at 16 Alder Road in the City of Toronto (Toronto
and East York).
CFN: 57600 - Application #: 0354/171TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 16, 2017
7 RIDGEWOOD ROAD - Don River Watershed
The purpose is to construct a sunroom to the rear of the existing dwelling at 7 Ridgewood Road
in the City of Toronto (Toronto and East York Community Council Area).
CFN: 57446 - Application #: 0219/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 1, 2017
80 CHESTNUT PARK - Don River Watershed
The purpose is to construct a pool to the rear of the proposed replacement dwelling at 80
Chestnut Park in the City of Toronto (Toronto and East York Community Council Area).
CFN: 57880 - Application #: 0579/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 23, 2017
CITY OF VAUGHAN
CITY OF VAUGHAN - Don River Watershed
The purpose is to construct Phase 1 of the North Maple Regional Park recreational facilities.
Phase 1 works will be located at the north end of the City owned 81 -hectare site located east of
Keele Street between Teston Road and Kirby Road. The proposal includes installation of a
double artificial turf soccer facility, area for parking, building for servicing and washroom.
254
CFN: 56854 - Application #: 0196/17/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: May 18, 2017
CITY OF VAUGHAN - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate servicing works including the installation of storm outlets associated with the
Vaughan Healthcare Centre Precinct (VHCP) project, in the City of Vaughan.
CFN: 57631 - Application #: 0456/17NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 15, 2017
FUMATA DEVELOPMENT CORPORATION - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate topsoil stripping and the installation of sediment and erosion control
measures in draft approved plan of subdivision (19T -15V012) within Block 12, southwest of
Bathurst and Teston Road, in the City of Vaughan.
CFN: 57593 - Application #: 0348/17/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 5, 2017
NASHVILLE (NORTH) DEVELOPMENTS INC. / TACC DEVELOPMENTS INC. - Humber
River Watershed
The purpose is to allow development, interference with a wetland and alteration of a
watercourse within a Regulated Area of the Humber River Watershed to facilitate the
construction of a temporary construction access, including a replacement culvert, at Tributary 'A'
and Mactier Drive between draft approved plans of subdivision within Block 61 West (19T -
10V004 and 19T -15V006), southeast of Nashville Road and Huntington Road, in the City of
Vaughan.
CFN: 57209 - Application #: 0047/17/VAUG
Report Prepared by: Coreena Smith, extension 5269, email csmith@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: May 23, 2017
82 TAYOK DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 418.06 sq.m. (4,499.97 sq.ft.) two-storey
single family dwelling associated with a municipal building permit. The subject property is
municipally known as 82 Tayok Drive, in the City of Vaughan.
255
CFN: 57645 - Application #: 0390/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: May 8, 2017
TOWN OF AJAX
3 KAVANAUGH COURT - Duffins Creek Watershed
The purpose is to construct an inground pool with associated hardscaping to the rear of the
existing single family detached dwelling at 3 Kavanaugh Court in the Town of Ajax.
CFN: 57698 - Application #: 0391/171AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 12, 2017
REGIONAL MUNICIPALITY OF DURHAM - Duffins Creek Watershed
The purpose is to rehabilitate an existing bridge over Duffins Creek on Bayly Street West,
approximately 0.4 km west of Westney Road, in the Town of Ajax. The warm water construction
timing window will apply to this project.
CFN: 56494 - Application #: 1150/16/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: May 4, 2017
RICHPARK HOMES LTD. - Duffins Creek Watershed
The purpose is to site grade and construct townhomes.
CFN: 57587 - Application #: 0317/17/AJAX
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 22, 2017
42 SPIERS CRESCENT - Carruthers Creek Watershed
The purpose is to construct a new deck and reconstruct an inground pool to the rear 42 Spiers
Crescent in the Town of Ajax.
CFN: 57736 - Application #: 0449/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 12, 2017
48 BISSLAND DRIVE - Carruthers Creek Watershed
The purpose is to construct an inground pool to the rear of the existing single family detached
dwelling at 48 Bissland Drive in the Town of Ajax.
256
CFN: 57623 - Application #: 0366/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 16, 2017
TOWN OF CALEDON
69 MATSON DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 18.59 m. (61ft.) by 3.04 m. (11 Oft.)
replacement wood deck located at the rear yard of an existing residential dwelling associated
with a municipal building permit.
CFN: 57718 - Application #: 0389/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 17, 2017
15896 MOUNT PLEASANT ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to replace an existing septic system at the rear of an existing dwelling
associated with a municipal building permit application.
CFN: 57366 - Application #: 0147/171CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 1, 2017
49 QUEEN STREET NORTH - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate renovations to an existing two storey apartment of a commercial
building, including the construction of a second storey deck associated with a municipal buildinc
permit.
CFN: 57637 - Application #: 0370/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 17, 2017
ISLINGTON SPORTSMEN'S CLUB INCORPORATED - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the removal of excess sediment to rehabilitate a man-made
pond.
CFN: 56877 - Application #: 1174/16/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: April 28, 2017
257
20 MEADOW BROOK COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 3.6 m (12 ft) by 23 m (7 ft) in -ground pool
and deck associated with a municipal building permit.
CFN: 57467 - Application #: 0241/171CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: April 28, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to upgrade an existing sewage pumping station, located at 15897 Airport Road,
south of Mountcrest Road, in the Town of Caledon. No in -water works are associated with this
project.
CFN: 56602 - Application #: 1209/161CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: May 25, 2017
STELLAR HOMES INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 586.6 sq. m (6314.10 sq. ft.) model sales
home and a septic system located on a vacant lot of record associated with a municipal building
permit, and municipal site plan application (Town File No. SPA 17-0009).
CFN: 57389 - Application #: 0156/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 19, 2017
TOWN OF RICHMOND HILL
100 GREENBELT CRESCENT - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate renovations to a fire damaged residential dwelling, including the re-
construction of the second storey and rear deck.
CFN: 57759 - Application #: 0469/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: May 9, 2017
26 WALMER ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a two-storey dwelling and a deck at the rear of the
subject property.
258
CFN: 57421 - Application #: 0184/17/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: May 9, 2017
TOWN OF RICHMOND HILL - Don River Watershed
The purpose is to replace existing ductile iron watermain with a PVC watermain within the road
right-of-way (ROW) of Castle Rock Drive between Weldrick Road West and Avenue Road. The
redside dace timing window of July 1 to September 15 will apply to this proposal unless
otherwise specified in writing by Ministry of Natural Resources and Forestry (MNRF).
CFN: 57049 - Application #: 0133/171RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: May 10, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
34 LAKEVIEW AVENUE - Rouge River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Rouge River Watershed, the
development of a 422.4 sq. m. (4,547 sq. ft.) replacement 2 storey dwelling and garage on lands
known municipally as 34 Lakeview Avenue, in the Town of Whitch urch-StouffviIle.
CFN: 56730 - Application #: 1051/16MS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 9, 2017
TOWNSHIP OF ADJALA-TOSORONTIO
HUMMINGBIRD HILL FARMS LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 16.74 m. (55 ft.) by 12.19 m. (40 ft.)
replacement non -habitable accessory structure located at the rear of an existing residential
dwelling associated with a municipal building permit.
CFN: 57870 - Application #: 0542/171ADJ
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 25, 2017
1216 7TH LINE ADJALA - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 19.8 m by 13.0 m (65 ft. by 42.7 ft.)
workshop addition to the existing residential dwelling associated with a municipal building
permit.
259
CFN: 57635 - Application #: 0460/17/ADJ
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: April 26, 2017
TOWNSHIP OF KING
105 WATCH HILL ROAD - Humber River Watershed
The purpose is to facilitate, in the TRCA's Regulated Area of the Humber River Watershed, the
construction of a new 475sq. m. (4926sq. ft.) replacement single family dwelling and septic
system, and the removal and restoration of an existing asphalt tennis court. The subject
property is known municipally as 105 Watch Hill Road, in the City of Vaughan.
CFN: 57410 - Application #: 0181/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 25, 2017
3185 16th SIDEROAD - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
construction of a replacement single residential dwelling measuring 625.7 sq. m. (6735 sq. ft.), a
14.9 sq. m. (160.4 sq. ft.) cabana, a 33.1 sq. m. (356 sq. ft.) semi-detached garage, and an
associated septic system. The subject property is known municipally as 3185 16th Sideroad, in
the Township of King.
CFN: 57625 - Application #: 0379/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 21, 2017
140 EAST HUMBER DRIVE - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
construction of a 498.19 sq. m. (5362.47 sq. ft.) two-storey single detached dwelling, and a 67.'
sq. m. (722.3 sq. ft.) in ground pool. The subject property is known municipally as 140 East
Humber Drive, in the Township of King.
CFN: 57724 - Application #: 0430/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 24, 2017
260
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
REGIONAL MUNICIPALITY OF PEEL
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Highway 50, between Coleraine Drive and Castlemore Road, in the City of Brampton,
Humber River Watershed as located on property owned by the Regional Municipality of Peel.
The purpose is to install a 400 mm diameter watermain on Highway 50, between Coleraine
Drive and Castlemore Road, in the City of Brampton. The Redside Dace construction timing
window will apply to this project unless otherwise stated in writing by the Ministry of Natural
Resources and Forestry (MNRF).
CFN: 57481 - Application #: 0252/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email lsotoudeh@trca.on.ca
Date: May 26, 2017
CITY OF MARKHAM
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the
south side of Columbia Way, west of Allstate Parkway, in the City of Markham, Rouge River
Watershed as located on the property owned by the City of Markham, under franchise
agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas
service crossing underneath a watercourse. The warm water construction timing window will
apply to this project.
CFN: 56047 - Application #: 0375/17/MARK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 4, 2017
CITY OF PICKERING
CITY OF PICKERING
To undertake structure maintenance at 750 Whitevale Road, between Sideline 28 and Sideline
26, in the City of Pickering, Duffins Creek Watershed as located on property owned by the City
of Pickering. The purpose is to replace an existing culvert located at 750 Whitevale Road,
between Sideline 28 and Sideline 26, in the City of Pickering. No in -water works are associated
with this project.
261
CFN: 56500 - Application #: 1251/16/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: May 26, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway near 380 Albion Road, north of Elmhurst Drive, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed, as located on property owned by the City
of Toronto. The purpose is to undertake telephone service upgrades. Works will involve
removal and replacement of the existing telephone conduits. No in -water works are within the
scope of this project.
CFN: 56128 - Application #: 0759/161TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: May 26, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Kipling Avenue from Rowntree Road to Albion Road, located near Finch Avenue West, in the
City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located
on property owned by the City of Toronto. The purpose is to undertake watermain rehabilitation.
The warm water construction timing window of July 1 to March 31 will be applied to this project.
CFN: 57323 - Application #: 0121/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 12, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on The Westway, from Saskatoon Drive to Royal York Road, located near Dixon Road, in the
City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located
on property owned by the City of Toronto. The purpose is to undertake watermain rehabilitation.
The warm water construction timing window of July 1 to March 31 will be applied to this project.
CFN: 57324 - Application #: 0120/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
262
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Jane Street, Alliance Avenue and Humber Boulevard North, located near Weston Road and
Black Creek Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber
River Watershed as located on property owned by the City of Toronto. The purpose is to
undertake watermain rehabilitation. The warm water construction timing window of July 1 to
March 31 will be applied to this project.
CFN: 57328 - Application #: 0119/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Sevenoaks Avenue from Leland
Avenue to Leamington Avenue, located near Royal York Road and Norseman Street, in the City
of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on
property owned by the City of Toronto. The purpose is to undertake road reconstruction. No in -
water work is within the scope of this project.
CFN: 57654 - Application #: 0425/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 2, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Delroy Drive from McIntosh
Avenue into Jeff Healey Park, in the City of Toronto (Etobicoke York Community Council Area),
Mimico Creek Watershed as located on property owned by the City of Toronto. The purpose is
to undertake road resurfacing. No in -water work is within the scope of this project.
CFN: 57655 - Application #: 0424/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 2, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the south side of Finch Avenue West, west of Islington Avenue, in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed as located on the property
owned by the City of Toronto, under franchise agreement with Enbridge Gas Distribution Inc.
The purpose is to install a 30" gas pipe within an existing road. No in -water works are
associated with this project.
CFN: 57556 - Application #: 0420/171TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 25, 2017
263
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake borehole investigations in Sunnybrook Park, located at 1132 Leslie Street, 40
Beth Nealson Drive and south west of Beth Nealson Drive and Wicksteed Avenue, in the City of
Toronto (North York Community Council Area), Don River Watershed as located on City of
Toronto -owned property and privately owned property. The purpose is to undertake
geotechnical investigations. No in -water work is within the scope of this project.
CFN: 57165 - Application #: 0255/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 8, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Willowdale Avenue from Cummer Avenue to Finch Avenue East, in the City of Toronto
(North York Community Council Area), Don River Watershed as located on the property owned
by the City of Toronto. The purpose is to undertake watermain rehabilitation. The warm water
construction timing window of July 1 to March 31 will be applied to this project.
CFN: 57325 - Application #: 0115/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Sheppard Avenue West, from Arleta Avenue to Seeley Drive, in the City of Toronto (North
York Community Council Area), Humber River Watershed as located on property owned by the
City of Toronto. The purpose is to install conduit and grade level boxes. No in -water work is
within the scope of this project.
CFN: 57658 - Application #: 0475/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 3, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake borehole investigations on St. Clair Avenue East from Warden Avenue to east of
Birchmount Road and within the Taylor Massey Creek valley near Victoria Park Avenue, in the
City of Toronto (Scarborough Community Council Area), Don River Watershed as located on
property owned by the City of Toronto. The purpose is to undertake geotechnical investigations.
No in -water work is within the scope of this project.
264
CFN: 57164 - Application #: 0256/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 2, 2017
CITY OF TORONTO
To undertake borehole investigations within the Massey Creek valley, from Victoria Park
Avenue to east of Warden Avenue, in the City of Toronto (Scarborough Community Council
Area), Don River Watershed as located on property owned by the City of Toronto. The purpose
is to undertake geotechnical investigations. No in -water work is within the scope of this project.
CFN: 57167 - Application #: 0253/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 3, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Trudelle Street, from Danforth Road to McCowan Road, located near Eglinton Avenue East,
in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as
located on property owned by the City of Toronto. The purpose is to undertake watermain
rehabilitation. The warm water construction timing window of July 1 to March 31 will be applied
to this project.
CFN: 57326 - Application #: 0116/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Scarborough Golf Club Road, from Densgrove Road to Brimorton Drive, located near
Lawrence Avenue East, in the City of Toronto (Scarborough Community Council Area),
Highland Creek Watershed as located on property owned by the City of Toronto. The purpose
is to undertake watermain rehabilitation. The warm water construction timing window of July 1 to
March 31 will be applied to this project.
CFN: 57327 - Application #: 0117/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
265
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake borehole investigations near the intersection of Lake Shore Boulevard East and
Cherry Street, south of the Gardiner Expressway, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to undertake geotechnical investigations. No in -water work is within the
scope of this project.
CFN: 57161 - Application #: 0259/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 2, 2017
CITY OF TORONTO
To undertake borehole investigations on Carlaw Avenue, south of Lake Shore Boulevard East,
and on Commissioners Street, east of Carlaw Avenue, in the City of Toronto (Toronto and East
York Community Council Area), Don River Watershed as located on property owned by the City
of Toronto. The purpose is to undertake geotechnical investigations. No in -water work is within
the scope of this project.
CFN: 57162 - Application #: 0258/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 2, 2017
CITY OF TORONTO
To undertake borehole investigations northwest of Broadview Avenue and Gerrard Street East
and south of Millway Road and Redwood Road, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by City of
Toronto. The purpose is to undertake geotechnical investigations. No in -water work is within the
scope of this project.
CFN: 57163 - Application #: 0257/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 15, 2017
CITY OF TORONTO
To undertake borehole investigations in the Taylor Massey Creek valley from west of Victoria
Park Avenue to west of O'Connor Drive, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to undertake geotechnical investigations. No in -water work is within the
scope of this project.
CFN: 57166 - Application #: 0254/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 3, 2017
266
CITY OF VAUGHAN
CITY OF VAUGHAN
To undertake road/pathway resurfacing or reconstruction, undertake drainage structure
maintenance on 10418 Islington Avenue, near Nashville Road, in the City of Vaughan, Humber
River Watershed as located on the property owned by City of Vaughan. The purpose is to
undertake maintenance of the interior and exterior of an existing building, installation of a new
patio, and pathway resurfacing.
CFN: 57559 - Application #: 0483/17NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 12, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within a future roadway
on the east side of Kleinburg Summit Way, south of Lacrosse Trail, in the City of Vaughan,
Humber River Watershed as located on the property owned by the City of Vaughan, under a
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a 2" gas
pipeline above a watercourse. The Redside Dace fisheries timing window applies to this project,
unless otherwise stated in writing by the Ministry of Natural Resources and Forestry.
CFN: 57562 - Application #: 0472/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 30, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the roadways of
Kleinburg Summit Way and Silver Morning Court, located south of Kirby Road and west of
Kipling Avenue, in the City of Vaughan, Humber River Watershed as located on the property
owned by the City of Vaughan, under a franchise agreement with Enbridge Gas Distribution Inc.
The purpose is to install 4" gas pipelines in order to service an upcoming subdivision.
CFN: 57563 - Application #: 0471/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 24, 2017
TOWN OF AJAX
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Taunton Road West; east of Harwood Avenue North, in the Town of Ajax, Duffins Creek
Watershed as located on property owned by the Regional Municipality of Durham. The purpose
is to install two conduits on Taunton Road West, just east of Harwood Avenue North, in the
Town of Ajax. The warm water construction timing window will apply to this project.
267
CFN: 56535 - Application #: 0962/16/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: May 5, 2017
TOWN OF RICHMOND HILL
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Yonge Street, near Bernard Avenue, in the Town of Richmond Hill, Rouge River Watershed
as located on the property owned by Regional Municipality of York. The purpose is to
undertake installation of a Bell ducts within the road right-of-way along the Yonge Street near
Bernard Avenue. The ducts will be installed by using Horizontal Directional Drilling method and
open trench methods. The works are required to accommodate the road widening of Yonge
Street and is associated with the VIVA Bus Raid Transit (BRT) project.
CFN: 56849 - Application #: 0310/17/RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: May 17, 2017
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Yonge Street, south of Trayborn Drive to south of Nottingham Drive, near Elgin
Mills Road, in the Town of Richmond Hill, Don River Watershed as located on the property
owned by the City of Vaughan. The purpose is to undertake installation of bell duct cables,
manholes and ground level boxes.
CFN: 57014 - Application #: 1290/161RH
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 3, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the future roadways
of Luray Drive, Ducharme Avenue, Bawden Drive, and Hilts Drive, in the town of Richmond Hill,
Rouge River Watershed as located on the property owned by The Town of Richmond Hill, under
a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 6 PE
IP gas pipeline crossing above a culvert. No in -water works are associated with this project.
CFN: 57568 - Application #: 0479/171RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 29, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the west side of Yonge Street, south of Trayborn Avenue, in the Town of Richmond Hill, Don
River Watershed as located on the property owned by the Regional Municipality of York, under
a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 6 PE
IP gas pipeline within an existing roadway. No in -water works are associated with this project.
CFN: 57576 - Application #: 0485/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: May 26, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway along the Yonge Street from Levendale Road to Leonard Street, in the Town of
Richmond Hill, Don River Watershed as located on the property owned by Regional Municipality
of York. The purpose is to undertake installation of Rogers ducts within the road right-of-way
along Yonge Street from Levendale Road to Leonard Street. The works are required to
accommodate the road widening of Yonge Street and is associated with the VIVA Bus Raid
Transit (BRT) project.
CFN: 54890 - Application #: 0287/17/RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpi la@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: May 17, 2017
TRANSCANADA PIPELINES LTD.
To undertake borehole investigations north of 11300 Bayview Avenue, in the Town of Richmond
Hill, Rouge River Watershed as located on the property owned by TransCanada Pipelines Ltd,
and Holy Trinity School with access provided through permission to enter. The purpose is to
undertake a borehole investigation to support a proposed integrity dig.
CFN: 57832 - Application #: 0549/17/RH
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: May 16, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
269
CITY OF BRAMPTON
22 PECAN DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 20, Plan 43M-1652, 22 Pecan Drive, in
the City of Brampton, Humber River Watershed.
CFN: 57783 - Application #: 0504/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 10, 2017
82 BLOOMSBURY AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 83, Plan 43 -
1573, 82 Bloomsbury Avenue, in the City of Brampton, Humber River Watershed.
CFN: 57820 - Application #: 0520/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 18, 2017
28 NAPERTON DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 34 - 2 Plan 43M-
1829, 28 Naperton Drive in the City of Brampton, Etobicoke Creek Watershed.
CFN: 57892 - Application #: 0585/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 26, 2017
54 VIEWMOUNT CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 8, Plan 43M-
1914, 54 Viewmount Crescent, in the City of Brampton, Etobicoke Creek Watershed.
CFN: 57871 - Application #: 0538/171BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 24, 2017
CITY OF MARKHAM
94 BAYWOOD COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 9, Plan
65R3511, (94 Baywood Court), in the City of Markham, Don River Watershed.
270
CFN: 57804 - Application #: 0492/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: May 3, 2017
CITY OF PICKERING
1764 SPARTAN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 18, Plan
40M-2023, (1764 Spartan Court), in the City of Pickering, Duffins Creek Watershed.
CFN: 57766 - Application #: 0461/171PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 10, 2017
TRILLIUM MAINTENANCE INC.
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 40M-2382, (3270 Salem Road), in the City of
Pickering, Duffins Creek Watershed as located on the property owned by Trillium Maintenance
Inc..
CFN: 57788 - Application #: 0511/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
step h ani e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 15, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
4 CRICKLEWOOD ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a ground floor addition up to 50
sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or
undertake work that does not change the footprint of the existing structure on Lot 89, Plan 4411,
(4 Cricklewood Road), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 57351 - Application #: 0141/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 23, 2017
271
5 EDGEHILL ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 4, Plan 2683, (5 Edgehill Road), in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 57908 - Application #: 0616/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 26, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
23 BRIXHAM TERRACE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 167, Plan
4503, (23 Brixham Terrace), in the City of Toronto (North York Community Council Area),
Humber River Watershed.
CFN: 57760 - Application #: 0468/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 18, 2017
10 AUDUBON COURT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 5, Plan 5435, (10 Audubon Court), in the
City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 57768 - Application #: 0496/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 15, 2017
9 POST ROAD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Of Block B Plan 2578, 66R-19428, (9
Post Road), in the City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 57917 - Application #: 0621/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 26, 2017
272
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
1407 MILITARY TRAIL
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Plan 66R-27396, (1407 Military Trail), in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed.
CFN: 57809 - Application #: 0505/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 12, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
EVERGREEN BRICKWORKS
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on the Lower Don
Trail north of Prince Edward Viaduct, south of Don Valley Parkway Bloor Street and Bayview
Avenue ramps, in the City of Toronto (Toronto and East York Community Council Area), Don
River Watershed as located on property owned by the City of Toronto.
CFN: 57349 - Application #: 0376/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: May 23, 2017
CITY OF VAUGHAN
6 PINE RIDGE AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 3, Plan
65R-25652, (6 Pine Ridge Avenue), in the City of Vaughan, Humber River Watershed.
CFN: 57731 - Application #: 0433/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 27, 2017
82 SALAMANDER COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 264,
Plan 65R-5832, (82 Salamander Court), in the City of Vaughan, Don River Watershed.
CFN: 57755 - Application #: 0453/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: April 27, 2017
273
62 MONSHEEN DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 7, Plan C,
(62 Monsheen Drive), in the City of Vaughan, Humber River Watershed.
CFN: 57719 - Application #: 0404/17/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: May 23, 2017
88 STARWOOD ROAD
To install a swimming pool on Lot 9, Plan 65R-27448, (88 Starwood Road), in the City of
Vaughan, Don River Watershed.
CFN: 57769 - Application #: 0495/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 4, 2017
24 BIRCH HILL ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 18, Plan M-1114, (24 Birch Hill Road), in the City of
Vaughan, Humber River Watershed,
CFN: 57648 - Application #: 0380/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: April 27, 2017
279 CHARLTON AVENUE
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) on Lot 194, Plan 64M-2299, (279 Charlton Avenue), in the City of
Vaughan, Don River Watershed.
CFN: 57814 - Application #: 0490/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 5, 2017
TOWN OF AJAX
30 MACINTYRE LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 84, UNIT
30, Plan 40M-1720, (30 Macintyre Lane), in the Town of Ajax, Duffins Creek Watershed.
274
CFN: 57765 - Application #: 0462/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 10, 2017
20 MACINTYRE LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 12, Block 84,
Plan 40M-1720, (20 Macintyre Lane), in the Town of Ajax, Duffins Creek Watershed.
CFN: 57811 - Application #: 0513/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 15, 2017
219 5TH CONCESSION ROAD EAST
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 1, Plan
18T - 89058, (219 5th Concession Road East), in the Town of Ajax, Carruthers Creek
Watershed.
CFN: 57897 - Application #: 0618/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 26, 2017
57 HARTY CRESCENT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 22, Plan
40R-17280, (57 Harty Crescent), in the Town of Ajax, Duffins Creek Watershed.
CFN: 57907 - Application #: 0599/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 25, 2017
TOWN OF CALEDON
12669 DIXIE ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 21, Plan
43R-1769, 12669 Dixie Road, in the Town of Caledon, Humber River Watershed.
CFN: 57817 - Application #: 0531/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: May 10, 2017
275
TOWN OF WHITCHURCH-STOUFFVILLE
29 LINCOLNVILLE LANE
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) on Lot 10, 11, Concession 9, (29 Lincolnville Lane), in the Town of
Whitch urch-Stouffville, Duffins Creek Watershed.
CFN: 57810 - Application #: 0514/17/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 8, 2017
91 LAKEVIEW AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 2, Plan 404,
(91 Lakeview Avenue), in the Town of Whitch urch-StouffviIle, Rouge River Watershed.
CFN: 57764 - Application #: 0466/17/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
-Date: April 28, 2017
TOWNSHIP OF KING
55 KINGSWORTH ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 13, Plan 473, (55 Kingsworth
Road), in the Township of King, Humber River Watershed.
CFN: 57872 - Application #: 0541/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 19, 2017
102 TATTON COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 16, Plan
65M-4277, (102 Tatton Court), in the Township of King, Humber River Watershed.
CFN: 57874 - Application #: 0539/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 16, 2017
276
PERMIT APPLICATIONS 10.9 —10.10 ARE MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF PICKERING
10.9 DG GROUP
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Lot 24, Concession 3, (Brock Road and Concession 3), in the City of
Pickering, Duffins Creek Watershed as located on the property owned by Zavala
Developments Inc and Oak Ridges Seaton Inc.. The purpose is to construct a major
stormwater management facility outfall, piping, platform, and permanent maintenance
access driveway and restore with native planting.
CFN: 56919 - Application #: 1281/16/PICK
Report Prepared by: Steve Heuchert 5311 sheuchert@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: June 5, 2017
TOWN OF RICHMOND HILL
10.10 MATTAMY HOMES
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28,
Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by Mattamy Homes. The
purpose is to undertake Phase 1 works within a TRCA Regulated Area of the Rouge
River Watershed to facilitate site alteration and grading, importing large volumes of fill,
and implement temporary stormwater management facilities and sediment and erosion
control measures in support of an approved draft plan of subdivision, associated with a
municipal building permit.
CFN: 56382 - Application #: 0946/16/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 7, 2017
277
TERMINATION
ON MOTION, the meeting terminated at 10:08 a.m., on Friday, June 09, 2017.
Maria Augimeri
Chair
/ks
278
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #5/17 was held at TRCA Head Office, on Friday, July 14,
2017. The Chair Maria Augimeri, called the meeting to order at 9:31 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Jennifer Innis
Member
Mike Mattos
Member
Jennifer McKelvie
Member
PRESENT VIA TELECONFERENCE
Colleen Jordan Member
ABSENT
Glenn De Baeremaeker Member
Chris Fonseca Member
Anthony Perruzza Member
RES.#B56/17 - MINUTES
Moved by: Jennifer McKelvie
Seconded by: Mike Mattos
THAT the Minutes of Meeting #4/17, held on June 9, 2017, be approved.
CARRIED
279
Section I — Items for Authority Action
RES.#657/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Don River Watershed
Quadrant Holdings Inc., CFN 57972. Acquisition of property located north
of Rutherford Road and west of Bathurst Street, in the City of Vaughan,
Regional Municipality of York, under the "Greenlands Acquisition Project
for 2016-2020," Flood Plain and Conservation Component, Don River
watershed.
Moved by: Vincent Crisanti
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.93 hectares (2.29 acres), more or
less, of vacant land, located north of Rutherford Road and west of Bathurst Street, said
land being Part of Lots 17 and 18, Concession 2 designated as Part 19 on Plan 65M-4540
and Parts 19 and 20 on Plan 65M-4541, in the City of Vaughan, Regional Municipality of
York, be purchased from Quadrant Holdings Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm, Gardiner Roberts LLP be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Ms. Rose Orlando, Law Clerk at Brattys LLP, acting as
agent for the owner.
Access to the subject lands will be achieved through its frontage off Marc Santi Boulevard and
through adjacent City of Vaughan owned lands to the north.
Attached is a sketch illustrating the location of the subject lands
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Don River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Draft Plan of Subdivision 19T -13V004 and 19T -13V005, TRCA staff established the
limits of the open space land.
i o
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(a,)trca.on.ca, jtruesdell&trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(aDtrca.on.ca, jtruesdell(ZDtrca.on.ca
Date: June 15, 2017
Attachments: 1
281
%Attach'- N
r
4
a
ect �
`-� Pr erty
0.
yl %.!
,� • SRF .• �
7� i i� � i, R iv�� � ��.I\ �� •• .''. vii
Legend Toronto and Region
Conservation
for The Living City-
...... � PEEL
tax. 0n.—
RES.#B58/17 - CITY OF TORONTO
Request for Permanent Easements Required for the Coxwell Sanitary
Trunk Sewer Bypass Tunnel
City of Toronto, Don River Watershed, CFN 42948. Receipt of a request
from the City of Toronto to provide permanent easements required for the
Coxwell Sanitary Trunk Sewer Bypass Tunnel, within the Lower Don River
valley, from north of O'Connor Drive to Ashbridge's Bay, Don River
watershed, City of Toronto (Toronto and East York Community Council
Area).
Moved by: Vincent Crisanti
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from the City of Toronto to
provide permanent easements for the Coxwell Sanitary Trunk Sewer Bypass Tunnel,
within the Lower Don River valley, from north of O'Connor Drive to Ashbridge's Bay, City
of Toronto (Toronto and East York Community Council Area), Don River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Toronto in this
instance;
THEREFORE LET IT BE RESOLVED THAT permanent easements containing a total of 3.36
hectares (8.30 acres), more or less, be granted to the City of Toronto for the Coxwell
Sanitary Trunk Sewer Bypass Tunnel, said land being designated as:
i) Parcels 1, 2 and 3, as shown on separate plans prepared by the City of Toronto
Engineering and Construction Services Department, Engineering Support Services,
Land & Property Surveys, Job No. 2016-04111, Map Sheet 51G-23, dated August 22,
2016 and October 25, 2016, respectively;
ii) Part 2 on a Draft Plan of Survey prepared by Tham Surveying Ltd., under their Job No.
16-096-RPLAN 2 -GRID; Part 2 on a Draft Plan of Survey prepared by Tham Surveying
Ltd., under their Job No. 16-096-RPLAN 3 -GRID; Parts 1-24, inclusive, on a Draft Plan
of Survey prepared by Tham Surveying Ltd., under their Job No. 16-096-RPLAN
4 -GRID;
iii) Parcel 9, as shown on separate plans prepared by the City of Toronto Engineering and
Construction Services Department, Engineering Support Services, Land & Property
Surveys, Job No. 2016-04111, Map Sheets 52J-23 & 52K-13, dated November 16, 2016
and Map Sheets 52K-13 & 53K-12, dated November 17, 2016;
iv) Parts 3 and 4 on a Draft Plan of Survey prepared by the City of Toronto Engineering
and Construction Services Department, Engineering Support Services, Land &
Property Surveys, Job No. 2016-04444, Plan No. 1, dated November 9, 2016; and
v) Parts 1, 3, 4, 5, 6 and 9 on a Draft Plan of Survey prepared by the City of Toronto
Engineering and Constructed Services Department, Engineering Support Services,
Land & Property Surveys, Job No. 2016-04117, Plan No. 1, dated February 28, 2017,
City of Toronto (Toronto and East York Community Council Area);
THAT consideration be the nominal sum of $2.00; all legal, survey and other costs are to
be paid by the City of Toronto;
283
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from the
granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of the City of Toronto;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of the City of Toronto;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by the
City of Toronto prior to commencement of construction;
THAT said easement be subject to approval of the Minister of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction including obtaining any necessary approvals and signing and
execution of documents.
CARRIED
BACKGROUND
At Authority Meeting #11/08, held on January 30, 2009, Resolution #A314/08 was approved as
follows:
WHEREAS a very large sanitary sewer, known as the Coxwell trunk, in the City of Toronto
is showing signs of structural instability;
AND WHEREAS the City of Toronto is looking at all possible options for repair or
replacement of the damaged section of pipe, along with plans to twin the sewer in
accordance with the Wet Weather Flow Management Master Plan;
AND WHEREAS failure of the existing pipe could result in the diversion of sanitary
sewage to the Don River if alternative measures to contain the flow are not in place;
AND WHEREAS the Toronto and Region Conservation Authority (TRCA) wants to ensure
that every effort is made to contain the flows and avoid any diversion to the Don River, but
recognizes that an emergency response plan must be in place to deal with any diversion
that might occur should the pipe fail before a replacement mechanism for the damaged
section of pipe can be put in place;
THEREFORE LET IT BE RESOLVED THAT TRCA requests the City of Toronto to take
every possible action to protect the Don River from any possible sewage overflows;
THAT the Chief Administrative Officer be authorized to approve Ontario Regulation
166/06 permits to the City of Toronto for the Coxwell Sanitary Trunk Sewer to facilitate an
emergency overflow, a new section of sewer to bypass the damaged section, and any
emergency repairs and other works associated with the implementation of an emergency
response plan to deal with diversion, treatment and cleanup of any sewage flows to the
Don River and Harbour, should that become necessary between Executive Committee
meetings;
THAT the City of Toronto be requested to proceed with the twinning of the Coxwell trunk
as soon as possible as part of the City's comprehensive plan to reduce the frequency and
severity of combined sewer overflows;
THAT City of Toronto staff be requested to present the Emergency Response Plan to the
Authority once developed;
AND FURTHER THAT regular updates be provided to the Authority regarding the
Emergency Response Plan and any measures undertaken.
Furthermore, at Authority Meeting #8/09, held on October 23, 2009, Resolution #A183/09 was
approved as follows:
WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request
from the City of Toronto to provide a permanent easement for the Coxwell Sanitary Trunk
Sewer by-pass pipe, west of Coxwell Boulevard, north of O'Connor Drive (behind Barbara
Crescent), Don River watershed, City of Toronto (Toronto East York Community Council
Area);
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Toronto in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing a total of
0.20 hectares (0.49 acres), more or less, be granted to the City of Toronto for the Coxwell
Sanitary Trunk Sewer by-pass pipe, said land being west of Coxwell Boulevard, north of
O'Connor Drive (behind Barbara Crescent), City of Toronto (Toronto East York
Community Council Area), as shown on a plan entitled: EASEMENT REQUIREMENTS,
prepared by City of Toronto - Technical Services, Survey and Mapping, under their Job
No. 2009-0787-C, dated September 3, 2009;
THAT consideration be the nominal sum of $2.00, plus all legal, survey and other costs to
be paid by the City of Toronto;
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from the
granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigative measures being
carried out to the satisfaction of TRCA staff, at the expense of the City of Toronto;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and, where deemed appropriate by TRCA staff, a landscape plan be
prepared for TRCA staff review and approval in accordance with existing TRCA
landscaping guidelines;
THAT a permit pursuant to Ontario Regulation 166/06 be obtained prior to
commencement of construction;
THAT said easement be subject to approval of the Minister of Natural Resources in
accordance with Section 21(2) of the Conservation Authorities Act, R. S. 0. 1990, Chapter
C.27, as amended;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to give effect thereto, including the obtaining of necessary approvals and the
signing and execution of any documents.
The City of Toronto has formally requested permanent easements for the Coxwell Sanitary Trunk
Sewer Bypass Tunnel (CSTSBT) along various locations of the route within the Lower Don River
valley, from north of O'Connor Drive to Ashbridge's Bay.
In 1987, the International Joint Commission identified the City of Toronto's waterfront along Lake
Ontario as one of 43 polluted Areas of Concern in the Great Lakes Basin, largely due to impaired
water quality conditions in the Don River and the Inner Harbour. The discharges from combined
sewer overflows (CSOs) and storm sewers were identified as the principal sources of pollution.
In 2003, Toronto City Council approved a City-wide Wet Weather Flow Master Plan (WWFMP) to
mitigate the impacts of stormwater runoff and CSO (containing a mixture of untreated sewage and
polluted stormwater) discharges. The 25 year WWFMP identified a series of projects for
implementation, with the ultimate goal of improving water quality conditions and ecosystem health
in all six watersheds across the City and along the waterfront; thereby, advancing the delisting of
Toronto as an Area of Concern in the Great Lakes Basin.
In 2008, the Don and Waterfront Trunk Sewers and CSO Control Strategy Municipal Class
Environmental Assessment (also referred to as the Don River and Central Waterfront Project)
was initiated to provide a comprehensive systems integration approach in one complete project
under the WWFMP; the initial component of the project is the CSTSBT.
The CSTSBT consists of a 10.5 kilometre length of sewer, approximately 6.3 metres in diameter,
40 to 45 metres deep, and tunneled through bedrock. The tunnel will provide a bypass to the
entire, existing Coxwell Sanitary Trunk Sewer, the City's most critical trunk sanitary sewer
servicing approximately 30% of the City or approximately 750,000 residents.
During the Environmental Assessment investigations for the proposed CSTSBT, cracks were
found in the existing sanitary sewer pipe located in the vicinity of Coxwell Boulevard and Barbara
Crescent. To eliminate the imminent danger of raw sewage seeping from the existing cracked
sewer, a bypass pipe was immediately constructed at this location to prevent seepage of raw
sewage into the Don River; hence, the need for emergency permits being issued pursuant to
Ontario Regulation 166/06 at that time. However, the permanent easement for the bypass pipe
was never finalized and this section is being included for approval along with the various other
permanent easements required for the ultimate CSTSBT construction.
• •�
The CSTSBT will be located within the Regional Storm Flood Plain and Regulated Area of the
Lower Don River. A report pursuant to Ontario Regulation 166/06, as amended, for the project is
presented separately in this agenda.
The subject TRCA-owned lands were acquired from the Corporation of the Township of East York
on November 24, 1961; United Ceramics Ltd. on July 5, 1962; the Municipality of Metropolitan
Toronto on February 22, 1973, on September 23, 1980 and March 10, 1983; Torvalley
Development Ltd. on February 20, 1987; Domtar Inc. on December 14, 1989; Canadian National
Railway Company on November 29, 2000 and March 31, 2006; Metrolinx on January 15, 2010;
and Her Majesty the Queen in Right of the Province of Ontario on June 26, 2015, under the Don
River Flood Plain Lands Acquisition Project.
Plantings
All surface lands disturbed by construction will be stabilized and, where deemed
appropriate by TRCA staff, revegetated with native woody and herbaceous plant material
in accordance with existing TRCA landscaping guidelines. A landscape plan will be
prepared and form part of the permit pursuant to Ontario Regulation 166/06, as amended.
A plan illustrating the permanent easement locations is attached.
FINANCIAL DETAILS
The City of Toronto has agreed to assume all legal, survey and other costs involved in completing
this transaction.
Report prepared by: George Leja, extension 5342
Emails: gleia(atrca.on.ca
For Information contact: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: glela(cDtrca.on.ca, jtruesdell(a@trca.on.ca
Date: June 13, 2017
Attachments: 1
287
MILLWOOD RD
`k
'Subject
Propertw 's
V Subject
Property
SubjeW s
Prope�t ,�
L I,C-
LU
DVP
.N
UN
�. `• / Pi
i
Subject--
Nss �— Property
4;�
CIO���s�
Legend
VToronto and Region
Conservation YORK DURHAM
..... for The Living City
PEEL
L�
TORONTO
Lake oman.
RES.#B59/17 - CLAREMONT FIELD CENTRE PROJECT
Contract #10005225 Claremont Field Centre Project - Interior Renovations
and Fire Suppression Upgrade. Award of Contract #10005225 for the
supply of all labour, equipment and materials necessary for interior
renovations and building fire separation improvements at Claremont
Nature Centre, in the City of Pickering.
Moved by: Vincent Crisanti
Seconded by: Colleen Jordan
THAT Contract #10005225 for the supply of all labour, equipment and materials necessary
for interior renovations and building fire separation improvements at Claremont Nature
Centre, in the City of Pickering be awarded to MJ.K Construction Inc. at a total cost not to
exceed $245,435.00, plus HST, as they are the lowest bidder that best meets Toronto and
Region Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 25%
of the contract cost as a contingency allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA staff be directed to take any action necessary to
implement the contract including obtaining any required approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
Claremont Nature Centre (Claremont NC) is a 1,036 square metre panabode cedar log building
that opened in 1970 for overnight outdoor education programs.
At Authority Meeting #10/15, held on November 27, 2015, Resolution #A227/15 was approved, in
part, as follows:
...THAT TRCA education centres be redeveloped into community engagement centres
with an emphasis on local participation in program development and delivery,-...
Further, at Authority Meeting #5/17, held on June 23, 2017, Resolution #At 06/17 was approved,
in part, as follows, after the release of Tender #10005225 using the Claremont Field Centre
Project name:
THAT the Claremont Field Centre, a Toronto and Region Conservation Authority (TRCA)
owned and operated education facility located in the City of Pickering, be officially
renamed the "Claremont Nature Centre'...
As part of Claremont NC's transition into a community engagement hub, TRCA has identified the
need for renovation of the interior facilities and reprogramming of space to support the delivery of
new services to meet the changing needs and expectations of the community users. State of good
repair issues have also been identified and will need to be addressed in accordance with the Fire
Protection and Prevention Act.
some
The proposed interior renovation project will include the refurbishment of the existing classroom,
including new electrical and mechanical components, as well as upgrading the existing dormitory
space to include all new fire rated equipment and materials in order to comply with current Fire
Code. Once completed, the refurbished classroom will allow TRCA to provide improved
opportunities for community groups to better utilize this multiple use space. It is anticipated that
the range of new programs and uses will include private functions, meetings and events, including
exercise, meditation, music and art programs, amongst others. Additionally, the fire separation
upgrades will improve visitor and staff safety.
RATIONALE
Tender #10005225 was publicly advertised on the electronic procurement website Biddingo
(www.biddingo.com) on June 8, 2017 with a site information meeting held on June 13, 2017.
Tender packages were sent to the following 11 contractors:
Berkim Construction Inc.
EBS Construction Management;
Kolar Construction;
Lisgar Construction;
MIR Construction;
MJK Construction Inc.;
Pegah Construction Ltd.;
R -Chad Contracting Inc.;
Staybrite Inc.;
Stracor Inc.; and
Verna Corp.
The Procurement Opening Committee opened the Tenders on Friday, June 30, 2017 with the
following results:
BIDDERS
TOTAL TENDER AMOUNT
Plus HST
MJK Construction Inc.
$245,435.00
MIR Construction Inc.
$296,000.00
Verna Corp.
$330,000.00
Koler Construction Inc.
$422,004.00
Berkim Construction
$515,690.00
Six contractors declined the opportunity to submit a bid, being unable to meet the timelines and
specifications stated in the contract documents.
Restoration Services staff reviewed the bid received from MJK Construction Inc. against its own
cost estimate and has determined that the bid is of reasonable value and also meets the
requirements as outlined in the contract documents. Further assessment by TRCA staff of MJK
Construction Inc.'s experience and ability to undertake similar projects was conducted through
reference checks, which resulted in positive feedback that MJK Construction Inc. is capable of
undertaking the scope of work.
290
Based on the bids received, staff recommend that MJK Construction Inc. be awarded Contract
#10005225 for supply of all labour, materials and equipment necessary for interior renovations
and fire separation improvements at Claremont Nature Centre, in the City of Pickering for a total
cost not to exceed $245,435.00, plus a 25% contingency, plus HST, to be expended as
authorized by TRCA staff, it being the lowest bid that meets TRCA specifications. The 25%
contingency allowance is to cover any additional construction costs based on approved changes
necessitated by unforeseen site conditions.
FINANCIAL DETAILS
Funding for this project is provided by the Canada 150 Fund and Durham Region, account
435-05.
Report prepared by: Michelle Guy, 647-808-5809
Emails: mquV(cDtrca.on.ca
For Information contact: Joanne Jeffery, extension 5638
Emails: jlefferyC�trca.on.ca
Date: June 21, 2017
291
Section II — Items for Executive Action
RES.#660/17 - CARRUTHERS CREEK WATERSHED OAK RIDGES MORAINE
GROUNDWATER PROGRAM MONITORING WELL
Contract #10005143 - Carruthers ORMGP Monitoring. Award of Contract
#10005143 for drilling a nest of monitoring wells and extract core samples
in Carruthers Creek watershed. Purpose of the wells and core samples is
to gather data to support the Carruthers Creek Watershed Plan, the Oak
Ridges Moraine Groundwater Program and contribute to scientific research
related to the cored materials.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THAT Contract #10005143 to drill a nest of monitoring wells and extract core samples in
Carruthers Creek watershed be awarded on a preferred source basis to Aardvark Drilling
Incorporated at a total cost not to exceed $50,275, plus HST;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 10%
of the contract cost as a contingency allowance, if deemed necessary;
AND FURTHER THAT authorized TRCA officials be directed to take such action as is
necessary to implement the contract, including obtaining any required approvals and the
signing and execution of documents.
CARRIED
BACKGROUND
The opportunity to install a nest of monitoring wells in Carruthers Creek watershed is a welcome
outcome of the Region of Durham's funding for the Carruthers Creek Watershed Plan, as Toronto
and Region Conservation Authority (TRCA) currently has no monitoring wells in the watershed.
The wells will be an important mechanism to provide Carruthers Creek watershed groundwater
data to TRCA for the purposes of characterizing the watershed and analyzing its hydrogeology.
The cores from the drilled wells will also be significant as part of a regional database of geological
information which is accessed by the Oak Ridges Moraine Groundwater Program (ORMGP), the
Ontario Geologic Survey (OGS), the Geologic Survey of Canada (GSC), as well as academic and
other researchers.
The ORMGP will monitor the wells over the long-term, and results will be available to the
ORMGP's network, which includes other conservation authorities, OGS, GSC and other
researchers. Given the value of the data for both the Carruthers Creek watershed plan and the
larger regional context, the wells must be properly installed to yield reliable data over the
long-term, and the cores must be of suitable quality to facilitate future scientific study. Due to
these specific requirements, TRCA staff has consulted with ORMGP to retain a drilling contractor
with significant expertise and experience in this specialized work. ORMGP staff contacted the
recommended drilling contractor to get a quote for drilling the wells.
292
RATIONALE
ORMGP staff includes professional hydrogeologists who have been in practice since 1985, and
have the experience of working closely with the drilling industry with this type of expertise. In the
opinion of ORMGP staff, only a few drillers are able to collect the high quality soil and rock
samples when coring which are needed for OGS and GSC research purposes, and to install wells
which function reliably over the long-term. ORMGP staff also advised that lower cost drilling
companies may not actually be more cost effective in the end, due to poor core recovery and
groundwater monitoring wells which do not function as intended, and therefore yield unreliable, or
no, data.
Based on ORMGP staff recommendation, TRCA staff has determined that Aardvark Drilling
Incorporated is uniquely positioned to complete this work because they retain the best drilling
crews and have a proven track record working for the ORMGP, OGS and GSC.
Therefore, staff recommends that Contract #10005413 for the purpose of drilling a nest of
monitoring wells in the Carruthers Creek watershed and collecting core samples to be submitted
for storage and scientific study, be awarded to Aardvark Drilling Incorporated on a preferred
source basis.
The preferred source decision is in accordance with Section 9.3.3 of TRCA's Purchasing Policy
for non-competitive procurement, as follows:
The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably provided
by any other supplier.
FINANCIAL DETAILS
The cost of drilling and TRCA staff time to organize the drilling contract will be covered from the
hydrogeology study allocation, account 120-85 under the Carruthers Creek Watershed Plan, a
special fee-for-service project funded by the Region of Durham. ORMGP staff time to source the
drilling company and supervise the drilling to completion, and delivery of cores for storage, will be
covered as part of ORMGP's services to Durham Region. The ORMGP receives annual, direct
funding from the Region of Durham, as well as the regions of York and Peel, and the City of
Toronto.
Report prepared by: Maryam Nassar, extension 5937; Gary Bowen, 416-271-8944
Emails: mnassar(atrca.on.ca, gbowen(cMrca.on.ca
For Information contact: Maryam Nassar, extension 5937
Emails: mnassar(a)trca.on.ca
Date: June 23, 2017
293
RES.#B61/17 - IBM NOTES SOFTWARE DEVELOPMENT AND ADMINISTRATION
Award of Preferred Source Contract #10005142. Award of preferred
source Contract #10005142 for consulting services in support of ongoing
development and administration support of Toronto and Region
Conservation Authority's IBM Notes business applications.
Moved by: Mike Mattos
Seconded by: Vincent Crisanti
THAT Contract #10005142 be awarded to AppVision Inc. for a total cost not to exceed
$130,410.00, plus HST on a preferred source basis;
THAT Toronto and Region Conservation Authority (TRCA) staff be authorized to approve
additional expenditures to a maximum of 10% as a contingency allowance if deemed
necessary;
THAT the contract term end on December 31, 2018;
THAT the contract be on terms and conditions satisfactory to TRCA staff including
performance by the contractor satisfactory to TRCA at its sole discretion;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to implement the contract including signing and execution of documents.
CARRIED
BACKGROUND
TRCA currently uses IBM Notes for a variety of business applications, including e-mail, resource
management, accounting services, planning and development, and human resources
administration. To date, over 40 custom applications have been developed and the email
communications platform has over 700 user accounts. TRCA will require the assistance from an
IBM Notes consulting firm to continue to develop new applications, troubleshoot and perform
maintenance on a number of existing IBM Notes applications. The consultant will enhance
existing applications by migrating to an internet browser based platform in order to increase
flexibility for the end user. The consultant will also provide technical assistance to TRCA
Information Systems staff in performing key upgrades to its Notes/Domino servers. Finally, the
consultant will assist in the migration and integration of existing IBM Notes applications with
TRCA's financial software Agresso Business World.
RATIONALE
TRCA has utilized the services of AppVision for the last 15 years. As a result, AppVision has
extensive knowledge of TRCA business processes and technology infrastructure. Therefore, staff
recommends that Contract #10005142 be awarded to AppVision Inc. on a preferred source basis
for a total cost not to exceed $130,410.00, plus 10% contingency, plus HST. Approval to retain
AppVision Inc. on a preferred source basis is in compliance with TRCA's purchasing policy under
Section 9.3 (3) which states:
The required goods and services are to be supplied by a particular vendor or supplier
having special knowledge, skills, expertise or experience that cannot be provided by any
other supplier.
294
AppVision Inc. has demonstrated the ability to conduct effective "business process discovery"
software solution development, subsequent application deployment and "bug fixes" in a cost
effective and timely manner. Other consulting firms do provide IBM Notes services, however,
AppVision's extensive knowledge of TRCA businesses and technology infrastructure is critical to
the rapid development of IBM Notes applications to improve business efficiency.
FINANCIAL DETAILS
The upset limit for this contract is $130,410.00, plus 10% contingency, plus HST. Funds are
available in TRCA's 2017 and 2018 IT capital budget account 014-01 from TRCA's municipal
funding partners.
DETAILS OF WORK TO BE DONE
The term of the contract will be from July 2017 to December 2018. The Consultant's work plan
includes the following:
Perform regular maintenance, roll over/amend required annual databases, and link to the
other applications for a number of existing applications;
Perform ongoing enhancements to existing applications, including transition to an internet
browser -based platform;
Migrate and integrate a number of existing applications with Agresso Business World; and
Provide technical assistance to TRCA IT staff performing key upgrades to Notes/Domino
servers to better support the changing email and smartphone landscape as well as
meeting the demands of increasing data volumes and its effect on data back-up, disaster
recovery and security.
Report prepared by: Chris Gerstenkorn, extension 5347
Emails: cgerstenkorn(?�trca.on.ca
For Information contact: Chris Gerstenkorn, extension 5347
Emails: cgerstenkorn(atrca.on.ca
Date: June 14, 2017
295
RES.#B62/17 - OFFICE AND PAPER SUPPLIES
Contract #10005413 - Vendor of Record. Award of contract for purchase of
office supplies
Moved by: Jack Ballinger
Seconded by: Jack Heath
THAT Contract #10005413 for the Vendor of Record for office and paper supplies be
awarded to NOVEXCO Inc. for a the period of July 15, 2017 to April 30, 2020, with the
option to extend the agreement for up to two additional terms of one year each, subject to
satisfactory performance, at a total cost not to exceed $150,000, plus 15% contingency,
plus HST.
CARRIED
BACKGROUND
Toronto and Region Conservation Authority (TRCA) procures a variety of office supplies including
paper and envelope products for use by TRCA staff at various locations. Staff has used the City
of Toronto Vendor of Record (VOR) arrangement for many years and has benefitted from its
favourable pricing. In reviewing this purchasing arrangement, staff compared the Toronto
contracts with the Province of Ontario's VOR contracts to obtain best value.
The City of Toronto VOR for office supplies expired on March 31, 2017, and for paper products on
June 30, 2017, and since that point TRCA has continued to purchase from the approved vendors,
Corporate Express and Spicers, respectively, but for many products at higher rates than in the
original contracts. The City of Toronto has advised that it does not have a timeline for completion
of a new Request for Quotation process for subsequent years, and as a result the current higher
prices also apply to TRCA.
TRCA staff has reviewed the recently completed combined provincial VOR for office supplies and
paper products. The results compared to the current City of Toronto arrangements indicate
there can be significant savings by going with the provincial arrangement, and one company can
supply most of TRCA needs, opposed to two vendors under the Toronto agreements.
RATIONALE
This Province's Request for Bids (RFB) opportunity was posted on the Ontario Tenders Portal.
Four companies responded to the RFB and the Province awarded the contract to NOVEXCO Inc.
as it was the lowest bidder meeting specifications. The provincial VOR arrangement took effect
on May 1, 2017 and expires on April 30, 2020. The term of this agreement is for period of three
years with the option to extend the agreement for up to two additional terms of one year each at
the discretion of The Ministry of Government and Consumer Services (MGCS).
Based on the volume of 2016 purchases and expected growth, staff estimates costs to be a
maximum of $150,000 for the entire five year period, plus 15% contingency, under the NOVEXCO
contract. This is an approximate savings of more than 50% from the City of Toronto
arrangement. There are very few regularly purchased office supply and paper product items not
included in the NOVEXCO contract, and in the instances that such products are required, staff will
review NOVEXCO availability and pricing, as well as other suppliers as required, to obtain best
value.
• e
As a result, TRCA staff is seeking approval to award Contract #10005413 for the Vendor of
Record for office and paper supplies to NOVEXCO Inc. for a the period of July 15, 2017 to April
30, 2020, with the option to extend the agreement for up to two additional terms of one year each,
subject to satisfactory performance, at a cost not to exceed $150,000, plus 15% contingency, plus
HST ($30,000 per year, plus contingency and HST).
FINANCIAL DETAILS
The majority of purchases are made by Office Services staff using the corporate account of
001-05, funded by TRCA's municipal funding partners. Additional purchases are made by
various office locations and for special order items from various TRCA account codes, covered by
various funding sources.
Report prepared by: Kathy Stranks, extension 5264
Emails: kstranks(5trca.on.ca
For Information contact: Kathy Stranks, extension 5264,
Rea Lingo-Santaguida, extension 5776
Emails: kstranksotrca.on.ca, rlingo-santaguidaotrca.on.ca
Date: July 4, 2017
297
Section IV — Ontario Regulation 166/06, As Amended
RES.#663/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Vincent Crisanti
Seconded by: Jack Heath
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.5 and 10.10 — 1014 which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.5 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
10.1 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere, northwest of Victoria Park Avenue and Eglinton Avenue East, in the City of
Toronto (North York Community Council Area), Don River Watershed, as located on
property owned by the City of Toronto and Hydro One Networks Incorporated. The
purpose is to construct a multi -use trail extension. Works will involve construction of a
new asphalt trail in an existing hydro corridor. No in -water works are within the scope of
this project.
CFN: 57276 - Application #: 0481/17/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Daniel Brent 5774 dbrent@trca.on.ca
Date: June 28, 2017
KOM
TOWN OF RICHMOND HILL
10.2 27 AUBREY AVENUE
To construct, reconstruct, erect or place a building or structure on Part Lot 57, Plan 202,
(27 Aubrey Avenue), in the Town of Richmond Hill, Humber River Watershed. The
purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 41 sq.m (441.32 sq.ft) rear addition
and 94 sq.m (1011.81 sq.ft) attached garage to an existing dwelling, associated with a
municipal building permit.
CFN: 55550 - Application #: 0222/161RH
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: June 28, 2017
TOWN OF RICHMOND HILL
10.3 86 HEADWATER CRESCENT
To construct, reconstruct, erect or place a building or structure on Lot 12, Plan, (86
Headwater Crescent), in the Town of Richmond Hill, Humber River Watershed. The
purpose is to recognize the recent construction of a 24 square metre (258.33 square
feet) deck at the rear of an existing dwelling within TRCA's Regulated Area of the
Humber River Watershed.
CFN: 57925 - Application #: 0642/17/RH
Report Prepared by: Aidan Pereira 5723 apereira@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 9, 2017
TOWN OF RICHMOND HILL
10.4 LESLIE ELGIN DEVELOPMENTS INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Lot 26, 27, 22,
Concession 3, (10961 Leslie Street and 11121 Leslie Street (Site 1) and East of
Performance Drive (Site 2)), in the Town of Richmond Hill, Rouge River Watershed as
located on the property owned by Leslie Elgin Developments Inc.. The purpose is to
undertake works within a TRCA Regulated Area of the Rouge River Watershed in order
to facilitate a culvert removal and channel restoration in support of an overall benefit to
Redside Dace - ESA sl 7(2)(c).
CFN: 57896 - Application #: 0586/17/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 30, 2017
299
TOWN OF RICHMOND HILL
10.5 MATTAMY HOMES
To construct, reconstruct, erect or place a building or structure, change a building or
structure so that it alters its use or potential use, increases its size or increases the
number of dwelling units, site grade, temporarily or permanently place, dump or remove
any material, originating on the site or elsewhere and interfere with a wetland on Lot 28,
Concession 2, (Leslie Street from Elgin Mills Road East to 19th Avenue and 19th
Avenue from Leslie Street to 1 km east of Leslie Street), in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by Mattamy Homes. The
purpose is to undertake Phase 1 works of the external spine servicing network (ESSN),
consisting of a new watermain connection for the North Leslie community in the Town of
Richmond Hill.
CFN: 57734 - Application #: 0443/17/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 30, 2017
RES.#664/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED — ERRATA APPLICATIONS
Moved by: Vincent Crisanti
Seconded by: Jack Heath
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
applications 10.6 —10.8 that had been scheduled on the agenda as errata applications,
for which all the required information was received and finalized.
CARRIED
PERMIT APPLICATIONS EX10.6 - EX10.8 MAJOR APPLICATIONS - ERRATA
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency works, resolution of violations/after the fact permits, trail construction.
CITY OF MARKHAM
10.6 CONDOR PROPERTIES LTD.
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere
and alter a watercourse on Lot 27, 28, 104 - 107, Plan 2366, (near Yonge Street and
Highway 7), in the City of Markham, Don River Watershed as located on the property
owned by Condor Properties Ltd.. The purpose is to alter a watercourse and develop
within a Regulated area to facilitate the creation of an interim, realigned watercourse
corridor through the proposed Langstaff community.
300
CFN: 57903 - Application #: 0603/17/MARK
Report Prepared by: Quentin Hanchard 5324 ghanchard@trca.on.ca
For information contact: Quentin Hanchard 5324 ghanchard@trca.on.ca
Date: June 29, 2017
TOWN OF RICHMOND HILL
10.7 128 WELDRICK ROAD WEST
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Lot 87, Plan 1923, (128 Weldrick Road West), in the Town of Richmond
Hill, Don River Watershed. The purpose is to conduct minor grading works and
restoration plantings to address unauthorized works conducted within a Regulated Area
of the Don River watershed at 128 Weldrick Road West in the Town of Richmond Hill.
CFN: 54015 - Application #: 0471/15/RH
Report Prepared by: Anthony Sun 5724 asun@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 28, 2017
TOWN OF RICHMOND HILL
10.8 259 LAKELAND CRESCENT
To construct, reconstruct, erect or place a building or structure and site grade on, (259
Lakeland Crescent), in the Town of Richmond Hill, Humber River Watershed. The
purpose is to construct a replacement dwelling, conduct associated minor grading works
and restoration plantings within a Regulated Area of the Humber River watershed at 259
Lakeland Crescent in the Town of Richmond Hill.
CFN: 58100 - Application #: 0723/17/RH
Report Prepared by: Anthony Sun 5724 asun@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: June 28, 2017
RES.#665/17 - STANDARD DELEGATED PERMITS
Moved by: Vincent Crisanti
Seconded by: Jack Heath
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
301
10.9 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits, including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF BRAMPTON
2098330 ONTARIO INC. - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 739.05 sq.m (7,955 sq.ft) addition and
parking area at the rear of an existing industrial building associated with a municipal Site Plan
application (City file: SP 16-009) and building permit.
CFN: 56342 - Application #: 0805/16/13RAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 28, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to install a new watermain alongside an existing watermain between Harold
Street and Ambleside Drive in the City of Brampton. The warm water construction timing
window will be applied to this project.
CFN: 56595 - Application #: 1111/16/13RAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: May 29, 2017
CITY OF MARKHAM
CIM MACKENZIE CREEK INC. - Rouge River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed in order to undertake site alteration, grading works and installation of servicing in
support of an approved draft plan of subdivision (19TM-14014 - CIM Global Development LP)
CFN: 57394 - Application #: 0164/17/MARK
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 13, 2017
302
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake site restoration and erosion protection at two sites, including the
removal of a relic dam structure at Site 1 and restoration and reconfiguration of a stormwater
outlet and channel design at site 9, near Clegg Road and Rodick Road, in the City of Markham,
Rouge River Watershed as located on property owned by the City of Markham and Exelerence
Holdings Inc. and Hydro One Networks Inc. with landowner authorization. In -water and near -
water works are proposed and the Ministry of Natural Resources and Forestry (MNRF) Redside
Dace timing window will apply to this project, unless otherwise specified in writing by MNRF.
CFN: 56832 - Application #: 0029/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 1, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to conduct erosion and stream restoration works that is currently obstructing the
channel at Robinson Creek on 1 Cedar Valley Park and Raymerville Drive, near Markham Road
and Highway 7, in the City of Markham. The Ministry of Natural Resources and Forestry
(MNRF) Redside Dace Timing Window applies, unless otherwise specified in writing by MNRF.
CFN: 56923 - Application #: 0090/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 31, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake erosion and restoration works at Robinson Creek and the Rouge
River and to protect loss of property at the Markham Green Golf Course at three locations north
of 14th Avenue and south of Rouge Bank Drive in the City of Markham. The warm water
construction timing window will apply.
CFN: 56925 - Application #: 0094/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 30, 2017
IDEAL DEVELOPMENTS INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two-storey replacement dwelling with a rear
deck and septic system.
CFN: 57904 - Application #: 0577/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 13, 2017
303
IDEAL DEVELOPMENTS INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two-storey replacement dwelling with a rear
deck and septic system.
CFN: 57905 - Application #: 0601/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 13, 2017
9 ECKARDT AVENUE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to remove an existing shed and garage, in order to facilitate the construction of a
two-storey addition to an existing dwelling. The two-storey addition will be approximately 417.94
square metres (4498.67 square feet) in size.
CFN: 57233 - Application #: 0091/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 8, 2017
3 MAYHEW LANE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 613 sq.m (6,598.28 sq.ft) addition/second
storey renovation to the existing dwelling and backyard terrace associated with a municipal Site
Plan application (SC 16 175166) and building permit.
CFN: 54756 - Application #: 1003/15/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: October 27, 2015
CITY OF MISSISSAUGA
6918 JUSTINE DRIVE - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 232.57 sq. m (2,503.36 sq. ft.) residential
dwelling, a 3.9 sq. m (41.97 sq. ft.) porch, and a 15.92 sq. m (171.36 sq. ft.) deck located at
6918 Justine Drive, in the City of Mississauga associated with a municipal building permit.
CFN: 57770 - Application #: 0494/17/MISS
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: June 19, 2017
304
CITY OF PICKERING
87 FINCH AVENUE - Petticoat Creek Watershed
The purpose is to carry out site grading and construct a new two-storey single family detached
dwelling with a detached garage, poolhouse and inground pool in the rear yard at 87 Finch
Avenue in the City of Pickering.
CFN: 57498 - Application #: 0279/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: March 13, 2017
ROUGEMOUNT CO-OPERATIVE HOMES INC. - Petticoat Creek Watershed
The purpose is to replace the patio and pathway, and undertake landscaping and minor site
grading the rear of the existing residential apartment building at 400 Kingston Road in the City
of Pickering.
CFN: 57767 - Application #: 0463/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 26, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
29 LAKE PROMENADE - Waterfront Watershed
The purpose is to construct a new two-storey single family detached dwelling at 29 Lake
Promenade. The existing dwelling is to be demolished.
CFN: 56205 - Application #: 0700/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 1, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to repair a segment of sanitary sewer along Emery Creek, south of Lanyard
Road, near Weston Road and Finch Avenue West. Works will involve replacement of sewer
infrastructure, followed by restoration of the site. This permit was issued in accordance with
TRCA's Permission for Emergency Infrastructure Works Review Protocol (Authority Res.
#A105/15). Due to the emergency nature of the works, a construction timing window will not
apply.
CFN: 57794 - Application #: 0629/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: June 12, 2017
305
4 MOSSOM PLACE - Humber River Watershed
The purpose is to construct a small one -storey addition including basement at the front of the
existing dwelling at 4 Mossom Place in the City of Toronto (Etobicoke York).
CFN: 58102 - Application #: 0720/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 21, 2017
130 SATURN ROAD - Etobicoke Creek Watershed
The purpose is to construct a second storey addition above the existing one -storey single family
detached dwelling at 130 Saturn Road in Toronto (Etobicoke York).
CFN: 57912 - Application #: 0598/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 30, 2017
39B EAST DRIVE - Humber River Watershed
The purpose is to construct of a new semi-detached residential dwelling unit at 39B East Drive
in the City of Toronto (Etobicoke York). The existing single family detached dwelling is to be
demolished.
CFN: 56030 - Application #: 0604/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 28, 2017
39A East Drive - Humber River Watershed
The purpose is to construct of a new semi-detached residential dwelling unit at 39A East Drive
in the City of Toronto (Etobicoke York). The existing single family detached dwelling is to be
demolished.
CFN: 56031 - Application #: 0607/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 28, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Don River Watershed
The purpose is to carry out storm sewer replacement at 25 Old Eglinton Avenue, near
Bermondsey Road and Eglinton Avenue East. Works will involve removal and replacement of
the existing storm sewers, followed by restoration of the site. No in -water works are within the
scope of this project.
306
CFN: 56797 - Application #: 0104/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: June 12, 2017
9 OXBOW ROAD - Don River Watershed
The purpose is to construct a two-storey replacement dwelling with rear terrace at 9 Oxbow
Road in the City of Toronto (North York Community Council Area).
CFN: 55898 - Application #: 0494/161TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 9, 2017
HAVERGAL COLLEGE - Don River Watershed
The purpose is to construct an addition to the existing Junior school as well as an addition to the
existing Upper School. Also proposed is the installation of new associated private services and
improvements to the existing surface parking facilities.
CFN: 58004 - Application #: 0659/17/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 22, 2017
48 ARJAY CRESCENT - Don River Watershed
The purpose is to construct a rear deck with basement walk -out to the rear of the recently
constructed replacement dwelling located at 48 Arjay Crescent in the City of Toronto (North
York Community Council Area).
CFN: 57493 - Application #: 0276/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 16, 2017
REALSTAR MANAGEMENT - Don River Watershed
The purpose is to decommission an existing concrete swimming pool, remove the existing
change house and concrete patio and convert the area to an outdoor patio/amenity area.
CFN: 57865 - Application #: 0534/17/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 28, 2017
307
SANOFI PASTEUR LIMITED - Don River Watershed
The purpose is to construct a manufacturing facility and associated improvements including
asphalt parking, internal roads, servicing and landscaping. The first phase of site work involves
excavation work associated with a stage 2 - 3 archeological investigation.
CFN: 57803 - Application #: 0493/17/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 13, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Highland Creek Watershed
The purpose is to realign a segment of channel to protect existing sanitary sewers in Hague
Park, located near McCowan Road and Lawrence Avenue East. Works will involve
reconstruction of the channel and relocation of sewer infrastructure, followed by restoration of
the site. This permit was issued in accordance with TRCA's Permission for Emergency
Infrastructure Works Review Protocol (Authority Res. #A105/15). The warm water construction
timing window of July 1 to March 31 will apply to this proposal.
CFN: 47699 - Application #: 0490/12/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: May 29, 2017
455 ROUGE HILLS DRIVE - Rouge River Watershed
The purpose is to construct a two-storey replacement dwelling with rear deck and basement
walkout at 455 Rouge Hills Drive in Toronto (Scarborough Community Council Area).
CFN: 57704 - Application #: 0398/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: May 31, 2017
10 MEADOWCLIFFE ROAD - Waterfront Watershed
The purpose is to construct a three-storey replacement dwelling with rear patios, in -ground
swimming pool and associated landscaping at 10 Meadowcliffe Drive in the City of Toronto
(Scarborough Community Council Area).
CFN: 56476 - Application #: 0924/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 9, 2017
MOUNT PLEASANT GROUP OF CEMETERIES - Don River Watershed
The purpose is to construct a replacement maintenance building at Pine Hills Cemetery (625
Birchmount Road) in the City of Toronto (Scarborough Community Council Area).
RTIFee
CFN: 57402 - Application #: 0172/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 15, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Don River Watershed
The purpose is to install a new bridge carrying pedestrian and cycling traffic over Taylor Massey
Creek, just before its confluence with the East Don River, near Don Mills Road and the Don
Valley Parkway. The warm water construction timing window of July 1 to March 31 will apply to
this proposal.
CFN: 57270 - Application #: 0251/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: June 30, 2017
ENBRIDGE GAS DISTRIBUTION INC. - Don River Watershed
The purpose is to perform remediation work on an embankment. The warm water construction
timing window will apply to this project.
CFN: 57569 - Application #: 0480/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 19, 2017
CITY OF VAUGHAN
CITY OF VAUGHAN - Humber River Watershed
The purpose is to rehabilitate the existing collapsed armour stone retaining wall adjacent to 30
Intersite Place near Pine Valley Drive and Langstaff Road. The Redside Dace timing window of
July 1 to September 15 will apply to this proposal unless otherwise specified in writing by
Ministry of Natural Resources and Forestry (MNRF).
CFN: 56658 - Application #: 1231/16/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: June 26, 2017
CLUSTERGARDENS ESTATES INC. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of two (2) multi -unit residential buildings and an
underground parking structure associated with a 42 unit townhouse development at the
southwestern corner of Springside Road and Parktree Drive, in the City of Vaughan.
309
CFN: 57985 - Application #: 0656/17/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 7, 2017
ENZA REALTY LIMITED - Humber River Watershed
The purpose is to permit development within a Regulated Area of the Humber River Watershed
to facilitate site alteration and the construction of a one -storey addition to the front of the existing
Montessori School of Kleinburg at 10515 Highway No. 27, in the City of Vaughan. The proposal
also includes a one -storey addition to the rear of the building for one classroom and a new
entrance, as well as associated landscaping and restoration.
CFN: 40188 - Application #: 928/07/VAUG
Report Prepared by: Mark Andrews, extension 5936, email mandrews@trca.on.ca
For information contact: Mark Andrews, extension 5936, email mandrews@trca.on.ca
Date: June 2, 2017
78 RUMSEY ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 704 sq. m (7586 sq. ft.) 3 -storey addition to an existing
single family residential dwelling, a 33.95 sq. m (365.43 sq. ft.) deck and a stone patio area,
associated with a municipal building permit. The subject works are located on lands known
municipally as 78 Rumsey Road, in the City of Vaughan.
CFN: 56314 - Application #: 0755/16NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 12, 2017
118 WILLIS ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 312.57 sq. m. (3364.47 sq. ft.) replacement
single family dwelling associated with a municipal building permit. The subject property is
located on lands known municipally as 118 Willis Road in the City of Vaughan.
CFN: 55544 - Application #: 0204/16/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 6, 2017
30 PATNA CRESCENT - Don River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River Watershed, the
development of a 5.7 sq. m. (61.35 sq. ft.) cold cellar covered by a porch and roof extension on
lands known municipally as 30 Patna Crescent, in the City of Vaughan.
310
CFN: 58109 - Application #: 0732/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: June 28, 2017
273 MILANI BOULEVARD - Humber River Watershed
The purpose is to permit development within a Regulated Area of the Humber River Watershed
to facilitate site development and the construction of a parking lot and landscaping at 273 Milani
Boulevard, in the City of Vaughan. A new, two-storey 2,319.37 sq. m (24,966 sq. ft.) autobody
and service repair shop, additional parking area and landscaping is also being constructed on
the site, but beyond the TRCA's Regulated Area.
CFN: 55961 - Application #: 0509/16/VAUG
Report Prepared by: Mark Andrews, extension 5936, email mandrews@trca.on.ca
For information contact: Mark Andrews, extension 5936, email mandrews@trca.on.ca
Date: June 15, 2017
TOWN OF AJAX
CLAREMONT STOREHOUSE INC. - Carruthers Creek Watershed
The purpose is to undertake works to facilitate topsoil stripping, site grading, filling and the
installation of stormwater infrastructure on a vacant industrial lot at 285 Achilles Road in the
Town of Ajax. This proposal is the first phase of work associated with a Site Plan application
and the future development of a car dealership facility.
CFN: 57447 - Application #: 0214/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 28, 2017
TOWN OF CALEDON
14 FILTON ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 4.87 m (16 ft) by 9.75 m (32 ft) in -ground
pool and stone patio area located at the rear of an existing residential dwelling associated with a
municipal building permit.
CFN: 57901 - Application #: 0617/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: June 23, 2017
311
10150 CASTLEDERG SIDE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 130.81 sq.m (1,408 sq.ft) dwelling and
septic system associated with a municipal Site Plan application (Town File: SPA 17-0019) and
building permit.
CFN: 57792 - Application #: 0619/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 5, 2017
6780 CASTLEDERG SIDE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a geothermal field associated with a
municipal Site Plan application (SPA 17-33) and building permit. The geothermal field will be
located in the vicinity of a new dwelling, which was considered under a municipal Site Plan
application (SPA 16-09).
CFN: 57818 - Application #: 0518/171CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 22, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to rehabilitate Highway 50 from Old Church Road to Highway 9, in the Town of
Caledon. The cold water construction timing window will apply to this project.
CFN: 57482 - Application #: 0239/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: June 20, 2017
TOWN OF RICHMOND HILL
ELGIN MILLS CEMETERY C/O MOUNT PLEASANT GROUP OF CEMETERIES - Rouge
River Watershed
The purpose is to construct a new bridge crossing associated with an expansion to the Elgin
Mills Cemetery.
CFN: 55405 - Application #: 0143/16/RH
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: June 6, 2017
312
47 DRYNOCH AVENUE - Humber River Watershed
The purpose is to undertake works in TRCA's Regulated Area of the Wilcox -St. George Wetland
Complex within the Humber River Watershed to facilitate the construction of a two storey
replacement dwelling approximately 226.22 square metres in size and a deck on the subject
property.
CFN: 57636 - Application #: 0519/171RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 30, 2017
MOUNT PLEASANT GROUP OF CEMETERIES - Rouge River Watershed
The purpose is to modify existing grades, place fill and install servicing associated with the
expansion of an existing cemetery operation.
CFN: 57449 - Application #: 0225/17/RH
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: June 9, 2017
REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed
The purpose is to construct a new sanitary sewer connection within the Leslie Street right-of-
way to service the West Gormley community.
CFN: 57763 - Application #: 0459/171RH
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: June 25, 2017
19 GEORGE STREET - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the demolition of an existing dwelling and the construction of a
new 4106 square foot (381 square metre) two-storey dwelling, with a deck on the subject
property.
CFN: 57223 - Application #: 0088/17/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 8, 2017
TOWN OF RICHMOND HILL - Don River Watershed
The purpose is to replace the existing 200 mm cast iron watermain with a 200 mm PVC
watermain within the existing road right-of-way (ROW) of Trench Street from Major Mackenzie
Drive West to immediately north of Mill Street, The Redside Dace timing window of July 1 to
September 15 will apply to this proposal unless otherwise specified in writing by Ministry of
Natural Resources and Forestry (MNRF).
313
CFN: 56825 - Application #: 0021/17/RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: June 6, 2017
TOWN OF RICHMOND HILL - Don River Watershed
The purpose is to replace the existing 150mm cast iron watermain with a 200mm PVC
watermain within the existing road right-of-way (ROW) of Kersey Crescent between Weldrick
Road West and May Avenue. The Redside Dace timing window of July 1 to September 15 will
apply to this proposal unless otherwise specified in writing by Ministry of Natural Resources and
Forestry (MNRF).
CFN: 56826 - Application #: 0022/171RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: June 6, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
29 WARDEN LANE RR4 - Rouge River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Rouge River watershed, the
replacement of existing retaining walls and landscaping associated with an existing pool, the
development of two pergola structures on the existing patio area, and the development of an
approximately 71 sq. m. (768sq. ft.) putting green on lands known municipally as 29 Warden
Lane, in the Town of Whitchurch-Stouffville.
CFN: 58005 - Application #: 0658/17/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 12, 2017
TOWN OF WHITCHURCH-STOUFFVILLE - Duffins Creek Watershed
The purpose is to reconstruct a road and replace a sanitary sewer and watermain, install a new
storm sewer and eliminate ditches within the road right-of-way as well as install new curb and
sidewalks on Burkholder Street from Russel Avenue to Franklin Street in the Town of
Whitch urch-Stouffville, Duffins Creek Watershed on property owned by the Town of Whitchurch-
Stouffville.
CFN: 54564 - Application #: 0250/17/WS
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 23, 2017
314
TOWNSHIP OF KING
61 AUSTIN RUMBLE COURT - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 110.36 sq. m. (1187.9 sq. ft.) cabana and garage, an associated driveway, a
55 sq. m. (592 sq. ft.) pool, and associated landscaping on lands known municipally as 61
Austin Rumble Court, in the Township of King.
CFN: 58023 - Application #: 0653/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 7, 2017
3595 16TH SIDEROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of additions to an existing dwelling, a garage, a
deck, and a new septic system associated with a municipal building permit. The subject property
is located on lands known municipally as 3595 16th Sideroad in the Township of King.
CFN: 57868 - Application #: 0537/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Polina Barn, extension 5256, email polina.bam@trca.on.ca
Date: June 21, 2017
5529 15TH SIDEROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 417.04 sq.m. (4,488.98 sq.ft.) single family
dwelling and a septic system associated with a municipal building permit. The subject property
is located on lands known municipally as 5529 15th Sideroad in the Township of King.
CFN: 57634 - Application #: 0465/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Polina Barn, extension 5256, email pollna.bam@trca.on.ca
Date: June 6, 2017
63 AUSTIN RUMBLE COURT - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 56 sq. m. (602.7 sq. ft.) garage and associated driveway, a 66 sq. m. (710.4
sq. ft.) in -ground pool and associated landscaping, a 49.5 sq. m. (532.8 sq. ft.) Cabana, and an
approximately 92 sq. m. (1000sq. ft.) basement expansion on lands known municipally as 63
Austin Rumble Court, in the Township of King.
CFN: 58036 - Application #: 0667/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 16, 2017
315
15425 11TH CONCESSION -Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 115.58 sq.m. (1,244 sq.ft.) addition, a
basement extension, a driveway alteration, and a new sewage septic system associated with a
municipal building permit. The subject property is located on lands municipally known at 15425
11th Concession in the Township of King.
CFN: 58007 - Application #: 0652/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 4, 2017
TOWNSHIP OF KING - Humber River Watershed
The purpose is to undertake construction of a pedestrian bridge approximately 11 m long and
2m wide east of Highway 27 and north of Hill Farm Road.
CFN: 55769 - Application #: 0378/161KING
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: May 29, 2016
YMCA OF GREATER TORONTO - Humber River Watershed
The purpose is to permit development within a Regulated Area of the Humber River Watershed
to facilitate site development and the construction of four (4) seasonal cabins measuring 50.28
sq. m (541.21 sq. ft.) and landscaping at 13300 11th Concession (YMCA Cedar Glen), in the
Township of King. The proposed cabins will be used for day camp programs and activities,
including seasonal overnight accommodations, mainly in the late spring and summer.
CFN: 58014 - Application #: 0657/171KING
Report Prepared by: Mark Andrews, extension 5936, email mandrews@trca.on.ca
For information contact: Mark Andrews, extension 5936, email mandrews@trca.on.ca
Date: June 15, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
316
CITY OF BRAMPTON
TRANSCANADA PIPELINES LTD.
To undertake structure maintenance along a TransCanada Pipeline Ltd. right of way (site MLV
202-2+4.2), located west of Airport Road and north of Sandalwood Parkway East, in the City of
Brampton, Humber River Watershed as located on property owned by the City of Brampton with
access granted through a permission to enter. The purpose is to undertake an integrity dig
along a TransCanada Pipeline Ltd. right of way (site MLV 202-2+4.2), located west of Airport
Road and north of Sandalwood Parkway East, in the City of Brampton, in order to conduct
repairs to an existing pipeline. The Redside Dace construction timing window will apply to this
project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry
(MNRF).
CFN: 57687 - Application #: 04061171BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: June 30, 2017
CITY OF MARKHAM
REGIONAL MUNICIPALITY OF YORK
To undertake road and pathway resurfacing or reconstruction in German Mills Settler's Park,
near Steeles Avenue and Leslie Street, and along Leslie Street north of Rosemount Avenue, in
the City of Markham, Don River Watershed as located on the property owned by the City of
Markham. The purpose is to construct a multi -use pathway by removing and replacing the
existing sidewalks and installing a guard rail on the west side of Leslie Street, at the Cummer
Creek crossing, north of Rosemount Avenue; paving an existing gravel path, replacing an
existing wooden handrail with a chain link fence and replacing an existing wooden retaining wall
in German Mills Settlers Park, in the City of Markham, on lands owned by the City of Markham
with access granted through a permission to enter.
CFN: 55512 - Application #: 0236/16/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 28, 2017
CITY OF PICKERING
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
and to undertake sewer, watermain or utility watercourse crossing by trenchless technology
along Finch Avenue - from Nature Haven Crescent to Altona Road, in the City of Pickering,
Petticoat Creek Watershed as located on property owned by the City of Pickering. The purpose
is to install 100 mm diameter conduits along Finch Avenue, from Nature Haven Crescent to
Altona Road, in the City of Pickering. The warm water construction timing window will apply to
this project.
317
CFN: 56468 - Application #: 0919/16/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: July 4, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Enfield Avenue and 73 and 75 Enfield Avenue, in the City of Toronto (Etobicoke York
Community Council Area), Etobicoke Creek Watershed as located on privately owned property
and property owned by the City of Toronto. The purpose is to place conduit. No in -water work is
within the scope of this project.
CFN: 57152 - Application #: 0030/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 26, 2017
COGECO PEER 1
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Jane Street, from north of Wilson Avenue to Gordon Mackay Road, and 2050 Jane Street,
near Wilson Avenue, in the City of Toronto (Etobicoke York Community Council Area), Humber
River Watershed as located on property owned by the City of Toronto and Toronto Police
Service. The purpose is to install conduit, manhole and handwells. The warm water timing
window of July 1 st to March 31 st will apply to this project.
CFN: 57656 - Application #: 0440/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 26, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Dundas Street West, Humber Hill Avenue and Old Dundas Street, in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed as located on property
owned by the City of Toronto. The purpose is to install conduit and grade level boxes. No in -
water work is within the scope of this project.
CFN: 57665 - Application #: 0551/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 22, 2017
318
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Islington Avenue from north of Leduc Drive to south of Golfdown Drive, Rexdale Boulevard,
in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as
located on property owned by the City of Toronto. The purpose is to install conduit and a vault.
No in -water work is within the scope of this project.
CFN: 57668 - Application #: 0606/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 2, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Dundurn Road and Strathgowan Avenue, near Mount Pleasant Road and Lawrence
Avenue East, in the City of Toronto (North York Community Council Area), Don River
Watershed, as located on property owned by the City of Toronto. The purpose is to undertake
telephone service upgrades. Works will involve removal and replacement of the existing
telephone conduits. No in -water works are within the scope of this project.
CFN: 56362 - Application #: 0799/16TTOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: June 9, 2017
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Brookbanks Drive, Hockley Place and York Mills Road, in the City of Toronto (North
York Community Council Area), Don River Watershed, as located on property owned by the City
of Toronto. The purpose is to replace Bell pedestals and to install new ducts. No in -water works
are within the scope of this project.
CFN: 56512 - Application #: 0913/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 26, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Meadowvale Road, Lawson Road, Satchell Boulevard and Acheson Boulevard, near
Kingston Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed as located on property owned by the City of Toronto. The purpose is to install
conduit and grade level boxes. No in -water work is within the scope of this project.
319
CFN: 56908 - Application #: 0524/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 2, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Piperbrook Crescent and Deekshill Drive, near Morningside Avenue and Lawrence Avenue
East, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed
as located on property owned by the City of Toronto. The purpose is to install conduit. No in -
water work is within the scope of this project.
CFN: 57661 - Application #: 0523/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 1, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Bathgate Drive and Lawrence Avenue East, near Centennial Road, in the City of Toronto
(Scarborough Community Council Area), Highland Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install conduit. No in -water work is within the
scope of this project.
CFN: 57663 - Application #: 0521/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 1, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Lawrence Avenue East from Beechgrove Drive to east of Meadowvale Road, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on
property owned by the City of Toronto. The purpose is to install conduit, grade level boxes and
manholes. No in -water work is within the scope of this project.
CFN: 57039 - Application #: 1278/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 22, 2017
320
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake structure maintenance on an existing pumping station at 240 Mount Pleasant
Road, in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed as located on property owned by the City of Toronto. The purpose is to undertake
rehabilitations to an existing pumping station. No in -water work is within the scope of this
project.
CFN: 57155 - Application #: 0070/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 9, 2017
CITY OF TORONTO
To undertake structure maintenance on the Bloor Street East bridge over Rosedale Valley
Road, in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed as located on property owned by the City of Toronto. The purpose is to undertake
bridge repairs. No in -water work is within the scope of this project.
CFN: 57156 - Application #: 0068/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 9, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake a borehole investigation within the Keele Street road allowance, south of
Lavender Road, in the City of Toronto (Toronto and East York Community Council Area),
Humber River Watershed as located on property owned by the City of Toronto - under a
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to conduct a 6 to 8 inch
wide pipeline depth exploratory dig. No in -water works are associated with this project.
CFN: 57860 - Application #: 0607/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 22, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake borehole investigations - south of Eastern Avenue and west of the Don River, in
the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as
located on the properties owned by Metrolinx - Infrastructure Ontario - and the City of Toronto -
from whom Enbridge Gas Distribution Inc. is obtaining work and access permits. The purpose
is to perform 8 borehole investigations. No in -water works are associated with this project.
CFN: 57933 - Application #: 0633/171TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 22, 2017
321
CITY OF VAUGHAN
2193914 CANADA LIMITED
To undertake sewer, watermain or utility installation or maintenance within an easement near
11300 Kipling Avenue, in the City of Vaughan, Humber River Watershed as located on the
property owned by 2193914 Canada Limited, a subsidiary of Enbridge Gas Distribution Inc. A
portion of the work site and staging area is on subdivision lands owned by Monarch Castlepoint
Kipling North Development Limited, from whom 2193914 Canada Limited is obtaining
permission to use. The purpose is to perform an integrity dig and repair an existing gas
pipeline. No in -water works are associated with this project.
CFN: 57932 - Application #: 0634/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 30, 2017
ALECTRA UTILITIES CORPORATION
To undertake utility pole replacement on Pine Valley Drive from Teston Road to Major
Mackenzie Drive West, in the City of Vaughan, Humber River Watershed as located on the
property owned by the City of Vaughan. The purpose is to replace existing hydro poles within
the road -right-of-way on Pine Valley Drive, from Major Mackenzie Drive West to Teston Road in
the City of Vaughan, Humber River Watershed. The Ministry of Natural Resources and Forestry
(MNRF) Redside Dace Timing Window will apply to these works unless otherwise specified in
writing by MNRF.
CFN: 56044 - Application #: 0296/171VAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 29, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within a future roadway
on McMichael Avenue, near First Nations Trail, in the City of Vaughan, Rouge River Watershed
as located on the property owned by the City of Vaughan, under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a 2" gas pipeline crossing above a
watercourse. The Redside Dace fisheries timing window applies to this project, unless otherwise
stated in writing by the Ministry of Natural Resources and Forestry.
CFN: 57042 - Application #: 0526/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 5, 2017
322
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the future roadways
of Pierre Berton Boulevard, Grace Lake Court, Saint Anne Way, and Meadow Green Court,
located west of Kipling Avenue and north of Teston Road, in the City of Vaughan, Humber River
Watershed as located on the property owned by the City of Vaughan, under a franchise
agreement with Enbridge Gas Distribution Inc. The purpose is to install a 4" gas pipeline within
the roadways of future residential streets. No in -water works are associated with this project.
CFN: 57564 - Application #: 0473/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 1, 2017
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on west side of Keele Street, 270 metres
north of Langstaff Road, in the City of Vaughan, Humber River Watershed as located on the
property owned by Regional Municipality of York. The purpose is to undertake regular roadside
maintenance works including ditching on the west side of Keele Street, 270 metres north of
Langstaff Road, in the City of Vaughan, Humber River Watershed, on property owned by the
Regional Municipality of York. The Ministry of Natural Resources and Forestry (MNRF) Redside
Dace timing window will apply to the proposal, unless otherwise specified in writing by MNRF.
CFN: 57532 - Application #: 0324/17NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 15, 2017
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance works including ditching and driveway
culvert replacement at the west ditch of 11800 Keele Street, north and south ditch of Major
Mackenzie Drive West, 20 metres east of Highway 50, the east and west ditch of Highway 27,
30 metres north of Steeles Avenue and the east ditch of Highway 27, from 10165 Highway 27 to
10151 Highway 27, in the City of Vaughan, Humber River Watershed as located on the property
owned by Regional Municipality of York. The purpose is to undertake drainage structure
general maintenance works including ditching and driveway culvert replacements at the west
ditch of 11800 Keele Street, north and south ditch of Major Mackenzie Drive West, 20 metres
east of Highway 50; the east and west ditch of Highway 27, 30 metres north of Steeles Avenue;
and the east ditch of Highway 27, from 10165 Highway 27 to 10151 Highway 27, in the City of
Vaughan, Humber River Watershed, on property owned by the Regional Municipality of York.
The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window will apply
to the proposal for ditching on the north and south ditch of Major Mackenzie Drive West, 20
metres east of Highway 50; and the east and west ditch of Highway 27, 30 metres north of
Steeles, unless otherwise specified in writing by MNRF.
CFN: 57533 - Application #: 0325117NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 16, 2017
323
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on the east side of Weston Road, south
of Rutherford Road, and on Langstaff Road, between Keele Street and Dufferin Street in the
City of Vaughan, Humber River Watershed, on property owned by the Regional Municipality of
York. The purpose is to undertake regular roadside maintenance works including ditching on
the east side of Weston Road, south of Rutherford Road, and on Langstaff Road, between
Keele Street and Dufferin Street in the City of Vaughan, Humber River Watershed, on property
owned by the Regional Municipality of York. The warm water construction timing window will
apply to this proposal.
CFN: 57534 - Application #: 0326/17NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 15, 2017
PICKERING CITY OF
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Bayly Street, east of Krosno Boulevard, in the City of Pickering, Frenchman's Bay Watershed as
located on property owned by the Regional Municipality of Durham. The purpose is to install
two 100 mm diameter conduits on Bayly Street, east of Krosno Boulevard, in the City of
Pickering. The warm water construction timing window will apply to this project.
CFN: 57484 - Application #: 0277/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: June 1, 2017
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
near 346 Taunton Road West, approximately 170 metres west of Ravencroft Road, in the Town
of Ajax, Duffins Creek Watershed as located on the property owned by a private landowner, to
whom Enbridge Gas Distribution Inc. is providing service. The purpose is to install a NPS 1 PE
IPgas service main. No in -water works are associated with this project.
CFN: 57825 - Application #: 0530/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 5, 2017
324
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within a future roadway
on Harrisview Street, located north of Rossland Road and west of Church Street, in the Town of
Ajax, Duffins Creek Watershed as located on the property owned by the Town of Ajax, under a
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE
IP gas pipeline crossing above a watercourse. The Redside Dace fisheries timing window
applies to this project, unless otherwise stated in writing by the Ministry of Natural Resources
and Forestry.
CFN: 57827 - Application #: 0528/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 9, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Bayly Street West, west of Westney Road, in the Town of Ajax, Duffins Creek Watershed as
located on property owned by the Regional Municipality of Durham. The purpose is to install
two 100 mm diameter conduits on Bayly Street West, west of Westney Road, in the Town of
Ajax. The warm water construction timing window will apply to this project.
CFN: 56491 - Application #: 0917/16/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: June 1, 2017
TOWN OF RICHMOND HILL
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on the east side of Yonge Street from Levendale Road to Leonard Street, near Elgin
Mills Road, in the Town of Richmond Hill, Rouge River Watershed as located on the property
owned by Regional Municipality of York. The purpose is to undertake installation of Bell ducts
within the road right-of-way along east side of the Yonge Street from Levendale Road to
Leonard Street. The works are required to accommodate the road widening of Yonge Street and
is associated with the VIVA Bus Raid Transit (BRT) project.
CFN: 57577 - Application #: 0498/171RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: June 1, 2017
325
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within a future roadway,
located north of Limerick Street, in the Town of Richmond Hill, Humber River Watershed as
located on the property owned by the Town of Richmond Hill - under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 1 1/4" gas pipeline. No in -water
works are associated with this project.
CFN: 56066 - Application #: 0720/16/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 22, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
near 11720 Bayview Avenue, in the Town of Richmond Hill, Rouge River Watershed as located
on the property owned by the Regional Municipality of York, under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to relocate an existing 1" gas pipe. No in -water
works are associated with this project.
CFN: 57858 - Application #: 0611/171RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 2, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within the future road
allowances of John Birchall Road and Bawden Drive, in the Town of Richmond Hill, Rouge
River Watershed as located on the property owned by the Town of Richmond Hill -, under
franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install 4" and 6" gas
pipelines, and a gas district station within future roadways. No in -water works are associated
with this project.
CFN: 57940 - Application #: 0691/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 29, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within a future roadway on
John Birchall Road, east of Leslie Street, in the Town of Richmond Hill, Rouge River Watershed
as located on property owned by the Town of Richmond Hill - under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a 4" gas pipeline within a future
roadway. No in -water works are associated with this project.
CFN: 57941 - Application #: 0690/171RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: June 22, 2017
326
NIAGARA INDUSTRIAL FUND LP AND URBACON PROPERTIES LIMITED
To undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Major Mackenzie Drive, from Leslie Street to Via Renzo Drive, in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by the Regional Municipality of York
with permission to enter received by Niagara Industrial Fund LP and Urbacon Properties
Limited. The purpose is to undertake extension of the existing 300mm watermain along the
north right-of-way of Major Mackenzie Drive, from Leslie Street to Via Renzo Drive, in the Town
of Richmond Hill. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing
window will apply to this proposal, unless otherwise specified in writing by MNRF.
CFN: 55270 - Application #: 0375/161RH
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: June 29, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake structure maintenance, undertake sewer and watermain or utility installation or
maintenance within an existing road right-of-way along Yonge Street near Brookside Road, in
the Town of Richmond Hill, Rouge River Watershed as located on the property owned by
Regional Municipality of York. The purpose is to undertake installation of Rogers ducts within
the road right-of-way along Yonge Street near Brookside Road. Installation will be done by
trenchless technology. The works are required to accommodate the road widening of Yonge
Street and is associated with the VIVA Bus Rapid Transit (BRT) project.
CFN: 56836 - Application #: 0350/17/RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: June 1, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing road
right-of-way on Yonge Street near Gamble Road, in the Town of Richmond Hill, Rouge River
Watershed as located on the property owned by Regional Municipality of York. The purpose is
to undertake installation of Rogers ducts within the road right-of-way along Yonge Street near
Gamble Road. The works are required to accommodate the road widening of Yonge Street and
is associated with the VIVA Bus Rapid Transit (BRT) project.
CFN: 57550 - Application #: 0422/17/RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: June 1, 2017
327
TOWN OF WHITCHURCH-STOUFFVILLE
REGIONAL MUNICIPALITY OF YORK
To undertake road resurfacing on 13461 Highway 48, near Bloomington Sideroad and Highway
48, in the Town of Whitchurch-StouffviIle, Rouge River Watershed as located on the property
owned by Regional Municipality of York. The purpose is to reconstruct and pave an existing
gravel access road, add granular material on the existing shoulder, and where necessary,
remove debris from the existing ditch on 13461 Highway 48, in the Town of Whitchurch
Stouffville, Rouge River Watershed, on property owned by the Regional Municipality of York.
CFN: 56838 - Application #: 0337/17/WS
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 9, 2017
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance at the east ditch of 12041 Woodbine
Avenue; the north ditch at Stouffville Road, 75 metres east of Woodbine Avenue; the east ditch
at Kennedy Road, north of Bethesda Road; the west ditch and culvert at 13382 Kennedy Road;
the west ditch and culvert at 12806 Kennedy Road; the east ditch at Ninth Line, 1350 metres to
1650 metres north of Main Street, in the Town of Whitchurch-Stouffville; the east ditch at 11056
to 11123 Kennedy Road, north of Elgin Mills Road in the City of Markham; the west ditch at
Leslie Street, 1190 metres to 1640 metres south of Stouffville Road in the Town of Richmond
Hill, Rouge River Watershed; the southwest corner ditch of York -Durham Line and Bethesda;
the south and west ditch at York -Durham Line and Main Street; the west ditch at York -Durham
Line and Main Street in the Town of Wh itch u rch-Stouffville; the east ditch and four culverts on
the east side of York -Durham Line and Elgin Mills Road, in the City of Markham; the east ditch
and six east side culverts at 3855 York -Durham Line, in the City of Markham, Duffins Creek
Watershed; the west ditch at York -Durham Line, 970 metres to 1300 metres south of Highway
407; the west and east ditch at York -Durham Line, 10 metres to 420 metres south of 14th
Avenue, north of Steeles Avenue, in the City of Markham, Petticoat Creek Watershed, on
property owned by the Regional Municipality of York. The purpose is to undertake regular
roadside maintenance works including ditching and driveway culvert replacement at: the east
ditch of 12041 Woodbine Avenue; the north ditch at Stouffville Road, 75 metres east of
Woodbine Avenue; the east ditch at Kennedy Road, north of Bethesda Road; the west ditch and
culvert at 13382 Kennedy Road; the west ditch and culvert at 12806 Kennedy Road; the east
ditch at Ninth Line, 1350 metres to 1650 metres north of Main Street, in the Town of
Whitchurch-Stouffville; the east ditch at 11056 to 11123 Kennedy Road, north of Elgin Mills
Road in the City of Markham; the west ditch at Leslie Street, 1190 metres to 1640 metres south
of Stouffville Road in the Town of Richmond Hill, Rouge River Watershed; the southwest corner
ditch of York -Durham Line and Bethesda; the south and west ditch at York -Durham Line and
Main Street; the west ditch at York -Durham Line and Main Street in the Town of Whitchurch-
Stouffville; the east ditch and four culverts on the east side of York -Durham Line and Elgin Mills
Road, in the City of Markham; the east ditch and six east side culverts at 3855 York -Durham
Line, in the City of Markham, Duffins Creek Watershed; the west ditch at York -Durham Line,
970 metres to 1300 metres south of Highway 407; the west and east ditch at York -Durham Line,
10 metres to 420 metres south of 14th Avenue, north of Steeles Avenue, in the City of
Markham, Petticoat Creek Watershed, on property owned by the Regional Municipality of York.
The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window applies,
unless otherwise specified in writing by MNRF.
328
CFN: 57536 - Application #: 0328/17/WS
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 16, 2017
TOWNSHIP OF KING
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on the west side of Highway 27 from
14830 Highway 27 to 14900 Highway 27, north of Bells Lake Road, in the Township of King,
Humber River Watershed as located on the property owned by Regional Municipality of York.
The purpose is to undertake regular roadside maintenance works including ditching and
driveway culvert replacement on the west side of Highway 27, from 14830 Highway 27 to 14900
Highway 27, in the Township of King, Humber River Watershed, on property owned by the
Regional Municipality of York.
CFN: 57531 - Application #: 0323/17/KING
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: June 16, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
24 BRIDGEND CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 33, Plan, 24 Bridgend Crescent, in the City of
Brampton, Humber River Watershed.
CFN: 58002 - Application #: 0647/17/13RAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: June 23, 2017
51 RAINBROOK CLOSE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 137, Plan
43M1821, Block 56, Plan 1793, 51 Rainbrook Close, in the City of Brampton, Humber River
Watershed.
329
CFN: 58068 - Application #: 0706/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: June 21, 2017
48 MOUNT FOREST DRIVE
To install a swimming pool on Lot 138, Plan M-104, 48 Mount Forest Drive, in the City of
Brampton, Etobicoke Creek Watershed.
CFN: 58066 - Application #: 0701/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: June 22, 2017
48 SUTTER AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 108, Plan M
108, 43R-5094, 48 Sutter Avenue, in the City of Brampton, Etobicoke Creek Watershed.
CFN: 58003 - Application #: 0646/17/13RAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: June 21, 2017
CITY OF MARKHAM
21 BUCKS GREEN ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 51, Plan M-
1442, (21 Bucks Green Road), in the City of Markham, Don River Watershed.
CFN: 57879 - Application #: 0589/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 20, 2017
4 OAKCREST AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 10, Concession 6 Plan 65M-
2517, (4 Oakcrest Avenue), in the City of Markham, Rouge River Watershed.
CFN: 58024 - Application #: 0660/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: June 7, 2017
330
5662 19TH AVENUE
To install a swimming pool on Part Lot 31, Concession 7, (5662 19th Avenue), in the City of
Markham, Rouge River Watershed.
CFN: 58040 - Application #: 0687/171MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 23, 2017
CITY OF PICKERING
1949 LYDIA CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 20, Plan 40M-1607, (1949
Lydia Crescent), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 57999 - Application #: 0650/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n. ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 6, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
82 FORTY FIRST STREET
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition up
to 50 sq. m (538 sq. ft) on South Part Lot 299, Plan 2172, (82 Forty First Street), in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 57729 - Application #: 0435/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 22, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
53 GLENTWORTH ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 63, Plan M-
956, (53 Glentworth Road), in the City of Toronto (North York Community Council Area), Don
River Watershed.
CFN: 58077 - Application #: 0712/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 26, 2017
331
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
7 RELMAR GARDENS INC.
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Part
Lot 7, 8, Plan M-408, (7 Relmar Gardens), in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on the property owned by 7 Relmar
Gardens Inc..
CFN: 58029 - Application #: 0683/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 14, 2017
23 CONNAUGHT AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a
ground floor addition up to 50 sq. m (538 sq. ft) on Lot 18, 19, Plan 426E, (23 Connaught
Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed.
CFN: 58120 - Application #: 0727/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 27, 2017
29 RUSHBROOKE AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Lot 119, 120, Plan M445 LT, (29
Rushbrooke Avenue), in the City of Toronto (Toronto and East York Community Council Area),
Don River Watershed.
CFN: 57990 - Application #: 0696/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 27, 2017
CITY OF VAUGHAN
60 SUNVIEW DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part 1, Lot 18
Plan 65M - 3348, (60 Sunview Drive), in the City of Vaughan, Don River Watershed.
CFN: 57869 - Application #: 0543/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Polina Barn, extension 5256, email polina.bam@trca.on.ca
Date: June 29, 2017
332
142 FARRELL ROAD
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 94, 95, ,
Plan 65M-4425, (142 Farrell Road), in the City of Vaughan, Humber River Watershed.
CFN: 58065 - Application #: 0702/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: June 20, 2017
16 SALAMANDER COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 228, Plan
65M-3878, (16 Salamander Court), in the City of Vaughan, Don River Watershed.
CFN: 58034 - Application #: 0665/171VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: June 29, 2017
137 LADY NADIA DRIVE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 23, Plan
65M-4223, (137 Lady Nadia Drive), in the City of Vaughan, Don River Watershed.
CFN: 57921 - Application #: 0632/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: May 31, 2017
106 NER ISRAEL DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 23, Plan 65M-3808, (106 Ner Israel Drive), in the City
of Vaughan, Don River Watershed.
CFN: 58106 - Application #: 0733/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: June 28, 2017
TOWN OF AJAX
21 TEMPLE -WEST CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 17, Plan
40M-2053, (21 Temple -West Crescent), in the Town of Ajax, Duffins Creek Watershed.
333
CFN: 58067 - Application #: 0698/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 19, 2017
51 MUSCAT CRESCENT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 32, Plan
40M-2305, (51 Muscat Crescent), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 57894 - Application #: 0594/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: May 31, 2017
39 WESTACOTT CRESCENT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 17, Plan
40M-2043, (39 Westacott Crescent), in the Town of Ajax, Duffins Creek Watershed.
CFN: 57893 - Application #: 0593/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 2, 2017
17 REEVESMERE LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (17
Reevesmere Lane), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 58027 - Application #: 0672/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 26, 2017
TOWN OF CALEDON
14596 CALEDON KING TOWNLINE SOUTH
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 13, Concession 9, (14596 Caledon King Townline South), in the Town of
Caledon, Humber River Watershed.
334
CFN: 57589 - Application #: 0341/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: June 6, 2017
TOWN OF RICHMOND HILL
33 HORNER COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 198,
Concession 2683 Lot 198, Plan 65M, (33 Horner Court), in the Town of Richmond Hill, Rouge
River Watershed.
CFN: 57883 - Application #: 0591/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 1, 2017
21 CIVIDALE COURT
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 84, Plan 65R-35857, (21 Cividale Court), in the Town of Richmond Hill, Don
River Watershed.
CFN: 58008 - Application #: 0675/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 14, 2017
26 WINDMILL COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 41, 42, 44,
Plan RP 12003, (26 Windmill Court), in the Town of Richmond Hill, Rouge River Watershed.
CFN: 58028 - Application #: 0671/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 14, 2017
67 ALPACA DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 153, Plan
65M-3896, (67 Alpaca Drive), in the Town of Richmond Hill, Rouge River Watershed.
CFN: 57884 - Application #: 0592/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: June 1, 2017
335
TOWN OF WHITCHURCH-STOUFFVILLE
HILL TOP TRAIL
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 12, Plan
65M-2412, (3 Hill Top Trail), in the Town of Whitch urch-StouffviIle, Duffins Creek Watershed.
CFN: 58035 - Application #: 0664/171WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 19, 2017
TOWNSHIP OF KING
3185 16th Sideroad
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 5, Concession 5, (3185 16th Sideroad), in the Township of King, Humber
River Watershed.
CFN: 58009 - Application #: 0651/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 7, 2017
57 HOGAN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 105, Plan
65M-4342, (57 Hogan Court), in the Township of King, Humber River Watershed.
CFN: 58000 - Application #: 0649/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 5, 2017
CITY OF MARKHAM
10.10 EP VICTORIA SQUARE LTD.
To change a building or structure so that it alters its use or potential use, increases its
size or increases the number of dwelling units, site grade, temporarily or permanently
place, dump or remove any material, originating on the site or elsewhere and interfere
with a wetland on Part Lot 27, Concession 4 , Part Lot 27, Concession 4, (10925, 10945
and 10978 Woodbine Avenue, 404 North Secondary Plan), in the City of Markham,
Rouge River Watershed as located on the property owned by EP Victoria Square Ltd..
The purpose is to undertake site alteration and grading and the removal of a including
the removal of two small, isolated wetland pockets in support of an approved draft plan
of subdivision (19TM-13002 and 19TM-14008).
CFN: 54462 - Application #: 0777/15/MARK
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: July 10, 2017
336
CITY OF PICKERING
10.11 1760 FINCH AVENUE
To construct, reconstruct, erect or place a building or structure and site grade on Part
Lot 18, Concession 2, (1760 Finch Avenue), in the City of Pickering, Duffins Creek
Watershed. The purpose is to recognize the reconstruction of a shed (40.9 mz) and a
wooden deck to the side of the existing detached garage on the residential property
located at 1760 Finch Avenue in the City of Pickering.
CFN: 55856 - Application #: 0439/16/PICK
Report Prepared by: Vanessa Aubrey 5662 vaubrey@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: July 11, 2017
CITY OF VAUGHAN
10.12 NASHVILLE DEVELOPMENTS (NORTH) INC.
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
interfere with a wetland and alter a watercourse on Lot 24, Concession 9, (10533
Huntington Road), in the City of Vaughan, Humber River Watershed as located on the
property owned by Nashville Developments (North) Inc. The purpose is to allow
development, interference with a wetland and alteration of a watercourse within a
Regulated Area of the Humber River Watershed to facilitate the removal of two on-line
ponds, the creation of approximately 257 metres of natural channel, and the construction
of a culvert, watermain and sanitary sewer crossing of Tributary 'A' at Mactier Drive to
service multiple draft plans of subdivision (19T -10V004, 19T -15V006 and 19T -16V010)
within Block 61 West, southeast of Nashville Road and Huntington Road, in the City of
Vaughan.
CFN: 58022 - Application #: 0668/17NAUG
For information contact: Brian Denney 6290 bdenney@trca.on.ca
Date: July 10, 2017
CITY OF VAUGHAN
10.13 REGIONAL MUNICIPALITY OF YORK
To construct, reconstruct, erect or place a building or structure, temporarily or
permanently place, dump or remove any material originating on the site or elsewhere,
alter a watercourse on Highway 7, approximately 0.3 km west of Pine Valley Drive, in the
City of Vaughan, Humber River Watershed as located on the property owned by
Regional Municipality of York and within permanent and Temporary Limited Interest
(TLI) easements. The purpose is to undertake extension of a culvert (Culvert C1) located
on Highway 7, west of Pine Valley Drive and east of Islington Avenue. The proposed
works will include culvert extensions to the north and south ends, stream realignment
and channel modifications, replacement of drainage structures and stream bank
restoration to accommodate the widening of the roadway. The works are required to
accommodate the road widening of Highway 7 and is associated with the VIVA Bus
Rapid Transit (BRT) project. The Ministry of Natural Resources and Forestry (MNRF)
warmwater fisheries timing window will be applied to this project unless otherwise
specified in writing by MNRF.
337
CFN: 56528 - Application #: 1036/161VAUG
Report Prepared by: Harsha Gammanpila 5629 hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila 5629 hgammanpila@trca.on.ca
Date: July 12, 2017
TOWN OF CALEDON
10.14 BROOKFIELD HOMES (ONTARIO) LIMITED
To site grade on, (50 Ann Street), in the Town of Caledon, Humber River Watershed as
located on the property owned by Brookfield Homes (Ontario) Limited. The purpose is to
site grade, excavate soils and construct shoring structures to remediate an infill lot prior
to development within the Humber River watershed, which is associated with a municipal
site plan application.
CFN: 56117 - Application #: 0676/161CAL
Report Prepared by: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
For information contact: Quentin Hanchard 5324 ghanchard@trca.on.ca
Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
Date: July 11, 2017
TERMINATION
ON MOTION, the meeting terminated at 9:40 a.m., on Friday, July 14, 2017.
Maria Augimeri
Chair
/ks
338
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #6/17 was held at TRCA Head Office, on Friday, August 11,
2017. The Chair Maria Augimeri, called the meeting to order at 9:28 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Chris Fonseca
Member
Jennifer Innis
Member
Mike Mattos
Member
Jennifer McKelvie
Member
Anthony Perruzza
Member
ABSENT
Brenda Hogg Member
Colleen Jordan Member
RES.#B66/17 - MINUTES
Moved by: Jennifer McKelvie
Seconded by: Jennifer Innis
THAT the Minutes of Meeting #5/17, held on July 14, 2017, be approved.
CARRIED
DELEGATIONS
4.1 A delegation by Melissa Preston and Laura Alderson in regard to item 8.1 - Request for
Disposal of Toronto and Region Conservation Authority -owned Land.
RES.#B67/17 - DELEGATIONS
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THAT the above -noted delegation 4.1 be received.
CARRIED
339
Section II — Items for Executive Action
RES.#B68/17 - REQUEST FOR DISPOSAL OF TORONTO AND REGION
CONSERVATION AUTHORITY -OWNED LAND
14 Pickering/Scarborough Townline — City of Toronto, Rouge River
Watershed, CFN 33517. Receipt of a request from Melissa Preston and
Laura Alderson, Co -Executors of Joyce Scott's Estate, (former tenant of
TRCA) to consider the sale of a portion of Toronto and Region
Conservation Authority -owned property located at 14
Pickering/Scarborough Townline, City of Toronto, Rouge River watershed.
Moved by: Jack Heath
Seconded by: Glenn De Baeremaeker
THAT the potential disposal of a portion of Toronto and Region Conservation Authority
(TRCA) owned property located at 14 Pickering/Scarborough Townline, City of Toronto, be
referred to TRCA staff for review and discussion in accordance with established TRCA
policies;
AND FURTHER THAT a report be brought forward to the Executive Committee at a future
date recommending further action.
CARRIED
BACKGROUND
This request is being brought to the attention of the Executive Committee in accordance with
resolution #26, adopted by TRCA at Authority Meeting #1/91, held on February 22, 1991.
Correspondence has been received from Melissa Preston and Laura Alderson requesting to
purchase a fragment of TRCA-owned property located at 14 Pickering/Scarborough Townline, in
the City of Toronto. A copy of the letter is included as Attachment 1.
The subject TRCA-owned lands were transferred to TRCA by the Ontario Realty Corporation
(ORC) in 2004 as part of the landholdings transferred for Rouge Park purposes. At the time of
transfer the Province of Ontario retained an Option to Purchase/First Right of Refusal over all the
lands transferred including the subject property. All leases that were in place at the time of the
transfer were assumed by TRCA. The lease with the late Joyce Scott for 14
Pickering/Scarborough Townline was one of these leases.
The subject TRCA-owned land is improved with a single family dwelling. It was reportedly built in
1835 with an addition constructed in 1958. The subject property is being well maintained and is
in average to good condition. The interior finishes are dated and require upgrading. There are
some exterior repairs required to the windows and stone work.
On May 25, 2012, the federal government announced the proposed Rouge National Urban Park.
The subject TRCA-owned property falls within the boundaries of the Park, and is included in the
Memorandum of Agreement Respecting the Assembly of Lands for the Proposed Rouge National
Urban Park. It is anticipated the transfer will occur later this year or early next year.
340
In accordance with TRCA policy, this request for disposal will be circulate to TRCA technical staff
as well as municipal staff for review and comment. Since the property is included in the Option to
Purchase/First Right of Refusal with the Province and Memorandum of Agreement with Parks
Canada, the Province and Parks Canada will also be circulated for review and comment. Staff will
report to the Executive Committee on the comments received and make a recommendation to
either retain the property or declare it surplus. The proponent will be advised of the results of the
staff review at the time a report is prepared for the Executive Committee. The proponent will have
the opportunity to make a delegation at the Executive Committee meeting when the matter is
considered.
A sketch illustrating the subject lands is attached as Attachment 2.
Report prepared by: Lori Colussi, extension 5303
Emai Is: Icolussi(Dtrca.on.ca
For Information contact: Lori Colussi, extension 5303, Mike Fenning, extension 5223
Emails: Icolussi(aatrca.on.ca, mfenning(cZ)trca.on.ca
Date: July 21, 2017
Attachments: 2
341
Attachment 1
July 4, 2017
Ms. Maria Augimeri, Chair
Toronto and Region Conservation Authority
5 Shoreham Drive
Downsview, ON
M3N 1S4
Dear Ms. Augimeri;
RE: Request to Repurchase 14 Pickering Townline in the Rouge Park,
Scarborough, Ontario
As the Co -Executors of our dear late mother's estate (Joyce Anna Scott), we are writing
to you as the Chair of the Toronto and Region Conservation Authority (TRCA) on behalf
of our immediate family. In an attempt to restore equity, fairness and finally make right
the past, we would like to have our family home at 14 Pickering Town Line returned to
us, as is consistent with the provincial government's promise to our parents.
Our late father ( John Scott) purchased the land in April of 1958 (instrument no.
217540). In addition to a matrimonial interest, our mother was a mortgagee. 15 years
later, In February of 1973, our 10 acre family farm was expropriated by the Ministry of
Housing to make way for the Pickering Airport and the North Pickering Community
development project that would surround it, an ill-advised project that would never
happen.
In a pamphlet from the Ontario Government dropped in our mailbox were the terms
under which the acquisition of our home by the provincial government would take place.
It contained the following question/answer posed by the government on the last panel.
"What if the government finds it doesn't need my house after all? If such a
decision is made — and this will occur, unquestionably in some instances, you
will be offered the chance to recover ownership at the same price you were paid
initially. In other words, you will have had the use of house and property rent-free
through the time the government owned it." (attach. "A")
In that same month, the Honourable Claude F. Bennett wrote to our parents concerning
our impending expropriation and although they were shaken, our parents were again
somewhat reassured by what the Minister had to say in writing.
"...wherever present residential uses are compatible with the plan for
redevelopment which is scheduled for completion by the end of 1974, the owners
will have an opportunity to repurchase them at the price originally paid for them
by the province." (attach. "B")
342
More than a year later, in September of 1974, they received correspondence from G.M.
Kaye, Acquisition Agent for the Ministry of Housing. The letter quotes a statement by
the Honourable Sidney Handleman, then Minister of Housing, to the effect that
occupancy of the expropriated lands until June 1975, would be possible by entering into
a licensing agreement with the province. According to the letter, the licensing
agreement would assure rent-free possession of properties until that date and
would guarantee the right to buy back the residential portion of the properties at
prices based upon that paid by the province, if they are compatible with the plan for
North Pickering. (attach. "C")
Without notification to the previous owners, our parents, and contrary to Section 42 of
the Expropriations Act, the Ministry of Housing transferred the land to the Ontario Land
Corporation in October of 1979 without giving us the opportunity to repurchase the land.
More than a decade later on March 22"d, 1989 and long after plans for the Pickering
Airport had been scrapped, our parents wrote to the Ministry of Government Services
and expressed their sincere interest in buying back our heritage home since 1958,
where they had raised their family. Incredulously, and fully sixteen years after their
expropriation for a project that never happened, a reply was sent on April 6'h, 1989 from
the Ministry advising that while our parents had expressed interest in purchasing the
property, they had not yet declared it surplus!
"7n the event that the expropriated lands are declared surplus, you will be
notified." (attach. "D")
In spite of the contents of that letter, our parents were reassured by what we had been
told in writing by the Ontario government and accepted in good faith that should our
family farm not be used for the sole purpose of the expropriation , we would have the
opportunity to repurchase our family farm that had been our home since 1958.
Subsequently, without offering us the first right of refusal to repurchase our family farm,
the Ontario Land Corporation sold our land to the Toronto and Region Conservation
Authority in 2004, thereby breaking the government's promise to advise us when the
lands would be declared surplus.
Although the TRCA has declared our property to be park land (part of the Rouge Park)
and therefore part of the Greenbelt, the official park plan does indeed contemplate
continuing residential use, therefore the TRCA cannot dispute that the re -conveyance of
our family home IS consistent with that plan. Furthermore, as the TRCA is no doubt
aware, environmental stewardship of the lands is enhanced rather than destroyed by
private ownership, resulting in the reinvestment of both the lands and heritage buildings
on the property. Although our mother was a model tenant and never complained, it has
been the family's experience that repairs to the property were promised but not
completed in a timely manner. Therefore, we cannot help but wonder whether the
TRCA, has perhaps been remiss in their duties as the steward of this heritage property,
by allowing the remaining properties within the park, some of them designated heritage
such as ours, fall into such disrepair as to permit "demolition through neglect." Surely
343
this is not consistent with the Ontario Heritage Act?
Given the many promises made to our family by the Ontario Government in writing, how
is it possible that in June of 2017, fully forty-four years after we entered into what we
thought were honest, fair and equitable dealings with the provincial government, we are
still waiting to be advised whether our land will be used for the purpose of the original
expropriation and failing that, returned to us? While not acquired through deception but
with the best intentions of the government at that time, the property is nonetheless
being held "in trust?" by a seemingly less than fair current policy. How can it be
considered equitable to expropriate private land for a public project that never happens
and then charge current market value rents effectively clawing back whatever payment
or benefit may have resulted from the forced sale of the property? In our parent's case,
they have paid considerably more in rent over the years than they were originally paid
for the property! Regardless of the governing party of this or any other day, how can this
in any way be considered fair and equitable treatment of Ontarians that include
vulnerable senior citizens?
In view of the simple, but nonetheless important, fact that our parents have paid more in
rent than they were compensated for during the initial expropriation proceedings, we
are asking that the TRCA return our family farm to us at a fair price. Should the
family wish to dispose of our rightful legacy at some future date, the stipulation for such
a transfer could be that it is offered up for sale as a single family dwelling and that all 10
acres be considered as one parcel of land to protect the integrity of the home my
parents lovingly referred to as "The Seasons".
In the spirit of fairness and to restore some semblance of integrity, transparency and
accountability to the provincial government and now its agency, the TRCA, a family
representative would very much like the opportunity to make a deputation at your next
Executive Committee Meeting on Friday, July 14th.
We look forward to hearing from you
satisfactorily resolve what has been
difficult issue.
Yours truly,
at your earliest convenience in order to
for us a long outstanding and personally very
Laura Alderson, Co -Executor &
Melissa Preston, Co -Executor
cc: MPP Raymond Cho, and Stephen D'Agostino, Thomson Rogers
344
Attachment 2
Subject
Property
c <� �
Legend
® Conservation
/ar The Living City-
L�
'PO's (coat CreeK
L,
RES.#B69/17 - EASTERN AND BROADVIEW FLOOD PROTECTION DUE DILIGENCE
AND MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
Award of Contract RFP#10001976. Award of contract RFP#10001976 for
professional hydraulic modelling and flood protection design consulting
services, as part of the Eastern and Broadview Flood Protection Due
Diligence and Municipal Class Environmental Assessment (EA).
Moved by: Chris Fonseca
Seconded by: Jennifer Innis
THAT contract RFP#10001976 for professional hydraulic modelling and flood protection
design services, as part of the Eastern and Broadview Flood Protection Due Diligence and
Municipal Class EA, be awarded to AECOM at a total cost not to exceed $88,404.42 plus
50% contingency to address uncertainties associated with the number of parallel projects
currently underway, plus HST, it being the highest ranked proposal for value meeting
TRCA's specifications;
AND FURTHER THAT staff be authorized and directed to take all necessary actions to
implement the foregoing, including the signing of documents.
CARRIED
BACKGROUND
At Toronto City Council Meeting #27, held on March 28, 2017, the Planning and Growth
Management Committee Report PG18.6 was adopted, within which the Deputy City Manager,
Cluster B, was directed to commence, together with the Toronto and Region Conservation
Authority and TWRC, the Eastern and Broadview Flood Protection Municipal Class
Environmental Assessment (Recommendation 4).
At Authority Meeting #5/17, held on June 23, 2017, Resolution #A104/17 was approved, in part,
as follows:
WHEREAS the City of Toronto and TWRC have requested that TRCA lead a Due
Diligence and Class Environmental Assessment (EA) Study, which will be undertaken to
identify a flood protection solution to remove the remaining flood risk to these 8 ha of
urban land north of the elevated Metrolinx railway embankment,
THEREFORE LET /T BE RESOLVED THAT TRCA enter into a Delivery Agreement with
TWRC to undertake the Due Diligence and Class EA studies,
A Delivery Agreement between TRCA and the TWRC is currently under review between the two
co -proponents, with an approved overall budget of $1.8 million. This includes hydraulic modelling
and flood protection design consulting services in support of identifying a potential flood
protection solution for the Eastern and Broadview Class EA.
In support of the Class EA, TRCA requires a qualified hydraulic modelling and flood protection
design consultant team to review and make refinements to the TRCA's MIKE FLOOD hydraulic
model; develop a HEC -RAS model to conduct an initial screening of alternative solutions
including sensitivity analysis runs over a range of hydrological conditions; utilize the MIKE
FLOOD model to complete detailed hydraulic analysis of the refined short-list of Alternatives; and
provide design expertise related to alternative flood protection solutions under consideration. The
scope of this work will start with an initial Due Diligence phase (Stage 1) which may dovetail into
an expedited Class EA process (Stage 2) if the Port Lands Executive Steering Committee deems
that viable solutions are identified during Stage 1 (from an impact and cost perspective).
REP
TRCA will lead a Project Management Team consisting of staff from TRCA, the City and
Waterfront Toronto and the studies will be coordinated closely with the large number of initiatives
that are currently underway in the Project Area. These include, but are not limited to, the Gardiner
EA, Port Lands and South of Eastern Class EA, Metrolinx TPAPs, TTC Subway Relief Line
planning, the Detailed Design of the Don River and Central Waterfront Project, and TRCA's Don
River Watershed Hydrological Modeling review.
RATIONALE
RFP#10001976 was released via Biddingo to all potential bidders on June 19th 2017, with a total
of seven firms submitting proposals in advance of the 12:00 p.m. submission deadline on Friday
July 14th 2017 (Table 1).
Table 1. List of Consultants who submitted proposals and associated project cost estimates
Firms
Fee Proposal
AECOM
$86,671.00
AMEC
$188,968.50
KGS Group
$200,328.00
A uafor Beech
$219,860.00
Matrix Solutions Inc.
$290,506.40
Lasalle
$259,185.00
CH2M
$443,670.00
All three members on the evaluation committee, consisting of staff from TRCA and Waterfront
Toronto, received copies of the submitted proposals on July 14th, 2017. At the proposal evaluation
meeting held on July 27th, 2017, consensus was reached between all members of the committee
that the proposal submitted by AECOM offered the best service for the best value.
The criteria used to evaluate the submissions and to select the successful consultant included the
following:
Overall conformance of proposal submission package with terms of RFP;
Understanding of project scope of work;
Experience of firm working on projects of similar scope and budget;
Expertise of staff and appropriate allocation of resources;
Approach and methodology of work plan, including innovative ideas, identification of
project limitations, and proposed solutions;
Clear and well thought out schedule and timelines to achieve project objectives; and
Detailed cost breakdown, including an itemized cost of additional works anticipated
beyond the approved budget.
FINANCIAL DETAILS
The creation of a sub -project within the Waterfront Revitalization Initiatives 2017-2026 Capital
Budget and Plan has been recommended in order to cover the full cost of the Eastern and
Broadview Flood Protection Municipal Class EA. Funding will be tracked through a series of
191-70 accounts. Given the large number of planning initiatives underway in the immediate area,
and given the Don River Watershed Hydrology model review currently underway by TRCA, there
is the potential for a significant number of additional model runs that may be required than was
originally identified in the RFP. To address the uncertainty associated issues arising from the
parallel planning initiatives, staff are recommending a 50% contingency be added to the contract.
347
DETAILS OF WORK TO BE DONE
TRCA, TWRC and the City of Toronto will work as co -proponents to identify a viable flood
protection solution for the area north of the railway embankment. The project will consist of a Two
Stage process:
a) Stage 1: Due Diligence stage that will follow Phases 1 and 2 of the Municipal Class EA
process, minus the public engagement elements of the study to confirm that a viable
alternative can be established; and
b) Stage 2: Undertaking the formal Municipal Class EA process if directed to proceed by the
Executive Steering Committee (ESC) — it will be reconfirmed whether a Schedule B or C
Class EA is required at this time.
For the above-mentioned works, TRCA requires the support of several consultant teams in order
to fulfill the requirements of the EA planning and design process. Three consultant teams will lead
the implementation and management of the required services and will coordinate with each other
in order to 1) characterize the environmental, geotechnical and hydrogeological subsurface
conditions of the project area; 2) carry -out hydraulic modeling and design services of the various
flood protection solutions under consideration; and 3) provide planning and engineering support
in the development of the Due Diligence and Class EA. AECOM has been selected as the
consultant lead the Task 2 services outlined in RFP#10001976, which includes but is not limited
to the review of existing model frameworks, the development of new model simulations based on
a variety of flood protection alternatives, and assisting with refinement and integration of
alternatives with existing and future land use considerations.
Report prepared by: Corey Wells, extension 5233
Emails: cwells(aArca.on.ca
For Information contact: Ken Dion, extension 5230
Emails: kdion(dtrca.on.ca
Date: July 27, 2017
KEN
RES.#B70/17 - STEP SMART ENERGY NETWORK CONSULTING
Award of Contract. Approval to award contract #10005326 for engineering
consulting for Smart Energy Networks.
Moved by: Jack Heath
Seconded by: Jennifer McKelvie
THAT Contract #10005326 for Smart Energy Networks, Engineering Consulting be
awarded on a preferred source basis to Hero Engineering at a total cost not to exceed
$58,800, plus 15% contingency, plus HST;
AND FURTHER THAT authorized officials be directed to take the necessary action to
implement the contract including the signing and execution of documents.
CARRIED
BACKGROUND
Toronto and Region Conservation Authority (TRCA) has been participating in leading edge
research towards Smart Energy Networks (SEN), Smart Grid and Net -Zero Energy Buildings with
the common goal of reducing greenhouse gases (GHGs), introducing low carbon technologies
and distributed energy sources, and decreasing our energy dependency. This type of work is
heavily emphasized in TRCA's 10 -year strategic plan "Building The Living City" which identifies
action related to the development of "...sustainable strategies for large scale community
development and redevelopment initiatives by integrating traditional watershed planning and
municipal environmental planning concepts with other sustainability elements, such as energy
effiiciency... ... green infrastructure' (Section 4, Action 1).
Engineering consulting is needed in a variety of streams to help support the work of TRCA's
Sustainable Technologies Evaluation Program (STEP), including the development of a feasibility
study on Smart Energy Networks, which will directly influence TRCA's energy conservation and
management practices, future development of the new head office and organization -wide GHG
reductions, along with providing a model for low carbon district energy systems for municipalities.
Additionally, the consultant will be aiding STEP in developing proposals with the Independent
Electricity System Operator (IESO) and Natural Resources Canada (NRCan) for future funding
utilizing TRCA infrastructure and the consultant's connections within academic and utility
industries. Furthermore, the consultant will be aiding in developing software and infrastructure to
continue TRCA's distributed data acquisition and monitoring for external labs and projects. This
will aid STEP to provide relevant and up-to-date research projects with a variety of partners and
stakeholders that provide the necessary funding.
Hero Engineering has been involved with and led the development of a number of SEN initiatives
at The Living City Campus including the photovoltaic sensor array, data warehouse, and
networking infrastructure. As such, Hero Engineering has intimate knowledge of the existing
systems that will be used as part of planned SEN research and development going forward.
RATIONALE
Smart Energy Networks and net zero buildings are a critical part of how communities will function
in the near future. The SEN approach is a critical piece of how municipalities will adapt their
energy systems to become more resilient to climate change. Working with our municipal partners
to catalyze advances in SEN's is supported by TRCA's Building the Living City Strategic Plan.
349
The Selection Committee of TRCA staff (Leigh St. Hilaire, Amanda Yip) reviewed the proposal.
The criteria used to evaluate and select the recommended vendor were based on qualifications
and experience, quality of the proposal, approach/methodology and reasonability of cost. The
selection committee found that the consultant is competitively priced, and reflects the cost
savings realized by utilizing a consultant who is already familiar with the study area, requiring less
hours to complete the assignment.
Staff recommends that Contract #10002159 be awarded to Hero Engineering on a preferred
source basis for a total cost not to exceed $58,800.00, plus a 15% contingency, plus HST. The
vendor has specialized knowledge on these subjects and projects as well as detailed knowledge
and expertise of TRCA's energy generation infrastructure, hardware and programming needs.
The vendor was also a co -applicant on the LDC Tomorrow Fund project that is covered under this
contract. Furthermore, the vendor has a detailed understanding and communication with key
proponents and stakeholders of the project: York University, Ryerson University, and Sumaran
Inc and is uniquely qualified to deliver the services requested to TRCA.
Approval to hire Hero Engineering on a preferred source basis is in compliance with TRCA's
Purchasing Policy requirements under Section 9.3(3) which states:
The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably
provided by any other supplier.
FINANCIAL DETAILS
41460 - general capital ($15,000) from our municipal partners
41692 - general funds, external contracts; Sumaran, Ryerson ($27,620)
41550 - LDC Tomorrow Fund ($25,000)
Report prepared by: Gil Amdurski, 416-888-8321
Emails: ciamdurski0trca.on.ca
For Information contact: Gil Amdurski, 416-888-8321
Emails: ciamdurskiMrca.on.ca
Date: July 27, 2017
350
RES.#B71/17 - ONTARIO MUNICIPAL BOARD REFORM (BILL 139)
Draft Toronto and Region Conservation Authority (TRCA) Comments.
TRCA's draft response to the Province as it relates to the proposed
changes to the Planning Act and Ontario Municipal Board Act, as part of Bill
139 — the Building Better Communities and Conserving Watersheds Act,
2017 (EBR Notice #013-0590).
Moved by: Glenn De Baeremaeker
Seconded by: Anthony Perruzza
WHEREAS the Province of Ontario has posted the proposed amendments to the Planning
Act and Ontario Municipal Board Act as part of Bill 139, the Building Better Communities
and Conserving Watersheds Act for public comment on the Environmental Bill of Rights
(EBR);
AND WHEREAS Toronto and Region Conservation Authority (TRCA) has roles and
responsibilities affecting planning matters that come before the Ontario Municipal Board
(OMB), through which TRCA staff regularly participate;
THEREFORE LET IT BE RESOLVED THAT the staff report on TRCA's draft comments to
the Province through EBR posting #013-0590 be endorsed;
AND FURTHER THAT this report be circulated to TRCA's municipal partners,
neighbouring conservation authorities and Conservation Ontario for their information.
CARRIED
BACKGROUND
Since 2004, the Ontario government has implemented a series of land use planning reforms
aimed at making the provincial planning system more inclusive and transparent, including the
Strong Communities (Planning Amendment) Act, 2004, the Planning and Conservation Land
Statute Law Amendment Act, 2006, and the Smart Growth for Our Communities Act, 2015 (EBR#
012-3651). These efforts altered the procedures and operations of the OMB by placing limits on
the number of matters that can be appealed and giving municipalities a stronger, more
independent voice in local land use decisions. Despite these changes, the Province continued to
hear concerns from municipalities, stakeholders and the public about the role of the OMB in the
land use planning system.
In June 2016, the Ontario government commenced its review of the scope and effectiveness of
the OMB. In October 2016, the Province released a Consultation Document to provide the public
with an opportunity to comment on changes being considered to improve Ontario's land use
planning appeal system in response to the changing needs of its communities (EBR #012-7196).
A series of questions centering on the following five themes were proposed:
1) OMB jurisdiction and powers;
2) Citizen participation and local perspective;
3) Clear and predictable decision-making;
4) Modern procedures and faster decisions; and,
5) Alternative dispute resolution and fewer hearings.
351
On December 19, 2016, TRCA staff provided comments in response to these questions and
offered a number of recommendations staff deemed to be of particular importance from TRCA's
jurisdictional perspective and experiences at the OMB, as approved by Resolution #A231/16 at
Authority Meeting # 11/16. These key recommendations included:
Appeals based on non -decisions are often tied to applications that are deemed "complete"
yet lack the supporting information required for agencies like TRCA to make an adequate
assessment of the application;
Appeal rights should be restricted for land use matters that protect provincial interests and
prohibit development related to natural heritage, source water and natural hazards in the
Provincial Policy Statement (PPS);
Given the unique provincial ministerial approval process, appeal rights should be
restricted for official plan (OP) or OP amendments (OPAs) associated with Special Policy
Areas (SPAS) under Section 3.1.4 (a) of the PPS;
The technical criteria developed to provide guidance on provincial interests at OMB
hearings, specifically those related to the natural heritage and natural hazard policies of
the PPS, should be given more weight and status;
Updated provincial planning rules should apply at the time of decision for applications
submitted before 2007;
Clarification is needed as to what constitutes information as "significant" when new
"significant information" is introduced at an OMB hearing and sent back to council for
reconsideration;
The number of appeals should be limited, appeal timelines should be shortened, and
broad appeals should be substantiated by a sound planning rationale prior to proceeding;
When new technical work in support of an application is introduced during a hearing, the
hearing should be adjourned and the application should continue to be processed to a
decision in the municipal planning realm;
Multi -member panels are needed to increase the consistency of decision-making and
provide a more holistic and balanced perspective of the various public interests relevant
during appeals, particularly for complex cases;
Where applicable, OMB members may benefit from professional development/training on
emerging or complex issues such as environmental management and/or issues related to
the Conservation Authorities Act.
On May 30, 2017, the Province introduced Bill 139, the Building Better Communities and
Conserving Watersheds Act, 2017. Bill 139 is an "omnibus bill" that proposes a series of
transformative legislative changes that, if passed, would overhaul Ontario's land use planning
system by changing the manner in which local planning decisions are made. The changes
proposed through Bill 139 are included in the following five Schedules:
Schedule 1: Enacting the Local Planning Appeal Tribunal Act, 2017
Schedule 2: Enacting the Local Planning Appeal Support Centre Act, 2017
Schedule 3: Amendments to the Planning Act, the City of Toronto Act, and the Ontario Planning
and Development Act
Schedule 4: Amendments to the Conservation Authorities Act
Schedule 5: Amendments to various Acts consequential to their enactment
352
Bill 139 will have to pass through two more readings in the legislature before being enacted. This
could occur during the next season of legislature (commencing September 11, 2017). During this
time, it will be debated and could be referred to a Standing Committee for a "clause by clause"
review. Many of the proposed amendments are enabling only, meaning that they would not come
into force until a later date through regulations made by the Lieutenant Governor in Council
(LGIC) or the Minister. Bill 139 also proposes significant changes to the Conservation Authorities
Act (Schedule 4), however, TRCA staff have, and will continue to report on these changes
independently from those specific to the OMB reform (Schedules 1, 2, 3, and 5).
Key Legislative Changes Proposed Through Bill 139 (Related to the OMB only)
The following synopsis outlines significant changes that would result from Bill 139, as they relate
to TRCA's interests, roles and responsibilities. Additional recommendations to further these
proposed changes are outlined in the "Analysis and Key Recommendations" section of this staff
report.
Replacing the OMB with a Local Planning Appeal Tribunal ("LPAT")
The OMB would be replaced with the LPAT, a tribunal mandated to give greater weight to the
decisions of local communities, while ensuring that development and growth occur in a way that is
good for Ontario and its future.
Establishing the Local Planning Appeals Support Centre ("LPASC")
Planning appeals would be more publically accessible through the creation of the LPASC, an
agency modeled after the Human Rights Legal Support Centre. The LPASC would address
TRCA's call for enhanced support for the general public in the appeals process as it would provide
free, general legal and planning advice and representation to eligible citizens who may want to
participate in local planning appeals. The LPASC would be independent from, but still
accountable to, the Ontario government. Eligibility criteria for the LPASC would be prescribed
through a future regulation.
New Appeals Process / Elimination of de novo Hearings
An appeal of a municipally-adopted/approved OP or Zoning By-law (ZBL) amendment would now
have to describe, in writing, why a decision by Council (or failure to make a decision) fails one of
the following "conformity/consistency tests":
(i) it is inconsistent with a provincial policy statement;
(ii) it fails to conform with or conflicts with a provincial plan; and,
(iii) in the case of a lower-tier OP, it fails to conform with the OP of the applicable
upper-tier municipality.
An appeal for a refusal of a privately-initiated OP/ZBL amendment would need to explain why
existing policies/regulations of an OP/ZBL fail one of the above conformity/consistency tests,
while also demonstrating how the proposed OP or ZBL amendment would satisfy the test in its
entirety.
If the LPAT deems that an appeal does not adequately meet the requirements of the
conformity/consistency tests, or if a submission is missing any other essential information, the
LPAT must dismiss the appeal without a hearing.
353
The OMB operates with a considerable level of discretion regarding its ability to hear evidence
and overturn a municipal decision if, in the Board's opinion, Council did not make an "optimal"
planning decision based on the principles of "good planning". The Board also has the authority to
conduct hearings on a "de novo" basis, meaning that OMB decisions must have regard for
decisions by Council (and any information Council considered) but the Board can make a decision
independent from and without reference to them. Through Bill 139, this "standard of review" would
be reformed such that the LPAT could only overturn Council's decision if the LPAT deemed it to
have failed any one of the above noted conformity/consistency tests, and after Council has been
given the opportunity to make a new decision.
If the LPAT was convinced that Council's decision failed any of the conformity/consistency tests,
all or part of the decision would be returned to the municipality with justification as to why a new
decision is required. The municipality would then have 90 days to reconsider the application and
make a new decision that rectifies the deficiencies identified by the LPAT. If the LPAT receives a
second appeal and the LPAT still finds that the new municipal decision failed to meet the
conformity/consistency test, then the LPAT would have the powers to substitute its own decision.
A diagram from Province's website depicting the proposed LPAT hearing process can be found in
"Attachment 1" to this report.
As further outlined below, to a certain extent, the LPAT would address many of TRCA's previous
comments concerning limiting the authority of the OMB, restricting appeal rights, reducing the
number of appeals and their timelines, and requiring stronger criteria for appeals based on sound
planning rationale. Despite these improvements, however, TRCA staff note that, appeals based
on a non -decision by Council would not be subject to the new conformity/consistency tests. In
these circumstances, the LPAT would retain the traditional approval powers of the OMB (i.e. to
approve, modify, or refuse an application). Moreover, outside of OPs, ZBLs and plans of
subdivisions (non -decisions), the modified appeals process would not apply to other Planning Act
applications (e.g. Site Plan, Consent, etc.). For appeals of subdivision applications, however, the
LPAT would now be required to refer any information and material introduced at a hearing back to
the municipality for reconsideration, where at present the OMB has discretionary powers to
determine whether new information should be sent back.
The Minister of Municipal Affairs would be afforded the authority to make appeals to the LPAT and
could advise if an OP or ZBL appeal would or could adversely affect provincial interest. If the
Minister provided this notice, the LPAT would retain the authority to make a decision but the new
powers of appeal afforded to the LPAT under the new model would not apply, and any decision
made would not be final until confirmed by the LGIC.
Expanded Control of Hearing Procedures
Mandatory Case Management: An important procedural change proposed is the requirement for
mandatory case conferences prior to a hearing (for appeals of OPs, ZBLs, and subdivisions).
While this would be congruent with current OMB practice regarding pre -hearing conferences and
encouraging mediation, mandatory case conferences would enable opportunities for settlement
and mediation early on in the LPAT process. This could necessitate increased staff time and
resources during the onset of a hearing, but may limit the overall cost and length associated with
TRCA's involvement by first identifying and narrowing the scope of issues, an important concern
TRCA staff raised previously.
354
Oral Hearings: OMB appeals are currently conducted "orally", whereby parties may call witnesses
to provide evidence orally (unless otherwise requested by the parties). This evidence can then be
tested through cross-examination, argument, and the submission of additional materials. Through
Bill 139, however, oral hearings would no longer be "as of right'. In the event that an oral hearing
is permitted by the Tribunal, no party or person could adduce evidence or call or examine
witnesses. Only a party or person identified at the request of the LPAT could make an oral
submission to be examined by the Tribunal (which may be time limited by a regulation not yet
released). At any stage in a proceeding, the LPAT would be empowered to "examine'— i.e.
examine a party to the proceeding; examine a person other than a party who makes a
submission; require a party/person to the proceeding to produce evidence for examination; or,
require a party to produce a witness for examination.
Rules and Procedures: The LPAT would be afforded the same general rule-making abilities
regarding hearing practice and procedure as is currently provided under the OMB. However, the
LPAT would have the ability to adopt alternative approaches to traditional adjudicative procedures
and the authority to appoint a person from among the parties to be a class representative where
parties have a common interest. That being said, Bill 139 proposes to provide the Minister with the
authority to make regulations, which could change the manner in which appeals are conducted,
including:
a) Setting out procedures governing appeal proceedings, rules regarding the conduct and
format of hearings, and practices regarding the admission of evidence and the format of
decisions;
b) Providing for and governing the composition of multi -member panels to hear proceedings
before the LPAT; and,
c) Prescribing timelines to proceedings on Planning Act appeals.
Extended Timelines for Decision Making
Bill 139 would extend the time municipalities have to make decisions (on OPs and ZBLs) by 30
days (210 days and 150 days, respectively). For decisions involving both OPAs and ZBLs, the
timeline would extend to 210 days. The amount of time a municipality would be provided to make
a decision on all other Planning Act applications would remain unchanged.
Limiting the Scope of Appeals / Removing Appeal Rights for Certain Planning Act
Applications
Bill 139 would limit or remove appeal rights for a range of planning decisions previously
appealable to the OMB, including: new interim control by-laws, OP policies and by-laws pertaining
to Major Transit Station Areas (which municipalities would be allowed to designate in OPs) and
two years for new Secondary Plans. In addition to limiting the grounds on which appeals can be
made (for OPs and ZBLs, inconsistency or non -conformity with a provincial policy or plan or
upper -tier OP), Bill 139 would also prohibit appeals of decisions relating to OPs where the
Minister is the approval authority. This would appear to address TRCA staffs previous comment
that the Planning Act be amended such that appeals to SPAs are added to the list of specified
provincial matters on which appeals are to be disallowed, where a comprehensive review of an
SPA has been undertaken and received ministerial approval. In addition, it is our understanding
that appeals of decisions relating to OP amendments to conform with the source protection
requirements of the Clean Water Act and its regulations would also be prohibited. TRCA staff will
be requesting confirmation of both interpretations.
355
Transition
Bill 139 charges the Minister with preparing regulations at a future date to address how matters
will be resolved that were commenced before the date the new legislation takes effect. TRCA staff
will monitor the release of any such regulation and report back, as needed.
Other Planning Act Changes
Bill 139 proposes to expand the list of "provincial plans' and "policy statements' currently defined
and described in the Planning Act. Policy statements would now also include those issued under
the Metrolinx Act, Resource Recovery and Circular Economy Act, and others which may require
Ministerial approval. Provincial plans would now also include policies referred to in the Lake
Simcoe Protection Act. Great Lakes Protection Act and Clean Water Act.
The scope of Local Appeal Bodies (LABs) would be expanded to include site plan control, in
addition to minor variances and consents. It remains to be seen whether appeals of complex site
plans (not associated with OP, ZBL, and subdivision applications) would still be heard at the
LPAT. The Province has only indicated, in the OMB Consultation Document, that this would allow
LABs to hear disputes on individual properties relating to, for example, landscaping, driveways or
lighting. Currently, Toronto is the only municipality within TRCA's jurisdiction to have a LAB.
Building on the climate change policies introduced in the recently amended Growth Plan for the
Greater Golden Horseshoe, proposed changes to the Planning Act through Bill 139 would require
OPs to contain policies that identify goals, objectives and actions for climate change adaptation
and the mitigation of greenhouse gas emissions. This appears to align with changes to the
Conservation Authorities Act proposed through Bill 139 that enable the creation of regulations
relating to the role of CAs in climate change mitigation and adaptation, including a regulation
pertaining to the review of planning documents for consistency with climate change -related
policies in the PPS. TRCA has long played a critical role in addressing climate change risks and
impacts of growth and urbanization in the Toronto region. As TRCA continues to advance
expertise in this area, staff are strategically positioned to aid municipalities in the development of
OP climate change policies.
Analysis and Key Recommendations
TRCA staff generally support the legislative changes proposed through Bill 139 and note that
many of TRCA's previous comments were addressed to varying degrees, including: creating the
LPASC to provide resources to community members to better navigate the appeals process;
requiring detailed planning justification to prevent unsubstantiated appeals and help agencies like
TRCA scope their involvement; extending timelines for municipalities to make decisions on
complex planning applications to reduce the number of appeals for non -decisions; retaining
mediation as an option while requiring case management to facilitate settlement and reduce the
length and cost of hearings; placing limits on appeals on matters of provincial interest; and
expanding the scope for dismissal of an appeal without a hearing if an application differs
substantially from the one on which council based its decision.
Many of TRCA's previous comments may eventually be addressed through future Ministerial
regulations enabled by Bill 139. For instance, provisions for transitional matters (i.e. to apply
current provincial planning rules to land use applications submitted prior to 2007), clarifying LPAT
roles and procedures, and prescribing rules for multi -member panels and their composition (i.e. to
increase the breadth of experience and consistency of decision making).
356
Although Bill 139 would address many of TRCA's former comments, staff provide the following
key recommendations that, if incorporated into Bill 139, would further strengthen the Province's
municipal planning and appeals process:
Enhancing the Role of Third Party Comments & Technical Review for LPAT
Appeals
TRCA staff recommend that the Planning Act be amended to require that municipalities
consult CAs during the municipal pre -consultation process prior to an application being
deemed "complete" and an appeal to the LPAT can ultimately be made. While language
exists in municipal OPs/ZBLs suggesting that other agencies maybe consulted, TRCA staff are
not always advised of municipal pre -consultation meetings and do not have the ability to provide
input into a municipality's determination that an application is "complete". As a result, technical
work that would be required to make an informed decision is often absent or incomplete when an
application is accepted, resulting in additional time spent requesting this work during the statutory
plan review period. In TRCA staff's experience, this delay often results in the expiration of the
statutory timeframe and an appeal being filed based on the municipality's failure to make a
decision, forcing TRCA staff into potentially avoidable appeal hearings without sufficient
opportunity to review technical information. Requiring the consultation of CAs in the determination
of "complete" applications would streamline the plan review process and limit the number of
appeals for non -decision in such cases.
2. Requiring Circulation to Conservation Authorities on Notices of Appeal
TRCA staff recommend that the Planning Act and the LPAT Act be amended to require that
CAs be circulated on notices of appeal to the LPAT where their areas of interest are
affected. In current practice, TRCA is often left out of circulations of notices of appeal by
municipalities, including background materials submitted with appeal packages. In these cases,
TRCA is pulled into a hearing process with little time to adequately prepare. Therefore, the
Planning Act and the LPAT Act should be further amended to ensure that all prescribed agencies
(including CAs) are copied on all notices of appeal that affect their areas of interest and to ensure
they can attend mandatory case management conferences.
3. Conservation Authorities as Prescribed Agencies
The status of a CA as a commenting agency is acknowledged in the supporting regulations of the
Planning Act. CAs have been delegated the responsibility to represent the provincial interest on
natural hazards encompassed by Section 3.1 of the PPS as outlined in the Conservation
Ontario/Ministry of Natural Resources and Forestry/Ministry of Municipal Affairs Memorandum of
Understanding (MOU) on CA delegated responsibilities. In 2010, the Province approved the
'Policies and Procedures for Conservation Authority Plan Review and Permitting Activities' which
provides clarity about the roles and responsibilities of CAs in the planning and permitting process.
In keeping with the Provincial MOU and policies and procedures, TRCA provides planning and
environmental advisory services to municipalities, implemented through MOUS and service
agreements. In this respect, TRCA is essentially acting as a technical advisor to municipalities.
These agreements cover TRCA's areas of technical expertise such as water management,
natural hazards and natural heritage. CAs also regulate development under their permitting
responsibilities under Section 28 of the Conservation Authorities Act.
357
The recent release of 'Conserving our Future: A Modernized Conservation Authorities Act', in
support of the proposed changes to the Conservation Authorities Act, as part of Schedule 4 of Bill
139, outlines the Province's intent to recognize in regulations, the current and future roles of CAs
in the planning process to assist the Province in achieving consistency with the PPS, "including
policies related to natural hazard policies and land use and development patterns that promote
climate change adaptation and mitigation." Therefore, TRCA staff recommend that CAs be
acknowledged as prescribed commenting agencies under the Local Planning Appeal
Tribunal Act.
4. Tightening the Basis for Appeal of Non -Decisions
TRCA staff welcome the extended time afforded to municipalities to make a decision on OPs and
ZBLs. Staff also generally support the proposed conformity/consistency tests outlining the basis
for appeal where Council has made a decision. However, as noted above, for appeals based on
failure to make a decision (a "non -decision"), the conformity/consistency test would not be
required and the Tribunal would be afforded the same powers provided currently to the OMB.
Where an initial appeal of a non -decision of an OP or ZBL is made, TRCA staff recommend
the Province consider directing the Tribunal to determine whether Council had just cause
in not making a decision within the statutory timeframe. Where appropriate, the LPAT should
return the matter to Council with recommendations and prescribe a reasonable timeframe and/or
information requirements necessary for a decision. If a decision could be made within the
extended timeframe, and an appeal was subsequently made in response to this decision, the
matter would be returned to council for review based on the conformity/consistency test. If Council
could not make a decision within the extended time period, the matter would be returned to the
Tribunal, where the existing powers and "standard of review" would apply (i.e. to approve, modify,
or refuse an application based on the principle of "optimal" planning).
5. Clarifying Appeals Involving Multiple Planning Act Applications
Appeals under the Planning Act often include a combination of associated applications to facilitate
their implementation. For instance, OPs and ZBLs are typically reviewed concurrently with related
subdivision and/or site plan applications. However, Bill 139 does not specify whether
subdivisions, site plans and Committee of Adjustment applications would be subject to the same
conformity/consistency appeal test as OPs/ZBLs, even if they collectively form part of the same
development proposal. TRCA staff suggest that Bill 139 be revised to clarify that the newly
proposed conformity/consistency tests (both as the basis for an appeal and for the
LPAT's final decision) will apply not only to OPs and ZBLs, but also to other associated
Planning Act applications.
6. Coordination with Provincial Policy & Legislation
It is unclear whether the Tribunal will seek consistency with all of the provincial plans/policies
defined and described in the Planning Act as the basis of the conformity/consistency test for an
appeal (or a final decision), or whether some will be prioritized over others. In TRCA's experience,
appeals can be heard based on compliance with a single section of the PPS or Provincial Plan
(e.g. intensification) without regard for other sections (e.g. section 3.1 of the PPS, regarding flood
hazards). LPAT appeals (and Tribunal decisions) should be based on a consistent and defensible
planning justification considered from a balanced and comprehensive assessment of the entire
current provincial policy and legislative framework, as well as implementing municipal documents.
TRCA staff recommend that the Province establish guidance materials outlining how the
conformity/consistency tests are to be operationalized, both as the basis of an appeal,
358
and for a Tribunal's decision. In doing so, the Province should clarify their involvement
and potential attendance in a hearing to represent the provincial interest. Additionally, it
should be explained that the Planning Act must be read in conjunction with all other applicable
land use policies, plans, regulations and/or standards (as amended from time to time) and specify
where more specific plans or regulations take precedence, as per the Implementation section of
the PPS (4.10, 4.11).
7. Qualifications and Training of Tribunal Members
Without adequate professional development on emerging or complex issues such as
environmental management, Tribunal members may not have the appropriate knowledge and
expertise to effectively manage hearings and issue decisions for the broad range of matters
brought before the LPAT. This issue is of particular importance given that the majority of evidence
used to inform Tribunal decisions would be in written format, fewer opportunities may exist, if at
all, for experts to explain or critique technical studies produced in support of written submissions.
TRCA staff request that the Province create a minimum standard of qualifications and
training for new Tribunal members.
8. Role of Technical Guidance on Provincial Interests
While Bill 139 has introduced new tests for appeals of OPs and ZBLs based on provincial policies
and plans, it remains silent on the role of technical criteria developed to provide guidance on
provincial interests. In TRCA staff's experience, opinions based on technical documents related
to the natural heritage and hazard policies of the PPS (e.g. Natural Heritage Reference Manual
and the Technical Guide for River and Stream Systems) are not given adequate weight during
appeal hearings. TRCA staff are concerned that this trend could continue under the new LPAT
model. Additionally, it may become increasingly difficult to reference, explain and expand upon
technical documents, given that written evidence would predominantly be used to inform Tribunal
decisions and cross-examination would no longer occur. Bill 139 states that the Province could
clarify whether a matter under appeal would adversely affect provincial interest, but the extent of
provincial involvement in doing so is yet to be determined and could rely on as -of -yet unpublished
regulations.
TRCA's concerns regarding the lack of weight given to technical criteria at hearings are
compounded given that recent amendments to the four provincial land use plans have introduced
progressive policies requiring environmental and planning criteria that will rely heavily on such
materials. For example, municipalities, partnering with CAs, are now required to undertake
watershed planning to ensure that growth occurs in an environmentally sustainable manner. The
Province has indicated that guidance materials and supplementary information will be produced
in support of these policies. In fact, TRCA is currently involved in the Province's' Watershed
Engagement Group" to help inform the development of a Watershed Planning Guidance
document in support of carrying out these very policies. TRCA staff would like to reiterate a
previous recommendation to clarify and strengthen the role of technical guidance on
provincial interests in LPAT decision-making, specifically those related to the natural
heritage and hazard policies of the PPS.
359
9. Applying Current Provincial Policies at the Time of Decision for Applications
Since 2007, the Planning Act has required that Planning Act decisions must be consistent with
provincial policies and conform to provincial plans that are in place at the time of a decision, rather
than when an application is made. The October, 2016, Provincial Consultation Document on
changes being considered to the OMB sought feedback on whether this requirement should be
amended. However, Bill 139 does not appear to have been changed to reflect this consideration.
In TRCA's experience, examples continue to arise of unbuilt subdivisions originally approved in
the 1970s, '80s and '90s, proposing to be developed at the present time in a manner which does
not meet the objectives of current provincial policies (e.g. natural hazards or significant
environmental features such as wetlands). If development proposals have not been built since
2007 (at the latest), there is no need to perpetuate planning decisions based on outdated policies
that have since been replaced following years, or even decades, of progressive advancements to
Ontario's land use planning and legislative framework. TRCA staff recommend that the
Minister utilize the powers bestowed through Bill 139 to remove "grandfathering" of all
Planning Act applications submitted before 2007 (or earlier) and that they be subject to
updated provincial policies and plans, which apply at the time of a decision or approval.
10. Future Ministerial Regulations
As noted above, Bill 139 enables the Minister to make regulations regarding: transitional matters
that commenced before the new legislation comes into effect; rules for the composition and
governance of multi -member LPAT panels; and, Tribunal practices and procedures - admission of
evidence, and the conduct and format of hearings, and structure of decisions. To this effect, a
number of the aforementioned recommendations could be addressed through the creation of
future regulations and, as such, TRCA staff would like to express our interest and desire to
participate in their initial formulation. We recommend that the Province undertake public
consultation on any and all regulations proposed pursuant to Bill 139 to provide agencies
like TRCA with the opportunity to contribute on the basis of our experience.
FINANCIAL DETAILS
TRCA staff are reviewing Bill 139 as part of existing budgets. No additional funding is required for
this review.
DETAILS OF WORK TO BE DONE
Incorporate feedback from the Executive meeting on August 11, 2017 into the submission
to the EBR by the deadline of August 14, 2017;
Attend any provincial training sessions on the proposed amendments and any associated
guidance materials;
Continue to work with TRCA's municipal partners, Conservation Ontario and the Province
in understanding the implications of the proposed amendments and timing of the pending
regulations to the operation of TRCA programs and delivery of services;
Coordinate internal consultations with senior management, planning and technical staff to
assess the implications of the OMB reformation (ongoing).
Report prepared by: Jeff Thompson, extension 5386
Emails: ithomason(dtrca.on.ca
For information contact: Carolyn Woodland, extension 5214
Emails: cwoodlandCZDtrca.on.ca
Date: August 11, 2017
Attachments: 1
360
Appeal to Tribunal
• Record of municipal decision is received bythe tribunal
Notice of appeal and mandatory case conference
Mandatory Case Conference
• Discuss opportunities for settlement, including mediation
• Identify, define and/or narrow issues
Mediation Hearing (as required)
May be on all or • Test: Whether municipal decision
some issues is con sistent/conforms with
provincial/local plans
Time limit for parties to make
argument to be set out in
regulation
No examination or cross
examination of witnesses
Sent back to, Tribunal upholds
municipality for municipal decision
reconsideration
Section IV — Ontario Regulation 166/06, As Amended
RES.#672/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Glenn De Baeremaeker
Seconded by: Mike Mattos
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.2 and 10.5 — 10.8 which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.2 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF MARKHAM
10.1 3803 MAJOR MACKENZIE DRIVE EAST
To construct, reconstruct, erect or place a building or structure and site grade on , (3803
Major Mackenzie Drive East), in the City of Markham, Rouge River Watershed. The
purpose is to undertake works within the Rouge River Watershed to recognize the
construction of a deck (approximately 436.8 square feet in size) and to remediate the
disturbed area adjacent to/within the valley corridor, undertaken in advance of a TRCA
permit. The works also includes the demolition of an existing metal shed situated
adjacent to the valley corridor. The proposed works will resolve the outstanding TRCA
violation (No. V2893) on the subject property.
CFN: 57594 - Application #: 0360/17/MARK
Report Prepared by: Aidan Pereira 5723 apereira@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: July 18, 2017
362
CITY OF PICKERING
10.2 1133373 ONTARIO INC.
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Part Lot 21, 22, 23, 24 Lot , Concession 3, (Taunton Road and Sideline
22), in the City of Pickering, Duffins Creek Watershed as located on the property owned
by 1133373 Ontario Inc.. The purpose is to construct a major a stormwater channel,
stormwater management plan, two stormwater outfalls and access road, and restore
with native planting.
CFN: 56659 - Application #: 1238/16/PICK
Report Prepared by: Steve Heuchert 5311 sheuchert@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: July 25, 2017
RES411373/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED — ERRATA APPLICATIONS
Moved by: Glenn De Baeremaeker
Seconded by: Mike Mattos
THAT a permit be granted in accordance with Ontario Regulation 166/06, as amended, for
application 10.3 that had been scheduled on the agenda as an errata application, for
which all the required information was received and finalized.
CARRIED
PERMIT APPLICATION EX10.3 IS A MAJOR APPLICATION - ERRATA
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency works, resolution of violations/after the fact permits, trail construction.
TOWN OF CALEDON
10.3 RITELAND DEVELOPMENT CORPORATION
To construct, reconstruct, erect or place a building or structure, site grade and interfere
with a wetland at 15877 Mount Wolfe Road, in the Town of Caledon, Humber River
Watershed as located on the property owned by Riteland Development Corporation. The
purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate grading and servicing works associated with an approved
residential draft plan of subdivision.
CFN: 57357.A - Application #: 0134/17/CAL
Report Prepared by: Adam Miller 5244 amiller@trca.on.ca
For information contact: Adam Miller 5244 amiller@trca.on.ca
Date: August 1, 2017
363
RES.#B74/17 - STANDARD DELEGATED PERMITS
Moved by: Glenn De Baeremaeker
Seconded by: Mike Mattos
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.4 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF BRAMPTON
CITY OF BRAMPTON - Humber River Watershed
The purpose is to widen and reconstruct Countryside Drive from approximately 370 m east of
Goreway Drive to McVean Drive in the City of Brampton. The warm water construction timing
window will be applied to this project.
CFN: 54720 - Application #: 1035/15/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: July 13, 2017
CITY OF BRAMPTON - Humber River Watershed
The purpose is to widen and reconstruct Countryside Drive from McVean Drive to The Gore
Road in the City of Brampton. The warm water construction timing window will be applied to this
project.
CFN: 54831 - Application #: 1119/15/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: January 13, 2017
364
CITY OF MARKHAM
ANGUS GLEN DEVELOPMENTS (2003) LTD. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a single family dwelling and a deck on the
subject property.
CFN: 57995 - Application #: 0644/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 14, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to replace an existing corrugated steel pipe culvert with a concrete box culvert
(Culvert #C205) located at Dickson Hill Road and 19th Avenue in the City of Markham. The
Ministry of Natural Resources and Forestry Redside Dace timing window will apply to this
project unless otherwise specified in writing by MNRF.
CFN: 56614 - Application #: 1222/16/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: July 20, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to replace an existing corrugated steel pipe culvert with a concrete box culvert
(Culvert #CO23) located at Personna Boulevard, near Woodbine Avenue and Major Mackenzie
Drive East in the City of Markham. The Ministry of Natural Resources and Forestry Redside
Dace timing window will apply to this project unless otherwise specified in writing by MNRF.
CFN: 56615 - Application #: 1223/16/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: July 20, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to replace an existing corrugated steel pipe culvert and replace with retaining
wall and concrete box culvert (Culvert #C059) located at 19th Avenue, near McCowan Road in
the City of Markham. The Ministry of Natural Resources and Forestry Redside Dace timing
window will apply to this project unless otherwise specified in writing by MNRF.
CFN: 56616 - Application #: 1224/16/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: July 20, 2017.
365
CITY OF MARKHAM - Rouge River Watershed
The purpose is to construct trail and pedestrian bridge works within Area 4 of the City of
Markham's Multi -Use Pathway within Milne Dam Conservation Park. The Ministry of Natural
Resources and Forestry (MNRF) warm water fisheries timing window will apply to this project
unless otherwise specified in writing by MNRF.
CFN: 57966 - Application #: 0747/17/MARK
Report Prepared by: Suzanne Bevan, extension 5759, email sbevan@trca.on.ca
For information contact: Suzanne Bevan, extension 5759, email sbevan@trca.on.ca
Date: July 11, 2017
CONDOR PROPERTIES LTD. - Don River Watershed
The purpose is to complete contaminated lands site remediation works within a Regulated area
adjacent to Pomona Mills Creek.
CFN: 57434 - Application #: 0205/17/MARK
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: June 29, 2017
HUMBOLD GREENSBOROUGH VALLEY HOLDINGS LIMITED - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate site alteration and grading, which includes import of fill on the
subject property.
CFN: 57909 - Application #: 0602/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 21, 2017
52 FRED VARLEY DRIVE - Rouge River Watershed
The purpose is to undertake works in TRCA's Regulated Area of the Rouge River Watershed in
order to demolish an existing one -storey dwelling to facilitate the construction of a new two-
storey dwelling on the subject property.
CFN: 58181 - Application #: 0788/171MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 5, 2017
19 VICTORIA AVENUE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to demolish an existing deck to facilitate the construction of a replacement
deck, interlocking patio, an additional door to a existing garage and landscaping on the subject
property.
366
CFN: 58098 - Application #: 0714/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 4, 2017
21 RAE CRESCENT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of a deck approximately 437.85 square feet in size, at
the rear of the existing dwelling.
CFN: 58221 - Application #: 0830/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 18, 2017
UPPER UNIONVILLE INC. - Rouge River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
watershed in order facilitate the clean-out of an existing stormwater management pond
associated with a residential plan of subdivision prior to municipal assumption in the City of
Markham..
CFN: 57630 - Application #: 0455/171MARK
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 27, 2017
WEINS CANADA INC. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to facilitate the construction of a new four -storey building (total site area of 4,427.05 square
metres) with an associated five -level parking structure (14,535 square metres) and a total of 648
parking spaces.
CFN: 56278 - Application #: 0848/16/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 24, 2017
108 SCIBERRAS ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of two-storey replacement dwelling and deck on the
subject property.
CFN: 58080 - Application #: 0713/171MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 3, 2017
367
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA - Etobicoke Creek Watershed
The purpose is to rehabilitate an existing bridge structure that spans over Etobicoke Creek on
Matheson Boulevard, in the City of Mississauga. The warm water construction timing window
will apply to this project.
CFN: 57268 - Application #: 0192/17/MISS
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: July 14, 2017
CITY OF PICKERING
496 ROUGEMOUNT DRIVE - Rouge River Watershed
The purpose is to reconstruct a deck to the rear of the existing single family detached dwelling
located at 496 Rougemount Drive in the City of Pickering.
CFN: 58032 - Application #: 0663/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 12, 2017
NORTH PICKERING COMMUNITY MANAGEMENT INC. - Duffins Creek Watershed
The purpose is to construct a 975 mm diameter trunk sanitary sewer along Rossland Road (3rd
Concession Road) from Valley Farm Road westerly for approximately 1.8 km as part of the
servicing for the new Seaton community in the City of Pickering.
CFN: 56655 - Application #: 1228/16/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: July 5, 2017
THE CORPORATION OF THE CITY OF PICKERING - Duffins Creek Watershed
The purpose is to rehabilitate and widen Palmer Bridge located on Valley Farm Road,
approximately 240 m north of Finch Avenue in the City of Pickering. The warm water
construction timing window will be applied to this project.
CFN: 57219 - Application #: 0069/17/PICK
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: July 14, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
835 ROYAL YORK ROAD - Mimico Creek Watershed
The purpose is to construct a replacement retaining wall, at -grade patio, and associated
landscaping in the side/rear yard of the existing single family detached dwelling at 835 Royal
York Road in the City of Toronto (Etobicoke York).
CFN: 57430 - Application #: 0200/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: February 21, 2017
123 BABY POINT ROAD - Humber River Watershed
The purpose is to construct a second storey addition over the garage at the existing single
family dwelling at 123 Baby Point Road in the City of Toronto (Etobicoke York Community
Council Area).
CFN: 57878 - Application #: 0578/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 17, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing pedestrian bridge at The Elms Park, located on the east
side of Islington Avenue, between Golfdown Drive and Bergamot Avenue. Works will involve
removal and replacement of the existing bridge and abutments. The warm water construction
timing window of July 1 to March 31 will apply to this proposal.
CFN: 57275 - Application #: 0474/171TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: July 24, 2017
37 LA RUSH DRIVE - Humber River Watershed
The purpose is to construct a second storey addition above the existing one storey single family
dwelling at 37 La Rush Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 56625 - Application #: 1141/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 27, 2017
67 BONNYVIEW DRIVE - Mimico Creek Watershed
The purpose is to construct a front main floor addition and second storey addition above the
existing garage at 67 Bonnyview Drive in the City of Toronto (Etobicoke York Community
Council Area).
369
CFN: 57915 - Application #: 0615/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 14, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
18 ROYCREST AVENUE - Don River Watershed
The purpose is to construct new additions to the existing dwelling located at 18 Roycrest
Avenue in the City of Toronto (North York Community Council Area).
CFN: 55889 - Application #: 0461/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 27, 2017
23 GROVELAND CRESCENT - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage at 23
Groveland Crescent in the City of Toronto (North York Community Council Area).
CFN: 57721 - Application #: 0403/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 25, 2017
116 BROOKBANKS DRIVE - Don River Watershed
The purpose is to remove an existing encroachment and restore the valley slope as well as
construct a swim spa with associated decking and stone paver patio at 116 Brookbanks Drive in
the City of Toronto (North York Community Council Area).
CFN: 56800 - Application #: 1137/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 10, 2017
149 BURBANK DRIVE - Don River Watershed
The purpose is to construct a two-storey replacement dwelling with rear deck and basement
walk -out at 149 Burbank Drive in the City of Toronto (North York Community Council Area).
CFN: 56347 - Application #: 0817/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 11, 2017
370
TORONTO AND DISTRICT SCHOOL BOARD - Don River Watershed
The purpose is to restore an eroded portion of the slope and existing running track
CFN: 53590 - Application #: 0341/151TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 20, 2017
TORONTO COMMUNITY HOUSING CORPORATION - Don River Watershed
The purpose is to construct a residential subdivision with a public road, a 498 unit condominium
and 115 rental housing units. The first phase of work will involve site grading and the installation
of municipal servicing.
CFN: 58021 - Application #: 0674/171TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: June 23, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
JESK ENTERPRISES LIMITED - Highland Creek Watershed
The purpose is to undertake grading, landscaping and servicing as part of the construction of a
new 2 storey industrial building at 2215 Markham Road in the City of Toronto (Scarborough
Community Council Area),
CFN: 58186 - Application #: 0793/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 7, 2017
39 FISHLEIGH DRIVE - Waterfront Watershed
The purpose is to construct a two-storey replacement dwelling with rear decks, patio and in -
ground swimming pool at 39 Fishleigh Drive in the City of Toronto (Scarborough Community
Council Area).
CFN: 56456 - Application #: 0900/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 11, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
69 STRATHEARN ROAD - Don River Watershed
The purpose is to construct a two-storey replacement dwelling at 69 Strathearn Road in the City
of Toronto (Toronto and East York Community Council Area).
371
CFN: 57383 - Application #: 0146/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 18, 2017
CITY OF TORONTO - Don River Watershed
The purpose is to undertake improvements to an existing trail in Taylor Creek Park. No in -water
work is within the scope of this project.
CFN: 57320 - Application #: 00731171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: June 14, 2017
30 HILLSIDE DRIVE - Don River Watershed
The purpose is to construct second storey additions to the front and rear of the existing 1'/z
storey single family detached dwelling at 30 Hillside Drive. This proposal also includes a deck
above the existing one -storey addition at the rear of the dwelling..
CFN: 56671 - Application M 0971/16/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 14, 2017
151-157 HUDSON DRIVE - Don River Watershed
The purpose is to construct a new two-storey single family detached dwelling with a new patio
and retaining wall to the rear on the residential lots located at 151, 153, and 157 Hudson Drive
in the City of Toronto (Toronto and East York).
CFN: 55596 - Application #: 0244/161TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 14, 2016
139 HUDSON DRIVE - Don River Watershed
The purpose is to repair and reinforce the building foundation at north east corner of the existing
single family detached dwelling at 139 Hudson Drive in the City of Toronto (Toronto and East
York).
CFN: 57438 - Application #: 0218/171TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: July 18, 2017
372
159 HUDSON DRIVE - Don River Watershed
The purpose is to construct a deck to the rear and reconstruct the second storey above the
existing one -storey single family detached dwelling at 159 Hudson Drive in the City of Toronto
(Toronto and East York).
CFN: 55973 - Application #: 0547/16/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 10, 2017
THE ROEDER HUEHN GROUP LTD. - Don River Watershed
The purpose is to construct a second storey addition to the rear, a basement walk -out to the
front, and underpin to lower the existing basement of the semi-detached single family dwelling
at 6 Winnifred Avenue in the City of Toronto (Toronto and East York).
CFN: 58069 - Application #: 0695/171TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 28, 2017
CITY OF VAUGHAN
33 WIGSTON PLACE - Don River Watershed
The purpose is to facilitate, in TRCA's Regulated Area of the Don River Watershed, site grading
to support the eventual development of single detached dwellings on lands known municipally
as 33 Wigston Place, in the City of Vaughan.
CFN: 58074 - Application #: 0710/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 11, 2017
30 INTERSITE PLACE - Humber River Watershed
The purpose is to stabilize the eroding bank of the East Humber River Tributary at 30 Intersite
Place near Pine Valley Drive and Langstaff Road. The Redside Dace timing window of July 1 to
September 15 will apply to this proposal unless otherwise specified in writing by Ministry of
Natural Resources and Forestry.
CFN: 56599 - Application #: 0306/17/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: July 24, 2017
63 PIONEER LANE - Humber River Watershed
The purpose is to construct a second floor addition to the existing dwelling, facilitated within a
mansard roof. The works are proposed within a Regulated Area of the Humber River Watershed
at 63 Pioneer Lane in the City of Vaughan.
373
CFN: 58070 - Application #: 0693/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 24, 2017
CITY OF VAUGHAN - Don River Watershed
The purpose is to construct an extension of the Bartley Smith multi use trail located north west
of Keele Street and Rutherford Road, in the City of Vaughan, Regional Municipality of York. The
warm water construction timing window will apply to the proposal..
CFN: 56620 - Application #: 1125/16NAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: July 5, 2017
CITY OF VAUGHAN - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate construction of a storm sewer and outfall structure, which
discharges into an existing stormwater management pond (Edgeley Pond) at the northeast
corner of Jane Street and Highway 7, in the City of Vaughan.
CFN: 57148 - Application #: 0363/171VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: July 21, 2017
ROYBRIDGE HOLDINGS LTD. - Humber River Watershed
The purpose is to permit development within a Regulated Area of the Humber River Watershed
(Rainbow Creek) to facilitate site development and the enclosure of an existing 136.85 sq. m
(1,473.04 sq. ft.) outdoor patio as part of an expansion to the existing restaurant on the subject
property at 8000 Highway No. 27, in the City of Vaughan. There are no proposed changes to
the existing paved asphalt parking lot or landscaping with the exception of minor curbing and
surface repair to the parking area..
CFN: 58237 - Application #: 0840/17/VAUG
Report Prepared by: Mark Andrews, extension 5936, email mandrews@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: July 26, 2017
42 RIVERSIDE BOULEVARD - Don River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River watershed, the
development of a 139.82 sq. m. (1505 sq. ft.) addition to an existing dwelling on lands known
municipally as 42 Riverside Boulevard, in the City of Vaughan.
CFN: 57873 - Application #: 0540/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 25, 2017
374
TORONTO TRANSIT COMMISSION - Humber River Watershed
The purpose is to construct a driveway between Jane Street and the Pioneer Village Station
parking lot, widen a section of Jane Street and install a new storm sewer and temporary
sediment control pond located east side of Jane Street between UPS Services Driveway and
CNR Crossing.
CFN: 56853 - Application #: 0194/17NAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: July 11, 2017
5336 LANGSTAFF ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 600.99 sq. m. (6,469 sq. ft.) single family
dwelling and a driveway, associated with a municipal building permit. The subject property is
located on lands known municipally as 5336 Langstaff Road, in the City of Vaughan.
CFN: 56545 - Application #: 0998/16NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
Date: July 24, 2017
TOWN OF AJAX
2929 BEACHVIEW STREET - Carruthers Creek Watershed
The purpose is to undertake site grading and filling to facilitate the construction of a new two-
storey single family detached dwelling at 2929 Beachview Street in the Town of Ajax. This
proposal also includes the installation of a culvert to the front and rear portion of the residential
property.
CFN: 56482 - Application #: 0929/161AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 6, 2017
TOWN OF AJAX - Carruthers Creek Watershed
The purpose is to construct a new playground in an existing park south of Audley Road South
and west of Hoile Drive in the Town of Ajax. No in -water works are associated with this project.
CFN: 57936 - Application #: 0770/17/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: July 20, 2017
375
TOWN OF CALEDON
9 LIGHTHEART DRIVE - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 11.7 m. (38ft.) by 4.8 m. (15ft.) wood deck
located at the rear yard of an existing residential dwelling associated with a municipal building
permit.
CFN: 57997 - Application M 0640/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 7, 2017
18571 CENTREVILLE CREEK ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 555.1 square metre (5,975.04 square feet)
two-storey dwelling and septic system associated with a municipal Site Plan application (SPA
16-0056) and building permit.
CFN: 57012 - Application M 1241/16/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: July 5, 2017
14 LINN ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 11.5 m. (38ft.) by 5.4 m. (18ft.) in -ground
swimming pool and 3.0 m. (1 Oft.) by 2.4 m. (8ft.) storage shed at the rear yard of an existing
residential dwelling associated with a municipal building permit.
CFN: 58175 - Application M 0756/171CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 7, 2017
6808 COOLIHANS SIDE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 162.11 sq. m (1,745 sq. ft) two storey
addition to existing residential dwelling and a minor driveway addition associated with a
municipal building permit and Niagara Escarpment Commission (NEC) Development Permit
application (P/R/2016-2017/440).
CFN: 58038 - Application M 0682/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 12, 2017
376
24 CULPEPPER COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 9.7 m (32 ft) by 4.8 m (16 ft) in -ground pool,
a 3.6 m (12 ft) by 6 m (20 ft) pool cabana and surrounding patio area associated with a
municipal building permit.
CFN: 57991 - Application #: 0700/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 20, 2017
TOWN OF CALEDON - Humber River Watershed
The purpose is to replace a triple cell CSP culvert on Centreville Creek Road, approximately
1.24 km south of Old Church Road in the Town of Caledon. The Redside Dace construction
timing window will be applied to this project unless otherwise specified in writing by the Ministry
of Natural Resources and Forestry (MNRF).
CFN: 56463 - Application #: 0305/171CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: July 25, 2017
TOWN OF RICHMOND HILL
TOWN OF RICHMOND HILL - Humber River Watershed
The purpose is to construct the Lake Wilcox Park Youth Area at 12895 Bayview Avenue. The
Redside Dace timing window of July 1 to September 15 will apply to this proposal unless
otherwise specified in writing by Ministry of Natural Resources and Forestry (MNRF).
CFN: 55929 - Application #: 0260/17/RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: July 18, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
1589212 ONTARIO INC. - Duffins Creek Watershed
The purpose is to allow development within a Regulated Area of the Duff ins Creek Watershed to
facilitate the development of a residential estate lot subdivision at 13876 Ninth Line, in the Town
of Whitch urch-Stouffville.
CFN: 58006 - Application #: 0661/17/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: June 5, 2017
377
TOWNSHIP OF KING
44 HILL FARM ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate site grading and the construction of a 55.66 sq.m. (598.47 sq.ft.)
two-storey addition associated with a municipal building permit. The subject property is located
on lands municipally known as 44 Hill Farm Road in the Township of King.
CFN: 57876 - Application #: 0545/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 5, 2017
48 HOLDEN DRIVE - Humber River Watershed
The purpose is to construct a 14.26 sq.m. (64.58 sq.ft.) addition with a basement walk -out at the
rear of the existing dwelling within the Regulated Area of the Humber River Watershed at 48
Holden Drive in the Township of King.
CFN: 58114 - Application #: 0765/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 18, 2017
82 ELIZABETH DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 52.76 sq.m. (567.91 sq.ft.) ground floor
addition and a covered porch associated with a municipal building permit.
CFN: 58220 - Application #: 0812/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 25, 2017
EDGECORE INVESTMENTS INC. - Humber River Watershed
The purpose is to facilitate, in TRCA's Regulated Area of the Humber River Watershed, soil and
channel remediation works and the installation of a temporary culvert crossing on lands known
municipally as 6178, 6220-6230, and 6288 King Road, in the Town of Nobleton.
CFN: 57906 - Application #: 0604/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 28, 2017
378
105 KINGSWORTH ROAD - Humber River Watershed
The purpose is to facilitate, in TRCA's Regulated Area of the Humber River Watershed, the
development of a 498.7 sq. m. (5360 sq. ft.) single detached dwelling, a 67 sq. m. (721 sq. ft.) in
ground pool, a new septic system, and associated landscaping on lands known municipally as
105 Kingsworth Road, in the Township of King.
CFN: 58187 - Application #: 0801/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 12, 2017
178 NORMAN DRIVE - Humber River Watershed
The purpose is to facilitate, in TRCA's Regulated Area of the Humber River Watershed, the
development of a 655 sq. m. (7059 sq. ft.) dwelling, a 9.6 sq. m. (104 sq. ft.) cabana, a 50 sq.
m. (538 sq. ft.) in -ground pool, and associated landscaping on lands known municipally as 178
Norman Drive, in the Township of King.
CFN: 57725 - Application #: 0429/1711KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 11, 2017
6475 17TH SIDEROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a new 422.84 sq.m. (4,542.37) one -storey
detached dwelling and septic system associated with a municipal building permit.
CFN: 58292 - Application #: 0850/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 26, 2017
TOWNSHIP OF UXBRIDGE
2458 6TH CONCESSION ROAD - Duff ins Creek Watershed
The purpose is to undertake site grading and construct a new two-storey single family detached
dwelling, inground pool, cabana and septic bed on the vacant residential lot at 2458 Concession
Road 6 in the Township of Uxbridge.
CFN: 57754 - Application #: 0457/17/UXB
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 6, 2017
379
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
2193914 CANADA LIMITED
To undertake sewer and watermain or utility installation or maintenance within an easement
located west of Conestoga Drive and south of Dalzell Avenue, in the City of Brampton,
Etobicoke Creek Watershed as located on the property owned by 2193914 Canada Limited, a
subsidiary of Enbridge Gas Distribution Inc. A portion of the work site is to be located on
property owned by the City of Brampton, with whom Enbridge Gas Distribution Inc. has a
franchise agreement. The purpose is to perform an integrity dig. No in -water works are
associated with this project.
CFN: 57949 - Application #: 0759/17/BRAM
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: July 5, 2017
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA
To undertake road/pathway resurfacing or reconstruction along Etobicoke Creek from Ponytail
Drive to near Rathburn Road, in the City of Mississauga, Etobicoke Creek Watershed, as
located on the property owned by City of Mississauga and the Toronto and Region
Conservation Authority, under management agreement with City of Mississauga. The purpose
is to resurface an existing trail that runs along Etobicoke Creek (identified as Sections A and B)
from Ponytail Drive to near Rathburn Road. The warm water construction timing window will
apply to this project.
CFN: 57968 - Application #: 0764/17/MISS
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: July 26, 2017
CITY OF MISSISSAUGA
To undertake road/pathway resurfacing or reconstruction along Etobicoke Creek from Britannia
Road East to Dixie Road, and between Derry Road East and Highway 7, in the City of
Mississauga, Etobicoke Creek Watershed, as located on the property owned by City of
Mississauga. The purpose is to resurface an existing trail that runs along Etobicoke Creek
(identified as Sections F, G and H) from Britannia Road East to Dixie Road, and between Derry
Road East and Highway 7, in the City of Mississauga. The warm water construction timing
window will apply to this project.
CFN: 57969 - Application #: 0768/17/MISS
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: July 26, 2017
CITY OF MISSISSAUGA
To undertake road/pathway resurfacing or reconstruction along Etobicoke Creek from Eglinton
Avenue East to Britannia Road East, in the City of Mississauga, Etobicoke Creek Watershed, as
located on the property owned by City of Mississauga. The purpose is to resurface an existing
trail that runs along Etobicoke Creek (identified as Sections C, D and E) from Eglinton Avenue
East to Britannia Road East, in the City of Mississauga. The warm water construction timing
window will apply to this project.
CFN: 57970 - Application #: 0769/17/MISS
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: July 26, 2017
CITY OF PICKERING
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain, utility installation or maintenance within an existing roadway
and to undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Finch Avenue, from Huntsmill Drive to Dixie Road, in the City of Pickering, Frenchman's Bay
Watershed as located on property owned by the Regional Municipality of Durham. The purpose
is to install a 100 mm diameter conduit for Rogers Communication Canada Inc. along Finch
Avenue, from Huntsmill Drive to Dixie Road, in the City of Pickering. No in -water works are
associated with this project.
CFN: 58083 - Application #: 0751/171PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: July 28, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on King Georges Drive, near Keele Street and Eglinton Avenue West, in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed, as located on
property owned by the City of Toronto. The purpose is to undertake telephone service
upgrades. Works will involve removal and replacement of the existing telephone conduits. No in -
water works are within the scope of this project.
CFN: 54710 - Application #: 0107/16/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: July 7, 2017
381
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Dundas Street West, from Burnhamthorpe Crescent to Montgomery Road, and Islington
Avenue, south of Dundas Street West, in the City of Toronto (Etobicoke York Community
Council Area), Mimico Creek Watershed as located on property owned by the City of Toronto.
The purpose is to install conduit and grade level boxes. No in -water work is within the scope of
this project.
CFN: 57677 - Application #: 0745/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: July 21, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and undertake structure maintenance
at Blythwood Ravine Park, located at 1200 Mount Pleasant Road, in the City of Toronto (North
York Community Council Area), Don River Watershed as located on property owned by the City
of Toronto. The purpose is to replace the existing staircase and undertake a portion of trail
resurfacing. No in -water work is within the scope of this project.
CFN: 56906 - Application #: 1283/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: July 17, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on McCowan Road near Nugget Avenue, in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed, as located on property owned by the
City of Toronto, the Canadian Pacific Railway Company, and private property with permission
obtained. The purpose is to carry out repairs on an existing sanitary sewer maintenance
chamber. No in -water works are within the scope of this project.
CFN: 56237 - Application #: 0771/161TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: August 1, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Birchmount Road, from Eglinton
Avenue East to St. Clair Avenue East, in the City of Toronto (Scarborough Community Council
Area), Don River Watershed as located on property owned by the City of Toronto. The purpose
is to undertake road resurfacing. The warm water construction timing window of July 1st to
March 31 st will be applied to this project.
382
CFN: 57675 - Application #: 0688/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: July 21, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake structure maintenance at Glen Edyth Drive Parkette, located at 5 Glen Edyth
Drive, northwest of Davenport Road and Dupont Street, in the City of Toronto (Toronto and East
York Community Council Area), Don River Watershed as located on the property owned by the
City of Toronto. The purpose is to reconstruct an existing staircase. No in -water work is within
the scope of this project.
CFN: 57674 - Application #: 0689/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: July 28, 2017
CITY OF VAUGHAN
ALECTRA UTILITIES
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Balding Boulevard near Pine Valley Drive and Langstaff Road, in the City of
Vaughan, Humber River Watershed as located on the property owned by the City of Vaughan.
The purpose is to replace an existing cable within the road -right-of-way using horizontal
directional drilling and hand digging on Balding Boulevard near Pine Valley Drive and Langstaff
Road in the City of Vaughan. The cold water construction timing window will apply to this
project.
CFN: 56649 - Application #: 0247/17/VAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: July 17, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within a future roadway
within a new subdivision located north of Teston Road and west of Kipling Avenue, in the City of
Vaughan, Humber River Watershed as located on property owned by the City of Vaughan,
under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a 4"
gas pipe along Kleinburg Summit Way in order to service a new subdivision. No in -water works
are associated with this project.
CFN: 57839 - Application #: 0572/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: July 20, 2017
383
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Kleinburg Summit Way, north of Stegman's Mill Road, in the City of Vaughan, Humber River
Watershed as located on property owned by the City of Vaughan, under a franchise agreement
with Enbridge Gas Distribution Inc. The purpose is to install 2" and 4" gas pipelines and a
district station in order to service a new subdivision. No in -water works are within the scope of
this project.
CFN: 57939 - Application #: 0763/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 1, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within future roadways on
Kleinburg Summit Way, First Nations Trail, and Enclave Court, in the City of Vaughan, Humber
River Watershed as located on the property owned by the City of Vaughan, under a franchise
agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 4 PE IP gas
pipeline and a NPS 2 PE IP gas pipeline. No in -water works are associated with this project.
CFN: 57947 - Application #: 0773/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: July 14, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing and
proposed roadway on the north side of Highway 7, west of Sylvan Brook Avenue, in the City of
Vaughan, Humber River Watershed as located on the property owned by the Regional
Municipality of York, under a franchise agreement with Enbridge Gas Distribution Inc. The
purpose is to install a new NPS 8 ST DFBE IP gas pipeline, which will replace an existing NPS
8 ST IP gas main. The warmwater construction timing window applies to this project.
CFN: 57950 - Application #: 0774/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: July 14, 2017
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing road
allowance of a new street, located north of Rossland Road West and west of Marsh Lane, in the
Town of Ajax, Duffins Creek Watershed as located on an easement belonging to Enbridge Gas
Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline in order to service a new
subdivision. No in -water works are associated with this project.
. A
CFN: 57948 - Application #: 0772/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: July 14, 2017
TOWN OF RICHMOND HILL
REGIONAL MUNICIPALITY OF YORK
To undertake sewer and watermain or utility installation or maintenance within the property
limits of 125 Pugsley Avenue, a York Region Housing complex, located in the Town of
Richmond Hill, Don River Watershed as located on the property owned by Regional Municipality
of York. The purpose is to upgrades to an existing natural gas generator located at 125 Pugsley
Avenue in the Town of Richmond Hill, Don River Watershed on property owned by the Regional
Municipality of York.
CFN: 57570 - Application #: 0501/17/RH
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: May 3, 2017
TRANSCANADA PIPELINES LIMITED
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway north of 11300 Bayview Avenue, in the Town of Richmond Hill, Rouge River
Watershed as located on the property owned by Holy Trinity School, with access granted
through an easement and a Permission to Enter agreement. The purpose is to undertake an
integrity dig and associated pipe maintenance on a natural gas pipeline owned by TransCanada
Pipelines Limited.
CFN: 58132 - Application #: 0783/171RH
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: July 24, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
47 BELLEVILLE DRIVE
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 119, Plan, 47 Belleville Drive, in the City of Brampton, Humber River
Watershed.
CFN: 58214 - Application #: 0802/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 27, 2017
40 ESKER DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 54, Plan 43M-537, 40 Esker Drive, in the City of
Brampton, Etobicoke Creek Watershed.
CFN: 58268 - Application #: 0841/171BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 27, 2017
16 VALLEYSIDE TRAIL
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 76, Plan
43M-1629, 16 Valleyside Trail, in the City of Brampton, Humber River Watershed.
CFN: 58235 - Application #: 0835/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 25, 2017
CITY OF MARKHAM
168 HUNTINGTON PARK DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 189, Plan
65M-2062, (168 Huntington Park Drive), in the City of Markham, Don River Watershed.
CFN: 58189 - Application #: 0809/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 14, 2017
85 DURIE LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5,
Concession 2, (85 Durie Lane), in the City of Markham, Don River Watershed.
i •
CFN: 58250 - Application #: 0845/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 24, 2017
CITY OF PICKERING
1445 PARKHAM CRESCENT
To construct a ground floor addition up to 50 sq. m (538 sq. ft) and construct a ground floor
addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on
Part 1 Lot 41, Plan WR -275, (1445 Parkham Crescent), in the City of Pickering, Frenchman's
Bay Watershed.
CFN: 58232 - Application #: 0827/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 24, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
68 SOUTH KINGSWAY
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 64, Plan
2663, (68 South Kingsway), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 58173 - Application #: 0755/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 26, 2017
64 TRIPLE CROWN AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 190, Plan
07571-1280, (64 Triple Crown Avenue), in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed.
CFN: 58125 - Application #: 0797/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 24, 2017
387
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
60 BARONIAL COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 90, Plan M-1983, (60 Baronial Court), in the City of
Toronto (Scarborough Community Council Area), Waterfront Watershed.
CFN: 58245 - Application #: 0842/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 24, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
124 PARK ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 22, Plan 104,
(124 Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don
River Watershed.
CFN: 58190 - Application #: 0805/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 24, 2017
CITY OF VAUGHAN
8 FILOMENA COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 65, Plan 65M2934, (8 Filomena Court), in the City of
Vaughan, Humber River Watershed.
CFN: 57866 - Application #: 0533/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 17, 2017
34 MILANO AVENUE
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 11, Concession 8, (34 Milano Avenue), in the City of Vaughan, Humber River
Watershed.
CFN: 58071 - Application #: 0692/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Polina Barn, extension 5256, email polina.bam@trca.on.ca
Date: July 13, 2017
161 WAYMAR HEIGHTS BOULEVARD
To construct, reconstruct, erect or place a building or structure, site grade and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on Lot 22,
Plan 4134, (161 Waymar Heights Boulevard), in the City of Vaughan, Humber River Watershed.
CFN: 58111 - Application #: 0767/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 13, 2017
62 CROMDALE RIDGE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition or
structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 13, Plan
65M-2604, (62 Cromdale Ridge), in the City of Vaughan, Humber River Watershed.
CFN: 58247 - Application M 0848/17/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 25, 2017
148 FARRELL ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 94, Plan,
(148 Farrell Road), in the City of Vaughan, Don River Watershed.
CFN: 58216 - Application M 0798/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 18, 2017
185 GRANDVISTA CRESCENT
To install a swimming pool on Part Lot 17, Concession 6, (185 Grandvista Crescent), in the City
of Vaughan, Humber River Watershed.
CFN: 58249 - Application M 0849/171VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 26, 2017
some
201 GLENFOEST DRIVE
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) on , (201 Glenforest Drive), in the City of Vaughan, Don River
Watershed.
CFN: 58178 - Application #: 0789/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: July 20, 2017
TOWN OF CALEDON
20 DEER VALLEY DRIVE
To install a swimming pool on Lot 79, Plan 43M-65, 20 Deer Valley Drive, in the Town of
Caledon, Humber River Watershed.
CFN: 58217 - Application #: 0800/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: July 13, 2017
TOWN OF RICHMOND HILL
44 CEDAR SPRINGS DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on , (44 Cedar Springs Drive), in the
Town of Richmond Hill, Don River Watershed.
CFN: 58188 - Application #: 0810/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: July 17, 2017
71 COLLIN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 13, Plan
65M - 4316, (71 Collin Court), in the Town of Richmond Hill, Don River Watershed.
CFN: 58215 - Application #: 0799/17/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 19, 2017
26 PHEASANT DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (26 Pheasant
Drive), in the Town of Richmond Hill, Humber River Watershed.
390
CFN: 58184 - Application #: 0790/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: July 17, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
43 MAUROVISTA COURT
To install a swimming pool on , (43 Maurovista Court), in the Town of Whitch urch-Stouffville,
Duffins Creek Watershed.
CFN: 58118 - Application #: 0766/17NVS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: July 5, 2017
TOWNSHIP OF KING
124 LYNWOOD CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 124 Lynwood
Crescent, in the Township of King, Humber River Watershed.
CFN: 58116 - Application #: 0741/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: July 11, 2017
PERMIT APPLICATIONS 10.5 — 10.8 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive Modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
10.5 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere, at Chorley Park (245 Douglas Drive, north of Roxborough Drive), in the
City of Toronto (Toronto and East York Community Council Area), Don River Watershed,
as located on property owned by the City of Toronto. The purpose is to construct a
switchback trail connection. Works will involve construction of a new switchback trail
connection and restoration of the existing trails to a natural state. No in -water works are
within the scope of this project.
391
CFN: 57799 - Application #: 0775/17/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Ralph Toninger 5366 rtoninger@trca.on.ca
Date: August 8, 2017
TOWN OF RICHMOND HILL
10.6 AUTUMNHILL INVESTMENT LTD. C/O DG GROUP
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Lot 27, Concession
2, (11011 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as
located on the property owned by Autumnhill Investment Ltd. c/o DG Group. The
purpose is to undertake works within a TRCA Regulated Area of the Rough River
Watershed to facilitate preliminary site alteration and grading, importing a large volume
of fill, and implement temporary stormwater management facilities and sediment and
erosion control measures in support of an approved draft plan of subdivision, associated
with a municipal building permit.
CFN: 58303 - Application #: 0873/171RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: August 8, 2017
TOWN OF RICHMOND HILL
10.7 RAKI HOLDINGS INC. C/O DG GROUP
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Lot 27, Concession
2, (10973 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as
located on the property owned by Raki Holdings Inc. c/o DG Group. The purpose is to
undertake works within a TRCA Regulated Area of the Rough River Watershed to
facilitate preliminary site alteration and grading, importing a large volume of fill, and
implement temporary stormwater management facilities and sediment and erosion
control measures in support of an approved draft plan of subdivision, associated with a
municipal building permit.
CFN: 58302 - Application #: 0872/171RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: August 8, 2017
392
TOWN OF RICHMOND HILL
10.8 RICHVIEW 19 HOLDINGS INC. C/O DG GROUP
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Lot 28, Concession
2, (11130 Bayview Avenue), in the Town of Richmond Hill, Rouge River Watershed as
located on the property owned by Richview 19 Holdings Inc. c/o DG Group. The purpose
is to undertake works within a TRCA Regulated Area of the Rough River Watershed to
facilitate preliminary site alteration and grading, importing a large volume of fill, and
implement temporary stormwater management facilities and sediment and erosion
control measures in support of an approved draft plan of subdivision, associated with a
municipal building permit.
CFN: 58301 - Application #: 0871/171RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: August 8, 2017
TERMINATION
ON MOTION, the meeting terminated at 10:23 a.m., on Friday, August 11, 2017.
Maria Augimeri
Chair
/ks
393
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #7/17 was held at TRCA Head Office, on Friday, September
8, 2017. The Vice Chair Jack Heath, called the meeting to order at 9:32 a.m.
PRESENT
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Brenda Hogg
Member
Jennifer Innis
Member
Mike Mattos
Member
Jennifer McKelvie
Member
Anthony Perruzza
Member
PRESENT VIA TELECONFERENCE
Colleen Jordan Member
ABSENT
Maria Augimeri Chair
Chris Fonseca Member
RES.#B74/17 - MINUTES
Moved by: Jack Ballinger
Seconded by: Jennifer McKelvie
THAT the Minutes of Meeting #6/17, held on August 11, 2017, be approved.
CARRIED
394
Section I — Items for Authority Action
RES.#675/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Highland Creek Watershed
Middlepark Estates Inc., CFN 55755. Acquisition of property located east of
Warden Avenue and south of Finch Avenue, municipally known as 1251
Bridletowne Circle, Scarborough, in the City of Toronto, under the
"Greenlands Acquisition Project for 2016-2020," Flood Plain and
Conservation Component, Highland Creek watershed.
Moved by: Mike Mattos
Seconded by: Jennifer Innis
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.1185 hectares (0.2928 acres), more
or less, of vacant land, located east of Warden Avenue and south of Finch Avenue, said
land being Part of Lot 32, Concession 3 (Geographical Township of Scarborough),
designated as Parts 5, 6 and 8 on Registered Plan 66R-27400, municipally known as 1251
Bridletowne Circle, Scarborough in the City of Toronto, be purchased from Middlepark
Estates Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Barry Waltman, President, Genesis Homes acting as
agent for the owner.
Access to the subject lands will be achieved through adjacent lands owned and managed by the
City of Toronto to the north and east (Timberbank Park).
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Highland Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Official Plan and Rezoning Amendment Application 12 266748 ESC 40 OZ, and
Site Plan Application 13 273809 ESC 40 SA for residential development, TRCA staff established
the limits of the open space land.
395
TAXES AND MAINTENANCE
This parcel of land will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(aDtrca.on.ca, jtruesdell(a)trca.on.ca
For Information contact: Nadia Wells, extension 5859, Jae Truesdell, extension 5247
Emails: nwells(aD_trca.on.ca, jtruesdell(aD_trca.on.ca
Date: August 23, 2017
Attachments: 1
396
Attachme t
• '
\
I
I
�.
I
Subject
Property
Tikberbank,
(Park
<
Legend
®
Toronto and Fegion
DURHAM
YORK
Conservation
(br The Living City
_ A.
�
PEEL
SITE
—
LJ
TORONTO
Saxe onrano
397
RES.#B76/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Don River Watershed
Futama Investment Corporation, CFN 58394. Acquisition of property
located south of Teston Road and west of Bathurst Street, in the City of
Vaughan, Regional Municipality of York, under the "Greenlands Acquisition
Project for 2016-2020," Flood Plain and Conservation Component, Don
River watershed.
Moved by: Mike Mattos
Seconded by: Jennifer Innis
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.08 hectares (0.2 acres), more or
less, of vacant land, located south of Teston Road and west of Bathurst Street, said land
being Part of Block 89, Registered Plan 65M-3924 and Part of Block 112, Registered Plan
65M- 3893 designated as Block 31 on draft M -Plan, prepared by Schaeffer Dzaldov Bennett
Ltd. OLS, Job No: 15-181-01C in the City of Vaughan, Regional Municipality of York, be
purchased from Futama Investment Corporation;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mr. Matthew Creador, Director of Planning &
Development, Treasure Hill, acting as agent for the owner.
Access to the subject lands will be achieved through adjacent TRCA property to the north.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Don River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the draft plan of Subdivision 19T -15V012, TRCA staff established the limits of the
open space land.
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(a)trca.on.ca, jtruesdell&trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewonq(&trca.on.ca, jtruesdell(ZDtrca.on.ca
Date: August 23, 2017
Attachments: 1
399
%I
Subject
Property. � \
x % ....
I�
Legend
CToronto and Fegion &YORK
onservation %ar The Living City _PEELL
RES.#B77/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Acquisition for the Riverhead Drive Erosion Control Project, Humber River
Watershed
47, 49, 53, 55, 57, 59, 61, 63, 65, 67 and 69 Riverhead Drive and 1 Katrine
Road, City of Toronto, CFN 51072. Acquisition of property located at 47,
49, 53, 55, 57, 59, 61, 63, 65, 67, and 69 Riverhead Drive and 1 Katrine
Road, in the City of Toronto, under the "Greenlands Acquisition Project for
2016-2020", Flood Plain and Conservation Component, Humber River
watershed.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.015 hectares (0.036 acres), more or
less, of vacant land, located at the rear of 47 Riverhead Drive, said land being Part of Lot
567, Registered Plan M-670, designated as Parts 5 and 6 on draft R -Plan by IBW
Surveyors, file name: 1-0331-R-Lots566&567 and a permanent easement of 0.002 hectares
(0.005 acres), more or less, located at the rear of 47 Riverhead Drive, said land being Part
of Lot 567, Registered Plan M-670, designated as Part 7 on draft R -Plan by IBW Surveyors,
file name: 1-0331-R-Lots566&567, City of Toronto, be purchased from Carmela Acri;
THAT 0.017 hectares (0.042 acres), more or less, of vacant land, located at the rear of 49
Riverhead Drive, said land being Part of Lot 566, Registered Plan M-670, designated as
Parts 1 and 2 on draft R -Plan by IBW Surveyors, file name: 1-0331-R-Lots566&567 and a
permanent easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 49
Riverhead Drive, said land being Part of Lot 566, Registered Plan M-670, designated as
Part 3 on draft R -Plan by IBW Surveyors, file name: 1-0331-R-Lots566&567, City of
Toronto, be purchased from Ping Xiong and Linyang Pan;
THAT 0.016 hectares (0.040 acres), more or less, of vacant land, located at the rear of 53
Riverhead Drive, said land being Part of Lot 564, Registered Plan M-670, designated as
Parts 39 and 40 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 53 Riverhead
Drive, said land being Part of Lot 564, Registered Plan M-670, designated as Part 38 on
draft R -Plan by IBW Surveyors, file name: 1-0331-110, City of Toronto, be purchased from
Rose Jevons;
THAT 0.018 hectares (0.045 acres), more or less, of vacant land, located at the rear of 55
Riverhead Drive, said land being Part of Lot 563, Registered Plan M-670, designated as
Parts 35 and 36 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 55 Riverhead
Drive, said land being Part of Lot 563, Registered Plan M-670, designated as Part 34 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
Antonio Naccarato;
401
THAT 0.016 hectares (0.039 acres), more or less, of vacant land, located at the rear of 57
Riverhead Drive, said land being Part of Lot 562, Registered Plan M-670, designated as
Parts 31 and 32 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 57 Riverhead
Drive, said land being Part of Lot 562, Registered Plan M-670, designated as Part 30 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, at the rear of 57 Riverhead Drive,
City of Toronto, be purchased from Dale Douglas;
THAT 0.011 hectares (0.030 acres), more or less, of vacant land, located at the rear 59
Riverhead Drive, said land being Part of Lot 561, Registered Plan M-670, designated as
Parts 27 and 28 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 59 Riverhead
Drive, said land being Part of Lot 561, Registered Plan M-670, designated as Part 26 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
William MacDonald;
THAT 0.006 hectares (0.016 acres), more or less, of vacant land, located at the rear 61
Riverhead Drive, said land being Part of Lot 560, Registered Plan M-670, designated as
Parts 23 and 24 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 61 Riverhead
Drive, said land being Part of Lot 560, Registered Plan M-670, designated as Part 22 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
Shirley Wilson;
THAT 0.006 hectares (0.016 acres), more or less, of vacant land, located at the rear of 63
Riverhead Drive, said land being Part of Lot 559, Registered Plan M-670, designated as
Parts 19 and 20 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 63 Riverhead
Drive, said land being Part of Lot 559, Registered Plan M-670, designated as Part 18 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
Cynthia Wan;
THAT 0.005 hectares (0.013 acres), more or less, of vacant land, located at the rear of 65
Riverhead Drive, said land being Part of Lot 558, Registered Plan M-670, designated as
Parts 15 and 16 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 65 Riverhead
Drive, said land being Part of Lot 558, Registered Plan M-670, designated as Part 14 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
Timothy Kallem and Elaine Turner;
THAT 0.007 hectares (0.017 acres), more or less, of vacant land, located at the rear of 67
Riverhead Drive, said land being Part of Lot 557, Registered Plan M-670, designated as
Parts 11 and 12 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.002 hectares (0.005 acres), more or less, located at the rear of 67 Riverhead
Drive, said land being Part of Lot 557, Registered Plan M-670, designated as Part 10 on
draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3, City of Toronto, be purchased from
Brian Attwood & Colleen Hutchinson;
402
THAT 0.008 hectares (0.020 acres), more or less, of vacant land, located at the rear 69
Riverhead Drive, said land being Part of Lot 556, Registered Plan M-670, designated as
Parts 7 and 8 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.003 hectares (0.006 acres), more or less, located at the rear of 69 Riverhead
Drive, said land being Part of Lot 556, Registered Plan M-670, designated as Part 6 on draft
R -Plan by IBW Surveyors, file name: 1-0331-110, City of Toronto, be purchased from
Susan Miller;
THAT 0.014 hectares (0.035 acres), more or less, of vacant land, located at the rear of 1
Katrine Road, said lands being Part of Lot 555, Registered Plan M-670, designated as Parts
3 and 4 on draft R -Plan by IBW Surveyors, file name: 1-0331-Rv3 and a permanent
easement of 0.004 hectares (0.009 acres), more or less, located at the rear of 1 Katrine
Road, said lands being Part of Lot 555, Registered Plan M-670, designated as Part 2 on
draft R -Plan by IBW Surveyors, file name: 1-0331-110, City of Toronto, be purchased from
Krassen Daskalov and Violina Daskalova;
THAT the purchase price for each of the parcels of land and permanent easements at 47,
49, 53, 55, 57, 59, 61, 63, 65, 67, and 69 Riverhead Drive and 1 Katrine Road be each $2.00
in addition to each vendor's reasonable legal costs, and survey if required, be paid by
TRCA;
THAT TRCA receive conveyance of the lands at 47, 49, 53, 55, 57, 59, 61, 63, 65, 67, and 69
Riverhead Drive and 1 Katrine Road free from encumbrance, subject to existing service
easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Following initial review by TRCA inspectors of the damage from the July 8, 2013 storm, 27 sites
were recommended for preliminary slope stability and erosion risk assessments by a third party
engineering firm, which was completed by Terraprobe Inc. Following these preliminary
geotechnical reviews, 24 properties which included at 47, 49, 51, 53, 55, 57, 59, 61, 63, 65, 67,
and 69 Riverhead Drive and 1 Katrine Road were recommended for detailed geotechnical
assessments, which were also completed by Terraprobe.
As the detailed geotechnical assessments for at 47, 49, 51, 53, 55, 57, 59, 61, 63, 65, 67, and 69
Riverhead Drive and 1 Katrine Road confirmed long-term impact to the dwellings, the approved
2014 to 2016 work plans included the implementation of erosion control works at these properties,
subject to approval from the City of Toronto and confirmation of available funding.
403
The works at 47, 49, 53, 55, 57, 59, 61, 63, 65, 67, and 69 Riverhead Drive and 1 Katrine Road
were completed in fall of 2016 and included erosion control design development and
implementation, negotiation of erosion agreements, fence installation and restoration plantings.
The TRCA funding policy for works carried out on private lands stipulates that benefiting
landowners are required to contribute to the cost of the project, either financially, or through the
transfer of lands. The owners at 47, 49, 53, 55, 57, 59, 61, 63, 65, 67, and 69 Riverhead Drive and
1 Katrine Road have agreed to convey lands and permanent easements to TRCA as their
contribution toward the costs of the project. 51 Riverhead Drive decided not to participate in the
project as they did not want to contribute to the cost of the project as per the TRCA funding policy.
Letters were sent to owner at 51 Riverhead Drive on September 5, 2014 and June 13, 2016
confirming exclusion in the project. The erosion control design was developed around 51
Riverhead Drive with a mechanically stabilized earth wall to the north of 51 Riverhead Drive and
buttress to the south.
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject properties are required for the construction of the Riverhead Drive Erosion Control
Project.
TAXES AND MAINTENANCE
The lands proposed to be acquired at 47, 49, 53, 55, 57, 59, 61, 63, 65, 67, and 69 Riverhead
Drive and 1 Katrine Road will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA erosion account.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewonq(ZDtrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(rDtrca.on.ca, itruesdell(cUrca.on.ca
Date: August 23, 2017
Attachments: 1
A l A
Attachment 1
m
er
`
Subject
/
Property '
er
ane t
/
Ea s
me t
RIVERHEAo
DR
w
U
J
J
LU
eARFpR�
m
RD
Legend
Torantoand Region
YORK
DURHAM
Conservation
f
for The Living City
_
PEEL
L J
1
SITE
TORONTO
t:x. o�tana
405
RES.#B78/17 - NAMING OF TORONTO AND REGION CONSERVATION AUTHORITY
ASSET
Approval to name a Toronto and Region Conservation Authority property in
the Town of Caledon, Regional Municipality of Peel, as The Douglas J.
Reddington Conservation Reserve.
Moved by: Mike Mattos
Seconded by: Jennifer Innis
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 10.21 hectares (25.24 acres) of
Toronto and Region Conservation Authority (TRCA) owned land in the Town of Caledon,
as illustrated in Attachment 1, be officially named "The Douglas J. Reddington
Conservation Reserve";
THAT the Town of Caledon be so advised;
AND FURTHER THAT TRCA staff be directed to erect a sign designating the property as
The Douglas J. Reddington Conservation Reserve.
CARRIED
BACKGROUND
At Meeting #10/15, held on November 27, 2015, the Authority adopted Resolution #A236/15,
directing staff to accept a donation of land from Douglas J. Reddington; subsequently, the
property was transferred to TRCA on March 23, 2017.
The subject TRCA-owned lands are located west of Regional Road 50 and north of Patterson
Sideroad, in the hamlet of Palgrave, Town of Caledon. TRCA staff was approached by Mr.
Douglas Reddington regarding the donation of 10.21 hectares (25.24 acres), more or less, of
ecologically sensitive land. The donation was processed through the Ecological Gifts Program
administered by Environment Canada.
The former Reddington property is part of a large natural area with high biodiversity of species
and vegetation communities. The property is located within the Greenbelt Plan Area and is
considered a Natural Core Area under the Oak Ridges Moraine Conservation Plan. The property
forms part of the Palgrave Cedar Forest Environmentally Significant Area (ESA) which consists of
a large natural area with high biodiversity and is rich in rare flora/fauna species as well as rare
vegetation communities. This ESA is connected to the Simcoe-Albion Forest ESA located to the
north which functions as a continuous corridor to the headwaters of the Humber River. A tributary
of the Humber River also flows through the property which supports both warm and cold water
aquatic communities. The lands are classified as Existing Natural Cover according to TRCA's
Terrestrial Natural Heritage System Strategy. There is also a wetland on site that has yet to be
evaluated by the Ministry of Natural Resources and Forestry.
The acquisition of this property has provided a vital linkage between existing TRCA lands to the
north and south. Ownership of the property will ensure long term protection of the ESA as well as
help to protect the natural heritage features and the sensitive flora and fauna communities. In
addition, TRCA's ownership of the property allows for more effective floodplain management as
well as long term ecological management and enhancement of the communities the site supports,
which is of limited representation within the TRCA watersheds.
91 e
At Authority Meeting #9/03, held on November 28, 2003, Resolution #A255/03 was approved,
which set the protocol for the naming of TRCA assets. In accordance with the protocol, a naming
may contain any or all of the following:
The name of a major individual or corporate/public sector organization;
The name of an individual prominent in the environmental or conservation community;
A relevant historical name associated with the geographic area or community;
The name of a strategic initiative, a citizen's group or other partnership of TRCA; and/or
Other names that may have significance for a specific site and area.
The donor has agreed with TRCA's staff recommendation to name the property "The Douglas J.
Reddington Conservation Reserve".
Mr. Reddington is a planner by profession and has spent his entire career in municipal planning,
which has included the preservation of conversation lands. His passion for municipal planning
and conservation transcends almost seven decades and has centred around the Region of Peel.
Mr. Reddington was the founding Chairman of the Credit Valley Conservation Authority in 1954
and was one of the founding board members of the Metropolitan Toronto and Region
Conservation Authority at its first meeting in 1957.
Mr. Reddington's lifelong passion for natural heritage preservation truly exemplifies the spirit of
conservation which follows in the footsteps with past visionaries such as Charles Sauriol.
DETAILS OF WORK TO BE DONE
Staff will produce and install an appropriate sign at a conspicuous location on the land to identify
the property's name, history and acknowledging the generous donation to TRCA. A
commemorative event for the sign unveiling is being planned for later this fall.
FINANCIAL DETAILS
The estimated cost of producing and installing the sign on the property is $2,000. This expense
will be covered by TRCA's capital budget with funding from Peel Region.
Report prepared by: George Leja, extension 5342
Emails: gleia(aDtrca.on.ca
For Information contact: George Leja, extension 5342, Jae R. Truesdell, extension 5247
Emails: gleiat7D_trca.on.ca, itruesdell(cDtrca.on.ca
Date: August 18, 2017
Attachment: 1
407
Attachment 1
V_-� --�
t�
Legend
® Toronto and Region*PEEL
Conservation
ity,,for The Living City-
......
,,
COMMITTEE OF THE WHOLE
RES.#B79/17
Moved by: Jennifer Innis
Seconded by: Brenda Hogg
THAT the Committee move into closed session to discuss item 7.5 — Toronto Wildlife
Centre as it pertains to on-going property negotiations.
CARRIED
RISE AND REPORT
RES.#1380/17
Moved by: Anthony Perruzza
Seconded by: Jack Ballinger
THAT the Committee rise and report from closed session.
CARRIED
RES.#B81/17 - TORONTO WILDLIFE CENTRE
Fundraising, Governance and Ownership. Update on the proposal by
Toronto Wildlife Centre to build and operate a wildlife rescue, rehabilitation
and education centre in the Rouge National Urban Park.
Moved by: Mike Mattos
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT staff report back to the Executive
Committee at a future date on municipal funding support for the Toronto Wildlife Centre's
proposal and lease for a new wildlife rescue, rehabilitation and education centre in the
Rouge National Urban.
CARRIED
BACKGROUND
At Authority Meeting #4/17, held on May 19, 2017, amended Resolution #A81/17 in regard to
Toronto Wildlife Centre was approved as follows:
THAT Toronto and Region Conservation Authority re -confirm its support of the proposal
by Toronto Wildlife Centre (TWC) for a wildlife rescue, rehabilitation and education centre
(Centre) for the Greater Toronto Area in the Rouge National Urban Park;
THAT staff approach the City of Toronto and the Regions of Durham, Peel and York to
explore new funding support for the construction of the Centre based upon the design
developed by Stanford Downey Architects Inc.;
THAT staff work with the TWC to explore funding for the Centre from the federal and
provincial governments, and other potential partners;
AND FURTHER THAT staff report back to the Executive Committee at the September
meeting on funding support for the Centre, a draft fundraising plan, the governance model,
lease and ownership of land arrangements, prior to signing the lease.
Fundraising Plan
Since first opening in 1993, Toronto Wildlife Centre (TWC)'s fundraising capabilities have grown
along with its programs despite having only a small development team. From its beginnings with
modest fundraising revenue of $8,000 in 1993, TWC raised almost $1.6 million in 2016 and is on
track to raise over $2 million in 2017 for the operation of its programs and facility. Individual
donors make up the majority of TWC's fundraising base, with approximately 7,000 active donors
(i.e. donors who have supported the Centre within the last three years). Almost 1,000 donors are
monthly supporters and this reliable long-term revenue stream continues to grow.
TWC currently has over 500 active volunteers and receives regular in-kind donations of goods
and services. This in-kind support allows the Centre to invest funds into additional services for the
community.
Fundraising consultants KCI Ketchum (KCI) were hired to do an internal fundraising review and
assess the feasibility of raising $12 million cash and $3 million in-kind for a new facility. TWC's
donor list and fundraising history were closely analyzed and stakeholder interviews were carried
out. KCI concluded that TWC had "strong major gift potential within the centre's current and past
supporters' and it had good donor retention and renewal rates. Interview results were very
positive.
With KCI's assistance, TWC created a comprehensive donor prospect list, Case for Support and
other supporting documents. Additional staff was hired to assist with the capital campaign,
including a capital campaign manager. Also in anticipation of the capital campaign, TWC's
board of directors has increased its membership. Potential leadership volunteers with personal
capacity to support TWC have been identified and approached, and several are already at work
on the campaign.
Once 50-75% of the campaign goal is reached, hopefully by the spring of 2018, the campaign will
go public to raise the rest of the funds from both TWC supporters and the community. Planning
is underway for a mini -campaign that targets a specific sector of the community with anticipated
revenue of $500,000 to $1 million. This mini -campaign will be led by a local celebrity who has
already confirmed involvement.
Funding Support to Date
Several leadership gifts to the campaign have already been confirmed. Two family foundations
have each confirmed gifts of $1 million, and both are considering increasing their support to $2
million. A third family foundation has confirmed another $1 million gift and in February of 2017 the
City of Toronto approved a contribution of $750,000 towards the campaign. In addition, several
smaller donations ranging from $5,000 to $50,000 have been received.
In-kind support has been very strong so far, with almost 30 companies confirming donations of
their services for the planning stages of the project. Stanford Downey Architects, the project
leaders, have committed $1.2 million in donated professional services to date.
Cash Donations
$3.82 million confirmed to date;
$2 million in additional funds currently under consideration;
several other proposals in progress (with initial meetings completed);
many other prospects have been identified amongst TWC's current supporters;
planning in progress for the public phase, including a targeted campaign to raise $500,000
to $1million.
410
In-kind Donations
$2-3 million in in-kind donations of professional services have already been secured;
additional initial meetings/conversations have taken place and support will be confirmed
once we enter the detailed design phase;
many other prospects have been identified amongst TWC's current supporters.
Governance Model
TWC currently has nine board members and they serve three year terms on the board. The TWC
board has considered the proposal for a Toronto and Region Conservation Authority (TRCA)
representative and is supportive. The appointment would take place once the funding
arrangement has been finalized.
Lease and Ownership
Currently the subject property is part of the approximately 5,600 acres of TRCA-owned land
included in a Memorandum of Agreement Respecting the Assembly of Lands for the Proposed
Rouge National Urban Park. The lands are scheduled for transfer in the latter part of 2017 or early
2018. Staff is recommending that TRCA proceed with the transfer of this parcel of land to Parks
Canada. Parks Canada has indicated a willingness to enter into a tripartite lease with TWC and
TRCA for the operation of the facility. While TWC would be exclusively responsible for its
operations, TRCA would have control over the use of the facility, capital improvements, major
maintenance and input into the use of the maintenance reserve/endowment fund.
Other Updates
Staff has had preliminary discussions with finance staff from the City of Toronto and regions of
Durham, Peel and York, following notification to each municipality of TRCA's support for the
project. Municipal finance staff is waiting for additional details about the facility and the operation
before more detailed discussions about funding of this facility can proceed. Further, TWC has
approached senior levels of government for funding support and will continue to pursue
opportunities.
The main outstanding design issue that must be resolved prior to finalizing the design of the
facility is water supply. Staff has begun preliminary investigations into the use of well(s) to service
the site as an interim solution until such time as the site is serviced by municipal water either from
the City of Toronto or the Region of York. Based on staff's preliminary assessment, this interim
option is feasible. TWC has recently confirmed that Cole Engineering has agreed to provide
in-kind services to develop this option more fully. As the plan for the facility was developed a
number of years ago, TWC is re -assessing the design of the facility to ensure it will continue to
meet its long term needs.
TWC has indicated that the condition of its current facility at Parc Downsview Park is deteriorating
rapidly and may be uninhabitable prior to the new facility being completed. TWC is investigating
the possibility of a temporary facility on the new site to house its operation prior to completion of
the new facility.
Report prepared by: Mike Ferning, extension 5223
Emails: mfenning(&trca.on.ca
For Information contact: Mike Fenning, extension 5223
Emails: mfenning(a@trca.on.ca
Date: August 24, 2017
411
Section II — Items for Executive Action
RES.#B82/17 - DON VALLEY DRIVE AND HILLSIDE DRIVE SLOPE STABILITY
ANALYSIS AND EROSION RISK ASSESSMENT, CITY OF TORONTO
Contract #10004614. Award of Contract #10004614 for completion of a
slope stability analysis and erosion risk assessment along public and
private properties located along Don Valley Drive and Hillside Drive in the
City of Toronto.
Moved by: Brenda Hogg
Seconded by: Glenn De Baeremaeker
THAT Contract #10004614 be awarded to Terraprobe Inc. for completion of a slope
stability analysis and erosion risk assessment along public and private properties located
along Don Valley Drive and Hillside Drive in the City of Toronto, at a total cost not to
exceed $162,020.00, plus a 10% contingency, plus HST as they provided the
highest -ranked proposal based on a public bid opportunity;
AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA)
officials be directed to take any action necessary to implement the agreement including
obtaining any required approvals and the signing and execution of documents.
CARRIED
BACKGROUND
TRCA monitors a concrete and gabion basket retaining wall (Structure ID DR58.1) that was built
near the crest of the valley slope on the north side of Don Valley Drive in 1978. Yearly inspections
of the retaining wall between 2006 and 2016 have shown signs of increasing instability.
Additionally, a slope failure measuring 45.3 metres in length and located immediately southwest
of DR58.1 was identified by TRCA Erosion Management staff during the 2016 annual inspection.
The crest of this slope failure is located two metres away from Don Valley Drive. This has
prompted the need for a detailed geotechnical investigation.
The primary study area is located along the north side of Don Valley Drive which is designated as
greenspace owned by TRCA at the property municipally known as 60 Don Valley Drive in the City
of Toronto. During the collection and review of baseline information, TRCA staff noticed that there
were several private properties in the vicinity of 60 Don Valley Drive that feature dwellings located
in close proximity to the slope crest and a steep slope face. TRCA staff decided to expand the
primary study area to include these additional properties which are located along 62 to 68 Don
Valley Drive and 70 to 84 Hillside Drive as part of its proactive erosion risk management
objectives.
Additional private properties were identified along 21 to 45 Don Valley Drive and 38 to 50 Hillside
Drive as having slope inclinations that are steeper than 3H:1 V. These properties were identified
as potential candidates for Preliminary Visual Assessment (PVA) by a geotechnical engineer.
TRCA staff issued cover letters to the identified private properties explaining TRCA's intent to
commence a study and requested their voluntary participation through submission of a signed
Permission to Enter (PTE) agreement. The study area map is Attachment 1.
As of the date of this report, the following private properties have opted -into the primary study
area by returning signed PTE agreements to TRCA and will be included in the full scope of the
study:
412
66 Don Valley Drive
72 Hillside Drive
74 Hillside Drive
82 Hillside Drive
84 Hillside Drive
The following properties opted -into the secondary study area will have a PVA report completed for
their property as part of this contract:
42 Hillside Drive
48 Hillside Drive
50 Hillside Drive
RATIONALE
The geotechnical component outlined in the Request for Proposal (RFP) prepared by TRCA
requires a subsurface borehole investigation program to help inform delineation of the long term
stable slope crest (LTSCC) position and any associated hazards threatening public and private
structures and infrastructure within the identified study area.
A structural engineering inspection of TRCA's concrete and gabion basket retaining wall structure
(DR58.1) is also being requested in order to determine its condition and appropriate maintenance
options, as required.
The scope of work also includes an investigation into the condition and capacity of local
stormwater management systems as well as surface drainage patterns. This will help determine if
surface runoff or deficiencies related to stormwater sewer infrastructure may be contributing to
observed erosion and slope failures in the study area.
Conceptual design alternatives will also be prepared as part of this contract to determine viable
remedial options for the study area once the study is complete.
RFP #10004614 was publicly advertised on Biddingo.com on July 14, 2017 and a total of 17
companies downloaded the full document set. RFP #10004614 closed at TRCA's Head Office
location on August 3, 2017 and proposal packages were received from GHD Inc. and Terraprobe
Inc. by the stipulated deadline.
The proposals were opened by a proposal opening committee on August 3, 2017 shortly after the
deadline. The financial proposals were resealed and technical proposals were reviewed and
ranked by a separate proposal ranking committee comprised of TRCA engineers and project
management staff. Once the review and scoring of technical proposals was completed, the
financial proposals were opened by the proposal ranking committee and financial information was
factored into the overall scoring results shown in the table below.
413
Contract # 10004614 Proposal Ranking Results
While both GHD and Terraprobe provided strong proposals. Terraprobe demonstrated a better
understanding of the scope of work and challenges associated with the site with respect to the
proposed borehole investigation program.
Terraprobe recommended additional chemical analysis of extracted soil samples to help inform
soil disposal options that may be required as part of any future remedial work. Furthermore,
Terraprobe also recommended advancing test pits to determine the current condition of the
tie -back system for the concrete retaining wall structure which would inform maintenance options.
These additional items recommended by Terraprobe Inc. amount to $10,800.00 plus HST and are
reflected in the Total Contract Amount.
TRCA staff also recommends that a provisional allowance of $33,600.00 be carried to allow
additional private properties into the primary study area should they wish to opt -into the study
before Terraprobe Inc. mobilizes to initiate the investigation.
TRCA staff recommends that Contract #10004614 be awarded to Terraprobe Inc. at a total cost
not to exceed $162,020.00, plus a 10% contingency to be expended as authorized by TRCA
officials, plus HST as they submitted the highest -ranked proposal.
This project aligns with Leadership Strategy #2 which is to'manage our regional water resources
for current and future generations'. By gaining further insight into potential slope instability, local
stormwater management systems, and existing surface runoff patterns, TRCA will better
understand the underlying causes of observed erosion and slope failures throughout the study
area. The results of this study will help inform appropriate remedial measures to be undertaken as
part of any future work recommended for this area.
FINANCIAL DETAILS
The total budget for this project is $250,000 which includes staff time and other costs incurred to
date such as topographic surveying. Funding for this contract is provided by the City of Toronto
from the annual capital Shoreline Maintenance and Monitoring Account (#139-01) and annual
capital Erosion Major Maintenance Account (#134-01).
414
Proponent
Scoring Criteria
GHD Inc.
Terraprobe Inc.
1. Conformance with the Terms of the RFP out of 10%
10.00%
10.00%
2.Understanding of Project and Scope of Work out of 15%
12.25%
14.75%
3.Similar Projects — Scope and Magnitude out of 10%
7.50%
10.00%
4. Approach and Methodology out of 35%
29.58%
33.78%
5. Expertise and availability of Project Team out of 15%
14.48%
15.00%
6. Reasonableness of Cost (out of 15% and based on the
Total Contract Amount
15.00%
13.81%
7. Total Score out of 100%nanH
88.81%
97.34%
Base contract amount excl. HST$135,000.00
$112,820.00
Additional items recommended b the Consul
N/A
$10,800.00
Provisional cost to include additional propertie
stud area excl. HSTProvisional
$6,700.00
$33,600.00
cost to complete PVA reports for
Hillside Drive excl. HSTTotal
$7,500.00
$4,800.00
Contract Amount excl. 10% contin e$149,200.00
$162,020.00
While both GHD and Terraprobe provided strong proposals. Terraprobe demonstrated a better
understanding of the scope of work and challenges associated with the site with respect to the
proposed borehole investigation program.
Terraprobe recommended additional chemical analysis of extracted soil samples to help inform
soil disposal options that may be required as part of any future remedial work. Furthermore,
Terraprobe also recommended advancing test pits to determine the current condition of the
tie -back system for the concrete retaining wall structure which would inform maintenance options.
These additional items recommended by Terraprobe Inc. amount to $10,800.00 plus HST and are
reflected in the Total Contract Amount.
TRCA staff also recommends that a provisional allowance of $33,600.00 be carried to allow
additional private properties into the primary study area should they wish to opt -into the study
before Terraprobe Inc. mobilizes to initiate the investigation.
TRCA staff recommends that Contract #10004614 be awarded to Terraprobe Inc. at a total cost
not to exceed $162,020.00, plus a 10% contingency to be expended as authorized by TRCA
officials, plus HST as they submitted the highest -ranked proposal.
This project aligns with Leadership Strategy #2 which is to'manage our regional water resources
for current and future generations'. By gaining further insight into potential slope instability, local
stormwater management systems, and existing surface runoff patterns, TRCA will better
understand the underlying causes of observed erosion and slope failures throughout the study
area. The results of this study will help inform appropriate remedial measures to be undertaken as
part of any future work recommended for this area.
FINANCIAL DETAILS
The total budget for this project is $250,000 which includes staff time and other costs incurred to
date such as topographic surveying. Funding for this contract is provided by the City of Toronto
from the annual capital Shoreline Maintenance and Monitoring Account (#139-01) and annual
capital Erosion Major Maintenance Account (#134-01).
414
DETAILS OF WORK TO BE DONE
TRCA staff will be issuing final notices to private homeowners that have not responded to TRCA's
initial request to have their properties included in the primary study area. These private
homeowners will be given a final opportunity to opt -into the study prior to awarding Contract
#10004614 to Terraprobe Inc.
Report prepared by: Ashour Rehana, 647-808-6542
Emails: arehana(a)trca.on.ca
For Information contact: Ashour Rehana, 647-808-6542
Emails: arehana(cDtrca.on.ca
Date: August 18, 2017
Attachments: 1
415
Attachment 1 Study Limits
_ _ ... �. - _- ___ ma.....rr eaxw rr n. rr."rar tir."s.x er.rr.n e...u. i��umr. ""T `�_• � �m/�����
r..�..�._ �.. �, -. a. -tea .: .....-..r.r..w rr r... mr wr.:rua n. r+sws�s sa.ua+:✓ar�es: 4 � - 4V�eP SPY:
o.•a.. 'i ibr'BsdM�Ob
Section IV — Ontario Regulation 166/06, As Amended
RES.#683/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Jack Ballinger
Seconded by: Jennifer McKelvie
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.4 and 10.6 which are listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.4 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF BRAMPTON
10.1 8 EMANUELE PLACE
To construct, reconstruct, erect or place a building or structure on Lot 6, Plan 43M-
1341, 8 Emanuele Place, in the City of Brampton, Humber River Watershed.
The purpose is to recognize the construction of a 6 m by 6 m (19.7 ft by 19.7 ft) shed
located at the rear of an existing dwelling within TRCA's Regulated Area of the
Humber River Watershed. The described works were initiated without the issuance
of a TRCA or municipal building permit. As such, an additional permit application fee
of 100% was charged for this "after -the -fact" permit.
CFN: 58174 - Application #: 0787/17/13RAM
Report Prepared by: Andrea Terella 5657 andrea.terella@trca.on.ca
For information contact: Andrea Terella 5657 and rea.terella@trca.on.ca
Date: August 28, 2017
417
CITY OF VAUGHAN
10.2 42 BRODA DRIVE
To change a building or structure so that it alters its use or potential use, increases
its size or increases the number of dwelling units on Lot 6, Plan 4005, (42 Broda
Drive), in the City of Vaughan, Humber River Watershed. The purpose is to
undertake works within a Regulated Area of the Humber River Watershed in order to
facilitate a 130.33 sq.m. (1,402.82 sq.ft) second storey addition to the single -storey
dwelling located at a property municipally known as 42 Broda Drive in the City of
Vaughan.
CFN: 57705 - Application #: 0405/17NAUG
Report Prepared by: Polina Barn 5256 polina.bam@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: August 16, 2017
CITY OF VAUGHAN
10.3 ROYBRIDGE HOLDINGS LIMITED
To construct, reconstruct, erect or place a building or structure, interfere with a
wetland and alter a watercourse on Part Lot 24, 25, Concession 7, (10460 and
10640 Pine Valley Drive, Vaughan), in the City of Vaughan, Humber River
Watershed as located on the property owned by Roybridge Holdings Limited. The
purpose is to construct a Stormwater Management Pond within an area regulated
under Ontario Regulation 166/06 on Part of Lots 24 & 25, Concession 7, in the City
of Vaughan, Humber River Watershed as located on the property owned by
Roybridge Holdings Limited.
CFN: 57642 - Application #: 0385/17/VAUG
Report Prepared by: Jackie Burkart 5304jburkart@trca.on.ca
For information contact: Jackie Burkart 5304jburkart@trca.on.ca
Date: August 29, 2017
CITY OF VAUGHAN
10.4 ROYBRIDGE HOLDINGS LIMITED
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Part Lot 24, 25,
Concession 7, (Pine Valley Drive and Teston Road), in the City of Vaughan, Humber
River Watershed as located on the property owned by Pine Valley Drive and Teston
Road. The purpose is to facilitate within TRCA's Regulated Area of Humber River
Watershed, the creation of 1,052 sq. m (11323.63 sq. ft) of wetland and 298 m
(977.7 ft) of channel habitat (no heavy equipment use permitted in the undertaking)
to improve redside Dace habitat, on lands located west of Pine Valley Drive and
south of Teston Road, in the City of Vaughan.
CFN: 57881 - Application #: 0582/17/VAUG
Report Prepared by: Jackie Burkart 5304 jburkart@trca.on.ca
For information contact: Jackie Burkart 5304 jburkart@trca.on.ca
Date: August 29, 2017
i
RES.#B84/17 - STANDARD DELEGATED PERMITS
Moved by: Jack Ballinger
Seconded by: Jennifer McKelvie
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.5 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF BRAMPTON
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to install a SWM Shield and new outlet control structure in order to improve
stormwater quality control treatment, and maintenance ease and efficacy at an existing
stormwater management facility at the south west corner of Heart Lake Road and Mayfield
Road, in the City of Brampton.
CFN: 58280 - Application #: 0880/171BRAM
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: August 11, 2017
CITY OF MARKHAM
CITY OF MARKHAM - Don River Watershed
The purpose is to undertake emergency works for a failed concrete box culvert that has moved
into a watercourse located south of Proctor Avenue, east of Henderson Avenue, at Proctor
Park, in the City of Markham. The emergency works include placing bedding material at the
location of the failed culvert and a process to reassemble the existing culvert as per original
design. This permit is in accordance with TRCA Permission for Emergency Works Review
Protocol approved by Authority Res. #A105/15.
CFN: 57961 - Application #: 0729/17/1VIARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Suzanne Bevan, extension 5759, email sbevan@trca.on.ca
Date: July 17, 2017
419
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed in order to facilitate the construction of an elevated wooden deck, site improvements
and a new parking lot at the historic Stiver Mill.
CFN: 58171 - Application #: 0968/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: August 16, 2017
7325 MARKHAM ROAD - Rouge River Watershed
The purpose is to undertake site grading, temporarily or permanently place materials originating
from the site or elsewhere, establish sediment and erosion controls, and construct an 8 storey,
181 residential unit condominium building with underground parking, in support of Phase 2 of a
municipally approved site plan in the City of Markham.
CFN: 58297 - Application #: 0875/17/MARK
Report Prepared by: Doris Cheng, extension 5306, email dcheng@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: July 26, 2017
HIGH PARK PLAZA LIMITED - Rouge River Watershed
The purpose is to undertake site alteration and grading works to construct an outfall and
temporary drainage channel to direct flows from an approved stormwater management pond to
Berczy Creek, in support of two approved draft plan of subdivision (19TM-13002 and 19TM-
14008).
CFN: 58294 - Application #: 0869/17/MARK
Report Prepared by: Doris Cheng, extension 5306, email dcheng@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: August 15, 2017
95 FRED VARLEY DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a second -storey addition to the existing
dwelling.
CFN: 58346 - Application #: 0913/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: August 3, 2017
420
CITY OF MISSISSAUGA
AZURIA GROUP - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate repairs to an existing underground parking garage and re -
asphalt the existing parking lot associated with a municipal building permit application.
CFN: 58396 - Application #: 0932/17/MISS
Report Prepared by: Adam Miller, extension 5244, email amiller@trca.on.ca
For information contact: Adam Miller, extension 5244, email amiller@trca.on.ca
Date: August 29, 2017
7130 JUSTINE DRIVE - Mimico Creek Watershed
The purpose is to undertake works within a TRCA's Regulated Area of the Mimico Creek
Watershed in order to facilitate the construction of a 98 sq. m (1, 052.8 sq. ft.) second storey
addition to an existing residential dwelling, and a 4.7 sq. m (50.5 sq. ft.) porch with second
storey balcony located at the front of the dwelling, associated with a municipal building permit.
CFN: 58213 - Application #: 0803/17/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 15, 2017
4424 PALISADES LANE - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 4.9 m (16 ft) by 12.2 m (40 ft) in -ground
pool and patio associated with a municipal building permit.
CFN: 58104 - Application #: 0722/171MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 10, 2017
MANTELLA CORPORATION - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the removal of sod and landscaped area, and re -grade the site
to allow for outdoor storage of tractor trailers associated with a municipal building permit and
municipal site plan application (City File No. SP 17-71 W5).
CFN: 58236 - Application #: 0836/17/MISS
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 24, 2017
421
1660 LINCOLNSHIRE BOULEVARD - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 51.93 sq. m. (559 sq. ft.) one storey
addition to the front the existing dwelling and a 6.91 sq. m. (74.4 sq. ft.) addition to the existing
wood deck at the rear yard of the property associated with a municipal building permit.
CFN: 58183 - Application #: 0792/171MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 10, 2017
CITY OF PICKERING
3305 HOLLYWOOD COURT - Carruthers Creek Watershed
The purpose is to construct an inground pool with associated hardscaping to the rear of the
existing single family detached dwelling located at 3305 Hollywood Court in the City of
Pickering.
CFN: 58115 - Application #: 0748/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 22, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
6965083 CANADA INC. O/A ALTAIR APTS. - Humber River Watershed
The purpose is to construct 3 free standing signs on a high density residential lot municipally
described as 15 Martha Eaton Way in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 58137 - Application #: 0820/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 2, 2017
46 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a new three storey single family detached dwelling at 46 Cynthia
Road in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling
and detached garage are to be demolished.
CFN: 56699 - Application #: 1011/16/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 16, 2017
422
51 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a second storey addition and rear deck to the existing single family
detached dwelling at 51 Cynthia Road in the City of Toronto (Etobicoke York).
CFN: 58343 - Application #: 0922/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 14, 2017
59 RIDGE POINT CRESCENT - Humber River Watershed
The purpose is to construct a two storey single family dwelling with rear deck at 59 Ridge Point
Crescent in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57422 - Application #: 0183/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 2, 2017
115 MERCURY ROAD - Humber River Watershed
The purpose is to construct a second storey addition and rear deck to the existing single family
dwelling at 115 Mercury Road in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58244 - Application #: 0839/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
1 MOSSOM PLACE - Humber River Watershed
The purpose is to construct a small deck, a stair to the existing rear patio, and re-lay the existing
flagstone at 1 Mossom Place in the City of Toronto (Etobicoke York).
CFN: 57507 - Application #: 0295/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 17, 2017
3 ROSALIE AVENUE - Humber River Watershed
The purpose is to construct an integral garage and second storey addition to the existing one
storey single family dwelling at 3 Rosalie Avenue in the City of Toronto (Etobicoke York
Community Council Area).
CFN: 57598 - Application #: 0356/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 25, 2017
423
46 RAVENSCREST DRIVE - Mimico Creek Watershed
The purpose is to construct an in -ground pool, pool equipment storage shed, and associated
hardscaping in the rear/side yard of the existing detached dwelling at 46 Ravenscrest Drive in
the City of Toronto (Etobicoke York).
CFN: 58079 - Application #: 0705/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 3, 2017
TORONTO TRANSIT COMMISSION - Humber River Watershed
The purpose is to undertake retrofits to Humber Loop platform. No in -water work is within the
scope of this project.
CFN: 56911 - Application #: 0506/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 11, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
26 CEDARBANK CRESCENT - Don River Watershed
The purpose is to demolish an existing one storey single family detached dwelling and construct
a two storey single family detached dwelling located at 26 Cedarbank Crescent in the City of
Toronto (North York Community Council Area).
CFN: 58185 - Application #: 0796/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 17, 2017
154 THREE VALLEYS DRIVE - Don River Watershed
The purpose is to construct a second storey addition and replacement deck to the rear of an
existing one and a half storey single family semi-detached dwelling located at 154 Three Valleys
Drive in the City of Toronto (North York Community Council Area).
CFN: 58126 - Application #: 0795/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 18, 2017
66 FOREST GROVE DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling at 66 Forest Grove Drive in the
City of Toronto (North York Community Council Area).
424
CFN: 57365 - Application #: 0140/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 16, 2017
23 TIMBERLANE DRIVE - Don River Watershed
The purpose is to construct a garage extension to the front of the existing one storey single
family dwelling at 23 Timberlane Drive in the City of Toronto (North York Community Council
Area).
CFN: 57812 - Application #: 0516/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
99 DONWOODS DRIVE - Don River Watershed
The purpose is to construct a deck, porch enclosure, hot tub and pool to the rear of the existing
dwelling at 99 Donwoods Drive in the City of Toronto (North York Community Council Area).
CFN: 57466 - Application #: 0237/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 21, 2017
5 MYLESVIEW PLACE - Don River Watershed
The purpose is to construct a two storey single family dwelling at 5 Mylesview Place in the City
of Toronto (North York Community Council Area).
CFN: 57813 - Application #: 0486/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 10, 2017
99 BANSTOCK DRIVE - Don River Watershed
The purpose is to construct a second storey addition within the existing footprint of a single
storey single family detached dwelling located at 99 Banstock Drive in the City of Toronto (North
York Community Council Area).
CFN: 58075 - Application #: 0711/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 3, 2017
425
19 CITATION DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling and rear deck at 19 Citation
Drive in the City of Toronto (North York Community Council Area).
CFN: 57702 - Application #: 0394/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 17, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
21 FALLINGBROOK WOODS - Waterfront Watershed
The purpose is to construct a two car garage to the front of the existing dwelling at 21
Fallingbrook Woods in the City of Toronto (Scarborough Community Council Area).
CFN: 54463 - Application #: 0776/151TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 16, 2017
CITY OF TORONTO - Waterfront Watershed
The purpose is to repair a failed storm sewer outfall. Works will involve repair to failed
infrastructure. This permit was issued in accordance with TRCA's Permission for Emergency
Infrastructure Works Review Protocol (Authority Res. #A105/15). No in -water works are within
the scope of this project.
CFN: 57798 - Application #: 0831/171TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: August 2, 2017
95 MAYWOOD PARK - Don River Watershed
The purpose is to construct a new covered deck in the eastern portion of the rear yard of an
existing single family detached dwelling located at 95 Maywood Park in the City of Toronto
(Scarborough Community Council Area).
CFN: 58267 - Application #: 0838/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 14, 2017
19 TARDREE PLACE - Don River Watershed
The purpose is to construct a new dwelling unit within the existing footprint, a one storey
addition, and an attached deck to the rear of an existing one and a half storey single family
detached dwelling located at 19 Tardree Place in the City of Toronto (Scarborough Community
Council Area).
426
CFN: 58373 - Application #: 0927/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 28, 2017
TORONTO CATHOLIC DISTRICT SCHOOL BOARD - Highland Creek Watershed
The purpose is to place two new classroom portables at St. John Paul II Catholic Secondary
School (685 Military Trail) in the City of Toronto (Scarborough Community Council Area).
CFN: 58317 - Application #: 0911/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 8, 2017
60 CHINE DRIVE - Don River Watershed
The purpose is to construct a one storey three season sunroom and attached deck to the rear of
an existing two storey single family detached dwelling located at 60 Chine Drive in the City of
Toronto (Scarborough Community Council Area).
CFN: 58107 - Application M 0744/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
77 & 79 EDR INC. - Don River Watershed
The purpose is to construct a multi-storey mixed use commercial and residential building, a
driveway access and grade.
CFN: 58025 - Application #: 0673/171TOR
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: June 7, 2017
95 THURSFIELD CRESCENT - Don River Watershed
The purpose is to construct a second -storey addition over the existing one storey addition to the
rear of a two storey single family semi-detached dwelling located at 95 Thursfield Crescent in
the City of Toronto (Toronto and East York Community Council Area).
CFN: 58176 - Application #: 0806/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
427
CITY OF TORONTO - Waterfront Watershed
The purpose is to carry out upgrades to the Ashbridges Bay Wastewater Treatment Plant,
located at 9 Leslie Street, near Commissioners Street. Works will construction of a new UV
disinfection building, as well as landscaping. No in -water works are within the scope of this
project.
CFN: 57271 - Application M 0351/171TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: August 17, 2017
CITY OF TORONTO AND EVERGREEN - Don River Watershed
The purpose is to raise the interior floors, install a mezzanine and lift, partially clad the exterior
walls, install a geothermal system and regrade.
CFN: 58308 - Application M 0888/171TOR
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: July 28, 2017
2599 ST. CLAIR AVENUE EAST - Don River Watershed
The purpose is to construct a new one storey garage addition to the front of an existing single
family detached dwelling located at 2599 St. Clair Avenue East in the City of Toronto (East York
Community Council Area).
CFN: 58231 - Application M 0815/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 21, 2017
62 ROXBOROUGH DRIVE - Don River Watershed
The purpose is to construct a rear one storey addition and deck to the existing single family
dwelling at 62 Roxborough Drive in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 57699 - Application M 0411/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 29, 2017
26 HAMSTEAD AVENUE - Don River Watershed
The purpose is to construct a three-storey addition to the rear and an attached deck on the
northwest side of an existing two storey single family detached dwelling located at 26 Hamstead
Avenue in the City of Toronto ( Toronto and East York Community Council Area).
CFN: 58296 - Application #: 0868/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 25, 2017
124 GLENVIEW AVENUE - Don River Watershed
The purpose is to construct a third floor addition and first floor cantilevered addition to the rear
of an existing three storey single family detached dwelling located at 124 Glenview Avenue in
the City of Toronto (East York Community Council Area).
CFN: 58269 - Application #: 0846/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 18, 2017
CITY OF VAUGHAN
FUMATA DEVELOPMENT CORPORATION - Don River Watershed
The purpose is to undertake works with TRCA's Regulated Area of the Don River Watershed in
order to facilitate servicing and development associated with Draft Approved Plan of Subdivision
19T -15V012. The subject property is located in Planning Block 12, North of Via Romano
Boulevard at Sir Stevens Drive, in the City of Vaughan.
CFN: 57923 - Application #: 0630/171VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 25, 2017
141 CAMLAREN CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 452.33 sq.m (4868.84 sq.ft) two-storey
single detached dwelling associated with a municipal building permit. The subject property is
known municipally as 141 Camlaren Crescent, in the City of Vaughan.
CFN: 58233 - Application #: 0828/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 22, 2017
TOWN OF AJAX
12 MCNEILAGE COURT - Duffins Creek Watershed
The purpose is to construct a replacement deck and replacement basement walkout to the rear
of an existing two storey single family detached dwelling located at 12 McNeilage Court in the
Town of Ajax.
429
CFN: 58246 - Application #: 0843/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 28, 2017
TOWN OF AJAX - Waterfront Watershed
The purpose is to undertake emergency repair works to re -align 3 segments (approximately 622
m) of the Ajax waterfront trail located south of Lake Driveway East and West, between Love
Crescent and McClarnan Road, in the Town of Ajax. This permit is in accordance with the TRCA
Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). No
in -water works are associated with this project.
CFN: 57935 - Application #: 0724/17/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: August 11, 2017
TOWN OF AJAX - Carruthers Creek Watershed
The purpose is to replace twin culverts on Shoal Point Road, approximately 460 m south of Salt
Drive, and resurface Shoal Point Road from Salt Drive to Duckfield Crescent in the Town of
Ajax. This permit is issued in accordance with TRCA's Permission for Emergency Infrastructure
Works Review Protocol (Authority Res. #A105/15). Due to the emergency nature of the works, a
construction timing window will not apply.
CFN: 58278 - Application #: 0878/17/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: August 10, 2017
TOWN OF CALEDON
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction a 495 sq. m (5,332 sq. ft.) residential dwelling
and a septic system associated with a municipal building permit.
CFN: 58251 - Application #: 0847/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apate l@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 9, 2017
430
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 448.4 sq. m (5,826 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58314 - Application #: 0900/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 14, 2017
28 DEER HOLLOW COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 3.3 m by 8.8 m (11 ft by 29 ft) garage
addition associated with a municipal building permit.
CFN: 58119 - Application #: 0721/171CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 21, 2017
PEEL DISTRICT SCHOOL BOARD - Etobicoke Creek Watershed
The purpose is to grade, place fill material, and construct a temporary Stormwater Management
Pond to facilitate the development of a new elementary school.
CFN: 57409 - Application #: 0177/171CAL
Report Prepared by: Anant Patel, extension 5618, email apate l@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 3, 2017
6355 HEALEY ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 18.28 m x 24.38 m (60 ft x 80 ft)
replacement barn associated with a municipal building permit.
CFN: 58412 - Application #: 0998/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 24, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to rehabilitate King Street from Airport Road to The Gore Road, in the Town of
Caledon. The cold water construction timing window will apply to this project.
CFN: 57688 - Application #: 0439/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: August 1, 2017
431
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to rehabilitate King Street from The Gore Road to Harvest Moon Drive, in the
Town of Caledon. The cold water construction timing window will apply to this project.
CFN: 57689 - Application #: 0427/171CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: August 1, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to replace a culvert on King Street approximately 140 m west of Chinguacousy
Road, in the Town of Caledon. This permit was issued in accordance with TRCA's Permission
for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). Due to the
emergency nature of the works, a construction timing window did not apply.
CFN: 57829 - Application #: 0547/17/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: August 18, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to replace a culvert on King Street approximately 10 m east of Chinguacousy
Road, in the Town of Caledon. This permit was issued in accordance with TRCA's Permission
for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). Due to the
emergency nature of the works, a construction timing window did not apply.
CFN: 57830 - Application #: 0548/17/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: August 18, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to install a SWM Shield and new outlet control structure in order to improve
stormwater quality control treatment, and maintenance ease and efficacy at an existing
stormwater management facility at the north east corner of Kennedy Road and Mayfield Road,
in the City of Brampton.
CFN: 58281 - Application #: 0881/17/CAL
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: August 11, 2017
13378 KENNEDY ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 370.52 sq. m (2,988.22 sq. ft.) replacement
dwelling and a septic system associated with a municipal building permit.
432
CFN: 57181 - Application #: 0052/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 21, 2017
TOWN OF RICHMOND HILL
TOWN OF RICHMOND HILL - Rouge River Watershed
The purpose is to conduct grading works and landscape restoration works within a Regulated
Area of the Rouge River watershed southwest of the intersection of Yonge Street and Harris
Avenue in the Town of Richmond Hill.
CFN: 54724 - Application #: 1039/151RH
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: August 22, 2017
TOWN OF RICHMOND HILL - Don River Watershed
The purpose is to undertake relocation of a stormwater management (SWM) facility to manage
stormwater along the tributary of the East Don River through the Elgin Mills Greenway, between
Bathurst Street and Larratt Lane, Shaftsbury Avenue and Canyon Hill Avenue. The works will
include relocation of an existing stormwater management (SWM) facility upstream to the storm
sewer outfall, installation of an oil grit separator at Larratt Lane and naturalization of the outfall
from the existing SWM facility. The works will be undertaken in the dry. The Ministry of Natural
Resources and Forestry (MNRF) Redside dace fisheries timing window will apply to this project,
unless otherwise specified in writing by MNRF.
CFN: 57450 - Application #: 0290/171RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: August 21, 2017
TOWNSHIP OF KING
AUGUSTINIAN FATHERS OF ONT. INC. - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
placement of a 29.7 sq. m (320 sq. ft) mobile office information center and minor landscaping on
lands known municipally as 13760 Keele Street, in the Township of King.
CFN: 58310 - Application #: 0899/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 16, 2017
433
15 JOHN STREET - Humber River Watershed
The purpose is to Facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 494.52 sq. m (5,323 sq. ft) replacement dwelling and associated landscaping
on lands known municipally as 15 John Street, in the Township of King.
CFN: 58318 - Application #: 0898/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 4, 2017
TOWNSHIP OF KING - Humber River Watershed
The purpose is to undertake works with TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 4,300 sq. m. two (2) storey municipal office
building and a 5,516 sq. m. parking area, associated with a municipal building permit. The
subject property is located on lands known municipally as 2585 King Road, in the Township of
King.
CFN: 58390 - Application #: 0984/171KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 18, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
2193914 CANADA LIMITED
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the west side of Dixie Road, south of Springtown Trail, in the City of Brampton, Etobicoke
Creek Watershed as located on property owned by 2193914 Canada Limited, a subsidiary of
Enbridge Gas Distribution Inc. Part of the staging area will be located on property owned the
Region of Peel, under a Franchise Agreement with Enbridge Gas Distribution Inc. The purpose
is to conduct an integrity dig in order to investigate an existing natural gas pipeline. No in -water
works are associated with this project.
CFN: 57944 - Application #: 0677/17113RAM
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 2, 2017
434
CITY OF BRAMPTON
To undertake road/pathway resurfacing or reconstruction at the Airport Road and Queen Street
Intersection, in the City of Brampton, Mimico Creek Watershed as located on the property
owned by the Region of Peel. The purpose is to improve the intersection at Airport Road and
Queen Street to facilitate improvements to ZUM transit in the City of Brampton. No in -water
works are associated with this project.
CFN: 56850 - Application #: 0193/17/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: August 21, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain, utility installation or maintenance within an existing roadway
along Bramalea Road, from Central Parkway Drive to approximately 300 m north of Queen
Street East, in the City of Brampton, Etobicoke Creek Watershed as located on property owned
by the City of Brampton. The purpose is to install a 100 mm diameter conduit for Rogers
Communication Canada Inc. along Bramalea Road, from Central Parkway Drive to
approximately 300 m north of Queen Street East, in the City of Brampton. No in -water works are
associated with this project.
CFN: 58087 - Application #: 0857/171BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: August 23, 2017
CITY OF MARKHAM
CITY OF MARKHAM
To undertake road/pathway resurfacing or reconstruction on Markham Road, 135m north of
Denison Street to 130m south of New Delhi Drive, in the City of Markham, Rouge River
Watershed as located on the property owned by City of Markham. The purpose is to undertake
reconstruction and extension of an existing sidewalk, including excavation and re -grading on
Markham Road, 135 metres north of Denison Street to 130 metres south of New Delhi Drive in
the City of Markham. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace
timing window applies to this project, unless otherwise specified in writing by MNRF.
CFN: 57953 - Application #: 0757/17/1VIARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: August 23, 2017
435
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake structure maintenance at Westlake Memorial Park, located at 86 Jasper Avenue,
in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as
located on property owned by the City of Toronto. The purpose is to undertake the
reconstruction of an existing playground. No in -water work is within the scope of this project.
CFN: 57672 - Application #: 0635/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 17, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Burbank Drive, south of Citation Drive, located near Bayview Avenue and Sheppard Avenue
East, in the City of Toronto (North York Community Council Area), Don River Watershed as
located on property owned by the City of Toronto. The purpose is to install conduit. No in -water
work is within the scope of this project.
CFN: 57682 - Application #: 0817/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 9, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
York Mills Road, east of Clayland Drive, and on 32 Clayland Drive, near York Mills Road, in the
City of Toronto (North York Community Council Area), Don River Watershed as located on
property owned by the City of Toronto and private property with permission obtained. The
purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 58252 - Application #: 0825/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 3, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Finch Avenue West near Milady Road, in the City of Toronto (North York Community Council
Area), Humber River Watershed as located on the property owned by the City of Toronto, under
a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install NPS 30 ST
DFBE XHP and NPS 12 ST DFBE IP gas pipelines. No in -water works are associated with this
project.
436
CFN: 58142 - Application #: 0832/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 29, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 1451 Avenue Road, located south of Lawrence Avenue and east of Avenue Road, in the City
of Toronto (North York Community Council Area), Don River Watershed as located on the
property owned by a private landowner, to whom Enbridge Gas Distribution Inc. is providing
service. The purpose is to relocate a NPS 1 1/4 gas pipeline. No in -water works are associated
with this project.
CFN: 58153 - Application #: 0885/171TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 29, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Don Mills Road and Duncan Mill Road, north of York Mills Road, in the City of
Toronto (North York Community Council Area), Don River Watershed, as located on property
owned by the City of Toronto. The purpose is to undertake cable service upgrades. Works will
involve removal and replacement of the existing cable conduits. No in -water works are within
the scope of this project.
CFN: 56059 - Application #: 0653/161TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 2, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Danforth Road, from north of Trudelle Street to north of Savarin Street, in the City of Toronto
(Scarborough Community Council Area), Highland Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install conduit. No in -water work is within the
scope of this project.
CFN: 57676 - Application #: 0758/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 10, 2017
437
TORONTO HYDRO
To undertake utility pole installation on Kingston Road and 7450 Kingston Road, in the City of
Toronto (Scarborough Community Council Area), Rouge River Watershed as located on
property owned by the City of Toronto and the Toronto and Region Conservation Authority
under management to the City of Toronto. The purpose is to replace the existing overhead
distribution line and associated equipment. No in -water work is within the scope of this project.
CFN: 57680 - Application #: 0760/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 10, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and structure maintenance on the
bridge carrying Glen Cedar Road over Cedarvale Park, between Heathdale Road and
Strathearn Road, northwest of Bathurst Street and St. Clair Avenue West, in the City of Toronto
(Toronto and East York Community Council Area), Don River Watershed, as located on
property owned by the City of Toronto. The purpose is to replace an existing staircase and
carry out bridge rehabilitation. No in -water works are within the scope of this project.
CFN: 57274 - Application M 0441/171TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: August 9, 2017
CITY OF VAUGHAN
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway,
undertake sewer, watermain or utility watercourse crossing by trenchless technology on Teston
Road approximately from Pine Valley Drive to 330 metres west of Kipling Road, in the City of
Vaughan, Humber River Watershed as located on the property owned by the Regional
Municipality of York, under franchise agreement with Enbridge Gas Distribution Inc, and on
private property (10733 Pine Valley Drive) with access subject to a temporary easement. The
purpose is to install a NPS 6" gas pipeline along the north and south sides of Teston Road from
approximately Pine Valley Drive to 330 metres west of Kipling Avenue. The Ministry of Natural
Resources and Forestry (MNRF) Redside Dace Construction Timing Window applies to this
project, unless otherwise specified in writing by MNRF.
CFN: 55422 - Application #: 0120/16NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 15, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Huntington Road near Keyes Court, in the City of Vaughan, Humber River Watershed as
located on the property owned by the City of Vaughan, under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 8 ST DFBE HP gas main in
order to service a new residential subdivision. The Redside Dace fisheries timing window
applies to this project, unless otherwise specified in writing by the Ministry of Natural Resources
and Forestry.
CFN: 57578 - Application #: 0508/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 29, 2017
TOWN OF RICHMOND HILL
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on west side of Yonge Street, north of Naughton Drive to south of Gamble Road in the
Town of Richmond Hill, Don River Watershed as located on the property owned by Regional
Municipality of York. The purpose is to undertake installation of a bell duct on west side of
Yonge Street from north of Naughton Drive to south of Gamble Road, in the Town of Richmond
Hill, Rouge River Watershed. The ducts will be installed by using Horizontal Directional Drilling
(HDD) method and open trench methods. The works are required to accommodate the road
widening of Yonge Street and is associated with the VIVA Bus Rapid Transit (BRT) project.
CFN: 57835 - Application #: 0575/17/RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: August 9, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Yonge Street, west of 19th Avenue, in the Town of Richmond Hill, Rouge River Watershed as
located on the property owned by the Town of Richmond Hill under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 8 ST DFBE HP gas pipeline
crossing a watercourse. No in -water works are associated with this project.
CFN: 58149 - Application #: 0855/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 23, 2017
439
REGIONAL MUNICIPALITY OF YORK
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on 19th Avenue East, west of Leslie Street, in the Town of Richmond Hill, Rouge River
Watershed as located on the property owned by Regional Municipality of York. The purpose is
to extend an existing CSP twin cross culvert (10.21 m x 800mm and 10.36m x 600mm) by 1.5m
on both ends, grind and repave the road asphalt, and extend and restore the granular shoulder
of the road with 5/8 crusher run stone and plantings on 19th Avenue East, west of Leslie Street
in the Town of Richmond Hill. The Ministry of Natural Resources and Forestry (MNRF) Redside
Dace timing window applies to this project unless otherwise specified in writing by the MNRF.
CFN: 57955 - Application #: 0753/17/RH
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: August 23, 2017
TOWNSHIP OF KING
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on King Road east of Highway 27, in the
Township of King, Humber River Watershed as located on the property owned by Regional
Municipality of York. The purpose is to undertake culvert flushing at a cross culvert on King
Road, 390 metres east of Highway 27 in the Township of King, Humber River Watershed. The
Ministry of Natural Resources and Forestry (MNRF) Redside Dace Timing Window will apply to
this project, unless otherwise specified in writing by MNRF.
CFN: 58136 - Application #: 0818/17/KING
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: August 9, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
239 GARDENBROOKE TRAIL
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) on Lot 189, Plan, 239 Gardenbrooke Trail, in the City of Brampton,
Humber River Watershed.
4
CFN: 58385 - Application #: 0963/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 24, 2017
CITY OF PICKERING
1815 FAIRPORT ROAD, UNIT 9
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 6, Plan 40M-
2519, (1815 Fairport Road, Unit 9), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58327 - Application M 0937/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 13
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 10, Plan
40M-2519, (1815 Fairport Road, Unit 13), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58325 - Application M 0939/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 14
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 11, Plan
40M-2519, (1815 Fairport Road, Unit 14), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58324 - Application M 0940/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 7
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 4, Plan 40M-
2519, (1815 Fairport Road, Unit 7), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58328 - Application M 0936/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
441
1815 FAIRPORT ROAD, UNIT 6
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 3, Plan 40M-
2519, (1815 Fairport Road, Unit 6), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58329 - Application M 0935/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 4
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 1, Plan 40M-
2519, (1815 Fairport Road, Unit 4), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58322 - Application M 0942/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 11
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 8, Plan 40M-
2519, (1815 Fairport Road, Unit 11), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58326 - Application M 0938/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
1815 FAIRPORT ROAD, UNIT 8
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5, Plan 40M-
2519, (1815 Fairport Road, Unit 8), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58321 - Application M 0943/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 23, 2017
10 - 1815 FAIRPORT ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (10 - 1815
Fairport Road), in the City of Pickering, Frenchman's Bay Watershed.
442
CFN: 58179 - Application #: 0778/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 9, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
5 ADERNO COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 80, Plan M-
1566, (5 Aderno Court), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 58381 - Application #: 0948/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
11 HEAVITREE DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 85, Plan M-
745, (11 Heavitree Drive), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 58293 - Application #: 0867/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 11, 2017
24 NORDALE CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Lot
25, Plan 3704, (24 Nordale Crescent), in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed.
CFN: 57791 - Application #: 0584/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 16, 2017
443
80 NORTH DRIVE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part 53,
Part 51 E Plan 965W, (80 North Drive), in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed.
CFN: 57996 - Application #: 0637/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 17, 2017
112 LANGDEN AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on (112 Langden
Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed.
CFN: 58295 - Application #: 0870/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n. ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
74 MELDAZY DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 134, Plan
4896, (74 Meldazy Drive), in the City of Toronto (Scarborough Community Council Area),
Highland Creek Watershed.
CFN: 58375 - Application #: 0925/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 24, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
139 STRATHEARN ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Part
Lot 77, 78, Plan 2618, (139 Strathearn Road), in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed.
i i i
CFN: 57399 - Application #: 0166/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 18, 2017
CITY OF VAUGHAN
91 RACHELLE COURT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m
(1614 sq. ft) on a property municipally known as 91 Rachelle Court, in the City of Vaughan,
Humber River Watershed.
CFN: 58270 - Application #: 0851/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 3, 2017
24 MEADOW RIDGE COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 274, Plan 65M-3878, (24 Meadow
Ridge Court), in the City of Vaughan, Don River Watershed.
CFN: 58391 - Application #: 0989/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 22, 2017
1 IVY PLACE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 37, Plan M-1968, (1 Ivy Place), in
the City of Vaughan, Humber River Watershed.
CFN: 58222 - Application #: 0829/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 1, 2017
TOWN OF AJAX
113 FEINT DRIVE
To install a swimming pool on Lot 46, Plan 40M-2285, (113 Feint Drive), in the Town of Ajax,
Duffins Creek Watershed.
MR
CFN: 58344 - Application #: 0910/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 18, 2017
46 WILKIE LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (46 Wilkie
Lane), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 58274 - Application #: 0864/171AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 17, 2017
TOWN OF RICHMOND HILL
49 LYTTON BOULEVARD
To install a swimming pool on Lot 37, Plan 65M-2683, (49 Lytton Boulevard), in the Town of
Richmond Hill, Rouge River Watershed.
CFN: 58347 - Application #: 0921/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: August 11, 2017
12-8 TOWNWOOD DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 12, Plan
65M-3754, (12-8 Townwood Drive), in the Town of Richmond Hill, Rouge River Watershed.
CFN: 58242 - Application #: 0834/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: August 8, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
126 JAMES RATCLIFF AVENUE
To install a swimming pool on , (126 James Ratcliff Avenue), in the Town of Whitchurch-
Stouffville. Duffins Creek Watershed.
CFN: 58392 - Application #: 0986/171WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: August 23, 2017
Ems s
PERMIT APPLICATION 10.6 IS A MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
TOWN OF CALEDON
10.6 ONTARI HOLDINGS LTD./BLACKWOOD PARTNERS INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere, interfere with a wetland and alter a watercourse on
Part Lot 4, 5, Concession 5, (12724 Coleraine Drive), in the Town of Caledon, Humber
River Watershed as located on the property owned by Ontari Holdings Ltd./Blackwood
Partners Inc.. The purpose is to grade, remove and place fill, and construct within a
Regulated Area to facilitate site grading, construction of a temporary sediment pond,
final channel realignment works and installation of a storm sewer pipe associated with a
large format employment land site plan application.
CFN: 58441 - Application #: 10651171CAL
Report Prepared by: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
Date: September 5, 2017
TERMINATION
ON MOTION, the meeting terminated at 10:00 a.m., on Friday, September 08, 2017.
Jack Heath
Vice Chair
/ks
447
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #8/17 was held at TRCA Head Office, on Friday, October
13, 2017. The Chair Maria Augimeri, called the meeting to order at 9:32 a.m.
PRESENT
Maria Augimeri
Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Brenda Hogg
Member
Jennifer Innis
Member
Jennifer McKelvie
Member
PRESENT VIA TELECONFERENCE
Chris Fonseca Member
Colleen Jordan Member
Mike Mattos Member
ABSENT
Jack Heath Vice Chair
Glenn De Baeremaeker Member
Anthony Perruzza Member
RES.#B85/17 - MINUTES
Moved by: Jack Ballinger
Seconded by: Jennifer McKelvie
THAT the Minutes of Meeting #7/17, held on September 8, 2017, be approved.
CARRIED
Section I — Items for Authority Action
RES.#B86/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Monarch Castlepoint Kipling North Development Ltd. and Monarch
Castlepoint Kipling South Development Ltd. CFN 58669. Acquisition of
property located west of Kipling Avenue and north of Stegman's Mill
Road/Teston Road - Kleinburg, in the City of Vaughan, Regional
Municipality of York, under the "Greenlands Acquisition Project for
2016-2020," Flood Plain and Conservation Component, Humber River
watershed.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 84.80 hectares (209.53 acres), more
or less, of vacant land, located west of Kipling Avenue and north of Stegman's Mill
Road/Teston Road - Kleinburg, said land being Part of Lots 26, 27, 28, and 29, Concession
8, designated as Blocks 52 to 64 on a draft Plan of Subdivision prepared by Guido Papa
Surveying, under their Reference No. 15-18-123-09, dated July 25, 2017; Blocks 71 to 75 on
a draft Plan of Subdivision prepared by J. D. Barnes Ltd., under their Reference No.
15-18-123-07, dated April 3, 2017; Blocks 117 & 118, 121 to 138 and 140 & 141 on a draft
Plan of Subdivision prepared by J. D. Barnes Ltd., under their Reference No. 15-18-123-08,
dated April 6, 2017; and Blocks 197 to 205, 209 & 210 and 212 to 217 on a draft Plan of
Subdivision prepared by Guido Papa Surveying, under their Reference No. 15-18-123-10,
undated, in the City of Vaughan, Regional Municipality of York, be purchased from
Monarch Castlepoint Kipling North Development Ltd. and Monarch Castlepoint Kipling
South Development Ltd.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mr. Gaetano Franco of Castlepoint Investments Inc.
Access to the subject lands will be achieved through abutting TRCA-owned property as well as
directly from Kipling Avenue, Stegman's Mill Road/Teston Road and internal roads within the
subdivision.
MEG •
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Zoning By-law Amendment Applications Z.13.041 and Z.13.042 as well as
Subdivisions 19T -13V008 and 19T -13V009 for residential development, TRCA staff establishec
the limits of the open space land.
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: George Leja, extension 5342, Jae
Emails: glela(@trca.on.ca, jtruesdell(aD_trca.on.ca
For Information contact: George, extension 5342, Jae
Emails: glela(a_)trca.on.ca, jtruesdell(a trca.on.ca
Date: September 20, 2017
Attachments: 1
450
Truesdell, extension 5247
Truesdell, extension 5247
RES.#B87/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Etobicoke Creek Watershed
Kennedy Trails Development Inc., CFN 58523. Acquisition of property
located west of Kennedy Road and south of Old School Road, in the Town
of Caledon, Regional Municipality of Peel, under the "Greenlands
Acquisition Project for 2016-2020," Flood Plain and Conservation
Component, Etobicoke Creek watershed.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.29 hectares (0.72 acres), more or
less, of vacant land, located west of Kennedy Road and south of Old School Road, said
land being Part of Lot 21, Concession 1 EHS, designated as Blocks 120 and 121 on a draft
Plan of Subdivision prepared by J. H. Gelbloom Surveying Ltd., under their Project No.
11-005, dated August 18, 2017, in the Town of Caledon, Regional Municipality of Peel, be
purchased from Kennedy Trails Development Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mr. Tom Baskerville, Vice President, Development,
Coscorp Inc. and part owner of Kennedy Trails Development Inc.
Access to the subject lands will be achieved through abutting TRCA-owned lands.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Etobicoke Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Zoning By-law Amendment Application RZ 12-016, and Subdivision 21T -12003C for
residential development, TRCA staff established the limits of the open space land.
452
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets. Taxes
are estimated to be $700 per year.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: gleia(a)trca.on.ca, jtruesdell cDtrca.on.ca
For Information contact: George, extension 5342, Jae Truesdell, extension 5247
Emails: gleja(a)trca.on.ca, jtruesdell(a)trca.on.ca
Date: September 15, 2017
Attachments: 1
453
410
J
Subject
,Property
LegendToronto and Region
Conservation
for The Living City
L J SITE
® TT TORONTO
Saxe onrano
RES.#B88/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Petticoat Creek Watershed
Woodview Land Development Corporation, CFN 58584. Acquisition of
property located at 1952, 1956 and 1960 Woodview Avenue, in the City of
Pickering, Regional Municipality of Durham, under the "Greenlands
Acquisition Project for 2016-2020," Flood Plain and Conservation
Component, Petticoat Creek watershed.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.89 hectares (2.20 acres), more or
less, of vacant land, located at 1952, 1956 and 1960 Woodview Avenue, said land being
Part of Lot 10, Registered Plan 329 designated as Block 23 on draft M -Plan, in the City of
Pickering, Regional Municipality of Durham, be purchased from Woodview Land
Development Corporation;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Jamie Payne, Project Manager, Land Development,
acting as agent for the owner.
Access to the subject lands will be achieved through its frontage on Woodview Avenue.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Petticoat Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Subdivision Application SP -2015-07, TRCA staff established the limits of the open
space land.
455
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(a,)trca.on.ca, jtruesdell&trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(aDtrca.on.ca, jtruesdell(ZDtrca.on.ca
Date: September 11, 2017
Attachments: 1
456
Attachment i --
-A.
.�
Subject,
Pr4�erty - ;
i <�
yv
'I
r
Legend Torontoand Fegion
Conservation YORK DURHAM
for The Living City-
PEEL SITE `
LJ TORONTO
® take onrano
f
457
RES.#B89/17 - THE REGIONAL MUNICIPALITY OF YORK
Request for a Permanent Easement Required for the West Vaughan
Sewage System Project, City of Vaughan, Regional Municipality of York,
Humber River Watershed, CFN 58475. Receipt of a request from the
Regional Municipality of York for a permanent easement required for the
West Vaughan Sewage System Project, located west of Islington Avenue
and south of Regional Road No. 7, in the City of Vaughan, Regional
Municipality of York.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from the Regional Municipality of
York for a permanent easement required for the West Vaughan Sewage System Project,
located west of Islington Avenue and south of Regional Road No. 7, in the City of
Vaughan, Regional Municipality of York, Humber River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Actto cooperate with the Regional Municipality
of York in this instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 0.06 hectares
(0.16 acres), more or less, be granted to the Regional Municipality of York for the West
Vaughan Sewage System Project, being Part of Lot 59, Registrar's Complied Plan No. 9831
and designated as Part 4 on Plan 65R-36246, in the City of Vaughan, Regional Municipality
of York;
THAT consideration be the nominal sum of $2.00; all legal, survey and other costs to be
paid by the Regional Municipality of York;
THAT the Regional Municipality of York is to fully indemnify TRCA from any and all claims
from injuries, damages or costs of any nature resulting in any way, either directly or
indirectly, from the granting of this easement or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigation measures being
carried out to the satisfaction of TRCA staff, at the expense of Regional Municipality of
York;
THAT a landscape plan be prepared for TRCA staff review and approval, in accordance
with existing TRCA landscaping guidelines, at the expense of Regional Municipality of
York;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by
Regional Municipality of York prior to the commencement of construction;
THAT said easement be subject to the approval of the Minister of Natural Resources and
Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
EPP
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
The Regional Municipality of York has requested a permanent easement required for the West
Vaughan Sewage System (WVSS) Project, located west of Islington Avenue and south of
Regional Road No. 7 in the City of Vaughan, Regional Municipality of York, Humber River
watershed. The WVSS Project is comprised of a tunnel designed to increase the sewage
servicing capacity of the existing system to meet the planned and projected growth servicing
demands for the north and west portions of the City of Vaughan to the year 2051. The proposed
WVSS tunnel will convey the additional sanitary flow to the Region of York's Humber Sewage
Pump Station located west of the intersection of Islington Avenue and Steeles Avenue and then
travel to the Kleinburg Water Pollution Control Plan for treatment.
Staff is reviewing the associated Environmental Assessment Act submission for the WVSS
Project; a permit application pursuant to Ontario Regulation 166/06, as amended, will be brought
forward for Executive Committee consideration at a future meeting.
The subject TRCA-owned lands were acquired from B. and C. Investments & A. Calvano on April
21, 1978, under the Humber River Flood Plain Lands Acquisition Project.
Attached is a sketch illustrating the location of the subject lands.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA
staff, revegetated with native woody and herbaceous plant material in accordance with existing
TRCA landscaping guidelines. A landscape plan will be prepared as part of the permit application
submission.
FINANCIAL DETAILS
The Regional Municipality of York has agreed to assume all legal, survey and other costs involved
in completing this transaction.
Report prepared by: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: gleia(a).trca.on.ca, jtruesdell(a)trca.on.ca
For Information contact: George Leja, extension 5342, Jae Truesdell, extension 5247
Emails: gleiaMrca.on.ca, itruesdeIIC&trca.on.ca
Date: September 19, 2017
Attachments: 1
459
RES.#B90/17 - CITY OF TORONTO
Request for Permanent Easement Required for a Replacement Sanitary
Sewer in Chipping Park,City of Toronto, Don River Watershed, CFN
57973. Receipt of a request from City of Toronto, for a permanent
easement required for a replacement sanitary sewer in Chipping Park,
located north of Lawrence Avenue East and east of Don Mills Road, in the
City of Toronto, Don River watershed.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from City of Toronto for a
permanent easement required for a replacement sanitary sewer in Chipping Park located
north of Lawrence Avenue East and east of Don Mills Road, in the City of Toronto, Don
River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with City of Toronto in this
instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 0.27 hectares
(0.66 acres), more or less, of vacant land, required for a replacement sanitary sewer in
Chipping Park, designated as Part Lot 7, Concession 3 East of Yonge Street and shown as
Part 1 on Sketch prepared by Toronto Engineering & Construction Services, No.
PS -2017-023 dated March 31, 2017 in the City of Toronto, be conveyed to the City of
Toronto;
THAT consideration be the nominal sum of $2.00; all legal, survey and other costs to be
paid by City of Toronto;
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from this
conveyance or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigation measures being
carried out to the satisfaction of TRCA staff, at the expense of City of Toronto;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by City of
Toronto prior to the commencement of construction;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of City of Toronto;
THAT said conveyance be subject to the approval of the Minister of Natural Resources
and Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
461
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
The City of Toronto has requested a permanent easement across TRCA-owned lands required
for a new alignment of an existing sanitary sewer in Chipping Park, located north of Lawrence
Avenue East and east of Don Mills Road, in the City of Toronto, Don River watershed.
Works will involve construction of a new sanitary sewer along a new alignment, followed by
abandonment of the existing one and restoration of the site.
The subject lands required by the City of Toronto are located within the Regulated Area of the Don
River. A permit application pursuant to Ontario Regulation 166/06, as amended, has already been
approved by the Executive Committee.
The subject TRCA-owned lands were acquired from Municipality of Metropolitan Toronto on
February 23, 1972 under the Don River Flood Plain Lands Project.
Attached is a sketch illustrating the location of the permanent easement.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA
staff, revegetated with native woody and herbaceous plant material in accordance with existing
TRCA landscaping guidelines. A landscape plan has been prepared as part of the permit
application submission.
FINANCIAL DETAILS
The City of Toronto has agreed to assume all legal, survey and other costs involved in completing
this transaction.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewon4(rDtrca.on.ca, jtruesdell(cittrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewona(ZDtrca.on.ca, jtruesdeII@,trca.on.ca
Date: September 14, 2017
Attachments: 1
462
Legend
L�
Permanent •" '
Easement
i
.......... ..
Toronto and Region
Conservation
for The Living City
-
s�
0
OD
L„"
RES.#B91/17 - TOWN OF RICHMOND HILL
Request for Permanent Easement for a Stormwater Pond Outfall
Town of Richmond Hill, Regional Municipality of York, Rouge River
Watershed, CFN 57528. Receipt of a request from DG Group and the
Town of Richmond Hill to provide an easement required for a new
stormwater pond outfall, located north of Stouffville Road and west of
Leslie Street, municipally known as 940 Stouffville Road, in the Town of
Richmond Hill, Regional Municipality of York, Rouge River watershed.
Moved by: Jennifer Innis
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from DG Group and the Town of
Richmond Hill for a permanent easement required for a new stormwater pond outfall,
located north of Stouffville Road and west of Leslie Street, municipally known as 940
Stouffville Road, in the Town of Richmond Hill, Regional Municipality of York, Rouge River
watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with DG Group and Town of
Richmond Hill in this instance;
THEREFORE LET IT BE RESOLVED THAT a permanent easement containing 0.17 hectares
(0.43 acres), more or less, of vacant land, be granted in favour of the Town of Richmond
Hill, said lands being Part of Lot 2, Concession 2, and designated as Part 1 on draft Plan
created on April 20, 2017 by Holding Jones Vanderveen Inc., in the Town of Richmond Hill,
Regional Municipality of York;
THAT consideration be the sum of $350,000; all legal, appraisal, survey and other costs to
be paid by DG Group;
THAT DG Group and the Town of Richmond Hill is to fully indemnify TRCA from any and
all claims from injuries, damages or costs of any nature resulting in any way, either
directly or indirectly, from this conveyance or the carrying out of construction;
THAT an archaeological investigation be completed, with any mitigation measures being
carried out to the satisfaction of TRCA staff, at the expense of DG Group;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by the DG
Group prior to the commencement of construction;
THAT all TRCA lands disturbed by the proposed works be revegetated/stabilized following
construction and where deemed appropriate by TRCA staff, a landscape plan be prepared
for TRCA staff review and approval in accordance with existing TRCA landscaping
guidelines, at the expense of the DG Group;
THAT said conveyance be subject to the approval of the Minister of Natural Resources
and Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
Em
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
DG Group approached TRCA to negotiate a permanent easement required by the Town of
Richmond Hill. The proposed stormwater outfall will service a stormwater facility required as part
of the adjacent development lands owned by DG Group.
In accordance with TRCA review guidelines "Use of Authority Owned Lands for Stormwater
Management Facilities" approved at Authority Meeting #11/92, held on January 22, 1993, the
proponent has demonstrated that the proposed location on TRCA-owned land is reasonable and
all technical requirements of TRCA staff has been satisfied. A detailed design will be carried out
prior to construction of the stormwater pond outfall, and a permit will be required under Ontario
Regulation 166/06, as amended.
The subject TRCA-owned lands were acquired from 1419079 Ontario Ltd., on May 4, 2006 under
the Rouge River Flood Plain Lands.
Plantings
All lands disturbed by construction will be stabilized and, where deemed appropriate by TRCA
staff, revegetated with native woody and herbaceous plant material in accordance with existing
TRCA landscaping guidelines. A landscape plan will be prepared as part of the permit application
submission.
Attached is a sketch illustrating the location of the permanent easement.
FINANCIAL DETAILS
The easement compensation is based on market value as determined by D. Bottero & Associates
Limited. DG Group has agreed to assume all legal, appraisal, survey and other costs involved in
completing this transaction. Funds obtained from this permanent easement will be utilized for the
purchase of priority properties under the Greenlands Acquisition Project.
Report prepared by: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(aDtrca.on.ca, jtruesdell(aDtrca.on.ca
For Information contact: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(cDtrca.on.ca, jtruesdell(dtrca.on.ca
Date: Friday, October 13, 2017
Attachments: 1
Rep
Section II — Items for Executive Action
RES.#B92/17 - ALBION HILLS CONSERVATION AREA BEACH CENTRE PROJECT
Septic Upgrades. Award of Contract #10004924 for the supply of all labour,
equipment and materials necessary for septic system upgrades at Albion
Hills Conservation Area, in the Town of Caledon.
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THAT Contract #10004924 be awarded to Reg -Con Inc. for septic system upgrades at
Albion Hills Conservation Area Beach Centre, in the Town of Caledon, at a total cost not to
exceed $154,425.00, plus HST, as they are the lowest bidder that best meets Toronto and
Region Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 20%
of the contract cost as a contingency allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take any action necessary
to implement the agreement including obtaining any required approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
In order to be compliant with the Environmental Protection Act, Albion Hills Conservation Area
(AHCA) underwent an Environmental Compliance Approval (ECA) process for all sewage
systems located at AHCA in 2015. The ECA issued by the Ministry of the Environment and
Climate Change (MOECC) included several special conditions that TRCA must comply with and
within specific timelines. In part, the conditions specified that TRCA shall submit an application for
an Amended ECA for approval of necessary upgrades to the existing Beach Centre sewage
system, for compliance with current design standards, and shall include a proposed construction
time schedule for the MOECC's approval.
The Albion Beach Centre system consists of an existing one -compartment sewage lift station with
a total capacity of 4,500 L, equipped with two alternating submersible sewage pumps that collect
wastewater from the Beach Centre and discharge it to a two-compartment precast concrete septic
tank. There also exists an in -ground conventional leaching bed. The current septic tank for this
system was noted to have large openings in the lid and was not sealed and as such deemed as a
health and safety concern. In addition to this issue, an odour was detected during the time of the
site visit for the assessment. The force main was scoped and it was noted that a section of the
pipe was showing signs of a crack, however there was no evidence of leaking along the
forcemain/discharge to surface. Furthermore, the septic system failed in 2015 and now relies on
frequent pump outs of the holding tank in order to accommodate users.
467
In 2016, TRCA retained WSP Canada Inc. to submit an amendment to ECA No. 2851-98NJ9J
based on the aforementioned MOECC request. Based on the investigation by WSP and
requirements for ECA approval, the current septic system at the Beach Centre was determined to
require upgrades in order to be compliant with current MOECC standards and regulations and
remain serviceable.
RATIONALE
Tender #10004924 was publicly advertised on the electronic procurement website Biddingo
(www.biddin-go.com) on July 20, 2017 with a mandatory site information meeting held on July 27,
2017. Tender packages were sent to the following four contractors:
Reg -Con Inc.;
Metric Contracting;
Norline Plumbing & Mechanical Limited; and
Allto Construction.
The Procurement Opening Committee opened the Tenders on August 10, 2017 with the following
results:
Tender #10004924 Albion Hills Conservation Area Beach Centre Project — Septic Upgrades
BIDDERS TOTAL
(plus HST)
Reg -Con Inc. $154,425.00
Norline Plumbing & Mechanical Ltd. $342,203.25
Restoration and Infrastructure staff reviewed the bid received from Reg -Con Inc. against its own
cost estimate and has determined that the bid is of reasonable value and also meets the
requirements as outlined in the contract documents. Further assessment by TRCA staff of
Reg -Con Inc.'s experience and ability to undertake similar projects was conducted through
reference checks, which resulted in positive feedback that Reg -Con Inc. is capable of undertaking
the scope of work.
Based on the bids received, staff recommends that Reg -Con Inc. be awarded Contract
#10004924 for septic upgrades at Albion Hills Conservation Area, in the Town of Caledon, at a
total cost not to exceed $154,425.00, plus HST, to be expended as authorized by TRCA staff, plus
a 20% contingency, plus HST, it being the lowest bid that meets TRCA specifications.
FINANCIAL DETAILS
Funds are available through the Region of Peel, within capital account code 420-63.
Report prepared by: Michelle Guy, extension 5905
Emails: mguy(oDtrca.on.ca
For Information contact: Aaron J. D'Souza, extension 5775
Emails: aidsouza(dtrca.on.ca
Date: September 6, 2017
RES.#B93/17 - TRAIL IMPROVEMENT PROJECTS - KENNEDY VALLEY TRAIL,
SOUTH ETOBICOKE SHERWAY GARDEN TRAIL AND VALLEYWOOD
PHASE 2
Contract #10005807 — Asphalt Paving Works. Award of contract for paving
works of three trails at the Kennedy Valley Trail, South Etobicoke Sherway
Garden Trail and Valleywood Phase 2 Trail located within the
municipalities of Brampton, the City of Toronto and the Town of Caledon.
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THAT Contract #10005807 for Asphalt Paving Works be awarded to Diamond Earthworks
Corp., for three trails at the Kennedy Valley Trail Project, South Etobicoke Sherway
Garden Trail Project and Valleywood Phase 2 Project, at a total cost not to exceed
$166,793.96 plus HST, as they are the lowest bidder that best meets Toronto and Region
Conservation Authority (TRCA) specifications;
THAT Toronto and Region Conservation Authority (TRCA) staff be authorized to approve
additional expenditures to a maximum of 10% of the contract cost as a contingency
allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take any action necessary
to implement the contract including obtaining any required approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
TRCA is involved in a joint initiative between City of Brampton, Region of Peel, City of Toronto
and the Town of Caledon to implement trail linkages between these municipalities along
Etobicoke Creek. The proposed trail linkages will provide an inter -connected system of active
transportation routes to major destinations and allow an opportunity to implement various
restoration projects. Potential restoration projects may include; wetland creation, riparian
enhancements and habitat work. These trail enhancements will help to promote the Etobicoke
Creek trail system as a safe, sustainable and efficient means of active transportation for various
trail users. The planning, layout and construction of subbase for the three trails are being
executed by TRCA crews. Hobden Construction is also executing three pedestrian bridge
crossings along the trails as part of the development; therefore staff is requesting to proceed with
retaining a qualified contractor to carry out the asphalt paving works for the three trails.
RATIONALE
Request for Tender (RFT) #10005807 for general contractors was publicly advertised on the
electronic procurement website Biddingo (www.biddingo.com) on August 25, 2017. A mandatory
site information meeting was held on September 1, 2017. The following contractors attended this
meeting:
Diamond Earthworks Corp.;
Serve Construction Ltd.;
Pacific Paving Ltd.;
Appco Paving; and
Ashland Paving Ltd.
The Tender closed on September 8, 2017 and the Procurement Opening Committee opened the
Tenders that same day with the following results:
BIDDERS
TOTAL CONTRACT AMOUNT
Plus HST
Diamond Earthworks Corp.
$166,793.96
Serve Construction Ltd.
$197,568.25
Pacific Paving Ltd.
$181,469.00
Appco Paving
$216,496.00
Ashland Paving Ltd.
$289,296.50
Restoration and Infrastructure staff reviewed the bid received from Diamond Earthworks Corp.
against its own cost estimate and has determined that the bid is of reasonable value and also
meets the requirements as outlined in the contract documents. Further assessment by TRCA staff
of Diamond Earthworks Corp.'s experience and ability to undertake similar projects was
conducted through reference checks which resulted in positive feedback that Diamond
Earthworks Corp. is capable of undertaking the scope of work.
Therefore staff recommends that the lowest bidder Diamond Earthworks Corp. be awarded
Contract #10005807 at a total amount not to exceed $166,793.96, to be expended as authorized
by TRCA staff, plus a 10% contingency, plus HST, it being the highest ranked proposal based on
reasonableness of cost and experience with similar projects.
FINANCIAL DETAILS
Funding for this project is provided by City of Toronto under account 126-24 for the South
Etobicoke Sherway Garden Trail Project, City of Brampton under account 117-31 for the Kennedy
Valley Trail Project, and ARGO Development Corporation under account 117-33 for the
Valleywood Phase 2 Project from funds identified through the planning process.
Report prepared by: Vince D'Elia, extension 5667
Emails: vdelia(rDtrca.on.ca
For Information contact: Vince D'Elia, extension 5667
Emails: vdelia(&trca.on.ca
Date: September 27, 2017
470
RES.#B94/17 - HEART LAKE CONSERVATION AREA PROJECT
Award of Sole Source Contract for the Purchase of a Pool Filter. Award of
sole source contract for the purchase of a pool filter for Heart Lake
Conservation Area, in the City of Brampton.
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THAT Contract #10004134 be awarded to NCAquatics for the purchase of a pool filter for
Heart Lake Conservation Area (HLCA), in the City of Brampton, at a total cost not to
exceed $173,371, plus 10% contingency, plus HST;
AND FURTHER THAT authorized officials be directed to take the necessary action to
implement the contract including obtaining necessary approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
In 2011, Toronto and Region Conservation Authority (TRCA) constructed a Class A outdoor
public swimming pool in order to replace the lake swimming program previously available at Heart
Lake Conservation Area. The pool was constructed through funding from the Recreational
Infrastructure Canada (RInC)/Ontario Recreation Program and Region of Peel.
The pool at HLCA has a volume of 1,000,000 litres and a filtration system consisting of eight
pressure diatomaceous earth (DE) filters ("Quad DE 100"). This filtration system was chosen due
to its compact size, providing the ability to save costs on the footprint of the mechanical building;
as well as the fact that it requires very little water to backwash the system. Minimal water use for
backwashing presents a significant advantage at HLCA as the site is not equipped with sewer
servicing and there is no means to dispose of large volumes of chlorine treated water.
Over the past five years of operations, staff noted the following operational challenges associated
with the existing filtration system:
Staff time required to maintain/clean the eight filters is very involved, requires specialized
training and amounts to over $15,000 in labour each season;
Replacement parts and equipment due to wear and tear of the system (clamp kits and
filter cartridges) amount to over $5,000 each season;
Cloudy water during times of high bather loads, leading to early pool closure during peak
business season.
In 2016, TRCA solicited the services of Aqua Plans Aquatic Consultants Inc. (APAC) to provide
professional services to investigate and assess the functioning of the existing filtration system and
make recommendations regarding how to optimize operations and explore the current market of
pool filtration products.
In July of 2016, upon their investigation and assessment of the existing system, APAC reported
that:
The existing filtration system meets all legislated requirements (Ontario Building Code
Section 3.11; Ontario Health Protection and Promotion Act 565), more specifically the
system meets the required turnover rate, filtration area required and flow rate.
471
The existing filtration system is running near the maximum capabilities of each filter, and
the high bather loads experienced at the HLCA pool (over 25,000 people per season) may
be "overloading' the current filtration system.
Having a large quantity of small filters is highly unusual and is contributing to the time and
costs required to maintain the system.
Switching to one larger filter system would be highly beneficial to the facility, ensuring
proper water filtration while reducing time and costs associated with operation.
Taking into consideration the aforementioned findings, APAC's 2016 report suggested that TRCA
replace the existing filtration system with a Regenerative Filtration System from Neptune Benson.
This unit will fit the existing footprint of the mechanical room with minor structural modification to
the ceiling trusses, ensure proper filtration, greatly reduce maintenance costs and produce very
little backwash water waste while using very little energy.
It is important to note that at the time of original design and to -date, the HLCA pool site poses the
following constraints:
There is no sewer connection to the park, instead a 1000 gallon holding tank exists to hold
any water produced by the filter backwash process. Therefore any system requiring a
large volume ( greater than 1000 gallons) of water for backwashing does not meet the site
requirements;
The footprint of the mechanical room is 22.3 mz, limiting the size of the filtration system
that can be placed inside; and
When the pool was designed, in 2010, regenerative filtration systems had not yet entered
the Canadian market, these systems started to be more commonly used after 2011.
Following APAC's recommendation for the installation of a Regenerative Filtration System from
Neptune Benson, TRCA requested that APAC report on all existing systems suitable for the Heart
Lake Pool and summarize the findings so that TRCA may create a matrix in order to make a
decision. In 2017 APAC produced the following findings:
Filtration
System
Pros
Cons
Capital Investment
Cost
Regenerative
Fits within existing
Significant initial capital investment
$173,371 for filter
Filtration System
building footprint
supply and
from Neptune
Produces little
installation
Benson
backwash water
$71,000 for
Reduces staff time
structural changes to
and addresses
HL Pool building
concerns related to
TOTAL: $244,370
high maintenance
costs
Sand Filtration
Low cost
Produces backwash of 5,570 US
$25,000 for filter
System
Easy to operate
gallons of water, over five times
supply and
more than what the existing holding
installation
tank can accommodate
Approximately
HLCA does not have an adequate
$700,000 for public
sanitation system in place to accept
sewer connection
this amount of backwashed water
TOTAL: $725,000
as the volume exceeds the size of
472
Filtration
System
Pros
Cons
Capital Investment
Cost
the septic tank/bed.
A sanitary sewers stem is required
Open Top DE
Uses low amount of
Significant initial capital investment
$145,000 for filter
Filter System
water to backwash
Too large to fit inside mechanical
supply and
room, will require construction of
installation
additional structure on site
Approximately
There is currently no room on
$70,00 for additional
site for an additional structure
outdoor excavation,
structure / roof and
fencing
TOTAL: $215,000
TRCA operations staff has interviewed and conducted an extensive site visit at the Nelson Pool in
Burlington that recently installed a Regenerative Filtration System from Neptune Benson. Staff
has been satisfied with the operational requirements and demands of this system. This system
will significantly reduce strain on operating staff and budgets, as well as have the ability to
accommodate higher bather loads.
RATIONALE
As the existing eight filters are currently functioning at capacity, and soon may not be able to keep
up with HLCA's growing attendance, staff recommends the installation of the Regenerative
Filtration System from Neptune Benson, as it provides the most benefits associated with the
required capital expense.
The Defender Filtration System is commonly used within the industry for public pools of this size,
however, is only supplied exclusively by NCAquatics. TRCA is proposing to purchase the
equipment from NCAquatics, on a sole source basis, as they are the only Canadian distributer
that carries this specific filtration system. Staff therefore recommends award of the contract on a
sole source basis as per Section 9.2.3 of TRCA's Purchasing Policy as follows:
the goods or services are unique to one supplier and no practical alternatives or
substitutes exist.
FINANCIAL DETAILS
Funding for this project is available from the Region of Peel in TRCA's Asset Management
Implementation Account #006-62.
Report prepared by: Kate Pankov, extension 6418
Emails: kuankov(cDtrca.on.ca
For Information contact: Aaron J. D'Souza, extension 5775
Emails: aidsouza(d-)trca.on.ca
Date: September 26, 2017
473
Section IV — Ontario Regulation 166/06, As Amended
RES.#695/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Jennifer McKelvie
Seconded by: Vincent Crisanti
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.6, and 10.9 — 10.10 which are listed below:
PERMIT APPLICATIONS 10.1 — 10.6 ARE MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF BRAMPTON
10.1 1328722 ONTARIO LTD. (ROYAL CANADIAN STEEL INC.)
To construct, reconstruct, erect or place a building or structure on Concession 640
Block PART C, Plan, (70 Titan Road), in the City of Brampton, Etobicoke Creek
Watershed as located on the property owned by 1328722 Ontario Ltd. (Royal Canadian
Steel Inc.). The purpose is to undertake works within TRCA's Regulated Area of the of
the Etobicoke Creek Watershed in order to facilitate the construction of a 7,271 sq.m
(78,264 sq.ft) addition to an existing industrial building as well as a flood storage swale
associated with a municipal Site Plan application (SPA 17-013) and building permit.
CFN: 57503 - Application #: 0283/17/BRAM
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: October 2, 2017
474
CITY OF BRAMPTON
10.2 1328722 ONTARIO LTD. (ROYAL CANADIAN STEEL INC.)
To construct, reconstruct, erect or place a building or structure on Part Lot C,
Concession 640, (70 Titan Road), in the City of Brampton, Etobicoke Creek Watershed
as located on the property owned by Ahsan Salim Dharani. The purpose is to undertake
works within TRCA's Regulated Area of the Etobicoke Creek Watershed in order to
facilitate the construction of a flood storage swale on municipal owned lands. The
proposed works are required to implement a cut and fill analysis associated with a new
7,271 sq.m (78,264 sq.ft) addition to an existing industrial building which is proposed for
70 Titan Road (CFN: 58530).
CFN: 58530 - Application #: 1073/17/BRAM
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: October 2, 2017
CITY OF BRAMPTON
10.3 DIPOCE MANAGEMENT INC.
To site grade and alter a watercourse on Lot 6, Concession 8, Humberwest and
Goreway Drive, in the City of Brampton, Humber River Watershed as located on the
property owned by DiPoce Management Inc.. The purpose is to undertake works within
a TRCA Regulated Area of the Humber River Watershed in order to facilitate the
realignment of the stream corridor bisecting the subject property.
CFN: 45381 - Application #: 0083/11/BRAM
Report Prepared by: Anant Patel 5618 apatel@trca.on.ca
For information contact: Anant Patel 5618 apatel@trca.on.ca
Date: October 2, 2017
TOWN OF RICHMOND HILL
10.4 152 GREENBELT CRESCENT
To construct, reconstruct, erect or place a building or structure on Lot 52, PART 11, Plan
65R-4273, (152 Greenbelt Crescent), in the Town of Richmond Hill, Don River
Watershed. The purpose is to recognize the construction of a 3.5 m by 5.4 m covered
deck and patio at the rear of an existing dwelling within TRCA's Regulated Area of the
Don River Watershed. The works were constructed without the benefit of TRCA or
municipal permits. As such, an additional application fee of 100% was charged for this
"after -the -fact" permit.
CFN: 58576 - Application #: 1121/17/RH
Report Prepared by: Nicholas Cascone 5927 ncascone@trca.on.ca
For information contact: Nicholas Cascone 5927 ncascone@trca.on.ca
Date: October 4, 2017
475
TOWN OF WHITCHURCH-STOUFFVILLE
10.5 SAVENA COVE HOMES INC.
To site grade and alter a shoreline on Part Lot 46, Concession 1 Part 19, Part 24, Part
25 Plan RS65R8788, (12785 Ninth Line), in the Town of Whitchurch-Stouffville, Rouge
River Watershed as located on the property owned by Savena Cove Homes Inc.. The
purpose is to facilitate, within TRCA's Regulated Area of the Rouge River watershed, the
modification of the floodplain line and wetland enhancement on the subject lands to
facilitate the development potential of the lands currently subject to flooding under the
Regional storm event.
CFN: 58110 - Application #: 0728/171WS
Report Prepared by: Jackie Burkart 5304 jburkart@trca.on.ca
For information contact: Jackie Burkart 5304jburkart@trca.on.ca
Date: September 29, 2017
12980 8TH CONCESSION ROAD
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Part Lot 5, Concession 8, (12980 8th Concession Road), in the
Township of King, Humber River Watershed. The purpose is to undertake works within
TRCA's Regulated Area of the Humber River Watershed to facilitate a replacement
septic system at the property municipally known as 12980 8th Concession in the
Township of King.
CFN: 58113 - Application #: 0731/171KING
Report Prepared by: Polina Barn 5256 polina.bam@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: September 29, 2017
RES411396/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED — ERRATA APPLICATIONS
Moved by: Jennifer McKelvie
Seconded by: Vincent Crisanti
THAT a permit be granted in accordance with Ontario Regulation 166/06, as amended, for
application 10.7 that had been scheduled on the agenda as an errata application, for
which all the required information was received and finalized.
CARRIED
PERMIT APPLICATION 10.7 IS A MAJOR APPLICATION - ERRATA
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency works, resolution of violations/after the fact permits, trail construction.
476
CITY OF VAUGHAN
10.7 1539028 ONTARIO INC.
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere
and alter a watercourse on Lot 30, Concession 8, (5315 Kirby Road), in the City of
Vaughan, Humber River Watershed as located on the property owned by 1539028
Ontario Inc. The purpose is to allow development within a Regulated Area of the Humber
River Watershed to facilitate the construction of a pedestrian trail and implementation of
edge management / restoration plantings in a draft approved plan of subdivision (19T -
14V011) within Block 55 East, west of Kipling Avenue and south of Kirby Road, in the
City of Vaughan.
CFN: 58334 - Application #: 0918/17/VAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: October 2, 2017
RES.#B97/17 - STANDARD DELEGATED PERMITS
Moved by: Jennifer McKelvie
Seconded by: Vincent Crisanti
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.8 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF BRAMPTON
23 BURTREE DRIVE - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 37.9 sq. m (408 sq. ft.) replacement deck
located at the rear of an existing residential dwelling associated with a municipal building permit.
CFN: 56404 - Application #: 0846/161BRAM
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 31, 2017
477
CANADREAM INC. - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a pedestrian walkway and utility connection
within a municipal right of way (i.e. West Drive). The proposed works are associated with a new
1,188.35 square metre (12, 791.29 square feet) two-storey motor vehicle garage which is
proposed for 33 West Drive (CFN: 57914).
CFN: 57913 - Application #: 0613/171BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: September 6, 2017
CANADREAM INC. - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 1,188.35 square metre (12,791.29 square
feet) two-storey motor vehicle garage, parking area and pedestrian walkway associated with a
municipal Site Plan application (SPA 16-060.000) and building permit.
CFN: 57914 - Application #: 0612/17/BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: September 6, 2017
CITY OF BRAMPTON - Etobicoke Creek Watershed
The purpose is to undertake routine stormwater management pond maintenance including
sediment removal on 100 Sandalwood Parkway in the City of Brampton. The warm water
construction timing window will be applied to this project.
CFN: 58150 - Application #: 0854/171BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 14, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to widen The Gore Road at approximately Beamish Court (north of Countryside
Drive) from a 2 lane rural cross-section to a 4 lane urban cross-section, including construction of
left and right turn lanes at intersections and a sidewalk on the west side. The redside dace
construction timing window will be applied to this work, unless otherwise specified in writing by
the Ministry of Natural Resources and Forestry (MNRF).
CFN: 56403 - Application #: 1268/16/BRAM
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: September 13, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to widen and reconstruct Mayfield Road from approximately 465 m east of
Bramalea Road to Torbram Road in the City of Brampton. The Redside Dace construction
timing window will be applied to this project unless otherwise specified in writing by the Ministry
of Natural Resources and Forestry (MNRF).
CFN: 56600 - Application #: 1080/16/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 11, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to widen The Gore Road from 300 m north of Castlemore Road to just south of
Edgeforest Drive from a 2 lane rural cross-section to a 4 lane urban cross-section, including
construction of left and right turn lanes at intersections and a sidewalk on the west side. The
warmwater construction timing window will be applied to this work.
CFN: 57033 - Application #: 1270/16113RAM
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: September 12, 2017
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to widen and reconstruct Mayfield Road from Torbram Road to Airport Road in
the City of Brampton. The Redside Dace construction timing window will be applied to this
project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry
(MNRF).
CFN: 58135 - Application #: 0824/17/113RAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 11, 2017
SIKH LEHAR INTERNATIONAL ORGANIZATION - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 4.11 m x 4.11 m radio antenna base
located to the rear of an existing industrial building associated with a municipal site application
(City File No. SP16.002.000) and municipal building permit.
CFN: 58580 - Application #: 1123/17/BRAM
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: September 28, 2017
WOLVERLEIGH CONSTRUCTION LTD. - Etobicoke Creek Watershed
The purpose is to site grade within a Regulated Area of the Etobicoke Creek watershed to
facilitate topsoil stripping associated with a residential draft plan of subdivision.
479
CFN: 48549 - Application #: 1035/12113RAM
Report Prepared by: Leilani Lee -Yates, extension 5370, email Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates, extension 5370, email Ilee-yates@trca.on.ca
Date: September 13, 2017
CITY OF MARKHAM
2439824 ONTARIO INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to demolish an existing two-storey industrial building to facilitate the construction of a
single -storey industrial building.
CFN: 58413 - Application #: 1009/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: August 22, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to construct trail and pedestrian bridge crossings in Area 4 of the City of
Markham's Multi -Use Pathway within the Milne Dam Conservation Park. The Ministry of Natural
Resources and Forestry (MNRF) warm water fisheries timing window will apply to this project
unless otherwise specified in writing by MNRF.
CFN: 51066 - Application #: 0457/14/MARK
Report Prepared by: Suzanne Bevan, extension 5759, email sbevan@trca.on.ca
For information contact: Suzanne Bevan, extension 5759, email sbevan@trca.on.ca
Date: September 25, 2017
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake stream bank stabilization at 6127 Highway 7, near Markham Road,
in the City of Markham. The warm water construction timing window will apply to these works.
CFN: 58285 - Application #: 0955/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: September 28, 2017
15 TREELINE COURT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a replacement deck approximately 40 square metres
(430 square feet) in size at the rear of an existing dwelling.
CFN: 58588 - Application #: 1106/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: September 18, 2017
REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed
The purpose is to undertake improvements to the intersection at Highway 7 and Main Street
Unionville, including a minor widening of Highway 7 to accommodate a westbound curb stop,
and resurfacing and replacing the existing transit stop shelters with two new transit stop
shelters. This project is associated with the York Regional Transit VIVA Network Expansion
Plan, purple and orange routes. The Ministry of Natural Resources and Forestry (MNRF)
Redside Dace fisheries timing window applies to this project, unless otherwise specified in
writing by MNRF.
CFN: 55321 - Application #: 0072/16/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: August 24, 2017
YORK CONDO CORP. 369 - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to demolish an existing wooden retaining wall, in order to facilitate the construction
of a replacement retaining wall (i.e. armour stone) on the subject property.
CFN: 58386 - Application #: 0970/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: August 16, 2017
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA - Etobicoke Creek Watershed
The purpose is to reconstruct a storm outlet structure along the northeast bank of Little
Etobicoke Creek, near 3115 Sunnyhill Drive, in the City of Mississauga. The warm water
construction timing window applies to this project.
CFN: 57694 - Application #: 0622/17/MISS
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 21, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to construct a watermain and a feedermain at the intersection of Tomken Road
and Britannia Road. In addition, a new multi -use trail will be constructed which will connect to
the existing multi -use trail on Tomken Road. The warm water construction timing window will
apply to this project.
CFN: 58436 - Application #: 1055/17/MISS
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 20, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to construct a watermain and a feedermain on Tomken Road, from the Britannia
Road intersection to Eastgate Parkway and along Eastgate Parkway from Tomken Road to
Dixie Road. In addition, a new multi -use trail will be constructed along the east side of Tomken
Road at the Eastgate Parkway and Tomken Road intersection and will connect to the existing
multi -use trail on Tomken Road. The warm water construction timing window will apply to this
project.
CFN: 58437 - Application #: 1056/17/MISS
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 21, 2017
CITY OF PICKERING
1606 BURNSIDE DRIVE - Duffins Creek Watershed
The purpose is to construct a basement walkout and interior alterations for a new secondary
suite in the basement of the existing single family detached dwelling at 1606 Burnside Drive in
the City of Pickering.
CFN: 58487 - Application #: 1027/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 1, 2017
GROSSI GROUP BUILDING CORPORATION INC. - Petticoat Creek Watershed
The purpose is to undertake site grading and fill placement to facilitate the development of 27
townhomes and associated servicing on the vacant lands at 305 Sparrow Circle in the City of
Pickering.
CFN: 57236 - Application #: 0108/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 31, 2017
G. L. GROUP LTD. (SQUIRE BEACH HOLDINGS LTD.) - Duffins Creek Watershed
The purpose is to strip soil and rough grade.
CFN: 56669 - Application #: 0933/16/PICK
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 13, 2016
i
NORTH PICKERING COMMUNITY MANAGEMENT INC. - Duffins Creek Watershed
The purpose is to construct a new sanitary trunk sewer of approximately 2,520 m in length from
the future proposed Whitevale Bypass (Alexander Knox Road), north through future
development blocks and connecting at the future Whites Road extension, as part of the required
servicing for the new Seaton community in the City of Pickering. The warmwater construction
timing window will apply to these works.
CFN: 56852 - Application #: 0191/17/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: September 15, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
DANIELS HUMBER RIVER CORPORATION - Humber River Watershed
The purpose is to carry out pre -grading works to facilitate the future construction a municipal
roadway and servicing related to a planned multi -unit residential subdivision.
CFN: 58316 - Application #: 0917/171TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 4, 2017
51 VALECREST DRIVE - Humber River Watershed
The purpose is to construct a partial second storey addition above the existing single family
detached dwelling municipally described as 51 Valecrest Drive in the City of Toronto (Etobicoke
York Community Council Area). Also proposed is some interior alterations which involve
reconstruction of a portion of existing exterior walls to convert the indoor pool area into garage
space.
CFN: 57784 - Application #: 0500/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 12, 2017
ENBRIDGE GAS DISTRIBUTION INC. - Humber River Watershed
The purpose is to carry out works to permanently cover and prevent further erosion and
exposure of a 30" gas pipeline along Lavender Creek. The warmwater construction timing
window applies to this project..
CFN: 57859 - Application #: 0610/171TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: August 31, 2017
8 RIVERSIDE CRESCENT - Humber River Watershed
The purpose is to construct a replacement sunroom to the rear of the existing single family
dwelling at 8 Riverside Crescent in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 58492 - Application #: 1032/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 14, 2017
11 TODD BROOK DRIVE - Humber River Watershed
The purpose is to construct a one storey rear addition, two storey side addition and attached
garage to the existing single family dwelling at 11 Todd Brook Drive in the City of Toronto
(Etobicoke York Community Council Area).
CFN: 57369 - Application #: 0148/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 29, 2017
11 CORNELIUS PARKWAY -Humber River Watershed
The purpose is to construct a two storey single family dwelling with integral garage and rear
patio at 11 Cornelius Parkway in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57412 - Application #: 0179/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 30, 2017
69 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a second storey addition to the existing dwelling and a detached
garage in the rear yard at 69 Cynthia Road in the City of Toronto (Etobicoke York).
CFN: 57898 - Application #: 0597/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 12, 2017
18 DALLNER ROAD - Humber River Watershed
The purpose is to construct a replacement detached garage to the rear of the existing dwelling
at 18 Dallner Road in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58516 - Application #: 1090/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 2, 2017
i
TORONTO DISTRICT SCHOOL BOARD - Humber River Watershed
The purpose is to facilitate the placement of a replacement play area at Claireville Junior Public
School - 350 Silverstone Drive in the City of Toronto (Etobicoke York Community Council Area),
CFN: 57902 - Application #: 0605/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
184 HUMBERVALE BOULEVARD - Mimico Creek Watershed
The purpose is to construct a partial second storey addition, one -storey side (south) addition,
and a rear/side deck to the existing single family detached dwelling at 184 Humbervale
Boulevard in the City of Toronto (Etobicoke York).
CFN: 57122 - Application #: 0005/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 26, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
2487741 ONTARIO INC. - Don River Watershed
The purpose is to construct two outdoor soccer fields with seasonal enclosures (bubbles) and
formalize an existing gravel parking lot with curbs, asphalt, storm servicing and soft landscaping
at 101 Railside Road in the City of Toronto (North York Community Council Area).
CFN: 57911 - Application #: 0600/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 1, 2017
19 PITCAIRN CRESCENT - Don River Watershed
The purpose is to construct a rear deck to the existing one storey single family dwelling at 19
Pitcairn Crescent in the City of Toronto (North York Community Council Area).
CFN: 58505 - Application #: 1036/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 5, 2017
CITY OF TORONTO - Don River Watershed
The purpose is to excavate and install below grade a 200 mm pipe that is currently on the
surface that will permanently transfer ground water, originating from pumping wells within the
right-of-way on Graydon Hall Drive adjacent to the building at 18 Graydon Hall Drive, across
TRCA lands to a proposed energy dissipater/aerator/precipitator chamber and ultimately
discharge to the East Don River. The existing temporary ground water transfer pipe and energy
dissipater/aerator will be removed.
i
•
CFN: 56464 - Application #: 0909/16/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 21, 2017
48 WALLINGFORD ROAD - Don River Watershed
The purpose is to construct a replacement staircase and an extension to an existing deck at the
rear of a one and a half storey single family detached dwelling located at 48 Wallingford Road in
the City of Toronto (North York Community Council Area).
CFN: 58127 - Application #: 0794/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 12, 2017
17 GREEN VALLEY ROAD - Don River Watershed
The purpose is to construct a replacement deck on the existing footings, to the rear of an
existing one storey single family detached dwelling located at 17 Green Valley Road in the City
of Toronto (North York Community Council Area).
CFN: 58388 - Application #: 0987/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 12, 2017
66 ARJAY CRESCENT - Don River Watershed
The purpose is to construct a two storey replacement dwelling at 66 Arjay Crescent in the City
of Toronto (North York Community Council Area).
CFN: 57360 - Application #: 0145/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 6, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
273 BEECHGROVE DRIVE - Highland Creek Watershed
The purpose is to construct a two-storey replacement dwelling with associated landscaping at
273 Beechgrove Drive in the City of Toronto (Scarborough Community Council Area).
CFN: 57900 - Application #: 0595/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 5, 2017
i
HOLY CROSS HELLENIC CHURCH OF GENUINE ORTHODOX CHRISTIAN - Don River
Watershed
The purpose is to construct a replacement two storey church at 618 Birchmount Road in the
City of Toronto (Scarborough Community Council Area).
CFN: 57738 - Application #: 0446/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 25, 2017
78 RAVINE PARK CRESCENT - Waterfront Watershed
The purpose is to construct an addition in the rear south-west corner of the existing first floor, a
second storey addition, and a new attached deck to the rear of an existing one -storey single
family detached dwelling located at 78 Ravine Park Crescent in the City of Toronto
(Scarborough Community Council Area).
CFN: 58248 - Application #: 0844/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 5, 2017
81 MEADOWCLIFFE DRIVE - Waterfront Watershed
The purpose is to construct minor ground floor additions to the existing dwelling located at 81
Meadowcliffe Drive in Toronto (Scarborough Community Council Area).
CFN: 56563 - Application #: 1060/161TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 20, 2017
19 WHITE ABBEY PARK - Don River Watershed
The purpose is to construct a second storey addition above the existing footprint and new deck
to the rear of a one storey single family detached dwelling located at 19 White Abbey Park in the
City of Toronto (Scarborough Community Council Area).
CFN: 58477 - Application #: 1001/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
SOCIETY OF ST. VINCENT DE PAUL - Highland Creek Watershed
The purpose is to construct a one storey addition with basement, attached deck, ramp, and
patio to the rear of an existing one storey single family detached dwelling.
i
CFN: 58377 - Application #: 0964/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
39 BANMOOR BOULEVARD - Highland Creek Watershed
The purpose is to construct a one storey addition with associated balcony, to the rear of an
existing one storey single family detached dwelling located at 39 Banmoor Boulevard in the City
of Toronto (Scarborough Community Council Area).
CFN: 58384 - Application #: 0958/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 21, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
ACCOMMODATION INFORMATION AND SUPPORT INC. - Don River Watershed
The purpose is to construct a one storey addition to the rear of the existing three storey
apartment building at 58 Lewis Street in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 57213 - Application #: 0152/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 14, 2017
27 SOUTH DRIVE - Don River Watershed
The purpose is to construct an inground pool, terrace, wooden deck and reconstruct the
detached garage to the rear of the single family dwelling at 27 South Drive. This proposal also
includes a new two storey addition and basement walk -out to the rear of the existing dwelling.
CFN: 58489 - Application #: 1043/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 25, 2017
CITY OF TORONTO - Don River Watershed
The purpose is to construct a metal storage shed at 30 Northline Road, near Bermondsey Road
and Eglinton Avenue East, in Toronto. No in -water work is within the scope of this project.
CFN: 58260 - Application #: 0981/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: August 24, 2017
EASTERN STORAGE INC. - Don River Watershed
The purpose is to construct a new four storey building which will serve as a storage unit
warehouse on the vacant industrial lot at 459 Eastern Avenue in the City of Toronto (Toronto
and East York).
CFN: 57515 - Application #: 0309/171TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 19, 2017
73 GLEN DAVIS CRESCENT - Waterfront Watershed
The purpose is to construct a two storey addition to the rear of the existing semi detached
dwelling at 73 Glen Davis Crescent in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 57875 - Application #: 0546/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
902 EASTERN AVENUE - Don River Watershed
The purpose is to construct a second storey addition over the existing footprint and underpin the
existing basement of a single family detached dwelling located at 902 Eastern Avenue in the
City of Toronto (Toronto and East York Community Council Area).
CFN: 57919 - Application #: 0625/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 5, 2017
194 NEVILLE PARK BOULEVARD - Waterfront Watershed
The purpose is to construct a two and a half storey dwelling at 194 Neville Park Boulevard in the
City of Toronto (Toronto and East York Community Council Area).
CFN: 58383 - Application #: 0949/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: August 29, 2017
H • •
CITY OF VAUGHAN
BELL CANADA - Humber River Watershed
The purpose is to undertake relocation of a Bell conduit to facilitate the culvert extension for
VIVA Highway 7 widening project, west of Pine Valley Drive and east of Islington Avenue. The
works include breakout of an existing concrete structure and rebuilding of a new duct bank
above the newly placed culvert extension. The proposed relocation will be done in coordination
with H2 West culvert extension work under the VIVA application # 1036/16/VAUG. The warm
water construction timing window will be applied to this project.
CFN: 57041 - Application #: 0017/17NAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: September 20, 2017
CITY OF VAUGHAN - Don River Watershed
The purpose is to undertake replacement of a pedestrian bridge located, southwest of Dufferin
Street and Langstaff Road over the West Don River. The existing wooden pedestrian bridge will
be replaced with a new steel framed bridge on new abutments. The warmwater construction
timing window will apply to the works.
CFN: 57554 - Application #: 0470/17NAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: September 5, 2017
CITY OF VAUGHAN - Humber River Watershed
The purpose is to undertake rehabilitation of a playground located east of Islington Avenue,
south of Willis Road. The works will include expansion of an existing playground with new
equipment, accessible asphalt paving and pathways and expansion of an existing parking lot to
include an additional 18 asphalt parking spaces. The Ministry of Natural Resources and
Forestry (MNRF) Redside dace timing window will apply to the works unless otherwise specified
in writing by MNRF.
CFN: 57931 - Application #: 0608/171VAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: August 28, 2017
E W
REGIONAL MUNICIPALITY OF YORK - Humber River Watershed
The purpose is to construct a new culvert, install new bus shelters and reconstruct the
intersection at Highway 7 and Highway 27, near Plunketts Creek, in the City of Vaughan,
Humber River Watershed as located on the property owned by the Regional Municipality of
York. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace fisheries timing
window will apply to this project unless otherwise specified in writing by MNRF.
CFN: 55322 - Application #: 0073/16NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: August 23, 2017
REGIONAL MUNICIPALITY OF YORK - Humber River Watershed
The purpose is to replace four existing corrugated steel pipe (CSP) cross culverts with longer
culverts within the road right-of-way at Nashville Road - 511 m east of Albion Vaughan Road and
Nashville Road - 480m west of Huntington Road in the City of Vaughan; Warden Avenue -
222m north of Bethesda Sideroad in the Town of Whitch urch-StouffviIle; and at York -Durham
Line - 739m north of 16th Avenue, in the City of Markham. The Ministry of Natural Resources
and Forestry (MNRF) Redside Dace timing window will apply to these works, unless otherwise
specified in writing by MNRF.
CFN: 58148 - Application #: 0859/17NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: September 12, 2017
TEEFY DEVELOPMENTS LTD. / SENATOR DEVELOPMENTS INC. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate final grading and restoration plantings associated with a Townhouse
Development at the southwestern corner of Keele Street and Rutherford Road, in the City of
Vaughan.
CFN: 57816 - Application #: 0502/17NAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 29, 2017
TOWN OF AJAX
RIVERSIDE (BRISCOE) INC. - Duff ins Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Duffins Creek
Watershed in order to facilitate topsoil stripping, rough grading and the installation of an
infiltration gallery and subdrain to assist with site servicing for the Riverside Enclaves draft
approved residential plan of subdivision (S -A-2014-01), draft plan of condominium (C -A-2014-
02) and Site Plan (SP9/14).
CFN: 57174 - Application #: 0044/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 31, 2017
491
TOWN OF CALEDON
4180 BEECHGROVE SIDEROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new driveway, septic system and 187 sq.m
(2,020 sq.ft) addition to an existing dwelling, associated with a municipal building permit.
CFN: 57448 - Application #: 0221/171CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: August 30, 2017
5 PARK MEADOW DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 87.0 sq. m (936.5 sq. ft) one storey dwelling
addition, 14.9 sq. m. (160.4 sq. ft.) garage addition, upgrade to septic bed, and replacement of
patio stone area located at the rear of an existing residential dwelling associated with a
municipal building permit.
CFN: 58349 - Application #: 0920/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: September 22, 2017
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 519.5 sq. m (5,592 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58352 - Application #: 0929/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: August 29, 2017
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 574.6 sq. m (6,184 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58491 - Application #: 1031/171CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: September 14, 2017
492
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to undertake emergency work to replace a damaged culvert and to repair a sink
hole and crack along a trail and slope located off of Emil Kolb Parkway, south of Duffy's Lane, in
the Town of Caledon. This permit was reviewed in accordance with the TRCA Permission for
Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). Due to the
emergency nature of the work, no construction timing window will apply to this project.
CFN: 58482 - Application #: 1017/17/CAL
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: August 30, 2017
41 JANE STREET - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 55.7 sq. m. (600.4 sq. ft.) second storey
addition, 106.42 sq. m. (1,145.52 sq. ft.) two storey garage addition and asphalt driveway to the
existing residential dwelling associated with a municipal building permit.
CFN: 58397 - Application #: 0952/171CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: September 1, 2017
TARPA CONSTRUCTION CO. LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 42.4 sq. m (456.38 sq. ft.) temporary retail
structure with outdoor storage area for a commercial nursery and garden supply centre
associated with a municipal building permit application, municipal site plan application (Town
File No. SPA 15-0030) and municipal zoning by-law amendment application (Town File No. R2
12-08).
CFN: 58341 - Application #: 0908/171CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: September 12, 2017
TOWN OF RICHMOND HILL
49 WALMER ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 453 sq.m (4,876.5 sq. ft.) dwelling associated with a
municipal building permit.
CFN: 58531 - Application #: 1072/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: September 22, 2017
493
41 WALMER ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 453 sq.m (4,876.5 sq. ft.) dwelling associated with a
municipal building permit.
CFN: 58532 - Application #: 1071/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: September 22, 2017
TOWNSHIP OF KING
13275 DUFFERIN STREET - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 816 sq. m. replacement single family
dwelling, 97.5 sq. m. detached garage, sewage septic system and a new driveway, associated
with a municipal building permit. The subject property is located on lands known municipally as
13275 Dufferin Street, in the Township of King.
CFN: 58059 - Application #: 1023/17/KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 8, 2017
TOWNSHIP OF UXBRIDGE
2479 CONCESSION 4 ROAD - Duffins Creek Watershed
The purpose is to carry out site grading and construct a new two-storey single family detached
dwelling 2479 Concession Road 4 in the Township of Uxbridge. This proposal also includes the
installation of a new septic system, driveway extension and minor landscaping.
CFN: 58039 - Application #: 0684/17/UXB
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 19, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
i • i
CITY OF BRAMPTON
To undertake off-line stormwater management pond maintenance on 10610 Airport Road, just
north of Eagle Plains Drive, in the City of Brampton, Humber River Watershed as located on the
property owned by City of Brampton. The purpose is to undertake routine storm water
management pond maintenance including sediment removal on 10610 Airport Road, just north
of Eagle Plains Drive in the City of Brampton. The Redside Dace construction timing window will
be applied to this project unless otherwise specified in writing by the Ministry of Natural
Resources and Forestry (MNRF).
CFN: 57938 - Application #: 0761/171BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 18, 2017
CITY OF BRAMPTON
To undertake off-line stormwater management pond maintenance just east of Thorndale Road
and south of Eastbr000k Way, in the City of Brampton, Humber River Watershed as located on
the property owned by City of Brampton. The purpose is to undertake routine stormwater
management pond maintenance including sediment removal just east of Thorndale Road and
south of Eastbr000k Way in the City of Brampton. The Redside Dace construction timing
window will be applied to this project unless otherwise specified in writing by the Ministry of
Natural Resources and Forestry (MNRF).
CFN: 58315 - Application #: 0897/17/BRAM
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: September 19, 2017
CITY OF PICKERING
CITY OF PICKERING
To undertake road/pathway resurfacing or reconstruction along Bayly Street, from the West
Shore Community Centre to Begley Street, in the City of Pickering, Frenchman's Bay
Watershed, as located on property owned by the Regional Municipality of Durham. The
purpose is to reconstruct a multi -use path on the south side of Bayly Street, from the West
Shore Community Centre to Begley Street, in the City of Pickering. No in -water works are
associated with this project.
CFN: 58086 - Application #: 0771/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 22, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Brock Road near Usman Road, in the City of Pickering, Duffins Creek Watershed as located
on the property owned by the City of Pickering under a franchise agreement with Enbridge Gas
Distribution Inc. The purpose is to relocate an existing NPS 8 ST HP gas pipeline. No in -water
works are associated with this project.
CFN: 58164 - Application M 0977/17/PICK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 28, 2017
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -315.67-2017), located east of Brock Road and north of Taunton Road, in the
City of Pickering, Duffins Creek Watershed, as located on property owned by Hydro One
Network Inc. (HONI) and managed by Ontario Infrastructure and Lands Corporation (10). TNPI
is currently in the process of obtaining authorization from IO and will not begin work until
authorization is in place. The purpose is to undertake an integrity dig to conduct repairs on an
existing pipeline at a Trans -Northern Pipeline Inc. (TNPI) site (MP -315.67-2017), located east of
Brock Road and north of Taunton Road, in the City of Pickering. No in -water works are
associated with this project.
CFN: 57490 - Application M 0367/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 5, 2017
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -315.30-2017), located west of Sideline 16 and north of Taunton Road, in the
City of Pickering, Duffins Creek Watershed, as located on property owned by Hydro One
Network Inc. (HONI) and managed by Ontario Infrastructure and Lands Corporation (IO). TNPI
is currently in the process of obtaining authorization from IO and will not begin work until
authorization is in place. The purpose is to undertake an integrity dig to conduct repairs on an
existing pipeline at a Trans -Northern Pipeline Inc. (TNPI) site (MP -315.30-2017), located west of
Sideline 16 and north of Taunton Road, in the City of Pickering. No in -water works are
associated with this project.
CFN: 57685 - Application M 0364/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email lsotoudeh@trca.on.ca
Date: September 6, 2017
re •
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -316.07-2017), located west of Brock Road and north of Taunton Road, in the
City of Pickering, Duff ins Creek Watershed, as located on property owned by Hydro One
Network Inc. (HONI) and managed by Ontario Infrastructure and Lands Corporation (10). TNPI
is currently in the process of obtaining authorization from 10 and will not begin work until
authorization is in place. The purpose is to undertake an integrity dig to conduct repairs on an
existing pipeline at a Trans -Northern Pipeline Inc. (TNPI) site (MP -316.07-2017), located west of
Brock Road and north of Taunton Road, in the City of Pickering. The Redside Dace construction
timing window applies to this project unless otherwise specified in writing by the Ministry of
Natural Resources and Forestry (MNRF).
CFN: 57690 - Application #: 0444/171PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 5, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Beckett Avenue, Raven Road and Rustic Road in the City of Toronto (Etobicoke
York Community Council Area), Humber River Watershed as located on property owned by the
City of Toronto. The purpose is to place new service ducts. No in -water works are within the
scope of this project.
CFN: 56517 - Application #: 0959/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: September 8, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on North Drive, Woodcrest Drive, Edenbridge Drive, Knoll Drive, 220 Edenbridge Drive, 3
Taylorwood Drive, 10 Knoll Drive, 9 Knoll Drive, 11 Knoll Drive and 15 Knoll Drive, near Eglinton
Avenue West and Scarlett Road, in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on City of Toronto -owned property and privately -
owned property. The purpose is to install conduit. No in -water work is within the scope of this
project.
CFN: 57673 - Application #: 0704/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: September 11, 2017
497
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Kipling Avenue, south of Lakeland Drive, in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed as located on property owned by the City of Toronto.
The purpose is to install conduit and a vault. No in -water work is within the scope of this project
CFN: 58262 - Application #: 1021/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: September 7, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on (2585 Jane Street, located east of Jane Street and south of Sheppard Avenue), in
the City of Toronto (North York Community Council Area), Humber River Watershed as located
on the property owned by private landowners to whom Enbridge Gas Distribution Inc. is required
to maintain natural gas service as per the Ontario Energy Board and Public Utilities Act. The
purpose is to install a NPS 2 PE IP gas main to replace an old service. No in -water works are
associated with this project.
CFN: 57730 - Application #: 0426/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 5, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Eastern Avenue and Lewis Street in the City of Toronto (Toronto and East York Community
Council Area), Don River Watershed as located on property owned by the City of Toronto. The
purpose is to install new ducts. No in -water works are within the scope of this project.
CFN: 56508 - Application #: 1062/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: September 1, 2017
H T1 .
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on O'Connor Drive and Woodbine Avenue, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to install conduit and grade level boxes. No in -water work is within the
scope of this project.
CFN: 58254 - Application #: 0860/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: September 27, 2017
CITY OF VAUGHAN
ALECTRA UTILITIES
To undertake utility pole installation on Highway 7, east of Highway 400, along Highway 7 from
Bathurst Street to Yonge Street and along Bathurst Street, from Worth Boulevard to
Summeridge Drive, in the City of Vaughan and the Town of Richmond Hill, Humber River
Watershed as located on the property owned by Regional Municipality of York The purpose is
to undertake relocation of hydro -poles on Highway 7, east of Highway 400, along Highway 7
from Bathurst Street to Yonge Street and along Bathurst Street, from Worth Boulevard to
Summeridge Drive. The new poles will be installed using the Vac -System technique with
backfill. The relocation are required for the road widening to accommodate VIVA Bus Rapid
Transit (BRT) project.
CFN: 58123 - Application #: 0784/17NAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: August 31, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing road right
- of -way (ROW) on Glen Shields Avenue, Riviera Drive, Southern Hills Road and Cherry Hills
Road, near Dufferin Street and Steeles Avenue West, in the City of Vaughan, Don River
Watershed as located on property owned by the City of Vaughan. The purpose is to undertake
Bell service upgrades including installation of underground conduit using trench and trenchless
methods along the road right of way (ROW). There are no in -water works within the scope of
this project.
CFN: 55467 - Application #: 0232/16NAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 2, 2017
E • •
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing road right
- of -way (ROW) on Draper Boulevard, White Boulevard, Jaimie Road, Haley Court and
Brownridge Drive, near Dufferin Street and Centre Street, in the City of Vaughan, Don River
Watershed as located on the property owned by the City of Vaughan. The purpose is to
undertake Bell service upgrades including installation of underground conduit using trench and
trenchless methods along the ROW. There are no in -water works within the scope of this
project.
CFN: 55521 - Application #: 0331/16/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 2, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the
north side of Major Mackenzie Drive between Baron Street and the Canadian Pacific Rail tracks,
in the City of Vaughan, Humber River Watershed as located on the property owned by Regional
Municipality of York, under a franchise agreement with Enbridge Gas Distribution Inc. The
purpose is to install a NPS 8 PE IP gas pipeline crossing a watercourse. The warmwater
construction timing window applies to this project.
CFN: 58152 - Application #: 0884/17/VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 1, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Pine Grove Road, east of Islington Avenue, in the City of Vaughan, Humber River Watershed
as located on the property owned by the City of Vaughan under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas main in order to
service a new residential townhome complex. No in -water works are associated with this
project.
CFN: 58156 - Application #: 0915/17/VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 14, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the road allowances
of future residential streets, located east of Pine Valley Drive and north of Major Mackenzie
Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by
the City of Vaughan under a franchise agreement with Enbridge Gas Distribution Inc. The
purpose is to install a NPS 2 PE IP gas pipeline in order to service a new subdivision. No in -
water works are associated with this project.
500
CFN: 58165 - Application M 0978/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 14, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the future road
allowances of Ballantyne Boulevard, Brant Drive, and Winthrop Circle, located west of Pine
Valley Drive and south of Teston Road, in the City of Vaughan, Humber River Watershed as
located on the property owned by the City of Vaughan under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 4 PE IP gas pipeline in order to
service a new subdivision. No in -water works are associated with this project.
CFN: 58168 - Application M 0973/171VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 14, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Greville Street, Adario Circle, Heathcote Road, and Costain Circle, located west of Pine
Valley Drive and south of Teston Road, in the City of Vaughan, Humber River Watershed as
located on property owned by the City of Vaughan under a franchise agreement with Enbridge
Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas pipeline in order to service a
new subdivision. No in -water works are associated with this project.
CFN: 58425 - Application M 1014/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 14, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within the future road
allowances of Pine Heights Drive, Sophies Court, and Purple Creek Road located east of Pine
Valley Drive and south of Teston Road, in the City of Vaughan, Humber River Watershed as
located on property owned by the City of Vaughan under a franchise agreement with Enbridge
Gas Distribution Inc. The purpose is to install a NPS 4 PE IP gas pipeline in order to service a
new subdivision. No in -water works are associated with this project.
CFN: 58426 - Application M 1015/17NAUG
Report Prepared by: Grace Conte, extension 5271, email gconte@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 14, 2017
501
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within the future road
allowances of Workmen's Circle and Larkinley Lane, north of Rossland Road and east of
Church Street, in the Town of Ajax, Duffins Creek Watershed as located on the property owned
by the Town of Ajax under a franchise agreement with Enbridge Gas Distribution Inc. The
purpose is to install a NPS 4 PE IP gas pipeline in order to service a new subdivision. No in -
water works are associated with this project.
CFN: 58169 - Application #: 0976/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 12, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Lakeview Boulevard, west of Maple Avenue and near Waterfront Trail, in the Town
of Ajax, Carruthers Creek Watershed as located on the property owned by the Town of Ajax
under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to excavate a pit
in order to cap and abandon an existing natural gas pipeline. No in -water works are associated
with this project.
CFN: 58438 - Application #: 1057/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 28, 2017
TOWN OF AJAX
To undertake road/pathway resurfacing or reconstruction along Duffins Trail, located east of
Church Street under the Highway 401/ Canadian National Railway (CNR) overpass, in the Town
of Ajax, Duffins Creek Watershed as located on property owned by the Town of Ajax, Ministry of
Transportation and Canadian National Railway (CNR). The purpose is to rehabilitate Duffins
trail, located east of Church Street and under the Highway 401 and Canadian National Railway
(CNR) overpass, in the Town of Ajax. The warm water construction timing window applies to
this project.
CFN: 58084 - Application #: 0742/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 22, 2017
502
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -314.33-2017), located south of Concession Road 5 and east of Church Street
North, in the Town of Ajax, Duffins Creek Watershed, as located on property owned by the
Toronto and Region Conservation Authority under management agreement with the Town of
Ajax. The purpose is to undertake an integrity dig to conduct repairs on an existing pipeline at a
Trans -Northern Pipeline Inc. (TNPI) site (MP -314.33-2017), located south of Concession Road
5 and east of Church Street North, in the Town of Ajax. The cold water construction timing
window will apply to the project.
CFN: 57489 - Application #: 0369/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 6, 2017
TOWN OF CALEDON
REGIONAL MUNICIPALITY OF PEEL
To undertake sewer, watermain, utility installation or maintenance within an existing roadway
along Simcoe Street, from Airport Road to Holmes Drive, in the Town of Caledon, Humber River
Watershed as located on property owned by the Town of Caledon. The purpose is to replace a
150 mm diameter watermain along Simcoe Street, from Airport Road to Holmes Drive, in the
Town of Caledon. No in -water work is associated with this project.
CFN: 58090 - Application #: 0907/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 28, 2017
TOWN OF CALEDON
To undertake road/pathway resurfacing or reconstruction on Palmer Circle, Scott Road and
Waterway Court, in the Town of Caledon, Humber River Watershed as located on property
owned by the Town of Caledon. The purpose is to undertake rehabilitation works on Palmer
Circle, Scott Road and Waterway Court, in the Town of Caledon. The warm water construction
timing window applies to this project.
CFN: 58091 - Application #: 0886/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: September 15, 2017
503
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology within
the road allowance on the east side of Yonge Street, from approximately Devonsleigh
Boulevard to Bernard Avenue, in the Town of Richmond Hill, Rouge River Watershed as located
on the property owned by the Town of Richmond Hill, under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install a NPS 8 ST DFBE HP gas pipeline
crossing beneath a watercourse. The Redside Dace fisheries timing window applies to this
project, unless otherwise specified in writing by the Ministry of Natural Resources and Forestry.
CFN: 58162 - Application #: 0962/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 1, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Devonsleigh Boulevard near Corso Court, in the Town of Richmond Hill, Rouge River
Watershed as located on the property owned by the Town of Richmond Hill, under a franchise
agreement with Enbridge Gas Distribution Inc., and on property owned by a private landowner
to whom Enbridge Gas Distribution Inc. is providing service. The purpose is to install a NPS 2
PE IP gas header service and abandon an existing gas main. The Redside Dace fisheries
timing window will apply to this project, unless otherwise stated in writing by the Ministry of
Natural Resources and Forestry.
CFN: 58170 - Application #: 0974/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: September 1, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
6 BLAKETON COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on, 6 Blaketon
Court, in the City of Brampton, Humber River Watershed.
504
CFN: 58533 - Application #: 1070/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: September 20, 2017
CITY OF PICKERING
1414 OLD FOREST ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) on Part Lot 31, Concession III, (1414 Old Forest Road), in
the City of Pickering, Petticoat Creek Watershed.
CFN: 58496 - Application M 1051/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 19, 2017
1831 FAIRPORT ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 101, Plan
1051, (1831 Fairport Road), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58586 - Application #: 1114/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 28, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
10106640 CANADA CORPORATION
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Lot
34, Plan 789, (62 East Drive), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed as located on the property owned by 10106640 Canada Corporation.
CFN: 58583 - Application #: 1128/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 21, 2017
2344498 ONTARIO INC.
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 23, Plan 4301, (30 Edenbrook Hill), in
the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.
505
CFN: 58411 - Application #: 0999/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 30, 2017
136 HADRIAN DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) on Lot 3, Plan 4106, (136 Hadrian Drive), in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 58526 - Application #: 1064/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
297 RIVERSIDE DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 15, Plan
M447, (297 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 58564 - Application #: 1099/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 21, 2017
103 BANKVIEW CIRCLE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) and change the
use, size, or number of dwelling units of a structure, or undertake work that does not change the
footprint of the existing structure on Lot 51, Plan 66M-6324, (103 Bankview Circle), in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 58495 - Application #: 1053/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 5, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
125 CITATION DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 153, Plan
M-676, (125 Citation Drive), in the City of Toronto (North York Community Council Area), Don
River Watershed.
506
CFN: 58379 - Application #: 0946/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 22, 2017
97 ALAMOSA DRIVE
To construct a ground floor addition up to 50 sq. m (538 sq. ft.) on Lot 5, Plan M-786, (97
Alamosa Drive), in the City of Toronto (North York Community Council Area), Don River
Watershed.
CFN: 58590 - Application #: 1126/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 28, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
7 BIRCHMOUNT ROAD
To construct a ground floor addition up to 50 sq. m (538 sq. ft.) on Lot 33, 34, Plan 975, (7
Birchmont Road), in the City of Toronto (Scarborough Community Council Area), Waterfront
Watershed.
CFN: 58484 - Application #: 1008/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 6, 2017
30 BLAKEMANOR BOULEVARD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 53, Plan M-716, (30 Blakemanor
Boulevard), in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed.
CFN: 58524 - Application #: 1048/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 8, 2017
507
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
1108 EDGEWOOD AVENUE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part 2 Lot
25, Plan 66R-26116, (1106 Edgewood Avenue), in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed.
CFN: 57512 - Application #: 0274/171T OR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 11, 2017
124 FERRIS ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) on Lot 2, 3, Plan M630, (124 Ferris Road), in the City of
Toronto (Toronto and East York Community Council Area), Don River Watershed.
CFN: 58579 - Application #: 1144/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 25, 2017
66 NESBITT DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) and construct a ground floor addition up to 50 sq. m (538
sq. ft.) on Lot 24, 25, Plan 2398, (66 Nesbitt Drive), in the City of Toronto (Toronto and East
York Community Council Area), Don River Watershed.
CFN: 57786 - Application #: 0512/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: August 30, 2017
CITY OF VAUGHAN
51 HOPEWELL STREET
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 76, Plan
65M-4374, (51 Hopewell Street), in the City of Vaughan, Humber River Watershed.
CFN: 58565 - Application #: 1108/17/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: September 26, 2017
We
I GATE HOUSE COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 10, Plan 65M-3059, (1 Gate House
Court), in the City of Vaughan, Humber River Watershed.
CFN: 57975 - Application M 1160/17NAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: October 2, 2017
149 TWIN HILL CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 18, Plan 65M-4111, (149
Twin Hill Crescent), in the City of Vaughan, Humber River Watershed.
CFN: 58540 - Application M 1083/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Polina Bam, extension 5256, email polina.bam@trca.on.ca
Date: September 21, 2017
326 GLENKINDIE AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 63, Plan 65,
Lot 63, Plan 65M-3022, (326 Glenkindie Avenue), in the City of Vaughan, Don River Watershed.
CFN: 58518 - Application M 1091/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 13, 2017
198 VANDA DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 46, Plan
65M4016, (198 Vanda Drive), in the City of Vaughan, Don River Watershed.
CFN: 58539 - Application M 1082/171VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 15, 2017
LOUJO II HOLDINGS INC. AND MANNETO HOLDINGS CAN INC.
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on , (675 Rivermede Road), in the City of
Vaughan, Don River Watershed as located on the property owned by Loujo II Holdings Inc. and
Manneto Holdings Can Inc..
509
CFN: 58651 - Application #: 1152/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 29, 2017
20 CLAIREWOOD COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft.) on Part Lot 20, Concession 8 Lot 3, Plan 65M-4177, (20
Clairewood Court), in the City of Vaughan, Humber River Watershed.
CFN: 58483 - Application #: 1005/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: September 6, 2017
51 BELSITE COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 31,
Concession 8, (51 Belsite Court), in the City of Vaughan, Humber River Watershed.
CFN: 58541 - Application #: 1098/17/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: September 26, 2017
TOWN OF AJAX
115 FEINT DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 45, Plan
40M2285, (115 Feint Drive), in the Town of Ajax, Duff ins Creek Watershed.
CFN: 58481 - Application #: 1010/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
step han i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: September 8, 2017
TOWN OF CALEDON
12599 CENTREVILLE CREEK ROAD
To undertake a municipal or utility project on North West Half Lot 3, Concession 3, 12599
Centreville Creek Road, in the Town of Caledon, Humber River Watershed.
510
CFN: 58488 - Application M 1037/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 31, 2017
30 CEDAR ALLAN PLACE
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft.) on Lot 8, Plan 43M-1837, 30 Cedar Allan Place, in the Town of Caledon, Humber
River Watershed.
CFN: 58486 - Application #: 1028/171CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: August 31, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
20 WILDERNESS TRAIL
To install a swimming pool on Lot 8, Plan 65M-2841, (20 Wilderness Trail), in the Town of
Whitch urch-Stouffville, Rouge River Watershed.
CFN: 58507 - Application #: 1052/17NVS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: September 5, 2017
TOWNSHIP OF KING
28 ASPEN KING COURT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Part Lot 8, Concession 8, (28
Aspen King Court), in the Township of King, Humber River Watershed.
CFN: 58654 - Application #: 1149/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: October 2, 2017
114 BURNS BOULEVARD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on, (114 Burns
Boulevard), in the Township of King, Humber River Watershed.
CFN: 58490 - Application M 1042/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: August 30, 2017
511
43 LAVENDER VALLEY ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 33, Plan
65M-4296, (43 Lavender Valley Road), in the Township of King, Humber River Watershed.
CFN: 58581 - Application #: 1122/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 22, 2017
14 KERI COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on , (14 Keri Court), in the Township of
King, Humber River Watershed.
CFN: 58515 - Application #: 1079/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 13, 2017
83 CHUCK ORMSBY CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft.) on Lot 18, Plan 65M-4298, (83
Chuck Ormsby Crescent), in the Township of King, Humber River Watershed.
CFN: 58534 - Application #: 1069/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: September 11, 2017
PERMIT APPLICATIONS 10.9 AND 10.10 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
512
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
10.9 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
and alter a watercourse, along Mimico Creek, from west of Kipling Avenue to north of
Dundas Street West, in the City of Toronto (Etobicoke York Community Council Area),
Mimico Creek Watershed, as located on property owned by the City of Toronto and the
Islington Golf Club. The purpose is to rehabilitate an existing sanitary trunk sewer.
Works will involve relining the trunk sewer and construction of access routes to each
maintenance chamber. The warm water construction timing window of July 1 to March
31 will apply to this proposal.
CFN: 56507 - Application #: 1063/16/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Daniel Brent 5774 dbrent@trca.on.ca
Date: October 5, 2017
CITY OF VAUGHAN
10.10 69 ARRAN CRESCENT
To construct, reconstruct, erect or place a building or structure and temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere on
Part Lot 7, Concession 8, (69 Arran Crescent), in the City of Vaughan, Humber River
Watershed. The purpose is to undertake works within TRCA's Regulated Area of the
Humber River Watershed in order to facilitate the construction of a 32.70 sq.m. ( 351.98
sq.ft.) in -ground pool, replacement patio, and 0.3 metre (12 inch) tall retaining wall
associated with a municipal building permit. The subject property is known municipally
as 69 Arran Crescent in the City of Vaughan.
CFN: 58478 - Application #: 0996/17NAUG
Report Prepared by: Polina Barn 5256 polina.bam@trca.on.ca
For information contact: June Little 5756 jlittle@trca.on.ca
Date: October 12, 2017
513
TERMINATION
ON MOTION, the meeting terminated at 9:44 a.m., on Friday, October 13, 2017.
Maria Augimeri
Chair
/ks
514
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #9/17 was held at TRCA Head Office, on Friday, November
3, 2017. The Chair Maria Augimeri, called the meeting to order at 9:31 a.m.
PRESENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Jennifer Innis
Member
Mike Mattos
Member
Anthony Perruzza
Member
PRESENT VIA TELECONFERENCE
Jennifer McKelvie Member
ABSENT
Glenn De Baeremaeker Member
Chris Fonseca Member
Brenda Hogg Member
Colleen Jordan Member
RES.#B98/17 - MINUTES
Moved by: Mike Mattos
Seconded by: Jack Ballinger
THAT the Minutes of Meeting #8/17, held on October 14, 2017, be approved.
CARRIED
515
Section I — Items for Authority Action
RES.#11399/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Duff ins Creek Watershed
Cougs (Workman's) Ltd., CFN 56096. Acquisition of property located east
of Church Street North and north of Rossland Road West, in the Town of
Ajax, Regional Municipality of Durham, under the "Greenlands Acquisition
Project for 2016-2020," Flood Plain and Conservation Component, Dufflna
Creek watershed.
Moved by: Jack Ballinger
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 11.2 hectares (27.8 acres), more or
less, of vacant land, located east of Church Street North and north of Rossland Road
West, said land being Part of Lot 14, Concession 3, designated Parts 1-4 on 40R-8952 Save
And Except Part 1 On Plan 40R-24996 and Save And Except Part 1 on draft -M -Plan by J.D.
Barnes Limited, Reference No. 14-25-888-05, dated September 28, 2017; and Blocks 4-5 on
draft M -Plan by J.D. Barnes Limited, Reference No.14-25-888-03, dated September 15,
2017, in the Town of Ajax, Regional Municipality of Durham, be purchased from Cougs
(Workman's) Ltd.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Ian McCullough, Vice President of Land Development,
Coughlan Homes, acting as agent for the owner.
Access to the subject lands will be achieved through its frontage on Church Street North.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Duffins Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Plan of Subdivision 18T-95036, TRCA staff established the limits of the open
space land.
516
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive Program,
it would appear that the subject property should be eligible for a tax exemption. While it is
expected that the subject parcel of land will not significantly impact TRCA's maintenance costs at
this location, an assessment of the aggregate acquisitions in the area will be undertaken and the
results will be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(a).trca.on.ca, jtruesdell a&.trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Jae Truesdell, extension 5247
Emails: ewong(aDtrca.on.ca, jtruesdell(aDtrca.on.ca
Date: October 13, 2017
Attachments: 1
517
Subject
to reek
Property �y
s ire
�a
v
0
000�
J ,
Legend 1,1
�i Toronto and Region
%_W Conservation
for The Living City
PEEL
tax. 0n.—
RES.#B100/17 - REQUEST FOR EXCHANGE OF TORONTO AND REGION
CONSERVATION AUTHORITY -OWNED LAND
Flood Plain and Conservation Component, Humber River Watershed
Davpart Inc., CFN 56150. An exchange of land located west of Keele
Street and south of Sheppard Avenue West, municipally known as 111-117
Whitburn Crescent, in the City of Toronto, under the "Greenlands
Acquisition Project for 2016-2020," Flood Plain and Conservation
Component, Humber River watershed.
Moved by: Jack Heath
Seconded by: Vincent Crisanti
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from Davpart Inc. for TRCA to
enter into an exchange of lands with Davpart Inc., the owner of 111-117 Whitburn
Crescent, City of Toronto, in order to resolve an existing encroachment on the adjacent
TRCA-owned lands;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with Davpart Inc., in this
instance and proceed with the land exchange;
THEREFORE LET IT BE RESOLVED THAT TRCA enter into an exchange of lands with
Davpart Inc. on the following basis:
Davpart Inc. will convey to TRCA a parcel of land containing 0.035 hectares (0.09
acres), more or less, of vacant valley lands, located west of Keele Street and south
of Sheppard Avenue West, said land being Part Block 1, PL 4503 North York as in
TB215629; designated as Part 1 on sketch created on May 13, 2016 by
MacNaughton Hermsen Britton Clarkson Planning Limited, municipally known as
117 Whitburn Crescent, in the City of Toronto;
2. TRCA will convey to Davpart Inc. a parcel of land containing 0.02 hectares (0.06
acres), more or less, of table lands with existing parking spaces, located west of
Keele Street and south of Sheppard Avenue West, said land being Part Block 1, PL
4503 North York as in NY666347; designated as Part 2 on sketch created on May 13,
2016 by MacNaughton Hermsen Britton Clarkson Planning Limited, municipally
known as 1651 Sheppard Avenue West, in the City of Toronto;
THAT TRCA receive consideration in the sum of $275,880.00; all legal, survey and other
costs to be paid by Davpart Inc.;
THAT TRCA receive conveyance of the land free from encumbrance, subject to existing
service easements;
THAT Davpart Inc., is to fully indemnify TRCA from any and all claims from injuries,
damages or costs of any nature resulting in any way, either directly or indirectly, from this
exchange;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by Davpart Inc.;
519
THAT said conveyance be subject to the approval of the Minister of Natural Resources
and Forestry in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
The proposed land exchange would involve the transfer of TRCA lands municipally known as
1651 Sheppard Avenue West in the City of Toronto, that have been developed by Davpart Inc.
with parking spaces (existing), and in exchange Davpart Inc. is proposing to convey a portion of
land at the rear of 117 Whitburn Crescent which is undeveloped and predominantly valley lands
as well as pay consideration in the sum of $275,880.00.
The subject TRCA-owned lands were acquired from D.B. Goodman, on January 13, 1960 under
the W.C.-12 Black Creek Water Control Project.
Negotiations have been conducted with Neil Robinson, Manager, acting as agent for the owners
Carmen Colafella.
Access to the subject lands will be achieved through its frontage on Sheppard Avenue West
Attached is a plan showing the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020.
An analysis of the proposed exchange was conducted by a third party, MHBC Planning, Urban
Design & Landscape Architecture on behalf of Davpart Inc. After a thorough exploration of
relocating the parking spaces elsewhere within Davpart Inc. owned lands it was concluded that
there was no other suitable location on the site for the parking.
It is TRCA staff opinion that the proposed exchange and consideration is beneficial to both
parties.
The market value of the lands to be exchanged is based on an appraisal prepared by D. Bottero
and Associates Limited on October 19, 2016 as well as an appraisal prepared by Wagner,
Andrews, Kovac Ltd. on November 21, 2016.
TAXES AND MAINTENANCE
The parcel of land that is conveyed to TRCA will be turned over to the City of Toronto under the
terms of the existing management agreement.
520
FINANCIAL DETAILS
All expenses related to this land exchange are to be paid by Davpart Inc.
Report prepared by: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(cDtrca.on.ca, jtruesdell(aDtrca.on.ca
For Information contact: Brandon Hester, extension 5767, Jae Truesdell, extension 5247
Emails: bhester(a.trca.on.ca, jtruesdell(a)trca.on.ca
Date: October 17, 2017
Attachments: 1
521
\ \ Area to be
Received
400
F `
D
CD
Area to be ���
Transferred
i
J � �
� l
SKlpTO
Legend
Toronto and Region
Conservation
® for The Living City
L�
D
. 91
Lad
L,
Section II — Items for Executive Action
RES.#6101/17 - BLACK CREEK PIONEER MILL POND CLEAN-OUT AND
RESTORATION PROJECT
Award of Contract #10006384 for the Disposal of Stockpiled Sediments.
Black Creek Pioneer Mill Pond will be dredged mechanically to remove
sediment that is inhibiting the operations of the mill at Black Creek Pioneer
Village and negatively impacting Black Creek downstream of the pond.
Accumulated sediment will need to be hauled and disposed of using a
contractor operating under a Ministry of the Environment and Climate
Change Environmental Compliance Approval.
Moved by: Anthony Perruzza
Seconded by: Mike Mattos
THAT Contract #10006384 for the disposal of industrial/commercial pond dredgeate for
Black Creek Pioneer Mill Pond, in the City of Toronto, be awarded to Ground Force
Environmental Inc. for a total cost not to exceed $117,674.40, plus HST, it being the lowest
bid meeting Toronto and Region Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 15%
of the total cost of the contract as a contingency allowance, if deemed necessary;
AND FURTHER THAT authorized TRCA staff be directed to take the action necessary to
implement the contract including obtaining any approvals and the signing and execution
of documents.
CARRIED
BACKGROUND
TRCA has over 35 years of experience in the planning, design, construction, maintenance and
monitoring of stormwater management pond (SWMP) projects. TRCA is ideally suited to carry out
pond maintenance for the Black Creek Pioneer Village (BCPV) pond because of the full range of
services and experience that can be offered internally including plan design, approvals, survey,
public consultation, implementation and site restoration.
Black Creek Pioneer Mill Pond, located south east of Steeles Avenue and Jane Street, within the
boundaries of BCPV, is approximately .20 ha in size and drains to Black Creek. Due to years of
sedimentation it has reached its capacity where the accumulated sediment needs to be dredged
to improve function of the mill, as well as, the general aesthetics and historical/heritage value of
Black Creek Pioneer Village. Cleaning out this pond will improve the thermal and sediment
loading impacts to Black Creek downstream of the Black Creek Pioneer Mill Pond. The sediment
was tested and meets industrial/commercial Ministry of the Environment and Climate Change
(MOECC) guidelines.
523
As part of the scope of work for this project, the industrial/commercial sediment accumulated in
Black Creek Pioneer Mill Pond will be dredged, stockpiled and mixed with a polymer to make it
easy to handle with machinery and taken off-site for disposal. The polymer is food grade and safe
for use in aquatic environments. It has been used on multiple occasions by TRCA throughout the
jurisdiction. Once the character of the sediment becomes like that of wet -cement, it is loaded into
tri -axles for off-site hauling to an MOECC approved disposal facility operating with an
Environmental Compliance Approval (ECA). In addition, a water control structure will be installed
within the pond outlet to allow for increased water retention and improved water management
within the pond.
TRCA estimated that there is an accumulation of up to 1,000 m3 of sediment to be removed from
Black Creek Pioneer Mill Pond.
RATIONALE
The Request for Tender (RFT) #10006384 was publically advertised on the electronic
procurement website www.biddingo.com on October 20, 2017 for the haulage and disposal of
industrial/commercial sediment material from Black Creek Pioneer Mill Pond. The document was
downloaded for review by 20 vendors.
The quotations were received on October 27, 2017 and formally opened by TRCA staff (Lisa
Moore, Judith Reda and Ryan Bolton) on the same day with the following results:
The two bids received were evaluated and scored based on the bidder's price and has
determined that the lowest bid is of reasonable value and also meets the requirements and
deliverables as outlined on the contract documents. Ground Force Environmental Inc. is capable
of undertaking the scope of work. In addition, this vendor has worked successfully with TRCA in
the past for similar types of contracts.
Based on the bids received, staff recommends that Ground Force Environmental Inc. be awarded
Contract #10006384 for the disposal of stockpiled sediments at Black Creek Pioneer Mill Pond at
BCPV for a total cost not to exceed $117,674.40 plus 15% contingency to be expended as
authorized by TRCA staff, plus HST.
This project is consistent with TRCA's Strategic Plan, specifically strategy #2 manage our
regional water resources for current and future generations.
FINANCIAL DETAILS
The costs for Contract #10006384 are 100 % recoverable from the City of Toronto in account
107-24.
DETAILS OF WORK TO BE DONE
Black Creek Pioneer Mill Pond will be dredged mechanically and restored upon completion. Only
contractors operating under an MOECC ECA are eligible to undertake the disposal of the
industrial/commercial sediment.
524
Total
Bidders
(Plus HST)
Loc -Pave Construction Inc.
$125,500.00
Ground Force Environmental Inc.
$117,674.40
The two bids received were evaluated and scored based on the bidder's price and has
determined that the lowest bid is of reasonable value and also meets the requirements and
deliverables as outlined on the contract documents. Ground Force Environmental Inc. is capable
of undertaking the scope of work. In addition, this vendor has worked successfully with TRCA in
the past for similar types of contracts.
Based on the bids received, staff recommends that Ground Force Environmental Inc. be awarded
Contract #10006384 for the disposal of stockpiled sediments at Black Creek Pioneer Mill Pond at
BCPV for a total cost not to exceed $117,674.40 plus 15% contingency to be expended as
authorized by TRCA staff, plus HST.
This project is consistent with TRCA's Strategic Plan, specifically strategy #2 manage our
regional water resources for current and future generations.
FINANCIAL DETAILS
The costs for Contract #10006384 are 100 % recoverable from the City of Toronto in account
107-24.
DETAILS OF WORK TO BE DONE
Black Creek Pioneer Mill Pond will be dredged mechanically and restored upon completion. Only
contractors operating under an MOECC ECA are eligible to undertake the disposal of the
industrial/commercial sediment.
524
TRCA will execute the contract, including: management of the awarded disposal contractor on
site, certification of each load leaving the site, issuance of bills of lading to each truck, verification
of the disposal site's MOECC ECA, and random checks to follow trucks from dredging site to
disposal site. These activities ensure the chain of custody of the dredged sediment from the
SWMP to the licensed disposal site operating under an MOECC ECA.
Dredging is tentatively scheduled to commence in November at Black Creek Pioneer Mill Pond,
upon receipt of all approvals and the availability of resources. Black Creek Pioneer Mill Pond will
be de -watered during the dredging, and will be managed to ensure the pond is providing
stormwater management function during this time period.
Report prepared by: Natalie Hryshko, extension 5889, Danielle Dellandrea, extension 5240
Emails: nhryshko(cDtrca.on.ca, ddellandrea(cDtrca.on.ca
For Information contact: John Stille extension 5396, John DiRocco extension 5231,
Ryan Bolton, extension 5950
Emails: jstille(aDtrca.on.ca, jdirocco(aDtrca.on.ca, rbolton(aD-trca.on.ca
Date: October 17, 2017
525
Section IV — Ontario Regulation 166/06, As Amended
RES.#6102/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Jennifer Innis
Seconded by: Vincent Crisanti
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 and 10.3 —10.6, which are listed below.
CARRIED
PERMIT APPLICATION 10.1 IS A MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF VAUGHAN
10.1 813229 ONTARIO LTD.
To change a building or structure so that it alters its use or potential use, increases its
size or increases the number of dwelling units and site grade on Part Lot 19, Concession
8, (9732 Highway 27), in the City of Vaughan, Humber River Watershed as located on
the property owned by 813229 Ontario Ltd. The purpose is to permit development within
a Regulated Area of the Humber River Watershed to facilitate minor grading works and
interior and exterior modification and renovations to an existing restaurant (formerly the
Salty Dawg) at 9732 Highway No. 27, in the City of Vaughan. The grading works include
a new septic system as well as a comprehensive planting plan which includes new trees
and shrubs.
CFN: 58722 - Application #: 1212/17/VAUG
Report Prepared by: Mark Andrews 5936 mandrews@trca.on.ca
For information contact: June Little 5756 jlittle@trca.on.ca
Date: October 25, 2017
526
RES.#B103/17 - STANDARD DELEGATED PERMITS
Moved by: Jennifer Innis
Seconded by: Vincent Crisanti
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.2 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years of less.
CITY OF MARKHAM
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake restoration of a section of eroded Robinson creek bank, south of
Old Wellington Road, west of Markham Road. The proposed works will include construction of
cortex weirs and vegetated layering to stabilize eroding stream banks and channel down cutting
in order to protect an existing sanitary line that crosses underneath Robinson Creek. The
Ministry of Natural Resources and Forestry(MNRF) Redside dace timing window applies, unless
otherwise specified in writing by MNRF.
CFN: 57945 - Application #: 0740/17/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: October 20, 2017
104 BERNBRIDGE ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of a walkout basement entrance and staircase located at
the rear of the existing single family dwelling.
CFN: 58710 - Application #: 1196/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: October 10, 2017
527
REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed
The purpose is to construct a salt management facility at 10990 Warden Avenue in the City of
Markham.
CFN: 58460 - Application #: 1171/17/MARK
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: October 4, 2017
22 ROUGE STREET - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to in order to facilitate the construction of a 356.06 sq. m. (3832.60 sq. ft.) two-storey
replacement dwelling and a 28.71 sq. m. (309.10 sq. ft.) wooden deck on the subject property.
CFN: 58570 - Application #: 1112/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: October 18, 2017
10 COUNTRY ESTATES DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area to facilitate the construction
of a two-storey dwelling, deck, gazebo, swimming pool and basketball court on the subject
property.
CFN: 57632 - Application #: 0454/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: October 16, 2017
CITY OF PICKERING
WOODVIEW LAND DEVELOPMENT CORPORATION - Petticoat Creek Watershed
The purpose is to carry out topsoil stripping and rough grading for purposes of constructing a
new public roadway and associated infrastructure that will service a total of 19 new detached
residential dwellings within the Woodview Homes draft approved residential plan of subdivision
located on the former residential lots at 1952, 1956 and 1960 Woodview Avenue in the City of
Pickering.
CFN: 58598 - Application #: 1134/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 11, 2017
528
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
82 SOUTH KINGSWAY - Humber River Watershed
The purpose is to construct a two storey single family dwelling with integral garage and rear
deck at 82 South Kingsway in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58320 - Application #: 0905/171TOR
Report Prepared by: Anna Lim, extension 5284, email alien@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 18, 2017
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing pedestrian bridge at Rowntree Mills Park, located
northwest of Islington Avenue and Finch Avenue West. Works will involve removal and
replacement of the existing bridge and abutments. The warm water construction timing window
of July 1 to March 31 will apply to this proposal.
CFN: 57795 - Application #: 0627/171TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: October 13, 2017
63 KENNEDY PARK ROAD - Humber River Watershed
The purpose is to construct an at grade patio and replace the existing one storey addition to the
rear of the existing single family dwelling at 63 Kennedy Park Road in the City of Toronto
(Etobicoke York Community Council Area).
CFN: 58407 - Application #: 1002/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 5, 2017
57 STORER DRIVE - Humber River Watershed
The purpose is to construct a second storey addition above the existing single family dwelling at
57 Storer Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58063 - Application #: 0679/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 17, 2017
51 VAN DUSEN BOULEVARD - Waterfront Watershed
The purpose is to construct an inground pool and deck to the rear of an existing single family
detached dwelling municipally described as 51 Van Dusen Boulevard in the City of Toronto
(Etobicoke York Community Council Area).
529
CFN: 58180 - Application #: 0780/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 19, 2017
75 VALECREST DRIVE - Humber River Watershed
The purpose is to construct a two storey single family dwelling with integral garage and rear
deck at 75 Valecrest Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58340 - Application #: 0919/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 5, 2017
TORONTO COMMUNITY HOUSING - Humber River Watershed
The purpose is to construct an accessible ramp, new sidewalk and driveway to the existing 10
storey residential apartment building at 3725 Dundas Street West in the City of Toronto
(Etobicoke York Community Council Area).
CFN: 58659 - Application #: 1168/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 13, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
77 CHATSWORTH DRIVE - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage, rear terrace
and minor landscaping at 77 Chatsworth Drive in the City of Toronto (North York Community
Council Area).
CFN: 56254 - Application #: 0730/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 16, 2017
23 TUDOR GATE - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage, rear patio
and associated hardscaping at 23 Tudor Gate in the City of Toronto (North York Community
Council Area).
CFN: 57815 - Application #: 0517/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 4, 2017
530
125 THREE VALLEY DRIVE - Don River Watershed
The purpose is to construct a new single storey solarium to the rear of the existing dwelling
located at 125 Three Valleys Drive in the City of Toronto (North York Community Council Area).
CFN: 56752 - Application #: 1126/16/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 13, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
113 SYLVAN AVENUE - Waterfront Watershed
The purpose is to construct a two-storey replacement dwelling with integral garage, rear wood
deck and basement walk -out at 113 Sylvan Avenue in the City of Toronto (Scarborough
Community Council Area).
CFN: 56252 - Application #: 0728/161TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 11, 2017
14 JANELLAN TERRACE - Highland Creek Watershed
The purpose is to construct a two-storey addition and second storey addition with rear deck to
the existing dwelling located at 14 Janellan Terrace in the City of Toronto (Scarborough
Community Council Area).
CFN: 57732 - Application #: 0434/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 11, 2017
1 ROSSFORD ROAD - Don River Watershed
The purpose is to construct a rear two-storey addition, second storey addition and rear deck to
the existing dwelling with associated landscaping located at 1 Rossford Road in the City of
Toronto (Scarborough Community Council Area).
CFN: 58105 - Application #: 0743/171TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 18, 2017
SCARBORO GOLF & COUNTRY CLUB - Highland Creek Watershed
The purpose is to regrade and realign the 18th tee deck and relocate an existing armour stone
retaining wall located at 321 Scarborough Golf Club Road in the City of Toronto (Scarborough
Community Council Area).
531
CFN: 58521 - Application #: 1084/171T OR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 6, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
2 NEVILLE PARK BOULEVARD - Waterfront Watershed
The purpose is to construct an extension to the existing integral garage and a second storey
deck to the existing two storey detached dwelling at 2 Neville Park Boulevard in the City of
Toronto (Toronto and East York Community Council Area).
CFN: 56893 - Application #: 1202/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 20, 2017
CITY OF VAUGHAN
1834371 ONTARIO INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate site alteration involving excavation and construction of shoring
walls and foundations associated with two (2) multi -unit high rise buildings and associated
underground parking. The subject properties are located on lands known municipally as 2951
Highway 7 and 190 and 180 Maplecrete Road, in the City of Vaughan.
CFN: 58010 - Application #: 0686/17NAUG
Report Prepared by: Stephen Bohan, extension
For information contact: June Little, extension
Date: October 10, 2017
29 THORNBANK ROAD - Don River Watershed
5743, email sbohan@trca.on.ca
5756, email jlittle@trca.on.ca
The purpose is to facilitate, within TRCA's Regulated Area of the Don River watershed, the
continued development of a 731.70 sq. m. (7875 sq. ft.) two storey residential dwelling on lands
known municipally as 29 Thornbank Road in the City of Vaughan. Development was previously
approved under elapsed TRCA permit C-140952 with the current application proposing to
complete remaining works.
CFN: 58680 - Application #: 1203/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 13, 2017
532
TOWN OF AJAX
CLAREMONT STOREHOUSE INC. - Carruthers Creek Watershed
The purpose is to undertake excavation and install site servicing infrastructure on the vacant
industrial lot at 285 Achilles Road in the Town of Ajax.
CFN: 58678 - Application #: 1194/17/AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 11, 2017
TOWN OF CALEDON
1664380 ONTARIO INCORPORATED - Humber River Watershed
The purpose is to backfill the excavation site to pre-existing site conditions and stabilize the
soils just south of Highway 9 and west of Glen Haffy Road as a result of the fuel spill that
occurred along Highway 9 on March 7, 2017. This permit is in accordance with the TRCA
Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). No
in -water works are associated with this project.
CFN: 57863 - Application #: 0620/171CAL
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: October 4, 2017
2033665 ONTARIO LIMITED - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a proposed 10,930 sq. m (111,650 sq. ft.), 4 -
storey self storage building associated with a municipal building permit, municipal Site Plan
application (Town File No.: SPA 16-0027) and municipal Zoning By-law Amendment application
(Town File No.: RZ 16-05).
CFN: 57638 - Application #: 0374/171CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: October 13, 2017
65 STRAWBERRY HILL COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 3.6 m (12 ft) by 9.1 m (30 ft) in -ground pool
and patio area associated with a municipal building permit.
CFN: 58026 - Application #: 0852/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: October 23, 2017
533
TOWN OF CALEDON - Humber River Watershed
The purpose is to stabilize an embankment and reconstruct 150 m of Humber Station Road
located approximately 850 m south of Castlederg Sideroad in the Town of Caledon. This permit
is issued in accordance with TRCA's Permission for Emergency Infrastructure Works Review
Protocol (Authority Res. #A105/15). The construction timing window of October 15 to November
30 will apply to this project as per the Ministry of Natural Resources and Forestry (MNRF).
CFN: 58542 - Application #: 1094/17/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: October 4, 2017
TOWN OF RICHMOND HILL
COGECO PEER 1 - Rouge River Watershed
The purpose is to install Cogeco conduit within the existing road right-of-way (ROW) of Leslie
Street between Performance Drive and Farnham Road and along the Via Renzo Drive between
Ultimate Drive and Performance Drive. The cold water construction timing window of July 1 to
September 15 will apply to this proposal.
CFN: 56846 - Application #: 0170/171RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 16, 2017
LONG BODY HOMES INC. - Rouge River Watershed
The purpose is to place and remove fill within a Regulated area to facilitate initial earthworks
associated with a new residential plan of subdivision.
CFN: 55953 - Application #: 0497/16/RH
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: October 16, 2017
REGIONAL MUNICIPALITY OF YORK - Humber River Watershed
The purpose is to widen Bayview Avenue from a two lane road to a four lane road within the
existing road platform, in the Town of Richmond Hill. The proposed works also include on -street
bike route and a sidewalk or multi -use path as part of the Lake to Lake trail system. The Ministry
of Natural Resources and Forestry (MNRF) Redside Dace timing window does apply to this
proposal, unless otherwise specified in writing by MNRF.
CFN: 56822 - Application #: 0004/17/RH
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: October 23, 2017
534
12 SUNBAY COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 334.75 sq.m (3,602.9 sq.ft) replacement
dwelling associated with a municipal Site Plan application (Town File: D06-17002) and building
permit.
CFN: 58707 - Application M 1190/171RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: October 18, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
55 ABBOTSFORD ROAD - Rouge River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Rouge River Watershed, the
continued development of an 880.57 sq. m. (9472 sq. ft.) residence on an estate lot adjacent to
the White Rose -Preston Lake Provincially Significant Wetland, on lands known municipally as
55 Abbotsford Road, in the Township of Whitcurch-Stouffville.
CFN: 58683 - Application M 1209/17/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: October 16, 2017
TOWNSHIP OF KING
6265 15TH SIDEROAD - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a new 230.9 sq. m. (2485 sq. ft.) dwelling, a new 91.5 sq. m. (984.89 sq. ft.)
attached garage, and a new driveway with watercourse crossing on lands known municipally as
6265 15th Sideroad, in the Township of King.
CFN: 58705 - Application M 1197/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 17, 2017
TOWNSHIP OF UXBRIDGE
711371 ONTARIO CORP - Duffins Creek Watershed
The purpose is to construct an eight (8) lot estate residential subdivision, municipal roadway
and storm water management infrastructure.
CFN: 55579 - Application M 0240/16/UXB
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 13, 2017
535
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
2193914 CANADA LIMITED
To undertake sewer, watermain or utility installation or maintenance on the west side of Heart
Lake Road south of Sandalwood Parkway, in the City of Brampton, Etobicoke Creek Watershed
as located on the property owned by TransCanada Pipelines, who has assigned rights to
2193914 Canada Limited. The purpose is to perform an integrity dig and repair works on an
existing gas pipeline. No in -water works are associated with this project.
CFN: 58166 - Application #: 0979/17/13RAM
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 6, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain, utility installation or maintenance within an existing roadway
along Queen Street East, west of Airport Road, in the City of Brampton, Mimico Creek
Watershed as located on property owned by the City of Brampton. The purpose is to install
100 mm diameter conduit for Rogers Communication Canada Inc. along Queen Street East,
approximately 50 m west of Airport Road, in the City of Brampton. No in -water works are
associated with this project.
CFN: 58092 - Application #: 0916/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: October 5, 2017
CITY OF MARKHAM
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on the west side of Woodbine Avenue, near 19th Avenue, in the City of Markham,
Rouge River Watershed as located on property owned by TransCanada Pipelines, who has
assigned rights to Enbridge Gas Distribution Inc. The purpose is to perform an integrity dig and
repair works on an existing gas pipeline. No in -water work is associated with this project.
536
CFN: 58167 - Application #: 0975/17/MARK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 5, 2017
REGIONAL MUNICIPALITY OF YORK
To undertake sewer, watermain or utility watercourse crossing by trenchless technology near
184 Bullock Drive, in the City of Markham, Rouge River Watershed as located on the property
owned by City of Markham. The purpose is to replace the existing 600mm Ductile Iron (D.I.)
substandard watermain with a new 600mm watermain crossing under the closed bottom culvert
through a steel casing near 184 Bullock Drive, in the City of Markham. The existing watermain is
proposed to be capped, filled with grout and abandoned. The warm water timing window will
apply to this project.
CFN: 58423 - Application #: 0983/17/MARK
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: October 16, 2017
CITY OF PICKERING
ENBRIDGE PIPELINES INC.
To undertake structure maintenance at an Enbridge Pipelines Inc. site, located south of Taunton
Road and east of Brock Road, in the City of Pickering, Duffins Creek Watershed as located on
property owned by Her Majesty The Queen In Right Of Ontario As Represented By The Minister
Of Public Infrastructure with whom Enbridge Pipelines has an easement agreement. The
purpose is to undertake two integrity digs to conduct repairs on an existing pipeline at two
Enbridge Pipelines Inc. sites (MP1931.6799 and MP1931.7651), located south of Taunton Road
and east of Brock Road, in the City of Pickering. The Redside Dace construction timing window
applies to this project unless otherwise specified in writing by the Ministry of Natural Resources
and Forestry (MNRF).
CFN: 58466 - Application #: 1019/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: October 5, 2017
ENBRIDGE PIPELINES INC.
To undertake structure maintenance at an Enbridge Pipelines Inc. site, located north of Taunton
Road and west of Church Street North, in the City of Pickering, Duffins Creek Watershed as
located on property owned by Ontario Land Corporation with whom Enbridge Pipelines has an
easement agreement. The purpose is to undertake an integrity dig to conduct repairs on an
existing pipeline at an Enbridge Pipelines Inc. site (MP1932.3136), located north of Taunton
Road and west of Church Street North, in the City of Pickering. No in -water works are
associated with this project.
537
CFN: 58470 - Application #: 1087/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: October 5, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Taysham Crescent, Kipling Avenue, Farr Avenue, 1 Farr Avenue and 143 Taysham
Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed, as located on City of Toronto and private property with permission obtained. The
purpose is to place conduit. No in -water works are within the scope of this project.
CFN: 56866 - Application #: 1218/16/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 11, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on The Queensway from Etobicoke
Creek to Sherway Gardens Road, near The West Mall, in the City of Toronto (Etobicoke York
Community Council Area), Etobicoke Creek Watershed as located on property owned by the
City of Toronto. The purpose is to undertake road resurfacing and sidewalk construction on The
Queensway from Etobicoke Creek to Sherway Gardens Road. The warm water construction
timing window of July 1st to March 31st will apply to this proposal.
CFN: 57657 - Application #: 0448/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 16, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction in High Park located at 1873 Bloor
Street West near Keele Street, in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed as located on property owned by the City of Toronto. The purpose is
to undertake repaving of existing pathways in High Park. No in -water work is within the scope of
this project.
CFN: 58265 - Application #: 1058/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 11, 2017
538
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Albion Road from Golfdown Drive to Omagh Avenue and Omagh Avenue - near
Weston Road, in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed as located on the property owned by City of Toronto. The purpose is to install
conduit. No in -water work is within the scope of this project.
CFN: 57679 - Application #: 0750/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 11, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Dixon Road, west of Islington Avenue, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed as located on the property owned by City
of Toronto. The purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 58256 - Application #: 1020/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 16, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Old Burnhamthorpe Road from Elmcrest Road to Melbert Road in the City of Toronto
(Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install conduit and a vault. No in -water work is
within the scope of this project.
CFN: 58263 - Application #: 1022/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 6, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake drainage structure general maintenance on Dufferin Street, located south of Finch
Avenue West, in the City of Toronto (North York Community Council Area), Don River
Watershed as located on property owned by the City of Toronto. The purpose is to repair
cracks in a concrete culvert. The warm water construction timing window of July 1 to March 31
will apply to this project.
CFN: 58261 - Application #: 0992/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 17, 2017
539
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Lumsden Avenue and Eastdale Avenue, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 58255 - Application #: 0861/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 6, 2017
CITY OF VAUGHAN
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Centre Street, in the City of Vaughan, Don River Watershed as located on the
property owned by Regional Municipality of York. The purpose is to undertake installation of
Bell conduits within TRCA regulated area along Centre Street, east of Dufferin Street, west of
Concord Road, in the City of Vaughan. The installation is required as part of the road widening
of Centre Street in order to accommodate the VIVA Bus Rapid Transit (BRT) Project. Installation
of the conduits will be carried via open trench and horizontal directional boring.
CFN: 58143 - Application #: 0890/17/VAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: October 23, 2017
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway south of Highway 7, east of Highway 400, in the City of Vaughan, Don River
Watershed as located on the property owned by the Regional Municipality of York. The purpose
is to undertake installation of Bell conduits along the south side of Highway 7, east of Highway
400 in the City of Vaughan. The installation is required as part of the road widening of Highway
7 in order to accommodate the VIVA Rapid Bus Transit Project. Installation of the conduits will
be carried out via open trench and horizontal directional boring.
CFN: 58144 - Application #: 0891/17NAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: October 20, 2017
540
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing right-of-
way located at the end of Forest Heights Boulevard, south of Old Humber Crescent, in the City
of Vaughan, Humber River Watershed as located on property owned by TransCanada
Pipelines, who has assigned rights to Enbridge Gas Distribution Inc. The purpose is to perform
an integrity dig in order to inspect an existing natural gas pipeline. No in -water work is
associated with this project.
CFN: 57952 - Application M 0804/17/VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 6, 2017
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within a new subdivision al
1870 Altona Road, located south of Pine Grove Avenue and west of Altona Road, in the Town
of Ajax, Petticoat Creek Watershed as located on property owned by a private landowner, from
whom Enbridge Gas Distribution Inc. is obtaining easements. The purpose is to install NPS 1
1/4 PE IP and NPS 2 PE IP gas header services in order to service a new subdivision, which
was approved under a separate TRCA permit (C-170037). No in -water work is associated with
this project.
CFN: 58455 - Application #: 1159/17/AJAX
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 5, 2017
TOWN OF AJAX
To undertake structure maintenance on pedestrian bridge 109 located just east of Westney
Road near Noake Crescent and pedestrian bridge 107 located east of Westney Road near
Cornwall Drive, in the Town of Ajax, Duffins Creek Watershed as located on the property owned
by Town of Ajax. The purpose is to rehabilitate two pedestrian bridges in the Town of Ajax. The
first bridge (109) is located just east of Westney Road near Noake Crescent and the second
bridge (107) is located east of Westney Road near Cornwall Drive. The warm water construction
timing window will be applied to this project.
CFN: 58439 - Application M 1059/17/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: October 24, 2017
541
TRANS -NORTHERN PIPELINES INC. (TNPI)
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -312.86-2017), located south of 5th Concession Road and west of Salem Road
North, in the Town of Ajax, Duffins Creek Watershed as located on property owned by a private
landowner with access granted through a permission to enter. The purpose is to undertake an
integrity dig to conduct repairs on an existing pipeline at a Trans -Northern Pipeline Inc. (TNPI)
site (MP -312.86-2017), located south of 5th Concession Road and west of Salem Road, in the
Town of Ajax. No in -water work is associated with this project.
CFN: 58469 - Application #: 1076/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: October 6, 2017
TOWN OF RICHMOND HILL
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Major Mackenzie Drive East crossing Beaver Creek near Spadina Road, in the Town of
Richmond Hill, Rouge River Watershed as located on the property owned by the Regional
Municipality of York. The purpose is to install two 4 inch underground conduits on the south
side of Major Mackenzie Drive East near Spadina Road in the Town of Richmond Hill. The
warm water construction timing window will apply to this project..
CFN: 58160 - Application #: 0971/171RH
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: October 6, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
TOWN OF WHITCHURCH-STOUFFVILLE
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on 8 Park Drive, from Main Street and Mill Street, in the Town of Whitchurch-
Stouffville, Duffins Creek Watershed as located on the property owned by Town of Whitchurch-
Stouffville. The purpose is to install a conduit adjacent to 8 Park Drive in the Town of
Whitch uch-Stouffville, Duffins Creek watershed on property owned by the Town of Whitchurch-
Stouffville.
CFN: 58158 - Application #: 0993/17NVS
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: October 16, 2017
542
TOWN OF WHITCHURCH-STOUFFVILLE
To undertake sewer and watermain or utility crossing by trenchless technology on 6240 Main
Street, near Park Drive and Mill Street, in the Town of Whitchurch-Stouffville, Duff ins Creek
Watershed as located on the property owned by Town of Whitchurch-Stouffville. The purpose is
to install an underground conduit at 6240 Main Street in the Town of Whitchurch-Stouffville..
CFN: 58159 - Application #: 0994/171WS
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: October 24, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
25 FORESTGROVE CIRCLE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 24, Plan, 25
Forestgrove Circle, in the City of Brampton, Etobicoke Creek Watershed.
CFN: 58602 - Application #: 1145/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: October 4, 2017
CITY OF MARKHAM
11 ROCKINGHAM COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (11
Rockingham Court), in the City of Markham, Don River Watershed.
CFN: 58691 - Application #: 1228/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: October 19, 2017
CITY OF PICKERING
2306 SOUTHCOTT ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 10, Plan
40M-2344, (2306 Southcott Road), in the City of Pickering, Duffins Creek Watershed.
543
CFN: 58574 - Application #: 1115/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 10, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
33 EDGEHILL ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 12,
Concession C, (33 Edgehill Road), in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on the property owned by Gareth and Celeste
Brennan.
CFN: 58739 - Application #: 1236/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 20, 2017
53 THICKET ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 66, Plan M-1097, (53 Thicket Road), in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 58706 - Application #: 1191/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 17, 2017
48 RIDGEVALLEY CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 22, Plan 258,
(48 Ridgevalley Crescent), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 58543 - Application #: 1093/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 10, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
17 BERKSHIRE AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 78, 79, Plan M-445, (17 Berkshire
Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed.
544
CFN: 58401 - Application M 0965/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 16, 2017
CITY OF VAUGHAN
51 GLEN SHIELD AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (51 Glen Shield
Avenue), in the City of Vaughan, Don River Watershed.
CFN: 58716 - Application M 1202/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 17, 2017
166 HEINTZMAN CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 55, Plan
65M-4266, (166 Heintzman Crescent), in the City of Vaughan, Don River Watershed.
CFN: 58686 - Application M 1211/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 20, 2017
166 FARRELL ROAD
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 90, Plan 65M-4425, (166
Farrell Road), in the City of Vaughan, Don River Watershed.
CFN: 57980 - Application M 1166/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 5, 2017
TOWN OF AJAX
29 ANGIER CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Block 9,
Plan 40M2136, (29 Angier Crescent), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 58585 - Application M 1096/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 10, 2017
545
4 DUCKFIELD CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 2, Plan 40M02239, (4 Duckfield Crescent), in the
Town of Ajax, Carruthers Creek Watershed.
CFN: 58577 - Application M 1119/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 19, 2017
35 ANGIER CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 1067, PART 43, Block 10, Plan 40M-2136, (35
Angier Crescent), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 58594 - Application #: 1136/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 6, 2017
59 ANGIER CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 31, Plan 40M2136, (59 Angier Crescent), in the Town
of Ajax, Carruthers Creek Watershed.
CFN: 57981 - Application #: 1183/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 12, 2017
TOWN OF CALEDON
135 CONNAUGHT CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 37, Plan 887,
135 Connaught Crescent, in the Town of Caledon, Humber River Watershed.
CFN: 58596 - Application #: 1132/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: October 11, 2017
546
TOWNSHIP OF KING
24 RICHARD SERRA COURT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non -
habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition or
structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 9, Plan
65M-4271, (24 Richard Serra Court), in the Township of King, Humber River Watershed.
CFN: 58674 - Application #: 1180/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 10, 2017
1196 - 15TH SIDEROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5, Plan 522,
(1196 - 15th Sideroad), in the Township of King, Humber River Watershed.
CFN: 58668 - Application #: 1189/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 13, 2017
10 SIM HILL CRESCENT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 32, Plan
65M-4277, (10 Sim Hill Crescent), in the Township of King, Humber River Watershed.
CFN: 58658 - Application #: 1163/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 5, 2017
PERMIT APPLICATIONS 10.3 —10.6 ARE MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
547
CITY OF MARKHAM
10.3 2585231 ONTARIO INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Lot 20, Concession 8,
(9999 Highway 48 (Markham Road)), in the City of Markham, Rouge River Watershed
as located on the property owned by 2585231 Ontario Inc.. The purpose is to alter a
waterway and conduct grading works within a Regulated Area of the Rouge river
Watershed in order to realign and naturalize a stretch of Exhibition Creek at 9999
Highway 48, in the City of Markham.
CFN: 58731 - Application #: 1273/17/MARK
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: October 31, 2017
TOWN OF CALEDON
10.4 BOLTCOL HOLDINGS NORTH INC. AND BOLTCOL HOLDINGS SOUTH INC.
To construct, reconstruct, erect or place a building or structure, site grade and alter a
watercourse on Part Lot 2, 3, Concession 5 ALBION Part 1, Part 2 Plan 43R33412, (0
Coleraine Drive and 12300 Coleraine Drive), in the Town of Caledon, Humber River
Watershed as located on the property owned by Boltcol Holdings North Inc. and Boltcol
Holdings South Inc.. The purpose is to grade, remove and place fill, and construct within
a Regulated Area to facilitate the construction of a stormwater management pond
associated with a large format employment land site plan application.
CFN: 56927 - Application #: 0032/17/CAL
Report Prepared by: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
Date: November 1, 2017
TOWN OF CALEDON
10.5 BOLTCOL HOLDINGS NORTH INC. AND BOLTCOL HOLDINGS SOUTH INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Part Lot 2, 3, Concession
5 ALBION Part 1, Part 2 Plan 43R33412, (0 Coleraine Drive and 12300 Coleraine
Drive), in the Town of Caledon, Humber River Watershed as located on the property
owned by Boltcol Holdings North Inc. and Boltcol Holdings South Inc.. The purpose is to
grade, remove and place fill, and construct within a Regulated Area to facilitate site
grading, watercourse realignment works and installation of a storm sewer pipe
associated with a large format employment land site plan application.
CFN: 56928 - Application #: 0033/17/CAL
Report Prepared by: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
Date: November 1, 2017
TOWN OF RICHMOND HILL
10.6 MATTAMY HOMES (ELGIN MILLS) LIMITED
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28,
Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by Mattamy Homes (Elgin
Mills) Limited. The purpose is to undertake works within a TRCA Regulated Area of the
Rouge River Watershed in order to facilitate Phase 2 topsoil stripping, stockpiling, site
alteration and grading, import large volumes of fill and implement sediment and erosion
control measures in support of an approved draft plan of subdivision, associated with a
municipal building permit.
CFN: 58743 - Application #: 1267/17/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: November 1, 2017
TERMINATION
ON MOTION, the meeting terminated at 9:36 a.m., on Friday, November 03, 2017.
Maria Augimeri
Chair
/ks
549
Brian Denney
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #10/17 was held at TRCA Head Office, on Friday, December
15, 2017. The Senior Manager, Corporate Secretariat Kathy Stranks, called the meeting to
order at 9:40 a.m.
PRESENT
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Chris Fonseca
Member
Jennifer Innis
Member
Colleen Jordan
Member
Mike Mattos
Member
Jennifer McKelvie
Member
ABSENT
Maria Augimeri
Chair
Jack Heath
Vice Chair
Brenda Hogg
Member
Anthony Perruzza
Member
RES.#B104/17 - ELECTIONS
Moved by: Glenn De Baeremaeker
Seconded by: Colleen Jordan
THAT Jennifer Innis be elected to Chair Executive Committee Meeting #10/17, held on
December 15, 2017.
CARRIED
RES.#B105/17
Moved by:
Seconded by:
MINUTES
Jack Ballinger
Colleen Jordan
THAT the Minutes of Meeting #9/17, held on November 17, 2017, be approved.
CARRIED
DELEGATIONS
4.1 A delegation by Mr. James Thompson, CEO, Water Arts Inc. and J. Garfield Thompson
Landscape Ltd., in regard to item 7.2 - Request for Disposal of Toronto and Region
Conservation Authority Land, 4156 Dundas Street West, Etobicoke.
550
RES.#6106/17 - DELEGATIONS
Moved by: Vincent Crisanti
Seconded by: Glenn De Baeremaeker
THAT above -noted delegation 4.1 be received.
CARRIED
551
Section I — Items for Authority Action
RES.#6107/17 - REQUEST FOR DISPOSAL OF TORONTO AND REGION
CONSERVATION AUTHORITY LAND
14 Pickering/Scarborough Townline, City of Toronto, Rouge River
Watershed, CFN 33517. Receipt of a request from Melissa Preston and
Laura Alderson, Co -Executors of Joyce Scott's Estate, (former tenant of
Toronto and Region Conservation Authority) to consider the sale of a
portion of Toronto and Region Conservation Authority owned land located
at 14 Pickering/Scarborough Townline, City of Toronto, Rouge River
watershed.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation
Authority (TRCA) owned property at 14 Pickering/Scarborough Townline, in the City of
Toronto, be retained in TRCA ownership until such time as it is conveyed to Parks Canada
for the Rouge Urban National Park.
CARRIED
BACKGROUND
In July 2017, TRCA was approached by Melissa Preston and Laura Alderson, Co -Executors of
Joyce Scott's Estate, (former tenant of TRCA) to consider the sale of a portion of TRCA land
located at 14 Pickering/Scarborough Townline, City of Toronto, Rouge River watershed.
At Executive Committee Meeting #6/17, held on August 11, 2017, Resolution #B68/17 was
approved as follows:
THAT the potential disposal of a portion of Toronto and Region Conservation Authority
(TRCA) owned property located at 14 Pickering/Scarborough Townline, City of Toronto,
be referred to TRCA staff for review and discussion in accordance with established TRCA
policies.
AND FURTHER THAT a report be brought forward to the Executive Committee at a future
date recommending further action.
This request was circulated to staff at Parks Canada, Ministry of Infrastructure, Infrastructure
Ontario, City of Toronto, TRCA Planning and Development staff, and TRCA legal counsel for
review and comment in accordance with TRCA's Disposal Policy. The following comments have
been received:
Parks Canada
Parks Canada welcomed the opportunity to provide input on the request to purchase the 14
Pickering Townline property. While Parks Canada mentioned they were sympathetic to the
personal circumstances of the Scott family, those circumstances and past land use decisions and
transactions predate Parks Canada's involvement in these lands by decades.
Parks Canada indicated in their correspondence that if, as planned, the property becomes part of
the country's first ever national urban park, this land would assuredly be protected from
development for generations to come as part of Rouge National Urban Park, and it would
contribute to the critical goal of connecting park land from the Oak Ridges Moraine to Lake
Ontario.
552
The property also has significant ecological features that Parks Canada would work to protect and
enhance. For instance, a stretch of Petticoat Creek — near the headwaters — runs through the
property and would benefit from Rouge National Urban Park's aquatic habitat restoration
program. In addition to the waterway, the property sits adjacent to one of the rare remnants of
interior forest in Rouge National Urban Park.
Parks Canada also indicated that heritage properties of this kind also contribute to the story of the
Rouge Valley — a story Parks Canada intends to bring to light through it interpretive programs and
materials. The unprecedented opportunity to add these public lands to Rouge National Urban
Park — a project long supported by all levels of government — would afford the property with its
strongest ever natural and cultural protections and serve as a fitting homage to all prior stewards
of these compelling lands.
Infrastructure Ontario and Ministry of Infrastructure
Infrastructure Ontario in their comments indicated the subject property is part of PIN 06053-0394
(LT) which was expropriated by the Minister of Housing, Province of Ontario on February 41,
1974. The compensation provided for the subject property at the time was in the amount of
$365,610 (inclusive of the settlement price for the property, compensation for all inconvenience
and entitlements and interest).
The property was later transferred to the Ontario Land Corporation and on March 31, 1987 was
transferred to Her Majesty the Queen in Right of Ontario as represented by the Minister of
Government Service. On May 261, 2003, the Minister of Municipal Affairs and Housing,
successor to the Minister of Housing, approved the sale and disposal of certain lands, including
this property, situated within the Rouge Park Lands without giving the owner from whom the land
was expropriated the first chance to repurchase the land. This is referred to as a Section 42
Waiver.
The lands were transferred to the TRCA for a nominal sum on March 31, 2004 for the purpose of
the establishment of the Rouge Park. In the transfer to TRCA, the Province retained interests in
the Lands being: a first right of refusal (right to repurchase) for the Province to reacquire the
Lands if the TRCA moved to dispose of the Lands; and, a conservation easement in the
Province's favour.
The Minister of Infrastructure transferred Ontario's interests in the Lands to Parks Canada for the
Rouge National Urban Park effective October 21, 2017. It is understood that the TRCA has
entered into agreements with the federal government to contribute the Lands to the federal
government at nominal value to the Rouge National Urban Park. When the federal government
receives the Lands from the TRCA, the interests that the Province has transferred to the federal
government will merge with the ownership.
10 is not aware of any properties expropriated in the Rouge National Urban Park area that have
been sold back to the original owners.
City of Toronto Staff
This property is designated as Natural Areas in the Official Plan and Open Space in the Zoning
By-law.
The property is located within the area subject to the Toronto Official Plan Site and Area Specific
Policy 141: Rouge Valley Area. Policy c) states:
553
To ensure the continued maintenance of the area by public agencies, the division of lands by
consent and/or the sale or disposal of will be prohibited, unless;
a. The land is being conveyed to TRCA or Parks Canada for parks or conservation
purposes; or
b. The land is being conveyed to the City, for infrastructure approved by Council, or to
the owner of existing or approved infrastructure.
The property is partially located within the Official Plan natural heritage system. If consent is
required, Policy 3.4.11 c) would apply:
11. Consents to sever land or approval of plans of subdivision will not be permitted for
any parcel of land that is entirely within or part of the natural heritage system,
unless:
a. The land is being conveyed to the Toronto and Region Conservation
Authority or other public agencies;
b. The land is within an approved Special Policy Area; or
c. The assessment of the impacts to the natural heritage system has been
satisfactorily completed.
Section 4.3.8 of the Toronto Official Plan States, "The sale or disposal of publicly owned lands in
Parks and Open Space Areas is discouraged and no City owned lands in Parks and Open Space
Areas will be sold or disposed of."
In addition, Rouge Park is designated as Open Space as well as Natural Areas. Section 4.3.3 of
the OP states "the areas shown as Natural Areas on Maps 13-23 will be maintained primarily in a
natural state, while allowing for.-
a)
or:a) Compatible recreational, cultural and education uses and facilities that minimize
adverse impacts on natural feature and functions; and
b) Conservation projects, public transit, public works and utilities for which no reasonable
alternatives are available, and that are designed to have only minimal adverse impacts
on natural features and functions."
A 3.44m widening is required by the City along the frontage of this property to satisfy the
requirement of a 27m wide right-of-way for this section of Pickering/Scarborough Townline.
City staff would strongly discourage the sale of this property as it is a part of Toronto's Green
Space System.
TRCA staff
The requested parcel for disposal encompasses a main tributary of the Petticoat Creek
valleylands, including a floodplain and an erosion hazard associated with watercourse. The
valleylands form part of the natural system and are contiguous with the Provincially Significant
Townline Swamp Wetland Complex to the south. A portion of the requested parcel, located south
of the existing dwelling and between the valleylands and the road are identified as a cultural
meadow.
554
TRCA is responsible for providing comments of behalf of the Province of Ontario with respect to
Natural Hazard and Natural Feature policies contained in the Provincial Policy Statement, 2014
(PPS, 2014). The property is located within an erosion hazard which is considered a natural
hazard as defined in the PPS. The proposal seeks to sever the existing parcel in order to create a
new lot, with the boundary extending across the Petticoat Creek valleylands. The PPS includes
"the creation of a new lot" within its definition of "development." Section 3.1.2(c) of the PPS
provides that development shall not be permitted in lands subject to flooding or an erosion
hazard.
The property is also partially within the Natural Heritage System as shown in Map 9 of the City of
Toronto's Official Plan (OP), 2002. Section 2.1.5 and 2.1.8 of the PPS provides that development
shall not be permitted within or adjacent to a significant valleylands or significant woodlands
unless it has been demonstrated that there will be no negative impacts on the natural features or
their ecological function.
TRCA is the City of Toronto's partner in managing the natural environment. Section 3.4 of the
City's OP provides policies for development within or near natural hazards and lands containing
the natural heritage system. The west portion of the requested parcel contains a valley feature.
Policy 8 of the City's OP states that development will be set back at least 10 metres from the
top of bank and other locations where slope instability, flooding or physical conditions are
present.
The property is within the natural heritage system as shown in Map 9 the OP. The natural
heritage system is made up of areas where protecting, restoring and enhancing the natural
features and functions should have high priority in our city -building decisions. Policy 11 of the
O P states that consents to sever land will not be permitted for any parcel of land that is within or
part of the natural heritage system unless the lands are to be conveyed to public ownership and a
study has been provided to assess a development's impact on the system.
The Living City Policies for Planning and Development in the Watersheds of the Toronto and
Region Conservation Authority (LCP) guides TRCA's role as an approval authority under Ontario
Regulation 166/06, as amended, and as an advisor to municipalities under the Planning Act with
respect to natural heritage and natural hazards. For the latter role, TRCA has a provincially
delegated responsibility to uphold the provincial interest in protecting life and property from
natural hazards such as flooding and erosion. Because the subject property contains part of the
Petticoat Creek valley corridor, the LCP applies to this application.
The LCP describes a "Natural System" as being made up of natural features and areas. Water
resources, natural hazards, potential natural cover and/or buffers. The LCP recommends that
development not be permitted within the Natural System and that it be conveyed into public
ownership for its long term protection and enhancement.
This request for disposal seeks to sever TRCA-owned lands that encompass a flooding hazard,
erosion hazard and part of the natural heritage system. The creation of a new lot within the
natural heritage system and where natural hazards are present is not permitted under the PPS,
City of Toronto OP, or TRCA's LCP. In addition, the various policy documents encourage the
long-term protection and enhancement of the natural heritage system and protect hazard lands
through public ownership.
TRCA Legal Counsel
Section 42 of the Expropriations Act states:
"Where lands that have been expropriated and are in the possession of the expropriating
authority are found by the expropriating authority to be no longer required for its purposes,
the expropriating authority shall not, without the approval of the approving authority,
dispose of the lands without giving the owners from whom the land was taken the first
chance to repurchase the lands on the terms of the best offer received by the
expropriating authority."
In the case of 14 Pickering/Scarborough Townline, the Minister of Housing for the Province of
Ontario was the expropriating authority. The first few lines of section 42 provides for an obligation
to convey if the original expropriated authority is still in possession of the lands subject to certain
terms and conditions. Since TRCA was not the original expropriated authority, Section 42 giving
the first right to repurchase to the owner from whom the land was first taken would not apply.
Moreover, when TRCA acquired the land in 2004 the expropriating authority had already obtained
the waiver under Section 42 giving it the right to convey to TRCA. Accordingly, the provision
allowing for conveyance to the former owner which is found in section 42 would also for this
reason not be applicable.
For these reasons, TRCA would have no obligation to honour a request for a repurchase.
RATIONALE
Staff has reviewed and considered all internal and external comments and is recommending that
the land be retained until such time as they are conveyed to Parks Canada for the Rouge Urban
National Park, for the following reasons:
The property was transferred to TRCA by the Province of Ontario on March 31, 2004 for
Rouge Park purposes;
The Province of Ontario retained an Option to Purchase/First Right of Refusal over all the
lands transferred in 2004 including the subject property which option was transferred to
Parks Canada on October 21, 2017 and TRCA must offer the property back to the holder
of the Option to Purchase/First Right of Refusal if considering disposal;
The property is included in the Memorandum of Agreement Respecting the Assembly of
Lands for the Proposed Rouge National Urban Park and will be transferred to Parks
Canada;
The property requested for disposal encompasses a main tributary of the Petticoat
Creek, including floodplain and erosion hazard associated with watercourse;
The valleylands form part of the natural system and are contiguous with the Provincially
Significant Townline Swamp Wetland Complex to the south;
This property is designated as Natural Areas in the City's Official Plan and Open Space in
the City's Zoning By-law;
The creation of a new lot within the natural heritage system and where natural hazards
are present is not permitted under the PPS, City of Toronto OP, or TRCA's LCP.
Report prepared by: Brandon Hester, extension 5767; Mike Fenning, extension 5223
Emails: bhester(a)trca.on.ca, mfenning(cDtrca.on.ca
For Information contact: Brandon Hester, extension 5767; Mike Fenning, extension 5223
Emails: bhester(cDtrca.on.ca, mfenning(a7trca.on.ca
Date: November 15, 2017
Attachments: 1
556
Attachment 1
Y
Subject
Property
l
Legend
® Conservation
/ar The Living City-
L�
'PO's icoat CreeK
L,
RES.#B108/17 - REQUEST FOR DISPOSAL OF TORONTO AND REGION
CONSERVATION AUTHORITY LAND
4156 Dundas Street West, Etobicoke, City of Toronto, Humber River
Watershed, CFN 45819. Recommendation that the subject Toronto and
Region Conservation Authority -owned land located north of Dundas Street
West and east of Prince Edward Drive, municipally known as 4156 Dundas
Street West, Etobicoke, in the City of Toronto, Humber River watershed, be
retained in TRCA ownership.
Moved by: Mike Mattos
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation
Authority -owned (TRCA) land at 4156 Dundas Street West, Etobicoke, in the City of
Toronto, be retained in TRCA ownership at this time;
THAT TRCA staff work with City of Toronto staff to assess the suitability of the subject
TRCA land for use as parkland as part of the Dundas Street West Avenue Study and as
part of any future redevelopment of surrounding area;
AND FURTHER THAT staff report back to a future Executive Committee meeting on the
results of the discussions with City of Toronto staff.
AMENDMENT
RES.#13109/17
Moved by: Glenn De Baeremaeker
Seconded by: Mike Mattos
THAT the second paragraph of the main motion be amended to read as follows:
THAT TRCA staff work with City of Toronto staff and the adjacent landowner to assess the
suitability of the subject TRCA land for use as parkland as part of the Dundas Street West
Avenue Study and as part of any future redevelopment of surrounding area;
THE AMENDMENT WAS
THE MAIN MOTION, AS AMENDED, WAS
BACKGROUND
CARRIED
CARRIED
In November 2010 and March 2011, TRCA was approached by David Rembacz, on behalf of
Maria Rembacz, expressing an interest in purchasing a parcel of TRCA land located north of
Dundas Street West and east of Prince Edward Drive, municipally known as 4156 Dundas Street
West, Etobicoke, in the City of Toronto (the Land). Maria Rembacz is the current owner of the
adjoining property at 4158 Dundas Street West.
The Land was conveyed by the Municipality of Metropolitan Toronto to TRCA in April, 1967. It is a
narrow rectangular parcel with an approximate 12m road frontage to Dundas Street West and is
approximately 55m in length. The land is currently managed by the City of Toronto pursuant to the
Management Agreement dated June 14, 1961.
558
The Land is currently used as a driveway and parking lot for the adjacent commercial business. A
portion of the land has been developed as a "parkette° with benches and in -ground water features
installed by the owner of the adjoining commercial business to the east "Water Arts". TRCA staff is
working with City of Toronto, as manager of the land to resolve the existing encroachments.
The land is burdened by an existing right of way benefiting the western adjoining landowner and
an existing sanitary easement to the City of Toronto.
At Executive Committee Meeting #5/11, held on June 10, 2011, Resolution #696/11 was
approved as follows:
THAT the request for disposal of a parcel of land located on the north side of Dundas
Street West, east of Prince Edward Drive (vacant land between 4154 and 4158 Dundas
Street West), City of Toronto (Etobicoke York Community Council Area) be referred to
Toronto and Region Conservation Authority (TRCA) staff for review and discussion in
accordance with established TRCA policies,-
AND
olicies,
AND FURTHER THAT a report be brought to the Executive Committee at a future date
recommending further action.
Attached is a sketch illustrating the location of the subject land.
This request was circulated to staff at the City of Toronto and TRCA staff for review and comment.
In accordance with TRCA policy, the following comments have been received and action taken to
date:
TRCA staff
Planning and Development staff has confirmed that the land is partially located within TRCA's
Regulated Area of the Humber River watershed. The Humber valley slope in this location is
extremely steep and affected by toe erosion and active slope failure in select areas. There is a
significant hazard along this reach and a 10m buffer must be applied from the long term stable
slope line to any new development along this reach, and the valley corridor including the 10 metre
buffer should be retained in public ownership.
Staff indicated that there will likely be some developable area, but given the significant hazard, a
complete development limits analysis should be done to determine the extent of the valley
corridor and the extent of the land that could be sold. This would best take place through a
comprehensive geotechnical slope stability study of the entire reach along Dundas Street. The
City has completed an Avenue Study for the area; there is considerable development pressure
and it is likely that the portion of the lands outside of the natural hazard can be incorporated into a
development scheme at some point in the future.
Preliminary geotechnical investigations undertaken by internal TRCA staff estimate that the long
term stable slope crest (LTSSC) would be 23m from the existing top of slope, with a further 10m
buffer area.
Attached is a sketch illustrating the top of slope, LTSSC and buffer area.
559
City of Toronto staff
The Land is designated Mixed Use Areas in the Official Plan. The land is also subject to Site and
Area Specific Policy No. 277 (SASP 277) which was adopted in 2006 to implement the Dundas
Street West Avenue Study. The Dundas Street West portion of the site is identified as an Avenue
on Map 2 — Urban Structure of the Official Plan. Avenues are areas where growth and
reurbanization are intended to occur.
The land is subject to the former City of Etobicoke Zoning Code, as amended by By-law No.
717-2006 which is the implementing Zoning By-law for SASP 277. The land is zoned General
Commercial — Avenues — Holding (CG -AV -H).
The CG -AV -H zone permits a limited range of residential uses, including apartment houses,
dwelling units above business or retail uses and live -work units. Townhouses are not permitted on
the north side of Dundas Street West and in the first 60 m of depth on the south side of Dundas
Street West. Permitted uses include stores, banks, restaurants, hotels, business and professional
offices, service stations and public garages, health centres and athletic clubs.
The CG -AV -H zone includes an "H" Holding Symbol that applies to the subject site. The "H"
symbol may be removed by the City of Toronto subject to the satisfactory availability of any road,
infrastructure, servicing and school capacity improvements necessary to accommodate the
proposed development. Upon fulfillment of these criteria, the "H" symbol can be removed, in
whole or in part.
In June 2011, City of Toronto was asked to provide any comments about the request to sell the
land. The City undertook an internal circulation to ascertain whether there was any objection to
the sale of the land. The only comment back by City Planning Staff was:
'We would not have any issues with the proposed sale of this property from a natural
heritage point of view. As with any property of this type, any new development would need
to be set back 10m from the stable top of bank. A geographical study would be required to
establish stable top of bank, a natural impact study may be required. "
In March 2016, the City of Toronto was asked if they had any interest in the potential sale of the
land or were interested in purchasing it. The City responded that they had no interest in
purchasing the land.
Prior to engaging with the public, the City was again asked in July 2016 to confirm whether they
have any interest in the land. The City confirmed that there was no interest in purchasing it.
Following the public consultation process, TRCA staff also spoke directly with the relevant Parks,
Forestry and Recreation planner for the Etobicoke York district. The Parks planner indicated that
the City's priority for this area is to provide direct access to the Humber River. However, given the
steep slope and existing erosion hazard, there is no interest in purchasing the land. TRCA and
City staff will continue to work together to identify ongoing recreational opportunities and
assessment of the land as a parkland as part of future redevelopment of the surrounding area.
Public Consultation
TRCA staff met on-site with the adjoining landowners on February 9, 2017 to discuss the
disposal process, upcoming Public Information Session and existing encroachments on
the property;
560
Notice of the Public Information Session was distributed during the week of January 30,
2017 to nearby residents via a Canada Post "letterdrop" service;
A dedicated webpage on the TRCA website and email address for comments and
questions was created. The webpage provided general information about the property,
process for disposal, relevant contact information and invited the public to attend the
Public Information Session;
Notices of the Public Information Session were distributed to the City of Toronto Parks,
Forestry and Recreation Department and Councillor Justin Di Ciano and Councillor John
Campbell (as the property is located on the ward boundary);
Notices of the Public Information Session were placed in the Etobicoke Guardian and the
Toronto Star on February 2, 2017;
A Public Information Session was held on February 16, 2017, at Lambton House, 4066
Old Dundas Street, from 6:00 p.m. to 7:00 p.m.;
An information package was distributed at the Public Information Session and the public
was invited to ask questions and provide any comments to TRCA by March 2, 2017.
Seven submissions were received by TRCA.
A summary of the submissions received by the public are attached.
RATIONALE
Staff has reviewed and considered all public submissions and internal and external technical
comments and is recommending that the land be retained at this time for the following reasons:
The land is impacted by geotechnical slope stability concerns with preliminary
investigations indicating that over half the land would be in the slope hazard and 10m
development buffer, with this portion to be retained in TRCA ownership under The Living
City Policies;
At this point, continued ownership by TRCA of the land affected by the slope hazard will
ensure the long term protection of the natural features in the area until the LTSSC can be
determined; and
Retaining the land will facilitate TRCA staff continuing to work with City of Toronto
planning and parks staff to:
identify opportunities for recreation and access to the Humber River;
assess the suitability of the land for use as a parkland as part of the Dundas Street
West Avenue Study and as part of any future redevelopment of the surrounding
area; and
Retention in the immediate short term as open space/parkette is consistent with the
public's view.
Report prepared by: Nadia Wells, extension 5859, George Leja, extension 5342;
Emails: nwells(&trca.on.ca; gleia(&trca.on.ca
For Information contact: Nadia Wells, extension 5859, George Leja, extension 5342;
Emails: nwells(�'ii)trca.on.ca; glela(abtrca.on.ca
Date: August 11, 2017
Attachments: 3
561
Attachment 2
ig '41111111, qg-
Crest of Slope
Long Term Stable Slope (23 m)
Butter Zone (10 m)
l'
-- Dundas St W
x9c
r-
10:-.7
563
Attachment 3 - Summary of Public comments
Summary
Does not support the sale of this property:
There is no pressing reason to sell the land at this time.
There are alternate uses of the property as publicly owned land which should take precedence over sale
to a private individual or developer. There is a need for new parkland and recreational land at street level
on Dundas Street. The property is suitable for use as parkland.
The property is vacant, and is surrounded by heritage -protected properties. Development would create a
barrier to the maintenance of these heritage properties as a unified whole. In addition, sale of this land
opens the door to developers' consolidating land packages in the area and then attempting to overturn
the Heritage designations of these properties.
If the TRCA's decision is to sell the property, a covenant should be attached as a condition of sale,
specifying that the land must be used for purposes and in a built form which is in harmony with current
heritage properties in the same block.
The property in question is close to a huge development on the RONA lands a little further up the street. This
may be the only property that offers a "buffer" to put a check on similar developments. Notwithstanding our
close access to the Humber River parklands, PLEASE consider retaining this property on the north side of
Dundas Street West to allow for a public area that all of the existing and many future residents in the area can
enjoy.
New development that is proceeding in the area, including a new condo development adjacent that will have
impacts on natural light.
This very small parcel of land is very close and gives access to the Humber River parklands, please consider
retaining this property on the north side of Dundas Street West to allow for a public area that all of the existing
and many future residents in the area can enjoy. This would a benefit to the existing community.
Any "green space' that can be held back from the inevitable intensive development along this stretch of
Dundas St. W. will be a huge plus for city planners. This lot is positioned so that it can become a green break,
once the inevitable large developments along this stretch of Dundas take place.
As larger houses keep being built in this area (with the smaller ones being demolished), along with the office
and condo developments, more and more land is being paved over. We need to preserve as much green
space as possible: to soak up water run-off, to help the urban tree canopy (many of the trees in this area are
coming to the end of their natural lives), and to provide more bird and wildlife protection. Bird life and wildlife
in the area has been markedly diminishing over the past few years.
It would be morally wrong for the TRCA to sell it now into private ownership instead of using it for the benefit
of the municipality at large.
With a few benches and garden shades or gazebo structures, the empty piece of land is ideal for seniors, to
go there and relax any time of the day.
There are a couple of retirement homes between the Humber River and Royal York. Seniors, especially with
limited mobility problems or in wheelchairs, can't walk long distance to the park beside the river. The City
should take over the plot of land.
An owner of adjoining property stated they will be affected by what happens on the lot. Would appreciate
being informed of what is going to happen with the property and with the opportunity to purchase it.
564
Does not object to the proposed disposition of the TRCA vacant land and may be interested in purchasing
this land if it becomes surplus to the needs of TRCA.
Has maintained portions of the property as a park since 1986 at his expense. This maintenance has included
snow removal, grass cutting, setting out park benches, and providing additional horticultural vegetation.
The neighbourhood considers 4156 Dundas as a local park. If he was to be the successful purchaser, the
park like setting would be maintained for a certain period of time.
The owners adjoining the 4156 Dundas Street West property should be given consideration during the TRCA
process for the sale.
565
RES.#13110/17- GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Build Toronto Inc., CFN 55477. Acquisition of a conservation easement
located east of Jane Street and north of St. Clair Avenue West — 200
Rockcliffe Court, in the City of Toronto, Etobicoke York Community Council
Area, under the "Greenlands Acquisition Project for 2016-2020," Flood
Plain and Conservation Component, Humber River watershed.
Moved by: Colleen Jordan
Seconded by: Chris Fonseca
THE EXECUTIVE COMMITTEE RECOMMENDS THAT a conservation easement for the
protection of the 350 year storm flood plain, containing 0.41 hectares (1.01 acres), more or
less, of vacant land, located east of Jane Street and north of St. Clair Avenue West — 200
Rockcliffe Court, said land being Part of Lot 37, Concession 3, FTB, designated as Part 28
on a draft Plan of Survey prepared by Rouse Surveyors Inc., under their Reference No.
17-767-02, dated November 14, 2017, in the City of Toronto, Etobicoke York Community
Council Area, be purchased from Build Toronto Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) acquire the conservation
easement free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
MOTION FOR DEFERRAL
Moved by: Glenn De Baeremaeker
Seconded by: Mike Mattos
THAT the item be deferred to Executive Committee Meeting #11/17, scheduled to be held
on January 12, 2017.
THE MOTION FOR DEFERRAL WAS
THE MAIN MOTION WAS
NOT CARRIED
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mr. Michael Whelan, Vice President, Development, Build
Toronto Inc.
Attached is a sketch illustrating the location of the subject lands.
566
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of Consent Application No. 80092/16EYK for commercial development, TRCA staff
established the limits of the conservation easement lands (i.e. Part 1 o draft Plan of Survey)
which are comprised of the 350 -year storm flood plain within the Rockcliffe Special Policy Area
(SPA).
The northern portion of the site is located within the 350 -year storm flood plain and is unsuitable
for development as stipulated in the Rockcliffe SPA policies. The SPA recognizes the existing
commercial and residential development within the Regulatory (i.e. Regional Storm) flood plain
and allows new development/redevelopment in the area outside the 350 year storm flood plain,
subject to new structures being adequately flood proofed to above the Regional Storm flood
elevation.
Build Toronto Inc. has obtained consent to sever its land holdings at 200 Rockcliffe Court and is
currently in the process of selling the severed lot to a commercial business. As described above,
the northern portion of the severed lot is undevelopable and, due to its close proximity to the Black
Creek flood control channel, the area of the 350 -year storm must be kept free and clear of
obstructions. As part of the conditions of the consent application and prior to the sale of the
subject lot, staff requires that Build Toronto Inc. register a conservation easement on title to the
subject lands stipulating that:
No development, parking or outside storage will be permitted within the 350 -year storm
flood plain;
The 350 -year storm area will either be planted with native, low growing shrubs and
grasses or seeded/sodded with grass and, in either case, will be maintained in perpetuity
by the landowner and all future owners, successors, assigns, etc.;
The 350 -year storm area will be kept clean of waste in perpetuity by the landowner and all
future owners, successors, assigns, etc.; and
TRCA will have the ability to enter and use the 350 -year storm area for inspection and
flood control purposes, including any development or infrastructure required for flood
control.
TAXES AND MAINTENANCE
The lands subject to the conservation easement will be transferred into private ownership. As
such, the new owner will be responsible for taxes and maintenance.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: George Leja, extension 5342
Emails: glela(a@trca.on.ca, mfenningp_trca.on.ca
For Information contact: George, extension 5342,
Emails: glelaCcDtrca.on.ca, mfenning(a@trca.on.ca
Date: November 17, 2017
Attachments: 1
567
Mike Fenning, extension 5223
Mike Fenning, extension 5223
RES.#B111/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
Pine Valley (FGH) Inc., CFN 58765. Acquisition of property located south
of Regional Road 7 and west of Pine Valley Drive, municipally known as
4603 to 4611 Regional Road 7, in the City of Vaughan, Regional
Municipality of York, under the "Greenlands Acquisition Project for
2016-2020," Flood Plain and Conservation Component, Humber River
watershed.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.7205 hectares (1.78 acres), more or
less, of vacant land, located south of Regional Road 7 and west of Pine Valley Drive, said
land being Part of Lot 29, Registrar's Compiled Plan 9831 and Part of Lot 4, Registered
Plan 4319, designated as the "Valleyland" block on the draft Plan A101, Site Plan and
Statistics, prepared by Graziani Corazza Architects, dated January 19, 2017 municipally
known as 4603 to 4611 Regional Road 7, in the City of Vaughan, Regional Municipality of
York, be purchased from Pine Valley (FGH) Inc.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest
possible date. All reasonable expenses incurred incidental to the closing for land transfer
tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Mark McConville, Senior Planner, acting as agent for the
owners Pine Valley (FGH) Inc.
Access to the subject lands will be achieved through its frontage off Regional Road 7
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Official Plan Amendment Application 12.004, Zoning By-law Amendment
Application Z.12.010, and Site Plan Application 13.090 for a 14 -storey apartment building
(residential condominium) and a seven -storey rental apartment for seniors, TRCA staff
established the limits of the open space land.
569
TAXES AND MAINTENANCE
Taxes for 2018 have been estimated at $600. Based on TRCA's preliminary review of the
environmental criteria for lands that are eligible to receive a property tax exemption under the
provincial Conservation Land Tax Incentive Program, it would appear that the subject property will
be eligible for a tax exemption. While it is expected that the subject parcel of land will not
significantly impact TRCA's maintenance costs at this location, an assessment of the aggregate
acquisitions in the area will be undertaken and the results will be integrated into TRCA's land
management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(a@trca.on.ca
For Information contact: Nadia Wells, extension 5859, Mike Fenning, extension 5223
Emails: nwells(a)trca.on.ca, mfenning(a)trca.on.ca
Date: November 9, 2017
Attachments: 1
570
RES.#6112/17 GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Humber River Watershed
4208-4214 Dundas Street West (VI) Ltd., CFN 58842. Acquisition of
property located north of Dundas Street West and east of Royal York Road,
municipally known as 4208-4214 Dundas Street West, in the City of
Toronto, under the "Greenlands Acquisition Project for 2016-2020," Flood
Plain and Conservation Component, Humber River watershed.
Moved by: Jack Ballinger
Seconded by: Jennifer McKelvie
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.3650 hectares (0.9109 acres), more
or less, of vacant land, located north of Dundas Street West and east of Royal York Road,
said land being Part of Lot 94, 95 and William Street, Registered Plan 234 and Part of Lot
10, Concession C, Fronting the Humber designated as Parts 7, 8, 9, 10 and 11 on draft
Registered Plan, Drawing No. 10-313RP02 prepared by Krcmar dated August 2017,
municipally known as 4208 to 4214 Dundas Street West, in the City of Toronto, be
purchased from 4208-4214 Dundas Street West (VI) Ltd.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest
possible date. All reasonable expenses incurred incidental to the closing for land transfer
tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Steven Barr, Development Manager, acting as agent for
the owners 4208-4214 Dundas Street West (VI) Ltd.
Access to the subject lands will be achieved via an access easement through the development
site.
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Humber River
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Official Plan Amendment Application and Zoning By-law Amendment Application
Reference No. 14 183631 WET 04 OZ for an eight -storey mixed use building, three-storey
stacked townhouses and 21 -storey residential apartment building, TRCA staff established the
limits of the open space land.
572
TAXES AND MAINTENANCE
This parcel of land will be turned over to the City of Toronto under the terms of the existing
management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Nadia Wells, extension 5859
Emails: nwells(aDtrca.on.ca
For Information contact: Nadia Wells, extension 5859, Mike Ferning, extension 5223
Emails: nwells(cDtrca.on.ca, mfenning(aDtrca.on.ca
Date: November 9, 2017
Attachments: 1
573
chment 1
r
3
...........
�1
subject
operty
L Q �
1
O
O
Legend
Toronto and Region
Conservation YORK DURHAM
/nr The Living City
...... � PEEL
- TORONTO
SITE
Lake Ontario
RES.#B113/17 - LAKE WILCOX SPECIAL POLICY AREA
Comprehensive Policy and Boundary Update, Town of Richmond Hill. The
Town of Richmond Hill is updating the policies and boundary of the Lake
Wilcox Special Policy Area based upon a comprehensive flood risk
management and planning analysis in accordance with provincial
guidelines. The Authority is requested to endorse the proposed Official
Plan Amendment and Zoning By-law Amendment that will implement the
updated Special Policy Area policies and boundary.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS the Town of Richmond
Hill, in collaboration with Toronto and Region Conservation Authority (TRCA), has
undertaken a comprehensive review to update the policies and boundary of the Lake
Wilcox Special Policy Area (SPA) in accordance with provincial guidelines for amending
the policies and boundaries of existing SPAS;
AND WHEREAS the Town of Richmond Hill has proposed amendments to the policies and
mapping in their Official Plan and Zoning By-law associated with the Lake Wilcox SPA,
based upon this comprehensive review;
AND WHEREAS TRCA staff has reviewed the proposed amendments and support the
updates as proposed;
THEREFORE LET IT BE RESOLVED THAT the Authority endorse the request of the Town
of Richmond Hill to update the policies and boundary of the Lake Wilcox Special Policy
Area through an Official Plan Amendment (OPA) and Zoning By-law Amendment for
approval;
AND FURTHER THAT the Town of Richmond Hill, the Region of York, the Ministry of
Municipal Affairs and the Ministry of Natural Resources and Forestry be so advised by the
CEO's Office.
CARRIED
BACKGROUND
A "Special Policy Area" designation is a planning mechanism provided by the Province of Ontario
to recognize the unique circumstances of historic communities that existed within flood vulnerable
areas prior to the implementation of a provincial flood hazard planning policy and where it has
been demonstrated that the application of other provincial flood hazard planning management
approaches (One Zone or Two Zone) would not allow for the continued social and economic
viability and revitalization of these areas. New SPAS and any amendments to the policies, land
use designations or boundaries of existing SPAs must be approved by both the Minister of
Municipal Affairs and the Minister of Natural Resources and Forestry because they allow for
reductions to provincially prescribed floodproofing standards within these areas, where this is
deemed appropriate. As stated in the Provincial Policy Statement (PPS), SPAs are not intended
to allow for new or intensified development, if a community has feasible opportunities for
development outside the flood plain.
6wi
The proposal for a new SPA or modifications to the boundaries or policies of an existing
provincially approved SPA may only be initiated by lower -tier or single -tier municipalities as the
proponent. Such proposals must be undertaken in accordance with the Ministry of Natural
Resources and Forestry Technical Guide, Appendix 5 — River and Stream Systems: Flooding
Hazard Limit, "Procedures for Approval of New Special Policy Areas (SPAs) and Modifications to
Existing SPAs Under the Provincial Policy Statement, 2005 (PPS, 2005), Policy 3.1.3 — Natural
Hazards — Special Policy Area, dated January 2009". The policies and boundaries of an SPA
are determined through a consultative process between the municipality, TRCA, Ministry of
Municipal Affairs (MMA) and the Ministry of Natural Resources and Forestry (MNRF), to the SPA
policies and mapping in a municipality's Official Plan and Zoning By-law. These site specific
SPA policies are used by TRCA staff to inform the standards applied within these areas through
TRCA's regulatory permitting responsibilities under Section 28(1) of the Conservation Authorities
Act.
The existing Lake Wilcox SPA is located within the Humber River watershed on the north side of
Lake Wilcox and west of Yonge Street, on the north and south sides of King Road (Attachment 1).
The policies and boundary of the existing Lake Wilcox SPA were approved by an Order of the
Ontario Municipal Board (OMB) respecting OPA 129 (the former North Urban Area Secondary) on
July 10, 1995.
On July 12, 2010, the Town of Richmond Hill Council adopted anew Official Plan (OP). The OP
included direction to undertake a review of the Lake Wilcox SPA in order to update the existing
policies and mapping. The OP contains SPA policies (Section 3.2.2.4) which were largely
carried forward from OPA 129, with minor modifications to be consistent with the PPS, 2005.
The recommendations of this report are based on the outcome of the comprehensive SPA policy
and boundary review process that has now been completed.
RATIONALE
The proposed policy and boundary modifications to the Lake Wilcox SPA reflect a collaborative
and consultative effort between staff from the Town of Richmond Hill, TRCA (policy, planning and
engineering staff), MMA and MNRF. This process was undertaken to ensure consistency with
the PPS, 2014 and informed by updated flood plain mapping for the area. The provincial approval
procedures require an endorsement of the proposed updated SPA policies and boundary by
Town Council as part of the Town's final submission package to the Province of Ontario. A
similar endorsement from the Authority is also required. On October 10, 2017, Town Council
approved in principle the Draft Official Plan Amendment and Draft Zoning By-law Amendment as
detailed in the staff report to the Committee of the Whole held on October 2, 2017 (Link to Staff
Report).
9• • •1:M3!Vi7[iLiifa 73�'dtlC�T y�t1
A fundamental element of the comprehensive SPA review was to update the boundary of the SPA
based upon current flood plain mapping. Flood plain mapping for the East Humber River area
was updated in 2014 in accordance with the methodology and specifications for regulatory
mapping prescribed by the Ministry of Natural Resources and Forestry (Technical Guide -River
and Stream Systems: Flooding Hazard Limit, 2002).
576
TRCA prepared a series of maps to illustrate the current technical flood plain information to inform
and assist the Town with the risk analysis, land use and emergency management components of
the SPA review. This included maps illustrating flood depths and velocities for both the
Regulatory (Regional/Hurricane Hazel) Flood event and the 1:350 year storm. Modelling shows
that flood depths during a Regulatory Flood will range from 0 to 3 metres, with the majority of the
SPA experiencing) to 2 metres depth of flooding near the shoreline of Lake Wilcox. Under the
1:350 year storm (more frequent), flood depths are for the most part within the 0 to 2 metre range,
with depths up to 3 metres noted within the valley system upstream (east) of Yonge Street.
In addition, TRCA generated a Regional Risk analysis map (Attachment 2) in accordance with
criteria set by MNRF to identify areas within the SPA where flood depths and velocities would be
considered low risk (safe for vehicular and pedestrian access/egress); medium risk (safe for
pedestrian access/egress only); and high risk (potentially unsafe for both). The risk assessment
determined that the majority of the SPA is within the high risk area. As the velocities of flood
waters in a Regional storm event in the SPA are generally low, the risk criterion is exceeded on
the basis of depth of flooding.
Flood Mitigation Options
As part of the SPA review, Burnside Consulting was retained by TRCA and the Town of Richmond
Hill to investigate alternatives for reducing or eliminating the flood vulnerabilities in the SPA. The
study looked at the mechanisms of flooding that govern the flood limits within the Lake Wilcox
area. Where distinct causes were identified, potential opportunities to reduce the aggregate
flood risk within the SPA were identified, and the benefits and costs of such alternatives assessed
in a preliminary manner. The study concluded the primary influence on the flood levels within the
SPA is a result of the relatively flat topographic profile of the area downstream of Lake Wilcox in
combination with the culvert at Yonge Street into which the Lake Wilcox outlet channel
discharges. During the Regulatory storm event, the culvert does not have sufficient capacity to
convey the Regulatory flows downstream, resulting in floodwaters building up in the valley/flood
plain behind Yonge Street. Flood depths on the upstream (east) side of Yonge Street eventually
reach a level that allows water to flow over and across Yonge Street, and into the East Humber
River on the downstream (west) side of Yonge Street.
A number of alternatives for remediation or elimination of flood risk within the SPA were identified,
all centered on improvements to the capacity of the crossing at Yonge Street (e.g. box culverts,
clear -span bridge). None of the alternatives investigated had the ability to remove all vulnerable
structures from the flood plain, as the relatively flat topography within the overland areas in the
SPA promotes a wide, shallow flood plain under expected flow conditions. It would require major
engineering works, including regrading of the shoreline of the lake to eliminate the wide shallow
flood plain that exists. Ultimately, the major engineering works required, and their associated
costs, would not result in the removal of all vulnerable structures from the flood plain.
Emergency Management
Emergency management and planning plays an important role in minimizing the risk to public
health, safety and property damage within the Lake Wilcox SPA. The Town of Richmond Hill and
TRCA work closely together to ensure that the most current flood risk information is shared to
facilitate the coordination of flood forecasting and emergency planning. TRCA operates a Flood
Forecasting and Warning System that monitors watershed and weather conditions daily in order
to issue timely warning of anticipated or actual flood conditions. Conditions during a flood event
are closely monitored by TRCA and communicated to the municipality. As with all emergencies,
municipalities have the primary responsibility for the welfare of residents and incorporate flood
emergency response into municipal emergency planning.
577
In addressing the provincial SPA guidelines, the Town's emergency management policies and
procedures, as outlined in Richmond Hill's Emergency Plan, were reviewed with the Town's Fire
and Emergency Management staff and included in the SPA Justification Report to demonstrate
how the Fire and Emergency Services group would be deployed in an emergency situation,
including a potential flood event.
Special Policy Area Planning Justification
A comprehensive policy and land use planning analysis was undertaken in accordance with the
requirements of the provincial SPA guidelines. The findings of the technical analysis (flood plain
characterization, analysis of risk, flood plain remediation assessment and assessment of
emergency management) and the land use planning analysis (policy context, assessment of
existing conditions and land use vision established by the 2010 Official Plan) established the
basis for the recommended boundary revisions and policy modifications for the Lake Wilcox SPA.
Planning principles were developed to guide the SPA boundary revisions. Generally speaking,
principles for removing lands from the existing SPA included: the removal/or reduction in the flood
plain area based on the updated mapping; lands designated as part of the Greenway System (as
defined by the OP 2010); and potential for expansion of existing uses outside of the flood plain.
Principles for adding lands to the SPA included: the expansion of the flood plain; the location of
lands within various categories of risk as defined by the major storm event; and the impact to the
viability/continuation of existing uses in light of the PPS, 2014 policies for natural hazard lands.
The proposed SPA boundary resulting from this review process includes the existing residential
development on the north side of Lake Wilcox as identified in the attachments to this report.
The Town has prepared a draft Official Plan Amendment (OPA) and draft Zoning By-law
Amendment (ZBA) to be consistent with current provincial legislation and implement the outcome
of the comprehensive SPA review. The following is a summary of changes:
the OP's Natural Hazard (3.2.2.3) and Special Policy Area (Section 3.2.2.4) policies have
been modified to reflect the policy language of the PPS, 2014;
clarification that modifications to SPA boundaries, land use designations and/or policies
require the approval of the Ministers of MMA and MNRF;
clarification on the range of permitted and prohibited uses, technical/flood proofing
standards and safe access/egress requirements;
residential use permissions for SPA lands within the "Neighbourhood" designation will be
limited to single detached dwellings;
continuation of policy from OP 2010 that prohibits new lot creation within natural hazard
lands, including the SPA;
amending the Zoning By-law with a "Special Policy Area" overlay to implement updated
regulatory standards associated with the SPA; and
prohibiting secondary suites within the SPA as a measure to minimize the risk to life and
property.
The comprehensive SPA review was subject to a public/landowner consultation process as per
the requirements of the provincial SPA guidelines and as prescribed under the Planning Act.
TRCA staff is satisfied that the Draft OPA and ZBA capture TRCA's planning and regulatory
interests, roles and responsibilities for development within the SPA. Staff recommends that draft
amendments be supported.
578
DETAILS OF WORK TO BE DONE
The following is a summary of the concluding steps in the process to update the Lake Wilcox SPA
boundary and policies, in accordance with the provincial guidelines:
Town Council approval in principle of the Draft Official Plan Amendment and Draft Zoning
By-law Amendment (October 10, 2017);
TRCA resolution of endorsement of the Draft OPA and ZBA;
Region of York resolution of endorsement of the Draft OPA and ZBA;
Council, TRCA and York resolutions forwarded to MMA and MNRF;
Submission of final/formal documentation to the Province for approval;
Ministers of MMA and MNRF issue a decision;
Town Council adopts the OPA and enacts ZBA and, with respect to the OPA, approval by
the Region of York.
FINANCIAL DETAILS
Funding for the flood plain modelling was provided by the Region of York under account 127-90
and funding was provided by the Town of Richmond Hill for the flood plain mapping. Funding to
support policy and planning input and GIS services for mapping products was provided by the
Region of York under accounts 120-12 and 120-19.
CONCLUSION
The Town of Richmond Hill, in collaboration with TRCA, has undertaken a comprehensive review
of the Lake Wilcox Special Policy Area in accordance with provincial guidelines for amending the
policies and boundaries of existing SPAs. The SPA Planning Justification is based upon a flood
risk assessment using the most current flood plain management information for the East Humber
River to inform land use and emergency planning. The development of the Town's submission,
including the SPA Justification Report, Draft OPA and ZBA, has been subject to extensive
discussions with MMA and MNRF staff to ensure that their comments have been addressed. On
this basis, TRCA staff recommends that the Authority support the proposed updates to the Lake
Wilcox SPA boundary and policies as outlined in this report in order to advance to the next steps
of the Provincial approval process.
Report prepared by: Laurie Nelson, extension 5281; Quentin Hanchard, extension 5324
Emails: InelsonCciltrca.on.ca, ghanchard(dtrca.on.ca
For Information contact: Laurie Nelson, extension 5281;
Quentin Hanchard, extension 5324
Emails: Inelson(Wtrca.on.ca, ghanchardptrca.on.ca
Date: November 23, 2017
Attachments: 2
579
Attachment 1
El
• '
• J
Attachment 2
`•l• lu
RES.#B114/17 - EAST DON TRAIL CONSTRUCTION PROJECT — PHASE 1 AND
PHASE 2
Design -Build Request for Proposal #10005933 —Phase 1 and
Design -Build Request for Proposal #10006438 — Phase 2. Award of
Contract #10005933 and Contract #10006438 for engineering and
construction services in support of Phase 1 and Phase 2 of the East Don
Trail Project, in the City of Toronto.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract #10005933 for engineering
and construction services in support of Phase 1 of the East Don Trail Construction
Project, in the City of Toronto, be awarded to Metric Contracting Services Corporation at a
total cost not to exceed $9,949,934.01, plus HST, as they are the lowest bidder that best
meets Toronto and Region Conservation Authority (TRCA) specifications;
THAT Contract #10006438 for the engineering and construction services in support of
Phase 2 of the East Don Trail Construction Project, in the City of Toronto, be awarded to
Metric Contracting Services Corporation at a total cost not to exceed $9,797,493.62, plus
HST, as they are the lowest bidder that best meets TRCA specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 15%
of the contract cost for each contract as a contingency allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take any action necessary
to implement the contract including obtaining any required approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
The East Don Trail Project is being completed by the City of Toronto in partnership with TRCA
and in coordination with the City's consultant, Aquafor Beech Ltd. The purpose of the East Don
Trail Project is to create a key connection in the City of Toronto's multi -use trail system while
providing safe and equitable access to nature and recreational opportunities for the public, and to
create a safe travel route. A significant gap in the multi -use trail network currently exists within the
East Don Corridor between the existing East Don Trail (east of Wynford Heights Crescent), the
future Meadoway trail (at approximately Bermondsey Road), and the Lower Don Trail System.
The proposed East Don Trail will fill this gap, creating a continuous connected trail network. In
addition, a section of the East Don Trail will realize one of the strategic connections of the Pan Am
Path, a multi -use path connecting Toronto trails and creating an active -living legacy for the
TORONTO 2015 Pan Am/Parapan Am Games.
The City of Toronto's Bikeway Trails Implementation Plan identified the need for a trail connection
in the East Don Corridor, while the East Don Trail Master Plan Update, completed in 2012,
determined that the trail connection was feasible and recommended that further environmental
studies were necessary.
582
The Bikeway Trails Implementation Plan was approved by City Council on June 6, 2012 with the
following direction:
City Council authorize the Acting General Manager, Transportation Services, the General
Manger, Parks, Forestry and Recreation and, where appropriate, TRCA, to undertake and
manage any Environmental Assessment studies required for the new trail connections
contained in the Bikeway Trails Implementation Plan and file the Environmental Study
Report with the Ministry of the Environment and Climate Change as necessary; and
City Council authorized the Acting General Manger, Transportation Services, and General
Manger Parks, Forestry and Recreation and, where appropriate, TRCA to undertake site
assessments, design, public consultation, project management and construction of the
new trail connections contained in the Bikeway Trails Implementation Plan.
At Authority Meeting #5/12, held on June 22, 2012, Resolution #A98/12 was approved for TRCA
to undertake the Environmental Assessment (EA), as well as, the management of the design and
construction of the East Don Trail. After consultation with the Ministry of the Environment and
Climate Change (MOECC), the City of Toronto and TRCA initiated the East Don Trail Municipal
Class Schedule C EA in 2013. Through extensive public consultation, the EA identified,
evaluated and selected a preferred route for the East Don Trail. The Environmental Study Report
for the EA was filed with MOECC for a 30 -day public review period and was subsequently
approved in November 2017.
The recommended solution (preferred trail route), as documented in the Environmental Study
Report, is a 3.6 to 4 metre -wide by approximately 5 kilometres long, asphalt multi -use trail routed
within the East Don Corridor (not including access routes). The route includes nine bridges over
the East Don River, one over Taylor Massey Creek (constructed by City of Toronto) and two over
drainage tributaries, as well as five crossings of the Metrolinx railway corridor.
The preferred trail route has been divided into three distinct phases for detailed design and
construction, with Phases 1 and 2 being prioritized. Phase 1 spans from the Lower Don Trail to
the future Meadoway at Bermondsey Road, while Phase 2 spans from the existing East Don Trail
off Wynford Heights to Eglinton Avenue. Phase 3 will span from approximately Eglinton Avenue to
connect to Phase 1, and has been deferred to a later date.
Attachment 1 is a map illustrating the location of Phase 1, Phase 2 and Phase 3, respectively.
Phase 1 and 2 of the East Don Trail project has been identified as one of the initiatives that will be
funded under the federal Public Transit Infrastructure Fund (PTIF), covering up to 50 per cent of
the design and implementation. Announced in the 2016 Federal Budget, PTIF provides short-term
funding to help accelerate municipal infrastructure investments over a 10 year period.
Based on staff expertise, familiarity with the project, and responsibility for ownership of some of
the lands located in the study area, TRCA has been requested to lead the implementation of the
East Don Trail, in collaboration with the City of Toronto, Transportation Services and Parks,
Forestry and Recreation staff.
The scope of work for Phase 1 and Phase 2 consists of the construction of approximately 5.4
kilometres of multiuse asphalt trail including:
Site preparation and removals;
Erosion and sediment control (ESC) and dewatering measures;
583
Installation of nine temporary bridge crossings;
Two at grade level crossings over the Metrolinx GO Line;
Design -Build of nine permanent corten steel pedestrian bridges;
Design -Build of three permanent corten steel boardwalks;
Asphalt trail construction including line painting;
Drainage control and channel works;
Bank stabilization works;
Signage;
Resting areas and entry nodes; and
Site restoration.
RATIONALE
Request for Pre -Qualification (RFPQ) statements for general contractors to provide engineering
and construction services for the East Don Trail Construction Project was publicly advertised on
the electronic procurement website Biddingo (www.biddingo.com) on May 31, 2017. General
contractors interested in pre -qualifying were advised that the criteria for evaluation would include
the following in order to receive a tender package:
Completeness of submission;
Past experience with multi -use trail (asphalt) construction within Environmentally
Sensitive Areas;
Design -Build of pedestrian bridges over river networks;
Installation of temporary at -grade crossings and use of flagmen for Metrolinx railway
crossings,
Ability to meet construction schedule milestones;
Ability to coordinate work by others;
Experience dealing with and projects with construction budgets of $10,000,000.00; and
Experience working with, around Metrolinx/GO rail lines, Enbridge pipelines, and within
hydro corridors.
On June 22, 2017, TRCA received pre -qualification submissions from the following 15 general
contractors:
Brennan Paving & Construction Ltd.;
Bronte Construction Ltd.;
Cedar Springs Landscape Group;
Dagmar Construction Inc.;
Dynex Construction Inc.;
Esposito Bros Construction Ltd.;
Four Seasons Site Development Ltd.;
Gazzola Paving Ltd.;
Grascan Construction;
LocPave Construction;
McPherson -Andrews Contracting Ltd;
Metric Contracting Services Corp.;
Midome Construction Services Ltd.;
R&M Construction; and
Soncin Construction.
.A
Following receipt of the submissions, pre -qualifying documents were reviewed by the selection
committee made up of TRCA staff. Evaluations were based on the criteria defined above. Based
on the evaluation process, Design -Build Tender documents for Phase 1 and Phase 2 were made
available on October 27, 2017 to the following nine general contractors:
Brennan Paving & Construction Ltd.;
Dagmar Construction Inc.;
Dynex Construction Inc.;
Grascan Construction;
LocPave Construction;
McPherson -Andrews Contracting Ltd;
Metric Contracting Services Corp.;
R&M Construction; and
Soncin Construction.
A mandatory bidders meeting/site tour for Phase 1 was held on November 2, 2017 and for Phase
2 on November 3, 2017. Design -Build Request for Proposals closed on November 24, 2017. The
Design -Build Request for Proposal (RFP) was scored using a two -envelope system. Envelope
one contained the technical components of the RFP and envelope two contained the fee
components of the RFP. Technical proposals were reviewed by the evaluation committee,
separate from the fee proposals, based on the following criteria:
The results of the technical evaluation were then compiled using the weighted scoring system
shown above including 10% of the value of the points the proponent earned during the Request
for Prequalification stage of the project. The weighted scoring of the fee proposal (65%) was
calculated using the following formula: Number of Points = Lowest Fee / Proponent Fee x 65
points.
The final results of the evaluation of the received proposals for Phase 1 and Phase 2 of the
Project are as follows:
Design -Build Request for Proposal #10005933 — Phase 1
PROPONENT
Criteria
Weight
1.
Conformance with terms of the RFP
5
2.
Understanding of Project and Scope of Work
5
3.
Approach and Methodology for the Services
10
4.
Expertise and availability of Project Team and Schedule
5
5.Pre
ualification of General Contractors
10
6.
Fee Proposal
65
Total Weighted Points
100
The results of the technical evaluation were then compiled using the weighted scoring system
shown above including 10% of the value of the points the proponent earned during the Request
for Prequalification stage of the project. The weighted scoring of the fee proposal (65%) was
calculated using the following formula: Number of Points = Lowest Fee / Proponent Fee x 65
points.
The final results of the evaluation of the received proposals for Phase 1 and Phase 2 of the
Project are as follows:
Design -Build Request for Proposal #10005933 — Phase 1
PROPONENT
TOTAL TENDER AMOUNT
Plus HST)
Overall
Rankin
Metric Contracting Services
Corporation
$9,949,934.01
1
Grascan
$11,067,000.00
2
Soncin Construction
$10, 873,236.00
3
Dynex Construction Inc.
$13,079,053.00
4
Design -Build Request for Proposal #10006438 — Phase 2
PROPONENT
TOTAL TENDER AMOUNT
Plus HST
Overall
Ranking
Metric Contracting Services
Corporation
$9,797,493.62
1
Grascan
$11,327,000.00
2
Soncin Construction
$11,370,087.75
3
Dagmar Construction
$14,682,198.55
4
Dynex Construction Inc.
$13,803,605.00
5
Based on the results from the evaluation process it was determined that the technical and fee
proposal submitted by Metric Contracting Services Corporation was the highest ranked proposal
meeting the needs of TRCA's project and offering the best value for services.
FINANCIAL DETAILS
Funding for this project is coming from the City of Toronto Transportation, Cycling Infrastructure,
and Parks Forestry and Recreation, Capital Projects. A portion of the funds will be provided
through the federal Public Infrastructure Fund, and administered through the City of Toronto.
Award of Contract #10005933 and Contract #10006438 will be subject to TRCA negotiating an
agreement with the City of Toronto.
Report prepared by: Michelle Guy, extension 5905
Emails: mciuv(dtrca.on.ca
For Information contact: Mark Preston, extension 5848
Emails: mpreston(dtrca.on.ca
Date: November 17, 2017
Attachment: 1
Me
1
kYesr
Lower Don
Trail \�
-----Legend
GF"TEWgye
0
Existing Don Trail NXGVAOpE Op
♦— Wigmore
f\ _ Park
op PHASE 2�
TRAI LC
Gatineau
CorridorTrl
y ``\``° 9Q gUC1p\SE PVE
o F1
PHASE 1 °
TRAIL
PARKVIEW H\L`-GPS
TaY/or Mass eY G,ee
Toronto and Region
Conservation
for The Living City -
NO
CGR�rY
g�F
Lake Onfano
RES.#B115/17 - KORTRIGHT VISITOR'S CENTRE RENOVATION PROJECT
Contracted Construction Services for Renovations to Washrooms and
Classrooms. Award of Contract #10006491 for contracted construction
services to undertake renovations of the washrooms and classrooms at the
Kortright Centre's Visitor's Centre.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract #10006491 for contracted
construction services, including hazardous material abatement, to undertake renovations
of the washrooms and classrooms at the Kortright Centre's Visitor's Centre be awarded to
Anacond Contracting Inc. at a total cost not to exceed $373,563.05, plus HST, as they are
the lowest bidder that best meets TRCA specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 25%
of the contract cost as a contingency allowance if deemed necessary;
THAT staff be authorized to direct Anacond Contracting Inc. to proceed immediately, upon
approval by the Executive Committee, with the labour, material and equipment to perform
asbestos and other hazardous material abatement prior to removals and renovations,
during the holiday closure and into January, to mitigate health and safety concerns, as
well as disruptions to organized events and to staff;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take such action as is
necessary to implement the contract, including obtaining any required approvals and the
signing and execution of documents.
CARRIED
BACKGROUND
The Visitor's Centre at the Kortright Centre for Conservation is the hub of all the recreational
programs and activities that are featured in the building and outdoors. The many thousands of
visitors at Kortright are welcomed through environmental education programs, special events,
green energy and sustainable technology workshops and cultural heritage community festivals.
As such, the pressures placed on the late 1970's built building has become evident in need of
repair and improvements.
Early in 2017, staff at Kortright submitted an application as part of the Canada 150 Community
Infrastructure Program offered by the Federal Economic Development Agency for Southern
Ontario. The goal of the program is to renovate, expand and improve existing community
infrastructure assets. A non -repayable contribution of $200,000 was awarded to the Kortright
Centre in support of the proposed renovations put forward in the application. The proposed works
in the application included upgrades to the building fire alarm system, renovations to the
washrooms and Accessibility for Ontarions with Disabilities Act (AODA) compliant upgrades to
entrance doors, replacement of the service counter, addition of a building automation system, and
renovations to the classrooms facilities.
With limited funding for these improvements, priority items were selected based on a combination
of rectifying building deficiencies and removing accessibility barriers to meet the needs of its
increasing user base. The scope of work for this design consists of upgrades to the aging men's
and women's washroom facilities which includes new flooring, tiling, plumbing, inclusion of barrier
free washrooms, accessible counter space, automatic fixtures and new LED lighting. A portion of
the work will also include the remediation of asbestos containing material identified in the original
drywall. The six classrooms located on the lower level will be retrofitted with new flooring, dry
walling, LED lighting fixtures and new paint. The improvements within these two areas will greatly
enhance the overall experience of users to the Kortright Centre Visitor's Centre. In order to
minimize disruption to events and school programs, renovation and construction activities at the
Kortright Visitor's Centre are limited to mid-December through mid-January for upgrades to the
washroom facilities and classrooms.
RATIONALE
Request for Tender (RFT) documents were publicly advertised on the electronic procurement
website Biddingo (www.biddingo.com) on November 15, 2017. The tender provided drawings and
specifications on labour, materials and equipment, including the hazardous material abatement
requirements to undertake the proposed renovations. A mandatory site information meeting was
held on November 17, 2017.
Request for Tender documents were received by 23 general contractors, six of which submitted a
bid. The Procurement Opening Committee publicly opened the tenders on November 30, 2017.
Members of the Selection Committee consisting of TRCA staff (Aaron D'Souza, Adrian O'Driscoll
and Chris Ellis) reviewed the submissions and evaluated them based on cost, qualifications and
the ability to complete the project within the specified construction window.
The results of the evaluation are as follows:
Bidder
Bid Price
Anacond Contracting Inc.
$373,563.05
Norfield Construction Inc.
$430,656.78
ICIR Construction Ltd.
$441,700.00
R -Chad General Contracting Inc.
$505,000.00
MIR Construction Inc.
$531,000.00
Trustco Construction Ltd.
$588,000.00
TRCA staff reviewed the bids against its own cost estimates and has determined that the bids are
of reasonable value.
Based on an evaluation of the bids received and a review of provided references, staff
recommends that Contract #10006491 be awarded to Anacond Contracting Inc. for a total cost
not to exceed $373,563.05, plus a 25% contingency, plus HST, as they are the lowest bidder that
meets TRCA specifications. In addition, staff recommends that work to perform asbestos
abatement and removals, as well as the renovations to the washrooms be initiated by December
26, 2017 prior to final approval at Authority Meeting #10/17, scheduled to be held on January 5,
2018.
FINANCIAL DETAILS
Funds for this project are available through account 425-20, Kortright Visitor Centre Canada 150
Infrastructure Grant. This account is funded by the Federal Economic Development agency of
Southern Ontario ($200,000) and with matching TRCA moneys ($203,000).
Report prepared by: Natalie Racette, extension 5603
Emails: nracette(a)trca.on.ca
For Information contact: Aaron D'Souza, extension 5775;
Adrian O'Driscoll, 905-832-2289 extension 240
Emails: aodriscoll(&trca.on.ca
Date: December 4, 2017
590
Section II — Items for Executive Action
RES.#6116/17 - ROOF AND EAVES TROUGH REPLACEMENTS FOR ROUGE PARK
RESIDENTIAL RENTAL PORTFOLIO
Award of Contract #10005456 for Roof and Eaves Trough Replacement for
nine locations within TRCA's Rouge Park residential portfolio located in the
cities of Toronto and Markham.
Moved by: Colleen Jordan
Seconded by: Glenn De Baeremaeker
THAT Contract #10005456 for Roof and Eaves Trough Replacement for nine locations
within Toronto and Region Conservation Authority's (TRCA's) Rouge Park residential
rental portfolio in the cities of Toronto and Markham be awarded to Tony K. Roofing Inc.
for a total cost not to exceed $131,640, plus 20% contingency to be expended as
authorized by TRCA staff, plus HST;
AND FURTHER THAT authorized staff be directed to take the necessary action to
implement the contract including the signing and execution of documents.
CARRIED
BACKGROUND
It is TRCA's continuing objective to regularly assess the ongoing operational and capital
investment requirements to maintain the dwellings within its residential portfolio as per the
standards of the Residential Tenancy's Act and applicable regulations.
Roof and/or eaves trough replacement is required at 13 locations within the Rouge Park
residential rental portfolio, as the roofs and/or eaves trough, have deteriorated sufficiently and
warrant their replacement in order to avoid additional interior and exterior structural damages.
Seven of these 13 locations are historically designated.
It is to be noted that the locations included in RFT #10005456 are anticipated to be transferred to
Parks Canada in 2018.
RATIONALE
RFT #10005456 was publically advertised on Biddingo (www.biddingo.com) and bids were
received from three contractors: Tony K. Roofing Inc., Eileen Roofing Inc. and AAA Roofmaster
Ltd. The RFT documentation requested each of the locations to be priced separately. Bids
received were opened by TRCA staff (Nick Tanczos, Lisa Moore, Judith Reda and Lori Colussi)
on September 8, 2017 with the following results:
Site (` represents
historically
significant dwelling)
Tony K. Roofing
Inc.
(Plus HST)
AAA Roofmaster
Ltd.
(Plus HST)
Eileen Roofing
Inc.
(Plus HST)
Contract
Recommended for
Award
'19 Beare Road,
Scarborough
$50,000
$48,660
$52,850
Tony K. Roofing Inc.
Cedar Shake Option 1
'19 Beare Road,
Scarborough
$28,900
$25,233
$26,970
This option not being
Conventional Shingle
awarded
Material Option 2
591
*7551 Reesor Road,
Markham
$10,500
$10,721
$11,200
Tony K. Roofing Inc.
7607 Reesor Road,
$6,580
$7,129
$6,800
Tony K. Roofing Inc.
Markham
7659 Reesor Road,
$6,460
$6,992
$7,560
Tony K. Roofing Inc.
Markham
7733 1411 Avenue,
Markham
$20,980
$23,360
$21,830
Tony K. Roofing Inc.
*7914 1411 Avenue,
$3,640
$3,792
$4,220
Tony K. Roofing Inc.
Markham
*20 Beare Road,
Scarborough
$5,100
$5,850
$5,350
Tony K. Roofing Inc.
1201 Sewells Road,
Scarborough
$14,400
$15,300
$13,780
Tony K. Roofing Inc.
1203 Sewells Road,
$13,980
$14,629
$15,250
Tony K. Roofing Inc.
Scarborough
9183 Reesor Road,
$25,900
$23,475
$24,710
AAA Roofmaster
Markham
Ltd.
*7273 14th Avenue,
$17,580
$17,375
$16,150
AAA Roofmaster
Markham
Ltd.
*9035 Reesor Road,
$4,850
$4,650
$4,450
AAA Roofmaster
Markham
Ltd.
*9 Reesor Road,
Scarborough
No bid
$96,395
$96,750
Not being awarded
TRCA staff is recommending that Eileen Roofing Inc. not be awarded work under RFT #10005456
as there are current ongoing performance and deficiency issues still being addressed for a
previously awarded project for roof and eaves trough replacement under Contract #10002463.
TRCA staff has yet to undertake final inspection and be satisfied with the work completed, and to
determine whether any further action is necessary in order to appropriately resolve the project.
The residence at 19 Beare Road, Scarborough is an historically designated building, currently
being rented by Parks Canada for their staff use. This location has a mix of both cedar shake
shingles and conventional shingles. Contractors were asked to provide quotes on two options: i)
conventional roofing material; ii) cedar shake roofing material. Given this location's impending
transfer to Parks Canada, Parks Canada has requested the roof replacement be completed using
cedar shake roofing material and by a contractor experienced in using these materials.
The Federal Heritage Building Review Office (FHBRO), a division of the federal government, is
currently reviewing this building as they believe it may meet their heritage requirements, and
therefore have requested the cedar shake option. As Tony K. Roofing Inc. has recently
completed roof repair work at 19 Beare Road, Scarborough, to the satisfaction of both TRCA and
Parks Canada, it is recommended that Tony K. Roofing Inc. be awarded the roof replacement
work for 19 Beare Road, Scarborough. Tony K. Roofing has carried out numerous repairs for the
TRCA. They have demonstrated excellent workmanship. Parks Canada has confirmed that
Tony K. Roofing Inc.'s experience with cedar shake roofing, as well as the materials that will be
used, meet their FHBRO requirements. Parks Canada will be reimbursing TRCA for the cost of
this work as per the Interim Management Agreement (IMA), and are aware of Tony K. Roofing
Inc.'s bid price.
592
Under RFT #10005456, it is being recommended for approval by the CEO that roof and eaves
trough replacement for three locations within TRCA's Rouge Park residential rental portfolio be
awarded to AAA Roofmaster Ltd. for a total cost not to exceed $45,500, plus 20% contingency to
be expended as authorized by TRCA staff, plus HST, as per the approval limits of TRCA's
Purchasing Policy, as AAA Roofmaster Ltd. is the lowest bidder for these locations. The three
locations are 9183 Reesor Road, 7273 14th Avenue, and 9035 Reesor Road, in the City of
Markham.
The slate roof replacement at 9 Reesor Road, Scarborough, will not be awarded at this time given
the high bid results for this residence, and budgetary constraints.
Based on bids received, staff recommends that for nine of the locations referenced in Contract
#1005456 for Roof and Eaves Trough Replacement, be awarded to Tony K. Roofing Inc.
FINANCIAL DETAILS
Park's Canada will reimburse TRCA for all expenses incurred for the roof replacement at 19
Beare Road, Scarborough, as per the IMA. Funding for the remaining Rouge Park Residential
Portfolio is provided primarily through rental income.
Report prepared by: Lisa Valente, extension 5297
Emails: Ivalente(a)trca.on.ca
For Information contact: Lori Colussi, extension 5303
Emails: Icolussino.trca.on.ca
Date: November 17, 2017
593
RES.#6117/17 - SUSTAINABILITY CONSULTING SERVICES
Preferred Source Contract #10006760. Award of Contract #10006760 for
professional consulting services to develop the sustainability program and
manage the sustainability certification process in support of Toronto and
Region Conservation Authority's new administrative office building located
at 5 Shoreham Drive, Toronto.
Moved by: Chris Fonseca
Seconded by: Colleen Jordan
THAT Contract #10006760 for professional sustainability consulting services to develop
the sustainability program and manage the sustainability certification process in support
of an Administrative Office Building for Toronto and Region Conservation Authority
(TRCA) be awarded on a preferred source basis to Green Reason Inc., at a total cost not to
exceed $87,500.00, plus 10% contingency, plus HST;
AND FURTHER THAT authorized officials be directed to take the necessary action to
implement the contract including obtaining necessary approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
At Authority Meeting #5/16, held on June 24, 2016, Resolution #A85/16 approved the
construction of an administrative office building at 5 Shoreham Drive in the City of Toronto and
directed staff to take the necessary action to complete the Project, including the submission of
formal requests for approval to the participating municipalities and the Province of Ontario. Staff
reported at Authority Meeting #1/17, held on February24, 2017 that all six of TRCA's participating
municipalities, by way of their respective Councils, had approved the Project and the allocation of
$60,000,000 in new and existing capital funding toward the Project.
In May 2017, TRCA retained Jones Lang LaSalle Canada (JLL) as its project managers for the
Project. TRCA then retained the services of an integrated design team, led by ZAS Architects and
Bucholz McEvoy Architects, to proceed with the development of the project design, approvals and
construction documents. TRCA has also engaged Eastern Construction Ltd. to provide
pre -construction services throughout the design and tendering stages, manage construction of
the new facility, coordinate commissioning and operational start-up, and associated site works.
RATIONALE
TRCA has targeted to achieve Leadership in Energy and Environmental Design (LEED) Platinum,
WELL Building Silver certifications and at minimum Toronto Green Standard (TGS) Tier 2 for the
new administrative office building at 5 Shoreham Drive. The project has also been approved by
the Canada Green Building Council as a pilot study participant under their Zero Carbon Building
Standard. To achieve these ambitious sustainability targets, TRCA staff requires the support of a
sustainability consultant to develop a sustainability strategy and to coordinate and manage the
certification process.
Green Reason Inc. is currently providing sustainability consulting services as part of ZAS
Architects and Bucholz McEvoy Architects integrated design team. As such, the consultant has
detailed knowledge of the project design, cost and criteria that will support the development of a
sustainability program that is based on an effective balance between the project's current budget,
schedule and sustainability goals.
594
Furthermore, Green Reason's involvement as a member of the integrated design team during the
design development, planning approvals and construction document stages will allow for a more
cost effective and seamless transition into the contract administration, certification and
commissioning phases of the project that will be required to achieve the project's sustainability
targets. Continuity between the design phase and the certification phases that will follow the
construction and commissioning phases are also expected to be benefited by Green Reason's
involvement in this additional scope of work.
Staff therefore recommends award of the contract on a preferred source basis as per Section
9.3.3 of TRCA's Purchasing Policy as follows:
The required goods and services are to be supplied by a vendor or supplier having
specialized knowledge, skills, expertise or experience that cannot be reasonably provided
by any other supplier.
FINANCIAL DETAILS
The final design and site plan approval process will be undertaken between October 2017 and
into early 2019, followed by construction and commissioning phases that will conclude in 2021.
Funds are available in the Capital Budget for the contract period of 2017 — 2021, in account
006-50.
Report prepared by: Jed Braithwaite, extension 5345
Emails: jed.braithwaiteo_trca.on.ca
For Information contact: Laura Stephenson, extension 5296
Emails: Istephenson(a)trca.on.ca
Date: November 27, 2017
595
RES.#6118/17 - LAB SERVICES
Contract #10006541 —Water Quality Samples for Tributary Monitoring
Program. Award of contract for analysis of water quality samples to monitor
tributary water quality for the binational 2018 Cooperative Science and
Monitoring Initiative.
Moved by: Chris Fonseca
Seconded by: Colleen Jordan
THAT Contract #10006541 to analyze water quality samples for tributary water quality
(from 2017 to 2020) be awarded on a preferred source basis to the York -Durham Regional
Environmental Laboratory a total cost not to exceed $123,893.81, plus HST;
AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA)
officials be directed to take the necessary action to implement the contract including
signing and execution of documents.
CARRIED
BACKGROUND
It can be generally stated that the Canadian and Amercian shores of Lake Ontario have elevated
nutrient concentrations in comparison to the oligotrophic offshore. Zebra and quagga mussels,
and lakebed algae, are present to varying degrees within the nearshore while the nutrient -poor
offshore is becoming less habitable for certain fish species and other biota. Significant resources
are being spent on the abatement of point and non -point nutrient loading to Lake Ontario to
mitigate nearshore eutrophication, however, it is difficult to assess whether abatement is effective
from a lake perspective due to a poor understanding of overall nutrient loading and the associated
loading impacts on the lake. It is impossible to predict how restoration or future development on
land will affect the lake in absence of a better understanding of how nutrients are leaving the land.
Understanding the delivery of nutrients, pollutants and other materials from watersheds to the
Great Lakes is therefore fundamental to understand lake response, and to manage environmental
quality, ecosystem health and lake health.
There is a broad need for tributary loading information associated with other program areas and
initiatives. Most notably, it is expected that focus of the Nutrient Annex of the Great Lakes Water
Quality Agreement and the task of setting nutrient loading and concentrations targets will shift to
Lake Ontario in the coming year. Multiple domestic program areas also need or will benefit from
the insights that an effective tributary monitoring program can deliver including source water
protection, the Great Lakes Protection Act, and management of the recurrent issues associated
with excessive algae and shoreline fouling. The primary driver of the timing of the proposed
tributary monitoring is to support the binational 2018 Lake Ontario Cooperative Science and
Monitoring Initiative (CSMI) and Canada -Ontario Agreement (COA), however, the motivator for
the work is broader and should be considered a starting point for increased emphasis and
possibly ongoing tributary nutrient and pollutant export monitoring across Lake Ontario.
Tributary monitoring will be completed binationally in 2018 and 2019 to estimate nutrient loadings
to Lake Ontario. In Canada, data will be generated from TRCA, and the provincial and federal
governments. These data will need to be combined for future analysis of loading calculations,
and hence will need to be directly comparable.
• •
RATIONALE
Since this effort is binational, it is crucial that the water quality data generated from the tributary
monitoring can be compared with provincial and federal government data and ideally with our
American counterparts. The York -Durham Regional Environmental Laboratory was historically
an Ontario Ministry of the Environment lab and hence has lab methods that are comparable to the
Province of Ontario. TRCA has conducted cross -lab comparisons between the York -Durham
Regional Environmental Lab and the Ministry of the Environment and Climate Change (MOECC)
for the Regional Watershed Monitoring Program and found the data to be comparable. In
addition, lab quality assurance/quality control through cross -lab comparisons between the
York -Durham Regional Environmental Lab and the federal government have shown in the past
that this lab generates analytical results that are comparable to the federal government. There
have also been extensive cross -lab comparisons between the provincial and federal governments
and the federal and the American researchers.
The request for lab services on a preferred source basis is in compliance with TRCA's purchasing
policy under Section 9.3 (3) which states:
The required goods and services are to be supplied by a particular vendor or supplier
having special knowledge, skills, expertise or experience that cannot be provided by any
other supplier.
FINANCIAL DETAILS
In the multi-year grant from the Ontario Ministry of the Environment and Climate Change (Account
code 225-95), $140,000 has been allotted for laboratory services at the York -Durham Regional
Environmental Lab.
DETAILS OF WORK TO BE DONE
In 2018 and 2019, water quality samples will be collected during storm- and base- flow events and
analyzed for Total, Dissolved, and Soluble Reactive Phosphorus, Nitrate plus Nitrite, Nitrite, Total
Kjeldhal Nitrogen, Ammonia plus Ammonium, Chloride, Sulphate, Total Suspended Solids, and
Conductivity.
Report prepared by: Krista Chomicki, extension 5857
Emails: kchomicki(abtrca.on.ca
For Information contact: Gary Bowen, 416-271-8944
Emails: gbowen(&trca.on.ca
Date: November 17, 2017
597
Section IV — Ontario Regulation 166/06, As Amended
RES.#6119/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Colleen Jordan
Seconded by: Vincent Crisanti
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.5 and 10.7 — 10.12 which are listed below.
PERMIT APPLICATIONS 10.1 - 10.5 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
10.1 16 NORDALE CRESCENT
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Lot 215, Plan A-01, (16 Nordale Crescent), in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed. The purpose is to
construct a pool, pool decking and retaining wall to the rear of the existing single family
dwelling at 16 Nordale Crescent in the City of Toronto (Etobicoke York Community
Council Area). The proposal also includes minor landscaping. A portion of the works
were constructed without TRCA or Municipal permits. As such, the applicant has paid
double the application fee as required for a permit "after -the -fact' in association with the
violation of Ontario Regulation 166/06.
CFN: 58649 - Application #: 1142/17/TOR
Report Prepared by: Anna Lim 5284 alim@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: November 13, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10.2 TORONTO TRANSIT COMMISSION
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on, (225 and 230 Milliken Boulevard (formerly 2080 McNicoll Avenue)), in
the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed
as located on the property owned by Toronto Transit Commission. The purpose is to
develop a slab -on -grade single storey bus garage facility approximately 28,000m3 at
2080 McNicoll Avenue, Scarborough. No in -water works associated with this project.
CFN: 58458 - Application #: 1155/17/TOR
Report Prepared by: Renee Afoom-Boateng 5714 rafoom-boateng@trca.on.ca
For information contact: Renee Afoom-Boateng 5714 rafoom-boateng@trca.on.ca
Date: December 6, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10.3 TORONTO ZOO
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Part Lot 1, 2, 3, 4, 5, 6, 7, 8, Plan 3, 4, (361A Old Finch Avenue), in the
City of Toronto (Scarborough Community Council Area), Rouge River Watershed as
located on the property owned by Toronto Zoo. The purpose is to construct a zipline, a
treetop walk, a challenge course, and an ecological educational center at the Toronto
Zoo.
CFN: 58309 - Application #: 0887/171TOR
Report Prepared by: Steve Heuchert 5311 sheuchert@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: December 4, 2017
CITY OF VAUGHAN
10.4 1352579 ONTARIO INC.
To construct, reconstruct, erect or place a building or structure on West Half Lot 30,
Concession 6, (4251 Kirby Road), in the City of Vaughan, Humber River Watershed as
located on the property owned by 1352579 Ontario Inc. The purpose is to recognize the
construction of a 177.5 sq. m. (1910.6 sq. ft.) ground floor and 290.2 sq. m. (3123.7 sq.
ft.) second floor addition to an existing single family dwelling as well as a 55.2 sq. m.
594.2 sq. ft.) deck located at the side/rear of the dwelling. The described additions to
the dwelling and replacement deck were constructed without TRCA or municipal permits.
As such, the applicant has paid double the application fee as required for voluntary
compliance related to resolution of a violation of Ontario Regulation 166/06.
CFN: 58927 - Application #: 1357/17NAUG
Report Prepared by: Stephen Bohan 5743 sbohan@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: December 4, 2017
599
TOWN OF CALEDON
10.5 255 KING STREET EAST
To construct, reconstruct, erect or place a building or structure on Part Lot 1, Plan 43R-
8908, 255 King Street East, in the Town of Caledon, Humber River Watershed. The
purpose is to recognize the construction of a 5.5 m by 6.8 m (18 ft by 22.3 ft) wood deck
located at the west side of an existing residential dwelling located within TRCA's
Regulated Area of the Humber River Watershed. The described works were initiated
without the issuance of a TRCA or municipal building permit. As such, an additional
permit application fee of 100% was charged for this "after -the -fact" permit.
CFN: 58660 - Application #: 1176/17/CAL
Report Prepared by: Andrea Terella 5657 andrea.terella@trca.on.ca
For information contact: Andrea Terella 5657 andrea.terella@trca.on.ca
Date: December 6, 2017
RES413120/17 - STANDARD DELEGATED PERMITS
Moved by: Colleen Jordan
Seconded by: Vincent Crisanti
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.6 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years or less.
CITY OF BRAMPTON
1803070 ONTARIO CORP. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 2,286 sq. m (24,610 sq. ft.)
commercial plaza ranging from one storey to two storey and a retaining wall associated with a
municipal site plan application (City File No. SP16-094.000), a municipal minor variance
application (City File No. A17-164) and a municipal building permit. The subject property is
located at 4781 Castlemore Road, in the City of Brampton.
CFN: 58623 - Application #: 1268/17/BRAM
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: November 6, 2017
•OI
GREEN VALLEY DEVELOPMENTS LTD. / MICHAEL CECI / DORA CECI - Humber River
Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate final grading operations and servicing within the Phase 2
subdivision lands associated with a municipal draft plan of subdivision application and zoning
by-law amendment application to allow a residential development within the Vales of Humber
Secondary Plan.
CFN: 58348 - Application #: 0923/17/13RAM
Report Prepared by: Adam Miller, extension 5244, email amiller@trca.on.ca
For information contact: Adam Miller, extension 5244, email amiller@trca.on.ca
Date: November 16, 2017
58 DAWNRIDGE TRAIL - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of 4.87 metre x 10.36 metre (15.9 feet x 33.9
feet) in -ground swimming pool and 3.05 metre x 3.05 metre (10 feet x 10 feet) pool shed at the
rear of an existing residential dwelling associated with a municipal building permit.
CFN: 58703 - Application #: 1178/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 6, 2017
REGIONAL MUNICIPALITY OF PEEL - Mimico Creek Watershed
The purpose is to undertake emergency work to temporarily cover and protect an exposed trunk
sewer located within a tributary of the Mimico Creek, located east of Airport Road and north of
Highway 407, in the City of Brampton. This permit was reviewed in accordance with the TRCA
Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15).
Due to the emergency nature of the work, no construction timing window will apply to this
project.
CFN: 58630 - Application #: 1281/17/13RAM
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: November 13, 2017
7435 MAYFIELD ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 450.58 sq. m (4,850 sq. ft.) replacement
single family dwelling and driveway associated with a municipal building permit application.
CFN: 58072 - Application #: 0703/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 10, 2017
601
490 MAIN STREET NORTH - Etobicoke Creek Watershed
The purpose is to is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a replacement septic system at the rear of an
existing residential dwelling associated with a municipal building permit.
CFN: 57710 - Application #: 0399/17/BRAM
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: October 30, 2017
CITY OF MARKHAM
38 CACHET PARKWAY - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 1,120 sq. m (12,056 sq. ft) replacement
dwelling and detached garage associated with a municipal building permit.
CFN: 58073 - Application #: 0709/17/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: November 2, 2017
30B ROUGE STREET - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of a new two-storey single detached dwelling with a total
GFA of 321.9 square metres with several ancillary structures (i.e. deck, pool and shed) on the
subject property.
CFN: 58843 - Application #: 1314/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: November 13, 2017
8 CACHET PARKWAY - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 566.10 sq.m (6,093.44 sq.ft) replacement
dwelling, septic system and rear porch associated with a municipal building permit.
CFN: 55725 - Application #: 0347/16/MARK
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: November 10, 2017
YMCA OF GREATER TORONTO - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge Rive[
Watershed in order to facilitate the expansion of a parking lot on the subject property.
602
CFN: 58779 - Application #: 1311/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: November 13, 2017
YORK CONDOMINIUM CORPORATION 100 - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to demolish/remove multiple structures (i.e. decks, patios, wooden retaining wall etc.) located at
the rear of the condominium townhouse block in order to regrade the area to facilitate the
construction of an emergency access walkway. In addition, the applicant is proposing to build
five replacement wooden staircases/patios approximately 4 square metres in size at the rear
entrances of the townhouses.
CFN: 58517 - Application #: 1078/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: November 24, 2017
YORK REGION DISTRICT SCHOOL BOARD - Rouge River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed to facilitate site grading, landscaping, and the construction of a paved driveway,
concrete walkways, asphalt parking and stormwater servicing (outfall, storm sewers, manhole
and catch basins), associated with a proposed two-storey public school.
CFN: 56626 - Application #: 1142/16/MARK
Report Prepared by: Jeffrey Thompson, extension 5386, email jthompson@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: October 30, 2017
CITY OF MISSISSAUGA
3525 BRANDON GATE DRIVE - Mimico Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek
Watershed in order to facilitate the reconstruction of fourteen (14) second storey wood decks
located at the rear of existing condominium townhouse units associated with a municipal
building permit.
CFN: 58587 - Application #: 1107/17/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 8, 2017
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to construct a new asphalt road, inbound and outbound truck weigh scales and a
leaf and yard waste storage bunker at the existing Fewster Community Recycling Centre. No in -
water works are proposed.
603
CFN: 58619 - Application #: 1257/17/MISS
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: November 3, 2017
3181 MERRITT AVENUE - Mimico Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek
Watershed in order to facilitate a unit located in the basement of an existing residential dwelling.
The subject property is located at 3181 Merritt Avenue, in the City of Mississauga.
CFN: 58874 - Application #: 1323/17/MISS
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: November 17, 2017
CITY OF PICKERING
MARSHALL HOMES (COPPERFIELD) LTD. - Petticoat Creek Watershed
The purpose is to construct a temporary sales trailer and grade a new gravel parking lot to the
rear at 1893 Altona Road in the City of Pickering.
CFN: 58873 - Application #: 1318/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 29, 2017
NORTH PICKERING COMMUNITY MANAGEMENT INC. - Duffins Creek Watershed
The purpose is to allow for stockpiling of approximately 55,000 cubic metres of surplus
excavated material from the adjacent subdivision lands for the future 3rd Concession Road
extension and overpass, as part of the servicing for the new Seaton community in the City of
Pickering. Stockpiling will occur from approximately the CP rail tracks, westerly for 0.42 km. A
permanent 900 mm diameter culvert will also be installed to convey drainage through the site
from an outfall at the adjacent subdivision. Work at this site is part of a multi -staged approach
involving stockpiling within the future 3rd Concession Road right-of-way to facilitate the new
road extension (CFN 56603), constructing a trunk sanitary sewer (previously approved, CFN
56655), and constructing the road extension (part of a separate future permit approval, CFN
54884). Works will take place within the City of Pickering, Duffins Creek Watershed, as located
on lands owned by Infrastructure Ontario.
CFN: 56603 - Application #: 1226/16/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
For information contact: Sharon Lingertat, extension 5717, email slingertat@trca.on.ca
Date: November 13, 2017
.IA
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
4208-4214 DUNDAS STREET WEST (VI) INC. - Humber River Watershed
The purpose is to construct a new 21 storey residential tower. The existing building and
appurtenances will be removed from the buffer area and the buffer area will be re -graded.
CFN: 58730 - Application #: 1224/17/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 10, 2017
59 BARTONVILLE AVENUE WEST - Humber River Watershed
The purpose is to construct a one storey addition including basement to the rear of the existing
two storey single family detached dwelling at 59 Bartonville Avenue West in the City of Toronto
(Etobicoke York). The existing one storey rear addition is to be demolished.
CFN: 49015 - Application #: 0223/131TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 29, 2017
23 KENNEDY PARK ROAD - Humber River Watershed
The purpose is to construct a replacement retaining wall in the rear yard of the existing dwelling
at 23 Kennedy Park Road in the City of Toronto (Etobicoke York). The existing retaining wall is
in a state of disrepair.
CFN: 57212 - Application #: 0128/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 16, 2017
22 BECKETT AVENUE - Humber River Watershed
The purpose is to construct a replacement detached garage to the rear of the existing single
family dwelling at 22 Beckett Avenue in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 58350 - Application #: 0931/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 10, 2017
32 GOLF VALLEY LANE - Etobicoke Creek Watershed
The purpose is to reconstruct the existing second storey at the two storey single family dwelling
at 32 Golf Valley Lane in the City of Toronto (Etobicoke York Community Council Area).
• l �
CFN: 58727 - Application #: 1223/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 8, 2017
22 SPEARS STREET - Humber River Watershed
The purpose is to construct a second storey addition above the existing bungalow and
cantilevered above a proposed rear patio at 22 Spears Street in the City of Toronto (Etobicoke
York).
CFN: 58675 - Application #: 1179/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 25, 2017
2567 LAKE SHORE BOULEVARD WEST - Waterfront Watershed
The purpose is to construct a replacement shoreline protection structure along the waterfront in
the rear yard of the existing single family detached dwelling at 2597 Lake Shore Boulevard West
in the City of Toronto (Etobicoke York). The existing shoreline protection structure is in a state of
disrepair.
CFN: 58663 - Application #: 1167/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 13, 2017
57 GREENBROOK DRIVE - Humber River Watershed
The purpose is to construct a two storey single family dwelling with integral garage at 57
Greenbrook Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 57431 - Application #: 0195/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 27, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
18 SHAMOKIN DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling where an existing one storey
single family detached dwelling is currently located at 18 Shamokin Drive in the City of Toronto
(North York Community Council Area).
CFN: 58665 - Application #: 1174/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 14, 2017
• We
12 WINTON ROAD - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage at 12 Winton
Road in the City of Toronto (North York Community Council Area).
CFN: 58011 - Application #: 0662/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alien@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
26 RYKERT CRESCENT - Don River Watershed
The purpose is to construct a new two-storey single family detached dwelling at 26 Rykert
Crescent in the City of Toronto (North York Community Council Area).
CFN: 57497 - Application #: 0278/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 3, 2017
25 YORK VALLEY CRESCENT - Don River Watershed
The purpose is to construct a main floor and second floor addition to the existing dwelling
located at 25 York Valley Crescent in Toronto (North York Community Council Area).
CFN: 57359 - Application #: 0144/17/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 3, 2017
120 GLENVIEW AVENUE - Don River Watershed
The purpose is to underpin the existing basement of the existing two and a half storey single
family detached dwelling located at 120 Glenview Avenue in the City of Toronto (North York
Community Council Area).
CFN: 58567 - Application #: 1117/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 8, 2017
52 FIFESHIRE ROAD - Don River Watershed
The purpose is to construct a two-storey replacement dwelling, with rear terrace, in -ground pool
and associated landscaping at 52 Fifeshire Road in the City of Toronto (North York Community
Council Area).
607
CFN: 47697 - Application #: 0525/12/TOR
Report Prepared by: Jessica Bester, extension 5250, email jbester@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 7, 2017
36 REVCOE DRIVE - Don River Watershed
The purpose is to construct a two storey single family dwelling with integral garage at 36
Revcoe Drive in the City of Toronto (North York Community Council Area)..
CFN: 56564 - Application #: 1061/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 25, 2017
THE ONTARIO ASSOCIATION OF ARCHITECTS - Don River Watershed
The purpose is to construct an underground geothermal system and HVAC piping at the Ontario
Association of Architects located at 111 Moatfield Drive in the City of Toronto (North York
Community Council Area).
CFN: 58604 - Application #: 1154/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 25, 2017
UJA FEDERATION OF GREATER TORONTO - REAL ESTATE GROUP - Don River
Watershed
The purpose is to construct an integrated private institutional complex that includes a
community centre, theatre, chapel, offices, private school, day-care, art gallery, artist studio,
museum, library, fitness centres, food services and swimming facilities, as well as significant
landscaping and connections to the Don River valley.
CFN: 58589 - Application #: 1105/17/TOR
Report Prepared by: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: September 18, 2017
15 YORK VALLEY CRESCENT - Don River Watershed
The purpose is to construct a two storey replacement dwelling, basement walkout, and rear yard
hardscaping at 15 York Valley Crescent in the City of Toronto (North York Community Council
Area).
CFN: 58513 - Application #: 1081/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 1, 2017
• I i
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
59 FALLINGBROOK ROAD - Waterfront Watershed
The purpose is to construct a two storey replacement dwelling and rear and front deck where an
existing one storey single family detached dwelling is currently located at 59 Fallingbrook Road
in the City of Toronto (Scarborough Community Council Area).
CFN: 58773 - Application #: 1274/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step h an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 14, 2017
281 WEST POINT AVENUE - Rouge River Watershed
The purpose is to construct an attached garage to the front of an existing one and a half storey
single family detached dwelling located at 281 West Point Avenue in the City of Toronto
(Scarborough Community Council Area).
CFN: 58661 - Application #: 1184/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
1343 WARDEN AVENUE - Don River Watershed
The purpose is to construct a second storey addition over the existing footprint and a two storey
addition to the rear, converting the existing dwelling into a legal two family dwelling at 1343
Warden Avenue in the City of Toronto (Scarborough Community Council Area).
CFN: 57891 - Application #: 0583/171TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step h an i e.worro n@trca. o n. ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 24, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
60 GLENWOOD CRESCENT - Don River Watershed
The purpose is to construct a two-storey addition to the front and third storey above the existing
two-storey single family detached dwelling at 60 Glenwood Crescent in the City of Toronto
(Toronto & East York).
CFN: 57225 - Application #: 0110/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
•1e
101 GLEN DAVIS CRESCENT - Waterfront Watershed
The purpose is to reconstruct the existing rear addition at the two storey single family dwelling at
101 Glen Davis Crescent in the City of Toronto (Toronto and East York Community Council
Area).
CFN: 58121 - Application #: 0725/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 8, 2017
CITY OF TORONTO - Waterfront Watershed
The purpose is to install a standby gas generator and precast shed with associated electrical
equipment at the City of Toronto's Fire Training Academy located at 895 Eastern Avenue, east
of Leslie Street, in Toronto. No in -water work is within the scope of this project.
CFN: 57666 - Application #: 0570/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 23, 2017
18 HEATHDALE ROAD - Don River Watershed
The purpose is to construct a one storey rear addition to the existing two storey single family
dwelling at 18 Heathdale Road in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 58601 - Application #: 1140/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
2 GLENSHAW CRESCENT - Don River Watershed
The purpose is to construct a new attached garage below a second storey addition and a two-
storey addition to the side and rear of the existing 1 1/2 storey single family detached dwelling at
2 Glenshaw Crescent in the City of Toronto (Toronto and East York).
CFN: 57194 - Application #: 0058/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
12 HEATHDALE ROAD - Don River Watershed
The purpose is to construct a one storey and two storey rear addition to the existing three storey
single family detached dwelling at 12 Heathdale Road in the City of Toronto (Toronto and East
York Community Council Area).
610
CFN: 57700 - Application #: 0397/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 13, 2017
CITY OF VAUGHAN
BAY HOMES INC. - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of two (221.2 sq. m. (2380.9 sq. ft.) and 219.9 sq. m. (2366.9 sq. ft.)) single
detached dwellings on lands known municipally as 22 and 26 Francesca Court, in the City of
Vaughan.
CFN: 58306 - Application #: 0893/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: November 21, 2017
BEST WAY STONE LIMITED - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a new septic system and the decommissioning of an existing septic system on
lands known municipally as 8821 Weston Road, in the City of Vaughan.
CFN: 58575 - Application #: 1113/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: November 23, 2017
BLOCK 11 DEVELOPERS GROUP - Don River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River watershed, the
cleaning and restoration of the Block 11, Stormwater Pond 9 as part of the assumption process
for the City of Vaughan.
CFN: 57922 - Application #: 0631/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 24, 2017
140 COLDSPRING ROAD - Humber River Watershed
The purpose is to undertake works in TRCA's Regulated Area of the Humber River Watershed
in order to construct a 2 -storey replacement dwelling with a basement, an in -ground pool and a
cabana on the subject property, associated with a municipal building permit.
CFN: 57196 - Application #: 0061/171VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: October 27, 2017
611
68 KIRKHILL PLACE - Humber River Watershed
The purpose is to undertake works within TRCA's regulated area of the Humber River
Watershed in order to facilitate the construction of an addition to the basement and first floor of
the existing dwelling, associated with a municipal building permit. The subject property is
municipally known as 68 Kirkhill Place in the City of Vaughan.
CFN: 58715 - Application #: 1201/171VAUG
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: October 26, 2017
TOWN OF CALEDON
14189 CENTREVILLE CREEK ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to implement a stream channel restoration project on the subject property.
The works also include wetland restoration/plantings as well as the decommissioning of a gravel
driveway. Furthermore, the works are to be completed by TRCA's Restoration Services Division.
CFN: 58777 - Application #: 1284/17/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: November 2, 2017
CANCIAN CONSTRUCTION LTD. - Humber River Watershed
The purpose is to construct a new three storey building within a TRCA Regulated Area within
the Bolton Special Policy Are.
CFN: 57989 - Application #: 0681/171CAL
Report Prepared by: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: June 12, 2017
8242 MAYFIELD ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order facilitate the construction of a 9 m x 6.1 m (29.5 ft. x 20 ft.) storage building
associated with a municipal building permit application. The subject property is located at 8242
Mayfield Road, in the Town of Caledon.
CFN: 58761 - Application #: 1303/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: November 24, 2017
612
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 495.3 sq. m (5,331 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 57984 - Application #: 1185/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: December 4, 2017
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 575.6 sq. m (6,196 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58650 - Application #: 1143/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: October 24, 2017
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 507.8 sq. m (5,466 sq. ft.) residential
dwelling and septic system associated with a municipal building permit.
CFN: 58655 - Application #: 1146/171CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: October 24, 2017
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 578.40 sq. m (6,225.68 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58679 - Application #: 1195/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: November 14, 2017
613
229 RIDGE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 254.2 sq.m. (2639.31 sq. ft.) 1.5 storey
dwelling with attached garage on a vacant lot of record associated with a Municipal Minor
Variance application (Town File: A039-17) and Municipal building permit.
CFN: 58657 - Application #: 1161/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 8, 2017
M.J.J.J. DEVELOPMENTS INCORPORATED - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the enclosure of the existing storm drainage feature and the
installation of the storm sewer pipe to divert the flows located 7 Loring Drive, in the Town of
Caledon.
CFN: 57180 - Application #: 0039/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: November 14, 2017
14586 MT. PLEASANT ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 245.9 sq. m. (2647.06 sq. ft.) two storey
replacement dwelling and install septic bed associated with municipal Site Plan Application
(Town File: 17-0040) and building permit application.
CFN: 58506 - Application #: 1045/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 8, 2017
TOWN OF CALEDON - Humber River Watershed
The purpose is to reconstruct 250 m of Finnerty Sideroad from approximately 100 m west of
The Gore Road, in the Town of Ajax. The cold water construction timing window will be applied
to this project.
CFN: 56326 - Application #: 0780/16/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: November 13, 2016
614
TOWN OF RICHMOND HILL
18 CASTLERIDGE DRIVE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 6.7 m. by 2.1 m. (22 ft. by 7 ft.) addition located at the
rear of an existing dwelling associated with a municipal building permit.
CFN: 58600 - Application #: 1141/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: November 2, 2017
MATTAMY HOMES (ELGIN MILLS) LIMITED - Rouge River Watershed
The purpose is to undertake internal servicing works in support of the approved draft plan of
subdivision.
CFN: 58769 - Application #: 1269/17/RH
Report Prepared by: Doris Cheng, extension 5306, email dcheng@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: October 26, 2017
REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed
The purpose is to undertake road reconstruction to eliminate an intersection jog at Leslie Street
and 19th Avenue, and to widen Leslie Street and 19th Avenue to four lanes at the new
intersection.
CFN: 57963 - Application #: 0737/171RH
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: November 9, 2017
TOWN OF RICHMOND HILL - Rouge River Watershed
The purpose is to undertake the cleanout works of the stormwater management facility (19-1)
located at Cassata Avenue, northwest of Major Mackenzie Drive East and Frank Endean Road.
The warm water construction timing window will apply to this project.
CFN: 57957 - Application #: 0739/17/RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 19, 2017
TOWN OF RICHMOND HILL - Rouge River Watershed
The purpose is to undertake the cleanout works of the stormwater management facility (19-2)
located on 1390 Major Mackenzie Drive East. The warm water construction timing window will
apply to this project.
615
CFN: 57958 - Application #: 0738/17/RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 19, 2017
TOWN OF RICHMOND HILL - Rouge River Watershed
The purpose is to undertake the cleanout works of the stormwater management facility (19-5)
located on 109-123 Toporowski Avenue. The warm water construction timing window will apply
to this project..
CFN: 57967 - Application #: 0754/171RH
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: October 19, 2017
YORK REGION RAPID TRANSIT CORPORATION - Don River Watershed
The purpose is to undertake widening of Yonge Street within the regulated area between
Highway 7 and Garden Avenue. The works will include removal and reconstruction of the
roadway, installation of a oil grit separator (OGS) unit that will discharge into the storm sewer
and site grading. The works are required to accommodate VivaNext Bus Rapid Transit (BRT)
project.
CFN: 57451 - Application #: 0288/171RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: November 21, 2017
TOWNSHIP OF KING
36 CHARLES STREET - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 89 sq. m. (960 sq. ft.) garage and dwelling expansion on lands known
municipally as 36 Charles Street, in the Township of King.
CFN: 58922 - Application #: 1350/171KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: November 24, 2017
115 LYNWOOD CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's regulated area of the Humber River
Watershed in order to facilitate the construction of a replacement two-storey dwelling with a
basement on the subject property. The property is municipally known as 115 Lynwood Crescent
in the Township of King.
616
CFN: 58333 - Application #: 0928/17/KING
Report Prepared by: Polina Bam, extension 5256, email polina.bam@trca.on.ca
For information contact: June Little, extension 5756, email jlittle@trca.on.ca
Date: October 25, 2017
2 BLUEBERRY LANE - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 962 sq. m. (10,354 sq. ft.) replacement dwelling on lands known municipally
as 2 Blueberry Lane, in the Township of King.
CFN: 58735 - Application #: 1232/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: November 3, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on West Drive and at 33 West Drive, located north of Orenda Road, in the City of Brampton,
Etobicoke Creek Watershed as located on the property owned by a private landowner to whom
Enbridge Gas Distribution Inc. is providing service, and on property owned by the City of
Brampton under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to
install a NPS 1 ST HP gas main in order to service a development that was previously approved
under a separate application. No in -water work is associated with this project.
CFN: 58446 - Application #: 1118/17/BRAM
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 26, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing road
allowance on The Gore Road, south of Castlemore Road, and on property located at 9990 The
Gore Road, in the City of Brampton, Humber River Watershed as located on property owned by
a private landowner to whom Enbridge Gas Distribution Inc. is providing service, and on
property owned by the Region of Peel under Franchise Agreement with Enbridge Gas
Distribution Inc. The purpose is to install NPS 1 1/4 SC HP gas service in order to service a
new commercial development, which was previously approved by TRCA under Permit No. C-
150782. No in -water work is associated with this project.
617
CFN: 58621 - Application #: 1309/171BRAM
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: November 27, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain, utility installation or maintenance within an existing roadway on
Kennedy Road North, south of Mayfield Road, in the City of Brampton, Etobicoke Creek
Watershed as located on property owned by the City of Brampton. The purpose is to install a
100 mm diameter conduit for Rogers Communications Canada Inc. along Kennedy Road North,
from Mayfield Road southwards for a length of 150 m, in the City of Brampton. No in -water
works are associated with this project.
CFN: 58695 - Application #: 1169/17/BRAM
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: November 27, 2017
CITY OF MARKHAM
ALECTRA UTILITIES CORPORATION
To undertake utility pole installation on Warden Avenue from 16th Avenue to Major Mackenzie
Drive, in the City of Markham, Rouge River Watershed as located on the property owned by
Regional Municipality of York. The purpose is to undertake replacement of existing poles and
guying on Warden Avenue from 16th Avenue to Major Mackenzie Drive. The pole line is being
rebuilt to allow for the addition of two new circuits. The new poles will be installed using the Vac -
System technique with backfill. The Ministry of Natural Resources and Forestry (MNRF)
Redside Dace fisheries timing window will apply to this proposal unless otherwise specified in
writing by MNRF.
CFN: 58451 - Application #: 1103/17/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: November 3, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing road
allowance on Finch Avenue near Milvan Drive, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed as located on the property owned by the
City of Toronto under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is
to install a NPS 4 PE IP pipeline crossing above a watercourse. The warmwater construction
timing window will apply to this project.
CFN: 57834 - Application #: 0576/17/TOR
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 26, 2017
ROGERS COMMUNICATIONS CANADA INC
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Bloor Street West and Indian Road, in the City of Toronto (Etobicoke York Community
Council Area), Waterfront Watershed as located on the property owned by the City of Toronto.
The purpose is to install conduit and grade level boxes. No in -water work is within the scope of
this project.
CFN: 57295 - Application #: 1291/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 5, 2017
TELUS COMMUNICATIONS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Little Avenue, a portion of Lawrence Avenue West, near Black Creek Drive, and a portion of
Weston Road, east of Cross Street, in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on property owned by the City of Toronto. The
purpose is to install conduit and handwells. The warm water construction timing window of July
1 st to March 31 st will be applied to this project.
CFN: 57683 - Application #: 1026/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 29, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction at 1132 Leslie Street, in the City of
Toronto (North York Community Council Area), Don River Watershed as located on property
owned by the City of Toronto. The purpose is to undertake re -paving of an existing access
driveway and parking lot in Sunnybrook Park. The warm water construction window of July 1 to
March 31 will apply to this project.
CFN: 57170 - Application #: 1104/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 22, 2017
619
TELUS COMMUNICATIONS INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Wilmington Avenue and Finch Avenue West, in the City of Toronto (North York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to install conduit and handwells. No in -water work is within the scope
of this project.
CFN: 57282 - Application #: 1137/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 5, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at the intersection of Ellesmere Road and Birchmount Road, in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed as located on property owned by the City
of Toronto. The purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 57281 - Application #: 1138/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 26, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Morningview Trail, east of Morningside Avenue, in the City of Toronto (Scarborough
Community Council Area), Rouge River Watershed as located on property owned by the City of
Toronto. The purpose is to install conduit and grade level boxes. No in -water work is within the
scope of the project.
CFN: 57283 - Application #: 1238/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 22, 2017
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on , (side of 1 Skyridge Road an across Military Trail), in the City of Toronto
(Scarborough Community Council Area), Highland Creek Watershed as located on the property
owned by City of Toronto. The purpose is to install conduit and grade level boxes. No in -water
work is within the scope of this project.
CFN: 57286 - Application #: 1241/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 22, 2017
620
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on East Avenue, north of Maberley Court, in the City of Toronto (Scarborough Community
Council Area), Waterfront Watershed as located on property owned by the City of Toronto. The
purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 57287 - Application #: 1244/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 22, 2017
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Rolark Drive, Ellesmere Road and Birchmount Road, in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed as located on property owned by the City
of Toronto. The purpose is to install conduit and a grade level box. No in -water work is within
the scope of this project.
CFN: 57345 - Application #: 0338/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: October 26, 2017
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Pharmacy Avenue and Alrita Crescent, northeast of Victoria Park Avenue and Ellesmere
Road, in the City of Toronto (Scarborough Community Council Area), Don River Watershed as
located on property owned by the City of Toronto. The purpose is to install conduit and a vault.
No in -water work is within the scope of this project.
CFN: 58253 - Application #: 0856/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 10, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Eastern Avenue from Marigold
Avenue to Knox Avenue, near Leslie Street, in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to undertake road resurfacing on Eastern Avenue from Knox Avenue
to Marigold Avenue in Toronto. No in -water work is within the scope of this project.
CFN: 57292 - Application #: 1237/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: November 22, 2017
621
CITY OF VAUGHAN
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 9570 Highway 27, between Major Mackenzie Drive and Rutherford Road, in the City of
Vaughan, Humber River Watershed as located on the property owned by the Regional
Municipality of York, with access granted through municipal consent. The purpose is to remove
an existing utility pole at 9570 Highway 27, between Major Mackenzie Drive West and
Rutherford Road in the City of Vaughan on property owned by the Regional Municipality of York.
The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window will apply
to these works unless otherwise specified in writing by the MNRF.
CFN: 58163 - Application #: 0972/17NAUG
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
Date: November 3, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 7895 Jane Street, in the City of Vaughan, Humber River Watershed as located on the
property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing
service and on property owned by the City of Vaughan under a franchise agreement with
Enbridge Gas Distribution Inc. The purpose is to install NPS 2 ST YJ HP gas service in order to
service a new development. No in -water work is associated with this project.
CFN: 58609 - Application #: 1245/17/VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 26, 2017
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation within an existing roadway along Rossland
Road and a new street tentatively named "Street A", located near Bunting Court in the Town of
Ajax, Duffins Creek Watershed as located on the property currently owned by the developer.
The property will eventually be assumed by the Town of Ajax, and will be under Franchise
Agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas
pipeline in order to service a new residential development, which was approved by TRCA under
a separate permit (Permit No. C-160182). No in -water work is associated with the project.
CFN: 58614 - Application #: 1258/17/AJAX
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: December 5, 2017
622
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along the north side of Rossland Road, and along Seagrave Lane located immediately north of
Riverside Drive, in the Town of Ajax, Duffins Creek Watershed, as located on property owned
by the Town of Ajax, under Franchise Agreement with Enbridge Gas Distribution Inc., and on
property owned by a private landowner from whom Enbridge Gas Distribution Inc. is in the
process of obtaining an easement. The purpose is to install a NPS 2 PE IP gas header service
to service a future residential development, which was previously approved by TRCA under
Permit No. C-170365. No in -water work is associated with this project.
CFN: 58622 - Application #: 1293/17/AJAX
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: December 5, 2017
TOWN OF CALEDON
TOWN OF CALEDON
To undertake structure maintenance at 15924 Innis Lake Road, in the Town of Caledon,
Humber River Watershed as located on property owned by the Town of Caledon. The purpose
is to construct a new illuminated sign, located at 15924 Innis Lake Road on the south corner of
the Ontario Provincial Police (OPP) access road, in the Town of Caledon. No in -water works are
associated with this project.
CFN: 58696 - Application #: 1262/17/CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: November 10, 2017
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the
east side of Yonge Street, from Industrial Road to Bernard Avenue, in the Town of Richmond
Hill, Don River Watershed as located on the property owned by the Town of Richmond Hill
under a franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a
NPS 8 ST DFBE HP gas pipeline crossing a watercourse. No in -water work is associated with
this project.
CFN: 58443 - Application #: 1077/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 26, 2017
623
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Yonge Street, Elgin Mills Road, at 10737 Yonge Street, in the Town of Richmond Hill, Don
River Watershed as located on the property owned by the Town of Richmond Hill under a
franchise agreement with Enbridge Gas Distribution Inc. and on property owned by a private
landowner to whom Enbridge Gas Distribution Inc. is providing service. The purpose is to install
a NPS 1 1/4 PE IP gas header service. No in -water work is associated with this project.
CFN: 58612 - Application #: 1247/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: October 26, 2017
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on the east side of Yonge Street, between Levendale Road and north of Industrial
Road, in the Town of Richmond Hill, Don River Watershed as located on the property owned by
the Town of Richmond Hill under a franchise agreement with Enbridge Gas Distribution Inc.
The purpose is to install NPS 12 ST DFBE IP gas mains. No in -water work is associated with
this project.
CFN: 58613 - Application #: 1256/17/RH
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: November 9, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
38 MAVERICK CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , 38 Maverick
Crescent, in the City of Brampton, Humber River Watershed.
CFN: 57982 - Application #: 1164/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: October 27, 2017
624
6 PORTLANE COURT
To install a swimming pool on Lot 55, Plan 43M-1975, 6 Portlane Court, in the City of Brampton,
Humber River Watershed.
CFN: 57979 - Application #: 1165/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: October 27, 2017
2 ROCKSTEP COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and change the
use, size, or number of dwelling units of a structure, or undertake work that does not change the
footprint of the existing structure on Lot 357, 358, 359, 360, 361, 362, 363, Plan 43M-1566, 2
Rockstep Court, in the City of Brampton, Humber River Watershed.
CFN: 58746 - Application #: 1219/17/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: October 27, 2017
CITY OF MARKHAM
43 CASTLEVIEW CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 36, Plan
65M-3644, (43 Castleview Crescent), in the City of Markham, Rouge River Watershed.
CFN: 58935 - Application #: 1375/17/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: November 30, 2017
CITY OF PICKERING
1998 TREETOP WAY
To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part 1 Lot 10, Plan 40M-1810,
(1998 Treetop Way), in the City of Pickering, Petticoat Creek Watershed.
CFN: 58848 - Application #: 1316/17/PICK
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 14, 2017
625
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
44 NORDALE CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground
floor addition up to 50 sq. m (538 sq. ft), construct a ground floor addition or structure greater
than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the use, size, or
number of dwelling units of a structure, or undertake work that does not change the footprint of
the existing structure on Lot 15, Plan 3704, (44 Nordale Crescent), in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed.
CFN: 58933 - Application #: 1347/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 24, 2017
10 VISTA HUMBER RIVER
To construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 26, Plan M-1632, (10
Vista Humber Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber
River Watershed.
CFN: 58846 - Application #: 1340/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 22, 2017
240 ST. MARKS ROAD
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a
ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling
units of a structure, or undertake work that does not change the footprint of the existing
structure on Lot 59, Plan 4655, (240 St. Marks Road), in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed.
CFN: 58752 - Application #: 1253/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 13, 2017
76 WEST DEANE PARK DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and change the
use, size, or number of dwelling units of a structure, or undertake work that does not change the
footprint of the existing structure on Lot 138, Plan 5719, (76 West Deane Park Drive), in the City
of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.
CFN: 58860 - Application #: 1343/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 22, 2017
626
10 MEADOWCREST ROAD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on , (18 Meadowcrest Road), in the City of
Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.
CFN: 58662 - Application #: 1182/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 27, 2017
17 NORBERT CRESCENT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 21, Plan 7736, (17 Norbert Crescent), in
the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 58744 - Application #: 1270/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 8, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
61 YATESBURY ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (61 Yatesbury
Road), in the City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 58742 - Application #: 1266/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 9, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
185 BETHANY LEIGH DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 25, Plan M2024, (185 Bethany Leigh
Drive), in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed.
CFN: 57983 - Application #: 1187/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: October 24, 2017
627
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
21 COPELAND AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground
floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft)
and change the use, size, or number of dwelling units of a structure, or undertake work that
does not change the footprint of the existing structure on Lot 120, Plan E - 461, (21 Copeland
Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed.
CFN: 58932 - Application #: 1348/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: November 24, 2017
CITY OF VAUGHAN
1 HAVENBROOK COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (1 Havenbrook
Court), in the City of Vaughan, Don River Watershed.
CFN: 58568 - Application #: 1109/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 27, 2017
161 TWIN HILLS CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 15, Plan 65M-4111, (161
Twin Hills Crescent), in the City of Vaughan, Humber River Watershed.
CFN: 58704 - Application #: 1192/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: November 10, 2017
TOWN OF AJAX
92 ROBERSON DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 188, Plan
40M-1793, (92 Roberson Drive), in the Town of Ajax, Duffins Creek Watershed.
CFN: 58734 - Application #: 1231/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: October 30, 2017
98 SHARPLIN DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, Plan
40M-2487, (98 Sharplin Drive), in the Town of Ajax, Carruthers Creek Watershed.
CFN: 58937 - Application #: 1376/17/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 5, 2017
TOWN OF CALEDON
91 SACKVILLE STREET
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, 33, 34,
Block 4, Plan BOL -7, Part 1 Plan 43R-9835, 91 Sackville Street, in the Town of Caledon,
Humber River Watershed.
CFN: 58759 - Application #: 1283/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 13, 2017
13905 KENNEDY ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 3, Plan 43M-
1897, 13905 Kennedy Road, in the Town of Caledon, Humber River Watershed.
CFN: 58737 - Application #: 1235/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 7, 2017
24 FILTON ROAD
To install a swimming pool on Lot 12, Plan 43M-1481, 24 Filton Road, in the Town of Caledon,
Humber River Watershed.
CFN: 58676 - Application #: 1177/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: November 7, 2017
TOWN OF RICHMOND HILL
441 PARADELLE DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 82, Plan
65M-3727, (441 Paradelle Drive), in the Town of Richmond Hill, Humber River Watershed.
629
CFN: 58774 - Application #: 1275/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: November 15, 2017
TOWNSHIP OF KING
35 HOGAN COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on , (35 Hogan
Court), in the Township of King, Humber River Watershed.
CFN: 58741 - Application #: 1248/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: October 25, 2017
PERMIT APPLICATIONS 10.7 —10.12 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF MARKHAM
10.7 29 GLENBOURNE PARK DRIVE
To construct, reconstruct, erect or place a building or structure on , (29 Glenbourne Park
Drive), in the City of Markham, Rouge River Watershed. The purpose is to undertake
works within the Rouge River Watershed to facilitate the restoration of an area disturbed
by unauthorized site alteration and grading works within a TRCA Regulated Area. The
proposed works will resolve the outstanding TRCA violation (No. V3044) on the subject
property. In addition, the works also includes the construction of a deck (approximately
270 square feet in size) at the rear of the existing dwelling.
CFN: 58664 - Application #: 1175/17/MARK
Report Prepared by: Aidan Pereira 5723 apereira@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: December 11, 2017
630
CITY OF VAUGHAN
10.8 75 VALLEY ROAD
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Part Lot 2, Plan 3755, (75 Valley Road), in the City of Vaughan,
Humber River Watershed. The purpose is to facilitate, within TRCA's Regulated Area of
the Humber River Watershed, the continued development of a partially completed
541.86 sq. m. (5,832 sq. ft.) 2 storey dwelling and new septic system on lands known
municipally as 75 Valley Road, in the City of Vaughan. The described works were
started without TRCA or municipal permits. As such, the Owner has paid double the
application fee as required for voluntary compliance related to resolution of a violation of
Ontario Regulation 166/06.
CFN: 58666 - Application #: 1173/17/VAUG
Report Prepared by: Anthony Syhlonyk 5272 asyhlonyk@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: December 8, 2017
CITY OF VAUGHAN
10.9 NASHVILLE (NORTH) DEVELOPMENTS INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Part Lot 24, Concession
9, (10533 Huntington Road), in the City of Vaughan, Humber River Watershed as
located on the property owned by Nashville (North) Developments Inc. The purpose is to
allow development and the alteration of a watercourse within a Regulated Area of the
Humber River Watershed to facilitate topsoil stripping and the installation of sediment
and erosion control measures in Phase 1 of a draft approved plan of subdivision (19T -
16V010) also known as the Mizuno lands within Block 61 West, northeast of Major
Mackenzie Drive and Huntington Road, in the City of Vaughan.
CFN: 58592 - Application #: 1124/17NAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: December 12, 2017
TOWN OF CALEDON
10.10 CASTLES OF CALEDON CORPORATION
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on Part Lot 4, Concession 6, (89 Walker Road West), in the Town of
Caledon, Humber River Watershed as located on the property owned by Castles of
Caledon Corporation. The purpose is to grade, place fill and construct interim servicing
within a Regulated Area of the Humber River watershed to facilitate the development of
a new residential subdivision.
631
CFN: 55989 - Application #: 0571/16/CAL
Report Prepared by: Leilani Lee -Yates 5370 Ilee-yates@trca.on.ca
For information contact: Leilani Lee -Yates 5370 [lee-yates@trca.on.ca
Date: December 12, 2017
TOWN OF RICHMOND HILL
10.11 MATTAMY (ELGIN MILLS) LIMITED
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28,
Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills)
Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge
River Watershed to facilitate the grading and servicing of a municipally approved draft
plan of subdivision. These works include the installation of revised sediment and
erosion control measures, the construction of an outfall and permanent stormwater
management pond (Pond D1) which outlets to a pocket wetland and infiltration swale,
prior to discharging to the natural heritage system and Tributary 2-2 within the North
Leslie Secondary Plan Area.
CFN: 56719 - Application M 1027/161RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Doris Cheng 5306 dcheng@trca.on.ca
Date: December 12, 2017
TOWN OF RICHMOND HILL
10.12 MATTAMY (ELGIN MILLS) LIMITED
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Part Lot 27, 28,
Concession 2, (Leslie Street and Elgin Mills Road East), in the Town of Richmond Hill,
Rouge River Watershed as located on the property owned by Mattamy (Elgin Mills)
Limited. The purpose is to undertake works within a TRCA Regulated Area of the Rouge
River Watershed to facilitate the grading and servicing of a municipally approved draft
plan of subdivision. These works include the installation of revised sediment and
erosion control measures, the construction of an outfall and permanent stormwater
management pond (Pond D2) which outlets to a pocket wetland and infiltration swale,
prior to discharging to the natural heritage system and Tributary 2-1 within the North
Leslie Secondary Plan Area.
CFN: 56720 - Application #: 1028/16/RH
Report Prepared by: Doris Cheng 5306 dcheng@trca.on.ca
For information contact: Quentin Hanchard 5324 ghanchard@trca.on.ca
Date: December 12, 2017
632
NEW BUSINESS
RES413121/17 - EAST HUMBER HEADWATERS PARK
Moved by: Glenn De Baeremaeker
Seconded by: Jack Ballinger
WHEREAS Toronto and Region Conservation Authority (TRCA) has long supported the
preservation and expansion of natural heritage areas and the objectives of the Greenbelt
and the Oak Ridges Moraine Conservation Plan (ORMCP);
AND WHEREAS one of the most critical Natural Linkage areas in the ORMCP consists of
lands in King running north -south from the 15th Sideroad to King road, between Dufferin
Street on the west and Bathurst Street on the east, including significant tributaries and
headwaters of the East Humber River;
AND WHEREAS these lands currently have no areas of public parkland and public
access but present numerous opportunities for restoration and celebration of the natural
heritage of the Humber River;
AND WHEREAS the owner of a large portion of these lands, constituting approximately
208 hectares at 770,780, 798, 988 King Road, 13516 Bathurst Street and Part of 13415
Dufferin Street, Township of King, has approached TRCA staff and municipal and
provincial officials claiming they have partially transitioned development rights under the
Oak Ridges Moraine Conservation Act and Planning Act which would allow for resort -
type accommodation and a golf course that would permanently eliminate the ability to
bring these lands into public ownership and restore them to a natural state;
AND WHEREAS the property owner has proposed a land exchange of the majority of
these lands for developable lands held by the Province of Ontario which are already
designated and planned for development;
AND WHEREAS the Province of Ontario has previously worked with TRCA to secure and
protect large land areas in the GTA for natural heritage preservation and restoration
(including the nearby Bathurst Glen lands on the Oak Ridges Moraine);
AND WHEREAS the Township of King Council will be considering a motion to request
completion of the land exchange with the potential of lands to be transferred to TRCA to
establish an East Humber Headwaters Park;
THEREFORE LET IT BE RESOLVED THAT TRCA staff be directed to:
1. Enter into discussions with municipalities, the Province of Ontario, the Region of
York and the Township of King about the best way to ensure the long-term
preservation and restoration of the King lands and establishment of the East
Humber Headwaters Park; and,
2. Report back on issues and opportunities present with receiving and/or managing
these lands if the Province supports the proposal for a land exchange and
development of a park on these lands.
633
TERMINATION
ON MOTION, the meeting terminated at 10:47 a.m., on Friday, December 15, 2017.
Maria Augimeri
Chair
/ks
634
John MacKenzie
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #11/17 was held at TRCA Head Office, on Friday, January
12, 2018. The Chair Maria Augimeri, called the meeting to order at 9:33 a.m.
PRESENT
Maria Augimeri
Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Brenda Hogg
Member
Mike Mattos
Member
Jennifer McKelvie
Member
PRESENT VIA TELECONFERENCE
Chris Fonseca Member
Jennifer Innis Member
Colleen Jordan Member
ABSENT
Jack Heath Vice Chair
Glenn De Baeremaeker Member
Anthony Perruzza Member
RES.#B122/17 -
Moved by:
Seconded by:
MINUTES
Jennifer McKelvie
Mike Mattos
THAT the Minutes of Meeting #10/17, held on December 15, 2017, be approved.
CARRIED
635
Section I — Items for Authority Action
RES.#6123/17 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Duff ins Creek Watershed
Logan Homes (333568 Ontario Limited), CFN 58961. Acquisition of
property located west of Ninth Line and north of Bloomington Road, in the
Town of Whichurch-Stouffville, Regional Municipality of York, under the
"Greenlands Acquisition Project for 2016-2020," Flood Plain and
Conservation Component, Duff ins Creek watershed.
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.21 hectares (3 acres), more or less,
of vacant land, located west of Ninth Line and north of Bloomington Road, said land being
Part of Lot 11, Concession 9, designated Block 33 on draft M -Plan by Lloyd & Purcell Ltd.
OLS, Job 15-078, File W1 -IX -11-1, in the Town of Whichurch-Stouffville, Regional
Municipality of York, be purchased from Logan Homes (333568 Ontario Limited);
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land
free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date. All reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with Ms. Laura Powell, Law Clerk, Cattanach Hindson Sutton
VanVeldhuizen, Barristers and Solicitors, acting as agent for the owner.
Access to the subject lands will be achieved through its frontage on Ninth Line
Attached is a sketch illustrating the location of the subject lands.
RATIONALE
The subject lands fall within TRCA's approved master plan for acquisition for the Duffins Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through
the review of the Plan of Subdivision 19T-86.075 and 19T(W)-97.004, TRCA staff established the
limits of the open space land. The subject lands also contain a portion of the Stouffville Creek.
636
TAXES AND MAINTENANCE
This parcel of land will be turned over to the Town of Which urch-StouffviIle under the terms of the
existing management agreement.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewongCa)trca.on.ca
For Information contact: Edlyn Wong, extension 5711, Mike Ferning, extension 5223
Emails: ewongCcDtrca.on.ca, mfenning(a)trca.on.ca
Date: December 5, 2017
Attachments: 1
637
Attachment 1
Subject
Property
Duffin,
m B�
Legend
Clrontoand Region SITE
onservation YORK DURHAM
for The Living City
PEEL
LJ TORONTO
i.xe antano
638
RES.#6124/17 - VOLUNTARY PROJECT REVIEW
Works Undertaken by Organizations Exempt from Ontario Regulation
166/06, As Amended. Summary report on the Voluntary Project Review of
works undertaken by organizations exempt from Ontario Regulation
166/06, as amended — Regulation of Development, Interference with
Wetlands and Alteration to Shorelines and Watercourses, through
Voluntary Project Review letters issued during 2017.
Moved by: Jennifer McKelvie
Seconded by: Mke Mattos
THAT Toronto and Region Conservation Authority (TRCA) staff continue to work with
crown corporations undertaking environmental assessments for infrastructure projects
who are exempt from permits under Section 28 of the Conservation Authorities Act to
ensure that the five tests of Ontario Regulation 166/06, as amended, control of flooding,
erosion, pollution, conservation of land and dynamic beaches, are addressed during the
detailed design stage of these projects in 2018.
CARRIED
BACKGROUND
In 2014, the TRCA fee schedule provided an option for crown corporations including provincial
and federal agencies, railways, and radio communication and broadcasting antenna system
providers to apply for Voluntary Project Review (VPR). These organizations are exempt from the
Conservation Authorities Act Section 28 regulatory approval process and permits are not
required. In the absence of the formal permitting process, TRCA has developed a process
whereby the party may voluntarily request TRCA to review and comment on detailed design
activities to confirm that TRCA policies and procedures are being addressed. Once TRCA
concerns are satisfied, a Voluntary Project Review Letter is provided by TRCA staff at the design
stage confirming TRCA objectives and requirements have been satisfied as set out in The Living
City Policies and Ontario Regulation 166/06, as amended.
TRCA has worked with multiple user groups in the environmental assessment and detailed
design review of various projects. To date, Metrolinx has made a commitment to ensure that
TRCA review of project details at the Environmental Assessment, pre -design and VPR stages are
completed in a streamlined and expeditious manner. TRCA has worked with Metrolinx in the
review of multiple projects related to both Metrolinx GO and Lightrail Transit (RT) projects and
issued 11 VPR letters. In addition to Metrolinx GO and light rail transit (LRT), TRCA also issued
VPR letters to 407 ETR Concession Company Ltd., Hydro One and Infrastructure Ontario (10)
through 2017.
TRCA staff reviewed the projects listed below and ensured that mitigation measures included in
the design and construction plans address policy and technical concerns related to flood and
erosion controls and protection, protection and restoration of natural heritage features, and
erosion and sediment controls. The majority of projects reviewed were related to Metrolinx GO
and Metrolinx Rapid Transit projects, as supported by service level agreements between TRCA
and Metrolinx. Metrolinks has ensured that the public-private consortiums commissioned to
undertake the detailed design of these projects are required to obtain the TRCA VPR letter prior to
construction. As such, in 2018, TRCA will continue to review design details for Metrolinx's
Lakeshore, Barrie and Stouffville GO track and station expansions, SmartTrack stations, as well
as the Eglinton and Finch LRTs. Staff continues to advocate the Voluntary Project Review
process to other crown corporations, including both the Ministry of Transportation (and their
public-private consortiums) and Rouge Park.
639
Details are provided below:
CFN 56534 — Crosslinx Transit Solutions - Tree/vegetation Removals and Relocation
of Wet and Dry Utilities in Advance of the Eglinton Crosstown Light Rail Transit
(ECLRT) — issued on February 9, 2017, and revised on June 12, 2017
The purpose was to undertake the removal of trees and relocation of wet and dry utilities on
Eglinton Avenue West, from just east of Black Creek to just east of Keelesdale Drive, in the City of
Toronto. The proposed works involved tree/vegetation clearance and relocation of vital
infrastructure (watermain, storm sewer, sanitary sewer and hydro) in advance of the construction
of the Elevated Guideway and West Portal. The works were proposed to be undertaken to enable
and facilitate future construction works on the Elevated Guideway and West Portal. The site is
located on the property owned by the City of Toronto for the Eglinton Crosstown LRT project and
located in the Humber River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(&trca.on.ca
CFN 53460 — Metrolinx GO - Replacement of the Don River Bridge Span, Richmond
Hill Corridor Bala Mile 8.8 — issued on February 21, 2017
The purpose of the project was to replace the timber spans on the existing bridge that spans over
the Don River at Mile 8.8 of the Richmond Hill GO Corridor, located east of the Don Valley
Parkway between Lawrence Avenue East and Eglinton Avenue East, in the City of Toronto. The
proposed works were undertaken to support the construction of future double tracking of the rail
corridor. Works included replacing timber spans, construction of new piers, abutments, caps and
walls to enhance the existing support system for the existing bridge. The site is located on the
property owned by Metrolinx and located in the Don River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(&trca.on.ca
CFN 56894 — 407 ETR - OPP Detachment Building — 8308 Bathurst Street — issued on
February 24, 2017
The purpose of the project was to construct an Ontario Provincial Police (OPP) Detachment
Office on lands located at 8308 Bathurst Street, in the City of Vaughan. The proposed works
involved the construction of an office space with a gross floor area of 1,170.5 m2 with 78 parking
spaces and one loading space. The site is located on the property owned by 407 ETR and in the
Don River watershed.
For Information contact: Scott Smith, extension 5758; ssmith(aD-trca.on.ca
4. CFN — 56177 — Crosslinx Transit Solutions - Site Grading, Drainage and Wet Utilities,
and Maintenance and Storage Facility Located at 3500 Eglinton Avenue West for
ECLRT — issued on March 9, 2017
The purpose of the project was to undertake site grading, drainage and construction of wet utilities
including sanitary and storm sewer lines and Stormwater Management Pond #2, construction of
OPSCO building, parking lot and installation of LRT tracks at the Eglinton Maintenance and
Storage Facility (EMSF) site, located at 3500 Eglinton Avenue West, in the City of Toronto. Works
on site included: site grading, drainage, installation of sanitary and storm sewers, construction of
stormwater management ponds (SWM) ponds 1 and 2, construction of a gravel service road to
SWM Pond 2, construction of associated building structures, installation of LRT tracks, access
roads and paved parking lots. The site is located on the property owned by the City of Toronto and
Metrolinx for the Eglinton Crosstown LRT project and in the Humber River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzganiCciltrca.on.ca
5. CFN 57040 — Crosslinx Transit Solutions - Relocation of Wet Utilities and
Construction of Box Tunnel and U -wall for ECLRT — issued on March 17, 2017
The purpose of the project was to undertake the relocation of wet utilities and construction of a
box tunnel and U -Wall located at the existing Launch Shaft No. 3 (LS -3), on Eglinton Avenue
East, east of Brentcliffe Road and immediately west of the West Don River Bridge, in the City of
Toronto, in order to facilitate and enable the construction of the LRT tracks for the future ECLRT.
Works included the relocation of wet utilities and construction of a box tunnel and U -Wall. The site
is located on the property owned by the City of Toronto for the ECLRT project and in the Don
River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(&trca.on.ca
6. CFN 56466 — Crosslinx Transit Solutions - Relocation of Dry Utilities including
Rogers, Bell, Cogeco Telecommunication and Toronto Hydro Electric System Limited
(THESL) for ECLRT — issued on May 11, 2017
The purpose of the project was to undertake relocation of dry utilities on Eglinton Avenue East,
between Birchmount Road and lonview Road, in the City of Toronto. The works are proposed to
be undertaken in order to prepare the site in advance of construction of the ECLRT on Eglinton
Avenue East. Works include: i) relocation of Cogeco fiber optic cables from existing overhead
telecommunications line to underground duct bank; ii) relocation of Rogers fiber optic cables from
existing overhead telecommunications line to underground duct bank; iii) relocation/shifting of Bell
line in the existing underground duct bank to accommodate Rogers and Cogeco fibe optic cables;
and, iv) relocation of Toronto Hydro poles and overhead lines from the north side of Eglinton
Avenue East to the south side of the road and construction of underground duct banks to
accommodate hydro lines at various locations. The site is located on the property owned by the
City of Toronto for the Eglinton Crosstown LRT project and in the Don River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzganina.trca.on.ca
7. CFN 54070 — Metrolinx GO - Don Yard Upgrade and Expansion — issued May 16, 2017
The purpose of the project was to undertake upgrades to a train storage facility known as the Don
Yard, located approximately three kilometres east of Union Station, north of the Gardiner
Expressway and adjacent to the Don River, in the City of Toronto. The proposed project is being
undertaken to upgrade and expand the existing Don Yard in order to accommodate additional GO
Transit and UP Express train, which will be operating out of the yard upon completion of the Union
Station Rail Corridor Expansion project. Proposed works include the construction of three train
storage tracks with wayside, a light servicing shed, a nose servicing platform, a compressed air
system, a sand storage system, two retaining walls and environmental protection infrastructure.
The site is located on property owned by Metrolinx and in the Don River watershed.
For Information contact: Renee Afoom-Boateng, ext. 5714; rafoom-boateng(a)trca.on.ca
641
CFN 57937 — Crosslinx Transit Solutions - Grading and Fill Placement on the South
Side of Eglinton Avenue East and just West of Ontario Science Centre for ECLRT —
issued June 12, 2017
The purpose of the project was to undertake grading and placement of fill in connection to the
construction of a temporary toe wall on the south side of Eglinton Avenue East, just west of
Ontario Science Centre, in the City of Toronto. The proposed works were undertaken to widen the
roadway in advance of construction of the ECLRT to re-route traffic temporarily. The site is
located on the property owned by the City of Toronto for the ECLRT project and in the Don River
watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(a)trca.on.ca
CFN 55804 — Crosslinx Transit Solutions - Elevated Guideway, West Portal and
Widening of Eglinton Avenue West in Connection with the ECLRT — issued on July 18,
2017
The purpose of the project was to undertake the construction of the elevated guideway, West
Portal and widening of Eglinton Avenue West, between Mount Dennis Station and Bicknell
Avenue/Municipal Drive intersection, in the City of Toronto. The proposed works involved the
construction of the structure of the elevated guideway and its associated structures, widening of
the bridge over Black Creek and realignment of Eglinton Avenue West for the ECLRT on Eglinton
Avenue West. Works include: i) decommissioning of the outfall on the north side of Eglinton
Avenue West; ii) construction of the elevated guideway; iii) construction of the west portal; iv)
realignment of Eglinton Avenue West and wet utilities; v) widening of Black Creek Bridge, and, vi)
installation of Power Ductbanks.. The site is located on the property owned by the City of Toronto
for the ECLRT project and in the Humber River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(cDtrca.on.ca
10. CFN 57552 — Metrolinx GO -Embankment Stabilization at Oakville 5.94 —issued July
20, 2017
The purpose of the project was to repair the failing railway embankment to address safety
concerns of transit users and Metrolinx staff at Oakville Mi. 5.94, south of Gardiner Expressway
and west of Park Lawn Road, in the City of Toronto. The proposed works involved: i) the
construction of a temporary access road; ii) the installation of precast concrete L -walls; iii) the
construction of cast -in-place extension of the lower section of the existing concrete retaining wall
to match the higher section of the existing concrete retaining wall; iv) re-establishment and
stabilization of the failed slope, and, v) removal of failed gabion baskets and installation of a large
stone buttress east of the failed gabion baskets. The site is located on the property owned by
Metrolinx GO Transit and TRCA and in the Mimico Creek watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(&trca.on.ca
642
11. CFN 56330— Hydro One Networks Inc. -Construction of H -Poles on the North and
South Sides of Eglinton Avenue East in advance of ECLRT — issued August 24, 2017
The purpose of the project was to undertake the construction of two H -Pole structures on the
north and south sides of Eglinton Avenue East, between Jonesville Crescent and Bermondsey
Road/Sloane Avenue intersection, in the City of Toronto. The proposed works involved installing
two H -Poles to raise the existing transmission line to create a clearance over Eglinton Avenue
East to accommodate the construction of the ECLRT project. The site is located on the property
owned by Hydro One Networks Inc. and in the Don River watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(cDtrca.on.ca
12. CFN 51992 — Infrastructure Ontario —Ontario Place Urban Park and Waterfront Trail —
issued September 8, 2017
The purpose of the project was to undertake grading and landscaping activities as well as
shoreline repairs at Ontario Place, south of Remembrance Drive at Newfoundland Road, in the
City of Toronto. The site is located on the property owned by Ontario Place Corporation and in the
Lake Ontario Waterfront.
For Information contact: Daniel Brent, extension 5774; dbrent(a)trca.on.ca
13. CFN 57222 — Crosslinx Transit Solutions - Relocation of Wet Utilities and Temporary
Road Widening of Eglinton Avenue East, Between Birchmount Road and Kennedy
Road in Advance of ECLRT — issued November 3, 2017
The purpose of the project was to undertake the relocation of wet utilities and road widening in the
area to support a temporary detour between Birchmount Road and Kennedy Road, in the City of
Toronto. Proposed construction works involve: i) relocation and replacement of an existing 300
mm diameter sanitary sewer between Rosemount Drive and lonview Road; ii) abandonment of an
existing storm sewer and construction of a box culvert storm sewer between Rosemount Drive
and Kennedy Road; iii) installation of three sanitary manholes and one storm sewer manhole; iv)
removals including concrete (sidewalks, curbs) and asphalt, and, v) road widening of Eglinton
Avenue East between Rosemount Drive and Kennedy Road to create a road detour. The site is
located on the property owned by the City of Toronto for the ECLRT project and in the Don River
watershed.
For Information contact: Shirin Varzgani, extension 5785; svarzgani(dtrca.on.ca
FINANCIAL DETAILS
Fees are paid for the review of all VPR projects in accordance with either the current TRCA
Administrative Fee Schedule for Environmental Assessment and Infrastructure Permitting
Services or based on service level agreements with Metrolinx GO Transit and Metrolinx RT
DETAILS OF WORK TO BE DONE
1. Staff will continue to advocate the importance and benefits of receiving TRCA permits at
the detailed design stage to other organizations exempt from Conservation Authorities Act
Section 28 regulatory approval process.
643
2. Staff will provide a summary report on issued VPR letters to the Executive Committee on
an annual basis.
Report prepared by: Shirin Varzgani, extension 5785
Email: svarzgani(a)trca.on.ca
For Information contact: Beth Williston, extension 5217
Email: bwilliston(a)trca.on.ca
Date: December 7, 2017
Mii
Section II — Items for Executive Action
RES16725/17 - FOOD SERVICE AND PUBLIC EVENTS AT BLACK CREEK PIONEER
VILLAGE AND KORTRIGHT CENTRE FOR CONSERVATION
Update on Contract #10004550. Report on continuing negotiation with the
preferred proponent and request to allow the agreement to be executed,
subject to terms and conditions satisfactory to TRCA staff and solicitor,
regarding the parameters of key terms and conditions.
Moved by: Chris Fonseca
Seconded by: Colleen Jordan
THAT the Chief Executive Officer and Chair of the Authority be authorized to award
Contract #10004550 for Food Service and Public Events at Black Creek Pioneer Village
and Kortright Centre for Conservation, subject to terms and conditions satisfactory to
Toronto and Region Conservation Authority (TRCA) staff and solicitor;
THAT authorized TRCA officials be directed to take such action as is necessary to
complete negotiations with the preferred proponent in line with the parameters outlined
in the staff report;
AND FURTHER THAT staff report back as required after award of the contract.
CARRIED
BACKGROUND
At Authority Meeting #9/17, held on November 17, 2017, Resolution #A214/17 was approved, in
part, as follows:
WHEREAS Toronto and Region Conservation Authority (TRCA) staff undertook a
Request for Proposal process which explored how new business partnerships may
contribute to growing and diversifying Black Creek Pioneer Village's (BCPV) and
Kortright Centre for Conservation's (KCC) food operations, events and retail services;
AND WHEREAS byPeterandPauls.com is the highest ranked proposal for
RFP#10004550 Food Services and Events for both BCPV and KCC;
AND WHEREAS it is beneficial to TRCA to continue managing all aspects of retail
services at BCPV and KCC;
THEREFORE LET /T BE RESOLVED THAT TRCA staff enter into contract negotiations
with byPeterandPauls. com for Contract #10004550 Food Services and Events at both
BCPV and KCC;
THAT TRCA's Executive Committee be delegated authority to award Contract
#10004550 Food Services and Events subject to terms and conditions satisfactory to
TRCA staff and solicitor,-...
O
RATIONALE
Due to time constraints associated with preparing for the upcoming wedding season, there is
urgency in completing negotiations early in 2018 for both parties. Subsequent to the November
Authority approval, staff commenced constructive negotiations with byPeterandPauls.com and
the terms and conditions are currently in the process of being drafted by TRCA's solicitor. TRCA
and the proponent have agreed upon four key parameters for the proposed contract to be
mutually beneficial:
1) Impact on Programming
Both parties recognize the importance of TRCA programming initiatives at BCPV and KCC and
the proponent is enthusiastic to work with TRCA staff to enhance these offerings and create
mutually beneficial services, whenever possible. In order to avoid scheduling conflicts, the
proponent will utilize TRCA's scheduling procedures and TRCA staff will be responsible for
ensuring all known events/programs are up-to-date in the system. The proponent commits to:
a) providing cost recovery pricing for internal TRCA events, so that it does not become cost
prohibitive to offer food for internal meetings/events on its own properties; and
b) providing low cost, healthy food offerings for students/families.
2) Revenue Generating Activities
In addition to an average guaranteed minimum annual operating lease in excess of $500,000
over 10 years for the management of food service and events, the proponent commits to:
a) adding an option for all byPeterandPauls.com wedding/event clients to make a donation
to The Living City Foundation, in support of TRCA initiatives;
b) raising additional fees for TRCA through charging heritage/conservation fees for
weddings and events and possibly charging for parking at both sites; and
c) holding two fundraisers a year, in conjunction with TRCA, with the primary goal of raising
money to fund improvements at these two sites. This entails producing fundraising
events and reviewing various outlets to raise funds, in return for recovery of hard costs
3) Proponent Exclusivity
In order to maintain control over the quality of food services, the proponent is asking for
exclusivity for all food produced at both sites. TRCA recognizes that this exclusivity is vital for
the proponent to protect the integrity of their brand. In situations where public programs require
food on a specific budget, TRCA staff will work with the proponent, as they will have the right of
first refusal. The contract will allow for specific exemptions, including heritage food items
produced on site and specific food products that the proponent is unable to produce.
4) Capital Costs
Both parties recognize that capital costs may exceed the $950,000 quoted in the proponent's
RFP response. As the partnership evolves, a more detailed assessment of required capital
projects will be determined.
Staff is requesting delegation of authority by the Executive Committee to TRCA's Chair and
Chief Executive Officer to satisfy the Authority recommendation while allowing for timely
approval, subject to terms and conditions satisfactory to TRCA staff and solicitor.
For Information contact: Michael Tolensky, extension 5965
Email: mtolensky(cDtrca.on.ca
Date: December 22, 2017
• e
RES.#B126/17 - FLOOD RISK ASSESSMENT AND RANKING PROJECT
Contract #10006654. Award of Contract #10006654 for the consulting
services required to complete the Flood Risk Assessment and Ranking
project.
Moved by: Chris Fonseca
Seconded by: Colleen Jordan
THAT Contract #10006654 for the consulting services required to complete the Flood Risk
Assessment and Ranking project be awarded to IBI Group at total cost not to exceed
$128,847, plus HST, IBI Group being the highest ranked proponent meeting Toronto and
Region Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of
$10,000 in excess of the contract cost as a contingency allowance if deemed necessary;
AND FURTHER THAT authorized TRCA officials be directed to take such actions as is
necessary to implement the contract including the signing and execution of documents.
CARRIED
BACKGROUND
TRCA maintains a database of Flood Vulnerable Areas (FVAs) which are defined as those
structures and road segments within the Regulatory floodplain. Most, though not all, of the FVAs
in the floodplain are located in the 43 FVA Clusters. These clusters correspond to historical
development within the floodplain, or known flood damage centres, and are defined as areas with
a high concentration of structures within the regulatory floodplain. With funding from the National
Disaster Mitigation Program, TRCA has been updating the FVA database, and undertaking an
updated Flood Risk Assessment Project. This overarching project has worked to convert the FVA
database into a geospatial format and quantify flood damages, with the ultimate goal of compiling
an updated risk assessment to analyze and rank flood risk within TRCA's jurisdiction, extending
the work of the Remedial Capital Works and Flood Protection Strategy.
The information produced by this project will provide improved estimation of functional and
regulatory flood risk at a granular level, which is important for risk mitigation and remediation
planning, and for emergency and disaster response planning. Previous assessments of flood
damages relied on Ministry of Natural Resources and Forestry depth -damage curves that stem
from studies undertaken in Fort McMurray over 30 years ago. Since then, new damage estimation
methodologies have emerged, most notably the damages curves developed for the Alberta
Provincial Flood Damage Assessment Study in 2014.
Having updated the FVA database inventory and generated FVA Cluster inundation mapping for
all storms leveraging internal GIS capabilities and two-dimensional modelling, the next step in risk
assessment involves 'rolling -up' these damage costs to inform risk rankings for the 43 FVA
Clusters. This includes determining risk factors beyond the tangible structure and content
damages. As this task involves advanced flood risk assessment analysis, consulting services are
required to complete the Flood Risk Assessment and Ranking process. The end -product will
include updated risk rankings for each cluster, a summary report describing the overall
methodology and risk assessment process, as well as plain -language summary reports for each
of the FVA Clusters, which together with GIS visualizations will prove valuable risk
communications tools. Furthermore, the overall project will provide valuable data for further
analysis to allow remediation and mitigation efforts to be focused where maximal benefits will be
realized, by providing the baseline for damage avoidance estimates that can quantify the benefits
for cost -benefit analysis of mitigation projects.
647
The project will take approximately nine months to complete, with an anticipated completion date
of September, 2018.
RATIONALE
The science and art of Flood Risk Assessment remains a niche discipline in Canada, and the
Request for Proposal (RFP) was sent to firms with appropriate expertise. IBI and Ebbwater
Consulting have flood risk assessment experience in Canada, AECOM can leverage corporate
resources across the globe, and Matrix Solutions is known for innovative solutions using GIS.
Accordingly, Request for Proposal #10006654 was sent to the following consulting firms on
November 22, 2017:
IBI Group;
Ebbwater Consulting;
AECOM; and
Matrix Solutions.
Of the four firms, two submitted technical and financial proposals via mail. AECOM and Matrix
solutions did not submit proposals, citing current workload and the timeline for which this project
needs to be completed. These were collected and opened by TRCA staff on December 11, 2017
with the following fee results:
Consulting Firms Fees
Plus HST
IBI Group $128,847
Ebbwater Consulting $230,300
Members of the selection committee, consisting of Engineering Services staff (Nick Lorrain,
Sameer Dhalla, Rehana Rajabali and Ying Qiao), reviewed proposals based on a weighted
scoring system consisting of the following:
Evaluation Criteria
Weighting
Conformance with the terms of the RFP
5%
Experience and Qualifications
30%
Understanding of scope of work
20%
Expertise and availability of project team
15%
Facilities of the consultant used to
perform the work
10%
Cost
20%
The averaged results from the staff evaluation of the proposals are as follows:
lConsulting Firms I Rankin out of 100%
IBI Group 83
Ebbwater Consulting 66
As reflected in the consultant scores, it was unanimously concluded based on the evaluation of
the proposals that 1131 Group presented both the best technical and fee proposal.
IBI Group are the authors of the National Guideline on Flood Vulnerability Functions, and the
developers of the most recent flood damage estimation methodology currently in use in Canada
through the 2014 Provincial Flood Damage Assessment study developed for the Government of
Alberta. Accordingly, IBI Group has extensive knowledge of flood risk assessment, with their staff
also having experience in the history of flood damage estimation through work with conservation
authorities during the time of the Federal Disaster Reduction Program. Their proposal is in
conformance with the methodology that TRCA has been undertaking in the overall FVA database
project thus -far, which itself uses approaches that were pioneered by IBI.
IBI Group has completed a number of flood risk assessment projects for municipalities in Canada
and continues to provide thought leadership and expertise in this emerging industry. The fee
schedule provided in IBI's proposal was deemed reasonable. Staff is confident that IBI Group will
provide TRCA with the desired product within the specified schedule and budget. Staff therefore
recommends that Contract #10006654 be awarded to IBI Group for the base cost of $128,847,
plus HST, as they are able to provide the valuable technical experience required and have a clear
understanding of the scope of work as defined in the RFP.
FINANCIAL DETAILS
Funds required to complete this project have been provided by the National Disaster Mitigation
Program, City of Toronto, and the regional municipalities of Peel, York and Durham. A maximum
upset limit of $128,847 plus contingency, plus HST has been set for this project available in
project account 107-09.
Report prepared by: Rehana Rajabali, extension 5220
Emails: rralabali(a)trca.on.ca
For Information contact: Rehana Rajabali, extension 5220; Sameer Dhalla, extension 5350
Emails: rraiabali(a)trca.on.ca; sdhalla(a)trca.on.ca
Date: December 20, 2017
M •
RES.#B127/17 - ALBION HILLS CONSERVATION AREA PROJECT
Sewage System Improvement Project — Sleepy Hollow Comfort Station
and Adjacent Trailer Dumping Station #2. Award of Contract #10006451 for
supply of all labour, equipment and materials necessary for septic system
improvements for two septic systems at Albion Hills Conservation Area, in
the Town of Caledon.
Moved by: Chris Fonseca
Seconded by: Colleen Jordan
THAT Contract #10006451 for supply of all labour, equipment and materials necessary for
septic system improvements for two septic systems at Albion Hills Conservation Area, in
the Town of Caledon be awarded to Berkim Construction Inc. at a total cost not to exceed
$184,926.00, plus HST, as they are the lowest bidder that best meets Toronto and Region
Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 10%
of the contract cost as a contingency allowance if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractors that submitted tenders, beginning with the next lowest bidder meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA staff be directed to take any action necessary to
implement the contract including obtaining any required approvals and the signing and
execution of documents.
CARRIED
BACKGROUND
In order to be compliant with the Environmental Protection Act, Albion Hills Conservation Area
(AHCA) underwent an Environmental Compliance Approval (ECA) process for all sewage
systems located at AHCA in 2015. The ECA issued by the Ministry of the Environment and
Climate Change (MOECC) included several specific conditions that TRCA must comply with
within defined timelines. In part, the conditions specified that TRCA shall submit an application for
an Amended ECA for approval of necessary upgrades to two existing sewage systems; Sleepy
Hollow comfort station and adjacent Trailer Dumping Station #2, for compliance with current
design standards, and shall include a proposed construction time schedule for the MOECC's
approval.
The existing Sleepy Hollow sewage system is rated at a maximum capacity of 16,500 L/day and
services comfort stations and showers for 60 existing campsites. The septic tank is a
two-compartment precast concrete tank with a capacity of approximately 9,000L, collecting
wastewater from the comfort station and discharging effluent by gravity flow to an existing
subsurface leaching bed.
The existing Trailer Dumping Station #2 located at Sleepy Hollow Campground consists of a one
compartment concrete underground vented tank having a total capacity of approximately 4,550 L.
The existing systems are over 35 years old and are not fitted with the necessary audible alarms,
proper venting, watertight risers and effluent filters that are required by current code. Due to the
age of the systems, the leaching beds will also need to be replaced and reconstructed as per
MOECC specifications.
650
In 2017, TRCA retained Calder Engineering to submit an amendment to ECA No. 2851-98NJ9J
based on the aforementioned MOECC request. Based on the investigation by Calder Engineering
and requirements for ECA approval, the two aforementioned septic systems at Sleepy Hollow
Campground were determined to require upgrades in order to be compliant with current MOECC
standards and regulations and to remain serviceable.
RATIONALE
Tender #10006451 was publicly advertised on the electronic procurement website Biddingo
(www.biddingo.com) on October 24, 2017 with a site information meeting held on October 30,
2017. Tender packages were sent to the following five contractors:
Berkim Construction Inc.;
CSL Group Itd.;
Esposito Bros Construction;
Reg -Con Inc.; and
Tascan Corporation.
The Procurement Opening Committee opened the Tenders on Thursday, November 16, 2017
with the following results:
BIDDERS TOTAL TENDER AMOUNT
Plus HST
Berkim Construction Inc. $184,926.00
Reg -Con Inc. $198,150.00
Tascan Construction $241,205.00
Restoration Services staff reviewed the bid received from Berkim Construction Inc. against its
own cost estimate and has determined that the bid is of reasonable value and also meets the
requirements as outlined in the contract documents. Further assessment by TRCA staff of Berkim
Construction Inc.'s' experience and ability to undertake similar projects was conducted through
reference checks, which resulted in positive feedback that Berkim Construction Inc. is capable of
undertaking the scope of work.
Based on the bids received, staff recommend that Berkim Construction Inc. be awarded Contract
#10006451 for supply of all labour, equipment and materials necessary for septic system
improvements for two septic systems at Albion Hills Conservation Area, in the Town of Caledon
for a total amount not to exceed $184,926.00, plus a 10% contingency, plus HST, it being the
lowest bid that meets TRCA specifications.
FINANCIAL DETAILS
Funds are available through the Region of Peel, within TRCA's Asset Management
Implementation budget account code 006-62.
Report prepared by: Michelle Guy, extension 5905
Emails: mguv(&trca.on.ca
For Information contact: Aaron D'Souza, extension 5775
Emails: aidsouza(&trca.on.ca
Date: December 8, 2017
651
Section III — Items for the Information of the Board
RES.#6128/17 - BLACK CREEK PIONEER VILLAGE
Mechanical System Replacement. Award of Contract #10006369 for
supply of all labour, equipment and materials necessary to replace the
existing mechanical system at Black Creek Pioneer Village Visitor's
Centre, in the City of Toronto.
Moved by: Jack Ballinger
Seconded by: Brenda Hogg
THAT the staff report regarding the award of tender for goods and services in support of
replacing the existing mechanical system at Black Creek Pioneer Village (BCPV) be
received.
CARRIED
BACKGROUND
Black Creek Pioneer Village Visitors Centre's heating, ventilation and air conditioning
system has passed its functional life. Existing mechanical systems are failing and in need of
immediate replacement.
At Authority Meeting #4/17, held on May 19, 2017, Resolution #A84/17 was approved as follows:
THAT a preferred source contract for professional consulting services associated with the
design, tender and construction of a replacement heating, ventilation and air conditioning
system (HVAC) at the Black Creek Pioneer Village Visitor Centre be awarded to Integral
Group for a total cost not to exceed $175,000, plus HST;
Working with the engineering firm Integral Group, TRCA staff prepared plans to replace the
existing failing heat pumps, cooling tower and boiler system with a centralized high efficiency air
system. These plans also include renovation of the ventilation system that provides fresh air into
the building and a building automation system to provide greater control over the HVAC system.
These works have been designed to allow the existing HVAC system to remain in place until it is
switched over to the new system to minimize disruption to BCPV operations during the
replacement period.
At Authority Meeting #8/17, held on October 27, 2017 Resolution #A179/17 was approved, in part,
as follows:
...THAT the Chief Executive Officer and Chair of the Authority be authorized to award the
construction contract for the replacement of the HVAC system at Black Creek Pioneer
Village, City of Toronto, if staff is unable to report to the Executive Committee or Authority
as per Toronto and Region Conservation Authority's (TRCA) Purchasing Policy due to
timing constraints;
THAT authorized TRCA officials be directed to take such actions as is necessary to
implement these contracts including the signing and execution of documents;
AND FURTHER THAT staff report back to the next Executive Committee or Authority as
required after award of contracts.
652
RATIONALE
The deadline for substantial completion of this project is March 31, 2018, as this date is
associated with the FedDev Ontario, Canada 150 Community Infrastructure Program funds.
Therefore, in fall 2017, staff initiated a Request for Pre -Qualification (RFPQ) statements for
mechanical and electrical contractors for construction services. The RFPQ was publicly
advertised on the electronic procurement website Biddingo (www.biddin-go.com) on September
15, 2017. Mechanical and electrical contractors interested in pre -qualifying were advised that the
criteria for evaluation would include meeting a series of mandatory and non -mandatory
requirements as shown below:
Mandatory Requirements
2016 Contractor's Qualification Statement (CCDC 11);
Bonding Verification;
Insurance Verification;
Sub -Contractors Indication;
Health and Safety Policy Document;
WSIB Clearance;
A letter detailing all liens and/or litigations that the contractor has been involved in over the
past five years;
A letter from the contractor's financial institution regarding the general financial position;
A letter stating whether the contractor's firm is union or non-union;
A signed Pre -Qualification Form.
Non -Mandatory Requirements
Project Specific Experience;
Key Personnel; and
Construction Management Experience.
On October 4, 2017, TRCA received pre -qualification submissions from the following 15 general
contractors:
Mechanical
AC Mechanical Contractors Ltd.;
Ambient Mechanical Ltd.;
ANVI Services ltd.;
Barlas Construction Inc.;
Litek Mechanical Services Inc.;
MSB Mechanical Ltd.;
Nor Line Plumbing and Mechanical Ltd.;
Nortek Mechanical Services;
PipeAl;
Sprint Mechanical Inc.; and
Swift Mechanical Services Inc.
Electrical
Buxton and Dawe Limited;
CEC Services Limited;
Modern Niagara Group Inc.; and
RA Graham Electrical Contractors.
653
Following receipt of the submissions, pre -qualifying documents were reviewed by the selection
committee made up of TRCA staff. Evaluations were based on the criteria defined above. Based
on the evaluation process, Tender documents for construction services were made available on
October 26, 2017 to the following nine pre -qualified general contractors:
Mechanical
AC Mechanical Contractors Ltd.;
Ambient Mechanical Ltd.;
Litek Mechanical Services Inc.;
MSB Mechanical Ltd.;
Nor Line Plumbing and Mechanical Ltd.;
Nortek Mechanical Services;
PipeAl;
Sprint Mechanical Inc.; and
Swift Mechanical Services Inc.
Electrical
Buxton and Dawe Limited;
CEC Services Limited;
Modern Niagara Group Inc.; and
RA Graham Electrical Contractors.
A mandatory bidders meeting/site tour was held on November 3, 2017. Tenders closed on
November 22, 2017 and the Procurement Opening Committee opened the tenders with the
following results:
BIDDERS
TOTAL TENDER AMOUNT
Plus HST
Nor -Line Plumbing and Mechanical
$1,978,756.00'
AC Mechanical
$2,241,200.00'
MSB Mechanical Inc.
$2,385,700.00 "
Sprint Mechanical Inc.
$2.490,000.00
Swift Mechanical
$2,905,700.00 "
Bids received from Nor -Line Plumbing and Mechanical, AC Mechanical, MSB Mechanical Inc.
and Swift Mechanical failed to comply with the mandatory bid requirements as stipulated in the bid
documents. There were financial implications associated with these non-compliant bids and they
were rejected without further consideration.
TRCA staff reviewed the bid received from Sprint Mechanical Inc. against its own cost estimate
and has determined that the bid is of reasonable value and also meets the requirements as
outlined in the contract documents. Further assessment by TRCA staff of Sprint Mechanical Inc.'s
ability to undertake similar projects was conducted through reference checks, which resulted in
positive feedback that Sprint Mechanical Inc. is capable of undertaking the scope of work.
654
DETAILS OF WORK TO BE DONE
Contract #10006369 was awarded to Sprint Mechanical Inc. on December 21, 2017. Since award,
TRCA has finalized an Agreement with Sprint Mechanical Inc. and mobilization took place on
Monday January 8, 2018. Additionally the contractor has initiated equipment orders and
submitted shop drawings for review and approval for material items with long lead times to
mitigate project delays.
FINANCIAL DETAILS
Partial funds are available from the CIP 150/ FedDev Ontario Funding Ask ($400,000), and
matched by TRCA reserves. The City of Toronto has included the HVAC repair funding in 2019
and is to be approved in February 2018 with TRCA's reserves covering the cash outlay until
receipt of this funding. Additionally, an application was put through the City of Toronto to the
Ontario Municipal Challenge Fund for $660,000 which, if successful, will be awarded in February
2018.
Report prepared by: Michelle Guy, extension 5905
Emails: mquv(&trca.on.ca
For Information contact: Aaron J. D'Souza, extension 5775
Emails: aidsouza(aDtrca.on.ca
Date: December 6, 2017
655
Section IV — Ontario Regulation 166/06, As Amended
RES.#6129/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Mike Mattos
Seconded by: Jennifer McKelvie
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.2 which are listed below.
CARRIED
RES.#13130/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses.
Moved by: Jack Ballinger
Seconded by: Brenda Hogg
THAT a permit be granted in accordance with Ontario Regulation 166/06, as amended, for
application 10.4 which is listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.2 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
656
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
10.1 ISLINGTON GOLF CLUB
To construct, reconstruct, erect or place a building or structure, change a building or
structure so that it alters its use or potential use, increases its size or increases the
number of dwelling units, site grade, temporarily or permanently place, dump or remove
any material, originating on the site or elsewhere, interfere with a wetland and alter a
watercourse on , (45 Riverbank Drive), in the City of Toronto (Etobicoke York
Community Council Area), Mimico Creek Watershed as located on the property owned
by Islington Golf Club. The purpose is to implement Phase 1 of the Erosion
Control/Environmental Enhancement Plan at Islington Golf Club municipally described
as 45 Riverbank Drive in the City of Toronto (Etobicoke York). The scope of the
proposed works include the realignment and restoration of a portion of Mimico Creek,
reconstruction of the 18th hole approach and green, reconstruction of the 10th tee,
construction of a new pedestrian bridge, and reconfiguration of the existing terracing and
patios at the rear of the existing clubhouse. Two existing pedestrian bridges are to be
removed.
CFN: 58182 - Application #: 0777/171TOR
Report Prepared by: Nicole Moxley 5968 nmoxley@trca.on.ca
For information contact: Steve Heuchert 5311 sheuchert@trca.on.ca
Date: December 19, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
10.2 SORBARA/L&M G.P. INC.
To site grade on Lot 32, Concession 9, (North of 19th Avenue and Tenth Line), in the
Town of Whitch urch-Stouffville, Duffins Creek Watershed as located on the property
owned by Sorbara/L&M G.P. Inc. The purpose is to facilitate, within TRCA's Regulated
Area of the Duffins Creek watershed, preliminary site grading and filling to support a
future subdivision on the subject property. The subject property has no municipal
address but is located north of 19th Avenue and west of 10th Line in the Town of
W hitchurch-Stouffville.
CFN: 58709 - Application #: 1193/17/WS
Report Prepared by: Jackie Burkart 5304jburkart@trca.on.ca
For information contact: Jackie Burkart 5304jburkart@trca.on.ca
Date: December 20, 2017
RES.#B131/17 - STANDARD DELEGATED PERMITS
Moved by: Mike Mattos
Seconded by: Jennifer McKelvie
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
657
10.3 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years or less.
CITY OF BRAMPTON
20 GARRYOAKS DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 39.9 sq. m (429.32 sq. ft) addition located
on the rear of existing residential dwelling associated with a Municipal Building permit.
CFN: 58578 - Application #: 1129/17/13RAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: December 6, 2017
CITY OF MARKHAM
CIM MACKENZIE CREEK INC. - Rouge River Watershed
The purpose is to construct residential townhome units within a TRCA Regulated Area of the
Rouge River watershed associated with an approved Draft Plan of Subdivision (19TM-14014 -
CIM Global Development LP).
CFN: 58687 - Application #: 1229/17/MARK
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: October 18, 2017
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA - Mimico Creek Watershed
The purpose is to upsize an existing culvert in order to reduce flooding depth and provide safe
vehicular access along Rena Road, located approximately 600 m east of Torbram Road, in the
City of Mississauga. This work is being completed as a part of a commitment for the
reconstruction of Torbram Road (reviewed and approved under a separate TRCA permit No. C-
140902). The warm water construction timing window will apply to this project.
CFN: 53347 - Application #: 0249/151MISS
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: December 15, 2015
CITY OF PICKERING
1331240 ONTARIO LTD. - Frenchman's Bay Watershed
The purpose is to construct a new two-storey single family detached dwelling with an integral
garage to the front and new attached deck to the rear at 1953 Spruce Hill Road in the City of
Pickering.
CFN: 57890 - Application #: 0580/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 15, 2017
2296 HESKA ROAD - Petticoat Creek Watershed
The purpose is to construct a new two storey single family detached dwelling with an integral
garage at 2296 Heska Road in the City of Pickering.
CFN: 58864 - Application #: 1315/17/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vaubrey@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 14, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
1 ASHLEY PARK ROAD - Humber River Watershed
The purpose is to construct an in -ground pool in the rear yard of the existing dwelling at 1
Ashley Park Road in the City of Toronto (Etobicoke York).
CFN: 58101 - Application #: 0718/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: November 14, 2017
37 RIVERSIDE CRESCENT - Humber River Watershed
The purpose is to construct a new two-storey single family detached dwelling at 37 Riverside
Crescent in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58415 - Application #: 0997/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 12, 2017
49A EAST DRIVE - Humber River Watershed
The purpose is to construct of a new semi-detached residential dwelling unit at 49A East Drive
in the City of Toronto (Etobicoke York). The existing single family detached dwelling is to be
demolished.
659
CFN: 58939 - Application #: 1371/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 7, 2017
49B EAST DRIVE - Humber River Watershed
The purpose is to construct of a new semi-detached residential dwelling unit at 39B East Drive
in the City of Toronto (Etobicoke York). The existing single family detached dwelling is to be
demolished.
CFN: 58940 - Application #: 1362/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 7, 2017
VOREON INC. - Humber River Watershed
The purpose is to construct a two storey single family dwelling with integral garage at 7 Edgehill
Road in the City of Toronto (Etobicoke York Community Council Area).
CFN: 56399 - Application #: 0839/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 6, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
40 BANNATYNE DRIVE - Don River Watershed
The purpose is to construct a new two-storey single family detached dwelling at 40 Bannatyne
Drive in the City of Toronto (North York Community Council Area).
CFN: 58191 - Application #: 0808/171TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 7, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Highland Creek Watershed
The purpose is to continue undertaking upgrades at the Highland Creek Wastewater Treatment
Plant, located at 51 Beechgrove Drive, north of Copperfield Road. Works will involve
construction of new buildings and services, as well as expansion and upgrades to site facilities,
followed by restoration of the site. The warm water construction timing window of July 1 to
March 31 will apply to this proposal.
CFN: 58885 - Application #: 1388/17/TOR
Report Prepared by: Daniel Brent, extension 5774, email dbrent@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: December 12, 2017
••l
426 LAWSON ROAD - Waterfront Watershed
The purpose is to construct a two storey addition on the west side of the existing dwelling, a one
storey addition with basement and attached deck to the rear, shed, and greenhouse at 426
Lawson Road in the City of Toronto (Scarborough Community Council Area).
CFN: 58972 - Application #: 1385/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step h an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 15, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CAPREIT LLP - Don River Watershed
The purpose is to create a one bedroom suite on the fourth floor of the existing apartment
building through interior renovations at 7 Park Vista in the City of Toronto (Toronto and East
York Community Council Area).
CFN: 58974 - Application #: 1391/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 11, 2017
CITY OF VAUGHAN
BELMONT PROPERTIES (WESTON) INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to maintain a Stormwater Management Pond in Block 40 South within the
City of Vaughan.
CFN: 57918 - Application #: 0624/17/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: December 20, 2017
CITY OF VAUGHAN - Humber River Watershed
The purpose is to replace culvert, rehabilitate retaining walls, stormwater outlets on Clarence
Street between Modesto Gardens and Wycliffe Avenue, in the City of Vaughan, Regional
Municipality of York. The warm water construction timing window will apply to proposal.
CFN: 56657 - Application #: 1230/16/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: December 18, 2017
661
TOWN OF CALEDON
2295943 ONTARIO INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 264.05 sq. m (2,842.21 sq. ft.) two-storey
addition to an existing two-storey commercial building associated with a municipal site plan
application (Town File No. SPA 13-47) and building permit application. The subject property is
located at 38 Queen Street South, in the Town of Caledon.
CFN: 50162 - Application #: 0987/131CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: December 6, 2017
16062 HUMBER STATION ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 4.87 m (16 ft) by 12.19 m (40 ft) pool
cabana, 5.5 m (18 ft) by 11 m ( 36 ft) in -ground pool, and 9.09 (29.8 ft) by 16.56 m (54.3 ft)
garage located at the rear of an existing residential dwelling associated with Site Plan
Application (Town File #SPA -15-0034) and municipal building permit.
CFN: 58753 - Application #: 1265/17/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: December 14, 2017
TOWN OF CALEDON - Humber River Watershed
The purpose is to partially urbanize Innis Lake Road from Old Church Road to 15924 Innis Lake
Road, in the Town of Caledon. The Redside Dace construction timing window will be applied to
this project unless otherwise specified in writing by the Ministry of Natural Resources and
Forestry (MNRF).
CFN: 57836 - Application #: 0574/171CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: December 12, 2017
TOWN OF RICHMOND HILL
36 PANDORA COURT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a 13.6 sq.m (146.3 sq.ft) solarium located at
the rear of an existing dwelling associated with a municipal Minor Variance application (Town
File: A109/17) and building permit.
CFN: 58667 - Application #: 1181/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: December 14, 2017
662
TOWN OF WHITCHURCH-STOUFFVILLE
WILLOWGROVE DAY CAMP - Rouge River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Rouge River watershed, the
development of a 131 sq. m. (1416 sq. ft.) one storey addition to an existing dwelling and new
septic system on lands known municipally as 11737 McCowan Road, in the Town of
W hitchurch-Stouffville.
CFN: 58787 - Application #: 1310/171WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: December 14, 2017
TOWNSHIP OF KING
12673 JANE STREET - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River watershed, the
development of a 199 sq. m. (2148.8 sq. ft.) single residential dwelling, 69.8 sq. m. (751 sq. ft.)
garage, septic system, and associated landscaping on lands known municipally as 12673 Jane
Street, in the Township of King.
CFN: 58968 - Application #: 1374/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: December 13, 2017
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF MARKHAM
REGIONAL MUNICIPALITY OF YORK
To undertake structure maintenance, sewer, watermain or utility watercourse crossing by
trenchless technology at Robinson Creek between Bullock Drive and Wilson Street, in the City
of Markham, Rouge River Watershed as located on the property owned by Regional
Municipality of York and the City of Markham. The purpose is to undertake relining of the
existing 600mm Ductile Iron (D.l) substandard watermain with a Cured in Place (CIP) structural
liner crossing under Robinson Creek between Bullock Drive and Wilson Street, in the City of
Markham.
663
CFN: 58872 - Application #: 1306/17/MARK
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: December 12, 2017
CITY OF PICKERING
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain, utility installation or maintenance within an existing roadway
and to undertake sewer, watermain, utility watercourse crossing by trenchless technology along
Bayly Street, west of Liverpool Road and east of West Shore Boulevard, in the City of Pickering,
Frenchman's Bay Watershed as located on property owned by the Regional Municipality of
Durham. The purpose is to install a 100 mm diameter conduit for Rogers Communications
Canada Inc. along Bayly Street, west of Liverpool Road and east of West Shore Boulevard, in
the City of Pickering. The warm water construction timing window will apply to this project.
CFN: 58471 - Application #: 1157/17/PICK
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: December 8, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Chalkfarm Drive, 160 Chalkfarm Drive, 170 Chalkfarm Drive, 180 Chalkfarm Drive
and 200 Chalkfarm Drive, west of Jane Street, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed as located on property owned by the City
of Toronto and private property with permission obtained. The purpose is to install conduit and
grade level boxes. No in -water work is within the scope of this project.
CFN: 58259 - Application #: 0960/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 11, 2017
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Falstaff Avenue and 20 Falstaff Avenue, near Jane Street and Highway 401, in the City of
Toronto (North York Community Council Area), Humber River Watershed as located on City of
Toronto -owned property and private property with permission obtained. The purpose is to install
conduit. No in -water work is within the scope of this project.
CFN: 57298 - Application #: 1288/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 13, 2017
•M
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 636 - 686 Finch Avenue East, in the City of Toronto (North York Community Council Area),
Don River Watershed as located on privately owned property with permission obtained. The
purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 57299 - Application #: 1289/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 13, 2017
SUN -CANADIAN PIPELINE COMPANY LTD.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Finch Avenue Hydro Corridor, located west of Sentinel Road near Murray Ross Parkway, in
the City of Toronto (North York Community Council Area), Humber River Watershed as located
on property owned by Hydro One Networks Inc. The purpose is to excavate a portion of
existing pipeline to inspect and undertake potential maintenance. No in -water work is within the
scope of this project.
CFN: 57280 - Application #: 1100/17ITOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 13, 2017
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Logan Avenue, Eastern Avenue, Pape Avenue and Laneways (Lane 1 South Eastern West
Logan, Lane 1 South Eastern East Logan, Lane 1 South Eastern West Carlaw, Lane 1 Eastern
West Pape), in the City of Toronto (Toronto and East York Community Council Area),
Waterfront Watershed as located on property owned by the City of Toronto. The purpose is to
install conduit. No in -water work is within the scope of this project.
CFN: 57294 - Application #: 1263/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 19, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on the Rosehill Reservoir, located
near Rosehill Avenue and Avoca Avenue, southeast of Yonge Street and St. Clair Avenue East,
in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed
as located on property owned by the City of Toronto. The purpose is to construct a temporary
walkway and boardwalk. No in -water work is within the scope of this project.
CFN: 54608 - Application #: 0978/151TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Daniel Brent, extension 5774, email dbrent@trca.on.ca
Date: December 19, 2017
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Broadview Avenue from Hogarth
Avenue to Langley Avenue, in the City of Toronto (Toronto and East York Community Council
Area), Don River Watershed as located on the property owned by the City of Toronto. The
purpose is to undertake track allowance reconstruction and road resurfacing. No in -water work
is within the scope of this project.
CFN: 58791 - Application #: 1308/171TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: December 11, 2017
CITY OF VAUGHAN
POWER STREAM INC.
To undertake utility pole installation on Centre Street and Dufferin Street, in the City of
Vaughan, Don River Watershed as located on the property owned by Regional Municipality of
York. The purpose is to undertake relocation of hydro poles and construction of underground
duct bank along Centre Street and Dufferin Street. The new poles will be installed using the
Vac -System technique with backfill. The proposed relocation is required to accommodate the
widening of Highway 7 and is associated with the VIVA Bus Rapid Transit Project.
CFN: 58845 - Application #: 1324/17NAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: December 18, 2017
POWER STREAM INC.
To undertake utility pole installation on, Highway 7, west of Bruce Street to west of Pine Valley
Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by
Regional Municipality of York The purpose is to undertake relocation of poles and guying along
Highway 7 and from west of Bruce Street to west of Pine Valley Drive. The new poles will be
installed using the Vac -System technique with backfill. The proposed relocation is required to
accommodate the widening of Highway 7 and is associated with the VIVA Bus Rapid Transit
Project.
CFN: 58878 - Application #: 1367/17/VAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: December 13, 2017
• • •
REGIONAL MUNICIPALITY OF YORK
To undertake road resurfacing on Rutherford Road, from Islington Avenue to Pine Valley Drive,
in the City of Vaughan, Humber River Watershed as located on the property owned by the
Regional Municipality of York. The purpose is to resurface Rutherford Road from Islington
Avenue to Pine Valley Drive. The Redside Dace fisheries timing window applies to this project,
unless otherwise stated in writing by the Ministry of Natural Resources and Forestry.
CFN: 58856 - Application #: 1328/17NAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: December 21, 2017
TOWN OF AJAX
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology along a
future street named Harrisview Street, located west of Church Street North and north of
Rossland Road, in the Town of Ajax, Duffins Creek Watershed as located on property owned by
the Town of Ajax under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose
is to install a NPS 4 PE IP gas main under a culvert in order to service a new subdivision, which
was previously approved by TRCA in 2017 under Permit No. C-170003. The Redside Dace
fisheries timing window applies to this project, unless otherwise stated in writing by the Ministry
of Natural Resources and Forestry (MNRF).
CFN: 58617 - Application #: 1260/17/AJAX
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: December 19, 2017
TOWN OF AJAX
To undertake off-line stormwater management pond maintenance north of Rossland Road
West, just west of Ravenscroft Road, in the Town of Ajax, Duffins Creek Watershed as located
on the property owned by Town of Ajax. The purpose is to undertake routine stormwater
management pond maintenance including sediment removal and the installation of an oil grit
separator (OGS) north of Rossland Road West just west of Ravenscroft Road, in the Town of
Ajax. The warm water construction timing window will be applied to this project.
CFN: 58284 - Application #: 0883/17/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: December 19, 2017
TOWN OF AJAX
To undertake structure maintenance at the Taunton Road and Harwood Avenue intersection, in
the Town of Ajax, Duffins Creek Watershed as located on property owned by the Town of Ajax.
The purpose is to repair an existing damaged culvert at the Harwood Avenue and Taunton
Road intersection, in the Town of Ajax. Works will include the replacement of six culvert panels
on top of the culvert at the west end. The warm water construction timing window will apply to
this project.
667
CFN: 58467 - Application #: 1035/17/AJAX
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: December 21, 2017
TOWN OF WHITCHURCH-STOUFFVILLE
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway at 34 Somerville Street near Market Street, in the Town of Whitch urch-StouffviIle,
Duffins Creek Watershed as located on property owned by the Town of Whitchurch-Stouffville.
The purpose is to install a Bell grade level box (GLB) and a conduit from the proposed GLB to
an existing hydro pole on the south side of Somerville Street. The coldwater construction timing
window applies to this project. A timing window extension has been granted.
CFN: 58454 - Application #: 1127/17NVS
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: December 22, 2017
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway at 12731 Highway 48, in the Town of Whitch urch-StouffviIle, Rouge River Watershed
as located on the property owned by the Ministry of Transportation. The purpose is to
undertake the construction of a conduit connection from an existing pole to an existing sub duct.
The coldwater construction timing window (July 1 to September 15) applies to this project
unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF).
Due to the minor nature and short duration of works and anticipated frozen conditions during
construction, a timing window extension of December 15, 2017 to February 15, 2018 has been
granted.
CFN: 58595 - Application #: 1366/17MS
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: December 20, 2017
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
• • i
CITY OF MARKHAM
30 KING RICHARD COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 213, Plan
5810-Y, (30 King Richard Court), in the City of Markham, Rouge River Watershed.
CFN: 59147 - Application #: 1453/17/MARK
Report Prepared by: Grace Conte, extension 5271, email gconte@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: December 21, 2017
CITY OF PICKERING
1815 FAIRPORT ROAD, UNIT 12
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 40M-
2519, (1815 Fairport Road, Unit 12), in the City of Pickering, Frenchman's Bay Watershed.
CFN: 58323 - Application #: 0941/171PICK
Report Prepared by: Stephanie Worron, extension 5907, email
stephan i e.worron@trca.o n. ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 19, 2017
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
5 ALHART DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538
sq. ft) on Lot 186, Plan M 688, (5 Alhart Drive), in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed.
CFN: 58925 - Application #: 1341/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: December 7, 2017
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
5 DAULT ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 188, Plan 1902, (5 Dault Road), in the City of Toronto
(Scarborough Community Council Area), Waterfront Watershed.
CFN: 58982 - Application #: 1405/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 19, 2017
• • 0
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
110 PARK ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 22, Plan 104,
(110 Park Road), in the City of Toronto (Toronto and East York Community Council Area), Don
River Watershed.
CFN: 58948 - Application #: 1383/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: December 11. 2017
CITY OF VAUGHAN
43 BELSITE COURT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 2, 3, Plan 65M-2955, (43
Belsite Court), in the City of Vaughan, Humber River Watershed.
CFN: 58603 - Application #: 1148/171VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: December 20, 2017
1 PELEE AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 83, Plan 65M-4374, (1 Pelee Avenue), in the City of
Vaughan, Humber River Watershed.
CFN: 59137 - Application #: 1411/17NAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: December 19, 2017
TOWN OF RICHMOND HILL
44 PHEASANT DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 41, Plan
65M-4220, (44 Pheasant Drive), in the Town of Richmond Hill, Humber River Watershed.
CFN: 58652 - Application #: 1398/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: December 21, 2017
670
65 ROUTLEDGE DRIVE
To install a swimming pool on Lot 27, Plan 65M-3854, (65 Routledge Drive), in the Town of
Richmond Hill. Humber River Watershed.
CFN: 58971 - Application #: 1378/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: December 21, 2017
47 GAMBLE GLEN CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft), on (47 Gamble
Glen Crescent), in the Town of Richmond Hill, Don River Watershed.
CFN: 58404 - Application #: 1428/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: December 21, 2017
PERMIT APPLICATION 10.4 IS A MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF VAUGHAN
10.4 270437478 ONTARIO LTD.
To construct, reconstruct, erect or place a building or structure and alter a watercourse
on Lot 18, 19, 20, Concession 5 Plan 65R-12731, (9580 Jane Street), in the City of
Vaughan, Don River Watershed as located on the property owned by 270437478
Ontario Ltd. The purpose is to alter a waterway to construct in the Regional Storm
Floodplain of the Don River in order to facilitate the construction of a by-pass channel
and structure amenity located on Part Lot 18-20, Concession 5, 9580 Jane Street, in the
City of Vaughan within the Don River Watershed.
CFN: 58858 - Application #: 1354/17/VAUG
Report Prepared by: Colleen Bonner 5307 cbonner@trca.on.ca
For information contact: Colleen Bonner 5307 cbonner@trca.on.ca
Date: January 9, 2018
671
TERMINATION
ON MOTION, the meeting terminated at 9:45 a.m., on Friday, January 12, 2018.
Maria Augimeri
Chair
/ks
672
John MacKenzie
Secretary -Treasurer
Toronto and Region
Conservation
Authority
Executive Committee Meeting #12/17 was held at TRCA Head Office, on Friday, February
9, 2017. The Chair Maria Augimeri, called the meeting to order at 9:32 a.m.
PRESENT
Maria Augimeri Chair
Anthony Perruzza Member
PRESENT VIA TELECONFERENCE
Jack Heath
Vice Chair
Jack Ballinger
Member
Vincent Crisanti
Member
Glenn De Baeremaeker
Member
Chris Fonseca
Member
Brenda Hogg
Member
Jennifer Innis
Member
Colleen Jordan
Member
Mike Mattos
Member
Jennifer McKelvie
Member
RES413132/17 - MINUTES
Moved by: Anthony Perruzza
Seconded by: Colleen Jordan
THAT the Minutes of Meeting #11/17, held on January 12, 2018, be approved.
CARRIED
CONFLICT OF INTEREST
Jennifer McKelvie declared a conflict in regard to item 10.3 — Governing Council of the
University of Toronto, as she sits on the University of Toronto Scarborough Campus Council.
673
Section II — Items for Executive Action
RES.#8133/17 - ONTARIO MUNICIPAL BOARD
Request for Authorization to Appear. Authorization for staff to appear
before the Ontario Municipal Board, and if needed, retain legal counsel on
appeals within the Toronto and Region Conservation Authority jurisdiction.
Moved by: Jack Ballinger
Seconded by: Colleen Jordan
THAT authorization be given to Toronto and Region Conservation Authority (TRCA) staff
to participate in, and if needed, retain legal counsel to protect TRCA's interests before the
Ontario Municipal Board (OMB) regarding the appeals described within this staff report;
THAT TRCA staff continue to work cooperatively with TRCA's municipal partners and the
appellants to ensure TRCA's interests are implemented as part of the OMB process;
AND FURTHER THAT the OMB and all parties to the hearings be so advised.
CARRIED
BACKGROUND
Policy 7.5.2 p of The Living City Policies for Planning and Development in the Watersheds of the
Toronto and Region Conservation Authority states that, "TRCA staff obtain authorization from
TRCA's Authority Board/Executive Committee to appear before tribunals on planning and
development matters'. Staff is seeking authorization to appear before the OMB, and if needed,
retain legal counsel on appeals within the TRCA jurisdiction.
Currently, TRCA staff has identified 29 Planning Act applications that have been appealed to the
OMB for which TRCA's interests are affected. Ten of which are located within the Region of
Peel; 14 within the Region of York; and five within the City of Toronto.
The majority of these applications (i.e. 67%) were appealed to the OMB based upon the failure of
the municipalities to render a decision on the application within the prescribed timeline. The
remaining applications (i.e. 33%) are appeals to the decision of the municipality. TRCA staff is
seeking either "Party" or "Participant" status in these appeals because TRCA has an interest from
a policy or regulatory perspective, and in many cases is assisting TRCA's municipal partners.
"Party" status refers to a person or organization that requests full involvement in the hearing and
is recognized by the Board. Parties take part in the hearing by exchanging documents,
presenting evidence, questioning witnesses and making submissions to the Board. Parties may
also request costs, adjournments or a review of the decision.
"Participant" status refers to a person or organization that participates by making a statement to
the Board on some or all of the issues at a hearing. A Participant may attend all or only part of
the proceedings. Participants are not required to make submissions to council before becoming
involved in an OMB matter. When making a statement to the Board, Participants must swear to
tell the truth. They maybe questioned by the Board and other parties. Participants generally do
not question witnesses and cannot ask for costs, adjournments or request a review of the
decision.
674
In most cases, TRCA staff alone represents the interests of TRCA during the OMB process.
However, in certain circumstances, TRCA staff retains legal counsel to ensure TRCA's interests
are protected and addressed during the course of the OMB proceedings. Instances where staff
would require legal counsel include bringing forward a motion to the Board for consideration,
when the hearing enters into formal adjudication, when TRCA needs to cross-examine experts
representing other Parties, or when the appeal is complex involving legal matters where staff
requires guidance. In all cases, TRCA staff and retained legal counsel continue to work with the
Parties and Participants to the hearing in an attempt to resolve TRCA's issues, scope TRCA's
involvement and to reduce legal fees to the greatest extent possible.
RATIONALE
Attachment 1 includes summaries of each appeal, which are organized by municipality, and
whether they are site-specific or pertain to new municipal official plans or secondary plans. The
appeals are at various stages in the OMB process, and some have hearing dates set for as early
as February and March of 2018. As such, staff is requesting authorization to appear before the
Board for these appeals and will continue to bring forward future requests as per the direction
within The Living City Policies.
FINANCIAL DETAILS
Account Code 110-99-316 has been established to provide for TRCA's legal services fees related
to Planning and Development matters.
DETAILS OF WORK TO BE DONE
Staff will continue to represent the interests of TRCA during any mediation and scoping
processes. Should the need arise, TRCA staff is requesting authorization of the Executive
Committee to retain legal counsel to ensure TRCA's interests, as identified above, are protected
and addressed. TRCA staff and retained legal counsel will continue to work with the parties and
participants to the hearing in an attempt to resolve TRCA's issues, and to reduce legal fees to the
greatest extent possible.
Report prepared by: Leilani Lee -Yates, extension 5370
Emails: Ilee-yates(a)trca.on.ca
For Information contact: Leilani Lee -Yates, extension 5370
Emails: Ilee-yates(d)trca.on.ca
Date: January 26, 2018
Attachments: 1
675
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
Attachment 1
of Peel
Municipality:
Town of Caledon
OMB Case No.:
PL160237
TRCA Staff Contact:
Adam Miller and Quentin Hanchard
TRCA CFN:
55115.02
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
The subject property is located at
13471 Heart Lake Road, located on the
east side of Heart Lake Road, between
King Street and Old School Road, and
is legally described as Lot 25,
Concession 3, Town of Caledon,
Region of Peel.
Within the Humber River watershed
and is regulated by TRCA.
The applicant is seeking to obtain
consent in order to sever the parcel of
land having a total area of 1.3 acres.
Town staff recommended refusal of the
application; however, the Town
Committee of Adjustment (COA)
approved the application. Through
Council Resolution, the COA decision
was appealed to the OMB by Town
staff.
Subject property and proposed new lot
is located within the Regulatory
Floodplain.
The PPS and TRCA's The Living City
Policies (LCP) do not support new
development within the Regulatory
Floodplain.
Under the Provincial Policy Statement
(PPS) and TRCA's LCP, the creation of
a new lot is considered to be new
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
LG -
Official Plan (OP)
The OMB Hearing scheduled for
January 7, 2017, has been adjourned
to no fixed date in order to allow the
parties to continue settlement
discussions. As no Prehearing
Conference was arranged, TRCA
presently has no status in the hearing.
Staff will monitor the settlement
discussions. It may be necessary for
TRCA to schedule a motion for a
hearing of the TRCA's request for Party
Status in this matter.
Tentatively, a motion hearing to request
Party Status is scheduled for March 12,
2018.
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
2.
Municipality:
Proponent and
The subject property is located at 40
A hearing date is set for February 27,
Town of Caledon
Appellant:
Diamondwood Dr. in Palgrave.
2018.
Carolos and Mary Ann
Within the Humber River watershed on
TRCA is seeking Party Status to the
OMB Case No.:
Pacheco
the Oak Ridges Moraine and is
hearing.
PL170683
regulated by TRCA (i.e. within a
wetland area of interference).
TRCA Staff Contact:
Through the approved Draft Plan of
Leilani Lee -Yates and Quentin
Subdivision (DPS), building envelopes
Hanchard
were established for each lot. The
areas outside of the building envelope
TRCA CFN:
form part of the overall reforestation
57054.06
and restoration area and development
is prohibited in these areas.
The applicant submitted a Minor
Variance application to amend the
building envelope to facilitate the
construction of a pool and related
amenity uses.
TRCA did not support the application,
and the Town of Caledon Committee of
Adjustment denied the application.
3.
Municipality:
Proponent and
The subject property is located at 9124
A Prehearing Conference was held on
City of Brampton
Appellant:
Dixie Road, located on the west side of
September 27, 2016, and January 24,
582302 Ontario
Dixie Road, north of Queen Street, and
2017. TRCA staff attended both
OMB Case No.:
Limited
is legally described as Part East 1/2 Lot
prehearings and obtained Party Status.
PL110363
6, Concession 3, City of Brampton,
A 3rd Prehearing Conference is
Region of Peel.
scheduled for February 26, 2018 to
TRCA Staff Contact:
Within the Etobicoke Creek watershed
provide an update to the Board on the
Adam Miller and Quentin Hanchard
and is partially regulated by TRCA.
progress of the review.
The applicant is proposing an Offical
The Board has adjourned the hearing
TRCA CFN:
Plan Amendment (OPA), Zoning By-law
at this time and has yet to set a date.
42648
Amendment (ZBA), DPS, and Draft
Plan of Condominium (DPC) to facilitate
the development of 11 residential units
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
677
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
consisting of 3 townhouses and 4 pairs
of semi-detached dwellings to be
developed as a freehold residential
development fronting on a common
element roadway.
The applications were appealed to the
OMB by the applicant, because Council
has not made a decision within the
prescribed time period under the
Planning Act.
A tributary of the Etobicoke Creek is
adjacent to the property to the south.
Natural heritage features, natural
hazards and buffers have not been
delineated to the satisfaction of TRCA.
4.
Municipality:
Proponent and
The subject property is located at 174
Hearing date set for February 21, 2018
Brampton
Appellant:
Kennedy Road South, located on the
TRCA participation / Party Status to be
Wam Kennedy Road
east side of Kennedy Road South,
determined.
OMB Case No.:
LP
north of Steeles Avenue East, in the
PL17081
City of Brampton.
Within the Etobicoke Creek watershed
TRCA Staff Contact:
and is partially regulated by TRCA.
Anant Patel and Adam Miller
The applicant is proposing ZBA and
Site Plan Approval applications to
TRCA CFN:
facilitate the construction of an
55713.02
industrial warehouse.
55136.18
City of Brampton Council denied the
application as the approval. As such,
the applicant has appealed Council's
decision to the OMB.
TRCA staff has identified a concern
with the potential feature bisecting the
property that would be fragmented with
the proposed development.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
5.
Municipality:
Proponent and
The subject property is located at 3255
A Prehearing Conference meeting was
City of Brampton
Appellant:
Countryside Drive, located on the south
held on October 11, 2017.
Treasure Hill Homes/
side of Countryside Drive and east of
TRCA staff attended and was granted
OMB Case No.:
Flintshire Building
Airport Road, City of Brampton, Region
Party Status.
PL170607
Group Corporation
of Peel.
The Board set a second Prehearing
Within the Humber River watershed
Conference for March 8, 2018.
TRCA Staff Contact:
and is regulated by TRCA.
A Hearing is scheduled for July 9, 2018
Adam Miller
The applicant is proposing an OPA,
and to continue for eight days.
ZBA, and DPS to facilitate the
The parties have agreed to establish a
TRCA CFN:
development of 67 detached residential
series of working meetings in an effort
56027
dwellings.
to address and scope issues in
The applications were appealed to the
advance of finalizing the Procedural
OMB by the applicant, because Council
Order and Issues List.
has not made a decision within the
prescribed time period under the
Planning Act.
A tributary of the West Humber River
bisects the subject property, which is
the former Castlemore Golf Course.
The majority of natural heritage
features have been assessed, studied
and delineated to the satisfaction of
TRCA.
Outstanding environmental, functional
servicing, stormwater management
(SWM), geotechnical engineering and
hydrogeology related concerns are
being reviewed as a component of the
appellant's recent resubmission
received on November 1, 2017.
6.
Municipality:
Proponent and
The subject property is located at 9149
No Prehearing and/or Hearing has
City of Brampton
Appellant:
Goreway Drive, north of Queen Street
been scheduled to date.
National Homes
East, east of Goreway Drive, City of
TRCA intends to request Party Status.
OMB Case No.:
(Goreway)
Brampton, Region of Peel.
PL171155
Incorporated
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
•
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
Within the Humber River watershed
TRCA Staff Contact:
and is regulated by TRCA.
Anent Patel
The site is adjacent to Claireville
Conservation Area.
TRCA CFN:
The applicant is proposing an OPA,
CFN 57745
ZBA, and DPS to facilitate the
development 168 residential townhouse
units.
The applications were appealed to the
OMB by the applicant, because Council
has not made a decision within the
prescribed time period under the
Planning Act.
A tributary of the Humber River
watershed bisects the subject property.
Outstanding environmental, functional
servicing, SWM, and floodplain related
concerns have been identified and
remain outstanding.
7.
Municipality:
Proponent and
The subject property is located at 3255
A Prehearing Conference meeting was
City of Brampton
Appellant:
Countryside Drive, located on the south
held on October 11, 2017.
Treasure Hill Homes /
side of Countryside Drive and east of
TRCA staff attended and was granted
OMB Case No.:
Flintshire Building
Airport Road, City of Brampton, Region
Party Status.
PL170607
Group Corporation
of Peel.
The Board set a second Prehearing
Within the Humber River watershed
Conference for March 8, 2018.
TRCA Staff Contact:
and is regulated by TRCA.
A Hearing is scheduled for July 9, 2018
Adam Miller
The applicant is proposing an OPA,
and to continue for eight days.
ZBA, and DPS (DPS) to facilitate the
The parties have agreed to establish a
TRCA CFN:
development of 67 detached residential
series of working meetings in an effort
56027
dwellings.
to address and scope issues in
The applications were appealed to the
advance of finalizing the Procedural
OMB by the applicant, because Council
Order and Issues List.
has not made a decision within the
prescribed time period under the
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
LTI •
• 1
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
Planning Act.
A tributary of the West Humber River
bisects the subject property, which is
the former Castlemore Golf Course.
The majority of natural heritage
features have been assessed, studied
and delineated to the satisfaction of
TRCA.
Outstanding environmental, functional
servicing, SWM, geotechnical
engineering and hydrogeology related
concerns are being reviewed as a
component of the appellant's recent
resubmission received on November 1,
2017.
8.
Municipality:
Proponent and
The proponent is proposing to develop
A Pre -hearing Conference was held on
City of Brampton
Appellant:
an 18.75 ha property (46.32 ac) at the
November 9, 2017, at which time TRCA
Burnt Log
southeast corner of Countryside Dr.
staff was granted Party Status to the
OMB Case No.:
Management Inc.
and Heart Lake Rd, in the City of
hearing.
PL170473
Brampton. The proposed condominium
TRCA is meeting with City of Brampton
development consists of 479 residential
staff and the appellant to scope and
TRCA Staff Contact:
units (subject to final calculations);
resolve our issues.
Leilani Lee -Yates and Quentin
internal condominium roads; one
A hearing date has not been set.
Hanchard
municipal road; and environmental
protection blocks.
TRCA CFN:
The subject property contains three
43994
Provincially Significant Wetlands (PSW)
within the Heart Lake Wetland
Complex, two Woodlots, and one
Tributary of the Etobicoke Creek
watershed.
The PSWs and Tributary are identified
as Core Areas of the Region of Peel
Greenlands System within the Region
of Peel Official Plan (ROP). The
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
LTI •
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
Woodlot features are less than 4 ha in
size, but are contiguous to the PSWs
and Tributary, and as such are Natural
Area and Corridors (NACs) within the
Region of Peel Greenlands System.
The natural heritage features and areas
are further designated as PSWs,
"ValleylandlWatercourse Corridor" and
"Woodland" on Schedule D of the City
of Brampton Official Plan (OP). TRCA
regulates development 120 m from
PSWs, and 15 m from the greater of the
natural hazard limit associated with the
Tributary.
Draft Plan of Condominium application
has been appealed to the OMB by the
applicant, because Council has not
made a decision within the prescribed
time period under the Planning Act.
9.
Municipality:
Proponent and
The subject property is located at 3085
A Prehearing Conference meeting was
City of Mississauga
Appellant:
Queen Frederica Drive, located on the
held August 21, 2018.
Queen Frederica
west side of Dixie Road, north of
TRCA staff attended and was granted
OMB Case No.:
Incorporated
Dundas Street, south of Little Etobicoke
Party Status.
PL16128
Creek, and is legally described as Part
A Hearing is scheduled for February
Block F, Registered Plan 784, City of
28, 2018 and to continue for four days.
TRCA Staff Contact:
Mississauga, Region of Peel.
Adam Miller and Quentin Hanchard
Within the Etobicoke Creek watershed
and is regulated by TRCA.
TRCA CFN:
The applicant is proposing a draft plan
54291
of condominium to covert the existing
11 -Storey apartment building (73 units)
to a 73 residential unit condominium.
The entire site is located within the
Regulatory Floodplain and hydraulic
floodway of the Little Etobicoke Creek,
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
010YA
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
Town of Whitchurch-Stoufville
OMB Case No.:
PL160770
TRCA Staff Contact:
Jackie Burkart and June Little
TRCA CFN:
55090.02
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Appellant:
Savena Cove Homes
Inc.
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
and within the Applewood Special
Policy Area (SPA).
City of Mississauga Council denied the
application as the approval would result
in redevelopment in the floodplain
which is prohibited by the PPS and City
OP. As such, the applicant has
appealed Council's decision to the
OMB.
The PPS, City OP and TRCA's LCP do
not support new development, which
also constitutes redevelopment, within
the Reaulatory Floodplain.
The subject property is located on the
east side of Ninth Line north of
Bayberry Avenue and south of
Bethesda Road in the community of
Stouffville and is legally described as
Part of Lot 4, Concession 9, Town of
Whitchurch-Stouffville in the Regional
Municipality of York.
These lands are within the OPA137
area. OPA 137 amends the Community
of Stouffville Secondary Plan.
The applicant is proposing a 145 -lot
residential plan of subdivision
consisting of single family detached
homes, a 6.00 hectare School Block, an
Open Space Block and a SWM Block.
The lands are partially within a flood
plain and there is a drainage divide on
the property with the western part of the
property draining to the Rouge
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
0• •
Official Plan (OP)
A Pre -Hearing Conference (PHC) was
held on January 24, 2017. TRCA
attended and was granted Party Status.
A second PHC was held June 26,
2017. Savena advised to secure permit
under Ontario Regulation (O.Reg.)
166/06.
The Board set a third pre -hearing
conference for March 7, 2018.
Savena Cove Homes Inc. applied for,
and received a permit for wetland
enhancement/ flood remediation in
2017. TRCA has two outstanding
concerns with respect to the application
for DPS. Settlement is the expected
outcome; if not TRCA will likely
withdraw from any future hearing.
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Description of Application
Status
Appellant(s)
property draining to the Duffins Creek
watershed.
The applications were appealed to the
OMB by fur applicants within the OPA
137. The applications were appealed to
the OMB by four appellants based on
vague wording regarding cost-sharing
of services within the secondary plan
area.
11.
Municipality:
Proponent and
2710 King Rd and 13371 Jane Street
A Pre -Hearing conference has been
Township of King
Appellant:
These lands are within the King City
scheduled for February 28, 2018.
Mansions of King
Community Plan area.
TRCA intends to request Party Status.
OMB Case No.:
The applicant is proposing 68 single
TBD
detached residential dwellings and a
medium density residential block
TRCA Staff Contact:
intended to accommodate
Colleen Bonner and June Little
approximately 250 residential dwellings
in the form of townhouses and low-rise
TRCA CFN:
apartments. In addition, a stormwater
56286
block, Environmental Protection Areas
and buffers.
The lands are bisected by the East
Humber River valley corridor, three
tributaries of the East Humber River,
PSWs forming part of the Eaton Hall -
Mary Hackett Lake Wetland Complex,
estimated and engineered Regional
Storm Floodplain and woodlands.
Appealed for lack of municipal decision.
12.
Municipality:
Proponent and
46 Ashbridge Circle, Part of Lot 6,
A pre -hearing conference is scheduled
Township of King
Appellant:
Concession 8
for February 9, 2018.
Nobleton Estates Inc.
To facilitate the development of the
TRCA staff will be asking for Party
OMB Case No.:
1.21 hectare site with five residential
Status.
PL170853
lots, with additional blocks for open
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
LTs •
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
TRCA Staff Contact:
space and natural buffer purposes.
Coreena Smith and Mark Andrews
The proposed development would
obtain access from Northcott Way to
TRCA CFN:
the north via a block of land dedicated
52136
for road purposes. The lots would front
onto a new cul-de-sac bulb where lot
frontages would range from 10 to 15
metres. The development is predicated
on connection to both the municipal
water and sanitary sewer systems.
The lands are currently designated as
Residential in the Nobleton Community
Plan (OPA 57, as amended by OPA
570).
The subject lands are within the
Humber River watershed. Tributaries
of the East Humber River are situated
east and west-southwest of the subject
site.
The 1.21 hectares site belongs to a
larger 12 hectare parcel, which fronts
onto the 81h Concession Road.
Appealed for lack of municipal decision
on the 0PA1Z13A within 180/120 days,
13.
Municipality:
Proponent and
9681 Islington Avenue.
A pre -hearing conference is scheduled
City of Vaughan
Appellant:
Located on a pie -shaped parcel to the
for January 17, 2018.
Gatehollow Estates
west of TRCA's Restoration Services
TRCA staff was granted Party Status.
OMB Case No.:
Inc.
Centre and the Kortright Centre for
PL170836 and PL170837
Conservation and a valley corridor
associated with the East Humber River
TRCA Staff Contact:
traverses the subject property
Mark Andrews & June Little
The purpose of the above noted
applications is to permit a mixed-use
TRCA CFN:
development consisting of two
55134.03
apartment buildings, ranging from four
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
0• •
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Description of Application
Status
Appellant(s)
to seven storeys in height (Building 'A')
and three to 10 storeys in height
(Building 'B'). The proposed
development contains a total of 228
residential dwelling units and 232 mz of
retail and commercial uses on the
ground floor of Building 'B' with a gross
Floor Space Index of 2.43 times the
area of the lot. A total of 363 parking
spaces are proposed in a three-level
underground parking garage, and
vehicular access for parking and
loading is proposed via a consolidated
driveway from Islington Avenue.
Appealed for lack of municipal decision
on the OPA/ZBA within 180/120 days.
14.
Municipality:
Proponent and
9999 Highway 48
Multiple prehearings. TRCA is a Party.
City of Markham
Appellant:
Draft block plan of subdivision, Zoning
Hearings deferred until violation of
Villarmark / Villarboit
and site plan
TRCA O. Reg. and floodplain issues
OMB Case No.:
The applications were appealed to the
have been addressed.
PL121164
OMB by the applicant because City
Permit issued to contain 4 ha of
Council failed to make a decision on the
floodplain on a 12 he site within a
TRCA Staff Contact:
applications within the required
restored channel of Exhibition Creek
Doris Cheng and Quentin Hanchard
timeframe pursuant to the Planning Act.
within 1 he.
Lands sold.
TRCA CFN:
Prehearing with new owners December
57107
181h. Awaitin resubmission.
15.
Municipality:
Proponent and
Redevelopment of the Buttonville
TRCA was a Party and entered into
City of Markham
Appellant:
Airport.
minutes of settlement with respect to
CF/OT Buttonville
The application was appealed because
groundwater, and slope stability.
OMB Case No.:
the municipality did not make a decision
Recently, settlement discussions with
PL130548
within the prescribed timeline.
the City and the Region have failed.
TRCA needs to investigate status from
TRCA Staff Contact:
the OMB and may need to re-engage.
Doris Chang and Quentin Hanchard
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
LITS -11i
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Description of Application
Status
Appellant(s)
TRCA CFN:
46424.02
16.
Municipality:
Proponent and
Subdivision and Site plan, located north
Slope stability and long term stable
City of Markham
Appellant:
of Highway 407 and north of the Rouge
issues.
Garden Homes, 3
River (73 Main Street).
Contacting the OMB for more
OMB Case No.:
Townhouse Blocks
Townhouse redevelopment.
information.
TBD
The application was appealed because
Anticipated need for Party Status.
the municipality did not make a decision
No hearing date has yet to be
TRCA Staff Contact:
within the prescribed timeline.
scheduled.
Anthony Sun and Doris Cheng
TRCA CFN:
58865
17.
Municipality:
Proponent and
4131 16th Avenue, north side of 16th
Prehearing conference held November
City of Markham
Appellant:
Avenue, between Warden Avenue and
7, 2017. Second Prehearing scheduled
Sixteenth Land
Kennedy Road
in 2018.
OMB Case No.:
Holdings Inc.
Master Environmental Servicing Plan
TRCA was granted Party Status.
PL 170580
(MESP), Secondary Plan Amendment,
Currently reviewing 2nd submission.
Zoning Amendments and two draft
TRCA Staff Contact:
plans of subdivision.
Doris Cheng and Quentin Hanchard
To develop 168.58 hectares of land to
permit 2,421 residential units, school
TRCA CFN:
blocks, park blocks, road network,
57107
natural heritage system blocks, and
mixed use blocks.
Bruce and Berczy creeks bisect the
properties and associated floodplains.
PSW's also on site and high
groundwater.
The applications were appealed to the
OMB by the applicant because City
Council failed to make a decision on the
applications within the required
timeframe pursuant to the Planning Act.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
Lflexm
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Description of Application
Status
Appellant(s)
18.
Municipality:
Proponent and
The subject property is 4031 16th
TRCA staff attended the pre -hearing
City of Markham
Appellant:
Avenue in the City of Markham.
conference and requested Participant
4031 16th Avenue
The applications were appealed to the
Status on the basis that TRCA
OMB Case No.:
(Unionville) Inc.
OMB by the applicant because City
comments appear to have been
PL170690
Council failed to make a decision on the
addressed; however, staff wishes to
applications (OPA & ZBA) within the
ensure TRCA interests are protected.
TRCA Staff Contact:
required timeframe pursuant to the
A second pre -hearing conference has
Anthony Sun and Doris Cheng
Planning Act.
been scheduled for March 2018.
The proposal is an infill subdivision
TRCA CFN:
located adjacent to the Bercy Creek
55130.01
valley system. A wetland is also located
with the valley system.
19.
Municipality:
Proponent and
The subject property is 59 Brookside
A pre -hearing conference has been
Town of Richmond Hill
Appellant:
Dr. (formerly 47, 59 Brookside, 11014-
scheduled for January 16, 2018.
Yonge MCD Inc.
11076 Yonge St., 12 Naughton Dr.,
Based upon the last submissions
OMB Case No.:
now all merged together) in the Town of
(received in late 2016) TRCA staff will
PL170770
Richmond Hill.
likely seek Party Status as acceptable
The applications were appealed to the
development limits have not yet been
TRCA Staff Contact:
OMB by the applicant because City
established.
Anthony Sun and Doris Cheng
Council failed to make a decision on the
applications (OPA & ZBA) within the
TRCA CFN:
required timeframe pursuant to the
55948
Planning Act.
The proposal is a large infill mid -rise
and high-rise application, the site is
traversed by the valley corridor of a
tributary of the Rou a River.
20.
Municipality:
Proponent and
Proposal is a mid and high-rise
Correspondence from applicant's
City of Markham
Appellant:
residential proposal.
lawyer was provided to the City stating
National Homes
Site is located adjacent to buried
appeal has been submitted to the
OMB Case No.:
(Castlemore Ave.) Inc.
watercourse but remains partially within
Board.
PL 171207
or in very close proximity to the
First submission is currently still under
regulatory flood plain due to upstream
review.
TRCA Staff Contact:
issues.
Prehearing not yet scheduled.
AnthonySun and Doris Chen
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
Le • •
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
Application is currently a Site Plan
TRCA staff to determine whether they
TRCA CFN:
Application.
will request Party or Participant Status.
57001.27
The applications were appealed
because City Council failed to make a
decision on the applications within the
required timeframe pursuant to the
Planning Act.
21.
Municipality:
Proponent and
The subject property is located on the
TRCA evaluated the wetland and
Town of Richmond Hill
Appellant:
north side of 19th Avenue, west of
provided the information to the Ministry
Deergate Holdings
Leslie Street and east of Bayview
of Natural Resources and Forestry
OMB Case No.:
Inc.
Avenue, in the North Leslie Secondary
(MNRF) for determination of wetland
PL020446 (reactivated case file)
Plan Area.
status (Significance). OMB motion
Municipally known as 11546 Leslie
hearing deferred hearing to end of
TRCA Staff Contact:
Street in the Town of Richmond Hill,
March/early April.
Doris Cheng
Regional Municipality of York.
TRCA has been granted Party Status.
Within the Rough River watershed and
Consultant has engaged TRCA in
TRCA CFN:
is regulated by TRCA.
'without prejudice' discussions.
53532
The applicant is proposing a ZBA and
DPS to facilitate the creation of a
subdivision consisting of 352 single
detached dwellings, 113 townhouses,
78 semis, local roads, park blocks,
elementary school block, SWM blocks
and natural heritage system blocks.
The proposal includes the removal of a
t2ha wetland on the site which also is
within the Oak Ridges Moraine
Conservation Plan Area, which has yet
to be evaluated.
The applications were appealed to the
OMB by the applicant for Council's
failure to make a decision on the
applications within the prescribed time
period under the Planning Act.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
L16 •
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
22.
23.
VZ,I
Municipality:
Town of Richmond Hill
OMB Case No.:
PL171396
TRCA Staff Contact:
Anthony Sun
TRCA CFN:
55132.04
Municipality:
Town of Richmond Hill
OMB Case No.:
PL171444
TRCA Staff Contact:
Anthony Sun
TRCA CFN:
City of Toronto (Scarborough
Community Council Area)
OMB File No.:
PL161064
TRCA Staff Contact:
Mark Rapus and Steve Heuchert
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Proponent and
Appellant:
Vitmont Holdings (Oak
Ridges) Inc.
OPA
Proponent and
Appellant:
2522772 Ontario Inc. -
Zen Homes
D03-14002 (SUB),
D05-14003 (GOND),
D06-14038 (SP), D02-
14013(ZBA) and
D01-17007
Inc.
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Lofts
The proposed project includes an OPA,
ZBA, and Site Plan Application to
facilitate the construction of a new six -
storey residential structure with 50
residential units, at -grade parking,
landscaping, and associated grading.
The application was appealed because
the municipality did not make a decision
within the prescribed timeline.
Proposal for the construction of 13
residential townhouse units, of which
are within the required 10m buffer to a
NHS (in this case the Regional
floodplain).
The application was appealed because
the municipality did not make a decision
within the prescribed timeline.
The subject site at 85 Galloway Road in
the City of Toronto (Scarborough
Community Council Area) is located at
the northeast quadrant of Galloway
Road and the Canadian National
Railway Corridor, and is legally
described as Part of Lot 12,
Concession D, City of Toronto.
Within the Waterfront watershed and is
regulated by TRCA due to the presence
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
ro
Lays -El
Official Plan (OP)
Do not anticipate issues as long as they
address TRCA comments.
Prehearing not yet scheduled.
May require participant status.
Do not anticipate issues as long as they
address TRCA comments.
TRCA staff worked with applicant to
address floodplain issues (backwater).
Prehearing not yet scheduled.
May require Participant Status.
A Pre -Hearing Conference meeting
was been scheduled for June 12, 2017.
TRCA was granted Party Status.
Another Pre -Hearing Conference was
held November 22, 2017.
A new Pre -Hearing Conference has
been scheduled for October 1, 2018.
TRCA staff is open to establishing a
series of meetings if necessary in an
effort to work through the issues and
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
No.
File Information
Applicant and
Appellant(s)
Description of Application
Status
TRCA CFN:
of a wetland on the site.
come to a settlement prior to the
55313.04
The applicant is proposing a ZBA to
hearing.
facilitate the construction of five
detached and two semi-detached
dwellings serviced by a private
driveway.
The application was appealed to the
OMB by the applicant, because Council
has not made a decision within the
prescribed time period under the
Planning Act.
25.
Municipality:
Proponent and
The subject site at 1255 York Mills
A Pre -Hearing Conference was held on
City of Toronto (Scarborough
Appellant:
Road in the City of Toronto (North York
May 25, 2017, and TRCA was granted
Community Council Area)
Adventpath Ventures
Community Council Area) is located on
Party Status.
Inc.
the south side of York Mills Road and
A Hearing is set for two weeks starting
OMB File No.:
east of the Don Valley Parkway. The
Oct. 22, 2018.
PL160876
property is legally described as Part Lot
10, Concession 4, Plan 66R-21885.
TRCA Staff Contact:
Within the Don River watershed and is
Steve Heuchert
regulated by TRCA as it is within the
valley corridor, contains the valley slope
TRCA CFN:
and contiguous vegetation.
55131.03
The property contains a
decommissioned Toronto Hydro
electrical transformer station. The
applicant is proposing an OPA and ZBA
to construct 11 new residential units
with new access roadway and servicing
from York Mills Road.
The application was appealed to the
OMB by the applicant because City
Council refused their application on July
12, 2016.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
City of Toronto (Scarborough
Community Council Area)
OMB File No.:
PL161134
TRCA Staff Contact:
Steve Heuchert
TRCA CFN:
52345.01 A, B & C
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
2418832 Ontario Inc.
and 2419732 Ontario
Inc.
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
The subject sites at 250 Lawrence
Avenue West and 219 Glengarry
Avenue in the City of Toronto (North
York Community Council Area) are
located on the north side of Lawrence
Avenue West and east of Avenue
Road. The property is legally described
as Lot 1037, Part Lots 1038, 1041,
1042 and Part Glen Garry Avenue,
Registered Plan 1537.
The site adjoins a remnant ravine
identified as the Douglas Greenbelt and
is within the Regulated Area of the Don
River watershed. The valley slope is
steep and contains a watercourse that
is identified as being part of the City's
"Bedford Glen Storm Sewer" that
ultimately connects to Burke Brook
downstream.
The properties contain a 3 -storey
medical office building with a large
surface parking lot and a 2.5 -storey
triplex building fronting onto Glengarry
Avenue. The applicant is proposing an
OPA and ZBA to construct a 12 -storey
residential condominium building with
3 -storeys of below grade parking, and
two semi-detached dwellings with walk-
out basement parking.
The applications were appealed to the
OMB by the applicant because City
Council failed to make a decision on the
applications within the required
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
•
r
Official Plan (OP)
A Pre -Hearing Conference was held on
May 25, 2017, and TRCA was granted
Party Status.
A Hearing has been scheduled for May
22, 2018.
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
27
City of Toronto (Scarborough
Community Council Area)
OMB File No.:
PL150240
TRCA Staff Contact:
Steve Heuchert
TRCA CFN:
47390.02
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Development Ltd.
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
The subject sites include various
properties within the City of Toronto
(Toronto and East York Community
Council Area) in the Lower Don SPA
along the Eastern Avenue corridor east
of the Don River. These include 462
Eastern Avenue (PL150240) and 21
Broadview Avenue, 459 Eastern
Avenue, 54 Logan Avenue, 21 Don
Roadway and 30 Booth Avenue, and
629-675 Eastern Avenue (all under
PL140860).
The sites are located within the Don
River watershed and are regulated by
TRCA due to the presence of a
floodplain on the sites.
The City of Toronto adopted OPA 231
which deals with Employment Lands
policies and applies to all of the sites.
The Ministry of Municipal Affairs
withheld the decision on those sites
located within the SPA due to their
jurisdiction over the decision as per the
Provincial Policy Statement.
The owner of 462 Eastern Avenue also
applied for a site specific OPA to
change the land use designation from
Employment to Mixed Use in order to
allow for the reuse of an old factory
building and the construction of
residential condominiums.
OPA 231 was appealed to the OMB by
over 170 landowners because they had
concerns with the policies and land use
designations approved by the City.
The owner of 462 Eastern Avenue
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
r•
r
Official Plan (OP)
TRCA staff is monitoring the Ministry of
Municipal Affairs' efforts to defend
ministerial jurisdiction over the
proposed land use and policy changes
within the SPA.
A Pre -Hearing Conference meeting
was held on November 14, 2016.
TRCA staff requested and received
Party Status which was confirmed in an
OMB Order issued December 6, 2016.
The OPA 231 appeals within the Lower
Don SPA were consolidated with the
site specific appeal of 462 Eastern
Avenue, and those appeals were
extracted out of the wider OPA 231
hearing.
TRCA has retained legal counsel and
they along with staff are currently
participating in meetings and providing
technical and planning advice in an
effort to resolve the jurisdictional
matter. Staff will work to ensure legal
costs will be minimized to the greatest
extent possible.
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
L i
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
not made a decision within the
prescribed time period under the
Planning Act.
The subject sites are located within a
Regional Storm Floodplain and within a
SPA. TRCA staff has concerns with
some of the site specific applications as
they may not meet the natural hazard
policies of the PPS.\
28.
Municipality:
Proponent and
The subject site at 20 Sandringham
TRCA staff will be requesting Party
City Of Toronto
Appellant:
Drive in the City of Toronto (North York
Status.
Janet Minas
Community Council Area) is located on
TRCA staff is meeting with the Agent
OMB Case No.:
the east side of Sandringham Drive.
prior to the OMB hearing.
PL170431
The property is legally described as
OMB Hearing is scheduled for January
Part Block A, Plan 2395
30, 2018.
TRCA Staff Contact:
Within the Don River watershed and is
Anna Lim and Mark Rapus
regulated by TRCA as it is within the
valley corridor, contains the valley slope
TRCA CFN:
and contiguous vegetation.
55120.02
The applicant is seeking to obtain
consent in order to sever the existing
residential lot.
City staff recommended refusal of the
application.
Subject property is partially located
within the erosion hazard.
The application was appealed to the
OMB by the applicant because the
Committee of Adjustment refused their
application on March 22, 2017.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
L i
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Ontario Municipal Board (OMB) Hearings 2018 — Requests for Authorization to Appear Before the OMB
APPEALS TO NEW OFFICIAL PLANS AND SECONDARY PLANS
Region of Peel
29.
Municipality:
Applicant:
On December 8, 2016, Region of Peel
A pre -hearing conference was held on
Town of Caledon
Region of Peel
Council adopted Regional OPA (ROPA)
September 25, 2017.
30, to expand the Bolton Rural Service
TRCA staff requested Party Status to
OMB Case No.:
Appellants:
Centre in order to accommodate
assist the Region of Peel with technical
PL170058
Bolton North Hill
planned Caledon and Region of Peel
environmental issues as per our
Landowners Group
growth to 2031; and create a Study
Memorandum of Understanding with
TRCA Staff Contact:
Inc.
Area Boundary surrounding the Bolton
the Region of Peel; and to protect our
Leilani Lee -Yates and Quentin
Rural Service Centre within which
interests related to natural heritage and
Hanchard
Bolton Option 3
additional growth for Bolton beyond the
natural hazards.
Landowners Group
2031 population target is anticipated to
Another pre -hearing conference is
TRCA CFN:
occur.
scheduled for March 9, 2017, and will
49137
Bolton Residential
The Town of Caledon, Ministry of
make a decision on the various Party
Option 4 & 5
Municipal Affairs and Housing (MMAH),
requests at that time.
Landowners Group
and several landowner groups
Inc.; and others
appealed to the OMB.
Official Plan Amendment (OPA)
Ontario Municipal Board (OMB)
Zoning By-law Amendment (ZBA)
Special Policy Area (SPA)
Draft Plan of Subdivision (DPS)
Provincially Significant Wetland
(PSW)
Official Plan (OP)
Stormwater Management (SWM)
Centralized File Number (CFN)
Section IV — Ontario Regulation 166/06, As Amended
RES.#6134/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the existing channel of a
river, creek, stream or watercourse, or for changing or interfering in any way with a
wetland;
b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic
beaches or pollution or the conservation of land may be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of the Authority, the
control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.
Moved by: Colleen Jordan
Seconded by: Jennifer Innis
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
the applications 10.1 — 10.2, which are listed below.
CARRIED
RES.#6135/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THAT a permit be granted in accordance with Ontario Regulation 166/06, as amended, for
application 10.9 which is listed below.
CARRIED
PERMIT APPLICATIONS 10.1 - 10.2 ARE MAJOR APPLICATIONS - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
• 6 •
TOWN OF AJAX
10.1 TOWN OF AJAX
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
interfere with a wetland and alter a watercourse on Lakeview Boulevard from Poplar
Avenue to Maple Avenue and within Paradise Park, in the Town of Ajax, Waterfront
Watershed as located on the property owned by the Toronto and Region Conservation
Authority and the Town of Ajax. The purpose is to revitalize Paradise Park by realigning
Lakeview Boulevard between Poplar Avenue and Maple Avenue within Paradise Park,
constructing two municipal parking lots, a washroom facility and associated water and
sanitary infrastructure, improve local park trail connections, construct a sand volleyball
court, construct two new playgrounds, a shade structure and watermains from Poplar
Avenue to 75 m east of Poplar Avenue and from 80 m west of Maple Avenue to Maple
Avenue.
CFN: 58432 - Application #: 1150/17/AJAX
Report Prepared by: Sharon Lingertat 5717 slingertat@trca.on.ca
For information contact: Sharon Lingertat 5717 slingertat@trca.on.ca
Date: January 29, 2018
TOWN OF CALEDON
10.2 19350 CENTREVILLE CREEK ROAD
To construct, reconstruct, erect or place a building or structure on Lot 1, 2, Concession
2, Lot 1, Concession 3 East Half Lot 37, Plan 43R-18424, 19350 Centreville Creek
Road, in the Town of Caledon, Humber River Watershed. The purpose is to recognize
the construction of a 6.09 m by 12.19 m (20 ft by 40 ft) above ground swimming pool at
the rear of an existing residential dwelling located within TRCA's Regulated Area of the
Humber River Watershed. The described works were initiated without the issuance of a
TRCA or municipal building permit. As such, an additional permit application fee of 100%
was charged for this "after -the -fact" permit.
CFN: 58750 - Application #: 1233/17/CAL
Report Prepared by: Andrea Terella 5657 andrea.terella@trca.on.ca
For information contact: Andrea Terella 5657 and rea.terella@trca.on.ca
Date: January 30, 2018
RES46136/17 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED — ERRATA APPLICATIONS
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for
applications 10.3 —10.7, inclusive, that had been scheduled on the agenda as errata
applications, for which all the required information was received and finalized.
CARRIED
697
PERMIT APPLICATIONS EX10.3 - EX10.7 MAJOR APPLICATIONS - ERRATA
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency works, resolution of violations/after the fact permits, trail construction.
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10.3 GOVERNING COUNCIL OF THE UNIVERSITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade and
temporarily or permanently place, dump or remove any material, originating on the site
or elsewhere on , (1265 Military Trail), in the City of Toronto (Scarborough Community
Council Area), Highland Creek Watershed as located on the property owned by
Governing Council of the University of Toronto. The purpose is to construct an asphalt
surface trail and three sections of elevated boardwalk on the upper valley slope adjacent
to the University of Toronto Scarborough Campus. A portion of the slope that is currently
over steepened will be engineered.
CFN: 58177 - Application #: 0779/171TOR
Report Prepared by: Mark Rapus 5259 mrapus@trca.on.ca
For information contact: Mark Rapus 5259 mrapus@trca.on.ca
Date: January 29, 2018
CITY OF VAUGHAN
10.4 MONARCH CASTLEPOINT KIPLING NORTH DEVELOPMENT LIMITED
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
interfere with a wetland and alter a watercourse on Lot 28, 29, Concession 8, (11178
Kipling Avenue), in the City of Vaughan, Humber River Watershed as located on the
property owned by Monarch Castlepoint Kipling North Development Limited. The
purpose is to allow development, interference with a wetland and the alteration of a
watercourse within a Regulated Area of the Humber River Watershed to facilitate the
construction of a stormwater management facility (SWM Pond 2) and associated outfall
to service a portion of Block 55 East, northwest of Kipling Avenue and Teston Road, in
the City of Vaughan.
CFN: 58938 - Application #: 1353117NAUG
Report Prepared by: Polina Barn 5256 polina.bam@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: January 29, 2018
50110160
CITY OF VAUGHAN
10.5 NASHVILLE DEVELOPMENTS INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Lot 24, Concession 9,
(Major Mackenzie Drive and Huntington Road), in the City of Vaughan, Humber River
Watershed as located on the property owned by Nashville Developments Inc. The
purpose is to allow development and the alteration of a watercourse within a Regulated
Area of the Humber River Watershed to facilitate topsoil stripping and the installation of
sediment and erosion control measures in Phase 4B of a draft approved plan of
subdivision (19T -15V006) within Block 61 West, northeast of Major Mackenzie Drive and
Huntington Road, in the City of Vaughan.
CFN: 58976 - Application #: 1392117NAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: January 30, 2018
CITY OF VAUGHAN
10.6 NASHVILLE DEVELOPMENTS INC.
To site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and alter a watercourse on Lot 24, Concession 9,
(Major Mackenzie Drive and Huntington Road), in the City of Vaughan, Humber River
Watershed as located on the property owned by Nashville Developments Inc. The
purpose is to allow development and the alteration of a watercourse within a Regulated
Area of the Humber River Watershed to facilitate topsoil stripping and the installation of
sediment and erosion control measures in Phase 2 of a draft approved plan of
subdivision (19T -16V010) also known as the Mizuno lands within Block 61 West,
northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.
CFN: 58977 - Application #: 1394/17NAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Coreena Smith 5269 csmith@trca.on.ca
Date: January 30, 2018
CITY OF VAUGHAN
10.7 RAVINES OF ISLINGTON ENCORE INC.
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere
and alter a watercourse on Lot 8, 9, 10, 11, 12, Plan M-1113, (8451 - 8457 Islington
Avenue), in the City of Vaughan, Humber River Watershed as located on the property
owned by Ravines of Islington Encore Inc. The purpose is to allow development and the
alteration of a watercourse within a Regulated Area of the Humber River Watershed to
facilitate the construction of 36 townhouse units in 6 blocks with a single driveway,
above ground parking, stormwater outfall upgrades, servicing, decks, patios, retaining
walls and other landscaping features at 8451 - 8457 Islington Avenue, in the City of
Vaughan.
• • •
CFN: 58855 - Application #: 1334/17/VAUG
Report Prepared by: Coreena Smith 5269 csmith@trca.on.ca
For information contact: Carolyn Woodland 5214 cwoodland@trca.on.ca
Date: January 30, 2018
RES.#6137/17 - STANDARD DELEGATED PERMITS
Moved by: Glenn De Baeremaeker
Seconded by: Vincent Crisanti
THAT standard delegated permits, permission for routine infrastructure works, and minor
works letter of approval granted by Toronto and Region Conservation Authority staff, in
accordance with Ontario Regulation 166/06, as amended, which are listed below, be
received.
CARRIED
10.8 STANDARD DELEGATED PERMITS
Standard Permits, including Emergency Infrastructure Works permissions, are implemented by
Planning and Development Division staff and are received monthly by the Executive Committee.
Standard Permits , including Emergency Infrastructure Works permissions, are subject to the
authorization of designated staff appointed as Enforcement Officers, as per Authority
Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency
infrastructure works are non-complex permissions consistent with TRCA approved policies and
procedures and issued for a time period of two years or less.
CITY OF MARKHAM
CITY OF MARKHAM - Rouge River Watershed
The purpose is to remove an existing 900 mm Corrugated Steel Pipe (CSP) culvert and
construct an open swale, relocate an existing golf course path and construct a new 900 mm
High Density Polyethylene (HDPE) pipe outfall, at 120 Rouge Bank Drive, on the Markham
Green Golf Course, north of 14th Avenue, in the City of Markham, Rouge River Watershed, on
property owned by the City of Markham. Works will be conducted in the dry and a warm water
construction timing window applies.
CFN: 56839 - Application #: 0097/17/MARK
Report Prepared by: Christine Furtado, extension 5310, email cfurtado@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: January 10, 2018
CITY OF MARKHAM - Rouge River Watershed
The purpose is to rehabilitate and cleanout an online stormwater management pond (Pond # 1)
located south of Apple Creek Boulevard near Rodick Road, in the City of Markham. The Ministry
of Natural Resources and Forestry (MNRF) Redside dace fisheries timing window will apply to
this project unless otherwise specified in writing by MNRF.
700
CFN: 57861 - Application #: 0736/17/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: January 19, 2018
ENBRIDGE GAS DISTRIBUTION INC. - Don River Watershed
The purpose is to remediate an exposed gas pipeline. The warmwater construction timing
window applies to this project.
CFN: 53660 - Application #: 0356/15/MARK
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: December 19, 2017
9 GLENBOURE PARK DRIVE - Rouge River Watershed
The purpose is to conduct minor grading works and install a PVC pipe for stormwater drainage
within a Regulated Area of the Rouge River watershed at 9 Glenbourne Park Drive in the City of
Markham.
CFN: 58597 - Application #: 1135/17/MARK
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: September 20, 2017
YORK REGIONAL CONDOMINIUM CORPORATION NO. 792 C/O DEL PROPERTY
MANAGEMENT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate asphalt resurfacing and paver replacements on the subject property.
CFN: 59150 - Application #: 0022/18/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: January 11, 2018
CITY OF MISSISSAUGA
PANATTONI DEVELOPMENT COMPANY - Etobicoke Creek Watershed
The purpose is to install a sanitary sewer connection from 2020 Logistics Drive to an existing
sanitary trunk sewer located along Etobicoke Creek, in the City of Mississauga. No in -water
work is associated with this project.
CFN: 58897 - Application #: 1462/17/MISS
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: January 22, 2018
701
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
47 KINGSWAY CRESCENT - Humber River Watershed
The purpose is to construct a partial second storey addition to the existing two storey single
family dwelling at 47 Kingsway Crescent in the City of Toronto (Etobicoke York Community
Council Area).
CFN: 58945 - Application #: 1360/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 11, 2018
9 EASSON AVENUE - Humber River Watershed
The purpose is to construct a third storey addition over the existing footprint at 9 Easson
Avenue in the City of Toronto (Etobicoke York Community Council Area). The proposal
also includes a rear deck and front porch.
CFN: 58930 - Application #: 1363/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 25, 2018
262 ELLIS AVENUE - Humber River Watershed
The purpose is to construct a replacement deck to the rear of the existing single family dwelling
at 262 Ellis Avenue in the City of Toronto (Etobicoke York Community Council Area).
CFN: 58975 - Application #: 1396/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 8, 2018
49 BERL AVENUE - Mimico Creek Watershed
The purpose is to construct a partial second storey addition, rear verandah, attached carport,
and ground floor (front and side) additions to the existing single storey detached dwelling at 49
Berl Avenue in the City of Toronto (Etobicoke York). Included in this proposal is a replacement
retaining wall located towards the rear of the property.
CFN: 57752 - Application #: 0451/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 11, 2018
100 SOUTH KINGSWAY - Humber River Watershed
The purpose is to construct a ground floor addition, car port, and second storey addition to the
existing single storey dwelling at 100 South Kingsway in the City of Toronto (Etobicoke York).
702
CFN: 57405 - Application #: 0174/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 9, 2018
27 FABIAN PLACE - Humber River Watershed
The purpose is to construct a new two storey single family detached dwelling at 27 Fabian Place
in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be
demolished.
CFN: 57395 - Application #: 0163/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 2, 2018
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
DONALDA CLUB - Don River Watershed
The purpose is to demolish and reconstruct an existing irrigation pump house structure and the
replacement of an existing irrigation pond intake and wet well structure at 12 Bushbury Drive
also known as the Donalda Club in the City of Toronto (North York Community Council Area).
CFN: 58853 - Application #: 1321/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 16, 2018
16 MAY TREE ROAD - Don River Watershed
The purpose is to construct a pool and deck on the third floor of the existing single family
dwelling at 16 May Tree Road in the City of Toronto (North York Community Council Area).
CFN: 55351 - Application #: 0076/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 9, 2018
33 PLYMBRIDGE CRESCENT - Don River Watershed
The purpose is to construct a one storey rear addition to an existing two storey single family
dwelling located at 33 Plymbridge Crescent in the City of Toronto (North York Community
Council Area).
CFN: 58850 - Application #: 1297/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 17, 2018
703
50 HI MOUNT DRIVE - Don River Watershed
The purpose is to construct a new two-storey single family detached dwelling at 50 Hi Mount
Drive in the City of Toronto (North York Community Council Area).
CFN: 55892 - Application #: 0468/161TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 8, 2018
23 GREEN VALLEY ROAD - Don River Watershed
The purpose is to construct a replacement dwelling with attached rear deck, inground pool with
associated hardscaping, and front yard landscaping at 23 Green Valley Road, in the City of
Toronto (North York Community Council Area).
CFN: 57757 - Application #: 1448/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 11, 2018
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
108 VICTORIA PARK AVENUE - Waterfront Watershed
The purpose is to construct two replacement decks and landscaping to the rear of the existing
single family dwelling at 108 Victoria Park Avenue in the City of Toronto (Scarborough
Community Council Area).
CFN: 57036 - Application #: 1275/16/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 26, 2018
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
130 BOOTH AVENUE - Don River Watershed
The purpose is to construct a rear two storey addition to the existing three storey semi-detached
dwelling at 130 Booth Avenue in the City of Toronto (Toronto and East York Community Council
Area). The proposal also includes a rear deck and roof for the front patio.
CFN: 58536 - Application #: 1067/17/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 8, 2018
704
101 MORSE STREET -Waterfront Watershed
The purpose is to construct a two storey addition with deck above, an attached deck to the rear,
basement extension with associated walkout, and proposed detached garage at the rear lot line
of an existing two storey single family detached dwelling located at 101 Morse Street in the City
of Toronto (Toronto and East York Community Council Area).
CFN: 58112 - Application #: 0746/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Steve Heuchert, extension 5311, email sheuchert@trca.on.ca
Date: January 22, 2018
CITY OF VAUGHAN
2019625 ONTARIO LTD. - Don River Watershed
The purpose is to undertake minor grading works within TRCA's Regulated Area of the Don
River Watershed in order to facilitate the expansion of an existing gravel parking lot. The subject
property is located at the rear Sweetriver Boulevard in the City of Vaughan.
CFN: 58599 - Application #: 1133/171VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 10, 2018
2109179 ONTARIO LTD. - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River watershed, the
removal and restoration of an abandoned culvert and stream crossing on lands known
municipally as 3501 King -Vaughan Road, in the City of Vaughan.
CFN: 57491 - Application #: 0262/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: January 17, 2018
202 WOODLAND ACRES CRESCENT - Don River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River Watershed, the
development of a replacement single family dwelling with a footprint of 498 sq. m. (5263 sq. ft.),
a new septic system, and associated landscaping on lands known municipally as 202 Woodland
Acres Crescent, in the City of Vaughan.
CFN: 58772 - Application #: 1276/17/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 8, 2018
705
PINE VALLEY NORTH SPS LANDOWNER GROUP - Humber River Watershed
The purpose is to undertake installation of a watermain on Teston Road from Weston Road to
1610m west of Weston Road. In -water and near -water works are subject to the Redside Dace
timing window unless otherwise specified in writing by the Ministry of Natural Resources and
Forestry.
CFN: 58139 - Application #: 0822/17/VAUG
Report Prepared by: Scott Smith, extension 5758, email ssmith@trca.on.ca
For information contact: Scott Smith, extension 5758, email ssmith@trca.on.ca
Date: January 17, 2018
REGIONAL MUNICIPALITY OF YORK - Humber River Watershed
The purpose is to undertake relocation of bus stops and roadway widening to accommodate
relocated bus bays, associated right turn lanes and taper extensions at Jane Street and
Pennsylvania Avenue and Macintosh Boulevard in the City of Vaughan. The proposed works
also include conversion of existing stops to VIVA standards.
CFN: 54375 - Application #: 0787/15NAUG
Report Prepared by: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: January 3, 2018
TOWN OF CALEDON
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber
River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 719.2 sq. m (6,936 sq. ft.) residential
dwelling and septic system associated with a municipal building permit.
CFN: 58955 - Application #: 1403/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: January 17, 2018
DUNSIRE (MOUNT PLEASANT) INC. C/O DUNSIRE DEVELOPMENTS INC. - Humber River
Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 545 sq. m (5,866.19 sq. ft.) residential
dwelling and a septic system associated with a municipal building permit.
CFN: 58958 - Application #: 1401/17/CAL
Report Prepared by: Anant Patel, extension 5618, email apatel@trca.on.ca
For information contact: Anant Patel, extension 5618, email apatel@trca.on.ca
Date: January 17, 2018
706
TOWN OF CALEDON - Humber River Watershed
The purpose is to reconstruct Old Church Road, from Mount Pleasant Road to west of Highway
50, in the Town of Caledon. The warm water construction timing window applies to this project.
CFN: 57692 - Application #: 0569/17/CAL
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: January 05, 2018
TOWN OF RICHMOND HILL
8 BAYVIEW PARK LANE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 580.81 square metre two-storey single
family dwelling, associated with a municipal building permit.
CFN: 58959 - Application #: 1399/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: December 13, 2017
67 PEMBERTON ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a 4.8 m (16 ft) by 9.7 m (32 ft) in -ground pool and patio
located at the rear of an existing dwelling associated with a municipal building permit.
CFN: 58852 - Application #: 1322/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: January 4, 2018
IDEAL (JS) DEVELOPMENTS INC. - Rouge River Watershed
The purpose is to construct a townhome development, underground parking structure and
conduct associated grading works within a Regulated Area of the Rouge River watershed at 39,
53 and 67 Jefferson Sideroad in Town of Richmond Hill.
CFN: 58786 - Application #: 1299/17/RH
Report Prepared by: Anthony Sun, extension 5724, email asun@trca.on.ca
For information contact: Quentin Hanchard, extension 5324, email ghanchard@trca.on.ca
Date: December 19, 2017
YORK REGION RAPID TRANSIT CORPORATION - Rouge River Watershed
The purpose is to undertake Yonge Street widening between Bernard Avenue to Silverwood
Avenue. The works will include construction of a 4 m extension to the culvert outlet, placement
of fill to facilitate roadway construction and scour protection of the culvert inlet. The proposed
works are required to accommodate the road widening of Yonge Street and is associated with
the VIVA Bus Rapid Transit (BRT) project. The Ministry of Natural Resources and Forest
(MNRF) Redside dace timing window will apply to this project unless otherwise specified in
writing by MNRF.
707
CFN: 54501 - Application M 0879/151RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: January 4, 2018
TOWNSHIP OF ADJALA-TOSORONTIO
1225 CONCESSION ROAD 2 - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 6.7 m (22 ft) by 8.5 m (28 ft) drive shed to
the west and a 3.7 m (12 ft) by 6.1 m (20 ft) addition to the garage to the north of an existing
residential dwelling associated with a municipal building permit.
CFN: 58535 - Application M 1068/17/ADJ
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: January 19, 2018
TOWNSHIP OF KING
12699 JANE STREET - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a single family dwelling with a footprint of 344.5 sq. m. (3702 sq. ft.) on lands
known municipally as 12699 Jane Street, in the Township of King.
CFN: 59143 - Application M 1447/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 5, 2018
312 BURNS BOULEVARD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 459 sq. m. (4940.63 sq. ft.) replacement
single family dwelling, a 257 sq. m. (2766.32 sq. ft.) attached garage and a 60.5 sq. m. (651.21
sq. ft.) swimming pool associated with a municipal building permit. The subject property is
located on lands known municipally as 312 Burns Boulevard, in the Township of King.
CFN: 59154 - Application M 0021/18/KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 11, 2018
We
22 CRANBERRY LANE - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a replacement 215 sq. m. (2314.24 sq. ft.) garage and landscaping on lands
known municipally as 22 Cranberry Lane in the Township of King.
CFN: 59142 - Application #: 1449/17/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 5, 2018
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS
Permission for Routine Infrastructure Works Letter of Approval including Emergency
Infrastructure Works permissions are subject to authorization by staff designated as
Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and
emergency infrastructure works are located within a Regulated Area, generally within or
adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of
flooding, erosion, dynamic beaches, pollution or the conservation of land.
CITY OF BRAMPTON
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the south side of Morris Court, and into the property located at 24 Morris Court, in the City of
Brampton, Humber River Watershed, as located on property owned by the City of Brampton,
under Franchise Agreement with Enbridge Gas Distribution Inc., and on property owned by a
private landowner to whom Enbridge Gas Distribution Inc. is providing service at their request.
The purpose is to install a NPS 1 '/. PE IP gas service to a future residential building at 24
Morris Court, which was previously approved by TRCA in 2017 under Permit No. C-160952. No
in -water work is associated with this project.
CFN: 58643 - Application #: 1419/17/BRAM
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 18, 2018
CITY OF PICKERING
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway and on property located at 1952, 1956 and 1960 Woodview Avenue, in the City of
Pickering, Petticoat Creek Watershed as located on property owned by the City of Pickering
under Franchise Agreement with Enbridge Gas Distribution Inc. and on property owned by a
private landowner to whom Enbridge Gas Distribution Inc. is providing service at their request.
The purpose is to install a NPS 2 PE IP gas service for a future development located at 1952,
1956, and 1960 Woodview Avenue, which was previously approved by TRCA under Permit No.
C-171013. No in -water works are associated with this project.
709
CFN: 58645 - Application #: 1418/17/PICK
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 22, 2018
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and undertake sewer, watermain or
utility installation or maintenance within an existing roadway on Astoria Avenue, from Lambton
Avenue to Guestville Avenue, in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed as located on property owned by the City of Toronto. The purpose is
to undertake road resurfacing and watermain replacement. No in -water work is within the scope
of this project.
CFN: 58798 - Application #: 1433/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 12, 2018
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Kipling Avenue, south of Rowntree Road, in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed as located on property owned by the City of Toronto.
The purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 58804 - Application #: 1439/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 25, 2018
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on St. Dennis Drive and Linkwood Lane, located near Eglinton Avenue East and Don Mills
Road, in the City of Toronto (North York Community Council Area), Don River Watershed as
located on property owned by the City of Toronto. The purpose is to install conduit and a vault.
No in -water work is within the scope of this project.
CFN: 59177 - Application #: 0024/18/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 25, 2018
710
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Birchmount Road at St. Clair Avenue East, in the City of Toronto (Scarborough Community
Council Area), Don River Watershed as located on property owned by the City of Toronto. The
purpose is to undertake watermain replacements. The warm water construction timing window
of July 1 to March 31 will apply to this project.
CFN: 58797 - Application #: 0017/181TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 19, 2018
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Kennedy Road, north of Bonis Avenue, in the City of Toronto (Scarborough Community
Council Area), Highland Creek Watershed as located on property owned by the City of Toronto.
The purpose is to install conduit. No in -water work is within the scope of this project.
CFN: 57290 - Application #: 1290/17/TOR
Report Prepared by: Heather Wright, extension 5766, email hwright@trca.on.ca
For information contact: Heather Wright, extension 5766, email hwright@trca.on.ca
Date: January 26, 2018
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the north side of Eastern Avenue at Lewis Street, in the City of Toronto (Toronto and East
York Community Council Area), Don River Watershed as located on the property owned by the
City of Toronto, under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is
to conduct an integrity dig to inspect and complete necessary repairs on an existing pipeline.
Works will involve one excavation area at a decommissioned catch basin to expose the pipe. No
in -water works are within the scope of this project..
CFN: 58647 - Application #: 1416/17/TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 4, 2018
711
CITY OF VAUGHAN
CITY OF VAUGHAN
To undertake road/pathway resurfacing or reconstruction, sewer and watermain or utility
installation or maintenance within an existing roadway on Legion Court Road, in the City of
Vaughan, Humber River Watershed as located on property owned by the City of Vaughan. The
purpose is to is to undertake the reconstruction of Legion Court Road. The warm water
construction timing window applies to this project. A timing window extension has been granted.
CFN: 58449 - Application #: 1259/17NAUG
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: January 18, 2018
CITY OF VAUGHAN
To undertake road/pathway resurfacing or reconstruction, undertake sewer and watermain or
utility installation or maintenance within an existing roadway on Stegman's Mill Road, in the City
of Vaughan, Humber River Watershed as located on the property owned by City of Vaughan.
The purpose is to replace a watermain, reconstruct road surface, and upgrade existing street
lighting. The Redside Dace fisheries timing window applies to this project, unless otherwise
stated in writing by the Ministry of Natural Resources and Forestry (MNRF).
CFN: 58762 - Application #: 1327/17/VAUG
Report Prepared by: Tony To, extension 5798, email tto@trca.on.ca
For information contact: Tony To, extension 5798, email tto@trca.on.ca
Date: January 23, 2018
TRANSCANADA PIPELINES LTD.
To undertake structure maintenance on 11200 Weston Road, north of Teston Road, in the City
of Vaughan, Humber River Watershed as located on the property owned by TransCanada
Pipelines Limited (TCPL). The purpose is to undertake cathodic protection remediation works
on TransCanada's pipeline located at 11200 Weston Road. The proposed remediation works
are part of TransCanada's ongoing pipeline integrity program. Both open cut and horizontal
directional drilling methods will be used for the protection works. The works will be in
TransCanada's right-of-way (ROW).
CFN: 58646 - Application #: 1414/17/VAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: January 11, 2018
712
TOWN OF CALEDON
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
and on property located at 20 Sunshine Mountain Drive, in the Town of Caledon, Humber River
Watershed as located on the property owned by a private landowner to whom Enbridge Gas
Distribution Inc. is providing service at their request and on property owned by the Town of
Caledon under Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is to
install a NPS 1 PE IP gas main to service an existing residential dwelling at 20 Sunshine
Mountain Drive. No in -water work is associated with this project.
CFN: 58894 - Application #: 1444/17/CAL
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 22, 2018
TOWN OF CALEDON
To undertake road/pathway resurfacing or reconstruction and to undertake sewer, watermain or
utility installation or maintenance within an existing roadway on Healey Road, between The
Gore Road and Centreville Creek Road, in the Town of Caledon, Humber River Watershed as
located on property owned by the Town of Caledon. The purpose is to rehabilitate Healey
Road, from approximately 400 m east of Centreville Creek Road to approximately 500 m west of
The Gore Road, in the Town of Caledon. The Redside Dace construction timing window will
apply to this project unless otherwise specified in writing by the Ministry of Natural Resources
and Forestry (MNRF).
CFN: 57487 - Application #: 0378/171CAL
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: January 26, 2018
TOWN OF RICHMOND HILL
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 1600 Major Mackenzie Drive East, located approximately 260 m east of Leslie Street, west of
Via Renzo Drive in the Town of Richmond Hill, Rouge River Watershed as located on property
owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing service at
their request, and on property owned by the Town of Richmond Hill, under Franchise
Agreement with Enbridge Gas Distribution Inc. The purpose is to install a NPS 2 PE IP gas
header service to service a future development at 1600 Major Mackenzie Drive East, which was
previously approved by TRCA under Permit No. C-170296. No in -water works are associated
with this project.
CFN: 58644 - Application #: 1421/17/RH
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 8, 2018
713
TOWN OF RICHMOND HILL
To undertake sewer, watermain or utility installation or maintenance within an existing roadway,
undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Palmer Avenue and Cedar Avenue, in the Town of Richmond Hill, Don River Watershed as
located on property owned by the Town of Richmond Hill. The purpose is to undertake a
watermain replacement on Palmer Avenue, from the cul-de-sac of Palmer Avenue to Lennox
Avenue and on Cedar Avenue, from the north end of Fox Run Crescent to #275 Cedar Avenue.
Near water works are subject to the Cold Water Construction Timing Window.
CFN: 58146 - Application #: 0896/171RH
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: January 23, 2018
TOWN OF WHITCHURCH-STOUFFVILLE
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway at 8 Park Drive South, in the Town of Whitchurch-Stouffville, Duffins Creek Watershed
as located on the property owned by the Town of Whitch urch-StoufviIle. The purpose is to
undertake the construction of a Ground Level Box (GLB) and connect to an existing conduit.
There are no in -water or near -water works within the scope of this project.
CFN: 58763 - Application #: 1329/17/WS
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: January 16, 2018
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway at 6242 Main Street, in the Town of Whitch urch-StouffviIle, Duff ins Creek Watershed
as located on property owned by the Town of Whitch urch-StouffviIle with a permission to enter
through the landowner authorization. The purpose is to undertake the installation of a duct
connecting an existing manhole to an existing sub's duct. There are no in -water or near -water
works within the scope of this project.
CFN: 58903 - Application #: 0034/18NVS
Report Prepared by: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
For information contact: Shirin Varzgani, extension 5785, email svarzgani@trca.on.ca
Date: January 30, 2018
714
TOWNSHIP OF UXBRIDGE
ENBRIDGE GAS DISTRIBUTION INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Newton Reed Crescent, south of Goodwood Road and east of County Road 4, in the
Township of Uxbridge, Duffins Creek Watershed, as located on the property owned by the Town
of Uxbridge as per the Franchise Agreement with Enbridge Gas Distribution Inc. The purpose is
to install a NPS 4 PE IP gas main along Newton Reed Crescent within a new extension of a
subdivision known as Green Gables which was previously approved under Permit No. C-
171042. No in -water work is associated with this project.
CFN: 58442 - Application #: 1075/17/UXB
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: January 8, 2018
MINOR WORKS LETTER OF APPROVAL
Permission for Minor Works Letter of Approval are implemented by Planning and Development
Division staff and are received monthly by the Executive Committee. The permission of minor
works is subject to authorization by the Director, Planning and Development and signed by an
appointed enforcement officer. All minor works are located within a Regulated Area, outside of
the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
12 NAPERTON DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 6, 13, 14,
Plan M1839, 12 Naperton Drive, in the City of Brampton, Humber River Watershed.
CFN: 58882 - Application #: 1338/17/13RAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: January 16, 2018
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
25 BURROWS AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft), construct a ground
floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft)
and change the use, size, or number of dwelling units of a structure, or undertake work that
does not change the footprint of the existing structure on Lot 33, Plan 785, (25 Burrows
Avenue), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek
Watershed.
715
CFN: 59173 - Application #: 0027/18/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Anna Lim, extension 5284, email alim@trca.on.ca
Date: January 25, 2018
128 SATURN ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 2, Plan
4935Y, (128 Saturn Road), in the City of Toronto (Etobicoke York Community Council Area),
Etobicoke Creek Watershed.
CFN: 59214 - Application #: 0041/18/TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Anna Lim, extension 5284, email alim@trca.on.ca
Date: January 25, 2018
CITY OF VAUGHAN
16 ARNOLD AVENUE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 4, Plan
2132, (16 Arnold Avenue), in the City of Vaughan, Don River Watershed.
CFN: 59164 - Application #: 0008/18NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 16, 2018
188 VANDA DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (188 Vanda
Drive), in the City of Vaughan, Don River Watershed.
CFN: 59212 - Application #: 0032/18/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 18, 2018
TOWN OF CALEDON
76 GENTLE FOX DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 165, Plan
43M-1845, 76 Gentle Fox Drive, in the Town of Caledon, Etobicoke Creek Watershed.
CFN: 58954 - Application #: 1406/171CAL
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.on.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.on.ca
Date: January 29, 2018
716
TOWN OF RICHMOND HILL
61 COLLIN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (61 Collin
Court), in the Town of Richmond Hill, Don River Watershed.
CFN: 59160 - Application #: 1457/17/RH
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: January 9, 2018
TOWNSHIP OF KING
18 ASPEN KING COURT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part 9 Plan 65M-4169, (18
Aspen King Court), in the Township of King, Humber River Watershed.
CFN: 59138 - Application #: 1427/17/KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: January 17, 2018
14 ALEX CAMPBELL CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Part Lot 10 & 11, Block 1 & 2, Plan 65M-4276, (14 Alex
Campbell Crescent), in the Township of King, Humber River Watershed.
CFN: 59168 - Application #: 0011/18/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: January 10, 2018
14035 DUFFERIN STREET
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Part Lot 12, Concession 2, (14035 Dufferin Street), in the
Township of King, Humber River Watershed.
CFN: 59213 - Application #: 0046/18/KING
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: January 26, 2018
717
PERMIT APPLICATION 10.9 IS A MAJOR APPLICATION - REGULAR
Applications that involved a more complex suite of technical studies to demonstrate consistency
with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater
management ponds), extensive modifications to the landscape, major infrastructure projects,
emergency infrastructure works, resolution of violations/after the fact permits, trail construction.
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
10.9 CITY OF TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material, originating on the site or elsewhere,
and alter a watercourse, along Mimico Creek from Reid Manor Park to The Queensway
and Park Lawn Road, in the City of Toronto (Etobicoke York Community Council Area),
Mimico Creek Watershed, as located on property owned by the City of Toronto and
private landowners with temporary easements obtained. The purpose is to rehabilitate
an existing sanitary trunk sewer. Works will involve relining the trunk sewer and
construction of access routes to each maintenance chamber. The warm water
construction timing window of July 1 to March 31 will apply to this proposal.
CFN: 56796 - Application #: 0154/17/TOR
Report Prepared by: Daniel Brent 5774 dbrent@trca.on.ca
For information contact: Daniel Brent 5774 dbrent@trca.on.ca
Date: February 5, 2018
TERMINATION
ON MOTION, the meeting terminated at 9:57 a.m., on Friday, February 09, 2018.
Maria Augimeri
Chair
/ks
718
John MacKenzie
Secretary -Treasurer