Loading...
HomeMy WebLinkAboutG Ross Lord Dam EPP_FINAL - May 2018.pdf Emergency Preparedness Plan G. Ross Lord Dam Flood and Dam Breach 2018 -Final Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan ii DISCLAIMER This document was prepared by Toronto and Region Conservation Authority (TRCA) for managing emergency situations at TRCA owned dams. No part of this document is to be copied or transmitted without prior written permission of TRCA. This Emergency Preparedness Plan was developed to be used by external agencies and stakeholders during flood emergencies downstream of G. Ross Lord Dam. Distribution or use by other agencies or persons is strictly prohibited. TRCA disclaims any and all liability for any consequences which may have resulted from unauthorized reproduction, unauthorized use or improper use of this Dam Safety Emergency Preparedness Plan. This document contains confidential information and contact numbers of external stakeholders and emergency officials. Do not release this document, whole or in part, to any unauthorized outside persons or parties. Flood Inundation Maps can be found in Appendix A Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan iii List of Revisions Rev. No. Date Page No. Changed by Revision Details 1 June 2017 all TRCA Major overhaul to whole document & mapping 2 April 2018 all TRCA Document Finalized Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan iv Document Distribution This report/manual is distributed as follows. Updates and revisions to this document are to be incorporated into each of these noted copies. Copy Recipient Location #1 TRCA Files TRCA J:Drive #2 Manager – Flood Infrastructure and Hydrometrics Dam Operator (G. Ross Lord Dam) G. Ross Lord Dam #3 TRCA Flood Duty Officers FDO Laptop/Flashdrive #4 TRCA Chief Flood Duty Officer Flood Management Office (EOC), TRCA Head Office #5 Dam Operator (Claireville) Claireville Dam #6 Toronto Office of Emergency Management 703 Don Mills Road #7 Go Transit #8 Toronto Police #9 Toronto Fire Services #10 Toronto Transit Commission Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan v Table of Contents 1. Introduction ........................................................................................................................................... 5 1.1 Purpose ......................................................................................................................................... 5 1.2 G. Ross Lord Dam ........................................................................................................................ 7 1.2.1 Description .......................................................................................................................... 7 1.2.2 Access ................................................................................................................................. 7 1.3 Emergency Conditions .................................................................................................................. 8 1.3.1 Dam Breach / Possible Dam Breach .................................................................................. 8 1.3.2 Flood with Operations ......................................................................................................... 8 1.4 Downstream Flood Vulnerability ................................................................................................... 8 1.4.1 Hazard Potential .................................................................................................................. 9 1.4.2 Flood Vulnerable Locations ................................................................................................ 9 1.5 Flood Wave Travel Time ............................................................................................................. 11 2. TRCA Contacts ................................................................................................................................... 12 2.1 TRCA Roles and Responsibilities During a Flood and/or Dam Failure Emergency ................... 12 3. Inundation Maps and Zone Classification ....................................................................................... 15 4. Communications Equipment ............................................................................................................ 16 5. Public and Inter-Agency Notification ............................................................................................... 16 List of Tables Table 1-1: Emergency Contact List .............................................................................................................. 1 Table 1-2: Flood Vulnerable Crossings During Zone 3 Emergency ............................................................ 9 Table 1-3: Flood Wave Travel Times ......................................................................................................... 11 Table 3-1: Inundation Map Description ...................................................................................................... 16 List of Figures Figure 1-1 NOTIFICATION PROCEDURES FOR G. ROSS LORD DAM FOR FLOODING CAUSED BY DAM OPERATIONS ...................................................................................................................................... 3 Figure 1-2 NOTIFICATION PROCEDURES FOR G. ROSS LORD DAM BREACH EMERGENCY ........... 4 Figure 1-3: Location of G. Ross Lord Dam .................................................................................................. 6 Figure 2-1: TRCA Incident Management System (IMS) for Major Flood Events and Dam Failure ............ 13 List of Appendices Appendix A: G. Ross Lord Dam Inundation Maps ...................................................................................... 18 Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 1 Table 1-1: TRCA Emergency Contact List No. Position Name Telephone Alternate TRCA 1 TRCA FDO On-Call 24/7 Mobile Telephone 416 319-9538 2 TRCA Flood Line 416-661-6514 3 Metronet Radio Call Sign: Conservation Authority Note: The list in the above table shall be reviewed/updated annually by TRCA staff to reflect the changes in TRCA and any changes distributed as a document revision to all recognized document holders Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 3 Figure 1-1 NOTIFICATION PROCEDURES FOR FLOODING CAUSED BY DAM OPERATIONS K Alternate FDO or Other TRCA Technical Staff: To provide technical information to TPOC as requested Flood event already occurring, possible dam operations required FDO: Call 911 and Toronto Police Public Safety Unit - inform of EPP activation, identify impacted zone, recommend evacuation FDO: Call City of Toronto OEM – Inform about EPP Activation and identify impacted zone, recommend evacuation CFDO: Call Provincial Emergency Operations Centre (PEOC), to trigger Alert Ready message to public (if necessary) CFDO: Activate EOC and populate IMS structure for incident and contact required staff support CFDO: Send representative to City of Toronto OEM (can be PRL Officer) City of Toronto Office of Emergency Management (OEM): Contact EMWG Agencies with Rapid Notify or alternate call-out system. Contacted City divisions and infrastructure operators include: •TTC •GO Transit/Metrolinx •Toronto Police •Fire •Toronto Transportation •Toronto Water •Emergency Management Ontario Toronto Police: Implement evacuation as per Evacuation Emergency Support Function CFDO: Call MNRF Emergency Response Centre & Surface Water Monitoring Centre (SWMC) FDO: With the CFDO, calculate current or potential future dam operations, and resulting flow at Knightswood gauge CFDO: Direct Dam Operator to operate dam when thresholds reached Dam Operator: Call Forest Valley School Dam Operator: Update Dam Safety Code and report back to CFDO about operation FDO: Update/create Flood Warning message & issue via web, e-mail, and Twitter. Include map if applicable Resultant K-wood Flow > 55m3 ACTIVATE DAM EPP N Y CFDO: Confirm/Approve dam operation and resulting flow Dam Operator: Operate dam and follow corresponding procedures as per Dam OMS Manual TRCA PRL Officer: Represent TRCA at municipal EOC; Send situation report to internal staff and; Respond to media inquiries FDO: Continue to support and maintain IMS roles and functions as appropriate FDO: Call TPOC and OEM to advise that dam has been operated Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 4 Figure 1-2 NOTIFICATION PROCEDURES FOR FLOODING CAUSED BY DAM BREACH EMERGENCY TRCA Logistics Chief: Assist in procuring materials required to stabilize Dam Dam Operator: Call Forest Valley TRCA PRL Officer: Represent TRCA at municipal EOC; Send situation report to internal staff and; Respond to media inquiries Dam Operator: Call Manager, Flood Infrastructure FDO: Continue to follow Major Event Operational Procedures FDO: Continue to support and maintain IMS roles and functions as appropriate Dam Operator: Update Dam Safety Code and follow corresponding procedures as per Dam OMS Manual Dam Operator: Call 911 and Toronto Police Public Safety Unit – Inform about EPP Activation and identify impacted zone, recommend evacuation Dam Operator: Call Flood Duty Officer (FDO) FDO: Call Chief Flood Duty Officer (CFDO) FDO: Call City of Toronto OEM – Inform about EPP Activation and identify impacted zone, recommend evacuation CFDO: Call Provincial Emergency Operations Centre (PEOC), to trigger Alert Ready message to public (if necessary) CFDO: Activate TRCA EOC and populate IMS structure for incident and contact required staff support CFDO: Send representative to City of Toronto OEM (can be PRL Officer) City of Toronto Office of Emergency Management (OEM): Contact EMWG Agencies with Rapid Notify or alternate call-out system. Contacted City divisions and infrastructure operators include: •TTC •GO Transit/Metrolinx •Toronto Police •Fire •Toronto Transportation •Toronto Water •Emergency Management Ontario Toronto Police: Implement evacuation as per Evacuation Emergency Support Function Dam Operator: Identify condition of concern that would require EPP activation CFDO: Call MNRF Emergency Response Centre & Surface Water Monitoring Centre (SWMC) FDO: Update/create a Flood Warning message & issue via web, e-mail, and Twitter. Include map if applicable Manager, Flood Infrastructure / TRCA Operations Chief: Call MNRF Aurora District Regional Office ACTIVATE DAM EPP Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 5 1. Introduction G. Ross Lord Dam is located on the northeast corner of Finch Avenue West and Dufferin Street in the City of Toronto (Figure 1-1). The dam is owned by Toronto and Region Conservation Authority (TRCA) and was built to control flooding along the West Don River south from Finch Avenue to the East Don River at Don Mills Road. This Emergency Preparedness Plan (EPP) is a guide to assist personnel at TRCA and external emergency planners in developing response plans for a major flood and/or dam breach at the G Ross Lord Dam. The EPP includes specific information to allow timely response to flooding and breach events of the G. Ross Lord Dam. The EPP specifically addresses conditions downstream of the dam, generally how emergency responders will be notified of any emergency involving a large flood, potential and/or imminent dam breach. As part of an overall dam safety program that is being implemented by the TRCA, this EPP was prepared in conformity with the requirements of the Canadian Dam Safety Guidelines (2007). 1.1 Purpose The purpose of this EPP is to provide guidance to external stakeholders and response agencies affected by flood and dam breach emergencies at G. Ross Lord Dam. Information included in this document: • Description of emergency conditions that lead to activation of this EPP • Roles and responsibilities • Contact information • Flood inundation mapping depicting expected areas at risk This document was developed in partnership with the City of Toronto’s Office of Emergency Management (OEM) and other partner agencies. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 6 Figure 1-3 LOCATION OF G. ROSS LORD DAM Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 7 1.2 G. Ross Lord Dam 1.2.1 Description G. Ross Lord Dam was constructed in 1973 to provide flood control on the West Don River. The dam protects several communities downstream from smaller frequent flood events. G. Ross Lord Dam is an earthen embankment dam with concrete control structures constructed to control flooding in the West Don River. The Don River upstream of G. Ross Lord Dam has a drainage area of 67.3 km2. The reservoir has a storage of 550 000m3 corresponding to permanent pond level elevation 172.3 MASL (metres above sea level). With a crest height of 19.8m, the active flood storage at dam crest (182.88 MASL) is 5 060 000 m3. Maximum operating water level is 181.36 MASL. Spillway and outlet works consist of two low level gates, two mud valves and two radial emergency spillway gates. The two low level gates are used to control the water level above elevation 172.3 MASL. The two mud valves, located downstream of the inlet weir, are used to convey base flow through the dam while the low level gates are closed. This occurs at a capacity of 0.7m3/s. The two radial gates are used to control higher flows. Low Level Gates (2) • Sill elevation 166.4 MASL • Width 1.98 m • Height 1.98 m Radial (Spillway) Gates (2) • Sill elevation 174.348 MASL • Width 10.36 m • Height 8.5 m 1.2.2 Access Address: 700 Finch Ave West, Toronto, ON Closest Intersection: Dufferin St & Finch Ave W (Toronto, ON) UTM Coordinates: 17N 623827 4847641 G. Ross Lord Dam is located on the north side of Finch Avenue West, just east of Dufferin Street in Toronto, Ontario. Main access to the dam is from the north side of Finch Avenue West, just west of Wilmington Avenue. A secondary access entrance is off the west side of Bathurst Street, just south of Kenton Drive and travels along the Finch Corridor Recreational Trail. This access point should be considered Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 8 when heavy equipment too large to cross the crest bridge (maximum 25 tonnes) is required on the north embankment. TRCA staff should be on site to direct access of heavy equipment. 1.3 Emergency Conditions 1.3.1 Dam Failure / Possible Dam Failure This emergency condition is an extremely urgent situation. If the dam has failed, a large volume of impounded water may have already been released downstream. The scale of the impact downstream depends on the reservoir elevation and storage at the time of the failure. A dam failure during sunny day conditions may be partially managed by rivers and channels running at base flow conditions. However, in some instances a sunny day dam failure may have higher risks as persons downstream will not be on heightened alert from flood/weather warnings or actual flood conditions. 1.3.2 Flood with Operations During a large rain event, to ensure the dam fulfils its function without overtopping (which causes failure), it may be necessary to operate the dam (open the gates) if the reservoir water level and rate of rise thresholds are reached. Opening the gates when downstream watercourses are running full could cause flooding. 1.4 Downstream Flood Vulnerability The Flood Inundation Maps in Appendix A depict flood vulnerable locations downstream of G. Ross Lord Dam and include residential homes, commercial properties, bridges, roads and other structures that could flood during a large storm event or dam failure scenario. Table 1-2 is a compilation of select bridges that may have water above the bridge deck at the depths indicated on the table during the unlikely event that the dam would fail with a full reservoir at the same time as maximum flooding. Other bridges not listed here may also be affected. It should be noted that any bridge that has water above the bridge deck should be considered impassible. Any bridges and roads within the inundation areas shown on the Flood Inundation Maps in Appendix A may or may not be flooded during activation of this EPP. Caution should be exercised by responding agencies during flood emergencies. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 9 Table 1-1: Flood Vulnerable Crossings During Zone 3 Emergency Location Maximum Water Elevation (m) Depth Above Bridge Deck (m) Finch Ave. Bridge 175.2 6.0 Bathurst St. Culvert 162.6 0.1 Don River Blvd. Bridge 151.3 3.02 Yonge St. Bridge 132.6 7.1 Plymbridge Rd. Bridge 127.4 1.87 Knightswood Rd. 124.1 6.2 Bayview Ave. Bridge 117.3 5.4 Downstream of Bayview Ave. 109.9 2.1 1.4.1 Hazard Potential Failure of G. Ross Lord Dam under flood conditions has the potential to result in loss of life and significant flood/property damages in the downstream reach. It is expected that during a Zone 3 emergency that there are 3000 persons at risk within the expected flooded area. See Section 3 for a description of the different zone emergencies. 1.4.2 Flood Vulnerable Locations There are several flood vulnerable locations on the Don River which may be impacted by flooding. A detailed description of each flood vulnerable community is given in the sections below. A summary table of water level thresholds and travel times is provided in Table 1-3, and Inundation Maps are available in Appendix A. 1.4.2.1 Don River Boulevard (Mapsheet 4) Don River Boulevard is located north of Sheppard Avenue and east of Bathurst Street (see Sheets 3 and 4 in Appendix A). Don River Boulevard off of Sheppard Avenue is the only access road to this community. It takes approximately 50 minutes for water released from G. Ross Lord Dam to reach this location. There is no gauge to monitor water levels at this location. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 10 1.4.2.2 Yonge and York Mills (Mapsheet 6, 7 and 8) Yonge and York Mills (also known as Hogg’s Hollow) is the most flood vulnerable community along the West Don River. Within this area, the first structures to flood are located at the eastern end of Knightswood Road. Donino Avenue off of Mill Street and Ivor Road from Yonge Street are the only access roads to this community (see Sheets 7 and 8 in Appendix A). The Knightswood stream gauge located by the east end of Knightswood Road provides water level readings in real time. The Rosedale Golf Club is located immediately downstream of Knightswood Road. 1.4.2.3 Bayview and Lawrence (Mapsheet 9) York University’s Glendon Campus, located south of Lawrence Avenue and east of Bayview Avenue, is located within the flood plain (see Sheet 9 in Appendix A). The flood plain map and hydraulic model indicate that some of the buildings on the York University Glendon Campus are in the 10 year flood plain. 1.4.2.4 Parklands (Mapsheet 10, 11) There are several parks located along the West Don River between Bayview Ave. and Eglinton Ave. These parks include Sunnybrook, Serena Gundy and Seaton Park. Trails, roads and parking lots in these areas would all be expected to be flooded. 1.4.2.5 Lower Don River (Mapsheet 12) The Lower Don River contains several flood vulnerable locations including Bayview Avenue, rail tracks, the Don Valley Parkway, Don Valley Brickworks and, under extremely severe floods, a large swath of the Port Lands and communities south of Eastern Avenue. Flooding starts at the Richmond Hill Go Line rail tracks with flows in excess of 70 m3/s. Flooding of Bayview Avenue starts with flows in excess of 88 m3/s. The travel time of flows released from G Ross Lord Dam to this location is 4.5 hours. Water levels at this location here are monitored using the TRCA’s Don River at Todmorden Mills gauge. There is a water level gauge and visual monitoring through video cameras at this location. Mapsheet 12 does not include zones. Inundation areas on Mapsheet 12 are based on the 10 year flow which provides a reasonable approximation of areas at risk from a dam emergency. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 11 1.5 Flood Wave Travel Time The flood wave travel time refers to the amount of time it takes for water released from a dam gate opening or dam failure, to travel from the dam to a particular area downstream. The 2012 G. Ross Lord Dam Safety Review determined flood wave travel times to several locations on the West Don River as seen in Table 1-3. Note that flood wave travel times may vary depending on watercourse conditions. Table 1-2: Flood Wave Travel Times Location Approximate travel time for flow from G. Ross Dam to Location Don River Blvd. 50 minutes Yonge St. and York Mills (Hoggs Hollow) 90 minutes Bayview and Lawrence 2 hours 35 minutes Bayview Extension directly by entrance to Evergreen Brick Works Estimated 4 hours 30 minutes CNR/Metrolinx tracks and Bayview Extension north of the Bloor St. on/off ramps from the DVP Estimated 4 hours 30 minutes DVP at Dundas St. Estimated 5 hours Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 12 2. TRCA Contacts The primary contact for flood emergencies for G. Ross Lord Dam is the on-call Flood Duty Officer (FDO). The FDO can be reached 24/7 at: 416-319-9538 Alternatively, non-emergency inquires can be made at 416-661-6514 and will be directed immediately to voicemail. Voicemails are checked on a regular basis, but in the case of an emergency please use the number 416-319-9538 as directed above. If both landline and mobile telephone communications are unavailable, TRCA can be contacted through the Metronet Radio System, using the call sign ‘Conservation Authority’. 2.1 TRCA Roles and Responsibilities During a Flood and/or Dam Failure Emergency Figure 2.1 below illustrates the Incident Management System (IMS) structure that TRCA will implement should its internal Emergency Operations Centre (EOC) be activated. The EOC could be active for a major flood event due to a significant storm or dam failure. The on-call Chief Flood Duty Officer (CFDO) with input from the on-call FDO will make the decision to activate the EOC. The IMS structure illustrated on Figure 2-1, shows the relevant positions for the EOC activation relating to a dam emergency. All positions would be filled during a significant flood event. However, the EOC may be activated and populated with designated TRCA staff who could be responsible for more than one IMS position. The responsibilities for each of the necessary roles during a potential or imminent dam failure are provided in the sections below. In the case of an emergency, TRCA’s primary role is to alert first responders to address the safety of residents in potentially affected areas. As such the first external point of contact is 9-1-1 to alert emergency services. 2.1.1 Command Section The Command Section will be responsible for carrying out the corporate objectives, strategies and tactics during a major flooding event through continued communications with municipalities, emergency responders and internal staff. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 13 Control Group: CEO & Directors - Senior & Associate Internal Emergency Operations Centre (EOC) Director: On-call Chief Flood Duty Officer (CFDO) Operations Chief: Manager of Flood Infrastructure Dam Operators Planning Chief: Current FDO Logistics Chief: Project Managment Office Finance & Admin Chief: Senior Manager -Corporate Records Risk Management Officer: Associate Director of Property & Risk Management Public Relations & Liason (PRL) Officer: Senior Engineer Flood Risk & Communications Figure 2-1 TRCA Incident Management System (IMS) for Major Flood Events and Dam Failure Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 14 2.1.2 Control Group The EOC Control Group will consist of TRCA’s Chief Executive Officer and applicable Senior and Associate Directors to provide strategic direction, if necessary. 2.1.3 Emergency Operations Centre Director The on-call CFDO will be the EOC Director and provide functional decision making for TRCA’s response to a flood emergency and consider the TRCA objectives, strategies, and tactics of managing the flood emergency. 2.1.4 Public Relations & Liaison Officer TRCA’s Senior Engineer of Flood Risk & Communications or designated alternate will be the Public Relations & Liaison Officer, and will assist in disseminating information to the public and external agencies 2.1.5 Risk Management Officer TRCA’s Associate Director of Property and Risk Management would be the Risk Management Officer. 2.1.6 Operations Section The Operations Section will be responsible for ensuring all equipment for flood forecasting and warning and infrastructure for flood protection are operational before and during a flood event. Some of the flood protection infrastructure includes G. Ross Lord and Claireville dams. The operations section also manages and maintains the flood forecasting and warning tools such as rain and stream gauges. 2.1.7 Operations Chief TRCA’s Manager - Flood Infrastructure will hold the role of Operations Chief. 2.1.8 Dam Operator TRCA Dam Operators and designated back up Dam Operators will maintain their roles during a potential and imminent dam failure and during flood events. 2.1.9 Planning Section The Planning Section will be responsible for collecting, evaluating, analyzing, and disseminating incident information. This includes the gathering of situational information that will be used for current and future planning activities. The on-call FDO would be the Planning Section Chief. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 15 2.1.10 Logistics Section The Logistics Section coordinates the provision of all resources. Major activities of this section include; obtaining, maintaining and accounting for essential personnel, equipment and supplies beyond those immediately accessible to Operations. 2.1.11 Finance and Administration Section The Finance and Administration Section provides financial and cost analysis support to an incident. Major activities of this section include; monitoring of sources of funding, tracking and reporting financial usage, tracking timesheets for incident personnel and equipment. 3. Inundation Maps and Zone Classification Inundation maps of the area downstream of the G. Ross Lord Dam can be found in Appendix A. These maps have three “Zones” which correspond to different size releases of water from G. Ross Lord Dam. Each zone delineates the expected area of flooding. NOTES: Zone Description TRCA will indicate which Zone can expect flooding during activation of this Emergency Preparedness Plan. Responding agencies should focus response on the Zone indicated by TRCA to maximize response effectiveness. Map Limitations The maps in Appendix A are based on hydraulic simulations using the best available technologies. Actual conditions may differ from conditions depicted on the maps. Areas of inundation may change due to debris blockages or other unpredictable flow conditions. All agencies must exercise caution when working within flood inundated areas as conditions can change rapidly. Areas at Risk Downstream of Mapsheet 11 The Flood Inundated Zones 1, 2 and 3 depicted on the maps in Appendix A are valid on the West Don River until Serena Gundy Park at Leslie St. and Eglinton Ave. Depending on the type of emergency, areas downstream of Serena Gundy may be at risk of flooding. Mapsheet 12 depicts areas at risk downstream of Serena Gundy to Lake Ontario. Most areas are parkland with trails and recreational facilities. TRCA will direct responding agencies if the flood emergency will impact areas in Mapsheet 12. Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 16 Table 3-1: Inundation Map Description Colour on Inundation Maps Description Zone 1 Red This area is adjacent to the river and the most likely to flood. During large flood flows this will be the first area to be inundated and represents the most likely inundation scenario. Zone 1 corresponds with a flow of approximately 215m3/s. Zone 2 Orange Zone 2 corresponds with dam operations resulting in flows between 215m3/s and 550m3/s. Zone 3 Yellow This is the area at risk from a dam breach at G. Ross Lord Dam. This represents the worst case scenario. NOTE: To determine inundation extents downstream of Serena Gundy Park, refer to Mapsheet 12. 4. Communications Equipment All mobile phones, direct phone lines and radios must be kept in proper working condition and available for use during an emergency. Mobile phones should be used as the primary means of communications during an emergency. Contact information is available in Table 1-1. Should cell phone communications fail during an emergency, TRCA will use the Metronet radio system for external communications with partners and stakeholders. The Metronet radio is located in TRCA’s Emergency Operations Centre and is monitored continuously while the EOC is activated. 5. Public and Inter-Agency Notification Public notification of a dam failure or dam operations exacerbating flooding would occur via TRCA’s current flood messaging protocol and, when applicable, through Ontario’s Office of the Fire Marshall and Emergency Management’s (OFMEM) Alert Ready system. The public notification process is as follows: • TRCA will post a flood warning message to its website, RSS feed, and Twitter accounts. At the same time, TRCA would issue, via e-mail and e-mail-to-SMS service, a flood warning message to municipal partners, school boards and the media, who in turn relay the message to the public and/or relevant individuals within their organizations. • If the dam failure threat is immediate and poses a severe risk to life, TRCA would contact the Provincial Emergency Operations Centre (PEOC) to trigger the issuance of a Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 17 pre-defined warning message via the Alert Ready system, which interrupts radio and television broadcasts with emergency messaging. • Notification of an evacuation order or potential evacuation order will be undertaken by the City of Toronto as described in the Toronto Emergency Response Plan and Evacuation Emergency Support Function under which Toronto Police Services is the lead. Inter-agency notification will follow the protocol identified in Figures 1-1 or 1-2. TRCA would call first responders, then contact the Toronto OEM, who would in turn use Rapid Notify or an alternate call-out system to alert the affected members of the City of Toronto Emergency Management Working Group (EMWG). Toronto and Region Conservation Authority – G. Ross Lord Dam Emergency Preparedness Plan 18 APPENDIX A G. Ross Lord Dam Inundation Maps G. Ross Lord Dam P U R D O N D R EL D E R ST TORRESDALE AVE B L U E F O R E S T D R D O L L E R Y C R T WIL MIN G T O N A VE I V A N N E L S O N D R R O B E R T H I C K S D R H E N R Y W E L S H D R CEDAR SP RIN G S G R O VE B A Y H A M P T O N C R T D U F F E RIN S T F I N C H A V E W 685685 685 685 685 685 172170 164 162 147 145 139137 143 171169 177 192194 109 150 115113 105 160156154 155 133 103101 149 157165 161 125 209211 193 205207201 197 185187189 740 181181 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 Sheet 1 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 2 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway O V E R B R O O K P L GODDARD ST H O V E S T CARSCADDENDR MAXWELL ST ELDER ST B E A V E R V A L L E Y R D T E R R A C E A V E D E L L B A N K R D CANDIS DR C O R E Y D A L E C R T B L U E F O R E S T D R A R T R E E V A D R P A N N A H I L L R D H O R S H A M A V E TORRESDALE AVE GOLDFINCHCRT ARNOTT AVE D E N M A R K C R E S D E N M A R K C R E S H E A R T H S T O N E C R E S H E A R T H S T O N E C R E S BATHURST STFINCH A V E W 60 60 60 60 60 6060 685 60 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 1 Sheet 2 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 3 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway DONRIVERBLVD F A R R E L L A V E ALONZO RD C O C K S F I E L D A V E B E T T Y A N N D R HOVE ST S E A R L E A V E C O D S E L L A V E F L O O K L A N E BRYANT ST CARSCADDEN DR E L L E R S L I E A V E B R I G H T O N A V E W A T E R L O O A V E HEATONST CANYON AVE A C T O N A V E B I T T E R O O T R D W I L D GINGERWAY WILDG I N G E R W A Y C HR I ST I NE C R E S S H E P P A R D A V E W BATHURST ST 7282 70 61 49 4547 43 74 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 2 Sheet 3 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 4 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway G W E N D O L E N C R E S C A M E R O N A V E BRENTWOODAVE RADINE RD P O Y N T Z A V E W E N T W O R T H A V E B O G E R T A V E F R A N K L I N A V E EASTON RD MYLESVIEW PL EDDFIELD AVE T I M B E R L A N E D R EVAN RD CANYON AVE RAOUL W A L L E N B E R G F L O R E N C E A V E D O N R I V E R B L V D D O N R I V E R B L V D J O H N S T O N A V E R O Y C R E S T A V E A U D U B O N C R T B U R N E T T A V E S H E P P A R D A V E W 4169 4169 4169 4169 50 56 52 5472 82 70 27 49 4547 43 41 74 39 29 37 33 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 3 Sheet 4 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 5 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway E A S T O N R D BASSANORD R A D I N E R D WALKERRD GWENDOLEN CRES F R A N K L I N A V E S A N D R I N G H A M D R S T U A R T A V E B O T H A M R D G W E N D O L E N A V E Y O N G E B L V D M A RC H W O O D D R H W Y 4 0 1 C O L L E C T O R C A M E R O N A V E S T U A R T A V E F R A N K L I N A V E W E S T G A T E B L V D H W Y 4 0 1 H W Y 4 0 1 C O L L E C T O R S T U A R T C R E S S T U A R T C R E S H W Y 4 0 1 H W Y 4 0 1 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 4 Sheet 5 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 6 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway YORK RID G E R D Y O N G E BLV D D E V E R E G D N S O L D Y O N G E S T H W Y 4 0 1 C O L L E C T O R SANDRINGHAM DR WILLIAM CARSON CRES H W Y 4 0 1 C O L L E C T O R H W Y 4 01 Y O R K R I D G E R D H W Y 401 C O LL E CT O R M A S O N B LV D O L D Y O R K M I L L S R D Y O N G E S T WILLIAM CARSON CRESHWY401COLLECTOR YONGE ST YONGE ST YONGE ST Y O R K M I L L S R D W I L S O N A V E W I L S O N A V E H W Y 4 0 1 H W Y 4 0 1 4100 4000 4000 4050 10 4021 25 7 4021 11 14 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 5 Sheet 6 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 7 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway M A Y T R E ERD E A S T V I E W C R E S Y O R K R I D G E R D C H L O E M IL L W A Y B R O O K F I E L D R D M I L L S T D O NIN O A V E D O N W O O D S D R D O N I N O C R T I V O R R D P L Y M B R I D G E R D B E E C H W O O D A V E MASON BLVD W I N T O N R D HEDGEWOOD RD D O N W O O D S L A N E G R E E N V A L L E Y R D K N I G H T S W O O D R D D O N W O O D SG R O V E HIGHLAND C R E S Y O R K V A L L E Y C R E S F O R E S T G L E N C R E S C A M P B E LL C R E S D O N W O O D S D R ST MARGARETS DR O L D Y O R K M I L L S R D P LY M B RID G E C R E S O L D Y O N G E S T Y O R K R I D G E RD Y O R K M I L L S R D Y O N G E S T Y O N G E S T 4000 3900 4000 1410 89 16 88 20 8 113 14 2 7 11 391 17 12 914 12 12 15 85 7 2 7 5 986 8 6 3 3 10 9 79 97 18 15 12 17 6 100 6 1 5 1 6 114 14 109113 8 84 77 79 10 5 6 5 16 1103 11 15 107 7 83 10 2 89 98 7 109 95 17 1 11 2 75 99 108 87 106104 979193 10 4021 25 3885 43 1 3 59 19 71 39 51 4 3 10 53 6 74 4 4634 9 37 32 27 11 18 4 1516 54 19 1214 17 43 106 8 1 21 8 49 3 8 17 20 16 16 26 7 12 2 25 9 86 22 10 12 45 27 3 38 52 69 69 56 14 14 10 1 65 28 10 33 6 8 6 2 190 81 40 44 2 4021 4034 29 15 30 2 46 14 67 9 41 1 88 55 57 31 67 3524 11 2 8280 64 53 73 30 26 43 7 41 49 29 5 11 15 40 51 5550 84 2 37 4 5 31 50 76 5 90 75 7 15 42 66 3865 33 77 78 14 71 34 7935 45 38 3865 3865 6 11 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 6 Sheet 7 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 8 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway M I L D E N H A L L R D R I V E R V I E W D R BRAESIDERD WINTON RD S N O W D O N A V E Y O R K V A L L E Y CRES G R E E N V A L L E Y R D B A Y V I E W R I D G E K N I G H T S W O O D R D D O N W O O D S D R ARJAYCRES BAYVIEW AVE 19013632283034363230342628 14 31 351901 16 20 19 22 24 113 14 7 11 3 11 17 25 24 15 30 2 9 29 31 3 37 10 9 15 22 12 17 100 66 3323 1 57 31 1 27 114 109 113 10 25 6 110 23 14 107 21 7 16 21 25 19 89 18 98 20 7 109 95 21 28 19 99 108 87 17 106104 97 9393 37 8 1210 81 75 7779 1901 1901 1901 26 26 1 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 7 Sheet 8 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 9 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway C H E D I N G T O N P L MILDENHALL RD ST AUBYNS C R E S LAWRENCEBAYVIEWSRAMPP E M B U RY AVE MILDENHALL RD AR J AY C R E S W O O D A V E PARK LANE CIR R O T H M E R E D R PARKLANECIR BAYVIEWNLAWRENCERAMP L A W R E N C E B A Y V I E W N R A M P V A L L E Y A N N A D R BAYVIEW WOOD B A Y V I E W A V E LAW R EN C E A V E E L A W R E N C E A V E E B A Y V I E W S L A W R E N C E R A M P 2275 411 411 2275 411 4112275 411 411 411 411 411411 A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 8 Sheet 9 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 1 0 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway HIGH P O I N T R D G L E N V A L E B L V D P A R K L A N E C I R R O Y A L O A K D R GLENORCHY RD S A I N T F I E L D A V E A R A Z P L S U N C R E S T D R S H A D Y O A K S C R E S A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 9 Sheet 10 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable M a t c h t o S h e e t 1 1 Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway D O N A V O N D R BRENTCLIF FE RD B R O A D W A Y A V E D I V A D A L E D R R Y K E R T C R E S K I L L D E E R C R E S K I L L D E E R C R E S THURSFIELDCRES E G L I N T O N A V E E L E S L I E S T E G L I N T O N A V E E A L L E N E X P Y H W Y 401 H W Y 4 0 1 ALLEN E X P Y W I L S O N AVE E G L I N T O N A V E E B A T H U R S T S T Y O R K M I L L S R D L A W R E N C E A V E W F I N C H A V E W S H E P P A R D A V E E D U F F E R I N S T B A Y V I E W A V E A V E N U E R D S H E P P A R D A V E W Y O N G E S T L E S L I E S T Sheet 1 Sheet 2 Sheet 3 Sheet 4 Sheet 5Sheet 6 Sheet 7 Sheet 8 Sheet 9 Sheet 10 Sheet 11 M a t c h t o S h e e t 1 0 Sheet 11 0 50 100 150 200 25025m Disclaimer The Data used to create this map was compiled from a variety sources & dates. The T.R.C.A. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact the T.R.C.A. GIS Department. (416) 661-6600. Data provided by OMNR is Copyright, Queen’s Printer for Ontario. Other data provided or used is copyright by their respective owners. Bridge - May be Impassable Emergency Preparedness Plan - G. Ross Lord Dam Break - Flood Inundation Map / Legend Building within Flood Inundated Zone Building Not Affected by Dam Emergency River Zone 1 Flood Inundation Zone Zone 2 Flood Inundation Zone Zone 3 Flood Inundation Zone Bridges and roads within flood inundation area may or may not be passable Local Road Major Road Highway £¢D V P SerenaGundy Park E.T.SeatonPark RichmondHill GOLineNorth TorontoWastewaterTreatment Plant(only floods inextreme events) Evergreen Brickworks(floods under morefrequent events) Richmond Hill GO Line(floods under morefrequent events) Bayview Extension(floods under morefrequent events) Don Valley Parkway(floods under morefrequent events) Spill area southof Queen Street(only floods inextreme events) Port Lands and Southof Eastern Spillarea (only floodsin extreme events) Regulatory Floodplain Mapsheet 12 - Downstream Impact Areas 0 500 1,000 1,500250Meters ´Disclaimer:The Data used to create this map was compiled from a variety of sources & dates. TRCA takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections anytime without notice. For further information about the data on this map, please contact the TRCA GIS Department, 416-661-6600. Data provided by OMNR is Copyright, Queen's Printer for Ontario.Other data provided or uised is copyright by their respective owners. Bridges and roads within flood inundation area may or may not be passable