Loading...
HomeMy WebLinkAboutExecutive #10/18 Kirby Road Extension 14-12-2018,IPVVAUGHAN SCHEDULE 9 Future Transportation Network Freeway (Provincial) — Major Arterial (Regional) Minor Arterial (36 m) Major Collector (26 m) Minor Collector (24 m proposed/23 m existing) Special Classification (Refer to Secondary Plans) Local Proposed New Road Link' GTA West Corridor' & Hwy. 427 extension o Interchange Improvements o New Interchanges 0 Grade Separation 0 Jog Elimination Future Hwy 400 Series Road Crossings Railway Areas subject to Secondary Plans Municipal Boundary 'Alignments are conceptual. 2 Alignments are conceptual and subject to an Environmental Assessment. 3 Alignment and Corridor are currently under consideration by the Province July 2015 tj zma-ozlsaaagEIS - aa.par(SEC uRED) -Ad, I, Ac,,naro" — m x File EER View Dondm Help create, a o [ F6 D, G Ir•I fitzx /� IR © -' �#. tear d© Tools Comment share �1 "al, • Moderate impact to PSW and Tpnriparian area — direct removal 11 ^ man of riparian vegetation; i _ ( Ivan, Significant impact to and direct mail will" i removal of woodlands which oM5E2 r' provide Significant Wildlife r Habitat for Species of Q i Conservation Concern and ,o" , '"bats — most amount of impact, m 7.13 ha, 1069 m; -�_ '% � / Significant impact to habitat i w �, "n � ,( _= I for Species at Risk; and saaaa Hdo, [1114, enun"a,r O Eeol09 III zn 1 1111a¢a(mn �p,e"M,ar=�y,,,(,<,m w.(Ia�e • iModerate impact to East --wtWatannsrawrtim Significant aetaom'M4 L_J Eanamwnaaaa..ca swxspKlalcrosem mragnomn Tecfinkal paparll IL '°'asap"' w'"" w"""��" Patterson Creek. iMm AJp[¢m laMS I—Jl nttMrWaMhn100m igy MA¢mitYCdoni¢SWx Ir"emr W"W Iend h10 m Q s«o,ana springs 0 Type hereto search M■ I ii; 11'- I 7 W�W LIDAR Hillshade ' g -i F t - 'a . � F 4 fir' R �s r �• - X r'I ' ``� 94a Toronto and Region Conservation Authority IGN,Ke tors. and Aw nNn Coordinate System: WGS 1984 Web Mercator Auxiliary Sphere Projection: Mercator Auxiliary Sphere W<�\1�>E Date: 2018-12-13 �%t*I g Author: Web AppBuilderfor ArcGIS 0 Legend Assessment Parcels- MNR High : 254 Low: 0 0.4 Klometers 0.8 Disclaimer: The Data used to create this map was compiled from a variety of sources & dates. The TRCA. takes no responsibility for errors or omissions in the data and retains the right to make changes & corrections at anytime without notice. For further information about the data on this map, please contact th a TRCA GIs Department (416) 661-6600. May not be reproduced without permission. This is not a plan of survey. Produced by Toronto and Region Conservation Authority under Licence with the Ministry of Natural Resources Orlhophoto -2011 First Base Solutions Queen's Printer for Onlano. Recommended TRCA Contact Points in the Municipal Class EA Planning Process Pre -Consultation Phase 1 Phase 2 Phase 3 Phase 4 Notify TRCA of project initiation via phone call, email or letter 1 Meet with TRCA & submit draft Requests for Proposals Issue Request for Proposals i Hire consultant Legend `Select solu confirm � Event Progression •••••••••••i Decision Path ■ Recommended Contact with TRCA Identify I i Submit draft 1 Project File 1] Submit Notice of Completion & final Project File Identify altemative design concepts for preferred solution It Evaluate preliminary alternative design concepts & select preliminary preferred design Submit Phase 3 Report & Technical Appendices Meet with TRCA (Optional Site Visit) 1 Submit Notice of P11 CC Host It/PCC 1 Select ed design Submit draft Environmental Study Report (ESR) & Technical Appendices Meet with TRCA, if required Submit Notice of Completion of final ESR & Technical Appendices Phase 5 Obtain regulatory approvals, tender, construct, & monitor Submit Notice of Commencement/ Initiation 1 Identify problem or opportunity 1 Meet with TRCA (Optional Site Visit) 1 Submit Notice of Public Information Centre (PIC)/ Public Consultation Centre (PCC) 1 Host PIC/PCC `Select solu confirm � Event Progression •••••••••••i Decision Path ■ Recommended Contact with TRCA Identify I i Submit draft 1 Project File 1] Submit Notice of Completion & final Project File Identify altemative design concepts for preferred solution It Evaluate preliminary alternative design concepts & select preliminary preferred design Submit Phase 3 Report & Technical Appendices Meet with TRCA (Optional Site Visit) 1 Submit Notice of P11 CC Host It/PCC 1 Select ed design Submit draft Environmental Study Report (ESR) & Technical Appendices Meet with TRCA, if required Submit Notice of Completion of final ESR & Technical Appendices Phase 5 Obtain regulatory approvals, tender, construct, & monitor