HomeMy WebLinkAboutAttachment 2 RevisionsAttachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Green cleaning services for
Swan Lake Centre
the Swan Lake Centre for
Allcare Maintenance
$20,747.00
Innovation and Conservation.
Services Inc.
Green cleaning services for
Restoration Services Centre
the Restoration Services
Allcare Maintenance
$26,316.00
Services Inc.
Centre.
Boyd Centre
Green cleaning services for
Allcare Maintenance
$34,150.00
the Boyd Centre.
Services Inc.
Engineering and design
Albion Hills Conservation Area
services for the pedestrian
AMTEC
$4,284.00
Lakeview Pedestrian Bridge
bridge replacement.
Engineering services for
111 Whitburn Crescent
development of channel and
AQUAFOR BEECH LIMITED
$650.00
slope stabilization detailed
designs.
Engineering services for
111 Whitburn Crescent
development of channel and
AQUAFOR BEECH LIMITED
$27,554.00
slope stabilization detailed
designs.
Upper Highland Creek at Ellesmere
Engineering servoces for multi -
use trail and bridge detailed
AQUAFOR BEECH LIMITED
$19,040.00
Pan Am Trail Connection
design.
Attachment 2 - Contract Revisions
Highest Ranked _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
TRCA 2016- 2018 Waste and
Waste and recycling Services
Canadian Waste
$56,347.00
Recycling
2016- 2018.
Management
Black Creek near 19 - 31 Ridge Point
Geotechnical engineering
Crescent Erosion Control and Slope
services to develop detailed
Central Earth Engineering
($5,910.00)
Stabilization Project
designs.
Engineering services for
Carruthers Creek Hydrology Update
modelling and stormwater
CIVICA INFRASTRUCTURE
$7,430.00
INC.
management assessment.
Engineering services for the
Rockcliffe SPA 2D Model and
development of a MIKE Flood
DHI WATER &
$8,928.00
Floodplain Mapping Update
2-dimensional hydraulic
ENVIROMENT, INC.
model.
Construction goods and
111 Whitburn Crescent Slope
sesrvices for the slope
Stabilization and Drainage
stablization and drainage
Dynex Construction
($684,221.00)
Improvement Project
imrpovements at 111 Jennifer
Whitburn Crescent
111 Whitburn Crescent Slope
Construction goods and
Stabilization and Drainage
sesrvices for slope stablization
ENVISION... SYNERGY
$6,780.00
Improvement Project
and drainage imrpovements.
Engineering services to
Pomona Creek Geomorphic
complete a geomorphic
assessment and develop
GHD Limited
$2,938.00
Assessment
conceptual and detailed
designs.
Attachment 2 - Contract Revisions
Highest Ranked _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Bercy Park - Class EA and Detailed
Engineering services for
development of conceptual
GRECK & ASSOCIATES LTD.
$2,070.00
Design
and detailed design.
Maitland Park Bank Stabilization
Development of two concept
GRECK & ASSOCIATES LTD.
$5,042.00
Project
designs and a detailed design.
Sun -Canadian Pipeline Bank
Engineering services for bank
GRECK & ASSOCIATES LTD.
$1,373.00
Rehabilitation Detailed Design
stabilization detailed design.
Flynn House Exhibit Design
Design of Flynn House exhibit.
GXCentrik Design Inc.
$14,605.00
Maitland Park Stream Restoration
Rental of a by-pass pumping
Hertz Equipment Rentals
$824.00
Project
system
Maitland Park Stream Restoration
Rental of a by-pass pumping
Hertz Equipment Rentals
$11,623.00
Project
system
Kennedy Valley Trail, South
Etobicoke Sherway Garden Trail &
Consulting and construction
Hobden Construction
services for design build of
$77,187.00
Valleywood Phase 2 Trail Bridge
Company Ltd.
trail bridge.
Project
Attachment 2 - Contract Revisions
Highest Ranked _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Region of Peel Vulnerability
Professional writing services
for executive summaries and
hutchinson environmental
($2,400.00)
Assessments
presentation.
Monthly and annual
RSC Clivus Multrum composting
maintenance services for the
Lamoureux Mechanical
$4,771.00
toilet system
Clivus composting toilets at
Ltd./Plumb Perfect
RSC.
Construction of 3.1km asphalt
East Don Trail Construction -Phase
trail, 1 boardwalk and 4
Metric Contracting
($22,018.00;
1
bridges.
Services Corporation
East Don Trail Construction -Phase
Construction of 4 bridges, 1boardwalk
Metric Contracting
and 3.1km of
($3,765,041.00)
2
asphalt trail.
Services Corporation
Patterson Creek Valley Erosion
Engineering services to
Palmer Environmental
develop erosion control
$1,538.00
Hazards
Consulting Group Inc.
detailed design.
Geomorphic assessment and
Wegenast Valley Erosion Control
development of detailed
Palmer Environmental
$8,400.00
Project
designs for bank
Consulting Group Inc.
improvements.
Brampton Humber Valley Lands
Engineering, geomorphic and
Palmer Environmental
(BHVL) William Hostrawser Valley
$3,346.00
Channel Realignment
design services.
Consulting Group Inc.
19
Attachment 2 - Contract Revisions
Highest Ranked _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Engineering services for
Chorley Park Switchback Trail
detailed design, costing and
R.V. ANDERSON
$421.00
Connection
construction administration.
ASSOCIATES LIMITED
Engineering services for
Chorley Park Switchback Trail
detailed design, costing and
R.V. ANDERSON
$29,400.00
Connection
ASSOCIATES LIMITED
construction administration.
Bolton Camp Hydro Assessment for
Electrical engineering services
Runge &Associates Inc.
$130.00
Phase 1 Redevelopment
for site assessment.
Bolton Camp Hydro Assessment for
Electrical engineering services
Runge &Associates Inc.
$750.00
Phase 1 Redevelopment
for site assessment.
Bolton Camp Hydro Assessment for
Electrical engineering services
Runge &Associates Inc.
$3,104.00
Phase 1 Redevelopment
for site assessment.
Bolton Camp Hydro Assessment for
Electrical engineering services
Runge &Associates Inc.
$3,300.00
Phase 1 Redevelopment
for site assessment.
Bolton Camp Hydro Assessment for
Electrical engineering services
Runge &Associates Inc.
$8,500.00
Phase 1 Redevelopment
for site assessment.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Various Stormwater Management
Bathymetric survey services.
Stantec
$14,100.00
Ponds
Window coverings for south
Restoration Services Centre
facing windows on main and
SUN SHADES OF CALEDON
$709.00
second floor.
Window coverings for south
Restoration Services Centre
facing windows on main and
SUN SHADES OF CALEDON
$870.00
second floor.
Consulting services for the
70 Main St S Erosion Control Project
development of conceptual
TERRAPROBE INC.
$7,495.00
designs and evaluation.
Mimico Creek behind 2 Kevi Lane
Geotechnical and structural
Slope Stabilization and Erosion
engineering services to
TERRAPROBE INC.
($6,245.00)
Control Project
prepare detailed designs.
Engineering services for the
development of a
2Dimensional hydraulic
model, geotechnical,
Bolton Berm Hydraulic Assessment
structural and fluvial
VALDOR ENGINEERING
$4,600.00
and Remediation Study
INC.
assessment, and the
development of remediation
plan and restoration
alternatives.
Geoenvironmental,
Downtown Brampton Flood
Geotechnical and
WSP
$17,400.00
Protection EA
Hydrogeological engineering
services.
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Septic pumpout services for
2024515 ONTARIO
Septic Services 2017
$44,784.00
western zone facilities.
LIMITED
Supply of concrete water
control structures for Tommy
TTP Cell 2 and Lakeview
Acton Precast
$7,175.00
Thompson Park and Lakeview
Waterfront Connection.
Supply of concrete water
control structures for Tommy
TTP Cell 2 and Lakeview
Acton Precast
$19,660.00
Thompson Park and Lakeview
Waterfront Connection.
Waterfront Projects Environmental
Laboratory analytical services.
AGAT LABORATORIES
$32,339.00
Monitoring Program
Rental of a three unit
washroom trailer to
AMPOT PORTABLE TOILETS
Restoration Services Centre
$14,648.00
supplement existing
INC.
washroom facilities.
Supply and Delivery of 6-8
Lakeview Waterfront Connection
Tonne Piece Armourstone
Atlantis Marine
$44,625.00
Project
with Flat Bottom and Top.
Supply and Delivery of 2-5
Lakeview Waterfront Connection
Tonne Piece Stackable
Atlantis Marine
$260,610.00
Project
Armourstone.
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Ontario Land Surveyor (OLS)
29 Jason Road, City of Toronto
services to complete legal
AVANTI SURVEYING INC.
$413.00
survey work.
Private locates for
Trees/Shrubs Plantings in Toronto
compensation plantings in a
park located on the southeast
CABLE MASTER INC.
$90.00
Public Park
corner of Islington Avenue and
Finch Avenue West.
Various Events at BCPV and
Rental of linen services for
Chair Decor
$24,776.00
Kortright Centre
various events.
Toronto Islands Sump Installation
Loader komats rental for 2
Cooper Equipment Rentals
$9,786.00
months.
Ltd.
Toronto Islands Sump Installation
Trench box 2 road plates.
Cooper Equipment RentalsLtd.
$3,830.00
Chorley Switchback Construction
Construction goods and
CSL GROUP LTD.
$4,727.00
Project
services for a trail connection.
Glen Haffy Conservation Area
Asphalt paving goods and
Diamond Earthworks Corp.
$19,824.00
services.
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Kenney Valley Trail, South
Etobicoke Sherway Garden Trail,
Labour, equipment and
Diamond Earthworks Corp.
($2,554.00)
and Valleywood Phase 2 Trail
materials for asphalt paving.
Improvement Project
Kenney Valley Trail, South
Etobicoke Sherway Garden Trail,
Labour, equipment and
Diamond Earthworks Corp.
$1,343.00
and Valleywood Phase 2 Trail
materials for asphalt paving.
Improvement Project
Wilket Creek Reach 2 Cross Section
Traffic control services for the
Direct Traffic Management
$7,450.00
18-47
Wilket Creek project.
St. Andrews Valley Golf Club
Supply, delivery, and
Rehabilitation and Bank
Dynex
$3,354.00
Stabilization Project.
installation of access mats.
Engineering services to
West Don River near Langstaff (P-
complete a geomorphic
Ecosystem Recovery Inc.
$2,251.00
128)
assessment and develop
conceputal designs.
Engineering services to
15 Bakerdale Road Erosion Control
complete a topographic
Ecosystem Recovery Inc.
$3,100.00
and Bank Stabilization
survey and develop detailed
designs.
Mimico Creek behind 19-25
Fluvial geomorphological peer
Ridgegate Crescent
review and design
Ecosystem Recovery Inc.
$5,527.00
recommendation.
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Ontario Land Surveyor (OLS)
12 -14 Appletree Court
services to complete a
ERTL SURVEYORS
$832.00
Surveyor's Real Property
Report (SRPR).
Supply and installation of
Various TRCA Construction Projects
various type of fencing at four
FG Fencing and General
$5,402.00
(4) construction projects.
Construction
Coatsworth Cut Channel
Channel maintenance
GALLON MARINE LTD
$4,422.00
Maintenance Dredging
dredging services.
Coatsworth Cut Channel
Channel maintenance
GALCON MARINE LTD
$5,337.00
Maintenance Dredging
dredging services.
Coatsworth Cut Channel
Channel maintenance
GALCON MARINE LTD
$6,668.00
Maintenance Dredging
dredging services.
Bluffers Park Channel Maintenance
Channel maintenance
GALLON MARINE LTD
$6,910.00
Dredging
dredging services.
Compaction testing services of
Martin Goodman Trail at Baselands
subgrade and base for a multi-
GHD Limited
$3,097.00
use asphalt trail.
10
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Engineering services to
East Don River near Bayview (1-145,
complete a geomorphic
GHD Limited
$3,589.OD
1-146)
assessment and develop
conceputal designs.
Engineering services to
East Don River near Bayview (1-145,
complete a geomorphic
GHD Limited
$4,600.00
1-146)
assessment and develop
conceputal designs.
Supply and Delivery of 0.4-0.8
Lakeview Waterfront Connection
Tonne Piece Non -Stackable
Glenn Windrem Trucking
$58,412.00
Project
Armourstone.
Lakeview Waterfront Connection
Supply and Delivery of 225mm
Glenn Windrem Trucking
$93,948.00
Project
450mm Rip -Rap.
Supply and Delivery of 3-5
Lakeview Waterfront Connection
Tonne Piece Non -Stackable
Glenn Windrem Trucking
$194,599.00
Project
Armourstone.
Lakeview Waterfront Connection
Supply and delivery of thirty
GO DEEP INTERNATIONAL
$7,S83.00
Project
(30) navigation lights.
INC.
Removal of Bathurst Glen
Bathurst Glen Clubhouse
clubhouse concrete apron and
Greenspace Landscaping &
$6,090.00
replacement with unit paving
Property Services Inc
and gardens.
11
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Spring 2018 Various Planting Sites
Supply and delivery of mulch
Gro-Bark(Ontario) Ltd.
$2,655.00
for various planting sites.
Construction goods and
Brookbanks Park
services for culvert outfall and
Hobden Construction
$1,400.00
bridge replacement.
Company
Construction goods and
Brookbanks Park
services for culvert outfall and
Hobden Construction
$3,758.00
bridge replacement.
Company
Construction goods and
Brookbanks Park
services for culvert outfall and
Hobden Construction
$4,123.00
bridge replacement.
Company
Construction goods and
Brookbanks Park
services for culvert outfall and
Hobden Construction
$29,190.00
Company
bridge replacement.
Construction goods and
Brookbanks Park
services for culvert outfall and
Hobden Construction
$29,606.00
bridge replacement.
Company
Pre CCN
INFRASTRUCTURE
Pomona Mills Washout
INTELLIGENCE SERVICES
$3,125.00
sPost-Construction
Investigation.
INC.
12
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
St. Andrew's Valley Golf Club
Pre and post construction
Infrastructure Intelligence
Sanitary Remediation and Bank
$920.00
Stabilization Project
CCTV investigation services.
Services Inc.
Ontario Land Surveyor (OLS)
services to complete a legal
87 Birch Avenue, Richmond Hill and
survey, Surveyor's Real
J.D. BARNES LIMITED
$2,842.00
70 Main Street South, Markham
Property Report (SRPR) and
stakeout of a property
boundary.
Terraseeding works for
Various 2018 Construction Projects
various upcoming 2018
J.Lipani Turf Group Ltd.
$6,122.00
construction projects in the
Greater Toronto Area.
Various Restoration Sites 2018
Supply and application of
LEUSCHNER'S LAWN
$22,398.00
herbicide.
LANDSCAPE
Boyd Centre - Fire
Assessment of fire alarm and
LRI Enginneering Ltd.
$57.00
Alarm/Suppression System
supression system.
Supply and installation of
Albion Hills Dam Decommissioning
poured concrete footing and
Metric Contracting
$46,230.00
pedestal walls for new culvert.
Services Corporation
Alfred Kuehne Phase 3 Project
6 Month portable office trailer
MOBILEASE RENTALS INC.
$1,525.00
rental.
13
Attachment 2 - Contract Revisions
Lowest Bid _
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Fence rental for Eastern
MODU-LOC FENCE
Eastern Beaches Silver Node
$3,628.00
Beaches Silver Node.
RENTALS
8 month rental of perimeter
MODU-LOC FENCE
Albion Hills Dam Decommissioning
$7,600.00
quick fence.
RENTALS
Private locates for the
Toronto Islands
installation of the
MultiView
$949.00
maintenance sump holes.
Private locates for the
Toronto Islands
installation of the
MultiView
$3,456.00
maintenance sump holes.
Rental of 17 timber mats 20
foot long x 4 foot wide x 1 foot
Northern Mat & Bridge
Black Creek Dam Dredging Project
$7,943.00
thick for a three month
Ltd. Partnership
duration
Supply of native seed mix for
Various 2018 Restoration Projects
stream bank stabilization and
OSC
$10,350.00
wetland restoration.
Wilket Creek Rehabilitation Project
Rental of a by-pass pumping
RAIN FOR RENT CANADA
$13,372.00
Reach 2
system.
ULC
14
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Wilket Creek Rehabilitation Project
Rental of a by-pass pumping
RAIN FOR RENT CANADA
$33,158.00
Reach 2
system.
ULC
Labour, equipment and
Albion Hills Conservation Area
material for septic system
Regcon
$1,262.00
upgrades.
Labour, equipment and
Albion Hills Conservation Area
material for septic system
Regcon
$7,797.00
upgrades.
DIY Home Retrofit Workshops
Deliver of DIY home retrofit
Sean Kelly, CEA
$2,100.00
workshops (or parties).
Reforestation Planter Roof
Fabrication of two roofs for
SKYWAY TRAILER SERVICE
$1,342.00
reforestation Planters.
LTD.
Humber River Between 1025
Scarlett Road and Cruickshank Park
Rental of 6' high construction
Super Save Group
$904.00
Erosion Control and Slope
fence.
Stabilization Project
Boyd Office Swing Gate
Gate repair services.
Superior Doors & Gate
$4,230.00
SystemsLtd/
15
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Inventory and Audit Rental Vehicle
Vehicle rental.
Thomas Solutions
$2,416.00
Greenspace Conservation Rental
Vehicle rental.
Thomas Solutions
$4,235.00
Vehicle
Indian Line Transformer Project
Electrical services to upgrade
Tiltran Power Services
$2,500.00
hydro.
Corporation
Indian Line Transformer Project
Electrical services to upgrade
Tiltran Power Services
$4,267.00
hydro.
Corporation
Indian Line Transformer Project
Electrical services to upgrade
Tiltran Power Services
$4,320.00
hydro.
Corporation
Indian Line Transformer Project
Electrical services to upgrade
Tiltran Power Services
$5,086.00
hydro.
Corporation
Indian Line Transformer Project
Electrical services to upgrade
Tiltran Power Services
$12,250.00
hydro.
Corporation
16
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Rental of a By -Pass Pump
Toromont Cat A Div of
Black Creek Dam Dredging Project
$29,826.00
System.
Toromont Indust. Ltd.
Restoration Monitoring Program
Rental of a Bomag 56" Smooth
UNITED RENTALS OF
$18,242.00
Various Projects
Drum Roller for 3 months.
CANADA, INC.
Restoration Monitoring Program
Rental of a Takeuchi TB280
UNITED RENTALS OF
$28,349.00
Various Projects
Mini Excavator.
CANADA, INC.
Rental of a Case 621 Loader for
Rental of a Case 621 Loader
UNITED RENTALS OF
$45,113.00
various Projects
for 3 months.
CANADA, INC.
Four wheeled bikes for use at
Tommy Thompson Park
Yes Surrey Bike Co.
$1,500.00
Tommy Thompson Park.
17
Attachment 2 - Contract Revisions
Not Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
11 Ton excavator rental for 4
Toronto Islands
a variety of existing IBM Notes
Coopers Rental
$7,410.00
weeks.
Preferred Source
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Maintenance and bug -fixes on
IBM Notes Applications
a variety of existing IBM Notes
APPVISION INC.
$13,041.00
applications.
Engineering services for Grey
Grey Abbey Ravine Channel and
Abbey Trail channel and slope
AQUAFOR BEECH LIMITED
$6,225.00
Slope Stabilization
stablization detailed design.
Engineering services for the
Dimensional Modeling Guideline
development of 2 Dimensional
DHI WATER &
$980.00
D
Document
(21)) Modeling Guidelines.
ENVIROMENT, INC.
LID Treatment Train Tool for
Development of hydrological
Golder Associates
$3,053.00
Ontario - Phase 2
modeling software.
Albion Hills Dam Decommissioning
Removal of contaminated soils
GROUND FORCE
$5,984.00
from Albion Hills work site.
ENVIRONMENTAL INC.
External third party advisory
Carruthers Creek Watershed Plan
services for peer review of
J. Kinkead Consulting
$25,000.00
technical reports.
Fn
Attachment 2 - Contract Revisions
Preferred Source
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
Ontario Land Surveyor (OLS)
services to complete a legal
87 Birch Avenue, Richmond Hill and
survey, Surveyor's Real
1D Barnes Inc.
$7,525.00
70 Main Street South, Markham
Property Report (SRPR) and
stakeout of a property
boundary.
York Region Nature Collaborative
Keynote speaker.
Juliet Robertson
($1,500.00)
Conference
Professional services to
BCPV Enabling Accessiblity App
develop content for the Black
Katie Bryski
$1,858.00
Creek Pioneer Village Enabling
Accessiblity Mobile App.
Patterson Creek Overall Benefit
Professional geomorphic
consulting services to develop
MATRIX SOLUTIONS INC.
$1,085.00
Design
detailed designs.
Modification to existing
workspace and additional
Restoration Services Centre
office furniture to
SCI INTERIORS LIMITED
$177.00
accommodate Eastville staff
and expansion of the Forestry
group.
14 Azalea Court Slope Stabilization
Detailed design of slope
TERRAPROBE INC.
$320.00
Project
stabilization works.
Grey Abbey Ravine Municipal
Geotechnical engineering
Stormwater Infrastructure Repair
services for development of
TERRAPROBE INC.
$765.00
and Slope Stabilization Project
design.
19
Attachment 2 - Contract Revisions
Preferred Source
Project Name
Goods/Services Procured
:Awarded Bidder
Revision Cost
12-14 Appletree Court Slope
Engineering services for
TERRAPROBE INC.
$1,860.00
Stabilization
support during construction.
12-14Appletree Court Slope
Engineering services for
TERRAPROBEINC.
$2,000.00
Stabilization
support during construction.
20
Attachment 2 - Contract Revisions
Sole Source
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
($2,590,639.00)
The supply and installation of
BCPV Replacement Alarm System
a replacement alarm system
CHUBB EDWARDS, UTC
$168.00
for Sawyers House, Sawmill
FIRE & SECURITY CAN INC.
Erosion and Sediment Control
and Driveshed.
$760.00
The supply and installation of
Hanes GeoComponents
BCPV Replacement Alarm System
a replacement alarm system
CHUBB EDWARDS, UTC
$370.00
materials.
FIRE & SECURITY CAN INC.
Dyed Diesel Fuel Supply and
for Agnew House.
Vendor of Record M
Project Name
Goods/Services Procured
Awarded Bidder
Revision Cost
($2,590,639.00)
Vendors of Record for the
Supply and Delivery of Various
supply and delivery of erosion
Terrafix Geosynthetics Inc.;
Erosion and Sediment Control
$760.00
and sediment control
Hanes GeoComponents
Materials
materials.
Dyed Diesel Fuel Supply and
Vendors of Record for dyed
Alpha Oil Inc
Delivery for 2018 Construction
diesel for various 2018
$65,000.00
nc.
Clean Fuels Inc.
Season
construction projects.
TOTALINCREASE
$1,902,250.00
TOTAL DECREASE
($4,492,889.00)
NET TOTAL
($2,590,639.00)
*Note: Negative values represent reduction in Contract Cost due to scope changes.
21