HomeMy WebLinkAbout02-19_Minutes_Executive_Committee_2019-03-01Toronto and Region
Conservation
Authority
Executive Committee Meeting #2/19 was held at TRCA Head Office, on Friday, March 1,
2019. The Chair Jennifer Innis, called the meeting to order at 9:34 a.m.
PRESENT
Jennifer Innis
Chair
Jack Heath
Vice -Chair
Dipika Damerla
Member
Glenn De Baeremaeker
Member
Linda Jackson
Member
Mike Mattos
Member
Anthony Perruzza
Member
ABSENT
Paul Ainslie
Member
Ronald Chopowick
Member
Vincent Crisanti
Member
Joanne Dies
Member
Gordon Highet
Member
The Chair recited the Acknowledgement of Indigenous Territory.
RES.#B17/19 - MINUTES OF MEETING #1/19, HELD ON FEBRUARY 8, 2019
Moved by: Glenn De Baeremaeker
Seconded by: Linda Jackson
THAT the Minutes of Meeting #61/19, held on February 8, 2019, be approved.
1
Section I — Items for Board of Directors Action
RES.#B18/19 - BOLTON CAMP REDEVELOPMENT MUNICIPAL SERVICING
PROJECT
Award of Contract 2018-096T for the installation of new water and
wastewater services at Bolton Camp, Town of Caledon, in the Regional
Municipality of Peel.
Moved by: Dipika Damerla
Seconded by: Jack Heath
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Contract 2018-096T be awarded to
Earth Boring Co. Limited for the supply of all labour, equipment and materials necessary
to install new water and wastewater services to Bolton Camp, in the Town of Caledon, at
a total cost not to exceed $3,847,082, plus HST, as they are the lowest bidder that meets
Toronto and Region Conservation Authority (TRCA) specifications;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 20%
of the contract cost as a contingency allowance, if deemed necessary;
THAT should staff be unable to execute an acceptable contract with the awarded
contractor, staff be authorized to enter into and conclude contract negotiations with the
other contractor that submitted a tender;
AND FURTHER THAT authorized TRCA officials be directed to take any action necessary
to implement the agreement including obtaining any required approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Since the purchase of the Bolton Camp property, TRCA staff has been consulting with municipal
partners and community groups on redevelopment of the property and what it should ultimately
be used for. Through this process, staff has developed a concept plan for re -purposing Bolton
Camp from its previous use as an overnight summer camp for youth and families of Toronto to
an outdoor centre for participants of all ages. Proposed programming at the renewed Bolton
Camp may include adventure, sports and fitness activities, community art and culture programs,
outdoor education and training, leadership development and social entrepreneurship
opportunities.
Phase one of the redevelopment commenced in 2017 with planned completion in 2020 and will
focus on transforming the lower camp area into a multi -functional space with a specific focus on
involving and servicing a variety of community needs. This phase one work includes operational
requirements such as site servicing (water, sewer, hydro), a new entrance and internal
roadways, parking lots, bridge replacement, and retrofitting the former recreation hall building
and outdoor pool into an inclusive community recreation complex. During this re -launch period,
TRCA is also developing partnerships with like-minded community groups and organizations
such as the Canadian Tire Jumpstart Charities, Jays Care Foundation, YMCA, Caledon
Challenger Baseball, Caledon Community Services, local schools, Rotary Clubs and others to
develop and implement compelling recreational, health and wellness activities, arts and culture
programs and education -based initiatives that will serve a variety of interests and meet
community needs.
Most recently, the accessible baseball diamond was completed in June 2018 in partnership with
the Caledon Challenger Baseball Program, Jays Care Foundation and the Town of Caledon and
is the first major development to be realized at Bolton Camp. Currently, the new high voltage
hydro service is being installed with completion scheduled for early Spring 2019.
The Bolton Camp property was previously serviced by well and septic systems; the introduction
of water and wastewater is imperative to the future programming and site amenities as well as
in obtaining full site plan approval.
At Executive Meeting #1/18, held on March 2, 2018, Resolution #B6/18 was approved, in part,
as follows:
The Regional Municipality of Peel -Water and Wastewater Infrastructure Consulting
Services Agreement. Approval to enter into an agreement with The Regional
Municipality of Peel for consulting services in support of water and wastewater
infrastructure improvements at Bolton Camp, Town of Ca/edon, in the Regional
Municipality of Peel.
As part of the Town of Caledon's Site Plan Approval for the redevelopment of Bolton Camp, the
municipal infrastructure design is a critical component to provide domestic and fire protection
water supply as well as sewage/wastewater disposal for the future operations and
programming. TRCA staff engaged the Region of Peel's Public Works staff to provide their
knowledge and expertise based on their extensive experience in implementing infrastructure
projects of a similar nature. The Region of Peel's Public Works staff worked with TRCA to
facilitate the detailed design and procurement for the proposed services. The design consists of
approximately 1.2km of water and sanitary force mains including an on-site pumping station.
The water main will supply both domestic water demands and fire flow requirements to satisfy
Ontario Building Code requirements for occupancy and on-site fire suppression. The sanitary
force main will allow for future connections to washroom facilities being proposed for planned
retrofits to the existing buildings. The alignment of the site servicing and location of the pumping
station has been designed to mitigate disturbance to the sensitive areas within Bolton Camp
and the construction methodology will include erosion control measures to protect the
surrounding environment.
RATIONALE
Tender 2018-096T was publicly advertised on the electronic procurement website Bid&Tenders
(http://www.bidandtenders.ca/) on December 21, 2018 with a mandatory site information
meeting held on January 7, 2019. Approximately 50 contractors attended the site meeting
varying from general contractors, material suppliers and specialized construction trades.
The Region of Peel's Purchasing department and TRCA staff opened the Tenders on February
8, 2019 with the following results:
Tender #2018-096T
Construction of Sewage Pump Station, Sanitary Sewer and Watermain at Bolton Camp,
Town of Caledon
BIDDERS
TOTAL
(plus HST)
Earth Boring Co. Limited
$3,847,082
London Excavators & Trucking Ltd
$4,458,299
Sierra Excavating Enterprises Inc
$4,936,860
Drainstar Contracting Ltd.
$6,157,084
Robert B. Somerville Co. Limited
$7,713,012
Sona Constructor Inc.
$7,897,000
TRCA staff reviewed the bid received from Earth Boring Co. Limited against the cost estimate
and has determined that the bid is of reasonable value and also meets the requirements as
outlined in the contract documents. Further assessment by TRCA staff of Earth Boring Co.
Limited's experience and ability to undertake similar projects was conducted through reference
checks which resulted in positive feedback that Earth Boring Co. Limited is capable of
undertaking the scope of work.
Based on the bids received, staff recommends that Earth Boring Co. Limited be awarded
Contract #2018-096T for the supply of all labour, equipment and materials necessary to install
new water and wastewater services to Bolton Camp, in the Town of Caledon, at a total cost not
to exceed $3,847,082, plus HST, as they are the lowest bidder that meets TRCA specifications.
The project is scheduled to be substantially completed by October 31, 2019. The property is not
currently open to the public, however, summer programs including the use of the baseball
diamond will continue. Appropriate construction fencing and signage will be erected around the
construction areas and was included in the tender pricing.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
Strategy 5 —Foster sustainable citizenship
FINANCIAL DETAILS
Funds required to complete this project are available from the Region of Peel Capital Funding
within account code # 433-20
Report prepared by: Aaron J. D'Souza, extension 5775
Emails: aidsouzaCa)trca.on.ca
For Information contact: Darryl Gray, 416-791-0327, Aaron J. D'Souza, extension 5775
Emails: dgray@trca.on.ca, aidsouzana.trca.on.ca
Date: February 6, 2019
Section II — Items for Executive Action
RES.#B19/19 - REQUEST FOR PROPOSAL FOR CONSULTING SERVICES TO
MIGRATE IBM NOTES TO OUTLOOK ONLINE
Award of Request for Proposal (RFP) No. 10009831 for consulting
services to migrate TRCA from existing IBM Notes email, calendar and
resource reservations to Office 365 Outlook online.
Moved by: Mike Mattos
Seconded by: Dipika Damerla
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a project
that requires technical consulting services;
AND WHEREAS TRCA solicited proposals through a publicly advertised process and
evaluated the proposals based on pre -established criteria;
THEREFORE, LET IT BE RESOLVED THAT Request for Proposal (RFP) No. 10009831 for
Migration from IBM Notes to Outlook Online be awarded to TELUS Communications Inc.
at a total cost not to exceed $125,975 plus applicable taxes, to be expended as
authorized by TRCA staff;
THAT should TRCA staff be unable to negotiate a contract with the above-mentioned
proponent, staff be authorized to enter into and conclude contract negotiations with
other Proponents that submitted proposals, beginning with the next highest ranked
Proponent meeting TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals
and the signing and execution of any documents.
CARRIED
BACKGROUND
TRCA is undergoing a major transformation in how it utilizes information technology (IT) across
the organization. One of the priority initiatives is to replace the Lotus Notes email system,
migrating all email and calendar services to Microsoft Outlook using the cloud -based Office 365
solution. This decision is aligned with the new Digital Transformation Strategy direction to move
all TRCA technology operations to a cloud computing environment. Migrating to a cloud -based
IT environment will eliminate the need for a formal data centre in TRCA's new headquarters as
well as allow for better staff access to applications from any location over the Internet with
improved reliability and business continuity.
At the Friday July 20, 2018 Authority Meeting #6/18 the report titled "Information Technology
Consulting Services, Award of Preferred Source Contract" was approved regarding consulting
services to support the migration from Lotus Notes to Outlook online. Information Technology
had planned to use this consultant to complete the migration to Outlook in the fall of 2018.
The migration did not take place as planned due to other operational priorities introduced by the
newly hired Chief Information Officer and other business priorities including the introduction and
launch of a Human Resources Information System in January 2019. The consultants hired in
2018 had completed minimal work towards the migration and the engagement and associated
procurement of services was terminated as per section 1.9 of the agreement of professional
information technology consulting services. In January 2019, a request for proposal was issued
to solicit proposals to perform the migration of email and calendar from Lotus Notes to Outlook
online. Three complete proposals were received and evaluated with TELUS Communications
Inc. being recommended as the successful proponent.
RATIONALE
RFP documentation was emailed to vendors from the Province of Ontario's Vendor of Record
list for Technology Consulting Services on Thursday, January 3, 2019 and closed on Thursday,
January 24, 2019. 2 addendums were issued to respond to questions received. A total of 5 firms
received the documents and 3 proposals were received from the following Proponent(s):
TELUS Communications Inc.
DXC Technology
Long View Systems Corporation
An Evaluation Committee comprised of staff from Information Technology Management
reviewed the proposals. The criteria used to evaluate and select the recommended Proponent
included the following:
Criteria
Weight
Proponent's Information and Profile
• Proponent has provided all requested information in a clear manner.
5
Key Personnel
• Demonstrated experience in similar migrations projects.
• Expert knowledge of IBM Notes environments, configurations and application
functionality.
• Demonstrated experience with Microsoft's Office 365 environment,
10
specifically; Outlook Online, its functionality, configurations and how it relates
to migrations such that being proposed.
Experience and Methodology
• Proponent will have demonstrated experience in similar migration projects
under similar timelines as required by the Scope of Work
• Proposed methodologies have been used in previous projects of similar
25
scale and scope. The methodologies are well tested with clear processes
and procedures detailed in the proposal.
Scope of Work Capabilities
• The proponent can demonstrate their ability to meet or exceed the project
15
items as detailed in the Scope of Work.
Proposed Work Plan and Timeframe
• The proposed Work Plan is clearly outlined in a manner which details all
15
work activities, who is responsible for each activity, along with the timing
associated with each activity.
• The Work Plan details the time required from initiation of the Project until
completion, including any contingencies required for unforeseen issues such
as technical problems or resource allocations.
Sub -Total (minimum score of 50 required) 70
Pricing (minimum score of 20 required) 30
Total Points (minimum score of 70 required) 100
TELUS Communications Inc. demonstrated the most experience managing similar migrations.
They provided the most efficient timeline and workplan for this project. Therefore, it is
recommended that contract No. 10009831 be awarded to TELUS Communications Inc. at a
total cost not to exceed $125,975, plus applicable taxes, it being the highest ranked Proponent
meeting TRCA specifications. Proponent's scores and staff analysis of the evaluation results
can be provided in an in -camera presentation, upon request.
Timeline
Once a contract is executed between TRCA and TELUS Communications Inc. the project will
commence. Based on the proposal timeline the project is estimated to be completed within 8 to
10 weeks from commencement. It is anticipated that the migration will be completed in late May
2019.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 7 — Build partnerships and new business models
Strategy 10 — Accelerate innovation
Strategy 11 — Invest in our staff
FINANCIAL DETAILS
Funds are identified in TRCA's 2019 capital budget from TRCA's municipal partners in the IT
capital budget account 014-01.
Report prepared by: James Dong, extension 5357
Emails: jdong@trca.on.ca
For Information contact: Chris J. Moore, extension 5720
Emails: chrisj.moore@trca.on.ca
Date: February 12, 2019
Section III — Items for the Information of the Board
STRATEGIC BUSINESS PLANNING INITIATIVE
Journey Cannabis and Beer Expo: to provide information to the Executive
Committee of the Board of Directors regarding a new event which will be
hosted at Boyd Conservation Area on August 23rd — 25" 2019.
Moved by: Linda Jackson
Seconded by: Mike Mattos
WHEREAS TRCA was approached by Rick Davis Promotions Inc. with a proposal to host
an expo at Boyd Conservation Area geared towards education around the safe and
responsible consumption of beer and cannabis products;
AND WHEREAS TRCA staff reviewed this request in accordance with the Strategic
Business Planning Policy and Procedures and in consultation with City of Vaughan
representatives;
THEREFORE, IT IS RECOMMENDED THAT the provided report outlining details of the
Journey Cannabis and Beer Expo event to be held by Rick Davis Promotions Inc. at Boyd
Conservation Area between August 23rd- 25th, 2019 be received.
CARRIED
BACKGROUND
In accordance with Toronto and Region Conservation Authority's (TRCA) Strategic Business
Planning Policy and Procedure (SBPPP), all potential new projects/programs or proposed
modifications to existing initiatives must proceed through the SBPPP work flow, including
reporting to the Board of Directors for informational purposes.
In 2018 TRCA was approached by Rick Davis Promotions Inc. with a preliminary proposal to host
the Journey Cannabis and Beer Expo at Boyd Conservation Area. Upon receipt of a detailed
operations plan for the event, TRCA staff completed a Statement of Interest form as per TRCA's
Strategic Business Planning Policy and Procedure, which requires review and approval from
Senior Leadership Team (SLT). This SLT approval was received on January 3, 2019 with an
added requirement to consult with City of Vaughan staff and Board of Director representatives to
determine any issues requiring further consideration.
The Journey Cannabis and Beer Expo will feature live music, entertainment, food and beverage
sales, as well as experiential marketing and education focused around craft beer and cannabis.
The event is scheduled to take place at Boyd Conservation Area on August 23 — 25, 2019 from
11 am —11 pm nightly. The expo will showcase responsible consumption of beer and cannabis
products, educate the public regarding the perils of addiction and abuse, with a percentage of the
proceeds to go towards support of substance abuse organizations.
With estimated event attendance of 10,000 people per day, the expo will require exclusive use of
Boyd Conservation Area to ensure public safety and security. Rick Davis Promotions Inc. will be
responsible for obtaining all permits and licensing, security, paid duty police officers, first aid,
sales, traffic control, insurance, and general operations during the event. Cannabis will not be
sold at the event. Staff have taken into account suggestions from City representatives into
planning for the event preparing detailed contractual agreements.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
This program will attract new user markets to Boyd Conservation Area, contributing to further
growth within the Tourism and Recreation Service Area.
FINANCIAL DETAILS
As a result of hosting this event, TRCA anticipates receiving approximately $75,000 in revenue
from Rick Davis Promotions Inc. for hosting the Journey Cannabis and Beer Expo. The revenues
generated from this event will support ongoing corporate -wide operations.
DETAILS OF WORK TO BE DONE
Prior to the execution of an agreement, a detailed assessment of the following criteria will be
completed in consultation with TRCA Corporate Services staff and legal counsel to ensure
appropriate mitigation measures will be included in the final Agreement, including but not limited
to:
• Risk;
• Change to the anticipated audience attending the events;
• Alignment with TRCA's professional standards and core values (both the event and
the partner organization);
Following discussions with senior staff at the City of Vaughan, no additional permits will be
required as cannabis will not be sold during the event. TRCA will continue to work closely with
senior City of Vaughan staff to ensure that all event messaging and details are aligned with both
TRCA's and Vaughan's corporate communications standards.
In order to measure and evaluate the success of the event, staff will conduct a review of the event
to measure the performance based on the following metrics which will be included in TRCA's
Business Intelligence Tool:
• Revenues generated (gross and net);
• Attendance.
Report prepared by: Kimberly Krawczyk, extension 5862
Emails: kkrawczyk@trca.on.ca
For Information contact: Doug Miller, 416-294-4698
Emails: dmiller@trca.on.ca
Date: March 1. 2019
Section IV — Ontario Regulation 166/06, As Amended
RES.#621/19 - STANDARD DELEGATED PERMITS
Moved by: Linda Jackson
Seconded by: Glenn De Baeremaeker
THAT standard delegated permits, permission for routine infrastructure works, minor
works letter of approval and permits after the fact, granted by Toronto and Region
Conservation Authority staff, in accordance with Ontario Regulation 166/06, as amended,
which are listed below, be received.
CARRIED
11.1 STANDARD DELEGATED PERMITS FOR RECEIPT— STAFF APPROVED AND
ISSUED
Delegated Permits are processed by Planning and Development Division staff,
authorized by designated staff appointed as Enforcement Officers by the Board of
Directors and received monthly by the Executive Committee. Delegated permits are
categorized as standard, routine infrastructure works, emergency infrastructure works,
minor works and permits after the fact/resolution of violations. Standard permits are
non-complex permissions consistent with TRCA approved policies and procedures and
issued for a time period of two years or less.
CITY OF BRAMPTON
51 SORBONNE DRIVE - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new residential unit and one new egress
window and the enlargement of one window, located in the basement of an existing residential
dwelling associated with a municipal building permit. The subject property is located at 51
Sorbonne Drive, in the City of Brampton.
CFN: 60910 - Application #: 0009/19/BRAM
Report Prepared by: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
For information contact: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
Date: February 11, 2019
CITY OF MARKHAM
16 CACHET PARKWAY - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two-storey replacement dwelling and front
yard septic system at 16 Cachet Parkway, Markham. The works also include the site alteration
and restoration of the area disturbed by the demolition/removal of the existing dwelling situated
at the rear of the subject property.
CFN: 60451 -Application #: 1013/18/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: January 22, 2019
59 BURNDENFORD CRESCENT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulation Area of the Rouge River
Watershed to facilitate the construction of replacement deck approximately 59.5 square metres
in size at the rear of 59 Burndenford Crescent, Markham.
CFN: 61012 - Application #: 0104/19/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: February 14, 2019
SLATE OFFICE II L.P. C/O SLATE ASSET MANAGEMENT L.P. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to facilitate the replacement of a parking lot staircase at 3000 Steeles Avenue, Markham.
CFN: 60605 - Application #: 1121/18/MARK
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: February 5, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Mimico Creek Watershed
The purpose is to remove an existing abandoned 600 mm diameter concrete sanitary sewer and
an existing 200 mm diameter watermain located on Royal York Road, between Thompson
Avenue and Leland Avenue, in the City of Toronto. The warm water construction timing window
will apply to this project.
CFN: 59944 - Application #: 0633/181TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: February 1, 2019
1 LAKE SHORE DRIVE - Waterfront Watershed
The purpose is to construct a new covered porch, privacy wall, second storey rear platform, and
a secondary suite to the existing single family detached dwelling at 1 Lake Shore Drive in the
City of Toronto (Etobicoke York Community Council Area).
CFN: 60908 - Application #: 0004/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nmoxley@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 8, 2019
196 ELLIS AVENUE - Humber River Watershed
The purpose is to underpin the basement of the existing two-storey single family dwelling at 196
Ellis Avenue in the City of Toronto (Toronto & East York Community Council Area).
CFN: 60712 - Application #: 1186/18/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 5, 2018
WOODBINE ENTERTAINMENT GROUP - Humber River Watershed
The purpose is to install an upgraded inlet to the existing North Irrigation Pond, including a new
1800 mm diameter pipe, concrete headwall with chute blocks, upgraded erosion control
measures and minor expansion and clean out of the existing forebay at 555 Rexdale Boulevard.
CFN: 60302 - Application #: 0835/181TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 31, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Don River Watershed
The purpose is to rehabilitate the West Don sanitary trunk sewer (STS), which follows the West
Don River at Yonge Street and Wilson Avenue, in Toronto. The warm water construction timing
window will apply to this project.
CFN: 56667 - Application #: 0157/181TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
For information contact: Leila Sotoudeh, extension 5925, email Isotoudeh@trca.on.ca
Date: February 7, 2019
CITY OF TORONTO - Don River Watershed
The purpose is to construct a replacement staircase on the valley slope within Villaways Park,
located at 41 Adra Villaway (associated development 1 Adra Villaway), in the City of Toronto
(North York Community Council Area).
CFN: 60124 - Application #: 0698/181TOR
Report Prepared by: Mark Rapus, extension 5259, email mrapus@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 12, 2019
34 MEDALIST ROAD - Don River Watershed
The purpose is to construct a two storey replacement dwelling with attached rear covered patio
and basement walkout where an existing two storey single family detached dwelling is currently
located at 34 Medalist Road in the City of Toronto (North York Community Council Area).
CFN: 59549 - Application #: 0286/181TOR
Report Prepared by: Stephanie Worron, extension 5907, email
steph an i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 5, 2019
27 KNIGHTSWOOD ROAD - Don River Watershed
The purpose is to construct a covered porch, two storey addition on the north side of the
dwelling and a second storey addition to the south, over the existing two and a half storey single
family detached dwelling located at 27 Knightswood Road in the City of Toronto (North York
Community Council Area).
CFN: 60608 - Application #: 1122/18/TOR
Report Prepared by: Stephanie Worron, extension 5907, email
Stephan i e.worron@trca.o n.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 5, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
47 PINE RIDGE DRIVE - Waterfront Watershed
The purpose is to construct a new one storey addition to the rear of the existing single storey
detached dwelling as well as the underpinning of a portion of the basement at 47 Pine Ridge
Drive. The proposal also includes the reconstruction of a portion of the existing dwelling, a new
rear deck and steps along with interlocking pavers between the house and detached garage.
CFN: 60103 - Application #: 0681/181TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 4, 2019
CORELAND CENTRES INC. - Highland Creek Watershed
The purpose is to install a ground sign for an existing restaurant located at 1620 Birchmount
Road in the City of Toronto (Scarborough Community Council Area).
CFN: 60951 - Application #: 0032/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step h an i e.worro n@trca. o n. ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: January 28, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
44 ELLIS PARK ROAD - Humber River Watershed
The purpose is to construct a three storey single family dwelling at 44 Ellis Park Road in the City
of Toronto (Toronto and East Community Council Area).
CFN: 60556 - Application #: 1078/18/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 13, 2019
CITY OF VAUGHAN
NASHVILLE DEVELOPMENTS (NORTH) INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a pedestrian trail in a draft approved plan of
subdivision (19T -16V010) within Block 61 West, northeast of Major Mackenzie Drive and
Huntington Road, in the City of Vaughan.
CFN: 60472 - Application #: 1030/18/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email sbohan@trca.on.ca
For information contact: Coreena Smith, extension 5269, email csmith@trca.on.ca
Date: January 30, 2019
REGIONAL MUNICIPALITY OF YORK - Don River Watershed
The purpose is to undertake widening of Bathurst Street and installation of a storm sewer
between Worth Boulevard and Highway 407. The road works include road widening, repair and
replacement of sidewalks and curbs, installation of new medians and bike lanes. Servicing
works will include replacement of drainage structures including manholes and grates and
covers, installation of a new oil -grit separator unit. The project is a requirement for VIVAnext
Bus Rapid Transit(BRT) project.
CFN: 56529 - Application #: 1037/16/VAUG
Report Prepared by: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
For information contact: Harsha Gammanpila, extension 5629, email
hgammanpila@trca.on.ca
Date: January 30, 2019
REGIONAL MUNICIPALITY OF YORK - Don River Watershed
The purpose is to undertake culvert rehabilitation works on Major Mackenzie Drive West,
approximately 300 metres east of Highway 400, in the City of Vaughan. The proposed culvert
rehabilitation works include relining an existing corrugated steel pipe (CSP) culvert, extending
an existing concrete headwall, and constructing a new wingwall. The warm water construction
timing window will apply to this proposal.
CFN: 60022 - Application #: 0762/181VAUG
Report Prepared by: Ron Ofer, extension 5798, email rofer@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: February 5, 2019
TOWN OF CALEDON
19558 ST. ANDREWS ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to construct a new private 20 stall horse barn and indoor riding ring, an
outdoor sand ring, manure storage, a gravel driveway, and grading, associated with a municipal
building permit. The subject property is located at 19558 St. Andrews Road in the Town of
Caledon.
CFN: 60512 - Application #: 1154/18/CAL
Report Prepared by: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
For information contact: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
Date: February 13, 2019
TOWN OF CALEDON - Humber River Watershed
The purpose is to replace an existing culvert and reconstruct approximately 250 m of The
Grange Sideroad, southwest of Mountainview Road in the Town of Caledon. The Redside Dace
construction timing window will be applied to this project unless otherwise specified in writing by
the Ministry of Natural Resources and Forestry (MNRF).
CFN: 56327 - Application #: 0781/16/CAL
Report Prepared by: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
For information contact: Caroline Mugo, extension 5689, email cmugo@trca.on.ca
Date: February 7, 2019
TOWN OF RICHMOND HILL
14 KELLOGG CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed to facilitate the construction of a partially covered deck at the rear of 14 Kellogg
Crescent, Richmond Hill. The works also consist of the construction of a shed in the rear yard.
CFN: 60983 - Application #: 0089/19/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: February 5, 2019
32 SUNSET BEACH ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 169.53 sq. m. (1824.85 sq. ft.) dwelling with
an attached 38.94 sq. m. (419.20) garage located at 32 Sunset Beach Road, Richmond Hill.
CFN: 61002 - Application #: 0074/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.on.ca
For information contact: Doris Cheng, extension 5306, email dcheng@trca.on.ca
Date: February 12, 2019
36 SUNSET BEACH ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 156.87 sq. m. (1688.57 sq. ft.) dwelling and
38.54 sq. m. (414.85) sq. ft. attached garage located at 36 Sunset Beach Road, Richmond Hill.
CFN: 61001 -Application #: 0075/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.on.ca
For information contact: Linda Bui, extension 5289, email linda.bui@trca.on.ca
Date: February 12, 2019
34 PEGASUS DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the re -construction of a 125 sq. m. (1349 sq. ft.) dwelling with
attached garage located at 34 Pegasus Drive, Richmond Hill.
CFN: 61044 - Application #: 0120/191RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.on.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.on.ca
Date: February 14, 2019
212 LAKELAND CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 398.70 square metre two-storey
replacement dwelling at 212 Lakeland Crescent, Richmond Hill.
CFN: 60964 - Application #: 0063/19/RH
Report Prepared by: Aidan Pereira, extension 5723, email apereira@trca.on.ca
For information contact: Aidan Pereira, extension 5723, email apereira@trca.on.ca
Date: February 12, 2019
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for Routine Infrastructure Works, including Emergency Infrastructure Works
permissions, are subject to authorization by staff designated as Enforcement Officers as per
Authority Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure
works are located within a regulated area, generally within or adjacent to the hazard or natural
feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF PICKERING
ENBRIDGE PIPELINES INC.
To undertake structure maintenance on an existing pipeline at an Enbridge Pipelines Inc. site,
located northeast of the intersection of Dixie Road and Third Concession Road, in the City of
Pickering, Duffins Creek Watershed, as located on property owned by Her Majesty the Queen in
Right of Ontario - as represented by Ontario Infrastructure and Lands Corporation and on an
existing Enbridge Pipelines Inc. easement. The purpose is to undertake an integrity dig to
install 90 m of pressure containing split sleeves around a section of an existing pipeline at an
Enbridge Pipelines Inc. site, located northeast of the intersection of Dixie Road and Third
Concession Road, in the City of Pickering. No in -water works are associated with this project.
CFN: 60426 - Application #: 0994/18/PICK
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: February 15, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at the north west corner of Brock Road and Finch Avenue, in the City of Pickering, Duff ins
Creek Watershed, as located on property owned by the Regional Municipality of Durham. The
purpose is to install a new 75 mm diameter conduit at the north west corner of Brock Road and
Finch Avenue, in the City of Pickering. No in -water work is associated with this project.
CFN: 60418 - Application #: 0972/181PICK
Report Prepared by: Annette Lister, extension 5266, email alister@trca.on.ca
For information contact: Annette Lister, extension 5266, email alister@trca.on.ca
Date: February 20, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and to undertake fence installation in
Rennie Park, located at 1 Rennie Terrace, in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed as located on property owned by the City of Toronto.
The purpose is to undertake improvements to the existing tennis courts, located at 1 Rennie
Terrace, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 59187 - Application #: 0102/181TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.on.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.on.ca
Date: February 4, 2019
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Finch Avenue West from 100m
east of Humberline Drive to Humber River, in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed as located on property owned by the City of Toronto.
The purpose is to undertake road resurfacing, curb and sidewalk repairs, and replace existing
frame and cover of existing catch basins, manholes and valve chambers on Finch Avenue
West, from 100 m east of Humberline Drive to Humber River, in Etobicoke, Toronto. No in -water
works are within the scope of this project.
CFN: 60653 - Application #: 1170/181TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.on.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.on.ca
Date: February 8, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction in Heathrow Park, located at 69
Heathrow Drive, near Jane Street and Wilson Avenue, in the City of Toronto (North York
Community Council Area), Humber River Watershed as located on property owned by the City
of Toronto. The purpose is to create a new park access and upgrade existing trails for
accessibility in Heathrow Park, located at 69 Heathrow Drive, near Jane Street and Wilson
Avenue, in North York, Toronto. No in -water work is within the scope of this project.
CFN: 59952 - Application #: 0788/181TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.on.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.on.ca
Date: February 5, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Collingwood Street, near Sheppard
Avenue East and Kennedy Road, in the City of Toronto (Scarborough Community Council
Area), Highland Creek Watershed as located on property owned by the City of Toronto. The
purpose is to undertake road resurfacing and replacement of curbs and sidewalks on
Collingwood Street, near Sheppard Avenue East and Kennedy Road, in Scarborough, Toronto.
No in -water work is within the scope of this project.
CFN: 60546 - Application #: 1093/18/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.on.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.on.ca
Date: February 5, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction and to undertake sewer, watermain or
utility installation or maintenance within an existing roadway on Beth Nealson Drive, from
Thorncliffe Park Drive to Wicksteed Avenue in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed as located on property owned by the City of
Toronto. The purpose is to replace an existing 300 mm diameter watermain with a new 300 mm
diameter watermain, resurface the roadway, and to replace curbs and sidewalks on Beth
Nealson Drive, between Wicksteed Avenue and Overlea Boulevard, in the City of Toronto. No
in -water work is within the scope of this project.
CFN: 60547 - Application #: 1091/18/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.on.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.on.ca
Date: February 5, 2019
CITY OF VAUGHAN
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 10000 Dufferin Street north of Major Mackenzie Drive West, in the City of Vaughan, Don
River Watershed as located on the property owned by Regional Municipality of York. The
purpose is to undertake replacement of Bell conduit and installation of Bell equipment within the
road right-of-way (ROW) of Dufferin Street north of Major Mackenzie Drive West.
CFN: 60027 - Application #: 0716/18NAUG
Report Prepared by: Manirul Islam, extension 5715, email mislam@trca.on.ca
For information contact: Manirul Islam, extension 5715, email mislam@trca.on.ca
Date: February 11, 2019
REGIONAL MUNICIPALITY OF YORK
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Jane Street from Rutherford Road to Auto Vaughan Drive, in the City of Vaughan, Don River
Watershed as located on property owned by The Regional Municipality of York. The purpose is
to install a 2" High Density Polyethylene (HDPE) pipe and a fibre optic cable for the York
Telecom Network (YTN) on the west side of Jane Street, between Rutherford Road and Auto
Vaughan Drive, in the City of Vaughan. The proposed HDPE pipe will be installed below an
existing concrete culvert, located 200 metres north of Rutherford Road. The Ministry of Natural
Resources and Forestry (MNRF) Redside Dace construction timing window will apply to this
proposal, unless otherwise specified in writing by MNRF.
CFN: 60493 - Application #: 1020/18NAUG
Report Prepared by: Ron Ofer, extension 5798, email rofer@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: February 12, 2019
REGIONAL MUNICIPALITY OF YORK
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Major Mackenzie Drive West, Dufferin Street to Bathurst Street, in the City of Vaughan, Don
River Watershed as located on property owned by The Regional Municipality of York. The
purpose is to install a 2" High Density Polyethylene (HDPE) pipe and a fibre optic cable for the
York Telecom Network on the north side of Major Mackenzie Drive West, between Dufferin
Street and Bathurst Street, in the City of Vaughan. The proposed HDPE pipe will be installed
above an existing concrete culvert located 130 metres east of Dufferin Street, and above an
existing concrete box culvert located 740 metres west of Bathurst Street. The Ministry of Natural
Resources and Forestry (MNRF) Redside Dace construction timing window will apply to this
project, unless otherwise specified in writing by MNRF.
CFN: 60506 - Application #: 1058/18/VAUG
Report Prepared by: Ron Ofer, extension 5798, email rofer@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: February 12, 2019
TOWN OF RICHMOND HILL
REGIONAL MUNICIPALITY OF YORK
To undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Major Mackenzie Drive West, Bathurst Street to Trench Street, in the Town of Richmond Hill,
Don River Watershed as located on property owned by The Regional Municipality of York. The
purpose is to install a 2" High Density Polyethylene (HDPE) pipe and a fibre optic cable for the
York Telecom Network on the north side of Major Mackenzie Drive West, between Bathurst
Street and Trench Street, in the Town of Richmond Hill. The proposed HDPE pipe will be
installed above an existing concrete culvert located 45 metres east of Bathurst Street, and
above an existing concrete culvert located 950 metres east of Bathurst Street. The Ministry of
Natural Resources and Forestry (MNRF) Redside Dace construction timing window will apply to
this proposal, unless otherwise specified in writing by MNRF.
CFN: 60507 - Application #: 1060/18/RH
Report Prepared by: Ron Ofer, extension 5798, email rofer@trca.on.ca
For information contact: Harsimrat Pruthi, extension 5744, email hpruthi@trca.on.ca
Date: February 12, 2019
TOWNSHIP OF KING
ENBRIDGE GAS INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway and on private property located at 12699 Jane Street, in the Township of King, Humber
River Watershed, as located on property owned by a private landowner to whom Enbridge Gas
Inc. is providing service at their request and on property owned by the Regional Municipality of
York as per the Franchise Agreement with Enbridge Gas Inc.. The purpose is to install a NPS 1
PE IP gas pipe to service 12699 Jane Street in the Township of King. No in -water work is
associated with this project.
CFN: 60892 - Application #: 0069/19/KING
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: February 15, 2019
ENBRIDGE GAS INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway and on private property located at 12673 Jane Street, in the Township of King, Humber
River Watershed, as located on property owned by a private landowner to whom Enbridge Gas
Inc. is providing service at their request and on property owned by the Regional Municipality of
York as per the Franchise Agreement with Enbridge Gas Inc.. The purpose is to install NPS 1
PE IP gas pipe to service 12673 Jane Street in the Township of King. No in -water work is
associated with this project.
CFN: 60893 - Application #: 0068/19/KING
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.on.ca
Date: February 15, 2019
MINOR WORKS LETTER OF APPROVAL FOR RECEIPT — STAFF APPROVED AND
ISSUED
Permission for Minor Works Letter of Approval are issued for works located within a regulated
area, adjacent to a natural feature or natural hazard, that do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land. Permissions include ancillary
structures such as decks, garages, sheds, pools and minor fill placement/landscaping.
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
57 HAMPSHIRE HEIGHTS
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 57, Plan M-701, (57 Hampshire
Heights), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek
Watershed.
CFN: 60982 - Application #: 0085/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 1, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
1397 MILITARY TRAIL
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Lot 8, Concession 1, (1397 Military
Trail), in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed.
CFN: 60999 - Application #: 0066/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email
step h an i e.worro n@trca. o n. ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 7, 2019
CITY OF VAUGHAN
80 ORICO COURT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 7, Plan 65M-3126, (80 Orico Court),
in the City of Vaughan, Humber River Watershed.
CFN: 61004 - Application #: 0080/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: February 13, 2019
53 CAMLAREN CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and change the use, size, or number of
dwelling units of a structure, or undertake work that does not change the footprint of the existing
structure on Lot 52, Plan M-1230, (53 Camlaren Crescent), in the City of Vaughan, Humber
River Watershed.
CFN: 60965 - Application M 0057/19/VAUG
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.on.ca
For information contact: Jackie Burkart, extension 5304, email jburkart@trca.on.ca
Date: February 4, 2019
TOWN OF CALEDON
ESPRIT, 9623523 CANADA INC.
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on, (100 Morra
Avenue), in the Town of Caledon, Humber River Watershed.
CFN: 60918 - Application M 0017/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
For information contact: Nicholas Cascone, extension 5927, email ncascone@trca.on.ca
Date: February 5, 2019
TOWNSHIP OF KING
4865 16TH SIDEROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 15, Concession 7, (4865 16th Sideroad), in the
Township of King, Humber River Watershed.
CFN: 61008 - Application M 0086/19/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: February 13, 2019
13495 7TH CONCESSION ROAD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 9, Concession 6, (13495 7th
Concession), in the Township of King, Humber River Watershed.
CFN: 61009 - Application M 0087/19/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email asyhlonyk@trca.on.ca
For information contact: Colleen Bonner, extension 5307, email cbonner@trca.on.ca
Date: February 19, 2019
PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for works undertaken without the benefit of a TRCA permit in a regulated area,
where such works comply with TRCA policies and procedures, are considered permits after the
fact and subject to an additional administrative fee.
CITY OF MISSISSAUGA
3250 VICTORY CRESCENT - Mimico Creek Watershed
The purpose is to recognize an existing side entrance, constructed by a previous owner of the
home without the benefit of TRCA or municipal permits within a TRCA Regulated Area of the
Mimico Creek Watershed. The subject property is located at 3250 Victory Crescent, in the City
of Mississauga.
CFN: 60955 - Application #: 0028/19/MISS
Report Prepared by: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
For information contact: Colleen Bain, extension 5657, email colleen.bain@trca.on.ca
Date: February 6, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
12 WINTON ROAD - Don River Watershed
The purpose is to develop within a TRCA Regulated Area of the Don River watershed in order
to permit, after -the -fact, the as -built retaining wall to the south side of the property along the toe
of slope. The as -built retaining wall replaced a previous stone retaining wall at 12 Winton Road
in the City of Toronto (North York Community Council Area). This was constructed without the
benefit of a TRCA permit.
CFN: 60604 - Application #: 1115/18/TOR
Report Prepared by: Anna Lim, extension 5284, email alim@trca.on.ca
For information contact: Mark Rapus, extension 5259, email mrapus@trca.on.ca
Date: February 6, 2019
TERMINATION
ON MOTION from Dipika Damerla, the meeting terminated at 11:05 a.m. on Friday, March 1,
2019.
Jennifer Innis
Chair
/af
John MacKenzie
Secretary -Treasurer