HomeMy WebLinkAbout07-19_Minutes_Executive_Committee_2019-09-06Toronto and Region
Conservation
Authority
Executive Committee Meeting #7/19 was held at TRCA Head Office, on Friday, September
6, 2019. The Chair Jennifer Innis, called the meeting to order at 9:34 a.m.
PRESENT
Jennifer Innis
Chair
Paul Ainslie
Member
Ronald Chopowick
Member
Joanne Dies
Member
Paula Fletcher
Member
Gordon Highet
Member
Linda Jackson
Member
ABSENT
Jennifer Drake
Member
Jack Heath
Vice -Chair
Dipika Damerla
Member
Cynthia Lai
Member
Anthony Perruzza
Member
The Chair recited the Acknowledgement of Indigenous Territory.
RES4690/19 -
Moved by:
Seconded by:
MINUTES
Ronald Chopowick
Joanne Dies
THAT the Executive Committee approves the minutes of meeting #6/19, held on July 5,
2019.
CARRIED
RES.#B91/19 - MOTION TO AMEND THE AGENDA
Moved by: Linda Jackson
Seconded by: Paul Ainslie
THAT Item 10.3 — Funding and Grants Program report be added to the agenda.
CARRIED
1
Section I — Items for Board of Directors Action
RES.#692/19 - REQUEST FOR PROPOSAL FOR 2019 SLOPE STABILITY AND
EROSION RISK ASSESSMENTS WITHIN CITY OF TORONTO
Award of Request for Proposal (RFP) No. 10020502 to undertake
geotechnical investigations to complete various slope stability and erosion
risk assessments for multiple private properties within the City of Toronto.
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a project that
requires the services of professional geotechnical engineering consultants;
AND WHEREAS TRCA solicited proposals through a publicly advertised process and
evaluated the proposals based on the technical and financial criteria;
AND WHEREAS staff was subsequently authorized at Authority Meeting #7/19 under
Resolution #A143/19 to commence with the said investigation;
THEREFORE LET IT BE RESOLVED THAT Request for Proposal (RFP) No. 10020502 for
2019 Slope Stability and Erosion Risk Assessments Within City of Toronto be awarded to
the following consultants KGS Group Inc. (Section 1 — East Toronto Sites), AECOM Canada
Ltd. (Section 2 — Parkview Hill Crescent and Welby Circle), Terraprobe Inc. (Section 3 —
West Toronto Sites) and Frontop Engineering Ltd (LTSSC Update Sites);
THAT TRCA staff be authorized to approve additional expenditures to a maximum of
$67,928.00 (approximately 15% of the project cost), plus applicable taxes, in excess of the
contract cost as a contingency allowance if deemed necessary;
THAT should TRCA staff be unable to negotiate a contract with the above-mentioned
proponents, staff be authorized to enter into and conclude contract negotiations with other
Proponents that submitted proposals, beginning with the next highest ranked Proponent
meeting TRCA specifications for each section;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals and
the signing and execution of any documents.
CARRIED
BACKGROUND
TRCA has been inventorying, assessing and remediating erosion hazards for more than 30
years under various program names and special projects. In recent years, intensifying storm
events such as the July 8, 2013 severe storm, the May 2017 severe rain event, and the high Lake
Ontario water levels along the waterfront in 2019 have resulted in more frequent widespread
flooding, surcharges of water infrastructure, debris jams, damage to river and valley systems
including extensive damage to park trails and pedestrian bridges, and an unprecedented number
of slope failures on hundreds of private properties that border these natural areas. The result of
these intensifying and more severe weather events has been a significant increase in the number
of erosion hazard sites in the City of Toronto which are awaiting assistance through TRCA's
Erosion Risk Management Program (ERMP). Through this long-standing program, TRCA
supports our municipal partners to effectively deal with the effects of climate change by
implementing cost-effective solutions to protect essential infrastructure.
Prioritization of sites under the Valley Erosion Hazard portfolio for implementation is based on the
level of risk to essential structures (i.e. dwellings) and risk to the public safety. TRCA's Erosion
Risk Management staff complete inspections throughout the City of Toronto annually and all
erosion hazard sites are then prioritized for a detailed slope stability and erosion risk assessment
to determine the extent of the risk to essential structures. Only the highest scoring sites will be
proposed to be studied in detail every year due to the number of active sites and limited program
funding as TRCA also plans & implements remedial erosion control works at the highest risk sites.
The services of professional geotechnical engineering consultants are required to complete slope
stability and erosion risk assessments at various erosion hazard sites across the City of Toronto.
These services are also required to review existing subsurface information and previous studies
to complete a detailed slope stability analysis to ensure the erosion hazard sites are being
prioritized for assistance using the same parameters.
The sites are located throughout the City of Toronto and have been organized within the RFP into
four (4) sections due to their geographic location and scope of work. In addition, the sites within
the RFP were divided into four sections to ensure that the geotechnical investigations will be
completed simultaneously using multiple consultants and borehole drilling subcontractors to
maintain schedule. Section 1 - East Toronto Sites includes 40 private properties, Section 2 -
Parkview Hill Crescent and Welby Circle includes 65 private properties, Section 3 - West Toronto
Sites includes seven private properties, and Section 4 - LTSSC Update Sites includes 75 private
properties. The properties included in these four different sections have been brought to TRCA's
attention by Erosion Risk Management staff while in the field, private property owners that have
noticed signs of erosion on their property, and by desktop review and analysis of other information.
Site specific details are described in Attachment 1. Some in -year adjustments to the proposed
sites may be required due to delays with property owner negotiations, owner opt -outs, and other
factors.
RATIONALE
RFP documentation was posted on the public procurement website www.biddingo.com on July 3,
2019 and closed on August 2, 2019. Three (3) addendums were issued to respond to questions
received. A total of forty-five (45) firms downloaded the documents and eight (8) proposals were
received from the following Proponent(s) with the respective sections bid upon:
• AECOM Canada Ltd.
• EXP Services Inc.
• Frontop Engineering Ltd.
• Geomaple Geotechnics Inc.
• HLV2K Engineering Ltd.
• KGS Group Inc.
• Soil Engineers Ltd.
• Terraprobe Inc.
The proposals from EXP Services Inc. (Sections 1-4), Soil Engineers Ltd. (Sections 2-4) and
Geomaple Geotechnics Inc. (Sections 1-3) did not meet the minimum score of 60 out of 85
percentage for technical criteria and were not evaluated further.
An Evaluation Committee comprised of staff from the Engineering Projects group reviewed the
technical and financial proposals. In addition, TRCA's Senior Geotechnical engineer reviewed
the scope of work and drilling program for the more involved sections to confirm the approach
proposed is appropriate. The criteria used to evaluate and select the recommended Proponents
included the following:
Criteria
Weight (%)
Minimum Score
Conformance with the terms of
he RFP
10
Expertise, qualifications, and
availability of project team
15
Similar projects — scope and
magnitude
10
Understanding of project and
scope of work
15
Sub -Total Technical
85
60
Pricing (Reasonableness of
cost
15
Sub -Total Pricing
15
Total Points
100
Through the evaluation process, it was determined that KGS Group Inc. is the highest ranked
vendor for Section 1, AECOM Canada Ltd. for Section 2, Terraprobe Inc. for Section 3, and
Frontop Engineering Ltd. for Section 4. All of these firms met the qualifications and
requirements set out in the RFP. Therefore, staff recommends the award of contract No.
10020502 to KGS Group Inc., AECOM Canada Ltd., Terraprobe Inc. and Frontop Engineering
Ltd. Proponent's scores and staff analysis of the evaluation results can be provided in an in -
camera presentation, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 2 — Manage our regional water resources for current and future generations
FINANCIAL DETAILS
Based upon a review of previous geotechnical investigations completed for various private
properties within City of Toronto, the anticipated costs for the requested services are
approximately $500,000.00. An increase or decrease in workload and potential property owner
opt -outs will have an impact on the value of this contract. All vendors understand both the
potential cost and resource implications associated with changes in workload.
Funds for the contract are identified in the 2019 Valley Erosion Hazard budget funded by City of
Toronto. The investigation was approved as part of the 2019 workplan authorized at Authority
Meeting #7/19 under Resolution #A143/19. The cost of executing this contract, including all staff
time and associated costs to manage the project, are charged to account 133-03.
Report prepared by: Ilona Lehtokoski, extension 5509
Emails: iIona. lehtokoski@trca.ca
Report approved by: Matt Johnston, extensions 5525
Date: September 6, 2019
Attachments: 2
Attachment 1: Proposed 2019 Geotechnical Investigation Sites within City of Toronto
Attachment 2: Key Map of Proposed 2019 Geotechnical Investigation Sites within City of
Toronto
Attachment 1 — Proposed 2019 Geotechnical Investigation Sites
n
Site
11 Properties Proposed for
Number of
Site Details
Geotechnical Investigation
Properties
This site will no longer be awarded in this contract as
1
220 Bartley Drive
1
geotechnical investigation will be completed as part of
another Request for Proposal to expedite this site.
5-7, 16 Parkview Avenue, 472
Homeowners notified TRCA of erosion issues following the
2
Wellesley Street East and
5
severe rainfall event in May 2017.
Wellesley Park
The site was flagged to TRCA by homeowners after the
3
525-555 Donlands Avenue
16
July 8, 2013 severe weather event and through desktop
review.
4
2-6 Moorehill Drive and 30-36
7
The properties along Moorehill Drive and Bennington
Bennington Heights Drive
Heights Drive were flagged by desktop review.
5
Burke Brooke
3
The properties within Burke Brooke were flagged by
desktop review.
6
36 Glengrove Avenue East
1
This site was identified during a site visit by TRCA staff in
Spring 2019.
20-38 Restwell Crescent, 6-8
The site was flagged to TRCA by City of Toronto staff and
7
Courtwood Place and 15-21
14
through desktop review.
Viamede Crescent
Erosion concerns at 96 and 98 Parkview Hill Crescent were
94-224 H
Parkview Hill Crescent
identified to TRCA during Spring 2019. Due to the proximity
2
8
and 1-5 Circle
65
of the slope to the private properties, TRCA extended the
study area to encompass majority of the northern section of
Parkview Hill Crescent and Welby Circle.
9
32-34 Hertford Avenue
2
Homeowners notified TRCA of erosion issues in 2016.
10
108-110 Culford Road
2
The site was flagged to TRCA by City of Toronto staff.
3
11
21 Sunnybrae Crescent
1
The property was flagged by desktop review.
12
26 Kennerly Court
1
The property was flagged by desktop review.
13
144 Stilecroft Drive
1
The property was flagged by desktop review.
1
2-50 Meadowcliffe Drive
11
While previous geotechnical assessments have been
completed for this site, TRCA constructed a shoreline
structure and an updated SS&ERA is recommended
2
767 Royal York Road
1
Previous SS&ERAs were completed between 2014 and
2015 for these sites, however an updated Long -Term
Stable Slope Crest (LTSSC) with Factor of Safety of 1.3 is
recommended.
3
323 Riverview Drive
1
4
10 Burnhamthorpe Crescent
1
5
12 King George's Drive
1
6
49 Collingdale Road
1
7
161-167 Grandravine Drive
4
This site will no longer be awarded in this contract as
geotechnical investigation will be completed part of another
Request for Proposal to expedite this site.
4
8
4-8 Earldown Drive
3
Previous SS&ERAs were completed between 2014 and
2015 for these sites, however an updated Long -Term
Stable Slope Crest (LTSSC) with Factor of Safety of 1.3 is
recommended.
9
66-70 Celeste Drive
3
10
108 Hardian Drive
1
11
75 Strathavon Drive
1
12
21-23 Hackmore Avenue
2
13
87 & 101 Bankview Circle
2
14
5-61 Moon Valley Drive
21
15
24-36 Watercliffe Drive
7
16
28-30, 62-64 Topbank Drive
4
17
4 Hardwood Gate
1
18
32-40 Esther Lorrie Drive
4
19
100 North Drive
1
20
17 Treeline Court
1
21
30 Grovetree Road
1
400
a7
I
1
0 4og1
0 12,1
0407
409
0 _
427
O
OEWf/
Lake Ontario
Legend Toronto and Region
�� Conservation DURHAM
Assessments YORK
Authority
AA PEEL
TORONTO
0 �.xe o�reno
RES.#B93/19 - REQUEST FOR TENDER FOR CONSTRUCTION SERVICES FOR
BEAUCOURT ROAD (12-30) MAJOR MAINTENANCE PROJECT
Award of Request for Tender (RFT) No. 10020533 for the supply of all
labour, equipment and materials necessary to repair a TRCA-owned
retaining wall along Mimico Creek for the Beaucourt Road (12-30) Major
Maintenance Project in the City of Toronto.
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a project
that requires bank stabilization works including slope restoration and erosion control
structure maintenance;
AND WHEREAS TRCA solicited tenders through a publicly advertised process;
THEREFORE THE EXECUTIVE COMMITTEE RECOMMENDS THAT Request for Tender
(RFT) No. 10020533 for the Beaucourt Road (12-30) Major Maintenance Project be
awarded to 560789 Ontario Ltd. o/a R&M Construction at a total cost not to exceed
$818,313.00 plus applicable taxes, to be expended as authorized by Toronto and Region
Conservation Authority (TRCA) staff;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of
$164,000.000 (approximately 20% of the project cost), plus applicable taxes, in excess of
the contract cost as a contingency allowance if deemed necessary;
THAT should TRCA staff be unable to negotiate a contract with the above-mentioned
proponent, staff be authorized to enter into and conclude contract negotiations with
other Proponents that submitted quotations, beginning with the next lowest bid meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals
and the signing and execution of any documents.
CARRIED
BACKGROUND
In 1983, TRCA constructed a 152 -metre -long gabion basket retaining wall along Mimico Creek
along the toe of the slope below Beaucourt Road in Berry Road Park. In April 2009, a partial
failure of the retaining wall (approximately 50 meters) occurred along the toe of the slope below
12 — 20 Beaucourt Road.
In 2011, TRCA undertook construction of an armourstone retaining wall to replace the failed
section of gabion baskets below Beaucourt Road. From 2014 to 2016, TRCA monitoring
inspection records noted severe displacement of armourstones from the wall constructed in
2011, in addition to slumping, scouring, and water seepage at the site. It is suspected the
substantial flows from the July 8, 2013 severe weather event in the Greater Toronto Area were
the cause of the failure, based on the timing of the deficiencies recorded in the following
years. This site was subsequently ranked as a high priority for maintenance work due to the
height of the slope, and proximity of the dwellings and rear yard structures to the slope crest.
In May 2017, the detailed design contract for major maintenance work was awarded
to Ecosystem Recovery Incorporated (ERI). The proposed design prepared by ERI includes
replacement of the failed section of the armourstone retaining wall, replacement of a failing
section of gabion basket retaining wall, reinforcement of the channel bed, and energy deflection
away from the outer bank. To increase the stability of the replacement armourstone retaining
wall, it will be secured to the face of the valley slope using a tie -back system.
RATIONALE
A Request for Pre -Qualification (RFPQ) for general contractors was publicly advertised on the
public procurement website www.biddingo.com on May 8, 2019 and closed on May 24, 2019 at
11:00 AM. General contractors interested in pre -qualifying were advised that in order to receive
a tender package they must meet the following criteria:
• Submission of a complete pre -qualification package
• Past experience in the construction of similar erosion control projects
• Ability to meet construction schedule milestones and ability to coordinate work by others
• Value of completed work and experience dealing with projects with construction budgets
of approximately $1.2 million
• Resumes of key personnel
• Positive feedback received from references provided by the contractor on their CCDC 11
— 2018 Form as well as internal TRCA references, where applicable
Five (5) pre -qualification submissions were received from the following Proponent(s):
• 2220742 Ontario Ltd. o/a Bronte Construction
• 560789 Ontario Ltd. o/a R&M Construction
• 614128 Ontario Ltd. o/a Trisan Construction
• CSL Group Ltd.
• Dynex Construction Inc.
An Evaluation Committee comprised of staff from the Engineering Projects Business Unit
reviewed the pre -qualification documents against the criteria above. Based on the evaluation
results, Request for Tender documents were issued on July 31, 2019 to the following five (5)
Proponent(s):
• 2220742 Ontario Ltd. o/a Bronte Construction
• 560789 Ontario Ltd. o/a R&M Construction
• 614128 Ontario Ltd. o/a Trisan Construction
• CSL Group Ltd.
• Dynex Construction Inc.
A mandatory meeting and site tour was held on August 7, 2019 and The RFT closed on August
14, 2019.
One (1) addendum was issued to respond to questions received.
The Procurement Opening Committee opened the Tenders on August 14, 2019 with the
following results:
Proponent
Fee (Plus HST)
560789 Ontario Ltd. o/a R&M
$818,313.00
Construction
Dynex Construction Inc.
$1,165,250.00
2220742 Ontario Ltd. o/a Bronte
$1,459,319.00
Construction
614128 Ontario Ltd. o/a Trisan
$2,514,750.00
Construction
Staff reviewed the bid received from 560789 Ontario Ltd. o/a R&M Construction against its own
cost estimate and has determined that the bid is of reasonable value and meets the
requirements as outlined in the RFT documents. Therefore, it is recommended that contract No.
10020533 be awarded to 560789 Ontario Ltd. o/a R&M Construction at a total cost not to
exceed $818,313.00 plus 20% contingency, plus applicable taxes, it being the lowest bid
meeting TRCA's specifications.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priorities set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 2 — Manage our regional water resources for current and future generations
This project provides continued investment in erosion control infrastructure built and maintained
by TRCA for protection of the integrity and health of Mimico Creek.
FINANCIAL DETAILS
Funds for the contract are identified in the 2019 City of Toronto capital budget for major
maintenance of TRCA-owned erosion control infrastructure. The cost of executing this contract,
including all staff time and associated costs to manage the project, is being tracked under
account #134-05.
Report prepared by: Nivedha Sundararajah, extension 5528
Emails: nivedha.sundararaiah(cDtrca.ca
For Information contact: Nivedha Sundararajah, extension 5528
Emails: nivedha.sundararaiah(cDtrca.ca
Date: August 14, 2019
Attachments: 1
Attachment 1: Key Map
RES.#B94/19 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Flood Plain and Conservation Component, Duffins Creek Watershed
711371 Ontario Corp. (CFN 61809). Acquisition of property located north
of Webb Road and west of Brock Road, municipally known as 2549
Concession Road 4, in the Township of Uxbridge, Regional Municipality
of Durham, under the "Greenlands Acquisition Project for 2016-2020,"
Flood Plain and Conservation Component, Duff ins Creek watershed.
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
THE EXECUTIVE COMMITTEE RECOMMENDS THAT 3.13 hectares (7.735 acres), more or
less, of vacant land, located north of Webb Road and west of Brock Road, said land
being Part of Lot 8, Concession 4, designated as Block 8 on preliminary M -Plan prepared
by Lloyd & Purcell, Job No: 16-648, municipally known as 2549 Concession Road 4, in
the Township of Uxbridge, Regional Municipality of Durham, be purchased from 711371
Ontario Corp.;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the
land free from encumbrance, subject to existing service easements;
THAT the firm Gardiner Roberts LLP, be instructed to complete the transaction at the
earliest possible date and all reasonable expenses incurred incidental to the closing for
land transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the
Greenlands Acquisition Project for 2016-2020.
Negotiations have been conducted with the owner's external legal counsel, HHL Law Firm, LLP
Access to the subject lands will be achieved through its frontage off Newtown Reed Crescent
and adjoining TRCA owned parcels.
Attached is a sketch illustrating the location of the subject lands
RATIONALE
At Authority Meeting #7/16, held on September 23, 2016 Resolution #At 52/16 was approved,
authorising the acquisition of approximately 11.162 hectares (27.851 acres) of land, being
Phase 1 of the development of the site. The subject lands comprise the second phase of the
redevelopment of the property and are adjacent to, and connect, the acquired lands under
Phase 1.
The subject lands fall within TRCA's approved master plan for acquisition for the Duffins Creek
watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Ontario
Municipal Board proceedings, File Number PL956309, issued on March 26, 2013 for a Draft
Plan of Subdivision 18T-97020 for residential development, established the limits of the open
space land.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
TAXES AND MAINTENANCE
Based on TRCA's preliminary review of the environmental criteria for lands that are eligible to
receive a property tax exemption under the provincial Conservation Land Tax Incentive
Program, the subject property should be eligible for a tax exemption. While it is expected that
the subject parcel of land will not significantly impact TRCA's maintenance costs at this location,
an assessment of the aggregate acquisitions in the area will be undertaken and the results will
be integrated into TRCA's land management program and associated budgets.
FINANCIAL DETAILS
Funds for the costs related to this purchase are available in the TRCA land acquisition capital
account.
Report prepared by: Mike Ferning, extension 5223
Emails: mike.fenning@trca.ca
For Information contact: Mike Ferning, extension 5223
Emails: mike.fenning@trca.ca
Date: July 30, 2019
Attachments: 2
Attachment 1: Site plan
Attachment 2: Orthophoto
F -AW .L rTSCaifMR&Ria9F7i
Subject
Property
West (viis'G12e/
r•
1xon C�eK
Legend �� Toronto and Region SITE
0 Conservation YORK H
DURHAM
Authority
••• �PEEL
N TORONTO
..xe oerene
RES.#B95/19 - REQUEST FOR A CONVEYANCE, CITY OF TORONTO, HUMBER
RIVER WATERSHED
Receipt of a request from the City of Toronto, for a conveyance of
Toronto and Region Conservation Authority -owned lands located at the
rear of 61 Claireville Drive, east of Highway #27 and north of Finch
Avenue West in the City of Toronto, required for maintenance of an
existing storm water management pond, Humber River watershed (CFN
22577).
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request
from the City of Toronto for the conveyance of TRCA-owned lands located at the rear of
61 Claireville Drive, east of Highway #27 and north of Finch Avenue West in the City of
Toronto, required for maintenance of an existing storm water management pond, Humber
River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Toronto in
this instance;
THEREFORE THE EXECUTIVE COMMITTEE RECOMMENDS THAT a parcel of TRCA-
owned land containing 1.94 hectares (4.8 acres), more or less, of vacant land, required
for maintenance of an existing storm water management pond, Part Lots 37 & 38,
Concession 4, designated as Parts 1-9 (inclusively), Plan 66R-18925 in the City of
Toronto, be conveyed to the City of Toronto;
THAT consideration be the nominal sum of $2.00; all legal, survey and other costs to be
paid by the City of Toronto;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
The City of Toronto has requested the conveyance of TRCA-owned lands located at the rear of
61 Claireville Drive, east of Highway #27 and north of Finch Avenue West in the City of Toronto,
required for maintenance of an existing storm water management pond, Humber River
watershed.
The subject TRCA-owned lands were acquired from Trustees of Bochasanwasi Shri Akshar
Purushottamni Sanstha (Trustees), on February 23, 2001 under the Greenspace Protection and
Acquisition Project 1996-2000. The Trustees retained an easement on the property for
maintenance of the storm water management pond. The Trustees have requested that the City
assume the responsibility for maintenance the pond and city staff has agreed subject to the City
owning the land.
Attachment 1 is a sketch illustrating the location of the subject lands. Attachment 2 is an
orthophoto illustrating the location of the subject lands.
RATIONALE
The City of Toronto has conveyed lands to TRCA over the years for nominal consideration of
$2.00 and has requested that TRCA lands required for an existing storm water management
pond, be conveyed for a nominal consideration of $2.00.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
The City of Toronto has agreed to assume all legal, survey and other costs involved in
completing this transaction.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewong(aDtrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Mike Ferning, extension 5223
Emails: ewong(a)trca.on.ca, mfenning(cDtrca.on.ca
Date: August 9, 2019
Attachment 1: Site Plan
Attachment 2: Orthophoto
;H��11L411MIG INOMMI,
\ :...... .... - 427 � -
Legend
L�
Pl-
/fe� Toronto and Region
Conservation
Authority
Fa
PEEL'
Lake OntaHa
RES.#B96/19 - REQUEST FOR RELEASE OF PORTION OF ACCESS EASEMENT
360 19T" Avenue, City of Richmond Hill, Regional Municipality of York
(CFN 49466). Receipt of a request from the Regional Municipality of York
and Hai Xia Cao for TRCA to release a portion of an access easement, in
the City of Richmond Hill, Regional Municipality of York, Rouge River
Watershed.
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
WHEREAS TRCA is in receipt of a request from the Regional Municipality of York and Hai
Xia Cao to release a portion of an access easement in favour of TRCA affecting land
being transferred from Hai Xia Cao to the Regional Municipality of York and in the City of
Richmond for a road widening;
AND WHEREAS it is in the best interests of TRCA in furthering its objectives, as set out
in Section 20 of the Conservation Authorities Act to cooperate with the Regional
Municipality of York and Hai Xia Cao in this instance;
THEREFORE THE EXECUTIVE COMMITTEE RECOMMENDS THAT TRCA enter into an
agreement with the Regional Municipality of York and Hai Xia Cao for the release of the
access easement containing 0.004 hectares (0.009 acres), more or less, said land being,
Part of the South Half of Lot 56, Concession 1 and designated as Part 27, Plan 65R-38442,
City of Richmond Hill, Regional Municipality of York;
THAT Hai Xia Cao is responsible for all legal, survey and other costs incurred by TRCA;
AND FURTHER THAT the appropriate TRCA officials be authorized and directed to take
whatever action may be required to give effect hereto, including the obtaining of
necessary approvals and the execution of any documents.
CARRIED
BACKGROUND
The Regional Municipality of York and Hai Xia Cao has requested for TRCA to release a portion
of an access easement (subject property), in the City of Richmond Hill, Regional Municipality of
York.
The subject property (i.e., Part 27, Plan 65R-38442) is a part of an access easement acquired
on October 8, 2014.
The owner of 360 19'" Avenue, Hai Xia Cao has made a consent application (i.e. 8045/18) to
City of Richmond Hill. A condition of the consent application is to transfer lands to the Regional
Municipality of York for future road widening of 19"' Avenue. As part of the transfer, the
Regional Municipality of York requires the title to be clear of any encumbrance including TRCA's
access easement granted on October 8, 2014.
TRCA will continue to have access after the release access easement on the subject property
as the subject property once transferred to the Regional Municipality of York is deemed to be a
public road pursuant to the Municipal Act s.31(6).
Attachment 1 is a sketch illustrating the location of the subject lands. Attachment 2 is an
orthophoto illustrating the location of the subject lands.
RATIONALE
This transaction assists the Regional Municipality of York with regional infrastructure
improvements.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
This transaction will be for a nominal consideration of $2.00. Hai Xia Cao is responsible for all
legal, survey and other costs with the releasing of portion of the access easement.
Report prepared by: Edlyn Wong, extension 5711
Emails: ewong(aitrca.on.ca
For Information contact: Edlyn Wong, extension 5711, Mike Fenning, extension 5223
Emails: ewong(a)trca.on.ca, mfenning(abtrca.on.ca
Date: August 13, 2019
Attachments: 2
Attachment 1: Site Plan
Attachment 2: Orthophoto
ee�v t7� t w4
Roo,.... a •.
. R
�r
777
..........•
Subject•'
Property
Legend
Toronto and Region
Conservation*DURHAMAuthority
Section II — Items for Executive Action
RES.#B97/19 - APPOINTMENT OF ENFORCEMENT OFFICER
Recommended appointment of one Enforcement Officer for the purpose of
signing authority in the administration of the Development, Interference
with Wetlands and Alterations to Shorelines and Watercourses Regulation
(Ontario Regulation 166/06, as amended).
Moved by: Gordon Highet
Seconded by: Ronald Chopowick
THAT Anthony Sun be appointed as Enforcement Officer for the purposes of Section 3(3)
of the Development, Interference with Wetlands and Alterations to Shorelines and
Watercourses Regulation (Ontario Regulation 166/06, as amended) by the Board of
Directors of the Toronto and Region Conservation Authority (TRCA), pursuant to Section
28 of the Conservation Authorities Act.
CARRIED
BACKGROUND
The Conservation Authorities Act provides for a conservation authority to appoint enforcement
officers. Ontario Regulation 166/06 provides for the executive committee, or one or more
employees of the Authority, to be designated for the purposes of granting of permissions pursuant
to Section 28 of the Act. These appointments will provide for the delegation of authority to staff for
authorizing the issuance of permits approved by the Executive Committee under the Regulation.
Staff delegated with this responsibility historically consists of our Chief Executive Officer and
senior staff members within our Development and Engineering Services Division (Director,
Associate Directors, Senior Managers, Managers, Senior Planners).
RATIONALE
Mr. Anthony Sun has recently been appointed to the position of Senior Planner within the
Development and Engineering Services Division, and responsible for oversight and supervision of
staff associated with the review and approval of applications. The recommended appointment as
Enforcement Officer will allow him to authorize the issuance of approvals for the work that he
supervises.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built environment
Strategy 7 — Build partnerships and new business models
Strategy 9 — Measure performance
Report prepared by: Quentin Hanchard, extension 5324
Emails:guentin.hanchard(g)trca.ca
For Information contact: Quentin Hanchard, extension 5324
Emails:guentin.hanchard(a)trca.ca
Date: August 8, 2019
Section III — Items for the Information of the Board
Q2 COMMUNICATIONS SUMMARY
Educational report regarding Toronto and Region Conservation
Authority's (TRCA) corporate media communication activities during the
second quarter of 2019 (April - June).
Moved by: Linda Jackson
Seconded by: Joanne Dies
IT IS RECOMMENDED THAT the Q2 Communications Summary report be received.
CARRIED
BACKGROUND
The Communications and Events business unit carries out corporate communications programs
to provide TRCA with a unified voice that aligns consistently with strategic priorities, and
monitors results to identify opportunities for improvements. Working with internal staff from
across all divisions, in addition to external program and service providers, the business unit
delivers communications campaigns through traditional media outlets and online media
channels. Content dissemination through traditional media channels typically involves
development and distribution of materials such as news releases and media advisories, direct
outreach to targeted journalists, producers and editors, and responses to incoming media
inquiries. Digital campaigns typically involve posting of visual and written content on websites
and distribution of content via social media platforms. All media activity is supported by ongoing
assessment and deployment of technology tools and management processes to maximize
effectiveness. While TRCA produces communications materials for multiple programs and
projects managed by business units across the organization, this report provided in Attachment
1 focuses on the most notable media coverage during the reporting period.
DETAILS OF WORK TO BE DONE
TRCA is preparing new and updated communications policies and protocols to ensure more
streamlined and strategically focused media relations. These new approaches will include clear
protocols for Board Members and staff on who to involve for media inquiries, targets and
performance indicators such as the number of proactive media releases, along with information
on the number of inquiries and associated response times.
Report prepared by: Rick Sikorski, extension 5414
Emails: rsikroski(&trca.on.ca
For Information contact: Rick Sikorski, extension 5414
Emails: rsikorski(dtrca.on.ca
Date: September 6, 2019
Attachments: 1
Attachment 1: Notable TRCA Media Coverage: April — June 2019
Attachment 1: Notable TRCA Media Coverage: April —June 2019
During the second quarter of 2019 TRCA media coverage focused on the following: (select examples of
media coverage follow)
Media Activity in Response to High Lake Ontario Water Level Event
On April 30, 2019, TRCA Flood Risk Management staff issued a Shoreline Hazard Warning as the Lake
Ontario water level at Fisheries and Oceans Canada's tidal observation station in Toronto approached
75.5 metres. The water level continued to rise above normal levels, until it peaked on May 30 and then
began to recede throughout June and beyond. During this high Lake Ontario water level event, TRCA
Flood Risk Management spokesperson Rehana Rajabali and TRCA Government and Community Relations
Specialist, Nancy Gaffney, gave over 40 interviews regarding the Shoreline Hazard Warning and how
TRCA staff were assisting the City of Toronto Island with flood protection on Toronto Island and along
Toronto's waterfront shoreline.
Throughout the event, TRCA media relations staff liaised with City of Toronto strategic communications
staff to coordinate and assign media requests. It was decided that TRCA would speak to water levels,
flood conditions and how it was working with the City of Toronto, while City of Toronto staff took media
interviews about what the City was doing on the ground to address flooding.
The following is a list of selected highlights of media interviews completed during the high Lake Ontario
water level event:
• CBC Metro Morning — On April 29, 2019, Rehana Rajabali, Senior Manager, Flood Risk
Management, was interviewed live on the air about the rising Lake Ontario water levels.
• CityNews Toronto — On April 30, 2019, Rehana Rajabali was interviewed by CityNews Toronto TV
about the rising Lake Ontario water levels.
• CBC.ca — On May 26, 2019, Rehana Rajabali was interviewed regarding the shoreline hazard
warning and the lake level compared to 2017.
• Multiple media outlets— On May 24, 2019, Nancy Gaffney represented TRCA at the City of
Toronto's press conference regarding flooding on Toronto Island. She answered select questions
the lake level and how TRCA worked with the City of Toronto to address flooding on the island.
• Multiple media outlets— On May 29, 2019, Rehana Rajabali represented TRCA at the City of
Toronto's press conference concerning flooding on Toronto Island. She answered select
questions regarding the lake level and how TRCA worked with the City of Toronto to address
flooding on the island.
Flood Risk Management
Severe weather and flooding continued to be popular news topics. Media responded to TRCA watershed
statements (outside of the shoreline hazard warning) with interest in learning about the potential for
flooding. TRCA staff gave interviews about watershed statements as well as larger interviews regarding
TRCA's overall flood risk management work and flood mitigation recommendations for Toronto Island.
Media coverage included:
• Toronto Life —The magazine's June cover story focused on flooding in Toronto and heavily
featured information gathered from TRCA and interviews with Rehana Rajabali.
• Toronto Star—A major feature story on flooding in Toronto ran on May 21, 2019 and
prominently featured information gathered from TRCA and interviews with Rehana Rajabali.
• Multiple outlets — On April 19, 2019, Rehana Rajabali was interviewed by CP24, CTV News
Toronto and Global News Toronto regarding the flood outlook that was in effect.
• Multiple outlets — On June 20 and June 21, 2019, Rehana Rajabali was interviewed by Toronto
Star and CityNews Toronto regarding the Toronto Island Flood Mitigation Report that had been
presented to the TRCA Board of Directors.
Manulife Paddle The Don
Manulife Paddle The Don is an event that brings together conservationists, business people and
recreationists to traverse and celebrate one of Toronto's most important watersheds, the Don River.
The goal of TRCA media relations efforts for the festival was to increase awareness of the event and the
work that TRCA is doing in the watershed. Media coverage included:
• Toronto.com —The website published an advance overview piece on the event on May 1, 2019.
• DailyHive.com —The website published an advance overview piece on the event on April 9,
2019.
• Global News—Global News reporters paddled the river as part of the event. Coverage of their
experience aired that day.
• CP24 — CP24 attended the event on May 5 and aired coverage from the event that day.
• Fairchild TV— Fairchild TV reporters paddled the river as part of the event. Coverage of their
experience aired that day.
• CBC News Toronto— CBC attended the event on May 5 and aired coverage from the event that
day.
Additional notable media coverage
Media expressed interest in a number of other TRCA projects and activities during this quarter, with
TRCA staff completing interviews on a wide range of initiatives. Highlights of additional media coverage
TRCA received included:
• CBC News — On April 10, 2019, CBC News Toronto attended a Public Information Centre for The
Meadoway, and interviewed project lead, Lisa Turnbull, about the initiative and the public
consultation being done by TRCA. The segment aired that evening, and clips from the interview
also ran on CBC Metro Morning on April 11. An online news article was also written about the
project based on the interview and ran on April 11.
• Breakfast Television — On April 29, 2019, Breakfast Television broadcasted four live hits from
Black Creek Pioneer Village. The live hits promoted programming at Black Creek Pioneer Village
and featured interviews with staff members and demonstrations of historic trades, Victorian
fashion, feeding farmyard animals and more.
• CTV News —On June 11, CTV News Toronto broadcasted five live hits from Heart Lake
Conservation Park in support of TRCA's Learn to Fish Program. The segments featured
interviews and fishing demonstrations with TRCA staff and promoted the program and the
conservation park.
• CTV News — On May 2, 2019, CTV News Toronto broadcasted five live hits from Kortright Centre
for Conservation in support of the Four Winds Kite Festival. The segments featured the host
interviewing staff and flying kites to promote the festival.
• Global News Toronto — On June 27, 2019, Global News broadcasted a piece on the history and
importance of the Leslie Spit and Tommy Thompson Park as part of its "YYZ Why" series. The
piece featured an interview with Andrea Chreston, Project Manger at Tommy Thompson Park,
and promoted the property and the activities available there.
• NRU Publishing—On May 1, 2019, NRU Publishing published a piece on TRCA's ecosystem
compensation guidelines, and interviewed Noah Gaetz, Senior Manager, Research and
Knowledge Management for the article.
• Brampton Guardian —On April 3, 2019, TRCA and Infrastructure Canada hosted an
announcement at Professor's Lake Recreation Centre in Brampton. The event was to announce
that Infrastructure Canada was contributing $22.31 million to the Toronto Region Ravine Erosion
Management and Hazard Mitigation Project through its Disaster Mitigation and Adaptation
Fund. Brampton Guardian came out to cover the event and posted an article about the
announcement on April 12, 2019.
Other notable developments communicated via TRCA channels:
• Infrastructure Canada announces it will provide $22.31 million to the Toronto Region Ravine Erosion
Management and Hazard Mitigation Project. https://trca.ca/news/erosion-protection-toronto-york-
eel
• Lieutenant Governor Helps TRCA Launch Humber River Celebration. httos://trca.ca/news/lieutenant-
governor-h u m ber-rive r -celebration/
• TRCA hosts groundbreaking ceremony for new head office. https://trca.ca/news/new-trca-head-office-
sustainable-design/
• TRCA transfers land to Parks Canada for Rouge National Urban Park. https://trca.ca/news/land-
transfer-rouge-national-urban-park/
Select TRCA Media Coverage: April — June 2019
CityNews Toronto, April 30, 2019
Full video and article: https://toronto.citynews.ca/2019/04/30/shoreline-hazard-warning-in-effect-for-
lake-onta rio-as-water-levels-rise/
CrtyAkN41s
Shoreline hazard warning in effect for Lake Ontario as wafter levels rise
BY NEWS STAFF, THE CANADIAN Fz.
The Toronto and Region Conservation Authority (TRCA) has issued a shoreline hazard
warning for areas along Lake Ontario as water levels are projected to continue rising until late
May or early June.
When the Toronto Islands flooded in 2017, water levels in Lake Ontario reached a peak of 75.93
metres, the TRCA said. The current water level is approaching 75.5 metres.
Making matters worse, high wind gusts of up to 60 km/h are expected to produce offshore
waves reaching two metres on Wednesday.
The rising water levels could contribute to erosion along the Lake Ontario shorelines and
waterfront communities could experience flooding.
CBC News Toronto, May 26, 2019
Full article: https://www.cbc.ca/news/canada/toronto/toronto-shoreline-warning-continues-water-
levels-1.5150472
N0I► CBC
Toronto under shoreline hazard warning as lake water edges closer to 2017 levels
Muriel Draaisma CBC News - Posted: May 26, 2019 3:49 PM ET I Last Updated: May 26
Toronto remains under a shoreline hazard warning as water levels in Lake Ontario edge
closer to a historic high reached two years ago.
The Toronto and Region Conservation Authority says Lake Ontario's current average
water level is 75.86 metres above sea level, about 7 centimetres below the maximum
level reached in 2017, when water levels were record high.
Rehana Rajabali, senior manager of flood risk management for the conservation
authority, reminded residents that the shoreline continues to pose a risk, especially
when winds and waves are strong.
Toronto Life, May 23, 2019
Full article: https://torontolife.com/city/the-age-of-the-flood/
On the evening of August 7, 2018, Gavin Odho and his girlfriend, Manuela De Medeiros,
had just gone to bed when a neighbour called the house. "Check your basement," he
said. "The street is flooding." Odho, who's 29 and works as a home renovator, had
bought his bungalow on Hilldale Road near Weston Road and St. Clair two years earlier.
He jumped out of bed and raced down to the basement, where he found a pool of murky
brown water, six inches deep and rising. Water was spurting around the edge of the door
leading to the street, trying to get in. Immediately, Odho and De Medeiros started to
hoist their belongings up the stairs: tools, music equipment, a bed. Odho was turning
back for more when he heard De Medeiros scream. The sheer force of the water had
pushed open the door and the basement was filling rapidly. He slammed the door shut
again and locked the deadbolt. They turned to see if there was anything they could save,
but a wall of water broke through the deadbolt and the door burst open with a bang.
Within seconds, the water had risen to their chests. Stunned, Odho turned off the power
so they wouldn't get electrocuted. Then they half -swam, half -walked to the stairwell and
climbed up to the ground floor to dry out and figure out what to do next.
The small but powerful storm had slipped past rain sensors from the Toronto and
Region Conservation Authority, the agency responsible for warning residents about
floods. It started north of the 401 and inflicted massive damage in Odho's
neighbourhood, Rockcliffe-Smythe, just east of the Humber.
CBC News Toronto, May 5, 2019
Full video and article: https://www.cbc.ca/news/canada/toronto/don-river-toronto-fundraiser-mock-
funeral-1.5123870
Afth
1101, C B C
A funeral was held for the Don River 50 years ago — but now
people are celebrating its progress
Julia Knope • Posted: May 05, 2019 7:11 PM ET I Last Updated: May 5
Paddlers head out on their canoes at an annual event for the Don River, a watercourse which
flows through the city and empties in Lake Ontario at Toronto Harbour. (Talia Ricci/CBC)
It seems as though the tides have turned for this Toronto landmark.
In an environmental demonstration organized by the group Pollution Probe back in
1969, dozens gathered in black attire to mourn the state of the Don River with a funeral.
CBC News Toronto, April 24, 2019
Full article: https://www.cbc.ca/news/canada/toronto/meadoway-scarborough-toronto-park-1.5110164
Afth
II0h CBC
Toronto gets sneak peek at 16 -km urban park that will connect
downtown to Scarborough
The Meadoway will transform hydro corridor into 'amazing meadow full
of all kinds of insects and butterflies'
CBC News - Posted: Apr 24, 2019 10:59 PM ET I Last Updated: April 25
The Meadoway will transform a hydra corridor into an 'amazing meadow full of all kinds of
insects and butterflies,' say organizers. (TRCA)
Dozens of Torontonians turned out to get a sneak peek of the first plans for a 16 -
kilometre long stretch of green space that would see pedestrians and cyclists be able to
make their way from the downtown core up to Scarborough without ever leaving
the park.
Breakfast Television, May 29, 2019
Full video and article: https://www.bttoronto.ca/videos/nicole-live-at-black-creek-pioneer-village-1-of-
1
BREAKFAST
TELEVISION
VIDEOS
Live Eye
Nicole LIVE at Black Creek Pioneer Village (1 of 4)
Nicole learns about Victorian fashion trends and gets a home tour at Black Creek Pioneer Village.
May 29, 2019 08:10
Global News Toronto, June 27, 2019
Full video and article: https://globaInews.ca/video/5440248/vvz-why-why-the-Ieslie-street-spit-was-
originally-created
June 27 200 6:02pm (!) 02:10
YYZ Why?: Why the Leslie Street Spit was
originally created
Pi u,is week's installment of YYZ Why? — It's an "accidc•ltal wilderness" just minutes
from downtown Toronto. Global`s Melanie Zettler visited Tommy Thompson Park at
the height of bird migration to find out why and how this land formation was
Created_
YYZ Why?: why the Leslie Street Spit was originally created
li Publishing, May 1, 2019
1 ECOSYSTEM COMPENSATION
OFFSETTING GROWTH
$
urbanization and
infrastructureexpansion
results in losses to the
province's natural heritage
system, the City of Pickering
is implementing ecosystem
compensation guidelines in its
plannhrgpolici-.
Pickering's planning and
development committee
approved a staff report
recommending that council
implement the Toronto
and Region Conservation
Authority's guidelines for
detemvningecosystem
compensation due to
development impacts. The
guidelines were adopted by the
TRCA executive committee
in June 7018 to ensure any
damageto environmentally_
sensitive areas was offset by a
standardized compensation
formula that wouldprovides
clarity to both the conservation
authority, municipality and
developer.
Pickering will be the
first municipalityto take
those guidelines and we
them as the basis for an
official plan amendment that
addresses ecosystem loss
and compensation due to
development impacts.
Ecosystem compensation
has typically occurred when
the natural features within a
WRachael Williams
municipality are not protected
by federal, provincial or
municipal policy, or when draft
approvals to remove features are
grandfathered from previous
policy regimes.
"Sometimes, to these
discussions with developers,
it would take a long time to
negotiate things. Part ofthe
problem was that there wasrit
an understanding of how
compensation was determined
or how sites are selected....
who makes the decisions.
who collects the money, how
will that money be spent The
guidelines will make that process
as transparent as possible: said
Pickerings principle policy
planner Dian Jacobs.
Developed as part of the
2014 TRCA living City policies,
the ecosystem compensation
guidelines provide a consistent
and streamlined approach
for assessing the loss of
environmentally -significant
features by determining the
total amount of compensation
requaedto replacelost or altered
ecosystems. For example, if a
marshwetland is destroyed
as a resultof a development
or infrastructureproject, the
developer wouldbe responsible
for replacing that wetland
with a similar natural heritage
feature. The project planning
would include sediment and
erosion control, site preparation,
berm Construction, wetland
topography contouringand
grading, habitat structure
installation, planting and seed
application.
Design details are further
broken down into specific
water deptle, number of habitat
structures, terrestrial tree and
shrub plantings as well as a
requirement that 50 per cent
ofthe aquatic area is planted.
The guidelines also suggest
plant species based on specific
site conditions and existing
vegetation. Budget items are
broken down into construction,
terrestrial planting, aquatic
planting and project planning
along with a 10 per cent
contingency fee, all of which are
Subject to market price changes.
"I think it's cam ofilm fust
attempts within Ontario to
Put a scientific approach to
determining Compensation
requirements; said TRCA
research and knowledge senior
CONTAIN UFO 1AOa$�
Awial photograph of Altana Forest,
which the TRCA has Identified as
an omimnmentally signifl can area
in the midst of a sprawling urban
centre.
Nuaoo ToaoNm use emoe COM anneco t
0HOUTi
Aerial photograph of Duffin Creak,
one of the healthiest water streams
that drains Into the north shore Of
Lake Ontoric and correct commum
lies across Durham Region and York
Region.
ale, maoNm.INo amaNcoNSGnnoN
Nommm
WEDNESDAY, MAY 1, 2019 NOVA RES URRIS GREATER TORONTO k HAMILTON AREA 31
OFFSETTING
GROWTH
(I caxnxuEO FROM BASE 4
manager Noah Gaetz.
The guidelines state
compensation should only be
considered if it is determined
that the ecological damage
cannot be avoided minimized
or mitigated fust. The
compensation agreement must
also include the transfer of funds
to a public agency, timeline
for implementation to ensure
the new ecosystem is replaced,
ideally before the impact occurs,
built in warranty periods and
the opportunity for TRCA to
intervene if the work is not being
RESIDENTIAL
OEYEIOPMENEOPPORTONOY
OM LOISLOCAM N TIE NORM OF WOMAN
SEE 33sn
OFICKFEW Natwil .LOAN,PmWwlel
I.SNENNo
IDNMGWAKNn9 AU4R@R031X1(31 WIIW.�s
Cq'-.opro'ea:evl.
SIUW vplremer. unnoe{wwem
LneA^.A9
INALLOI$ sl
LMvaanuas «Nn.ms;n.
WEB NE SOAY, MAY 1, 2019
completed accordingly.
Pickering's policy and
geomatics manager Jeff Brooks
told NRU, in Pickering there is
a need for rigid environmental
protections in the Altana
Forest, Rouge Park the Wildlife
Corridor in south Pickering and
in the Seaton lands, where there
is a defined natural heritage area.
"Wbere you may have
small remnants or small parts
of a natural feature, it really is
difficult to protect, whether that's
a result of infrastructure or other
dement that maybe required to
ensure that you have a complete
comrmmty{ he said.
Pickering mayor Dave Ryan
also identified a small site on
the Kingston Road corridor that
has a tributary running through
it that has been the subject of
a potential redevelopment for
years.
"That's an area that has long
been argued that it's going to
have to be piped as opposed
to being left an open, natural
space; he said, adding it runs
adjacent to Highway 2 and is
surrounded on all four sides
byresidential and commercial
development.
Although the official
plan contains policies on
compensation, Jacobs said
they only applyto a few
urban areas and certain
natural heritage features, as
well as major infrastructure
projects and do not adequately
address ecosystem loss and
compensation on a city-wide
basis.
"We realize there is a policy
void andwe need to broaden
our policies to address all of
Pickering," he said.
The city will be looking at
cresting a more complete policy
framework on ecosystem loss
and compensation to level
the playing field and create a
greater degree of consistency
for all development proposals
across the city. Staff will begin
crafting enabling policies for the
official plan. Brooks predicts that
exercise will be completed in the
fall. *
NCWWWnIL1E
f4NatTAfBR
NOVAE AES UABIS SREAIER TORONTO&HAMILTON AREA 41
Posted with permission of the publisher of NRU Publishing Inc. Original article first appeared in Novae
Res Urbis —GTHA Edition, Vol. 22 No. 18, Wednesday, May 1, 2019
RES.#699/19 - 2019 FIRST QUARTER FINANCIAL REPORT
Receipt of Toronto and Region Conservation Authority's (TRCA)
unaudited revenue and expenditures as of the end of the first quarter,
March 31, 2019 for informational purposes.
Moved by: Linda Jackson
Seconded by: Joanne Dies
IT IS RECOMMENDED THAT the 2019 First Quarter Financial Report ending March 31, be
received.
CARRIED
BACKGROUND
As part of TRCA's financial governance procedures, staff are presenting the 2019 First Quarter
Financial Report, which covers the period January 1, 2019 through to March 31, 2019. This
report provides information on both the spend rate of expenditures as well as the revenue
targets (excluding levy) for the first quarter of 2019.
RATIONALE
TRCA believes in transparency and accountability for its spending, revenue recognition and
performance of service delivery objectives in line with approved budgets, for both the
organization and for each project and program as an individual endeavour. This is further
supported by TRCA's core values which prioritize accountability of staff to be increasingly
responsible for their actions, behaviors and outcomes. TRCA recognizes that all projects and
programs offered have cost implications and that all costs incurred are in support of services
being practical and affordable. Transparency throughout the budget management process is
achieved in part through the analysis and reporting on year to date revenues and expenses as
compared to the current fiscal year budget. In order to improve the accuracy in reporting
anticipated issues in expenditures, TRCA established a seasonal forecasting baseline using
historical data from the past three years to estimate the quarterly seasonal variances within
each program area.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
FINANCIAL DETAILS
The operating and capital report by Service Area and underlying Program Areas are provided in
Attachments 1, 2 and 3 respectively. The attachments provide a summary analysis of
expenditures and revenues to date and the variance explanations by Program Area which have
a variance threshold of +/- 10% and $500,000 from anticipated quarterly spend rates. Variances
within these thresholds are deemed to be within the expected range. The operating report
contains no reportable variance for the first quarter, whereas the capital report contains four
Program Areas that have reportable variances. Attachment 3 provides more detail on these
variances.
Report prepared by: Jenifer Moravek, extension 5659
Emails: Jenifer.moravek@trca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: Michael.tolensky@trca.ca
Date: July 5, 2019
Attachments: 3
Attachment 1 — First Quarter Report — Operating Budget
Attachment 2 — First Quarter Report — Capital Budget
Attachment 3 — First Quarter Report — Reportable Variance Notes
ATTACHMENT 1- FIRST QUARTER REPORT -OPERATING BUDGET
Watershed Planning and Reporting
Watershed Plans and Strategies
Report Cards
Climate Science
Emerging and Integrative Climate Science
Water Resource Science
Groundwater Strategies
Source Water Protection Strategy
Regional Monitoring -Water
Hydrology
Stormwater Management Strategies
Flood Plain Mapping
Erosion Management
Capital Works
Hazard Monitoring
Flood Management
Flood Forecasting and Warning
Flood Risk Management
Flood Infrastructure and Operations
Biodiversity Monitoring
Regional Monitoring - Biodiversity
Activity Based Monitoring
Terrestrial Inventory and Assessment
Waterfront Monitoring
Ecosystem Management Research and Directions
Aquatic System Priority Planning
Terrestrial (and Integrated) Ecosystem Management
Natural Channel Design
Restoration Opportunities Bank
Forest Management
Managed Forest Tax Incentive Planning
Hazard Tree Management
Invasive Species Management
Forest Management Planning
Forest Management Operations
Restoration and Regeneration
Propagation and Sale of Plants
Inland and Lakefill Soil Management
Shoreline Restoration
2019 Budget:
201901 -201903
Anticipated Q1
Spend 1%)
Anticipated
01 Spend ($)
2019 Attua1:201901-2D3903
$DlHerenro
%DHferen[e
Reportable
Variance
Expenditures
1,581,000
Authority
Generated
24,000
Government
Funded
100,000
Levies Reserves
1,457,000 -
Net
-
25%
0%
22%
25%
0%
41%
395,250
395,250
181,485
78,512
259,997
-
5,450
1,875
7,325
10,350
22,356
32,706
1,790
51,391
Expenditures
390,783
Authority
Generated
-
Government
Funded Levies Reserves
20,000 - -
Net
(370,783)
(4,487)
(27,382)
15,253
(17,681)
166,951
7,089
-1.13%
.10.53%
208.23%
-54.06%
1,581,000 24,000 100,000 1,457,000 - -
390,783 20,000 - (370,783)
828,700 45,000 181,500 860,700 - (258,500)
358,500 100,000 (258,500)
144,146 1,481 - 18,890 (123,778)
88,469 - - (88,469)
1,187,200 45,000 281,500 R60,700 - (517,000)
- - - 26,900 - 26,900
21,800 - 21,800 - - -
7,500 - - - - (7,500)
29,300 - 21,800 26,900 - 19,400
232,615 1,481 - - 18,890 (212,245)
- - - - - -
22,433 - 35,778 - - 13,345
145 - - - - (145)
22,578 - 35,778 - - 13,200
12,235 - - - - (12,235)
2,790 (2,790)
25,000- - - - (25,000)
54,000 (54,000)
79,000 (79,000)
15,025 - (15,025)
10,000 10,000 - - - -
287,100 500,500 - - (100,000) 113,400
168,741 375 - - - (168,366)
58,480 183,280 - - - 124,800
ATTACHMENT 1- FIRST QUARTER REPORT -OPERATING BUDGET
Restoration and Regeneration (continued)
Wetlands
Riparian and Flood Plain Restoration
Natural Channel and Stream Restoration
Terrestrial Planting
Wildlife Habitat Management
Compensation Restoration
Watershed. Restoration
Greenspace Securement
Greenspace Land Acqusition
Greenspace Planning
Greenspace Management
Archaeology
Property Taxes and Insurance
Resource Management Planning
Inventory and Audit
Implementation
Hazard Management
Rental Properties
Rentals
Waterfront Parks
General Maintenance
Park Planning
Arsenal Lands
Park Development
Conservation Parks
Day Use
Picnics
Swimming
Fishing
Mountain Biking
Camping
Cross Country Skiing
Hitting
Park Development
Trails
Trail Development
Trail Management
Trail Planning
TRCA Trail Strategy
Bathurst Glen Golf Course
Golf Course
2019 Budget:
201901 -201903
Anticipated Q1
Anticipated
3019 Actual: 201901.2D3909
$DlHerenro
Is Difference
Reportable
Speed 1%)
01 Spend ($)
yarlanro
Authority
Government
Authority
Government
Expenditures
Generated
Funded
Levies
Reserves Net
Expenditures
Generated
Funded Levies Reserves
Net
24,000
-
24,000
-
- -
4,296
3,795
-
7,363 - -
3,568
(501)
80,000
-
80,000
-
- -.
14,320
60,710
-
- - -
(60,710)
46,390
26,400
-
26,400
-
- -
4,726
2,865
-
- - -
(2,865)
(1,860)
97,700
97,700
18%
0%
17,488
94,011
-
-
86,505
54,102
54,704
602
36,614
254,682
270.91%
525,200 510,500 228,100 (100,000) 113,400
348,693 183,655 62,068 - (102,970)
- - - 1,095,300 - 1,095,300
- - - - -
1,095,300 1,095,300
365,000 180,000 185,000 - - -
118,533 560 620 - - (117,353)
343,000
5,000
-
-
- (338,000)
81,291
164,854
28
- - -
(164,826)
21,400
-
-
-
- (21,400)
5,072
(25,519)
-
- - -
25,519
146,800
-
-
-
- (146,800)
34,792
81,124
-
- - -
(81,124)
50,000
-
-
-
- (50,000)
24%
11,850
219,509
459,150
1,572
-
- - -
(1,572)
121,056
55.15%
926,200 185,000 185,000 (556,200)
340,565 588 620 - (339,357)
1,970,600 3,483,600 138,500 - - 1,651,500
708,876 661,945 103,380 _ - 56,449
1,970,600
3,483,600
138,500
-
- 1,651,500
23%
0%
459,150
-
403,458
708,876
661,945
103,380 -
56,449
249,726
54.39%
_ -
2,216,800 514,800 - 1,506,500 - (195,500)
480,705 34,090 - - - (446,615)
1,315,650
2,069,700
-
-
- 754,050
239,448
77,159
171,000
- - -
93,841
477,500
518,500
-
-
- 41,000
86,905
11,285
711
- - -
(10,575)
15,000
89,000
-
-
- 74,000
2,730
6,210
9,014
- - -
2,804
1,453,000
2,331,400
-
-
- 878,400
264,446
157,902
227,729
- - -
69,828
42,000
117,000
-
-
- 75,000
18%
0%
7,644
1,004,631
-
24,486
97,657
- - -
73,170
(246,883)
-24.57%
5,519,950 5,640,400 - 1,506,500 - '1,626,950
757,748 540,201 - - - (217,548)
244 _ - - _ (244)
_ _ _ _ _ _
244 - - - - (244)
1,314,000
1,135,000
188,000
-
- 9,000
11%
140,598
140,598
147,212
97,602
- - -
(49,609)
6,614
4.70%
1,314,000 1,135,000 188,000 - - 9,000
147,212 97,602 - - - (49,609)
ATTACHMENT 1- FIRST QUARTER REPORT -OPERATING BUDGET
Black Creek Pioneer Village
Heritage Village
Events and Festivals
Kortright
Black Creek Pioneer Village
Other Facilities
Wedding and Corporate Events
Kortright
Black Creek Pioneer Village
Other Facilities
Development Planning and Regulation Permitting
Planning
Permitting
Enquiries
Technical Services
Development Enforcement and Compliance
Environmental Assessment Planning and Permitting
Planning (Basic, Servicing Agreements, Master Plans)
Permitting
Development Enforcement and Compliance
Technical Services
Policy Development and Review
Policy
School Programs
Early Learners
Post Secondary
Elementary
Secondary
Newcomer Services
Development of Internationally Trained Professionals
Multicultural Connections Program
Family and Community Programs
Kortright
Bolton Camp Development
Other Locations
Living City Transition Program
Sustainable Neighbourhood
Community Transformation
3039 Budget:
201901 -201903
Anticipated Q1
Anticipated
3019 Actual: 201901 - 201903
$ Difference
%DHferen[e
Reportable
Spend (%)
01 Spend ($)
Varlance
Authority
Government
Authority
Government
Expenditures
Generated
Funded
Levies
Reserves Net
Expenditures
Generated
Funded Levies Reserves
Net
4,235,450
1,952,000
230,000
(2,053,450)
16%
686,143
686,143
106,605
687,863
261,208
(426,655)
1,720
0.25%
4,235,450 1,952,000 230,000 (2,053,450)
687,863 261,208 (426,655)
207,000 396,400 - - - 189,400
122,126 215,180 - - - 93,054
246,900
321,000
-
-
- 74,100
127,154
55,671
23,619
- - -
(32,052)
193,000
347,000
-
- 154,000
52%
99,395
333,154
112,065
209,301
- - -
97,236
(43,291)
-12.99%
646,900 1,064,400 - - - 417,500
289,862 448,100 - - - 158,238
0 _ _ _ _ (0)
-
-
-
-
- -
-
(20)
2,908
- - -
2,928
-
-
-
-
0%
-
586,673
(20)
2,908
- -
2,928
(20)
2,454,700 4,595,000 50,000 - - 2,190,300
468,689 857,993 - - - 389,303
1,780,700
2,425,000
-
-
- 644,300
425,587
388,022
407,197
- - -
19,175
45,000
314,000
-
-
- 269,000
10,755
5,078
33,150
- - -
28,072
1,760,100
-
-
-
- (1,760,100)
420,664
468,843
-
- - -
(468,843)
502,800
-
-
-
- (502,800)
24%
120,169
1,563,849
109,490
- -
(109,490)
(123,727)
-7.91%
6,543,300 7,334,000 50,ODO - - 840,700
1,440,122 1,298,340 - - - (141,782)
1,216,650
980,000
587,900
196,000
- 547,250
294,429
219,716
201,663
- - -
(18,053)
1,104,650
1,126,000
329,900
196,000
- 547,250
267,325
222,432
201,663
- - -
(20,768)
335,200
-
-
-
- (335,200)
81,118
70,481
-
- - -
(70,481)
1,325,000
442,20D
- (882,800)
24%
24%
320,650
963,523
81,656
81,656
232,635
(232,635)
(218,259)
(20,589)
-22.65%
-25.21%
3,981,500 2,106,000 1,360,ODO 392,000 - (123,500)
745,264 403,326 - - - (341,938)
346,000 - - - - (346,000)
61,067 - - - (61,067)
346,000 - - - - (346,000)
61,067 - - - - (61,067)
720,790
180,400
-
-
- (540,390)
137,671
127,404
49,910
- - -
(77,494)
64,500
62,600
-
-
- (1,900)
12,320
41,952
2,157
- - -
(39,794)
4,570;840
3,415,400
7,000
2,231,030
- 1,082,590
873,030
839,070
492,339
- - -
(346,731)
103,200
- 103,200
19%
27%
-
1,023,021
194,937
199,937
6,290
6,290
(14,595)
(24,002)
-1.43%
-12.31%
5,356,130 3,761,600 7,000 2,231,030 - 643,500
1,008,425 550,695 - - - (457,730)
730,100 25,945 654,155 - - (50,000)
170,934 3,278 (41,707) - - (209,363)
730,100 25,945 R54,155 (50,000)
170,934 3,278 (41,707) (209,363)
899,500
284,100
-
-
- '5'4
47,052
153,656
66,752
- - -
(86,904)
111,300
111,500
1,703
20,000 21,900
50%
55,316
502,368
-
67,188
46,308
-
(20,880)
(281,523)
-56.04%
1,010,800 395,600 1,700 - 20,000 (593,500)
220,844 113,060 - - - (107,785)'
F- - - 127,700 - 127,700
- - - - -
ATTACHMENT 1- FIRST QUARTER REPORT -OPERATING BUDGET
Living City Transition Program (continued)
Partners in Project Green
Urban Agriculture
Sustainable Technology Evaluation Program
Climate Consortium
Green Infrastructure Ontario
Community Engagement
Citizen Based Regeneration
Stewardship
Watershed Engagement
Social Enterprise Development
Social Enterprise
Financial Management
Accounting and Reporting
Business Planning and Strategic Management
Corporate Management and Governance
Corporate Secretariat
Corporate Sustainability Management
Support Services
Risk Management
Office of the CEO
Human Resources
Volunteers
Employee Support
Health and Safety
Human Capital Planning and Strategies
Corporate Communications
Communications
Digital and Social Media
Information Infrastructure and Management
Information Technology
Knowledge and Data Management
Business Software
Project Recoveries
Project Recoveries
Vehicles and Equipment
Operations
Acquisitions
Grand Toni
2019 Budget:
201901 -201903
Anticipated Q1
Spend (%)
Anticipated
01 Spend ($)
3019 Actual: 201901 - 201903
$DlHerenro
%DHferen[e
Reportable
Variance
Autharity
Government
Authority
Government
Expenditures
Generated
Funded
Levies
Reserves Net
Expenditures
Generated
Funded Levies Reserves
Net
146,300
-
-
-
- (146,300)
25%
36,575
36,575
1,179
32,132
-
- - -
(32,132)
(4,443)
-12.15%
146,300 127,700 - (18,600)
32,132 - (32,132)
13,400 - - - - (13,400)
- - - - - -
279,200
311,200
-
_ 32,000
24,570
18,041
64,093
- - -
46,051
292,600
311,200
-
18,600
9%
0%
25,749
480,095
18,041
64,093
- - -
46,051
(7,708)
-29.93%
_ _ - _ _
2,233,000 711,000 80,000 7,523,050 - 6,081,050
576,952 (25,561) - - - (602,513)'
785,800
(785,800)
22%
168,947
649,042
237,923
- -
(237,923)
165,833
25.55%
3,018,800 711,000 80,000 7,523,050 - 5,295,250
814,875 (25,561) - - - (840,436)
1,371,000
-
-
-
- (1,371,000)
488,076
968,782
-
- - -
(968,782)
4,113,000
116,000
225,000
-
(3,772,000)
1,464,228
1,146,292
35,970
(232,858) - -
(1,343,180)
346,000
-
-
-
- (346,000)
36%
42%
123,176
2,075,480
549,519
549,519
648,980
92,277
- -
(92,277)
131,871
(264,829)
6.35%
-48.19%
5,830,000 116,000 225,000 (5,489,000)
2,207,351 35,970 (232,858) (2,404,239)
1,311,500 - - - - (1,311,500)
284,690 416,330 - - 131,640
1,311,500 - - - - (1,311,500)
284,690 416,330 - - 131,640
1,754,000 - - - - (1,754,000)
410,933 - - - - (410,933)
57,000
(57,000)
37%
21,090
670,070
359,600
27,647
(27,647)
(231,490)
-34.55%
1,811,000 (1,811,000)
438,580 (438,580)
1,450,000 - - - - (1,450,000)
315,168 - - - - (315,168)
1,157,600
-
-
-
- (1,157,600)
287,085
372,833
1,371
- - -
(371,462)
-
-
-
- -
25%
-
646,685
69,035
-
- - -
(69,035)
110,351
17.06%
2,607,600 - - - - (2,607,600)
757,035 1,371 - - - (755,665)
(5,498,000)
-
-
- 5,498,000
0%
-
-
(427,829)
- - -
427,829
(427,829)
(5,498;000) - - - - 5,498,000
(427,829) - - - - 427,829
(1,205,000)
-
-
-
- 1,205,000
-
(89,381)
-
- - -
89,381
1,105,000
- (1,105,000)
0%
18%
-
-
8,258,053
58,171
- - -
(58,171)
(31,210)
3,424,312
41.47%
(100,000) - 100,000
(31,210) - - - 31,210
45,402,430 28,801,245 3,750,755 15,220,180 (80,000) 1,772,750
11,682,366 5,058,590 (52,720) 18,890 (6,657,607)
ATTACHMENT 2 � FIRST QUARTER REPORT - CAPITAL BUDGET
Watershed Planning and Reporting
Watershed Plans and Strategies
Report Cards
Climate Science
Emerging and Integrative Climate Science
Water Resource Science
Groundwater Strategies
Source Water Protection Strategy
Regional Monitoring -Water
Hydrology
Stormwater Management Strategies
Flood Plain Mapping
Flood Management
Flood Risk Management
Flood Infrastructure and Operations
Erosion Management
Capital Works
Hazard Monitoring
Biodiversity Monitoring
Regional Monitoring - Biodiversity
Activity Based Monitoring
Terrestrial Inventory and Assessment
Waterfront Monitoring
Ecosystem Management Research and Directions
Aquatic System Priority Planning
Terrestrial (and Integrated) Ecosystem Management
Natural Channel Design
Restoration Opportunities Bank
Forest Management
Managed Forest Tax Incentive Planning
Hazard Tree Management
Invasive Species Management
Forest Management Planning
Forest Management Operations
Anticipated
Anticipated Ql
%
Reportable
2019 Budget: 201901 - 201903
Q1 Spend
Spend ($)
2019 Actual:
201901-201903
$Difference
Difference
Variance
I%1
Authority
Government
Authority
Government
Expenditures
Generated
Funded
Levies Reserves
Net
Expenditures
Generated
Funded
Levies Reserves
Net
1,024,000
7,000
414,000
653,000 -
50,000
136,192
185,889
-
75,476
305,784 -
195,371
243,000
243,000 -
13%
14%
32,319
168,511
136,036
136,036
245,672
40,399
72,366
31,967
$
$
57,777
(3,573)
34.3%
-2.6%
1,267,000 7,000 414,000 896,000 - 50,000
226,288 75,476 378,150 227,338
958,000 - - 958,000 -
132,463 - - 281,794 - 149,331
958,000 - - 958,000 - -
132,463 - - 281,794 - 149,331
749,000 7,000 - 742,000 -
- 1,730 - 42,389 - 44,119
506,750
5,000
501,750
- -
166,214
74,151
(1,036)
-
- -
(75,188)
486,900
26,900
59,700
593,400 -
193AW
159,703.20
105,486
31,789
12,187
44,945 -
(16,565)
130,000
-
80,000
- -
(60"-
42,640
43
-
-
- -
(43)
1,877,000
-
1,657,000
220,000 -
-
615,656
100,089
-
123,276
109,925 -
133,112
932,300
7,500
672,500
252,300
33%
305,794
1,535,680
77,349
3,410
11,591
(62,348)
$
(1,178,561)
-76.7%
A
4,681,950 46,400 2,970,950 3,807,700 - 143;299
357,119 35,893 135,463 208,850 - 23,087
3,053,300
-
2,030,400
970,000 -
(52900
839,658
501,160
-
(273,361)
245,451 -
(529,070)
1,222,000
21,000
437,000
814,000
50'
28%
336,050
1,175,708
15,444,436
290,804
68,623
89,088 -
(133,094)
$
(383,744)
-32.6%
4,275,300 21,000 2,467,400 1,784,000 (21900]
791,964 68,623 (273,361) 334,538 - (662,163)
81,716,593 1,332,100 63,134,593 17,252,800 - 2,900
4,785,771 378,955 638,922 5,089,790 - 1,321,897
1,748,920
228,920
3,520,000
19%
330,546
15,774,982
317,604.95
210,969
2,658
132,959 -
(75,353)
$ (10,778,242)
-68.3%
B
83,465,513 1,332,100 63,363,513 18,772,800 - 2,900
4,996,740 378,955 641,580 5,222,749 - 1,246,544
1,285,850 23,500 219,250 850,000 - (193,100)
184,047 40,274 53,645 133,146 - 43,018
558,550
224,700
66,650
267,200 -
-
137,961.85
112,863
162,567
42,385
25,079 -
117,168
425,000
-
-
425,000 -
-
104,975.00
84,526
-
16,500
15,026 -
(52,999)
371,000
-
371,000
- -
-
25%
91,637.00
652,178.80
93,960
475,396
-
202,841
_171,731
284,261
- -
173,252 -
77,771
184,958
$
(176,783)
-27.1%
2,640,400 248,200 656,900 1,542,200 - (153;290)
446,200
12,000
159,200
275,000 -
-
118,689.20
80,157
12,201
70,203
45,645 -
47,893
481,000
50,000
20,000
411,000 -
127,946
135,227
18,202
15,840
83,852 -
(17,334)
8,000
8,000
27%
2,128
248,763.20
2,621.60
11,580
22,768
11,189
$
(21,799)
-8.8%
935,200 62,000 187,200 686,000 '-
226,964 30,403 108,811 129,497 41,747
11,600 11,600 - - - _-.
549 - - - - (549)
904,200
-
509,200
395,000 -
-
204,349.20
135,425
4,278
-
26,435 -
(104,712)
227,000
9,000
88,000
130,000 -
51,302
56,009
-
6,760
98,613 -
49,364
330,400
3,400
327,000
23%
74,670.40
332,943.20
146,309
1,941
208,597
64,230
$
5,348
1.6%
1,473,200 24,000 597,200 852,000 - --
338,291 6,219 6,760 333,646 - 8,334
ATTACHMENT 2- FIRST QUARTER REPORT- CAPITAL BUDGET
Restoration and Regeneration
Propagation and Sale of Plants
Inland and Lakefill Soil Management
Shoreline Restoration
Wetlands
Riparian and Flood Plain Restoration
Natural Channel and Stream Restoration
Terrestrial Planting
Wildlife Habitat Management
Compensation Restoration
Watershed Restoration
Greenspace Securement
Greenspace Land Acqusition
Greenspace Planning
Greenspace Management
Archaeology
Resource Management Planning
Inventory and Audit
Implementation
Hazard Management
Waterfront Parks
General Maintenance
Park Planning
Arsenal Lands
Park Development
Conservation Parks
Day Use
Picnics
Fishing
Park Development
Trails
Trail Development
Trail Management
Trail Planning
TRCA Trail Strategy
Black Creek Pioneer Village
Heritage Village
Events and Festivals
Kortright
Black Creek Pioneer Village
Anticipated
Anticipated Q2
%
Reportable
2019 Budge: 201901
- 201903
Q1 Spend
Spend ($)
2019 Actual:
201901-201903
$Difference
Difference
Variance
(%)
Authority
Government
Authority
Government
Expenditures
Generated
Funded
Levies Reserves
Net
Expenditures
Generated
Funded
Levies Reserves
Net
95,000
-
-
95,000 -
-
18,145
3,307
-
-
- -
(3,307)
1,105,300
-
673,300
432,000 -
-
211,112.30
190,805
51,779
241,486
- -
102,460
1,111,100
355,400
81,700
674,000 -
-
212,220.10
227,509
183,075
(11,513)
6,381 -
(49,566)
530,500
1,500
-
529,000 -
-
132,625
51,608
36,316
-
12,629 -
(2,663)
1,418,400
265,000
330,000
823,400 -
-
270,914.40
166,437
194,768
135,333
426,360 -
590,024
3,429,700
31,200
39,500
3,359,000 -
-
655,072.70
359,521
8,942
6,435
1,222,048 -
877,904
195,625
-
60,625
135,000 -
37,364.38
94,306
125
15,625
9,572 -
(68,984)
2,128,550
2,023,550
105,000
- -
-
406,553.05
75,017
1,411,829
-
- -
1,336,812
6,552,500
4,604,550
1,672,000
275,950 -
-
1,251,528
98,569
46,022
166,776
15,843 -
130,072
_
16,566,675
7,281,200
2,962,125
6,323,350 -
19%
3,164,235
239,976
1,267,080
1,932,856
554,142
1,692,835 -
2,912,752
$
(1,897,155)
-60.0%
C
2,727,000 1,350,000 1,277,000 100,000 - -.
9,019 - 127,180 - - 118,162
-
-
-
- -
9%
-
239,976
79,819
1,230
103,540
20,236
- -
122,546
$
(229,727)
-95.7%
2,727,000 1,350,000 1,277,000 100,000 -
10,249 103,540 147,417 - - 240,707
417,900 99,000 - 423,200 - 104,300
110,998 - - 36,844 - (74,155)
131,300
-
-
- -
(131,300)
25,078
26,017
-
-
- -
(26,017)
4,370,550
-
3,600,600
769,950 -
-
834,775
69,885
-
-
331,596 -
261,711
33,000
-
-
33,000 -
19%
6,303
945,975
28,917.00
10,042
-
-
33,839 -
23,797
$
(729,033)
-77.1%
D
4,952,750 99,000 3,600,600 1,226,150 - (27,000)
216,942 - - 402,279 - 185,337
283,500 13,500 - 270,000 - -
396,964 - - - - (396,964)
1,287,600
21,600
227,000
1,039,000 -
-
131,335
11,577
940
54,113
- -
43,476
202,275
202,275
30%
20,632.05
180,884
172,487
9,270
(132,282)
- -
(141,551)
$
236,927
131.0%
1,773,375 35,100 429,275 1,309,000
417,811 940 (78,169) - - (495,040)
24,079 - 7,994 405,079 - 388,994
601,000 - - 601,000 - s.
-
-
-
- -
�.
-
-
-
3,675
- -
3,675
787,300
787,300
-
225,955.10
981
10,367
- -
9,396
1,388,300
787,300
501,000 -
29%
398,442
397,373.20
25,060
22,037
405,079 -
402,055
$
(373,382)
-93.7%
2,858,800 662,000 1,475,000 721,800 - -
432,502 92,378 507,013 49,326 43,476 259,691
196,100
28,000
48,500
- -
(119,600)
27,257.90
80,047
32,401
150,599
- -
102,954
295,800
-
65,100
377,300 -
146,600
41,116.20
47,953
-
-
- -
(47,953)
-
-
-
- -
14%
-
465,747
35,984
22,600
-
-
- -
(22,600)
$
117,355
25.2%
3,350,700 690,000 1,588,600 1,099,100 - 27,000
583,102 124,779 657,613 49,326 43,476 292,091
692,000 2,432,000 - 1,740,000
44,599 61,749 - 17,150
692,000
-
-
2,432,000 -
1,740,000
5%
35,984
44,599
-
-
61,749 -
17,150
$
8,615
23.9%
_
_
_
_ _
•_
0%
-
235
_
_
_
(235)
$
235
- - - - .-
235 - - - - (235)
ATTACHMENT 2 - FIRST QUARTER REPORT- CAPITAL BUDGET
Development Planning and Regulation Permitting
Planning
Technical Services
Environmental Assessment Planning and Permitting
Planning (Basic, Servicing Agreements, Master Plans)
Policy Development and Review
Policy
School Programs
Elementary
Secondary
Newcomer Services
Multicultural Connections Program
Family and Community Programs
Kortright
Bolton Camp Development
Other Locations
Living City Transition Program
Sustainable Neighbourhood
Community Transformation
Partners in Project Green
Urban Agriculture
Sustainable Technology Evaluation Program
Climate Consortium
Green Infrastructure Ontario
Community Engagement
Citizen Based Regeneration
Stewardship
Watershed Engagement
Financial Management
Accounting and Reporting
Corporate Management and Governance
Support Services
Risk Management
Anticipated
Anticipated Q1
%
Reportable
2019 Budge: 201901
- 201903
Q1 Spend
Spend ($)
2019 Actual:
201901-201903
$Difference
Difference
Variance
(%)
Authority
Government
Authority
Government
Expenditures
Generated
Funded
Levies Reserves
Net
Expenditures
Generated
Funded
Levies Reserves
Net
-
-
-
-
- -
-
19%
0%
19%
-
-
-
100,208
100,208
30,070
5,877-
-
-
-
- -
(5,877)
$
$
$
5,877
136,281
(4,566)
-4.6%
5,877 (5,877)
- - - - -
136,281 - - - - (136,281)
- - - - -
136,281 - - - - (136,281)
95,642 47,877 (47,764)
530,200 530,200
530,200 530,200
95,642 47,877 (47,764)
1,503,500 2,300 446,000 1,055,200 - -
258,934 258 152,025 65,978 - (40,673)
7,223,000
7,252,000
R9.QQ0
2%
26%
144,460
174,530
40,042
40,042
-
360,823
2,939
6,354,151
5,996,267
$
$
445,226
(13,530)
255.1%
-33.8%
8,726,500 2,300 446,000 8,307,200 20s04-0
619,756 3,196 152,025 6,420,129 - 5,955,594
155,200 5,200 '150,000
26,512 - - - - (26,512)
155,200 5,200 150,000
26,512 - - - - (26,512)
- - 20,000 - - 20,000
- - - - - -
250,000
250,000
-
- -
-
98,250
-
-
-
- -
-
38,100
9,100
-
(29,000)
39%
14,973
113,223
194,249
5,042
35,000
29,958
$
(108,182)
-95.5%
288,100 259,100 - (29,000)
5,042 35,000 20,000 49,958
1,055,700 99,500 278,200 678,000 - -
183,300 60,000 77,189 56,423 - 10,312
1,129,600
408,100
-
721,500 -
-
207,846
147,440
231,927
-
182,958 -
267,444
1,585,400
477,300
566,100
542,000 -
-
291,714
195,463
78,330
19,979
- -
(97,153)
325,000
-
-
325,000 -
-
59,800
53,854
-
-
172,481 -
118,627
2,068,000
1,002,000
253,000
813,000 -
-
380,512
563,727
398,351
141,129
- -
(24,248)
573,300
172,200
241,100
160,000 -
-
105,487.20
150,478
54,220
24,973
- -
(71,285)
358,000
38,000
93,000
227,000
-
18%
65,872
1,305,480
301,018
53,112
14,500
93,356
121,292
176,036
$
41,894
3.2%
7,095,000 2,197,100 1,431,400 3,466,500 -
1,347,374 837,327 356,626 533,155 379,734
1,824,350 108,150 246,000 1,470,200 - -.
203,217 15,141 76,229 132,185 - 20,337
683,500
39,500
22,000
622,000 -
_.
112,778
130,199
3,767
7,604
68,545 -
(50,284)
392,100
38,000
354,100
'-
17%
64,697
478,492
-
-
25,511
33,619
233,005
241,114
$
$
(119,564)
8,772
-25.0%
2,899,950 185,650 268,000 2,446,300
358,927 52,527 83,833 433,735 211,167
- - - - - -
8,772 - - - - _ (8,772)
8,772 - (8,772)
17,006,571
-
-
3,071,571 13,935,000
._
8%
1,360,526
1,360,526
1,094,968
-
-
55,587 -
(1,039,381)
$
(265,557)
-19.5%
17,006,571 3,071,571 13,935,000
1,094,968 55,587 (1,039,381)
ATTACHMENT 2- FIRST QUARTER REPORT- CAPITAL BUDGET
Human Resources
Volunteers
Health and Safety
Corporate Communications
Communications
Information Infrastructure and Management
Knowledge and Data Management
Business Software
Project Recoveries
Project Recoveries
Vehicles and Equipment
Operations
Grand Total
2019 Budge: 201901 - 201903
Anticipated
Q1 Spend
I%1
Anticipated Q2
Spend ($)
2019 Actual:
201901-201903
$Difference
%
Difference
Reportable
Variance
Expenditures
48,450
-
48,450
Authority
Generated
20,450
-
20,450
Government
Funded
28,000
-
28,000
Levies Reserves
- -
- -
- -
Net
-
-
0%
0%
25%
0%
0%
18%
-
-
-
166,656
164,655
-
-
-
-
30,882,543
Expenditures
2,676.
10,362
13,038
Authority
Generated
21,110
-
21,110
Government
Funded
6,500
-
6,500
Levies Reserves
- -
- -
- -
Net
24,935
(30,362)
14,572
$ 13,038
$ (59,495)
$ 48,730
$ (17,932)
$(16,922,092)
-35.7%
-54.8%
672,000 - - 672,000 - -
107,161 - - 266,707 - 159,545
107,161 266,707 - 159,545
672,000 672,000
3,500 3,500 - - -
48,730 - - - - (48,730)
3,500 3,500 - - - -
48,730 - - - - (48,730)
- -
(17,932) 17,932
- - - -
(17,932) 17,932
168,572,834 13,869,300 83,475,463 59,033,071 13,935,0007AUWI
13,960,451 3,834,209 2,901,013 17,430,933 43,476 10,249,180
ATTACHMENT 3 - FIRST QUARTER REPORT- REPORTABLE VARIANCE NOTES
OPERATING REPORTABLE VARIANCE NOTES
ONo variance to report in Q1.
CAPTIAL REPORTABLE VARIANCE NOTES
A
The lower than anticipated expenses are as a result of a delay in invoicing and additional unanticipated delays related to spring flooding on the Toronto
Islands. Once these are taken into account, the variance is ($423) which is within the acceptable threshold. The annual revenue targets are anticipated to
be on track.
B
The under expenditure is related to a number of major capital works projects being under spent in Q1 including: Gibraltar Point which was delayed due to
inclement spring weather; East Don Trail which is related to the timing of invoices; and Ashbridges Bay which is awaiting agreement execution prior to
mobilization; Upper trail at Ellesmere which is in the approvals phase; DMAF infrastructure projects which are in negotiations with private land owners and
anticipated to be spent in Q3 -Q4 of 2019; and a number of other major works which are temporarily delayed as a result of agreement execution and
negotiations. Once these are taken into account the variance is ($1,476) which is within the acceptable threshold. A combination of fee for service invoices
and grant revenues will be received throughout 2019, and the revenue targets are anticipated to be met.
C
The Meadoway revitalization project is underspent as a result of a shift in the timing of priority projects. Additionally, fee for service projects with our
municipal partners are anticipated to commence in Q2 -Q3. Once these are taken into account, the variance is ($460) which is within the acceptable range.
A number of projects within this Program Area are built under a fee for service model and will be reconciled once deliverables have been accomplished.
Annual revenue targets are currently on track and will be met by year end.
D
Projects under a cost recovery model with City of Toronto are anticipated to begin in Q2 -Q3. Once this is taken into account the variance is ($188) which is
within the acceptable threshold. As a result of this fee for service model, and 2019 funding which has been deferred into 2020 and will be reflected in Q4,
the annual revenue targets are anticipated to be met by year end.
RES.#6100119 - FUNDING AND GRANTS PROGRAM
To provide an in -year update to the Funding and Grants program and
to highlight the success rate as of August 2019. All financial information
is reported in '000's.
Moved by: Linda Jackson
Seconded by: Paula Fletcher
THAT the in -year Funding and Grants Program update for 2019, be received.
CARRIED
BACKGROUND
The Funding and Grants Program (the Program) within the Strategic Business Planning and
Performance business unit provides timely and strategic support for all Toronto and Region
Conservation Authority (TRCA) and Toronto and Region Conservation Foundation (TRCF)
funding and grant applications. The Program provides opportunities for TRCA programs and
services to diversify their revenue streams through additional support provided through the
centralized funding and grants team. The funding and grants team also assists in strengthening
the leadership and collaboration among all divisions to ensure consensus in the prioritization
and strategic positioning of all new funding opportunities.
RATIONALE
Attachment 1 provides a summary of the status of funding applications submitted in the current
or previous fiscal years where an approval or decline notice was received in 2019. The
attachment also highlights funding applications submitted in the current or previous fiscal years
that remain under review with the funder. The attachment is updated as of August 2019.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
Strategy 9 — Measure performance
FINANCIAL DETAILS
Between January 2019 and August 2019, the Program has facilitated a total of thirty-four
submissions to a variety of grant opportunities, with a total request value of $102,200. The
additional revenues and support generated through the Program helps to provide projects and
internal programs with increased support on developing sustainable business models and
reducing reliance on partner municipality funding where possible.
TRCA currently has $507 in grant applications that are currently under review with various
external funders following grant applications that were submitted in the current or previous fiscal
years. In 2019, TRCA has received notice that $65,012 has been awarded through the funding
and grants program and $36,690 has been declined. This provides TRCA with an in -year
success rate of 64% as of August 2019, as noted in the table below.
Table 1: In -Year Grant Program Update
Grant Status
# of Grants
Approved/Requested
Funding
$ 000's
Under Review
7
$507
Awarded
23
$65,012
Declined
14
$36,690
In addition to the funding applications submitted and/or awarded in the current fiscal year, TRCA
continues to manage grants and funding that have been successful in previous fiscal years and
are still active in 2019. TRCA has budgeted a total of $19,200 in revenues for 2019, which is
representative of all sources of grant funding. Table 2: Budgeted and Year to Date Actuals of
Grant Revenue provides a detailed breakdown of the different sources of grant funding currently
in the 2019 budget and the year to date actuals received.
As of August 2019, TRCA received 16% of the budgeted grant revenue for 2019. The percentage
of revenue received appears low at this point in 2019 as a result of the planned timing for when
revenues will be received from two major funding programs captured under the Federal and
Non -Government revenue sources in Table 2: Budgeted and Year to Date Actuals of Grant
Revenue. These projects include The Meadoway which will transfer the budgeted revenues from
the Toronto and Region Conservation Foundation at year end, and the Disaster Mitigation and
Adaptation Fund revenues that will be invoiced for following the execution of the agreement in
the fourth quarter.
Table 2: Budgeted and Year to Date Actuals of Grant Revenue
Revenue Source
2019 Grant Revenue
Received
2019 Grant
Revenue Budgeted
% of 2019
Budget
Received
Federal
464
7,492
6
Provincial
1,227
3,033
40
Municipal
900
3,412
26
Non -Government
529
5,246
10
TOTAL
3,120
19,183
16
The following section highlights some of the major projects and programs that make up the
budgeted total for each revenue category.
Federal
Toronto Region Ravine Erosion Management and Hazard Mitigation Project — with funding from
the Government of Canada's Disaster Mitigation and Adaptation Fund, the project will be
implemented to address erosion issues along ravine systems in the Region of Peel, York Region
and the City of Toronto over the next ten years.
Toronto Waterfront Erosion Hazard Mitigation Project — with funding from the Government of
Canada's Disaster Mitigation and Adaptation Fund, the project will repair 80 existing shoreline
erosion control structures along the Toronto waterfront across 13 different parks. The project will
protect over 10 kilometres of the Toronto waterfront over the next ten years.
Monarch Nation — TRCA was awarded a grant from Environment and Climate Change Canada
to engage children aged 6-12 in programming focused on species at risk. Over the next three
years, the program aims to engage 55,000 children through stewardship and environmental
action projects.
Provincial
Drinking Water Source Protection Program — with funding from the Ontario Ministry of the
Environment and Climate Change, the Drinking Water Source Protection Program supports
communities to continue to protect their drinking water sources under Ontario's framework
for source protection planning.
Professional Access Into Employment (PATE) Program — with funding from the Ontario Ministry
of Citizenship and Immigration, the PAIE Program continues to help internationally trained
environmental engineers, geoscientists, planners, ecologists and green building specialists to
obtain commensurate employed in Ontario.
Municipal
Scarborough Bluffers West Shoreline Access — The vision of the Scarborough Bluffers West
Project is to create a system of greenspaces along the Lake Ontario shoreline which respect
and protect the significant natural and cultural features of the Bluffs, enhance the terrestrial and
aquatic habitat, and provide a safe and enjoyable waterfront experience.
Non -Government
The Meadoway— with funding from The W. Garfield Weston Foundation, the Meadoway project
will transform 16 kilometres of hydro corridor into one of Canada's largest urban linear parks.
The Funding and Grants Program continues to support the establishment and success of
sustainable business models through collaboration with partners and the pursuit of diversified
revenue streams which directs additional resources towards key initiatives.
DETAILS OF WORK TO BE DONE
As the Program continues to evolve, staff will continue to develop a more comprehensive
methodology for tracking additional funding and collaboration opportunities that are available
following our partner municipalities successful funding applications to various grant programs.
TRCA will continue its efforts to grow the funding and grants program to support both core and
non-core activities as a means of reducing the financial impacts anticipated as a result of the
changes to the Conservation Authorities Act. TRCA staff will continue to update the Board of
Directors on a bi-annual basis as to the status and success of the Program inclusive of reporting
on the success rate and performance indicators for the program.
Report prepared by: Kimberly Krawczyk, extension 5862
Emails: Kim.krawczyk@trca.on.ca
For Information contact: Jenifer Moravek, extension 5659
Emails: Jenifer.moravek@trca.on.ca
Date: September 6, 2019
Attachments: 1
Attachment 1: In -Year Grant Program Update
Attachment 1: In -Year Grant Program Update
Total Grant Funding as of August 2019
Approved I
Funding Program
Project Title
Project Status
Requested Amount
($000's)
Under Review Grants
Community Museum Operating Grant (CMOG) - Ministry of Tourism,
Black Creek Pioneer Village
Under Review
Culture and Sport
221
Fisheries and Oceans Canada
Asian carp monitoring work
Under Review
75
Greening Action Partnership - York Region
William Foster Woods Planting
Under Review
4
Prosperous Greenbelt Fund - Friends of the Greenbelt Foundation
Greenbelt through the Seasons
Under Review
28
Remedial Action Plan (RAP) Governance Funding
Four Projects:
Under Review
1. Identifying High Impact Green Stormwater Infrastructure Retrofit and
Community Renewal Opportunities Throughout the Greater Toronto Area
2. Fish Consumption Survey
3. Green Boating Guide Update & Waterfront Interactive Map
4. Aquatic Habitat Toronto
71
Sustain Our Great Lakes - National Fish and Wildlife Fund
lCenterville Creek Barrier Removal and Valleyland Restoration
Under Review
89
The Pendle Fund - Community Foundation of Mississauga
Tower Revitalization: Intensive Community Engagement and Capacity
Under Review
19
Subtotal - Under Review Grants
$ 507
Awarded Grants
Barbie (Mattel Canada)
Girls Can Too, Bolton Camp
Active
12
Brampton and Caledon Community Foundation
Girls Can Too, Bolton Camp
Active
4
Canada Summer Jobs - Employment and Social Development
Multiple Locations:
Active
291
Canada
Conservation Areas: Heart Lake, Albion Hills, Bruce's Mill, Petticoat
Creek, and Boyd
- Campgrounds: Indian Line and Glen Rouge
- Bathurst Glen Golf Course
- Black Creek Pioneer Village
- Claremont Field Center
-The Meadoway
- Head Office: IT
- Tommy Thompson Park
- Kortright Center
Capital Improvement Plan - The Great Trail
Trans Canada Trail Connection - East Duffins Headwaters to Rouge
Active
16
National Urban Park
Capital Improvement Plan - The Great Trail
Claremont Greenway and Accessible Trail Loop Feasibility Study
Active
33
Disaster Mitigation and Adaptation Fund (DMAF) - Infrastructure
Toronto Ravine Erosion Risk Management and Hazard Mitigation Project
Active
22,312
Disaster Mitigation and Adaptation Fund (DMAF) - Infrastructure
Waterfront Erosion Hazard Mitigation Project
Active
33,795
Canada Intake 2
Drinking Water Source Protection - Ministry of the Environment,
Drinking Water Source Protection program
Active
522
Conservation and Parks
Every Tree Counts - Toronto Parks & Recreation
Greening TO Grounds
Active
70
Great Lakes Protection Initiative - Environment and Climate Canada
Two projects:
Active
187
1. Enhancing and Protecting Coastal Wetlands and Sheltered
Embayments at Tommy Thompson Park
2. Waterfront Rey ve Proiect
Green Corps (Student Subsidy) - United Nations Association in
Bolton Camp
Active
16
Green Corps (Student Subsidy) - United Nations Association in
Tommy Thompson Park
Active
5
Green Jobs Initiative (Student Subsidy) - Canadian Parks and
Sustainable Neighborhoods Action Plan
Active
5
Recreation Association
Green Jobs Initiative (Student Subsidy) - Canadian Parks and
Tommy Thompson Park
Active
6
Recreation Association
Health Canada -Cool Communities Initiative
Nikibii Dawadinna Giiwag (NDG) Cool Community Youth Training pilot -
Active
25
Indigenous youth program at Bolton Cam
Ministry of Nature Resources and Forestry - Section 39
Eligible projects: Flood Control Structures, Erosion Control Structures,
Active
400
Flood Forecasting and Warning System Operation, Natural Hazards Policy
Plan Inout. Administration
National Disaster Mitigation Program (NDMP) - Public Safety Canada
Six Projects:
Active
725
1. Black Creek at Rockcliffe
2. Duffins Creek Floodplain Mapping Update
3. Flood Emergency Management Plan
4. Flood Forecasting and Warning Systems
5. Petticoat Creek Hydrology Update
Natural Resources Canada - Colleges and Institutes Canada (CICan)
Sustainable Technologies Evaluation Program (STEP)/Technical Analyst
Active
15
Career-Launcher Natural Resources Internship program
Intern
Natural Resources Canada - GCWood
TRCXs New Administration Building
Active
2,000
Settlement and Resettlement Assistance Program CFP 2019 -
TRCA Newcomer Employment Programs
Active
4,375
Immigration, Refugees, and Citizenship Canada IRCC
TD Friends of the Environment Fund - TD Foundation
Two Projects:
Active
21
1. Girls can Too: Cultivating Connections at Bolton Camp
2. Wilderness Excursions: Torontonians Discover Tommy Thompson Park
Water and Erosion Control Infrastructure (WECI) - Ministry of Natural
Three Projects:
Active
170
Resources and Forestry
1. Scarlett Rd. Flood Channel Emergency Repair
2. Claireville Dam Security Gate Replacement
2ELMdls Flood Channel Repair
Young Canada Works - Heritage Canada
Young Canada Works in Heritage Organizations - search database
Active
7
Subtotal -Awarded Grants
$ 65,012
Declined Grants mill
AgriSpint Fund - Farm Credit Canada (FCC)
The Hub at Bolton Camp
Declined
25
Canada Nature Fund for Aquatic Species at Risk - Fisheries and
Redside Dace Habitat Management Strategy
Declined
Oceans Canada
400
Climate Action Fund - Environment and Climate Change Canada
Building Climate Resilience for Small-to-Medium Enterprises
Declined
228
Disaster Mitigation and Adaptation Fund (DMAF) - Infrastructure
Waterfront Erosion Hazard Mitigation Project
Declined
Canada
33795
Eco Action - Environment and Climate Change Canada
The Watershed Cleanup Project (People Power Challenge)
Declined
59
Enabling Accessibility - Economic and Social Development Canada
Two Projects:
Declined
• Building "The Hub": An Accessible and Inclusive Recreation Complex at
Bolton Camp
• A Hillp, Eield Center Accessibil tv Improvements
1356
Environmental Damages Fund - Environment and Climate Change
Two Projects:
Declined
Canada
1. 16720 Humber Station Online Pond Decommissioning
2. Watershed Strategies Private Sector LID Implementation for Onsite
Containment n rmw r Manauement
236
Future Launch - RBC
Youth Green Economy Program
Declined
50
Great Lakes Protection Initiative - Environment and Climate Canada
Two projects:
Declined
• Integrated Restoration Planning Phase 4 - Continued Restoration
Implementation
• Building Capacity for Widespread Implementation of Green Stormwater
Infrastructure in the City of Toronto
250
Green Economy Hubs - Green Economy Canada
PPG Green Economy Hub
Declined
59
Habitat Stewardship Program (Aquatic Projects)
Delineating Overwinter Habitat of the Endangered Redside Dace for
Declined
Improved Strategic Habitat Protection in Ontario
65
Habitat Stewardship Program (Terrestrial Projects)
Identifying the use of Anthropogenic Structure by Little Brown Myotis in the
Declined
TRCA Region
25
Habitat Stewardship Program (Terrestrial Projects)
JChorus Frog Wetland Restoration and Monitoring Project
Declined
90
Public Space Incubator Grant - Park People
Sap in the City
Declined
150
Subtotal Declined Grants
I $ 36,690
RES.#B101/19 - STANDARD DELEGATED PERMITS
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
THAT standard delegated permits, permission for routine infrastructure works, minor
works letters of approval, and permits after the fact / resolution of violations granted by
Toronto and Region Conservation Authority staff, in accordance with Ontario Regulation
166/06, as amended, which are listed below, be received.
CARRIED
Permits originally intended for August 9, 2019 Executive Committee
STANDARD DELEGATED PERMITS FOR RECEIPT— STAFF APPROVED AND ISSUED
Delegated Permits are processed by Planning and Development Division staff, authorized by
designated staff appointed as Enforcement Officers by the Board of Directors and received
monthly by the Executive Committee. Delegated permits are categorized as standard, routine
infrastructure works, emergency infrastructure works, minor works and permits after the
fact/resolution of violations. Standard permits are non-complex permissions consistent with
TRCA approved policies and procedures and issued for a time period of two years or less.
CITY OF BRAMPTON
1895377 ONTARIO INC. - Mimico Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 5,493.73 sq.m (59,134 sq.ft) addition to the
existing warehouse located at 25 Precidio Court in the City of Brampton. The works are
associated with a municipal Site Plan application (City File: SP 18-096) and building permit.
CFN: 61043 - Application #: 0276/191BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 3, 2019
2138436 ONTARIO INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate grading and servicing works associated with an approved
residential draft plan of subdivision and zoning by-law amendment application at Boyce
Crescent (south west Mayfield Road and McVean Drive), in the City of Brampton.
CFN: 61421 - Application #: 0390/19/13RAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 10, 2019
2366885 ONTARIO INC. (C/O VANDYK GROUP OF COMPANIES) - Etobicoke Creek
Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate grading and the construction of a berm in support of the
proposed interim risk management measure for a Provincially Significant Wetland (PSW)
at 10194 Heart Lake Road, in the City of Brampton.
CFN: 61619 - Application #: 0624/19/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: July 5, 2019
CLAIREVILLE HEIGHTS II LIMITED - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a high-rise apartment building with an
underground parking garage located at 65 Yorkland Boulevard in the City of Brampton. The
works are associated with a municipal official plan amendment application, zoning by-law
amendment application, site plan application and building permit application. The previously
approved TRCA permit for the works (Permit No. C-160921) expired on September 8, 2018. As
such, this permit will allow the applicant to complete the works.
CFN: 61491 - Application #: 0486/191BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone,
nicholas.cascone@trca.ca
Date: June 4, 2019
extension 5927, email
EMERY INVESTMENTS - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of the construction of a stormwater
management pond, and final grading and servicing associated with a draft plan of subdivision
application at (north east Countryside Drive and Heart Lake Road), in the City of Brampton.
CFN: 55833 - Application #: 0447/16/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: July 22, 2019
GIAMPAOLO INVESTMENTS LIMITED - Mimico Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek
Watershed in order to facilitate pre -grading and earthworks for a future warehouse building and
parking area associated with a municipal site plan application, minor variance application and
building permit application at 3 Kenview Boulevard, in the City of Brampton.
CFN: 61494 - Application #: 0485/19/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: May 23, 2019
LAKE PATH HOLDINGS INC. - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate grading and servicing works associated with an approved
residential draft plan of subdivision at 100 Conestoga Drive, in the City of Brampton.
CFN: 60522 - Application #: 1177/18/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 6, 2019
NEAMSBY INVESTMENTS INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate final grading and servicing associated with an approved
residential subdivision located at Mayfield Road and Bramalea Road, in the City of Brampton.
CFN: 59711 - Application #: 0446/18/13RAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 25, 2019
KETTLE POINT INVESTORS INC. PATILDA CONSTRUCTION INC. - Humber River
Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate final grading and servicing associated with an approved
residential subdivision located at Mayfield Road and Bramalea Road, in the City of Brampton.
CFN: 59718 - Application #: 0443/18/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 26, 2019
WALLSEND DEVELOPMENT INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate final grading and servicing associated with an approved
residential subdivision located at Mayfield Road and Bramalea Road, in the City of Brampton.
CFN: 59715 - Application #: 0449/18/13RAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 19, 2019
ZAG PROPERTIES (BRAMPTON) INC. - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 3,959 sq.m (42,603 sq.ft) car dealership
and associated parking area located at 50 Coachworks Crescent in the City of Brampton. The
works are associated with a municipal Site Plan application (City File: SP18-104) and building
permit.
CFN: 61618 - Application #: 0621/191BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 26, 2019
CITY OF MARKHAM
CITY OF MARKHAM - Don River Watershed
The purpose is to undertake stabilization works on an eroding stream bank to protect adjacent
residential dwellings. The works will include repair of a naturally eroding stream bank which
coincides with the toe of slope in the valley lands of the East Don Tributary adjacent to 32-34
Dalmeny Road. The warm water construction timing window will apply to this project.
CFN: 60220 - Application #: 0803/18/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gamma npila@trca.ca
Date: June 26, 2019
CITY OF MARKHAM - Don River Watershed
The purpose is to undertake expansion of a multi -use pathway on John Street and Esna Park
Drive from Bayview Avenue to Rodick Road. The existing pathway is approximately 5 km long
and it is currently used as a public pedestrian sidewalk. The proposed works intend to convert
the existing sidewalk into a multi -use pathway accessible for pedestrians and cyclists. No in -
water works are associated with this project.
CFN: 61254 - Application #: 0337/19/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
Date: July 19, 2019
CITY OF MARKHAM - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
watershed to facilitate the construction of a one -storey addition to an existing building at 8100
Warden Avenue, Markham. The proposed addition is approximately 712.69 square metres in
size.
CFN: 61594 - Application #: 0550/19/MARK
Report Prepared by: Aidan Pereira, extension 5723, email aidan.pereira@trca.ca
For information contact: Aidan Pereira, extension 5723, email aidan.pereira@trca.ca
Date: June 6, 2019
NEAMSBY INVESTMENTS INC. - Rouge River Watershed
The purpose is to facilitate site preparation, grading, servicing and construction on a new
residential subdivision located at 5659-5865 14th Avenue, Markham.
CFN: 60527 - Application #: 1194/18/MARK
Report Prepared by: Quentin Hanchard, extension 5324, email quentin.hanchard@trca.ca
For information contact: Quentin Hanchard, extension 5324, email
quentin.hanchard@trca.ca
Date: June 19, 2019
6 TOLLESBURY PLACE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
watershed to facilitate minor landscaping alterations at the rear of the existing dwelling at 6
Tollesbury Place, Markham.
CFN: 61577 - Application #: 0521/191MARK
Report Prepared by: Aidan Pereira, extension 5723, email aidan.pereira@trca.ca
For information contact: Aidan Pereira, extension 5723, email aidan.pereira@trca.ca
Date: May 28, 2019
CITY OF MISSISSAUGA
MATRIX CIRCUIT BOARD MATERIALS - Etobicoke Creek Watershed
The purpose is to undertake work within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 18.35 m by 12.22 m (60.2 ft by 40.1 ft) pre-
engineered steel storage shed at the rear of the existing building associated with a municipal
building permit. The subject property is located at 1116 Mid -Way Boulevard, in the City of
Mississauga.
CFN: 61500 - Application #: 0508/19/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 13, 2019
7153 LANCASTER AVENUE - Mimico Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek
Watershed in order to facilitate the construction of a 139.54 sq. m (1,502 sq. ft.) two storey
single family dwelling associated with a Municipal Minor Variance application (Town File: A
282/18) and a municipal building permit. The property is located at 7153 Lancaster Avenue, in
the City of Mississauga.
CFN: 60911 - Application #: 0008/19/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 11, 2019
CITY OF PICKERING
1864 FALCONWOOD WAY - Frenchman's Bay Watershed
The purpose is to construct a raised deck at the rear of an existing two storey single family
detached dwelling located at 1864 Falconwood Way in the City of Pickering.
CFN: 61600 - Application #: 0548/191PICK
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 26, 2019
MATTAMY (SEATON) LIMITED - Duff ins Creek Watershed
The purpose is to site grade and install temporary sediment and erosion control outfalls at
Mulberry Lane in the City of Pickering.
CFN: 61282 - Application #: 0259/19/PICK
Report Prepared by: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: March 18, 2019
117 SANDCHERRY COURT - Rouge River Watershed
The purpose is to construct a stone patio, wooden deck, hot tub, and pergola in the rear yard of
the existing single detached dwelling at 117 Sandcherry Court in the City of Pickering.
CFN: 61495 - Application #: 0498/191PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 16, 2019
PICKERING DEVELOPMENTS (401) INC. - Duff ins Creek Watershed
The purpose is to construct a stormwater outfall to Duff ins Creek south of Highway 407, west of
Church Street at 2028 Kellino Street.
CFN: 61501 - Application #: 0520/19/PICK
Report Prepared by: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: May 28, 2019
1540 MARSHCOURT DRIVE - Duffins Creek Watershed
The purpose is to construct a new entrance and carry out interior alterations to create a new
secondary suite in the basement of the existing single detached dwelling at 1540 Marshcourt
Drive in the City of Pickering.
CFN: 61610 - Application #: 0579/19/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 16, 2019
CITY OF RICHMOND HILL
1700 STOUFFVILLE ROAD - Rouge River Watershed
The purpose is to remove a culvert and crossing historically constructed across a tributary of the
Rouge River at 1700 Stouffville Road in the City of Richmond Hill..
CFN: 61006 - Application #: 0090/19/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: May 13, 2019
COUNTRYWIDE HOMES (JEFFERSON) INC. - Rouge River Watershed
The purpose is to conduct site stripping and earthworks in preparation for the construction of an
approved residential subdivision within a Regulated Area of the Rouge River watershed on the
south side of Jefferson Sideroad, east Beech Avenue, north of Harris Avenue in the City of
Richmond Hill.
CFN: 61472 - Application #: 0467/191RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 26, 2019
HOLY TRINITY SCHOOL - Rouge River Watershed
The purpose is to construct an addition to an existing institutional building within a Regulated
Area of the Rouge River watershed at 11300 Bayview Avenue in the City of Richmond Hill.
CFN: 61590 - Application #: 0534/19/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 6, 2019
19 RAINTREE CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed to construct a 32.99 square metre, non -habitable cabana on an existing residential
lot located at 19 Raintree Crescent, Richmond Hill.
CFN: 61639 - Application #: 0565/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 2, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
7 RIVERSIDE CRESCENT - Humber River Watershed
The purpose is to construct a two-storey addition, third storey balcony, and a small second
storey addition to the existing single family detached dwelling at 7 Riverside Crescent in the City
of Toronto (Toronto and East York Community Council Area).
CFN: 58351 - Application #: 0944/17/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 21, 2019
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing culvert (Culvert 274) over Berry Creek, on Islington
Avenue, between Golfdown Drive and Leduc Drive, in the City of Toronto. The warm water
construction timing window applies to this project.
CFN: 60618 - Application M 1151/18/TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 17, 2019
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing culvert (Culvert No. 267), located on Albion Road over
Albion Creek, between Islington Avenue and Kipling Avenue, in the City of Toronto. The warm
water construction timing window applies to this project.
CFN: 60619 - Application M 1150/181TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 17, 2019
CITY OF TORONTO - Humber River Watershed
The purpose is to upgrade the secondary treatment process at the South Plant of the Humber
Treatment Plant, located at 130 The Queensway, near South Kingsway, in the City of Toronto.
There are no in -water works associated with this project.
CFN: 61260 - Application M 0385/191TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 18, 2019
2581 ISLINGTON AVENUE - Humber River Watershed
The purpose is to construct a new single family detached residential dwelling on the existing
vacant lot of record municipally described as 2581 Islington Avenue in the City of Toronto
(Etobicoke York).
CFN: 61177 - Application M 0218/19/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 18, 2019
2575 ISLINGTON AVENUE - Humber River Watershed
The purpose is to construct a new single family detached residential dwelling on the existing
vacant lot of record municipally described as 2575 Islington Avenue in the City of Toronto
(Etobicoke York).
CFN: 61178 - Application #: 0213/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 18, 2019
2577 ISLINGTON AVENUE - Humber River Watershed
The purpose is to construct a new single family detached residential dwelling on the existing
vacant lot of record municipally described as 2577 Islington Avenue in the City of Toronto
(Etobicoke York).
CFN: 61179 - Application #: 0216/19/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 11, 2019
2579 ISLINGTON AVENUE - Humber River Watershed
The purpose is to construct a new single family detached residential dwelling on the existing
vacant lot of record municipally described as 2579 Islington Avenue in the City of Toronto
(Etobicoke York).
CFN: 61180 - Application #: 0217/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 18, 2019
FIRST CAPITAL (NORTH YORK) CORPORATION - Humber River Watershed
The purpose is to reconfigure the existing Tim Horton's double drive-thru (with two order
stations and two drive thru windows) to a double order station model (with two order stations
and one drive-thru window) at 2208 Jane Street in the City of Toronto (Etobicoke York).
CFN: 58001 - Application #: 0648/171TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 25, 2019
HUMBER CO-OPERATIVE DEVELOPMENT CORPORATION - Humber River Watershed
The purpose is to permit the development of a new 22 -storey multi -unit residential building
including 4 levels of below grade parking at 10 Wilby Crescent in the City of Toronto (Etobicoke
York).
CFN: 60307 - Application #: 0859/18/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 19, 2019
HYDRO ONE NETWORKS INC. - Mimico Creek Watershed
The purpose is to undertake construction of a medium voltage gas -insulated switchgear building
on 99 Woolner Avenue, near Jane Street and St. Clair Avenue West, in the City of Toronto. No
in -water work is within the scope of this project.
CFN: 61349 - Application #: 0354/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Renee Afoom-Boateng, extension 5714, email renee.afoom-
boateng@trca.ca
Date: June 10, 2019
72 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a two-storey side addition and a second storey addition over the
existing one -storey single family dwelling at 72 Cynthia Road in the City of Toronto (Etobicoke
York Community Council Area). The proposal also involves the construction of a rear wood
deck.
CFN: 61171 -Application #: 0191/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 11, 2019
369 LAKE PROMENADE -Waterfront Watershed
The purpose is to construct a partial second storey addition towards the front of the existing
dwelling and above the existing integral garage and a small side (west) addition to the existing
1.5 storey dwelling at 369 Lake Promenade in the City of Toronto (Etobicoke York). The existing
rear deck and patio are to be maintained.
CFN: 61860 - Application #: 0715/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: July 12, 2019
31 MARLEBON ROAD - Humber River Watershed
The purpose is to facilitate construction of a detached garage to the side of the existing single
family dwelling at 31 Marlebon Road in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 61655 - Application #: 0588/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 17, 2019
50 CYNTHIA ROAD - Humber River Watershed
The purpose is to construct a new two storey single family detached dwelling at 50 Cynthia
Road in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling
and detached garage are to be demolished.
CFN: 61325 - Application #: 0345/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 8, 2019
RESIDENCES OF ISLINGTON TERRACE INC. AND CITY OF TORONTO - Humber River
Watershed
The purpose is to construct a pedestrian staircase and switchback ramp within the City's road
right of way (RoW) for the purpose of connecting the residential development located at 64-70
Cordova Avenue to Islington Avenue in the City of Toronto (Etobicoke York).
CFN: 61791 - Application #: 0748/191TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 23, 2019
WILLIAM OSLER HEALTH SYSTEM - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to permit the installation of three signs located at 101 Humber College
Boulevard in the City of Toronto (Etobicoke York Community Council Area).
CFN: 61650 - Application #: 0586/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 17, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Don River Watershed
The purpose is to rehabilitate Donino Avenue Bridge over the West Don River and replace an
existing 250 mm diameter watermain, located on Donino Avenue, south of Mill Street, in the City
of Toronto. The cold water construction timing window applies to this project.
CFN: 61366 - Application #: 0426/19/TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: July 17, 2019
CITY OF TORONTO - Don River Watershed
The purpose is to upgrade a portion of the Leslie Street storm sewer along the Leslie Street
Right of Way in the City of Toronto (North York Community Council Area).
CFN: 61657 - Application #: 0606/19/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 23, 2019
92 GLENVIEW AVENUE - Don River Watershed
The purpose is to construct a three storey replacement dwelling and minor grading in the rear
yard, where an existing two storey single family detached dwelling is currently located at 92
Glenview Avenue in the City of Toronto (North York Community Council Area).
CFN: 56798 - Application #: 1135/16/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 9, 2019
9 YORK DOWNS DRIVE - Don River Watershed
The purpose is to construct a sports court, landscaping and minor grading to the rear of the
existing dwelling at 9 York Downs Drive in the City of Toronto (North York Community Council
Area).
CFN: 61591 - Application #: 0546/19/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 18, 2019
34 GLENORCHY ROAD - Don River Watershed
The purpose is to construct a two storey replacement dwelling with rear attached patio where an
existing one storey single family detached dwelling is currently located at 34 Glenorchy Road in
the City of Toronto (North York Community Council Area).
CFN: 59683 - Application #: 0382/18/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 11, 2019
333 SHELDRAKE BOULEVARD - Don River Watershed
The purpose is to extend an existing concrete patio and replace an existing shed where a two
storey single family detached dwelling is currently located at 333 Sheldrake Boulevard in the
City of Toronto (North York Community Council Area).
CFN: 61476 - Application #: 0461/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 18, 2019
1 DENVER CRESCENT - Don River Watershed
The purpose is to construct a two storey replacement dwelling with rear attached basement
walkout, deck, and patio where an existing one storey single family detached dwelling is
currently located at 1 Denver Crescent in the City of Toronto (North York Community Council
Area).
CFN: 61578 - Application #: 0516/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 11, 2019
17 GREEN VALLEY ROAD - Don River Watershed
The purpose is to construct a two storey replacement dwelling with attached rear deck,
basement walkout, and landscaping where an existing two storey single family detached
dwelling is currently located at 17 Green Valley Road in the City of Toronto (North York
Community Council Area).
CFN: 60901 -Application #: 1191/181TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 4, 2019
121 CITATION DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling with basement walkout and new
rear attached deck where an existing one storey single family detached dwelling is currently
located at 121 Citation Drive in the City of Toronto (North York Community Council Area).
CFN: 61588 - Application #: 0544/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 10, 2019
RENECAP HOLDING LTD. - Don River Watershed
The purpose is to construct a two storey replacement dwelling, rear patio, inground pool with
associated hardscaping, and realign an existing drainage swale including the construction of a
short retaining wall on the east portion of the lot, where an existing one storey single family
detached dwelling is currently located at 83 Forest Heights Boulevard in the City of Toronto
(North York Community Council Area).
CFN: 58117 - Application #: 0776/17/TOR
Report Prepared by: Stephanie Worron, extension 5907, email step hanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 23, 2019
40 SENLAC ROAD - Don River Watershed
The purpose is to construct a two storey replacement dwelling with rear basement walkout and
attached deck where an existing two storey single family detached dwelling is currently located
at 40 Senlac Road in the City of Toronto (North York Community Council Area).
CFN: 59269 - Application #: 0083/18/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 4, 2019
TFS CANADA'S INTERNATIONAL SCHOOL - Don River Watershed
The purpose is to expand an existing playground area to the northwest and construct a new
scoreboard to the northeast of an existing institutional building located at 296 Lawrence Avenue
East in the City of Toronto (North York Community Council Area).
CFN: 61387 - Application #: 0363119/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 27, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
5 BELLEHAVEN CRESCENT - Waterfront Watershed
The purpose is to construct a two storey replacement dwelling with rear attached deck and patio
where an existing one storey single family detached dwelling and rear inground pool are
currently located at 5 Bellehaven Crescent in the City of Toronto (Scarborough Community
Council Area).
CFN: 60267 - Application #: 0843/18/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 20, 2019
CITY OF TORONTO - Highland Creek Watershed
The purpose is to undertake pond and stream restoration in Milliken Park, near Steeles Avenue
East and McCowan Road, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 58633 - Application #: 0107/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: May 10, 2019
INFRASTRUCTURE ONTARIO DEVELOPMENT PLANNING - Highland Creek Watershed
The purpose is to expand an existing parking lot where an existing banquet hall is currently
located 1199 Kennedy Road in the City of Toronto (Scarborough Community Council Area).
CFN: 60257 - Application #: 0829/181TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 14, 2019
112 TORRANCE ROAD - Highland Creek Watershed
The purpose is to construct a second storey addition over the existing dwelling footprint where a
one storey single family detached dwelling is currently located at 112 Torrence Road, in the City
of Toronto (Scarborough Community Council Area).
CFN: 61584 - Application #: 0533/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 27, 2019
1 KINGSBURY CRESCENT - Waterfront Watershed
The purpose is to construct a two storey replacement dwelling with attached rear deck where an
existing one storey single family detached dwelling is currently located at 1 Kingsbury Crescent
in the City of Toronto (Scarborough Community Council Area).
CFN: 61566 - Application #: 0517/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 9, 2019
MOUNT PLEASANT GROUP OF CEMETERIES - Don River Watershed
The purpose is to facilitate the formalization of the outdoor storage yard at Pine Hill Cemetery
(625 Birchmount Road) in the City of Toronto (Scarborough Community Council Area).
CFN: 58527 - Application #: 1063/17/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 8, 2019
THE MANUFACTURERS LIFE INSURANCE COMPANY - Rouge River Watershed
The purpose is to construct a new distribution facility, stormwater management facility and
associated parking and infrastructure at 6351 Steeles Avenue East in the City of Toronto
(Scarborough Community Council).
CFN: 61656 - Application #: 0607/19/TOR
Report Prepared by: Mark Rapus, extension 5259, email mark.rapus@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 2, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
140 HUMBERCREST BOULEVARD - Humber River Watershed
The purpose is to construct a two storey dwelling at 140 Humbercrest Boulevard in the City of
Toronto (Toronto and East York Community Council Area).
CFN: 61475 - Application #: 0469/19/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 19, 2019
CANADIAN TIRE PROPERTIES INC. - Waterfront Watershed
The purpose is to develop within a TRCA Regulated Area of the Don River watershed in order
to facilitate alterations to the existing building at 16A Leslie Street in the City of Toronto (Toronto
and East York Community Council Area).
CFN: 61608 - Application #: 0560/191TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 24, 2019
CITY OF TORONTO - Don River Watershed
The purpose is to reconstruct an existing parking lot located at 260 Dawes Road, near Danforth
Avenue and Victoria Park Avenue, in the City of Toronto. No in -water work is within the scope of
this project.
CFN: 59628 - Application #: 0362/181TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 20, 2019
7 GLEN EDEN CRESCENT - Don River Watershed
The purpose is to facilitate the construction of a replacement dwelling with a rear deck and
basement walkout at 7 Glen Eden Crescent in the City of Toronto (Toronto & East York
Community Council Area). The proposal also involves replacement of an existing pool and
landscaping works, including minor grading at the rear.
CFN: 59661 - Application #: 0364/181TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Daniel Pina, extension 5250, email daniel.pina@trca.ca
Date: June 13, 2019
14 WOODFIELD ROAD - Don River Watershed
The purpose is to construct a third -storey addition (dormers) to the existing three storey single
family dwelling at 14 Woodfield in the City of Toronto (Toronto & East York Community Council
Area).
CFN: 61764 - Application #: 0625/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: July 4, 2019
120 HUMBERCREST BOULEVARD - Humber River Watershed
The purpose is to construct a second storey addition and deck to the rear at 120 Humbercrest
Boulevard in the City of Toronto (Toronto and East York Community Council Area).
CFN: 60707 - Application #: 1156/18/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 15, 2019
134 ELLIS PARK ROAD - Humber River Watershed
The purpose is to construct a two-storey single family detached dwelling with an integral garage
at 134 Ellis Park Road in the City of Toronto (Toronto and East York Community Council area).
CFN: 60957 - Application #: 0040/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 22, 2019
16 MINTO STREET - Don River Watershed
The purpose is to construct a three-storey rear addition, and second and third storey addition
over the existing one -storey single family dwelling at 16 Minto Street in the City of Toronto
(Toronto & East York Community Council Area). The proposal also involves the construction of
a front porch and rear deck as well as the creation of two new dwelling units.
CFN: 61587 - Application #: 0541/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: July 12, 2019
50 GLENWOOD CRESCENT - Don River Watershed
The purpose is to replace an existing landscape wall located on the rear yard at 50 Glenwood
Crescent in the City of Toronto (Toronto and East York Community Council Area).
CFN: 61556 - Application #: 0491/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 26, 2019
1 MARIGOLD AVENUE - Don River Watershed
The purpose is to replace an existing carport to the side of the two-storey semi-detached
dwelling at 1 Marigold Avenue in the City of Toronto (Toronto & East York Community Council
Area).
CFN: 61738 - Application #: 0605/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 21, 2019
79 MATHERSFIELD DRIVE - Don River Watershed
The purpose is to construct a two storey side addition to the existing two storey single family
dwelling at 79 Mathersfield Drive in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 61322 - Application #: 0350/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 7, 2019
42 DAVIS CRESCENT - Don River Watershed
The purpose is to construct a second storey addition over the existing single family detached
dwelling and rear deck at 42 Davies Crescent in the City of Toronto (Toronto & East York
Community Council Area).
CFN: 58728 - Application #: 1217/17/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 27, 2019
WATERFRONT TORONTO - Don River Watershed
The purpose is to undertake site preparation, demolition and shallow excavation for the new
Don River channel and mouth as part of the Port Lands Flood Protection and Don Mouth
Naturalization project on 480 Lakeshore Boulevard, 242 Cherry Street, 75, 85, 95, 97, and 99
Commissioners Street; 150 Commissioners Street, 155 and 165 Villiers Street; and 170 Villiers
Street. There are no in -water works associated with the project.
CFN: 61075 - Application #: 0136/191TOR
Report Prepared by: Renee Afoom-Boateng, extension 5714, email renee.afoom-
boateng@trca.ca
For information contact: Renee Afoom-Boateng, extension 5714, email renee.afoom-
boateng@trca.ca
Date: June 17, 2019
YORK CONDOMINIUM CORPORATION NO. 66 - Don River Watershed
The purpose is to facilitate the waterproofing of the existing underground parking garage at 1A
Dale Avenue in the City of Toronto (Toronto and East York Community Council Area).
CFN: 61580 - Application #: 0525/19/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 2, 2019
CITY OF VAUGHAN
2748355 CANADA INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area (Exchange Avenue and
Peelar Road) of the Humber River Watershed in order to permit the installation of sanitary
sewer connecting Highway 7 along Interchange Way, Exchange Avenue to Peelar Road.
CFN: 61124 - Application #: 0194/191VAUG
Report Prepared by: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 10, 2019
2748355 CANADA INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate topsoil stripping and preliminary grading works on lands known
municipally as 2 Commerce Street, in the City of Vaughan.
CFN: 61740 - Application #: 0603/19/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 26, 2019
21 CROMDALE RIDGE -Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 19 sq. m. (204 sq. ft) in ground pool on
lands known municipally as 21 Cromdale Ridge, in the City of Vaughan.
CFN: 61206 - Application #: 0274/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: March 20, 2019
CAMELOT ON 7 INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate site alteration works including topsoil stripping, placement of fill
materials and grading and the construction of a seven (7) storey residential building and
associated servicing infrastructure. The subject properties are located in Part of Lot 6,
Concession 7, on lands known municipally as 4902 & 4908 Highway 7, in the City of Vaughan.
Landowner authorization has also been provided to conduct site alteration and restoration
activities on the neighbouring land to the west owned by Park Lawn Limited Partnership..
CFN: 61638 - Application #: 0557/191VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: June 10, 2019
CITY OF VAUGHAN - Humber River Watershed
The purpose is to install a 21.5 m long Maccaferri Terramesh retaining wall and reinforced
concrete caisson piles to protect City of Vaughan's sanitary sewer and watermain infrastructure
located within a sloped easement on 7409 Islington Avenue.
CFN: 61506 - Application #: 0457/191VAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: June 17, 2019
71 SYLVAN BROOK AVENUE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 357.75 sq. m. (3850.59 sq. ft.) 2 storey
single family dwelling associated with a municipal building permit. The subject property is
located on lands known municipally as 71 Sylvan Brook Avenue, in the City of Vaughan.
CFN: 61480 - Application #: 0514/191VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 21, 2019
MOLISE KLEINBURG ESTATES SOUTH INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to maintain a Stormwater Management Pond in Block 61.
CFN: 61299 - Application #: 0319/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: April 2, 2019
1 RAYMOND DRIVE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the development of a replacement residential dwelling with a footprint of
356.21 sq. m. (3834 sq. ft.), a 241 sq. m. (2594 sq. m.) patio, and a 53 sq. m. (580 sq. ft.)
swimming pool on lands known municipally as 1 Raymond Drive, in the City of Vaughan.
CFN: 61564 - Application #: 0511/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: May 24, 2019
NIPOTI BLOCK 12 WEST INC. AND CASTLEPOINT INVESTMENTS INC. - Don River
Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Don River Watershed, the
cleaning out of accumulated sediment from an existing Stormwater Management Pond in Block
12 at the Southeast of Teston Road and Dufferin Street, in the City of Vaughan.
CFN: 61205 - Application #: 0255/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: June 14, 2019
PENGUIN - CALLOWAY (VAUGHAN) INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 1.97 hectare temporary/interim surface
parking lot. The subject property is located on the lands known municipally as 9 Millway
Avenue, in the City of Vaughan.
CFN: 61805 - Application #: 0655/19NAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: July 5, 2019
QUALITY SEEDS - Humber River Watershed
The purpose is to undertake works within a Regulated Area of the Humber River Watershed in
order to facilitate the alteration and enclosure of a headwater drainage feature (swale) located
within Planning Block 57/58 West at 8400 Huntington Road, in the City of Vaughan.
CFN: 61586 - Application #: 0532/19/VAUG
Report Prepared by: Mark Andrews, extension 5936, email mark.andrews@trca.ca
For information contact: Mark Andrews, extension 5936, email mark.andrews@trca.ca
Date: June 13, 2019
REGIONAL MUNICIPALITY OF YORK - Don River Watershed
The purpose is to undertake emergency culvert replacement works on a cross culvert at the
West Don River crossing of Major Mackenzie Drive West, approximately 170 m east of
McNaughton Road/Avro Road intersection, in the City of Vaughan. The proposed works involve
removal of an existing 4.7 m x 3.3 m corrugated steel pipe arch (CSPA) culvert and installation
of a 6.0 m x 3.5 m precast concrete box culvert. A separate 6.0 m x 3.0 m precast concrete box
culvert will be installed to facilitate a pedestrian crossing for future trail connection. The
proposed works also include realignment of the channel at the inlet of the culvert by
approximately 5 m to the west to accommodate the proposed culvert alignment. This permit is in
accordance with TRCA Permission for Emergency Infrastructure Works Review Protocol
(Authority Res. #A105/15).
CFN: 59139 - Application #: 1426/17NAUG
Report Prepared by: Harsimrat Pruthi, extension 5744, email harsimrat.pruthi@trca.ca
For information contact: Harsimrat Pruthi, extension 5744, email
harsimrat. pruthi@trca.ca
Date: June 7, 2019
134 RAINBOW DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed, in order to facilitate the construction of a replacement retaining wall structure
measuring 10.8 metres in length and 3.0 metres in height. The subject property is located on
lands known municipally as 134 Rainbow Drive, in the City of Vaughan.
CFN: 57367 - Application #: 0135/17NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: February 8, 2017
139 THORNRIDGE ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River watershed in
order to facilitate the construction of a 297.8 sq. m (3206 sq. ft.) replacement dwelling, on lands
known municipally as 139 Thornridge Drive, in the City of Vaughan.
CFN: 61822 - Application #: 0698/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Anthony Syhlonyk, extension 5272, email
anthony.syhlonyk@trca.ca
Date: July 10, 2019
99 WAKELIN COURT - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 53.5 sq. m. (576 sq. ft.) in ground pool and 8.9 sq. m. (95.8 sq. ft.) cabana on
lands known municipally as 99 Wakelin Court, in the City of Vaughan.
CFN: 61396 - Application #: 0389/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Coreena Smith, extension 5269, email coreena.smith@trca.ca
Date: April 22, 2019
77 CLARENCE STREET - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a replacement 2 storey residential dwelling with a footprint of 239.4 sq. m. (2572
sq. ft.) on lands known municipally as 77 Clarence Street, in the City of Vaughan.
CFN: 61470 - Application #: 0466/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: May 14, 2019
TOWN OF AJAX
ANASEC HOLDINGS LTD. - Carruthers Creek Watershed
The purpose is to construct a two storey dwelling with associated servicing located at 289 5th
Concession Road in the Town of Ajax.
CFN: 60954 - Application #: 0042/19/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 11, 2019
TOWN OF CALEDON
0 MOUNT PLEASANT ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to construct a 511 square metre (5,500 sq. ft.) single family dwelling, septic
system and driveway on a vacant lot of record on the west side of Mount Pleasant Road, north
of Old Church Road in the Town of Caledon.
CFN: 60990 - Application #: 0527/191CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 26, 2019
9213 CASTLEDERG SIDEROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 112.9 sq.m (1,216 sq.ft) detached garage
located on an existing residential property at 9213 Castlederg Sideroad in the Town of Caledon.
The works are associated with a municipal Site Plan application (Town File: SPA 19-0010) and
building permit.
CFN: 61493 - Application #: 0483/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 26, 2019
131 HEMLOCK STREET - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 41.66 sq.m (448 sq.ft) two-storey addition
to the existing dwelling located at 131 Hemlock Street in the Town of Caledon. The works are
associated with a municipal Minor Variance application (Town File: A027/19) and building
permit.
CFN: 61615 - Application #: 0576/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 25, 2019
7437 CASTLEDERG SIDEROAD - Humber River Watershed
The purpose is to undertake work within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 19.8 m by 17.7 m (64.9 ft by 58.1 ft) garage
and driveway to the east of an existing residential dwelling associated with Site Plan Application
(Town File #SPA -18-0048) and municipal building permit. The subject property is located at
7437 Castlederg Sideroad, in the Town of Caledon.
CFN: 60377 - Application #: 0936/18/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 11, 2019
13195 AIRPORT ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 357.90 sq. m (3,852.4 sq. ft.) one
storey single family dwelling and attached two car garage associated with a municipal building
permit. The subject property is located at 13195 Airport Road, in the Town of Caledon.
CFN: 60147 - Application #: 0766/181CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 23, 2018
HIRA CUSTOM HOMES - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to construct a 515.75 square metre (5551.49 square foot) single dwelling,
including a new septic system and other site works, associated with a municipal building permit.
The subject property is located at 0 Innis Lake Road in the Town of Caledon.
CFN: 61492 - Application #: 0482/19/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 20, 2019
MAYFIELD ROAD PORTFOLIO INC. - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of a 31,853 square metre industrial warehouse
building, parking area, and associated grading and servicing on the south side of Abbotside
Way associated with a municipal site plan application.
CFN: 61306 - Application #: 0362/19/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: July 17, 2019
MAYFIELD ROAD PORTFOLIO INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the construction of two industrial warehouse buildings totalling
16,979.85 square metres, located on Abbotside Way in the Town of Caledon associated with a
municipal site plan application..
CFN: 61774 - Application M 0658/19/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: July 15, 2019
2 RUTLAND HILL COURT - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to construct a 455 square metre single detached dwelling with an attached
garage, an inground swimming pool, a 13.5 square metre shed, and a septic system on 2
Rutland Hill Court, in the Town of Caledon associated with a Niagara Escarpment Commission
permit.
CFN: 61613 - Application M 0574/19/CAL
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 26, 2019
PEACE RANCH - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the installation of drainage swales, an infiltration trench,
soakaway pit, spillway and site grading as part of a wetland restoration project located at 19179
Centreville Creek Road, Caledon.
CFN: 61483 - Application M 0460/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 18, 2019
17320 Highway 50 - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the replacement of an existing septic filter bed system located at
the front of the subject property associated with a municipal building permit application. The
subject property is located at 17320 Highway 50, in the Town of Caledon.
CFN: 61919 - Application M 0757/19/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 26, 2019
9988 OLD CHURCH ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 9.94 m by 10.48 m (32.60 ft by 34.39 ft)
second storey addition to the existing residential building and septic system replacement,
associated with a municipal building permit. The subject property is located at 9988 Old Church
Road. in the Town of Caledon.
CFN: 61016 - Application #: 0110/19/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 13, 2019
24 TERRASTONE COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 4.8 m (16 ft) by 9.7 m (32 ft) in ground
swimming pool and patio at the rear of an existing dwelling located at 24 Terrastone Court in the
Town of Caledon. The works also include the construction of a 18 sq.m (195 sq.ft) deck around
an existing shed and are associated with a municipal building permit.
CFN: 60992 - Application #: 0542/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: July 25, 2019
TOWN OF WHITCHURCH-STOUFFVILLE
2022988 ONTARIO INC. AND 2036737 ONTARIO INC - Duff ins Creek Watershed
The purpose is to undertake works with TRCA's Regulated Area of the Duffins and Rouge River
Watersheds in order to facilitate servicing and development works associated with Draft
Approved Plans of Subdivision 19T-86101 and 19T-83015. The subject property is located in
Part of Lot 9 & 10, Concession 9, South of Bloomington and East of Ninth Line, in the Town of
W hitchurch-Stouffville.
CFN: 61125 - Application #: 0195/19NVS
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: March 3, 2019
4259 BETHESDA SIDE ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
watershed in order to facilitate the development of a replacement single family dwelling with a
footprint of approximately 417 sq. m. (4488 sq. ft.), an expanded driveway, and a new deck on
lands known municipally as 4259 Bethesda Side Road, in the Town of Whitchurch-Stouffville.
CFN: 61643 - Application #: 0575/19NVS
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: June 17, 2019
SAVENA COVE HOMES INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Duff ins Creek and
Rouge River Watersheds in order to facilitate preliminary grading and filling activities and
installation of erosion and sediment controls in draft approved plan of subdivision 19T(W)-
17.002, which is located on lands known municipally as 12785 Ninth Line, in the Town of
W hitchurch-Stouffville.
CFN: 61469 - Application #: 0445/191WS
Report Prepared by: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: May 5, 2019
TOWNSHIP OF KING
40 OLD CHURCH ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 203.0 sq.m. (2,185.07 sq.ft.) two
storey dwelling. The existing deck and sunroom from the existing dwelling are proposed to be
retained as part of the redevelopment proposal, and a replacement septic system is proposed.
The works are located at the property municipally known as 40 Old Church Road, and are
associated with a municipal building permit.
CFN: 58033 - Application #: 0666/171KING
Report Prepared by: Polina Barn, extension 5256, email polina.bam@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: June 13, 2019
86 RUSSELL SNIDER DRIVE - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 63.6 sq. m. (684.5 sq. ft.) in ground pool, patio, and landscape retaining walls,
on lands known municipally as 86 Russell Snider Drive, in the Township of King.
CFN: 61765 - Application #: 0640/191KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: July 2, 2019
SPRINGREEN HOLDINGS LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 262.03 sq.m. (2,820 sq. ft.) commercial
building, parking lot area and stormwater management infrastructure. The subject property is
located on lands known municipally as 10 Spring Hill Drive, in the Township of King.
CFN: 61739 - Application #: 0604/19/KING
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 26, 2019
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for Routine Infrastructure Works, including Emergency Infrastructure Works
permissions, are subject to authorization by staff designated as Enforcement Officers as per
Authority Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure
works are located within a regulated area, generally within or adjacent to the hazard or natural
feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Goreway Drive south of Steeles Avenue and north of the CN Railway tracks, in the City of
Brampton, Mimico Creek Watershed as located on the property owned by the City of Brampton.
The purpose is to install a 4 inch diameter conduit along Goreway Drive south of Steeles
Avenue and north of the CN Railway tracks, in the City of Brampton. No in -water work is
associated with this project.
CFN: 61077 - Application #: 0163/19/BRAM
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: July 23, 2019
CITY OF MARKHAM
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along the north side of Elgin Street, between 59 Elgin Street and Alcain Court, and at 59 Elgin
Street, in the City of Markham, Don River Watershed as located on property owned by a private
landowner to whom Enbridge Gas Inc. is providing service at their request and on property
owned by the City of Markham as per the franchise agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 PE IP gas pipeline at 59 Elgin Street and a NPS 1 PE IP gas
pipeline along the north side of Elgin Street, between 59 Elgin Street and Alcain Court, in the
City of Markham. No in -water work is associated with this project.
CFN: 61100 - Application #: 0182/19/MARK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
Date: June 26, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
crossing below a culvert on the north side of Personna Boulevard, approximately 380 metres
east of Woodbine Avenue, in the City of Markham, Rouge River watershed as located on the
property owned by the City of Markham as per the franchise agreement with Enbridge Gas Inc.
The purpose is to install a NPS 2 PE IP gas pipeline crossing below a culvert on the north side
of Personna Boulevard, approximately 380 metres east of Woodbine Avenue, in the City of
Markham. The Redside Dace construction timing window applies to this project unless
otherwise stated in writing by the Ministry of the Environment, Conservation and Parks (MECP).
CFN: 61683 - Application #: 0629/19/MARK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gamman pila@trca.ca
Date: July 5, 2019
CITY OF PICKERING
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Old Brock Road, north of Hoxton Street, and at 5321 Old Brock Road, in the City of
Pickering, Duffins Creek Watershed as located on property owned by a private landowner to
whom Enbridge Gas Inc. is providing service at their request and on property owned by the
Regional Municipality of Durham as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 2 PE IP gas pipeline along Old Brock Road, north of Hoxton Street,
and a NPS 1 PE IP gas pipeline at 5321 Old Brock Road, in the City of Pickering. No in -water
work is associated with this project.
CFN: 61519 - Application #: 0528119/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca
Date: July 12, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Squires Beach Road, from Bayly Street to approximately 130 m north of Kellino Street, in
the City of Pickering, Frenchman's Bay Watershed as located on property owned by the City of
Pickering under franchise agreement with Enbridge Gas Inc. The purpose is to install a NPS 4
ST DFBE HP gas pipeline along Squires Beach Road, from Bayly Street to approximately 130
m north of Kellino Street, in the City of Pickering. No in -water work is associated with this
project.
CFN: 61680 - Application #: 0615/19/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: July 23, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Morden Lane and Krosno Boulevard approximately 280 metres west of Sandy Beach Road,
in the City of Pickering, Frenchman's Bay Watershed as located on the property owned by the
City of Pickering. The purpose is to install a 100 mm diameter Rogers Communications conduit
along Kronso Boulevard and Morden Lane crossing below a converted watercourse,
approximately 280 metres west of Sandy Beach Road, in the City of Pickering. The warm water
construction timing window applies to this project.
CFN: 59529 - Application #: 0299/18/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: July 12, 2019
TRANS -NORTHERN PIPELINES INC.
To undertake structure maintenance on an existing Trans -Northern Pipeline Inc (TNPI) site (MP
318.29), located west of Forestream Trail and east of Whites Road, City of Pickering, Duffins
Creek Watershed, as located on the property owned by Her Majesty the Queen in Right of
Ontario as represented by the Minister of Government and Consumer Services, as represented
by Ontario Infrastructure and Lands Corporation. The purpose is to undertake an integrity dig to
conduct repairs on an existing pipeline at a Trans -Northern Pipelines Inc. site (MP 318.29),
located west of Forestream Trail, and east of Whites Road, within the City of Pickering. No in -
water works are associated with this project.
CFN: 61238 - Application #: 03211191PICK
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: July 15, 2019
TRANSNORTHERN PIPELINES INC.
To undertake structure maintenance on an existing Trans -Northern Pipeline Inc (TNPI) site (MP
313.58), located east of Westney Road North nd north of Fielding Court, within the Town of
Ajax., Duffins Creek Watershed, as located on the property owned by Her Majesty the Queen in
Right of Ontario as represented by the Minister of Government and Consumer Services, as
represented by Ontario Infrastructure and Lands Corporation and on property owned by private
landowners. The purpose is to undertake an integrity dig to conduct repairs on an existing
pipeline at a Trans -Northern Pipelines Inc. site (MP 313.58), located east of Westney Road
North, and north of Fielding Court, within the Town of Ajax. No in -water works are associated
with this project.
CFN: 61237 - Application #: 0322/19/PICK
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: July 15, 2019
CITY OF RICHMOND HILL
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
within new subdivisions east of Bayview Avenue and north of Elgin Mills Road, in the City of
Richmond Hill, Rouge River Watershed as located on property owned by the City of Richmond
Hill as per the franchise agreement with Enbridge Gas Inc. The purpose is to install NPS 2,
NPS 4, and NPS 6 PE IP gas pipelines on various roadways within new subdivisions east of
Bayview Avenue and north of Elgin Mills Road, in the City of Richmond Hill. No in -water work is
associated with this project.
CFN: 61262 - Application #: 0359/191RH
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 23, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance on several roadways in a
new subdivision southwest of Bayview Avenue and Glen Meadow Lane, in the City of Richmond
Hill, Rouge River Watershed as located on property owned by the City of Richmond Hill as per
the franchise agreement with Enbridge Gas Inc. The purpose is to install a NPS 1 1/4 PE IF
gas pipeline on several roadways in a new subdivision southwest of Bayview Avenue and Glen
Meadow Lane, in the City of Richmond Hill. No in -water work is associated with this project.
CFN: 61664 - Application #: 0594/191RH
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 23, 2019
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structures general maintenance near 39 King Road, 200 metres west of
Yonge Street, in the City of Richmond Hill, Humber River Watershed as located on property
owned by the Regional Municipality of York. The purpose is to undertake culvert cleaning and
flushing at a cross culvert on King Road, 200 metres west of Yonge Street; at a culvert on the
south side of King Road, 210 metres west of Yonge Street; and at a driveway culvert on the
south side of King Road, 240 metres west of Yonge Street; in the City of Richmond Hill. The
ditches located at the inlets and outlets of the culverts will also be cleaned. The Ministry of
Environment, Conservation, and Parks (MECP) Redside Dace timing window will apply to this
project, unless otherwise specified in writing by MECP.
CFN: 61795 - Application #: 0650/19/RH
Report Prepared by: Ron Ofer, extension 5798, email ron.ofer@trca.ca
For information contact: Harsimrat Pruthi, extension 5744, email
h a rs i m rat. p r u t h i @t rc a. c a
Date: July 9, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer and watermain or utility watercourse crossing by trenchless technology
under the German Mills Creek at Major Mackenzie Drive East, between Pugsley Avenue and
Cedar Avenue, in the City of Richmond Hill, Don River Watershed as located on property owned
by the Regional Municipality of York. The purpose is to undertake a communication conduit
installation under the German Mills Creek at Major MacKenzie Drive East, between Pugsley
Avenue and Cedar Avenue. There are no in -water works involved within the scope of this
project.
CFN: 61772 - Application #: 0643/191RH
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 17, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 25 Dallner Road, in the City of Toronto (Etobicoke York Community Council Area), Humber
River Watershed as located on private property with permission obtained. The purpose is to
install a new communications conduit for Bell Canada, on 25 Dallner Road, in the City of
Toronto. No in -water works is within the scope of this project.
CFN: 61529 - Application #: 0617/19/TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: July 12, 2019
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along the West Humber River Trail, near Martin Grove Road and Finch Avenue West, in the City
of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on
property owned by the City of Toronto and the Toronto and Region Conservation Authority
under management agreement with the City of Toronto. The purpose is to undertake structural
lining of an existing CSP storm sewer along the West Humber River Trail, near Martin Grove
Road and Finch Avenue West, in the City of Toronto. No in -water work is within the scope of
this project.
CFN: 57574 - Application #: 0073/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 11, 2019
CITY OF TORONTO
To undertake structure maintenance at the Northwood Community Centre located at 15
Clubhouse Court, near Jane Street and Sheppard Avenue West, in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed as located on property
owned by the City of Toronto. The purpose is to undertake building repairs and staircase
replacement at the Northwood Community Centre located at 15 Clubhouse Court, near Jane
Street and Sheppard Avenue West, in the City of Toronto. No in -water work is within the scope
of this project.
CFN: 61346 - Application #: 0348/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 11, 2019
COGECOPEER 1
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Humberwood Boulevard, between Humberline Drive and Rexdale Boulevard, in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on
property owned by the City of Toronto. The purpose is to install new communication conduit
and communication poles on Humberwood Boulevard, between Humberline Drive and Rexdale
Boulevard, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61361 - Application #: 0408/19/TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: June 17, 2019
COGECO PEER 1
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Todd Baylis Boulevard and Trethewey Drive, near Black Creek Drive and Eglinton Avenue
West, in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed as located on property owned by the City of Toronto. The purpose is to install new
communication conduit on Todd Baylis Boulevard and Trethewey Drive, near Black Creek Drive
and Eglinton Avenue West, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 61507 - Application #: 04781191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 22, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Silver Shadow Path, south of Burnhamthorpe Road, between Mill Road and Saturn Road in
the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed, as
located on property owned by a private landowner to whom Enbridge Gas Inc. is providing
service at their request, and on property owned by the City of Toronto as per the Franchise
Agreement with Enbridge Gas Inc. The purpose is to install a NPS 2 PE IP gas pipeline along
Silver Shadow Path, south of Burnhamthorpe Road between Mill Road and Saturn Road in the
City of Toronto. No in -water work is associated with this project.
CFN: 61383 - Application #: 0451/19/TOR
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 6, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Lake Shore Boulevard West, between Forty Second Street and Island Road, in the City of
Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on
property owned by the City of Toronto. The purpose is to install new communication conduit, a
vault and a split LID on Lake Shore Boulevard West, between Forty Second Street and Island
Road, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61159 - Application #: 0249/191TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: June 21, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Bermondsey SanitaryTrunk Sewer, located south of Old Eglinton Avenue, from west of
Bermondsey Road to the east of Canadian National Railway (CNR) track, in the City of Toronto
(North York Community Council Area), Don River Watershed as located on property owned by
the City of Toronto. The purpose is to rehabilitate an existing 450 mm diameter sanitary trunk
sewer, from west of Bermondsey Road to the east of Canadian National Railway (CNR) track,
south of Old Eglinton Avenue, in the City of Toronto. No in -water works are within the scope of
this project.
CFN: 60920 - Application #: 0103/191TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
Date: July 15, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Brookbanks Drive and Underhill Drive, near York Mills Road and Don Valley Parkway, in the
City of Toronto (North York Community Council Area), Don River Watershed as located on
property owned by the City of Toronto. The purpose is to install new vaults and communication
conduits for Rogers Communications Canada Inc. on Brookbanks Drive and Underhill Drive,
near York Mills Road and Don Valley Parkway, in the City of Toronto. No in -water work is within
the scope of this project.
CFN: 59836 - Application #: 0517/181TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: July 12, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Don Mills Road, between Duncan Mill Road and Havenbrook Boulevard, in the City of
Toronto (North York Community Council Area), Don River Watershed as located on property
owned by the City of Toronto. The purpose is to install new vault and communication conduit
for Rogers Communications Canada Inc. on Don Mills Road, between Duncan Mill Road and
Havenbrook Boulevard, in the City of Toronto. No in -water works is within the scope of this
project.
CFN: 61245 - Application #: 0332/191TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: July 12, 2019
TORONTO HYDRO ELECTRIC SYSTEM LIMITED
To undertake utility pole installation on Dellbank Road and Overbrook Place, near Finch Avenue
West and Bathurst Street, in the City of Toronto (North York Community Council Area), Don
River Watershed as located on property owned by the City of Toronto. The purpose is to
undertake hydro pole replacement and overhead line transfer on Dellbank Road and Overbrook
Place, near Finch Avenue West and Bathurst Street, in the City of Toronto. No in -water work is
within the scope of the project.
CFN: 61365 - Application #: 0414/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 20, 2019
YORK UNIVERSITY
To undertake stormwater management pond maintenance on 1 Shoreham Drive, just south of
Shoreham Drive and west of Pond Drive, in the City of Toronto (North York Community Council
Area), Humber River Watershed as located on property owned by York University. The purpose
is to undertake routine storm water management pond maintenance including sediment removal
on 1 Shoreham Drive, just south of Shoreham Drive and west of Pond Drive, in the City of
Toronto. The warm water construction timing window will apply to this project.
CFN: 61258 - Application #: 0343/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 11, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Brimley Road, from north of
Progress Avenue to Huntingwood Drive, and on Huntingwood Drive, from Brimley Road to
Kennedy Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed as located on property owned by the City of Toronto. The purpose is to undertake
roadway resurfacing along Brimley Road, from north of Progress Avenue to Huntingwood Drive,
and on Huntingwood Drive, from Brimley Road to Kennedy Road, in the City of Toronto. No in -
water work is within the scope of this project.
CFN: 60243 - Application #: 0923/18/TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 27, 2019
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Birchmount Road, from 30 m north
of Finch Avenue East to 50 m south of McNicoll Avenue, in the City of Toronto (Scarborough
Community Council Area), Highland Creek Watershed as located on property owned by the City
of Toronto. The purpose is to undertake roadway resurfacing along Birchmount Road, from 30
m north of Finch Avenue East to 50 m south of McNicoll Avenue, in the City of Toronto. No in -
water work is within the scope of this project.
CFN: 60244 - Application #: 0922/181TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 27, 2019
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along the Dorset Park Creek, located between Ellesmere Road and Lawrence Avenue East,
from west of Kennedy Road to Midwest Road, in the City of Toronto (Scarborough Community
Council Area), Highland Creek Watershed as located on property owned by the City of Toronto
and a private property from whom the City of Toronto has obtained an easement. The purpose
is to rehabilitate an existing 675 mm diameter sanitary trunk sewer and 15 maintenance holes
along the Dorset Park Creek, located between Ellesmere Road and Lawrence Avenue East,
from west of Kennedy Road to Midwest Road, in the City of Toronto. The warm water
construction timing window of July 1st to March 31st applies to this project.
CFN: 60899 - Application #: 0099/191TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: July 22, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 321 Scarborough Golf Club Road, in the City of Toronto (Scarborough Community Council
Area), Highland Creek Watershed, as located on property owned by the City of Toronto under a
franchise agreement with Enbridge Gas Inc. and on private property for whom Enbridge Gas
Inc. is providing service. The purpose is to install a NPS 2 PE IF gas pipeline located at 321
Scarborough Golf Club Road in the City of Toronto. No in -water work is associated with this
project.
CFN: 61364 - Application #: 0413/19/TOR
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: June 21, 2019
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Invergordon Avenue and on Tineta Crescent, approximately 285 metres east of McCowan
Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek
Watershed as located on property owned by the City of Toronto as per the Franchise
Agreement with Enbridge Gas Inc. The purpose is to install a NPS 2 PE IP gas pipeline on
Invergordon Avenue and on Tineta Crescent, approximately 285 metres east of McCowan
Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 61538 - Application #: 0562/19/TOR
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
Date: July 8, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Brookmill Boulevard, between Bridletowne Circle and La Peer Boulevard, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on
property owned by the City of Toronto. The purpose is to install communication conduit for
Rogers Communications Canada Inc. on Brookmill Boulevard, between Bridletowne Circle and
La Peer Boulevard, in the City of Toronto. No in -water works is within the scope of this project.
CFN: 61261 - Application #: 0360/19/TOR
Report Prepared by: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
For information contact: Tayo Apampa, extension 5650, email tayo.apampa@trca.ca
Date: July 11, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Oasis Boulevard, between Raponi Circle and Grackle Trail, in the City of Toronto
(Scarborough Community Council Area), Rouge River Watershed as located on property owned
by the City of Toronto. The purpose is to install a new communication conduit and a new
manhole on Oasis Boulevard, between Raponi Circle and Grackle Trail, in the City of Toronto.
No in -water work or near -water works are within the scope of this project.
CFN: 61362 - Application #: 0423/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 26, 2019
TORONTO HYDRO ELECTRIC SYSTEM LTD.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Silver Springs Boulevard, near Birchmount Road and Finch Avenue East, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on
property owned by the City of Toronto. The purpose is to undertake construction of new duct
banks on Silver Springs Boulevard, near Birchmount Road and Finch Avenue East, in the City
of Toronto. No in -water work is within the scope of this project.
CFN: 61512 - Application #: 0479/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 3, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Palisades and Valleymede Road, between Kennedy Avenue and Ellis Park Road, in the City
of Toronto (Toronto and East York Community Council Area), Humber River Watershed as
located on property owned by the City of Toronto. The purpose is to undertake replacement of
an existing 150 mm diameter watermain with a new 150 mm diameter watermain on Palisades
and Valleymede Road, between Kennedy Avenue and Ellis Park Road, in the City of Toronto.
No in -water work is within the scope of this project.
CFN: 61106 - Application #: 02151191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 22, 2019
CITY OF VAUGHAN
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 10180 and 10150 Pine Valley Drive, approximately 450 metres north of Major Mackenzie
Drive, in the City of Vaughan, Humber River Watershed, as located on the properties owned by
private landowners to whom Enbridge Gas Inc. is providing service at their request; on private
property where Enbridge Gas Inc. is in the process of obtaining an easement; and on property
owned by the City of Vaughan as per the franchise agreement with Enbridge Gas Inc. The
purpose is to install a NPS 2 ST YJ HP gas pipeline at 10180 and 10150 Pine Valley Drive,
approximately 450 metres north of Major Mackenzie Drive, in the City of Vaughan. No in -water
work is associated with this project.
CFN: 61678 - Application #: 0616/191VAUG
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: July 17, 2019
TOWNSHIP OF KING
REGIONAL MUNICIPALITY OF YORK
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on King Road, approximately 400m west of Weston Road, in the Township of King, Humber
River Watershed as located on property owned by The Regional Municipality of York. The
purpose is to undertake emergency culvert replacement works on a cross culvert on King Road,
approximately 400 m west of Weston Road, in the Township of King. The proposed works
involve removal of an existing 11 00m diameter corrugated steel pipe (CSP) cross culvert and
installation of a culvert of the same type and size. This permit is in accordance with TRCA
Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15).
The Ministry of Environment, Conservation, and Parks (MECP) Redside Dace timing window
will apply to the project, unless otherwise specified in writing by MECP.
CFN: 61684 - Application #: 0620/19/KING
Report Prepared by: Ron Ofer, extension 5798, email ron.ofer@trca.ca
For information contact: Harsimrat Pruthi, extension 5744, email
harsimrat. pruthi@trca.ca
Date: June 26, 2019
ISSUED
Permission for Minor Works Letter of Approval are issued for works located within a regulated
area, adjacent to a natural feature or natural hazard, that do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land. Permissions include ancillary
structures such as decks, garages, sheds, pools and minor fill placement/landscaping.
CITY OF BRAMPTON
34 COOKVIEW DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 139, Plan M1934, (34 Cookview Drive),
in the City of Brampton, Etobicoke Creek Watershed.
CFN: 61603 - Application #: 0538/19/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 26, 2019
48 HAVILAND CIRCLE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 84, Plan M1821, (48 Haviland Circle), in
the City of Brampton, Humber River Watershed.
CFN: 61617 - Application #: 0618/19/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 18, 2019
31 RUBY SILVER DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 63, Plan 43R-28446, (31 Ruby Silver
Drive), in the City of Brampton, Humber River Watershed.
CFN: 61604 - Application #: 0551/19/BRAM
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 25, 2019
10 SANDPIPER COURT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 48, Plan M520, (10 Sandpiper Court), in
the City of Brampton, Etobicoke Creek Watershed.
CFN: 61606 - Application #: 0553/19113RAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 26, 2019
69 HAVILAND CIRCLE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 83, Plan
43M-1750, (69 Haviland Circle), in the City of Brampton, Humber River Watershed.
CFN: 61776 - Application #: 0651/19/13RAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: July 24, 2019
32 CORAL REEF CRESCENT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 32, Plan 43M-1298, (32 Coral Reef
Crescent), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 61605 - Application #: 0552/19/13RAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: June 26, 2019
20 TEMPLETON COURT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 59, Plan M1771, (20 Templeton Court),
in the City of Brampton, Humber River Watershed.
CFN: 61863 - Application #: 0713/191BRAM
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 18, 2019
32 SKYLAR CIRCLE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 87, 34M-1677 Lot 33, Plan M539, (32
Skylar Circle), in the City of Brampton, Humber River Watershed.
CFN: 61768 - Application #: 0630/19/BRAM
Report Prepared by: Andrea Terella, extension 5657, email and rea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 11, 2019
8 PECAN DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 13, Plan 43M-1652, (8 Pecan Drive), in
the City of Brampton, Humber River Watershed.
CFN: 61921 - Application #: 0734/19/13RAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: July 24, 2019
CITY OF MISSISSAUGA
4284 GREYBROOK CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 19, Part 2,
Part 61, Plan 43R8650, (4284 Greybrook Crescent), in the City of Mississauga, Etobicoke
Creek Watershed.
CFN: 60993 - Application #: 0535/19/MISS
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 3, 2019
CITY OF PICKERING
1753 SPARTAN COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan
40M-2023, (1753 Spartan Court), in the City of Pickering, Petticoat Creek Watershed.
CFN: 61607 - Application #: 0554/19/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 2, 2019
CITY OF RICHMOND HILL
31 MAGDALAN CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 18, Plan
65M-4279, (31 Magdalan Crescent), in the City of Richmond Hill, Humber River Watershed.
CFN: 61757 - Application #: 0683/191RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 16, 2019
29 SANDBANKS DRIVE
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 64, EYS Lot 33, Plan 65M-
3588, (29 Sandbanks Drive), in the City of Richmond Hill, Humber River Watershed.
CFN: 61751 - Application #: 0663/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 16, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
51 THICKET ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 65, Plan M-
1097, (51 Thicket Road), in the City of Toronto (Etobicoke York Community Council Area),
Etobicoke Creek Watershed.
CFN: 61745 - Application #: 0612/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 26, 2019
10 BEATTIE AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 44, Plan 2328, (10 Beattie Avenue), in
the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 61646 - Application #: 0570/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 20, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
35 GLENGROVE AVENUE EAST
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Part Lot 4, Concession 1, (35 Glengrove Avenue East),
in the City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 61746 - Application #: 0614/19/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 5, 2019
CITY OF VAUGHAN
58 HUMBERWOOD GATE
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 11, Plan 65M3116, (58
Humberwood Gate), in the City of Vaughan, Humber River Watershed.
CFN: 61750 - Application #: 0662/19NAUG
Report Prepared by: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
For information contact: Anthony Syhlonyk, extension 5272, email
anthony.syhlonyk@trca.ca
Date: July 9, 2019
289 WATERSIDE CRESCENT
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 49, Plan 65M-2664, (289 Waterside Crescent), in the City of Vaughan, Don
River Watershed.
CFN: 61932 - Application #: 0765/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: August 2, 2019
8327 ISLINGTON AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 8327 Islington
Avenue, in the City of Vaughan, Humber River Watershed.
CFN: 61771 - Application #: 0641/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 9, 2019
51 THORNRIDGE DRIVE
To install a swimming pool on 51 Thornridge Drive, in the City of Vaughan, Don River
Watershed.
CFN: 61868 - Application #: 0724/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: August 2, 2019
29 COOK'S MILL CRESCENT
To install a swimming pool on 29 Cook's Mill Crescent, in the City of Vaughan, Don River
Watershed.
CFN: 60633 - Application #: 0656/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen. bon ner@trca.ca
Date: July 9, 2019
36 MARMOT COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 17,
Concession 2 Lot 53, Plan 65M-4199, (36 Marmot Court), in the City of Vaughan, Don River
Watershed.
CFN: 61917 - Application #: 0731/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 23, 2019
189 LADY NADIA DRIVE
To install a swimming pool on 189 Lady Nadia Drive, in the City of Vaughan, Don River
Watershed.
CFN: 61815 - Application #: 0687/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 16, 2019
TOWN OF CALEDON
5754 OLD SCHOOL ROAD
To construct a non -habitable accessory structure on Lot 23, Concession EAST, (5754 Old
School Road), in the Town of Caledon, Humber River Watershed.
CFN: 61614 - Application #: 0567/19/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: June 25, 2019
TOWN OF WHITCHURCH-STOUFFVILLE
35 SPOFFORD DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 17, Plan, (35
Spofford Drive), in the Town of Whitch urch-Stouffville, Rouge River Watershed.
CFN: 60634 - Application #: 0657/19/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: July 9, 2019
28 MILL STREET
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 3, Plan 47,
(28 Mill Street), in the Town of Whitch urch-Stouffville, Rouge River Watershed.
CFN: 61743 - Application #: 0613/19/WS
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: June 27, 2019
51 MAUROVISTA COURT
To install a swimming pool on Part Lot 3, Concession 9, (51 Maurovista Court), in the Town of
Whitch urch-Stouffville, Rouge River Watershed.
CFN: 61744 - Application #: 0611/19NVS
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: July 8, 2019
TOWNSHIP OF KING
32 JAMES STOKES COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Plan 65M-
4456, (32 James Stokes Court), in the Township of King, Humber River Watershed.
CFN: 61749 - Application #: 0661/191KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 9, 2019
22 ADELIA PLACE
To install a swimming pool on Lot 4, Plan 65M-4295, (22 Adelia Place), in the Township of King,
Humber River Watershed.
CFN: 61961 - Application #: 0763/19/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: August 2, 2019
92 MANITOU DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 14, Plan M14, (92 Manitou Drive),
in the Township of King, Humber River Watershed.
CFN: 61770 - Application #: 0645/191KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 9, 2019
26 BLUFF TRAIL
To install a swimming pool on Lot 115, Plan 65M-4169, (26 Bluff Trail), in the Township of King,
Humber River Watershed.
CFN: 61769 - Application #: 0639/191KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for works undertaken without the benefit of a TRCA permit in a regulated area,
where such works comply with TRCA policies and procedures, are considered permits after the
fact and subject to an additional administrative fee.
CITY OF BRAMPTON
64 DELPORT CLOSE - Humber River Watershed
The purpose is to recognize the construction of a 6 m (20 ft) by 4.8 m (16 ft) wood deck at the
rear of an existing dwelling located at 64 Delport Close in the City of Brampton. The works were
constructed within TRCA's Regulated Area of the Humber River Watershed without the benefit
of TRCA or municipal permits. As such, an additional application fee of 100% was charged for
this "after -the -fact" permit.
CFN: 61747 - Application #: 0671/19113RAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: July 25, 2019
CITY OF MARKHAM
7 ALBION CLOSE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to resolve non-compliance to an expired TRCA Permit (C-150774) by recognizing the
construction of a garage attached to existing dwelling located at 7 Albion Close, Markham,
associated with a municipal building permit.
CFN: 61915 - Application #: 0737/19/MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 26, 2019
CITY OF PICKERING
395 WHITEVALE ROAD - Duffins Creek Watershed
The purpose is to recognize after the fact underpinning of the existing basement and
construction of a new basement walkout where a two storey single family detached dwelling is
currently located at 395 Whitevale Road in the City of Pickering.
CFN: 61420 - Application #: 0417/19/PICK
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 18, 2019
684 ALDERWOOD PLACE - Frenchman's Bay Watershed
The purpose is to legalize the construction of a detached garage to the rear of the single family
dwelling at 684 Alderwood Place in the City of Pickering.
CFN: 61035 - Application #: 0247/191PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 17, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
5 PINE CRESCENT - Don River Watershed
The purpose is to carry out site grading and construct a new two storey single detached
dwelling with an integral garage to the front and a walk -out basement at grade to the rear at 5
Pine Crescent in the City of Toronto (Toronto and East York Community Council Area). This
proposal also seeks to carry out minor landscaping, construct a new shed, and reconstruct the
patio and wooden retaining walls in the rear yard. The existing detached garage to the rear will
be demolished and the inground pool will remain.
CFN: 56317 - Application #: 0822/161TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 17, 2019
CITY OF VAUGHAN
38 THISTLE RIDGE DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the development of a 45 sq. m. (484 sq. ft.) addition to an
existing single family dwelling and a 22 sq. m. (242 sq. ft.) deck. This permit will also recognize
the construction of a shed and patio space that were constructed without TRCA or municipal
approvals. The subject property is located on lands known municipally as 38 Thistle Ridge
Drive, in the City of Vaughan.
CFN: 61395 - Application #: 0391/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: July 3, 2019
TOWNSHIP OF KING
13200 WESTON ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of stormwater management infrastructure and
remediation works involving site stabilization and restoration. The subject property is located on
lands known municipally as 13200 Weston Road, in the Township of King.
CFN: 50710 - Application M 0213/141KING
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 24, 2019
Permits for September 6, 2019 Executive Committee
Delegated Permits are processed by Planning and Development Division staff, authorized by
designated staff appointed as Enforcement Officers by the Board of Directors and received
monthly by the Executive Committee. Delegated permits are categorized as standard, routine
infrastructure works, emergency infrastructure works, minor works and permits after the
fact/resolution of violations. Standard permits are non-complex permissions consistent with
TRCA approved policies and procedures and issued for a time period of two years or less.
CITY OF BRAMPTON
24 MORRIS COURT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to complete the construction of a 840.12 sq. m. (9,043 sq. ft.) single
detached dwelling and septic system located at 24 Morris Court in the City of Brampton. The
previously issued TRCA permit for the works (Permit No. C-160952) expired in September of
2018.
CFN: 61905 - Application #: 0801/19/BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: August 8, 2019
BRAMPTON HEIGHTS DEVELOPMENTS LTD. - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the repair of an existing sanitary sewer crossing underneath
Highway 410, south of Sandalwood Parking in the City of Brampton.
CFN: 60985 - Application #: 0108/19/BRAM
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: August 21, 2019
MAYFIELD ARCADEIUM HOLDINGS LTD. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a commercial development consisting of five
(5) commercial buildings including an existing heritage building associated with an official plan
amendment, zoning by-law amendment and site plan application at 6461 Mayfield Road, in the
City of Brampton.
CFN: 61293 - Application #: 0302/19/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: August 8, 2019
OURAY DEVELOPMENTS INC. - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated of the Humber River Watershed in
order to facilitate the construction of a pedestrian trail and bridge structure associated with a
draft plan of subdivision application.
CFN: 60988 - Application #: 0530/19/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: August 1, 2019
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to install a 300 mm diameter watermain on Mayfield Road between Summer
Valley Drive and Hurontario Street in the City of Brampton. No in -water work is associated with
this project.
CFN: 61363 - Application #: 0428/1911131RAM
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 6, 2019
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to install a 400 mm diameter watermain on McVean Road between Countryside
Drive and Mayfield Road, in the City of Brampton. No in -water work is associated with this
project.
CFN: 61671 - Application #: 0582/19/BRAM
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: August 26, 2019
CITY OF MARKHAM
METROPIA (SIXTEENTH) LIMITED PARTNERSHIP - Rouge River Watershed
The purpose is to conduct topsoil stripping and rough grading associated with a residential draft
plan of subdivision within a TRCA Regulated Area of the Rouge River watershed at 4134 16th
Avenue in the City of Markham.
CFN: 61855 - Application #: 0689/19/MARK
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: July 26, 2019
166 HUNTINGTON PARK DRIVE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of two decks attached to the rear side of an existing
dwelling located at 166 Huntington Park Drive, Markham.
CFN: 61755 - Application #: 0680/19/MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 8, 2019
CITY OF MISSISSAUGA
2685994 ONTARIO INC. - Mimico Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek
Watershed in order to facilitate the construction of a 328.59 sq. m (3,537 sq. ft.) two storey
replacement dwelling with attached garage associated with a municipal building permit. The
subject property is located at 7044 Justine Drive, in the City of Mississauga.
CFN: 61775 - Application #: 0674/19/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: August 22, 2019
3135 CHURCHILL AVENUE - Mimico Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Mimico Creek
Watershed in order to facilitate the construction of a 118.14 sq. m (1,271.64 sq. ft.) replacement
dwelling with attached garage and a soakaway trench associated with a Minor Variance
application (Town File No. A 051/19) and municipal building permit. The subject property is
located at 3135 Churchill Avenue, in the City of Mississauga.
CFN: 61486 - Application #: 0487/19/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: August 20, 2019
14 YORK STREET - Mimico Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Mimico Creek
Watershed in order to facilitate the construction of a 132 square metre second storey addition to
an existing residential dwelling associated with a municipal building permit.
CFN: 61954 - Application #: 0829/19/MISS
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: August 22, 2019
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to rehabilitate an exposed sanitary sewer maintenance hole located near
Logistics Drive, north of Derry Road East and east of Bramalea Road in the City of Mississauga.
The warm water construction timing window will be applied to this project.
CFN: 60295 - Application #: 0939/18/MISS
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 22, 2019
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to rehabilitate an exposed sanitary sewer maintenance hole located near Dixie
Road just north of Courtney Park Drive East in the City of Mississauga. The warm water
construction timing window will be applied to this project.
CFN: 60296 - Application #: 0929/181MISS
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 22, 2019
REGIONAL MUNICIPALITY OF PEEL - Etobicoke Creek Watershed
The purpose is to install two watermains on Britannia Road East from Tomken Road to Atlantic
Drive in the City of Mississauga. No in -water work is associated with this project.
CFN: 60887 - Application #: 0048/19/MISS
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 20, 2019
CITY OF PICKERING
374 DYSON ROAD - Rouge River Watershed
The purpose is to construct a new two-storey single detached dwelling with an integral garage
on the residential lot at 372 Dyson Road in the City of Pickering.
CFN: 61295 - Application #: 0305/19/PICK
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 12, 2019
938 VISTULA DRIVE - Frenchman's Bay Watershed
The purpose is to construct an above grade deck at the rear of an existing two storey single
family detached dwelling located at 938 Vistula Drive in the City of Pickering.
CFN: 61872 - Application #: 0736/19/PICK
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 19, 2019
NORTH PICKERING COMMUNITY MANAGEMENT INC. (NPCMI) - Duffins Creek
Watershed
The purpose is to widen a small section of Taunton Road (Burkholder Drive to Peter Matthews
Drive) by adding turning lanes and commercial entrances for future development, in the City of
Pickering. These works are part of the servicing for the new Seaton community in the City of
Pickering and were previously reviewed through the Seaton Arterial and Collector Roads
Environmental Study Report (2017).
CFN: 61890 - Application #: 0770/19/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: July 30, 2019
CITY OF RICHMOND HILL
CITY OF RICHMOND HILL - Rouge River Watershed
The purpose is to undertake widening and re -construction of an existing sidewalk for use as a
multi -use trail. There are no in -water works involved within the scope of the project.
CFN: 61252 - Application #: 0336/19/RH
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: August 13, 2019
DEERGATE HOLDINGS INC. - Rouge River Watershed
The purpose is to site grade, temporarily or permanently place, dump or remove any material,
originating on the site or elsewhere and interfere with a wetland on Lot 31, Concession 2,
(11546 Leslie Street), in the City of Richmond Hill, Rouge River Watershed as located on the
property owned by Deergate Holdings Inc. and undertake wetland compensation on the same
property.
CFN: 60071 - Application #: 0626/18/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Quentin Hanchard, extension 5324, email
quentin.hanchard@trca.ca
Date: July 26, 2019
36 MARYVALE CRESCENT - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of an in -ground pool, hot tub, pool cabana, patio pavers on
grade, and slope restoration consisting of the removal of the top portion of existing retaining
walls (base to remain), removal of an existing pool deck (posts to remain), filling in the existing
swimming pool to match existing surrounding grade, and the installation of native plantings
located on 36 Maryvale Crescent, Richmond Hill.
CFN: 55855 - Application #: 0435/16/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 14, 2019
PARKGATE HOLDINGS INC. C/O ARMLAND GROUP - Rouge River Watershed
The purpose is to undertake works in a TRCA Regulated Area of the Rouge River watershed at
11211 Bayview Avenue, in the City of Richmond Hill to facilitate final grading and servicing, and
the implementation of sediment and erosion control measures in support of the completion of an
approved draft plan of subdivision 19T(R)-04008, associated with a municipal permit.
CFN: 61649 - Application #: 0585/191RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: August 19, 2019
REGIONAL MUNICIPALITY OF YORK - Rouge River Watershed
The purpose is to undertake widening of Leslie Street from an existing two-lane rural cross-
section to a four -lane urban cross-section between 450m north of Elgin Mills Road and 100m
south of 19th Avenue, in the City of Richmond Hill. The proposed works also include a multi -use
pathway, a sidewalk, storm sewers, catch basins, curbs and gutters and replacement of two
culverts conveying tributaries of the Rouge River. A York Telecon Network (YTN) conduit and
handwells will be installed as part of the proposed works. In water and near water works are
subject to the cold water construction timing window.
CFN: 55930 - Application #: 0261/171RH
Report Prepared by: Harsimrat Pruthi, extension 5744, email harsimrat.pruthi@trca.ca
For information contact: Harsimrat Pruthi, extension 5744, email
harsimrat. pruthi@trca.ca
Date: August 16, 2019
REGIONAL MUNICIPALITY OF YORK - Don River Watershed
The purpose is to construct temporary access roads to facilitate rehabilitation of the existing
North Don Collector sewer and associated maintenance holes between Highway 407 and
Yonge Street, in the City of Richmond Hill. The proposed works also include minor excavation
around the insertion manholes, and installation of bypass pump and pipe to allow diversion of
the flows from the existing sanitary sewer to complete the rehabilitation works. The Ministry of
Environment, Conservation and Parks (MECP) Redside Dace timing window will apply to this
proposal, unless otherwise specified in writing by MECP.
CFN: 59984 - Application #: 0568/18/RH
Report Prepared by: Harsimrat Pruthi, extension 5744, email harsimrat.pruthi@trca.ca
For information contact: Harsimrat Pruthi, extension 5744, email
harsimrat. pruthi@trca.ca
Date: August 15, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
19 SPRING GARDEN ROAD - Mimico Creek Watershed
The purpose is to construct a 2.5 storey single family detached dwelling at 19 Spring Garden
Road in the City of Toronto (Etobicoke York). The exiting dwelling is to be demolished.
CFN: 60711 -Application #: 1183/18/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: August 26, 2019
67 JELLICOE AVENUE - Etobicoke Creek Watershed
The purpose is to construct a two-storey side addition and a second storey addition over the
existing footprint at 67 Jellicoe Avenue in the City of Toronto (Etobicoke York Community
Council Area). Two existing decks located at the rear of the property are to be removed.
CFN: 59965 - Application #: 0575/181TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 29, 2019
28 RAVENSCREST DRIVE - Mimico Creek Watershed
The purpose is to construct a two-storey replacement dwelling with a deck to the rear at 28
Ravenscrest Drive in the City of Toronto (Etobicoke York Community Council Area). An existing
deck along the retaining wall is to be removed.
CFN: 61314 - Application #: 0299/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 2, 2019
FAIZAN-E-MADINA CANADA INC. - Humber River Watershed
The purpose is to construct an addition to the existing institutional building at 595 Albion Road in
the City of Toronto (Etobicoke York).
CFN: 61444 - Application #: 0398/19/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 12, 2019
FERNBROOK HOMES (LAWRENCE) LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate servicing and development associated with a residential
subdivision including 88 units at 1780 Lawrence Avenue West in the City of Toronto (Etobicoke
York).
CFN: 60312 - Application #: 0849/18/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 1, 2019
37 SNARESBROOK DRIVE - Humber River Watershed
The purpose is to facilitate construction of a replacement dwelling and a rear deck at 37
Snaresbrook Drive in the City of Toronto (Etobicoke York Community Council Area).
CFN: 60193 - Application #: 0779/181TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 9, 2019
1 FRIMETTE CRESCENT - Humber River Watershed
The purpose is to construct a second storey addition, a front porch and to increase the size of
an existing garage to the existing one -storey single family dwelling at 1 Frimette Crescent in the
City of Toronto (Etobicoke York Community Council Area).
CFN: 61327 - Application #: 0374/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 15, 2019
6 RIDGEVALLEY CRESCENT - Humber River Watershed
The purpose is to construct a new pool, hot tub and patio to the rear of the existing dwelling at 6
Ridgevalley Crescent in the City of Toronto (Etobicoke York Community Council Area). The pool
with replace an existing cantilevered deck. The proposal also includes the replacement of
retaining walls, pool canopy and the reconfiguration of stairs that go down the slope.
CFN: 61920 - Application #: 0739/191TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 14, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO - Don River Watershed
The purpose is to replace a pedestrian bridge and realign an existing asphalt pathway in
Windfields Park, near York Mills Road and Bayview Avenue, in the City of Toronto. No in -water
work is within the scope of this project.
CFN: 58615 - Application #: 0091/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 29, 2019
8 RYKERT CRESCENT - Don River Watershed
The purpose is to construct a two storey single family dwelling with rear terrace at 8 Rykert
Crescent in the City of Toronto (North York Community Council Area).
CFN: 61187 - Application #: 0211/191TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 15, 2019
394 KEEWATIN AVENUE - Don River Watershed
The purpose is to construct a main, second storey, and third storey addition to the rear, and
front third storey addition to an existing two and a half storey single family dwelling located at
394 Keewatin Drive in the City of Toronto (North York Community Council Area).
CFN: 61862 - Application #: 0717/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 15, 2019
30 SUFI CRESCENT - Don River Watershed
The purpose is to construct an above grade deck at the rear of an existing three storey single
family dwelling located at 30 Sufi Crescent in the City of Toronto (North York Community
Council Area).
CFN: 61828 - Application #: 0704/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 12, 2019
METROPOLITAN TORONTO CONDOMINIUM CORPORATION # 577 - Don River Watershed
The purpose is to repair the existing tennis court to the rear of the condominium at 75 Wynford
Heights Crescent in the City of Toronto (North York Community Council Area).
CFN: 61752 - Application #: 0670/191TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 18, 2019
RITA TSANG GROUP HOLDINGS INC. - Don River Watershed
The purpose is to construct a two storey replacement dwelling with rear covered patio and
flagstone terrace where an existing two storey single family detached dwelling is currently
located at 26 Salonica Road in the City of Toronto (North York Community Council Area).
CFN: 60552 - Application #: 1071/181TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 23, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
10725960 CANADA INC. - Highland Creek Watershed
The purpose is to construct a two storey replacement dwelling where an existing one storey
single family detached dwelling is currently located at 15 Bellehaven Crescent in the City of
Toronto (Scarborough Community Council Area).
CFN: 61787 - Application #: 0653/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 12, 2019
7 CRESCENTWOOD ROAD - Highland Creek Watershed
The purpose is to construct a deck extension and shed where an existing two storey single
family detached dwelling is currently located at 7 Crescentwood Road in the City of Toronto
(Scarborough Community Council Area).
CFN: 61785 - Application #: 0652/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 2, 2019
CITY OF TORONTO - Don River Watershed
The purpose is to replace an existing 675 mm diameter storm pipe and to reconstruct the pipe
outfall at 6 Underwriters Road, southeast of Lawrence Avenue East and Warden Avenue, in the
City of Toronto. The warm water construction timing window will apply to this project.
CFN: 57610 - Application #: 0071/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 21, 2019
NORTHVIEW APARTMENT REIT - Don River Watershed
The purpose is to construct a ground sign where a multi -unit residential building is currently
located at 19 Rosemount Drive in the City of Toronto (Scarborough Community Council Area).
CFN: 61756 - Application #: 0681/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 18, 2019
3 ACLAND CRESCENT - Highland Creek Watershed
The purpose is to construct an above grade deck at the rear of an existing one and a half storey
single family dwelling located at 3 Acland Crescent in the City of Toronto (Scarborough
Community Council Area).
CFN: 61763 - Application #: 0626/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 1, 2019
135 MANSE ROAD - Highland Creek Watershed
The purpose is to construct a concrete patio and above grade deck at the rear of an existing
one storey single family detached dwelling located at 135 Manse Road in the City of Toronto
(Scarborough Community Council Area).
CFN: 61761 - Application #: 0627/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 2, 2019
81 PERIVALE CRESCENT - Highland Creek Watershed
The purpose is to construct a replacement sunroom to the rear of an existing one storey single
family detached dwelling located at 81 Perivale Crescent, in the City of Toronto (Scarborough
Community Council Area).
CFN: 61648 - Application #: 0580/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 19, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
225 RIVERSIDE DRIVE - Humber River Watershed
The purpose is to replace the existing deck to the rear of the existing single family detached
dwelling at 225 Riverside Drive in the City of Toronto (Toronto and East York). The existing
deck is to be removed.
CFN: 61947 - Application #: 0789/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 7, 2019
71 LOGAN AVENUE - Don River Watershed
The purpose is to construct a bay window at the front and to replace a two-storey rear addition
at 71 Logan Avenue in the City of Toronto (Toronto and East York Community Council Area).
CFN: 61925 - Application #: 0745/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 20, 2019
CITY OF TORONTO - Waterfront Watershed
The purpose is to construct an adit tunnel, a deaeration chamber and shafts that will connect to
the proposed Coxwell Bypass Tunnel at south side of Lake Shore Boulevard, just east of Carlaw
Avenue in the City of Toronto. The 4CARALES drop shaft and adit tunnel system is one of
eleven (11) wet weather flow connections (or diversion structures) designed to connect the
proposed Coxwell Bypass tunnel to existing sewer infrastructure along the Don River. There will
be no in -water works associated with this project.
CFN: 57849 - Application #: 0560/171TOR
Report Prepared by: Renee Afoom-Boateng, extension 5714, email renee.afoom-
boateng@trca.ca
For information contact: Renee Afoom-Boateng, extension 5714, email renee.afoom-
boateng@trca.ca
Date: August 6, 2019
210 PARKVIEW HILL CRESCENT - Don River Watershed
The purpose is to construct a second storey addition over the existing footprint and to replace a
rear sunroom to the one -storey single family dwelling at 210 Parkview Hill Crescent in the City
of Toronto (Toronto and East York Community Council Area).
CFN: 61856 - Application #: 0692/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 20, 2019
158 MACLEAN AVENUE - Waterfront Watershed
The purpose is to construct a two-storey rear addition, wood deck and a pergola to the two-
storey single family dwelling at 158 Maclean Avenue in the City of Toronto (Toronto and East
York Community Council Area). The proposal also involves replacement of a rear wood deck
and a side porch.
CFN: 60166 - Application #: 0776/181TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 6, 2019
9 STRATHEARN ROAD - Don River Watershed
The purpose is to construct a new two storey detached dwelling with an integral garage to the
front and a basement walk -out at grade to the rear at 9 Strathearn Road in the City of Toronto
(Toronto and East York Community Council Area). This proposal also includes an elevated
astroturr greenspace, inground pool and patios to the rear of the new dwelling. A stormwater
storage tank will be constructed below the proposed patio on the south side of the dwelling.
CFN: 56316 - Application #: 0763/161TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 12, 2019
QUEEN LESLIE DEVELOPMENTS LIMITED - Don River Watershed
The purpose is to construct a six storey mixed used building with one level of below grade
parking, retail at grade, and 69 residential units on floors two to six at 1285 Queen Street East in
the City of Toronto (Toronto & East York Community Council Area). The existing building is to
be demolished.
CFN: 61930 - Application #: 0758/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 26, 2019
CITY OF VAUGHAN
602596 ONTARIO LIMITED - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the
development of a 406 sq. m. (4371 sq. ft.) dwelling and septic system on lands known
municipally as 6550 King -Vaughan Road, in the City of Vaughan.
CFN: 61443 - Application #: 0399/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: April 23, 2019
14 RIVERSIDE BOULEVARD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the development of a 353 sq. m. (3799 sq. ft.) two storey residential dwelling
and a 37 sq. m. (398 sq. ft.) deck. The subject works are located on lands known municipally as
14 Riverside Boulevard, in the City of Vaughan.
CFN: 61867 - Application #: 0726/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 15, 2019
NASHVILLE DEVELOPMENTS INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate site alteration works including topsoil stripping and preliminary
grading in a draft approved plan of subdivision (19T -17V007) also known as Barons West
Property, located in Block 61 West, on lands known municipally as 10671 Huntington Road, in
the City of Vaughan.
CFN: 61310 - Application #: 0290/19/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Coreena Smith, extension 5269, email coreena.smith@trca.ca
Date: August 1, 2019
TOWN OF AJAX
499 RUTHEL ROAD - Carruthers Creek Watershed
The purpose is to construct a new two storey dwelling and perform site grading on a vacant lot
located at 499 Ruthel Road in the Town of Ajax.
CFN: 61778 - Application #: 0668/191AJAX
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 29, 2019
ROSS RIVER HOLDING INC. - Duffins Creek Watershed
The purpose is to install rain gardens to the rear of the 10 single detached residential lots
located at 960 Riverside Drive in the Town of Ajax.
CFN: 50058 - Application #: 0966/131AJAX
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 15, 2019
TOWN OF AJAX - Duffins Creek Watershed
The purpose is to reconstruct the existing driveway and parking lot at Greenwood Conservation
Area and install an infiltration basin at the Greenwood Discovery Pavilion, located north of
Taunton Road, west of Westney Road, at 2290 Greenwood Road, in the Town of Ajax. No in -
water work is associated with this project.
CFN: 61518 - Application #: 0507/19/AJAX
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: August 14, 2019
TOWN OF CALEDON
18270 HUMBER STATION ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 9.6 m by 19.5 m replacement septic system
at the rear of an existing dwelling located at 18270 Humber Station Road in the Town of
Caledon.
CFN: 61940 - Application #: 0775/19/CAL
Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca
For information contact: Nicholas Cascone, extension 5927, email
nicholas.cascone@trca.ca
Date: August 6, 2019
398 KING STREET EAST - Humber River Watershed
The purpose is to undertake work within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 139.33 sq.m. (1499.73 sq.ft) garage at the
front of an existing residential dwelling associated with Minor Variance Application (Town File
#A026/19) and municipal building permit. The subject property is located at 398 King Street
East, in the Town of Caledon.
CFN: 61748 - Application #: 0672/19/CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: August 20, 2019
18167 INNIS LAKE ROAD - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a replacement 1,407 square metre single
family dwelling at 18167 Innis Lake Road, in the Town of Caledon associated with a Niagara
Escarpment Commission application.
CFN: 61918 - Application #: 0751/19/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: July 26, 2019
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to install a new 600 mm diameter watermain along Coleraine Drive from Holland
Drive to Healey Road and a 400 mm diameter watermain from Healey Road to George Bolton
Parkway in the Town of Caledon. The warm water construction timing window will be applied to
this project.
CFN: 60287 - Application #: 1045/181CAL
Report Prepared by: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: November 9, 2018
TOWN OF MONO
COUNTY OF DUFFERIN - Humber River Watershed
The purpose is to construct a permanent gravel access route and re -line the existing twin cell
CSP culverts on Dufferin County Road 18 (Airport Road) located approximately 280 m north of
Kings Highway 9 in the Town of Mono. The Redside Dace timing window will apply to this
project as revised in writing by the Ministry of Natural Resources and Forestry (MNRF).
CFN: 60744 - Application #: 0024/19/MONO
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca
Date: August 7, 2019
TOWNSHIP OF KING
14270 8TH CONCESSION ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 700 sq. m. (7534 sq. ft.) single family
dwelling, a 210.5 sq. m. (2265 sq. ft.) garage, a 1164 sq. m. (12529.19 sq. ft.) garage/workshop
building and a sewage septic system. The subject property is located on lands known
municipally as 14270 8th Concession, in the Township of King.
CFN: 61962 - Application #: 0762/19/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: July 25, 2019
APPROVED AND ISSUED
Permission for Routine Infrastructure Works, including Emergency Infrastructure Works
permissions, are subject to authorization by staff designated as Enforcement Officers as per
Authority Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure
works are located within a regulated area, generally within or adjacent to the hazard or natural
feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF PICKERING
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 775 Kingston Road, approximately 125 metres east of Delta Boulevard, in the City of
Pickering, Frenchman's Bay Watershed; as located on property owned by a private landowner
to whom Enbridge Gas Inc is providing service at their request, on property owned by the
Regional Municipality of Durham under franchise agreement with Enbridge Gas Inc., and on
private property at 715 Kingston Road where a permanent easement for the work taking place
will be obtained by Enbridge Gas Inc. The purpose is to install a NPS 1 ST YJ XHP gas
pipeline at 775 Kingston Road, approximately 125 metres east of Delta Boulevard, in the City of
Pickering. No in -water work is associated with this project.
CFN: 61823 - Application #: 0707/19/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 23, 2019
TRANSNORTHERN PIPELINES INC.
To undertake structure maintenance on an existing pipeline at a Trans -Northern Pipeline Inc.
(TNPI) site (MP -318.85-2019), located west of Whites Road North and south of Taunton Road,
in the City of Pickering, Petticoat Creek Watershed as located on the properties owned by
1397442 Ontario Limited and Burkholder Farms Inc. The purpose is to undertake an integrity
dig to conduct repairs on an existing pipeline at a Trans -Northern Pipeline Inc. (TNPI) site (MP -
318.85 -2019), located west of Whites Road North and south of Taunton Road, in the City of
Pickering, Petticoat Creek Watershed as located on properties owned by 1397442 Ontario
Limited and Burkholder Farms Inc. No in -water works are associated with this project.
CFN: 61817 - Application #: 0703/19/PICK
Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca
For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca
Date: July 30, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain, utility installation or maintenance within an existing roadway on
Bonnyview Drive, south of Doddington Drive, in the City of Toronto (Etobicoke York Community
Council Area), Mimico Creek Watershed as located on property owned by the City of Toronto.
The purpose is to rehabilitate an existing 600 mm diameter storm sewer on Bonnyview Drive,
south of Doddington Drive, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 61984 - Application #: 0837/191TOR
Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca
For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca
Date: August 22, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Islington Avenue, from south of Albion Road to north of Finch Avenue West, east of Islington
Avenue, and on Finch Avenue West, east of Islington Avenue, in the City of Toronto (Etobicoke
York Community Council Area), Humber River Watershed as located on property owned by the
City of Toronto. The purpose is to install new communication conduits and new vaults for
Rogers Communications Canada Inc. on Islington Avenue, from south of Albion Road to north
of Finch Avenue West, east of Islington Avenue, and on Finch Avenue West, east of Islington
Avenue, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61849 - Application #: 0749/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 21, 2019
TORONTO HYDRO ELECTRIC SYSTEMS LTD.
To undertake utility pole installation on Rathburn Road, east of Martin Grove Road, in the City of
Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on
property owned by the City of Toronto. The purpose is to replace two hydro poles and overhead
line transfer on Rathburn Road, east of Martin Grove Road, in the City of Toronto. No in -water
work is within the scope of the project.
CFN: 61660 - Application #: 0573/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 13, 2019
TRANS -NORTHERN PIPELINES INC (TNPI)
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 195 Galaxy Boulevard, near Dixon Road and Highway 27, in the City of Toronto (Etobicoke
York Community Council Area), Mimico Creek Watershed as located on property owned by Sky -
Galaxy Golf Inc. with access granted through permission to enter. The purpose is to conduct an
integrity dig to inspect and determine the integrity of an existing pipeline, located at 195 Galaxy
Boulevard, near Dixon Road and Highway 27, in the City of Toronto. No in -water works are
within the scope of this project.
CFN: 61513 - Application #: 0470/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 1, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Duncan Mill Road, near Don Mills Road and York Mills Road, in the City of Toronto (North
York Community Council Area), Don River Watershed as located on property owned by the City
of Toronto. The purpose is to undertake emergency repair works for a burst section of
watermain on Duncan Mill Road, near Don Mills Road and York Mills Road, in the City of
Toronto. No in -water work is within the scope of this project.
CFN: 61825 - Application #: 0699/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
in Cliffside Ravine Park, east of Kingston Road, in the City of Toronto (Scarborough Community
Council Area), Waterfront Watershed as located on property owned by the City of Toronto. The
purpose is to reline an existing 300 mm diameter and 600 mm diameter CSP combined sewer
pipes in Cliffside Ravine Park, east of Kingston Road, in the City of Toronto. No in -water work is
within the scope of the project.
CFN: 60897 - Application #: 0064/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Choiceland Boulevard and Meadowvale Road, south of Ellesmere Road, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on
property owned by the City of Toronto. The purpose is to install new communication conduits
and new vaults for Rogers Communications Canada Inc. on Choiceland Boulevard and
Meadowvale Road, south of Ellesmere Road, in the City of Toronto. No in -water work is within
the scope of this project.
CFN: 61534 - Application #: 0595/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Scarborough Golf Club Road, south of Lawrence Avenue East, in the City of Toronto
(Scarborough Community Council Area), Highland Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install a new communication conduit and a new
vault for Rogers Communications Canada Inc. on Scarborough Golf Club Road, south of
Lawrence Avenue East, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 61537 - Application #: 0596/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Maplelea Road and Zaph Avenue, south of Euclid Avenue, in the City of Toronto
(Scarborough Community Council Area), Highland Creek Watershed as located on property
owned by the City of Toronto. The purpose is to install new communication conduits and a new
vault for Rogers Communications Canada Inc. on Maplelea Road and Zaph Avenue, south of
Euclid Avenue, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61670 - Application #: 0601/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on L'Amoreaux Drive, west of Birchmount Road, in the City of Toronto (Scarborough Community
Council Area), Highland Creek Watershed as located on property owned by the City of Toronto.
The purpose is to install new communication conduits and new vaults for Rogers
Communication Inc. on L'Amoreaux Drive, west of Birchmount Road, in the City of Toronto. No
in -water work is within the scope of this project.
CFN: 61831 - Application #: 0711/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction on Baby Point Crescent, Baby Point
Road and Baby Point Terrace, near Jane Street and Bloor Street West, in the City of Toronto
(Toronto and East York Community Council Area), Humber River Watershed as located on
property owned by the City of Toronto. The purpose is to undertake road reconstruction and
road resurfacing on Baby Point Road, Baby Point Crescent and Baby Point Terrace, near Jane
Street and Bloor Street West, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 61516 - Application #: 0501/19/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 6, 2019
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Cottingham Road, east of Davenport Road, in the City of Toronto (Toronto and East York
Community Council Area), Waterfront Watershed as located on property owned by the City of
Toronto. The purpose is to install a new communication conduit on Cottingham Road, east of
Davenport Road, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61668 - Application #: 0599/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2019
CITY OF VAUGHAN
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Purple Creek Road, east of Pine Valley Drive just south of Teston Road, in the City of
Vaughan, Humber River Watershed as located on the property owned by the City of Vaughan
as per the franchise agreement with Enbridge Gas Inc. The purpose is to install a NPS 2 PE IP
gas pipeline on Purple Creek Road, east of Pine Valley Drive just south of Teston Road, in the
City of Vaughan. No in -water work is associated with this project.
CFN: 61793 - Application #: 0646/19/VAUG
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Manirul Islam, extension 5715, email man iru 1. islam@trca.ca
Date: August 9, 2019
TOWN OF AJAX
BUENA VISTA DEVELOPMENT CORPORATION
To undertake off-line stormwater management pond maintenance north of Beer Crescent and
south of Achilles Road, in the Town of Ajax, Carruthers Creek Watershed as located on the
property owned by Buena Vista Development Corporation. The purpose is to undertake routine
stormwater pond maintenance including sediment removal and final grading of the facility on an
existing pond located north of Beer Crescent and south of Salem Road and Achilles Road, in
the Town of Ajax.
CFN: 61808 - Application #: 0685/19/AJAX
Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca
For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca
Date: August 9, 2019
MEDALLION DEVELOPMENTS
To undertake off-line stormwater management pond maintenance located north of Rossland
Road East and west of Carberry Crescent, in the Town of Ajax, Carruthers Creek Watershed as
located on the property owned by Medallion Developments Inc. The purpose is to undertake
off-line stormwater management pond maintenance north of Rossland Road East and west of
Carberry Crescent, in the Town of Ajax, Carruthers Creek Watershed as located on the property
owned by Medallion Developments Inc. No in -water works are associated with the project.
CFN: 61826 - Application #: 0705/19/AJAX
Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca
For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca
Date: August 21, 2019
TOWN OF AJAX
To undertake road/pathway resurfacing or reconstruction on Village Greenbelt Trail along the
eastern edge of Millers Creek, west of Westney Road and north of Jacwin Drive, in the Town of
Ajax, Duffins Creek Watershed as located on the property owned by the Town of Ajax. The
purpose is to reconstruct an existing multi -use recreational trail along the eastern edge of Millers
Creek, west of Westney Road and north of Jacwin Drive, in the Town of Ajax. No in -water work
is associated with this project.
CFN: 60924 - Application #: 0127/19/AJAX
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca
Date: August 9, 2019
TOWN OF CALEDON
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Dixie Road, approximately 1.35 kilometres north of Mayfield Road, in the Town of Caledon,
Humber River Watershed as located on the property owned by the Town of Caledon as per the
Franchise Agreement with Enbridge Gas Inc. The purpose is to install a NPS 6 PE IP gas
pipeline on Dixie Road, approximately 1.35 kilometres north of Mayfield Road, in the Town of
Caledon. The warmwater construction timing window will apply to the watercourse crossing
south of Campbell Cross Creek, and the Redside Dace construction timing window will apply to
construction adjacent to Campbell Cross Creek unless otherwise stated in writing by the
Ministry of the Environment, Conservation and Parks (MECP).
CFN: 61875 - Application #: 0779/191CAL
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: August 27, 2019
TOWNSHIP OF KING
BELL CANADA
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Norman Drive, Martin Street, Keele Street, East Humber Drive, Dennison Street, Melrose
Avenue, James Street, John Street, Hambly Avenue and King Road, in the Township of King,
Humber River Watershed as located on the property owned by the Township of King and the
Regional Municipality of York. The purpose is to install Bell Conduit on road right-of-way (ROW)
of Norman Drive, Martin Street, Keele Street, East Humber Drive, Dennison Street, Melrose
Avenue, James Street, John Street, Hambly Avenue and King Road, in the Township of King.
The Redside Dace timing window will apply to this proposal unless otherwise specified in writing
by Ministry of Environment, Conservation and Parks (MECP).
CFN: 60227 - Application #: 0665/19/KING
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: August 21, 2019
MINOR WORKS LETTER OF APPROVAL FOR RECEIPT — STAFF APPROVED AND
ISSUED
Permission for Minor Works Letter of Approval are issued for works located within a regulated
area, adjacent to a natural feature or natural hazard, that do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land. Permissions include ancillary
structures such as decks, garages, sheds, pools and minor fill placement/landscaping.
CITY OF BRAMPTON
118 NAPERTON DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Lot 12, Block 41, Plan 43M-1829, (118
Naperton Drive), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 61906 - Application #: 0804/19/BRAM
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: August 8, 2019
CITY OF MARKHAM
49 STORYBOOK CRESCENT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 16, Concession 7 Lot 120, Plan 65M-3788, (49
Storybook Crescent), in the City of Markham, Rouge River Watershed.
CFN: 61960 - Application #: 0764/19/MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 6, 2019
CITY OF MISSISSAUGA
3214 VICTORY CRESCENT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 89, Plan 828, (3214 Victory Crescent), in
the City of Mississauga, Mimico Creek Watershed.
CFN: 61789 - Application #: 0673/19/MISS
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 10, 2019
CITY OF PICKERING
636 COWAN CIRCLE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 87, Plan M-
1189, (636 Cowan Circle), in the City of Pickering, Petticoat Creek Watershed.
CFN: 61854 - Application #: 0684/19/PICK
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 18, 2019
1879 PINECREEK COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 8, 23,
24, Plan 40R5584, (1879 Pinecreek Court), in the City of Pickering, Frenchman's Bay
Watershed.
CFN: 61942 - Application #: 0773/19/PICK
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 1, 2019
CITY OF RICHMOND HILL
23 HEARTHSIDE AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on, (23 Hearthside Avenue), in the City of Richmond Hill,
Don River Watershed.
CFN: 61859 - Application #: 0693/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 6, 2019
41 COUNTRY HEIGHTS DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 34, Concession 2, (41 Country Heights Drive), in the
City of Richmond Hill, Rouge River Watershed.
CFN: 61916 - Application #: 0808/19/RH
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 9, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
25 CANEROUTH DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 28, Plan M-
1198, (25 Canerouth Drive), in the City of Toronto (Etobicoke York Community Council Area),
Etobicoke Creek Watershed.
CFN: 61949 - Application #: 0825/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 21, 2019
32 MONTERREY DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 406, Plan 5475, (32 Monterrey Drive), in
the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.
CFN: 61870 - Application #: 0723/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 18, 2019
92 WEST DEANE PARK DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 146, Plan 5719, (92 West Deane Park
Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek
Watershed.
CFN: 61837 - Application #: 0720/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 17, 2019
2257 ISLINGTON AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 11, Plan
9554, (2557 Islington Avenue), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 62084 - Application #: 0858/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 22, 2019
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
NORTHVIEW APARTMENT REIT
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 33, 34, Plan 1981, (1 Rosemount Drive), in the City
of Toronto (North York Community Council Area), Don River Watershed as located on the
property owned by Northview Apartment REIT.
CFN: 61858 - Application #: 0694/191TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 29, 2019
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
3 ROOKSNEST TRAIL
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 1643, Plan
M-1577, (3 Rooksnest Trail), in the City of Toronto (Scarborough Community Council Area),
Highland Creek Watershed.
CFN: 61779 - Application #: 0667/19/TOR
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 18, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
DOUGLAS REID REALTY INC.
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) and change the use, size, or number of dwelling units of a structure, or
undertake work that does not change the footprint of the existing structure on Lot 28, Plan M-
605, (27 Glencrest Boulevard), in the City of Toronto (Toronto and East York Community
Council Area), Don River Watershed as located on the property owned by Douglas Reid Realty
Inc.
CFN: 61955 - Application #: 0828/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 22, 2019
202 ROXBOROUGH DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Lot 98, 99 E.F., Plan 344-E, (202
Roxborough Drive), in the City of Toronto (Toronto and East York Community Council Area),
Don River Watershed.
CFN: 61864 - Application #: 0714/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 17, 2019
WOODGREEN COMMUNITY SERVICES
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 12, 15,
Plan D-81, (43 - 63 Pape Avenue), in the City of Toronto (Toronto and East York Community
Council Area), Don River Watershed as located on the property owned by Woodgreen
Community Services.
CFN: 61836 - Application #: 0718/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 17, 2019
CITY OF VAUGHAN
62 LARGO CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 62 Largo
Crescent, in the City of Vaughan, Don River Watershed.
CFN: 62013 - Application #: 0811/19/VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: August 14, 2019
20 PARK AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 7,
Concession 7, (20 Park Drive), in the City of Vaughan, Humber River Watershed.
CFN: 61901 - Application M 0796/191VAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: August 26, 2019
TOWN OF AJAX
43 ALDEN SQUARE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 58, Plan 40M-2224, (43 Alden Square), in the Town
of Ajax, Duffins Creek Watershed.
CFN: 61923 - Application M 0747/19/AJAX
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 1, 2019
97 ROLLO DRIVE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 166, Plan 40M-1476, (97 Rollo Drive), in the Town of
Ajax, Carruthers Creek Watershed.
CFN: 61871 - Application M 0735/191AJAX
Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 24, 2019
TOWN OF CALEDON
61 VALLEYSCAPE TRAIL
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 61 Valleyscape
Trail, in the Town of Caledon, Etobicoke Creek Watershed.
CFN: 61907 - Application M 0805/19/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: August 8, 2019
30 KEZIA CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 242, Plan
43M-1845, (30 Kezia Crescent), in the Town of Caledon, Etobicoke Creek Watershed.
CFN: 61760 - Application #: 0619/191CAL
Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca
Date: July 10, 2019
TOWNSHIP OF KING
32 JAMES STOKES COURT
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Plan 65M 4456, (32 James Stokes Court), in the Township of King, Humber River
Watershed.
CFN: 61908 - Application #: 0807/19/KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: August 12, 2019
74 SIR HENRY COURT
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 4, Plan 65M-4552, (74 Sir Henry Court), in the Township of King, Humber
River Watershed.
CFN: 61903 - Application #: 0798/191KING
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: August 14, 2019
PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for works undertaken without the benefit of a TRCA permit in a regulated area,
where such works comply with TRCA policies and procedures, are considered permits after the
fact and subject to an additional administrative fee.
CITY OF MISSISSAUGA
4278 GREYBROOK CRESCENT - Etobicoke Creek Watershed
The purpose is to complete construction of a 36 square metre deck attached to the rear of an
existing dwelling within TRCA's Regulated Area of the Etobicoke Creek Watershed. The
described works were initiated without the issuance of a TRCA or municipal building permit. As
such, an additional permit application fee of 100% was charged for this "after -the -fact" permit.
The subject property is located at 4278 Greybrook Crescent, in the City of Mississauga.
CFN: 60991 - Application #: 0547/19/MISS
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: August 22, 2019
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
DIXIL PROPERTIES INC. - Humber River Watershed
The purpose is to legalize an existing dormer on the southeast portion of the one and half storey
building at 1982 Islington Avenue in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 62065 - Application #: 0843/191TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 21, 2019
9 ASHLEY PARK ROAD - Humber River Watershed
The purpose is to construct a replacement pool, associated hard and soft-scaping including
minor grading, a replacement patio, armourstone landscape walls, and a privacy arbour in the
rear yard of the existing dwelling at 9 Ashley Park Road in the City of Toronto (Etobicoke York
Community Council Area). The proposal also includes restoration of the existing slope. A portion
of the works were constructed without the benefit of any TRCA or Municipal permits. As such,
the applicant has paid double the application fee as required for a permit "after -the -fact' in
association with the violation of Ontario Regulation 166/06.
CFN: 60162 - Application #: 0728/181TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: August 12, 2019
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
105 HUDSON DRIVE - Don River Watershed
The purpose is to legalize the construction of the wooden deck to the rear of the existing single
detached dwelling at 105 Hudson Drive in the City of Toronto (Toronto and East York
Community Council Area).
CFN: 57723 - Application #: 0431/17/TOR
Report Prepared by: Vanessa Aubrey, extension 5662, email vanessa.aubrey@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 15, 2019
CITY OF VAUGHAN
42 RIVERSIDE BOULEVARD - Don River Watershed
The purpose is to recognize the construction of a 284 sq. m. (3065 sq. ft.) interlock patio, 114
sq. m. (1227 sq. ft.) replacement deck, and partial replacement of an existing retaining wall
within TRCA's Regulated Area of the Don River Watershed. The subject works were
constructed without TRCA approvals. The subject property is located on lands known
municipally as 42 Riverside Boulevard, in the City of Vaughan.
CFN: 61820 - Application M 0697/19NAUG
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: July 10, 2019
NEW BUSINESS
Jennifer Innis provided an update to the Board Members on correspondence with a Minister of
Environment, Conservation and Parks regarding conservation authority core mandate and
associated funding allocation.
ADJOURNMENT
ON MOTION from Ronald Chopowick, the meeting was adjourned at 10:19 a.m. on Friday,
September 6, 2019.
Jennifer Innis
John MacKenzie
Chair Secretary -Treasurer