Loading...
HomeMy WebLinkAbout08-19_Minutes_Executive_Committee_2019-10-04Toronto and Region Conservation Authority Executive Committee Meeting #8119 was held at TRCA Head Office, on Friday, October 4, 2019. The Chair Jennifer Innis, called the meeting to order at 9:32 a.m. PRESENT Jennifer Innis Chair Jack Heath Vice -Chair Paul Ainslie Member Ronald Chopowick Member Dipika Damerla (in: 9:47 a.m.) Member Joanne Dies Member Jennifer Drake (via teleconference) Member Gordon Highet Member Linda Jackson Member Cynthia Lai Member Anthony Perruzza (in: 9:44 - 9:57 a.m.; 10:12.a.m.) Member ABSENT Paula Fletcher Member The Chair recited the Acknowledgement of Indigenous Territory. RES.#B102/19 - MINUTES Moved by: Paul Ainslie Seconded by: Ronald Chopowick THAT the Minutes of Meeting #7/19, held on September 6, 2019 be approved. CARRIED Section I — Items for Board of Directors Action RES.#6103/19 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020 Flood Plain and Conservation Component, Rouge River Watershed Geranium Homes (CFN 56129). Acquisition of property located on the west side of Ninth Line and north of Bloomington Road, municipally known as 13876 Ninth Line, in the Town of Whichurch-Stouffville, Regional Municipality of York, under the "Greenlands Acquisition Project for 2016-2020," Flood Plain and Conservation Component, Rouge River watershed. Moved by: Linda Jackson Seconded by: Gord Highet THE EXECUTIVE COMMITTEE RECOMMENDS THAT 4.28 hectares (10.56 acres), more or less, of vacant land, located on the west side of Ninth Line and north of Bloomington Road, municipally known as 13876 Ninth Line, said land being Part of Lot 11, Concession 8, designated as Blocks 16,17 and 18 on Registered Plan 65M-4522, in the Town of Whichurch-Stouffvilie, Regional Municipality of York, be purchased from Geranium Homes; THAT the purchase price be $2.00; THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements; THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest possible date and all reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid by TRCA; AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction, including obtaining any necessary approvals and the signing and execution of documents. CARRIED BACKGROUND Resolution #A161/15 at Authority Meeting #8/15, held on September 25, 2015, approved the Greenlands Acquisition Project for 2016-2020. Negotiations have been conducted with Michael Harte, Project Manager, Land Development at Geranium. Access to the subject lands will be achieved through its frontage from Kingstree Court and Castle Gate. Attachment 1 is a sketch illustrating the location of the subject lands. Attachment 2 is an orthophoto illustrating the location of the subject lands. RATIONALE The subject lands fall within TRCA's approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2016-2020. Through the review of the Plan of Subdivision 19T(W)-14.001 for residential development, TRCA staff established the limits of the open space lands. Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan: Strategy 3 — Rethink greenspace to maximize its value Strategy 4 — Create complete communities that integrate nature and the built environment TAXES AND MAINTENANCE This parcel of land will be turned over to the Town of Whichurch-Stouffville under the terms of the existing management agreement. FINANCIAL DETAILS Funds for the costs related to this purchase are available in TRCA's land acquisition capital account. Report prepared by: Edlyn Wong, extension 5711 Emails: ewong(aitrca.ca For Information contact: Edlyn Wong, extension 5711, Mike Ferning, extension 5223 Emails: ewong(a)trca.ca, mfenning(a)trca.ca Date: September 9, 2019 Attachments: 2 Attachment 1: Site Plan Attachment 2: Orthophoto Attachment 1: Site Plan Subject Property "Subject Property _ to0viye m 1 Legend �� Toronto and Region 0D.URH.AM. ® Conservation Authority L J � P N ® r,udu in cern Z. UI uUPI u4o s D Y aY; 4 �F r W Subject �rG _ Z (A) r z z ISN m ON R� Toronto and Region Conservation Authority k, �. RES.#B104/19 - REQUEST FOR TENDER FOR THE SUPPLY AND DELIVERY OF 5-7 TONNE STACKABLE ARMOURSTONE MATERIAL FOR PHASE II OF THE BLUFFER'S PARK SOUTH HEADLAND AND BEACH MAJOR MAINTENANCE PROJECT Award of Request for Tender (RFT) No. 10021898 for the supply and delivery of 12,500 tonnes of 5-7 tonne stackable armourstone material. Moved by: Linda Jackson Seconded by: Gord Highet WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in Phase II of the Bluffer's Park South Headland and Beach Major Maintenance Project that requires 12,500 tonnes of 5-7 tonne armourstone material; AND WHEREAS TRCA solicited tenders through a publicly advertised process; THEREFORE, THE EXECUTIVE COMMITTEE RECOMMENDS THAT Request for Tender (RFT) No. 10021898 for 12,500 tonnes of 5-7 tonne armourstone be awarded to CDR Young Aggregates Inc. at a total cost not to exceed $999,875, plus applicable taxes, plus a contingency of 10% to be expended as authorized by TRCA staff; AND FURTHER THAT authorized TRCA officials be directed to take whatever action may be required to implement the contract, including the obtaining of necessary approvals and the signing and execution of any documents. CARRIED BACKGROUND TRCA is undertaking major maintenance works on existing shoreline protection structures within Bluffer's Park on the Lake Ontario waterfront. Bluffer's Park was built in the 1970s and opened to the public as a waterfront park in 1981. Erosion control structures along the shoreline of the park include a series of headlands, beaches, and revetments which provide protection to various public amenities such as a shoreline trail network, picnic and barbeque areas, washroom facilities, marinas, and a large public sand beach. These structures have been monitored annually by TRCA's Erosion Risk Management Program (ERMP) since 2006. The project area includes an armourstone headland and sand/rip rap beach located near the southwest limits of the park. The ERMP has identified the headland as a failing structure since 2015. The beach has been listed as failing and recommended for maintenance since 2010. The armourstone material requested to be procured in this report will be used to repair the failing headland. In April 2018, TRCA was notified of significant damage to the headland and adjacent beach following a severe ice storm event which caused high wave conditions and damage to many areas along the shoreline. The waves caused significant displacement of armourstones and rip rap material, resulting in the complete collapse of the central portion of the headland. The structures were re -inspected under the ERMP, and both the headland and beach were identified as failed structures with the headland being recommended as the top priority for major maintenance. Following this re -inspection, TRCA retained Riggs Engineering Ltd. (Riggs) through a competitive process to develop detailed designs for the repair of the headland and beach. The Project is being undertaken in three phases: • Phase I: Interim maintenance of the collapsed portion of the headland — Implementation commenced in the fall of 2018 and was completed in January 2019. • Phase It: Long-term maintenance of the headland — Implementation commenced in June 2019 and is anticipated to be completed in April 2020 • Phase III: Long-term maintenance of the beach — Scheduled for 2020 to 2021, pending receipt of funding. Riggs has developed detailed designs for long-term maintenance of the headland, considering existing coastal conditions and predicted future conditions, to address the main concerns of wave overtopping and armourstone slope instability. Long-term maintenance involves increasing the crest elevation height and the partial reconstruction of the headland by filling material voids in the existing structure and then capping with a supplemental layer of 5-7 tonne armourstone. Riggs and TRCA estimated that approximately 14,000 tonnes of 5-7 tonne armourstone will be required to complete this work. The contract to supply 14,000 tonnes of armourstone (RFT No. 10021243) was awarded to Atlantis Marine Construction based on the motion at Board of Directors (BOD) Meeting #6/19 held on June 21, 2019. CDR Young Aggregates Inc. submitted the low bid on this contract but was disqualified for not including a bid bond in their submission. Atlantis Marine's contract was terminated as an unacceptable amount of armourstone they have supplied has not met TRCA required material quality standards as confirmed by an on-site professional engineer. Further, they have not been able to maintain the required rate of delivery stipulated in the contract. A new tender (RFT No. 10021898) was issued to cover the remaining 12,500 tonnes of armourstone required to complete work on the headland as per the design. RATIONALE A RFT for general contractors for the supply and delivery of 5-7 tonne armourstone material required for maintenance of the south headland was publicly advertised on the public procurement website www.biddingo.com on August 16, 2019. The RFT closed on August 27, 2019. No addendums were issued as no questions were received. Submissions were received from the following Proponent(s): • CDR Young Aggregates Inc The Procurement Opening Committee opened the Tenders on August 27, 2019 at 11:00am with the following results: RFT No. 10021898 - Supply and Delivery of 12,500 Tonnes of 5-7 Tonne Armourstone Proponent Fee (Plus HST) CDR Young Aggregates Inc. $999,875 Staff reviewed the bid received from CDR Young Aggregates Inc. against the results of the previous tender and has determined that the bid is of reasonable value and meets the requirements as outlined in the RFT documents. Therefore, it is recommended that contract No. 10021898 be awarded to CDR Young Aggregates Inc. at a total cost not to exceed $999,875, plus 10% contingency, plus applicable taxes, it being the lowest bid meeting TRCA's specifications. Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic Plan: Strategy 2 — Manage our regional water resources for current and future generations Strategy 7 — Build partnerships and new business models FINANCIAL DETAILS Funds for the contract will be recovered from Parks, Forestry and Recreation through the City of Toronto Master Service Agreement dated August 15, 2018. Expenses are being tracked through account code 186-44. Report prepared by: Jet Taylor, extension 5526 Emails: jet.taylor(a�trca.ca For Information contact: Jet Taylor, extension 5526 Emails: jet.taylor(a trca.ca Date: September 9, 2019 Attachments: 1 Attachment 1: Bluffer's Park South Headland and Beach Major Maintenance Project — Project Area 1.— A 12 ol ` m 2 `m 9 .Q aid' a m ------------------------- Q, Section II — Items for Executive Action RES.#6705/19 - REQUEST FOR TENDER FOR UNIT PAVING AND CONCRETE WORKS AT DON MILLS ACCESS TRAIL Award of Request for Tender (RFT) No. 10021850 for a contractor to supply labour, equipment and materials necessary to install unit paving, concrete foundations and a concrete sign for the Don Mills Access Trail in the City of Toronto. Moved by: Linda Jackson Seconded by: Cynthia Lai WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a project that requires the supply and installation of precast unit paving and concrete structures; AND WHEREAS TRCA has partnered with the City of Toronto to implement this project; AND WHEREAS TRCA solicited tenders through a publicly advertised process; THEREFORE, LET IT BE RESOLVED THAT Request for Tender (RFT) No. 10021850 for Don Mills Access Trail — Unit Paving and Concrete Works be awarded to CSL Group Ltd. at a total cost not to exceed $257,180.00, plus applicable taxes, to be expended as authorized by Toronto and Region Conservation Authority (TRCA) staff; THAT TRCA staff be authorized to approve additional expenditures to a maximum of $25,718.00 (approximately 10% of the project cost), plus applicable taxes, in excess of the contract cost as a contingency allowance if deemed necessary; THAT should TRCA staff be unable to negotiate a contract with the above-mentioned proponent, staff be authorized to enter into and conclude contract negotiations with other Proponents that submitted quotations, beginning with the next lowest bid meeting TRCA specifications; AND FURTHER THAT authorized TRCA officials be directed to take whatever action may be required to implement the contract, including the obtaining of necessary approvals and the signing and execution of any documents. CARRIED BACKGROUND The objective of the proposed Don Mills Access Trail project is to provide the Flemingdon Park and Thorncliffe Park communities within the City of Toronto with a formalized access trail connected to the Lower Don Trail system through upgrading and improving an existing, well used informal path. An approximately 300 m asphalt trail will be implemented along the location of the existing informal trail with seating areas and custom art work. The project will greatly improve public safety, trail user experience and help protect the ravine and valley system. The key objectives are to improve accessibility to the Lower Don Trail network for persons with disabilities, improve the aesthetics of the property, and to create a formal cycling route into the ravine and valley system. RATIONALE A Request for Pre -Qualification (RFPQ) for general contractors was publicly advertised on the public procurement website www.biddingo.com on August 13, 2019 and closed on August 21, 2019. General contractors interested in pre -qualifying were advised that in order to receive a tender package they would be evaluated on a pass/fail basis in consideration of the following criteria; • Completeness of submission • Previous experience with precast concrete unit paving, cast in place concrete, precast concrete, custom concrete forming, creating and reviewing shop drawings and creating custom signs • Value of completed works and experience dealing with construction budgets of $200,000.00 to $300,000.00 • Ability to meet construction schedule milestones • Ability to coordinate work, scheduling and construction management • Adherence to Health and Safety policies and requirements • Resumes of key personnel • Feedback received from references provided by the contractor on their CCDC 11 — 2016 Form as well as internal TRCA references, where applicable. A total of eighteen (18) firms downloaded the documents and three (3) pre -qualification submissions were received from the following Proponent(s): CSL Group Ltd. Dufferin Construction Company Forest Ridge Landscaping Inc. An Evaluation Committee comprised of staff from Resource Management Projects reviewed the pre -qualification documents based on the criteria above. Based on the evaluation results, Request for Tender documents were issued on August 26, 2010 to the following two (2) Proponent(s): • CSL Group Ltd. • Dufferin Construction Company A mandatory meeting and site tour was held on August 29, 2019. The RFT closed on September 13, 2019. Three (3) addendums were issued to respond to questions received. The Procurement Opening Committee opened the Tenders on September 13, 2019 at 12:15 PM with the following results: Proponent Fee (Plus HST) CSL Group Ltd. $257,180.00 Dufferin Construction Company $429,046.00 Staff reviewed the bid received from CSL Group Ltd. against its own cost estimate and has determined that the bid is of reasonable value and meets the requirements as outlined in the RFT documents. Therefore, it is recommended that contract No. 10021850 be awarded to CSL Group Ltd. at a total cost not to exceed $257,180.00, plus 10% contingency, plus applicable taxes, it being the lowest bid meeting TRCA's specifications. Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic Plan: Strategy 3 — Rethink greenspace to maximize its value Strategy 4 — Create complete communities that integrate nature and the built environment Strategy 7 — Build partnerships and new business models FINANCIAL DETAILS Funds for this contract will be provided by the City of Toronto through both Federal Transit Infrastructure Funds, and also City of Toronto Cycling Infrastructure Funds. The costs of executing this contract, including all staff time and associated costs to manage the project, is being tracked under account 117-29, and are recoverable though a Letter or agreement with the City of Toronto. Report prepared by: Corinna Thomassen-Darby, extension 5625 Emails: corinna.thomassen-darby(c trca.ca For Information contact: Marnie Shepley, extension 5314 Emails: marnie.shepley(cDtrca.ca Date: September 13, 2019 Attachments: 1 Attachment 1: Key Map of Don Mills Access Trail IiAuacnrneni I. ne IVIa OT UOn IVIIIIS HCCe55 i rau O � j Proposed Project Limits" I DVP ,_f'ARKVIEL> HILL CR_ES - I Legend �� Toronto and Region Conservation DURHAM YORK Authority PEEL N TORONTO SITE �.xe onreno Section III — Items for the Information of the Board RES.#6106/19 - 2019 SIX MONTH FINANCIAL REPORT Receipt of Toronto and Region Conservation Authority's (TRCA) unaudited revenue and expenditures as of the end of the second quarter, June 30th, 2019 for informational purposes. Moved by: Jack Heath Seconded by: Gord Highet IT IS RECOMMENDED THAT the 2019 Six Month Financial Report ending June 30, be received. CARRIED BACKGROUND As part of TRCA's financial governance procedures, staff are presenting the 2019 Six Month Financial Report, which covers the period January 1, 2019 through to June 30, 2019. This report provides information on the spend rate of expenditures for the first six months of 2019. RATIONALE TRCA believes in transparency and accountability for its spending, revenue recognition and performance of service delivery objectives against approved budgets, for both the organization and for each project and program as an individual endeavor. This is further supported by TRCA's core values of integrity, collaboration, accountability, respect and excellence. TRCA recognizes that all projects and programs offered have cost implications and that all costs incurred are reasonable and practical in support of services. Transparency throughout the budget management process is achieved in part through the analysis and reporting on year to date revenues/expenses as compared to the current fiscal year budget. In order to improve the accuracy in reporting anticipated issues in expenditures, TRCA established a seasonal forecasting baseline using historical data from the past three years to estimate the seasonal variances within each program area. Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan: Strategy 9 — Measure performance FINANCIAL DETAILS The operating and capital report by Service Area and underlying Program Areas are provided in Attachments 1, 2 and 3 respectively. The attachments provide a summary analysis of expenditures and revenues to date and the variance explanations by Program Area which have a variance threshold of +/- 10% and $500,000 from anticipated quarterly spend rates. Variances within these thresholds are deemed to be within the expected range. The operating report shows no reportable variance for the six-month period, whereas the capital report contains six Program Areas that have reportable variances. Attachment 3 provides explanations for these variances. Report prepared by: Jenifer Moravek, extension 5659 Emails: Jenifer.Moravek(cDtrca.ca For Information contact: Michael Tolensky, extension 5965 Emails: Michael.TolenskvCcDtrca.ca Date: October 4, 2019 Attachments: 3 Attachment 1— Six Month Variance Report — Operating Budget Attachment 2 - Six Month Variance Report— Capital Budget Attachment 3 - Six Month Variance Report — Reportable Variance Notes ATTACHMENT 3 -SIX MONTH VARIANCE REPORT- OPERATING BUDGET Watershed Planning and Resorting Watershed Plans and Strategies Report Cards Climate Science Emerging and Integrative ❑imate Science Water Resource Science Groundwater Strategies Spume Water Protection Strategy Regional Monitoring - Water Hydrology Stormwater Management Strategies Flood Plain Mapping Indian Management Capital Warks Hazard Monitoring Flood Management Flood Forecasting and Warning Flood Risk Management Flood Infrastructure and Operations Biodiversity Monitoring Regional Monitoring - Biodiversity Activity Based Monitoring TerresMal Inventory and Assessment Waterfront Monitoring Ecosystem Management Research and Directions Aquatic System Priority Planning Terrestrial (and Integrated( Ecosystem Management Natural Channel Design Restoration Opportunities Bank Forest Management Managed Forest Tax Incentive Planning Hazard Tree Management Invasive Species Management Forest Management Planning Forest Management Operations R6toration and Regeneration Propagation and Sale of Plants Inland and Whefill Soil Management Shoreline Restoration Wetlands Riparian and Flood Plain Restaration Natural Channel and Stream Restoration Terrestral Planting Wildlife Habitat Management Compensation Restoration Watershed Restoration Greenspace Securement Greenspace land AcqusWon Greenspace Planning Greenspace Management Archaeology Property Taxes and Insurance Resource Management Planning Inventory and Audit $ Spend %Spend Reportable 2019 Budge:201901-201906 Anticipated 1Spend (%) Anticipated Q2 Spend ($) 2019 Actual: 201901-201906 Oifhrence Difference Variance Authority Govemmen Authority Govemmen Expenditures Generated tFunded Levies Reserves Not Expenditures Generated tFunded Levies Reserves Ne 1,581,000 24,000 100,000 1,457,000 - - 48% O% 758,880 )50,860 806,184 800,104 - 20,000 20,000 1,456,900 1,456,900 - 6)0,)16 6)0,)16 $ 47,304 $ 6% 0% 1,581,000 24,000 100,000 1,457,OD0 - - - 860,790 - 860,)00 - - - 860,600 - 80,600 - - - 860,700 - 860,1110 0% - 38,915 - - - 860,600 - 8601600 $ - 0% 828,700 45,E 181,SDo - (602,200) 280,200 1,481 - 18,890 (259,430) 3581500 100,000 - 12585001 161,325 176,314 - (176,314) 1,187,200 45,000 281,500 - - (86,)00) 45% 534,240 111 2,481 - - 18,890 (436,143) $ 1%2,)2)) 45% 26,900 26,900 - 27,000 27,000 21,800 - 22,800 - - 8,066 22,433 - 35,778 - - 13,345 7,500 - - - - (7.500) 2,775 280 - - - - (288) 29,300 22,9W 26,900 - 19,400 37% W,841 13,500 22,81 35,)78 27,000 40,057 $ 11,890 110% 0% 25,01 - - - (25,000) 22,426 - - - (22,426) 54,01 (54,000) 54% 29,100 4itesh 21,106 (21,106( $ 87Z 2% 79,000 - - - - (79,04Do) 13,532 - - (43,532) 30,000 10,000 - - 3,700 (34,937( 12,642 - - - 47,579 287,100 500,500 - - (100,000) 123,400 106,227 112,576 453,010 - - - 340,434 24,000 - 24,000 - 8,880 8,915 - 7,363 - - (1,553) 80,000 - 801000 - - - 29,600 208,431 - - - (208,431) 26,400 - 26,400 - - - 9,768 10,063 - - - - (10,063) 97,700 97,700 374 0% 36,149 194,324 - 222,650 -r124,892 79,199 54,704 (24A95) $ 189,923 $ - 98% 0% 525;200 510,500 778,1W (100,000) - 123,400 384,7,47 41 62,068 143,472 - - 1,095,200 - 1,095,200 - - - 3,095,300 - 1,005,300 1,095,300 1,095,300 1,095,200 1,095,200 365,000 1801 185,000 - - 8,595 8,185 - - (18),9)61 343,01 5,o00 - - - (3381000) 209,230 28 - - - (2. ,616) 21,400 - - - (21,400) 13,054 - - (1,633) 146,800 - - - - 1146,8001 89,548 - - - (17,4,8921 ATTACHMENT 3 -SIX MONTH VARIANCE REPORT- OPERATING BUDGET Implementation Hazard Management RenmlProperties Rentals Waterfrom Parks General Maintenance Park Planning Arsenal lands Park Development Conservation Parks Day use Picnics Swimming Fishing Mountain Biking Camping Cross Country Skiing Filming Park Development Tells Trail Development Trail Management Trail Planning TRCA Trail Strategy Bathurst Glen Golf Course Golf Course Black Creek Pioneer Village Heritage Village Events and Fertivals Kortright Black Creek Pioneer Village Other Facilities Wedding and Corporate Events Kortnght Black Creek Pioneer Village Other Facilities Developmemplanning and Regulation Permitting Planning Permitting Enquires Technical Semces Development Enforcement and Compliance EnWranmental Assessment Planning and Permlt8ng Planning (Basic, Servicing Agreements, Master Plans( Permitting Development Enforcement and Compliance Technical Services Policy Development and Review Poli, School Programs $Spend %Spend Reportable 2019 Budget 201901-201906 AnUciFHetl O2Spend 1%) Anticipated Q2 Spend ($) 2019 Actual: 201901-201906 Difference Difference Variance Authority Govemmen Authority Governmen Expenditures Generated t Funded Levies Reserves Net Expenditures Generated t Funded Levies Reserves Nat 5,000 - - - - (50,008) 61% 30,500 561,982 1,628 - - - - (1,628) $ 28,572 5% 92,200 185;000 185p00 - - (556,200) 593,554 8,623 8,185 + - (526,745) 1,970,600 3,483,6W 136,500 116511500 51% 0% 1,005,006 1'005,006 - 1,168,272 1,216,099 151,138 199,965 $ 163,266 $ - 16% o% 1,970,600 3,493,600 138$00 1,651,500 1,168,28 1,216099 151,138 198,965 - - - - - - - - - - - - 2,216,800 514,800 - 1,506,500 - (195,5001 ]]5,880 1,053,622 145,]0] - 1,506,300 - 590,465 1,315,650 2,069,700 - - 754,050 460,476 338,661 917,091 - - 57BA10 4]],500 518,500 - - - 41,000 167,125 113,555 41,284 - - - (72,272) 15,000 891000 - - - 74,000 5,250 (1,437( 53,535 - - - 54,972 1,453,000 3,331,400 - - - 878,400 508,550 580,642 1,516,151 - - - 935,504 42,000 112,000 - - - 75,000 14,700 32,020 101,659 - - - 68,831 35% 1,931,983 512,460 3,620 (3,620) $ 189,535 $ 2" 10% 0% 5,519,950 5,640,400 115061500 1,626,950 2,121,517 2,725,507 1,506,300 2,160,290 - _ - - 2" 12" 1,314,000 1,135,000 168,.000 9,000 465,550 448,694 (16,856) 1,314,000 1,135,000 188,000 - - 9,000 39% 512,460 1;694,180 465,550 448,690 - - - (1611156) $ (461910) -9% 4,235,450 1,952,000 230,000 - - (2,053,"0) 2,632,241 636,]]9 - - - (995,463) 4,235,450 1,952,000 2301000 (2,053,450) d0% 1,694,]30 142,830 1,63;2,41 6361729 (995,463) $ (61,939) 4% 202,000 396,400 - - - 189,400 150,305 318,321 - - - 168,016 246,900 321,000 - 74,100 170,361 96,293 72,395 2,000 (21,398) 193,000 347,000 - - - 154,000 133,170 153,772 283,386 - - - 129,615 646,900 1,064,400 417,500 69% 446,361 400,370 674,102 2,000 2]5,]32 $ (45,9911 -10% - - - - - 0 - - - - (o) - (20) 20 0% 1,202,803 W - - -20 $ (20) 0% 2,454,200 4,595,000 50,1100 - - 2,190,300 1,019,365 1,573,222 - - - 553,852 1,]a0,]00 2,425,000 - - 644,300 672,543 ]33,]63 838,761 - 104,998 45,000 314,000 - - - 269,000 22,050 5,028 23,413 - - - 68,334 1,7%100 - - - - 12,760,2001 862,449 928,257 - - - - 1928,2521 502,800 (502,800) 49% 246,372 3,206,21] 596,159 243,572 (243,572) 5 12]6,181) -9% 6,543,300 7,334,0 501000 Bell 2,930,036 2,485,396 (444,640) 1,216,650 98,o00 582,900 196,000 - Sall 462,888 325,242 108,933 196,000 217,288 1,104,650 1,126,000 329,900 196,000 - 542,250 541,279 456,616 398,388 95,007 196,000 - 233,180 335,200 - (335,200) 164,248 152,417 - 1152,41]) 1,325,000 442,200 (882,800) 49% 649,250 1,950,935 434,909 51954 155,513 (273,443) $ (444,1051 -23% 3,981,500 2,106,000 1,360,000 392,000 - (123,500( 1,500,830 7",584 359,853 392,000 - 24,608 346,000000 1346,0001 48% 156,000 IN, OB0 123,]]6 1123,226) $ (42,304) -25% 34, (346,000) 223,726 (123,276) ATTACHMENT 3 -SIX MONTH VARIANCE REPORT- OPERATING BUDGET Early Leamers Postsecondary Elementary Secondary Newcomer Sernices Development of Internationally Trained Professionals Multicultural Connections Program Family and Community Programs Kortright Bolton Camp Development Other ocations Lying City Transition Program Sustainable Neighbourhood Community Transformation Partners in Project Green Urban Agriculture Sustainable Technology Evaluation Program Climate Consortium Green Infrastructure Ontario Community Engagement Citizen Based Regeneration Stewardship Watershed Engagement Social Enterprise Development Social Enterprise Financial Managemem Accounting and Reporting Business Planning and Strategic Management Corporate Management and Governance Corporate Secretariat Corporate Sustainability Management Support Services Risk Management Office of the CEO Human Resources Volunteers Employee Support Health and Safety Human Capital Planning and Strategies Corporate Communications Communications Digital and Social Media Information Infrastructure and Management Information Technology Knowledge and Data Management Business Software Project Recoveries Project Recoveries Vehicles and Equipment Operations Acquisitions Anticipated Anticipated $ Spend %Spend Reportable 2019 Budget. 201901-201906 WSpend 1%) Q2 Spend ($) 2019 Actual: 201901-201906 Difference Difference Variance Authority Govemmen Authority Govemmen Expenditures Genemted tFunded Levies Reserves Net ExpendRures Generated tFunded Levies Reserves Net ]20,]90 180,400 - - - 1540,3907 338,771 279,363 93,540 - - - (181 64,500 62,600 - - - 11,9001 30,315 49,698 5,277 - - (Mp21) 4,570,840 3,415,406 7,000 2,231,030 1,082,590 2,148,295 1,]]],]94 1,4]3,56] - 2,230,700 - 1,91 - 103,200 - - - 103,200 - - 39,910 - - - 39,919 5,356,130 3,761,600 7,000 2,231,030 603,500 471% 2$1],381 2,106,855 1,612,293 2,230,700 - 1,736,138 IS (410,5261 -16% 730,10 25,945 654,155 - - 150,000) 50% 365,050 365,050 3313,660 5,775 179,086 - - 1153,]99) $ (26,390) -796 730,100 25,945 654,155 - - (50,000) 330,660 5,]]5 179,006 - (153,799) 899,500 284,100 - - - (615,IW) 368,795 355,490 113,981 - - - 1241,510) 111,300 111,500 1,700 20,000 21,906 41% 45,633 414,428 158,107 103088 (55,010) $ 99,169 24% 1,010,000 395,600 1,706 - 20,000 (593,506) 513,597 217,069 - - 1296,520) - - - 12],]00 - 122,706 - - - - 127,600 - 127,606 146,306 - - - - (MISS 061 70,224 34,901 - - - - (3,901) 146,300 12],]00 (18160➢) 4015 70,224 6,700 34,903 127,00 92,699 S (35,323) 30% 13,406 - - - - (13,406) 514 - - - - (5141 279,200 311,2W - - - 32,060 139,600 137,659 111,593 - - - (26,066) 292,600 311,200 181601) W% 0% Mini, 1,OD,180 138,173 111,593 (26,5801 $ (Si 5 - E% o% - - - - - - - - - - 2,233,000 711,000 80,060 7,523,050 6,481,050 1,085,422 451,135 - 7,521,963 6,00],6]6 785,800 - - - - (785,800) 361,460 382,441 - - - - (382,441) 3,018,800 711,000 801000 7,523,050 5,295,250 46% 1,383,618 767,70 1,467,863 451,235 7,521,963 6,505,235 IS 79,215 6% 1,371,000 - - - - (1,371,060) 1,153,565 92 - - - (1,153,473) - 1,]]3 - (1,7731 4,113,000 116'00 225,006 - - (3,"2,000) 2,303,280 2,155,589 73,681 - - - (2,081,908( 346,0000 (346,00(g) 193,760 161,973 1161,9]3) 5030,000 116,000 225,000 _ - - (51439,000) 56% 49141 3,264,000 642,635 642,635 8]],000 3,472,901 ]3,"3 - - - (3,391 $ 200,101 $ (90,861) 6% -14% 1,311,506 - - - (1,313,506) 551,]]4 416,330 - - - (135,404) 1,311,500 (1,311,500) 551,"4 416,330 (135,444) 1,754,000 - - - - (1,754,060) ]]6,232 - - - - (776,232) 57,000 (57,00(g) 28,500 59,713 159,7131 11311,000 _ (1,831,000) 50% 905,506 594,500 8351944 (035,944) $ (69,556) 41% 1,450,000 - - - - tl,"O W) 60],16] - - - - (607,167) 1,157,606 - - - - (1,19,6061 474,616 411,862 3,826 - - - "8 036) - 160333 53 (10,280) 2,60],606 - _ - - - (2,607,6061 91% 1,069,116 1,59,K 20) 1,1]9,362 3,879 - - - (1,1]5]103) $ 110,296 10% (5,498,0001 - - - - 5,498,060 (1,151,]98) - - - - 1,151,798 (5,498,000) 5,498,000 29% (1,594,020) (506,100) (3,151,]98( 1,151,798 $ 442,622 0% (1,205,000( - - - - 1,205'06 (38],4961 - - - - 337,496 1,105,000 - (1,105,000) 464,106 248,521 - - (7,4ill ATTACHMENT 3 -SIX MONTH VARIANCE REPORE- OPERATING BUDGET Grand Total $Spend %Spend Reportable 2019 Budget 201901 - 201906 Anticipated Od Spend 1%) Antinpated Q2 Spend J$) 2019 ARual, 201901-201906 Difference Difference Variance Authority Govemmen Authority Governmen Upenditures Generated tFunded Levies Reserves Net 42% 98% MOOO) 21,793,166 Expenditures Generated tFunded Levies Reserves Net $ )%.975) $ 111,659 0% 1% )100,000) 100.000 )139,975) 138,975 05,002,630 28,801,295 3,750,755 15,220,180 )80,000 2,28$750 aIKI} 1;383,763 818,108 15418,263 18,890 6AM,198 ATTACHMEM 2 -SIX MONTH VARIANCE REPORT -CAPITAL ROWS] Watershed Planning and Reporting Watershed Plans and Strategies Report Cards Climate Selena Emerging and Integrative Climate Science WNer Resource Selma Groundwater Stralegies. Snorts Water Protection Smile, Regional Monitoring -Water Hydrology SI.-IVr Management Strategies Flood Plain Mapping Erosion Management Capital Works Haan Monitoring Flood Management Flood Risk Management Flood Infrastructure and Operations BlodWesSlty Monlioring Regional Monitoring Blodiversiry Artivity Based Monitoring Terrestrial Inventory and Assessment Wrterfrant Monitoring EmsysFem Management Research antl Oirecdons Aquatic System Priority Planning Terrestrial (and integrated) Ecosystem Management Fall Charrel 0es1gn Restoration Opportunities Bank Forest Marugement Managed Forest Tax IncenOve Planning Favid Tree Management Invasive Species Management Forest Management Planning Forest Management Operations Respontlon and Regeneration Propagation and Sale of Plants Inland and Lakeflll Sell Management Shoreline Restoration Wetlands Niparlan and Flood Plain Rantoul Natural Channel and Stream Restoration Terrestrial Plant, VAIdllfe Habitat Management Compensatlon Restoration Watershed Rertoratlon Gisposa e5ecuremenL Greenspme Land Acquskion Gaenspace Planning Gremspace Management Archaeology Resource Management Planning Inventory and Audit Implementation Haaard Management %Spe1M Reportable 2019 Budges: 201901-2019W Mtidpa4tlM Spend l%) MNtlpated 4l Spend ($) 2019 Actual: 201901-2019W $Spend Oitference OIfarenw Variance Authority Government Autborky Government Eypenditures Generated Funded Levies Reserves NET ENpendkures Generated Funded LrvRs Reserves Net 1,024,000 7,000 414,000 653,000 - SOpW SIM,160 360,781 - 179,196 661,784 480,199 243,000 243,000 34% W20 430,]80 102,360 73,051 243,366 171,315 $ 2,052 OR 1,267,000 7AW 414,000 896800 sOpW 432,832 179,195 9051150 651,514 958,000 - - 958,WO - - 3.00;439 15,000 - 959,79.4 - 6]4,356 958,000 - - 9581000 R% 40Zi60 232,190 300,439 _.. 11,000 _ - 959,]94 - 674,356 $ h01,923) 45% 749.000 7,000 742,000 - - 1,730 742,389 - ]4"119 500,750 S,WO 501,750 157,093 201,986 4,582 146,306 (5]838) 486,900 26,900 59,700 593,400 - 193,ID0 150,93901 253,632 58,819 12,187 600,945 - 462,310 130,000 - 801000 - (WARM) 40:300 (0) - - - 0 1,8`7/,000 1,657,000 220,000 - 581,8" 319,379 123,276 220,925 24,82 932,300 7,500 672501 252,300 - - 289,013 335,359 9,925 - 263,891 - (61,544) 4881,950 46,100 2,970,950 1,80],]00 1431100 31% ]8518115 23,697,812 1,110,356 ]5,05] 281,769 1,82,150 111181620 $ (341,048) -23% 81,718,593 1,332,100 63,134,593 17,252,800 - 21900 11,998,534 41512 5,804,004 '1],206,]90 - 11,42],3]3 1,740,920 228,920 1,520,000 - 507,187 401,652 2,658 11535,959 1,136,008 83,465,52 1,392,100 63,963813 18,]];800 2,900 39% 24,204899 12,100,186 415,22 5,BW,fi63 18,)42,]49 - 12,161,138 $ (11,804,813) 49% A 3,053,300 - 2,030801 970,000 - (52,900) 1,709,848 1,092,020 199,573 994,451 - 121,2w 1,222,000 21,000 437,000 SLA,000 500M 56% 68"320 2,394,1611 545,685 68,623 822,085 38,025 $ (265,662) -32% 0 4,25,3011 21,0,00 2867800 1,784,000 (12100) 1,618$06 60,623 1991573 2A GA38 - 456,22 1,285,850 2,500 219,250 050,000 - (193,100( 835,80350 442,199 57,029 53,396 852,146 520,373 55$550 224,700 66,650 267,200 - - 363,05950 274,083 162,674 48,439 318,079 - 255,100 425000 - 425,000 - - 276,250.00 266.407 - 16,500 440826 191,119 371,000 3]1,0[0 65% 241,150.00 1,716,260.00 26],]2001 142871 1]1,]31 29,20 $ (592,100) 3C% C 2880,000 248200 656800 1, zkgi (1931100) 1,124,160 219,703 290AR6 21610,252 9951863 446,200 12,010 159,2N 25;00) - - 153,057 12,250 91,703 275,645 - 232,542 4811000 50;000 wow 411,000 - - 288,600 33],8]8 191271 61,155 411,852 - 1341405 8,_000_ 4,801 22,768 0,046 935,200 62,000 _8801_ 187,100 6861000 6014 563,310.00 556800 _1_3,9_2_2_ 504,857 31,52 1631626 68],49] - 3]5,]93 $ (56,263) -10% 111600 11,600 - - 6,493 - - (6,492) 79 9,200 509,200 395,0 00 - 43 4,016.00 211,90 16,103 423,435 22,634 227,000 9,0111 80.001 130,000 - - 10R960 M,2]] 23,316 148,613 - 4"652 330,400 3,400 - 327,000 - 158,592.00 1]0,]00 3,650 - 435,597 268,547 1,473,200 Ulm 59],200 052,000 M% ]0],336.00 IBA01 516,374 14753 23,316 2800,646 534,341 $ (190,762) -27% 95,000 - - 95;000 - - (1,9") - - 95,001 - 96,9N 1,105,300 673,300 432;000 - - 442,120.00 ]50,]83 51,779 289,922 432,000 22,918 1,111,100 355,400 81,700 674,000 - - 444,44001 602,374 183,075 42,305 690,381 - 303,382 530,500 1,500 529,000 - - 22,200 3]1,12] 36,316 541,629 - 2061818 1,418,400 2658111 330000 823,400 - 56],360.[0 NN,665 253,478 327,862 1,587,360 1,704,035 3,429,700 31,200 39500 3,359,000 - - 1,371,880.00 1,473,540 24A19 23,000 3,411,043. 1,985,298 195,625 64625 135,000 - - 78,2511.00 175,299 3,175 15,625 344,92 - (11,927) 2,128,550 2,023,550 105800 - 851,420.14 280,648 1,316,032 1,035,304 6,552,500 4,604,550 1,672000 275,950 AO% 2,621,001 6,616,670 599,940 327,591 61,295 313,650 308,343 355,696 $ (2,182,615) 330; 0 16A64675 7,281,= ;962,125 6,313}50 4%AM/N5 119]8$69 1,01;731 7,200835 5,690,593 2,]2],000 1,350,000 1,2]],000 100,000 - - 114,885 255,500 127,180 200,014 367,808 - - - - - - 1,230 103,540 20,236 12,546 ;]2],000 21350,000 1,2]],000 100,000 2% 599840 129,549 116,116 354040 14]A1] 100,014 490,354 $ (483,824) 21% 417,900 99,0011 - 423,200 - lokm 294,229 - - 424.044 124815 131,300 - - (131,300) 40703 46,698 (44698) 4,370,550 - 3,600,601 769,950 - - 1,38,8]1M,763 - - 1,650,246 1$08,483 33,000 33,000 101230 20,561 - - 33,839 - 13,278 4,9]50 4, 94000 1608600 126,13 - (2000,( 31% 1,539,359 5251 03 - - 2,104129 - 5,604,08 $ (1,032,102) bra% E ATTACHMENT 2 -SIX MONTH VARIANCE REPORT -CAPITAL BUWE] Waterfront Parks General Maintenance Park Planning Arsenal Does Park Development Conservation PaM1s Day Use pim R N, Park Development THIN Trail Development Trail Management Tmil Planning TRCATrail Strategy B ick Cook Pioneer Bill Hentage Village Events and F.11va1s Nartright Black Geek Pioneer Village Development Nanning and Regulation Permitting Planning Technical Services EnWmnmental Assessment Naming and Permitting Planning gmig Servicing Agreements, Master Plans) Polity Development and Review Pollry Stated Programs Part Secondary Elementary Secondary Newcar mw Services Multicultural Connections Program Family and Community Programs mitright Bolton Camp Development Other Location IIWng Clty Transition Porgrom Sustainable Neighbourhood Community Transformation Partners In Project Green uman4riculmre Sustainable Technology Evaluation Program Climate Coramolum Green Infrastructure Ontario Community Engagement UtIzen Based Regeneration Stewmiship Watershed Engagement %Speddl Reportable 2019 Budget 201WI-201906 Anticipated qi Spend IN) AMkipadmIM Spend )$) 2019A,Tua1: 201901-201900 $Spend DiNerenre OafNe m Varian¢ Authority Government Authority Government Espenddures Generated Funded Levies Reserves No ENpendHures Generated Funded levies Reserves Net 283,500 13,500 220,000 - 124,740.00 893,789 6,975 276,00 (616,814) 1,287,600 21,E00 227,000 1,039,000 - 566,544 30,363 1,340 153,590 1,039,001 1,163,567 - - - - - - 53 - (53) 9891575 989,575 44% 435,413.00 1,126,97 51,050 (91,177) (142127) $ (151,442) -13% 2$686]5 35,100 1,216375 1j ,Xlds - - 975,255 Bj15 62,413 1,309,000 - 4dA]4 601,000 - - 601pW - 264,440 87,901 - 7,904 61],0]9 537,171 44% 264,4,01 943,40600 3,675 - - 3,675 $ (176,539) 47% W1,W0 W1,d0 8],901 12,669 81],0]9 SW,846 2,850.800 662,000 1,475,000 721,84 - 930,383 92,378 625,510 0.7,176 43,076 118,165 1961100 28,WO 40.500 - (v,ao) 6871300 174,521 38,429 150$99 - 14,507 295,800 - 65,1W 0 3$3 - 7(6,00 97,614.00 65,452 - - 377,30 311,848 33% - 1,105,731 318,320 48250 (48,250) $ 112,874 10% 3,350,700 690,00 11580,010 1,99,100 27AW1 1,218,605 130,07 7]6,11] 1,104,476 43,476 836,271 692,000 2,432,000 Y710A00 275,655 - - 2,432,749 - 2,157,093 692,400 2,432,000 ]QIOAd 46% OR 318,320 - 275,656 2,32,749 2,157,093 $ (40.E6Q S 235 -13% 0% 235 (335) 235 - - - (235) 0% - - 6,133 (6,233) $ 6,133 OR 6,03 (61133) - 262,377 - - (262,377) - OR 45% - 238,590 238590 262,377 (262,3]]) S 262,3]] $ (16,047) O% -7% 530,200 530,200 R2,503 548,150 32,4640 530,200 530,200 222,503 - 548,150 - 325,600 1,503,500 2,300 446,000 1,055,20 - 300,700 673,502 5,843 152,025 (,006,978 581,343 7,223,000 7,252,000 39,000 20% 1,444,600 1,745,34 W,D16 646,538 10,989 7,190,151 6$541602 $ (425,260) -24% 0,726,500 MRS 446,400 8307,204 281,00 1,320,040 16A31 152,025 $28],129 7,135,45 155,20 5;200 - 150,000 - - 58,307 - - 150,04 91,693 155,2110 5,3110 .150,00 58% 90,016 51,307 150,000 91,693 $ (31,709) 35% - - - - - -1,292 - 20,000 - - Oil 2501000 250,000 901000 - 38,100 9,100 - - - (29"'00) 13,716 8,892 52,458 - 43,567 288,100 359,300 (29X4) 36% 100,716 475,065 181,0 53,458 PAW 67,274 $ (93,532) 40% 1,055,700 99,500 278,24 878,000 - - 381,718 del 125,146 705,423 - 101,452 1,329,60 408,(00 721,500 - - 508,320 318,447 92,433 ]5],460 - 531,466 1,585,400 477,300 568,100 5420W - - 713,430 381,380 190,473 30,019 542,00 381,104 325,000 - - 325,000 - - 146,250 106,538 - - 325,481 210,9M 21063,000 1,002,000 253,000 813,OW - - 930,600 1,037,426 5101063 174,791 813.00 - 410,433 573,300 10.,200 241,100 100,000 - 257,985 3MA29 180,903 34,973 160,OW 32.448 38,0__000__ - 161100 9_0,0_M 227,292 - 246,891 _358_,_000 ],495,00 0 2,19], 1 _93p4 1,431,44 _22_7,00 3,466,100_ 41 3,19;750 713,497 2,69a,951 _16,250_ 2,050,128 __9_3,35_6 M0,285 3,530,677 2,330,138 $ (493,799) -]5% 1,824,350 108,150 246,000 1,470,200 - 687,091 65,80 152,552 1,511,685 - 1104;955 683,100 39,500 22,000 622,000 266,565 253,050 18,326 14,141 665,545 � 400,%1 392,100 38,030 - 354,14 - - 39% 152,919 1,130,481 54,900 33,619 - 412,005 30.0,664 $ (135,879) -12% 2899,950 T85,60 268,400 24461300 - 995,14 11],]54 166,693 2589,335 - 1,878,SW ATTACHMENT 2 -SIX MONTH VARIANCE REPORT -CAWAL BUDGET Financial Management Accounting and Reporting Business planning and Strategic Management Corporate Management and Governance Support 5ervlas Risk Management Human Reaourres Volunteers Health and Sahty Corporate Communications Communications Information lnhastrucWre and Management Knowledge and Data Management Business Software Project Resonance Pmject Rewvenes Vehicles and E,W,nesnt Operations Grand Total %SPoM Neparbble 2019 Budget. 201901-201906 Recognized! M gained IN) Auditioned 42 Speed ($) 2019Acua1: 201901-2019M $Speed ONMenre aference Vatlance Authority Government Authority Goverment EependRures Generated Funded cs", Reserves Net ENpendHures Generated Funded Levies Reserves Net 18,129 - (18,129) - - 0% - 5,272,037 18,129 1181129) $ 18,129 O% 1];005,5]1 - - 3X71,571 13.935,000 - 1,960.229 - - 3,072,552 - 1,112,323 17,006,571 3,031,58 13,935,000 31% 5,271,1131 2,900,229 15,760 21,110 6,500 3,012,552 - - - 1,11.323 11,850. $ )3,311,008) ti3% F 08450 20,450 28,000 - - 094 - 61,559 61,559) $ 77,319 036 48450 20,450 28p0o - - 12,319 21,110 6,5110 - - (49,709) - - 112,129 - - (112729) By, 51% 383,040 383,40 112,129 )112,129) $ TITU9 $ )168,82) 0% 672,000 - - 68,000 - - 214,818 - - 666,766 - 451,908 214,818 - - 666,166 - 453,948 vZoIST - - 68,000 - - 3$00 3,500 O% - - - 150406. 1,530 11190 (M7,46) $ 150,406 0% 3,500 3154 IMAM 1$30 1,190 - )141,68%) (24,713) - IA85 - - o% 3]% - 6y3Y1,949 (24,715). 24,715 $ (24,715) $ )38651,264) 0% t.6% 14$12,834 33,869,300 MAISA63 59,033,41 33,935,000 I,MOp4 33,80,685 4.532,317 9,741,241 61,318,066 43,476 41$20,425 ATTACHMENT 3 - SIX MONTH - REPORTABLE VARIANCE NOTES OPERATING REPORTABLE VARIANCE NOTES No variance to report in 02. CAPTIAL REPORTABLE VARIANCE NOTES A The Q2 variance in Erosion Management is related to a number of major capital works projects being delayed in Q1 resulting in the under expenditure including: Gibraltar Point which was delayed due to inclement spring weather; East Don Trail which is related to the timing of invoices; and Ashbridges Bay which is still awaiting agreement execution prior to mobilization; Upper Highland Creek trail at Ellesmere which is continuing through the approvals phase; DMAF infrastructure projects which are in negotiations with private land owners and anticipated to be initiated once the agreements are executed in Q3 -Q4 of 2019; and a number of other major works which are temporarily delayed as a result of agreement execution and negotiations. Once these are taken into account the variance is ($1,166) which is within the acceptable threshold (5%). B The under expenditure is as a result of delays in the approvals from the National Disaster Mitigation Program for the Pickering and Ajax Flood Control Dyke Restoration Environmental Assessment. Now that approvals are secured, the project is forecasted to be on track as of Q4 with an anticipated completion in Q1 2020. Once this is taken into account, the variance is ($499), which is within the acceptable threshold. C The under expenditure is as a result of Seaton Development monitoring field work which is planned to take place in Q4. Once this Seaton field work is taken into account, the variance is ($496) which is within the acceptable threshold. D The Meadoway revitalization project is underspent as a result of a shift in the timing of priority projects. Additionally, the Menno-Reesor Restoration and Renovation project will continue to be underspent in 2019 as a result of a reduction in the scope of work following the transfer of Toronto Wildlife Center to Parks Canada. Once these facts are taken into account, the variance is ($212) which is within the acceptable threshold. E The under expenditure in the trails program area is as a result of delays related to City of Toronto fee-for-service work. Contributing to the delays were the Lake Ontario high water levels in the spring, and that additional trail projects will be initiated in Q3 following the execution of agreements in Q2. Once these explanations are taken into account, the variance is ($241) which is within the acceptable threshold. F The under expenditure is related to the Head Office Construction Project which is due to the delay in obtaining site plan approval due to negotiations with Tennis Canada . Once this delay is taken into consideration, the variance is ($369) which is within the acceptable threshold. Section IV — Ontario Regulation 166/06, As Amended RES.#6107/19 - STANDARD DELEGATED PERMITS Moved by: Joanne Dies Seconded by: Gord Highet THAT standard delegated permits, permission for routine infrastructure works, minor works letters of approval, and permits after the fact / resolution of violations granted by Toronto and Region Conservation Authority staff, in accordance with Ontario Regulation 166/06, as amended, which are listed below, be received. CARRIED STANDARD DELEGATED PERMITS FOR RECEIPT— STAFF APPROVED AND ISSUED Delegated Permits are processed by Planning and Development Division staff, authorized by designated staff appointed as Enforcement Officers by the Board of Directors and received monthly by the Executive Committee. Delegated permits are categorized as standard, routine infrastructure works, emergency infrastructure works, minor works and permits after the fact/resolution of violations. Standard permits are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years or less. CITY OF BRAMPTON CITY OF BRAMPTON - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a flood storage compensation wetland located on municipal owned lands at 0 Pannahill Drive in the City of Brampton. The works are associated with a proposed development located at 9452 The Gore Road (CFN: 60129). CFN: 61988 - Application #: 0831/19113RAM Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca For information contact: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca Date: September 10, 2019. GORE (MOSAIK) INC. - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of 114 condominium townhouses in 6 blocks located at 9452 The Gore Road in the City of Brampton. The works are associated with a municipal Zoning Bylaw Amendment (City File: C09E08.021) and Site Plan Application (City File: SP17-089). CFN: 60129 - Application #: 0706/18/13RAM Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca For information contact: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca Date: September 10, 2019 144 AVONDALE BOULEVARD - Etobicoke Creek Watershed The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek Watershed in order to create a secondary residential unit in the basement of an existing dwelling located at 144 Avondale Boulevard, in the City of Brampton. The works include installing one (1) new window and are associated with a municipal building permit. CFN: 61497 - Application #: 0515/191BRAM Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca Date: September 12, 2019 CITY OF MARKHAM 4031 SIXTEENTH AVENUE (UNIONVILLE) INC. - Rouge River Watershed The purpose is to conduct site grading within a Regulated Area of the Rouge River watershed related to a draft approved plan of subdivision (19T16M04), at 4031 16th Avenue, in the City of Markham. CFN: 62004 - Application #: 0883/191MARK Report Prepared by: Linda Bui, extension 5289, email linda.bui@trca.ca For information contact: Quentin Hanchard, extension 5324, email quentin.hanchard@trca.ca Date: August 23, 2019 ANGUS GLEN DEVELOPMENTS LTD. - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed to facilitate the clean out of the existing Stormwater Management Pond C (Angus Glen West Village) and restoration of disturbed areas associated with the pond cleanout located on the east side of Stollery Pond Crescent, Markham. CFN: 61969 - Application #: 0794/19/MARK Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca Date: September 3, 2019 CITY OF MARKHAM - Don River Watershed The purpose is to undertake clean out and restoration of an online wet Stormwater Management (SWM) pond (Pond 9), located south west of Highway 7 and Leslie Street, in the City of Markham. The works will include removal of accumulated sediments in two forebay areas, construction of two access roads and restoration of eroded section of channel immediately upstream of the pond. The warm water construction timing window will apply to the works. CFN: 60740 - Application #: 0339/19/MARK Report Prepared by: Harsha Gammanpila, extension 5629, email harsha.gammanpila@trca.ca For information contact: Harsha Gammanpila, extension 5629, email harsha.gamma npila@trca.ca Date: August 26, 2019 CITY OF RICHMOND HILL BAIF DEVELOPMENTS LIMITED - Rouge River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of an approved draft plan of subdivision (19T- 93027) associated with a municipal site plan application, minor variance application and building permit application. CFN: 59926 - Application #: 0536/18/RH Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca Date: September 19, 2019 CITY OF RICHMOND HILL - Humber River Watershed The purpose is to undertake reconstruction of Coons Road, from Humberland Drive/Greyfriars Avenue to Yonge Street. The proposed works include construction of a 9.5 m wide two lane roadway with a new 1.8 m wide concrete sidewalk on the west side of the roadway, storm sewers, drainage ditches, watermain and associated infrastructure. There are no in -water or near -water works involved within the scope of this project. CFN: 59742 - Application #: 0428/18/RH Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca Date: September 3, 2019 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 67 ENFIELD AVENUE - Etobicoke Creek Watershed The purpose is to construct a rear wood deck to the one -storey single family dwelling at 67 Enfield Avenue in the City of Toronto (Etobicoke York Community Council Area). CFN: 61445 - Application #: 0397/19/TOR Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 13, 2019 ISLINGTON GOLF CLUB - Mimico Creek Watershed The purpose is to implement interim erosion mitigation measures for a portion of Mimico Creek on the 11th fairway at Islington Golf Course (45 Riverbank Drive) in the City of Toronto (Etobicoke York). CFN: 61943 - Application #: 0786/19/TOR Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca Date: September 18, 2019 64 SPRINGBROOK GARDENS - Mimico Creek Watershed The purpose is to construct a new two storey single family detached dwelling, inground pool, and associated ancillary structures at 64 Springbrook Gardens in the City of Toronto (Etobicoke York). The existing dwelling is to be demolished. CFN: 58229 - Application #: 0813/171TOR Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 5, 2019 57 NORTH DRIVE - Humber River Watershed The purpose is to construct a partial second storey addition, and front addition to the existing single storey, detached dwelling at 57 North Drive in the City of Toronto (Etobicoke York). Included in the scope of the approved works is a rear patio, inground pool, and associated hard and soft landscaping in the rear yard. CFN: 61326 - Application #: 0329/19/TOR Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca Date: April 4, 2019 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 1682 VICTORIA PARK AVENUE INC. - Don River Watershed The purpose is to replace an existing 300 mm diameter sanitary sewer on Anewen Greenbelt/Charles Sauriol Conservation Area, located west of Victoria Park Avenue and north of Eglinton Avenue, in the City of Toronto. No in -water work is within the scope of this project. CFN: 59942 - Application #: 0545/181TOR Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca For information contact: Leila Sotoudeh, extension 5925, email lei la.sotoudeh@trca.ca Date: August 21, 2019 CITY OF TORONTO - Don River Watershed The purpose is to construct a new 350 m access trail near 701 Don Mills Road, south of Overlea Boulevard and Don Mills Road, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61900 - Application #: 0806/19/TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 10, 2019 CITY OF TORONTO - Don River Watershed The purpose is to remove and replace an existing storm sewer and manhole on Valley Woods Road Municipal Right -of -Way adjacent to 1213 - 1229 York Mills Road in the City of Toronto (North York Community Council). CFN: 61926 - Application #: 0743/19/TOR Report Prepared by: Mark Rapus, extension 5259, email mark.rapus@trca.ca For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca Date: September 5, 2019 66 ARJAY CRESCENT - Don River Watershed The purpose is to construct a new swimming pool to the rear of the existing two storey single family dwelling at 66 Arjay Crescent in the City of Toronto (North York Community Council Area). CFN: 62098 - Application #: 0908/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 10, 2019 32 MEDALIST ROAD - Don River Watershed The purpose is to construct a two-storey replacement dwelling with rear walk -out, soakaway pit and associated landscaping at 32 Medalist Road in the City of Toronto (North York Community Council Area). CFN: 61924 - Application #: 0746/19/TOR Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 10, 2019 54 GWENDOLEN CRESCENT - Don River Watershed The purpose is to construct a two storey replacement dwelling with attached rear deck and basement walkout where an existing two storey single family detached dwelling is currently located at 54 Gwendolen Crescent in the City of Toronto (North York Community Council Area). CFN: 61010 - Application #: 0100/19/TOR Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 10, 2019 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 22 CAVEHILL CRESCENT - Don River Watershed The purpose is to construct a one storey addition to the north, a secondary dwelling unit in the basement, an at grade deck to the rear, and a new front porch where an existing one storey single family detached dwelling is currently located at 22 Cavehill Crescent in the City of Toronto (Scarborough Community Council Area). CFN: 61129 - Application #: 0200/191TOR Report Prepared by: Stephanie Worron, extension 5907, email step hanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: August 27, 2019 559 MEADOWVALE ROAD - Highland Creek Watershed The purpose is to construct a partial second storey addition over the existing single family dwelling at 559 Meadowvale Road in the City of Toronto (Scarborough Community Council Area). CFN: 62100 - Application #: 0919/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 17, 2019 SUNCOR ENERGY INC. - Highland Creek Watershed The purpose is to construct new electric vehicle charging stations at the existing Petro Canada gas station at 3100 Ellesmere Road in the City of Toronto (Scarborough Community Council Area). CFN: 62012 - Application #: 0810/191TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: August 29, 2019 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 69 LESLIE STREET - Don River Watershed The purpose is to construct a detached garage to the rear of the existing dwelling at 69 Leslie Street in the City of Toronto (Toronto and East York Community Council Area). CFN: 61645 - Application #: 0577/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 19, 2019 CITY OF TORONTO - Don River Watershed The purpose is to undertake trail improvements and the construction of a riverine wetland at the Cottonwood Flats site, just west of 66 Beechwood Drive, in the City of Toronto. The warm water construction timing window will apply to this project. CFN: 59947 - Application #: 0674/181TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 13, 2019 CITY OF TORONTO - Don River Watershed The purpose is to undertake construction of a nature trail on Chorley Park, south of Summerhill Avenue and Douglas Drive, in the City of Toronto. The works will include installation of a lookout, construction of approximately 1 meter wide natural surface trail, removal of asphalt and wooden staircase for restoration and regeneration. CFN: 61832 - Application #: 0709/19/TOR Report Prepared by: Harsha Gammanpila, extension 5629, email harsha.gamma npila@trca.ca For information contact: Harsha Gammanpila, extension 5629, email harsha.gammanpila@trca.ca Date: August 28, 2019 CITY OF TORONTO ECONOMIC DEVELOPMENT CORPORATION - Don River Watershed The purpose is to construct a 2 storey building at 945 Lake Shore Boulevard East in the City of Toronto (Toronto and East York Community Council Area). CFN: 62088 - Application #: 0885/191TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 9, 2019 EVERGREEN - Don River Watershed The purpose is to install five temporary art sculptures in Riverdale Park West, near Bayview Avenue and River Street, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61983 - Application #: 0826/19/TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 5, 2019 181 HUDSON DRIVE - Don River Watershed The purpose is to construct a third storey addition over the existing footprint and to underpin the basement in order to increase ceiling height at 181 Hudson Drive in the City of Toronto (Toronto and East York Community Council Area). CFN: 60961 - Application #: 0061/19/TOR Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 13, 2019 68 SUMMERHILL GARDENS - Don River Watershed The purpose is to construct a two-storey rear and side addition and to underpin the basement in order to increase ceiling height at 68 Summerhill Gardens in the City of Toronto (Toronto and East York Community Council Area). CFN: 61450 - Application #: 0444/19/TOR Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 10, 2019 8 WILDWOOD CRESCENT - Don River Watershed The purpose is to construct a one storey addition to the rear of the existing two storey single family detached dwelling at 8 Wildwood Crescent in the City of Toronto (Toronto and East York Community Council Area). CFN: 61014 - Application #: 0097/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 11, 2019 415 HEATH STREET EAST - Don River Watershed The purpose is to construct a two storey single family dwelling at 415 Heath Street East in the City of Toronto (North York Community Council Area). CFN: 60706 - Application #: 1145/18/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 9, 2019 TORONTO DISTRICT SCHOOL BOARD - Don River Watershed The purpose is to replace the existing asphalt and complete minor grading work at the existing City Adult Learning Centre (Toronto District School Board) at 1 Danforth Avenue. CFN: 62104 - Application #: 0949/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 19, 2019 CITY OF VAUGHAN 2045412 ONTARIO INC. - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a new single residential dwelling with a footprint of 110 sq. m. (1188 sq. ft.) on lands known municipally as 23 Isa Court, in the City of Vaughan. CFN: 62038 - Application #: 0936/19/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen. bon ner@trca.ca Date: September 10, 2019 2665780 ONTARIO LIMITED - Humber River Watershed The purpose is to undertake works within a Regulated Area of the Humber River watershed to facilitate site development, including earthworks, servicing, landscaping and edge management restoration including a 5 -metre wide soft landscape strip on the property municipally known as 21 Keyes Court, in the City of Vaughan in association with the construction of one (1), 1 -storey (8,144.8 sq. m.) multi -unit employment building. A portion of the site servicing, grading works, parking areas and landscaping/edge management are within TRCA's Regulated Area and are adjacent to the open space channel on the neighbouring lands. Additional landscaping, parking and the construction of the 1 -storey building are also being constructed on the subject lands, but beyond TRCA's Regulated Area. CFN: 61933 - Application #: 0759/19/VAUG Report Prepared by: Mark Andrews, extension 5936, email mark.andrews@trca.ca For information contact: Mark Andrews, extension 5936, email mark.andrews@trca.ca Date: September 4, 2019 2665780 ONTARIO LIMITED - Humber River Watershed The purpose is to undertake works within a Regulated Area of the Humber River watershed to facilitate site development, including earthworks, servicing, landscaping and edge management restoration including a 5 -metre wide soft landscape strip on the property municipally known as 41 Keyes Court, in the City of Vaughan in association with the construction of one (1), 1 -storey (9,144.51 sq. m.) multi -unit employment building. A portion of the site servicing, grading works, parking areas and landscaping/edge management are within TRCA's Regulated Area and are adjacent to the open space channel on the neighbouring lands. Additional landscaping, parking and the construction of the 1 -storey building are also being constructed on the subject lands, but beyond TRCA's Regulated Area. CFN: 61953 - Application #: 0827/19/VAUG Report Prepared by: Mark Andrews, extension 5936, email mark.andrews@trca.ca For information contact: Mark Andrews, extension 5936, email mark.andrews@trca.ca Date: August 30, 2019 31 KEYES COURT LP - Humber River Watershed The purpose is to undertake works within a Regulated Area of the Humber River watershed to facilitate site development, including earthworks, servicing, landscaping and edge management restoration including a 5 -metre wide soft landscape strip on the property municipally known as 31 Keyes Court, in the City of Vaughan in association with the construction of one (1), 1 -storey (5,620.6 sq. m.) employment building. A portion of the site servicing, grading works, parking areas and landscaping/edge management are within TRCA's Regulated Area and are adjacent to the open space channel on the neighbouring lands. Additional landscaping, parking and the construction of the 1 -storey building are also being constructed on the subject lands, but beyond TRCA's Regulated Area. CFN: 61952 - Application #: 0830/19/VAUG Report Prepared by: Mark Andrews, extension 5936, email mark.andrews@trca.ca For information contact: Mark Andrews, extension 5936, email mark.andrews@trca.ca Date: September 4, 2019 5445 KIRBY ROAD - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a 62 sq. m. (672 sq. ft.) storage shed, and 63 sq. m. (678 sq. ft.) in -ground pool on lands known municipally as 5445 Kirby Road, in the City of Vaughan. CFN: 62068 - Application M 0861/191VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca Date: August 22, 2019 208 FIRGLEN RIDGE - Humber River Watershed The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, the development of a new dwelling with a footprint of 277 sq. m. (2981 sq. ft.) on a vacant lot of record known municipally as 208 Firglen Ridge, in the City of Vaughan. CFN: 61990 - Application #: 0833/19NAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca Date: August 15, 2019 TOWN OF AJAX 78 SPIERS CRESCENT - Carruthers Creek Watershed The purpose is to construct a deck at the rear of an existing two storey single family detached dwelling located at 78 Spiers Crescent in the Town of Ajax. CFN: 61946 - Application #: 0790/19/AJAX Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: August 27, 2019 TOWN OF CALEDON 9123 FINNERTY SIDE ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 4.8 m. by 13.4 m. replacement septic system at the rear of an existing dwelling located at 9123 Finnerty Sideroad in the Town of Caledon. CFN: 62101 -Application M 0921/19/CAL Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca For information contact: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca Date: September 17, 2019 8 ELLA COURT - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a 12.2 m by 6.1 m (40 ft by 20 ft) in ground swimming pool with surrounding patio area at the rear of an existing residential dwelling associated with a Site Plan Application (Town File #SPA -19-0023) and a municipal building permit. The subject property is located at 8 Ella Court, in the Town of Caledon. CFN: 61616 - Application M 0610/19/CAL Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca Date: September 12, 2019 ONTARI HOLDINGS LTD. - Humber River Watershed The purpose is to extend an existing culvert in order to facilitate the widening of Coleraine Drive as part of a municipal Site Plan Application. CFN: 62171 - Application M 0960/191CAL Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca Date: September 19, 2019 TOWN OF CALEDON - Humber River Watershed The purpose is to undertake road resurfacing of Horseshoe Hill Road from Elite Road to Charleston Sideroad. This proposal includes culvert work consisting of replacing five existing cross culverts (1-25A, 1-26, 1-28, 1-30 and 1-31A) and one existing driveway culvert (1-29) on Horseshoe Hill Road. The cold water construction timing window has been extended and will apply to this project. CFN: 61848 - Application #: 0761/19/CAL Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca Date: September 10, 2019 TOWNSHIP OF ADJALA-TOSORONTIO 1161 CONCESSION ROAD 7 - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 282.07 sq.m dwelling located at 1161 Concession Road 7 in the Town of Adjala-Tosorontio. Site works also include the construction of a septic system towards the front of the dwelling as well as an access driveway. CFN: 60513 - Application M 1159/18/ADJ Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca For information contact: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca Date: September 19, 2019 TOWNSHIP OF KING 172 NOBLETON LAKES DRIVE - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed to construct a new dwelling with attached garage, rear yard patio, driveway and septic system located at 172 Nobleton Lakes Drive, King. CFN: 62062 - Application #: 0862/19/KING Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca Date: September 4, 2019 PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS FOR RECEIPT — STAFF APPROVED AND ISSUED Permission for Routine Infrastructure Works, including Emergency Infrastructure Works permissions, are subject to authorization by staff designated as Enforcement Officers as per Authority Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure works are located within a regulated area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land. CITY OF BRAMPTON ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway along Ungava Bay Road from the intersection of Ungava Bay Road and Mountainash Road to south of the intersection of Airport Road and Eagle Plains Drive in the City of Brampton, Humber River Watershed; as located on property owned by the City of Brampton The purpose is to install a 4 inch diameter conduit along Ungava Bay Road from the intersection of Ungava Bay Road and Mountainash Road to south of the intersection of Airport Road and Eagle Plains Drive in the City of Brampton. No in -water work is associated with this project. CFN: 61095 - Application #: 0161/19/13RAM Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca Date: September 10, 2019 CITY OF MARKHAM CITY OF MARKHAM To undertake sewer and watermain or utility installation or maintenance within an existing roadway along Green Lane from Bayview Avenue to Leslie Street and Bullock Drive from Highway 7 to Laidlaw Boulevard, in the City of Markham, Don River and Rouge River Watersheds as located on the property owned by City of Markham. The purpose is to undertake streetlight upgrades along Green Lane from Bayview Avenue to Leslie Street and Bullock Drive from Highway 7 to Laidlaw Boulevard in the City of Markham. The proposed works involve installation of underground conduits and concrete poles within the regulated area. No in - water works associated with this project. CFN: 61838 - Application #: 0809/19/MARK Report Prepared by: Harsha Gammanpila, extension 5629, email harsha.gamma npila@trca.ca For information contact: Harsha Gammanpila, extension 5629, email harsha.gammanpila@trca.ca Date: September 6, 2019 ENBRIDGE GAS INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway at 300 Steelcase Road West, approximately 180 metres south of John Street, in the City of Markham, Don River Watershed; as located on property owned by a private landowner to whom Enbridge Gas Inc is providing service, and on property owned by the City of Markham under franchise agreement with Gas Inc. The purpose is to install a NPS 2 PE IP gas header service at 300 Steelcase Road West, approximately 180 metres south of John Street, in the City of Markham. No in -water work is associated with this project. CFN: 61999 - Application #: 0892/19/MARK Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Harsha Gammanpila, extension 5629, email harsha.gammanpila@trca.ca Date: September 10, 2019 CITY OF MISSISSAUGA ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway along Queen Frederica Drive in order to service private properties at 3105, 3125, 3145 Queen Frederica Drive in the City of Mississauga, Etobicoke Creek Watershed; as located on property owned by private landowners to whom Rogers Communications Canada Inc. is providing service at their request, and on property owned by the City of Mississauga. The purpose is to install a 1 to 3 inch diameter conduit along Queen Frederica Drive in order to service private properties at 3105, 3125, 3145 Queen Frederica Drive in the City of Mississauga. No in -water work is associated with this project. CFN: 61138 - Application #: 0236/19/MISS Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca Date: September 6, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway along Queen Frederica Drive in order to service private properties at 3045, 3065, 3085 Queen Frederica Drive in the City of Mississauga, Etobicoke Creek Watershed; as located on property owned by private landowners to whom Rogers Communications Canada Inc. is providing service at their request, and on property owned by the City of Mississauga. The purpose is to install a 1 to 3 inch diameter conduit along Queen Frederica Drive in order to service private properties at 3045, 3065, and 3085 Queen Frederica Drive in the City of Mississauga. No in - water work is associated with this project. CFN: 61137 - Application #: 0237/19/MISS Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca Date: September 6, 2019 CITY OF PICKERING CITY OF PICKERING To undertake road/pathway resurfacing or reconstruction on Brock Road, from Usman Road to Duffins Creek Bridge, in the City of Pickering, Duffins Creek Watershed as located on the property owned by the Regional Municipality of Durham. The purpose is to construct a 1.8 metre concrete sidewalk on the east side of Brock Road (Region Road #1), in the City of Pickering. The sidewalk will continue from the existing sidewalk south of Usman Road to Duffins Creek Bridge (north of Finch Avenue). No in -water works are associated with this project. CFN: 61796 - Application #: 0649/191PICK Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca Date: September 6, 2019 CITY OF PICKERING To undertake road/pathway resurfacing or reconstruction on 1105 Finch Avenue extending to the existing concrete path on Lydia Crescent, in the City of Pickering, Frenchman's Bay Watershed as located on the property owned by the City of Pickering. The purpose is to remove and replace existing asphalt path which extends from the northeast corner of 1105 Finch Avenue, due south to the existing concrete path on Lydia Crescent in the City of Pickering. No in -water work is associated with this project. CFN: 61996 - Application #: 0942/191PICK Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca Date: September 24, 2019 LEBOVIC ENTERPRISES INC. To undertake off-line stormwater management pond maintenance at 2520 Tillings Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering. The purpose is to undertake off-line stormwater management pond maintenance at 2520 Tillings Road in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering. No in -water works are associated with this project. CFN: 61807 - Application #: 0666/19/PICK Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca Date: August 30, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility watercourse crossing by trenchless technology along Voyager Avenue and Bonita Avenue at the Fairport Road intersection, crossing above Dunbarton Creek and within the regulated area south of Bonita Avenue, in the City of Pickering, Frenchman's Bay Watershed; as located on property owned by the City of Pickering. The purpose is to install a 75 millimetre diameter conduit along Voyager Avenue and Bonita Avenue at the Fairport Road intersection, crossing above Dunbarton Creek and within the regulated area south of Bonita Avenue, in the City of Pickering. No in -water work is associated with this project. CFN: 61884 - Application #: 0778/191PICK Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca Date: September 10, 2019 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) ENBRIDGE GAS INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on the east side of Keele Street between Ingram Drive and Canon Jackson Drive, City of Toronto, Humber River Watershed; as located on property owned by the City of Toronto under franchise agreement with Enbridge Gas Inc. The purpose is to install a NPS 4 ST YJ XHP gas pipeline on the east side of Keele Street between Ingram Drive and Canon Jackson Drive, City of Toronto. No in -water work is associated with this project. CFN: 61889 - Application #: 0780/191TOR Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Renee Afoom-Boateng, extension 5714, email renee.afoom- boateng@trca.ca Date: September 18, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Reid Manor and Humbervale Boulevard, between Sunnydale Drive and Grenview Boulevard South, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto. The purpose is to install new communication conduits and new vaults for Rogers Communications Canada Inc. on Reid Manor and Humbervale Boulevard, between Sunnydale Drive and Grenview Boulevard South, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61530 - Application #: 0572/19/TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 12, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Black Creek Boulevard, Rose Valley Crescent, Stoney Brooke Drive and Woodgate Drive, near Jane Street and St. Clair Avenue West, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto. The purpose is to install new communication conduits and new vaults for Rogers Communications Canada Inc. on Black Creek Boulevard, Rose Valley Crescent, Stoney Brooke Drive and Woodgate Drive, near Jane Street and St. Clair Avenue West, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61800 - Application #: 0644/19/TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 19, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Trethewey Drive and Black Creek Drive, between Todd Baylis Boulevard and Greenbrook Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto. The purpose is to install new communication conduits and new vaults for Rogers Communication Inc. on Trethewey Drive and Black Creek Drive, between Todd Baylis Boulevard and Greenbrook Drive, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61850 - Application #: 0753/191TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 25, 2019 TORONTO TRANSIT COMMISSION To undertake structure maintenance and to undertake sewer, watermain or utility installation or maintenance within an existing roadway on the northeast and southwest corners of Jane Street and Eglinton Avenue West, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto and Toronto and Region Conservation Authority (TRCA). The purpose is to construct access hub shelters on the northeast and southwest corners of Jane Street and Eglinton Avenue West, in the City of Toronto. No in -water work is within the scope of this project. CFN: 59955 - Application #: 0897/18/TOR Report Prepared by: Leila Sotoudeh, extension 5925, email leila.sotoudeh@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 24, 2019 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) IMPERIAL OIL LIMITED To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Windhill Crescent, near Weston Road and Finch Avenue West, in the City of Toronto (North York Community Council Area), Humber River Watershed as located on property owned by the Toronto and Region Conservation Authority under Management Agreement with the City of Toronto, the City of Toronto, Infrastructure Ontario, and the private properties located at 25 Windhill Crescent and 27 Windhill Crescent. The purpose is to conduct an integrity dig to inspect and determine the integrity of an existing pipeline located on Windhill Crescent, near Weston Road and Finch Avenue West, in the City of Toronto. No in -water works are within the scope of this project. CFN: 61224 - Application #: 0278/19/TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 25, 2019 ZAYO CANADA To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Sheppard Avenue West, between Seeley Drive and Northover Street, in the City of Toronto (North York Community Council Area), Humber River Watershed as located on property owned by the City of Toronto. The purpose is to overlash new fibre on existing hydro poles located on Sheppard Avenue West, between Seeley Drive and Northover Street, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61829 - Application #: 0812/191TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 25, 2019 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Shropshire Drive, Mendip Crescent and Lewiston Road, southwest of Ellesmere Road and Kennedy Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on property owned by the City of Toronto. The purpose is to install new communication conduits and new vaults for Rogers Communications Canada Inc. on Shropshire Drive, Mendip Crescent and Lewiston Road, southwest of Ellesmere Road and Kennedy Road, in the City of Toronto. No in -water work is within the scope of this project. CFN: 61372 - Application #: 0847/191TOR Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca Date: September 25, 2019 CITY OF VAUGHAN CITY OF VAUGHAN To undertake offline stormwater management pond maintenance on 10299 Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by the City of Vaughan. The purpose is to undertake cleanout works of the Westridge Drive stormwater management facility located north east of Highway 27 and Major Mackenzie Drive West. The warm water construction timing window will apply to the proposal. CFN: 61695 - Application #: 0631/19/VAUG Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 12, 2019 CITY OF VAUGHAN To undertake offline stormwater management pond maintenance on Forest Height Boulevard near Highway 27 and Nashville Road, in the City of Vaughan, Humber River Watershed as located on the property owned by the City of Vaughan. The purpose is to undertake clean out works of the Forest Height Boulevard stormwater management facility located north west of Highway 27 and Nashville Road. The warm water construction timing window will apply to the proposal. CFN: 61818 - Application #: 0702/19/VAUG Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 12, 2019 ENBRIDGE GAS INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on various streets in a new subdivision east of Pine Valley Drive and south of Teston Road in the City of Vaughan, Humber River Watershed; as located on property owned by the City of Vaughan under franchise agreement with Enbridge Gas Inc. The purpose is to install a NPS 2 PE IP gas pipeline being installed on various streets in a new subdivision east of Pine Valley Drive and south of Teston Road in the City of Vaughan. No in -water work is associated with this project. CFN: 61987 - Application #: 0846/19NAUG Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 10, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on 45 McClintock Crescent to 159 Conley Street, in the City of Vaughan, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to install conduit on the road right-of-way (ROW) of McClintock Crescent and Conley Street, in the City of Vaughan. The warm water construction timing window will apply to the proposal. CFN: 61975 - Application #: 0838/19/VAUG Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 19, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within road right-of-way (ROW) of McCabe Crescent, Burrows Street and Conley Street, in the City of Vaughan, Don River Watershed as located on the property owned by City of Vaughan. The purpose is to install Rogers conduit on the road right-of-way (ROW) of McCabe Crescent and Conley Street, in the City of Vaughan. The warm water construction timing window will apply to the proposal. CFN: 61976 - Application #: 0821/19/VAUG Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 19, 2019 TOWN OF AJAX ENBRIDGE GAS INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway in a new subdivision on the east side of Church Street, approximately 750 metres north of Rossland Road West in the Town of Ajax, Duffins Creek Watershed; as located on property owned by the Town of Ajax under franchise agreement with Enbridge Gas Inc. The purpose is to install NPS 2 and NPS 4 PE IP gas pipelines in a new subdivision on the east side of Church Street, approximately 750 metres north of Rossland Road West in the Town of Ajax. No in -water work is associated with this project. CFN: 61986 - Application #: 0845/191AJAX Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca Date: September 10, 2019 ROGERS COMMUNICATIONS CANADA INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Rossland Road, approximately 200 metres west of Woodcock Avenue, crossing below Miller's Creek, in the Town of Ajax, Duff ins Creek Watershed as located on property owned by the Town of Ajax. The purpose is to install a 75 millimetre diameter conduit on Rossland Road, approximately 200 metres west of Woodcock Avenue, crossing below Miller's Creek, in the Town of Ajax. No in -water work is associated with this project. CFN: 61688 - Application #: 0638/191AJAX Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca Date: September 10, 2019 TOWNSHIP OF KING BELL CANADA To undertake sewer, watermain or utility watercourse crossing by trenchless technology on the road right-of-way (ROW) of Station Road, in the Township of King, Humber River Watershed as located on property owned by the Township of King. The purpose is to install conduit, and pedestals within the road right-of-way (ROW) of Station Road, in the Township of King. The cold water construction timing window will apply to this proposal. CFN: 61977 - Application #: 0929/191KING Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca Date: September 24, 2019 MINOR WORKS LETTER OF APPROVAL FOR RECEIPT — STAFF APPROVED AND ISSUED Permission for Minor Works Letter of Approval are issued for works located within a regulated area, adjacent to a natural feature or natural hazard, that do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land. Permissions include ancillary structures such as decks, garages, sheds, pools and minor fill placement/landscaping. CITY OF BRAMPTON 13 GOSFIELD AVENUE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 29, Plan, (13 Gosfield Drive), in the City of Brampton, Etobicoke Creek Watershed. CFN: 61958 - Application #: 0867/19/BRAM Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca Date: September 16, 2019 72 MIDSUMMER DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 66, Plan M1798, (72 Midsummer Drive), in the City of Brampton, Humber River Watershed. CFN: 62097 - Application #: 0907/19/BRAM Report Prepared by: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca For information contact: Nicholas Cascone, extension 5927, email nicholas.cascone@trca.ca Date: September 16, 2019 CITY OF MISSISSAUGA 3250 VICTORY CRESCENT To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 82, Plan 828, (3250 Victory Crescent), in the City of Mississauga, Mimico Creek Watershed. CFN: 62048 - Application #: 0945/19/MISS Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca Date: September 16, 2019 CITY OF PICKERING 1968 CALVINGTON DRIVE To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 24, 25, 26, Plan 65M-2624, Part Lot 17 & 18, Block 15, Plan 40M-2339, (1968 Calvington Drive), in the City of Pickering, Petticoat Creek Watershed. CFN: 61989 - Application #: 0832/19/PICK Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 13, 2019 CITY OF RICHMOND HILL 12 HARVEY COURT To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 43, Concession 1 WYS, (12 Harvey Court), in the City of Richmond Hill, Don River Watershed. CFN: 62076 - Application #: 0873/19/RH Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca Date: September 5, 2019 73 COLLIN COURT To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 56, Concession 1 WYS, (73 Collin Court), in the City of Richmond Hill, Don River Watershed. CFN: 62057 - Application #: 0840/19/RH Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca Date: September 3, 2019 49 TOPHAM CRESCENT To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 35, Plan 65M-2453, (49 Topham Crescent), in the City of Richmond Hill, Don River Watershed. CFN: 62060 - Application #: 0866/191RH Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca Date: September 5, 2019 CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA) 94 MEADOWVALE DRIVE To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 52, Plan 2467, (94 Meadowvale Drive), in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. CFN: 61957 - Application #: 0877/191TOR Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca Date: September 10, 2019 CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 213 THREE VALLEYS DRIVE To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Lot 333, Plan 5112 - YORK, (213 Three Valleys Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 61950 - Application #: 0823/191TOR Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: August 29, 2019 12 SALONICA ROAD To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Part Of Lot 137 Lot 138, Plan M-809, (12 Salonica Road), in the City of Toronto (North York Community Council Area), Don River Watershed. CFN: 61956 - Application #: 0876/19/TOR Report Prepared by: Antonietta Gentile, extension 5796, email antonietta.gentile@trca.ca For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca Date: August 27, 2019 CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA) 52 BRUMWELL STREET To change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 5, Plan 66R-30384 PART 1, (52 Bruwmwell Street), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: 62096 - Application #: 0905/19/TOR Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 16, 2019 83 COLONEL DANFORTH TRAIL To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 24, 25, Plan 2546, (83 Colonel Danforth Trail), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. CFN: 62074 - Application #: 0879/191TOR Report Prepared by: Stephanie Worron, extension 5907, email stephanie.worron@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: September 10, 2019 CITY OF VAUGHAN 110 RIVIERA DRIVE To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 158, Plan M1863, (110 Riviera Drive), in the City of Vaughan, Don River Watershed. CFN: 61816 - Application #: 0688/19/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 4, 2019 115 STALLIONS COURT To install a swimming pool on Part Lot 1, Concession 4 Lot 10, Plan, (115 Stallion Court), in the City of Vaughan, Humber River Watershed. CFN: 62058 - Application #: 0880/19/VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: August 28, 2019 77 CARMEN CRESCENT To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 10, Concession 6, (77 Carmen Crescent), in the City of Vaughan, Humber River Watershed. CFN: 62067 - Application #: 0841/19/VAUG Report Prepared by: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca For information contact: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca Date: August 28, 2019 266 FARRELL ROAD To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 18, Plan 65M4425, (266 Farrell Road), in the City of Vaughan, Don River Watershed. CFN: 62073 - Application #: 0875/191VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: August 29, 2019 336 UPPER POST ROAD To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 15, Plan 65M-4053, (336 Upper Post Road), in the City of Vaughan, Don River Watershed. CFN: 62032 - Application #: 0928/191VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 12, 2019 56 ANNSLEYWOOD COURT To install a swimming pool on 56 Annsleywood Court, in the City of Vaughan, Humber River Watershed. CFN: 62095 - Application #: 0918/191VAUG Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 12, 2019 TOWN OF CALEDON 21 SUNSHINE MOUNTAIN DRIVE To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 21 Sunshine Mountain Drive, in the Town of Caledon, Humber River Watershed. CFN: 62086 - Application #: 0890/19/CAL Report Prepared by: Andrea Terella, extension 5657, email andrea.terella@trca.ca For information contact: Andrea Terella, extension 5657, email andrea.terella@trca.ca Date: September 12, 2019 TOWN OF WHITCHURCH-STOUFFVILLE 48 WILDERNESS TRAIL To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 2, Plan 65M-2841, (48 Wilderness Trail), in the Town of Whitch urch-StouffviIle, Rouge River Watershed. CFN: 62094 - Application #: 0894/19/WS Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 16, 2019 127 DOUGHERTY CRESCENT To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part 1, Lot 19 Plan 65R-29160, (127 Dougherty Crescent), in the Town of Whitch urch-StouffviIle, Rouge River Watershed. CFN: 62069 - Application #: 0878/19/WS Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca Date: August 28, 2019 TOWNSHIP OF KING 82 CHUCK ORMSBY CRESCENT To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 2, Concession 3, (82 Chuck Ormsby Crescent), in the Township of King, Humber River Watershed. CFN: 62039 - Application #: 0937/19/KING Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 17, 2019 45 RIA COURT To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 32, Plan 65M-4497, (45 Ria Court), in the Township of King, Humber River Watershed. CFN: 62091 - Application #: 0895/19/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: September 12, 2019 112 NORMAN DRIVE To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 30, Plan 573, (112 Norman Drive), in the Township of King, Humber River Watershed. CFN: 62066 - Application #: 0859/19/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: August 29, 2019 38 ELIZABETH DRIVE To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on 38 Elizabeth Drive, in the Township of King, Humber River Watershed. CFN: 62075 - Application #: 0874/19/KING Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: August 29, 2019 69 FAIRMONT RIDGE TRAIL To install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on 7 Plan 65M- 4443, (69 Fairmont Ridge Trail), in the Township of King, Humber River Watershed. CFN: 62082 - Application #: 0863/191KING Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca Date: August 29, 2019 PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS FOR RECEIPT — STAFF APPROVED AND ISSUED Permission for works undertaken without the benefit of a TRCA permit in a regulated area, where such works comply with TRCA policies and procedures, are considered permits after the fact and subject to an additional administrative fee. CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA) 17 LICHEN PLACE - Don River Watershed The purpose is to legalize the as -built landscaping walls and placement of interlock pavers to the rear of the existing single family dwelling at 17 Lichen Place in the City of Toronto (North York Community Council Area). CFN: 62063 - Application #: 0852/191TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca Date: August 21, 2019 CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA) 22 ROSE PARK CRESCENT - Don River Watershed The purpose is to legalize the as -built retaining walls and stairs to the rear of the existing single family dwelling and detached garage at 22 Rose Park Crescent in the City of Toronto (Toronto and East York Community Council Area). CFN: 61112 - Application #: 0142/19/TOR Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca Date: September 13, 2019 ADJOURNMENT ON MOTION by Ronald Chopowick, the meeting terminated at 10:27 a.m., on October 4, 2019. Jennifer Innis Chair Fi,1 John MacKenzie Secretary -Treasurer