HomeMy WebLinkAbout03-20-Minutes_Board_of_Directors_2020-04-24Toronto and Region
Conservation
Authority
Board of Directors Meeting #3/20 was held via videoconference, on Friday, April 24, 2020,
pursuant to section C.12, subsections (3) and (4), of the TRCA's Board of Directors
Administrative By -Law. The Chair Jennifer Innis, called the meeting to order at 9:46 a.m.
PRESENT
Jennifer Innis
Chair
Jack Heath
Vice -Chair
Paul Ainslie
Member
Kevin Ashe (out: 10:59 a.m.)
Member
David Barrow
Member
Shelley Carroll (out: 11:59 a.m.)
Member
Ronald Chopowick
Member
Joanne Dies
Member
Jennifer Drake
Member
Chris Fonseca
Member
Xiao Han
Member
Gordon Highet
Member
Linda Jackson
Member
Maria Kelleher
Member
Cynthia Lai
Member
Mike Layton (out: 11:54 a.m.)
Member
Basudeb Mukherjee
Member
James Pasternak
Member
Steve Pellegrini
Member
Anthony Perruzza (in: 9:55 a.m.)
Member
Gino Rosati
Member
Rowena Santos
Member
Don Sinclair
Member
Estair Van Wagner
Member
ABSENT
Dipika Damerla
Member
Paula Fletcher
Member
Michael Palleschi
Member
Connie Tang
Member
The Chair recited the Acknowledgement of Indigenous Territory.
RES.#A21/20 - MINUTES
Moved by: Joanne Dies
Seconded by: Rowena Santos
THAT the Minutes of Meeting #1/20, held on February 21, 2020, be approved.
CARRIED
DELEGATIONS
RES.#A22/20 -
Moved by:
Seconded by:
DELEGATION 4.1
Linda Jackson
Jack Heath
THAT delegation under Agenda Item 4.1. from Mr. Leith Coghlin, Managing Director,
EnPointe Development Inc., in regard to agenda item 10. 1.1 - Request for Exchange of
Toronto and Region Conservation Authority -owned Land, be received.
CARRIED
PRESENTATIONS
5.1 A presentation by Natalie Blake, Chief Human Resources Officer, TRCA, in regard to
Board of Directors COVID-19 Briefing.
RES.#A23/20 - PRESENTATION 5.1
Moved by: Jack Heath
Seconded by: Jennifer Drake
THAT above -noted presentation 5.1 be received.
CARRIED
Board of Directors COVID-19 Briefing
Natalie Blake
Chief Human Resources Officer
April 24, 2020
Toronto and Region
Conservation
Authority
Executive Summary
This presentation provides a briefing on TRCAs strategic
and tactical response to COVID-19:
• Background
• COVID-19 Response ata Glance
• COVID-19 Dashboard
• Phased Management of COVID-19
• Prevention
• Control
• Management
• Recovery
• Post COVID-19 —Growth Focus
Background
COVID-19, a strand of coronavirus, has emerged as a
significant risk to the personal wellbeing of TRCA's
employees and our operational success.
Due to the uncertain, complex, and ambiguous effects
COVID-19 is having, TRCXs Senior Leadership Team
(SLT) has responded expeditiously, with the protection of
our employees, stakeholders and public interest being
our critical priority.
The SLT has faced extremely difficult decisions to lead
during this unprecedented times in an effort to mitigate
the extent of impact on employees, TRCA operations
and the organization.
COVI13-19 Response at a Glance
Commenced
Pandemic Flu &
TRCA Flexible and
Provincial Non-essential
Declared
COVID-19
Infectious Illness
Remote Work
Workplaces Closure
Emergency
planning &
Policy approved;
commences and
Order, review and
Leaves (DEL)
employee (EE)
Interim Pandemic
support tools
calibration of TRCA
issued
communications
Plan developed
developed
operations
Policy, planning
and procedure
development
and
documentation
0
Late
January
February
SILT Pandemic
Response
Committee daily
scrums commenced;
Cancellation of
Maple Syrup
Festivals, March
Break camps &
related events
Provincial State of
Emergency
issued; public
closure of TRCA
facilities, parks,
education centres
and offices
Incident
Management
System (IMS) &
Field Procedures
instituted;
Contingency Plan for
Essential Services
and Facilities
approved
Redeployment
Program executed
(21 positions, 69
opportunities)
0 0 0 0
March 30 March 13 March 15 March 17 March 20 March 23
PHASEII - CONTROL PHASE III - MANAGEMENT
April April
COVID-19 Dashboard
Redeployment Opportunities
21 Redeployment positions
69 Redeployment vacancies
45 Displaced employees
expressed interest
2-4 misplaced employees
applied for opportunities
EAP Utilization
�.
e�
A
c.nra
'9Q %
s�
a.mtte
Increase in utilization
of ComPsych EAP
supports
m.�
arm s
Education & Training
Parks & Culture
Corporate Services
Restoration & Infrastructure
81
74
4
4
Projected 2020 Authority
Generated Loss
Up to
50%
X&
Remote Workplans
484 employees
have a flexible or
remote workplan in
place
Declared Emergency
Leaves(DEL)Issued
22.4% t
22 4% (163) of The number
employees were of DEUs is
issued a DEL expected to
increase
If I: IM1,1 01►11 DID 110I111l
COVID-19
Resources
o+
Q1 WSIB and Sick Leave Stats 49-
12 20% 9,509 12%
10 decrease 9,000 IM decrease
8 � 9;246
s a,50o
a a,oao
2 8,122
0 7,500
WSIB Sick Hours
2019 -2020 - 2019 - 2020
Phase I =Prevention
Legislation, Policy
Process Review
• Daily review of
government and
legislation updates
• Pandemic Flu &
Infection Illness Policy
• Interim Pandemic Plan
completed
• Contingency Plan for
Essential Services and
Facilities developed
• Identification of
essential roles and
three levels of back-up
Communication Strategy
• Frequent, clear and
transparent
communications
• Communications cater
to different needs based
on audience
• Utilization of reputable
sources for information
• Communicating via
multiple times in various
mediums (Hub, email,
verbal) to ensure
adoption
Change Management
Monitoring/Tracking
Protocol for
Clear messaging
for managers
tracking and
management of
Facility changes to
cases
adjust to changing
• Ongoing
environment
assessment of
service -level
impacts
• Staffing plan to
ensure critical
positions can be
filled
COVID-19 Resources and Supports
Employee Communications & Staff Hub Content
• 20+ employee communications issued • 100+ employee letters issued due to Maple Syrup & March Break cancellations
• Hygiene procedures posters deployed to • Employee FAO's developed to support active and employees an Declared Emergency
all offices and field sites Leave (DEL)
r
• Mental Health and Wellness supports • Employee Assistance Program supports and communications
• 163 individual DEL letters issued • Benefits updates, Out of Country Travel changes
6ni
Credits & Cancellations • Interactive videos— hand washing,. use of sanitizer
olices, Plans and Procedures
• Pandemic Flu & Infectious Illness Policy Contingency Plan for Essential Services and Facilities
• Interim Pandemic Plan Incident Management System (IMS) & Field Procedures
• COVID-19 Management Decision Matrix Construction and Field Sites Signage for social distancing
• Recruitment procedures and messaging Essential Work vehicle signage and employee confirmation letters
• DEL procedures and legislative requirements Redeployment Program — procedures, communications, tools etc.
O! ote Remote Work Information
! � Guide to Managing a RemTeam developed and shared with all managers
• Employee Guide to Working Remotely developed and shared with all staff
• Ergonomics Guidelines and recommendations shared with all employees
• Technology supports and documentation for remote work and virtual meetings
• Employee remote workplan templates and requirements
SLT Scrum and Manager Tactical Calls
• SLT Pandemic Response Committee scrums held daily during height of pandemic and have moved to 1-2xlweek
• 5 Manager tactical calls held to share information and address manager specific questions
Phase II =Control
• Daily scrums Cancellation of
commenced to
Management of
provide cross
Public Health and
SLT Pandemic
Legislative
Response Team
Requirements
• SLT Pandemic
Cancellation of
Response
March Break and
Committee
Maple Syrup
established
events
• Daily scrums Cancellation of
commenced to
TRIECA and
provide cross
other TRCA
functional
sponsored events
support for time
sensitive and
Public closure of
critical
TRCA facilities,
decisions
parks, education
centres and
offices
• Shift to virtual
meetings
Incident Management
• Development of
COVI D-19
Management
Decision Matrix
• Implementation of
Manager Tactical
Calls
• Incident
Environmental
Scan
• Pulse check
with peer
Conservation
Authorities,
municipalities
and not -for -
profits to share
information
management of Ensure
TRCA COVID-19 consistency
related cases and alignment
• Recruitment placed of practices
on hold — filling of with peers and
only critical partners
positions
Flexible & Remote
Work
• Employee tools
to support
remote work
resources
• Supports to
create a healthy
and safe remote
workspace
• Managers guide
to support and
manage remote
employees
• Ergonomic
resources for
remote
employees
TRCA COVID-19 Management
Decision Matrix
Criteria 1: Quarantine or Self -Isolation as Directed by Public Health
rarantine or Self -isolation Criteria
Development of COVID-19 symptoms.
2 Exposure to individuals with COVID-19 symptoms.
3. Returning from travel outside of Canada.
4. Been in close contact with an individual that has recently travelled
outside of Canada and is experiencing fever and/or has anew or
Leave to provide care giving responsibilities (i.e. childcare or care of
daily(, per ESA.
Individuals who are immunocompromised.
Directed to self isolate through indirect contact (exposure through
Ouse or acquaintance) by Public Health.
!age 91
Where an employee is ill with
WID-19 or related symptoms the
nployee shall utilize sick leave, or
P work remotely if feasible (this
call bethe employees decision)
Every effortwill be made for
temative work arrangements for
at employee.
Employees are asked to speak to
eir supervisors If they are in this
1. For individuals required to self -
isolate or quarantine, everyeffort
will be madetoasses redeployment
opportunities if an alternative work
arrangement is not feasible.
Employees will be permitted to
e sick leave/short term disability,
cation, lieu time, family
nergency leave etc. ORthe ESA
proved Infectious Disease
iergency Leave (choice is the
nployees(. If the employee elects
rthe ESA leave, HR needs request
)Evia payroll to be issued.
Employees who are quarantined
at are not eligible for sick
ave/sTD, vacation etc., may be
svided a discretionary leave with
y as approved at the discretion of
e CEO per the Pnndermc &
I Criteria 2: Self -isolation not directed by Public Health I
Request for self -isolation due to living with high risk groups (i.e.
Requestforself-isolation due to being high risk (i.e. pregnant, infants
Request for self -isolation due to illness not related to COVID-19.
Request for self -isolation for social distancing (i.e, not utilizing public
age 91
If the employee is able to work
:ismatively, efforts will be made t
_ommodate the request.
Employees are asked to speak to
in situations where the
qee is a field worker
lingcontruction) there is
d ability to provide remote
Rather, efforts can be made to
rt isolalation in the field
1. Assessment of redeployment if
practical.
Note, in situations where the
employee is a field worker
(including contruction( there is
limited ability to redeploy.
Employees will be permitted to
e sick days/STD, vacation, lieu
ne, family care leave etc. ORthe
A approved Infectious Disease
iergency Leave (choice is the
nployees(. If the employee elects
r the FSA leave, HR needs request
)Evia payroll to be issued.
Phase III =Management
Continued operations
'Emer
Redeployment
Essential
Financial, Operational
Declared enc
9 yLeaves
Establish
Employee
Workplaces
and Resource
(DEL)
redeployment
Engagement 9 9
Order
Assessment
Create DEL roll-out
• Communication
Assessment of
• Balance risk with
plan
process
targeted to
Essential
org. viability
• Assessment of all
Create
audiences
Workplaces
• Ongoing hiring
TRCA positions to
redeployment
• Engagement a ement
Orders
freeze of non-critical
identify displacement
action plan
Survey
Calibration of
positions
• Issue DEL's (163)
Prepare
• Execution of
TRCA work
• Reduced staffing &
. Resources and
communication
COLA/Merit
and operations
hours
supports for
for execution of
• Focus on
to comply with
• Chair and SLT
impacted employees
redeployment
retention drivers
the Provincial
pursuing
p g
Logistical matters
• Provide training
Order
government
Maintain support of
to redeployed
• Leaders model
Incident
program stimulus
impacted employees
employees
empathy
p y
Management
opportunities
to
• Support
• Recognition
System (IMS)
Budgeting/staffing
ensue no delay f
ensure no delay for
employees
Program
& Field
exercise based with
federal supports
through the
• Work alignment
Procedures
varied lengths of
transition
instituted for
COVID-19 impact
• Shift to virtual
COVI D-19
onboarding
T RCA at Work
TRCA employees continue to
demonstrate their commitment to
safely delivering our valuable
services to stakeholders, partners
and members of the public.
• 17+ construction crews
• 484 employees with alternative
work arrangements
• 75+ field staff performing planting,
inspections etc.
• Positive feedback on service and
business continuity received from
multiple municipal partners and
industry stakeholders
servation Authority
Phase IV = Recovery
Communication
Recovery Strategy
• Continued
increase of
communications
for awareness
through variety of
mediums (tactical
calls, Leadership
Chats, TRCA Hub)
• Ongoing
engagement and
Communications
to displaced
employees
Phased Return for
Full Operations
• Prioritization of
regaining revenue
streams
• Staffing
requirements for
revenue
reintegration
• Operational
prioritization of key
work initiatives and
projects
• TRCA alignment
with key
stakeholders and
partners
EE Resources
• Clear
expectations
• EAP and
wellness
supports
• FAQ for
ongoing
support and
to address
common
questions
• Focus on
employee
wellbeing
• Change
management
supports
Mgr Resources
Heath and Safety
Managers
Prioritization
provided tools
and resources
Enhanced sanitation
• ti
to manage
practices
within the
• Review of SOP's an(
new work
field work procedure:
environment
• Agility to address
Adjustment to
shifting government
operational
directives e.g.
priorities
vaccination protocol,
Calibration of
health and safety
employee
requirements etc.
Performance
• Plan for potential 2nd
Development
wave of COVID-19
Program
objectives
EE Resources
• Clear
expectations
• EAP and
wellness
supports
• FAQ for
ongoing
support and
to address
common
questions
• Focus on
employee
wellbeing
• Change
management
supports
Post COVID-19 — Growth Focus
Leadership Focus
Focus on vision of the future, increased SILT communications, change management
to inspire and motivate staff, model transparency in all interactions, mindfulness in
decision making suited to the emerging 'new normal', being present, visible, and
available, clear and decisive post COVID-19 recovery plan.
Rost -mortem
Opportunities through lessons learned
impacts assessment –strategic lops
plans, prioritization of work, people,
service delivery, budget etc_; digital
infrastructure, governance models,
business disruption scenario planning.
Wellbeing — The Future of Work
Increased focus on holistic TRCA employee
well being (physical, mental and emotional
wellbeing); managing work -life integration,
Shift from health and wellness being a "perk'
to an entrenched requirement as a part of
the employee experience at TRCA.
Workforce Capability
Future -proof aur skills to keep up with
change_ Focus on creativity and cntica�
thinking rather than routinized tasks in a
shift to highly digitalized workforces.
Post COVID 19
Growth Focus
Culture and Engagement
Increased importance of workplace culture and
engagement—focusing on monitoring, managing and
curabng a culture by design..
Workplace Model Shift
Surge in remotelflexible work; vidual
collaboration, workplace reinlegration
strategy, change management, preparing to
do more with less, performance
measurement by results_
Transformed Talent Models
Assess talent implications of the new
environment and TRCA's strategy, iincrease in
skills -based hiring; increased digitalization will
provide ability to tap into a geographically
diverse talent pool.
Learning Transformation
Pivot TRCAs Learning Strategy, create
engaging virtual opportunities and
incorporating gamificalion, virtual reality to
leaming, blended learning opportunities_
Natalie Blake, Chief Human Resources Officer
natal ie. blake(a)-trca.ca
www.trca.ca
Toronto and Region
Conservation
Authority
Section I — Items for Board of Directors Action
RES.#A24/20 - 2020 BUDGET
Approval of Toronto and Region Conservation Authority's (TRCA) 2020
Budget, pre Covid-19, including municipal general (operating), capital
levies, grants, donations, contract services, application fees, user fees
and other revenues.
Moved by: Gordon Highet
Seconded by: James Pasternak
THAT the 2020 TRCA Budget, and all projects and programs therein, be adopted;
THAT TRCA staff be authorized to amend the 2020 Budget, to reflect actual 2019
provincial transfer payment allocations to set the amount of matching levy required by
the Conservation Authorities Act;
THAT the cost of property taxes imposed by municipalities be included as additional levy
to the participating municipalities where the lands are located, excluding the cost of
property taxes which are passed on to a third party under a lease or similar agreement;
THAT, except where statutory or regulatory requirements provide otherwise, TRCA staff
be authorized to enter into agreements with private sector organizations, non-
governmental organizations or governments and their agencies for the undertaking of
projects which are of benefit to TRCA and funded by the sponsoring organization or
agency, including projects that have not been provided for in the approved TRCA
budget;
AND FURTHER THAT authorized TRCA officials be directed to take such action as may
be necessary to implement the foregoing, including obtaining approvals and the signing
and execution of documents.
RECORDED VOTE
Paul Ainslie
Yes
Kevin Ashe
Yes
David Barrow
No Vote
Shelley Carroll
Yes
Ronald Chopowick
Yes
Dipika Damerla
Absent
Joanne Dies
Yes
Jennifer Drake
Yes
Paula Fletcher
Absent
Chris Fonseca
No Vote
Xiao Han
Yes
Jack Heath
Yes
Gordon Highet
Yes
Linda Jackson
Yes
Maria Kelleher
Yes
Cynthia Lai
Yes
Mike Layton
Yes
Basudeb Mukherjee
Yes
Michael Palleschi
Absent
James Pasternak
No Vote
Steve Pellegrini
Yes
Anthony Perruzza
Yes
Gino Rosati
Yes
Rowena Santos
Yes
Don Sinclair
Yes
Connie Tang
Absent
Estair Van Wagner
Yes
Jennifer Innis
Yes
THE MOTION WAS
CARRIED
BACKGROUND
TRCA's annual budget is partially funded by levies to the upper tier partner municipalities within
our jurisdiction as permitted under the Conservation Authorities Act and as set out in regulation.
The budget also includes funding from other revenue sources such as contract services, user
fees, application fees, internal charge backs, grants from other levels of government and
through fundraising or donations.
RATIONALE
Enclosed in Attachment 1 is the recommended 2020 Budget, which is composed of operating
and capital projects and programs.
Municipal Approvals
Preliminary budgets are prepared each year for submission to TRCA's partner municipalities.
Staff meet with municipal staff throughout the year, as required by the budget processes in our
partner upper tier municipalities and according to schedules that are set out by each
participating municipality. Presentations are made to partner municipality staff and their
respective committees and councils.
The funding identified in the recommended apportionment of the levies reflects the amounts that
the partner municipalities have approved in their 2020 budgets. Contributions from the City of
Toronto and the regional municipalities of Durham, Peel and York have received council
approval. The Township of Adjala-Tosorontio and the Town of Mono have been advised of
TRCA's levy request.
Notice of Meeting
As required by regulation, TRCA has provided 30 days' written notice to its partner
municipalities of the date of the meeting at which the Board of Directors will consider the
budget, which includes the approved municipal levies.
General Levy (Operating)
TRCA's total 2020 Operating Budget is set at $46 million, an approximate 1.8% increase over
2019. After considering all the factors that affect the general levy, including tax and interest
adjustments, year over year shifts in Current Value Assessment (CVA) and individual partner
municipal targets, TRCA has achieved total general levy funding in the amount of $15.4 million
representing an average increase over 2019 of 4.18%. The general levy has been allocated to
the participating partner municipalities as follows:
Partner Municipality
2019 General Levy
$
2020 General Levy
$
Change over
2019
Ad'ala-Tosorontio
8851
930
1 5.08
Durham
581,850
596,000
2.43
Mono
1,480
1,700
14.86
Peel
1,917,000
1,920,355
0.18
Toronto
8,908,335
9,470,412
6.31
York
3,418,630
3,458,490
1.17
TOTAL
14,828,180
15,447,887
4.18
Capital Budget Summary
TRCA's total 2020 Capital Budget is set at $184 million, an approximately 8.9% increase over
2019. Capital levy makes up $48 million of the budget which is roughly $3 million higher than
the 2019 budget. Capital projects are generally funded by partner municipalities on a
benefitting municipality basis. That is, with few exceptions, capital projects funded by a partner
municipality, are undertaken within that municipality. For TRCA, these projects are typically
undertaken as per a Memorandum of Understanding or Service Level Agreement which
highlights the importance of such agreements.
DETAILS OF WORK TO BE DONE
During the Covid-19 pandemic, TRCA is committed to introducing actions to support everyone's
health and well-being while remaining operationally sustainable. Recognizing that
circumstances are quickly evolving, TRCA is committed to monitoring, and acting swiftly to
address changing conditions. TRCA staff are projecting an expected decrease of 2020
budgeted revenues in excess of $20 million. These expected decreases are with certain
exceptions in the Tourism and Recreation stream (Black Creek Pioneer Village, Conservation
Parks, Bathurst Glen Golf Course, Events and Festivals) and Education and Outreach (School
Programs e.g. Kortright, Family and Community programs).
On April 9', 2020 numerous full-time, part-time and contract staff were placed on a Declared
Emergency Leave to mitigate impacts of lost revenues and further projected losses due to
Covid-19 restrictions. Some of these staff are being redeployed to essential service areas
primarily funded by municipal capital budgets.
The Senior Leadership Team will continue to keep the Board of Directors informed as TRCA
evaluates the evolving business needs of the Province, government agency and partner
municipalities, and other stakeholders based on duration of the Covid-19 restrictions and future
government directives.
TRCA staff will continue evaluating financial implications through the creation of a variety of
business models that account for potential operational scenarios arising from Covid-19 that may
impact TRCA's 2020 Budget. Staff will continue to work with partner municipalities, including
lower tier municipalities, to provide essential services and special projects where TRCA has
significant, specialized expertise.
Report prepared by: Jenifer Moravek, extension 5659
Emails: jenifer.moravekAtrca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: michael.tolenskv(&trca.ca
Date: April 3, 2020
Attachments: 1
Attachment 1: TRCA 2020 Budget
51
Toronto and Region
Conservation
Authority
2020 Budget
Operating and Capital
March 18, 2019
Table of Contents
Operating and Capital Budget
Operating Budget
Capital Budget
Operating and Capital Budget— by object classification - Service Area Details
Watershed Studies and Strategies
Water Risk Management
Regional Biodiversity
Greenspace Securement and Management
Tourism and Recreation
Planning and Development Review
Education and Outreach
Sustainable Communities
Corporate Services
2019 Operating and Capital Levy
2019 Basis of Apportionment — General Levy
Full -Time Equivalents by Service Area
Service Area Details
Watershed Studies and Strategies
Water Risk Management
Regional Biodiversity
Greenspace Securement and Management
Tourism and Recreation
Planning and Development Review
Education and Outreach
Sustainable Communities
Corporate Services
Operating and Capital Budget— excluding tangible capital asset expenditures
Operating and Capital Budget— by object classification — excluding tangible capital asset expenditures
1
3
5
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
30
Toronto and Region Conservation Authority
2020 Operating and Capital Budget
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial
Federal
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
1
2020
Budget
2019
Budget
Unaudited
2019
Actual
$Change
over 2019
Budget
%Change
over 2019
Budget
15,448,000
14,828,000
14,828,560
620,000
4.2%
59,892,000
59,425,000
44,144,673
467,000
0.8%
69,066,000
69,983,000
29,909,213
(917,000)
-1.3%
2,958,000
3,412,000
1,019,860
(454,000)
-13.3%
4,949,000
5,432,000
7,108,351
(483,000)
-8.9%
12,570,000
8,400,000
3,139,254
4,170,000
49.6%
-
-
-
-
0.0%
22,185,000
23,569,000
20,843,087
(1,384,000)
-5.9%
2,363,000
2,685,000
881,409
(322,000)
-12.0%
4,540,000
8,868,000
3,783,007
(4,328,000)
-48.8%
4,358,000
4,089,000
4,399,897
269,000
6.6%
2,721,000
1,259,000
1,342,486
1,462,000
116.1%
6,394,000
1,477,000
3,436,804
4,917,000
332.9%
730,000
716,000
601,171
14,000
2.0%
27,000
7,000
1,152,975
20,000
208,201,000
204,150,000
136,590,747
4,051,000
2.03/.
Toronto and Region Conservation Authority
2020 Operating and Capital Budget
Unaudited
$Change
%Change
2020
2019
2019
over2019
over -2019
Budget
Budget
Actual
Budget
Budget
Expenditures
Watershed Studies and Strategies
Watershed Planning and Reporting
2,180,000
2,848,000
3,104,482
(668,000)
-23.5%
Climate Science
723,000
958,000
703,086
(235,000)
-24.5%
2,903,000
3,806,000
3,807,568
(903,000)
-23.7%
Water Risk Management
Water Resource Science
6,216,000
4,682,000
5,782,841
1,534,000
32.8%
Erosion Management
83,593,000
83,466,000
34,998,439
127,000
0.2%
Flood Management
5,593,000
5,463,000
4,971,661
130,000
2.4%
95,402,000
93,611,000
45,752,941
1,791,000
1.9%
Regional Biodiversity
Biodiversity Monitoring
2,701,000
2,670,000
2,368,274
31,000
1.2%
Ecosystem Management Research and Directions
1,168,000
935,000
770,771
233,000
24.9%
Forest Management
1,141,000
1,552,000
1,275,330
(411,000)
-26.5%
Restoration and Regeneration
11,444,000
17,092,000
11,936,733
(5,648,000)
-33.0%
16,454,000
22,249,000
16,351,108
(5,795,000)
-26.0%
Greenspace Securement and Management
Greenspace Securement
2,264,000
2,727,000
1,482,086
(463,000)
-17.0%
Greenspace Management
4,473,000
2,132,000
1,912,183
2,341,000
109.8%
Rental Properties
1,585,000
1,971,000
1,792,267
(386,000)
-19.6%
8,322,000
6,830,000
5,186,536
1,492,000
21.8%
Tourism and Recreation
Waterfront Parks
3,169,000
2,539,000
1,519,712
630,000
24.8%
Conservation Parks
5,573,000
6,146,000
6,251,249
(573,000)
-9.3%
Trails
11,494,000
6,951,000
3,614,302
4,543,000
65.4%
Bathurst Glen Golf Course
1,247,000
1,314,000
1,166,133
(67,000)
-5.1%
Black Creek Pioneer Village
4,404,000
4,924,000
4,437,219
(520,000)
-10.6%
Events and Festivals
607,000
647,000
615,565
(40,000)
-6.2%
Wedding and Corporate Events
-
-
-
-
0.0%
26,494,000
22,521,000
17,604,180
3,973,000
17.6%
Planning and Development Review
Development Planning and Regulation Permitting
6,629,000
6,543,000
5,932,258
86,000
1.3%
Environmental Assessment Planning and Permitting
3,865,000
3,982,000
3,119,989
(117,000)
-2.9%
Policy Development and Review
1,195,000
1,023,000
851,725
172,000
16.8%
11,689,000
11,548,000
9,903,972
141,000
1.2%
Education and Outreach
School Programs
11,628,000
14,083,000
8,426,043
(2,455,000)
-17.4%
Newcomer Services
1,011,000
885,000
860,014
126,000
14.2%
Family and Community Programs
1,134,000
1,299,000
1,067,158
(165,000)
-12.7%
13,773,000
16,267,000
10,353,215
(2,494,000)
-15.3%
Sustainable Communities
Living City Transition Program
6,496,000
7,241,000
5,477,800
(745,000)
-10.3%
Community Engagement
3,639,000
3,193,000
2,637,845
446,000
14.0%
Social Enterprise Development
-
-
-
-
0.0%
10,135,000
10,434,000
8,115,645
(299,000)
-2.9%
Corporate Services
Financial Management
3,802,000
3,019,000
2,965,654
783,000
25.9%
Corporate Management and Governance
38,297,000
22,837,000
8,320,799
15,460,000
67.7%
Human Resources
1,544,000
1,360,000
1,151,467
184,000
13.5%
Corporate Communications
2,030,000
1,811,000
1,913,575
219,000
12.1%
Information Infrastructure and Management
3,022,000
3,280,000
3,108,248
(258,000)
-7.9%
Project Recoveries
(3,941,000)
(5,495,000)
(3,251,181)
1,554,000
-28.3%
Vehicles and Equipment
(66,000)
(100,000)
(94,852)
34,000
-34.0%
44,688,000
26,712,000
14,113,710
17,976,000
67.3%
Total Expenditures
229,860,000
213,978,000
131,188,875
15,882,000
7.4%
Net Surplus (Deficit)
(21,660,000)
(9,825,000)
5,401,870
(11,835,000)
120.5%
Head Office Construction Loan/Reserves
23,729,000
13,855,000
(4,111,615)
9,874,000
71.3%
Net Budget
2,069,000
4,030,000
1,290,255
(1,961,000)
-48.7%
Toronto and Region Conservation Authority
2020 Operating Budget
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial
Federal
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
3
2020
Budget
2019
Budget
Unaudited
2019
Actual
$ Change
over2019
Budget
% Change
over2019
Budget
15,448,000
14,828,000
14,828,560
620,000
4.2%
392,000
392,000
389,703
-
0.0%
993,000
1,194,000
1,163,803
(201,000)
-16.8%
302,000
306,000
283,721
(4,000)
-1.3%
2,133,000
1,869,000
1,599,819
264,000
14.1%
826,000
382,000
439,490
444,000
116.2%
-
-
-
-
0.0%
21,486,000
22,621,000
19,999,766
(1,135,000)
-5.0%
-
-
-
-
0.0%
1,126,000
1,021,000
1,217,570
105,000
10.3%
3,344,000
3,726,000
4,121,535
(382,000)
-10.3%
78,000
-
4,171
78,000
0.0%
1,413,000
716,000
737,099
697,000
97.3%
725,000
711,000
851,177
14,000
2.0%
27,000
7,000
1,152,975
20,000
285.7%
48,293,000
47,773,000
46,789,389
520,000
1.1%
Toronto and Region Conservation Authority
2020 Operating Budget
FI
Unaudited $ Change % Change
2020 2019 2019 over 2019 over2019
Budget Budget Actual Budget Budget
Expenditures
Watershed Studies and Strategies
Watershed Planning and Reporting 665,000 1,581,000 1,623,537 (916,000) -57.9%
Climate Science - - - - 0.0%
665,000 1,581,000 1,623,537 (916,000) -57.9%
Water Risk Management
-
-
86,000
0.0%
5,178,000
Water Resource Science
-
-
-
-
0.0%
Erosion Management
-
-
-
-
0.0%
Flood Management
1,060,000
1,187,000
1,036,209
(127,000)
-10.7%
4.7%
1,060,000
1,187,000
1,036,209
(127,000)
-10.7%
Regional Biodiversity
-
-
34,000
0.0%
11,065,000
Biodiversity Monitoring
8,000
29,000
43,733
(21,000)
-72.4%
Ecosystem Management Research and Directions
-
-
-
-
0.0%
Forest Management
127,000
79,000
131,203
48,000
60.8%
Restoration and Regeneration
1,083,000
525,000
521,860
558,000
106.3%
1,218,000
633,000
696,796
585,000
92.4%
Greenspace Securement and Management
Greenspace Securement
-
-
-
-
0.0%
Greenspace Management
593,000
779,000
545,932
(186,000)
-23.9%
Rental Properties
1,585,000
1,971,000
1,792,267
(386,000)
-19.6%
2,178,000
2,750,000
2,338,199
(572,000)
-20.8%
Tourism and Recreation
Waterfront Parks
Conservation Parks
Trails
Bathurst Glen Golf Course
Black Creek Pioneer Village
Events and Festivals
Wedding and Corporate Events
Planning and Development Review
Development Planning and Regulation Permitting
Environmental Assessment Planning and Permitting
Policy Development and Review
Education and Outreach
School Programs
Newcomer Services
Family and Community Programs
Sustainable Communities
Living City Transition Program
Community Engagement
Social Enterprise Development
Corporate Services
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Total Expenditures
Net Surplus (Deficit)
Head Office Construction Loan/Reserves
-
-
-
86,000
0.0%
5,178,000
5,523,000
5,824,348
(345,000)
-6.2%
-
-
475
-
0.0%
1,247,000
1,314,000
1,166,133
(67,000)
-5.1%
4,033,000
4,232,000
3,976,517
(199,000)
4.7%
607,000
647,000
615,565
(40,000)
-6.2%
-
-
-
34,000
0.0%
11,065,000
11,716,000
11,583,038
(651,000)
-5.6%
6,629,000
6,543,000
5,932,258
86,000
1.3%
3,865,000
3,982,000
3,119,989
(117,000)
-2.9%
553,000
493,000
445,435
60,000
12.2%
11,047,000
11,018,000
9,497,682
29,000
0.3%
4,827,000
5,356,000
4,633,548
(529,000)
-9.9%
858,000
730,000
714,951
128,000
17.5%
1,046,000
1,011,000
944,548
35,000
3.5%
6,731,000
7,097,000
6,293,047
(366,000)
-5.2%
145,000 146,000
142,978
(1,000)
-0.7%
644,000 293,000
385,554
351,000
119.8%
- -
-
-
0.0%
789,000 439,000
528,532
350,000
79.7%
3,571,000
3,019,000
2,797,152
552,000
18.3%
5,943,000
5,830,000
5,350,011
113,000
1.9%
1,514,000
1,312,000
1,126,945
202,000
15.4%
2,030,000
1,811,000
1.,626,125
219,000
12.1%
2,454,000
2,608,000
2,607,213
(154,000)
-5.9%
(3,974,000)
(5,498,000)
(3,261,877)
1,524,000
-27.7%
(66,000)
(100,000)
(94,852)
34,000
-34.0%
11,472,000
8,982,000
10,150,717
2,490,000
27.7%
46,225,000
45,403,000
43,747,757
822,000
1.8%
2,070,000 2.370,000 3,041,631 (300,000) -12.7%
(80,000) 268,186 80,000 -100.0%
Net Budget 2,070,000 2,290,000 3,309,817 (220,000) -9.6%
Toronto and Region Conservation Authority
2020 Capital Budget
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial
Federal
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
6i
2020
Budget
2019
Budget
Unaudited
2019
Actual
$ Change
over 2019
Budget
% Change
over 2019
Budget
-
-
-
-
0.0%
59,500,000
59,033,000
43,754,970
467,000
0.8%
68,074,000
68,789,000
28,745,410
(715,000)
-1.0%
2,656,000
3,106,000
736,139
(450,000)
-14.5%
2,815,000
3,564,000
5,508,532
(749,000)
-21.0%
11,744,000
8,017,000
2,699,763
3,727,000
46.5%
-
-
-
-
0.0%
699,000
948,000
643,321
(249,000)
-26.3%
2,363,000
2,685,000
881,409
(322,000)
-12.0%
3,414,000
7,847,000
2,565,437
(4,433,000)
-56.5%
1,014,000
364,000
278,362
650,000
178.6%
2,643,000
1,259,000
1,338,314
1,384,000
109.9%
4,981,000
761,000
2,699,705
4,220,000
554.5%
5,000
5,000
(250,007)
-
0.0%
0.0%
159,908,000
156,378,000
89,801,355
3,530,000
2.3%
Toronto and Region Conservation Authority
2020 Capital Budget
Expenditures
Watershed Studies and Strategies
Watershed Planning and Reporting
Climate Science
Water Risk Management
Water Resource Science
Erosion Management
Flood Management
Regional Biodiversity
Biodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement and Management
Greenspace Securement
Greenspace Management
Tourism and Recreation
Waterfront Parks
Conservation Parks
Trails
Black Creek Pioneer Village
Events and Festivals
Planning and Development Review
Policy Development and Review
Education and Outreach
School Programs
Newcomer Services
Family and Community Programs
Sustainable Communities
Living City Transition Program
Community Engagement
Corporate Services
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Total Expenditures
Net Surplus (Deficit)
Head Office Construction Loan/Reserves
11
Unaudited $ Change % Change
2020 2019 2019 over 2019 over2019
Budget Budget Actual Budget Budget
1,515,000 1,267,000 1,480,945 248,000 19.6%
723,000 958,000 703,086 (235,000) -24.5%
2,238,000 2,225,000 2,184,031 13,000 0.6
6,216,000
4,682,000
5,782,841
1,534,000
32.8%
83,593,000
83,466,000
34,998,439
127,000
0.2%
4,533,000
4,275,000
3,935,452
258,000
6.0%
94,342,000
92,423,000
44,716,732
1,919,000
2.1%
2,694,000
2,640,000
2,324,541
54,000
2.0%
1,168,000
935,000
770,771
233,000
24.9%
1,013,000
1,473,000
1,144,128
(460,000)
-31.2%
10,361,000
16,567,000
11,414,873
(6,206,000)
-37.5%
15,236,000
21,615,000
15,654,313
(6,379,000)
-29.5%
2,264,000 2,727,000 1,482,086 (463,000) -17.0%
3,880,000 1,352,000 1,366,251 2,528,000 187.0%
6,144,000 4,079,000 2,848,337 2,065,000 50.6%
3,169,000
2,539,000
1,519,712
630,000
24.8%
395,000
623,000
426,901
(228,000)
-36.6%
11,494,000
6,951,000
3,613,827
4,543,000
65.4%
371,000
692,000
460,703
(321,000)
-46.4%
-
-
-
-
0.0
15,429,000
10,805,000
6,021,143
4,624,000
42.8%
641,000 530,000 406,290 111,000 20.9%
641,000 530,000 406,290 111,000 20.9%
6,802,000
8,727,000
3,792,495
(1,925,000)
-22.1%
153,000
155,000
145,063
(2,000)
-1.3%
88,000
288,000
122,610
(200,000)
-69.4%
7,043,000
9,170,000
4,060,168
(2,127,000)
-23.2%
6,352,000
7,095,000
5,334,822
(743,000)
-10.5%
2,995,000
2,900,000
2,252,292
95,000
3.3%
9,347,000
9,995,000
7,587,114
(648,000)
-6.5%
231,000
-
168,502
231,000
0.0%
32,353,000
17,007,000
2,970,788
15,346,000
90.2%
30,000
48,000
24,522
(18,000)
-37.5%
-
-
287,450
-
0.0%
568,000
672,000
501,034
(104,000)
-15.5%
33,000
4,000
10,696
29,000
725.0%
-
-
-
-
0.0%
33,215,000
17,731,000
3,962,992
15,484,000
87.3%
183,635,000
168,573,000
87,441,120
15,062,000
8.9%
(23,728,000) (12,195,000) 2,360,240 (11,533,000) 94.6%
23,729,000 13,935,000 (4,379,801) 9,794,000 70.3%
Net Budget 1,000 1,740,000 (2,019,561) (1,739,000) -99.9%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Watershed Studies and Strategies - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
7
665,000
1,457,000
Unaudited
$Change
%Change
2020
2019
2019
over 2019
over 2019
Budget
Budget
Actual
Budget
Budget
665,000
1,457,000
1,456,900
(792,000)
-54.4%
1,184,000
1,854,000
1,283,927
(670,000)
-36.1%
190,000
204,000
69,487
(14,000)
-6.9%
136,000
-
(100,000)
136,000
0.0%
250,000
175,000
91,235
75,000
42.9%
435,000
135,000
243,193
300,000
222.2%
-
-
-
-
0.0 %
-
24,000
375.
(24,000)
-100.0%
-
-
-
-
0.0%
40,000
-
15,000
40,000
a0%
-
-
-
-
0.0%
-
7,000
-
(7,000)
-100.0%
3,000
-
796,051
3,000
0.0%
-
-
-
0.0%
-
-
-
-
0.0%
2,903,000
3,856,000
3,856,168
(953,000)
-24.7%
1,720,000
2,930,000
3,244,785
(1,210,000)
-41.3%
557,000
595,000
400,708
(38,000)
-6.4%
15,000
45,000
18,688
(30,000)
-66.7%
-
-
-
0.0%
0.0%
2,292,000
3,570,000
3,664,181
(1,278,000)
-35.8%
-
(148,000)
(1,008)
148,000
-100.0%
611,000
385,000
144,394
226,000
58.7%
2,903,000
3,807,000
3,807,567
(904,000)
-23.7%
49,000
48,601
(49,000)
-100.0%
- (15.671) - 0.0%
49,000 32,930 (49,000) -100.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Water Risk Management - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Ll
$ Change % Change
over2019 over2019
Budget Budget Actual Budget Budget
664,000
861,000
860,600
(197,000)
-22.9%
21,186,000
22,365,000
19,263,035
(1,179,000)
-5.3%
60,504,000
60,139,000
21,012,790
365,000
0.6%
352,000
-
183,115
352,000
0.0%
2,554,000
2,183,000
2,885,168
371,000
17.0%
9,111,000
6,761,000
1,257,998
2,350,000
34.8%
-
-
-
-
0.0%
92,000
64,000
42,252
28,000
43.8%
60,000
21,000
8,424
39,000
185.7%
1,082,000
1,353,000
1,180,938
(271,000)
-20.0%
-
-
-
0.0%
1,000 1,000 - -
0.0%
- - - -
0.0%
5,000 5,000 7,325 -
0.0%
64,420,000
0.0%
95,611,000 93,753,000 46,701,645 1,858,000
2.0%
14,112,000
10,736,000
12,061,158
3,376,000
31.4%
62,411,000
64,420,000
26,798,484
(2,009,000)
-3.1%
16,645,000
14,053,000
3,392,792
2,592,000
18.4%
26,000
28,000
30,172
(2,000)
-7.1%
18,000
(18,000)
-100.0%
93,194,000
89,255,000
42,282,606
3,939,000
4.4%
(543,000) (12,661,000) (1,737,350) 12,118,000 -95.7%
2,751,000 17,016,000 5,207,684 (14,265,000) -83.8%
95,402,000 93,610,000 45,752,940 1,792,000 1.9%
209,000 143,000 948,705 66,000 46.2%
(316,983)
0.0%
209,000 143,000 631,722 66,000 46.2%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Regional Biodiversity - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
-
27,000
27,000
7,798,000
9,404,000
7,278,782
2,148,000
2,895,000
5,722,082
281,000
453,000
168,984
266,000
764,000
589,180
1,016,000
541,000
438,658
29,000
39,000
45,419
2,085,000
2,430,000
868,719
1,659,000
5,582,000
1,151,178
7,000
-
20,250
9
$ Change % Change
over2019 over2019
Budget Budget
(27,000)
-100.0%
(1,606,000)
-17.1%
(747,000)
-25.8%
(172,000)
-38.0%
(498,000)
-65.2%
475,000
87.8%
-
0.0%
(10,000)
-25.6%
(345,000)
-14.2%
(3,923,000)
-70.3%
5,763
0.0%
550,000 - 6,240 550,000
0.0%
540,000 75,000 986,829 465,000
620.0%
- - - -
0.0%
- - -
0.0%
16,372,000 22,210,000 17,303,321 (5,838,000)
-26.3%
13,957,000
14,127,000
8,943,306
(170,000)
-1.2%
(864,000)
3,342,000
4,154,035
(4,196,000)
-125.6%
2,424,000
3,159,000
1,996,562
(735,000)
-23.3%
5,000
3,000
5,763
2,000
66.7%
8,000
1,000
6,331
7,000
700.0%
15,540,000
20,632,000
15,105,997
(5.092,000)
-24.7%
(5,438,000) (4,033,000) (5,252,800) (1,405,000) 34.8%
6,353,000 5,650,000 6,497,912 703,000 12.4%
16,455,000 22,249,000 16,351,109 (5,794,000) -26.0%
(83,000) (39,000) 952,212 (44,000) 112.8%
(100,000) (652,471) - 0.0%
(83,000) (139.000) 299,741 (44.000) 31.7%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Greenspace Securement and Management - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
-
1,095,000
1.,095,200
3,068,000
1,326,000
831,887
174,000
198,000
24,540
54,000
1,277,000
203,637
1,000
5,000
4,400
10,000
120,000
260,170
-
-
4,625
87,000
99,000
46
75,000
180,000
61,410
4,080,000
3,832,000
4,003,897
10
$ Change % Change
over2019 over 2019
Budget Budget
(1,095,000)
-100.0%
1,742,000
131.4%
(24,000)
-12.1%
(1,223,000)
-95.8%
(4,000)
-80.0%
(110,000)
-91.7%
6,000
0.0%
(1,000)
0.0%
(12,000)
-12.1%
(105,000)
-58.3%
248,000
6.5%
1,900,000
1,000,000 1,175,000
900,000
90.0%
-
- 470,791
-
0.0%
-
- (257,332)
-
0.0%
6,000
7,000 6,565
(1,000)
-14.3%
9,455,000
9,139,000 7,884,836
316,000
3.5%
1,615,000
2,068,000
1,585,813
(453,000)
-21.9%
3,234,000
1,573,000
1,138,197
1,661,000
105.6%
2,082,000
2,504,000
1,302,446
(422,000)
-16.9%
55,000
67,000
107,468
(12,000)
-17.9%
617,000
775,000
674,321
(158,000)
-20.4%
7,603,000
6,987,000
4,808,245
616,000
8.8%
(163,000) (790,000) (378,818) 627,000 -79.4%
882,000 631,000 757,110 251,000 39.8%
8,322,000 6,828,000 5,186,537 1,494,000 21.9%
1,133,000 2,311,000 2,698,299 (1,178,000) -51.0%
- - - 0.0%
1.133,000 2,311,000 2,698.299 (1,178,000) -51.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Tourism and Recreation - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
864,000
1,507,000
1,506,300
4,793,000
5,441,000
4,075,779
4,262,000
5,001,000
1,688,477
1,799,000
1,405,000
143,807
451,000
408,000
419,285
272,000
10,000
243,481
9,195,000
9,564,000
9,283,627
98,000
102,000
3,892
186,000
84,000
162,085
215,000
195,000
386,833
11
$ Change % Change
over 2019 over 2019
Budget Budget
(643,000)
-42.7%
(648,000)
-11.9%
(739,000)
-14.8%
394,000
28.0%
43,000
10.5%
262,000
2620.0%
-
0.0%
(369,000)
-3.9%
(4,000)
-3.9%
102,000
121.4%
20,000
10.3%
- - 667 -
0.0%
4,359,000 571,000 65,705 3,788,000
663.4%
- - (351) -
0.0%
- - - -
0.0%
26,494,000 24,288,000 17,979,587 2,206,000
9.1%
11,274,000
10,103,000
9,521,662
1,171,000
11.6%
9,036,000
8,334,000
3,944,221
702,000
8.4%
2,332,000
2,123,000
1,727,897
209,000
9A%
626,000
685,000
803,818
(59,000)
-8.6%
455
0.0%
23,268,000
21,245,000
15,998,053
2,023,000
9.5%
(10,000) (825,000) (137,950) 815,000 -98.8%
3,234,000 2,102,000 1,744,078 1,132,000 53.9%
26,492,000 22,522,000 17,604,181 3,970.000 17.6%
2,000 1,766,000 375,406 (1,764,000) -99.9%
(2,853,424) - 0.0%
2,000 1.766,000 (2,478,018) (1.764,000) -99.9%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Planning and Development Review - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
12
935,000
-
Unaudited
$Change
%Change
2020
2019
2019
over2019
over 2019
Budget
Budget
Actual
Budget
Budget
935,000
-
-
935,000
0.0%
1,033,000
922,000
798,290
111,000
12.0%
839,000
969,000
938,332
(130,000)
-13.4%
-
1,000
-
(1,000)
-100.0%
477,000
440,000
397,733
37,000
8.4%
-
-
-
-
0.0%
-
-
-
0.0%
8,295,000
9,284,000
7,279,646
(989,000)
-10.7%
-
-
-
0.0%
109,000
156,000
139,895
(47,000)
-30.1%
-
-
-
-
0.0%
-
-
0.0%
_
_
OA%
-
-
0.0%
-
-
-
-
0.0%
11,688,000
11,772,000
9,553,896
(84,000)
-0.7%
10,606,000
10,414,000
9,145,920
192,000
1.8%
652,000
730,000
356,037
(78,000)
-10.7%
115,000
97,000
127,160
18;000
18.6%
-
-
-
-
0.0%
0.0%
11,373,000
11,241,000
9,629,117
132,000
1.2%
- -
-
-
0.0%
316,000 307,000
274,855
9,000
2.9%
11,689,000 11,548,000
9,903,972
141,000
1.2%
(1,000) 224,000
(350,076)
(225,000)
-100.4%
0,0%
Net Budget (1,000) 224.000 (350,076) (225,000) -100.4%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Education and Outreach - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
13
$ Change % Change
over 2019 over 2019
Budget Budget
1,679,000
2,231,000
2,230,700
(552,000)
-24.7%
6,188,000
8,457,000
3,447,407
(2,269,000)
-26.8%
-
3,000
1,800
(3,000)
-100.0%
89,000
-
-
89,000
0.0%
804,000
699,000
429,952
105,000
15.0%
451,000
407,000
462,014
44,000
10.8%
-
-
-
-
0.0%
3,843,000
3,645,000
3,339,891
198,000
5.4%
-
-
-
-
0.0%
306,000
276,000
145,819
30,000
10.9%
29,000
28,000
(41,760)
1,000
3.6%
25,000
2,000
22,934
23,000
1150.0%
359,000
498,000
328,740
(139,000)
-27.9%
-
-
2,725
-
0.0%
-
-
-
0.0%
13,773,000
16,246,000
10,370,222
(2,473,000)
-15.2%
7,016,000
7,155,000
6,748,453
(139,000)
-1.9%
5,780,000
7,727,000
2,763,681
(1,947,000)
-25.2%
618,000
653,000
493,779
(35,000)
-5,4%
218,000
229,000
212,468
(11,000)
4.8%
0.0%
13,632,000
15,764,000
10,218,381
(2,132,000)
-13.5%
(690,000)
(758,000)
(760,137)
68,000
-9.0%
832,000
1,261,000
894,972
(429,000)
-34.0%
13,774,000
16,267,000
10,353,216
(2,493,000)
-15.3%
(1,000)
(21,000)
17,006
20,000
-95.2%
20,000 249,297 - 0.0%
(1,000) (1,000) 266,303 20,000 -2000.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Sustainable Communities - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefts
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
14
$ Change % Change
over2019 over 2019
Budget Budget
155,000
128,000
127,600
27,000
21.1%
6,436,000
5,913,000
4,846,486
523,000
8.8%
916,000
573,000
250,076
343,000
59.9%
26,000
36,000
90,097
(10,000)
-27.8%
80,000
678,000
486,175
(598,000)
-88.2%
141,000
412,000
224,353
(271,000)
-65.8%
-
-
-
418,000
0.0%
646,000
862,000
734,790
(216,000)
-25.1%
33,000
33,000
327
-
0.0%
980,000
1,230,000
890,377
(250,000)
-20.3%
-
-
-
(1,000)
0.0%
245,000
249,000
137,374
(4,000)
-1.6%
478,000
320,000
417,162
158,000
49.4%
-
-
-
-
0.0%
-
-
-
0.0%
10,136,000
10,434,000
8,204,817
(298,000)
-2.9%
6,283,000
6,182,000
5,902,391
101,000
1.6%
2,577,000
2,761,000
1,175,676
(184,000)
-6.7%
320,000
322,000
196,997
(2,000)
-0.6%
-
-
472
-
0.0%
0.0%
9,180,000
9,265,000
7,275,536
(85,000)
-0.9%
(277,000)
(695,000)
(635,621)
418,000
-60.1%
1,232,000
1,862,000
1,475,730
(630,000)
-33.8%
10,135,000
10,432,000
8,115,645
(297,000)
-2.8%
1,000
2,000
89,172
(1,000)
-50.0%
- - (150,349) - 0.0%-
1,000 2.000 (61,177) (1,000) -50.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Corporate Services - by object classification
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Total Expenditures
Net Surplus (Deficit)
Head Office Construction Loan/Reserves
15
2020
Budget
2019
Budget
Unaudited
2019
Actual
$ Change
over 2019
Budget
% Change
over 2019
Budget
10,487,000
7,523,000
7,524,260
2,964,000
39.4%
8,205,000
3,744,000
2,319,080
4,461,000
119.2%
33,000
-
201,628
33,000
0.0%
222,000
240,000
330,221
(18,000)
-7.5%
66,000
80,000
1,805,224
(14,000)
-17.5%
1.,135,000
13,000
9,387
1,122,000
8630.8%
-
-
-
-
0.0%
85,000
85,000
112,463
-
0.0%
-
-
-
-
0.0%
104,000
7,000
36,305
97,000
1385.7%
34,000
34,000
30,677
-
0.0%
-
-
270
-
0.0%
655,000
14,000
371,525
641,000
4578.6%
725,000
711,000
848,804
14,000
2.0%
22,000
-
1,146,410
22,000
100.0%
21,773,000
12,451,000
14,736,254
9,322,000
74.9%
13,067,000
12,229,000
11,819,623
838,000
6.9%
37,532,000
21,303,000
8,508,235
16,229,000
76.2%
2,884,000
2,412,000
1,793,102
472,000
19.6%
65,000
67,000
81,992
(2,000)
-3.0%
229,000
6,000
5,045
223,000
3716.7%
53,777,000
36,017,000
22,207,997
17,760,000
49.3%
(9,491,000) (10,049,000) (9,043,983) 558,000 -5.6%
402,000 743,000 949,696 (341,000) -45.9%
44,688,000 26,711,000 14,113,710 17,977,000 67.3%
(22,915,000) (14,260,000) 622,544 (8,655,000) 60.7%
23,729,000 13.935,000 (372,013) 9,794,000 70.3%
Net Budget 814,000 (325,000) 250,531 1.139,000 -350.5%
Toronto and Region Conservation Authority
2020 Operating and Capital Levy
($000s)
Service Area
Watershed Studies and Strategies
Water Risk Management
Regional Biodiversity
Greenspace Securement and Management
Tourism and Recreation
Planning and Development Review
Education and Outreach
Sustainable Communities
Corporate Services
Apportionment of 2020 General Levy
Capital Levy
Durham
Peel
Toronto
11
550
252
358
2,362
12,159
436
4,080
1,833
3
1,507
64
106
1,077
4,507
14
447
321
-
1,803
147
104
3,370
1,100
82
1,923
4,442
1,114
17,119
24,825
Apportionment of 2020 General Levy
16
Operating
Matching
York
Levy
Total
198
665
1,676
1,894
664
17,437
1,094
-
7,443
165
-
1,739
244
864
6,798
110
935
1,827
184
1,678
3,812
469
155
5,198
635
10,487
17,569
4,993
15,448
63,499
16
Matching
Non
2020
2019
Matching
Non
Tax
CVA
General
General
$Change
%Change
Levy
Levy
Adujstment
Levy
Levy
Levy
over2019
over 2019
Township of Adjala-Tosorontio
25
905
-
-
930
885
45
5.1%
Regional Municipality of Durham
11,266
404,153
100,326
80,255
596,000
581,850
14,150
2.4%
City of Toronto
256,700
9,209,032
4,680
-
9,470,412
8,908,335
562,077
6.3%
Town of Mono
32
1,172
496
-
1,700
1,480
220
14.9%
Regional Municipality of Peel
44,126
1,582,988
46,829
246,412
1,920,355
1,917,000
3,355
0.2%
Regional Municipality of York
87,542
3,140,554
185,281
45,113
3,458,490
3,418,630
39,860
1.2%
399,691
14,338,804
337,612
371,780
15,447,887
14,828,180
619,707
4.2%
17
Toronto and Region Conservation Authority
2020 Basis of Apportionment - Municipal Levy
($000s)
Municipality
Current Value
Assessment'
Of
Municipality
in Authority
Current Value
Assessment
in Jurisdiction
Total
Population
Population
in Authority
Township of Adjala-Tosorontio
2,214
4
89
9,245
370
Durham, Regional Municipality of
47,611
39,522
193,761
161,646
City of Toronto
900,553
100
900,553
2,190,133
2,190,133
Town of Mono
2,264
5
113
7,570
379
Peel, Regional Municipality of
347,561
154,800
1,065,891
492,407
York, Regional Municipality of
338,019
307,115
762,455
684,284
1,638,222
1,402,192
4,229,055
3,529,219
Analysis of Rational Municipalities'
Durham, Regional Municipality of
Ajax, Town of
21,238
85
18,265
95,480
82,113
Pickering, Town of
21,376
95
20,307
80,079
76,075
Uxbridge Township
4,997
19
950
18,202
3,458
47,611
39,522
193,761
161,646
Peel, Regional Municipality of
Brampton, City
118,793
63
74,840
425,729
268,209
Mississauga, City of
208,462
55
11,168
581,325
191,837
Caledon, Town of
20,306
33
68,792
58,837
32,360
347,561
154,800
1,065,891
492,407
York, Regional Municipality of
Aurora, Town of
17,977
4
719
46,499
1,860
Markham, Town of
108,830
100
108,829
253,350
253,350
Richmond Hill, Town of
67,456
99
66,781
148,973
147,483
Vaughan, Town of
120,666
100
120,666
256,661
256,661
Whitchurch-Stouffville, Town of
13,554
43
5,829
35,391
15,218
King Township
9,536
45
4,291
21,581
9,711
338,019
307,115
762,455
684,283
As provided by the Ministry of Natural Resouces and Forestry
Toronto and Region Conservation Authority
2020 Operating and Capital Budget
Full-time Equivalent Employees (FTEs)
2020
2019
Watershed Studies and Strategies
Water Risk Management
Regional Biodiversity
Greenspace Securement and Management
Tourism and Recreation
Planning and Development Review
Education and Outreach
Sustainable Communities
Corporate Services
Watershed Studies and Strategies
Water Risk Management
Regional Biodiversity
Greenspace Securement and Management
Tourism and Recreation
Planning and Development Review
Education and Outreach
Sustainable Communities
Corporate Services
Operating Capital Total
4.25
9.83
14.08
7.45
146.65
154.10
15.43
155.11
170.54
8.17
9.14
17.31
122.61
43.64
166.25
92.64
2.75
95.39
72.45
15.84
88.29
3.10
61.78
64.88
103.90
19.45
123.35
430.00
464.19
894.19
11.27
13.55
24.82
8.40
106.4
114.84
15.44
167.20
182.64
10.45
11.37
21.82
127.84
23.56
151.40
89.62
2.40
92.02
76.75
13.75
90.50
2.68
62.56
65.24
101.78
13.20
114.98
444.23
414.03
858.26
W
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Watershed Studies and Strategies
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Watershed Planning and Reporting
Watershed Plans and Strategies
Report Cards
Climate Science
Emerging and Integrative Climate Science
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
19
2020
Budget
2019
Budget
Unaudited
2019
Actual
$Change
over 2019
Budget
%Change
over 2019
Budget
665,000
1,457,000
1,456,900
(792,000)
-54.4%
1,184,000
1,854,000
1,283,927
(670,000)
-36.1%
190,000
204,000
69,487
(14,000)
-6.9%
136,000
-
(100,000)
136,000
0.0%
250,000
175,000
91,235
75,000
42.9%
435,000
135,000
243,193
300,000
222.2%
-
-
-
-
0.0%
-
24,000
375
(24,000)
-100.0%
-
-
-
-
0.0%
40,000
-
15,000
40,000
0.0%
-
-
-
-
0.0%
-
7,000
-
(7,000)
-100.0%
3.000
-
796,051
3,000
0.0%
-
-
-
0.0%
2,903,000
3,856,000
3,856,168
(953,000)
-24.7%
1,892,000 2,605,000 2,975,728 (713,000) -27.4%
288,000 243,000 128,754 45,000 18.5%
2,180,000 2,848,000 3,104,482 (668,000) -23.5%
723,000 958,000 703,086 (235,000) -24.5%
723,000 958,000 703,086 (235,000) -24.5%
2,903,000 3,806,000 3,807,568 (903,000) -23.7%
50,000 48,600 (50,000) A00.0%
(15,671) - 0.0%
50,000 32.929 (50,000) -100.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Water Risk Management
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Water Resource Science
Groundwater Strategies
Source Water Protection Strategy
Regional Monitoring - Water
Hydrology
Stormwater Management Strategies
Flood Plain Mapping
Erasion Management
Capital Works
Hazard Monitoring
Flood Management
Flood Forecasting and Warning
Flood Risk Management
Flood Infrastructure and Operations
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
664,000
861,000
860,600
21,186,000
22,365,000
19,263,035
60,504,000
60,139,000
21,012,790
352,000
-
183,115
2,554,000
2,183,000
2,885,168
9,111,000
6,761,000
1,257,998
92,000
64,000
42,252
60,000
21,000
8,424
1,082,000
1,353,000
1,180,938
20
$ Change % Change
over 2019 over 2019
Budget Budget
(197,000)
-22.9%
(1,179,000)
-5.3%
365,000
0.6%
352,000
0.0%
371,000
17.0%
2,350,000
34.8%
-
0.0%
28,000
43.8%
39,000
185.7%
(271,000)
-20.0%
3,735,000
0.0%
1,000 1,000 - - 0.0%
- - - 0.0%
5,000 5,000 7,325 - 0.0%
95,611,000 93,753,000 46,701,645 1,858,000 2.0%
702,000
749,000
733,975
(47,000)
-6.3%
557,000
507,000
437,528
50,000
9.9%
732,000
487,000
469,050
245,000
50.3%
56,000
130,000
11,704
(74,000)
-56.9%
3,735,000
1,877,000
3,395,980
1,858,000
99.0%
435,000
932,000
734,603
(497,000)
-53.3%
6,217,000
4,682,000
5,782,840
1,535,000
32.8%
81,574,000 81,717,000 34,438,560 (143,000) -0.2%
2,019,000 1,749,000 559,879 270,000 15.4%
83,593,000 83,466,000 34,998,439 127,000 0.2%
713,000
829,000
612,769
(116,000)
-14.0%
3,302,000
3,053,000
3,085,295
249,000
8.2%
1,578,000
1,581,000
1,273,597
(3,000)
-0.2%
5,593,000
5,463,000
4,971,661
130,000
2.4%
95,403,000
93,811,000
45,752,940
1,792,000
1.9%
209,000 143,000 948,704 66,000 46.2%
(316,983) - 0.0%
209,000 143,000 631,721 66,000 46.2%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Regional Biodiversity
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Biodiversity Monitoring
Unaudited
2020 2019 2019
Budget Budget Actual
-
27,000
27,000
7,798,000
9,404,000
7,278,782
2,148,000
2,896,000
5,722,082
281,000
453,000
168,984
266,000
764,000
589,180
1,016,000
541,000
438,658
29,000
39,000
45,419
2,085,000
2,430,000
868,719
1,659,000
5,582,000
1,151,178
-
-
20,250
550,000
-
6,240
540,000
75,000
986,829
21
$ Change % Change
over 2019 over 2019
Budget Budget
(27,000)
-100.0%
(1,606,000)
-17.1%
(748,000)
-25.8%
(172,000)
-38.0%
(498,000)
-65.2%
475,000
87.8%
-
0.0%
(10,000)
-25.6%
(345,000)
-14.2%
(3,923,000)
-70.3%
-
0.0%
550,000
0.0%
465,000
620.0%
-
0.0%
16,372,000 22,211,000 17,303,321 (5,839,000) -26.3%
Regional Monitoring - Biodiversity
1,241,000
1,286,000
1,026,701
(45,000)
-3.5%
Activity Based Monitoring
794,000
580,000
605,189
214,000
36.9%
Terrestrial Inventory and Assessment
479,000
433,000
442,974
46,000
10.6%
Waterfront Monitoring
187,000
371,000
293,410
(184,000)
-49.6%
-6.6%
2,701,000
2,670,000
2,368,274
31,000
1.2%
Ecosystem Management Research and Directions
3,510,000
2,319;655
(2,091,000)
-59.6%
249,000
Aquatic System Priority Planning
515,000
446,000
326,430
69,000
15.5%
Terrestrial (and integrated) Ecosystem Management
646,000
481,000
424,005
165,000
34.3%
Natural Channel Design
-
-
-
-
0.0%
Restoration Opportunities Bank
7,000
8,000
20,336
(1,000)
-12.5%
1,168,000
935,000
770,771
233,000
24.9%
Forest Management
Managed Forest Tax Incentive Planning
17,000
12,000
11,072
5,000
41.7%
Hazard Tree Management
556,000
904,000
633,252
(348,000)
-38.5%
Invasive Species Management
45,000
227,000
222,886
(182,000)
-80.2%
Forest Management Planning
37,000
25,000
38,639
12,000
48.0%
Forest Management Operations
487,000
384,000
369,481
103,000
26.8%
1,142,000
1,552,000
1,275,330
(410,000)
-26.4%
Restoration and Regeneration
Propagation and Sale of Plants
Inland and Lakefill Soil Management
Shoreline Restoration
Wetlands
Riparian and Flood Plain Restoration
Natural Channel and Stream Restoration
Terrestrial Planting
Wildlife Habitat Management
Compensation Restoration
Watershed Restoration
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
100,000
105,000
60,349
(5,000)
-4.8%
361,000
287,000
330,914
74,000
25.8%
1,093,000
1,105,000
1,660,815
(12,000)
-1.1%
1,174,000
1,135,000
3,235,819
39,000
3.4%
496,000
531,000
509,241
(35,000)
-6.6%
2,683,000
1,418,000
1,118,360
1,265,000
89.2%
1,419,000
3,510,000
2,319;655
(2,091,000)
-59.6%
249,000
222,000
240,964
27,000
12.2%
1,779,000
2,129,000
646,233
(350,000)
-16.4%
2,091,000
6,650,000
1,814,382
(4,559,000)
-68.6%
11,445,000
17,092,000
11,936,732
(5,647,000)
-33.0%
16,456,000
22,249,000
16,351,107
(5,793,000)
-26.0%
(82,000) (38,000) 952,212 (44,000) 115.8%
(100,000) (652,471) 100,000 -100.0%
(82,000) (138,000) 299,741 56,000 -40.6%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Greenspace Securement and Management
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Greenspace Securement
Greenspace Land Acqusition
Greenspace Planning
Greenspace Management
Archaeology
Property Taxes and Insurance
Resource Management Planning
Inventory and Audit
Implementation
Hazard Management
Rental Properties
Rentals
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
Unaudited
2020 2019 2019
Budget Budget Actual
-
1,095,000
1,095,200
3,068,000
1,326,000
831,887
174,000
199,000
24,540
54,000
1,277,000
203,637
1,000
5,000
4,400
10,000
120,000
260,170
-
-
4,625
87,000
99,000
46
75,000
180,000
61,410
4,080,000
3,832,000
4,003,897
22
$ Change % Change
over2019 over 2019
Budget Budget
(1,095,000)
-100.0%
1,742,000
131.4%
(25,000)
-12.6%
(1,223,000)
-95.8%
(4,000)
-80.0%
(110,000)
-91.7%
6,000 7,000
0.0%
(1,000)
0.0%
(12,000)
-12.1%
(105,000)
-58.3%
248,000
6.5%
1,900,000 1,000,000
2,264,000
1,175,000
900,000
90.0%
- -
470,791
-
0.0%
- -
(257,332)
-
0.0%
6,000 7,000
6,565
(1,000)
736,000
9,455,000 9,140,000
7,884,836
315,000
.4%
3.4F/.-
2,264,000 2,727,000 1,480,855 (463,000) -17.0%
- - 1,230 - 0.0%
2,264,000 2,727,000 1,482,085 (463,000) -17.0%
210,000
365,000
187,711
(155,000)
-42.5%
333,000
343,000
296,141
(10,000)
-2.9%
1,175,000
439,000
848,105
736,000
167.7%
-
131,000
124,296
(131,000)
-100.0%
2,713,000
820,000
423,098
1,893,000
230.9%
42,000
33,000
32,832
9,000
27.3%
4,473,000
2,131,000
1,912,183
2,342,000
109.9%
1,585,000 1,971,000 1,792,267 (386,000) -19.6%
1,585,000 1,971,000 1,792;267 (386,000) -19.6%
8,322,000 6,829,000 5,186,535 1,493,000 21.9%
1,133,000 2,311,000 2,698,300 (1,178,000)
-51.0%
0.0%
1,133,000 2,311,000 2,698,300 (1,178,000) -51.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Tourism and Recreation
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Waterfront Parks
General Maintenance
Park Planning
Arsenal Lands
Park Development
Conservation Parks
Day Use
Picnics
Swimming
Fishing
Mountain Biking
Camping
Cross Country Skiing
Filming
Park Development
Trails
Trail Development
Trail Management
Trail Planning
TRCA Trail Strategy
Bathurst Glen Golf Course
Golf Course
Black Creek Pioneer Village
Heritage Village
Events and Festivals
Kortright
Black Creek Pioneer Village
Other Facilities
Wedding and Corporate Events
Kortright
Black Creek Pioneer Village
Other Facilities
Total Expenditures
Net Surplus (Deficit)
Reserves
Unaudited
2020 2019 2019
Budget Budget Actual
864,000
1,507,000
1,506,300
4,793,000
5,441,000
4,075,779
4,262,000
5,001,000
1,688,477
1,799,000
1,405,000
143,807
451,000
408,000
419,285
272,000
10,000
243,481
9,195,000
9,564,000
9,283,627
98,000
102,000
3,892
186,000
84,000
162,085
215,000
196,000
386,833
-
-
667
4,359,000
571,000
65,705
-
-
(351)
23
$ Change % Change
over2019 over2019
Budget Budget
(643.000) -42.7%
(648,000) -11.9%
(739.000) -14.8%
394.000 28.0%
43,000
10.5%
262,000
2620.0%
-
0.0%
(369,000)
-3.9%
(4,000)
-3.9%
102,000
121.4%
19.000
9.7%
- 0.0%
3,788,000 663.4%
- 0.0%
26,494,000 24,289,000 17,979,587 2,205,000 9.1%
284,000
284,000
1,320,496 -
0.0%
2,476,000
1,266,000
37,740 1,210,000
95.6%
-
-
- -
0.0%
409,000
990,000
161,476 (581,000)
-58.7%
3,169,000
2,540,000
1,519,712 629,000
24.8%
2,779,000
2,818,000
3,004,980
(39,000)
-1.4%
1,247,000
1,316,000
985,394
(69,000)
-5.2%
533,000
478,000
611,466
55,000
11.5%
19,000
15,000
14,497
4,000
26.7%
-
-
-
-
0.0%
932,000
1,453,000
1,553,861
(521,000)
-35.9%
58,000
42,000
68,327
16,000
38.1%
5,000
25,000
12,608
(20,000)
-80.0%
117
0.0%
5,573,000
6,147,000
6,251,250
(574,000)
-9.3%
9,534,000
6,459,000
3,080,949
3,075,000
47.6%
486,000
196,000
308,869
290,000
148.0%
1,473,000
296,000
224,484
1,177,000
397.6%
5,000
2.6%
608,000
0.0%
11,493,000
6,951,000
3,614,302
4,542,000
65.3%
1,247,000 1,314,000 1,166,133 (67,000) -5.1%
1,247,000 1,314,000 1,166,133 (67,000) -5.1%
4,404,000 4,924,000 4,437,219 (520,000) -10.6%
4,404,000 4,924,000 4,437,219 (520,000) -10.6%
184,000
207,000
174.490
(23,000)
-11.1%
226,000
247,000
223.555
(21,000)
-8.5%
198,000
193,000
217.520
5,000
2.6%
608,000
647,000
615,565
(39,000)
-6.0%
0.0%
0.0%
0.0%
0.0%
26,494,000 22,523,000 17,604,181 3,971,000 17.6%
1,000 1,768,000 375,407 (1,767,000) -99.9%
(2,853,424) 0.0%
Net Budget 1.000 1,768,000 (2,478017) (1,767000) -999%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Planning and Development Review
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Development Planning and Regulation Permitting
Planning
Permitting
Enquiries
Technical Services
Development Enforcement and Compliance
Environmental Assessment Planning and Permitting
Planning (Basic, Servicing Agreements, Master Plans)
Permitting
Development Enforcement and Compliance
Technical Services
Policy Development and Review
Policy
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
24
0.0%
0.0%
0.0%
11,688,000 11,772,000 9,553,896 (84,000) -0.7%
2,389,000
2,455,000
Unaudited
$Change
%Change
2020
2019
2019
over 2019
over 2019
Budget
Budget
Actual
Budget
Budget
1,890,000
1,760,000
1,818,331
130,000
7.4%
935,000
-
-
935,000
0.0%
1,033,000
922,000
798,290
111,000
12.0%
839,000
969,000
938,332
(130,000)
-13.4%
-
1,000
-
(1,000)
-100.0%
477,000
440,000
397,733
37,000
8.4%
-
-
-
-
0.0%
-
-
-
0.0%
8,295,000
9,284,000
7,279,646
(989,000)
-10.7%
-
-
-
0.0%
109,000
156,000
139,895
(47,000)
-30.1%
_
_
_
0.0%
0.0%
0.0%
0.0%
11,688,000 11,772,000 9,553,896 (84,000) -0.7%
2,389,000
2,455,000
2,085,003
(66,000)
-2.7%
1,797,000
1,781,000
1,425,726
16,000
0.9%
49,000
45,000
19,602
4,000
8.9%
1,890,000
1,760,000
1,818,331
130,000
7.4%
504,000
503,000
583,595
1,000
0.2%
6,629,000
6,544,000
5,932,257
85,000
1.3%
1,257,000
1,217,000
978,973
40,000
3.3%
1,018,000
1,105,000
963,624
(87,000)
-T9%
336,000
335,000
315,527
1,000
0.3%
1,254,000
1,325,000
861,865
(71,000)
-5.4%
3,865,000
3,982,000
3,119,989
(117,000)
-2.9%
1,195,000 1,023,000 851,725 172,000 16.8%
1,195,000 1,023,000 851,725 172,000 16.8%
11,689,000 11,549,000 9,903,971 140,000 1.2%
(1,000) 224,000 (350,076) (225,000) -100.4%
0.0%
(1,000) 224.000 (350,076) (225,000) -100.4%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Education and Outreach
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
School Programs
Early Leamers
Post Secondary
Elementary
Secondary
Newcomer Services
Development of Internationally Trained Professionals
Multicultural Connections Program
Family and Community Programs
Kortright
Bolton Camp Development
Other Locations
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
2020
Budget
2019
Budget
Unaudited
2019
Actual
$Change
over 2019
Budget
%Change
over 2019
Budget
1,679,000
2,231,000
2,230,700
(552,000)
-24.7
6,188,000
8,457,000
3,447,407
(2,269,000)
-26.8
-
3,000
1,800
(3,000)
-100.0
89,000
-
-
89,000
0.0%
804,000
699,000
429,952
105,000
15.0%
451,000
407,000
462,014
44,000
10.8%
-
-
-
-
0.0%
3,843,000
3,645,000
3,339,891
198,000
5.4%
-
-
-
-
0.0%
306,000
276,000
145,819
30,000
10.9%
29,000
28,000
(41,760)
1,000
3.6%
25,000
2,000
22,934
23,000
1150.0%
359,000
498,000
328,740
(139,000)
-27.9%
-
-
2,725
-
0.0%
13,773,000
16,246,000
10,370,222
(2,473,000)
-15.2%
484,000
721,000
643,144
(237,000)
-32.9%
5,000
46,000
65,000
84,975
(19,000)
-29.2%
149,000
5,959,000
6,074,000
5,361,015
(115,000)
-1.9%
1,067,158
5,139,000
7,223,000
2,336,909
(2,084,000)
-28.9%
(2,494,000)
11,628,000
14,083,000
8,426,043
(2,455,000)
-17.4%
858,000 730,000 714,951 128,000 17.5%
153,000 155,000 145,063 (2,000) -1.3%
1,011,000 885,000 860,014 126,000 14.2%
844,000
900,000
792,798
(56,000)
-6.2%
5,000
250,000
55
(245,000)
-98.0%
285,000
149,000
274,305
136,000
91.3%
1,134,000
1,299,000
1,067,158
(165,000)
-12.7%
13,773,000
16,267,000
10,353,215
(2,494,000)
-15.3%
(1,000) (21,000) 17,007 20,000 -95.2%
20,000 249,297 (20,000) -100.0%
(1,000) (1,000) 266,304
0.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Sustainable Communities
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Living City Transition Program
Sustainable Neighbourhood
Community Transformation
Partners in Project Green
Urban Agriculture
Sustainable Technology Evaluation Program
Climate Consortium
Green Infrastructure Ontario
Community Engagement
Citizen Based Regeneration
Stewardship
Watershed Engagement
Social Enterprise Development
Social Enterprise
Total Expenditures
Net Surplus (Deficit)
Reserves
Net Budget
C.
Unaudited $Change %Change
2020 2019 2019 over2019 over 2019
Budget Budget Actual Budget Budget
155,000
128,000
127,600
27,000
21.1%
6,436,000
5,913,000
4,846,486
523,000
8.8%
916,000
573,000
250,076
343,000
59.9%
26,000
36,000
90,097
(10,000)
-27.8%
80,000
678,000
486,175
(598,000)
-88.2%
141,000
412,000
224,353
(271,000)
-65.8%
-
-
-
64,000
0.0%
646,000
862,000
734,790
(216,000)
-25.1%
33,000
33,000
327
-
0.00/0
980,000
1,230,000
890,377
(250,000)
-20.3%
-
-
-
0.0%
245,000
249,000
137,374
(4,000)
-1.6%
478,000
320,000
417,162
158,000
49.4%
-
-
-
-
0.0%
10,136,000 10,434,000 8,204,817 (298,000) -2.99%
1,080,000
1,056,000
801,709
24,000
2.3%
718,000
1,130,000
682,416
(412,000)
-36.5%
1,170,000
1,585,000
855,913
(415,000)
-26.2%
287,000
325,000
195,912
(38,000)
-11.7%
2,006,000
2,214,000
2,148,708
(208,000)
-9.4%
813,000
573,000
590,223
240,000
41.9%
422,000
358,000
202,918
64,000
17.9%
6,496,000
7,241,000
5,477,799
(745,000)
-10.3%
1,771,000 1,838,000 1,536,959 (67,000) -3.6%
1,012,000 684,000 725,853 328,000 48.0%
856,000 671,000 375,034 185,000 27.6%
3,639,000 3,193,000 2,637,846 446,000 14.0%
0.0%
0.0%
10,135,000 10,434,000 8,115,645 (299,000) -2.9%
,000
1,000
89,172 1,000 0.0%
(150,349)
0.0%
(61,177) 1,000 0.0%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - Corporate Services
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial grants
Federal grants
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Sundry
Total Revenue
Expenditures
Financial Management
Accounting and Reporting
Business Planning and Strategic Management
Corporate Management and Governance
Corporate Secretariat
Corporate Sustainability Management
Support Services
Risk Management
Office of the CEO
Human Resources
Volunteers
Employee Support
Health and Safety
Human Capital Planning and Strategies
Corporate Communications
Communications
Digital and Social Media
Information Infrastructure and Management
Information Technology
Knowledge and Data Management
Business Software
Project Recoveries
Project Recoveries
Vehicles and Equipment
Operations
Acquisitions
Total Expenditures
Net Surplus (Deficit)
Head Office Construction Loan
27
2020
Budget
2019
Budget
Unaudited
2019
Actual
$Change
over 2019
Budget
%Change
over 2019
Budget
10,487,000
7,523,000
7,524,260
2,964,000
39.4%
8,205,000
3,744,000
2,319,079
4,461,000
119.2%
33,000
-
201,628
33,000
0.0%
222,000
240,000
330,221
(18,000)
-7.5%
66,000
80,000
1,805,224
(14,000)
-17.5%
1,135,000
13,000
9,387
1,122,000
8630.8%
-
-
-
-
0.0%
85,000
86,000
112,463
(1,000)
-1.2%
-
-
-
-
0.0%
104,000
7,000
36,305
97,000
1385.7%
34,000
34,000
30,677
-
0.0%
-
-
270
-
0.0%
655,000
14,000
371,525
641,000
4578.6%
725,000
711,000
848,804
14,000
2.0%
22,000
-
1,146,410
22,000
21,773,000
12,452,000
14,736,253
9,321,000
74.9%
2,237,000 2,233,000 2,261,897 4,000 0.2%
1,565,000 786,000 703,757 779,000 99.1%
3,802,000 3,019,000 2,965,654 783,000 25.9%
1,500,000
1,371,000
1,244,950
129,000
9.4%
-
-
143
-
0.0%
36,349,000
21,120,000
6,755,197
15,229,000
72.1%
-
-
-
-
0.0%
448,000
346,000
320,509
102,000
29.5%
38,297,000
22,837,000
8,320,799
15,460,000
67.7%
30,000
48,000
25,262
(18,000)
-37.5%
1,514,000
1,312,000
1,126,945
202,000
15.4%
-
-
(967)
-
a0%
-
-
227
-
0.0%
1,544,000
1,360,000
1,151,467
184,000
13.5%
1,733,000 1,754,000 1,851,568 (21,000) -1.2%
298,000 57,000 62,007 241,000 422.8%
2,031,000 1,811,000 1,913,575 220,000 12.1%
1,517,000
1,450,000 1,227,438
67,000
4.6%
1,233,000
1,830,000 1,652,571
(597,000)
-32.6%
272,000
- 228,238
272,000
0.0%
3,022,000
3,280,000 3,108,247
(258,000)
-7.9%
(3,941,000) (5,495,000) (3,251,181) 1,554,000 -28.3%
(3,941,000) (5,495,000) (3,251,181) 1,554,000 -28.3%
(1,264,000)
(1,205,000)
(939,337)
(59,000)
4.9%
1,198,000
1,105,000
844,485
93,000
8.4%
(66,000)
(100,000)
(94,852)
34,000
-34.0%
44,689,000
26,712,000
14,113,709
17,977,000
67.3%
(22,915,000) (14,259,000) 622,543 (8,656,000) 60.7%
23,729,000 13,935,000 (372,013) 9,794,000 70.3%
Net Budget 814,000 (324,000) 250,530 1,138,000 -351.2%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - excluding tangible capital asset expenditures
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Provincial/Federal
Provincial
Federal
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Net gain/loss on sale of tangible capital assets
Sundry
Total Revenue
Unaudited $ Change % Change
2020 2019 2019 over2019 over 2019
Budget Budget Actual Budget Budget
15,448,000
14,828,000
14,828,560
620,000
4.2%
59,892,000
59,425,000
44,149,673
467,000
0.8%
69,066,000
69,983,000
29,909,213
(917,000)
-1.3%
2,958,000
3,412,000
1,019,860
(454,000)
-13.3%
4,949,000
5,432,000
7,108,351
(483,000)
-8.9%.
12,570,000
8,400,000
3,139,254
4,170,000
49.6%
-
-
-
-
0.0%
22,185,000
23,569,000
20,843,087
(1,384,000)
-5.9%
2,363,000
2,685,000
881,409
(322,000)
-12.0%
4,540,000
8,868,000
3,783,007
(4,328,000)
-48.8%
4,358,000
4,089,000
4,399,897
269,000
6.6%
2,721,000
1,259,000
1,342,486
1,462,000
116.1%
6,394,000
1,477,000
3,436,804
4,917,000
332.9%
730,000
716,000
601,171
14,000
2.0%
-
-
-
-
0.0%
27,000
7,000
1,152,975
20,000
208,201,000
204,150,000
136,590,747
4,051,000
2.0%
ce
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - excluding tangible capital asset expenditures
Unaudited
$ Change
% Change
2020
2019
2019
over 2019
over 2019
Budget
Budget
Actual
Budget
Budget
Expenditures
Watershed Studies and Strategies
Watershed Planning and Reporting
2,185,000
2,848,000
3,104,482
(663,000)
-23.3
Climate Science
724,000
958,000
703,086
(234,000)
-24.4
2,909,000
3,806,000
3,807,568
(897,000)
-23.6%
Water Risk Management
Water Resource Science
6,222,000
4,682,000
5,782,841
1,540,000
32.9%
Erosion Management
85,196,000
83,466,000
34,998,439
1,730,000
2.1
Flood Management
5,834,000
5,463,000
4,971,661
371,000
6.8%
97,252,000
93,611,000
45,752,941
3,641,000
3.9%
Regional Biodiversity
Biodiversity Monitoring
2,775,000
2,670,000
2,368,274
105,000
3.9%
Ecosystem Management Research and Directions
1,170,000
935,000
770,771
235,000
25.1
Forest Management
1,143,000
1,552,000
1,275,330
(409,000)
-26.4%
Restoration and Regeneration
11,457,000
17,092,000
11,936,733
(5,635,000)
-33.0
16,545,000
22,249,000
16,351,108
(5,704,000)
-25.6%
Greenspace Securement and Management
Greenspace Securement
2,684,000
2,727,000
1,482,086
(43,000)
-1.6%
Greenspace Management
4,508,000
2,132,000
1,912,183
2,376,000
111.4%
Rental Properties
2,055,000
1,971,000
1,792,267
84,000
4.3%
9,247,000
6,830,000
5,186,536
2,417,000
35.4%
Tourism and Recreation
Waterfront Parks
4,365,000
2,539,000
1,519,712
1,826,000
71.9%
Conservation Parks
7,752,000
6,146,000
6,251,249
1,606,000
26.1
Trails
11,679,000
6,951,000
3,614,302
4,728,000
68.0%
Bathurst Glen Golf Course
1,250,000
1,314,000
1,166,133
(64,000)
-4.9%
Black Creek Pioneer Village
4,634,000
4,924,000
4,437,219
(290,000)
-5.9
Events and Festivals
615,000
647,000
615,565
(32,000)
-4.9%
Wedding and Corporate Events
1,000
-
-
1,000
0.0
30,296,000
22,521,000
17,604,180
7,775,000
34.5%
Planning and Development Review
Development Planning and Regulation Permitting
6,639,000
6,543,000
5,932,258
96,000
1.5%
Environmental Assessment Planning and Permitting
3,868,000
3,982,000
3,119,989
(114,000)
-2.9
Policy Development and Review
1,195,000
1,023,000
851,725
172,000
16.8%
11,702,000
11,548,000
9,903,972
154,000
1.3%
Education and Outreach
School Programs
11,933,000
14,083,000
8,426,043
(2,150,000)
-15.3%
Newcomer Services
1,013,000
885,000
860,014
128,000
14.5%
Family and Community Programs
1,134,000
1,299,000
1,067,158
(165,000)
-12.7%
14,080,000
16,267,000
10,353,215
(2,187,000)
-13.4%
Sustainable Communities
Living City Transition Program
6,684,000
7,241,000
5,477,800
(557,000)
-7.7
Community Engagement
3,640,000
3,193,000
2,637,845
447,000
14.0%
Social Enterprise Development
-
-
-
-
0.0
10,324,000
10,434,000
8,115,645
(110,000)
-1.1
Corporate Services
Financial Management
3,802,000
3,019,000
2,965,654
783,000
25.9%
Corporate Management and Governance
39,215,000
22,837,000
8,320,799
16,378,000
71.7
Human Resources
1,544,000
1,360,000
1,151,467
184,000
13.5
Corporate Communications
2,043,000
1,811,000
1,913,575
232,000
12.8%
Information Infrastructure and Management
3,119,000
3,280,000
3,108,248
(161,000)
-4.9%
Project Recoveries
(3,925,000)
(5,494,000)
(3,251,181)
1,569,000
-28.6%
Vehicles and Equipment
201,000
(100,000)
(94,852)
301,000
-301.0%
45,999,000
26,713,000
14,113,710
19,286,000
72.2%
Total Expenditures
238,354,000
213,979,000
131,188,875
24,375,000
11.4%
Net Surplus (Deficit)
(30,154,000)
(9,826,000)
5,401,870
(20,328,000)
206.9%
Head Office Construction Loan
23,729,000
13,855,000
(4,111,615)
9,874,000
71.3
Net Budget
(6,425,000)
4,029,000
1,290,255
(10,454,000)
-259.5%
Toronto and Region Conservation Authority
2020 Operating and Capital Budget - by object classification - excluding tangible capital asset expenditures
Revenue
Municipal
Operating levy
Capital levy
Contract services
Grants
Government
Provincial
Federal
Contract services
User fees, sales and admissions
Contract services
Compensation agreements
Corporate and other
Rent and property interests
Fundraising
Donations
Toronto and Region Conservation Foundation
Investment income
Net gain/loss on sale of tangible capital assets
Sundry
Total Revenue
Expenditures
Wages and benefits
Contracted services
Materials and supplies
Utilities
Property taxes
Internal Recoveries
Internal Charges
Add Amortization
Total Expenditures
Net Surplus (Deficit)
Head Office Construction Loan
Net Budget
2020 2019
Budget Budget
15,448,000
14,828,000
59,896,000
59,424,000
69,066,000
69,983,000
2,958,000
3,412,000
4,949,000
5,432,000
12,570,000
8,400,000
22,185,000
23,569,000
2,363,000
2,685,000
4,540,000
8,868,000
4,358,000
4,089,000
ce
Unaudited $ Change % Change
2019 over 2019 over 2019
Year to date Budget Budget
14,828,560
620,000
4.2%
44,144,671
472,000
0.8%
29,909,213
(917,000)
-1.3%
1,019,860
(454,000)
-13.3%
7,108,351
(483,000)
-8.9%
3,139,254
4,170,000
49.6%
-
-
0.0%
20,843,087
(1,384,000)
-5.9%
881,409
(322,000)
-12.0%
3,783,007
(4,328,000)
48.8%
4,399,897
269,000
6.6%
2,721,000
1,259,000
1,342,486
1,462,000
116.1%
6,394,000
1,477,000
3,436,804
4,917,000
332.9%
730,000
716,000
601,171
14,000
2.0%
-
-
-
-
0.0%
27,000
7,000
1,152,975
20,000
6.8%
208,201,000
204,150,000
136,590,747
3,584,000
1.8%
79,651,000
75,944,000
68,973,111
3,707,000
4.9%
120,926,000
110,785,000
49,239,274
10,141,000
9.2%
27,434,000
25,369,000
11,049,422
2,065,000
8.1%
995,000
1,078,000
1,242,152
(83,000)
-7.7%
854,000
800,000
686,152
54,000
6.8%
229,860,000
213,976,000
131,190,111
15,884,000
7.4%
(16,613,000) (29,958,000) (17,947,667) 13,345,000 34.5%
16,613,000 29,958,000 17,946,432 (13,345,000) 34.5%
229,860,000 213,976,000 131,188,876 15,884,000 7.4%
8,494,000 8,494,000 0.0%
238,354,000 213,976,000 131,188,876 24,378,000 11.4%
(30,153,000) (9,826,000) 5,401,871 (20,794,000) 211.6%
23,729,000 13,855,000 (4,111,615) 9,874,000 71.3%
(6,424,000) 4,029,000 1,290,256 (10,920,000) -271.0%
Toronto and Region
www.trca.ca Conservation
Authority
RES.#A25/20 - PROCUREMENT SUMMARY
Receipt of the 2019 summary of procurements approved by the Chief
Executive Officer or Designate, Executive Committee, or the Board of
Directors.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
THAT the 2019 Procurement Summary Report (the Report) of Toronto and Region
Conservation Authority (TRCA) for procurements approved in excess of $10K in 2019 be
received;
AND FURTHER THAT the Report continue to be provided to the Executive Committee on
a yearly basis, with a link to the full list of procurements over $10K available on the TRCA
website.
CARRIED
BACKGROUND
At Authority Meeting #5/05, held on June 24, 2005, staff were requested to report to the
Authority on contracts executed by TRCA in excess of $10K. Pursuant to this resolution, a
summary of awarded contracts in 2019 are included in Attachment 1. All contract revisions that
were approved in 2019, including previously approved revisions associated with the contract,
are recorded in Attachment 2.
At Board of Directors Meeting #8/18, held on October 26, 2018, the Procurement Policy (the
Policy) was approved. Approval thresholds and purchasing methods (expense authorization)
are included in Attachment 3. As permitted under the Policy, the Chief Executive Officer has
designated senior staff to approve purchases up to $10K which are not included in this
summary report. Excluded from the summary report are goods and services exempt from
procurement and purchase order approvals (these items are listed in Attachment 4). Attachment
5 lists the non -application criteria for goods and services exempt from public sector procurement
guidelines. Attachment 6 includes the criteria for limited tendering procurement.
In accordance with resolution #A31/18 from Authority Meeting #2/18, held on March 23, 2018,
the full list of procurements over $10K has not been attached to the agenda and will be provided
via a link to the TRCA website.
FINANCIAL DETAILS
The total value of procurements for TRCA in 2019, in excess of $10,000 approved by the Chief
Executive Officer or Designate, Executive Committee, or Board of Directors, was approximately
$46AM ($64AM in 2018), including contingencies and excluding applicable taxes.
The decrease in the total value of approved procurements in 2019 can be attributed to fewer
multi-year and large dollar value contracts executed in 2019. The number of Vendor of Record
Arrangements established has also decreased from previous years.
As shown in Attachment 2, the total value of contract increases was $6.9M and contract
decreases due to scope changes was $4.4M for a total net value of revisions equal to
approximately $2.5M. These contract increases and decreases are largely a result of changes
associated with the East Don Trail construction project. Scope changes for the East Don Trail
construction project are largely due to changing and unknown or challenging physical site
conditions (e.g., seepage areas) reflecting the nature of the project within this environmentally
sensitive and deeply incised valley.
In 2019, approximately 66% of approved contracts included a contingency in the range of 10-
15% (Attachment 7). The total amount of contingency that was approved in 2019 was $3.96M,
of which approximately $527K was used by the end of the year. Contracts that were approved in
2019 that are multi-year contracts may have an additional portion of the contingency used over
the course of the contract term. Contingencies for new and multi-year contracts will continue to
be formally tracked and reported on.
Report prepared by: Lisa Moore, extension 5846
Emai Is: Iisa.mooreC&trca.ca
For Information contact: Lisa Moore, extension 5846
Emai Is: I isa. moore(cDtrca.ca
Date: March 9, 2020
Attachments: 7
Attachment 1 — Summary of Procurements
Attachment 2 — Contract Revisions
Attachment 3 — Expense Authorization
Attachment 4 — Goods and Services Exempt from Procurement and Purchase Order Approvals
Attachment 5 — Non -Application Criteria
Attachment 6 — Limited Tendering Criteria
Attachment 7 — Contingency Summary
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Engineering services for
slope stability, erosion
Eldorado Court,
risk assessment, and
Grandravine Drive and
alternative conceptual
AECOM CANADA
$225,489.00
$22,548.90
$248,037.90
11
5
Restoration and
Ladyshot Crescent, in the
LTD.
Infrastructure
design for forty-five (45)
City of Toronto
properties in the City of
Toronto.
Fill Quality Control, Site
Decommissioning and
2019 laboratoryALS
Canada Ltd
$49300.00
,
$4930.00
,
$54230.00
,
q
3
Restoration and
Environmental Monitoring
analytical services.
Infrastructure
Programs
Professional engineering
services for preliminary
Wiley Bridge
design, detailed design
AMTEC Engineering
$36,325.00
$5,448.75
$41,773.75
17
3
Corporate Services
Ltd
and contract
administration services.
Pre -construction and
Upper Highland Creek Pan
post -construction CCN
Andrews Engineer
$33,274.00
$12,000.00
$45,274.00
12
1
Restoration and
Am Path Connection
inspection services of
Infrastructure
sanitary infrastructure.
Newtonbrook Creek
Engineering services for
Bridge Replacement Slope
detailed designs for
AQUAFOR BEECH
$35,800.00
$3,580.00
$39,380.00
7
2
Restoration and
LIMITED
Infrastructure
Stabilization Project
slope stabilization.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Engineering services for
Grey Abbey Ravine Slope
development of detailed
AQUAFOR BEECH
$59,160.00
$5,916.00
$65,076.00
5
1
Restoration and
Stabilization Project
LIMITED
Infrastructure
designs.
Professional engineering
Yellow Creek Channel
services for 3 conceptual
Aquafor Beech Ltd.
$36,950.00
$5,542.50
$42,492.50
6
3
Restoration and
Stabilization
designs and detailed
Infrastructure
design package.
Professional engineering
services for geomorphic
Humber River Bank
assessment,
Restoration and
Stabilization Project (P-
geotechnical
Aquafor Beech Ltd.
$59,980.00
$5,998.00
$65,978.00
7
5
Infrastructure
004, P-005)
investigation, and
detailed design
development.
TRCA New Administrative
Facilities management
Bouygues Energies &
$386,410.79
$57,961.62
$444,372.41
23
4
Corporate Services
Office Building
services.
Services
Urban indigenous
Outdoor Gathering Space
collaboration and
Community
at Morningside Park
consultation services to
Cambium Aboriginal
$54,634.74
$8,195.21
$62,829.95
4
2
Engagement and
Project
develop design
Inc
Outreach
requirements.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
TRCA GIS Plotter Machine
Toner and printhead.
CDW Canada Inc.
$16,009.20
$1,600.92
$17,610.12
2
2
Corporate Services
Appletree Court and
Geotechnical
Seeley Drive Erosion
engineering services for
Central Earth
$18,440.00
$5,000.00
$23,440.00
7
3
Restoration and
Control and Slope
slope stability and
Engineering
Infrastructure
Stabilization Project
erosion risk assessment.
Professional engineering
services for geotechnical
Gaffney Park Erosion
investigation and
Central Earth
$23,640.00
$2,364.00
$26,004.00
12
5
Restoration and
Control and Drainage
Engineering
Infrastructure
conceptual design
development.
Geotechnical
engineering services for
a slope stability
Lakeland Drive Major
assessment and
Central Earth
$102,670.00
$15,400.50
$118,070.50
5
2
Restoration and
Maintenance Project
Engineering
Infrastructure
development of
conceptual design
alternatives.
Professional engineering
services for a
37-39 Topcliff Avenue
geotechnical
Central Earth
$17,990.00
$1,799.00
$19,789.00
8
3
Restoration and
Slope Stabilization Project
Engineering, Ltd.
Infrastructure
investigation to update
detailed design package.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Flood Risk Awareness and
Education Program's
Public meeting
DILLON CONSULTING
$22,730.00
$4,546.00
$27,276.00
5
5
Development and
facilitation services.
LTD
Engineering Services
Public Open House
Energy engineering
services for Region of
Region of Peel Energy
Peel's energy
Enerlife Consulting
$2g 345.00
$5,669.00
$34,014.00
3
2
Watershed
Savings Workshops
Inc.
Strategies
conservation and GHG
reduction projects.
Fluvial Geomorphic and
Conservation Drive Park
Hydraulic Assessment
GEO MORPHIX LTD.
$10,257.50
$1,025.75
$11,283.25
6
4
Restoration and
Stream Restoration
Infrastructure
and Design.
TRCA's New
Vertical test boring
Administrative Office
services for ground -loop
GEOSOURCE ENERGY
$31,000.00
$3,100.00
$34,100.00
9
2
Corporate Services
Building
heatexchange.
Engineering services for
Morningside East
a geotechnical
Scarborough Storefront
investigation and
GHD
$73,493.00
$7,349.30
$80,842.30
7
3
Restoration and
Infrastructure
Trail
detailed design of a trail
connection.
Palace Pier Court
Coastal engineering
Headland Maintenance
services for detailed
GHD Limited
$39,319.50
$3,931.95
$43,251.45
7
4
Restoration and
Infrastructure
Project
designs.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Geomorphic analysis,
Bartley Drive Ravine
erosion -risk assessment,
GHD Limited
$41,534.00
$4,153.40
$45,687.40
3
3
Restoration and
and two concept
Infrastructure
designs.
Professional engineering
services for hydraulic
73-95 Clarinda Drive Slope
Stabilization and Erosion
analysis, stormwater
GHD Limited
$54,200.00
$5,420.00
$59,620.00
5
4
Restoration and
management analyses,
Infrastructure
Control Project
tree inventory, and
geomorphic assessment.
Coastal engineering
Prince of Wales Major
services to develop
GHD Limited
$53,371.00
$8,005.65
$61,376.65
8
5
Restoration and
Maintenance Project
Infrastructure
detailed designs.
Civil engineering services
26-30 Livingston Road
for detailed design
GRECK &
$19,630.00
$3,926.00
$23,556.00
5
1
Restoration and
Phase 6
ASSOCIATES LTD.
Infrastructure
development.
Professional engineering
for fluvial
King's Park Stream
geomorphology,
GRECK &
$33,636.00
$5,045.40
$38,681.40
7
3
Restoration and
Restoration Project
ASSOCIATES LTD.
Infrastructure
hydraulic assessment,
and design.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Professional engineering
German Mills Settlers Park
Sanitary Infrastructure
services for detailed
GRECK &
$56,020.00
$8,403.00
$64,423.00
8
3
Restoration and
design and construction
ASSOCIATES LTD.
Infrastructure
Protection Project
administration.
Equipment Acquisition -
Fabrication of new
HALLTECH AQUATIC
$85,250.00
$17,050.00
$102,300.00
8
1
Corporate Services
E lectrofishing Vessel
electrofishing boat.
RESEARCH INC.
Rental, installation and
Patterson Richvale and
demobilization of bypass
Herc Rentals
$40,125.00
$6,018.75
$46,143.75
9
3
Restoration and
Valley
Infrastructure
pumping systems.
Conceptual and final
BCPV Flynn House Exhibit
graphic design of
HOLMAN EXHIBITS
$29,500.00
$4,425.00
$33,925.00
7
3
Parks and Culture
exhibit.
Master CCN Contract for
Pre -construction and
City of Toronto Erosion
INFRASTRUCTURE
Control and Slope
post -construction closed
INTELLIGENCE
$30,370.00
$3,037.00
$33,407.00
11
3
Restoration and
circuit television (CCN)
Infrastructure
Stabilization Projects -
SERVICES INC.
2019/2020
inspections.
Professional consulting
services for the
Black Creek Pioneer Village
commissioning of BCPV
1LSR Engineering Inc.
$26,800.00
$2,680.00
$29,480.00
3
3
Corporate Services
Visitor's Centre
Mechanical System.
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Engineering consulting
2019 Bolton Flood and Ice
services to investigate
KGS GRoup
$50,914.00
$10,182.80
$61,096.80
18
3
Development and
Jam
and analyze the 2019
Engineering Services
Bolton Ice Jam.
Engineering services to
Ajax and Pickering Dykes
undertake a
KGS Group
$155,107.00
$38,776.75
$193,883.75
17
2
Development and
Rehabilitation Class EA
Conservation Ontario
Consulting Engineers
Engineering Services
Class EA.
Consulting services for
Don River floodplain
G. Ross Lord Dam Gate
mapping update and G.
KGS Group
$169,775.00
$33,955.00
$203,730.00
27
6
Restoration and
Operation
Consulting Engineers
Infrastructure
Ross Lord Dam gate
operational review.
professional engineering
Bolton Berm Major
services for detailed
KGS Group
$204,139.00
$20,413.90
$224,552.90
31
1
Restoration and
Maintenance
Consulting Engineers
Infrastructure
design.
Professional consulting
services for the
development of logic
models, theory of
Climate Change Key
change and a template
KPMG
$135,367.50
$27,073.50
$162,441.00
4
4
Parks and Culture
Performance Indicators
and methodology for
outcome based Key
Performance Indicators
(KPIs).
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Vendors
Responded
(Responsible)
Microsoft Software
Microsoft E3 licensing
Long View
$125,000.00
$12,500.00
$137,500.00
5
5
Corporate Services
Licenses
for full-time staff.
Microsoft Licensing
Microsoft subscription
Long View Systems
for products and
$594,472.08
$59,447.21
$653,919.29
4
4
Corporate Services
Solutions Provider
Corporation
services.
Geotechnical
Bolton Camp Retaining
engineering services for
McIntosh Perry
$8,510.00
$1,702.00
$10,212.00
36
8
Corporate Services
Wall
proposed retaining wall
Consulting Engineers
design.
Engineering services for
70 Main Street South
detailed design
Mooney Mataxas
$52,184.40
$7,827.66
$60,012.06
37
4
Restoration and
Erosion Control Project
development and
Inc.
Infrastructure
engineering support.
Professional Engineering
Services for the
assessment/
Albion Hills Field Centre
investigation,
MOON-MATZ LTD.
$25,490.00
$2,549.00
$28,039.00
28
4
Corporate Services
Loading Dock
preliminary designs and
development of a
detailed design.
15 small adult sized
Education and
Albion Hills Field Centre
adjustable fat bikes and
Moose Bicycle
$14,885.00
$744.25
$15,629.25
4
4
2 junior fat bikes.
Training
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Consulting engineering
services to undertake a
Highland Creek Markham
flood remediation
Branch (Corporate Drive)
technical study and a
MORRISON
$367,158.00
$55,000.00
$422,158.00
2
2
Restoration and
Flood Remediation Class
HERSHFIELD LIMITED
Infrastructure
municipal class
EA
environmental
assessment.
Design services for
Broadview and Eastern
phase 1 of
Morrison Hershfield
$62,000.00
$12,400.00
$74,400.00
29
1
Corporate Services
Flood Protection
Limited/Morrison
implementation.
Uniformed Security
Services for TRCA Facilities
Uniformed security
Neptune Security
$962,950.00
$144,442.50
$1,107,392.50
4
4
Parks and Culture
2019-2024
services.
Palmer
Fluvial geomorphic
Rainbow Creek Sanitary
assessment and concept
Environmental
$16382.00
,
$1638.20
$18020.20
,,
6
2
Restoration and
Trunk Sewer
Consulting Group
Infrastructure
development.
Inc.
Palmer
West Don River in E.T.
Professional fluvial
Seton Park Major
geomorphic consulting
Environmental
$16,946.00
$2,541.90
$19,487.90
6
5
Restoration and
Consulting Group
Infrastructure
Maintenance Project
services.
Inc.
Palmer
Geotechnical
72 Heath Street East
engineering consulting
Environmental
$19,529.00
$1,792.90
$21,321.90
7
3
Restoration and
Consulting Group
Infrastructure
services.
Inc.
10
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Palmer
Newtonbrook Creek South
Fluvial geomorphology
Environmental
$19,955.00
$2,993.25
$22,948.25
5
5
Restoration and
of Finch Avenue East
services.
Consulting Group
Infrastructure
Inc.
Palmer
Geomorphic analysis,
Black Creek Tributary East
erosion risk assessment,
Environmental
$11,253.00
$1,687.95
$12,940.95
3
3
Restoration and
of Topcliff Avenue
Consulting Group
Infrastructure
and conceptual design.
Inc.
Lambton Woods Park
Pedestrian Bridge
Engineering and detailed
Planmac Engineering
$24,487.50
$4,897.50
$29,385.00
6
6
Restoration and
design services.
Inc.
Infrastructure
Replacement
Governor's Bridge Lookout
Engineering design
PLANT ARCHITECT
$37,998.00
$3,799.80
$41,797.80
5
2
Restoration and
services.
INC.
Infrastructure
Sustainable
Video Production
Neighbourhood Action
Services for the SNAP
POWERLINE FILMS
$19,840.00
$3,968.00
$23,808.00
3
3
Corporate Services
Program-Videography
team.
Burke Brook Ravine, East
Engineering and design
R.V. ANDERSON
Restoration and
of Bayview Trail
consulting services for
$93,173.75
$9,317.37
$102,491.12
7
1
ASSOCIATES LIMITED
Infrastructure
Improvements
trail improvements.
11
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Ajax Waterfront Outfall
Coastal engineering
Resilient Consulting
$12,880.00
$1,288.00
$14,168.00
7
2
Restoration and
Protection
services.
Corporation
Infrastructure
Engineering support
services for the technical
review ofNDMPfunded
NDMPFIoodplain
floodplain mapping
Resilient Consulting
$50 ,000.00
$5,000.00
$55,000.00
2
2
Development and
Mapping Update
Corporation
Engineering Services
updates and technical
input into watershed
planning initiatives.
Professional engineering
services for restoration
Duffins Marsh Southwest
ofSimcoe Point Marsh
Resilient Consulting
$27,918.00
$2,791.80
$30,709.80
3
1
Restoration and
Lagoon Restoration
Water Control/Carp
Ltd
Infrastructure
Exclusion Gates.
Eastern Beaches 2019
Emergency Flood
Coastal engineering
Shoreplan
$12,800.00
$1,280.00
$14,080.00
4
3
Restoration and
design services.
Engineering Ltd.
Infrastructure
Mitigation Works
Ward's Island Shoreline
Coastal assessment and
Shoreplan
$14,900.00
$1,490.00
$16,390.00
4
2
Restoration and
Protection
detailed design services.
Engineering Ltd.
Infrastructure
12
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Frisco Road Outlook
Coastal engineering
Shoreplan
$15,500.00
$1,550.00
$17,050.00
3
3
Restoration and
design services.
Engineering Ltd.
Infrastructure
Humber Bay Park East
Coastal engineering
Major Maintenance
services to develop
Shoreplan
$107,400.00
$10,740.00
$118,140.00
16
3
Restoration and
Engineering Ltd.
Infrastructure
Project
detailed designs.
Magical Christmas Forest
Santa services.
Sphere
$12,500.00
$625.00
$13,125.00
4
2
Education and
2019
Entertainment
Training
Supply and delivery of
Kortright Gift Shop
packaged food service
Sysco
$10,000.00
$1,000.00
$11,000.00
3
3
Education and
and disposable items.
Training
TRCA's New
Administrative Office
Public art consulting
Tatar Art Projects
$35,000.00
$3,500.00
$38,500.00
5
3
Corporate Services
Building
services.
Microsoft Office 365
Consulting Services to
Talus
migrate from IBM Notes
$125,975.00
$0.00
$125,975.00
5
3
Corporate Services
Migration
to Office 365.
Communications Inc.
13
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
IT security services for
Vulnerability Assessment
systems penetration and
Tera Mach
$23,525.00
$0.00
$23,525.00
2
2
Corporate Services
for IT Systems
vulnerability testing.
Geotechnical
96-106 Windhill Crescent
engineering services for
Terraprobe Inc.
$28,425.00
$2,842.50
$31,267.50
7
3
Restoration and
slope stability and
Infrastructure
erosion risk assessment.
Engineering services for
111 Longview Crescent
detailed design
Terraprobe Inc.
$34,270.00
$5,140.50
$39,410.50
2
2
Restoration and
Erosion Control Project
Infrastructure
development.
Geotechnical
35-37 Shendale Dr. Slope
engineering services for
TERRAPROBE INC.
$40,685.00
$4,068.50
$44,753.50
2
2
Restoration and
Stabilization Project
Infrastructure
detailed design.
St. Andrews Cemetery
Engineering services for
Slope Stability & Erosion
slope stabilization and
TERRAPROBE INC.
$49,565.00
$4,956.50
$54,521.50
5
1
Restoration and
Infrastructure
Risk Assessment
erosion risk assessment.
Alderbrook Drive and
Professional structural
TERRAPROBE INC.
$51,070.00
$7,660.50
$58,730.50
5
1
Restoration and
Bucksburn Road
engineering services.
Infrastructure
14
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Geotechnical, civil
90 Meadowcliffe Drive
engineering, and
TERRAPROBE INC.
$63,085.00
$12,617.00
$75,702.00
5
2
Restoration and
landscape architecture
Infrastructure
services.
Geotechnical
engineering services to
Denison Road
undertake a slope
TERRAPROBE INC.
$66,085.00
$13,217.00
$79,302.00
6
3
Restoration and
stability assessment and
Infrastructure
conceptual design
alternatives.
21, 23, & 25 Peacham
Crescent Erosion Control
Engineering services to
TERRAPROBE INC.
$94,990.00
$9,499.00
$104,489.00
6
2
Restoration and
and Slope Stabilization
develop detail designs.
Infrastructure
Project
Geotechnical
Bartley Drive Ravine
engineering services and
Terraprobe, Inc.
$34,660.00
$5,199.00
$39,859.00
2
2
Restoration and
conceptual design
Infrastructure
development.
Claremont Field Centre
Protein for Claremont
THE BUTCHER
$9,800.00
$490.00
$10,290.00
2
2
Education and
Food Supply
Field Centre.
SHOPPE
Training
BBQ lunch catering for
Community
2019 Bike The Creek
The Gourmet Group
$8,600.00
$2,150.00
$10,750.00
3
3
Engagement and
community participants.
Outreach
15
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Professional Engineering
Services for the
High Barn at Albion Hills
structural assessment,
Thornton Tomasetti
$16,800.00
$2,520.00
$19,320.00
7
6
Corporate Services
CA
detailed design and
Canada Inc.
construction
administration.
York Region Canopy Cover
Land cover and tree
Mapping and Change
canopy mapping services
UNIVERSITY OF
$72,163.80
$0.00
$72,163.80
5
3
Policy and Planning
Assessment
for 2019.
VERMONT
Engineering services for
Mimico Creek Floodplain
HEC -RAS hydraulic
Valdor Engineering
$37573.00
,,
$3,757.30
$41330.30
9
9
Development and
Mapping Update
model and floodplain
Inc.
Engineering Services
mapping update.
Supplementary bare
Supplementary Bare Root
root plants for TRCA Fall
VERBINNEN'S
$16,921.25
$3,384.25
$20,305.50
5
4
Restoration and
Fall 2019
Planting
NURSERY
Infrastructure
Program/Projects.
Solid Waste and Recycling
Solid waste and
Collection Management
recycling services from
Waste Management
$116,692.00
$11,669.20
$128,361.20
4
4
Corporate Services
of Canada
Program
2019 to 2021.
Coastal engineering
Sunnyside Park Revetment
services to develop
WF Baird and
$57,998.00
$5,799.80
$63,797.80
7
2
Restoration and
Maintenance Project
Associates
Infrastructure
detailed design.
16
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Vendors
Responded
(Responsible)
2019 Rouge River
Engineering services for
Wood Environment
Floodplain Mapping
HEC -RAS hydraulic
& Infrastructure
$87,435.86
$8,743.59
$96,179.45
6
6
Restoration and
model and floodplain
Infrastructure
Update - Phase I
mapping update.
Solutions
Engineering services for
Rouge River Floodplain
HEC -RAS hydraulic
Wood Environment
Development and
& Infrastructure
$94,391.11
$9,439.11
$103,830.22
8
8
Mapping -Phase 2
model and floodplain
Solutions
Engineering Services
mapping update.
Engineering services for
Duffins Creek Floodplain
HEC -RAS hydraulic
d
WooEnvironment
Development and
&Infrastructure
$99,910.00
$9,991.00
$109,901.00
11
11
Mapping Update
model and floodplain
Solutions
Engineering Services
mapping update.
Black Creek at Rockcliffe
SPA Flood Remediation
Professional engineering
Wood Environmental
Development and
& Infrastructure
$498,126.00
$49,812.60
$547,938.60
3
3
and Transportation
services.
Solutions
Engineering Services
Feasibility Study
Petticoat Creek Hydrology
Engineering services for
WSP Canada Group
Development and
the development of a
$55,205.00
$8,280.75
$63,485.75
6
6
Update
Ltd.
Engineering Services
hydrologic model.
Engineering services for
Don River Floodplain
the preparation of a HEC
WSP Canada Group
Development and
RAS hydraulic model and
$99,962.50
$16,000.00
$115,962.50
22
4
Mapping Update —Phase II
floodplain mapping
Ltd.
Engineering Services
update.
17
Attachment 1 - Summary of Procurements
Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Vendors
Responded
(Responsible)
Procured
2012111 Ont Inc O/A
Cost
Revisions)
Vendors
(Responsible)
RWMP/Mayfield/RNUP/Se
Facility rental and
York Durham
$82,722.84
$12,408.43
$95,131.27
3
3
Education and
aton2019
Bathurst Glen/Albion
Water quality lab
Regional
$33,290.40
$3,329.04
$36,619.44
1
1
Restoration and
analysis.
Environmental
Infrastructure
Hills
Hills
ADDISON
Environmental Monitoring
Acquisition of one (1)
Laboratory
$33,550.00
$3,355.00
$36,905.00
7
2
Corporate Services
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Vendors
Responded
(Responsible)
2012111 Ont Inc O/A
TRIECA Conference 2020
Facility rental and
Pearson Convention
$82,722.84
$12,408.43
$95,131.27
3
3
Education and
catering services.
Training
Center
2019 Vehicle Acquisition -
ADDISON
Environmental Monitoring
Acquisition of one (1)
$33,550.00
$3,355.00
$36,905.00
7
2
Corporate Services
dans 1 crew cab truck.CHEVROLET-GMC-
and Data Management.
BUICK
General contractor for
the demolition and new
Albion Hills Field Centre
construction of the
Adems Restoration
$149,000.00
$29,800.00
$178,800.00
3
3
Corporate Services
Albion Hills Field Centre
loading dock.
Drone services and
Various Restoration
delivery of unrestricted
AeroVision Canada
$9,480.00
$2,370.00
$11,850.00
5
4
Restoration and
Projects
license of imagery/data
Infrastructure
to TRCA.
LiDAR data for all of
Li DAR 2019
TRCA jurisdiction and
Airborne Imaging
$153,775.62
$0.00
$153,775.62
7
7
Corporate Services
York Region.
18
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Construction services for
Jennifer- Whitburn Multi-
an AODA compliant
AMAC Paving Ltd.
$181,157.50
$18,115.75
$199,273.25
13
9
Restoration and
use Trail Connection
Infrastructure
multi use trail.
Supply and delivery of
AMCO PUMP
2019 Equipment
one (1) new 6" diesel
MANUFACTURING
$66,674.00
$6,667.40
$73,341.40
7
2
Corporate Services
Acquisitions
silenced trash pump.
INC.
Albion Hills CA
Supply and installation
Anthony Furlano
$20,500.00
$4,100.00
$24,600.00
37
5
Restoration and
of pedestrian railing.
Construction Inc.
Infrastructure
Paradise Park
Asphalt road paving.
Appco Paving
$22,000.00
$2,200.00
$24,200.00
8
4
Restoration and
Infrastructure
Install transition area in
Petticoat Creek Pool
asphalt to eliminate
Appco Paving Ltd.
$10,000.00
$1,000.00
$11,000.00
1
1
Corporate Services
tripping hazard.
Ice for Resale 2019 - 2020
Ice for resale at TRCA
Arctic Glacier Canada
$9,900.00
$990.00
$10,890.00
3
3
Parks and Culture
Operating Seasons
Parks facilities.
Inc.
Professor Lake
Asphalt re -paving
Ashland Paving Ltd
$44,284.61
$11,071.15
$55,355.76
8
3
Restoration and
services.
Infrastructure
Bluffer's Park South
Supply and delivery of
Headland and Beach
14,000 tonnes of 5-7
Atlantis Marine
$973,000.00
$97,300.00
$1,070,300.00
17
3
Restoration and
Construction
Infrastructure
Major Maintenance
tonne armourstone.
19
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Mimico Creek Behind
Ontario Land Surveyor
AVANT[ SURVEYING
$14,000.00
$1,400.00
$15,400.00
11
4
Restoration and
Ridgegate Crescent
(OLS) services.
INC.
Infrastructure
Electrical upgrades at
both the Restoration
Services Centre and
Restoration and
Boyd Centre for
BOLTON ELECTRIC
$12,700.00
$3,175.00
$15875.00
,
2
2
Restoration and
Infrastructure Campus
COMPANY INC
Infrastructure
construction operations
and electric vehicle
charging stations.
Labour, equipment and
Upper Highland Creek at
materials for the
Ellesmere Road - Pan Am
installation of three
Bronte Construction
$2,977,000.00
$297,700.00
$3,274,700.00
23
3
Restoration and
Ltd.
Infrastructure
Path Connection Project
pedestrian bridges and
connecting asphalt trail.
Long Branch Major
Supply and delivery of 4-
C.D.R. YOUNG'S
$207,246.00
$0.00
$207,246.00
11
3
Restoration and
Maintenance Project
6 tonne armourstone.
AGGREGATES INC.
Infrastructure
Horse drawn wagon
2020 Maple Syrup Festival
rides at Bruce's Mill and
Caledon Horse and
$28,500.00
$2,850.00
$31,350.00
6
2
Corporate Services
Kortright.
Carriage
Bathurst Glen GC and
2500 x 12 - 2 piece range
Callaway Golf
$16,875.00
$1,687.50
$18,562.50
3
2
Parks and Culture
Bruce's Mill CA
balls.
Company
20
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Construction and
Supply and delivery of 6
Restoration Projects
foot high galvanized
Can Industrial
$10,000.00
$0.00
$10,000.00
10
2
Restoration and
Infrastructure
Temporary Fencing
steel fence panels.
6 foot high construction
Various Construction
fence minimum 60
Can Industrial
$32,050.00
$3,205.00
$35,255.00
6
2
Restoration and
Projects
Infrastructure
pounds per panel.
Steel doors and frames
Indian Line Campground
for washroom buildings,
CANUCK DOOR
$15,200.00
$1,520.00
$16,720.00
3
3
Parks and Culture
workshop and
SYSTEMS.COM
driveshed.
Bluffer's Park South
Headland and Beach
5-7 tonne armour stone.
CDR Young
$999,875.00
$99,987.50
$1,099,862.50
15
1
Restoration and
Aggregates
Infrastructure
Major Maintenance
Supply and delivery of 2-
Lakeview Waterfront
5 Tonne piece stackable
CDR Young's
$527,000.00
$52,700.00
$579,700.00
9
4
Restoration and
Connection Project
Aggregates
Infrastructure
armourstone.
Supply and delivery of 6 -
Lakeview Waterfront
8 tonne piece
CDR Young's
$105,600.00
$10,560.00
$116,160.00
9
4
Restoration and
Connection Project
armourstone with flat
Aggregates
Infrastructure
bottom and top.
Supply and delivery of
Upper Nine Storm Pond
manholes and headwall
Restoration and
Retrofit Drainage
Con -Cast Pipe Inc.
$22,905.00
$2,290.50
$25,195.50
10
2
Infrastructure
components as per
Infrastructure
design/drawings.
21
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Fire alarm and
Restoration and
emergency lighting
Infrastructure Campus and
inspection, certification,
Control Fire Systems
$22,110.00
$6,633.00
$28,743.00
5
2
Restoration and
Infrastructure
Swan Lake
testing, maintenance
and repair services.
Tracked carrier crawler
Morningside Park
to move material on-
Cooper Equipment
$9,875.00
$987.50
$10,862.50
4
4
Restoration and
Rentals
Infrastructure
site.
Claremont Nature Centre
Propane fuel for heating.
Cooper Fuels Ltd.
$8,500.00
$1,700.00
$10,200.00
3
3
Education and
Training
Paradise Park Wetland
Rental of tracked
cooper rental
$9,500.00
$950.00
$10,450.00
3
3
Restoration and
crawler.
Infrastructure
Equipment, labour and
9751 Canada Company
Cornerstone Building
Way Washroom
m aterials for renovation
msecond
and Property
$11,467.47
$1,376.10
$12,843.57
5
2
Corporate Services
floor
Renovation
washroom.
Services Inc.
Supply and delivery of a
Asset -Office
20 foot steel office
s Sales and
$16,995.00
$0.00
$16,995.00
10
1
Restoration and
Container
o
Rentals
Rental
Infrastructure
container.
Supply, delivery and
Don Mills Access, South of
installation of concrete
CSL GROUP LTD.
$257,180.00
$25,718.00
$282,898.00
3
3
Restoration and
Overlea Trail Project
Infrastructure
park infrastructure.
22
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Planting Sites Fall 2019
Deer fencing.
Deer Fence Canada
$13,568.00
$1,356.80
$14,924.80
4
3
Restoration and
Inc.
Infrastructure
Labour, equipment and
Delsan-A.I.M.
7395 Reesor Rd Building
materials for demolition
Environmental
$22,120.00
$4,424.00
$26,544.00
3
3
Corporate Services
and removal.
Services Inc.
Pomona Creek P-080
Asphalt paving is
Sanitary Infrastructure
required to replace 255
DIAMOND
$15,081.75
$1,508.18
$16,589.93
9
5
Restoration and
Protection Project
m2 of asphalt trail.
EARTHWORKS CORP.
Infrastructure
Tennis Canada SWMP
Asphalt re -paving
DIAMOND
$33,210.00
$6,642.00
$39,852.00
8
3
Restoration and
services.
EARTHWORKS CORP.
Infrastructure
Labour, equipment and
materials for paving and
Various Construction
repaving of park trails
DIAMOND
$308,749.30
$30,874.93
$339,624.23
12
8
Restoration and
Projects
EARTHWORKS CORP.
Infrastructure
and parking lots at 6
sites.
Solidification reagent for
Toronto SWMP
8 City of Toronto
DiCorp
$204,900.00
$30,735.00
$235,635.00
7
3
Restoration and
Maintenance Polymer
Infrastructure
SWMPs.
Sediment solidification
of storm pond
York University SWMP
sediments as part of a
Di -Corp
$16,524.00
$1,652.40
$18,176.40
4
2
Restoration and
Maintenance POLYMER
pond cleanout for York
Infrastructure
University's Tennis
Canada pond.
23
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Electrical contractor
Petticoat Creek
services to upgrade the
DILISADO
$34,850.00
$5,227.50
$40,077.50
3
3
Corporate Services
Conservation Area
main control panels in
ENTERPRISES
the pool house.
2019 Vehicle Acquisition -
Engineering Projects
Acquisition of one (1)
DONWAY FORD
$37,709.00
$3,770.90
$41,479.90
7
1
Corporate Services
class 2 crew cab truck.
SALES LIMITED
Supervisor
2019 Vehicle Acquisitions -
Acquisition of two (2)
Restoration Projects and
550/5500 (Class 5) crew
DONWAY FORD
$159,278.72
$15,927.87
$175,206.59
7
2
Corporate Services
Resource Management
cab chassis trucks.
SALES LIMITED
Projects
mix 50% for
KortrSalt/Sand
Winter
winter road
DRAGLAM SALT
$9,416.00
$941.60
$10,357.60
4
2
Education and
Maintenance
Maintance Supplies
M
Training
maintenance.
Pre and post condition
Mimico Creek behind
surveys and vibration
DST Consulting
$26,600.00
$2,660.00
$29,260.00
3
2
Restoration and
Ridgegate Crescent
Engineers Inc.
Infrastructure
monitoring.
Ashbridges Bay Landform
Supply and delivery of
DUFFERIN
367
$3,,000.00
$336,700.00
703700.00
$3,,
24
6
Restoration and
Project
core stone.
AGGREGATES
Infrastructure
Supply and install 6
Tommy Thompson Park
swing gates for the
Dufferin Iron &
$10,800.00
$2,160.00
$12,960.00
11
5
Restoration and
purpose of traffic
Railings
Infrastructure
calming.
24
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Construction of sewage
Bolton Camp
pump station, sanitary
Earth Boring Co. Ltd.
$3,847,082.00
$769,416.40
$4,616,498.40
6
6
Corporate Services
sewer and watermain.
Shredded Pine Mulch Fall
Mulch for plantings.
EARTHCO SOIL
$10,080.00
$1,008.00
$11,088.00
6
3
Restoration and
2019 Restoration Projects
MIXTURES
Infrastructure
Spring Planting 2019
Shredded pine mulch.
Earthco Soils Inc
$19,259.00
$3,851.80
$23,110.80
4
3
Restoration and
Infrastructure
2019 Equipment
Supply and delivery of
Acquisition - Resource
two (2) new tractor
EASTERN FARM
$11,600.00
$1,160.00
$12,760.00
4
2
Corporate Services
Management Projects
mounted skidding
MACHINERY LTD.
(RMP)
winches.
Supply and delivery of
2019 Equipment
One (1) Off -Road Utility
Ed Stewart's
$20,400.00
$2,040.00
$22,440.00
2
1
Corporate Services
Acquisition
Equipment Ltd.
Vehicle.
2019 Equipment
Acquisition of one (1) off
Ed Stewart's
Acquisition - Glen Haffy
$23,547.63
$2,354.76
$25,902.39
4
1
Corporate Services
road utility vehicle.
Equipment Ltd.
Conservation Area
Pre Demolition Asbestos
7395 Reesor Rd
Containing Materials
ENVIROSAFE INC.
$9,630.00
$1,926.00
$11,556.00
4
2
Corporate Services
abatement.
2019 Sugarbush Maple
Syrup Festival & Magical
Horse drawn wagon
Fairytale Horse and
$41,300.00
$4,130.00
$45,430.00
6
2
Parks and Culture
rides.
Carriage
Christmas Forest
25
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Contracting services for
24 Norfield Crescent -
replacement of chain-
FG Fencing and
$13,329.18
$1,332.92
$14,662.10
6
1
Restoration and
Minor Works
General Construction
Infrastructure
link fencing.
Indian Line Campground,
Bagged firewood and
Albion Hills Campground,
kindling for resale 2019
Firewood Guys
$78,550.00
$7,855.00
$86,405.00
4
3
Parks and Culture
and Glen Rouge
& 2020 operating
Campground
seasons.
Construction goods and
Boyd Centre Cafeteria
services for interior
Fresco Enterprises
$278,530.38
$41,779.56
$320,309.94
5
5
Corporate Services
Interior Renovations
renovation of Boyd
Inc.
Centre Cafeteria.
2019 Equipment
Acquisition of one (1)
G.C. DUKE
Acquisition - Bathurst Glen
$40,900.00
$4,090.00
$44,990.00
5
3
Corporate Services
triplex mower.
EQUIPMENT LTD.
Golf Course
Rental of access mats
capable of withstanding
Etobicoke Valley Park
Major Maintenance
weight up to 50 Tons
Gallo Contracting
$12,895.00
$1,289.50
$14,184.50
3
3
Restoration and
and protecting
Ltd.
Infrastructure
Project
underground City of
Toronto infrastructure.
Yellow Creek near Heath
Rental, delivery and
Street Erosion Control and
assembly of timber, or
Gallo Contracting
$28,950.00
$5,790.00
$34,740.00
8
1
Restoration and
Slope Stabilization Project
equivalent, access mud
Ltd.
Infrastructure
Emergency Works
mats.
26
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Boyd Office Workshop
Roof insulation services.
Gara Farm Buildings
$14,900.00
$2,980.00
$17,880.00
7
4
Restoration and
Inc
Infrastructure
Geotechnical and
Governor's Bridge Lookout
engineering services for
Geomaple
$13,100.00
$1,965.00
$15,065.00
3
3
Restoration and
Redesign Project
Geotechnics Inc.
Infrastructure
concept designs.
Geotechnical and
Nashville -Kirby Trail Phase
structural engineering
GeoTerre Limited
$11,350.00
$2,270.00
$13,620.00
8
7
Restoration and
2
Infrastructure
services.
Haulage of unsuitable
Rotary Park
armour stone off the
Glenn Windrem
$9,300.00
$930.00
$10,230.00
7
1
Restoration and
Trucking
Infrastructure
site.
Long Branch Major
Supply and delivery of
Glenn Windrem
$223,200.00
$0.00
$223,200.00
11
1
Restoration and
Maintenance Project
300-600mm rip rap.
Trucking
Infrastructure
Bluffer's Park South
Supply and delivery of
Headland and Beach
2,200 tons of 300-600
Glenn Windrem
$84,700.00
$8,470.00
$93,170.00
17
4
Restoration and
Trucking
Infrastructure
Major Maintenance
mm rip rap material.
Bluffer's Park South
Supply and delivery of
Headland and Beach
2,400 tons of 500-800
Glenn Windrem
$92,400.00
$9,240.00
$101,640.00
17
4
Restoration and
Trucking
Infrastructure
Major Maintenance
mm rip rap material.
Lakeview Waterfront
Supply and delivery of 3-
Glenn Windrem
Restoration and
5 Tonne piece non-
$470,000.00
$47,000.00
$517,000.00
9
4
Connection Project
Trucking
Infrastructure
stackable armourstone.
27
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Supply and delivery of
Lakeview Waterfront
0.4-0.8 tonne piece non-
Glenn Windrem
$125,550.00
$12,555.00
$138,105.00
9
3
Restoration and
Connection Project
stackable armourstone.
Trucking
Infrastructure
Lakeview Waterfront
Supply and delivery of
Glenn Windrem
$194,400.00
$19,440.00
$213,840.00
9
3
Restoration and
Connection Project
225mm-450mm rip -rap.
Trucking
Infrastructure
Green space
Wilket Creek
Off-site removal of
Landscaping &
$124,750.00
$12,475.00
$137,225.00
8
8
Restoration and
Rehabilitation Reach 2
stockpiled soil.
property Services
Infrastructure
2019 Equipment
Supply and delivery of
GREEN TRACTORS
Acquisitions - Restoration
$24,795.00
$2,479.50
$27,274.50
8
4
Corporate Services
one (1) flex wing mower.
INC.
Projects
2019 Equipment
Acquisition of one (1) 25
Acquisitions - Clarement
PTO HP compact utility
GREEN TRACTORS
$62,405.00
$6,240.50
$68,645.50
9
1
Corporate Services
INC. (PORT PERRY)
Field Center
tractor.
Restoration and
Pest control services for
Green Leaf Pest
$13,678.49
$3,419.62
$17,098.11
6
1
Restoration and
Infrastructure Campus
3 years.
Control Inc.
Infrastructure
Aged Pine Bark Fines
required to amend TRCA
Soil Amendment Nursery
Nursery fields to
Gro -Bark (Ontario)
$1136000
,.,.,.
$170400
$1306400
5
3
Restoration and
2019
increase organic matter,
Ltd.
Infrastructure
help lower pH, improve
overall soil structure.
NJ
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Stockpiled sediment
Toronto SWMP
Ground Force
Restoration and
hauling and disposal
$819,467.00
$122,920.05
$942,387.05
20
2
Maintenance
Environmental Inc.
Infrastructure
services.
York University SWMP
Hauling and disposal of
Groundforce
$73,881.25
$7,388.13
$81,269.38
4
1
Restoration and
Maintenance
storm pond sediments.
Environmental
Infrastructure
Automatic gate entry
HAWKINS
systems at Heart Lake
Conservation Parks
CONTRACTING
$123,863.00
$24,772.60
$148,635.60
6
3
Parks and Culture
and Petticoat Creek
SERVICES LIMITED.
Conservation Areas.
Mud Creek Reach 6 -
Rental of a by-pass
Herc Rentals
$43,300.00
$4,330.00
$47,630.00
5
2
Restoration and
Phase
pumping system.
Infrastructure
Closed circuit television
(CCTV) inspections to
document pre and post
INFRASTRUCTURE
Mimico Creek behind
Restoration and
construction conditions
INTELLIGENCE
$12,150.00
$1,215.00
$13,365.00
3
2
Ridgegate Crescent
Infrastructure
of sanitary and
SERVICES INC.
stormwater
infrastructure.
INFRASTRUCTURE
Toronto SWMP
CCTV inspection
INTELLIGENCE
$17,160.00
$1,716.00
$18,876.00
10
3
Restoration and
services.
Infrastructure
SERVICES INC.
29
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Closed circuit television
(CCN) inspections to
Patterson Creek 2019
document pre- and post-
INFRASTRUCTURE
Restoration and
INTELLIGENCE
$17,240.00
$2,170.00
$19,410.00
8
2
Erosion Control Projects
construction conditions
Infrastructure
of sanitary
SERVICES INC.
infrastructure.
Closed circuit television
(CCN) inspections to
Jennifer- Whitburn
Infrastructure
Multiuse Trail Connection
document pre-
Intelligence Services
$19,900.00
$1,990.00
$21,890.00
10
2
Restoration and
construction conditions
Infrastructure
Project
J
of stormwater and
Inc.
sanitary infrastructure.
Articulated concrete
block system to be used
Rouge National Urban
as soil stabilization for
International Erosion
$15,890.85
$1,589.09
$17,479.94
3
3
Restoration and
Park
farm vehicle access and
Control Systems Inc.
Infrastructure
multi -use trail through
small tributary.
Ivan B. Wallace
Peacham Crescent Slope
Ontario Land Surveyor
Ontario Land
$14,300.00
$1,430.00
$15,730.00
11
6
Restoration and
Stabilization Project
(OLS) services.
Infrastructure
Surveyor Ltd
Ivan B. Wallace
Bolton Berm Major
Ontario Land Surveyor
Ontario Land
$24,670.00
$2,467.00
$27,137.00
15
1
Restoration and
Maintenance Project
(OLS) services.
Infrastructure
Surveyor Ltd.
30
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Riverdale Park East Slope
Hydroseeding services.
J. Lipani Turf Group
$32,129.00
$3,212.90
$35,341.90
7
3
Restoration and
Regrading Project
Infrastructure
Labour, equipment, and
7959 Steeles Avenue
materials for renovation
Joe Pace &Sons Lts.
$14,998.40
$2,249.76
$17,248.16
6
6
Corporate Services
of two (2) full
washrooms.
Tapscott SWMP
Sediment hauling and
KGS
$134,200.00
$13,420.00
$147,620.00
11
4
Restoration and
disposal services.
Infrastructure
Terraseeding services for
Various 2019 Restoration
6 (six) sites within the
KING
$54,762.24
$8,214.34
$62,976.58
7
2
Restoration and
Projects
HYDROSEEDING INC.
Infrastructure
GTA.
Acquisition of One (1)
KOOY BROTHERS
2019 Equipment
Four Seat Off -Road
LAWN EQUIPMENT
$19,450.00
$1,945.00
$21,395.00
4
2
Corporate Services
Acquisitions
Utility Vehicle.
LTD.
2019 Equipment
Acquisition of one (1)
KOOY BROTHERS
Acquisition - Resource
tractor drawn log
LAWN EQUIPMENT
$27,210.00
$2,721.00
$29,931.00
2
1
Corporate Services
Management Projects
forwarding trailer.
LTD.
2019 Equipment
Acquisition of one (1) off
KOOY BROTHERS
Acquisition -Albion Hills
road utility vehicle with
LAWN EQUIPMENT
$41,000.00
$4,100.00
$45,100.00
4
2
Corporate Services
Conservation Area
tracks.
LTD.
General contractor for
Albion Hills Community
structural rehabilitation
KSAL General
$39,000.00
$7,800.00
$46,800.00
3
3
Corporate Services
Farm
and electrical upgrades
Contracting
to High Barn.
31
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Maintenance and
Lamoureux
Restoration Services
servicing of the Clivus
Restoration and.
Mechanical Service
$34,221.00
$5,133.15
$39,354.15
5
1
Centre
composting toilets at
Infrastructure
Ltd.
RSC.
37 and 39 Topcliff Dr., 35
and 37 Shendale Dr. and
Ontario Land Surveyor
Land Survey Group
$29 677.00
$4,451.55
$34,128.55
3
3
Restoration and
(OLS) services.
Inc.
Infrastructure
253-255 Burbank Dr.
Martin Goodman Trail at
LANDSOURCE
Restoration and
Terraseeding services.
$19,710.00
$3,942.00
$23,652.00
7
5
Baselands
ORGANIX LTD.
Infrastructure
TO Islands 2019 Flooding
Aquadams.
Layfield Canada Ltd.
$26,480.00
$2,648.00
$29,128.00
3
2
Restoration and
Infrastructure
Various 2019 Restoration
Supply and application
LEUSCHNER'S LAWN
$181056.28
,,,161.91
$18105.63
$199
6
2
Restoration and
Projects
of herbicide.
& LANDSCAPE
Infrastructure
Wagon Ride services for
March Break;
Black Creek Pioneer Village
Thanksgiving and
Lionel's Farm
$14,025.00
$1,402.50
$15,427.50
6
2
Parks and Culture
December Christmas
weekends.
Pre and post
Royal York MC06 Minor
construction CCN
M.E. Andrews &
Restoration and
$20,960.00
$2,096.00
$23,056.00
3
1
Maintenance
inspection for buried
Associates Ltd.
Infrastructure
infrastructure.
Translation English -
Education and
Monarch Nation
Marie Eve Laneville
$9,000.00
$2,250.00
$11,250.00
2
2
French.
Training
32
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Golf cart rentals for
Bathurst Glen GC
2019 and 2020
MASTERS GOLF
$51,200.00
$10,240.00
$61,440.00
5
3
Parks and Culture
operating seasons (2
CARTS
Years).
Services to repair cracks
Yonge York Mills Channel
and fill voids in the
McPherson Andrews
$56,698.00
$5,669.80
$62,367.80
16
2
Restoration and
Reach 2
Infrastructure
concrete channel.
Non -calcareous,
Bathurst Glen GC and
washed, medium
Miller Waste
$13,377.00
$1,337.70
$14,714.70
3
2
Parks and Culture
Bruce's Mill CA
gradation sand for
Systems Inc.
greens and bunkers.
Don Mills Access Trail
Tipping fees for disposal
Millwick Transfer
$9,750.00
$975.00
$10,725.00
8
8
Restoration and
of asphalt.
Station
Infrastructure
New 10'x 40' Office
Ashbridges Bay Landform
Trailer (acquired as TRCA
MOBILEASE RENTALS
$33,925.00
$0.00
$33,925.00
5
3
Restoration and
INC.
Infrastructure
asset).
TRCA's New
Fencing rental for tree
Administrative Office
protection during
MODU-LOC FENCE
$41,988.00
$4,198.80
$46,186.80
3
3
Corporate Services
Building
construction.
RENTALS
Monarch Nation Program
Supply and delivery of
Native Plants in
$10,687.50
$0.00
$10,687.50
3
3
Education and
native plants.
Claremont
Training
TRCA Nursery Program
Bare root tree & shrub
Neil Vanderkruk
$11,962.50
$2,392.50
$14,355.00
5
4
Restoration and
Spring 2019
liner stack.
Holdings Inc.
Infrastructure
White and blue paint for
Northeastern
Petticoat CA Pool
main pool and splash
Swimming Pool
$13,824.00
$1,382.40
$15,206.40
3
3
Parks and Culture
poos.
Distribution
33
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Various TRCA Restoration
Rental of timber/crane
Northern Mat
$13,100.00
$1,310.00
$14,410.00
5
2
Restoration and
Projects
mats
Infrastructure
Rental, delivery and
Northern Mat &
1025 Scarlett Road Phase
assembly of timber
Bridge Ltd.
$17,356.20
$3,471.24
$20,827.44
8
2
Restoration and
2
access mud mats for
Infrastructure
Partnership
phase 2 works.
Rental, delivery and
Northern Mat &
Riverdale Park East Slope
assembly of timber, or
Bridge Ltd.
$19,586.20
$3,917.24
$23,503.44
6
2
Restoration and
Regrading Project
equivalent, access mud
Infrastructure
Partnership
mats.
Northern Mat &
Peel Village Golf Course
Rental of access mats.
Bridge Ltd.
$38,771.56
$3,877.16
$42,648.72
8
2
Restoration and
Infrastructure
Partnership
Restoration and
Infrastructure Campus and
Dust Control floor mat
OLYMPIC DUST
$21,572.00
$3,235.80
$24,807.80
3
2
Restoration and
Kortright Centre for
service for 2 years.
CONTROL
Infrastructure
Conservation
Consulting services for
Palmer
fluvial geomorphic
McEwen Pedestrian Bridge
assessment and
Environmental
$21,995.00
$2,199.50
$24,194.50
7
3
Restoration and
Replacement
Consulting Group
Infrastructure
geotechnical
Inc.
investigation.
Community
Partners in Project Green
Facility rental.
Pearson Convention
$13,342.88
$1,334.29
$14,677.17
3
3
Engagement and
2019 Fall Forum
Centre
Outreach
TRCA Nursery Program
Purchase of bare root
PINENEEDLE FARMS
$27,594.50
$5,518.90
$33,113.40
5
4
Restoration and
Spring 2019
tree & shrub liner stack.
Infrastructure
34
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Electrical contracting
101 Exchange Ave.
services to modify
Plan Group Inc.
$10,500.00
$2,100.00
$12,600.00
3
3
Corporate Services
Building
existing generator loads.
Hydro service
PLATINUM
Glen Haffy Conservation
replacement for Glen
ELECTRICAL
$299,095.00
$59,819.00
$358,914.00
5
S
Corporate Services
Area
Haffy Conservation Area.
CONTRACTORS INC.
Labour, equipment and
materials for renovation
7831 14th Ave.
of two (2) washrooms
Prompt Builders Inc.
$15,200.00
$2,280.00
$17,480.00
8
8
Corporate Services
and kitchen ceiling
repairs.
Pyrotechnics for the
Caledon Canada Day 2019
23rd annual Caledon
Pyroworld
$12,975.56
$1,297.56
$14,273.12
4
1
Parks and Culture
Canada Day event.
Supply and delivery of
Cover Crop for Restoration
cover crop mixes for
QUALITY SEEDS LTD.
$9,207.00
$920.70
$10,127.70
3
3
Restoration and
Sites
various restoration
Infrastructure
projects.
equipment and
BeaucLabour,
urt Road (12-30)
Major Maintenance
Major
materials necessary to
R & M
$818313.00
,,,975.60
$163662.60
$981
5
4
Restoration and
repair a TRCA-owned
CONSTRUCTION
Infrastructure
Project
retaining wall.
Humber Marshes Osprey
Installation of pole and
RBJMachine
$11,090.00
$1,109.00
$12,199.00
3
1
Restoration and
Nesting Structure
platform.
Infrastructure
Spring Planting 2019
Deer fencing.
Roma Fence
$17,055.00
$1,705.50
$18,760.50
4
2
Restoration and
Infrastructure
35
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Supply of native grass
RURAL LAMBTON
Claireville Highway 50
and forb seed and seed
STEWARDSHIP
$15,200.00
$1,520.00
$16,720.00
7
1
Restoration and
Meadow Restoration
Infrastructure
drilling services.
NETWORK
RURAL LAMBTON
Various 2019 Restoration
Native seed.
STEWARDSHIP
$17,684.32
$1,768.43
$19,452.75
4
3
Restoration and
Projects
Infrastructure
NETWORK
2019 Vehicle Acquisitions -
Corporate Services Pooled
Acquisition of three (3)
SCARBOROUGH
$87.802.50
$8,780.25
$96,582.75
3
2
Corporate Services
compact hybrid sedans.
TOYOTA
Resources
Trout fish feed for Glen
Glen Haffy 2019-2021
Haffy Conservation Area
Sharpe Farm
$63,180.00
$6,318.00
$69,498.00
3
3
Parks and Culture
Supplies Ltd.
fish hatchery.
TRCA 2019 Nursery
Bare root tree & shrub
SHERIDAN
$12,975.00
$2,595.00
$15,570.00
5
4
Restoration and
Program
liner stock.
NURSERIES
Infrastructure
Various items for resale
Indian Line Campground
at the snack bar and
STEWART
$15,571.61
$1,557.16
$17,128.77
3
1
Parks and Culture
and Albion Hills 2019
FOODSERVICE INC.
camp store.
Purchase of new, fully
assembled, heavy duty -
Various Restoration
hemlock, fir or
Sturgeon Falls Brush
$25,200.00
$2,520.00
$27,720.00
7
4
Restoration and
Projects
Infrastructure
hardwood 4 ft wide
Crane Mats.
Duffins Creek
Snow plowing and
T.H.FORSYTHE
Education and
Environmental Education
salt/sand application of
$9,500.00
$2,375.00
$11,875.00
7
7
HAULAGE LTD
Training
Centre
interior road.
36
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Jennifer- Whitburn for
ScourStop transition
TERRAFIX
$17,848.20
$1,784.82
$19,633.02
2
1
Restoration and
Swale Restoration
mats.
GEOSYNTHETICS INC.
Infrastructure
Bentonite (Geosynthetic
Franklin Pond
Clay) Liner for the
TERRAFIX
$28,625.00
$2,862.50
$31,487.50
4
4
Restoration and
GEOSYNTHETICS INC.
Infrastructure
Franklin Garden Pond.
Supply and Delivery of
Restoration and
biodegradable and net
TERRAFIX
$91,800.00
$9,180.00
$100,980.00
4
2
Restoration and
Engineering Projects 2019
free erosion control
GEOSYNTHETICS INC.
Infrastructure
blankets.
Supply and delivery of
One (1) Class 2 Truck
2019 Vehicle Rentals -
Environmental Monitoring
and Two (2) Class 1
THOMAS SOLUTIONS
$11,055.00
$1,105.50
$12,160.50
3
3
Corporate Services
Trucks for a period for a
and Data Management
rental period of 5
months.
2019 Vehicle Rentals -
Supply and delivery of
Erosion Hazard Monitoring
short term rental
THOMAS SOLUTIONS
$17,520.00
$1,752.00
$19,272.00
3
3
Corporate Services
Program
vehicles.
Supply of short term
rental vehicles to assist
Meadoway Project
with the transportation
THOMAS SOLUTIONS
$18,000.00
$1,800.00
$19,800.00
3
3
Corporate Services
Restoration
of supplies and
materials.
2019 Vehicle Rental -
Etobicoke Mimico
Supply of two (2) short
THOMAS SOLUTIONS
$18,236.00
$1,823.60
$20,059.60
3
3
Corporate Services
term rental vehicles.
Watershed
37
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
2019 Vehicle Rentals -
Resource Management
Supply of short term
THOMAS SOLUTIONS
$19,632.00
$2,195.00
$21,827.00
3
3
Corporate Services
rental vehicles.
Projects
Rental of seven (7)
compact passenger cars
2019 Vehicle Rentals -
for Environmental
Environmental Monitoring
Monitoring and Data
THOMAS SOLUTIONS
$20,965.00
$2,096.50
$23,061.50
3
3
Corporate Services
and Data Management
Management (EMDM)
Terrestrial Inventories &
Monitoring (TIM).
ThyssenKrupp
Black Creek Pioneer Village
Elevator Maintenance
Elevator (Canada)
$20,197.80
$4,039.56
$24,237.36
4
1
Parks and Culture
2019-2021.
Limited
TMI Contracting and
Riverdale Park East
Supply and delivery of
Equipment Rental
$79,200.00
$0.00
$79,200.00
6
3
Restoration and
top soil.
Infrastructure
Ltd.
14555 Humber Station Rd.
Roofing services for roof
Tony K Roofing Inc.
$10,500.00
$1,260.00
$11,760.00
6
2
Corporate Services
and eaves replacement.
Roofing services for
8940 a tle
eaves trough
Tony K. Roofing
$12,500.00
$1,250.00
$13,750.00
2
2
Corporate Services
Conservation Road
ion
replacement.
Eaves cleaning, eaves re-
TRCA Residential Rentals
fastening and gutter
Tony K. Roofing
$42,000.00
$4,200.00
$46,200.00
2
2
Corporate Services
cover installation
services.
38
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
2661 16th Sideroad
Roofing services.
Tony K. Roofing Inc.
$11,400.00
$1,368.00
$12,768.00
5
2
Corporate Services
Consulting services for
Markham Thermal
engineering drawings
Urbantech
$20,000.00
$4,000.00
$24,000.00
6
3
Education and
Mitigation Design
and construction
Training
administration.
TRCA 2019 Fall Planting
Various species of
UXBRIDGE
$10,195.00
$1,019.50
$11,214.50
3
3
Restoration and
Program
Caliper trees.
NURSERIES LIMITED
Infrastructure
TRCA's New
Kitchen/food service
Administrative Office
design services fora
Van Veezen &
$12,750.00
$2,550.00
$15,300.00
15
1
Corporate Services
Radchenko
Building
small cafeteria.
Black Creek Pioneer Village
Siding and facade
VEMA CORP
$88,700.00
$8,870.00
$97,570.00
3
2
Corporate Services
retrofit.
Maple Syrup Festival
Maple syrup products
Voisin's Maple
$16,500.00
$1,650.00
$18,150.00
1
1
Parks and Culture
for resale.
Products
Paving and restoration
Peel Village Golf Course
of a section of the
Vox Construction
$18,260.00
$1,826.00
$20,086.00
3
3
Restoration and
Infrastructure
parking lot.
Plastic Wristbands for
Aquatic Facilities - 2019
use at 3 TRCA Aquatic
Wristband Resources
$13,240.00
$2,648.00
$15,888.00
5
2
Parks and Culture
Facilities.
39
Attachment 1 - Summary of Procurements
Lowest Bid
Goods/Services
Contingency
Total Cost (Before
Total
RespondedTRCA
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Limited
Responded
Procured
Cost
Revisions)
vendors
(Responsible)
TheMeadoway-
ESET Secure Business 1
Tendering
Applicable)
Year Renewal - Endpoint
Perkins + Will
$245,975.00
$0.00
$245,975.00
12
12
Corporate Services
Endpoint Antivirus(ESET)
Security/Antivirus for
Xylotek Solutions Inc.
$11,232.00
$0.00
$11,232.00
2
2
Corporate Services
License Renewal
Windows workstations,
Andrews Engineer
$31,500.00
$3,150.00
$34,650.00
(d)
N/A
Restoration and
servers and android
Infrastructure
Emergency Works
devices.
TRCA's New
Demolition services
Administrative Office
required for the existing
York Demolition
$44,818.00
$4,481.80
$49,299.80
3
3
Corporate Services
Building
portable buildings.
Corp.
Not Highest Ranked
Goods/Services
Contingency
Total Cost (Before
Total
RespondedTRCA
TRCA Division
Project Name
Awarded Bidder
Contract Cost
Limited
Responded
Procured
Cost
Revisions)
vendors
(Responsible)
TheMeadoway-
Professional landscape
Tendering
Applicable)
design services for
Perkins + Will
$245,975.00
$0.00
$245,975.00
12
12
Corporate Services
Visualization Toolkit
Summerhill Gardens
development of a
Andrews Engineer
$31,500.00
$3,150.00
$34,650.00
(d)
N/A
Restoration and
visualization toolkit.
Infrastructure
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Awarded Bidder
Contract Cost
Limited
(Not
Procured
Cost
Revisions)
(Responsible)
Tendering
Applicable)
Pre and post
Yellow Creek Below
Summerhill Gardens
construction CCN
Andrews Engineer
$31,500.00
$3,150.00
$34,650.00
(d)
N/A
Restoration and
inspection and pipe
Infrastructure
Emergency Works
condition report.
Rue
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Pre and post
Peel Village Golf Course
construction CCN
Restoration and
Sanitary Infrastructure
inspections of two
Andrews. Engineer
$21,841.77
$3,276.27
$25,118.04
(c) (i)
N/A
Protection Project
parallel 1050 mm
Infrastructure
diameter sanitary mains.
2019 Acquisition -Toronto
Acquisition of two (2) six
AQUATECH
DEWATERING
$198,951.34
$19,895.13
$218,846.47
(a) (ii)
N/A
Corporate Services
Islands
inch diesel trash pumps.
COMPANY INC.
Hydrometric and Flood
Cloud based software
Aquatic Informatics
$20,335.34
$2,033.53
$22,368.87
(b) (v)
N/A
Development and
Warning System
suite.
Inc.
Engineering Services
Maintenance inspection
RSC Building Automation
services of building
Automated Logic-
$16,096.00
$4,024.00
$20,120.00
(b) (v)
N/A
Restoration and
System
automation system
Canada Ltd
Infrastructure
(BAS).
Renewal of Engagement
Community Engagement
HQ community
Bang The Table LLC
$20,500.00
$2,050.00
$22,550.00
(b)(ii)
N/A
Watershed
Software
engagement software
Strategies
license.
41
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Purchase of Voice Over
Internet Protocol(VoIP)
Earth Rangers Building
equipment,
BELL CANADA
$17,271.60
$3,454.32
$20,725.92
(C) (i)
N/A
Corporate Services
programming, licensing,
and maintenance.
Conservation Parks
Traffic Ads on Virgin
Bell Media Radio GP
$14,850.00
$0.00
$14,850.00
(b) (iii)
N/A
Corporate Services
Advertising
Radio Station.
Plumbing services for
Heart Lake CA
relocation of pool filter
BEOTHUK
$17,848.05
$1,784.81
$19,632.86
(b) (vi)
N/A
Corporate Services
PVC supply line.
Natural playground
Kortright Nature School
elements - loose parts,
Bienenstock Natural
$10,593.85
$529.69
$11,123.54
(b) (iii)
N/A
Education and
wacky posts, and log
Playgrounds
Training
tunnel.
Digital billboard at
Branded Cities
2019 Kortright Billboards
Bathurst St. and
$10,475.00
$0.00
$10,475.00
(b) (iii)
N/A
Corporate Services
Rutherford Rd.
Company Canada
Chlorine gas cylinders
Albion Hills CA
for swimming pool
BRENNTAG CANADA
$12,000.00
$600.00
$12,600.00
(b) (iii)
N/A
Parks and Culture
water chemistry.
INC.
42
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Awarded Bidder
Contract Cost
Limited
(Not
Procured
Cost
Revisions)
(Responsible)
Tendering
Applicable)
Restoration Services
Three year mechanical
BRUNO PLUMBING &
$23,886.16
$4,777.23
$28,663.39
(c) (ii)
N/A
Restoration and
Centre Building
maintenance services.
CONTRACTING INC.
Infrastructure
Emergency engineering
design and contract
Indian Line Campground
administration services
CALDER
$35,000.00
$7,000.00
$42,000.00
(d)
N/A
Corporate Services
Dump Station
for failure of
ENGINEERING LTD.
submersible pump.
Database management
Fish Telemetry Database
for fish acoustic
CARLETON
$20,000.00
$0.00
$20,000.00
(b) (iii)
N/A
Restoration and
UNIVERSITY
Infrastructure
telemetry study.
Supply and delivery of
two (2) new dual wand
charging stations and
2017-2019 Electric Vehicle
one(1)extra year of
CHARGEPOINT
$9,580.00
$958.00
$10,538.00
(b)(v)
N/A
Corporate Services
Charging Station
Software as a Service
(SaS) cloud based
subscription.
Media Services
Renewal of Cision media
Cision Canada Inc.
$16,590.00
$0.00
$16,590.00
(c) (i)
N/A
Corporate Services
services.
43
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Awarded Bidder
Contract Cost
Limited
(Not
Procured
Cost
Revisions)
(Responsible)
Tendering
Applicable)
Admission fee for TRCA
Latornell Symposium
staff across multiple
p
Conservation Ontario
$ 11,000.00
$ 0.00
$ 11,000.00
b iii
() (iii)
N/A
Education and
divisions.
Training
Confrontation
Erosion Risk Management
management and
Control Institute
$10,350.00
$1,035.00
$11,385.00
(b) (iii)
N/A
Restoration and
Staff Training
conflict resolution
Infrastructure
training services.
Canoes for Paddle the
COWAN CANOE
Community
Paddle the Don 2019
$9,550.00
$1,432.50
$10,982.50
(b) (iii)
N/A
Engagement and
Don.
KAYAK LIVERY
Outreach
Paid Advertising - Parks
CP24 ads to promote
CP24 - A DIVISION OF
$26,460.00
$0.00
$26,460.00
(b) (iii)
N/A
Corporate Services
and Culture
park activities.
BELL MEDIA INC.
Paid Advertising - Parks
2020 Parks campaign -
CP24 - A DIVISION OF
$28,728.00
$0.00
$28,728.00
(b) (iii)
N/A
Corporate Services
and Culture
Traffic ads on CP24.
BELL MEDIA INC.
Durham Regional Police
Petticoat Creek CA
Services for 2019
DURHAM REGIONAL
$24,992.83
$2,499.28
$27,492.11
(b) (iv)
N/A
Parks and Culture
POLICE SERVICE
operating season.
44
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Awarded Bidder
Contract Cost
Limited
(Not
Procured
Cost
Revisions)
(Responsible)
Tendering
Applicable)
Environics Data Access
Renewal of Environics
Environics Analytics
$90,000.00
$0.00
$90,000.00
(c) (i)
N/A
Corporate Services
data access for 3 years.
Inc
Four (4) EP 1990-IPE-P-A-
Jennifer- Whitburn Multi-
R surface mounted
Equiparc
$11,423.00
$1,142.30
$12,565.30
(c) (i)
N/A
Restoration and
use Trail
bench with backrest and
Infrastructure
armrests.
Board meeting
Minutes and Agendas
management solution
eSCRIBE Software
$23,062.50
$0.00
$23,062.50
(b) (ii)
N/A
Corporate Services
System
Ltd
for a term of 3 years.
Assessment for
2019 Pay Equity Audit and
supplementary
Gallagher
$12,378.00
$1,237.80
$13,615.80
(c) (i)
N/A
Human Resources
Assessment
employee group.
Supply and delivery of
Kortright Gift Shop
wholesale gifts and
Gift Craft
$13,000.00
$1,300.00
$14,300.00
(b) (iii)
N/A
Education and
souvenir items for
Training
resale.
TRCA New Administrative
Additional soil testing
GOLDER ASSOCIATES
$8,910.00
$1,782.00
$10,692.00
(c) (ii)
N/A
Corporate Services
Office Building
services.
LTD
45
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Services to further
LID Treatment Train Tool -
enhance and develop
Golder Associates
$38,680.00
$7,736.00
$46,416.00
(c) (i)
N/A
Policy and Planning
Version 2 - Phase 2
hydrological modelling
Ltd
software.
The supply and delivery
BCPV Gift Shop
of prepackaged food
GOODIVARK FOOD
$22,000.00
$2,200.00
$24,200.00
(b) (iii)
N/A
Parks and Culture
service items for resale.
INC.
Patterson Richvale
Professional engineering
Sanitary Infrastructure
construction support
GRECK &
$26,500.00
$2,650.00
$29,150.00
(b) (v)
N/A
Restoration and
Protection and Valleylands
ASSOCIATES LTD.
Infrastructure
Erosion Control
services.
TRCA Real Time Stream
Three Sutron 92108 Mite
HOSKIN SCIENTIFIC
$10,923.00
$546.15
$11,469.15
(b) (iii)
N/A
Restoration and
Gauge Network
dataloggers.
LTD.
Infrastructure
Two Ott Pluvio2
Carruthers Flood
precipitation gauges,
HOSKIN SCIENTIFIC
Development and
two Sutron 9210
$22,118.00
$2,211.80
$24,329.80
(b) (v)
N/A
Forecasting and Warning
LTD.
Engineering Services
Dataloggers, and
mounting hardware.
M.
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Supply and delivery of
boat mounted
2019 Equipment
electrofishing
HOSKIN SCIENTIFIC
Acquisition - Compact (14')
$27,714.00
$2,771.40
$30,485.40
(c) (i)
N/A
Corporate Services
Electrofishing Boat
components fora
LTD.
compact (14')
electrofishing boat.
Supply and delivery of
2020 Equipment
boat mounted
HOSKIN SCIENTIFIC
Acquisition -Electrofishing
electrofishing
LTD.
$31,583.00
$3,158.30
$34,741.30
(c) (i)
N/A
Corporate Services
Components
components.
Radio telemetered
G. Ross Lord Dam
water level sensors to
HOSKIN SCIENTIFIC
$41,645.00
$0.00
$41,645.00
(b) (iii)
N/A
Restoration and
monitor pressure relief
LTD.
Infrastructure
wells and piezometers.
Hydro One pole
Bolton Camp
relocation work at
HYDRO ONE
$12,251.77
$1,225.18
$13,476.95
(b) (iv)
N/A
Corporate Services
Bolton Camp.
NETWORKS INC.
Glen Haffy Hydro Upgrade
Hydro One services for
HYDRO ONE
$13,995.42
$1,399.54
$15,394.96
(b) (iv)
N/A
Corporate Services
hydro upgrade.
NETWORKS INC.
47
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Electrical services from
Bolton Camp
Hydro One to move and
HYDRO ONE
$79,723.32
$7,972.33
$87,695.65
(b) (iv)
N/A
Corporate Services
replace electrical poles.
NETWORKS INC.
24 Acoustic Telemetry
Toronto Harbour
Fish Transmitters, 60
Innova5ea Marine
$20,874.00
$2,087.40
$22,961.40
(b) (v)
N/A
Restoration and
Telemetry Study
Systems Canada Inc.
Infrastructure
receiver batteries.
Canada Goose
Canada Goose
INTEGRATED GOOSE
Management Program
Management Relocation
MANAGEMENT
$22,500.00
$2,250.00
$24,750.00
(c) (i)
N/A
Restoration and
Infrastructure
2019
Services.
SERVICES
TreeAzin systemic
Lallemand
Restoration and
TRCA Forestry Program
herbicide application
$13,405.60
$2,010.84
$15,416.44
(b) (iii)
N/A
Inc/BIOFOREST
Infrastructure
and supplies.
Jennifer Court - Whitburn
Crescent Multi -use Trail
Cedar post and paddle
Lanark Cedar
$50,000.00
$0.00
$50,000.00
(b) (iii)
N/A
Restoration and
fencing material.
Infrastructure
Connection Project
Eight Equiparc benches
Don Mills Access Trail
for the multiple seating
Maglin Site Furniture
$12,335.00
$1,233.50
$13,568.50
(b) (v)
N/A
Restoration and.
Project
areas incorporated into
Infrastructure
the trail head design.
fJ
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
HR Research and
HR Research and Advisory
Advisory services to
McLean &Company
$18,960.00
$1,896.00
$20,856.00
(b) (iii)
N/A
Human Resources
services
improve HR
performance.
Commercial vehicle
licensing package for all
2019 Commercial Vehicle
Toronto and Region
MINISTER OF
$23,29L25
$0.00
$23,291.25
(b) (iv)
N/A
Corporate Services
Registration
Conservation Authority
FINANCE
(TRCA) commercial
vehicles.
Mitacs Accelerate
Internship for project
Mitacs Inc.
$50,000.00
$0.00
$50,000.00
(b) (iii)
N/A
Policy and Planning
Program: Thermal Imaging
support.
Mitacs Accelerate
Program: The tributary-
Postdoctoral fellow
Ontario Tech
Community
,..,.00
$2500000
$000
$25000
(b) (iii)
N/A
Engagement and
coastal wetland nexus in
project support.
University
Outreach
Durham Region
New fire pump
Kortright Visitor Centre
controller for the fire
Onyx -Fire Protection
$9,365.00
$1,873.00
$11,238.00
(d)
N/A
Education and
sprinkler system.
Services Inc.
Training
W
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Black Creek Pioneer Village
TTC subway ads.
PATTISON OUTDOOR
$19,608.00
$0.00
$19,608.00
(b) (iii)
N/A
Corporate Services
ADVERTISING LP
Wilket Creek
Rehabilitation Project
Rental of a by-pass
RAIN FOR RENT
$13,372.40
$2,005.86
$15,378.26
(c) (i)
N/A
Restoration and
Reach 2
pumping system.
CANADA ULC
Infrastructure
Three In -Situ LevelTroll
500 pressure
transducers with 50'
sensor cables, two non-
TRCA Stream Gauge
vented LevelTroll400
RICE ENGINEERING &
$10,575.78
$528.79
$11,104.57
(b) (iii)
N/A
Restoration and
Network
OPERATING LTD.
Infrastructure
pressure transducers
and two BaroTroll
barometric pressure
sensors.
Lake Ontario Contaminant
Replacement In -Situ AT-
RICE ENGINEERING &
$11,093.94
$1,109.39
$12,203.33
(b) (v)
N/A
Restoration and
Load Study
600 water quality sonde.
OPERATING LTD.
Infrastructure
4 AT600 sondes for
Erosion Risk Management
monitoring water
Rice Resource
$40,621.27
$4,062.13
$44,683.40
(b)(v)
N/A
Restoration and
Projects
Technologies Inc.
Infrastructure
turbidity.
50
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Electronic Records
Renewal of the
Management Software
Laserfiche Software
Ricoh Canada Inc.
$26,038.00
$0.00
$26,038.00
(b) (ii)
N/A
Corporate Services
(Laserfiche)
Assurance Plan (LSAP).
Cocofibre pot liners to
facilitate production of
TRCA Planting Program
2019 crop of aquatic
S.L. NATURAL FIBRE
$17,089.00
$3,417.80
$20,506.80
(b) (iii)
N/A
Restoration and
PRODUCTS INC.
Infrastructure
plants and willow
bioplugs.
Landscape design and
East Don Trail Project
contract administration
SCHOLLEN &
$43,981.00
$8,796.20
$52,777.20
(c) (i)
N/A
Corporate Services
COMPANY INC.
services.
TRCA Corporate Website
Professional website
Simalam Media Inc.
$25,000.00
$0.00
$25,000.00
(c) (i)
N/A
Corporate Services
maintenance services.
TRCA Gauging Website
Renewal of maintenance
Simalam Media Inc.
$28,800.00
$2,880.00
$31,680.00
(b) (v)
N/A
Development and
services for 3 years.
Engineering Services
51
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Engineering services for
assessment and
Albion Hills Conservation
conditions survey of all
STEPHENSON
$68,500.00
$13,700.00
$82,200.00
(c) (i)
N/A
Corporate Services
Area
services and utilities
ENGINEERING LTD.
supporting the existing
structures.
Incineration of invasive
Stericylce
Tommy Thompson Park
species (Phragmites
Environmental
$9,350.40
$935.04
$10,285.44
(b) (iii)
N/A
Restoration and
Infrastructure
australis) stems.
Solutions
Real Time Flood Warning
Cellular IP services.
TELUS
$25,000.00
$0.00
$25,000.00
(c) (i)
N/A
Development and
Gauge Network
Engineering Services
23 Brixham Terrace
Supply and delivery of
TERRAFIX
$42,224.00
$4,222.40
$46,446.40
(b) (ii)
N/A
Restoration and
Flexamat Plus material.
GEOSYNTHETICS INC.Infrastructure
Engineering services for
Yellow Creek Below
peer review of design
Summerhill Gardens
drawings and
TERRAPROBE INC.
$18,470.00
$2,600.00
$21,070.00
(c) (i)
N/A
Restoration and
Infrastructure
Emergency Works
engineering support
during construction.
52
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Tendering
Applicable)
Confrontation
Conflict Resolution
management and
THE CONTROL
$9,250.00
$925.00
$10,175.00
(b) (iii)
N/A
Development and
Training
conflict resolution
INSTITUTE INC.
Engineering Services
training services.
Supply, delivery, and
2019 Equipment
installation of one (1)
THE SHOP
Acquisition -Albion Hills
$16,362.50
$1,636.25
$17,998.75
(b) (iii)
N/A
Corporate Services
cross country ski trail
INDUSTRIAL
Conservation Area
groomer.
Structural engineering
Black Creek Pioneer Village
review of Town Hall
Thornton Tomasetti
$9,900.00
$1,980.00
$11,880.00
(d)
N/A
Corporate Services
Canada Inc.
Drive Shed for repairs.
2019 Equipment
Acquisition of one (1)
TIMM ENTERPRISES
Acquisitions - Resource
$16,979.00
$1,697.90
$18,676.90
(b) (iii)
N/A
Corporate Services
new seed bed lifter.
LTD.
Management Projects
TRCA's New
Administrative Office
New hydro service
TORONTO HYDRO
$10,000.00
$1,000.00
$11,000.00
(b) (iv)
N/A
Corporate Services
installation.
ELECTRIC SYSTEM
Building
53
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Awarded Bidder
Contract Cost
Limited
(Not
Procured
Cost
Revisions)
(Responsible)
Tendering
Applicable)
Glen Rouge Campground
2019 Toronto Police
TORONTO POLICE
$21,425.40
$2,142.54
$23,567.94
(b) (iv)
N/A
Parks and Culture
Services.
SERVICES
Mitacs Accelerate
Program: Disentangling
Effects of Multiple
Postdoctoral fellow
University of
Community
Stressors on Nuisance
$50,000.00
$0.00
$50,000.00
(b) (iii)
N/A
Engagement and
Benthic Algae
project support services.
Windsor
Outreach
(Cladophora)in Nearshore
Regions of the Great Lakes
Kortright Centre Glass
Emergency repair
VEMA CORP
$45,000.00
$6,750.00
$51,750.00
(d)
N/A
Corporate Services
House
services.
Emergency electrical
Black Creek Pioneer Village
contracting services torestore
Vitall Inc.
$34,500.00
$5,175.00
$39,675.00
(c) (ii)
N/A
Corporate Services
powerline and
reconnect power.
Emergency electrical
Petticoat Creek CA
services for installation
Vitall Inc.
$60,500.00
$9,075.00
$69,575.00
(d)
N/A
Corporate Services
of new High Voltage line
between S2 and S6.
54
Attachment 1 - Summary of Procurements
Limited Tendering
Goods/Services
Contingency
Total Cost (Before
Criteria for
RespondedTRCA
Division
Project Name
Procured
Awarded Bidder
Contract Cost
Cost
Revisions)
Limited
(Not
(Responsible)
Procured
Cost
Revisions)
(Responsible)
Snow Removal Services
management services
AAA Landscaping; Ivy
$170,000.00
$17,000.00
$187,000.00
Tendering
Applicable)
Corporate Services
Kortright Centre for
Maple syrup products
Voisin's Maple
$27,000.00
$2,700.00
$29,700.00
(b) (iii)
N/A
Education and
Conservation Giftshop
for resale.
Products Ltd.
Outreach Division
Vendor of Record Arrangements
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Procured
Awarded Bidders
Contract Cost
Cost
Revisions)
Vendors
Responded
(Responsible)
Snow removal and ice
Snow Removal Services
management services
AAA Landscaping; Ivy
$170,000.00
$17,000.00
$187,000.00
3
2
Corporate Services
2019-2020
for various TRCA
Property Services
properties.
Emergency Response,
Emergency spills
Clean-up and Disposal of
response and hazardous
Accuworx Inc.; QM
$200,000.00
$20,000.00
$220,000.00
3
2
Corporate Services
Spills and Hazardous
waste disposal services.
LP
Materials
Allsteel; Ergo
Supply, delivery and
Industrial Seating
Office Seating
installation of office
Systems; Global
$9,999.00
$0.00
$9,999.00
5
5
Corporate Services
seating and furniture.
Upholstery Co Inc.;
Haworth Inc.;
Teknion Ltd.
Supply and delivery of
Dyed Diesel
dyed diesel to fuel
Alpha OilRestoration
$134,498.00
$0.00
$134,498.00
1
1
and
equipment on TRCA
Infrastructure
projects.
55
Attachment 1 - Summary of Procurements
Vendor of Record Arrangements
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidders
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Development of
conceptual and detailed
Master Detailed Designs
designs for multiple
for City of Toronto Major
TRCA-owned erosion
Aquafor Beech Ltd.;
$163,329.00
$16,332.90
$179,661.90
74
2
Restoration and
Geo Morphix Ltd.
Infrastructure
Maintenance Projects
control structures
throughout the City of
Toronto.
Centennial
Sweeping and Flusher
Sweeping and flusher
Construction and
$135,195.00
$0.00
$135,195.00
11
1
Restoration. and.
Truck Services
truck services.
Infrastructure
Equipment Rentals
Cha ntlers
Rental of portable toilets
Environmental
Rental of Portable Toilets
for TRCA projects,
Services Ltd.;
$149,640.00
$0.00
$149,640.00
10
2
Restoration and
events and parks
Infrastructure
Portable Toilet
facilities.
Rentals Inc.
Cliffords Haulage
Ltd.; Glenn Windrem
Supply and delivery of
Supply and Delivery of Top
screen and stockpiled
Trucking; J Jenkins
00
$106,785..00
$0
$106,785.00
l0
5
Restoration and
Soil
and Son Landscape
Infrastructure
topsoil.
Contractors Ltd.;
Earthco Soil Mixtures
Rental of steel road
Rental of Steel Road Plates
plates for TRCA
Cos Shore Inc.;
$45,505.00
$0.00
$45,505.00
8
2
Restoration and
construction and
Superior Disposal
Infrastructure
restoration projects.
Devron Sales Ltd.;
Supply and delivery of
Erosion and Sediment
erosion and sediment
Organic Express;
$500,000.00
$0.00
$500,000.00
22
3
Restoration and
Control Materials
Armtec-Canada
Infrastructure
control materials.
Culvert
56
Attachment 1 - Summary of Procurements
Vendor of Record Arrangements
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidders
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Draglam Waste &
Recycling; Public
Construction Waste
Construction waste
Disposal and
$90,200.00
$0.00
$90,200.00
25
5
Restoration and
Disposal
disposal services.
Recycling Inc.; GFL
Infrastructure
Environmental Inc.;
Superior Disposal
Glenn Windrem
Trucking; James Dick
Supply and delivery of
Aggregate Materials
various aggregate
Construction Ltd.;
$4,000,000.00
$0.00
$4,000,000.00
23
5
Restoration and
Dufferin Aggregates;
Infrastructure
materials.
1C Rock Ltd.; Elite
Stone Quarries
Rental of construction
Modu-loc Fence
Rental of Construction
fencing (including
Rentals; Sunbelt
Restoration and
$124,000.00
$0.00
$124,000.00
9
2
Fence
delivery/setup and tear
Rentals of Canada
Infrastructure
down/pickup).
Inc.
Designated Substance and
Peritus
Professional services for
Environmental;
Hazardous Material
designated substance
Maple
$90,000.00
$9,000.00
$99,000.00
14
3
Corporate Services
Surveys, Abatement and
Disposal
surveys.
Environmental; OHE
Consultants
Sartor Environmental
Rental of operated
Group Inc.; Dynex
heavy construction
Construction Inc.;
Operated Heavy
equipment and dump
Valefield Contracting
$5,000,000.00
$0.00
$5,000,000.00
6
5
Restoration and
Construction Equipment
Inc.; TMI Contracting
Infrastructure
trucks for various TRCA
and Equipment
projects.
Rental Ltd.; Trisan
Construction
57
Attachment 1 - Summary of Procurements
Vendor of Record Arrangements
Goods/Services
Contingency
Total Cost (Before
Total
TRCA Division
Project Name
Awarded Bidders
Contract Cost
Responded
Procured
Cost
Revisions)
Vendors
(Responsible)
Rental of mobile offices
Sunbelt Rentals of
Rental of Storage
and steel storage
Canada Inc.; Mobile
Restoration and
Containers and Office
containers for
Mini Canada;
$34,250.00
$0.00
$34,250.00
14
3
Infrastructure
Trailers
construction and
Williams Scotsman
restoration projects.
Inc.
Trinity Consultants
Consulting services for
Phase 1 Environmental
Phase 1 environmental
Ontario Inc.; PGL
$240,000.00
$0.00
$240,000.00
63
2
Corporate Services
Site Assessment
Environmental
site assessments.
Consultants
Supply and delivery of
Water & Ice North
Supply of Pool Chemicals
pool chemicals for Parks
America Inc.; SP&S;
$95,830.08
$9,583.01
$105,413.09
3
3
Parks and Culture
facilities.
Glen Chemicals
TOTALS $42,435,682.29 $3,956,416.07 $46,392,098.36
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp ()
Approved %
pp ( )
Used $
()
Used %)
(
Start Date
End Date
Provincial Flood Forecasting and
Booking of facility, including
2012111 Ont Inc O/A
Pearson Convention
$4,862.20
$972.44
20%
9/27/2019
$2,145.00
$0.00
0%
8/8/2019
9/18/2019
Warning Workshop 2019
catering services.
Center
EA planning and engineering
12/10/2019
$2,857.00
$2,857.00
4%
Downtown Brampton Flood
services for Phase 1 - 4 of the
AECOM
$248,570.00
$74,661.00
30%
7/23/2018
3/31/2020
10/4/2019
$5,700.00
$5,700.00
8%
Protection EA
Municipal Class EA.
3/15/2019
$13,288.00
$13,288.00
18%
Engineering services for slope
stability, erosion risk
11/4/2019
$1,500.00
$1,500.00
7%
Eldorado Court, Grandravine Drive
assessment, and conceptual
AECOM CANADA LTD.
$225,489.00
$22,548.90
10%
10/1/2019
12/31/2020
and Ladyshot Crescent
design alternatives for forty-
12/19/2019
$5,105.00
$5,105.00
23%
five (45) properties.
11/20/2018
$6,226.00
$6,226.00
14%
Eastern & Broadview Flood
Professional engineering
AECOM CANADA LTD.
3/9/2018
$7,997.00
$7,997.00
18%
Protection Project Class EA
services for hydraulic modelling
C/O T10002C
$88 ,404.42
$44,202.21
50%
9/20/2017
6/30/2019
1/21/2019
$22,977.00
$22,977.00
52%
and design services.
9/17/2018
$4,928.00
$4,928.00
11%
Green Cleaning Services
Green cleaning services for the
Allcare Maintenance
$33,480.00
$3,348.00
10%
9/9/2019
$34,533.00
$3,348.00
100%
9/5/2017
10/31/2020
Boyd Centre.
Services Inc.
6/11/2018
$34,150.00
$0.00
0%
6/11/2018
$26,316.00
$0.00
0%
Green Cleaning Services
Green cleaning services for the
Allcare Maintenance
$18,900.00
$1,890.00
10%
10/1/2017
10/31/2020
7/10/2019
$26,842.00
$0.00
0%
Restoration Services Centre.
Services Inc.
11/17/2017
$6,900.00
$0.00
0%
Green Cleaning Services for the
2/11/2018
$20,747.00
$0.00
0%
Green Cleaning Services
Swan Lake Centre for
Allcare Maintenance
$20,340.00
$4,068.00
20%
9/30/2017
10/31/2020
Innovation and Conservation.
Services Inc.
2019 7 10
/ /
$21,162.00
$0.00
0%
Professional engineering
Wiley Bridge
services for design and contract
AMTEC Engineering
$36,325.00
$5,448.75
15%
9/5/2019
$5,500.00
$5,449.00
100%
2/6/2019
11/25/2019
administration.
Ltd.
Upper Highland Creek Pan Am Path
Pre and post construction CCTV
Andrews Engineer
$33,274.00
$12,000.00
36%
6/11/2019
$7,000.00
$7,000.00
58%
5/8/2019
12/31/2020
Connection
inspection services.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp (�
Approved %
pp (
Used $
(�
Used %
Start Date
End Date
Project management and EA
Anneliese Grieve
Brampton Flood Protection Project
Strategic Env Plan
$220,590.00
$66,177.00
30%
4/1/2019
$16,875.00
$16,875.00
25%
8/1/2018
3/31/2020
expertise services.
Solutions
Morningside/Rouge River
Engineering services for
assessment and restoration
Aquafor Beech
$44,235.00
$6,635.25
15%
2019
6/12/2019
$1,500.00
$1,500.00
23%
3/8/2018
12/31/2019
Fishway/Dissipator
detailed design.
Engineering services for HEC-
Humber River in York FPM Update
RAS hydraulic model and 66
AQUAFOR BEECH
$95,850.00
$19,200.00
20%
3/22/2019
$16,500.00
$16,500.00
86%
10/8/2018
6/30/2019
floodplain map sheets.
LIMITED
6/12/2019
$2,000.00
$2,000.00
17%
8/23/2017
$2,500.00
$2,500.00
21%
2/19/2019
$13,285.00
$0.00
0%
Upper Highland Creek at Ellesmere
Engineering services for
AQUAFOR BEECH
$85,440.00
$12,000.00
14%
5/3/2016
8/31/2020
12/18/2019
$22,000.00
$7,500.00
63%
Pan Trail Connection
detailed design.
LIMITED
8/9/2018
$19,040.00
$0.00
0%
1/6/2017
$21,400.00
$0.00
0%
8/22/2017
$1,100.00
$0.00
0%
Claireville Conservation Area
Professional engineering
Candevcon
$80,500.00
$8,050.00
10%
9/16/2019
$15,830.00
$8,050.00
100%
8/22/2018
8/28/2020
services for design.
19 - 31 Ridge Point Crescent Erosion
Geotechnical engineering
Central Earth
9/5/2019
$1700
,.
425
,.
$601300
100%
Control and Slope Stabilization
$56,280.00
$6,013.00
il%
6/13/2018
12/30/2022o
Project
services for detailed design.
Engineering
9/10/2018
($5,910.00)
$0.00
0%
2 to Cherry Hills Road Erosion
Geotechnical engineering
Central Earth
services for design
$34,940.00
$5,241.00
15%
5/15/2019
$2,250.00
$2,250.00
43%
7/25/2018
5/31/2019
Control Project
development.
Engineering
Appletree Court and Seeley Drive
Geotechnical engineering
Erosion Control and Slope
services for slope stability and
Central Earth
$18,440.00
$5,000.00
27%
7/26/2019
$1,280.00
$1,280.00
26%
6/26/2019
12/31/2020
Stabilization Project
erosion risk assessment.
Engineering
Geotechnical engineering
Lakeland Drive Major Maintenance
services for slope stability
Central Earth
$102,670.00
$ 15,400.50
15%
10/4/2019
$0.00
0%
7/26/2019
12/31/2020
Project
assessment and conceptual
Engineering($10,000.00)
design alternatives.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp ()
Approved %
pp ( )
Used $
()
Used %)
(
Start Date
End Date
Professional engineering
37-39 Topcliff Avenue Slope
services for a geotechnical
Central Earth
$17,990.00
$1,799.00
10%
10/3/2019
$6,750.00
$1,799.00
100%
8/22/2019
12/31/2021
Stabilization Project
investigation to update detailed
Engineering, Ltd.
design package.
10/29/2018
$9,105.00
$9,105.00
10%
Professional EA management,
7/3/2019
$9,350.00
$9,350.00
11%
Eastern &Broadview Flood
planning, and engineering
DILLON CONSULTING
$290,002.00
$87,000.60
30%
9/27/2017
6/30/2020
11/9/2017
$10,125.00
$10,125.00
12%
Protection Project Class EA
LTD
4/9/2019
$11,475.00
$11,475.00
13%
services.
7/22/2019
$13,316.00
$13,316.00
15%
Beaucourt Road (12-30) Major
Engineering services for
Ecosystem Recovery
4/16/2019
$2,710.00
$2,710.00
46%
$29,320.00
$5,864.00
20%
6/13/2017
12/31/2020
Maintenance Project
detailed design.
Inc.
12/19/2019
$7,960.00
$3,154.00
54%
Appletree Court and Seeley Drive
Geomorphic engineering
Ecosystem Recovery
2/19/2019
$7,900.00
$7,900.00
99%
Erosion Control and Slope
$79,742.00
$7,974.20
10%
12/4/2018
12/31/2020
Stabilization Project — Phase 2
services for detailed design.
Inc.
11/13/2019
$2,170.00
$74.00
1%
Gaffney Park Slope Stabilization
Professional engineering
11/12/2018
$4,000.00
$4,000.00
48%
exp Services Inc.
$83,650.00
$8,365.00
10%
6/13/2017
5/31/2019
Project
services for detailed design.
3/6/2019
$18,750.00
$0.00
0%
Coatsworth Cut Channel Dredging
Channel dredging works for
12/7/2018
$15,000.00
$15,000.00
37%
GALCON MARINE LTD
$203,500.00
$40,700.00
20%
10/2/2018
3/31/2019
Project
safe navigation.
1/14/2019
$10,903.00
$10,903.00
27%
TRCA New Administrative Office
Vertical test bore for ground-
GEOSOURCE ENERGY
$31,000.00
$3,100.00
10%
2/5/2019
$1,500.00
$0.00
0%
1/7/2019
12/31/2019
Building
loop heat exchange.
Installation of a vertical
Surface Cover Pilot Project
borehole for a geothermal
Geosource Energy Inc
$19,300.00
$1,930.00
10%
11/5/2019
$2,250.00
$1,930.00
100%
9/10/2018
4/30/2019
loop.
Peel Village Golf Course -Sanitary
Engineering services for
hydraulic analysis and detailed
GHD
$56,824.00
$5,682.40
10%
2/4/2019
$950.00
$950.00
17%
5/9/2018
8/31/2019
Infrastructure Protection
design.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp ()
Approved %
pp ( )
Used $
()
Used %)
(
Start Date
End Date
Professional engineering
73-95 Clarinda Drive Slope
services for hydraulic analysis,
Stabilization and Erosion Control
stormwater management
GHD Limited
$54,200.00
$5,420.00
10%
6/13/2019
$250.00
$250.00
5%
4/29/2019
12/30/2020
Project
analyses, tree inventory, and
geomorphic assessment.
Palace Pier Court Headland
Coastal engineering services for
GHD Limited
$39,319.50
$3,931.95
10%
12/2/2019
$3,200.00
$3,200.00
81%
6/17/2019
12/31/2020
Maintenance Project
detailed design.
TRCA 2019 Fall Planting
Assorted wildflowers.
GROW WILD!
$7,829.00
$1,174.35
15%
9/25/2019
$1,202.00
$1,174.00
100%
9/16/2019
10/31/2019
Projects/Programs
Exhibit concept and final
2/7/2019
$1,409.00
$0.00
0%
Flynn House Exhibit
graphic design and exhibit
GXCentrik Design Inc.
$10,500.00
$1,050.00
10%
10/24/2018
2/28/2019
installation.
12/18/2018
$15,655.00
$1,050.00
100%
Rental, installation and
12/11/2019
($3,569.00)
$0.00
0%
Patterson Richvale and Valley
demobilization of bypass
Herc Rentals
$40,125.00
$6,018.75
15%
6/24/2019
9/30/2021
pumping systems.
12/11/2019
$18,707.00
$6,019.00
100%
5/31/2018
$6,950.00
$6,950.00
17%
6/21/2018
$7,327.00
$7,327.00
18%
Kennedy Valley Trail, South
3/14/2018
$7,332.00
$7,332.00
18%
Etobicoke Sherway Garden Trail &
Design build services.
Hobden Construction
$404,650.00
$40,465.00
10%
5/2/2017
6/30/2019
11/1/2017
$17,954.00
$17,954.00
44%
Valleywood Phase 2 Trail Bridge
Company Ltd.
5/17/2019
$24,275.00
$0.00
0%
Project
6/5/2018
$77,187.00
$0.00
0%
9/29/2017
$229,838.00
$0.00
0%
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved ($)
Approved (%)
Used ($)
Used (%)
Start Date
End Date
12/12/2019
$690.00
$690.00
23°%
Master CCN Contract for City of
Pre -construction and post-
INFRASTRUCTURE
9/9/2019
$6,262.00
$0.00
0%
Toronto Erosion Control and Slope
construction closed circuit
INTELLIGENCE
$30,370.00
$3,037.00
10%
7/29/2019
1/3/2022
Stabilization Projects - 2019/2020
television (CCN) inspections.
SERVICES INC.
10/11/2019
$6,450.00
$0.00
0%
12/12/2019
$7,403.00
$0.00
0%
Ajax and Pickering Dykes
Engineering services to
KGS Group Consulting
undertake a Conservation
$155,107.00
$38,776.75
25%
7/30/2019
$13,989.00
$13,989.00
36%
6/12/2019
9/25/2019
Rehabilitation Class EA
Ontario Class EA.
Engineers
Don River floodplain mapping
G. Ross Lord Dam
update and G. Ross Lord Dam
KGS Group Consulting
$169,775.00
$33,955.00
20%
4/25/2019
$4,857.00
$4,857.00
14%
2/28/2019
4/1/2020
gate operational review.
Engineers
Engineering services for
7/25/2019
$5,000.00
$5,000.00
13%
Highland Creek Watershed
PCSWMM hydrology, HEC -RAS
MATRIX SOLUTIONS
hydraulic model, and 27
$199,514.00
$39,902.80
20%
10/15/2018
1/31/2020
Hydrology Update
standard floodplain map
INC.
12/17/2019
$10,500.00
$10,500.00
26%
sheets.
Downtown Brampton Flood
Water resource engineering
Matrix Solutions Inc.
$173,670.00
$52,101.00
30%
2/12/2019
$14,845.00
$14,845.00
28%
8/1/2018
3/31/2020
Protection EA
services.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Approved ($)
Contingency
Approved (%)
Revision Date
Revision Cost
Contingency
Used ($)
Contingency
Used (%)
Agreement
Start Date
Agreement
End Date
East Don Trail Construction - Phase 1
Construction goods and
services for 3.1km of asphalt
trail, 1 boardwalk and 4
bridges.
Metric Contracting
Services Corporation
$9,949,934.01
$1,492,490.10
15%
7/9/2019
$750.00
$750.00
0%
8/20/2018
12/31/2020
7/17/2019
($161,170.52)
$0.00
0%
11/15/2018
($70,941.32)
$0.00
0%
1/30/2019
$5,505.00
$5,505.00
0%
9/13/2019
$5,565.00
$5,565.00
0%
11/16/2018
$2,936.00
$2,936.00
0%
2/6/2019
$2,999.00
$2,999.00
0%
12/7/2018
$406,556.00
$406,556.00
27%
12/12/2019
$671,664.00
$0.00
0%
10/29/2019
$137,537.00
$137,537.00
9%
7/29/2019
$78,154.00
$78,154.00
5%
11/8/2019
$94,325.00
$94,325.00
6%
2/1/2019
$21,921.00
$21,921.00
1%
10/29/2019
$48,923.00
$48,923.00
3%
5/28/2019
$53,173.00
$53,173.00
4%
2/5/2019
$63,237.00
$63,237.00
4%
7/30/2019
$40,661.00
$40,661.00
3%
3/13/2019
$43,277.00
$43,277.00
3%
10/10/2019
$13,702.00
$13,702.00
1%
4/4/2019
$14,457.00
$14,457.00
1%
6/21/2019
$8,361.00
$8,361.00
1%
2/14/2019
$6,728.00
$6,728.00
0%
5/13/2019
$3,303.00
1 $3,303.00
0%
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Approved ($)
Contingency
Approved (%)
Revision Date
Revision Cost
Contingency
Used ($)
Contingency
Used (%)
Agreement
Start Date
Agreement
End Date
East Don Trail Construction -Phase 2
Construction goods and
services for 3.1km of asphalt
trail, 1 boardwalk and 4
bridges.
Metric Contracting
Services Corporation
$9797,493.62
$1,469,624.04
15%
8/16/2018
($3,839,880.34)
$0.00
0%
7/5/2018
7/1/2020
10/18/2019
($52,170.00)
$0.00
0%
7/17/2019
($39,997.00)
$0.00
0°%
5/13/2019
$1,599.00
$1,599.00
0%
9/13/2019
$2,558.00
$2,558.00
0%
6/10/2019
$5,105.00
$5,105.00
0%
2/5/2019
$5,116.00
$5,116.00
0%
3/13/2019
$5,116.00
$5,116.00
0%
10/16/2019
$3,037.00
$3,037.00
0%
10/10/2019
$3,154.00
$3,154.00
0%
11/15/2018
$5,955.00
$5,955.00
0%
4/4/2019
$6,276.00
$6,276.00
0%
2/14/2019
1/30/2019
$8,313.00
$8,316.00
$8,313.00
$5,316.00
1%
1%
10/28/2019
$9,528.00
$9,528.00
1%
9/19/2019
$22,250.00
$22,250.00
2%
10/31/2019
$24,290.00
$24,290.00
2%
10/25/2019
$34,132.00
$34,132.00
2%
11/25/2019
$37,303.00
$37,303.00
3%
10/25/2019
$44,520.00
$44,520.00
3%
12/9/2019
$44,869.00
$44,869.00
3%
3/29/2019
$15,791.00
$15,791.00
1%
4/24/2019
$21,418.00
$21,418.00
1%
10/25/2019
$71,840.00
$71,840.00
5%
12/5/2019
$130,724.00
$130,724.00
9%
12/7/2018
$281,440.00
$281,440.00
19%
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp ( )
Approved /
pp (°°)
Used $
( )
Used %
( )
Start Date
End Date
Fluvial geomorphic engineering
8/2/2019
$13,956.00
$0.00
0%
Rainbow Creek Sanitary Trunk Sewer
services for assessment and
Palmer Environmental
$16,382.00
$1,638.20
10%
5/21/2019
12/31/2019
conceptual design.
Consulting Group Inc.
6/26/2019
$2,800.00
$1,638.00
100%
Professional fluvial geomorphic
West Don River in E.T. Seton Park
consulting services for
Palmer Environmental
geomorphic assessment,
$16,946.00
$2,541.90
15%
10/2/2019
$14,900.00
$2,542.00
100%
3/22/2019
12/22/2021
Major Maintenance Project
meander belt width delineation
Consulting Group Inc.
and erosion risk assessment.
Engineering services for
Heart Lake Conservation Area
detailed design of the new
R.J. BURNSIDE &
$78,335.00
$7,833.50
10%
4/15/2019
$12,000.00
$7,834.00
100%
7/19/2017
3/31/2018
Heart Lake water system.
ASSOCIATES LIMITED
30 Northline Road Erosion Control
Geotechnical and water
7/5/2019
$17,908.00
$17,908.00
72%
and Slope Stabilization Project
resources engineering services
TERRAPROBE INC.
$44,749.00
$24,810.00
55%
1/12/2016
12/31/2021
for detailed design.
7/8/2019
$33,772.00
$6,902.00
28%
Geotechnical engineering
37-77 Rossmull Crescent
services for slope stability and
TERRAPROBEINC.
$33,164.00
$3,316.40
10%
1/8/2019
$375.00
$375.00
11%
10/8/2018
12/31/2019
erosion risk assessment.
Geotechnical engineering
Denison Road Long Term Stable
services for slope stability
TERRAPROBE INC.
$66,085.00
$13,217.00
20%
12/2/2019
$140.00
$140.00
1%
6/6/2019
6/6/2020
Slope Crest (LTSSC) Update
assessment and conceptual
design alternatives.
Geotechnical engineering
2/20/2018
$950.00
$950.00
6%
Don Valley Drive and Hillside Drive
services for slope stability
TERRAPROBE INC.
$162,020.00
$16,202.00
10%
9/20/2017
4/17/2020
analysis and erosion risk
6/7/2018
$1,650.00
$1,650.00
10%
assessment.
Moore Park Ravine along 191- 195
Hudson Drive- Slope Stabilization
Detailed design services.
TERRAPROBE INC.
$57,400.00
$8,610.00
15%
4/16/2019
($10,874.00)
$0.00
0%
11/17/2017
12/31/2020
Project
Yellow Creek behind Heath Street
Geotechnical and structural
engineering services for
Terraprobe Inc.
$21,115.00
$3,167.25
15%
5/6/2019
$2,600.00
$0.00
0%
4/19/2018
12/31/2022
East
concept designs.
Attachment 2 - Contract Revisions
Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved ($)
Approved (%)
Used ($)
Used (%)
start Date
End Date
2019 Bike The Creek
BBQ lunch catering for
The Gourmet Grou P
$8,600.00
$2,150.00
25%
10/9/2019
$2,130.00
$2,130.00
99%
6/22/2019
6/22/2019
community participants.
100 grow trays and 10 grow
The Meadoway
lights for classes to grow native
Veseys
$3,000.00
$600.00
20%
11/20/2019
$4,420.00
$600.00
100%
3/13/2019
6/28/2019
plants.
Ashbridges Bay Park Major
Coastal engineering services for
W F. Baird & Associates
$89,242.00
$8,924.20
10%
12/12/2019
$32,900.00
$8,942.00
100%
8/28/2018
12/31/2020
Maintenance
detailed design.
Toronto Islands Flood
Engineering services for flood
W.F. Baird and
Characterization and Risk
characterization and risk
Associates Coastal
$174,092.00
$17,409.20
10%
8/28/2019
$3,390.00
$3,390.00
19%
8/15/2018
8/31/2019
Assessment Project 2018
assessment.
Engineers Ltd.
Sunnyside Park Revetment
Coastal engineering services for
WF Baird and
$57,998.00
$5,799.80
10%
12/18/2019
$8,000.00
$5,800.00
100%
9/3/2019
12/31/2020
Maintenance Project
detailed designs.
Associates
Engineering services for HEC-
Wood Environment &
12/20/2019
$1,998.00
$1,998.00
23%
2019 Rouge River Floodplain
RAS hydraulic model and
Infrastructure
$87,435.86
$8,743.59
10%
1/25/2019
12/31/2019
Mapping Update -Phase I
floodplain mapping update.
Solutions
10/23/2019
$3,040.00
$3,040.00
35%
10/4/2019
$1,982.00
$1,982.00
4%
Black Creek at Rockcliffe SPA Flood
Professional engineering
Wood Environmental &
Remediation and Transportation
Infrastructure
$498,126.00
$49,812.60
10%
9/27/2019
$5,589.00
$5,589.00
11%
6/17/2019
12/31/2020
Feasibility Study
services.
Solutions
9/10/2019
$21,320.00
$21,320.00
43%
RWMP/Mayfield/RNUP/Seaton/Bath
York Durham Regional
2019 Water quality lab analysis.
Environmental
$33,290.40
$3,329.04
10%
12/16/2019
$7,329.00
$3,329.00
100%
1/1/2019
12/31/2019
urst Glen/Albion Hills
Laboratory
5/22/2019
$103,475.00
$103,475.00
29%
TRCA New Administrative Office
Architectural, landscape, and
ZAS Architects Inc. and
9/30/2019
$5,290.00
$0.00
0%
engineering final design
Bulcholz McEvoy
$3,533,860.00
$353,386.00
10%
9/22/2017
12/31/2021
9/17/2019
$10,590.00
$0.00
0%
Building
services.
Architects Ltd.
4/8/2019
$78,060.00
$0.00
0%
10
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Sediment solidification of storm
9/23/2019
$11,016.00
$1,652.00
100%
York University SWMP Maintenance
Di -Corp
$16,524.00
$1,652.40
10%
9/2/2019
12/31/2019
pond sediments.
10/31/2019
$24,786.00
$0.00
0%
General contractor for the
Albion Hills Field Centre
demolition and new
Adems Restoration
$149,000.00
$29,800.00
20%
12/12/2019
$1,200.00
$1,200.00
4%
11/11/2019
1/20/2020
construction of the Albion Hills
Field Centre loading dock.
9/20/2019
$6,500.00
$6,500.00
24%
Bolton Camp Phase 1
High voltage electrical services.
Alineutility Limited
$181,720.00
$27,258.00
15%
9/28/2018
3/29/2019
9/19/2019
$10,566.00
$10,566.00
39%
Redevelopment Project
9/23/2019
$17,500.00
$10,192.00
37%
1/9/2019
$6,620.00
$6,620.00
90%
Lakeview Waterfront Connection
Sandblasting, inspecting for
micro -cracks, and galvanizing
Allsteel Fabrication Inc
$73,959.20
$7,395.92
10%
4/10/2019
$4,950.00
$0.00
0%
1/7/2019
5/1/2019
Project
two temporary steel bridges.
2/22/2019
$11,128.00
$776.00
10%
Jennifer- Whitburn Multi -use Trail
Labour, equipment, and
AMAC Paving Ltd.
$181,157.50
$18,115.75
10%
12/9/2019
($12,968.00)
$0.00
0%
10/1/2019
12/30/2022
Connection
material for asphalt paving.
10/1/2018
$18,300.00
$3,652.00
100%
Rental of a three unit
Restoration Services Centre
washroom trailer to
AMPOT PORTABLE
$18,260.00
$3,652.00
20%
11/2/2017
11/1/2020
accommodate additional staff.
TOILETS INC.
10/29/2019
$18,300.00
$0.00
0%
Etobicoke Valley Park (EC04 and
Pre and post -construction CCTV
6/14/2019
$1,500.00
$0.00
0%
andrews.engineer
$36,476.00
$5,471.40
15%
11/14/2018
12/31/2019
EC03.4) Major Maintenance
inspections.
1/28/2019
$8,000.00
$5,471.00
100%
Pre -and post -construction
AQUA TECH
12/4/2019
($4,560.00)
$0.00
0%
Mud Creek Reach 6
$5,600.00
$840.00
15%
10/22/2019
12/31/2020
CCTV inspection services.
SOLUTIONS INC.
11/12/2019
$7,060.00
$840.00
100%
11
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Ontario Land Surveyor (OLS)
services to complete a legal
19 - 31 Ridge Point Crescent
survey, property boundary
AVANTI SURVEYING
$10,500.00
$750.00
7%
5/30/2019
$2,000.00
$0.00
0%
9/19/2018
5/31/2020
stakeout, installation of
INC.
property monuments, and a
Reference Plan (R -Plan).
Ontario Land Surveyor (OLS) for
Surveyor's Real Property Report
Mimico Creek Behind Ridgegate
(SRPR), property boundary
AVANTI SURVEYING
$14,000.00
$1,400.00
10/
9/16/2019
$2,000.00
$0.00
0%
7/16/2019
12/31/2021
Crescent
stakeout prior to construction,
INC.
and installation of new
property monuments.
10/24/2019
$227.00
$227.00
0%
10/25/2019
$873.00
$873.00
1%
Labour, equipment and
10/28/2019
$5,000.00
$5,000.00
6%
Heart Lake Conservation Area
material for the potable water
UTILITY
$429,124.00
$85,824.80
20%
2/5/2018
12/31/2020
line replacement.
TIONS INC.
SOLUO
SOLUT
4/19/2018
$7,410.00
$7,410.00
9%
1/29/2019
$19,494.00
$19,494.00
23%
Electrical upgrades at both the
Restoration and Infrastructure
Restoration Services Centre and
BOLTON ELECTRIC
Boyd Centre for construction
$12,700.00
$3,175.00
25%
11/14/2019
$12,732.00
$3,175.00
100%
4/1/2019
12/20/2019
Campus
operations and electric vehicle
COMPANY INC
charging stations.
8/20/2019
($105,812.00)
$0.00
0%
Parking lot paving goods and
9/16/2019
$4,100.00
$0.00
0%
West Don Trail
Bond Paving
$337,769.00
$33,776.90
10%
9/4/2018
5/31/2019
services.
9/10/2019
$12,845.00
$0.00
0%
9/6/2019
$22,251.00
$0.00
0%
Bolton Camp
Rental of security cameras.
Caliber
$18,515.00
$1,851.50
10%
2/8/2019
$31,740.00
$0.00
0%
6/18/2018
12/31/2019
Communications
12
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Rotary Park Shoreline Maintenance
Supply and delivery of 4-6
CDR Young Aggregates
$124,360.00
$12,436.00
10%
4/5/2019
$21,763.00
$12,436.00
100%
7/10/2018
12/31/2019
tonne piece armoustrone.
TRCA Planting Program/Projects
Wooden stakes.
CENTRAL FAIRBANK
$6,040.00
$1,208.00
20%
4/24/2019
$3,240.00
$1,208.00
100%
4/4/2019
12/31/2019
Spring 2019
LUMBER
Various Parks and Culture Events
Supply and delivery of portable
toilets for various events at
Chantlers
$16,200.00
$1,620.00
10%
2/22/2019
$17,820.00
$0.00
0%
4/30/2018
4/30/2020
2018
Parks facilities.
Firewood and kindling to
Black Creek Pioneer Village
support programming and
City Loggers
$3,700.00
$370.00
10%
1/31/2019
$3,700.00
$370.00
100%
5/23/2018
5/23/2019
operations.
RSC and Boyd Centre
Fire inspection Services.
Control Fire Systems
$1,538.80
$76.94
5%
11/6/2019
$7,588.00
$77.00
100%
8/6/2018
8/2/2019
Don Mills Access, South of Overlea
Supply, delivery and installation
CSL GROUP LTD.
$257,180.00
$25,718.00
10%
11/27/2019
($4,227.00)
$0.00
0%
10/17/2019
3/31/2020
Trail Project
of concrete park infrastructure.
Construction goods and
10/15/2019
$10,522.00
$10,522.00
5%
Franklin Pond Project
services for boardwalk
CSL GROUP LTD.
$1,318,555.00
$197,783.25
15%
12/10/2018
12/31/2019
structures and landscaping
works.
9/11/2019
$23,733.00
$23,733.00
12%
9/9/2019
$1,031.00
$1,031.00
1%
5/13/2019
$2,700.00
$2,700.00
2%
6/25/2019
$7,761.00
$7,761.00
6%
Gaffney Park Slope Stabilization
Supply and installation of slope
stabilization and drainage
CSL Group Ltd.
$698,400.00
$139,680.00
20%
1/11/2019
$13,304.00
$13,304.00
10%
10/1/2018
8/31/2019
Project
system .
12/5/2018
$21,250.00
$21,250.00
15%
2/27/2019
$24,076.00
$24,076.00
17%
5/2/2019
$38,868.00
$38,868.00
28%
Fall 2019 Planting Program
Deer fencing.
Deer Fence Canada Inc.
$13,568.00
$1,356.80
10%
9/20/2019
$1,008.00
$1,008.00
74%
9/16/2019
12/31/2019
13
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
21 and 24 Disan Court Erosion
Labour, material, and
Diamond Earthworks
6/3/2019
$850.00
$0.00
0%
Control and Slope Stabilization
$3,740.00
$374.00
10%
10/25/2018
12/31/2019
Project
equipment to pave driveway.
Corp.
5/29/2019
$3,200.00
$374.00
100%
Labour, equipment and
Pomona P-080 Sanitary Protection
materials for asphalt paving of
DIAMOND
$15,081.75
$1,508.18
10%
5/21/2019
$1,925.00
$1,508.00
100%
4/15/2019
10/8/2019
255 m2 of trail.
EARTHWORKS CORP.
Engineering services to
Milne Dam
investigate deficiencies at Milne
DM Wills Associates
$84,375.00
$16,875.00
20%
1/7/2019
$6,900.00
$6,900.00
41°%
6/14/2018
3/31/2019
Dam.
Tommy Thompson Park
Supply and installation 6 swing
Dufferin Iron & Railings
$10,800.00
$2,160.00
20%
8/13/2019
$3,850.00
$2,160.00
100%
6/10/2019
10/31/2019
gates for traffic calming.
Construction of sewage pump
10/10/2019
($12,120.00)
$0.00
0%
Bolton Camp
station, sanitary sewer and
Earth Boring Co. Ltd.
$3,847,082.00
$769,416.40
20%
6/5/2019
1/31/2020
watermain.
10/23/2019
$2,148.00
$2,148.00
0%
Eavestrough replacement
3/28/2019
($600.00)
$0.00
0%
Riverhead Drive Minor Works
Eaves Experts
$3,570.00
$357.00
10%
12/13/2018
12/12/2021
services.
4/19/2019
$0.00
$0.00
0%
West Don River near Langstaff (P-
Engineering services for
Ecosystem Recovery
6/17/2019
$14,540.00
$0.00
0%
128)
geomorphic assessment and
Inc
$35,485.00
$3,548.50
10%
10/20/2017
7/31/2020
conceptual designs.
2/13/2018
$5,800.00
$3,549.00
100%
1/18/2019
($10,938.00)
$0.00
0%
6/6/2018
$650.00
$650.00
11%
Supply and installation of
Various TRCA Construction Projects
various type of fencing at four
Fencing and
$57,016.76
$5,701.68
10%
5/14/2018
$2,048.00
$2,048.00
36%
5/7/2018
12/31/2019
(4) construction projects.
General Construction
Ge
4/22/2019
$1,579.00
$0.00
0%
9/19/2018
$8,406.00
$3,004.00
53%
14
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Supply and delivery of firewood
and kindling for resale at Indian
Parks & Culture Resale Items 2019
Line Campground; Albion Hills
Firewood Guys
$78,550.00
$7,855.00
10%
12/12/2019
$12,255.00
$7,855.00
100%
4/15/2019
10/31/2020
Campground; and Glen Rouge
Campground.
Construction goods and
12/12/2019
($1,000.00)
$0.00
0%
Boyd Centre Cafeteria Interior
services for interior renovation
Fresco Enterprises Inc.
$278,530.38
$41,779.56
15%
12/2/2019
4/24/2020
Renovations
of Boyd Centre Cafeteria.
12/11/2019
$1,298.00
$1,298.00
3%
R&I Tick Removal Kits
Tick removal Kits.
G. Magnotta
$995.00
$149.25
15%
5/28/2019
$995.00
$149.00
100%
4/22/2019
4/26/2019
Foundation
Gibraltar Point Erosion Control
Construction goods and
9/11/2019
$8,020.00
$8,020.00
1%
services fora near shore reef
GALCON MARINE LTD
$9,077,161.00
$907,716.10
10%
9/10/2018
12/28/2020
Project
and groyne.
10/19/2018
$14,895.00
$14,895.00
2%
Lakeview Waterfront Connection
Fabrication, supply and delivery
GANAWA COMPANY
$62,300.00
$6,230.00
10%
3/28/2019
$25,380.00
$6,230.00
100%
11/5/2018
2/28/2019
Project
of a temporary bridge.
LTD.
Jennifer Court- Whitburn Crescent
Subgrade and granular
Geomaple Geotechnics
$3,140.00
$314.00
10%
10/11/2019
($720.00)
$0.00
0%
8/12/2019
12/31/2021
Multi -use Trail
compaction testing service.
Inc.
Jennifer-Whitburn Trail Connection
Geotechnical and structuralGeomaple
Geotechnics
engineering services for draft
$7,350.00
$735.00
10%
5/1/2019
$2,500.00
$0.00
0%
8/2/2018
12/31/2020
Project
design drawings.
Inc.
TRCA Central Filing
Numbered labels for records
Gibson Printing
$1,196.00
$119.60
10%
10/5/2019
$1,220.00
$120.00
100%
7/23/2018
5/31/2019
files.
RotaryPark Shoreline Maintenance
Supply of dump tickets for
GM Excavating
$3,250.00
$650.00
20%
3/5/2019
$3,250.00
$650.00
100%
2/12/2019
4/30/2019
10/8/2019
($8,050.00)
$0.00
0%
Off-site removal of stockpiled
Green space
Wilket Creek Rehabilitation Reach 2
Landscaping &
$124,750.00
$12,475.00
10%
10/1/2019
($5,425.00)
$0.00
0%
5/13/2019
10/31/2019
soil.
property Services Inc.
10/24/2019
$15,328.00
$12,475.00
100%
15
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Restoration and Infrastructure
Green Leaf Pest Control
9/9/2019
$1,605.00
$1,605.00
47%
Pest control services.
$13,678.49
$3,419.62
25%
1/31/2019
2/28/2022
Campus
Inc
12/3/2019
$16,590.00
$0.00
0%
York University SWMP Maintenance
Hauling and disposal of storm
Groundforce
$73,881.25
$7,388.13
10%
10/30/2019
$20,749.00
$7,388.00
100%
9/2/2019
12/31/2019
pond sediments.
Environmental
4/10/2019
$8,873.00
$8,873.00
97%
Labour, equipment and
Denison Road Major Maintenance
material for asphalt paving and
Hilton Construction
$45,872.36
$9,174.47
20%
5/17/2019
$4,950.00
$301.00
3%
11/15/2018
6/30/2019
terraseeding works.
5/30/2019
$6,442.00
$0.00
0%
Jennifer - Whitburn Multiuse Trail
Pre construction CCN
Infrastructure
Intelligence Services
$19,900.00
$1,990.00
10%
6/19/2019
($4,125.00)
$0.00
0%
5/3/2019
9/3/2020
Connection Project
inspections.
Inc.
Ontario Land Surveyor (OLS)
services to complete a Legal
Ivan B. Wallace O.L.S.
9 Alderbrook Drive
Boundary Survey, Surveyor's
$5,300.00
$795.00
15%
6/26/2019
$1,975.00
$795.00
100%
11/9/2018
7/31/2020
Ltd
Real Property Report and
Draft/Final Reference Plan.
TO Islands 2019 Flooding
Aquadams.
Layfield Canada Ltd.
$26,480.00
$2,648.00
10%
6/12/2019
$18,960.00
$2,648.00
100%
5/21/2019
12/20/2019
Parks and Culture Facilities
Fire inspection Services.
Life Line Fire Protection
$8,890.00
$889.00
10%
4/11/2019
$8,890.00
$0.00
0%
1/5/2018
1/5/2021
9/20/2018
$3,085.00
$3,085.00
5%
Construction goods and
Mud Creek Reach 2 Culvert
services for a boardwalk, water
MCPHERSON-
11/2/2018
$6,780.00
$6,780.00
11%
ANDREWS
$602,647.00
$60,264.70
10%
8/16/2018
4/30/2020
Replacement Project
feature, and culvert
CONTRACTING LTD.
4/30/2019
$49,523.00
$49,523.00
82%
replacement.
11/20/2019
$257,149.00
$0.00
0%
TRCA Nursery Program
Bulkwillow canes made up of
Neil Vanderkruk
$8,000.00
$1,600.00
20/ °
3/4/2019
$4,000.00
$1,600.00
100%
1/7/2019
5/31/2019
different species.
Holdings Inc.
16
Attachment 2 - Contract Revisions
Lowest Bid
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
1025 Scarlett Road Phase 2
Rental, delivery and assembly
Northern Mat & Bridge
$17,356.20
$3,471.24
20%
8/6/2019
$2,394.00
$2,394.00
69%
5/27/2019
8/30/2019
of timber access mud mats.
Ltd. Partnership
Peel Village Golf Course - Sanitary
Rental of access mats.
Northern Mat & Bridge
$38,771.56
$3,877.16
10%
2/28/2019
$2,473.00
$2,473.00
64%
1/23/2019
4/30/2019
Infrastructure Protection
Ltd. Partnership
Labour, equipment and
Black Creek Trail at Shoreham Dr
material for asphalt paving
PACIFIC PAVING
$25,460.50
$5,092.10
20%
11/7/2019
$77,273.00
$0.00
0%
11/1/2018
12/31/2020
works.
Ticket kiosk retrofit and
Heart Lake Conservation Area
security upgrades at the Heart
PCI CONTRACTING
$18,680.00
$1,500.00
8%
5/8/2019
$4,000.00
$1,500.00
100%
1/17/2019
5/31/2019
Lake Aquatic Facility.
MECHANICAL
4/2/2019
$766.00
$766.00
36%
Electrical contracting services
101 Exchange Ave. Building
to modify existing generator
Plan Group Inc.
$10,500.00
$2,100.00
20%
4/8/2019
$1,720.00
$1,335.00
64%
3/25/2019
7/12/2019
loads.
5/9/2019
$33,000.00
$0.00
0%
Various Restoration Project Sites
Supply and delivery of cover
QUALITY SEEDS LTD.
$9,207.00
$920.70
10%
10/8/2019
$5,011.00
$921.00
100%
4/24/2019
12/30/2019
crop mixes.
2/4/2019
$1,981.00
$1,981.00
6%
Hazardous substance
2/1/2019
$9,704.00
$9,704.00
28%
5 Shoreham Drive Project
abatement, demolition waste
Salandria Ltd.
$227,003.00
$34,050.45
15%
12/26/2018
3/29/2019
management and site grading
services.
2/6/2019
$57,883.00
$0.00
0%
Compaction testing services for
23 Brixham Terrace
slope stabilization and asphalt
TERRAPROBE INC.
$6,125.00
$612.50
10%
5/15/2019
$950.00
$612.00
100%
4/30/2019
7/1/2019
repaving works.
Brock Road North
Truck rental.
THOMAS SOLUTIONS
$11,872.00
$2,374.40
20%
2/19/2019
$11,265.00
$2,374.00
100%
3/14/2018
12/31/2019
The mobilization, set-up and
Jenniferi Multiuse Trail
operation of soil screening
EMI Contracting and
$7,400.00
$740.00
10%
11/6/2019
$1,280.00
$740.00
100%
9/23/2019
12/31/2020
n Projecttburn
Connection Project
Equipment Rental Ltd.
equipment.
17
Attachment 2 - Contract Revisions
Lowest Bid
TRCA Residential Rental Properties
Eaves trough replacement
Tony K. Roofing
$12,500.00
$1,250.00
10%
12/12/2019
$21,000.00
$0.00
0%
10/21/2019
11/20/2019
services.
Approved $
Approved %
Used $
Used %
Start Date
End Date
Form and pouring of new
1025 Scarlett Rd
concrete sidewalk and bench
VoX Construction Inc.
$4,300.00
$430.00
10%
7/17/2019
$2,790.00
$430.00
100%
7/15/2019
7/25/2019
pad.
LIMITED
Etobicoke Valley Park
Asphalt paving services.
VoX Construction Inc.
$5,600.00
$560.00
10%
11/5/2019
$500.00
$500.00
89%
10/18/2019
12/31/2019
Patterson Richvale Sanitary
Demolition servicesfor removal
8/26/2019
$4,650.00
$2,650.00
100%
TRCA New Administrative Office
of portable buildings at 5
York Demolition Corp.
$44,818.00
$4,481.80
10%
5/31/2019
$360.00
$360.00
8%
6/3/2019
6/30/2019
Building
Shoreham Drive.
LTD.
Limited Tendering
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Consulting services to update
P-524 Yonge Street Flume 2
the detailed design drawings
AQUAFOR BEECH
$6,200.00
$620.00
10%
10/17/2019
$3,600.00
$620.00
100%
6/26/2019
6/26/2021
and associated HECRAS
LIMITED
modelling.
Patterson Richvale Sanitary
Engineering services for
8/26/2019
$4,650.00
$2,650.00
100%
Infrastructure Protection and
construction support and
GRECK & ASSOCIATES
$26,500.00
$2,650.00
10%
6/5/2019
12/31/2020
construction verification
LTD.
Valleylands Erosion Control
reporting.
11/12/2019
$6,825.00
$0.00
0%
Swan Lake Outdoor Education
Annual HVAC maintenance
HTS
$2,500.00
$500.00
20%
9/23/2019
$2,355.00
$0.00
0%
5/1/2019
4/30/2020
Centre
services.
11/18/2019
$1,950.00
$0.00
0%
TRCA New Administrative Office
Legal land survey and
1.D.Barnes Ltd.
$4,900.00
$490.00
10%
7/17/2019
12/31/2019
8/2/2019
$8,600.00
$0.00
0%
Building
topographical services.
12/4/2019
$16,775.00
$0.00
0%
KOOY BROTHERS
Kubota Track Carrier Maintenance
Annual service and repairs.
LAWN EQUIPMENT
$2,000.00
$400.00
20%
4/17/2019
$1,330.00
$400.00
100°%
3/14/2019
4/30/2019
LTD.
Preventative maintenance
Boyd Centre
services for Boyd HVAC
Service Experts
$51000.00$1,000.00
L
20%
4/16/2019
$2,034.00
$0.00
0%
5/1/2019
3/31/2021
systems.
I
Attachment 2 - Contract Revisions
Limited Tendering
IM
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Human resources and payroll
Approved $
Approved %
Used $
Used %
Start Date
End Date
Boyd Centre & Workshop
Boiler repair services.
Service Experts
$4,517.00
$1,000.00
22%
5/21/2019
$3,216.00
$485.00
49%
3/25/2019
6/30/2019
System
Professional engineering
Yellow Creek Below Summerhill
services for peer review of
TERRAPROBE INC.
$18,470.00
$2,600.00
14%
11/25/2019
($13,850.00)
$0.00
0%
10/1/2019
12/31/2020
Gardens Emergency Works
design drawings and
Perkins+ Will
$245,975.00
$0.000%
1/24/2019
12/31/2019
construction support.
3/11/2019
$17,000.00
$0.00
0%
Engineering services for tender
WSP Canada Group12/13/2019
$5,100.00
$0.00
0%
Kortright Centre Glass House
Booking of conference venue -
$5,000.00
$1,000.00
20%
2/27/2019
8/28/2020
2019 Geoscience Workshop
design drawings.
Ltd.
$7,138.70
$713.87
10%
11/18/2019
$26,560.00
$0.00
0%
6/22/2018
2/28/2019
Not Highest Ranked
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
A roved $
Contingency
Approved %
Revision Date
Revision Cost
Contingency
Used $
Contingency
Used %
Agreement
Start Date
Agreement
End Date
Human resources and payroll
Approved $
Approved %
Used $
Used %
Start Date
End Date
Human Resources Information
information system (software
Ceridian HCM Inc.
$1,599,569.00
$239,935.35
15%
7/5/2019
$31,920.00
$31,920.00
13%
5/25/2018
11/30/2019
System
as a service).
Armoured Car Services 2018 - 2019
Professional landscape
BRINK'S CANADA LTD.
$6,257.93
$1,251.59
20%
9/9/2019
$4,690.00
$0.00
0%
10/15/2018
6/30/2020
The Meadoway
architecture and design
Perkins+ Will
$245,975.00
$0.000%
1/24/2019
12/31/2019
services.
3/11/2019
$17,000.00
$0.00
0%
Preferred Source
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
Approved %
Used $
Used %
Start Date
End Date
Armoured cash pick-up and
transportation services for
Armoured Car Services 2018 - 2019
Black Creek Pioneer Village,
BRINK'S CANADA LTD.
$6,257.93
$1,251.59
20%
6/19/2019
$38,956.92
$0.00
0%
10/15/2018
6/30/2020
Kortright Centre for
Conservation and Bathurst Glen
Golf Course.
Booking of conference venue -
2019 Geoscience Workshop
Delta Hotels Guelph by
Delta Hotels Guelph
$7,138.70
$713.87
10%
3/6/2019
$12,334.00
$713.00
100%
6/22/2018
2/28/2019
Conference Centre
Marriott.
Enhancement/development of
Provision of LID Treatment Train
hydrological modeling
Golder and Associates
$85,080.00
$0.00
0%
4/16/2019
$3,500.00
$0.00
0%
8/30/2018
7/31/2019
Tool -Version 2 -Phase 1
software.
19
Attachment 2 - Contract Revisions
Preferred Source
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Humber River between 1025 Scarlett
Removal and reconfiguration of
Approved $
Approved %
6/25/2019
$2,598.00
Used $
Used %
Start Date
End Date
Road and Cruickshank Park Erosion
Professional consulting services
Park N Play Design
$77,053.60
$7,705.36
10%
6/3/2019
12/31/2019
to develop the sustainability
Control and Slope Stabilization
9/10/2019
$5,500.00
$0.00
0%
TRCA New Administrative Office
program and manage the
Green Reason Inc.
$87,500.00
$8,750.00
10%
1/8/2018
8/31/2021
Building
65%
Project Phase 2
sustainability certification
4/5/2019
$9,800.00
$0.00
0%
process.
Carruthers Creek Watershed Plan
Geomorphic engineering
MATRIX SOLUTIONS
$1,530.00
$0.00
0%
9/13/2019
$2,670.00
$0.00
0%
11/5/2018
12/31/2019
services.
INC.
Geotechnical engineering
11/6/2018
$4,871.00
$4,871.00
100%
12 Azalea Court
services for slope stability
TERRAPROBE INC.
$32,515.00
$4,877.25
15%
1/11/2018
1/31/2020
assessment and conceptual
3/22/2019
$12,650.00
$0.00
0%
alternatives.
dditional analysis of 130.5
WSP Canada Group
SWM Humber hydrology update
urs to complete the final
Eport.
$18,830.00
$1,883.00
10%
8/9/2019
$3,630.00
$1,883.00
100%
12/11/2018
4/1/2020
Ltd.
Sole Source
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Approved ($)
Contingency
Approved (%)
Revision Date
Revision Cost
Contingency
Used ($)
Contingency
Used (%)
Agreement
Start Date
Agreement
End Date
Humber River between 1025 Scarlett
Removal and reconfiguration of
6/25/2019
$2,598.00
$2,598.00
34%
Road and Cruickshank Park Erosion
the existing GameTime
Park N Play Design
$77,053.60
$7,705.36
10%
6/3/2019
12/31/2019
Control and Slope Stabilization
Company Ltd.
children's playground.
6/7/2019
$5,014.00
$5,014.00
65%
Project Phase 2
20
Attachment 2 - Contract Revisions
Vendor of Record
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved ($)
Approved (%)
Used ($)
Used (%)
Start Date
End Date
A&G The Road
Cleaners Ltd.; Durham
Various 2018 Construction Projects
Street sweeping and flusher
Power Sweeping;
$90,000.00
$0.00
0%
2/27/2019
$110,000.00
$0.00
0%
1/1/2018
12/31/2019
truck services.
Centennial
Construction &
Equipment Rentals
Dyed Diesel Fuel Supply and Delivery
Supply and delivery of dyed
Alpha Oil Inc.; Canada
$65,000.00
$0.00
0%
diesel and fuel for various 2018
$85,000.00
$0.00
0%
1/1/2018
12/31/2019
2/26/2019
$100,000.00
$0.00
0%
for 2018 Construction Season
construction projects.
Clean Fuels Inc./15/2018
c.
Chantler's
Environmental Services
Ltd.; Remediation
Various 2018 Construction Projects
Rental of site toilets.
Worx Environmental
$80,000.00
$0.00
0%
2/26/2019
$50,000.00
$0.00
0%
1/1/2018
12/31/2019
Services Inc.; K. Winter
Sanitation Inc.; Ampot
Portable Toilets Inc.
Cooper Equipment
Rentals; Sunbelt
Vendor or record arrangement
Rentals Canada; United
Various Construction Projects
for rental of small construction
Rentals; Hertz
$300,000.00
$0.00
0%
5/17/2019
$400,000.00
$0.00
0%
8/1/2018
8/1/2020
2018/2019
equipment.
Equipment Rental; and
Battlefield Equipment
Rentals.
Draglam Waste &
Recycling; Kirby Waste
Transfer Solutions;
Various 2018 Construction Projects
Woody debris disposal services.
Public Disposal and
$90,000.00
$0.00
0%
2/28/2019
$50,000.00
$0.00
0%
1/1/2018
12/31/2019
Recycling Inc.; Superior
Disposal; Miller Waste
Systems Inc.
21
Attachment 2 - Contract Revisions
Vendor of Record
Project Name
Goods/Services Procured
Awarded Bidder
Contract Cost
Contingency
Contingency
Revision Date
Revision Cost
Contingency
Contingency
Agreement
Agreement
Approved $
pp ()
Approved %
pp ( )
Used $)
(
Used %
( )
Start Date
End Date
Rental of office trailers and
Mobile Mini Canada;
Various 2018 Construction Projects
ATCO Structures and
$70,000.00
$0.00
0%
2/26/2019
$40,000.00
$0.00
0%
1/1/2018
12/31/2019
storage containers.
Logistics
Rental of six foot high
Modu-loc Fence
Various 2018 Construction Projects
Rentals; Sunbelt
$95,000.00
$0.00
0%
2/26/2019
$95,000.00
$0.00
0%
1/1/2018
12/31/2019
construction fencing.
Rentals of Canada
9/3/2019
$59,377.00
$0.00
0%
Rogers Communications Inc. VOR
Rogers wireless devices and
Rogers Wireless Inc.
$1,200,000.00
$0.00
0%
2/1/2014
10/17/2022
9/10/2019
$65,744.00
$0.00
0
Ok
Adoption Agreement
services.
10/24/2019
$31,622.00
$0.00
0%
Superior Disposal; Cos
Various 2018 Construction Projects
Rental of steel road plates.
Shore Inc.; Sunbelt
$65,000.00
$0.00
0%
2/26/2019
$40,000.00
$0.00
0%
1/1/2018
12/31/2019
Rentals of Canada
10/31/2018
$760.00
$0.00
0%
Vendor of record arrangement
Terrafix Geosynthetics
Various Erosion Projects
for supply and delivery of
Inc.; Hanes
$350,000.00
$0.00
0%
10/23/2017
$2,600.00
$0.00
0%
8/1/2017
5/3/2019
erosion and sediment control
materials.
GeoComponents
9/15/2017
$6,680.00
$0.00
0%
4/23/2019
$134,164.00
$0.00
0%
*Note: Negative values represent reduction in Contract Cost due to scope changes.
TOTAL INCREASE $6,851,277.92
TOTAL DECREASE ($4,378,907.18)
NETTOTAL $2,472,370.74
Attachment 3 — Expense Authorization
Senior
Director or
Procurement
Authorized
Manager
Manager or
Senior
and Legal
Accounting
Controller
CFOO and
Executive
Board of
Buyer
Associate
Director
Services
Services
CEO
Committee
Directors
Director
Procurement
>_ $5,000
>_ $10,000
>_ $50,000
>_ $100,000
>_ $50,000
>_ $100,000
>_ $250,000
>_ $250,000
>_ $500,000
Purchase Order
> $0
PO as
> $0
agreement
Payment
> $0
>_ $10,000
>_ $50,000
> $0
>_ $10,000
Requisition
Attachment 4 - Goods/Services Exempt from Procurement and Purchase Order Approvals
• Customer Refunds;
• Insurance Deductibles;
• Legal Settlements;
• Payroll Requisitions;
• Payments to Current and Past Employees;
• Petty Cash Replenishment/Floats; and
• Payments to Toronto and Region Conservation Foundation.
Attachment 5 — Non -Application Criteria
The following does not apply to the requirements set out in the guidelines:
(a) public employment contracts;
(b) non -legally binding agreements;
(c) any form of assistance, such as grants, loans, guarantees, and financial
incentives;
(d) a contract awarded under a cooperation agreement with an international
cooperation organization if the procurement is financed, in whole or in
part, by that organization, only to the extent that the agreement includes
rules for awarding contracts that differ from the obligations of the CFTA;
(e) acquisition or rental of land, existing buildings, or other immovable
property, or the rights thereon;
(f) measures necessary to protect intellectual property, provided that the
measures are not applied in a manner that would constitute a means of
arbitrary or unjustifiable discrimination for non -Ontario vendors or are a
disguised restriction on trade;
(g) procurement or acquisition of:
(i) fiscal agency or depository services;
(ii) liquidation and management services for regulated financial
institutions; or
(iii) services related to the sale, redemption, and distribution of public
debt, including loans and government bonds, notes, and other
securities;
(h) procurement of:
financial services respecting the management of TRCA financial
assets and liabilities (i.e. treasury operations), including ancillary
advisory and information services, whether or not delivered by a
financial institution;
health services or social services;
(iii) services that may, under applicable law, only be provided by
licensed lawyers or notaries; or
(iv) services of expert witnesses or factual witnesses used in court or
legal proceedings; or
(i) procurement of goods or services:
(i) financed primarily from donations that require the procurement to
be conducted in a manner inconsistent with the CFTA;
by TRCA on behalf of an entity not covered by the CFTA;
between one government body or enterprise and another
government body or enterprise;
(iv) from philanthropic institutions, non-profit organizations, prison
labour, or natural persons with disabilities; or
(v) under a commercial agreement between a procuring entity which
operates sporting or convention facilities and an entity not covered
by the guidelines that contains provisions inconsistent with the
guidelines.
Attachment 6 — Limited Tendering Criteria
Limited tendering may occur for the following circumstances, however, TRCA may elect to conduct a competitive process for transparency,
best value, or other reasons. Consult with Procurement and Legal Services if you are unsure if one of these scenarios exists.
E Mandatory consultation with Procurement and Legal Services is required prior to initiating a limited tendering process.
Scenario
Example
Notes
(a) If conducted a procurement
process in accordance with the
Procurement Policy and provided
(i) No bids were submitted, or no
that the requirements of the
vendors requested participation;
ti n;
original competitive procurement
documentation are not
substantially modified:
Can be used for when none of
the bids have met the minimum
(n) no bids that conform to the essential
scoring requirements in an RFP
requirements of the solicitation
TRCA has asked for A and the
process or all of the bids have
documentation were submitted;
proponent is proposing B.
been disqualified. Not to be used
because TRCA is unhappy with
the bids, or unhappy with the
EL
prices and want to re -scope.
No bidders attend a mandatory
(iii) no bids satisfied the conditions for
bidders meeting or no bidders had
participation; or
specific certification that is
required.
In bidding for public sector
construction work, construction
When rival firms agree to work
(iv) the submitted bids were collusive.
firms would collude in setting
together by setting higher prices
artificially high prices. Firms would
in order to make higher profits.
decide which contracts they
wanted, and rivals would bid
purposefully high price.
(b) if the goods or services can be
Does not apply to massively
supplied only by a particular vendor
(i) the requirement is for a work of art;
A painting by famous painter.
produced works of art (e.g. Ikea
and no reasonable alternative or
art)•
substitute goods or services exist
(ii) the protection of patents, copyrights,
for an of the following reasons:
y g
or other exclusive rights;
IT software.
(iii) due to an absence of competition for
Purchase of rain or stream gauge
technical reasons;
equipment or certain hydraulic
modelling services.
(iv) the supply of goods or services is
Utilities (Bell, Toronto Hydro,
Cannot be legally purchased
controlled by a vendor that is a statutory
Rogers), or the LCBO.
elsewhere.
monopoly;
(v) to ensure compatibility with existing
A piece of equipment won't
goods, or to maintain specialized goods
function unless the part is replaced
that must be maintained by the
or maintenance occurs the
Does not apply to services.
manufacturer of those goods or its
manufacturer or its representative.
representative;
(vi) work is to be performed on property
by a contractor according to provisions of
a warranty or guarantee held in respect
of the property or the original work;
(vii) work is to be performed on a leased
building or related property, or portions
Quadreal is retained to provide
thereof, that may be performed only by
roof repairs at 101 Exchange Ave.
the lessor; or
(viii) the procurement is for subscriptions
to newspapers, magazines, or other
periodicals.
(c) For additional deliveries by the
(i) cannot be made for economic or
Allowed to go back to the
original vendor of goods or services
technical reasons such as requirements
Further improvements to LID tool.
original scope provider but
that were not included in the initial
of interchangeability or interoperability
internal justification is needed as
solicitation, if a change of vendor
with existing equipment, software,
to why it wasn't included in the
for such additional goods or
services, or installations procured under
original scope. Primarily used for
services:
the initial procurement; and
IT procurement.
Contractor is already on site and
During consultation, the scope,
(ii) would cause significant inconvenience
doing work and there is another
risk, value, relativity to the
or substantial duplication of costs for
slope failure and additional work is
project, and the circumstances
TRCA.
required -this would reduce
arising will be examined.
duplication of mobilization costs.
(d) if strictly necessary, and for
Natural disasters, EOC is activated,
reasons of urgency brought about
roof is blown off one of our
by events unforeseeable by TRCA,
residential rental properties
Emergency, not to be used for
the goods or services could not be
(includes work associated with
poor planning.
obtained in time using an open
insurance claims).
competitive procurement;
(e) for goods purchased on a
Wheat, coffee, sugar, fruit, coco,
Not for manufactured products.
commodity market;
precious metals.
(f) if TRCA procures a prototype or
a first good or service that is
TRCA is approached to trial a new
developed in the course of, and for,
product or 3D printing services to
Not used for a pilot project.
a particular contract for research,
create a unique product or part for
experiment, study, or original
a piece of equipment.
development';
OIL
(g) for purchases made under
exceptionally advantageous
conditions that only arise in the
A supplier is going out of business
very short term in the case of
due to bankruptcy or other
unusual disposals such as those
circumm stances and there is a deep
arising from liquidation,
discounted sale.
receivership, or bankruptcy, but
not for routine purchases from
regularvendors;
' Original development of a first good or service may include limited production or supply in order to incorporate the results of field testing and to demonstrate
that the good or service is suitable for production or supply in quantity to acceptable quality standards, but does not include quantity production or supply to
establish commercial viability or to recover research and development costs.
(h) if a contract is awarded to a
winner of a design contest provided
that:
(i) the contest has been organized in a
manner that is consistent with the
principles of the CFTA, in particular
relating to the publication of a tender
notice; and
Cannot limit the contest to
Province of Ontario. Does not
apply to design charrette, or
design build.
(ii) the participants are judged by an
independent jury with a view to a design
contract being awarded to a winner.
(i) if goods or consulting services
regarding matters of a confidential
or privileged nature are to be
purchased and the disclosure of
those matters through an open
competitive procurement process
TRCA requires a consultant to deal
could reasonably be expected to
with an HR issue.
compromise government
confidentiality, result in the waiver
of privilege, cause economic
disruption, or otherwise be
contrary to the public interest z.
z In using limited tendering under this paragraph (i), compliance with Article 516 of the CFTA (Transparency of Procurement Information) is also not required (e.g., the procuring
entity is not required to post award information).
Attachment 7 - Contingency Summary
Contingency Range
# of Contracts
2018
# of Contracts
2019
%of Contracts
2018
% of Contracts
2019
Total Contract Cost
2018
Total Contract Cost
2019
Total Contingency
2018
Total Contingency
2019
0%-9%
55
53
18%
15%
$6,371,848.78
$12,467,383.08
$6,355.00
$5,856.78
10%-15%
199
228
65%
66%
$51,858,325.93
$25,277,437.51
$1,087,486.00
$2,493,681.33
16%-20%
40
53
13%
15%
$4,546,846.61
$8,201,763.15
$143,214.00
$1,363,633.44
21%-30%
12
11
4%
3%
$1,615,582.81
$400,240.62
$33,179.00
$81,244.52
Greater than 30%
1
1
0%
0%
$10,300.00
$45,274.00
$0.00
$12,000.00
TOTAL 3071 3461 100% 100%1 $64,402,904.13 $46,392,098.36 $1,270,234.00 $3,956,416.07
Total Contingency
Total Contingency
Total Contingency
Total Contingency
Total Contingency
Total Contingency
Total Contingency
Total Contingency
Total Awarded
Total Awarded
Approved ($)
Approved ($)
Approved (%)
Approved (%)
Used ($)
used ($)
Used (%)
Used (%)
Bidders
Bidders
2018
2019
2018
2019
2018
2019
2018
2019
2018
2019
$7,084,861.94
$3,956,416.07
12%
9%
$1,270,234.00
$527,295.00
18%
13%
261
379
RES.#A26/20 - SUPPLY OF SHORT-TERM RENTAL VEHICLES
Award of Contract 10022750 for the supply of short-term rental vehicles
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) currently owns and
operates a fleet of 105 motor vehicles and periodically requires Short -Term Rental (STR)
Vehicles to facilitate program operations and the implementation of deliverables during
peak operating season;
AND WHEREAS TRCA staff has identified a need for STR Vehicles during peak operating
season to assist in the implementation of projects and programs having a demand for
fleet resources;
AND WHEREAS TRCA solicited proposals for STR Vehicles through a publicly advertised
process and evaluated the proposals based on pre -established criteria;
THEREFORE, LET IT BE RESOLVED THAT TRCA award contract 10022750 to Thomas
Solutions for the supply of STR Vehicles for a period of three (3) years effective the date
of agreement execution being the highest ranked proponent, having a total cost of
$765,000 plus applicable taxes, to be expended as authorized by TRCA staff;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of 10%
of the contract value, plus applicable taxes, in excess of the contract cost as a
contingency allowance if deemed necessary;
THAT should TRCA staff be unable to negotiate a contract with the above-mentioned
proponent, staff be authorized to enter into and conclude contract negotiations with
other Proponents that submitted proposals, beginning with the next highest ranked
Proponent meeting TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take necessary action to
implement the contract, including obtaining any required approvals and the signing and
execution of any documents and any extension periods as approved.
CARRIED
BACKGROUND
TRCA's Vehicles and Equipment (Fleet) unit provides a range of services to various TRCA
programs which rely on fleet assets to facilitate program operations and complete identified
deliverables.
Peak operating season ranges from March/April through November for most TRCA projects and
programs, however, periodically this extends beyond the typical peak season in some
instances. Demand on TRCA owned fleet increases during this time, however, workload and
scheduling is such that STR Vehicle demand similarly increases for projects and programs.
Analysis of past vehicle rentals has shown approximately 40 STR Vehicles have been required
on an annual basis to support programs. These vehicles range in classification and
configuration pending program requirements.
The duration a STR Vehicle remains in service during the operating season varies pending
project and program requirements, however, this timing typically ranges from two — ten months.
In past operating seasons, STIR Vehicles were acquired on an as -needed basis by various
TRCA programs. To streamline STIR Vehicle demand and improve efficiencies in the
management and oversight of STIR Vehicles the administration and management was brought
under the purvue of the Vehicles and Equipment (Fleet) unit in 2019. It was at this time TRCA
staff acknowledged the need for a long-term vendor and began planning for implementation in
2020 to improve operational efficiencies.
RATIONALE
Contract 10022750 was posted on the procurement portal www.biddingo.com on January 6th 2020
with a closing date of February 6'h, 2020. Questions and or comments related to the contract were
received until January 241, 2020. Questions received were related to clarifications from the scope
of work, subsequently an addendum was posted to www.biddingo.com on January 27'',2020 for
all proponents. A total of ten (10) proponents downloaded the documents and four (4) proposals
were received from the following proponents:
• Discount Car and Truck Rentals
• Enterprise Rent -a -Car
• The Driving Force
• Thomas Solutions
An evaluation committee comprised of staff from TRCA's Corporate Services and Restoration
and Infrastructure Division reviewed the proposals. The criteria used to evaluate and select the
recommended Proponent included the following.
Criteria
Weight % Minimum Score
Proponents Information and
Profile
20
Key Personnel
10 -
Experience and Methodology
20 -
Scope of Work Capabilities
10 -
Sub -Total Proposal
60 30
Pricing
40 -
Sub -Total Pricing
40
Total Points
100
Thomas Solutions achieved the highest overall score based on the evaluation criteria.
Therefore, it is recommended that RFP 10022750 be awarded to Thomas Solutions at a total
annual cost of not to exceed $255,000 plus 10% contingency, plus applicable taxes, it being the
highest ranked proponent meeting TRCA specifications. Proponents scores and staff analysis of
the evaluation results can be provided in an in -camera presentation, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
Funds are available in TRCA Vehicle and Equipment Acquisition fund (701-11) throughout the
duration of the contract.
Report prepared by: Aubrey Orr, extension 5760
Emails: aubrey.orrcDtrca.ca
For Information contact: Aubrey Orr, extension 5760, Mike Ferning, extension 5223
Emails: aurbey.orr(a)trca.ca, mike.fenning(a)trca.ca
Date: February 27, 2020
RES.#A27/20 - VENDOR OF RECORD FOR SUPPLY AND DELIVERY OF VARIOUS
EROSION AND SEDIMENT CONTROL MATERIALS — CONTRACT
EXTENSION
Extension of Contract No. 10020448 expiry date from May 6, 2020 to May
6, 2021.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a variety of
programs/projects that require the utilization of erosion and sediment control materials;
AND WHEREAS TRCA solicited proposals through a publicly advertised process and
awarded Contract No. 10020448 to Armtec-Canada Culvert, Devron Sales Ltd., and
Organic Express Inc. at Board of Directors Meeting RES.#A69/19;
AND WHEREAS staff are satisfied with the goods and services provided to date under
the current contract;
THEREFORE, LET IT BE RESOLVED THAT TRCA staff be directed to exercise their
contractual right to extend the Vendor of Record arrangement with Armtec-Canada
Culvert, Devron Sales Ltd., and Organic Express Inc. for the supply and delivery of
various erosion and sediment control materials for an additional year;
THAT Contract No. 10020448 for supply and delivery of various erosion and sediment
control materials be extended at a total cost not to exceed $472,200, plus applicable
taxes, to be expended as authorized by TRCA staff;
THAT vendors may increase unit rates at the time of extension in accordance with the
original contract terms;
THAT if a situation is present where the vendors of record are not available for a
particular project, staff be authorized to follow the Procurement Policy to retain a vendor;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the vendor of record extension, including obtaining any
necessary approvals and the signing and execution of any documents.
CARRIED
BACKGROUND
TRCA requires various materials for preventing erosion and sediment deposition in waterways
adjacent to a variety of engineering, habitat restoration and trail building projects throughout
TRCA's jurisdiction. Through a VOR arrangement for erosion and sediment control materials,
vendors are authorized to provide these goods and services for a defined period of time and
with fixed pricing. In accordance with the contract documents for the VOR arrangement, staff
may issue Purchase Orders for any vendor on the list with the goods, expertise and experience
required for their project or program requirements.
Furthermore, where the suppliers on the VOR list are not available for a particular project within
the timelines required for TRCA to meet its deliverables, staff are authorized to procure the
required goods and services following TRCA's Procurement Policy. Vendors are required to
provide all resources required to service the divisional or program needs in accordance with
applicable laws, codes, standards, terms and conditions of the vendor of record agreement.
At Board of Directors Meeting #4/19, held on April 26, 2019, Resolution #A69/19 was approved
in part as follows:
THAT TRCA staff be directed to establish a Vendor of Record arrangement with Armtec-
Canada Culvert, Devron Sales Ltd., and Organic Express Inc. for the supply and delivery
of various erosion and sediment control materials for one (1) year with the option to
extend for an additional year, -
RATIONALE
On February 26, 2020 the Evaluation Committee for this contract conducted an annual review of
the performance of vendors for Contract 10020448. The Committee recommended extending
the current contract for an additional year with all vendors, as the value and quality of services
delivered by the vendors under this contract was deemed satisfactory by TRCA staff.
Based on the daily expenditures during the term of the contract, the proposed extension period
from May 6, 2020 to May 6, 2021 will require an increase in value of the contract by $402,550.
An additional $8,050 is required for a potential increase of vendor unit rates by 2%, to account
for Consumer Price Index (CPI) adjustments; plus $61,600 to account for a projected increase
in orders by 15% during the extension term, for a total value of $472,200, plus applicable taxes.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
The anticipated value of the extension of this contract is approximately $472,200 plus applicable
taxes. An increase or decrease in workload will have an impact on the value of this contract. All
vendors on the VOR list understand both the potential cost and resource implications
associated with changes in workload. The services will be provided on an "as required" basis
with no minimum hours guaranteed.
Vendors may increase unit rates, to a maximum of the preceding year's Ontario Consumer
Price Index (Toronto — All Items category) as published by Statistics Canada, at the time of
extension. The most recent data published by Statistics Canada indicates a percentage change
of +1.6 for the period of January 2019 — January 2020; which translates to a 1.6% increase in
vendor unit rates across all material categories. The value increase being proposed for this
contract extension assumes a 2% increase of unit rates at the time of extension (May 6, 2020)
for all Vendors.
Funds for this contract are identified in a variety of capital and cost recoverable project
accounts.
Report prepared by: Alex Barber, extension 5388
Email: alex.barberCa)trca.ca
For Information contact: Moranne McDonnell, extension 5500
Email: moranne.mcdonnell(&trca.ca
RES.#A28/20 - GREENSPACE ACQUISITION PROJECT 2021-2030
Approval of Toronto and Region Conservation Authority's (TRCA)
Greenspace Acquisition Project for 2021-2030.
Moved by: Jack Heath
Seconded by: Steve Pellegrini
THAT the Greenspace Acquisition Project for 2021-2030, as provided in this report be
approved;
THAT the Minister of the Environment, Conservation and Parks be requested to approve
the project pursuant to Section 24 of the Conservation Authorities Act;
THAT authorized TRCA officials be directed to take any necessary action to implement
the Greenspace Acquisition Project 2021-2030;
AND FURTHER THAT staff report back to the Board of Directors on a Greenspace
Securement and Management Plan in Q4 of 2020.
CARRIED
BACKGROUND
TRCA is permitted to secure greenspace in order to provide the programs and services
provided in Section 21 (1) of the Conservation Authorities Act (R.S.O. 1990, c. C.27), which
states:
For the purposes of accomplishing its objects, an authority has power,
c) to acquire by purchase, lease or otherwise and to expropriate any land that it may
require, and, subject to subsection (2), to sell, lease or otherwise dispose of land so
acquired.
Section 24 of the Conservation Authorities Act states:
(1) Before proceeding with a project, the authority shall file plans and a description with
the Minister and obtain his or her approval in writing.
TRCA has received Ministerial approval for past Greenlands Acquisition Projects to meet the
requirements in Section 24 of the Conservation Authorities Act so that land sale funding can be
used to secure lands under the project. Under the project, whenever any land or any use or right
therein is secured, it is being secured for one or more of the following purposes: flood control,
erosion control, bank stabilization, shoreline management works or the preservation of
environmentally sensitive lands. Among other things, Ministerial approval enables TRCA to
acquire land through Crown Right, an exemption under the Planning Act to secure land without
having to follow the municipal consent process under Section 51 of the Planning Act.
The Conservation Authorities Act is currently under review. Should there be changes to the Act
resulting in new considerations, staff will report back to the Board with an updated Greenspace
Acquisition Project.
If it is determined by TRCA that the land, use or right therein, is not being secured for any of
these purposes, TRCA will comply with the consent provisions of the Planning Act (Government
of Ontario, 1990b) prior to securement, as applicable.
RATIONALE
Greenspace Acquisition Project 2021-2030
Land is a foundational piece of TRCA's work. TRCA needs to be able to secure greenspace
expeditiously to deliver its programs and services in a timely and effective manner.
The Greenspace Acquisition Project for 2021-2030, when approved by the Ministry of the
Environment, Conservation and Parks under Section 24 of the Conservation Authorities Act, will
be the chief legal mechanism used by TRCA to secure greenspace lands for their protection.
Criteria for Securement
TRCA has established its criteria for greenspaces to be secured based on Section 20 of the
Conservation Authorities Act and through working with its partner municipalities to deliver
agreed upon projects in support of its vision and updated Strategic Plan. These criteria include:
• Flood control, flood vulnerable, erosion control and reservoir project lands, and
associated access lands
• Valley and stream corridors
• Lake Ontario waterfront
• Environmentally Significant Areas
• Life Science Areas of Natural and Scientific Interest
• Wetlands
• Kettle lake or wetland features
• Highly Vulnerable Aquifers
• Carolinian forest
• Important woodland/vegetation/habitat linkages
• Interior forest areas, and/or lands which contribute to the expansion of interior forest
habitats
• Riparian habitat zones
• Habitat for aquatic and terrestrial species of concern and sensitive species, including
those listed under the Species at Risk Act and the Endangered Species Act
• Lands identified for the target system in TRCA's watershed plans and Terrestrial Natural
Heritage System Strategy and municipal natural heritage systems
• Significant Groundwater Recharge Areas
• Landform Conservation Areas Categories 1 and 2 on the Oak Ridges Moraine
• Lands identified in the Niagara Escarpment Plan, especially Escarpment Natural Areas
and Escarpment Protection Areas
• Lands that provide terrestrial and aquatic habitat restoration opportunities, including
lands identified as priority for ecosystem restoration
• Links for a regional trail system
• Links to greenspace systems in neighbouring conservation authorities
• Lands that are identified by TRCA in cooperation with its member municipalities and/or
the Province of Ontario as being complementary to the TRCA greenspace system
• Lands that provide access to lands secured by TRCA
• Lands that provide a buffer from surrounding land uses to the aforementioned areas.
Factors for Securement
Each potential property will be evaluated on its suitability for securement according to the
following factors:
• The significance of the lands to the greenspace system.
• The nature and immediacy of the threat to the greenspace (such as vacant lots of record
in natural areas which have existing development rights).
• The degree of flood and erosion risk.
• The need for the greenspace to support TRCA projects and programs.
• The relationship of a specific property to those already in public ownership (e.g.,
securing greenspaces around existing TRCA properties which results in larger, more
intact areas that are better buffered from surrounding land uses and which supports
greater protection of people and property).
• The availability of access to the property.
• The ability to achieve an equitable geographic distribution of greenspace.
• The ability of TRCA or other agencies to conserve and maintain the greenspace.
• The availability of alternatives to securement, such as stewardship or regulation.
• The willingness of the owner to enter into negotiations.
• The costs and availability of funding for both securement and long-term management.
Securement Types and Tools
There are several kinds of property ownership. TRCA secures full interest in properties through
fee simple and limited interests through easements, covenants, leases or agreements. Each
has costs and benefits so the appropriate type of ownership to ensure the protection of the
features or functions of the greenspace is determined based on the quality and significance of
available resources.
TRCA uses several tools for securing property rights, including the planning process, arms -
length transaction, donation, land exchange, expropriation, extended tenancy, right of first
refusal, joint ownership, purchase and resale, and agreement. These tools may be used alone
or in combination.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
Strategy 4 — Create complete communities that integrate nature and the built
environment
Strategy 7 — Build partnerships and new business models
Strategy 12 — Facilitate a region -wide approach to sustainability
FINANCIAL DETAILS
Past qreenspace securement funding has varied in source and type of contribution:
Source
Contribution
Participating Municipalities
Capital levy
Securement funding programs
Private Owners
Donation of land as a condition of development
approval
Land exchange includes land and due diligence
costs
Federal Government
Securement funding programs
Provincial Government
Land sale revenue
Local Municipalities
Securement funding programs
Non-government Organizations
Securement funding programs
Donations
Fundraising
Knowledge and information
The City of Toronto primarily conducts their own greenspace securement with certain
exceptions. The regional municipalities of Durham, Peel and York all have greenspace
securement funds to which TRCA is eligible to apply. In addition, these municipalities contribute
to TRCA greenspace securement costs at a rate of $0.70 per $1 in the Regional Municipality of
Peel, $0.50 per $1 in the Regional Municipality of York and $0.40 per $1 in the Regional
Municipality of Durham. TRCA's other participating municipalities do not have similar funding
contribution arrangements. It should be noted that City of Toronto pays for the management of
the majority of TRCA-owned lands within the City under the 1961 and 1972 Management
Agreements.
Once acquired, TRCA manages lands to provide its programs and services. The cost of
managing TRCA lands varies depending on the programs and services to which the land
contributes. These costs will be refined in the Greenspace Securement and Management Plan
being developed by staff.
DETAILS OF WORK TO BE DONE
• Subject to Board of Director's approval, apply for project approval from the Minister of
the Environment, Conservation and Parks.
• Continue to work with TRCA's partner municipalities and other stakeholders to secure
greenspace that supports TRCA programs and services.
• Develop a more detailed Greenspace Securement and Management Plan and report to
the TRCA Board of Directors in Q4 of 2020. The document will explain TRCA's
systematic approach to land acquisition, discuss some priorities for acquisition and
provide transparent rationale as to why properties are acquired and how those lands will
be managed in support of its programs and services.
Report prepared by: Stella Ku, extension 5317; Deanna Cheriton, extension 5204
Emails: stella.ku(aDtrca.ca; dean na.cheriton(a)trca.ca
For Information contact: Deanna Cheriton, extension 5204; Brandon Hester, extension
5767
Emails: deanna.cheriton(cDtrca.ca; brandon.hester(aDtrca.ca
Date: February 10, 2020
RES.#A29/20 - REPORT ON TRCA IN-HOUSE LEGAL CAPACITY AND STATUS OF
CONTINUOUS IMPROVEMENT EFFORTS
Status update on Toronto and Region Conservation Authority (TRCA)
efforts to build in-house legal capacity and investigate further potential
cost savings through efficiencies and cost recovery.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
THAT this staff report regarding TRCA's in-house legal capacity and cost saving
measures involving partner municipalities be received;
AND FURTHER THAT staff be directed to examine opportunities for coordinated
representation of TRCA's interests for Local Planning Appeal Tribunal (LPAT) matters
where feasible.
CARRIED
BACKGROUND
TRCA hired its first in-house legal counsel position in the organization's history in February
2019. This role provides legal advice and support to the Board of Directors, TRCA's Senior
Leadership Team and staff across all divisions in respect of contracts, agreements, claims,
litigation, policies and procedures, legislation, land use and environmental planning matters, real
estate matters, and oversees TRCA's risk management and insurance programs.
Having in-house legal counsel is a best practice for an organization of TRCA's magnitude and
was further driven by an increase in the scope and complexity of TRCA's operations. TRCA's
2020 annual budget, which includes projected expenses in excess of $200 million represents an
increase of over 100% from five years ago (2016), primarily driven by construction contracts for
TRCA projects and fee-for-service agreements with partner municipalities.
TRCA expended over $1 million in external legal fees in 2018.
During discussions with the Board of Directors on various items, questions have been asked on
whether there is further opportunity to reduce or share costs related to legal services. This
status update helps to address those questions.
RATIONALE
Legal services are a corporate service within TRCA's Property and Risk Management business
unit. Direct reports to the Legal Counsel position include a Risk Advisor and a Law Clerk. The
Risk Advisor is responsible for administration of claims and insurance matters and coordinating
TRCA's risk management program. The Law Clerk is a new one-year contract position that will
enable property conveyances and other land transactions, registrations, title searches and lien
checks to be completed in-house. The Law Clerk will also assist with other contracts and
agreements, as assigned.
Legal services provided in-house include:
• Negotiating, drafting and approving contracts and agreements, including Service Level
Agreements and Management Agreements with municipalities;
• Legal advice on planning matters, including development applications and appeals
before the Local Planning Appeal Tribunal;
• Real property matters, including drafting and review of easement agreements, restrictive
covenants and leases;
• Advice on legislation including the Conservation Authorities Act, Planning Act,
Environmental Assessment Act, Municipal Freedom of Information and Protection of
Privacy Act, Conservation Land Act and Construction Act; and
• Retaining external counsel and managing associated legal accounts.
TRCA retains external legal services through a Vendor of Record (VOR) arrangement with
several full service law firms. Currently, TRCA outsources human resources matters, real estate
transactions, complex agreements, specialized legal advice, and litigation including insured
claims. The VOR procurement process was conducted in 2016 and existing agreements cover
the period until January 31, 2021. A new procurement process will be conducted in 2020, and
new agreements will in place when existing agreements expire. A review of external legal
expenditures since 2016 will be conducted to identify cost efficiencies and inform the
procurement process.
The cost of external legal services is born by TRCA with limited exceptions, such as defence
costs for insured claims and land transfers with municipalities. Bringing basic real estate
services and transactions in-house will decrease external legal expenditures. Further, there is
opportunity to consider cost recovery fees for property and legal services as part of updates to
TRCA fee schedules, once Conservation Authority Act amendments come into force.
One opportunity that has been discussed is the notion of sharing the costs of external legal
counsel with partner municipalities, if the municipality and TRCA are aligned. While this
measure could help address some situations where there is alignment between partner
municipality and TRCA, it would remove or limit TRCA's ability to act independently from the
municipality if there was a change in direction by either party. While a joint retainer of counsel
may be possible where a settlement is likely, it is not without risks. Staff will consider this
opportunity based on various factors in the future based on the specific sitaution.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
As legal expenditures exceeded $1 million in 2018, staff project that in-house legal counsel will
result in cost savings from completing selected functions internally. The goal is to advance a
business case through a future budget process to make the Law Clerk position permanent,
through bringing certain real estate services and transactions in house.
DETAILS OF WORK TO BE DONE
Activities to continue to build legal services capacity include:
• Conduct review of external legal expenditures under the existing VOR arrangement.
• Report to Board of Directors on results of the VOR procurement process and execute
new agreements with external legal firms.
• Explore opportunities to coordinate legal representation and share costs with
municipalities, in particular for low risk hearings.
• Subject to Conservation Authorities Act changes and regulations, bring forward for
consideration in TRCA's fee schedules proposed fees for legal agreements and land
transactions on a cost recovery basis.
Report prepared by: Barbara Montgomery, extension 5682
Email: barbara.montgomeryCcDtrca.ca
For Information contact: Barbara Montgomery, extension 5682
Email: barbara.montgomeryCa)trca.ca
Date: March 12, 2020
RES.#A30/20 - CENTENNIAL COLLEGE PROGRESS CAMPUS -MILITARY TRAIL
ROAD MULTI -USE TRAIL
Staff report on the Member Motion regarding the progress on restoration
of connections and bridges between the Centennial College Progress
Campus and Military Trail Road to create a multi -use trail including the
funding required for the project.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
THAT this report on the status to restore connections and bridges between the
Centennial College Progress Campus and Military Trail Road to create a multi -use trail
including the funding required for the project be received;
AND FURTHER THAT staff work with the City of Toronto on this project once it is
identified in a City of Toronto capital plan.
CARRIED
BACKGROUND
TRCA has been in discussion with the City of Toronto regarding the opportunity to create a
multi -use trail in the greenspace of the Highland Creek ravine between the Centennial College
Progress Campus and Military Trail Road in Scarborough (see Attachment 1). The area
includes steep -sloped valleys and is bordered by residential development in the surrounding
tablelands. The land is owned by Toronto and Region Conservation Authority (TRCA) and
managed by the City of Toronto.
The area has an existing trailhead, and a significant amount of capital infrastructure including; a
water access easement, sanitary sewer crossings, revetments, weirs, bed controls, outfalls,
manholes and retaining walls. The City of Toronto's preliminary feasibility assessment has
identified that at least two bridges would be required to cross the Highland Creek in support of a
trail connection.
At the City of Toronto's Public Works and Infrastructure Committee meeting #25/17, held on
November 29, 2017, Item 25.14 was referred to the Budget Committee for consideration in the
2018 budget process as follows:
That City Council request the General Manager, Transportation Services, and the Acting
Chief Financial Officer, to include funding to commence the work to complete the Military
Trail Multi -Use Trail to Centennial College Progress Campus for consideration in the
2018 budget process with other City priorities.
That the General Manager of Transportation Services work in consultation with TRCA
and Parks, Forestry and Recreation to commence the work and restore connections and
bridges between the Centennial College Progress Campus and Military Trail Road.
An update on this proposed project was provided in Attachment 10 of the City of
Toronto's Cycling Network Plan Update as received by City Council at Meeting #9/19, held on
July 16 — 18, 2019. The report indicated that the City Toronto's Transportation Services, Parks,
Forestry and Recreation, and Toronto Water would review this as a future project, but that there
are several higher priority projects to be completed in the area.
At Toronto and Region Conservation Authority's (TRCA) Executive Committee Meeting #11/19,
held on February 7, 2020, Resolution #8150/19 was approved as follows:
THAT the Toronto Region Conservation Authority include funding to plan for the design
and implementation process to complete a Military Trail Multi -Use Trail to Centennial
College Progress Campus in the 2020 budget process;
AND FURTHER THAT Toronto Region Conservation Authority staff report back to the
Board of Directors at the scheduled April 24, 2020 Board of Directors meeting on the
progress to restore connections and bridges between the Centennial College Progress
Campus and Military Trail Road to create a multi -use trail including the funding required
for the project.
RATIONALE
The Highland Creek ravine between the Centennial College Progress Campus and Military Trail
Road is owned by Toronto and Region Conservation Authority (TRCA), however it is managed
by the City of Toronto under the 1972 land management agreements. Therefore, all
management and development costs of this land, including trail management and development,
are the responsibility of the City of Toronto. Accordingly, TRCA has not assigned any budget to
the development of a multi -use trail connection in the area of interest.
This proposed connection is not identified in TRCA's Trail Strategy for the Greater Toronto
Region (Trail Strategy) because it is not classified as a regional trail based on the definition
within the Trail Strategy. It is also not part of The Loop Trail concept identified as part of
implementing the City of Toronto's Ravine Strategy. TRCA does recognize that the proposed
trail would be a connector to the regional trail network as it facilitates connection to the multi -use
trail in The Meadoway.
TRCA staff is working actively with City of Toronto staff to coordinate trail development and
improvement projects in support of the Trail Strategy and City of Toronto priorities. Staff has
reached out to the City of Toronto regarding the Military Trail Multi -Use Trail, and have indicated
the following:
• This area is outside of the key actions and recommendations required to implement the
Ravine Strategy over the next 10 years
• Other large trail initiatives such as The Meadoway and Upper Highland Creek Trail will
provide a more direct connection to this local trail
• Preliminary feasibility of this proposed connection to Centennial College has indicated
that at least two bridges may be required, some of them significant in size, crossing the
Highland Creek
• This is a very challenging project, with a very high cost and it may not even be able to
facilitate the minimum standards of a multi -use for both pedestrians and cyclists
• There are no current capital plans to develop a trail at this location in City of Toronto
Parks, Forestry and Recreation or Transportation Services budgets.
Based on consultations with City of Toronto staff and given the significant and costly
infrastructure that this project would require, TRCA staff believe that planning for this project at
this time is premature and should be deferred until such time as the project is identified in a City
of Toronto capital plan or special project.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
Any TRCA work associated with the development of a multi -use trail connection in the area of
interest will be on a fee-for-service basis under the existing Master Service Agreement with the
City of Toronto.
DETAILS OF WORK TO BE DONE
In support of the Trail Strategy, TRCA will continue to meet with the City of Toronto to
coordinate trail project implementation plans, seek opportunities for partnership, secure
land and easements, and address trail ownership and management.
Report prepared by: Deanna Cheriton, extension 5204
Emails: dean na.cheriton(cDtrca.ca
For Information contact: Deanna Cheriton, extension 5204, Ralph Toninger, extension
5366
Emails: dean na.cheriton(aDtrca.ca, ralph.toninger(CD_trca.ca
Date: March 12, 2020
Attachments: 1
Attachment 1: Centennial College Progress Campus to Military Trail Conceptual Pedestrian
Connection
RES.#A31120 - UPDATE ON PLANNING ACT RELATED MEMORANDUMS OF
UNDERSTANDING AND SERVICE LEVEL AGREEMENTS WITH
PARTNER MUNICIPALITIES
To report back on matters related to Toronto and Region Conservation
Authority's (TRCA) role under the Planning Act when negotiating
Memorandums of Understanding (MOUs) and Service Level Agreements
(SLAs) with Partner Municipalities in the context of the updated
Conservation Authorities Act and enabling regulations.
Moved by: Jack Heath
Seconded by: Joanne Dies
WHEREAS through Bill 108, the More Homes, More Choices Act, the Planning Act was
amended to streamline development approvals processes and facilitate faster decisions
by reducing decision timelines for municipalities and the province;
THEREFORE, LET IT BE RESOLVED THAT given the reduced timelines for application
review under Bill 108, Toronto and Region Conservation Authority (TRCA) staff be
directed when negotiating or updating Memorandums of Understandings (MOUS) and
Service Level Agreements (SLAs) dealing with Planning Act matters, that agreements
include provisions to ensure TRCA can provide comments within the statutory
timeframes;
THAT such provisions provide a mechanism to ensure official plan policies for complete
applications are regularly reviewed to ensure TRCA's requirements are fully reflected;
provide for strengthened coordination with TRCA in the municipality's pre -application
process; and provide for coordinated representation of municipal and TRCA interests for
Local Planning Appeal Tribunal (LPAT) appeals, where feasible;
THAT TRCA continues to work with BILD, consultants, development companies and
municipal partners on updated TRCA guidelines, that help with the streamlining of
applications;
THAT TRCA ensure that any fees for services provided to municipalities that are
recouped from the taxpayers or service users, be collected in accordance with the
Municipal Act as well as the Conservation Authorities Act and associated regulations;
and
AND FURTHER THAT the Clerk and Manager, Policy, so advise BILD, the Clerks, the
Chief Planning Officials, the Chief Financial Officers, and Legal Counsel of our municipal
partners.
CARRIED
BACKGROUND
At Board of Directors Meeting #11/19, held on January 24, 2020, Resolution #A237/19
regarding the "Update on Memorandums of Understanding and Service Level Agreements with
Partner Municipalities' report was approved as follows:
WHEREAS Toronto and Region Conservation Authority (TRCA) RES. #A121/19,
adopted at the June 21, 2019 Board of Directors meeting, directed staff to pursue and
execute updated Memorandums of Understanding (MOUS) and Service Level
Agreements (SLAs) with its partner municipalities in accordance with the amendments to
the Conservation Authorities Act made by Bill 108 and designed to improve
accountability and transparency around the work of conservation authorities funded by
municipalities;
AND WHEREAS the Conservation Authorities Act amendments prompt the need for
agreements for non -mandatory programs and services to be negotiated with regional
municipalities, City of Toronto and lower tier municipalities as part of the transition plan
process following proclamation of the enabling regulations associated with the Bill 108
amendments to the Conservation Authorities Act,
AND WHEREAS TRCA delivers a significant amount of value-added services to its
partner municipalities that will be further strengthened through SLAs, where formal
agreements do not currently exist;
AND WHEREAS TRCA staff have held numerous meetings with municipal
representatives in our jurisdiction since receiving Board of Directors direction on June
21,2019;
THEREFORE, LET /T BE RESOLVED THAT staff continue to work with partner
municipalities to execute updated MOUS and SLAs based on mutually agreed upon
services;
THAT the Board of Directors representatives in lower tier municipalities request support
from their municipal staff in ensuring that consideration is given for TRCA to be relieved
from standard purchasing requirements based on their unique expertise and within the
scope and mandate of the Conservation Authorities Act (e.g. flood and erosion
management) in a manner similar to the City of Toronto and other municipalities in our
jurisdiction;
THAT staff be directed when negotiating MOUs and SLAs that where there is any
conflict between an upper and lower tier municipality for any services related to Planning
Act matters, the municipality that is deemed the approval authority under the Planning
Act shall prevail;
THAT staff report back to the Board of Directors on the progress of these agreements
once draft Conservation Authorities Act regulations are released,
AND FURTHER THAT the Clerk and Manager, Policy, so advise municipal partners.
Further to the above, staff were directed to report back to the February 7, 2020 Executive
Committee meeting on the potential implementation of the following proposed amendments to
Resolution #A237/19:
Resolution #A238/19 (Amendment 1): THAT with Planning Act matters, given the
reduced timelines for application reviews under BN 108, if staff are unable to meet
review timelines as needed by the upper or lower tier municipality as applicable, that the
MOUS and SLAs include clauses whereby TRCA not be held liable for any ramifications
with terms such as "opt out" clauses at the Parties discretion.
Resolution # A239119 (Amendment 2): THAT staff ensure that any fees for services
provided to municipalities that are recouped from the taxpayers or service users, be
collected in accordance with the Municipal Act as well as the Conservation Authorities
Act.
This report was deferred to the March, (and subsequently the April), meeting of the Board of
Directors in order to allow for sufficient review of the implications of the proposed amendments
by TRCA's Legal Counsel and senior staff and the state of emergency declared by the Province.
RATIONALE
Toronto and Region Conservation Authority (TRCA) provides technical support to its municipal
partners through Memorandums of Understanding and Service Level Agreements in
implementing the natural heritage, natural hazard and water resource policies of municipal and
provincial plans. In working with approval authorities, along with private and public proponents,
TRCA supports comprehensive planning to ensure development and infrastructure are
adequately set back and protected from natural hazards and environmentally sensitive areas. In
addition to our role as an agency delegated the responsibility to represent the provincial interest
on natural hazards under Section 3.1 of the Provincial Policy Statement (PPS), TRCA achieves
these goals in the following capacities:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• A regulatory authority under section 28 of the Conservation Authorities Act;
• A Source Protection Authority under the Clean Water Act;
• A service provider to our municipal partners;
• A watershed -based resource management agency; and
• A landowner, being second only to the Province in amount of land ownership in TRCA
watersheds.
In these roles, consistent with the Province's "Policies and Procedures for Conservation
Authority Plan Review and Permitting Activities', TRCA works in collaboration with
municipalities and stakeholders to protect people and property from flooding and other natural
hazards and to conserve natural resources.
Resolution #A238119 (Amendment 1)
TRCA recognizes the importance of certainty, efficiency, transparency and accountability in the
development review process, so that quality housing supply and supporting infrastructure can
be brought to market in a timely and environmentally sustainable manner. TRCA's past and
ongoing efforts to increase operational efficiencies, streamline processes and enhance
customer service, which collectively aim to support and contribute to provincial priorities to
streamline the planning and development approvals process, were outlined in a report to the
Board of Directors on March 29, 2019. Since that time, staff have been working closely with
our municipal partners, the development community, (BILD, individual development companies,
consultants and proponents) and Conservation Ontario to continue these efforts.
Through Bill 108, the More Homes, More Choices Act, the Planning Act was amended to
streamline development approvals processes and facilitate faster decisions by reducing
decision timelines for municipalities and the province to 120 days for official plans and
amendments, 90 days for zoning by-laws and amendments (except where there is a concurrent
official plan amendment) and 120 days for plans of subdivision. In our submission to the
Province when these amendments were proposed, TRCA advised that it would be a significant
challenge to meet these proposed timelines without, requiring complete information early in the
planning process. TRCA finds that when efforts to compile all required information to make
decisions are done well and made early, it leads to innovative more sustainable and approvable
urban designs that result in shorter review times, more timely approvals by TRCA and by others,
and cost reductions in the short and long term for all stakeholders. This collaborative approach,
which includes the provision of high quality information in appropriate formats at the front end of
the development process, also helps to avoid appeals to the Local Planning Appeal Tribunal
(LPAT) thus avoiding delays, costs and uncertainty associated with these appeals processes.
Accordingly, TRCA recommended the shortening of timelines be coupled with mandatory or
strengthened requirements for pre -consultation and the upfront submission of complete
applications with all supporting technical studies to enable timely municipal and agency reviews.
A similar recommendation was made by TRCA in response to the recent review of the
Provincial Policy Statement (PPS). These recommendations were unfortunately not addressed
in the legislation but TRCA continues to advocate for, and work with BILD, consulting
companies, and developers to stress the importance of the approach.
Staff have considered the issue of how MOUs and SLAs can respond to the challenge of
reduced timelines for application review under the Planning Act. Staff recommend MOUS and
SLAs include clauses to ensure TRCA can provide its comments within the statutory
timeframes. In cases where TRCA staff are unable to meet review timelines and complete
applications as a means of streamlining for reasons, including but not limited to, missing or lack
of required information, comments should be provided as soon thereafter as possible. Clauses
within the MOUs and SLAB should also address these situations to ensure that TRCA's
legislated and provincially delegated and regulatory interests are addressed. Municipalities and
approval authorities rely on TRCA's technical advice to ensure decisions on planning
applications conform to official plans and are consistent with the PPS. It is therefore
recommended that given the reduced timelines for application review under Bill 108, MOUS and
SLAs dealing with Planning Act matters shall ensure TRCA can provide comments within the
statutory timeframes by including provisions that:
• Provide a mechanism to ensure official plan policies for complete applications
are regularly reviewed to ensure TRCA's requirements are fully reflected;
• Provide for strengthened coordination with TRCA in the municipality's pre -
application process; and
• Provide for coordinated representation of municipal and TRCA interests for LPAT
appeals, where feasible.
Resolution # A239/19 (Amendment 2):
TRCA supports a cost recovery approach to setting its fees, consistent with the Municipal Act
and the Planning Act. Under the Municipal Act, municipalities may enact bylaws to impose fees
and charges for services or activities, or for the use of its property including property under its
control. Generally, such fees and charges are determined on a cost recovery basis, as there
must be a reasonable relationship between the fee or charge and the cost to deliver the service.
Similarly, under the Planning Act municipalities may establish fees for the processing of
planning applications, designed to meet only the anticipated cost in respect of the processing of
each type of application.
In a similar fashion to municipal partners, TRCA assesses fees for services to recover the costs
of delivering the services. Currently, TRCA follows the Ministry of Natural Resources and
Forestry (MNRF) Policies and Procedures for Charging of Conservation Authority Fees and
TRCA's Planning, Permitting and Environmental Assessment Fees Policy/Guideline 2009,
approved at Authority Meeting #10/09, held on January 8, 2010, Resolution #232/09. In 2011,
the Authority directed staff to achieve full cost recovery for eligible planning and development
services. TRCA reached 100% cost recovery in 2015 and have maintained it since that time.
Fee schedules have been approved by the Board of Directors on a biannual basis. A base fee
adjustment for cost of living has been applied for every two years, in addition to the provision of
a comprehensive level of service /cost recovery assessment. Prior to seeking Board approval
of the fee schedules, it has been TRCA's practice to consult with members of BILD on the
proposed fee schedules and cost recovery assessment.
Pursuant to the Bill 139 amendments to the Conservation Authorities Act in 2017, which are not
yet in force, the Minister may determine classes of programs and services in respect of which a
conservation authority may charge a fee, and enact regulations respecting the amounts of fees
that may be charged for a program or service, including the manner in which fees are
calculated. If no amount is prescribed, the fee is the amount determined by the authority.
Subject to the Conservation Authorities Act and any new enabling regulations, TRCA will
continue to establish its fee schedules based on the principle of cost recovery consistent with
current provincial MNRF procedures and TRCA policy.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
Staff are engaged in this legislative review, MOU/SLA, and policy analysis work per the normal
course of duty with funding support provided by TRCA's participating municipalities to account
120-12.
DETAILS OF WORK TO BE DONE
TRCA staff will communicate to the Board of Directors, municipal partners and relevant
stakeholders, once known, information related to the draft enabling regulations under the
Conservation Authorities Act. Staff will continue to meet with municipal partners and seek
opportunities to ensure TRCA's requirements are fully reflected as part of a complete
application under the Planning Act and to strengthen coordination with TRCA in the municipal
pre -application process in an effort to meet the reduced timelines for application review under
Bill 108.
Report prepared by: Laurie Nelson, extension 5281; Barbara Montgomery, extension
5682
Emails: laurie.nelson(aDtrca.ca, barbara.montgomery(a)trca.ca
For Information contact: Laurie Nelson, extension 5281; Barbara Montgomery, extension
5682
Emails: laurie.nelson(cDtrca.ca, barbara.montgomery(a?trca.ca
Date: March 20, 2020
RES.#A32/19 - NEW EROSION AND SEDIMENT CONTROL GUIDE FOR URBAN
CONSTRUCTION
Board endorsement of the Erosion and Sediment Control (ESC) Guide for
Urban Construction and a development review streamlining initiative for
construction sites applying continuous monitoring. The Guide was
circulated for comments and is now finalized for use in the review of ESC
submissions under planning, environmental assessment and TRCA
permit processes.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS over 2018 and 2019, based on up-to-date knowledge from science and
practice, Toronto and Region Conservation Authority (TRCA) staff developed the draft
Erosion and Sediment Control (ESC) Guide for Urban Construction (hereafter referred to
as `the Guide") as an update to the 2006 Greater Golden Horseshoe Area Conservation
Authorities ESC Guideline for Urban Construction, and to provide updated information
on TRCA expectations related to the design of ESC plans and reports subject to TRCA
review, and the inspection and maintenance of ESC measures during construction;
AND WHEREAS in 2019, TRCA staff sought and received input on the draft Guide from
provincial agencies, conservation authorities, municipalities, and private sector
stakeholders, including the Building Industry and Land Development Association (BILD),
and the Greater Toronto Sewer and Watermain Contractors Association, and have now
finalized the Guide;
THEREFORE LET IT BE RESOLVED THAT the Board of Directors endorse the Erosion
and Sediment Control Guide for Urban Construction for use, beginning in September
2020, by public and private proponents of construction projects and TRCA staff involved
in the development review and approval processes, and enforcement;
THAT in the time leading up to the Guide coming into effect in TRCA's jurisdiction in
September 2020, TRCA conduct training workshops for staff, municipal partners and
practitioners in the development industry, recognizing changing COVID-19 directives, in
order to allow all stakeholders to become familiar with how the Guide will be applied in
the review and approval of development applications;
THAT TRCA staff establish a voluntary program to allow for streamlined review and
approvals of ESC submissions (plans and reports) for construction projects where the
proponent agrees to institute continuous real-time turbidity (suspended sediment
concentration) monitoring to evaluate their compliance with the turbidity targets defined
in the Guide;
AND FURTHER THAT TRCA assesses, over a three year period, the extent to which
turbidity targets are being achieved by collecting information from pilot sites that are
applying continuous turbidity monitoring, and, at that point in time, re -consider the
targets and best management practices recommended in the Guide as needed.
CARRIED
BACKGROUND
The Greater Golden Horseshoe Area Conservation Authorities ESC Guideline for Urban
Construction was published in December 2006, received TRCA board approval, and was
adopted by nine conservation authorities in the Greater Golden Horseshoe Area. For the past
13 years the Guideline has been used as the basis for review of ESC submissions at TRCA.
Since its release there have been many significant and fundamental changes in the field of
ESC, including greater availability of professional training programs, new policies for the
protection of species at risk and other legislative changes, emergence of new products and
techniques, and advancements in our knowledge of optimal application of best practices. The
new ESC Guide for Urban Construction has been developed in order to address this evolution,
providing current, concise, relevant and solution -oriented ESC guidance. The information
contained in the new Guide details TRCA expectations for ESC submissions, the review of
which is a mandated CA responsibility.
The Guide was scoped in co-operation with an advisory committee comprised of
representatives from various stakeholder groups, including the construction and development
industry, product suppliers, federal, provincial and municipal government, conservation
authorities, and academia. The draft Guide completed in March 2019 was thoroughly vetted
through senior technical and planning staff, and was widely circulated to external stakeholders.
Following an announcement at TRIECA 2019, the guide was circulated to the advisory
committee and then disseminated to key CA and municipal stormwater contacts by
Conservation Ontario, the Municipal Stormwater Discussion Group and the Municipal Engineers
Association. The draft was downloaded over 1,300 times during this review period. During the
public review period staff offered a training webinar and provided presentations to BILD, the
Ministry of Environment, Conservation, and Parks (MECP), the Municipal Stormwater
Discussion Group, and other stakeholder groups. Based on the feedback received through this
external review process, TRCA staff have now revised and finalized the Guide for staff use in
the review of ESC submissions under planning, environmental assessment and TRCA permit
processes.
It is anticipated that other CAs will adopt this Guide in their jurisdictions as a replacement for the
2006 Guideline, as many have indicated their intention to do so. During consultation with the
development industry, representatives often expressed their desire for a more consistent
approach to the review of development applications among CAs. In order to facilitate the
adoption of the new Guide by other CAs, the information contained therein was intentionally
kept general enough to be applicable in other jurisdictions in Ontario. Through consultation
with MECP, it was also determined that adherence to the Guide will be listed as a criterion for
pre -approval of stormwater management projects in the MECP's forthcoming linear
consolidated permissions initiative, which will see the establishment of system -wide
environmental compliance approvals for stormwater infrastructure.
RATIONALE
Ontario CAs are responsible for reviewing, commenting on and approving ESC plans as
regulators issuing permits under section 28 of the Conservation Authorities Act, and also as part
of their delegated responsibilities under the Ontario Planning Act. On sites that are determined
to be within the CA's area of interest, applications are circulated to the CA for comment. CA
areas of interest include, but are not limited to: features and hazards governed under the
"Regulation of Development, Interference with Wetlands and Alterations to Shorelines and
Watercourses" regulations, areas requiring special stormwater management controls, Areas of
Natural and Scientific Interest, Environmentally Significant Areas, and CA property. CAs are
required to provide technical review and commentary regarding how the proposal would impact
natural hazards or natural heritage features and functions. In the absence of appropriately
designed, installed and maintained ESC measures, construction activities can result in de-
stabilized land, increased erosion risk, and the transport of sediment offsite and into natural
features and other private property
Among Ontario's conservation authorities, TRCA has for over a decade acted as a leader in the
field of construction site erosion and sediment control, serving to advance the state of practice
by conducting research, offering professional training programs (e.g. Canadian Certified
Inspection of Sediment and Erosion Control), and developing resources and guidance to
educate the industry on best practices. Having also led the development of the 2006 Guideline,
TRCA has continued to show leadership by developing the new Guide, in partnership with
Credit Valley Conservation, which advances the conversation around ESC further by advocating
for more progressive approaches, such as the adoption of performance-based targets for
turbidity levels in construction runoff, and the use of erosion risk assessment outcomes to
inform ESC plan design.
By establishing clear and consistent turbidity targets for construction sites, and a protocol for
how compliance with those targets is measured, both the development industry and regulatory
agencies stand to benefit. The adoption of turbidity (or suspended solids) targets for
construction site runoff is seen in many other jurisdictions in North America, including locally
through the Silt Smart Protocol established by Credit Valley Conservation, the Ministry of
Natural Resources and Forestry, the Ministry of Environment, Conservation and Parks, and
Fisheries and Oceans Canada. The approach represents a shift towards performance based
monitoring and away from being prescriptive in terms of the specific types of controls that
should be applied on the construction site. This performance based approach emphasizes the
continuous assessment of ESC performance and promotes more rigorous inspection and timely
response to elevated sediment releases because they are being identified in real time.
Further, the turbidity targets and continuous monitoring guidance set out in the Guide will be
applied as the foundation of a streamlining initiative for review and approval of ESC
submissions. A voluntary program will be established to provide streamlined and expedited
review on construction projects where the proponent agrees to institute continuous real-time
turbidity monitoring to evaluate their compliance with the turbidity targets defined in the Guide
This addresses strategy #4 in the Updated TRCA Strategic Plan, which specifically speaks to
identifying opportunities to facilitate more timely reviews as part of the development review
process.
Content of the Guide
The Guide provides practitioners, developers and regulatory agencies with up-to-date, relevant,
clear and practical information on the effective application of erosion and sediment control
measures. The Guide addresses the following specific objectives:
• Defines key terms and concepts necessary for understanding the science of erosion,
sediment transport and sedimentation
• Defines erosion risk assessment methods and how risk assessment outcomes can aid in
the selection of best management practices
• Details strategies for effective application of ESC through all stages, including plan design,
installation, inspections, maintenance, and decommissioning
• Provides guidance on protecting certain vulnerable features from impacts of nearby
construction, such as low impact development areas and natural water features
• Clarifies ESC plan submission requirements and approvals processes
• Clarifies the roles and responsibilities of all parties involved in ESC
• Outlines expectations for ESC inspections and performance monitoring on construction
sites, including turbidity targets for receiving water systems and construction effluent
• Provides updated guidance on best management practices for erosion prevention, erosion
control, sediment control, and isolation of in -water works
• Provides a summary of relevant legislation and how it governs construction activities
Feedback received during draft review
During the comment period, representatives from BILD and the Greater Toronto Sewer and
Watermain Contractors Association provided feedback on the new construction site turbidity
targets in the Guide, expressing some concern that they would be challenging to achieve using
current best practices. TRCA staff re -considered the targets in light of past research on
construction sites and experiences with the Silt Smart Protocol, and developed revised targets
that will provide more flexibility for proponents while still promoting a performance based
approach that encourages more rigorous site inspection and quick problem response.
Written and verbal comments submitted by conservation authorities, provincial ministries,
municipalities, and other private sector practitioners were addressed through several fairly minor
revisions made throughout the Guide. Feedback was generally positive and comments did not
suggest the need for any fundamental changes to the content of the Guide.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built
environment
Strategy 8 — Gather and share the best sustainability knowledge
Strategy 10 — Accelerate innovation
FINANCIAL DETAILS
The development of the ESC Guide was supported through capital funding to account 416-96
(Sustainable Technologies Evaluation - Clean Water) from the regional municipalities of
Toronto, Peel and York. Staff secured additional funding (into account 416-96) for the
development of the Guide from the Toronto and Region Remedial Action Plan. Credit Valley
Conservation provided in-kind support to the development of the Guide by developing content
and attending working meetings to help navigate key issues. Moving forward, costs incurred to
develop and deliver the planned training events associated with the Guide will be recovered
through participant registration fees.
DETAILS OF WORK TO BE DONE
The Guide will be rolled out over four months, with TRCA-wide adoption planned for September
2020. Leading up to this date, TRCA staff will hold at least one internal training workshop with
all staff involved in review and approval of ESC plans and construction site enforcement. This
workshop will help to establish how the adoption of the new Guide will change the review and
approval of ESC submissions, and contribute to defining the key aspects of the voluntary
program that will be established to offer streamlined approvals for continuously monitored
construction sites. Following this internal workshop, training will also be offered to development
industry professionals and municipal staff, with the number of events or webinars to be
determined based on demand. The training offered will focus primarily on new aspects of the
Guide, providing the information necessary to allow practitioners to develop ESC submissions
that adhere to the Guide. Providing this internal and external training to all the practitioners
involved in ESC plan development, review and approvals, and enforcement will ensure a
seamless transition when the new Guide is adopted in September 2020.
The second aspect of the roll out is the establishment of the voluntary program to provide
streamlined and expedited review on construction projects that institute continuous real-time
turbidity monitoring. The parameters of the program will be established by TRCA staff in the
various groups involved in development review and enforcement. It will be finalized and
published prior to the September 2020 adoption date for the Guide. As proponents sign onto
this voluntary program, monitoring outcomes and practitioner experiences will be thoroughly
documented to help inform program improvements and future updates to the Guide.
Report prepared by: Lisa Rocha, extension 5786
Emai Is: lisa.rocha(cDtrca.ca
For Information contact: Lisa Rocha, extension 5786
Emai Is: lisa.rocha(rDtrca.ca
Date: February 3, 2020
Attachments: 1
Attachment 1: Erosion and Sediment Control Guide for Urban Construction (TRCA, 2019)
Sustainable Technologies
EVALUATION PROGRAM
Prepared by:
Toronto and Region Conservation Authority
2019
www.sustainabletechnologies.ca
The water component of STEP is a collaborative of.-
Lake
f:
Lake Simcoe Region Credit Valley
conservation authority COnSerVOYIOn Toronto and Region
Conservation
inspired by nature Authority
Erosion and Sediment Control Guide for Urban Construction
PUBLICATION INFORMATION
This guide represents a major update to the Greater Golden Horseshoe Area Conservation Authorities
Erosion and Sediment Control Guideline for Urban Construction (2006), and supersedes the earlier
document. It has been prepared by the Toronto and Region Conservation Authority (TRCA) under the
Sustainable Technologies Evaluation Program (STEP).
Citation: Toronto and Region Conservation Authority (TRCA). 2019. Erosion and Sediment Control
Guideline for Urban Construction. Toronto and Region Conservation Authority, Vaughan, Ontario.
Documents prepared by the Sustainable Technologies Evaluation Program (STEP) are available at
www.sustainabletechnologies.ca. For more information about this or other STEP publications, please
contact:
Lisa Rocha
Project Manager, Sustainable
Technologies
Toronto and Region
Conservation Authority
E-mail: I roc h a @t rca. o n. ca
Tim Van Seters
Manager, Sustainable
Technologies
Toronto and Region
Conservation Authority
E-mail: tvanseters@trca.on.ca
Glenn MacMillan
Senior Manager, Water and
Energy
Toronto and Region Conservation
Authority
E-mail: gmacmillan@trca.on.ca
THE SUSTAINABLE TECHNOLOGIES EVALUATION PROGRAM
The water component of the Sustainable Technologies Evaluation Program (STEP) is a partnership
between Toronto and Region Conservation Authority (TRCA), Credit Valley Conservation and Lake
Simcoe Region Conservation Authority. STEP supports broader implementation of sustainable
technologies and practices within a Canadian context by:
• Carrying out research, monitoring and evaluation of clean water and low carbon technologies;
• Assessing technology implementation barriers and opportunities;
• Developing supporting tools, guidelines and policies;
• Delivering education and training programs;
• Advocating for effective sustainable technologies; and
• Collaborating with academic and industry partners through our Living Labs and other initiatives.
Technologies evaluated under STEP are not limited to physical devices or products; they may also
include preventative measures, implementation protocols, alternative urban site designs, and other
innovative practices that help create more sustainable and liveable communities.
Toronto and Region Conservation Authority Page i
Erosion and Sediment Control Guide for Urban Construction
ACKNOWLEDGEMENTS
The content herein was provided by the following contributors:
Dan Hippie (TRCA)
George Golding (CVC)
Gretel Green (TRCA)
Jennifer Dougherty (CVC)
Jill Attwood (TRCA)
Katharine McCarter (TRCA)
Lisa Rocha (TRCA)
Maria Parish (TRCA)
Michael Yu (TRCA)
Moranne McDonnell (TRCA)
Sarah Gates (TRCA)
Tim Van Seters (TRCA)
Funding support for this document was generously provided by:
• Toronto and Region Remedial Action Plan
• City of Toronto
• Region of Peel
• York Region
NOTICE
While support was received from the above noted individuals and agencies to prepare this document, such
support does not indicate their endorsement of its contents. Although every reasonable effort has been
made to ensure the integrity of the contents of this document, the supporting individuals and agencies do
not make any warranty or representation, expressed or implied, with respect to the accuracy or
completeness of the information contained herein. Mention of trade names or commercial products does
not constitute endorsement or recommendation of those products. While some parts of this document
provide general information of a legal nature, it does not contain a full analysis of the law nor does it
constitute an opinion on the points of law discussed.
Toronto and Region Conservation Authority Page ii
Erosion and Sediment Control Guide for Urban Construction
TABLE OF CONTENTS
1.0 Introduction..........................................................................................................1
2.0 Objectives.............................................................................................................2
3.0 Application........................................................................................................... 3
4.0 The Basics: Erosion, sediment transport and sedimentation.......................................4
4.1 Understanding erosion.........................................................................................4
4.2 Understanding suspended sediment and sedimentation.............................................5
4.3 The impacts of construction activities... ....... ...... .................. ....... ................... 6
4.3.1 Impacts to aquatic community health..............................................................7
4.3.2 Water quality degradation............................................................................ 9
4.3.3 Alterations to hydrological regime and geomorphology.......................................9
4.4 What is erosion and sediment control?
IQ
5.0 Participant roles and responsibilities.......................................................................12
6.0 Assessing existing conditions and erosion risk.........................................................18
6.1 Collecting and analyzing site information.................................................................18
6.2 Erosion risk assessment......................................................................................18
39
6.2.1 When to do an ERA.....................................................................................18
33
6.2.2 Sites for which an ERA should be completed ....................................................
19
6.2.3 Hybrid qualitative ERA approach....................................................................19
34
6.2.4 Selecting BMPs based on erosion risk............................................................
23
6.2.5 ERA submission components........................................................................
25
7.0 ESC plan design....................................................................................................26
7.1 Key principles....................................................................................................26
7.2 Staged ESC planning..........................................................................................29
7.3 BMP selection....................................................................................................33
39
7.3.1 Erosion prevention......................................................................................
33
7.3.2 Erosion control...........................................................................................33
7.3.3 Stormwater detention..................................................................................
34
7.3.4 Flow interruption.........................................................................................35
7.3.5 Filtration...................................................................................................
35
7.3.6 Flocculation... .....................................................................
...................... 35
7.4 Dewatering protocols and best practices.................................................................
35
7.5 Protecting aquatic habitat during in and near water works ...........................................
39
7.5.1 In -water work.............................................................................................40
7.5.2 Near -water work.........................................................................................42
7.5.3 Effective design for in and near -water work......................................................42
Toronto and Region Conservation Authority Page iii
Erosion and Sediment Control Guide for Urban Construction
7.6 Protection low impact development sites.................................................................45
7.6.1 General best practices for LID protection.........................................................46
7.6.2 Protecting filtration and infiltration LIDs — flow diversion......................................47
7.6.3 Protection filtration and infiltration LID areas used for temporary stormwater
detention.......................................................................................................... 49
7.6.4 Protecting underground LIDs........................................................................50
7.7 Spill response and control plan..............................................................................52
7.7.1 Spills prevention.........................................................................................52
.7.2 Spill response............................................................................................ 53
8.0 ESC plan submission requirements.........................................................................55
8.1 Requirements for early stages of planning and design................................................56
8.2 Requirements for intermediate stages of planning and design ..................................... 57
8.3 Requirements for detailed design stages of planning and design..................................58
9.0 Approvals process.................................................................................................67
10.0 Inspections, monitoring and maintenance...............................................................72
10.1 Developing an inspection program......................................................................72
10.1.1 ESC inspector qualifications.....................................................................73
10.1.2 Inspection frequency...............................................................................73
10.1.3 Inspection documentation and reporting......................................................74
10.1.4 On-site reference tools...............................................................................
75
10.2 ESC performance monitoring................................................................................76
10.2.1 Site specific turbidity monitoring protocols....................................................77
10.2.2 Turbidity targets for construction runoff and downstream receivers ................... 78
10.2.3 Response protocols for turbidity exceedances..............................................87
10.3 BMP maintenance...........................................................................................89
APPENDIX A: Specified Flood Risk Calculation
APPENDIX B: Erosion Control (B1) and Sediment Control (B2) Best Management Practices
APPENDIX C: Best Management Practices for In and Near Water Works
APPENDIX D: Summary of Legislation Relevant to ESC
APPENDIX E: Erosion Risk Assessment Approaches
APPENDIX F: ESC Inspection Report Template
APPENDIX G: Restoration Guidelines
APPENDIX H: References List
Toronto and Region Conservation Authority Page iv
Erosion and Sediment Control Guide for Urban Construction
1.0 INTRODUCTION
Change is inherent to the land development process; the removal of vegetation, stripping of topsoil and
alterations to topography and drainage patterns are common practices during the construction of
infrastructure like buildings, roads, bridges and sewers. Without careful planning and oversight focused
on minimizing these changes and mitigating their impacts, construction projects can have adverse
impacts on adjacent and downstream natural features and other private property.
The release of sediment laden runoff and dust from construction sites can have a range of adverse
impacts, including but not limited to the following:
• Excessive levels of deposited and suspended sediment in lakes, rivers and wetlands decreases the
productive capacity of aquatic habitats and increases the frequency of dredging in reservoirs.
• Sediment deposited on gravel stream beds compromises spawning and alters the habitat of bottom -
dwelling organisms and young fish.
• Elevated concentrations of suspended sediments in natural water features can cause abrasion of
gills, a reduction in visibility required for breeding and feeding, and decreased sunlight penetration,
which inhibits photosynthesis by algae and aquatic plants.
• Sediment can also carry other contaminants into receiving waters, including heavy metals and
nutrients, which tend to bind to these particles.
• Vehicle tracking of sediment offsite results in sediment laden roads, and increased sediment loads to
the storm sewer system and ultimately, to the receiving waters to which they discharge.
• Wind blown dust from construction sites can impair air quality and become deposited onto adjacent
areas, including natural features, roads, residences and other private property.
Erosion and sediment controls (ESC) are technologies, practices and procedures that are applied to
prevent the release of sediment from construction sites. They may include installed structural measures,
like sediment control ponds and erosion control blankets, or improved design practices, like phased land
stripping and riparian zone preservation.
As many previously rural municipalities in Ontario undergo rapid urbanization and growth, the adoption of
effective and innovative approaches to ESC is of paramount importance. Moving forward, the application
of effective ESC measures that are properly installed, inspected and maintained will be essential to
mitigating sediment discharge from construction sites and protecting our natural features.
Toronto and Region Conservation Authority Page 1
Erosion and Sediment Control Guide for Urban Construction
2.0 OBJECTIVES
The practice of erosion and sediment control in Ontario has progressed in significant ways since the
release of the 2006 Greater Golden Horseshoe Area Conservation Authorities Erosion and Sediment
Control Guideline for Urban Construction. As awareness of the importance of mitigating construction
related environmental impacts has also continued to grow there have been many significant and
fundamental changes in our knowledge and understanding of ESC best practices. Some of the more
significant changes include:
• Expanded availability of ESC training programs and greater numbers of professionals engaging
in training;
• Introduction of new policies to ensure protection of species at risk;
• Introduction of new legislation and changes to existing acts and regulations;
• Emergence of new ESC products and techniques;
• Improved understanding related to the application of ESC products for optimal effectiveness; and
• Recognition of the limitations of some older and more conventional ESC approaches.
The overarching objective of this document is to provide ESC practitioners, developers and regulatory
agencies with up-to-date, relevant, clear and practical guidance on the effective application of erosion and
sediment control measures. Specific objectives include:
• Define key terms and concepts necessary for understanding the science of erosion, sediment
transport and sedimentation
• Define quantitative and qualitative erosion risk assessment methods and how risk assessment
outcomes can aid in the selection of best management practices
• Detail strategies for effective application of ESC through all stages, including plan design, installation,
inspections, maintenance, and decommissioning
• Clarify ESC plan submission requirements and approvals processes
• Clarify the roles and responsibilities of all parties involved in ESC
• Outline expectations for ESC inspections and performance monitoring on construction sites, including
turbidity targets for receiving water systems and construction effluent
• Provide updated guidance on best management practices for erosion prevention, erosion control,
sediment control, and isolation during in- or near -water works
• Provide a summary of relevant legislation and describe how they govern construction activities related
to ESC
Toronto and Region Conservation Authority Page 2
Erosion and Sediment Control Guide for Urban Construction
3.0 APPLICATION
This guide supersedes information provided in the 2006 GGHA Conservation Authorities ESC Guide for
Urban Construction. While its intended application is for the control of erosion and sediment release from
urban construction projects in Ontario, many of the best practices described herein can be applicable to
other types of projects where ESC is required.
Who should use and become familiar with this document?
• Any ESC practitioners, including consulting engineers involved in ESC planning, contractors and
inspectors / environmental monitors
• Regulatory agency personnel involved in the review of ESC plans or those who issue other
construction related authorizations / approvals. This includes representatives from relevant federal
and provincial ministries, municipalities and conservation authorities.
Individuals /groups who develop land or manage the development of land on behalf of landowners
• Manufacturers, suppliers and distributors of ESC products
• Other interested parties, including environmental conservation groups and academics
Toronto and Region Conservation Authority Page 3
Erosion and Sediment Control Guide for Urban Construction
4.0 THE BASICS: EROSION, SEDIMENT TRANSPORT AND
SEDIMENTATION
4.1 Understanding erosion
Erosion is the process by which a material becomes dislodged and worn away due to the force of an
erosive agent. Land erosion is often caused by mobile agents such as water (e.g. stormwater) and wind.
Natural erosion rates are accelerated by land use activities that leave soils exposed, like agriculture and
land development. As erosion is accelerated, soil particles — often referred to as sediment - are
suspended and carried away by rain water, flowing into receiving water bodies like streams and wetlands.
TYPES OF EROSION
Splash erosion is caused by the impact of raindrops on
the land surface. This is the first step towards more
extensive erosion as it impacts the surface soil structure
and leads to reduced infiltration and increased surface
runoff.
Sheet erosion occurs when the soil erodes in a thin,
uniform sheet or layer. Water moves in broad sheets
over the soil surface rather than concentrating in small
depressions, as it does during rill erosion.
Rill erosion occurs when water running over the soil surface concentrates in small depressions and
erodes the soil to form small channels (< 30 cm deep) known as rills.
Gully erosion is a more advanced and extensive form of erosion. It occurs when rill erosion progresses,
causing the rills to increase in size (> 30 cm deep) and become gullies.
Gravitational erosion refers to the mass movement of soil downslope due to the force of gravity. Steep
and/or unstable slopes are the most susceptible, particularly when saturated with rainfall. It may be a
slow process, often referred to as creep, or occur quickly as in the case of mudslides and avalanches.
Channel erosion occurs when the banks and/or bed of an existing natural or constructed channel is
eroded by water flowing within it. While channel erosion is a natural process, it may be accelerated
during land development due to increased flow rates, alterations to flow regimes, and scour from
increased sediment loads.
lend erosion occurs when wind carries soil particles away from the land surface. This results in air
pollution as well as the transport and deposition of sediment into other unintended areas.
Toronto and Region Conservation Authority Page 4
Erosion and Sediment Control Guide for Urban Construction
Figure 4.7: Rill (left) and gully (centre and right) erosion on construction sites.
The potential for soil erosion is influenced by several factors, including:
• Rainfall characteristics I Droplet size, intensity, frequency, duration
• Climate I Soil temperatures, types of native vegetation, time of year
• Soil erodibility I Soil texture, structure, permeability, organic matter content
• Topography I Slope length and steepness
• Ground cover I Type and quality/areal density of cover
4.2 Understanding suspended sediment and sedimentation
rI
Eroded soil particles — often referred to as sediments - are suspended and carried away by rain water
until they have an opportunity to settle out, which occurs when the energy in the flowing water dissipates.
While larger, heavier suspended sediment particles can settle out readily when the water slows, the finer,
lighter particles can remain suspended for much longer. These fine particles may only settle after a
significant detention period or with the aid of sediment controls (discussed in the next section).
The process by which suspended sediment settles out and becomes deposited on a surface is referred to
as sedimentation. Sedimentation that occurs in undesirable locations, such as watercourses and
wetlands, is one of the primary risks associated with construction projects. Sedimentation can also occur
in intended areas, like within sediment control measures (e.g. detention ponds, sediment filter bags)
within the construction site.
Toronto and Region Conservation Authority Page 5
Erosion and Sediment Control Guide for Urban Construction
Figure 4.2: Unintended sediment deposition in natural areas.
4.3 The impacts of construction activities
When land is developed, existing vegetation is removed, topsoil is stripped, and natural drainage patterns
are altered to facilitate the earth moving and grading activities necessary to construct buildings and
infrastructure like roads and sewers. On many construction projects, which can be years long, most of
these stripped areas remain bare until final site stabilization, which often only occurs near the end of the
project.
Without the stabilizing effect of vegetation, erosion rates are accelerated, resulting in sediment laden
stormwater runoff flowing into natural features like woodlots, streams and wetlands. Monitoring in the
Greater Toronto Area shows that total suspended solid (TSS) concentrations in untreated runoff from
construction sites can be up to 30 times greater than that of stabilized residential areas (SWAMP, 2005;
TRCA and U of G, 2006; TRCA 2006). One study conducted at a construction site draining to Millers
Creek in Ajax revealed that, based on in -stream monitoring of TSS concentrations during 9 rainfall
events, the average event mean TSS concentration downstream of the construction site was 5 times
higher than upstream. For events monitored, the downstream sediment concentrations ranged from 53 to
2290 mg/L. The observed increase in stream TSS levels from upstream to downstream occurred even
though runoff volumes from the construction site comprised less than 25% of total stream flow and the
planned erosion and sediment controls had been implemented on the site (Greenland International and
TRCA, 2001).
Natural / pre -development
Uncontrolled construction site
Erosion control only
Erosion and sediment control
Urbanized / post -development
5 500 1600 1500 2000 2500 3000 3500 4000 451
mg/L
Figure 4.3: Stormwater sediment concentrations. Modified from: California Regional Water Quality
Control Board Erosion and Sediment Control Field Manual (1999).
Toronto and Region Conservation Authority Page 6
Erosion and Sediment Control Guide for Urban Construction
Sediment laden water may be released from a construction site through an intended discharge location
(e.g. sediment control pond outfall) when controls on the site are insufficient, or it can sometimes occur
elsewhere along the site perimeter where there is a failure of the controls in place (e.g. slope failure,
breach of silt fencing). Inadequate vehicle tracking controls can also result in sediment transport offsite
and deposition onto public roads. When this sediment is released to a natural water body like a stream,
lake or wetland, it will increase the turbidity of the water and/or settle out of suspension and become
deposited on the bed. Both outcomes can harm aquatic ecosystems, as many studies have documented
(e.g. Waters, 1995; Newcombe and MacDonald, 1991; Robertson at al., 2006).
In addition to accelerated erosion rates and elevated suspended sediment levels in runoff, grading and
earth moving activities cause changes to the local water balance, resulting in altered hydrological regimes
for the water features to which the site drains. The regime may be altered in a variety of ways, including:
(i) runoff volumes discharged to water features may increase or decrease, (ii) flow velocities may change,
and (iii) the timing and duration of inflows may shift.
These construction impacts - soil erosion, increased sediment transport offsite, and altered receiving
water hydrological regimes - can have significant negative effects on the surrounding environment as well
as the success and profitability of the project itself. Consequences to the project may include:
• Unanticipated expenditures related to restoration of impacted natural features and/or clean up of
sediment deposited on offsite infrastructure (e.g. roads, catchbasins, sewers);
• Delays related to the additional repair/restoration work as well as stop work orders that may be issued
by regulatory bodies;
• Local community groups vocalizing concerns over wind blown dust from site and muddy infrastructure;
• Legal repercussions associated with violation of permits/approvals, including fines and delays to
project progress; and
• Tarnished reputations for proponents or other project team members responsible for violations of
permits/approvals that result in environmental impacts.
A summary of legislation relevant to ESC and the overall mitigation of construction sediment releases is
provided in Appendix D. The potential environmental impacts associated with failing to provide and
maintain appropriate ESC measures during construction are described in the following subsections.
4.3.1 Impacts to aquatic community health
Suspended sediment
When sediment levels are elevated above naturally occurring levels in a receiving water system, there are
several direct and indirect effects to the fish, invertebrates and aquatic plants inhabiting the area. High
levels of suspended sediment result can result in:
• clogging and damage of the gill apparatus
• behavioral changes (e.g. movement, migration, defense of territories, dominance hierarchies)
• higher vulnerability to toxins, infection and disease, and
• reduced feeding (Singleton, 1985).
Toronto and Region Conservation Authority Page 7
Erosion and Sediment Control Guide for Urban Construction
As suspended sediment concentrations are elevated above natural levels, fish growth is impaired in
several ways. For example, reduced visibility makes it harder for fish to find and secure food. Sigler et al.
(1984) observed that the feeding behavior of Oncorhynchus mykiss (steelhead trout) and Oncorhynchus
kisutch (coho salmon) was affected, and growth significantly impaired, during laboratory simulation of
elevated turbidity levels using clays, kaolinite and bentonite. Fish were also observed to engage in
avoidance behavior during this study, migrating away from experimental channels where turbidity was
elevated.
With respect to aquatic invertebrate communities, suspended sediments can cause impairments by
scouring streambeds, dislodging organisms, abrading respiratory surfaces, and compromising feeding in
filter -feeding invertebrates (Singleton, 1985). In a review of research on the effects of suspended
sediment on aquatic organisms, Newcombe and MacDonald (1991) concluded that invertebrates are at
least as sensitive to elevated suspended sediment levels as salmonid fishes.
When total suspended solids (TSS) concentrations are increased above the natural regime, aquatic
plants are also impacted, creating a domino effect and altering community composition in the ecosystem.
Suspended sediment particles can reduce the amount of sunlight that reaches aquatic plants, thereby
inhibiting photosynthesis. More direct physical effects are also possible, like scouring of periphyton.
Deposited sediment
An increase in the deposition of sediment in natural water features, often associated with upstream land
use changes, can impact the health of aquatic organisms in several ways, including:
• coating of fish eggs;
• alteration of substrate;
• smothering of invertebrates; and
• burial of aquatic vegetation.
When sediment settles out onto the substrate of a
natural water body, it can compromise habitat by
reducing substrate composition and permeability. As
interstitial voids in the substrate are filled with fine
sediment, fish may use avoidance behaviours and
leave their spawning beds. Further, because the
survival of fish eggs depends on adequate oxygen
availability and the removal of waste, the substrate
must allow unimpeded flow of oxygenated water to
the eggs — a process which is compromised when
sediment deposits on the substrate and/or the eggs
themselves. Fish eggs are particularly susceptible
since they cannot swim to avoid sediment laden
Figure 4.4: Stream bed substrate
areas (Anderson et al. 1996). The survival of young fish that do hatch can also be compromised as
deposited sediment reduces intragravel dissolved oxygen levels (Shumway and Warren 1964; McNeil
1966; Garside 1959; Silver at al. 1963).
Due to their small size and bottom dwelling nature, benthic macroinvertebrates are vulnerable to harm by
smothering when sediment settles onto substrates. Deposition also compromises their microhabitat, and
because they are relatively immobile relative to fish, they are less likely to migrate to avoid unfavourable
Toronto and Region Conservation Authority Page 8
Erosion and Sediment Control Guide for Urban Construction
conditions. Periphyton are similarly at risk of experiencing smothering and loss of habitat (e.g. stable
substrates for attachment) from increased loads of deposited sediment (Nutall, 1972).
The settling of sediment in natural water features can also result in aquatic plant loss due to burial. As
tolerance of sediment accumulation can vary among plant species, ongoing sediment deposition can over
time lead to shifts in the pre-existing species composition (Terrados et al., 1998), which can have ripple
effects on other organisms by causing changes in trophic interactions.
4.3.2 Water quality degradation
Elevated TSS also adversely affects water quality, as nutrients and metal compounds are bound to
sediment particles being eroded into receiving water bodies. Increased nutrient loads to receiving water
systems can result in eutrophication, excess algal growth and ultimately depleted oxygen levels. Some
types of algae are also a human health concern (e.g. blue-green algae), as they cause the release of
toxins that lead to restrictions on swimming and the consumption of fish. In drinking water treatment,
excess algae and bacteria are one of the primary causes of odor and taste problems. Addressing water
quality issues associated with elevated levels of sediment and associated contaminants increases the
water treatment costs borne by municipalities.
4.3.3 Alterations to hydrological regime and geomorphology
Changes to the landscape associated with construction practices frequently results in increased runoff
volumes and peak flow rates. These increases can result in significant alteration to the form and function
of receiving water systems (Figure 4.5). Increases in flow rate and duration result in greater potential for
stream erosion, which alters channel morphology, destabilizes banks, and increases the risk to public and
private property due to flooding and flood damages. Sediment deposited in receiving water bodies can
also create a sediment imbalance, resulting in altered flow patterns and conveyance capacities, which
can impact the conveyance of flood flows and compromise recreational use and navigability.
Figure 4.5: Stream bank erosion.
Toronto and Region Conservation Authority Page 9
Erosion and Sediment Control Guide for Urban Construction
4.4 What is Erosion and Sediment Control?
Erosion control practices prevent exposed soils from being entrained by a mobile agent such as
stormwater or wind, while sediment controls address the removal of sediment suspended in
stormwater. Practices that reduce erosion rates include strategies to minimize the amount of land
cleared, diversion of flows around high erosion risk areas, and the application of ground covers that
stabilize soil and/or provide a physical barrier to soil particle detachment.
While erosion control is preventive in nature, as it is focused on keeping soil in place, sediment control
measures are reactive in nature and meant to remove sediment that has already become suspended in
stormwater. A multi -barrier approach to erosion and sediment control requires the application of both
types of controls in series, to create a resilient system capable of protecting the natural environment from
sediment impacts. This approach is defined in Chapter 7.0.
Figure 4.6: Erosion control blanket (left) and filter socks applied as sediment control check dams (right).
Sediment removal can be achieved in a variety of ways, but controls are generally focused on settling,
filtration, or a combination of the two. Settling controls promote gravitational settling of suspended
sediment by detaining stormwater and reducing flow velocities. They may be applied to treat
concentrated flows (e.g. check dams) or sheet flows (e.g. sediment fence) and are often applied in
conveyance systems (e.g. interceptor swales), at the site perimeter, or anywhere it is necessary to
separate a significant sediment source from a protected receiver. Filtration controls are porous materials
(e.g. geotextile fabric used for sediment bags) which hold back sediment from stormwater that passes
through them, with the filter's apparent opening size dictating the size of particles it can filter out.
Because filtration controls also reduce flow velocities, they can serve as settling controls as well. Table
4.1 provides a list of common erosion and sediment control best management practices (BMPs). Detailed
guidance on the application of each of these BMPs is provided in Appendix B.
In -water isolation measures, also listed in Table 4.1, are often listed as a third category of practices that
control the migration of sediment. This umbrella term encompasses structural sediment barriers — like
turbidity curtains — but also includes broader isolation techniques like watercourse diversions and bypass
pumping. Practices in this category are employed to achieve the following objectives:
Toronto and Region Conservation Authority Page 10
Erosion and Sediment Control Guide for Urban Construction
(i) Isolate in -water or near water construction areas so that sediment generated in the work area
is not released directly into the water flowing in the natural feature.
(ii) Minimize disruption and ecological risk to the natural feature.
(iii) Treat sediment laden water in a location away from the work area — using sediment control
strategies like settling and filtration - to render the water suitable for release into the feature.
Table 4.1 Erosion controls, sediment controls, and in -stream
Minimized or phased land
clearing
Vegetated filter strips
Slope drains
Interceptor swales
Outlet protection
Mulching
Seeding
Surface roughening
Rolled erosion control products
Chemical soil stabilization (e.g.
tackifiers)
Sediment control fence
Filter socks
Natural fibre logs and wattles
Rock check dams
Vehicle tracking controls
Sediment (dewatering) bags
Storm drain inlet protection
Sediment traps
Sediment control ponds
Weir tanks
Polymer flocculants
Active treatment systems
Horizontal Directional Drilling
Sediment / Turbidity Curtains
Temporary Stream Crossings via Temporary
bridge or Culvert(s)
Waterproof isolation barriers (e.g. cofferdams)
Diversion / bypass channel
Flume bypass
Bypass pumping
Dewatering
Practicing effective ESC on construction sites is a process that goes beyond the physical controls
themselves and starts even before topsoil stripping begins. The following are the key activities required
to practice effective ESC from project start to finish:
• Preliminary site data collection (to document baseline conditions) and erosion risk assessment
• ESC plan design
• Installation of ESC measures on site
• Routine inspection of ESC measures, documentation of inspections, and prompt response to problems
identified
• ESC performance monitoring (e.g. turbidity measurement)
• Re-evaluation, maintenance and replacement of ESC measures as needed
• Permanent site stabilization and decommissioning of ESC measures.
Guidance on each of these elements of ESC are discussed in the chapters that follow.
Toronto and Region Conservation Authority Page 11
Erosion and Sediment Control Guide for Urban Construction
5.0 PARTICIPANT ROLES AND RESPONSIBILITIES
Practicing effective erosion and sediment control over the course of a construction project requires that all
parties involved understand their roles and are equipped with the knowledge and resources they need to
fulfill their responsibilities. Table 5.1 lists the key parties involved in ESC on construction sites and the
typical distribution of roles and responsibilities among them. While the land owner ultimately holds
responsibility for ensuring that the project remains in compliance with all applicable legislation, the parties
involved all carry liability for their individual responsibilities for the following reasons:
• They have been retained and compensated for carrying out these activities on behalf of the land owner
/ developer; and
• They often hold a professional accreditation, certification or affiliation that compels them to practice in
accordance with the code of conduct / ethics defined by the governing body.
Many of these professional associations have codes of professional ethics that are relevant to
environmental protection. Examples of organizations that offer certification or accreditation of the types of
professionals who practice ESC include:
• Professional Engineers of Ontario (PEO)
• Ontario Association of Certified Engineering Technicians and Technologists (OACETT)
• Association of Professional Geoscientists of Ontario (APGO)
• Canadian Certified Inspector of Sediment and Erosion Control (CAN-CISEC)
• EnviroCert International (which administers the Certified Professional in Erosion and Sediment Control
— CPESC — certification program)
Liability and due diligence
Legal liability, as it relates to environmental protection, is
directly tied to applicable legislation and associated
permits, approvals and authorizations. More information
on the legislative framework for ESC is provided in
Appendix D. The extent to which an individual or
company is in compliance with a given piece of
legislation or the conditions of a permit / approval /
authorization is typically assessed by considering
whether they exercised due diligence in undertaking the
activities in question. The demonstration of due diligence
can mitigate both regulatory and civil liability in the event
of a construction site incident that results in adverse
impacts to aquatic and terrestrial communities, natural
features or other private property.
Due diligence means that every reasonable effort was made to remain in compliance with applicable
legislation and the terms and conditions associated with any permits, approvals or authorizations issued
for the project. One of the key questions that determines whether due diligence was exercised is the
question of whether an incident (e.g. sediment release offsite) was foreseeable and preventable. Even if
the incident is determined to have been unforeseeable or unpreventable, due diligence requires that
corrective actions are undertaken in a timely manner to ensure that harm to aquatic and terrestrial
Toronto and Region Conservation Authority Page 12
Erosion and Sediment Control Guide for Urban Construction
communities or natural features is prevented. One of the key ways of exercising due diligence is by
taking a proactive approach, in which potential erosion or sediment migration problems are identified
before they result in non-compliance.
Key actions that demonstrate due diligence with respect to ESC on construction sites include, but are not
limited to, the following:
• Train all construction staff to improve their understanding of ESC best management practices.
• Maintain ongoing communication among project team members, including regular construction
meetings with mandatory attendance requirements for key parties.
• Conduct erosion risk assessment and apply outcomes to help inform the selection and placement of
ESC measures as part of the ESC design process.
• Document — through inspection reporting, field notes and date stamped photos — any ESC issues and
the steps taken to resolve them. See inspections guidance in Chapter 10.0 for more information.
• Monitor the quality of construction site discharges and/or downstream receiving water systems, as
detailed in Chapter 10.0.
• Apply established best practices specified in local guidelines and policies.
• Apply a multi -barrier or treatment train approach to ESC as much as possible, as described Figure 7.1.
• Ensure all permits, approvals and/or authorizations required are secured prior to the commencement
of the regulated activities.
• Develop spills response and contingency plans prior to the start of construction.
• Retain specialized professionals as needed to address ongoing problems (e.g. ecologists, fluvial
geomorphologists, hydrogeologists, environmental monitoring experts).
• Demonstrate that every reasonable effort was made to prevent impacts.
• Ensure tools and replacement materials needed to repair and maintain ESCs are readily available or
able to be delivered on short notice.
• Modify ESC plan with contractor during construction to adapt to site conditions, and ensure changes
are documented and distributed to all relevant parties.
• Retain a qualified ESC inspector and ensure they complete inspections at the recommended
frequency, as described in Chapter 10.0.
Roles of key parties
The establishment of roles, responsibilities, communication protocols and reporting structures should
occur prior to the start of construction so that all parties clearly understand expectations. The strength of
an erosion and sediment control plan often lies with a thorough understanding of the undertaking. This
comprehension is normally found in the contract administrator, who forms the core of the construction
team. Traditionally the owner's representative on the project, the contract administrator liaises with all
parties including the contractor, ESC inspector and regulatory agencies. Professionals involved in
construction projects generally report directly to the land owner / developer or they are hired by the
contractor (e.g. landscaping companies). Notably, the team size expands and contracts in response to
project progress where specialized expertise is needed. Effective construction teams recognize when
Toronto and Region Conservation Authority Page 13
Erosion and Sediment Control Guide for Urban Construction
there is a need for additional expertise and rapidly engage those services to allow adequate time for
consultation among project team members and ensure the project proceeds on schedule. Examples of
specialized experts often retained on construction projects include monitoring specialists, fluvial
geomorphologists, aquatic biologists and hydrogeologists.
It should be noted that the defined roles summarized in Table 5.1 will often vary from project to project,
and in many cases one company will be hired by the land owner to handle multiple roles. These details
should not affect the success of the project provided that adequate staff are assigned to work on the
project and that they possess the experience and qualifications needed to carry out their assigned
responsibilities.
Figure 5.1: Professionals involved in construction projects
The ESC inspector has a particularly important role that can have significant impact on the success of
ESC measures and overall compliance efforts. The role of ESC inspector is to conduct unbiased
inspections of construction site activities, document findings, and report identified deficiencies to the
relevant project team members. It should be kept distinct from other roles to ensure they are able to carry
out their designated responsibilities. For example, the ESC inspector should not be responsible for
handling other types of construction site inspections, carrying out construction work, or maintaining ESC
measures.
Within Ontario, regulatory agencies commonly involved in ESC plan review are municipalities and
conservation authorities. Chapter 9.0 details the approval process for ESC and provides more
information on specific agencies involved based on site and project circumstances. For more information
on the role of the ESC inspector, refer to Chapter 10 which covers inspections, monitoring and
maintenance.
Toronto and Region Conservation Authority Page 14
Erosion and Sediment Control Guide for Urban Construction
Table 5.1: Roles and responsibilities of key parties involved in construction site erosion and sediment control
Land owner / Company or . Holds ultimate responsibility for ensuring that ESC is implemented so that the project does not adversely affect
developer
individual who
natural features and other adjacent lands.
or
owns the land
being developed,
Delegates responsibility to hired professionals (engineers, contractors, ecologists, inspectors) who design,
builder (once
or is working to
install, inspect, monitor, maintain and decommission ESC measures.
building
develop the land
. Ensures agreement with contractor on protocol for payment/reimbursement related to ESC maintenance, such
construction
on behalf of the
that ESCs can be kept in working order throughout the project.
phase has
begun)
land owner(s).
9 Holds liability in the event of ESC failure or regulatory violation.
site conditions.
. Remains engaged throughout construction to ensure effectiveness of ESC planning and implementation.
. While the division of responsibilities and liabilities may vary from project to project, a builder will typically, upon
transfer of ownership, become responsible for activities occurring on their lots.
Project
Assists ESC plan
. Oversees collection and analysis of pre -construction site data, as detailed in Section 6.1.
manager /
design
designer in
planning ESC as
' Conducts erosion risk assessment based on site data collected (see Section 6.2).
manager /
it relates to
• Provides information to support ESC plan design, e.g. site details, erosion risk and scheduling considerations.
design
construction
. Reviews and stamps ESC drawings and report.
engineer
phases,
schedules and
• Determines permits/approvals required and applies for them on behalf of land owner / developer.
site conditions.
. Maintains awareness of consequences regarding ESC failures from a regulatory perspective and remains in
regular contact with land owner / developer.
. Remains aware of contingency plans and directs use when necessary.
Toronto and Region Conservation Authority Page 15
Erosion and Sediment Control Guide for Urban Construction
ESC plan Develops (or
• Specifies ESC measures, their sizing, and placement on site based on site conditions and erosion risk.
designer leads the
. Designs ESC plans for each stage of construction (see Section 7.2), and includes instructions related to
development of)
decommissioning of ESC measures.
ESC plans for all
. Serves as the primary liaison between the project manager, plan designer, ESC inspector, and contractor(s).
stages of
• Ensures ESC plans are designed in accordance with established policies and best practices guidance.
construction
. Ensures ESC plans, if implemented as designed, will prevent exceedance of turbidity targets (see Section
10.2.2).
. Conducts site visits before designing the plan and during its implementation.
. Designs ESC plans that are practical and implementable based on consultation with the contractor.
. Revises ESC plans as needed if regulatory agency review reveals that modifications are required.
. Reviews and approves of on-site ESC design modifications, communicates changes to appropriate approval
agencies where required, and updates plans accordingly.
. Develops contingency plans for certain stages or activities as needed (e.g. dewatering activities).
. Directs implementation of the contingency plan if needed.
Contract Forms the core of
. Provides construction specifics and schedules to the rest of the construction team.
administrator the construction
team and reports
0 Ensures the necessary permits and approvals have been obtained and keeps copies of approved ESC plans,
directly the
to
permits and inspection reports in a central location on site.
land
. Serves as the primary liaison between the project manager, plan designer, ESC inspector, and contractor(s).
owner/developer
. Liaises with all parties including land owner, design engineers, contractors and regulatory agencies.
. Makes recommendations for the requirement of specialists.
. Receives ESC inspection reports from inspector and communicates necessary actions to construction staff.
. Aid in spills response and reporting as defined in Section 7.7.
Toronto and Region Conservation Authority Page 16
Erosion and Sediment Control Guide for Urban Construction
ESC Carries out ESC
.
Understands the ESC plan, spills response and contingency plans, and construction methods.
Inspector inspections,
reporting directly
Familiarizes him or herself with the landscape, drainage patterns and natural features prior to the start of
to land owner /
•
construction, taking notes and pictures to document pre -construction conditions.
developer and
.
Conducts an initial site inspection to evaluate whether ESC measures are installed as per the approved plan.
approval
.
Recognizes effective application of ESCs and communicates recommendations with the contractor.
agencies
ongoing issues with the effectiveness of ESC measures, and suggests ESC design modifications if needed.
.
Inspects all ESC measures every seven days at a minimum, before and after significant rainfall and snowmelt
.
events, and at other times as detailed in Section 10. 1.2 which provides guidance on inspection frequency.
Note: Inspector
.
Completes ESC inspection reports and circulates them to the contract administrator, contractor and (depending
qualifications are
detailed in
on project requirements) regulatory agencies like municipalities, CAs, and any other permitting agencies.
Section 10.1.1.
•
Establishes a protocol for communication with on- and off-site contacts and inspection report circulation.
pollution related to
.
Monitors site effluent and/or receiving water system based on project -specific requirements (see Section 10.2).
construction
.
Understand the permits and approvals that have been secured for the project and any associated conditions.
Contractor Undertakes
.
Signs off on ESC plan to ensure it is practical and implementable on the site.
construction and
the
Installs/constructs ESC measures based on approved ESC plans and according to plan specifications.
implementation
•
Provides input on construction -related aspects of ESC plan implementation including labour, equipment and
and maintenance
materials requirements, construction procedures and field constraints.
of ESC measures.
Informs ESC inspector, contract administrator and in some cases the ESC plan designer about any failures or
ongoing issues with the effectiveness of ESC measures, and suggests ESC design modifications if needed.
.
Reads all ESC inspection reports and takes corrective actions recommended within the specified timeframes.
.
Ensures ESC measures remain functional and are maintained / repaired as needed.
Regulatory Protect human
.
Responsibilities vary according to the agency but involve plan review, permitting and enforcement
agencies and environmental
responsibilities per their regulatory mandate and/or agreements with their partner agencies
health from water,
air and noise
0
Establish best practices and disseminate through guidelines, training programs and other forms of advocacy.
pollution related to
•
Communicate instructions on the development review process and submission requirements in a clear manner.
construction
.
Review ESC plans to ensure compliance with legislation and policies.
activities through
development
0
Issue permits / approvals / authorizations as needed to permit development activities that are otherwise
review, issuance
restricted or limited by federal, provincial or municipal legislation.
of permits /
•
Conduct site visits to assess effectiveness of ESCs and ensure compliance with conditions of
approvals, and
permits/approvals.
enforcement.
Toronto and Region Conservation Authority Page 17
Erosion and Sediment Control Guide for Urban Construction
6.0 ASSESSING EXISTING CONDITIONS AND EROSION RISK
The following subsections provide guidance on methods for assessing erosion risk on construction
projects, how to determine when erosion risk assessment is most needed, and how the outcomes of the
assessment should inform the development of ESC plans.
6.1 Collecting and analyzing site information
Development of an effective ESC plan requires an understanding of existing site conditions. In order to
evaluate the varying levels of erosion risk, a site assessment should be carried out to collect the following
information:
• Soil types and associated erodibilities for soils at the relevant grading level
• Topography
• Natural heritage features adjacent to the site and/or to which the site drains
• Local climate conditions
• Potential vegetation preservation areas, including buffer strips
• Surrounding infrastructure, such as public streets and buildings
• Areas where stormwater flows onto and off the site
Photographs, mapping and data collected should be applied to aid in the development of the ESC report
and drawings required for submission as defined in Chapter 8.0.
6.2 Erosion risk assessment (ERA)
Understanding a site's erosion risk and specifically identifying potential problem areas is essential to
developing an effective ESC plan. Once existing conditions data has been collected it can be used to
determine the site's natural erosion susceptibility as determined by soil characteristics, rainfall and climate
conditions, and topography. The primary purpose of an erosion risk assessment (ERA) is to clearly define
the level of risk and the probability of erosion and sedimentation occurring above natural or pre -
development levels as a result of construction activities within a given study area.
6.2.1 When to do an ERA
The ERA should be completed prior to preparing an ESC plan for the site. This is an important way that
the ESC plan designer can demonstrate due diligence and show that the selection and placement of
BMPs are directly tied to mitigating erosion, particularly in areas that have been identified as susceptible
through the assessment. The ESC plan should follow logically from the risk assessment, such that
enhanced controls and/or treatment trains (multiple controls installed in series, as defined in Chapter 7.0)
are placed in the most erosion susceptible areas.
The ERA should be completed based on the planned condition of the site (i.e. grades and land cover)
during construction stage 1 (topsoil stripping and grading), and should exclude any planned sediment
control measures. The risk classifications of different parts of the site — as established through the ERA —
should then inform which BMPs are selected and where they are placed in the stage 1 ESC plan. The
erosion risk assessment can be repeated at each subsequent stage of construction (e.g. site servicing,
Toronto and Region Conservation Authority Page 18
Erosion and Sediment Control Guide for Urban Construction
building construction) in order to help inform the optimal selection and placement of ESC measures
based on changing site conditions. If these specific stages don't apply to a given project, then the risk
assessment should be repeated only when the site grading significantly changes and a second ESC plan
is needed. Essentially, the ERA should be carried out every time a new staged ESC plan is required to
be submitted for approval, with the outcomes helping to inform the best practices applied at each stage.
6.2.2 Sites for which an ERA should be completed
While erosion risk should be considered during ESC planning on any projects where land stripping and
grading is planned, a formal erosion risk assessment, as detailed in Section 6.2.3, is recommended on
construction projects that meet any of the following criteria:
• Extent of land disturbance is greater than 10 ha and duration is longer than 30 days
• Construction activities are planned in or near natural water features (e.g. within CA regulated area)
• The site drains to species at risk habitat (as defined in O.Reg. 230/08)
Unless otherwise required by the overseeing regulatory agencies, the "hybrid qualtitative ERA approach"
(section 6.2.3) should be method applied for ERA on these sites. A background discussion on other ERA
approaches — including the Revised Universal Soil Loss Equation (RUSLE) for Application in Canada and
the Ministry of Transportation's qualitative risk assessment approach — is provided in Appendix E.
6.2.3 Hybrid qualitative ERA approach
The approach detailed in this section represents a hybrid of the MTO approach and the RUSLE method
described in Appendix E. While qualitative like the MTO approach (described in the 2015 Environmental
Guide for Erosion and Sediment Control During Construction of Highway Projects), it differs in that it does
not consider risk classification of consequences and is instead focused solely on estimating erosion risk.
The hybrid approach involves the following steps:
1) Dividing the site into polygons of like erosion potential that are delineated by using topographical and
soils maps and aerial photographs. The base map used to select polygons should be developed at a
scale suitable to the size and topography of the study area. The scale should be sufficient to discern
areas with different erosion risk levels. Polygon sizes between 0.5 and 10 ha are recommended.
2) For each polygon, compile data on soil characteristics (K factor), topography (LS factor), and
anticipated ground cover, if any (C factor).
3) Using the risk classification tables provided below, rate each polygon as having a high, moderate, or
low risk of erosion.
4) Select best practices most appropriate for mitigating erosion based on the estimated risk. See BMP
selection guidance in table 6.6.
5) Prepare ESC plan, specifying best practices for each polygon based on what is determined through
the hybrid ERA approach.
6) Repeat this process for each construction stage with a distinct ESC plan, e.g. topsoil stripping &
grading, site servicing, building construction.
Toronto and Region Conservation Authority Page 19
Erosion and Sediment Control Guide for Urban Construction
Risk classification — soil erodibility (K factor)
The key characteristics that determine the erodibility of a soil are:
Particle Size and Soil Texture I Larger particle sizes (e.g. gravels with particles greater than 2 mm in
diameter) are typically less susceptible to erosion, as these particles require higher energies for
particle detachment and transport. Soils with high clay content also are less susceptible to erosion
due to their cohesive strength. Soil texture also affects the rate and volume of runoff.
Soil Permeability and Soil Structure I Generally defined as the extent to which a soil will permit
water to flow through it. Soils with higher permeability will result in reduced runoff and onsite ponding
following a storm or thaw event, therefore reducing the risk of erosion and sediment transport. Soil
structure is indicative of the extent to which soil particles are bound to one another, which affects its
erosion resistance. Where soils are compacted due to construction activities, permeability is reduced.
This can be mitigated on construction projects by scarifying or roughening the soil surface, as
described in Appendix B1.
• Organic Matter I Soils with high organic matter typically have a lower erosion susceptibility due to
their moisture retention capacity and good soil structure. On construction projects that require
extensive topsoil stripping, organic content in soils will typically be minimal.
Soil erodibility potential as it relates to soil texture is classified as shown in Table 6.2 below. It should be
noted that determination of soil type for consideration in the ERA should be based on the soil
present at the grading level of the works being conducted and not just the topsoil.
Table 6.2 — Erosion risk classification according to soil type
Low
Low
Low
Low
Low
Low
Low
Moderate
Moderate
Moderate
Moderate
High
High
High
High
Source: Adapted from Guidelines on Erosion and Sediment Control for Urban Construction Site (MNRF, 1987)
Toronto and Region Conservation Authority Page 20
Erosion and Sediment Control Guide for Urban Construction
Risk classification — topography (LS factor)
The length, slope gradient and drainage patterns associated with an area of disturbance is one of the
major contributors to erosion and sedimentation within a construction site. For the purpose of determining
erosion potential, slope gradients can be separated into three classes: gentle (< 2%), moderate (2 to
10%) and steep (>10%). Slope lengths are divided into two categories — less than 30 metres or greater
than 30 metres. Once the slope gradient, slope length and soil erodibility (as determined based on Table
6.2) are all known, the erosion risk classification can be determined as shown in Table 6.3. Because site
topography is ever -evolving on construction sites, the risk assessment should be repeated for each
distinct phase of construction, as described earlier in section 6.2.1.
Table 6.3: Erosion risk classification according to slope gradient, soil erodibility, and slope length
Low
Moderate
Moderate
Moderate
Moderate
High
Low
Moderate
Moderate
High
High
High
Low Moderate
High, High
High High i
Source: Adapted from Guidelines on Erosion and Sediment Control for Urban Construction Sites (MNRF, 1987)
Risk classification — ground cover (C factor)
The establishment of a soil cover on disturbed areas of a construction site can significantly reduce
erosion risk in the following ways:
• Canopy cover shields the ground from erosive forces associated with rainfall.
• Soil compaction is reduced and permeability is enhanced, thereby promoting greater water infiltration
and lower runoff volumes.
Established vegetation contains root mass that improves the structure of soils, reducing the potential
for soil detachment during larger, more intense storm events.
The highest risk of erosion due to the lack of sufficient vegetation coverage typically occurs immediately
following topsoil stripping and/or rough grading activities. Establishing a hardy and uniform ground cover
is one of the most effective methods of preventing erosion on an active construction site.
Toronto and Region Conservation Authority Page 21
Erosion and Sediment Control Guide for Urban Construction
The erosion risk classification for a variety of soil cover types are provided in Table 6.4. For construction
projects where extensive vegetation removal, topsoil stripping, and/or grading are required, the erosion
potential (based on soil cover) should be rated as high. If a defined polygon area contains more than one
type of ground cover, the different cover areas should be assessed as separate polygons, particularly if the
ground covers have very different erosion risk classifications (e.g. bare soil vs. established vegetation) and
they each represent a significant portion of the polygon. Alternatively if one cover type covers most of the
area, the risk classification for that cover could simply be applied for the whole polygon.
Table 6.4: Erosion risk classification according to soil cover type
Low
Low
Moderate to Low'
Moderate to Low'
I Depends on the quality of the cover (e.g. good ground preparation and coverage, even application, rolled erosion control products
properly secured in place). 3 Assumes planting and growth occurs during optimum growing conditions.
Source: RUSLE for Application in Canada: A Handbook for Estimating Soil Loss from Water Erosion in Canada (Wall at al., 2002)
Overall polygon erosion risk classification
Based on the risk classifications from Tables 6.3 (slope gradient, slope length and soil erodibility) and 6.4
(soil cover type), an overall risk classification can be determined for each polygon, as depicted in Table
6.5. The risk classification for the polygon should be used to make decisions about the best management
practices appropriate to mitigate erosion in that part of the site. The structural and non-structural best
management practices recommended for different erosion risk classifications are discussed in section
6.2.4 and summarized in Table 6.6.
Additional considerations — rainfall duration and intensity
While the value of the rainfall -runoff erosivity (R) factor does not vary within a site, since geographical
variations in R -factor are much broader in scale, it is still important to consider seasonal temperature and
rainfall variations and their impact on erosion potential. Highly erosive rains associated with higher
intensity storm events typically occur during the summer months (from June through September).
Construction during the late winter/early spring can also be subject to high runoff volumes and erosion
Toronto and Region Conservation Authority Page 22
Moderate
High
High
Most
High
I Depends on the quality of the cover (e.g. good ground preparation and coverage, even application, rolled erosion control products
properly secured in place). 3 Assumes planting and growth occurs during optimum growing conditions.
Source: RUSLE for Application in Canada: A Handbook for Estimating Soil Loss from Water Erosion in Canada (Wall at al., 2002)
Overall polygon erosion risk classification
Based on the risk classifications from Tables 6.3 (slope gradient, slope length and soil erodibility) and 6.4
(soil cover type), an overall risk classification can be determined for each polygon, as depicted in Table
6.5. The risk classification for the polygon should be used to make decisions about the best management
practices appropriate to mitigate erosion in that part of the site. The structural and non-structural best
management practices recommended for different erosion risk classifications are discussed in section
6.2.4 and summarized in Table 6.6.
Additional considerations — rainfall duration and intensity
While the value of the rainfall -runoff erosivity (R) factor does not vary within a site, since geographical
variations in R -factor are much broader in scale, it is still important to consider seasonal temperature and
rainfall variations and their impact on erosion potential. Highly erosive rains associated with higher
intensity storm events typically occur during the summer months (from June through September).
Construction during the late winter/early spring can also be subject to high runoff volumes and erosion
Toronto and Region Conservation Authority Page 22
Erosion and Sediment Control Guide for Urban Construction
risk due to the potential for snowmelt occurring on top of frozen soils. Further, areas disturbed over the
winter months are challenging to stabilize due to unfavourable growing conditions. As a result, these
areas may be highly susceptible to erosion once spring thaw occurs. When considering the polygon
erosion risk classifications in Table 6.5, it would be appropriate to consider designating the erosion risk at
the next level up for long duration projects that extend over multiple seasons.
Table 6.5: Overall erosion risk classification
6.2.4 Selecting BMPs based on erosion risk
Low
Low
Moderate
Moderate
Moderate
High
Moderate
High
ML High
The key objective of the ERA is to inform decisions on the types and locations of both structural (e.g.
double -row silt fence) and non-structural (turbidity monitoring) best management practices that should be
applied on the site. Table 6.6 lists recommended BMPs to be applied in each polygon based on its risk
classification. For sites where RUSLE calculations are used to estimate erosion, Table 1.1. from the
RUSLE FAC document should be referenced to determine if the calculated soil loss value is classified as
very low, low, moderate, high, or severe. In referencing Table 6.6, 'very low' and 'low' classifications
should be considered 'low' and 'high' or'severe' classifications should be considered 'high'.
The best management practices listed in Table 6.6 are described below for further clarification.
Procedural ESC measures I Procedural BMPs are nonstructural methods or procedures that can
reduce erosion and sediment transport, such as site management and scheduling practices. Procedural
BMPs include site management practices like minimizing exposed soils, careful control of site perimeter,
and planning of site access points and signage for sensitive areas. Scheduling practices include
examples such as working during dry seasons, abiding by fisheries timing windows and restoring the site
as quickly as possible. Procedural ESC measures should be applied on all construction projects.
ESC Plan I This includes drawings, standard notes and reports depicting and describing the site
conditions (e.g. grades, locations of natural features, soil stockpiles and other key points of interest)
during a particular phase of construction, and the structural best management practices that will be
applied to mitigate erosion and offsite sediment transport. ESC plans should be provided in stages
Toronto and Region Conservation Authority Page 23
Erosion and Sediment Control Guide for Urban Construction
reflecting the distinct phases of construction, which are normally categorized as: (i) topsoil stripping and
grading, (ii) site servicing, and (iii) building construction. Individual ESC Plans should be generated for
each stage of every construction project.
Table 6.6: Best management practices recommended at different erosion risk levels
yes yes yes
yes yes yes
yes yes yes
optional where possible yes
optional where possible yes
optional optional yes
optional Recommended after Continuous
significant rainfalllsnowmelt recommended
Source: Adapted from Environmental Guide for Erosion and Sediment Control During Construction of Highway
Projects (MTO, 2015).
'As described in section 6.2.4. 2See Chapter 10 for more information on turbidity monitoring requirements.
Routine inspection of ESC effectiveness I ESC inspections involve regular assessment of the
effectiveness of individual ESC measures and the overall ESC plan through site inspections and
monitoring. This allows for identification of areas where maintenance (e.g. sediment removal) and repairs
(e.g. replacement of damaged sediment fence) of ESC measures are needed, and also reveals when
ESC measures should be replaced or augmented due to repeated failures. Guidance on inspection and
monitoring is provided in chapter 10. Routine ESC inspections should be carried out on all construction
projects.
Flow/runoff diversion I For construction site areas susceptible to erosion, where stabilization is not
feasible, it may be advisable to divert runoff around bare soil areas with practices like interceptor swales
or slope drains. These practices are detailed in Appendix B1. Flow diversion should be considered on
any unstabilized area, but is particularly necessary where erosion risk has been classified as high due to
soil types or slopes.
Phased construction and progressive rehabilitation I Staging construction and land clearing is a
practice that requires strategic planning to schedule clearing and re -stabilization so that the total amount
of time that bare soils are left exposed is minimized as much as possible. Guidance on the
implementation of phased land clearing is provided in Appendix B1. Phased construction and
progressive rehabilitation should be considered on all construction projects, but is particularly necessary
where erosion risk has been classified as high due to soil types or slopes.
Toronto and Region Conservation Authority Page 24
Erosion and Sediment Control Guide for Urban Construction
More intensive ESC measures I This includes a range of practices that are considered more robust and
effective than the most commonly applied sediment controls. Examples include: double row silt fence
barriers (particularly adjacent to natural features), weir/settling tanks, active treatment systems (see
Appendix B2), and other runoff detention measures (e.g. sediment traps, ponds). On high erosion risk
sites, these types of measures can provide more assurance that sediment laden water will not leave the
site, since they provide more opportunity for the removal of suspended sediment in runoff. Intensive/
enhanced ESC measures should be considered on all construction projects, but are particularly
necessary where erosion risk has been classified as high due to soil types or slopes.
Turbidity monitoring I Beyond the routine inspection and repair of individual ESC measures, it is
important to evaluate the cumulative effectiveness of all the controls installed on a construction site by
monitoring the quality of site discharges or the quality of receiving water systems downstream of the site.
On construction sites, turbidity is an important and easily monitored parameter that gives an indication of
the amount of suspended sediment in site runoff. Guidance on selecting a turbidity monitoring approach
according to site conditions and project circumstances is provided in section 10.2.1. Turbidity monitoring
should be considered on all construction projects, with more intensive efforts applied on sites where
erosion risk has been classified as high due to soil types or slopes.
6.2.5 ERA submission components
Documentation of the ERA process carried out and associated results can be provided as part of the ESC
plan submission package described in Chapter 8.0. The following items should be provided to document
the ERA process and its outcomes:
1) A site map showing (labelled) polygons of like erosion potential. The map should be developed at a
scale suitable to the size and topography of the study area. The base map should be prepared from a
detailed topographic map or air photo mosaic.
2) A table listing the erosion risk classification of each polygon and brief justification of the classification.
3) A description, in tabular or text form, of the BMPs that will be applied in each polygon, including a brief
justification based on the risk classification. This may be combined with the polygon risk classification
table described in #2 above if appropriate.
4) An ESC plan for the stage in question which includes BMPs that have been selected and located so as
to best mitigate erosion in each polygon.
Toronto and Region Conservation Authority Page 25
The ESC planning process should be...
COMPREHENSIVE I All stages of the construction period and all relevant geographic areas
should be included in the plan. ESC measures selected should be robust and provide for
redundancy in case anyone measure fails. One important way to achieve this is to apply a multi -
barrier approach wherever possible.
COLLABORATIVE I The ESC designercreates a plan, using their technical expertise to
establish sizing, design and placement of ESC measures. To the extent possible, the contractor
should provide input on the suitability, practicality and constructability of the plans, taking into
consideration labour, equipment, materials, construction practices and site constraints.
Collaboration should continue throughoutthe construction, such that plans may evolve based on
changing conditions and inputfrom on site personnel like construction staff and inspectors.
STRATEGIC I During early planning, identify opportunities to phase developmentwhenever
possible. Phasing development requires strategic planning to schedule clearing and re -
stabilization so that the total amount of time that bare soils are left exposed is minimized as much
as possible. See Appendix 131 for guidance on phased stripping.
DYNAMIC I Approved ESC plans must be considered dynamic rather than static, with
measures upgraded andloramended asneeded tomitigate risk ofsediment release. Evenwhen
measures are implemented according to approved plans, adjustments must be made as
necessary when inspection identifies a risk of ESC failure and potential ecological impact.
Erosion and Sediment Control Guide for Urban Construction
Based on soil characteristics, rainfall and climate conditions, and topography, the erosion risk assessment
(Chapter 6.0) reveals the extent to which erosion and sedimentation are likely to occur at rates above
natural or pre -development levels.
Demonstrates due diligence on the part of the ESC plan designer.
e The ESC plan should follow logically from the risk assessment, such that enhanced controls and multiple
barrier strategies (i.e. treatment trains) are applied in areas where erosion risk is highest.
Focus on erosion prevention as a first priority by minimizing the areal extent and duration of land
disturbance, avoiding non-essential clearing and grading, and re -stabilizing as quickly as possible.
r Consider phasing development- dividing site into smaller parcels of more manageable size - with size
dictated by availability of labour and equipment, construction seasons, project timelines, and any restrictions
associated with permits and approvals (e.g. fisheries timing windows). See Appendix B for details.
Stabilize bare soil areas that are inactive for 30 days or longer.
Construction site source controls prevent erosion through structural (e.g. ground covers) or non-
structural (planning for phased development) means.
Creating stable flow conveyance pathways mitigates erosion, and sediment controls installed along the
pathways (e.g. check dams) remove suspended sediment in the stormwater.
. End -of -pipe controls (e.g. sediment control ponds, sediment traps) provide sediment removal, largely
through detention, and control of peak flows, which reduces stream erosion and flooding risk.
Reducing flow velocities and detaining stormwater reduces runoff erosivity and provides opportunity for
gravitational settling of suspended sediment.
Y Slow runoff using flow interrupters (e.g. check dams) and erosion controls (e.g. vegetation).
Detain water in practices like ponds, sediment traps and, on a smaller scale, through grading that allows for
on site detention and increased opportunity for evaporation and infiltration of stormwater.
Y Always consider flow interrupters in conveyance channels, stormwater outlets and along contours of slopes.
Divert runoff around unstabilized areas like bare soils and steep slopes to mitigate erosion.
Always consider whether a ground surface can withstand the erosive force of the runoff — whether it's
concentrated or sheet flow — that will be directed towards it. If erosion is anticipated, the area should be
better stabilized or flows must be diverted elsewhere.
Diversion measures — like slope drains and interceptor swales—allow runoff to be collected and conveyed
through a stabilized flow path, avoiding the formation of rills and gullies.
Long (> 30 m) and steep (> 10%) slopes are far more susceptible to erosion (see Table 6.3).
Wherever possible, grade site such that slope gradients and lengths are reduced.
In cases where alternative grading is not possible, use stabilization, flow diversion (e.g. slope drains) and/or
flow interruption to prevent the slope from eroding.
Avoid I
concentrated
flows
Concentrated stormwater flows are often more erosive and damaging than sheet flows.
Concentrated flows should only occur where they are planned — such as within interceptor swales or other
conveyance channels — and where the surface has been stabilized to withstand the anticipated flow rates.
Discharges from pumps and other outlets, which are often concentrated, should be dissipated or dispersed
to create more of a sheet flow (e.g. pump discharge into a geotextile sediment bag).
r The ESC is a living document that should be updated as needed to ensure sufficient protections are always in
place to mitigate risk of excess sediment release to natural features.
ESC plan revisions that are minor and carried out within the limits of development can be marked up on the
drawing and re -sent to regulatory agencies for their information.
For any significant changes to ESC strategy for the site, and changes that are planned in the natural area
outside the limits of development, the ESC plan must be formally revised and re -submitted for approval.
Figure 7.1: Principles of ESC planning
Toronto and Region Conservation Authority Page 27
Erosion and Sediment Control Guide for Urban Construction
Project Name
Project Location
ESC Plan Designer
Name, company,
phone number, e-mail
Land Owner
Name, company,
phone number, e-mail
Developer
Name, company,
phone number, a-,.
Inspector
Name, company.
phone number, r
Municioal contact
CA contact
Conduct a site walk to make field observations about existing conditions before developing the ESC Plan.
Collect existing site condition data (e.g., topographic survey, site photos, soils reports).
J Identify existing drainage patterns including internal and external flow routes. Identify areas with sheet flow,
concentrated flow and receiving watercourses.
J Identify all natural heritage features and conduct surveys to delineate boundaries where required (e.g., watercourses,
wetlands, woodlots, riparian zone, etc.).
J Establish baseline monitoring program if required.
J Carry out an erosion risk assessment (see Chapter 6.0).
J Protect all natural heritage features.
J Undertake construction in a way that minimizes soil disturbance and vegetation clearing.
J Aim to prevent erosion whenever possible.
J Suggest techniques that allow for sedimentation by slowing down the velocity of flowing water.
J Ensure that sediment is contained and managed onsite.
J Undertake earthworks in phases in order to minimize the amount of time that soils are left exposed.
J Manage internal drainage and convey or divert external drainage through or around the site.
J Coordinate and schedule any in -water or near water works with applicable fish windows and planting seasons.
J Select ESC measures appropriate to the season.
ESC
is a dynamic process and plan designs must reflect different stages of construction and their associated issues.
J Prepare ESC plans that address each construction stage. Multiple plans are required.
- Stage 1: Topsoil stripping, grading and re -stabilization
- Stage 2: Site servicing
- Stage 3: Building construction
J Select the types and locations of best management practices based on the outcome of the erosion risk assessment.
J Preserve existing vegetation and maintain vegetation buffer whenever possible
J Stabilize stockpiles and any other exposed soils on areas inactive for 30 days.
J Protect exposed soils, particularly on steep slopes
J Provide ESC practices to slow flow velocity and settle sediments
J Protect storm inlets and storm sewer system
J Conduct pre -construction meeting with the developer, contractor, environmental monitor and regulatory authorities to
confirm constructability and practicality of the design.
J Ensure that all standard ESC notes are included on the drawings.
J Prepare an ESC report to accompany the drawings.
J Inspection, monitoring and maintenance
J Revising ESC plan if needed due to changing site conditions or ineffectiveness of original measures.
Figure 7.2: ESC planning checklist
Toronto and Region Conservation Authority Page 28
Erosion and Sediment Control Guide for Urban Construction
7.2 Staged ESC Planning
The term 'staging' in relation to ESC plans refers to the technique of designing different plans for each
stage of construction. This approach involves identifying the distinct stages of construction during which
specific activities take place and then selecting the types and locations of ESC measures most
appropriate for each stage. The primary purpose of developing staged ESC plans is to ensure that
measures selected are the most effective and appropriate based on site conditions and construction
activities planned.
While construction sites are by their nature constantly evolving, it is possible to define distinct
construction stages largely based on the key activities that will be completed. The following are the
stages of construction for subdivision developments:
1. Topsoil stripping, grading and re -stabilization
2. Servicing
3. Building construction
4. Final stabilization/rehabilitation and ESC decommissioning
For in -water construction and linear infrastructure projects like highways, railways and pipelines, the
stages are slightly different but should still be defined based on distinct differences in the types of
activities underway. In general, most construction projects will involve the first and last stages - stripping
and grading and final stabilization/rehabilitation and decommissioning. The ESC designer should apply
their professional judgement to establish what other distinct stages should be planned for based on the
specific project. Regulatory agencies should be consulted to confirm that the defined stages are
appropriate to the construction activities planned, and that they will capture the changing environmental
conditions so that impacts can be mitigated at every stage. Additional information on erosion and
sediment control during in -water construction is provided in section 7.5 and Appendix C.
Staged ESC plans should be prepared to show specific ESC techniques, drainage patterns and
transitional site conditions at each stage. While there is no preset number of required ESC drawings,
major modifications to drainage patterns should be used as a trigger for a new staged ESC plan. The
following sections detail the typical conditions and key considerations during each construction stage.
Stage 1: Topsoil stripping, grading and re -stabilization
Figure 7.3: Construction site grading
During this stage, vegetation and topsoil are removed and
the soils are moved around the site (cut and fill) to achieve
the necessary pre -grade elevations. ESC measures like
sediment control ponds and perimeter and conveyance
controls are installed just before topsoil stripping begins to
ensure adequate protection is in place as soon as the soil
stabilizing effect of vegetation is removed. While this stage
of construction is typically subject to the most appropriate
application of ESC measures, there are several ways in
which common practices can be improved or enhanced.
Of particular importance is the prevention of erosion through phased development. Clearing of smaller,
more manageable sections of the site — leaving other areas undisturbed and vegetated for as long
Toronto and Region Conservation Authority Page 29
Erosion and Sediment Control Guide for Urban Construction
as possible — can be one of the most impactful strategies for mitigating sediment releases during
earthworks and grading. When phasing is applied, topsoil stripping and grading activities are limited
only to areas designated in that development phase. Phased clearing of lands during this stage should be
based on the size of the site, the season and construction timelines, the cut and fill plan, and any
requirements specified in permits and approvals. The grading plan and cut -fill analysis for the site must
be available prior to phase planning. Detailed guidance on minimizing and/or phasing stripping on
construction sites is provided in Appendix 131.
Stage 2: Site Servicing
During stage 2 the installation of underground services, like
storm sewers and water mains, and the construction of
roads results in a significant alteration to the internal
drainage patterns of the site. Pre -grading of building lots —
such that the lot grade is lower than the roads and the
sediment control ponds — can often result in localized
ponding areas. Despite this, catchbasin inlet protection is
still required, even after roads are paved, due to the large
amounts of sediment tracked onto the roads from the still
unstabilized lot areas. Inlet protection should be installed
as soon as catchbasins start receiving runoff.
Figure 7.4: Site servicing
Careful consideration should be given to additional ESC requirements and flow control measures due to
transitional grading during this stage. ESC measures applied in stage 1 should be re -assessed for
suitability based on altered flow patterns and changes to construction activities during this stage.
Toronto and Region Conservation Authority Page 30
Erosion and Sediment Control Guide for Urban Construction
STAGE 2 — KEY CONSIDERATIONS
> Redirect swales/ditches based on new grades and flow patterns
> Relocate ESC measures
> Stabilize inactive areas and steep slopes
> Install storm drain inlet protection (see Appendix 132) before storm drains start to receive runoff
> Provide for treatment of stormwater pumped out of excavated areas, and erosion
protection/flow dispersion at the discharge location. See details under 'Pumping and
dewatering' in this chapter.
l �
Stage 3: Building construction
Figure 7.5: Building construction stage
During stages 1 and 2, construction activities are mostly
undertaken by the main earthworks contractor. Once the site
is ready for building construction it is often turned over to the
builder, and there are often many new contractors and sub-
contractors who begin work on the site. While the
earthworks contractor may have established a good
communication protocol with project team members,
including the landowner, ESC designer and inspectors, this
may be lost once the additional building construction
contractors become involved. ESC plans must include
measures that will provide protection during the activities
specific to this stage of construction.
One of the most common risks encountered during stage 3 is the migration of sediment into rear lot and
road catchbasins. During Stage 2, catchbasins are elevated above the rough lot grades, and as such
localized ponding provides some opportunity for sediment settling. Once lots are at their final grades but
have not yet been stabilized, lot runoff runs directly into the catchbasins. Applying and maintaining
effective inlet protection (described in Appendix 62) is an important way to mitigate sediment migration
during building construction, before vegetative stabilization can be established on the lot.
Toronto and Region Conservation Authority Page 31
Erosion and Sediment Control Guide for Urban Construction
Stage 4: Final stabilization and decommissioning
During the final stage of construction, home building has
been completed and any remaining bare soil areas of the
site can be stabilized. At this stage ESC measures are
progressively removed as contributing drainage areas are
effectively stabilized. Depending on the type of
development, this may involve landscaping building lots and
common areas like boulevard islands, recreational or
parkland areas, and stormwater pond blocks.
The extent to which permanent vegetation is healthy and
providing good soil coverage should be verified prior to the
decommissioning of ESC measures. The stage 4 ESC
plan should include decommissioning details for all ESC
measures — including perimeter sediment control fencing —
and provide information on the proper removal and offsite disposal of materials. Details should also be
provided for restoration of areas from which in the ground ESCs have been removed (e.g. sediment
fence). Restoration guidance is provided in Appendix G.
Figure 7.6: Subdivision after final
stabilization
STAGE 4 — KEY CONSIDERATIONS
Remove all accumulated sediment remaining on the site, with particular attention to sediment
accumulated behind perimeter sediment controls, along roadways, and around catchbasin
inlets
For sites with low impact development (LID) measures that have been kept offline during
construction, specify that all sediment accumulated in areas draining to the LID must be
removed before it is put online. See section 7.6 for more detail on ESC for LIDS.
Stabilize and/or restore all disturbed areas of the site
"r Decommission temporary ESC measures as contributing drainage areas are effectively
stabilized.
Specify appropriate offsite disposal of ESC materials
Toronto and Region Conservation Authority Page 32
Erosion and Sediment Control Guide for Urban Construction
7.3 BMP selection
Selecting the appropriate BMPs for a particular ESC application requires a clear understanding of how
the BMPs function, their intended use, expected performance and what maintenance they will require.
ESC designers who are familiar with a wide range of structural and non-structural BMPs — and how they
are best applied — have more tools in their toolbox when it comes to addressing ESC challenges in
construction projects. BMPs can be categorized according to their intended function as detailed in the
following subsections. Detailed design, installation and maintenance guidance for all BMPs addressed in
this section is provided in Appendix B.
7.3.1 Erosion prevention
Practices that prevent erosion are the most effective BMPs because they address sediment at its source.
Erosion prevention measures include minimized or phased stripping and strategies that divert flows
around or away from erosion prone areas. Minimizing clearing involves the identification of site areas
where vegetation can be preserved throughout the entire construction period. Preserving vegetated areas
not only prevents erosion but also helps to manage runoff, as the topsoil, vegetation and root systems are
effective at intercepting and infiltrating stormwater. Minimized clearing can often be achieved on some
parcels of land designated for later development (e.g. school blocks), and is particularly important at the
site perimeter and around natural features. Guidance on appropriate buffers around natural features is
provided in Appendix 61.
Practices that are meant to prevent erosion by diverting and controlling runoff include structures like slope
drains and interceptor swales. Slope drains convey runoff down a slope without allowing it to flow across
the slope face. On long, steep and/or unstabilized slopes in particular, slope drains are an important way
to reduce the chance of rill and gully formation on the slope.
7.3.2 Erosion control
Erosion control measures are applied to bare or
under -stabilized soils in order to improve
resistance to erosion by water and wind. Key areas
of the site where erosion controls should be
applied include:
• areas inactive for 30 days or longer
• slopes
• soil stockpiles
• runoff conveyance channels (e.g. interceptor
swales)
• areas immediately downstream of water outlets
• banks of detention ponds and sediment traps
Figure 7.7: Soil stabilization with a rolled erosion
• lay down areas for sediment (dewatering) bags control product
• other areas where erosion risk is high and runoff flows directly towards a sensitive area downstream
(e.g. stream, wetland)
Toronto and Region Conservation Authority Page 33
Erosion and Sediment Control Guide for Urban Construction
One of the most common and effective erosion controls — when properly applied and allowed to take root
— is vegetative stabilization (i.e. seeding). An area may be seeded as a temporary/short term erosion
control strategy or as part of the final site stabilization/restoration plan.
Other ground covers often applied to control erosion are rolled erosion control products (RECPs, as
shown in Figure 7.7) like netting, blankets and matting. They serve as a physical barrier to erosive forces
and, when applied over a newly seeded area, provide protection and insulation that can improve seed
establishment. Detailed guidance on these and other erosion control measures, including mulching,
surface roughening and chemical stabilization, are provided in Appendix B1.
On sites where dust is a concern, wind erosion is often mitigated by misting / irritating bare soil areas
during dry weather periods. Due to the temporary nature of this control measure, application of more
lasting stabilization techniques, such as the methods detailed in Appendix 61, should be pursued if wind-
blown dust is anticipated to be an ongoing problem.
7.3.3 Stormwater detention
On construction sites, detention can be an effective mechanism for removing suspended sediment from
stormwater before it can be released to the receiving system, as well as helping to reduce peak flow
rates. End -of -pipe BMPs on construction sites - like detention ponds, sediment traps and settling (weir)
tanks — provide extended detention of construction runoff on a large scale. Within the detention area, the
flow velocities are reduced and sediment particles have the opportunity to settle out of suspension.
Temporary sediment control ponds (Figure 7.8)
should be constructed to receive flows from any
drainage areas larger than 2 ha, while sediment
traps should be used for areas under 2 ha. While
detention tanks can be useful in a variety of
circumstances, they are often used to provide
detention over the shorter term and where space to
construct a pond is limited, such as during
dewatering activities. Active treatment systems —
which typically incorporate detention tanks and
sometimes include polymer flocculants — are also
useful for treating stormwater with elevated levels of
sediment or other contaminants while occupying a
comparatively small amount of space.
Figure 7.8: Temporary sediment control pond
The efficacy of detention ponds and sediment traps is largely dictated by (i) the extent to which they are
properly sized and constructed as designed, (ii) whether the banks are stabilized immediately following its
construction, and (iii) the extent to which they are regularly cleaned out / maintained. Even when detention
BMPs are well designed and performing as intended with respect to sediment removal efficiency, effluent
sediment levels can still be elevated above the thresholds required to protect aquatic habitat. Reducing the
inflow sediment concentration and volume conveyed to detention BMPs is a key way to achieve lower
effluent sediment concentrations. Techniques that prevent erosion and promote infiltration and
evapotranspiration of stormwater are particularly effective in this regard. Practices such as development
phasing, retention of existing vegetation, and provision of shallow soakaway / detention areas throughout
the site are all good examples of how this can be accomplished.
Toronto and Region Conservation Authority Page 34
Erosion and Sediment Control Guide for Urban Construction
7.3.4 Flow interruption
Flow interruption devices are barriers applied perpendicular to a flow pathway to reduce water velocity
and erosivity and to provide opportunity for sediment settling. While often permeable, flow interrupters are
not meant to serve as filters. Examples of this type of device included filter socks, wattles, logs and rock
check dams. Sediment control fence can be used for flow interruption for sheet flows but not across
concentrated flow paths. Flow interruption devices can also serve to redirect sheet flows towards a
treatment area.
These devices should be applied perpendicular to flow in runoff conveyance channels, across slopes
(perpendicular to sheet flows), around soil stockpiles, at site perimeter (usually sediment fence) and along
the up -gradient side of natural water features.
Flow interruption can also be applied to mitigate wind erosion. Windbreak fencing, which often consists
of mesh sheeting held by structural supports, can be applied like water flow interrupters: perpendicular to
the prevailing wind flow path at regular intervals that are determined based on the height of the fencing.
7.3.5 Filtration
Filters used in ESC are typically fabric, and are defined by their apparent opening size (AOS), which is
the largest opening available through which soil particles can pass. Manufactured geotextile filter fabric
with a known opening size will filter out all particles that are larger than the AOS. In this way they differ
from flow interrupting devices, although they do also provide the added benefit of reducing flow velocities
and thereby increasing sediment settling. Examples of filtration BMPs include sediment (dewatering) bags
and storm inlet filters.
7.3.6 Flocculation
Polymers flocculants are chemicals that encourage sediment particles to bind together to form larger
aggregate masses. These larger, heavier masses are more susceptible to gravitational settling in water
detention areas and more readily removed when passed through a filter. Flocculants can be used on
construction projects to enhance removal of suspended sediment, particularly in situations where the
sediment -laden water cannot be detained long enough to allow particles to settle. They are often applied
in conveyance systems like interceptor swales or, in detention practices like weir tanks. Detailed
guidance on the application, design and installation of polymer flocculant based sediment removal
systems are provided in Appendix B2.
7.4 Dewatering protocols and best practices
Most construction projects will at some point require active water movement; applying effective ESC
measures during these dewatering activities is an important way to reduce offsite sediment migration.
Dewatering protocols define methods for carrying out water movement activities, whether planned or
unforeseen, such that the water is treated as needed and discharged in a way that does not contribute to
erosion. An effective ESC plan should include dewatering protocols that direct onsite staff on how to
handle active and passive pumping discharges. A detailed drawing of the dewatering set up should
always be included in ESC plans.
Toronto and Region Conservation Authority Page 35
Erosion and Sediment Control Guide for Urban Construction
Common construction activities involving dewatering of sediment laden water include:
• Sediment control pond dewatering to facilitate re -grading, maintenance or cleaning/dredging;
• Pumping out stormwater that accumulates in excavated (e.g. excavations for basements or
underground services) or low lying areas following a large storm event;
• Using a sump pump to remove groundwater in excavations that extend below the water table; and
• Repair or replacement of underground services (e.g. storm sewer).
For planned dewatering the ESC plan should be specific on the treatment and location of discharge.
Advanced planning of these activities will ensure that potential ecological impacts have been addressed
and mitigated. The following are key factors to consider during the development of a dewatering protocol.
• Allowable water movement rates specified in permits. In Ontario a Permit to Take Water
(PTTW) or Environmental Activity and Sector Registry (EASR) registration may be required when
taking more than 50,000 litres of water in a day from a surface or ground water system. If pumped
water is being discharged to a municipal sewer, discharge permits are typically required. While specific
permit requirements will vary by municipality, they typically specify a maximum allowable discharge
rate and water quality standards.
• Receiving system water quality standards. Water discharged directly to a municipal sewer
(either storm or sanitary) is often subject to the applicable municipality's sewer use By -Law and the
relevant contaminant limits defined therein. When dewatering discharge is being released into a
natural water feature, the turbidity targets detailed in section 10.2.2 are applicable.
• Temperature standards for discharge to natural features. Water released to natural features
should fall within an appropriate temperature range based on the natural regime and types of aquatic
organisms supported by that habitat. Groundwater may often be significantly cooler than the receiving
water system, so ensuring a gradual initial release is important to allowing aquatic organisms to adapt.
In cases where warmer water is being discharged to a receiving water system that supports cool water
species, like the provincially endangered Redside Dace, discharge temperatures should not exceed
24°C, as currently required by the Ministry of Natural Resources and Forestry. More detailed guidance
on mitigating thermal impacts associated with discharges is available in Environmental Effects
Assessment of Freshwater Thermal Discharge (Environment Canada, 2014).
• Proximity of groundwater dewatering to natural
surface water features. When groundwater is being
dewatered near a surface water feature, the water level
in the feature may be impacted by the dewatering,
depending on the zone of influence and the amount of
water being pumped out. It is important to understand
the groundwater condition in the area, through borehole
logging for example, in advance of preparing a
dewatering plan. If a natural surface water feature is
located within the anticipated zone of influence, the
local conservation authority should be consulted to
provide advice and help establish strategies for
preventing impacts to the hydrology of the surface
water feature.
Figure 7.9: A wetland
• Erodibility at discharge locations. Preventing erosion at the outlet of a dewatering system can
be just as important as sediment removal/treatment methods used in the system. Erosion mitigation
starts with stabilization of the discharge/outlet area and the entire flow path from the outlet to the
Toronto and Region Conservation Authority Page 36
Erosion and Sediment Control Guide for Urban Construction
receiver. Stabilization with stone and geotextile, vegetation or rolled erosion control products (e.g.
blankets) may be appropriate in this type of application, depending on the anticipated flow rates. Flow
dispersion and energy dissipation should also be applied, particularly if flow rates are high or
concentrated. Outlet protection is described in more detail in Appendix B1.
Requirements for quality and/or quantity monitoring. Permits issued for dewatering activities
— such as PTTWs, conservation authority permits (under the "Development, Interference with
Wetlands and Alterations to Shorelines and Watercourses' regulations), MECP permits or
authorizations under the Endangered Species Act (S.O. 2007) and sewer discharge permits — often
include requirements for periodic or continuous monitoring of the quality and amount of water being
moved. Guidance on turbidity monitoring of construction site discharges is provided in chapter 10.
Contingency plans. Protecting natural features in the event that water treatment or erosion
mitigation measures are failing during dewatering requires contingency planning. An effective
contingency plan can be implemented on short notice, which means that the materials and equipment
needed should be readily available to use if needed. A proactive approach to a potential water quality
issue would be to have a plan to get a dewatering tank or active treatment system on site and installed
quickly if needed. The preferred course of action in any situation where the treatment system in place
during dewatering fails is to immediately cease dewatering activities until the issue is resolved.
The extent to which these factors will apply to a given dewatering activity depends largely on the volume
of water being moved, where the water is coming from and where it is being discharged. Provincial
permitting requirements related to water movement — known as the Permit to Take Water (PTTW)
administered by the Ontario Ministry of Environment, Conservation and Parks — are detailed in Chapter
9.0. The following subsections detail suggested best practices to apply during dewatering activities.
Figure 7.10: A multi-barrier/treatment train
approach to dewatering with a sediment bag
Dewatering bag
Geotextile dewatering bags are commonly applied to
filter water during pumping activities. As water is
pumped through the bag, sediment is removed through
filtration and gravitational settling caused by energy
dissipation. The bag also disperses the water from the
pump hose, preventing erosion typically associated with
concentrated flows.
The dewatering bag should be placed on a relatively flat
surface - to ensure the bag doesn't shift downslope —
and in an area at least 30 m away from any natural
water feature. Vehicle accessibility should be
considered to ensure that the bag can be transported away when full. The placement of the bag on a
stabilized surface, such as a grassed area or rock pad, will help to mitigate erosion. For a multi -barrier
approach to dewatering through a sediment bag, see TRCA ESC Design Drawings 1 & 2 in Appendix
B2. Bags should be inspected regularly and replaced when full, or if water discharged from the bag
remains turbid. If water contains a large proportion of fine sediments and remains turbid following
treatment, it may be appropriate to use a polymer -based treatment train approach as described below.
Additional design and inspection guidance for sediment bags is provided in Appendix B2.
Toronto and Region Conservation Authority Page 37
Erosion and Sediment Control Guide for Urban Construction
Polymer -based treatment train
In some circumstances it may be useful to promote
greater settling during dewatering by using a polymer
flocculant, which causes sediment particles to bind
together. They are best applied to enhance sediment
settling when turbidity levels are high and adequate
detention times cannot be provided. This is often the
case during dewatering, as space constraints typically
don't allow for the construction of a large detention
area. Flocculants can also be helpful when the water
being moved contains a large proportion of fine
sediments since these are difficult to settle out of
suspension.
A common polymer -based treatment train is a
dewatering ditch (Figure 7.11). Pump discharge is
released into a ditch system designed to incorporate a
polymer flocculant to optimize settling of suspended sediment particles. The ditch should be set up to
provide opportunity for sediment removal by allowing for dosing, mixing, settling and final filtration.
Appendix B2 provides more detailed guidance on the application of polymer flocculants for clarification of
water on construction sites. Specific guidance on anionic polyacrylamide (PAM) is available in the Anionic
Polyacrylamide Application Guide for Urban Construction in Ontario (TRCA, 2013).
Figure 7.11: Polymer -based treatment train
in a dewatering ditch
Dewatering tanks
Figure 7.12: Weir tank
Weir tanks (Figure 7.12) can be an important
treatment option during construction site
dewatering, as these systems detain water to
promote sediment settling. Large volume tanks
are particularly useful when anticipated pump
rates are high. Compared to other detention
measures that are built on site, like basins or
sediment traps, tanks can be a convenient
solution for short duration dewatering activities,
since they are readily transported on and off
site.
In order to prevent erosion, stabilization
measures and flow dissipation should always be
applied in the area where the tank discharges.
Optimizing sizing with consideration for
sediment removal targets, particle size
distribution of sediment, anticipated pump rates
and tank rental costs is necessary to ensure the
system will achieve the desired outcomes. Dewatering (weir) tanks are addressed in more detail in
Appendix B2.
Toronto and Region Conservation Authority Page 38
Erosion and Sediment Control Guide for Urban Construction
Active treatment systems
Active treatment systems (Figure 7.13) used on
construction sites offer more intensive water
treatment and are typically applied when:
water contains elevated levels of certain
contaminants of concern, or
• only sediment removal is required but simpler
alternative practices cannot achieve the
necessary removal rates.
They can be particularly useful where effluent
discharges directly to sensitive features (e.g.
habitat for species at risk). These systems
incorporate weir tanks, flocculants and filters in
order to achieve a high contaminant removal rate Figure 7.13: Active treatment system
while occupying a relatively small footprint. They
differ from a passive polymer treatment train in that they offer more precise control of the treatment
processes, such as flocculant dose metering and filter backwashing capabilities. They may incorporate
hydrodynamic processes for physical separation of floatables and suspended particles from the water.
Active treatment systems are highly customizable and can range from simple to complex, depending on
the components included, the types of contaminants being removed and the removal rate required.
Additional guidance on active treatment systems is provided in Appendix B2.
7.5 Protecting aquatic habitat during in and near water works
Watercourses are complex ecosystems that support a wide range of
aquatic habitats and species. They can be flowing with water,
intermittently wet, or dry, and include headwater drainage features,
swales, creeks, streams, rivers, floodplains, lakes, ponds and wetlands.
Some channelized creeks, constructed ditches or municipal drains may
also be considered streams.
Any proposed in -water or near -water works must protect fish and
wildlife habitat. This includes the surface water feature, as well as the
vegetated Tloodplaln areas that provide nutrients and shade to the
watercourse, wetland, etc. Fish habitat includes watercourse, streams, ditches, ponds and wetlands that
provide water, food, or nutrients into a fish -bearing stream, even if they do not contain fish or if they have
temporary or seasonal flows. Additional information on permitting and policies related to these activities,
and guidance on the relevant agencies to consult, are provided in Chapter 9.0.
In -water works should be avoided if possible, and may be viewed as a last resort. The rationale behind
this is to minimize potential ecological impacts, as in -waterworks are very intrusive to aquatic habitats
and are considered high risk. In -water works can disrupt corridor function and linkages and result in
temporary or permanent impairment or loss of aquatic and riparian habitat.
This section identifies standards and recommended best management practices for the planning, design
and construction of both in -water and near -water projects. Detailed guidance and design drawings
relating to best management practices for in and near water works are provided Appendix C.
Toronto and Region Conservation Authority Page 39
Erosion and Sediment Control Guide for Urban Construction
7.5.1 In -water work
In -water works refer to any works within a stream channel, wetland, lake or pond. This may include new
construction, retrofits or any maintenance activity. Examples include:
• Installation or removal of temporary and
permanent stream crossings — culverts,
bridges, etc.
• Infrastructure construction
(pipelines/conduits/etc.)
• Maintenance of stream crossings or other
infrastructure
• Emergency works
• Installing or repairing stormwater outfalls
or water intakes
• Spill clean-up
• Erosion protection works
• Stabilization of streambanks / shorelines
• Habitat enhancement and restoration
• Dredging
• Construction or repair of docks or dams
Figure 7.14: In -water worksite isolation
All machinery working in the water should have containment for spills and leaks, so that fuel, or other
hazardous liquids do not contaminate the aquatic community. For example, excavators may require
'diapers' to prevent leaks and spills. It is also recommended that all refueling or maintenance of
equipment occur outside of the watercourse, and a minimum of 30 metres from any surface water feature,
in order to prevent spills.
Working in the dry
To effectively isolate in -water works, and to 'work -in -the -dry', a physical, water -proof barrier needs to be
installed within the surface water feature, or between the work area and the surface water feature
requiring protection. The entire work area needs to be completely isolated. Water from the work area
must then be removed and treated prior to release to the environment. Only clean water should be
discharged back to the environment. Typically, dewatering effluent should be treated, and released a
minimum of 30 metres from any surface water feature. The discharge location and flow path should be
well vegetated or otherwise stabilized so that erosion of soil does not occur at the discharge point, and
treated water does not pick up any additional sediment along the flow path back to the receiver. For any
excavations, groundwater or seepage may also need to be removed from the work area. All water from
the work area must be treated before release to the environment. Please refer to Section 7.4 on
dewatering protocols for additional information.
Working in the we
On occasion, in -water works may be permitted to be completed 'in -the -wet'. In these instances a turbidity
barrier or other method may be used to isolate the work area and keep sediment from moving into the
rest of the waterbody. Under some circumstances, work may be carried out in -the -wet without isolation of
the work area. This is considered when the installation and removal of isolation measures are deemed to
be more harmful to the aquatic system than proceeding without work area isolation. Some of the factors
Toronto and Region Conservation Authority Page 40
Erosion and Sediment Control Guide for Urban Construction
that come into play when deciding whether to work in -
the -wet without isolation are: potential for risk to the
aquatic community, existing aquatic habitat conditions,
type of work proposed, and the duration and timing of
the work.
As an example, works may be proposed that would
occur more quickly and efficiently if isolation is not
installed. In this case there may be a net benefit to
getting in and out as quickly as possible, and putting in
isolation measures could do more harm to the aquatic
community than the work itself. Permissions
associated with carrying out works without isolation
measures are subject to approval by the local CA and
other relevant regulatory agencies.
Work area isolation
Figure 7.15: Turbidity curtain applied to
isolate a work area when working in the wet
When works occur in a watercourse, flows must always be maintained to downstream reaches. This may
be achieved by limiting the work area to a portion of the width of the watercourse, so flows can continue
unhindered around the work area. The amount of watercourse that may be blocked/restricted should be
determined with input from the approval authority. Alternatively, on smaller watercourses the entire flow
may need to be blocked, as long as clean creek water is effectively diverted from upstream to
downstream of the work area. Stream flows do not require treatment, and can be directly discharged back
into the creek, provided there is some erosion protection on the creek bed to prevent scour (see Appendix
C for design guidance and drawings). Only the water removed from the work area requires treatment prior
to release back to the environment.
Methods of creek flow diversion include dam and pump, by-pass
with a temporary channel or flume, and others described in
Appendix C. Dam and pump diversions are generally used for
short term projects lasting a week or so. Pumps require a high
level of inspection and maintenance, which is not efficient for
longer term projects. Temporary by-pass channels and flumes are
typically used for longer term projects of a few weeks, months or
years. Sizing of any barriers and diversions should be determined
by consultation between the consultants designing the measures
and the approval authority. Guidance on sizing of barriers and
diversions is provided in Appendix A, which describes the
Specified Flood Risk Calculation and Appendix C, which details in
water BMPs. The local CA or other relevant permitting agency
must be consulted to determine the sizing of isolation measures
such as cofferdams.
In -water works for which isolation measures are applied will often require a fish and wildlife
rescue/relocation plan. As the in -water work area is dewatered, and the water levels decrease, any fish,
amphibians, reptiles, or other organisms require rescue and relocation by a qualified biologist. The rescue
and relocation of fish and wildlife may require collector's permits / authorizations from the MNRF or, if
Toronto and Region Conservation Authority Page 41
Erosion and Sediment Control Guide for Urban Construction
species at risk are involved, the MECP and Fisheries and Oceans Canada. These agencies should be
consulted to determine project and location specific requirements.
7.5.2 Near -water work
Near -water work refers to activities occurring in close proximity to a surface water feature, or activities
occurring within its catchment and draining directly to the feature. They can include any works within a
valley, ravine, or in a floodplain. Some examples of near water work include:
• Road works;
• Grading;
• Temporary and permanent stream crossings which avoid intrusion into the stream;
• Stormwater outfalls/channels that are set back from a stream;
• Ditching;
• Tree removals with grubbing/soil disturbance;
• Infrastructure installed on the floodplain, valley slope or tunneling under a stream (e.g. pipelines /
conduits);
• Terrestrial habitat enhancement and restoration; and
• Groundwater dewatering.
These activities have the potential to impact the aquatic habitat, either directly or indirectly. Near -water
works are usually assessed by their level of risk to the surface water feature. Some works may be
immediately adjacent to the feature but due to the topography, may not drain directly to the feature,
thereby involving a low level of risk. As a result, fisheries or construction timing windows or other
restrictions may not apply. Alternatively, a work area that is further removed from the surface water
feature but draining directly to it may be classified as having higher risk of sediment contamination. For
example, roadwork or grading at the top of a hill, draining directly to a watercourse, may require additional
mitigation or timing restrictions.
7.5.3 Effective design for in and near water works
Both in -water and near -water works should have a minimal footprint. Encroachment into the floodplain or
surface water feature should be minimized to the extent possible. This will help to maintain stream
capacity, floodplain processes, and to minimize habitat destruction. Fish and wildlife passage should also
be maintained.
All in -water construction methods should be clearly defined on the plans and contingency plans should be
provided to outline actions to take if issues arise during construction (e.g. ice jams, flood conditions).
Works should be carried out in an efficient and timely manner to minimize the time in and around the
water.
All in -water and near -water works should be scheduled such that works are completed outside of the
restricted activity timing windows listed in Table 7.1. These timing windows ensure that aquatic habitats
are protected during critical life stages, such as spawning, juvenile stages and migration. Fisheries timing
windows can also be called construction timing windows, and indicate when work is to be conducted. If
the proposed works cannot be completed outside of the indicated spawning times, a timing window
extension may be required, or the work may need to be phased over more than one year. MNRF is
responsible for all fisheries timing windows in Ontario, and may defer to a local CA for some or all timing
Toronto and Region Conservation Authority Page 42
Erosion and Sediment Control Guide for Urban Construction
window applications and / or extensions. Proponents should consult with either the local CA or MNRF to
determine all timing windows and if extensions may be granted.
Table 7.1: Ontario restricted activity timing windows for protection of fish and fish habitat during in -water
and near -water works (source: Fisheries and Oceans Canada, 2013)
Walleye
Northern Pike
a
m
Lake Sturgeon
CL
w
rn Muskellunge
c
3 Large/
m
CL Smallmouth Bass
rn
c
CL
Rainbow Trout
U)
Other/Unknown
Spring Spawning Species
Lake Trout
N Brook Trout
v
U
W
CL Pacific Salmon
rn
c
3 Lake Whitefish
m
a
Lake Herring
LL
Other/Unknown Fall
Spawning Species
April 1 to June 20
April 1 to June 15
May 1 to June 30
May 1 to July 15
April 1 to June 20
April 1 to June 15
May 1 to July 15
May 15 to July 15
May 15 to July 15 May 15 to July 15
March 15 to May 31
March 15 to May 31
May 1 to June 30
March 15 to May 31
May 1 to July 15
April 1 to June 15 April 1 to June 15 March 15 to June 15
April 1 to June 15
Sept. 1 to May 31
Sept. 1 to June 15
Sept. 1 to June 15
Sept. 15 to May 31
Oct. 1 to May 31
Sept. 1 to June 15
April 1 to June 15
Sept. 1 to May 31
March 15 to July 15
Oct. 1 to May 31
Sept. 1 to June 15 Oct. 1 to May 31
Sept. 1 to June 15
Sept. 15 to May 15
Oct. 1 to May 31
Sept. 1 to June 15
Sept. 15 to May 31
Oct. 15 to May 31
Oct. 15 to May 31
Oct. 1 to May 31
The type of isolation measures must also be appropriate for the proposed works, time of year, and
sensitivity of the habitats. Isolation measures may require specific design considerations, depending on
the type of waterbody in, or near, the work area. For example, if works occur within a large river system
during the winter, ice build-up and ice flows should be considered. In this instance the coffer dam may
require sheet piling or metre bags for support. Please refer to Appendix C for additional information, and
some of the various isolation measures currently used.
Toronto and Region Conservation Authority Page 43
Erosion and Sediment Control Guide for Urban Construction
An effective in -water or near -water work plan should consider the following:
• Erosion risk — carry out an erosion risk assessment and choose and place BMPs to mitigate erosion in
the highest risk areas
• Minimize work area footprint— reduce encroachment into the natural feature and minimize habitat
destruction
• Know your site — How could site conditions change during construction? Where are the ecological
sensitivities? What requires protection?
• Plan how water is to be managed for each stage of construction including treatment and discharge
pathway
• Begin the design with erosion controls, and follow up with sediment controls
• Phase stripping and construction to minimize extent and duration of exposed soils
• Prevent the release of deleterious substances, including sediment
• Multi -barrier approach — be proactive and have back up controls (redundancy) in place
• Completely isolate work area from the influence of surface water
• Stabilize exposed soils as you go
• Work in co-operation with regulatory staff
• ESC plan is dynamic — need to manage unexpected conditions and update plans accordingly
• Regular inspections, documentation, maintenance and follow-up
Toronto and Region Conservation Authority Page 44
Erosion and Sediment Control Guide for Urban Construction
7.6 Protecting low impact development sites
As the practice of stormwater management in Ontario continues to move towards more decentralized
approaches like Low Impact Development, it has become necessary to re -imagine the way sites are
planned from a water management perspective. That also means rethinking stormwater management on
construction sites where LID practices are planned. The following subsections provide guidance on
protecting LID stormwater measures during the construction process. More detailed information on LID
construction is available in Credit Valley Conservation's Low Impact Development Construction Guide
(2012) and the Canadian Standards Association (CSA) Standard W201-18: Construction of Bioretention
Systems.
LID practices that may be compromised as a result of inadequate protection during construction are those
applied at or below ground level to infiltrate stormwater. They include, but are not limited to the following:
• Bioretention areas
• Permeable pavement
• Infiltration trenches and chambers
• Enhanced grass swales
• Tree cells
• Exfiltration systems
• Other landscaped areas designed to receive stormwater and infiltrate stormwater.
Figure 7.16: Infiltration LID practices that can be vulnerable to impacts from construction. Clockwise from
top left — bioretention area, permeable interlocking concrete pavement, underground infiltration chambers,
enhanced grassed swale.
Toronto and Region Conservation Authority Page 45
Erosion and Sediment Control Guide for Urban Construction
If protection measures are not in place, the functionality of LIDS may be compromised during site
construction in the following ways:
• Clogging with sediment
• Erosion of inlets and beds (for planted areas)
• Subgrade compaction by heavy machinery
• Contamination by substances in construction runoff
A lack of understanding of the system can also result in damage to components like pipes and geotextile
fabric. The risk of damage to LID measures continues throughout the construction process — from topsoil
stripping to building construction — until the site is permanently stabilized. As such, it is necessary to
maintain LID protection measures from the start of construction until:
• construction is complete;
• contributing drainage area is stabilized; and
• construction vehicle mud tracking has ceased.
Because LID measures are vulnerable to construction impacts that can reduce their functionality and lead
to costly future repairs, it is imperative that project team members — from designers to inspectors to
contractors — communicate effectively to ensure a high level of protection is maintained at all times. The
establishment of a builder's agreement can be useful in ensuring protection of LIDs during construction,
as they secure the contractor's and sub -contractors' commitment to keeping the LID installations
functional (CVC, 2012). Municipalities can also require a letter of credit from the developer, which is tied
to LID assumption protocols, and as such only refunded post -construction once the LID measures are
confirmed to meet the pre -determined performance criteria. This is similar to the letter of credit system
used during municipal assumption of subdivisions once they have been constructed and stabilized.
7.6.1 General best practices for LID protection
Phase construction so that LID measures are constructed last. Planning for the
construction of LID measures late in the construction project, where possible, helps to mitigate the
sedimentation of infiltration LIDs. If LID measures must be fully or partially constructed earlier, while
much of the site is still bare and unstabilized soil, consider protection strategies described in Sections
7.6.2 — 7.6.4.
Identify and mark LID areas and increase awareness. Ensure LID areas are properly
identified on ESC plans as well as on the site. In new development sites, clear signage is critical to
protecting LID areas, and signage indicating 'no heavy equipment' is particularly important for intended
infiltration areas. Areas designated for LID installations should also be sectioned off (e.g. fenced) early
in the construction process, when ESC measures are being installed. All staff should be aware of best
practices for protecting these areas.
• Keep LID perimeter controls in working order throughout construction. Even short term
failure of perimeter controls protecting LIDs can result in significant sediment deposition within the
area and impacts to its functionality. Perimeter controls should be installed early and kept in place
until the site is stabilized and vehicles are no longer tracking mud onto the pavement surfaces that
drain into the LID measure. Examples of perimeter controls that are appropriate for protection of LIDs
Toronto and Region Conservation Authority Page 46
Erosion and Sediment Control Guide for Urban Construction
are filter socks, sand or pea gravel bags, natural fibre logs and wattles, and sediment fence. Detailed
guidance on application of perimeters BMPs is provided in Appendix B.
• Protect LID inlets. LIDS that are kept offline during construction, which is the best approach for
ensuring protection of the area, require the installation and maintenance of an impermeable physical
barrier at the inlet. For example, curb cuts that serve as inlets for bioretention areas can be blocked
off from receiving flows with sand bags or wood. For LIDs that are receiving runoff, permeable barriers
can be installed at the inlet to help settle and/or filter out suspended sediment before the water enters
the infiltration area. If underdrains and inlets meant to connect to the LID have accumulated
construction sediment, they should be cleaned and/or flushed before the LID is constructed and online.
• Avoid heavy equipment on intended infiltration sites. In order to avoid compaction of native
soil in LID areas, heavy equipment routes should be established as part of ESC plans. Signage
indicating 'no heavy equipment' should be installed early in the construction process to identify LID
measures, which should be sectioned off to keep all vehicle traffic off these areas.
• Inspect LID areas during ESC site inspections. ESC site inspections should be carried out
weekly and before and after rain or snowmelt events to determine whether ESC measures installed
are in good working order and functioning as intended. LID areas should be included in these
inspections to confirm that LID protection measures are adequate, or to flag any instances where ESC
repairs or enhancements are needed.
• Be mindful of stockpile locations relative to LID areas. Stockpiles of construction materials
should be stored down gradient of LIDs to the extent possible (z 30 m recommended), since they can
be a significant source of sediment that may be washed into the LID area. Sediment controls (e.g.
sediment fence, filter socks) should be installed around all stockpiles, particularly those that are
located up gradient of LIDs.
7.6.2 Protecting filtration and infiltration LIDs —flow diversion
The best strategy for protecting ground level filtration (e.g. grassed swales) and infiltration (e.g.
bioretention areas) LID installations is to keep them offline until construction is complete, the drainage
area is stabilized, and vehicle mud tracking has stopped. Diverting flows around LID areas offers several
benefits, including:
• Less risk of erosion and clogging with sediment;
• Greater opportunity for seeded/planted LID areas to become established; and
• Easier access to carry out additional construction, repairs or maintenance of the LID area
It is recognized that in some cases this cannot be achieved, and that the location of the LID area may
require that it be used as a temporary runoff detention basin. Options for protecting LIDs that are being
used for construction stormwater detention are provided in section 7.6.3.
Figure 7.17 provides a graphic depiction of methods used to protect an infiltration LID — a bioretention
area in this case — in a situation where the LID can be constructed and then kept offline until drainage
area construction and stabilization are complete. The top picture shows a sacrificial layer consisting of 10
cm of growing media or 5 cm of sand laid on a liner — geotextile fabric or an 8 mil poly sheet — over the
final post -construction grade of the bioretention area. This sacrificial layer prevents the migration of
Toronto and Region Conservation Authority Page 47
Erosion and Sediment Control Guide for Urban Construction
sediment down into the growing media and underdrain. The layer should not be much greater than the
stated recommended thickness, as excessive material weight could contribute to substrate compaction.
The middle picture depicts a multi -barrier approach to protection of the bioretention area, with perimeter
filter socks and vegetative stabilization added on the sacrificial layer. With multiple barriers in place —
including flow diversion, perimeter control, a sacrificial layer and stabilization — this option would provide
the highest level of protection against sediment deposition in the bioretention area.
PROTECTING SURFACE INFILTRATION LID WHEN FLOWS CAN BE DIVERTED
Bioretention example
Bioretention is built but not
planted.
• A layerof growing media (210cm)
or sand (>_5 cm) and geotextile is
added on top of the final post
construction grade of the BMP.
• Additional controls recommended
for enhanced protection of this
BMP would be the addition of a
compost biofilter sock or similar
permeable barrier surrounding the
area.
• Where possible the sacrificial
growing media or sand layer
should be stabilized.
• Bioretention depicted post -
construction and filled with water
during a storm event.
• This sacrificial protective layer of
sand or growing media is
removed once construction is
complete and BMP starts
receiving flow.
Figure 7.17: Methods used to protect surface infiltration LIDs that can be kept offline.
Toronto and Region Conservation Authority Page 48
Erosion and Sediment Control Guide for Urban Construction
7.6.3 Protecting filtration and infiltration LID areas used for temporary stormwater
detention
The use of ground level LID areas as temporary detention basins should be avoided if possible, as it is
associated with a higher risk of subgrade clogging and compaction from construction vehicles used to
remove accumulated sediment. In cases where LIDs must be used for construction stormwater detention
due to site topography and the layout of the development, protection measures can be applied to prevent
accumulated sediment from migrating into the subgrade.
Figure 7.18 provides a graphic depiction of the use of a bioretention area as a temporary detention basin
for construction runoff. As shown in the top image, the LID is not fully constructed — rather it is only
excavated down to 75 cm above the final post -construction base of the bioretention. Maintaining at least
75 cm of native soil between the base of the temporary detention basin and the final post -construction
base of the bioretention area ensures that fine particles will not migrate down into the subsoils.
PROTECTING SURFACE INFILTRATION LID WHICH IS USED AS A TEMPORARY DETENTION BASIN
Bioretention example
When Flows cannot be routed
around LID during construction
Retain >_75 cm native soil between
the base of the detention basin
and the final base of the LID when
complete.
Sediment accumulation in
detention basin removed during
excavation to construct LID.
Once LID is built, protect until
construction and stabilization are
complete.
• Bioretention depicted post -
construction and filled with water
during a storm event.
Figure 7.18: Protecting surface infiltration LIDs that are used as construction sediment detention basins
Sediment accumulated in the detention basin is ultimately removed as part of excavating to complete
construction of the bioretention. The CSA Standard "Construction of Bioretention Systems" recommends
scarification of any compacted native soil areas (CSA, 2018b). Once it is excavated and filled, ESC
measures — such as perimeter controls, inlet protection and stabilization - should be put in place to
protect it until all drainage area construction and stabilization are complete.
Toronto and Region Conservation Authority Page 49
Erosion and Sediment Control Guide for Urban Construction
The same principles described above for protection of a surface infiltration LID can be applied in
protecting a filtration LID — like a grass swale — when it is used as a temporary detention basin (Figure
7.19). In this case, the minimum depth of native soil between the base of the detention basin and the
final base of the grassed swale LID should be 30 cm.
PROTECTING SURFACE FILTRATION LID WHICH IS USED AS A TEMPORARY DETENTION BASIN
Grassed swale example
When flows cannot be routed
around a filtration LID during
construction.
• Retain 230 cm native soil
between the base of the
detention basin and the final
base of the LID when
complete.
Once LID is built, protect until
construction and stabilization
are complete.
Grassed swale depicted post -
construction, after removal of
the extra 30 cm of native soil
and final stabilization.
Figure 7.19: Protecting filtration LIDS that are used as construction sediment detention basins
7.6.4 Protecting underground LIDS
Underground infiltration LIDS, such as infiltration chambers and exfiltration systems, can be built early in
the construction process (e.g. during cut and fill) provided that they are protected by a barrier preventing
sediment laden construction runoff from entering the facility. A barrier, like a plug or bulkhead, should be
installed to keep construction sediment from clogging the LID and an alternative flow route and/or
detention area must be established. The underground infiltration facility should be kept offline until
drainage area construction and stabilization are complete and vehicle mud tracking has ended. Figure
7.20 shows a schematic of an exfiltration system which has been kept offline with a temporary plug in
order to keep construction sediment from clogging the system.
Toronto and Region Conservation Authority Page 50
Erosion and Sediment Control Guide for Urban Construction
Catchbasins
Figure 7.20: Exfiltration system schematic showing temporary plug keeping construction runoff out of the exfiltration area.
Toronto and Region Conservation Authority Page 51
Erosion and Sediment Control Guide for Urban Construction
7.7 Spill response and control plan
Developing a plan for responding, controlling and reporting
spills is an important component of ESC planning on
construction projects. While spills may not be a routine
occurrence, their impacts when they do occur can be
substantial. Responding to these incidents quickly and
effectively can greatly reduce the extent to which the
natural environment is adversely impacted, and the
resources needed for clean-up efforts. Having a spill
response and control plan in place is also an important way
to demonstrate due diligence in mitigating environmental
harm.
While the level of detail and type of information needed in a spill response and control plan may vary
based on project specific factors (e.g. location, activities planned, potential pollutants on site), the plan
should, at minimum, including the following information:
• Relevant emergency contact numbers, including both project and external contacts (e.g. Spills Action
Centre, municipal spills contact, land owner)
• Description of spills control equipment and materials that should be available on site, including
quantities and locations
• Description of actions to be taken in the event of a spill, including procedures for responding,
reporting, containment and clean up. If the required actions vary depending on the spill magnitude, all
potential scenarios should be addressed.
7.7.1 Spills prevention
As in many cases, an ounce of prevention is worth a pound of cure. Best practices for preventing spills
include:
• Be aware of all potential pollutants on the site. Some of the more common pollutants to be considered
on construction sites include fuels, concrete wash-out, and silUsediment, if it is released into natural
features.
• Consider potential pollutants and assess spill risk according to the intended use, quantity on site, and
their location relative to storm drain inlets and natural features. Materials Safety Data Sheets should
be available for reference as needed. Understanding the risks in advance is a key step towards
getting the appropriate protection measures in place.
• Plan to store pollutants in a secure area at least 15 metres away from natural water features, storm
drains or drainage channels. Maintain buffers around natural features, as detailed in Appendix B1.
• Ensure pollutants brought on site are delivered directly to the designated storage area, and that
deliveries are supervised by knowledgeable on site staff.
• Locate any designated vehicle maintenance areas at least 15 metres away from natural features and
storm drains.
• Ensure that the machinery and equipment used during construction operations in sensitive
environments is appropriately sized for the activity and also be well maintained.
Toronto and Region Conservation Authority Page 52
Erosion and Sediment Control Guide for Urban Construction
• Keep a spill kit on site in a central location (e.g. near construction trailer) and in key vehicles, and
ensure that staff understand how to use it to clean up minor spills. Major spills need to be reported as
described in the next section, and mitigation and clean-up efforts may require the advice and
involvement of regulatory agencies.
• Keep instructional information and key spills contacts in a central location known to staff, ideally with
the spill kit.
• Inspect pollutant storage areas regularly and ensure that control measures around them are kept in
good working order. Ensure that pollutant storage containers are properly sealed and undamaged.
• Maintain ESC measures and carry out regular inspections at the frequency detailed in Section 10.1.2.
Ensure ESC measures are robust and capable of holding up during large rainfall events.
• Prioritize ESC in areas of the site that are highest risk, as identified using the erosion risk assessment
methodology detailed in Chapter 6.0. Large sediment releases often occur as a result of a major
ESC deficiency, such as a slope failure due to inadequate stabilization, or the breaching of sediment
control pond banks. Identifying the high risk areas will allow for better placement of protection
measures and greater preparedness in the event of a sediment spill.
7.7.2 Spill response
All minor spills should be immediately contained, cleaned up and removed from site. Documentation of
the incident and clean-up actions should be kept with ESC inspection records and other key
documentation.
Signiffcant spills are those that have the potential for adverse impact on the water feature into which the
spill occurred. They should be reported immediately to the contract administrator and ESC inspector. The
contract administrator must notify the Ontario Spills Action Centre. The municipality, conservation
authority enforcement officer for that area, and the landowner/developer should also be notified.
Monitoring efforts and documentation of incident details and containmenticlean-up procedures should be
initiated immediately upon detection of the spill. Documented details of the incident, as well as updates
on site conditions and containment/clean-up efforts must be provided to the attending agency. The
Ontario Spills Action Centre requests reporting of the following details when reporting a spill:
• Reporting individual's name and phone number
• The name and phone number of the person or company in control of the product spilled
• Date, time and location of the spill
• Duration of the spill (if known) and whether the spill is ongoing
• Type and quantity of pollutant spilled, including hazard level or toxicity information
• Source of the spill and information on the cause
• Description of adverse effects
• Environmental conditions that affect the spill (weather, traffic, etc.)
• Actions being taken to respond
• Other agencies and parties responding
Toronto and Region Conservation Authority Page 53
Erosion and Sediment Control Guide for Urban Construction
Following reporting of the spill, an Environmental Officer from the Ministry of Environment, Conservation
and Parks will gather information, assess conditions and impacts, and ensure clean-up is properly
undertaken by coordinating with other regulatory agencies, providing advice and issuing orders if needed.
Toronto and Region Conservation Authority Page 54
Erosion and Sediment Control Guide for Urban Construction
8.0 ESC PLAN SUBMISSION REQUIREMENTS
The submission requirements for erosion and sediment control strategies outlined within the Guide are
organized based on three planning stages: early, intermediate and late, which align with both the land -use
and infrastructure planning processes. The terminology used to describe the planning stages varies from
municipality to municipality and between planning and environmental assessment processes. This method
uses the terms early, intermediate and late stages to generalize them and accommodate all of these
processes, as shown in Figure 8.1.
Watershed/
Subwatershed
Studies
Environmental Development Planning
Assessment Process Erasion and Process
Sediment Control
Guide
Early
Master Plan / Individual or
Agency Review and
High Level Planning (i.e.
Class Environmental
OP, Secondary Plan, MESP,
Stage
IIndividual
Assessment Phase t and 2
Input Into Strategy
Block Plans, FSS)
Intermediate
or Class
Agency Review and
Environmental Assessment
Draft Plan of Suhdivision
Stage
phase 3 and 4
Input into Strategy
Late
Detailed Design and
Agency Review and
Detailed design and
Construction Drawings (i.e.
Stage
g
Construction Drawin s
g
Permitting
Site Plans)
Figure 8.1: Agency plan review and permitting roles
Note: The planning instrument used to determine alternative alignments and the scale and level of
detail of information provided for the early planning stages may vary by municipality.
OP = Official Plan, MESP = Master Environmental Servicing Plan, and FSS = Functional Servicing Study
Although these requirements are presented separately according to each stage, they build on each other,
ensuring the required level of analysis is completed at the appropriate time to progressively inform planning
and design. It is therefore important to understand the requirements within each stage to ensure a
coordinated approach. The three stages are outlined below:
The early stages of planning refer to those activities in the environmental assessment and planning
processes related to establishing the layout of the proposed development or the need for infrastructure
and assessing alternative road or rail routing and alignments, as shown in Figure 8.1. The specific
planning instruments adopted to undertake this stage, and the level of detail of the information provided
varies by municipal jurisdiction. For example, for the planning process, the Master Planning stage may
Toronto and Region Conservation Authority Page 55
Erosion and Sediment Control Guide for Urban Construction
provide input into the official plan, which is then further articulated in the secondary plan or official plan
amendment stages. Master Environmental Servicing Plans, Block Plans, or Functional Servicing Studies
may also be prepared at this stage. However, in some cases, impact assessment and conceptual design
(intermediate stage) will also be undertaken through these studies. For the environmental assessment
process, the early stage covers Phases 1 and 2 of the process relating to the identification of the problem
/ opportunity and the evaluation of alternative solutions.
Conservation Authorities will review and comment, working towards conditional approvals of applications
at this stage based on efforts towards meeting the criteria as set in both conservation authority and
provincial guideline documentation.
2. Once the infrastructure or development plan has been established, and the preferred layout determined,
the activities in the intermediate stages of planning further refine the early stage planning decisions,
including impact assessment and development of alternative conceptual designs. For example, the draft
plan of subdivision phase and the Individual or Class Environmental Assessment Phases 3 and 4
represent intermediate stage planning activities. Conservation authorities will review and provide
comments based on meeting the objectives outlined in guideline documentation.
3. The activities in the late stages of planning further refine the conceptual designs completed during the
intermediate stages including development of the detailed design of the site. Conservation authorities
will review and approve final designs, including construction and ESC drawings, through the permitting
process.
8.1 Requirements for early stages of planning and design
During the early stages of planning and design, the focus of the erosion and sediment control works should
coincide with the overall planning stage: high level conceptualization, strategizing, and an effort to
understand the works to be conducted during subsequent design stages. In this manner, the efforts
provided during this stage will feed into further studies, helping guide the ESC strategy to minimize impacts
on the downstream receiving systems. It is understood that not all details of the proposed works will be
known, and that only general guidance is requested at this point.
To meet this end, the early planning stages documentation should incorporate discussion on early
strategizing for construction, using the engineering and ecological information at hand to determine the
level of erosion and sediment controls required moving forward. High level documents, including Master
Plans or Subwatershed Studies, can focus on the commitment for appropriate ESC strategies moving
forward, where a more informed strategy can be investigated during Block Plans, Functional Servicing
Studies or Individual or Class EA Phases. These strategies can include, but not be limited to:
Discussion related to an ESC monitoring strategy and timing, if necessary based on site specific
circumstances (see Chapter 10.0 for turbidity monitoring considerations);
• Conceptual construction phasing plans, if design has advanced to this stage; and
• Strategies to minimize unnecessary stripping of vegetation from the site.
These strategies can incorporate ecological and engineering information to determine the appropriate level
of ESC plan necessary.
Submission Requirements
Toronto and Region Conservation Authority Page 56
Erosion and Sediment Control Guide for Urban Construction
During the early planning stages, the following information should be provided with the appropriate
documentation:
• Commitments to developing an ESC strategy during the various planning and design stages;
• Discussions related to the sensitivity of the downstream receiving systems and an estimated level
of effort required during subsequent design stages; and
• If designs have advanced accordingly, a conceptual ESC strategy. Otherwise this can be provided
at later stages.
8.2 Requirements for Intermediate Stages of Planning and Design
During the intermediate stages of planning and design, the focus of the erosion and sediment control works
is on preparing site level strategies. The appropriateness of strategies prepared during previous planning
and design stages will be verified based on consideration of advanced information available related to the
site layout and grading requirements. Further, the works at this level will provide greater insight to the level
of effort required in preparing the final ESC plans and reports during the final planning and design stages.
The level of detail expected during the intermediate stage would consist of preliminary site plans, rough
grading requirements, and locations of required utilities, including stormwater management measures, with
varying levels of ecological and geotechnical information provided. Working with this, ESC designers can
determine the level of effort required at detailed design, including the following:
• If monitoring is determined to be required (see considerations in Section 10.2.1), a breakdown of
the monitoring plan should be prepared, including:
o What monitoring is required before and during construction (see section 10.2);
o What parameters will be monitored and how;
o Where the monitors will be located;
o How long monitoring will continue; and
o Who will conduct the monitoring.
If infiltration LIDS are proposed as part of the SWM measures, a conceptual strategy to isolate the
LID during construction (see Section 7.6) could be provided if that information is available at this
stage in the project. Otherwise, LID isolation should be addressed in the detailed design
submission.
• Investigations into construction phasing and stripping strategies can occur to reduce unnecessary
stripping.
Submission Requirements
• If required, detailed monitoring plan describing the above, detailing when the monitoring plan will
begin and outline a reporting scheme for the monitoring activity; and
• Preliminary level reporting discussing the current ESC strategy. If information on phasing and
stripping strategies is available at this stage of the project, they should be included in the
submission.
Toronto and Region Conservation Authority Page 57
Erosion and Sediment Control Guide for Urban Construction
8.3 Requirements for Detailed Design Stages of Planning and Design
During the detailed design stage, a comprehensive ESC report and drawings are prepared using the
strategies from previous design stages. The reports and plans need to clearly demonstrate the preferred
strategy, including ESC measures in relation to construction phasing. The following sections provide
more details for the report and drawing requirements.
Report
The purpose of the ESC report is to provide clarity to the ESC drawings, including discussion on specific
areas of concern, erosion risk outcomes (including mapping), and overall direction for the ESC strategy
during various construction phases. The report should be a stand-alone document that contains, at
minimum, the following information:
• Site Location
• Existing Site Conditions
• Proposed Site Alteration
• Construction Phasing;
• Erosion Risk Assessment (section 6.2.5)
• Design Details for Erosion and Sediment Control Mitigation;
• Inspection and Maintenance;
• Monitoring Plan (if necessary); and
• Professional Engineer Seal, signed and dated.
Refer to Table 8.1 for full details of the requirements of the ESC Report.
In specific circumstances, a monitoring plan may be required. In these instances, the information
provided in the ESC Report will vary from site to site, and continuous communication with the permitting
agencies will be necessary. In these instances, the monitoring plan information incorporated into the
ESC Report will be outlined during the intermediate stage.
Toronto and Region Conservation Authority Page 58
Erosion and Sediment Control Guide for Urban Construction
Table 8.1: ESC report content checklist — submission requirement during detailed design
Contact
I�
i. Identify, and define roles of, key personnel including but not limited to:
information /
Site owner, project manager / design engineer, ESC inspector, 24
definition of
hour emergency contact Chp. 5.0, Table 5.1
roles
ii. Outline chain of communication
Site location Location, key map and site area (ha)
**provide in report or reference plan with this information
Detail existing site conditions, including:
i. land cover and use
ii. vegetation
Existing site iii. general topography
conditions iv. existing flow patterns and external drainage
v. adjacent properties and their land uses, including identification of any
protected natural heritage features'
vi. soil characteristics.
Provide the following information about water system(s) that will receive
runoff / discharge from the site:
i. Identification / names of features/systems that will be receiving site
flows, whether natural (e.g. streams) or other (e.g. sewer system).
Receiving ii. Classification of natural receiving water body (coldwater, warmwater,
water system species at risk habitat)
iii. Summary of current aquatic habitat conditions
iv. Identification of confined or unconfined valleys
v. Physical description of receiver (e.g. critical erosion areas, channel
dimensions, slope, etc.)
Provide a brief discussion of the proposed activities, including:
Proposed i. description and location of permanent and temporary SWM measures
Site ii. plans for using permanent SWM facilities for sediment control during LID protection
Alteration construction measures (s. 7.6)
iii. LID details if applicable, including types, locations, and any controls /
methods applied to prevent sedimentation
Section If no, provide reason
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 59
Erosion and Sediment Control Guide for Urban Construction
Provide details on how ESCs will be implemented for each construction ESC BMP design
I. Provide a brief discussion on proposed construction phasing to
(App B)
Design
• For sediment ponds, include detailed calculations related to
minimize unnecessary stripping of the site and efforts to re -stabilize
Minimized or
permanent pool and active storage volumes, pond outlet and
Construction
inactive areas where possible.
phased land
❑ Yes
phasing
ii. Describe boundary of work zone(s), work proposed during each
clearing guidance
❑ No
placing BMPs.
stage, and approximate time to complete each stage.
(App. B, p. B1-2)
• Describe plans for site restoration / permanent stabilization, including
ESC planning (s.
iii. Identify any applicable ecological timing windows that affect schedule.
proposed seed mix with species and percentage composition.
6.2.5)
Erosion Risk
For applicable sites, provide documentation and results of Erosion Risk
ERA (Chip. 6.0)
❑ Yes
Assessment
Assessment (ERA) which are detailed in Chapter 6.0.
❑ No
Provide details on how ESCs will be implemented for each construction ESC BMP design
Describe the ESC inspection and monitoring program by detailing: Inspection and
i. inspection frequency monitoring
Inspection,
documentation and reporting protocol guidance ( Ch P 10 )
monitoring ❑ Yes
and iii. chain of communication Recommended
maintenanceprotocols for ❑ No
v. anticipated repair /maintenance timelines and continuous turbidity
v. monitoring protocols monitoring (s.10.2)
Turbidity targets (s.
Emergency Provide list of emergency contacts (e.g. site supervisor, regulatory 10.2.2) ❑ Yes
Contacts agency enforcement officer) and define the triggers (e.g. chemical spill,
elevated stream turbidity levels) that constitute an emergency. Spills response (s. ❑ No
7.7)
Sealing Report should be sealed, signed, and dated by a Professional Engineer. ❑ Yes
❑ No
Supporting ❑ Yes
documents If applicable, include: (I) soils report, (ii) sample ESC inspection form, (III) monitoring Protocol
❑ No
1 — Protected natural heritage features include: watercourses, wetlands, woodlands, valleylands, Areas of Natural and Scientific Interest (ANSI), Environmentally Significant Areas
(ESA), habitat of endangered and threatened species, fish habitat, seeps and springs, and significant wildlife habitat
Toronto and Region Conservation Authority Page 60
stage, including supporting calculations and design details.
(App B)
Design
• For sediment ponds, include detailed calculations related to
Sediment pond
details and
permanent pool and active storage volumes, pond outlet and
design (p. 62-32)
calculations
emergency spillway
Seeding & ❑ Yes
for ESC
• Where applicable, consider ERA outcomes when selecting and
restoration (App. G) ❑ No
measures
placing BMPs.
ERA outcomes for
• Describe plans for site restoration / permanent stabilization, including
ESC planning (s.
proposed seed mix with species and percentage composition.
6.2.5)
Describe the ESC inspection and monitoring program by detailing: Inspection and
i. inspection frequency monitoring
Inspection,
documentation and reporting protocol guidance ( Ch P 10 )
monitoring ❑ Yes
and iii. chain of communication Recommended
maintenanceprotocols for ❑ No
v. anticipated repair /maintenance timelines and continuous turbidity
v. monitoring protocols monitoring (s.10.2)
Turbidity targets (s.
Emergency Provide list of emergency contacts (e.g. site supervisor, regulatory 10.2.2) ❑ Yes
Contacts agency enforcement officer) and define the triggers (e.g. chemical spill,
elevated stream turbidity levels) that constitute an emergency. Spills response (s. ❑ No
7.7)
Sealing Report should be sealed, signed, and dated by a Professional Engineer. ❑ Yes
❑ No
Supporting ❑ Yes
documents If applicable, include: (I) soils report, (ii) sample ESC inspection form, (III) monitoring Protocol
❑ No
1 — Protected natural heritage features include: watercourses, wetlands, woodlands, valleylands, Areas of Natural and Scientific Interest (ANSI), Environmentally Significant Areas
(ESA), habitat of endangered and threatened species, fish habitat, seeps and springs, and significant wildlife habitat
Toronto and Region Conservation Authority Page 60
Erosion and Sediment Control Guide for Urban Construction
Drawings
The purpose of the ESC drawings are to provide a visual representation of the ESC strategy and
measures for the purposes of construction. The drawing package will support the ESC Report, with the
ESC drawings prepared to be able to provide all ESC information pertinent for the site. In order to convey
the ESC strategy effectively, the ESC drawings should provide, at minimum, the following information:
• Existing site conditions;
• Proposed site alterations;
• Construction phasing; and
• ESC design and details, which would include:
o A drawing for each stage of construction (see Section 7.2)
o ESC construction notes
o Emergency contact information
Refer to Table 8.2 for full details of the requirements of the ESC Drawings.
Toronto and Region Conservation Authority Page 61
Erosion and Sediment Control Guide for Urban Construction
Table 8.2: ESC drawings checklist — submission requirement during detailed design. "Note: not all projects require all drawings detailed here"
Standard notes
Sealing
Site address and application number
Key plan including site limits
Drawing scale
North arrow
Legend which includes identification of standard drawing elements and ESC
measures
In the event of an emergency, the following contacts need to be provided in the
ESC notes on all drawings:
The engineer responsible for the ESC drawings
Site supervisor
Pertinent agency enforcement officer
Examples include:
The ESC strategies outlined on the plans are not static and may need to be
upgraded/amended as site conditions change to prevent sediment releases to
the natural environment. Any changes from the approved ESC plans will be
documented and reported to the Enforcement Office.
Inspection of the proposed erosion and sediment control measures will occur
at the frequency defined in section 10.1.2.
All damaged ESC measures will be repaired and/or replaced within 48 hours
or sooner if environmental receptors are at imminent and foreseeable risk of
adverse impact.
Disturbed areas left for 30 days or longer must be stabilized.
• Temporary sediment conveyance systems and sediment pond to be
immediately stabilized (include stabilization method if possible, and notes on
seasonally appropriate stabilization practices)
Notes provided are for general reference only. Additional notes will be
required as necessary based on ESC measures and strategy employed.
All drawings must be sealed, signed, and dated by a Professional Engineer.
Consult with local
CA for notes ❑ Yes
required ❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 62
Erosion and Sediment Control Guide for Urban Construction
• Contour elevations at 0.5-1.0 m intervals;
• Drainage boundaries and directions;
Drawing 1: • Vegetation locations
Existing Site • Highly erodible areas, with a plan provided for any downstream areas where
Conditions erosion risk is a concern;
• Water body locations;
• Regional storm floodplain and regulation areas.
Include only if the submission does not include other engineering drawings (e.g.
CONDITIONAL SWM plan, or stage 3 or 4 ESC plan) that would show these details.
REQUIREMENT:
Proposed site • Show proposed site condition excluding ESC measures
alterations • A cut/fill plan showing existing and proposed contours and spot elevations
• Clearing, grading, and site boundary limits
• Proposed SWM measures and their locations, including LID
❑ 'Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 63
Staged ESC
• Based on existing conditions drawing
planning is. 7.2)
Minimized or
• Construction phasing details, including limits of disturbance, phasing
phased land
clearing (p. 131-2)
boundaries and construction sequencing details.
ESC BMPs
• Drainage areas identification, including delineation of all external and internal
guidance (App. B)
drainage boundaries, labels for catchment sizes (ha) and runoff coefficients,
Dewatering
Drawing 2: and depiction of overland flow routes
protocols is. 7.4)
Stage 1 ESC
Plan
Buffers (p. 131-2)
• Location and details for all ESC measures, including dewatering protocols to
ensure appropriate treatment of pumped water.
Perimeter controls
(App.B)
Vehicle tracking
• Identification of appropriate buffers / setbacks from natural features.
controls (p. B248)
Interceptor swales
• Placement of perimeter controls, with appropriate setbacks / buffers applied
(p' 131-9)
and consideration of more robust controls upslope of sensitive areas
❑ 'Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 63
Erosion and Sediment Control Guide for Urban Construction
Vehicle access points - locations and ESC measures applied — and
❑ Yes
identification of internal haul roads.
Check dams (p. 62-
❑ No
8 to 132-17)
Details on stormwater conveyance measures, including interceptor swale
Sediment control
dimensions and design flows, erosion prevention measures, and placement
ponds (p. 132-32)
❑ Yes
of check dams.
❑ No
LID protection
Details for temporary sediment control ponds, including:
during construction
(s.7.6)
i. Plan view of pond showing grading requirements
ii. Cross-sections of the pond, including length, width, and outlet structure
iii. Stage -storage tables showing adequate depth and volume
❑ Yes
iv. Details of storm inlet, outlet, emergency overflow and any associated
❑ No
drainage facilities
v. Stabilization techniques
vi. Plans for decommissioning or conversion to permanent SWM facility.
• Where applicable, LID locations and any measures applied to mitigate ❑ Yes
compaction of infiltration LID areas. ❑ No
Stockpiles and/or berm locations, sizes and ESC measures, including
stabilization for stockpiles idle for > 30 days.
Notes related to ESC requirements.
• Coordination with Stage 1 and Stage 3 Construction Activities ❑ Yes
Drawing 3: Stage ❑ No
2 ESC Plan
• Overlay of draft subdivision plan provided on ESC Plan (showing ultimate ❑ Yes
roadway and lot layout) ❑ No
Toronto and Region Conservation Authority Page 64
Drawing 4: Stage
3 ESC Plan
Erosion and Sediment Control Guide for Urban Construction
• Notes related to ESC requirements.
• Updated drainage area details, including delineation of all external and
internal drainage boundaries, labels for catchment sizes (ha) and runoff
coefficients, and depiction of overland flow routes Inlet protection (p.
•Catchbasin inlet protection types and locations (e.g. all rear lot and street 62-21)
catchbasins)
Updated locations and details for all ESC measures, including dewatering
protocols to ensure appropriate treatment of pumped water.
Updated details on stormwater conveyance measures, including interceptor
swale dimensions and design flows, erosion prevention measures, and
placement of check dams.
• Plan for dewatering sediment control ponds during construction of permanent
stormwater management facilities, including:
i. details on discharge locations;
it. measures for treating sediment laden water; and
iii. erosion prevention measures at discharge points.
ESC BMPs
guidance (App. B)
Dewatering
protocols (s. 7.4)
Interceptor swales
(p. B1-9)
Check dams (p. 132-
8 to B2-17)
Sediment ponds
maintenance (p. B2
32)
Dewatering
protocols (s. 7.4)
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 65
ESC BMPs
• Updated locations and details for all ESC measures, including dewatering
guidance (App. B)
protocols to ensure appropriate treatment of pumped water.
Dewatering
protocols (s. 7.4)
• Where applicable, LID locations and any measures applied to protect against
LID protection
sedimentation and compaction of infiltration LID areas.
during construction
(s.7.6)
• Updated drainage area details, including delineation of all external and
internal drainage boundaries, labels for catchment sizes (ha) and runoff
Inlet protection (p.
coefficients, and depiction of overland flow routes
62-21)
• Catchbasin inlet protection types and locations
• Notes related to ESC requirements.
• Updated drainage area details, including delineation of all external and
internal drainage boundaries, labels for catchment sizes (ha) and runoff
coefficients, and depiction of overland flow routes Inlet protection (p.
•Catchbasin inlet protection types and locations (e.g. all rear lot and street 62-21)
catchbasins)
Updated locations and details for all ESC measures, including dewatering
protocols to ensure appropriate treatment of pumped water.
Updated details on stormwater conveyance measures, including interceptor
swale dimensions and design flows, erosion prevention measures, and
placement of check dams.
• Plan for dewatering sediment control ponds during construction of permanent
stormwater management facilities, including:
i. details on discharge locations;
it. measures for treating sediment laden water; and
iii. erosion prevention measures at discharge points.
ESC BMPs
guidance (App. B)
Dewatering
protocols (s. 7.4)
Interceptor swales
(p. B1-9)
Check dams (p. 132-
8 to B2-17)
Sediment ponds
maintenance (p. B2
32)
Dewatering
protocols (s. 7.4)
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
Toronto and Region Conservation Authority Page 65
Erosion and Sediment Control Guide for Urban Construction
LID protection
• Where applicable, LID locations and updated details on any measures ❑ Yes
applied to protect against sedimentation and compaction of infiltration LIDs. during construction
(s.7.6) ❑ No
• Updated stockpiles and/or berm locations, sizes and ESC measures, ❑ Yes
including stabilization for stockpiles idle for> 30 days. ❑ No
• Notes related to ESC requirements. ❑ Yes
❑ No
Erosion control
• Planting / site restoration plan depicting all permanent stabilization measures BMPs (App. 61) ❑ Yes
and timelines Restoration ❑ No
guidelines (App. G)
• Plan for dewatering sediment control ponds during construction of permanent
Sediment ponds
stormwater management facilities, including:
maintenance (p. 132 -
iv. details on discharge locations;
32)
❑
Yes
v. measures for treating sediment laden water; and
Dewatering
❑
No
Drawing 5: Stage erosion prevention measures at discharge points.
protocols (s. 7.4)
4 ESC Plan
• Removal / decommissioning of ESC measures depicted in drawing and / or
❑
Yes
drawing notes.
❑
No
• Where surface infiltration LIDs are planned for the site, provide details on LID
❑
Yes
planting / stabilization.
❑
No
• Notes related to ESC requirements.
❑
Yes
❑
No
Toronto and Region Conservation Authority Page 66
Erosion and Sediment Control Guide for Urban Construction
9.0 APPROVALS PROCESS
The permits and approvals required for an urban construction project are dictated by relevant legislation
and various project and site specific circumstances. Having a clear understanding of these requirements
can save time and help to keep construction projects on schedule and on budget. A summary of the
legislative framework related to ESC is provided in Appendix D.
The review and approvals process related to ESC on construction projects will vary to some extent
depending on project details such as:
• Geographic location
• Whether the site is in a conservation authority regulated area
• Proximity to protected natural features (e.g. Environmentally Significant Areas, Provincially Significant
Wetlands)
• Presence of Species at Risk in Ontario (based on O.Reg. 230/08)
• Development type and construction activities planned (e.g. drilling, in water works, dewatering)
• Scale of development and associated ESC measures
The flow chart shown in Figure 9.2. illustrates the key factors that should be considered when
establishing which ESC permits and approvals will be required for a given project. Early consultation with
regulatory agencies is encouraged in order to allow time for any necessary permits and approvals to be
issued, and thereby avoiding costly delays. The following definitions are provided to clarify some of the
references made in Figure 9.2.
Limit of Development
The development limit is defined as the point to which
development can extend. For sites where CA permits are
required, the limit is established and agreed to by CAs during the
permit application process, based on the presence of natural
hazards and features.
In the case of a Planning Act application, the municipality makes
decisions about development limits but consults with CAs if the
proposed development affects CA regulated areas or CA
delegated responsibility for natural hazards. It is important to
finalize this boundary is early on in the ESC approvals process, as
it may differ from the property boundary and affect the amount of land area that can be developed. For
infrastructure projects, this is known as the limit of disturbance, because these projects typically require
the disturbance of land that is outside the boundaries of the actual infrastructure.
Conservation Authority regulated areas
The set of regulations known as "Regulation of Development, Interference with Wetlands and Alterations
to Shorelines and Watercourses' (Ontario Regulations 42/06 and 146/06 to 182/06) allow CAs to regulate
development and other activities taking place within valley and stream corridors, wetlands and associated
areas of interference, and the Great Lakes and inland lakes shorelines. These areas are often referred to
collectively as the 'regulated area', and specifically includes:
valley and stream corridors;
Toronto and Region Conservation Authority Page 67
Erosion and Sediment Control Guide for Urban Construction
• shorelines of the Great Lakes and inland lakes;
• watercourses;
• hazardous lands;
• wetlands; and
• other areas where development could interfere with the
hydrologic function of a wetland.
The regulated area represents the greatest physical extent of the
combined hazards plus a prescribed allowance as set out in the
regulation.
In the context of the regulation, the regulated activities that are
considered 'development' are:
• the construction, reconstruction, erection or placing of a building or structure of any kind,
• any change to a building or structure that would have the effect of altering the use or potential use of
the building or structure, increasing the size of the building or structure or increasing the number of
dwelling units in the building or structure,
• site grading, or
• the temporary or permanent placing, dumping or removal of any material, originating on the site or
elsewhere.
Additional activities that are regulated are those that would result in the straightening, changing, diverting
or interfering in any way with the existing channel of a river, creek, stream, watercourse or the changing
or interfering in any way with a wetland.
For more information on how the regulated area is defined, what specific activities are regulated, and the
requirements for obtaining a permit under the regulation, see The Living City Policies for Planning and
Development in the Watersheds of the Toronto and Region Conservation Authority (TRCA, 2014) or
contact the local conservation authority.
Conservation Authority commenting roles
Ontario CAs are required to comment on ESC plans as part of
their delegated responsibilities under the Ontario Planning Act
(RSO, 1990). Municipalities screen planning applications or
circulate them to CAs to determine if a specific application
requires CA review. If the location of the proposed development is
determined to be within the CA's area of interest, the application is
circulated to the CA for comment. CA areas of interest include,
but are not limited to: features and hazards governed under the
"Regulation of Development, Interference with Wetlands and
Alterations to Shorelines and Watercourses" regulations, areas
requiring special stormwater management controls, Areas of
Natural and Scientific Interest, Environmentally Significant Areas,
and CA property. The CA is required to provide technical review
and commentary regarding how the proposal would impact natural
hazards or natural heritage features and functions.
Toronto and Region Conservation Authority Page 68
Erosion and Sediment Control Guide for Urban Construction
Individual CAs also often have service agreements or memorandums of understanding with federal
departments, provincial ministries and/or upper or lower tier municipalities. These agreements dictate the
services the CA is required to provide based on their areas of interest and expertise. While these may
vary, they often include requirements to undertake regulatory or approval responsibilities and/or provide
technical review and comments.
For more specific information on conservation authority roles and policies related to review of ESC plans,
contact the local conservation authority. Additional information on ESC submission requirements is
provided in Chapter 8.0.
MECP Permit to Take Water
The Ontario Water Resources Act (R.S.O. 1990) requires that a Permit to Take Water (PTTW) be
obtained for water taking/movement in excess of 50,000 litres per day. The PTTW, which is issued by the
MECP, would be required during some dewatering activities common on construction projects, where
more than 50,000 Uday is being moved from a ground or surface water system, which may also include
sediment control ponds.
Exemptions to this permit requirement that may apply
during construction projects involving in -water works
are the active and passive watercourse diversion
exemptions. Active watercourse diversions — in which
water is moved by means of a pump — are eligible for
exemption if: (i) the water is returned to the same water
body and not stored or otherwise used, (ii) ESC
measures are properly applied, maintained and
decommissioned, (iii) any fuel sources or re -fueling
activities are located at least 30 m away from the
watercourse, and (iv) upstream and downstream water
quality and quantity are unaffected by the diversion.
Exemption for a passive diversion — where no pump is
Figure 9.1: Watercourse diversion during
construction is exem t from re uirin a PTTW
used — simply requires that the upstream and p q g
downstream water levels are unaffected, and that water is simply re -directed but never moved out of the
water body.
Some construction -related water takings that are greater than 50,000 Uday can also be exempt from
requiring a full PTTW, instead requiring only registry in the Environmental Activity and Sector Registry
(EASR). These include (i) ground or storm water taking during construction site dewatering if the average
taking is less than 400,000 L/day and (ii) taking from certain water bodies for a set of defined uses during
road construction (e.g. hydro -demolition, landscaping).
Species at Risk in Ontario
As described in Appendix D, the Species at Risk in Ontario List (O.Reg. 230/08) contains all extirpated,
endangered, threatened and special concern species that are protected under the provincial Endangered
Species Act (S.O. 2007). If the project site contains species on the list, consultation with MECP is
required to determine, based on the site and the activities planned, whether a permit or authorization is
required. The need for authorization can be avoided where it is possible to work around protected species
Toronto and Region Conservation Authority Page 69
Erosion and Sediment Control Guide for Urban Construction
and habitats so that they are not subject to any adverse effects. The MECP will provide direction on
options available to best protect these species, such as ESC best practices.
DFO Self Screening
For construction projects involving in or near water works, determining whether a Fisheries and Oceans
Canada (DFO) review and/or authorization is required must be done through a self -screening process.
The types of water bodies and projects that are exempt from requiring review are listed on the DFO self -
screening website. For projects that are subject to review, DFO will assess whether the activities
proposed can be supported through a Letter of Advice, or whether they will result in death or fish or
harmful alteration, disruption or destruction of fish habitat (as defined in the Fisheries Act), in which case
a Fisheries Act authorization would be required.
Toronto and Region Conservation Authority Page 70
Once development limits (see Chapter 9) have been determined with municipality and CA
Proponent submits development application to
municipality (includes ESC plans)
YES NO YES
No up
MECP review
MI required required
j
MECP PTTW or
EASR registry
required.
PTtW can
require
monitoring &
contingency
plans including
ESC.
NO
Site monitored by CACA issues conditional
enforcement permit (release upon
contractor sign off)
YES NO
CA permit
issue advice
application in
and/or require
relation to CA
ropone
proponent to apply for
NMECP M
authorization (permi;agreement
permit application to
or regulatory
regulation
exemption), which may
require additional ESC
CA issues
measures.
j
MECP PTTW or
EASR registry
required.
PTtW can
require
monitoring &
contingency
plans including
ESC.
NO
Site monitored by CACA issues conditional
enforcement permit (release upon
contractor sign off)
YES NO
CA permit
application in
required under
relation to CA
Proponent submits
responsibilities
application in
permit application to
relation to CA
regulation
CA (includes ESC)
(see Chapter9)
CA issues
YES
NO
CA confirms
application
recommendations
appllotion
to primary
complete or
Primary approval
ESC Plan
requests more
agency circulates
approval
information
application to CA
through
forcommenting
primary
primary approval
CA staff confirm
approval
agency (local
all issues and
requirements
addressed
vary)
CA reviews
application in
relation to CA
CA reviews
responsibilities
application in
under CA
relation to CA
regulation
responsibilities
(see Chapter9)
CA issues
comments on
CA issues
application
recommendations
to primary
approval agency
Proponent
revises
application and
Proponent revises
resubmits
application and re-
submits (through
primary approval
CA staff confirm
agency)
all issues and
concerns
addressed
CA staff confirm to
primary approval
agency that all
CA executive
issuesand
committee
concerns
approves permit
addressed
Erosion and Sediment Control Guide for Urban Construction
10.0 INSPECTIONS, MONITORING AND MAINTENANCE
Inspection, performance monitoring and maintenance of ESC measures on construction sites are critical
to ensuring that the ESC plan is effective at mitigating sediment release from the site. Beyond inspecting
the condition and functionality of ESC measures on the site, an effective inspection and monitoring
program requires ongoing assessment of adjacent natural features receiving runoff from the site. The
following sections detail the most effective strategies for inspecting, monitoring and maintaining your site
for the duration of construction.
Your ESC plan is only as good as your inspections and maintenance program!
Defining the three key activities that will keep sediment on your site.
INSPECTION
Routine walk through of construction site, carried out by a
qualified ESC inspector, to identify and report on deficiencies in
ESC measures.
MONITORING
Ongoing or periodic assessment of the quality of site discharge
and downstream receiving water systems in order to identify
potential changes/impacts associated with construction
activities. Parameters often considered are water quality
(mainly suspended solids or turbidity), water temperature, flow
rates, and erosion.
MAINTENANCE
Repair, cleaning and replacement of ESC measures based on
. a
needs identified through inspections and monitoring.
10.1 Developing an Inspection Program
The effectiveness of construction site ESC inspection is dependent upon its frequency and the immediacy
and robustness of actions taken to address any deficiencies. The objective of an inspection program is to:
• Regularly assess the effectiveness of individual ESC measures and the overall ESC plan
• Identify the need for maintenance (e.g. sediment removal) and repairs (e.g. replacement of damaged
silt fence)
• Identify areas where ESC measures should be replaced or augmented due to repeated failures
Toronto and Region Conservation Authority Page 72
Erosion and Sediment Control Guide for Urban Construction
As described in Figure 7.1, the ESC plan should evolve as necessary to ensure natural features remain
protected. The efficacy of the inspection program is contingent on applying the information collected
during inspections to adapt the ESC plan to the site conditions.
10.1.1 ESC inspector qualifications
The responsibility for ESC inspections typically belongs to the land owner of the site or their
representative. The owner should retain the services of an inspector who:
• Has completed training on ESC inspection
• Has experience conducting ESC inspections
• Is an effective communicator
All ESC inspections should be carried out by a professional who meets the criteria of Qualified Erosion
and Sediment Control Inspector (QESCI) or QESCI in training (QESCI-IT) as defined in the Canadian
Standards Association Erosion and Sediment Control Inspection and Monitoring standard (CSA, 2018).
Those who do not meet this criteria but who have obtained the Certified Inspector of Sediment and
Erosion Control (CAN-CISEC) designation will also be considered qualified to carry out ESC inspections.
The roles and responsibilities of the ESC inspector are detailed in Chapter 5.0.
10.1.2 Inspection frequency
During the initial installation of ESC measures on the site, the inspector should conduct an inspection to
ensure that all the controls are installed as shown on the approved ESC plan, and that they are installed
correctly. Once construction begins, a 'walk-through' inspection of the site should be undertaken in
anticipation of rain, extended wet -weather periods, snowmelt events, or any conditions that could
potentially yield significant runoff volumes or damage ESC measures. It is important to be aware of the
predicted forecast for the week and plan inspections accordingly.
Regular ESC inspections should occur during all construction stages, starting when the first ESC
measures are installed prior to topsoil stripping and ending when construction is complete and the site
has reached 80% stabilization. Where possible, it is also recommended that the inspector visit the site
before there is any activity to see the natural landscape, drainage and sensitive features. Notes and
pictures should be taken to document the pre -construction site condition and establish an environmental
baseline for future reference.
The following minimum frequency of inspection is recommended unless otherwise specified in site
permits and approvals:
• On a weekly basis during active construction;
• Before and after significant* rainfall events;
• After significant snowmelt events;
• After any extreme weather (e.g. windstorms) which could result in damage to ESC measures;
• Daily during extended rain or snowmelt periods;
• Monthly during inactive periods (> 30 days);
Toronto and Region Conservation Authority Page 73
Erosion and Sediment Control Guide for Urban Construction
• During or immediately following any spill event (see Section 7.7 for appropriate spill response
procedures);
• Before construction is shut down for the winter to ensure the site is ready for freezing conditions and
thaws; and
• At the end of construction to confirm that the site has achieved at least 80% stabilization (CSA, 2018)
and that permanent vegetation areas are well-established and effectively preventing erosion.
'A rainfall event should be considered significant when either of the following criteria are met:
• An event during which z 15 mm have been received within 24 hours; or
• An event with an intensity of z 5mm/hr and during which at least 10 mm have been received.
Occasional inspections during rainfall or melt events are encouraged, particularly in areas where there
are recurring problems. Visiting during wet weather can provide the inspector with a good understanding
of how water is moving through the site and why ESC measures may be failing.
Refer to Appendix B for BMP -specific installation, inspection and maintenance guidance.
10.1.3 Inspection documentation and reporting
Maintaining up-to-date documentation on inspection activities is an essential component of effective ESC
and the demonstration of due diligence. Documentation and reporting methods may be electronic, paper-
based, or a combination of both. Electronic web -based reporting allows the inspector to complete an
electronic inspection report on site and then save it, or upload it to a cloud -based storage platform. The
advantage of cloud -based storage of inspection reports is that it provides a central location where files
can be accessed online by all project team members. Moving toward electronic reporting is encouraged,
as it facilitates timely communication of inspection outcomes to the appropriate project team members
and governing agencies.
Inspection reports can become legal documents for a project site, as such it is recommended that they be
kept by the landowner for at least 3 years after the end of construction. During construction, paper
documentation should be kept on site, typically in the construction trailer, in addition to any electronic
storage.
Regardless of whether reports are electronic or paper, the following elements form the basis of a
thorough documentation system:
• Logbooks of completed inspection reports
• Notes on maintenance and repairs
• Date-stamped photographs from every inspection
• Any additional field notes and/or sketches necessary to best convey the inspector's observations and
recommendations
• Dated records of any relevant conversations with project team members, including onsite construction
staff.
Toronto and Region Conservation Authority Page 74
Erosion and Sediment Control Guide for Urban Construction
Inspection report formats and recipients should be discussed with the project team prior to starting the
inspection program. It is important that the inspector understand and establish a protocol for on-site
contacts, inspection report circulation, regulatory agency communication and the roles and
responsibilities of all parties involved.
The following information should be included in all inspection reports, regardless of format or layout:
• Date and time of inspection
• Inspector's name
• Site location information
• List of inspection report recipients
• Reason for the inspection (e.g. routine weekly, pre -rainfall, post -rainfall)
• A brief description of weather conditions during the inspection, during the 24 hours prior to the
inspection, and forecasted for the next few days.
• A brief description of the activities occurring on site (e.g. servicing, building construction)
• Map or drawing with notes to identify the specific areas of the site that are discussed in the report
• Descriptions (with pictures) of areas that have been repaired since the last inspection report
• Descriptions (with pictures) of newly identified ESC deficiencies and recommended repairs or
maintenance
• Descriptions (with pictures) of recurring ESC deficiencies, recommended repairs or maintenance, and
the amount of time that has passed since the deficiency was first reported.
• Any turbidity or suspended solids monitoring data collected since the last report or, if more
appropriate, a summary of the data.
An inspection report template and an example of a completed inspection report are provided for reference
in Appendix F.
10. 1.4 On -Site Reference Tools
Keeping key documents on site in the construction trailer is an important way to ensure any project team
member can easily find up-to-date information in a central location. It is recommended that the inspector
prepare a location in the trailer for storage of hardcopies of completed inspection reports, which will allow
for easy access by the project team or governing agency representatives.
Toronto and Region Conservation Authority Page 75
Erosion and Sediment Control Guide for Urban Construction
10.2 ESC Performance Monitoring
Beyond the routine inspection and repair of individual ESC measures, it
is important to evaluate the cumulative effectiveness of all the controls
installed on a construction site. This is best achieved by monitoring the
quality of site discharges or the quality of the receiving water system
downstream of the site.
On construction sites, total suspended sediment concentration (TSS) is
the parameter typically measured to assess ESC effectiveness, but
testing for other parameters may be advisable on sites where specific
water quality concerns exist. In practice, water turbidity is often
measured and used as a proxy for TSS, since turbidity can be
measured onsite in real time with handheld or online (in -water)
nephelometers (Figure 10.1). For this reason, and because duration of
exposure to elevated turbidity is also a key factor in assessing aquatic
impacts, the receiving water and effluent targets set out in this
guide (section 10.2.2) are turbidity targets.
Table 10.1 summarizes the advantages and disadvantages of different Figure 10.1: An in -water
approaches to turbidity monitoring on construction sites. Understanding turbidity monitoring station.
these will help practitioners select the most appropriate option(s) based on project -specific circumstances.
Turbidity vs. Total Suspended Solids (TSS) concentration
The turbidity of a liquid is a measure of its transparency -the degree to which light is scattered by substances
that are dissolved or suspended within it. While elevated water turbidity can be caused by the presence of
suspended sediment particles (e.g. silt and clay), it can also be attributed to dissolved organic matter, algae,
microscopic organisms, and any other dissolved or suspended substance that affects the transmission of light
through the water. When measured by a nephelometer in Nephelometric Turbidity Units (NTUs), turbidity is the
intensity of scattered light detected at 90° from the incident light passing through a water sample.
TSS concentration differs from turbidity in that it is a measure of the amount of solids (both organic and
inorganic) suspended in water. It is usually measured as a weight (milligrams) per unit volume (litre). While
turbidity and TSS concentration are positively correlated, the relationship between them is not direct and will
vary from site to site. Despite this, turbidity is often accepted as a satisfactory proxy for TSS concentration, since
turbidity can be measured onsite in real time by handheld or online nephelometers (i.e. turbidimeters) while TSS
concentration must be determined through laboratory analysis.
For frequent or continuous monitoring of water
quality on construction sites, turbidity is a useful
metric, allowing for quick onsite assessment and
identification of potential problems with excess
sediment release. Studying fluctuations in turbidity
readings over time can help to identify areas of
potential contamination. When there is a need for
a more absolute and accurate assessment of the
amount of suspended sediment in the water, it must
be sampled and submitted for laboratory analysis.
Toronto and Region Conservation Authority Page 76
Erosion and Sediment Control Guide for Urban Construction
Table 10.1: Advantages and disadvantages of different approaches to turbidity monitoring on construction sites.
Handheld
turbidity
measurement of
grab samples
Continuous
online turbidity
measurement
Continuous
online turbidity
measurement
with remote
real-time
access to data
• Straightforward
site • Low equipment cost
discharge • Direct measurement of site runoff = greater accountability
points • Problem areas can be pinpointed
• Can be carried out even in the winter
• Staff costs for sampling
• Limited to locations where grab sampling is possible
• Potential for error due to poor sampling technique
• Duration is not assessed
Receiving
• Low equipment cost
• Need to determine pre -construction background turbidity
water D/s and
• More readily comparable to existing CWQG for aquatic life
. Staff cost for sampling
U/s of site
• Can be carried out even in the winter
• Equipment costs may be higher
Outlet of
• Concentration & duration = more accurate assessment
' Site visits required to retrieve data — delays problem response
sediment
• Convenience - data logged at all times of day and night
' Only pond effluent is assessed
control pond
• Set location means higher precision and comparability
' Not operational during winter
• Challenges associated with equipment maintenance and
calibration to avoid false exceedances
• Concentration & duration = more accurate assessment
' Equipment costs may be higher
Receiving
Convenience -data logged at all times of day and night
• Site visits required to retrieve data — delays problem response
water D/s and
Set location means higher precision and comparability
. Not operational during winter
U/s of site
• Readily comparable to existing CWQG for aquatic life
. Challenges associated with equipment maintenance and
calibration to avoid false exceedances
Outlet of • In addition to those listed above:
sediment • Convenience of remote access
control pond • Opportunity for faster problem response
Receiving • In addition to those listed above:
water and • Convenience of remote access
site
U/s of site Opportunity for faster problem response
mdfthmlm� sp
• Additional cost for remote access, which may be offset by
reduced staff costs for site visits
• Only pond effluent is assessed
• Not operational during winter
• Challenges associated with equipment maintenance and
calibration to avoid false exceedances
• Additional cost for remote access, which may be offset by
reduced staff costs for site visits
• Not operational during winter
• Challenges associated with equipment maintenance and
calibration to avoid false exceedances
CWQG: Canadian Water Quality Guideline for Aquatic Life. D/s: downstream, LI/s: upstream
Toronto and Region Conservation Authority Page 77
Erosion and Sediment Control Guide for Urban Construction
10.2.1 Site specific turbidity monitoring protocols
The extent of turbidity monitoring and methods used on a
given construction project should be based on
consideration of the following site specific factors:
• Erosion risk. Determined based on site characteristics
(e.g. slopes, soil type) and the work planned (extent of
disturbance, project duration). This should be
determined for all projects prior to the initiation of any
work, as described in Chapter 6.0.
Receiving water flows. Because online turbidity
sensors typically need to be kept submerged in order to
work effectively, consider whether the site discharges to
a perennially flowing water feature and whether the low Figure 10.2: Redside dace, a species at
water level is deep enough to keep the sensor risk in Ontario
submerged. The type of receiver should also be
considered — whether natural feature or municipal sewer system — as different water quality thresholds
and monitoring requirements may apply.
Presence of species at risk. As detailed in Silt Smart - Erosion and Sediment Control Effectiveness
Monitoring and Rapid Response Protocol for High Risk Construction Projects version 1.3 (MNRF et al.,
2012). The Protocol defines sensitive streams as those which are known or potential habitat for
species at risk in Ontario — as listed in Ontario Regulation 230/08 — as well as those serving as
spawning or nursery habitat for coldwater species. Sensitive streams are identified in the Protocol as
requiring more intensive turbidity monitoring. Specific monitoring requirements for construction sites
draining to sensitive streams are established by MECP and DFO, as they administer species at risk
legislation at the provincial and federal level, respectively.
• Type and location of discharge points. The location where site effluent is discharged into the
receiving water system can sometimes dictate whether suitable in -water turbidity monitoring stations
can be established. On sites that are not accessible by monitoring staff or where there are safety
concerns, effluent monitoring may be the only option. Conversely, effluent monitoring in which online
turbidity sensors are installed at pond outlets could be cost prohibitive on sites with several ponds. In
these cases receiving water turbidity monitoring upstream and downstream of the site, where possible,
may be more cost-effective.
On projects where turbidity monitoring will be limited to handheld turbidity measurement of grab samples,
sampling should be undertaken during any activities or events that result in discharges of water from the
site. In addition to rainfall events, this should include thaw events and any pumping and dewatering
activities that result in discharges to the receiving water feature.
10.2.2 Turbidity targets for construction runoff and downstream receivers
When evaluating turbidity levels in construction site runoff or downstream receiving water systems, it's
important to first establish the target turbidity or TSS concentration that will prevent adverse impacts to
receiving water ecosystems. This section outlines targets that support a performance based approach to
the assessment of ESC measures. In a performance based approach, the cumulative effectiveness of
Toronto and Region Conservation Authority Page 78
Erosion and Sediment Control Guide for Urban Construction
the ESC plan is assessed by evaluating whether water leaving the site meets set turbidity targets, and
there is less focus on individual controls.
The 'Total Particulate Matter' guideline within the Canadian Water Quality Guidelines (CWQG) for the
Protection of Aquatic Life (CCME, 2002) is one of the primary guidance documents that detail target
suspended sediment concentrations for preventing impacts to aquatic organisms. The CWQG for total
particulate matter provides maximum allowable increases in TSS concentration above the receiving
water's background concentration, and provides separate thresholds for dry weather (clear flow) and wet
weather (high flow) conditions.
The Guidelines include thresholds for both TSS concentration and the duration of exposure to that
concentration, as do other key research studies that are often cited when considering the impacts of
sediment on aquatic ecosystems. One such study is Newcombe (1986), which puts forth a fisheries
impact framework which is depicted in a modified form in Figure 10.3.
Zone 2
MINOR IMPACT
Per event
Behavioural changes
Zone 1
FEW ILL EFFECTS
Per event
Duration of exposure (hr)
— — 25 mg/L
10000
Figure 10.3: Impacts to fish and habitat health based on TSS concentration and the duration of exposure
(modified from Newcombe, 1966)
Toronto and Region Conservation Authority Page 79
Zone 4
MAJORIMPACT
Perevent
X34
Changes to populations of fishes and
other organisms, harm to habitat and
death of fishes and fish eggs
MODERATE
IMPACT
Per event
Sublethal changes to
physiology, growth
rate and tissues
Zone 2
MINOR IMPACT
Per event
Behavioural changes
Zone 1
FEW ILL EFFECTS
Per event
Duration of exposure (hr)
— — 25 mg/L
10000
Figure 10.3: Impacts to fish and habitat health based on TSS concentration and the duration of exposure
(modified from Newcombe, 1966)
Toronto and Region Conservation Authority Page 79
Erosion and Sediment Control Guide for Urban Construction
Receiving water target
A receiving water target applies downstream of the construction site, in the water body to which the site
drains. The framework described in this section has been established to define turbidity targets for
receiving water systems downstream of construction sites based on the CWQG, the fisheries impact
framework in Newcombe (1986), and past construction site monitoring in the Greater Toronto Area
(TRCA and University of Guelph, 2006). It is based on an assumed TSS to turbidity correlation of 1:1.
While TSS -turbidity correlations can vary greatly from one site to another, a 1:1 correlation approximates
that which has been observed during instream turbidity monitoring downstream of a construction site in
Markham, Ontario (TRCA and University of Guelph, 2006) and monitoring of effluent from a flow
balancing system that treated stormwater runoff and combined sewer overflows at the Lake Ontario
shoreline in Scarborough, Ontario (SWAMP, 2005).
Figure 10.4, which mirrors the Newcombe framework in Figure 10.3, identifies four impact classification
zones based on the turbidity level and the duration of exposure. Some key thresholds to be noted are:
At turbidity concentrations <_ 25 NTU there are few adverse impacts, regardless of duration
At turbidity concentrations of >_ 1000 NTU, even short exposures (< 1 hr) result in moderate impacts
The turbidity target for receiving water systems downstream of construction sites is to maintain
turbidity levels within the "few ill effects" or "minor impact" zones of Figure 10.4. Assessment is
based not only on the turbidity level but also on the associated duration of exposure to that turbidity.
Exceedance of the target should be determined by the extent of increase above typical (pre -
construction) turbidity levels in the stream in order to ensure that construction projects are not
held accountable for natural sediment fluctuations.
The equation of the line dividing the "minor impact" zone from "moderate impact" zone is:
t = 324.1 x 4-1.232
Where t = turbidity (in NTU) and d = duration (in hours)
Toronto and Region Conservation Authority Page 80
Erosion and Sediment Control Guide for Urban Construction
1000000
0.1 1 10 100 1000 10000
Duration of Exposure (hr)
Figure 10.4: Receiving water ecosystem impact classification zones based on turbidity and the duration
of exposure (modified from Newcombe, 1986).
In order to assess the extent of compliance with this target, continuous turbidity and duration data must
be available. With this data and the equation of the minor -moderate impact dividing line, it is possible to
continuously assess whether the receiving water exceeds the target. Table 10.2 provides turbidity and
associated duration thresholds that define the target zones (few ill effects or minor impact). These values
have been calculated using the equation of the line defined above (t = 324.1 x d-' 232).
Table 10.2: Maximum allowable construction -based turbidity increases in the receiving water system at
different durations
5 25
Any duration
----------- --..__._
_._._.....--------------------------------------------------------------------------------------------
324
1
100000
......-
-
_---------------------
3
------------------------------
- ------------------------ --------------------
4
45
----........_...
36
. ----- ----- ------ - --
Zone 4 .-
29
7
_.__.___
_- ._-
- ___. MAJOR - -- -_
F_
10000
IMPACT -
?
Zone 3
Per Event
Z�
MODERATE
'O
IMPACT
.-
1000
-
Per Event
_
Zone 2
r\`
MINOR
3247
100
IMPACT
Per Event
1
25 NTU
10Zone
1 -
_-
[- ___ --
€-
FEW ILL EFFECTS
--
If - -- --- -
Per Event --
0.1 1 10 100 1000 10000
Duration of Exposure (hr)
Figure 10.4: Receiving water ecosystem impact classification zones based on turbidity and the duration
of exposure (modified from Newcombe, 1986).
In order to assess the extent of compliance with this target, continuous turbidity and duration data must
be available. With this data and the equation of the minor -moderate impact dividing line, it is possible to
continuously assess whether the receiving water exceeds the target. Table 10.2 provides turbidity and
associated duration thresholds that define the target zones (few ill effects or minor impact). These values
have been calculated using the equation of the line defined above (t = 324.1 x d-' 232).
Table 10.2: Maximum allowable construction -based turbidity increases in the receiving water system at
different durations
5 25
Any duration
761
0.5
324
1
138
2
84
3
59
4
45
5
36
6
29
7
Toronto and Region Conservation Authority Page 81
Erosion and Sediment Control Guide for Urban Construction
Continuous monitoring for assessing compliance with receiving water target
For sites where a receiving water turbidity target is most appropriate (see considerations in section
10.2.1), assessing compliance, including consideration of duration, requires continuous monitoring in the
receiving water system immediately upstream and downstream of the construction site. The monitoring
program for sites applying the receiving water target should include the following components:
• One continuous online (in water) turbidity monitoring station downstream of the site. The
downstream station should be situated 5 to 15 m downstream of the last site discharge point. The
location should be selected based on allowing enough distance for dispersion of the effluent into the
stream, but not so much distance that additional sediment sources begin to impact receiver turbidity.
• At least one continuous online (in water) turbidity monitoring station upstream of the site. The
upstream station is used to isolate and account for sediment contributions that are naturally occurring
or which are coming from a sediment source upstream of the site. It represents typical (pre -
construction) turbidity levels against which downstream levels are compared to determine compliance
with targets. The upstream station should be located as close to the site as possible. If there are any
flow contributions between the upstream and downstream stations (e.g. stream confluence, outfall
from another site) which are not originating from the construction site, the other contribution should
also be quantified. For stream confluences, an additional turbidity monitoring station should be set up,
just downstream of the confluence but upstream of the next construction site discharge point.
Upstream '
station Pond 1
Pond 1
discharge Construction ,
,
Pond 2
discharge
Downstream
. station
Figure 10.5: Turbidity monitoring station locations relative to
points
Toronto and Region Conservation Authority Page 82
Erosion and Sediment Control Guide for Urban Construction
Each turbidity monitoring station equipped
with: (i) a turbidimeter (a sonde with a
turbidity sensor), (ii) a data logger, (iii) power
supply (e.g. batteries, solar panels), and (iv)
an enclosure to protect equipment. On sites
where rapid response to address elevated
turbidity levels is required (e.g. species at risk
sites), monitoring stations should also be installed
with telemetry equipment to allow remote data
access. All equipment should be maintained and
calibrated regularly in accordance with the
manufacturer's recommendations.
• Continuous turbidity monitoring throughout
the construction period until the site achieves
at least 80% effective permanent stabilization.
This is the threshold after which ESC inspections
are no longer required, as described in the CSA
ESC Inspection and Monitoring Standard (CSA,
2018). If otherwise specified by the overseeing
regulatory agency and/or if turbidity issues are
demonstrated to be an ongoing concern, despite
reaching this threshold, monitoring may be
required to continue.
• Collection of data from a nearby rain gauge.
Precipitation data from a rain gauge no further
than 5 km from the site will facilitate the
interpretation of turbidity exceedances. Where
real time systems are in place, rain data should
also be available in real time. If not available from
an existing nearby gauge, a new telemetered
gauge should be established on site. If observed
exceedances of turbidity targets are not occurring
as a resuit of wet weather, active water
discharges (e.g. pumping) should be considered as the potential cause of elevated turbidity.
Data analysis software / tool. Analyzing and interpreting continuous turbidity data to assess
compliance with the target requires the establishment of appropriate data management software
and/or tools. The tools used may be relatively simple, like a spreadsheet set up with the relevant
formulas, or more sophisticated, like a specialized application developed for interpretation of this type
of data. Ideally, these systems should be set up to filter data such that false exceedances (e.g.
passing debris) are excluded from consideration. Where real time systems are in place, the tool
should also interpret the data in real time. It should be capable of processing and interpreting turbidity
and duration data on a continuous basis to determine compliance with targets and push that
information out to the pre -determined recipients (e.g. ESC inspector).
Grab sampling when continuous monitoring is infeasible. During site conditions when continuous
in -stream monitoring is not possible (e.g. frozen conditions), turbidity should still be monitored during
Toronto and Region Conservation Authority Page 83
Erosion and Sediment Control Guide for Urban Construction
rainfall and snowmelt events by collecting grab samples and testing with a handheld device. In this
case, receiving water and/or effluent samples may be appropriate depending on stream and site
conditions, what activities are occurring on the site, and where high turbidity runoff is observed during
inspections.
Example: Assessing compliance with the receiving water target
In order to assess the turbidity increase attributable to the construction site, it is necessary to account for
typical (pre -construction) turbidity levels as well as turbidity increases from upstream activities. The
following calculation can be carried out to isolate the construction -based turbidity increase:
Construction based turbidity increase = (measured DS turbidity) — (measured US turbidity)
Where:
DS = downstream station
US = upstream station
To illustrate the application of this equation for assessing compliance, the following sample calculation is
provided:
Assuming:
Measured US turbidity = 50 NTU
Measured DS turbidity = 200 NTU
Then:
Construction based turbidity increase = (200 NTU - 50 NTU) = 150 NTU
Once this is determined, the turbidity -duration chart can be referenced to determine the duration at which
this turbidity increase would constitute an exceedance of the target (i.e. enter the "moderate impact'
zone). This method is demonstrated in Figure 10.6, which shows that if the construction site is causing a
turbidity increase of 150 NTU from the upstream to the downstream stations, the duration of this elevated
turbidity should be no longer than 1.85 hours (1 hr and 52 min). If it occurs for longer, the receiving water
system is in the "moderate impact' zone and the site is not in compliance with the turbidity target. If this
occurs, the reasons for the exceedance should be investigated on site. Once sediment sources are
pinpointed, modifications, replacements, repairs and / or maintenance should be carried out on site as
needed to prevent ongoing sediment releases.
Toronto and Region Conservation Authority Page 84
Erosion and Sediment Control Guide for Urban Construction
Figure 10.6: Example of the use of interpolation to determine the maximum allowable duration of a
construction based turbidity increase of 150 NTLI in a receiving water system.
Construction effluent target
A construction effluent target applies to any direct runoff/discharge from the construction site, before
it is subject to any dilution in a receiving water system This includes both active and passive
discharge. Measurement of effluent quality provides a very direct assessment of construction sediment
releases and can facilitate the identification of specific problem areas on the site. It also makes it possible
to conclusively identify instances when the construction site is not the source of elevated sediment levels
in downstream receiving water systems, provided that all site effluent is being monitored.
Turbidity targets for construction effluent are also based on the framework shown in Figure 10.4. Like the
receiving water target, the effluent target is based on the assumption that there is a 1:1 correlation
between TSS and turbidity. The target is applicable where it is not superseded by other site-specific
regulatory requirement governing discharges from the construction site (e.g. contaminant thresholds in
sewer use by laws
The turbidity target for construction site effluent is to maintain turbidity levels within the "few ill
effects" or "minor impact' zones of Figure 10.4. It differs from the receiving water target in that the
typical (pre -construction) turbidity in the receiving system is not considered. The turbidity of the effluent
itself (and the duration over which it occurs), should fall within the "few ill effects" or "minor impact" zones.
Toronto and Region Conservation Authority Page 85
Erosion and Sediment Control Guide for Urban Construction
The equation of the line dividing the "minor impact" zone from "moderate impact' zone is:
t = 324.1 X d-1.232
Where t = turbidity (in NTU) and d = duration (in hours)
Table 10.3 provides turbidity and associated duration thresholds that define the target zones. These
values have been calculated using the equation of the line defined above (t = 324.1 x d-1.232).
Table 10.3: Maximum allowable construction effluent turbidity at different durations
5 25
Any duration
761
0.5
324
1
138
2
84
3
59
4
45
5
36
6
29
7
Continuous monitoring for assessing compliance with construction effluent target
For sites where an effluent turbidity target is most appropriate (see considerations in section 10.2.1),
assessing compliance, including consideration of duration, requires continuous monitoring of effluent at
any discharge locations where the sensor can remain permanently submerged. During a rainfall event,
effluent from any site discharge locations can be sampled and subsequently analysed, but continuous
online turbidity sensors can only be installed where they can be permanently submerged (e.g. in a
sediment control pond). In ponds, a turbidity sensor is typically installed at the outlet if it is meant to
measure effluent.
The monitoring program for sites applying the effluent target should include the following components:
Continuous online (in water) turbidity monitoring stations at all permanently wet discharge
locations. In most cases, these locations will be sediment control pond outlets. On sites where there
are many ponds and establishing stations at all of them is impractical, priority should be given to
monitoring of ponds that receive runoff from drainage areas that are larger and/or more vulnerable to
erosion (i.e. minimal stabilization measures are in place).
• Each turbidity monitoring station equipped with: (i) a turbidimeter (a sonde with a turbidity
sensor), (ii) a data logger, (iii) power supply (e.g. batteries, solar panels), and (iv) an enclosure
Toronto and Region Conservation Authority Page 86
Erosion and Sediment Control Guide for Urban Construction
to protect equipment. On sites where rapid response to address elevated turbidity levels is required
(e.g. species at risk sites), monitoring stations should also be installed with telemetry equipment to
allow remote data access. All equipment should be maintained and calibrated regularly in accordance
with the manufacturer's recommendations.
• Continuous turbidity monitoring throughout the construction period until the site achieves at
least 80% effective permanent stabilization. This is the threshold after which ESC inspections are
no longer required, as described in the CSA ESC Inspection and Monitoring Standard (CSA, 2018). If
otherwise specified by the overseeing regulatory agency and/or if turbidity issues are demonstrated to
be an ongoing concern, despite reaching this threshold, monitoring may be required to continue.
• Collection of data from a nearby rain gauge. Precipitation data from a rain gauge no further than 5
km from the site will facilitate the interpretation of turbidity exceedances. Where real time systems are
in place, rain data should also be available in real time. If not available from an existing nearby gauge,
a new telemetered gauge should be established on site. If observed exceedances of turbidity targets
are not occurring as a result of wet weather, active water discharges (e.g. pumping) should be
considered as the potential cause of elevated turbidity.
• Data analysis software I tool. Analyzing and interpreting continuous turbidity data to assess
compliance with the target requires the establishment of appropriate data management software
and/or tools. The tools used may be relatively simple, like a spreadsheet set up with the relevant
formulas, or more sophisticated, like a specialized application developed for interpretation of this type
of data. Ideally, these systems should be set up to filter data such that false exceedances (e.g.
passing debris) are excluded from consideration. Where real time systems are in place, the tool
should also interpret the data in real time. It should be capable of processing and interpreting turbidity
and duration data on a continuous basis to determine compliance with targets and push that
information out to the pre -determined recipients (e.g. ESC inspector).
• Grab sampling when continuous monitoring is infeasible. During site conditions when continuous
in -stream monitoring is not possible (e.g. frozen conditions), turbidity should still be monitored during
rainfall and snowmelt events by collecting grab samples and testing with a handheld device. In this
case, receiving water and/or effluent samples may be appropriate depending on stream and site
conditions, what activities are occurring on the site, and where high turbidity runoff is observed during
inspections.
10.2.3 Response protocols for turbidity exceedances
Protocols for responding to and reporting turbidity exceedances should be established on all sites where
effluent or receiving water turbidity is being continuously monitored. The protocol should outline the
parties to be contacted when an exceedance occurs, including the project team members and relevant
regulatory agencies, and identify necessary actions and when they should be undertaken. When an
exceedance occurs, preliminary investigations should take place to confirm whether the exceedance is
valid (e.g. not simply a result of passing debris) and whether the construction site itself is the source of
elevated turbidity measurements.
The following actions are recommended when continuous monitoring reveals that construction site
effluent (or the downstream receiving water system) has reached a turbidity level that is in the "moderate
impact" zone (Figure 10.4):
Toronto and Region Conservation Authority Page 87
Erosion and Sediment Control Guide for Urban Construction
Parties to be notified
• ESC inspector
• Contract administrator
• Contractor (once corrective actions are determined
• Overseeing regulatory agencies as defined by permits / approvals (if applicable)
Actions and reporting
Upon confirmation of the exceedance, and no later than 10 hours after the exceedance began (or 10
hours after first light if the exceedance occurs at night), a preliminary notification should be sent out to
relevant parties. The preliminary notification should include the following information:
• Date and time of inspection
• Inspector's name
• Site location information
• List of report recipients
• Timing, location, magnitude and duration of turbidity exceedance
• Any information about suspected source of sediment
• If known, describe the repairs, maintenance and/or modifications of ESC measures planned in order to
address the elevated sediment releases causing turbidity exceedances.
• If known, estimated timing for the completion of repairs, maintenance and/or modifications.
In the case that turbidity exceedances continue despite initial efforts to rectify ESC deficiencies, update
reports should be sent to the listed parties daily until turbidity falls back below the applicable target.
Depending on the site, the nature of the construction work, the magnitude and duration of the
exceedance, and any relevant approval or permit conditions, stop work orders and other consequences
may apply to ongoing exceedances that are not rectified in a timely manner.
All update and final reports - should include the following information:
Reason for the inspection (e.g. routine weekly, pre -rainfall, post -rainfall)
• A brief description of weather conditions during the inspection, during the 24 hours prior to the
inspection, and forecasted for the next few days.
• Map or drawing with notes to identify the specific areas of the site that are discussed in the report
Beyond this basic information the following should be included in specific types of reports:
Update report
• Provide information on the timing, location, magnitude and duration of the continued exceedance
• Explain the status and outcome of the planned remedial actions described in the preliminary
assessment report, including why they failed to reduce turbidity back below the target.
• Provide a timeline and recommendations on strategies for reducing effluent turbidity and getting the
receiving water turbidity back below the applicable target.
Toronto and Region Conservation Authority Page 88
Erosion and Sediment Control Guide for Urban Construction
Final assessment report
• Provide a summary of the exceedance that occurred, including location, the total duration and range of
turbidities measured.
• Explain the deficiencies that resulted in the turbidity exceedance and how they were addressed.
• Describe the actions taken to mitigate future turbidity exceedances.
10.3 BMP Maintenance
Carrying out maintenance of ESC BMPs in a
timely manner is an important way to
demonstrate due diligence on construction
projects. For temporary ESC measures,
maintenance and repair should continue until the
measure is no longer needed. Some measures
will require more regular maintenance (e.g.
removal of accumulated sediment), while others
may only require periodic maintenance when
accumulated sediment levels reach a certain
threshold (e.g. sediment control ponds). BMP -
specific maintenance requirements are provided
in Appendix B.
Repairs, maintenance or replacement of BMPs Figure 10.7: Maintenance of rock check dams
should be conducted as soon as possible upon issuance of an inspection, and the inspector should
specify the priority level of maintenance needs based on the risk of impacts to natural features. In order
to expedite maintenance activities, back up supplies of frequently replaced ESC materials should be kept
on site where possible.
In general, BMPs requiring maintenance should be repaired / cleaned within 48 hours of notification or
sooner if environmental receptors are at imminent and foreseeable risk of adverse impact. In the event of
a spill, as detailed in section 7.7, immediate response is required.
A sample inspection report, provided in Appendix F, demonstrates the appropriate way to document the
need for maintenance. This includes photos, location identification, description of maintenance needs,
and details on how long the area in question has been in disrepair.
Toronto and Region Conservation Authority Page 89
APPENDIX A: SPECIFIED FLOOD RISK
CALCULATION
Specified flood risk calculation for sizing in water BMPs
The concept of specified flood risk is useful in determining the sizing of some BMPs that are
temporary in nature, as it considers the accepted level of risk or BMP failure and its intended service
life.
The Ministry of Natural Resources and Forestry recommends that sizing of certain BMPs applied
during in or near water works, like cofferdams and temporary watercourse diversion channels,
should be calculated based on consideration of the specified flood risk, as described in Hydrology
of Floods in Canada: A Guide to Planning and Design (National Research Council of Canada, 1989).
The design return period (T) which the BMP should be sized to accommodate is based on the
anticipated service life of the BMP (L) in units of years and the specified risk (R), which is unitless.
As per the National Research Council of Canada guide (1989), the level of risk commonly applied
when sizing a temporary watercourse diversion or cofferdam is 0.05 to 0.1 (i.e. between 5 and 10
percent).
The equation for determining the design return period is:
i
T=1 L1 a
Example: Calculation of design return period (T) of water surface elevation where a cofferdam
should be designed that has service life (L) of 75 days (0.21 year) and specified risk (R) of 0.05.
1
T= 1_0.x7 i-o.os
The return period (T) is - 5 years.
A return period of 2 years should be assumed if the calculated return period is less than 2
years. In -water BMPs should not be sized to convey less than the 2 year flows unless
approved by the relevant regulatory agency.
Calculation of return period for in -water BMPs (e.g. waterproof isolation barriers) should be
based on a maximum risk of 5%. Once the return period is calculated, rainfall depths can be
determined and, based on the drainage area, the maximum flow rate to be accommodated can be
determined. In calculating maximum flow rates, the drainage area imperviousness (runoff coefficient)
applied should be based on the anticipated site conditions during the service life of the BMP. If
drainage area imperviousness is expected to increase during the service life of the BMP, the higher
imperviousness (highest expected runoff coefficient) should be assumed in the calculation.
This type of calculation can also be applied to aid in the proper sizing of other conveyance BMPs on
construction projects (e.g. slope drains), particularly if the BMP conveys water into a natural feature.
In these instances, the specified risk (R) value chosen should be based on potential consequences if
the measure was to fail / overtop. For example, a slope drain on a steep and / or long slope that
drains to a sensitive feature should be designed based on a low specified risk (e.g. R= 0.05), since
its failure could result in major slope erosion and sedimentation in the downstream sensitive area.
/_Wa=1ZIQ0:31;I:ZeL If] ZI_1ZI11&140I►Yil4ilk II
CONTROL BEST MANAGEMENT
PRACTICES
Erosion and Sediment Control Guide for Urban Construction
131: EROSION CONTROL PRACTICES
Preventing erosion is the most effective means of keeping sediment onsite during construction projects. Practices
that reduce erosion rates include strategies to minimize the amount of land cleared, diversion of flows around high
erosion risk areas, and the application of ground covers that stabilize soil and/or provide a physical barrier to soil
particle detachment.
Detailed guidance on the following erosion control practices are included in Appendix 131:
,.
IL 0
Minimized or phased land clearing
61-2
Vegetated filter strips
61-5
Slope drains
61-5
Interceptor swales
61-9
Surface roughening
B1-12
Mulching
B1-14
Seeding
B1-17
Outlet protection
B1-22
Rolled erosion control products
B1-25
Chemical stabilization
B1-29
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-1
Erosion and Sediment Control Guide for Urban Construction
MINIMIZED OR PHASED LAND CLEARING
The preservation of vegetated areas on active construction sites is a
practice that offers several advantages from an erosion control and
runoff management perspective. The topsoil, vegetation and root
systems that are part of pre-existing vegetated areas make them
effective at intercepting and infiltrating rainfall and keeping soil in
place.
Minimizing clearing involves the identification of site areas where
vegetation can be preserved throughout the entire construction
period. Areas cleared are smaller and more manageable with
respect to control erosion and sediment migration. Phased clearing,
Figure B1-1: Buffer of vegetation
by contrast, does not completely avoid stripping but instead requires retained at site perimeter
strategic planning to schedule clearing, development and re -
stabilization of the site so that the total amount of time that bare soils are left exposed is minimized as much as
possible. When development is phased, only a portion of the site is stripped and developed at any given time, and
the next parcel/phase is only initiated once the earlier phase is complete, including re -stabilization.
Application
• Parcels designated for later development (e.g. school blocks, parks).
• Any areas of a site where construction activity is not planned for an
extended period of time. On stripped areas that are inactive for 30
days or longer, stabilization measures should be applied.
• Phasing is most appropriate for larger sites (>10 ha), where it is more
feasible to divide the development into smaller phases.
• It is particularly import to retain a buffer of vegetation along the site
perimeter and around natural features.
Design
• Consider minimizing stripping first. Early in the planning process, identify areas where vegetation can be
retained. Where minimized clearing can be planned and executed efficiently, it can be more cost-effective
than stripping vegetation that must later be re-established.
• The maximum amount of land stripped at a given time should be limited
by the area that can reasonably be expected to be developed and
stabilized within the same construction season (before freezing conditions
set in).
• Identify any areas that will be inactive in the long term (longer than one
construction season) for designation as vegetation preservation areas.
• Avoid using vegetation preservation areas for soil stockpiling. If these
areas are used for stockpiles or other materials storage, their erosion
control and infiltration benefits cannot be fully realized.
• Vegetated buffers, as established in the approved draft plan of subdivision
or site plan for the subject property, should be preserved around the site
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-2
Erosion and Sediment Control Guide for Urban Construction
perimeter and adjacent to natural features. For specific requirements on buffers around natural features and
hazards, consult with the local regulatory agency (i.e. municipality, CA). Recommended buffers applicable
within the TRCA jurisdiction are detailed in The Living City Policies for Planning and Development in the
Watersheds of the Toronto and Region Conservation Authority (TRCA, 2014), and within the CVC jurisdiction
in Credit Valley Conservation Watershed Planning and Regulation Policies (CVC, 2010).
• Preserved areas should be fenced off to provide protection from vehicle tracking.
• Plans should identify trees and shrubs that have been designated for protection. Trees should be surrounded
by sturdy tree protection fencing (Figure 61-2), which should be placed far enough from the trunk that the root
systems are also protected. Root systems can extend more than 3 times the dripline distance (City of Toronto,
2016). Local municipal policies and bylaws on tree protection should be referenced prior to creating topsoil
stripping plans in order to establish appropriate tree protection zones. A tree inventory / preservation plan may
be required for removal and preservation of species. Consultation with a qualified arborist is recommended.
• Where phasing is being implemented it should be considered at the early stages of planning and design. Co-
ordination of workplans, construction schedules and permitting/approvals timelines is key.
• Identify effective, low-cost temporary stabilization options and implement on areas that have already been
subject to stripping and earth moving, and which are expected to remain inactive for longer than 30 days.
Inspection and maintenance
• Inspect vegetation preservation areas and re -stabilized areas on a weekly basis, and before and after
significant rainfall (see definition in Section 10.1.2) or snowmelt events, and keep a record of the inspection.
Beyond this routine inspection, additional inspections of seeded areas may be needed when the seed is newly
planted as well as during periods of drought.
• Ensure vehicles and equipment are not driving over vegetation preservation areas or other areas that
have been re -vegetated.
• Inspect vegetation protection fencing to determine if maintenance is required (Figure 131-2).
• Visually evaluate the condition of vegetation preservation areas, including buffers, trees and shrubs.
• Identify any observed decline in vegetation health that could be attributable to construction activities and
recommend ESC improvements to mitigate any further harm. Common impacts to trees can include
structural damage, root cutting and soil compaction, while other vegetated areas may be subject to
erosion and/or sediment deposition due to altered site hydrology and vehicle tracking.
• If re -stabilization measures have been implemented (e.g. seeding, rolled erosion control products, mulching),
refer to the BMP specific guidance in this chapter for detailed inspection and monitoring requirements.
• Look for any evidence of erosion on vegetation preservation areas or re -stabilized areas. Where erosion
is occurring, determine whether the areas should be reinforced with additional erosion control measures
(e.g. seeding, blankets, mats), or if flows should be re-routed around the area.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact. If buffers around natural features are
compromised due to erosion or sediment deposition, their restoration should be set as a high priority,
particularly when they are failing to protect the natural area from construction activities.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-3
Erosion and Sediment Control Guide for Urban Construction
gar
y�� e
x 'a
a
,na PLYWOOD- -�� i tvZ I
I ssax FOA OeTAILS 9 1 ,
MERE .YI.EIvwaaooxtvsusEG O 1111
E1 ENE AVSWING WiNWW
CWEc E O
vvsrc wEe
t
2
' •-.^nisi at; ON
"IIVvENTgS NOVEO
BY UNISON FOFESmY
Tree Protection Barriers' $14MI'ENSINGON2..rruNNOOR
BaOVED EourvuENT
iQ Tree protection barriers must be constructed with a solid wood frame clad with plywood
or approved equivalent. Height of hoarding may be less than 8 N. to accomodate any
branches that may be lower.
OTree protection barriers for trees situated on the City road allowance where visibility must
be maintained can be 1.2m (aft.) high and consist of orange plastic web snow fencing on
a wood frame made of 2 x as.
OWhere some excavate or fill has to be temporarily located near a tree protection barrier,
plywood must be used to ensure no material enters the Tree Protection Zone.
® No construction activity, grade changes, surface treatment or excavations of any kind
is permitted within the Tree Protection Zone.
Note:
sediment control fencing shall be Installed in locations indicated in an Urban Forestry
approved Tree Protection Plan. The sediment control fencing must be Installed to
Ontario Provicial Standards (OPSD-219.130) heavy duty sift fence barrier and to
fh f�thesatisfactionnloff fUlrban Forestry. see Detail TP -2
IIJIII esOROWO Parks, Forestry and Recreation
Urban Forestry February 2016 Detail TP -1
Figure B1-2: City of Toronto tree protection barrier detail (City of Toronto, 2016)
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-4
Erosion and Sediment Control Guide for Urban Construction
VEGETATED FILTER STRIPS
(a.k.a. vegetated/vegetative buffer strips)
Vegetative filter strips are areas of vegetation that are left in-situ in order to act as temporary or permanent, low-
cost and effective erosion and sediment control measures. Well-established, existing vegetation can reduce the
velocity of surface runoff, promote infiltration and reduce discharge by capturing and holding sediment and other
pollutants.
Application
Determine areas and construction activities that may benefit from leaving
vegetation in place such as diversion swales, adjacent to buffers, and identify
the locations on the construction drawings.
Design and Installation
Vegetative buffer strips to be provided down gradient of sediment fencing
according to the following criteria:
0 3 m for perimeter fencing
0 15 m for fencing adjacent to a warm water watercourse
0 30 m for fencing adjacent to a coldwater watercourse supplemented with a second row of fencing 2 metres
beyond the initial row
• Avoidance of the area will be required in order to ensure that the vegetation is not trampled and killed.
• Climate conditions and seasonal variability may influence the effectiveness of the vegetation and additional
ESC measures may be required during times of vegetation die -back.
• Additional ESC measures upslope of the filter strips may be required if excessive sedimentation is anticipated.
• It may be necessary to delineate the vegetation to remain so that the area can be protected from excavation,
grading, foot and vehicular traffic.
• Space will be required to store equipment, vehicles, material and soil stockpiles away from areas where soil
compaction and/or vehicle tracking may damage vegetation and tree roots.
• Vegetative filter trips aren't effective at filtering high velocity flows from paved areas, steep slopes or hilly areas
without additional ESC measures.
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall (see definition in Section 10.1.2) or snowmelt events,
and keep a record of the inspection.
• Repair any damage to fencing within 48 hours and remove, by hand, and dispose of any mounds of
accumulated sediment or debris.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-5
Erosion and Sediment Control Guide for Urban Construction
SLOPE DRAIN
Slope drains are heavy duty, often flexible, pipes that convey runoff from the top
of a slope to the bottom of a slope. This runoff diversion practice is used to
prevent concentrated runoff from flowing directly over the bare face of the slope
thereby reducing erosion and, in some cases, slope failure.
Slope drains are installed with water containment or diversion structures, such
as interceptor/diversion swales, berms, or barriers that help collect and convey
upslope runoff towards the slope drain
On long slopes the installation of terraces across the slope face will also mitigate
erosion from sheet flow over the bare soil of the slope. The terraces intercept
runoff and direct them to the slope drain pipe, thereby preventing the formation
of rills and gullies on the slope.
Application
• Exposed slopes where runoff is being
conveyed from top to bottom
• Where it is anticipated that
concentrated flows will flow over the
slope face
• Particularly important on long and/or
steep slopes
• In conjunction with a multi -barrier
approach that includes water
detention and/or diversion measures.
Design and installation Figure B1-3: Slope drain
• Calculate the pipe size based on maximum flows to be conveyed in the drain and provide on ESC plan
drawings. The "Specified Flood Risk" calculation detailed in Appendix A may be applied for calculating return
periods when sizing slope drains, particularly where the drain conveys water into or close to a natural feature.
The calculation considers the acceptable level of risk (if the drain was to be overtopped) and the anticipated
service life of the swale in determining the return period. This may be useful where there is a low tolerance of
risk of failure and/or the slope drain will be in place for a long time.
• Once the return period is established, determine maximum flow volumes to be conveyed based on the size
and runoff coefficient of the contributing drainage area.
• Ensure proper securement of the pipe ex. stakes, grommets, stones, etc. and securement spacing along the
length of the slope drain.
• Ensure that pipe will extend beyond the toe of the slope to a flat area.
• Anticipate using more than one slope drain pending site drainage area and anticipated runoff flows.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-6
Erosion and Sediment Control Guide for Urban Construction
• Inlet should include a berm and inlet protection. Install the slope drain and
construct a compacted inlet berm (in 150 mm soil lifts) or barrier with a
minimum of 0.45 m compacted soil cover above the top of the pipe to secure
inlet.
• Direct the flows from the top of the slope to the proposed location of the slope
drain.
• Place slope drain(s) on undisturbed soils or compacted fill per locations on
construction drawings.
• Anchor pipes along the slope.
• Ensure erosion doesn't occur at the inlets and outlets by installing erosion mitigation pads at the inlet and
energy dissipaters at the downstream end.
• Position outlet so that it does not discharge to unprotected soils a receiving waterbody without flowing into a
multi -barrier sediment control measure.
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall (see definition in Section 10.1.2) or snowmelt events,
and keep a record of the inspection.
• Table 131-1 lists slope drain components to inspect and how common problems should be addressed.
• Inspect the length of the top of slope to ensure that runoff is being directed to the slope drain and is not flowing
down slope face.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural receptors
are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Ensure that areas receiving runoff are well -stabilized. If the final
grading will result in runoff that was conveyed through the drain
flowing over the slope, ensure that the slope is fully stabilized. If it
has been seeded, vegetated, ensure that the seed/vegetation is fully
established.
• Remove slope drains with as little disturbance of the slope as
possible.
Stabilize and restore all disturbed areas.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-7
Erosion and Sediment Control Guide for Urban Construction
Table 61-1: Recommended inspection and maintenance of slope drains
El
a.. • ,
L Maintenancelrepairs needed
Erosion and
- Consider re -grading to reduce the inflow angle.
seepage
- Repair erosion, compact soil
around the
- Stabilize inlet area with flared end section, rolled erosion control or filter fabric and riprap.
inlet
- Ensure pipe connections are watertight and that pipe is well secured.
Inlet
- Remove sediment when it begins to impede flow rates and compromise the ability of the pipe to
Sediment
convey all the water from the drainage area.
accumulation
- Sediment accumulation greater than one-third the height of the berm should be removed.
at the inlet
- Consider stabilization of drainage area where possible.
- Repair erosion, compact soil.
Erosion
- Consider incorporating outlet flow dispersion (e.g. flared pipe end) and/or energy dissipaters.
- Stabilize outlet (e.g. filter fabric and rip rap, rolled erosion control, vegetation)
Outlet
Sediment
- Remove sediment when it begins to impede flow rates and compromise the ability of the pipe to
accumulation
convey all the water from the drainage area.
at the outlet
- Consider stabilization of drainage area where possible.
Detachment
- Ensure pipe is re -secured and well -anchored to the slope.
and/or
- Consider improving anchoring methods to increase stability.
seepage
- If pipe seepage is noted, inspect pipe connections and repair/replace sections that area leaking.
- When sediment accumulation in the pipe leads to clogging and impeded flow, the pipe should be
flushed out.
Clogging
- If clogging is occurring too often, consider stabilization of drainage area and/or the installation of
Pipe
an inlet screen or grate to keep out larger debris.
- Overtopping not caused by clogging indicates that the drainage area is too large of the flow
velocity is too high for the pipe size used.
Address overtopping by reducing drainage area, increasing pipe size, or slowing flows.
Overtopping - Reducing drainage area requires re -grading and installing additional slope drains.
- Where flow velocity is the issue, consider re -grading and installation of barriers (e.g. check dams)
to slowdown runoff conveyed to the drain.
Adapted from: 'Pipe slope drains" in Storm Water Management BMP Handbook (South Carolina Dept. of Health
and Environmental Control, 2005)
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-8
Erosion and Sediment Control Guide for Urban Construction
INTERCEPTOR SWALES
(a.k.a. diversion swales, cut-off swales)
Interceptor/diversion swales are conveyance systems that intercept, collect and convey runoff away from bare soil
areas and towards sediment control measures. They may be used along or constructed with compacted earthen
dikes alongside.
The purpose of these types of swales — which may be installed on a temporary or permanent basis - is to reduce
erosion on susceptible areas by collecting and transporting runoff around a construction site in a defined and
(ideally) stabilized flow path. They also facilitate site drainage after a wet weather event, preventing storm flows
from accumulating in unwanted areas (e.g. adjacent properties, site areas where construction is underway).
Application
While interceptor swales can be an effective
erosion prevention practice for conveying runoff
through any unstabilized areas, they are
particularly important in the following
circumstances:
• When the upslope drainage area is greater
than 2 ha, and in particular in areas with
highly erodible soils.
• When the following is true:
(S2 x L) z 0.75 m
Where S is the slope of the upslope
drainage area (dimensionless), and L is
length of the upstream slope (m).
Figure 61-4: Stabilized interceptor swale
Priority areas where interceptor swales should be applied include
• Along the top of unstabilized long or steep slopes (in conjunction with slope drains).
• Along the perimeter of the site.
• Along the toe of slopes.
• Adjacent to valley and stream corridors.
• Where flows are being diverted around an area that is being stabilized/restored, in order to allow vegetation to
become established.
Design and installation
Interceptor/diversion swales and dikes are intended to convey small flows along low -gradient channels. They
should be directed towards a suitable sediment control measure, like sediment traps or sediment control
ponds.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-9
Erosion and Sediment Control Guide for Urban Construction
• Calculate the appropriate capacity of the swale and provide on ESC
plan drawings. Sizing should consider the expected service life of the
swale and potential consequences if it is overtopped.
• Calculate the gradient of the swale and provide on ESC plan
drawings. Gradient should be calculated based on the intended
capacity of the swale and the desired flow rate within the Swale. In
general, slopes should be the minimum possible that will maintain
positive drainage. Velocities greater than 1.2 m/s will erode the invert
of a grassed swale.
• Dikes/berms greater than 1 m in height should be designed by a
geotechnical engineer. The consequences of failure must be
considered. Use a multi -barrier approach if swale overtopping would result in sediment release to natural
features or other private property.
• Swales should be shaped like an inverted trapezoid, with side slopes no steeper than 2H:1 V (Figure 61-5).
Where dikes are used, they should be compacted and also constructed with side slopes no steeper than
2HA V.
• An interceptor swale should be stabilized with a suitable erosion control BMP (e.g. vegetation, RECP, stone),
particularly if it will be in place for more than 30 days. Swale inlets and outlets are important to stabilize due to
their susceptibility to erosion. Unstabilized swales contribute to suspended sediment loads in runoff being
conveyed, ultimately resulting in more sediment accumulation in downslope sediment control measures.
• In order to reduce the potential for swale erosion and provide opportunity for sediment settling, flow interruption
devices (e.g. check dams, filter socks, coir logs) should be installed within the swales. See individual flow
interruption BMPs for guidance on spacing in swale applications.
2:1Maximum
�Slope
1
Minimum 300 mm
Figure B7-5: Cross-section of recommended interceptor Swale design.
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall (see definition in Section 10.1.2) or snowmelt events,
and keep a record of the inspection.
• Look for any signs of erosion, in the swale and/or dike, particularly at the inlet and outlet.
• Where stabilization measures are already in place, fill and re -stabilize eroded areas. Consider whether
stabilization measures should be upgraded to hardier materials.
• Where erosion is observed and stabilization measures are absent or inadequate, consider adding stabilization
measures as described under "Design and installation" above.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-10
Erosion and Sediment Control Guide for Urban Construction
• Determine whether high flow rates are causing excessive erosion and if so, consider adding flow interruption
devices, reducing the size of the area draining to the swale, or re -grading the swale to a flatter slope.
• Inspect all flow interruption devices to ensure they are properly installed and functioning as intended.
Sediment and/or debris accumulation behind the device should be removed before it reaches approximately
30% of the device height.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural receptors
are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Ensure flows are re-routed appropriately prior to decommissioning of the swale, to mitigate erosion or flooding
issues.
• Fill swale, stabilize and restore the disturbed area.
• Ensure flow interruption devices are properly disposed of.
Appendix 8: Erosion and Sediment Control Best Management Practices Page 81-11
SURFACE ROUGHENING
(a.k.a. scarification)
Surface roughening of bare soil areas is a
technique that creates uneven surfaces and
depressions that minimize erosion by reducing
runoff velocities, providing greater opportunity for
infiltration, and encouraging sediment trapping.
In areas being seeded, these depressions can
also help to keep seed in place and improve the
establishment of vegetation.
Typically, surface roughening is done by tracking
equipment to create horizontal depressions that
are parallel to site contours and perpendicular to
the runoff flow path. Surface roughening
methods include: dimpling, track walking (Fig.
B1-6), stair stepping and grooving.
Application
Erosion and Sediment Control Guide for Urban Construction
Figure B1-6: Track walking applied to bare soil
• Can be applied to any inactive disturbed surface that will be left exposed on a
temporary basis (less than 30 days). Areas exposed and inactive for longer
than 30 days should be stabilized with vegetation and/or RECPs.
• Useful on exposed slopes and any other areas susceptible to erosion.
• Should be applied on any slopes steeper than 3H:1 V, where vertical height is
more than 1.5 metres.
• Useful where vegetation cannot be immediately established due to the
season.
• Effectiveness is limited on very sandy or rocky soil.
• Should only be used alone on a temporary basis.
• Most effective when used with other stabilizing practices such as mulching and seeding.
Design and Installation
• Should be applied after grading activities have ceased (temporarily or permanently) in an area.
• The selection of an appropriate method depends on slope grade, mowing requirements after vegetative
cover is established (if any), whether the slope was formed by cutting or filling, and type of equipment
available.
• Roughening tracks should be made parallel to the site contours (perpendicular to runoff flow path).
Applying tracks in the incorrect direction encourages the formation of rills and gullies.
• Surface is considered roughened if depression depths are 50 to 100 mm deep, and 100 to 150 mm
apart.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-12
Erosion and Sediment Control Guide for Urban Construction
A chisel or ripping instrument can be used in most soil conditions.
• On slopes steeper than 2HA V, the tracks left by a bulldozer driving perpendicular to the contour can
leave acceptable horizontal depressions.
Inspection and Maintenance
• Inspect scarified areas weekly, and before and after significant rainfall (see definition in Section 10.1.2) or
snowmelt events, and keep a record of the inspection.
• Ensure vehicles and equipment are not driving over areas that have been roughened as this may result
in the breakdown of the depressions and the creation of tracks which channel water down slopes and
encourage erosion.
• Where roughening has been applied in conjunction with seed, inspect areas to determine the success of
seed establishment and re -seed as needed.
• Identify any areas where roughening should be repeating or where it is providing insufficient erosion
protection.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page BI -13
Erosion and Sediment Control Guide for Urban Construction
MULCHING
Mulch is a layer of organic material applied to a soil surface to help to retain moisture, regulate temperature and
enhance soil health. Common materials used as mulch or as part of a hydraulic mulch mix are straw, shredded
trees or bark, wood shavings, paper fiber and compost. When applied alone on bare soil it can reduce erosion by
absorbing rainfall and acting as a protective physical barrier. It is often applied in conjunction with seed since it
provides the added benefits of insulating the seeds and keeping them in place until they germinate.
Mulch is typically applied using one of the following methods:
Placement and spreading by construction equipment I Dry mulch maybe placed and spread using
construction vehicles such as rubber -tired loaders or dozers. For smaller areas or those with no vehicle
access, manual placement and raking may be suitable. Once applied, dry straw or hay can be kept in place by
crimping it into the soil using a crimper (Figure 61-7).
Figure 131-7: Dry straw crimped into place (left) and hydromulched area (right)
• Hydraulic application I Hydraulically applied mulch, also referred to as 'hydro -mulch' is a slurry containing
mulch materials (typically wood or paper based), water and a tackifier (Figure 61-7). Similar to a hydroseed
mixture, it is stored in a tank and sprayed onto the soil surface using a hose. Helicopters with hydro -mulch
sprayers are used when it is necessary to cover very large areas (e.g. following forest fires).
• Pneumatically applied using a blower truck I A blower truck can be used to apply dry mulch alone or with a
tackifier. When applied as a dry mulch it is more appropriate for application on planted areas rather than on
bare soil areas where it may not stay in place. Blower truck application of mulch with soil and seed is detailed
in the 'Seeding' section.
Application
• Short term erosion control on bare soil areas that are not subject to concentrated flows.
• Dry mulch best used on areas that have been seeded.
• Hydro -mulch (with tackifier) should only be applied alone to areas requiring temporary erosion control,
including areas that are not meant to be seeded at time of mulching.
• Mulch applied for erosion protection on slopes steeper than 2H:1 V should be in conjunction with a tackifier
and/or seeding.
Appendix 8: Erosion and Sediment Control Best Management Practices Page BI -14
Erosion and Sediment Control Guide for Urban Construction
Design and Installation
• Mulching is most effective for erosion control when it
is applied in conjunction with seeding, so that it can
insulate seeds, retain moisture and prevent erosion.
• Select a mulch material which is derived from organic
matter, and is free of weeds, seeds and fragments of
invasive species. Straw mulch should be oat or wheat
straw, while a hydraulic mulch should consist
of wood or paper fibres, water, and a tackifier
(OPSS.PROV 804, 2014). Mulch should not be
derived from chemically treated wood or contain any
additives that could inhibit growth of vegetation.
Guidance on tackifiers is provided under "Chemical
Stabilization" in this Appendix.
Figure 61-8: Straw crimper
• Compost used as mulch should be stable, humus -like
material produced from the aerobic decomposition of organic feedstocks, composted and cured until maturity.
Compost quality should comply with mandatory Ontario MECP Compost Quality Standards for Category'AA'
or'A' and be applied at rates that comply with Canadian Food and Inspection Agency (CFIA) regulations T-4-
93 (CFIA, 1997a) and T-4-120 (CFIA, 1997b).
• Prior to application of hydro -mulch, the soil surface should be prepared by removing large rocks or other
deleterious materials and filling in any rills or gullies. Roughening soil surface prior to application can help to
keep mulch in place.
• Hydraulic mulch should be applied to the soil surface with good coverage. It should be applied with a uniform
thickness, although slightly denser application may be warranted in erosion prone areas.
• Dry straw mulch should be kept in place by application of a tackifier or by crimping into place with a crimper
(Figure 131-8).
• When applying hydro -mulch, consider the drying time and ensure that there will be an opportunity for the
application to dry before the next rainfall event.
• Hydro -mulch should not be applied to frozen soil or during freezing or rainy conditions.
• For direction on the use of mulch in permanent/post-construction site restoration, see the guide entitled
Preserving and Restoring Healthy Soils: Best Practices for Urban Construction (TRCA, 2012).
Inspection and Maintenance
• Inspect mulched areas weekly, and before and after significant rainfall (see definition in Section 10.1.2) or
snowmelt events. Keep a record of inspections.
• Ensure mulch applied on-site is consistent with approved plans with respect to the type and quality.
• Ensure vehicles and equipment are not driving over areas that have been mulched.
• Look for any evidence of insufficient coverage, migration of mulch due to poor attachment or soil erosion
(e.g. rilling). Where erosion is occurring, determine whether re-application is needed, if the area should
be reinforced with additional erosion control measures, or if flows should be re-routed around the area.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-15
Erosion and Sediment Control Guide for Urban Construction
• Regrade and re -apply mulch in areas where coverage was insufficient or where mulch has been removed due
to erosion.
• Refer to inspection and maintenance guidance in 'Seeding' section (p. 131-17) for mulched areas that have also
been seeded.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page BI -16
Erosion and Sediment Control Guide for Urban Construction
SEEDING
The term seeding covers a range of practices, all of which involve the application of plant seed to a soil surface in
order to establish a vegetative cover. Seeding is an important means of stabilizing soil and reducing erosion
during construction as well as at the conclusion of the project. An area may be seeded as a temporary/short term
erosion control strategy or as part of the final site stabilization/restoration plan.
The most common seed application methods are:
Broadcast I Applying seed by hand or with a seed spreader. Because this is labour intensive it is normally
done for relatively small areas or those that are not easy to access with vehicles.
Mechanical l Seed applied directly into the soil by mechanical equipment such as a seed driller (Figure 131-9).
Only vehicle accessible areas can be seeded mechanically.
Figure B1-9: Mechanically seeded area (left) and mechanical seeding equipment (right)
Hydroseeding (a.k.a. hydraulic mulch seeding) I A slurry containing seed, mulch, water and often a
tackifier, stored in a tank and sprayed onto the soil surface using a hose (Figure 131-10). The mixture may also
incorporate additives to improve vegetation growth, such as fertilizer. In very large scale applications,
helicopters equipped with sprayers can be used for application.
Figure B1-10: Hydroseeded area (left) and application of hydroseeding (right)
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-17
Erosion and Sediment Control Guide for Urban Construction
Pneumatic (blown) seeding with growing media
A calibrated mixture of seed and composted soil (or other
growing media) that is applied onto bare soil surfaces
with a blower truck (Figure 131-11). The one-step
application of seed with growing media - and various
optional soil amendments - results in seed that is planted
the place where it's applied, rather than close to the
surface where it could be vulnerable to erosive forces.
This technique can be useful for any kind of stabilization,
but may be cost -prohibitive to apply where only short
term stabilization is needed.
Application
Figure B1-11: Pneumatic seeding with growing
media
Broadcast For small .� d For small areas
areas
Mechanical 4 d
Hydroseeding
Cost -
Pneumatic prohibitive
seeding with unless long v'
growing media term or
permanent
Design and Installation
In addition to the seed application method, information on the species in the seed mix and application rates
should also be provided to the local Conservation Authority for review.
• Seeding or other suitable stabilization should be applied on any stripped
areas of the site that are inactive for more than 30 days.
• More detailed guidance on establishing a healthy soil and vegetative cover
in permanent stabilization areas is available in Preserving and Restoring
Healthy Soil: Best Practices for Urban Construction (TRCA, 2012).
Download at: www.sustainabletechnolooies.ca.
Ground preparation:
• Vehicle track and remove larger obstacles.
• Ensure that the area to be seeded is not compacted, has been roughened
or scarified to create a rough and loose surface.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-18
Erosion and Sediment Control Guide for Urban Construction
• For more information on assessing soil compaction and de -compacting methods, see Preserving and
Restoring Healthy Soil., Best Practices for Urban Construction (TRCA, 2012), section 5.0.
Topsoil (where applicable):
• Ensure the topsoil does not contain materials or contaminants at levels that would be harmful to plant growth,
impair drainage, or adversely impact its intended use. Topsoil should:
- Be free of refuse, stones, wood or debris larger than 50 mm in diameter;
- Be free of deleterious substances, plant or soil pests, undesirable grasses, noxious weeds or weed seeds.
- Meet topsoil specifications found in Construction Specifications for Implementing Compost Amended
Planting Soil in Ontario (TRCA, 2017), available at www.sustainabletechnologies.ca.
• Topsoil should have a pH of 6.0 to 8.0 and contain 5 to 15% organic matter (by dry weight), depending on the
type of vegetation to be established. A higher organic matter content is recommended for planting beds and
tree pits, since larger, deeper rooting plants need deeper and richer topsoil to thrive.
• Ensure topsoil application at a minimum thickness of 200 mm. Where a pneumatic seeding application is
used, topsoil may be substituted with the pneumatically applied growing media itself.
• Total uncompacted soil depth (topsoil + subsoil) should be at least 300 mm.
Seed:
• Consider whether you need a secondary erosion barrier during seed
establishment:
o Where broadcast or mechanical seeding is being used, additional erosion
protection (e.g. rolled erosion control product) is required until seed is well
established.
o If hydroseeding is being used, the area can be considered stabilized as
soon as the application is successfully completed, provided that a tackifier
was included in the slurry. If no tackifier was included, additional erosion
protection (e.g. rolled erosion control products) should be used until seed is
established, particularly in high erosion risk areas.
o Where pneumatic seeding with growing media is used, it can prevent
erosion immediately after application.
o Regardless of seeding method used, more intensive erosion controls (e.g. hard armoring, cellular
confinement system) may also be necessary in high erosion risk areas (e.g. slopes steeper than 2HA V).
• For permanent stabilization areas (e.g. restoration areas, stormwater pond blocks), choose an appropriate
seed mix based on site conditions, climate, surrounding vegetation community, topography, soil conditions,
and adjacent land uses.
• Native seed mixes are required in CA regulated areas and recommended in non-regulated areas.
• For permanent stabilization areas, seed mix should be applied at a rate of 22-25 kg/ha or approximately
250g/90 ml for smaller areas.
• A nurse/cover crop should be added to every seeding application — to aid in the quick establishment of erosion
and weed control — at a rate of 15-22kg/ha.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-19
Erosion and Sediment Control Guide for Urban Construction
• If cover crop is being used alone (e.g. temporary stabilization areas), application rate should be 25-60 kg/ha,
depending on the density of cover needed to prevent erosion.
• For cover crops, ensure that the timing of the application coincides with appropriate growing windows as listed
in Figure 131-12.
• If germination is not anticipated during the same growing season when seeding was carried out, additional
erosion control measures (e.g. rolled erosion control products) are required to provide interim stabilization until
vegetation is visible.
Watering may be required
Restoration/Enhanceme Vroceed to
Spring -summer (p
Spring -summer
Short term or
longterm
50% Oats
to promote successful
establishment/ growth.
Stabilization
(stockpile ortempararysite
stabilization without native see
(May -September)
(0-2 Years)
50% Barley
No further maintenance
mixapplici tion)
150g/100m2 Notapplicable
Recommend ahigh
(site will be disturbed and
Applied at 60kg/ha
mowing- 1-2 times in the
Fall (October-
Step 4)
Winter Wheat
replanted).
or
Short term or
600g/100m2
Fall (October-
Longterm
100%
if stabilization is required
(forsmallersites)
November
(0-2 years)
Winter Wheat
for longer than 2 years,
- high mowing= -15-25c.
recommend siteto be
assessed and reseeded as
Note:Ifplantingperiod/timingisnotknown tithe time orsubmissien.designplansmayincWdemultiplecowrcropoptions with
Restoration/Enhanceme Vroceed to
Spring -summer (p
40% Oats
45%Barley
ma
Watering required
maybe
(planted with native seed mix).
Applied 15kg/ha (May -September) Step 4)
5% Canada Wild Rye
to promote successful
at
establishment/ growth.
or
150g/100m2 Notapplicable
Recommend ahigh
(for smal ter sites)
(proceed to
100%
mowing- 1-2 times in the
Fall (October-
Step 4)
Winter Wheat
first growing season after
November)
planting to help control
aggressive weed species
and improve likelihood of
t Application rates may need to be adjustedforother project-specificgoals
native seed mix planting
Please note if planting is to occur outside the recommended planting period, other interim site/ soil stabilization measures will be
establishment/ success.
required. Please cnrdact CVC if planting outside the recommended plantingperiod
- high mowing= -15-25c.
Mowing to occur once in
Note:Ifplantingperiod/timingisnotknown tithe time orsubmissien.designplansmayincWdemultiplecowrcropoptions with
late June and/or in July.
appropriatetimingforplantingnoted on the drawings
Figure B1-12: Decision guide for cover crop selection. Source: Plant Selection Guide (CVC, 2018).
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-20
Erosion and Sediment Control Guide for Urban Construction
Inspection and Maintenance
• During seeding, check seed tags to confirm that the correct (approved) seed mix is being applied.
• Inspect seeded areas weekly, and before and after significant rainfall (see definition in Section 10.1.2) or
snowmelt events, and keep a record of the inspection. Beyond this routine inspection, additional inspections of
seeded areas may be needed when the seed is newly planted as well as during periods of drought.
• Establish a plan to ensure seeded areas are irrigated as needed, particularly if application is occurring during
dry weather periods.
• Ensure vehicles and equipment are not driving over areas that have been seeded. To prevent damage,
seeded areas should be fenced off during vegetation establishment, particularly if it is a busy and
heavily used area.
• During inspection, determine whether seed is well established with good coverage (>80%).
• Look for any evidence of erosion on seeded areas (rilling). Where erosion is occurring, determine
whether a higher seed application rate is needed, if the area should be reinforced with additional erosion
control measures (e.g. blankets, mats), or if flows should be re-routed around the seeded area.
• Regrade and re -apply topsoil and seed in areas that didn't take or that have been removed by erosion.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
• Consider planning and budgeting for long-term as re -seeding may be required over time.
Appendix B: Erosion and Sediment Control Best Management Practices Page 81-21
Erosion and Sediment Control Guide for Urban Construction
OUTLET PROTECTION
Outlet protection practices prevent scour erosion immediately
downstream of pipe and channel outlets that discharge water from
construction sites. They fall into the following two general categories:
• Energy dissipation devices I These structural devices are
placed downstream of outlets, in the path of concentrated flows, in
order to interrupt flows, reduce water velocities and thereby lessen
the potential for scour. Examples of common energy dissipating
devices include check dams, wattles and baffle blocks (Figure 61-
12). Level spreaders are also applied to dissipate energy and
reduce water erosivity by forcing water to leave the outlet area as
sheet flow.
• Surface hardening / ground covers I Creating a more erosion -
resistant surface is another important way to prevent scour from
concentrated flows downstream of outlets. The greater and more
concentrated the flow being discharged from the outlet, the more
resilient the surface cover should be. Surface covers downstream
of outlets can range from a soft -armored natural cover (e.g.
RECP-reinforced vegetated area, thick and matted vegetative
cover) to harder manufactured structures (e.g. concrete
headwalls, riprap lining, flexible rubber mats).
Application
Figure B1-12: Erosion blanket in an
outlet area (top) and baffle blocks for
energy dissipation (bottom)
• At the base of any stormwater outlet releasing concentrated flow, including but not limited to: drainage tiles,
detention facility outfalls, and piped or channel conveyance systems.
• Applied to mitigate scour erosion resulting from discharge leaving the site as well as discharges related to
water movement within the active construction area (e.g. slope drain outlets, pumping and watercourse
diversions).
• Need for outlet protection is greatest where flows are high and concentrated, and where discharge is being
conveyed directly off the site and into a natural feature. In these cases, outlet protection is the last line of
defense protecting the natural feature from erosion and sediment deposition.
Design and Installation
• Outlet protection measures should be designed to blend in with the surrounding natural environment as much
as possible, incorporating vegetation and stone to create scour resistant surfaces. Where manufactured
support structures are necessary due to high flow rates, they should be integrated with vegetation if possible.
• Providing adequate protection against scour at stormwater outlets typically requires at least some hard
armoring, typically incorporating riprap. Riprap stone should be underlain with a geotextile (or graded
aggregate filter), covered with a stone base, and be sized to resist the tractive forces of the flow from the
outfall and, where applicable, the lateral flow of the receiving channel. Typically the minimum diameter of
riprap stone should be 300 mm.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-22
• Where stone (sub -angular
recommended) is used for
protection below an outlet in a
natural feature, geotextile liners
should not be installed below
the stone, as this compromises
the stream bed as a habitat for
aquatic organisms.
• For outlets discharging to a
flowing receiving channel, pipes
and structures must be aligned
to avoid erosion caused by
lateral flows in the vicinity of the
exposed structure.
Erosion and Sediment Control Guide for Urban Construction
• Energy dissipation in the form of
structural stilling basins, baffle (chute) blocks or other structural flow interrupters are often required for
stormwater discharge velocities z 3 m/s.
• Where the outlet discharges to a grass -lined ditches/channels, flow velocities should not exceed 1.2 m/s.
Flows above this threshold will typically cause the channel to erode. If discharge velocities cannot be reduced
or some of the flow diverted to a different outlet, then energy dissipation measures should be employed in the
channel to slow down the water as it moves into and through the channel.
• Where level spreaders are applied they must be installed so that they are completely level, otherwise flows will
concentrate at the low point instead of flowing uniformly over the spreader.
• Protection measures must be in place prior to any conveyance of runoff through the outlet structure.
Inspection and Maintenance
• Inspect all stormwater outlets weekly, and before and after significant
rainfall (see definition in Section 10.1.2) or snowmelt events, and keep a
record of the inspection. Prioritize inspection and maintenance of outlets
that discharge directly to natural features.
• Look for evidence of erosion downstream of the outlet and recommend
options for either reinforcing/hardening the surface, dissipating energy
through flow interruption, reducing flow from the outlet, or a combination
of these solutions.
• Assess the degree of sediment accumulation behind energy dissipation
devices. Sediment accumulated behind flow interrupters like baffle blocks, check dams, filter socks and
wattles/logs should be removed when it has reached approximately 30% of the height of the device, or sooner
if there is evidence that sediment is being re -suspended.
• If a sediment bag has been used to dissipate and disperse flow from an outlet, inspect the sediment bag to
determine whether it requires changing or is damaged in any way. Additional guidance on sediment
(dewatering) bags is provided in Appendix B2
• Assess whether there has been any shifting of structural components or structural damage to hard or soft
armored surfaces downstream of outlets, and recommend the necessary maintenance and/or repairs.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-23
Erosion and Sediment Control Guide for Urban Construction
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural receptors
are at imminent and foreseeable risk of adverse impact.
1.
Discharge
Pipe
Outlet Slope to
Headwall match
existing
Existing groumd— ground
Riprap apron (depth, J
width & rock sized Toe wall
according to outflow)
Figure B1-13: Storm drain outfall protection. Source: Sediment & Erosion Control on Construction Sites — Field
Guide (University of Virgin Islands, 2003).
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-24
Erosion and Sediment Control Guide for Urban Construction
ROLLED EROSION CONTROL PRODUCTS
(abbr. RECPs)
Rolled Erosion Control Products (RECP) are prefabricated blanket -like ground covers, made up of organic and/or
synthetic materials and designed to act as a physical barrier to erosive forces. RECPs are typically applied and
stapled into place over bare soil areas or on newly seeded areas, but sometimes are set up for added long term
stabilization of vegetated areas with high erosion risk. In addition to acting as a physical erosion barrier, RECPs
promote the establishment of vegetation by allowing for water infiltration (resulting in higher soil moisture levels),
protecting seed from being carried away or consumed by wildlife, and moderating soil temperatures.
Specific types of RECPs include:
Netting I A woven degradable net composed of material like jute, straw or coir
(coconut fibre), which provides temporary stabilization to aid in the
establishment of vegetation. Highly erodible slopes may require application of
a sub layer of straw mulch overlain with netting, which is stapled through to
enhance ground contact.
Blankets l Typically composed of coir, straw or wood fibre woven within a
photodegradable netting to form a thick blanket. Often used as a temporary
measure to protect against erosion during seed establishment, although some
types can last up to 2 years. They have a lower tensile strength compared to
mats, but are capable of better ground contact.
• Turf reinforcement mats (TRM) I Hardy materials, such as coconut husk
fibers or synthetic polypropylene fibers, woven together to provide the highest
tensile strength and most long term erosion control of any of the RECPs.
Composite TRMs combine the protection of a blanket with the added
reinforcement of netting in areas requiring long term or permanent
stabilization.
Application
• Un -vegetated areas that convey concentrated flows, including swales and ditches.
Figure B1-14: From top to
bottom -jute netting, coir
blanket and a turf
reinforcement mat
• Any slopes steeper than 2H:1 V that have not been stabilized with other erosion control measures (e.g.
vegetation). Newly seeded areas where germination/vegetation establishment has not yet occurred. See
"Seeding" section for guidance on when seeded areas require secondary erosion controls.
Riparian areas or within natural water features or watercourse diversions if conservation authority
approval has been granted.
• Banks of sediment control traps or basins, on a temporary basis until they are seeded. RECPs should
also be used on newly seeded banks if the seeding method does not provide immediate soil
stabilization.
Erosion scars.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-25
Erosion and Sediment Control Guide for Urban Construction
• Any other areas requiring erosion protection and where ground surface is not rocky.
• Not suitable for application when ground is frozen.
Design and Installation
• Consult with RECP suppliers for information and guidance on
selection of an appropriate product, with consideration for
required longevity, slopes, and flow velocities.
• Site conditions and the required longevity of the RECP will
inform which product is best suited for the application.
Biodegradable RECPs should be selected where they are
serving as a temporary erosion control. Non -biodegradable
plastic components may be necessary in some permanent
installations where long term heavy duty stabilization is
required, but in general these types of plastics should not be
installed and left in vegetated areas indefinitely.
• Consult the local Conservation Authority if the application is
proposed within a water feature or watercourse diversion channel.
Figure B1-15: RECP installed on a slope
and anchored in place at the top
• Prepare the exposed surface by removing mounds, protruding objects that could cause punctures, etc.
to ensure that there will be a firm, continuous contact between the RECP and the ground. Tenting must
be avoided as it creates a drip zone that will lead to erosion of the soil under the blanket.
• Where RECP is protecting a seeded area, apply topsoil and seed prior to installing the RECP.
• RECPs should be installed vertically down slopes for slopes 3H:1 V or steeper. On slopes with a lower
grade, RECPs can be installed horizontally across the slope where necessary. (see Figure 61-16)
• Ensure that sections overlap at edges and at the ends. The upslope segment of the RECP should
always be on top as it overlaps with the next downslope segment. This prevents the RECP from being
breached by water flowing over the surface. RECP segments overlapping parallel to the direction of
flow should overlap at least 10 cm, while segments overlapping perpendicular to the direction of flow
should overlap at least 30 cm. See Figure 131-16.
• For installations on either slopes or channels/swales, RECPs should always be installed starting at the
top of the slope (or side slopes in the case of a channel/swale). Without protection the top of slope will
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-26
Erosion and Sediment Control Guide for Urban Construction
be highly susceptible to rill erosion, which could ultimately undermine
the RECP.
When applied on slopes or conveyance channels, the use of an
anchor trench at the top and/or bottom ends can help to keep the
RECP in place (see Figure B1-16). Anchor trenches should be at least
15 cm by 15 cm. If the RECP is not long enough to extend the full
length or the slope of channel, a check slot (15 cm by 15 cm in size)
should be constructed at the location where the RECP will overlap with
the next downslope piece in order to help keep the downslope
segment in place.
• RECPs should be attached to the ground surface with wire staples,
metal geotextile stake pins, or triangular wooden stakes, all of which
should be at least 15 cm long.
Figure B1-16 provides some general guidance for installation, but the manufacturer should be consulted on the
best method for application. Follow manufacturer's product specific application instructions, including
anchoring and staple patterns.
Inspection and Maintenance
• Until vegetative cover is well established, inspect areas covered with RECPs weekly, and before and after
significant rainfall (see definition in Section 10.1.2) or snowmelt events, and keep a record of the inspection.
Newly seeded RECP-covered areas may warrant more frequent inspection. See pages 131-17 to B1-21 for
guidance on inspection and maintenance of seeded areas.
• Ensure good contact with the ground and that there is no tenting of the RECP or erosion of the soil
surface under the blanket.
• Inspect the condition of the RECP to ensure it has not been torn or detached.
• Re -attach or replace any RECP anchors (e.g. staples, stakes) that have come loose.
• Where anchor trenches or check slots are used, ensure RECPs are still firmly secured.
• Ensure vehicles and equipment are not driving over areas that have been covered with RECPs. To
prevent damage, areas should be fenced off during vegetation establishment, particularly if it is a busy
and heavily used area.
• Where erosion is occurring under the RECP, consider whether the blanket needs better contact with the
ground, if a higher tensile strength RECP should be used, or if flows should be re-routed around the
area.
• Repair eroded areas by removing RECPs, re -grading, re -applying topsoil and/or seed, and re -installing
RECPs.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-27
Erosion and Sediment Control Guide for Urban Construction
CHEMICAL STABILIZATION
(a.k.a. tackifiers, soil binders, polymers, soil stabilizers)
Chemical stabilization is an umbrella term that includes a variety of substances — ranging from natural to synthetic
— that can be applied to increase the cohesion of soil surfaces by binding soil particles to one another, and/or to
mulch. They are often applied for protection from both water and wind erosion on construction sites. Chemical
stabilization can be particularly useful in areas where soil stabilizing vegetation has been difficult to establish.
While they can provide some erosion protection when used alone, soil stabilizers work most effectively when
applied to keep soil in place during seed establishment, often as part of a hydroseeding or hydromulch mix.
When added to these hydraulically applied products, they help to establish more long term or permanent
vegetative stabilization. Because chemical soil stabilizers allow water to infiltrate while keeping soil, mulch and
seed in place, they promote moisture retention and improved vegetation establishment. Some chemical
stabilizers can also help to improve the consistency of hydraulic mixes, making them easier to apply.
Chemical soil stabilizers are often categorized as follows
• Plant -based short term (e.g. guar, psyllium, starch), and long term (e.g. pitch and rosin emulsions)
• Synthetic petroleum -derived polymers (e.g. anionic polyacrylamide, polyacrylate)
• Cementitious binders (e.g. gypsum)
Figure B1-17: Application of hydroseed containing tackifier (left) and granular anionic polyacrylamide (right)
Application
• Use in and/or within 30 m of a natural water feature is subject to CA approval. Toxicity data as described under
'Design and Installation' must be available upon request.
• Best used in conjunction with seeding, such as within a hydroseeding or hydromulching mix in order to
establish a more lasting stabilization.
• When used with seed, suitable for any areas requiring erosion protection, including slopes, interceptor swales
and any other areas not subject to vehicle traffic.
• Only applied on bare/unseeded soil if the following criteria apply:
o Regular reapplication at the supplier's recommended frequency can be maintained.
o The area is receiving only non -concentrated sheet flows
o The area will not be subject to vehicle traffic or other earth disturbing activities
o Stabilization is only needed on a short term basis
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-29
Erosion and Sediment Control Guide for Urban Construction
• Local policies on the use of chemical stabilization may differ from the information provided herein. Confirm
local policies prior to including chemical stabilization on ESC plans.
Design and Installation
• If the product is being mixed and applied by a third parry, ensure that they are following the requirements listed
herein.
• Chitosan and other cationic polymers (e.g. cationic polyacrylamide) should not be applied as soil stabilizers on
construction sites due to their toxicity to aquatic organisms.
• Application rates vary according to the method of application and the specific type of chemical stabilizer.
Ensure theproduct is applied at the manufacturer's recommended
application rate.
• Ensure product labelling and/or packaging is available for the chemical
stabilizer, which specifies the following:
o product expiry date
o use instructions, including application rates and mixing methods (if
applicable)
o recommended re-application frequency and other maintenance
requirements
o safe handling, storage and disposal information
• Any applications of anionic PAM -based products should meet the
criteria detailed in Anionic Polyacrylamide Application Guide for Urban
Construction in Ontario (TRCA, 2013).
The chemical stabilizer must be safe at the expected application rate and based on the intended use.
Evidence of this should be available in the product's Material Safety Data Sheet (MSDS) and/or toxicity
reports. As a minimum, acute and chronic toxicity data, based on testing by an accredited third parry, should
be available for the following aquatic organisms: fathead minnow (Pimephales promelas), rainbow trout
(Oncorhynchus mykiss) and water flea (Daphnia magna). The LC -50 concentrations (the concentration of
polymer that is lethal to 50% of the sample population) listed in toxicity reports must exceed the maximum
anticipated release rate of the product based on the way it's being used.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-30
Erosion and Sediment Control Guide for Urban Construction
• Certain chemical stabilizer products, such as anionic PAM based products, are available in different
formulations designed to bind different soil types. Where this type of product is being used, ensure that the
formulation selected is effective for the specific soil on site. This is often done by submitting a soil sample to
the supplier for testing. Chemical stabilizers that are ineffective at binding to soil will be easily washed away
during a rainfall event, and could end up in undesired locations such as natural features.
• Prior to application of a chemical stabilizer, alone or as part of a hydraulic mix, the soil surface should be
prepared by removing large rocks or other deleterious materials and filling in any rills or gullies
• When using a chemical stabilizer in conjunction with seeding, the
top few inches of soil should be de -compacted to ensure good
germination.
• Consider the drying time for the selected chemical stabilizer and
ensure that there will be an opportunity for the application to dry
before the next rainfall event.
• Avoid hydraulic application of chemical stabilizers during windy
conditions in order to avoid having the product end up in
unintended areas.
• Chemical stabilizers should not be applied to frozen soil or during
freezing or rainy conditions.
Inspection and Maintenance
Figure B1-18: Soil surface stabilized
with anionic PAM
• Inspect chemically stabilized areas weekly, and before and after significant rainfall (see definition in Section
10.1.2) or snowmelt events, and keep a record of the inspection. Beyond this routine inspection, additional
inspections of seeded areas may be needed when the seed is newly planted as well as during periods of
drought.
• Where the stabilizer has been applied in conjunction with seed, refer to guidance on inspection and
maintenance of seeding on p 61-21.
• Confirm that the chemical stabilizer has been applied evenly with coverage of at least 80%.
• If the stabilizer has failed to adsorb to the soil particles, it can be easily washed away during a rainfall event
and migrate downslope from the intended treatment area. If this is observed it may mean the stabilizer is
ineffective for the soil type, and that a different formulation should be applied.
• Ensure vehicles and equipment are not driving over areas that have been treated. To prevent damage,
chemically stabilized areas can be fenced off, particularly if it is a busy and heavily used area.
• Look for any evidence of erosion on chemically stabilized areas (rilling). Where erosion is occurring,
determine whether a second application is needed, if the area should be reinforced with additional
erosion control measures (e.g. blankets, mats), or if flows are too concentrated and should be re-routed
around the treated area.
• Regrade and re -apply stabilizer in areas that have been subject to erosion or where the initial application was
deficient.
• Re -apply at the frequency recommended by the product supplier/manufacturer to ensure area remains
stabilized. If stabilizer was applied with seed, re-application of chemical stabilizer is needed (at the
recommended frequency) only until vegetation is well established.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-31
Erosion and Sediment Control Guide for Urban Construction
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
• Consider planning and budgeting for long-term as re-application may be required over time.
Appendix B: Erosion and Sediment Control Best Management Practices Page B1-32
Erosion and Sediment Control Guide for Urban Construction
132: SEDIMENT CONTROL PRACTICES
While erosion control is preventive in nature, as it is focused on keeping soil in place, sediment control measures
are corrective in nature, meant to remove sediment that has already become suspended in stormwater. The
multi -barrier approach to erosion and sediment control requires the application of both types of controls in series
to create a resilient system to protect the natural environment from sediment impacts. Sediment removal can be
achieved in a variety of ways, but controls are generally focused on settling, filtration, or a combination of the two.
Settling controls promote gravitational settling of suspended sediment by detaining stormwater and reducing flow
velocities. While chemical flocculants can also be used to promote gravitational settling, they do so by
agglomerating particles, making them heavier, larger, and more susceptible to settling or filtration. Settling
controls may be applied to treat concentrated flows (e.g. check dams) or sheet flows (e.g. silt fencing). They are
often applied in conveyance systems (e.g. interceptor swales), at the site perimeter, or anywhere it is necessary
to separate a significant sediment source from a protected receiver. For example, controls may be applied
around a storm drain inlet in order to prevent sediment from entering catchbasins, and eventually the receiving
water system.
Filtration controls are porous materials (e.g. geotextile) which hold back sediment from stormwater that passes
through them, with the filter's apparent opening size dictating the size of particles it can filter out. Because
filtration controls also tend to reduce flow velocities, they can serve as settling controls as well.
Detailed guidance on the following sediment control practices are included in Appendix B2:
Flictices Page
Sediment control fence
B2-2
Filter socks
B2-8
Natural fibre logs / wattles
B2-13
Rock check dams
B2-17
Storm drain inlet protection
B2-21
Sediment (dewatering) bags
B2-25
Sediment traps
B2-29
Sediment control ponds
B2-32
Weir tanks
B2-38
Polymer flocculants
B2-40
Active treatment systems
B2-45
Vehicle tracking control
B2-48
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-1
Erosion and Sediment Control Guide for Urban Construction
SEDIMENT CONTROL FENCE
(a.k.a. Silt fence)
Sediment control fence consists of geotextile material
supported by posts and trenched in to the ground. It
functions as a settling control by reducing velocity,
ponding sheet flows and promoting gravitational
settling of suspended sediment. It is also an effective
means of redirecting sheet flows towards a treatment
area (e.g. sediment control pond or trap). Despite
the permeability of the non -woven geotextile fabric
used in this type of fencing, it should not be used as
a means of filtering sediment laden water as it does
not effectively filter out fine particles (< 50 pm).
There are three primary components that make up Figure B2-1: Sediment control fence
sediment control fence: geotextile fabric, structural
fencing support, and posts. The structural fencing support, often a page wire fence to which the geotextile
is attached, keeps the geotextile fabric upright in between posts, while the posts keep the entire
installation upright.
Application
• Along the perimeter of a construction site
• Along the up -gradient side of sensitive areas, streams and river corridors
• Around stockpiles of excavated material, such as topsoil
• Approximately 1.5 metre away from the base of moderate slopes
• Any other areas where sediment laden sheet flow requires treatment, provided that the fencing
is installed parallel to the site contours.
• Sediment control fences should not be used perpendicular to flow in watercourses or other
concentrated flow paths.
• Sediment control fence is meant to be used as a treatment measure for sheet flows and does
not need to be installed as a means of delineating site boundaries if the area does not receive
any sheet flow (e.g. high point). In these areas other types of fencing may be used if desired.
• For installation of sediment control fence on slopes, the grade and slope length must be
considered to ensure that flows will not overwhelm the structural stability of the fence. The
following are the maximum lengths of slopes on which sediment control fencing should be
installed, according to grade.
Slope grade Maximum slope length for sediment control fence
2H:
1V
15m
3H:
1V
25 m
4H:
1V
40m
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-2
Erosion and Sediment Control Guide for Urban Construction
Design and installation
Materials specifications
• Posts used to support sediment control fence should be
sturdy material such as steel t -bar with length >_ 1.5 m.
• In areas where sediment control fence is being used as a
barrier to protect a natural feature, wooden posts
(recommended cross-section 10 cm by 10 cm) should be
used instead of t -bars. Alternatively, a double row of t -bar
supported sediment control fence (Figure 132-2) could be
applied in these sensitive areas to provide multiple barriers
and a high level of protection.
Structural support fencing should be a high tensile strength
galvanized page wire fence. Recommended specifications are
14 gauge wire thickness and opening size of 10 by 10 cm.
Structural support fencing with similar strength, flexibility, and weather resistance is also suitable.
• Prefabricated sediment control fence products with wooden stakes already attached to
geotextile should be avoided due to their lack of structural stability and inability to allow deep
water ponding.
• Geotextile used in sediment fence should be non -woven and meet or exceed the following
specifications:
Material property
Grab strength (machine
direction)
Grab strength (cross
direction)
Permittivity
Apparent Opening Size
(AOS)
UV Stability
Test methods
Minimum value
Type of value
ASTM D4632/D4632M
550 N'
Minimum ARVz
ASTM D4632/D4632M
450 N'
Minimum ARV2
ASTM D4491 /D4491 M
0.05 sec-'
Minimum ARVz
ASTM D4751
0.60 mm
Maximum ARVz
ASTM D4355/D4355M 70% after 500 hrs of
exposure
' Products with tensile strengths up to 10% less than specified minimum may also be considered.
3 ARV: Average Roll Value
Fence installation
• Support posts should be no more than 2 metres apart and driven into the ground to a depth of at
least 90 cm.
• Brace the fence posts diagonally in areas where deep ponding is anticipated.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-3
Erosion and Sediment Control Guide for Urban Construction
• Geotextile fabric should be stretched tight
across the structural fencing with no sagging
and extend up from the ground to a minimum
height of 60 cm. Fabric should be fastened to
the structural support fencing and support posts
with wire ties tied at the posts.
• Where the geotextile is joined to provide a
continuous run, the ends should be overlapped
at least 50 cm and securely fastened to posts.
• The bottom 30 cm of the geotextile should be
tied into soil, using either static slicing or
trenching methods, to ensure there is no space
between the bottom of the geotextile and the
ground. The trench should be constructed to
be at least 20 cm deep an 40 cm wide (see Figure 132-3a).
Figure B2-2: Double row sediment control fencing
• The trench should be backfilled and compacted to ensure structural stability of the fence.
In frozen soil conditions, if trenching cannot be achieved the geotextile should be secured with a filter
sock (recommended diameter of 450 mm) staked into place along the upstream side of the fence (see
Figure 82-3b)
• Double row sediment control fence should be installed with straw bales or a similar measure to
provide structural support in between the fence rows.
Fence placement
•
Insensitive areas (e.g. within or adjacent to natural features) consider whether sediment control
fence installation will create excessive ground disturbance. In these cases, a different type of
sediment control barrier may be advisable or recommended by the local Conservation Authority.
• Maintain a vegetated buffer of at least 3 m down gradient of sediment control fencing. Larger
buffers are required adjacent to natural features based on defined limits of development, as
described under "Vegetated buffer strips'.
• Consider installing additional sediment controls, double row sediment control fence, or sediment
control fence supported by wooden posts in areas within or adjacent to natural features.
• Always install sediment fence:
o along the contour and not on up and down slopes;
o with end sections constructed up the slope to stop runoff from flowing around the ends of the
fence; and
0 on the flat area at least 1.5 m away from the toe of a slope.
• Place wisely to avoid using more fencing than needed, resulting in additional waste sent to
landfill. Installing sediment fence upgradient of sediment sources should be avoided if possible,
with other simpler and more reusable types of fence used when the only objective is delineating
boundaries.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-4
Erosion and Sediment Control Guide for Urban Construction
Inspection and maintenance
• Inspect the entire length of sediment fence weekly, and before and after significant rainfall (see
definition in Section 10.1.2) or snowmelt events, and keep a record of the inspection.
• Inspect the fence to look for any signs of damage to the geotextile or compromising of the
structural integrity of the fence. Ensure the fence has been properly installed as defined under
"Design and Installation" section above.
• Remove and properly dispose of sediment before it reaches approximately 30% of the height of
the fence, or sooner if not functioning as intended.
• A supply of sediment control fence materials should be kept on site to allow for quick repairs or
the installation of additional fencing as needed.
• Where fence continues to fail on an ongoing basis, consider reinforcing problem areas or
replacing with an alternative sediment retention device. If failure is a result of concentrated
flows being directed to the fence, consider re -designing surface water flow paths to reduce
volumes being directed to the problem area.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact. Higher priority should be assigned
to repair of sediment fence installed upgradient of natural features.
Decommissioning
. Ensure removal and proper disposal of accumulated sediment.
. All materials associated with the sediment fence must be removed once the site has been
restored and disturbed areas have been stabilized.
All sediment fence materials should be removed from the site. Reusable components can be
salvaged for future use and others should be disposed of at an appropriate waste facility.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-5
Erosion and Sediment Control Guide for Urban Construction
CONSTRUCTION AREA TERMINATE FENCE IN
TERMINATE J -CURVE FACING UP SLOPE
FENCE IN
J -CURVE FACING
UP SLOPE- -
ue
.., AREA TO BE
,,PROTECTED -
2 m END RUN
FACING UP SLOPE
PERSPECTIVE VIEW
DIRECTION
OF FLOW
A
2 m MAX. - - - L♦
TYP. A
MAIN RUN
I
PLAN VIEW
NON -WOVEN GEOTEXTILE FABRIC AS PER SPECIFICATIONS
LISTED UNDER'SEDIMENT CONTROL FENCE' IN APPENDIX 8
OF ESC GUIDE FOR URBAN CONSTRUCTION
DIRECTION
OF FLOW
200 mm
z_
300mm MIN OF
E GEOTEXTILE
o IN TRENCH
m
TRENCH TO BE BACKFILLED WITH
NATIVE MATERIALS AND COMPACTED
SECTION VIEW
T -BAR
WIRE
2m END RUN
FACING UP SLOPE
VOTE: THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL
NEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
TRCA ESC DESIGN DETAIL scALE REV DATE
N.T.S. 1 MARCH 2019
$Q on DRAWING TITLE DWG NO
SEDIMENT FENCE (UNFROZEN CONDITIONS) 03
"V IMER: TORONTO AND REGION CONSERVATION AUTHORITY ITRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE
T FOR REFERENCE ONLY
Figure 62-3a: Design detail for sediment control fence (unfrozen conditions).
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-6
Erosion and Sediment Control Guide for Urban Construction
CONSTRUCTION AREA TERMINATE FENCE IN
TERMINATE J -CURVE FACING UP SLOPE
FENCE IN
JCURVE FACING
UP SLOPE ,• (O v t •��J'.�y�
AREA TO BE
,,,PROTECTED
zS
PERSPECTIVE VIEW
DIRECTION 2 M END RUN
OF FLOW
..
3
2 m MAX,
TVP• A TIII
MAIN RUN
r
PLAN VIEW
NON -WOVEN GEOTEXTILE FABRIC AS PER SPECIFICATIONS
LISTED UNDER'SEDIMENT CONTROL FENCE' IN APPENDIX B
OF ESC GUIDE FOR URBAN CONSTRUCTION
i 200 mm JIVPAIGEWIRE
FILTER SOCK
E
E T -BAR
DIRECTION $
OF FLOW e
STAKE. IF POSSIBLE,
TO KEEP IN POSITION
SECTION VIEW
VOTE: THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL
AEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
TRCA ESC DESIGN DETAIL SCALE. T.S. REV DATE
N. 1 MARCH 2019
Iw' C fir' an DRAWING TITLE DWG NO
Awhadly SEDIMENT FENCE (FROZEN CONDITIONS) 04
"ID REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE
V
Figure B2 -3b: Design detail for sediment control fence (frozen conditions).
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-7
Erosion and Sediment Control Guide for Urban Construction
FILTER SOCK
(a.k.a. biofilter sock)
A filter sock consists of a tubular mesh casing that is
filled with a natural material, such as compost or
wood chips. They are typically filled on site using a
pneumatic blower truck (Figure 624). Filter socks
function as settling controls, decreasing flow
velocities to cause gravitational settling of
suspended sediments behind and within the sock.
Depending on the fill material used, contaminants
other than sediment may also be attenuated and
degraded through chemical and biological
processes. For example, the microbial activity in
compost — present at much higher concentrations
than in soil — can degrade hydrocarbons and
convert them to nontoxic by-products (Khan, at al
Figure B24: Filter sock being filled on site
2006). Despite the capabilities of filter sock variations,
the guidance herein focuses on the removal of sediment (and sediment -bound contaminants) with
compost and wood -chip filled socks, which occurs primarily through physical settling.
• Wood chip fill I Socks filled with uncomposted wood chips can be an effective means of causing
construction sediment to settle out of suspension. This process can also result in significant removal
of other contaminants that adhere to sediment particles, such as metals and nutrients. Where
sediment removal is the only objective, wood chip filled socks are often more cost effective than their
compost filled counterparts.
Compost fill I The properties of compost - including its texture, porosity, water retention capacity and
hummus content — make it an effective media for filtering out sediment and other contaminants,
including those which do not adhere to sediment particle surfaces (e.g. petroleum hydrocarbons,
soluble nutrients). Beyond this added contaminant removal benefit, socks filled with compost can also
support vegetation, which means they can be seeded at the time of installation. Alternatively, compost
from socks with biodegradable mesh can be spread around and seeded as part of their
decommissioning.
Figure B2-5: Compost fill (left) and wood chip fill (right) used in filter socks.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-8
Erosion and Sediment Control Guide for Urban Construction
Application
Filter socks can be used in a variety of sediment control applications depending on their circumference,
length and how they are placed/positioned. Common sediment control applications of filter socks include:
• As flow interruption on level and sloped areas where they are applied along contours,
perpendicular to runoff sheet flows;
• At the base of slopes, at a recommended distance of at least 1.5 m from the based in order to
provide adequate space for sediment deposition;
• Along the site perimeter in areas of sheet flow;
• Perpendicular to channelized flow in swales and ditches where they function as check dams;
• Around storm drain inlets receiving sheet flows;
• At the base of topsoil stockpiles;
• Around sediment bags as part of a dewatering treatment train (see 'sediment bags' on p. B2-
25);
• During frozen conditions in place of sediment fence that cannot be trenched in; and
• Any other areas where it is necessary to dissipate flow velocities and pond water to promote
sediment settling.
Design and installation
Product specifications - casing
Biodegradable and non -biodegradable casings are available depending on the intended application.
Where filter socks are being used for permanent stabilization, particularly for construction projects in
natural water features, biodegradable mesh casing can be a useful option. Confirm casing life span
with the product manufacturer / supplier.
• Non -biodegradable mesh casing should be UV stable and durable. Typical thickness is approximately
5 mm and size of openings is approximately 3 mm.
Product specifications — wood chip fill
• Free of any refuse, weeds, contaminants or other materials toxic to plants, wildlife or humans.
• Material shall be relatively free (<1 % by dry weight) of inert or foreign man made materials.
• Wood chip fill material must also meet the following specifications:
o pH: 5.0 - 8.0
Particle size: 99% passing a 50mm sieve and a maximum of 40% passing a 9.5mm sieve
o Moisture content: 5 60%
Product specifications — compost fill
• Free of any refuse, weeds, contaminants or other materials toxic to plant growth.
• Material shall be relatively free (<l% by dry weight) of inert or foreign man made materials.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-9
Erosion and Sediment Control Guide for Urban Construction
• Stable, humus -like material produced from the aerobic decomposition of organic feedstocks,
composted and cured until maturity.
• Certified to comply with mandatory Ontario Ministry of Environment Conservation and Parks (OMECP)
Compost Quality Standards for Category'AA' or'A' and Canadian Food and Inspection Agency (CFIA)
regulations T-4-93 (CFIA, 1997a) and T-4-120 (CFIA, 1997b).
• Analytical methods acceptable for the eleven regulated metals and the pathogen testing are described
in the Sampling and Analysis Protocol of O. Reg. 267/03. Analytical methods that should be used for
determination of mature compost respiration rate, moisture content, organic matter, foreign matter
content and other relevant parameters are those referenced in the Bureau de Normalization du
Quebec (BNQ) Industry Standard CAN/BNQ 0413-200/2005 "Organic soil conditioners — Composts".
Product performance
• Filter sock products should be capable of removing at least 70% of suspended solids.
• Removal performance should be based on testing by an independent third party.
• Testing should be carried out using American Society for Testing and Materials (ASTM) Standard
D7351-13, which is the "Standard Test Method for Determination of Sediment Retention Device
Effectiveness in Sheet Flow Applications".
Sheet flow applications
• For optimal performance, the upslope area draining to the sock should be stabilized.
Filter socks applied as sediment control for runoff sheet flow - e.g. at site perimeter, along contours of
sloping areas, around storm drain inlets - should be sized such that flows from most storm events will
not overtop the socks.
• Consult with supplier for guidance on selecting appropriate sock diameter based on slope grades and
lengths and the design storm which is meant to be treated by the filter sock. In general, the sizing
should be based on the 5 year design storm, however sizing for a larger design storm may be
necessary where socks are being applied to protect adjacent natural features.
Figure 62-6: Filter socks installed along contours of a slope
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-10
Erosion and Sediment Control Guide for Urban Construction
• Prepare the ground surface prior to filter sock placement to ensure good ground contact. Creating a
shallow depression in which to place the sock can help to improve ground contact.
• Place filter socks on level contours to ensure they receive sheet flows rather than concentrated flows.
• Where filter socks are applied at the base of a slope, a distance of at 1.5 m from the base is
recommended in order to provide adequate space for sediment settling.
• Install socks perpendicular to the sheet flow path and install with ends turned upslope to discourage
water from flowing around the ends.
• For slopes steeper than 2H:1 V, multiple parallel filter socks may need to be installed on the slope to
dissipate runoff energy and reduce the risk of rill erosion.
• Secure filter socks by staking them into place with long wooden stakes driven into the centre of the
sock, or alternatively on both sides of the sock if tearing of the mesh casing is a concern. Where
ground below is paved, secure with heavy concrete blocks or other appropriate means.
• Stakes should be driven into the ground at least 20 cm and extend above the height of the sock.
• Stakes should be placed at regular intervals as needed to secure the sock, with intervals varying
based on the sock diameter and the slope of the drainage area. Confirm appropriate spacing with
supplier.
• Consult with supplier to confirm recommended staking procedures, including staking depths and stake
placement.
Concentrated flow applications:
• Filter socks can be used as sediment control check
dam structures to treat concentrated flows in small
open construction site channels like interceptor
swales (Figure 132-7).
• For use of filter socks as check dams, consult with
supplier for guidance on selecting appropriate sock
diameter based on the design storm to be treated
by the filter sock. In general, the sizing should be
based on the 5 year design storm, however sizing
for a larger design storm may be necessary where
there is a low tolerance of risk of failure.
Treatment of larger flow volumes should be
addressed by selecting the largest sock diameter
that is recommended for the swale and reducing
the spacing interval between socks. Stacking of
socks may also help increase capacity but should be decided on based on supplier guidance.
Figure 132-7: Filter socks installed in a swale
Spacing of filter socks in the swale is based on the swale gradient and anticipated flows. Consult with
supplier for guidance on optimal spacing along the swale.
• Prepare the ground surface prior to filter sock placement to ensure good ground contact. The sock
should be pressed in to the ground during installation. Creating a shallow depression in which to place
the sock can help to improve ground contact.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-11
Erosion and Sediment Control Guide for Urban Construction
• The filter sock should be installed in the swale in a U -shape with ends pointed slightly upslope to
encourage water to pond and — during large events — overtop the sock in the middle rather than
around the sides. The sock should be long enough to extent to the top of the swale.
As a minimum, stake into place in the centre and at both ends. To avoid damage to the casing, stakes
can instead be placed on either side of the sock to create a brace. Stakes should be driven into the
ground at least 20 cm and extend above the height of the sock.
• For best results, swales in which filter socks are installed should be stabilized.
Inspection and maintenance
• Inspect all filter socks weekly, and before and after significant rainfall (see definition in Section 10.1.2)
or snowmelt events, and keep a record of the inspection.
• Look for any signs of erosion and areas where water is undermining the sock and consider how
positioning, ground contact or flow rates can be adjusted to prevent continued undermining.
• Inspect positioning and placement of filter socks to ensure they haven't shifted substantially. Re-
position and re -stake as needed.
• Where flows are exceeding the retention capacity of the sock (e.g. frequent overtopping, water flowing
around check dams), re -consider filter sock diameters used, add additional socks (for swale
applications) or stack socks to create a higher barrier.
• Where socks continue to fail on an ongoing basis, consider replacing with an alternative sediment
retention device. If failure is a result of concentrated flows being directed to socks being applied for
sheet flow control, consider re -designing surface water flow paths to reduce volumes being directed to
the problem area.
• Sediment and/or debris accumulation behind socks should be removed before it reaches
approximately 30% of the sock height.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact. Higher priority should be assigned
to repair of filter socks installed upgradient of natural features.
Decommissioning
• Remove and properly dispose of accumulated sediment.
• Where desired, and if fill material is not contaminated, socks may be cut open so that fill can be
used onsite as mulch for restoration works.
• Remove and dispose of any non -biodegradable material.
• Where socks will be seeded and left as a permanent part of the landscape (e.g. in restoration
areas) ensure it is seeded with a weed -free, native seed mix. In these instances, only socks
with a biodegradable casing should be used.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-12
Erosion and Sediment Control Guide for Urban Construction
NATURAL FIBRE LOGS
(a.k.a. Natural fibre wattles)
Natural fibre logs are a category of sediment control devices encompassing several products that are, like
filter socks, applied for sediment removal from sheet flow or concentrated flows in swales. By decreasing
flow velocities they promote gravitational settling of suspended sediments and help reduce runoff
erosivity. They differ from filter socks in their material composition and the fact that they are pre-
fabricated and not typically filled onsite. They are composed of various biodegradable natural fibres and
are typically uniform throughout. Lengths and diameters vary according to the product type and
manufacturer. Examples of natural fibre logs / wattles commonly used for ESC include:
• Coir logs I Coconut fibre encased in a coconut fibre twine netting.
• Straw logs I Agricultural straw typically encased in a tubular synthetic netting
• Wood fibre logs I Wood excelsior fibre (wood slivers) logs, typically encased in a tubular synthetic
netting.
Figure B2-8: Natural fibre logs
Application
Natural fibre logs can be used in a variety of sediment control applications depending on their diameter,
length and how they are placed/positioned. Common sediment control applications of logs include:
• As flow interruption on level and sloped areas where they are applied along contours,
perpendicular to runoff sheet flows;
• At the base of slopes, at a recommended distance of at least 1.5 m from the based in order to
provide adequate space for sediment deposition;
• Along the site perimeter in areas of sheet flow;
• Perpendicular to channelized flow in swales and ditches where they function as check dams;
• Around storm drain inlets receiving sheet flows;
• At the base of topsoil stockpiles;
• Around sediment bags as part of a dewatering treatment train;
• During frozen conditions in place of sediment fence that cannot be trenched in; and
• Any other areas where it is necessary to dissipate flow velocities and pond water to promote
sediment settling.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-13
Erosion and Sediment Control Guide for Urban Construction
Design and installation
Product specifications
• Biodegradable and non -biodegradable casings are available depending on the product and intended
application. Where logs are being used for permanent stabilization, particularly for construction
projects in natural water features, biodegradable casing can be a useful option. Confirm casing life
span with the product supplier.
• Fibre material should be free of any refuse, weeds, contaminants or other materials toxic to plants,
wildlife or humans. It should also be relatively free (<1 % by dry weight) of inert or foreign man made
materials.
Product performance
• Confirm removal efficiency of any natural fibre log product prior to applying it on the site. It is
recommended that products are selected that can demonstrate sediment removal efficiency >_ 70%
based on testing by an independent third party. Where this removal efficiency cannot be verified, the
products should only be used in low risk applications, and not applied as the primary barrier protecting
an adjacent natural feature.
Sediment retention testing should be carried out using American Society for Testing and Materials
(ASTM) Standard D7351-13, which is the "Standard Test Method for Determination of Sediment
Retention Device Effectiveness in Sheet Flow Applications".
Sheet flow applications
• For optimal performance, upslope area draining to the log should be stabilized, particularly if the
application is on a slope.
• Logs applied as sediment control for runoff sheet flow - e.g. at site perimeter, along contours of
sloping areas, around storm drain inlets - should be sized such that flows from most storm events will
not overtop the logs.
• Consult with supplier for guidance on selecting appropriate log diameter based on slope grades and
lengths and the design storm which is meant to be treated. In general, the sizing should be based on
the 5 year design storm, however sizing for a larger design storm may be necessary if logs are being
applied to protect adjacent natural features.
• Prepare the ground surface prior to log placement to ensure good ground contact. Creating a shallow
depression in which to place the log can help to improve ground contact.
• Place logs on level contours to ensure they receive sheet flows rather than concentrated flows.
• Where logs are applied at the base of a slope, a distance of at 1.5 m from the base is recommended in
order to provide adequate space for sediment settling.
• Install logs perpendicular to the sheet flow path and install with ends turned upslope to discourage
water from flowing around the ends.
• For slopes steeper than 2HA V, multiple parallel logs may need to be installed on the slope to dissipate
runoff energy and reduce the risk of rill erosion.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-14
Erosion and Sediment Control Guide for Urban Construction
• Secure logs by staking them into place with long wooden stakes driven into the centre, or alternatively
on both sides if tearing of the casing is a concern. Where ground below is paved, secure with heavy
concrete blocks or other appropriate means to ensure good ground contact and discourage shifting.
• Stakes should be driven into the ground at least 20 cm and extend above the height of the log.
• Stakes should be placed at regular intervals as needed to secure the log, with intervals varying based
on the sock diameter and the slope of the drainage area. Confirm appropriate spacing with supplier.
• Consult with supplier to confirm recommended staking procedures, including staking depths and stake
placement.
Concentrated flow applications:
• Natural fibre logs can be used as sediment control check dam structures to treat concentrated flows in
small open construction site channels like interceptor swales.
• For use of logs as check dams, consult with supplier for guidance on selecting appropriate log
diameter based on the design storm to be treated. In general, the sizing should be based on the 5 year
design storm, however sizing for a larger design storm may be necessary where there is a low
tolerance of risk of failure.
• Treatment of larger flow volumes should be addressed by selecting the largest log diameter that is
recommended for the swale and reducing the spacing interval between logs. Stacking logs may also
help increase capacity but should be decided on based on supplier guidance.
• Spacing of logs in the swale is based on the swale gradient and anticipated flows. Consult with
supplier for guidance on optimal spacing along the swale.
• Prepare the ground surface prior to device placement to ensure good ground contact. The log should
be pressed in to the ground during installation. Creating a shallow depression in which to place the log
can help to improve ground contact.
• The log should be installed in the swale in a U -shape with ends pointed slightly upslope to encourage
water to pond and — during large events — overtop the log in the middle rather than around the sides.
The log should be long enough to extent to the top of the swale.
• As a minimum, stake into place in the centre and at both ends. To avoid damage to the casing, stakes
can instead be placed on either side of the log to create a brace. Stakes should be driven into the
ground at least 20 cm and extend above the height of the log.
• For best results, swales in which natural fibre logs are installed should be stabilized.
Inspection and maintenance
Inspect all logs weekly, and before and after significant rainfall (see definition in Section 10.1.2) or
snowmelt events, and keep a record of the inspection.
Look for any signs of erosion and areas where water is undermining the log and consider how
positioning, ground contact or flow rates can be adjusted to prevent continued undermining.
• Inspect positioning and placement of logs to ensure they haven't shifted substantially. Re -position and
re -stake as needed.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-15
Erosion and Sediment Control Guide for Urban Construction
• Where flows are exceeding the retention capacity of the log (e.g. frequent overtopping, water flowing
around check dams), re -consider log diameter used, add additional logs (for swale applications) or
stack them to create a higher barrier.
• Where logs continue to fail on an ongoing basis, consider replacing with an alternative sediment
retention device. If failure is a result of concentrated flows being directed to logs being applied for
sheet flow control, consider re -designing surface water flow paths to reduce volumes being directed to
the problem area.
• Sediment and/or debris accumulation behind logs should be removed before it reaches approximately
30% of the log height.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact. Higher priority should be assigned
to repair of logs installed upgradient of natural features.
Decommissioning
Remove and properly dispose of accumulated sediment.
Where desired, and if fill material is not contaminated, some types of logs may be cut open so
that fill can be used onsite as mulch for restoration works.
. Remove and dispose of any non -biodegradable material.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-16
Erosion and Sediment Control Guide for Urban Construction
ROCK CHECK DAMS
Rock check dams are flow interrupters applied across
low flow construction site conveyance channels to
reduce flow velocities and thereby decrease the
erosivity of the water and promote sediment settling.
These temporary dam structures are constructed from
granular material and geotextile fabric. They are
applied in series at intervals determined based on the
gradient of the conveyance channel.
Due to their limited capacity to pond water, they are
ineffective at causing settling of fine particles. Other
products that are also used as check dams are filter
socks and natural fibre logs or wattles.
Application
Figure 132-9: Rock check dam
• Perpendicular to flows in low flow conveyance channels on construction sites (e.g. interceptor swales).
• Particularly important in long or steeply sloped (31HI:1 V or steeper) channels.
• In any concentrated flow path where flow interruption for erosion prevention or sediment settling is
needed.
. Never installed in natural watercourses or other natural water features.
Design and installation
While check dams can be composed of other products and materials (e.g. filter socks, logs), only rock
check dams are discussed in this section. Spacing guidance provided is applicable to other types of
check dams.
Rock check dams should be constructed with the following three layers:
Layer Material Thickness W Notes
Bottom Granular 50 mm diameter stone
material stacked 45 cm high
o Trench in at upstream end extended
Middle non -woven n/a beyond the check dam anchor to form an
geotextile underlying "spill apron'
o Extend from the conveyance channel
Granular 150 mm diameter stone invert to the top of the bottom layer
Top material in a layer z 10 cm
o Form a spillway 0.3 m below the top of the
drainage ditch to prevent outflanking
• Construct check dam to create upstream gradient of 2H:1 V, downstream gradient of 5 4H:1 V and
centre of the dam 5 1.0 m high
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-17
Erosion and Sediment Control Guide for Urban Construction
• Avoid undermining by making the outer sides approximately 0.5 m higher than the center and notch
the center (- 15 cm deep) to concentrate flow in low area
• Refer to Ontario Provincial Standard Drawings in Figures 132-10 and 62-11 for depiction of rock check
dam designs in V -notch and flat bottom conveyance channels, respectively.
• Place multiple dams in series along long or steeply sloped (3H:1 V or steeper) channels.
• Space check dams such that top of the middle (spillway) of each downstream check dam at the same
elevation as the base of the previous dam.
• Ensure erosion control measures are applied in the area draining to the conveyance channel in order
to minimize sediment loads to the channel. Ensure the flows from the channel are conveyed to a
sediment control measures (e.g. sediment trap) for additional sediment removal as needed.
Inspection and maintenance
Inspect weekly, and before and after significant
rainfall (see definition in Section 10.1.2) or
snowmelt events, and keep a record of the
inspection.
Look for any signs of erosion and areas where
water is undermining the check dam and
consider how spillway construction or flow rates
can be adjusted to prevent continued
undermining.
Ensure check dams remain structurally sound.
Replace and regrade the stone as required to
maintain its shape.
• Where erosion is observed and stabilization measures are absent or inadequate, consider adding
stabilization measures.
• Determine whether high flow rates are causing excessive erosion and if so, consider reducing the size
of the area draining to the swale, or re -grading the swale to a flatter slope.
• Sediment and/or debris accumulation behind the check dam should be removed before it reaches
approximately 30% of the device height.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
When conveyance channel is no longer in use, remove and properly dispose of sediment,
granular material and geotextile.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-18
Mchor tr
Limits of
geotextile
At
Erosion and Sediment Control Guide for Urban Construction
Direction of flow
PLAN
SPILLWAY
JA
•r ••
r
SECTION A -A
0
o' Rocker c,
NOTE: SECTION B—B
A All dimensions are in millimetres unless otherwise shown.
TEMPORARY
ROCK FLOW CHECK DAM
V—DITCH
if flow
L
Trench shall backfilled
and 'compacted
300mm min
of geotextlle in trench
— 200
Nov 2015 1 Rev 121trey„
-
OPSD 219.210
Figure B2-10: Ontario Provincial Standard Drawing (Nov. 2015) for temporary rock check dam in a
v -shaped conveyance channel
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-19
y
ISO r spillwaIII
I
/ Geatextile
Direct
0
o' Rocker c,
NOTE: SECTION B—B
A All dimensions are in millimetres unless otherwise shown.
TEMPORARY
ROCK FLOW CHECK DAM
V—DITCH
if flow
L
Trench shall backfilled
and 'compacted
300mm min
of geotextlle in trench
— 200
Nov 2015 1 Rev 121trey„
-
OPSD 219.210
Figure B2-10: Ontario Provincial Standard Drawing (Nov. 2015) for temporary rock check dam in a
v -shaped conveyance channel
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-19
Limits of
geotextile
At
Erosion and Sediment Control Guide for Urban Construction
Va n
SPILLWAY
SECTION A—A
"Oi;
Erosion and Sediment Control Guide for Urban Construction
STORM DRAIN INLET PROTECTION
The protection of storm drain inlets from sediment laden runoff can be achieved using various practices
applied around or under the storm drain inlet. Protecting inlets is an important way to prevent high
sediment loads to ponds, which in tum results in improved pond performance and less frequent sediment
removal required in ponds and catchbasins. Flows entering storm drains may also be conveyed directly
to a receiving water system without passing through an end -of -pipe control, in which case the necessity of
reducing sediment entry into the storm drain is even greater.
The types of sediment control measures often applied to block sediment entry into these inlets are
sediment retention barriers and filters. By applying these types of measures, the inlet still receives runoff
but sediment is removed as the water flows in from the drainage area.
Figure 132-12: Storm drain inlet protection measures
Application
• Applied on all operational storm drain inlets on the site
• Applied at grade around or overtop the inlet or applied below grade inside a storm drain
• For drainage areas >1 ha, multiple barriers are needed and the inlet protection device should not be
the only ESC measure installed.
Design and installation
Install immediately once the connection of the storm sewer
system is live.
Determine the drainage area in order to properly size the inlet
protection device.
• Common types of devices that provide effective inlet protection
are filters in a bag/sack configuration that hangs below the inlet
grate, sediment retention barriers that are applied around the
outside of the inlet, and filter pads that are placed over the inlet
grate. Some examples are shown in Figure 132-12.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-21
Erosion and Sediment Control Guide for Urban Construction
• Refer to manufacturer specifications (for the device being installed) to determine sizing and
appropriate installation techniques specific to the product.
• Ensure there's structural reinforcement to prevent movement or shifting of the protection. For filter
socks used for inlet protection, ensure sock is staked into place.
• Ensure that any inlet inserts have handles so that they can be easily removed with machinery and
install so that the handles are easily accessed.
• Place any structural reinforcement used on the inside of the sediment retention device
• For protection devices installed around or above the inlet, ensure that it is not completely blocking the
inlet grate and preventing flow through. Filters applied overtop of the inlet, like coir inlet filter pads, are
an exception as they allow flow through.
• The use of geotextile fabric placed under the inlet grate as a standalone inlet protection measure is
discouraged due to the frequent cleaning required in order to maintain effectiveness.
• For areas with heavy vehicle traffic, select below grade inlet protection in order to minimize risk of
device damage and need for frequent repairs.
• Consider excavating the area around the inlet or installing a rock/gravel jacket around or in front of the
inlet to allow more opportunity for ponding of water (see Figures 132-13 and 62-14). This should
encourage localized ponding in the immediate area of the inlet, not flooding into the roadway or other
adjacent areas.
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall
(see definition in Section 10.1.2) or snowmelt events, and
keep a record of the inspection.
• Look for any signs that runoff is undermining or otherwise
bypassing the sediment control measure and repair as
needed.
• Remove any sediment accumulation that has reached
approximately 30% of the height of the sediment retention
barrier and ensure proper disposal.
• For below grade installations, like filter fabric sacks/bags,
ensure that it is cleaned out at the frequency specified by the manufacturer/supplier. The sediment
accumulation threshold at which clean out is needed may vary from one product to another, but is
normally 50% accumulation. If there are signs of clogging causing impeded flow through and flooding,
clean out immediately.
• Clean and/or replace the device if there is any evidence of clogging significantly impeding flow through
and leading to flooding.
• Look for any signs of structural damage to the device. If it is being damaged due to vehicle traffic,
consider substituting with a below grade device.
• If using granular material, periodically rake to reshape and remove and replace any granular material
overloaded with sediment.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-22
Erosion and Sediment Control Guide for Urban Construction
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
• Ensure the inlet grate is not being unintentionally blocked by the protection device.
Decommissioning
• Remove accumulated sediment.
• Carefully remove inlet inserts by the handles. Remove all components of the inlet protection devices
so as to minimize disturbance of the area and accidental release of sediment into the inlet.
EXCAVATED DROP INLET
SEDIMENT TRAP
SEDIMENT -LADEN RUNOFF
r f II�
IL. Ii.=.moi-
FLOW
MAX. SLOPE 2H:1V
STORM WATER WITH
LARGER PARTICLES
REMOVED
DRAIN INLET
WEEP
HOLES
FOR
DEWATERING
Figure 1132-73: Excavated drop inlet structure for trapping sediment
LARGER PARTICLES
SETTLE OUT
DEPTH BELOW
TOP OF INLET
MIN. 1'- MAX. 2'
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-23
Erosion and Sediment Control Guide for Urban Construction
BLOCK AND GRAVEL PROP INLET
SEDIMENT TRAP
WIRE SCREEN
GRAVEL
NINE:.
USE CLEAN GRAVEL, 1/2" TO 1" DIAMETER
RUNOFF OVERFLOW
WITH WATER
SEDIMENT
WIRE SCREEN
TREATED WATER
L DROP INLET
WITH GRATE
sEDImt T
Figure 132-14: Gravel jacket installed around drop inlet.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-24
Erosion and Sediment Control Guide for Urban Construction
SEDIMENT (DEWATERING) BAG
A sediment bag is a large geotextile bag that is
used to filter sediment laden water from a
pump hose. They are commonly applied to
treat water during construction site dewatering
activities. As water is pumped through the bag,
sediment is removed through filtration and
gravitational settling caused by energy
dissipation. The bag also disperses the water
from the pump hose, preventing erosion
typically associated with concentrated flows.
While the apparent opening size (AOS) of the
geotextile fabric determines the maximum size
of particle is filtered out, a significant amount
of sediment removal is attributed to the
Figure B2-15: Sediment bag surrounded by filter sock
reduction in flow velocity and associated gravitational settling.
Application
• Suitable anywhere dewatering of sediment laden water is necessary to create a dry work area, and
particularly where space is limited.
• Examples: dewatering of an isolated in stream work area, tunneling, excavating for a basement, or
drawing down a sediment control pond to allow for maintenance.
• Applied where flow dispersion is needed to prevent erosion, as the bag receives concentrated water
from the hose and disperses.
. Best used as a dewatering treatment train (see Figure B216- and B2-17).
Design and installation
• Sediment bags are manufactured in various sizes and are pre -sealed on all sides except for a small
opening on one end, adequately sized for a dewatering hose. Refer to the manufacturer's
specifications for capacity and sizing details as well as proper clamping procedure.
• Select sediment bag constructed from durable, non -woven UV stabilized geotextile with a high puncture
and tear resistance.
• Ensure the manufacturer's specified water flow rate and apparent opening size are appropriate for the
planned flow rates and the expected particle size distribution of the water being treated.
• Bag should be located at least 30 m from any natural water feature in order to minimize risk of a
sediment spill into the feature if the bag ruptures. Where siting 30 m away is not possible, consult with
the local CA for guidance on potential laydown areas and any additional measures (e.g. dewatering
treatment train setup) and monitoring efforts that can be applied to mitigate risk.
• Bag should be located so that it is easily accessed for maintenance and removal purposes and so that
water discharged from the bag doesn't cause or aggravate erosion.
• Place bags on a relatively flat surface to ensure the bag doesn't shift downslope.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-25
Erosion and Sediment Control Guide for Urban Construction
• Place on stabilized ground (e.g. grassed surface, rock pad) and underlain with non -woven geotextile
fabric to prevent erosion under and around the bag. Installing a rock pad or wood pallet below the bag
can be beneficial as it make allow for better drainage out of the bottom of the bag.
• As part of a treatment train or multi -barrier approach to dewatering through a sediment bag, install
a sediment control barrier such as a filter sock around the bag in order to provide more opportunity for
sediment settling. See dewatering treatment train shown in Figures B2-16 and 62-17.
• Ensure the planned flow path from the bag to the ultimate receiver is stable, and where it is not, create
a stable flow pathway to ensure the discharge doesn't cause erosion.
• During freezing conditions keep the bag elevated, such as with a rock pad, to prevent it from freezing
to the ground and tearing when being lifted away for removal.
Inspection and maintenance
• Inspect daily during active pumping into the bag to ensure that there are no tears or leaks in the seals
or the bag, and also check that the discharge from the bag is not causing erosion underneath it or
anywhere along the flow path from the bag to the receiver. Keep a record of the inspection.
• Where there is evidence of erosion, re -consider whether stabilization is adequate to protect against
erosion based on the flows coming out of the bag.
• Confirm that the pumps and bag size are continuing to provide the desired level of water treatment.
Where sediment levels in discharged water remain elevated, consider adding or replacing with a
different dewatering practice (e.g. weir tanks) to provide additional sediment removal.
• Inspect bag to determine whether it is full and requires replacement.
• Where the bag is damaged or no longer functioning, cease pumping immediately and replace or repair
components.
• Replace the bag once it's not functioning and/or according to the manufacturer's instructions. If the
flow through rate begins to decline significantly that may indicate the bags is full and requires
replacement. The amount of sediment contained in the bag can also be confirmed once pumping is
ceased and the bag is left to drain.
• Keep additional bag(s) on site so that replacement can be handled quickly when needed.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Allow bag to drain over time until the bulk of the water is gone.
• Remove bag with minimal disturbance to stabilized areas or nearly natural features. The full bag
should never be lifted over a water feature or a person.
• Dispose of or reuse sediment based on its quality and the requirements stated in existing excess soil
policy and legislation.
• Properly disposed of the sediment bag.
• Clean and restore the sediment bag lay down area.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-26
450 mm FILTER SOCK
SECURE FILTER
SOCKS WITH STAKES 1
r DISCHARGE HOSE
SECURE ENDS OF FILTER
FABRIC WITH SAND BAG
OR EQUIVALENT
SECURE FILTER
SOCKS WITH
IS
SECURE ENDS OF FILTER
FABRIC WITH SAND BAG
OR EQUIVALENT
Zv
PUMP
PUMP INLET PLACED IN O
A FILTERED SUMP
CONDITION USING
CLEAN STONE AND
FILTER FABRIC. A FISH
SCREEN MAY BE
REQUIRED IF THERE IS
POTENTIAL FOR FISH
OR OTHER AQUATIC
WILDLIFE ENTRAPMENT
Erosion and Sediment Control Guide for Urban Construction
APPROPRIATELY WEIGHTED NON -WOVEN FILTER
FABRIC OVERLAP AT TOP OF FILTER SOCK
450 mm FILTER SOCK SECURE FILTER
�-�
SEDIMENT SOCKS WITH STAKES
F(DEWATERING)BAG y,
WOOD PALLET/SKID
UNDER SEDIMENT BAG
SECTION VIEW
m"in"i i✓i
SECURE ENDS OF FILTER
FABRIC WITH SAND BAG
OR EQUIVALENT
� \ 1
•\• OF
SEDIMENT \.
(DEWATERING) BAGEffwffrTnXInF1I§ •
111
CD
O O O O
WOOD PALLET/SKID UNDER SEDIMENT BAG
REMOVE AND PROPERLY DISPOSE OF SEDIMENT THAT
HAS ACCUMULATED TO 3D% OF SOCK HEIGHT
PLAN VIEW
THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL
RES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
ITRCA ESC DESIGN DETAIL IscALE.TREv (DATE
N.S. 1 MR
T^mmn DRAWING TITLE DWG NO
Conservation
A°I" fiq DEWATERING TREATMENT TRAIN 01
DISCLAIMER ` REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING_ PLEASE
USE IT FOR F, 'LY
Figure 62-16: Dewatering bag treatment train (unfrozen conditions)
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-27
DEWATERING HOSE
(SECUREDMEIGHTED
TO KEEP ON PLACE)
SEDIMENT
DEPOSITION
AREA
Erosion and Sediment Control Guide for Urban Construction
APPROPRIATELY WEIGHTED
NON -WOVEN FILTER FABRIC
OVERLAP AT TOP OF FILTER SOCK
WATER
SECURE ENDS OF \
FILTER FABRIC WITH REMOVE AND PROPERLY DISPOSE OF SEDIMENT
EQUIVAALENTLENT
SANDTHAT HAS ACCUMULATED TO 30% OF SOCK HEIGHT
SECURE ENDS OF FILTER FABRIC
WITH SAND BAG OR EQUIVALENT
SECURE FILTER _
SOCKS WITH STAKES
0
DEWATERING HOSE
PUMP
IN
PUMP INLET PLACED0
A FILTERED SUMP
CONDITION USING
CLEAN STONE AND
O
FILTER FABRIC. A FISH
SCREEN MAY BE
REQUIRED IF THERE IS
POTENTIAL FOR FISH
OR OTHER AQUATIC
WILDLIFE ENTRAPMENT
w
SECTION VIEW
_ STAKES SECURING
FILTER SOCK
SEDIMENT 450 mm
DEPOSITION FILTER SOCK
AREA
J/Z,�/ZV /.moi \
SECURE ENDS OF FILTER
FABRIC WITH SAND BAG
OR EQUIVALENT
6 m (MIN.)
PUMPED WATER
(AREA SHALL FIT TO
THE PUMP CAPACITY)
SEDIMENT DEPOSITION AREA
CD CD O
REMOVE AND PROPERLY DISPOSE OF SEDIMENT THAT
HAS ACCUMULATED TO 30% OF SOCK HEIGHT
N
N
PLAN VIEW
THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL
RES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
SCALE REV DATE
TRCA ESC DESIGN DETAIL N.T.S. 1 JMARCH 2119
� 4 Cor ervatl"-Om DRAWINGTITLE
DEWATERING TREATMENT TRAIN
02
DISCLAIMER'. TORONTO AND REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE
USE IT FOR REFERENCE ONLY
Figure B2-17: Dewatering bag treatment train (frozen conditions)
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-28
Erosion and Sediment Control Guide for Urban Construction
SEDIMENT TRAP
A sediment trap is a runoff detention area created by constructing an embankment across a runoff
drainage/conveyance feature (e.g. ditch, swale) or by excavating below grade to create a depression. The
purpose of the trap is to detain runoff and provide an opportunity for gravitational settling of sediment.
Sediment traps are typically applied near the end of a treatment train (i.e. end of pipe measure) to provide
sediment removal before water is discharged to the receiver. They are meant to receive flows from
smaller drainage areas — less than or equal to 2 ha — that don't drain to a sediment control pond or other
detention feature.
Application
• At or near the end of a treatment train (i.e. end of pipe) for sediment removal from stormwater (via
detention) before it is discharged offsite.
Typically installed across drainage/conveyance features.
. For drainage areas <_ 2 he that do not drain to another detention feature (e.g. sediment control pond).
Design and installation
• Construct the trap at grade by constructing berms or below grade by excavating.
• Design to provide at least 125 m3 of storage for each hectare of contributing drainage area.
• Construct with stabilization on the bottom and all side slopes. Suitable stabilizations measures for
sediment traps include well-established vegetation with turf reinforcement mats (if needed) or rock
underlain with non -woven geotextile fabric.
• Trap should be designed to be between 1.0 and 2.0 metres deep. Minimum depth recommended is to
avoid re -suspension of previously settled sediment. Maximum depth recommended is for safety
reasons. Where a depth > 2 metres is unavoidable, the local municipality should be consulted to
determine whether the trap needs to fenced off.
• Sediment trap should be <- 20 metres long and the maximum width should be half the length.
• Ensure proper grading of 0.5H: 1V side slopes and compaction to prevent slumping and slope failure.
• Recommended sediment trap side slope grade is 0.5H:1 V
• Sediment trap outlet should be a stable open channel spillway located at the downstream end of the
trap. Spillway construction is critical to prevent failure of the structure during high flows. All
specifications provided by the plan designer should be implemented.
• Construct a check dam structure (rock or filter sock) at the outlet to provide additional detention and
opportunity for sediment settling. Filter socks should be configured to form a pyramid for added
stability and more opportunity for sediment retention. Any check dam structure should be lower in the
centre and extend up the channel slopes to ensure that water leaving the trap flows over the centre of
the check dam rather than around the sides.
• Erosion protection measures should be installed immediately downstream of the spillway outlet.
• Refer to design detail in Figure B2-18 for sediment trap design within a ditch.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-29
Erosion and Sediment Control Guide for Urban Construction
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall (see definition in Section 10.1.2) or snowmelt
events, and keep a record of the inspection.
• Look for any signs of erosion at the inlet, outlet or side slopes. Repair eroded areas by filling in rills,
smoothing out the surface and re -installing or augmenting the stabilization that was in place. Consider
whether the stabilization measures in place are failing due to poor condition or because flows are
higher than anticipated.
• Remove sediment that has accumulated to 50% of the height of the sediment trap.
• Observe and/or analyze (e.g. handheld turbidity testing) sediment trap effluent to assess whether the
trap continues to effectively remove suspended sediment.
• Where effluent turbidity is elevated, consider sediment trap storage capacity and stabilization to
pinpoint reasons for under -performance. Consider adding additional measures upstream (e.g.
ditch/swale stabilization) and/or downstream of the trap to achieve greater sediment removal.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
• Ensure spillway remains structurally sound and repair as needed when damage occurs.
Replace and regrade the stone as required to maintain its shape.
Decommissioning
• When sediment trap is no longer in use, remove and properly dispose of sediment, granular
material and geotextile.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-30
DITCH
(FLAT BOTTOM OR VSHAPED)
TOP OF SLOPE
DIRECTION
OF FLOW B
STABILIZE SIDE SLOPES WITH ROLLED EROSION
CONTROL PRODUCT AND/OR SEEDING
Erosion and Sediment Control Guide for Urban Construction
LLc H
EXCAVATED O O? B DITCH
BASIN �' Z FILTERSOCKS (FLAT BOTTOM OR VSHAPED)
.......... ... CHECK DAM
PLAN VIEW A
mm -300 mm FILTER SOCKS
DIRECTION
OF FLOW
DITCH INVERT 1V
L=20 In MAX
SECTION B -B
2H
1V'7
STABILIZE SIDE SLOPES WITH ROLLED EROSION 1V L
CONTROL PRODUCT AND/OR SEEDING 0.511
1/2 THE LENGTH
SECTION A -A
THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
TRCA ESC DESIGN DETAIL SCALE REV DATE
N.T.S. 1 MARCH 2019
rorano�n3jNl f o DRAWING TITLE DWG NO
Conservatl0n
....... SEDIMENT TRAP IN EARTHEN DITCH 06
DISCLAIMER: TORONTO AND REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFOF
Figure B2-18: Design detail for sediment trap within an earthen ditch
ON THIS DRAWING. PLEASE USE IT FOR REFERENCE ONLY
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-31
Erosion and Sediment Control Guide for Urban Construction
SEDIMENT CONTROL PONDS
(a.k.a. Sediment basins, detention ponds or basins)
A sediment control pond is a large excavated area used to detain construction site runoff and promote
settling of suspended sediment particles. They are wet ponds, which means they are designed to hold a
permanent pool of water and provide additional storage — known as active storage — for detaining
incoming flows. As such they are very similar to stormwater management wet ponds that are built as
permanent detention facilities to treat runoff from developed areas.
Figure B2-19: Sediment control ponds
In addition to removing suspended sediment, sediment control ponds prevent downstream erosion by
releasing water through an outlet structure at a fixed rate over an extended period of time. This protects
downstream features from the erosive impact of storm event peak flows.
Several aspects of sediment pond design determine their capacity to improve water quality and reduce
peak flows. These include permanent pool storage volume, active storage volume, length -to -width ratio,
presence of a forebay or cells, and the location of the inlet and outlet
Sediment ponds are 'end -of -pipe' practices that are typically the final BMP through which stormwater
flows before it is discharged offsite. They receive flows from all the other ESC measures installed in the
contributing drainage area as well as overland flow, often from stripped land areas. As such they are
particularly important components of ESC plans, providing the last line of defense against the release of
excess sediment to natural water features.
Application
• Treatment of runoff from any construction site drainage
areas > 2 ha.
. Applied as an end -of -pipe control.
Design and installation
• Sediment ponds must be constructed prior to any
construction activities except for topsoil stripping and
grading associated with the construction of the pond.
• Once excavation and grading is complete, pond banks
must be compacted and stabilized with vegetation. An
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-32
Erosion and Sediment Control Guide for Urban Construction
RECP may also be needed until vegetation is well established and effectively preventing erosion.
. The maximum recommended contributing drainage area for a sediment pond is 10 ha.
• Consider whether there is a need to construct the pond with a liner to prevent interaction with
groundwater. This is particularly important if there is a downward gradient and hydraulic conductivity
of soils is greater than 10-7 m/s, or if the pond is to be located in a vulnerable area, which may include:
(i) highly vulnerable aquifers, (ii) significant groundwater recharge areas, (iii) wellhead protection area
A or (iv) wellhead protection area B (if the area has a vulnerability score z 8).
Siting
• Install the sediment basin based on topography and in a low area allows the maximum control of
sediment laden runoff from the disturbed areas.
. Consult with local CA if proposed location is the also the location of the ultimate (post -construction)
stormwater management pond.
Pond and forebay design
The following design specifications should be applied in the design and sizing of sediment control ponds
and their forebay areas:
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-33
Design component
I Specifications
Notes
At least one forebay designed as
follows:
• >_ 1 metre deep
• Sized to ensure non-erosive
Submerged berm/turbidity curtain applied across
Forebay / berms
velocities leaving forebay
the width of the pond, half way between the initial
• <_ 33% of permanent pool
forebay berm and the outlet structure.
AND
A submerged berm or turbidity
curtain
• 185 m3/ha provided if length -to -width ratio or
Permanent pool volume
m3 per hectare contributing
drawdown requirements are not met
drain
drainage area
• Confirm volume with local CA
Active storage volume
Z 125 m3 per ha drainage area
Drawdown time
z 48 hours
Length -to -width ratio
>_ 4:1
A baffle may be required to increase length of the
flow path and prevent short circuiting
• Refers to maximum depth (deepest point)
Permanent pool depth
1 — 3 metres
• Minimum depth is applied to avoid re -suspension
of previously settled sediment
• Maximum depth is a safety precaution
• Interior side slopes graded no
steeperthan 4H:1V
Slope grades
• Exterior side slopes graded
no steeper than 2H:1 V
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-33
Erosion and Sediment Control Guide for Urban Construction
Inlet design
• For swale inlets typically in place before site servicing is complete, ensure structural stability and the
application of erosion controls. Options include embedded stone, well established vegetation installed
with turf reinforcement matting, or other hard or soft armoring techniques.
• Ensure stabilization selected will withstand erosive forces of the runoff flowing through the channel
inlet.
• Install flow interruption devices in the swale upstream of the pond in order to dissipate the energy in
the runoff and reduce its erosivity.
• A slope drain or similar structure is recommended to allow runoff to be conveyed down into the pond
with minimal erosion risk.
Outlet design
• Include a perforated riser pipe outlet or approved equivalent to release effluent at a controlled rate.
The riser pipe outlet should be covered with a layer of small clear stone (25 mm — 50 mm) over a layer
of larger (150 mm - 200 mm).
• The orifice in the outlet structure should have a diameter > 75 mm to prevent clogging.
• A vegetated filter strip (10 metres length recommended) should be planted at the sediment control
pond outfall.
• The outfall should be constructed with an animal protection grate and a flow dispersion measure to
prevent erosion.
Emergency spillway design
• Ensure that a stable, open channel emergency spillway is constructed to prevent overtopping or
structural failure during high flows. Installation should adhere to all specifications provided by the ESC
plan designer.
• The spillway must be designed to safely pass the 100 year design storm.
• Stabilize the spillway. Options include embedded stone, well established vegetation installed with turf
reinforcement matting, or other hard or soft armoring techniques.
• Install erosion protection immediately downstream of the spillway, including both ground stabilization
and energy dissipation measures as needed.
Calculations required
The following calculations should be submitted with associated ESC plan drawings and reports:
• Velocity calculations demonstrating that settling velocities can be achieved based on the proposed
design
• Determination of permanent pool and active storage volumes
• Drawdown calculations
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-34
Erosion and Sediment Control Guide for Urban Construction
Inspection and maintenance
• Inspect weekly, and before and after significant rainfall (see definition in Section 10.1.2) or snowmelt
events, and keep a record of the inspection.
• Ensure pond has been constructed prior to any construction activities except for activities associated
with the construction of the pond, such as topsoil stripping and grading.
• Verify that pond and its specific components (i.e. inlet, forebay, berms, outlet, emergency spillway)
appear to be constructed as per detailed drawings in ESC plan.
• Verify stabilization of pond banks and inlet and look for any evidence of erosion. Repair or augment
stabilization measures as needed, i.e. fill rills, re -seed and apply RECP.
• Inspect inlet for signs of excess sediment accumulation and/or large debris. Remove sediment
accumulation in the forebay before it reaches 50% of the forebay storage capacity.
Measure sediment accumulation in the
pond at least once every six months.
Guidance on proper sediment depth
measurement is available in Section 6.1
of the Inspection and Maintenance Guide
for Stormwater Management Ponds and
Constructed Wetlands (TRCA and CH2M,
2016).
Remove sediment accumulation in the
pond when it reaches approximately 30%
of the permanent pool storage volume.
Observe and/or analyze pond effluent Figure 62-20: Sediment removal from a pond
suspended sediment and/or turbidity levels to assess performance. This should be done before and
after significant rainfall and snowmelt events or more frequently as needed. See Chapter 10.0 for
addition guidance ESC performance monitoring.
• Where effluent turbidity is elevated, consider potential reasons for under -performance including:
o Water short circuiting flow path due error in design or implementation
o Erosion from banks or swale inlet
o High sediment loads entering the pond due to inadequate ESC in the contributing drainage area.
o Excessive sediment accumulation in the pond
• Address deficiencies and carry out follow up monitoring to assess whether actions taken have
resulting in pond performance improvement.
• Ensure spillway remains structurally sound and repair as needed when damage occurs.
Replace and regrade the stone as required to maintain its shape.
• For more detailed guidance on pond maintenance, refer to the Inspection and Maintenance Guide for
Stormwater Management Ponds and Constructed Wetlands (TRCA and CH2M, 2016).
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-35
Erosion and Sediment Control Guide for Urban Construction
Decommissioning
• In the case where the sediment control pond is in the location of the ultimate (post -construction) pond,
and construction is complete, accumulated sediment must be removed (and appropriately disposed of)
and the permanent pool storage must be restored to the design level.
Water pumped out of ponds that are being decommissioned should be treated with a sediment control
measure prior to release to the receiving water system. Appropriate sediment removal BMPs for
application during pond dewatering include sediment bags, weir tanks, or treatment trains that may
incorporate these measures. See dewatering protocols (Section 6.4) and BMP details on p. 132-25 and
B2-45 for guidance.
Sediment and liner materials should be removed from the bottom of the pond and properly disposed of
based on sediment quality. Refer to the Inspection and Maintenance Guide for Stormwater
Management Ponds and Constructed Wetlands (TRCA and CI -12M, 2016) for best practices related to
pond sediment disposal I reuse.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-36
SEDIMENT FOREBAY DESIGN AS PER
M.O.E. STORM WATER MANAGEMENT
PLANNING AND DESIGN MANUAL, 2003
2�1
INLET
POND DEPTH 2e '
MAXIMUM 3M
Erosion and Sediment Control Guide for Urban Construction
TO �XISTINO /
MUM W11. GRAD
__------ -
MINIMUM 4-L LENGTH TO WIDTH RATIO
2QN9_@OT TOM
4-11 GRADE
TION WHERE
EMERGENCY
SPILLWAY
Figure 132-21: Plan view depiction of sediment control pond design specifications
2ND FOREBAY OR TURBIDITY
CURTAIN TO BEPLACED HALF
WAY BETWEEN SEDIMENT FOREBAY
BERM AND CUTLET STRUCTURE
HICKENBOTTOM
RISER OUTLET
POND OUTLET
MIN LOM
VEGETATIVE
a
FILTER STRIP
EROSION
PROTECTION
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-37
Erosion and Sediment Control Guide for Urban Construction
WEIR TANKS
(a.k.a. dewatering tanks)
Weir tanks can be used on construction sites to detain stormwater runoff and promote sediment settling.
Compared to other detention measures that are built on site, like basins or sediment traps, tanks can be a
convenient and small footprint solution for short duration dewatering activities, since they are readily
transported on and off site. The internal structure of the tank includes bottom weirs to help detain water
and dissipate energy to aid in the settling of suspended solids.
Figure 132-22: Weir tanks
Application
Weir tanks are can be used alone or as the settling component of a larger water treatment system. Tanks
can be particularly useful when:
• Sediment removal is required for short-term pumping / dewatering activities, such that taking the time
to construct a BMP with similar sediment removal capacity (e.g. sediment control pond) would be
impractical;
• Site specific requirements dictate more stringent effluent water quality standards than are achievable
when applying other sediment control BMPs used during dewatering (e.g. sediment bags); or
Planned pumping rates are high and require a large capacity BMP
Design and installation
• Tank selection should be done in consultation with the system supplier and determined based on
consideration of the anticipated pump rates and the target detention time and sediment removal
efficiency. Sediment particle size distribution should also be considered, since finer particles are more
difficult to settle.
• Determine the location where the system will be placed based on consideration of the following:
o Stability of the ground surface.
o Accessibility by vehicles that will be transporting the tank.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-38
Erosion and Sediment Control Guide for Urban Construction
o Distance from any natural water feature (z 30 m recommended where possible)
• The rate at which effluent is discharged from the tank should be based on the capacity of the
downstream receiving area to accommodate those flow rates. Ensure the system discharges to a well
stabilized area, with flow dispersion and interruption devices placed as needed. Consider the entire
flow path to the receiver and apply stabilization measures along the path as needed.
• For a multi -barrier approach, add a sediment control barrier around the area where the active
treatment system is placed. This will provide added protection in the event of any pipe leaks.
• Keep a spill response kit near the active treatment system and ensure staff are aware of spills
response and reporting protocols.
Inspections and monitoring
• Inspect daily during active use of the system and keep a record of the inspection.
• Carry out routine inspection of sediment accumulation in the tank to determine when clean out is
required and ensure previously settled sediment is not becoming re -suspended.
• Carry out routine effluent monitoring to verify performance and ensure that effluent quality meets any
applicable standards. If performance declines, consider whether pump rates need to be adjusted or
accumulated sediment needs to be removed. Consider enhancing removal efficiency through the use
of a polymer flocculant based system.
• Ensure system is monitored daily during active pumping and that staff overseeing the use of the
system have a thorough knowledge of proper operation.
• Where there is evidence of erosion at the discharge point or along the flow path downstream of the
discharge locations, re -consider whether stabilization is adequate to protect against erosion based on
the flows.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-39
Erosion and Sediment Control Guide for Urban Construction
POLYMER FLOCCULANTS
Polymers flocculants have been used for in various
industries for decades — including food processing,
aquaculture and mining — as a means of facilitating
the separation of solids and liquids. Polymer
flocculants are chemicals that adsorb onto
suspended particles to form bridges between them,
as shown in Figure B2-23. As particles are bound
together they form larger aggregate masses, which
are then more readily removed from suspension
through gravitational settling or filtration (Figure 62-
24).
Polymer flocculants can be used on construction
projects to enhance removal of suspended sediment,
particularly in situations where the sediment -laden
water cannot be detained long enough to allow
particles to settle.
PAM Anionic
Polymer Chain
Ion bridges
between chains
Chain bridging
between charged
soil particles
Figure B2-23: Interaction between anionic PAM and soil
particles in the presence of calcium (Orts et al., 2002).
There are various polymer flocculants currently used to promote solid -liquid separations, but only some
are suitable for ESC applications. Polymers used for ESC or other environmental applications should be:
• non-toxic to humans and other terrestrial and aquatic organisms;
• effective at reducing water turbidity and/or preventing soil erosion;
• practical for use in the outdoors; and
• otherwise safe.
Two of the most common construction runoff clarification flocculants are polyacrylamides and chitosan.
Polyacrylamides (PAM) I PAMs are synthetic organic
polymers created through the polymerization of acrylamide.
PAMs used in construction stormwater clarification
applications are water-soluble (having a linear chain
structure) and negatively charged (anionic). Cationic
(positively charged) PAMs are also effective flocculants but
exhibit a higher toxicity to aquatic organisms than anionic
forms. Linear anionic PAM products are typically available
in the following three forms: (i) powders used for dry
application or for mixing with water, (ii) emulsions that can
be added to water, often as part of a hydroseed mix, and
(iii) blocks which dissolve into flowing water.
Figure B2-24: Turbidity reduction in water
sample following treatment with a flocculant.
B f th I ft d ft th ht
Chitosan I Chitosan is a cationic biodegradable a ore on e e an a er on erg; .
biopolymer that is produced from a renewable source — chitin — which is found mainly in the exoskeletons
of crustaceans and insects and the cell walls of certain fungi. Chitosan is biodegradable and derived from
a renewable source. While chitosan is widely used in many commercial products and ingestible dietary
supplements, its cationic nature may mean higher toxicity to aquatic organisms relative to an anionic
polymer. While toxicity varies among products, in practice chitosan is often used in ways that eliminate
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-40
Erosion and Sediment Control Guide for Urban Construction
the risk of having residual chitosan in treated water released to natural features. One common example
is chitosan-enhanced sand filtration, where sand filters are used at the end of a treatment train (often an
active treatment system) as a polishing step which removes any flocculated sediment that remains in
suspension. Chitosan residual can also be tested with portable kits that can be useful where effluent
discharges directly to a natural feature.
Application
Polymer flocculants are best applied to enhance sediment settling when:
• Treatment is required for short-term pumping activities, such that taking the time to construct a BMP
with similar sediment removal capacity (e.g. sediment control pond) would be impractical;
• A high sediment removal rate is required but the area available for treatment is too small to
accommodate a sediment control pond;
• Water being treated contains a large proportion of fine sediments (e.g. clay) since these are difficult to
settle out of suspension
• Water being treated contains certain contaminants of concern that require removal through specific
chemical and/or physical processes;
• Site specific policy requirements define more stringent effluent water quality standards than are typical
and/or achievable when applying other conventional BMPs; or
• Other conventional sediment control measures have failed to achieve the necessary removal rates.
Design and installation
Product selection
• Selecting a flocculant and determining dosing rates should be carried out in consultation with the
product supplier. Dosing rates vary according to the dosing method, product type and its physical form.
• Selection of a flocculant should be based on demonstrated sediment settling performance during
bench scale testing using soil and water samples from the site.
• For any flocculants to be used, toxicity data must be available to demonstrate that the product is non-
toxic at the intended dosing/application rate. Evidence of this should be available in the product's
Material Safety Data Sheet (MSDS) and/or toxicity reports. As a minimum, acute and chronic toxicity
data, based on testing by an accredited third parry, should be available for the following aquatic
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-41
Erosion and Sediment Control Guide for Urban Construction
organisms: fathead minnow (Pimephales promelas), rainbow trout (Oncorhynchus mykiss) and water
flea (Daphnia magna). The LC -50 concentrations (the concentration of polymer that is lethal to 50% of
the sample population) listed in toxicity reports should significantly exceed the maximum anticipated
release rate of the product based on the intended use.
The use of any cationic polymer flocculant for treatment of construction runoff that is being discharged
to a natural feature is subject to approval by the local municipality and CA and other agencies involved
in regulated discharges from the site. Approval is based on
product toxicity data and the intended application method
and dosing rate.
• Ensure product labelling and/or packaging is available for
the flocculant, which specifies the following:
o product expiry date
o use and maintenance instructions
o safe handling, storage and disposal information
• Any applications of anionic PAM -based products should
meet the criteria detailed in Anionic Polyacrylamide
Application Guide for Urban Construction in Ontario (TRCA,
2013).
System design
• Any flocculant -based construction runoff treatment system should be designed by a qualified individual
with knowledge of, and experience with, polymer flocculants.
• A construction runoff clarification system incorporating a polymer flocculant can come in a variety of
configurations — such as an open ditch / channel or an active treatment system with tanks — but should
always be designed to provide opportunity for the following key system functions:
o Dosing: The flocculant is dissolved into the water being treated at a dosing rate determined based
on manufacturer guidance. The dosing rate will vary based on several factors, such as product,
type, the flow rate of water and water temperature.
o Mixing: Physical mixing of the flocculant and water will increase opportunity for sediment particles
to react and bind together. Passive mixing can be accomplished by allowing the water to flow
through barriers that will create turbulence (e.g. rock check dams, baffles). Mixing time required
should be determined based on manufacturer guidance.
o Settling: Providing an area for sediment settling following mixing ensures that flocs (i.e.
agglomerated particles) will settle out within the treatment system rather than in the downstream
area or feature receiving the treated discharge.
o Final filtration: Filtering effluent at the end of the system can provide assurance that flocs that have
not settled out of suspension are removed before the effluent is discharged to the receiving area.
Suitable filters may include geotextile fabric (e.g. sediment bag) or sand filters depending on the
polymer flocculant used and the specific system design.
• Ensure the system discharges to a well stabilized area, with flow dispersion and interruption devices
placed as needed. Consider the entire flow path to the receiver and apply stabilization measures
along the path as needed.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-42
Erosion and Sediment Control Guide for Urban Construction
• Consider air and water temperatures experienced during active use of the system and confirm that the
product will be effective at the planned dose temperatures. Some polymer flocculants become less
effective at colder temperatures. As a result the dosing rate may need to be increased or an alternative
flocculant or treatment method may be required.
• Ensure pumping rates do not shift substantially from the rates estimated during flocculant and system
selection and sizing, as the flocculant and filters may be less effective at different flow rates.
• For a multi -barrier approach, always incorporate final filtration for discharge and apply stabilization and
energy dissipation in the downstream flow path.
• Keep a spill response kit near the polymer flocculant water clarification system and ensure staff are
aware of spills response and reporting protocols.
System siting
Flocculant based clarification systems should never be sited in natural areas, terrestrial or aquatic
features. Where effluent from the system will be discharged to a natural water feature, the distance
between the system outlet and the water feature should be at least 30 metres.
• Where siting 30 m away is not possible, consult with the local CA for guidance on siting and monitoring
efforts that can be applied to mitigate risk.
• For large installations, like active treatment systems with weir tanks, ensure placement on a stabilized
ground surface and consider accessibility by vehicles transporting system components.
Inspection and maintenance
• For systems where water is being pumped, such as in active
treatment, inspect daily during active use and keep a record of the
inspection. Guidance on active treatment systems is provided in
the following section.
• Where flocculants are used in a passive way (e.g. in an
interceptor swale), inspections should be carried out on a weekly
basis as well as before and after significant rainfall or snowmelt
events.
Carry out routine effluent monitoring to verify performance and Figure B2-25: Polymer flocculant
ensure that effluent quality meets any applicable standards. If in gel -block form
contaminant removal performance declines, investigate each
system component — dosing, mixing, settling, filtration — to identify the potential source of the problem
If the system is treated pumped water that is being discharged to a natural water feature, cease
pumping until performance issues can be resolved.
The following components should be inspected, if applicable:
Dosing area. Ensure dosing is occurring as intended. Where solid block forms are used, ensure
they are not being coated with sediment, as this can compromise their capacity to dissolve into the
water. Also consider block positioning to ensure good contact so that water isn't short circuiting the
dosing area.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-43
Erosion and Sediment Control Guide for Urban Construction
o Filters. Regular inspection is required to ensure filters remain effective. Where geotextile bags are
used for final filtration, close monitoring is required to ensure that bags are replaced as needed.
Because they can fill up quickly when used as part of a polymer system, caution should be
exercised to prevent rupture.
o Sediment settling area(s). Sediment accumulation should be removed at the appropriate trigger
(e.g. 30% height of a sediment retention barrier).
• For ditch / swale systems, inspect for evidence of excessive sediment accumulation and / or erosion,
and clean out or re -stabilize as needed.
• Ensure the flocculants are being stored and maintained as specified in guidance from the supplier /
manufacturer to ensure ongoing efficacy.
• Ensure staff overseeing the use of the system have a thorough knowledge of proper maintenance.
• Where there is evidence of erosion at the discharge point or along the flow path downstream of the
discharge locations, re -consider whether stabilization is adequate to protect against erosion based on
the flows.
• Keep MSDS sheets and toxicity reports related to the flocculant used in an easily accessible location
on the site.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Ensure flocculant -treated sediment and any leftover flocculant are properly disposed of.
• Where polymer flocculants left over are suitable for reuse elsewhere, ensure proper handling
and storage in accordance with supplier / manufacturer guidance.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-44
Erosion and Sediment Control Guide for Urban Construction
ACTIVE TREATMENT SYSTEMS
Active treatment systems incorporate weir tanks,
flocculants and filters in order to achieve a high
contaminant removal rate while occupying a
relatively small footprint (Figure 132-26).
They differ from a passive flocculant -based
treatment train in that they are more sophisticated,
offering more precise control of the treatment
processes, such as flocculant dose metering and
filter backwashing capabilities. They may also
incorporate hydrodynamic processes for physical
separation of floatables and suspended particles
from the water. Flocculants are often incorporated
in the treatment process to promote sediment
particle binding and settling, and filters (e.g. sand)
are included as a final 'polishing' step before
water leaves the system.
Figure 132-26: Active water treatment system for
construction site runoff
Active treatment systems are highly customizable and can range from simple to complex, depending on
the components included, the types of contaminants being removed and the removal rate required.
Product suppliers typically rent out the system components for the desired duration and often provide
installation and other operations support to ensure the system performs effectively.
Application
Active treatment systems should be considered for removing contaminants during pumping of
construction site stormwater when:
• Treatment is required for short-term pumping activities, such that taking the time to construct a BMP
with similar sediment removal capacity (e.g. sediment control pond) would be impractical;
• A high sediment removal rate is required but the area available for treatment is too small to
accommodate a sediment control pond;
• Water being treated contains certain contaminants of concern that require removal through specific
chemical and/or physical processes;
• Site specific policy requirements define more stringent effluent water quality standards than are typical
and/or achievable when applying other conventional BMPs; or
• Other conventional sediment control measures have failed to achieve the necessary removal rates.
Design and installation
Selection of system and sizing should be done in consultation with the system supplier. Consider what
treatment level is needed and what contaminants should be removed in order to find the right system
to achieve those goals.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-45
Erosion and Sediment Control Guide for Urban Construction
Typical system components may include:
Flocculant and associated dosing system (e.g. injection into water stream, passive dosing by
allowing water to flow over and around water soluble flocculant blocks);
o Detention tank with weirs or baffles to allow mixing and sediment settling; and
o Filters with or without backwashing capability.
• Determine the location where the system will be placed based on consideration of the following:
o Placement at least 30 m from any natural water feature in order to minimize risk of a spill into the
feature. Where siting 30 m away is not possible, consult with the local CA for guidance on siting
and monitoring efforts that can be applied to mitigate risk.
o Placement on a stabilized ground surface.
o The location must be accessible to the vehicles transporting the system components. Consider
whether the largest component that will be brought on site can be transported and placed in the
intended area.
• Where flocculants are used, refer to flocculant guidance. The proposed use of any cationic flocculant
is subject to approval by the local municipality and CA, as well as any other agencies involved in
regulating discharges for the site.
• Selection of a flocculant should be based on demonstrated sediment settling performance during
bench scale testing using soil and water samples from the site.
• For any flocculants to be used, toxicity data must be available to demonstrate that the product is non-
toxic to aquatic organisms at the intended dosing/application rate.
• Ensure pumping rates do not shift substantially from the rates estimated during flocculant and system
selection and sizing, as the flocculant and filters may be less effective at different flow rates.
• Ensure the system discharges to a well stabilized area, with flow dispersion and interruption devices
placed as needed. Consider the entire flow path to the receiver and apply stabilization measures
along the path as needed.
• For a multi -barrier approach, add a sediment control barrier around the area where the active
treatment system is placed. This will provide added protection in the event of any pipe leaks.
• Keep a spill response kit near the active treatment system and ensure staff are aware of spills
response and reporting protocols.
Inspections and monitoring
Inspect daily during active use of the system and keep
a record of the inspection. Inspection of specific
system components may be the responsibility of the
supplier, depending on the terms of the contract. As a
minimum the onsite inspector should look monitor
sediment accumulation in the tank and effluent quality.
• Carry out routine effluent monitoring to verify
performance and ensure that effluent quality meets
any applicable standards.
Figure B2-27: Treated water from an active
treatment system
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-46
Erosion and Sediment Control Guide for Urban Construction
• Ensure system is monitored daily during active pumping and that staff overseeing the use of the
system have a thorough knowledge of proper operation.
• Where there is evidence of erosion at the discharge point or along the flow path downstream of the
discharge locations, re -consider whether stabilization is adequate to protect against erosion based on
the flows.
• Keep MSDS sheets and toxicity reports related to the flocculant used in an easily accessible location
on the site.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-47
Erosion and Sediment Control Guide for Urban Construction
VEHICLE TRACKING CONTROL
(a.k.a. track out control, mud tracking control)
Vehicle tracking control is an umbrella term for a variety of practices that are applied at construction
site entrances to control vehicles tracking mud offsite. Tracking controls can also be applied within
a site where there is a need to minimize sediment transport from active construction areas to other
areas that area being protected (e.g. LID features, developed areas of the site). For example,
during building construction, tracking controls can be applied at the lot exit so that vehicles don't
track mud onto the roads and ultimately into storm drains.
Preventing vehicle mud tracking helps to keep sediment
out of storm drains, end -of -pipe controls and natural
features, and reduces the risk of dust pollution. Vehicle
tracking controls generally fall into the following
categories:
• Mud mats I Mud mats include rock/stone pads
underlain with geotextile fabric or pre -fabricated
products in various designs. They are used primarily
for stabilizing site entrances, but some pre -fabricated
mud mat products may also encourage some mud
removal by providing an uneven or bumpy surface that
digs into the mud caked onto the tires.
Shaker racks / grates / ridges I These racks or
grates are pre -fabricated products that are designed to
(i) provide a stable entrance and (ii) dislodge mud from
tires as vehicles bounce slightly while driving over the
uneven surface. As their ability to remove mud relies
on the bouncing/shaking action, they need to be long
enough — at least one full tire rotation — to provide
opportunity for dislodgment.
• Wheel washers I A well installed vehicle wheel
washing system can provide the highest level of
protection from offsite mud tracking. These types of
devices are designed to spray water onto tires as the
vehicle drives through them, essentially pressure
washing mud from the tires. They typically include or
are installed with a rack through which water drains
and an area for capturing of dirty wash water, which is
directed towards a sediment control measure. Wheel
washers come is a wide variety of designs and
configuration. Wheel washing can also be less
sophisticated, such as passive washing — where the
vehicle is simply driven through a pool of wash water
in a contained area — and manual washing carried out
with a hose by on site staff.
Figure B2-28: Vehicle tracking
controls. From top to bottom: mud mat,
shaker rack, vehicle wheel washer.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-48
Erosion and Sediment Control Guide for Urban Construction
Application
Vehicle tracking controls should be applied when:
• The site is greater than one hectare in size;
• There will be grading and filling operations in close proximity to construction site entrances; or
• Weather and site conditions will result in saturated, muddy soils;
Wheel washing should be used as the vehicle tracking control if:
• Mud tracking is an ongoing issue and simpler vehicle tracking controls are not providing
effective mitigation;
• Other tracking controls cannot be constructed due to site constraints
• The site contains contaminated soils; or
• The local municipality makes it a requirement.
Design and installation
Mud mats
The following are recommended design specifications for mud mats constructed with rock pads:
FDesign attribute Specifications
Length >_ 20 m
Width Full width of the entrance
Rock/stone layer thickness 450 mm
Rock /stone details For the first 10 m in from the road: 50 mm diameter clear stone
Remaining length: 150 mm diameter clear stone
Bottom layer type Non -woven geotextile fabric or graded aggregate filter
• See mud mat design detail in Figure B2-29.
• For pre -fabricated mud mat products, adhere to manufacturer specifications for design and
installation.
• Where constructed over top of a culvert or ditch, a sediment control barrier (e.g. sediment fence,
filter sock) should be installed along the edges of the pad to prevent sediment from being
washed into the area below.
• Ensure that drainage from the mud mat is conveyed to a sediment control measure for removal
of suspended sediment.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-49
Erosion and Sediment Control Guide for Urban Construction
Shaker racks / grates / ridges
• For pre -fabricated products, adhere to manufacturer specifications for design and installation.
• Ensure that the device installed is long enough to allow for at least one full tire rotation so that
the vehicle will bounce enough to dislodge mud.
• Ensure device installed is wide enough to accommodate the passage of any construction
vehicle on site.
• The rack should be installed with space below to allow for sediment deposition.
• Install rock pads on either side of the shaker rack.
• Convey drainage from the shaker rack to a sediment control measure.
• Where constructed over top of a culvert or ditch, a sediment control barrier (e.g. sediment fence,
filter sock) should be installed along the edges of the installation to prevent sediment from being
washed into the area below.
Wheel washing
• Where a full proprietary system is used, ensure that product selection, placement and
installation is consistent with guidance provided by the manufacturer / supplier of the product.
• The particular model of wheel washing system needed should be determined based on the
number of vehicles cleaned daily and the amount of mud that needs to be removed from each
vehicle
• Ensure all dirty wash water will be drained into a containment area below and then conveyed to
a sediment control measure for removal of suspended sediment.
Inspection and maintenance
• Inspect vehicle tracking controls weekly, and before and after significant rainfall (see definition in
Section 10.1.2) or snowmelt events, and keep a record of the inspection.
• Inspect mud mats for excessive sediment accumulation. For rock pads look for signs that the voids
have been filled with sediment and replace granular material as needed.
• Clean up any sediment tracked onto public roads at the end of each day.
• Ensure the installation of storm drain inlet protection for inlets in roads that will be subject to street
sweeping, since this can sometimes cause additional sediment to be swept into storm drain inlets.
• Any repair or maintenance needs identified should be repaired within 48 hours or sooner if natural
receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Ensure all components are removed with minimal disturbance, and that waste materials are
properly disposed of.
• Grade and restore the area as per the final stabilization plans.
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-50
Erosion and Sediment Control Guide for Urban Construction
MUD MAT DETAIL NOTES
1. MUDNIATTOBEUNDERLAIN WITH AOEOTEXTILE CLOTH
2. SEDIMENT WILL BE CLEANED FROM PUBLIC RIGHT OF WAYS AS REQUIRED
3, STCRM INLETS INCLOSE VICINITY TO MUD MATTO BE PROTECTED WITH INLET
CONT RCL MEASURES
EXISTING
CULVERT UNDERNEATH
MUD MAT
INSTALL FILTER SOCKS ALONG
THE CREST OF DITCH AND
ALONG THE EDGE OF MUD MAT
MIN, 300 mm THICK UNDERLAIN WITH GEOTExTILE
DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL
SHOULD BE TAILORED FOR EACH SITE AND PROJECT
SCALE REV DATE
TRCA ESC DESIGN DETAIL I „_
iwomamd Regan pRAWINGTITLE DWG NG
Canservallon MUD MAT 05
A�Inanr
LGCLAIMERTORONTO AND REGION CONSERVATIDN AIFFLIMITY( ORCAI IS NOT LIABLE FOR INF RNATION SHOWN ON THIS DRAWING _PLEASE
JSE R FOR REFERENCE ONLY
Figure 132-29: Design detail for mud mat for construction site vehicle access
Appendix B: Erosion and Sediment Control Best Management Practices Page B2-51
APPENDIX C:
BEST MANAGEMENT PRACTICES FOR
IN AND NEAR WATER WORKS
Erosion and Sediment Control Guide for Urban Construction
BMPs for in and near water works
In -water works should be avoided if possible, and may be viewed as a last resort. The rationale behind
this is to minimize potential ecological impacts, as in -water works are intrusive to aquatic habitats and
considered high risk. Where possible, selecting construction methods that avoid disturbance of water
features, such as trenchless crossing methods for installing pipes, cables and other underground
services, should be employed.
When it is necessary to carry out works in or adjacent to water features, preventing the release of
sediment into the waterbody requires careful design and effective implementation of measures that
isolate the work area from the rest of the feature. One of the best approaches to reduce the risk of
sediment release into the waterbody is to phase the work such that the area of work is isolated to small
sections that can be stabilized at the end of each work day. Planning of in water construction activities
should always consider methods that minimize the construction footprint and duration of work, and are
scheduled to ensure completion outside of spawning times in order to mitigate long-term negative impacts
to the feature and aquatic ecosystem.
Construction timing
All in water and near water works
should be scheduled such that works
are completed outside of the
restricted activity timing windows
listed in Table Ci. The regions
defined in Table C1 are delineated in
the map shown in Figure C1. These
timing windows ensure pollution is
minimized and aquatic habitats are
protected during critical life stages,
such as spawning, juvenile stages
and migration. If the proposed works
cannot be completed outside of the
indicated spawning times, the work
may need to be phased in over more
than one year, or approval to work
during the restricted activity timing
window is required. In Ontario, MNRF
and DFO should be consulted for
permission to carry out any in or near
water works during the restricted
activity timing windows.
If species listed under the
Endangered Species Act (S.O. 2007)
or Species at Risk Act (S.C. 2002)
could be impacted by the construction
activities, additional approvals may be
f
4 4 Nalhwew Regiun
0 Ncarlhcasl Reow
Thu,, Mi} r Tknn fts VI Swtham Repw
r
..re,m sumboZ
r
`e —
nmfo--
leW a
uh�
o as m
A }
Figure C1: Ontario's Northwest, Northeast and Southern Region
boundaries for determining application of restricted activity timing
windows. Source: Fisheries and Oceans Canada, 2013
Appendix C: Best management practices for in and near water works Page C-1
Erosion and Sediment Control Guide for Urban Construction
required prior to initiating any in or near water works. The local conservation authority, MECP or DFO and
their respective websites should be consulted to determine site specific requirements.
Table C1: Ontario restricted activity timing windows for protection of fish and fish habitat during in water
and near water works (source: Fisheries and Oceans Canada, 2013)
Walleye April 1 to June 20
Northern Pike April 1 to June 15
N
d
Lake Sturgeon May 1 to June 30
CL
N
rn Muskellunge May 1 to July 15
c
c
aLarge/ May 15 to July 15
to Smallmouth Bass
m
c
a Rainbow Trout April 1 to June 15
Other/Unknown April 1 to June 15
Spring Spawning Species
Lake Trout
CM Brook Trout
a
a
N Pacific Salmon
rn
c
c
3 Lake Whitefish
M
CL
N
A Lake Herring
LL
Other/Unknown Fall
Spawning Species
April 1 to June 20
April 1 to June 15
May 1 to July 15
May 15 to July 15
March 15 to May 31
March 15 to May 31
May 1 to June 30
March 15 to May 31
May 15 to July 15 May 1 to July 15
April 1 to June 15 March 15 to June 15
April 1 to June 15 March 15 to July 15
Sept. 1 to May 31 Sept. 1 to May 31 Oct. 1 to May 31
Sept.
1 to June 15
Sept.
1 to June 15
Oct.
1 to May 31
Sept.
1 to June 15
Sept.
1 to June 15
Sept.
15 to May 31
Sept. 15 to May 31 Sept. 15 to May 15 Oct. 15 to May 31
Oct. 1 to May 31 Oct. 1 to May 31 Oct. 15 to May 31
Sept. 1 to June 15 Sept. 1 to June 15
Oct. 1 to May 31
Appendix C: Best management practices for in and near water works Page C-2
Erosion and Sediment Control Guide for Urban Construction
Table C2: Common best practices for protecting natural water features during in -water construction
Description
Geotextile material vertically suspended in water to enclose an in -water work area and contain sediment transport to a limited area within
Sediment / the disturbed water body. Implemented around construction activities occurring "in the wet", meaning the area where construction is C-4
turbidity curtains occurring is not being dewatered. The sediment curtains act as a filter baffle and isolate/protect an important or sensitive in -water feature.
Sediment curtains are also applied to enhance sediment settling in temporary or permanent detention ponds.
Temporary stream
Steel plate or other timber crossing placed above top of bank and anchored, or a raised stone embankment constructed across a
crossings via
watercourse to allow passage of construction vehicles. Water conveyance through the embankment is provided via culvert(s) incorporated
temporary bridge
within the stone. Temporary crossings are intended to allow access to both sides of a watercourse at a stable concentrated point thereby
or culvert(s)
limiting disruption and erosion impacts to a smaller area.
Waterproof
A sealed structural barrier applied to block the passage of water into and out of an in water construction area.
Isolation
The WIB, also known as a cofferdam, can be applied in any natural water feature to maintain a waterproof separation that prevents
C-10
Barrier
sediment from the work area from being transported into the larger water feature. WIBs that are designed to extend across the length of the
(WIB)
watercourse to block all flows must be applied with one of the watercourse diversion or bypass methods described in this Appendix.
Diversion /
A secondary channel alongside the work area to passively divert flows around it and allow for work within the existing channel to
bypass
YP
proceed in dry conditions. Typically applied with temporary waterproof barriers / dams to keep flows out of the existing channel and
C-15
channel
route them into the bypass. All methods of temporary diversion help maintain water quality by containing sediment in the dry,
isolated work area.
m
A passive watercourse diversion that concentrates flows to a pipe or chute where gravity then conveys them, unimpeded, around or through
the work area. All methods of temporary diversion help maintain water quality by containing sediment in the isolated, dry work area.
Flume
Isolation of work area is typically achieved by blockage of flow upstream and downstream with WIBs or other waterproof barriers / dams.
C-17
o bypass
Where dewatering of the work area is necessary, appropriate discharge treatment is required to remove suspended sediment prior to
3
discharge. Flumes may not be suitable for sensitive streams.
N
o
An active watercourse diversion method in which an electrical or fuel -powered generator is used to pump flows around the work area
in order to create dry work area. All methods of temporary diversion help maintain water quality by containing sediment in the dry,
Bypass
isolated work area. Pump intakes are fitted with fish screens to prevent fish entry, and fish collection and relocation (with the
C-20
pumping
appropriatepermits) is often necessary as this method does not allow for fish passage. Bypass pumping may not be suitable for
sensitive streams and is only appropriate for short duration projects.
The removal of water within the immediate construction area to facilitate working in the dry. Dewatering effluent should be treated and
Dewatering released a minimum of 30 metres from any surface water feature, where possible. The discharge location and flow path should be well C-9
vegetated or otherwise stabilized so that erosion of soil does not occur at the discharge point, and treated water does not pick up any
additional sediment along the flow path back to the receiver.
Appendix C: Best management practices for in and near water works Page C-3
Erosion and Sediment Control Guide for Urban Construction
SEDIMENT CURTAIN
(a.k.a. turbidity curtain)
Sediment (or turbidity) curtains consist of a weighted, permeable or impermeable material that is secured
and vertically suspended in water using a floatation device. While work is being conducted in the wet, the
curtain keeps sediment contained to the area between the curtain and the bank and also slows the
movement of water in the isolated area. Over the duration of the work, sediment settles out of suspension
to the bottom of the water body.
Potential permitting requirements
• As work will be conducted in the wet, there is the possibility that
work will negatively impact aquatic life present within the contained
area of the curtain. Prior to construction, the proposed in -water
works should be reviewed with the local CA, Fisheries and Oceans
Canada and applicable provincial ministries.
• If necessary, obtain permits / authorizations to collect and relocate fish
and other wildlife from the isolated work area.
Planning
• Plan works to occur outside of the restricted activity timing windows (spawning times) in Table C1.
• Consult the manufacturer of the sediment/turbidity curtain to determine the appropriate dimensions,
curtain type, anchoring materials and buoyancy requirements for each application.
• Be aware that dynamic watercourses (like urban rivers) have the higher potential for changes in water
velocities and levels which can displace the curtain.
• Avoid the times of year when there's a higher potential for debris, like ice, in the watercourse.
• Remember that periods of fluctuating water levels and seasonal changes will make installation difficult
and can result in failure of the curtain.
• Consult with aquatic biologist or equivalent expert if fish rescue / relocation activities are necessary to
carry out the work.
• Keep spill kit and spill response plan on-site in the event deleterious substances enter the water body.
Design
• Suspend geotextile curtains in the water with floatation devices/buoys and affix the base of the
water body with an anchoring system (chains, concrete blocks, anchor, etc.).
• Ensure a freeboard of more than 50 mm above the floatation device.
• Customize the length of the sediment curtains for the job.
• Vary the anchors that weigh the curtain down to facilitate its contact with the water bottom for
different bed materials (ex. muddy, sandy, rocky, uneven, etc.)
• Refer to Figures C3 and C4 — Ontario Provincial Standard Drawings for Turbidity Curtains (Nov.
2015) for design details.
Appendix C: Best management practices for in and near water works Page C-4
Erosion and Sediment Control Guide for Urban Construction
J0 ,
c �
-
- g
� o.•/ civ a.- a -< y
Figure C2: Sediment curtain installed in a lake
Installation
w
• Refer to the manufacturer's installation instructions.
• It may be helpful to roll out the length of curtain on land before guiding into the water.
• When guiding the curtain into the water, ensure it does not become twisted and avoid sharp
objects.
• Position the curtain at least 5 m outside of the perimeter of the work area.
• Hold the curtain parallel to the bank using cable or rope moorings affixed to the shore, typically
at the upstream and downstream ends.
• Overlap curtains to form a continuous barrier.
• Attach t -bars to curtains and embed into the water bottom (if possible) to provide structure.
Appendix C: Best management practices for in and near water works Page C-5
Erosion and Sediment Control Guide for Urban Construction
Inspection and maintenance
• Conduct daily inspections prior to starting work to ensure that the sediment curtain is functioning
as intended and that it is not damaged.
• Look for turbid water outside of the area enclosed by the curtain, especially at the upstream or
downstream limits where the curtain may not be properly secured to the native bank.
• Ensure that the floatation boom is visible and there's no evidence of overtopping.
• Remove any debris (logs, branches, garbage, etc.) that may be caught in or on the curtain.
• Malfunctioning components and damages should be repaired within 48 hours or sooner if
environmental receptors are at imminent and foreseeable risk of adverse impact.
• Physical disruption of the curtain may result in the re -suspension of sediment in the water
column and care should be taken to avoid hitting the curtain.
Decommissioning
• Proper and careful removal of the curtain and its components following the completion of
construction activities is very important in order to prevent the re -suspension of sediment. Refer
to manufacturer's instructions for proper removal procedures.
• Consult with regulatory agencies permitting the works to consider solutions to address
accumulated settled sediment.
• Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-6
A
r Water 1 Mooring buoy
line
Mooring line
Bottom of
waterbody
WATERBODY
I—
A Floatation WORK AREA
Change in direction
—Mooring buoy
Typ
Anchor sufficient to provide
positive positioning of
turbidity curtain
WATERBODY
NON WORK AREA
PLAN
Load line
Erosion and Sediment Control Guide for Urban Construction
Load line
Formed and heat
sealed or sewn seam
OPSD 219.261
Formed and heat
i sealed or sewn seam
' OPSD 219.261
10m maxi
Turbidity Curtain
geosynthetic
Adjustment lines —r SECTION A—A
Typ
NOTES:
A All dimensions are in millimeters unless otherwise shown.
TURBIDITY CURTAIN
Figure C3: Ontario Provincial Standard Drawing for turbidity curtain in a water body
Appendix C: Best management practices for in and near water works
AI
Tie down
Ballast —
Water Existing
line ground
surface
Nov 2015 1 Rev 2LoXia
OPSD 219.260
Page C-7
Load line
Upper sleeve �
Formed and heat
sealed or sewn seam
Turbidity curtain
geosynthetic
Formed and heat
t
sealed or sewn seam -
Lower Sleeve
Ballast
NOTES:
A All dimensions are in millimeters.
Erosion and Sediment Control Guide for Urban Construction
/Adjustment lines
/ ✓ 11 �
OBLIQUE VIEW
TURBIDITY CURTAIN
SEAM DETAIL
Water level
Bottom of waterbody
Nov 2015
t
OPSD 219.261
Figure C4: Ontario Provincial Standard Drawing for turbidity curtain in a water body - seam detail
Appendix C: Best management practices for in and near water works Page C-8
Erosion and Sediment Control Guide for Urban Construction
DEWATERING AN ISOLATED WORK AREA
The removal and discharge of water from a work area to create dry working conditions is a necessity on
many construction sites within waterbodies or where the water table is high and groundwater is
anticipated. When sediment -laden water is being removed from the work area, the water must be treated
using appropriate sediment control measures before it can be released into the environment (outside the
work area). As the treated water is released, erosion mitigation measures must be in place to ensure the
flows do not erode the discharge area or the flow path to the ultimate receiving water feature. Refer to
Section 6.4 and Appendix B2 for additional guidance on dewatering best practices.
Please consider the following in conjunction with the in -water
isolation measures described in this Appendix.
• If necessary, obtain permits / authorizations to collect and relocate
fish and other wildlife from the isolated work area (e.g. License to
Collect Fish for Scientific Purposes, Wildlife Scientific Collector's
Authorization). For species at risk sites, additional permits or
authorizations may also be required through the MECP.
• Install, operate and maintain a pump intake with a fish screen in
advance of the initial drawdown and in accordance with the
requirements from pertinent governing agencies.
• Treat pumped water if required using a BMP described in Section 6.4 of the Guide or Appendix
B2 (e.g. sediment bag). Refer to ESC Design Detail drawings #1 and 2 (Figures 132-16 and 132-
17) for depictions of a dewatering treatment train system incorporating a sediment bag.
• Ensure the water is ultimately discharged to a well -vegetated located at least 30 m, if possible,
from any waterbody, and that the flow path is stabilized. See Figure C7 (ESC Design Detail #9)
for site isolation schematic, including dewatering details.
• Once initial drawdown is complete, create a filtered sump in the work area by digging a small pit
below design elevations where water can collect and the pump intake can be situated.
Appendix C: Best management practices for in and near water works Page C-9
Erosion and Sediment Control Guide for Urban Construction
WATERPROOF ISOLATION BARRIERS (WIB)
(a.k.a cofferdams)
Waterproof isolation barriers (WIB) are constructed structures applied on a temporary basis to block the
passage of water into and out of an in water construction area. They can be applied in any natural water
feature to maintain a waterproof separation that prevents sediment from the work area from being
transported into the larger water feature. These barriers can be composed of a variety of materials but are
often constructed with pea gravel filled bags and a waterproof sheet membrane.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife stranded in
the isolated area to the waterbody prior to dewatering, every time the isolation barrier is breached
and/or when aquatic species are visible.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger permit to take water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Phase works to ensure that disturbed areas can be stabilized at end of day.
• Stabilize or cover disturbed areas if left exposed and inactive longer than 3 days, and in anticipation of
precipitation or snow melt events.
• Use hydraulic modeling to determine the height at which the WIB should be constructed. Refer to
Appendix A for the specified flood risk calculation, which can be used to determine the design storm
for sizing of WIBs, based on consideration of service life (i.e. how long the WIB will be in place) and
the acceptable level of risk, which should be no greater than 5%. As a minimum, WIBs should be
sized to hold back flows from the 2 year event with some freeboard, unless otherwise approved
by the relevant regulatory agency.
• Have the impact to the local channel section assessed by a qualified person if more than one third of a
watercourse is to be isolated during the planned work.
• Include a contingency or emergency response plan documenting which flows will overtop the WIB and
outline the steps to take in the event that high flows breach the barrier.
• Keep spill kits and a spill response plan on-site in the event deleterious substances enter the water
body.
Design
• Refer to ESC design detail for "Meter bag waterproof isolation barrier" in Figure C6 and "Site isolation
layout' in Figure C7, which shows the set up for use of a WIB for partial stream isolation to facilitate
work in the dry.
Use meter bags made of durable material and capable of being moved at least twice for the installation
and removal.
Appendix C: Best management practices for in and near water works Page C-10
Erosion and Sediment Control Guide for Urban Construction
• Using sand to fill bags that are part of a WIB should be avoided, as sand, if released, will fill small
voids in the substrate of the water feature and thereby compromise invertebrate habitat. Pea -gravel fill
is recommended.
• Key in a waterproof membrane that overtops the isolation barrier to minimize leaks where a water -tight
seal is difficult to achieve.
• Design the barrier using a double lined wall with a layer of impermeable liner secured in-between
(refer to Figure C6).
• For construction during winter, consider substituting plastic bags for a more durable material, as the
plastic is more likely to tear when frozen.
Figure C5: Waterproof isolation barrier (cofferdam)
Installation
• Use the dewatering techniques as described in Section 6.4 and Appendix 132 (see Figures 132-16 and
132-17 for dewatering treatment train) when pumping water out to establish and maintain a dry work
area.
• Fill bags to varying capacities depending on site conditions and where they will be placed.
Appendix C: Best management practices for in and near water works Page C-11
Erosion and Sediment Control Guide for Urban Construction
• Ensure that bags are not overfilled to allow for some malleability during barrier construction, and also
to prevent the fill from falling out of the bag into the feature.
• Avoid excessive amounts of relocation as it increases the risk of the bag tearing.
• Ensure that the bottom of the barrier is in complete and continuous contact with the bed of the water
feature.
• Use different sizes of bags in areas where there are irregularities in the water bottom, where the
barrier needs to tie into native bank, and where voids within the barrier need to be filled. For example,
gaps between meter bags may need to be filled with smaller pea gravel bags.
• Construct the WIB from the top of bank, where possible, and in sequence from upstream to
downstream.
Inspection and maintenance
• Conduct an inspection of the WIB at the start of each day and document the findings.
• Repair leaks, holes, torn areas, etc. within 48 hours or sooner if environmental receptors are at
imminent and foreseeable risk of adverse impact.
• Monitor the forecast as storm events, floating debris, ice, etc. can displace the isolation barrier or parts
thereof.
• When possible, keep a surplus of materials (meter bags, pea gravel, etc.) on-site so that repairs and
maintenance can be performed quickly.
• Dewater the site when barrier is breached and ensure the dewatering system is inspected and
maintained in good working condition regularly.
• Avoid placing / storing fuel or other potential aquatic contaminants in the floodplain.
Decommissioning
• Remove all excess material, accumulated sediment and debris
from the dry, isolated work area before removing the isolation
barrier.
• Follow sequencing shown on the construction drawings for the
decommissioning of the isolation barrier and in an upstream to
downstream direction.
• Remove the isolation barrier carefully to minimize disturbance to
the channel.
• Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-12
HEIGHT DETERMINED BY
SPECIFIED FLOOD RISK
CALCULATION DESCRIBED IN
APPENDIX OF ESC GUIDE FOR
URBAN CONSTRUCTION
LOWER WATER LEVEL
Erosion and Sediment Control Guide for Urban Construction
IMPERMEABLE LINER
METRE BAG FILLED WITH PEA GRAVEL. NUMBER
OF BAGS AS PER SITE CONDITIONS. PEA GRAVEL
BAGS MAY BE REQUIRED TO FILL VOIDS
ISOLATED
AREA
REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
SCALE REV DATE
TRCA ESC DESIGN DETAIL „_� e
T=naxgon DRAWINGTITLE
ConvmMETRE BAG WATERPROOF ISOLATION BARRIER
DISCLAIMER. TORONTO AND REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE USE IT FOR REFERENCE ONLY
Figure C6: Design detail for waterproof isolation barrier constructed using metre bags
a
Appendix C: Best management practices for in and near water works Page C-13
Erosion and Sediment Control Guide for Urban Construction
ENSURE THE ENDS OF THE
DIRECTION
ISOLATION MEASURES TIES
OF FLOW
INTO THE BANK
4
CHANNELBANK
CREATE A FILTERED SUMP BY EXCAVATING ISOLATED
(TYPICALLY 0,30 m) AND BY PLACING CLEAR -WORK AREA 2/3 CHANNEL WIDTH
STONE/FILTER FABRIC AROUND PUMP INLET
(IF FEASIBLE, ENSURE THAT i OF THE CHANNEL
CAPACITY REMAINS. CONSULT THE LOCAL
/ CONSERVATION AUTHORITY AS REQUIRED)
TREATMENT OF SUMP DISCHARGE:
FILTER BAG OR TREATMENT TRAIN
APPROACH SHOULD BE LOCATED IN A
WELL -VEGETATED AREA AWAY FROM
WATER BODY, 30 m PREFERRED
NOTES:
1. DETAILS FOR WATERPROOF ISOLATION BARRIER (WIB) SHOULD BE PROVIDED SEPARATELY
2. THE WIB SHOULD BE SIZED USING THE FLOOD RISK CALCULATION
3. EXCAVATION SHOULD NOT BE REQUIRED FOR THE INSTALLATION OF THE WIB
4. ENSURE THAT THE DOWNSTREAM AND UPSTREAM ENDS OF THE WIB CREATE A CONTINUOUS BARRIER WITH THE EROSION AND SEDIMENT CONTROL
MEASURES ON THE TABLELAND
S. WIB SHOULD ONLY BE REMOVED ONCE THE ISOLATED AREA HAS STABILIZED
6. ALL PUMP INTAKES SHOULD BE FITTED WITH A FISH SCREEN IF THERE IS THE POTENTIAL FOR FISH OR OTHER AQUATIC WILDLIFE ENTRAPMENT
THIS DETAIL REPRESENTS AN IDEAL SCENARIO. SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
TRCA ESC DESIGN DETAIL SLUE REv DATE
�� N.T.S. 1 MARCH 2019
Tael.e+�a lon DRAWINGTITLE DWG NO
� COMBrVBtlOf1
"W`"" SITE ISOLATION LAYOUT 09
DISCLAIMER: TORONTO AND REGION CUNSERVA i i HCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE USE IT FOR REFERENCE ONLY
Figure C7: Design detail for partial watercourse isolation using a waterproof isolation barrier (coffer dam)
Appendix C: Best management practices for in and near water works Page C-14
Erosion and Sediment Control Guide for Urban Construction
TEMPORARY WATERCOURSE DIVERSION - BYPASS CHANNEL
A bypass channel is a secondary channel alongside the work area to passively divert flows around
it and allow for work within the existing channel to proceed in dry conditions. All methods of
temporary diversion help maintain water quality by containing released sediment to the dry, isolated
work area.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Chose the temporary watercourse diversion that will have the least amount of disturbance to the
waterbody and the surrounding area.
• Sequence the work to minimize the length of channel that will be bypassed.
• Use hydraulic modeling to determine the size and shape of the bypass channel. Refer to Appendix A
for the specified flood risk calculation, which can be used to determine the design storm for sizing of
WIBs and bypass channels, based on consideration of service life and the acceptable level of risk,
which should be no greater than 5%. A temporary bypass channel should, as a minimum, be
sized to convey the 2 year event, unless otherwise approved by the relevant regulatory agency.
• Include a contingency plan on the drawings documenting which flows will overtop the system, the
steps to take in the event of a breach and a plan to remove the equipment and other material from the
floodplain.
• Keep spill kits and a spill response plan on-site in the event deleterious substances enter the water
body.
Design
• Ensure watercourse diversion allows for fish passage.
• Store the material removed for the construction of the bypass channel 30 metres away from the
water body where possible and contain the stockpile with sediment control measures.
• Tie the downstream end of the bypass channel into the existing channel beyond the work area.
• Protect the bypass channel from erosion prior to receiving flows using erosion
netting/blankets/matting/geotextile fabric with an anchoring system, suitably sized riprap, or
established vegetation.
• Ensure that there is no increase in the velocity of the flows in the bypass channel.
Appendix C: Best management practices for in and near water works Page C-15
Erosion and Sediment Control Guide for Urban Construction
Installation
• Install the temporary bypass channel before starting other construction work.
• Sequence the construction of the bypass channel in a downstream to upstream manner while
maintaining berms at both ends until ready to receive diverted flows.
• Install waterproof isolation barriers, if required, at the upstream and downstream ends of the work area
to prevent water from entering the work area.
Inspection and maintenance
• Inspect the bypass channel weekly, after every rainfall and significant snowmelt event and keep
a record of the inspection.
• Repair localized slope failures and erosion concerns within 48 hours of being identified or
sooner if environmental receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
• Stabilize the new channel prior to the return of flows so as to minimize sediment released.
• Ensure any stranded fish or wildlife are collected and relocated in accordance with licenses / permits.
• Follow sequencing shown on the construction drawings.
• Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-16
Erosion and Sediment Control Guide for Urban Construction
TEMPORARY WATERCOURSE DIVERSION - FLUME BYPASS
A flume bypass is a passive type of watercourse diversion that concentrates watercourse flows to a
point where they enter a pipe or chute for conveyance, by gravity, around or through the work area.
All methods of temporary diversion help maintain water quality by containing released sediment to
the isolated, dry work area.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Choose the temporary watercourse diversion that will have the least amount of disturbance to the
waterbody and the surrounding area.
• Sequence the work to minimize the length of channel that will be bypassed.
• Use hydraulic modeling to determine the size and shape of the flume bypass. Refer to Appendix A for
the specified flood risk calculation, which can be used to determine the design storm for sizing of WIBs
and flumes, based on consideration of service life and the acceptable level of risk, which should be no
greater than 5%. A temporary flume bypass should, as a minimum, be sized to convey the 2
year event, unless otherwise approved by the relevant regulatory agency.
• Include a contingency plan on the drawings documenting which flows will overtop the system, the
steps to take in the event of a breach and a plan to remove the equipment and other material from the
floodplain.
• Keep spill kits and spill response plan onsite in the event deleterious substances enter the water body.
Design
• See example of site set up in Figure C8 and "Flume Bypass' design
detail in Figure C9.
• Ensure flume allows for fish passage.
• Install WIB at the inlet and outlet of the flume to prevent the entry
of water into the work area.
• Install the outlet of the flume such that it facilitates the gradual and
safe re-entry of fish into the watercourse or, alternatively, install a
ministry -approved fish screen at the inlet so as to prevent fish from
entering the flume.
Appendix C: Best management practices for in and near water works Page C-17
Erosion and Sediment Control Guide for Urban Construction
Attempt to minimize erosion and turbidity at the outlet by installing a splash pad.
• Ensure that the designer I engineer documents any deviation from the approved design and keeps the
documented changes on site.
Figure C8: Application of a flume bypass to divert stream flows around a dry work area
Installation
• Secure the pipe at intervals based on its length and size.
• Install the WIB starting from the banks working inwards towards the center of the channel.
Ensure a tight seal where the pipe and the WIB meet.
Inspection and maintenance
• Inspect the flume system weekly after every rainfall and significant snowmelt event and keep a
record of the inspection.
Immediately remove any debris collected at the upstream end of the system.
• Repair concerns, any displacements or failures within 48 hours of being identified, or sooner if
environmental receptors are at imminent and foreseeable risk of adverse impact.
Decommissioning
Stabilize the new channel prior to the return of flows so as to minimize sediment released.
• Follow sequencing shown on the construction drawings.
Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-18
DIRECTION
OF FLOW
METRE BAG
RIVER BED
Erosion and Sediment Control Guide for Urban Construction
PIPE SHOULD BE SIZED BY AN ENGINEER AND CONVEY FLOWS
AS DETERMINED THROUGH HYDRAULIC CALCULATIONS AND IN
CONSULTATION WITH THE CONSERVATION AUTHORITY
SECURELY ANCHOR AND SUPPORT
THE PIPE AS REQUIRED PENDING SITE
CONDITIONS USING METER BAGS,
NUTS AND BOLTS, OTHER
LONGITUDINAL PROFILE
APPROPRIATELY SIZED AND
SECURED PIPE TO CONVEY FLOWS
METRE BAGS OR OTHER
ANCHORING SYSTEM
UPSTREAM DAM CROSS-SECTION
APPROPRIATELY SIZED
STONE OR PATIO STONE
TO DISSIPATE ENERGY
METRE BAGS OR OTHER
ANCHORING SYSTEM
DOWNSTREAM DAM CROSS-SECTION
[:169RIM re71XV:IV":WX21&Y-1211C] _l161:QI1:I[0IWIIo]Z1011Ile] @'&IMA:YG121Hq:LIb-1Eel Z ZICM:111ISI:(ZI&&]:11:Alg5IOiW11.4*161:1011149:]:@G1Ito] a7Q11#1A i184:IMI1:0ZIIIS:01IYNI
TRCA ESC DESIGN DETAIL SCALE REV DATE
N.T.S. 1 MARCH 2019
rarer r%i n DRAWING TITLE DWG NO
.�%t'iOflR9rvatbn
"ud�" FLUME BY—PASS 10
DISCLAIMER TORONTO AND REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE USE R FOR REFERENCE ONLY
Figure C9: Design detail for application of a flume bypass to divert watercourse flows around a dry work area
Appendix C: Best management practices for in and near water works Page C-19
Erosion and Sediment Control Guide for Urban Construction
TEMPORARY WATERCOURSE DIVERSION - BYPASS PUMPING
Bypass pumping is a type of temporary watercourse diversion that uses an electrical or fuel -powered
generator to pump flows around the work area in order to create dry work area. All methods of temporary
diversion help maintain water quality by containing sediment in the dry, isolated work area. Bypass
pumping does not allow for fish passage and is most appropriate for short duration construction projects.
Potential permitting requirements
• Because this method does not allow for fish passage, fish collection and relocation activities are often
necessary.
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Choose the temporary watercourse diversion that will have the least amount of disturbance to the
waterbody and the surrounding area. Because bypass pumping does not allow for fish passage, it may
not be appropriate in sensitive streams and should only be applied for short duration projects.
• Sequence the work to minimize the length of channel that will be bypassed.
• Use hydraulic modeling to determine the pump size and other system requirements. Refer to Appendix
A for the specified flood risk calculation, which can be used to determine the design storm for sizing
WIBs and determining capacity of pumps used during bypass pumping. The specified flood risk
calculation is based on consideration of service life and the acceptable level of risk, which should be
no greater than 5% for in water BMPs. A temporary bypass pump system should, as a minimum,
be sized to accommodate the 2 year event, unless otherwise approved by the relevant
regulatory agency.
• Include a contingency plan on the drawings documenting which flows will overtop the system, the
steps to take in event of a breach and a plan to remove equipment and other material from the
floodplain.
• Keep spill kits and a spill response plan on-site in the event deleterious substances enter the water
body.
Design
• Refer to Figures C10 and C11 for examples of bypass pumping applications, and Figure C12 for a
design detail for bypass pumping.
• The design should attempt to minimize erosion and turbidity at the outlet by installing a type of splash
pad or by turning the discharging water upwards.
Appendix C: Best management practices for in and near water works Page C-20
Erosion and Sediment Control Guide for Urban Construction
In a fish -bearing stream, the pump intake must have a fish screen installed, operated, and maintained.
Guidance on fish screens is available in Fisheries and Oceans Canada's Freshwater Intake End -of -
Pipe Fish Screen Guideline (1995).
• Ensure that the designer I engineer documents any deviation from the approved design and keeps the
documented changes on site.
Inspection and maintenance
• Back-up pumps may need to be on-site in the event of a pump failure.
• Pumps should be monitored regularly when they are running. If pumps are running continuously, a
technician should be assigned to monitor the pumps — remotely or on site — after normal working
hours.
• Any deficiencies should be rectified within 48 hours or sooner if environmental receptors are at
imminent and foreseeable risk of adverse impact.
Decommissioning
• Ensure sediment removal and stabilization of work area is complete before the return of flows so as to
minimize sediment released downstream.
Follow sequencing shown on the construction drawings.
Restore all disturbed areas using native plant species.
Figure C10: Bypass pumping to divert stream flows around an isolated work area
Appendix C: Best management practices for in and near water works Page C-21
Erosion and Sediment Control Guide for Urban Construction
Figure C11: Energy dissipation at pump discharge location during bypass pumping
Appendix C: Best management practices for in and near water works Page C-22
NOTES:
1. ALL PUMP INTAKES SHOULD BE FITTED WITH A FISH
SCREEN IF THERE IS THE POTENTIAL FOR FISH OR
OTHER AQUATIC WILDLIFE ENTRAPMENT
2. PUMP AND FUELING ACTIVITIES SHOULD BE LOCATED
30 m AWAY FROM WATER BODY, IF FEASIBLE
DIRECTION
OF FLOW
LLLLL
CHANNEL BANK
APPROPRIATELY SIZED
Erosion and Sediment Control Guide for Urban Construction
TREATMENT OF SUMP DISCHARGE:
SEDIMENT BAG OR TREATMENT TRAIN APPROACH
SHOULD BE LOCATED IN A WELL -VEGETATED AREA AWAY
FROM WATER BODY. 30 m PREFERRED
TEMPORARY DAMS
(WATERPROOF ISOLATION
BARRIER) TO TIE INTO BANK
dP IN SUMP
CONDITION
ISOLATED
WORK AREA
APPROPRIATELY SIZED
STONE OR PATIO STONE
INSTALLED TO PREVENT
SCOUR, POINT PIPE END
TOWARDS SKY TO
DISSIPATE ENERGY
CLEAN WATER DIVERTED
AROUND WORK AREA
THIS DETAIL REPRESENTS AN IDEAL SCENARIO- SITE CONDITIONS VARY AND EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE TAILORED FOR EACH SITE AND PROJECT
TRCA ESC DESIGN DETAIL SCALE REV DATE
�{'� CiOfMefV8t�d1 N.T.S. 1 MARCH 2019
T»+role DRAWING TITLE DWG NO
ho -ft BY-PASS PUMPING 08
DISCLAIMER. TORONTO AND REGION CONSERVATION AUTHORITY (TRCA) IS NOT LIABLE FOR INFORMATION SHOWN ON THIS DRAWING. PLEASE USE IT FOR REFERENCE ONLY
Figure C12: Design detail for watercourse diversion using bypass pumping and dewatering to maintain a dry isolated work area
Appendix C: Best management practices for in and near water works Page C-23
Erosion and Sediment Control Guide for Urban Construction
SHEET PILE ISOLATION WALL
Steel sheet piles can be driven into the ground at the perimeter of an in -water work area to isolate it from
the water body. Often times, sheet pile walls are used when major excavation is required such as for the
construction of bridge abutments, piers and open cut installation. They are also installed when they will
remain part of the structure and in smaller water bodies when the impacts of the installation and removal
are predictable and there will be minimal disturbance.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Use hydraulic modeling to determine the height of the wall. Refer to Appendix A for the specified flood
risk calculation, which can be used to determine the design storm for sizing the wall, based on
consideration of service life and the acceptable level of risk, which should be no greater than 5%. A
sheet pile isolation wall should, as a minimum, be sized to hold back flows from the 2 year
event with some freeboard, unless otherwise approved by the relevant regulatory agency.
• Include a contingency plan on the drawings documenting which flows will overtop the wall, the steps to
take in the event of a breach and a plan to remove the equipment and other material from the
floodplain.
• Anticipate a large staging area to stage the sheet piles, the wall components and the heavy machinery
used to install it.
• Undertake a geotechnical investigation, if necessary, of the subsurface soil conditions and
groundwater level elevations.
• Keep spill kits and spill response plan on-site in the event deleterious substances enter the water body.
Design
See application of a sheet pile isolation wall in Figure C13.
• Consider using a brace on the inside depending on the height of the wall above grade and how deep
the sheets will extend into the ground.
Installation considerations
• Ensure that the sheets are installed perpendicular to the ground.
• Use sheets that are in good condition.
Appendix C: Best management practices for in and near water works Page C-24
Erosion and Sediment Control Guide for Urban Construction
Figure C13: Sheet pile isolation wall
• Confirm that the use of a vibratory hammer attachment is permitted as adjacent utilities or geotechnical
constraints may prevent its use.
• Avoid pulling up or re -driving the sheets as this may compromise their shape.
• Ensure that the designer / engineer documents any deviation from the approved design and keeps the
documented changes on site.
• Work from the top of bank and install in an upstream to downstream manner.
Inspection and maintenance
• Anticipate leaks if there were difficulties fitting sheets together.
• Inspect the sheet pile wall weekly, after every rainfall, significant
snowmelt and during ice -out and keep a record of the inspection.
• Repair failures or breaches of the wall within 48 hours of being
identified, or sooner if environmental receptors are at imminent and
foreseeable risk of adverse impact.
• Keep additional erosion and sediment control measures on site.
Appendix C: Best management practices for in and near water works Page C-25
Erosion and Sediment Control Guide for Urban Construction
Decommissioning
• Remove the sheet piles in a downstream to upstream manner.
Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-26
Erosion and Sediment Control Guide for Urban Construction
WATER -FILLED BLADDERS
(a.k.a. water -filled cofferdams, inflatable bladder dams)
Water -filled bladders are temporary barriers filled with available, on-site water that are placed within a
water body to create a dry, isolated work area. They are best suited for use where flow velocities are low
and water levels are not subject to large fluctuations.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
• Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Use hydraulic modeling and manufacturer's recommendations to determine the size of the bladder.
Refer to Appendix A for the specified flood risk calculation, which can be used to determine the design
storm for sizing of water -filled bladders, based on consideration of service life and the acceptable level
of risk, which should be no greater than 5%. A water -filled bladder should, as a minimum, be
sized to hold back flows from the 2 year event with some freeboard, unless otherwise approved
by the relevant regulatory agency.
• Use where flow velocities are low and water level fluctuations are predictable and insignificant.
• Provide a contingency plan on the drawings documenting which flows will overtop the barrier and
outline the steps to take in the event of a breach including a plan to remove the equipment and other
material from the floodplain.
• Keep spill kits and a spill response plan on-site in the event deleterious substances enter the water
body.
Design
• See application of a water filled bladder shown in Figure C14.
Adhere to design guidance provided by the product supplier.
Installation
• Install according to the manufacturer's recommendations.
• Ensure water bottom is level, free of debris or other material that may cause punctures or
displacements prior to positioning.
Fill any gaps with pea gravel bags to ensure a complete waterproof seal.
Appendix C: Best management practices for in and near water works Page C-27
Erosion and Sediment Control Guide for Urban Construction
• Ensure that only one end of the bladder is anchored to the bank or shoreline at a higher elevation than
the top of the bladder so that it doesn't obstruct flows during a high-flow event.
Ensure there's room for water to expand if bladders are used during freezing conditions.
Figure C14: Work area isolation using water -filled bladders
Inspection and maintenance
• Inspect the effectiveness of the bladder prior to the commencement of works and thereafter weekly,
after every rainfall and significant snowmelt event and keep a record of the inspection.
• Repair any displacements or failures within 48 hours of being identified, or sooner if environmental
receptors are at imminent and foreseeable risk of adverse impact.
• Keep additional erosion and sediment control measures on site.
• Immediately remove any debris that has collected in front of the bladder.
Decommissioning
• Avoid releasing the water directly into the watercourse so as to avoid altering the temperature of the
water body. Gradual release to an adjacent vegetated area is recommended in order to mitigate thermal
impacts.
Restore all disturbed areas using native plant species.
Appendix C: Best management practices for in and near water works Page C-28
Erosion and Sediment Control Guide for Urban Construction
PORTABLE DAM SYSTEM
A portable dam system is comprised of a reinforced, impermeable liner anchored over top of a series of
steel A -frames that are placed in the watercourse at pre -determined intervals. Through hydrostatic
pressure, the system is held in place and a dry, isolated work area can then be created.
Potential permitting requirements
• A License to Collect Fish for Scientific Purposes and/or Wildlife Scientific Collector's Authorization are
required from the MNRF in order to carry out any collection and relocation of fish or wildlife as part of
in water works.
• The proposed works should be reviewed with the local CA and applicable permitting agencies, which
may include DFO, MNRF and MECP (for species at risk sites or if water movement activities involved
trigger Permit to Take Water requirements).
Planning
Plan works to occur outside of the restricted activity fish timing windows (Table C1).
• Use hydraulic modeling and manufacturer's recommendations to determine the height of the portable
dam system. Refer to Appendix A for the specified flood risk calculation, which can be used to
determine the design storm for sizing of portable dams, based on consideration of service life and the
acceptable level of risk, which should be no greater than 5%. A portable dam system should, as a
minimum, be sized to hold back flows from the 2 year event with some freeboard, unless
otherwise approved by the relevant regulatory agency.
• Provide a contingency plan on the drawings documenting which flows will overtop the structure and
outline the steps to take in the event that high flows breach the barrier including a plan to remove
equipment and other material from the floodplain.
Keep spill kits and a spill response plan on-site in the event deleterious substances enter the water
body.
Design
See application of a portable dam shown in Figure C15.
Adhere to design guidance provided by the product supplier.
Installation
Install according to the manufacturer's recommendations.
• Ensure water bottom is mostly level and free of debris or other objects that may cause displacements.
Generally the portable dam system is flexible enough to seal over irregular surfaces.
Inspection and maintenance
• Inspect the effectiveness of the portable dam system prior to the commencement of works and
thereafter weekly, after every rainfall and significant snowmelt event and keep a record of the
Appendix C: Best management practices for in and near water works Page C-29
Erosion and Sediment Control Guide for Urban Construction
inspection.
• Repair any displacements or failures within 48 hours of being identified, or sooner if
environmental receptors are at imminent and foreseeable risk of adverse impact.
• Keep additional erosion and sediment control measures on site.
Decommissioning
Decommission according to the manufacturer's recommendations.
Restore all disturbed areas using native plant species.
Figure C15: Work area isolation with a portable dam system
Appendix C: Best management practices for in and near water works Page C-30
APPENDIX D:
SUMMARY OF LEGISLATION
RELEVANT TO EROSION
AND SEDIMENT CONTROL
Erosion and Sediment Control Guide for Urban Construction
APPENDIX D: SUMMARY OF LEGISLATION RELEVANT TO ESC
The following subsections describe the primary federal, provincial and municipal legislation relevant to
ESC during urban construction projects and how they regulate, or otherwise impact, sediment
management activities. The list provided herein is not exhaustive, and additional legislation may apply to
specific geographic areas or the regulation of certain activities occurring over the course of a construction
project (e.g. fish collection during in -water projects).
Federal
Fisheries Act (R.S.0 1985)
The Fisheries Act is administered by the Federal Department of Fisheries and Oceans and has broad
applicability to various activities that can impact fisheries and fisheries waters that (i) provide fish habitat
or (ii) support fish habitat opportunities at any life stage. Canadian fisheries waters include "all waters in
the fishing zones of Canada, all waters in the territorial sea of Canada and all internal waters of Canada.
The Act was subject to significant changes in 2019, which resulted in the re -instatement of previously
removed protections for all fish and fish habitat. The amended act also restored the prohibition of any
harmful alteration, disruption or destruction of fish habitat (HADD), which had been removed in the last
amendment to the Fisheries Act in 2013.
The Act requires that fish and fish habitat are protected during construction. With respect to construction
activities and sediment management, some of the key sections of the Act are summarized below.
• Section 34.4(1): This section states that no person shall carry on any work, undertaking or activity,
other than fishing, that results in the death of fish
• Section 35(1): This section states that no person shall carry on any work, undertaking or activity that
results in the harmful alteration, disruption or destruction of fish habitat
The Act lists several exceptions to the prohibitions in sections 34(1) and 35(1), for example, section
35(2)(b) which allows the harmful activity to occur if it has been authorized by the Minister.
• Section 36(3): This section states: "No person shall deposit or permit the deposit of a deleterious
substance of any type in water frequented by fish or in any place under any conditions where the
deleterious substance or any other deleterious substance that results from the deposit of the
deleterious substance may enter any such water." Deleterious substance is defined as follows:
a) "any substance that, if added to any water, would degrade or alter or form part of a process of
degradation or alteration of the quality of that water so that it is rendered or is likely to be
rendered deleterious to fish or fish habitat or to the use by man of fish that frequent that water, or
b) any water that contains a substance in such quantity or concentration, or that has been so
treated, processed or changed, by heat or other means, from a natural state that it would, if
added to any other water, degrade or alter or form part of a process of degradation or alteration of
the quality of that water so that it is rendered or is likely to be rendered deleterious to fish or fish
habitat or to the use by man of fish that frequent that water"
Appendix D: Summary of Legislation Relevant to ESC Page D-1
Erosion and Sediment Control Guide for Urban Construction
Construction site runoff could fall in line with this definition of deleterious substance if the concentrations
of sediment and other adsorbed compounds (e.g. heavy metals, nutrients) were high enough to cause
detriment to fish or fish habitat.
• Sections 38(4) and 38(5). These sections describe duties to notify the appropriate authority of any
serious harm to fish — a violation of Section 35(1) — and any deposit of a deleterious substance — a
violation of Section 36(3). The duty to notify applies to a person who owns, manages or has control of
the work or a person who caused or contributed to the harm.
• Section 38(6). This section requires any person responsible for the harm in Section 38(4) or the
deposit of deleterious material in Section 38(5) to take all reasonable measures to prevent the
occurrence or to counteract, mitigate or remedy adverse effects resulting from the occurrence.
Section 78(6). This section describes the due diligence defence, stating "no person shall be convicted
of an offence under this Act if the person establishes that the person (a) exercised all due diligence to
prevent the commission of the offence; or (b) reasonably and honestly believed in the existence of
facts that, if true, would render the person's conduct innocent. The concept of due diligence and a
discussion of how it can be exercised is provided in Chapter 5.0 of the Guide.
Common construction activities that have the potential to result in violations of Sections 35(1) and 36(3)
of the Act include:
• Realignment or intrusion into a stream channel;
• Restrictions to fluvial processes;
• Impacts to riparian corridors;
• Infilling of habitats, wetlands and coastal marshes;
• Channelizing and piping headwater inputs;
• Discharges of deleterious substances from construction sites, and
• Dewatering operations
For construction projects involving in or near water works, determining whether a Fisheries and Oceans
Canada review and/or authorization is required must be done through an online self -screening process.
This is discussed in Chapter 10.0.
Species At Risk Act (S.C. 2002)
Canada's Species At Risk Act (SARA) was created to "prevent wildlife species from being extirpated or
becoming extinct, to provide for the recovery of wildlife species that are extirpated, endangered or
threatened as a result of human activity, and to manage species of special concern to prevent them from
becoming endangered or threatened" Environment and Climate Change Canada is responsible for the
overall administration of SARA, however the Act gives Fisheries and Oceans Canada responsibility for
the protection of aquatic species and habitat at risk.
The provisions in the Act that protect endangered, threatened or extirpated species apply automatically
on federal lands and waters. On provincial, territorial or privately owned land, SARA applies only to the
aquatic species and migratory birds (if also included in the Migratory Birds Convention Act) that are listed
in Schedule 1 as endangered, threatened or extirpated. The Act does allow for other Schedule 1 species
Appendix D: Summary of Legislation Relevant to ESC Page D-2
Erosion and Sediment Control Guide for Urban Construction
to be protected on non-federal lands in cases where there is no provincial or territorial legislation in place
that protects them, but it would require that an order be issued, which would require a public consultation
process.
In addition to the protection of the individual species, SARA also contains provisions that protect their
habitat. These provisions would apply to construction activities, and in water works in particular,
occurring on sites that are known habitat for species at risk. The applicable provisions that protect habitat
are:
• Section 33. No person shall damage or destroy the residence of one or more individuals of a wildlife
species that is listed as an endangered species or a threatened species, or that is listed as an
extirpated species if a recovery strategy has recommended the reintroduction of the species into the
wild in Canada.
• Section 58(1). No person shall destroy any part of the critical habitat of any listed endangered species
or of any listed threatened species — or of any listed extirpated species if a recovery strategy has
recommended the reintroduction of the species into the wild in Canada — if:
a) the critical habitat is on federal land, in the exclusive economic zone of Canada or on the
continental shelf of Canada;
b) the listed species is an aquatic species; or
c) the listed species is a species of migratory birds protected by the Migratory Birds Convention
Act, 1994.
In the Act, critical habitat is defined as: "the habitat that is necessary for the survival or recovery of a listed
wildlife species and that is identified as the species' critical habitat in the recovery strategy or in an action
plan for the species."
Fisheries and Oceans Canada has online mapping available that identifies aquatic species at risk habitat,
and which can be used to determine whether a development site would be subject to SARA prohibitions.
Where a development project requires the undertaking of activities prohibited under Sections 33 and
58(1) of SARA, approval is required from Fisheries and Oceans Canada. Construction activities that are
being carried out in or near water can be screened using Fisheries and Oceans Canada's online
screening process in order to establish whether permits and/or authorizations under SARA or the
Fisheries Act are required. The self -screening process should be undertaken prior to application for a
SARA permit.
Environmental Protection Act (S.C. 1999)
Administered by Environment and Climate Change Canada and Health Canada, the Environmental
Protection Act is defined as "an Act respecting pollution prevention and the protection of the environment
and human health in order to contribute to sustainable development". The Act also recognizes the
importance of pollution prevention, and the management and control of toxic substances and hazardous
waste, in reducing threats to Canada's ecosystems and biological diversity.
Section 64 of CEPA states:
"A substance is toxic if it is entering or may enter the environment in a quantity or concentration or under
conditions that:
Appendix D: Summary of Legislation Relevant to ESC Page D-3
Erosion and Sediment Control Guide for Urban Construction
a) Have or may have an immediate or long-term harmful effect on the environment or its biological
diversity;
b) Constitute or may constitute a danger to the environment on which life depends; or
c) Constitute or may constitute a danger to human life or health in Canada."
Navigation Protection Act (R.S.C. 1985)
The Navigation Protection Act regulates any interferences with navigation in Canada's navigable waters.
Administered by Transport Canada, the Act was previously known as the Navigable Waters Protection
Act until amendments came into effect in April 2014. Navigable water is defined as:
"A canal and any other body of water created or altered as a result of the construction of any work means
a body of water, including a canal or any other body of water created or altered as a result of the
construction of any work, that is used or where there is a reasonable likelihood that it will be used by
vessels, in full or in part, for any part of the year as a means of transport or travel for commercial or
recreational purposes, or as a means of transport or travel for Indigenous peoples of Canada exercising
rights recognized and affirmed by section 35 of the Constitution Act, 1982, and
(a) there is public access, by land or by water;
(b) there is no such public access but there are two or more riparian owners; or
(c) Her Majesty in right of Canada or a province is the only riparian owner."
They are waterways that are able to be navigated by the public as a highway. When considering whether
a waterway is navigable water, the Ministry takes into consideration its specific characteristics (e.g.
whether it can accommodate a vessel based on size and dimensions) and any evidence that the
waterway is, has been, or will be used for navigation by the public.
In the Act, some provisions are specific to navigable waters listed in the schedule, including lakes, rivers,
riverines and parts of oceans that are known to be the busiest in Canada with respect to navigation.
Works carried out in the water bodies listed in the schedule, require the Minister's approval if, after
screening, it is determined that they will substantially interfere with navigation. In the Act, 'work' is defined
as "any structure, device or thing, whether temporary or permanent, that is made by humans. It also
includes the dumping of fill or the excavation of materials from the bed of any navigable water.'
Water bodies not listed in the schedule do not require approval under the NPA, nor do works classified as
'minor works'. Minor works, which are defined in the Minor Works Order, are referred to as 'designated
works' in the NPA. These projects may proceed without approval, even in scheduled water bodies,
provided that the work is carried out in accordance with the legal requirements in the Order.
Under the Act, any construction activities that would interfere with navigation within scheduled navigable
waters, and which cannot be classified as 'minor works', would require a 'Notice to the Minister' (of
Transportation). The Ministry screens these projects to determine whether they should be allowed to
proceed, whether they will require an approval, and what terms and conditions should be tied to the
approval. The key sections of the Act that are the most relevant to construction site sediment
management are provided below. The Act is most applicable to in water construction works, since these
activities can directly interfere with navigation.
Appendix D: Summary of Legislation Relevant to ESC Page D-4
Erosion and Sediment Control Guide for Urban Construction
Section 3. It is prohibited to construct, place, alter, repair, rebuild, remove or decommission a work in, on,
over, under, through or across any navigable water that is listed in the schedule except in accordance
with this Act or any other federal Act.
Section 21. No person shall throw or deposit or cause, suffer or permit to be thrown or deposited any
sawdust, edgings, slabs, bark or like rubbish of any description whatever that is liable to interfere with
navigation in any water, any part of which is navigable or that flows into any navigable water.
Section 22. No person shall throw or deposit or cause, suffer or permit to be thrown or deposited any
stone, gravel, earth, cinders, ashes or other material or rubbish that is liable to sink to the bottom in any
water, any part of which is navigable or flows into any navigable water, where there is not a minimum
depth of 36 metres of water at all times, but nothing in this section shall be construed so as to permit the
throwing or depositing of any substance in any part of a navigable water if it is prohibited by or under any
other federal Act.
Section 23. No person shall dewater any navigable water.
For construction activities that may interfere with navigable water, online self -screening through Transport
Canada should be undertaken in order to determine if the works are permitted or whether they will require
the issuance of a Navigation Protection Program approval.
Provincial
Water Resources Act (R.S.O. 1990)
The Ontario Water Resources Act (OWRA), administered by the Ontario Ministry of the Environment,
Conservation and Parks (MECP), is the province's most significant legislation that regulates water quality
and quantity. Its purpose, as stated in the Act itself is "to provide for the conservation, protection and
management of Ontario's waters and for their efficient and sustainable use, in order to promote Ontario's
long-term environmental, social and economic well-being'.
The Act prohibits the discharge of polluting material in Section 30(1), which states:
"Every person that discharges or causes or permits the discharge of any material of any kind into or in
any waters or on any shore or bank thereof or into or in any place that may impair the quality of the water
of any waters is guilty of an offence."
To determine what is meant by impairment of the water, it is necessary to refer to Section 1(3) of the Act,
which explains the circumstances under which water will be deemed to be impaired. It states:
"For the purposes of this Act, the quality of water shall be deemed to be impaired by the discharge of
material if the material or a derivative of the material enters or may enter the water, directly or indirectly,
and,
(a) the material or derivative causes or may cause injury to or interference with any living organism
that lives in or comes into contact with, (i) the water, or (ii) soil or sediment that is in contact with the
water;
Appendix D: Summary of Legislation Relevant to ESC Page D-5
Erosion and Sediment Control Guide for Urban Construction
(b) the material or derivative causes or may cause injury to or interference with any living organism as
a result of it using or consuming, (i) the water, (ii) soil or sediment that is in contact with the water, or
(iii) any organism that lives in or comes into contact with the water or soil or sediment that is in
contact with the water;
(c) the material or derivative causes or may cause a degradation in the appearance, taste or odour of
the water;
(d) a scientific test that is generally accepted as a test of aquatic toxicity indicates that the material or
derivative, in diluted or undiluted form, is toxic;
(e) peer-reviewed scientific publications indicate that the material or derivative causes injury to or
interference with organisms that are dependent on aquatic ecosystems; or
(f) the material or derivative has a prescribed characteristic or is a prescribed material."
This definition is directly applicable to construction projects, since sediment and associated contaminants
discharged from the site can cause injury to, and interference with, aquatic organisms and also cause
degradation in the appearance of the water. The Act also requires, in Section 30(2), that the Ministry be
notified when material that may impair the quality of the water escapes or is discharged.
The OWRA (section 34) also governs water taking/movement, which is a common occurrence during
constructions projects, particularly when groundwater dewatering is required. Chapter 9.0 provides
additional information on permits for water taking under the OWRA and when they are required.
Lakes and Rivers Improvement Act (R.S.O. 1990)
The Ontario Lakes and Rivers Improvement Act (LRIA) is administered by the Ontario Ministry of Natural
Resources and Forestry. The Act regulates the management, protection, preservation and use of Ontario
waters and the lands under them. It also provides for the management, perpetuation and use of the fish,
wildlife and other natural resources dependent on lakes and rivers. One of its key focuses is the
regulation of dams.
The LRIA requires an approval for the construction of a dam in any lakes and rivers in the province. As
stated in Section 14(1), "No person shall construct a dam in any lake or river in circumstances set out in
the regulations without the written approval of the Minister for the location of the dam and its plans and
specifications."
This provision is highly relevant to in -water construction works which often require isolation of work areas
through the damming and diversion of water in lakes and rivers. Because this approval requirement
overlaps with the requirements for a Conservation Authority permit (see Chapter 10.0), the MNRF has
determined that areas of the province that are within the jurisdiction of a CA do not have to apply for an
LRIA section 14 approval. In areas of the province that are not CA jurisdiction, these kinds of projects
would require Section 14 approval obtained directly form the MNRF.
The other LRIA provision that is relevant to construction activities is 36(1), which states: "No person shall
throw, deposit, discharge or permit the throwing, depositing or discharging of any substance or matter in a
lake or river, whether or not the lake or river is covered by ice, or on the shores or banks of a lake or river
under circumstances that conflict with the purposes of this Act." Based on the stated purposes of the Act,
which are primarily to protect and preserve lakes and rivers, the discharge of elevated concentrations of
Appendix D: Summary of Legislation Relevant to ESC Page D-6
Erosion and Sediment Control Guide for Urban Construction
sediment and associated contaminants from construction sites could be considered a violation of this
section of the LRIA.
Environmental Protection Act (R.S.O. 1990)
The Ontario Environmental Protection Act (EPA), administered by the MECP, is one of the primary pieces
of pollution control legislation in the province. It addresses various aspects of environmental protection,
ranging from waste management to renewable energy. The EPA provisions that are most relevant to
construction site sediment management are those that prohibit discharges of contaminants into the
environment and those that address spills. The applicable provisions are:
Section 14(1). Subject to subsection (2) but despite any other provision of this Act or the regulations, a
person shall not discharge a contaminant or cause or permit the discharge of a contaminant into the
natural environment, if the discharge causes or may cause an adverse effect.
Section 92(1). Every person having control of a pollutant that is spilled and every person who spills or
causes or permits a spill of a pollutant shall forthwith notify the following persons of the spill, of the
circumstances thereof, and of the action that the person has taken or intends to take with respect thereto,
(a) the Ministry;
(b) any municipality within the boundaries of which the spill occurred or, if the spill occurred within
the boundaries of a regional municipality, the regional municipality;
(c) where the person is not the owner of the pollutant and knows or is able to ascertain readily the
identity of the owner of the pollutant, the owner of the pollutant; and
(d) where the person is not the person having control of the pollutant and knows or is able to
ascertain readily the identity of the person having control of the pollutant, the person having
control of the pollutant.
There are also several other provisions related to spills, including duties to have spills prevention plans —
Section 91.1 — and to mitigate adverse effects arising from the spill and restore impacted areas - Section
93(1). Guidance on spills response and control plans is provided in Section 7.7.
Ontario Conservation Authorities Act (R.S.O 1990)
The Conservation Authorities Act, administered by the MNRF, was first passed in 1946 at which time it
authorized the creation of Conservation Authorities (CAs) throughout Ontario. Under the Act, individual
regulations have been passed for each CA entitled "Regulation of Development, Interference with
Wetlands and Alterations to Shorelines and Watercourses" (Ontario Regulations 42/06 and 146/06
tol82/06). The regulations are meant to control flooding and to prevent property damage, erosion,
pollution and loss of life. They allow CAs to regulate development and other activities taking place within
valley and stream corridors, wetlands and associated areas of interference, and the Lake Ontario
waterfront. These areas are often referred to collectively as the 'regulated area'. The regulations made
under the Act prohibit, regulate and require permission for:
• Straightening, changing, diverting or interfering in any way with the existing channel of a river, creek,
stream or watercourse, or for changing or interfering in any way with a wetland.
Appendix D: Summary of Legislation Relevant to ESC Page D-7
Erosion and Sediment Control Guide for Urban Construction
• Development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or
pollution or the conservation of land may be affected by the development.
As such, construction activities that take place in an area regulated under the CA regulations require a
permit, since these activities by their nature involve the movement and/or placement of fill and alteration
of drainage patterns. These activities can have significant impacts on flooding risk, erosion, pollution and
the conservation of land. Discharging stormwater into the regulated area may also require a CA permit
even if the development itself is not being constructed in the regulated area, as these activities can
increase risks of pollution, flooding and erosion.
Section 28(3) of the Conservation Authorities Act states that CAs, under their regulations, may issue
permission that is subject to conditions that must be met, or the permit can be cancelled. Some
examples of conditions that are typically applied include: the use of phased ESC plans, the
implementation of inspections and maintenance programs, and adherence to construction timing
windows.
Chapter 9.0 provides additional guidance on CA permits and regulated areas.
Ontario Endangered Species Act IS. O. 2007)
The Ontario Endangered Species Act (ESA) is administered by the MECP. Its purpose is to identify and
protect species at risk and their habitats, and to promote recovery of these species and stewardship
activities that will assist in their protection and recovery. Unlike the federal SARA, the Ontario ESA
applies to any land — public or private — that contains, or provides habitat for, endangered species. Two
regulations have been created under the Act: a general regulation under the ESA (O.Reg. 242/08) and
the Species at Risk in Ontario List (O.Reg. 230/08). The latter lists all extirpated, endangered, threatened
and special concern species in the province.
In the Act, the provision in Section 10 protects the habitat of species at risk, stating "No person shall
damage or destroy the habitat of, (a) a species that is listed on the Species at Risk in Ontario List as an
endangered or threatened species; or (b) a species that is listed on the Species at Risk in Ontario List as
an extirpated species, if the species is prescribed by the regulations for the purpose of this clause."
In Ontario development applications are screened to determine whether there are any at risk species on
the site. If at risk species are believed to be on the site and/or have been observed on the site, the
activities planned may require an Endangered Species Act permit or authorization. Permits and
authorizations issued will often be subject to conditions and requirements based on MECP
recommendations on procedures and protection measures that will best safeguard the species from
harm.
In an effort to enhance the protection of aquatic species -at -risk during construction activities, the MNRF,
in partnership with the Credit Valley Conservation Authority, MECP, and Fisheries and Oceans Canada,
released a protocol titled Silt Smart: Erosion and Sediment Control Effectiveness Monitoring and Rapid
Response Protocol for Large Urban Development Sites (version 1.2). It outlines a consistent
effectiveness monitoring methodology to protect the health of sensitive streams and habitats in areas
undergoing large urban development. Based on this protocol, which was released in 2012, sensitive
streams include those that support species -at -risk and coldwater species such as the provincially
endangered Redside Dace, Atlantic Salmon and Brook Trout.
Appendix D: Summary of Legislation Relevant to ESC Page D-8
Erosion and Sediment Control Guide for Urban Construction
Planning Act (R.S.O. 1990)
The Planning Act, administered by the Ministry of Municipal Affairs and Housing, sets out the ground
rules for land use planning in the province. It defines the parties who can control land use and how they
can do so. It provides the basis for, among other things, preparing official plans, regulating and controlling
land uses through zoning bylaws and minor variances, and dividing land into separate lots for sale or
development through a plan of subdivision or a land severance. CAs are "public commenting bodies"
under the Planning Act, which requires that they be notified regarding municipal policy documents and
planning and development applications under the Act. As such, CAs provide comments to the
municipality/planning approval authority on these documents and applications. The planning/development
applications CAs are required to review and comment on often include ESC plans.
Section 3 of the Planning Act enables the province to issue policy statements on land use planning
matters of provincial interest. The current Provincial Policy Statement (PPS), released in 2014, details
several provincial interests that are relevant to ESC and environmental protection during land
development in general. These include Natural Heritage (Section 2.1), Water (Section 2.2), and Natural
Hazards (Section 3.1). Under each of these categories, the PPS lays out how these interests - the
protection of natural heritage and water features and the protection of human health and infrastructure
from natural hazards — must be addressed. All planning/land use decisions are required to be consistent
with the PPS and provincial plans such as the Niagara Escarpment Plan (2017), the Oak Ridges Moraine
Conservation Plan (2017), the Greenbelt Plan (2017), and the Growth Plan for the Greater Golden
Horseshoe (2017).
Conservation authorities have been delegated the responsibility of representing the provincial interest on
natural hazards encompassed by Section 3.1 of the PPS. As such, they are required to review and
provide comments on municipal policy documents (e.g. Official Plans) and applications submitted
pursuant to the Planning Act.
Municipal
Section 142 of the Municipal Act (S.O. 2001) grants municipalities the power to regulate "site alteration",
and pass associated bylaws for activities and undertakings that disturb the natural ground conditions and
alter soil sediment distribution. This section is comprehensive and proactive in controlling land -disturbing
activities early in the development process. Bylaws require permits to be secured for site alterations that
routinely require environmental assessments and as a condition of approval erosion and sediment control
plan and/or Environmental Control Plan.
Each municipality has its own process to allow earthworks and the construction process to be initiated
either through a top soil bylaw, tree removal bylaw, site alternation permit or pre -servicing agreements.
The ESC plan forms a key component of this process and the land owner is required to meet the
conditions of the identified municipal approval process. The conditions of the approval generally include a
letter of credit for a predetermined percentage of the cost to implement, maintain and decommission the
ESC plan.
Appendix D: Summary of Legislation Relevant to ESC Page D-9
APPENDIX E:
EROSION RISK ASSESSMENT
APPROACHES
Erosion and Sediment Control Guide for Urban Construction
APPENDIX E: EROSION RISK ASSESSMENT APPROACHES
Revised Universal Soil Loss Equation (RUSLE) approach
A number of methods have been established to assess potential erosion (soil loss) within a defined
geographic area, but the most common is the Revised Universal Soil Loss Equation (RUSLE). RUSLE
evolved from the Universal Soil Loss Equation (USLE) - an empirical model which was developed in the
1960s by Walter H. Wischmeier and Dwight D. Smith. The revised version of USLE, released in 1992, is
a computerized version of the model that incorporated improvements in many of the factor estimates.
RUSLE is used to calculate soil loss based on the five contributing factors described below, which are
explained in detail in Revised Universal Soil Loss Equation for Application in Canada (RUSLE FAC): A
Handbook for Estimating Soil Loss from Water Erosion in Canada (Wall et al., 2002). Guidance on
performing RUSLE calculations for construction projects, including examples, are available in the City of
Calgary Water Resources Erosion and Sediment Control Guidelines (2017).
The equation is:
A=RxKxLSxCxP
The factors/variables shown in the equation are defined as follows:
Soil loss (A) I Average annual soil loss for the defined geographic area, expressed as a weight per unit
area (i.e. tonnes/hectare). This is the product of the other five factors described below.
Soil erodibility (K factor) I A quantifiable measure of how susceptible a soil is to erosion based on
characteristics such as texture, structure, permeability, organic matter content, and the way the soil is
affected by seasonal changes.
Slope (LS factor) I Based on site topography, this factor considers drainage patterns and the length,
steepness and shape of the slopes in the study area.
Rainfall and runoff (R factor) I This factor considers the erosivity of rainfall and runoff, taking into
account rainfall intensity and the volume of overland flow generated during the event. This factor also
encompasses seasonal variations in the erosivity of rainfall events (e.g. high erosivity summer
thunderstorms, high runoff generation during rain on frozen soils).
Crop and vegetation management factor (C factor) I Sometimes referred to as the 'cover' factor, this
is a measure of how effective a given ground cover is at preventing erosion. While agricultural
applications are primarily concerned with crop/vegetative cover, C factors have now been established for
ground covers used in construction applications, like erosion control blankets.
Support practice factor (P Factor) I This factor considers practices applied to prevent soil loss by
reducing runoff volumes and flow rates. In construction applications, support practices can be considered
sediment control practices, particularly those that result in alterations of flow rates and pathways. Once
potential soil loss is calculated based on the four factors above, the support practices are incorporated
(as part of ESC plan development) in order to determine the extent to which they can help mitigate that
anticipated soil loss.
Once soil loss is calculated for a defined geographic area using RUSLE, the values can be compared
with those in Table E1 below from RUSLE FAC (2002). This allows for evaluation of the extent of soil
loss/erosion expected and how it compares to the maximum tolerable soil losses defined in the
Appendix E: Erosion Risk Assessment Approaches Page E-1
Erosion and Sediment Control Guide for Urban Construction
document. Based on the outcome of that assessment, additional support practices may need to be
added if predicted erosion levels are too high. Alternatively, the C factor could be adjusted by increasing
cover on bare soil areas to make them less vulnerable to erosion.
Table Ell: Potential soil erosion classes
Very low
< 6
Low
6 - 11
Moderate
11 -22
High
22-33
�LSevere
> 33
Source: RUSLE for Application in Canada: A Handbook for Estimating Soil Loss from Water Erosion in Canada (Wall
et al., 2002)
Ministry of Transportation's qualitative risk assessment approach
The Ontario Ministry of Transportation (MTO) has developed a qualitative approach to erosion risk
assessment as part of their Environmental Guide for Erosion and Sediment Control During Construction of
Highway Projects document (MTO, 2015). The approach is based on some of the factors defined in RUSLE
and includes the following items:
i. An overview of the risk of a broad study area; and
ii. A detailed assessment of the construction project.
Overview risk assessment.
The overview risk assessment for erosion and sediment control is a general classification that can be
applied to larger study areas or areas identified as having sensitive downstream receiving features. The
overview risk assessment involves separating the study area into areas (polygons) of similar erosion
potential and assigning an erosion potential risk rating (low, moderate or high) to each. The base map
used to select polygons should be developed at a scale suitable to the size and topography of the study
area. The scale should be sufficient to discern areas with different erosion risk levels. Polygon sizes
between 0.5 and 10 ha are recommended. The method MTO outlined also involves determining a
consequence rating for each polygon, which involves estimating the risk (low, moderate or high) of
consequences occurring in the event of ESC failure within that polygon. The consequence rating is
based on potential ecological, legal or project consequences. The assessment results are reported in a
table where polygons are numbered and their associated erosion risk and consequence ratings are listed
along with a brief justification for the ratings.
An overview report is also completed in support of the risk assessment and includes the following items:
i. Site Description
ii. Existing Conditions
iii. Anticipated Project Activities
iv. Considerations for ESC Plan Development
Appendix E: Erosion Risk Assessment Approaches Page E-2
Erosion and Sediment Control Guide for Urban Construction
Additional guidance on how to establish polygons of like erosion potential is provided in Section 5.2 and
Appendix B of MTO's Environmental Guide for Erosion and Sediment Control During Construction of
Highway Projects (2015).
Detailed assessment.
A detailed assessment is the final step within MTO's Risk Assessment and is done to determine the
overall level of risk from construction activities and specifies the appropriate level of effort that is required
as it relates to erosion and sediment control onsite. The detailed assessment is typically documented
within a technical memo in support of the proposed construction activities.
Hybrid qualitative ERA approach
The approach detailed in this section represents a hybrid of the MTO approach and the RUSLE method
described in Appendix E. While qualitative like the MTO approach (described in the 2015 Environmental
Guide for Erosion and Sediment Control During Construction of Highway Projects), it differs in that it does
not consider risk classification of consequences and is instead focused solely on estimating erosion risk.
The hybrid approach involves the following steps:
1) Dividing the site into polygons of like erosion potential that are delineated by using topographical and
soils maps and aerial photographs. The base map used to select polygons should be developed at a
scale suitable to the size and topography of the study area. The scale should be sufficient to discern
areas with different erosion risk levels. Polygon sizes between 0.5 and 10 ha are recommended.
2) For each polygon, compile data on soil characteristics (K factor), topography (LS factor), and
anticipated ground cover, if any (C factor).
3) Using the risk classification tables provided in section 6.2.3 of the ESC Guide for Urban Construction
(2019), rate each polygon as having a high, moderate, or low risk of erosion.
4) Select best practices most appropriate for mitigating erosion based on the estimated risk. See BMP
selection guidance in table 6.6 of the Guide.
5) Prepare ESC plan, specifying best practices for each polygon based on what is determined through
the hybrid ERA approach.
6) Repeat this process for each construction stage with a distinct ESC plan, e.g. topsoil stripping &
grading, site servicing, building construction.
Appendix E: Erosion Risk Assessment Approaches Page E-3
APPENDIX F: ESC INSPECTION
REPORT TEMPLATE
Project
Inspector Na
Recipients:
List of report recipients and e-mail
ACTION ITEMS:
Weather/Time:
Reason for
Item
Number
Location
Description
Date
Completion
Date
Weeks
Recurring
a table listing active%ngoing maintenance, repair and replacement requirements can be used to
summarize a detailed report. This can provide quick reference "Checklist/To Do"for the contractor.
Detailed ESC Report to Follow:
Item #:
Clear and concise description of what should be done... action item including a representative date
stamped photo of the concern.
This should be done for each item every inspection.
MAP — attach a site plan/drawing and note the action items (new and recurring) that appear on the
corresponding inspection report to ensure locations of corrective/actions items are clear. This is
particularly useful for large projects.
APPENDIX G:
RESTORATION GUIDELINES
Erosion and Sediment Control Guide for Urban Construction
APPENDIX G: RESTORATION GUIDELINES
A. Restoration Planning, Implementation and Monitoring
Through the planning and/or permitting of a project, areas are often identified for restoration to mitigate
development impacts or to enhance the natural heritage system. These areas include sites outside the
existing natural features including the buffer and sites within the natural heritage system where
construction disturbance was deemed unavoidable. The goal of restoration work is to establish natural
self-sustaining vegetation that contributes to the surrounding ecosystem function and provides valuable
habitat. Many resources go into the design and implementation of restoration projects and these projects
require thoughtful planning, proper implementation as well as post -construction monitoring and
maintenance.
1. Planning
It is critical to the success of any restoration project that the site conditions are well understood by the
designers and that appropriate plants are selected. Existing habitat conditions must be considered as well
as post -development conditions which may affect plantings. Drawings must include a plan view showing
planting locations, species (common and scientific names) and numbers. Soil preparation requirements,
the type of planting stock, the appropriate timing of planting and seed application as well as any relevant
planting details should also be included.
Plant selection and project design should be completed based on the following:
i. Soil type should be determined and the health of the soils should be assessed to properly plan for
soil amendments or any site preparation that will be required. TRCA's Preserving and Restoring
Healthy Soil: Best Practices for Urban Construction is a valuable resource regarding the creation
a healthy soil environment following construction.
ii. As soil compaction from construction activities is a key limiting factor to the success and
establishment of restoration plantings, the remediation of compaction must be considered at the
design stage and outlined on the plans.
iii. Plants should be native species and suitable given the soil, moisture, and light conditions of the
site as well as any site specific stressors. Cultivars of native species are generally not acceptable
and invasive species are not permitted. Rare species should be avoided as well as species that
are often mislabeled including Viburnum trilobum and Celastrus scandens.
iv. Planting plans should be based on natural vegetation communities found in the region and plant
groupings should be selected accordingly. Designers should consider the natural features on the
site and in the adjacent areas as well as have an understanding of existing vegetation
communities and the landscape context. Plants should be arranged in a layout that mimics
natural conditions.
V. A range of early successional plants should be used to provide the biodiversity necessary to
support the development of a future natural self-sustaining community. Late successional species
should be included in areas where a source of seed does not exist in order to promote
succession but should not make up the majority of species in the plant list.
vi. Where possible, native species can be salvaged from the area to be developed and used as part
of the restoration planting. If the area is composed of native plant species, it may also be possible
to salvage sod mats as a source of seed and an effective erosion control measure.
vii. Planting densities should achieve full coverage of the site with shrubs planted at 1 metre on
centre and trees planted at 5 metres on centre. Higher densities are required for live stake
plantings and lower densities or nodal plantings may be acceptable depending on the targeted
community and the size of the area to be restored.
viii. Predation and herbaceous competition can limit the growth and survival of planted material,
Appendix G: Restoration Guidelines Page G-1
Erosion and Sediment Control Guide for Urban Construction
especially in the initial years following planting. The need for mulch and rodent guards must be
assessed in order to protect young tree stems. In some cases, larger planting stock may be the
only way to outcompete and ensure planting success.
ix. In areas where invasive species are a particular problem, eradication of these species may
become a component of the restoration initiative.
X. To inhibit the establishment of invasive species within a restoration area, all exposed soils should
be stabilized with a native seed mix that includes a nurse crop.
2. Implementation
Even with good design, proper implementation is necessary to ensure long-term success of the planted
material.
i. Following construction, soil conditions should be reassessed prior to planting to evaluate the
amount of soil compaction and/or the need for soil amendments. Soil compaction remediation as
well as the addition of fertile soil or amendments will be needed if the area to be restored was
part of the active construction site.
ii. The location of restoration work and the type of plant material will determine the timing of the
planting. The following should be considered when scheduling the restoration work:
• Bareroot stock and live stakes should only be installed while dormant in spring or after
leaf fall in autumn.
• Planting during wetter months (May and September) is ideal. Balled and burlapped as
well as container -grown stock can be installed at any time during the growing season, if
adequate water is supplied.
iii. Seeding should occur as soon as possible following the completion of work. Seed mixes should
not be applied during the drought -prone season (i.e. June through August), unless adequate
irrigation can be supplied. Works occurring during the summer and winter months should specify
interim erosion control measures.
3. Post -Construction Monitoring and Maintenance
While properly selected native plant material will become resilient to climatic variations, all newly planted
plants are sensitive until sufficient root growth has developed. Because planting is stressful on the plant
material, a certain amount of mortality is expected in any restoration project. Monitoring and maintenance
are integral to a successful project.
L After seed has been applied to a restoration site, a follow-up monitoring visit should be
conducted to ensure that the seed has been effective at stabilizing the site. Reseeding should be
completed at this point, if required.
ii. While balled and burlapped or container -grown stock can be planted throughout the planting
season, weather conditions must be monitored to ensure adequate rainfall once the planting is
complete. Watering should be planned for any dry periods until plants become established.
Plants are most susceptible in the first growing season but remain sensitive for the first 2-3 years
after planting.
iii. The levels of invasive species should also be monitored. If invasive species begin to dominate
the site or limit plant survivorship, invasive species control should be implemented.
iv. A two-year plant warrantee is standard at nurseries but is ineffective without monitoring of the
restoration site. The restoration site should be monitored several times a year during the plant
warrantee period and any dead stock replaced before the two year period expires.
Appendix G: Restoration Guidelines Page G-2
Erosion and Sediment Control Guide for Urban Construction
B. Seed Mix Selection
An important part of almost all restoration work is the selection of an appropriate seed mix to stabilize the
ground, deter the introduction of persistent invasive species and to contribute to the future biodiversity of
the area being restored. Without proper stabilization of a site, adjacent natural areas may be negatively
affected through sedimentation as well as through the invasion of aggressive exotic species. Proper
stabilization immediately following construction will also limit erosion and promote slope stability.
Factors to consider in seed selection:
i. Seed mixes generally must be comprised of native species. Persistent non-native invasive
species are not acceptable (see table below).
ii. Species should be compatible and complementary to the existing vegetation communities in the
surrounding area. In urban areas or areas where invasive species are pervasive, the seed mix
composition should include species that are able to establish quickly and outcompete unwanted
vegetation.
iii. The seed mix must contain species that are suitable to the local soil type, moisture, and light
conditions.
iv. An annual nurse crop that germinates easily and will not persist on the site should be selected to
ensure quick soil stabilization.
The following species are aggressive exotic species and seed mixes containing these species should not
be selected. Please note that this list does not represent all problem g species and species not listed here
may also be deemed unacceptable. Contact the local CA for a list of species native to the area.
Scientific Name Common Name
Scientific Name Common Name
Agrostis gigantea
red top
Poe pratensis ssp.
ratensis
Kentucky blue
grass
Bromus inermis ssp.
inermis
smooth brome grass
Setaria faberi
giant foxtail
Carex s icata
spiked or European
meadow sedge
Setaria glauca S.pumila)
yellow foxtail
Dact lis glornerata
orchard grass
Setaria italica
(oxtail millet
Elymus repens
(Agropyron repens;
Elytngia re ensquack
grass
Setaria verticillata var.
verticillata
bristly (oxtail
Festuca rubra
(creeping) red fescue
Setaria viridis
green foxtail
Glyceria maxima
giant or rough manna
grass
Trifolium arvense
rabbit -foot clover
Juncus com ressus
round -fruited or
compressed rush
Trifolium aureum (T.
a rarium)
hop -clover
Linum perenne
perennial flax
Trifolium cam estre
large hop -clover
Linum usitatissimum
common flax
Trifolium h bridum
alsike clover
Lotus corniculatus
bird's foot trefoil
Trifolium incarnatum
crimson clover
Melilotus alba
white sweet clover
Trifolium medium
zig-zag clover
Melilotus officinalis
yellow sweet clover
Vicia cracca
cow, tufted, or
bird vetch
Phalaris arundinacea
reed canary grass
Appendix G: Restoration Guidelines Page G-3
APPENDIX H: REFERENCES LIST
APPENDIX H: REFERENCES LIST
Anderson, P.G., B.R. Taylor, and G.C. Balch. 1996. Quantifying the effects of sediment release on fish
and their habitats. Rept. #2346. Department of Fisheries and Oceans, Habitat Management Division,
Vancouver.
California Regional Water Quality Control Board. 1999. Erosion and Sediment Control Field Manual (31
ed). San Francisco Bay Region, CA.
Canadian Council of Ministers of the Environment (CCME). 1999. Canadian Environmental Quality
Guidelines (CWQG), Canadian Council of Ministers of the Environment, Winnipeg.
Canadian Standards Association (CSA). 2018. Construction of Bioretention Systems (CAN/CSA-W201-
18). CSA Group.
Canadian Standards Association (CSA). 2018. Erosion and Sediment Control Inspection and Monitoring
Standard (CAN/CSA-W202-18). CSA Group.
City of Calgary Water Resources. 2017. Erosion and Sediment Control Guidelines. Calgary, AB.
City of Toronto. 2016. Tree Protection Policy and Specifications for Construction near Trees. Toronto,
ON. < https://www.toronto.ca/data/parks/pdf/trees/tree-protection-specs.pdf>
City of Toronto. 2016. Toronto Municipal Code Chapter 681: Sewers. Toronto, Ontario.
Credit Valley Conservation (CVC). 2012. Low Impact Development Construction Guide. Mississauga, ON
Credit Valley Conservation, Ministry of Natural Resources and Forestry, Ministry of the Environment and
Climate Change, Department of Fisheries and Oceans. 2012. Silt Smart: Erosion and Sediment Control
Effectiveness Monitoring and Rapid Response Protocol for High Risk Construction Projects
<http://ontariostreams.on.ca/PDF/Silt%20Smart%20vl-2%20March%205%202012. pdf>
Environment Canada. 2014. Environmental Effects Assessment of Freshwater Thermal Discharge.
Ottawa, ON.
Garside, E.T. 1959. Some effects of oxygen in relation to temperature on the development of lake trout
embryos. Can. J. Zool. 37:689-698.
Greenland International Consulting Inc. and the Toronto and Region Conservation Authority. 2001.
Urban Construction Sediment Control Study. Toronto, Ontario.
Greater Golden Horseshoe Area Conservation Authorities. 2006. Erosion and Sediment Control Guideline
for Urban Construction. Toronto, Ontario.
McNeil, W.J. 1966. Effect of the spawning bed environment on reproduction of pink and chum salmon.
Fish. Bull. 65:495-523.
Ministry of Natural Resources and Forestry. 2017. Niagara Escarpment Plan. Government of Ontario's
Niagara Escarpment Commission.
Ministry of Municipal Affairs. 2017. Oak Ridges Moraine Conservation Plan. Government of Ontario.
Ministry of Municipal Affairs. 2017. Greenbelt Plan. Government of Ontario.
Ministry of Municipal Affairs. 2017. Growth Plan for the Greater Golden Horseshoe. Government of
Ontario.
National Research Council Canada. 1989. Hydrology of Floods in Canada: A Guide to Planning and
Design. Ottawa, ON.
Newcombe, 1986. Suspended sediments in aquatic ecosystems: a guide to impact assessment. British
Columbia Ministry of Environment and Parks, Waste Management Branch, Victoria.
Newcombe, C.P. and D.D. MacDonald. 1991. Effects of suspended sediments on aquatic
ecosystems, North American Journal of Fish Management, 11:72-82.
Nuttall, P.M. 1972. The effects of sand deposition upon the macro -invertebrate fauna of the River Camel,
Cornwall. Freshwater Biol. 2: 81-186.
Ontario Ministry of the Environment (OMOE). 1994. Stormwater Management Planning and
Design Manual 2003, Ontario Ministry of the Environment, Toronto, Ontario.
Ontario Ministry of Transportation. 2015. Environmental Guide for Erosion and Sediment Control During
Construction of Highway Projects. St. Catharines, ON.
Robertson, M.J, Scruton, D.A, Gregory, R.S, and KID Clarke. 2006. Effect of suspended sediment on
freshwater fish and fish habitat. Can Tech. Rep. Fish. Aquat. Sci. 2644: v + 37pp.
Shumway, D.L., and C.E. Warren. 1964. Influence of oxygen concentration and water movement on the
growth of steelhead trout and coho salmon embryos. Technical Paper No. 1741. Oregon Public Health
Service, Corvallis, OR. Agricultural Experimental Station, Oregon State University, and U.S.
Sigler, J.W., T.C. Bjornn, and F.H. Everest. 1984. Effects of chronic turbidity on density and growth of
steelheads and coho salmon. Trans. Am. Fish. Soc. 113:142-150.
Silver, S.J., C.E. Warren, and P. Doudoroff. 1963. Dissolved oxygen requirements of developing
steelhead trout and chinook salmon embryos at different water velocities. Trans. Am. Fish. Soc. 92:327-
343.
Singleton, H.J. 1985. Water quality criteria for particulate matter: Technical appendix. British Columbia
Ministry of the Environment Lands and Parks, Victoria, BC.
South Carolina Dept. of Health and Environmental Control. 2005. Storm Water Management BMP
Handbook "Pipe slope drains". < http://www.scdhec.gov/sites/default/files/docs/Environmenttdocs/runoff-
SlopeDrains.pdf>
Stormwater Assessment Monitoring and Performance (SWAMP) Program. 2005 Synthesis of
Monitoring Studies Conducted Under the SWAMP Program. Toronto and Region Conservation
Authority. Toronto, Ontario.
Terrados, J., Duarte, C.M., Fortes, M.D., Borum, J., Agawin, N.S.R., Bach, S., Thampanya, U., Kamp -
Nielsen, L., Kenworth, W.J., Geertz-Hansen, O., and J. Vermaat. 1998. Changes in community structure
and biomass seagrass communities along gradients of siltation in SE Asia. Estuarine, Coastal and Shelf
Science 46: 757-768.
Toronto and Region Conservation Authority (TRCA) and University of Guelph. 2006. Evaluation of
Design Criteria for Construction Sediment Control Ponds – Markham, Ontario. Toronto, Ontario.
Toronto and Region Conservation Authority (TRCA). 2006. Interim Watershed Characterization Report -
TRCA Watersheds. Toronto, Ontario.
Toronto and Region Conservation Authority (TRCA). 2013. Anionic Polyacrylamide Application Guide for
Urban Construction in Ontario. Toronto, ON.
Toronto and Region Conservation Authority (TRCA). 2014. The Living City Policies for Planning and
Development in the Watersheds of the Toronto and Region Conservation Authority. Toronto, ON.
Toronto and Region Conservation Authority. 2010. Horizontal Directional Drill Guidelines. Toronto, ON. <
https://trca.ca/app/uploads/2016/02/H DD_guidel ines_October_2010, pdf>
Wall,G.J., D.R. Coote, E.A. Pringle and I.J. Shelton (editors). 2002. RUSLEFAC — Revised Universal Soil
Loss Equation for Application in Canada: A Handbook for Estimating Soil Loss from Water Erosion in
Canada. Research Branch, Agriculture and Agri -Food Canada. Ottawa. Contribution No.
AAFC/AAC2244E. 117 pp.
Waters, T.F. 1995. Sediment in Streams, biological effects and control. American Fisheries Society.
RES.#A33120 - PEEL CLIMATE CHANGE PARTNERSHIP TERMS OF REFERENCE
UPDATE
Update on Toronto and Region Conservation Authority's continued
participation in the Peel Climate Change Partnership and Board of
Directors endorsement of the associated Terms of Reference Update.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
THAT Toronto and Region Conservation Authority's (TRCA) continued participation, as a
member of the Peel Climate Change Partnership, be endorsed;
THAT the Peel Climate Change Partnership Terms of Reference attached as Appendix I to
the report, titled "Peel Climate Change Partnership Terms of Reference Update", be
endorsed;
AND FURTHER THAT that a copy of this resolution be forwarded to the Partnership
Member Organizations being the City of Mississauga, City of Brampton, Town of Caledon,
Credit Valley Conservation, and the Region of Peel.
CARRIED
BACKGROUND
Since 2009, the Member Organizations of the Peel Climate Change Partnership (PCCP) have
included the City of Mississauga, City of Brampton, Town of Caledon, Credit Valley
Conservation, Toronto and Region Conservation Authority (TRCA) and the Region of Peel.
Building upon the Region of Peel's Service Strategy Business Plan to address climate change
adaptation and mitigation, the Region of Peel, together with the partners above, worked
together to develop the Peel Climate Change Partnership ("the Partnership") in 2011. The
Partnership built on ongoing and previous plans, policies and actions being undertaken by the
six partners, intended to allow the scaling of practices within the region. Through the
collaborative efforts of the Partnership, many of the priority actions outlined in the Region of
Peel's Service Strategy Business Plan were implemented, including the development of a
climate trends and futures report, cross sector community climate change vulnerability
assessments, and a community greenhouse gas emissions inventory.
In 2017, the Partnership determined that a renewal of its original commitment was required in
order to achieve greater collective impact over the next five years. The purpose of the
Partnership is to identify those areas in which strategic collaboration will be most advantageous.
At Authority Meeting #4/18, held on May 25, 2018, Resolution #A72/18 was approved in part as
follows:
THAT the Region of Peel Community Climate Change Partnership Plan be approved, in
principle;
THAT staff be directed to continue to work with partners to achieve the desired
outcomes established in the Plan;
The Partnership recently completed an update of its Terms of Reference to refresh its
mandate and purpose, confirm ongoing value to members, review scope of priority work,
and increase accountability. The Partnership Terms of Reference review occurred over several
months in 2019, as a collective undertaking, and guided by a Working Group of executive
leaders across the Partnership. The updated Peel Climate Change Partnership Terms of
Reference (Attachment 1) and current Governance Structure (Attachment 2) were unanimously
approved in principle by the Partnership's Steering Committee in December 2019.
RATIONALE
In order to focus member efforts, the Partnership has developed three strategies that partners
align their work with: the Low Carbon Communities Strategy; the Green/Natural Infrastructure
Strategy; and, the Flood Resiliency Strategy. TRCA has played, and continues to play, a key
role in the development and implementation of these three strategies. By aligning work with
Partnership strategies, TRCA ensures that staff efforts and resources support the needs and
priorities of the Region of Peel and partner municipalities, while also maximizing the impacts of
this work by coordinating with Partnership members. TRCA staff are working to enact the three
current PCCP strategies through a variety of mechanisms and roles.
Low Carbon Communities Strategy — TRCA is co -lead of the Low Carbon
Communities Strategy, with the Town of Caledon. As part of this Strategy, TRCA is
project managing the development of a Regional Zero Emission Vehicles (ZEV) Strategy
to accelerate the adoption of ZEVs in Peel Region. This work includes policy review and
alignment mapping (complete), research and data analysis (currently underway) and
hosting an action prioritization workshop and focus groups, as well as report synthesis
and supporting implementation (to be completed). The ZEV Strategy is complemented
by a recent joint grant application that was made by Partnership members to the Natural
Resources Canada Zero Emission Vehicle Infrastructure Program for partial funding to
install electric vehicle charging stations across Peel Region over the next 18 months. By
working through the Partnership, minimum requirements for grant eligibility were
exceeded.
Green/Natural Infrastructure Strategy - The goal of the Green/Natural Infrastructure
Strategy is to increase tree canopy to mitigate extreme heat and provide multiple co -
benefits in high priority neighbourhoods in Peel Region. This strategy is co -led by TRCA,
with the Region of Peel. Planting of street trees and stewardship efforts are targeting
communities within Mississauga (Derry Rd E/Airport Rd), Brampton (Mavis/Hwy 407)
and Caledon (Mayfield Rd/Hwy 50). As part of this Strategy, TRCA has worked to create
a heat vulnerability index to identify, and support the selection of, these heat vulnerable
areas in Peel. TRCA and partner staff are now in the process of forming implementation
teams that can undertake community consultation and tree planting. This work is also
complemented by the development of urban forest best practice manuals, being
developed in collaboration with relevant partners, including the Region of Peel, local
municipalities and both Conservation Authorities
Flood Resiliency Strategy — The Flood Resiliency Strategy aims to strengthen the
integrated approach to water management for collective action in reducing flood risk in
priority areas and is led by Credit Valley Conservation. TRCA's work in flood outreach
and flood emergency management, in partnership with the municipalities of Caledon,
Brampton, and Mississauga, supports the objectives of this Strategy. As co -lead of the
Emergency Preparedness component of the Flood Resiliency Strategy, TRCA staff
conducted outreach efforts, including public open houses, in partnership with
municipalities, for priority Flood Vulnerable Areas in Peel Region during Q1 2020. TRCA
will be sharing lessons learned from this work with Partnership members and will also be
initiating working groups to address technical, communications and training gaps
identified by Partnership members related to emergency preparedness.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 1 — Green the Toronto region's economy
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 7 — Build partnerships and new business models
Strategy 8 — Gather and share the best sustainability knowledge
FINANCIAL DETAILS
TRCA leverages the special levy climate change funding provided by the Region to further
activities that are in-line with Partnership objectives. In addition, TRCA pursues external funding
through grant or other programs, where applicable and appropriate.
DETAILS OF WORK TO BE DONE
The Partnership strategies and associated work described above extend until 2022.
Report prepared by: Rehana Rajabali, extension 5220, and Victoria Kramkowski,
extension 5707
Emails: rehana.raiabali(a)trca.ca, victoria.kramkowski(a)-trca.ca
For Information contact: Rehana Rajabali, extension 5220, and Victoria Kramkowski,
extension 5707
Emails: rehana.raiabali(a�trca.ca; victoria.kramkowski(a).trca.ca
Date: March 13, 2020
Attachments: 2
Attachment 1: Peel Climate Change Partnership Terms of Reference
Attachment 2: Peel Climate Change Governance Structure
Attachment 7 — Peel Climate Change Partnership Terms of Reference
Peel Climate Change Partnership
Terms of Reference — Updated December 2019
2018-2022
1-9-2020
HAMPTON �// Credit Valley MRegion Toronto and Region
\yl( �P%r Conservation III of Peel =''' Conservation
im aam flower Gty ` a v mississdUGd g y Authority
pl Town of cAreoory inspired b nature WOr�Clfl with you
Peel Climate Change Partnership Terms of Reference
2018-2022
Table of Contents
1 Context..................................................................................................................................................1
2 Mandate................................................................................................................................................2
3 Scope.....................................................................................................................................................2
Toronto and Region
Conservation
4 Purpose.................................................................................................................................................2
TOWN OFCALEDON Loe
5 Membership..........................................................................................................................................2
Mlsslssauca
5.1 Value for Each Member................................................................................................................3
.�1�
Authority
6 Governance...........................................................................................................................................4
6.1 Structure.......................................................................................................................................4
6.1.1 Steering Committee..............................................................................................................4
6.1.2 Secretariat.............................................................................................................................4
6.1.3 Strategy Champions..............................................................................................................4
6.1.4 Strategy Leads.......................................................................................................................
5
6.1.5 Technical Support Teams......................................................................................................5
6.2 Decision Making Process...............................................................................................................5
6.3 Quorum.........................................................................................................................................5
6.4 Delegated Authority......................................................................................................................6
6.4.1 Funding/Grant Applications..................................................................................................6
6.5 Meeting Schedule.........................................................................................................................6
6.6 Compensation/Remuneration......................................................................................................6
7 Accountabilities.....................................................................................................................................6
8 Roles and Responsibilities.....................................................................................................................7
8.1 Principles of Engagement.............................................................................................................
7
8.2 Steering Committee......................................................................................................................7
8.2.1 Champion, Represent and Influence.....................................................................................7
8.2.2 Strategically Plan and Drive Change.....................................................................................7
8.2.3 Find Resources......................................................................................................................7
8.2.4 Communicate........................................................................................................................8
8.2.5 Special Events........................................................................................................................8
8.3 Chairperson...................................................................................................................................8
8.3.1 Steering Committee Meetings..............................................................................................8
8.3.2 Communications...................................................................................................................8
1� G BRAMPTON
Credit Valley
Conservation
Region
g
Il j' of peed
Toronto and Region
Conservation
kiumpbuo flower 01y
TOWN OFCALEDON Loe
inspired by nature
Mlsslssauca
working with you
.�1�
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
8.3.3 Facilitation.............................................................................................................................8
8.4 Implementation Team: Strategy Champions, Strategy Leads and Technical Support ..................9
8.4.1 Strategy Champions: Make Recommendations, Engage Other Leaders, Provide Oversight
andExpertise.........................................................................................................................................9
8.4.2 Strategy Leads/Co-Leads: Direct Technical Work.................................................................9
8.4.3 Technical Support Teams: Undertake Technical Work.......................................................10
8.4.4 All Implementation Team Members: Communicate and Champion..................................10
8.4.5 All Implementation Team Members: Special Events..........................................................10
8.5 Secretariat...................................................................................................................................10
8.5.1 Secretariat Director.............................................................................................................10
8.5.2 Secretariat Staff..................................................................................................................11
9 Communications.................................................................................................................................12
9.1 Internal ........................................................................................................................................12
9.1.1 Platform..............................................................................................................................12
9.1.2 Meeting Minutes.................................................................................................................12
9.1.3 Communication Briefs.........................................................................................................12
9.1.4 Reports to Council and Boards............................................................................................12
9.2 External.......................................................................................................................................12
9.2.1 Platform..............................................................................................................................13
9.2.2 Branding and Logos.............................................................................................................13
9.2.3 Templates............................................................................................................................13
9.2.4 Communication Briefs.........................................................................................................13
9.2.5 Media..................................................................................................................................13
9.2.6 Advocacy.............................................................................................................................13
9.2.7 Special Events......................................................................................................................13
10 Risks................................................................................................................................................14
10.1 Shared Risks................................................................................................................................14
10.2 Individual Risks............................................................................................................................14
11 Review Process................................................................................................................................14
Region fE. Toronto and Region
HAMPTON Loe
Credit Valley g (fir1� G conservation r of peed Conservation
Authority
kmmpbiao ower 1 TOWN OFCALEDON inspired by nature MISSISsaUGa working with you
Peel Climate Change Partnership Terms of Reference
2018-2022
1 Context
The Peel Climate Change Partnership (PCCP or Partnership) is designed to build and accelerate
innovative climate solutions in the geographic region of Peel. By leveraging resources and expertise from
the six (6) member organizations, the Region of Peel, Town of Caledon, City of Brampton, City of
Mississauga, Toronto and Region Conservation Authority and Credit Valley Conservation, the
Partnership embraces the opportunity to align with, and accelerate the outcomes of Member
Organizations' climate change plans and initiatives; as well as pursue strategic actions that transcend
political boundaries and collectively produce greater results.
In June of 2011, the Partnership produced a key document, the Peel Climate Change Strategy, a
Strategic Plan for Climate Change for the geographic region of Peel. The strategy recognized the urgent
need to respond to climate change at the local level and the importance of the leadership of all our
Member Organizations to ensure that the Strategic Plan becomes reality. Over the past eight (8) years,
significant outputs of the Strategic Plan's collective implementation include an inventory of greenhouse
gas (GHG) emissions for the geographic region of Peel as well as analysis of vulnerability of various
systems to climate change to guide priority actions.
In more recent years, the PCCP has developed three (3) key strategies/priorities to focus our shared
efforts given the limited resources supporting the Partnership activities. They are: GHG emissions
reduction through low carbon communities; increasing flood resiliency; and, increasing green
infrastructure. Each strategy has a corresponding and Partnership -approved work plan. During this time,
Member Organizations have also made significant progress on accelerating climate action by finalizing
their own climate change plans' and recently declaring climate change emergencies locally and at the
regional level'.
While each Member Organization may have projects that also address these three (3) areas of activity,
the specific actions under each of the three (3) are being pursued as shared priorities across the region.
Increasing climate change knowledge and awareness of the public is an ongoing area of interest and will
be an important consideration when the Partnership reviews its communication objectives and priorities
in early 2020.
The PCCP has been guided throughout its tenure by a Steering Committee comprised of decision makers
for each Member Organization and Technical Implementation Teams that develop and undertake the
various strategies and actions. It has been several years since the Terms of Reference for the Steering
Committee was developed and the PCCP recognized it was important to renew the document and
further articulate the roles and responsibilities of the members in the context of the Partnership as a
whole.
' City of Brampton: Community Energy and Emissions Reduction Plan
Town of Caledon: Community Climate Change Action Plan
City of Mississauga: Climate Change Action Plan
Region of Peel: Climate Change Master Plan
' Climate change emergencies have been declared by the City of Mississauga, City of Brampton and Region of Peel
Region Toronto and Region
HAMPTON �e/,
Credit 9
liyG Sr conservation � Peed �i Conservation
Authority
hmmpbuo oWBf 11y TOWN OFCALEDON inspired by nature MISSISSdUGd warkingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
2 Mandate
Governed by pre-existing mandates of each Member Organization, the mandate of the Peel Climate
Change Partnership is to courageously lead, communicate and work collaboratively with key
stakeholders to drive local climate action and secure investment that enables the rapid and equitable
transformation of municipalities and broader community, within the Region of Peel, to become low
carbon and resilient.
3 Scope
The PCCP has developed the following three (3) key strategies/priorities to focus shared activities:
1. Reducing community GHG emissions;
2. Increasing flood resiliency; and
3. Increasing green infrastructure'.
4 Purpose
In the current term of the Peel Climate Change Partnership (2018 —2022), the purpose of the PCCP is to
amplify influence on policy reform and develop/implement best practice to:
1. accelerate the reduction of community GHG emissions within the portfolios of buildings and
vehicles to support the GHG reduction targets of Member Organizations' climate change plans;
2. be better prepared for extreme weather and changing climate, specifically as it relates to
increased flood risk and intense heat; and
3. measure, report and communicate progress towards achieving GHG reduction targets and
increasing resiliency.
5 Membership
Member organizations of the Peel Climate Change Partnership are:
➢ City of Brampton;
➢ City of Mississauga;
➢ Town of Caledon;
➢ Region of Peel;
➢ Credit Valley Conservation; and
➢ Toronto and Region Conservation Authority
The Partnership will regularly assess the organizational composition to determine if broader
representation from other sectors such as business, utility, not -for profit, broader public sector, etc. would
be beneficial.
' Green Infrastructure, as employed by the PCCP, is defined in the PCCP's Green and Natural Infrastructure
Strategy.
iryG BRAMPTO N
Sr
CreditValleyg
conservation
Region
Ilr peel
Toronto and Region
4' Conservation
liumpbuo I)WElf 11y
�e/,
TOWN OFCALEDON
inspired by nature
rllsslssauca
of
workingwRhyau
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
5.1 Value for Each Member
Region of Peel: Influence and Alignment - The PCCP offers the opportunities for elected or executive
leadership participation in the celebration of milestones that inspires greater commitment and
accelerates the shared climate change agenda; and that the PCCP pursues activities that cannot
effectively be undertaken by any single member and are in clear alignment with achieving priorities of
the Region's Climate Change Master Plan.
City of Brampton: Share Knowledge and Accelerate Climate Change Actions —The Partnership can
support the development of municipal strategies, programs and plans through sharing knowledge and
best practices in climate change adaptation and mitigation. The Partnership will also support local action
through identifying opportunities and establishing partnerships to accelerate municipal climate change
adaptation and mitigation actions that align with regional strategies.
Credit Valley Conservation: Increased Technical Capacity —A strategic venue to further protect
watershed resources from flooding impacts; accelerate the transition from carbon -based fuel and
reduce GHGs in order to slow the impacts of climate change on watershed resources; and further
protect watershed resources and watershed residents from heat impacts associated with climate
change.
City of Mississauga: Support and Accelerate Local Climate Change Priorities — To support the
implementation of actions within Mississauga's Climate Change Action Plan that have regional
opportunities: collective efforts that support research, strategies and shared services that cross
boundaries (e.g. ZEV Strategy); create opportunities for bulk green procurement purchases (e.g. fleet,
equipment); strengthen funding opportunities by taking regional approach and partnership model
(multi -municipal and conservation authorities as applicants); and, for building a climate community of
practice to share knowledge and influence.
Town of Caledon: Enhanced Capacity - This strategic Partnership allows the Town to enhance its ability
to reduce community greenhouse gas emissions and adapt to changing climate patterns. Specifically,
this Partnership allows for the development of consistent approaches that can be adopted across
member organizations to decarbonize the transportation and buildings sector, fostering strategic
decisions that increase impact Regionwide. In addition, the Partnership allows the Town to leverage the
technical skills to inform climate change adaptation efforts, such as the development of stormwater and
flood management programs.
TRCA - Regional coordination to support and accelerate climate action - Partnership offers a mechanism
to support municipal partners with evidence -based science, policy development, and implementation
mechanisms to accelerate collective impact on climate action. Facilitate connections on climate action
work between Peel Region, CVC and other municipalities in the TRCA Region.
Region
HAMPTON ,
Credit F g
�� LI&
Conservation Ilf of Peel
iiumpbuo fIOWE;f�l1y TOWNOFCALEDON inspired by nature MISSIssaUGa working with you
� Tonrdo and Region
its Conservation
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
6 Governance
6.1 Structure
The PCCP shall be comprised of a Steering Committee, a Secretariat and an Implementation Team:
Strategy Champions, Strategy Leads and Technical Support Teams. See Appendix 1. Updates to staff
representation within the Partnership structure will be made, as needed.
6.1.1 Steering Committee
Includes one (1) Chairperson (see section 6.1.1.1) and one (1) or two (2) executive leadership
representatives from each PCCP Member Organization as primary Steering Committee members.
Alternates for primary Steering Committee members are the Strategy Champions (see below).
It is expected that PCCP Steering Committee members are decision makers within their respective
Member Organizations.
Each PCCP Member Organization may replace and/or substitute PCCP Steering Committee members at
any time.
6.1.1.1 PCCP Chairperson
The Chairperson for the PCCP shall be one (1) of the primary Steering Committee members and will
count as one (1) of the two (2) Steering Committee members from that Member Organization.
The Chairperson of the PCCP Steering Committee will rotate between the Member Organizations and
each Chairperson will serve for one (1) year, starting each October, based on the following schedule:
Organization
Year
Town of Caledon
2019
Region of Peel
2020
City of Mississauga
2021
City of Brampton
2022
Credit Valley Conservation
2023
Toronto and Region Conservation Authority
2024
6.1.2 Secretariat
Includes one (1) Director and select staff from the Office of Climate Change and Energy Management at
the Region of Peel.
6.1.3 Strategy Champions
One (1) senior staff person from each of the PCCP Member Organizations; alternates to Steering
Committee members.
Region
HAMPTON , Credit F g
�� LI&
Conservation Ilf of Peel
iiumpbuo f�OWE;i�I�J TOWNOFCALEDON inspired by nature MISSISSaUGa working with you
Toronta..d Region
Conservation
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
6.1.4 Strategy Leads
One (1) staff from a PCCP Member Organization for each strategy in any given PCCP term.
6.1.5 Technical Support Teams
Staff from various organizations, mainly, but not necessarily limited to, PCCP Member Organizations.
6.2 Decision Making Process
Decisions of the PCCP Steering Committee will be based on consensus of Member Organizations, with
each Member Organization having one (1) vote. The aim will be to have general agreement from all
Steering Committee members or alternates, and Secretariat Director and Strategy Champions, if present
at Steering Committee meetings, on matters and direction of the Partnership. If there is no general level
of agreement, a vote will be called to reflect the majority based on the following continuum:
a) Fully support the matter;
b) The matter is acceptable;
c) More information or discussion is still warranted;
d) Can neither support or accept the matter.
After this voting process, if there is no majority, the final decision will be determined by the PCCP
Steering Committee or alternates only and reflect the majority based on the above exercise.
Specifically, (a) fully support the matter, (b) the matter is acceptable, will be considered votes to
proceed, and (c) more information or discussion is still warranted, and (d) can neither support nor
accept the matter, will be considered votes to not proceed with the matter.
6.3 Quorum
Quorum for PCCP Steering Committee shall be based on a majority of Member Organizations (50%
representation from Member Organizations plus one). For greater clarity, quorum will be achieved
when at least four (4) Steering Committee members or alternates from different Member Organizations
are in attendance.
PCCP Steering Committee members are expected to attend all regularly scheduled meetings or send an
alternate on their behalf. In the event that a Committee member or alternate is unable to attend a
meeting, the member must contact and advise the PCCP Secretariat. If a Committee member or their
alternate has been absent for three (3) consecutive regularly scheduled meetings and has failed to
advise the PCCP Secretariat in advance, the member shall be deemed to have abandoned his or her
membership on the PCCP Steering Committee and the membership shall be considered vacant.
If a member of the PCCP Steering Committee abandons their membership, the Committee may continue
to operate with a minimum of four (4) Member Organizations. If membership is reduced to less than
four (4) Member Organizations, all PCCP meetings shall be cancelled until the minimum membership
criteria can be met.
Credit VaRegionion
�yuBAMPTON �, conservation F oPool
iimpblflower Gy ,eTOWNOFCALEDON�` ng
with you
Toronta..d Region
Conservation
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
6.4 Delegated Authority
There is no delegated authority to the PCCP. Some PCCP recommendations may require approval from
the corresponding Council/Board before the recommendation is implemented and/or funded.
Accordingly, consensus decisions of the PCCP Steering Committee will not dictate the work of any
one (1) member or Member Organization, but rather the preferred approach to taking climate action.
Member Organizations will support the decided priority action(s) as they are able to and see fit.
6.4.1 Funding/Grant Applications
Funding/grant opportunities, which support the mandate and purpose of the PCCP and are decided
priorities of the Steering Committee, can be pursued by any single or multiple Member Organization(s)
acting on behalf of the Partnership while adhering to the principles of transparency and accountability.
Processing of any single or joint funding/grant application on behalf of the Partnership would leverage
and adhere to the existing and proper processes within participating Member Organization(s).
6.5 Meeting Schedule
Steering Committee Meetings: The PCCP Steering Committee will meet quarterly. Additional meetings
may be called as required. PCCP Strategy Champions are invited to attend Steering Committee meetings.
Implementation Team Meetings: The PCCP Strategy Champions AND Strategy Leads/Co-Leads will meet
bi-monthly. Participation of Strategy Leads/Co-Leads or delegate is required. Participation by one or all
Strategy Champions will be subject to agenda.
Additional meetings of the PCCP Strategy Champions Group OR Strategy Leads/Co-Leads may be called
as required.
The PCCP Technical Support Teams will join the bi-monthly Implementation Team meetings or meet as
required.
Meeting locations will rotate amongst the Member Organizations
6.6 Compensation/Remuneration
All members of the PCCP will serve without remuneration and will not be reimbursed for any expenses
by the PCCP. Remuneration and business expense reimbursements, if any, will be handled by the
Member Organizations in accordance with each organization's policies and procedures.
Periodically, consultants and vendors may be used to supplement implementation teams. Financing
decisions will be made independently through Steering Committee meeting agenda items and on a
project basis. This will be subject to approval by the Steering Committee.
7 Accountabilities
The updated Terms of Reference for the PCCP will be brought to Member Organizations' Councils or
Boards, as appropriate, seeking resolution to endorse the Terms of Reference, direct staff participation,
Region fi. Toronto and Region
HAMPTON ,�/
Credit � g r
1� G ��r, conservation Ilf Peed Conservation
Authority
iiumpbuo �W81liy TOWN OFCALEDON inspiredbynature MISSISSdUGd warkingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
meet the stated mandate, achieve the defined purpose during the timelines associated with each PCCP
term, and report back on progress at the end of each Partnership term.
Upon receiving endorsement by appropriate Councils and Boards, the PCCP Steering Committee
members hold the accountability for meeting the PCCP mandate, achieving the purpose during the term
timelines and reporting progress to appropriate Councils and Boards.
8 Roles and Responsibilities
8.1 Principles of Engagement
Partners are expected to represent the Partnership in a positive and supportive manner at public events.
Furthermore, Partners are expected to promote the mandate and purpose of the Partnership when
speaking at public events.
8.2 Steering Committee
The Steering Committee is a governance body that oversees the work of the Partnership. The Steering
Committee will ensure that the Member Organizations are on board/supportive with/of the work and
will allocate resources to it as appropriate. The responsibilities of the Steering Committee are to:
8.2.1 Champion, Represent and Influence
1. Proactively target and effectively influence policy makers and staff within the Partnership
Member Organizations to secure the required investments and commitments
2. Represent the Partnership internally with each organization and externally in panels or other
events
3. Broadly share knowledge and educate others on the Partnership and its activities
4. Assume the responsibilities of the Chair, when required
2.2 Strategically Plan and Drive Change
1. Establish common understanding of our shared purpose
2. Engage in long-term strategic planning to establish the Partnership's future priorities
3. Provide strategic direction and guidance to the Secretariat and Implementation Teams
established to undertake defined activities
4. Receive recommendations and decide clear joint priorities and outcomes
5. Receive recommendations and decide shared targets and performance metrics
6. Receive and approve proposals for new activities/initiatives, including consideration for
alignment, timelines, budget, resources
8.2.3 Find Resources
1. Ensure there is internal capacity within each organization to support the Steering Committee
2. Ensure effective organization of work and allocation of resources from the Partners to achieve
the desired outcomes
3. Pursue, highlight and help influence the securing of funding opportunities to support shared
actions and to facilitate the implementation of the actions at the local level
Region Toronto and Region
HAMPTON �,
Credit g
1� G �r conservation r � peed �i Conservation
Authority
iiumpbuo (fWf:i liy TOWN OFCALEDON inspired by nature MISSISSdUGa workingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
4. Receive and provide direction on recommendations from Champions or Strategy Leads to
pursue joint funding/grant applications
8.2.4 Communicate
1. Approve and use timely, strategic and consistent climate change messaging
2. Communicate with respective staff, Boards of Directors or Councils regarding the priorities and
achievements of the Partnership
3. Approve and deliver reports, briefs and memos to Boards and Council on results achieved
4. Endorse communications material for distribution
8.2.5 Special Events
1. Attend special events, including the stakeholder forum, workshops, professional sessions and
participate on panels, where appropriate
2. Secure acceptance of invitations from peers to events
3. Help recruit speakers to events
8.3 Chairperson
The Chairperson is a member of the Steering Committee and presides over the Partnership to ensure
the planning of Partnership activities is effective and aligns with its mandate and purpose. In addition to
the responsibilities as a Steering Committee member, the responsibilities of the Chairperson are to:
8.3.1 Steering Committee Meetings
1. Meet with PCCP Secretariat Director to develop and confirm Steering Committee meeting dates
and agendas, as needed
2. Preside over Steering Committee meetings by calling them to order, adjourning them,
announcing items on the agenda as they come up and recognizing when members have the
floor
3. Determine if quorum is present
4. Oversee the decision-making process, including calling votes to establish consensus
5. Ensure that meetings are planned effectively
6. Ensure that matters are dealt with in an orderly, respectful and efficient manner
7. Convene and cancel Steering Committee meetings, as required
8. Delegate Chairperson responsibility to other Steering Committee members, as needed
8.3.2 Communications
1. Represent the Partnership and serve as the media spokesperson during his/her term
2. Delegate the role of media spokesperson to other Steering Committee members as necessary
8.3.3 Facilitation
1. Guide Partnership members to make decisions through consensus building
2. Encourage input and collaboration between members
3. Seek commitments from Steering Committee members to support the mandate and purpose of
the Partnership
1� G BRAMPTON
Jr
�r
Credit
conservation
Region
g
r Of peed
� Toronto and Region
�i Conservation
iiumpbuo oWBf 11y
TOWN OFCALEDON
inspired by nature
Mlsslssauca
workingwRhyau
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
8.4 Implementation Team: Strategy Champions, Strategy Leads and Technical Support
The Steering Committee is supported by individuals in each of their respective organizations who are
themselves senior leaders and/or subject matter experts and/or technical staff with responsibilities to
undertake the planning and execution of the priority strategies and actions on behalf of the Partnership.
With support from the Secretariat, the Implementation Team will identify the resources and decision
points needed and engage with key stakeholders from within the Member Organizations, to ensure
effective implementation. The responsibilities of the Implementation Team are to:
8.4.1 Strategy Champions: Make Recommendations, Engage Other Leaders, Provide Oversight
and Expertise
1. Make recommendations to the Steering Committee on new priorities and appropriate strategies
and actions to undertake on behalf of the PCCP, including pursuing joint grant/funding
applications or introducing new in -year initiatives
2. Monitor and update the Steering Committee on high-level progress in relation to priorities and
outcomes
3. Make recommendations to the Steering Committee on when to move from planning to
coordinated collective implementation of priorities
4. Participate in Steering Committee meetings (as regular attendees with decision making
authority and/or alternates)
5. Participate, as appropriate, in bi-monthly Implementation Team meetings to receive progress
updates, and provide feedback on idea generation and strategic approaches to implementation
6. Lead the engagement with key internal stakeholders from respective Member Organizations,
such as Directors, Managers or other program leaders that are impacted by Partnership
initiatives to support strategy implementation and help draw appropriate resources for
achieving Partnership mandate and purpose
7. Maintain technical or expert knowledge
S. Endorse communications material for distribution, as needed
8.4.2 Strategy Leads/Co-Leads: Direct Technical Work
1. Lead and/or carry out the technical tasks in support of the strategy(ies) being pursued by
ongoing engagement with key individuals/decision—makers across Member Organizations
2. Identify resources needed to carry out the tasks and seek through PCCP or individual
organizational budgets or other grants
3. For approved projects requiring funding:
a. Obtain resource/funding commitments, in writing, from participating Member
Organizations;
b. Undertake all procurement, tracking, financial reconciliation, invoice payments in
accordance with his/her Member Organizations policies and procedures; and
c. Ensure that there shall be no award of contracts/external expenditures until all funding
committed by participating Member Organizations is actually received.
Region � Toronto and Region
HAMPTON �,e/,
Credit g
1� G �r conservation r peed Conservation
Authority
iiumpbuo oWBf I� TOWN OFCALEDON inspired by nature MISSISSdUGd warkingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
4. Report on progress in completing tasks in support of the strategy(ies) at monthly Strategy Leads
meetings
5. Provide data to inform the metrics and indicators of the Partnership's strategies and priorities as
identified in approved workplans
6. Provide updates and make recommendations on the Partnership's strategies to the Strategy
Champions
7. Provide updates to the Steering Committee, upon request
8. Draft reports, briefs and memos for Steering Committee approval
9. Act as alternate to Strategy Champion, as required
8.4.3 Technical Support Teams: Undertake Technical Work
1. Undertake technical work as assigned by Strategy Leads/Co-Leads
2. Assist with the drafting of reports, briefs and memos
8.4.4 All Implementation Team Members: Communicate and Champion
1. Seek opportunitiesto communicate with internal and external audiences/stakeholders about
the work of the PCCP
2. Provide results in communication briefs, using clear language that allows others to understand
and convey messages
3. Identify gaps/issues and provide options for resolutions
4. Communicate Steering Committee comments, direction, decisions to the technical support
teams, as appropriate.
8.4.5 All Implementation Team Members: Special Events
1. Attend the special events, including the Stakeholder Forum
2. Provide support to the Secretariat with the planning and delivery of events
8.5 Secretariat
The Secretariat is situated within the Region of Peel's Office of Climate Change and Energy
Management. The Secretariat's role is to facilitate and support the strategic and operational work of the
Partnership and ensure effective administration of group activities.
8.5.1 Secretariat Director
The responsibilities of the Secretariat Director are to:
8.5.1.1 Strategic Operations
1. Lead the development or update of PCCP Terms of Reference and other operating documents as
required
2. Support all members understanding of the role and function of the Partnership as a whole and
individual members
3. Support the selection and onboarding of all members and the Partnership's Chair
Region � Toronto and Region
HAMPTON �,
1� G
�r
Credit
conservation
g
r � peed
4F Conservation
iiumpbuo 11Wei I�
TOWN OFCALEDON
inspired by nature
Mlsslssauca
workingwRhyau
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
8.5.1.2 Steering Committee Support
1. Liaise with Partnership Chair and support quarterly Steering Committee meeting agenda setting
and meeting minute approval
2. Liaise with members of the Steering Committee to provide support, as needed
3. Attend and participate in quarterly Steering Committee meetings
4. Organize, coordinate and facilitate long-term strategic planning discussions with the Steering
Committee
5. Lead the development of a Terms of Reference Implementation Guide for Steering Committee
members
8.5.1.3 Implementation Teams Support
1. Chair the bi-monthly Champions/Strategy/Co Leads meetings
2. Liaise with Strategy Champions and assist with preparation for quarterly Steering Committee
meetings, as needed
8.5.2 Secretariat Staff
The responsibilities of the Secretariat staff are to:
8.5.2.1 Administration
1. Establish meeting dates and locations and coordinate meeting logistics
2. Prepare and distribute meeting agendas and packages in a timely manner
3. Record and share meeting minutes; seek approval of quarterly Steering Committee meeting
minutes from Partnership Chair
4. Upload documents on the shared file storage system
5. Create templates for communications material to ensure that information is communicated to
the Steering Committee consistently and in the appropriate amount of detail
8.5.2.2 Communications
1. Provide support with media relations, inquiries and marketing
2. In coordination with appropriate members, develop and/or share updates about strategies and
priorities of the Partnership with all members
3. Review Partnership documents to ensure that language is consistent with agreed-upon
terminology and branding
4. In coordination with appropriate members, create communication briefs and other strategic
documents for broad dissemination to external stakeholders
5. Lead summary reporting of special events, including the Stakeholder Forum
6. Lead the drafting of the Partnership's achievement reports to member organizations' Councils
or Boards at the end of each Partnership term
8.5.2.3 Special Events
1. Support the Partnership in developing goals and objectives for special events
2. Support the Partnership with the creation of special event budget(s) and manage budget(s), as
appropriate
3. Choose and secure a venue and date, as appropriate
4. Identify collaboration opportunities with other organizations or industry partners
5. Research speakers and panelists, as appropriate
Region Toronto and Region
HAMPTON �,e/,
Credit g
1� G �r conservation r peed OWConservation
Authority
iiumpbuo oWEli 11y TOWN OFCALEDON inspired by nature MISSISSdUGd warkingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
6. Develop and deploy a marketing campaign, as appropriate
7. Create agenda and schedule
8. Provide funding resources to cover venue (if needed), essential materials and light refreshments
9 Communications
9.1 Internal
Internal communications refer to communications that occur between individual members of the
Partnership (i.e., Steering Committee members, Strategy Champions, Strategy/Co-Leads, Secretariat
members)
9.1.1 Platform
Partnership documents for internal use will be managed via a secure platform for Member
Organizations.
9.1.2 Meeting Minutes
Minutes from the quarterly PCCP Steering Committee meetings will be taken, approved and distributed
in a timely manner to all Partnership members.
In order to ensure the timely communication of decisions and directions to the Implementation Team,
PCCP Steering Committee members have two (2) weeks following the distribution of the minutes to
note any corrections before decisions are communicated to the Implementation Team.
Formal meeting minutes of other Partnership -related groups or matters will be at the discretion of the
participants. At a minimum, actions will be recorded, and action register(s) will be created and
maintained.
9.1.3 Communication Briefs
Communication briefs will be used to explain Partnership activities (existing and proposed), process
information and provide strategic analysis and context of meeting outcomes.
9.1.4 Reports to Council and Boards
The Partnership will update member organizations' Councils or Boards at the beginning of the Council
Term on progress and future strategic priorities. Efforts should be taken by Member Organizations to
coordinate the scheduling of communications to ensure consistency in messaging and enhance
alignment.
The preferred approach for updating Councils or Boards is for the Region of Peel to update Regional
Council first, followed by the conservation authorities updating their Boards and finally local
municipalities updating their local Councils.
9.2 External
External communications refer to communications that occur between the Partnership Member
Organizations and
external non-member parties.
1 yG HAMPTON
CreditValleyg
Sr conservation
Region Toronto and Region
Ilr peel Si Conservation
iiumpbuo IIWElf I�
�,
TOWN OFCALEDON inspired by nature
Mlsslssauca
of
Authority
workingwRhyau
Peel Climate Change Partnership Terms of Reference
2018-2022
9.2.1 Platform
There is no current Partnership -specific platform to support external or general public access to
Partnership information. The Partnership will periodically assess if a digital communication platform or
equivalent would be beneficial.
9.2.2 Branding and Logos
When a document is supportive of Partnership objectives, all logos of Member Organizations shall be
represented with the following statement:
"This work is in support of the Peel Climate Change Partnership's Mandate and Purpose."
9.2.3 Templates
Templates will be developed to ensure that the Partnership's external communications are consistent
and audience appropriate.
9.2.4 Communication Briefs
Communication briefs that are audience appropriate will be used to share or explain Partnership
achievements, activities and priorities (existing and future).
9.2.5 Media
Media refers to any print, broadcast (radio or television) or online source (website or social media site)
that provides news and information to the general public or specific audiences.
9.2.6 Advocacy
The Partnership will develop unified advocacy communications for consideration by each Member
Organization; any use or sending of such communications would be at the discretion of and via existing
processes and protocols of each Member Organization.
9.2.6.1 Time -Sensitive Advocacy and Communications
At the discretion of the Chair, meetings will be convened, with representation from all Member
Organizations, for the purpose of crafting time -sensitive, strategic and unified advocacy and
communications content.
9.2.7 Special Events
The Partnership will host special events, subject to Steering Committee approval, to facilitate strategic
and targeted engagement with the broader community in order to strengthen influence, share
knowledge, showcase milestone achievements or profile an issue or opportunity to further the
Partnership mandate and purpose. Included in the roster of special events is the Stakeholder Forum,
which may be hosted one or more times per Partnership term as relevant initiatives and opportunities
for deeper collaboration evolve, and resources allow. Invitation to special events, including the
Stakeholder Forum, will be broad and present a key opportunity for elected leadership to participate.
Region
HAMPTON
Credit F g
�� JrLI&
Conservation Ilf of Peel
kiumpbuo fIOWE;I�I�J TOWNOFCALEDON inspired by nature MISSISsaUGa working with you
� Tonrdo and Region
its Conservation
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
10 Risks
While acknowledging the various benefits and potential to accelerate shared goals and impacts through
the Partnership, participation also exposes Member Organizations to risks. Potential risks associated
with participation in the Partnership are categorized as Shared Risks and Individual Risks.
10.1 Shared Risks
1. Implementation challenges: The Partnership is not achieving its desired outcomes and level of
influence required to enable the changes needed to address the urgency of climate change.
2. Lack of support from Senior Leadership/Council: The Partnership does not command the
support of senior leaders in each Member Organization of members of Council.
3. Future uncertainty: The future state of climate science, local, provincial and federal political
climate, and the economy is unknown, unpredictable and uncontrollable and can therefore
lower confidence in decision making.
10.2 Individual Risks
1. Conflicts of interest: Where a decision or action is right for the interests of the Partnership but
does not align with the interests or priorities of Member Organizations.
2. Drain on resources: Commitment of time and energy of staff in addition to any additional
financial or other resource contributions.
3. Negative reputation impact: If the Partnership does not meet its mandate, it could cause
damage to the reputation of Member Organizations by association and their credibility as
climate change leaders.
11 Review Process
Review of the PCCP is the process through which the Member Organizations seek to re -approve its
collaborative commitment.
The review process shall be conducted prior to the end of the Member Organization's term (yearly) and
in alignment with the start of a new Term of Council (every four (4) years).
The review process shall include both retrospective and prospective context in that it provides an
opportunity for all Member Organizations to reflect upon the administration, function and progress of
the Partnership and to also consider future priorities. While the emphasis is on the strategic direction of
the Partnership, in reaching a consensus of re -approval, the review process will consider the
management of the collaboration that anchors the efforts of the Partnership.
The review process is discrete from the annual monitoring and progress reporting procedures. It
considers the operation of the Partnership at a higher level than that of the implementation team
strategy development.
The review shall consider the following:
1. Whether the basis for the collaboration remains valid;
1 yG HAMPTON
liumpbuo �WBf I�
�/
�Sr,
TOWN OFCALEDON
Creditvalleyg
conservation
inspired by nature rllsslssauca
Region
Ilr peel
workingwRhyau
fi. Toronto and Region
r
Conservation
Authority
Peel Climate Change Partnership Terms of Reference
2018-2022
2. Potential impacts of upper level government decision-making that revises, cancels or introduces
relevant policies and priorities;
3. The future of the Partnership in the light of Partners' strategic priorities;
4. Whether the collaboration remains appropriate in the context of the Partners' commitments;
5. Whether it continues to command the support of senior leaders in each Member Organization;
6. Whether it is achieving the desired outcomes and level of influence; and,
7. Whether the Member Organizations continue to recognize the value of the PCCP.
Region fi. Tororrto and Region
HAMPTON Credit Valley � g (fir
1� G ger, conservation Ilf of peed Conservation
Authority
kiumpbuo (IWf:i 11y TOWN OFCALEDON inspired by nature MISSISSdUGd working wRhyou
Attachment 2: Peel Climate Change Governance Structure
I �
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2018-2022 Peel Climate Change Partnership — Governance Structure
Chair* Secretariat
.4------------------------------------------------------------------------------ Director
Andrew Farr(2020)
Christine Tu
Region of Peel
Region of Peel
(ROP)
Kathryn Lockyer
Andrew Farr
City of
Brampton (COB)
Michael Won
of Mississa
(COM)
Paul Mitcham
Town of Caledon
(TOC)
Fuwing Wong
Credit Valley
Conservation
(CVC)
Deborah
Martin -Downs
o
Region of Peel
City of Brampton City of Mississauga
Town of Caledon
(TOC )
Credit Valley
d ii
(ROP)
(COM)
(COB)
Katelyn McFadyen (On
Conservation
A
v)
Christine Tu
Jodi RobillosH
Michael eralall
Leave eff. Feb. 2020)
(CVC)
V
Dianne Zimmerman
Allie Service
Gayle Soo Chan
in w
ma
J
Low Carbon Communities
Katelyn McFadyen, TOC
Nathaniel Magder, TRCA
Technical Support Team
ZEV Strategy Steering Committee
Leya Barry, COM
Chun Liang, COB
Katelyn McFadyen, TOC
Adam Vaiya, ROP
Daniel Call, Alectra (advisory role)
TBD, Hydro One (advisory role)
Bryan Purcell, TAF (advisory role)
Project Management Team
Nathaniel Magder, TRCA
Gil Amdurski, TRCA
(Consultants—TBD in 2020)
Priority Strategies
Flood Resiliency
Christine Zimmer, CVC
Technical Support Team
Staff from All Member Organizations
Green (Natural)
Infrastructure
Heather Hewitt, ROP
Noah Gaetz, TRCA
Technical Support Team
Meaghan Eastwood, TRCA
Yvette Roy, CVC
(Consultants)
Staff from Municipal Urban Forestry
Working Group
Toronto & Region
Conservation
Authority (TRCA)
John Mackenzie
Toronto & Region
Conservation
Authority (TRCA)
Victoria Kramkowski
Rehana Rajabali
New
Strategic Initiatives
Technical Support Team
Secretariat
Coordinator Specialist Manager
Joan Engineer Iris Wagner JeremySchembri
Region of Peel Region of Peel Region of Peel
Special Events
Stakeholder Forum
Knowledge Sharing/Webinars
Leadership Panels
Project Milestones/Recognition
Media Releases
`PCCP Chairperson is an annual position I Updated January 7, 2020
RES.#A34/20 - FEDERATION OF CANADIAN MUNICIPALITIES' VISIONARY AWARD
APPLICATION
Acknowledgement and endorsement for application to have SNAP
Program considered for the Federation of Canadian Municipalities' (FCM)
Visionary Award.
Moved by: Joanne Dies
Seconded by: Linda Jackson
WHEREAS Toronto and Region Conservation Authority (TRCA) has delivered the
Sustainable Neighbourhood Action Program in partnership with nine local and regional
municipalities since 2009;
AND WHEREAS the Federation of Canadian Municipalities has released a call for
applications to the Green Municipal Fund 20'" Anniversary Visionary Award, which
requires Board of Directors acknowledgement and endorsement of the application;
THEREFORE, LET IT BE RESOLVED THAT TRCA Board of Directors acknowledge and
endorse an application for the Sustainable Neighbourhood Action Program to be
considered for Federation of Canadian Municipalities' Green Municipal Fund 20"
Anniversary Visionary Award;
AND FURTHER THAT staff be directed to report back to the Board of Directors before
year end on the next phase of the SNAP Program and proposed opportunities to expand
the program to inform municipal budgeting discussions.
CARRIED
BACKGROUND AND RATIONALE
As part of its 2020 Sustainable Communities Awards, the Federation of Canadian Municipalities
(FCM) has created a Green Municipal Fund (GMF) 201" Anniversary Visionary Award. This
award will be granted to an initiative that demonstrates how sustainability and innovation can
generate long-term community change. Eligible initiatives must have been started or completed
within the last 20 years and must demonstrate measurable environmental, social and economic
benefits. Additionally, applicants must provide Board or Directors or Council acknowledgement
and endorsement of the application.
Toronto and Region Conservation Authority's (TRCA) Sustainable Neighbourhood Action
Program (SNAP) was launched in 2009 and is an excellent candidate to be recognized
nationally by this award. TRCA developed SNAP in close collaboration with nine municipalities
who would also be identified in the proposed award application. Staff from those municipalities
are aware and supportive of the nomination. The nine municipalities include:
• City of Toronto;
• Region of Peel, City of Brampton, City of Mississauga and Town of Caledon; and
• Region of York, City of Richmond Hill, City of Markham and City of Vaughan.
SNAP is a neighbourhood model for sustainable urban renewal and climate action and was
developed to help municipalities overcome the challenges of retrofitting and renewing older
neighbourhoods. The success of SNAP is rooted in a collaborative approach that aligns
municipal priorities with local needs and interests that improves efficiencies, draws strong
community support and builds trusted implementation partnerships for initiatives in public and
private realms. Working with local stakeholders, SNAPs address a broad range of sustainability
objectives by advancing strategies for:
• Home retrofits (e.g. tree planting, local flood protection, rainwater harvesting);
• Infrastructure renewal (e.g. integration of environmental and social outcomes into parks,
stormwater management facilities, roads);
• Multi -unit residential, commercial and institutional revitalization (e.g.sustainable
landscaping, urban agriculture, building retrofits); and
• Community resilience and leadership capacity (e.g. neighbour connections, skills
building, emergency preparedness).
Since the initial development of the neighbourhood action planning model in 2009, TRCA has
worked closely with its municipal partners and a diverse range of stakeholders on pilot SNAP
action plans, implementation projects, strategies for scaling the model's successes and laying
the foundation for the longer term program. In 2016 TRCA's Board endorsed the transition from
pilot projects to a SNAP Program. Significant accomplishments have garnered recognition
locally, nationally and internationally. This short video provides an overview of the Program and
perspectives from diverse partners - httas://trca.ca/conservation/sustainable-neighbourhoods/
SNAP Program highlights include:
• Toronto Foundation's 2012 Vital Ideas Award;
• C40 Cities Award Finalist and named to Cities100's top 100 list of innovative climate
action projects worldwide in 2016;
• Canadian Society of Landscape Architects' 2016 National Award for Bayview Glen
SNAP;
• Growing network of SNAP neighbourhood projects — 8 SNAPs in TRCA's jurisdiction, 5
more SNAP's in Ontario, and starting in 2019 the Netherlands government supports 17
Dutch municipalities in adopting TRCA's SNAP model;
• SNAP neighbourhood model is being recognized with increasing collaboration with
municipal programs — e.g. City of Brampton established Nurturing Neighbourhoods
Program and City of Toronto is aligning neighbourhood resilience pilots with SNAP;
• FCM awarded TRCA and nine interested municipalities a Transition 2050 grant under
the Municipal Climate Innovation Program to support knowledge transfer of the
neighbourhood model as an effective strategy for low carbon mobilization.
TRCA SNAP neighbourhood project highlights include:
• Home retrofit programs have achieved deeper engagement and measurable action (e.g.
17% of Black Creek SNAP neighbourhood homes have implemented 1,229 significant
environmental and resiliency retrofits, including on average 2 stormwater management
retrofit actions and 1.2 trees planted per home).
• Planned infrastructure projects have incorporated resident -inspired design
enhancements to achieve greater environmental function and community amenities.
Eight significant green infrastructure projects have been completed on public land,
including boulevard bioswales, quality control stormwater management ponds, wetlands
and raingardens, complemented with 1000's of trees and pollinator plants, trails,
meditation gardens, art installations, educational signage, seating, etc.
• Partnerships with private landowners and community groups have resulted in 32 green
infrastructure and urban agriculture installations and other sustainability initiatives on 14
multi -unit residential properties and 18 commercial or institutional properties, with far-
reaching benefits. In the San Romanoway towers in the Jane and Finch neighbourhood,
for example, 70% of residents reported feeling more safe, >85% reported a positive
impact on their mood, 61 % confirmed they have been inspired to start a small business
due to the project and 69% reported the project inspired them to fundraise for a
community cause, as a result of SNAP's actions.
• SNAP projects have strengthened community resilience by fostering community
connections and skills training, resulting in the resident -led formation of three formalized
neighbourhood groups and a social enterprise.
• SNAP has built community capacity to sustain environmental work — at the San
Romanoway tower revitalization project, every 1 hour of SNAP programming generated
19 hours of community volunteerism, totaling 35,000 hours of volunteerism over the past
four years.
• Since 2009, over 11,400 people have been engaged toward sustainability actions across
all SNAPs and 9,300 trees and shrubs have been planted, many on private land.
• Additionally, 264 skills training workshops have been delivered since 2009, representing
over 1,000 learner hours of community learning.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
In addition, the SNAP Program contributes to many of the other TRCA's corporate strategies.
FINANCIAL DETAILS
There is no fee associated with the FCM Visionary Award application, however there is a
requirement for a representative of the winning entry to deliver a presentation at FCM's 2020
Sustainable Communities Conference taking place October 20-22, 2020 in St. John's,
Newfoundland where award winners will be honoured. If the project is selected, funds to cover
travel expenses may be available in SNAP Program budgets and if not, other budgets will be
reviewed to ensure a TRCA representative is available to be present.
There is no cash remuneration for the winning entry, although the winning entry is automatically
eligible for FCM's Inspire Award (voted upon by conference delegates) and this award comes
with professional coaching and support to prepare a professional "Ted Talk" style presentation
on the project.
The SNAP Program's core funding is derived from municipal capital support from the regions of
Peel and York, and the City of Toronto. TRCA is also in discussion with Durham Region
municipalities in our jurisdiction and will report back to the Board on this. By leveraging these
municipal budgets, SNAP has attracted additional public and private funding of over $3 million
dollars over the past 10 years, including grants from FCM, EcoAction, RBC Bluewater, CMHC
and others, that have helped advance the innovative practices and approaches of SNAP at the
neighbourhood level. Additionally, both municipal and non -municipal funding has helped
contribute to the establishment of cost sharing arrangements with other partners, supported the
development of community capacity and empowered volunteers to extend neighbourhood -scale
efforts toward achieving TRCA's watershed objectives and strategic goals shared with our
municipal partners, such as community resiliency, ecosystem restoration and healthy
communities.
DETAILS OF WORK TO BE DONE
FCM requires a Board of Directors resolution acknowledging and endorsing the submission of
the application for the Green Municipal Fund 20th Anniversary Visionary Award. Following Board
acknowledgement and endorsement, staff will submit the necessary documentation and
application to FCM by the April 30, 2020 deadline.
Report prepared by: Sonya Meek, extension 5253
Emails: sonya.meek(a)trca.ca
For Information contact: Sonya Meek, extension 5253
Emails: sonya.meek(a)trca.ca
Date: April 8, 2020
RES.#A35/20 - LAKE ONTARIO RESILIENCE
This report outlines the factors that influence Lake Ontario water levels,
reviews impacts and procedures developed through previous high water
level events, summarizes the current activities and forecast for 2020, and
provides an update on the ongoing mitigation and long-term resilience
work across the Lake Ontario shoreline within the Toronto and Region
Conservation Authority jurisdiction including efforts with partners to
secure funding to advance resiliency initiatives in Toronto, Pickering and
Ajax.
Moved by: Jack Heath
Seconded by: Ronald Chopowick
THAT staff be directed to continue to work with and assist the City of Toronto and
Durham municipal partners with the implementation of the flood resilience alternatives
identified in the Toronto Islands Flood Characterization, Risk Assessment Project and
local waterfront projects, as well as the construction of proactive works to mitigate
impacts from the high water levels anticipated for 2020;
THAT staff be directed to continue working with the City of Toronto and Durham Region/
Ajax and Pickering on the planning and implementation of flood and erosion mitigation
projects along the Lake Ontario waterfront related to the 2017 and 2019 high lake events
and 2018 windstorm event, as supported by Infrastructure Canada through the Disaster
Mitigation and Adaptation Fund and any available municipal funds;
THAT staff be directed to continue to plan and implement flood and erosion mitigation
projects as part of the Toronto and Region Conservation Authority's Toronto Waterfront
Erosion Hazard Mitigation Project, as supported by the Disaster Mitigation and
Adaptation Fund;
THAT staff be directed to continue to liaise with the Great Lakes Adaptive Management
Committee, the International Lake Ontario -St. Lawrence River Board, and the
International Joint Commission to share high water level flood and erosion impacts
across all of TRCA's jurisdiction in order to inform regulation decisions and the
assessment of regulation plans; and
THAT staff be directed to continue participation in the Lake Ontario Resiliency Working
Group as identified in the Toronto City Council Report MM12.6 Promoting effective 21s`
Century Flood Mitigation and Resilience.
AND FURTHER THAT staff be directed to continue to send correspondence to senior
levels of government to advise them of TRCA and municipal shovel worthy flood
mitigation and resilience projects on the Lake Ontario shoreline that would benefit from
senior government investments.
CARRIED
BACKGROUND
At Board of Directors Meeting #6/19, held on June 21, 2019, Resolution #A108/19 was
approved as follows:
THAT the Toronto Islands Flood Characterization and Risk Assessment Project report
(May 2019) prepared by W.F. Baird & Associates Coastal Engineers Ltd. be received;
and
THAT staff be directed to work with the City of Toronto to secure funding, regulatory
approvals, and assist the City with the implementation of the flood mitigation alternatives
identified in the Toronto Islands Flood Characterization and Risk Assessment Project
including advancing a Class EA to facilitate implementation of flood protection works.
In the spring of 2017, water levels in Lake Ontario reached levels higher than had been
measured since record keeping began in 1918. The effect of this flooding was significant on the
Toronto Islands where over 800 residents, almost 30 businesses, and two schools were forced
to adapt to rising waters and service disruptions. In addition to Toronto Islands, much of the
Lake Ontario shoreline parks also experienced significant shoreline erosion, damage and debris
accumulation over the spring and summer of 2017.
In response to the 2017 flood conditions the Toronto and Region Conservation Authority
(TRCA) assisted municipal partners with flood forecasting, warning, and mapping products.
TRCA also assisted the City of Toronto with the operational response, deploying thousands of
sandbags, meter bags, and pumps.
In 2018, TRCA worked with the City of Toronto to repair damaged areas and install naturalized
berms and sumps to protect strategic areas from potential future funding. On Toronto Islands,
sand from sandbags was left in place, forming berms that were planted with native grasses. The
installation of nine sumps was completed to collect surface flooding and drain low lying and
saturated areas with a series of weeper tiles. The City also made significant alterations to the
ferry docks, allowing for safe passenger embarkation/debarkation for a wider range of lake
levels.
In 2019, water levels on Lake Ontario set new records. The operational frameworks and
mitigation measures that were conceived in 2017 and installed in 2018 allowed for an effective
response; parts of Toronto Islands remained open to the public in 2019, despite the persistence
of even higher water levels.
In 2018, TRCA in collaboration with the City of Toronto, successfully secured $150,000 in grant
funding from the federal National Disaster Mitigation Program (NDMP), with the City of Toronto
matching $150,000 for a total of $300,000 for the Toronto Islands Flood Characterization and
Risk Assessment Project. The resulting study was received by the Board of Directors at Meeting
#6/19, held on June 21, 2019, through the passing of Resolution #A108/19 noted above.
Amongst the outputs from this project was a Toronto Islands -specific flood characterization,
which assessed the existing flood level values specified for Lake Ontario: a task whose
extension to all the Great -Lakes has been identified as part of the Provincial Flood Strategy.
Through TRCA's technical plan review function, staff leveraged the best available information in
order to assess risks to new development and infrastructure.
In 2019, the federal government announced $11.9 million in funding for repair and enhancement
projects through the Disaster Mitigation and Adaptation Fund (DMAF), with the City of Toronto
contributing more than $17.9 million. TRCA and City of Toronto Parks, Forestry, and Recreation
are partnering in undertaking this work, with approximately $20 million flagged for TRCA project
delivery. To date, three projects have been completed as part of this work at Bluffers Park,
Colonel Samuel Smith Park and Humber Bay Shores, and another four are expected to be
completed at Bluffers Park, Sunnyside Park, Ashbridges Bay Park and Palace Pier in 2020.
Also in 2019, the federal government announced $33.8 million in funding, with the City of
Toronto contributing $50.7 million, in support of the Toronto Waterfront Erosion Hazard
Mitigation Project which involves the monitoring, prioritization, planning and implementation of
maintenance work along an extensive network of 231 TRCA owned shoreline flood and erosion
control structural assets.
As a Conservation Authority located in Canada's highest populated and most heavily urbanized
city, TRCA has been given a unique opportunity to become leaders in natural infrastructure
design by finding innovative solutions that balance the needs between the built and natural
environment, while considering the implications of climate change. TRCA's flood and erosion
mitigation efforts are designed with this vision in mind, representing solutions that provide robust
physical protection while at the same time enhancing the natural environment. For example,
many of TRCA's current shoreline protection projects are utilizing unique natural infrastructure
designs, including offshore reefs and dynamic cobble beaches, which provide aquatic habitat
improvements and enhance the capacity of the natural environment to better adapt to hazards.
RATIONALE
Lake Ontario water levels depend primarily on three factors:
1) Inflows from Lake Erie, which are unregulated and account for approximately 85% of
inflows into Lake Ontario. Lake Erie water levels are well above record high levels for
this time of year and are projected to continue to be above previous record levels
through the spring;
2) The runoff from watersheds, like those in TRCA's jurisdiction, that drain directly into
Lake Ontario, and;
3) The outflow from Lake Ontario, which is regulated at the Moses -Saunders Dam by the
International Lake Ontario St. Lawrence River Board (ILOSRB) of the International Joint
Commission (IJC). Outflows are influenced by the spring peak flow of the Ottawa River
as the ILOSRB is charged with regulating flows to balance both upstream and
downstream risks.
As outlined by the IJC, the levels observed in 2019 were the result of several separate extreme
weather conditions occurring in the same year:
a) Persistently high flows from Lake Erie into Lake Ontario, eventually exceeding record -
highs by spring 2019
b) Above-average precipitation within the Lake Ontario -St. Lawrence basin from late -fall
through spring, and;
c) A record-setting flood event on the Ottawa River that joins the St. Lawrence River near
Montreal, the second in three years
Analysis by the IJC concluded that the ILOSRB "managed outflows during the unusual and
extreme weather conditions from November 2018 through late -May 2019 according to Plan
2014 rules that were based on Board operations under the previous regulation plan, Plan 1958-
D. During this entire period, water supplies coming into Lake Ontario were consistently high,
reaching record-breaking levels in May, and neither regulation plan would have been able to
take significantly more water off Lake Ontario quickly enough to make a meaningful difference in
water levels and prevent the flooding in 2019.
Throughout the high-level events of 2017 and 2019, TRCA staff pro -actively shared impact
reports with the ILOSRB and the Great Lakes Adaptive Management (GLAM) Committee.
These reports were shared via GIS impact tracking maps, in-person meetings, and most
recently, a summary document of impacts and critical thresholds (Attachment 2). On March 3,
2020, the IJC announced that the GLAM committee would undertake an expedited review of
Plan 2014. TRCA staff continue to engage with ILOSRB and GLAM staff to highlight impacts
and risks to the shorelines within TRCA's jurisdiction, in order to help inform both outflow
decisions and regulation plan updates. This is in-line with the intent in the Ontario Flood
Strategy facilitate dialogues with water management partners, including the IJC, to provide
opportunities to evaluate current policies.
As with riverine flood forecasting and warning activities, TRCA issues public flood messages
based on local interpretation of forecasts. Lake Ontario water level forecasts are issued by the
ILOSRB, while wave forecasts are produced by both Environment Canada and the Ontario
Ministry of Natural Resources and Forestry. For reference TRCA issues Shoreline Hazard
Watches and Warnings based on the following criteria:
a. Shoreline hazard watch at combined water level of 75.1 m AND forecast
offshore waves of >2.Om (related to public safety and erosion risks)
b. Shoreline hazard watch for static water level between 75.5m — 75.7m
c. Shoreline hazard warning for static water level of >75.7m
The most recent water level forecast issued by the ILOSRB is provided in Attachment 1
Since 2017, in addition to the short-term and long-term mitigation measures outlined below,
TRCA staff have been supporting all municipal partners with mapping, technical information,
local forecast updates, and impact tracking throughout the shoreline within our jurisdiction.
While flood response activities will continue to assist in the short-term, the simultaneous
advancement of long-term mitigation measures is paramount.
Long-term mitigation measures take into consideration general climate change implications and
site-specific conditions including the infrastructure at risk, the primary hazard (flood and/or
erosion), existing protection (if any), the physical shoreline characteristics and the coastal
environment (wave action, nearshore substrate, etc.). Mitigation solutions are being designed to
be resilient, with a projected lifespan of 50 years. In order to achieve this, structures are being
built to higher elevations, rock "splash -pads" are being built in -land of the structure to prevent
erosion from overtopping, heavier armourstone material is being used and multiple layers of
armourstone are being implemented. This approach aligns with the Principles of Effective Flood
Management outlined in Ontario's Flooding Strategy, which highlights the need to'build back
better'— implementing post -disaster recovery that reduces vulnerability to future disasters and
builds community resilience.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
Flood forecasting and warning related services are funded from account code 115-60.
Planning and implementation of flood and erosion mitigation projects are funded by the
City of Toronto, Infrastructure Canada and TRCA Capital funding and are tracked under
241-01 (Toronto Island), 186-01 (projects recoverable from City of Toronto), 241-01
(TRCA Capital funds).
DETAILS OF WORK TO BE DONE
TRCA has activated its Incident Management System (IMS) structure for high water levels on
Lake Ontario, and is providing regular updates to all partner municipalities who have shoreline
within our jurisdiction; this activity will continue until water levels begin receding and cross below
the Shoreline Hazard Watch threshold for static water level.
TRCA is in the process of planning and implementing numerous flood and erosion control
mitigation projects across our jurisdiction. Projects that have been completed, are currently in
construction. or will have construction initiated within 2020. are outlined below:
• Ashbridges Bay Park Major Maintenance Project
• Bluffer's Park South Headland and Beach Major Maintenance Project
• Bluffer's Park Marina — West Shore Project
• Eastern Beaches Natural Beach Barrier Restoration and Beach Curb Repair Project
• Long Branch Park Major Maintenance Project
• Palace Pier Court Headland Maintenance Project
• Sunnyside Park Revetment Maintenance Project
• Toronto Island accelerated flood mitigation works:
o Construction of 125m of beach curbs at Wards Island ferry dock
o Raising of approximately 300m of road along Lakeshore Avenue and 200m of
road along Cibola Avenue
o Flood mitigation along the north shore of Algonquin Island
• Toronto Island Class Environmental Assessment to determine the long-term solutions for
areas of this Island not covered by the accelerated works
TRCA also continues to work with its municipal partners of the City of Pickering and Town of
Ajax on a number of shoreline resiliency initiatives. In 2019, TRCA leveraged funding from
Ontario Power Generation (OPG) to repair and extend the beach dune protection fencing at the
Frenchman's Bay West Spit in the City of Pickering, which has contributed significantly to the
resilience of the area during high water events. TRCA has also provided the City of Pickering
with a proposal for a shoreline erosion monitoring and harbour entrance channel assessment, to
establish an existing conditions baseline from which to monitor future shoreline changes as a
result of severe weather; and to inform maintenance dredging requirements to maintain safe
navigation for marine vessels, respectively. TRCA is also interested in working with the City of
Pickering on the West Spit of Frenchman's Bay to address failed infrastructure and to ensure
that new infrastructure is protected against high lake levels and wave uprush from high wind
events, pending confirmation of additional approximately $450,000 in funding.
In the Town of Ajax, TRCA installed post and paddle fencing along a section of the Waterfront
Trail in 2018 to keep park users from the edge of severely eroded bluffs following the 2017 high
water event; and completed stormwater management control and local hydrology improvements
at the Paradise Park wetland in 2019. Ajax is currently revisiting a trail design for a section of
the Waterfront Trail that was undermined as a result of the high lake levels, with TRCA assisting
with the permitting and design phases of the project. TRCA is also assisting the Town of Ajax
with the review of the existing bridge at Duffins Creek and proposed infrastructure associated
with the Lake Ontario Waterfront trail.
TRCA are coordinating these projects with our municipal partners and are engaging
stakeholders and the public directly through formal Environmental Assessment consultation,
where necessary, standard email, project specific websites and on-site signage. Lastly, the well-
being of our employees and members of the public continues to be the top priority for TRCA, all
work is being undertaken following all precautions outlined in TRCA's Pandemic Incident
Management System (IMS) Procedures for Field Work.
Report prepared by: Rehana Rajabali, extension 5220; Jet Taylor, extension 5526
Emails: rehana.raiabaliCciltrca.ca; jet.taylorCciltrca.ca
For Information contact: Rehana Rajabali, extension 5220, Jet Taylor, extension 5526
Emails: rehana.raiabaliCcDtrca.ca; let.taylorCcDtrca.ca
Date: April 1, 2020
Attachments: 2
Attachment 1: Lake Ontario Water Level Forecast from International Lake Ontario -St. Lawrence
River Board
Attachment 2: Summary of high water level impacts shared with Great Lakes Adaptive
Management Committee, International Lake Ontario -St. Lawrence River Board, and
International Joint Commission
Attachment 1— Lake Ontario Water Level Forecast Summary
Water Level Forecast Summary for Lake Ontario as of April 23
The International Lake Ontario -St. Lawrence River Board (ILOSRB) provides the forecasts for Lake
Ontario. The most recent forecast notes that water levels on Lake Ontario will continue to remain well
above-average through the spring, with upstream Lake Erie above record levels, However, declining
Ottawa River flows, increased outflows and seasonable weather forecast for the near-term all
continue to reduce the peak water level outlook for this spring, and Lake Ontario is now on track
to peak well below the record -highs of 2017 and 2019.
There is potential for more active weather and some heavier precipitation this coming week, as well as
somewhat milder temperatures than this past week. The Ottawa River is expected to continue to decline
over at least the next several days. Outflows are expected to remain high as they continue to be
maximized to the extent possible. These factors combined will likely result in a moderate rise on Lake
Ontario this coming week, but no significant or rapid increases in water levels are expected at this time,
and Lake Ontario remains on track to peak well below the record highs of 2017 and 2019. Weather
conditions, including temperatures, remaining snowmelt and rainfall will determine the rate and magnitude
of rising water levels throughout the Lake Ontario — St. Lawrence River system over the next several
weeks.
Lake Ontario's (lake -wide average) level was 75.35 m on Wednesday, April 22, after rising very little over
the past week. This level is 40cm above average, and also:
0 34 cm *below* the record -high for this time of year set in 1973;
0 11 cm *below* the water level on the same date in 2017;
0 13 cm *above* the level on the same date in 2019.
76.4
Lake Ontario Water Level Forecast
for the weeks ending 01 May through 2 October 2020 (issued on 24 Apnl)
This probalis6c forecast is produced primarily from historical(1900-20118{wale, supply scenarios. Results represent water
levelslhal would be exceeded 5%, 50% & 95% of thetime i1 eimiler wet, average & dry conditions (respadively) were m occur.
250.0
75.0
_ -
249.0
75.7
-
_ _
248.0
75.4
-
E
Historical Maximums
247.0
75.1
------- - R"l-------
d2020
-.� :
246.a
b
m
3
2019 : 'Average
74.9
(1919-2019) -
-;
245.0
74.5
. ,,Fay..:.:---____'
__.- � _-
244.0
74.2
-
- - - - flimomal Minimums - -
-__
243.11
738
_ _ __ _
242.0
73.6
g g
g 8
m z
.n'y
V Do
ry ry ry
There is potential for more active weather and some heavier precipitation this coming week, as well as
somewhat milder temperatures than this past week. The Ottawa River is expected to continue to decline
over at least the next several days. Outflows are expected to remain high as they continue to be
maximized to the extent possible. These factors combined will likely result in a moderate rise on Lake
Ontario this coming week, but no significant or rapid increases in water levels are expected at this time,
and Lake Ontario remains on track to peak well below the record highs of 2017 and 2019. Weather
conditions, including temperatures, remaining snowmelt and rainfall will determine the rate and magnitude
of rising water levels throughout the Lake Ontario — St. Lawrence River system over the next several
weeks.
Lake Ontario's (lake -wide average) level was 75.35 m on Wednesday, April 22, after rising very little over
the past week. This level is 40cm above average, and also:
0 34 cm *below* the record -high for this time of year set in 1973;
0 11 cm *below* the water level on the same date in 2017;
0 13 cm *above* the level on the same date in 2019.
Attachment 1— Lake Ontario Water Level Forecast Summary
Lake Ontario levels are likely to reach or fall below the levels at the same time in 2019 during the coming
week. It was at this time last year that an exceptional Ottawa River snowpack started melting rapidly with
mild and wet weather, eventually leading to unprecedented flows in both peak and duration.
Lake Ontario outflows are currently 9,450 m3/s (333, 700 cfs). The International Lake Ontario — St.
Lawrence River Board continues to maximize outflows from Lake Ontario, making frequent adjustments to
maintain Lake St. Louis near the minor flood level of 22.33 m (73.3 ft). This remains above the current F -
limit, which is meant to balance high water conditions upstream on Lake Ontario with those downstream
in the lower St. Lawrence River.
The most recent forecast graphic is available here: https:Hijc.org/en/losirb/watershed/Forecasts
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Summary of Lake Impacts 2019
Toronto and Region Conservation Authority
As the International Joint Commission is charged with regulation of Lake Ontario outflows so as to
balance upstream and downstream risks and industry considerations, and the Great Lakes Adaptive
Management Committee is charged with evaluating regulation plans and decisions, this document is
meant to summarize the tangible and significant impacts that have occurred to shoreline areas within
the Toronto and Region Conservation Authority (TRCA) jurisdiction over the last three years. This
information can support a fulsome understanding and consideration of the lake -based risks to the
Greater Toronto Area and to also support consideration of additional regulation plan deviations that
may help to further reduce the risk to Lake Ontario shorelines.
In both 2017 and 2019, TRCA provided support to our municipal partners, by providing forecast updates,
highlighting potential impact areas, tracking existing impacts, and supporting municipal partners in their
operational response. A real-time GIS tracking tool of impacts within TRCA's jurisdiction was shared with
staff from the International Lake Ontario St. Lawrence River Board (ILOSRB) as well as the Great Lakes
Adaptive Management (GLAM) Committee throughout the 2019 event. On September 6, 2019, staff
from TRCA, the City of Toronto, the City of Pickering and the Town of Ajax met with staff from the
ILOSRB and GLAM Committee to share a timeline and description of impacts. The second section of this
document provides a summary of impacts to areas within TRCA's jurisdiction.
Summary of impacts
In the spring of 2017, water levels in Lake Ontario reached levels higher than had been measured since
record keeping began in 1918, and these levels were once again surpassed in 2019 where TRCA issued a
shoreline Hazard Warning for 115 days throughout the spring/summer. The effect of this flooding was
significant across TRCA's jurisdiction which includes the Toronto Waterfront, Toronto Islands, and
Pickering/Ajax waterfront sections.
The Toronto Islands are home to over 800 residents, almost 30 businesses, and two schools. The 2017
closure of the Islands during peak season due to high water presented a major disruption in tourist and
recreational activity which is an important source of revenue to the City and local businesses. The
flooding resulted in the activation of the City of Toronto Emergency Operations Centre and
approximately $8 million in direct and indirect damages related to the closing of Toronto Island Park. In
response to the 2017 flood conditions, TRCA and the City of Toronto deployed over 45,000 sandbags,
1,000 meter bags, and over a dozen industrial pumps to mitigate the effects of the rising water. In 2018,
interim mitigation measures were installed on the Islands which helped keep portions of the Islands
open despite the worse water level and wave conditions experienced in 2019. The main access road
along the island was submerged for many weeks and deemed impassable, which resulting in the
suspension of public access to the Hanlan's Point sections of the island. In 2019, and additional 22,000
sand bags were procured, and additional 60 meter bags were placed (in addition to re -using those from
2017), 14 aqua dams were installed, and 14 pumps were deployed.
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
The Toronto Waterfront includes many beaches and recreational infrastructure to the east and west of
the downtown core, as well as marina and port -related infrastructure. As much of the Downtown
Toronto waterfront is lake -fill, high lake levels result in poor drainage and sewer back-up onto roads and
underpasses during times of wet weather. In 2019, portions of Lakeshore Blvd were frequently closed as
the storm sewer system could not achieve positive drainage for rainfall. The overtopping of offshore
erosion protection structures due to high -lake levels left many areas along the entire waterfront subject
to erosion during times of high waves, including the Scarborough Bluffs. Submerged boardwalks, festival
ground closures, damaged trails and long -submerged tree root systems are just some of the impacts of
note.
For the City of Toronto alone (waterfront and Islands) the estimated cost of repairs due to the 2017 High
Lake Level Impacts was $16.2 Million, while the 2018 ice/wind storm triggered an additional $12.1
Million in repairs. Full costing for the damage from the 2019 high -lake level is not yet available as
surveying of erosion damage has only recently begun now that water levels have somewhat receded.
Impacts to the waterfront areas in Pickering/Ajax included significant trail erosion and damage to
recreational infrastructure, as well as high water table impacts (seepage to basements) for properties
surrounding Frenchman's Bay, as well as overland flooding of streets in the Paradise Park
neighbourhood of Ajax. Previously buried infrastructure was exposed due to the erosion, and a public
play structure had to be removed as the shoreline crept towards it.
The 2019 event was the worst experienced thus far in terms of still -water level, duration of high level,
and concurrent wind -storms causing significant wave action and lake seiche. Impacts are still being
tallied but it is critical to understand that levels even a few cm higher would have triggered an entire
new set of impacts with drastic consequences as outlined below. While TRCA continues to work with
municipal partners towards the implementation of resilience measures in certain specific areas, it is
important to recognize the significant risk prior to the implementation of such measures, and the
significant and widespread risk that will continue to exist in other shoreline areas. The most recent
ILOSRB forecast through April 2020 displays the potential for high lake levels again in 2020.
TRCA would like to emphasize that static lake levels of 76.Om IGLD and above trigger further potential
impacts, in addition to a repeat of impacts already experienced this year. These [occur at various levels
above 76.Om and] may include, but are not limited to, the following:
• Flooding of portions of Billy Bishop Toronto City Airport facilities, including access roads, as
well as taxiways and runways
• Ferry docking operational concerns; despite the retrofits, even higher lake levels could limit
ferry service
• Flooding of Toronto Hydro non -submersible assets and requirement to de -energize portions
of Toronto Islands, which in -turn would likely trigger secondary impacts such as the
evacuation/public closure of Toronto Islands, and potential impacts to the Toronto Island
Water Treatment Plant, which may not be able to support peak loads for the Enwave Deep
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Lake Water Cooling system's provision of air conditioning to the downtown core during
summer months.
• Impacts to Toronto Islands wastewater treatment pumping stations and potential sewer
servicing suspension
• Significant drainage issues during rainfall events for underpasses and low-lying areas
throughout downtown Toronto
• Insufficient freeboard under Liverpool Road to pass flows from Krosno Creek in Ajax
• Reduced capacity of river mouths, including the Humber and Don River, in turn reducing the
freeboard to Don Valley Parkway for flooding during riverine flooding events on the Lower
Don River.
• Potential impacts to other wastewater treatment facilities along the waterfront
The following sections detail impacts experienced within the TRCA jurisdiction in 2019
1) Impacts at 75.5m — 75.7m lake level (IGLD85 datum)
General impacts approaching critical water levels for Lake Ontario included ponding of water,
closure of some trails and increased erosion along the most vulnerable shoreline areas.
Impacts— May 1 to May 12, 2019
o Eastern Beaches
Flooding and inland ponding at Woodbine Beach due to breaching of sandbar -
impacting recreational beach, volleyball courts, public viewing areas for Victoria
Day fireworks
Flooding and impacts to Silver Birch Boathouse structure and adjacent
boardwalk trail; sandbags and armourstone overtopped
Extensive erosion to southern points of Ashbridge's Bay Park Spit due to
undercutting
o Rouge Beach
Closure to public - parking lot gates and washrooms due to flooding, this
persisted for months
o Scarborough Bluffs
Landslides and active shoreline erosion near Guild Inn Shoreline causing
deployment of crews for repair and implementation of closures to public trail
and access road
• TRCA also issued a Notice of Caution for the Scarborough Bluffs due to increased
risk of landslides on May 7`h, 2019.
Erosion along waterfront park at Bluffers Park
o Lakeshore Blvd
Flooding to lanes on Lakeshore Blvd due to reduced storm drainage during and
after rainfall on May 10`h - this continued to occur at other times
o Port Union
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
• Erosion at lakeside trail at Highland Creek mouth
o Toronto Islands
• Flooding/pooling of water in low lying areas
• Flooding of Roadway due to storm surge and waves breaching at Gibraltar Point
c Pickering/Ajax Waterfront
• Flooding/pooling of water at Paradise Park Beach in Ajax, including ditches up
to Ebony Rd.
• Closure of Ajax Waterfront Trail at Rotary Park in Ajax from Rotary Park to west
of pedestrian bridge due to erosion
2) Impacts at 75.7m - 76.Om lake level (IGLD85 datum)
Lake Ontario water levels between 75.7m to 76m (IGLD85 datum) in 2019 resulted in significant and
prolonged inundation, erosion, and debris washup leading to closure and significant degradation of
major roads, trails, boardwalks, residential buildings, Yacht Clubs, playground and park structures,
Ferry Docks, boat launches and docks, shoreline protection structures, turf and trees and
innumerable areas of the Toronto, Pickering, and Ajax waterfronts, as well as the Toronto Islands.
Conditions were exacerbated during times of heavy wind or wave activity which often overtopped
preventative measures such as sandbags, meter bags, aquadams, armourstone, etc.
New Impacts — May 13 to August 1, 2019
o Western Beaches
• Power shut -offs in electrical cabinets for Toronto Golf Club at Marie Curtis Park
• Flooding of parkland at Marie Curtis Park, Colonel Sam Smith Park and Humber
Bay Park West
• Urban drainage issues (catch basins beyond capacity) at Marie Curtis Park and
Lakeshore Blvd (WB & EB lane closures on June 101h)
• Flooded/submerged/closure of walking paths/trails/boardwalks at Humber
Bay Arch Bridge (at Humber River Mouth), Sunnyside Park, Budapest Park and
Marilyn Bell Park
• Flooded/submerged boat launches at Humber Bay Park West
• Flooded docks at Sunnyside Beach and Ontario Place Marina docks
• Flooded/submerged trees at Sunnyside Beach
• Erosion to walking paths/trails/boardwalks at Sunnyside Pavillion
• Erosion to beaches, shorelines and parklands at Marie Curtis Park, Humber Bay
Park East, Sunnyside Park and Budapest Park
• Damage to new fishing nodes at Humber Bay Park East
• Wave damage to boardwalk/trail at Budapest Park and Marilyn Bell Park
• Rowing/Canoe/Paddle and Dragonboat programming activities cancelled or
delayed at Sunnyside Paddling Club, The Boulevard Club, Toronto Sailing and
Canoe Club as well as the Argonaut Rowing Club
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
• Stream gauging equipment and data quality impacted (Lower Humber at Old
Mill) by prolonged high water levels on Lake Ontario due to backwater effects
• Flooding impacts to outdoor concert venue at Ontario Place (Live Nation's
Budweiser Stage) with main venue building and stage impacted
o Inner Harbour
• Toronto Music Garden —flooding of docking wall and electrical chamber
• Peter Street basin —water cresting on south side
• HTO Park — beach and dock/boardwalk area closed to the public due to flooding
and continuous wave action
• Harbour Square and Harbour Square Park— boardwalks closed due to flooding;
significant damage due to prolonged submergence of boardwalk structures
• Sugar Beach — promenade and electrical chamber flooded
• Stream gauging equipment and data quality impacted (Don at Dundas) by
prolonged high water levels on Lake Ontario due to backwater effects
o Eastern Beaches
• Power shut -offs at Rouge Beach Park (for 4 months)
• Urban drainage issues (catch basins beyond capacity) at Eastern Avenue on May
23rd and June 12`h
• Increased debris washing up along shorelines at Woodbine Beach (due to
increased wave activity and municipal water infrastructure being overwhelmed
or bypassed)
• Flooding/ponding of beaches at Woodbine Beach (10-80m into beach area
including lifeguard stations, volleyball courts and fireworks viewing area),
Bluffer's Park Beach (half of beach is underwater) and Rouge Beach
• Flooded/submerged/closure of walking paths/trails/boardwalks at Ashbridge's
Bay Park (Coatsworth Cut) and Rouge Beach (including parking lot)
• Flooded/submerged boat launches at Bluffer's Park
• Flooded/submerged wave decks/breaks at Woodbine Beach
Flooded structure at Kew Beach —Silver Birch Boathouse, required constant
pumping as sandbags were constantly being breached)
• Erosion of beaches and shoreline causing damage and/or closures to
trails/pathways/boardwalks at Ashbridge's Bay Park, Woodbine Beach, Kew
and Balmy Beaches, Bluffer's Park, Doris McCarthy trail along Scarborough
Bluffs, Port Union (East Point Park and Port Union waterfront trail) and Rouge
Beach
• Damaged/submerged/lost trees at Ashbridge's Bay
• Stream gauging equipment and data quality impacted (Rouge at Glenrouge
Campground) by prolonged high water levels on Lake Ontario due to backwater
effects
o Toronto Islands
• Flooding and Significant Erosion of beaches at Hanlan's Point Beach, Ward's
beach, and Manitou Beach
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Substantial and Prolonged Flooding of Roadways at Lakeshore Ave near
Gibraltar Point Lighthouse and Artscape, 500m stretch between the Royal
Canadian Yacht Club and Snake Island, and numerous stretches along Cibola
Ave. Water was continuous on Cibola Ave from Algonquin bridge to the Royal
Canadian Yacht Club. Noticeable deterioration of submerged roads on
Lakeshore Ave near Gibraltar point, and Cibola avenue. Condition of submerged
roads worsens daily
• Loss of safe Ingress/Egress on major roads due to depth of flooding. Toronto
Fire Service on delayed response as they have to pass through roads with 40 cm
of water on them. Ambulance needed to be towed as a result of bottoming out
near the Lighthouse.
• Substantial and Prolonged Flooding at southern section and entranceway of
Centreville Amusement Park, Toronto Island Marina's eastern edge, Parks yard
operational areas and buildings and fuel pump area, Innumerable in -land
flooding areas (approximately 1/3 of the islands), and Grandstand boardwalks.
• Closure of Ferry Service to Hanlan's Point for vehicles and pedestrians (major
accessway to Islands)
• Closure of Olympic island, Toronto Islands Grandstand, and Snake Island
• Shoreline Protection overtopped due to high lake level in conjunction with
wave/surge action, affecting residential area along Seneca Ave on Algonquin
Island, the Queen City Yacht Club, and the cove area of Ward's Island.
• Substantial turf and tree damage across the islands
• Gas service shutoff at meter to 6 Channel Avenue, due to floodwaters in
contact with furnace
• Numerous event cancellations
o Pickering/Ajax Waterfront
• Flooding, Erosion, and Debris Washup of undermining trees, armourstone
rocks, benches on pads, and boardwalk at Millennium Square in Pickering
• Closure and removal of two playgrounds at Millennium Square in Pickering
(Flooding from waves and debris washup) , and Canoe club in Pickering
• Road and Trail Closures near Paradise Park (Lakefront Trail, Ruthel Rd and
Ebony St) due to backwater from Lake, and Frenchman's Bay Beachpoint
Promenade due to flooding and debris washup
• Exposed Pipe from Pickering Nuclear Generating Station washed up on beach
• Armourstone Displacement and undercutting of concrete path at Frenchman's
Bay Harbour Entrance.
Slope Failure at 58 Ontoro Blvd Ajax (within Central Lake Ontario Conservation
Authority's jurisdiction) involving 38m long failure crest 10m from the
residence. Slopes and seawalls for 10-12 homes have been damaged to the
point of failure.
• Hydrostatic Lake Level seepage impacting homes/basements along
Frenchman's Bay
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Substantial Erosion at Beachpoint promenade, Frenchman's Bay harbour
entrance pier, and the beach, boardwalk, washroom building adjacent to
Nuclear Plant in Pickering. Substantial Erosion and loss of trail and waterfront
area near Rotary Park in Ajax.
Photo 1: Bluffer's Park Flooded Boat Launch, Toronto — overhead drone view on June 26, 2019
II I
f�
Photo 1: Bluffer's Park Flooded Boat Launch, Toronto — overhead drone view on June 26, 2019
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Photo 2: East Point Park (Port Union) waterfront trail erosion, Toronto June 28, 2019
Photo3: Flooded Rouge Beach Park and parking lot, Toronto —June 27, 2019
;._�j
-E ` r
�,'
'�-
Attachment 2 — Summary of Lake Impacts 2019 sent to Great Lakes Adaptive Management Committee
Photo 6: Erosion at Ajax Waterfront Park near Water Supply Plant, Ajax —June 24, 2019
Section III — Items for the Information of the Board
RESMA36120 - 2019 YEAR END FINANCIAL REPORT
Receipt of Toronto and Region Conservation Authority's (TRCA)
unaudited financial report as of December 31, 2019 for informational
purposes.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
IT IS RECOMMENDED THAT the 2019 Year End Variance Report for the year ended
December 31, be received.
CARRIED
BACKGROUND
As part of TRCA's financial governance procedures, this report presents the 2019 Twelve Month
Financial Report, which covers the spend rate of expenditures and recognition of revenue for all
of 2019. For the purposes of this report, TRCA's four categories of revenue have been
combined into one category titled 'Revenue' in the attached financial charts. This includes:
• Authority Generated: Revenues raised through activities such as user fees, retail,
rentals, program fees, event fees, and investment and interest income.
• Government Funded: Municipal, federal and provincial grants and contract services.
• Levies: Operating and Capital levies from municipal partners.
• Reserves: Accumulated surplus which is intended to finance unforeseen costs related to
ongoing operations or unfunded capital expenses for the organization.
RATIONALE
TRCA believes in transparency and accountability for its spending, revenue recognition and
performance of service delivery objectives against approved budgets, for both the organization
and for each project and program as an individual endeavor. This is further supported by
TRCA's core values which prioritize accountability of staff to be increasingly responsible for their
actions, behaviors and outcomes. TRCA recognizes that all projects and programs offered have
cost implications and that all costs incurred are in support of services being practical and
affordable. Transparency throughout the budget management process is achieved in part
through the analysis and reporting on year to date revenues/expenses as compared to the
current fiscal year budget. In order to improve the accuracy in reporting anticipated issues in
expenditures, TRCA established a seasonal forecasting baseline using historical data from the
past three years to estimate the seasonal variances within each program area.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
FINANCIAL DETAILS
The operating and capital report by Service Area and underlying Program Areas are provided in
Attachments 1-5 respectively. The attachments provide a summary analysis of expenditures
and revenues to date and the variance explanations by Program Area. The variance threshold
for both revenues and expenditures are +/- 10% and $500,000 from anticipated. Variances
within these thresholds are deemed to be within the expected range.
DETAILS OF WORK TO BE DONE
As TRCA's financial governance procedures and systems continue to evolve over time, internal
processes for in -year billing from vendors, invoicing of customers and recognition of deferred
revenue/internal recoveries will become a greater area of focus for the organization.
Report prepared by: Jenifer Moravek, extension 5659
Emails: jenifer.moravek(a)trca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: michael.tolenskycDtrca.ca
Date: March 19, 2020
Attachments: 5
Attachment 1: Twelve Month Variance
Attachment 2: Twelve Month Variance
Attachment 3: Twelve Month Variance
Attachment 4: Twelve Month Variance
Attachment 5: Twelve Month Variance
Report
— Operating Budget Expenditures
Report
— Operating Budget Revenues
Report
— Capital Budget Expenditures
Report
— Capital Budget Revenues
Report —Variance Explanations
ATTACHMENT 1: OPERATING
Watershed Planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
BlodWerslty Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace 5ecurement
Greenspace Management
Rental Properties
Waterfront Parks
Conservation Parks
Trolls
Bathurst Glen Golf Course
Black Creek Pioneer Village
Events and Festivals
Wedding and Corporate Events
Development Plannir,,and Regulation Permitting
Emlronmental Assessment Planning and Permitting
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
Living City Transition program
Community Engagement
Social Enterprise Development
Financial Management
Corporate Management and Governance
Human Resources
Corporate Common cations
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Grand Total
Q42019 Anticipated
442019 Actual
442019 Variance
Reportable
Anticipated
Anticipated 44
Actual
$ Difference
% Difference
Expenditure
Expenditures
Spend l%1
Expenditures
Actual Spend Rate
Expenditures
Spend Rate
Variance
1,581,,4,4,4
100%
1,613,331
103%
141,5371
-3°G
...........:..
a%
..............
....:........
o%
.............
...:........
a%
............
............
a%
a%
a%
118],200
100%
1036209
81%
150,991
13%
29,300
.,.,.,...
100%
43.]33
. .
1.......
(1414331
'49%
...........
............
...........
...:.
........
0%a%
......
........................
.....
...
.......
.........
......
............
a%
......
............
......
.........
]9:000
.........
100%
.........
131203
.........
166%
........
152 2031
........
66%
........
s2s,200
....
.....
100..%..
......
499,9..4.. .
.....
....
.......
. ....
s%
............
0%
1]9,400
IDO%
545,932
]0%
233468
30%
1910,600
........
100%
..........
........
.........
...91�
...
SJs,333
...........
9%
............
0%0%
0%
.........
5522,950
.........
100%
.........
3824,1'12.
.........
105%
........
(301222'
........
-5%
........
0%
4]3
0%
(4]31
0%
1314,400
100%
1,0677
82%
242,623
18%
4232,450
100%
39I6pZ2
94% I
256,028
6%
5%
311335
.5%
..............
...:.
..............
0%0%
......
...........................
.....
...
. _..
............
......
............
0%
......
............
......
6543,300
100%
3932238
91%
611042
9%
lica%
3,119,989
8%
8611511
.22%
A
............................
492:800
100%
.............
445,435
.............
90%
............
4],365
............
]0%
............
..............
5356,130
.....
100%
....
4633,548
.......
8]%
......
]22,582
....
13%
......
0
.
..
151149,
.,, 2%,
1010:800
100%
944548
93%
66252
J%
..............
146.300
.1...........
100%
.........8
142,9)8
.........%
98%
...22
3322
...2%
2%
........
292,600100%
385,,554
132S....
1.. ...
32%
..............
.......0..%. ..
...........
.....a.%.
...........
.....0.%.
............
3,018,800
10O%
2,18$430
92%
230,370
0%
__.
s 830,000
__.._%
100%
S 358012
92%
419,988
.8%
1_.., _
248
85%
193 252
15%
............................
1,811,000
100%
.............
1,626,125
.............
90%
........
184,813
30%
z601,600
100%
2601,213
100%
.381
0%
(5,498,000)
100%
@,167,1161
58%
12,330,8841
42%
C
..............
........
..............
100%
.............
194�852�
.......
_95%
......
45,402,430
100%
43,]08,12]
96%
1,694,303
4%
ATTACHMENT Z: OPERATING BUDGET REVENUES
Anticipated Anticipated Qat Actual I Actual I $Difference I %Difference I Revenue
Watershed planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
Biodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement
Greenspace Management
Rental Properties
Waterfront Parks
Conservation Parks
Trails
Bathurst Glen Golf Course
Black Creek Pioneer Village
Events and Festivals
Wedding and Corporate Events
Development Planning and Regulation Permitting
Environmental Assessment Planning and Permitting
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
Living City Transition Program
Community Engagement
Social Enterprise Development
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
project Recoveries
Vehicles and Equipment
Grand Total
ATTACHMENT 3: CAPITAL BUDGET EXPENDITURES
Watershed Planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
Biodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement
Greenspace Management
Waterfront Parks
Conservation Parks
Trails
Black Creek Pioneer Village
Events and Festivals
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
Living City Transition Program
Community Engagement
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Grand Total
Anticipated I Anticipated Q4 I Actual I Actual Spend I $Difference I %Difference I Expenditure
H
M
ATTACHMENT 4: CAPITAL BUDGET REVENUES
Watershed Planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
Riodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement
Greenspace Management
Waterfront Parks
Conservation Parks
Trails
Black Creek Pioneer Village
Events and Festivals
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
Living City Transition Program
Community Engagement
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Grand Total
Anticipated Anticipated Q4 Actual Actual SpendI $Difference I %Difference I Revenue
Revenues Revenue Rate (%1 Revenues Rate f%1 Revenues Soend Rate Variance
R
T
U
V
M
Y
Z
ATTACHMENTS: VARIANCE EXPLANATIONS
OPERATING REPORTABLE VARIANCE NOTES - EXPENDITURES (Figures in 000's)
A
The York Region permit review staff compensation account and Metrolinx environmental assessment review projects have
E
lower than anticipated expenditures as a result of staff gapping. Once these are taken into consideration, the variance is ($328)
and -8% which is within the acceptable threshold.
B
The Claremont and Albion Hills Field centre expenditures are lower than anticipated as a result of staff gapping. Once these are
F
taken into consideration, the variance is ($446) and -8% which is within the acceptable threshold.
C
The lower than anticipated recoveries are due to timing, as there were delays in the execution of capital projects. Once this is
taken into consideration, the variance is ($1) and 0% which is within the acceptable threshold.
OPERATING REPORTABLE VARIANCE NOTES - REVENUES (Figures in 000's)
D
Revenue is lower than anticipated due to a limited number of high value permit applications throughout 2019. Once this is
taken into consideration, the variance is $7 and 0% which is within the acceptable threshold.
E
The lower than anticipated revenues are as a result of both reduced bookings at Kortright from school board job action in Q4,
and staff gapping which resulted in fewer funding applications for education programming support. Once this is taken into
H
consideration, the variance is ($411) and -8% which is within the acceptable threshold.
F
This variance is reflective of the 2018 and 2019 NEER rebate which was received in 2019. Once this is taken into account, the
variance is $0 and 0% which is within the acceptable threshold.
CAPTIAL REPORTABLE VARIANCE NOTES - EXPENDITURES (Figures in 000's)
G
The higher than anticipated expenditures are due to the stormwater management pond contract services with the City of
Toronto which is fully cost recoverable. Once this is taken into account, the variance is ($56) and -1% which is within the
acceptable threshold.
H
The lower than anticipated expenditures in Erosion Management is related to a number of major capital works project delays
resulting in the under expenditure including: the East Don Trail which is delayed as a result of the approvals with Metrolinx and
the construction activities of the trail; Ashbridges Bay which is awaiting additional approvals prior to mobilization; Bluffers Park
South Headland project which has now commenced but will not be complete until Q3 2020; Upper Highland Creek trail at
Ellesmere which is continuing through the approvals phase with construction delayed until Q1 2020; DMAF infrastructure
projects which are in negotiations with private land owners and anticipated to be initiated once the agreements are executed i
Q1 of 2020; and a number of other major works which are temporarily delayed as a result of agreement execution and
negotiations. Once these are taken into account, the variance is ($7,234) and -9% which is within the acceptable threshold.
Expenditures are lower than anticipated due to a delay in the planning phase of The Meadoway Project. The 2019 scope of
work has been revised and delayed until 2020. Additionally, the Menno-Reesor Restoration and Renovation project is
underspent in 2019 as a result of a reduction in the scope of work following the transfer of land to Parks Canada. Once these
are taken into account, the variance is ($1,096) and -7% which is within the acceptable threshold.
J
Greenspace land acquisition expenditures are lower than anticipated as expenses are contingent on the availability of land for
acquisition. Once this is taken into consideration, the variance is $109 and 4% which is within the allowable threshold.
K
Expenditures are lower than anticipated due to a delay in the Scarborough Bluffs West Environmental Assessment which is
awaiting direction from the City of Toronto on the timeline to launch the Environmental Assessment. It is expected a decision
will be made by the end of Q2 2020. Additionally, the Scarborough Waterfront Project Environmental Assessment was
approved in Q4 2019 and will commence in Q1 2020. Once these are taken into account, the variance is $6 and 0% which is
within the acceptable threshold.
L
The expenditures are lower than anticipated as a result of the following projects: Black Creek Trail at Shoreham which will be
complete in Q2 2020; the Don Mills trail which experienced delays related to the approvals associated with private land owner
agreements; the Martin Goodman Trail which was temporarily delayed and will be complete in Q2 2020; and the Franklin
Children's Garden which was delayed due to high water levels, and will be complete in Q3 2020.Once these are taken into
account, the variance is ($362) and -5% which is within the acceptable threshold.
M
The lower than anticipated expenses are a result of delays with the Bolton Camp recreational infrastructure projects, with
phase one retrofits ongoing into 2020. Additionally, the water and waste water site infrastructure project was initiated in 2019
and will continue into 2020. Once these are taken into account, the variance is $185 and 2% which is within the acceptable
R
threshold.
N
Expenditures are lower than anticipated due to: reduced scope of work in 2019 for the electric vehicle charging stations as per
joint decision between GTAA and TRCA; reprioritizing Community Transformation deliverables in accordance with municipal
guidance; lower than anticipated partnership and grant contributions in the STEP program resulting in a reduced scope of work;
and ongoing staff gapping in the SNAP program resulting in deliverables being deferred into 2020. Once these are taken into
account, the variance is ($557) and -8% which is within the acceptable threshold.
O
Expenditures are lower than anticipated due to staff gapping in the following programs: the Spills Database Program; Black
Creek Community Farm project; and the Central Counties Environmental Plan. Additionally the Toronto Golf Club Fish Barrier
S
project has been deferred to Q3 2020 as a result in staffing changes at the Golf Course; and the reforestation program on
private lands experienced a reduction in funding through the Province's 50 million trees campaign requiring a scaling down of
activities. Once these are taken into account, the variance is ($259) and -9% which is within the acceptable threshold.
P
The lower than anticipated expenditure is related to the Head Office Construction Project which was delayed in obtaining site
plan approval. Once this is taken into consideration the variance is ($1,292) and -8% which is within the acceptable threshold.
CAPTIAL REPORTABLE VARIANCE NOTES - REVENUES (Figures in 000's)
Q
The higher than anticipated revenues are due to additional work with stormwater management pond contract services in
partnership with the City of Toronto which is fully cost recoverable. Once this variance is taken into account, the variance is
($150) and -3°%which is within the acceptable threshold.
R
The lower than anticipated revenues in Erosion Management are related to a number of major capital works project delays
including: the East Don Trail which is related to delays in approvals with Metrolinx and the construction of the trail; Ashbridges
Bay which is awaiting additional approvals prior to mobilization; Bluffers Park South Headland project which has now
commenced but will not be complete until Q3 2020; Upper Highland Creek trail at Ellesmere which is continuing through the
approvals phase with construction delayed until Q2 2020; DMAF infrastructure projects which are in negotiations with private
land owners and is anticipated to be initiated once the agreements are executed in Q2 of 2020; and a number of other major
works which are temporarily delayed as a result of agreement execution and negotiations. Once these are taken into account,
the variance is ($5,988) and -7% which is within the acceptable threshold.
S
Revenue is lower than anticipated due to a delaying in the planning phase for The Meadoway Revitalization Project. Funds will
be released from Toronto and Region Conservation Foundation in 2020 for future maintenance and adaptive management
within the Meadoway. Additionally, the Menno-Reesor Restoration and Renovation project received less than anticipated
revenues as a result of a reduction in the scope of work following the transfer of land to Parks Canada. Once this is taken into
consideration, the variance is ($837) and -5% which is within the acceptable threshold.
T
Revenue is lower than anticipated due to a delay in the sale of the Speirs property which is to be completed in Q12020.Once
this is taken into consideration the variance is $0 and 0% which is within the acceptable threshold.
U
Revenues are lower than anticipated due to a delay in the Scarborough Bluffs West Environmental Assessment which is
awaiting direction from the City of Toronto on the timeline to launch the Environmental Assessment. It is expected a decision
will be made by the end of Q2 2020. Additionally, the Scarborough Waterfront Project Environmental Assessment was
approved in Q4 2019 and will commence in Q1 2020. Once these delays are taken into account, the variance is $49 and 2%
which is within the acceptable threshold.
V
Revenue is lower than anticipated due to a delay in obtaining permits for the Claireville Trail which are now anticipated in Q2
2020; the Black Creek Trail at Shoreham which will be complete in Q2 2020 with the final site planting; the Don Mills trail which
experienced delays related to private land owner agreement approvals; the Martin Goodman Trail which will be complete once
the final plantings are executed in Q2 2020; and the Franklin Children's Garden which was delayed due to high water levels, and
will be complete in Q3 2020; and the Claireville Trail which was delayed into 2020 and will transfer funds from the Toronto
Region Conservation Foundation to cover expenses. Once these are taken into account the variance is ($362) and -5% which is
within the acceptable threshold.
W
The revenue variance represents unspent funds for site servicing which is expected to be resolved in 2020. Once this is taken
into account, the variance is $247 and 3% which is within the acceptable threshold.
X
Revenues are lower than anticipated due to: a reduced scope of work in 2019 for the electric vehicle charging stations as per
joint decision between GTAA and TRCA; reprioritizing deliverables within community transformation program in accordance
with municipal guidance; and lower than anticipated partnership and grant contributions in the STEP program. Once these are
taken into account, the variance is ($569) and -8% which is within the acceptable threshold.
y
The lower than anticipated revenues are as a result of the Toronto Golf Club Fish Barrier project being deferred into 2020; the
Black Creek Community Farm project which has been delayed into 2020; and the reforestation program on private lands which
experienced a reduction in funding through the Province's 50 million trees campaign. Once these are taken into consideration,
the variance is ($263) and -9% which is within the acceptable threshold.
Z
The lower than anticipated revenues for the Head Office Construction Project are due to delays in obtaining site plan approval.
Once this is taken into consideration the variance is ($1,285) and -8% which is within the acceptable threshold.
RES.#A37/20 - 2020 BUDGETARY UPDATE - COVID-19 IMPACT
Toronto and Region Conservation Authority's (TRCA) 2020 Budgetary
Update, reflecting the impact of COVID-19 for information of the Board.
Moved by: Jack Heath
Seconded by: Jennifer Drake
IT IS RECOMMENDED THAT The 2020 Budgetary Update — COVID-19 Impact report be
received.
CARRIED
BACKGROUND
The current global COVID-19 pandemic and Provincially declared emergency has resulted in
closures of TRCA facilities as well as the cancellation of TRCA events and programs. These
closures were initiated in mid-March impacting several events and programming planned for
March break. Continued restrictions will dramatically impact TRCA's business models, primarily
in the Education and Training and Parks and Culture Divisions.
RATIONALE
TRCA revenues are grouped predominantly into two categories: Government funding and
Authority generated revenues. It is projected by staff that most projects and programs that rely
on government funding will be able to continue operating within a COVID-19 environment,
however, if any deliverables are impacted, these initiatives will be assessed accordingly.
To date, TRCA has already closed its public facilities and cancelled public events starting in
March 2020, extending to the end of June 2020, with additional cancellations anticipated to
follow. With ongoing restrictions anticipated in 2020, TRCA's ability to earn authority generated
revenues, such as user/participant fees, will be considerably reduced.
In 2018, for example, Tourism and Recreation and Education and Outreach comprised $14.9
million of the organization's $36.8 million authority generated revenue (40%). When considering
additional potential decreases in Service Areas throughout the organization, such as
Greenspace Securement and Management and Planning Development Review, staff predict a
worst-case scenario in which TRCA's 2020 budgeted operating revenues fall in excess of $20
million.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
DETAILS OF WORK TO BE DONE
Staff are constantly analyzing TRCA's 2020 operations in the context of COVID-19's impact on
the organization's revenues and expenditures and potential for government funding to reduce
the repercussions to our staff compliment, while ensuring that the safety of staff and the public
is maintained.
This includes potential funding opportunities through the Federal Government's COVID-19
Economic Response Plan, such as the Canada Emergency Wage Subsidy (CEWS) and
changes to the Canada Summer Jobs program. Staff will continue to monitor these programs
and conduct ongoing communications with the program officers to ensure that the maximum
allowable benefits are realized.
Report prepared by: Jenifer Moravek, extension 5659
Emails: jenifer.moraveKi)trca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: michael.tolenskyCcbtrca.ca
Date: April 9, 2020
RES.#A38120 - SENIOR STAFF EXPENSES
Summary report of senior staff expenses for 2019.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
IT IS RECOMMENDED THAT the summary of senior staff expenses for Toronto and
Region Conservation Authority's (TRCA) Chief Executive Officer, Chief Financial and
Operating Officer, Chief Human Resources Officer and Divisional Directors for the year
ended December 31, 2019, be received.
CARRIED
BACKGROUND
At Toronto City Council on November 29, 30 and December 1, 2011, the following resolution
was approved:
City Council approve the publication on the City's public website on a semi-annual basis,
commencing with the 2011 calendar year, expenses related to business travel,
conferences and training, hospitality, and protocol for senior staff positions at the
Division Head level and above.
City Council provide a copy of this Item to the City's major agencies and corporations
requesting that they adopt a similar policy for their organization if they have not already
done so.
In accordance with the above resolution, TRCA staff advised the City of Toronto that TRCA staff
will report to the Authority annually on the expenses outlined within the City staff report dated
October 19, 2011, Feasibility of Publishing Expense Details of Senior City Staff on the City's
Website. TRCA commenced this summary reporting practice in 2013 to include expenses of
TRCA's Chief Executive Officer, Chief Financial and Operating Officer and divisional Directors.
This information will be available on TRCA's website as part of this report in the minutes of the
meeting.
The following expenses have been detailed in Attachment 1:
Business travel, which includes any mileage reimbursement with a personal vehicle, or
operating costs of a TRCA vehicle provided to staff;
Conferences and training, which includes registration fees, accommodations and per diem
allowances;
Hospitality expenses, which includes hosting non -staff at TRCA events, eating
establishments or other permitted locations.
Additional expense information can be provided in -camera, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
Report prepared by: Pamela Papadopoulos, extension 5973
Emails: pamela.papadopoulosCcDtrca.ca
For Information contact: Pamela Papadopoulos, extension 5973
Emails: pamela.papadopoulosCcDtrca.ca
Date: April 9, 2020
Attachments: 1
Attachment 1: Summary of Senior Staff Expenses for 2019
Attachment 1: Summary of Senior Staff Expenses for 2019
John MacKenzie, Chief Executive Officer
Business Travel
11,040
Conferences and Training
980
Hospitality and Protocol
169
Total
12,189
Michael Tolensky, Chief Financial and Operating Officer
Business Travel
880
Conferences and Training
987
Hospitality and Protocol
-
Total
1,867
Natalie Blake, Chief Human Resources Officer (Sept — Dec 2019)
Business Travel
Conferences and Training
Hospitality and Protocol
Total
Derek Edwards, Director, Parks and Culture
Business Travel
7,054
Conferences and Training
465
Hospitality and Protocol
-
Total
7,519
Darryl Gray, Director, Education and Training
Business Travel
6,460
Conferences and Training
1,788
Hospitality and Protocol
90
Total
8,338
Chandra Sharma, Director, Community Engagement and Outreach (Jan — Nov 2019)
Business Travel
1,165
Conferences and Training
Hospitality and Protocol
36
Total
1,201
Nick Saccone, Director, Restoration and Infrastructure (Jan — March 2019)
Business Travel
1,588
Conferences and Training
Hospitality and Protocol
98
Total
1,686
Moranne McDonnell, Director, Restoration and Infrastructure (April - Dec 2019)
Business Travel
1,588
Conferences and Training
1,421
Hospitality and Protocol
117
Total
3,126
Sameer Dhalla, Director, Development and Engineering Services (Feb - Dec 2019)
Business Travel
1,534
Conferences and TrainingHospitality
and Protocol
31
Total
1,565
Laurie Nelson, Director, Policy Planning (Feb - Dec 2019)
Business Travel 455
Conferences and Training -
Hospitality and Protocol -
Total 455
RES.#A39/20 - 2019 FREEDOM OF INFORMATION REQUEST SUMMARY
A summary of access to information requests completed by Toronto and
Region Conservation Authority in 2019 under the Municipal Freedom of
Information and Protection of Privacy Act.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority is subject to annual reporting
requirement under the Municipal Freedom of Information and Protection of Privacy Act;
IT IS RECOMMENDED THAT 2019 Freedom of Information Request Summary report, be
received.
CARRIED
BACKGROUND
Toronto and Region Conservation Authority (TRCA) is subject to the Municipal Freedom of
Information and Protection of Privacy Act (the Act). TRCA is also subject to the provisions of the
federal Personal information Protection and Electronic Documents Act (PIPEDA).
Under subsection 26(1) of the Act, the institution is required to submit an annual report to the
Information and Privacy Commissioner of Ontario (IPC) that provides statistics related to requests
for access to information. This document provides a summary of statistics included in the TRCA
2019 annual report to the IPC, which was submitted on February 21, 2020.
Under the Act, TRCA reports on two types of information requests: requests for general records
and requests for personal information. The former captures requests for information about
someone else, while the latter is concerned with requests for `own personal information",
requested by an individual or their agent.
All requests must be completed within 30 calendar days, with the exception of cases when a
Notice of Extension or a Notice to Affected Person is issued, which extends the request
processing timeline.
RATIONALE
In 2019 TRCA received forty-eight (48) new requests for information under the Act. Fourty-six (46;
of these requests were completed, while two (2) were carried forward to 2020 because
the requests were received and entered in December and therefore had automatic
legislative deadlines that extended into the following year. Additional seven (7) requests, carried
over from 2018, were completed in 2019.
Of the fifty-three (53) completed requests, fifty-two (52) were related to "general records" and one
(1) was related to "personal information".
Twenty-one (21) of these requests were received from individuals/public, 28 from businesses, 2
from an agent representing an individual, 1 from media, and 1 from government (all levels).
Of the 53 requests completed in 2019, 52 were completed within the legislated timelines, while
one request was completed 1 day late due to the need for legal review. Overall, the requests were
processed as follows:
• 32 were processed in 30 days or less;
• 20 were processed in 31-60 days, resulting from a duty to issue a Notice to Affected
Person and/or a need to issue a Notice of Extension.
1 request was processed in 91 days or longer, resulting from a duty to issue a Notice to
Affected Person and a need to issue a Notice of Extension.
In response to the 53 requests, the following was disclosed:
• all information was disclosed in 3 cases;
• information was disclosed in part in 25 cases (partial information);
• no responsive records existed in 19 cases (partial information);
• request was withdrawn, abandoned or non -jurisdictional in 6 cases.
When partial information was disclosed, the exclusions used for non -disclosure were as follows,
and for the illustrated number of requests:
• Section 7 — Advice or Recommendation: 1
• Section 8 - Law Enforcement: 2
• Section 10 - Third Party Information: 9
• Section 11 - Economic/Other Interests: 3
• Section 12 - Solicitor -Client Privilege: 5
• Section 13 — Danger to Safety or Health: 1
• Section 14 - Personal Privacy (Third Party): 21
• Section 15 - Information soon to be published: 2
The Act provides the requester and affected third party with the right to appeal TRCA's decisions
to the Information and Privacy Commissioner of Ontario. There are three stages in an appeal:
intake, mediation and adjudication. Two (2) TRCA decisions were appealed to the IPC in 2019.
One (1) of the appeals is currently in the mediation phase and one (1) is in the adjudication phase.
Two (2) outstanding appeals from 2017 and one (1) appeal from 2018 were successfully resolved.
Furthermore, in accordance with the provisions of Municipal Freedom of Information and
Protection of Privacy Act, provincial Freedom of Information and Protection of Privacy Act, and
federal Privacy Act, other institutions regularly consult TRCA prior to issuing a decision related to
TRCA's records in their custody or control (so-called third party records). In 2019 TRCA
responded to six (6) third party consultation notices.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
FINANCIAL DETAILS
Section 45 of the Act and section 6 of Regulation 823 prescribe fees associated with the
processing of requests. A requester is required to pay an initial, mandatory application fee of $5,
with the possibility of additional fees depending on the nature of the request. These fees may be
charged for photocopying, search, and preparation time. In 2019, TRCA collected a total of
$1,806.60 in such fees. In keeping with the spirit of the Act to make records accessible to the
public, TRCA does not charge fees for requests that take under half an hour to process, or in other
circumstances where a fee waiver may be considered appropriate. A total of $62.40 of fees were
waived accordingly.
Report prepared by: Alisa Mahrova, extension 5381
Emails: alisa.mahrova(&trca.ca
For Information contact: Alisa Mahrova, extension 5381
Emails: alisa.mahrova(catrca.ca
Date: February 21, 2020
RES.#A40/20 - RESULTS OF BLACK CREEK HISTORIC BREWERY COMPETITIVE
PROCESS
This report summarizes the results of Toronto and Region Conservation
Authority's (TRCA) competitive process for the exclusive license to
operate Black Creek Historic Brewery.
Moved by: Maria Kelleher
Seconded by: Linda Jackson
WHEREAS TRCA staff were authorized to pursue a competitive process to secure a
proponent for the exclusive license to operate Black Creek Historic Brewery;
AND WHEREAS TRCA received no submissions meeting the mandatory criteria and
technical proposal submissions requirements;
IT IS RECOMMENDED THAT this report be received and that TRCA staff be requested to
explore opportunities to leverage our partnership.
CARRIED
BACKGROUND
At Board Meeting #4/19, held on Friday, April 26th, 2019, Resolution #A53/19 was approved in
part as follows:
THEREFORE, LET IT BE RESOLVED THAT staff be authorized to prepare a Request
for Proposal for exclusive license to operate the BCHB, subject to terms and conditions
satisfactory to staff and TRCA's solicitor;
AND THAT staff be directed to undertake a competitive process and report to the Board
with the results.
Subsequently, on August 8, 2019, staff issued the Expressions of Interest (EOI) to fifty-five (55)
prospective candidates for a period of seven (7) weeks and closed the submission on
September 27, 2019. The EOI included the operation of an on-site brewery for production and
demonstration purposes as well as the operation of an off-site commercial brewery to produce
historic ale that would be sold at LCBO, the Beer Store and other retail outlets.
One submission was received, and it was deemed unsuccessful because it failed to meet the
mandatory criteria and technical proposal submissions requirements.
On January 22, 2020, based on internal direction resulting from earlier EOI responses, staff
resubmitted an updated EOI to one hundred (100) prospective vendors for a period of four (4)
weeks and closed the submission on February 19, 2020. The proposed expression included the
operation of an off-site commercial brewery to produce beer to be sold at LCBO, the Beer Store
and other retail outlets, however, the prospective vendor was not required to conduct
educational demonstrations on-site or to brew historic ale exclusively.
One submission was received, from the same vendor that submitted the first time. The
submission was again deemed unsuccessful because it failed to meet the mandatory criteria
and technical proposal submissions requirements.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 6 — Tell the Story of the Toronto Region
The continued operation of the on-site historic demonstration brewery, as well as the use of
historical beer recipes, tells the story of the region's rich history in ways that can be experienced
through taste.
Strategy 7 — Build partnerships and new business models
This partnership will attract new user markets to Black Creek Pioneer Village, contributing to
further growth within the Tourism and Recreation Service Area.
DETAILS OF WORK TO BE DONE
Moving forward, TRCA staff will continue to explore opportunities to leverage our Food Service
vendor to utilize the brewery space and increase revenues for Black Creek Pioneer Village.
Report prepared by: Julia Del Monte, ext. 6418, Amanda Lazarevski, ext. 6425
Emails: Julia.DelMonte(a)trca.ca, Amanda. Lazarevski(a)trca.ca
For Information contact: Geri Smith, ext. 5406, Wendy Rowney, ext. 5407
Emails: Geri. SmithCcDtrca.ca, Wendy. Rowney(a?trca.ca
Date: March 12, 2020
RES.#A41/20 - 2020 EROSION RISK MANAGEMENT PROGRAM UPDATE
An information report regarding the Erosion Risk Management Program
and related services and strategic updates from the Engineering Projects
business unit of Restoration & Infrastructure.
Moved by: Ronald Chopowick
Seconded by: Gordon Highet
WHEREAS TRCA staff were requested by the Executive Committee at meeting #3/19 to
provide more information regarding the positive impact that the Federal Disaster
Mitigation & Adaptation Fund will have on TRCA's plans for erosion mitigation work;
IT IS RECOMMENDED THAT this staff report on TRCA's Erosion Risk Management
Program and the positive impacts of Federal Disaster Mitigation & Adaptation Fund and
partner contributions be received;
AND FURTHER THAT this report be circulated to TRCA's municipal partners.
CARRIED
BACKGROUND
Managing the risk associated with the natural hazards of flooding and erosion is one of the
primary roles of conservation authorities under the Conservation Authorities Act. Toronto and
Region Conservation Authority (TRCA) fulfills this role through the delivery of multiple natural
resource management programs and services, including the Erosion Risk Management
Program (ERMP). The ERMP focuses on the identification and remediation of shoreline and
valley land erosion hazards throughout TRCA's jurisdiction and encourages proactive
prevention, protection, and management of erosion issues on private and public property.
While many business units in TRCA work to prevent and address erosion impacts, the main
business unit that manages erosion hazards is Engineering Projects (EP) which is organized
under the Restoration and Infrastructure Division (R&I). Under the ERMP, erosion hazards
across TRCA's watersheds are identified and ranked on a priority basis. EP staff regularly
conduct site visits throughout the year to assess and reprioritize erosion hazards in response to
major weather events. As such, the list of priority sites is not static, and the ranking of sites may
change within any given year as site conditions evolve or as new erosion hazard sites are
identified. Stabilization works are conducted annually to address erosion hazards based on the
available funding. In general, the ERMP is capitally funded through TRCA's partners at the City
of Toronto, Region of Peel, York Region, Durham Region, and on a project -by -project basis by
the Ministry of Natural Resources and Forestry.
This report is also being brought forward following the announcement of TRCA's success in
receiving $22 million of additional funding over 10 years from Infrastructure Canada's Disaster
Mitigation & Adaptation Fund (DMAF) for the Toronto Region Ravine Erosion Risk Management
and Hazard Mitigation Project. While this funding will help accelerate critical erosion control
work to protect private property and infrastructure throughout TRCA's jurisdiction, there is still a
significant backlog of structures to be repaired or hazards to be addressed. Metrics highlighting
this have been provided in the rationale below for the different portfolios under the ERMP.
RATIONALE
The following will provide a brief overview of the various portfolios and major programs operated
under the ERMP.
Toronto Ravine Major Maintenance
The Toronto Ravine Major Maintenance portfolio is for repairing and maintaining TRCA's
permanent erosion control assets across the City of Toronto. These structures are found along
ravine and valley corridors or along natural slopes. Repairs are prioritized based on a number of
factors such as: asset age; remaining service life; proximity of permanent buildings or essential
infrastructure; consequence of failure; and current condition of the asset. In 2020, TRCA is
planning 18 projects under the Toronto Ravine Major Maintenance portfolio and 16 of these
projects will have 40% of the project costs funded by DMAF (approximately $750,000).
Toronto Ravine Major Maintenance - Summary
and Metrics
Comments
Estimated capital levy 2020-2029
$18,000,000
City of Toronto levy only
DMAF contribution 2020-2028
$3,772,800
DMAF ends 2028
Total funding available 2020-2029
$21,772,800
# of existing TRCA owned erosion
300
control structures
$105,794,667
# of structures scheduled for
35
maintenance - levy only
Without DMAF estimated number of
# of structures scheduled for
51
structures repaired 2020-2029 = 35
maintenance 2020-2029
68% increase
Total # of structures in backlog
203
Backlog = structures requiring repair
after 2029
prior <2029 but no funding allocated
Toronto Waterfront Major Maintenance
The Toronto Waterfront Major Maintenance portfolio is for repairing and maintaining TRCA's
network of permanent shoreline erosion control assets along the City of Toronto waterfront.
These structures are found along the north shore of Lake Ontario and are designed to protect
the shoreline, adjacent tableland, public amenities, and infrastructure from erosion. Many of
these assets are nearing the end of their lifespan and over the past three years catalogued
damages to the structures have increased significantly due to multiple severe weather events.
In 2020, TRCA is planning 7 projects under the Toronto Waterfront Major Maintenance portfolio,
5 of which will have 40% of the project costs funded by DMAF (approximately $1 million).
Toronto Waterfront Major Maintenance - Summary
and Metrics
Comments
Estimated capital le 2020-2029
$51,000,000
City of Toronto levy only
DMAF contribution 2020-2028
$33,794,667
DMAF ends 2028
PF&R DMAF & High Lake Events
$21,000,000
contribution 2020-2025
Total funding available (2020-2029)
$105,794,667
# of existing TRCA owned erosion
211
control structures
Without DMAF estimated number
# of structures scheduled for
86
of structures repaired 2020-2029 =
maintenance 2020-2029
47 55% increase
Backlog = structures requiring
Total # of structures in backlog after 86 repair prior <2029 but no funding
2029 allocated
Valley Erosion Hazards
The Valley Erosion Hazards portfolio addresses erosion hazards and slope instability issues
impacting private and public property throughout the ravine systems of the City of Toronto. The
July 8, 2013 severe weather event was the catalyst for a funding increase to this portfolio that
prompted TRCA to extend assistance to private properties where homes have been deemed at
risk by erosion or instability. The goal of each project is to provide a cost-effective solution to
protect essential infrastructure, such as residential dwellings and municipal assets, and projects
are implemented on a priority basis to the limit of available funding each year. Landowners must
comply with TRCA's Private Landowner Contribution Policy for Erosion Control Works Policy
that requires benefiting landowners to convey land or contribute a portion of the project costs. In
2020, TRCA is planning 27 projects under the Valley Erosion Hazard portfolio and 20 of these
projects will have 40% of the project costs funded by DMAF (approximately $840,000).
Toronto Valley Erosion Hazards - Summa and Metrics
Comments
Estimated capital le 2020-2029
$32,000,000
City of Toronto levy only
DMAF contribution 2020-2028
$7,150,000
DMAF ends 2028
Total funding available 2020-2029
$10,930,920
'excludes benefiting landowner
Total funding available 2020-2029
$39,150,000
contributions
# of hazard sites being monitored
650
Without DMAF estimated
170
number of sites to be repaired
2020-2029 = 100 (59%
# of sites to be addressed 2020-2029
increase
Total # of high priority sites in backlog >
232
2029
York Region Infrastructure
The York Region Infrastructure portfolio provides long-term erosion hazard management for
Environmental Services infrastructure assets along ravines and watercourses (water and
wastewater). The portfolio includes the monitoring, study, design, maintenance and
implementation of erosion control works for infrastructure protection in TRCA's jurisdiction of
York Region. Studies and remedial works are prioritized based on a number of factors such as:
depth of cover; infrastructure type; remaining service life; consequence of failure; and current
condition of the asset. In 2020, TRCA is planning 14 projects under the York Infrastructure
portfolio and 9 of these projects will have 40% of the project costs funded by DMAF
(approximately $176,000).
York Region Infrastructure - Summaryand Metrics
Comments
Estimated capital levy 2020-2029
$9,330,000
DMAF contribution 2020-2028
$1,600,920
DMAF ends 2028
Total funding available 2020-2029
$10,930,920
# of infrastructure hazard sites being
monitored
533
Without DMAF estimated
20 number of sites to be repaired
2020-2029 = 10 (100%
# of sites to be addressed
Total # of high priority sites in backlog > 23
2029
York Region Maintenance & Other Hazards (TRCA priorities)
The York Region Maintenance & Other Hazards portfolio is for maintaining TRCA's existing
permanent erosion control assets and developing new erosion control protection on TRCA lands
within York Region. These assets are often found along ravine and valley corridors or along
natural slopes. Repairs are prioritized based on a number of factors such as: asset age;
remaining service life; proximity of permanent buildings or essential infrastructure; consequence
of failure; and current condition of the asset.
In 2020, TRCA is planning 8 projects under the York Region Maintenance & other hazards
(TRCA priorities) portfolio and 4 of these projects will have 40% of the project costs funded by
DMAF (approximately $34,000).
York Region Maintenance & Other Hazards - Summary
and Metrics
Comments
Estimated capital levy and private
$1,500,300
landowner contribution 2020-2029
DMAF contribution 2020-2028
$193,220
DMAF ends 2028
Total funding available 2020-2029
$1,693,520
# of erosion control structures and erosion
164
122 erosion control structures
hazard sites being monitored
and 42 erosion hazard sites
Without DMAF estimated
6
number of sites to be repaired
# of sites to be addressed 2020-2029
2020-2029 = 3 100% increase
Total # of high priority sites in backlog >
9
2029
Region of Peel Erosion Control & Infrastructure Protection
The Region of Peel Erosion Control and Infrastructure Protection portfolio monitors the risk to
TRCA owned erosion control structures, Region of Peel infrastructure hazard monitoring sites,
and other erosion hazards impacting public and private land. This portfolio includes the
monitoring, study, design, maintenance and implementation of erosion control works to remedy
these hazards. Mitigation measures and repairs are prioritized based on several factors such
as: depth of cover; remaining service life; infrastructure type; consequence of failure; and
current condition or exposure of the asset. Prioritization is based on the highest risk locations
which in recent years tends to be infrastructure sites.
Beginning in 2017, TRCA delineated 1,376 infrastructure hazard sites within the Region of Peel
in TRCA's jurisdiction to establish long-term monitoring sites with first inspections at most sites
being completed between 2017-2019. In addition to these infrastructure sites, TRCA currently
monitors a total of 135 erosion control structures and 50 erosion hazard sites. In 2020, TRCA is
planning 4 projects under the Region of Peel Erosion Control and Infrastructure Protection
portfolio and all 4 of these projects will have 40% of the project costs funded by DMAF
(approximately $200,000).
Region of Peel Erosion Control & Infrastructure
Protection — Summary & Metrics
Comments
Estimated capital levy (2020-
$7,000,000
2029
DMAF contribution (2020-
$1,512,000
2028
DMAF ends 2028
Total funding available
$8,512,000
2020-2029
# of existing TRCA owned
erosion control structures and
1,511
135 TRCA owned erosion control
infrastructure hazard
structures and 1,376 infrastructure
monitoring sites
hazard monitoring sites
Without DMAF estimated number of
# of sites to be addressed
18
sites to be addressed in 2020-2029 =
2020-2029
10 80% increase).
# of critical/high priority sites
80
in backlog >2029
Fee for Service Work
EP also undertakes projects for TRCA's regional and municipal partners on a fee for service
(FFS) basis to help address their priorities. These FFS projects vary in scale and complexity,
but typically involve mitigating erosion hazard risks to public safety or municipal infrastructure as
part of the design solution in natural or environmentally -sensitive areas.
In the City of Toronto, TRCA partners with the Parks, Forestry & Recreation (PF&R) and
Transportation Services divisions through a Master Service Agreement. TRCA expects to
establish similar master service level agreements with other municipalities and regions to help
establish a streamlined scoping/funding process to help deliver additional recoverable projects
while strengthening TRCA's partnerships and financial resilience.
In 2020, EP expects to undertake planning/implementation activities on 34 FFS projects with
various municipal/regional partners.
ERMP — Other strategic updates
EP staff have been working on some key updates to the ERMP to improve operational
efficiency. We have highlighted these initiatives in addition to some of the high-profile and
emergency works projects EP staff are working on in the following sections.
Property Services & Legal — ECA updates and program changes
In 2019, EP and Property and Risk Management (PRM) staff embarked on significant updates
to existing agreement templates and operating procedures to ensure contributions under
TRCA's Private Landowner Contribution for Erosion Control Works Policy were received prior to
commencing work. This will reduce liability to TRCA by ensuring that financial contributions to
projects are received and that land transfers take place in a timely manner and can be
registered on title.
EP staff, with support from PRM, will be developing a standard operating procedure for this
process later in 2020 to ensure that the necessary steps required to execute these agreements
are followed in the correct order and in a timely manner.
Toronto Water Monitoring
In 2010, the City of Toronto and TRCA developed a long-term monitoring partnership to assess
the risks to Toronto Water infrastructure in ravine and valley systems. The objective of the
program is to inspect Toronto Water infrastructure within the City of Toronto's stream valleys
and along the shoreline of Lake Ontario for the purpose of identifying Toronto Water
infrastructure that is at risk or has been damaged due to erosion before a complete failure
occurs. The program reduces environmental and public health and safety risks and allows
Toronto Water staff to effectively and efficiently plan, prioritize and budget for asset
maintenance, improvement, replacement and protection.
In 2020, TRCA staff anticipate that approximately 2,500 assets will be inspected due to the
program growth requested by Toronto Water (doubling of field staff). TRCA staff inspected a
total of 1,121 assets in 2019.
Post -storm monitoring / Incident Management System (IMS) - Erosion Risk Management
2019 was the first operational year of the IMS for Erosion Risk Management that was developed
to follow a similar methodology as the TRCA Flood Risk IMS. The EP team decided to follow
this model to coordinate response efforts in preparation for the potential of another significant
erosion event like the July 8, 2013 storm. Utilizing the IMS in 2019, EP staff monitored 14 storm
events, 4 high -wave warnings, and 4 months of high lake levels. Field crews were deployed to
priority areas and findings were shared with municipal partners, impacted stakeholders, and
other TRCA departments. TRCA has developed a Flood Risk Analysis Network tool named
FRANk-to schedule 45 site inspections at TRCA owned erosion control structures within the
impacted ravine systems. In previous years, EP staff would attempt to inspect every TRCA
owned structure regardless of whether it had been impacted by a significant weather event. This
change in approach for 2019 resulted in 640 less inspections at a cost savings of approximately
$28,000. These savings were leveraged to establish testing sites for Remotely Piloted Aircraft
(RPA) inspections, a technology that will be increasingly utilized in the future.
Ajurisdiction-wide storm event on January 11th, 2020, which activated the EP's IMS system
prompting staff to coordinate inspections and respond to erosion reports from the Flood Risk
Management (FRM) group's Emergency Operations Centre (EOC). Field crews were deployed
immediately and had inspected 54 sites across the jurisdiction from Etobicoke to the Rouge
watersheds and north of Kleinburg to the Scarborough Bluffs shoreline in the first week. EP staff
provided inspections summaries to other TRCA staff to ensure the Flood Duty Officers and
relevant staff were informed of preliminary findings and next steps.
Yellow Creek (Vale of Avoca)
Due to risks to public health and safety, as well as essential infrastructure, TRCA declared
emergency works for a 90 -metre section of Yellow Creek below Summerhill Gardens in the Vale
of Avoca ravine on July 31, 2019. The goal of this project is to remove the exposed stone and
mortar retaining wall and to realign the channel away from the slope. This work will help reduce
the risk of future slope failures in this area. In addition, TRCA is building erosion control
structures within the creek and is restoring a section of trail along the west bank that was lost
due to erosion. Construction was initiated on August 29, 2019 and is anticipated to be
completed in Spring of 2020. Photos captured during construction can be found in Attachment
3.
High Lake Events and Toronto Islands
The 2017 high lake level event resulted in flooding and erosion damage along the length of the
City of Toronto shoreline from Marie Curtis Park in the west to Rouge Beach Park in the east.
TRCA and City of Toronto staff collaborated to mitigate, document, catalogue, inspect and
assess this damage. With the lake still above average spring levels, the City of Toronto was
impacted by the ice and windstorm of April 14-15, 2018 which further exacerbated the shoreline
damage. City of Toronto and TRCA staff coordinated efforts to assess the damage. High lake
levels in 2019 contributed to further flooding, erosion, and damage to the Toronto shoreline
resulting in a total of over $30 million in estimated damages to City and TRCA property and
assets since 2017.
Since these major events, TRCA and City of Toronto staff have been implementing emergency
needs works and prioritizing and planning all other identified immediate and short-term needs
projects across the entire waterfront. While the impacts of the high lake level events have been
felt along the entire length of Toronto's waterfront, the floods in both 2017 and 2019
disproportionally affected Toronto Island Park where over 800 residents, many businesses, and
two schools were directly affected.
In anticipation of 2020 flooding, TRCA has initiated the Class Environmental Assessment for
Remedial Flood and Erosion Control Projects (Class EA) process by issuing an emergency
declaration to the Ministry of Environment, Conservation and Parks and Conservation Ontario.
TRCA with the support of the City is raising park roads and implementing flood mitigation
structures at key points on the Island in order to maintain emergency service access across the
Island, protect park infrastructure, preserve the user experience, and reduce potential Island
revenue loss. Additional information can be found in the declaration which is viewable as
Attachment 4.
Following emergency work implementation, TRCA has committed to helping the City of Toronto
continue the Class EA process and determine a long-term mitigation solution for the remainder
of the Island. This work will be integrated with the Toronto Island Park Master Plan initiative and
may involve elevating additional low-lying roads, implementing shoreline berms, raising the
elevation of existing shoreline structures and/or directing water to pumping systems.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 7 — Build New Partnerships and Business Models
Report prepared by: Ashour Rehana, extension 5524
Emails: ashour.rehana(&trca.ca
For Information contact: Matt Johnston, extension 5525
Emails: matthew.iohnston(&trca.ca
Date: February 25, 2020
Attachments: 4
Attachment 1: Table of projects being planned under the ERMP in 2020
Attachment 2: Map of projects being planned under the ERMP in 2020
Attachment 3: Photographs of various projects being planned under the ERMP in 2020
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works
Declaration
Attachment 1: Table of projects being planned under the ERMP in 2020
IMoiddipality
Ward
Project Name
Portfolio
2020 Project Status
City of Markham
1
German Mills Settlers Park Sites 2-3 Sanitary Infrastructure Protection
York Region Infrastructure
Study, Planning or Design
City of Markham
5
Locust Hill Drainage Improvements Study
Fee For Service
Pre -Planning
City of Mississauga
5
Brandon Gate Park- Bank Stabilization Project
Region of Peel Erosion Control & Infrastructure Protection
Study, Planning or Design
City of Mississauga
5
Derry Greenway Sanitary Infrastructure Protection Project
Region of Peel Erosion Control & Infrastructure Protection
Study, Planning or Design
City of Pickering
1
Bruce Handscomb Park Trail Rehabilitation
Fee For Service
Pre -Planning
City of Richmond Hill
5
Patterson Valley South Richvale Erosion Hazards
Fee For Service
Construction
City of Richmond Hill
5
Patterson Creek 1-066,1-067,1-065,1-064, P-102
York Region Infrastructure
Post -Construction
City of Richmond Hill
5
Patterson Creek near Grist Mill Park Sanitary Infrastructure Protection
York Region Infrastructure
Construction
City of Richmond Hill
S
Patterson Creek near Richvale Athletic Centre Sanitary Infrastructure Protection
York Region Infrastructure
Construction
City of Toronto
1
Lakeland Drive Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
1
22-24 Bucksburn Road Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
1
Hadrian Drive Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
1
Norfield Crescent Minor Works
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
1
Shendal a Drive Slope Sta b I ization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
2
Mimico Creek behind l Lane Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
3
Humber Bay Park East Major Maintenance Project
Fee For Service
Study, Planning or Design
City of Toronto
3
Humber Bay Park West Boat Launch Repair
Fee For Service
Study, Planning or Design
City of Toronto
3
Humber Bay Park West Major Maintenance Project (WF31.03, 11.04, 11.05, 11.07)
Fee For Service
Study, Planning or Design
City of Toronto
3
Palace Pier Court Headland Maintenance Project
Fee For Service
Construction
City of Toronto
3
Areal - Mimico Creek (MCO1.1, MCO1.2, MC03) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
3
Area 2 - Humber River (HR81.1) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
3
Beaucourt Road Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
3
Etobicoke Valley Park Major Maintenance Project
Toronto Ravine Major Maintenance
Post -Construction
City of Toronto
3
Home Smith Park Road Weir(FCC16.03) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
3
Royal York Road (MC06) Minor Maintenance Project
Toronto Ravine Major Maintenance
Construction
City of Toronto
3
Humber Bay Park West Major Maintenance Project (WF11.01, 11.02, 11.06, 11.08, 11.09)
Toronto Waterfront Major Maintenance
Study, Planning or Design
City of Toronto
3
Long Branch Park Major Maintenance Project
Toronto Waterfront Major Maintenance
Construction
City of Toronto
3
Prince of Wales Park Major Maintenance Project
Toronto Waterfront Major Maintenance
Study, Planning or Design
City of Toronto
3
Ridgegate Crescent Erosion Control Project
Valley Erosion Hazards
Construction
City of Toronto
4
Sunnyside Park Revetment Maintenance Project
Fee For Service
Construction
City of Toronto
5
Gaffney Park Erosion Control Project (13-59 Terry Drive)
Fee For Service
Study, Planning or Design
City of Toronto
5
Denison Road U Aper S lope Stabil ization Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
5
Bexley Crescent Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
5
Ridge Point Crescent Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
6
Canyon Avenue(DR75.1) Major Maintenance Project
Toronto Ravine Major Maintenance
Pre -Planning
City of Toronto
6
Gwendolen Crescent Major Maintenance Project
Toronto Ravine Major Maintenance
Post -Construction
City of Toronto
6
Black Creek Tribuatry behind Appletree Court and Seeley Drive Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
6
Eldorado Court Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
6
Peacham Crescent Slope Stabilization
Valley Erasion Hazards
Construction
City of Toronto
7
Archway Crescent(HR27.1,27.2) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
7
Azalea Court Slope Stabilization Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
7
25-31 Gravenh u rst Avenue Minor Works
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
7
96-106 Wirich Ill Crescent Slope Stability and Erosion Risk Assessment
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
7
Topcliff Avenue Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
10
Toronto Island Park Flood and Mitigation Project
Fee For Service
Study, Planning or Design
City of Toronto
10
Toronto Island Park Restaurant
Fee For Service
Study, Planning or Design
City of Toronto
11
Mud Creek Restoration - Reach 3
Fee For Service
Study, Planning or Design
City of Toronto
11
30-36 Rose Park Crescent Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
11
Hudson Drive Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
11
Yellow Creek near Heath Street East Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
Attachment 1: Table of projects being planned under the ERMP in 2020
Municipality
Ward
Project Name
Portfolio
2020 Project Status
City of Toronto
12
72 Heath Street East Slope Stability and Erosion Risk Assessment
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
14
Riverdale Park East Slope Regrading Project
Fee For Service
Post -Construction
City of Toronto
14
Tommy Thompson Park- East Shore and Peninsula D Restoration Project
Fee For Service
Study, Planning or Design
City of Toronto
14
Area 3 -Don River(DR90) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
15
Leslie Street Culvert and Drainage Channel Stabilization Project
Fee For Service
Study, Planning or Design
City of Toronto
15
Wil ket Creek Rehabilitation Project- Reach 3
Fee For Service
Pre -Planning
City of Toronto
15
Alderbrook Drive Slope Stabilization Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
15
Woodsworth Road (DR70) Minor Maintenance Project
Toronto Ravine Major Maintenance
Construction
City of Toronto
15
Roslin Avenue Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
16
Bartley Drive Erosion Control and Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
17
Newtonbrook Creek Bridge Replacement Project
Fee For Service
Study, Planning or Design
City of Toronto
17
Burbank Drive Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
17
East Don River behind Clarinda Drive Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
19
305 Dawes Road Project
Fee For Service
Study, Planning or Design
City of Toronto
19
Ashbridges Bay Landform Project
Fee For Service
Construction
City of Toronto
19
Ashbridges Bay Park Major Maintenance Project
Fee For Service
Construction
City of Toronto
19
Coatsworth Cut Maintenance Dredging
Fee For Service
Construction
City of Toronto
19
Taylor Creek Park Bridge 2 Protection Project
Fee For Service
Study, Planning or Design
City of Toronto
19
East Don River behind 30 Northline Road Erosion Control and Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
20
Bluffer's Park Beach(WF22.03) Major Maintenance Project
Fee For Service
Study, Planning or Design
City of Toronto
20
Bluffer's Park Entrance Channel Maintenance Dredging
Fee For Service
Construction
City of Toronto
20
Bluffer's Park South Headland and Beach Major Maintenance Project - Phase l I(Headland WF22.04)
Fee For Service
Construction
City of Toronto
20
Bluffer's Park South Headland and Beach Major Maintenance Project- Phase III (Beach WF22.05)
Fee For Service
Construction
City of Toronto
20
Bluffer's Park Southwest Headland Emergency Works
Toronto Waterfront Major Maintenance
Construction
City of Toronto
20
Bluff's Landslide Cleanup
Toronto Waterfront Major Maintenance
Construction
City of Toronto
20
Fishleigh Drive Erosion Control Project
Toronto Waterfront Major Maintenance
Post -Construction
City of Toronto
20
90 Meadowcliffe Drive Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
21
St. Andrews Cemetery Slope Stabilization
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
24
Upper Highland Creek Pan Am Path Connection Project (Phase 1)
Fee For Service
Construction
City of Toronto
24
Area 4- Highland Creek (HC19) Major Maintenance Project
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
25
University of Toronto Scarborough Campus (UTSC) Area B Bank Stabilization Project
Fee For Service
Study, Planning or Design
City of Toronto
25
Port Union Waterfront Park Major Maintenance Project
Toronto Waterfront Major Maintenance
Study, Planning or Design
City of Toronto
25
Greyabbey Ravine Slope Stabilization Project
Valley Erosion Hazards
Study, Planning or Design
City of Toronto
15 & 11 Mud Creek Restoration - Reach 6
Fee For Service
Construction
City of Toronto
15 & 16 E.T. Seton Park Major Maintenance
Toronto Ravine Major Maintenance
Study, Planning or Design
City of Toronto
Various 2019 Slope Stability and Erosion Risk Assessments
Valley Erosion Hazards
Study, Planning or Design
City of Vaughan
2
111 Longview Crescent Slope Stabilization
Fee For Service
Construction
City of Va ugh an
2
Humber Pumping Station Emergency Outfall Maintenance
York Region Infrastructure
Construction
City of Vaughan
2
Humber River P004/P005 Sanitary Infrastructure Protection Project
York Region Infrastructure
Study, Planning or Design
City of Vaughan
2
Rainbow Creek Decommisioned Sewer Protection and Abatement
York Region Infrastructure
Study, Planning or Design
City of Vaughan
2
Boyd Bridge Crossing Replacement
York Region Maintenance & Other Hazards
Post -Construction
City of Vaughan
2
Granger Greenway EM5706 Bank Stabilization
York Region Maintenance & Other Hazards
Pre -Planning
City of Vaughan
2
Granger Greenway EM5789 Major Maintenance
York Region Maintenance & Other Hazards
Study, Planning or Design
City of Vaughan
2
Granger Greenway HR72.1 Major Maintenance
York Region Maintenance & Other Hazards
Study, Planning or Design
City of Vaughan
2
Legion Court Road Bank Stabilization
York Region Maintenance & Other Hazards
Study, Planning or Design
City of Vaughan
4
2 and 6 Cherry Hills Road Slope Stabilization
Fee For Service
Pre -Planning
City of Vaughan
4
West Don River near Langstaff Park Sanitary Infrastructure Protection
York Region Infrastructure
Post -Construction
City of Vaughan
4
70 Main Street South Slope Stabilization
York Region Maintenance & Other Hazards
Construction
City of Vaughan
5
Yonge Street Flume Minor Maintenance
York Region Infrastructure
Construction
Town of Ajax
1
Ajax Bridge 104 Maintenance
Fee For Service
Pre -Planning
Attachment 1: Table of projects being planned under the ERMP in 2020
Municipality
Ward
Project Name
Portfolio
2020 Project Stirtus
Town of Ajax
1
Ajax Trans Canada Trail Bridge 3003 Emergency Works and Bank Stabilization
Fee For Service
Pre -Planning
Town of Ajax
3
Ajax Trans Canada Trail near Church Street Rehabilitation
Fee For Service
Pre -Planning
Town of Caledon
5
Bolton Sanitary Infrastructure Protection Project
Region of Peel Erosion Control & Infrastructure Protection
Construction
Township of King
2
5885 King Road Drainage Improvements
York Region Maintenance & Other Hazards
Construction
Attachment 2: Map of projects being planned under the ERMP in 2020
— - — - — - — - — - —
� I I
I I
i I I I
I I i 1 1 1
i 1
I 1
_-_--- -_-_-__-L I '_-----------
1
I i1
1 1
1U,
1 d t
11 � 40011
1 * f
1
r
1 404
I �*
*
409
* *
40]
\
0EW
\
\
Legend
*
Toronto and Region
Conservation
Authority
If
E3
PEEL
Lake Ontario
�Xx a.mno
Attachment 3: Photographs of various projects being planned under the ERMP in 2020
Toronto Ravine Major Maintenance
I
Figure 1. Eroding bank at failed TRCA erosion control asset along the main branch of the Don River, City of Toronto.
Toronto Waterfront Major Maintenance
Figure 2. Eroded headland structure in Bluffers Park, City of Toronto.
oll
mal;
-!RIP
Ft
:11111�- 1 `4
I
it
r
:11111�- 1 `4
I
Attachment 3: Photographs of various projects being planned under the ERMP in 2020
York Region Maintenance & Other Hazards (TRCA Priorities)
Figure 5. Eroding bank and trail in Boyd Conservation Area, City of Vaughan.
Region of Peel Erosion Control & Infrastructure Protection
,K
R_
�
r•
a,{4
.Pi�
I kKj
Figure 6. Exposed sanitary sewer (circled) at Region of Peel Infrastructure Site P-315.
Attachment 3: Photographs of various projects being planned under the ERMP in 2020
Toronto Water Monitoring
Figure 7. Exposed manhole chamber along Black Creek, City of Toronto.
Recoverable Projects
Figure 8. Eroding bank and trail along Newtonbrook Creek, City of Toronto.
Attachment 3: Photographs of various projects being planned under the ERMP in 2020
Yellow Creek / Vale of Avoca
Figure 9. Active construction at the Yellow Creek Emergency Works Site, City of Toronto.
Figure 10. Active construction at the Yellow Creek Emergency Works Site, City of Toronto.
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works Declaration
Toronto and Region
Conservation
Authority
Toronto Island Park Flood and Erosion Mitigation Project -
Emergency Works Declaration
To: MECP Central Region Office, Ministry of Environment, Conservation and Parks
Leslie Rich, Conservation Ontario
From: Jet Taylor, Senior Project Manager, Engineering Projects
Date: February 19, 2020
Toronto and Region Conservation Authority (TRCA) is preparing to undertake emergency flood and
erosion control works within Toronto Island Park resulting from the 2017 and 2019 record Lake Ontario
high-water events and associated flooding. Based on these events, coupled with flood mapping
prepared by TRCA and Baird Engineering, 300 metres (m) of road along Lakeshore Avenue and 200 m
of road along Cibola Avenue have been identified as requiring immediate raising in order to allow
emergency service and operations vehicles to access the water treatment facility and Island resident
community. 2019 flooding at the Island emergency service station is shown below in Figure 1.
Figure 1. Flooding along Cibola Avenue at EMS Station 48. City of Toronto, 2019.
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works Declaration
Further, shoreline protection along Algonquin Island and Wards Island is inadequate with significant
wave overtopping resulting in community road and dwelling flooding and health and safety concerns as
shown in Figure 2.
Figure 2. Flooding along Algonquin Island. City of Toronto, 2019.
In the spring of 2017, snowmelt in combination with significant rainfall resulted in an unprecedented rise
in the water levels of Lake Ontario. Lake levels reached their peak height on May 27, 2017 with a
recorded elevation of 75.93 m IGLD (International Great Lakes Datum), the highest water level ever
recorded. The flooding event impacted the entirety of Toronto's Waterfront, especially Toronto Island
Park.
The flood significantly affected Toronto Island Park with over 800 residents, many businesses, and two
schools directly impacted. Both City of Toronto and TRCA staff worked to prevent damage and the loss
of property and assets through emergency flood mitigation efforts including deployment of 45,000
sandbags, 1000 meter bags, and over a dozen industrial pumps.
Despite these efforts, Toronto Island Park was closed for 88 days between May 4 and July 30, 2017
due to the flooding. The closure during peak season presented a major disruption in tourist and
recreational activity which is an important source of revenue to the City and local businesses. The
island parks also experienced significant shoreline erosion, damage, and debris accumulation over the
spring and summer of 2017.
In 2018, TRCA retained Baird & Associates (Baird) to provide coastal engineering services to complete
a study to assist in planning for and responding to future flood conditions. The study consisted of the
following four major components: i) Flood Characterization Report, ii) Flood Risk Assessment, iii) Flood
Mapping, and iv) Flood Mitigation Alternatives Report.
The City of Toronto, TRCA, and Baird held a meeting in December 2018 to identify the leading
mitigation alternatives for the areas most affected by the 2017 flood, with consideration for the
Toronto and Region Conservation Authority 1 2
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works Declaration
recommendations made by Toronto Island residents. The alternatives included protecting low-lying
residential areas with a berm or dyke structure, elevating low-lying roads, increasing the crest elevation
of shore protection structures, and directing surface drainage to existing sumps. These alternatives
were developed using the 500 -year stillwater level for Toronto (static lake level plus storm surge) as the
design water level.
In the spring of 2019, Lake Ontario experienced unprecedented water levels which surpassed the
previous 2017 record by ten centimeters. Lessons learned from 2017, along with proactive mitigation
measures implemented in 2018, effectively reduced the impact of flooding in 2019. Strategically placed
short-term measures helped reduce the impact of the 2019 high lake level event; however, key areas
were identified that require long-term flood protection. TRCA has committed to helping the City of
Toronto with the development of a long-term solution through the Class Environmental Assessment for
Remedial Flood and Erosion Control Projects (Class EA) process, and intended to initiate this process
in early 2020 pending confirmation of available funding; however given the persistent elevated water
levels in Lake Ontario, it is TRCA's declaration that critical elements of this long-term protection be
carried out forthwith in response to an emergency and it is in the interests of public health and safety
and environmental and property protection. The critical works will be undertaken in accordance with
Section 9.0 — Emergency Measures of the Class EA, with the remainder of works following the standard
Class EA process.
The scope of emergency works includes a geotechnical investigation and detailed design to advise
subsequent construction to raise approximately 300 m of road along Lakeshore Avenue, 200 m of road
along Cibola Avenue, 370 m of flood protection along the north shore of Algonquin Island and 300 m of
flood protection along the north shore of Wards Island. A location map has been attached to this notice
that shows the emergency works areas.
TRCA will access the Island via barge and will utilize existing park roads for access. Emergency
services staff will be made aware of road works and access past the construction area will be made
available. TRCA intends to mobilize as early as February 20, 2020 for subsurface investigations with
construction scheduled to begin in March, 2020. To ensure public safety, formal and informal trails
along work areas and the construction access route will be closed until the emergency works have
been completed.
TRCA's public, government and stakeholder communication strategy involves a meeting with the City
Councillor and Island residents (currently scheduled for February 23, 2020), Notice of Project
Commencement letter issuance to stakeholders, signage, and maintaining an active website with
project updates.
Following completion of the emergency works, TRCA will submit a written report within 14 working days
documenting the location and nature of the emergency; the physical, biological, socioeconomic and/or
cultural effects of the emergency; actions taken to resolve the emergency; effectiveness of the actions
taken; and anticipated future remedial works.
For more information, please contact the undersigned at 416-661-6600 Ext. 5526 or iet.tavlor(a)trca.ca
Sincerely,
P Y
Jet Taylor,
Toronto and Region Conservation Authority 1 3
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works Declaration
Senior Project Manager, Engineering Projects
Restoration and Infrastructure
Toronto and Region Conservation Authority 1 4
Attachment 4: Toronto Island Park Flood and Erosion Mitigation Project — Emergency Works Declaration
Toronto Islands
Lakeshore Ave. Permanent
Road Repair
Length: 300 in
Cibola Ave. Permanent
Road Repair
Length: 200 in
Ward's Island Beach Curb
— East shoreline
= West Shoreline
Algonquin Island
Flood Protection
Length 370 in
Date: 2/14/1010
Created It, ae4aratlon & aesw2e Management
DrtM1ophato: Fleat sale SOWtlan; 11018)
Lake Ontario
�X Toronto and Region
Conservation
Authority
Mgainer me data used m create hit man e+ as method from a sarlery of-a—s& date,. The TRCA takes no mspati4 y mr errors or omisslons in the data and ratan: the ought W make changes 8i correction at amname—,,—imu- rm wnr.e. omni mento
about the data on this map, please enact the TRCA Resmranen and infrastructure Masion, 1416166155W.
RES.#A42/20 - NORTHWEST GREATER TORONTO AREA (GTA) TRANSMISSION
CORRIDOR IDENTIFICATION STUDY
To provide information on the Ministry of Energy, Northern Development
and Mines (ENDM) and the Independent Electricity System Operator's
(IESO) Northwest Greater Toronto Area (GTA) Transmission Corridor
Identification Study.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS on January 24, 2020 Toronto and Region Conservation Authority (TRCA) staff
advised TRCA Board of Directors that the Ministry of Energy, Northern Development and
Mines (ENDM) together with the Province's electricity system planner, the Independent
Electricity System Operator (IESO), had initiated the Northwest Greater Toronto Area
(GTA) Transmission Corridor Identification Study to protect lands for future transmission
infrastructure;
WHEREAS the general study area for the Northwest GTA Transmission Corridor largely
corresponds to the Ministry of Transportation's (MTO) narrowed 2019 Focused Analysis
Area (FAA) for the GTA West Transportation Corridor Route Planning and Environmental
Assessment (EA) Study;
WHEREAS the Province is seeking feedback on the narrowed study area and guiding
principles in conducting the transmission study through Environmental Registry of
Ontario (ERO) Posting #019-1503 by May 7, 2020;
AND WHEREAS the Province is seeking feedback on early access to land for
environmental studies on transmission projects through ERO Posting #019-1371 by April
30, 2020;
IT IS RECOMMENDED THAT this staff report and preliminary comments on the ERO
postings be received by the Board of Directors for information.
CARRIED
BACKGROUND
In June 2019, ENDM and the Province's electricity system planner, IESO, initiated the
Northwest GTA Transmission Corridor Identification Study in order to identify and protect a
transmission corridor to support growing demand for electricity in the western GTA, should the
need arise. The starting point for the Northwest GTA Transmission Corridor Identification Study
was MTO's 2015 FAA.
On January 24, 2020, staff reported to the TRCA Board of Directors Meeting #11/19,
highlighting TRCA concerns and recommendations based on available materials associated
with MTO's GTA West Transportation Corridor Route Planning and EA Study (hereafter "GTA
West Highway EA"). Amended Resolution #A233/19 along with the full Board report is
available on the TRCA website. While the focus of the report was the GTA West Highway EA,
staff also identified ENDM and IESO's transmission corridor study, due to the potential for
cumulative impacts that these parallel infrastructure corridors could have related to TRCA
interests.
Given that these parallel studies are tied to the outcome of one another, several provisions of
the Resolution and Recommendations made in the Board of Directors report also apply to the
new transmission corridor including, but not limited to:
Excerpt from Resolution #A233/19
THAT TRCA staff continue to work with MTO staff and municipal partners through the
Regulatory Agency Advisory Group, through the Greenbelt Transportation Advisory
Group, and through an established working group with TRCA, other affected
conservation authorities, municipalities and provincial and federal ministries, to address
concerns related to potential alignment changes to the technically preferred route to
accommodate development and community interests, as well as concerns related to the
preferred design alternatives, including concerns related but not limited to: watercourse
and wildlife crossings and trail connections, flood and erosion control, stormwater
management, vegetation removals, natural heritage restoration and compensation, land
acquisition and archaeology, and climate resiliency;
THAT the 32 Recommendations contained within this report and in Appendix 1 to this
report be approved for review by MTO;
Recommendation:
2. MTO and ENDM/IESO confirm efforts to coordinate their independent studies and
ensure negative impacts are fully assessed and minimized wherever practicable.
ENVIRONMENTAL REGISTRY OF ONTARIO (ERO) POSTING #019-1503
On March 23, 2020, ENDM posted a proposal on the ERO seeking feedback by May 7, 2020
on a proposed narrowed study area (Attachment 1), and the guiding principles regarding the
Northwest GTA Transmission Corridor Identification Study. The outcome of the ENDM/IESO
study will be a recommendation regarding land to be preserved for future transmission
infrastructure and protected from development or other purposes. Any future electricity
transmission development in the area would be subject to EA Act requirements and other
applicable regulatory approvals, including those through the Ontario Energy Board (OEB). While
the Northwest GTA Transmission Corridor Identification Study is underway, the study area is
subject to protection under the policies in the Provincial Policy Statement (PPS), 2020 (in effect
on May 1, 2020) and A Place to Grow: Growth Plan for the Greater Golden Horseshoe.
This ERO posting poses two questions:
Are you aware of potential barriers or issues that may be associated with the proposed
narrowed area of interest?
• Are there other principles we should consider in conducting the study?
A detailed response to the ERO posting will be prepared by TRCA staff under separate cover.
However, our preliminary comments largely align with staff's comments on the GTA West
Highway EA and are provided below.
Narrowed Study Area
As illustrated, the proposed transmission corridor will generally be located within MTO's
narrowed 2019 FAA. Although impacts associated with a transmission corridor will be different
from those for a new highway, given the location of the narrowed area of interest, many of the
concerns identified in the January 24, 2020 Board of Directors report will apply.
It will be imperative that the transmission corridor and associated infrastructure be sited to avoid
risks to property, as a result of flood and erosion hazards scattered throughout the FAA. Not
only should infrastructure be located outside of natural hazards areas, but often times
associated works result in significant impacts to valley systems, including the potential to impact
valley slopes and exacerbate erosion issues. Natural hazards associated with flooding and
erosion will need to be considered within the ENDM planning process and risks properly
managed in any subsequent EAs. It is anticipated that TRCA will continue to be engaged
throughout this planning process to ensure close coordination as the location of the
transmission corridor is further refined.
Proposed Guiding Principles
Through the ERO posting, ENDM is seeking feedback on the following guiding principles. The
principles are described as being informed by provincial legislation, policies and technical
planning documents to support the identification of a future corridor:
1. Co -locate with other linear infrastructure.
2. Plan for the most cost-effective outcome.
3. Minimize impacts to natural heritage, agricultural and hydrological features consistent
with provincial policies.
4. Minimize impacts on built up areas.
5. Provide flexibility for the future.
1. Co -locate with other linear infrastructure
The PPS supports the co -location of linear infrastructure, where appropriate, to potentially
mitigate impacts to surrounding agricultural land and environmentally sensitive areas.
ENDM has identified that since planning is underway for MTO's GTA West Highway EA, that
this offers an opportunity to consider co -location with the transmission study. It is important
to note, however, that these studies are independent of one another and will proceed
through two separate processes.
While TRCA staff generally supports co -location of infrastructure, staff is also concerned
with the potential cumulative impacts that these two infrastructure projects will have on the
natural heritage system (NHS). TRCA staff are available to work with both proponents to
minimize these impacts, wherever practicable.
2. Plan for the most cost-effective outcome
TRCA is supportive of corridor route planning that minimizes costs, to the extent feasible.
However, factors such as identifying the shortest geographic route for instance may not
achieve desired results considering necessary connection points, and challenges with
alignments through sensitive or possibly difficult to construct areas. It is anticipated that a
fulsome analysis that considers a range of factors will determine the most cost-efficient
outcome.
3. Minimize impacts to natural heritage, agricultural and hydrological features
consistent with provincial policies
Development pressures within TRCA's jurisdiction are resulting in added stressors to the
few remaining natural systems within our jurisdiction, and it will be extremely important to
ensure that impacts to the form and function of those natural corridors are avoided, to the
extent possible. It is expected that construction of anew transmission corridor will result in
significant vegetation and forest removals, with limited opportunity to replace lost habitat due
to vegetation management requirements along these types of corridors. Furthermore, new
transmission infrastructure has the potential to result in the removal of sensitive
watercourses and wetlands, often with associated impacts to valley systems.
The alignment and design of the transmission corridor will need to consider the numerous
valley and stream crossings within the study area and associated natural hazards (flood and
erosion hazards). As such, the principle of avoiding flood and erosion hazards should also
be included.
4. Minimize impacts on built up areas
As identified in the January 24, 2020 Board of Directors report, TRCA has worked closely
with municipalities and the development industry over the past several years to protect
significant natural features through municipal planning processes, and to convey lands into
public ownership. It will be imperative that those negotiations and agreements be
considered through this process.
5. Provide flexibility for the future
It is expected that the impacts of a new transmission corridor will result in significant losses
to the NHS including unavoidable impacts to forest and wetland communities, with limited
opportunity to restore the corridor to its full extent after construction. As restoration efforts
within a transmission corridor may not be able to fully re-establish lost features and
functions, habitat losses will need to be considered and compensated for to the extent
possible. This also provides a unique opportunity, similar to that of The Meadoway project,
to enhance biodiversity by maximizing naturalization and restoration efforts within the
corridor, and by providing trail linkages along with new active transportation uses, subject to
regulations/requirements within the corridor.
ERO POSTING #019-1371
On a related note, on March 2, 2020, ENDM posted a proposal on the(ERO) to give the OEB
the authority to grant, under specific circumstances, earlier access to land to electricity
transmission project proponents for the purpose of conducting preliminary environmental
studies, prior to applying for Leave to Construct. It is anticipated that access to TRCA lands will
be required to conduct these studies in multiple locations.
Correspondence was sent earlier this year by TRCA field staff requesting permission to enter
private lands to complete annual terrestrial biological inventories across the region, including
along the MTO alignment alternatives within the FAA. It is our understanding that MTO
consultants have requested similar permissions to enter lands for investigations within the same
general area.
Given that the MTO 2019 FAA is generally the same for the proposed transmission narrowed
area of interest, it is recommended that efforts be coordinated among all agencies to avoid
duplication of effort and delays, and that TRCA field staff also be given early access to lands to
complete necessary investigations, as needed. Close coordination with TRCA archaeology
staff will also be necessary to complete investigations on TRCA lands for any required ground
disturbances.
A detailed response to this ERO posting will be prepared by TRCA staff under separate cover
and submitted by the closing date of April 30, 2020.
NEXT STEPS
TRCA's response to ERO #019-1503 posting will provide requested feedback on the guiding
principles and potential barriers or issues that may be associated with the proposed narrowed
area of interest. The ENDM and IESO are proposing to align the timing of their study with
milestones related to MTO's GTA West Highway EA. However, because MTO has yet to
confirm a preferred route, it is unclear at this time where exactly the final alignment of the
highway will be located, and ultimately how the new transmission corridor will align with the
location of the highway. Staff will advise of this concern in its comments through the ERO
process.
It is anticipated that the cumulative effects of these two large infrastructure projects will result in
extensive and widespread impacts within the Etobicoke Creek and Humber River Watersheds.
As is standard practice, TRCA staff will support access to TRCA lands for the required
environmental studies to be completed and will provide advice as to our standard requirements
for this process. Additionally, staff will continue to report back to the Board of Directors on this
project, as well as the GTA West Highway EA at key milestones.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built
environment
Strategy 7 — Build partnerships and new business models
Strategy 8 — Gather and share the best sustainability knowledge
Strategy 12 — Facilitate a region -wide approach to sustainability
FINANCIAL DETAILS
National Energy Board (NEB) and OEB Applications are a matter of exclusive federal or
provincial jurisdiction, respectively, with the OEB itself being responsible for all decisions. While
there are no provisions that would allow TRCA to charge review fees for participation in an NEB
or OEB process, if conditions for NEB or OEB approval specifically require TRCA involvement,
appropriate fees will be negotiated on a project -specific basis. Should this project move to an
EA, the appropriate review fee will be charged.
DETAILS OF WORK TO BE DONE
TRCA staff will provide formal responses through the provincial ERO postings. Relevant
recommendations from the GTA West Highway EA will inform these responses.
TRCA staff will continue to work with and provide feedback to ENDM and IESO as new
information is received and will report back to the TRCA Board of Directors once further
information becomes available.
Report prepared by: Sharon Lingertat, extension 5717
Emails: sharon.lingertatna.trca.ca
For Information contact: Sharon Lingertat, extension 5717
Emails: sharon.lingertatCatrca.ca
Date: April 1, 2020
Attachments: 1
Attachment 1: Proposed Transmission Narrowed Area of Interest versus MTO Focused Analysis
Area
Proposed Transmission Narrowed Area of Interest Versus MTO Focused Analysis Area
'I
m
TOWN Street w
OF HALTO m 03
o
HILLS �
River Drive
17 Sideroad �t
15 Sideroad
HALTON
10 Sideroad
v
C
J
r
m
Steeles Aver ue.f
II
0
M
TOWN OF
MILTON
0 2.5 5 km J4071
1
II
O
Olde Baseline Road
m
Road 0 410
c
r
cm
PEE
� 11
M
m
0
Drive
II
0
E
72
12
II
Y
0
0
EL
King Street
Countryside Drive
o p
v
Quee,,
Derry'?
Britannia Road II
CITY OF
MISSISSAUGA 401
Eglinton Avenue
I
19 oN F
W
50
427 aLe'�e
CITY OF
0�_, TORONTO
4R �.
TOWNS
OF K11
CITY OF
VAUGHAN
r�aQ/r
e
71�e
�e
ROaa `ee� 4101
e
400 ,
0 Electrical Transmission Station
' Proposed Transmission Narrowed Area of Interest
MTO 2010 Focused Analysis Area
o ams
Parkway
o
CITY OF II
CL
R°aa
BRAMPTON
w
v
E
i
�
7r,
S
//,II
0
M
m
0
Drive
II
0
E
72
12
II
Y
0
0
EL
King Street
Countryside Drive
o p
v
Quee,,
Derry'?
Britannia Road II
CITY OF
MISSISSAUGA 401
Eglinton Avenue
I
19 oN F
W
50
427 aLe'�e
CITY OF
0�_, TORONTO
4R �.
TOWNS
OF K11
CITY OF
VAUGHAN
r�aQ/r
e
71�e
�e
ROaa `ee� 4101
e
400 ,
0 Electrical Transmission Station
' Proposed Transmission Narrowed Area of Interest
MTO 2010 Focused Analysis Area
RES.#A43/20 - SUMMARY OF 2020 TRCA POLICY CONSULTATION SUBMISSIONS
AND RECENT PROVINCIAL POLICY INITITATIVES
Summary of Toronto and Region Conservation Authority (TRCA) policy
consultation submissions on federal and provincial initiatives to date in
2020, and a summary of other recent policy initiatives relevant to TRCA
interests, for the information of TRCA Board of Directors.
Moved by: Paul Ainslie
Seconded by: Ronald Chopowick
WHEREAS to date in 2020, the Province of Ontario has posted several legislative,
regulatory and policy initiatives on the Environmental Registry of Ontario (ERO) relevant
to Toronto and Region Conservation Authority's (TRCA) interests;
WHEREAS the federal government requests comments on federal policy initiatives and
technical guidance documents relevant to TRCA interests from time to time;
WHEREAS TRCA staff have submitted several letter responses to provincial and federal
governments' requests and are in the process of responding to other government
proposals not yet due;
AND WHEREAS other various provincial initiatives relevant to TRCA interests have
recently been introduced;
IT IS RECOMMENDED THAT TRCA staff report on a summary of completed TRCA policy
submissions and TRCA work -in -progress submissions, and other provincial policy
initiatives to date in 2020, be received;
AND FURTHER THAT the Clerk and Manager, Policy, so advise municipal partners and
Conservation Ontario.
CARRIED
BACKGROUND
Since January 1, 2020, the Province of Ontario released for consultation a number of legislative,
policy, and regulatory proposals of interest to TRCA, the majority of which were posted on the
Environmental Registry of Ontario (ERO). The policy team within the TRCA Policy Planning
division are primarily responsible for leading internal reviews of government proposals on a
range of matters relevant to TRCA interests. Examples of these proposals in 2020 have been
the Ministry of Environment, Conservation and Parks' online Conservation Authorities Survey
and Environmental Registry of Ontario (ERO) postings on such topics as priority transit projects
and invasive species.
The TRCA review process typically involves circulating the government's posted materials to
staff with experience in the subject matter, facilitating interdivisional dialogue, coordinating
comments with Conservation Ontario and other conservation authorities (CAs) where
applicable, conducting additional research and analysis as needed, and drafting a response
letter that synthesizes staff comments and recommendations. Staff may also attend any
available training, webinars or consultation sessions to learn more about the proposal and have
preliminary questions addressed by provincial staff. All TRCA provincial policy submissions,
regardless of whether they are reported to the Board of Directors, are vetted through senior staff
and signed by the Chief Executive Officer prior to submittal to ensure alignment with corporate
strategic priorities and objectives.
By engaging staff from different divisions within the organization, TRCA's responses integrate
the expertise and multi -disciplinary perspectives of TRCA's teams. Staff reviewing and providing
comments range from development and infrastructure planning and permitting, ecology, water
resources engineering, and hydrogeology, to watershed planning, research and knowledge
management, climate change, ecological restoration and others, depending on the scope of the
proposal. Submissions are informed by the successes and challenges staff experience in their
day-to-day work with municipalities, proponents and other stakeholders, and emphasize shared
provincial, municipal and TRCA objectives and priorities.
RATIONALE
The outcomes of provincial government initiatives can have implications on TRCA's day-to-day
work in multiple roles as a resource management agency, a regulator, a public commenting
body with delegated authority to represent the provincial interest for natural hazards, and
landowner, in a region experiencing significant growth and associated land use and
environmental challenges. Therefore, it is important for TRCA to provide input on government
proposals in order to encourage federal and provincial initiatives to align with and support TRCA
objectives and interests.
The policy work to respond to consultations is also important for strengthening relationships and
coordination between TRCA and provincial and municipal partners. Provincial government
proposals are commonly based on the themes of streamlining and finding efficiencies to
stimulate and expedite business activities such as major plans and projects. It is vital for TRCA
to highlight its expertise, experience and shared provincial and municipal objectives and issues,
to demonstrate TRCA's valuable role in achieving efficiencies and effectiveness that support
environmentally responsible and sustainable community building.
Staff at the Ministry of Environment, Conservation and Parks, Ministry of Natural Resources and
Forestry, Ministry of Municipal Affairs and Housing and other provincial agencies sometimes
reach out to TRCA for information and advice, in recognition of TRCA's expertise in watershed
science and depth of on -the -ground experience in development and infrastructure planning and
detailed design. For example, TRCA staff led a tour of flood vulnerable areas and successfully
completed and in -process flood remediation projects in TRCA's jurisdiction, provided a
comprehensive presentation on flood risk management and the roles of CAs, and submitted a
letter of recommendations to inform the report by Ontario's Special Advisor on Flooding.
Summary of Responses
Due to the volume and limited timeline of consultations established through the ERO process,
only TRCA submissions on major initiatives (e.g. amendments to CA Act, Provincial Planning
Act and Plans) are reported to the Board of Directors or Executive Committee prior to, or
coincident with, submission to the respective ministry. In Table 1 below is a list of provincial
policy consultations for which TRCA completed and submitted responses between January 1,
2020 to date, with links to the proposals.
Recognizing that Board Members may have an interest in TRCA's submissions that were not
brought to the Board, all completed 2020 TRCA letter responses from Table 1 are contained in
the attachments to this report.
Table 1, 2020 TRCA Policy Consultation Submissions to the ERO Completed to Date
Proposal Name
Proposal Summary
Submission
Date
1. Amendment to the Record
The Ministry of the Environment,
January 13,
of Site Condition
Conservation and Parks (MECP) is
2020
(Brownfields) Regulation
proposing changes to O. Reg. 153/04 that
related to the Requirement to
would provide flexibility for a qualified
Refer to
Sample Ground Water (ERO
person (a licensed professional engineer
Attachment 1
#019-0987)
or geoscientist) to exercise professional
Link:
judgement regarding the need for
https:Hero.ontario.ca/notice/019-
groundwater testing where there is no soil
and under key conditions.
0987
2. Proposal to amend Ontario
The Ministry of Natural Resources and
January 17,
Regulation 454/96
Forestry (MNRF) is proposing an
2020
(Construction) to provide
amendment to provide an alternative,
alternative regulatory
optional rules -in -regulation approach to
approval requirements for
dam owners, to repair existing low hazard
Refer to
repairs to existing low hazard
wetland dams without obtaining approval
Attachment 2
wetland dams (ERO #019-
under Section 16 of the Lakes and Rivers
1060)
Improvement Act, if they meet the
Link:
requirements in the regulation.
https:Hero.ontario. ca/notice/019-
1060
3. Drainage Act Discussion
The Ontario Ministry of Agriculture, Food
February 18,
Paper (ERO #019-1187)
and Rural Affairs (OMAFRA) is proposing
2020
Link:
changes to the Drainage Act that would
https:Hero.ontario.ca/notice/019-
reduce burden, streamline approvals and
address stakeholder concerns while
Refer to
Attachment 3
1187
maintaining environmental standards.
4. Proposed regulations for
MECP is proposing regulations to modify
March 19,
how the Environmental
the existing environmental assessment
2020
Assessment process will
process for four priority transit projects in
apply to four priority transit
the Greater Toronto and Hamilton Area.
projects in the Greater
The regulations will help get transit
Refer to
Toronto and Hamilton Area
constructed quickly, economically and
Attachment 4
(ERO #019-0614)
transparently while maintaining
Link:
environmental oversight.
https:Hero. ontario. ca/notice/019-
0614
5. Proposed regulation made
The Ministry of Municipal Affairs and
April 3, 2020
under Ontario Regulation
Housing (MMAH) is proposing to amend
332/12 (Building Code) made
the applicable law provisions of Ontario
Refer to
under the Building Code Act,
Regulation 332/12, (Building Code). in
Attachment 5
1992 (ERO #109-1332)
relation to building permits located on or
Link:
near the designated transit corridor land
https:Hero.ontario.ca/notice/019-
as identified in an Order in Council to be
brought forward by the Minister of
1332
Transportation under the Building Transit
Faster Act, 2020 (if passed).
6. Seeking information on
MNRF is seeking information on 13
April 14, 2020
invasive species and carriers
species and one carrier for possible
April 20,
under the Ontario Invasive
regulation under the Invasive Species Act.
2020
Species Act, 2015 (ERO #019-
The information collected in response to
Refer to
1162)
this proposal will help support the Ministry
Attachment 6
Link:
in determining whether to develop a future
httas://ero.ontario.ca/notice/019-
regulation.
1162
7. Developing Prevention and
MNRF is proposing Prevention and
April 14, 2020
Response Plans for European
Response Plans for European water
https://ero. ontario. ca/notice/019-
water chestnut and water
chestnut and water soldier which are
1406
soldier under the Invasive
prohibited invasive species under
Refer to
Species Act, 2015 (ERO #109-
Ontario's Invasive Species Act. The
Attachment 7
1163)
Prevention and Response Plans will
(Preliminary
#019-1371)
support monitoring, controlling, and
comments in
Link:
eradication of these invasive plants.
separate
httas://ero. ontario. ca/notice/019-
project proponents for the purpose of
report to the
1163
In Table 2 below is a list of provincial policy consultations for which TRCA staff are in the
process of developing responses as their due dates are in the latter part of April or in May 2020;
the list also contains links to the proposals.
Table 2, 2020 TRCA Policy Consultation Submissions Pending to the ERO
ERO Posting
Proposal summary
Due date
1. Proposed regulatory
MMAH proposes Regulatory Matters
April 20,
matters pertaining to
Pertaining to Community Benefits Authority
2020
community benefits authority
Under the Planning Act, the Development
under the Planning Act, the
Charges Act, and the Building Code Act
Development Charges Act,
and the Building Code Act
(ERO #109-1406)
Link:
https://ero. ontario. ca/notice/019-
1406
2. Early Access to Land for
The Ministry of Energy, Northern
April 30,
Environmental Studies on
Development and Mines is proposing to give
2020
Transmission Projects (ERO
the Ontario Energy Board the authority to
(Preliminary
#019-1371)
grant, under specific circumstances, earlier
comments in
access to land to electricity transmission
separate
Link:
project proponents for the purpose of
report to the
httas://ero.ontario.ca/notice/019-
conducting preliminary environmental studies
Board, April
24, 2020)
1371
prior to applying for Leave to Construct.
3. Proposal to identify and
The Ministry of Energy, Northern
May 7,
protect a corridor of land for
Development and Mines seeks to identify and
2020
future electricity
preserve a corridor of land in the Northwest
(Preliminary
infrastructure in the Greater
Greater Toronto Area (GTA) for future
comments in
Toronto Area (ERO #019-
electricity transmission infrastructure so we
separate
1503)
can support growth in Halton, Peel and York
report to the
regions.
Board, April
24, 2020
Link:
We are seeking feedback on a proposed
httos://ero.ontario.ca/notice/019-
narrowed study area, as well as input on the
guiding principles we will consider in
1503
conducting the study.
4. Proposed amendments to
The Ministry of Natural Resources and
May 15,
Ontario Regulation 244/97
Forestry proposes changes to Ontario
2020
and the Aggregate Resources
Regulation 244/97 and the Aggregate
of Ontario Provincial
Resources of Ontario Provincial Standards
Standards under the
under the Aggregate Resources Act.
Aggregate Resources Act
(ERO #019-1303)
Link:
hftps://ero. ontario. ca/notice/019-
1303
5. New Statement of
The Ministry of Infrastructure is proposing a
May 25,
Environmental Values for
new Statement of Environmental Values in
2020
Ministry of Infrastructure
order to reflect the changes in its structure
(ERO #019-1536)
and mandate, as well as to acknowledge the
Link:
priority of addressing climate change.
hftps://ero. ontario. ca/notice/019-
1536
Other Policy Submissions and Updates
Also provided for the information of the Board, are the following summaries of recent non-ERO
provincial policy initiatives and other policy consultations related to TRCA interests within early
2020.
Ontario Conservation Authorities Survey
Following the provincial multi -stakeholder consultation as reported to the Executive Committee
and Board, on February 14, 2020, the Ministry of Environment, Conservation and Parks issued
an on-line survey to the public (survey closed March 13, 2020) that solicited input on:
which programs and services should be mandatory within the following:
o managing natural hazards,
o conservation and management of CA-owned/controlled lands
o drinking water source protection
the conservation authority model as it relates to:
o transparency
o permitting
0 oversight
o CA board composition, and
o key partnerships and collaborations.
TRCA's response to the survey was informed by previously Board endorsed TRCA submissions
and recommended that the Province:
• include watershed planning and the management and conservation of natural resources
within the scope of the regulations for mandatory programs and services:
o managing natural hazards,
o conservation and management of CA-owned/controlled lands, and
o drinking water source protection.
• ensure that the programs and services of the CAs maintain their watershed focus and
allow for the flexibility of including programs and services important to local
circumstances
• add a clause of indemnification or statutory immunity to the CA Act for the good faith
operation of essential flood and erosion control infrastructure and programming
• proclaim un -proclaimed sections of the CA Act associated with better deterrents to non-
compliance with section 28 permitting regulations
• update the section 29 provisions for enforcement and compliance on authority owned or
controlled lands to be consistent with the protections afforded under the Provincial Parks
and Conservation Reserves Act.
• increase provincial funding to support authorities and cooperation between all levels of
government to maximize opportunities presented by federal funding programs
• leverage the role of CAs in the land use planning and environmental protection process
(Planning Act, Environmental Assessment Act, CA Act, Clean Water Act) and expertise
of CAs in natural resource management to support implementation of provincial and
municipal priorities
• base fees for programs and services on the principle of full cost recovery, including
direct/indirect costs, rather than prescribe in regulations; furthermore, CAs be permitted
to increase fees subject to a transparent process with stakeholders and approval by the
Board of Directors, allowing fees for programs and services to keep pace with inflation,
cost of living and ensure financial sustainability
• provide at least 18 months of transition timing to allow for the development of
Memorandums of Understanding and that aligns with budget timelines
• include experts from conservation authorities, staff of the Ministries of Natural Resources
and Forestry, Environment Conservation and Parks as well as Municipal Affairs and
Housing, and municipalities when developing the draft regulations
The Province has reported on the survey website that over 2,200 comments were submitted
and that a summary of the online results will be posted on the website in the coming months. It
should also be noted that several municipalities within TRCA's jurisdiction, (and across the
Province), passed Council resolutions of support for the valuable work of conservation
authorities for submission to the Province. The timing of next steps and any amendments to the
Act or release of the regulations remains unknown at this time, but the Ministry has advised that
it will keep Conservation Ontario apprised.
Provincial Policy Statement 2020
The Provincial Policy Statement (PPS 2020) was released on February 28, 2020 and comes
into effect on May 1, 2020, replacing the PPS 2014. TRCA previously reported to the Board and
submitted comments to the Province on the proposed version of the PPS in 2019.
TRCA is generally supportive of several amendments made in the PPS 2020, including a
statement in Section 3.0 Protecting Public Health and Safety that directly supports the role of
CAs in mitigating natural hazard risks, including risks associated with climate change impacts,
and supports collaborative work among CAs, the Province, and planning authorities in achieving
this goal. The PPS is more action -oriented with the phrase "shall prepare for the impacts of a
changing climate' added to various policies throughout the PPS. TRCA appreciates the
recognition in policy that evaluating and preparing for the impacts of a changing climate to water
resource systems is best done at a watershed level.
Further provincial guidance to support policy implementation was identified in TRCA's previous
comments and remains applicable. This includes how preparation for the impacts of a changing
climate will be implemented through planning and development and what climate projections
should be used as a standard across the province. Similarly, TRCA supports policies that have
been strengthened to require Indigenous consultation and engagement but further direction on
the execution of this process is required.
Section 3.1.1 in Natural Hazards has been amended to reference provincial guidance to direct
development in the context of natural hazards and states that the guidance will be "amended
from time to time." There is an urgent need to have the technical guidance updated to reflect
current technology and approaches, particularly within the urban context, so as not to be a
barrier for innovative solutions.
The final PPS, 2020 excluded policies that appeared in the proposed version of the PPS. The
ability for municipalities to "manage" wetlands that are not provincially significant and a proposal
to "fast track" certain applications were removed. TRCA previously advocated for the further
refinement and definition of the wetlands -related policy, and for the definition of applications that
are considered priority for "fast tracking" as well as the process for achieving this fast tracking.
On a positive note, the policy permitting aggregate extraction in natural heritage features was
removed.
PPS Part IV states that a key provincial interest is the wise use and management of the
Province's natural heritage resources, water resources, including the Great Lakes, agricultural
resources, mineral resources, and cultural heritage and archaeological resources. However, the
PPS, 2020 removed direction in PPS, 2014 that intensification and redevelopment shall be
directed in accordance with the policies in Section 2: Wise Use and Management of Resources
and Section 3: Protecting Public Health and Safety. As well, PPS, 2020 removed direction that a
planning authority shall apply the policies of Section 2 and Section 3 in determining the most
appropriate direction for expansions to the boundaries of settlement areas or the identification of
a settlement area. While these statements have been deleted from the PPS 2020 and it would
be preferred that they remain, within TRCA's jurisdiction, the policies of Section 2 and Section 3
of the PPS remain applicable to any adjustments or expansions to the boundaries of settlement
areas under the more specific provisions of A Place to Grow: Growth Plan for the Greater
Golden Horseshoe (2019).
Other TRCA recommendations that were not addressed in PPS:
• recognition in policy or Preamble of the need for complete applications that
demonstrate consistency with the PPS in order to achieve the Province's goal to
streamline and fast-track priority applications to increase the housing supply (Note:
this would have also addressed the reduced application review times under the
Planning Act and appeals to the LPAT);
• to not weaken various existing polices through wording changes from "shall" to
"should"
• to maintain the current policy wording that "Planning for stormwater management
shall not increase risks to human health and safety and property damage' instead of
,'mitigate the risks'; and
• minor wording edits in various policies to strengthen protection and enhancement of
the natural heritage system and the water resources system, and to protect life and
property from natural hazards.
Ontario's Flooding Strategv
On March 9, 2020, the Province released "Protecting People and Property: Ontario's Flooding
Strategy". The Strategy renews the Province's commitment to protecting people and property by
strengthening preparedness for flooding. To help achieve this goal, the Strategy outlines steps
to be taken by Ontario over the next several years and actions designed to address and build
upon the recommendations identified by Ontario's Special Advisor on Flooding.
The Strategy outlines five priority areas, supported by a set of actions and activities, which
complement TRCA's existing flood risk reduction activities, namely:
1. Understand Flood Risks
2. Strengthen Governance of Flood Risks
3. Enhance Flood Preparedness
4. Enhance Flood Response and Recovery
5. Invest in Flood Risk Reduction
Also noted in the Strategy: "The Province is committed to working with municipalities, the
federal government, homeowners, conservation authorities, industry and Indigenous
communities to advance the actions contained within this Strategy." TRCA staff will be
attending a webinar presentation by the Ministry of Natural Resources and Forestry on April 23,
2020 that will provide an overview of the Strategy and potential next steps being considered.
TRCA looks forward to contributing our experience and expertise to assist the Ministry in
achieving the goals and objectives outlined in the Strategy.
Federal consultation — Canada's Changing Climate
On March 30, 2020, TRCA submitted comments to Natural Resource Canada (NRCan) on the
Ontario chapter draft report of the Regional Perspectives volume in Canada in a Changing
Climate: Advancing our Knowledge for Action. This report is part of a national scale assessment
being coordinated by NRCan to examine how Canada's climate is changing, the impacts of
these changes, and how we are adapting to reduce climate change risks. The Ontario chapter
seeks to enhance understanding of climate change impacts in the Ontario context, document
adaptation progress across the province, and increase awareness of the relevance of climate
change and the need for timely action.
TRCA's review effort was led by the Research and Knowledge Management team. Comments
and recommendations advocated for:
• Greater recognition of watershed planning as a key tool for evaluating and preparing for
the impacts of climate, in alignment with Ontario's Provincial Policy Statement;
• Expansion of local and regional examples of climate change adaptation to highlight the
leadership demonstrated by conservation authorities, municipalities, and other
regional/local organizations across Ontario;
• Increased integration of urban forest planning and management, including the
opportunity to include green infrastructure in municipal asset management plans;
• Greater emphasis on the need for provincial technical guidance to support
implementation of provincial policies for how to prepare for the impacts of a changing
climate. This includes guidance on how to account for and integrate climate change into
flood plain mapping and development and infrastructure planning and design, and
• Highlighting the need to address climate change adaptation in the urban context where
already stressed natural systems are under mounting pressure from redevelopment and
intensification. It should be emphasized that these scenarios require innovative solutions
for stormwater retrofit, natural hazard mitigation and remediation, as well as ecological
restoration to achieve greater resilience.
Bill 189 — Amendments to Planning Act and Development Charges Act
On April 14, 2020, the Ontario Government passed Bill 189, the Coronavirus (COVID-19)
Support and Protection Act, which amended a number of Acts including the Planning Act and
Development Charges Act resulting in the following:
• Planning Act amendments that came into force on April 14, 2020, authorize the Minister
of Municipal Affairs and Housing to create regulations in connection with a declared
emergency to govern specified timelines associated with land use planning matters.
• Ontario Regulation 149/20 under the Planning Act, which came into force on April 15,
2020. Prior to the release of the regulation, the Ministry of Municipal Affairs and Housing
advised municipalities that the intent is to allow for suspension of specified timelines
associated with land use planning matters that could be applied retroactively to the date
that an emergency was declared.
• It should be noted that municipalities and planning boards can still make decisions on
land use planning matters during the period of suspended timelines, through virtual
channels, pursuant to the Municipal Emergency Act, 2020, which permits members of a
municipal council or local board to participate electronically in a meeting and be counted
in determining whether a quorum of members is present.
• A new section 9.2 of the Development Charges Act, 1997, would allow any development
charge by-laws that were set to expire on or after March 17, 2020 to remain in force until
six months after the termination of the emergency, in an effort to give municipalities time
to replace them.
• Interim -control by-laws that were in effect on March 17, 2020 and were not repealed
before April 15, 2020, and would expire before the emergency terminates, are deemed
to remain in effect for a specified period after the emergency. Interim control by-laws in
effect on March 17, 2020 that would not expire before the emergency terminates are
deemed to remain in effect after they would otherwise expire for a specified period.
TRCA's office has been closed to the public due to the COVID situation, our Infrastructure and
Development Planning and Permit staff and Technical Review staff continue to operate remotely
to maintain business continuity and service delivery to support municipalities, stakeholders and
the public. Staff are available by telephone and email for clients and able to assist with
electronic planning and permit submissions. Staff also participate in conference call and/or
virtual meeting with municipalities, agencies, development industry and consultants.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built
environment
Strategy 8 — Gather and share the best sustainability knowledge
Strategy 12 — Facilitate a region -wide approach to sustainability
FINANCIAL DETAILS
Staff are engaged in this policy analysis work per the normal course of duty, with funding
support provided by TRCA's participating municipalities to account 120-12. No additional
funding is proposed to support the policy analysis work associated with the preparation of these
comments.
DETAILS OF WORK TO BE DONE
TRCA staff will continue to monitor the Environmental Registry of Ontario and the Province of
Ontario News' Website to ensure TRCA is aware of, and where appropriate participates and
comments on, legislative, regulatory, policy and guidance initiatives affecting TRCA interests. In
particular, staff are waiting for the Province to launch consultation on the draft regulations under
the amended Conservation Authorities Act and potentially further amendments to the Act.
Staff will keep the Board of Directors informed of TRCA submissions at regular intervals and will
monitor the outcomes of future decision notices, and report on the implications of legislative,
regulatory and policy initiatives as appropriate. Staff will also update TRCA policies and
procedures as required and facilitate training to reflect legislative and policy changes affecting
TRCA.
Report prepared by: Mary -Ann Burns, extension 5763, Jessica Murray, extension 6437
Emails: maryann.burns(a)trca.ca, jessica.murray(o)trca.ca
For Information contact: Mary -Ann Burns, extension 5763, Laurie Nelson, extension 5281
Emails: maryann.burns(cDtrca.ca, laurie.nelsonna.trca.ca
Date: April 24, 2020
Attachments: 7
Attachment 1:
TRCA Submission to ERO#019-0987
Attachment 2:
TRCA Submission to ERO#019-1060
Attachment 3:
TRCA Submission to ERO#019-1187
Attachment 4:
TRCA Submission to ERO#019-0614
Attachment 5:
TRCA Submission to ERO#019-1332
Attachment 6:
TRCA Submission to ERO#019-1162
Attachment 7:
TRCA Submission to ERO#019-1163
Attachment 1 Toronto and Region
40 Conservation
January 13, 2020 Authority
BY E-MAIL ONLY (saniay.coelho(cbontario ca)
Mr. Sanjay Coelho
Environmental Policy Branch
40 St Clair Avenue West, Floor 10
Toronto, ON M4V1M2
Dear Mr. Coelho:
Re: Amendment to the Record of Site Condition (Brownfields) Regulation (ERO #019-0987)
Thank you for the opportunity to comment on the Ministry of Environment, Conservation and Parks'
Environmental Registry (ERO) posting on the proposed regulatory changes to the requirements for
groundwater sampling for brownfield development.
The Toronto and Region Conservation Authority (TRCA) undertakes a dual role with respect to the
movement and use of excess soil within its watershed -based jurisdiction: as a regulator of site grading
and the placement, dumping or removal of any material, originating on the site or elsewhere; and as a
proponent of construction projects on TRCA-owned lands.
TRCA conducts itself in accordance with the objects, powers, roles and responsibilities set out for
conservation authorities (CA) under the Conservation Authorities Act and the MNRF Procedural
Manual chapter on CA policies and procedures. TRCA is:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
TRCA is also the lead Source Protection Authority for the CTC Source Protection Region, which
encompasses the Credit Valley, Toronto and Region, and Central Lake Ontario Source Protection
Authorities. Under the Clean Water Act, 2006, TRCA has a key role in the protection of the sources of
drinking water for an estimated 3.4 million Ontario residents. This work includes the development of
the CTC Source Protection Plan (the Plan) as well as supporting our municipal partners with technical
and policy planning advice with respect to implementation of the Plan.
Brownfield redevelopment represents an opportunity to optimize the use of existing drinking water
systems as well as to mitigate the impacts of past land uses that may pose a risk to municipal drinking
water systems. However, the process must ensure that redevelopment does not inadvertently impact
the quality or quantity of municipal drinking water supplies.
TRCA has provided detailed comments to the ERO previously on several proposals for the provincial
Excess Soil Management Policy Framework and Brownfield regulation informed by TRCA's
experience in development and infrastructure review and the management of "large scale fill" or
"excess soil" for projects in our nine urban and urbanizing watersheds and Lake Ontario shoreline
(e.g. Tommy Thompson Park -Toronto, Lakeview Waterfront Connection Project - Mississauga).
T: 416.661.6600 IF: 416.661.68981 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
Proposed Regulatory Amendment
We understand the government's current proposal would provide flexibility for a Qualified Person to
exercise professional judgement regarding the need for groundwater testing where excavation has
removed the soil down to bedrock and under key conditions.
General Comments
TRCA staff have reviewed the proposal as described in the ERO posting and generally support the
spirit of the initiative to streamline redevelopment processes to encourage urban revitalization and
environmental remediation. We understand that the proposed amendment exempts properties from
groundwater sampling that are municipally serviced, more than 30 metres from a water body, are not
an "enhanced investigation property" under O.Reg 153104, and are not part of a "risk assessment".
We further understand that properties that are "serviced by a municipal drinking water system"
constitutes those with a drinking water source that is Lake -based or from a municipal well. Therefore,
staff presume that a property could meet all the criteria for exemption but still be in proximity to a
municipal well (i.e. wellhead protection area). In the absence of groundwater testing, it is possible that
the bedrock groundwater system has become unknowingly contaminated, which may place the
municipal water system at risk.
Of lesser risk, but still of note, is that a municipally serviced property (either Lake- or municipal well -
based) may still be in proximity to a private well serving other properties not municipally serviced, for
which a sampling exemption poses a risk for that private water source.
TRCA Recommendation: That the proposed regulatory amendment includes the following additional
criteria in the determination of exemption from groundwater sampling:
1. Confirmation that the subject property is not located within a Wellhead Protection Area A or B
(WHPA-A or WHPA-B) as prescribed in Source Protection Plans under the Clean Water Act;
2. Confirmation that the property is not located within 100 metres of a private well used as a
potable water source.
We trust these comments are clear and of assistance. Thank you once again for the opportunity to
comment on the regulatory amendment for brownfield development. Should you have any questions
or wish to meet to discuss our remarks, please contact the undersigned at 416.667.6290 or at
ioh n. m ackenzieticD-trca. ca.
Sincerely,
John MacKe&,.Sc.(PI), MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell, Director, Restoration and Infrastructure
Don Ford, Senior Manager, Hydrogeology and Source Water Protection
Jennifer Stephens, Manager, Source Water Protection
Toronto and Region Conservation Authority 1 2
Attachment 2
February 3, 2020
BY E-MAIL ONLY (stacey.vojtek@ontario.ca)
Stacey Vojtek
Crown Forests and Lands Policy Branch - Crown Lands Section
300 Water street
5th Floor, North tower
Peterborough, ON
K9J 3C7
Dear Ms. Vojtek:
Toronto and Region
Conservation
Authority
Re: Proposal to Amend O. Reg 454/96 (Construction) under the Lakes and Rivers
Improvement Act (ERO #019-1060)
Thank you for the opportunity to comment on the Ministry of Natural Resources and Forestry's
Environmental Registry of Ontario (ERO) posting on the proposal to amend Ontario Regulation
454/96 (Construction), to provide alternative regulatory approval requirements for repairs to existing
low hazard wetland dams under the Lakes and Rivers Improvement Act (LRIA).
The Toronto and Region Conservation Authority (TRCA) undertakes a dual role with respect to works
affecting wetlands, lakes, and rivers within its watershed -based jurisdiction: as a regulator of
wetlands, shorelines and watercourse alterations within regulated areas, and as a conservation land
manager and proponent for construction and remediation projects, largely on TRCA-owned land.
TRCA conducts itself in accordance with the objects, powers, roles and responsibilities set out for
conservation authorities (CA) under the Conservation Authorities Act and the MNRF Procedural
Manual chapter on CA policies and procedures, and the Class Environmental Assessment for
Remedial Flood and Erosion Control Projects. TRCA's roles are:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A Source Protection Authority under the Clean Water Act;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
Proposed Regulatory Amendment
We understand the government's current proposal would amend Ontario Regulation 454/96
(Construction). If passed, this amendment would provide: "an alternative, optional rules in regulation
approach" to wetland dam owners, to repair existing low hazard wetland dams without obtaining
approval under Section 16 of the LRIA; these rules would only apply if dam owners meet the
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
requirements in the regulation. The proposal states that alterations, improvements and repairs to low
hazard wetland dams are a low risk activity and do not need to be subject to the same requirements
as larger, more complex dams that may have more significant public safety, dam safety or
environmental interests. This risk based, streamlined process has been developed and supported
through evidence collected by the Ministry over the past six years through a pilot project.
General Comments
TRCA is supportive of a risk based approach to streamlining approvals and that an amendment to
Ontario Regulation 454/96 is being considered to exempt low risk works in order to expedite repairs to
existing wetland dams.
Detailed Comments
While TRCA staff occasionally make repairs to wetland dams, the decommissioning of low risk dams
for ecological restoration and conservation purposes is a more common undertaking. In TRCA's
jurisdiction, there are many remnant structures in watercourses that no longer serve a function and
should be removed in order to re-establish a more natural function to the watercourse. Enabling a
proactive approach to decommissioning low risk dams is critical to improving stability and function
within watercourses and is consistent with the objectives of the LRIA. Unfortunately, due to the length
and cost of permitting processes, remnant structures are often left in the watercourse and are not
maintained. Over time, they negatively impact channel stability, and overall natural system
function. As well, they frequently lead to increases in stream temperature, negatively impacting habitat
for fish and wildlife.
In light of the above, TRCA is requesting the current proposed amendment for alternative optional
rules be expanded to include the removal of low risk dams for improved ecologic health,
morphological and hydrologic function. Alternative, optional rules for removal of low risk dams within
the LRIA regulation would not undermine requirements for sound hydrologic engineering and fluvial
geomorphic design principles, given that legislation governing in -water works would remain
applicable, such as the federal Fisheries Act, the Endangered Species Act, and the Conservation
Authorities Act. In addition, including a requirement to publicly post the project plan, risk assessment
report and mitigation measures would facilitate transparency and tracking of these projects. Benefits
of this approach would include:
• Reducing permit backlog;
• Streamlining by allowing more time for MNRF to review higher -risk projects; and
• Promoting the completion of restoration and mitigation works in an efficient and cost-effective
manner.
Further, the definition of "wetland dam" could benefit from being clearer and more concise. In this
regard, the Province could consider using the 1999 Ontario Dam Safety Guidelines definition of dam
as the criteria for defining what structures can be exempt from Section 16 approval. TRCA staff
suggest that all dams that meet the criteria below could be exempt, contingent on the alteration or
repair meeting LRIA Technical Bulletin requirements:
• dams with height less than 3.0 metres above the original stream bed;
• dams with height less than 2.0 metres above the original stream bed and a reservoir
surface area of 2.0 hectares or less;
• the dam must have a low hazard potential classification, as determined by a licensed
engineering practitioner;
• any alterations, improvements and repairs must not change the hazard potential
classification of the dam.
Toronto and Region Conservation Authority 12
This would create clear screening criteria for determining what constitutes a wetland dam and lead to
a number of other benefits, such as:
• Encouraging dam owners to undertake repairs;
• Reducing regulatory burden and costs to dam owners;
• Decreasing the amount of time required to alter, improve and repair dams;
• Reducing Ministry workload.
TRCA Recommendations:
1) That the proposed regulatory amendment be expanded to apply to the decommissioning of
low risk dams for ecological restoration and conservation purposes.
2) That projects meeting the proposed expanded amendment criteria be publicly posted to
ensure transparency, accountability and tracking.
3) That the proposed regulatory amendment include a clear definition of what constitutes a
"wetland dam".
4) Additional criteria be included for exemption consisting of the specifications listed above for
sizing and hazard classification.
We trust these comments and recommendations are clear and of assistance. Thank you once again
for the opportunity to comment on the regulatory amendment for repairs to existing low hazard
wetland dams. Should you have any questions or wish to meet to discuss our remarks, please contact
the undersigned at 416.667.6290 or at lohn.mackenzie(o�trca.ca.
Sincerely,
it,
John MacKenzie, M.Sc.(PI), MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell, Director, Restoration and Infrastructure
Toronto and Region Conservation Authority 13
Attachment 3
February 19, 2020
BY E-MAIL ONLY (sara.peckford(aDontario.ca)
Sara Peckford
Ministry of Agriculture, Food and Rural Affairs
Food Safety and Environmental Policy Branch
1 Stone Road West
Ontario Government Building, 2nd floor, Southwest
Guelph, ON
N1 G 4Y2
Dear Ms. Peckford:
Re: Drainage Act Discussion Paper (ERO #019-1187)
Toronto and Region
Conservation
Authority
Thank you for the opportunity to comment on the Ministry of Agriculture, Food and Rural Affairs'
Environmental Registry (ERO) posting on the Drainage Act Discussion Paper.
The Toronto and Region Conservation Authority (TRCA) conducts itself in accordance with the
objects, powers, roles and responsibilities set out for conservation authorities (CA) under the
Conservation Authorities Act and the MNRF Procedural Manual chapter on CA policies and
procedures as:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
In these roles, TRCA works in collaboration with municipalities and stakeholders to protect people and
property from flooding and other natural hazards, and to conserve natural resources. As stewards of
the land, the agricultural community is a key partner in achieving the long-term health of our
watersheds.
Drainage Act and Conservation Authorities Act Protocol
The purpose of the Drainage Act is to establish a process for creating mutual agreement drains and
petition drains (also called municipal drains). The ERO Drainage Act Discussion Paper focuses on
petition drains, not mutual agreement drains. Petition drains are created when landowners petition
area municipalities for design and construction of drainage works, with the associated costs assessed
to landowners benefitting from the drainage works. These municipal drains are generally constructed
to improve agricultural drainage.
The process to install a new municipal drain, or to alter or expand an existing municipal drain, may
trigger the need for a conservation authority permit under section 28 of the Conservation Authorities
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
Act (CA Act). Additionally, maintenance and repair of existing municipal drains is the legal
responsibility of municipalities and may also require a CA Act s.28 permit.
In order to resolve legal liability issues for municipalities and conservation authorities arising from
municipal drain provisions in the Drainage Act and the Conservation Authorities Act, the inter -agency
Drainage Act & Section 28 Regulations Team (DART) was formed in 2008. The DART produced the
"Drainage Act and Conservation Authorities Act Protocol" (the DART Protocol) and joint Drain
Maintenance or Repair Notification Form (the Form), which may be used to apply for permissions from
conservation authorities, the Ministry of Natural Resources and Forestry, and Fisheries and Oceans
Canada for municipal drain maintenance and repair. The DART Protocol and Form do not address
permissions for new drains and improvements to existing drains. Use of the Form simplifies the
application process for proponents by using a single form for all permissions. The Form must be
submitted to each of the agencies from which permissions are required.
Regarding CA Act s.28 permissions, the DART Protocol includes a set of Standard Compliance
Requirements for regular repair and maintenance activities that, if followed, serve as the written
permission to proceed with work under the CA Act. Implementation of the DART Protocol has
improved regulatory certainty, reduced burden and streamlined CA Act s.28 permitting requirements
for routine maintenance and repair of existing municipal drains. This is to the benefit of landowners
that depend on municipal drains and the municipalities liable for the drainage works, while still
meeting the requirements of CA regulations.
Government Proposal
We understand the government plans to propose changes to the Drainage Act that would reduce
burden, streamline approvals and address stakeholder concerns while maintaining environmental
standards. The Drainage Act Discussion Paper describes the proposed changes as intending to:
• provide the minister with legislative authority to develop and sign off on technical protocols
such as the Drainage Act and Conservation Authorities Act Protocol
• create a new streamlined Drainage Act process for minor improvements
• enable a simplified process to update the engineer's report to account for changes to the
design made during construction
General Comments
TRCA staff have reviewed the proposal as described in the Discussion Paper and support the
initiative to streamline review processes to facilitate drainage critical for agricultural productivity and
the production of food.
TRCA Responses to Discussion Paper Questions
Consultation Question 1:
Beyond the DART Protocol, what additional protocols could be established to help streamline
approvals?
TRCA is supportive of new protocols consistent with the DART Protocol approach to appropriately
streamline review processes for agricultural drainage works while meeting the requirements of s.28
CA regulations. Therefore, any new streamlining measures should maintain requirements for
appropriate technical analyses for all drainage works that are not like -for -like replacement projects to
ensure natural features and hazards are protected and adverse upstream or downstream impacts do
not occur. For example, a Qualified Professional should prepare a hydraulic analysis for culvert
Toronto and Region Conservation Authority 12
extensions that form part of the approved drain infrastructure. Hydraulic analyses should be required
for other proposals to change channel geometry and similar projects that may affect the flood plain.
Consultation Question 2:
What projects should be included in the definition of minor improvements? What else would you like a
minor process to achieve?
The parameters and associated thresholds within the new processes for minor works should define
which drainage work types, size and scale constitute minor improvements. The discussion paper
mentions developing protocols to streamline approvals for "low risk activities." As with the term "minor
improvement," the term "low risk activities" should be defined and CAs could assist given our efforts
through the DART — see the definition of minor projects as articulated in the current DART Protocol.
We note that the 2017 Fisheries and Oceans Canada publication, "Guidance for Maintaining and
Repairing Municipal Drains in Ontario" may provide additional guidance.
Consultation Question 3:
Do you have any specific concerns with any of the items discussed in the paper?
Regarding section 3. Simplifying Administrative Processes, TRCA is supportive of a simplified process
to update the engineer's report to account for any changes made during construction. This could be a
practical measure and an improvement in the process. TRCA suggests that any design changes from
the permitted/approved design should be in conformance with any conditions of the initially permitted
design.
Consultation Question 4:
Do you have any additional suggestions to reduce burden or contribute to additional opportunities for
your business?
In order to assist applicants, technical guidance should clearly articulate what is required in technical
reports to support a project. For instance, for an environmental appraisal (section 6 of the Drainage
Act), the method to weigh and evaluate criteria in the appraisal through a sustainability lens
(examining the economic, environmental and social aspects of proposed drainage works) should be
outlined. This additional guidance would enhance certainty for all stakeholders and contribute to
efficient and effective review processes.
In TRCA's experience, there are situations where watercourses that form part of municipal drains are
re -naturalized and become surrounded by urban development through ongoing planning processes.
Currently, municipal drains in urban settings that are not abandoned through Drainage Act processes
(sections 19 and 84) involve assessing individual urban dwellings' drain maintenance costs (taxes to
maintain drains), even though these drains are no longer necessary for agricultural purposes.
Amendments to the Drainage Act, or development of new protocols, might consider outlining terms for
what happens to a municipal drain when urban development occurs, and the drain is no longer
necessary for agricultural purposes.
Drain abandonment that occurs upon urban development may present opportunities for ecological
restoration of watercourses and avoiding future drain maintenance activities that no longer benefit
surrounding land uses.
Toronto and Region Conservation Authority 13
TRCA Recommendations
In order to achieve a streamlined process to support agricultural operations and continue to ensure
the protection of people and property from natural hazards and the conservation of natural resources,
TRCA recommends that:
1) The introduction of new streamlining measures or any proposed changes to the Drainage Act
maintain the requirement for a permit where applicable, in accordance with section 28 of the
Conservation Authorities Act and the DART Protocol;
2) The parameters and thresholds defining minor improvements and low risk activities, where
they affect CA regulated activities, are developed in consultation with CAs.
3) Technical guidance for study requirements be made available to applicants to enhance
certainty for project proponents.
4) Should the proposed amendments to the Act or new streamlining measures address drain
abandonment, the protection and restoration of any remaining natural features be considered
in consultation with conservation authorities as applicable.
Thank you once again for the opportunity to provide comments on the Drainage Act Discussion
Paper. Should you have any questions, require clarification on any of the above, or wish to meet to
discuss our remarks, please contact the undersigned at 416.667.6290 or at iohn.mackenzie(cDtrca.ca.
Sincerely,
John MacKenzie, M.Sc.(PI), MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell. Director. Restoration and Infrastructure
Toronto and Region Conservation Authority 14
Attachment 4
March 19, 2020
BY E-MAIL ONLY (ken.cunningham(a�ontario.ca)
Ken Cunningham
Environmental Assessment Branch
Ministry of the Environment, Conservation and Parks
135 St. Clair Avenue West
Toronto, Ontario M4V 1 P5
Dear Mr. Cunningham:
Toronto and Region
Conservation
Authority
Re: Proposed regulations for how the Environmental Assessment process will apply to four
priority transit projects in the Greater Toronto and Hamilton Area (ERO #019-0614)
Thank you for the opportunity to comment on the Ministry of Environment, Conservation and Parks'
Environmental Registry (ERO) posting on the proposed regulations for how the Environmental
Assessment process will apply to four priority transit projects in the Greater Toronto and Hamilton
Area.
Toronto and Region Conservation Authority (TRCA) is a key participant in the environmental
assessment (EA) process within its watershed -based jurisdiction, both as a reviewer of EAs and as a
proponent of undertakings under the Environmental Assessment Act. TRCA conducts itself in
accordance with the objects, powers, roles and responsibilities set out for conservation authorities
(CAs) under the Conservation Authorities Act and the MNRF Procedural Manual chapter on CA
policies and procedures. TRCA's roles are:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under Section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A Source Protection Authority under the Clean Water Act;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
In these roles, TRCA works in collaboration with municipalities and stakeholders to protect people and
property from flooding and other natural hazards, and to conserve natural resources.
Government Proposal
We understand the government's current proposal would modify the existing environmental
assessment process for four priority transit projects in the Greater Toronto and Hamilton Area. It will
modify the existing Transit Project Assessment Process (TPAP), as set out under Ontario Regulation
231/08 for Transit Projects and Metrolinx Undertakings, to better suit a public-private partnership (P3)
project delivery model, while ensuring appropriate consultation occurs, and that the protection of the
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L41K 5R6 I www.trca.ca
environment remains a priority. Specifically, the proposal is to enact a new regulation pertaining
specifically to the Ontario Line Project, and to amend O. Reg. 231/08 Section 15.
The existing TPAP is a scoped environmental assessment process for certain classes of transit
projects specified in Schedule 1 of O. Reg. 231/08. These project classes are exempt from the more
rigorous class environmental assessment process required by Part 11.1 of the Ontario Environmental
Assessment Act. We understand that the current government proposal is for a further scoped EA
process, as compared with the TPAP, for the four priority transit projects, and furthermore that
substantial components of the process will be completed within the coming months so construction
may begin before the end of 2020.
General Comments
TRCA staff have reviewed the proposal and generally support streamlining the delivery of priority
public transit projects while maintaining environmental oversight. TRCA works regularly with its
provincial and municipal partners on public infrastructure projects while avoiding duplication and
delay. At the same time, we recognize the importance of a robust assessment of environmental,
social and economic considerations and public consultation processes, appropriately scoped for
project scale and location.
Proposed Ontario Line Regulation
Issues resolution
TRCA supports that objections to the proposed projects are addressed through an issues resolution
process that Metrolinx manages. It has been our experience working on other Metrolinx projects, that
when Metrolinx maintains full control of their project from a project management perspective, a
timelier review and commenting process is facilitated.
Early Works
The Provincial Policy Statement (2020) states the objective to direct development away from areas
of natural and human -made hazards, which protects public health and safety, and minimizes cost,
risk and social disruption. Through this lens, TRCA has a long-standing relationship with Metrolinx
working on major facilities to ensure they are planned and developed to avoid and or minimize
impacts from the provincial interest on natural hazards, specifically flood risks.
TRCA emphasizes that natural hazards associated with flooding and erosion must be accounted for
during the EA phase in order to properly manage their associated risk to infrastructure investments
and the public users of transit projects. The proposed early works process may not account for this,
which is of concern to TRCA due to the Ontario Line's location within the lower Don River flood plain
and in an area particularly affected by the fluctuating Lake Ontario levels. Considerable financial
resources are currently being channeled towards addressing flood risk to over 290 hectares of
downtown Toronto and the Port Lands. The studies, monitoring and information arising from the Port
Lands Flood Protection initiative should be considered, maintained and incorporated into the planning
and development of the Ontario Line. It will be critical that Metrolinx engages with key stakeholders of
the Port Lands Flood Protection Initiative to identify and avoid these flood risks as well as develop
mitigation measures. TRCA is recommending that the responsibility and accountability for planning,
design and implementation of mitigation measures remain with Metrolinx and not be assigned to
contractors.
Toronto and Region Conservation Authority 12
Climate Change Considerations
The impacts of a changing climate should also be accounted for during the project's design phase in
order to inform risk management measures. For the Ontario Line, as an example, this may include
utilizing updated TRCA or other models to account for changing climate and including additional
freeboard for planned infrastructure in flood prone areas to accommodate for rising Lake Ontario
water levels. It is imperative that technical studies, including evaluating and planning for the
mitigation of such risk using current methodologies, be completed by Metrolinx prior to the detailed
design phase. These studies may take time to complete, and as such may cause conflict in the
approval of some of the proposed early works, namely bridge structures and any other structures
such as stations proposed in flood plain areas.
Accordingly, TRCA staff are concerned with the scope of the proposed "early works" definition of
project components that will be allowed to proceed to construction before the completion of the draft
Environmental Impact Assessment Report. Early works typically include activities such as land
assembly, preloading and utility relocations. This contrasts with the currently proposed major
structural realignment activities included as "early works' such as station construction, bridge
replacements and expansions and rail corridor expansion. TRCA cautions that as currently proposed
the broad definition of early works may result in major alignment challenges with unforeseen impacts
to public safety related to flooding and erosion impacts, as well as negative impacts to natural
systems that may include natural heritage features of provincial interest.
Another concern is existing riverine flood protection infrastructure that has been constructed to
protect life and property, impacts to which must be avoided through the design of the Ontario Line.
In addition, the groundwater conditions are a significant environmental factor along stretches of the
proposed Ontario Line corridor, much of which is proposed to be tunneled. Developing mitigation
strategies for groundwater impacts should be considered in the early works initiatives so as not to
impact the overall project schedule. TRCA notes that groundwater conditions may affect the
project's construction feasibility, and that groundwater issues are typically identified through the
existing Environmental Assessment process.
Preliminary activities should also consider land assembly/acquisition in the early works phase if the
entirety of lands within the project area are not owned by the Province. TRCA recognizes that
TRCA-owned lands may be required for project completion in certain locations and would appreciate
being involved early in the process as these negotiations can be lengthy.
Soil Considerations
TRCA has several planned erosion and hazard management infrastructure projects along the
Toronto Waterfront that could be potential sites for the placement of soils. TRCA would appreciate
continued engagement on potential soil management strategies as these projects evolve.
Draft Early Works Report
As proposed under Section 8(2).7, the Draft Early Works Report must include measures to mitigate
the negative environmental impacts of the preferred alternative. This methodology is problematic as
mitigation measures are proposed prior to assessment and evaluation of the impacts that the
preferred method of carrying out the early works and other methods might have on the environment
(and Metrolinx's criteria for assessment and evaluation of those impacts). Those steps occur as part
of the Environmental Impact Assessment Report, however, if the early works as stated in the draft
document can proceed prior to the Environmental Impact Assessment Report there could be
Toronto and Region Conservation Authority 13
unforeseen issues in the future that result in project delays. TRCA would recommend that selection
of the preferred alternative, including in the case of early works, include an evaluation of potential
impacts and mitigation to confirm feasibility and that the proposed regulation be revised to account
for an amendment process.
Preferred alternative determination
The Draft Environmental Conditions Report speaks to mitigating the environmental impact of the
preferred alternative in draft regulation Section 4(3).7, suggesting the preferred alternative is
determined based on minimal environmental information prior to completion of the Environmental
Impact Assessment Report. This approach is problematic, as mitigation occurs prior to assessment
and evaluation of the impacts that the preferred method of carrying out the works and other methods
might have on the environment (and Metrolinx's criteria for assessment and evaluation of those
impacts). Those steps occur as part of the Environmental Impact Assessment Report that follows
the Environmental Conditions Report. TRCA would prefer that the selection of the preferred
alternative include an evaluation of potential impacts and mitigation to confirm feasibility.
Assessment and reporting requirements
TRCA notes that the proposed regulation lacks a clear definition of "Environment" (draft regulation
Section 1), and which studies are to be included in an Environmental Conditions Report (Section
4(3)), Environmental Impact Assessment Report (Sections 15(1) and 18(1)), and Early Works Report
(Sections 8(2) and 11(1)). For example, stormwater, groundwater, natural hazards including flooding
and erosion, natural heritage, terrestrial and aquatic habitat studies must be specified for the report.
TRCA recommends these studies be clearly defined to ensure the proper information is assessed,
mitigated and conveyed in the Environmental Conditions Report, Environmental Impact Assessment
Report and Early Works Report.
From TRCA's perspective, it is imperative that issues associated with transit construction in proximity
to the Waterfront Toronto Port Lands and in particular the associated flood protection features in this
area, which constitute technically complex areas prone to significant flooding, are addressed and
confirmed through the preliminary Environmental Conditions Report. Satisfying complex technical
concerns in this regard is paramount to ensuring the constructability of the project which will in turn
reduce risk and save time during construction.
Given the inherent impacts on the natural heritage system associated with transit projects, ecosystem
compensation should be addressed in the various project studies. Where impact assessment and
mitigation measures are required, ecosystem compensation should also be included as a necessary
consideration. This requirement to consider ecosystem compensation earlier in the project will
streamline the approach to finalizing required compensation at later planning stages. TRCA
recommends that ecosystem compensation should be included in the draft regulation within Sections
8(2).7, 15(2).7 and 21(1).4 of the proposed regulation.
Species at risk
TRCA supports that Metrolinx may apply for and obtain authorization to proceed with measures to
accommodate any species at risk or provincial heritage properties in advance of completing the
process outlined in the regulation, subject to any consultation or other requirements associated with
those processes. In TRCA's experience, issues related to species at risk are raised at the detailed
Toronto and Region Conservation Authority 14
design stage and can delay approvals, whereas this delay could be avoided if the issues are
addressed earlier in the process. TRCA also recommends that the regulation include a protocol or
agreement whereby Metrolinx can address issues requiring federal species at risk approvals, as well
as approvals from Fisheries and Oceans Canada regarding harmful alteration or disruption, or
destruction of fish habitat under the purview of the Fisheries Act in order to avoid review delays at the
detailed design stage.
Project changes
Regarding how project changes are dealt with in the draft regulation, Section 21(2) states that the
procedure in subsection (1) for addressing a change does not apply if the change is required to
comply with another Act, a regulation made under another Act, or an order, permit, or approval or
other instrument issued under another Act. However, there is no procedure outlined for changes
required to comply with these elements (i.e., how changes required to comply with a permit issued
under another Act will be incorporated into the project's assessment and approval process). TRCA
suggests outlining how a change required to comply with another Act will be addressed and the
protocol for circulating proposed changes in order that other agencies, such as conservation
authorities remain informed.
ProDosed Chanoes to O. Rea. 231/08
As noted in our comments on the proposed Ontario Line Regulation, given the inherent impacts on
the natural heritage system associated with transit projects, ecosystem compensation should be
addressed in the various project studies. Where impact assessment and mitigation measures are
required, ecosystem compensation should also be included. It is our experience that the inclusion of
ecosystem compensation considerations earlier in the planning process will streamline the approach
to compensation at later planning stages. TRCA recommends that ecosystem compensation in
accordance with Metrolinx's standard should be included in Sections 15(1).3 and (15).4 of O. Reg.
231/08, in the addendum to the environmental project report.
TRCA Recommendations
In order to achieve a streamlined priority transit project development process in a timely manner and
continue to ensure the protection of people and property from natural hazards and the conservation of
natural resources, TRCA recommends:
1) The proposed project assessment timeline ensures projects can demonstrate that they will
avoid increasing risk of natural hazards (flood and erosion risks) to infrastructure or public
health and safety through the completion of appropriate technical studies that inform detailed
design.
2) The environmental studies required are clearly defined within the regulation to ensure the
proper information is assessed, mitigated and conveyed in the Environmental Conditions
Report, Environmental Impact Assessment Report and Early Works Report.
3) A protocol be developed for harmonizing federal approvals and any other required provincial
approvals early in the process to avoid delays prior to detailed design. The Aquatic Habitat
Toronto model involving DFO, MNRF, TRCA and other government agencies may be helpful
to consider in this regard.
Toronto and Region Conservation Authority 15
4) The scope of early works be limited to typical low risk activities such as land assembly,
staging, stockpiling, in lower risk areas of the project.
5) Should the proposed scope of early works remain as proposed, that a 30% detailed design be
required and reviewed by the government agency review team for the project to confirm
potential impacts, feasibility and mitigation measures prior to the approval of the early works.
6) We recommend that consideration of sustainability strategies such as the placement or use of
soil in nearby projects in support of nearby conservation authority flood and erosion control
projects be considered to reduce GHG emissions be a requirement.
Thank you once again for the opportunity to provide comments on the proposed regulations for how
the Environmental Assessment process will apply to four priority transit projects in the Greater
Toronto and Hamilton Area. Should you have any questions, require clarification on any of the above,
or wish to meet to discuss our comments, please contact the undersigned at 416.667.6290 or at
iohn. mackenzie(cDtrca.ca.
Sincerely,
it,
John MacKenzie, M.Sc.(PI), MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell, Director, Restoration and Infrastructure
Beth Williston, Associate Director, Infrastructure Planning and Permits
Toronto and Region Conservation Authority 16
Attachment 5
April 3, 2020
BY ONLINE SUBMITTAL ONLY
Building and Development Branch
Ministry of Municipal Affairs and Housing
777 Bay Street, 2nd Floor
Toronto, Ontario M5G 2E5
Toronto and Region
Conservation
Authority
Re: Proposed regulation made under Ontario Regulation 332/12 (Building Code)
made under the Building Code Act, 1992 (ERO #019-1332)
Thank you for the opportunity to comment on the Ministry of Municipal Affairs and Housing's
Environmental Registry (ERO) posting on the proposed amendment to Ontario Regulation 332/12
(Building Code) made under the Building Code Act, 1992. The posting provides notice that the
government is proposing to amend the applicable law provisions of Ontario Regulation 332/12, the
Building Code.
The Toronto and Region Conservation Authority (TRCA) conducts itself in accordance with the
objects, powers, roles and responsibilities set out for conservation authorities (CA) under the
Conservation Authorities Act and the MNRF Procedural Manual chapter on CA policies and
procedures for plan review and permitting activities, as follows:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A Source Protection Authority under the Clean Water Act;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
In these roles, TRCA works in collaboration with municipalities and stakeholders to protect people and
property from flooding and other natural hazards, and to conserve natural resources.
TRCA has an interest in the above noted proposal given that conservation authorities' development
regulations under section 28 of the Conservation Authorities Act are among the statutes and
regulations listed as applicable law under the Building Code, Ontario Regulation 332/12. In addition,
conservation authorities are prescribed commenting agencies under the Planning Act and
Environmental Assessment Act, whereby TRCA comments on both development and infrastructure
planning and projects traversing TRCA regulated areas. Currently, TRCA is working closely with
Metrolinx to provide technical advice on the four priority transit projects referenced in the ERO
posting. Accordingly, TRCA also commented on the related ERO posting #019-0614 for a proposed
expedited environmental assessment process for the four priority transit projects. A copy of our
submission to the Ministry of Environment, Conservation and Parks, dated March 19, 2020 has been
enclosed for your reference.
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
Government Proposal Background
The "New Subway Transit Plan for the GTHK contains commitments for four priority transit projects:
the Ontario Line, Scarborough Subway Extension, Yonge North Subway Extension, and the Eglinton
Crosstown West Extension.
In February 2020, the government introduced Bill 171, the proposed "Building Transit Faster Act",
which, if passed, would allow the Lieutenant Governor in Council to designate land as "transit corridor
land". This designation would require development proponents to obtain a corridor development
permit for development and construction activities on or near transit corridor land that may also
require coordination with subway construction.
In anticipation of Bill 171 becoming law, the Ministry of Municipal Affairs and Housing (MMAH) is
proposing to amend the "applicable law" provisions in Ontario Regulation 332/12 (the Building Code)
made under the Building Code Act, 1992.
Government Proposal
TRCA understands that the current ERO posting is requesting comments on the Ministry of Municipal
Affairs' proposal to amend the Building Code to add to the existing list of "applicable law" needed to
be upheld prior to issuance of a municipal building permit. The proposed amendment would require
that corridor development permits for new development on or near the transit corridor land are
received from the Ministry of Transportation (MTO) prior to a chief building official issuing a municipal
building permit.
TRCA General Comments
TRCA supports the government's approach to focusing development and intensification close to
transit and for coordinating development and infrastructure planning. We caution, however, that the
intensification of development and infrastructure in these corridors should not come at the expense of
other provincial interests, such as public safety from managing natural hazards and achieving more
resilient communities by protecting natural heritage systems. As stated in the Provincial Policy
Statement (2020), Ontario's long-term prosperity, environmental health and social well-being depend
on reducing the potential for public cost or risk to Ontario's residents from natural or human -made
hazards.
Currently, the Building Code regulation (O. Reg. 332/12) defines "applicable law" to include
conservation authorities' regulations made under section 28 of the Conservation Authorities Act.
TRCA's section 28 regulation, along with its commenting roles under the Planning Act and
Environmental Assessment processes, are crucial for assisting municipal and provincial partners in
meeting shared objectives for reducing natural hazard risks and conserving natural resources.
Accordingly, the different provincial interests represented in the list of applicable law should have
equal weight in development and infrastructure planning.
To this end, TRCA's role is to ensure development and infrastructure avoid risks posed by natural
hazards, mitigates and remediates risk where they must locate within hazards, and that natural
resources are conserved to enhance resilience to the impacts of urbanization and climate change. In
TRCA's and municipal partners' experience, planning for redevelopment and urban revitalization in
the complex landscapes of the four priority transit corridors requires innovative solutions for
stormwater retrofit, natural hazard mitigation and remediation, as well as ecological restoration to
achieve greater resilience, (e.g. Port Lands Flood Protection Initiative and the Ontario Line project per
attached letter). These opportunities tend to be greater at the early stages of the development and
infrastructure planning processes and when the two processes are coordinated. An example in
Toronto and Region Conservation Authority 12
TRCA's jurisdiction of where such upfront work and early coordination for redevelopment, transit
building, flood remediation and urban revitalization have furthered provincial, municipal and TRCA
objectives, is Vaughan Metropolitan Centre within the Black Creek sub -watershed adjacent to the top
of the University subway line.
TRCA Recommendations
In order to ensure the protection of people and property from natural hazards and the conservation of
natural resources, TRCA recommends that:
1) The MTO process to designate transit corridor land be coordinated with MMAH, municipalities
and conservation authorities where applicable in the early stages of the planning and/or
environmental assessment process in order to avoid increasing the risk of natural hazards
(flood and erosion risks) to infrastructure, development or public health and safety.
2) Conservation authorities' regulations made under Section 28 of the Conservation Authorities
Act continue to be "applicable law" under O. Reg. 332/12 (Building Code).
Thank you once again for the opportunity to provide comments on the proposed amendments to
Ontario Regulation 332/12 (Building Code) made under the Building Code Act, 1992. Should you have
any questions, require clarification on any of the above, or wish to meet to discuss our remarks,
please contact the undersigned at 416.667.6290 or at iohn.mackenzieQrca.ca.
Sincerely,
it.
John MacKenzie, M.Sc.(PI), MCIP, RPP
Chief Executive Officer
Encl. TRCA Submission to ERO #019-0614, March 19, 2020
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Toronto and Region Conservation Authority 13
Attachment 6
April 14, 2020
BY E-MAIL ONLY (invasive.species(a)ontario.ca)
Biodiversity Coordinator
Ministry of Natural Resources and Forestry
300 Water Street,
51 Floor, North Tower
Peterborough, Ontario K9J 3C7
Attention: Mr. Jeremy Downe
Invasive Species Policy Advisor
Biodiversity Section
Toronto and Region
Conservation
Authority
Re: Seeking information on invasive species and carriers under the Ontario Invasive
Species Act, 2015 (ERO #019-1162)
Thank you for the opportunity to comment on the Ministry of Natural Resources and Forestry's
(MNRF) Environmental Registry (ERO) posting, "Seeking information on invasive species and carriers
under the Ontario Invasive Species Act, 2015."
The Toronto and Region Conservation Authority's (TRCA) is actively involved in invasive species
management strategy and implementation within our jurisdiction, in order to conserve natural
resources. TRCA conducts itself in accordance with the objects, powers, roles and responsibilities set
out for conservation authorities (CA) under the Conservation Authorities Act and the MNRF
Procedural Manual chapter on CA policies and procedures for plan review and permitting activities, as
follows:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under Section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A Source Protection Authority under the Clean Water Act;
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
In these roles, and as stated in the Made -In -Ontario Environment Plan, CAs work in collaboration with
municipalities and stakeholders to protect people and property from flooding and other natural
hazards, and to conserve natural resources. TRCA's municipal partners rely on TRCA's assistance for
implementing the natural heritage policies of the Provincial Policy Statement by protecting and
restoring natural heritage resources through our mandate under the Conservation Authorities Act.
We understand that under the Invasive Species Act, 2015, decisions to recommend species for
regulation are based on the risk that a species poses to Ontario's natural environment and socio-
economic well-being. The Act directs that these risks be identified through species-specific ecological
risk assessments, the experiences of other jurisdictions, and public consultation.
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
Government Proposal
We understand the government's proposal seeks information on the ecological, social and economic
impacts and benefits of thirteen species and one carrier. The information collected will support the
completion of ecological risk assessments and inform the possible future development of a regulatory
proposal under the Act. These investigations are part of a government effort to review actions taken in
nearby jurisdictions, to improve regulatory consistency among jurisdictions in the Great Lakes Basin.
The species currently under review are:
• Marbled crayfish (Procambarus
virginalis)
• Tench (Tinca tinca)
• New Zealand mud snail (Potamopyrgus
antipodarum)
• European frogbit (Hydrocharis morsus-
ranae)
• Yellow floating heart (Nymphoides
peltata)
• Prussian carp (Carassius gibelio)
• Red swamp crayfish (Procambarus
clarkii)
• Fanwort (Cabomba caroliniana)
• Bohemian knotweed (Reynoutria x
bohemica)
• Giant knotweed (Reynoutria
sachalinensis)
• Himalayan knotweed (Koenigia
polystachya)
• Mountain pine beetle (Dendroctonus
ponderosae)
• Wild pigs (Sus scrofa)
The government is also reviewing the potential benefits of regulating the movement of watercraft over
land as a carrier, meaning something capable of facilitating the movement of an invasive species from
one place to another, to determine if current education initiatives focused on Clean, Drain, Dry
principles and practices should be made mandatory through regulation.
General Comments
TRCA staff have reviewed the proposal and generally supports the government's proposal to examine
the thirteen species and one carrier for regulation under the Invasive Species Act.
In TRCA's jurisdiction, invasive species management is an important consideration for ecological and
socio-economic reasons. Much of TRCA's jurisdiction contains highly altered landscapes and urban
areas with a high prevalence of invasive flora and fauna. TRCA and its partner municipalities have
repeatedly expressed a strong commitment to healthy terrestrial and aquatic ecosystems that provide
numerous ecosystem functions and services, which are critical for human health and well-being.
TRCA's The Living City Policies, 2014 (LCP) highlights TRCA's mission to work with our partners to
ensure that The Living City is built on a natural foundation of healthy rivers and shorelines,
greenspace and biodiversity, and sustainable communities. It acknowledges that the loss of native
plants and animals and the proliferation of invasive species are increasingly a threat to local
ecosystem function and that both land use and climate changes are expected to exacerbate these
issues. Accordingly, the LCP, used to guide staff review of proposed works either under the Planning
Act, Environmental Assessment Act or permits under TRCA's regulation under the Conservation
Authorities Act, contains policies to recommend a natural approach to the landscaping adjacent to
natural heritage systems with native, non-invasive and locally appropriate species.
Further, an action in TRCA's ten-year Strategic Plan (2013-2022) is to enhance our regional
watershed monitoring network so that we can identify new threats like invasive species and regularly
evaluate the effectiveness of our efforts to protect, manage, and restore greenspace. A priority of
TRCA's five-year update to the Strategic Plan is to share TRCA's research, data and leading science
to inform provincial initiatives such as this ERO posting.
Toronto and Region Conservation Authority 12
TRCA has actively managed invasive species in its jurisdiction for many years to protect and enhance
ecological features and functions, to protect human health, and to engage and educate the public.
Included in these initiatives are: monitoring, controlling, and treating invasive species, restoring
invasive species -dominated habitat on TRCA owned properties, and promoting general public
awareness. Some examples of this work include:
• community-based garlic mustard and burdock management projects,
• Asian long -horned beetle surveillance work,
• buckthorn, dog -strangling vine and Phragmites management at select sites,
• emerald ash borer hazard tree management, and
• participating in the development of the Ontario Invasive Plant Council's "Grow Me
Instead" booklets.
Responses to Questions for Public Consultation
With TRCA's roles and experience in mind, we offer the following responses to the ERO posting's
Questions for Public Consultation.
1. Do you agree/disagree that we should review the identified species and carrier for regulation
under the Invasive Species Act, 2015?
TRCA is supportive of the completion of ecological risk assessments and potential regulation of the
thirteen identified species and one invasive species carrier. Further, it is TRCA's experience that
proactive assessment and management of invasive species is required to avoid ecological,
economic and societal impacts of these species, particularly in the face of a changing climate.
Aggressive action to monitor and control invasive species in the near term can mitigate long-term
impacts.
During this review process, strong consideration should be given to the geographical distribution of
species and carriers that will be selected for assessment. Invasive species of concern may be
different in terms of their impact and current pervasiveness depending on geography and dominant
land use. For example, most dominantly urban regions have specific invasive species (e.g., Norway
maple (Acer platanoides), garlic mustard (Alliaria petiolate), common buckthorn (Rhamnus
cathartica)) and pathways/carriers that are much more problematic in these regions as compared to
the other parts of the province. Despite their relatively limited established ranges, these species may
have significant implications on provincial goals and objectives, and it is therefore critical that
additional species be reviewed for potential regulation. Partnering with local and regional
municipalities along with conservation authorities will provide this information and guidance.
TRCA staff are active in the field across our nearly 3,500 km2 jurisdiction. Staff observations and
experience have informed the identification of multiple non-native plants as existing or emerging
threats in our jurisdiction. For example, a few years ago Miscanthus sp. was typically observed
growing in ditches near residential areas where it had been planted as a garden plant and was
rarely documented in non -landscaped areas. Now, staff more commonly observe this non-native
invasive plant located relatively far from residential areas. This development justifies assessment of
the risk Miscanthus sp. poses to the natural environment and economy.
Another example is Norway maple (Acer platanoides). TRCA works with our municipal partners on
invasive species management. Based on TRCA data, Norway maple is the second most dominant
sub -canopy forest layer in Toronto ravines after Manitoba maple (Acernegundo), and is targeted for
Toronto and Region Conservation Authority 13
strategic removal from ravines by the City of Toronto and TRCA. Meanwhile, Norway maple sales by
private industry to municipalities continue, so that public dollars are used for acquiring and for
removing the species at the same time. As Norway maple was heavily planted and promoted by the
Province in the 1970s and those trees are now seed producers whose progeny is clearly
successfully in Toronto's ravines, a risk assessment should be a straight -forward exercise.
TRCA would therefore support prohibition under the Invasive Species Act of additional species
beyond those currently proposed by MNRF but recognizes that under the Act, ecological risk
assessments to determine the appropriate approach for managing each of the species must first
take place. The recommended species for regulation are listed below.
i. Amur silver grass (Miscanthus sacchariflorus)
ii. Chinese silver grass (Miscanthus sinensis)
iii. Common buckthorn (Rhamnus cathartica)
iv. Curly -leaved pondweed (Potamogeton crispus)
V. English ivy (Hedera helix)
vi. Flowering rush (Butomus umbellatus)
vii. Garlic mustard (Alliaira petiolate)
viii. Giant hogweed (Heracleum mantegazzianum)
ix. Goutweed (Aegopodium podagraria)
X. Himalayan balsam (Impatiens glandulifera)
A. Japanese barberry (Berberis thunbergit)
xii. Japanese chaff flower (Achyranthes japonica)
xiii. Japanese stiltgrass (Microstegium vemineu)
xiv. Kudzu (Pueraria montana)
xv. Lesser periwinkle (Vinca minor)
xvi. Norway maple (Acer platanoides), with appropriate notification to the horticultural industry
xvii. Oriental/Asiatic bittersweet (Celastrus orbiculatus)
xviii. Periwinkle (Vinca minor)
xix. Purple loosestrife (Lythrum salicaria)
xx. Rough manna grass (Glyceria maxima)
xxi. Sea buckthorn (Hippophae rhamnoides)
xxii. Tree of heaven (Ailanthus altissima), as it is the preferred host for the spotted lanternfly
(Lycorma delicatula) which is currently a regulated species under the federal Plant Protection
Act
xxiii. Water lettuce (Pistia stratiotes)
xxiv. White mulberry (Morus alba)
xxv. Wild chervil (Anthriscus sylvestris)
xxvi. Wild parsnip (Pastinaca sativa)
xxvii. Winged burning bush (Euonymus alatus)
xxviii. Winged euonymus (Euonymus alatus)
xxix. Winter creeper euonymous (Euonymus fortune)
xxx. Yellow archangel (Lamiastrum galeobdolon)
2. Do you have information, including personal experiences, that would help us as this review
proceeds?
Within its jurisdiction, TRCA uses and coordinates a wealth of natural environment information
collected by on -the -ground personnel who are experts in the field, including aquatic and terrestrial
biologists, field naturalists, ecological restoration experts, foresters, and plant propagation experts.
Toronto and Region Conservation Authority 14
Our staff have extensive local knowledge of the local environment, the biological conditions
associated with Lake Ontario waters within our jurisdiction, and the issues created by the existing
and emerging invasive species in the region. Given our years of experience managing invasive
species, substantial landholdings and ongoing experience in a natural heritage advisory role to
municipalities in our jurisdiction, TRCA is available to assist in incorporating our strategic invasive
species management planning and implementation expertise into the Province's review of the
thirteen species and one carrier.
3. Would the regulation of one or more of the proposed species or carrier have a positive or
negative economic impact on you or your business?
While TRCA undertakes strategic invasive species management, it does not propagate or typically
transport these species. In this regard, the regulation(s) would not have a direct effect on TRCA's
work. Asa major landowner, regulation of these species and carrier would lower the risk to our
lands due to reduced propagation and transportation of these by others within our jurisdiction, as the
impacts of invasive species on our properties include, but are not limited to, loss of biodiversity,
increased erosion risk on marginal lands and impacts to infrastructure. Reduced need for invasive
species management on our properties would be an economic benefit to TRCA.
4. What rules do you recommend be applied to some or all the identified species or carrier? See
sections 6, 7, or 8 of the Invasive Species Act, 2015 for more information.
TRCA recommends that all prohibitions, restrictions and conditions apply to all species, however, for
regulated plant species, an appropriate length of time should be provided to the horticultural industry
to allow them to make adjustments to the species they propagate and sell.
5. Should we consider exceptions to the prohibitions during the development of the regulatory
proposal (e.g. allowing the import of the species provided individuals are dead)?
Based on exceptions for currently regulated species, TRCA believes this approach is reasonable and
consistent. That being said, reproductive elements such as fish eggs can remain viable after death
for several days. Therefore, the suitability of granting such exceptions should account for the risk of
potential exotic pathogen introduction carried by dead specimens of each species, and should not
rely on generalized rules. Further, the ease of monitoring and regulating such exceptions should be
considered.
6. Are there any additional questions you would like to discuss or concerns you would like to
address?
Defining roles and responsibilities
The current Invasive Species Act (the Act) and associated O. Reg. 354/16 (the regulation) do not
define roles and responsibilities of public and private land managers regarding prevention of invasive
species spread, early detection and management of invasive species, or invasive species
eradication. TRCA would recommend that public entities should be responsible for surveillance,
prevention measures, and management of invasive species on public lands, and private landowners
responsible for the same on private lands. Governments at all levels should consider granting public
agencies and authorities involved in invasive species management blanket access permissions and
liability protection for conducting work to monitor and manage invasive species on both public and
private lands. Enhancing the accountability of these groups (including Provincial agencies,
Toronto and Region Conservation Authority 15
municipalities, conservation authorities, and private landowners including industry, institutions and
other stakeholders) through policy can help improve outcomes for limiting the economic, social and
ecological impacts of invasive species in Ontario.
A coordinated approach across jurisdictions and individual private properties, in tandem with
appropriate enforcement of the Act and associated regulation, is required to minimize the economic
and ecological impacts of invasive species in Ontario.
Due diligence for avoiding incidental spread
TRCA has identified incidental spread of invasive species as a major obstacle to effective invasive
species eradication in the province. O. Reg. 354/16 specifically addresses incidental possession and
transportation of only two aquatic invasive plant species. Prevention and Response Plans that
provide guidance and direction on avoiding incidental invasive species transportation, as well as
outreach and education campaigns to relevant industries, stakeholders, land users and land
managers are needed as part of a provincially coordinated approach to invasive species
management. Specific guidance on what constitutes "due diligence' is required for different activities
that commonly cause incidental transport of invasive species. For example, direction should be
provided on specific watercraft inspection methods to detect aquatic invasive plants prior to moving
watercraft over land and appropriate biosecurity measures to ensure proper handling and disposal of
invasive specimens. Another example is defining specific measures to adequately inspect and clean
boots, mechanical equipment and other tools when landscaping in areas that contain terrestrial
invasive species in order to avoid incidental transport of invasive species to other areas or
subsequent work sites. Enforcement of due diligence measures is critical to ensuring these measures
are effective.
Evaluating potential impacts to high value assets
High value assets, for which invasive species introduction or establishment might have higher risks
and implications based on ecological, social, and economic impacts, should be considered while
implementing regulatory rules. Experts suggest that a single invasive species may have a different
magnitude of impact depending on ecological, social, and economic characteristics of the area under
invasion. These circumstances may require additional guidance following the Act.
Enforcing the Clean, Drain, Dry principles and practices
TRCA supports the Ministry in creating regulations to enforce the Clean, Drain, Dry principles and
practices that are currently communicated to the public through an education campaign. Aggressive
action against invasive species carried by watercraft overland can be achieved through the regulation
and enforcement of Clean, Drain, Dry principles and practices, helping to limit the spread of invasive
species.
Aquarium releases of aquatic invasive species
TRCA notes that many aquatic invasive species present in Ontario originated from intentional or
accidental aquarium releases. We recommend pursuing stronger regulations applicable to hobby
fishkeeping (aquariums) and similar markets. This regulatory approach could be paired with public
education programs targeting pet/aquarium stores, aquaria enthusiasts and anglers in order to inform
these communities of risks posed to our natural environment by invasive species that can be found in
aquariums and the regulations in place prohibiting or restricting their existence in Ontario.
Public education campaigns
Additionally, TRCA recommends a public education campaign targeting residential properties and all
types of gardeners/garden clubs to ensure awareness and halt the trading of restricted plants
(including those proposed for assessment by the province and those proposed by TRCA in this
Toronto and Region Conservation Authority 16
letter). For example, TRCA has in its environmental education community outreach programs,
materials to assist residents interested in landscaping with native plants (available from
httas://trca.ca/get-involved/home-garden/). Education campaigns related to wild pigs should also be
targeted to the agricultural industry and hunters to ensure awareness and to stop the distribution and
release of wild pigs.
TRCA Recommendations
In order to ensure the conservation of natural resources, TRCA recommends that:
1) The Ministry moves forward with its proposal to investigate the 13 species and one carrier for
regulation under the Invasive Species Act.
2) The Ministry undertake ecological risk assessments to determine the appropriate approach for
managing the 30 species listed in response to discussion question #1, which pose immediate
threats to the environmental, social, and economic resilience of Ontario.
3) The Ministry amend the Act and/or associated regulation to assign the responsibilities of
invasive species prevention, avoidance of spread, and/or management and eradication to
public and private landowners and land managers to enhance accountability and improve
outcomes for invasive species management. This includes potentially including blanket
access permissions and liability protection for organizations such as TRCA that carry out
monitoring and invasive species management work. Clarifying these responsibilities may also
better facilitate existing enforcement provisions in the Act.
4) The Ministry develop and disseminate guidance on proper due diligence methods to reduce
the frequency of incidental transport of invasive species and enable greater enforcement of the
Act. This may take the form of Prevention and Response Plans coupled with outreach
campaigns to relevant stakeholders.
5) That the Ministry collaborate with municipalities and CAs to identify invasive species with high
potential impacts and determine the magnitude of ecological, social and economic issues
associated with those species' invasions, and to generally obtain information about the
species under review.
6) That all prohibitions, restrictions and conditions in Sections 6, 7 and 8 of the Act apply to all
species and the carrier (as applicable) proposed for regulation.
7) That regulations be created to regulate the movement of watercraft over land as a carrier
under the Invasive Species Act.
8) That, in addition to regulation of the thirteen species and one carrier, public awareness and
education campaigns be introduced targeting hobby fish keepers (aquariums), hobby
horticulturalists/gardeners, and the commercial businesses that support them to ensure these
communities are aware of both the risks posed by these invasive species and the new
regulations.
Toronto and Region Conservation Authority 17
9) That, in addition to regulation of the thirteen species and one carrier, communication and
awareness campaigns be introduced targeting large public landowners, land managers and
end users, such as municipalities, conservation authorities, institutions and public utilities to
ensure they are aware of the new regulations and can achieve timely compliance.
Thank you once again for the opportunity to provide feedback regarding assessment and regulation of
these thirteen species and one invasive species carrier under the Invasive Species Act, 2015. Should
you have any questions, require clarification on any of the above, or wish to meet to discuss our
remarks, please contact the undersigned at 416.667.6290 or at lohn.mackenzie(c�trca.ca.
Sincerely,
*I
John MacKenzie, M.Sc.(PI) MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell, Director, Restoration and Infrastructure
Toronto and Region Conservation Authority 18
Attachment
April 14, 2020
BY E-MAIL ONLY (invasive.species(a)ontario.ca)
Biodiversity Coordinator
Ministry of Natural Resources and Forestry
300 Water Street,
5" Floor, North Tower
Peterborough, Ontario K9J 3C7
Attention: Mr. Jeremy Downe
Invasive Species Policy Advisor
Biodiversity Section
Toronto and Region
Conservation
Authority
Re: Developing Prevention and Response Plans for European water chestnut and water
soldier under the Invasive Species Act, 2015 (ERO #019-1163)
Thank you for the opportunity to comment on the Ministry of Natural Resources and Forestry's
(MNRF) Environmental Registry (ERO) posting on the proposed Prevention and Response Plans (the
Plans) for European water chestnut and water soldier under the Invasive Species Act, 2015.
The Toronto and Region Conservation Authority's (TRCA) is actively involved in invasive species
management strategy and implementation within our jurisdiction, in order to conserve natural
resources. TRCA conducts itself in accordance with the objects, powers, roles and responsibilities set
out for conservation authorities (CA) under the Conservation Authorities Act and the MNRF
Procedural Manual chapter on CA policies and procedures for plan review and permitting activities as
follows:
• A public commenting body under the Planning Act and Environmental Assessment Act;
• An agency delegated the responsibility to represent the provincial interest on natural hazards
under Section 3.1 of the Provincial Policy Statement;
• A regulatory authority under Section 28 of the Conservation Authorities Act;
• A service provider to municipal partners and other public agencies;
• A Source Protection Authority under the Clean Water Act,
• A resource management agency; and
• A major landowner in the Greater Toronto Area.
In these roles, and as stated in the Made -In -Ontario Environment Plan, CAs work in collaboration with
municipalities and stakeholders to protect people and property from flooding and other natural
hazards, and to conserve natural resources. TRCA's municipal partners rely on TRCA's assistance for
implementing the natural heritage policies of the Provincial Policy Statement by protecting and
restoring natural heritage resources through our mandate under the Conservation Authorities Act.
T: 416.661.6600 1 F: 416.661.6898 1 info@trca.on.ca 1 101 Exchange Avenue, Vaughan, ON L4K 5R6 I www.trca.ca
Government Pr000sal
We understand the government's current proposal is to develop Prevention and Response Plans for
European water chestnut (Traps natans) and water soldier (Stratiotes aloides), two prohibited invasive
species under the Invasive Species Act (ISA). The Act gives Ontario tools to prevent, detect, and
manage invasive species in the province. The draft Prevention and Response Plans are to enable
management and eradication activities which would otherwise be prohibited by regulation under the
ISA.
The proposed Prevention and Response Plans for European water chestnut and water soldier identify
persons authorized to implement the Plans, sets out the types of activities for which the Plans apply
and describes the conditions under which these persons will be permitted to possess, transport, and
deposit these species in Ontario. The Plans are intended to ensure that monitoring, control and
eradication activities do not further spread these species or introduce them to new areas.
General Comments
TRCA staff have reviewed the draft Prevention and Response Plans and generally support provincial
action to ensure the target species are prevented from spreading to new areas and are monitored,
controlled and eradicated effectively.
In TRCA's jurisdiction, invasive species management is an important consideration for ecological and
socio-economic reasons. Much of TRCA's jurisdiction contains highly altered landscapes and urban
areas with a high prevalence of invasive flora and fauna. TRCA and its partner municipalities have
repeatedly expressed a strong commitment to healthy terrestrial and aquatic ecosystems that provide
numerous ecosystem functions and services, which are critical for human health and well-being.
TRCA's The Living City Policies, 2014 (LCP) highlights TRCA's mission to work with our partners to
ensure that The Living City is built on a natural foundation of healthy rivers and shorelines,
greenspace and biodiversity, and sustainable communities. It acknowledges that the loss of native
plants and animals and the proliferation of invasive species are increasingly a threat to local
ecosystem function and that both land use and climate changes are expected to exacerbate these
issues. Accordingly, the LCP, used to guide staff review of proposed works either under the Planning
Act, Environmental Assessment Act or permits under TRCA's regulation under the Conservation
Authorities Act, contains policies to recommend a natural approach to the landscaping adjacent to
natural heritage systems with native, non-invasive and locally appropriate species.
Further, an action in TRCA's ten-year Strategic Plan (2013-2022) is to enhance our regional
watershed monitoring network so that we can identify new threats like invasive species and regularly
evaluate the effectiveness of our efforts to protect, manage, and restore greenspace. A priority of
TRCA's five-year update to the Strategic Plan is to share TRCA's research, data and leading science
to inform provincial initiatives such as this ERO posting.
TRCA has actively managed invasive species in its jurisdiction for many years to protect and enhance
ecological features and functions, to protect human health, and to engage and educate the public.
Included in these initiatives are monitoring, controlling, and treating invasive species, restoring
invasive species -dominated habitat on TRCA properties, and promoting general public awareness.
Some examples of this work include:
• community-based garlic mustard and burdock management projects,
• Asian long -horned beetle surveillance work,
• buckthorn, dog -strangling vine and Phragmites management at select sites,
Toronto and Region Conservation Authority 12
emerald ash borer hazard tree management, and
participating in the development of the Ontario Invasive Plant Council's "Grow Me
Instead" booklets.
With TRCA's roles and experience in mind, we offer the following feedback.
European water chestnut and water soldier Prevention and Response Plans
Roles and responsibilities
TRCA requests that the Plans' sections on "Resources to Support the Implementation of the
Prevention and Response Plan" provide specific guidance as to who is responsible for supporting the
Plans' implementation, including the roles of the Province, municipalities, conservation authorities,
and others.
Prevention and monitoring
TRCA recognizes these draft Prevention and Response Plans are the first issued by the Province
since the ISA came into effect. Critical tools for invasive species management, as recognized by the
ISA, include prevention, monitoring, and control and eradication activities. The current draft Plans
focus on control of invasive species after they have been introduced to an area. TRCA suggests the
Plans include a greater focus on measures to help prevent these invasive species from entering
additional parts of Ontario and practices to promote their early detection, per the Invasive Species
Act, Section 13(2). Prevention measures are often more cost-effective than implementing removal
measures after species have established in a new area. Monitoring activities enable early detection
and can reduce the required total cost and effort of control activities.
Reducing incidental spread
TRCA has identified incidental spread of invasive species as a major obstacle to effective invasive
species eradication in the province. Greater detail on appropriate biosecurity measures could be
provided for both authorized persons and those handling the species incidentally. The public and in
particular recreational water body users, (anglers and recreational water body users including
watercraft operators and others), should be educated on specific, appropriate measures to reduce
incidental transport and deposition of these invasive species.
Regarding authorized activities and measures the Province may take beyond providing guidance and
education, restrictions on recreational use of water bodies or areas within water bodies that European
water chestnut and/or water soldier have been detected may be appropriate in certain circumstances
to reduce incidental species transportation. Exceptions allowing continued professional operations,
(such as fisheries), in these areas could be accompanied by outreach campaigns and enforcement of
due diligence practices to reduce incidental spread of these aquatic invasive species caused by
professional activities. Geographic restrictions for recreational watercraft operation may reduce
instances of incidental possession and transport of European water chestnut and water soldier plants
that attach to a boat as a result of operating it in infested waters; this is not an offence under the
regulation prohibiting these species (O. Reg. 354/16) but nonetheless contributes to incidental
transport and spread of these species.
Detailed direction required to enhance compliance
Item (b) in the Authorized Activities section of each Plan states that the following activity may occur:
"deposit and release of [European water chestnut/water soldier] away from any body of water as
required to dispose of plants or plant parts that were removed from a body of water". Condition #5
states that once these plant species are removed from the water they, "must be disposed of or
destroyed in a manner that ensures that no part of the plant will re-enter the body of water or enter
into any other body of water." It would be helpful to provide more information on proper disposal
Toronto and Region Conservation Authority 13
methods to enable authorized persons to effectively dispose of collected European water chestnut
and water soldier plants and plant parts. For example, the Plans could state whether there are certain
facilities the plants should be taken to, whether the plants can be disposed of in a landfill or regular
municipal garbage, whether they can be incorporated into compost (noting that the seeds may
remain viable), or can be incinerated.
The Plans' Conditions sections should be expanded to include detailed direction on methods to
achieve compliance with the Plan. For example, condition #3 in each Plan states that, "All equipment
and/or watercraft used in infested waters during the course of water soldier prevention, monitoring, or
control or removal activities must be inspected and cleaned of any European water chestnut/water
soldier prior to movement overland." TRCA suggests including step-by-step instructions on how to
inspect equipment and watercraft, direction on what types of products (if any) should be used to
clean equipment and watercraft, whether the authorized person completing the inspection should
wear Personal Protective Equipment (PPE) and, if so, direction on appropriate PPE, and direction on
how to disinfect or dispose of PPE and other materials that the invasive plant may come in contact
with during the inspection and cleaning process (as appropriate). This information should also be
provided or referenced in the "Tips for controlling European water chestnut/water soldier" sections
under #4 Clean equipment and watercraft.
Other "Tips" that we recommend expanding to provide more detailed direction include tip #5 Dispose
of European water chestnut/water soldier carefully, and #6 Handle with care/Beware of the seeds. Tip
#5 could provide direction on whom should carry out disposal procedures (i.e., specify if this is limited
to authorized persons) and what unauthorized persons should do if they find one of these species on
their watercraft (such as recreational watercraft operators), how exactly the plants or plant parts
should be handled and disposed of, and how and to which government agency the sighting should be
reported. Tip #6 could provide direction on proper PPE to use during handling of the plants, if any is
required in addition to gloves.
Plan and data updates
TRCA recommends that the Plans affirm that any updates to or cancellation of the Plans will be
informed by the best available science and will be communicated to the public via appropriate media
mechanisms in order to reach relevant stakeholders. TRCA also requests information on how the
Province plans to disseminate to the public existing and forthcoming records of sightings and spread
of these species.
Herbicides
Regarding the application of herbicides (Water soldier Plan page 8, European water chestnut Plan
pages 9-10), TRCA is interested in whether the recommended herbicide (diquat) affects local fauna.
If there is potential for off -target fauna impacts, a characterization of local fauna should be required
prior to herbicide application in a water body and inform subsequent decisions on measures to avoid
or minimize off -target exposure and impacts. Such measures may include seasonal restrictions on
herbicide application, depending on the species present in a water body. Further, TRCA notes that
the Herbicide section of Other Considerations (page 10) in the European water chestnut Plan is
absent from the water soldier Plan, and we suggest including the same language in both Plans.
By -catch and off -target flora and fauna impacts
TRCA suggests that the Other Considerations sections of both Plans include guidance on how
authorized persons should deal with by -catch, such as amphibians and reptiles, that may be
inadvertently removed from the water during invasive species control activities. As well, the In -water
Work Timing Window Guidelines cited only consider relevant timelines for protection of fish, not
amphibians or reptiles. TRCA therefore recommends additional guidance be provided on avoiding
Toronto and Region Conservation Authority 14
impacts to amphibians through appropriate seasonal or other restrictions on control activities
targeting both invasive species. We also recommend the Plans provide additional guidance, as
appropriate, on avoiding impacts to off -target flora and fauna resulting from control measures.
As an aside, the second paragraph of page 3 of the draft Plan for European water chestnut
references water soldier when it should be referencing European water chestnut. Also, in the
European water chestnut Plan, page 5, b) ii., last sentence, appears to be incomplete.
TRCA Recommendations
In order to further the conservation, restoration and management of natural resources within our
watersheds, TRCA recommends that:
1) The Plans provide direction on the roles and responsibilities of the Province, municipalities,
conservation authorities, and others to better support Plan implementation.
2) Prevention measures used to avoid further spread and establishment of invasive species
across the province and measures to enable early detection of the species in new areas of the
province be expanded upon in the Plans, recognizing the general cost-effectiveness of
executing prevention and monitoring measures in concert with control measures, as compared
with an invasive species response regime that solely targets already -established invasive planl
populations.
3) The Plans provide more information on proper disposal, inspection methods and Personal
Protective Equipment (PPE) to enable authorized persons to effectively and safely detect and
dispose of collected European water chestnut and water soldier plants and plant parts, and
avoid contamination of other water bodies.
4) The Plans provide direction on the steps unauthorized persons should take when incidental
possession of European water chestnut and water soldier plants and plant parts occurs,
including direction on how to report species sightings.
5) Potential impacts of herbicides on in -water fauna be examined prior to herbicide application,
including through characterizations of fauna present in the water body and consideration of
measures to avoid or minimize off -target exposure.
6) The Plans provide direction to authorized persons on how to deal with by -catch, including
amphibians and reptiles, that may be inadvertently removed from the water during invasive
species control activities
7) The Plans provide direction on avoiding impacts to amphibians and reptiles that may occur
during mechanical invasive plant removal, including but not limited to seasonal restrictions on
invasive plant control activities. The Plans should also provide direction on avoiding impacts to
off -target flora and fauna during control activities.
Toronto and Region Conservation Authority 15
Thank you once again for the opportunity to provide feedback on the draft Prevention and Response
Plans for European water chestnut and water solider. Should you have any questions, require
clarification on any of the above, or wish to meet to discuss our remarks, please contact the
undersigned at 416.667.6290 or at iohn.mackenzie(cDtrca.ca.
Sincerely,
John MacKenzie, M.Sc.(PI) MCIP, RPP
Chief Executive Officer
BY E-MAIL
cc:
TRCA: Laurie Nelson, Director, Policy Planning
Sameer Dhalla, Director, Development and Engineering Services
Moranne McDonnell, Director, Restoration and Infrastructure
Toronto and Region Conservation Authority 16
RES.#A44/20 - TORONTO AND REGION CONSERVATION AUTHORITY
ADMINISTRATIVE OFFICE BUILDING PROJECT
Update on Toronto and Region Conservation Authority (TRCA)
Administrative Office Building Project and implications on the Project
schedule, budget and municipal approvals resulting from the COVID-19
pandemic.
Moved by: Anthony Perruzza
Seconded by: Jack Heath
IT IS RECOMMENDED THAT this staff report on the status of the Toronto and Region
Conservation Authority Administrative Office Building Project be received.
CARRIED
BACKGROUND
On February 27, 2015 Res. #A23/15 approved 5 Shoreham Drive as the preferred site for the
new TRCA administration building. On June 24, 2016 Res. #A85/16 approved a project budget
of $70M with $60M provided by participating municipalities and the remaining funds from land
disposition funds. On February 24, 2017 Authority Res. #A14/17 staff reported that all six of
TRCA's participating municipalities had approved the Project and the allocation of $60M in new
and existing capital funding. On May 25, 2018 Authority Res. #A79/18 staff reported that the
Minister of Natural Resources and Forestry granted approval to use $3,538,000 in disposition
proceeds from land sales, for a revised overall budget of $63,538,000 and, if possible, that the
disposition funds be used to reduce the overall term of the required financing. The revised
approved upper limit of the project budget of $60M was not increased at that time, as the
decision was made to wait until the tendering process was complete in mid -2019 to determine a
more accurate budget for the project.
On May 17, 2017 Authority Res. #83/17 TRCA awarded Jones Lang LaSalle Canada (JILL) as
its project managers and on August 30, 2017 Authority Res. #A156/17 awarded the integrated
design contract to a team led by ZAS Architects and Bucholz McEvoy Architects, to proceed
with the detailed design, planning and approvals, of the Project. On November 3, 2017 Authority
Res. #A216/17 awarded Eastern Construction Company Limited a Construction Management
Contract to provide pre -construction services throughout the design and procurement stages
along with construction management services for the construction of the new facility pending
agreement on the construction cost of the Project. This work includes the issuance of tenders to
construction trades.
On Friday, January 25, 2019 Board of Directors Res.#A19/19 staff issued an update on the
procurement of financial services and that the Canadian Imperial Bank of Commerce (CIBC) is
providing a term loan for the costs of the new administration building project up to $54,000,000.
On Friday, May 24, 2019 Board of Directors Res.#A78/19 staff provided an update on project
costing and a strategy to move to the tendering process and received direction from the Board
to report back on the total construction and Construction Management Services costs at the
time construction tenders are received.
On Friday January 24, 2020 Board of Directors RES. #A232/19 provided an update on the value
engineering process and that staff had authorized the project construction manager Eastern
Construction to award construction tenders to selected trades that align with the project budget,
that staff had authorized Eastern Construction to proceed with construction and finally, that staff
were authorized to issue Notices of Borrowing to the project financial services provider
according to the loan schedule based on the project cash flow.
RATIONALE
In light of the COVID-19 pandemic, the Ontario government has ordered the closure of all non-
essential businesses pursuant to its powers under the Emergency Management and Civil
Protection Act (the "Emergency Act"). On March 23, 2020, the Ontario government issued a list
of essential businesses that would be exempt from the closure order effective Tuesday, March
24 at 11:59 pm for at least 14 days. The Ontario government has since significantly expanded
the list of non-essential workplaces with the introduction of Ontario Regulation 119/20: Order
under Subsection 7.0.2(4) - Closure of Places of Non -Essential Businesses, which was declared
into law at 3 PM on April 3, 2020 (the "Essential Services Regulation"). On April 14, 2020 the
Ontario government extended the state of emergency another 28 days to May 12, 2020.
Site Closure
On April 3, 2020 Eastern Construction informed TRCA by email that they would be suspending
work on the project that day as they interpreted that the project no longer fell into the category of
essential services. Eastern Construction issued an official notice on April 6, 2020 of work
suspension but worked until April 6, 2020 to undertake the necessary construction and
maintenance activities to ensure safety at the temporarily closed project site.
Staff have engaged outside legal services to assist TRCA in reviewing Eastern Construction's
interpretation of the Ontario government's expanded list of non-essential workplaces is
appropriate and will respond if necessary. Further, TRCA and the project team with the
assistance of outside legal services will review Eastern Construction's interpretation of the
Construction Management contract to confirm if the Ontario government mandated closure of
non-essential businesses should be considered a Stop Work Order or a project delay due to
Force Majeure.
Schedule
RES. #A232/19 revised the project occupancy date to January 2022 due to Site Plan Approval
delay. However, considering the COVID-19 pandemic. the project occupancy date will depend
on the length of time the Government closure order will be in effect. In general, the project
approvals delay has been exacerbated by the closure of the City Civic Centres and the resulting
diminished capacity to process applications. The Site Plan Agreement remains outstanding and
with it the full building permit. TRCA has issued to the City of Toronto all the pre -approval Notice
of Approval Conditions (NOAC) including drafts of the shared use agreement with neighbouring
Tennis Canada and the lease agreement with City of Toronto. Unfortunately, both agreements
were not finalized before the City of Toronto closed all of its Civic Centres on March 19, 2020.
Fortunately, prior to the closure of non-essential activities the City Building Department issued a
Conditional Permit allowing for foundations to be constructed. To mitigate schedule risk an
above ground conditional permit has been submitted to the City but there has been no response
due to the Civic Centres being closed.
Milestone
Schedule
Dec. 18119 —
Baseline Schedule
Mar. 31/20 - Revised
Schedule
Notes
Site Plan
Feb. 2020
TBD
NOAC received Nov.
Approval
8/19 — all pre -approval
conditions submitted
Building Permit
Mar. 2020
Jun. 2020
Will depend on City
closure due to COVID-
Assuming the emergency order is not extended further Eastern Construction could resume
construction on May 12th, 2020 adding at minimum five weeks to the project schedule. This will
possibly shift the Occupancy to Feb. - Mar. 2022 and project Completion to Mar. - Apr. 2022. It
should be kept in mind that the delay to municipal approvals because of the City closure due to
COVID-19 may also affect the schedule if construction is delayed due to permitting.
Budget
The project costs remain within the overall budget of $65,538,000 but this may be challenged by
delays related to the COVID-19 pandemic and the suspension of construction. Staff are
discussing with the consultant team and outside counsel what, if any compensation, Eastern
Construction is entitled to under the construction management contract because of the delay.
Preliminary
Tender w/
19. Applied for above
itariance
Variance
grade Conditional
Value
w/ Value
o Tender
Permit.
Conditional
Jan. 2020
Mar. 30/20
Foundations only.
Permit
Construction
Jan. 2020 to Dec
Jan. 2020 to Feb.
Depending on site
2021
2022
closure due to COVID-19
Occupancy
Nov. 2021
Jan. 2022
Depending on site
$40,945,268
$41,661,627
$716,359
closure due to COVID-19
Completion
Jan. 2022
Feb 2022
Depending on site
$0
Conditions GC
closure due to COVID-19
Assuming the emergency order is not extended further Eastern Construction could resume
construction on May 12th, 2020 adding at minimum five weeks to the project schedule. This will
possibly shift the Occupancy to Feb. - Mar. 2022 and project Completion to Mar. - Apr. 2022. It
should be kept in mind that the delay to municipal approvals because of the City closure due to
COVID-19 may also affect the schedule if construction is delayed due to permitting.
Budget
The project costs remain within the overall budget of $65,538,000 but this may be challenged by
delays related to the COVID-19 pandemic and the suspension of construction. Staff are
discussing with the consultant team and outside counsel what, if any compensation, Eastern
Construction is entitled to under the construction management contract because of the delay.
Preliminary
Tender w/
Post Tender
itariance
Variance
Project
Value
w/ Value
o Tender
Explained
Budget
Engineering
Engineering
NI Value
(VE) (Nov.
(VE) (Mar.
Engineeri
28, 2019)
31,2020)
ng (VE)
Wny 2R
Construction Cost
$35,608,539
$40,945,268
$41,661,627
$716,359
A
General
$5,362,573
$6,187,565
$6,187,565
$0
Conditions GC
Construction
$860,569
$934,308
$948,599
$14,219
B
Management
CM Fee
Construction
$3,418,791
$2,341,620
$2,377,442
$35,818
C
Contingency
Total
$45,250,472
$50,408,765
$51,175,233
$766,468
Construction
Costs
Consultant Fees
$4,021,133
4,297,883
4,297,883
$ -
Permits
$624,697
$626,658
$626,658
$
Furniture/Fittings
$1,550,000
$1,750,000
$1,750,000
$
and Equipment
Relocation Costs
$2,026,697
$2,026,697
$2,026,697
$
Project M mt.
$2,575,000
$1,871,325
$1,871,325
$
Financing Costs
$2,515,265
$1,940,016
$1,940,016
$
Non -Recoverable
$1,037,736
$1,066,993
$1,066,993
$
HST 1.76%
Soft Cost
$399,000
$399,000
$399,000
$
Contingency
Total Costs
$60,000,000
$64,387,337
$65,153,806
$766,469
Total Available
$60,000,000
$65,538,000
$65,538,000
$
D
Funds
Additional
$ -
$1,150,663
$384,194
Contingency
Funds
Variance Explanations:
A. The post -tender increase in construction costs is a result of trades being unable to meet
preliminary value engineering estimates. Further, the tender for a portion of the mechanical
system (water augmented transparent air ducts — "waterwalls°) received only one bid at
three times the estimated cost. This item is being retendered to reduce costs through a
competitive bidding result.
B. The construction management fee is calculated as 1.9% of the total construction cost per
Eastern Construction's successful CM proposal.
C. The construction contingency is calculated at 5% of total construction cost, excluding the
construction management fee.
D. Total Available Funds includes $2M to reflect a grant from the National Research Council's
Green Construction Through Wood program, which was confirmed after the July 26, 2019
Board of Directors meeting. This funding is in addition to the $60M contributed by TRCA's
partner municipalities and $3,538,000 contributed by the Province through approved land
dispositions.
TRCA has entered the construction phase of the project with contingencies totaling $3,160,636.
This total represents 5.2% of total project costs of $59M (includes construction, consultant fees,
permitting fees, FF&E and relocation). According to TRCA's consultants, a 5% contingency on
construction projects is deemed to be conservative from a risk perspective.
Although total funding available for the project totals $65,538,000, TRCA will continue to work to
bring the project budget to the previously reported $64,387,337. TRCA with the construction
manager and design team are looking at the following cost savings measures:
1. Waterwalls — The watenaall tender produced only one bid at $2M which was $1.25M
over the estimate. This item is in the process of being retendered. It is expected that a
more competitive process will yield better results. The tender will be closing in May.
2. Geo — Exchange System — It is expected that a switch to an open loop ATES system
may yield savings in the range of $200k to $300K. By the end of May or beginning of
June 2020 the savings for this item will be more apparent. TRCA is pursuing funding
from governmental agencies to assist with the development of an ATES system.
3. Engineered Fill and Backfilling — The budget carries a cash allowance of $319k for this
work. A savings found with this work occurring in the summer months allowing the
project to use native materials rather than importing materials due to wet weather. This
item should be clearer in June 2020
4. De -watering — A cash allowance of $103K for dewatering excavation will not likely be
required now that excavation has been pushed out further into dryer weather. Same as
engineered fill and backfilling whether this item is required will be clearer by June.
Construction Loan
Board of Directors Resolution #A145/19 authorized staff to issue Notices of Borrowing to the
project financial services provider, Canadian Imperial Bank of Commerce (CIBC), according to a
loan schedule based on the project cash flow. TRCA and the project financial services provider,
CIBC, worked together to develop a quarterly amortization schedule for a $54,000,000 term
loan that best reflects the payment schedule from TRCA's partner municipalities, commencing
on January 4, 2022 and ending on January 2, 2047, representing a period of 25 years.
TRCA worked with the construction manager to develop an expected loan drawings schedule,
between January 2020 and January 4, 2022, when the $54,000,000 construction loan converts
to long-term debt. The decision by the construction manager to suspend construction will alter
this schedule, which is expected to have financial ramifications on the project.
101 Exchange Lease Agreement
RES. A232/19 authorized staff to extend the lease at 101 Exchange Avenue as required to
ensure overlap with the building occupancy period.
As previously reported TRCA requested and received from the landlord a lease extension at
101 Exchange from the original schedule of July 2021 to the end February 2022 at the current
lease rate. Given the delay related to the suspension of construction, a further lease extension
will be required. Preliminary discussions have occurred, and the expectation is that an extension
will be acceptable. Staff will continue to work with the facilities manager of 101 Exchange
Avenue to ensure a smooth transition.
DETAILS OF WORK TO BE DONE
The construction manager will be pursuing further cost savings into May 2020. The site plan
approval process is nearing completion with TRCA providing the City the necessary
documentation as outlined in the Notice of Approval Conditions to finalize the Site Plan
Agreement. TRCA will continue to contact staff through the COVID-19 City closures to attempt
to mitigate further approvals delay. TRCA staff will continue the furniture, fixtures and equipment
procurement process starting with furniture layout and the staff relocation strategy.
Report prepared by: Jed Braithwaite, extension 5345
Emails: jed.braithwaitela�trca.ca
For Information contact: Jed Braithwaite, extension 5345
Emails: led, bra ithwa ite(a)trca.ca
Date: April 15, 2020
MINUTES OF SPECIAL EXECUTIVE COMMITTEE MEETING, HELD ON FEBRUARY 21,
2020
RES.#A45/20 -
Moved by:
Seconded by:
MINUTES
Paul Ainslie
Ronald Chopowick
THAT the Minutes of Special Executive Committee Meeting, held on February 21, 2020 be
received.
CARRIED
MATERIAL FROM EXECUTIVE COMMITTEE MEETING #1/20, HELD ON MARCH 13, 2020
Meeting Minutes
Section I — Items for Board of Directors Action
RES.#A46/20 - REQUEST FOR EXCHANGE OF TORONTO AND REGION
CONSERVATION AUTHORITY -OWNED LAND
Report back on the request by the owner to acquire TRCA-owned lands
located at the rear of 99 Wakelin Court, City of Vaughan, Regional
Municipality of York, Humber River watershed via an exchange of land to
resolve a historical encroachment from the previous owner (CFN 61572)
(Executive Committee RES.#83/20).
Moved by: Linda Jackson
Seconded by: Gino Rosati
WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request
from the owner of 99 Wakelin Court, City of Vaughan, for TRCA to enter into an exchange
of land in order to resolve a historical encroachment by the previous owner;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the owner of 99 Wakelin
Court in this instance and proceed with the proposed exchange of land in a higher risk
area of the same property;
THEREFORE, LET IT BE RESOLVED THAT TRCA enter into an exchange of land with the
owner of 99 Wakelin Court on the following basis:
1. The owner of 99 Wakelin Court will convey to TRCA a parcel of land containing
0.02 hectares (0.05 acres) more or less, of vacant lands, located at the rear of 99
Wakelin Court;
2. TRCA will convey to the owner of 99 Wakelin Court a parcel of land containing
0.02 hectares (0.05 acres) more or less of vacant lands abutting the rear of 99
Wakelin Court;
3. Market value of the exchange will be determined by an AACI accredited appraiser
and if TRCA lands are of greater value than the 99 Wakelin Court lands the owner
be required to pay TRCA the difference; and
4. All legal, survey, appraisal and all other costs including any fees required for the
Planning Act approvals are to be paid by the owner of 99 Wakelin Court.
THAT the owner of 99 Wakelin Court be responsible for any Planning Act approvals
required for the land exchange;
THAT TRCA receive conveyance of the land free from encumbrance, subject to existing
service easements;
THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest
possible date;
THAT said conveyance be subject to the approval of the Minister of Environment,
Conservation and Parks in accordance with Section 21(2) of the Conservation Authorities
Act, R.S.O. 1990, Chapter C.27, as amended;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
RES.#A47/20 - CITY OF RICHMOND HILL
Proposed disposition of TRCA lands to address an earlier request from
the City of Richmond Hill, for a conveyance of TRCA-owned lands located
on west side of Bayview Avenue and north of Bethesda Side Road, in the
City of Richmond Hill, Regional Municipality of York, required for
municipal park infrastructure, Humber River watershed (CFN 59703)
(Executive Committee RES.#84/20).
Moved by: Paul Ainslie
Second by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request
from the City of Richmond Hill for the conveyance of TRCA-owned lands located on the
west side of Bayview Avenue and north of Bethesda Side Road, in the City of Richmond
Hill, Regional Municipality of York, required for municipal park infrastructure, Humber
River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with the City of Richmond
Hill in this instance;
THEREFORE, LET IT BE RESOLVED THAT a parcel of TRCA-owned land containing 1.23
hectares (3.05 acres), more or less, of land required for municipal park infrastructure,
being Part Lots 6 & 7, Concession 2, in the City of Richmond Hill, Regional Municipality
of York, be conveyed to the City of Richmond Hill;
THAT consideration be the nominal sum of $2.00; all legal, survey and other costs to be
paid by the City of Richmond Hill with support in the form of an agreement to service
nearby TRCA properties;
THAT the City of Richmond Hill provide a new waterline to service Lake St. George Field
Centre from Bethesda Side Road to the main water chamber to the satisfaction of TRCA
staff;
THAT the City of Richmond Hill fully indemnify TRCA from any and all claims from
injuries, damages or costs of any nature resulting in any way, either directly or indirectly,
from this conveyance;
THAT an archaeological investigation be completed, with any mitigation measures being
carried out to the satisfaction of TRCA staff, at the expense of the City of Richmond Hill;
THAT said conveyance be subject to notice to the Ministry of Environment, Conservation
and Parks in accordance with Section 21(2) of the Conservation Authorities Act, R.S.O.
1990, Chapter C.27, as amended;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
RES.#A48/20 - REGIONAL MUNICIPALITY OF YORK
Receipt of a request from the Regional Municipality of York, for a
permanent easement on Toronto and Region Conservation Authority -
owned lands located on the north side of Rutherford Road and west of
Keele Street, in the City of Vaughan, Regional Municipality of York,
required for Rutherford Road widening from Jane Street to Basaltic Road,
Don River watershed (CFN 62916) (Executive Committee RES.#85/20).
Moved by: Paul Ainslie
Second by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is in receipt of a request
from the Regional Municipality of York for a permanent easement on TRCA-owned lands
located on the north side of Rutherford Road and west of Keele Street, in the City of
Vaughan, Regional Municipality of York, required for Rutherford Road widening from
Jane Street to Basaltic Road, Don River watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with Regional Municipality of
York in this instance;
THEREFORE, LET IT BE RESOLVED THAT a permanent easement on TRCA-owned land
containing 0.032 hectares (0.0788 acres), more or less, of vacant land, required for
Rutherford Road widening from Jane Street to Basaltic Road, said lands being Part of Lot
16, Concession 4 and designated as Parts 25 and 34 on Registered Plan 65R-37129, in
the City of Vaughan, Regional Municipality of York, be granted to the Regional
Municipality of York;
THAT consideration be the nominal sum of $2.00 with all legal, survey and other costs to
be paid by the Regional Municipality of York;
THAT the Regional Municipality of York is to fully indemnify TRCA from any and all
claims from injuries, damages or costs of any nature resulting in any way, either directly
or indirectly, from this granting of a permanent easement or the carrying out of
construction within the permanent easement;
THAT a landscape plan be prepared for TRCA staff review and approval, in accordance
with existing TRCA landscaping guidelines at the expense of the Regional Municipality of
York;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by
Regional Municipality of York prior to the commencement of construction;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
RES.#A49/20 - GREENLANDS ACQUISITION PROJECT FOR 2016-2020
Acquisition of property located north of Kingston Road and west of
Church Street, municipally known as 10 Elizabeth Street, in the Town of
Ajax, Regional Municipality of Durham, under the "Greenlands Acquisition
Project for 2016-2020," Flood Plain and Conservation Component,
Duffins Creek watershed (CFN 61019) (Executive Committee
RES.#86/20).
Moved by: Paul Ainslie
Second by: Ronald Chopowick
THAT 903 square metres (.22 acres), more or less, of vacant land, located north of
Kingston Road and west of Church Street, said land being Part of Lot 16, Concession 2
designated as Part 3 on draft Registered Plan by IBW Surveyors dated August 20, 2018,
municipally known as 10 Elizabeth Street, in the Town of Ajax, Regional Municipality of
Durham, be purchased from the landowner;
THAT the purchase price be $2.00;
THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the
land free from encumbrance, subject to existing service easements;
THAT the firm Gowling WLG, be instructed to complete the transaction at the earliest
possible date and all reasonable expenses incurred incidental to the closing for land
transfer tax, legal costs, and disbursements are to be paid by TRCA;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
RES.#A50120 - TORONTO ZOO TRIPARTITE AGREEMENT
Update on discussions with the Toronto Zoo, City of Toronto and Parks
Canada relating to the Tripartite Agreement and required work by Parks
Canada, City of Toronto and other partners to finalize the Tripartite
Agreement and facilitate the design of the Rouge Gateway and Welcome
Centre for the Rouge National Urban Park in the City of Toronto
(Executive Committee RES.#87/20).
Moved by: Paul Ainslie
Second by: Ronald Chopowick
THAT the staff report providing an update on discussions with the Toronto Zoo, City of
Toronto and Parks Canada relating to the Tripartite Agreement and other Zoo related
matters be received;
AND FURTHER THAT the requirement to report back annually on the state of the
Tripartite Agreement be rescinded and that staff be directed to report back once the
Tripartite Agreement has been finalized.
CARRIED
Section IV - Ontario Regulation 166/06, As Amended
RES.#A51/20 - ONTARIO REGULATION 166/06, AS AMENDED
Moved by: Paul Ainslie
Second by: Ronald Chopowick
THAT item 10.2 - Section IV — Ontario Regulation 166/06, as amended, contained in
Executive Committee Minutes #1/20, held on March 13, 2020, be received.
CARRIED
RES.#A52/19 -
Moved by:
Second by:
NEW BUSINESS
Paul Ainslie
Ronald Chopowick
THAT item 10.3, contained in Executive Committee Minutes #1/20, held on March 13, 2020,
be received.
CARRIED
Item 10.3
TRCA'S INTERIM PANDEMIC PLAN
(Executive Committee RES.#812/20)
ELECTRONIC MEETING PARTICIPATION
(Executive Committee RES.#813/20)
2020 TRIECA CONFERENCE CANCELLATION
(Executive Committee RES.#814/20)
MAPLE SYRUP FESTIVAL AND MARCH BREAK PROGRAMS
(Executive Committee RES.#815/20)
ADJOURNMENT
ON MOTION by Ronald Chopowick, the meeting adjourned at 12:17 p.m., on April 24, 2020.
Jennifer Innis
Chair
/am
John MacKenzie
Secretary -Treasurer