HomeMy WebLinkAbout04-20-Minutes_Board_of_Directors_2020-05-22Toronto and Region
_ Conservation
Authority
Board of Directors Meeting #4/20 was held via videoconference, on Friday, May 22, 2020
pursuant to section C.12, subsections (3) and (4), of the TRCA's Board of Directors
Administrative By -Law. The Chair Jennifer Innis, called the meeting to order at 9:39 a.m.
PRESENT
Jennifer Innis
Chair
Jack Heath
Vice -Chair
Paul Ainslie
Member
Kevin Ashe
Member
David Barrow (in: 9:55 -11:00 a.m.)
Member
Ronald Chopowick
Member
Dipika Damerla
Member
Joanne Dies
Member
Jennifer Drake (in: 9:45 a.m.)
Member
Paula Fletcher
Member
Chris Fonseca (out: 11:00 a.m.)
Member
Xiao Han
Member
Gordon Highet
Member
Linda Jackson
Member
Maria Kelleher
Member
Cynthia Lai
Member
Mike Layton (out: 11:00 a.m.)
Member
Basudeb Mukherjee
Member
Michael Palleschi
Member
James Pasternak
Member
Steve Pellegrini
Member
Anthony Perruzza
Member
Rowena Santos
Member
Don Sinclair
Member
Connie Tang (in: 9:55 -11:00 a.m.)
Member
Estair Van Wagner
Member
ABSENT
Shelley Carroll Member
Gino Rosati Member
The Chair recited the Acknowledgement of Indigenous Territory.
MINUTES
Moved by: Cynthia Lai
Seconded by: James Pasternak
THAT the Minutes of Meeting #3/20, held on April 24, 2020, be approved.
CARRIED
DELEGATIONS
5.1 Mr. Marcus van lerssel, Commodore, Aquatic Park Sailing Club, in regard to agenda
item 8.1 Tommy Thompson Park.
5.2 Jennifer King, Legal Counsel, Aquatic Park Sailing Club, in regard to agenda item 8.1
Tommy Thompson Park.
5.3 Mr. Tim Kirkwood, Member At Large, Aquatic Park Sailing Club, in regard to agenda
item 8.1 Tommy Thompson Park.
5.4 Mr. Peter Epstein, Outer Harbour Sailing Club, in regard to agenda item 8.1 Tommy
Thompson Park.
RES.#A54/20 - DELEGATIONS
Moved by: Paula Fletcher
Seconded by: James Pasternak
THAT above -noted delegations 5.1 - 5.4 be added to the agenda for the May 22, 2020
Board of Directors meeting.
CARRIED
RES.#A55/20 -
Moved by:
Seconded by:
DELEGATIONS
Paula Fletcher
Maria Kelleher
THAT above -noted delegations 5.1 - 5.4 be received.
CARRIED
CORRESPONDENCE
7.1 An email dated May 21, 2020 from Mr. Ian Sturdee, Member, Tommy Thompson Park
User Group, in regard to Item 8.1 Tommy Thompson Park.
7.2 A letter dated May 21, 2020 from Mr. John Carley and Mr. Garth Riley, Co -Chairs,
Friends of the Spit, in regard to Item 8.1 Tommy Thompson Park.
7.3 An email dated May 21, 2020 from Mr. Charles Bruce -Thompson, Past President,
Toronto Field Naturalists, in regard to Item 8.1 Tommy Thompson Park.
7.4 An email dated May 21, 2020 from Mr. Michael Holloway, Tommy Thompson Park User
Group Cycling Representative, Co -Chair of the Ward 14 Bikes, in regard to Item 8.1
Tommy Thompson Park.
7.5 An email dated May 21, 2020 from Ms. Ann Gray, in regard to Item 8.1 Tommy
Thompson Park.
RES.#A56/20 - CORRESPONDENCE
Moved by: Paula Fletcher
Seconded by: Anthony Perruza
THAT above -noted correspondence items 7.1 — 7.5 be added to the agenda for the May
22, 2020 Board of Directors meeting.
CARRIED
RES.#A57/20 - CORRESPONDENCE
Moved by: Paula Fletcher
Seconded by: Anthony Perruza
THAT above -noted correspondence items 7.1 — 7.5 be received.
CARRIED
Item 7.
Alisa Mahrova
From:
Sent: Thursday, May 21, 2020 1:50 PM
To: Alisa Mahrova
Subject: Request for Delegation Board Meeting May 22, 2020
To: Chair of the Board of Directors
RE: Aquatic Park Sailing Club Lease Renewal at Tommy Thompson Park
By tabling the Aquatic Park Sailing Club (APSC) lease renewal for Board approval, before seeking input from Tommy
Thompson Park User Group (TTPUG), TRCA is ignoring its self imposed mandate to consult with stakeholder groups i.e.
TTPUG.
The possibility of expanded vehicle access by APSC has been a concern of TTPUG members and the issue has been raised
several times at TTPUG meetings. The belief has been that APSC interprets the 1995 TTP Master Plan differently than
how it is actually worded and is attempting to gain expanded vehicle access.
In this situation we received notice on May 20 of the lease renewal being tabled on May 22, obviously allowing no time
for TTPUG to comment. At issue is whether or not TRCA is interested in continuing to seek input from TTPUG. If they are,
then they have a responsibility to respect that commitment. If not, disband TTPUG.
Thank you.
Ian Sturdee
Member Tommy Thompson Park User Group
Tommy Thompson Park Volunteer Naturalist since 2003
More than 15,000 hours contributed
Item 7.2
Friends of the Spit
P.O. Box 51518
2140A Queen Street East
Toronto ON M4E 3V7
infoOfrie ndsofthesp i t. ca
w .friendsofthespitxa
BY E-MAIL and MAIL
21 May 2020
Mr. J. MacKenzie, Chief Executive Officer
Toronto and Region Conservation Authority
Re: Item 8.1 Tommy Thompson Park (TTP)
Aquatic Park Sailing Club — License Agreement Renewal City of Toronto
(CFN 24403)
Dear John;
Yesterday afternoon, May 20, 2020, we were informed of the above -noted item regarding
the Aquatic Park Sailing Club's lease, and its inclusion on the Board's agenda for
tomorrow's meeting, May 22, 2020.
To say that this is short notice to a stakeholder is an understatement.
All TRCA staff and executives, and City of Toronto staff, associated with TTP/The Spit, as
well as the local City councillor, have been well aware that the issue of private vehicular
access at TTP/The Spit has been of great concern to our organization as well as many other
user groups and stakeholders. We, as a stakeholder, were not consulted regarding this issue.
The provisions of the lease, as outlined, run contrary to the approved TTP Master Plan and
Environmental Assessment (Revised). This Master Plan and EA was fashioned through
countless hours of stakeholder consultation, including APSC representatives, and clearly
states that there be no private vehicular access during park -open hours. It is our
understanding and belief that neither the City nor the TRCA can enter into a lease which
abrogates the provisions of that Master Plan and Environmental Assessment. The hours
allocated in the proposed lease for APSC vehicular access contravene the Master Plan and
EA.
Item 7.2
Mr. J. MacKenzie, CEO, TRCA
Item 8. 1, Tommy Thompson Park.
Aquatic Park Sailing Club Lease Renewal (CFN 24403)
21 Mav 2020
As the notice for this Board meeting has been extraordinarily short, and as this proposed
lease's vehicular access provisions do not reflect the Master Plan and EA, we ask that the
Board defer its decision, to allow full discussion with and comment by Friends of the Spit,
other Tommy Thompson Park User Group members, and other stakeholders.
Yours sincerely,
FRIENDS OF THE SPIT
per:
signed on "hard" copy
JOHN CARLEY, Co -Chair
(416)930-6987
14
GARTH RILEY, Co -Chair
(416) 319-4502
Celebrating 43 years: since 1977, Friends of the Spit has been advocating for the entire
Leslie Street Spit and Baselands to be a car -free Public Urban Wilderness.
cc Ms. J. Innes, Chair, Board of Directors, Toronto and Region Conservation Authority
Board members, TRCA
Ms. A. Mahrova, TRCA, for distribution to appointed Board members
Mr. M. Tolensky, CFOO, TRCA
Ms. M. McDonnell, director, Restoration and Infrastructure, TRCA
Mr. R. Ubbens, director, Parks and Culture, TRCA
Ms. J. Romoff, General Manager; Parks, Forestry & Recreation, City of Toronto
Tommy Thompson Park User Group members
Other interested parties
Item 7.3
Alisa Mahrova
From: Charles Bruce -Thompson
Sent:
Thursday, May 21, 2020 4:29 PM
To:
Andrea Chreston
Cc:
Alisa Mahrova
Subject:
TRCA Board of Directors meeting May 22
Dear Andrea,
In light of the upcoming TRCA Board of Directors meeting, and specifically the agenda item
"Aquatic Park Sailing Club — License Agreement Renewal City of Toronto", as a longstanding
member of the TTPUG I would like to reiterate my opposition to any consideration of allowing
private vehicles on the Spit during park -open hours. I won't enumerate the reasons why I feel I
need to state my opposition as I'm sure these are blindingly obvious and have been presented
frequently and articulately at TTPUG meetings and in correspondence
Failure to abide by the provisions of the TTP Master Plan and Environmental Assessment would
render the usefulness and effectiveness of the TTPUG completely redundant in my opinion
Yours sincerely
Charles Bruce -Thompson
Past President
Toronto Field Naturalists
1
Item 7.4
Alisa Mahrova
From: Michael Holloway
Sent: Thursday, May 21, 2020 4:44 PM
To: Alisa Mahrova
Cc: Tamara Nahal; Gerry Brown; John Carley, Ian Sturdee; Margaret Kelch; Charles Bruce -Thompson; Don
Johnston; Colin Biggin; Bob Kortright; Garth Riley
Subject: Renewal of the License Agreement with the Aquatic Park Sailing Club (APSC) Inbox x
Toronto and Region Conservation Authority Board of Directors
Jennifer Innis, Chair of the Board of Directors,
RE: TRCA Board of Directors meeting on 22 May 2020 Agenda Item, SECTION I - ITEM 8.1 Aquatic Park Sailing Club — License
Agreement Renewal City of Toronto (CFN24403); Referring to the list of 'restricted motor vehicle access' protocols starting with the
second bullet point on page 5 (of 54) down to the bottom of that page (https://pub-
trca.escribemeetinas.com/FileStream.ashx?Documentld=57541:
My name is Michael Holloway, I have been on the Tommy Thompson Park User Group (TTP -UG) since 2012 representing local cyclists
in Ward 14 Toronto -Danforth as a leader of the Cycle Toronto affiliated, local ward cycling advocacy group , Ward 14 Bikes (formerly
Ward 30 Bikes).
In keeping with the TTP Master Plan, I believe it is in the interest of all park user's safety, and in the interest of preserving habits, that
motor vehicle use on the spit be reduced as much as possible going forward - to that I end I suggest mitigating motor vehicle use by
members of the Aquatic Park Sailing Club in the following ways:
1 suggest that their Shuttle be a human -powered (possibly with electric assist) Bicycle Bus (a few as possible motor powered
vehicles allowed on the spit);
1 suggest that security patrols that are to be allowed at all hours be conducted by foot or by bicycle (ie. only Heavy Load*
transport be conducted by motor vehicle).
*'Heavy Load' defined: capacity of a bicycle with trailer is approximately 100kg (221 lbs.); so only loads over 100kg can be transported
by motor vehicles on the spit.
Please note I am in favour of all the other wording pertaining to restricted motor vehicle access in the document.
Cc'd Cycle Toronto Community Engagement Manager, Tamara Nahal; Ward 14 Bikes Co -Chair, Gerry Brown, and, members of the
TTP -UG, John Carley, Ian Sturdee, Margaret Kelch, Charles Bruce -Thompson, Don Johnston, Colin Biggin, Bob Kortright, Garth Riley.
Michael Holloway
TTP -UG Cycling Representative,
Co -Chair of the Ward 14, Cycle Toronto affiliated cycling advocacy group,
Ward 14 Bikes
Item 7.5
Alisa Mahrova
From:
Alisa Mahrova
Sent:
Thursday, May 21, 2020 5:19 PM
To:
Alisa Mahrova
Subject:
TTP Items on TRCA Board of Directors Meeting Agenda May 22, 2020
From: Ann Gray
Sent: Thursday, May 21, 2020 4:59 PM
Subject: Re: TTPUG: TTP Items on TRCA Board of Directors Meeting Agenda May 22, 2020
Dear Andrea,
Thank you for updating members of TTPUG on the upcoming Agenda for the Spit Board Meeting tomorrow.
A few years ago there was an expansion of Toronto Waterfront usage to include allowing recreational fishermen to fish
along the waters of The Spit. This was an adjustment for previous users of the Spit, but we all adjusted to this change.
Once we recover from the many waves of COVID-19 , it will be important to wisely use and share all the parks in the city
, including The Spit.
The Aquatic Park Sailing Club , which was incorporated in 1976, has been an excellent steward of the Spit. Whenever, a
cleanup is required or trees need to be encircled with chicken wire to protect them from being felled by Beavers, we all
remember that the members of the APSC pitched in to help us.
With respect to the rationale of excluding the APSC from the Spit, I have not heard nor read any articulation of reasons
for exclusion of APSC since their incorporation in 1976. All parks need to be used for the enjoyment of walkers,
nature lists,photographers, recreational fishermen, and sailors and the need for following the rules by all who enjoy and
use the Spit.
I do hope that the Board of The Spit will, in their wisdom, extend the Licence Agreement Renewal for APSC and to abide
by the rules, present or future.
Sincerely,
Ann C. Gray
Section I — Items for Board of Directors Action
RES.#A58/20 - TOMMY THOMPSON PARK
Renewal of the License Agreement with the Aquatic Park Sailing Club
(APSC) for use of Toronto and Region Conservation Authority (TRCA)
lands located at Tommy Thompson Park (TTP), City of Toronto, for the
operation of one hundred (100) swing moorings for sailing craft and for
the purpose of storage racks for oars and dinghies, loading and landing
docks, garbage disposal bins, toilet facilities, small shelter for equipment,
clubhouse facilities, a work boat and other water maintenance facilities
and a car park area (CFN 24403).
Moved by: Paula Fletcher
Seconded by: James Pasternak
WHEREAS TRCA is in receipt of a request from the APSC to renew the License
Agreement for the use of TRCA lands located at TTP for the operation of one hundred
(100) moorings for sailing craft and for the purpose of storage racks for oars and
dinghies, loading and landing docks, garbage disposal bins, toilet facilities, small shelter
for equipment, clubhouse facilities, a work boat and other water maintenance facilities
and a car park area, for a term of five (5) years and seven (7) months ending on July 31,
2025, City of Toronto;
WHEREAS APSC has been in operation at this site since 1976;
AND WHEREAS extensive discussions and negotiations between TRCA and APSC have
occurred to address access issues of concern to TRCA, APSC and TTP stakeholders;
THEREFORE LET IT BE RESOLVED THAT TRCA renew the License Agreement with
APSC for the use of 8.9 hectares (21.992 acres), more or less, said land being Part of
Water Lot Location CL 3528 in front of Marsh Lands Patented to the City of Toronto May
18,1880;
THAT the License Agreement with APSC be subject to the following terms and
conditions:
That the term of the License Agreement be for five (5) years and seven (7)
months, expiring on July 31, 2025;
That consideration be as follows:
January 1, 2020 to December 31, 2020 the sum of $14,647.50 plus HST,
January 1, 2021 to December 31, 2021 the sum of $15,379.88 plus HST,
January 1, 2022 to December 31, 2022 the sum of $16,148.87, plus HST,
January 1, 2023 to December 31, 2023 the sum of $16,956.31 plus HST,
January 1, 2024 to December 31, 2024 the sum of $17,804.12 plus HST, and
January 1, 2025 to July 31, 2025 the sum of $10,858.07 plus HST.
That all rental payments are payable in two equal installments due on May 1 and
September 1 of each year, with the exception of the last year, when the payments
will be due on January 1 and May 1 respectfully;
That the APSC shall also be responsible for the costs of using the Licensed Area
including costs of gate keys, maintenance, waste removal, security, Licensee's
insurance premiums and any and all realty taxes, including local improvement
charges;
• That the APSC, its members and invitees may access the Licensed Area,
including the car park by (i) motor vehicle(s) operated by the APSC members;
and (ii) the APSC shuttle service consisting of a golf cart designated by the
APSC as the shuttle service vehicle (APSC Shuttle), subject to the terms and
conditions in the License Agreement;
• That TRCA has no liability or responsibility with respect to the APSC Shuttle;
• That APSC shall ensure that all operators of the APSC Shuttle are active
members of the APSC and are trained to respect the public who utilize the main
road through TTP;
• That restricted motor vehicle access is permitted from April 1 to November 30
of any calendar year (sailing season) during the following times:
a. on weekdays (Saturday, Sundays and statutory holidays excepted) at any
time;
b. on Saturdays, Sundays and statutory holidays, before 9:00 am and after
6:00 pm;
c. one (1) motor vehicle may be used at any time for emergency purposes and
may be stationed in the car park, including on Saturdays, Sundays and
statutory holidays;
d. one (1) motor vehicle may be used by the operator of the APSC Shuttle and
stationed in the car park on Saturdays, Sundays and statutory holidays
between 9:OOam and 6:OOpm for the purpose of accessing the APSC
Shuttle parked in the car park;
e. APSC Shuttle service is permitted at any time.
• Outside of the Sailing Season, motor vehicle access is not permitted, subject to
the following exceptions:
f. APSC is permitted to conduct security patrols of the Licensed Area using
motor vehicles designated by the APSC;
g. Notwithstanding anything to the contrary contained herein, the APSC
its members and invitees are permitted motor vehicle access to the
Licensed Area during public hours on three (3) consecutive
weekends during the spring ("Load In") and three (3) consecutive
weekends during the fall ("Load Out") of every calendar year of the
License Term and any extensions thereof for necessary preparatory
work in connection with its use of the Licensed Area. The TRCA and
APSC shall on an annual basis coordinate and agree by March 1, both
parties acting reasonably, on the Load In and Load Out weekends.
Parking during this period will be in a designated area determined by
TRCA and the APSC, both acting reasonably, for security purposes;
h. Access by vehicle or the APSC Shuttle to and from the Licensed Area
shall only be made through the main entrance gates to Tommy
Thompson Park;
any other terms and conditions deemed appropriate by the TRCA staff and
solicitor.
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
Aquatic Park Sailing Club (APSC) was established in 1976 on Peninsula D and Embayment C
at Tommy Thompson Park (TTP), during the initial planning phase for a public park on the
Leslie Street Spit landform. The Leslie Street Spit has divided ownership with approximately half
the lands owned by TRCA (officially Tommy Thompson Park) and the remaining lands owned
by the Province of Ontario and leased to PortsToronto (formerly Toronto Habour
Commissioners and Toronto Port Authority) for lakefilling operations. The Revised Tommy
Thompson Park Master Plan and Environmental Assessment (hereafter Master Plan) was
approved in 1995 and includes provisions for APSC.
APSC is located approximately 2 km from the park entrance and occupies an area of land and
water totaling approximately 8.9 ha (Attachment 1). TRCA has held a License Agreement with
the APSC since interim management of the park began in 1985. The APSC is permitted a
maximum of 100 mooring balls and the APSC allows three (3) memberships per mooring ball.
Club facilities include a clubhouse, dinghy compound, oar shed, mechanical shed and two
washrooms. The Club is off -grid and uses a generator and solar power. The TTP Master Plan
includes provisions for the APSC with clear access stipulations. The Master Plan states:
"At present, the Aquatic Park Sailing Club (APSC) with 100 swing moorings is located
at Tommy Thompson Park in Embayment C with temporary facilities on land at the
eastern end of the Embayment. The Plan maintains this sailing club in Embayment C
along with a land base area consistent with the environmental integrity of the site. The
APSC land base includes approximately 1 ha area for limited emergency vehicle and
van shuttle parking, storage building area, and clubhouse."
"The concept for access to Tommy Thompson Park can be summarized as follows. No
private vehicle access beyond the vehicle access control point at the base of the park,
subject to the exceptions on vehicular access outlined below:
o Maintain the existing roadway along the neck and out the endikement to the
lighthouse area for use by park service vehicles, emergency vehicles, and
construction vehicles to maintain the shoreline, and potentially a park
transportation service. The park transportation is subject to the approval of
Metropolitan Toronto.
o Maintain an access road from the environmental education/shelter/washroom
facility to APSC for emergency vehicles, and APSC shuttle van. The current
restricted private vehicle access arrangements for APSC will remain in effect until
the park is officially opened and operated by Metropolitan Toronto, which is
assumed to be after completion of the lake filling and resolution of the remaining
property ownership. These current arrangements for APSC include 1) private
vehicles access on specific weekends to accommodate haul out and launch dates;
2) private vehicle access before and after public hours (Saturday, Sunday and
Holidays); and 3) private vehicle access Monday through Friday while the site is
operated by the Toronto Harbour Commissioners for the lake filling and
construction activities."
The current arrangements described in the Master Plan are for interim management, where
public access was only permitted on weekends and holidays from 9:00 am to 6:00 pm. The
Master Plan did not contemplate prolonged lakefilling operations, a delay in land transfer, or
phased park opening. PortsToronto ceased daily lakefilling activities in 2016 and no longer has
a continuous presence on site during business hours, however lakefilling operations may
resume at any time. Coinciding with the discontinuance of PortsToronto activities, in 2016 TTP
was officially opened to the public on weekday evenings (4:00 to 9:00 pm), and TRCA
requested that APSC prepare to reduce private vehicle access during this public access period.
However, according to the Master Plan and EA Conditions of Approval, "any change to the
private vehicle access policy" would be considered a major modification to the plan and would
require an amendment to the EA. Negotiations between TRCA staff, APSC members and legal
counsel representing the APSC facilitated at times by the local Councillor took place in 2018-
2020 and has resulted in a mutual arrangement being reached as to the terms and conditions of
the License Agreement that addresses access to TTP by the APSC and its members as follows:
• the APSC, its members and invitees may access the Licensed Area, including the
car park by (i) motor vehicle(s) operated by the APSC members; and (ii) the APSC
shuttle service consisting of a golf cart designated by the APSC as the shuttle
service vehicle (APSC Shuttle), subject to the terms and conditions in the License
Agreement;
• TRCA has no liability or responsibility with respect to the APSC Shuttle;
• APSC shall ensure that all operators of the APSC Shuttle are active members of the
APSC and are trained to respect the public who utilize the main road through TTP;
• restricted motor vehicle access is permitted from April 1 to November 30 of any
calendar year (sailing season) during the following times:
a. on weekdays (Saturday, Sundays and statutory holidays excepted) at any time;
b. on Saturdays, Sundays and statutory holidays, before 9:00 am and after 6:00 pm
c. one (1) motor vehicle may be used at any time for emergency purposes and may
be stationed in the car park, including on Saturdays, Sundays and statutory
holidays;
d. one (1) motor vehicle may be used by the operator of the APSC Shuttle and
stationed in the car park on Saturdays, Sundays and statutory holidays between
9:OOam and 6:OOpm for the purpose of accessing the APSC Shuttle parked in the
car park;
e. APSC Shuttle service is permitted at any time.
• Outside of the Sailing Season, motor vehicle access is not permitted, subject to the
following exceptions:
a. APSC is permitted to conduct security patrols of the Licensed Area using motor
vehicles designated by the APSC;
b. Notwithstanding anything to the contrary contained herein, the APSC, its
members and invitees are permitted motor vehicle access to the Licensed
Area during public hours on three (3) consecutive weekends during the
spring ("Load In") and three (3) consecutive weekends during the fall ("Load
Out") of every calendar year of the License Term and any extensions
thereof for necessary preparatory work in connection with its use of the
Licensed Area. TRCA and APSC shall on an annual basis coordinate and
agree by March 11 both parties acting reasonably, on the Load In and Load
Out weekends. Parking during this period will be in a designated area
determined by TRCA and the APSC, both acting reasonably, for security
purposes;
c. Access by vehicle or the APSC Shuttle to and from the Licensed Area shall
only be made through the main entrance gates to Tommy Thompson Park.
RATIONALE
The Tommy Thompson Park Master Plan has been approved and includes the APSC. With
additional shoreline work contemplated and lake filling required it is uncertain as to when the
site can be in a condition for it to be transferred in its entirety to the TRCA or City of Toronto.
This period of time required for works, due diligence and property transfers will likely exceed five
years. A 5 -year license will allow the APSC to forecast their budget and fee schedule more
effectively. A 5 -year term will also allow TRCA to forecast revenue for TTP and reduce the
administration cost associated with negotiating and executing the licence on an annual basis.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategiesset forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
Strategy 5 — Foster sustainable citizenship
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
Revenue generated from this license will be used to offset costs for TRCA in managing TTP.
Report prepared by: Lori Colussi, extension 5303
Emails: lori.colussi(&trca.ca
For Information contact: Lori Colussi, extension 5303
Emails: Iori.colussiCaD-trca.ca
Date: May 4, 2020
Attachments: 1
Attachment 1: Sketch of Licensed Area
t,.
'r
i,
LgRpw li�q�r "/.
IRBM1[1
�q S
Embayment B
\1
Embayment D
E
y Spine Road
Cell 1
Wetland
_ Cell
Wetland
Cell
gMcl.nuery16.1018 7
4e.mtl ba: Inbm.lien Mwegmea
Road
wrrBal N Imm. r.att y mmm. a aam. Tn.
iRCPdmmponYbliry MvronoromlNou
MNetl. euantl rcWna MerlgMromMeaungma
wnatlow ta'ryameviNw[nekta Fe lur[M1v
inlpm.4nn.bw! tM tl.[e m M u m.q pl we
mM.tttM1eTRCP4a Oepxmm�L1<I6i 661fi600.
0.[hoPM1ata ikrt BmeBdulima0016
weaprwiaetl by MXRFi.c OueenthFtvb On[via
RES.#A59/20 - TOMMY THOMPSON PARK CORMORANT MANAGEMENT
STRATEGY
Biennial Update. To provide an update on 2018-2019 Double -crested
Cormorant management at Tommy Thompson Park and to request
approval to continue annual implementation of the current strategy until
any significant changes are required.
Moved by: Steve Pellegrini
Seconded by: Jack Heath
THAT staff be directed to continue annual implementation of the TTP Cormorant
Management Strategy until any significant changes are required;
THAT staff be directed to work with the Ontario Ministry of Natural Resources and
Forestry, the Canadian Wildlife Service, and any other required regulatory agency to seek
approval for the annual management strategy for cormorants at TTP;
THAT staff be directed to continue to actively participate in local, regional and binational
committees/working groups addressing the management and protection of colonial
waterbirds;
AND FURTHER THAT staff report back to the TRCA Board of Directors regarding the
management of Double -crested Cormorants at Tommy Thompson Park when significant
changes to the management strategy are required.
CARRIED
BACKGROUND
Tommy Thompson Park (TTP) is located on the Leslie Street Spit, on the central Toronto
waterfront. It is a wilderness park that supports diverse communities of flora and fauna,
including the world's largest breeding colony of Double -crested Cormorants (hereafter
cormorants). The ecological significance of the site is apparent through designations of
Environmentally Significant Area and globally significant Important Bird Area.
Cormorants are colonial waterbirds that nest in high densities along the shores of freshwater
lakes within the Great Lakes region. Reportedly an abundant species in North America pre -
European settlement, cormorants have experienced two population crashes since the 1800s,
and recently made a remarkable recovery from near extirpation in the Great Lakes following the
impacts of DDT on their reproductive success. Cormorants are a controversial species; like the
American Beaver they are ecosystem engineers — their acidic guano negatively impacts the
health of the trees used for nesting, ultimately killing trees and thereby altering the habitat
available for other species and resulting in aesthetic implications, and they also have a
reputation for impacting local fisheries through their voracious appetites and successful foraging
skills. At TTP the only true impact of cormorant nesting is on tree health resulting in the
reduction of habitat available for other species. Based on more than 30 years of TRCA coastal
monitoring data along the Toronto waterfront, there is no evidence that cormorants have
impacted the local fishery.
Cormorant nesting behaviour varies between colonies — they are a tree nesting species in some
areas and ground nesting in others; at TTP they are both. Cormorants began nesting in
Cottonwood trees at the tip of Peninsula B at TTP in 1990 and the breeding population
expanded rapidly, colonizing the forested Peninsulas A and C by 2000. A ground nest colony
developed in a deforested area at the tip of Peninsula B in 2002. TRCA has monitored the
nesting population of cormorants at TTP since 1990 by conducting annual nest census at peak
breeding in June and a tree health survey in late -August. This data has allowed careful tracking
of the expansion of the colony and the associated effects on tree health. In 2007 TRCA
identified that 24% of the forest cover at TTP had been negatively impacted by nesting
cormorants and initiated a process to develop the TTP Cormorant Management Strategy. The
Strategy was developed through a transparent process with extensive consultation with a
Cormorant Advisory Group comprised of experts, academics, naturalists and local stakeholders.
The 2008 Cormorant Management Strategy was approved by the Authority Board as per
Resolution #A110/08, and until 2014 TRCA reported to the Authority Board annually on the
management strategy:
In 2009 as per Resolution #A22/09,
In 2010 as per Resolution #A23/10,
In 2011 as per Resolution #A49/11, and
In 2012 as per Resolution #A19/12.
At Authority Meeting #11/13, held on January 31, 2014, Resolution #A226/13 was approved, in
part, as follows:
... THAT staff report back to the Authority bi-annually regarding the management of Double -
crested Cormorants at Tommy Thompson Park or more frequently should the Strategic
Approach be significantly changed;...
And TRCA reported to the Authority Board in 2016 as per Resolution #A15/16, and in 2018 as
per Resolution #A40/18 which was approved as follows:
...THAT staff report and present to the Authority on a biennial basis regarding the management
of Double -crested Cormorants at Tommy Thompson Park or more frequently should the
management strategy be significantly changed.
TRCA has been managing cormorants at TTP since 2008 without any significant changes in the
strategy. Given the demonstrated success of the management strategy, staff recommend only
reporting back to the Board of Directors if a significant change in the strategy is required.
TTP Cormorant Management Strategy Overview
The goal of the TTP Cormorant Management Strategy is to achieve a balance between the
continued existence of a healthy, thriving cormorant colony and the other ecological,
educational, scientific and recreational values of TTP. The objectives of the Strategic Approach
are to:
1. Increase public knowledge, awareness, and appreciation of colonial waterbirds;
2. Deter cormorant expansion to Peninsula D;
3. Limit further loss of tree canopy on Peninsulas A, B and C; and
4. Continue research on colonial waterbirds in an urban wilderness context.
The management strategy at TTP is a unique approach to managing cormorants because unlike
most other colonies, TRCA spatially manages the nesting distribution of cormorants using non-
lethal deterrent techniques. Through the exclusion of human presence during breeding season,
cormorants are encouraged to nest in 'Conservation Zones' on the ground within previously
deforested areas of Peninsulas A and B (Attachment 1). Staff discourage cormorants from
nesting in healthy tress within 'Deterrent Zones' by implementing targeted management
activities (Attachment 2) including:
• Inactive nest removal — tree nests are removed from Deterrent Zones before April;
• Pre -nesting deterrents — cormorants are discouraged from tree nesting in Deterrent
Zones through an escalating scale of measures in April and May;
Active nest removal — newly placed nest material is removed from trees in Deterrent
Zones in May and June. This conservative technique follows the protocol for estimating
embryo development prepared by the Humane Society of the United States to ensure
nests with developed embryos are not removed; and
Post -breeding deterrents — though identified as a management technique, it has not
been undertaken as cormorants have not roosted in trees in the Deterrent Zones during
the post -breeding period.
Increasing public knowledge, awareness and appreciation of colonial waterbirds is an important
objective of the Management Strategy. A viewing blind is installed at the edge of the tree
nesting colony on Peninsula C to provide visitors the opportunity to see nesting cormorants;
staff provide interpretation of the colony at various public events and to numerous corporate,
academic and naturalist groups on park tours or off-site presentations; and staff respond to
media and documentary film requests regarding cormorants.
The non-traditional management strategy has been recognized as ground -breaking among
colonial waterbird researchers and managers. In collaboration with York University, TRCA
published a paper in the June 2018 volume of the scientific journal Waterbirds on the unique
management strategy at TTP (McDonald, K., R. Toninger, A. Chreston, 1. R. Fledmann and G.
S. Fraser. 2018. Living with Double -crested Cormorants (Phalacrocorax auritus): a Spatial
Approach for Non -lethal Management in Toronto, Canada. Waterbirds 41: 208-220). The
strategy has also influenced the management of cormorants at other nesting colonies.
In December 2018 the provincial government announced proposed legislation changes to the
Fish and Wildlife Conservation Act to allow cormorants to be hunted from March 15 through
December 31 in Ontario as a population management tool. TRCA submitted comments on the
proposal while it was available on the Environmental Registry of Ontario. In December 2019
legislation was passed to allow for regulations to be developed that would permit cormorant
flesh to spoil. Based on municipal firearm regulations, the TTP colony should not be directly
impacted by the proposed hunting season, however, nesting pressure may increase as
cormorants potentially relocate from other breeding colonies where they are being hunted in the
Lake Ontario basin.
Management results for 2018 and 2019 are outlined in the following sections. Detailed annual
'Management Summary Reports' describing management actions are available upon request.
2018 Cormorant Management Results
Following the impacts of flooding in 2017 which resulted in a 24 per cent decline in the ground
nesting population, the ground nesting population increased by 37 per cent in 2018,
representing 72 per cent of the overall TTP nesting population. Tree nesting declined by 23 per
cent and cormorants were effectively deterred from expanding their nesting range into Deterrent
Zones. Overall, in 2018 the population increased by 13 per cent.
# nests
%
change
from
2017
Ground nesting 10,506
37
Tree nesting 4,009
-23
Total 14,515
13
2019 Cormorant Management Results
Record high water levels in Lake Ontario resulted in impacts to ground nesting areas in 2019
with a 17 per cent decrease in ground nesting. Flooding increased nesting pressure on trees
within the Deterrent Zones and implementation of deterrent techniques was complicated by
flooding as staff were required to wear chest waders to navigate through deep water while
avoiding underwater trip hazards. Additional staff were deployed to deter cormorants on
Peninsula D and Embayment A. By peak breeding season, staff were successful at preventing
cormorants from nesting on Peninsula D, however removal of all tree nests in Embayment A
was not possible.
Ultimately, the overall population declined six per cent in 2019. The proportion of the overall
population represented by ground nesting dropped to 64 per cent. Tree nesting increased by 23
per cent as a result of flooding, which is approximately a third of the tree nesting increase that
occurred during the 2017 flooding.
# nests
change
from
2018
Ground nesting 8,681
-17
Tree nesting 4,933
23
Total 13,614
-6
RATIONALE
A high level of concern has been expressed regarding cormorant populations and their
management. Concerns have been raised from both sides, on the one hand calling for
management and the preservation of forest canopy, and on the other hand for protection of the
birds and their nesting colonies. TRCA has an obligation to manage TTP as directed by the
Tommy Thompson Park Master Plan as approved under the Environmental Assessment Act.
To meet the intent of the Master Plan, staff believe that there is a strong rationale for
undertaking the management of cormorants at TTP.
Since November 2007, TRCA has involved stakeholders and the public in assessing the need
for management and developing a strategy for cormorants at TTP. Generally, throughout the
process there has been agreement that some form of management is appropriate, providing
that the methods are humane to cormorants and do not affect other wildlife.
Population monitoring data collected since the initiation of the Cormorant Management Strategy
in 2008 show that the management techniques are a successful means of meeting and
maintaining the goal and objectives of the strategy. Despite new challenges including regular
flooding events and the proposed cormorant hunting legislation, TRCA is confident that
continued implementation of the strategy (Attachment 2) will preserve the ecological integrity of
the adjacent habitats and ecosystems within TTP, while maintaining a healthy, thriving
cormorant colony.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
Strategy 7 — Build partnerships and new business models
Strategy 8 — Gather and share the best sustainability knowledge
FINANCIAL DETAILS
Funds are available in the Tommy Thompson Park Interim Management account 210-19 in the
approved 2020 budget. These municipal funds are being leveraged to secure additional funding
in 2020-2021. Over the 2018-2019 ad 2019-2020 federal funding cycles, a total of $47,500 was
secured for TTP Cormorant Management through the Remedial Action Plan (RAP) Governance
Fund. This funding has been critical to successful management given the high Lake Ontario
water levels and flooding in recent years. Continued high lake levels and flooding in the future
will require additional funding to successfully manage cormorants at TTP.
DETAILS OF WORK TO BE DONE
A suite of techniques will be utilized in an integrated and adaptive approach to help achieve the
original goal and objectives of the Double -crested Cormorant Management Strategy from 2008.
Attachment 2 — Table 2 provides an overview of the strategy.
Increase Public Knowledge, Awareness and Appreciation
• Maintain TRCA cormorant webpage, including compelling images of cormorants;
• Conduct interpretive tours for school and interest groups, and at TTP special events;
• Maintain opportunities to view colonial waterbirds with viewing blinds and platforms;
• Present information at conferences and forums;
• Respond to media and documentary film inquiries; and
• Participate in working groups on colonial waterbirds.
Inactive Nest Removal
• Remove nests from target trees within Cormorant Deterrent Zones during the winter,
prior to the breeding season.
Enhanced Ground Nesting
• Avoid daytime disturbance to the ground nesting areas during the breeding season so
that cormorants are not deterred from nesting on the ground; and
• Deploy straw bales to the ground nesting areas at the beginning of the nesting season to
encourage nesting.
Pre -nesting Deterrents
• Utilize the suite of deterrence techniques on an increasing scale of activity to prevent
expansion of tree nesting within the Deterrent Zones;
• Prevent cormorant nesting on Peninsula D via the operation of the TTP Bird Research
Station and public access; and
• Monitor the effects of deterrent activities on the cormorants to ensure they are effective
and monitor the effects on non -target species to ensure they do not have an adverse
impact.
Post -breeding Deterrents
• Utilize the suite of deterrence techniques on an increasing scale of activity to prevent
cormorant tree roosting in the Deterrent Zones.
Monitoring, Research and Reporting
• Undertake annual nest census for colonial waterbirds;
• Conduct annual tree health surveys within Deterrent Zones;
• Continue to collaborate with York University and other interested researchers on colonial
waterbird research; and
• Complete annual management summary reports.
• Meet with Cormorant Advisory Group to review data and discuss whether changes are
required.
Report prepared by: Andrea Chreston, extension 5362;
Emails: andrea.chreston(cDtrca.ca
For Information contact: Karen McDonald, extension 5248; Andrea Chreston, extension
5362
Emails: karen.mcdonald(a)_trca.ca; andrea.chreston(aD_trca.ca
Date: April 3, 2020
Attachments: 2
Attachment 1: Cormorant Management Zones at Tommy Thompson Park
Attachment 2: TTP Cormorant Management Matrix
Attachment 1: Cormorant Management Zones at Tommy Thompson
Peninsula A Peninsula B
/ Y
� J
4
take Ontario
7
a sss zsa sm m
Pen��sul.o ❑
Legend
M Conservation Zane
W Deterrent Zone
.;,t Ground Nest
` ^t Tree Nest
Attachment 2: TTP Cormorant Management Matrix
Peninsula A
Peninsula B
Peninsula C
Peninsula D
Inactive Nest Removal
(prior to the breeding
season
Enhanced Ground
Nesting
Pre -nesting Deterrents
Post -breeding Deterrents
as required
RES.#A60/20 - SCARBOROUGH WATERFRONT PROJECT AND SCARBOROUGH
BLUFFS WEST 2020 UPDATE
Update on the status of the Scarborough Waterfront Project and
proposed Scarborough Bluffs West Individual Environmental Assessment
(EA) project.
Moved by: Paul Ainslie
Seconded by: Jack Heath
WHEREAS Toronto and Region Conservation Authority (TRCA), in partnership with the
City of Toronto, undertook an Individual Environmental Assessment (EA) to create a
system of greenspaces along the Lake Ontario shoreline between Bluffer's Park and East
Point Park in Toronto that will respect and protect the significant natural and cultural
features of the Bluffs, enhance the terrestrial and aquatic habitat, and provide a safe and
enjoyable waterfront experience (the Scarborough Waterfront Project);
WHEREAS TRCA received approval from the Authority on July 28, 2017 (Resolution
#A137/17) to submit the Draft Scarborough Waterfront Project EA Report to the Ministry
of Environment and Climate Change (MOECC) for public and agency review, and to
proceed to City of Toronto Executive Committee and City of Toronto Council to request
approval to formally submit the Final Scarborough Waterfront Project (SWP) EA Report,
once completed, to the Ministry for public and agency review;
WHEREAS TRCA received approval from the City of Toronto Executive Committee on
May 14, 2018 and City of Toronto Council on May 22, 23 and 24, 2019 (Resolution EX34.5)
to submit the Final SWP EA Report to the MOECC, now MECP, for formal Ministry Review
in June 2018;
WHEREAS TRCA received funding of $4.895 million over two years as part of the 2019
City Budget process to refine the preliminary overall costing for the entire SWP EA and
report to the City for the City Council -approved stage 2 stage gating review, as well as
complete the detailed design of the West Segment, which includes the funding required
for the Brimley Road South multi -use trail detailed design and construction;
WHEREAS TRCA received approval for the Final SWP EA Report from the Minister of
Environment, Conservation and Parks (MECP) on November 5, 2019;
WHEREAS TRCA at the Board of Directors meeting held on November 29, 2019 an update
on the status of the Scarborough Bluffs West Individual EA project and any required
approvals was requested to be brought back to the Board of Directors for their
consideration in the Spring of 2020;
THEREFORE, LET IT BE RESOLVED THAT the following update on the Scarborough
Waterfront Project and Scarborough Bluffs West Individual EA be received;
THAT staff proceed with the finalization and release of two RFPs supporting the detailed
design of the West Segment of the Scarborough Waterfront Project;
THAT the CEO be delegated authority to award these RFPs if the procurement process is
complete and it falls within the summer hiatus period;
AND FURTHER THAT staff continue to work with City of Toronto staff and senior levels
of government to secure budget to allow initiation of the proposed Scarborough Bluffs
West Individual EA project and to advance construction of the Scarborough Waterfront
Project in partnership with the City of Toronto.
CARRIED
BACKGROUND
Scarborough Waterfront Project
TRCA, in partnership with the City of Toronto, initiated a study in 2014 under the Environmental
Assessment Act (EA Act) with a vision to create a system of public greenspaces along the Lake
Ontario shoreline between Bluffer's Park and East Point Park, which respect and protect the
significant natural and cultural features of the Bluffs, enhance terrestrial and aquatic habitat, and
provide a safe and enjoyable waterfront experience.
In May 2018, TRCA received approval from the City of Toronto Executive Committee, and
subsequently City Council (Resolution EX34.5), to submit the final Scarborough Waterfront
Project Environmental Assessment (EA) to the Ministry of Environment and Climate Change
(MOECC) for formal review. TRCA was also directed by Council to report back with preliminary
costing for the design and implementation of each project area shoreline segment (West,
Central and East), subject to a favourable decision from MOECC, and that cost estimates for
the erosion control components, multi -use trail and the waterfront access, along with any
funding eligibility criteria, be provided by TRCA as part of the completed stage -gate 3 class 3
costing and detailed design of each of the three shoreline segments.
On November 6, 2019 TRCA received a letter from Minister Yurek, approving the Scarborough
Waterfront EA. Earlier in 2019, City Council approved funding of $4.895M to advance the West
Segment detailed design process and to start construction on the Brimley Road South
pedestrian improvements. TRCA, in continued partnership with the City of Toronto, is
proceeding with the detailed design of the West Segment of the Scarborough Waterfront Project
in 2020. Given the necessity to improve pedestrian and cyclist safety along Brimley Road, the
Brimley Road South multi -use trail work is the primary priority in the West Segment detailed
design process.
Scarborough Bluffs West
At City Council Meeting #11 on December 9 and 10, 2015, Resolution EX10.23 was passed
which directed City Council, through the Capital Budget, to include a $2 million Toronto Water
Capital Reserve contribution towards the Scarborough Bluffs West Individual EA, cash flowed
over the 2 or 3 -year life of the project. This resolution would see the initiation of an Individual EA
similar to the Scarborough Waterfront Project for the shoreline from Bluffer's Park west to R.C.
Harris Water Treatment Plant. As the Scarborough Waterfront Project was in the middle of a
comprehensive consultation process at this time a mutual decision between TRCA and the City
was made to delay the new EA until the active planning process was complete to eliminate
potential public confusion.
In order to best position the launch of the future Scarborough Bluff West EA, baseline studies
and environmental monitoring in support of the project were completed between 2016 and 2019
and include: terrestrial and aquatic ecology surveys; coastal condition studies; and terrestrial
and marine archaeology studies. Under direction received from Toronto Water in February
2020, additional baseline studies and environmental monitoring work have been put on hold
until further discussions with appropriate City of Toronto divisions is undertaken to determine
next steps for the EA.
RATIONALE
Scarborough Waterfront Project
TRCA, in partnership with key divisions of the City is proceeding with detailed design of the
West Segment. The West Segment boundaries are between Bluffer's Park and the start of the
Meadowcliffe Drive Erosion Control Project. Work will include additional engineering and
technical analysis, as well as construction phasing and costing for the following components:
the proposed expanded headlands at Bluffer's Park and Meadowcliffe, the expansion of
Bluffer's Park Beach, and a multi -use trail through the Segment, including improvements to
Brimley Road South and construction of a separated multi -use trail along the east side of
Brimley, south of Barkdene Hills to Bluffer's Park. Given the necessity to improve pedestrian
and cyclist safety along Brimley Road, the Brimley Road South multi -use trail work will be a first
priority in the West Segment detailed design process. To best facilitate the planning process
moving forward, the detailed design exercise for the West Segment has been split into two
Request for Proposal (RFP) processes: Brimley Road South and SWP West Shoreline.
TRCA staff have circulated the draft scope of work for detailed design of the Brimley Road
South multi -use trail to City Transportation, Toronto Water and Parks, Forestry and Recreation
divisions. A conference call with key city leads was held on May 11, 2020 to review comments
submitted. It is expected that sign off from key City staff on the RFP will be obtained by May
15th, 2020 which will allow for subsequent issue of the document to prospective consultants.
The second RFP for the SWP West Shoreline is currently being drafted with a target to have
City review completed by the end of May and a formal release of the document the week of
June 8, 2020. The results of both RFP processes will be presented at the September 2020
Board of Directors meeting.
Scarborough Bluffs West
TRCA continues to receive requests from Councillors and members of the public with respect to
improving access to the shoreline west of Bluffer's Park. When the SWP EA was completed
TRCA re-initiated discussions with Toronto Water to confirm funding and other details so as to
advance the Scarborough Bluffs West Individual EA project. The City Council allocation of $2
million for the EA was not based on a detailed workplan and is inadequate to complete the
planning process. Draft budgets and workplans informed by the SWP process estimate $3.5
million will be needed to complete the EA. As Toronto Water is only committed by City Council
for $2 million, they have asked that that project be put on hold until a multi -divisional meeting led
by City Finance be undertaken to discuss next steps.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 3 — Rethink greenspace to maximize its value
Strategy 5 — Foster sustainable citizenship
FINANCIAL DETAILS
Scarborough Waterfront Project
The total capital investment for the SWP is estimated to be $170 million, over a 12 -year
implementation period, and additional post -implementation reporting and monitoring. Given the
conceptual level of detail considered in the EA, and annual inflation over the course of the
Project, the estimated capital investment includes a healthy contingency of 50%. The total
capital investment will continue to be refined during the detailed design process, as concepts
are further refined.
As per the staff report submitted to the May 14, 2018 City Executive Committee, and
subsequently to City Council on May 22, 23 and 24, 2018, this Project will follow the City
Council -approved "stage gate" capital planning and approval process. The work undertaken to
date confirms the conceptual feasibility of the Project (stage 1). As part of detailed design,
TRCA staff will undertake the work required to establish preliminary design and costs
associated with the second stage of the process. Detailed costs for each Segment of the Project
that would identify the eligibility of funding sources (i.e. erosion control separate from waterfront
access and environmental enhancements) is not yet available. Confirmation of these cost
estimates requires the 30% detailed design to be completed at the third stage of the City's stage
gating process (stage gate 3, class 3 costing) in conjunction with relevant City Programs.
As part of the 2019 Budget process, TRCA received funding of $4.895 million to complete the
refined preliminary costing of the entire Project, as well as detailed design of the West Segment,
which includes the funding required for the Brimley Road South multi -use trail detailed design
and construction. Funds are being tracked through the 204-17 account code.
Scarborough Bluffs West
City Council has authorized $2 million for the Scarborough Bluffs West Individual EA supported
by Toronto Water. To date $1.382 million has been spent from the $2 million allocation leaving
$0.618 million remaining. Toronto Water did an inter -budget transfer of $1 million of these funds
to the SWP to complete the EA and $382,000 was spent to undertake annual baseline
monitoring (2016 — 2019) in support of the future West EA. It is anticipated that the Scarborough
Bluffs West EA would cost approximately $3.5 million from launch to completion over a period of
three or more years based on the experience with the SWP. This means a gap of $2.882 million
in funding currently exists. This project has been included on the unmet needs list for the City of
Toronto capital budget since 2016.
Toronto Water has indicated that they cannot move forward with an agreement with TRCA to
undertake the EA until discussions with other key City divisions are undertaken to discuss the
funding gap. Toronto Water has also currently not allocated funds in 2020 to support continued
baseline monitoring for the future West EA. TRCA has submitted an estimate of $48,145 to
Toronto Water for the continuation of the fisheries monitoring program in 2020 and is awaiting a
decision on whether this work will move forward. The continuation of this work will help to
ensure the EA is in the best possible state for a future launch.
DETAILS OF WORK TO BE DONE
• As requested by City Council, TRCA will refine the preliminary overall costing for the
entire SWP and report to the City for the City Council -approved stage 2 stage gating
review. TRCA has requested a meeting with key City divisions to confirm how project
costing and cash flows are to be established and refined to maintain alignment with the
City's stage -gate process for a report back to Council.
TRCA anticipate the results of the two RFP process for the SW P West Segment to come
to the September 2020 Board of Directors for approval. Following the completion of the
West Segment detailed design phase (fall 2021), an update on the status of the SWP
will be brought forward to the Board of Directors to present the refined construction
costing along with a request for authorization to proceed with any next steps requiring
Board approval.
• TRCA staff will continue to engage the City in discussions around proceeding with the
formal initiation of the Scarborough Bluffs West Individual EA and the continuation of
baseline fisheries monitoring in 2020. An update on the status of this EA will be brought
to the Board of Directors when direction is obtained from the City of Toronto.
• TRCA continues to highlight the opportunity for senior government support of this project
is in our correspondence to federal and provincial officials. When a relevant funding
program or intake process is initiated by senior levels of government, TRCA plans to
submit relevant elements of the Scarborough Waterfront Project as part of that program.
Report prepared by: Lisa Turnbull, extension 5645
Emai Is: lisa.tu rn bu II(&trca.ca
For Information contact: Lisa Turnbull, extension 5645
Emai Is: lisa.tu rn bu II(&trca.ca
Attachments: 1
Attachment 1: Scarborough Waterfront Project and Scarborough Bluffs West Study Area
MUdU IIFIUFIL 1. 01-11 wyn wainumin n�eu cnu am u0muyu 0imis vvem
401
creek
a��c �S� Thornton East
%i ,,Segment I,.
PINEE central
Segment '
., Scarborough
Waterfront
vest' �.,' Project
gment, Y
,
,
P'
Lake Ontario
Scarborough
Bluffs
West
Toronto and Region
Conservation
Authority
r -
PEEL
TORONTO
SITE
�.xe o�reno
RES.#A61/20 - BROCK SOUTH FILL PLACEMENT
Award of fill placement contract associated with Request for Proposal
#10033336 for the Brock South Lands located in the Town of Ajax,
Regional Municipality of Durham.
Moved by: Steve Pellegrini
Seconded by: Jack Heath
WHEREAS the Brock Lands were negatively impacted by historic extraction and filling
activities;
WHEREAS the Brock Lands are identified within the TRCA Board of Directors and Town
of Ajax endorsed Greenwood Conservation Area Master Plan as a focus for restoration
through the strategic placement of clean fill, restoration plantings and other restoration
work, some of which is already underway;
WHEREAS the funds for receiving the clean fill at the Brock Lands are required to be set
aside exclusively for project costs and implementation of the Greenwood Conservation
Lands Master Plan, including future recreation, restoration and habitat enhancement of
the property, as approved by the Authority on June 24, 2016 (Resolutions #A88/16 and
#A89/16);
THEREFORE LET IT BE RESOLVED THAT Toronto and Region Conservation Authority
(TRCA) enter into an agreement with TACC Construction Ltd. for the supply and
placement of 250,000 cubic metres of clean surplus topsoil to restore TRCA-owned lands
at Brock South, at a fee of $5.50 per cubic metre, which totals $1,375,000 which could
potentially be expanded to an import volume of 300,000 cubic metres subject to
discretion of TRCA;
THAT, in addition to the tipping fee, TACC Construction Ltd. will be responsible for the
costs of sediment control, topsoil placement, grading and seeding the site with a basic
cover crop;
AND FURTHER THAT the appropriate TRCA officials be authorized and directed to
execute all the necessary documentation required.
CARRIED
BACKGROUND
The Brock Lands are located within the Duffins Creek watershed in the Regional Municipality of
Durham and were conveyed to TRCA in 2011 from the City of Toronto. The lands are composed
of two distinct parcels, east of Brock Road, formerly known as, Brock North located north of the
5th Concession Road in the City of Pickering, and Brock South located south of the 5th
Concession Road in the Town of Ajax. The site was historically a sand and gravel extraction pit
that later became a temporary landfill site, from which the waste was removed. This has left the
terrestrial landscape and hydrologic function of the lands in a severely impaired condition.
It was first resolved at Authority Meeting #1/11, held on January 28, 2011 (Resolution #A13/11)
that the Brock Lands be identified as a site for habitat restoration and enhancement through the
strategic placing of clean fill. The Brock Lands are adjacent to Greenwood Conservation Area
(GCA) and Rodar property and are collectively known as the Greenwood Conservation Lands
(GCL) totaling 689 hectares (1,704 acres).
The lands were incorporated into the draft GCL Master Plan that was approved in principle by
the Authority Meeting #9/12 held on November 30, 2012 (Resolution #A219/12). Following this
approval, a draft GCL Master Plan was also endorsed by the Town of Ajax Council at General
Government Committee on October 10, 2013.
The main objectives of the Master Plan are to protect and restore ecological function to aquatic
and terrestrial systems, create a public destination that offers a variety of recreational and
cultural experiences, and to protect the area's valuable cultural heritage features. The GCL
Master Plan was finally approved by the Authority on June 24, 2016, including that staff be
authorized and directed to execute all the necessary documentation required to facilitate
restoration implementation (Resolution #A88/16). In addition, it was further resolved that the
funds for receiving the clean fill be set aside exclusively for project costs and implementation of
the Greenwood Conservation Lands Master Plan, including future restoration (Resolution
#A89/16).
A key component of the Master Plan was a detailed restoration strategy that attempted to
restore the heavily disturbed areas that had been stripped of their soil and have not developed
into sustainable vegetation communities. These highly altered areas require significant
regrading and soil addition to re-create functional topography, restore hydrology and improve
soils to support a healthy functional ecosystem.
The first restoration project at Brock South was completed in 2018 after placing a total of
650,000 cubic metres of subsoil and topsoil, to restore natural hydrologic processes, and
promote the development and succession of native vegetation communities. Restoration work at
Brock South completed to date includes:
• Construction of 2 hectares (ha) of new wetland habitat increasing biodiversity and
wildlife habitat;
Improved habitat connectivity;
• Improved hydrologic function for enhanced flood attenuation and improved base flow to
Duffins Creek;
• Improved water quality;
• 10.5 ha of new high-quality plantable area; and
Future recreational opportunities for the public.
TRCA staff have determined that the next phase of fill restoration at Brock South should be
implemented immediately adjacent to the original fill restored site. This is an area in great need
of restoration as it is highly impaired, poorly vegetated and is characterized by its thin soils,
altered hydrology and unproductive growing conditions. The little vegetation that has
established over the last 30 years is also primarily composed of non-native invasive
species.
The current plan would see the importation of 250,000 cubic metres of strictly topsoil fill
over the next two years to support the further restoration of the site and assist with the
implementation of the Greenwood Conservation Lands Master Plan.
RATIONALE
Request for Proposal #10033336 requesting proponents to submit proposals to supply and
place 250,000 cubic metres of clean topsoil in order to complete the works was publicly
advertised on the electronic procurement website Biddingo (www.biddingo.com) on April 21,
2020. Prospective proponents interested in submitting a proposal were advised a weighted
evaluation process would be used to select the successful proponent as follows:
Through the evaluation process a high level of due diligence is undertaken by TRCA to
determine the proponent's capabilities to perform the specified work and to verify the
securement of the fill sources the proponent has cited.
On May 5, 2020 TRCA received six (6) proposal submissions. Three (3) proposal met the RFP
requirements. Based on the results from the evaluation of the submissions the proponents were
ranked as follows:
PROPONENTS
Criteria
Weight
1.
Proponent's Information and Profile
5
2.
Experience and Methodology
10
3.
Capabilities of Meeting Scope of Work
15
4.
Proposed Work Plan and Timeframe
10
5.
Pricing
60
Total Weighted Points
100
Through the evaluation process a high level of due diligence is undertaken by TRCA to
determine the proponent's capabilities to perform the specified work and to verify the
securement of the fill sources the proponent has cited.
On May 5, 2020 TRCA received six (6) proposal submissions. Three (3) proposal met the RFP
requirements. Based on the results from the evaluation of the submissions the proponents were
ranked as follows:
PROPONENTS
RANKING
ACC Construction Ltd
1
Gentile Contracting Ltd
2
Roni Excavating Ltd.
3
Through the evaluation process it was determined that TACC Construction Ltd is the highest
ranking vendor(s) meeting the qualifications and requirements set out in the RFP. Therefore,
staff recommends the award of contract No #10033336 be awarded to TACC Construction Ltd.
Proponent's scores and staff analysis of the evaluation results can be provided in an in -camera
presentation, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
All operating costs will be offset by the revenue generated from the tipping fees. The gross
revenue from this contract is expected to be $1,375,000. All revenues and expenses associated
with this project will be directed to account 106-18.
DETAILS OF WORK TO BE DONE
TRCA staff will provide overall project management services including the implementation of the
Fill Quality Control Program that includes the pre -approval of all topsoil prior to delivery,
followed by fill tracking, monitoring and laboratory testing of soils received. TRCA staff will work
to secure all necessary permits and approvals. With the completion of the competitive process
to attract a capable and reputable fill supplier, TRCA will enter into a contract with TACC
Construction Ltd. to initiate the work as soon as possible.
Report prepared by: David Hatton, extension 5365 and Clifton Coppolino, extension 5772
Emails: David.hatton(cciltrca.ca and Clifton.coppolino(d.trca.ca
For Information contact: David Hatton, extension 5365, Ralph Toninger, extension 5366
Emails: David.hatton(a)trca.ca, Ralph.toninger(a)trca.ca
Date: May 6, 2020
Attachment: 1
Attachment 1: Brock South Proposed Fill Location Map
'
GREENWOOD
CONSERVATION LANDS
STUDY BOUNDARY
MAP 1.1
�
wnns.m.
xww
b
Brock
$
uvwm rw.
North
b
Rodar
Property
i
T
p
u
w s
5
Legend
Road
Proposed Fill Location
Watercourse
°N cszoxN°pOs
Greenwood
— Municipal Boundary
Conservafion Ates
Q Property Boundary
Brock
South
a
m,\
R
b
O,q/
4' Con=vapficrn
Aedarity
:
a 125 �,\ yp
pmMeun
RES.#A62/20 - VENDOR OF RECORD ARRANGEMENT FOR SUPPLY OF VARIOUS
PLANT MATERIALS
Award of Request for Proposal (RFP) No. 10022885 for a Vendor of
Record (VOR) arrangement for supply and delivery of large volumes of
various plant materials for various TRCA restoration and environmental
initiatives.
Moved by: Steve Pellegrini
Seconded by: Jack Heath
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a variety of
programs/projects that require a significant volume of native trees and shrubs;
AND WHEREAS TRCA solicited proposals through a publicly advertised process and
evaluated the proposals based on the criteria outlined in this report;
THEREFORE LET IT BE RESOLVED THAT TRCA staff be directed to establish a Vendor
of Record arrangement with Neil Vanderkruk (NVK) Holdings Inc., Dutchmaster Nurseries
LTD, Sheridan Nurseries, Verbinnen's Nursery, Hillen Nurseries Ltd., and Baker Forestry
Services for the supply of various plant materials for a three-year period from August 1,
2020 to July 31, 2023;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals
and the signing and execution of any documents.
CARRIED
BACKGROUND
TRCA requires large volumes of native trees and shrubs for habitat restoration and engineering
projects, as well as education and outreach initiatives with municipal, regional and community
partners. By establishing a VOR arrangement for various plant materials, vendors are
authorized to provide these goods and/or services for a defined period, and with fixed pricing.
Staff may contact a vendor on the list to provide various plant material goods, with a value up to
$50,000 per occurrence. Services above the $50,000 threshold are subject to TRCA's
Procurement Policy. Vendors will be required to provide all resources required to service the
divisional or program needs in accordance with applicable laws, codes, standards, terms and
conditions of the VOR agreement. The VOR arrangement will be subject to annual review in
order to confirm that the vendor(s) is/are providing an adequate level of service, and to update
any applicable insurance, certifications, or policies of the vendors.
RATIONALE
RFP documentation was posted on the public procurement website www.biddingo.com, on
February 11, 2020, and closed on March 3, 2020. Vendors were asked to provide unit pricing
including delivery on 201 individual plant items. A total of eight firms downloaded the
documents and six proposals were received from the following vendor(s):
• Neil Vanderkruk (NVK) Holdings Inc.
• Dutchmaster Nurseries LTD
• Sheridan Nurseries
• Verbinnen's Nursery
• Hillen Nurseries LTD
Baker Forestry Services
An Evaluation Committee comprised of staff from Restoration and Resource Management
reviewed the proposals. Three criteria were used to evaluate and select the recommended
Proponents based on availability and quality of their material. These criteria are listed in the
following table:
All vendors achieved above minimum scores in each of the three evaluation categories for
availability and quality of plant material.
Therefore, prospective vendors were permitted to provide unit pricing for each of the 201 plant
items and were scored individually using a ranking measure. Rarely does any one vendor stock
all plant material required by TRCA and therefore, were permitted to submit unit pricing only for
those items in which the vendor can supply. Based on this, the vendor with the lowest unit price
for a species, size, and format received a score of 10 points, the second lowest unit price a
score of 9 points, the third lowest unit price a score of 8 points and so forth. This resulted in a
possible maximum score of 10 points for each of the items that a Proponent bid on was then
converted to a score of 60.
Through the evaluation process it was determined that all vendors who submitted a bid met the
qualifications and requirements set out in the RFP at a competitive price. Staff recommends the
award of contract No. 10022885 to Neil Vanderkruk (NVK) Holdings Inc, Dutchmaster Nurseries
LTD, Sheridan Nurseries, Verbinnen's Nursery, Hillen Nurseries LTD, and Baker Forestry
Services. Proponents' scores, and staff analysis of the evaluation results, can be provided in an
in -camera presentation, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 1 — Green the Toronto region's economy
Strategy 3 — Rethink greenspace to maximize its value
Strategy 10 — Accelerate innovation
FINANCIAL DETAILS
Based upon a review of previous work completed for 2017— 2019, the anticipated costs for the
requested goods and/or services are approximately $2,250,000. An increase or decrease in
workload will have an impact on the value of this contract. All vendors on the VOR list
understand, both the potential cost, and resource implications, associated with changes in
workload. The goods and/or services will be provided on an "as required" basis with no
minimum quantities guaranteed.
Weight (%)
Minimum
Criteria
Acceptable
Score (%)
Organizational Experience
20
10
and Servicing Locations
Availability of Plant
10
1
Material (201 plant items)
Site Visit/ Plant
10
5
Inspection
Total
40
16
All vendors achieved above minimum scores in each of the three evaluation categories for
availability and quality of plant material.
Therefore, prospective vendors were permitted to provide unit pricing for each of the 201 plant
items and were scored individually using a ranking measure. Rarely does any one vendor stock
all plant material required by TRCA and therefore, were permitted to submit unit pricing only for
those items in which the vendor can supply. Based on this, the vendor with the lowest unit price
for a species, size, and format received a score of 10 points, the second lowest unit price a
score of 9 points, the third lowest unit price a score of 8 points and so forth. This resulted in a
possible maximum score of 10 points for each of the items that a Proponent bid on was then
converted to a score of 60.
Through the evaluation process it was determined that all vendors who submitted a bid met the
qualifications and requirements set out in the RFP at a competitive price. Staff recommends the
award of contract No. 10022885 to Neil Vanderkruk (NVK) Holdings Inc, Dutchmaster Nurseries
LTD, Sheridan Nurseries, Verbinnen's Nursery, Hillen Nurseries LTD, and Baker Forestry
Services. Proponents' scores, and staff analysis of the evaluation results, can be provided in an
in -camera presentation, upon request.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 1 — Green the Toronto region's economy
Strategy 3 — Rethink greenspace to maximize its value
Strategy 10 — Accelerate innovation
FINANCIAL DETAILS
Based upon a review of previous work completed for 2017— 2019, the anticipated costs for the
requested goods and/or services are approximately $2,250,000. An increase or decrease in
workload will have an impact on the value of this contract. All vendors on the VOR list
understand, both the potential cost, and resource implications, associated with changes in
workload. The goods and/or services will be provided on an "as required" basis with no
minimum quantities guaranteed.
Funds for the contract are identified in account 125-30, Outside Sourced Plant Material. Costs
to these accounts are recoverable from end user projects and programs.
Report prepared by: Waylon D'Souza, extension 6408
Emails: waylon.dsouza(ab_trca.ca
For Information contact: Waylon D'Souza or Ralph Toninger, extension 6408 or 5366
Emails: waylon.dsouza(a)trca.ca or ralph.toninger(a)trca.ca
Date: May 7, 2020
RESMA63/20 - APPOINTMENT OF OFFICERS AND DESIGNATION AS PROVINCIAL
OFFENCES OFFICERS
Recommended appointment of officers under Section 28(1)(d) of the
Conservation Authorities Act, and a Provincial Offences Officer be
approved for the purposes of:
i) Enforcing Regulations made by the Toronto and Region
Conservation Authority pursuant to Section 29 of the Conservation
Authorities Act, R.S.O 1990, c. C.27
ii) Enforcing the Trespass to Property Act, R.S.O. 1990, c. T21
Moved by: Linda Jackson
Seconded by: James Pasternak
THAT Margaret Milner, Dean Ross and Kevin Laporte be appointed as Officers and
Provincial Offences Officers for the purposes of compliance and enforcement of Section
29 of the Conservation Authorities Act, R.R.O. 1990, Regulation 119 relating to use of
Authority landholdings, and the Trespass to Property Act by the Board of Directors of the
Toronto and Region Conservation Authority (TRCA), pursuant to Section 28 of the
Conservation Authorities Act.
CARRIED
BACKGROUND
The Conservation Authorities Act provides for a conservation authority to appoint officers to
enforce its regulations. Furthermore, the Minister of Natural Resources and Forestry has
implemented, under the authority of Subsection 1(3) of the Provincial Offences Act, a class
designation process for all conservation authorities whereby any conservation authority officer
appointed under Section 28(1)(d) of the Conservation Authorities Act shall be designated by the
Minister simultaneously as a Provincial Offences Officer. Once appointed, officers have the
authority to enforce offences and Regulations under the Conservation Authorities Act, in
addition to the Trespass to Property Act when carrying out their duties within the jurisdiction of
the conservation authority.
The prerequisite to the Minister's Provincial Offences Officer appointment is that all candidate
officers:
i) Be adequately trained in the legislation to be enforced, including the Provincial
Offences Act;
ii) Have proof of a clean criminal record check, and;
iii) Be appointed as an officer to enforce conservation authority legislation at an official
board meeting.
Pursuant to the approval of the above noted appointment, the Minister's requirements have
been addressed.
RATIONALE
Margaret Milner, Dean Ross and Kevin Laporte are full-time employees within our Conservation
Parks Division, and responsible for overseeing the operations of our conservation areas and
campgrounds. These appointments will enable them to assist with the safety and enjoyment of
patrons within our facilities and assist with the Authority's regulatory requirements and
compliance objectives.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 4 — Create complete communities that integrate nature and the built
environment
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
No added expense through conservation parks budget.
DETAILS OF WORK TO BE DONE
Annual recertification of confrontation management training, uniform and personal protective
equipment to be purchased.
Report prepared by: Brian Moyle, extension 5229
Emails: brian.moyle(a)trca.ca
For Information contact: Brian Moyle, extension 5229
Emails: brian.moyle(a)trca.ca
Date: May 15, 2020
Attachments: 1
Attachment 1: Appendix
Attachment 1: Appendix
The Conservation Authorities Act, s.28(1)(d) and 28(1)(e), allows for the appointment of officers
to enforce s.28 (Ont. Reg. 166/06 - natural hazard/ natural heritage regulation) and s.29 (R.R.O
1990, Regulation 119 (Reg 119 - lands owned by the authority).
In 1999, the Minister of Natural Resources and Forestry (MNRF) implemented, under the
authority of s.1(3) of the Provincial Offences Act, a class designation process for conservation
authority officers that simultaneously designated them as Provincial Offences Officers. This
provided officers the ability to enforce both the conservation authority regulations and the
Trespass to Property Act (TPA).
This appointment is contingent on candidates meeting the following prerequisites:
• Being adequately trained in the legislation being enforced, including the Provincial
Offences Act;
• Having proof of a clean criminal background;
• being appointed as an officer at an official Board Meeting.
TRCA has established a tradition of appointing officers in three distinct categories:
Enforcement Officers appointed on a full-time basis to establish compliance with, and to
enforce our legislation (Ont. Reg. 166/06, Reg. 119 and TPA). Enforcement Officers play
an important role in the Authority's objectives to prevent, eliminate, or reduce the risk to
life and property from flooding, erosion and slope instability, and to encourage the
protection, enhancement and enjoyment of the natural systems, recreational facilities
and landholdings.
Enforcement Officers actively participate in environmental and construction compliance
and protection initiatives within our regulatory jurisdiction, in addition to public safety and
land use infractions. This position entails conducting regular compliance audits/
inspections of TRCA Planning and Development permit sites, responding to public
inquiries and complaints regarding the Authority's permitting processes, addressing
unauthorized activities on our landholdings, and participating in TRCA River Watch
program associated with our corporate flood forecasting and warning responsibilities.
Officers routinely interact with other internal TRCA business units, and liaise closely with
external partnering agencies, including our member municipalities and provincial and
federal agencies. Officers maintain communications with developers, consultants,
contractors, special interest groups, stakeholders, landowners, and the general public to
address our compliance objectives and promote awareness of TRCA's initiatives.
Officers maintain accurate records and reports, negotiate compliance with our
legislation, conduct investigations, and initiate legal action for significant unlawful
activities.
2. Provincial Offences Officers consist of full-time employees within our Parks and Culture
Division, and the appointment provides staff members the ability to enforce s.29 of the
Conservation Authorities Act (Reg 119 and TPA).
The designations of senior Conservation Parks staff and supervisors within our
conservation areas provide the required authority to address public safety concerns,
compliance issues, unauthorized land use activities, and aid in the protection and
promotion of family oriented recreational facilities on our landholdings. These staff
members are primarily responsible for overseeing the operations and maintenance of
our conservation areas and campgrounds, supervision of seasonal staff members, and
for divisional business planning. Although their job function is not enforcement oriented,
staff will engage in the enforcement and compliance role based on availability and when
deemed appropriate and safe to do so. Provincial Offences Officers within our
Conservation Parks provide a great deal of value to the organization and the public, and
represent the Authority's compliance interests in a professional manner.
Appointed staff members identify and address compliance issues associated with
unauthorized land use activities, aid in mitigating risk, liaise with and work alongside
TRCA Enforcement Officers on strategic weekend shifts/ patrols, supervise site
operations of our contracted security provider, and arrange for special paid duty patrols
of police in order to promote the safety and enjoyment of our conservation areas and
campgrounds. Threats to TRCA staff and the public, and issues involving criminal
activities, are referred to local police agencies and documented for internal records and
reporting.
3. Administrative Enforcement Officers consists of our Chief Executive Officer and senior
staff members within our Development and Engineering Division (Associate Directors,
Senior Managers, Managers, Senior Planners).
Although there is no legislative requirement within our Act to have permits signed/
authorized by an Enforcement Officer, Section 3(3) of Ont. Reg. 166/06 identifies a
requirement to have the Executive Committee or designate staff member(s) with
respects to granting permissions (permits) for approvals issued under s.28 of the Act.
3(3) Subject to subsection (4), the Authority's executive committee, or one or more
employees of the Authority that have been designated by the Authority for the purposes
of this section, may exercise the powers and duties of the Authority under subsections
(1) and (2) with respect to the granting of permissions for development in or on the areas
described in subsection 2 (1). O. Reg. 82/13, s. 2.
TRCA has been a tradition of having permissions/ permits signed by Enforcement
Officers, and these administrative appointments are solely for this purpose, and not
intended to provide designations to enforce provisions of any Act or regulation.
TRCA currently has a total of:
• Five (5) full time appointed Enforcement Officers
• Nine (9) appointed Provincial Offences Officer within our Conservation Parks
TRCA staff appointments as Officers and Provincial Offences Officers:
1. Enforcement Officers:
Brian Moyle, Manager, Enforcement and Compliance
Paul Nowak, Enforcement Officer
Ben Krul. Enforcement Officer
Michael Brestansky, Enforcement Officer
Christopher Cummings, Enforcement Officer
2. Provincial Offences Officers - Parks and Culture Division:
Doug Miller, Senior Manager, Conservation Parks
Sven Pittlekow, Supervisor, Boyd CA and Indian Line Campground
Steve Beausoleil, Supervisor, Glen Haffy CA and Heart Lake CA
Jay Clark, Supervisor, Albion Hills CA and Campground
Stephen Lenstra, Supervisor, Petticoat Creek CA
Tom Boyce, Assistant Supervisor, Petticoat Creek CA
Nolan Patterson, Assistant Supervisor, Glen Haffy CA and Heart Lake CA
Brett Bond, Lead Hand, Albion Hills CA and Campground
Kyle Reyes, Lead Hand, Albion Hills CA and Campground
2. Pending Appointments - Parks and Culture Division:
Margaret Milner, Lead Hand, Indian Line Campground
Dean Ross, Lead Hand, Heart Lake CA and Glen Haffy CA
Kevin Laporte, Petticoat Creek CA
RES.#A64/20 - TORONTO BOTANICAL GARDENS MEMORANDUM OF
UNDERSTANDING AND SERVICE LEVEL AGREEMENT
Toronto and Region Conservation Authority (TRCA) staff are advising the
Board of Directors of TRCA's intent to enter into a Memorandum of
Understanding (MOU) setting the guiding principles of a long-term
relationship between TRCA and the Toronto Botanical Gardens (TBG),
and to report back to the Board on any subsequent Service Level
Agreement or specific Agreements with the TBG for a variety of
environmental initiatives that provide mutual benefits to the two
organizations.
Moved by: Steve Pellegrini
Seconded by: Jack Heath
WHEREAS TRCA is dedicated to the conservation and management of natural
resources;
AND WHEREAS the TBG operates a living museum, maintaining documented plant
collections for the purposes of education, conservation, research and display;
AND WHEREAS TRCA and the TBG recognize that there are opportunities for
cooperation and collaboration and agree to establish a framework for an ongoing
collaborative relationship;
AND WHEREAS TRCA can support the TBG desire to expand through knowledge and
support through design development, fundraising, construction and public education
and awareness;
THEREFORE LET IT BE RESOLVED THAT TRCA staff be directed to enter into a non-
binding Memorandum of Understanding (MOU) with the TBG (attached) which
includes general principles which will guide cooperation and collaboration between
the two organizations on a variety of natural resources management and related
environmental initiatives;
THAT staff be authorized to prepare a Service Level Agreement(s) and Letter
Agreements with the TBG for TRCA to undertake a variety of activities on behalf of the
TBG that may include but not be limited to activities such as:
(a) erosion hazard mitigation;
(b) forest management and arboricultural services;
(c) review of TRCA Permit Applications under O.Reg. 166/06, including water
resources engineering, geotechnical engineering and ecology;
(d) coordination with City of Toronto Urban Forestry — Ravine and Natural Feature
Protection By-law staff;
(e) terrestrial and aquatic restoration opportunities;
(f) invasive species management plans and implementation;
(g) restoration opportunity planning and prioritization;
(h) wildlife and ecosystem management services;
(i) trails and facilities planning design, permitting and construction;
(j) education and outreach related services;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action
may be required to implement the recommendations, including the obtaining of
necessary approvals and execution of any documents.
CARRIED
BACKGROUND
The Toronto Botanical Garden (TBG) with the City of Toronto have developed the "Edwards
Gardens and Toronto Botanical Garden 2018 Master Plan and Management Plan"
(Attachment 2). This TBG Board approved plan identifies the expansion of the location from
four (4) to thirty-five (35) acres in order to create a globally -acclaimed botanical garden. The
Plan identifies potential partners and lists TRCA as a site partner, as TRCA is a regulator for
which consultation on programming and management would be required.
TRCA has been mitigating flooding and erosion hazards and protecting, restoring, and
enhancing terrestrial and aquatic habitat for decades. We have applied our knowledge of
stream, valley and shoreline management, and our professional expertise to achieve
numerous successful projects in partnership with other public agencies such as the City of
Toronto and Waterfront Toronto. Some of this work for the City of Toronto has recently
occurred and is underway in Wilket Creek. TRCA currently operates under Memorandum of
Understanding (MOU) and fee for service delivery agreements with these agencies to
provide highly specialized and cost-effective environmental monitoring, project management,
landscape design, stakeholder consultation, environmental approvals and construction
services. As evidenced by our longstanding and continued partnerships, we can expedite
required environmental approvals, facilitate community engagement and consultation, meet
tight timelines and realize positive project outcomes.
RATIONALE
By leveraging TRCA's in depth local knowledge, experience and relationships with Wilket
Creek and Don River West Watershed stakeholders, we believe the TBG can achieve
greater success with its planned projects outlined in the Master Plan and Management Plan,
such as flood mitigation measures; protecting assets against the hazards of erosion and
slope instability; designing and constructing new trails; planning and implementing strategic
invasive species management; riparian planting; and carrying out forestry work and
arboricultural services.
The development and execution of a MOU allows the two organizations to agree on the
guiding principles of a long-term partnership that seeks to expedite initiatives that are deemed
beneficial to both parties. An MOU is typically intended to be non-binding, but it signals the
intention of two parties to enter into future agreements from a position of mutual respect and
shared objectives.
Where specialized services are requested to be provided by TRCA to advance specific
initiatives of the TBG, a Service Level Agreement and subsequent Letter Agreements govern
the terms and conditions related to how future services will be provided on a fee for service
basis. It is recommended that the Service Level Agreement with the TBG be similar to the type
of agreement that TRCA has with the City of Toronto Parks and Forestry Division but tailored
specifically to the needs of the TBG on the lands that they lease from the City of Toronto. With
respect to the provision of specific services, a Letter Agreement template appended as a
Schedule to the Service Level Agreement will be used to set out the specific scope of work,
budget, schedule and other details for specific projects.
It is the desire of TRCA and the TBG to finalize and execute the MOU following approval by
each party's respective Board of Directors, with the Service Level Agreement to be developed
in summer 2020. Once the Service Level Agreement is executed, Letter Agreements may be
executed from a preapproved template for specific projects on an as needed basis.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 2 — Manage our regional water resources for current and future generations
Strategy 3 — Rethink greenspace to maximize its value
Strategy 5 — Foster sustainable citizenship
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
TRCA and the TBG will each fund their respective costs associated with the development
and execution of these agreements, with TRCA's portion covered by projects funded by
its stakeholders or partners.
Report prepared by: Nancy Gaffney, extension 5313
Emails: nancy.aaffneyCa?trca.ca
For Information contact: Nancy Gaffney, extension 5313
Emails: nancy.naffney(a)trca.ca
Date: May 22, 2020
Attachments: 2
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
Attachment 2: Edwards Gardens and Toronto Botanical Garden 2018 Master Plan and
Management Plan
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
MEMORANDUM OF UNDERSTANDING ("MOU")
FOR PARTNERSHIP AND COLLABORATION
BETWEEN:
TORONTO AND REGION CONSERVATION AUTHORITY ("TRCA")
and
TORONTO BOTANICAL GARDEN
("TBG")
BACKGROUND
A. TRCA is a body corporate under the Conservation Authorities Act 1990, dedicated to the conservation
and management of natural resources including, community action on environmental matters.
B. TBG is a non-profit charitable organization provincially incorporated in 1963. It operates as a living
museum, maintaining documented plant collections for the purposes of education, conservation,
research and display.
C. The "Edwards Gardens and Toronto Botanical Garden 2018 Master Plan and Management Plan" is a
City of Toronto and TBG Board -approved plan to expand TBG from its present four acres to 35 acres in
order to create a globally acclaimed botanical garden. The master plan identifies Potential Areas of
Development and Types of Partners.
D. TRCA has extensive knowledge and experience delivering projects and programs in the areas of
riparian planting, ravine restoration, native and invasive species management, biodiversity and habitat
conservation, flood management, resilience and green engineering.
E. TBG has a reputation for its horticultural excellence and public programs, including adult and
children's education programs, symposia, community events and public outreach.
F. TRCA can provide knowledge and support through design development, fundraising, construction and
public education and awareness.
G. TRCA and Toronto Botanical Garden recognize that there are opportunities for cooperation and
collaboration and agree to establish a framework for an ongoing collaborative relationship.
H. TRCA and Toronto Botanical Garden are entering into this non-binding MOU to agree upon the
general principles which will guide cooperation and collaboration between the two organizations.
1. Commencement and Term
1.1. Each of TRCA and the Toronto Botanical Garden is a "Party" under this MOU and together are the
"Parties."
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
1.2. This MOU shall commence upon the date it is signed by both Parties and it will expire on 2025-02-
28, unless the term is extended.
1.3. Prior to its expiry, this MOU shall be reviewed by the Parties to determine whether a new MOU
should be executed by the Parties.
2. Areas of Cooperation and Collaboration
2.1. The Parties agree to the following underlying general principles as the basis for their relationship:
2.1.1. It is important for the two organizations to have open lines of communication at all levels and, as
such, they will strive to facilitate open and timely communication with each other.
2.1.2. To the extent that one Party bring forward a project or projects to the other Parry seeking support
and/or approval, such other Parry will commit to exploring the projects(s).
2.2. Areas of collaboration and cooperation between the Parties may include:
• Design Development
• Construction
• Strategic Planning
• Public Engagement and Awareness
• Education and Outreach
• Sharing Best Practices
2.3. TRCA may be engaged by Toronto Botanical Garden to undertake work on behalf of TBG on a cost
recovery basis, as detailed in Schedule A.
1. Erosion Hazard Mitigation
2. Forest Management and Arboricultural Services
3. Review of TRCA Permit Applications under 0. Reg. 166/06
4. Coordination with City of Toronto Urban Forestry- Ravine and Natural Feature
5. Protection By-law staff
6. Terrestrial and aquatic restoration
7. Invasive Species Management Plans and Implementation
S. Restoration Opportunities Planning & Prioritization
9. Wildlife and Ecosystem Management Services
10. Trails and Facilities, Design, Permitting, Construction
3. Implementation and Project Delivery
3.1. Responsibility for implementing this MOU is shared equally by the Parties.
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
3.2. The Parties shall meet regularly to identify and explore opportunities for the implementation of the
commitments in this MOU.
3.3. Where TRCA undertakes cost recovery work on behalf of Toronto Botanical Garden, the form of
Service Level Agreement and Letter Agreement included as Schedule "B" shall be used as the agreement
for that work.
4. General
4.1. The Parties acknowledge that as this MOU does not create any binding obligation. The parties
intend to enter into separate Letter Agreements to cover specific commitments and responsibilities for
delivery of specific projects.
4.2. Amendments to this MOU can only be made by the written agreement of the Parties.
4.3. The Parties are independent parties and nothing in this MOU shall create the relationship of
principal and agent, employer and employee, partnership or joint venture between the Parties.
4.4. This MOU will not restrict either Party from entering into supplemental or other agreements with
each other, or other participating organizations, sponsors, media or other third parties. Nothing in this
MOU shall preclude the Parties from conducting their business affairs in the usual manner.
4.5. This Agreement may be executed in counterparts. Either Party may send a copy of its executed
counterpart to the other party by email instead of delivering a signed original of that counterpart. Each
executed counterpart (including each copy sent by email) will be deemed to be an original; all executed
counterparts taken together will constitute one agreement.
This MOU is entered into by the following representatives of the Parties:
Toronto and Region Conservation Authority
Date:
John MacKenzie
Chief Executive Officer
Jennifer Innis
Chair, Board of Directors
Toronto Botanical Garden
Date:
David Mclsaac,
Chief Executive Officer
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
Gino Scapillati,
President and Board Chair
Schedule "A" to MOU between TRCA and Toronto Botanical Garden DESCRIPTION OF AREAS FOR
SERVICE AGREEMENTS
1. Erosion Hazard Mitigation
TRCA's Engineering Projects (EP) group has a longstanding Erosion Risk Management Program (ERMP)
that focuses on the identification, long-term monitoring, and remediation of erosion hazards throughout
TRCA's jurisdiction. TRCA's EP group is a full service team of environmental, engineering, and
construction professionals that are able to see projects through the entire life cycle including: hazard
identification, detailed design development, project management (obtain all permits & approvals for
construction), topographic surveying, and construction. This expertise relates predominantly to the
implementation of remedial erosion control works. EP staff are also able to oversee a variety of other
activities related to construction in sensitive areas.
Toronto and Region Conservation Authority's (TRCA) Erosion Risk Management team has been
monitoring 22 erosion control structures within Edwards Gardens since 2012. The structures are
composed of a variety of different materials to minimize further watercourse -based erosion in this area.
TRCA doesn't have record of any other erosion hazards in this area.
2. Forest Management and Arboricultural Services
TRCA's forestry expertise allows it to offer comprehensive and integrated forest management,
reforestation, restoration, hazard management, and arboricultural services. Active management of
forests greatly improves forest health, biodiversity, resilience to insects, disease and climate change,
and provides direct risk management to ensure public safety.
Specifically, TRCA's expertise allows us to offer arboricultural, hazard tree management, and forestry
services. TRCA's complement of ISA certified arborists, hazard tree technician, and Registered
Professional Forester (RPF) are able to provide a complete suite of arboricultural and forestry
management activities and services, such as;
• Butternut health assessments,
• Individual tree health assessments and prescriptions,
• Tree inventories,
• Arborist reports,
• Forest management plans,
• Tree removals and mitigation
• Tree retainment and injury mitigation
• Development and certification of City of Toronto's Ravine and Natural Features
Protection (RNFP) permit applications
• Development of Tree Protection and Plan Review (TPPR) to obtain permits and
approvals for trees situated on public and private lands within the City of Toronto
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
• Complete coordination of the application and approval process of all City of Toronto
tree protection, and permitting processes
TRCA also operates and supplies native trees and shrubs from its own native plant nursery. Locally
collected seed is used to grow highly desirable hardy native plant materials that is well adapted to our
local growing conditions.
3. Review of TRCA Permit Applications under 0. Reg. 166/06
Review of TRCA Permit Applications under 0. Reg. 166/06, including water resource engineering,
geotechnical engineering and ecology.
4. Coordination with City of Toronto Urban Forestry. Ravine and Natural Feature Protection By-law
staff
Permits are required for tree removal or injury under the by-law. If TRCA staff are completing a project
for the gardens on behalf of the gardens, TRCA could coordinate the ravine permit approvals. When
TRCA is reviewing a permit application submitted by the gardens, we will coordinate our approval with
that of the ravine by-law, which is helpful and streamlines the process.
S. Terrestrial and aquatic restoration
TRCA is a global leader in ecological restoration, with more than 50 years of experience protecting,
enhancing, restoring and monitoring impaired natural habitats. TRCA strives to protect, enhance and
regenerate natural resources within the TRCA jurisdiction through various restoration projects. These
projects focus on: improving natural cover; improving riparian areas; restoring wetlands; stream
restoration using natural channel design principles; and enhancing essential wildlife habitat. Through a
detailed understanding of ecology and the interconnected roles of hydrology, natural habitats, and flora
and fauna, the Restoration and Resource Management group is able to identify the ecological needs at a
site and set appropriate restoration targets to enhance and restore natural areas. Our ecological
restoration programs are essential to maintaining a robust and resilient natural system that can benefit
human health and well-being -especially as the Greater Toronto Area continues to experience
environmental pressures of urbanization and climate change.
6. Invasive Species Management Plans and Implementation
Closely connected to ecological restoration is invasive species management, in particular invasive plant
management. TRCA's focus on invasive species management targets prevention, early detection and
rapid response; eradication, containment and control; protection of high priority areas; and
coordination, knowledge transfer and awareness. Using best management practices, TRCA develops site
specific invasive plant species management plans that typically include the objectives of reducing
invasive infestation and restoring the site to native natural cover to provide optimal ecological function.
Invasive species management plans generally include 3-5 years of staff -led control, followed by
restoration and a long-term monitoring program to identify and manage new infestations. Depending on
the site and the species, long-term management can often include community involvement.
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
7. Restoration Opportunities Planning & Prioritization
Ecosystem restoration planning requires an integrated approach considering many components of the
natural system when prioritizing where and what to restore. TRCA and our partners have developed a
multi -discipline and multi -benefit approach to restoration planning that facilitates effective restoration
works, while realizing regional watershed objectives and providing development compensation options.
Through various long-term monitoring and modelling initiatives TRCA has amassed a wealth of
knowledge on terrestrial biodiversity, aquatic ecosystems, hydrology, and headwater conditions. The
aim of Integrated Restoration Prioritization (IRP) is to identify impairments and threats to ecosystem
function to improve the delivery of ecological goods and services. Consolidating data and comparing
discrete areas based on different parameters and thresholds has helped direct decision making for
future restoration initiatives. Using IRP and TRCA's Restoration Opportunities Database as planning
tools, priority habitats and corridor linkages, that could contribute most to improving the natural
system, can be protected, enhanced or rehabilitated.
8. Wildlife and Ecosystem Management Services
Urban areas can often create conditions that result in human -wildlife conflict. Examples of this range
from the fouling of manicured areas by Canada Geese, to beaver dams that impound water, to road
ecology issues. As experts in wildlife habitat, TRCA has the knowledge and experience to undertake site
specific management and reduce conflict. In most cases, human/wildlife conflict can be mitigated by
undertaking appropriate ecosystem management measures, as well as education, rather than managing
the wildlife itself. For example, vegetation impacts caused by white-tailed deer herbivory can usually be
addressed through exclusion techniques that prevent deer access to vegetation. Wildlife mortality (i.e.,
small mammals and reptiles) due to vehicles can be mitigated through the proper design and installation
of eco -passages and associated fencing. Wildlife management also includes a significant educational
component to improve understanding, awareness and tolerance of urban wildlife, as well as to ensure
the public understands actions, they can take to improve their safety (i.e., coyote encounters).
9. Trails and Facilities, Design, Permitting and Construction
As one of the largest landowners in the Greater Toronto Area, TRCA is a leader in the planning, design,
implementation and management of trails and associated infrastructure that provide safe, enjoyable
recreational trail experiences for area residents and visitors. These offerings are developed such that the
natural and cultural heritage resources are protected. TRCA's trail management activities also
complement TRCA's aim to provide nature -based recreation experiences for a growing population while
protecting and restoring the form and function of existing ecological systems. This experience which
includes designing, construction and permitting related to infrastructure and facilities could be utilized
by the Garden in work on new facilities.
Attachment 1: Draft Memorandum of Understanding with Toronto Botanical Gardens
Schedule "B" to MOU between TRCA and Toronto Botanical Garden
LETTER OF AGREEMENT TEMPLATE
Section III — Items for the Information of the Board
TORONTO AND REGION CONSERVATION AUTHORITY
ADMINISTRATIVE OFFICE BUILDING PROJECT
Update on Toronto and Region Conservation Authority (TRCA)
Administrative Office Building Project and implications on the Project
schedule, municipal approvals and construction management contract
resulting from the COVID-19 pandemic.
Moved by: Paul Ainslie
Seconded by: Cynthia Lai
IT IS RECOMMENDED THAT this staff report on the status of the TRCA Administrative
Office Building Project be received.
CARRIED
BACKGROUND
On February 27, 2015 Res. #A23/15 approved 5 Shoreham Drive as the preferred site for the
new TRCA administration building. On June 24, 2016 Res. #A85/16 approved a project budget
of $70M with $60M provided by participating municipalities and the remaining funds from land
disposition funds. On February 24, 2017 Authority Res. #A14/17 staff reported that all six of
TRCA's participating municipalities had approved the Project and the allocation of $60M in new
and existing capital funding. On May 25, 2018 Authority Res. #A79/18 staff reported that the
Minister of Natural Resources and Forestry granted approval to use $3,538,000 in disposition
proceeds from land sales, for a revised overall budget of $63,538,000 and, if possible, that the
disposition funds be used to reduce the overall term of the required financing. The revised
approved upper limit of the project budget of $60M was not increased at that time, as the
decision was made to wait until the tendering process was complete in mid -2019 to determine a
more accurate budget for the project.
On May 17, 2017 Authority Res. #A83/17 TRCA awarded Jones Lang LaSalle Canada (JILL) as
its project managers and on August 30, 2017 Authority Res. #A156/17 awarded the integrated
design contract to a team led by ZAS Architects and Bucholz McEvoy Architects, to proceed
with the detailed design, planning and approvals, of the Project. On November 3, 2017 Authority
Res. #A216/17 awarded Eastern Construction Company Limited a Construction Management
Contract to provide pre -construction services throughout the design and procurement stages
along with construction management services for the construction of the new facility pending
agreement on the construction cost of the Project. This work includes the issuance of tenders to
construction trades.
On Friday, January 25, 2019 Board of Directors Res.#A19/19 staff issued an update on the
procurement of financial services and that the Canadian Imperial Bank of Commerce (CIBC) is
providing a term loan for the costs of the new administration building project up to $54,000,000.
On Friday, May 24, 2019 Board of Directors Res.#A78/19 staff provided an update on project
costing and a strategy to move to the tendering process and received direction from the Board
to report back on the total construction and Construction Management Services costs at the
time construction tenders are received.
On Friday January 24, 2020 Board of Directors RES. #A232/19 provided an update on the value
engineering process and informed the Board that staff had authorized the project construction
manager Eastern Construction to award construction tenders to selected trades that align with
the project budget. The report explained that staff had authorized Eastern Construction to
proceed with construction, and finally, that staff were authorized to issue Notices of Borrowing to
the project financial services provider according to the loan schedule based on the project cash
flow.
On Friday April 24, 2020 at Board Meeting #3/20 staff were requested to provide an update on
the delay to the project related to COVID-19.
RATIONALE
The COVID-19 pandemic led to the Ontario government order to close all non-essential
businesses pursuant to its powers under the Emergency Management and Civil Protection Act
(the "Emergency Act"). On March 23, 2020, the Ontario government issued a list of essential
businesses that would be exempt from the closure order effective Tuesday, March 24 at 11:59
pm for at least 14 days. The Ontario government has since significantly expanded the list of
non-essential workplaces with the introduction of Ontario Regulation 119/20: Order under
Subsection 7.0.2(4) - Closure of Places of Non -Essential Businesses, which was declared into
law at 3 PM on April 3, 2020 (the "Essential Services Regulation"). On April 14, 2020, the
Ontario government extended the state of emergency another 28 days to May 12, 2020. On
May 1, 2020, the Ontario Government revised the list of Closure of Places of Non -Essential
Businesses with Ontario regulation 196/20 which allowed for site preparation and excavation
works to occur.
Site Closure
On April 3, 2020 Eastern Construction by email informed TRCA that Eastern Construction would
be suspending work on the project that day as the project no longer fell into a category of
essential services. Eastern Construction issued an official notice on April 6, 2020 of work
suspension but would be working April 6, 2020 to undertake the necessary construction and
maintenance activities to ensure safety at the temporarily closed project site. On May 1, 2020
Eastern Construction in response to the revised list issued by the Ontario government indicated
by email that construction would resume on May 4, 2020 as the revised list allowed Eastern
Construction to resume site and soil preparation work. While Eastern Construction staff were on
site, the soil preparation trade was not available and did not start until May 13, 2020.
Schedule
RES. #A232/19 revised the project occupancy date to February 2022 due to a Site Plan
Approval delay related to ongoing negotiations with Tennis Canada and work with the City of
Toronto on the lease of the City road right of way. The COVID-19 pandemic and the closure
order of all non-essential businesses has altered the project occupancy date to reflect the length
of time the Government closure order was in effect and Eastern Construction suspended
construction. In general, the project approvals delay has been exacerbated by the closure of the
City Civic Centres and the resulting diminished capacity of the City to process applications.
TRCA has issued to the City of Toronto all the pre -approval Notice of Approval Conditions
(NOAC) including drafts of the shared use agreement with neighbouring Tennis Canada and the
lease agreement with City of Toronto for the use of the road right of way but both agreements
need to be finalized for the Site Plan Agreement to be issued which is a pre -requisite for the
Final Building Permit. Prior to the closure of non-essential activities, the City Building
Department issued a Conditional Permit allowing for foundations to be constructed. To mitigate
schedule risk, an above ground conditional permit application has been submitted to the City.
City staff continue to reach out during the closure to work with the TRCA team to process
applications and staff are confident that further conditional permits will be forthcoming to allow
work to continue.
Milestone Schedule:
TRCA staff will continue to work with Eastern Construction and the City of Toronto to attempt
mitigate further approvals delay. TRCA will also work with Eastern Construction to determine
opportunities to compress the extended schedule while minimizing cost exposure.
Report prepared by: Jed Braithwaite, extension 5345
Emails: med.braithwaite(a trca.ca
For Information contact: Jed Braithwaite, extension 5345
Emails: ied.braithwaite@trca.ca
Date: May 11, 2020
Dec.18/19 — Baseline
Mar. 31/20 - Revised
Notes
Schedule
Schedule
Site Plan Approval
Feb. 2020
TBD
NOAC received Nov. 8/19 —
all pre -approval conditions
submitted
Full Building Permit
Mar. 2020
Jun. 2020
Applied for above grade
Conditional Permits in Mar.
2020.
Conditional
Jan. 2020
Mar. 30/20
Received conditional
Building Permit
building permit for
foundations only in Mar.
2020
Construction
Jan. 2020 to Dec 2021
Jan. 2020 to Mar. 2022
Schedule impacted by site
closure due to COVID-19
Occupancy
Nov. 2021
Feb. 2022
Schedule impacted by site
closure due to COVID-19
Completion
Jan. 2022
Mar. 2022
Schedule impacted by site
closure due to COVID-19
TRCA staff will continue to work with Eastern Construction and the City of Toronto to attempt
mitigate further approvals delay. TRCA will also work with Eastern Construction to determine
opportunities to compress the extended schedule while minimizing cost exposure.
Report prepared by: Jed Braithwaite, extension 5345
Emails: med.braithwaite(a trca.ca
For Information contact: Jed Braithwaite, extension 5345
Emails: ied.braithwaite@trca.ca
Date: May 11, 2020
RES.#A66/20 - TRCA ENFORCEMENT AND COMPLIANCE DURING COVID-19
An update on enforcement and compliance at TRCA parks and facilities.
Moved by: Linda Jackson
Seconded by: Dipika Damerla
IT IS RECOMMENDED THAT the TRCA Enforcement and Compliance during COVID-19
report, be received.
CARRIED
BACKGROUND AND RATIONALE
TRCA Enforcement Officers play an integral role in the management of natural hazards and
natural heritage features within our watersheds and in the preservation and protection of
TRCA's valuable parks and greenspace lands. Their primary responsibilities include the
inspection of construction and development projects to ensure compliance with approved permit
drawings and conditions relating to works approved under the Regulation, responding to
stakeholder complaints and violations occurring within TRCA's regulatory jurisdiction and
responding to unlawful activities reported on our landholdings.
The Enforcement and Compliance Unit is currently comprised of 5 Enforcement Officers,
including the Manager, and currently has a vacant position required to be filled. Officers are
responsible for significant geographical areas comprised of several municipalities per officer
within our watersheds.
Albeit small, the business unit has proven extremely effective in its compliance efforts. Over the
past three years, the team annually conducted on average 4700 permit compliance inspections,
issued 106 Notices of Violations, addressed 279 stakeholder complaints, conducted 557
inspections relating to complaints and violations, successfully resolved 38 violations and were
deployed to assist our Conservation Parks on strategic weekend shifts throughout the summer
months.
Under normal operating circumstances, the business unit is working at capacity to ensure that
our regulatory responsibilities are being adequately managed. With the onset of the Covid-19
pandemic, TRCA's enforcement responsibilities were dramatically increased to provide for an
ongoing presence and deterrent at our parks and trails.
COVID-19 Response
Following the issuance of the Provincial Emergency Declaration on March 17, 2020, on March
25, 2020, the Solicitor General of Ontario designated Provincial Offences Officers within Ontario
for the purposes of the enforcement of offences under the Emergency Measures and Civil
Protection Act (EMCPA) and the Regulations and Orders made pursuant to the Act. This
designation included all TRCA officers appointed under the Conservation Authorities Act,
through the Provincial Offences Act class designation.
In response to the Emergency Orders made under the EMCPA regarding Organized Public
Events — Certain Gatherings (O. Reg 52/20) on March 28, 2020, and the Closure of Outdoor
Recreational Amenities (O. Reg. 104/20) on March 30, 2020, TRCA officers began conducting
ongoing patrols of TRCA landholdings. Initial patrols confirmed that public parking areas were at
capacity, and in many cases, exceeding it. As a result of the ongoing community concerns and
an effort to reduce exposure risks to the public and TRCA staff, the parking areas were closed
between the period of March 28, 2020 to April 1, 2020 and continue to remain closed. The
closure of TRCA parking areas were conducted in consultation with our municipal partners in
response to the COVID-19 outbreak, and included the necessary TRCA signage to advise the
public on the restrictions at our facilities.
Collaboration with TRCA Business Partners
TRCA enforcement staff resources are limited, and TRCA Enforcement Officers are reliant on
the established partnerships with our member municipalities, police resources and provincial
agencies. At the onset of the Covid-19 crisis, our municipal partners continued to provide
invaluable assistance, resources, and collaboration to TRCA and its officers.
In order to improve public safety associated with parking, the Regional Municipality of York, in
conjunction with the City of Vaughan and TRCA, installed a series of parking restrictive barrel
cones along Rutherford Road at our trailhead to the William Granger Pathway, and installed
large electric "no parking signs' along Rutherford Road and Islington Avenue, near the access
to Boyd Conservation Area.
The Regional Municipality of Peel installed "no parking signs" along our Regional Road 50
access to Claireville Conservation Area and Albion Hills Conservation Area, in conjunction with
our closure of those parking areas, and installed a series of parking restrictive barrel cones
along Airport Road at Glen Haffy Conservation Area. In addition, the City of Brampton installed
a series or parking restrictive barrel cones at the front access to Heart Lake Conservation Area
to support TRCA efforts.
The City of Vaughan, City of Brampton, Town of Caledon and the Caledon Detachment of the
Ontario Provincial Police have been proactively enforcing safety related parking restrictions
adjacent to our facilities, while the City of Vaughan and City of Brampton are also enforcing their
Emergency Management By -Law's regarding social distancing on public lands.
The Municipalities within the York Region established a Covid-19 Regional Enforcement Task
Force, initiated by the City of Vaughan, which includes the City of Markham, City of Richmond
Hill, Town of Newmarket, the Town of Whitchurch-Stouffvilie, the Township of King, the Town of
East Gwillimbury, the Town of Georgina, the Town of Aurora, TRCA, Lake Simcoe Region
Conservation Authority, York Regional Police Service (YRP), and York Region Public Health.
The weekly conference calls have been an invaluable resource to all parties involved to identify
ongoing compliance issues and to provide a coordinated effort in addressing the challenges of
this pandemic. An example of this collaboration is YRP police presence and assistance to
TRCA around our Bond Lake and Oak Ridges Corridor Conservation Reserve (ORCCR).
Prior to the opening day of fishing season on April 25, 2020, and in response to community
concerns regarding physical distancing and gathering opportunities, TRCA Enforcement and
Compliance has been coordinating our response and communication with the Aurora
Enforcement Unit of the Ministry of Natural Resources and Forestry and our member
municipalities, including the City of Toronto with respect to our management agreement
properties.
TRCA Enforcement and Compliance and our Conservation Parks staff coordinated the opening
of seasonal camping with the City of Mississauga and the Town of Caledon By -Law
Enforcement, associated with our Indian Line and Albion Hills Campground facilities, as well as
advising them of the amended Emergency Order permitting the activity as an essential
business, in an effort to curb unnecessary community complaints being initiated and
investigated.
From the beginning of this crisis, TRCA officers and staff within other internal business units
have made a concerted effort to establish and maintain positive contacts with our member
municipalities, and continue to liaise with and monitor the status of our municipal partners and
surrounding conservation authority parks and trails.
Monitoring of TRCA Parks and Trails
Consistent with the messaging from the Province, TRCA has not restricted passive use access
to our conservation areas and trails, which are extremely popular destinations.
TRCA operates 7 conservation areas, 2 campgrounds, 1 golf course, 4 education centres, and
hundreds of kilometres of trails on 25 passive use properties, including 137 trail access points
comprised of 29 parking lots, and 108 road -side trail access points.
The redeployment of Enforcement Officers to focus on TRCA landholdings, due to COVID-19,
was essential to maintain an enforcement presence, monitor public gathering limitations and
physical distancing recommendations, to deter undesirable behaviours, and to address non-
compliance issues associated with our properties. TRCA Enforcement Officers have been
providing coverage 7 days per week, with rotating weekend shifts since April 4, 2020, while
focusing development regulation efforts on higher priority files.
TRCA Conservation Parks currently has 9 staff members designated as Provincial Offences
Officers, with 3 additional staff members with pending appointments. These staff members are
full time park supervisors and have been providing essential coverage on rotating weekend
schedules to support TRCA compliance initiatives within our conservation areas, and to provide
additional support to TRCA Enforcement Officers. The primary responsibility for these
designated staff members is park operations and maintenance, and not intended to be
enforcement focused. As weather conditions continue to improve, these staff resources will be
returning to the park maintenance program in preparation for the potential lifting of restrictions
associated with outdoor recreational facilities, similar to the recent announcement of the
opening of Provincial Parks and Conservation Reserves on May 9, 2020. This will ultimately
result in a reduction of additional staff support to Enforcement and Compliance demands.
The closure of TRCA parking areas at our more urban conservation areas and trailheads that
have an active municipal safety parking enforcement program (e.g., Boyd CA, Heart Lake CA,
Albion Hills CA, William Granger Pathway) has had the desired outcome in reducing community
concerns and non-compliance challenges. TRCA Enforcement Officers are now seeing a
marked increase in public use at our more rural landholdings in Uxbridge and north Pickering,
and at our passive use properties in Richmond Hill.
During the coordinated closure of TRCA parking facilities, an internal TRCA Lands and Trails
working group consisting of Enforcement, Restoration and Resource Management -
Conservation Lands and Trails, and our Conservation Parks business units was formed to
discuss ongoing public use of our facilities, resources and maintenance requirements, and
staffing requirements. During the weekend of May 2nd and 3rd, when temperatures reached
seasonal highs, additional TRCA staff members from Conservation Lands and Trails and
Conservation Parks were deployed as 'parks and trails ambassadors" at locations in Uxbridge
and Richmond Hill to provide for additional TRCA presence, and to provide education and
outreach to the public on TRCA expectations on the use of our trails, including gathering limits
and physical distancing recommendations. TRCA also established an after -hour private security
presence at the Bond Lake facility during improved weather conditions.
As TRCA staff health and safety is paramount, measures are adapting to this fluid situation
based on recommendations from our public health officials and our Human Resources Division.
The Enforcement and Compliance unit is taking every precaution to amend our procedures to
maintain business continuity, and to assist in alleviating additional enforcement responsibilities
to our member municipalities and police resources. TRCA Enforcement Officers are providing
for safer environments within our facilities and greenspaces and providing assurances to our
stakeholders that we are committed in maintaining our regulatory responsibilities.
TRCA officers and staff monitoring our parks and passive use trail access points have observed
that the vast majority of individuals have been respecting public gathering limits and physical
distancing recommendations, and have been appreciative of TRCA efforts to maintain outdoor
passive use of our properties, and respectful to staff, their personal space and safety. To date,
TRCA Enforcement have issued 8 verbal warnings for contraventions of EMCPA Orders, and
numerous reminders of the importance of physical distancing. There have been no charges
initiated for non-compliance with the EMCPA Orders.
Challenges
With improving weather conditions, certain TRCA facilities are being inundated with members of
the public looking for outdoor destinations, increasing public gathering and physical distancing
opportunities. The ability for TRCA enforcement to promote our messaging and be effective in
proactively addressing compliance is becoming increasingly challenging. During the month of
April, park and trail use was manageable, however, during the first weekend in May, the volume
of vehicles parked along Yonge Street at the height of the day at Bond Lake was observed to be
more than 70 vehicles alone, with several hundred people utilizing both Bond Lake and the Oak
Ridges Corridor Conservation Reserve lands.
The ability to effectively patrol the interior of our facilities, with our current enforcement
resources, is becoming increasingly difficult as foot patrols are time consuming and require two
officers to focus on a single facility or trail network, which limits an effective deterrent to our
other busy TRCA properties. We are now becoming more reliant on conducting exterior
perimeter patrols to establish a high visibility presence at our landholdings.
During the Covid-19 period between March 26, 2020 to May 12, 2020, TRCA Enforcement and
Compliance received 147 stakeholder complaints regarding issues associated with our
regulatory jurisdiction. This is a significant 258 % increase over the same period in 2019.
Complaints associated with Covid-19 make up 25 % of the total number, while 36 % are
associated with other unlawful activities occurring on our landholdings such as the use of off-
road vehicles, harvesting of resources (e.g., fiddleheads, leaks), while the remaining 39 % are
associated with our development regulations.
As additional essential businesses relating to construction and earthworks are being permitted,
and weather conditions improve, the requirement for permit compliance inspections and to
address unauthorized development activities is increasing. This is generally the period where
construction activity begins to heighten, and TRCA Enforcement and Compliance begins to
receive a significant volume of stakeholder concerns regarding development activities within our
jurisdiction. This is also the period where unauthorized development activity commences,
requiring increased attention to higher priority violation files, negotiations, and investigations.
Recognizing that Ontario has developed A Framework for Reopening our Province, which lays
out the government's approach to the next chapter in the ongoing fight to defeat COVID-19, it is
evident that the reopening of businesses, services and public spaces will be in gradual
stages. Both Parks operations and Enforcement staff will be required to continue and maintain
the current level of response and monitoring for the unforeseen future. As the reopening plan
for Ontario evolves, it is also inevitable that the "pre-COVID-19" services for Enforcement and
Compliance will have considerable pre-existing work pressures. There will be an exceptional
backlog of development permits and inspections requiring attention, coupled with the
commencement of the development season. Additional support on weekends for our
Conservation Parks and trails during the summer months will be required. The ability to
balance the necessary workload and expectations of our service delivery over the coming
months will be difficult to satisfy, due to the modest size of the Enforcement and Compliance
business unit.
Next Steps
In order to meet the increased demands on TRCA's Enforcement staff as the weather improves
and as the Province moves to the next phase of reopening, the Enforcement and Compliance
Section will be looking at internal redeployment opportunities for the business unit to have a
designated administrative coordinator assigned to screen complaints, correspond with
stakeholders and internal business units, and to provide data input support for officers relating
to complaints and inquiries. TRCA will also commence the recruitment and training to fill the
vacant Enforcement Officer position. In an effort to effectively address increasing pressures on
the business unit, stakeholder expectations and work volume, TRCA will undertake a
comprehensive review of the program and develop a business case over the next month that
will identify staffing needs, budgets and explore tools and resources that can be implemented to
meet the future needs of the program.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
Report prepared by: Brian Moyle, extension 5229
Emails: brian.movle(aD_trca.ca
For Information contact: Brian Moyle, extension 5229
Emails: brian.movle(oDtrca.ca
Date: May 13, 2020
RES.#A67/20 - REGIONAL WATERSHED ALLIANCE MINUTES
Moved by: Paul Ainslie
Seconded by: Cynthia Lai
THAT the Minutes of Regional Watershed Alliance Meeting #1/20, held on March 4, 2020,
be received.
CARRIED
Meeting #1/20, held on March 4, 2020 - Meeting Minutes Link
OUTDOOR EDUCATION TASK FORCE MINUTES
Moved by: Estair Van Wagner
Seconded by: Mike Layton
THAT the Minutes of Outdoor Education Task Force Meeting #1/20, held on January 20,
2020, be received.
CARRIED
Meeting #1/20, held on January 20, 2020 - Meeting Minutes Link
MATERIAL FROM EXECUTIVE COMMITTEE MEETING #3/20. HELD ON MAY 1, 2020
Meeting Minutes
RES.#A69/20 - SECTION III — ITEMS FOR THE INFORMATION OF THE BOARD
Moved by: Ronald Chopowick
Seconded by: Paula Fletcher
THAT Section III items 10.1.1 — 10.1.3, contained in Executive Committee Minutes #3/20,
held on May 1, 2020, be received.
CARRIED
Section III Items 10.1.1 — 10.1.3
Q1 2020 MEDIA SUMMARY
(Executive Committee Res.#817/20)
2021 PRELIMINARY MUNICIPAL LEVIES
(Executive Committee Res.#818/20)
2020 THREE MONTH FINANCIAL REPORT
(Executive Committee Res.#819/20)
Section IV - Ontario Regulation 166/06, As Amended
RES.#A70/20 - ONTARIO REGULATION 166/06, AS AMENDED
Moved by: Ronald Chopowick
Seconded by: Paula Fletcher
THAT item 10.2 — Section IV - Ontario Regulation 166/16, as amended, contained in
Executive Committee Minutes #3/20, held on May 1, 2020, be received.
CARRIED
CLOSED SESSION
RES.#A71/20 -
Moved by:
Seconded by:
CLOSED SESSION
Steve Pellegrini
Linda Jackson
THAT pursuant to Section C.4.(I) of TRCA's Board of Directors Administrative By-law, the
Board of Directors move into the closed session to discuss item 11.1 - Requested
Direction on Proposed Wetland Compensation - 11731 Tenth Line Development (McKean
Subdivision) Town of Whitchurch-Stouffville, as it pertains to a position, plan, procedure,
criteria or instruction to be applied to any negotiations carried on or to be carried on by
or on behalf of TRCA.
CARRIED
RES.#A72/20 - RECONVENE AND REPORT
Moved by: Steve Pellegrini
Seconded by: Linda Jackson
THAT the Board of Directors reconvene and report from closed session.
CARRIED
RES.#A73/20 - REQUESTED DIRECTION ON PROPOSED WETLAND
COMPENSATION — 11731 TENTH LINE DEVELOPMENT (MCKEAN
SUBDIVISION) TOWN OF WHITCH URCH-STOUFFVILLE
Moved by: Jack Heath
Seconded by: Linda Jackson
THAT confidential item 11.1 - Requested Direction on Proposed Wetland Compensation —
11731 Tenth Line Development (McKean Subdivision) Town of Whitchurch-Stouffville be
approved.
RECORDED VOTE
Paul Ainslie
Yes
Kevin Ashe
Yes
David Barrow
Absent
Shelley Carroll
Absent
Ronald Chopowick
Yes
Dipika Damerla
No Vote
Joanne Dies
Yes
Jennifer Drake
Yes
Paula Fletcher
Yes
Chris Fonseca
Absent
Xiao Han
Yes
Jack Heath
Yes
Gordon Highet
Yes
Linda Jackson
Yes
Maria Kelleher
Yes
Cynthia Lai
Yes
Mike Layton
Absent
Basudeb Mukherjee
Yes
Michael Palleschi
Yes
James Pasternak
Yes
Steve Pellegrini
Yes
Anthony Perruzza
Yes
Gino Rosati
Absent
Rowena Santos
Yes
Don Sinclair
Yes
Connie Tang
Absent
Estair Van Wagner
Yes
Jennifer Innis
Yes
AMENDMENT
RES.#A74/20
Moved by: Jack Heath
Seconded by: Linda Jackson
THAT the amendment to item 11.1 be approved.
THE AMENDMENT WAS
THE MAIN MOTION, AS AMENDED, WAS
NEW BUSINESS
RES.#A75/20 -
Moved by:
Seconded by:
MEMBER MOTION
James Pasternak
Anthony Perruzza
Ca1713I�7
CARRIED
THAT Toronto and Region Conservation Authority staff advise the Board of Directors on
the feasibility of constructing a four metre wide multi -use trail along the east side of
Black Creek between Downsview Avenue and Wilson Avenue.
CARRIED
Ward 6
City Hall, 100 Queen Street West
2"d Floor, Suite A22
Toronto, Ontario M5H 2N2
Councillor James Pasternak
Tel: 416-392-1371
Fax: 416-392-7299
cou nci I I o r_pasterna k@toronto.ca
May 20, 2020
Clerk and Manager, Policy
Toronto and Region Conservation Authority
Board of Directors
101 Exchange Avenue
Vaughan, ON L4K SR6
New Item for the May 22th, 2020, Toronto and Region Conservation Authority Board of Directors meeting
Advancing Cycling Connections in Ward 6 — Downsview Green Loop
Recommendations:
THAT the Toronto and Region Conservation Authority staff advise the Board of Directors on the feasibility of
constructing a four metre wide multi -use trail along the east side of Black Creek between Downsview
Avenue and Wilson Avenue (item "B" in Attachment #1).
The Toronto City Council approved Vision Zero program prioritizes the improvement of pedestrian and cyclist safety
everywhere in the city. Recently, the Toronto Transit commission approved the Next Stop, Even Better, 2020-2024 &
Beyond 5 -Year Service Plan & 10 -Year Outlook which encourages better pedestrian and cycling connections, to bus stops
and high frequency bus routes running on major arterial roads like Wilson Avenue and Jane Street.
The Downsview-Roding-Canadian Forces Base (CFB) neighbourhood in Ward 6 is one of the City of Toronto's 31
Neighbourhood Improvement Areas (#26). During the last decade the neighbourhood has experienced accelerated
change. As a the main corridor in the neighbourhood, Wilson Avenue between Highway 400 and Keele Street is currently
experiencing an influx of residential development applications. The community has a low walk and cycle score, and low
provision of green space along the southern edge. The Downsview-Roding-CFB neighbourhood is a community in need of
active physical fitness opportunities and improved connectivity to other neighbourhoods, parks, ravines and community
facilities.
The goal of this motion is then to works towards achieving a signed 5 kilometre long green loop active -transportation
continuous path between Jane Street, Keele Street, Downsview Dells ravine and Highway 401 (see Attachment #1), similar
to the 12 kilometre long North Scarborough Green Loop approved by Toronto City Council in 2014. The completed
Downsview Green Loop trail would connect residents to 5 schools, 5 city parks, the trail system in Downsview Dells and
Black Creek, major employment areas such as Humber River Regional Hospital and the Ministry of Transportation offices,
and shopping such as the North York Sheridan Mall.
James Pasternak
Councillor, Ward 6
Attachment #1: Downsview Green Loon Proposed Improvements
�4tip''h� r e N 'x1'� 448
MINE I1a0hwoYaP, i01 _ �. A v�apJ<
• a. uownsvrew Ave. tsaxe 3narrows l- 1,23u MI /,S\ 4 Mid -block crosswalk (Heathrow Dr .@ Heathrow Park Trail)
� 2. Exbury Rd. Bike 5harrows (" 600 M)
AL 3. Cycling boulevard trail (— 235 M) 5. Crosswalk (Downsview Ave. @ Ridge Parkd Frail)
B. TRCA Black Creek Multi -Use Trail( -250 M) Downsview Greenl_oap
t���
ia+ISY"�e'4d
�[eohe Ur
neP'
f aM1'�^�
D
N
MG[h
gercR[
n
.s
e
t,t �
�yexa
X44
` i
b
w91`��
N�
4v
scF
e
Undl
y
.•• K
d..
4. �0,� c�
4
X41
Ap
I
�4tip''h� r e N 'x1'� 448
MINE I1a0hwoYaP, i01 _ �. A v�apJ<
• a. uownsvrew Ave. tsaxe 3narrows l- 1,23u MI /,S\ 4 Mid -block crosswalk (Heathrow Dr .@ Heathrow Park Trail)
� 2. Exbury Rd. Bike 5harrows (" 600 M)
AL 3. Cycling boulevard trail (— 235 M) 5. Crosswalk (Downsview Ave. @ Ridge Parkd Frail)
B. TRCA Black Creek Multi -Use Trail( -250 M) Downsview Greenl_oap
ADJOURNMENT
ON MOTION by Ronald Chopowick, the meeting adjourned at 12:13 a.m., on May 22, 2020.
Jennifer Innis
Chair
/am
John MacKenzie
Chief Executive Officer