Loading...
HomeMy WebLinkAboutExecutive Committee 1983 ~ B-1 , the metropolitan to ronto' and region conservation authority minutes EXECUTIVE COMMITTEE 16-FEBRUARY-l983 #1/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 16-February-1983. PRESENT Chairman Mrs. F.E. Gell lTice-Chairman E.V. Kolb Members W.G. Barber M.W.H. Biggar E. Fulton Mrs. !.. Hancey H. C". !.awr ie S.A. Macpherson Ms . S . Nimmo .1.5.. Scott Clarkson, Gordon Bruce Jackson " ". !.ynne MacInnes " " Eileen Foley ABSENT Member Mrs.. N". Stoner. MINUTES Res. H Moved by: B.A.. Macpherson' Seconded by: M.W.H~ Biggar' THAT the Minutes of Meeting #20/82 b& approved. CARRIED ;' SEC'l'IOH; I ITEMS FO~ CONSIDERATIO~ l. MTRCA CLASS ENVIRONMENTA!. ASSESSMENT FOR EROSION AND SEDIMENT CONTRO!. AND C!.ASS ENVIRONMENTA!. ASSESSMENT FOR ON-SITE FLOOD CONTRO!. STRUCTURES -Withdrawal of Documents from the Environmental Assessment Act Process Res.. #"2 Moved by: Mrs'. G. Hancey Seconded by: E'.V. Kolb WHEREAS a water. management class environmental assessment is currently being prepared under the auspices of th& Association' of Conservation Authorlties of Ontario' designed. to<' be- applicable- to all ConservatioIr' Authori ties in the- Province;. THEREFORE THE EXECUTIVE' COMMITTEE' RECOMMENDS: THAT'" iIt' the interest of uniformity, the. Authori ty make formal submission' to the- Minister of the. Environment requesting that the' "Class' Environmental Assessment for Erosion' and Sediment- Control" and the;. "Class- Env ironmenta.l. Assessment fo r On-S i te Flood Con.trol Structures.'" be- wi.thdrawn: from. the: Environmental Assessment Act procesS';- AND FURTHER THAT the. Minister' be advised of the- Authority'S support for and intent to implement the "Class Environmental. Assessment fO.r Water Management Structural Measures", as prepared under the auspices:. of the Association of Conservat'ion Authorities or. Ontario' once. the: document has:. received' final approva-l.. CARRIED; B-2 -2- 2. 1ge3 BUDGET ESTIMATES Res. t3 Moved by E.V. Kolb Seconded by J.S. Scott THAT the 1983 Budget Estimates, as appended as Schedule "An of these Minutes, be received; THAT the 1983 General Budget Estimates and 1983 Capital Program, dated February 16, 1983, be adopted; AND FURTHER THAT the following action be taken: (A) All current projects included in the 1983 General Budget Estimates be approved and adopted; (B) AND WHEREAS the Conservation Authorities Act provides that, for the carrying out of any Project, an Authority shall have the power to determine the portion of total benefit afforded to all municipalities that is afforded to each of them, The Metropolitan Toronto and Region Conservation Authority therefore enacts as follows: (i) That all member municipalities be designated as benefiting for all General Current Projects included in the 1983 General Current Budget; (ii) The Authority's share of the cost of the General Current Project included in the 1983 General Current Budget, as set forth in the 1983 General Current Budget, shall be raised from all member municipalities as part of the 1983 Annual General Levy; ( iii) The 1983 Annual General Levy for Administration, Operations and Maintenance Programs, Conservation and Recreation Land Management, and the current programs of Water and Related Land Management, be apportioned to the participating municipalities in the portion that the equalized assessment of the whole are under the jurisdictton of the Authozity, unless otherwise provided in the Levy; ( iv) The appropriate Authority officials be inst=ucted to advise all municipalities pursuant to the Conservation Authorities Act and to levy the said municipalities the amount set forth in the 1983 General Current Levy; (v) The Executive Committee be authorized to reduce the said Budget and Levy, should such action be deemed expedient; (C) The 1983 Capital Works Program and the 1983 Capital Levy for Projects included therein and dated February 16, 1983, be adopted; AND WHEREAS the Conservation Authorities Act provides that an Authority may, from time to time, determine what monies will be required for Capital expenditure in connection with any projects, and further provides for the method of raising such monies from the participating municipalities; THAT the following action be taken: (a) All member municipalities be notified of the amount of such monies they are required to raise in 1983, on the basis set forth in the 1983 Capital Works Program and Levies for ( i) Land Acquisition Project 1983 (ii). Lake. Ontario Waterfront Development Project 1983. (b) The Municipality of Metropolitan Toronto. be levied for: ( i) Highland Creek Erosion Control Project 1983 (ii) Erosion Control and Slope Stabilization Project 1983 (ii i) Shoreline Management portion of Lake Ontario Waterfront Development Project 1983. (c) The Req"ional MUnicipali ty of Peel be. le"ied for the' Erosion Con.trol and Slope Stabilization Project 1983. -3- B-3 (d) The Regional Municipality of York be levied for the Erosion Control and Slope Stabilization Project 1983. (e) The Reqional Municipality of Durham be levied for the Erosion Control and Slope Stabilization Project 1983. ( f) The appropriate Authority officials be instructed to advise all municipalities pursuant to the Conservation Authorities Act, and to levy the said municipalities the amounts set forth in the 1983 Capital Works levies. CARRIED; 3. DRAFT FINANCIAL STATEMENTS FOR PERIOD ENDING DECEMBER 31, 1982 Res. i4 Moved by: J.S. Scott Seconded by: M.W.H. Biggar THAT Mr. Bruce Jackson, of the firm Clarkson Gordon, be thanked for his review of the Draft Financial Statements for the period ending December 3l, 1982; AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Financial Statements for the period ending December 31, 1982, be approved and signed by the Chairman and the Secretary-Treasurer of the Authority, and distributed in accordance with Section 39 (3 ) of the Conservation Authorities Act; AND FURTHER THAT the Supplementary Schedules be referred to the Budget and Finance Sub-Committee, when appointed, for study and report to the Executive Committee CARRIED; 4. REMUNERATION OF CHAIRMAN AND VICE-CHAIRMAN AND MEMBERS' PER DIEM AND MILEAGE Res. jt5 Moved by Ms. S. Nimmo Seconded by: S.A. Macpherson THE EXECUTIVE COMMITTEE RECOMMENDS THAT effective February ll, 1983 The Chairman's remuneration be $l9,000 00 per annum; The Vice-Chairman's remuneration be $7,500 00 per annum; The Members' per diem be $50 00. CARRIED; 5 APPOINTMENTS TO FUNCTIONAL ADVISORY BOARDS AND EXECUTIVE SUB-COMMITTEES - 1983 Res. #6 Moved by: J S. Scott Seconded by Mrs L Hancey THAT the communication having regard to appointments to the Functional Advisory Boards and Executive Sub-Committees for 1983 be received; AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the recommendations, as amended and set forth herein, be approved B-4 -4- CONSERVATION LAND MANAGEMENT Chairman: Lawrie, H.C. Appointees Bell, R E. Vice-Chairman Jackson, Don Caldwell, S.W. Members Gibson, Chris Gardhouse, G. Gillespie, R. Gurney, F. Jessop, C. McDermott, N. Lloyd, B. Stewart, M.M.R. Sutter, E.F. Yuill , R.F.M. FLOOD CONTROL AND WATER CONSERVATION Chairman Scott, J.S. Appointees Gardner, Mrs. F.E. Vice-Chalrman Herridge, W.R., QC James, Prof. R.L. Members: Crowe, R.J. Davidson, J. HOllingshead, A.D. Kelly, W.J. King, E. Martin, L. McKechnie, F.J. Prinsloo, Mrs M. Stoner, Mrs. N. Witty, J. HISTORICAL SITES Chairman Biggar, M.W.H. Appointees: Bradshaw, J. Vice-Chairman Perkins, F R McGinnis, J.A. Members Currie, D.W. Neil, Mrs. E. Dancey, R. Russell, Dr. L.S. Jackson, Mrs. L.D Scott, Dr. J.W. Kravetz, Ms. S.B. Moran, R A.P - Sutherland, Mrs. B. Thompson C. E. 0 INFORMATION AND EDUCATION Chairman Nimmo, Ms. Sandra Appointees Brown, C.G. Vice-Chairman Bryson, J A. Downing, J. Members Cook, D.L. Dunlop, W.J. Hancey, Mrs. L. Huhn, Mrs. C.C. Smoke, A.L. Leith, Dr. T H. Sutherland, W. Nelligan, B. E. Tovell, Dr. W.M Zajac, Mrs. D. WATERFRONT Chairman Fulton, Edward Appointees Breen, M J. Vice-Chairman McLean, W G Norton, G.F.R. Members Barber, W G Braithwaite, L.A. , QC Cruickshank, Mrs F Fleet, D.G. Lipton, M.D., QC Macpherson, S.A. Robertson, A. Sewell, J. Sinclair, G.B. Sm i th, M M., QC EXECUTIVE Sua-COMMITTEES Budget & Finance Chairman Scott, J.S Members Fulton, E. Kolb, E. V Hancey, Mrs L. Herridge, W.R., QC Nimmo, Ms S. Stoner, Mrs. N. Sutter, E.F -5- B-5 EXECUTIVE SUB-COMMITTEES (Contd. ) Personnel Chairman: Hancey, Mrs. L. Members Barber, W.G. Biggar, M.W.H. Bryson, J.A. Jackson, D. Lawrie, H.C. Macpherson, S.A. Recognition: Chairman: Stewart, M.M.R. Members: Barber, W.G. Prinsloo, Mrs. M. Sutherland, Mrs. B. Conservation Farm: Chairman: Kolb, E.V. Members: Bell , R.E.* Caldwell , S.W * Lawrie, H.C. Leith, Dr. T.H.* Lowe, G. * Redelmeier, F.* Wall, A.A.* Marketing Plan: Chairman McLean, W.G. Members Biggar, M.W.H. Lawrie, H C. ~immo, Ms. S. Smoke, A.L. Stewart, M.M.R. Black Creek Pioneer Village Visitor Centre Chairman Kolb, E.V. Members Barber, W.G. Biggar, M W.H. Bryson, J.A. . Macpherson, S.A. Food Service Chairman . Biggar, M.W.H. Members: Lawrie, H.C. Macpherson, S.A. ~immo, Ms. S. EMPLOYEE SUGGESTIO~ AWARD COMMITTEE Chairman Hancey, Mrs. L. *Denotes Appointment by Authority In accordance with Rule #6 - Rules for the Conduct of the Authority - Resolution #88/75, as amended, biographies of persons recommended for appointment to functional advisory boards are appended as Schedule "B" of these Minutes. CARRIED; 6 SCHEDULE OF MEETINGS - 1983 Res. P Moved by J S. Scott Seconded by Mrs. L. Hancey THAT the schedule of Executive Committee and Authority meetings, as set forth herein, be approved; THAT functional and watershed advisory board meeting dates be arranged by the Chairmen of these Boards, in consultation with the respective Division Administrators; THAT the members of the five functional boards, together with the members of the four watershed boards, be paid per diem and mileage to a maximum of four meetings per annum; any additional meetings to be authorised by the Executive Committee; AND FURTHER THAT the members of the Executive Sub-Committees be paid per diem and mileage for attendance at meetings as called by the Chairmen of the various Sub-Committees B-6 -6- FEBRUARY (February meeting schedule adopted with 1982 meetings) FRIDAY FEBRUARY 25 9 30 A.M. AUTHORITY '2 (BUDGET) MARCH Wednesday March 9 9:30 a.m. Executive '2 Wednesday March 23 9:30 a.m. Executive .3 APRIL Wednesday April 6 9 30 a m. Executive t4 Wednesday April 20 9: 30 a.m. Executive '5 MAY Wednesday May 4 9 30 a.m Executive #6 FRIDAY MAY 6 9:30 A.M. AUTHORITY '3 Wednesday May l8 9 30 a.m. Executive #7 JUNE Wednesday June 1 9 30 a.m. Executive #8 Wednesday June l5 9 30 a m E.xecutive #9 FRIDAY JUNE l7 9 30 A.M AUTHORITY #4 Wednesday June 29 9 30 am. Executive no - JULY Wednesday July l3 9 30 a.m Executive ill AUGUST Wednesday August lO 9 30 a.m. Executive #l2 SEPTEMBER Wednesday September 7 9 30 a m Executive ill3 Wednesday September 21 9 30 a m Executive #l4 OCTOBER Wednesday October 5 9 30 a.m. Executive tl5 FRIDAY OCTOBER l4 9 30 A.M. AUTHORITY #5 (PREL BUDGET) Wednesday October 19 9 30 a.m Executive #l6 NOVEMBER Wednesday November 2 9 30 a.m Executive n 7 Wednesday November l6 9 30 a m. Executive #l8 Wednesday November 30 9 30 a m Executive #19 -7- B-7 DECEMBER wednesday December 14 9: 30 a.m. Executive #20 JANUARY 1984 Wednesday January 11 9: 30 a.m. Executive #21 Wednesday January 25 9:30 a.m. Executive '22 FEBRUARY 1984 FRIDAY FEBRUARY 17 9:30 A.M. AUTHORITY TWENTY-EIGHTH ANNUAL wednesday February 22 9:30 a.m. Executive 1tl/84 MARCH 1984 FR IDA Y MARCH 2 9:30 A.M. AUTHORITY #2 (BUDGET) ANY ADDITIONAL MEETINGS REQUIRED WILL BE HELD AT THE CALL OF THE CHAIRMAN CONCERNED. CARRIED~ SECTION II ITEMS FOR INFORMATION 7. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res. t8 Moved by Mrs. L. Hancey Seconded by: M.W.H. Biggar THAT the applications listed herein as A(l) to A(9) inclusive, be approved, subject to the ~onditions contained in the reports CARRIED; A(l) Slough EstateS Limited To place fill within regulated area adjacent to the Mimico Creek, west of Airport Road, north of Derry Road, City of Mississauga Subject to (a) All work being done in accordance with Sheet #Al, Project #8474, prepared by J C. Van Huyse and forming part of the permit; (b) A temporary snow fence or other suitable barrier 'being erected along the top of the bank prior to commencement of construction and remaining in place until all construction is completed. A(2) Town of Vaughan To construct sanitary sewer crossing of Don River north of Steeles Avenue, east of Dufferin Street Subject to All work being carried out in accordance with Drawing #Al-827l0-GlA and Al-82710-PlA, as, prepared by Proctor & Redfern Ltd., and dated July, 1982. A(3) William & Lucia Morgan To construct addition to building in flood plain of the Humber River, adjacent to Wilcocks Lake, Town of Richmond Hill Subject to All work being done in accordance with the drawings forming part of the permi t. 8-8 -8- A(4) Mr. A. Mirza To replace two industrial buildings at t354A Eastern Avenue, City of Toronto (Don River Watershed) with two modern structures Subject to: All work being carried out in accordance with Drawing tAl prepared by Pierson Ltd , Engineers & Contractors, and dated January 1983 A(S) East Woodbridge Developments Ltd , To construct sanitary sewer and watermain crossing of the Robinson Creek, and storm sewer outfall south of Langstaff Road, east of Highway #27, Town of Vaughan (Humber River Watershed) Subject to: All works being carried out in accordance with the following drawings prepared by Ander Engineering Associates Ltd. File 82-112 Dwg. Nos. 8l-112-l, sheet 1 of 2 81-112-5, sheet 1 of 1 81-112-6, sheet 3 of 3 81-112-8, sheet 1 of 1 File 82-l06 Owg. Nos. 82-l06-5, sheet 2 of 2 82-106-12, sheet 1 of 1 A(6) Mr A. Roman To construct on-stream pond immediately north of Elgin Mills Road, Town of Markham (Rouge River Watershed) - Subject to (a) All surplus excavated material not being placed within the limits of the Regional Flood Line as defined by the Authority; (b) All disturbed areas being seeded and/or sodded as quickly as possible in order to avoid erosion of soil; (c) Two sediment control traps being installed downstream of the proposed construction. These traps shall remain in good working order during and up to final completion of construction; (d) The silt traps being located as shown on Drawing '1-5; (e) All work being undertaken and completed in accordance with Drawing U-5, Project tY-M 1982, dated March 1982, as prepared by D Miklas & Associates Limited. A(7) Mr Pino & Mrs. Marie Cassata To place fill adjacent to the Don River south of May Avenue, east of Kersey Crescent, Town of Richmond Hill Subject to (a) All work being done in accordance with the site plan prepared by P Salna Co. Ltd , and dated November 8, 1982; (b) All excess fill being removed from the site after completion of construction -9- B-9 A(8) The Regional Municipality of Peel To construct Derry Road East and Airport Road subway, and to re-construct Derry Road East and Airport Road, City of Mississauga (Mimico Creek Watershed) Subject to: (a) All works proposed being carried out in accordance with Drawings 81.5.1-06.10, 81.5.1B-13, 17, 21, 22, and 25 of Project 8l-406B, Derry Road East and Airport Road Subways and Reconstruction; (b) All areas disturbed during construction of the project being restored to the satisfaction of the Authority; (c) Sediment and erosion control measures being undertaken as outlined in the application for permit. A(9) City of Brampton To construct two storm sewer outfalls to the Etobicoke Creek, south of Church Street, east of Main Street, Brampton Subject to: (a) All work being done in accordance with Sheet Nos. 3 and 4, Drawing G3-29, as prepared by the City of Brampton; (b) All disturbed areas being restored to the satisfaction of the Authority. 8. CITY OF NORTH YORK -Request for Permanent Easemen~ south of Finch Avenue, east of Jane Street (Humber River Watershed) Res. #9 Moved by M.W.H. Biggar Seconded by: Mrs. L. Hancey WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the City of North York to grant a permanent easement across Authority-owned land required to facilitate a storm and sanitary sewer in the Finch Avenue, east of Jane Street area; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to cooperate with the City of North York in this instance; THAT a Permanent Easement, containing 0 l4l acres, more or less, be granted to the City of North York for a storm and sanitary sewer located south of Finch Avenue, east of Jane Street; said land being Parts of Lots l, 2, and 3, Plan MX-l05, City of North York (The Municipality of Metropolitan Toronto), designated as Part 1 on Plan 66R-l3438 Consideration to be the nominal sum of $2 00, pl us all legal, survey, and other costs; THAT said Easement be subject to an Order-in-Council being issued in accord- ance with Section 2l(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 9 CITY OF NORTH YORK -Request for Permanent Easement south of Steeles Avenue, east of Dufferin Street (Don River Watershed) Res nO Moved by Mrs. L. Hancey Seconded by W.G. Barber WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the City of North York to grant a permanent ease- ment across Authority-owned land required to facilitate a storm sewer in the Steeles Avenue/east of Dufferin Street area; - B-lO -10- AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to cooperate with the City of North York in this instance; THAT a Permanent Easement, containing 0.048 acres, more or less, be granted to the City of North York for a storm sewer located south of Steeles Avenue, east of Dufferom Street; said land being Part of Lot 25, Concession II, W.Y.S., City of North York (The Municipality of Metropolitan Toronto), designated as Part 1 on Plan 64R-9553. Consideration to be the nominal sum of $2.00, plus all legal, survey, and other costs; THAT said Easement be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; lO CITY OF MISSISSAUGA -Request for Permanent Easement for re-location of power line for construction of Hwy. #427 and Finch Avenue (Humber River Watershed) Res Hl Moved by: W.G. Barber Seconded by H.C. Lawrie WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from Mississauga Hydro-Electric Commission to grant a Permanent Easement across Authority-owned land, required to facilitate an electric power line in the Highway #427/Finch Avenue area; AND WHEREAS it is the opinion of the Authority that it is in the best . interest of the Authority, in furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to cooperate with the Mississauga Hydro-Electric Commission in this instance; THAT a Permanent Easement, containing 0 032 acres, more or less, be granted to the Mississauga Hydro-Electric Commission for an electric power line to be re-located to facilitate the construction of Highway #427 and Finch Avenue; said land being Part of Lot l3, Concession IX, E.H.S., City of Brampton (The Regional Municipality of Peel), designated as Part 1 on Plan 43R-l03l5 Consideration is to be the nominal sum of $2.00; THAT said Easement be subject to an Order-in-Council being issued in accordance with Section 2l(c) of The Conservation Authorities Act, R.S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARR IED ; ll. THE MUNICIPALITY OF METROPOLITAN TORONTO -Request for Permanent Easement north of the Queensway, west of the West Mall, Borough of Etobicoke (Etobicoke Creek Watershed) Res H2 Moved by M W.H. Biggar Seconded by S.A. Macpherson WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from The Municipality of Metropolitan Toronto to grant a Permanent Easement across Authority-owned land, required to facilitate a sanitary sewer located north of the Queensway, west of the West Mall area; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act to cooperate with The Municipality of Metropolitan Toronto in th i s instance; -11- B-ll THAT a Permanent Easement containing a total of 0.402 acres, more or less, be granted to The Municipality of Metropolitan Toronto for a sanitary sewer located north of the Queensway, west of the West Mall; said land being Part of Lot 13, Concession IV, C.S.T., Borough of Etobicoke (The Municipalitr of Metropolitan Toronto), and Part of Lot 13, Registered Plan 598, Clty of Mississauga (The Regional Municipality of Peel), designated as Part 1 on Plan 64R-9692 and Part 1 on Plan 43R-1059l. Consideration to be the nominal sum of $2.00, plus all legal, survey, and other costs; THAT said Easement be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 12. LAND ACQUISITION PROJECT 1982-1984: DON RIVER WATERSHED -Property: Greenway Homes Limited, West side Leslie Street, south of Steeles Avenue, City of North York Res U3 Moved by: Mrs. L. Hancey Seconded by: W.G. Barber THAT the report (January 31, 1983) set forth herein, received from the Manager, Property & Administrative Servgices, be adopted, and tha t the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re Project: Land Acquisition Project 1982-l984: Flood Plain and Conservation Land Component - Don River Watershed . Authority Executive Resolution t88, Meeting H - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property West side of Leslie Street Owner Greenway Homes Limited Area to be acquired 0.l03 acres, more or less Recommended purchase price Nominal consideration of $2.00 "Included in the requirements for the above-noted project is an irregularly-shaped parcel of land, being Block 20, Plan M-l923, City of North York (The Municipality of Metropolitan Toronto) , located on the west side of Leslie Street, south of Steeles Avenue "Negotiations have been conducted wi th the owner, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2.00, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the clos i ng , for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive conveyance of the land required free from encumbrance. "A map showing the general location of the property is attached. A plan illustrating the specific location will be available at the meeting "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources fo r an Inspection Certificate "Funds are available for this acquisition - Account 0-04-ll-401 - Flood Control Acquisition." B-l2 -l2- 13. LAND ACQUISITION PROJECT 1982-l984 HUMBER RIVER WATERSHED -Property: George W.L. & Helena Mary Fox #40 John Street, Bolton, Town of Caledon Res. #14 Moved by: E. Fulton Seconded by H.C. Lawrie THAT the report (February 4, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re Project Land Acquisition Project 1982-1984 - Flood Plain and Conservation Land Component Humber River Watershed Authority Executive Resolution t88, Meeting #4 - Apr il 8, 1981, and Authority Resolution '38, Meeting #3 - May 15, 1981 Subject property: #40 John Street, Bolton Owners George W.L. & Helene Mary Fox Area to be acquired a) . 0.091 acres, more or less - purchase b) 0.032 acres, more or less - permanent easement Recommended purchase price $4,000.00, plus vendors' legal costs and replacement of trees with suitable landscaping "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residental property, being Part of Lot 80, Registered Plan BOL-7, Town of Caledon (The Reg ional Municipality of Peel) This land is required for the Bolton channelization works This transaction also includes the acquisition of a Permanent Easement for maintenance of the flood control works. "Negotiations have been conducted with the owners and their so-licitor, Mr J. K~nneth Kidd, Q.C., #604 Federal Building, 85 Richmond Street West, Toronto, Ontario, M5H 2C9, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $4,000 00, plus vendors' .legal costs and replacement of trees with suitable landscaping, with date of completing this transaction to be as soon as possible The purchase also includes payment in full for the Permanent Easement and any dis- turbance resulting from the construction. "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive conveyance of the land required free from encumbrpnce, with the following exceptions, the precise wording of which is to be drafted by the Authority's solicitor a) should the land cease to be required for flood control purposes, the owner is to have the right to re-purchase; b) . the Authority shall not take any action to substantially inter- fere with the flow or course of the Humber River adjoining the owners' land, except during periods of above-average occurrence and volume caused as a result of flooding, storms, or otherwise. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-ll-40l - FLood Control Acquisition; " -13- B-13 14. LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property: The Municipality of Metropolitan Toronto East side Black Creek Drive, north of Indus~ry Street, City of North York Res. t15 Moved by: Mrs. L. Hancey Seconded by: S.A. Macpherson THAT the report (January 28, 1983) set forth herein, received from the Manager, Property & Administrative Services; be adopted, and that the Secretary-Treasurer be authorized and directed to complete th~ purchase. CARRIED; "Re: Project: Land Acquisition Project 1982-1984 - Flood Plain and Conservation Land Component Humber River Watershed Authority: Executive Resolution t88, Meeting '4 - April 8, 1981, and Authority Resolution '38, Meeting 13 - May 15, 1981 Subject property: East side of Black Creek Drive, north of Industry Street Owner The Municipality of Metropolitan Toronto Area to be acquired: 1.216 acres, more or less Recommended purchase price Nominal consideration of $2.00 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being All of Block 'F', Registered Plan 5759, City of North York (The Municipality of Metropolitan Toronto), located on the east side of Black Creek Drive, north of Industry Street. "Negotiations have been conducted wi th officials of The Municipali ty of Metropolitan Toronto, and, subject to the approval of your Committee, agree- ment has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal fir!ll Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive conveyance of the land required free from encumbrance, with the exception of any existing registered easements "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-ll-40l - Flood Control Acquisition." l5 LAND ACQUISITION PROJECT 1982-l984 ETOBICOKE CREEK WATERSHED -Property: Ontario Hydro North side of the Queensway, east of Dixie Road, City of Mississauga Res #l6 Moved by E Fulton Seconded by M.W.H. Biggar THAT the report (January 27, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re Project Land Acquisition Project 1982-l984 - Flood Plain and Conservation Land Component Etobicoke Creek Watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 B-l4 -l4- Subject property: North side of the Queensway Owner Ontario Hydro Area to be acquired 2.651 acres, more or less Recommended purchase price $6,628.00 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lot 3, Concession I, City of Mississauga (The Regional Municipality of Peel), fronting on the north side of the-Queensway, east of Dixie Road "Negotiations have been conducted with officials of Ontario Hydro and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $6,628.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive conveyance of the land required free from encumbrance, with the exception of any existing registered easements. "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Reources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-ll-40l - Flood Control Acquisition." l6 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property Colleen Mary Murphy #30 John Street, Bolton Res #l7 Moved by J.S. Scott . Seconded by S.A. Macpherson THAT the report (February l6, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re Project Land Acquisition Project 1982-l984 - Flood Plain and Conservation Land Component Humber River Watershed Authority Executive Resolution #88, Meeting #4 _ April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property #30 John Street Owner Colleen Mary Murphy Area to be acquired a) 0 035 acres, more or less - purchase b). 0.016 acres, more or less - permanent easement Recommended purchase price $4,500 00, plus vendor's legal costs and replacement of trees with suitable land- scaping, together with construction of a 4' chain link fence "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residential property, being Part of Lots l85 and 25, Plan BOL-7, Town of Caledon (The Regional Municipality of Peel) This land is required for the Bolton channelization works. This transaction also includes the acquisition of a Permanent Easement for maintenance of the flood control works. "Negotiations have been conducted wi th the owner, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows -15- B-15 The purchase price is to be the sum of $4,500.00, plus vendor's legal costs and replacement of trees with suitable landscaping, together with construction of a 4' chain link fence, with date of completing this transaction to be as soon as possible. The purchase also includes payment in full for the Permanent Ease- ment, and any disturbance resulting from construction. AI recommend approval of this purchase, and that the lagal firm of Gardiner, Roberts be instructed to complete the purhcase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance, with the following exceptions, the precise wording of which is to be drafted by the Authority's solicitor: a). should the land cease to be required for flood control purposes, the owner is to have the right to re-purchase~ b). the Authority shall not take any action to substantially inter- fere with the flow or course of the Humber River adjoining the the owner's land, except during periods of above-average occurrence and volume caused as a result of flooding, storms, or otherwise. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-11-401 - Flood Control Acquisition." l7 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property Peter J. & Caecilia M. Terhart #176 King Street East, Bolton Res. #18 Moved by: Mrs. L. Hancey Seconded by: E. Fulton . THAT the report (February 16, 1983) set fo~th herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED~ "Re: Project Land Acquisition Project 1982-l984 - Flood Plain and Conservation Land Component Humber River Watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property #l76 King Street East Owners: Peter J. & Caecilia M. Terhart Area to be acquired a) 0.040 acres, more or less - purchase b) 0.Ol8 acres, more or less - permanent easement c) 0.020 acres, more or less - temporary easement Recommended purchase price $4,000.00, plus vendors' legal costs, construction of a 4' vinyl chain link fence, and replacement of trees with suit- able landscaping "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residential property, oeing Part of Lot 185, Plan BOL-7, Town of Caledon (The Regional Municipality of Peel) This land is required for the Bolton channelizatlon works. This .ransaction also includes the acquisition of a Permanent Ease- ment for maintenance of the flood control works; and a Temporary Easement for a period of three months to facilitate construction B-16 -l6- "Negotiations have been conducted with the owners, and, subj ect to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $4,000.00, plus vendors' legal costs, construction of a 4' vinyl, chain link fence, and replacement of trees with suitable landscaping. The purchase also includes payment in full for the Permanent and Temporary Easements, and any disturbance resulting from the construction, together with an amount to cover the owners' concerns regarding injurious affection. "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive conveyance of the land required free from encumbrance, with the following exceptions, the precise wording of which is to be drafted by the Authority's solicitor: a) . should the land cease to be required for Flood Control purposes, the owner is to have the right to re-purchase; b) . the Authority shall not take any action to substantially inter- fere with the flow or course of the Humber River adjoining the owners' land, except during periods of above-average occurrence and volume caused as a result of flooding, storms, or otherwise "The Administrator of the Water Resource Division has reviewed' this pro- posed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-ll-40l - Flood Control Acquisition. "This recommendation, upon adoption will supersede Resolution #423 adopted by the Executive Committee of the Authority at #20/82 held 1983.01.26." l8 AQUATIC PARK -City of Toronto Proposal for Leslie Street Spit . Res U9 Moved by: E. Fulton Seconded by W G. Barber THAT the Clause embodied in Report #2 of the Neighbourhoods Committee, as adopted by the City of Toronto COuncil at its meeting held January lO, 1983, be received; THAT the City of Toronto's recommendations with respect to the Leslie Street Spit be referred to the Aquatic Park Planning Task Force for consideration; AND FURTHER THAT the City of Toronto be so advised. CARRIED; 19 QUOTATION #CLM83-01 -Two Diesel Tractors The following complete quotations have been received for the supply and delivery of two 1983 Diesel-powered tractors similar to Ford Model 3610 Westmetro Ford $29,564 lO Ken Maynard 37,034 74 (1982 model *1040) Ken Maynard 39,138.63 (l983 model *2lS0) The following incomplete quotation was received The quotation did not display the company seal as required Edwards Equipment $28,890 00 The above prices include all applicable taxes Res #20 Moved by Mrs. L Hancey Seconded by: J.S. Scott THAT the quotation of Westmetro Ford Sales Ltd for the supply and delivery of two (2) new 1983 Diesel-powered tractors, similar to Ford Model 3610, in the sum of $29,564 lO, including all applicable taxes, be accepted; it being the lowest proper quotation received CARRIED; -17- B-17 20. QUOTATION iCLM83-02 -Two Diesel Tractors with Loaders The following quotations have been received for the supply and delivery of two (2) 1983 Diesel-powered tractors similar to Ford Model 4110 tractor and Model 776B Quicktach loader: Westmetro Ford $45,123.60 Ken Maynard 52,754.15 (1982 model 1640) Ken Maynard 54,213.05 (1983 model 2350) Edwards Equipment 56,496.00 (MF270) Res. #21 Moved by: Mrs. L. Hancey Seconded by: J.S. Scott THAT the quotations of Westmetro Ford Sales Ltd. for the supply and delivery of two (2) new 1983 Diesel-powered tractors with front end loader, similar to Ford Model 4110, and a Ford 776B Quicktach loader, in the sum of $45,123.60, includiny all applicable taxes, be accepted; it be i ng the lowest proper quotat on received. CARRIED; 21- QUOTATION #CLM83-03 -Cold Creek Conservation Area: Targets & Ammunition The following quotations have been received for the supply of Clay Bird targets and ammunition for re-sale at Cold Creek Conservation Area l,500 cases Clay Birds - FLuorescent Orange: Lawry Shooting Sports Ltd. $ 9,450.00 Searle SHooting Supplies Ltd. 10,215.00 Hallam Sporting Goods Ltd. No quote Ammunition Hallam Sporting Lawry Shooting Searle Shooting Goods Ltd. Sports Ltd Supplies Ltd. . 100 cases l2 ga. (No 7-l/2 - l-oz.) $l3,lOO.00 $13,300.00 No quote lO cases 20 ga. l,320.00 l,340.00 $l,320 00 3 case .22 cal 618.00 624 00 666.75 $l5,038.00 $l5,264.00 $1,986 00 All prices are PST exempt. Res #22 Moved by: Mrs L. Hancey Seconded by J S. Scott THAT the quotations for the supply of targets and ammunition to the Cold Creek Conservation Area for re-sale, be accepted as follows, they being the lowest acceptable quotations received Lawry Shooting Sports Inc. for the supply of the 1983 requirements for l,500 cases of Clay Bird targets, in the sum of $9,450.00, PST exempt; Hallam Sporting Goods Ltd. for the supply of lOO cases l2 gauge (No 7-1/2 l-oz.) ; 10 cases 20 gauge, and 3 cases 22 calibre shells, in the sum of $15,038.00, PST exempt. CARRIED; 22 QUOTATION ilCLM83-04 -Three Mott Mowers The following quotations have been received for the supply and delivery of three (3 ) new 1983 Mott 88CC mowers: Duke Lawn Equipment $l2,073.88 Nobleton Farm Service l2,09l.00 Clark Moore Motors l2,823.95 The above prices include both Federal and Provincial Sales Taxes. B-18 -18- Res. t 23 Moved by Mrs. L. Hancey Seconded by: J.S. Scott THAT the quotation of Duke Lawn Equipment for the supply and delivery of three (3) Mott 88CC mowers in the sum of $12,073 88, including all applicable taxes, be accepted; it being the lowest proper quotation received. CARRIED; 23. QUOTATION tCLM83-07 -Plastic Garbage Bags . The following quotations have been received for the supply of plastic garbage bags for Authority operations: 20,000 26" x 36" x 2mil, 5,000 35" x 50" x 3mil, and 10,000 22" x 24" x 2mil bags. Quotations include all taxes: Poly Tarp Co. $ 2,896.22 Apache Plastics 2,949.57 Fenton Products 3,167.63 F&B Industrial Hardware 3,520.73 Res. #24 Moved by Mrs. L. Hancey Seconded by J.S. Scott THAT the quotation of Poly Tarp Co for the supply of 20,000 26" x 36" x 2mil and 5,000 35" x 50" x 3mil, and 10,000 22" x 24" x 2mil plastic garbage bags, in the sum of $2,896.22, including all taxes, be accepted; it being the lowest quotation received. CARRIED; 24. QUOTATION tCLM83-08 -Conservation Areas' Operations: Paper Products The following quotations have been received for the supply of paper products for use in Conservation Areas and other facilities operated by the Authority. The quotations cover 500 cases of rolled toilet paper, 100 cases of single-fold towel, and lOO cases rolled towel. The prices include 7% provincial Sales Tax. . Fenton Products $l2,761.89 Kimberley Clarke l3,056.14 G.H. Wood 15,050.62 Res #25 Moved by Mrs. L. Hancey Seconded by J S Scott THAT the quotation of Fenton Products for the supply of 500 cases rolled toilet paper, lOO cases single-fold towel, and lOO cases rolled towel, in the sum of $12,761.89, including 7% Provincial Sales Tax, be accepted; it being the lowest quotation received CARRIED; 25 KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Exhibit Proposal Res. #26 Moved by: E.V. Kolb Seconded by Ms. S. Nimmo THAT the contract for the design, development, fabrication, and installation of indoor exhibits for the Renewable Energy Theme Program at the Kortright Centre for Conservation be awarded to the firm Renewable Energy in Canada, at a cost of $40,000.00 CARRIED; 26 REPORT #5/82 - FOOD SERVICES SUB-COMMITTEE Res. #27 Moved by E.V Kolb Seconded by: W G. Barber THAT Report #5/82 of the Food Services Sub-Committee be received; AND FURTHER THAT the following action be taken -19- B-19 (a) The salary schedule for Supplementary Service staff, as appended as as Schedule nCn of these Minutes, be approved~ (b) The Authority's Personnel Manual be amended accordingly~ (c) The 1983 Budget Estimates for Authority Food Services for the period March 1st to December 31st, 1983, as appended as Schedule nOn of these Minutes, be approved~ (d) The 1983 Budget Estimates for Authority Food Services be included in the 1983 Budget Estimates of the Authority. CARRIED~ 27. 1983 SALARY INCREASES TO INFORMATION AND EDUCATION EDUCATIONAL ASSISTANTS Res. t28 Moved by: E.V. Kolb Seconded by: S.A. Macpherson THAT the 1983 salary range for Educational Assistants be established at $40.00-$45.00-$51.50/day~ AND FURTHER THAT the 1983 salary range for Education Program Coordinators be established at $58.80-$64.00/day. . CARRIED~ 28 EXPERIENCE PROGRAM Res. 129 Moved by: H.C. Lawrie Seconded by: S.A. Macpherson THAT the staff communication, together with the copy of letter dated January 24, 1983, to The Honourable Margaret Birch, Provincial Secretary for Social Development, from J R. Powell, Executive Director, Association of Conservation Authorities of Ontario, having regard to the Experience Program, be received for information. CARRIED; 29. ONTARIO NATURAL HERITAGE LEAGUE Res #30 Moved by: . M.W.H. Biggar Seconded by: S.A. Macpherson THAT the staff communication, together with correspondence dated January 31, 1983, from J R. Powell, Executive Director, Association of Conservation Authorities of Ontario, to Chief Administrative Officers of the Ontario Conservation Authorities having regard to the Ontario Natural Heritage League, be received and filed. CARRIED; 30 ORIENTATION SEMINAR Res #3l Moved by E.V. Kolb Seconded by: S A. Macpherson THAT an Orientation Seminar be held for Authority Members on Tuesday, February 22, 1983, at the Authority Office, 5 Shoreham Drive, Downsview, commencing at 5 30 pm. ~ AND FURTHER THAT per diem and mileage be paid for attendance of members at the seminar CARRIED; 31 1983-l984 APPOINTMENTS TO THE ASSOCIATION OF CONSERVATION AUTHORITIES OF ONTARIO BOARD OF DIRECTORS Res #32 Moved by S.A Macpherson Seconded by W G. Barber THAT Mrs Florence Gell, Chairman, be designated the representative of The Metropolitan Toronto and Region Conservation Authority on The Association of Conservation Authorities of Ontario Board of Directors CARRIED; 32 TERMINATION On motion, the meeting terminated at 1 00 P m , February 16. Mrs. Florence Gell W E. Jones Cha 1 rman Secretary-Treasurer KC. - ., - THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 1983 BUDGET ESTIMATES Authority February 25, 1983 en 0 t1: trl 0 Q fu II1 . I ", '" = 0 1983 BUDGET ESTIMATES SOURCES OF FUNDS ALLOCATION OF FUNDS 0 percent Operations 79 'c. S3,91O,OOO percent Capital 21% .21' .fJt ~ '01 ~~ ...,2,.0 o 0 0 16% $2,950,000 TItE HETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 1983 PRELIHINARY BUDGET ESTIHATES I N D E X Pagels) Pagels) BUDGET REPORT & PROVINCIAL FUNDING 1-1-8 Erosion Control - York - Program Description V-IO HUNICIPAL LEVIES AND BASIS OF APPORTIONMENT 11-1-3 - Program Budget Summary V-ll Erosion Control - Durham BUDGET SUHHARY II 1-1-4 - Program Description V-12 - Program Budget Summary V-13 THE FINANCE & ADMINISTRATION DIVISION Planning & Remedial Heasures - Division Description - Goals & Responsibilities IV-l - Program Description V-14 - 1982 Achievements - 1983 priori ties IV-2 - Program Budget Summary V-IS - Division Budget Summary IV-3 Haintenance - Small Dams, Channels, Erosion - Administration - Program Description IV-4 Control Structures - Program Description V-16 - Program Budget Summary IV-5 - Program Budget Summary V-17 - General Expenses - Program Description IV-6 Rive~ Forecasting Operations - Halntenance - Program Budget Summary IV-7 Water Control Structures - Budget Revenue Detail IV-8 - Program Description V-18 - Property Acquisition - Haintenance & - Program Budget Summary V-19 Hanagement - Program Description IV-9 - Waterfront - Division Budget Summary V-20 - Program Budget Summary IV-IO Administration - Program Description V-21 - Vehicle & Equipment Purchases - New & - Program Budget Summary V-22 Replacement - Program Description IV-II Shoreline Hanagement - Program Description V-23 - Program Budget Summary IV-12 - Program Budget Summary V-24 Lake Ontario Waterfront Development THE WATER RESOURCE DIVISION - Program Description V-2S - Division Description - Goals & Responsibilities V-I - Program Budget Summary V-26 - 1982 Achievements - 1983 priorities V-2 - Flood Control - Division Budget Summary V-3 THE CONSERVATION LAND HANAGEMENT DIVISION Administration - Program Description V-4 - Division Description - Goals & Responsibilities VI-1 - Program Budget Summary V-5 - 1982 Achievements - 1983 priorities VI-2 Erosion Control - Metropolitan Toronto - Division Budget Summary VI-3 - Program Description V-6 - Program Administration - Program Description VI-4 - Program Budget Summary V-7 - Program Budget Summary VI-S Erosion Control - Peel - watershed Recreation - Planning - Program Description V-8 - Program Description VI-6 - Program Budget Summary V-9 - Program Budget Summary VI-7 - 2 - Page(s) Page(s) TilE CONSERVATION LAND MANAOEMENT DIVISION contd - Community Relations - Information - Watershed Recreation General - Program Description VII-6 Development - Program Description VI-8 - Program Budget Summary VII-7 - Program Budget Summary VI-9 I Resource Management Programs Operations and Maintenance - Program Description VII-8 - Program Description VI-lO - Program Budget Summary VII-9 - Program Budget Summary VI-ll Planning/Marketing Analysis Program Budget Revenue Detail VI-12 - Program Description VII-lO - Conservation Land Management - Program Budget Summary VII-ll Land Management - Program Description VI-13 - Communit Relations - Conservation Education - Program Budget Summary VI-14 Superv a on, Operat ona & Ma ntenance Conservation Planning - Program Description VII-12 - Program Description VI-IS - Program Budget Summary VII-13 - Program Budget Summary VI-16 Kortright - Program Description VII-14 Glen lIaffy Fish Rearing - Program Budget Summary VII -15 - Program Description VI-17 Development - Program Description VII-16 - Program Budget Summary VI-18 - Program Budget Summary VII-17 Non-Revenue Properties - Program Description VI-19 THE IIISTORICAL SITES DIVISION - Program Budget Summary VI-20 - Division Description - Ooals & Responsibilities VIII-l - 1982 Achievements - 1983 priorities VIII-2 - Division Budget Summary VIII-3 TilE INFORMATION & EDUCATION DIVISION - Herita~e - Program Description VI II-4 Admin stration - Division Description - Goals & Responsibilities VII-l - Program Budget Summary VIII-S - 1982 Achievements - 1983 priorities VII -2 Black Creek Pioneer Village - Operations & - Division Budget Summary VII-3 Maintenance - Program Description VIII-6 - Program Administration - Program Description VII-4 - Program Budget Summary VIII-7 - Program Budget Su~nary VII-S Education Program - Program Description VIII-8 - Program Budget Summary VII I -9 Capital Development - Program Description VIII-IO - Program Budget Summary VIII-ll Page 1-1 1983 BUDGET ESTIHATES Authority Purpose, Achievements and Objectives The Hetropolitan Toronto and Region Conservation Authority adopted a comprehensive Watershed Plan on December 5, 1980, to establish long-range goals in nine program areas specific to the 3467 square kilometres within Authority jurisdiction. The adoption of the Plan is in compliance with the direction of the Conservation Authorities Act to undertake a program designed to further the conservation, restoration, development and management of natural resources and of the Province of Ontario to study and investigate the watershed and prepare and file with its member municipalities and the Minister of Natural Resources, a Watershed Plan. The Watershed Plan has been filed with, and concurred in by, the Authority's member municipalites and the Director, Central Region, Hinistry of Natural Resources. The Authority, in the Plan, has identified the river valleys, the Lake Ontario shoreline and the headwaters of the Oak Ridges interlobate moraine and the Niagara Escarpment as the major resources to which its programs are applied. The Watershed Plan is comprised of nine (9) interrelated programs: The basic requirement of the Authority is to provide protection to human life and property from the hazards of flooding and erosion. The Flood Control Program and three complementary programs, Erosion and Sediment Control, Storm Water Hanagement and Conservation Land Hanagement, establish the means to accomplish this objective and recognize the relationships between rural and urban drainage, erosion and sedimentation, and flooding. Flood Control Program - Provides for remedial measures, land acquisition and the administration of regulatory measures to maintain flood plains unobstructed to ensure the passage of flood flows. I Erosion and Sediment Control Program - Provides for corrective works and the administration of regulatory measures to protect life and property. Storm Water Hanagement Program - Establishes a basis for co-operative action by the Authority and its member municipalities with respect to water management problems and the preparation of master drainage plans. Conservation Land Hanagement Program - Promotes conservation on private and public lands by providing reforestation, habitat improvement, stream improvement and a conservation planning service. Land Acquisition Program - Provides for the acquisition of flood plain and valley lands, waterfront lands and environmentally significant lands to ensure proper conservation land management. The hectares of land acquired by the Authority are being managed to achieve the objectives of the Watershed Plan. Lake has two components, Shoreline Hanagement to reduce the hazards of and Development to create water-oriented recreation opportunitie~. ~ Page 1-2 Watershed Recreation Program - Enables the development and operations of recreation areas for public use and enjoyment, a valuable ancillary benefit on conservation lands Heritage Conservation Program - Recognizes the special contribution that an historical perspective gives to the understanding of resource management. Community Relations Program - Establishes the means by which the Authority can communicate with the community in order to gain understanding and acceptance of its conservation programs. The 1983 Budget Estimates derive from the Watershed Plan reflecting a strong orientation to Water and Related Land Management Programs and emphasizing planning, regulatory and environmentally acceptable solutions to water management problems. The Budget proposals also address a number of administrative matters: - disposition of municipal levies on hand - provision for gapping, set at 1\ of full-time wages, salaries and benefits - identification and allocation of interest income. The adoption of this Budget will not enable the Authority to maintain the level of service provided to the community in 1982 and will not enable the Watershed Plan objectives to be implemented at the rate anticipated on adoption. Format of Presentation . The 1983 Budget Estimates are based on the same program management format as the 1982 budget format. The format is designed to identify more clearly the programs adopted by the Authority in its Watershed Plan. In addition, the budget estimates are organized into management units to more clearly identify and manage the Authority programs. The principles of program budget management have been used to develop the 1983 Budget Estimates. There are five major types of provincial grants available through the Ministry of Natural/Resources to Conservation Authorities: 1. Administration 2. Water and Related Land Management 3 Conservation and Recreation Land Management 4. Special Projects and Programs 5. Supplementary Grants (not applicable to MTRCA). Commencing in the 1983 budget year, the Ministry of Natural Resources recommends the payment of grants to authorities based on a priority ranking system, using technical criteria, which compares the 'need' for individual projects in a province-wide matrix. Page 1-3 Authority Programs l. Finance and Administration (a) Program Administration (b) General Expense (c) Property Acquisition and Maintenance and Management 2. Water and Related Land Management - Flood Control . (a) Program Administration (b) Erosion and Sediment Control - Metropolitan Toronto - Peel, York and Durham (c) Flood Control - Planning and Remedial Measures - River forecasting operations, Maintenance of Water Control Structures - Maintenance, Small Dams, Channels, Erosion Control Sites 3. Special Projects - Lake Ontario Waterfront Development (a) Program Administration (b) Waterfront Development (c) Shoreline Management: Remedial works, and management of works. 4. Conservation Land Management (a) Program Administration (b) Watershed Recreation - Planning - Conservation Area Development - Operations and Maintenance (c) Conservation Land Management - Planning - Conservation Management - Conservation Management (Flsh Rearing) - Operations and Maintenance Page 1-4 5. Information and Education (a) Program Administration (b) Community Relations - Information - General - Resource Management - Planning, Market Analysis - Conservation Education - Supervision, Operations, Maintenance - Supervision, Operations, Maintenance (Kortright) (c) Conservation Education Development 6. lIistorical Sites (a) Program Administration (b) Operations and Maintenance (c) Capital Development Expenditures on administration, operations and maintenance, and current programs comprise the Authority's General Levy on all participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario. Expenditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in specific projects. Certain expenditures from special revenues and levy on hand are recommended. tand Acquisition Project, 1982-1984 This froject was adofted br the Authority and approved by the municipalities on the basis of a 55' grant and all member munic palities benef ting n proportion to their equalized assessment. The Authority plans an expenditure of $550,000. for 1983, of which $247,500, being the municipal share, will be funded from levy monies on hand. Lake Ontario Waterfront Development Project, 1983 This project was adopted br the Authority and approved by the municipalities on the basis of a 50' grant and all member municipalities benefiting n the same proportion as that determined for the 1977-1981 project. The budget estimates for this project are found in the Finance and Administration (Waterfront Open Space Land Acquisition and Hazard Land Acquisition) and the Water Resource Division sections of the budget document. The Shoreline Management component is budgeted on the basis of a 55' grant for 1983, as directed by the Ministry of Natural Resources. Page 1-5 Projects for Erosion Control and Slope Stabilization in the Municipality of Metropolitan Toronto and the Regional Municipal ities of Peel, York and Durham, 1982-1984. These projects were adopted by the Authority and approved by the municipalities on the basis of a 55' grant and each municipality benefiting for the works carried out in the municipality. The annual municipal funding requirement is: Metropolitan Toronto 173,250 Peel 13,500 . York 9,000 Durham 2,250 $ 198,000 These projects are budgeted for in 1983 as submitted. Project for Channel Improvements - Main Humber River, Village of Bolton and Town of Caledon, 1982-1983. All approvals are in hand for the 1982 project and, due to increased costs, an addendum to the project has been submitted for approval. In both instances, the project will be funded by the Province of Ontario. The 1983 Levy The apportionment of the 1983 municipal levy is based on the 'discounted' equalized assessment in the Authority, in accordance with information supplied to all Conservation Authorities by the Ministry of Natural Resources. In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied an amount equal to 100\ of the 1982 taxes paid by the AuthorIty for revenue producing conservation areas within those mun icipaU ties. within Metropolitan Toronto, Authority lands are not subject to taxation. Provincial Funding The provincial grant structure used in these estimates is based on the fOllowing approved percentages: Administration 50\ Water and Related Land Management 55\ Conservation and Recreation Land Management 50\ Waterfront Plan (excluding shoreline management) 50\ Shoreline Management 55\ Page 1-6 The Authority has obtained approval for the following level of funding from the province of Ontario to finance the programs set forth in the 1983 Budget Estimates. Rate Requested of Grant 1983 Approved 1983 Actual 1982 , $ $ $ $ $ ADMINISTRATION A 1 to A6 inclusive 50 689,640 690,000 656,780 ==;::rCl==~ Q;a=:::;aIZC:Z_ l:Ia=:;;Z==2: WATER & RELATED LAND MANAGEMENT PROGRAM ADMINISTRATION Flood Control - Wages, benefits & expenses 55 400,900 367,147 Operation and maintenance of water control 55 200,000 149,409 Conservation services 55 130,000 132,795 Forest management 55 31,525 Community relations 55 99,000 100,984 Taxes and insurance 55 l5l,00~ 111,925 SUB TOTAL 999,033 1,012,425 862,260 SURVEYS & STUDIES Master drainage planning 55 11 , 000 6,134 preliminary engineering 55 39,765 Environmental studies 55 21,562 SUB TOTAL 32,175 11,000 67,461 Page 1-1 Rate Requested of Grant 1983 A~proved 1983 Actual 1982 \ $ $ $ $ WATER , RELATED LAND MANAGEHENT (CONTO) CAPITAL Interim Water , Related Land Management Project Bolton channelization * 530,100 352,000 lIighland Creek 55 52,174 Oak Ridges 55 24,140 Flood control hazard land acquisition 55 150,000 312,102 Waterfront hazard land acquisition 55 339,011 Erosion Control 55 194,525 251,350 SUB-TOTAL 1,335.,850 814,625 1,352,583 Floodline mapping 90 31,428 Waterfront shoreline management 55 210,000 205,300 Keating Project 55 23,171 SUB-TOTAL 320,315 270,000 266,505 TOTAL WATER AND RELATED LAND MANAGEHENT 2,681,433 2,168,050 2,548,809 =-=::II=*==-C= .::118=.1:;1=_10= CI=:a"~ZS==Q * Funded 100\ provincially through grants and funds on hand (escrow) from the sale of Authority lands. , Page 1-8 Rate Requested of Grant 1983 Approved 1983 Actual 1982 , $ $ $ $ $ CONSERVATION , RECREATION LAND HANAGEHENT PROGRAH ADHINISTRATION . Salaries, wages , expenses * 50 750,000 721,756 Information and interpretation 50 28,140 38,047 Taxes and insurance 50 40,460 28,922 SUB-TOTAL 843,777 818 , 600 788,725 SURVEYS AND STUDIES Boyd Master Plan 50 37 ,500 38,229 SUB TOTAL 37,500 37,500 38,229 CAPITAL Conservation area development 50 80,000 67,234 Waterfront open space land acquisition 50 166,102 Waterfront development 50 632,000 557,015 SUB TOTAL 941,205 712,000 790,351 TOTAL CONSERVATION , RECREATION LAND MANAGEMENT 1,822,482 1,568,100 1,617,305 ~g~_._ClIJ:lCI a=_acaa:::lla DIZ;:ICI.a:a:amCl TOTAL FUNDING 5,199,555 4,426,150 4,822,894 ..==--==ut:lu=- aaaz:r=mm== a=-===-==== The Authority has received H.A.20/83 authorizing grants of $4,426,150, as outlined above. The difference between the level of provincial funding requested and that approved will be requested during 1983. Works eligible for grant will not proceed unless grants or their equivalent, to match levy funds, are made available. * includes divisional administration budgets for Waterfront, Conservation Land Hanagement, Information and Education and Historical Sites. Page II-I 'l1IE ME:l'ROOOLITAN TOROtll'O AND IUXiIOO COOSERVATIOO AIJI'HORITY BASIS <F APOORTIOtIimT - HlINICIPAL LEVY BASED ON 'l1tE LATEST EXlUALIZED ASSESSiEm' FIWRES (DISCOONTID) AVAILABLE TO THE AU'DIORITY** Discounted \ of Discounted FlpJalized Population FlpJali zed I".m icipali ty Assessment Total In tt.micipalitv Assessment In l\uthoritv In Watershed Pooolation l\uthoritv 1,000's of $'s 1,000's of $'s Adjala Township 64,667 8 5,173 3,899 312 Durham, Regional Hmiclpality of 1,277,001 * 1,002,050 75,909 61,103 Metropolitan Toronto 48,114,479 . 100 48,114,479 2,140,347 2,140,347 K>no Township 91,590 5 4,580 4,126 206 Peel, Regional MUnicipality of 11,639,388 * 4,923,577 506,421 219,462 York, Regional MUnicipality of 6.026,858 * 5,286,715 202.536 170.214 67,213,983 59,336,574 2.933.238 2,591,644 ANl\LYSIS <F IUXiIONAL HllUCIPALITIES * Durham, Regional Hmicipality of Ajax Town 422,170 86 363,067 25,660 22,068 Pickering Town 627,060 95 595,707 38,799 36,859 Uxbridge Town 227.771 19 43,276 11.450 2,176 1. 277 001 1,002,050 75,909 61,103 Peel, Regional ttmicipality of Brampton, City of 3,144,226 63 1,980,863 154,981 97,638 Hississauga, City of 7,861,929 33 2,594,436 324,853 107,201 Ca1edon Town 633 233 55 348,278 26,587 14 , 623 11,639,388 4,923,577 506,421 219,462 York, Regional Hmiclpality of l\urora Town 329,525 4 13,181 16,466 659 Markhan Town 2,403,017 100 2,403,017 81,932 81,932 Richnond lUll Town 931,483 99 922,168 38,488 38,103 Vaughan Town 1,621,307 100 1,621,307 36,815 36,815 Whitchurch-Stouffvil1e Town 332,271 43 142,877 13,551 5,827 King Township 409,255 45 184,165 15.284 6,878 6,026,858 5,286,715 202.536 170, 214 ** As provided by the Hinistry of Hmiclpal Affairs arxl Ilousing. 83.02.10 . Page 11-2 'l1IE HETROOOLITAN TOR<Nl'O AND IUXiION CONSERVATION AU'l1IORITY 1982 LEVY A~RTIOIt1mr WING DISCOUNTED fX)UALIZED ASSE:>Simr* General and Capital Levy Waterfront Project excluding Waterfront Discounted Assessnent Discounted Assessment Proportionate 95\ HetrojOurham Proportionate in Watershed Factor 5\ IIdja1a!Hono/Peel/york Factor (l,ooO's of $'s) (l,OOO's of $'s) . Adjala 5,173 .00008718064 5,173 .00002530811 Durham Ajax 363,067 Pickering 595,707 Uxbridge 43,276 1,002,050 1,002,050 .01688756078 1,002,050 .01938140825 Metro 48,114,479 .81087389710 48,114,479 .93061859175 Mono 4,580 .00007718679 4,580 .00002240695 Peel Brampton 1,980,863 Hississauga 2,594,436 Caledon 348,278 4,923,577 4,923,577 .08297710279 4,923,577 .02408784403 York l\1uora 13, 181 Markham 2,403,017 Richoorxl IJill 922,168 Vaughan 1,621,307 Whitchurch-Stouffvi1le 142,877 King 184,165 5,286,715 5,286,715 .08909707190 5,286,715 .02586444091 59,336,574 1.00000000000 59,336,574 1.00000000000 * As provided by the Hinistry of ttmicipal Affairs and Ilousing. 83.01.31 Page 11-3 TIlE HETROroLITAN TORONTO AND IUXiIOO CONSERVATION AIJI'lIORITY APOORTI<H1ENI' <F 1983 LEVIES G:NERAL PROJECTS - WATERSHED PLAN PROJECTS - WATERFR<HI' . 1 9 8 3 GENERAL LEVY WATERSHED PROJECTS SPECIAL WATERFRONT Before Tax Total Inc. 1982 General Inc Capi tal Capi tal Highland Visitors' Guild Developnent Shoreline Tax Adjll5t Adjll5bnent Tax Adjll5t Tax Adjll5bnent All Ben. Ben .ttm. Total Creek Centre Inn etc. Ha'1anent $ $ $ $ $ $ $ $ $ ~ $ IIdjala 348 348 375 21 21 28 Durham 67,403 41,465 108,868 106,512 4,180 2,250 6,430 11,462 21,174 , Metro Toronto 3,236,427 3,236,427 3,143,693 200,691 173,250 373,941 67,500 250,000 1,016,701 262,125 .K>no 308 308 328 19 19 24 Peel 331,185 98,751 429,936 418,957 20,537 13,500 34,037 26,316 York 355,612 28,074 383,686 338,746 22,052 9,000 31,052 28,257 247,500 198,000 445,500 3,991,283 168 290 4.159,573 4.008.6ll (247,500) (247.500) 67,500 11,462 250,000 1.092.500 262,125 NO'fES TO LEVY SHEET 1. a) $247,500 of 1982 capital surplus has been credited to the 1983 Watershed Projects, capital all benefiting municipalities. b) The IJighland Creek project has been included with Metro, the benefiting municipality, for an estimated net expenditure in 1983 of $67,500. c) The Guild Inn takeover is estimated to cost Metro, the benefiting mlIlicipality, approximately $250,000 in 1983. 2. 25th Year Project, Black Creek pioneer Village Visitors centre: 'lhis project is to be financed as follows: Hanber Municipalities' Special Contribution $ 588,538 Regional Municipality of Durham 11,462 Wintario 600,000 Metro Toronto and Region Conservation Foundation 600,000 $1,800,000 =======::::z= 83.01.31 Page 111-1 LECEND: CUrrent Items - II Capital Items - 00 BUDGET SlHtARY 1983 BlDGE'f SOURCES (F FINAtCING 1982 BlDGET 1982 AC'I'UAIB ACTIVITY NET PROVItCIAL MUNICIPAL EXPEtI>ITURES REVENUES EXPEWITURES GRANT LEVY O'DJER EXPEWITURES REVENUES EXPENDITURES REVENUES $ $ $ $ $ $ $ .~. $ $ FINl\tCE & AL't1INISTRATION Administration .. 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429 General Expenses .. 265,000 172,000 93,000 18,000 75,000 217,500 160,000 346,680 224,443 Property Acquisition - Haintenance Management Flood control 152,500P Land Acquisition 00 550,000 550,000 150,000 247,500 500,000 604,913 Waterfront llazard Land Acquisition 00 325,000 325,000 146,250 178, 750P 325,000 332,204 I Waterfront Open Space Land Acqu 'n 00 300,000 300,000 150,000 150,000P 707,500 678,034 Legal Costs 11 , 000 Regulation Enforcement .. 11,000 6,050 4,950 15,000 8,476 Water & Related Taxes .. 260,245 260,245 143,135 117,110 234,000 194,350 Insurance .. 14,300 14 , 300 7,865 6,435 12,800 9,150 Conservation & Recreation TaxeS .. 67, 200 6'7, 200 33,600 33,600 60,000 48,690 Insurance .. 13,720 13,720 6,860 6,860 12,200 9,154 Vehicle & Equipment Purchases .. 280,730 280,730 13,600 267,130 242,025 208,488 P -Provincial cash flow to be requested. 83.02.17 Page 111-2 BlDGET S{HtARY 1983 BUDGET SOURCES <F FINl\tCING 1982 BlDGET 1982 AC'I'UALS l\CTIVITY NET PROVIOCIAL KJNICIPAL EXPEmITURES REVENUES EXPENDITURES GWfI' LEVY OTHER EXPENDITURES REVEtIJES EXPENDITURES REVENUF..8 ~ ~ Ii Ii ~ Ii ~ Ii Ii Ii WATER RESOURCES - FLOOD CONl'ROL Program Administration .. 743,652 743,652 394,850 337,681 11,121 680,640 690,282 Erosion - MetI"O 00 396,500 11,500 385,000 179,575 173,250 32,175P 415,000 15,000 409,741 5,781 Erosion - Peel 00 35,600 5,600 30,000 10,000 13,500 6,SOOP 32,000 2,000 30,209 Erosion - York 00 23,500 3,500 20,000 4,950 9,000 6,05OP 21,500 1,500 22,753 4,200 EI"osion - Durham 00 5,000 5,000 2,250 2, 750P 5,300 300 4,892 Flood Control - Planning .. 58,500 58, 500 11,000 26,325 21,175P 171,680 163,630 Ranedia1 Works 00 1,285,000 1,285,000 530,100 67,500 82,500P 725,000 737,320 604,900 Flood Control - Maintenance SnaU Dams aM . Channels II 244,000 244,000 134,200 109,800 155,000 156,027 Flood Control - River FOrecasting .. 119,637 119,637 65,800 53,837 121,000 115,629 . WA'l'ER RESOURCES - WATERFRONT Adninistration 00 211,239 2ll,239 105,620 105,619 253,786 256,949 Lake Ontario Haterfront 00 1,531,261 150,000 1,381,261 632,000 690,631 58, 630P 1,090,671 1,114,029 Shoreline Hanaganent 00 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600 alNSERVATION LAND Hr\NAC>>tENl' Program Administration .. 673,204 673,204 336,~2 336,602 644,300 656,675 P - provincial cash flow to be requested. 83.02.17 Page 111-3 BWGET SlIflARY 1983 BlDGET SOURCES <F FINAOCING 1982 BlDGET 1982 AC'lUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES rnANT LEVY O'l1IER EXPENDITURES REVENUES EXPEmITURES REVENUES ~ $ ~ $ ~ ~ ~ ~ 1J ~ Watershed Recreation Planning II 75,000 75,000 37,500 37,500 120,000 76,457 Developnent .. 181,960 181,960 80,000 85,490 16,470 627,000 148,928 Operations II 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218,076 999,040 Conservation Land Managanent II 469,181 134,000 335,181 166,775 168,406 329,000 44,000 398,374 108,103 INFORMATION & IDnTION Program lIdministration " 315,420 315,420 157,710 157,710 268,385 253,672 CarrolIli ty Relations Inform Support " 64,842 64,842 32,421 32,421 59,990 65,528 General " 80,127 80, 127 43,170 36,957 74,100 63,830 Resource M]t. Programs " 11,000 11,000 6,050 4,950 10,000 9,894 Planning/Market Analysis" 90,243 90,243 90,243 125,000 124,260 CarrolIlity Relations Etlocn. Support " 35, 108 35,108 11,554 17,554 32,111 33,312 Supervision Operation & Haintenance " 1,273,083 1,136,300 136,783 58,780 78,003 1,037,764 873,800 1,223,822 1,067,965 Supervision Operation & Maintenance - Kortright " 442,000 264,850 177,150 19,140 120,460 37,550 393,000 232,150 400,531 219,918 I Developnent " 114,800 114,800 9,600 105,200 180,500 36,077 83.02.17 Page 111-4 BlDGET SlHiARY 1983 BlDGET SOURCES <F FlHAOCING 1982 BWGET 1982 AC'lUALS ACTIVITY NET PROVIOCIAL KJN IC I PAL EXPENDI'roRES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDI'roRES REVENUES EXPEtmI'roRES REVEWES Ii Ii $ $ $ ~ Ii Ii Ii (I IUSTORICAL SITES Progr~n Administration .. 273,122 273,122 94,843 178,279 248,700 260,599 Operations " Haintenance .. 1,487,200 1,025,000 462,200 260,200 202,000 1,492,000 1,040,500 1,458,808 925,016 Edocational Programs .. 157,500 163, 500 (6,000) (6,000) 174,450 179,700 127,035 147,697 capital Developnent 00 1,995,000 1,995,000 1,995,000 1,930,000 89,902 CURRENT 11,350,774 3,911,650 7,439,124 2,543,905 4,159,573 735,646 11,255,411 3,530,150 10,854,863 3,692,182 CAPITAL 7,240,600 170,600 7,070,000 1,882,245 1,620,125 3,567,630 6,428,800 18,800 4,691,546 9,981 1983 TOTAL 18,591,374 4,082,250 14,509,124 4,426,150 5,779,698 4,303,276 17,684,211 3,548,950 15,546,409 3,702,163 1982 TOTAL 17,684,211 3,548,950 14,135,261 4,854,435 5,471,611 3,809,215 -I-. 83.02 17 . Page ~-l:. 1983 BUDGET ESTIMATES TilE FINANCE AND ADMINISTRATION DIVlSI~ To support goalS of the Authority. the re.poeeibiiiti.e of U,' oi.ieioe encompae. finenciai management and monitoring of financial procedures. compilation of budget, multi-year forecast and pro.ieion of such financiai data and report in. 00 required. The oi.iaion ia reepon.ible fnr acquieitiona and ..na.e.ent of property. ..ne.e..nt of Authority legal services. ..na.e..nt of Aethority'e ad.inietration officee an' .roun'.' and provision of ...iniatrati.e .er.ice. to all .i.ieion. of the Auu~rity an' ..na.e.ent of Authority per.onnei services. The secretary-TreaSurer is required to record the resolutions. decisions and other proceedings of the Authority an' to keep the ori.in,'a of ,11 .inutea of the Autbority an' ite bOar'. and committees 82 09.22 . Pa~V-2 1982 ACIII EVEMENTS . the Accounting Section continued the development and implementation of a computer-based financial management and budget reporting system a Personnel Officer was employed, reporting directly to the General Manager the updating of the Authority's Personnel Policies Manual was completed 1983 PRIORITIES In general, the objectives for 1983 relate to further improvement in performance for services presently provided, and provision of new and expanded services within the available resources In particular, the Accounting Section will continue to develop and improve financial reporting procedures, including revision of purchasing policy to conform to computer accounting. . 82 09 22 Page IV-3 1983 BlDGET ESTIMATES DIVISION Finance , hdminist~ation 1983 BmGET OOURCES (F FINAtCING 1982 BtIXE'I' 1982 AC'lUALS l'R00Wi NET PROVIOCIAL HllN IC I PAL EXPENDI~ REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEWES EXPENDITURES REVmlIES $ $ $ $ $ $ $ $ $ $ Program Administration 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429 General Expenses 265,000 172,000 93,000 - 18,000 75,000 217,500 160,000 346,680 224,443 property Acquis tion - Haintenance , Managanent 1,541,465 1,541,465 347,510 465,205 481,250P 1,866,500 1,884,971 247,500 Vehicle , Equipoont Purchases 280,730 280,730 13,600 267,130 242,025 208,488 T<YrAL 3,467,195 172.000 3,295.195 1. 037 .510 1.186.805 1.070.880 3.639,585 160.000 3.788.568 224.443 P - provincial cash flow to be requested. 83.02.17 . Page IV-4 1983 BUDGET ESTIHATES DIVISION: Finance and Administration PROGRAH: Admin istrat ion PURPOSE: To provide the administrative and financial services of the Authority. 1983 OBJECTIVES: - Continuation of general administration and financial support services for all Authority programs, as well as salaries and expenses for the Chairman and Vice Chairman. The salaries of the General Hanager, Deputy General Hanager, Secretary-Treasurer, associated secretarial staff, and the staff of the Finance and Administration Division, which includes Land Acquisition, Personnel, Finance and general office administration, are charged to this program. The payment of members' per diem and kilometers and the Authority meeting expenses are included in the budget. The cleaning and maintenance of the administration headquarters is also funded. FUNDING: This is a shared program, financed by a grant from the Province of Ontario and the general levy on all participating municipal i ties. FINANCIAL COMHENTS: In 1983, as in 1982, employee benefits and Administrators' salaries are charged to each program. Salary increases are provided for on the basis of 5\ economic. OBJECTIVE CLASSIFICATIONS: Hembers Supplies (, Fringe Salaries Transportation (, Equipment Salaries Benefi ts (, Expenses Communication Services (Office) TOTAL 651,175 96,505 94,170 148,600 319,550 70,000 1,380,000 83.02 17 Page IV-S 1983 BIDGE'l' ESTIMATES DIVISION: Finance and Administration Program: lIdministration 1983 BI.IX3ET SOURCES <F FINAtCING 1982 BUOOBT 1982 ACTUALS ACTIVITY NET PROVItCIAL K1NICIPAL EXPENDITURES RE\IEIlJES EXPENDITURES rnANT LEVY OTIfER EXPEWI'IURES REVEWES EXPENDITURES REVENUES Salaries 651,175 651,175 325,588 325,587 655,772 658,389 FriBJe Benefits' Separation 96,505 96,505 48,252 48,253 114,323 86,595 Members' Salaries , Expenses 94, 170 94, 170 47,085 47,085 89,325 94,358 Transportation , CQIIlIl.ll icat i on 148,600 148,600 74,300 74,300 155,000 126,903 Services 318,550 318,550 159,275 159,275 218,140 293,387 Supplies (Office) 60,000 60,000 30,000 30,000 62,000 61,469 Equipmt. (Office) 10,000 10,000 5,000 5,000 8,000 22,136 safety Comn Uee 1,000 1,000 500 500 1,000 681 Biennial Conference . 10,000 4,505 TOTAL 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429 83 02.17 . Page IV-6 1983 BUDGET ESTIMATES DIVISIONI Finance and Administration PROGRAM I General Expenses PURPOSE I To provide for a variety of support costs for which no Provincial Grant is available 1983 OBJECTIVES I - To fund the maintenance of revenue producing properties and other general maintenance _ To fund the public liability insurance on vehicles and equipment. _ To fund the Authority's share of vehicles and equipment. - To fund taxes and insurance for revenue producing properties FUNDING I Since no provision for these items is made in the Ministry of Natural Resources grant structure, the funding is entirely from municipal levy and program revenues consisting of rental income It should be noted that no provision has been made for the contingency of a deficit in 1982 FINANCIAL COMMENTSI OBJECTIVE CLASSIFICATIONS I Haterials Salaries Supplies " Services Interest " Wages Utilities " Rents Costs Insurance Taxes TOTAL $ 10,000 24 , 000 73 , 000 30,000 23,000 105,000 265,000 82 00 09 Page IV-1 1983 BlIlGET ESTIMATES DIVISION: Finance aM Administration Program: General Expenses 1983 BUDGET SOURCES (J? FINAOCING 1982 BUDGET 1982 AC'roALS ACTIVITY NET PROVIOCIAL KJNIC I PAL EXPENDI'nJRES REVEmES EXPENDITURES GRANT LEVY O'I1fER EXPENDITURES REVENUES EXPENDITURES REVENUES ~ $ ~ $ ~ $ ~ $ $ $ Authority' Staff Meetings aM E\1nctions 30,000 30,000 30,000 26,500 47,648 Vehicles , Equipt Expenses 5,000 5,000 5,000 5,000 5,000 Staff' Authority Members Long Service' Retlranent 6,000 6,000 6,000 6,000 1,906 Insurance 16,000 16,000 16,000 14,000 11,106 Interest 30,000 30,000 (45,000) 75,000 96,716 Miscellaneous 6,000 6,000 6,000 6,000 9,082 Rental Properties Maintenance 60,000 60,000 60,000 76,400 Realty Taxes 105,000 105,000 94,000 94,836 Insurance 7,000 7,000 6,000 3,986 Rental Incane 172,000 (172,000) 160,000 224,443 TOTAL 265.000 172.000 93.000 18.000 75.000 217.500 160,000 346,680 224.443 83.02 09 . Page IV-8 1983 BUDGET ESTIHATES DIVISION: Finance and Administration Revenue Detail: General Expenses 1983 BUDGET 1982 BUDGET &H. & I ACTIVITY REVENUE ACTIVITY REVENUES 1982 ACTUALS $ Rental Income on Authority- owned Real Property 172,000 160,000 224,443 172 . 000 160,000 224,443 83.02.09 Page IV-9 1983 BUDGET ESTIMATES DIVISION: Finance and Administration PROGRAM: Property Acquisition, Haintenance and Hanagement PURPOSE: . To provide for the funding required for carrying out the purchase of lands under the Interim Water and Land Hanagement Project and under the Waterfront Project. . To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands under Water and Related Land Hanagement Programs. . To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands and facilities under Conservation and Recreation Land Hanagement Programs. . To provide for legal costs associated with the Authority's regulation enforcement. 1983 OBJECTIVES: - To aC1uire lands for the Flood Control Program and Lake Ontario Waterfront Open Space land. - Admin stration of taxes and insurance for both Water and Related and Conservation and Recreation. - provision for regulation enforcement. FUNDING: The funding for this program is on a shared basis with 55\ and 50\ of the funds being available from the Province of Ontario and the balance being funded by general levy on all participating municipalities. FINANCIAL COHHENTS: The funding for realty taxes does not make allowances for any market value assessment that may be implemented in 1983. OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL $ 1,175,000 39,020 327,445 1,541,465 83.02.17 Page IV-I0 1983 BWGET ESTIMATES DIVISION: Finance and Administration Pt:ogram: Property Acquisition, Maintenance & Managanent 1983 BlJDGET SOURCES CF FINl\tCING 1982 BWGET * 1982 AC'lUALS ACTIVITY NET PROVItCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEWEB EXPENDITURES REVENUES ~ ~ ~ ~ ~ ~ ~ ~ 1J ~ Flood Control Land AcquiSItion 550,000 550,000 150,000 152,500P 500,000 604,913 247,500 \'laterfront llazard Land Acquisition 325,000 325,000 146,250 178,750P 325,000 332,204 . Waterfront Open Space Land Acquisition 300,000 300,000 150,000 150,000P 707,500 678,034 Legal Costs Regulation Enforcanent 11,000 11,000 6,050 4,950 15,000 8,476 . Water & Related Taxes 260,245 260,245 143,135 117,110 234,000 194,350 Insurance 14,300 14 , 300 7,865 6,435 12,800 9,150 Conservation & Recreation Taxes 67, 200 67,200 33,600 33,600 60,000 48,690 Insurance 13,720 13,720 6,860 6,860 12,200 9,154 TOTAL 1,541,465 1,541. 465 347,510 465,205 728,750 1. 866,500 1,884,971 * as amended P - Provincial cash flow to be requested 83 02.17 , Page IV-ll 1983 BUDGET ESTIHATES DIVISION: Finance and Administration PROGRAH: Vehicle , Equipment Purchases - New and Replacement PURPOSE: To sustain the Authority's vehicles and equipment, and food services equipment complement at adequate levels to assure economy, efficiency and productivity in various programs. 1983 OBJECTIVES: - To purchase the following equipment: Division Vehicle Replacement New Equipment Replacement Equipment Water Resource 25,000 3,000 Conservation Land Hanagement 27,000 13,600 143,650 Information , Education 15,000 3,480 67,000 13,600 150,130 FUNDING: Replacement vehicles and equipment are funded via recoveries (based on use) from operating divisions and includes provincial grant and municipal levies as applicable through the Vehicle and Equipment Fund. New equipment and vehicles are funded from municipal levy. FINANCIAL COHHENTS: No recovery is available from the Hinistry of Natural Resources for Food Service Equipment. It is necesary to derive funds for Food Service Equipment from the Authority's Operating Fund. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies , Vehicles , Real Services Financial , Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL $ 280,730 280,730 83.02.09 Page IV-12 1983 BUDGET wrIHATES DIVISION: Finance and AdwJnistration Program: Vehicle , Equipnent Pw:chases - New , Replacenent 1983 BlIX>ET OOURCES <F FINl\OCIOO 1982 BlD.>ET 1982 ACTUAIlJ ACTIVITY NET PROVIOCIAL HlmICIPAL EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVmUES EXPENDITURES REVENUES ~ T $ $ V $ $ $ $ $ Vehicles - New - - Replacanent 67,000 67,000 67,000 79,000 81,654 Equipnent - New 13,600 13,600 13,600 9,100 2,706 - Replacenent 150, 130 150,130 150,130 118,190 123,079 Food Services Equipnent 50,000 50,000 50,000 35,735 1,049 TOTAL 280.730 280,730 13.600 267.130 242.025 208,488 83.02.09 Page IV-13 1983 BUDGET ESTIMATES DIVISION: Finance and Administration PROGRAH: Food Services PURPOSE: To provide food services at the refreshment stands, Half Way House, Kortright Centre for Conservation and the Conservation Field Centres. 1983 OBJECTIVES: - To provide a high quality food service that is attractive to all visitors; - To maximize net revenue from the food operation. I FUNDING: This program is funded from revenues. FINANCIAL COMMENTS: The net revenues will be used to offset operating and maintenance costs in the areas where the revenues are produced. OBJECTIVE CLASSIFICATIONS: Salaries Haterials Wages & Supplies & Cost Services Financial Benefi ts Utilities Equipment of Sales & Rents Taxes Expenses TOTAL 1; 401,530 129,981 226,354 75,452 833,317 83.02.10 Page IV-14 1983 BUDGET ESTIMATES DIVISION: Finance and Administration Program: Food Serv ices ** 1983 BUDGET SOURCES <F FINAtCING 1982 BtJOOET 1982 AC'lUALS ACTIVITY NET PROVItCIAL KlNICIPAL EXPENDI'l\IRES REVENUES EXPENDI'l\IRES GRANl' LEVY 0'l1IER EXPENDITURES REVENUES EXPENDI'l\IRES REVENUES Program , Administration 156,150* Conservation Land Managanent - Refreshnent StaMs , Group Catering 165,900 187,000 (21,100) Information' Education - Conservation Field Centres 259,417 259,417 Kortright Centre 46,000 56,000 (10,000) 305,417 315,417 (10,000) Historical Sites- IIalf\<.aY Ibuse 259,000 290,000 (31,000) Refreshnent StaM 103,000 ll3,000 (10,000) 362,000 403,000 (41 ,000) 'I'O'fAL 833,317 905,417 (72,100) * Amount included in divisional budgets above aM is shown separately only for infoonation purposes. ** Net expenditures have been incoporated into divisional operating budgets. The above summary is shown separately as additional infoonation. Al n... In Page V-I 1983 BUDGET ESTIMATES THE WATER RESOURCE DIVISION This Division is responsible for the carrying out of the approved water management policies and programs of the Authority, as they apply to the river systems and the Lake Ontario Waterfront, including' - administration of the Flood Control Program, - administration of the Waterfront Development and Shoreline Management Program, - administration of the Storm Water Management Program, - the development and operation of the Flood Warning System, - technical advice and direction concerning the enforcement of the Authority's fill regulations and development control, . - environmental monitoring and review of flood control and waterfront projects, - the administration of the Authority's Erosion and Sediment Control Program, - the co-ordination of site plans and development with municipalities and Province of Ontario. 82 09 27 . Page V-2 1982 ACIIIEvmENTS Provided adequate funding for staff to achieve program objectives. flood control works. Completed final engineering and first phase of construction for Bol ton Completed flood control channel at Oak Ridges Completed studies of Palgrave Dam and Goodwood Pumping Station. . Operated and maintained existing flood control structures, carried out maintenance on Hassey Creek channel. Operated and continued improvements to the Flood Warning and Flood Forecasting System. Updated hydrological studies and flood plain mapping. . Provided protection from erosion and slope instability at priority sites in Metropolitan Toronto, Peel, York and "Durham, Commenced Highland Creek remedial erosion control works. . Completed Environmentally Significant Areas study and circulated to member municipalities and interested agencies. Completed Environmental Assessment report for Keating Channel remedial measures Reviewed and commented on development proposals, administered Fill, Construction and Alteration to Waterways regulations Reviewed and commented on Storm Water Management proposals and reports. Completed Humber Bay West Phase II, substantially completed Bluffers Phase II Continued development at Marie Curtis Park - 1983 PRIORITIES . Flood Control to provide for administration of the Flood Control Program . to complete remedial flood control measures at Bolton to operate and maintain the Flood Warning and Flood Forecasting System to maintain Flood Control dams to maintain Flood Control channels and structures to maintain other water control structures. Erosion Control . to carry out remedial measures in Metropolitan Toronto on a priority basis . to complete Phase I, Highland Creek remedial measures . to carry out remedial measures in Peel, York and Durham on a priority basis to commence Phase II, Highland Creek remedial measures Shoreline Management remedial measures on Lake Ontario Shoreline on a priority basis. to carry out Environmental and Other Studies to undertake pre-engineering studies to commence preparation of Master Drainage Plans . to update and continue various Watershed studies Lake Ontario Waterfront Development . to provide for administration of Lake Ontario Waterfront programs . to commence work at Samuel Bois Smith Waterfront Area to provide internal access and servicing at East Point to complete servicing and site stabilization at Bluffers Park to complete initial development (road access, parking) at Bluffers Toplands . to continue Environmental Monitoring Program to provide predevelopment maintenance 82 09.27 Page V-3 1983 BUDGET ESTIMATES DIVISION Water Resource SEX::TION Flood Control 1983 BUDGET SOURCES <F FINAN:ING 1982 BUDGET 1982 ACTUALS PROGRAM NET PROVIN:IAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY O'I1IER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ $ ~ ~ ~ $ $ $ $ Program Administration 743,652 743,652 394,850 337,681 11,121 680,640 690,282 Erosion ~tro 396,500 11, 500 385,000 179,575 173,250 32,175P 415,000 15,000 409,741 5,781 Erosion Peel 35,600 5,600 30,000 10;000 13 , 500 6, SOOP 32,000 2,000 30,209 Erosion York 23,500 3,500 20,000 4,950 9,000 6,050P 21,500 1,500 22,753 4,200 Erosion Durham 5,000 5,000 2,250 2,750P 5,300 300 4,892 .. Flood Control Planning & Ranedia1 ~rks 1,343,500 1,343,500 541 , 100 93,825 604,900 896,680 900,950 103,675P Flood Control Maintenance/ anal1 OcI11s & Channels 244,000 244,000 134,200 109,800 155,000 156,027 Flood Control River 65'8~ I I I I 115'~1 Forecasting 119,637 119,637 53,837 121,000 J rorAL I 2,911,389 I 20,600 I 2,890,789 l 1,330,475 793,143 767,171 2,327,120 18,800 2,330,483 I 9,981 I P - Provincial cash flow to be requested. 83 02 17 . Page V-4 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: ' Flood Control PROGRAH: Program Administration PURPOSE: T,o provide administrative, planning, biological and engineering staff necessary for implementing 1983 programs. 1983 OBJECTIVES: Complete the 1983 phases of the Water Resource Division programs of flood control, development control and environmental planning and monitoring within the funding limits. , FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries SUfPlies " Real Services , Wages Ut lities Equipment Property , Rents TOTAL $ 665,352 15,200 63,100 743,652 83.02.17 , . Page V-5 1983 BUDGET ESTIMATES DIVISION: Water Re~urce SECl'ION : Flood Control Program: Progran Administration 1983 BWGET SOURCES <F FINAtCIOO 1982 BWGRT 1982 AC'IUALS AC1'IVITY NET PROVUCIAL K1NIC I PAL EXPENDITURES REVEWES EXPENDITURES GU\NT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ~ ~ ~ ~ ~ T ~ ~ ~ ~ Salaries 553,815 553,815 292,365 250,329 11,121 522,370 535,598 Benefits 111,537 111,537 61,345 SO, 192 110,405 101,227 Travel 14,000 14,000 7,700 6,300 14,165 14,032 Enforcanent Officer Travel 17,600 17,600 9,680 7,920 14, 600 17,923 Technical Haps Legal 9,000 9,000 4,950 4,050 15,000 10,308 Data Processing 5,500 5,500 3,025 2,475 3,685 Flood Control Workshop 3,500 3,500 3,500 3,500 7,509 Regulations - Fill' Construction 28,700 28,700 15,785 12,915 TOTAL 743,652 743,652 394,850 337,681 11,121 680,640 690,282 83.02.17 Page V-6 1983 BUDGET ESTIMATES DIVISIONl Water Resource SECTIONl Flood Control . PROGRAMl Erosion Control - Metropolitan Toronto PURPOSE I To minimize the hazards of erosion to life and property within Metropolitan Toronto. 1983 OBJECTIVES I - To carry out remedial protection works in vulnerable valley areas on a priority basis. - To continue to update and augment the current erosion inventory files and priorities FUNDING I This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the benefiting municipality, being the Municipality of Metropolitan Toronto FINANCIAL COMHENTSl Total cost includes expected revenues of $11,500 OBJECTIVE CLASSIFICATIONS I Materials Salaries Supplies & Survey & Services & Wages Utilities Equipment Legal & Rents TOTAL $ 77 , 900 130,000 800 10,000 177, 800 396,500 82 08 10 . Page V-7 1983 BUDGET ESTIMATES DIVISION: Water Resource SEX::TIOO: Flood Control Program: "Erosion Control - Metro 1983 BWGE'I' SOURCES <F FINl\tCING 1982 BWGET 1982 AC'IUALS ACTIVITY NET PROVItCIAL KJNIC I PAL EXPENDITURES REVEWES EXPENDITURES GRANT LEVY 0'I11ER EXPENDITURES REVElm:S EXPENDITURES REVENUES ~ q ~ T ~. (J (J $ ~ ~ Administration 43,000 43,000 23,650 19,350 38,000 34,376 Ranedial ibrks 353,500 11,500 342,000 155,925 153,900 32,175P 377 ,000 15,000 375,365 5,781 TOTAL 396.500 11.500 385.000 179.575 173.250 32, 175P 415.000 15,000 409.741 5,781 P - provincial cash flow to be requested. 83.02.17 . Page V-A 1983 BUDGET ESTIMATES DIVISIONI Water Resource SECTION I Flood Control PROGRAM I Erosion Control - Peel PURPOSEI To minimize the hazards of erosion to life and property within the Regional Municipality of Peel. 1983 OBJECTIVES I - To carry out remedial protection works in vulnerable valley areas on a priority basis - To continue to update and augment the current erosion inventory files and priorities FUNDING I This a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the benefiting municipality, being the Regional Municipality of Peel FINANCIAL COMMENTSI Total cost includes expected revenues of $5,600 OBJECTIVE CLASSIFICATIONS I Materials Salaries Supplies & Real Services Survey & & Wages Utilities Equipment Property & Rents Legal TOTAL $ 3,000 12,300 16,800 3,500 35,600 82 08 10 Page V-9 1983 BUDGET ESTIMATES DIVISION: Water Resource SB::TIOO : Flood Conttro1 Program: Erosion Control - Peel 1983 BUDGET SOURCES (F FINl\tCING 1982 Bf.IJG8T 1982 AC'IUAlS ACTIVITY NET PROVI~IAL KJNICIPAl'.. EXPENDITURES REVEtIJES EXPENDI'nJRES GtANT LEVY 0'I1IER EXPENDITURES RI.'VEWES EXPEflJITURES REVENUES ~ ~ ~ ~ f$ If !i ~ ti ~ Mninistration 4,000 4,000 2,200 1,800 2,500 2,418 Ranedia1 Works 31,600 5,600 26,000 7, 800 11, 700 6,500P 29,500 2,000 27,791 . 'lQI'AL 35,600 5,600 30,000 10,000 13.500 6.500P 32,000 2,000 30,209 P - Provincial cash flow to be requested. 83.02.17 . , , Page V-lO 19B3 BUDGET ESTIMATES . DIVISION: Water Resource SECTION: Flood Control PROGRAM: Erosion Control - York PURPOSE: To minimize the hazards of erosion to life and property within the Regional Hunicipality of York. 19B3 OBJECTIVES: - To carry out remedial protection works in vulnerable valley areas on a priority basis. - To continue to update and augment the current erosion inventory files and priorities. FUNDING: This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the benefiting municipality, being the Regional Municipality of York FINANCIAL COMMENTS: Total cost includes expected revenues of $3,000 OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Survey & & Wages Uti li ties Equipment Property & Rents Legal TOTAL $ 3,500 8,000 10,500 1,500 23,500 82 08 10 Page V-ll 1983 BlIXiET ESTIMATES DIVISION: Water Resource SD:TION: Flood Control Program: Erosion Control - York 1983 BI.IDGE'l' SOURCES (F FItIMCIOO 1982 BIDGE'I' 1982 AC'fUA[S lICTIVI TY NET ~OVnCIAL KJNIC I PAL EXPENDITURES REVENJES EXPENDITURES GRANT LEVY OTHER EXPENDI'l'URES REVENUES EXPEmITURES REVEMJES ~ ~ ~ ~ I,; I,; ~ ~ ~ I? lIdministration 2,000 2,000 1,100 900 2,000 3,403 Ranedial ~rks 21,500 3,500 18,000 3,850 8,100 6,050P 19,500 1,500 19,350 4,200 TOTAL 23,500 ~~500 20,000 4,950 9,000 6,050P 21,500 1,500 22,753 4,200 P - provincial cash flow to be requested 83.02.17 , . Page V-12 1983 BUDGET ESTIMATES DIVISIONr Water Resource SECTIONr Flood Control PROGRAMr Erosion Control - Durham . PURPOSEr To minimize the hazards of erosion to life and property within the Regional Municipality of Durham. 1983 OBJECTIVES, - To carry out remedial protection works in vulnerable valley areas on a priority basis - To continue to update and augment the current erosion inventory files and priorities. FUNDING, This is a shared program, 55\ of the funds being available from the Province of Ontario and the balance being funded from the benefiting municipality, being the Regional Municipality of Durham FINANCIAL COMMENTSr OBJECTIVE CLASSIFICATIONS, Materials Salaries Supplies & Real Services & Wages Utilities Equipment Property & Rents TOTAL $ 600 2,000 2,400 5,000 82 08 10 Page V-13 1983 BUDGET ESTIMATES DIVISION: Water Resource SECl'ION: Flood Control Program: Erosion COntrol - Durham 1983 BlIn:T SOURCES CE FINl\tCING 1982 BI.IXE'I' 1982 AC'lUAl.8 ACTIVITY NET PROVltCIAL K1NIC I PAL EXPENDIWRES REVIaJES EXPENDITURES GRANT LEVY 0'l11ER ExmmIroRES REVENUES EXPENDITURES REVENUES S f{ S Ii ti ti $ $ $ $ Administration 300 300 135 165P 500 612 Raoedial Works 4,700 4,700 2,115 2,585P 4,800 300 4,280 . rofAL 5.000 5,000 2,250 2, 750P 5,300 300 4.892 P - Provincial cash flow to be requested. 83.02.11 . Page V-14 1983 BUDGET ESTIHATES DIVISION: Water Resol1rce SECTION: Flood Control PROGRAH: Flood Control Planning and Remedial Measures PURPOSE: To undertake a comprehensive program of flood control designed to prevent, eliminate or reduce the risk of hazard to life and property, while cognizant of the natural attributes qf the valley system. 1983 OBJECTIVES: - To continue to carry out preliminary engineering on the Authority's damage centres. - To complete flood control remedial works on the Humber River at Bolton. - To assist municipalities in the preparation of Haster Drainage Plans for storm water management. - To continue erosion control measures on Highland Creek. FUNDING: This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities, with the exception of the Bolton remedial works where funding is to be provided 100\ by the Province of Ontario. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services & Wages Utilities Equipment Property & Rents TOTAL $ 5,500 55,000 1,283,000 1,343,500 83 02.10 Page V-IS 1983 BUDGET ESTIMATES DIVISION: Water Resource mcrIOO: Flood Control Program: Flood Control Planning and Raoedial Measures I 1983 EIUDGET OOURCES <F FINAtCIOO 1982 BllXET* 1982 AC'I'UALS AC'fIVI'1'Y NET PROVItCIAL K1NIC I PAL EXPENDITURES REVEtIJEB EXPENDITURES . GRANT LEVY O'l1IER EXPENDITURES REVENUES EXPEWI'IURES REVENUES $ $ ~ ~ ~ ~ $ $ $ $ Bolton RanaUal \'brks 1,135,000 1,135,000 530, 100 604,900 540,000 553,156 . preliminary Eng ineeri~ 25,000 25,000 11,250 13, 750P 54,300 76,388 Master Drainage Planning 20,000 20,000 11,000 9,000 20,000 4,568 Envlronnental Studies 13,500 13,500 6,075 7,425P 55,000 41,087 HighlaM Creek 150,000 150,000 67,500 82,500P 100,000 95,952 Keating Channel 50,000 43,230 Oak Ridges Channel - Ranedia1 \'brks 35,000 44,982 Flood Plain Mapping 42,380 41 , 587 TOTAL 1.343,500 1.343,500 541, 100 93.825 708,575 896,680 900.950 as ameMed P - provincial cash slow to be requested. 83.02.17 . Page V-16 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: Flood Control PROGRAH: Flood Control HaintenancejSmal1 Dams, Channels, Erosion Control Structures PURPOSE: Maintaining capital works already in place. 1983 OBJECTIVES: - To provide for regular maintenance of the water control structures at a level comparable with 1982. - To carry out major maintenance at Palgrave Dam and in the Lower Humber Channel. FUNDING This is a shared programI 55\ of the funds being available from the Province of Ontario and the balance being funded by the General Levy on all part cipating municipalities. FINANCIAL COHHENTS: Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major maintenance. OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies' Real Services , Wag es Utilities Equipment Property , Rents TOTAL $ 49,045 34,150 160,805 244,000 83.02.17 Page V-17 1983 BlIlGET ESTIMATES DIVISION: water Resource SECl'ION : Flood Control Program: Flood Control Maintenance/Small Dams, Channels, Erosion Control Structures 1983 BlIlGBT SOURCES <F FINAtCING 1982 BtIlGET 1982 ACTUALS ACTIVITY NET PROVItCIAL KJNICIPAL 8XPENDI'lURES REVEtIJES EXPENDITURES GRANT LEVY OTHER EXPEtIlI'lURES REVEHJES EXPEtI>ITURES REVENUF..B $ $ $ $ $ $ $ $ $ $ Small Dams 14,000 14,000 7,700 6,300 13,000 14,850 Major Maintenance 148,000 148,000 81,400 66,600 60,000 65,791 Erosion Channels 7,000 7,000 3,850 3,150 7,000 9, 146 Flood Control Olannels 75,000 75,000 41,250 33,750 75,000 66,240 TOTAL 244,000 244.000 134 . 200 109.800 155.000 156.027 83.02.17 . Page V-18 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: E"lood Control PROGRAH: Flood Control River Forecasting Operations/Haintenance Water Control Structures PURPOSE: To operate, maintain and improve the Authority's ability to provide the earliest possible warning of a flood threat and to operate its flood control structures. 1983 OBJECTIVES: - To continue regular operation and maintenance of the Flood Control Works and the Flood Warning and Flood Forecasting System at a level comparable with 1982. - To upgrade the data collection and analysis techniques required for advanced flood warning. FUNDING: This is a shared rrogram1 55' of the funds being available from the Province of Ontario and the balance being funded by the General Levy on a 1 part cipating municipalities. FINANCIAL COHHENTS: Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major maintenance. OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies , Real Services , Wages Utili ties Equipment Property , Rents TOTAL $ 55,798 23,750 6,080 34,009 119,637 83.02.,.. Page V-19 1983 BIJOOET ESTIMATES DIVISION: Water Resource SfI:TION: Flood Control Program: Flood Control River Forecasting Operations/Maintenance water Control Structures 1983 BlDGET SOURCES <F FINl\tCING 1982 BI.DGE'I' 1982 AC'I'UALS ACTIVITY NET PROVIK.:lAL tllNIC 1 PAL EXPEWITURES REVENUES EXPENDITURES GRANT LEVY 0'l11ER EXPEtI>ITURES REVENUES EXPENDITURES REVENUES $ (I $ $ $ ..~ $ ~ $ $ Claireville Dcm 38,324 38,324 21,078 17,246 35,750 37,441 G.Ross Lord Dam 33,437 33,437 18,390 15,047 30,550 32,221 Flood Warning 33,376 33,376 18,357 15,019 40,200 30,231 Flood Warning Systan D:}uipnt. K>delling 14 , 500 14 , 500 7,975 6,525 14,500 15,736 TO'fAL 119,637 119,637 65,800 53.837 121,000 115.629 83 02.17 . , Page V-20 1983 BlIX>ET ESTIMATES DIVISION: Water Resource SOCTION: Waterfront 1983 BWGE'l' SOURCES <F FINAtCING 1982 BWGE'l' * 1982 ACTUAlS PR<QWi NET PROVItCIAL HWIC I PAL EXPENDITURES REVEWES EXPENDITURES GRANT LEVY OTHER EXPmDITURES REVENUES EXPEmITURES REVENUES $ $ $ $ $ $ $ $ ~ $ Waterfront Mninistration 211,239 211,239 105,620 105,619 253,786 256,949 Shorel ine Hanaganent 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600 Lake Ontario Waterfront Developnent 1,531,261 150,000 1,381,261 632,000 690,631 58 , 630P 1,090,671 1,114,029 TOTAL 2.325,000 150,000 2,175.000 1,007,620 1, 058.375 109.005P 1,767.500 1. 781. 578 * as anerded p - Provincial cash flow to be requested. 83.02.17 . , Page V-21 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: Waterfront PROGRAM: Waterfront Administration PURPOSE: To pro~ide administrative, planning, biological and engineering staff necessary for implementing Waterfront projects. 1983 OBJECTIVES: - To proceed with design and construction of waterfront areas and shoreline management projects. - To proceed with planning and approval submissions for future waterfront and shoreline management works. FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. . FINANCIAL COHMENTS: Salaries and wages have been gapped by a factor of 1'. OBJECTIVE CLASSIFICATIONS: Ha teri a 1 s Salaries Supplies" Real Services & Wages Utili ties Equipment Property & Rents TOTAL $ 190,239 21 , 000 211,239 83.02.17 . Page V-22 1983 BlDGE'l' ESTIMATES DIVISION: Water Resource Sa:TION: Waterfront Program: Waterfront Mninistration 1983 BUXFr OOURCES (F FINAtcING 1982 BtDGE'l' 1982 AC'I'UMS ACTIVITY NET PROVItcIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES BXPENDITURES REVENUES Ii $ ~ :? (; ~ :? -$ ~ $ Salaries 132,075 132,075 66,038 66,037 185,669 196,552 Benefi ts 58, 164 58,164 29,082 29,082 56,017 54,706 Travel 9,000 9,000 4,500 4,500 12,100 5,691 Data ProcessiR] 5,000 5,000 2,500 2, 500 - Hi scellaneous 7,000 7,000 3,500 3,500 - TOTAL 2ll,239 211,239 105.620 105,619 253.786 256,949 83;02.17 Page V-23 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: Waterfront PROGRAM: Shoreline Hanagement . PURPOSE: To continue the program of shoreline management designed to prevent, eliminate or reduce the risk of hazard to life and property, while being cognizant of the natural attributes of the lake front setting. 1983 OBJECTIVES: - To construct protection of vulnerable shoreline areas on a priority basis. FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded by the Municipality of Hetropolitan Toronto as benefiting municipality. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real Services & Wag es Utilities Equipment Property & Rents TO TAr. $ 160,500 201,500 1,500 219,000 582,500 83.02.17 , . Page V-24 1983 BWGE'l' ESTI,HATES DIVISION: Water Resource SECrION: Waterfront Program: Shoreline Managanent 1983 BUOOET SOURCES (F FINAtCING 1982 BWGE'l' 1982 IIC'lUALS ACTIVITY NET PROVItCIAL 'UUCIPAL EXPENDITURES REVElIJES EXPEYlITURES GRANT LEVY 0'l11ER EXPENDITURES REVEWES EXPENDITURES REVENUES ~ Ii ~ ~ ~ ~ ~ 'I ~ ~ Lakehurst COUrt 282,500 282,500 140,000 127,125 15, 375P Design 15,000 15,000 6,750 8, 250P 100,000 96,948 Maintenance 15,000 15,000 6,750 8, 250P 50,000 49,117 South Harine Drive 260,000 260,000 130,000 117,000 13,OOOP 15,000 14,900 Bluff Drainage 10,000 10,000 4,500 5,500P 20,000 18,879 Crescentwood 50,000 45,981 Kingsbury 19,893 16,823 Guild Inn 18,000 18,224 Springbank Ave. 150,150 149,728 TOTAL 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600 P - provincial cash flow to be requested. 83.02.17 Page V-25 1983 BUDGET ESTIHATES DIVISION: Water Resource SECTION: Waterfront PROGRAM: Lake Ontario Waterfront Development PURPOSE: The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline, within the area of the Authority's jurisdiction, a handsome wate~front, balanced in its land uses, which will complement adjacent areas, taking cognizance of existing residential development and making available, wherever possible, featu~es which warrant public use. 1983 OBJECTIVES: - To commence development at Samuel Bois Smith. - To complete services and site work at Bluffers Pa~k. - To complete initial development at the Bluffers Toplands. - To provide internal access and servicing at East Point Park. - To continue Environmental Honitoring program. - To continue to provide pre-development maintenance. FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the Waterfront Capital Levy on all pa~ticipating municipalities. It is anticipated that revenue will be derived from the landfi11ing operation at the Samuel Smith Waterfront Area. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies' Real Services , Wages Utilities Equipment Property , Rents TOTAL ~ 109,500 15,300 10,000 1,396,461 1,531,261 83.02.17 . , Page V-26 1983 BlIlGET ESTIMATES DIVISION: Water Resource SEJ::TION: Waterfront progran: Lake Ontario waterfront Development - Capital I 1983 BlIXiET SOURCES <F PItwCING 1982 BWGET 1982 ACTUALS ACTIVITY NET PROVItcIAL KlNICIPAL EXPENDITURES REVEWES EXPENDITURES GRANI' LEVY OTHER EXPENDITURES REVENUES EXPEWITURES REVENUES $ $ $ $ $ $ $ $ $ $ Made CUrtis 55,000 55,000 27,500 27,500 30,000 31,486 SamSnith 400,000 150,000 250,000 125,000 125,000 75,671 92,910 Humber Bay West 130,000 130,000 65,00Q 65,000 268,000 280,586 Aquatic Park 40,000 40,000 20,000 20,000P 23,000 16,280 Ashbrldges Bay 5,000 5,000 2,500 2,500 15,000 14,797 Bluffers Top1arrls 100,000 100,000 50,000 50,000 1,000 1,184 Bluffers Park 330,000 330,000 165,000 165,000 550,000 549,519 East Point 344,261 344,261 169,500 172,131 2,630P 2,000 1,422 Petticoat Creek 5,000 5,000 2,500 2,500 4,000 3,302 Ajax Waterfront 30,000 30,000 15,000 15,000 25,000 24,991 K>ni tori~ 72,000 72,000 36,000 36,000P 72,000 73,193 Pre-Developnent Property M;]t. 20,000 20,000 10,000 10,000 20,000 20,861 Ihtnber Bav East 5,000 3.498 TO'fAL 1,531,261 150,000 1,381,261 632,000 690,631 58.630P 1,090,671 1.114.029 P - Provincial cash flow to be requested. 83 02. 17 . Page y!.:!. 1983 BUDGET ESTIMATES THE CONSERVATION LAND MANAGEMENT DIVISION This Division is responsible for the Watershed Recreation Program Which includes the planning, development, operation and maintenance of recreational uses of conservation lands and all related activities including the operations of the Authority's central stores. This Division is responsible for the implementation and administration of the Conservation Land Management Program for private landowners and the resource management of lands acquired as part of the Flood Control and Waterfront programs, eIcept those under management agreements with municipalities. I 82 08 06 I Page ~ 1982 ACHI EvmENTS Conservation Land ManaIement implementation of directives for Urban Management component, Resource Management Tracts and developed guide 1 nes for management of Environmentally Significant Areas prepared audio-visual on Urban Management for use with other public agencies increased assistance to landowners for "Conservation Plans", maintained same level as 1981 in plantings, woodlot mana1ement part cipated in municipal, Provincial and Federal programs to provide employment and training to unemployed and special groups Watershed Recreation finalized terms of reference and completed Phase I of Boyd Master Plan completed first of two phases to improve access for disabled to Conservation Areas . completed Indian Line Campground expansion Phase I and improvements to entrance to accommodate development of Highway 427 by Ministry of Transportation and Communications maintained Conservation Areas services at 1981 level initiated major maintenance program at all Conservation Areas 1983 PRIORITIES Conservation Land Management to reduce off-stream erosion and sedimentation through continued implementation of management programs on urban, rural and Authority lands to improve fisheries potential to maintain forestry management program Watershed Recreation to maintain level of service for visitors to Conservation Areas and Forest and Wildlife Areas, allowing for the reduction of the Major Maintenance program to continue the preparation of the Boyd Master Plan and complete the preparation of developed area Master Plans review the recommendations of the 1982 marketing studies, develop a program to improve faci 11 ties for visitor services and commence implementation 82 10 12 Page VI-3 1983 BIDGET ESTIMATES DIVISION: Conservation Land ttmaganent 1983 BWGET ~ (J! FINl\tCING 1982 BWGE'l' 1982 1IC'IUAIS PRoowt NET PROVUCI~L KJNIC I PAL EXPENDITURES REVEWES EXPENDITURES GRAm' LEVY 0'I1IER EXPENDITURES REVENUES EXPEtIlITURES REVEWES ~ ~ ~ ~ ~ ~ f} f} f} $ Program Adninistration 673,204 673,204 336,602 336,602 644 , 300 656,675 Watershed Recreation - Planning 75,000 75,000 37,500 37,500 120,000 76,457 - Developnent 181,960 181,960 80,000 85,490 16,470 627,000 148,928 - Operations 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218,076 999,040 Conservation Land Managanent 469,181 134,000 335,181 166,775 168,406 329,000 44,000 398,374 108,103 . TOTAL 3,548,345 1,150,000 2,398,345 620,871 1,760,998 16,470 3,924,000 1,044,000 3,498,510 1,107,143 83.02 17 . Page VI-4 1983 BUDGET ESTIHATES DIVISION: Conservation Land Hanagement PROGRAH: Program Administration PURPOSE: To provide support services, to administer and develop Authority owned conservation lands and to provide a program of conservation land management on public and private lands. Administration of the Central Services Workshop. 1983 OBJECTIVES: - To provide adequate staff and services to implement the 1983 programs, including the updating of developed area master plans, complete with operation and maintenance plans. FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services & Wages Utilities Equipment Property & Rents TOTAL $ 631,404 16,300 25,500 673,204 83.(12.17 Page VI-5 1983 BWGET ESTIMATES DIVISION: Conservation land Hanaganent Program: Program Administration 1983 BlIXiE'l' souRcES CF FINAN::ING 1982 BlIJGE'l' 1982 AC'I'Ul\LS ACTIVITY NET PROVItClAL K1NICIPAL EXPENDITURES REVEtIJES EXPENDITURES GRAN!' LEVY 0'I1IER EXPENDITURES REVENUES EXPEtIlITURES REVENUES ~ ~ 11 ~ Iii ~ ~ ~ Iii 11 Salaries, wages - Head Office 299,512 299,512 149,756 149,756 270,400 279,232 - Central Services 83,518 83,518 41, 759 41,759 88,000 77,902 Travel - llead Office 14,000 14,000 7,000 7,000 19,100 15,653 - Central Services 4,000 4,000 2,000 2,000 4,200 4,648 Benefi ts 248,374 248,374 124,187 124,187 242,100 237,634 utilities' Services - lIead Office 8,900 8,900 4,450 4,450 3,000 14,912 - Central Serv ices 14,900 14,900 7,450 7,450 17,500 26,694 TOTAL 673, 204 673.204 336 602 336,602 644,300 656,675 83.02.17 Page VI-6 1983 BUDGET ESTIMATES DIVISIONI Conservation Land Management PROGRAM Watershed Recreation Program - Planning PURPOSEI To provide long-term and site planning for the development and operation of Conservation Areas and Forest and Wildlife Areas 1983 OBJECTIVES I - To complete the Boyd Master Plan, initiated in 1982, to provide direction and accommodate external planning issues FUNDINGI This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities FINANCIAL COMMENTSI OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services & Wages Uti 11 ties Equipment Property & Rents TOTAL $ 4,000 71,000 75,000 82 10 12 Page VI-7 1983 BlDGET ESTIMATES DIVISION: Conservation Land Hanaganent Program: Watershed Recreation - Planning 1983 BlDGE'l' SOURCES CF FINl\tCING 1982 BUDGET 1982 AC'l'UALS ACTIVITY NET PROVItCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY O'l1IER EXPENDI~ REVEtIlES EXPENDI'ruRES REVENUES ~ ~ $ $ ~ ~ $ ~ ~ ~ Boyd Haster Plan Stage I 50,000 Boyd Master Plan Stage II 75,000 75,000 37,500 37,500 50,000 38,965 Planning & Design Services 20,000 37,492 TOTAL 75,000 75,000 37,500 37,500 120,000 76,457 83.02.09 . Page VI-8 1983 BUDGET ESTIMATES DIVISION: Conservation Land Hanagement PROGRAM: Watershed Recreation - Development PURPOSE: To develop grounds, facilities and services to provide outdoor recreation opportunities in accordance with the policies and program direction as established in the Watershed Plan. 1983 OBJECTIVES: - To continue improvements to Indian Line Campground including the construction of a 24 hour control building, and landscaping. - To complete improvements for access for the disabled tQ Conservation Areas. - To construct one indoor washroom building at Albion Hills Conservation Area. - To continue the award planting program. - To improve the safety of the entrance to the Cold Creek Conservation Area. FUNDING: This is normally a shared program, SOl of the funding being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. A special 75\ grant from the Province of Ontario is available for the access program for disabled persons. FINANCIAL COHMENTS: OBJECTIVE CLASS.IFICATIONS: Materials Salaries Supplies & Real Services & Wag es Utilities Equipment Property 5. Rents TOTAL $ 6,350 7,800 167,810 181,960 83.02.17 Page VI -9 1983 BlJDGET ESTIMATES DIVISION: Conservation Land Hanaganent Program: watershed Recreation - Development 1983 BUOOET SOURCES <F FlNAtCING 1982 BlDGE'I' 1982 l\C'IUALS ACTIVITY NET PROVI OCIAL KtiICIPAL EXPEmITURES REVENUES EXPENDITURES GRANl' LEVY O'l1IER EXPENDITURES REVENUES EXPEtiHTURES REVENUES ~ $ $ $ $ $ q $ $ $ Access - Disabled Persons 21,960 21,960 5,490 16,470 20,000 14,461 Indian Line - Control &1ilding 86,000 86,000 43,000 43,000 74,000 Albion Hills - Washroans 71,000 71,000 35,500 35,500 100,000 B.C.C.A. - Award Day 1,650 1,650 825 825 1,500 Cold Creek Entrance Development 1,350 1,350 675 675 Heart Lake - Washroans 100,000 Indian Line - WashrOQus 100,000 15,811 Indian Line - General 176,500 41 , 868 Nature Trail REilevelopment 15,000 15,288 TOrAL 181,960 181. 960 80.000 85.490 16,470 627,000 148,928 83.02.17 Page VI-I0 1983 BUDGET ESTIHATES DIVISION: Conservation Land Hanagement PROGRAH Watershed Recreation - Operations and Haintenance PURPOSE: To provide funding for the Operations and Haintenance component as identified in the Watershed Plan for providing recreation opportunities on Authority lands. 1983 OBJECTIVES: - To operate and maintain seven Conservation Areas and three Forest and Wildlife Areas to provide 1.1 million user days, eliminating the Hajor Haintenance program and the Canoe Instruction program. - To continue self-supporting visitor services programs to increase accessibility of recreation opportunities. - To maintain a high level of visitor safety. - To review the 1982 marketing plan and develop recommendations to improve visitor services. FUNDING: Program revenues provide approximately 48\ of required funding, the balance being a General Levy on all participating municipalities. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries SlIfPlies & Real Services Financial & Wages Ut li ties Equipment Property & Rents Taxes Expenses TOTAL $ 1,285,650 407,000 265,200 191,150 2,149,000 83.02.17 Page VI-ll 1983 BlIlGET ESTIMATES DIVISION: Conservation Land Hanaganent Program: Watershed Recreation - Operations and Haintenance 1983 BUOOE'I' SOURCES CE FINAtCING 1982 BWG:T 1982 AC'l1.V\LS ACTIVITY NET PROVItcIAL foI.WIC I PAL EXPENDITURES REVENUES EXPENDITURES GRANl' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ~ (l fi (l ~ II ~ II ~ ~ Albion lUlls 361,300 180,000 181,300 181, 300 358,350 195,000 401,344 183,175 Bo~ 210,950 103,000 107,950 107,950 229,500 107,700 219,384 87,144 Bruce's Hill 268,250 150,000 118,250 118, 250 273,750 168,000 266,679 144,006 Claireville 335,100 249,000 86,100 86,100 352,850 204,600 372,610 263,667 Cold Creek 191,OQO 74,000 117,000 117,000 178,850 73,500 182,290 77,724 Glen llaffy 137,800 43,000 94,800 94,800 145,450 33,400 129,070 42,743 Greenwood 165,300 43,000 122,300 122, 300 168,900 46,500 176,161 38,258 lIeart Lake 188,550 12,000 116,550 116,550 194,600 83,100 186,124 56,164 Palgrave 18,450 9,000 9,450 9,450 17 ,400 6,900 10,794 9,097 Petticoat Creek 238,350 93,000 145,350 145,350 233,050 81,300 249,114 97,062 General 33,950 - 33,950 33,950 51,000 23,906 TOTAL 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218.076 999.040 83.02.17 Page VI-12 1983 BUDGET ESTIMATES DIVISION, Conservation Land Management RETAIL SALES AREA GATE REVENUES PROGRAM REVENUES REVENUES TOTAL $ $ $ $ Albion lUlls 68,000 100,000 12,000 180,000 I Boyd 93,000 6,000 4,000 103,000 Bruce's Mill 90,000 35,000 25,000 150,000 C1airevil1e 62,000 19,000 2,000 83,000 Indian Line Campground -- 161,000 5,000 166,000 Cold Creek 21 , 600 21,200 31 , 200 74,000 Glen Haffy 29,900 9,600 3,500 43,000 Greenwood 31,300 11 , 500 200 43,000 Heart Lake 57,700 7,600 6,700 72,000 Palgrave 9,000 -- -- 9,000 Petticoat Creek 56, 200 33, 300 3,500 93,000 TOTAL 518,700 404,200 93,100 1,016,000 82 09 27 Page VI-I] 1983 BUDGET ESTIHATES DIVISION: Conservation Land Hanagement PROGRAH: Conservation Land Management PURPOSE: To provide technical assistance to private landowners to promote sound land management programs. To carry out resource management programs for Authority lands for water conservation, sediment control and fish and wildlife habitat improvement. 1983 OBJECTIVES: - To continue to provide reforestation, farm tree and shrub plantings, stream improvement and woodlot management to private and public landowners at the same level as in 1982. - To continue resource management on Authority lands at the same level as in 1982. - To continue the urban land program at a reduced level from 1982. - To ~ncrease revenues from plant propagation. , FUNDING: The Conservation Land Management Program is funded 55\ Provincial grants and 45\ municipal levy for water and related programs. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies' Real Services Pinancia1 , Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL $ 179,020 57,650 72,511 309,181 83.02.17 Page VI-14 I 1983 BUlXiET ESTIMATES DIVISION: Conservation Land Hanaganent Program: Conservation Land Managanent 1983 BlJDG:T SOURCES <F FINAtCIOO 1982 BWGE'l' 1982 IIC'ftJALS ACT I VI 'rr NET PROVnCIAL ....,ICIPAL EXPEmITURES REVEtuES EXPENDITURES GWlI' LEVY 0'I1IER EXPENDITURES REVENUES EXPENDITURES REVENUES (I (I (I (I $ (I $ $ $ (I Plant Propagation 123,170 120,000 3,170 1,744 1,426 40,000 30,000 119,674 96,267 Reforestation 22,700 2,000 20,700 11, 385 9,315 22,700 2,000 22,253 2,198 Urban ttmaganent 21,300 - 21,300 11,715 9,585 31,400 31,058 FalID Tree & . Shrub 17,900 10,000 7,900 4,345 3,555 17,900 10,000 17,932 9,638 Resource Hanaganent 13,500 - 13,500 7,425 6,075 21,400 20,357 Woodlot Managanent 33,293 - 33,293 18,311 14,982 27,000 24,555 Stream Improvanent 20,000 2,000 18,000 9,900 8,100 26,000 2,000 23,250 Forest Managanent 57,318 57,318 31,525 25,793 TOTAL 309,181 134,000 175,181 96,350 78,831 186,400 44,000 259 079 108,103 83.02 17 Page VI-IS 1983 BUDGET ESTIMATES DIVISIONI Conservation Land Management I PROGRAM I Conservation Land Management - Conservation Planning PURPOSEI To provide technical advice to private landowners to promote sound land management programs. To carry our resource management planning activities for Authority lands and technical advice to agencies managing Authority lands in urban areas. 1983 OBJECTIVES I - To continue to provide technical advice for reforestation, farm tree and shrub plantings, woodlot management, pond management and stream improvement to private and pub~ic landowners. FUNDINGI This program is funded 55' by Provincial grants and 45' municipal levy. FINANCIAL COMMENTSI OBJECTIVE CLASSIFICATIONS I Materials Salaries Supplies & Real Services Financial " Wages Utilities Equipment Property " Rents Taxes Expenses TOTAL $ 108,000 1,500 9,000 118,500 82.09 27 Page VI-16 1983 BIDGET ESTIMATES DIVISION Conservation Land Hanagement Program: Conservation Land Hanagaoent - Conservation Planning 1983 BIDGET SOURCES <F FINAtCING 1982 BlDGE'l' 1982 ACTUALS ACTIVITY NET PROVItCIAL KIUCIPAL EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEWES EXPENDITURES REVENUES $ $ $ $ $ $ $ $ ~ $ Conservation Planning 118,500 11B,500 65,175 53,325 90,000 90,471 . TOTAL 118.500 118,500 65 175 53.325 90.000 90.471 83.02.09 . Page VI-17 1983 BUDGET ESTIMATES DIVISION. Conservation Land Management PROGRAM. Conservation Land Management - Glen Haffy Fish Rearing PURPOSE. To carry out a program of fish rearing and stocking for selected Authority Conservation Areas and Forest and Wildlife Areas. 1983 OBJECTIVES. - To produce approximately 45,000 rainbow trout. FUNDING. Funding is provided 50\ by Provincial grant and 50\ municipal levy for this program FINANCIAL COMMENTS. OBJECTIVE CLASSIFICATIONS. Materials Salaries Supplies " Real Services Financial & Wages Utilities Equipment Property " Rents Taxes Expenses TOTAL $ 1,500 9,000 10,500 82 08 10 Page VI-18 1983 BUDGET ESTIMATES DIVISION Conservation Lard Hanaganent Program: Conservation LaM Hanaganent - Fish Rearing 1983 BlIX>ET OOURCES <F FINl\tcING 1982 BlIX>ET 1982 ACTUALS AcTIVITY NET PROVIteIAL K]NIC I PAL EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEtI.lES EXPENDITURES REVENUES ~ ~ ~ I;i .~ ~ ~ Ii S $ Glen Haffy - Fish Rearing 10,500 10,500 5,250 5,250 10,500 10,493 TOTAL 10,500 10,500 5,250 5.250 10,500 10 493 83.02.09 Page y!.::.!! 1983 BUDGET ESTIMATES DIVISIONI Conservation Land Management PROGRAM' Non-Revenue Pro rties PURPOSE: To provide funding for the maintenance of non-revenue producing recreation areas. 1983 OBJECTIVESI _ To maintain two Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use. FUNDING I Fun~iog is provided 100' by municipal levy on all participating municipalities. FINANCIAL COMMENTSI OBJECTIVE CLASSIFICATIONSI Materials Salaries Supplies " Real Services Financial " Wages Utilities ~uipment property " Rents ~ Expenses ~ $ 10,900 2,500 11,600 31,000 82 09 27 I Page VI -20 1983 BUDGET ESTIMATES DIVISION Conservat~on Land Hanaganent Program: Conservation Land Hanaganent - Operations and Maintenance - Non-Revenue 1983 BUDGET OOIJRCES (F FINAtCING 1982 BlIX2ET 1982 AC'lUAl.S ACTIVITY NET PROVItCIAL KJN IC I PAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEtIJES EXPENDITURES REVENUES fJ ~ $ (I ~ $ ~ ~ fJ ~ Operations and Maintenance - Non-Revenue 31,000 31,000 , 31,000 42,100 38,331 TmAL 31,000 31,000 31,000 42,100 38,331 83.02.09 Page VII-I 1983 BUDGET ESTIMATES THE INFORMATION AND EDUCATION DIVISION This Division is responsible for the Community Relations Program of the Authority. Conservation Information functions include: - the implementation of the general information programs, including the provision of both internal and external communications1 - information on resource management programs1 and - planning, market research, information and media contact. Conservation Education functions include: - conservation field centres1 - various historical and conservation interpretive progra~s1 and - the Kortright Centre for Conservation 82 09 28 Page VII-2 CONSERVATION INFORMATION 1982 Achievements . Provided, at an increased level of service, a Conservation Information Program for Authority members and staff, the general public and special interest and community groups. . Provided, through market analysis, a communications program for the Authority's public use facilities, completed a visitors' survey report; developed 8 market plan for Conservation Areas, Black Creek pioneer Village and Kortright Centre for Conservation. . Provided information on the Authority's resource management programs; tour of Etobicoke-Himico Watersheds. 1983 priorities . To maintain 1982 level of service in Conservation Information proyram. . To review and revise the communications program for Authority pub ic use facilities as required by the results of the marketing plan; to commence implementation in 1983 . To increase the level of information, through seminars and technical bulletins, on the Authority's resource management programs. CONSERVATION EDUCATION 1982 Achievements . Maintained the number of residential opportunities at the four residential field centres and day-use opportunities at Cold Creek Conservation Field Centre, Black Creek pioneer Village and Bruce's Hill. . Increased visitation to Kortright Centre for Conservation by 15,000. . Co-operated with York and Guelph Universities and the Canada Centre for Inland Waters in environmental research at Lake St. George. . Provided opportunities for special groups at residential field centres (March of Dimes, York University, Archaeology program) . . Developed theme programs for Kortright Centre in Fish and Wildlife, Water and Renewable Energy. . Commenced major maintenance at Albion Hills and Claremont Field Centres. 1983 priorities . To maintain the Qumber of residential and day-use opportunities. . To accommodate, 20,000 additional visitors at the Kortright Centre for Conservation. . To continue development of audio-visuals, exhibits and demonstrations for the Kortright Centre for Conservation. . . To increase the use of volunteers in the Black Creek pioneer Village program to reduce staff costs and increase funds available for operations and maintenance. . To continue to provide General Interpretive Programs at program cost. . To complete major maintenance at the Albion Hills Conservation Field Centre and to establish a major maintenance fund. . To establish a 2-c1ass residential centre at Albion Hills by agreement with the Board of Education for the Borough of Etobicoke. 83.02.17 . Page VII-3 1983 BlIX>E'r ESTIMATES DIVISION: Infoouation and Education 1983 BUDGET SOURCES (J!' FINl\tcIOO 1982 BUDGET 1982 AC'ltIALS PROORAH NET PROVItcIAL MUNICIPAL EXPEWITURES REVENUES. EXPENDITURES GRANT LEVY 011fER EXPENDITURES REVENUES EXPFIDITURES REVENUES $ $ $ $ $ $ $ $ $ $ Program rdnin. General 300,420 300,420 150,210 150,210 268,385 Infoou.SUpport 64,842 64,842 32,421 32,421 59,990 Education SUpp. 35, 108 35,108 17,554 17,554 32,117 Data Processing 15,000 15,000 7,500 7,500 415,370 415,370 207,685 207 , 685 360,492 352,512 Camlmity Relations Infoou. General 80,127 80,127 43, 170 36,957 74,100 63,830 Resource Hlt. 11,000 11,000 6,050 4,950 10,000 9,894 PlanningjMarket Analysis 90,243 90,243 90,243 125,000 124,260 CamiIIl i ty Relations Educ. Supv.~., Htce. 1,273,083 1,136,300 136,783 58,780 78,003 1,037,764 873,800 1,223,822 1,067,965 Supv.Ops.' Htce. KortrIght 442,000 264,850 177,150 19, 140 120,460 37,550 393,000 232,150 400,531 219,918 Supv.Ops.' Htce. B.C.P.V. * * 157,500 * 163,500 * (6,000) * 174,450 * 179,700 * 127,035 * 147,697 Developnent 114,800 114,800 9,600 105,200 .. 180,500 36,077 TOTAL 2,426,623 1,401,150 1,025.473 334,825 547,898 142.750 2.180.856 1,105,950 2,210,926 1. 287 . 883 * These amowlts are included in the Historical Sites Division aJdget, and do not add to totals here. ** Provincial cash flow eliminated in 1982. 83.02.17 Page VII-4 1983 BUDGET ESTIHATES DIVISION; Information and Education PROGRAH: Program Administration PURPOSE: To provide an administrative, supervisory and support service staff to implement a comprehensive information, community and staff relations and outdoor and conservation education program. 1983 OBJECTIVES: - To continue the programs carried out in 1982 at the same level of service. FUNDING: This is a shared program, 50\ of the funds from the Province of Ontario and 50\ from the general municipal levy. FINANCIAL COMHENTS; OBJECTIVE CLASSIFICATIONS: Materials Salaries SUfPlies & Real Services & Wages Ut lities Equipment Property & Rents Taxes TOTAL $ 390,610 24,700 415,370 83.02.17 Page VII-5 1983 B~ ESTIMATES DIVISION: Iofonnation and Fducation Program: Program Administration 1983 BUDGET SOURCES (F FINAtCING 1982 BlDGE'l' 1982 AC'IUALS ACTIVITY NET PROVItCIAL tllNIC I PAL EXPENDITURES REVENUES EXPENDITURES GRANT LEW OTHER BXPEtI>ITURES REVEHJBB EXPENJITURES REVmJES I} $ $ $ $ $ $ $ $ $ General Salaries 142,966 142,966 71,483 71,483 136,100 139,975 Expenses 4,800 4,800 2,400 2,400 6,500 12,676 Benefits* 124,237 124,237 62,118 62,119 125,785 101,021 Severance Pay 28,417 28,417 14,209 14,208 300,420 300,420 150,210 150,210 268,385 253,672 Camnnity Relations Inf. Support: salaries 61,142 61,142 30,571 30,571 56,490 58,703 Expenses 6~'~~~ 3,700 3~':~~ 3~':~~ 5~'~g 6~'~~~ ~ 64,842 ~ ~ ~ ~ CamllIli ty Relations Ell. Support: Salaries 33,908 33,908 16,954 16,954 32,117 33,312 Expenses 1,200 1,200 600 600 35,108 35,108 11,554 17 , 554 32,117 33,312 Data Processing 15,000 15,000 7,500 7,500 rofAL 415,370 415,370 207,685 207,685 360,492 352,512 · BenefIts - Inc lude benefits for all full-time, contract ind part-time enployees of the Infonnation aM mucation DIVISIon 82 02.17 Page VII-6 1983 BUDGET ESTIHATES I DIVISIONz Information and Education PROGRAM: Community Relations - Information - General PURPOSE: To provide b~ochures, still and motion picture photographic materials, exhibits and special functions to implement the internal and external general information program of the Authority. 1983 OBJECTIVESz - To maintain the level of service provided in 1982. FUNDING: This is a shared program, 55\ of the funds being available from the Province of Ontario and 45\ being funded from the general levy on all participating municipalities for publications and printing, photographic materials, tours and special days, applicable to Water and Related Land Hanagement program~; and financed on a 50\ Province of Ontario grant and 50\ general levy for all Conservation and Land Hanagement programs. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies , Real Services Financial , Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL $ 58,400 21,727 80,127 83.02.17 Page VII-7 1983 BlDGET ESTIMATES DIVISION: Infonnation and ~ucation Program: CatmlIlity Relations - Information - General 1983 BI.IOOET SOURCES (F FINAtCING 1982 BWGE'l' 1982 ACroALS ACTIVITY NET PROVItCIAL folJNIC I PAL EXPENDITURES REVEWES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPEWI'IURES REVmJES ~ 11 ~ 11 11 11 ~ 11 11 ~ Publications & PrlntiDJ 51,827 51,827 28,505 23,322 39,800 46,574 Photographic 1,700 1,700 935 765 1,200 742 Tours & Special Days 8,600 8,600 4,730 3,870 13,100 5,779 Motion Picture Program 8,000 8,000 4,000 4,000 12,000 6,733 Exhibits 8,000 8,000 4,000 4,000 4,000 3,272 Pranotional Contingency 2,000 2,000 1,000 1,000 1,000 730 Biennial Conference 3,000 TOTAL 80,127 80,127 43,170 36,957 74,100 63,830 83.02.17 Page VII-8 1983 BUDGET ESTIMATES DIVISION: Information and Education PROGRAM Community Relations - Information - Resource Management Programs PURPOSE: To provide information td the general public and specific audiences with respect to Authority Resource Hanagement Programs. 1983 OBJECTIVES: - To increase the number of technical/semi-technical bulletins published. - To arrange for resource management tours and seminars. FUNDING: This is a shared program, 55\ of the funds being available from the Province of Ontario and 45\ being funded from the general levy on all participating municipalities FINANCIAL COMHENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Pro~ & Rents Taxes Expenses TOTAL $ 9,500 1,500 11,000 83.02 iO Page VII-9 1983 BlIXET ESTIHATFS DIVISIOO: Infotmation aM B'lucation Program I CalInlIlity Relations - Infotmation - Resource Hanaganent Programs 1983 BtIlGET SOURCES (F FINAOCING 1982 BtIlGE'l' 1982 ACTUAIS ACTIVITY NET PROVIOCIAL K1NIC I PAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY 0'I1IER EXPEWITURES REVEtIJES EXPENDITURES REVENUES $ $ $ $ $ $ $ $ $ $ Watershed Plan Projects presentations aM sani- technical publ ications re Watershed Programs 11,000 11,000 6,050 4,950 10,000 9,894 TOTAL 11,000 11,000 6,050 4,950 10,000 9,894 83.02.17 . Page VII-IO 1?83 BUDGET ESTIHATES DIVISION: Information and Education PROGRAH: Community Relations - Information - Planning/Harketing Analysis PURPOSE To provide an effective communications program to maintain or increase visitation to Authority public use facilities. 1983 OBJECTIVES: - To review and revise the communications program based on the results of studies during 1982. - To implement a comprehensive marketing program. FUNDING: Funding is provided 100\ by municipal levy on all participating municipalities. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies' Real Services Financial , Wages Ut i li ties Equipment Proper t,y & Rents Taxes Expenses TOTAL $ 90,243 90,243 83.02 10 Page VII-11 1983 BlIX>ET ESTIMATES DIVISION: Infonnation and Education Program: CcmnlIlity Relations - Infonnation - Planning/Marketing Analysis 1983 BlIX>ET SOURCES (F FINMCIOO 1982 BtIlGE'l' 1982 AC'IUALS ACl'IVITY NET PROVIOCIAL KJNIC I PAL EXPENDITURES RE\lEWES EXPENDITURES GRANT LEVY OTHER EXPEN:>ITURES REVENUES EXI'EtJ)ITURES REVEHJES 11 11 11 ~ ~ ~ ~ 11 11 ~ Harketing Plan and Research 36,000 30,860 Support 34,000 34,000 34,000 32,000 24,571 Supplies 24,500 24,500 24,500 18,000 21,668 Pranotion and Advertising 31,743 31,743 31,743 39,000 47,161 roTAL 90, 243 90,243 90,243 125,000 124,260 83.02.18 I . Page VII-12 1983 BUDGET ESTIMATES DIVISION: Information and Education PROGRAM: Community Relations - Conservation Education - Supervision, Operations & Maintenance PURPOSE To provide ~n outdoor conservation education program for school student~ and other community groups at four (4) residential conservation field centres an~ a variety of outdoor and conservation education opportunities for the general public and school groups at Cold Creek, Bruce~s Hill and Black Creek. 1983 OBJECTIVES - To continue the program at the same level of service as in 1982 - To provide an outdoor and conservation education program for the following estimated number of students and adults Conservation Field Centres 13,500 (Residential) Cold Creek, Black Creek & General Interpretive Programs 78,000 - To complete major maintenance at the Albion Hills Conservation Field Centre. FUNDING Program revenues and the general levy on all participating municipalities. A surplus or deficit on the operations of the Boyd and Lake St. George Conservation Field Centres will, by agreement, be charged or credited to the participating Boards of Education The cost of supervisory staff at Albion Hills, Boyd, Lake St. George and Claremont is funded by a 55% grant from the Province of Ontario, 45% being funded from the general levy on all participating municipalities. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real Services Financial & Wages utilities Equipment Property & Rents Taxes Expenses TOTAL $ 679,900 90,000 19,000 484,183 1,273,083 83 02.18 Page VII-13 1983 BUDGET ESTIHA'ftS DIVISION: Information and Blucation Progrcm CamllIlity Relations - Conservation Blucation - Supervision, Operations and Haintenance 1983 ~ SOURCES (P FINAtCING 1982 BWGE'I' 1982 AC'l'UALS ACTIVITY NET PROVItCIAL . KlNICIPAL EXPENDITURES REVEOOES EXPENDITURES GRANT LEVY O'l1tER EXPENDITURES RE\IENlJF8 EXPEN)ITURES REVENUES $ $ $ $ $ iii $ $ $ $ Program Supervision 106,909 106,909 58,780 48,129 118,500 120,617 Boyd C. F .C. 228,000 228,000 147,000 147,000 222,586 213,784 Lake St. G!orge 443,000 443,000 287,000 287,000 406,552 415,354 Albion lUlls 203,000 203,000 191,000 191,000 197,967 188,860 , Claranont 207,000 207,000 191,000 191,000 193,780 194,816 Cold Creek F.C. 37,300 37,300 40,000 40,000 38,237 38,159 Gen. Interpretive 18,000 18,000 17,800 17,800 14,475 16,992 B.C.P.V. (Tours , PLP) * * 157,500 * 163,500 * (6,000) * 174,459 * 179,700 * 127,035 * 147,697 Hajor Htce.: Albion 29,874 29,874 29,874 29,464 11,855 Claranont 16,000 17,753 TOrAL 1,273,083 1,136,300 136,783 58,780 78,003 1.037 764 873,800 1,223,822 1,067,965 * These amounts are included in the Historical Sites Division Budget, and do not add to totals here. 83.02.10 Page VII-14 1983 BUDGET ESTIHATES DIVISION Information and Education PROGRAM Community Relations - Conservation Education - Supervision, Operations and Maintenance _ Kortright PURPOSE To provide a conservation education program for the public, school and other community groups at the Kortright Centre for Conservation. 1983 OBJECTIVES: - To provide program opportunities to 15,000 visitors over 1982 level, bringing visitation to approximately 90,000. FUNDING: Direct program costs are funded from fees, revenues for services, food and sale of merchandise. Basic operations are funded by a Ministry of Natural Resources grant of 55% on the Supervisor's salary, an H.T.R.C.F. grant of $11,500 from the Growth Endowment Fund, with the remainder from the general levy on all participating municipalities. FINANCIAL COHMENTS OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real ~ervices Herchandise & Wag es Utilities Equipment Property & Rents for Resale TOTAL $ 280,000 20,000 3,000 54,000 85,000 442,000 83.02.18 Page VII-IS 1983 BUDGET ESTIMATES DIVISION: Infounation and D3ucation Program: Caml\llity Relations - Conservation D3ucation - Supervision, Operations aM Haintenance - Kortright 1983 BUDGET 9JURCES <F FINAtCING 1982 BlDGET 1982 AC'l1JALS ACrI VI TY NET PROVItCIAL K1NICIPAL EXPEtIlITURES REVENUES EXPENDITURES GRANT LEVY 0'l11ER EXPEmITURES REVEWES EXPEmITURES REVENUES $ 1) $ ~ ~ $ $ $ $ $ Basic Operations 142,000 142,000 19,140 85,310 37,550* 193,000 198,744 Programs - General 300,000 264,850 35,150 35,150 200,000 232,150 201,787 219,918 1983 Portion of the Renewable Energy Program 183,493** 183,493 183,493 135,000 51,507 TOTAL 442.000 264,850 177 , ISO 19,140 120,460 37,550 393.000 232.150 400,531 219 918 * $11,450 Growth Endowment fUnd 26,100 H.N.R. Fish' wildlife Agreement $37,550 ** Hinistry of Energy fWlding for 1983 - amoWlt not included in totals. 83 02.18 Page VII-16 1983 BUDGET ESTIMATES DIVISION: Information and Education PROGRAM Community Relations - Conservation Education - Development PURPOSE To develop the facilities required for the Authority's outdoor and conservation education programs. 1983 OBJECTIVES - To continue development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation; - To develop additional indoor exhibits, furnishings and equipment for the Kortright Centre for Conservation - To develop additional residential conservation field centre accommodation at Albion Hills to be funded by The Etobicoke Board of Education. FUNDING: The outdoor development of the Kortright Centre for Conservation has been funded by a 55\ grant from the Province of Ontario, and 45\ from the general levy on all participating municipalities until the end of 1981. provincial priorities did not permit a grant from the Province of Ontario in 1982. Completion of the development of the Kortright Centre is required to meet resource management objectives, to increase visitation by 20,000 per year, to meet inflationary and service costs and to annually reduce the municipal levy. Funding for the outdoor development, exhibits, furnishings and equipment for this Centre will be required from The Metropolitan Toronto and Region Conservation Foundation and other sources. FINANCIAL COHMENTS: OBJECTIVE CLASSIFICATIONS Haterials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL $ 36,000 19,000 23,000 36,800 114,800 I 83 02 10 PageVII-17 1983 BlIXiET ESTIMATES DIVISION: InfoDllation and D3ucation progran: CamllIlity Relations - Conservation D3ucation - Developnent 1983 BIIX>E'l' OOURCES <F FINAOCING 1982 BmGE'l' 1982 J\CTUALS ACTIVITY NET KlNIl:IPAL EXPENDITURES REVEtlJES EXPENDITURES GRANT LEVY omER EXPENDITURES REVEHJES EXPENDITURES REVENUES $ $ $ $ $ $ $ $ $ $ KortrIght Developnent 100,000 100,000 100,000* 100,000** 36,077 FurniShings, Exhibits, Equipnent 56,500 Conservation Field Centre General Upgrade 24,000** Albion lUlls 14 , 800 14 , 800 9,600 5,200 TOTAL 114.800 114,800 9,600 105,200 180.500 36.077 E\mding sources UDcamlitted at tillS t:lme. ** provincial grant not approved. 83.02.17 . Page VIII-l 1983 BUDGET ESTIMATES TilE HISTORICAL BITES DIVISION This Division is responsible for the Heritage Conservation program, including the development and administration of the Black Creek Pioneer Village, Albion lIouse, historical markers and other historical buildings coming under the jurisdiction of the Authority. 82.08 06 I Page VIII-2 1982 ACHIEVEMENTS Operated all buildings at Black Creek Pioneer Village with interpretive staff and maintained grounds with own force and volunteer labour Maintained and improved provision of special events and programs Produced a comprehensive staff handbook Reviewed results of visitor survey and developed recommendations to improve communications and visitor services Commenced a program of local community youth involvement through the assistance of the Federal government Prepared an Operating Plan for Black Creek Pioneer Village for 1983-86. . 1983 PRIORITIES To continue to operate all buildings at Black Creek Pioneer Village with interpretive staff and maintain grounds in a cost-effective manner To increase public awareness of Black Creek Pioneer Village by increased communications with special groups and local community To maintain and improve programs and special events To continue to develop staff skills in interpretation and conservation techniques. To respond to visitor needs for improved food services, gift shop accommodation, student assembly and student/public orientation 82 08 09 Page VIII-3 1983 BIDGET ESTIMATES DIVISION: Historical Sites 1983 BlDGET OOURCES <F FINMCING 1982 BlIlGET 1982 ACTUALS l'ROGRAH NET PROVItCIAL KlNICIPAL EXPENDITURES REWaJES EXPENDITURES mANT LEVY OTHER EXPENDITURES REVEtlJES EXPENDI~ REVENUES $ $ $ $ $ $ $ $ $ $ Program Administration 273,122 273,122 94,843 178,279 248,700 260,599 Operations & Haintenance 1,487,200 1,025,000 462,200 260,200 202,000 1,492,000 1,040,500 1,458,808 925,016 . Conservation Education - Supervision 157,500 163,500 (6,000) (6,000) 174,450 179,700 127,035 147,697 Capi tal Developnent 1,995,000 1,995,000 . 1,995,000 1,930,000 89,902 IDrAL 3,912,822 1,188,500 2,724,322 94 843 432.479 2,197,000 3.845.150 1.220 200 1.936,344 1,072,713 83.02.17 Page VIII-4 1983 BUDGET ESTIHATES DIVISION: Historical Sites PROGRAH: Heritage - Administration PURPOSE: To provide supervisory and support services to implement the heritage conservation program. 1983 OBJECTIVES: - To provide the support services at the same level as in 1982 FUNDING: Provincial ~nd m~nicipal fundipg. " FINANCIAL COMHENTS: OBJECTIVE CLASSIFICATIONS: Haterials Salaries sU111ies & Real Services Financial 6. Wages Ut Hies Equipment Property & Rents Taxes Expenses TOTAL I $ 268,122 5,000 273,122 83 02 17 Page VI 11-5 1983 BlDGET ESTIMATES DIVISION; Historical Sites Program: Heritage - Administration 1983 BlIXE'l' SOURCES (J!' FINAN::ING 1982 BIDGE'l' 1982 ACroALS ACTIVITY NET PROVIICIAL tIlNIC I PAL EXPENDITURES REVmJES EXPENDITURES GWll' LEVY 0TffER EXPENDI1URES RIMHJEB EXPENDITURES REVENUES Ii Ii Ii (I (I $ e $ Ii Ii Sa1ades 45,000 45,000 22,500 22,500 40,900 43,076 Benefi ts 139,686 139,686 69,843 69,843 147,800 121,971 Travel 5,000 5,000 2,500 2,500 5,000 4,538 Vacation, Sick , Statutory Holiday Pay 83,436 83,436 83,436 55,000 91,014 TOTAL 273,122 273,122 94,843 178.279 248.700 260,599 83.02.17 Page VII 1-6 1983 BUDGET ESTIHATES DIVISION Historical Sites PROGRAH: Heritage - Operations and Maintenance - Black Creek Pioneer Village PURPOSE: To provide a living portrayal of a crossroads village in pre-Confederation Ontario. 1983 OBJECTIVES: - To continue to provide an educational, recreational experience for visitors to this heritage conservation project. - To increase attendance by 15,000 over 1982. - To provide a staff person to implement the recommendations of the 1982 marketing plan specific to the Village, particularly through increasing communications to tourists, conventions and special groups. - To continue to operate the Village in a cost-effective manner through reliance on existing staff, volunteer forces and increased local involvement; to maintain visitor spending; to review food services. - To develop and implement special events and programs to attract visitation. - To provide staff development and training; maintain collection; review conservation techniques. FUNDING 72\ of the funding comes from admission receipts, sales outlets and other Village operations. The remainder comes from municipal levy (15 3\) and balance by grant from the Ontario Hinistry of Citizenship and Culture. FINANCIAL COHHENTS: The budget estimates include funding for the recommendations of the Black Creek Operating Plan prepared in 1982, including enrichment of special programs and marketing staff. OBJECTIVE CLASSIFICATIONS Haterials Saliuies Supplies & Real Services Financial & Wages Utili ties Equipment Property & Rents Taxes Expenses TOTAL $ 934,100 266,900 286,200 1,487,200 83.02 09 I Page VIII-7 1983 BWGET ESTlHATFS DIVISION: IIistodcal Sites Program: Heritage - Operations and Maintenance - Black Creek pioneer Village 1983 BWGET SOURCES CF FiNl\tCING 1982 BlIXE'l' 1982 AC'IU\LS ACTIVITY NET PROVItCIAL ~ICIPAL EXPENI)IroRES REVEtIJES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEtIJES EXPENDlroRES REVENUES ~ $ $ ~ $ ~ $ IJ ~ $ Supervision 505, 100 3,000 502,100 345,100 157,000 445,000 5,000 434,264 2,403 Costume Dept. 23,500 1,000 22,500 22,500 22,500 1,000 25,766 761 Registrar 34,500 2,000 32,500 32,500 31,500 2,000 21,769 985 Gatehouse 24,500 505,000 (480,500) (480,500) 26,300 536,000 23,667 455,228 Giftshop-Entrance 130,200 205,000 (74,800) (74,800) 144,500 166,000 140,329 189,059 Giftshop-t\.lse\J1l 32,500 45,000 (12,500) (12,500) 60,400 80,000 37,131 39,538 h\:!ddings 8,800 20,000 (ll,200) (11,200) 11,500 22,000 12,601 18,772 Special Events 40,000 6,000 34,000 34,000 39,000 2,000 36,100 3,857 Livestock 91,000 4,000 93,000 93,000 88,500 5,000 95,176 3,107 Carpenter Shop 20,000 500 19,500 19,500 14,600 500 15,412 126 Peacock Woods 6,000 6,000 (4,000) 10,000 10,000 8,038 Food Operation 14,000 55,000 (41,000) (41,000) 14,000 50,000 36,910 43,545 Non-Designated Areas 41,000 41,000 6,000 35,000 41,200 43,243 Sleigh Rides 500 3,000 (2,500) (2,500) 500 1,000 295 3,129 Building Activit. 509,600 175,500 334,100 334,100 542,500 170,000 527,507 164.506 TOTAL 1,487,200 1. 025.000 462.200 260.200 202 000 1.492.000 1.040,500 1,458,808 925.016 83.02.10 I Page VI I 1-8 1983 BUDGET ESTIHATES DIVISION: Historical Sites PROGRAH: Heritage - Education Program PURPOSE: To provide conservation education opportunities for school groups by group tours and by a Pioneer Life program. 1983 OBJECTIVES: To maintain existing levels of service for 60,000 students combined in both Tour and Pioneer Life Programs. FUNDING The program is planned to be self-sustaining. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS: Haterials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL pioneer Life Program 33,300 9,500 18,600 61,400 Educational Tours 84,050 7,200 4,850 96,100 83 02.09 Page VI II -9 1983 BWGE'l' ESTIHATES DIVISION: Historical Sites Program: Heritage - Edocation ProgrWl 1983 BWGE'I' SOURCES 00 PINAN::: ING 1982 BtDGB'l' 1982 AC'lUALS ACTIVITY NET PRovnCIAL ~ICIPAL EXPENDITURES REWtIJES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEtlJES EXPENDITURES REVENUES ~ ~ (J (J (J Ii (J (J (J ~ pioneer Li fe Program 61,400 44,500 16,900 16,900 70,750 40,950 45,064 41,370 Edocational Tours 96,100 119,000 (22,900) (22,900) 103,700 138,750 81,971 106,327 TOTAL 157,500 163,500 (6,000) (6,000) 174,450 179,700 127,035 147,697 83.02.09 Page VIII-10 1983 BUDGET ESTIMATES DIVISION Historical Sites PROGRAM Heritage - Capital Development PURPOSE To carry out restoration and development work at the Black Creek pioneer Village in accordance with approved plans. 1983 OBJECTIVES: - To complete restoration of the Richmond Hill Hanse, Sawyers House and Nesbitt Sawmill. - To dismantle the Tinsmith's Shop and reconstruct at the Village. - To commence construction of the Visitors' Centre. FUNDING Funding sources for the capital development are expected to be the The Metropolitan Toronto and Region Conservation Foundation, Wintario, and special municipal contributions for the Visitors' Centre. FINANCIAL COHHENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages utili ties Equipment Property & Rents Taxes Expenses TOTAL $ 1,995,000 1,995,000 83.02.09 . Page VI 11-11 1983 BlDGET ESTIMATES DIVISION Historical Sites Program: lledtage - Capital Developnent 1983 BlIlGET SOURCES (F FINAtCING 1982 BUDGE'l' 1982 ACI'lIALS ACTIVITY NET PROVItCIAL fiJNIC I PAL EXPENDITURES REVEWES EXPEmITURES GRANT LEVY OTHER EXPENDITURES RIMHlES EXPENDITURES REVENUES ~ {J {J ~ ~ ~ ~ fj ~ !J Nesbitt Sawnill 85,000 85,000 85,000 100,000 11,929 Visitors ~ntre 1,800,000 1,800,000 1,800,000 1,800,000 12,828 Tinsnith 75,000 75,000 75,000 RichnoM Hill Manse and Sawyers Ilouse 35,000 35,000 35,000 30,000 5,145 I 'IUl'AL 1,995,000 1,995.000 1,995,000 1. 930.000 89.902 83 02 09 SCHEDULE "B" B-21 In accordance with Rule #6 - Rules for the Conduct of the Author~ty, ReSO.l.ution #88/75, as amended, the following are biographies of persons recommended for appointment to functional advisory boards: CONSERVATION LAND MANAGEMENT BELL, R.E. -born at Gilford, Simcoe County~ -educated at Bradford High School and O.A.C. Guelph~ graduated in Agronomy in 1949~ -joined Ontario Ministry of Agriculture, Extension Branch in 1949 ~ -1949-1952 - Assistant - Peterborough~ -1952-1960 - Woodstock - Oxford as Agricultural Rep.; -1960-1963 - Assoc. Dir. of Exten. OMAF, Queen's Park~ -1963-1970 - Ottawa as Area Co-ordinator and Farm Management Specialist for 14 Eastern Counties~ -1970 to present: Ag. Rep. in Peel at Brampton~ -member of Ontario Institute of Agrologists~ -served on Ref. & Land Use AS 1970-l977 inclusive~ -served on Cons. Land Mgt. AS 1978-l982~ -served on Conservation Farm SUb-Committee 1973-1982~ CALDWELL , S.W. -Member MTRCF - 1986-l972: Director MTRCF - 1973-1974~ VC M'I'RCF - 1975~ Director MTRCF 1976-l977~ -Appointed to MTRCA April 1976~ -served on Humber Valley and Reforestation and Land Use Advisory Boards 1976-1977: -Appointed to MTRCA by Govt. of Ontario July 1977-July 1980~ -served on Conservation Land Management & Humber Valley Advisory Boards, & Conservation Farm Sub- Committee 1978-81, and as member MTRCF 1978-l981~ -served on Information & Education and Humber Valley Advisory Boards,' and Conservation Farm Sub-Committee 1982~ -retired Television executive~ -owner-operator of farm in Albion TownShip. GARDHOUSE. GEORGE -born Toronto Gore Twp. and raised Chinguacousy Twp.: -farmed at present location since 1950: -Past President - Peel County Soil and Crop Improvement Association~ -Past President - Peel County Junior Farmers'~ -served 14 years as Provincial Director, Ontario Soil & Crop Improvement Association~ -Past President - Ontario Soil & Crop Improvement Association ~ -nine years as member of Chinguacousy Twp Council: -two years Deputy Reeve, Chinguacousy Township: -served on Peel Committee Services Board: -associated 18 years with MTRCA as Authority and advisory board member~ -assisted Authority by permitting Streambank Erosion Control Pilot Project to be undertaken on property GURNEY , FRED -resident of Brampton area for four years: -served two terms on the Heart Lake Residents' Association Executive - still active as member~ -hunter and dog trainer~ -keen interest in conservation - uses natural facilities of Claireville, Cold Creek, Glen Haffy, and Heart Lake for training and leisure activities t1cDEBMOT'l' , NEIL C. -graduated from University of New Brunswick with a Bachelor of Science degree in Forestry - 1954: -1954-1965 - worked with Detence Construction Ltd. at Camp Gagetown, M.B , Canadian National Railways, and about one year with the Santa Fe Railway in Los Angeles: -work in the above included such activities as timber salvaging, surveying, and construction: -since 1965, employed by the Department of Lands and Forests (now Ministry of Matural Resources) - last 11 years as a Management Forester in the Maple District: -since 1976, represented Maple District on MTRCA, and also served on the Forestry Technical Review Committee for the Kortright Centre. /2 B-22 -2- FLOOD CONTROL AND WATER CONSERVATION . GARDNER, MRS. F. EDNA -Member Board of Trustees of Ontario Science Centre; -very active on Garden Club of Toronto; -leading role in Garden Club project of landscaping Black Creek Pioneer Village; -played leading role in establishment of Garden Centre, for which she was recognised by the Garden Club; -leading role in acquisition of James Gardens by Metropolitan Toronto; -member of Citizens' Advisory Committee of the International Joint Commission; -M.T.R.C.A. 1957-1982 served on Historical Sites, Conservation Areas, Waterfront Advisory Boards; -Finance, Wildlife, Honour Roll, Recognition, and other Executive sub-committees: as Chairman and Vice-Chairman of various advisory boards and committees; Chairman of the Humber Valley Advisory Board 1960-1982; -M.T R.C.F. Member 1961-1967; Director 1968-1969; Vice-Chairman 1970-1973; Director 1974-1982. - . JAMES, PROF ROBERT L -Professor of Sociology at Scarborough College, University of Toronto; -formerly at University of Alberta, Montana State University, University of Nevada, obtained Ph D. at University of Oregon; -Research Consultant - Alberta Home & School Assoc ; -Research Association - Edmonton Council of Community Services; -Educational Consultant - Ministry of Education (Family Life Studies); -teaching interests - family; -research vocational versus marriage and family choices among senior public and secondary students on Ministry of Education grant; -presently resident of Scarborough; Canadian citizen; -appointee to Information and Education Advisory 1977-1982. . . /3 B-23 -3- aISTORICAL SITES BRADSHAW, JOHN -member of Historical Sites Advisory Board since 1974: -garden commentator on C.F.R.B. for more than 30 years -garden editor for several newspapers: -honoured for his horticultural knowledge and writings -active supporter of the Authority and the Black Creek Pioneer Villages frequently publicizes activities of Authority and Village on radio: -Honourary Reeve of Black Creek Pioneer Village for the years 1976 and 1977. McGINNIS, BRIG.-GEN. JOHN -member of the ~echnical Advisory Committee and Historical Sites Advisory Board since 1963: -appointed Director of the newly-restored Fort Yor~ by Toronto Civic Historical Committee in 1952: -presently Managing Director with the Toronto Historical Board: -actively involved with numerous military associations, the Architectural Conservancy of Ontario, Heritage Canada, Canadian Museum Association. the Company of Military Historians, the John Graves Simcoe Memorial Foundation, the American Association for State and Local History, the Institute of Public Administration of Canada, the Toronto-Amsterdam Twin City Committee, and the Convention and Tourist Bureau of Metropolitan Toronto. MEIL, MRS. ELSA -member of the Technical Advisory Committee and the Historical Sites Advisory Board since 1963: -prior to 1963, played a major role as consultant to the Humber Valley Conservation Authority in the design and construction of exhibits at the Dalziel Museum: -created the original concept of Black Creek Pioneer Village, and worked on its inception. RUSSELL, OR. LORIS -member of the Technical Advisory Committee and Historical Sites Advisory Board since 1964, -specialist in palaeontology - 40 years researChing prehistoric: life in western North America: -retired from pOSition of Chief Biologist, Royal Ontario Museum, in 1971, with title 'Curator Emeritus', and is Professor Emeritus of the University of Toronto: -began collecting historical material for Canadian Centenary while serving as Director of the National Museum of Canada: -research led to several noteworthy publications - detailed book on history of lighting in the 19th century, and an account of 19th century crafts and industries. SCOTT, DR JOHN -member of the Eiistorical Sites Advisory Board since 1975: -Director of Electroencephalographic Department at Toronto General Hospital for 30 years: -Professor of Physiology at University of Toronto: -Chairman of Toronto Historical Board and Chairman of the Museum Committee for the Academy of ~edicine: -member of the Medical Historical Club of Torontor -member of the Ontario Historical Societyr --member of the York Pioneer and Historical Societyr -member of the Canadian Society for the History of Medicine: -awarded the Medal of Service by the City of Toronto in 1975 . /4 B-24 -4- INFORMATION AND EDUCATION BROWN, C G. -B A degree in Honours Geography from University of Toronto in 1951~ -graduate from Ontario College of Education in 1952 -specialist's certificate in geography~ -Secondary School Principal's Certificate~ -Teaching experience: 1952-54 teacher at Bathurst Heights Secondary School in North York 1954-55 on leave of absence and taught in South America 1956-59 Head of Geography Department, Downsview Secondary School in North York . 1959-61 Assistant to Superintendent of Secondary Schools for North York Board of Education 1961-63 Principal of Emery Collegiate Institute, North York 1963-67 Principal of Earl Haig Secondary School, North York 1967-69 Area Supe~visor in North York 1969-72 Superintendent of Programme & Instruction 1972-74 Assistant Director of Education, North York 1974- Director of Metropolitan Toronto School Board -married with three children, and presently living in Toronto~ -appointee to Information and Education Advisory Board from 1975 through 1982 DOWNING, JOHN -political columnist for Toronto Sun~ -has worked for Toronto newspapers since 1958~ -has taken a number of environmental science courses at University of Toronto~ -is journalism graduate of Ryerson Poly technical Institute: -appointee to the Information and Education Advisory Board 1977-l982~ -Honourary Reeve of Black Creek Pioneer Village for 1978 and 1979~ -lives in Etobicoke with his~~ife and three sons DUNLOP, W JOHN -appointee to Information and Education Advisory Board since 1971~ -formerly Director of Public Service - Canadian Broad- casting Corporation~ -education - Jarvis Collegiate Institute - University of Toronto -married with two children~ -active service with R C N V R , -National Chairman of Public Relations - Canadian Red Cross Society, Canadian Cancer Society, Salvation Army: -member of fund-raising committees for disaster appeals, including Indian Cyclone Relief Fund, of which he was Chairman~ -member of Vatican Council II~ -on three occasions, has been International Broad- casting Official for Her Majesty the Queen~ -Life Honourary Member of International Red Cross~ -Order of Distinguished Auxiliary Service for the Salvation Army: -has Gold Cross from Greek Red Cross~ -Chairman of sev~ral film festivals in Bulgaria, Puerto Rico and Monte Carlo~ -former editor of 'Saturday Night' ~ -has Queen Elizabeth's Silver Jubilee Medal~ -member of Badminton & Raquet Club of Toronto and Canadian Club of New York~ -presently living in Mississauga~ /5 -5- INFORMATION AND EDUCATION HUHN, MRS. C.C. -primary teacher, Scottish Board of Education: -teacher, junior grades - Metro Separate School Board: -Outdoor Education Consultantl Dufferin-Peel Separate School Board: -Secretary-Treasurer - K.D. Huhn Ltd. : -1974-1982: Member Town of Caledon Public Library Board -1978-19821 Vice-chairman of above Board: also Chairman Finance Committee, Chairman Planning Committee: from 1978-1980 Chairman Personnel Committee: -member Albion Bolton Community Centre Expansion Comm.: -primary and secondary education: Scotland -post graduate studies - Craiglockhart College of Education: Humber College - Lanquages: -other interests: Beaver Leader, Palgrave 1st: Softball coach: Catholic Women's Leaque (Executive 1975-1980): winter sports: travel. -married with two children: husband Klaus D. Huhn, President of K.D. Huhn Ltd.: K.D.H. Industries: K.D.H. Services Ltd.: K.D.H. Services Ltd. LEITH, DR. T.B. -Professor, Department of Natural Science, Atkinson College, York University: -B.A.(Honors) U. of T. Geophysics: M.A. U. of T Geophysics: PLD M.I T. Geophysics: PLD Philosophy (of Science): consultant to Ontario Centennial Science Centre: Member Board of Governors of Seneca College of Applied Arts &. Technoloqy: Member and Past Chairman of Scarborough Public Library Board: -Member of Philosophy of Science Association, History of Science Association, American Geological Institute, American Scientific Affiliation, American Association for Advancement of Science, Society for the Sigma Xi, Canadian Society for History &. Philosophy of Science: -Member MTRCA 1975-1982: Member MTRCF 1977-1978: Director-MTRCF 1979-1983: -Member I&.E Advisory Board 1975-1979: Vice-chairman of this Board 1978: Chairman 1979-1982: -served on Don Valley Advisory Board 1975-1982: -served on Personnel, Conservation Farm Sub-COmmittees: -chair~n Marketing Plan Sub-COmm 1981-1982: Chairman Renewable Energy (Kortright): Authority representative to B Harper Bull Conservation Fellowship Award Committee 1976 until appointment of successor m:LLIGAN, B E -educated in Hamilton, Ontario, both elementary and secondary: -attended College of Education, University of Toronto and obtained B.A. in 1945, and M Ed in 1960: -teaching experience Director of Guidance for Hamilton Sep Sch System Master of Peterborough Teachers' College Inspector of Separate Schools in Peterborouqh area -Director of Education for Metropolitan Separate School Board: -member of Albion Bills Conservation School Management Advisory Committee 1967 and 1968: -member of Conservation Education Advisory Committee 1969 to 1972: -appointee of Information &. Education Advisory Board 1973-1982: -presented with Colonel Watson Award by Ontario Association for Curriculum Development 1978: -married with nine children, and presently living in Toronto. /6 -6- INFORMATION AND EDUCATION ZAJAC, MRS DOROTHY -Attended University of Toronto, graduating in 1956 in Physical and Health Education: -Taught school for several years: -Attended two-year public relations course "Friends of Seneca" : . -Trustee of York Region Board of Education for past eight years: -Past Chairman of the Board in 1980: -Served as Chairman of Study Committee on Outdoor Education; -Married to a doctor: they have two sons - one studying veterinary medicine, and the other working in the field of conservation; -Has travelled North American and European continents extensively. -served on Information & Education Advisory Board 1982: WATERFRONT BREEN, M J -Councillor, Village of Long Branch 1953-1958: , -Board of Education 1958-1961; -Founding Member & Past President Mechanical Contractors' Association~ -Appointed by the Government to the Building Code Commission for the Province of Ontario: -Fourth generation of family to live whole lifetime in Toronto area -served on Etobicoke-Mimico Authority 1956; -M T R C A - 1957-19821 -served on Etobicoke-Mimico Advisory Board~ Flood & Pollution Control Advisory Board: Conservation Areas Advisory Board: Personnel and Wildlife Sub-Committees: Administrative Office SUb-Committee: Kortright Building Sub-Committee; as Chairman and Vice-chairman of various advisory boards and sub-committees; Chairman of the Waterfront Advisory Board 1973-1982; NORTON. G F R -served with R C N V R 1943-1945 inclusive: -graduated University of Toronto, Civil Engineering 1952: -represented Canada in sailing Olympics of 1960, 1968. 1972: -Past Commodore of Royal Canadian Yacht Club: -Past Vice-Chairman of Sail Ontario~ -Manager of Special Projects' Department at Mollenhauer Limited -member of APEO and Engineering Institute of Canada; -Director of Board of Toronto Brigantine I'ncorporated -Waterfront Advisory Board apointee 1974-1982 inc1 ; -married with three children B-27 SCHEDULE "C" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SALARIES AND WAGES 1983 Waqe Rates - Supplementary Food Service Staff Onder 18 Over 18 Bus Person Level 1 $2.6S-3.00/hr $3.S0-3.75-4.00/hr Cleaners Level II $2.65-3.00/hr $3.50-3.90-4.25/hr Counter Server Level 1 $2.6S-3.00/hr $3.50 (Leadhand 4.00) (1) Waiter/Waitress Level II $3.50 + tips (Leadhand 4.00) Cashier Snack Bar Level I $3.7S-4.2S-4.S0/hr Cashier Full Service Level II $3.75-4.S0-4.7S/hr Bartender $4.00-4.7S-S.S0/hr Assistant Cook $2.65-3.00/hr $3.50-4.S0-S.00/hr 2nd Cook Level I $S.SO-7.00/hr 1st Cook Level II $7.00-10.00/hr Unit Assistant Level I $4.S0-S.S0-6.S0/hr unit Assistant Level II (2) S6.50-7.00-7.S0/hr Unit Assistant Level III (3) $3S0.00-36S.00-385.00/wk Area Assistant (3) S350.00-36S.00-38S.00/wk (1) Relief for Unit Assistant (2) Equivalent to GOl (3) Equivalent ;0 G03 KM/mrp 1982 02.09 I . 1983 BUDGET ESTIMATES DIVISION Finance and Administration PROGRAM: Administration PURPOSE To provide food services at the refreshment stands, Half Way House, Kortright Centre for Conservation and the Conservation Field Centres 1983 OBJECTIVES - to provide a high quality food service that is attractive to all visitors, - to maximize net revenue from the food operation. FUNDING This program is funded from revenues FINANCIAL COMMENTS: The net revenues will be used to offset operating and maintenance costs in the areas where the revenues are produced OBJECTIVE CLASSIFICATION: Materials . Salaries Supplies & Real Services Financial & Wages Utili ties Equipment Property & Rents Taxes Bxpenses TO'l'AL [I) 0 ffl 0 Cl f;; bl a I 0 to.> a Q) . 1983 DUDGET ESTIMATES Page FOOD SERVICES 1983 BUDGET ** 1982 ACTUALS PROGRAM NET REVENUE NOTES EXPENDITURES REVENUE (EXPENDITURES) EXPENDITURES REVENUE ~ $ ~ ~ ~ PROGRAM ADMINISTRATION 156,150* 156,150* CONSERVATION LAND MANAGEMENT DIVISIO~ 1 Refreshment Stands j 2 Group Catering 145,900 167,000 21,100 176,435* * Sub-Total 145,900 167,000 21,100 HISTORICAL SITES DIVISION 1 Half Way House 259,000 290,000 31,000 308,631* * 2 Refreshment Stand 103,000 113,000 10,000 115,289* * 3 Group Catering (included in 1 and 2 above) Sub-Total 362,000 403,000 41,000 INFORMATION & EDUCATION DIVISION 1 Conservation Field Centres 259,417 259,417 294,813 294,813 2 Kortright Centre (a) Refreshment Stand J (b) Dining Room 46,000 56,000 10,000 * Shown seps ately here, bu included in (c) Group Catering all expenc Otures Sub~Total 305,417 315,417 10,000 ** 1983 BudgE: - March 1st tc Dee 31st/19 113 *** 1982 Actus s - January 10 to Dee 12/8 AUTHORITY GROUP CATERING 20,000 20,000 TOTALS 833,317 905,417 72,100 . ~ B-30 , the metropolitan toronto and region conservation authority minutes REPORT 12/83 EXECUTIVE COMMITTEE 9-MARCH-1983 .2/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 9-March-1983. PRESENT Chairman Mrs. F E. Gell Vice-Chairman E.V. Kolb Members. W.G. Barber M.W.ft. Biggar E. Fulton Mrs. L. Hancl!y H.C. Lawrie S.A. Macpherson Ms. S. Nimmo J S. Scott Mrs. N. Stoner MINUTES Res. 133 Moved by: Mrs. N. Stoner Seconded by H.C. Lawrie. THAT the Minutes of Meeting' tl/83 be approved. CARR:):ED. SEC'l'10N I NO' ITEMS' SEC'l'10N II ITEMS FOR' CONSIDERATION l. APPLICATIONS FOR PERMIT ONDER ONTARIO REGULATION 170 Res. .34 Moved by: Mrs. L. Hancey Seconded by: Mrs. N. Stoner THAT the applications listed. herein as A(l) to, A(8) inclus-i ve,. be. approved', subject to the conditions. contained in the reports., CARRIED. A(1) The Regional Municipality of Peel To alter section of branch of the Etobicoke Creek south of' Orenda Road, City of Brampton Subj ect to: (a) All work being done, in accordance wi th Sheet' 2,- Plan t4598-0, as prepared' by- The Regional Municipali ty of Peel anq. dated' January, 1981: (h) All disturbed areas being restored to the satisfaction of the Authority. , 6-31 -2- A(2) Markland Wood Country Club To construct refreshment stand south of Bloor Street, Borough of Etobicoke (Etobicoke Creek Watershed) Subject to All work being carried out in accordance with the site and detail plans submitted with the application. A(3) 372023 Ontario Limited To place fill on the east side of Islington Avenue, south of Finch Avenue, Borough of Etobicoke (Humber River Watershed) Subject to: All grading being carried out in accordance with the site plan prepared by E I. Richmond Architects and dated January 7, 1983. A (4) York Regional Roman Catholic Separate School Board To construct storm sewer outfall into the Burndenette Creek to drain St. Matthew School property at *75 Waterbridge Lane, Onionville (Rouge River Watershed) Subject to: (a) All work being completed in accordance with Project ~8205, Drawing #M-l, dated December 22, 1982, by McGregor Allsop Ltd., and Drawing SK-l dated February 28, 1983, by Bruno Appollonio, Architect; (b) All disturbed areas being restored to the satisfaction of the Authority and the Town of Markham. A(5) Sandgate Construction Ltd. To build addition to building at t79-81 Main Str~et, Stouffvil1e (Duffin Creek Watershed) Subject to: (a) All work being completed in accordance with Drawing ~768, dated February 21, 1983, prepared by the applicant, which shall form part of the permit; (b) All disturbed areas being restored to the satisfaction of the Authority A(6) York Hannover Developments Ltd To construct watermain crossing of the Etobicoke Creek, south of Highway #401, east of Dixie Road, City of Mississauga Subject to: (a) All work being done in accordance with Drawing '1, prepared by Orban Engineering COnsultants and dated January 17, 1983; (b) All disturbed areas being restored to the satisfaction of the Authority. A(7) City of Mississauga To construct two footbridges across the Mimico Creek, east of Goreway Drive, north of Morning Star Drive, City of Mississauga Subject to: (a) All work being done in accordance with Drawing #22, prepared by the City of Mississauga Recreation and Parks Department and dated February, 1983; (b) All disturbed areas being restored to the satisfaction of the Author.i ty -3- B-32 A(8) Schickedanz Brothers Limited To construct storm water detention pond with low-flow channel and outfall structure, east of Yonge Street, north of Hillsview Drive, Town of Richmond Hill (Don River Watershed) Subject to (a) All work being done in accordance with Drawings Nos 22 and 27, dated May and July, 1982, and prepared by M.M Dillon Limited; (b) All disturbed areas being restored to the satisfaction of the Authority 2. PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF PEEL -1984 Erosion Control Program #2130 Dundas Street West and #6469 Netherhart Road, City of Mississauga Res #35 Moved by M.W.H. Biggar Seconded by E V Kolb THAT the adopted recommendation by the Council of The Corporation of the City of Mississauga at its meeting on February 14, 1983, with respect to the Authority's Project for Erosion Control and Slope Stabilization in The Regional Municipality of Peel, be received; THAT the City of Mississauga be advised that the Authority will include, in its 1984 Erosion Control Program, the erosion sites located at #2130 Dundas Street West and #6469 Netherhart Road; AND FURTHER THAT remedial works will be carried out subject to the avail- ability of funding CARRIED 3 CITY OF BRAMPTON -Request for Permanent Easement West of Scott Street in the Rosalea Park Area Res #36 Moved by J S Scott Seconded by E V Kolb WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from The Corporation of the City of Brampton to grant a permanent easement across Authority-owned land required to facilitate a storm sewer in the Scott Street and Rosalea Park area; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with The Corporation of the City of Brampton in this instance; THAT a permanent easement, containing 0 051 acres, more or less, be granted to The Corporation of the City of Brampton for a storm sewer located west of Scott Street; said land being Part of Lots I and II, and Part of Scott Street, Plan BR-15, City of Brampton (The Regional Municipality of Peel) , designated as Parts 1 and 2 on Plan 43R-I0529 Consideration to the nominal sum of $2.00, pI us all legal, survey, and other costs; THAT said easement be subject to an Order-in-Council being issued in accord- ance with Section 21(c) of The Conservation Authorities Act, R S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED B-33 -4- 4 THE MUNICIPALITY OF METROPOLITAN TORONTO -Request for Authority-owned Land For Re-alignment of Albion Road, Vicinity of the Claireville Conservation Area Res 137 Moved by Mrs. N Stoner Seconded by M W.H Biggar WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from The Municipality of Metropolitan Toronto to grant a conveyance of Authority-owned land to facilitate the re-alignment of Albion Road in the vicinity of the Claireville Conservation Area; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with The Municipality of Metropolitan Toronto in this instance; THAT a conveyance of 0 017 acres, more or less, be granted to The Municipality of Metropolitan Toronto for the re-alignment of Albion Road in the vicinity of the Claireville Conservation Area; said land being Part of Lot 15, Concession IX, E H.S , City of Brampton (The Regional Municipality of Peel), designated as Part 1 on Plan 43R-l0527 Consideration to be the sum of $2 00, plus all legal, survey, and other costs; THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 2l(c) of The Conservation Authorities Act, R S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effec,t thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED 5 LAND ACQUISITION PROJECT 1982-1984 ETOBICOKE CREEK WATERSHED -Property Commercial & Home Builders Ltd , West of the West Mall, north of The Queensway, Borough of Etobicoke Res 138 Moved by Mrs N Stoner Seconded by S A Macpherson THAT the report (February 28, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorised and directed to complete the purchase CARRIED "Re Project; Land Acquisition Project 1982-1984 Flood Plain & Conservation Land Component - Etobicoke Creek watershed Authority Executive Resolution 188, Meeting 14 - April 8, 1981, and Authority Resolution 138, Meeting 13 - May 15, 1981 Subject property West of The West Mall Owners Commercial & Home Builders Ltd Area to be acquired 0 841 acres, more or less Recommended purchase price Nominal consideration of $2 00, plus vendor's legal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a larger property, being Part of Lots 13 and 14, Concession III, CST" Borough of Etobicoke (The Municipality of Metropolitan Toronto, located west of The West Mall and north of The Queensway -5- B-34 "Negotiations have been conducted with the owners and their solicitor, Mr J R C Cermak, Q C , of Messrs Sm i th, Lyons, Torrance, Stevenson & Ma ye r , Suite #3400, Exchange Tower, P O. Box 420, 2 First Canadian Place, Toronto, M5X IJ3, and, subject to the approval of your Committee, agree- ment has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2 00, plus vendors' legal costs, with date of completion of the trans- action to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401 - Flood Control Land Acquisition " 6 CONSUMERS' GAS COMPANY -Occupancy of Authority-owned Lands East side Ellis Avenue, north of Lakeshore Boulevard Res 1139 Moved by Mrs N Stoner Seconded by J S Scott THAT the communication of The Metropolitan Toronto Clerk, dated February 16, 1983, concerning the occupancy of Authority-owned lands on the east side of Ellis Avenue and north of Lakeshore Boulevard, be received; AND FURTHER THAT the Metropolitan Toronto Clerk be advised that the Authority concurs with the recommendation adopted by the Council of The Municipality of Metropolitan Toronto at its meeting held February 15, 1983, concerning this matter CARRIED 7 QUOTATION #CLM83-09 -Two Log Splitters The following quotations were received for the supply and delivery of two new 1983 log splitters Roper Model W59AR, including applicable taxes Roper Canada Limited $2,694 26 Nobleton Farm Service Ltd 2,993 86 A J Equipment Sales Ltd 3,199 09 Southam's Lawn Mower Service 3,209 89 Res #40 Moved by Mrs N Stoner Seconded by Mrs L Hancey THAT the quotation of Roper Canada Limited for the supply and delivery of two (2 ) new 1983 log splitters, in the sum of $2,694 26, including all applicable taxes, be accepted; it being the lowest proper quotation received CARRIED 8 QUOTATION #CLM83-10 -Four Riding Lawn Mowers The following quotations were received for the supply and delivery of four new 1983 model Riding Lawn Mowers, three with trade B-35 -6- Southam's Lawn Mower Service $16,478 00 Outdoor Power Equipment Inc. 17,521 51 A J Equipment Sales Limited 17,823 85 Snowball Enterprises (82 model) 17,932 45 Ken Maynard's Services Ltd 19,243 63 A J Equipment Sales Limited 19,392 29 Snowball Enterprises 20,325 97 Nobleton Farm Service 21,079 00 Henry's Lawn & Garden Equipment 21,400 00 Clark Moore Motors 22,079 45 Turf Care Products Limited 22,470 00 Otto Richter & Sons Equipment Ltd 23.329 25 Res. #41 Moved by Mrs N Stoner Seconded by M W.H. Biggar THAT the quotation of Southam's Lawn Mower Service, for the supply and delivery of four (4) new 1983 model riding lawn mowers, in the sum of $16,478 00, including all applicable taxes, be accepted; this being the lowest quotation received CARRIED 9 ENVIRONMENTAL ASSESSMENT REPORT EAST METRO TRANSPORTATION CORRIDOR -Highway #402 to Proposed Highway #407 Mr M W H Biggar was absent during discussion of this item Res #42 Moved by Mrs L. Hancey Seconded by E V Kolb THAT the staff communication regarding the Ministry of Transportation & Communications Report for East Metro Transportation Corridor be received; AND FURTHER THAT the Ministry of the Environment be requested to provide copies of the "Type 1" Environmental Assessment Report on the proposed East Metro Transportation Corridor (EMTC) to the Borough of Scarborough and to the Chairman of the Authority's Rouge-Duffin-Highland-Petticoat Advisory Board CARRIED 10 HOUSE RENTAL POLICY TO DESIGNATED STAFF Res #43 Moved by Mrs L. Hancey Seconded by E V Kolb THAT the rental rate for 1983 remain at $450 00 a month for the dwelling occupied by the Superintendent of the Kortright Centre for Conservation, and $500 00 a month for all other dwellings; THAT the rental rate be reviewed annually, and up-dated, if necessary, effective January 1, 1984; THAT the rental rate be paid one-half in cash and one-half in taxable benefit, implemented in two phases January 1983 Superintendent of Kortright $200 rent/$lOO taxable benefit Others $200 rent/$125 taxable benefit January 1984 and subsequent years the full rental rate and any increase to the rental rate will be divided equally between cash payment and taxable benefit; AND FURTHER THAT Resolution #43, as set forth herein, supersede Resolution #236 of Executive Committee meeting held August 18, 1982 CARRIED -7- B-36 11 1983 BIENNIAL TOUR - ONTARIO CONSERVATION AUTHORITIES -Lakehead Region Conservation Authority September 18-21, 1983 Res #44 Moved by M.W H Biggar Seconded by S.A. Macpherson THAT the staff communication, together with the memorandum received from the Chairman of the Lakehead Region Conservation Authority, having regard to the 1983 Ontario Conservation Authorities' Biennial Tour, be received for information. CARRIED 12. BLACK CREEK PIONEER VILLAGE -Visitor Centre Res #45 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the staff communication, together with the letter dated March 4, 1983, received from The Honourable Bruce McCaffrey, Minister of Citizenship and Culture, be received; AND FURTHER THAT the Minister's letter, conveying approval of a Wintario Capital Grant, in the maximum amount of $530,000 00, for construction of the the Black Creek Pioneer Village Visitor Centre, be appropriately acknowledged CARRIED NEW BUSINESS 13 1983 AMERICAN PLANNING ASSOCIATION NATIONAL PLANNING CO~FERENCE -April 16-21, 1983 Seattle, Washington Res #46 Moved by M W H Biggar Seconded by W G Barber THAT Mr Edward Fulton be authorized to attend the 1983 American Planning Association National Planning Conference, scheduled to be held April 16-21, 1983, in Seattle, Washington; AND ~URTHER THAT his expenses in connection therewith be paid CARRIED 14 TERMINATION On motion, the meeting terminated at 10 40 am, March 9 Florence Gell W E Jones ChaIrman Secretary-Treasurer KC ~ B-37 , the metropolitan toronto and region conservation authority minutes REPORT '3;83 EXECUTIVE COMMITTEE 23-MARCH-1983 '3;83 The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview, on Wednesday, 23-March-1983. PRESENT FOR THE HEARING Chairman Mrs. F.E. Gell Vice-Chairman E.V. Kolb Members (For Ms. S. Nimmo) J.A. Bryson E. Fulton H.C. Lawrie S.A. Macpherson (For W.G. Barber) L. Martin J .S. Scott Mrs. N. Stoner HEARING Following the roll call, the meeting recessed to hold a hearing re Mr Henry Natale Town of Richmond Hill Humber River Watershed PRESENT FOR THE MEETING Chairman Mrs. F E. Gell Vice-Chairman E.V Kolb Members M W.H Biggar (For Ms S. Nimmo) J A. Bryson E. Fulton Mrs L Hancey H.C Lawrie S A Macpherson (For W.G Barber) L. Martin J S. Scott Mrs N Stoner ABSENT Members W.G. Barber Ms. S. Nimmo MINUTES Res. H7 Moved by: E.V Kolb Seconded by Mrs N. Stoner THAT the Minutes of Meeting #2;83 be approved. CARRIED. SECTION I NO ITEMS SECTION II ITEMS FOR INFORMATION 1. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res. H8 Moved by E.V Kolb Seconded by: Mrs N. Stoner THAT the applications listed herein as A(l) to A (4) inclusive, be approved, subject to the conditions contained in the reports CARRIED B-38 -2- A(l) Borough of Scarborough To stabilize southern bank of Knob Hill Interceptor watercourse behind ~94-#100 Citadel Drive (Highland Creek Watershed) Subject to All work being completed in accordance with drawings prepared by the applicant, which shall fo~ part of the permit. A(2) Borough of Scarborough To stabilize banks of the Massey Creek, west of Kennedy Road, between Foxridge Drive and Eglinton Avenue (Don River Watershed) Subject to: All work being completed in accordance with drawings prepared by the applicant, which shall fo~ part of the permit. A(3) Candevcorp Limited To erect commercial building on north side Highway #7 (Wellington Street), west of the Kennedy Road By-Pass, unionville Town of Markham (Rouge River Watershed) Subject to: All works being completed in accordance with Project #8253, Drawing Al, dated March 7, 1983, by William Azzalino, Architect, as amended, and a detail of the guardrail around the parking lot, which shall form part of the permit. A(4) The Municipality of Metropolitan Toronto Works Department To construct gabion retaining wall on west bank of the Etobicoke Creek, south of Dundas Street East, City of Mississauga, Subject to All work being carried out in accordance with Drawing #1239-D-II029, as prepared by The Metropolitan Toronto Works Department 2 LAND ACQUISITION PROJECT 1982-1984 ROUGE RIVER WATERSHED -Property Corporation of the Town of Pickering West of Altona Road, north of Highway #2, Res #49 Moved by: Mrs L. Hancey Seconded by: M.W H. Biggar THAT the report (March 15, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorised and directed to complete the purchase CARR !ED "Re Project Land Acquisition Project 1982-1984 Flood Plain & Conservation Land Component - Rouge River watershed Authority Executive Resolution #88, Meeting H - Apr il 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property West of Altona Road Owners Corporation of the Town of Pickering Area to be acquired o 702 acres, more or less Recommended purchase price Nominal consideration of $2.00, plus vendor's legal costs -3- B-39 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being part of Lots 33 and 34, Range 3, B.F.C., Town of Pickering (The Regional Municipalify of Durham), located west of Altona Road, north of Highway t2. "Negotiations have been conducted with officials of the Town of Pickering, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2.00, plus vendor's legal costs, with date of completing the trans- action to be as soon as possible. "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-11-401 - Flood Control Acquisition." 3. QUOTATION iCLM83-06A -5 New 1983 Trucks The following quotations were received for the supply and delivery of five new 1983 trucks, complete with cab, chassis, and platform (two 1-ton and three 3/4-ton trucks), and including licences, except where noted Yorkview Ford Sales $74,940 46 H A. McLean Chev Olds Ltd. 76,599.16 + licence Eric Matson Motors Ltd 77,042.69 Kinnear Pontiac Buick Ltd. 77,725.45 GMC Truck Centre 78,655.59 Thorncrest Ford Sales Ltd 81,037.70 Res i50 Moved by M.W.H. Biggar Seconded by S.A Macpherson THAT the quotation of Yorkview Ford Sales for the purchase of five new 1983 trucks, in the sum of $74,940 46, including licence and all takes, be accepted; it being the lowest quotation received CARRIED 4 QUOTATION iCLM83-11 -1 New 1983 Three-Furrow Plow The following quotations were received for the supply and delivery of one new 3-furrow plow Edwards Equipment $1,350 00 West Metro Ford 1,500.00 Ken Maynard 1,700 00 Nobleton Farm Service 1,800 00 Don Vallance Equipment 1,850.00 Res i51 Moved by M.W H Biggar Seconded by S.A Macpherson THAT the quotation of Edwards Equipment for the supply and delivery of one new 3-furrow plow, in the sum of $1,350 00, including Federal Sales Tax, be accepted; it being the lowest quotation received CARRIED 5 QUOTATION iCLM83-12 -1 new 1983 Self-Propelled Rotary Lawn Mower The fOllowing quotations were received for the supply and delivery of one new 1983 36" self-propelled mower B-40 -4- Turf Care Products Ltd. $2,925 00 Duke Lawn Equipment 3,200.00 Outdoor Power Equipment 3,300.00 Bannerman Ltd. 3,300.00 Res #52 Moved by: H.C Lawrie Seconded by J.A. Bryson THAT the quotation of Turf Care Products Ltd , for the supply and delivery of one new 36" self-propelled mower, in the sum of $2,925.00, plus Provincial Sales Tax, be accepted; it being the lowest quotation received CARRIED. 6. QUOTATION #CLM83-13 -Rental of Pick-Ups, Vans, and Crew-Cabs Of eleven quotations invited, two were unable to supply pick-ups or crew- cabs, and eight were unable to quote The following quotation was received for the rental of seven pick-ups, six crew-cabs, and one van: SUPPLIER Pick-ups Vans Crew-Cabs Sommerville Car & Trucks Limited $385 00 $385 00 $500.00 inclusive of 7% provincial Sales Tax $45.00/month insurance 1,000 free kilometers/month; excess charge is 10e/kilometer Res ~53 Moved by S.A. Macpherson Seconded by Mrs N. Stoner THAT the quotation of Sommerville Car & Truck Limited for Seven (7) Pick-ups at $385 00 + 7% PST + $45 00 insurance a month; Six (6) Crew-Cabs at $500 00 + 7% P S.T + $45.00 insurance a month; and One (1) Van at $385.00 + 7% PST. + $45 00 insurance a month; which includes 1,000 free kilometers a month, with excess charges at 10e a kilometer, be accepted; this being the only supplier to meet the tender requirements, and being the lowest quotation received CARRIED 7 AUTHORITY FOOD SERVICES -Purchase of Eggs Mr Kolb declared a conflict, and was absent during discussion of and voting on this item Res #54 Moved by Mrs. N Stoner Seconded by: J A Bryson THAT the contract for the purchase of eggs for Authority food services, as required, be awarded to Mrs. Beryle Kolb; AND FURTHER THAT the price be based on the average price paid at other locations. CARRIED. 8 REPORT OF THE STAFF SUB-COMMITTEE ON AMENDMENT OF THE CONSERVATION AUTHORITIES ACT Res #55 Moved by Mrs. L. Hancey Seconded by M.W H. Biggar THAT the report on the "Report of the Staff Committee on the Amendment of the Conservation Authorities Act" be received and forwarded to the Executive Director of the Association of Conservaiton Authorities of Ontario for consideration CARRIED -5- B-41 9 DECISION OF HEARING -Mr Henry Natale Town of Richmond Hill Humber River Watershed Res. #56 Moved by: J S. Scott Seconded by S.A. Macpherson THAT the application of Mr Henry Natale, in accordance with Ontario Regulation 170, for permission to construct a building in an area susceptible to flooding during a Regional Storm, south of the King Sideroad and west of Yonge Street in the Town of Richmond Hill (Humber River watershed), be approved, subject to The applicant submitting to the Authority a more detailed site plan which will show existing and proposed grades, finished floor elevations, and openings to structures, prior to issuance of a permit in accordance with Ontario Regulation 170 CARRIED OTHER BUSINESS 10. Res. #57 Moved by Mrs. N. Stoner Seconded by E. Fulton THAT the Executive Committee consider certain personnel matters in camera CARRIED. ll. Res. ~58 Moved by E. Fulton Seconded by Mrs. N. Stoner THAT the report concerning leave of absence of Mr. K.G. Higgs be received; and the recommendations contained therein, as amended, be approved; THAT the report be signed by the Chairman and the Secretary-Treasurer and filed; AND FURTHER THAT a copy of the report be delivered to Mr Higgs. CARRIED 12. TERMINATION On motion, the meeting terminated 11 30 a.m , March 23 Florence Gell W.E. Jones Chairman Secretary-Treasurer KC ~ , B-42 the metropolitan toronto and region conservation authority minutes REPORT 14/83 EXECUTIVE COMMITTEE 6-APRIL-l983 #4/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 6-April-1983. PRESENT Chairman Mrs.. I!'.E. Gell Vice-Chairman E.V. K01b Members M.W.H. Biggar E. Fulton Mrs'. L. Hancey H.C. Lawrie S.A. Macpherson (For W.G. Barber) L. Martin Ms. S. Nimmo J S. Scott Mrs. N. Stoner ABSENT Member W. G. Barber MINUTES Res. #59 Moved by: t.. Martin Seconded by: H.C'. Lawrie THAT the Minutes of Meeting. #3/83 be approved. CARRIED . CORRESPONDENCE Mr. W.A. McLean,. Acting. General Manager, reported receipt of the following' correspondence:. (a) Letter dated March 16, 1983, from the Metropolitan Toronto Clerk adviSing that. "Prior to preparation of the- 1984-1988 Capital Programme, the General Manager of the' Conservation Authority, the Commissioner of Parks and Property, and the Commissioner of Management Services:-- examine the role and objectives. of conservation prollrammes in Metro, with particular emphasis on waterfront development~ enter into discussionS". wi th the Province' on the issue o~ increased and longer term subsidy commitmentS"; and present a report on: the' above to the- Parks, Recreation and Property Commi ttee ..'" Mr. McLealle informed the, commi ttee- that he. had requested the Administrator" Water Resource Division,. to place thiS" matter on the- agenda of the. Waterfront Advisory Board meetin~' scheduled for April ll, 1983.. (b) Letter dated, March 22',. 1983', from- th8' Borougi't of Scarborough' ~erk concerning' Council. resolution of March- 21,. 1983" that the- Ministry of Natural Resources be requested to. give. high priority and provide- necessary funding assistance. to ensure. early completioO" of the. Authori ty' s. proposed channel. improvemen.ts on. the: Highland Creek. Mr McLean recommended that a. letter be-' forwarded' to the Borough, in acknow.ledqment and appreciation of. their assistance. Res #60 Moved by: M.W.H. Biggar Seconded by: E. Fulton THAT the- report. of the Acting General Manager, together- wi tit correspondence, noted in (a') and: (b) above, be.. recei ved. CARRIED. B-43 -2- CORRESPONDENCE (Contd.) (c) Letter dated March 29, 1983, from Ministry of Natural Resources, advising that the "optional level of delegated authority" has been granted to the M.T.R.C.A., and that a meeting will be convened in the near future concerning the responsibility and accountability to be assumed by the Authority as. a result of the delegated Authority Res. #61 Moved by: Mrs. L. Hancey Seconded by: J.S Scott THAT the Chairman, the Acting General Manager, and the Secretary-Treasurer be authorised to meet with representatives of the Ministry of Natural Resources in connection with the optional level of authority granted by the Ministry to the The Metropolitan Toronto and Region Conservation Authority. CARlU ED . SECTION I ITEMS FOR CONSIDERATION 1. REPORT 11/83 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD Res. #62 Moved by: Mrs N. Stoner Seconded by J.S. Scott THE EXECUTIVE COMMITTEE RECOMMENDS THAT a "Project for Flood Protection Dykes - Duffin Creek, Towns of Pickering/Ajax, The Regional Municipality of Durham - March, 1983", as appended as Schedule "An of these Minutes, be approved; AND FURTHER THAT the following action be taken in connection therewith (a) The Regional Municipality of Durham be designated benefiting mu~icipality on the basis. set forth in the project; (b) The Government of Ontario be requested to approve the project and a grant of 55% of the cost thereof; (c) Pursuant to Section 23 of the Conservation Authorities Act, approval of the Ontario Municipal Board be requested, if required; (d) When approved, the appropriate Authority officials be authorised to take whatever action is required in connection with the project, including the execution of any documents CARRIED SECTION II ITEMS FOR INFORMATION 2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res. '63 Moved by: Mrs. L. Hancey Seconded by: Mrs. N. Stoner THAT the applications listed herein as A(l) t~ A(8) inclusive, be approved, subject to the conditions contained in the reports. CARRIED. A(l) Alfred & Ortrun Piwek To straighten small section of the Miller Creekr south-west corner Concession Line 3 and Harwood Road, Town of Ajax (Duffin Creek Watershed) Subject to All work being completed in accordance with drawings dated March, 1983, prepared for the applicant by The Regional Municipality of Durham, and which shall form part of the permit. , -3- B-44 A(2) George wimpey Canada Ltd To construct storm sewer outfall into Lake Ontario, west of Finely Avenue, Town of Ajax (Waterfront) Subject to (a) All work taking place in accordance with drawings Al-81730-PIO, Al-81730-Gl, and Al-81730-G9, dated July, 1981, by Proctor and Redfern Ltd , which shall form part of the permit; (b) An easement being obtained on behalf of the Town of Ajax for access to Authority lands A(3) Comfort Living Co-op To place fill within regulated area, east side Islington Avenue, 200 metres south of Finch Avenue, Borough of Etobicoke (Humber River Watershed) Subject to All grading being carried out in accordance with the grading plan prepared by Landscape Planning Ltd. and dated February, 1.983 A (4) Mr & Mrs. John Valente To construct addition to dwelling, south of Major Mackenzie Drive, west side Highway #27 (known as #43 Broda Drive), Town of Vaughan (Humber River Watershed) Subject to All work being carried out in accordance with the detailed con- struction drawings which shall form part of the permit A(5) Crimson Maple Tree Inc To excavate and grade parcel of land on east side Albion Road at Armel Court, Borough of Etobicoke (Humber River Watershed) Subject to All grading being carried out in accordance with Drawing U, Site Plan, as prepared by Allan E Jessop, Architect, and dated October 4, 1982 A(6) Mr Brent Orser To construct building south of North Lake Road, east of Yonge Street, Town of Richmond Hill (Humber River Watershed) Subject to All work being done in accordance with the site plan forming part of the permit A(7) Mrs C Petrilli To construct building south of North Lake Road, east of Yonge Street, Town of Richmond Hill (Humber River Watershed) Subject to All work being done in accordance with the grading plan dated May 3, 1979 and prepared by Mitchell & Perry Limited A(8) Parwest Construction Ltd To construct sanitary sewer crossing of the Robinson Creek, south of Langstaff Road, west of Kipling Avenue , Town of Vaughan Subject to All work being carried out in accordance with the plans prepared by Mi tchell , Pound & Braddock Ltd , which wi 11 form part of the permi t B-45 -4- 3 PROJECT FOR EROSION CONTROL & SLOPE STABILIZATION IN METROPOLITAN TORONTO - 1982-1984 -Proposed remedial work at rear of Nos 12-30 Beaucourt Road, Borough of Etobicoke (Mimico Creek Watershed) Res. #64 Moved by Mrs N Stoner Seconded by S.A Macpherson THAT erosion control remedial work be carried out at the rear of Nos 12-30 Beaucourt Road, Borough of Etobicoke, at an estimated cost of $124,500 00; THAT the benefiting owners provide the Authority title to their lands where the main gabion structure is located; AND FURTHER THAT the approval of the Ministry of Natural Resources be requested CARRIED 4 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED -Property The Municipality of Metropolitan Toronto West side Don Valley Parkway, north of Millwood Road, Borough of East York Res #65 Moved by Mrs. L Hancey Seconded by S A Macpherson THAT the report (March 28, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorised and directed to complete the purchase CARRIED "Re Project Land Acquisition Project 1982-1984 - Flood Plain and Conservation Land Component Don River watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property West side Don Valley Parkway, north of Millwood Road Owner The Municipality of Metropolitan Toronto Area to be acquired 29 634 acres~ more or less Recommended purchase price Nominal consideration of $2 00 "Included in the requirements for the above-noted project are two irregularly shaped parcels of land located on the west side of the Don Valley Parkway, north of Millwood Road, being Parts of Lot 11, Concession III, F T B , Part of Allowance for Road between Lots VI and XI, Concession III, F T B , and Part of the Bed of the Don River, Borough of East York (The Municipality of Metropolitan Toronto) "Negotiations have been conducted with officials of The Municipality of Metropolitan Toronto,and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2 06, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive conveyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401 - Flood Control Acquisition " -5- B-46 5 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED -Property Gonte Construction Limited, et al East of Dufferin Street, north of Steeles Avenue, Town of Vaughan Res #66 Moved by Mrs L Hancey Seconded by S A Macpherson THAT the report (March 23, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED "Re Project Land Acquisition Project 1982-1984 - Flood Plain & Conservation Land Component Don River watershed Authority Executive Resolution #88, Meeting H - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property East of Dufferin Street, north of Steeles Avenue , Owner Gonte Construction Limited, et al Area to be acquired 0 174 acres, more or less Recommended purchase price Nominal consideration of $2 00 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being All of Block 84, Plan 65M-2154, Town of Vaughan (The Regional Municipality of York), east of Dufferin Street, north of Steeles Avenue "Negotiations have been conducted with the owner and its solicitor, Mr D.av id J Green, 399 Spadina Avenue, Toronto, Ontario, M5T 2G5 and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal sum of $2.00, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401 - Flood Land Acquisition " 6 TOWN OF AJAX -Request for Authority-owned land north-east corner Elizabeth Street and Highway #2 (Duffin Creek) Res #67 Moved by Mrs N Stoner Seconded by J S Scott WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Town of Ajax to convey a small parcel of Authority-owned land; AND WHEREAS it is the opinion of the Authori ty that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Town of Ajax in this instance; THAT a small parcel of Authority-owned land, containing 0 5 acres, more or less, be conveyed to the Town of Ajax said land being Part of Lot 16, Concession II, Town of Ajax (The Regional Municipality of Durham); con- sideration to be the nominal sum of $2 00, and any other costs involved in completing this transaction; B-47 -6- THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S O. 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorised and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and execution of any documents CARRIED 7 COLONEL SAMUEL SMITH WATERFRONT PROJECT -Controlled Access System Res. #68 Moved by M W H Biggar Seconded by S A. Macpherson THAT staff be authorised to retain the services of C P E. Industries for the supply and installation of a controlled access system for the Colonel Samuel Smith landfill development project, at an estimated cost of $22,981 00 CARRIED , 8. REPORT H/83 - TENDER OPENING SUB-COMMITTEE -Colonel Samuel Smith Waterfront Project - Entrance Road -Humber Bay West Waterfront Project Launching Ramp Parking Lot Res #69 Moved by Mrs N Stoner Seconded by S A Macpherson THAT Report #1/83 of the Tender Opening Sub-Committee and staff reports having regard to (a) Colonel Samuel Smith Waterfront Project Entrance Road and (b) Humber Bay West Waterfront Project Launching Ramp Parking Lot, as appended as Schedule liB" of these Minutes, be received; THAT the tender of Ferpac Paving Inc , in the amount of $54,584 60 for the entrance road paving at Colonel Samuel Smith Waterfront Park be accepted, it being the lowest tender; THAT the tender of Gazzola Paving Limited, in the amount of $100,446 08 for the launching ramp parking lot at Humber Bay West be accepted, it being the lowest tender; AND FURTHER THAT approval of the Province of Ontario be requested CARRIED 9 KORTRIGHT CENTRE FOR CONSERVATION -Proposal & Quotation Theatre Seats The following proposals and quotations have been received for the supply, delivery, and installation of theatre seats at the Kortright Centre for Conservation Price per Chair (includes F S T Deli very and and PST.) Installation Hussey Seating Co Ltd $111 04 13 weeks Irwin Seating Co 120 50 8 weeks Canadian Chair Services Ltd 125 38 4 weeks Res #70 Moved by Mrs L. Hancey Seconded by J S Scott THAT the proposal and quotation of Hussey Seating Co Ltd for the supply, delivery, and installation of theatre seats at the Kortright Centre for Conservation, in the amount of $111 04 per chair (including F S T and PST ) be accepted, it being the most satisfactory proposal and lowest quotation received CARRIED -7- B-48 10 MINISTRY OF NATURAL RESOURCES' AUDIT OF 1980 EXPENDITURE REPORTS Res #71 Moved by Mrs N. Stoner Seconded by S A Macpherson THAT the staff be authorised and directed to issue a cheque to the Treasurer of Ontario in the amount of $86,866 37 as full payment of the Ministry of Natural Resources' audit of this Authority's 1980 Expenditure Reports CARRIED OTHER BUSINESS 11 MATTERS ARISING FROM THE MEETING OF THE BUDGET AND FINANCE SUB-COMMITTEE MEETING #l/83 Res #72 Moved by J S. Scott Seconded by Mrs L. Hancey THAT the Minutes and report of Budget & Finance Sub-Committee Meeting #1/83 be received CARRIED Res. #73 Moved by J S Scott Seconded by Ms S Nimmo THAT, in this instance, and in the interests of keeping our members informed, a copy of the draft Memorandum of Recommendations - 1982 be provided to those members of the Budget & Finance Sub-Committee requesting same, as soon as staff comments have been incorporated in the document CARRIED Motion Moved by Mrs L Hancey Seconded by S A Macpherson THAT the members of the Budget & Finance Sub-Committee be advised that the Accounts Payable printout are available for examination in 1;he Finance & Administration Division THE MOTION WAS ----------------------------------------------- NOT CARRIED Res #74 Moved by J S Scott Seconded by Mrs N Stoner THAT the Accounts Payable printout be provided, on request, to any member of the Authori ty CARRIED 12. TERMINATION On motion, the meeting terminated at 12 30 P m , Apr il 6 Florence Gell W E. Jones Chairman Secretary-Treasurer KC B-49 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY ~ PROJECT FOR FLOOD PROTECTION DYKES - DUFFIN CREEK TOWNS OF PICKERING/AJAX REGIONAL MUNICIPALITY OF DURHAM MARCH, 1983 - E-SO CONTENTS OF BRIEF Page PURPOSE 1 LOCATION AND DESCRIPTION 2 HISTORY OF FLOODING 5 PROPERTY REQUIREMENTS 7 COSTS AND FINANCING 8 APPROVALS 9 , 8-51 - 1 - PURPOSE ~ The purpose of this project is to permit The Metropolitan Toronto and Region Conservation Authority to exercise the powers afforded by The Conservation Authorities Act R S 0 1970. Chap 78 as amended to establish and undertake in the area over which it has jurisdiction. a program designed to further the conservation. restoration, development and management of natural resources in accordance with the Flood Control Program of the Watershed Plan The purpose of this project is to meet one of the defined objectives of the Flood Control Program which is to provide in defined flood damage centres, on a priority basis, protection that will reduce the risk of flooding to less than 50% over the life (100 years) of the affected structure(s) Protection to a higher level will be provided if economically and/or socially justified The achievement of this objective in the Pickering/Ajax Damage Centres will also achieve the goal of the Authority's Flood Control Program which is defined in the Authority's Watershed Plan as "To undertake a comprehensive program of Flood Control Designed to Prevent, Eliminate, or Reduce the Risk of Hazard to Life and Property, while cognizant of the Natural Attributes of the Valley System " Through this project, the Metropolitan Toronto and Region Conservation Authority will implement dyking along the Main and West branches of the Duffin Creek through the Towns of Pickering and Ajax The completion of the dyking works will reduce considerably the risk of flood hazard to the communities This project will be undertaken in accordance with the requirements of The Environmental Assessment Act B-52 - 2 - LOCATION AND DESCRIPTION In the development of the Flood Control Program for the Watershed Plan, the Authority identified those areas of development concentrations within the floodplain which formed integral parts of existing communities These areas were defined as Damage Centres and inherent in this definition is a susceptibility to flooding to the extent where potential damages and community disruption are significant Based on a ranking of such factors as expected damage. threat to life, disruption of transportation routes, etc , the Damage Centres were ranked on a priority basis in order that the Authority could achieve its objective of providing flood protective works to these flood vulnerable areas in a sequence based on degree of hazard In this regard, the Authority identified the Pickering/Ajax area as a Damage Centre and ranked it 4th out of 14 sites This relatively high ranking is due to the frequency of flooding and the potential for more severe flooding The proposed works to be carried out in accordance with this project will involve the floodplains of both the Main and West Branches of the Duffin Creek through the Towns of Pickering and Ajax (Fig 1) A substantial amount of development in both Pickering and Ajax is located within the floodplain of the Duffin Creek This development is primarily the older established portion of the communities which as in most other communities historically located next to the rivers for power, navigation and water supply The river at this point flows through a large ill-defined valley. with wide flat overbanks These overbank areas are susceptible to flooding on an almost annual basis A detailed description of the flood history of this area is provided in the next section entitled History of Flooding The limits of the Pickering/Ajax Damage Centres were identified on the basis of the area which would be flooded by the Regional Storm as per Fig 2 In accordance with the Authority's stated objective of providing at least a minimum level of protection to those Damage Centres which had a risk of flooding greater than 50% over an assumed life of 100 years, those areas which do not meet this criterion are located within the 1 150 year flood line as shown on Fig 3 The preliminary engineering study carried out to study the flooding problem recommended a solution to provide this minimum level of protection and also recommended that a higher level of protection could be justified This higher level would reduce the risk of flooding to 18% or protection to the 1 500 year flood event The areas flooded by the 500 year flood event is shown on Fig 4 These recommendations were based on an analysis of the costs and benefits associated with the proposed works A summary of the damages associated with various flood frequencies is provided in Table I ~ B-53 I I I ;n I <' I '" ;n I (J) 0 I '" I TOWN I c OF I ;n I AJAX '" I ;n 0 I (") " I ;n I " I I I I I /--........ I / --, I \ \ , \ , I I I KINGSTON RD (HWY No.2) I I I I (") I :I: C I ;n 2 TOWN I I OF I ~ PICKERING I I I I ~ I I I I I I I HWY. No. 401 I I I I I I I I I ~ the metropolitan toronto and regIon FIGURE 1 , conservation authority - J }' r,:) (/ ,'" \ . .' , \ \ . \ J \ ~" - ., \ . /",/-\ I' "" <; V~ . \ \ . . \ \ ,us , .010 0 ~ ~ . \ ,'"'-. ,~ '. I) \ ~ . ' ~ the metropolitan toronto and region LOCATION OF STUDY AREA FIGURE Z Ol conservation authority I IJ\ ~ tP I 1J1 j ) t \\ 1J1 \ I\- "'0 ~/./ I\. \\ \ \ " . ' \\ r ,r ' "-.:\ -,-~ \ . \ \ \ '" '. . /' -/""... \ <- I'", \ <: v--\ . , , . . \ \ \ , \ \ 10' 0 0 ~ . . , ~ . ~ AREAS SUSCEPTIBLE TO fLOODING 11)O 'tEAR fLOOO -'- fiGURE 3 the metropolitan toronto and region BELOW MoT.R.C.A MINIMUM CRITERIA , conservation authority - - } )' . .. I .. ":) ~/,/ \\ \ " . 'II i \ ' \\ " "-:."..--..J \ \\ . 'II \ ~ , r.. " \ . .../"- . ,/ , \ ~ ,,~ << ~ . \ '. . . \ \ I ... , \ 1010 ., ~ ~ . . C" " . . ')' . I . ' .....Ioe metrOPOlllan loronlO and region AREAS SUSCEPTIBLE TO FLOODING . 500 '(EAR fLOOD BELOW M.T.R.C A. MINIMUM CRITERIA LINE ....... fiGURE 4 f/ conservation aUlhOrity Ol 1 VI Q'\ -. 8-57 - 3 - TABLE 1 PICKERING/AJAX DAMAGE CENTRES SUMMARY TABLE Risk of Flooding Return over 100 Commer- Resi- Depth of Period year life cial dential Total Flooding Damage $ Value $ Annually 100% 2 7 9 0-0 3m 10,515 - 25 yr 98% 3 9 12 0-0 3m 70,300 - 100 yr 63% 5 17 22 0-0 8m 165,000 - 150 yr 49% 5 18 23 0-1 Om 206,700 1,217,000 350 yr 25% 5 25 30 0-1 5m 396,500 1,512,000 500 yr 18% 5 27 32 0-1 5m 420,825 1,607,000 Regional - 37 71 108 0-4 Om 10,581,700 22,760,000 The damages estimated in Table 1 represent only the tangible losses and do not include such intangibles as lost revenues, human suffering and inconvenience, loss of life, etc The "Value" figure represents an estimated net worth of the properties affected Based on this information, the present value of the average annual damages was determined to be $175,000 utilizing a 6% discount rate Again this represents only the pr~sent worth of the tangible costs The most economically viable and environmentally acceptable solution to achieving the minimum level of protection is the construction of 2 dykes located as shown on Figure 5 Due to the wide flat overbanks described earlier there is a relatively small difference between the 1 150 year flood event and the 1 500 flood As a result, the additional cost for providing the 500 year protection is very small The estimated additional cost is estimated to be only $25,000 and therefore, the alternative of providing 500 year protection is recommended The total estimated cost for the recommended alternative is $350,000 Although this cost compared to the present value of the damages gives a cost/benefit ratio of 0 5, it is expected that if the intangible benefits were able to be costed that a more favourable cost/benefit ratio could be obtained A summary of the intangible costs is provided below ~ /- \ . ( ~ ~ '" -~\ \ \ . ..s - DYKE LOCATION .... t:ll 500 yEAR FLOOD LINE ........... FIGURE 5 I U1 0:> B-59 - 4 - Although it is always difficult to assign dollar values to the intangible items, it is important that they be considered Items which are included as intangibles are the social disruption to the Pickering/Ajax communities, road closures causing traffic disruptions and the hampering of emergency vehicular traffic, damages to municipal services such as water supply and sewers resulting in public health problems, evacuation of local residents and the threat to loss of life Since flooding of this area occurs on an almost annual basis, the intangible costs are significant The need for the municipality to continue to pump out basements once or twice a year plus the inconvenience to the residents represents a considerable expense Also the lost revenues by the commercial properties and the potential loss of future business and good will must be considered when attempting to define the more intangible affects associated with flooding In this regard, the recommendation to provide 500 year flood protection to the Pickering/Ajax Damage Centres is deemed to be appropriate and justified The relatively small cost for remedial works which provide such a high level of protection is certainly warranted The components of the remedial works required to provide 500 year protection is the same as that shown on Figure 5 The additional costs are for a slight increase in the height of the berms The dyke proposed to provide protection to the flood susceptible area north of Highway No 2 runs from Brock Road along the West and Main Branches of the Duffin Creek and ties into the highway west of the Duffin Creek Highway No 2 bridge The second dyke will provide protection to the flood susceptible area along Church Street north of the Church Street bridge The dyke will begin at the west side of Church Street north of the Creek and tie into a high point of land to the north-west of the study area The proposed dykes have been layed out along locations where the least amount of disturbance to the existing environment would occur and also where the impact upon private properties has been minimized The dykes were also located in order to allow the river system to utilize the maximum amount of existing floodplain wherever possible The internal drainage within the areas to be protected by the dykes will be carried out through the construction of drainage structures (culverts) with one way flow gates to ensure against backwater flow into the protected areas A typical cross-section4of the proposed dykes is shown on Figure 6 . . DUFFIN CREEK lJ:J I (n 0 - ~ the metropolitan toronto and region CROSS SECTION OF DYKE AND FLOOD PLAIN FIG. 6 V conservation authority 8-61 - 5 - HISTORY OF FLOODING Flooding of the Duffin Creek in the pickering/Ajax Damage Centres has been recorded as early as 1886 For the period between 1886 and 1982 this area has flooded at least 32 times The majority of the flooding occurs in the spring time both as a result of high flows and ice jamming A chronological list of the recorded floods for the Pickering area follows Detailed accounts of the flooding are not available for the majority of the flood occurrances More information however is available for the more recent events This information indicates that flooding can last from 6 hours to 2 1/2 days On several of these occasions the municipality was required to provide assistance to the residents in the form of basement pump outs, evacuation of residents and culvert cleanout Flooding in this area h~s become an almost annual event It is for this reason plus the susceptibility to more severe flooding that the Authority rated this area number 4 on its priority list of 14 Damage Centres requiring remedial work The following photographs illustrate the flooding problem in this area as well as depicting the type of development located within the Damage Centre DUFFIN CREEK FLOOD HISTORY PICKERING VILLAGE The following floods have been reported 1886, March 2 - caused by spring melt - parts of village flooded 1890, June 5 - caused by heavy rains and thunderstorms of previous two days - local bridges damaged - telegraph lines down - cellars flooded - roads washed out, some livestock lost 1936, March 11 - caused by spring melt plus rain - roads flooded and damaged 1942, March 9 & 17 - caused by ice jams - roads blocked and damaged 1948, March 16 - Hwy 2 flooded 6 inches deep 1949, February 15 - roads blocked and damaged 1950, January 26, - a series of floods aggravated March 25-26, by ice-jams Apri 1 4 - damage to roads and houses 1951, April 12 - roads flooded B-62 - 6 - 1951, July 16 - caused by heavy rain - roads flooded 1952, February 4, - roads flooded March 11 1953, February 21 - caused by ice-jam - roads and one home flooded 1953, March 4 - Hwy 2 flooded 1954, February 15 - roads flooded 1954, February 21 - Hwy 2 flooded October 15-16 - Local roads flooded (Hurricane Hazel) - at least one family forced out 1955, March 1 - Hwy 2 flooded 2 feet deep at Church Street 1956, March 7 - caused by ice-jam - ice chunks and water on Riverside Drive, 12 families evacuated - Hwy 2 and nearby houses flooded 1959, April 2 - Hwy 2 flooded briefly 1959, April 8 - caused by ice-jams - Riverside Drive, Hwy 2 flooded to about 2 inches deep - 2 families evacuated 1960, March 28-31 - Hwy 2 at Church Street flooded 6 inches to 1 foot deep 1960, April 2-3 - Hwy 2 flooded and closed briefly 1961, February 23 - footbridge over a tributary washed out near Riverside Drive, one couple temporarily stranded at a cottage 1979, December 25 - flooding north of Hwy 2 - flooding along Church Street 1980, March 21 - flooding north of Hwy 2 - flooding along Church Street 1981, February 18-21 - duration 2 1/2 days, 2 separate events - flooding - Hwy 2 - north - Church Street - Fire Department (Pickering) called to help in residence completely innundated 1982, March 31 - April 1 - flood north of Hwy 2 and by Church Street - several residences completely innundated - M T C out to unclog culverts - offered to evacuate Not undertaken 8-63 , FLOOD OF MARCH 1981 t~~. 'I r'o ~ _~I , I I , ; .~ ;t./ t. ~, . :.t i -~ ~ --- "':_&, , i, '\ .,.l:~ FLOODING OF RESIDENCE NORTH OF HWY ~2, SOUTH OF DUFFIN CREEK IN PICKERING . \ '" , ~. , I ~ ,~- .- ~~:'.L ~~~ .~~ l FLOODING OF MOTEL NORTH OF HWY ~2, WEST OF DUFFIN CREEK IN AJAX 8-64 - 7 - PROPERTY REQUIREMENTS Since the major amount of property required for this project is presently owned by this Authority, only a small amount of additional properties will be required These properties if required will be acquired under the Land Acquisition Project 1982-1984 of the Watershed Plan and therefore will not form part of this project , , B-65 - 8 - COSTS AND FINANCING The expenditures required to implement this project shall be understood to include engineering and geotechnical studies, site supervision, environmental assessment and all materials, labour, equipment, etc associated with the construction Costs Highway No 2 to Activity Church Street Dyke Brock Road Dyke Mobili~ation/Demobilization $ 3,500 $ 9,000 Cleaning & Grubbing $ 5,000 $ 9,000 Stripping & Storing Topsoil $ 2,800 $ 4,500 Importing & placing material $ 47,800 $ 68,100 Replacing Topsoil $ 6,000 $ 13,500 Seeding, Sodding & Mulching $ 7,500 $ 15,500 Restoration $ 2,000 $ 5,000 Drainage Structures $ 10,000 $ 40,500 Bonds & Insurance, Engineering, Legal, Inflation & Contingency Allowance $ 40,400 $ 59,900 Total $125,000 $225,000 Project Total $350,000 Financing This project will be funded as follows 1984 Province of Ontario $192,500 Authority $157,500 $350,000 The Regional Municipality of Durham is designated as the benefiting municipality to raise the Authority's share of the cost of the work being 45% of the total 6-66 SCHEDULE "B" ~PO:RT H/83 TENDE:R OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Thursday, March 31, 1983, commencing at 2 00 p m to open the following tenders 1 Entrance Road Paving, Colonel Samuel Bois Smith Waterfront Area 2 Launching Ramp Parking, Humber Bay West Waterfront Area PRESENT WERE Chairman Mrs F Ge11 Johnson, Sustronk Weinstein + Associates, Consulting Engineers H Sustronk Staff C Mather B Denney N Cowey The Committee was advised that thirteen tenders for the Colonel Samuel Bois Smith contract and fifteen tenders for the Humber Bay West contract were received as follows COLONEL SAMUEL BOIS SMITH :# - Entrance Road Paving Contractor Amount 1 Empire Paving Ltd $53,195 20 2 Ferpac Paving inc $54,584 60 3 Maple Earthmoving (227223 Ltd ) $55,568 00 4 Dominion Paving Ltd $56,022 07 5 Sentinel Paving & Const $57,629 65 6 Warren Bitulithic Ltd $57,853 30 7 D Crupi & Sons $58,658 00 8 Gazzola Paving Ltd $61,721 45 9 Dufferin Construction $63,814 50 10 Andrew Paving $64,658 00 11 Fermar Paving Ltd $67,040 50 12 Bray Construction $72,232 50 13 Armbro Holdings Limited $78,126 04 /2 B-67 - 2 - HUMBER BAY WEST - Launching. Ramp pa.rking Contractor Amount 1 Gazzola Paving Limited $100,446 00 2 Sentinel Paving & Const $101,~42 00 3 Ontario Paving Limited $102,584.50 4 Fermar Paving Limited $102,609 50 5 Empire Paving Limited $103,982 00 6 Maple Earthmoving (227223 Ltd ) $104,238 50 7 D Crupi & Sons $106,106 00 8 Dominion Paving Limited $107,980 50 9 Ferpac Paving Inc $114,762 00 10 Dufferin Construction $115,132 50 11 Pel tar Paving $116,704 00 12 Andrew Paving $120,151 50 13 Warren Bitulithic Ltd $130,845 96 14 Armbro Holdings Limited $134,404 10 15 G & G Paving & Concrete Ltd $138,465 00 IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT The three lowest tenders received for the Colonel Samuel Bois Smith entrance road paving and Humber Bay West 1aunening ramp parking be submitted to the Consultants for their review and report, with recommendations to be presented to the Executive Committee at their meeting to be held on Wednesday, April 6, 1983 Mrs F Ge11 W E Jones Cha~rman Secretary-Treasurer 1983 04 05 NC/md B-68 TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA - Mtg #4/83 FROM MR J C MATHER, ADMINISTRATOR - WATER RESOURCE DIVISION RE COLONEL SAMUEL BOIS SMITH WATERFRONT PROJECT - ENTRANCE ROAD PAVING The Tender Opening Sub-Committee met on Thursday, March 31, 1983 at which time the following recommendation was adopted "IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT The three lowest tenders received for the Colonel Samuel Bois Smith Entrance Road Paving be submitted to the Consultants for their review and report, with recommendations to be presented to the Executive Committee at their meeting to be held on Wedpesday, April 6, 1983 " Mr H Sustronk has completed his review of the three lowest tenders and submits the following report "A total of 13 tenders for this project were received by you on Thursday, March 31, 1983 Based on the tender values entered by the tenderers, the three lowest tenders were Empire Paving Limited $53,195 20 Ferpac Paving Inc $54,584 60 227223 Earthmoving Limited $55,568 00 Our estimate for this contract was ~ $60,000 00 The three lowest tenders were checked by us for errors and omissions in the Form of Tender No errors were found in the tenders submitted by 227223 Earthmoving Limited and Ferpac , Paving Inc A number of errors were found in the tender submitted by Empire Paving Limited primarily in the extension of unit prices (Tender Items 18, 19, 22 and 23) As a result, the actual tender value of Empire Paving Limited increased to $56,544 30 Thus, instead of being the lowest tender submitted, it is actually the fourth lowest tender received by you Thus, the tender submitted by Ferpac Paving Inc , in the amount of $54,584 60 is the lowest tender received by you Ferpac Paving Inc , has been in business for seven years and mostly works for municipalities Based on the above, we recommend that this contract is awarded to Ferpac Paving Inc " RECOMMENDATIONS IT IS RECOMMENDED THAT The tender of Ferpac Paving Inc in the amount of $54,584 60 for the Entrance Road Paving at Colonel Samuel Bois Smith Waterfront Park be accepted, it being the lowest tender; and THAT the approval of the Province of Ontario be requested 1983 04 05 NClfs B-69 TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA - Meeting H/83 FROM MR J C MATHER, ADMINISTRATOR, WATER RESOURCE DIVISION RE HUMBER BAY WEST WATERFRONT PROJECT - Launching Ramp Parting. L.o.t The Tender Opening Sub-Committee met on March 31, 1983, at which time the following recommendation was adopted "IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT The three lowest tenders received for the Humber Bay West launching ramp parking be submitted to the Consultants for their review and report, with recommendations to be presented to the Executive Committee at their meeting to be held on Wednesday, April 6, 1983 " Mr H Sustronk has completed his review of the three lowest tenders and submits the following report "A total of 15 tenders were received by you for this project and opened Thursday, March 31, 1983 Based on the tender values entered by the Tenderers, the lowest tenders were Gazzola Paving Limited $100,446 00 Sentinel Paving & Const $101,142 00 Ontario Paving C $102,584 50 Our estimate for this contract was ~ $106,000 00 In the Form of Tender, Tender Item No 8 was listed twice In accordance with the Information to Tenderers the tender was in such an instance required to complete Tender Item 8 in both instances and include for this in their tender Both Sentinel Paving and Gazzola Paving did this, Ontario Paving did not As a result, the tender submitted by Ontario Paving increases to $105,334 50, other than this no errors were found in the three lowest tenders The low Tenderer, Gazzola Paving Limited, has a good reputation and we recommend that they be awarded the contract n RECOMMENDATIONS IT IS RECOMMENDED THAT The tender of Gazzola Paving Limited in the amount of $100,446 08 for the Launching Ramp Parking Lot at Humber Bay West be accepted, it being the lowest tender; AND THAT the approval of the Province of Ontario be requested 1983 04 05 NClmd ~ , B-70 !, the metropolitan toronto and region- conservation authority minutes ~J:!l)nQ"" !C\/R1 EXECUTIVE COMMITTEE 20-APRII.-1983 '5/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,- on Wednesday, 20-Apr il-198 3. PRESENT Chairman Mrs. F.E. Gell Members W.G. Barber M.W.H. Biggar Mrs. tr. Hancey (E'or J..S. Scott) W.R. Herridge, Q.C. H.C. trawrie: S.A. Macpherson (For E. Fulton) W. G. Mctrean Ms-. S. Nimmo Mrs. N. Stoner ABSENT Vice-Chairman E.V. Kolb Members E. Fulton J.S., Scott MINUTES Res. t75 Moved, by: H.C., Gawrie- Seconded by: W.G. Barber THAT the Minutes. of Meeting H/83 be- approved. CARRIED . CORRESPONOENCE Mr. W.A. Mctrean, Acting General. Manager, reported receipt of the' following correspondence: (a) Copy of letter dated April S, 1983, from the- Minister- of NaturaL Resources in response to resolution of Scarboroug~ Council (as reported to Executive Committee Meeting '4/83) that the Ministry give high priority to the Authori ty I S proposed Highland Creek channe-l improvements:. The, Minister's reply indicated .... "While r understand the concerns of council, I think it is- important that they' appreciate the' difficult- task in allocatincr a limi tad amount of provincial fundin9 to an increasinq number of Conser.vation' Authority projects-... ~.. .'.'. ..., and r can assur8' you, the-- Highland Creek Pro-ject will be given due consid'e-ratioa in. the event addi tional funding', becomes: available. If' (b) tretter' dated April 7, 1983, from'- thEl' lotinister of: Natura-I. Resources to the- Chairmen of the-- Ontar io Conse-rvation Authori ties, advis-ing.- that .... "I have received numerous- requests to clarify the-- rolEt' of my Ministry vis-a-vis that of the Conservation' Authorities: in th'&- plan', rev.iew process., specifically where: it relatea'to, flood. plain' management issues'. . .. r have- decided that in future- the Conservation Authoritie-s, where- they exist,. should be the-< so'le' commenting: agenc.ies' on' flood,'pla,in management matters n - ....'... Res. H6 Moved by: M.W.f{. Biggar Seconded by: Mrs. L.- Hancey- THAT the letter dated April. 7, 1983, received from' the Minister of Natural Resources, having regard to the- Minister_' s decision that Conservation Authorlties shall be, the sole commenting' agencies: on flood plain management matters, in the plan review process-, be received; . B-71 -2- AND FURTHER THAT staff be directed to refer the Minister's letter to the Authority solicitor for comment and to report to the Executive Committee upon receipt of the solicitor's response. CARRIED. (c) Letter, dated April 19, 1983, directed to the Executive Committee by Alderman John Sewell, dealing with matters of Authority organization It was agreed that this letter be considered in conjunction with certain personnel matters scheduled later on the agenda. SECTION I ITEMS FOR CONSIDERATION 1. REPORT #1/83 - WATERFRONT ADVISORY BOARD Res. #77 Moved by: W.G. McLean Seconded by Mrs. N. Stoner THAT Report #1/83 of the Waterfront Advisory Board be received; AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #1, #2, and *3, as set forth herein, be approved; II (a) The Ministry of Natural Resources be requested to give early approval to an extension of the Waterfront Development Project for 1984, involving a provincial cash flow allocation of $1,100,000 00; (b) The Ontario Municipal Board be requested to approve the Project, pursuant to Section 23 of the Conservation Authorities Act; (c) When approved, the appropriate Authority officials be authorised to take whatever action is required in connection with the project, including the execution of any documents. II The Shoreline Management Project 1984-1986, as appended as Schedule "A" of these Minutes, be adopted; And Further That the following action be taken in connection therewith (a) The Municipality of Metropolitan Toronto be designated as the benefiting municipality on the basis set forth in the proj ect; (b) The Government of the Province of Ontario be requested to approve the project and a grant of 55% of the cost; (c) The Ontario Municipal Board be requested to approve the project pursuant to Section 23 of the Conservation Authorities Act; (d) When approved, the appropriate Authority officials be authorised to take whatever action is required in connection with the project, including the execution of any necessary documents. t3 The Bellamy Road Ravine Erosion Control Project, as appended as Schedule "B" of these ~inutes, be adopted; AND FURTHER THAT the fo'llowing action be taken in connection therewi th (a) The Municipality of Metropolitan Toronto be designated as the benefiting municipality on the basis set forth in the proj ect; (b) The Government of the Province of Ontario be requested to approve. the project and a grant of 55% of the cost; (c) The Ontario Municipal Board be requested to approve the project pursuant to Section 23 of the Conservation Authorities Act; (d) When approved, the appropriate Authority officials be authorised to take whatever action is required in connection with the project, including the execution of any necessary documents; -3- B-72 (e) Subject to the receipt of provincial and municipal approvals, the staff be directed to prepare development agreements with the agencies involved regarding the details of additional design studies, property acquisition, tendering, construction supervision, financial and other arrangements; (f) No work proceed until the owners of property south of the tunnel intake shaft have agreed to deed the land below the top of slope to the Authority; AND FURTHER THAT staff report back to the Waterfront Advisory Board during 1983 if difficulties are encountered in negotiations with property owners in connection with the Bellamy Road Ravine Erosion Control Project; (g) The Borough of Scarborough be requested to enact ravine protection legislation CARRIED SECTION II ITEMS FOR INFORMATION 2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res 178 Moved by M W H Biggar Seconded by Mrs L. Hancey THAT the applications listed herein as A(l) to A(8) inclusive, be approved, subject to the conditions contained in the reports CARRIED A(l) Borough of Scarborough To construct bank stabillization works to protect sanitary manhole rear of 138 Stansbury Crescent (Highland Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Two drawings (plan view and cross-section) prepared by the applicant A(2) philmor Developments (Harwood Chase) Ltd To re-align small watercourse east of Monarch Avenue, south of Clements Road, Town of Ajax (Waterfront) In accordance with the following documents and plans, which shall form part of the permit Drawings Al-79563 - Gl, G4, G5, and P8, up-dated February 1983 by Bunting Wardman Limited A(3) Borough of Scarborough To construct culvert under proposed Lawrence Avenue Extension at access to West Rouge Pumping Station and under C N R , together with outlet channel from culvert to Lake Ontario Shoreline In accordance with the following documents and plans, which shall form part of the permit (a) Drawings 1, 2, 3, and 9, dated March 1983, prepared by Chisholm, Fleming & Associates; (b) Special provisions 22, 23, 24, and 25, dealing with drainage-related works B-73 -4- A(4) Mr Francisco Costa To construct retaining structures rear of #28 Hillside Avenue, Town of Vaughan (Don River Watershed) In accordance with the following documents and plans, which form part of the permit The detailed plans submitted with the application A(5) Mr Jose Gabriel To replace garage at rear of #36 Bonnyview Drive, and construct cold storage room, Borough of Etobicoke (Mimico Creek Watershed) In accordance with the following documents and plans, which form part of the permit The plot plan and sections submitted with the application. A(6) Red Cedar Investments Ltd To place fill within regulated area and alter existing channel of a watercourse, north of Woodbridge Avenue, west of Clarence Street, village of Woodbridge (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Grading and Storm Sewer Outfall Drawings Nos 2, 3, and 7, Project 230-E-80, prepared by Anton Kikas Ltd and dated November 1982 A(7) Mr E Weidner To construct gabion retaining wall and re-shape rear slope at #165 Verobeach Blvd , City of North York (Humber River Watershed) In accordance with the following documents and plans, which form part of the permit The plans prepared by ~iggins Consulting Engineers and Planners, dated March 24, 1983 A(8) Brampton Brick Limited To alter section of the Etobicoke Creek, east of Main Street, south of Highway #7, City of Brampton In accordance with the following documents and plans, which shall form part of the permit The "Design Report for Turbidity Reduction System", dated April 1983, and the site plan dated AprilS, 1983, prepared by R J Long, Consulting Limited 3 Land Acquisition Project 1982-1984 Humber River Watershed -Property Gordon & Beryl Goodfellow North side Mill Street, Bolton Res t79 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the report (April 8, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED. "Re Project Land Acquisition Project 1982-1984 _ Flood Plain & Conservation Land Component Humber River watershed B-74 -5- Authori ty Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property North side Mill Street, Bolton Owner Gordon & Beryl Goodfellow Area to be acquired a) o 030 acres, more or less - purchase b) o 015 acres more or less - permanent easement c) o 030 acres, more or less - temporary easement Recommended purchase price $9,000.00, plus vendors' legal costs and construction of suitable fencing. "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residential property, being Part of Lots 37 and 'C' , Gardhouse Estate, Plan BOL-9, Town of Caledon formerly Village of Bolton (The Regional Municipality of Peel) This land is required for the Bolton channelization works This transaction also includes the acquisition of a permanent easement for maintenance of the flood control works, and a temporary easement for a period of approximately eight months to facilitate construction. "The residence situate on this property is extremely close to the work area Negotiations have been conducted with the owners and their solici tor, Mrs Jean Carberry, 4 Queen Street North, Bolton, Ontario, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $9,000 00, plus vendors' legal costs and the construction of suitable fencing The purchase also includes payment in full for the permanent and temporary easements, and any disturbance resulting from the construction "I recommend approval of this purchase, and that the legal fi rm 0 f Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401 " 4 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property Elsa Goodfellow North side King Street, Bolton Res #80 Moved by Mrs L Hancey Seconded by M W.H Biggar THAT the report (April 8, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the pu'rchase CARRIED "Re Project Land Acquisition project 1982-1984 Flood Plain & Conservation Land Component - Humber River Watershed Authority Executive Resolution #88, Meeting #4 - April 8 , 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property North side King Street, Bolton Owner Elsa Goodfellow B-75 -6- Area to me acquired a) 0 07 acres, more or less - purchase b) 0 01 acres, more or less - permanent easement c) 0 02 acres, more or less - temporary easement Recommended purchase price $5,000 00, plus vendor's legal costs and the construction of suitable fencing "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residential property, being Part of Lots 39 and 'C', Gardhouse Estate, Plan BOL-9, Town of Caledon, formerly Village of Bolton (The Regional Municipality of Peel) This land is required for the Bolton channelization works This transaction also includes the acquisition of a permanent easement for maintenance of the flood control works, and a temporary easement for a period of approximately eight months to facilitate construction "Negotiations have been conducted with the owner and her sOlicitor, Mr A.D McFall, 200 University Avenue, Toronto, Ontar~o, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $5,000 00, plus vendor's legal costs and the construction of suitable fencing The purchase also includes payment in full for the permanent land, and temporary easements, and any disturbance resulting from the construction "I recommend approval of this purchase and that the legal firm Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive conveyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition in Account 0-04-11-401 " 5 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property Myron & Emily Blozowski South of Rowntree Mill Road, west of Islington Avenue, City of North York Res #81 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the report (April 13, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED "Re Project Land Acquisition Project 1982-1984 Flood Plain and Conservation Land Component _ Humber River Watershed Authority Executive Resolution #88, Meeting #4 _ April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property South of Rowntree Mill Road Owners Myron & Emily Blozowski Area to be acquired 0 680 acres, more or less , Recommended purchase price Nominal consideration of $1 00, plus vendors' legal costs "Included in the requirements for the above-noted project is a rectangularly-shaped parcel of land, being a partial taking of a larger property, located south of Rowntree Mill Road, west of Islington Avenue "Negotiations have been conducted with the owner, and, subject to the approval of your Committee, agreement has been reached with respect to a -7- B-76 purchase price, as follows The purchase price is to be the nominal consideration of $1 00, plus vendors' legal costs, with date of completing the trans- action to be as soon as possible. "I recommend approval of this purchase, and that the legal firm Gardiner, Roberts be instructed to complete the purchase. All reason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive conveyance of the land required free from encumbrance "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-11-401." 6. THE REGIONAL MUNICIPALITY OF DURHAM -Request for Authority-owned land Bayly Street, between Valley Road and Church Street, Ajax (Duffin Creek) Res #82 Moved by Mrs. L Hancey Seconded by M W H. Biggar WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from The Regional Municipality of Durham to convey a small parcel of Authority-owned land required to facilitate the widen- ing of Bayly Road; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with The Regional Municipality of Durham in this instance; THAT a parcel of Authority-owned land, containing 0 244 acres, more or less, be conveyed to The Regional Municipality of Durham for the widening of Bayly Street between Valley Road and Church Street; said land being Part Lot 13, Range 3, Broken Front Concession, Town of Ajax (The Regional Municipality of Durham), designated as Parts 1 and 2 on Plan 40R-7426 Consideration to be the nominal sum of $2..00, with the Region being res- ponsible for all legal, survey, and other costs; THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and execution of any documents. CARRIED 7. 1983 AIR PHOTO (STEREO PAIRS) PROGRAMME Res #83 Moved by Mrs. L Hancey Seconded by H C Lawrie THAT the firm of Kenting Earth Sciences Limited be retained to carry out aerial photography for the Authority's area of jurisdiction, at a cost not to exceed $18,400.00, plus appropriate Federal and Provincial sales taxes; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto. CARRIED. 8 KEATING CHANNEL ENVIRONMENTAL ASSESSMENT Res #84 Moved by: M.W.H. Biggar Seconded by H.C. Lawrie THAT the staff report, together with the Keating Channel Environmental Assessment report dated March 1983, as prepared by Acres Consulting Services Limi ted, be received; THAT the Keating Channel Environmental Assessment report dated March 1983 be approved, subject to the provisions of The Environmental Assessment Act; AND FURTHER THAT the following action be taken B-77 -8- (a) the Assessment be submitted to the Ministry of Natural Resources and The Municipality of Metropolitan Toronto for approval, subject to the provisions of The Environmental Assessment Act; (b) subject to the receipt of the conditional approvals noted in (a) above, that the Keating Channel Environmental Assessment be sub- mitted to the Minister of the Environment for approval under the Environmental Assessment Act; CARRIED The Chairman expressed sincere appreciation to Dr Ian Hill, Senior Scientific Specialist with Acres Consulting Services Limited in Niagara Falls and Project Manager for the Keating Channel Environmental Assessment, for the exceptional efforts of the many staff members involved in the production of their excellent report 9. REPORT H/83 - WATERFRONT ADVISORY BOARD Res #85 Moved by: W.G. McLean Seconded by Mrs. N Stoner THAT Report tl/83 of the Waterfront Advisory Board be received; AND FURTHER THAT Recommendation 14, as contained therein and set forth herein, be adopted !! The Terms of Reference for the Aquatic Park Planning Task Force be approved, subject to the comments of the Task Force CARRIED. 10 KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme progr amme Wind Energy Monitoring System The following quotations have been received for the above-noted equipment Pate Instruments $1,720.00 Aeolian Kinetics 2,105.00 Second Wind Inc 2,156.00 Natural Power Inc. 2,310 00. Res. t86 Moved by Mrs. L Hancey Seconded by Mrs. N. Stoner THAT the quotation received from Pate Instruments for wind energy monitoring equipment for the Kortright Centre for Conservation Renewable Energy Theme programme, in the amount of $1,720 00 (plus P.S.T. and F S. T ), be accepted, it being the lowest quotation received. CARRIED 11 BICENTENNIAL PROJECT Res. t87 Moved by M W H. Biggar Seconded by: Mrs. L. Hancey THAT the Authority designate the Black Creek Pioneer Village Visitor Centre as its contribution to the Bicentennial of the province of Ontario in 1984 CARRIED. 12 REPORT H/83 - R.D.H P ADVISORY BOARD Res. t88 Moved by Mrs. N. Stoner Seconded by H.C Lawrie THAT Report tl/83 of the R D.H P Advisory Board be received; AND FURTHER THAT the recommendations contained therein, and set forth herein, be approved n Until such time as matters dealing with re-organization are considered, the name "Carruthers Creek" be added to the name of the Board and that it be referred to as the- R.D.H P.C. Advisory Board. -9- B-78 .E The Executive Committee authorise the staff to poll community interest groups within the R 0 H.P C watersheds to determine their interest in receiving agendas and meeting information for this Board, and in being involved in its activities. CARRIED 13 FINANCIAL REPORT AND ACCOUNTS FOR THE PERIOD JANUARY I-MARCH 31, 1983 Res #89 Moved by Mrs. L. Hancey Seconded by Mrs N. Stoner THAT the Divisional Expenditure Summary for the period January 1, 1983, to March 31, 1983, as appended as Schedule "C" of these Minutes, be received; AND FURTHER THAT payment of the Authority accounts, in the amount of $3,132,706 00, be approved. CARRIED. 14. REPORT #1/83 - RECOGNITION SUB-COMMITTEE Res #90 Moved by Mrs. L. Hancey Seconded by S A. Macpherson THAT Report #1/83 of the Recognition Sub-Committee be received; AND FURTHER THAT the recommendations contained therein, and set forth herein, be approved !!. the 1983 Honour Roll Awards tree planting ceremony be held on Friday, May 13, 1983, at 1 30 p.m. at the Authority's Administrative Headquarters, and that the following persons receive Honour Roll Awards consisting of the planting of a tree suitably marked with a plaque Elgin H.. Card G. Hadden Gillespie Fred Kline (deceased) Reg Twi sel ton Earl Whitewood .E the Runnymede Collegiate Institute Stage Band be invited to participate and to perform before the ceremony; !l a lunch be provided for Honour Roll Award recipients, Authority members, and their guests, prior to the ceremony, with light refreshments (coffee, tea, cold drinks, and cookies) being served immediately following the tree planting ceremony; !! the Annual Garden Party be held on Wednesday, June 29, 1983, at 12 30 P m at Black Creek Pioneer Village Gold Service Recognition Awards will be presented to P B Flood, J Honingh, M. MacDowell, R. McMullin, and L. Maltby at the Garden Party. These staff members will also receive recnogition at the Staff Christmas Party Lifetime Passes will be presented to E T. Jackson and M.O P. Morrison, Foundation Members. Silver Recognition Awards and Lifetime Passes for staff will be presented at the Staff Christmas Party; !i the staff be directed to up-date the Recognition Policy with respect to the recognition of full-time staff of the Authority on retirement, and as to the suitability of the value of the gift in light of inflation. 15. MARKETING PLAN SUB-COMMITTEE Res. #91 Moved by W.G McLean Seconded by M.W.H. Biggar THAT the Vice-Chairmen of the Information & Education, Historical Sites, and the Conservation Land Management Advisory Boards, together with any other interested board members, be appointed to the Marketing Plan Sub- Committee CARRIED. B-79 -10- 16 Res #92 Moved by Mrs L. Hancey Seconded by S.A Macpherson THAT certain personnel matters be discussed in camera. CARRIED 17. Res #93 Moved by Mrs. L Hancey Seconded by M.W.H. Biggar THAT Mr K.G. Higgs be assigned to a position in which he is responsible for the overall development, co-ordination, and oPeration of the Conservation Land Management, Information and Education, and Historical Sites Divisions; the position to be established at an SM5C level at a salary of $51,633.00, effective date May-2-1983; THAT the Authority purchase, for the credit of Mr. Higgs, 75% (seventy- five per cent) of his past service credits with the ontario Municipal Employee Retirement System in the approximate amount of $41,000.00; AND FURTHER THAT funds for same be made available from the ~983 Budget. CARRIED Res. #94 Moved by Mrs. L. Hancey Seconded by W.G. Barber THAT the matters of administration re-organization and appointment of General Manager be deferred for consideration at the next regular meeting of the Executive Committee. CARRIED 17 TERMINATION On motion, the meeting terminated at 12 30 p.m., April 6. Florence Gell W E. Jones Chairman Secretary-Treasurer KC. B-80 SCHEDULE "A'~ SHORELINE MANAGEMENT PROJECT 1984 - 1986 APRIL 1, 1983 B-81 CONTENTS OF BRIEF PAGE PURPOSE 1 BACKGROUND AND POLICIES 2 LOCATION AND DESCRIPTION 3 1984 - 1986 PROGRAM 6 COSTS AND FINANCING 8 APPROVALS 9 - 1 - B-82 PROJECT FOR SHORELINE MANAGEMENT 1984 - 1986 PURPOSE The purpose of this Project is to permit The Metropolitan Toronto and Region Conservation Authority to exercise the powers afforded by The Conservation Authorities Act, R S 0 1970, Chapter 78, as amended, to establish and undertake, in the area over which it has jurisdiction, a program designed to further the conservation, restoration, development and management of the natural resources of the waterfront in accordance with the Shoreline Management Program of the Watershed Plan. The Project covers the three-year period 1984 - 1986 The goal of the Authority through this Project is to "undertake a comprehensive program of shoreline management designed to prevent, eliminate, or reduce the risk of hazard to life and property, while cognizant of the natural attributes of the lake front setting " B-83 - 2 - BACKGROUND The Authority has been responsible for the implementation of the Waterfront Plan for the Metropolitan Toronto region since 1970 Shoreline management measures were a component of that responsibility and were addressed in the two Five Year Projects, 1972-1976 and 1977-1981 Shoreline management works were undertaken in each municipality along the waterfront involving total expenditures of approximately $2,200,000 An additional $900,000 has been spent under the 1982-1983 Shoreline Management Project The importance of shoreline management measures has steadily increased as residential areas in particular are becoming increasingly threatened by shoreline erosion. The Authority decided in 1980 to prepare a separate program for Shoreline Management within the Watershed Plan in an effort to raise ilie level of awareness of the problem and secure stronger support for solutions The shoreline management measures employed to date can be classified into two components prevention and protection Efforts have been made to ensure that new developments are cognizant of the hazards of shoreline erosion and flooding Adequate setbacks and/or suitable shoreline protection have been employed to provide for maximum feasible protection of new developments The protection of lives and property in previously developed areas has been pursued by a combination of protection and/or acquisition Shoreline protective works have been installed in some instances to reduce erosion rates and increase the useful life of structures In other instances it has proven to be most economical to acquire endangered properties and allow natural erosion processes to proceed It may also be necessary to acquire properties since the erosion problem is too severe to be solved through protective works POLICIES The policies and operational criteria of the Authority governing shoreline works are enunicated in detail in the Shoreline Management Program of the Watershed Plan. - 3 - B-84 LOCATION AND DESCRIPTION The following is a sector by sector analysis of the proposed shoreline management measures to be implemented by the Authority The sector locations are shown on Fig 1 It should be noted that the areas detailed below are to be considered as a pool of priority sites which the Authority maintains and reviews on an annual basis Erosion is very dynamic in nature and as such. the Authority must be able to react as site conditions change It is for this reason that all waterfront sectors are included in the project At this point in time the most hazardous sites are located in the Scarborough sector and as such a more detailed list is provided The elements of the Authority's Shoreline Management Program related to prevention of development in hazardous locations are common to all sectors and are not reiterated here Borough of Etobicoke The extent of residential development combined with the physical characteristics of the shoreline have resulted in extensive successful efforts by individual property owners to protect the shoreline on a lot by lot basis Few serious erosion or flooding hazards exist in the Borough and the Authority's role has, therefore. primarily centred on protection of publicly owned land such as small parks This role is expected to continue. although specific sites have not been identified at this time Privately owned lands are also eligible for shoreline protection by the Authority provided that the operational criteria established in the Shoreline Management Program can be met This Project also includes shoreline maintenance of structures constructed as part of the Lake Ontario Waterfront Development Program. City of Toronto It is proposed that shoreline management works be undertaken at Gibraltar Point on Toronto Island. The proposed works are expected to include a shoreline revetment, groynes and beach nourishment Borough of Scarborough The most serious hazards resulting from shoreline erosion in the Authority's area of jurisdiction are located in the Borough of Scarborough Numerous locations have been identified where serious hazards either already exist or are developing As indicated earlier. the following is the list of sites requiring early attention In all cases under existing conditions these sites are more critical than any in the other sectors This however cou ld change with water levels and number and severity of storms 8-85 - 4 - Lakehurst Crescent Fallingbrook Drive South Marine Drive Guildwood Parkway Crescentwood Road Kingsbury Crescent Springbank Avenue Wynnview Court Fishleigh Drive Pickering/Ajax Shoreline hazards in this sector have been minimized by the Authority through acquisition of substantial sections of the shoreline prior to development Erosion of these valuable public areas is proceeding and may require measures from time to time to reduce the rate of loss There are no specific sites identified for work at present although numerous sites are proposed for monitoring to determine erosion rates Implementation Criteria The following criteria will be followed by the Authority in the design and construction of erosion control works (a) The major emphasis in the undertaking of protective works will be to control erosion due to wave action The required works will be designed in consideration of maximum expected lake levels as well as peak storm conditions; (b) Consideration will be given to bank stabilization techniques to be combined with toe protection in areas where additional protection is required to retain slopes at steeper than natural angles; (c) Shore protection will be carried out on a design block basis Design blocks are shoreline segments with physical characteristics which permit the segment to be protected as a unit The characteristics to be considered include shoreline configuration, construction access, bank condition, talus formations and wave energy Climate, among others; (d) Shoreline protection will be installed on a technical priority basis related to the safety of property and structures within the limitations of funding, approvals, construction access and property acquisition Priorities shall be based on technical criteria including, but not necessarily limited, to the following - distance from top of bank to structure - rate of slope retreat - extent of groundwater seepage .... ( --. 1 j~~:.? if' I : J , . .' , i. - ~.' ~ J' . i _ 1 " r:~."~".'; ~ I ,; -. " __'__, >:[, \ ' < ;. J I - ' -. /' ---- ,) .... l..... I' .--. f ,,' r I i \ . \' iI' : -f ...~... .J. - -'.t.t.- ..... I -__ /.......... . ! - --;, ... "I";} J-' ~ . .... -.....,. - : #/ /', _ / ~(-- f -l&!1! ::0;.'+11 !L:;;:'--~- J~ ,to i (T \ ~, ! ~ 1 . j ! .J) :fl[rl~!Jfl!:ffl~ ~.. \ : t~ I I tf /i.J~r71J.J!fjlf:j" ') ( ; ,........... OAT '" - . '. -? ,,~ ;<["'1. f,]' ~ ~ ""- &lALD INN LDWVlIW)ul;(: 40.. II '\ : l ~: ,: - ~:" -::;)""".." .. ~. ... .. .. ""::.TOfR<OI<Tf ,. '-'~-'JJf!:3:r<; :u .. lAST ..o.R ~ q.. . . I .. .. : Ptc" ~ ~ SUI"" . "f:R . . ......"........ "'.. i lNG/AJAX SECTOR-----7 : .,.. Q. . . EC10l" . : s : : :~SCARBOROUG" : : SHORELINE MANAGEMENT PROGRAM-SECTOR LOCATION FIG. I {Jl I co en B-87 - 5 - - height and steepness of slope - soil composition - vegetative cover, type and extent - evidence of previous movement - condition of toe of slope; (e) priorities for protection will be reviewed and approved by the Authority on an annual basis; (f) Existing waterfront public lands provide valuable recreational opportunities and, in many cases, serve as buffer zones between the shoreline and private lands Therefore, the balance between funding allocated for protection of public and private lands is an important relationship which should be approved annually by the Authority; (g) In cases where private property is involved, the Authority shall require title to the land for a nominal sum or an easement where applicable, and in addition may require a suitable financial contribution from the benefiting owner(s); (h) The Authority will assist in developing technology and distributing information which will aid property owners in limiting the erosion of the bank after the toe protection is installed - 6 - B-88 1984 - 1986 PROGRAM As indicated. the selection of sites for remedial work is done on a priority rating basis The continual monitoring of the sites contained in the pool of sites. particularly in the Scarborough Sector. enables the Authority to carry out remedial works where the greatest need has been demonstrated Based on the information to date. the proposed three year program will concentrate on the South Marine Drive area in Scarborough along with the completion of works at Lakehurst Crescent in 1984 It is anticipated that the time to complete the works at South Marine Drive will exceed the duration of this Project As a result, extensions to this Project will be required to continue at South Marine Drive and to deal with the other sites on the priority list A major component of the Authority's approach to shoreline management, as - indicated, is acquisition. This allows the Authority the ability to acquire properties which are in hazardous situations as a result of shore and bluff erosion and where remedial measures cannot be justified, from an economic basis Any property acquisition will be done in accordance with the Authority's Land Acquisition Program. Funding for waterfront hazard lands. however. will be raised as part of this Project In order for the Authority to carry out remedial works. appropriate engineering and soils studies are a necessity Environmental concerns must al so be addressed as part of any design and construction program. Funding is therefore required to carry out preliminary engineering designs, environmental inventories. geotechnical studies and slope monitoring studies Minor remedial works have also proven to be very effecti ve in reducing bl uff or toe erosion Through this component of the program the Authority can provide a "stitch in time" approach to many areas with the result that expensive remedial works may not be required in the future Such approaches as vegetation establishment. bluff drainage or beach nourishment have proven to be very successful and it is intended to continue to use this approach Funding for the three aspects of shoreline management is proposed on an annual basis as follows Major Remedial Works $ 575.000 Minor Remedial Works $ 15.000 Surveys and Studies $ 20.000 Acquisition $ 120.000 $ 730.000 The selection of sites for the annual work program will be finalized as part of the annual budget preparation However. as indicated. work will be concentrated at Lakehurst Crescent and South Marine Drive over the next three years Details of these two sites following below and are illustrated by photos 1 and 2 B-89 - 7 - Lakehurst Crescent The shoreline protection works at this site will be finalized as part of the 1984 work program. This work when completed will have provided protection to eight homes The protection will consist of bluff toe protection only Phase II of the works estimated at $200,000 00 will complete this site Bluff Height - SSm. Length of Shoreline - 400m. Potential Loss - 8 homes or $1,200,000 Total Cost - $450,000 Projected 1984 Cost - $200,000 South Marine Drive The first phase of protection works for this section is proposed for 1983 Again this section of shoreline is located in the Scarborough Bluff area Protective works are required to prevent the loss of 28 houses, a townhouse complex, and an apartment tower Very high rates of erosion are being experienced in this area with land being lost at 1 4 to 28m/year The value to be placed on the affected properties is very difficult to assess The relatively low cost of protective measures and the high degree of hazard more than justify remedial works The 1984 program will protect 200 m of shoreline at an estimated cost of $375,000 00 The total estimated cost is $4 4 million Problem - Bluff erosion due to wave action Height of Bluff - 50m. Length of Shoreline - 105 Om. - 200m. proposed for protection in 1983 Erosion Rate - 14- 2 8 m/yr Effects - Potential loss of 28 private homes, a townhouse complex and an apartment tower Cost - $375,000 00 for Phase I in 1984 As indicated earlier, work will not be completed at this site by the end of the Project A subsequent Project will be developed however, prior to the end of 1986 to continue with the Authority's Shoreline Management Program. - 8 - B-90 COSTS AND FINANCING Costs Implementation of the Shoreline Management Project 1984 - 1986 is estimated to require expenditures of $730.000 in each year for a total estimated cost of $2,190,000 The costs of the Project include legal and survey fees, land acquisition, engineering and geotechnical studies. site supervision and all materials. labour, equipment etc associated with the construction Financing It is proposed that the funds required for this Project be raised on the basis of 55% grant from the Province of Ontario and 45% from The Municipality of Metropolitan Toronto as benefiting municipality Annual funding requirements are therefore as follows - Province of Ontario $ 401,500 Municipality of Metropolitan Toronto $ 328,500 TOTAL $ 730,000 Total Funding for 1984 - 1986 Province of Ontario $1.204,500 Municipality of Metropolitan Toronto $ 985.500 TOTAL $2,190.000 8-91 SCHEDULE "B" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY BELLAMY ROAD RAVINE EROSION CONTROL PROJECT APRIL, 1983 B-92 CONTENTS PAGE INTRODUCTION 1 BACKGROUND 2 Design Objectivea 2 . Alternative Solutions 3 Recommended Solution 3 PROJECT TIMING 4 COST ESTIMATES 5 . B-93 - 1 - BELLAMYROl\D RAVINE EROSTON CONTROL PROJECT INTRODUCTION This Project was developed by the Metropolitan Toronto and Region Conservation Authority to propose erosion control measures in Bellamy Road Ravine in the Borough of Scarborough The Project summarizes the nature of the problems, highlights the possible solutions, presents a construction program and suggests a shared funding arrangement Bellamy Road Ravine is a steep valley cut into the land between Kingston Road . and the Lake Ontario shoreline approximately mid-way between McCowan Road and Markham Road It has an overall length of approximately 1,050 m along which the bottom elevation drops about 96 m (Fig 1) Thirty-five homes are located around the perimeter of the ravine on lots which extend into the ravine in most cases As a result, most of the lands affected by erosion are privately owned with the exception of a road allowance which extends from Ravine Drive through the bottom of the ravine to the lake The ravine was probably originally formed by a watercourse creating a small gully when it flowed over the edge of the bluff to the lake As erosion continued in the soft material of the bluff the gully grew deeper and wider Erosion of the side walls of the ravine was accelerated by groundwater emergence at several points Over many centuries the side slopes of the ravine reached angles that would allow vegetation to be more or less permanently established and the ravine may have been entirely vegetated prior to the time when the surrounding land was first cleared for agricultural purposes As the watershed of the stream was developed for agricultural and eventually residential uses the frequency of flows and the volume of water carried by the stream increased substantially The bottom of the ravine eroded downwards causing instability in the side slopes and leading to gradual loss of vegetation and eventually loss of table land around the ravine (see photos) The invert of the ravine continues to deepen at this time and most of the vegetation has been lost from the slopes in the lower part of the ravine Table land is being lost at an alarming rate in the southern parts of the ravine and similar losses will become evident in the central and northerly portions if the instability in the lower slopes is allowed to affect the upper slopes B-94 PROJECT FOR EROSION CONTROL ON THE BELLAMY RD. RAVINE LAKE ONTARIO .,. FIG. I -"11"..., - - B-95 - - r ~-..". _. ~_ ~ .. -]I , ... _-: " ,~~ _~ ~ '~ : -to;!'. ,,,.~I ; i" ..~ ,- A- - <0.. -.; ;.-- t~~' .- ~. .:' " ~ . .;~ '. 't.. ....-'"_ .:!>,' ~\~ '\..~ - ..~ .i(" .<t.~; ..; 1t: . .- ~ . .. ~ :... '. '. .~~ .1Lo' __ !" , , -- -. M LAKE ONTARIO NORTH FRO VINE LOOKING AD RA , BELLAMY RO GSTON ROAD TOWARDS KIN I ro I BELLAMY ROAD RAVINE LOOKING SOUTH TOWARDS LAKE ONTARIO ~ m OJ I 1.0 -J -1.1' ~ -44...;.;.... j -~ " -J..-4. ! :.. v.vI I .-l j 1 I. i BELLAMY ROAD RAVINE LOOKING SOUTH TOWARDS LAKE ONTARIO B-98 - 2 - BACKGROUND Concern about the erosion in Bellamy Road Ravine is not recently developed The same problem was considered in discussions among the Township of Scarborough, the Municipality of Metropolitan Toronto and the Authority in 1964 As a result, the Township of Scarborough constructed a rock filled, timber crib drop structure to stop further retreat of the ravine towards Kingston Road It was decided not to involve the Authority in any erosion control works at that time The designation of the Authority as the implementing agency for the Waterfront Plan in 1970 resulted in renewed interest in Bellamy Ravine It was identified as a significant potential pedestrian access link from the residential areas at the top of the bluffs to the lakeshore Various Authority programs prepared since that time have referred to the importance of the area but as the erosion continued the potential for a pathway connection, prior to implementation of major erosion control works, disappeared The 1982-1983 Shoreline Management Project identified that the Authority could be involved in the erosion control works in the ravine in cooperation with the efforts of the Borough of Scarborough to control the storm water The concern of the Borough of Scarborough for the steady deterioration of the ravine resulted in several actions The drop structure was replaced in 1981 to ensure that the upper end of the ravine was not undermined In addition, an engineering study was commissioned in 1979 to investigate the erosion problems and recommend remedial measures This study by Acres Consulting Services Limited examined several alternative means of stabilizing the ravine These alternatives are outlined later in this project Design Objectives There are several design objectives which should be used in the development and evaluation of alternative remedial measures The objectives are summarized as follows (1) eliminate future down cutting of the ravine i e stop the gradual deepening of the invert of the valley; (2) stabilize the side slopes of the ravine; ( 3) protect and enhance remaining vegetative cover and re-establish vegetation in areas where slope angles can be flattened sufficiently to allow vegetation to be effective; (4) continue to protect the upper end of the ravine where previous works have prevented rapid erosion towards Kingston Road; B-99 - 3 - (5) improve wildlife habitat; and ( 6) establish a hiking trail through the ravine in the long term Alternative SOl.utions The study by Acres Consulting Services Limited in 1979 examined a wide range of approaches to control the stormwater including the following (1) tunnel scheme - a tunnel could be used to intercept stormwater at the location of the existing drop structure and divert it around the perimeter of the lower portion of the ravine and discharge it into Lake Ontario Filling of the lower portion of the ravine and slope stabilization measures could be undertaken after the water was diverted around the ravine; (2) culvert scheme - a corrugated steel pipe sewer could be installed in the base of the ravine to conduct stormwater from the existing drop structure to Lake Ontario The sewer would require a number of drop structures to negotiate the steep gradient in the ravine without exceeding suitable flow velocities in the pipes Pipe construction would be followed by filling in the lower portion of the ravine and bank stabilization measures; and (3) gabion lined channel - fill material could be placed in the bottom of the ravine up to a level above which stable slopes could be built A channel lined with gab ion baskets could then be built in the upper part of the fill to carry the stormwater flows to Lake Ontario As in the other schemes the fill materials to be placed would have an approximate depth of 15 metres Recommended Solution The Borough of Scarborough considered the alternatives available on the basis of the design objectives as well as the construction feasibility and long term maintenance implications Serious concerns were identified with regard to the feasibility and safety of constructing either the culvert scheme or the gabion channel scheme within the ravine while contending with the instability of the valley slopes and the stormwater discharge flows which would be present on occasion throughout the construction period In addition, the Borough felt that maintenance costs associated with either the culvert or the channel scheme would be considerably higher than for the tunnel scheme On the basis of these considerations it was concluded that the tunnel alternative combined with filling and bank stabilization measures was the best solution Figures 2 " 3 B-IOO K T R UPPER SECTION / -REMEDIAL WORKS TUNNEl INTAKE SHAFT LEGEND: ......... ~~ij~T~AL CREST ~~ Vl~~e:~TIh",.bR ~zON\~lV. .... POTe:NTIA~T ... ROM 0. .... ASSUMING S CREST e:~EV : I VERTlc.'i.ORlzeNTA~' _ _ VINE BOTTO'" FROM EX. .\ RCAe '~~OW'NCE MAIN TUNNEL ~ II \' ~_._- .-150-- ,r OUTFALL AN ~ DISCHARGE TUNNEL ENERGY D STRUCTURD~SSIPATION Vn.f'Mlropol 1'.AR1O BEL ,"" ....""'.M '"II"" ",......."'" N''''''''' at! 5TO~:~~N RAVINE p.~€. FIG.2 'v SEPT. 1982 NEL ALICiNMEN ~IT I ~ OJ I f-' 0 f-' 170 170 LEGEND rn ",\C III[AOOWCLlffE TILl.. 160 160 G TI'tOIlNCl.lFfE fOllIll"TtON-OPPER ~'~:,::F~::', '~'d ,-J. I~ '~.':J SEWINAAY TILl.. .. 150 150 en Tu Tu en {:r.. .1 TI10lilNCLlfFE FORMATION LOWfR ILl ILl a: - :-;-.-- -;S:'---,-; .... - . < ~ -., ;--7'~~-----"'-- 0:: t- t- f'''~'~ ILl ILl $UN:HYBAOOK TILL ~ 140 ::r=~~I.~lU~~ " "~;:i~i.~;~1;0:&,'~'~~~ 140 ::l: ' . . z :o!: W - SCARBO"OUGH fORMATION SAND Z Z 0 0 ~ ~ 130 130 ~ SCARBOROUGH fORMATION CLAY ;; ~ " . .q~ .j; > ILl ILl E:J .J :~ .J '.... - RANDOM fiLL ", ILl ILl 120 120 " .,o' S~ 110 :.~ ".-.:4: 110 Ss ''; " . .: :.~-:... " .f: 100 ., ..... ,', ... . ... 0' ...; .... ... . .... .. 100 SLOPE REMEDIAL WORKS LOWER SECTION OF RAVINE SCALE I 500 TO \. NEXT t ROAD i M'. m~: ~~t;A~:~~;N- ' RANDOM fiLL I ---1==- ---------- -- ---- , LINED I DITCH ~ - RIPRAP PROTECTION PLAN THE CORPORATION Of THE BOROUGH Of SCARBOROUGH I ~~I(II FIG.3 STUDY OF EROSION CONTROL BELLAMY RAVINE SCALE I 500 B-102 - 4 - PROJECT TIMING There are clearly two components to this Project The first component deals with collecting and diverting storm runoff around the ravine while the second deals with reducing erosion in the ravine to save or prolong the lives of existing dwellings The first component of the work can be done immediately but the second component involves works to be done over a longer period This distinction in the type of work involved and the uncertainty associated with the estimated cost and timing of the future ravine stabilization works, necessitates that funding for the Project be developed in two phases Phase I would involve the construction of the sewer and dropshaft along with erosion control works from Kingston Road to the proposed inlet structure and along a tributary ravine that is eroding the easterly slope through Sylvan Park There would also be some re-vegetation to attempt to stabilize appropriate areas of the main ravine Since the ultimate solution to the overall erosion problem is as yet unclear Phase I would provide funding for additional geotechnical studies, environmental inventories and assessment, preliminary engineering and public participation The results of these additional studies will enable the Authority to develop Phase II of the remedial works and to prepare and process a separate Project for funding of the further remedial measures It is proposed that funding for Phase I of the Project be raised on the basis of a 55% grant from the Province of Ontario on a special project basis, and 45% from the Municipality of Metropolitan Toronto as benefiting municipality Funding for Phase II would be proposed on the same basis Phase I Stage 1 - involving the construction of the intake shaft, main tunnel, main dropshaft, discharge tunnel and outfall works at Lake Ontario Stage 2 - involving the upper section remedial works and such further erosion control works as are determined to be necessary including the Sylvan Park tributary ravine Appropriate engineering and environmental studies to determine type, cost and timing of Phase II FUNDING . Total PrOV1nce Metro Stage 1 1,450,000 797,000 653,000 Year 1 $1,450,000 $ 797,000 $ 653,000 Year 2 $3,170,000 $1,744,000 $1,426,000 Stage 2 Year 1. $ 100,000 $ 55,000 $ 45,000 Year 2 $ 300,000 $ 1.65,000 $135,.000 g~~g~g~ggg g~~2g~~ggg g~~~~~~ggg B-103 - 5 - COST ESTIMATES All cost estimates presented here are derived from estimates prepared by Acres Consulting Services Limited in the December 1979 report entitled Study of Erosion Control, Bellamy Ravine, Scarborough, Addendum 1 The estimates for tunnel components of the work are as provided by the Borough of Scarborough Works Department in March 1983 and are in 1983 dollars Main Dropshaft, Discharge Tunne 1 , Outfall works at Lake Ontario $1,450,000 Intake Shaft, main tunnel $3,170,000 Total for all underground works $4,620,000 The costs of the erosion control works are derived from the Acres cost estimates with 10% per year added for inflation Upper Section Remedial Works and Slope Restora- $400,000 00 tion $400,000 TOTAL COST $5,020,000 ---------- ---------- Implementation of the first phase of the Bellamy Road Ravine Erosion Control Project 1984-1985 is estimated to cost $5,020,000 00 as detailed above The costs of the project include legal and survey fees, land acquisition, engineering and geotechnical studies, site supervision and all labour, materials, equipment, etc associated with the construction FINANCING It is proposed the funds required for this project be raised on the basis of a 55% grant from the Province of Ontario and 45% from the Municipality of Metropolitan Toronto as benefiting municipality Total funding requirements for phase I are as follows Province of Ontario $2,761,000 Municipality of 2,259,000 Metropolitan Toronto $5,020,000 , THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY DIVISIONAL EXPENDITURE SUMMARY FOR THE PERIOD JANUARY 1, 1983 TO MARCH 31, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ Finance & Admin.(incl. Land Acq ) 3,186,465 689,643 2,496,822 21 6 Water Resource - Flood Control 2,911,389 467,354 2,444,035 16 1 Water Resource - Waterfront 2,325,000 131,437 2,193,563 5 7 Conservation Land Management 3,548,345 693,387 2,854,958 19 5 Information & Education 2,426,623 482,432 1,944,191 19 9 Historical Si tes 3,912,822 388,086 3,524,736 9 9 Vehicle & Equipment - Capital 280,730 25,519 255,211 9 1 SUB-TOTAL 18,591,374 2,877,858 15,713,516 15 5 Vehicle & Equipment - Operations 66,390 Special Projects 138,191 C O.E.D 2,123,808 -- 2,123,808 -- Food Services 833,317 50,267 783,050 6 0 Ul () TOTAL 21,548,499 3,132,706 18,620,374 14 5 ::c t'l 0 ===================================================================== C L' t'l tll I I-' () 0 = ... ~ , B-I05 the metropolitan toronto and region conservation authority minutes REPORT #6/83 EXECUTIVE COMMITTEE 4-MAY-1983 '6/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 4-May-1983. PRESENT Chairman Mrs. F.E. Gell Vice-Chairman E.V. Kolb Members W.G. Barber E. Fulton Mrs. L. Hancey (For J.S. Scott) W.R. Herridge, Q.C. H.C. Lawrie S.A. Macpherson Ms. S. NilIlIllo (For M.W.H. Biggar) F.R. Perkins Mrs'. N. Stoner Authority Member R.J. Crowe ABSENT Members M.W.H. Biggar - J.S. Scott . DELEGATION . Metropolitan Parks Department -Black Creek Master Plan: Finch Avenue' to Shoreham Drive Mr I!' E. Kershaw, Manager, Planning & Development Division of the Metropolitan Toronto Parks & property Department, made a presentation concerning the above-noted plan. The Plan proposes a bicycle path with two attendant bridges crossing the watercourse,. one south' of Shoreham Drive and the second south of the Hydro corridor. The 3-metre-wide asphalt path will conform to other Metro Parks. tracks, enabling maintenance' by the Department, and facilitating Police surveillance. Construction of the bicycle path is' anticipated in June and the bridges in the autumn of 1983. It is expected that all work, including landscaping, will be completed by the end of spring 1984. Res. #95 Moved by: Mrs. L. Hancey Seconded by: E. Fulton THAT the Black Creek Master Plan - Finch Avenu& to Shoreh~ Drive, be approved; THAT the- Metropoli tan Toronto- Parks and property' Department- be advised that the proposed park br.idges- are. subject to review and approva-l. under. the Authority'S: regulation; AND FURTHER THAT consideration be given to. holding a I sod. turning' ceremony to. mark the inception of the Plan. CARRIED. MINUTES Res:~ #96 Moved' by: Mrs'.. NO. Stoner Seconded by: S.A. Macpherson ~- THAT Resolution #93 of Executive Committee Meeting Minutes t5/83, as written, be deleted and the following substituted therefor: B-I06 -2- "Res #93 Moved by Mrs N Stoner S.econded by M W H Biggar THAT Mr K G. Higgs be assigned to a posi don in which he is responsible for the overall development, co-ordination, and operation of the Conservation Land Management, Information and Education, and Historical Sites Divisions; the position to be established at an SM5C level at a salary of $51,633 00, effective date May-2-1983; THAT the Authority purchase, for the credit of Mr Higgs, 75% (seventy-five per cent) of his past service credits with the Ontario Municipal Employee Retirement System in the approximate amount of $41,000 00; AND FURTHER THAT funds for same be made available from the 1983 Budget CARRIED Res il94 Moved by: Mrs L. Hancey Seconded by W G Barber THAT the matters of administration re-organization and appoint- ment of General Manager be deferred for consideration at the next regular meeting of the Executive Committee CARRIED. " SECTION I ITEMS FOR CONSIDERATION 1 ALBION HILLS CONSERVATION FARM. Res. #97 Moved by H C Lawrie Seconded by E.V Kolb THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr Dwight Matson be selected to operate the Albion Hills Conservation Farm; AND FURTHER THAT the appropriate Authority officials be authorized and directed to sign an agreement between The Metropolitan Toronto and Region Conservation Authority and Mr Dwight Matson, in form and content similar to .the current Albion Hills Conservation Fa.rm agreement. CARRIED SECTION II ITEMS F.OR INFORMATION 2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #98 Moved by Mrs. L. Hancey Seconded by W.G Barber THAT the applications listed herein as A(l) to A(lO) inclusive, be approved, subject to the conditions contained in the reports. CARRIED A(l) Town of Vaugha.n ~ To construct 3 steel arch culverts to carry proposed urban collector Rivermede Road over West Don River, vicinity east of Keele Street, south of Langstaff Road (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing Nos 82-116-3, Sheet 3; 82-116-4, Sheet 1; 82-116-7, Sheets 1 to 4. , -3- B-I07 A(2) Marathon Realty Company Limited To construct 2 storm sewer outfalls, east of Airport Road, north of Derry Road, City of Brampton (Mimico Creek Watershed) In accordance with the following documents, which shall form part of the permi t Drawings Nos 8146-A-5, 6, 14, 18, 19, 20, 21, 23, and 24, prepared by Paul Theil Associates Limited, and dated September, 1982. A(3) City of North York To construct storm sewer outfall in area of Riverside Drivel Whitfield Avenue, City of North York (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing No R-96, Sheet 2 of 2, dated October 19, 1982 A(4) Mr. William M. Gerrits To construct addition to structure, #1972 Southview Drive, Town of Pickering (Duffin Creek Watershed) In accordance with the drawing entitled "Proposed Sunroom Enclosure", prepared by the applicant, which shall form part of the permi t. A(5) Consumers' Gas Company Limited To re-locate existing gas main across the puffin Creek at Baylv Street, Town of Ajax In accordance wi th the following documents and plans, 'which form part of the l?ermit (a) Drawing #40-0021 prepared by Consumers' Gas Company Limited and dated January, 1983 ; (b) A letter dated April 11, 1983 from Consumers I Gas Company Limited to Mr D J Prince of the Authority office A(6) Mr Daniel G Hopkins To build house at ~1766 Finch Avenue, west of Bluebird Lane, Town of Pickering (Duffin Creek Watershed) In accordance with the following documents and plans, which form part of the permit A drainage plan, dated April 12, 1983 and l?repared by the applicant A(7) The Regional Municipality of Durham To construct 3 57 metre widening of Bayly St:eet bridge and under- take minor channel improvements adjacent to l?rol?osed piers (Duffin Creek Watershed) !n accordance with the following documents and plans, which shall form part of the [?erm i t (al Drawings #1 and P2, MTC Structures, Site 22-165, prel?ared by Totten Sims Hubicki Associates and dated November, 1982; (b) Detailed specifrications for Contract 383-12, Pages S-3, 5-16, and 5-17 B-108 -4- A(8) Sagitta Developments Ltd To construct storm sewer outfall and drainage channel to the Duffin Creek at C N R , north of Stouffvil1e, Town of Whitchurch-Stouffvi11e In accordance with the following documents and plans, which form part of the permit (a) Project #3696-3, Drawing #45, as prepared by Project Planning Associates Ltd and dated April 8, 1983; (b) Project #3696-3, Drawing #213, as prepared by Project Planning Associates Ltd and dated June, 1977 A(9) The Municipality of Metropolitan Toronto To place fill for wideningt of Dufferin Street from Finch Avenue south to Stanstead Drive, City of North York (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing Nos P-IOIO-24, P-I010-25, U-131-13, and U-131-14, prepared by the Metropolitan Toronto Works Department, and dated October 1981 Consulting Limited A(10) Kenneth & Marion Dickinson To construct addition to residence fronting on Sylvan Crescent, Town of Richmond Hill (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawings #8236-1, 2, 4, & 5, as prepared by Aurora General Contractors, dated April 7, 1983 3 Land Acquisition Project 1982-1984 Humber River Watershed -Property Lothar & Jane Schlechter #268 King Street East, Bolton Res #99 Moved by Mrs N Stoner Seconded by S A Macpherson THAT the report (April 21, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED "Re Project Land Acqui~ition Project 1982-1984 _ Flood Plain & Conservation Land Component Humber River watershed Authority Executive Resolution #88, Meeting #4 _ April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property #268 King Street East, Bolton Owners Lothar & Jane Schlechter Area to be acquired a) 0 08 acres, more or less - purchase b) 0 04 acres more or less - temporary easement Recommended purchase price $6,000 00, plus vendors' legal costs, together with suitable landscaping -5- B-109 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being a partial taking from a residential property, being Part of ~ot 'G' , Plan BO~-7, Town of Caledon (The Reg ional Municipality of Peel). This land is required for the Bolton channelization works. This transaction also includes the acquisition of a temporary ease- ment required during the period May 1st to December 31st, 1983. A temporary road detour, to facilitate construction of the flood control works, is included in the immediate vicinity of the vendors' residence "Negotiations have been conducted with the owners and their solicitor, Norman B. I:.ipson, Fogler, Rubinoff, Suite 1400, 150 York Street, Toronto, Ontario, MsH 3Tl, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $6,000.00, plus vendors' legal costs, together with replacement of trees, and suitable landscaping, with date of completion of this transaction to be as soon as possible. The price also includes payment in fu 11 for the temporary easement and any inconvenience resulting from the construction. "I recommend approval of th i s purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, leg al costs and disbursements are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has rev i ewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401, Flood Plain I:.and Acquisition" 4 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED -Property: City of North York West of Denver Crescent (Sheppard Ave./~eslie Street Area) Res. HOO Moved by Mrs N. Stoner Seconded by S.A. Macpherson THAT the report (April 14, 1983 ) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and ,that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED "Re Project Land Acquisition Project 1982-1984 Flood Plain & Conservation Land Component - Don River Watershed Authori ty Executive Resolution #88, Meeting #4 - Apr il 8, 1981, and Authority Resolution jl38, Meeting #3 - May 15, 1981 Subject property West of Denver Crescent Owner City of North York Area to be acquired o 048 acres, more or less Recommended purchase price Nominal consideration of $2 00 "Included in the requirements for the above-noted project is a rectangularly shaped parcel of land, being all of Block fA', Plan 6311, City of North York (The Municipality of Metropolitan Toronto), located west of Denver Crescent, in the Sheppard Avenue/Leslie Street area "Negotiations have been conducted with officials of the City of North York, and, subject to the approval of your Committee, agreement has been reached with respect to a 9urchase price, as follows The purchase price is to be the nominal sum of $2 00, with date of completing the transaction to be as soon as possible B-110 -6- "I recommend approval of this purchase and that the legal firm Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authori ty is to receive conveyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition in Account 0-04-11-401 - Flood Plain Land Acquisition " 5 CONSUMERS' GAS COMPANY LIMITED -Request for Permanent Easement vicinity Humber Lea Road and King Street, Bolton (Humber River Watershed) Res. nOl Moved by Mrs N. Stoner Seconded by S A Macpherson WHEREAS it is necessary for an existing gas line and permanent easement in favour of the Consumers' Gas Company Limited to be re-located to facilitate certain flood control works in Bolton; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act to grant a permanent ease- ment to facili tate re-location of the gas line; THAT a permanent easement, containing 0.015 acres, more or less, be granted to the Consumers' Gas Company Limited in the Bol ton area; said land being Part of Lot 184, Block ' I' on a Plan of the Village of Bolton referred to as BOL-7, and Part of Lot 30 on a Plan of the Village of Bolton referred to as BOL-9, designated as Part 1 on Plan 43R-10765 Consideration to be the nominal sum of $2 00, with the Authority being responsible for all legal and survey costs in connection with the transaction; THAT said grant of easement be subject to an Order-in-Council being issued in accordance with Section 21(c) of the Conservation Authorities Act, R S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorised and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any , documents CARRIED 6 ADDENDUM TO PROJECT FOR CHANNEL IMPROVEMENTS ON THE HUMBER RIVER, FORMER VILLAGE OF BOLTON -Final Engineering Res n02 Moved by Mrs N Stoner Seconded by S A Macpherson THAT the firm of Marshall Macklin Monaghan Ltd be retained to carry out the detailed engineering and contract administration for Phase II of the Humber River Channel Improvements project, former Village of Bolton, at an estimated cost of $53,500 00 CARRIED 7 CHANNEL IMPROVEMENTS ON THE HUMBER RIVER, FORMER VILLAGE OF BOLTON -Extra Work Order #5 Res n03 Moved by Mrs N Stoner Seconded by S A Macpherson THAT Extra Work Order #5 to the contract for the Humber River Channel Improvements in the former Village of Bolton, in the amount of $5,740 00, be approved; AND FURTHER THAT the approval of the Ministry of Natural Resources be requested CARRIED -7- B-lll 8 CLAIREVILLE CONSERVATION AREA -Equestrian Programme Res. n04 Moved by Mrs N Stoner Seconded by H C Lawrie THAT the staff be directed to develop a suitable agreement between the Authority and the Equine Recreation Company for the operation of an equestrian programme at Claireville Conservation Area CARRIED. 9. KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme Hydroelectric Display Model Res nos Moved by: Mrs N. Stoner Seconded by Mrs L. Hancey THAT the contract for the construction of a Hydroelectric Display Model for the Kor~right Centre for Conservation Energy Theme be awarded to Barber Hydra~lics Limited at a cost of $2,950.00, including Federal and Provincial Sales Taxes CARRIED 10 REPORT ~1/83 - MARKETING PLAN SUB-COMMITTEE Res n06 Moved by: W G. Barber Seconded by H.C Lawrie THAT the Progress Report and Recommendations - Marketing Plan for the Conservation Areas, Black Creek Pioneer Village, and the Kortright Centre for Conservation, dated Aprrl 27, 1983, as amended and appended as Schedule "An of these Minutes, be received and the recommendations contained therein be approved; . THAT the staff be directed to develop a Marketing Plan for 1984 for the consideration of the Marketing Plan Sub-Committee and the Executive Committee in September of 1983 ; AND FURTHER THAT consideration be given to developing an overall monthly Horki ng document or work plan to include the three operating divisions CARRIED 11 STAFF FINANCIAL PROGRESS REPORT -January l/March 31, 1983 Res H07 Moved by Mrs N Stoner Seconded by F R perki ns THAT the Staff Financial Progress Report for the period January l-March 31, 1983, as appended as Schedule "B" of these Minutes, be received. CARRIED 12 MEMBERS' SALARIES AND ALLOWANCES Res. H08 Moved by Mrs N Stoner Seconded by S A Macpherson THAT the staff report having regard to Ontario ~unicipal Board approval of the following Chairman's salary of S19,000 00 per annum Vice-Chair~an's salary of $7,400 00 per annum Per diem allowance of $48 00 for members be received CARRIED B-1l2 -8- 13 DISPOSITION OF THE MATTER OF APPOINTMENT OF GENERAL MANAGER AND DIVISIONAL RE-ORGANIZATION Res H09 Moved by Mrs L Hancey Seconded by Ms S Nimmo THAT consideration of Agenda Item 9(4) of Executive Committee Meeting #6/83 be deferred until such time as the Executive Committee has met with the Chairmen of The Municipality of Metropolitan Toronto and The Regional Municipali ties of Durham, Peel, and York CARRIED NEW BUSINESS 14 QUOTATION #83-5(I&E) -Black Creek Pioneer Village Walkaround Tabloid The following quotations have been received for the web offset printing, folding, and supply of 150,000 copies of the Black Creek Pioneer village Walkaround Tabloid web Offset Publications Limited $3,644 68 Uxbridge Printing Company Limited 3,810 78 The village Press Ltd 4,200 00 Panographics Limited 4,385 29 Johnstone/Adams Graphics Ltd 4,828 48 Res #110 Moved by Mrs N Stoner Seconded by W G Barber THAT the quotation of Web Offset Publications Limited for the printing, folding, and supply of 150,000 copies of the Black Creek Pioneer Village Walkaround Tabloid, in the quoted sum of $3,644 68, including Federal and provincial Taxes, be accepted CARRIED 15 JOINT TOUR - BOROUGH OF SCARBOROUGH AND M.T R C A Res H11 Moved by Mrs N Stoner Seconded by Ms-< S Nimmo THAT the staff communication be received; AND FURTHER THAT all Authority members and appropriate staff be invited to attend the tour CARRIED 16 TOUR - DON VALLEY ADVISORY BOARD The Chairman of the Don Valley Advisory Board advised the Committee that an all-day tour of the Don River watershed is proposed to be held on a date to be selected in June The itinerary may include the fo 11 owi ng sites Tour to commence in Richmond Hill German Mills Creek Three Damage Centres Storm Water Mmanagement projects Keating Channel Erosion Problems Lunch probably at the Waterfront Invitations will be extended to local interest groups and to interested Authority members Res H12 Moved by Mrs L Hancey Seconded by t1rs N Stoner THAT the staff be authorised to make suitable transportation and luncheon arrangements for an all-day tour for the Don Valley Advisory Board and other interested parties CARRIED -9- B-113 17. CANADA/ONTARIO EMPLOYMENT DEVELOPMENT (COED) At the request of the Chairman, Mrs Deans presented a brief report on the hiring of prospective workers for the above-noted programme A progress report on COED will be presented by Mr Higgs to the next regular meeting of the Executive Committee 18. EXECUTIVE MEETING - JUNE 15 Mr. Kolb invited the Committee to hold its June 15th meeting at his Caledon residence Mrs. Gell accepted, with appreciation, on behalf of the Executive. 19. SESQUICENTENNIAL CELEBRATIONS - CITY OF TORONTO Mr. Herridge suggested that a preliminary report of the Authority's proposed participation be prepared by September/October, 1983, and advised that he would be prepared to do whatever he can to assist 20. TERMINATION On motion, the meeting terminated at 12 30 p.m., May 4. Florence Gell W E. Jones Cha i rman Secretary-Treasurer " KC. B-114 SCHEDULE llAlI PROGRESS REPORT AND RECOMMENDATIONS -- Marketing Plan for the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation SUMMARY OF RECOMMENDATIONS IT IS RECOMMENDED THAT 1 The overall marketing objectives of the Authority be - Increase the net revenues of the Authority, primarily from increased attendance where possible, and through other means where appropriate; - Maintain or decrease, if possible, the proportion of total operating costs that come from municipal levies; - Accomplish the above in a fashion consistent with the historical development philosophy of the Authority As well, where practical, the pricing policy of the Authority's offering should reflect a maximum return from users Where appropriate, commercial activities occurring on Authority's property should be offered on a franchise basis to the private sector 2 The complementary strategies be (1) Remove the impediments to growth by improving the quality of the facilities and services; (2) Encourage repeat business among existing users; , ( 3) Increase the net revenue generated from visitors during each visit; (4) Attract new users 3 The establishment of an adequate "Major Maintenance Reserve Account" be investigated and be the subject of a separate report to the Executive Committee at a later date; 4 The facilities being evaluated in the Master Planning process for Boyd be considered for product development in other Areas: 5 The staff be directed to study ways and means of incorporating special programs and promotions related to Toronto's sesquicentennial and the Province's bicentennial in 1984; 6 An interdivisional program be initiated for training of staff at all levels on hospitality and selling: 7 Discount practices be carefully monitored in 1983 to determine their effectiveness in increasing attendance and revenues; B-115 - 2 - 8 Telephone calls be monitored for a trial period on evenings, weekends and holidays, to determine the long-term policy to be adopted for the service: 9. All school children participating in Authority programs receive an Authority promotional brochure; 10. An extensive group selling program be initiated; 11 upgrading of signage be done, whenever appropriate, to facilitate visitor orientation: 12 The Authority become more involved in the Travel Trade Industry: 13 Continuing and increased research and monitoring data be collected and interpreted, to provide a basis for future marketing plan recommendations: 14 Professional assistance be obtained in developing questionnaires, methods of sampling, sample size and analysis and interpretation of the data; 15. Predetermined bench marks be established as an index against which to measure changes in attendance and/or revenues and thus the effectiveness of the Authority's Marketing Plan. ~ ************************ , TEB/mrp 1983 04 27 8-116 INDEX Page Number PRO Due T ~ 1 QUALITY (a) General - at Conservation Areas - at Black Creek Pioneer Village - at Kortright Centre for Conservation (b) Major Maintenance 7 . (c) Food Services 7 2 DEVELOPMENT (a) Conservation Areas 8 (b) Black Creek Pioneer Village 9 (c) Kortright Centre for Conservation 10 3 PROGRAM 11 4 HUMAN RESOURCES 13 P R I C I N G 14 COM M U N I CAT ION S S T RAT E G Y 15 , OBJECTIVE 16 STRATEGY 16 METHODS 16 SID1MARY OF RECOMMENDATIONS - Immediate Action 19 - Short Term 21 TRAVEL TRADE 23 C 0 E D PROGRAM 23 TORONTO SESQUICENTENNIAL 24 RESEP,RCHJ r 0 NIT 0 P I ~ G & CON T R 0 L 26 - B-117 TO The Chairman and Members of the Marketing Plan Sub-Committee, M T ReA., Meeting ~1/83, Friday, April 15, 1983 FroM T E. Barber, R. K Cooper, P. B. Flood RE PROGRESS REPORT AND RECOMMENDATIONS -- Marketing Plan for the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation In 1981 The Metropolitan Toronto and Region Conservation Authority engaged the firm Woods Gordon as marketing consultants, to prepare a Marketing Plan for the Authority This action was taken as a result of declining attendance, revenues from fees and other sources not keeping pace with costs. and increasing requirements for provincial grant and municipal levy to sustain operations uespite increasing municipal levy, the maintenance of the facilities has been deteriorating at an accelerating rate In summary, more funding is necessary to maintain the existing facilities It may be possible that users could provide a greater proportion of the funds required for operations and maintenance The fOllowing graphs serve to illustrate and bring into focus attendance, revenues, costs and municipal levy at the Authority's public use facilities. - 1 - -- ~ ATT ENDANCE 1,200 - --- -- t- --~ n K- -I- - /"\ -I- - \ OJ 300 - - 100 I ,/ ..... I-' -1--- -----1-----,---- 1- - --1-- - I-' - -- ,/ ~ 00 1,000-1---- -_-I - - I ,/ - 250 I ~ 80 800 - ~r; ~~ 7 ~ = - q--- 200 - II -II' , -- -- -p --I-- I- - n_ I - -- -- I- 600 - - -- -- - 150 - "- ...-:. - - - - -- - --- - - - - -- - f-- n _ - l- I n __ - - - - 400 - - --- -- '" 100 -- I- 20 c - - -- >- -- - -- - I- - - I- - z .. '" 200 - I- - I- - - - --- -- -- - -- - - - -- - - - - :> 50 - n - I- 10 c -' % I- 1957 1960 65 1970 75 1980 82 1960 65 1970 75 1980 82 1979 1982 CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE REVENUES/ EXPENDITURES FOR CONSERVATION REvENUES EXPENDITURES - - - - 500 l- n _ --- - - -- I- - -- -- - - I- - - --- - f- - -- - - -- -- -- - -- - -- -- - - ---- 2000 I- - - -- -- - -- -- -- li 1,600 - I- - I- - -- - -- -- -- -- -- -- -- 400 I u_ n - - - -- -- - - - - -- - L I- 1,400 - c- -- I - - --- - - - - n -- - - 1- - -- --=- "- I\) 1500 - 1-- - - - - 1,200 II - -- - -- ,- n -- - L_ - I- , I -/ - I- 1,000 7 ~ - 300 1- - ----, - -'" Co' V . I 1000 -- - .L ~ i- 890 "'-'- n - -- I- -.... I- ~ I- 600 l- f...-': -- '" ~ ~ 200 .... ~ ~ 400 ". I 500 - .... I"- J.JI ..... z .. .. "'- '" '" " g 200 :> - - :;;.0 c - - I- % % 0 I- 0 I- 1957 1960 65 1970 75 1980 82 1960 65 1970 75 1980 82 1979 1982 CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE MUNICIPAL LEVY FOR CONSERVATION 1000 - - 400 130 -- - - - -- --- - -- -- -- - l- n ) - --- --- - -- - -- --- - - -- - - -- -- - - - -- - -- - --- 7 -- - -- -- -- - -- - - - -I- -- - - -- -- -- - - -- - -- -- -- - -- -- - - - - -- 100 / V ,/ -f- - - . --. .... 500 - -- I - - 200 I- - 1- -- -- - -- - - -- n_ -- - _u - n -- - --- ---. J- 70 - -- -- - -- - - - - -- -- - - --- - -- - - - - -- -- -- -- - V - .... '" -- ~ ~ -- - -- - c - I- - - - -- -- - - - - --- - -- V \ ~ z L 1-:' .. -- -- - - - -- -;,I _n - -- - - -- ---- - - .... .... - \ I- - 1 \ I g 40 ",- ~ % 0 0 I- 1957 1960 65 1970 75 1980 83 1960 65 1970 75 1980 83 1979 1983 CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE 1981 DOL LARS FOR CONSERVATION MUNICIPAL LEVY CONSERVATION ARE AS, BLACK CREEK PIONEER VILLAGE 6 KORTRIGHT CENTRE fOR CONSERVATION 2,000,000 -,--.---r-~.---------- -- --- --~ -,----- ------- ---- --- -- -- -- - --- ---- -- -- - -- ---- -- -- -- --- - - -- -- --- --- - -- -- -- -- -- --. -- --."- - - --- - ---. - - - - - - - - -- ---- -- -- -- -- -- __no -- -- -- -~- -- -- - -- - - - -- ---- -- -. -- - - --- ---- -- - -- 1,500,000 - - . --- -- -- -. - -- - - - - --- - -- -- --- I -- -- -- e--- ---- --- -- --"" -- -- - J '" ---- -- ---~ - - - - - -- - -- ---- -- -- -- -- -.-- -- - -- - - -- J I -- -- - - - -- --- - - -- -- --- -- --. - -- -- --- -".- .- - 1/ - -- --- -- _.. - - - - - -- ---- -- --- -- -- -- -- -- - 1,000,000 - --- -- - ------ -- f--- --- --- - - -- - - -- ---. --- -j I-- --- --- -.- . - .. - - - -- 1--- -- ---- ---- - - -- -" -- --- - ---- ---- ~ If ---. ---- --- - - --- -- - - -- - - -- -- -- "' V -- - -- - - -- - - - -- -- -- ---. - - -- -- --. -- - -- V- - - f--- --- J ~ 1-- I-- 500,000 - - 1--- - -- -- - - - - --- -- - --- --- -- 1---- --- -- - -- -- --- -- 7 t= --- -- r-- t-- / --- f' ./ -- f--- - e---- - 0 1957 1960 65 1970 75 /980 /982 CD I ..... ..... \D B-120 The staff endorses the general direction of The Plan, and the need for a more aggressive marketing approach The overall marketing objectives are summarized as follows - Increase the net revenues of the Authority, primarily from increased attendance where possible, and through other means where appropriate; - Maintain or decrease, if possible, the proportion of total operating costs that come from municipal levies; - Accomplish the above in a fashion consistent with the historical development philosophy of the Authority As well, where practical, the pricing policy of the Authority's offering should reflect a maximum return from users Where appropriate, commercial activities occuring on Authority's property should be offered on a franchise basis to the private sector These objectives have led the consultant to recommend four complementary strategies 1 Remove the impediments to growth by improving the quality of the facilities and services; 2 Encourage repeat business among existing users; 3 Increase the net revenue generated from visitors during each visit; 4 Attract new users The following is a summary of action taken, or planned, for 1983 with respect to recommendations on Product, Pricing, Communications Research, Monitoring and Control - 4 - B-121 PRO Due T 1 QUALITY The attractiveness of a facility is vitally important for repeat visitation During the past five years insufficient funds have be~n available to adequately maintain the Conser- vation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation. Generally, the Authority's facilities look "run down" Substantial improvements in maintenance were initiated in 1982 and are planned for 1983 I' (a) General at the Conservation Areas - a substantial catch-up program of maintenance was carried out in 1982; - maintenance upgrading will continue in 1983 under the C 0 E D Program; - upgrading of refreshment stands; - revitalizing the nature trails A maintenance and operations plan at each area will result in an improvement in quality - 5 - B-122 at Black Creek Pioneer Villaqe - the painting of several buildings in 1982: - the painting of the Flynn and Burwick houses in 1983: - minor repairs to all buildings Rather than being done on an irregular basis, the maintenance will be scheduled starting in 1983, and will be carried out based on a series of scheduled daily, monthly and quarterly inspections at the Kortright Centre for Conservation The approval of the C 0 E D Program, along with the Fisheries Sector Work Program, the Parks Maintenance Program, the Student Employment Program, the Federal/ Provincial Employment Incentive Program and both summer and winter Experience '83 Programs, will permit - repairs to, and substantial improvements to a number of indoor exhibits and outdoor demonstrations; - improvements to trails; - painting, staining and repairs to the Centre building; - maintenance of other buildings and facilities in the outdoors - 6 - 8-123 (b) Major Maintenance Regular maintenance is provided for within the annual operations and maintenance budget of each project Provision has. not been made for major maintenance. An adequate major maintenance reserve account must be established in order that major repairs can be made when required, without adversely affecting the annual operations and maintenance budgets (c) Food Services The lack of satisfaction from food services was a I serious impediment to growth at Black Creek Pioneer Village and at the Conservation Areas: and to a lesser extent at the Kortright Centre for Conservation On March 1st, 1983, the Authority started operating its own food service, on a management fee contract, with a Food Services Manager in the Authority office It is anticipated that the quality of service will improve and food will relate more closely to the area program and visitor, and become an attraction encouraging repeat visitation, with a resultant increase in sales and net revenues - 7 - 8-124 2 DEVELOPMENT The Plan recognizes the vital importance of the further development of facilities to meet the present and future requirements of the Authority's visitors Without ongoing development to update the facilities, it will be difficult to increase, or even sustain, present attendance levels (a) Conservation Areas The Marketing Plan recommends facility development to make the Conservation Areas more competitive in 1983 It has been estimated that a budget of $300,000 would be required This level of funding is not available in 1983, but the following facility improvements will be carried out - horseback riding at Claireville; - bulletin boards at the areas; - development of themes for each area, with printing and distribution of area brochure; - development of improved refreshment stands; - signage review and improvement Many of the Marketing Plan recommendations are being evaluated within the Master Planning process for the Boyd Conservation Area - 8 - 8-125 (b) Black Creek Pioneer Village The first phase of the Black Creek pioneer Village Visitors Centre will begin in 1983, and be completed for the 1984 operating season Work will be done on the following buildings in 1983 - Tinsmith Shop and Masonic Lodge (may be completed); - further restoration of the Richmond Rill Manse; - Sawyer's Rome (landscaping will be completed) ; - Taylor Cooperage (will be furnished and equipped) Through funding from C.O E D , the following buildings will be opened and staffed in 1983 - Doctor's Rome; - Flynn Home; - Sawyer's Home; - Taylor Cooperage; - Dominion Carriage Works The walkaround map has been improved, to make visitors more aware of all the Village sales outlets - 9 - 8-126 (c) Kortright Centre for Conservation The development of the area was seriously curtailed in mid 1982 by a cutback in the Ministry of Natural Resources grant The facility development is now dependent on funding from contractual arrangements with Ministries, make-work programs and The Metropolitan Toronto and Region Conservation Foundation The following facility developments will be completed in 1983 - marsh viewing facilities and boardwalk; - forestry trail; - outdoor Energy exhibits, including a 10 KW windmill; - exhibits for Forestry, Water, Fish & Wildlife and Renewable Energy Themes; - additional audio-visuals; - Land Theme building and exhibits; - provision of additional eating area; - theatre seating; - temporary Wood Arts Centre - 10 - 8-127 3 POOG~ The innovative programs for the public in the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation attract additional visitors, provide increased opportunities for publicity and promotion, and encourage repeat visitations. To some extent, special programs tend to counteract the effect of adverse weather conditions on attendance. Some programs, in addition to the admission fee, provide opportunities for additional revenue from fees for staff or equipment use, increased sales from food services and other sales outlets (especially at Black Creek Pioneer Village and the Kortright Centre for Conservation) The following programs are scheduled for 1983 - 11 - 8-128 PROGItAMS AND EVENTS ... 1911l !!2!!.!.!l Con..rvatlon Ar... Black Creek Pion..r Villaqa It'ortriqht Centre tor Con..nation Janoory ... Sled 009 Rae.. (Cold CeNt) ... SkatLn9. '1'oboqganinq and ... vinue Wildlife DetacU..,. Aik.. ... IIletIL....' Tr1al.- ICla,iraviUa BorM-dr."" 5181gh Ride. ... IQtroduotion to Mature Photography and Cold CrHkl lweatMr penlittin9) ... Mind l!:necqy Owl Prowl ... GrOUAdhoq o.y previ.. '""nary ... AlItrt.vel' 1'rlah (Ch.r..Ula ... SlLI.tin;, Toboq9a.nin9 and. ... Snow Slake and Cold Cr..k) Hoca..drawn Sl.i9h R1d.. .. SftOW' Hike. .. Slutar1 (Bruce'. MUll Cveath.r peraittinvt .. OWl Prowl .. Sled Do9 bee.. (Cold Cr_k) .. atrdhOu.e Buildinv Nark.hop. 4 H111 Winter C.un1val IBruce'a Kill) .. Wl.ldl1t. "'Drk. ot Clen La..te. Moarcb .. Sled 00qI Race. (Cold Cre-ek) .. " T...te ot Haple .. Sprinv Tonl.c . Retri.v.r Trul. (Cl.irevill. - Colourtul Coverl.t. - Sap on Tap (Maple Syrup) ..Cd Cold Cnek) Go Ply a Uu - Maple Syrup ee.on.tration. .. WildlUe IIlorlr.. ot PraftJI. de Matteis (Sruce'. Mill) Aprll - Retriever ?rial.. (Chir..ille " T..te of Moaple - Sprinq 1l00d proqr.. (urly Sprin91 and Cold Cr.ek) - Colourtul Coverlet. Trout r..tl.val hater 1:99' HWlt 4 Wildflower Bl.k.. - StreUl rlllprovement May - blablin; Bill. Riding Club PUt-Ti../Play-TiM. 5a"*'l1l Demon.tration. Hona Show (Albion HUh) Or Zonk . Ku..aUlll of - Ra1n, Runoff and River. SciantiUc Curiodtie. - Pond St.udy - Sprinq rail' 4 Bea Spaca - Mot.her'. OAy (Special rAAJ.ly a.to) lUli tary Manoeuvre. - Oauqhter by Adoption Wondertul Nool J.... Rambling Hilh Ridinq Club - Nonderful Mool - Day Hike o&1ooq t.he H\Ull.ber - Upper CAnadA Rifle. alack Powder - Mak Ing Nood Nark In P lon_I' - Radio Telemetry ShOot (Cold Cr..k) Ontario - Bee Spac. - Roq.t10nt.1d. Servl.ca - -SWl- Oay "ather'. Day (Specl..l raaily RAtel JUly - Claireville Open Waterut - Moater Oay Con..rvat1on in the BODIS Toul'ft&lMlnt - Victorian ....Uy Picnic - RiveraJ.de MlaaAdera - Ontario W..teraki Ch.ampion.hipa (we.kend.) - as. Spac. (Cla1reviUa} CI.1r....ill. Novic. Waterak! To~nt GI.n Hatty rahinv Derby - Rollinq Hilh Ridinq Club (Alb:Lon 8111a) A\l9u.t R.adio Controlled 'lyLnq Club ot ,.....luly Fun (....e.kend.1 - Inaeot. AU", Toronto - Fly-Ln (ColC! Creek) - Rlv.r.ida "'-and.r. CI.J.reYllle NoYice Waterskl S.. Spac. Champlon.hlpa Endanqared Specie. Rolllnq Hl11. Rldlnq Club Sept4lllber RLde.tJ\on (Cl.LraY11le) Corn '..t Ronay ....tiv.l Upper C4,ftada R!tlu (Cold Cr..k) - OUtdoor Hf1U1 51ng - It . About Wood !nerqy Roll Ln9 H1lh RldLnq Club - honeer re.dyal (Sept. 17) Huntin; Shih Turltey ShoOt fCold Cuelt) - Honey ..air October Doq Show (Cold Croaltl Celebr.te the Appl. Harye.t Hurricane Ha.el Rell'leSberad Upper ColIn.d. Rille. (Cold Crllalt) Pumpkin Party - TurkllY Shoou (Cold Cuekl Hobqoblin. P.r.de NaY.llber - RetrLever Tn&l. (Cl.ir.vJ.ll. Cratt ....tLval S.wmill Tour. and Cold Cre.k) Christmaa Ln the viUa9'l B:Lrd "eeder Work.l\op. Turkey Shoot ,Cold Cnak} Dec-.mber Retr1.ver Trhla (Cl.ireYUl. ChrlaUlol.. Ln the VUlaq. - Chri.t..Na .LD thei Country and Cold Cr_k) We r. tor the B:Lrd. SIu Op.an Hau.. (Albion Bill.) - 12 - 8-129 Many programs are similar to those carried out in 1982 Some new programs and events are being added and the least successful programs are being eliminated For example, five new programs were added to Black Creek Pioneer Village, and additional "participation" components are being added where possible. 1984 will mark the sesquicentennial of the City of Toronto and the bicentennial of the Province of Ontario The staff is currently studying ways and means of incorporating special programs and promotions at the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation, to g1 ve the publicity a contemporary and fresh approach for 1984 4 HUMAN RESOURCES The need for more "direct sell" by all staff at each facility is required if the Authority is to maximize its marketing efforts. Training programs have to be targetted at seasonal staff, regular staff and supervisory staff A program is currently being developed, with the assistance of the Authority's new Personnel Officer This program would be interdivisional and be a supplement to existing divisional programs, providing for training of staff at all levels on hospitality and selling - 13 - 8-130 P R I C I N G The admission fee at the Kortright Centre for Conservation was increased from $1 00 to $2 00 for adults, and from $0 50 to $1 00 for students and children, in 1982, with annual membership being $25. per family and $15 per individual The fee will remain the same in 1983, as do the fees at the Conservation Areas and at Black Creek Pioneer Village ($2 weekdays, $3 weekends per car, $30 per season's pass at the Areas; $4 per adult, $1 75 per child or student, family maximum $8 00, $25 family and $15 individual annual citizenship at the Village) Revenues from citizenships at Black Creek Pioneer Village and memberships at the Kortright Centre go to the Foundation's Growth Endowment Fund, with interest revenues provided to help fund operations and maintenance at these facilities As a promotional incentive, during the recent years substantial discounting has been offered, including free tickets distributed to selected individuals and audiences A non-restrictive discount practice should be continued in 1983, in order to take advantage of private sector promotional opportunities, and this practice should be carefully monitored in 1983, to determine its effectiveness in increasing attendance and revenue - 14 - 8-131 MARKETING PLAN 1983 COM M U N I CAT ION S S T RAT E G Y The success of a Marketing Program is predicated on the availability of product, and Metropolitan Toronto's product is available in all sorts of packages backed by an extensive and, in some cases, a nearly overwhelming structure of support and sales Metropolitan Toronto's appeals are varied Products are packaged in dozens of imaginative, appealing and financially attractive combinations This Authority operates in the largest and most influential market in Canada, where there probably exists every element imaginable of a competitive environment There is no other region in Canada that offers " as many alternatives for leisure-time activities Consider the overwhelming number of different. facilities available for recreational/learning experiences Each one offers differential pricing and uses varied marketing and communications (advertising and promotion) strategies The development of a Marketing Plan by The Metropolitan Toronto and Region Conservation Authority was initiated in 1980 It came about in response to a perceived need to increase attendance and/or revenues at Black Creek Pioneer Village, the - 15 - 8-13 2 Kortright Centre for Conservation, the Conservation Areas and Indian Line Tourist Campground THE CQf.1i'lUiH CATIONS STRATEGY - 1983 OBJECTIVE To maintain the upward trend of attendance at the facilities that was recorded in 1982 STRATEGY To meet the objective, a program has been developed which encompasses all aspects of the Authority's communication activity, including promotion, publicity, advertising and sales services In 1983, the Communications Program will expand on providing information on the recreational opportunities available in the Metropolitan Toronto region The program is designed to take advantage of every opportunity available to compete in a very volatile and aggressive market place METHODS News Releases Photo Releases News Articles Newsletters Flyers - 16 - B-133 Radio Public Service Announcements I Synopses Television Public Service Announcements (60 sec spots) Paid Advertising (Direct) Paid Advertising (Cooperative) Slide Shows Brochures (General, Black Creek, Kortright, Conservation Areas and Calendar of Events and Activities) Brochure Distribution - a) professional services b) cooperative ventures c) staff d) mail Posters Annual Reports Visitors Surveys - Metropolitan Toronto Convention and Visitors Association Special Functions I Receptions - a) joint ventures b) Authority Special Promotional Techniques - a) discount coupons b) mail inserts, in cooperation with municipalities Public Speaking Engagements Placemats Radio and Television Interviews Foreign Travel Writers' Tours Displays - 17 - 8-134 Exhibits Signage (Bulletin boards) Photography Slide and Photo Library Word Processing - computerized system for selling our products and services Sales Service - Telephone - a) during business hours b) evenings, weekends and hOlidays Media Contacts Memberships - Tourist and Travel Associations - a) Metropolitan Toronto Convention and Visitors Association b) York Region Tourist Committee c) Central Ontario Travel Association d) Tourist Association of Durham Region Teleguide / Telidon System The foregoing briefly outlines the Authority's action programs, specifying those activities that are believed to be critical to its success Also, as suggested in the Woods Gordon Report, August 1982, consideration has been given to the Recommendations for Immediate Action (late 1982 / early 1983) and Short-term Action (1983) , which identify some of our target markets The 1983 Communications Strategy has allotted the resources available to programs aimed at these targets, which are - 18 - 8-135 a) the current user; b) the potential market - repeat-users and non-users SU~~~RY RECO~~1ENDATIONS - IMMEDIATE ACTION (Page VII - Woods Gordon Marketing Plan) 1 a) Training and providing staff for telephone answering sales work on evenings, weekends and holidays The staff-operated telephone answering service was implemented at 5 Shoreham Drive, Downsview, on March 19, 1983 The program provides for a staff answering service from 4 00 P m to 8 00 pm., Monday through Friday; S 00 a m to 6 00 pm, Saturdays; and 8 00 a.m. to 4 00 pm., Sundays and holidays This program has proven to be a very effective selling service for the Authority's public use facilities The program has been carefully monitored, to-date (see Survey - April 1 - 4, 1983) , and, after a trial period of approximately 3 months, the Authority will be in a position to determine the long-term policy that should be followed with respect to the service b) Print material is available in bulk quantities at all facilities 2 The Village Walkaround Map promotes events, and identifies areas where food and merchandise can be purchased - 19 - 8-136 3 Continuing with selective paid advertising and cooperative advertising a) Travel and Tourist Associations b) Heritage Magazines c) Naturalist Publications d) Camping Books 4 Many school children visiting the Authority's facilities receive the general brochure 5 Bulletin boards are being installed in high traffic locations, at each of the Authority's sites, to promote special events, as well as the other Authority facilities In the Conservation Areas, this is being done in conjunction with a new program that the Cbnservation Land Management Division has initiated 6 The Authority invites media contacts to a number of special events throughout the year, which may include luncheons, barbecues, Arbor Day, etc 7 a) Contact with ethnic groups has been enhanced lately through the ethnic newspapers of the region b) Contact with corporate groups will be made possible by an extensive selling program that will soon be launched using the word processing system 8 The Authority plans to upgrade distribution of literature to libraries, recreational stores, municipal offices, etc , as part of the C 0 E D Program 9 Increased placement of displays and exhibits in shopping malls, municipal offices, etc , is also included in the C 0 E D Program - 20 - 8-13 7 10 Major site signage has been considerably upgraded at the Kortright Centre, but changes elsewhere are not easily accommodated due to the regulations of the Ministry of Transportation and Communications Upgrading of site signage, to facilitate visitor orientation in the Conservation Areas, is included in the Conservation Land Management Division's plans for this year SUf:lI,lARY RECOm'1ENDATIONS - SHORT - TERr1 (Page VIII - Woods Gordon Marketing Plan) 1 Telidon terminals have been in place at Black Creek Pioneer Village since October 1982, and terminals will - be installed at Indian Line Tourist Campground and the Kortright Centre for Conservation by the end of April There are presently 290 Teleguide / Telidon units installed in the Metropolitan Toronto region, located as far west as Oakville, east to the Metro Zoo and north to Canada's Wonderland The T.eleguide \ system currently has more than 14,000 pages of information, with the average usage per terminal being approximately 700 to 800 pages per day The Teleguide units are installed in twelve shopping centres, and this number will increase by 10 within the next month The average usage rate per terminal in these shopping - 21 - 8-138 centre locations is over 2,000 pages per day During the week of March 21 to 27, more than 1,650,000 pages of information were looked at The material on the Teleguide system is also available at the Ontario Travel Centre ~n Barrie, the Palace de Congress in Montreal anq the Vista system located in 400 home terminals across Ontario As well, some hotels have in-room data availability The Authority has 15 pages of information on the Teleguide system, promoting the facilities and programs at 8lack Creek Pioneer Village, the Kortright Centre for Conservation and Indian Line Tourist Campground, as well as the special events taking place in the Conservation Areas All the material is cross- indexed with each of the facilities 2 Increased direct selling activity to groups, clubs and associations will soon be taking place, now that the word processing unit is ready to be used 3 The Authority's functions are organized by the Information Staff, and special events and programs that take place at the Authority's facilities are the responsibility of the operating Divisions The balance of these recommendations have been adequately explained under the Immediate Action Summary - 22 - B-139 TRAVEL TRADE In 1983, the Authority will become more involved with the Travel Trade Industry, directing efforts at travel agents and group travel planners so that they may be aware of its products and facilities Up to this point, material regarding the Authority's operations has been distributed to travel pla~ners by the Ministry of Tourism and Recreation and the Metropolitan Toronto Convention and Visitors Association, as part of their travel trade campaign The Authority has applied for membership to the American Tour Brokers Association and its Canadian counterpart Therefore, the opportunity to more effectively promote the Authority's facilities will be enhanced This program will require a commitment from operating management C.O.E.D, PROGRAM SUPPLEMENTAL .MARKETING ACTIVITIES The objective of the project is to supply additional support for the marketing program currently in progress Activities of the proposed project include 1 Distributing promotional literature to libraries, community centres, information booths and trade shows, via a supplied vehicle - 23 - 8-140 2 Acting as resource persons for the general public, when staffing the Authority exhibits at local shopping centres, malls and trade and recreation shows 3 Monitoring visitor trends and attendance levels at special program events 4 Conducting necessary research, and monitoring on a project basis, as required Gross Staff Labour Material Costs Proiect Costs 5 $63,777 Vehicle, Literature, Uniforms $91,577 $27,800 TORotHO SESQU I CENTENN iAL March 6, 1984 marks the 150th anniversary of the incorporation of Toronto To commemorate the event, an ongoing city-wide celebration is planned to involve every citizen of Toronto, and to lure more visitors to the city than ever before -- a boon to the hospitality industry The Authority should be making plans to participate in this celebration, as well as Ontario's Bicentennial - 24 - B-14l The development and implementation of quality programs, a pricing structure and a delivery system at all Authority facilities, combined with an effective Communications Program, are the keys to successfully achieving the goals set by operations management for 1983. , - 25 - ell I I-' 01>- N W E EKE N D TEL E P H 0 N E A N SHE R I H G DATE April 1, 2, 3, 4 PERIOD 8 - 9 am 9 - 10 am 10 - 11 am 11 - 12 N l2N - 1 pm 1 - 2 pm 2 - 3 pm 3 - 4 pm 4 - 5 pm 5 - 6 pm CALLS Gen Sp Gen Sp Gen Sp Gen Sp Gen Sp Gen Sp Geo Sp Gen Sp Gen Sp Gen Sp Total BLACK CREEK 14 84 3 84 7 71 2 38 3 27 2 14 3 13 1 8 2 2 1 380 KOR'l'RIGlIT 6 1 30 43 24 1 24 1 12 12 1 1 1 157 CONSERVATION AREAS 8 2 15 5 14 3 10 8 2 9 2 4 2 7 3 94 MULTIPLE 6 I 13 14 13 8 4 3 4 65 BUSINESS 11 33 31 23 16 15 14 22 1 166 'l'OTAL 48 183 196 145 100 71 53 48 14 4 862 - 26 - B-l43 RESEARCH} r.1OtHTORING AND CONTHOL If the Authority intends to adopt a marketing approach to its public use facilities, continuing and increased research and monitoring data must be collected and interpreted. This would include updating the Visitors Survey, monitoring the effectiveness and reaction to special events and promotions, measuring changes and reaction to food services, monitoring telephone enquiries, survey of non-users, and monitoring the effectiveness of free passes and discounts The data collection and tabulations have been provided ,for within the C 0 E D Program It is essential that professional assistance be obtained in developing the questionnaires, methods of sampling, sampling size and analysis and interpretation of the data To measure the effectiveness of The Plan, it is essential to establish predetermined bench marks as an index against which to measure attendance and/or revenue at the Authority's public use facilities - 27 - 8-144 SCHEDULE IIB" To The Chairman and Members of the Executive Committee, M T R C A From Mr R. K Cooper, Administrator, Historical Sites Division Re Progress Report - January 1 to March 31, 1983 - - HISTORICAL SITES PROJECTS ( Deve lopmen t) =- A town barn has been re-erected behind the Hackenzie Home It originally stood at the Toll Gate between Woodbridge and Kleinburg and was owned by Lex Mackenzie's family The building has been restored through the generosity of Lex's two nieces, Jessie Glynn and Je~n Agnew, - and a sizeable donation from the York Chapter of the Pennsylvania German Folklore Society All of the machinery for the Nesbitt Sawmill has been moved on site and most of the structural work has been completed . RISTORICAL SITES PROJECTS (Operations & Maintenance) - - (a) Registration and Artifacts During the first quarter of 1983 the Village received 36 items from 7 donors An 1830 York County cupboard on long term loan from Ontario - Heritage Foundation has been placed in Half Way House kitchen. Black - Creek again loaned several items to C B C for its student quiz "Reach for the Top" The Grange, Art Gallery of Ontario, was assisted by the loan of a - large number of artifacts for an exhibit relating to the making of maple - s ug ar - A volunteer has assisted the registrar several hours each week - (b) Publicity and Promotion Commercial photography in the first quarter of 1983 included a week - long production for Xerox by Glen-Warren ~roductions Limited; a segment - for the feature film "Dead Zone"; and a cover shot and fashion layout for - Eaton's Christmas Gift Catalogue Media coverage for January, February and March was aimed at the Village opening and the Ta~e of Maple program The "Toronto Star", "Globe and Mail" and nSunlt ran photographs in early March to publicize - the Village and the Maple program C B C ' s "Fresh Air" interviewed Jeanne Hughes at the end of March - to publicize the Village and upcoming events Staff members have given several lectures in recent weeks Mr - Cooper presented a paper at an Ontario Historical Society seminar on - - ArChitectural Heritage Presentation; Mrs Jeanne Hughes spoke at two o H.S seminars on Preparing for Ontario's Bicentennial Mrs Hughes also opened an exhibit of hooked rugs p=esented by the Heritage Rug Rooking - Guild at the Toronto-Dominion Centre - (c) Special Events In the first three months of 1983 two weddings and one Church service were held at the Fisherville Church Three banquets were held at the Half Way House The food services contract covering Half Way House diningroom and the snack bar at the Village ended in February Warren Rill Catering was replaced by a new food services arrangement operated more directly by the Authority through Dalmar Foods Ltd There is now a food service manager, Mr Ken Hannan, working in the Authority office On March 31st the Masonic Order held a formal sod turning ceremony for the Tinsmith Shop/Masonic Hall being restored at Black Creek The Masons are raising the monies to restore this building, and construction will start in mid-May .-- .~~ - (d) Building and Grounds Maintenance Regular winter cleaning for all Village buildings was completed for the opening on March 19th Half Way House dining room kitchen was - repainted and the equipment was cleaned and overhauled. The Village staff- - room was also repainted One wagon was completely rebuilt and the other overhauled and repainted. Apple trees and other shrubs were pruned, and the gardens - prepared for spring planting Many of the picnic tables were re-stained and 90 steel drums were prepared for use as garbage containers in the parking and picnic areas. Additional outdoor lighting was installed for evening use at weddings and banquets. A cab was fabricated for the -- tractor, and this will make it more comfortable for winter use (e) Livestock Over the winter five colts were being trained and two or three will - be used on the wagons this season. Three lambs were born in March and - the rest are due in mid-April. Two older horses were sold before the end of the year. (f) Staff Several staff members attended an Ontario MuseUM Association Conference on Work in the Nineteenth Century Mr. Cooper attended a series of Senior - Management seminars sponsored by the Ministry of Tourism and Recreation. - - (gl Visitors Centre Early in March the Ron. Bruce McCaffrey announced that the Authority - had been successful in its application to Wintario for $530,000. Architect Gordon Cheney is busy preparing plans and specifications, and construction - should start prior to July 1st The Authority has authorized a request - to Lottario in the amount of $l,833,000 to complete the total project. EXPENDITURE A..~D REVENUE STATEMENT JANUARY 1 TO MARCH 31, 1983 - EXPEND ITURE HISTORICAL YEAR , OF FORECAST -- SITES PROJECT TO DATE BUDGET TO - (DEVELOPMENT ) EXPEND. BUDGET USED DEC 31/83 - 34,026 l,995,000 l.7 1,995,000 HISTORICAL - SITES PROGRAi."1S YEAR , OF FORECAST (OPERATIONS & TO DATE BUDGET TO - MAINTENANCE) EXPEND . BUDGET USED DEC. 31/83 339,411 l,760,322 19 3 l,760,322 REVENUE - 1983 RECEIVED , OF INCOME PROG~ BUDGET MARCH 31/83 RECEIVED - 1,451,6S0 50,Ol3 3.S - FINANC:IAL COMMENTS Village attendance for the winter program was 12,253, down 3,549 from 1982. The complete lack of snow and poor conditions for maintaining the rink explain this decline. Correspondingly, the gate revenue is down by almost S7,000.00, to Sl8,75S.00. Gift shop and Village revenue are also down by approximately $6,000.00. The number or citi:ens for 1983 is 252 This compares with 196 for the same period in 1982, and 230 for 1981 The Dickson Hill School Program continues to be fully bOOked and both school break weeks were booked in March. The Village has received approval for 33 persons to be hired on t.'1e C. 0 . E. D Program. This program will enable the Village to re-open two buildings planned to be closed for the 1983 season, ocen several buildings not opened before, take visitor surveys, and carry out needed labour intensive maintenance 1983 04 15 , B-146 STAFF PROGRESS REPORT Property Section During the period January 1, 1983 to March 31, 1983, the Property Section of the Finance and Administration Division completed the acquisition of 15 new properties containing 332 398 acres. The total acreage of lands owned by the Authority, as of Ma~ch 31, 1983 is 27,832 142 acres During the period the property Section spent a considerable amount of time in the preparation, negotiation, and processing of shoreline management and erosion control agreements. The Property Section also carried out all of the administration management requirements in connection with Authority-owned lands; i e. agreements, easements, assessments, taxes, leases, rentals, insurance, etc A breakdown of the properties and acreages acquired by the Authority to date is as follows ET08ICOKE CREEK WATERSHED Flood Control and Water Conservation - 1 property settled during period containing 0 841 acres; - 1 purchase - Etobicoke Creek Flood Plain Lands - Commercial and Home Builders Ltd Property, located west of the West Mall north of The Queensway, Borough of Etobicoke - 1 property sale during period comprising 0 786 acres; Snelgrove Dam and Reser~oir Lands - sold to the City of Brampton for road and bridge construction purposes (0 786 acres) , Total to date--67 properties acquired containing 453 521 acres; - 2 expropriations outstanding Conservation Area Total to date--l0 properties acquired containing 418 866 acres; Total of Watershed 77 properties acquired containing 872 387 acres MIMICO CREEK WATERSHED Flood Control and Water Conservation - 1 property settled during period containing 0 108 acres; - 1 purchase Mimico Creek Flood Plain Lands - Estate of Stella Orr Property, located west of Beaucourt Road in the vicinity of Berry Road, Royal York Road, and Oakfield Drive, Borough of Etobicoke - 2 properties expropriated during period comprising 0 340 acres; (Permanent Easements) /2 B-147 - 2 - Mimico Creek Flood Plain Lands - J. Szybalski Property, - W vasis Property, located at the rear of Oakfield Drive, in the vicinity of Beaucourt Road, in the Queensway/Royal York Road area, Borough of Etobicoke Total to date--40 properties acquired containing 84.628 acres; - 2 expropriations outstanding Total Watershed: 40 properties acquired containing 84.628 acres. HUMBER RIVER WATERSHED Flood Control and Water Conservation - 5 properties settled during period containing 5.289 acres; - 3 purchases - 2 permanent easements Humber River Flood Plain Lands - Replete Investments Limited Property, located on the north side of King street, east of Humber Lea Road, in the Bolton area, Town of Caledon (1 Purchase; 1 Permanent Easement) - Town of Richmond Hill Property, located east of Bathurst Street, north o~ King Sideroad in the Oak Ridges area, Town of Richmond Hill. (1 Purchase; 1 Permanent Easement) - Municipality of Metropolitan Toronto Property, located on the east side of B~ack Creek Drive, north of Industry Street, City of North York. - 2 property sales during period comprising 6 782 acres; Claireville Dam and Reservoir Lands - sold to the Ministry of Government Services to facilitate the extension of Finch Avenue (6 782 acres) Total to date--780 properti.es acquired containing 8,548 231 acres; Conservation Areas Total to date--79 properties acquired containing 4,305 773 acres; Forest and Wildlife Areas Total to date--l0 properties acquired containing 786 486 acres; Agreement Forest Lands Total to date--23 properties acquired containing 1,865 745 acres; Niagara Escarpment Lands Total to date--4 properties acquired containing 25l.926 acres; Total of Watershed 896 properties acquired containing 15,758.161 acres 13 B-148 - 3 - DON RIVER WATERSHED Flood Control and Water Conservation - 2 properties settled during period containing 30 952 acres; - 2 purchases - Don River Flood Plain Lands - Municipality of Metropolitan Toronto Property, located on the west side of the Don Valley Parkway, north of Millwood Road, 80rough of East York. - E Glina property, located on the west side of Old Cummer Avenue, south of Cummer Avenue in the Bayview and Finch Avenue area, City of North York - 1 property sale during period comprising 0.332 acres; - Willowdale Dam and Reservoir Lands - sold to E Glina in a land exchange (0.332 acres) Total to date--188 properties acquired containing 1954 812 acres; - 4 expropriations outstanding Conservation Area Total to date--l property acquired containing 9 350 acres; Total of Watershed 189 properties acquired containing 1,964 162 acres HIGHLAND CREEK WATERSHED Flood Control and Water Conservation Total to date--143 properties acquired containing 823 911 acres; Conservation Area Total to date--2 properties acquired containing 118 626 acres; Total of Watershed 145 properties acquired containing 942.537 acres ROUGE RIVER WATERSHED Flood Control and Water Conservation - 1 property sale during period comprising 0 959 acres; Milne Dam and Reservoir Lands - sold to the Region of York for road widening purposes (0 959 acres) Total to date--119 properties acquired containing 2,107 842 acres; /4 8-149 - 4 - ROUGE RIVER WATERSHED continued Conservation Area Total to date--2 properties acquired containing 267.038 acres; Total of Watershed 121 properties acquired containing 2,374.88 acres. DUFFIN'S CREEK WATERSHED Flood Control and Water Conservation - 1 property sale during period containing 1 236 acres; - Stouffville Dam and Reservoir Lands - sold to the Town of Whitchurch-Stouffville for road extension purposes (l 236 acres) Total to date--90 properties acquired containing 9ls 152 acres; Conservation Area Total to date--l9 properties acquired containing l,076.s68 acres; Forest and Wildlife Area Total to date--l6 properties acquired containing l,749.696 acres; Agreement Forest Lands Total to date--l property acquired containing 93.000 acres; Total of Watershed 126 properties acquired containing 3,834 416 acres. PETTICOAT CREEK WATERSHED Flood Control and Water Conservation Total to date--l property acquired containing 22 139 acres; Conservation Area Total to qate--l property acquired containing 177 918 acres; Total of Watershed 2 properties acquired containing 200 057 acres LAKE ONTARIO WATERFRONT Waterfront Plan - 4 ?roperties settled during period containing 294 868 acres; - 4 purchases; /5 B-150 - 5 - - Etobicoke Sector - Ministry of Natural Resources Property, located south of Lakeshore Boulevard, in the vicini ty of Park Lawn Road, in the Borough of Etobicoke Pickering/Ajax Sector - Region of Durham property, located on the north side of 8eachpoint Promenade, east of West Shore Boulevard, in the Frenchman's Bay area, Town of Pickering - Scarborough Sector - Estate of W. A Tiffin Property, located south of Lawrence Avenue East, in the Chesterton Shores area, Borough of Scarborough - Federal Government Property, located in the Sunnypoint Crescent/ Eastvil1e Drive area, Borough of Scarborough Total to date--27s properties acquired containing 1,751 484 acres Conservation Area Total to date--9 properties acquired containing 49 430 acres; Total of Lake Ontario Waterfront . 284 properties acquired containing 1,555 476 acres SUMMARY FLOOD CONTROL AND WATER CONSERVATION January 1 - March 31, 1983 - 11 properties settled containing 37 530 acres; (- 7 purchases; - 2 permanent easements - 2 expropriations during period) - 6 property sales Total to date--l,428 properties acquired containiing 14,910 236 acres; - 8 expropriations outstanding CONSERVATION AREAS January 1 - March 31, 1983 Total to date--123 properties acquired containing 6,423 569 acres /6 B-lsl - 6 - FOREST AND WILDLIFE AREAS January 1 - March 31, 1983 Total to date--26 properties acquired containing 2,536 l82 acres. AGREEMENT FOREST LANDS January 1 to March 31, 1983 Total to date--24 properties acquired containing 1,958.745 acres. NIAGARA ESCARPMENT LANDS January 1 to March 31, 1983 Total to date--4 properties acquired containing 2sl.926 acres. WATERFRONT PLAN January 1 - March 31, 1983 - 4 properties settled containing 294.868 acres; (- 4 purchases) Total to date--275 properties acquired containing l,7sl 484 acres , GRAND TOTAL OF ALL PROJECTS January 1 - March 31, 1983 - 15 properties settled containing 332.398 acres; (- 11 purchases; - 2 permanent easements; - 2 expropriations during period) - 6 property sales Total to date--l,880 properties acquired containing 27,832 l42 acres; (11,263 668 hectares) - S expropriations outstanding DO!aw 1983 04.25 B-152 TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M T R C A - Meeting #6/83 FROM MR J C MATHER, AD~~NISTRATOR, WATER RESOURCE DIVISION RE WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY. 1, 1983 .T.o MARCH. 31, .1983 The attached progress report is presented for the period January 1, 1983 to March 31, 1983 The report details both the physical and financial progress of the various programs and projects in the Flood Control and the Waterfront Sections Also included is a status report on the Fill Violations as prepared by the Development Control Section Attachments 1983 04 25 JCM/md OPERATING STATEMENT PAGE 2 J BV PROGRAM PERIOD ENDING 830331 REP 109 - --- ._~ - "- E X PEN D I T U RES REVENUE g_a~=a_~=~==~:~~;=~=~==~~~.==_~:~=m~~-~_~~;Q~=~~~CQ;a ~gO._~:~~=~QE=G~~~_~;c=m===a~===_~R~_g= M-T-D V-T-D X FUNDS "-T-D Y-T-D X BUDGET ACTUAL. ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD iilili:lc:c;:::zg;: g;Il:C==~ m=a=a== ........ a;...~:I;_==m.a: a811:;;II:; :I "--- .CDli:l.m._ - SUiIl=:l__=_ -=:;;;a:= -- .-. WATER RESOURCE - FL.OOD CONTROL. =~~A=Q~~"Aa~a~a#~~a_~aQm;g=~~~ ADMINISTRATION-FLOOD CONTROL 743.652 66.851 190.079 2~ 0 553.573 743.652 5,382- 5.3S2- 7 METRO - EROSION CONTROL 396,500 32.322 79.844 20 1 316.656 390.500 27,900- 27.900- 7 0 .-.~ YORK - EROSION CONTROL. 23.500 9.589 9.752 41 5 13,748 23.500 1.400- 6 0 PEEL - EROSION CONTROL. 35.600 0 35.600 35,600 0 DURHAM - EROSION CONTROL ~.OOO 0 5.000 ',000 0 --------.--, -"-- PlANNINQ AND REMEDIAL. MEASURE 1.343,500 20.530 112.675 8. 4 1.230.825 1.343.lK>0 0 RIVER FORECASTING, OP " HAIN 119,637 8,270 29,220 24 4 90,417 119,637 0 SMAL.L DAMS, CtIAN. Ir ER CONT 244,000 18,769 45,784 18.8 198.216 244,000 0 - -- ---------- -- -- -------------------------------------.- -~------------ --------------------------------------- TOTAL 2, 911. 389 156,332 467,354 16 1 a, 444, 03:) a, Ii11, 389 33,282- 34,682- 1 2 -------------------------.---------- ----.------------ --------------------------------------- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL - - __u -- - - . - - ---- ----.--- ----- --------.- -- - '-.- -- - -- - ----~--- --- ---- -- . -- -- - ~__.n - - .- --~-- .- n___ -- - -- .- ----.-- D:I I ...... LD w - - -. - -- .-- -- ---.. -- --------- - - +-- - - .--.- -"-- -"--- -- _. - -- ---- -' - ---- - -- ---- ---- -- - -- - - - -- - -- -' - - - -- -- -- +- -- ~ - -- - - -- -- -- ---- -~ -- -- - - -- -' ------ - - - .. .. - ----~1 OPERATING STATEMENT PAGE 3 ~ BY PROGRAM PERIOD ENDING 830331 REP 109 ~ - -- --- - - - --- . E X PEN D I T U RES REV E N U E ~~a=a~=~==~c=====~=~===~=;~===;==~===_=~_~====~~===~~ =~~~=a==~~~===~=~=:========a~~=====c=~= M-T-P Y-T-D Yo FUNDS M-T-D Y-T-D X BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD ==_;::c':c:I G==ac=a:: _~&I=llDa :I'I:iI= ===cn::uz:=ZI= -- - - ====-== - - --:c::=c;::ta---- =a=IS';Ii= - ~==I:l -~---- WATER RESOURCE - WATERFRONT =C=~Q~g;==GQ==~g====~==_=~G ADMINISTRATION-WATERFRONT 211,239 16,489 45, 129 21 4 166, 110 211,239 0 CAPITAL DEVELOPMENT 1.~31,261 20,3~1 84,4~4 5 5 1,446,807 1, 531,261 300- 300- 0 -~-' --- ~--- ~ 01 SHORELINE MANAQEMENT :182,500 671 1,855 3 580,645 582,500 0 MAINTENANCE 0 0 -------------------------------------- -~------------ --------------------------------------- TOTAL 2,325,000 37,511 131, 437 5 ., 2,193,563 --- - 2,325,000 -- ~OO-- - 300- 0 ----------------------------------- ----~------------ --------------------------------------- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL - - -- ~ - - - - -- -- -- - ---- -- - ~- , -- -- -- - --- - - _________ __ _____u_____ ~~ - --- -- - - - -- ---- - -- - -- --- -- ! - - - --- -- ---.--- -------- - -- ---- --- -- - -- --- --- --- -- -- - 0 - ---- --- - ---- ~---- - .- -- - --- ...... B-lss - 2 - g;I:l~~~~~~~~ Erosion Control - Metro Major remedial works haveoeen completed, at the wynford Keights Crescent site in the City of North York. Private revenues, in the amount of $27,900.00, which were received this year but not included in the budget figure are reflected in the overall expenditure for this activity Major work at Beaucourt Road and Delroy Drive are scheduled for later this year. Erosion Control - peel Remedial work at Albert Street in Bolton is scheduled for later this year. Erosion Control - York Remedial works at Kirby Side Road have been completed. Private revenues, in the amount of $1,400.00 which were received this year but not included in the budget figure are reflected in the overall expenditures for this activity ~mwI~ Major maintenance in Lower Humber Channels and the Palgrave Dam is scheduled for later this year Regular maintenance of our water control structures has been carried out within the established budget guidelines. ~~~g=~~~J;Mt=~~g Remedial Works Channel improvement works have been in progress on the Main Branch of the Rumber River in Bolton. The major part of the heavy construction has been completed. Final grading, cleanup and restoration should be completed by the end 0 f June, 1983 Preparation of the final design drawinqs and tender documents for Phase II of the Bolton Project is in progress. Keating Channel Study The Keating Channel Environmental Assessment report has been received and forwarded to the Ministry of Natural Resources and the Municipality of Metropolitan Toronto for their review and approval prior to formal submission to the Ministry of the Environment. Environmental Planning Environmental Inventory reports for the erosion control program were drafted A literature review and mapping exercise of aquifers and groundwater systems in Uxbridge area was completed A start on the collection of backqround data for input into master drainage planning has been initiated Master drainage planning will be a major activity throughout 1983. /3 . B-ls6 - 3 - ~~~~~~~~~ Colonel Samuel Bo.is. Smi.th Waterfront Area - The base for the entrance road was completed and a contract has been awarded for paving - The control equipment has been ordered for use in the revenue collection system and the site should be ready to start filling by June 1, 1983 - Plans for the staging of landfilling operations are being prepared for approval by the Ministry of the Environment - Names on the waiting list for moorings now totals 63 - The Borough of Etobicoke, Humber College and the Ministry of Government Services are all involved in a planning review of the future of the Lakeshore Psychiatric Hospital Humber Bay West - A contract for paving the expanded parking lot adjacent to the boat launching ramps has now been awarded - The Boating Clubs are proceeding with preparations for additional landscaping in 1983 Both Clubs are developing plans for Club House construction - The Mimico Cruising Club is developing a dinghy sailing facility and a service dock - Plans for an Official Opening of Humber Bay West Phase II in 1983 are underway Aquatic Park - The Ministry of Natural Resources is negotiating a lease to the Toronto Harbour Commissioners for an area large enough to complete the endikement and place final armouring on all headlands The Toronto Harbour Commissioners will be doing the armouring with funding from revenues from the fill operation - The Authority has established the "Aquatic Park Planning Task Force" to reactivate planning of future recreational use of the Leslie Street Spit and the endikement Bluffers Toplands - The demolition of the former filtration plant on Fishleigh Drive is nearing completion and the plans for restoration and grading have been completed - Plans are being reviewed for the proposed development of the former Seminary lands in an effort to address some of the concerns of local residents Bluffers Park - Preparations for spring planting on the easterly parts of Phase II were completed - Plans for paving the easterly road extension and the public parking lot are being completed /4 B-1S 7 - 4 - Bluffers p-ark c.Cont'dl - All four boat clubs have ambitious development programs planned for early implementation - The master plan amendment which proposes a marina facility on the westerly side of the boat basin has been approved by Metropolitan Toronto and will soon be dealt with by the Borough of Etobicoke East Point P-ark - Detailed planning for excavation and grading as well as site servicing is underway. Ajax Waterfront - A detailed planting plan has been finalized and work is scheduled to commence in several areas by May l, 1983 Shoreline Management - Property negotiations are being completed in preparation for shoreline protection at Lakehurst Crescent. - A project for erosion control in Bellamy Ravine was prepared - An erosion problem at the west end of Scarborough Bluffs adjacent to Fallingbrook Drive is under review and will require remedial works this year Environmental Monitoring - The results of the 1982 waterfront monitoring program are being compiled in report form. - During the first quarter of this year, the automatic temperature recorders monitoring the lake trout shoals at Bluffers Park were retrieved. The success of the over-wintering eggs will be investigated through diver examination in the near future - Initial planning for the 1983 field season is underway, including discussion with the Ministry of the Environment concerning the monitoring agreement requirements for the Colonel Samuel 80is Smith Waterfront Area. Imd - 'lO: THE CHAIRMAN AND MEMBERS OF 'TIlE EXECUl'IVE CXM1ITl'EE, M.T R.C.A., - I 9"83 PAGE I OJ I f-' FRa1: JOHN W MALEI'ICH, MANAGER, DEVEWFMENl' CCNI'OOL SECrION ~ RE Aa-illlISTRATION OF ONTARIO REGUIATICN 170 - ~ & DEX::EMBER, 1982 AND JANUARY - MAOCH, 1983 ENF OFF. LOCATION DETAILS OF VIOLATION NOTICE ThIITIALS ACTION TAKEN Borough of Scarborough V-478, Mr William Wai LelIDg Chan -Fill ReIroved. lDt 165, Plan M-440 tbventJer 22, 1982 00 -Area Restored and Seeded. #32 ~liffe Drive 3(b) Waterfront V-4 79, Victoria Const. Ltd November 22, 1982 3(b) ToNn of Markham V-480, Frederick & Lillian -Filling Stopped. Part lDt 14, Concession 4 Pinarello 00 -Restoration to be urrlertaken #7 Buttonville Crescent East November 24, 1982 in Spring of 1983 Ibuge River Watershed 3(b) City of Mississauga V-481, Joseph Kaufnan Enterprises -This matter is before the Courts. -Trial date is set at May 20, 1983. Part lDt 1, Concession 1, S.O.S. (The Kitchen Centre) lWl -Provincial Court (Criminal Division) #2050 Durrlas Street East Decenber 1, 1982 424 llensall Ci=le, MISSISSlIUGA, Ct1t. Etobicoke Creek Watershed 3(b) City of Brampton V-482, Ketherine Hluszko -cMner has been made aware of the Part lDt 17, Concession 8 Decenber 7, 1982 lWl Authority's concenLS SOuth side of 17th Sideroad 3(c) -No further interference activity has HlID1ber River Watershed been tmdertaken. City of North York V-483, Mr D. Kern -Filling stopped. lDt 24, Plan M-754 December 14, 1982 [1>1 -Material to be renoved as soon as Rear of #4 Page Avenue 3(b) weather penni t.s Don River \'latershed V-4a4, Davmark DeveloflIel1ts ~l~ 14, 1982 3(b) /L 1983.03 31 '10: THE CHA.IRMAN lIND MEMBERS OF THE EXEXl1l'IVE a::t-lMITrnE, M.T.R.C.A.., - . ~83 PAGE II FOCM: JOIlNW MALEl'1CH, MANAGER, DEVEUlIMENl' <XNl'RlL SECl'IW. RE: AIMrNISTRATIW OF CNl7\RIO RmJIA'l'IW 170 - NJJE:.IBER & DEUMBER, 1982 AND J1\WARY - MARCIl, 1983- DETAILS OF VIOLATION NOTICE ENF.OFF ACTION TAKEN LOCATION INITIAIS City of North York V-485, Jack Greedy Limited -FilliD] stepped. lot 24, Plan M-754 December 15, 1982 l>>t -f4aterial to be raroved as soon as Rear of 14 Page Avenue 3(b) weather permits. Don River Watershed TcM1 of Ri.chnqd. Hill V-486, Ade Kushnaro lDt 3, Plan 65M-2078 January 19, 1983 >>I -Mr. Kustmaro is na.t aware of the Authority's Don River Watershed 3(b) oonc:enl5. -No further activity has been tmiertaken. To.m of PickeriD] V-487, Stanley & Daris Callaghan -Alteration st:.owed. N. Pt. lot 13, Con. 6 February ll, 1983 D'l -court action by MNR, wder the Lakes and Duffin Creek Watershed 3(c) Rivers Inprovaoont Act. V-488, Don ~ers Construction -Enforcement staff participating in Court February 11, 1983, 3(c) action. TcM1 of Caledoo V-430, Jaffre Bellc:hanber -charges ~e laid and the trial date was Pt. lot 9, Cancessioo 6 April 26, 1982 PM tt:lvaltler 12, 1982, Provincial Court 191 Sackville Street (Boltal) 3 (a) and (b) (Criminal Division)424 IIensall Circle, MISS 'HlIIber River Watershed -A conviction was registered - fine of $250.00 plus renDVal of the offenclinJ uaterial waS ordered by the Court. Fill na.t renoved. - City of Mississauga Pacific PaviD] Ltd. l\H -charges laid Ck:t:QJer 29th, 1982. 15845 4th Line East Etcbicoke Creek Watershed 3(b) ~ 7, 1983: Calvicted and Fill OJsl;1ered Iewved. , /.L. 1983.03.31 b:I I I-' VI \D B-160 TO The Chairman and Membp.rs of the Executive Committee, M.T R.C A , Meeting Jl6/83 - Wednesc9ay, May 4, 1983 FROM T E Barber, Administrator, Information and Ec9ucation Division RE INFORMATION AND EDUCATION DIVTSION - PROGRES~ REPORT January 1 - March 31, 1983 CONSERVATION INFORMATION SECTION The Conservation Information Section carries out the Authority's general information program, as well as programs relating to the resource management activities and the marketing of the Authority's revenue generating facilities - Black Creek Pioneer Village, the Kortright Centre for Conservation and the Conservation Areas COMMUNITY RELATIONS - INFORMATION - GENERAL Printing Highlights - the Authori ty' s 1982 Annual Report was printed and is currently being distributed - the 1983 Directory has been prepared and will be pri n ted later in April - distribution of the Authority's general brochure and the 1983 Calennar of Events anc' Activities (Winter and Spring) has taken place, as scheduled - news ann photo releases were printec' and distributed, regarding the }\uthority's 27th Annual. Inaugural Meeting, the Budget Meeting, appoint- ment of .the new Chairman, the Canada/Ontario Employment Development Program ann the signing of the cooperative agreement be~ween the Authority and the Board of F::c'lucation for the Borough of Etobicoke Tours and Spec-ial Days - staff organized and carried out arrangements for a) the 27th Annual Inaugural Meeting at the City of North York, on Friday, February 11th b) the Ceremonial Aqreement Signing at the Half Way House, Black Creek Pioneer Village, on Wednesday, March 23th - preliminary arrangements were underway for the Authority's Sugaring Off Party, for members ann staff, to be held at the Kortright Centre, on Saturday, Apri 1 9th Special Programs - staff attended the launching of the Sesquicentennial at the King Edward Hotel, on Monday, March 28th - staff spent extensive time working with the Foundation on the Annual Report ann the special fund-raising campaign for the Visitors Centre AudiO-Visual Highliqhts - sline show for presentation at the 27th Annual Inaugural Meeting - the Watershed Pl.an audio-visual presentation was set up and shown on a number of occasions during the first three months, including the Information Seminar for new members, on Tuesday, February 22nd Staff also soent consioerable time on an audio-visual presentation on the 1983 buoget, shown to new members on the same date - audio-visual presentation on the Authority's budget was prepared and shown at t~e Budget Meeting, on February 25th B-16l - 2 - COMMUNITY RELATION~ - INFORMATION - RESOURCE MANAGEMENT Printing Highlights: - revisions have been complete~ for both the Valley and Stream Regulations and the Waterfront Regulations and French translations are now available. Printing will be completed by the end of April. _ staff members are preparing a synopsis of the Environmentally Significant Areas. This publication will eventually be available to those interested in the Study. COMMUNITY RELATIONS - INFORMATION - PLANNING/MARKETING Printing Hiqhlig~ts: _ slight revisions were maoe to the Black Creek Pioneer Village brochure and 250,000 copies ~ave been printed. Distribution is underway. _ the artwork for the new Conservation Area map was completed at the conclusion of 1982. The design was developed, tn January, for side 2. Staff spent considerable time on the written material and in the selection of the photographs. The map has been printed (75,000 copies) and distribution will commence in April. _ the Black Creek Pioneer Village Walkaround Tabloid was updated ann will be rea~y for printing in April - the posters promoting Black Creek, Kortright and the Conservation Areas have proven to be very popular, as distribution continues throughout the watershed. Mr. Willis Blair, Chairman of the Liquor Licence Board of Ontario, recently approved a program to display the Black Creek poster in all the Metropolitan Toronto stores during the month of July, and the Kortright poster during September. _ Brochures Unlimiten has been contracted to distribute the Black Creek, Kortright ann Conservation Area brochures throughout the Metropolitan Toronto region, as well as throughout the Niagara Penn insula in the case of the Black Creek and Kortright brochures - preliminary work has been completed for an enclosure that will be sent out with the City of North York's water bills, commencing in Hay, for the next 26 weeks (200,000 copies) - a number of other municipalities have shown interest in participating in the same type of program - staff prepared and distrlbute~ 12 news releases, 6 photo releases, 12 synopses and 12 fIvers, i~entifying and promoting programs at the Village, Kortright and the Conservation Areas - staff designed a Black Creek Pioneer Village promotion that will be imprinted on Miracle Food Mart grocery bags. Distribution will take place during the second and third weeks of May. - the Authority subscribes to the MacLean Hunter Press Clipping Service and, for the first three months of the year, received approximate~y 720 press clips, which is only a sample of the coverage the Authority receives. A survey was done on the Toronto Star clippings for 1982 and it was estimated that if the publicity given to this Authority had been paid advertising, the cost would have been in excess of $540,000. Special Programs - a special exhibit of the works of Glen Loates was arranged at the Kortright Centre, between February 4th and March 6th. This program was made possible with the cooperation of the Ministry of Natural Resources. Staff worked on publicity, program and a special Minister's reception which took place on Thursday, February 3rd - arrangements were also ma~e for an exhibit of the works of Frank de Matteis at Kortright. This wildlife art show was on display between March 11th and APril 4t~. A pUblic/media reception was held on Thursday, March 10th. B-162 - 3 - - numerous opportunities have come up this year, for the Authority to part icipa te in special coupon discounting for admi ttance to Black Creek - Dominion Stores, Holiday Inns, Travel Marketing Promotions, Federal Off i ce of Tourism ann the City of North York (also includes Kortright) - staff. attends regular meetings of the Attractions Council of the Metropolitan Toronto Convenrion and Visitors Association - staff worked with Harry McDougall of the Toronto Star, with respect to special articles featuring Kortright, Black Creek and Bruce's Mill - considerable work went into ~eveJoping the Communications Strategy for the 1983 Marketing Plan - all of the Recommennations for Immediate Action and Short-term Action, as recommend en in the Woods Gordon Marketing Plan, have been carried out, ei tner completely or in pa r t - initiaten a telephone answering sales program on evenings, weekends and holidays This is a staff operated telephone answering service that was implementer:l on March lqth, for a trial period of three months - Teleguide units have been in place at Black Creek Pioneer Village since October The units will be installed shortly at Kortright and Indian Line Tourist ~ampground The Authority has 15 pages of information on tne system and there are presently 290 units in the Metropolitan Toronto region - tne Canada/Ontario Employment Development Program will provide for supplementary marketing activities, including distribution of literature, staffing of exhibits and information booths and monitoring visitor trends - the multilingual television sration, Channel 47, will be running a 13-week promotion on the Authority's recreational facilities, beginning in early June - the word processing equipment is now ready for use in the Conservation Information Section Aunio-Visual Highlights - a new 60-'second, colour, television spot announcement, on the artisans at BJark Creek Pioneer Village, is nearing completion This will be distributen to Ontario's television stations in June - winter ann spring television promotions were sent to all the Southern On t a ri 0 television stations, promoting Black Creek, Kortright and the Conservation Areas - arrangements were made and exhibits were set up at the Camping on Wheels show and the Canadian National Sportsmen's Snow Advertisinq and Promotion - arranged for special publ iei ty features with a) Ontario Crafts Council - 0ntario Craft Magazine b) Feneration of Ontario Naturalists - Seasons c) Canada Century Home d) Canada's Wonderland - Around Canada's Wonderland e) Region of York - York Region Travel Guide f) Metropolitan Toronto Convention and Visitors Association - Happenings, Guide Map, Discovery Guide CONSERVATION EDUCATION SECTION Kortright Centre for Conservation - attendance for the first quarter of 1983 was 23,700 visitors, up 2,000 from the same period of 1982 - during this quarter two well known wildlife artists (Glen Loates and Frank de Matteis) held very successful exhibitions of their works in the Centre - there was a wide variety of programs attractive to all ages and interests, including Winter Wildlife, Owl Prowls, Maple Syrup Demonstrations, Nature Photography, "Snow Snakes", Man and Wildlife Habitat, Ground Hog Day and Workshops for Building Bird Houses and for Making and Flying Kites 4 B-163 - 4 - - some of the special events taking place at the Centre were several professional Development Day programs for teachers, an Ontario Professio~al Forestry Association dinner, a M N R. luncheon, meetings of the Boy Scouts Association, the Cancer Society, the Bindertwine Association, an APEO rabies seminar and a special evening program for Kortright members - thanks to a variety of government sponsored labour-intensive programs and funds raised by the Foundation and from ~arious Ministries, several develop- ment projects will be completed this year Forestry Trail, Land Theme Building, Fisheries Project, Water Theme Exhibit Area, plan and design for the exhibit and trail program, seating for the theatre - in addition, Kortright's participation in the C O.E.D. program will provide labour and materials to complete the gatehouse, enlarge the bee space, carry out major repairs to the barn, cultivate and plant several fields in conjunction with the Land Theme program, and upgrade the Centre to the required maintenance level, as well as several other smaller projects - the Renewable Energy Theme is well underway, with the detailed plan of outdoor development expected to be completed in May and an official opening of the entire program scheduled on arrival of the windmill (currently being tested in Prince Edward Island); the audio visual component of the energy program has also been acquired and is in place, and the indo9r exhibit component is well underway - the Landplan Collaborative Ltd. is making the final adjustments to its plan of the central core area, with implementation expected to be started in the first half of this year - includes an extension to the present indoor eating facilities, an enclosed patio eating area, additional parking space and an activity/playground/holding area in conjunction with the student group programs Day Programs - in addition to resource management programs at Cold Creek, a resource planning project-type program is almost ready for marketing to school groups, along with rifle/trap/archery range programs which are being updated and reorganized - all in-depth programs for intermediate and senior students - at Black Creek Pioneer Village, the Pioneer Life Program continues to be just as much in demand as ever; the Tour Programs are getting underway for the spring season; plans are well along for a-"summer discovery" program in cooperation with York university, during weekday afternoons in July - the Maple Syrup Program at Bruce's Mill was again fully booked this year, with students largely from the primary and junior grade level; the staff is studying the possibility of relocating the trail and some of the demonstrations, with the assistance of the C ..0 E. D program Residential Programs - despite decreasing enrolment and less demand for weekend use on the part of the schools, the Centres are still maintaining their 90% occupancy due to other types of groups making use of the facilities - among the special groups using the Centres were a multi-cultural group of Etobicoke senior students, a variety of church and youth groups, the Bruce Trail Association, Peel Regional Police Leadership Forum, several groups of guides and brownies, a number of private school and college groups and groups from the Metro Toronto Schools for the retarded - several in-house and Authority related committee meetings and staff seminars were held at the various Centres - Faculty of Education, University of Toronto continues to participate in the programs for practice teaching purposes - the C O.E.D program will provide labour and materials for renovation of the dormitory, partial renovation of the kitchen and the addition of a mud room, plus several other smaller projects, at the Albion Hills Conservation Field Centre; and for barn renovations, pedestrian walkways and landscaping, kitchen expansion, construction of decks on the dormitories, dock and beach centre, and several other projects at the Lake St. George Conservation Field Centre .5. B-164 - 5 - Lease-Agreement between The Etobicoke Board of Education and The Metropolitan Toronto and Region Conservation Authority - a "signing ceremony" was held at Black Creek Pioneer Village on Wednesday, March 23, 1983, to formally announce the Lease-Agreement between The Board of Education for the Borough of Etobicoke and The Metrolopitan Toronto and Region Conservation Authority, to construct a residential centre for the Board, in conjunction with the Authority's Albion Hills Conservation Field Centre The new centre (Etobicoke Environmental Education Centre) will accommodate about 70 students and accompanying staff, and will be used primarily by the Board's Grade 6 students on a year-round basis Construction is to begin almost immediately, with completion scheduled for the end of 1983 FINANCIAL COMMENTS All expenditures and revenues appear to be on target While it is not reported on the attached financial summary, the 1983 budget for the Renewable Energy Program at Kortright is $183,493, of which $33,173 has been spent to-date (18%) and $150,320 is available to the end of the current agreement between the Authority and the Ministry of Natural Resources (March of 1984) TEB/mrp 1983 04 26 BY PROGHAM .....1".__ _.".,.,,,_ ______ J E X PEN D I T U RES REV E N U E =~~;=~==~~~===~~~~==~=~=~ ====;=~;===-== ====;~=====; ~~==~~====~m=cc===~~==~=======~~=~~=>>~= /1-T-D Y-T-D 1{ FUNDS I1-T-D Y-T-D 1{ BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTU~L ~ECD i ==~;:== =-;;;=-==:;s: =~=z::;o;::;.. ",r", =:a;;=cz:;l=C==: C;:~===III C:=ClIi:U::lIiI3: ;;;:==::U:IIG ;:::;=:= INFORMATION ~ EDUCATION =====;~~c======_======= ADMINISTRATION - I & E 415.370 32.787 92.318 22 2 323.052 415.370 0 COMMUNITY RELATIONS - INFORMA 80. 127 232 4.431 5 5 75.696 BO. 127 0 -- COMMUNITY RELATIONS - INFORMA 1 L 000 0 11. 000 11 . 000 0 COMMUNITY RELATIONS - INFORMA 90.243 2.313 9.772 10 8 80.471 90.243 0 FIELD CENTRE - OPERATIONS 1.273.083 99.564 241.573 19 0 1.031.510 1. 266.0B3 74! ~7~- 233. 182- 18 4 - - --- KORTRIGIH 442.000 42.920 11 L 400 2~ 2 330.600 441.384 ~1,890- 79. B02- IB 1 CONSERVATION EDUCATION-DEVELO 0 92.500 0 .-----. - - -. -------.--------.-- -------- ---------- ----~----------- --------------------------------------- TOTAL 2.311.823 177,816 459,494 19.9 1,852,329 2.396.707 126,563 312.984- 13 5 ---------------- ------- ---------- ---------------- --------------------------------------- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL .- ------- - --- .- -- ----.. ._- KORTRIGHT - RENEWABLE ENERGY PROGRAM 183,493 33,173 150,320 -- - --------.-----"- - .- ------ .- W I r- (J\ II> ___0. -- - - -- - ---------------- "--- ----- ------ B-166 TO The Chairman and Members of the Executive Committee, M T R C A - Meeting #6/83 FRDM P B Flood, Administrator Conservation Land Management Division RE Conservation Land Management Division PROGRESS REPORT ----------------------------------------------------------------------- PROGRAM ADMINISTRATION The primary use of administrative staff during the early part of this year has been in continuing existing and developing new employment programs During the past year, the division has received considerable assistance for various programs through 12 individual Provincial and Federal Government special employment programs The variety of programs and the works accomplished are indicated in the various programs of the Division The largest single project presently underway, the COED (Canada Ontario Employment Development) program will provide the Division with approximately $820,000 to hire 57 employees in a variety of jobs for a period of up to 52 weeks WATERSHED RECREATION - PLANNING The planning priority for 1983 is the Boyd Master Planning Study To date Phase I and part of Phase II of the planning process have been completed On February 17, the Authority hosted an information centre to provide the general public, interest groups and government agencies with an opportunity to review and comment on the progress and direction of the study This was a very successful meeting with well over 80 people in attendance At the present time, the study team is evaluating the economic, environmental and technical feasibility of a number of development ideas for the Area When this analysis is complete, alternative concept plans will be prepared These plans will be presented to the public at a second open house sometime late in May In addition to the Boyd Study, staff has been involved in reviewing and finalizing plans and specifications for this year's major development projects the Albion Hills washroom building and picnic shelter and the Indian Line campground supervisor's residence and laundramat This information is to be forwarded to the Minister for technical approval late in April Tender documents are currently being prepared A draftsperson has been hired under the COED program to assist with the preparation of technical drawings for the major maintenance projects to be carried out in 1983 Two such plans have been completed After several meetings to discuss the impacts of the proposed Highway 50 realignment on the Claireville Area, MTC has agreed to pay the Authority, in addition to a property settlement, $40,000 to buffer plant the affected area WATERSHED RECREATION - DEVELOPMENT The two year program to assist disabled persons visiting Conservation Areas and Forest and Wildlife Areas ended March 31 Projects completed in 1983 at a total cost of $13,170 included installation of unistone pathways into and around the trap range building at Cold Creek, construction of a drop off area and path system to the Beach area at Bruce's Mill, improved parking at both of the above Areas and provision of exterior shower facilities in the pool area at Petticoat Creek Work on the new entrance road into the Indian Line Campground continued in 1983 MTC is scheduled to complete the paving contract for this intersection on or before May 15 Under the COED program, the Authority will extend road curbs to the turning circle, install a unistone pathway around the proposed supervisor's residence and gatehouse and replace landscape plantings lost as a result of the Finch Avenue extension B-l67 PR06RESS REPORT PAGE 2 The COED program will also provide labour and materials to - repair the rifle range building at Cold Creek and the refreshment booths at Greenwood and Claireville; - construct a new fish rearing pond at Glen Haffy and office space and refreshment facilities at Cold Creek, and - replace the footings/piers under the grist mill at Bruce's Mill Already people have been hired to upgrade and standardize the signage in all areas as well as paint the exterior and interiors of a number of Authority buildings. A proposal has also been submitted under the Provincial Parks and Conservation Areas Work Sector program If approved, this program will enable the Authority to develop an equestrian/snowmobile trail at Claireville and carry out further restoration work on the grist mill at Bruce's Hill. WATERSHED RECREATION - OPERATIONS During the first quarter of 1983, the usual 6 Conservation and 2 Forest and Wildlife Areas were open for public use Due to the abnormal lack of snow normal winter recreation activities were not possible The Albion Hills and Bruce's Mill ski programs were able to offer limited facilities on 3 and 2 weekends respectively Only 5 groups at Albion Hills and 2 groups at Bruce's Mill were able to participate in the instructional program. In an effort to reduce costs ski staff were released early None of the scheduled winter Special Events were held The monthly Retriever Trials commenced in March at both Claireville and Cold Creek. The Bruce's Mill Maple Syrup Demonstration began the first weekend of March, a week earlier than usual. Bookings for the school tour program increase~ over previous years with tours commencing mid-March Staff are undertaking a complete review of the Demonstration program for both public and school tours as well as the physical layout to ensure that it is up to date with current industry trends. During January, the annual delivery of Q5,000 Rainbow Trout fry was received at the Glen Haffy hatchery This fish will provide the "Put and Take" stocking supply for the Glen Haff~ ponds, Heart Lake and other Areas in 198Q The lack of winter recreation activity permitted Area staff to carry out more than the usual amount of routine maintenance and repairs to buildings, grounds and facilities This work was augmented by 2 Special Employment programs At Bruce's Hill, 2 young workers were employed under the Winter Experience Program to assist with maintenance and program preparations At Claireville/Heart Lake and Boyd Areas, 2 3-man crews started work under the 1983 Canada Community Development Program (CCDP) These workers assisted with building and picnic table cleaning and painting and also accomplished considerable landscape tree pruning in picnic areas This program will continue throughout the summer and will be expanded to other Areas Under the Authority's COED program, 10 workers have been identified to assist Conservation Area staff with regular operations and maintenance. These additional workers will assist in upgrading maintenance standards to levels in previous years A crew of 3 workers is being provided to work at Indian Line Campground to carry out new planting and to maintain all plantings They will also assist in all ground maintenance work at the campground At Cold Creek, 23 people attended the first Hunter Education Course conducted by the Area Superintendent In response to demand, section staff, in consultation with I&E Division staff, have begun work on revamping the Shooting Skills Program for school groups B168 PROGRESS REPORT PAGE 3 During this period, Sporting Clubs have used the ranges for 2 "Ham Shoot" competitions A permit has been issued to the Upper Canada Rifle Association for a monthly event on the rifle range The Superintendent and other section staff have been actively involved in preparing for a summer special Event Day and a major Dog Show in October The Superintendent has participated in a radio interview and brochure distribution to sports stroes to promote the Area During the winter, Petticoat Creek staff have again carried out the annual inventory of all Authority vehicles and equipment and the annual inventory for the Land Management Division of all Area tools, equipment and furnishings Division staff have devoted considerable time to preparation and processing of Tenders for the Authority's acquisition of replacement vehicles, tractors and equipment During this period, Division staff organized a training seminar on Chainsaw maintenance and safe "felling" techniques This program sponsored by the Ontario Pulp and Paper Makers Safety Association was attended by staff from various Authority locations and has been very favourably received by all attending It is a valuable addition to the Authority safety program A tractor maintenance seminar sponsored by the Ford Motor Company was held for operating staff involved in tractor operation Two Conservation Area supervisors and the Safety Officer attended the MNR Enforcement Course and successfully passed the test requirements They will be eligible for future appointment as Provincial Offences Officers to enforce the Authority's Conservation Area Regulations Division staff have been actively involved in promoting Area recreation facilities by staffing displays at the Camping on Wheels and the Canadian National Sportsmens Shows Emphasis in both displays was on Conservation Area recreation facilities Revisions have been completed and updated information pamphlets printed for campground operations, boating programs and range operation Copy for the individual Area brochures has been revised in preparation for printing for Spring distribution Considerable input was provided by Division staff into the preparation of the new "Conservation Areas Brochure" In preparation for the upcoming summer, staff hiring is well underway The new public boating program for Heart Lake has been established and staff are reviewing a request for a sail boarding concession The Claireville canoe instruction program has been revised to reduce operating costs The following table shows Area attendance for the period January 3 to March 27, 1983 It shows a decrease of 66,864 people or 64 2% over the same period in 1982 reflecting the serious impact of the lack of snow on Area operations ATTENDANCE AT CONSERVATION AREAS, JANUARY TO MARCH 1983 1983 1982 ALBION HILLS 6,195 38,333 BOYD 3,071 6,905 BRUCE'S MILL 13,813 25,479 CLAIREVILLE 4,886 6,094 COLD CREEK 6,086 6,240 GREENWOOD 1,691 6,155 HEART LAKE 709 3,758 PALGRAVE ~ 9,509 37,205 104,069 PROGRESS REPORT B-16g PAGE 4 CONSERVATION LAND MANAGEMENT PROGRAM Job creation programs funded by the Federal and Provincial Governments have enabled the Authority to accelerate resource management projects on Authority, public and privately owned lands within the watershed On Authority owned lands, staff hired under the Canada Community Development Program and the Parks Work Sector Program carried out woodlot and plantation management programs in the following locations Bolton Resource Management Tract (201 cU.m /56 cords of firewood), Glen Haffy Forest and Wildlife Area (432 cu m./120 cords of pulpwood and 1600 meters of fireguard maintenance); Glen Major Resource Management Tract (1500 meters of firegaurd development). The Bruce's Mill Conservation Area produced 45 cu.m./12 cords of firewood this past winter. As part of the COED program, 5 staff will continue woodlot and plantation management on Authority lands starting in early May. Under the Fisheries Work Sector Program, which started in the fall of 1982, staff developed and posted 8 km. of fishing trails in the Bolton Resource Management Tract and 4 km in the Claremont Forest and Wildlife Area. Six fishing piers were also constructed for the Claireville Conservation Area. Additional stream improvement projects for 1983 include 540m of fisheries rehabilitation on the Duffin Creek and 800m on the Humber River. The Authority will be involved in the Experience '83 Conservation Services Sub-Program again this year and it is anticipated that 400m of stream improvement works will be initiated on the Humber River The Authority will also be working with Save Our Streams, an organization which is interested in conducting fisheries projects on Authority lands. To date, one major proposal hs been received for works on the Duffin Creek in the Claremont Forest and Wildlife Area. Reforestation projects are underway on Authority lands with 50,000 . seedlings scheduled for the Glen Major Resource Management Tract, 6,000 at the Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and Wildlife Area Boy Scout groups will also be planting 10,000 seedlings at the Bolton Resource Management Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd Conservation Area, and 10,000 at the Glen Major Resource Management Tract Planning projects for resource management programs on Authority owned lands have included the completion of fire suppression plans for plantations in Goodwood and Glen Major Resource Management Tracts, and the Claremont and Greenwood Forest and Wildlife Areas Forest management plans are being prepared for the Albion Hills Conservation Area, Palgrave Forest and Wildlife Area and the Glen Major Resource Management Tract Under the Forestry Stimulation Work Sector Program, plantation management projects will be undertaken later in the year at the Glen Major and Goodwood Resource Management Tracts and the Claremont Forest and Wildlife Area Management Plans have been completed for the Bolton, Nashville, Ebenezer and Glen Major Resource Management Tracts Resource management plan preparation will continue throughout 1983 for Resource Management Tracts, Forest and Wildlife Areas and Conservation Areas These plans will also include Environmentally Significant Area management plans . A stream report summary has been completed which identified the success of stream improvement projects carried out since the program began in 1962 Since that time, 34,000 meters of stream have been improved In addition, stream assessment projects and monitoring programs will be carried out under the COED program in 1983 Agricultural rental reviews have been carried out on five Authority lands to date in 1983 B-170 PROGRESS REPORT PAGE 5 Under the 1983 Parks Work Sector program, fencing projects have been proposed for a number of Conservation Areas and Resource Management Tracts The approval of the Parks program is pending Staff are also working with Ducks Unlimited to determine the feasibility of developing waterfowl habitats at the mouth of the Duffin Creek and in the headwaters of the Humber River Under the Private Lands Assistance Programs, 63 site visits have been carried out to date to provide technical advice on tree planting programs', pond advice and urban wildlife Tree planting programs are underway and approximately 30,000 reforestation trees will be planted for 12 private landowners this spring 13,500 wildlife shrubs and 2,500 trees will be planted under the Urban Wildlife and Tree and Shrub Planting Programs for 44 landowners Two requests have been received for reforestation subsidies (4,000 trees) One Conservation Plan has been completed with four applications on file To date, 34 Conservation Plans have been completed for private landowners Two requests are on file for the Authority tree spade rental program this spring The tree spade is also busy again this spring preparing caliper tree stock for landscape projects Planning activities for private lands programs include continuing inventory of past assistance programs, a land use review of major watersheds to priorize project locations throughout the watershed and a coninued agriculture land use review A new program of ESA management for private landowners will be finalized during 1983 Promotion for Services Programs has included to date the circulation to cable T V outlets a video tape of the Conservation Services slide presentation and news releases for various assistance programs A slide presentation on the Density Bonus program will be completed in the near future Staff will be participating in landowner days at the Kortright Centre Inventories have been completed for 90% of the primary and seconda.ry watercourses within Metro Toronto and surrounding municipalities under the Winter Experience programs for the Authority's new Urban Management program Three planting projects are underway for the Rouge and .- Highland Creeks and the Don River Two hundred and ninety-five trees and 1,300 wildlife shrubs will be planted Plantings will also be carried out for the City of Brampton with 4,450 seedlings, 100 trees and 1390 shrubs being established Six additional sites are scheduled for the fall under the COED program Also under the COED program, ESA management plans will be developed for sites in urban areas Landscape projects and tree maintenance will be carried out by Conservation Services staff along with COED employees on a number of Waterfront development projects which include Humber Bay West, Ajax Waterfront Area, Bluffers East and Marie Curtis A total of 510 caliper trees and 4,500 shrubs will be planted and major hydro seeding projects will be undertaken .. Site rehabilitation will continue at the South Thackeray Sanitary Landfill Site in conjunction with an intensive tree maintenance program Landscape projects are also scheduled for the Bo 1 ton Channelization project, Frenchman's Ba y and two yacht clubs utilizing waterfront parks (Bluffers, Humber Bay East) The Authority nursery program will be supplying trees and shrubs to the various tree planting and landscape projects as well as to the Flood Control Section, MNR, South Lake Simcoe, and Kawartha Lakes Conservtion Authorities and Save Our Streams Under the COED program, staff will be hired to accelerate the production of plant material used on job creation projects 8-171 PROGRESS REPORT PAGE 6 FINANCIAL STATEMENT YR TO DATE ~ BUDGET EXPENDITURES EXPENDITURES BUDGET USED Administration 1611,105 673,2011 211 4 Watershed Recreation Planning 2,056 75,000 2 7 Conservation Area Development 13,171 181,960 7 2 Operations & Maintenance 426,458 2,149,000 19 8 Conservation Land Management Planning 24,1197 118,800 211 9 Conservation Management 50,385- 309,181 16 3 Fish Rearing 722 10,500 7 0 Operations - Non-Revenue 8,321 32,000 26 0 REC'D TO % BUDGET REVENUES 1982 BUDGET DATE REC'D Operations & Maintenance 1,016,000 69,372 6 8 Conservation Management 134,000 70 - FINANCIAL COMMENTS PLANNING ~ DEVELOPMENT The Boyd Master Planning Study is on schedule and within budget The Access for Disabled Program was under spent due to weather conditions and actual costs for the Petticoat Creek shower facility which were less than originally budgeted Work on the two major development projects has not begun pending technical approval from Ministry of Natural Resources CONSERVATION AREA OPERATIONS The lack of winter activity resulted in approximately $92,000 less revenue than anticipated during the first quarter Operating costs were however reduced by a similar amount due to lower utility and road maintenance costs and the employment of fewer supplementary staff CONSERVATION LAND MANAGEMENT Land Management programs for private lands assistance programs are now underway and revenues anticipated from these programs will be reflected in the next quarter Expenditures for all programs are in line for this time of year ~ B-l72 V the metropolitan toronto and region conservation authority mi'nutes EXECUTIVE COMMITTEE l6-MAY-1983 REPORT .7/83 (~l)1:''''Tll.r M1i!~"'TMt.!~ PRESENT' Chairman Mrs. F. E . Ge 11 Vice-Chairman E.V. Kolb Members W.G. Barber M.W.H. Biggar Mrs. L. Hancey H.C. Lawrie Ms. S. Nimmo J.S. Scott Mrs. N. Stoner Authority Member W.R. Herridge, Q.C. " II- Dr.. W.M. Tovell Chairman - Metropolitan Toronto P V Godfrey Chief Administrative Officer, Metro. Toronto J.P. Kruger Chairman - Peel Region R. F'. Bean Chairman - York Region Bob Forhan Chairman - Durham Region G. Herrama Asst. Deputy Minister, M.R.N. R.J. Burgar. Acting General Manager, M.T.R.C.A. W.A. McLean Secretary-Treasurer. " W.E. Jones ABSENT Members. . E. Fulton S.A. Macpherson A special meeting of th& Executive Committee was convened on Monday-l6-May-1983, commencing at 3:30 p.m. The meeting was. summoned by t;he' Chairman pursuant to Sect ion 8, sub-sections (3) and (4) of the Regulations made by The Metropolitan Toronto and Region Conservation' Authority and adopte<i by Resolution t88/75. Pursuant to Section 9 of the said Regulation, the following matters were discussed: The mandate of' the Authority, specifically its role and its function in relationship to its constituent municipalities and the Province of Ontario; .Its role in regard to flood control, education, and recreation; . The capaci ty of the. administration to respond to its mandate, particularly in regard to its' relationship with the. Authority and the. Executive Committee; .The relationship. of the Executive Committee to, the' Authority at large; .The' possibility of a more formal and thorough review and examination of the above topics. No resolution was adopted; however, there was, basic agreement that a review be requested, that a' steering committee be appointed, and'. that the. steering commi ttee' draw up terms: of refer.ence for the review.: these matters' to be considered' by the Executive Committee at Lts regular meeting:; scheduled for Wadnesday-18-May-1983. The meeting terminated at 5 35 pm., 16 May Florence Gell W.E.. Jones Cha'l rman Secretary-Treasurer WEJ/KC' ~. , B-173 the metropolitan toronto and region conservation authority minutes REPORT .8/R 1 EXECUTIVE COMMITTEE lB-MAY-1983 t8/B3 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, la-May-19B3. PRESENT Chairman Mrs. I!'.E. Gell Vice-Chairman E.V. Kolb Members W.G. Barber M.W.H. Biggar E. Fulton Mrs. L. Rancey H.C. Lawrie (E'or S.A. Macpherson) E'.J.. McKechnie Ms.. S. Nimmo J .S., Scott Mrs. N. Stoner Authority Members R.J. Crowe Dr. W.M. Tovell ABSENT' Member S.A. Macpherson MINUTES Res. H13 Moved by: Mrs. N. Stoner Seconded by: Mrs-. L. Hancey THAT the Minutes of Meeting i6/83 be approved; AND E'URTHER THAT Report t7/83, a report of a special meeting of the Executive Committee, held Monday-16-May-l9a3, be received. CARRIED. SEC'l'ION I ITEMS E'OR CONSIDERATION- 1- AUTHORITY MANDATE AND ORGANI~ATION -Review Res_ U14 Moved by:' E'. V. Kolb-. Seconded by: Mrs. L. Hancey WHEREAS the- Executive Comm'ittee- has giverr consideration' to the- work of the. A:uthority and its: relationship with it~ member' munlcipa-lities.: and the- provinc~ of Ontario; AND WHEREAS it is essential that there be strong agreement among the Authority, i t8 member municipalities, and th~ ~ovince of Ontario on the direction- in which- the Authority is' proceeding;, BE IT: RESOLVED' THAT the Executi va Commi ttee recommend ta- the' Authori ty that a review- of the Authority's, mandata' and organization' be undertaken and, in this connection, that the following action- be- taken:, THAT the Chairman and Vice-Chairman consult with the Minister of Natural Resources and the- Chairmen of The Municipality of Me,tropoli tan Toron'tO' and The Regional Municipa'l,lties: of York, Peel", and, Durham, on. the termS' of reference for the review, the: constitution,. and function- of a Steering Committee far' the review. CARRIED,. B-174 -2- SECTION II ITEMS FOR INFORMATION 2. CORRESPONDENCE Mr W A McLean, Acting General Manager, reported receipt of the following correspondence (a) Letter dated May 5, 1983, from J T Johnston, Regional Manager, Ministry of Tourism & Recreation, enclosing certificates of participation for Messrs T E Barber, R K. Cooper, and P B Flood in a recent Ministry-sponsored Senior Management Institute. Appreciation was expressed by Mr Johnston for the high calibre of the Authority's participants (b) Notice from The Association of Conservation Authorities of Ontario of The 1983 Conservation Authorities Tour to be held September 18-21 in Thunder Bay The Lakehead Region Conservation Authority must be noti fied of attendance no later than June 30 The Chairman requested that members wishing to attend contact Mr McLean (c) Letter dated May 11, 1983, to Central Region Conservation Authorities confirming telephone notification that" effective immediately, a temporary freeze has been placed on the award of all contracts in the capital and surveys and studies categories of Conservation Authorities' budgets This freeze will remain in effect from May 10, 1983 until May 27, 1983 inclusive unless otherwise notified . .this temporary freeze is necessary in anticipation of a funding constraint which is to be an- nounced shortly Contract awards which were not made prior to May 10, 1983 should no t be finalized during the above temporary freeze period " (d) Letter dated April 29, 1983, from C.W Lundy, A.M C.T , Durham Regional Clerk, having regard to the Black Creek Pioneer Village Visitor Centre, advi sing that at a meeting held April 27, 1983, Council adopted the following recommendation of the Finance Committeee "THAT the amount of $11,461.36 be deleted from the Metropolitan Toronto and Region Conservation Authority 1983 budget and that the Authori ty be advised of the Regional Policy with respect to grants. " The policy referred to is to not make payment of grants in any form except for statutory grants. (e) Letter from Keith C Norton, Minister of the Environment, accepting the Authority's withdrawal of Class EAs on Erosion and Sediment Control and On Site Flood Control, and expressing his support of its decision to amalgamate its efforts with those of The Association of Conservation Authorities of Ontario (f) Letter from the W Peechatka, Executive vice-president of the So il Conservation Society of America, concerning the Society's 38th Annual Meeting to be held July 3l-August 3 at the parkview Hilton Hotel in Hartford, Connecticut Members interested in attending were requested to contact Mr McLean 3 PERSONNEL Res HIS Moved by E. V Kolb Seconded by M W.H Biggar THAT discussion of a certain personnel matter be held in camera. CARRIED The Committee had before it a letter from Mr K G Higgs, stating tha t he is dissatisfied with the arrangements made for him in accordance with Executive Resolution #93/83 The Executive sought the advice of legal counsel, Mr John B Conlin, Q.C , who attended the meeting -3- B-17s Res B16 Moved by Mrs L Hancey Seconded by M.W H Biggar THAT the arrangements made for Mr K G Higgs in accordance with Executive Resolution #93/83 be reaffirmed; AND FURTHER THAT the Chairman be instructed to acknowledge the letter of Mr Higgs and to respond to him, inviting him to appear before the Executive Committee as soon as convenient after his discharge from hospital CARRIED 4 #527 & #531 RODD AVENUE, TOWN OF PICKERING MRS STONER introduced the following recommendation which was before Council of The Regional Municipality of Durham on May 11, 1983, but was deferred pending consideration of this Committee MR ALEX ROBERTSON represented Regional Council "AGREEMENT WITH THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY FOR USE OF 527 AND 531 RODD AVENUE, TOWN OF PICKERING (GEN.-9/83) RECOMMENDATION TO COUNCIL THAT property Management be advised that we do not wish to enter into any agreement with the Metropolitan Toronto and Region Conservation Authority for the use of the properties municipally known as numbers 527 and 531 Rodd Avenue in the Town of pickering at the proposed rental charge of $500 per month and that an extension to the present agreement be requested to provide for a 60-day notice to the tenants " Res #117 Moved by Mrs N Stoner Seconded by J S Scott THAT appropriate Authority officials attempt to negotiate a rental agreement for the properties municipally known as numbers 527 and 531 Rodd Avenue, Town of Pickering, and report back to this Committee; AND FURTHER THAT the existing agreement be extended until completion of negotiations CARRIED 5 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 , Res H18 Moved by M W H Biggar Seconded by W G Barber THAT the applications listed herein as A (1) to A(4) inclusive, be approved, subject to the conditions contained in the reports CARRIED A(l) E P Seagram Industries Limited To build gabion retaining wall and place fill , western side slope Berczy Creek, Lot 19, Concession IV, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which sha 11 form part of the perm it (a) project ItJ-24, Drawing #14, dated April 29, 1983, prepared by Bunting Wardman Limited; (b) Correspondence from Bunting Wardman Limited dated April 28, 1983 A (2) E P Seagram Industries Limited To construct three drainage swales to the Berczy Creek, west of Warden Avenue, north of Sixteenth Avenue, Part Lot 19, Conc IV, Town of Markham (Rouge River Watershed) In accordance with the following documents, which sha 11 form part of the pe rm i t (a) Project ItJ-24, Drawings #6 and 13, dated May 4, 1982, prepared by Bunting Wardman Limited; (b) Correspondence from Bunting Wardman Limited dated April 28, 1983 B-176 -4- A(3) E. P. Seagram Industries Limited To construct two drainage swales to small tributary of the Berczy Creek, Part Lot 19, Conc IV, Town of Markham (Rouge River) In accordance with the following documents and plans, which shall form part of the perm it Project #J-24, Drawings #5, 7, and 13, dated May 4, 1982, prepared by Bunting Wardman Limited A(4) Borough of Scarborough To construct new inlet structure and safety grating, Dorset Park Interceptor branch of the Highland Creek, Midland Avenue, south of Lawrence Avenue In accordance with the following documents and plans, which shall form part of the perm i t Drawing #4409-1, 4409-2, and 4409-3, prepared by the Borough of Scarborough, and dated April, 1983. 6 PALGRA VE DAM, HUMBER RIVER WATERSHED -Major Maintenance Res. H19 Moved by Mrs L. Hancey Seconded by H.C Lawrie THAT the staff be authorized to retain the services of Cumming-Cockburn & Associates Limited, at an estimated cost of $4,400 00, for the detailed engineering in connection with repairs to the Palgrave Dam CARRIED 7 DELLCREST CHILDREN'S CENTRE -Occupancy of Authority-owned land #1651 Sheppard Avenue West, Downsview Dells Park (Black Creek) Res. H2O Moved by Mrs L. Hancey Seconded by H C. Lawrie THAT the communication received from the Metropolitan Toronto Clerk and dated April 27, 1983, concerning the occupancy of Authority-owned lands in the Black Creek valley south of Sheppard Avenue, be received; AND FURTHER THAT the Metropolitan Toronto Clerk be advised that the Authority concurs with the recommendation adopted by the Council of The Municipality of Metropolitan Toronto at its meeting held April 26, 1983 . CARRIED 8 TOWN OF MARKHAM -Request for Authority-owned land former Unionville Planing Mill, Town of Markham (Rouge River) Res #121 Moved by Mrs L Hancey Seconded by H.C. Lawrie WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Town of Markham to convey a small parcel of Authority-owned land; AND WHEREAS it is the opinion of the Authori ty that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Town of Markham in this instance; THAT a small parcel of Authority-owned land, containing 0.950 acres, more or less, be conveyed to the Town of Markham; said land being Lot 1, Part of Lot 2, Registered Plan 348, Town of Markham (The Regional Municipality of York) Consideration to be the nominal sum of $2 00, and any other costs involved in completing this transaction; -5- B-l77 THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 21 (c) of The Conservation Authorities Act, R S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and execution of any documents CARRIED 9 BOROUGH OF SCARBOROUGH -property south of Lawrence Avenue East, Chesterton Shores Area (Waterfront) Res. U22 Moved by M.W H Biggar Seconded by E V Kolb WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Borough of Scarborough to grant a permanent easement across Authority-owned land required to faci li ta te storm drainge in the Chesterton Shores Area; AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authori ty, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Borough of Scarborough in this instance; THAT a permanent easement, containing o 245 acres, more or less, be granted to the Borough of Scarborough for storm drainage in the Chesterton Shores area; said land being Part of Block 'G' , Registered Plan 275, Borough of Scarborough (The Municipality of Metropolitan Toronto) , desigated as Part 3 on Plan 64R-9241 Consideration to be the nominal sum of $2 00, plus all legal, survey and other costs; THAT said grant of easement be subject to an Order-in-Council being issued in accordance with Section 21(c) of the Conservation Authorities Act, R S 0 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED 10 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT -Property (a) Melvin & Mireille Freedman (b) Joseph L & Violet C Womersley (c) Albert 0 L & Bertha M Burnese Res 1H23 Moved by M W H Biggar Seconded by Mrs L Hancey THAT the report (May 10, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchases CARRIED "Re Project Land Acquisition Project 1982-1984 Lake Ontario Waterfront Authority Executive Resolution #88, Meeting #4 - April 8 , 1981, and Authori ty Resolution B8, Meeting #3 - May IS, 1981 Subject property South side of Crescentwood Road Owners (a) Melvin & Mireil1e Freedman (b) Joseph L & Violet C Womersley (c) Albert 0 L & Bertha M Burnese Area to be acquired (a) 0 086 acres, more or less (b) 0 116 acres, more or less (c) 0 104 acres, more or less Recommended purchase price Nominal consideration of $2 00 in each instance, plus vendor's legal costs B-178 -6- "Included in the requirements for the above-noted project are 3 irregularly- shaped parcels of land, being Part of Lots 1, 2, and 3, Plan M-5sl, Borough of Scarborough (The Municipality of Metropolitan Toronto), located south of Crescentwood Road, east of Warden Avenue. "Negotiations have been conducted with the owners, and, subject to the approval of your Committee, agreement has been reached with respect to purchases as follows The purchase price is to be the nominal consideration of $2 00, with date of completing the transactions to be as soon as possible. "I recommend approval of these purchases, and that the legal firm of Gardiner, Roberts be instructed to complete the purchases. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "This property is being conveyed to the Authority in connection with certain erosion control works being carried out along the Scarborough Bluffs. "Funds are available for this acquisition - Account 0-04-13-401 - Hazard Land Acquisition " 11. REPORT H/83 - INFORMATION & EDUCATION ADVISORY BOARD Res H24 Moved by Ms. S. Nimmo Seconded by Mrs. N. Stoner THAT Report il/83 of the Information and Education Advisory Board, as appended as Schedule nAil of these Minutes, be received; AND FURTHER THAT the recommendations contained therein be approved. CARRIED 12 KORTRIGHT CENTRE FOR CONSERVATION -Sheltered Patio Eating Area Proposal Res U2s Moved by Mrs. L Hancey Seconded by Mrs N. Stoner THAT the firm of Shore Tilbe Henschel Irwin Peters, Architects & Engineers, be awarded the contract for preliminary design sketches, Code and Engineering Review, for the sheltered patio eating area at the Kortright Centre for Conservation, at a maximum fee of $1,000 00. CARRIED 13 FINANCIAL REPORT AND ACCOUNTS -Month End i ng Apr il 30, 1983 Res. 1126 Moved by E.V Kolb Seconded by J S. Scott THAT the Divisional Expenditure Summary for the period April l-Apr il 30, 1983, as appended as Schedule "B" of these Minutes, be received; AND FURTHER THAT payment of the Authority accounts, in the amount of $1,254,446 00, be approved CARRIED 14. ADMINISTRATION HEADQUARTERS -Flooring Of five quotations requested, the following were received York Tile $14,850 00 Delta Tile $l5,360 00 Richmond Tile $15,700 00 Leader Tile $17,275 00 -7- B-179 Res #127 Moved by M W H. Biggar Seconded by E. Fulton THAT the quotation of York Tile, in the amount of $14,850 00, for the supply and installation of 8" x 8" Monoceram glazed tile at the Authority Administration Headquarters, be accepted; THAT Fairwin Construction Company Limited be retained, at a cost not to exceed $4,510 00, to carry out the carpentry and labour required for under- cutting doors, lifting and replacing counters, etc , and to provide general supervision of the work; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of approval of the Regional Director of the Ministry of Natural Resources, and the execution of any documents CARRIED. 15 "A REVISED CONSERVATION AUTHORITIES APPROVAL SYSTEM -Optional Level of Delegated Authority" Res #128 Moved by H.C Lawrie Seconded by W G Barber THAT the Reg ional Director, Central Region, Ministry of Natural Resources, be advised that The Metropolitan Toronto and Region Conservation Authority accepts the Optional Level of Delegated Authority on the understandings as set out in the Acting Regional Director's letter of April 28, 1983; AND FURTHER THAT the Authority has assigned its General Manager the responsibility of giving the approval formerly given by the Regional Director CARRIED 16 BY-LAW 154-80 THE MUNICIPALITY OF METROPOLITAN TORONTO -By-Law to Provide for the Coordination of Response in the Event of a Disaster Affecting the Metropolitan Area Res #129 Moved by Mrs N Stoner Seconded by M W H Biggar THAT the representative of The Metropolitan Toronto and Region Conservation Authority on the Emergency Planning Advisory Committee be the Authority's General Manager, and that the Emergency Planning Advisory Comm it tee be so advised CARRIED 17 MINISTRY OF NATURAL RESOURCES' PRIORITY SYSTEM FOR CONSERVATION AUTHORITY FUNDING Res #130 Moved by H C Lawrie Seconded by M W H Biggar THAT the staff report on the "Ministry of Natural Resources priority System for Conservation Authority Funding" be received; THAT it be forwarded to the Minister of Natural Resources as the Authority's comment with respect to the current system of allocating provincial funding; AND FURTHER THAT copies of the report be provided to the Authority's member municipalities for information CARRIED 18 TERMINATION On motion, the meeting terminated at 12 OS P m , May 18 Florence Gell W E J.ones Chairman Secretary-Treasurer KC B-180 SCHEDULE "A" TO The Cha~~~~n anq ~embers of the Executive Committee, M T R C A , Meeting #7/83 - Wednesday, May 18, 1983 FROM Ms S Nimmo, Chairman of the Information & Education Advisory Board RE REPORT #1/83 - INFORMATION AND EDUCATION ADVISORY BOARD THE BOARD RECOMMENDS THAT 1 The Kortright Centre for Conservation Central Core Area Plan, as prepared by the Landplan Collaborative Ltd , dated April 28, 1983, be received; 2 The staff be directed to obtain proposals from architects for the design of the sheltered patio eating area; 3 The staff be asked to reconsider the plan for the parking lot, without removing the existing berms and incorporating Phase II of the plan, to obtain the necessary parking spaces; 4 Consideration be given to the location of the "stopping area" for service vehicles; 5 The Preliminary Plans for the Albion Hills Conservation Field Centre's kitchen, dining room and mudroom, as prepared by D Ross King, Architect, dated February 10, 1983 and April 22, 1983 (Appendices 1 and 2 hereto) be approved, . 6 Humber Bay West, Phase II, be officially opened in late August or early September (during the Canadian National Exhibition) ; 7 The Chairmen of the Waterfront, Information and Education, Etobicoke- Mimico and Humber Valley Advisory Boards, along with a representative from the Mimico Cruising Club, the Etobicoke Yatch Club and the Humber College Sailing School, be appointed a committee to make the necessary arrangements; 8 The Sawyer's House or Taylor Cooperage be officially opened in 1983; 9 The Chairmen of the Humber Valley, Information and Education and Historical Sites Advisory Boards be appointed a committee to~make the necessary arrangements SN/TEB/mrp 1983 OS 11 8-181 - I: ~-... ~::~:.. ~t~k,:"~):"':~ Y:i~:' ..;, ~Jf-~.::' .~'. ";:..:~.~.:~.. ::.. ~ _. ~'" 0 - ~ .-. d --. po -- - - -. ., - ~p, a (5:)p c:i @j ~-l ~ ~ c:::5.. i: a ~o '-- -- 6> - 0 17 ~ V ~ - --. ... . ~ -.~ . m .. .... . . e30 c.o <t ~CJ a - 80 -- 0 CI "\ if} lu APPENDIX 2 -- B-182 " ""' ....~ ': J..... _ -_. ,-,,,.~:,,! [jJ ., ,-. ..., "% t~ '-' ] ,. Co (,\ .:1 { ~.iJ ~ (NJ ~~ ~ -! t: Q \ I-~ . . . . m;5f) ~(...) ! -[l~ (N)_ - - t:_ _~=_ - - - --.--- -- -. ~ ~.., -- - .____0_- ._.________...:..-_. --- - -- '.. " > '. - .--.-----------..----.-------.. ---~._- - -.-- - ~ -- . . lf~ ~ ____ ~(M) '.~ . !I;. t ~. --.- - , w - ---.- -- --- - -- _.-- - ---- . ~~~~;i . ~-::~~ ~.~ ~ ~ ....-.;, -- - - ..... --- ." ~ G'i?.Ai!b~("i:===- .:.=1 -;;' ',' ~ , ----- -- i -- ---j .,:, . ----- !!l , .. ._- - - _ os __ ______ __ . ~~(~) . ---- -- --. ~(N)-~: .. . ~(M~ _WZ5 ~(N)_ ~_(tO______~ ~ - --- - _ __. __ '___' 0 - tJ" -.- -- - -. ------- --~ ~ - -- --- - . -- 0 0 0 0 ill.!:DJ:w ~ ~ ~-~-~ ~ --- - - - - --.--- 0s,u~ '11f~U ~- 'lJOo 8Q -- ---- -- ~I'R\L '2'2/53 _ M = lD 0:1 rl = I 0:1 u:J ..J ::J Cl THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY u:J :r: u DIVISIONAL EXPENDITURE SUMMARY U) FOR THE PERIOD APRIL 1, 1983 TO APRIL 30, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ $ Finance & Admin.(inc1 Land Acq ) 3,186,465 198,603 888,246 2,298,219 27 9 Water Resource - Flood Control 2,911,389 185,083 652,437 2,258,952 22 4 Water Resource - waterfront 2,325,000 59,877 191,314 2,133,686 8 2 Conservation Land Management 3,548,345 293,036 986,423 2,561,922 27 8 Information & Education 2,426,623 153,421 635,853 1,790,770 26 2 Historical Sites 3,912,822 167,242 555,328 3,357,494 14 2 Vehicle & Equipment - Capital Acq 280,730 39,734 65,253 215,477 23 2 SUB-TOTAL 18,591,374 1,096,996 3,974,854 14,616,520 21 4 Vehicle & Equipment - Operations -- 13,152 79,542 -- -- Special projects -- 53,840 192,031 -- -- C 0 E D 1983/84 2,123,808 28,782 28,782 2,095,026 1 4 Food Services 833,317 61,676 111,943 721,374 13 4 TOTAL 21,548,499 1,254,446 4,387,152 -- -- --------------------------------------------------------------------- --------------------------------------------------------------------- ~ , B-184 the metropolitan toronto and region conservation authority minutes REPORT #9/83 EXECUTIVE COMMITTEE l-JUNE-1983 #9/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 1 June, 1983 PRESENT FOR THE HEARING Chairman Mrs. F.E. Gell Vice-Chairman E.V. Kolb Members M.W H. Biggar Mrs. L Hancey H.C. Lawrie S.A. Macpherson Ms. S. Nimmo J S. Scott Mrs N. Stoner Planning & Design Engineer, York Region R. Gee Asst. Roads Designer, York Region B. Boston Following the roll call, the meeting recessed to hold a hearing re The Regional Municipality of York Town of Richmond Hill Rouge River Watershed PFESENT FOR THE MEETING Chairman Mrs. F.t". Gell Vice-Chairman E. v. Kolb Members M.W.H. Biggar E. Ful ton Mrs. L. Hancey H.C Lawrie S A. Macpherson Ms. S. Nimmo J S Scott Mr S' . N Stoner Authority Members R.J Crowe- Dr. W.M. Tovell ABSENT Member if .G~ Barber MINUTES Res. #:131 Moved by: Mrs._ N.. Stoner' Sec-onded by: S'.A ~ Macpherson THAT the Minutes', of Meeting #8/83 be approved. CARRIED. SECTION I ITEM FOR CONSIDERATION l. APPOINTMENT OF GENERAL MANAGER Res. #132 Moved by Mrs.. L. Hancey Seconded by: M-.W H. Bigqar THE EXECUTIVE COMMITTEE" RECOMMENDS. tha-t the matter of' advertising the position of. General Manager and the appointment. of a General Man-aqer be left'. in abeyance until completion' of the Review of- the- Authori ty' s Organization and Mandate. CARRIED. B-185 -2- SECTION II ITEMS FOR INFORMATION 2 CORRESPONDENCE '.lr ~~ t\ ~lcLean , Acting General Manager, reported receipt of the following correspondence (a) Letter dated May 17th, 1983, addressed to the Chairman and Members of the Executive Committee by W R Herrid;je Q C . making suggestions concerning the membership of the proposed Steering Committee for the Review of the Authority's Organization and Mandate, and expressing the view that it would be unfortunate if the work done last year by the Reorganization Committee were to be lost Res #133 Moved by E Fulton Seconded by H C Lawrie THAT the letter dated May 17th, 1983, addressed to the Chairman and Members of the Executive Committee by W R Herridge, Q C , be referred to the Chairman and the Vice-Chairman of the Authority for consideration in their consultations concerning the establishment of a Steering Committee for the Review of the Authority's Mandate and Organisation CARRIED (b) Three letters dated 19th May, 1983 (2 ) and 27th May, 1983 from R J Crowe to W A McLean (il Policy of the Authority regarding 'in camera' meetings of the Executive Committee, ( iil Attendance at the Special Meeting that the Executive Committee held with the Chairmen of Metropolitan Toronto and the Regions (iii) Reply by Mr Crowe to Mr McLean's response to (il and (ii) , which Mr Crowe did not consider adequate Res #134 Moved by Mrs N Stoner Seconded by M W H Biggar THAT the correspondence noted in (b) (il , (iil and (iii ) be circulated for consideration at the next regular meeting of the Executive Committee CARRIED (c) Registration material for the following The 1983 Conservation Authorities Tour - September 18-21, 1983 Thunder Bay, Ontario 38th Annual Meeting of the Soil Conservation Society of America, July 31-August 3, Hartford, Connecticut This Authority has been allocated 9 reservations for the 1983 Conservation Authorities Tour, and the following members and staff would like to attend Mrs F E Gell E V Kolb E Fulton H C Lawrie S A Macpherson J S Scott M M Smith, Q C W A McLean W E Jones (d) Request from The Association of Conservation Authorities of Ontario that a staff member from this Authority be made available to serve on a sub-committee to be established on the Standardisation of Water Management -3- B-186 Res #135 Moved by Mrs N Stoner Seconded by S A Macpherson THAT Mr T E Farrell be appointed to serve on a sub-committee on the Standardisation of Water Management, to be established by The Association of Conservation Authorities of Ontario CARRIED 3 APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 170 Res #136 Moved by Mrs L Hancey Seconded by Mrs N Stoner THAT the applications listed herein as A(l) to A(8) inclusive, be approved, subject to the conditions contained in the reports CARRIED A(l) Borough of Etobicoke To construct sanitary sewer crossing of the Berry Creek, west side Kipling Avenue, north of Rexdale Boulevard (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #PSB-3432, Sheet #3, prepared by the Borough of Etobicoke Engineering Department, and dated March 9, 1981 A(2) Monarch Construction Ltd To remove existing dam and re-grade area to conform to channel configuration upstream and downstrea, Burndennett Creek, Town of Markham (Rouge Rive Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) A drawing of the proposed work prepared by Andrew F Brodie, dated April 11, 1983 (b) Correspondence describing details of the work dated April IS, 1983, from Andrew Brodie Associates A(3) Mr Syd Hopkinson To place fill at rear of #8041 Kennedy Road, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit A photo-copy of part of a plot plan prepared by Peter Dehaan, dated January, 1983 A (4) Mr Antonio DaCosta To construct residence in Regional Storm flood plain of the Humber River, south of King Street, east of John Street, Village of Bolton In accordance with the following documents and plans, which shall form part of the permit Site Plan prepared by Aaron Designs B-187 -4- A(5) Emilio Vagni Investments Ltd To repair concrete seawall at rear of #2 Lakeshore Drive, directly west of southerly extent of Sand Beach Road (Waterfront) In accordance with the following documents and plans, which shall form part of the permit Site Plan and Section as prepared for Mr W Williams, and dated March 26, 1983 A(6) Old Mill Investments Ltd To construct retaining wall and to re-construct parking lot adjacent to the Humber River, Part Lot 1, R P R-1662, Borough of Etobicoke In accordance with the following documents and plans, which shall form part of the permit (a) Plan of Survey, Project #69-73, as prepared by B J Haynes, Ontario Land Surveyor (b) Gabion basket wall being constructed as per cross section plan as submitted by Old Mill Investments Ltd A (7) The Municipality of Metropolitan Toronto Parks & Property Department To construct parking lot on flood plain of the Humber River, James Gardens, Borough of Etobicoke In accordance with the following documents and plans, which shall form part of the permit (a) The site plan as prepared by the Metropolitan Toronto Parks Department, which has been designated as "Silver Creek Parking Lot" (b) The landscaping earth berm along and adjacent to the westerly limit of the proposed lot being deleted from the site plan A(8) The Jewish Community Centre of Toronto To construct pedestrian bridge across the Don River opposite Y M H A Recreation Centre, #4588 Bathurst Street, City of North York In accordance with the following documents and plans whiCh shall form part of the permit Proposed plan as prepared by Alex Tobias Associates Ltd , drawing #Sl, Contract #8223, dated December 21, 1982 and revised March 15, 1983 (as indicated) 4 REPORT #2/83 - BUDGET & fINANCE SUB-COMMITTEE Res #137 Moved by E V Kolb Seconded by J S Scott THAT subject to the approval of the Regional Director of the Ministry of Natural Resources, the firm of Woods Gordon, Management Consultants, be retained to make a comprehensive study of the procedures and organization of the purchasing function of the Authority, and provide a report for both short-term and long-term opportunities for improvement in accordance with their letter of April 21, 1983 at a cost not to exceed $6,500 00, subject to these funds being available from the Ccmmunications budget of the finance & Administration Division CARRIED -5- B-188 5 DECISION OF HEARING -The Regional Municipality of York Town of Richmond Hill Rouge River Watershed Res #138 Moved by J S Scott Seconded by M W H Biggar THAT the application of The Regional Municipality of York, in accordance with Ontario Regulation 170, for permission to alter a watercourse in the vicinity of 16th Avenue and Leslie Street in the Town of Richmond Hill (Rouge River watershed), be refused for the following reason That the application, as submitted, will affect the control of flooding wherein upstream flood elevations will be increased CARRIED 6 TERMINATIOt\ On motion, the meeting terminated at 11 20 a m , June 1st Florence Gell W E Jones Chairman Secretary-Treasurer KC c... B-189 , the metropolitan toronto and region conservation authority minutes REPORT #10/83 EXECUTIVE COMMITTEE ls-JUNE-1983 #lO/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, IS June, 1983 PRESENT Chairman Mrs F.E. Gell Vice-Chairman E.V Kolb Members W.G. Barber M.W.H. Biggar E. Fulton Mrs L. Hancey H.C. Lawrie S.A. Macpherson Ms. S. Nimmo J S. Scott Mrs. N. Stoner Authority Member R.J. Crowe MINUTES Res #139 Moved by W.G. Barber Seconded by M.W.H. Biggar THAT the Minutes of Meeting #9/83 be approved. CARRIED SECTION I FOR CONSIDERATION 1 PROJECT FOR THE ACQUISITION OF THE TORONTO BRICK COMPANY LIMITED Res #140 Moved by M W H. Biggar Seconded by Mrs L. Hancey THE EXECUTIVE COMMITTEE RECOMMENDS THAT a "Project for the Acquisition of the Toronto Brick Company Limited - 1983". as amended. and appended as Schedule "A" of these Minutes, be approved, AND FURTHER THAT the following action be taken (a) The Municipality of Metropolitan Toronto be designated as the benefiting municipality on the basis set forth in the project. (b) The Government of Ontario be requested to approve the project and a grant of 55% of the cost thereof, (c) Pursuant to Section 24 of the Conservation Authorities Act, approval of the Ontario Municipal Board be requested, (d) When approved, the appropriate Authority officials be authorised to take whatever action is required in connection with the project, including the execution of any documents. (e) The project be approved provided that the Province of Ontario, in considering its approval of the item, agrees that the work shall be undertaken without prejudice to existing programs of the Authority and the funding previously approved and existing within the Metropolitan Toronto Capital Works Program for The Metropolitan Toronto and Region Conservation Authority purposes. CARRIED B-190 -2- 2. POWERS OF THE AUTHORITY Res #141 Moved by Mrs L. Hancey Seconded by J.S Scott THAT a copy of a letter, dated May 26, 1983, from Mr John B Conlin, Q C , of the legal firm Gardiner, Roberts, together with a copy of the Authority's Regulations, be forwarded for information to each member of the Authority CARRIED. 3. COUNSEL REPRESENTATION AT ALL AUTHORITY MEETINGS At Meeting #3/83 of the Authority, the following resolution was adopted 'Res. #56 THAT the Executive Committee investigate the cost factor and other data on having a representative of Gardiner Roberts in attendance at every Authority meeting CARRIED , Res #142 Moved by J.S Scott Seconded by E Fulton THAT in accordance with direction of Authority Meeting #3/83, the information received from Mr John B Conlin, Q C , of the legal firm Gardiner, Roberts concerning fee for attendance at Authority meetings, be referred to the full Authority CARRIED SECTION II FOR INFORMATION 4 CORRESPONDENCE Mr W A McLean, Acting General Manager, reported receipt of the following correspondence Letter received June 3 from Mr W.G Barber, member of the Executive Committee requesting that the Committee authorise him to attend the American Public Workl Association Annual Congress, to be held in Detroit - September 10-15, 1983 On this occasion, Mr Barber is to be the recipient of the first Honorary Membership Award of the Utility Location and Coordination Council. Res #143 Moved by E. V . Kolb Seconded by Mrs L Hancey THAT Mr W G Barber be authorised to attend the Annual Congress of the American Public Works Association, to be held in Detroit - September 10-15, 1983, and that his expenses in this connection, in the estimated amount of $632 00, be paid, AND FURTHER THAT Mr Barber be congratulated upon the recognition of the Utility Location and Coordination Council for his many contributions to the ULCC concept and outstanding success in the Metro Toronto area CARRIED 5 APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 170 Res #144 Moved by Mrs. L Hancey Seconded by M W.H Biggar THAT the applications listed herein as A(l) to A ( 11 ) inclusive, be approved, subject to the conditions contained in the reports CARRIED -3- B-19l -- A(l) The Regional Municipality of York To re-construct 16th Avenue over the Beaver Creek, including roadway widening and replacement of culvert, Town of Richmond Hill (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit All work being carried out in accordance with Drawings submitted - P-l08s-2, 5-277 , Sheet No. 16, as prepared by The Regional Municipality of York Engineering Department, and dated April 25, 1983. A(2) The Regional Municipality of York To widen Leslie Street and replace culvert on the Beaver Creek, Town of Richmond Hill (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit All work being carried out in accordance with drawings submitted (P-l08l-6, 5-273-1), as prepared by The Regional Municipality of York Engineering Department, and dated April 25, 1983 A(3) toIargaret E. Tamblyn To erect chain link fence around existing swimming pool within Regional flood plain, #12 Littlebrook Court, Town of Markham (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan of the subject lands on which the applicant has marked the location of the proposed fence in red. A(4 ) Borough of York To demolish existing Scarlett Road bridge over the Black Creek and replace it with four-lane structure, Lot 8, Concession HR, and Block I AI, Plan 5052, Borough of York (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing Nos. 34l88-l3K 1 and 2, 34l88-2H-7, 8, 10, and 11, prepared by Fenco Engineers Inc. A(s) Borough of York To widen and renovate Scarlett Road bridge over the Humber River, Part Lot 9, Concession HR, Borough of York In accordance with the following documents and plans, which shall form part of the permit Drawing Nos 34l88-2H-9, 8s74-2H-3, 8s74-7T-l, prepared by Fenco Engineers Inc B-192 -4- A(6) York Excavating & Paving Co Ltd To grade and stabilize section of valley slope and con~truct storm sewer outfall, north of Langstaff Road, east of Keele Street, Town of Vaughan (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan prepared by Mastrodicasa Engineering Ltd , Project #8226, and dated April 18, 1983 A(7) Muriel & Henry Brown To build two small retaining walls on the side slope of the Highland Creek valley, rear of #311 Beechgrove Drive, Borough of Scarborough In accordance with the following documents and plans, which shall form part of the permit A cross-section prepared by S.A Szenasi Contracting, received in this office May 10, 1983 A(8) Mr P Douglas Sheen To grade area of #1467 Rougemount Drive, Town of Pickering, for erection of single-family dwelling (Petticoat Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Project #SP-ls34, Sheets 1, 2, and 3, prepared by the applicant. A(9) Red Cedar Investments Ltd To construct subdivision north of Woodbridge Avenue, west of Clarence Street, Village of Woodbridge (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing Nos A-A-l and A-A-2, Project #898, as prepared by Young & Wright Architects and dated April 11, 1983, and stamped by M.C Kazdan, P Eng A(lO) Mr & Mrs Joseph Kreiner To replace culverts at #981 Teston Road, Town of Vaughan (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit A sketch prepared by Joseph Kreiner, showing the proposed location of the culverts A(ll) Gulf Canada To grade north-west corner Bayly StreetjWestney Road South, and construct gas bar and car wash (development to include concrete retaining wall) , Town of Ajax (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawings #82-3136 and 82-3156, prepared by Gulf Canada Limited and dated March and April, 1983, respectively -5- B-193 A(l2 ) Eileen & Michael Connor To place fill at rear of #1 Lakehurst Crescent, Borough of Scarborough (Waterfront) Application withdrawn 6. BOROUGH OF YORK -Request for Authority-owned land for widening of Scarlett Road, vicinity of Cynthia Road (Humber River Watershed) Res #145 Moved by S A. Macpherson Seconded by: Mrs. N. Stoner WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Borough of York to grant a conveyance of Authority-owned land to facilitate the widening of Scarlett Road in the vicinity of Cynthia Road, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Borough of York in this instance, THAT a conveyance of 0 084 acres, more or less, be granted to the Borough of York for the widening of Scarlett Road in the vicinity of Cynthia Road, said land being Part of Lot 28, Registered Plan 789, Borough of York (The Municipality of Metropolitan Toronto). Consideration to be the sum of $2.00, plus ?ll legal, survey, and other costs, THAT said conveyance be subject to an Order-in-Council being issued in accorQance with Section 2l(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85, as amended, AND FURTHER THAT the appropriate Authority officials be authorised and directed to take whatever action may pe required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED. 7 REPORT #1/83 - TENDER OPENING SUB-COMMITTEE -Bolton Flood Control Project Phase II Res. #146 Moved by Mrs. L Hancey Seconded by M W.H. Biggar THAT Report #1/83 of the Tender Opening Sub-Committee, as appended as Schedule "B" of these Minutes, be rec;:eived, AND FURTHER THAT the contract for the Bolton Flood Control Works Phase II be awarded to Sonterlan Construction Corporation in the amount of $859,099 41, it being the lowest proper tender CARRIED 8 HUMBER RIVER CHANNEL IMPROVEMENTS FORMER VILLAGE OF BOLTON -Extra Work Orders Nos 6 and 7 Res. #147 Moved by Mrs L. Hancey Seconded by M W H. Biggar THAT Extra Work Orders Nos 6 and 7 to the contract for Humber River Channel Improvements in the former Village of Bolton, in the amounts of $50,270 00 (deletion) and $50,260 00 (addition) respectively, be approved, AND FURTHER THAT the approval of the Ministry of Natural Resources be requested CARRIED B-194 -6- 9 M.T R.C.A -&- THE REGIONAL MUNICIPALITY OF DURHAM -Extension of Rental Agreement #527 & #531 Rodd Avenue, Town of Pickering (Waterfront) Res #148 Moved by J S Scott Seconded by H.C Lawrie THAT the existing rental arrangement between the Authority and The Regional Municipality of Durham concerning the properties municipally known as #527 and #531 Rodd Avenue, Town of Pickering, be extended for an additional one- year term, terminating June 30, 1984, THAT the appropriate Authority officials be authorised and directed to take whatever action may be required to give effect thereto, including the execution of any documents, AND FURTHER THAT no further extension of said rental arrangement be granted beyond June 30, 1984 CARRIED. 10 AQUATIC PARK -Canada Goose/Gull Management Plan Terms of Reference Res #149 Moved by Mrs L. Hancey Seconded by H C. Lawrie THAT the Terms of Reference entitled "Canada Goose/Gull Managemen t Plan", as appended as Schedule "C" of these Minutes, be approved, THAT the Terms of Reference be forwarded to the Ministry of Natural Resources for consideration and approval, THAT Dr Peter Fetteroff be retained to carry out the study, at a cost not to exceed $8,100.00, AND FURTHER THAT the appropriate staff be authorised to take the necessary measures to give effect thereto CARR.IED 11 MARKETING PLAN CONSERVATION AREAS, BLACK CREEK PIONEER VILLAGE, AND THE KORTRIGHT CENTRE FOR CONSERVATION Res #150 Moved by W G Barber Seconded by H C Lawrie THAT the proposal of Woods Gordon for the provision of professional assistance in the development of questionnaires, methods of sampling, sample size, and analysis and interpretation of data required for the 1984 Marketing Plan, in the amount of $6,000 00, be accepted CARRIED. 12 ALBION HILLS CONSERVATION FIELD CENTRE -Ontario Bui.lding Code Up-date & Dormitory Re-design Of three proposals invited to (a) review the Ontario Building Code and to make recommendations on fire safety up-date and handicapped provisions, (b) re-design the dormitory at the Albion Hills Conservation Field Centre, the following were received Firm Fee Quoted Stafford-Haensli Architects $4,300 00 Strong Associates, Architects $7,500 00 -7- B-19s -- . Res. #151 Moved by J.S Scott Seconded by Mrs N Stoner THAT the proposal of Stafford-Haens1i, Architects, to (a) review the Ontario Building Code and make recommendations on fire safety and handicapped provisions, and (b) to re-design the dormitory at the Albion Hills Conservation Field Centre, in the amount of $4,300 00 (including expenses), be accepted, it being the lowest quotation received CARRIED. 13 . KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme Purchase of Electric Vehicle Res. #152 Moved by Mrs N. Stoner Seconded by M.W H. Biggar THAT the purchase of a Marathon C-300 electric, four-passenger vehicle from the Electric Transportation Corporation, in the amount of $3,200.00, plus applicable taxes, be approved CARRIED. 14. REPORT #2/83 - OFFICIAL OPENING SUB-COMMITTEE Humber Bay West Waterfront Area Phase II Res. #153 Moved by E.V. Kolb Seconded by Ms S. Nimmo THAT Report #2/83 of the Official Opening Sub-Committee be received, AND FURTHER THAT the following action be taken (a) Humber Bay West Waterfront Area, Phase II, be officially opened on Friday, September 2, 1983, (b) The Honourable John B Aird, Lieutenant-Governor of Ontario, be invited to officially open the area, (c) The Executive Committee host the platform party for lunch preceding the opening CARRIED IS PLAN INPUT AND REVIEW FLOOD PLAIN MANAGEMENT -Role of Conservation Authorities in Ontario Res. #154 Moved by H.C. Lawrie Seconded by Mrs N. Stoner THAT the Minister of Natural Resources be advised that the Authority accepts the Minister's mandate with regard to authorities being the sole commenting agencies on flood plain management matters, AND FURTHER THAT it will continue to deal with flood plain matters in accordance with the policies set out in its Watershed Plan and having regard for Government policies on flood plain criteria CARRIED. . 16 CORRESPONDENCE FROM AUTHORITY MEMBER ROGER J. CROWE Res #155 Moved by Mrs L. Hancey Seconded by Ms S Nimmo THAT as a matter of policy, non-Executive Authority members be permitted to attend Special and "in camera" meetings of the Executive Committee CARRIED B-l96 -8- 17. FINANCIAL REPORT & ACCOUNTS FOR THE MONTH ENDING MAY 31, 1983 Res. #156 Moved by J.S Scott Seconded by Mrs. N Stoner THAT the Divisional Expenditure Summary for the period May 1-31, 1983, as appended as Schedule "D" of these Minutes, be received, AND FURTHER THAT payment of the Authority accounts, in the amount of $l,307,234 00, be approved. CARRIED. 18 PROJECT FOR EROSION CONTROL & SLOPE STABILIZATION IN METROPOLITAN TORONTO: 1982-1984 -Proposed Remedial Work at Rear of #12-42 Delroy Drive and #47-51 Berl Avenue, Borough of Etobicoke (Mimico Creek) Res #157 Moved by Mrs. L. Hancey Seconded by S.A. Macpherson THAT erosion control remedial work be carried out at the rear of Nos. 12-42 Delroy Drive at 47-51 Berl Avenue, Borough of Etobicoke, at an estimated cost of $143,000 00, THAT 14 (fourteen) benefiting owners contribute a total of $8,127.00, THAT 14 (fourteen) owners provide a permanent easement over the lands where work is carried out, THAT the owners of No 24 Delroy Drive and No 49 Berl Avenue give the Authority title to the lands where the work is to be carried out in lieu of a cash contribution, AND FURTHER THAT the approval of the Ministry of Natural Resources be requested CARRIED 19 FOOD SERVICES -Equipment, Furniture, Smal1wares, Mobile Catering Equipment Quotations have been received from the following companies for the supply of the above-noted items Ideal Food Services Equipment European Hotel & Restaurant Imports Ltd Russell Food Equipment Ltd Samsonite Eaton's (Warehouse Store) General Freezer The McMichael Canadian Collection Res #158 Moved by w.G. Barber Seconded by H C Lawrie THAT the staff be authorised and directed to purchase food service equipment, furniture, smallwares, mobile catering equipment, and to carry out necessary repairs and facility improvements at the food service outlets, to a maximum of $25,000 00, from the lowest individual quotations received CARRIED. 20. REPORT #1/83 - PERSONNEL-SUB-COMMITTEE Res #159 Moved by Mrs L Hancey Seconded by S A Macpherson THAT Recommendation #1 of Report #1/83 of the Personnel Sub-Committee, as follows -9- B-197 That a 1983 economic adjustment of 37~ per hour be given to staff members holding the positions of Senior Sales Clerk, Black Creek Pioneer Village Gift Shop Clerk, Black Creek Pioneer Village Admissions Clerk, Black Creek Pioneer Village Gift Shop Clerk, Kortright Centre for Conservation (except students) Supplementary field staff as designated be approved. CARRIED Res. #l60 Moved by Mrs. L. Hancey Seconded by S A. Macpherson THAT Recommendation #2 of Report #1/83 of the Personnel Sub-Committee, as follows: That two salary ranges be established for gift shop sales staff, one range for part-time and one for seasonal staff, that are in line with market rates Part-time $4.87 - $5 37 - $5 87 Seasonal $5 87 - $6 62 - $7 37 be approved CARRIED. Res #16l Moved by Mrs. L. Hancey Seconded by M W H. Biggar THAT Recommendation #3 of Report #1/83 of the Personnel Sub-Committee That the personnel policy regarding part-time or seasonal employees being sent home due to la~k of work be approved POLICY STATEMENT EMPLOYEES BEING SENT HOME DUE TO LACK OF WORK If a part-time or seasonal employee is required to report for work, and .is notified by the Supervisor that conditions exist such that work cannot commence or must be stopped, and cannot be re-assigned to other duties for that day the employee will be paid (a) For the hours worked plus two additional hours to a maximum of the number of hours the employee was scheduled to work that day if the existing conditions are beyond the control of the Authority (e g weather conditions, fire, power failure, etc.). (b) For a minimum of three hours if the employee was scheduled to work more than three hours that day to a maximum as in No 1 above if the existing conditions are within the control of the authority (e g too many employees scheduled that day, insufficient park attendance, not enough equipment available, etc. ) be approved CARRIED Res. #162 Moved by Mrs L Hancey Seconded by H C Lawrie THAT Re~ommendation #4 of Report #1/83 of the Personnel Sub-Committee, as follows B-198 -10- That effective March 1, 1983, Mr J Berry be promoted to the position of Superintendent, Works, at the classification of" SMl, level 4, That effective June 1, 1983, Mr J Berry be named Acting Superintendent of Waterfront Development until December 31, 1983, or on the return of Mr. Mulholland, whichever occurs first, at the classification of 5M2, level 2, And Further That effective February l, 1983, Mr R Marinzel be promoted to the position of Assistant Superintendent, Works, at the classification of GF3, entry level be approved CARRIED Res #163 Moved by E. Fulton Seconded by Mrs L. Hancey THAT Recommendation #5 of Report #1/83 of the Personnel Sub-Committee, as follows THAT the Deputy General Manager, in recognition of the additional responsibilities that he is carrying due to the absence of the General Manager, be temporarily re-classified at the SMsE, level 5, category, such re-classification to be effective April 1, 1983, and to continue until such time as the position of General Manager has been resolved and filled be approved CARRIED Res #164 Moved by Mrs L Hancey Seconded by M W.H. Biggar THAT Recommendation #6 of Report #1/83 of the Personnel SUb-Committee, as follows That Mrs. Eileen Wigg's retirement date be extended to the end of the first week in January, 1984 be approved CARRIED Res #165 Moved by Ms S Nimmo Seconded by Mrs N Stoner THAT Recommendation #7 of Report #1/83 of the Personnel Sub-Committee not be approved CARRIED 21 TERMINATION On motion, the meeting terminated at 11 40 a m , June IS Florence Gell W E Jones Chairman Secretary-Treasurer I, 6-199 SCHEDULE "A" u THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY "PROJECT FOR THE ACQUISITION OF THE UNITED CERAMICS LIMITED (FORMERLY TORONTO BRICK COMPANY LIMITED)" MAY, 1983 1- B.,.200 CONTENTS I PURPOSE OF PROJECT II LOCATION AND DESCRIPTION III COSTS AND FINANCING - ~ 8-201 I PURPOSE OF THE PROJECT The purpose of this project is to enable the Authority to acquire the Toronto Brick Company Limited The acquisition of this property is in accordance with the Authority's "Objects" as defined in The Conservation Authorities Act, R S 0 1980 Chapter 85 by Section 20, as stated below The objects of an authority are to establish and undertake in the area over which it has jurisdiction a program designed to further the conservation, restoration, development and management of natural resources, other than gas, oil, coal and minerals The acquisition of this property is also in accordance with the goal of the Authority's Land Acquisition Program which forms part of the Authority's Watershed Plan as adopted by the Authority in December, 1980 The goal of the Authority's Land Acquisition Program is To acquire Hazard and Conservation Land in order to protect it against unwise Land Use which would affect the ability of the land to perform its natural functions, and to conserve significant and sensitive land for the benefit of the people of the Region , To achieve this goal, the objectives of the Land Acquisition Program will be to define and delineate those lands which portray the following characteristics and to pursue their acquisition subject to availability and funding (a) those hazard lands which are defined as being flooded by the Regional Storm; (b) those lands which, due to physical hazards of slope instability and/or unstable soils, are not suitable for development; (c) those conservation lands of a significant and/ or sensitive natural character which are best managed by a public agency to retain their natural characteristics The Toronto Brick Company Limited exhibits all three of these characteristics and as such should be acquired and retained as a valuable pUblic resource ~ B-202 II LOCATION AND DESCRIPTION Since its inception in 1957, the Authority has pursued a comprehensive water and related land management program including, as one component, the acquisition of hazard and conservation lands The acquistion component has resulted in public ownership of significant stretches of valley systems and the Lake Ontario waterfront, ensuring their long term protection from unwise use An important ancillary benefit has been the creation of opportunities for public use on these lands and their function as the backbone of the regional open space system The acquisition of the Toronto Brick Company Limited, located in the Lower Don River Valley between Bloor Street and Pottery Road as shown in Figure 1, would be an important addition to the lands owned by The Metropolitan Toronto and Region Conservation Authority and would preserve this very unique site for the benefit of the public for all time The entire site is estimated to be comprised of 19 hectares with approximately one quarter of the area being occupied by a complex of industrial buildings and brick storage areas The remainder of the site is a terraced clay quarry measuring approximately 240m by 550m which has been excavated below the ravine bottom to a depth of about 60m The brick yard property is desi~nated within the Authority's Land Acquisition Program as lands which are suitable for acquisition by the Authority based on the criteria set out in the program and reiterated in the "Purpose" of this project Since the Land Acquisition Program forms part of the Authority's approved Watershed Plan, the brick yard property can be considered for acquisition by the Authority Figure 2 illustrates a portion of the Authority's master plan for acquisition in the lower Don River Valley and illustrates that the Toronto Brick Company property is included within the Authority's acquisition limits In determining as well the suitability for acquisition of these major parcels, the Authority places priority on those lands which will fill a gap in existing Authority or public holdings The Toronto Brick Company property is one of only four properties remaining in private ownership within the lower Don River Valley By bringing the Toronto Brick Company property into public ownership, a virtually -- r B-203 , ..-.. BRICK YARD ",. DON VALLEY BRICKYARD SITE LOCATION MAP ) ~...:o "" -.00 Fig. 1 (, I I \ EGLINTON AVE. E. AVE. DON VALLEY BRICKYARD ACQUISITION LIMITS HAZARD LANDS r.......t ". . . . . . . . . ~ CONSERVATION LANDS - ~ . Fig 2 Vthe metropolitan toronto and regIon conservation authority u -- 1 B-20s continuous public open space will be provided from Dundas Street to Eglinton Avenue as shown on Figure 3 The Authority has previously acquired similar industrial properties within the Don Valley and by doing so has maintained and made available a valuable natural resource to the public of Metropolitan Toronto As can be seen in Figure 4, most of the Toronto Brick Company property including all of the buildings and brick storage area is located within the Regional floodplain of the Don River It is estimated that the flood depths in this area under the Regional flood will be 5 6 metres and in excess of 1 meter for the 100 year flood. Not only is the property susceptible to the Regionai flood but the buildings are susceptible to something less than the 5 year flood. In fact the brick yard has been flooded or nearly flooded almost annually over the past 5 years On the occasions where the buildings were not flooded, however access has been restricted due to the necessity to close the Bayview Avenue Extension as a result of high water on the road Preliminary estimates of the flood damages that could be expected based on a study prepared in 1979 indicated a pre~nt value of average annual damages of $310,000 This figure represents only the identifiable damages and does not include intangibles such as loss of business, emergency response costs, lost revenues, and lost salaries and wages ~ Public ownership of this property would ensure that flood damages and losses to the existing private industry or potential future uses would not be perpetuated Not only is this property located within the Regional floo~ plain of the Don River but it has been designated by many sources as a site which demonstrates one of the most complete records of Pleisticene geology in North America if not the world The Metropolitan Toronto and Region Conservation Authority in its Environmentally Significant Areas Study has identified this property as being regionally, provincially and nationally significant Extensive study and recording of the stratigraphy if the brick yard quarry has also been done by the Ministry of Natural Resources and various universities and other earth science agencies The planning and development of the area for public uses; once acquired, will be done in conjunction with the Municipality of Metropolitan Toronto In view of the fact that most of the property has been excavated to a depth of approximately 60m some filling will be required to maximize Z. B-206 , , DON VALLEY BRICKYARD LAND OWNERSHIP MTRCA LANDS _ PUBLIC LANDS ~ PRIVATE LANDS t..... .. .j I ~ the metropolitan toronto and region Fig 3 I __~ /: V"" Conservation authonty -- - - DON VALLEY BRICKYARD FLOODPLAIN MAPPING B-20 7 REGIONAL FLOODUNE ........ 5 YEAR FLOOOUNE --'-'- ~ --==-. - ~ '0 B-208 the use of the area The extent and method of filling will form a major part of the planning process Any filling plan that is proposed will also ensure that the geologic record is maintained and developed as a feature of the area The photographs in Figure 5 better illustrates the property and show the valuable asset that will be retained for flood plain, public open space and scientific purposes : . . ,. -, .'. . < . .:".: ) , - ------ ..- ~-- '" . '" ~ '"<'! . ~"': <~ "., " .. '. . .~ ~::;;,.:~....t ,.,'~:'!;t~;~;a,...., 0S "<~f'y;1F!f?itlJ. . '.: ....:' \''. '.', "~ l' ~'i;~;5'.', ';i:,~ . " . :', ,'.: ," ; \ ".,-'~~~~ .', ".1 ., '-.:~..>..:~~-,'~~\.~~ .~,.,-\ ~,jt '.:<....r.->r._._.-::;-...:::~~iO"' '~"'---''''''''''' ~, .j!; ~""\l- ". -...~. ~,.,_ . ':; .:;-~~.~i~..-, .:- ;:: 1 l. .~..:-_.lf~:{~~;~~~~~~. .~" . . ~:~.~<::..".. ~:..~~ '-ni\"'::~,~,'.~ ~,.~-~.~ :.~ .. ',' ,:,:. i~ ~S ....'~?\ .~i.:'~'.,r ~1:- ~ ...' . . ~~"'~" .~ .-.,,-.....;;.... . 't )~,.~..~_... .... - - ...-:.~- ~~:;~~~. .... ";.. ~~ -: ....... .\ . B-2l0 III COSTS AND FINANCING The costs associated with this project include the property acquisition costs plus all legal and survey fees COSTS Property $4,000,000 Legal and Survey, etc 200,000 Total $4,200,000 FINANCING It is proposed that the funds required for this project be raised on the basis of a 55S grant from the Province of Ontario and 45S from the Municipality of Metropolitan Toronto as benefiting municipality Province of Ontario $2,310,000 Municipality of Metropolitan 1,890,000 T'oronto Total $4,200,000 B-211 SCHEDULE "B" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY - - REPORT n 1/83 OF THE TENDER OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, June 1, 1983 commencing at 9 30 a m to consider the following tender 'BOLTON FLOOD CONTROL WORKS - PHASE II' PRESENT Chairman Mrs. F. Gell Vice Chairman Mr E V Kolb Acting General Manager Mr W McLean Secretary-Treasurer Mr W E Jones Consulting Engineer Mr D Yaeger Staff Mr J C Mather Mr R W Dewell The Committee was advised that six tenders for the project were received as follows Contractor Tender Amount $ Sonterlan Construction Corp 859,099 41 Toronto Zenith Contracting Ltd 1,007,159 00 Folco Construction Equipment Ltd 1,013,280 50 Mardave Construction Ltd 1,026,510 00 Starnino Construction 1,045,080 00 Looby Builders (Dublin) Ltd 1,121,435 00 The Tender Opening Sub-committee referred the tender documents to the Consultants, Marshall Macklin Monaghan Ltd for their review and recommendation IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT All tenders received for the Bolton Flood Control Works - Phase II be submitted to the Engineering Consultants for their review and report, with recommendations to be supplied to the Executive Committee at their meeting of Wednesday, June, 15, 1983 F Gell (Mrs) W E Jones Chairman Secretary-Treasurer 1983 06 07 RWDI fs B-2l2 SCHEDULE "CD TERMS OF REFERENCE CANADA GOOSE/GULL MANAGEMENT PLAN PURPOSE To identify Canada Geese/Gull problems and problem areas along the Toronto Waterfront with emphasis on Aquatic Park, and provide management recommendations BACKGROUND In the past few years there has been an enormous increase in the number of gulls specifically Ring-billed Gulls, and Canada Geese in the Toronto Area The increase in gulls has largely been due to the nesting habitat provided by the construction of Aquatic Park. Approximately 20 pairs of Ring- billed Gulls nested at Aquatic Park in 1973 and increased to some 75,000 to 80,000 pairs in 1982 Having such a large and seemingly growing population in an urban setting, has raised a number of problems and concerns to both the public and private sector The Authority's involvement in waterfront development for recreational uses, has made this a real concern It is therefore necessary that the gull/geese problems and possible management strategies be addressed /2 -- B-213 -2- STUDY AREA The general study area for this undertaking is the Toronto Waterfront from Etobicoke to Ajax, as well as determining the extent of the problem inland This is specifically to include Marie Curtis, Humber Bay, Bluffers Park, Ashbridges Bay, Aquatic Park, Petticoat Creek Conservation Area, Ajax Waterfront, Black Creek Pioneer Village, Metropolitan Toronto Zoo~ and other sites to be mutually agreed upon BACKGROUND REPORTS As this study is of limited duration (maximum of 5 months) the consultant is expected to rely considerably on existing literature and data To help facilitate the study, there are a number of reports that the consultant should refer to Blokpoel, H 1983 Gull problems in Ontario Blokpoel, H 1982 A summary report on work by CWS at the Eastern Headland of the Toronto Outer Harbour during 1982 Blokpoel, H 1977 Gulls an4 terns nesting in northern Lake Ontario and the upper St Lawrence River C W S.-Progress Notes No 75, July, 1977 Blokpoel,H ,P M Catling, 1977 Relationship between nest sites & G T. Haymes of Common Terns and vegetation on the Eastern Headland, Toronto Outer Harbour Can J Zoology 56(9) 2057-2061, 1978 Blokpoel,H & 1977 Colonization by gulls and terns P M Fetterolf of the Eastern Headland, Toronto Outer Harbour Bird-Banding 49(1), Winter 1978 Blokpoel, H & 1978 Origins of Ring-billed Gulls at G T Haymes a new colony Bird-Banding, Summer 1979, 50(3) 210 Blokpoel, H & 1977 How the birds took over Leslie Spit G T Haymes Can Geog J 96(2) 36,Apr/May 1978 Blokpoel, H & 1982 Immigration and recruitment of Ring- P A Courtney billed Gulls and Common Terns on the lower Great Lakes Haymes,G T & H Blokpoel 1978 Food of Ring-billed Gull chicks at the Eastern Headland of the Toronto Outer Harbour in 1977 Can Field-Naturalist 92 392 Haymes,G T & H Blokpoel 1977 Reproductive success of larids nesting on the Eastern Headland of the Toronto Outer Harbour in 1977 Ont Field BioI 32(2) 78 Weseloh,D V & 1979 Ring-billed Gull H Blokpoel C W S -Hinterland Who's Who 13 . B-2l4 -3- In addition to these reports, the consultant will examine minutes of the Canada Goose and Gull Committee meetings and seek further data from such appropriate sources as the literature, university research and public agencies such as The Toronto Harbour Commissioners, The Ministry of the Environment, Ministry of Natural Resources, Ministry of Health, local municipalities, local Humane Societies, etc INVOLVEMENT OF OTHER GROUPS Although the proponent of this study is the Authority, there are other agencies which experience similar problems such as the local and regional Parks Departments, Ontario Place and Harbourfront These and other external groups which will input into the study include CWS for expertise MNR for expertise, involvement, interest and action Local Health Units for data Humane Society for expertise and data User Groups/Public/Special Interest Groups for input etc This list is not intended to be limiting and therefore additional groups will be added if deemed appropriate by the consultant in consultation with the Authority STUDY PROCESS The consultant is required to review existing information, and seek and collect data to achieve the purpose of the study The study will be undertaken using two approaches 1 contact with appropriate government agencies 2 user surveys Liason with appropriate government agencies will be under- taken in consultation with the Authority The following are the major undertakings required It must be noted that many of the steps are interrelated and each must be viewed in relation to the whole for the successful completion of the study - /4 -- B-2ls -4- Part A 1 Become familiar with the area to be inventoried 2 Prepare a detailed work schedule e g identifying when contacts are to be made, dates of site visits and locations etc 3 Prepare a sample "survey form" for Authority comment, prior to initiation of the User Survey Part B 4 Identify which areas are used for nesting/feeding/loafing by the gulls Do the same for the Canada Geese 5. Determine the types of problems created by the gulls/geese and the magnitude/seriousness of the problem e g begging, fowling, economic damage, danger to human life/health, etc 6 Identify similarities and differences between inland and waterfront sites 7 Progress meeting with consultant and the Authority 8 Describe the how, why and where of the proliferation of gull~/geese in recent years, including an explanation of differences between gull species t.e Ring-billed Gulls vs Herring Gulls Document information for the waterfront in general and Aquatic Park specifically Part C 9 Based on Part B, identify the ramifications, if any, if the gulls/geese remain unman aged over the next 5 to 10 years Document information in general and Aquatic Park specifically Also, with specific reference to Aquatic Park identify, territorially speaking, what areas of Aquatic Park, including the dredgeate endikements, would be utilized by the birds and/or abandoned in favour of more desirable sites Further, if the Ring-billed Gulls remain uncontrolled at Aquatic Park what impact would occur for other species on the site. 10 Determine the possibility, type and extent of possible human health problems from major die-offs, water quality impairment, etc Document information for the waterfront in general and Aquatic Park specifically With specific reference to Aquatic Park, examine the local Health Unit water quality data for the last 10 years for Cherry Beach and the Aquatic Park Beach /5 B-2l6 -5- 11 Describe the major methods (pros and cons) for the management of the birds With specific reference to Aquatic Park, suggest specific management practices to prevent the birds from nesting on the dredgeate endikement lands and identify the areas best suited for nesting gulls or gull sanctuary in the area north of the main spine road 12 Prepare a draft report of the study findings and submit to the Authority for comment 13 Meet with the Authority to discuss comments 14 Finalize report as required and submit 8.,..2l7 -6- TERMS OF ENGAGEMENT 1. The study is to run for a period not to extend beyond 5 months from the initiation date, which is deemed to be when all necessary approvals have been received. 2. Details of the proposed work schedule, any surveys and user survey forms will be submitted to the Authority for approval prior to initiation or implementation. 3 A progress meeting is required midway through the study (Part B, Step 7) II A draft report is to be submitted to the Authority for comment, no later than 2 weeks prior to the end of the term The draft is to be revised to the extent required ana-the report finalized 5 MTRCA requires two copies of interim documents, graphics and reports 6 At the completion of the study, the consultant will submit to the Authority one set of all original material for use by the Authority as it deems fit. The original fina~ document is to be suitable for reproduction at 8-1/2 x 11 The siz.e of graphics is negotiable with the Authority 7 The consultant will invoice the Authority on two occassions once after Part B, Step 6, and the final at completion of the study NOTE All materials and documents, as a result of this study, are the property of the Authority and sanction of its use outside the guidelines of this study, require Authority approval 1983 05.25 JD/ fs (J) tJl () I :J: N t>l ..... t:l 00 C t"' THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY t>l DIVISIONAL EXPENDITURE SUMMARY t:l FOR THE PERIOD MAY 1, 1983 TO MAY 31, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ $ Finance & Admin. (inc1 Land Acq ) 3,186,465 169,539 1,057,785 2,128,680 33.2 Water Resource - Flood Control 2,911,389 167,361 819,798 2,091,591 28.2 Water Resource - Waterfront 2,325,000 123,202 314,516 2,010,484 13.5 Conservation Land Management 3,548,345 245,156 1,231,579 2,316,766 34 7 Information & Education 2,426,623 164,322 800,175 1,626,448 33 0 Historical Sites 3,912,822 160,756 716,084 3,196,738 18 3 Vehicle & Equipment - Capital Acq. 280,730 8,441 73,694 207,036 26 2 SUB-TOTAL 18,591,374 1,038,777 5,013,631 13,577,743 27.0 Vehicle & Equipment - Operations -- 16,304 95,846 -- -- Special Projects -- 42,593 234,624 -- -- C.O.E.D. 1983/84 2,123,808 105,093 133,875 1,989,933 6.3 Food Services 833,317 104,467 216,410 616,907 26.0 TOTAL 21,548,499 1,307,234 5,694,386 -- -- ===================================================================== c... B-2l9 , the metropolitan toronto and region conservation authority minutes EXECUTIVE COMMITTEE 29-JUNE-1983 ill/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, June 29, 1983. PRESENT Chairman Mrs. F. Gell Vice Chairman E.V. Kolb Members W.G. Barber M.W.H. Biggar E. Fulton Mrs. L. Hancey H.C. Lawrie S.A. Macpherson Ms. S. Nimmo J.S. Scott Mrs. N. Stoner Authority Member J.A. Bryson MINUTES Res. U66 Moved by S.A. Macpherson ~ Seconded by: W.G. Barber THAT the Minutes of Meeting ill/83 be approved. CARRIED. DECLARATIONS W.G. Barber declared conflict of interest on item SA (8) . SECTION I NO ITEMS SECTION II FOR INFORMATION 1- CORRESPONDENCE Mr. W.A. McLean, Acting General Manager, reported receipt of the following correspondence: Letter from Karen Lynch, Celebration Committee Co-ordinator, Toronto International Festival 1984, requesting that a speaker from Toronto International Festival be granted permission to address the Authority at Meeting is on the morning of October 14, 1983, to inform the members of the many events scheduled to celebrate the city's lsOth birthday and the bicentennial of the province of Ontario. Res. U67 Moved by Mrs. N. Stoner Seconded by: H.C. Lawrie THAT a speaker from Toronto International Festival 1984 be invited to address Authority Meeting is to be held on October 14, 1983. CARRIED. - 2 - B-220 2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Application listed on the Agenda for this meeting as item A (10) was withdrawn at the request of staff prior to the meeting. Res. #168 Moved by Mrs. L. Hancey Seconded by: S.A. Macpherson THAT the applications listed herein as A(l) to A(9) inclusive and A(ll), be approved, subject to the conditions contained in the reports. CARRIED. A(l) The Town of Caledon To alter a watercourse north of Hickman Street and west of Glasgow Road in the Village of Bolton, Town of Caledon (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit: Site Plan and Cross-Section prepared by the Town of Caledon. A(2) Dustup Development Limited To alter a watercourse and place fill in a regulated area east of Bathurst Street and north of Major Mackenzie Drive in the Town of Richmond Hill (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawings 10, 16 and 30, Project No. 8l-ES-648, prepared by Fred Schaeffer and Associates Limited and dated April 1982. A(3) The Borough of Scarborough To line with concrete section of East Markham Branch of the Highland Creek, east of McCowan Road from C.P.R. crossing to Nugget Avenue and to replace culvert under the C.P.R. with one of a larger size (Highland Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit: Drawings 1 to 10 inclusive of Project 434C prepared by ChiSholm, Fleming & Associates and dated November, 1982. A(4) John & Bettyann Allison To build second storey addition to dwelling at #15 Meadowbrook Lane, Unionville, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit: A site plan and elevation plan prepared by the applicant illustrating the location and dimensions of the proposed addition. - 3 - B-22l A(s) Raylene Murphy To build addition at rear of i209 Main Street, Unionville, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan entitled "Jug and Basin Addition", drawing i3, dated May 18, 1983, and amended by the applicant on June 7, 1983, to remove the parking lot and associated fill at the rear of the subject lot. A(6) D.L. Howes To place rip rap on the outside curve of the Duffin Creek immediately north of the Eighth Concession Line to stabilize the creek bank at an existing bridge across the creek (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit A sketch of the proposed work prepared by the applicant. A(7) The Regional Municipality of Durham To reconstruct Regional Road 5 from Side Line 12 to 1500 ft. west of Balsam, on Lots 6 to 12, between Concessions 8 and 9, Town of Pickering (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit: (a) Drawings P-83-l32 to P-83-l40 inclusive, prepared by the Region of Durham and dated April, 1983. (b) Several Standard Drawings by the Ministry of Transportation and Communications which form part of the Region's application. A(8) Bell Canada To replace deteriorated telephone cable with new cable, Regional Road 5 on Part of Lot 8, between Concessions 8 and 9, Town of Pickering (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit: Plan RW iI, Order ils9678, prepared by Bell Canada and dated June 3, 1983. A(9) Donald L. Raymer To place fill at rear of #145 Chesterton Shores, Borough of Scarborough (Lake Ontario Waterfront) In accordance with the following documents and plans, which shall form part of the permit Drawings and correspondence accompanying the application. - 4 - B-222 A(ll) Town of Markham To construct two footbridges over Bruce's Creek in the Village of Unionville, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit: (a) Plan ES and B-7602s-Bl; (b) Specifications for prefab footbridge. 3. TORONTO AREA WATERSHED MANAGEMENT STRATEGY STUDY (TAWMS) Results of the 1981 Proqress Report Res. #169 Moved by: M.W.H. Biggar Seconded by: H.C. Lawrie THAT the staff report on the 1981 results of the Ministry of the Environment's "Toronto Area Watershed Management Strategy Study" be received. CARRIED. 4. MIMICO CREEK HYDROLOGY REVIEW STUDY Res. #170 Moved by M.W.H. Biggar Seconded by: S.A. Macpherson THAT the request by M.M. Dillon Limited for an additional $5,000.00 for the Mimico Creek Hydrblogy Review Study be approved; AND FURTHER THAT the approval of the Minister of Natural Resources be requested. CARRIED. - 5. POTTERY ROAD SNOW DUMP Res. un Moved by H.C. Lawrie Seconded by M.W.H. Biggar THAT approval be given to the City of Toronto for the disposal of snow at the Pottery Road site, for the 1983-84 season; THAT the approval be subject to the terms and conditions as set out by the Metropolitan Toronto Department of Parks and Property; AND FURTHER THAT staff be directed to consult with the City of Toronto and the Metropolitan Toronto Department of Parks and Property on a properly constructed snow dump. CARRIED. 6. REQUEST FROM THE CITY OF NORTH YORK FOR A SANITARY SEWER EASEMENT Res. U72 Moved by J.S. Scott Seconded by: M.W.H. Biggar WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the City of North York to grant a permanent easement across Authority-owned land required to facilitate a sanitary sewer in the Finch Avenue east of Jane Street area; - 5 - B-223 AND WHEREAS it is the opinion of the Authority that it is in the best interests of the Authority in furthering its objectives as set out in Section 20 of the Conservation Authoriti~s Act to co-operate with the City of North York in this instance; THAT a Permanent Easement containing 0.330 acres, more or less, be granted to the City of North York for a sanitary sewer located south of Finch Avenue, east of Jane Street, said land being Part of Lot 20, Concession 4, W.Y.S., City of North York, Municipality of Metropolitan Toronto, designated as Part 2 on Plan MX-105. Consideration to be the nominal sum of $2.00 plus all legal, survey and other costs; THAT said Easement be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED. 7 WATERFRONT PROJECT 1983: ETOBICOKE SECTOR COLONEL SAMUEL SMITH WATERFRONT PARK: BULLDOZER RENTAL Res. ~173 Moved by: Mrs. N. Stoner Seconded by: E. Fulton THAT the contract for the supply of a rental crawler-mounted tractor bulldozer with operator be awarded to R.C. Contracting Limited for the tendered rate of $25.00 per hour for the period July 11, 1983 to December 31, 1983, it being the lowest proper tender. CARRIED. 8. SHORELINE MANAGEMENT PROGRAM: SCARBOROUGH SECTOR SOUTH MARINE DRIVE: GEOTECHNICAL INVESTIGATION Res. #174 Moved by: E. Fulton Seconded by: M.W.H. Biggar THAT the firm of Geocon Inc. be retained to complete the detailed geotechnical design of the proposed shoreline protection measures at South Marine Drive on a per diem basis for a fee not to exceed $30,000.00. CARRIED. 9. 1983 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM TERMS OF REFERENCE AND CONSULTANTS' TENDERS Res. 1175 Moved by: M.W.H. Biggar Seconded by: J.S. Scott THAT Proctor and Redfern Limited be retained at an upset cost of $33,854.00 to undertake the waterfront environmental monitoring analyses as described in the Terms of Reference entitled "Terms of Reference for the Waterfront Monitoring Program 1983", it being the lowest proper tender; AND FURTHER THAT approval for the Terms of Reference be requested from the Ministry of Natural Resources. CARRIED. - 6 - B-224 10. INDIAN LINE CAMPGROUND: TURNING CIRCLE AND PARKING LOT Res. U76 Moved by: Mrs. L. Hancey Seconded by: W.G. Barber THAT the quotation received from King City Paving for approximately 1500 square yards of asphalt paving, in the sum of $10,800.00 be accepted, it being the lowest quotation received. CARRIED. ll. INDIAN LINE RESIDENCE/CONTROL BUILDING: LABOUR AND MATERIALS Res. U77 Moved by: E. Fulton Seconded by: Ms. S. Nimmo THAT the quotations for the supply of the major construction components and labour/supervision for the construction of the Indian Line Campground residence, be accepted as follows, they being the lowest acceptable quotations received: C.T.M. for supply of labour/supervision $11,480.00 Card Lumber for supply of 2"x4", 2"x6", 2"x8" and drywall 1 , 77 5 . 0 0 + PS T Custom for supply of insulation 849.00 + PST Thornlea for supply of plywood and shingles 1,825.00 + PST Argo for supply of concrete blocks 2,458.00 + PST C.B.M. for supply of concrete 1,147.14 + PST CARRIED. 12. .ALBION HILLS WASHROOM/SHELTER: LABOUR AND MATERIALS Res. U78 Moved by: Mrs. L. Hancey Seconded by: M.W.H. Biggar THAT the quotations for the supply of the major construction components and labour/supervision for the construction of the Albion Hills Conservation Area washroom/shelter complex, be accepted as follows, they being the lowest acceptable quotations received: C.T.M. for supply of labour/supervision $23,515.00 Card Lumber for supply of major lumber component 2,107.20 + PST Hanford for supply of 4"xlO" & 4"x12" D.Fir 1,964.68 + PST Thorn1ea for supply of shingles & insulation 1,637.46 + PST Argo for supply of concrete block 5,338.59 + PST C.B.M. for supply of concrete 1,147.14 + PST CARRIED. 13. REPORT il/83 - FOOD SERVICES SOS-COMMITTEE Res. #179 Moved by: E. Fulton Seconded by: E.V. Kolb THAT the staff be authorized and directed to purchase additional food service equipment, furniture, smallwares, mobile catering equipment, and to carry out necessary repairs and improvements at the food service outlets, to a maximum of $10,000.00, if required; AND FURTHER THAT the report on the management of the Food Services Equipment Fund, dated March 29, 1983 , as appended as Schedule "An of these Minutes, be adopted as policy for the operation and management OL the fund. CARRIED. - 7 - B-225 14. PAINTING: ADMINISTRATION HEADQUARTERS Res. #180 Moved by Mrs. L. Hancey Seconded by W.G. Barber THAT the quotation of Benwood Painting Contractors Co. Ltd., in the amount of $7,540.00, for the painting of the interior of the Authority Administration Headquarters, at 5 Shoreham Drive, be approved, being the lowest quotation received; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of any additional approvals that may be required. CARRIED. l5. REVIEW OF ORGANIZATION AND MANDATE Res. tl8l Moved by: J.S. Scott Seconded by: S.A. Macpherson THAT the Report on the Review of Organization and Mandate, concerning Terms of Reference and both Policy and Project Steering Committees be received; AND FURTHER THAT the Executive Committee concur in the action taken by the Chairman. CARRIED. NEW BUSINESS l6. CITY OF SCARBOROUGH The Chairman extended through Mr. Ed. Fulton congratulations to the new City of Scarborough. 17. BLACK CREEK PIONEER VILLAGE - MIRACLE MART BAGS Mr. Biggar expressed the hope that a follow-up will be done on the advertising of Black Creek Pioneer village on Miracle Mart bags as there has been an expression of interest by Miracle Mart. The Chairman advised Mr. Biggar and anyone else interested in this to get in touch with Mrs. Edna Gardner who is looking into the matter. 18. DON VALLEY WATERSHED TOUR Mrs Hancey expressed her appreciation for the excellent work done by the staff on the Don Valley Watershed Tour,particularly that of Mr. W.A. McLean and Mrs. Alyson Deans. Ratepayer groups were invited on this tour, and 15 groups each sent two representatives, all of whom gained a better appreciation of the work being done by The Metropolitan Toronto and Region Conservation Authority 19. SCARBOROUGH TOUR Mr. Barber expressed his thanks to Ed Fulton and Roger Brown of the City of Scarborough for the tour which took place June 23rd, and appreciation to the Chairman and members of the Authority who made it a success. - 8 - B-226 20. R.D.H.P.C. ADVISORY BOARD MEETING AND TOUR Mrs. Stoner stated that Dr. Walter Tovell had given a very interesting presentation on the Report of the Reorganization Committee at the R.D.H.P.C. Advisory Board meeting on June 9th. Mrs. Stoner also expressed appreciation to the staff for the excellent tour which followed the meeting. 2l. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE (a) Ms. Nimmo, on behalf of the Official Opening Sub-Committee for the Black Creek Pioneer Village Visitor Centre, confirmed that the ground breaking ceremony will take place on August lO, following the Executive Committee Meeting, not on July 29 as previously stated. (b) The Secretary-Treasurer informed the Committee that $140,000.00 has been received to date from the McNair Estate and that a further payment is expected around the middle of July. 22. C.O.E.D. The Secretary-Treasurer informed the Committee that the Authority has received a cheque for $431,000.00 from the Federal Government for the above project, and that staff has been assured that the Province of Ontario portion will be received in the next few weeks. 23. TERMINATION ON MOTION, the meeting terminated at 10.40 a.m. and members were invited to attend the Black Creek pioneer Village Visitor Centre Building Sub-Committee Meeting to follow. Mrs. F. Gell Warren E. Jones Chairman Secretary-Treasurer em SCHEDULE "A" FOOD SERVICES EQUIPMENT FUND 1. The Food Serviqes Equipment Fund is to apply to the refreshment facilities of all Conservation Areas, Black Creek Pioneer Village, Half Way House and the Kortright Centre for Conservation. The replacement or repair of all the food services equipment at the Albion Hills, Boyd, Lake St. George and Claremont Conservation Field Centres will not be funded from this account. 2. The account will be used for the replacement or repair of all existing food services related equipment and furnishings for the facilities included in the account. In this regard, the following guidelines will apply: (a) Routine repairs and maintenance will be funded from Operations, rather than the Food Services Equipment Account; (b) Repairs in lieu of replacement, replacement, betterment and improvements will be funded through the account; (c) Betterment/improvement is defined as an increase in capacity of the asset or an extension of the life of the asset beyond the point that could ordinarily be achieved through regular and routine maintenance and repairs. 3. All withdrawals from the account will be on the recommendation of the Food Services Steering Committee and approved by the Secretary-Treasurer or his designate and will be subject to adherence to the Authority's Purchasing Policy as it exists or as it may be amended. 4. Prior to the completion of the preliminary budget process for the 1984 Budget, the General Manager, in consultation with the Food Services Steering Committee and Secretary- Treasurer, will make a recommendation concerning the means by which the operating fund will contribute to the Food Services Equipment Fund. Such contribution will be based on a percent~ge of gross sales or equivalent criteria. 5. The replacement of consumable equipment and materials, breakages, repairs, new food service facilities and renovations will not be funded from the Food Services Equipment Fund. 1983.03.29 WAM/mm/mrp ~. B-228 , the metropolitan toronto and region conser/ation authority minutes REPORT #12/83 EXECUTIVE COMMITTEE 13-JUI.Y-l983 #12183 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 13 July, 1983 PRESENT Chairman Mrs F E Gell Members W.G. Barber M.W H Biggar (For Ms S. Nimmo) J A. Bryson E. Fulton Mrs I.. Hancey H.C. Lawrie S A Macpherson (For Mrs. N. Stoner) Mrs. M Prinsloo J S Scott ABSENT Ilice-Chairman E.V. Kolb Members Ms. S Nimmo Mrs. N. Stoner MINUTES Res #182 Moved by: W.G. Barber Seconded by M.W.H. Biggar < ' THAT the Minutes of Meeting #11/83 be approved. CARRIED. SECTION I NO ITEMS SECTION II ITEMS FOR INFORMATION l. APPI.ICATIONS FOR PERMIT UNDER ONTARIO REGUI.ATION 1 TO Res. #183 Moved by:- Mrs. I.. Hancey Seconded by M'.W..H. Biggar ,. THAT the applications listed herein as A(l) to A(4) inclusive, be. approved, subject to the conditions contained in the reports CARRIED. A(ll Town of' Pickering- To al ter a watercourse and. place fill in' the Vistula Drive. Ravine-, between Vistula Drive and Bayly Street., east of West. Shore. Blvd., (Waterfront) ~- - In accordance with the following documents and plans, which shall form part of the permit Project #82~20 I l2, Drawing #1, prepared. by Cosburn Patterson & Associates Ltd. and dated June, 1983. B-229 -2- A (2) City of Scarborough To place fill in regulated area and build storm sewer outfall in flood-vulnerable area at foot of Starspray Blvd , south of C N R , (Waterfront) In accordance with the following documents and plans, which shall form part of the permit Reference No 77-ES-4ll, Drawing #70, prepared by Fred Schaeffer & Associates Ltd and dated April, 1983 A(3) Town of Richmond Hill To alter watercourse south of Elgin Mills Road, east of Bayview Avenue, Town of Richmond Hill (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #14-04-PP l, 2, 3, and 4, da\.ed June, 1983 A(4) Town of Richmond Hill To alter watercourse east of Yonge Street, north of Sixteenth Ave , Town of Richmond Hill (Rouge River Watershed) Subject to (a) All work being done in accordance with Drawings 1 to 19, Project #82029, prepared by Cosburn Patterson & Associates Ltd , and dated April, 1983, (b) The Authority receiving a copy of the easement agreements between the Town of Richmond Hill and the affected landowners, (e) The Authority receiving from the Town of Richmond Hill written confirmation that the Town intends to ensure that individual property owners comply with the flood plain modifications required as per drawings forming part of the permit Res #l84 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the applications listed herein as A(5) to A(12) inclusive, be approved, subject to the conditions contained in the reports CARRIED . A(S) Mr Mike Giampaola To construct two clear span steel and concrete bridges across the Salt Creek, east of Airport Road, north of the 5th Line, Town of Caledon (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawings #1 to #4 inclusive, prepared by Joseph Condido and dated May, 1983 A(6) Town of Vaughan To undertake channel improvements and construct low-flow channel along the Jersey Creek from Ainsley Grova Road westerly to Aberdeen Avenue (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing Project No 83-3027 -3- B-230 A(7) Sunny Park Developments Limited To construct storm and sanitary sewer outlets, south of Green Lane and west of Don Mills Road, Town of Markham (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit: Project #M81-ES-629, Drawing Nos. 1, 2, 3, 9, 12, and 16, as prepared by Fred Schaeffer & Associates Ltd. A(8) Sausik, Reyn, Roman To place fill at Nos. 309, 313, and 317 Westpoint Avenue, City of Scarborough (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit: A site plan as prepared by the owners, dated July, 1983 and entitled "Project Re: Lots 66, 65, 64 - Plan 284." A(9) The Municipality of Metropolitan Toronto Parks & Property Department To construct parking lot in Kingsmill Park, vicinity of the Old Mill, Borough of Etobicoke (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit: A landscape sketch entitled "Kingsmill Parking Lot near Old Mill", as prepared by The Municipality of Metropolitan Parks & Property Department, and dated July, 1983. A(10) Humberview Motors Inc. , To construct addition to structure, north side Bloor Street, immediately east of the Mimico Creek, City of Etobicoke In accordance with the following documents and plans, which shall form part of the permit: Drawing # SK 1, Project 8301, as prepared by Galrich Contracting Ltd. , and dated 1983.02.07. A(11) Dr. Bernard Balshin To rehabilitate and stabilize side slopes at rear of #19 Riverside Crescent, City of Toronto, (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit: (a) Preliminary Drawing #L2-r, as prepared by Terraplan Landscape Architects, dated March, 1983; (b) Geotechnical Investigation Report prepared by L.J. Rak Engineering Ltd. , and dated March, 1983. A(12) Town of Vaughan Parks & Recreation Department To construct a timber-edge boccie court in Glen Shields Park, west of Dufferin Street, north of Clen Shields Avenue (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit: Site Plan entitled, "Glen Shields Bocci Courts", Job #PR83-16, dated June, 1983, as prepared by the Town of Vaughan Parks & Recreation Department. B-23l -4- 2 REPORT #2/83 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD Res #l85 Moved by H C Lawrie Seconded by J S Scott THAT The Metropolitan Toronto and Region Conservation Authority adopt the position that the Storm Water Management Plan for OPA 6 be implemented prior to, or concurrent with, approval of any further development in the OPA 6 area of Brampton CARRIED 3 SAVE OUR STREAMS INCORPORATED -Projects 1983 Res #l86 Moved by Mrs I. Hancey Seconded by W G Barber THAT the staff of the Authority co-operate with Save Our Streams Incorporated in the development and construction of stream improvement works on selected sites within the Authority's watershed CARRIED 4 BRUCE'S MILL CONSERVATION AREA -Grist Mill Restoration Engineering Services Res #l87 Moved by M W H Biggar Seconded by J A Bryson THAT the consulting firm of Svihra & Associates be retained, at an upset limi t of $4,000 00, to prepare a structural engineering report, detailing necessary remedial works to be undertaken on the grist mill in the Bruce's Mill Conservation Area, AND FURTHER THAT Mr William Trick, P Eng , be retained, at an upset limi t of $4,300 00, to provide technical support to Svihra & Associates to ensure that the placement of the new support footings is compatible with the operation of the drive layshafts of the building CARRIED 5 OFFICIAL OPENING BOLTON CHANNEL Res #l88 Moved by J S Scott Seconded by H C Lawrie THAT the Chairmen of the Humber Valley, Flood Control and Water Conservation, and the Information & Education Advisory Boards be appointed a committee to make the necessary arrangements for the Official Opening of the Bolton Channel CARRIED 6 EARL BALES PARK -Proposed Outdoor Theatre Res #l89 Moved by M W H Biggar Seconded by Mrs L Hancey THAT the Executive Committee advise The Municipality of Metropolitan Toronto Parks & Property Department that it has no objection to the amendment of the Earl Bales Park Master Plan to include an Outdoor Theatre, THAT the proposed site of the theatre lies outside the area subject to regulation by the Authority, AND FURTHER THAT Metropolitan Toronto be requested to make provision in their construction techniques and detailed design of the proposed structure to protect the adjacent valley wall from potential erosion during and after construction CARRIED I \ -5- B-232 7 MAPLE DISTRICT LAND USE GUIDELINES Res #l90 Moved by Mrs L Hancey Seconded by W G Barber THAT the Maple District Land Use Guidelines be received, AND FURTHER THAT the staff continue to work in co-operation with the Ministry of Natural Resources in the accomplishment of related program goals and objectives CARRIED 8 REPORT #l/83 _ BLACK CREEK PIONEER VILLAGE VISITOR CENTRE BUILDING SUB-COMMITTEE Res #l91 Moved by E Fulton Seconded by M W H Biggar THAT Report #1/83 of the Black Creek Pioneer Village Visitor Centre Building Sub-Committee be received, THAT final drawings and tender documents be available July 25, 1983, THAT advertisement of the tender be placed one week prior to receipt of final drawings and documents, THAT tenders be opened Wednesday, August 17, 1983, AND FURTHER THAT a recommendation re awarding of the tender be considered by the Executive Committee on August 31, 1983, or sooner if required CARRIED NEW BUSINESS 9 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE -Ground Breaking Ceremony Res #l92 Moved by M W H Biggar Seconded by Mrs L Hancey THAT, due to delays in the tendering process for the Black Creek Pioneer Village Visitor Centre, Item 2l(a) of the Minutes of Executive Committee Meeting #11/83 __ referring to the date of August 10, 1983, for the Ground Breaking ceremony -- be returned to the sub-committee for further consideration CARRIED lO EXECUTIVE COMMITTEE MEETING SCHEDULE 1983 -Amendments Res #l93 Moved by Mrs L Hancey Seconded by J S Scott THAT the following changes be made in scheduled Executive Committee meetings CANCEL meetings scheduled for September 7 and 2l RE-SCHEDULE meetings to August 3l and September l4 CARRIED 11 TERMINATION On motion, the meeting terminated at 11 05 a m , July 13 Florence Gell W E Jones Chairman Secretary-Treasurer KC ~ B-233 , the metropolitan toronto and region conservation authority minutes REPORT #l3/B3 EXECUTIVE COMMITTEE lO-AUGUST-l983 #13/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 10 August, 1983 PRESENT FOR THE HEARING Chairman Mrs. F E Gell Vice-Chairman E.V. Kolb Members W.G Barber Mrs. I. Hancey H C. I.awrie (For E. Fulton) W.G McLean Ms. S. Nimmo J S. Scott Mrs N. Stoner HEARING Following the roll call, the meeting recessed to hold a hearing re Mr. George Hinder City of North York Don River Watershed . PRESENT FOR THE MEETING Chairman Mrs F.E Gel! Vice-Chairman E V Kolb Members W G Barber M W H. Biggar Mrs L Hancey H.C. Lawrie (For E. Fulton) W.G. McI.ean Ms S. Nimmo J.S Scott Mrs. N Stoner ABSENT Members E. Fulton S.A. Macpherson MINUTES Res. #l94 Moved by J.S. Scott Seconded by M.W.H. Biggar THAT the Minutes of Meeting #l2/B3 be approved CARRIED. DECI.ARATIONS MR W G BARBER declared a Conflict of Interest regarding Items l-A(l2) and l-A(13) herein, and did not participate in discussion or vote on these items SECTION I NO ITEMS B-234 -2- SECTION II ITEMS FOR INFORMATION l. APPI.ICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res. #l95 Moved by Mrs. I.. Hancey Seconded by: M.W H Biggar THAT the applications listed herein as A(l) to A(l6) inclusive, be approved, subject to the conditions contained in the reports CARRIED. A(l) The Municipality of Metropolitan Toronto To construct culvert on tributary of the Humber River, north side Eglinton Avenue, west of Royal York. Road (City of Etobicoke) In accordance with the following documents, which shall form part of the permit Drawing #PDB-962, Sheet 1 of 6, as prepared by the City of Etobicoke A(2) Town of Ajax - To construct Rotherglen Road crossing of the Miller's Creek, south of Highway #2 (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Contract #A83-35, prepared by Proctor & Redfern I.td , and including the following drawings Al-82704-Gl, dated June, 1983 Al-82074-Pl, dated June, 1983 Al-82074-P2, dated June, 1983 Al-82074-Bll, dated February, 1983 Al-82074-B12, dated February, 1983 A(3) Mr Michael Kalimin To construct in-ground swimming pool at rear of #l79 Edenbridge Dri ve , City of Etobicoke (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit A plot plan and cross section, as prepared by Michael Kalimin and Mary Kalimin, and attached to the application A(4) Town of Markham To build sanitary manhole and sewer connection, end of Princess Street, west of Highway #48, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) File #549-04-Al-03093, Drawing #ll, dated June 1983, by Gore & Storrie I.td., (b) File #549-04-Al-03095, Drawing #l3, dated June 1983, by Gore & Storrie Ltd (c) Correspondence relating to the easement, in the name of Markham, over Authority lands . -3- B-235 A(5) Town of Markham To construct storm sewer outfall east of Warden Avenue, south of Highway #7 (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) Project #lO-82075, Drawing #2, issued July 1983, by Marshall Macklin Monaghan Ltd. for the Town of Markham, (b) Project #10-82075, Detail of the Concrete Headwall and Energy Dissipator I.ayout, dated July 1983, by Marshall Macklin Monaghan Ltd . (c) Project #lO-82075, Design of Energy Dissipator, dated July 1983, by Marshall Macklin Monaghan I.td. A(6) Joskamp Limited To build structure at #4600 Highway 7, Unionville, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) Topographical Plan of Survey of the subject lands, dated May 4, 1983, by R G McKibbon I.td., showing the proposed building and site development, (b) Elevations of the proposed building, dated July 8, 1983, by A B. Woodmansey, P Eng , (c) A site plan, floor plan, and elevations accompanying the application A(7) Monarch Construction I.td To construct road within Regional Flood plain of the Bruce Creek, east of Kennedy Road, north of Carlton Road, Town of Markham (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing PllA, dated April 1983, by Cole Sherman A(8) Town of Markham To construct storm water management pond just north of l6th Avenue, east of Woodbine Avenue (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit Project #lO-82075, Drawings lB and 2B, dated May 1983, by Marshall Macklin Monaghan I.imited A(9) City of Brampton To construct pedestrian bridge across the Mimico Creek, south of North Park Drive, east of Bramalea Road In accordance with the following documents and plans, which shall form part of the permit Sheets 4 & 5, Drawing #83-53, prepared by F J Reinders & Associates Limited. and dated July 1983 B-236 -4- A(lOl Mr Donald I. Raymer To place fill at #l45 Chesterton Shores, City of Scarborough (Waterfront) In accordance with the following documents and plans, which shall form part of the permit Drawings and correspondence accompanying the application. A(ll ) Mr. Ninko Novakovic, To place fill at north-west corner Highway #27 and Rutherford Road, Town of Vaughan (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan and cross section dated June 20, 1983 A(l2 ) Bell Canada To construct conduit across the Don River, south of Mill Street, west of Trench Street, Town of Richmond Hill In accordance with the following documents and plans, which shall form part of the permit (a) Standard Drawing #95l, (b) Plan #402, I.ocation Code 594209, Order #956397, dated June 24, 1983 A(13 ) Bell Canada To construct two crossings of the German Mills Creek, east of Maple Avenue, south of Duncan Road, Town of Richmond Hill (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Plan RW No l, Location Code 594255, Order #3592l2, dated July 13, 1983 A(l4 ) Glen Shields Estates To re-grade area of flood plain, west side Dufferin Street, north of Steeles Avenue, Town of Vaughan (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #8308-B-l, Grade Control Plan, as prepared by Paul Theil Associates I.td A(15) The Municipality of Metropolitan Toronto To place fill for re-location of two greens at the Humber Valley Golf Course, City of Etobicoke (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #Gl, as prepared by Thomas McBroom Associates Limited -5- B-237 A(l6) Dr Norman Kassabian To place fill at rear of #327 I.ake Promenade, City of Etobicoke (Waterfront) In accordance with the following documents and plans, which shall form part of the permit (a) All work to be carried out in accordance with the detailed construction Drawings PI, dated January 4, 1983, PIA, dated May 30, 1983, P9, dated April l8, 1983, PlO, dated July lO, 1983, PlOA, dated May 26, 1983, and Pll, dated April l8, 1983, (b) The Authority is to be notified at least 24 hours prior to commencement of back-filling behind the concrete wall 2. REHABILITATION OF THE PAI.GRAVE DAM, TOWN OF CALEDON Res. #l96 Moved by Mrs I. Hancey Seconded by Mrs. N. Stoner THAT Report #2/83 of the Tender Opening Sub-Committee, as appended as Schedule "A" of these Minutes, be received, THAT the contract for the rehabilitation of the Palgrave Dam on the Humber River, Town of Caledon, be awarded to Massi Construction Co Ltd , in the amount of $38,45l 00, AND FURTHER THAT a contingency item be included, which would increase the total amount for the project to $42,296.00 CARRIED. . 3 THE MUNICIPAI.ITY OF METROPOLITAN TORONTO -Request for permanent easement east of Islington Avenue, south of Finch Avenue, City of North York , (Humber River Watershed) Res #l97 Moved by Mrs N. Stoner Seconded by W.G. Barber WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from The Municipality of Metropolitan Toronto to grant a permanent easement across Authority-owned land required to facilitate a sanitary sewer, east of Islington Avenue, south of Finch Avenue, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with The Municipality of Metropolitan Toronto in this instance, THAT a permanent easement containing 0.228 acres, more or less, be granted to The Municipality of Metropolitan Toronto for a sanitary sewer located east of . Islington Avenue, south of Finch Avenue, said land being Part of Lot 20, Concession VI, W Y S., City of North York (The Municipality of Metropolitan Toronto), designated as Part 1 on Plan 64R-9846 Consideration to be the nominal sum of $2 00, plus all legal, survey, and other costs, THAT said easement be subject to an Order-in-Council being issued in accord- ance with Section 2l(c) of The Conservation Authorities Act, R.S.O 1980, Chapter 85 as amended, AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED B-238 -6- 4 MINISTRY OF GOVERNMENT SERVICES -Request for Authority-owned land Highway #427/Finch Avenue, City of Etobicoke (Humber River Watershed) Res. #l98 Moved by Mrs. N. Stoner Seconded by M.W.H. Biggar WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Ministry of Government Services to grant a conveyance of Authority-owned land for road purposes in the vicinity of Highway #427 and Finch Avenue, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of The Conservation Authorities Act, to co-operate with the Ministry of Government Services in this instance, THAT a conveyance of 0.04 acres, more or less, be granted to the Ministry of Government Services for road purposes in the vicinity of Highway #427 and Finch Avenue, said land being Part of I.ot 36, Concession IV, F H , and part of allowance for road adjoining the Indian I.ine, City of Etobicoke (The Municipality of Metropolitan Toronto) Consideration to be the sum of $2 00, plus all legal, survey, and other costs.. THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 21(c) of The Conservation Authorities Act, R.S.O. 1980, Chapter 85, as amended, ANB FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED. 5 I.AND ACQUISITION PROJECT 1982-1984: HIGHI.AND CREEK WATERSHED -Property 541878 Ontario Corporation Ltd. west side Cherrydale Court, vicinity Centennial/ I.awson Roads, City of Scarborough Res. #199 Moved by H.C. I.awrie Seconded by W.G. McI.ean THAT the report (July 27, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase CARRIED. Re Project I.and Acquisition Project 1982-l984 - Flood Plain & Conservation Land Component Highland Creek watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property West side Cherrydale Court, vicinity of Centennial/I.awson Roads OWner 541878 Ontario Corporation I.td. Area to be acquired 0 797 acres, more or less Recommended purchase price $l,OOO 00, plus vendor's legal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of I.ot 50, Registered Plan 2732, City of Scarborough (The Municipality of Metropolitan Toronto), located on the west side of Cherrydale Court, in the vicinity of Centennial and I.awson Roads "Negotiations have been conducted with the owner and its solicitor, Mr Vic Angelson, Messrs. Cassels, Brock, Continental Bank Building, Suite 2300, l30 Adelaide Street West, Tor<!lnto, M5H 3C2 and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows -7- B-239 The purchase price is to be the sum of $l,OOO.OO, plus vendor's legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-1l-401 - Flood I.and Acquisition " 6 I.AND ACQUISITION PROJECT 1982-l984 ROUGE RIVER WATERSHED -Property J F. Coughlan Construction Company Ltd north side Highway #2, west of Altona Road, Town of Pickering Res #200 Moved by J S. Scott Seconded by Mrs N. Stoner THAT the report (July 28, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase CARRIED. Re Project I.and Acquisition Project 1982-1984 - Flood Plain & Conservation I.and component Rouge River watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property north side Highway #2, west of Altona Road Owner J F. Coughlan Construction Company I.td Area to be acquired 4 976 acres, more or less Recommended purchase price $l2,500 00, plus payment of vendor's survey, legal, and appraisal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lot 33, Range III, Broken Front Concession, Town of Pickering (The Regional Municipality of Durham) , being a partial taking from a larger property located on the north side of Highway #2, west of Altona Road. "Negotiations have been conducted with the owner and its solicitor, Murray D. Stroud, 356 Kingston Road, Pickering, Ontario, I.lV lA2 and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $l2,500 00, plus payment of vendor's survey, legal, and appraisal costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-ll-401 - Flood Land Acquisition " B-240 -8- 7 SHOREI.INE MANAGEMENT PROGRAM SCARBOROUGH SECTOR -South Marine Drive Res. #20l Moved by W.G Barber Seconded by Mrs I.. Hancey THAT the firm F.J Reinders & Associates Ltd. be retained to prepare a detailed design of the revetment alternative for shoreline protection along South Marine Drive, Borough of Scarborough, at a fee not to exceed $12,400 00. CARRIED 8. I.AND ACQUISITION PROJECT 1982-1984 I.AKE ONTARIO WATERFRONT -Property Gerd Schwarzkopf #5 Lakehurst Crescent, City of Scarborough Res. #202 Moved by E.V. Kolb Seconded by M W.H. Biggar THAT the report (August 2, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase CARRIED. - liRe Project I.and Acquisition Project - Lake Ontario Waterfront Component Scarborough Sector Authority: Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, M~eting #3 - May l5, 1981 Subject- property #5 I.akehurst Crescent OWner Gerd Schwarzkopf Area to be acquired o 087 acres, more or less Recommended purchase price Nominal consideration of $2 00, plus vendor's legal costs "Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being Part of Lot l4, Registered Plan 4048, City of Scarborough (The Municipality of Metropolitan Toronto), and being a partial taking from a residential property fronting on the south side of I.akehurst Crescent, in the Birchmount Road area "Negotiations have been coducted with the owner and his solicitor, Mr. Steven F Troster, Suite l800, 700 Bay Street, Toronto, Ontario, M5G lZ6, and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2 00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid The Authority is to receive con- veyance of the land free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "This property is being acquired in conjunction with certain Shoreline Management Works to be carried out on this property "Funds are available for this acquisition - Account 0-04-l3-40l - Waterfront Hazard." -9- B-24l 9 QUOTATION #CI.M83-27 -.Albion Hills Conservation Area Septic System Res #203 Moved by H.C Lawrie Seconded by Mrs L Hancey THAT the quotation of J. Gilbert & Sons I.td , for the supply of equipment, labour, and material for the installation of a septic system at the Albion Hills Conservation Area, in the sum of $6,l50 00, be accepted, it being the lowest quotation received. CARRIED lO QUOTATION #CI.M83-29 -3/4-ton Truck Res #204 Moved by H.C. Lawrie Seconded by Mrs. I. Hancey THAT the quotation of Highland Chevrolet Olds I.td. for the purchase of one new 3/4-ton truck, with trade-in, in the sum of $9,394 87 + Licence, be accepted, it being the lowest quotation received. CARRIED. II BRUCE'S MII.I. CONSERVATION AREA -Grist Mill Restoration Consultant's Services Res. #205 Moved by J.S. Scott Seconded by Mrs. N Stoner THAT the consultant firm of I. J Rak Engineering I.td. be retained, for an upset fee of $l,050 00, to carry out a detailed soil investigation in the area of the Grist Mill at the Bruce's Mill Conservation Area CARRIED. l2 BLACK CREEK PIONEER VII.I.AGE VISITOR CENTRE -Building Permit Fee Res. #C06 Moved by Mrs. N Stoner Seconded by Mrs. I. Hancey THAT the City of North York Council be requested to consider waiving the Building Permit fee for the Black Creek Pioneer Village Visitor Centre CARRIED 13 KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme Program Well Drilling Res #207 Moved by M.W H Biggar Seconded by W G. McI.ean THAT the contract for the drilling and casing of a well to accommodate the requirements of the Water Theme and the Renewable Energy Theme Programs at the Kortright Centre for Conservation, be awarded to the firm of Constable Drilling Co., in the maximum amount of $3,225 00, plus applicable taxes CARRIED. l4 KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme Program Water Project Res #208 Moved by M.W.H Biggar Seconded by W G. McI.ean THAT the contract for the fabrication and installation of an in-stream, energy-generating device called "Wing Will", in a weir in the Humber River, as part of the Renewable Energy Theme Program - Water Project at the Kortright Centre for Conservation, in the amount of $l,945 00, be awarded to the University of Toronto, Institute for Aerospace Studies. CARRIED. o . B-242 -10- l5. KORTRIGHT CENTRE FOR CONSERVATION -Renewable Energy Theme Program Solar Project Res. #209 Moved by M W H. Biggar Seconded by W G. McLean THAT the contract for the supply of thermal solar panels for the bee space house, Solar Project, Renewable Energy Theme Program at the Kortright Centre for Conservation, at the estimated price of $2,825 00, plus applicable taxes, be awarded to Watershed Energy Systems. CARRIED. l6. 1984 AUTHORITY MARKETING PLAN Res. #2l0 Moved by: W.G. Mcl.ean Seconded by Mrs. N. Stoner THAT the proposal of Woods Gordon, dated June lO, 1983, for the preparation of the 1984 Marketing Plan, be referred to the Marketing Plan Sub-Committee. CARRIED. l7 FINANCIAl. REPORT AND ACCOUNTS -Month Ending June 30, 1983 Res #211 Moved by J.S Scott Seconded by E. V . Ko1b THAT the Divisional Expenditure Summary for the period June l-June 30, 1983, as appended as Schedule '~" of these Minutes, be received, AND FURTHER THAT paymertt of the Authority accounts, in the amount of $2,049,871 00, be approved. CARRIED. l8 Bl.ACK CREEK PIONEER VILLAGE VISITOR CENTRE -Ground Breaking Ceremony Res. #212 Moved by Mrs. L. Hancey Seconded by M.W.H. Biggar THAT the Chairman of the Black Creek Pioneer Village Visitor Centre Building Sub-Committee, and the Chairmen of the Historical Sites, Information and Education, and Humber Valley Advisory Boards be appointed a committee to make the necessary arrangements for the official Ground Breaking ceremony for the Black Creek Pioneer Village Visitor Centre. CARRIED 19 DECISION OF HEARING -Mr George Hinder City of North York Don River Watershed Res #213 Moved by Mrs L. Hancey Seconded by W G. Barber THAT the application of Mr George Hinder, in accordance with Ontario Regulation l70, for permission to place fill within the fill regulated area of the Don River in the City of North York, be refused for the following reason: .That the application, as submitted, would affect the conservation of land ABSTAINED FROM VOTING MS S NIMMO CARRIED. . , -11- B-243 20. NEW BUSINESS Res. #214 Moved by W.G. McLean Seconded by Mrs. L Hancey THAT Authority staff be instructed to meet with staff of The Municipality of Metropolitan Toronto to discuss (a) the acquisition of the Hinder property, as referred to in the letter dated August 9, 1983, from the Metropolitan Solicitor, (bl the status of land use and zoning designations and their significance to appraisal value, (cl request of the owners for a meeting, (dl appropriate timing for discussions with the Ministry of Natural Resources ABSTAINED FROM VOTING MS. S. NIMMO CARRIED. 2l TERMINATION On motion, the meeting terminated at II 45 am., August lO. Florence Gell W.E Jones Chairman Secretary-Treasurer KC B-244 SCHEDULE "A" REPORT #2/83 OF THE TENDER OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham.Drive, Downsview, on Thursday, July 28, 1983 commencing at ll:05 a.m. to consider the following tender: REHABILITATION OF THE PALGRAVE DAM - TOWN OF CALEDON Present: Mr. J.S. Scott Chairman, Flood Control & Water Conservation Advisory Board Mr. W.E. Jones Secretary-Treasurer Mr. J .C. Mather Staff Mr. R.W. Dewell Staff Mr John Jaffs Consulting Engineer The Committee was advised that nine tenders for the project were received as follows: Contractor Tender Amount Massi Construction Co. Ltd. $38,451.00 Greco Construction $42,726.00 Jim Daly Contracting $47,592.00 M. & A. Building Restoration $50,343.90 Andrew Paving & Engineering Ltd. $52,142.10 Maple Engineering & Construction Co. $52,lS43.00 Lancione Contracting Company Ltd. $54,036.00 Benfil Engineering & Construction $68,251.00 Intrusion-Prepalet Limited $85,467.80 Mr. S. Scott, Chairman of the Flood Control and Water Conservation Advisory Board referred the tender documents to the consultants, Cumming-Cockburn Ltd. , for their review and recommendation. IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT: All tenders received for the Rehabilitation of the Palgrave Dam, Town of Caledon, be submitted to cne Engineering Consultants for their review and report with recommendations to be supplied to the Executive Committee at their meeting on Wednesday, August lO, 1983. J. S. Scott W. E. Jones Chairman Secretary-Treasurer August 3, 1983 RWO L THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY DIVISIONAL EXPENDITURE SUMMARY FOR THE PERIOD JUNE 1, 1983 to JUNE 30, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ $ Finance & Admin (incl. Land Acq.) 3,186,465 26l,172 1,318,957 1,867,508 41.4 Water Resource - Flood Control 2,911,389 l67,5l8 987,316 1,924,073 33.9 Water Resource - Waterfront 2,325,000 266,l70 580,686 1,744,314 25.0 Conservation Land Management 3,548,345 462,027 l,693,606 1,854,739 47.7 Information & Education 2,426,623 182,261 982,436 1,444,187 40.5 Historical Sites 3,912,822 233,214 949,298 2,963,524 24.3 Vehicle & Equipment - Capital Acq 280,730 45,132 118,826 161,904 42.3 \ SUB-TOTAL 18,591,374 1,6l7,494 6,631,l25 11,960,249 35.7 Vehicle & Equipment - Operations -- 19,686 115,532 -- -- Special Projects -- 100,905 335,529 -- -- C.O.E.D 1983/84 2,123,80B 188,614 322,489 1,801,3l9 15.2 Food Services 833,317 123,172 339,582 493,735 40.8 (/l () 2l,548,499 2,049,871 7,744,257 :I: TOTAL -- -- t'l 0 C ~=======~=======~===========g====~=========a==========Cg============= L' t'l lJl I N lJl ~ : U1 ~ B-246 , the metropolitan toronto and region conservation authority minutes REPORT #14/83 EXECUTIVE COMMITTEE 31-AUGUST-l983 #l4/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 31 August, 1983. PRESENT Chairman Mrs. F.E. Gell Vice-Chairman E V. Kolb Members W.G. Barber M.W.H Biggar E. Fulton Mrs L. Hancey H.C. Lawrie S.A. Macpherson Ms. S. Nimmo J S. Scott . ABSENT Member Mrs. N Stoner MINUTES. Res #215 Moved by: W G. Barber Seconded by M.W.H Biggar THAT the Minutes of Meeting #l3/~3 be approved. CARRIED SECTION I NO ITEMS SECTION II FOR CONSIDERATION CORRESPONDENCE Mr W.A. Mcl.ean, Acting General Manager, reported receipt of the following correspondence Letter dated 1983.08 11 addressed to the Chairmen, Conservation Authorities of Ontario from the Deputy Minister of Natural Resources, enclosing a copy of "Preliminary Provincial Policies for Conservation Authorities". Review and comments by Authorities is required by October l4, 1983 Res #2l6 Moved by J.S. Scott Seconded by M.W.H. Biggar THAT the staff be directed to prepare a report and recommendations on "Preliminary Provincial Policies for Conservation Authorities" for consideration by the Executive Committee prior to October l4, 1983 CARRIED. B-247 -2- Mr McLean also stated that in response to requests by the Authority for a meeting with the Minister of Natural Resources concerning such matters as the Waterfront Programme, erosion along the Bellamy Ravine, and the Official Opening of the Bolton channel improvements, advice has now been received that Mr Pope will be available to meet with the Authority from 10 00 a.m to 3 00 p m on Friday, October 14 Since this is the date scheduled for the Preliminary Budget meeting of the full Authority, this meeting will be held at the Bolton Community Centre, commencing at lO 00 a m., and arrangements will be made for Messrs E Fulton and C Mather to tour the Minister by helicopter from his office via appropriate points of interest to Bolton, where he will join the members for luncheon, and officiate at the Official Opening ceremonies. . THE ORDER OF THE AGENDA WAS VARIED AT THIS TIME FOR CONSIDERATION OF THE FOl.l.OWING ITEM 1 BLACK CREEK PIONEER VIl.l.AGE VISITOR CENTRE -Tender Opening A staff report was presented advising that the lowest price received for the Black Creek Pioneer Village Visitor Centre at the tender opening of August l7, 1983, was considerably higher than the funds available A post- contract addendum was distributed to the three lowest tenderers, and the following bids were opened on August 29, 1983 Mitchell Construction l.td. $3,242,339 00 Fairwin Construction $3,318,400 00 Bradsil Limited $3,436,000 00 Res #217 Moved by: E. V Ko1b Seconded by M W H. Biggar THAT the Authority enter into a contract with Mitchell Construction l.imited for the construction of the Black Creek Pioneer Village Visitor Centre at a . cost not to exceed $3,239,839 00, AND FURTHER THAT the architect, Mr Gordon Cheney, be authorized and directed to negotiate with Mitchell Construction l.td to achieve the revised contract price in accordance with the report dated 1983 08 31, adopted by the Black Creek Pioneer Village Visitor Centre Building Sub-Committee, and appended as Schedule "A" of these Minutes CARRrED. 2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION l70 Res 218 Moved by Mrs l. Hancey Seconded by S A Macpherson THAT the applications listed herein as A(l) to A(20) inclusive, be approved, subject to the conditions contained in the reports CARRIED. A(l) City of Brampton To construct asphalt walkway under Elgin Drive bridge crossing the Etobicoke Creek In accordance with the following documents and plans, which shall form part of the permit Sheet #3, Drawing #83-53, prepared by F.J. Reinders & Associates and dated July 1983 A(2) City of Brampton To alter watercourse north of Steeles Avenue, west of Dixie Road (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) Drawings #8250-A-4, 6, 7, 8, and ll, Contract #83-l33, as prepared by Paul Theil Associates Ltd and dated June 1983, (b) Drawing #79l7-B-5, prepared by Paul Theil Associates Ltd -3- B-248 A(3) Ambrosia Restaurant To construct addition to restaurant, south of Dundas Street, east of Southcreek Road, City of Mississauga (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #l, Project #7571, prepared by R.E. Winter & Associates l.td., and dated 1983-07. A(4) Whitehorn Investments l.imited To construct storm sewer outfall to tributary of the Don River, south of Birch Avenue, east of Bathurst Street, Town of Richmond Hill In accordance with the following documents and plans, which shall form part of the permit .Drawing #2, Project #lO-8l005, prepared by Marshall Macklin Monaghan l.td and dated April 1983. A(5) Mr. Barry Cooper To. construct single-fami.ly dwelling at #8 Plymbridge Road, City of North York (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #A-l, A-2, and A-4, as prepared by Keith H. Wagland, Architect. - A (6) Mr Robert M Ogilvie To construct single-family dwelling at #10 Plymbridge Road, City 'Of North York (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #A l, A.2, A 3, and A 5, as prepared by Keith H. Wagland, Architect - ---- - _._- A(7) Town of Vaughan To construct Clark Avenue storm sewer outfall to the Don River, west of Dufferin Street, south of Highway #7 In accordance with the following documents and plans, which shall form part of the permit .Drawing #2 and 12, Project #79~ES-478, prepared by Fred Schaeffer & Associates l.td. A(8) Mr William Tkachuk Too construct gabion basket wall at rear of #l56 Humbervale Blvd., City of Etobicoke (Mimico Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit .The report, and its recommendations, dated April 1983, as prepared by Golder Associates, entitled "Proposed Remedial Works for a Gabion Wall, 156 Humbervale Blvd., Etobicoke, Ontario" . B-249 -4- A(9) City of "Brampton To deepen and widen concrete-lined channel, west of Heart Lake Road, north of Queen Street (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit .Sheets #25, 26, 32, 3, 4, 5, 6, 7, and 8, prepared by the City of Brampton Engineering Department and dated July 1983 A(lO) Fogliato Investments l.td To alter tributary of the Etobicoke Creek, north of Sismet Road, east of Dixie Road, City of Mississauga In accordance with the following documents and plans, which shall form part of the permit .Sheets land 2, as prepared by Tom Drzic Ltd. and dated July 1983 A(ll) The Municipality of Metropolitan Toronto To construct two pedestrian bridges crossing the Black Creek, south of Shoreham Drive, east of Jane Street, City of North York (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit: .Drawing Nos. 1 to. 4 inclusive, Project #83-17, prepared by Johnson, Sustronk, Weinstein & Associates A(l2) Mr. Robert W. l.ucas To build timber retaining wall, with related filling, rear of #69 Satok Terrace, City of Scarborough (Highland. Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit .Project #l83, dated June 1983, Drawing #1, prepared by D S. l.andscape Designs A(l3) Mr Luca Tesa To construct temporary stand for fruit and vegetables on flood plain of the Humber River, l.ots 3 & 4, Concession VII, Town of Vaughan In accordance with the following documents and plans, which shall form part of the permit .The plan as prepared by Ron Mauti, Architect. A(14) Revenue Properties Central Developments l.td. To construct outfall into the Miller's Creek channel, Rotherglen Road, south of Highway #2, Town of Ajax (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawings #Al-83707-Pl, P3, and G-l, dated February 1983, by Proctor & Redfern Ltd -5- B-250 A(15 ) City of Scarborough To construct diversion of the Morningside Tributary of the Rouge River, Staines Road/Ontario Hydro Corridor In accordance with the following documents and plans, which shall form part of the permit .Borough of Scarborough Contract 514, Drawings 4408-Cl to Cll, 4408-S1 to S9, and 440B-Ll to L4, prepared by Andrew Brodie Associates Inc. , Cole Sherman & Associates l.td., and Paul D. Ferris Associates A(l6 ) Mr. Vince Verducci To alter watercourse, north of Birch Avenue, east of Bathurst Street, Town of Richmond Hill (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit .The cross section and site plan prepared by Mr. Vince Verducci. A(171 Mr. Joe Pulla To place within regulated area, north of Oxford Street, east of Bathurst Street, Town of Richmond Hill (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit .Drawing #l prepared by S. Mahut. A(l81 Venturin Development Corporation l.td. To carry out temporary diversion of New Westminster Creek, south of Highway #7, east of Dufferin Street (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Dr awing Nos Pl, P4, P6, P15, and P20, Project #lO-B2097, prepared by Marshall Macklin Monaghan l.td A(l91 Town of Vaughan To alter channel of New Westminster Creek, east of Dufferin Street, south of Highway #7 (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit .Drawing Nos P2 to P6 inclusive, Project #10-83025, prepared by Marshall Macklin Monaghan l.imited. A(20) Town of Vaughan To construct pedestrian and vehicular access road, south of Glen Shields Road, west of Dufferin Street (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing No BOl8-A-l3, as prQpared by Paul Theil Associates. I I B-25l -6- 3 Bl.ACK CREEK PIONEER Vll.l.AGE -Proposed pond vicinity of the Nesbitt Sawmill Res. #2l9 Moved by M W H Biggar Seconded by S A. Macpherson THAT the construction of a detention pond, which will serve the Nesbitt Sawmill at the Black Creek Pioneer Village, be approved, AND FURTHER THAT the necessary and appropriate storm sewer easements be conveyed to the Town of Vaughan for a nominal fee. CARRIED. 4 HUMBER RIVER CHANNEl. IMPROVEMENTS - FORMER VILl.AGE OF BOl.TON, PHASE II -Extra Work Order #1 Res. #220 Moved by M.W.H. Biggar Seconded by S.A. Macpherson THAT Extra Work Order #l to the contract for Humber River Channel Improvements - forme~ Village of Bolton, Phase II, be approved, AND FURTHER THAT approval of the Ministry of Natural Resources be requested CARRIED. 5 HUMBER RIVER CHANNEl. IMPROVEMENTS CONTRACT - PHASE II -Extra Work Orders #8 & #9, and Revised Extra Work Orders #2 & #5 Res #22l Moved by M.W.H Biggar Seconded by S.A. Macpherson THAT revised Extra Work Order Nos. 2 and 5, and additional Extra Work Orders Nos. 8 and 9, in the amounts of $3,493 89, $l,lOO.OO, $2,500 00, and $2,202.10 respectively, be approved, AND FURTHER THAT the approval of the Ministry of Natural Resources be requested. CARRIED. 6. l.AND ACQOIS.ITI0N PROJECT 1982-l984 HUMBER RIVER WATERSHED -Property: The Corporation of the Town of Caledon Between Humber Lea Road and Queen Street, Bolton Res. #222 Moved by M.W.H. Biggar Seconded by: S.A. Macpherson THAT the report (August 12, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase CARRIED. Re Project Land Acquisition Project 1982-l984 - Fl"ood Plain & Conservation l.and Component: Humber River Watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property West side Humber l.ea Road Owner The Corporation of the Town of Caledon -7- B-252 Area to be acquired 4.l53 acres, more or less Recommended purchase price Nominal consideration of $2 00, plus costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of l.ots l6l, l8l, Block 1, Part of l.ot 24, Block 5, Plan BOl.-7, and Part of Lots Ie' , 30, 37, and 39, Plan BOl.-9, Town of Caledon (The ReC)tiona1 Municipality of Peel), located between Humber Lea Road and Queen Street, in the Bolton area. "Negotiations have been conducted with The Corporation of the Town of Ca1edon, and, subject to the approval of your Committee, agreement has .been reached with respect to a purchase price, as follows The purchase price is to be the nominal sum of $2.00, plus costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive con- veyance of the land required free from encumbrance, with the exception of existing service easement "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-ll-40l - Flood Plain l.and Acquisition." . 7 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property The Regional Municipality of Peel East side Highway #50, Town of Caledon Res. #223 Moved by: M.W H. Biggar Seconded by S.A. Macpherson THAT the report (August 23, 1983l set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase of the Permarient Easement CARRIED. "Re Project Land Acqwisition Project 1982-l984 - Flood Plain & Conservation Land Component Humber River watershed Auth9rity Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property East side Highway #50 OWner The Regional Municipality of Peel Area over which a permanent easement is to be acquired o 02 acres, more or less Recommended purchase price: Nominal consideration of $2.00, plus legal and survey costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lot 'e' , Plan BOl.-9, Town of Caledon (The Regional Municipality of Peel), located east side of Highway #50 "Negotiations have been conducted with officials of The Regional Municipality of Peel, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows I B-253 -8- The purchase price is to be the nominal sum of $2 00, plus legal and survey costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase of a permanent easement, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing, for legal costs and disbursements, are to be paid. "The acquisition of this easement is required to facilitate construction of the Bolton Flood Control works. "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-ll-401 - Flood Plain Land Acquisition." 8. l.AND ACQUISITION PROJECT 1982-1984: HIGHl.AND CREEK WATERSHED -Property The Municipality of Metropolitan Toronto West side Morningside Avenue, north of l.awrence Avenue, City of Scarborough Res. #224 Moved by M.W.H. Biggar Seconded by S.A. Macpherson THAT the report (August 15, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED "Re Project l.and Acquisition Project 1982-1984 - Flood Plain & Conservation l.and Component Highland Creek watershed Authority Executive Resolution #88, Meeting #~ - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property West side Morningside Avenue, north of Lawrence Avenue Owner The Municipality of Metropolitan Toronto Area to be acquired 1 9Z8 acres, more or less Recommended purchase price: Nominal consideration of $2 00, plus costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of l.ot ll, Concession I, and Part of Parcel IAI _ Registered Plan 441, City of Scarborough (The Municipality of Metropolitan Toronto), located on the west side of Morningside Avenue, north of Lawrence Avenue. "Negotiations have been conducted with officials of The Municipality of Metropolitan Toronto, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the nominal sum of $2.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs, and disbursements, are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-l1-401 - Flood Plain l.and Acquisition." -9- B-254 9 l.AND ACQUISITION PROJECT 1982-l984 HIGHLAND CREEK WATERSHED -Property City of Scarborough South of Sheppard Avenue East, west of l.apsley Road Res #225 Moved by M.W H Biggar Seconded by: S.A Macpherson THAT the report (August 11, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase CARRIED. "Re Project Land Acquisition Project 1982-l984 - Flood Plain & Conservation Land Component Highland Creek watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property South of Sheppard Avenue East, west of Lapsley Road OWner City of Scarborough Area to be acq~ired 0 34l acres, more or less Recommended purchase price Nominal consideration of #2.00 "Included in the requirements for the above-noted project are two irregularly- shaped parcels of land,being All of Blocks 'F' and 'H I, Plan M-l5l7, City of Scarborough (The Municipality of Metropolitan Toronto), south of Sheppard Avenue East, west of l.apsley Road "Negotiations have been conducted with the City of Scarborough, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal sum of $2 00, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs, and disbursements, are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-l1-40l - Flood Plain l.and Acquisition " I B-255 -10- lO. l.AND ACQUISITION PROJECT 1982-l984 HIGHl.AND CREEK WATERSHED -Property William G. Tredway & Mary F.S. Miller South side l.awrence Avenue, west of Centennial Road, City of Scarborough Res. #226 Moved by M.W.H. Biggar Seconded by: S.A. Macpherson THAT the report (August 24, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED. "Re Project: l.and Acquisition Project 1982-l984 - Flood Plain & Conservation l.and Component: Highland Creek Watershed Authority: Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May l5, 1981 Subject property South side l.awrence Avenue OWners William G. Tredway & Mary F.S. Miller Area to be acquired 2.926 acres, more or less Recommended purchase price $12,000.00, plus vendors' legal costs "Include in the requirements for the above-noted project is an irregularly- shaped parcel of land, being All of Block tAl, Plan M-l980, City of Scarborough (The Municipality of Metropolitan Toronto), located on the south side of l.awrence Avenue, west of Centennial Road,.being a partial taking from the original Tredway homestead "Negotiations have been conducted with the owners and their solicitor, Mr. Tom A. Newman, Q.C. , 27 Queen Street East, Toronto, Ontario, MSC 2M6, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be $l2,000.00, plus vendors' legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs, and disbursements, are to be paid. The Authority is to receive con- veyance of the land required free from encumbrance "This property is being purchased on a basis that will allow for a 1984 closing date, if required "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. "Funds are available for this acquisition - Account 0-04-11-401 - Flood Plain l.and Acquisition " 11 QUOTATION #Cl.M83-33 -Cross-Country Ski Equipment The following quotations were received for the supply of cross-country ski equipment for the rental operations at the Albion Hills and Bruce's Mill Conservation Areas _11- B-256 Skis Boots Poles Bindings Karhu-Titan l.td 59 pro @ - - 75 pr @ $44 BO $5 00 3 pr @ $26 40 Vikski Canada l.td 59 pro @ 75 pro @ 46 pro @ 75 pr @ $41 00 $19.95 $5.95 $5 lO 3 pr @ 7 pr @ 5 pr @ $30.00 $1B 95 $5.60 Ruko of Canada - - 51 pro @ - $5.50 Nishizawa Sports 59 pr @ 3l pro @ 46 pr @ 75 pr @ $42 00 $27.50 $7.00 $5.65 3 pr @ 51 pro @ 5 pr @ $34 20 $25 00 $3 BO Res. #227 Moved by: H C. l.awrie Seconded by W G Barber THAT the following quotations for the supply of cross-country ski equipment, in replacement of damaged or worn-out equipment, be accepted Vikski Canada Ltd for 59 pairs of X-C skis at $4l.00 a pair, and 3 pairs of X-C skis at $30 00 a pair, Vikski Canada Ltd for 75 pairs of X-C boots at $l9 95 a pair, and 7 pairs of X-C boots at $18 95 a pair, Ruko of Canada for 5l pairs of X-C poles at $5 50 a pair, Karhu-Titan Ltd for 75 pairs of bindings at $5 00 a pair Total acquisition, including Federal Sales Tax = $4,793 40 CARRIED. l2 QUOTATION #CLMB3-30 Albion Hills Conservation Area Washroom - Hydro Service The following quotations were received for the supply of equipment, labour, and materials for the above-noted installation. Jack Langen Electric l.imited $3,125.00 Sturdy Power l.ines $3,634.00 (excluding ProvinciaL Sales Tax) Res. #22B Moved by H.C. l.awrie Seconded by W G. Barber THAT the quotation of Jack l.angen Electric l.imited, for the supply of equipment, labour, and materials for the installation of a 200 amp service for the Albion Hills Conservation Area washroom, in the sum of $3,l25 00, plus Provincial Sales Tax, be accepted, it being the lowest quotation received CARRIED. B-257 -12- 13 QUOTATION #CLM83-32 Indian Line Campground Superintendent's Residence - Trusses The following quotations were received for the supply of pre-fabricated trusses for the above: Cadillac Building Products $l,4l6 00 Arnold Lumber $l,500.00 Woodbridge l.umber $l,600 00 ) (excluding Provincial Sales Tax) Res. #229 Moved by: H.C. l.awrie Seconded by W.G. Barber THAT the quotation of Cadillac Building Products, for the supply of pre- fabricated trusses for the Superintendent's residence - Indian l.ine Campground, in the sum of $1,4l6 00, plus Provincial Sales Tax, be accepted, it being the lowest quotation received. CARRIED l4 Al.BION HILLS CONSERVATION FIEl.D CENTRE -Ontario Building Code Update & Dormitory Re-design Proposal - Plumbing and Bathroom Fixtures The following quotations have been received for the above Solar Plumbin~ Limited $11,078 00 Maurice Breen l.td. $l2,223 69 Walter l.ong Plumbing l.td. $12,500.00 Res #230 Moved by Mrs. l.. Hancey Seconded by H.C. l.awrie THAT the proposal of Solar Plumbing l.imited, to modernize the plumbing and bathroom fixtures at the Albion Hills Conservation Field Centre, in the amount of $ll,078.00, be accepted, it being the lowest quotation received CARRIED l5. KORTRIGHT CENTRE FOR CONSERVATION -Land Theme Demonstration Building Flooring The following quotations were received for concrete flooring (labour and materials) : Franore Drain & Concrete Ltd $6,025 00 Plastina $6,500.00 Belvedere Drain & Concrete l.td. $6,850.00 Res. #23l Moved by Mrs L Hancey Seconded by: H C. Lawrie THAT the quotation of Franore Drain & Concrete Ltd. for the supply and installation of concrete flooring at the Land Theme Demonstration Building, Kortright Centre for Conservation, in the amount of $6,025 00, be accepted, it being the lowest quotation received CARRIED -13- B-258 l6 REPORT #3/83 - TENDER OPENING SUB-COMMITTEE -Black Creek Pioneer Village Visitor Centre The following tenders were received on August 17, 1983, for the construction of the Creek Pioneer Village Visitor Centre Contractor Tender Amount Fairwin Construction $3.856,000 00 Mitchell Construction l.td 3.889,356 00 Bradsil l.imited 4,057,000 00 Buttcon Construction Ltd. 4,085,000 00 Q-Sons Construction Co l.td. 4,l23,000 00 Manville Development Corp 4,278,000.00 Big H. Construction 4,300,000 00 Harbridge & Cross Ltd. 4,318,000 00 Perwin Construction Co Ltd. 4,470,000 00 Skycon Construction 4,661,000 00 Res #232 Moved by Mrs L. Hancey Seconded by J S Scott THAT Report #3/83 of the Tender Opening Sub-Committee be received. CARRIED l7 REPORT #4/83 - TENDER OPENING SUB-COMMITTEE -Bluffers Waterfront Park: Phase II Road and Parking Lot Paving The following tenders were received for the asphalt paving of the roadway and parking lot to the easterly end of Bluffers Waterfront Park - Phase II development Contractor Tender Amount Empire Paving l.td. $46,420 00 D Crupi & Sons Ltd $47,500 00 Andrew Paving & Engineering l.td $48,800 00 Associated Paving Co l.td 549,414 00 Ferpac Paving Inc $50,920 00 Miller Paving l.td. $51,l04 30 Fermar Paving l.td. $53,213 20 Newport Paving & Construction $55,999 00 Warren Bitulithic l.imited $56,158 00 Aurostar Inc $73,800 00 Res #233 Moved by Mrs l. Hancey Seconded by S.A Macpherson THAT Report #4/83 of the Tender Opening Sub-Committee, as appended as as Schedule "B" of these Minutes, be received, THAT the tender of Empire Paving l.imited, in the amount of $46,420 00, for Contract 83-01, Site Paving at Bluffers Waterfront Park - Phase II, be accepted, it being the lowest tender, AND FURTHER THAT approval of the Province of Ontario be requested CARRIED B-259 -14- l8 REPORT #2/83 - MARKETING Pl.AN SUB-COMMITTEE Res. #234 Moved by M W H. Biggar Seconded by Ms S Nimmo THAT Report #2/83 of the Marketing Plan Sub-Committee, together with the proposal of Woods Gordon, Management Consultants, dated August l7, 1983, for the preparation of the 1984 Marketing Plan, as appended as Schedule "C" of these Minutes, be received, THAT the proposal of Woods Gordon. dated August 17, 1983, for the preparation of the 1984 Marketing Plan, in the amount of $9,000 00, be accepted, AND FURTHER THAT an additional maximum amount of $2,500 00 be provided for a one-day workshop CARRIED 19 STAFF FINA~CIAl. PROGRESS REPORT -April l/June 30, 1983 Res #235 Moved by Mrs l. Hancey Seconded by J.S Scott THAT the Staff Financial Progress Report for the period April l-June 30, 1983, as appended as Schedule "0" of these Minutes, be received CARRIED 20 AMO REPORT 83-5 -Reform and Revision of Conservation Authorities in Ontario Res #236 Moved by M.W H Biggar #I Seconded by Mrs l.. Hancey THAT AMO Report 83-5 - Reform and Revision of Conservation Authorities in Ontario, together with correspondence received from the Executive Director, The Association of Conservation Authorities of Ontario, under date of August 8, 1983, be received, AND FURTHER THAT staff be directed to prepare a report in this connection for consideration of the Executive Committee CARRIED 21 TERMINATION On motion, the meeting terminated at II 35 am., August 3l Florence E Gell W.E Jones' Chairman Secretary-Treasurer KC B-260 SCHEDUl.E "A" To The Black Creek Pioneer Village Visitors Centre Committee From Mr Emil Kolb, Chairman Re Tender The lowest price received for the Black Creek Pioneer Village Visitors Centre received on the tender call of August 17, 1983, was $3,856,000 from Fairwin Construction Company Since this was considerably higher than the funds available, the architect, Mr Gordon Cheney, was asked to distribute a post-contract addendum to the three lowest tenderers which changed or removed the following items from the tender price 1 Change the roof from a sloping surface to a flat surface. 2 Have the Authority staff cut down the trees on the site 3 Change the window sills from precast concrete to aluminum 4 Remove the dumb waiter 5 Have the Authority carry the fire insurance. 6 Reduce the quality of the panic door hardware 7. Reduce the hardware allowance by $10,000. 8 Remove the labour and material bond (since replaced) 9. Allow the contractor to use a portable classroom as an office. 10 Change the ceiling boards from maple to pine. 11 Reduce the costs of certain electrical fixtures l2 Reduce the costs of certain mechanical equipment (since replaced) 13 Remove the kitchen equipment from the contract and pay for it through a lease-purchase agreement at a cost of approximately $350,000 over 5 years. 14 Remove the pond and artificial ice rink and equipment. The post-contract aJdendum was received on Mon.,August 29th, and the low price was from Mitchell Construction Limited at $3,242,339 Fairwin's price was $3,318,400 and Bradsil's was $3,436,000 The architect is of the opinion that the $20,000 allowed by the mechanical contractor in the post~contract addendum is very low and should be put back into the contract There is a further savings of $24,000 that can be made by changing the roof structure from a membrane to a built-up tar and gravel surface Other minor changes can be made to reduce the price by $5,000 It is felt that the labour and material payment bond should be kept in the contract at a cost of $6,500 It is proposed that $37,000 be taken from the contingency fund and used as revenue Total interest from revenue funds is estimated at approximately $60,000 and will form the contingency fund. Statement of Revenues & Expenditures Revenues Member Municipalities $ 600,000 Wintario 530,000. r.ottario 1,250,000. McNair Estate (as ~er solicitor's letter) 450,000 Other estate funds and donations already received by the M.T R C F 100,000 Funds pledged by the M T R.C F 633,000. Funds from the contingency (interest) 37,000. $3,600,000 B-26l .. 2 - Expenditures Mitchell quote $3,242,339 Replace deleted mechanical items 20,000 Savings on roof structure (24,000 ) Savings on other minor changes (5,000 ) Increase for labour & material payment bond 6,500. Mitchell Contract Price $3,239,839 Allowance for landscaping 10,000. Architect's fees 250,000. Allowance for furnishings 100,000. $3,599,839. Recommendation IT IS RECOMMENDED THAT the Authority enter into a contract with Mitchell Construction Limited for the construction of a Visitors Centre at Black Creek Pioneer Village at a price not to exceed $3,239,839 . 1983.08 31 B-262 SCHEDULE "B" REPORT H/83 OF THE TENDER OPENING Sua-COMMITTEE The Tender Opening Sub-Committee met at the A.uthority- Office, 5 Shoreham Drive, Downsview on Monday, A.ugust 29, 1983 commencing at 2 00 pm, to consider the following tender: CONTRA.CT 83-01 SITE PAVING A.T BLUFFERS P1\RK - PHA.SE II-, SCARBOROUGH PRESENT WERE: Staff W. E. Jones J. C. Mather B. E. Denney N. B. Cowey The Committee was advised that ten tenders for the project were received, as follows Contractor Tende'r '.Al1lount Empire Paving Ltd $46,420 00 D Crupi & Sons. Ltd $47,500 00 Andrew Paving & Engineering Ltd $48,800.00 Associated Paving Co Ltd. $49,414.00 Ferpac Paving Inc. $50,920.00 Miller Paving Ltd $51,104.30 Fermar Paving Ltd. $53,213 20 Newport Paving & Construction $55,999.00 Warren Bitu1ithic Limited $56,158 00 A.urostar Inc $73,800.00 Mr W. E. Jones referred the tender documents to the staff for their review and recommendation. IT WAS A.GREED AND THE COMMITTEE RECOMMENDS THA.T All tenders received for Contract 83-01 Site Paving at Bluffers Park Phase II be submitted to the staff for their review and report, with recommendations to be supplied to the Executive Committee at their meeting to be held on Wednesday, August 31, 1983 W. E Jones J. C. Mather, Administrator Secretary-Treasurer Water Resource Division 1983 08 30 NC/rnd . ,B-263 SCHEDULE lie" .& A MEMBER OF ARTHUR YOUNG INTERNATIONAl. Woods Gordon Management Consultants PO, Box 251 Royal Trust Tower T orontc-DormnlOn Centre Toronto. Canada MSK lJ7 Telephone: (416) 864.1212 Telex' 06-23191 August 17, 1983 Mr Peter Head Acting Administrator Information and Education Division Metropolitan Toronto and Region Conservation Authority 5 Shoreham Drive Downsview, Ontario M3N IS4 Dear Peter Your recent discussions with us have indicated the desirability of presenting the Marketing Sub-Committee with a fuller elaboration of our proposed approach to the development of the 1984 marketing plan We appreciate the need to have the Sub-Committee understand explicitly what the process and outputs are intended to be Since our original letter of July 10, new ideas have come to light which we are anxious to incorporate into the study process In this revised proposal letter, we include these suggestions as well as elaborating upon our suggested methodology Our approach is predicated upon two positions ~, we feel that there will be an urgent need to move directly from the current survey work and analysis into the development of the marketing plan As the Sub-Committee knows, we have been closely involved with the survey work thus far, and will be directing the analysis of same The survey was specifically designed to address some key areas that will be critical to the 1984 marketing plan; our intimate B-264 &. - 2 - Woods Gordon knowledge of the data will be essential to its proper development ~, we believe strongly that the marketing plan should be developed by the Authority rather than by outside consultants Accordingly, our approach builds to a large degree upon the wisdom and experience of the members of the Marketing Sub-Committee (As we 11, Ms Nemo's ideas of obtaining the input and advice of outside individuals who might have especially useful insights is an excellent one We wi 11 incorporate this into our approach as well ) Under our guidance, Authority staff will actually prepare the plan This approach will ensure that the marketing plan is sensitive to the organizational/political structure of the Authority, as well as responsive to the real needs of ~ the Authority and its user base We have reviewed the 1983 marketing plan in detail We are pleased to see the Authority adopting the basic philosophy and approach that we outlined in our Marketing Plan report of 1982 The 1984 marketing plan should continue the basic thrust and orientation of this marketing effort The 1984 plan should consist of actions that the Authority will undertake in five criticai areas 1) product 2) price 3) promotion 4) delivery 5) research, monitoring and control Further, the marketing plan must be specific to each of the Authority's faci 1 i ties There will be a number of key tasks involved in our efforts to assist you prepare this marketing plan The sequence of these tasks, as well as their interrelationship with the summer survey work now in progress, is shown on B-265 - 3 - ~ Woods Gordon the attached flow chart diagram Also on this diagram we show the expected division of work between Woods Gordon and Authority staff. Appended to this flow chart diagram is a detailed description of each task including the rationale for the task, a description of the task, the responsibility of the consultants, and the specific outputs resulting from the task The budget required for this marketing plan work will remain at $9,000 for both fees and expenses This assumes that any costs associated with the hiring of outside individuals fOt: the proposal workshop/"brainstorming" session will be paid directly by the Authority This budget allows for two meetings, namely a one-day meeting session with Authority Personnel at our offices and the workshop day outlined in the attached pages The individuals participating in the developing of the marketing plan will be Messrs McClew, Reece and Linton, who were all involved in the developing of the 1982-1983 marketing plan Resumes for these individuals were appended to our July 10 letter We appreciate the need to begin this work as soon as possible I look forward to discussing this plan with the members of the Marketing Sub-Committee on the morning of August 19th With best regards, ~. M.J McClew Partner cc J D Linton S E Reece J D R Watson M.T.R.C.A. 1984 MARKETING PLAN PROPOSED DEVELOPMENT PROCESS /".--..., I G~~N \ I ADVICE AND I \ LIAISON I \ / ...... - ". ~~:\ ~<r' /",0 'o~__ ~\.. AS ,,~ \ o "ODDS GORDON TASK' o AUTHORITY TAlKS o TASKS THAT ARE 'ART OF IlUMMER SURVEY WORK Ol I N en en 8-267 I INITIAL DISCUSSIONS WITH AUTHORITY PERSONNEL Rationale In order to ensure that the 1984 Marketing Plan is practical and possible, it will be necessary to determine important constraints governing the activities of the Authority over the coming years as well as to firmly establish the expectations of the Marketing sub-committee concerning the critical areas to be addressed These will include - capital budget available to make facility improvements - expected increase (if any) in Authority's operating budget - reaction to 1983 marketing plan - any anticipated organizational changes in the Authority and their implications - any areas or facilities thought to be especially in need of improvement To obtain this information, we propose to hold discussions with various Authority personnel These will include all members of the Marketing Sub-Committee, as well as any other Authority members and staff recommended by the Sub-Committee Description These sessions would be short, one-on-one interviews, where the consultants would personally discuss the limitations and desirable direction of the 1984 Marketing Plan with Authority personnel To the extent possible, we would prefer to hold these sessions at our offices Consultant Responsibilities: Woods Gordon will be responsible for holding these interview sessions as well as recording and collecting data We expect that Authority staff would actually set up and arrange the interviews B-268 - 2 - Outputs Aside from working notes kept by the consultants, there will be no physical outputs from this task - B-269 - 3 - 2 REVIEW OTHER RELEVANT INFORMATION Rationale: In addition to the valuable research findings previously discussed, there will be other useful sources of information that will have a bearing upon the development of a marketing plan for the MTRCA (an obvious example is the annual survey data collected by the Metropolitan Toronto Visitor's and Convention Bureau) In this task we will examine such available data Descript ion: We will consult a number of sources to obtain data on tourist and recreation trends that might be relevant to the development of the marketing plan for MTRCA. These include - CGOT, Ministry of Tourism and Recreation - Culture and Recreation Master Plans - Our own recreation and tourism work - Other data sources (eg Visitors and Convention Bureau) Any relevant findings from this review will be fully documented Consultant Responsibility: This task will be entirely the responsibility of Woods Gordon Outputs Each information source will be fully documented In addition, for each, we will list what, in our judgement, are the implications of the information in terms of the critical elements of product, price, promotion, delivery and research of the marketing plan This documentation will then be given to Authority staff for their preparation of the marketing plan - B-270 - 4 - 3. DEVELOP OUTLINE MARKETING PLAN Rationale: In order to ensure that the 1984 Marketing Plan (which is to be prepared by the Authority) is comprehensive and addresses basic questions, we will prepare a marketing plan outline which will specify the format of the marketing plan, the areas to be addressed, and the key questions to be answered (arising from both the interviews with Authority personnel as well as the review of other data and the results Qf the summer survey) Description: The format of this marketing plan outline will consider the basic product, price, promotion, delivery and researc~ aspects for each Conservation area and facility Where a number of solutions and options are possible, we will present these for consideration by Authority personnel, along with our suggestions and/or ranking for each Consultant Responaibility: This task will be entirely the , responsibility of Woods Gordon --- - - - -- -- -- Outputs The specific output from this task will be a "skeleton" marketing plan It will reflect the ultimate format for the plan, and contain a number of questions, key points, etc B-271 - 5 - 4 WORKSHOP/"BRAINSTORH" SESSION Rationale After initially sorting out our ideas and questions in the development of the outline marketing plan, it will be useful to discuss and re-think these aspects, as well as to obtain some fresh viewpoints on matters To do this we propose a one-day "brainstorm" or "think tank" session Description: The session, as we view it at this point in time, would consist of a two-part day, held in Woods Gordon's Toronto offices The morning would be devoted to a workshop session, attended by various outside experts who could act as 'resource' or 'idea' people The morning session would be hosted by Woods Gordon, who would lead discussion on a number of points and questions that have emerged up to this point in the process This morning session would, of course, be attended by members of the Marketing Sub-Committee, as well as by selected Authority personnel After a luncheon (arranged by the Consultants) the external resource people will leave, and the bulk of the afternoon will be devoted to a full discussion of the Marketing Plan outline and any revisions or modifications as a result of the morning session The basic objective of this afternoon session will be to obtain agreement among the marketing plan Sub-Committee members as to the outline marketing plan Consultant Responsibilities The consultants will be responsible for sponsoring and hosting this session Authority personnel will be responsible for making the necessary scheduling arrangements With respect to obtaining outside experts, we expect that the Authority ... . B-272 - 6 - will identify persons it feels could make a worthwhile contribution to this brainstorm session We expect to be involved in this process to a reasonable extent Outputs Full notes will be taken during the morning and afternoon sessions A major physical output will be a listing of the ideas, suggestions and comments that emerged from this session Another physical output will be a revised Marketing Plan outline, based upon the comments at the afternoon session '- B-273 - 7 - s. PREPARATION OF KARKETIRG PLAN Ratiouale At this point, a number of relevant materials will have been developed, including the results from the summer survey, a review of other relevant information sources and an assessment of their implications, and the marketing plan outline This information will be critical to Authority staff in the development of a first draft of the 1984 Marketing Plan This, of course, represents the final and most important output of this entire process Description: The sequence of events that we foresee in this task is straightforward Authority personnel will initially prepare the first draft of the 1984 Marketing Plan, following the marketing plan outline previously identified and responding to all questions raised Woods Gordon will then review this initial draft, suggesting changes, modifications, areas for further elaboration, etc , as appropriate Authority staff will then prepare a final version of the Marketing Plan Consultant Responsibility: The consultants will, of course, remain "on call" throughout this process Our responsibility will not be to prepare the Marketing Plan; rather it will be to aid and advise the Authority in their preparation of the plan Outputs The output of this task will be a detailed, comprehensive and relevant 1984 Marketing Plan This product will be assured by virtue of the nature of the study process undertaken B-274 SCHEDULE "D" To The Chairman and Members of the Executive Committee, M T R.C A. From Mr. R. K Cooper, Administrator, Historical Sites Division Re Progress Report - April 1 to June 30, 1983 HISTORICAL SITES PROJECTS (Development) Landscape work at the Sawyer's House has been started with the laying of new boardwalk and the planting of two trees. Interior restoration in the Richmond Hill Manse is progressing well. During April, May and June the building was fully insulated, wired, lathed and plastered The wood trim was installed and the interior is now ready for painting and decorating. HISTORICAL SITES PROJECTS (Operations & Maintenance) (a) Registration and Artifacts During the period April 1st to June 30th, a total of fifty-nine items were accessioned from eighteen donors One interesting donation was a mechanical toy bank and several old coins Another notable donation was a handmade Windsor style arm chair from the Uxbridge area Several items from the Black Creek collection were loaned for an exhibit relating to an archaeological dig in downtown Toronto The Registrar has had the assistance of a C 0 E D employee and a student on the Experience '83 Program (b) Publicity and Promotion During the second quarter of 1983 the Village was the locatton for several commercial photography projects. The Mill was used for the cover of a book on Canadian wine~ a segment of a documentary on the Earl of Selkirk was filmed by C B C., Vancouver~ Stedman's photographed a fashion 1ayout~ Eaton's shot the cover picture for their Christmas Gift Catalogue in Burwick House kitchen~ and Sears used several outdoor locations for their Fall Fashion Flyer The Village received newspaper coverage during April, May and June from the three Toronto dailies, as well as from many of the area weeklies Jeanne Hughes was interviewed on C.B C Fresh Air, and on C F G M. Lorraine O'Byrne was interviewed on C K.Q T. Oshawa. - Vil1age~staff have given numerous lectures and talks during the second quarter of 1983 Mrs. Jeanne Hughes presented talks to the staff and volunteers of Century Village, Lang; Hutchison House, Peterborough~ and to the Mono Mills Historical Society Mrs Hughes also spoke at Ontario Historical Society seminars on Ontario's Bicentennial at Smiths Falls, Toronto, London, and at the Annual Meeting of the Ontario Historical Society in Sudbury Mr Cooper attended the Provincial Bicentennial Conference sponsored by the Ontario Heritage Foundation He was a guest speaker at the Pennsylvania German Folklore Society Annual Meeting, and was interviewed about the Village on radio by Tommy Thompson. He also partic~pated at tfie official opening of The B. Napier Simpson Jr Room at a Thornhill community centre. In June The Metropolitan Toronto and Region Conservation Authority hired a promotions officer for Black Creek. The successful candidate, Neil Beaudry, is to begin work on July 4th (c) Special Events A large n~ of special events were held at Black Creek during April, May and June. The Village opened in March with the Taste of Maple program, and has held a progression of special events since then. They include (i) Co1ourfu1 Coverlets, a two week display of nineteenth century bed coverings highlighted by the Canada Packers' Quilt Exhibit (ii) The Great Easter Egg Hunt held on Easter Sunday The Ontario Egg Producers Marketing Board donated 100 dozen eggs, and several major candy companies donated the chocolate and candy treats , B-275 - 2 - (iii) Past-times -- Play-times, a weekend of nineteenth century amusements providing visitor participation. A kite fly-in sponsored by the Ontario Historical Society was one of the highlights of this program (iv) A Spring Fair, which featured a medicine man, jugglers, side- shows and agricultural exhibits (v) Dr. Zebediah Zonk's Museum of Scientific Curiosities displayed in the Town Hall. (vi) Military Manoeuvres on Victoria Day weekend featured a forty person Colonial Fife and Drum Corps from Michigan. (vii) Wonderful Wool highlighted sheep shearing and wool processing for two weekends. (viii) Making Wood Work in Pioneer Ontario emphasized the variety of uses to which the early settlers put wood. (ix) The lOth Annual Rogationtide Service was held on June 19th. Bishop Allan Read led the Service, and The Honorable Pauline McGibbon, Honorary Reeve of Black Creek, participated in the ceremonies. Several of these events were new programs in 1983 However, it is difficult to measure their success as very wet weather throughout April and May deterred many visitors. During the second quarter of 1983, lS.weddings, 12 wedding receptions, 1 Christening and 1 Church service were held. td) Building and Grounds Maintenance - Maintenance during April, May and June included rebuilding and repairing several sections of rail fences, repairing several sections of boardwalk; repairing the steps at Roblins' Mill and Dickson Hill School; grading all Village roads; cleaning hydro transformers; repairing the culvert at the Harness Shop, and repairing wheelchairs During the same period regular grass cutting has been maintained in the Village, the Peacock Woods and at Head Office Six Osage orange trees have been planted at the Mackenzie House barn area The Snack Bar has been scraped and painted and the surrounding area re-sodded or gravelled. Fans have been installed to help control insect problems. The picnic tables have been repaired and restained and garbage barrels painted. A new sign was installed at Keele Street and Stee1es Avenue The Village parking lot has been re-1ined and curbs painted Lockers were repaired and painted and set up for C 0 E D. staff On June 28th the old skate shack/storage building in the lower parking lot was set on fire and burned to the ground The area has been cleaned up and all debris removed. (e) Livestock The Spring season at Black Creek was busy in the livestock section. Twenty lambs were born, eight goslings, fifteen ducklings, sixty chicks, twenty turkey poults and one bull calf Purchases included one cow, eight piglets' and one turkey gobbler; while two ewes and four pigs were sold (f) Visitors Centre The Province of Ontario, through Lottario, has approved a grant of $1,250,000 00 which will make it possible to complete the total project Architec~ Gordon Cheney anticipates that plans and specifications will be ready for a tender call by July 25th. B-276 - 3 - EXPENDITURE AND REVENUE STATEMENT APRIL 1 TO JUNE 30, 1983 EXPENDITURE HISTORICAL YEAR % OF FORECAST SITES PROJECT TO DATE BUDGET TO (DEVELOPMENT) EXPEND BUDGET USED DEC. 31/83 75,449 1,995,000 3.8 1,995,000 HISTORICAL SITES PROGRA.MS YEAR % OF FORECAST (OPERA.TIONS & TO DATE BUDGET TO MAINTENANCE) EXPEND. BUDGET" USED DEC. 31/83 810,043 1,760,322 46.3 1,760,322 REVENUE 1983 RECEIVED % OF INCOME PROGRA.M BUDGET JUNE 30/83 RECEIVED 1,487,200 272,591 18 3 FINANCIAL COMMENTS Village attendance to the end of June was 81,869, down 19,667 from 1982 Correspondingly, gate revenues are down by $37,639 00; gift shop revenue by $13,703.00; and Village outlets by $10,689.00. The cool, wet weather during most weekends in April and May is largely responsible for the poor attendance and lower revenues in all areas The very hot, humid weather in June did not help to improve attendance. The number of citizens to date in 1983 is 374, compared to 377 at the same time in 1982 The popular Dickson Hill School Program was fully booked throughout the Spring season There currently exists a two year waiting list for participation in this program 1983.08 17 , I , B-2?? STAFF PROGRESS REPORT Property Section During the period April 1, 1983 to June 30, 1983, the Property Section of the Finance and Administration Division completed the acquisition of 28 new properties containing 56.750 acres. The total acreage of lands owned by the Authority, as of June 30, 1983 is 27,867.732 acres. During the period the property Section spent a considerable amount of time in the preparation, negotiation, and processing of shoreline management and erosion control agreements. The Property Section also carried out all of the administration management requirements in connection with Authority- owned lands; i.e. agreements, easements, assessments, taxes, leases, rentals, insurance, etc. The Flood Homes Assistance Project pertaining to lands acquired by the Humber Valley Conservation Authority prior to the institution of The Metropolitan Toronto and Region Conservation Authority, was reviewed and is now entered in our records. With assistance from the C.O.E.D. program, we have undertaken to prepare a complete set of deed plot maps of all Authority-owned properties in all the watersheds in the Authority's jurisdiction, using the new metric f100dline maps. To date, mapping for the Etobicoke Creek, Mimico Creek, Highland Creek, Duffin's Creek and the Rouge River has been completed. A breakdown of the properties and acreages acquired by the Authority to date is as follows ETOBICOKE.CREEK WATERSHED Flood Control and Water Conservation: - 2 expropriations settled during period containing 0.970 acres; - 2 permanent easements - Etobicoke Creek Flood Plain Lands - A1ka Developments Limited property, - P Augustinavicius Property, both located on the north side of Sherway Drive in the City of Mississauga. - 1 property sale during period comprising 1.787 acres; - Snelgrove Dam and Reservoir Lands - sold to the Ministry of Transportation and Communications for road widening purposes (1.787 acres) Total to date--67 properties acquired containing 451.734 acres; Conservation Area: Total to date--lO properties acquired containing 418.866 acres; Total of Watershed 77 properties acquired containing 870.600 acres MIMICO CREEK WATERSHED Flood Control and Water Conservation - 7 properties settled during period containing 6.738 acres; - 2 purchases - 5 permanent easements B-278 - 2 - - Mimico Creek Flood Plain Lands - Ministry of Government Services Property, located south of Stee1es Avenue, west of Goreway Drive, City of Brampton. - H. & L. Bowman property, located on the east side of Royal York Road, south of G1enroy Avenue, City of Etobicoke. (1 purchase; 1 permanent easement) - W. & E. Wallace Property, - E. & D. Gi1lelan Property, - s. & V Peel pr8perty, - s. & M. Janiszewski Property, all located at the rear of Royal York Road and Humberva1e Boulevard, City of Etobicoke. (Permanent easements) Total to date--47 properties acquired containing 91.366 acres; - 2 expropriations outstanding (permanent easements) Total Watershed: 47 properties acquired containing 91.366 acres. HUMBER RIVER WATERSHED Flood Control and Water Conservation: - 10 properties settled during period containing 13.314 acres; - 6 purchases - 4 permanent easements - Humber River Flood Plain Lands - - Regional Municipality of Peel Property, located on the north side of King Street East, east of John Street, Bolton, Town of Ca1edon. - 419540 Ontario Limited Property, located on the east side of Clarence Street, Woodbridge, Town of Vaughan. - D. & E. Underhill property, located on the north side of King Street East, Bolton, Town of Ca1edon. (1 purchase; 1 permanent easement) - G. & H. Fox Property, located at 40 John Street, Bolton, Town of Caledon. (1 purchase; 1 permanent easement) - C.M. Murphy Property, located at 30 John Street, Bolton, Town of Caledon. (1 purchase; 1 permanent easement) - P. & C. Terhart property, located at 176 King Street East, Bolton, Town of Ca1edon (1 purchase; 1 permanent easement) - Flood Homes Assistance Project - 2 properties added during period containing 30.023 acres; - 2 purchases - Township of Vaughan property, - village of WOOdbridge property, both located in the Clarence Street area, Woodbridge, Town of Vaughan. - 2 property sales deducted during period comprising 2.922 acres; - sold to the County of York (Toronto & York Roads Commission) for the relocation of Is1ington Avenue. (0.734 acres) - sold to the Town of Vaughan for the extension of Willis Road (2.188 acres) B-279 - 3 - - Woodbridge Channelization - 1 property sale deducted during period comprising 6.966 acres - sold to the County of York (Toronto and York Roads Commission) for the relocation of Islington Avenue (6.966 acres) Total to date--792 properties acquired containing 8,581.680 acres; Conservation Areas: Total to date--79 properties acquired containing 4,305.773 acres; Forest and Wildlife Areas: Total to date--10 properties acquired containing 786.486 acres; Agreement Forest Lands: Total to date--23 properties acquired containing 1,865.745 acres; Niagara Escarpment Lands: Total to date--4 properties acquired containing 251.926 acres; Total of Watershed: 908 properties acquired containing 15,791.610 acres. DON RIVER WATERSHED Flood Control and Water Conservation: - 2 properties settled during period containing 0.222 acres; - 2 purchases - Don River Flood Plain Lands - Gonte Construction Limited Property, located east of Dufferin Street, north of Stee1es Avenue, Town of Vaughan. - City of North York Property, located west of Denver Crescent, in the Sheppard Avenue/Leslie Street area, City of North York. Total to date--190 properties acquired containing 1,955.034 acres. - 4 expropriations outstanding Conservation Area: Total to date--1 property acquired containing 9.350 acres; Total of Watershed 191 properties acquired containing 1,964.384 acres. HIGHLAND CREEK WATERSHED Flood Control and Water Conservation Total to date--143 properties acquired containing 823.911 acres; Conservation Area Total to date--2 properties acquired containing 118.626 acres; , Total of Watershed: 145 properties acquired containing 942.537 acres. B-280 - 4 - ROUGE RIVER WATERSHED Flood Control and Water Conservation - 3 properties settled during period containing 1.497 acres; - 3 purchases - Rouge River Flood Plain Lands - Town of Pickering Property, located west of A1tona Road, north of Highway 12, Town of pickering. - T. & M. Sweeny Property, located on the west side of Rougemont Drive, south of Highway 1401, in the Lower Rouge area, Town of Pickering. - D. & H. Walters Property, located on the east side of Rouge Hills Drive, in the Lower Rouge area, Town of Pickering. Total to date--122 properties acquired containing 2,109.339 acres; Conservation Area Total to date--2 properties acquired containing 267.038 acres; Total of Watershed: 124 properties acquired containing 2,376.377 acres. DUFFIN'S CREEK WATERSHED Flood Control and Water Conservation: - 2 property sales during period containing 9.485 acres; - Duffin's Creek Flood Plain Lands - sold to the Ministry of the Environment in a land exchange. (9.466 acres) - sold to the Town of pickering for road widening purposes (0.019 acres) Total to date--90 properties acquired containing 905.667 acres; Conservation Area Total to date--19 properties acquired containing 1,076.568 acres; Forest and Wildlife Area: Total to date--16 properties acquired containing 1,749.696 acres; Agreement Forest Lands Total to date--1 property acquired containing 93.000 acres; Total of Watershed 126 properties acquired containing 3,824 931 acres. PETTICOAT CREEK WATERSHED Flood Control and Water Conservation Total to date--l property acquired containing 22.139 acres; B-281 - 5 - Conservation Area: Total to date--1 property acquired containing 177 918 acres; Total of Watershed: 2 properties acquired containing 200.057 acres. LAKE ONTARIO WATERFRONT Waterfront Plan: - 4 properties settled during period containing 4.956 acres; - 4 purchases; - Pickering/Ajax Sector - Ministry of the Environment Property, located in the Squires Beach area in the Town of Pickering. - Scarborough Sector - M. & M. Freedman Property, - J. & V. Womers1ey Property, - A. & B. Burnese Property, located south of Crescentwood Road, east of Warden Avenue, City of Scarborough. Total to date--279 properties acquired containing 1,756.440 acres Conservation Area Total to date--9 properties acquired containing 49.430 acres; Total of Lake Ontario Waterfront 288 properties acquired containing 1,805.870 acres. SUMMARY FLOOD CONTROL AND WATER CONSERVATION April 1 - June 30, 1983 - 24 properties settled containing 51.794 acres; (- 15 purchases; - 9 permanent easements - 2 expropriations settled during period) - 6 property sales Total to date--1,452 properties acquired containiing 14,940.870 acres; - 6 expropriations outstanding CONSERVATION AREAS April 1 - June 30, 1983 Total to date--123 properties acquired containing 6,423.569 acres. , B-282 - 6 - FOREST AND WILDLIFE AREAS April 1 - June 30, 1983 Total to date--26 properties acquired containing 2,536.182 acres. AGREEMENT FOREST LANDS April 1 - June 30, 1983 Total to date--24 properties acquired containing 1,958.745 acres. NIAGARA ESCARPMENT LANDS April 1 - June 30, 1983 Total to date--4 properties acquired containing 251.926 acres. WATERFRONT PLAN April 1 - June 30, 1983 - 4 properties settled containing 4.956 acres; (- 4 purchases) Total to date--279 properties acquired containing 1,756 440 acres. GRAND TOTAL OF ALL PROJECTS April 1 - June 30, 1983 - 28 properties settled containing 56.750 acres; (~ 19 purchases; - 9 permanent easements; - 2 expropriations settled during period) - 6 property sales Total to date--1,908 properties acquired containing 27,867.732 acres; (11,278.071 hectares) - 6 expropriations outstanding 1983.08.19 DO em B-283 TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M T R.C A - Mtg 014/83 FROM MR J C. MATHER, ADMINISTRATOR - WATER RESOURCE DIVISION RE WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1983 TO JUNE 30, 1983 The attached progress report is presented for the period April 1, 1983 to June 30, 1983 The report details both the physical and financial progress of the various programs and projects in the Flood Control and the Waterfront Sections Also included is a status report on the Fill Violations as prepared by the Development Control Section Attachments 1983 08 19 JCMlfs . .., n (Xl H N ~ I 10 OPERATING STATEMENT PAGE 2 BY PROGRAM PERIOD ENDING 830703 REP 109 E X PEN D I T U RES REV E N U E __=~_=~_c__=~=_c__=~___=__c=_c_=___==_=~=__=___~==__= _CU_=C=_==_==C_=C======~Q=~==D=_m=mc~c= M-T-D Y-T-D j(, FUNDS M-T-D Y-T-D j(, BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD Ii -=--== =====- -===== :::== __:::z:::r::::=_C1== =~Cl::t== =-:::1::-=- ==m:a== ===m ~ WATER RESOURCE - FLOOD CONTROL ================~=====~======= ADMINISTRATION-FLOOD CONTROL 743.652 89,603 413,537 55 6 330,115 743,652 2,932- 8,315- 1 1 METRO - EROSION CONTROL 396.500 9,927 106,141 26 8 290.359 396,500 27,900- 7.0 YORK - EROSION CONTROL 23.500 10,121 43 1 13.379 23,500 1,400- 6 0 ---- PEEL - EROSION CONTROL 35.600 0 35,600 35,600 0 DURHAM - EROSION CONTROL 5.000 0 5,000 5.000 0 H PLANNING AND REMEDIAL MEASURE 1,343,500 12,047 271,707 20 2 1.071,793 1. 343. 500 0 II OP & MAIN -------- ---- -RIVER FORECASTING, 119,637 8,479 53.446 44 7 66.191 119,637 0 SMALL DANS, CHAN. & ER CONT 244.000 47.463 132,364 54 3 111,636 244,000 0 ----------------------------------------------------- --------------------------------------- TOTAL 2,911,389 167,519 987,316 33. 9 1.924,073 .R>~t,_~83 ___ _ 2.'_'r3::L-__3Z,_615-__J 3 -- - - ---- ----------------------------------------------------- ------------------------~-------------- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL ,I r ------ - -- _.- --- --- - -*-- --- ----- - ----------- - -- - - +---- - - H h - --- - ----------- - --- - -- - -- - --- -- -------- )- OPERATING STATEMENT PAGE 3 0 BY PROGRAM PERIOD ENDING 830703 REP 109 ( 'II ~ E X PEN D I T U RES REV E N U E ( ==~==-==-==-==-=-=----===-=--=-=--==--=--=--=--==---- -====-==--======-================-==-== M-T-D Y-T-D Yo FUNDS M-T-D Y-T-D 7- BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD - = .c=-:c-- =--= - =:c= =-====:::: = ====== ====== =::::z:r=== ==== WATER RESOURCE - WATERFRONT { =====================c===== ADMINISTRATION WATERFRONT 211,239 20,331 95,046 45 0 116,193 211,239 351- 351- 2 ( CAPITAL DEVELOPMENT 1, 531, 261 245,779 483.297 31 6 1, 047, 964 1, 531, 261 3,950- 4,400- 3 , I \ X SHORELINE MANAGEMENT 582,500 59 2,343 4 580,157 582, 500 0 \ ANCE 0 0 ----------------------------------------------------- --------------------------------------- IUIAL. c.,;J.,!;',vuu "!OO,lFV 580,686 .,!;, u 1,744.314 2.325,000 4.301- 4,751- 2 ----------------------------------------------------- --------------------------------------- -- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL - - I rl ------- - - - +--- -- - -.- --- ------ - - -- - -- , , , -~--- -- -. ---- - ----- ._- -- .---------- I \' ~ --- ----- -------- - ----- ( ---- -----~ , I i j It) CD N I lJl B-286 -2- FLOOD CONTROL Erosion Control - Metro Major remedial works have been completed at the Wynford Heights Crescent site in the City of North York Private revenues, in the amount of $27,900 00 which were received this year but not included in the budget figure are reflected in the overall expenditure for this activity. Major work at Beaucourt Road is in progress Major work at Delroy Drive on the Mimico Creek is scheduled for later this year Erosion Control Peel Remedial work at Albert Street in Bolton is scheduled for later this year Erosion Control - York Remedial works at Kirby Side Road have been completed Private revenues in the amount of $1,400 00 which were received this year but not included in the budget figure are reflected in the overall expenditures for this activity MAINTENANCE Major maintenance in Lower Humber Channels is in progress The rehabilitation of.the Pa1grave Dam is scheduled to commence in August of 1983 Regular maintenance of our water control structures has been carried out within the established budget guidelines. PLANNING AND REMEDIAL MEASURES Remedial Works Channel improvement works have been in progress on the Main Branch of the Humber River in Bolton Final grading, cleanup and restoration has recently been completed The contract for Phase II of the Bolton project was tendered and awarded to Sonterlan Construction Corporation Work is now in progress Keating Channel Study The Keating Channel Environmental Assessment report has been - formally submitted to the Ministry of the Environment for their review. Environmental Planning Environmental Inventory reports for the erosion control program were drafted A literature review and mapping exercise of aquifers and groundwater systems in Uxbridge area was completed A start on the collection of background data for input into master drainage planning has been initiated Master drainage planning will be a major activity throughout 1983 B-287 - 3 - ~~~~g~~ Co1'one1 Samuel smith waterfront Area - The entrance road paving contract ha~ fieen completed - The revenue collection control equipment i~ operational - Landfi11ing commenced on June 1, 1983 but progress is behind schedule due to limited amount of local construction. - The number of names on the waiting list for moorings now totals 125. - The City of Etobicoke, Humber College and the Ministry of Government Services are all involved in a planning review of the future of the Lakeshore Psychiatric Hospital - Detail planning of the final park layout is continuing in conjunction with Metro Parks Department and Humber College Humber Bay West - The contract for paving the expanded boat launching parking lot has been completed. - Landscaping around the new launching facility is substantially complete - The Boating Clubs have all carried out additional landscaping and are proceeding with plans for Club House construction - The Mimico Cruising Club has awarded a contract for construction of a day sailing facility and a service dock. - Plans for expansion of the total mooring capacity from 500 boats to 700 boats are under review with the City of Etobicoke - It has been decided to delay the Official Opening of Humber Bay West Phase II until the Spring of 1984 Aquatic Park - The Ministry of Natural Resources has leased the endikement area to The Toronto Harbour Commissioners for completion of the 1andfi11ing and placement of final armouring - The legal survey of the limits of the proposed land transactions between the Province of Ontario, MTRCA and the Toronto Harbour Commissioners is underway The City of Toronto and the Toronto Harbour Commissioners have reached agreement on a recreational corridor along the north shore of the Outer Harbour which has cleared the way for the City of Toronto to support the transfer of the Provincial Crown Water10t in the Outer Harbour to the Toronto Harbour Commissioners - The Authority's Aquatic Park Planning Task Force has met on 2 occasions to establish the Terms of Reference for the planning exercise and to clarify the position of the various agencies represented with respect to future uses of Aquatic Park and the adjoining land areas Ashbridge's Bay - The first phase of maintenance dredging of the channel leading to the public launching ramps was completed, however a l~rger dredging effort will be required in 1984 to restore the channel to a safer condition . B-288 - 4 - B1uffer~ Top~ands - The demolition of the former fi1t~ation plant on Fishleigh Drive has been completed and ~ite restoration t~ well underway-. Final plans for improvements to the existing parking area as well as plans for tree and shrub plantings are being finalized for implementation in the Fall - Plans are being reviewed for the proposed development of the former Seminary lands in an effort to address some of the concerns of local resident~ Bluffers Park - A contract has been called for paving of the roadway to the easterly end of the site and the public parking lot adjacent to the swimming beach - The Spring planting on the easterly parts of Phase II have been completed and plans are available for the Fall planting which should substantially complete the landscaping of Phase II - All 4 Boat Clubs have completed major improvements to their site, particularly related to parking and boat storage areas and landscaping In addition, the construction of the Club House building for the Bluffers Park Yacht Club is well advanced - The Master Plan Amendment which proposes a marina facility to the west side of the boat basin has been approved by the City of Scarborough and Terms of Reference for the proposal call are being prepared - Erosion control work in the Sunnypoint Ravine and along the base of the bluffs adjacent to Phase II is proceeding well East Point Park - Detail planning of the road a1ignme~t and parking lot locations as well as the stream and pond system is under review. In addition, the details of electrical supply and sanitary sewers are being planned. It is anticipated that some construction on the roadway and parking lot will proceed in the Fall. - The City of Scarborough is reviewing its plans for a playing field complex at the westerly end of the park Initial construction of the playing fields is tentatively planned for the Spring of 1984 Ajax Waterfront - The first phase of planting along the waterfront west of Harwood Avenue as well as in Pickering Beach has been completed - Site plans for the Rotary Park area and the lands between Finley Avenue and Rotary Park have been completed. The Town of Ajax has negotiated an agreement with Wimpey Canada Limited to implement significant portions of the park development-along the waterfront adjacent to Wimpey's Neighbourhood 7 Shoreline Management - Property negotiations are continuing in preparation for shoreline protection along Springbank Avenue and Lakehurst Crescent. - A severe erosion problem has developed along Fallingbrook Drive along the westerly end of the bluff and plans are being formulated for protection measures - Detail design of erosion control measures for the South Marine Drive area is continuing in preparation for construction in the Fall. In anticipation of this work, access road improvements are underway along the frontage of the Guild Inn B-289 - 5 - Shoreline Ma'naqement lCont'dl - A. Project for E~osion Control in Bellamy Ravine was adopted by the Authority and Metropolitan Toronto Funding arrangements are now under consideration oy the City- of Etooicoke and the Ministry of Natural Resources Environment~l MOnitoring - The results of the 1982 waterfront monitoring program are being compiled in report form. - The automatic temperature recorders monitoring the lake trout shoals at Bluffers Park were retrieved. Hatching success of the over-wintering eggs was 0 to 5%, similar to last year - The 1983 program is underway with Proctor and Redfern Limited completing sample analyses - The 1983 field program at Colonel Samuel Smith Waterfront Area is underway following discussions with the Ministry of the Environment on sample procedures and fill quality monitoring /md . 'IO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE cnlMITl'EE, M. T . R.C .A. I - i 14/8 3 FRG1: JOHN W. MALEl'ICH, ~, DEVElDPMEN1' CDmlOL SECl'IOO RE: AI:MINISTR1\TION OF CNrARIO REXiUIATlOO pO - APRIL, MAY AND JUNE, 1983. DETAILS OF VIOLATION NOTICE Em'. OFE ACTION TAKEN LOCATION INITIALS TGm of Pickering V-489, Mr. William M. Gerrits Il'l -Ieso1ved as per>IIpemri.t 00. A-945. IDt 6, Plan 469 April 5, 1983 #1972 Southview Drive 3(a) Duffin Creek Watershai TGm of Caledon V-490, Mr. William B. Shields AW -All activity has stowed. lots 27 am 28, Concession 1E April 5, 1983' -Site restoration is under review by 113206 King Road 3(c) Authority staff. (Victoria) llurrber River Watershai I Borough of Etd:>icoke V-491, Raynond & Joan Doucet IM -Fill- has been renoved am the C7'I Part lots 9 am 10, Plan 3347 April 6, 1983 area restored. I Rear of 1141 Riverview Heights 3 (b) HlIIlber River Watershed City of BranptDn V-492, Giuseppe Gi.anoone AW -Resolved by the renoval of the Part lot 11, Concession 7, EH5 April 14, 1983 watercourse cbstructioo. llurrber River Watershai 3(c) TGm of Markham V-493, Mr. Sydney lbpkinson Il'l -Ieso1ved by pezmi.t 00. 8-032. Part IDt 9, Concession 6 May 17, 1983 118041 Kennedy Road 3 (b) lbuge River Watershed FL. 1983 06.30 lJl I IV \D 0 - - '1'0: THE CHAIRMI\N AND MEMBERS OF THE EXEXJJl'IVE CCtolMITl'EE, M.T.R.C.A., - i 14/83 tIl I N FOCM: JOHN W MALEl'ICH, MAN1\GER, DEVEIill'MENl' <XNl'RDL SEX:TIOO. \D t-' RE AIMINISTRATIOO OF ClN'I1JUO REX>UIATIOO 170 - APRIL, MAY AND JUNE, 1983 ENF. OPE A.CTION TAKEN LOCATION DETAILS OF VIOLATION NOTICE INITIALS , - TcMn of Caledon V-494, Joffrey H. Bellcharrber AW -All activity has stopped. Part lot 9, Concession 6 Hay 20, 1983 -Site status is under review by #91 Sackvi11e Street 3(a) Authority staff. (Bolton) Hunber River WatershErl TcMn of Richnond Hill V-495, Alberino 'l\::.tnasone AW -All activity has stopped. Part lot 66, Plan 2027 June 2, 1983 -Mr Tanasone is preparing a proposal for # 52 walner Road 3 (b) review by staff within the penni.t process. [bn River WatershErl I TcMn of Vaughan V-496, Peter & Fi1arena I.am.1to I:M -Fill has been renoved and the -..J lot 7, Concession 5 June 14, 1983 area restored. I #7710 Islington Ave., 3(b) Hunber River Watershed Borough of ScamoroUJh V-497, Albert & Linda Sausik rn -Je301ved by penni.t !D. &-065. Lot 66, Plan 284 June 27, 1983 #309 West Point Avenue 3(b) !buge River Watershed Borough of ScaJ:borough V-498, Jerry & Bruna Reyn rn -Resolved by penni.t !D. &-065. Lot 65, Plan 284 June 27, 1983 #313 West Point Avenue 3(b) !buge River Watershed V-499, D. Ptrllister Trucking . June 27, 1983 3(b) I. L. 1983.06.30 -- '10: THE CHAIRMtIN 1\ND MEMBERS OF THE EXEXl1I'IVE CXMITTI'EE, M.T.R.C.A., - i 14/83 FKM: JOHN W WILEl'ICH,~, DE.VEI.Ol'MENl' CCNrnOL SOCTICN RE: AI:MJlUSTRATION OF 0N'I2\lU0 REGUIATICN 170 - APRIL, MAY AND JUNE, 1983. LOCATION DETAILS OF VIOLA.TION NOTICE ENE' . _ OF.F: ACTION T1U<EN INITIALS V-SOO NEVER PRINI'ED. V-SOl, J~ R:tlitaille 00 -Restoration lIIldezway. Tam of Markham June 28, 1983 pt. IDt 3, Cbn. 7 3(c) west side of Hwy. 148 V-502, Dagmar COnstruction Ltd. R:>uge River Watershed June 28, 1983 3(cl I Borough of East York Mr. Art Kovari [M -Fill renDVed in acoordance (Xl 160 [))n Valley Drive with court Order. I D:>n River Watershed City of Mississauga V-481, Joserh Kaufman Nil -convicted Provincial Offences COurt am fill pt. IDt 1, Cbn. 1, sns Enterprises Ltd. ('!be Kitd1en ordered renoved May 20, 1983. 2050 Dundas Street centre) -Site has been restored as per the court Etobiooke Creek Watershed December 1, 1982 Order am to the satisfaction of the 3 (b) \ Authority staff. City of Mississauga Pacific Paving of Markham Ltd. Nil -cDnvicted Provincial Offences COurt am pt. IDt 5, Cbn. 4 EllS &Mr Philip Polioelli (President) fill ordered reroved Haren 7, 1983. 5845 4th Line East ~ 9" 1982 -Fill renDVed in acoordance with COurt Order. Etobiooke Creek Watershed 3 (b)l /'1.# 1983.06.30 III I . N \D N B-293 TO: The Chairman and Members of the Executive Committee, M.T R.C.A., Meeting #14/83 - Wednesday, August 31, 1983 FROM T. E. Barber, Administrator, Information and Education Division RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT April ~ - June 30, 1983 CONSERVATION INFORMATION SECTION The Conservation Information Section carries out the Authority's general information program, as well as programs relating to the resource management activities and the marketing of the Authority's revenue generating facilities - Black Creek Pioneer Village, the Kortright Centre for Conservation and the Conservation Areas, in addition to the marketing enhancement program funded by the Canada/Ontario Employment Development Program. COMMUNITY RELATIONS - INFORMATION - GENERAL Printing Highlights - the 1983 Directory was printed and distributed - printing and distribution of the Authority's 1983 Calendar of Events and Activities (Summer and Fall) have taken place (25,000 copies) - news and photo releases were printed and distributed, regarding the Canada/Ontario Employment Development Program, the Boyd Archaeological Field SchoOl, the Residential Summer Course, Notice of Public Meeting at Kortright, Reforestation Services and the Foundation's Election of Officers - production and distribution of "Highlights" for the period January 1 to April 30, 1983. Tours and Special Days - staff organized and carried out arrangements for a) the Authority's Annual Sugaring Off Party, for members and staff, held at the Kortright Centre for Conservation on Saturday, April 9, 1983 b) Sod Turning for the Etobicoke Board of Education Dormitory at the Albion Hills Conservation Field Centre on Monday, May 9, 1983 c) Tenth Annual Honour Roll Awards Presentation on Friday, May 13, 1983 d) tour for Scarborough Council Members and Senior Staff on June 23, 1983 e) tour for the Flood Control and Water Conservation Advisory Board on June 28, 1983 f) the Annual Garden Party on Wednesday, June 29, 1983. Special Programs: - considerable staff time was required for interviewing candidates and for the subsequent selection of the Village Promotions Officer - staff spent extensive time working with the Foundation on their special fund-raising campaign for the Visitors Centre - distributed 2,000 General Brochures to residents of Mono and Adjala, through special mail-outs. Audio-Visual Highlights - staff wrote and prepared a major slide show, which was presented by Kortright Centre staff to the Board of Directors of the Canadian National Sportsmen's Shows on Friday, June 24, 1983 B-294 - 2 - COMMUNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT Printing Highlights: - distribution is underway of the revised Valley and Stream Regulations and the Waterfront Regulations, and French translations are available. They have been delivered to municipal offices and consultants, and have also been distributed at the mall promotions. Audio-Visual Highlights: _ staff set up a resource management exhibit at the Scarborough Town Centre, during Environment Week in June. COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING Printing Highlights: - mass distribution is underway of the Black Creek pioneer Village Brochure, Conservation Area Map, Calendar of Events, General Brochure, flyers and posters, and is being carried out by an Experience '83 staff member _ the Black Creek Pioneer Village Walkaround Tabloid was printed in April _ the posters promoting Black Creek, Kortright.and the Conservation Areas have proven to be very popular, as distribution continues throughout the watershed. The Black Creek Pioneer Village poster has now been distributed for display in the Liquor Control Board of Ontario outlets in the region. _ Brochures Unlimited continues to distribute the Black Creek, Kortright and Conservation Area Brochures in the Metro region, and throughout the Niagara Peninsula in the case of the Black Creek and Kortright Brochures - since May, an Authority enclosure has been sent out with the City of North York's water bills. This program will continue every two weeks until the end of August. Adja1a and Mono also participated in this type of program. _ staff prepared and distributed 12 news releases, 2 photo releases, 13 synopses and 17 flyers, identifying and promoting programs at the Village, Kortright and the Conservation Areas _ the Miracle Food Mart grocery bag promotion, for Black Creek Pioneer Village, was completed during this period and 1 1/2 million bags were printed and distributed - the Authority subscribes to the MacLean Hunter Press Clipping Service and, for this period, received approximately 860 press clips, which is only a sample of the coverage the Authority receives. Special Programs: _ staff attends regular meetings of the Attractions Council of the Metropolitan Toronto Convention and Visitors Association _ considerable work and planning went into developing the Visitors Survey, which is underway at all of the Authority's public use facilities _ the telephone answering sales program on evenings, weekends and holidays has proven to be very successful. As a result, this program will continue for the rest of the year. _ Teleguide units have been installed at Black Creek Pioneer Village, the Kortright Centre, Indian Line Tourist Campground and the Head Office - the multilingual television station, Channel 47, began a 13-week promotion on the Authority's recreational facilities during the first week in June - the word processing equipment is now being used to enhance the marketing of our facilities and programs. B-295 - 3 - Audio-Visual Highlights - summer television promotions were sent to all the Southern Ontario television stations, promoting Black Creek, Kortright and the Conservation Areas - arrangements were made and exhibits were set up at - Scarborough Town Centre - Shopper's World (Danforth) - Cloverda1e Mall - Towne & Count rye Square - Bayview Village - Eaton Centre. Advertising and Promotion: - arranged for special publicity features with a) Ontario Crafts Council - Ontario Craft Magazine b) Federation of Ontario Naturalists - Seasons c) Canada Century Home d) Canada's Wonderland - Around Canada's Wonderland e) Region of York - York Region Travel Guide f) Metropolitan Toronto Convention and Visitors Association _ Happenings, Guide Map, Discovery Guide g) Region of Durham - Travel Guide - participated in "New York Sales Blitz", arranged by the Central Ontario Travel Association, June 6 - 8, 1983 (Black Creek Pioneer Village) - participated in "June Familiarization Weekend - Marketplace" at the Westin Hotel, June 24, 1983 (Black Creek and Kortright). Canada/Ontario Employment Development Program: The Authority's Marketing Program has been substantially enhanced with the hiring of one Project Coordinator and five staff members under the Canada/Ontario Employment Development Program. These employees will carry out an extensive Visitors Survey throughout the summer and will also distribute literature and staff exhibits, as well as monitor visitor trends in the autumn, winter and spring. , CONSERVATION EDUCATION SECTION Kortright Centre for Conservation: - attendance for the first six months of 1983 was over 45,000 visitors, right on target for the projected annual attendance of 90,000 - exhibits by prominent wildlife artists and photographers are becoming very popular with visitors; during this period there was a wildlife photographic exhibit by Erica Thimm 'and a wildlife art exhibit by Ralph and Pauline Brunner - amongst a wide variety of programs attractive to all ages and interests were Photo Hikes, Planting for Wildlife, Rain Runoff and Rivers, Wildlife and Art, Moccasin Walk, Wildflowers, Bees, etc. - some of the special events scheduled at Kortright during this time were several wedding receptions, business meetings and lunches, an APEO dinner arranged by the Ministry of Natural Resources, a retirement party for a prominent member of the local community, several Professional Development Day programs for teachers, private banquets, a Boyd Master Plan Open House for the community to see the proposed plans and register both verbal and written comments with Authority staff, etc. - the continued development of several projects, thanks to a variety of government sponsored, labour-intensive, programs and funds raised by the Foundation and by various Ministries 4. B-296 ~ 4 - - participation in the C.O.E D. Program which, to-date, has resulted in the completion of the gatehouse, the construction of the energy house, the completion of the marsh boardwalk, the construction of a staff room, windows and viewing stand at the sawmill; and renovations to the pump house - the Renewable Energy Theme indoor exhibit component is complete, as per approved plan; and the outdoor energy trail concept and plan has been approved for development - to begin immediately and progress in several phases - implementation of the plan by Landplan Collaborative Ltd. for the central core area (including the construction of additional eating facilities) will begin in the fall of this year Day Programs - during this academic year both the content and quality of Cold Creek Conservation Field Centre education programs have been upgraded to an exceptionally high level; several new programs for intermediate and senior level students are being prepared for the fall/winter season, with a resource management component as a part of each program; details for a senior level rifle range program have been finalized between the Co~servation Land Management and Information & Education Divisions, with the program scheduled for implementation in the fall - at Black Creek Pioneer Village the spring season was extremely busy, with just under 22,000 students from greater Metro area and across the province, and from the border states of the U.S.A. participating in a variety of historical tour programs; as well, the Pioneer Life Program was fully booked with the two largest participant groups being from Scarborough and Metro Separate Boards of Education; Again, York University cooperated in a joint program for senior students entitled "A Trip in Time"; The volunteer component of the education staff continues to provide a vital service to the Village education programs. Residential Programs - the residential centres continue to operate at about 90% occupancy - in addition to the usual groups of elementary and secondary level students and teachers, there have been several senior level student , groups from private schools, two secondary level leadership training programs, a Rotary Club, a Junior Farmer group, several Brownie and Girl Guide groups, and a special Art Group from the North York Board of Education - all staffing requ~r~e~t~ for ~h~ ~983/84 academic year have been filled and include the additional hiring of a Supervisor, three rnstructionaT staff, three residential assistants and one seconded staff - the C 0 E.D Program at Albion Hills Field Centre has provided labour and materials to complete the extensive maintenance program for the exterior of the Centre building, as well as several smaller projects - the C.O.E.D. Program at Lake St. George Field Centre has provided labour and materials to complete the exterior barn renovations, the construction of a boathouse and dock, walkways, landscaping and several smaller projects. Etobicoke Environmental Education Centre - Albion Hills - the Etobicoke Board of Education held a Ground Breaking Ceremony on site, to mark the commencement of the construction of its outdoor education centre; completion is scheduled for early in 1984 - the Advisory Committee, made up of members from both the Etobicoke Board of Education and the A.uthority, has met and selected a Supervisor and teaching staff - the new centre will accommodate about 70 students and accompanying staff, and will be used primarily by Grade 7 students from the Etobicoke Board of Education . . 5. B-297 - 5 - FINANCIAL COMMENTS All expenditures and revenues appear to be on target. The 1983 budget for the Renewable Energy Program at the Kortright Centre for Conservation is $183,492, of which $77,607 has been spent to June 30, 1983 N2 3%) and $105,886 is available to the end of the current agreement between the Authority and the Ministry of Natural Resources (March of 1984) . PH/AH/mrp 1983.08 24 ~ ~ ~_----r.--~ ,,--------..- ---:-- ---..----.--.- ---- . 00 '" N I > l:ll OPERAll~G &lAl~M~NI ----- -- PAOE 5 - 0 BY PROGRAM PERIOD ENDINg 830703 REP 109 I' 8 E I PEN D I T U RES REV E N U E r ~ - --- - -- c~aDm~~=C==Da.a..=.~.c=aa=amca=acama===~2===C==~===Z= K=~=a======amme~maaa.e=a===-~=~==a===== I'I-T-D V-T-D X FUNDS I'I-T-O V-T-O X ( BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD ___a -... IIIJ:lC CRlSa aroma:: _m__.a ccsa.l::Is __.a:::aaa aClClD INFORMATION ~ EDUCATION ( ma=mm~=m=a.mc.c_..._D__ ~DMINlS1RAIJON - I & E 41:),;.3/0 4;J,106 1~~.167 47 0 ~2(J.~---41!, 370 246- - - ---- 240- i ( COMMUNITY RELATIONS - INFORMA 80.127 2,387 16,877 21 1 63,250 80. 121 0 \ I K COMMUNITY RELATIONS - INFORMA 11.000 0 11,000 11, 000 0 ( III RELATIONS - INFORMA 410.24;J a,:)tl6 4il.~5~ 47 6 4h284 90.243 -- - -- - - - - 0 I FIELD CENTRE - OPERATIONS 1.273.083 93,697 ~. 101 39 9 164.982 1. 213. 093 76.'10- 491.086- 38.6 KORTRIQHT 442,000 39,484 219.333 49 6 222.661 442.000 18,'23- 132,021- 29 9* 14,800 ---- --- - -- - -- 0 - ----------------------------------------------------- --------------------------------------- 1 \ I , , , . ----------------------------------------------------- --------------------------------------- ENCUMBERANCE'S ARE NOl INCLvu~u I~ JH~ A~'UAL --- RORTRIGHT - RENEWABLE r ENERGY PROGRA.M 183,493 77 , 607 42 3 105,886 ___ __4__ *Ooes not ~nclude Mun~c~pa~ Levy. Provincial Grant and interest on the Growth Endowment Fund (6 months of the year) 1 \1; ~ . l <.. --- - - - - - -- I ,I B B-299 TO The Chairman and Members of the Executive Committee, M T R C A - Meeting 014/83 FROM P B Flood, Administrator Conservation Land Management Division RE Conservation Land Management Division PROGRESS REPORT PROGRAM ADMINISTRATION The written portion of this report covers events, activities and project accomplishments to August Reporting dates for statistical data are noted Considerable administative staff time continues to be spent in coordinating projects under various special employment projects The largest project, COED ($820,000 and up to 57 employees) commenced in April and progress on projects is well underway CCDP Programs are continuing in York-Peel and Brampton-Georgetown ridings The Ontario Riding project has concluded The Experience '83 program commenced in May and employed 26 students on various projects through August Under the Provincial Works Sector Program, the Fisheries Enhancement and Parks Sector projects concluded in May The Forestry Stimulation project continues and a new project - Conservation Area Improvement _ is just underway WATERSHED RECREATION - PLANNING On June 28, the Authority held a second public open house for the Boyd Master Planning Study The purpose of this meeting was to provide the public, interest groups and government agencies with an opportunity to review and comment on the five alternative concept plans prepared for the Area Approximately 50 people attended the open house The many comments received were tabulated and sUbsequently included in the analysis of the concept plans For comparative purposes, each plan was also evaluated according to how well it met the Authority's goals and objectives for the Area, its potential impact on the environment and its overall economic viability The study team is currently working on the development of a preferred plan for the area This plan will be presented to the pub1ic'at the third and final open house at the Kortright Centre on September 15. In addition to the Boyd Master Plan, staff, with the assistance of the COED program, are preparing Master Plans for the remaining Conservation and Forest and Wildlife Areas To date, work has concentrated on Albion Hills and C1airevi11e Conservation Areas A graphics designer hired under the recently approved Parks Sector Work Program will enable trre Authority to prepare much needed area directional maps The first of nine of these maps has been completed for C1airevi1le. WATERSHED RECREATION - DEVELOPMENT All necessary approvals required for the development of a Supervisor's residence/control building at Indian Line Campground and a washroom and picnic shelter complex at Albion Hills were finally received in August Construction of these facilities is to begin immediately A number of smaller development projects were completed with labour and materials provided by the COED program. These projects included an equestrian centre at Clairevi1le, curbing and paving of the turning circle at Indian Line and repairs to the Greenwood and C1aireville refreshment booths Work on an extension to the trap range building at Cold Creek and restoration of the grist mill at Bruce's Mill is ongoing PROGRESS REPORT B-300 PAGE 2 The COED program has also provided the Authority with an opportunity to update and standardize Conservation Area signage To date, a detailed inventory of all existing signage has been completed Production of new signs is underway using a recently acquired routing machine The painting of several Authority buildings has also been undertaken using COED labour WATERSHED RECREATION - OPERATIONS During the first quarter of 1983, the usual 6 Conservation and 2 Forest and Wildlife Areas were open for public use Due to the abnormal lack of snow normal winter recreation activities were not possible. The Albion Hills and Bruce's Mill ski programs were able to offer limited facilities on 3 and 2 weekends respectively. Only 5 groups at Albion Hills and 2 groups at Bruce's Mill were able to participate in the instructional program In an effort to reduce costs ski staff were released early. None of the scheduled winter Special Events were held The monthly Retriever Trials commenced in March at both C1aireville and Cold Creek. The Bruce's Mill Maple Syrup Demonstration began the first weekend of March, a week earlier than usual Attendance for organized school tours was 4281, a decrease of 502 over last year General public attendance was 14,249, an increase of 507 over 1982 During January, the annual delivery of 45,000 Rainbow Trout fry was received at the Glen Haffy hatchery. This fish will provide the "Put and Take" stocking supply for the Glen Haffy ponds, Heart Lake and other Areas in 1984. In July, a successful "Fish Derby" was held with 8 lucky anglers catching tagged fish and winning pr~zes donated by Molson's and Ruko Canada The lack of winter recreation activity permitted-Area staff to carry out more than the usual amount of routine maintenance and repairs to buildings, grounds and facilities. This work was augmented by 2 Special Employment programs At Bruce's Mill, 2 young workers were employed under the Winter Experience Program to assist with maintenance and program preparations At C1airevi1le, Heart Lake and Boyd Areas, 2 3-man crews started work under the 1983 Canada Commun~ty Development Program (CCDP) These workers assisted with building and picnic table cleaning and painting and also accomplished considerable landscape tree pruning in picnic areas This program continued throughout the summer and expanded to all Areas Under the Authority's COED program, 10 workers have bee~ hired to assist Conservation Area staff with regular operations and maintenance These additional workers have assisted in upgrading maintenance standards to levels In previous years A crew of 3 workers is at Indian Line Campground carrying out new planting and maintaining all p1antings They also assist in all ground maintenance work at the campground The Experience '83 program has provided 2 crews of three students to work on Area nature trails At C1airevi11e and Heart Lake, pruning and surfacing has been completed along with preliminary assessment of the Albion Hills trail The eastern crew has completed pruning and surface improvements to trails at Bruce's Mill, Greenwood and Petticoat Creek. An additional 13 students have been employed as gate and boat concession attendants At Cold Creek, 69 people attended the four Hunter Education Courses conducted by the Area Superintendent. In response to demand, section staff, in consultation with I&E Division staff, have revamped the Shooting Skills Program for school groups and this program is being offered to grades 7 and up in September. During the winter, Sporting Clubs have used the ranges for 2 "Ham Shoot" competitions The Upper Canada Rifle Association has held a monthly event during April - June In June, the National Golden Retriever Trials were held at Cold Creek The Radio Controlled Flying Club of Toronto hosted it's annual Fly-In in early August All Areas were in operation for summer activities by early May' with the 7 swimming areas opening as scheduled the first weekend of June During July and early August, high bacteria counts resulted in the closing of Boyd, C1airevi11e and Bruce's Mill swimming areas Bad algae growth at Heart Lake has also forced periodic closing of that swimming area At Heart Lake, a public boating program was established opening the lake to private non-motorized water craft The weekend ORCA canoe instruction programs at Claireville have again been well received with 58 participants attending the 8 courses B-301 PROGRESS REPORT PAGE 3 In an effort to reducing operating costs, the group (school) instructional program was dropped However, equipment has been rented to 3 groups to run their own program The C1airevil1e water ski site has been used for 4 tournaments including the Ontario Championships At Albiorr Hills, the Rambling Hills Riding Club has held their monthly horse show The new public riding program at Clairevi11e began operation in June. To date, user comments have been very favourable and attendance is growing During the winter, Petticoat Creek staff again carried out the annual inventory of all Authority vehicles and equipment and the annual inventory for the Land Management Division of all Area tools, equipment and furnishings Division staff have devoted considerable time to preparation and processing of Tenders for the Authority's acquisition of replacement vehicles, tractors and equipment. All items ordered including 5 r~p1acement trucks and 4 tractors, have been received. Through the winter, Division staff organized a training seminar on Chainsaw maintenance and safe "felling" techniques. This program sponsored by the Ontario Pulp and Paper Makers Safety Association was attended by staff from various Authority locations and has been very favourably' received by all attending. It is a valuable addition to the Authority safety program A tractor maintenance seminar sponsored by the Ford Motor Company was held for operating staff involved in tractor operation Two Conservation Area supervisors and the Safety Officer attended the MNR Enforcement Course and successfully passed the test requirements. They will be eligible for future appointment as Provincial Offences Officers to enforce the Authority's Conservation Area Regulations. In early July, all lifeguard staff attended a two day cardio pulmonary resucitation course to improv! the level of lifesaving skills available for emergencies. Division staff have been actively involved in promoting Area recreation facilities by staffing displays at the Camping on Wheels and the Canadian National Sportsmens Shows Emphasis in both displays was on Conservation Area recreation facilities. Revisions have been completed and updated information pamphlets printed for campground operations, boating programs and range operation Copy for the individual Area brochures was revised in preparation for printing The Bruce's Mill and C1airevi11e brochures are available with other Areas to follow shortly Considerable input was provided by Division staff into the preparation of the new wConservation Areas Brochure" This brochure has been well received by Area visitors. The following table shows Area attendance for the period January 3 to July 31, 1983 It shows a decrease of 39,725 people or 5 3~ over the same period in 1982. Spring and summer attendance is up but not sufficiently to overcome the loss of winter attendance. Swimming area closings have hurt summer attendance. ATTENDANCE AT CONSERVATION AREAS, JANUARY TO JULY 31, 1983 1983 1982 ALBION HILLS 84,656 113,552 BOYD 104,625 105,498 BRUCE'S MILL 109,012' 118,974 CLAIREVILLE 95,422 103,244 COLD CREEK 20,933 18,760 GREENWOOD 41,05T 46,516 HEART LAKE 74,437 62,991 PALGRAVE' 334 9,509 PETTICOAT CREEK 102,628 77,835 WOODBRIDGE 9,501 8,871 704,823 744,548 PROGRESS REPORT B-302 PAGE 4 CONSERVATION LAND MANAGEMENT PROGRAM Job creation programs funded by the Federal and Provincial Governments have enabled the Authority to accelerate resource management projects on Authority, public and privately owned lanqs within the watershed On Authority owned lands, staff hired under the Canada Community Development Program and the Parks Work Sector Program carried out woodlot and plantation management programs in the following locations Bolton Resource Management Tract (201 cu m 156 cords of firewood), Glen Haffy Forest and Wildlife Area (432 cu m 1120 cords of pulpwood and 1600 meters of fireguard maintenance), Glen Major Resource Management Tract (1500 meters of firegaurd development) The Bruce's Mill Conservation Area produced 45 cu m./12 cords of firewood this past winter Since May, staff on the COED and Forest Stimulation Programs have continued with forest management Four hectares of plantation in the Glen Haffy Forest and Wildlife Area have been thinned. An estimated 400m3 (110 cords) of pulpwood has been produced Under the Fisheries Work Sector Program, which started in the fall of 1982, staff developed and posted 8 km of fishing trails in the Bolton Resource Management Tract and 4 km. in the Claremont Forest and Wildlife Area Six fishing piers were also constructed for the Clairevil1e Conservation Area It is anticipated that the installation of these piers will enhance the fishing opportunities in the reservoir This summer, the Authority took part in the Conservation Services Experience '83 Sub-Program Four hundred meters of cold water fish habitat was improved on one private property located on the Humber River Eroding streambanks were stabilized and artificial bank covers, deflectors and in-stream boulders were installed An 80m eroding bank on a second private property was also stabilized Waterfowl habitat was enhanced by erecting wood duck nesting boxes in the Palgrave Forest and Wildlife Area The Authority has worked in co-operation with Save Our Streams, an organization dedicated to enhancing fisheries habitat To date, they have completed stream improvement projects in trye Claremont and Palgrave Forest and Wildlife Areas Yet to be completed is a similar project in the Glen Haffy Forest and Wildlife Area Reforestation projects have been completed on Authority lands with 50,000 seedlings planted at the Glen Major Resource Management Tract, 6,000 at the Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and Wildlife Area Boy Scout groups have planted 10,000 seedlings at the Bolton Resource Management Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd Conservation Area, and 10,000 at the Glen Major Resource Management Tract As part of the Resource Management Tract program, fireguards have been maintained in the Glen Major, Goodwood, Glen Haffy and Palgrave Areas Eight hundred meters of fencing have been constructed in the Bolton Resource Management Tract to control unauthorized motor vehicle access Planning projects for resource management programs on Authority owned lands are also underway Regular Authority staff and those on the Forest Stimulation and COED Programs have prepared forest management plans for the Albion Hills Conservation Area, Palgrave Forest and Wildlife Area, Glen Major, Nashville and Bolton Resource Management Tracts Forest management plans for the Cold Creek Conservation Area and Goodwood Resource Management Tract are presently being finalized An Authority land reforestation inventory has been prepared which summarizes all plantings on MTRCA property from 1957 to present Staff are continuing to inventory and assess watercourses on Authority property A stream improvement management plan on a watershed basis will be developed and Experience '83 Programs have provided the staff for this project Resource management plan preparation will continue throughout 1983 for Resource Management Tracts, Forest and Wildlife Areas and Conservation Areas Agricultural rental reviews have been carried out on ten Authority lands to date in 1983 B-303 PROGRESS REPORT PAGE 5 The Authority's 1983-84 Parks and Work Sector Program has now been approved Fencing projects will be undertaken in the Bolton, Snelgrove and Nashville Resource Management Tracts as well as the C1aireville Conservation Area It is anticipated that 2600m of fence will be constructed Forest Management work will also continue as part of this program Sites include Palgrave Forest and Wildlife Area and Glen Major Resource Management Tract. Approximately 47,525 reforestation trees wer~ planted this spring for 20 landolllTlers 12,763 wildlife shrubs and 2,723 trees were planted for 49 landowners this spring under the Tree and Shru~, and urban Wildlife programs. A further 2,945 shrubs and 1,010 trees will be planted this fall for 19 landowners ~ Total p1antings for this year will total 15,708 wildlife shrubs and 3,733 trees One Conservation Plan has been completed with four applications on file To date', 34 Conservation Plans have been completed for private landowners. One application for a reforestation subsidy is on file for 19,500 trees ~ The tree spade was used for 2 private land tree moving projects this spring and 4 are on file for this fall. Under Private Lands Assistance Programs, 88 site visits have been carried out to date to provide technical advice on tree planting programs, pond advice, and urban wildlife. Planting activities for private lands programs include continuing inventory of past assistance programs, a land use review of major watershed to priorize project locations throughout the watershed and a continued agricultural land use review Staff have currently been working on programs for ESA management on Authority, private and public lands. To assist in this project, both a priority and preservation list of ESAs have been prepared This priority list was based on research of existing information and communication with other staff and agencies and categorized ESAs on their need for management due to present and potential impacts Presently, 23 ESAs hav~ been field inventoried for impacts and a management strategy for each has been prepared indicating recommendations for the management of these ESAs These management strategies will be incorporated into resource management plans where required; will aid in identifying priority areas for the private landowner assistance programs; and will be utilized during discussions with public agencies Promotion for Services Programs has included to date the circulation to cable T V outlets a video tape of the Conservation Services slide presentation and news releases for various assistance programs A slid~ presentation on the Density Bonus Program will be completed in the near future Inventories have been completed for 90$ of the primary and secondary watercourses within Metro Toronto and surrounding municipalities for the Authority's Urban Management program Three planting projects have been completed for the Rouge and Don Rivers and Highland Creek Two hundred and ninety-five trees and 1,300 wildlife shrubs have been planted In addition, approximately 200 meters of valley slope has been graded and hydro-seeded at the Etobicoke General Hospital along the Humber River Plantings have also been carried out for the City of Brampton with 4,450 seedlings, 100 trees and 890 shrubs being established. Six additional. si,tes ar~ scheduled for the fall under the COED program. Approval in principal has been reached with the City of Brampton for a joint project to b~ conducted in the spring of 1984 on public lands Landscape projects have been carried out at Humber Bay West, Ajax Waterfront Area and Bluffer's East wacerfront development projects. Tree maintenance projects have also been carried out Projects were also carried out as part of the Bolton channelization project and the South Thackeray Sanitary Landfill Site The Authority nursery program supplied trees and shrubs to various tree planting and landscape projects as well as to the Flood Control Section, MNR, South Lake Simcoe, and Kawartha Lakes Conservtion Authorities and Save Our Streams Under the COED program, staff have assisted in accelerating th~ production of plant material used on job creation projects B-304 PROGRESS REPORT PAGE 6 FINANCIAL STATEMENT YR TO DATE ~ BUDGET EXPENDITURES EXPENDITURES BUDGET USED Administration 365,422 673,204 54.0 Watershed Recreation Planning 16,644 75,000 22 0 . Conservation Area Deve10pmen t 21,296 181,960 12 0 Operations & Maintenance 1,050,153 2,149,000 49.0 Conservation Land Management Planning 63,743 118,500 53.8 Conservation Management 160,692 309 , 181 52 0 Fish Rearing 2,988 10,500 28 5 Operations - Non-Revenue 19,083 31,000 61 6 REC'D. TO ~ BUDGET REVENUES 1982 BUDGET DATE REC'D Operations & Maintenance 1,016,000 330,156 32 5 Conservation Management 1311,000 76,474 24 7 . FINANCIAL COMMENTS PROGRAM ADMINISTRATION Spending levels indicate that the benefits portion will be over budget by approximately $18,000 This is a result of a much greater increase than anticipated for premiums ($14,000) and budget reduction for gapping ($4,000) Reductions in spending in the Central Services, Conservation Services and Conservation Planning programs have been made to cover $14,000 of this projected deficit PLANNING & DEVELOPMENT The Boyd Master Planning Study is on schedule and within budget The Access for Disabled Program was under spent due to weather conditions and actual costs for the Petticoat Creek shower facility which were less than originally budgeted Work on the two major development projects has not begun pending technical approval from Ministry of Natural Resources CONSERVATION AREA OPERATIONS June projected spending to year end indicated expenditures would be under budget The amount however was not sufficient to offset the severe impact of lost revenues from the winter period The loss of swimming in key Areas prevented any chance of increased summer revenues to overcome the shortfall Area Superintendents are currently examining their spending projects to reduce costs by approximatelky $46,000 CONSERVATION LAND MANAGEMENT Expenditures for all programs are in line for this time of year Revenue estimates will be met following fall programs ~ B-305 , the metropolitan toronto and region conservation authority minutes REPORT #15/83 EXECUTIVE COMMITTEE 14-SEPTEMBER-1983 #15/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 14 September, 1983. PRESENT FOR THE HEARING Chairman Mrs. F.E Gall Vice-Chairman E V Ko1b Members E. Fulton Mrs L. Hancey H C. Lawrie S.A Macpherson (For W.G. Barber) L. Martin Ms. S Nimmo J S. Scott Following the roll call, the meeting recessed to hold a hearing re Car1ro Holdings Limited City of Mississauga Etobicoke Creek Watershed PRESENT FOR THE MEETING Chairman # Mrs F E. Gell 0 Vice-Chairman E V Kolb Members M W H Biggar E. Fulton Mrs L Hancey H C Lawrie S A Macpherson (For W G Barber) L Martin Ms S Nimmo J S Scott ABSENT Members W G Barber Mrs N Stoner MINUTES Res #237 Moved by J S. Scott Seconded by: S A. Macpherson THAT the Minutes of Meeting #14/83 be approved. CARRIED. SECTION r NO ITEMS SECTION II FOR CONSIDERATION Mr W A McLean, Acting General Manager, informed the meeting that a Flood Plain Criteria Review Committee has been appointed by the Ministry of Natural Resources A public hearing will be held on 3 October, 1983, and written submissions are being requested by October 31 B-306 -2- Mr McLean emphasized the seriousness of this matter, and recommended that the Authority present a brief to the Review Committee Res 238 Moved by L Martin Seconded by H C Lawrie THAT the staff be directed to prepare a brief for presentation to a hearing by the Flood Plain Criteria Review Committee CARRIED 1 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res 239 Moved by Mrs L Hancey Seconded by S.A Macpherson , THAT the applications listed herein as A(ll to I\( 4) inclusive, be approved subject to the conditions contained in the reports CARRIED A(ll Ganymede Investments Ltd To construct temporary diversion ditch and siltation pond, north side Highway #7B, east of Bathurst Street (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Site preparation, top soil stripping, and rough grading plan, Drawing #Al-83740-SK1, as prepared by Proctor & Redfern Limited A (2) The Municipality of Metropolitan Toronto, Parks Department To construct washroom/changeroom building, mouth of Rouge River west side, south of C N R , City of Scarborough (Waterfront) In accordance with the following documents and plans, which shall form part of the permit A site plan, Job #83103, Drawing No One prepared by William Saccoccio, as revised A(3) Harrington & Hoyle Limited (for Dr R Schneider) To rehabilitate and stabilize valley side slope, rear Lot 35, R P M-754 , City of North York (Don River Watershed) In accordance with the following documents and plans which shall form part of the permit (a) Landscape Plan Drawing #1, dated June 22, 1983, as prepared by Harrington & Hoyle Ltd , Landscape Architects (b) Section Plan showing Sections A-A and B-B, as prepared by Harrington & Hoyle Limited A( 4) City of Brampton To alter watercourse south of Steeles Avenue, east of Heart Lake Road (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit: , Drawing Nos 1 and 15 Contract #83-137 dated July 1983 and August 1983 respectively -3- B-307 2 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property Town of Ajax Cherry Road, The Regional Municipality of Durham Res #240 Moved by J S Scott Seconded by H C Lawrie THAT the report (August 31, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED Re: Project: Land Acquisition Project 1982-1984 - Waterfront Component Pickering/Ajax Sector Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property Cherry Road Owner Town of Ajax Area to be acquired 0 406 acres, more or less Recommended purchase price Nominal consideration of $2 00, plus legal and survey costs "Included in the requirements for the above-noted project is an irregu1ar1y- shaped parcel of land, being Cherry Road, established by Registered Plan 285, Town of Ajax (The Regional Municipality of Durham) "Negotiations have been conducted with officials of the Town of Ajax, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal sum of $2 00, plus 1eqal and survey costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that th~ legal firm of Gardiner, Roberts be lnstructed to complete the purchase All reasonable costs and disbursements are to be paid The Authority is to receive con- veyance of the land required free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-12-401 - Waterfront Open Space " 3 WATER MANAGEMENT CLASS ENVIRONMENTAL ASSESSMENT FOR THE CONSERVATION AUTHORITIES OF ONTARIO Res #241 Moved by: Mrs L. Hancey Seconded by E Fu1 ton THAT the Association of Conservation Authorities of Ontario is hereby authorized (a) to submit an environmental assessment entitled "Water Management Class Environmental Assessment - 1983 - The Conservation Authorities of the Province of Ontario" to the Minister of the Environment under the Environmental Assessment Act on behalf of The Metropolitan Toronto & Region Conservation Authority, and on behalf of any other Conservation Authorities authorizing the Association of Conservation Authorities so to do and (b) to act as agent of the Conservation Authorities of Ontario in doing any act necessary to obtain an acceptance of the environmental assessment and approval of the undertaking dealt with in the environmental assessment under the Environmental Assessment Act B-308 -4- 4 AMO REPORT 83-5 Reform and Revision of Conservation Authorities in Ontario Res #242 Moved by Mrs L Hancey Seconded by H C Lawrie THAT the report on the recommendations of the Association of Municipalities of Ontario on Reform and Revision of Conservation Authorities in Ontario, as amended, be received and forwarded to the Association of Conservation Authorities of Ontario CARRIED 5 QUOTATION #CLM83-34 -Indian Line Campground Superintendent's Residence Windows & Doors The following quotations were received for the supply of windows and doors for the Superintendent's residence at the Indian Line Campground , Supplier Price Quoted Dashwood Industries Ltd S5,401 36 Lock-Wood Windows Ltd S5,445 18 Arnold Lumber Ltd S6,217 98 Robert Hunt Corp S7,200 03 Res #243 Moved by H C Lawrie Seconded by S A Macpherson THAT the quotation of Dashwood Industries Ltd for the supply of all required double-glazed windows and doors for the Indian Line Campground Superintendent's residence, in the sum of $5,401 36 (Provincial Sales Tax included) be accepted it being the lowest quotation received CARRIED 6 SOUTH THACKERAY SANITARY LANDFILL SITE -Proposed Leasing of lands Downsview Radio Control Fliers Motion Moved by L Martin Seconded by S A Macpherson THAT the application of the Downsview Radio Control Fliers for permission to use the South Thackeray Sanitary Landfill Site as a flying field for radio- controlled model aircraft be refused THE MOTION WAS -------------------------------------------------- NOT CARRIED Res #244 Moved by J S Scott Seconded by M W H Biggar THAT the staff be directed to pursue an agreement with the Downsview Radio Control Fliers for their use of the South Thackeray Sanitary Landfill Site as a flying field for radio-controlled model aircraft THAT such agreement not exceed a one-year term, with the Authority reserving the right of termination in the event af objection by local municipalities AND FURTHER THAT no permanent structures be erected on the site CARRIED 7 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE -Operating Expenditures Res #245 Moved by E Fulton Seconded by Ms S Nimmo , THAT consideration of the report on the Black Creek Pioneer Village Visitor Centre Operating Expenditures be deferred to the next regular meeting of the Executive Committee scheduled to be held 5 October, 1983 CARRIED -5- B-309 8 VACANT STAFF COMPLEMENT POSITION -Water Resource Division Res #246 Moved by Mrs L Hancey Seconded by S A Macpherson THAT the vacant position Manager of Planning and Environment be advertised and filled as soon as possible CARRIED 9 DECISION OF HEARING -Car1ro Holdings Limited City of Mississauga Etobicoke Creek Watershed Res #247 Moved by E V. Ko1b Seconded by Mrs L Hancey THAT the application of Car1ro Holdings Limited, in accordance with Ontario Regulation 170, for permission to place fill and construct a building and driveway on Lot 10, Concession 4, E H S , City of Mississauga (Etobicoke Creek watershed) be refused for the following reason That the application, as submitted, will affect the control of flooding CARRIED UNANIMOUSLY NEW BUSINESS 9 Res #247 Moved by L Martin Seconded by E Fulton THAT certain ~rsonne1 matters be dealt with in camera CARRIED 10 Res #248 Moved by E Fulton Seconded by Ms S Nimmo THAT the Secretary-Treasurer in conjunction with the legal firm Gardiner Roberts negotiate a separation settlement with Mr K G Higgs ABSTAINED FROM VOTING - M W H BIGGAR CARRIED 11 TERMINATION On motion the meeting terminated at 11 50 a m , September 14 1983 Florence E Ge11 W E Jones Chairman Secretary-Treasurer KC ~ 8-310 , the metropolitan toronto and region conservation authority minutes REPORT #:16/83 EXECUTIVE COMMITTEE' 5-0CTOBER-1983 #16/83 The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview, on Wednesday,S October, 1983. PRESENT Chairman Mrs. F.E. Ge11 Vice-Chairman E.V. Ko1b Members W G. Barber 'M.W.H. Biggar E. Fulton Mrs. L. Hancey H C. Lawrie S A. Macpherson Ms. S Nimmo J.S Scott Mrs. N. Stoner Chairman, B Harper Bull Conservation Fellowship Awards Committee Dr. T H Leith B HARPER BULL CONSERVATION FELLOWSHIP AWARDS - 1983 Dr T H. Leith, Chairman, B. Harper Bull Conservation Fellowship Awards Committee, introduced two of the recipients Michelle Gavine and Eddie Bevilacqua, emphasizing the difficulty of selecting the winners from among the very high calibre of participants The third recipient, Margaret Baker, could not be present. The Chairman presented the awards and congratulated the recipients on their achievements EXPERIENCE '83 - PROGRAM #1601 -Final Report Valerie Ashton, Co-ordinator, presented. her report Res #249 Moved by Mrs L Hancey Seconded by S A Macpherson THAT the report on Experience '83 - Program #1601, be received, AND FURTHER THAT the following action be taken (a) Valerie Ashton, Co-ordinator, Experience '83 - Proqram #1601, be thanked for her excellent report, (b) Copies of the report be forwarded, for information, to the Ontario Youth Secretariat and the Minister of Natural Resources, (c) The Authority thank the Province of Ontario for its sponsorship of the Experience '83 program, and request the Province to give careful consideration to the recommendations contained in the report in planning for future Experience programs, (d) The recommendations contained in the report be passed to the 1984 Experience Co-ordinator, if and when appointed CARRIED MINUTES Res #250 Moved by Mrs N Stoner Seconded by S A Macpherson THAT the Minutes of Meeting #15/83 be approved CARRIED B-3J.1 -2- DECLARATIONS As a retired employee of Bell -Canada, MR W G BARBER declared a Conflict of Interest regarding Items 6A(4) and GA(5) herein He did not participate in discussion or vote on these items SECTION I FOR CONSIDERATION 1 PROJECT FOR UPDATING OF THE GOODWOOD PUMPING STATION Res #251 Moved by M W H Biggar Seconded by Mrs N Stoner THAT the staff report having regard to the Goodwood Pumping Station be received AND THE EXECUTIVE COMMITTE RECOMMENDS THAT the Project for Updating of the Goodwood Pumping Station, Community of Goodwood, Township of Uxbridge (The Regional Municipality of Durham), dated August 1983, as appended as Schedule "A" of these Minutes, be adopted, AND FURTHER THAT the following, action be taken (a) The Regional Municipality of Durham be designated as the benefiting municipality on the basis set forth in the project, (b) The Government of Ontario be requested to approve the project and a grant of 55% of the cost thereof, (c) If required, the approval of the Ontario Municipal Board be requested for the project, pursuant to Section 23 of the Conservation Authorities Act, (d) When approved, the appropriate Authority officials be authorized to take whatever a~tion is required in connection with the project, . including the execution of any documents, (e) Upon completion of the project, the operations and maintenance requirements of the Goodwood pumping system and associated drainage works be transferred to the Township of Uxbridge.. CARRIED 2 REPORT #2/83 CONSERVATION LAND MANAGEMENT ADVISORY BOARD Res #252 Moved by H C Lawrie Seconded by W G Barber THAT Report #2/83 of the Conservation Land Management Advisory Board be received, AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #3, as set forth herein, be approved #3 THAT the fee schedule amendments to Ontario Regulation #139/80, regulation made under the Conservation Authorities Act as appended as Schedule "B" of these Minutes, become effective January 1, 1984 CARRIED 3 REPORT #2183 INFORMATION & EDUCATION ADVISORY BOARD Res #253 Moved by Ms S Nimmo Seconded by Mrs N Stoner THAT Report #2/83 of the Information & Education Advisory Board be received AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #3, as set forth herein be approved #3 The amendments to Ontario Regulation 139/80 as Amended, Regulation made under The Conservation Authorities Act as amended and appended as Schedule lie" of these Minutes, become effective January 1st, 1984, and September 1st, 1984 CARRIED -3- B-312 4 REPORT #4/83 BUDGET & FINANCE SUB-COMMITTEE Res #254 Moved by W G Barber Seconded by E V Kolb THAT Report #4/83 of the Budget & Finance Sub-Committee be received AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #2, as set forth herein, be approved #2 THAT the 1984 Pre1im4nary Budget as submitted by the Functional Advisory Boards, and as amended and appended as Schedule "D" of these Minutes, be received and approved, AND FURTHER THAT subject to funding approvals yet to be received from the Province of Ontario, the Prelxminary Budqet be reduced, as follows PROJECT AMOUNT BUDGET PAGE # Urban and Rural Drainage S 27,000 V-7 Erosion & Sediment Control 65 000 V-7 Prior4zation Studies 40,000 V-ll C L M Sundry Development 15 ,575 VI-9 Cold Creek Rifle Range 15,750 VI-9 Ind4an L4ne Campground 120,000 VI-9 Heart Lake Washroom 80,000 VI-9 Upgrade maintenance 80,000 VI-ll E S A Management 25,000 VI-16 Upstream Erosion 6,000 VI-18 Fish Management 5,000 VI-20 Wildlife Management 10,000 VI-20 Kortr4ght Development 100,000 VII-17 B C P V BU41d4nq Activities 201,500 VIII-7 790,825 . in order to reduce the general levy increase over 1983 from 31 1% to 18 4% AND FURTHER THAT application be made to Canada Works (Employment and Imm4gration Canada) for the undertaking of the follow4ng projects PROJECT AMOUNT Urban and Rural Drainage $ 27 000 Pr4or4zation Structures 40 000 Sundry Development 15,575 Cold Creek Rifle Range 15,750 Heart Lake Washroom 80,000 Upgrade Maintenance 80,000 Upstream Erosion 6,000 Fish Management 5 000 Wildlife Management 10 000 Kortright Development 50,000 B C P V Building Activit4es 201,500 530,825 CARRIED 5 THE METROPOLITAN TORONTO & REGION CONSERVATION FOUNDATION -Re-appo4ntment of Member Res #255 Moved by W G Barber . Seconded by H C Lawr4e THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr Eldon T Jackson be re-apP04nted to The Metropolitan Toronto and Region Conservat4on Foundation for a further three-year term from 25 November 1983 to November 25 1986 CARRIED B-313 -4- SECTION II FOR INFORMATION 6 CORRESPONDENCE Mr Ii A McLean Acting General Manager, reported receipt of the following correspondence (a) Further to information provided to the Committee at Meeting #15/83, Mr McLean stated that by letter of September 21, the Minister advised that a Flood Plain Criteria Review Committee had been appointed, and urqed the Authority to make written and oral presentations Messrs McLean and Mather of the staff, and Mr J Parkinson, legal representative for the Authortty, attended a hearing on Monday of this week and orally presented the comments and views of the M T R C.A , which, it is felt were, well received The Borouqh of Scarborough presented a very good statement of its , view of the Authority's management of the flood plains within ScarQorough also, representatives of the Federation of Ontario of Naturalists and Save the Rouqe Valley were qui~e complimentary It is possible a subsequent meeting may be held in view of complaints made on the above occasion of lack of sufficient notice of the first hearing (b) A letter from the ~hairman of The Association of Conservation Authorities of Ontar~o to the Chairman of the M T R C A , advising that th-e Association, wh~ch is presently accommodated in the Regional Offices of the Ministry of Natural Resources in Richmond Hill, is seeking a central location and requesting that this Authority consider leasing office space for t,h~s purpose Res #256 Moved by M Ii H Biggar Seconded by Mrs L Hancey THAT the Secretary-Treasurer be authorized to enter into neqotiations with The Association of Conservation Authorities of Ontario for the rental of suitable office space at the Black Creek Pioneer Village Visitor Centre when such accommodation becomes available CARRIED (c) Letter from Central Req~on advis~ng that the Ministry's review of the Authority's preliminary 1984 budget will take place on October 25 at 2 00 p m The Authority will be represented by the Chairman the Chairman of the Budget & Finance Sub-Comm~ttee and appropriate staff 7 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #257 Moved by Mrs L Hancey Seconded by Mrs N Stoner THAT the applications listed herein as A(l) to A(16l inclusive be approved, . subject to the conditions contained in the reports CARRIED A(l) Town of Richmond Hill To construct pedestrian bridge in Richvale Greenway Park across Little Don River In accordance w~th the following documents and plans, which shall form part of the permit Job #83032 prepared by Mitchell, Pound & Braddock Ltd and dated July 15 1983 B-314 -5- A(2) Dr & Mrs Pape To re-grade area for preparat~on of in-ground swimming pool site #17 Denver Crescent City of North York (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan and cross section submitted with the application A(3) The Regional Munic1pality of Peel To construct watermain across Humber River, west of Highway #50, north of King Street, Villaqe of Bolton, Town of Ca1edon In accordance with the following documents and plans, which shall form part of the permit , Plan #5242-0 prepared by The Regional Munic~pality of Peel, Department of Public Works, and dated November, 1982 A (4) Bell Canada To install buried cable across small tributary of the Berczy Creek, N1neteenth Avenue, west of Woodbine Avenue Town of Markham. (Rouqe River Watershed) In accordance with the following documents and plans, which shall. form part of the permit Plan RW #1 Order #959223, prepared by Bell Canada, and dated September 12 1983 A(5) Bell Canada To construct concrete-encased conduit crossing the West Branch of the Don River at Dufferin Street, north of Stee1es Avenue, Town of Vaughan In accordance with the fo1low1ng documents and plans wh~ch shall form part of the permit Plan #401 as prepared by Bell Canada, and dated August 17 1983 A (6) The Mun~cipa11ty of Metropol~tan Toronto To construct 3-metre w1de pedestrian/bicycle/service vehicle path from Steeles Avenue south ot Rowntree Mill Park City of Etobicoke (Humber River Watershed) In accordance with the followinq documents and plans, wh~ch shall form part of the permit A detailed topographic map showing the proposed walkway alignment and dated September 1983 A(7) Paracon Brampton Inc To construct storm sewer outfall to the Etob~coke Creek west of Highway #10 north of Charolais Boulevard, City of Brampton In accordance with the following documents and plans which shall form part of the permit Drawing #16 dated July 1983 Drawing #28 dated September 1983, and Draw~ng U M 1 dated September 1981 all prepared by Underwood McLellan Lim1 ted B-315 -6- 11.(8) Brama1ea Limited To construct storm sewer outfall to branch of the Etobicoke Creek, south of Bovaird Drive, west of Dixie Road, City of Brampton In accordance with the following documents and plans, wh~ch shall form part of the permit The Grading and Storm Outfall plans, prepared by Johnson Sustronk Weinste~n & Associates Ltd and dated August 25, 1983, and October 19, 1979, respectively 11.(9) Eileen & Michael Connor To place fill at rear of #1 Lakehurst Crescent, City of Scarborough (Waterfront) In accordance with the following documents and plans which shall form part of the permit The report prepared and submitted by the owner with his application, dated June 9, 1983 as revised June 16, 1983, and additional revision dated August 12, 1983 11.(10 ) Beaupit, Martin, Kubik, Hansen, Ubanski -&- the City of Etobicoke To repair retaining wall at #361 to #377 Lake Promenade (Waterfront) In accordance with the following documents and plans, which shall form part of the perm~t Sec~ion plans prepared by John Heck &"Sons Limi ted 11.(11) Baif Associates Limited To construct storm sewer outfall and swale to the Don Ri ver south of We1drick Road, west of Avenue Road, Town of Richmond Hill In accordance w~th the following documents and plans, which shall form .. part of the perm~t Drawing #4, Project #10-83033 prepared by Marshall, Macklin Monaghan Limited and dated July 1983 11.(12') 370196 Ontario Limi ted To enclose small tributary of the Etobicoke Creek in storm sewer pipe, and ~e-construct storm outlet headwall south of Bovaird Drive, east of Kennedy Road, City of Brampton In accordance with the following documents and plans which shall form . part of the permit Sheets #1 3 4 17 and 19 as prepared by Fred Schaeffer & Associates Limited and dated March 1983 11.(13 ) Mrs Phyllis Hess To place fill with~n regulated area #2137 Lakeshore Blvd West, City of Etob~coke (Waterfront) In accordance w~th the following documents and plans wh~ch shall form part of the permit A site plan and cross section subm~tted with the application -7- 9-316 A(14) Moorville Properties Inc To place fill within regulated area and alter a watercourse, south of Vodden Street, east of Hiqhway #10 City of Brampton (Etobicoke Creek Watershed) In accordance with the following documents and plans which shall form part of the permit Drawings #11, 17 18, 19, and 25, Project #91-ES-605, prepared by Fred Schaeffer & Associates Inc , and dated May 1983 A( 15) Marview Construction Limited To place fill in regulated area, east of Netherhart Road, north of Britannia Road. City of Mississauqa (Etobicoke Creek Watershed) In accordance with the following documents and plans which shall form part of the permit Draw~ng #1, prepared by Mark Engineering L~mited. and dated September 1983 A(16) Norma Louise Alm To construct two storm sewer outfalls to tributaries of the Rouqe River, west of Bayview Avenue, north of Nineteenth Avenue, Town of Richmond Hill In accordance with the fo~lowing documents and plans which shall form part of the perm~t Drawing #1 to #4 Project #210-82 prepared by G & L Engineering Ltd , and dated July 1983 8 PROJECTS FOR EROSION CONTROL & SLOPE STABILIZATION IN THE MUNICIPALITY OF METROPOLITAN TORONTO, AND THE ~ REGIONAL MUNICIPALITIES OF PEEL YORK & DURHAM 1982-1984 -1984 Programs Res #258 Moved by M W H Biggar Seconded by Mrs N Stoner THAT the Progress Reports and the Pools of Eros~on Priority Sites for 1984 be received AND FURTHER THAT the 1984 Work Programs and the Pools of Erosion Prior~ty S~tes for The Municipality of Metropolitan Toronto, and The Regional Municipalities of Peel York, and Durham, as appended as Schedule IIE" of these Minutes be approved CARRIED Res #259 Moved by E V Kolb Seconded by Mrs L Hancey THAT the staff be directed to forward copies of the Projects to the affected munic~palities for information, and advise them that the Authority will be consider~ng these projects CARRIED 9 HUMBER RIVER CHANNEL IMPROVEMENTS CONTRACT PHASE II - FORMER VILLAGE OF BOLTON -Extra Work Orders Nos 2 & 3 Res #260 Moved by M W H Biggar Seconded by Mrs N Stoner , THAT Extra Work Orders Nos 2 and 3 to the contract for the Humber River Channel Improvements ~hase II - former Village of Bolton ~n the amounts of $747 00 and $12 847 00 respect~vely be approved AND FURTHER THAT the approval of the Ministry of Natural Resources be requested CARRIED -- B-317 -8- 10 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property The Corporation of the Town of Vaughan South side Highway #7. west of Kipling Avenue Res #261 Moved by M W H Biggar Seconded by Mrs N Stoner THAT the report (September 21, 1983) set for~h herein received from the - Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED Re Project Land Acquisition Project 1982-1984 - Flood Plain & Conservation Land Component Humber River watershed Authority Executive Resolution #88 Meeting #4 - April 8, 1981 and Authority Resolution #38 Meeting #3 - May 15 1981 Subject property South s~de Highway #7 Owner The Corporat~on of the Town of Vauqhan Area to be acquired 1 968 acres more or less Recommended purchase price Nominal consideration of $2 00 plus 1eqa1 and survey costs "Included in the requirements for the above-noted project is an irregular1y- shaped parcel of land be~ng All of Block 27 Plan 65M-2163 Town of Vauqhan (The Regional MunicipalJ.ty of York) located on the south side of Highway #7 west of Kipling Avenue "Negotiations have been conducted with officials of The Corporation of the Town of Vaughan and subject to the approval of your Committee aqreement has been reached with respect to a purchase price, as follows The purchase price ~s to be the nominal consideration of $2 00, plus legal and survey Costs with date of completing the trans- action to be as soon as poss~ble "I recommend approval of this purchase and that the legal firm of Gardiner Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid The Authority is to receive con- veyance of the land required free from encumbrance with the exception of an existing service easement "The Administrator of the Water Resource Division has reviewed this proposed acqu~sition and is in concurrence w~th my recommendat~on "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "Funds are available for this acquisition - Account 0-04-11-401 - Flood Plain Land Acquisition n , 11 FORMER MINISTRY OF HOUSING PROPERTY GREEN RIVER PARK TOWN OF PICKERING (DUFFIN CREEK WATERSHED) Res #262 Moved by M W H Biggar Seconded by Mrs N Stoner THAT the Manager of Property & Administrative Serv~ces be directed to advise Evdok~a Moumouris that the Author~ty-owned lands in the Town of Pickering forming part of Green River Park will not be available to them for further rental and that the park operation on Authority-owned lands must be terminated on December 31 1983 CARRIED . -9- B-318 12 MINISTRY OF GOVERNMENT SERVICES -Request for Authority-owned land for widening of Highway #50 Res #263 Moved by M W H Biggar Seconded by Mrs N Stoner WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Ministry of Government Services to convey two parcels of Authority-owned land required to facil~tate the widening of Highway #50 AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Ministry of Government Services in this instance THAT two parcels of Authority-owned land, containing a total of 9 11 acres more or less be conveyed to the Ministry of Government Services to facilitate the widening of Highway #50 north of Stee1es Avenue said lands beinq shown as Parts 1 and 2 on Plan 43R-10599, and Parts 1 2 and 3 on Plan 43R-1060~, and being Parts of Lots 1 and 2 Concession IX N D City of Brampton (The Regional Municipality of Peel) Consideration to be the sum of $205,000 00, plus legal, survey appra~sal landscaping and any other costs involved in completing the transaction THAT said conveyance be subject to an Order-in-Council being issued in ac- cordance with Section 21(c) of The Conservation Apthorities Act R S 0 1980 Chapter 85 as amended AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever act~on may be required to give effect thereto including the obta~ning of necessary approvals and the execution of any documents CARRIED 13 REPORT #2/83 WATERFRONT ADVISORY BOARD . Res #264 Moved by E Fulton Seconded by H C Lawrie THAT Report #2/83 of the Waterfront Advisory Board be received AND FURTHER THAT the fol1ow~ng recommendation be approved The 1984 Preliminary Budget Estimates as appended as Schedule "A" of of the Minutes of Meeting #2/83 of the Waterfront Advisory Board held 9 September 1983 be included in the 1984 Preliminary Budget of the Author~ty CARRIED 14 1983 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM -Extension Res #265 Moved by W G Barber Seconded by S A Macpherson THAT the existing contract with Proctor & Redfern Limited be increased by $4 500 00 to undertake additional sediment chemistry and benthic taxonomy AND FURTHER THAT approval to the terms of reference be requested from the Ministry of Natural Resources CARRIED 15 1982 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM -Data Analyses Res #266 Moved by W G Barber Seconded by S A Macpherson THAT IEC BEAK Consultants Limited be retained at a cost not to exceed $7 500 00, to undertake an examination of sediment chemistry and benthic lnvertebrate results in relation to water circulation and sediment dlstribution patterns B-319 -10- AND FURTHER THAT approval of the terms of reference be requested from the Min~stry of Natural Resources CARRIED 16 AJAX WATERFRONT Res #267 Moved by H C Lawrie Seconded by W G Barber THAT the firm of Proctor & Redfern Ltd be retained to complete a preliminary engineering study for a sewage pumping facility to serve the Rotary Park picnic area, Town of Ajax, at an estimated total cost of $3,250 00 CARRIED 17 REPORT #2/83 CONSERVATION LAND MANAGEMENT ADVISORY BOARD t Res #268 Moved by H C. Lawrie Seconded by W G Barber THAT Report #2/83 of the Conservation Land Management Advisory Board be received, , , THAT Recommendat~on #2, as set forth herein, be approved #2 THAT the 1984 Preliminary Budget, 'as append~ as Schedule "A" of the Minutes of Meeting #2/83 of the Conserva io~ Land Management Adv~sory Board, held 16 September 1983, be included in the 1984 Preliminary Budget of the Authority AND FURTHER THAT considerat~on of Recommendation #4, as set forth herein, be deferred, for further information, to the next regular meeting of the Executive Committee , #4 THAT the concept of environmentally significant areas be recognized as a component of The Metropolitan Toronto and Region Conservat~on Author~ty's implementation of its mandate THAT the Watershed Plan, in particular the Land Acquisition Program and the Conservat~on Land Management Program, be amended to incorporate the ESAs currently ~dentif~ed and the concepts of ESA management, THAT environmental reviews be undertaken for all proposed MTRCA works which may impact ESAs and, where potential impacts are identified, the means of mitigating these potential impacts be addressed, . THAT individual management plans be prepared for ESAs on land owned and managed by the MTRCA Other public agencies who manage MTRCA land or own and manage their own land be requested to prepare individual ESA management plans, with the assistance of the MTRCA or other appropriate agencies THAT management guidelines be prepared by the MTRCA explaining the significance of ecological systems (i e marsh, forests, etc ) , and identifying the benefits/disbenefits of various actions, THAT a strategy be prepared within the Community Relations Program to inform and/or educate the general public and private landowners con- cerning ESAs THAT all master drainage planning undertaken by the MTRCA or in con- junction with the mun~cipalities, other agencies, or developers recognize and incorporate ESAs THAT the MTRCA utilize ESA information as part of the data base for the municipal plan review process, THAT the regulatory powers of the MTRGA under Section 28 of the Conservation Authorities Act, with respect to the placing or dumpinq of fill be investigated as to their potential to include those ESAs not currently regulated -11- B-320 THAT the ESA data base be maintained and defined in conjunction with the MTRCA's member municipalities, the Province of Ontario, affected agencies, special interest groups, and others AND FURTHER THAT copies of the Environmentally Significant Areas Study (1982) be forwarded to the Author~ty's member mun~cipa1ities and other appropriate government agencies and interest groups as a back- ground resource document CARRIED Res #269 Moved by H C Lawrie Seconded by Mrs L Hancey THAT the preferred plan for the Master Plan of the Boyd Conservation Area be received for information, AND FURTHER THAT the staff be directed to finalize the p1ann~ng study, taking into consideration public and advisory boards' comments, and circulate the draft document to the affected municipalities for comments CARRIED 18 QUOTATION #CLM83-31 -Claireville Conservation Area Saddle House Hydro The following quotations were received for the supply of equipment, labour, and material for the installation of a 100-amp hydro service at the C1airevil1e Conservation Area Saddle House SUPPLIER Amount Jack Langen E1ec~ric Ltd $2,475 00 Sturdy Power Lines $2,986 00 Res #270 Moved by H C Lawrie # Seconded by S A Macpherson ~ THAT the quotation of Jack Langen Electric Ltd for the supply of equipment, labour and materials for the installation of a 100-amp hydro service at the Clairev~lle Conservation Area Saddle House, in the sum of $2,475 00 plus Provincial Sales Tax be accepted, it being the lowest quotation received CARRIED 19 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE -Operat~ng Expenditures Res #271 Moved by M W H Siggar Seconded by S A Macpherson THAT the staff report and addendum on projected operating expenditures for the Black Creek P~oneer Village V~sitor Centre be received CARRIED 20 REPORT #2/83 HISTORICAL SITES ADVISORY BOARD Res #272 Moved by M W H. Biggar Seconded by E Fulton THAT Report #2/83 of the Historical Sites Advisory Board be received AND FURTHER THAT the following recommendat~on be approved The 1984 Preliminary Budget, as appended as Schedule "A" of the Minutes of Meeting #2/83 of the Historical Sites Advisory Board, held 15 September 1983, be ~ncluded in the 1984 Preliminary Budget of the Authority CARRIED B-321 -12- 21 REPORT #2/83 INFORMATION & EDUCATION ADVISORY BOARD Res #273 Moved by Ms S Nimmo Seconded by Mrs N Stoner THAT Report #2/83 of the Information & Education Advisory Board be received AND FURTHER THAT Recommendations #1, #2, #4, and #5, as set forth herein, be approved #1 The Boyd Master Plan be approved in principle, AND FURTHER THAT more detailed expressions of the components within the Plan, such as the specifics of farm demonstration and camping areas, be presented to relevant Advisory Boards for consideration before the Plan is put before the Authority for approval , . #2 Consideration be given to ways and means of incorporating special programs and promotions related to member municipalities' special celebrations which are tied into the Province's bicentennial in 1984, #4 The policy of family admission at the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation, be reviewed and defined, I #5 The 1984 Preliminary Budget for the Informat~on and Education Division as appended as Schedule "B" of the M~nutes of Meeting #2/83 of the Information & Education Advisory Board, held 16 September, 1983, be included in the 1984 Preliminary Budget of the Authority CARRIED 22 REPORT #3/83 BUDGET & FINANCE SUB-COMMITTEE Res #274 Moved by Mrs N Stoner Seconded by W G Barber THAT Report #3/83 of the Budget & Finance Sub-Committee be received, THAT staff conduct a Program Perfor~ance Appraisal as soon as possible after the 1983 Budget year, AND FURTHER THAT such appra~sal be submitted to the Budget & Finance Sub- Committee CARRIED 23 REPORT #4/83 BUDGET & FINANCE SUB-COMMITTEE Res #275 Moved by W G Barber Seconded by E V Kolb THAT Report #4/83 of the Budget & Finance Sub-Committee be received THAT the revised Ministry of Natural Resources Audit of 1981 Expenditure Reports be approved, AND FURTHER THAT the Secretary-Treasurer be authorized and directed to issue a cheque to the Treasurer of OQtar~o in the amount of $3,455 20 CARRIED -13- B-322 24 FINANCIAL REPORT AND ACCOUNTS -Months Ending July 31, 1983. & September 4, 1983 Res #276 Moved by Mrs N Stoner Seconded by 5 A Macpherson THAT the Divisional Expenditure Summaries for the periods July 1-31, 1983, and August I-September 4, 1983, as appended as Schedule "F" of thse Minutes, be received, AND FURTHER THAT payment of the Authority accounts, in the amounts of 51,675,995 00 for the month of July, 1983, and 51,990,985 00 for the month of August 1983, be approved CARRIED . . 25 A~BION HIL~S CONSERVATION FIELD CENTRE -Major Maintenance Roof Replacement The following quotations were received for replacement of the roof at the Albion Hills Conservation Field Centre Firm Price Quoted'" Provincial Industrial Roofing & Sheet Metal Co ~td 533,450 00 Semple-Gooder Roofing $46,500 00 Dean Chandler Co ~td $49,800 00 "'Includes.Federal and Provincial Taxes Res #277 Moved by Mrs N Stoner Seconded by M W H Biqgar THAT the proposal of Provincial Industr~al Roof~ng & Sheet Metal Co Ltd dated September 19, 1983, for the replacement of the roof at the Albion Hills Conservat~on Field Centre in the amount of $33,450 00 (including Federal and Provincial Taxes) be accepted CARRIED 26 NEW BUSINESS The Act~ng General Manager tabled an item, entitled "Operating Statement - Black Creek Pioneer Vlllage", for cons~deration at the next regular meeting of the Executive Committee Having regard to the 1984 Prelimlnary Budget, MS S NIMMO requested that, on behalf of the Information & Education Advisory Board it be recorded that the implementation of a major marketing program cannot be achleved within the small amount budgeted (Page VII-11 refers) 27 TERMINATION On motion, the meetlng termlnated at 11 30 a m October 5, 1983 , florence E. Gell W E Jones Chalrman Secretary-Treasurer B-323 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY . PROJECT FOR UPDATING OF GOODWOOD PUMPING STATION COMMUNITY OF GOODWOOD TOWNSHIP OF UXBRIDGE THE REGIONAL MUNICIPALITY OF DURHAM , AUGUST, 1983 . B-324 CONTENTS OF BRIEF I ?UR?OSE II LOCATION AND DESCRI?TION III HISTORY OF FLOODING IV COSTS AND FINANCING V A??ROVALS , , . , , , B-325 I PURPOSE The purpose of this project is to permit The Metropolitan Toronto and Region Conservation Authority to exercise the powers afforded by The Conservation Authorities Act R S 0 1970, Chap 78, as amended to establish and undertake in the area over which it has jurisdiction, a program designed to further the conservation, restoration, development and management of natural resources in accordance with the Flood Control Program of the Watershed Plan The purpose of this project is to meet one of the defined objectives of the Flood Control Program which is to maintain flood control structures as required in order that they can continue to perform as designed. Through this project, The Metropolitan Toronto and Region Conservation Authority will replace the twenty-five year old flood control pumping facility within the community of Goodwood in the Township of Uxbridge The completion of the improved pumping facility will enable the Authority to continue to provide the existing level of flood protection provided to the community since the station was constructed by the Authority in 1958 , . B-326 II LOCATION AND DESCRIPTION The community of Goodwood is located in the Township of Uxbridge on Highway 047 between the Village of Stouffville and the Town of Uxbridge The community was developed within an area of irregular terrain and is situated in a depression or bowl from which no natural overland drainage outlet exists (see attached location map) As a result of the community's location, flooding has been a problem since its inception (see attached section on History of Flooding) The flooding problems associated with Goodwood were identified in the 1956 R D H.P Conservation Report prepared by the Department of Planning and Development, and as a consequence of this report, a study of the flooding situation was undertaken by W 0 Chisholm, Consulting Engineers The study completed in June of 1957 for The Metropolitan 7oronto and Region Conservation Authority recommended that a pumping facility and internal drainage network be constructed to alleviate t!1e flooding problem The works recommended within the above report were constructed in 1958 at an estimated cost of $37,000 and consisted of a , pumping station and collection system which receives the local surface drainage. The flood waters drained to the pumping station from within th~ community are pumped southerly over the height of land to 'a small watercourse draining to the Duffin Creek The existing flood control system has now been operating for over twenty-five years and for the most part has protected the community from any significant flood damage During the lengthy operation period of the system, a number of probl~~s have hindered the efficient vperation of the station Perhaps the most common has been the free~ing of the intake structure, this is due to the cesign of the intake and that the intake is not located within t!1e building which would facilitate heating Along with the above mentioned problems, the age of the facility has become a concern, with replacement components becoming unavailable and increasing maintenance costs being required to maintain operation Also since the pump must b~ started manually, the Author it y ~ust hire an operator to ensure the operation of the pumping facility when requi:-ed I\s a result of the problems arising with the system, the age of the pumping facility and the expeoted increases in maintenance and operational costs, a study wa~ commissioned by the AuthQrity to investigate the present facility The study was also to determine what changes were required to update the system in order to maintain the level of flood protection presently being provided to the community of Goodwood The study entitled 'Modifications to Goodwood Pumping Station' was completed in December of 1982 by Chisholm, Fleming and Associates and outlined several schemes to incorporate an updated flood control system for the community After reviewing the alternatives described within the report, the Authority is proposing to undertake the construction of the alternative requiring a complete reconstruction of the pumping faCility The works being proposed include the demoli~ion of the existing pumphous~ and the construction of an underground chamber to house two new submersible pumps slong with the piping of the intake ditch This new structure will facilitate the heating of the intake assembly to negate the effects of ice and ensure the efficient operation of the pumping system Also proposed is the conversion of the existing diesel engine to provide standby power in order to maintain operation in the event of a power failure to the pumping system Electrical modifications are also proposed to completely automate the pumping facili ty Automation of the system will improve the effective use of the pumps as well as remove the need for an operator, thus reducing the operational costs . 8-327 As mentioned, the proposed works will result in several benefits, i e the level of flood protection previously provided by the Authority to the community of Goodwood will be maintained, a reduction in operational expenses will occur due to the automation of the system and the anticipated increase in maintenance costs required to continue operation of the existing system will be greatly reduced Since the expected life of the existing system has been reached, as it will for all such facilities, it is therefore essential that the system be updated The Township of Uxbridge and Authority staff have had discussions regarding the Goodwood pumping station in terms of operation and maintenance Staff have indicated to the Township of Uxbridge a desire to see the operations and maintenance aspects of the facility become the responsibility of the Township upon completion of an updating of the existing facility. The operation of this facility by the Township of Uxbridge will result in an additional benefit to this Authority by negating any maintenance costs over the life of the updated pumping station. The overall implications of having the pumping facility under the jurisdiction of the Township would be a reduction in the Authority's operations and maintenance costs and having the operational responsibilities of the Goodwood pumping station in a more logical and appropriate place , . -..-.. .1"' ..,. ,,~__"I:....- ....... ......-.. ----- - .. - - ....... --- --... -- ....- - ----- '" ,.................UO'...-4I. ................. ~........d"""'.. o..I"--.f ....~/_o( ,..... c..,....... u. lJl ,.... _..... .._..~.!>'~ _... I ...... .......__ _.. ___ W IV (J) lJETROPa.ITAN TORONTO AND REGlCll CONSERVATION AUTI.:J/lITY =.-.0010 fa~'L" 329 III HISTORY OF FLOODING Since the inception of the community of Goodwood in the mid-eighteen hundreds, flooding has been a persistent and severe problem The nature of the site allows for no direct outlet for drainage and as a result, surface ponding of flood waters created an annual flooding problem While some flooding of the area was reported during the Hazel storm, the vast majority of flooding problems within the community were restricted to the spring melt period During the melt periods, flooding averaged more than a foot in depth resulting in flooded basements and first floor levels of homes Since no natural outlet was available to drain the flood waters, flooding of the area was reported to last six to ten weeks before the area was completely dry. On several occasions, flooding of septic tanks and wells occurred resulting in potential health problems The area draining to the community is approximately 380 acrs whih produces approximately 80 acre-ft of water during the spring freshet The area of flooding has been deliniated at 45 5 acres resulting in 23 stru9tures being inundated prior to the flood control works being constructed Since the operation of the pumping facility first began in 1958, only minor flood~ng situations have been recorded, mostly due to ice within the drainage network ~ . . 5-330 IV COSTS AND FINANCING The expenditures required to implement this project shall be understood to include engineering and geotechnical studies, site supervision, environmental assessment and all materials, labour, equipment, etc associated with the construction ~ Activity Mobilization/Demobilization ~2,000 00 Site Preparation/Restoration $6,000 CO Construction of underground concrete chamber $35,000.00 Purchase and installation of 2 FYGT 88 HP $51 ,000 00 submersible pumps and motors Piping and connection to existing forcemain $25,000 no Installation of new electrical services $6,000 00 Electrical distribution, lighting and heating .t3,OOO 00 Automation of controls $2,000 00 Conv~rsion of existing ~iesel Sngine $9,000 00 Engineering, leg al , inflation and contingency $36,000 00 allowance PROJECT TOTAL - $175,000 00 Financing !his project will be funded as follows Province of Ontario - $96,250 00 Authority - ~78 ,750 00 The Regional Municipality of Durham be designated as the benefiting municipality to raise the Authority's share of the costs of the works, being 45% of the total , , B-331 V APPROVALS . 8-332 SCHEDULE "Bit ONT~O REGULATION 139/80 A.s Amended REGULATION MADE ONDER THE CONSERVATION AUTHORITIES ACT CONSERVATION AREAS METROPOLIT1\N TORONTO 1\ND REGION SCHEDULE 1 In this Schedule "season" means the summer season that commences on the 1st day of April and ends on the 31st day of October in any year or the winter season that commences on the 1st day of November and ends on the 31st day of March of the next following year. 2 The following fees shall be paid to the Authority for permits issued by the Authority and for the occupation and use of the lands and works, vehicles, boats, recreational facilities and services of the Authority: Proposed 1983 1984 (l) For parking in all conservation areas except Black Creek, Pa1grave, Woodbridge, Claremont, and Humber Trails, { a) for one vehicle carrjing less than ten passengers, ( i) weekends and holidays, per day . . . $ 3.00 $ 3 so (ii) weekdays, excluding holidays, per day . 2 00 2 25 (b) for an annual parking permit for one vehicle carrying less than ten passengers, per yea~ . 30 00 35 00 (c) for one vehicle carrying ten or more passengers, per day . 20 00 20 00 (2) For a permit at Glen Haffy Extension, (a) for the use of each fishing pond, including vehicle parking for not more than twenty vehicles, per day . . . 84 00 100 00 (b) for parking, for each vehicle in addition to the twenty vehicles for which a fee is paid under clause (a) , (i) weekends and holidays, per day . . . " 3 00 3.50 (ii) weekdays, excluding holidays, per day . . . 2 00 2 25 (c) for the use of row boats, including life jackets and oars, when used in conjunction with a permit issued under clause (a) plus Provincial Retail Sales Tax per pond, per day . 2l 00 25 00 (d) for the use of the cabin, when used in conjunction with a permit issued under clause (a) , per day . 26 00 30 00 B-333 - 2 - Proposed 1983 1984 4 For the use of the Heart Lake Recreation Building, the Albion Hills Chalet or the Bruce's Mill Beach Centre, with a minimum fee of $30.00 plus parking fees, per hour . . . . . . 15.00 15 00 5. (1) For the use of the Cold Creek Conservation Field Centre meeting room with a minimum rental fee of $30 00 plus parking fees, per hour. . 15 00 15 00 (2) For the use of kitchen facilities in conjunction with the use of the meeting room for which a fee is paid under sub-item 1, per hour.. . . ... . . . . . 7 SO 7.50 6. (1) For the rental of a row-boat including life jackets and oars, in a conservation area except Glen Haffy Extension, plus Provincial Retail Sales Tax, per hour . . . . . . . . . 3 15 3 25 (2) For the rental of a canoe, including life jackets and paddles, plus Provincial Retail Sales Tax, I (a) per hour. . ... . ... . . . . . . $ 3.65 $ 3 75 . (b) per day . . . . ... . . . .. . . . 15 75 16 SO ill per day, for a group with a reservation, per canoe w~th a ~nimum of 5 canoes - 10 00 (3 ) For canoeing instructions for a group of at least five people, with a reservation, including the use of a canoe, life jackets and paddles, per group member (a) per half-day . . . 4 20 4 SO (b) per day . . . . . . . . . . . . . . 7 35 7 75 (4) For canoeing instruction courses for individuals including the use of a canoe, life jackets and paddles, per course, per person. 42 00 45 00 (5) For group canoeing instruction, other than a group with a reservation, for a one hour lesson, per person.. . . 2 90 3 00 8 For a permit authorizing a corn roast or similar activity after sunset, not including parking, in any conservation area except Black Creek 25 00 8 , . . . . . . . . . 35 00 9 (1 ) For a permit to occupy a specially designated group overnight camp-site, including parking for up to seven nights, (a) for a group of no more than twenty persons, per night. . .. . .. . . . .. . .. . , 11 00 20.00 (b) for each person, in addition to the twenty persons for whom a fee is paid under clause (a), per night . . 55 60 . (2) For a permit to occupy a group day camp-site including parking, per person, per day 55 60 - 3 - B-334 Proposed 1983 1984 10 For a permit to occupy an individual unserviced campsite, (a) at Albion Hills and Cold Creek Conservation Area, per night . . 7 00 8 00 (b) at the Indian Line Tourist Campground, per night. . . . . . . . 8.00 9 00 ( c) at Albion Hills Conservation Area, per season. . . . . 336 00 375.00 11 For electric power and/or water hookups at an individual camp-site, where available, per night. . . 2 00 11 . . . . . . . . . . . . . . . . . . . . . . 11 00 12 For firewood at a conservation area named in paragraph 10, per bundle . . . . . . ... . . . . 1 00 l.00 13 For showers at Albion Hills and Indian Line Tourist Campground, for a controlled time period . 25 25 14 For launching a boat, not including vehi~le parking, per day... . . . . . .. . . . . . .... . . . . $ l.00 $ 1 00 15 For a permit for use of a conservation area for horseback riding, not including vehicle parking, (al per day, per horse . . . 1 00 1.00 (b) per year, per horse. . . . 20 00 20 00 16 For a permit for the operation of an all terrain yehicle, not including vehicle parking, per day . . . 1 00 1 00 18 For use of the Petticoat Creek swimming area, (al per person, per day . . . . . . 55 60 (b) for a book of ten tickets 4.50 5 00 21 For commercial photography or filming in any conservation area, except that part of the Black Creek Conservatin Area known as Black Creek Pioneer Village, (a) for the use of the grounds and environs, excluding staff and equipment, per hour . 25 00 $ 35 00 ( b) for participation by staff of the Authority, (i) during the usual working hours of the staff member, per person, per hour . . . . . . $ 15 00 ~ 15 75 (ii) qfter the usual working hours of the staff member, per person, per hour . . . . . . . . 22 00 24 00 (cl for use of Authority vehicles or tractors, including Authority staff to operate such vehicles or tractors, (i) during the usual working hours of the staff member, per vehicle, per hour . . . 30.00 31 SO (ii) after the usual working hours of the staff member, per vehicle, per hour 35 00 38 00 B-335 - 4 - Proposed 1983 1984 24 For the use of a rifle range at the Cold Creek Conservation Area, (a) for a daily permit, per person . . . . $ 2 00 $ 3 00 (b) for a group permit, not including weekends or holidays, per season . . .. . . . SO 00 60 00 (c) for a special event permit.. . . . . .. . 10 . 00 15 00 25 For the use of an archery range at the Cold Creek Conservation Area, ( a) for a daily permit, per person . .. . . . . . . . . . . . . . . 1.00 1.25 (b) for a season group p~rmit, not including weekends or holidays.. 50.00 60 00 (c) for a special event permit... 10 00 15 00 26. For a special event permit for the use of the trap range at the Cold Creek Conservation Area, per event . . . . . . . . . . . . . . . . 10 00 15 00 27 For the use of an electric trap at the Cold Creek Conservation Area, (a) per day, per person . . . . . . . . 2 00 (a) per round of 25 birds . . . . . . 3 00 (b) a group permit, per sea,son . 100 00 125 00 # . 28 For the use of a manual trap at the Cold Creek Conservation Area for use by up to five persons, (a) on weekends and holidays in the summer season, maximum of one hour 4 00 4 50 (b) on weekdays, other than holidays, in the summer season and on any day during the winter season . 4 00 4 SO 29 For dog trials, at the Cold Creek Conservation Area, (a) for a group permit, per season SO 00 60 00 (b) for a special event permit. ~ . . . 10 00 15 00 31 Subject to paragraphs 33 and 34, for the rental of ski equipment, when available, consisting of skis, boots and poles, (a) for cross-country skiing, (i) for individuals fifteen years of age or over, plus Provincial Retail Sales Tax, per day 1 up to and including 1 00 P m. 7 35 8.00 2. after 1:00 pm... . 5 25 6 00 (ii) for individuals under fifteen years of age, plus Provincial Retail Sales Tax, per day 1 up to and including 1:00 p.m $ 5 25 $ 6.00 2 after 1 00 P m. . 3 65 5 00 - 5 - 8-336 Proposed 1983 1984 32 For the rental of snowshoes, when available, plus Provincial Retail Sales Tax, per day, (a) for individuals fifteen years of age or over.. ....... . . 3.00 3.00 (b) for individuals under fifteen years of age ... .... . . 2.00 2.00 (c) for each individual in a group, wi th a reservation. ..... .. .. . 2 00 2 00 (d) for each individual in a group including planned activity. ... 5 00 5 00 33 For each individual in a group, with a reservation, for cross-country skiing instruction, including the use of cross-country ski equipment and ski trails, per day .. .. 6 30 6 SO 34 (1) For the use of cross-counry ski trails at Albion Hills, Bruce's Mill, and Cold Creek, for an individual equipped with cross-country ski equipment, not including vehicle parking, per day, (a) for each person fi=t~en years of age or over 1 00 2 00 (b) for each person under fifteen years of age. . SO 50 35 ~or entrance to the Claremont (to be deleted) and Pa1grave Forest and Wildlife Areas during the winter season, per day, (a) for each person fifteen years of age 0:' over 1 00 2 00 (b) for each person under fifteen years of age 50 50 36 For group cross-country skiing instruction, other than a group with a reservation, not including parking, for a 1 1/2 hour lesson, per person. 3 65 4- 00 37 For individual one hour lessons for cross-country skiing, when available, per person 7 35 a 00 38 For firewood, including delivery within a radius of thirty-~~o kilometers of the source of sllch firewood, per cubic meter 45 00 45 00 B-337 SCHEDULE I'ell THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY FEE SCHEDULE EFFECTIVE JANUARY 1ST, 1984 AND SEPTEMBER 1ST, 1984 TO ONTARIO REGULATION 139/80, A.S AMENDED REGULATION MADE UNDER THE CONSERVATION A.UTHORITIES ACT PROPOSED PROPOSED PRESENT FEE FEE AS OF FEE AS OF JANUARY 1/84 SEPTEMBER 1/84 Schedule - Section 22 For school visitations at Black Creek Pioneer Village (al Tours, per student 2 25 2 25 2 SO Unguided Tours 1 75 1. 75 1. 75 (bl Christmas Tour 3 00 3.25 3 25 (cl Pioneer Life Program 4 2.5 4 25 4.25 I Schedule - Section 23 For entrance to the Kortright Centre for Conservation (al General Public Adults 2.00 2 00 2 00 Students 1 00 1. 00 1. 00 (bl Students Regular Program 1 SO 1. SO 1 75 Christmas Program 2 SO 2.50 2.50 (cl Family Admission Rate 5 00 5 00 5.00 (dl Annual Individual Membership 15.00 20 00 20 00 (e) Annual Family Membership 25 00 30 00 30.00 Schedule - Section 30 For guided tour at Bruce's 1 00 Mill Maple Syrup Program o 80 1 00 Schedule - Section 40 Fer use of the Cold Creek Conservation Field Centre (al Students 6 00 6 00 7 00 (bl Camping - Site A 3 00 3 00 3 00 - Site B 2 00 2 00 2 00 (c) Skiing/Snowshoeing 2 SO 2.50 Schedule - Section 41 For the Alb~on Hills C A. Farm Program (al Farm Tour - Regular 1 00 1 00 1 00 - Senior 2 50 2 50 Residential Conservation Education Field Centres, program, per day (al Albion Hills C.F C. 712 00 748 00 748 00 (bl Claremont C F C 712 00 748 00 748 00 (cl Boyd Cons F C. 550 00* 578 00* 578 00 Cdl Lake St George C F C. 550.00* 578.00* 578 00 * The fee for Boyd and Lake St. George Conservation Field Centres is based on a 5% increase over 1983 and is subject to the approval of the Joint Planning Commi ttee This fee does not include the cost of teaching staff . THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 1984 PRELIMINARY BUDGET . Authori ty October 14, 1983 en 0 Eli t:I C t"' t>3 lJj I w t:I w = (Xl 1'.!I.!l_!1_E1'~2.!'2.!- I T.!\~_ TO~2NT02~-P__R.!l.912~_SONS.!l~.Y]\Y12~_!<~],.!I2~ I TY lJ 8 4-1'~.!l.!-1!11 N~~_.!l~-PGE.!. I N D E X ------- P a.9_~J~l_ !'~.9~Jlll. BUDGET REPORT & PROVINCIAL FUNDING 1-1-8 - !>'p~ration & !1ain..!=~~.!l~~/Dam.!.L. Cha.!lnelSi~rosiol'! CO.!l_t..E.?J._E..!=_!'.~~..!=~~ - Program Descr pt'lOn V-8 MUNICIPAL LEVIES AND BASIS OF APPORTIONMENT 11-1-3 - program Budget Summary V-9 - Erosion Control - Program Description V-lO BUDGET SUMMARY 111-1-4 --- ----------- - Program Budget Summary V-11 - Flood Control Plannil'!9. & Remedial Measures THE FINANCE & ADMINISTRATION DIVISION --------------------- --~prog~aRlDescriptlon V-12 -~-~V1-S1on Descrlption-~Goal~Responsibilities IV-l - Program Budget Summary V-13 - 1983 Achievements - 1984 priorities IV-2 - Division Budget Summary IV-3 Waterfront - program Budget Summary V-14 - Administration - program Description IV-4 ---- P r .?.9..E~E'_!<~E'J._nJ_s..!=..E~_tJ. 0 n --------- - program Budget Summary IV-5 - Program Description V-IS - gen~..E~J._.!l~.p~.!l~~ - Program Description IV-6 - Program Budget Summary V-16 - Program Budget Summary IV-7 - !-~.!t~_2.!l..!=~..EJ..?_!l_a..t~E~ r o.!l t De v e 12P.me n t - pr.?.P~..E..!=L_!<~~~J...!=J..?.!lJ Ma i n..!=!:.!'~ffil:{-~.9~E'~.!l~ - Program Description V-17 - program Descr p on IV-8 - program Budget Summary V-18 - Program Budget Summary IV-9 ...... THE CONSERVATION LAND MANAGEMENT DIVISION -~vlS1o-nDescrl(>tllcln~-Goa~Responsibilities VI-l - 1983 Achievements - 1984 priorities VI-2 THE WATER RESOURCE DIVISION - Division Budget Summary VI-3 -~-DlvlS101rlDescr1Pl1on ~oals & Responsibilities V-I - pr.?.9..E~E'_~~E'JEJ.~_~~..!=J..?~ - Program Description VI-4 - 1983 Achievements - 1984 Priorities V-2 - program Budget Sum~ary VI-5 - Division Budget Summary V-3 - Watershed Recreation - !'~.?.9..E~~~dmJ..!IJ..,.;;~_a..!=J..?~ ---pranriTi-ig------ - Program Description VI-6 - Program Description V-4 - Program Budget Summary VI-7 - Program Budget Summary V-5 Development - Program Description VI-8 - Conservation Services - program Budget Summary Vl-9 ----------------~1'rogram Description V-6 Operations & Maintenance - Program Budget Summary V-7 - Program Description VI-IO - Program Budget Summary VI -11 nevenue Breakdown VI-12 . .. - 2 - !'1'~ (s) P a..9~J,;;l_ TH~_S.9NS~~.YM:1.9.!L!-ANDMl'NAGE!,EN1' D 1 .Yl~1.91L~..?.!l td-.:. - Conservation Land Ma~ement - Conservation PlannTng ---- - commu~~ Relations -,Conservation Education - Program Description VI -13 -Superv slOn;ope-rcin:ons 5r Maintenance --- - Program Budget Summary VI -14 - program Description VII -1 2 Tree Planting/Forest Management - Program Budget Summary VII-13 - Program Description VI-IS Kortright - Program Description VII-14 - Program Budget Summary VI-16 - progtam Budget Summary VII-iS Soil ErosionlSediment Control Development - Program Description VII-16 - Program Description VI-17 - Program Budget Summary VII-17 - Rrogram Budget Summary VI-18 Fish/Wildlife Management - Program Description VI-19 THE HISTORICAL SITES DIVISION - Program Budget Summary VI-20 ---1>lVlSTc;il Deacrli:jrIon -- Goals & Responsibi Ii t iea VlI1-1 - 1983 Achievements - 1984 priorities VIII-2 - Division Budget Summary VII1-3 - !'~..?..9~1'~_~~~nis_~1'~~~ - program Description VII 1-4 - Program Budget Summary VIII-5 - ~1-eration & Maintenance - Black Creek ~_..?_~~_~11a..9_~------ - ~rogram Description VIII-6 TilE INFORMATION & EDUCATION DIVISION - Program Budget Summary VI 11-7 -~-1>lV1~C>>\1>e!scriptlon - Goals & Responsibilities VI1-l - !l2~~1'J:j..?.!l_.!'~..?..9. r am - Program Description VII 1-8 - 1983 Achievements - 1984 priorities VII-2 - Program Budget Summary VIII-9 - Division Budget Summary VII-3 - -~~..Lt1'D~Y~ 1 oJl~~.!l_t: - program Description VIII-10 - pr..?..9~1'~22.!!!.!.!lE_~1'J: i on - Program Budget Summary Vlll-ll - Program Description VII-4 - Visitors Centre - Program Description VIII-12 - Program Budget Summary VII-5 ---------------- - Program Budget Summary VI 11-13 - Communit~ Relations - Information -Geileral ---- - Program 1>escrIption VII-6 VEHICLE AND EQUIPMENT FUNDS - Program Budget Summary VII-7 ---=-Pi-og r"2iiiloescr i pt'lo-n--- IX-I Resources Management Programs - 1984 Objectives IX-2 - Program Description VII-8 - Program Budget Summary IX-3 - Program Budget Summary VII-9 Planning/Marketing Analysis VII-I'O - Program Description FOOD SERVICE - Program Budget Summary VII-ll :.-p-rogr-aiilDesc rip t ion X-I - 1984 Objectives X-2 - Program Budget Summary X-3 . Page 1-1 . 1984 BUDGET Authority Purpose, Achievements and Objectives The Metropolitan Toronto and Region Conservation Authority adopt~d a comprehensive Watershed Plan on December 5, 1980, to establish long-range goals in nine program areas specific to the 3467 square kilometres within Authority jurisdiction The adoption of the Plan is in compliance with the direction of the Conservation Authorities Act to undertake a program designed to further the conservation, restoration, development and management of natural resources and of the Province of Ontario to study and investigate the watershed and prepare and file wi th its member municipalities and the Minister of Natural Resources, a Watershed Plan. The Watershed Plan has been filed with, and concurred in by, the Authority's member municipalites and the Director, Central Region, Ministry of Natural Resources The Authority, in the Plan, has identified the river valleys, the Lake Ontario shoreline and the headwaters of the Oak Ridges inter lobate moraine and the Niagara Escarpment as the major resources to which its programs are applied. The Watershed Plan is comprised of nine (9) interrelated program~~ The basic requirement of the Authority is to provide protection to human life and property from the hazards of flooding and erosion The Flood Control Program and three complementary programs, Erosion and Sediment Control, Storm Water Management and Conservation Land Management, establish the means to accomplish this objective and recognize the relationships between rural and urban drainage, erosion and sedimentation, and flood i ng Flood Control Program - Provides for remedial measures, land acquisition and the administration of regulatory measures to maintain flood plains unobstructed to ensure the passage of flood fl ows . Erosion and Sediment Control Program - Provides for corrective works and the administration of regulatory measures to protect life and property. Storm Water Management Program - Establishes a basis for co-operative action by the Authority and its member municipalities with respect to water management problems and the preparation of master drainage plans. Conservation Land Management Program - Promotes conservation on private and public lands by providing reforestation, habitat improvement, stream improvement and a conservation planning service. Land Acquisition Program - Provides for the acquisition of flood plain and valley lands, waterfront lands and environmentally significant lands to ensure proper conservation land management. The hectares of land acquired by the Authority are being managed to achieve the objectives of the Watershed Plan Lake Ontario Waterfront Development Program - This program has two components, Shoreline Management to reduce the hazards of flOOding and erosion at the land/lake interface, and Development to create water-oriented recreation opportunities 19B3 09~19 Page 1-2 Watershed Recreation Program - Enables the development and operations of recreation areas for public use and enjoyment, a valuable ancillary benefit on conservation lands Heritage Conservation Program - Recognizes the special contribution that a~ historical perspective gives to the understanding of r~source management. Community Relations Program - Establishes the means by which the Authority can communicate with the community in order to gain understanding and acceptance of its conservation programs. The 1984 Budget Estimates derive from the Watershed Plan reflectiog a strong orientation to Water and Related Land Management Programs and emphasizing planning, regulatory and environmentally acceptable solutions to water management problems. The Budget proposals also address a number of administrative matters - disposition of municipal levies on hand - provision for gapping, set at 1% of full-time wages, salaries and benefits - identification and allocation of interest income The adoption of this Budget will not enable the Author i ty to maintain the level of service provided to the community in 1983 and will not enable the Watershed Plan objectives to be implemented at the rate anticipated on adoption. Format of Presentation The 1984 Budget Estimates are based on the same program management format as the 1983 budget forma t. The format is designed to identify more clearly the programs adopted by the Authori ty in its Watershed Plan. In addition, the budget estimates are organized into management units to more clearly iden~ify and manage the Authority programs. The principles of program budget management have been used to develop the Budget. There are five major types of provincial grants available through the Ministry of Natural Resources to Conservation Authori ties 1 Administration . 2. Water and Related Land Management 3 Conservation and Recreation Land Management 4 Speci a 1 Projects and Programs 5 Supplementary Grants (not applicable to MTRCA) Commencing in the 1983 budget year, the Ministry of Natural Resources recommends the payment of grants to authorities based on a priority ranking system, using technical criteria, which compares the 'need' for individual projects in a province-wide matrix . 1983 09.19 Page 1-3 Authority Programs 1 Finance and Administration (a) Program Administration (b) General Expense (c) Property Acquisition, Maintenance and Management 2. Water Resource (a) Program Administration (b) Conservation Services (c) Erosion and Sediment Control (including Lake Ontario's Shoreline Management Program) (d) Flood Control - Planning and Remedial Measures - River Forecasting Operations - Maintenance - Small Dams, Channels and Erosion Control Sites (e) Program Administration - Waterfront ( f) Waterfront Development .. 3 Conservation Land Management (a) Program Administration (b) Watershed Recreation - Planning - Conservation Area Development - Operations and Maintenance (c) Conservation Land Management - Planning - Tree Planting/Forest Management - Soil Erosion and Sediment Control - Fish and Wildlife Management . . 1983 09 19 Page 1-4 5. Information and Education (a) Program Administration (b) Community Relations - Information - General - Resource Management - Planning, Market Analysis - Conservation Education - Sup~rvision, Operations, Maintenance - Supervision, Operations, Maintenance (Kortright) (c) Conservation Education Development 6 Historical Sites (a) Program Administration (b) Operations and Maintenance (c) Capital Development The municipal share of expenditures on administration, operations and maintenance, and current programs comprise the Authority's General Levy on all participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario. The municipal share of expenditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in specific projects. Certain expenditures from special revenues and levy on hand are recommended Land Acquisition Project, 1982-1984 This project was adopted by the Authority and approved by the municipalities on the basis of a 55% grant and all member municigalities benefiting in proportion to their equalized assess~ent The Authority plans an expenditure of $650,000 for 1984, of which $292,500, being the municipal share, wi 11 be funded from levy monies on hand Lake Ontario Waterfront Development Project, 1984 This project will be subm i t ted for approval on the basis of a 50% grant and all member municipalities benefiting in the same proportion as that determined for the 1977-1981 project. The budget estimates for this project are found in the Finance and Administration (WaterfrQnt Open Space Land Acquisition and Hazard Land Acquisition) and the Water Resource Division sections of the budget document. . 1983 09 19 Page 1-5 Projects for Erosion Control and Slope Stabilization in the Municipality of Metropolitan Toronto and Hie Reg i ona 1 Municipalities of Peel, York and Durham, 1982-1984 These projects were adopted by the Authority and approved by the municipalities on the basis of a 55% grant and each municipality benefiting for the works carried out in the municipality. The 1984 municipal funding requirement is Metropolitan Toronto $ 180,000 Peel 6,750 york 9,000 Durham 2,250 $ 198,000 These projects are budgeted for in 1984 as submitted The 1984 Levy The apportionment of the 1984 general levy is based on the 'discounted' equalized assessment in the Authority, in accordance with information supplied to all Conservation Authorities by ~he Province of Ontario (Ministry of Municipal Affairs and Housing) . In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied an amount equal to 100% of the 1983 taxes paid by the Authority for revenue producing conservation areas within those municipali ties Within Metropolitan Toronto, Authority lands are not subject to taxation. provincial Funding The provincial grant structure used in the budget is based on the following approved percentages: Admini stra tion 50% Water and Related Land Management (includes Shoreline Management) 55% Conservation and Recreation Land Management (includes Waterfront Development) 50% 1983 09 19 . Page 1-6 The Authority will seek approval for the following level of funding from the Province of Ontario to finance the programs-set forth in the 1984 Budget Rate Reques~ed Approved Approved of Grant 1984 1984 1983 % -r- $ $ ADMINISTRATION A 1 to A6 inclusive 50 751,655 690,000 ------- ------- ------- ------- WATER & RELATED LAND MANAGEMENT PROGRAM ADMINISTRATION WI Flood Control - Wages, benefits & expenses 55 579,085 400,900 W2 Operation and maintenance of water control 55 117,562 200,000 W3 Conservation services 55 130,000 W4 Community Relations 55 101,380 99,000 W5 Taxes and Insurance 55 147,950 151,000 W6 General Expenses 55 W7 Urban/Rural Drainage 55 25,850 11,000 we Forest Management/Reforestation 55 73,425 31,525 W9 Soil Erosion & Sedimentation 55 62,425 SUB TOTAL 1,107,677 1,023,425 SURVEYS & STUDIES Preliminary engineering 55 66,000 Environmental studies (E C.) 55 22,000 SUB TOTAL .!!8,000 1983 09 19 . Page 1-7 Rate Requested Approved Approved of Grant 1984 1984 1983 % $ $ $ WATER & RELATED LAND MANAGEMENT (contd.) CAPITAL Flood Control Bolton remedial work 55 530,100 Hazard Land Acquisiton 55 357,500 150,000 , Pickering/Ajax remedial 55 192,500 Keating Channel 55 233,750 Goodwood Pumping station 55 . 96,250 Major Maintenanceland acquisition 55 23,925 Flood warning equipment 55 5,500 Flood plain mapping 55 120,000 SUB-TOTAL 1,029,425 680,100 Erosion Control Highland Creek 55 297,000 82,500 Bellamy Road 55 852,500 Shoreline Management 55 335,500 270,000 Waterfront hazard land acquisition 55 66,000 Major maintenance 55 107,250 Metro Erosion Control 55 220,000 179,575 Peel Erosion Control 55 8,250 10,000 York Erosion Control 55 11,000 4,950 Durham Erosion Control 55 2,750 SUB-TOTAL 1,900,250 547,025 TOTAL WATER AND RELATED LAND MANAGEMENT 4,125,352 2,250,550 --------- ==:::::z====== --------- 1983 09.19 . Page l.:..!!. Rate Requested Approved Approved of Grant 1984 1984 1983 ----,---- ----$--- ---T- ----T-- CONSERVATION & RECREATION LAND MANAGEMENT ----------------------------------------- PROGRAM ADMINISTRATION ---------------------- C1 Salaries, wages & expenses * 50 877 , 550 750,000 C2 Conservation services 50 C3 Information and int~rpretation 50 30,400 28,140 C4 Taxes and insurance 50 34,650 40,460 C5 General expenses 50 C6 Fish & Wildlife 50 15,500 C7 Forest management 50 ___Jl..!!.1 550 ------- SUB-TOTAL b~Jj_L~J.Q !lJ.JlJ.ii~~_ SURVEYS AND STUDIES ------------------- Boyd Master Plan 50 17,500 37,500 C1aireville study 50 17 ,500 Conservation Area master plans 50 ~]...!001.l ------ SUB TOTAL .?J...!~OO 3 7...!J~.Q CAPITAL --Outaoor Recreation -Conseria-tlon-area development SO 231,325 80,000 Kortright development 50 50,000 Waterfront open space land acquisition 50 150,000 , Waterfront development \ 50 __Jl]~ ' 000_ __jBJ~OO SUB TOTAL . .!.L.?j}L3J2 _-..1}JJ~ 0 0 TOTAL CONSERVATION & RECREATION LAND MANAGEMENT 2,359,975 1,568,100 --------- --------- --------- --------- TOTAL FUNDING 7,236,982 4,508,650 --------- --------- --------- --------- * includes administration budgets for Waterfront Development, Conservation Land Management, Information and Education and Historical Sites 1983.09 19 Page II-I TIlE METROPOLITAN TORONTO AND REXiION CONSERVATION AlJI'HORITY --- ----------------------------------------------------------- BASIS OF APPORTIOtfoIEllT - MUNICIPAL LEVY - 1984 BASED ON TIlE LATESI' EQUALIzEi)1iSsESS1ENT-PIGURES (DISCOONi'ED}AVAIIADLE TO THE Al1I'HORITY" ---DTscounted ----------"%Of---- Discounted EqualizJ-- Population Equalized Municipali ty Assessment Total In ___..!!.J..r.1icipal i..!:.i'____________ ~sessmen~-- _.!!l-M..!:hori..!:.i'____ -,-.!.!l_~~~~~ __ Po~lation A~..!:hor i ty_____ ,uOO's of o;>S J.,OOO S o~ 0;> s Adjala Township 64,667 8 5,173 3,899 312 Durham, Regional Municipality of 1,277,001 * 1,002,050 75,909 61,103 Metropolitan Toronto 48,114,479 100 48,114,479 2,140,347 2,140,347 Mono Township 91,590 5 4,580 4,126 206 Peel, Regional Municipality of 11,639,388 * 4,923,577 506,421 219,462 York, Regional Municipality of -- 6~:~ft:~}-- --------.-:.--- --5~2~~i~~~~ --- --"2,~~~~6 2,~~~~~~: ---- ___________________ ______________ __________ __::::J____________ __ ______ ANALYSIS OF REXiIONAL MUNICIPALITIES * ---------------- Durham, Regional Municipality of Ajax Town 422,170 86 363,067 25,660 22,068 pickering Town 627,060 95 595,707 38,799 36,859 Uxbridge Town 227,771 19 43,276 11,450 2,176 _________________ -=1,277,001 ------===--= =--1,0.!l2,0.?0 ==- __-121909 - -==--=~J,10} = Peel, Regional Municipality of Brampton, City of 3,144,226 63 1,980,863 154,981 97,638 Mississauga, City of 7,861,929 33 2,594,436 324,853 107,201 Caledon Town 633,233 55 348,278 26,587 14,623 ____________ -=1T;639,388_=- -=--======--==== =___~.!J23,577 ___ ---- 506 ill ==J19,462 ==--= York, Regional Municipality of Aurora Town 329,525 4 13,181 16,466 659 Markham Town 2,403,017 100 2,403,017 81,932 81,932 Richnord lIill Town 931,483 99 922,168 38,488 38,103 Vaughan Town 1,621,307 100 1,621,307 36,815 36,815 Whitchurch-Stouffvil1e Town 332,271 43 142,877 13,551 5,827 King Township ___ 409,255 ___ _______~_______ ____~.!t161.-- __~284 _ ____-,~878 __ __________ ___ 6,02~,858 __ ______________ _____.?.!}~~.!]J.?____ ______ 20",536 .:~21.!..-_ ** As provided by the Ministry of Municipal Affairs and Housing for the 1983 fiscal year The equalized assessment data for the 1984 budget will be made available in early 1984 , 1983.09 19 . 'lHE METROPOLITAN TORONl'O AND ,RmION CONSER~TION AIJI'HORITY Page II -2 1984 LEVY APPORTIONMENT USING DISCOONTED muALIZED ASS~T. General aoo Capital Levy waterfront Project excluding waterfront Discounted Assessment Discounted Assessment Proportionate 95% Metrojburham Proportionate in Watershed Factor 5% Ad~ala/Mono/peel/York Factor' (1,000'5 of $'5) ( ,000'5 of $'s) Adjala 5,173 00008718064 5,173 .00002530811 Durham Ajax 363,067 Pickering 595,707 Uxbridge 43,276 1,002,050 1,002,050 .01688756078 1,002,050 .01938140825 Metro 48,114,479 .81087389710 48,114,479 .93061859175 Mono 4,580 00007718679 4,580 .00002240695 Peel Brampton 1,980,863 Mississauga 2,594,436 Caledon 348,278 4,923,577 4,923,577 08297710279 4,923,577 02408784403 York Aurora 13,181 Markham 2,403,017 Rictarooo Hill 922,168 Vaughan 1,621,307 Whitchurch-Stouffvi11e 142,877 King 184,165 5,286, 715 5,286,715 08909707190 5,286,715 .02586444091 59,336,574 1 00000000000 59,336,574 1.00000000000 . As provided by the Ministry of Municipal Affairs and Housing for the 1983 fiscal year The equalized assessment data for the 1984 budget will be made available in early 1984 1983 09.19 Page .!1:1 THE METROroLITl\N TORONTO AND REGION CONSERVATION AlJI'HORITY AProRTIONMDIT OF 1984 LEVIES rnNERAL PROJECTS - WATERSHED PLAN PROJECI'S - WATERFRONT ----------------------------- 198 4 GENERAL LEV Y WATERSHED PROJECTS WATERFRONT SPECIAL Before Tax Total Inc 1983 General Inc Capi tal Capi tal Highland Keating Bellamy Shoreline ~_ ~just __!djusbnent Tax Mjust _1'~ Adjss~nt_ All Ben. Ben .Mull . Total Creek Channel Road !?eve~.!l.!: ~.!13t~.!1.!: $ $ -r----r----r-" --~-" ----r- --r- Adjala 459 459 348 25 25 23 (c) Durham 88,985 44,117 133,102 108,868 4,940 238,500 243,440 17 ,288 Metro 'l'oronto 4,272,708 4,272,708 3,236,427 237,181 180,000 417,181 243,000 191,250 697,500 830,112 328,500 Mono 407 407" 308 22 22 20 Peel 437,228 108,404 545,632 429,936 24,271 6,750 31,021 21,486 York 469,476 32,627 502,103 383,686 26,061 9,000 35,061 23,071 -5,269-;26T~85,1~ 5,454,411 4;159;5'73 292,500 434,250 - 726,750 243,000 -191,250 6 7,500 T~117,000---- 328,500" (a) (b) ------------------ _E.2~ 500)___ (292 500) ----------- _<1~..900)________ 5,269,263 185,148 5,454,411 4,159,573 -- 434,250 434,250 243,000 191,250 697,500 892,000 328,500 ================================================================================================================================================= OOTES (a) $292,500 of the 1983 capital surplus has been credited to the 1984 Watershed projects, capital all benefiting municipalities. (b) $225,000 of the 1983 capital surplus has been credited to the 1984 Waterfront Development (capital) all benefiting municipalities (c) Includes $2,250 as part of the Erosion COntrol and Slope Stabilization Project, 1982-84, as well as $157,500 for completion of protection works on the Duffin Creek in Pickering and Ajax, and $78,750 for the replacement of the Goodwood Pumping Station 1983 09 19 Page 111-1 LEGEND: Current Items - II Capital Items - 00 \ BWGET SUl11ARY - 1984 l!\ 1984 BUDGET OOURCES OF FlNAOCING 1983 BlDGET 1983 ACl'UALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDlTURFS REVENUES EXPENDITURES GRANT IEVY OTHER EXPaJOI'l\JRES REVENUES EXPENDITURES REVENUES $ ~ $ $ $ $ $ $ ~ $ FlNAOCE & ADMINISTRATION Administration II 1,513,310 1,513,310 751,655 751,655 10,000 1,380,000 General Expenses " 296,500 198,000 98,500 38 ,500 60 ,000 265,000 172,000 property Acquisition, Maintenance & Management Flood Control Hazard Land Acquisition 00 550,000 550,000 302,500 247,500 550,000 Recharge;t>ischarge Areas 00 100,000 100,000 55,000 45,000 Waterfront Hazard Land AcquIsitIon 00 120,000 120,000 66,000 54,000 325,000 Waterfront Open Space Land Acqu' n 00 300,000 300,000 150,000 150 ,000 300,000 Legal Costs Regulation Enforcement #I 12,000 12,000 6,600 5,400 11,000 Water & Related Taxes II 258,000 258,000 141,900 116,100 260,245 Insurance II 11,000 11 , 000 6,050 4,950 14,300 Conservation & Recreation Taxes II 58,300 58,300 29,150 29 , 150 67,200 Insurance II 11,000 11,000 5,500 5,500 13,720 1983.09 19 Page .!..Il:~ BrnGET SUl>Y-\ARY - 1984 ----------------------------- -------------------------------------- ---------------------------------- ---------------------- --------------------- 1984 BUDGET SOURCES OF FINlIOCING 1983 BUDGET 1983 ACTUALS ACTIVITY ------------ ------------ ----~---- PROvm:::iAL --"MUNICiPAL --- -------- -------- ----------- ------ EXPENDITURES REVENUES EXPENDITURE rnANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ----------------------------- -----V---- ---~----- ---V---- -----..~r---- ----.:~r----- ---"$--- -----v---- "$---- -----"$--- --"$---- WATER RESOURCE ----------- Program Administration Ii 1,073,381 1,073,381 5~,485 486,396 14,500 861,186 Conservation Services Ii 112,000 112,000 61,600 50 , 400 20,000 operation & Maintenance - Water Control Structures il 213,750 213,750 117,562 96,188 153,414 Erosion Control - HighlarrlCl:eek 00 540,000 540,000 297,000 243,000 150,000 Bellamy Road 00 1,550,000 1,550,000 852,500 697,500 Shoreline Management 00 610,000 610,000 335 ,~OO 274,500 582, 500 Major Maintenance Dt 195,000 195,000 107,250 87,750 Studies II 40,000 40,000 22,000 18,000 Metro 00 402,000 2,000 400,000 220,009 180,000 396,500 11,500 Peel 00 18,000 3,000 15,000 8,250 6,750 35,600 5,600 York 00 20,000 20,000 11,000 9,000 23,500 3,500 Durham 00 5,000 5,000 2,750 2,250 5,000 Flood Control - pi~iiira~--- U 473,500 473,500 215,425 108,075 150,000 53,000 RaneE a 1 00 1,000,000 1,000,000 522,500 427,500 50,000 1,283,000 Waterfront Adiii'rn1"5trati on 00 269,000 269,000 132,000 137,000 211,239 Developrent 00 1,810,000 150,000 1,660,000 830,000 605,000 225,000 1,531,261 150,000 CXlNSERVATION LAND -------MA~GEMENT -------- Program ~ninistration Dt 804,711 804,711 402,356 402,355 673,204 , 1983 09.19 . Page 1]}:1 BUDGET SUMMARY - 1984 ----------------------------- ------------------------------------ ---------------------------------- ---------------------- ---------------------- 1984 BUDGET OOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS lICTIVITY ------- -------- --~----- - PROVlOCIAL -MUNiCIPAL ---- --- - --- ------- EXPENDI TURES REVENUES EXPENDITURES rnANl' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ---------------------------- ---$-- ---$'--- ----S--- -----S-- ---S----- --S ---S-- -S-- ---$--- --S-- Watershed Recreation --------------------- , Planning II 104,000 104,000 52,000 52,000 75,000 Developnent Ii 462,650 462,650 231,325 231,325 181,960 Operations tI 2,511,600 1,127,000 1,384,600 1,384,600 2,180,000 1,016,000 Conservation Land Managenent tJ 539,500 165,500 374,000 204,150 169,850 438,181 134,000 INFORMA'rION & EDOCATION ---------------- Program Administration U 345,130 345,130 172,565 172,565 315,420 . ~l!1!!:Y_ Re}ati.9~__f.!1fo_r.!!l_ Support " 65,475 65,475 32,738 32,737 64,842 General If 84,127 84,127 45,270 38,857 80,127 Resource M;jt Prog ran s Ii 11 ,000 11,000 6,050 4,950 11,000 Planning/Market Analysis II 94,743 94,743 94,743 90,243 COl1lll!1 i ty_~!!.!-~ t i.9.!1.:>_ e:l~.!!. Support Ii 35,982 35,982 17,991 17,991 35,108 Supervision Operation & Maintenance " 1,261,560 1,119,500 142,060 60,060 82,000 1,273,083 1,136,300 Supervision Operation & Maintenance - Kortright it 478,600 286,500 192,100 20,400 137,500 34 , 200 442,000 264,850 Developnent II 191,000 191,000 50,000 50 ,000 91,000 114,800 1983 09 19 Page .!Y:.! BUDGET SUMMARY I ------------------------- -------------------------------------- --------------------------------- ---------------------- -------------------- . 1984 BUDGET . SOURCES OF FINAOCIOO 1983 BUDGET 1983 AcruALS ACTIVITY ------- ---- --tiET---- PROVlOCIAL - MUNICIPAL - ------ ----- ---------- ------- EXPENDITURES REVENUES EXPENDITURES rnANt LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES -------~------ -r- --$""'- --~-- ~7r-'--- ---r-- --S-- -----$ $ ---r-- $'---- HISTORICAl, SITES ------------ Program Administration " 239,800 239,800 119,900 119,900 273,122 Operations & Maintenance *' 1,851,200 1,009,500 841,700 631,700 210,000 1,487,200 1,025,000 Educational Programs U 142,674 148,750 (6,076) (6,076) 157,500 163,500 Capital Development 00 1,868,000 1,868,000 1,868,000 1,995,000 Visitors Centre U 67,500 42,700 24,800 24,800 ~HIfLE &,~JI.!'~NT ~ #i 316,925 316,925 14 , 550 302,375 280,730 ----------------------------- ----------- ------ ---------- ---------- ------------ --- --- --------- ------- OJRRENr 5,454,411 CAPITAL 2,786,500 ----------------------------- ----- --------- ------ --------- ----------- ------- --------- - ---- ----- 1984 TOTAL 23,037,918 4,252,450 18,785,468 7,236,982 8,240,911 3,307,575 18,591,374 4,082,250 1983 TOTAL* 18,591,374* 4,082,250 14,509,124 4,426,150 5,779,698 4,303,276 -------------------------- ------ --------- --------- ----------- ---------- ------- ------ ---- ------------ ---------- * This total excludes $2,123,808 of funding made available under the C.O.E.D. program for 1983. 1983 09 28 Page IV-l 1984 BUDGET THE FINANCE AND ADMINISTRATION DIVISION To support goals of the Authority, the responsibilities of the Division encompass financial management and monitoring of financial procedures, compilation of budget, multi-year forecast and provision of financial data and reporting as required The Division is responsible for acquisitions and management of property, management of Authority legal services, managemen~ of Authority's administration offices and grounds, and provision of administrative services to all divisions of the Authority and management of Authority personnel services The Secretary-Treasurer is required to record the resolutions, decisions and other proceedings of the Authority and to keep the originals of all minutes of the Authority and its .boards and committees. 1983.09.19 , . , Page IV-2 1984 BUDGET 1983 ACHIEVEMENTS - Continued development and streamlining of computer based financial management and budget reporting systems - Initiated internal audit procedures for cash and inventory control. - Provided increased level of support as a result of the C 0 E D and Food Services Program - Responded to Auditor's Memorandum of Recommendations and implemented many of its recommendations on strengthening internal control. - Finalized amendments to Authority's purchasing policy (planned for November 1983) . , 1984 PRIORITIES - To continue . to provide an improved level of services within the ava Hable resources. - To strengthen the system of internal audit procedures commenced in 1983 - To continue to improve on the financial management and budget reporting systems 1983 09 19 . Page )V-l. 1984 BIlDGE'l' DIVISION: Finance & Administration ---------------~-------------------- ----------------- ---------~---------- ------~--------_.._--------- ----------------- ------------------ 1984 BUDGET OOURCF,s OF FlNAN::ltoK; 1983 BUDGET 1983 ACWALS PROGRAM ------------. NET -- PROVlocIA1:-- --MiJNICIPAL- ---- ------- ----- ----- ------- EXPrnDITURES REVENUES EXPENDITURES GRANT LEVY arHER EXPENDITURES REVENUES EXPENDITURES REVENUES ----------------- ---r---- --r-- -------"$----- ----"$------ -------$----- ---$---- ----$ --r- -----$--- ---S-- Program Administration 1,513,310 1,513,310 751,655 751,655 10,000 1,380,000 I General Expenses 296,500 198,000 98,500 38,500 60,000 265,000 172,000 . Property Acquisition, Maintenance & Mana<]Ement 1,420,300 1,420,300 762,700 365,100 292 , 500 1,541,465 . ----------------- -------- -------- -------- ------------ ---------- --------- ------------- ----- ----------- --------- 'f(YI' AL _ 3, 230,JJE___ _J98JEEE_ -1..!031..!JJ~_ _J..! 51~..!}.?.?___ _lLl.?.?..!.?:?.?__ __}62..!50~ _}, 18..?..!..!?.?__ _J]2,EEE_ ----------------- ---------- ------ , 1983.09 19 Page IV-4 1984 BUDGET DIVISION Finance and Administration ------------------------------------~ PROGRAM Administration ------------------------ PURPOSE ------- To provide the administrative and financial services of the Authori ty 1984 OBJECTIVES ----------------. Continuation of general administration and financial support services for all Authority programs, as well as expenses for Authority members The salaries of the General Manager, Deputy General Manager, Secretary- Treasurer, associated secretarial staff, and the staff of the Finance and Administration Division, which includes Land Acquisition, Personnel, Finance and general office administration, are charged to this program The payment of members' per diem and kilometers and Authori ty meeting expenses are included in the budge t The cleaning and maintenance of the administration headquarters is also funded FUNDING -----~ This is a shared program, financed by a grant from the Province of Ontario and the general levy on all part icipat i ng municipali ties FINANCIAL COMMENTS ------------------- In 1984, as in ]983, employee benefits and Administrators' salaries are charged to each program Salary increases are provided for on the basis of 5% p.conomic adjustment OBJECTIVE CLASSIFICATIONS Members Equipment -------------------------- Salarieg Fringe Salaries Material, Supplies Services Purchase & . ~!l3lges_. Benefits ~_ ~2'''p_e.!.~~ & Utilities & Rents Rental TOTAL -------- ------------------- --------- ---------- $ 756,940 124,600 108,850 334,000 130,920 58,000 1,513,310 1983.09.19 Page IV-5 1984 BUDGET DIVISION Finance and Administration Program Administration -------------------------------------- ----------------- ---------------------------------------- ------------------------------------ ------------ ----------------------- 1984 BUDGET SOURCES OF FINAlCING 1983 BlDGET 1983 ACTUI\.LS -------------- - ---NET-- PRovlOCiA1.- -~IcipA1.-- ------- -------- ---- ----------- ----------. ACTIVITY EXPENDITURES REVENUES EXPENDITURES GRANT LEVY O'rIlER EXPENDITURES REVENUES EXPENDI'mRES REVENUES ----------------- --S-- $ -----S---- -----S-- ----S---- --"$"-- ----S---- ----"$"- ---S---- --$----- Wages & Benefits 881,540 881,540 440,770 ,440,770 747,680 Travel Expense & Allowal)ces Regular 21,500 21,500 10,750 10,750 20,600 ~bers 91,350 91,350 45,675 45,675 76,670 Equipnent Purchase & Rental 58,000 58,000 29,000 29,000 73,500 Materials & Supplies i39,000 139,000 64,500 64 , 500 10,000 121,000 Rent & Utilities 195,000 195,000 97,500 97,500 247,550 General Expenses Regular 109,420 109,420 54,710 54,710 75,500 ~bers 17,500 17,500 8,750 8,750 17 , 500 ----------------- ------- ----- ------------ ----------- ----------- --------- --------- ----- -~-------- -------- roTAL _l.! 51.i! 31~__ l.!~ 13 .!}.!Q... ___ 75l.!65~__ ____J5 ~.?~~__ __l~.! OO.Q.. 1.t3110 , ~~.Q.. --------- --------- ----------------- -------- ----- 1983 09 19 . Page IV-6 1984 BUDGET DIVISION Finance and Administration PROGRAM General Expenses PURPOSE To provide for a variety of support costs for which no provincial grant is available. 1984 OBJECTIVES To continue to fund repairs and maintenance of rental properties and other general maintenance. To continue to fund taxes and insurance on rental properties To continue to fund the public liability insurance on vehicles and equipment. To continue to fund the provision of adequate level of service at Authority and staff meetings and functions FUNDING Since no provision for these items is made in the Ministry of Natural Resources grant structure, the funding is entirely from municipal levy and program revenues consisting of rental and i?lterest income FINANCIAL COMMENTS In 1984, as in 1983, net interest income is credited to the member municipalities' general levy OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services Interest & Wages utilities & Rents Costs Insurance Taxes TOTAL $ 12,000 26,000 98,000 25,000 22,500 113,000 296,500 1983 09 19 Page }V- 2. 1984 BUDGET DIVISION Finance and Administration Program: General Expenses ------------------------------------- ----------------- ---------------------------------------- -------------------------------------- ----------------- ----------------------- 1984 BUDGET SOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS ACTIVITY ----- ------- -----1mT---- --PROVIOCIAL-- --iiiNlcu'A1-- ------- ------ ---- ----------- ---------- EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPEND ITURES REVENUES EXPENDITURES REVENUES ----------------- --r----- --""T--- -----$------ ------$---- ----$---- ---$--- ---$"------ --$---- --$----- --$--- Authority & Staff Meetings and Functions 45,000 45,000 45,000 30,000 Vehicles & Equipt Expenses 5,000 5,000 5,000 5,000 Staff & Authority tanbers Long Service & Retirenent 6,000 6,000 6,000 6,000 Insurance 12,500 12,500 12,500 16,000 Miscellaneous 5,000 5,000 5,000 6,000 ~!:!,lta1--.!'!.9~}}j~~ 80,000 80,000 60,000 MaIntenance Realty Taxes 113,000 113,000 105,000 Insurance 5,000 5,000 7,000 Rental Iocane 198,000 (198,000) 172,000 Interest 25,000 25,000 (35,000) 60,000 30,000 ----------------- ---------- ------- ----------- ------------- -------------- --------- ---------- ------ ---------- ---------- 'lUl'AL ___ 296,~EE__ _..!-J.!l ,OO.Q.._ ___J.!l.!~EE-_ _____}8,~EE__ ___~E.tEEE_ ___}~~.! 000___ ..!-.?}.!.!l.!l.!l__ ------- ----------------- ------------ ------- 1983 09 19 Page IV-8 1984 BUDGET DIVISION Finance and Administration PROGRAM Property Acquisition, Maintenance & Management . PURPOSE . To fund the acquisition of lands required in carrying out various programs of the Authority . To provide for costs associated with taxes on non-revenue producing areas and liabi li ty insu~ance on Authority lands unde~ Water and Related Land Management Programs and Conservation and Recreation Land Management programs. To provide for legal costs associated with the Authority's regulation enfo~cement 1984 OBJECTIVES . The acquisition of lands and p~operty interest , - to facilitate construction of the proposed pickering/Ajax Dyke and Flood Control Works at German Mills Creek; - at flood vulnerable and prio~ity valley land locations; - to facilitate e~osion control works including the purchase of endangered residences along Scarbo~ough Bluffs; To acquire - key properties along the Lake Ontario Shoreline; - environmentally significant areas in the Headwaters of the Wateished FUNDING: The funding for this program is on a shared basis with 55% (Water and Related Land Management Programs) and 50% (Conservation and Recreation Land Management Program) of the funds being available from the province of Ontario and the balance being funded by general, capital or Wate~front Plan levy on all participating or benefiting municipalities FINANCIAL COMMENTS The funding for realty taxes does not make allowances for any market value assessment that may be implemented in 1984. OBJECTIVE CLASSIFICATIONS Mate~ials Salaries Supplies & Real Services & Wages Utilities Property & Re41 ts Taxes Insurance TOTAL $ 1,070,000 12,000 316 I 300 22,000 1,420,300 1983.09 19 . 1984 ~rnGET Page }.y..:-2. DIVISION: Finance and Administration Program: Property Acquisition, Maintenance & Managenent --------------------------------------- --------- --------------------- ---------------------------------- ----------- --------------------- 1984 BUDGET OOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS ACTIVITY - ---NET ---- - PROVIOCIAL-- - MUNICIPAL -------- ----------- -------- ---------- ---------- EXPEND ITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ---------------- ---S--- -$--- --$----- ----$----- ----S--- --$---- ----$-- $ -$--- ---$--- Flood Control LarrlAcqu1sTEion 550,000 550,000 302,500 247,500* 550,000 Flood Control RechargeY- discharge areas 100,000 100,000 55,000 45,000* Waterfront Hazard r.aooAcqu1S11:lOn- 120,000 120,000 66,000 54 ,000 325,000 Waterfront o~n Space Land Acquisition 300,000 300,000 150,000 150,000 300,000 ~~i-.f~E}~ Regu atlOn Enforcenent 12,000 12,000 6,600 5,400 11,000 Water & Related Taxes--------- 258,000 258,000 141,900 116 , 100 260,245 Insurance 11,000 ll,OOO 6,050 4,950 14 , 300 Conservation & .. Recreation Taxes ----- 58,300 58,300 29,150 29,150 67,200 Insurance ___}..!-,OOO__ ___..!-1,.!l00___ ______~.!~E.Q.._ ______~.!~OO__ ____}1I]}.Q..__ ----------------- ------ -------- ---- --------- ------- 'lUl' AL 1 420,300 1,420,300 ___]~}.t.?00 _ 365,100 292,500 1..!54l,46~ ------ -M.mic1pal share unded fran lelT1eson harrl -------- ------------- -------- ------ --------- 1983 09 19 Page V-l 1984 BUDGET THE WATER RESOURCE DIVISION ---~-------------~ This Division is responsible for the carrying out of the approved water management policies and programs of the Authority, as they apply to the river systems and the Lake Ontario Waterfront, including - administration of the Flood Control Program; - administration of the Authority's Erosion and Sediment Control Program, including the Lake Ontario Shoreline; - administration of the Storm Water Management Program; - administration of the Waterfront Development Program; - the development and operation of a Flood Warning System; - technical advice and direction concerning the enforcement of the Authority's fill regulations and development control; - the administration of the Authority's plan review function related to the Authority's fill and construction regulations in co-operation with the member municipalities and the Province of Ontario; - long range planning and policy development related to Divisional responsibilities; - environmental monitoring and review of flood control and waterfront projects; 1983.09 19 Page V-2 1984 BUDGET --- 1983 ACHIEVEMENTS - Continued flood control remedial measures at Bolton and maintained existing flood control structures and channels - Operated and maintained flood control dams and Flood Warning and Flood Forecasting system - Provided protection from erosion and slope instability at priority sites in Metropolitan To~onto, Peel, York, Durham and along the Lake Ontario shoreline; completed Phase I of the Highland Creek remedial measures - Commenced preparation of Master Drainage Plans - Participated in municipal plan input and review process, including regulation administration - Commenced work at Colonel Samuel Smith and East Point Waterfront Areas. - Completed servicing and site stabilization at Bluffers Park 1984 PRIORITIES - Complete flood control remedial measures at Bolton and on Duffin Creek (Pickering/Ajax) - Commence dredging of the Keating Channel - Prepare flood plain mapping of headwaters areas - Continue the preparation of Master Drainage Plans and implement soil erosion and sediment control program. - Operate and maintain existing erosion and flood control works, including dams and the Flood Warning and Flood Forecasting System; replace the Goodwood Pumping Station - Carry out erosion control works on a priority basis in Metropolitan Toronto, Peel, York and Durham and along the Lake Ontario shoreline; continue works on the Highland Creek; commence Phase I of the Bellamy Road Ravine Project. - Continue development at Colonel Samuel Smith, East Point, Ajax and Bluffers Phase II Waterfront Areas - Complete development at Humber Bay West , 1983 09.20 , Page Y.-l 1984 BlDGET DIVISION Water ReOOurce ---~- ----- ----- ------------------------- 1984 BlDGET OOURCES OF FINAN;::ING 1983 BlDGET 1983 ~~___ PROGRAM - NET PROVIOCIAL MUNICIPAL EXPEND I TURES REVENUES EXPENDITUR~ GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REWNUES -~---- --$ $-- -r- $-- $ :;; $ $ $ Program Administration 1,073,381 1,073,381 572,485 486,396 14,500 861,186 Conservation Services 112,000 112,000 61,600 50,400 20,000 Operation and Maintenance - Water Control Structures 213,750 213,750 ll7,562 96,188 153,414 Erosion Control 3,380,000 5,000 3,375,000 1,856,250 1,518,750 1,193,100 20,600 Flood Control Planning and Renedia1 Works 1,473,500 1,473,500 737,925 . 535,575 200,000 1,336,000 -------- -- - --- -- - 'lUl' AL 6,252,631 5,000 6,247 ,631__1-. 3,342.t!l~ _.b~ 87.tl.!l1.. 214,500 3,563,700 20 ,600 - - 19113 09.19 . Page V-..! 1984 BUDGE'r DIVISION Water Resource PROGRAM Program Administration PURPOSE --- To provide administrative, planning, biological and engineering staff necessary for implementing 1984 programs 1984 OBJECTIVES: - To carry out the 1984 work programs within the Flood Control, Erosion Control and Planning and Environmental categories within the funding limits. FUNDING -- This is,a shared program, 55% of the funds being available from the .province of Ontario and the balance being funded from the general levy on all participating municipalities , FINANCIAL COMMENTS ----~ OBJECTIVE CLASSIFICATIONS Materials - --- Salaries Supplies & Real Services ~ages Utili ties E9.?J.~ent Pr~erty & Rents TOTAL -- --- $ 1983 09 19 Page Y:2 1984 BllXiET DIVISION: Water Resource Program Program Administration ----- ------- - -~-- ------- 1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACI'UALS ----- PROVIOCIAL MliNICIPAL ----- ----- ACTIVITY NET ~XPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES -------~ -~ ~ ~ -$-- -- $ $ $ $ $ -$-- Salaries 778,043 778,043 427,924 350,119 649,107 Benefits 184,638 184,638 101,551 83,087 111,537 . Travel 14,700 14,700 8,085 6,615 14 ,000 Water 'l11ene Co-ordinator 29,000 29,000 - 14,500 14,500 22,242 Enforcenent Officer Travel 18,500 18,500 10, 175 8,325 17,600 Technical Maps Legal 9,500 9,500 5,225 4,275 9,000 Data Processing 5,500 5,500 3,025 2,475 5,500 . Flood Control Workshop 3,500 3,500 3,500 3,500 Regulations - Fill & Construction 30,000 30,000 16,500 13,500 28,700 --- ------ ----------- -----~- ---- ----- ---- ------ --- 'lUl' AL 1,073,381 _ 1,071138~ _~482- __~.!l6, 396 _ 14,500 861,186 ---- ------ ------ - ------ 1983 09 19 \ . Page V-~ 1984 BUDGET DIVISION Water Resource PROGRAM Conservation Services PURPOSE To carry out urban storm water management and master drainage planning studies and to carry out remedial control works where the prime objective is to reduce sedimentation 1984 OBJECTIVES - To carry out master drainage planning of the Authority's urbanizing watersheds such as the Rouge and Duffin Creeks - To carry out minor erosion and sediment control projects at six sites within Metropolitan Toronto. FUNDING -- The Urban/Rural drainage is a generally benefiting program which receives a 55% grant from the Province of Ontario The soil erosion and sediment control project is a Metropolitan Toronto benefiting project and forms part of the Metropolitan Toronto Erosion Control project 1982-1984 and receives a 55% grant from the province of Ontario. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services & Wages Utilities ~~ipme~ prop~rt.Y & Rent~_ TOTAL $ 1983 09 19 page Y:2. 1984 BUDGET DIVISION water Resource Program Conservation Services --- --- - - ------ -- ~----- 1984 BUDGET SOURCES OF FI NAOC ING 1983 BlDGET 1983 ACTUALS ACTIVITY -- - - NET -- PROVIOCIAL MUNICIPAL -- ------ ~- EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ ---$--- --S- $ $ --r $ --$-- urban/Rural Drainage 47,000 47,000 25,850 21 , 150 20,000 Soil Erosion & Sediment Control 65,000 65,000 35,750 29 , 250 (> ------- ----- - --~-- ~-~-- -~---- -- ----- ----- -- --------- 'lUl'AL 112,000 _ 112.!00.Q..__ _~~OO___ __~E.!~E.Q..__ 20,000 --------~ - - ----- ----- 1983 09.19 , Page V-l!. 1984 BUDGET DIVISION Water Resource PROGRAM Operation & Maintenance/Dams, Channels, Erosion Control Structures PURPOSE To maintain existing erosion and flood control capital works, the flood warning system and the operation of major flood control dams 1984 OBJECTIVES - To provide regular maintenance for the Authority's flood control, erosion control and shoreline management works FUNDING ---- This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services Survey & & Wag~ Utilities !:.Slu i pm e n t: Pr~erty & Rents _ Leg al...._ TOTAL $ 1983 09 19 page V-.2. 1984 BUDGET DIVISION Water Resource Program qJeration & MaintenancejDams, Channels, Erosion Control Structures 1984 BUDGET SOURCF.s OF FINAOCING 1983 BUDGET 1983 ACTlJALS ACTIVITY NET PROVIOCIAL -- MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDI~~ REVENY~ ~_EXPENDITURES REVENUES - $ $ $ ---$- $ $ $ $ $ --S- SnaIl Dams 15,000 15,000 8,250 6,750 14 ,000 Erosion ~rks 22,000 22,000 \ 12,100 9,900 7,000 I Regular Mainte- e 0 nance - Water Control Structures 100,000 100,000 55,000 45,000 75,000 Claireville Dan 18,000 18,000 9,900 8,100 14,334 G Ross Lord Dan 12,000 12,000 6,600 5,400 9,704 Flood warning Systan 46,750 46,750 25,7l2 21,038 33,376 - - -. -- ---- 'lUl'AL 213 750 213,750 117,562 96,188 ---- l53.!414 - - - 1983 09 19 Page Y::!.Q 1984 BUDGET DIVISION Water Resource PROGRAM Erosion Control PURPOSE -- To minimize the hazards of erosion to life and property within the valley systems and the Lake Ontario shoreline 1984 OBJECTIVES - Erosion Control work on the East Branch of the Highland Creek - To carry out remedial protection works on a priority basis on the major valleys within Metropolitan Toronto. - To carry out the first phase of the Bellamy Road Ravine Project - To carry out remedial measures on a priority basis along the Lake Ontario shoreline - To carry out remedial works on a priority basis on the major valleys in the Region of Peel - To carry out remedial works on a priority basis on the major valleys in the Region of York - To carry out remedial works on a priority basis on the major valleys in the Region of Durham - To continue to update and augment the current erosion inventories and priority li sts FUNDING The Highland Creek, Metro Erosion Control, Bellamy Road Ravine and the Shoreline Management Projects are Metro Toronto benefiting and receive a 55% grant from the Province of Ontario. The Peel, York, Durham erosion control projects are Peel, York and Durham benefiting respectively and receive a 55% grant The priorization study is a generally benefiting project and receives a 55% grant from the Province FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services Survey & .!.....!lages Utilities Equipment Pro"p'erty. & Rents Leg a 1 TOTAL $ 1983.09 19 . Page V-ll 1984 BUDGET DIVISION l'later Resource Program Erosion Control --- - - --- --------- 1984 BUDGET SOURCES OF FlNAOCING 1983 BUDGET 1983 AC'l'UALS ---- PROVIOCIAL MUNICIPAL ACTIVITY NET EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES - $ $ $ $ $ $ $ $ Highland Creek 540,000 540,000 297,000 243,000 150,000 Bellamy Road 1,550,000 1,550,000 852,500 697,500 -- Shoreli ne tt:lt 610,000 610,000 335,500 274,500 582,500 Erosion Control Major Maint 195,000 195,000 107,250 87,750 -- Priorization/ EnvirolTllental Studies 40,000 40,000 22,000 18,000 -- Metro 402,000 2,000 400,000 220,000 180,000 396,500 11 , 500 Peel 18,000 3,000 15,000 8,250 6,750 35,600 5,600 York 20,000 20,000 11 , 000 9,000 23,500 3,500 Durham 5,000 5,000 2,750 2,250 5,000 . -- - -- ----- 1-- -- - --- ----- 'lUl' AL 3,380,000 5,000 - 3,375,000 1,856,2~.!l_ ~, 518, 75.!l_ ---- 1,193,100 20,600 -- -- 1983 09 19 . Page V-12 1984 BUDGET DIVISION Water Resource ----- PROGRAM Flood Control Planning and Remedial Measures PURPOSE --- To undertake a comprehensive program of flood control designed to prevent, eliminate or reduce the risk of hazard to li fe and property, while cognizant of the natural attributes of the valley system. 1984 OBJECTIVES - Completion of the Bolton flood protection works - preliminary engineering studies on Black Creek in the City of York, Don River at Bayview and Bloor, and an update of Authority hydrology - Completion of flood protection works on Duffin Creek in pickering and Ajax - Detail design and first phase of dredging of the Keating Channel - Replacement of Goodwood Pumping Station - purchase of flood warning equipment - New floodplain mapping of headwater areas under Canada/Ontario Flood Damage Reduction Program. FUNDING -- This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities except for the Pickering/Ajax project and the Goodwood Pumping Station which are Region of Durham benefiting and the Keating Channel which is Metro Toronto benefiting FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials -------------------------- Salaries Supplies & . Real Services ~ Wages__ utilities Eq u i pme.!l..!. propert:.Y & Rents TOTAL --- $ 1983 09 19 Page V-13 1984 BUDGET DIVISION: Water Resource Program: Flood Control Planning and Renedial Measures --- -- --- 1984 BUDGET SOURCES OF FINAOCING 1983 BUDGET 1983 ACI'UALS ACTIVITY NET PROVIOCIAL MUNICIPAL - EXPENDITURES REVENUES EXPEND I 'l'URES GRANT LEV'! OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ ""T $ ~ $ $ ~ f1 $ $ Bolton Renedial Works 50 , 000 50 , 000 50 , 000 1,135,000 Flood Control Eng Studies 120,000 120,000 66,000 54 ,000 25,000 Envirorroental Studies 13 , 500 Pickering/Ajax Ranedial Works 350,000 350,000 192,500 157,500 Keating Channel 425,000 425,000 233,750 191,250 Goodwood 175,000 175,000 96,250 78,750 Flood Control Major Maint 43,500 43,500 23,925 19,575 148,000 Flood Warning Equipnent 10,000 10 , 000 5,500 4,500 14 , 500 Floodplain Mapping 300,000 300,000 120,000 30,000 150,000 - - 'lUl' AL 1,473,500 1.473,500 737,925 535, 57?_ t-lOO,OOO 1 33.6,000 - 1983 09 19 I , Page V-14 1984 BUDGET DIVISION Water Resource ----- 1984 BUDGET SOURCES OF FINAOCING~. 1983 BUDGET 1983 ACTUALS - PROGRAM NET PROVINCIAL MUNICIPAL~~ EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~EVENUES ~ $ $ $ $ $ $ T $ -- ----r-- Waterfront . Administration 269,000 269,000 132,000 137 , 000 211,239 Lake ontario Waterfront Developnent 1,810,000 150,000 1,660,000 830,000 605,000 225,000 1,531,261 150,000 --- - 'lUl'AL 2,079,000 150,000 1,929,000 962,000 74} , 009_r--J.25 , 000 ~2,500 150,000 - 1983 09 19 .. . Page Y_-15 1984 BUDGET DIVISION Water Resource ------------ PROGRAM Waterfront Administration -----------------.. PURPOSE -- , To provide administrative, planning, biological and engineering staff necessary for implementing Waterfront projects. 1984 OBJECTIVES - To proceed with design and construction of waterfront areas - To proceed with planning and approval submissions for future waterfront works FUNDING -- This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities FINANCIAL COMMENTS --- -- OBJECTIVE CLASSIFICATIONS Materials ----- Salaries Supplies & Real Services & Wages Util i ties ~~j-p~en_t: ~~~_E.!Y. & Rents TOTAL ------ --- $ - 1983 09 19 Page V-li 1984 BUDGET DIVISION Water Resource Waterfront Administration ----------- Program ---_. - - 1984 BUDGET SOURCES OF FINAOCING' 1983 BUDGET 1983 ACTUALS - NET PROVIOCIAL MUNICIPAL ACTIVITY EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~~S --- $ $ $ $ $ $ I? $ $ $ Salaries 179,952 179,952 89,976 89,976 132,075 Benefits 60,000 60,000 30,000 30,000 58,164 Travel 9,000 9,000 4,500 4,500 9,000 Data Processing 5,048 5,048 2,524 2,524 5,000 General Expenses 10,000 10 ,000 5,000 5,000 7,000 W.F WOrkshop 5,000 5,000 5,000 , e -- -- -- 'lUl' AL 269,000 269,000 132,000 137,000 211 239 - - 1983 09 19 Page Y_-12 1984 BUDGET DIVISION Water Resource ----- PROGRAM: Lake Ontario Waterfront Devel02ment PURPOSE ----- The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline, within the area of the Authority's jurisdiction, a handsome waterfront, balanced in its land uses, which will complement adjacent areas, take cognizance of existing residential development and make available, wherever possible, features which warrant public use 1984 OBJECTIVES --~--- - Continue development at Colonel Samuel Smith Park and East Point Park - Complete development at Humber Bay West. - Continue development of Ajax Waterfront - Construct changehouse and washroom at Bluffers Park Phase II . . FUNDING This is a shared program, 50% of the funds being available from the provinae of Ontario and the balance being funded from the Waterfront Capital Levy on all participating municipalities FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services ~ Wages Util !ties ~.9.~me n t pro~ert.Y & Rents TOTAL -- $ 1983 09 19 Page V-18 1984 BUDGET DIVISION Water Resource progran Lake Ontario Waterfront Developnent - Capital ---~-------- -- - -.- --- ---~-- 1984 BUDGET SOURCES OF FINI\tr.ING 1983 BUDGET 1983 ACTUALS NET PROVIOCIAL MUNICIPAL -- AcrIVITY EXPENDITURES REVENUES EXPENDITURES GRANT r--~~ OTHER EXPENDITURES REVENUES EXPEND ITURES REVENUES - $ $ $ $ -- -S $ $ -S- -$- $ San sni th 487,000 150,000 337,000 168,500 168,500 400,000 150,000 Humber Bay West 100,000 100,000 50,000 50,000 130,000 Aquatic Park Master Plan 62,000 62,000 31,000 31,000 40,000 Bluffers Toplands 100,000 Bluffers Park Phase II 510,000 510,000 255,000 30,000 225,000* 330,000 \ East Point Park 400,000 400,000 200,000 200,000 344,261 Ajax Waterfront 60,000 60,000 30,000 30,000 30,000 Sundry Sites 55,000 55,000 27 , 500 27 , 500 WF Workshop 10,000 10,000 5,000 5,000 East Point E.A. 50,000 50,000 25,000 25,000 site Planning 10 ,000 10,000 5,000 5,000 Env Studies 66,000 66,000 33,000 33,000 72,000 Marie CUrtis 55,000 Ashbridges's Bay 5,000 Petticoat Creek 5,000 Pre.Dev Prop 20,000 - 'lUl' AL 1,810,000 150,000 1,660,00E___~~30,OOO 605,000 __ 225,000 _..!-,53l,26l 150,000 - - LeVIes on hand 1983 09.19 page VI-l 1984 BUDGET THE CONSERVATION LAND MANAGEMENT DIVISION , This Division is responsible for the Watershed Recreation Program which includes the planning, development, operation and maintenance of recreational uses of conservation lands and all related activities inc1udi ng the operations of the Authority's central stores. This Division is responsible for the implementation and administration of the Conservation Land Management program for private landowners and the resource management of lands acquired as part of the Flood Control and Waterfront programs, except those under management agreements with municipalities. . 1983.09 19 . 1984 BUDGET Page VI-2 1983 ACHIEVEMENTS Conservation Land Management Developed new E S.A. management program . Expanded Authority nursery operation Intensified forest management programs on Authority owned lands Completed projected resource management programs: reforestation, tree and shrub, stream improvement and woodlot management Watershed Recreation Preparation of Boyd Master Plan Further restoration work on Bruce's Mill Construction of Albion Hills washroom and picnic shelter; Indian Line Campground Control Building and laundromat Development of Equestrian Centre at Clairville Extension to Cold Creek Trap Range Building Operated and maintained 7 Conservation and 3 Forest and Wildlife Areas providing 1 million user days of recreation Upgraded and developed nature trails Designed and installed information boards and reviewed Area signage Continued visitor services programs including group canoe course Revised lifeguard manual and continued water sampling program. 1984 PRIORITIES Conservation Land Management , - To carry out new E.S A management program on Authority, pUblic and private lands - To increase forestry management programs on Authority lands. - To ~ontinue resource management planning activities for private, public and Authority lands. - To increase sediment control program activities. Watershed Recreation - To operate and maintain 7 Conservation Areas and 3 Forest and Wildlife Areas. - To maintain 2 Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use. - To continue visitor service program. - To maintain high level of winter safety . - To obtain approval under the Environmental Assessment Act for Boyd Master Plan; continue work on other Area Master Plans; and carry out an economic feasibility study for Claireville Conservation Area. - To develop permanent washroom and refreshment facilities at Claireville; repair the Cold Creek rifle range shelter; complete the final phase of development of the Indian Line Campground; and improve visitor access at Petticoat Creek and Indian Line 1983 09.19 Page YI -l 1984 BUI:lG:'r DI VIl'l ION: _~ervati.9.!!..Y'~_ Man?9.anent -------- ------------ -------------------- - -------------... 1984 BUDGET OOURCES <F FI~ING 1983 BmGET _1983 ~~_______ PROGRAM ------ --NET - PROVIOCIAL - MUNICIPAL --- -- EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPaIDITURES REVENUES EXPENDITURES REVD/UES ------- $ - ~ --r-- --$ $ $ -- $--- -----$-- ----S--- Program Administration 804,711 804,711 402,356 402,355 673,204 Watersha:1 --~ RecreatIOn - P laririIiij 104,000 104,000 52,000 52,000 75,000 - Developnent 462,650 462,650 231,325 231,325 181,960 - Operations 2,511,600 1,127,000 1,384,600 1,384,600 2,180,000 1,016,000 Conservation Land -Him~ement-- :.-p annTrij 133,500 133,500 73,425 60,075 118,500 - Tree Planting/ Forest folJt 326,500 165,500 161,000 88,550 72,450 267,881 132,000 - Soil Erosion/ Sediment Control 48, 500 48 ,500 26,675 21,825 41,300 2,000 - Fish,Mildl,ife Management 31,000 31,000 15 , 500 15,500 10,500 ------- ----- ----------- ----------- ---- ------- ------ -------- --------- 'lUl'AL 4, 422.146.!.. 1, 292 ,50.Q.. 3,129.!96l ___ 889.!83l _~ 24.!l.rl}~_ __}.!_548,345 1,150,000 -------- ------- ----- ---------- \ 1983.09 19 Page y!..=.! 1984 BUDGET DIVISION Conservation Land Management PROGRAM Program Administration PURPOSE: To provide support services, to administer and develop Authority owned conservation lands and to provide a program of conservation land management on public and private lands. Administration of the Central Services Workshop. 1984 OBJECTIVES - To provide adequate staff and services to implement the 1984 program. FUNDING This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services & Wages utilities Equipment Propert~ & Rents TOTAL $ 759,736 22,250 22,725 804,711 1983 09 19 1984 BlDrnT Page YI-1 Program Administration DIVIS1Ot!._~~}vatio!l-.!-a~~_~039~.! Program: ----------------- ------ ---- -- ----------------------------------- ------------ ----- - -- 1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS ACTIVITY -~ PROVIOCIAL" -MUNICIPAL - ---------- -- -------- ---- EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ---------- $ - $ $ ----$---- ---$--- ---"$ -----r-- S- ---"$--- ----$-- !lead Office - Saianes&" Wages 321,553 321,553 160,777 160,776 299,512 Travel 15,525 15,525 7,762 7,763 14 ,000 Benefits 346,760 346,760 173,380 173,380 248,374 Util i ties & Services 6,600 6,600 3,300 3,300 8,900 Central Services Salaries & Wages 91,423 91,423 45,712 45,711 83,518 Travel 7,200 7,200 3,600 3,600 4,000 Util i ties & Services 15,650 15 ,650 7,825 7,825 14 ,900 ---------------- --------- ------- ------ ---------- -------- ------- --- -- ------- -------- 'lUl' AL 804.1 711 ___ 804,711 40}.!}56___ __ 40}.! 35~_ ___~J3,204 ----------- --------- ----- ---- 1983.09 19 , . Page VI-6 1984 BUDGET DIVISION Conservation Land Management PROGRAM Watershed Recreation Program - Planning PURPOSE To provide long-term and site planning for the development and operation of Conservation Areas and Forest and wildlife Areas 1984 OBJECTIVES: - To obtain approval of the Boyd Master Plan under the Environmental Assessment Act, 1975. - To proceed with the preparation of detailed design drawings and specifications for facilities proposed in Phase I of the Boyd Master Plan - To carry out a market analysis and economic feasibility study for existing and proposed recreational opportunities in the Claireville Conservation Area. - To complete the preparation of Conservation Area Master Plans. FUNDING This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services & Wages Utilities Equipment Property & Rents TO'fAL $ 27,740 4,460 1,800 70,000 104,000 1983.09 19 . Page VI -2. 1984 BUDGET watershed Recreation - Planning DIVIl'ION.:__ Conser'y.?}io.!l-1-.?~~~..!:. Program: -------- ------------------- ---- . ----------------- -- --- ----------------------- 1984 BlJDGET SOURCES OF FINAOCING 1983 BWGET 1983 ACTUALS ACl'IVITY ----- NET PROViocIAL-- MUN'iCIPAl.- ------ ------ ------ EXPENDITURES REVENUES EXPENDITURES rnANT LEVY OTHER EXPENDITURES REVENlIES EXPENDI TURES REVENUES -- $ $ $ --$--- -----:[--- ---$ ---r-- $ $ ---"$-- Boyd Master Plan E.A. Approval 25 ,000 25,000 12,500 12,500 Boyd Master Plan Phase I Site Planning 10,000 10,000 5,000 5,000 Claireville Feasibil i ty Study 35,000 35,000 17,500 17,500 General Planning 34,000 34,000 17,000 17 ,000 Boyd Master Plan, Stage II 75,000 \ ---------- 1------- ---- 1-------- ------------ ----------- ----- -------- ----- ---------- ------- 'lUl'AL 104,000 ____..!-04~ ____~2, 000 __ ____~_~E.!l_ --------- ____J11 O(jo__ -------- ~--------- ------- ----- -- 1983 09.19 , . Page VI-8 1984 BUDGET DIVISION Conservation Land Management PROGRAM Watershed Recreation - Development PURPOSE To develop grounds, facilities and services to provide outdoor recreation opportunities in accordance with the policies and program direction as established in the Watershed Plan . 1984 OBJECTIVES: - To construct a washroom and refreshment building in the beach area at Claireville Conservation Area and a washroom and shelter in the main picnic area at Heart Lake. - To reconstruct the rifle range building at Cold Creek to meet O.P.P. safety standards - To complete campsite development at Indian Line and construct a pedestrian pathway to link the campground with the day use area in Claireville. - To relocate the control booth at the Petticoat Creek pool to allow all area visitors use of washroom facilities. . FUNDING This is a shared program, 50% of the funding being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Real Services & Wages Utilities Equipment Property & Rents TOTAL -- $ 181,300 281,350 462,650 1983 09 19 1984 BlDGET Page VI -9 DIVISION Conservation Land Managenent Program: Watershed Recreation - Developrent 1984 BUDGET OOURCES OF FINAOCrNG 1983 BWGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITlJRF,S GRAN!' LEVY OTHER EXPENDITURES RIMlWES EXPENDITURES REVENUES -S :;; $ :;; -$ $ I? $ $ :;; BO:A - Award Day 1,650 1,650 825 825 1,650 C'ville - Washrm. Refresltnt.Bldg 200,000 200,000 100,000 100,000 Cold Creek - Rifle Range 31,500 31,500 15,750 15,750 Heart Lake - Washrm ./Shelter 80,000 80,000 40,000 40,000 Indian Line Camp- ground Extension 120,000 120,000 60,000 60,000 Indian Line - Pedestrian Path 15 f 000 15,000 7,500 7,500 Petticoat Creek - , . Control Booth 14,500 14,500 7,250 7,250 Access - Disabled Persons 21,960 Albion Hills - Washrocrns 71 ,000 Indian Line - Control Bldg . 86,000 Cold Creek - Entrance Dev. 1,350 'lUl'AL 462.650 462,250 231,325 231,325 181,960 1983 09 19 t . page VI-lO 1984 BUDGET DIVISION Conservat~on Land Management PROGRAM Watershed Recreation - Operations and Maintenance PURPOSE To provide funding for the operations and maintenance component as identified in the Watershed plan for providing recreation opportunities on Authority lands. 1984 OBJECTIVES _ To operate and maintain seven Conservation Areas and three Forest and Wildlife Areas to provide 1.1 million user days. _ To maintain two Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use. _ To continue self-supporting visitor services programs to increase accessibility of recreation opportunities - To maintain a high level of visitor safety. FUNDING Program revenues provide approximately 45% of required funding, the balance being a general levy on all participating municipal! ties. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services & Wages utilities Equipment & Rents Taxes TOTAL $ 1,453,800 563,450 289,400 204,950 2,511,600 . . 1983.09.19 . Page VI-ll 1984 BlDGET DIVISION Conservation Land Management Program watershed Recreation - Operations and Maintenance 1984 BUDGET SXJRCES OF FINAOCING 1983 BlDGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES I EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ $ ~ $ $ $ $ $ $ , Albion Hills 395,350 204,500 190,850 190,850 361,300 180,000 Boyd 248,850 105,000 143,850 143,850 210,950 103,000 Bruce's Mill 299,450 164,400 135,050 135,050 268,250 150,000 Clarenont 12,550 12,550 12,550 15,000 Clairevi lIe 375,100 260,000 115, 100 115,100 335, 100 249,000 Cold Creek 227,950 90,000 137,950 137,950 191,000 74,000 Glen Haffy 157,650 47 , 200 110,450 110,450 137,800 43,000 Greenwood 194,800 50,100 144,700 144,700 165,300 43,000 Heart Lake 215,450 80,200 135,250 135,250 188,550 72,000 Humber Trails 7,650 7,650 7,650 4,000 Pal grave 19,950 12,000 7,950 7,950 18,450 9,000 Petticoat Creek 279,350 113,600 165,750 165,750 238,350 93,000 Woodbr idge 12,800 12,800 12,800 12,000 General 64,700 64,700 64,700 33,950 'lUl'AL 2,511,600 1,127.000 1,384,600 1,384,600 2,180,000 1,016,000 1983.08 24 . Page VI-12 1984 BUDGET DIVISION Conservation Land Management RETAIL SALES AREA GATE REVENUES PROGRAM REVENUES REVENUES TOTAL $ $ $ S Albion Hills 76,500 114,000 14,000 204,500 Boyd 95,000 6,000 4,000 105,000 Bruce' sHill 98,500 37,900 28,000 164,490 Claireville 71,000 182,000 7,000 260,000 Cold Creek 24,600 26,200 39,200 90,000 , Glen Haffy 32,400 11,300 3,500 47,200 . Greenwood 33,500 11,500 5,100 50,100 Heart Lake 63,500 9,500 7,200 80,200 Palgrave -- 12,000 -- 12,000 Petticoat Creek 72,000 37,100 4,500 113,600 TOTAL 567,000 447 500 112.500 1.127.000 1983.09 19 , ~ Page VI-13 1984 BUDGET DIVISION Conservation Land Management PROGRAM Conservation Land Management - Conservation Planning PURPOSE To provide technical advice to private landowners to promote sound land management programs To carry our resource management planning activities for Authority lands and technical advice to agencies managing Authority lands in urban areas. 1984 OBJECTIVES: - To continue to provide technical advice for reforestation, farm tree and shrub plantings, woodlot management, pond management and stream impr ovemen t to private and public landowners. - To provide E.S.A. management technical advice to private and public landowners. - To prepare resource management plans for Authority owned lands. FUNDING This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalites. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Services & Wages Utilities & Rents TOTAL $ 125,527 7,473 500 133,500 \ . 1983 09.19 Page VI-14 1984 BlDGET DIVISION Conservation Land Management progran Conservation Land Management - Conservation Planning 1984 BllDGET OOURCES (F FINAN;::ING 1983 BlDGET 1983 ACTUALS A0'IVITY NET PROVI~IAL MUNICI.PAL EXPENDITURES REVEJIDES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES fJ fJ $ $ $ $ $ $ $ $ Conservation Planning 133,500 133,500 73,425 60,075 118,500 < 'lUl'AL 133,.500 133,500 73,425 60,075 118,500 1983.09 19 I . Page VI-15 1984 BUDGET DIVISION Conservation Land Management PROGRAM Conservation Land Management - Tree Planting/Forest Management PURPOSE To provide technical assistance to private landowners to promote sound water conservation programs. To carry out resource management programs for Authority dlands and public landowners 1984 OBJECTIVES: - To continue to provide reforestation, farm tree and shrub plantings. - To increase revenues from plant propagation. - To provide a program of E.S.A. management on private, public and Authority lands. - To increase woodlot and forest. management activi ties on Authori ty lands. FUNDING This is a shared program, 55% of the funds being available fro~ the Province of Ontario and the balance being funded from the general levy on all participating municipalities FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Services & Wages utili ties r, Rents TOTAL $ 232,500 46,070 47,930 326,500 1983.09 19 1984 I3l.DG:T Page VI-16 DIVISION: Conservation Land Management progra:n Conservation Land Management - Tree Planting/Forest Management . 1984 BUDGET OOURCES (F FINAN;::ING 1983 BtDGET 1983 ACTUALS ACTIVITY NE'f PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVmUES EXPENDI TURES REVENUES $ $ $ $ $ $ $ $ $ $ Plant Propagation 145,000 135,000 10,000 5,500 4,500 123,170 120,000 . Reforestation 31,000 5,500 25,500 14,025 11,475 22,700 2,000 Farm Tree & Shrub 15,000 15,000 17,900 10,000 Resource Management 15 , 500 15 , 500 8,525 6,975 13 , 500 Forest Management 95,000 10,000 85,000 46,750 . 38,250 57,318 E.S.A. Management 25,000 25,000 13,750 11,250 Woodlot Management 33,293 'lUl'AL 326,500 165,500 161,000 88,550 72,450 267,881 132,000 1983 08.25 Page VI-17 1984 BUDGET DIVISION Conservation Land Management PROGRAM Conservation Land Management - Soil Erosion/Sediment Control PURPOSE To provide technical assistance to private, public and Authority owned lands for sediment control. 1984 OB.IECTIVES - To continue to carry out programs of stream improvement, fencing, tree and shrub plants in rural and urban areas for off-stream and on-stream sediment control . FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities. FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Materials Salaries Supplies & Services & Wages Utilities & Rents TOTAL $ 19,500 18,500 10,500 48,500 1983 09 19 Page VI-18 1984 BI.IJrnT . DIVISION Conservation Land Managenent Program Conservation Land Managenent - soil Erosion/Sediment Control I 1984 BUDGET OOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REvrntJES EXPENDITURES REVENUES $ $ ~ ~ ~ ~ ~ ~ -~ ~ Stream Improvenent 25 , 000 25,000 13,750 11 , 250 20,000 2,000 Urban Managenent 23,500 23,500 12,925 10,575 21,300 . 'lUl' AL 48,500 48,500 26,675 21,825 41 , 300 2,000 1983 09.19 Page VI-19 1984 BUDGET DIVISION Conservation Land Management PROGRAM Conservation Land Management - Fish/Wildlife Management PURPOSE To carry out a program of fish rearing and stocking for selected Authority Conservation Areas and Forest and Wildlife Areas To carry out a program of fish management and wildlife habitat improvement for private and public landowners and on Authority lands. 1984 OBJECTIVES - To produce approximately 45,000 rainbow trout . - To continue fish management projects on cold water streams following priority lists - To carry out trree and shrub plantings on Authority lands in rural and urban areas of the watershed. FUNDING This is a shared program, 50\ of the funds being available from the Province of ontario and the balance being funded from the general levy on all participating municipalities FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services & Wages utilities & Rents TOTAL (; 8,500 17,500 5,000 31,000 1983 09 19 . . 1984 BlDGET Page VI-20 DIVISION Conservation Land Managanent progran: Conservation Land Managanent - Fish/Wildlife Managanent 1984 BUDGET OOURCES OF FINAOCING 1983 BWGET 1983 ACWALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVmUES EXPENDITURES rnANT LEVY arHER EXPENDITURES REVmUES EXPENDI TURES REVENUES $ $ $ $ $ $ $ $ $ $ Glen Haffy - Fish Rearing 11 , 000 11 ,000 5,500 5,500 10,500 Fish Managenent 5,000 5,000 2,500 2,500 wildlife Habitat Improvenent 15,000 15 , 000 7, 500 7,500 'lUl' AL 31,000 31,000 15,500 15,500 10,500 1983.09 19 Page VII-l 1984 BUDGET THE INFORMATION AND EDUCATION DIVISION This Division is responsible for the Community Relations program of the Au thori ty. Conservation Information functions include - the implementation of the general information programs, including the provision of both internal and external communications: - information on resource management programs: and - planning, market research, information and medIa contact. I Conservation Education functions include . - conservation field centres: - various heritage, conservation and interpretive programs: and - the Kortright Centre for Conservation . 1983 09 19 1984 BmGET Page VIl-2 CONSERVATION INFO~TION 1983 Achievements _ Provided, at an increased level of service (as a result of the Canada ontario Dnployment Developnent Program - C.O.E.D.), a COnservation Information Progran for Authority nenbers and staff, the general public and special interest and camnmity groups _ Provided, through market analysis, a communications progran for the Authority's public use facilities, completed a Summer Visitors' survey report: implemented the 1983 Marketing Plan for the COnservation Areas, Black Creek Pioneer village and the Kortright Centre for COnservation _ provided information on the Authority's resource management programs: tours of the various watersheds. - Developed the 1984 Marketing Plan. .. 1984 Priorities _ To provide in 1984 a satisfactory level of service in the COnservation Information Program. _ To review and revise the communications program for the Authority's public use facilities, as required by the results of the 1983 Visitors' Survey: implement the 1984 Marketing plan. _ To increase the level of information, through seminars and technical bulletins, on the Authority's resource management programs. CONSERVATION EDOCATION 1983 Achievements _ MaIntaIned the number of residential opportunities at the four residential field centres and day-use opportunities at COld Creek Conservation Field Centre, Black Creek pioneer village and Bruce's Mill. _ Increased visitation to Kortright Centre for COnservation to 90,000 _ Co-operated with York and G.1elph Universities and the Canada Centre for Inland waters in envirorrnental research at Lake St. George _ Provided opportunities for special groups at the residential field centres (March of Dimes, York University, Archaeology Program). _ Further developed thane prograns for the Kortright Centre in Fish & Wildlife, Forestry and water: canpleted the first phase of the Renewable Energy Theme Program. _ Made substantial progress on the major maintenance at the Albion Hills, Clarenont and Cold Creek Field Centre and at the Kortright Centre for COnservation as well as at Lake st. George (as a result of the C.O.E.D Program) 1984 Priori ties _ To maIntaIn the number of residential and day-use opportunities. _ To accamodate 10,000 additional visitors at the Kortright Centre for Conservation. _ To continue the development of audio-v~suals, exhibits and demonstrations at the Kortright Centre for COnservation. _ To maintain the present level of volunteer staff at Black Creek pioneer Village, to reduce staff costs and increase funds available for operations and maintenance. _ To continue to provide General Interpretive Programs at program cost. _ To continue major maintenance at Albion Hills, COld Creek, Clarenont Field Centres and the Kortright Centre for COnservation: to establish a major maintenance fund _ To canp1ete construction and cannence operations at the Etobicoke Envirormental Centre, in co-operation with the Etobicoke Board of El:1ucation 1983 09 19 , . \ . Page ~k}_ 1984 BUDGET DIVISION: Information & Education ------------------- ------ -- - ------------------ -------------- 1984 BUDGET OOURCES OF FINAOCI~ 1983 BlDGET 1983 ACTUALS PROGRAM -- --- --NET PROVIOCIAL -"t.fuNICWA1-- ------ ------ --- ------- ------- EXPmDI'l'URFS REVENUES EXPENDI'l'URFS GRAN!' LEVY OTHER EXPENDI'l'URFS REVENUES EXPENDITURES REVENUES ----- ---r --,.-- ---~-- --""T--- --$--- -"$-- ------$-- --~- ---$-- ----$-- !,~ram...~i.!1..:.. General 330,130 330,130 165,065 165,065 300,420 Inform. Suppor t 65,475 65,475 32,738 32,737 64,842 Education SUpp 35,982 35,982 17,991 17,991 35,108 Data Processing 15,000 15,000 7,500 7,500 15,000 44~,58~ ~~J~87 ~}}J}9~ ~23,29~ Il:?J 370 CamlUn i ty Relations Inform. .. GeneraC---- 84,127 84, 127 45,270 38,857 80,127 Resource fi]t 11,000 11,000 6,050 4,950 11,000 Planning/Market Analysis 94,743 94,743 94,743 90,243 Carmun i ty Relations Educ - supv-:ops-"& Mtce. 1,261,560 1,119,500 142,060 60,060 82,000 1,273,083 1,136,300 Supv Ops & Mtce. Kortright 478,600 286,500 192,100 20,400 137,500 34,200 442,000 264,850 Developnent 191,000 191,000 50 ,000 50,000 91,000 114,800 ------ -- -- -------- --------- --------- -------- ----------- ------- ----------- ------~ TOTAL 2,~67 ,617 1,406.tEOO ~.!.t~..!-2.. __J.!l..?J 07.!.__ ___ 63].J}J}___ ..!-_~J 20E_ __}JJ}6 , 6~~__ lJ 40..!-J_l:?0 --------- ------.. ----------- 1983 09.19 . Page VII-4 1984 BUDGET DIVISION: Information & Education PROGRAM program Administration PURPOSE: To provide an administrative, supervisory and support service staff to implement a comprehensive information, community and staff relations and outdoor and conservation education program. 1984 OBJECTIVES: - To continue the programs carried out in 1983 at the same level of service. FUNDING This is a shared program, 50% of the funds from the Province of ontario and 50% from the general municipal levy. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS Salaries Services Ii Wages & Rents TOTAL $ 253,731 192,856 446,587 1983.09.19 \ 1984 BlDGET Page VII-5 I DIVISION: information and Education Program Program Administration 1984 BUDGET OOURCES OF FINAN;::ING 1983 BlIJGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES 'EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ $ $ $ $ $ $ $ $ . - General Salaries 151,574 151,574 75,787 75,787 142,966 Expenses 6,760 6,760 3,380 3,380 4,800 Benefits. 151;796 151,796 75,898 75,898 124,237 Severance , Vacation, Sick & Statutory Pay 20,000 20,000 10,000 10,000 28,417 330,130 330,130 165,065 165,065 300,420 CCrmnBl i ty Relations Inform Support: Salaries 61,975 61,975 30,988 30,987 61,142 Expenses 3,500 3,500 1,750 1,750 3,700 65,475 65,475 32,738 32,737 64,482 CaTI1ltIl1 it y Relations Educ. Support: Salaries 34,182 34,182 17,091 17 ,091 33,908 Expenses 1,800 1,800 900 900 1,200 35,982 35,982 17 ,991 17 , 991 35, 108 Data Processing 15,000 15 ,000 7,500 7,500 15,000 'lUl'AL 446,587 446,587 223,294 223,293 415,370 · Benefits - include benefits for all full-time, contract and part-time anployees of the Information and Education Division 1983 09 .19 Page VII-6 1984 BUDGET DIVISION Information and Education PROGRAM Community Relations - Information - General PURPOSE To provide brochures, still and motion picture photographic materials, exhibits and special functions to implement the internal and external general information program of the Authority. 1984 OBJECTIVES: - To provide the materials necessaty to implement a satisfactory communications program in 1984. FUNDING This is a shared program, 55% of the funds being available from the Province of Ontario and 45% being funded from the general levy on all participating municipalities for pub~ications and printing, photographic materials, tours and special days, applicable to Water and Related Land Management progr~ms; and financed on a 50% Province of ontario grant and 50% general levy for all Conservation and Land Management programs. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Materials Supplies & Services Utilities & Rents TOTAL $ 59,400 24,727 84,127 10983 09.19 \ 1984 BtDGET Page VII-7 DIVISION: Information and Education ProgrClll: Community Relations - Information - General ~ 1984 BUDGET OOURCES OF FINAOCING 1983 BUJGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVmUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES l? l? $ l? l? l? $ l? l? l? Publications & Printing 52,827 52,827 29,055 23,772 51,827 Photographic 1,700 1,700 935 765 1,700 Tours & Special Days 9,600 9,600 5,280 4,320 8,600 Motion Picture Prog r CIll 8,000 8,000 4,000 4,000 8,000 Exhibits 10 ,000 10,000 5,000 5,000 8,000 , pranotional Contingency 2,000 2,000 1,000 1,000 2,000 'lUl'AL 84,127 84,127 45,270 38,857 80,127 I - 1983 09.19 Page VIl-8 1984 BUDGET DIVISION: Information and Education PROGRAM Community Relations - Information - Resource Management Programs PURPOSE: To provide information to the general public and specific audiences with respect to Authority Resource Management Programs. 1984 OBJECTIVES: - To increase the number of technical/semi-technical bulletins published - To arrange for resource management tours and seminars. FUNDING This is a shared program, 55% of the funds being available from the Province of Ontario and 45% being funde~ from the general levy on all participating municiaplities. FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Materials Supplies & Services utili ties & Rents TOTAL $ 9,500 1,500 11,000 . 1983.09.19 .. Page VII-9 1984 BlDGET DIVISION: Information and Education progrcrn Ccmnunity Relations - Information - Resource Managanent Prograns 1984 BUDGET roIJRCES <F FlNAlCING 1983 BUDGET 1983 ACTUALS ACfIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ $ $ . $ $ $ $ $ $ Watershed Plan Projects presentations and seni- technical publications re Watershed Program 11 ,000 11 ,000 6,050 4,950 11,000 , . 'lUl'AL 11 ,000 11,000 6,050 4,950, 11 , 000 1983.09.19 .. . Page VII-10 1984 BUDGET DIVtSION Information and Education PROGRAM Community Relations - Information - Planning/Marketing Analysis PURPOSE To provide an effective communications program to maintain or increase visitation to Authority public use facilities 1984 OBJECTIVES - To review and revise the communications program for the Conservation Areas, Black Creek Pioneer village and the Kortright Centre for Conservation, based on the results of the 1983 surveys and marketing studies - To implement a comprehensive marketing program. FUNDING Funding is provided by municipal levy on all participating municipalities FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services & Wages Uti 11 ties & Rents TOTAL -- $ 38,500 5,000 51,243 94,743 1983 09 19 0 1984 BtIlGET page VII-ll DIVISION Information and Education progran Oammunity Relations - Infonnation - Planning/Marketing Analysis 1984 BUDGET OOURCES OF FINAOCING 1983 BrnGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY O'mER EXPENDITURES REVENUES EXPENDITURES REVENUES $ $ $ $ $ $ $ $ $ $ Support 38,500 38,500 .. 38 , 500 34,000 supplies 24 , 500 24,500 24,500 24,500 pranotion and Advertising 31,743 31,743 31,743 31,743 --------- -- - 'lUl'AL 94_r 743 94,743 __ __JJ-I! 43 _--2E,243 -- ------- 1983 09.19 , . . Page Yl I-l~ 1984 BUDGET DIVISION: Information and Education PROGRI\M Communi~ Relations - Conservation Education - SU2~~YJ~J~~~~ra~J~~~~ai~tenance PURPOSE: --- To proviae an outdoor conservation education program for school students and other community groups at four (4) residential conservation field centres and a variety of outdoor and conservation education opportunities for the general public and school groups at Cold Creek, Bruce's Hill and Black Creek. 1984 OBJECTIVES: - To continue the program at the same level of services as in 1983 - To provide an outdoor and conservation education program for the following estimated number of students and adults: Conservation Field Centres 13,500 (Residential) Cold Creek, Black Creek & General Interpretive Programs 78,000 - To continue the major maintenance program at I\lbion Hills, Cold Creek and Claremont Field Centres \ FUNDING -----~- Program revenues and the general levy on all participating municipalities. A surplus or deficit on the operations of the Boyd and Lake St. George Conservation Field Centres will, by agreement, be charged or credited to the participating Boards of Education. The cost of supervisory staff at Albion Hills, Boyd, Lake st George and Claremont is funded by a 55% grant from the Province of Ontario, 45% being funded from the general levy on all participating municipalities FINANCIAL COMMENTS: OBJECTIVE CLI\SSIFICATIONS: Materials Salaries Supplies & Services & Wages Utilities ~~"'!p'me~_t: & Rents TOTAL ----~-- ---~- $ 665,100 115,800 34,960 445,700 1,261,560 1983.09.19 . 1984 BlDGET Page ~I-13 DIVISION: Information and Education Frog r CIIl O:mnunity Relations - Conservation Education - Supervision, Operations and Maintenance ------ 1984 BUDGET OOURCES OF FINAOCIOO 1983 BlDGET 1983 ACTUALS ACTIVITY NET - PROVIOCIAL MUNICIPAL ---- - EXPENDITURES REVENUES EXPENDITURES GRANT LEVY EXPENDITURES REVENUES EXPENDITURES REVENUES $ --- ~-- $ -r -- - $ - ~---- ""T--- ProgrClll Supervision 109,200 109 , 200 60,060 49,140 106,909 Boyd C.F.C. 217,000 217,000 228,000 228,000 Lake st. George 398,500 398,500 443,000 443,000 Albion Hills 221,500 221,500 203,000 203,000 Claremont 219,500 219,500 207,000 207,000 Cold Creek F.C. 3B ,000 3B ,000 37,300 37 , 300 Gen. Interpreti ve 25,000 25,OQO 18,000 18,000 B.C P V (Tours & PLP) * * 142,674 * 148,750 * (6,076) * 157,500 * 163,500 Major Mtce Albion 32,860 32,860 32,860 29,874 - - -- ---- ---~- ----- 'lUl'1\L '-_ 1,261,560 1,119,500_ l42,.!l~.!l_ _-y0,060 _ _ 82,000__ _1, 273,.!l.!l}_ 1,1}6,300 ----- ------- -------~ --- * These amounts are included in the ~istorical sites Division Budget, and do not add to totals here. 1983.09.19 .. Page YJJ -14 1984 BUDGET DIVISION Information and Education PROGR^M: Community Relations - Conservation Education - Supervision, Operations and Maintenance - Kortri~~ PURPOSE To provide a conservation education program for the public, school and other community groups at the Kortright Centre for Conservation 1984 OBJECTIVES: - To provide program opportunities for 10,000 visitors over 1983 level, bringing visitation to approximately 90,000 FUNDING -------- Direct program costs are funded from fees, revenues for services, food and sale of merchandise. Basic operations are funded by a Ministry of Natural Resources grant of 55% on the Supervisor's salary, an M.T.R.C F. grant of $7,000 from the Growth Endowment Fund, with the remainder from the general levy on all participating municipalities FINANCIAL COMMENTS: ----~--------~- ~ OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services Financial & Wages Utili ties ~-~~~~ & Rents Taxes Expenses TOTAL ------ -----~- $ 297,275 133,475 1,050 46,800 478,600 1983 09 19 . 1984 BlDGET Page VII-15 DIVISION: Information and Education -----.-_- Program Community Relations - Conservation Education - Supervision, Operations and Maintenance - Kortright -- . 1984 BUIXET rotJRCES OF FINAOCING 1983 BUDGET 1983 ACTUALS 1\CTIVI TY - NET PROVIOCIM.--- ='"Mi.JNICIPAL - - ----- EXPENDI TIIRES REVEl'ruES EXPENDITURES GRANT LEVY Ol'HER EXPENDITURES REvmtJES EXPENDITURES REVENUES ~ ,..- ~ :;; -~ $ ~ -r --r-- Basic Operations 160,600 160,600 20,400 106,000 34 , 200 142,000 Programs - General 318,000 286,500 31,500 31,500 300,000 264,850 ----- ------ --- -----~ 'lUl' AL 478,600 286,500 192,100 20,400 , 137,500 1!t 200 _ _~~2,000 26_4..t.!l..?~ t..... ------ '-----,-------- -- -----~- 1983 09.19 Page YJJ.:}~ 1984 BUDGET DIVISION: Information and Education PROGRAM commun~ Relations - Conservation Education - Develoeme~~ PURPOSE: --- To develop the facilities required for the Authority's outdoor and conservation education programs. 1984 OBJECTIVES . - To continue development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation - To develop additional indoor exhibits, furnishings and equipment for the Kortright Centre for Conservation _ To develop the maintenance and service program for the Etobicoke Environmental Centre as per the Etobicoke/Authority Agreemen t. FUNDING: --- FINANCIAL COMMENTS: OBJECTIVE CLASSIFICATIONS Materials ---~-- Salaries Supplies & Services Ii< Wages utilities ~~~_t: & Rents TOTAL ----- $ 105,000 63,400 16,000 6,600 191,000 1983.09.19 , Page yg-17 1984 BlDGET DIVISION Information and Education Program: aammunity Relations - Conservation Education - Development - --- 1984 BUDGET OOURCES OF FINAOCIOO 1983 BUDGET 1983 ACTUALS ___ ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES ~XP.ENDITURES GRAN!' LEVY OTHER EXPENDITURES REVrnUES EXPENDITURES REVENUES ~ ~ --r ~- ~ -----r- ---~- ---~-- ---r-- Kortdght Developnent 100,000 100,000 50,000 50,000 100,000 Albion Hills 91,000 91,000 91,000 14,800 - -------- ---~ ---- --- 'lUl'AL 191,000 -- ~- 191,000 50,000 __L-___~E.!.!lOO Jl,OOE __..!}.~ ,800 ----~ 1983.09.19 .. Page Y.!lI-l , . 1984 BUDGET THE HISTORICAL SITES DIVISION This Division is responsible for the Heritage Conservation program, including the development and administration of the Black Creek pioneer Village, Albion House, historical markers and other historical buildings coming under the jurisdiction of the Authority 1983 09 19 page VII 1-2 1984 BUDGET 1983 ACHIEVEMENTS - Operated an increased number of buildings at Black Creek Pioneer Village with interpretive staff drawn from own staff and C.O.E.D. Program.. - Maintained village ground~, gardens, Peacock Woods and Head Office grounds with own staff and staff on C.O.E D. program, plus assistance from volunteers (Mimico program) . - Expanded and improved special events programming. - Established and filled position nf Promotions Officer to serve Village interests - Participated in Telidon network and brochure displays and excbange. - Secured funding to permit erection of Visitors Centre. . 1984 PRIORITIES - To establish Visitors Centre and ensure its profitable operation as soon as possible - To expand Promotions Officer activities to increase attendance at Village. - To further refine special events and programming - To continue to have maximum number of buildings staffed and open to public - To continue to develop staff skills in interpretation and conservation techniques - To control costs and ensure most effective use of available funds. 1983.09 19 . Page VIII-3 1984 BlDGET DIVISION Historical Sites " 1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS PROGRAM NET PROVINCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANl' LEVY OTHER EXPENDITURES REVENUES EXPElIDITURES REVENUES $ $ $ $ $ $ $ $ $ $ Program Administration 239,800 239,800 119,900 119,900 273,122 Operations & Maintenance 1,851,200 1,009,500 841,700 631,700 210,000 1,487,200 1,025,000 Conservation Education - Supervision 142,674 148,750 (6,076) (6,076) 157,500 163,500 Capital Developnent 1,868,000 1,868,000 1,868,000 1,995,000 Visitors Centre 67,500 42,700 24,800 24,800 - 'lUl'AL 4,169,174 1,200,950 2,968,224 119,900 770,324 2,078,000 3,912,822 1,188,500 - I 1983 09 19 . .. Page YIII-4 1984 BUDGET DIVISION Historical Sites PROGRAM: Administration PURPOSE To provide supervisory and support services to implement the heritage conservation program. 1984 OBJECTIVES - To provide the support services at the same level as in 1983. FUNDING This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the general levy on all participating municipalities. . FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS Salaries Services & Wages & Rents TOTAL ---.. $ 233,800 6,000 239,800 1983.09 19 page VIII-2 1984 BtDGET DIVISION Historical Si tes Program: Administration 1984 BUlXiET SOURCES OF_ FINAOCING__ 1983 BWGET 1983 ACTUALS ACTIVITY NET PROVINCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~ $ $ I? $ $ $ $ $ $ $ Salaries 47,100 47,100 23,550 . 23,550 45,000 Benefits 186,700 186,700 93,350 93,350 139,686 Travel 6,000 6,000 3,000 3,000 5,000 Vacation, sick & Statutory Holiday Pay * 83,436 -- - -- --- --- 'lUl'AL 239,800 239,800 119,900 _ 119, 9EE-- ____ __ 273,1~~ -- - ----- --- - - * In 1984, this line item is included with Black Creek Pioneer Village Operations and Maintenance - Supervision 1983 09 19 .. Page VI1J:-6 1984 BUDGET DIVISION: Historical Sites !'~2.9RAM__.Qp~ratio~2nd Maintenance.::_ Black Creek pioneer village PURPOSE: ---- To prov~de a living portrayal of a crossroads village in pre-Confederation Ontario 198.!.. OBJECTIVES - To continue to provide an ~ducational, recreational experience for visitors to the Village. - To increase attendance (by Promotions Officer and by Visitors Centre and improved programming) by 20,000 more than 1982 actual. - Increase visitor spending in food and material purchases by improved service and facilities. - To ensure most cost effective operation of village - Provide and encourage staff development and training in all aspects of museum (Village) operation and conservation Techniques. FUNDING .. ---- 72% of the funding comes from admission receipts, sales outlets and other village operations. The remainder comes from municipal levy (15 3%) and balance by grant from the Ontario Ministry of Citizenship and Culture FINANCIAL COMMENTS: ----------- Use of the C 0 E D. program in 1983 operations provided approximately $215,000 to permit the full staffing of all buildings and the opening of many that would otherwise have remained closed, notably Doctors House, Flynn House, Dominion Carriage Works and Sawyers House This accounts for the bulk of the additional levy money requested for 1984 to keep all buildings opened. If these funds are forthcoming from an alternative source, similar to C.O ED, the request for levy money would drop by a 11 ke amoun t Failing funds from either source, the Village would contain seven closed buildings and reduced staff in several of those open. OB JES.1'l VE-SLASS lXl CA T I O.!!L Materials Salaries Supplies & Services ~!lages _ Utili ties & Rents TOTAL -~--_. --------. $ 1,413,300 371,400 66,500 1,851,200 1983.09 28 1984 BUDGET page VII.!:"2. DIVISION: Historical Sites Program: Operations and Maintenance - Black Creek pioneer village 1984 BUDrnT SOURCES OF FINAN;:: IN(; 1983 BlDGET 1983 llCTUALS ACTIVITY NET - PROVIOCIAL MUNICIPAL --- EXPENDITURES REVENUES EXPENDITURES GRAN!' LEV!_ OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES $ ~ ~ $ r ~--- ~ ~ H$ ~ Supervision 586,800 5,000 581,800 581,800 505,100 3,000 Costtme Dept. 24,100 1,000 23,100 23, 100 23,500 1,000 Registrar 35,100 2,000 33,100 33, 100 34,500 2,000 Gatehouse 29,700 485,000 (455,300) (455,300) 24,500 505,000 Giftshop-Entrance 157,000 220,000 (63,000) (63,000) 130,200 205,000 Giftshop-Museum 31,300 36 , 500 (5,200) (5,200) 32,500 45,000 WEDdings 10,100 20,000 (9,900) (9,900) 8,800 20,000 Special Events 40,000 10,000 30,000 30,000 40,000 6,000 Livestock 103,700 3,000 100,700 100,700 97,000 4,000 Carpenter Shop 21,700 500 21,200 21,200 20,000 500 Peacock WOOds 10,000 ~O ,000 10,000 6,000 Food Operation 34,500 (34,500) (34,500) 14 ,000 55,000 Non-Designated Areas 60 , 100 60,100 40,100 20,000 41,000 Sleigh Rides 500 2,000 (1,500) (1,500) 500 3,000 Buildi~Activit. 741.100 190.000 551,100 371 , 100 180,000 509.600 175,500 -- f------- TOTAL 1.851.200 1,009.500 841,700 ----. 631,700 210 000 1,48] ,200 1,025,000 --- 1------ 1983 09 19 . . , Page VI...!]..::.!!. 1984 BUDGET DIVISION Historical sites PROGRAM Edu~ation Program PURPOSE To provide conservation education opportunities for school groups by group tours and by a pioneer Life program 1984 OBJECTIVES To maintain existing levels of service for 60,000 students combined in both Tour and Pioneer Life Programs. FUNDING ---- The program is planned to be self-Sustaining , FINANCIAL COMMENTS OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Services & Wages utili ties & Rents TOTAL ---_. ------ pioneer Life Program $ 41,394 9,550 60,294 Educational Tours $ 72,650 7,200 82,380 1983.09 19 1984 Bl.IaT Page VI 11-9 DIVISION: Historical Sites Program: Etlucation Progrcm -- 1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS ACTIVITY NET -- -POOVIOCIAL MUNICIPAL -- ----- -- EXPENDITURES REVrnUES EXPENDITURES GRAN!' LEVY OTHER __ ...!..~ENDITURES REVENUES EXPENDI'lURES ~VE;NUEE-. $ $ $ $ --s- ~ ---r $ ---r--- $ pioneer Life Program 60,294 44,625 15,669 15,669 61,400 44,500 Educational Tours 82,380 104,125 (21,745) (21,745) 96 , 100 119,000 , ----- ---- ---- ~---- 'lUl'AL 142,674 148,750 (6,076) __~76L -- 157.!~00 163,500 -- 1..-____ 1983 09 19 . Page VI 11:10 1984 BUDGET DIVISION Historical Sites ------------------- PROGRAM Capital Development !'J1~~ To carry out restoration and development work at the Black Creek pioneer Village in accordance with approved plans. 1984 OBJECTIVES --------- - To complete construction of Visitors Centre and open for full use. - To complete construction of Nesbitt Sawmill. - To finish internal and landscaping requirements of - Richmond Hill Manse - Sawyer's House - Masonic Temple/Hardware Store FUNDING ------- Funding to be provided by provincial aid (Wintario, Lottario), member municipalities and by The Metropolitan Toronto and Region Conservation Foundation. FINANCIAL COMMENTS ---------- OBJECTIVE CLASSIFICATIONS Materials ------------- Supplies & Utili ties TOTAL --- $ 1,868,000 1,868,000 1983.09.28 . I . 1984 BlDGET Page ~II-ll,. DIVISION: Hi.st.9}ical Si tes Progrilll Capital Development -- - -- 1984 BUlXiET SOURCES OF FINAN: 100 1983 BlDGET 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL ---- EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES ---- ~ ~ ~ -- $ $ $ $ $ -r- $-- Nesbitt Sawmill 50,000 50,000 50,000 85,000 Visitor Centre 1,800,000 1,800,000 1,800,000 1,800,000 Tinsmith 3,000 3,000 3,000 75,000 Rictmond Hill Manse 10 ,000 10,000 10,000 35,000 Sawyer's House 5,000 5,000 5,000 ------ -- - ---- --- ----- 'lUl' AL 1,868,000 1,868,000 -- ~_8,E.QQ __!tJJ~, 00.!l --- ---------------- - ------ 1983 09 19 Page YI I 1:12 1984 BUDGET DIVISION Historical Sites ---------------------------- PR2GRAM__ Vi.:;i tor.:;_ Cent.!~..:....~Etion~Ji~ainten2~ PURPOSE --- 1984 OBJECTIVES -------- To operate efficiently the Centre for at least two months (November, December) of the year . FUNDING --- Funding is available from municipal levy until such time as the Centre become self-sustaining. ~l~.!--SOMM~~ 9~i1~S1'IV~ CLASllIFICA1'10NS Materials Salaries Supplies & Real Services Financial ~.!lages utili ties ~J.pE1ent P r ..9.P~.E!.Y. & Rents Taxes !l]Cj>~~.!I- TOTAL ------ -~--- $ 1983 09.28 Page Y.!ll: 13 1984 BUDGET DIVISION Historical Sites Program: Visitors Centre - -- - - - 1984 BUDGET SOURCES OF FINAOCING 1983 _!3-lDG:T 1983 ACTUALS ACTIVITY NET PROVIOCIAL MUNICIPAL EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EE'ENDITURES REVENUES EXPENDITURES REVENUES ------ $ ~ ~ ---~ ~ $ $ $ $ $ . Visitors Centre 67,500 42,700 24,800 24,800 \ -- - --- ----- 1--------- --- 1------ 'lUl'AL 67,500 42,700 24,800 _________ ~.24 ,8.!l0__ ---- L-.-___~ - --- ------- 1983.09.19 \ , . Page 1~-1 1984 BUDGET . VEHICLE AND EQUIPMENT FUNDS Based on the principles of fund accounting, the Authority administers the Vehicle and Equipment Fund and Food Service Equipment Fund YEHICLE_~~R EQUIPMENT FUND The fund provides for the acquisition of replacement vehicles and equipment required to support various operating and maintenance activities. The fund is replenished by charges to operating and maintenance budgets. The level of recoveries is approved by the Ministry of Natural Resources and is intended to provide for the recapture of the original cost as well as for daily operating expenses. !OO~2~~Y1S~ EQUIPMENT FUND The fund provides for the acquisition of new and replacement capital equipment required for the operation of food facilities, in accordance with policy adopted by the Authority in 1983 The fund is replenished by recoveries from the food service operating budget. 1983.09 19 . Page IX-2 1984 BUDGET VEH ICLE AND~..Q!l I P~.!IT FUND~ PURPOSE To sustain the Authority's vehicles and equipment and food service equipment complement at adequate levels to assure economy, efficiency and productivity in various programs. 1984 OBJECTIVES: To acquire the following Division/progra~ Vehicle Re~lacem~nt New EqU~pme~ Replacement ~i-Ement --T - Water Resource 48,000 1,200 111,575 Conservation Land Management 102,800 2,350 Information and Education 11,000 Food Services --- 40,000 ----. 150,800 14,550 151,575 ==7===== ------ ------- . ------ ------- FUNDING -- Replacement vehicles and equipment are funded via recoveries (based on use) from operating divisions and include provincial grant and municipal levies as applicable through the Vehicle & Equipment Fund. New equipment and vehicles (excluding Food Service equipment) are funded from municipal levy. FINANCIAL COMMENTS -------- No recovery is available from the Ministry of Natural Resources for Food Service Equipment. It is necessary to derive funds for Food Service Equipment from the Food Service operating revenue 1983.09.19 . Page JX-}_ 1984 BlIXET VEHlfLE ~ muIfMENT_~_ ------ ----------------------- ----------- ---------------------- 1984 Bt.lIXET rouRCES (F FINAOCING 1983 BUDGET __~.!lL~.Q'UALS______ - ----- - -- MUNICIPAL - --- ------ ------ ACTIVITY NET PROVIOCIAL EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES - ,.-- "T- ---r- ---~-- ---~---- $--- --~ r-- ----~---- ----~- Vehicles - New - Replacanent 150,800 150,800 150,800 67,000 Equipnent - New 14,550 14,550 14,550 13,600 - Replacanent 111,575 111,575 111,575 150,130 Food Services Equipnent 40,000 40,000 40,000 50,000 ,. . -------- --- -------- -------- ---------- -------- --------- ------ --------- -------- 'lUl'1\L ~J92~_ _}16,J25_ ---------- ___..!-4,55.!l_ _}02J 375_ __2.!l.!lJ 73.!l__ ------ ------ -------- --------- ------ 1983 09 19 . Page ~:~ 1984 BUDGET FOOD SERVICE ------------- Effective March 1, 1983, the Authority assumed total operational responsibility for the various food facilities at Conservation Areas and at Black Creek pioneer Village. previously the huthority had been under management agreement with a caterer for the operation of food facilities. . This section of the budget brings together the total food service program; net revenue is incorporated into the respective divisional operating budgets. . 1983.09.19 - .. Page ~.l. 1984 BUDGET FOOD SERVICE ----- !'E..Q9~__.!-?-9d S~..!vice_.:~erations PURPOSE: To provide food services at the refreshment stands, Half Way House, Kortright Centre for Conservation, the Conservation Field Centres, and for various Authority functions. 1984 OBJECTIVES - To provide a high quality food service that is attractive to all visitors. - To maximize net revenue from the food operation. . FUNDING --- Operating expenditures are funded from revenues. FIN~~l~_~ CO~N]'S: The net revenues will be used to offset operating costs in the areas where the revenues are produced OBJECTIVE CLASSIFICATIONS: Materials Contract Salaries Supplies & Services Financial & Wages Utili ties Maintenance & Rents Taxes EXJ>~..!l~~ TOTAL ------ ------ ----- $ 436,000 388,000 49,000 46,950 4,000 923,950 1983 09 19 1984 BlJDGET Page 1C:1. FOOO SERVICE Program Food Services* ----------- --------- ---------- ------------------------------------- --------------------------- 1984 BUDGET 1983 BUDGET 1983 ACTUALS lICTIVI TY --- ------------ ------------- -------- ---------- ------- ----- EXPENDI~_ REVENUE NET REVENUE* EXPENDITURE REVENUE NET REVENUE* EXPENDITURE REVENUE NET REVENUE $ c---r $"--- ---$"----- ----$-- ----$----- $ ----$-- --$"---- C.L.M. Division Refreshnent stands and Group Catering g5,.!l50 1J~J~OO l-JJ45O ~~.! 90.Q. ..!-~J.! OO.Q. ~l ,10.Q. 1. & E. Division COnservation FIeld Centres 378,300 378,300 259,417 259,417 Kortright Centre - Refreshment stand, Dining Roan and Group Catering 49,500 51,000 1,500 46,000 56,000 10,000 ~}1 ,.!l00 429 ,3E.Q. L5O~ }E~.!~ 17 }}.?.!Ji7.: io ,.!l00 H.S. Division iialTWay House 231,150 256,800 25 ,650 259,000 290,000 31,000 Refreshment stand 79,950 88,800 8,850 103,000 113,000 10,000 31l,10~ ~~,-;m)" ?4."5n1! }.?}.!~ 3E}.!3JOO ~~ Authority Group Catering 10,000 10,000 ------------------------- ---- ~---- ----- ---------- ----------- ---------- --------- ------------ ---------- TOTAL 923,950 JJ9 ,~.!l.!l__ __2~.!~~E-_ _ 83}.!}..!-!__ _JE.?.!~..!-L_ __J}Llil.!l__ ------- ------------ ------------------------ ---------- * Net revenue has been incorporated into divisional operating budgets 1983.09.19 B-339 SCHEDULE OlE 01 EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO , , 1984 ?ROGRAM AS PROPOSED IN PROJECT fOR EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO 1992 - 1984 .. THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY AUGUST, 1983 , B-340 EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO 1984 PROGRAM INTRODUCTION The purpose of this report is to outline the progress of the Erosion Control and Slope Stabilization Project for Metropolitan Toronto; which is designed to carry out the following (a) Major erosion control and slope stabilization remedial works conducted on a priority basis for watersheds draining in excess of 1,300 hectares, In view of the large number of sites requiring erosion control and bank stabilization work throughout Metropolitan Toronto, major remedial work is undertaken on a priority basis Using the original priority ratings listed in the MacLaren report of 1970 as a starting point, the rate of progress and deterioration of these sites is assessed annually ands ranked accordingly The priorities within this pool change continually in responce to the dynamics of the erosion process at each site, and therefore we strive to ameliorate the list with a steady ;nflux of technical data on site conditions The current top priorities are reflected in the work program for 1983 and the 'Pool of Priority Sites' which are found in respective sections of this report The current pool of priorities will be reviewed regularly during 1984 to accomodate any significant changes and the possible inclusion of new sites 1984 is the third year of the 1982 - 1984 Project for Erosion Control and Slope Stabilization in Metropolitan Toronto This project has budgeted $402,000 00 for the 1984 program 8-341 PROGRESS REPORT The following is a list at which major or minor remedial work was carried out between the inbeption of Project W C.- 60 - 'Erosion Control and Bank Stabilization in Metropolitan Toronto' in September, 1974, through the 'Interim Water and Related Land Management Project 1977 - 1981' and including the second year of the 1982 - 1984 Erosion Project. LOCATION WATERSHED WORK YEAR MAJOR REMEDIAL WORKS 90 Forestgrove Drive East Don River 1974 20-30 Islay Court Humber River 1974 39-41 Storer Drive Humber River 1974-1975 99-103 Burbank Drive Newtonbrook Ck 1974-1975 Hi Mount Drive Newtonbrook Ck' 1974-1975 8-10 King Maple Place Newtonbrook Ck 1974-1975 113 Burbank Drive Newtonbrook Ck 1975 14-22 Archway Crescent Humber River 1975 6 Wooden Heights Humber River 1975 45 Riverbank Drive and Vicinity Mimico Creek 1975 32-38 Bonnyview Drive Mimico Creek 1975-1976 37-ll3 Lakeland Drive West Humber 1976 Yvonne Public School Black Creek 1976 30-56 Grovetree Road West Humber 1976 95-97 Portico Drive East Branch 1976 Highland Ck 197-205 Sweeney Drive East Don River 1976 24 Stonegate Road Humber River 1976-1977 24-36 Westleigh Crescent Etobicoke Creek 1q76-1977 158-168 & 190-21~ Three Valleys Dr "East Don River 1976-1977 6-14 Sulkara Court East Don River 1978 Don Valley Drive Don River 1978 50-58 Stanwood Crescent Humber River 1978-1979 Enfie1d/Sunset/Jellicoe Vicinity Etobicoke Creek 1979 17-53 Riverview Heights Humber River 1979 10 Codeco Court - Phase I Don River 1980 35 Canyon A'fenue Don River 1979 31-39 Rivercove Drive Mimico Creek 1980 25-31 Alamosa Drive Don River 1980 Don Valley Parkway & Lawrence Don River 1980 10-14 Bruce Farm Drive Don River 1980-1981 39-47 Presley Avenue Don River 1980-1981 Grenview Boulevard Mimico Creek 1981 Rainbow Creek Parkway Development Don River 1981 9 & 11 Sulkara Court Don River 1981 Denison Road vicinity Humber River 1981 146-168 Humbervale Blvd & 835 Mimico Creek 1982 Royal York Road 45 & 55 Wynford Heights Crescent Don River 1982-1983 12-30 Beaucourt Road Mi:nico Creek 1983 Delroy Drive & Berl Ave Vicinity Mimico Creek Pro posed 1983 B-342 LOCATION WATERSHED WORK YEAR MINOR REMEDIAL WORKS 520 Markham Road Vicinity Highland Creek 1975 (Cedarbrook Retirement Home) 8ij-89 Greenbrook Drive Black Creek 1975 Klrkbradden Road Mimico Creek 1975 West Hill Collegiate Highland Creek 1975 Shoreham Court Black Creek 1975 27-31 Ladysbridge Drive West Branch Highland 1975-1976 N.W. of 56 Grovetree Road West Humber River 1975-1976 37-ij3 Mayall Avenue Black Creek 1976 79 Clearview Heights Black Creek 1976 S W of Shoreham Drive Bridge Black Creek 1976 Driftwood Court Black Creek 1976 75 Decarie Circle Mimico Creek 1976 ij Woodhaven Heights Humber River 1977 73 Van Dusen Boulevard Mimico Creek 1977 Donalda Club (8th Fwy) Don Ri ver 1978 Westleigh Crescent Vicinity Etobicoke Creek 1978 Scarlett Woods Golf Club Humber River 1978 22-26 Dunning Crescent Etobicoke Creek 1978 Kennedy Road Shopping Mall Don River 1978 Sheppard and Leslie Nursery Don River 1978 Leslie Street at Sheppard Rouge River 1978 Meadowvale Road Rouge River 1978 Zoo (Z-15) Rouge River 1978 Orchard Crescent Mimic'o Creek 1978 Forest Valley Day Camp Don River 1978 Beechgrove Drive Highland Creek 1979 Restwell Crescent . Don River 1979 Deanewood Crescent Vicinity Mimico Creek 1979 Dawes Road - 2 Sites Don River 1979 Tywn Rivers Bridge Rouge River 1979 Glen Rouge Trailer Camp Rouge River 1979 Beechgrove Drive - II Highland Creek 1980 Jason and Riverdale Humber River 1980 Warden & St Clair - 2 sites Don Ri ver 1980 Zoo - II Rouge River 1980 Glendon College Don River 1980 Scarlett Road & Eglinton Humber River 1980 Wllket Creek Don Rher 1980 Glen Rouge Trailer Camp Rouge River 1980 Sunnybrook Park Don River 1981 Donalda Golf Club Don River 1981 Glendon College Don River 1981 Bonnyview Drive II Mimico Creek 1981 West Side of Markham Rd (West Branch) Highland Creek 1981 Alderbrook Drive Don RIver 1981 West Dean Park (2 Sites) Mimico Creek 1982 Royal York Road Mimico Creek 1982 Waulron Street Etobicoke Creek 1982 Colonel Danforth Park Highland Creek 1982 Upwood Greenbelt Vicinity Black Creek 1982 Summary Major Works - 39 Minor Works - 50 Total Expenditure - $5,038,000 00 8-343 1984 WORK PROGRAM The following table lists the proposed work program for 1984 and the respective budget analysis ITEM ESTIMATED COST "lajor Remedial I Gwendolan Crescent 105,000 00 Major Remedial II Raymore Drive & Vicinity 204,000 00 Major Remedial III Moore-Vale Ravine 40,000 00 Major Remedial IV 14 Forest Path Court 42,000 00 Geotechnical Studies Alder Road & Stanwood Cras t11,000 00 .. .. TOTAL $402,000 00 nOTE Costs include expected revenue lJl POOL OF EROSION PRIOrtITY SITES 1984 - HETRO TORONTO I w "'- TE-CIINICAl "'- lOCATION WATERSHED MUNICIPALITY PRIOIlITY COMMENTS 100-104 Gwendolen Cres. West Don River North York 1 Problem: Slope failure and riverbank erosion Structure Affected Three residences Height of Bank 38m Length of Bank 75m 99-113 Weir Cres. Highland Ck. Scarborough 2 · Problem Slope failure Structures Affected: Nine residences and three pools Height of Bank 35m Length of Bank 150m Raymore Dr., Riverstone Humber River Etobicoke 3 Problem: Slope failure and riverbank erosion Dr , Vista Humber Dr. Structures Affected: Raymore Dr. and 14 properties Height of Bank 12m length of Bank 250m Moore-Vale Park Don River Toronto 4 Problem Slope failure and riverbank erosion Avenue Structures Affected: One Pede Bridge, one Pathway Height of Bank 5m Length of Bank 15m 14 Forest Path Court Humber River Etobicoke 5 Problem Slope failure and riverbank erosion Creek Structures Affected One residence, one pool Height of Bank 10m Length of Bank 23m 178 Alder Road Don River East York 6 Problem: Slope failure (Massey Ck ) Structures Affected: One Roadway Height of Bank 20m Length of Bank 100m 91 Forest Grove Dr. E. Don River North York 7 Problem: Slope failure and riverbank erosion Structures Affected One residence Height of Bank 22m Length of Bank 40m 14-20 Stanwood Cres. Humber River Etobicoke 8 Problem Slope failure and riverbank erosion . Structures Affected Four residences Height of Bank 20m Length of Bank 30m I , POOL Of EROSION PRIORITY SITES (1984 - YORK Page 2 --- L ...", S';;';--- ------- TECHNICAL LOCATION MUNICIPALITY PRIORITY COMMENTS Rowntree Mills Park Humber River North York 9 Problem Major riverbank erosion Structure Affected Park pathway and Parking lot Height of Bank 10m Length of Bank 115m 161 Riverside Drive Humber River Toronto 10 Problem Slope failure and riverbank erosion Structure Affected Roadway Height of Bank: 9m Leng.th of Bank 33m 1025 Scarlett Road Humber River Etobicoke 11' Problem Riverbank erosion (shale bank) Structure Affected One apartment, and garage . Height of Bank: 15m Leng th of Bank 35m 14 Neil son Dr N of Etobicoke Ck Etobicoke 12 Problem: Slope failure and riverbank erosion Dundas St W Structure Affected One high-rise apartment, pool Height of Bank: 17m Leng th of Bank 20m 19 fairglen Cres Humber River North York & 13 Problem Slope failure and riverbank erosion and Vicinity Bor of York Structure Affected One residence, one high-rise i Height of Bank 7m I Length of Bank 100m 48-50 Barkwin Dr Humber River Etobicoke 14 Problem Slope failure (fill material) I Structure Affected: Two residences, Two pools I Height of Bank: 25m Length of Bank: 30m Mouth of Highland Ck lIighland Ck Scarborough 15 I Pr.oblem Slope failure, riverbank erosion Structure Affected CNR Tra1n Bridge Hetght of Bank 15m Length of Bank 20m I lJl I w ~ Ul OJ I w ~ 0\ , POOL OF EROSION PRIORITY SITES 1984 - METRO TORONTO Page 3 .. ~ TECHNICALI LOCATION WATERSHED I MUNICIPALITY PRIORITY COMMENTS 1 i , Sewell Rd at Rouge River I Scarborough 16 : Problem Slope failure and riverbank erosion Finch Avenue I Structure Affected roadway ! Height of Bank 18m I Length of Bank 20m Van Dusen Blvd Mimico Cr Etobicoke 17- I Problem Toe protection failure I Structure Affected Two residences I Height of Bank 2 5m Leng th of Bank 30m \ 18 I Slope failure, riverbank erosion Serena Gundy W Don River North York Problem Park i Structure Affected one ped bridge, one pathway Height of Bank 3m Length of Bank 15m Eccleston Dr E Don River North York 19 Problem Slope failure, riverbank erosion I Structure Affected Height of Bank 20m Length of Bank 30m I 92-94 Celeste Dr W Highland Scal'borough 20. i Problem Slope failure, riverbank erosion Creek Structure Affected Two residences, one pool Height of Bank 35m . I I Length of Bank 32m , B-347 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF PEEL 984 ?ROGRAM AS PROPOSED IN PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUINICIPALITY OF PEEL 1982 - 1984 THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY AUGUST, 1933 B-348 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF PEEL 1984 PROGRAM INTRODUCTION Given the number of sites requiring erosion control and slope stabilization work throughout the Region of Peel, major remedial work is undertaken on a priority basis The original priority ratings listed in the Erosion Inventory and Priorities Study of 1977 were used as a starting point in assessing the rate of progress and deterioration of erosion sites A 'Pool of Erosion Sites' was prepared from this study and is continually updated with new sites experiencing erosion problems The technical priorities within this pool are reviewed on a regular basis to reflect the dynamics of the erosion process at each specific site I The annual work program which was formulated on a priority basis using the 1984 'Pool 0, Erosion Sites', and the sites bearing high priority ratings are listed in the respective sections of this report It should be noted that in the Region of Peel, the municipal share of the costs of erosion control program are passed on to the local municipalities As a result, the erosion priority pool is divided to coincide with the three local municipalities within the Region of Peel, namely the Town of Caledon, the City of Brampton and the City of Mississauga and conseque~ly, the relativl priorities are not given on a regional basis 1984 is the third year of the 1982 - 1984 Project for Erosion Control and Slope Stabilization in the Regional Municipality of Peel The budget for the 1984 Work Program is $18,000 00 . . 8-349 PROGRESS REPORT The following is a list of sites at which remedial work was carried out from the inception of the Interim Water and Related Land Management Project, 1919-1981 and for the first two years of the 1982 - 1984 Erosion Project LOCATION WATERSHED WORK YEAR 138 King Street Vicinity - Bolton Humber River 1919 (Town of Caledon) Sherway Drive, Mississauga Etobicoke Creek 1919 Wildwood Park, Mississauga Mimico Creek 1919 Mill Street, 8rampton Etobicoke Creek 1980 Ponytail Drive & Steepbank Cres , Etobicoke Creek 1980-1981 (Vicinity, Mississauga) 10 Beamish, Wildfield, (Brampton) West Humber River 1980 (Lindsay Creek) Centennial ~oad - Bolton Humber River 1981 (Caledon) Legion Street near Derry Road Mimico Creek 1982 (Mississauga) Charola1s Blvd , (Brampton) Etobicoke Creek 1982 Albert and John St (Bolton) Humber River Proposed 1983 93 Scott Street (Brampton) Etobicoke Creek Pro posed 1984 B-350 1984 WORK PROGRAM The Regional Municipality of Peel The following table lists the proposed work program for 1984 and the respective budget analysis ITEM ESTIMATED COST i) Survey and Legal $2,000 00 ii) Major Remedial I I 93 Scott Street, Brampton 16,000 00 . I . I I I TOTAL $18,000 00 I .- I ! I NOTE Costs include expected revenue . POOL OF EROSION PRIORITY SITES 198q - PEEL (BRAHPTON) TECIINICAL LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS --- 93 Scott Street Etobicoke Ck Brampton 1 Problem Slope failure and riverbank erosion Structure Affected Private property Height of Bank II 8m Length of Bank 35m WH-1Q2, Beamish 'Court West Humber Brampton 2 prob! em Slope failure and river bank erosion Wild field River Structure affected Private property Height of Bank 8m Length of Bank: 15m . lJl I w Ul ...... --- -- OJ I w VI IV POOL OF EROSION PRIOHITY SITES 198~ - PEEL (MISSISSAUGA) TECHNICAL LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS . 2130 Dund as St West Etobicoke Ck Mississauga 1 Problem Slope failure and riverbank erosion . - Structure Affected Factory parking lots Height of Bank 900 Length of Bank 7000 6~69 Netherhart Road Etobicoke Ck Mississauga 2 Problem Slope failure and river bank erosion Structure affected Storage area behind industrial building Height of Bank: 12m Length of Bank ~Om . . POOL OF EROSION PRIORITY SITES 1984 - PEEL (CALEDON) ---------.---------.-- _._------ --- TECHIIICAL LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS ._-- ------_.- -.-----_._- ~--- ---- ------ Albert and John Street Humber River Caledon Problem Riverbank erosion Structure Affected Eight residences Height of Bank 2 9m Length of Bank 100m . I I I I I i III I w VI w B-354 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF YORK . 1984 PROGRAM . AS PROPOSED IN PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUINICIPALITY OF YORK 1982 - 1984 " THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY AUGUST, 1983 . B-355 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF YORK 1984 PROGRAM INTRODUCTION Given the number of sites requiring erosion control and slope stabilization work throughout the Region of York, major remedial work is undertaken on a priority basis The original priority ratings listed in the Erosion Inventory and Priorities Study of 1977 were used as a starting point in assessing the rate of progress and deterioration of erosion sites A 'Pool of Erosion Sites' was prepared from this study and is continually updated with new sites experiencing erosion problems The technical priorities within this pool are reviewed on a regular basis to reflect the dynamics of the erosion process at each specific site The annual wor~ program which was formulated on a priority basis using the 1984 'Pool of Erosion Sites', and the sites bearing high priority ratings are listed in the respective sections of this report . . 1984 is the third year of the 19~2 - 1984 Project for Erosion Control and Slope Stabilizacion in the Regional Municipality of York The budget ~r the 1984 Work Program is ~20,000 00 B-356 PROGRESS REPORT The following is a list of sites at which remedial work was carried out, from the inception of The Interim Water and Related Land Management Project, 1979 - 1981 and for the first two years of the 1982-1984 Erosion Project LOCATION WATERSHED WORK YEAR 7374 Kipling Avenue, Woodbridge Humber River 1979 (Rainbow Creek) , 7440 Kipling Avenue, Woodbridge Humber River 1979 (Rainbow Creek) 8240 Pine Valley Drive, Woodbridge Humber River 1979-1980 14th Avenue, Markham Rouge River 1979-1980 19th Avenue, Markham Rouge River 1919 King Township and Town of C~edon Line Humber River 1979 . (Cold Creek) Cedar Grove Community Centre Rouge River 1980 146 Riverside Drive, Woodbridge Humber River 1980 Postwood Lane, Markham Don River 1980 Pine Grove Vicinity Humber River 1980 ~orth Don Sewage Treatment Plant Don River 1981 Kennedy Road West, Markham Don River 1981 NObleton, Lot 5, Con 8 (Cole Farm) Humber River 1982 5760 Kirby Sideroad, Humber River 1982-1983 , 8-357 1984 WORK PROGRAM The Regional Municipality of York The following table lists the proposed work program for 1984 and the respective budget analysis I ITEM I ESTIMATED COST I ! I I i ! I 1) Survey and Legal $2,000 00 ! . I I ! ii) Major Remedial I I i I I I House adjacent to 8uttonville I $18,000 00 I I Golf Club I I i I I I I , I I TOTAL $20,000 00 i I ! I NOTE The costs include expected revenue OJ I w VI POOL OF EROSION PRIORITY SITES 1984 - YORK CD TECHNICAL LOCA TION WATERSHED MUNICIPALITY PRIORITY COMMENTS - House adjacent to Rouge River Markham 1 Problem Riverbank erosion Buttonville Golf Club Structure Affected One house Height of Bank 10m Length of Bank 15m 9825 Hwy 27 Klienburg Humber River Vaughan 2 Problem Riverbank erosion Structu~e Affected One house and shed Height of Bank 1 5m Length of Bank 100m R R 13. Woodbridge Humber River Vaughan 3 Problem Riverbank erosion Structure Affected One pool and one tennis court Height of Bank: 4 8m Length of Bank 35m Warden Avenue at - Major Mackenzie Dr Rouge River Markham 4 Problem Riverbank erosion and slope failure Structure Affected one residence Height of Bank 5m Length of Bank 30m . 7195 McCowan Road Rouge River Markham 5 Problem Riverbank erosion Structure Affected One house Height of Bank 5m Length of Bank 6m . B-359 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF DURHAM - 1984 PROGRAM AS PROPOSED IN PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION' IN THE REGIONAL MUINICIPALITY OF DURHAM 1982 - 1984 THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY AUGUST, 1983 , B-360 EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF DURHAM 1984 PROGRAM INTRODUCTION. Given the number of sites requiring erosion control and slope stabilization work throughout the Region of Durham, major remedial work is undertaken on a priority basis The original priority ratingsltisted in the Erosion Inventory and Priorities Study of 1977 were used as a starting point in assessing the rate of progress and deterioration of erosion sites A 'Pool - of Erosion Sites' was prepared from this study and is continually updated with new sites experiencing erosion problems The technical priorities within this pool are reviewed on a regular basis to reflect the dynamics of the erosion process at each specific site The annual work program which was formulated on a priority basis using the 1984 'Pool of Erosion Sites', and the sites bearing high priority ratings . are listed in the respective sections of this report - , 1984 is the third year of the 1982 - 1Q84 Project for Erosion Control and Slope Stabilization in the Regional Municipality of Durham The budget for the 1984 Work Program is $5,000 00 B-36l PROGRESS REPORT The following is a list of sites at which remedial work was carried out from the inception of the Interim Water and Related Land Management proj ect , 1979-1981 and for the first two years of the 1982 - 1984 Erosion Project LOCATION WATERSHED- WORK YEAR 16 Elizabeth Street, Ajax Duffin Creek 1979 558 Pine Ridge Road, Pickering Rouge River 1979 Hockey Ranch, Pickering Duffin Creek 1980 Woodgrange Avenue, Pickering Rouge River 1931 Al tona Road, Pickering Petticoat Creek 1981 Side road 30 Olhitevale) Duffil\ Creek 19~2 B-362 1984 WORK PROGRAM The Regional Municipality of Durham The following table lists the proposed work program for 1984 and the respective budget analysis . I ITEM EST'IMATED 1) Remed ial I Green River Park $5,000 00 , TOTAL $5,000 00 . . POOL OF EROSION PRIORITY SITES 1984 - DURHAM - TECHtlICAI - LOCATION WATERSHED MUNICIPALITY PRJOH1TY COMMENTS ------ I Green River Park, 0-16 West Duffin Pickering 1 Problem Riverbank erosion Creek Structure Affected One outdoor dining pavillion Height of Bank 6.5m Length of Bank gOm 1840 Altona Road, D-15 Petticoat Pickering 2 Problem Riverbank erosion Creek Structures Affected One residence and one pool Height of Bank 1 1m Length of Bank 20m 1436 Highbush Trail Petticoat Pickering 3 Problem Riverbank erosion Creek structures Affected One garage Height of Bank 5 5m Length of Bank 20m Brock Road at Finch Duffin Creek Pickering 4 Problem Riverbank erosion Avenue Structures Affected One shed , Height of Bank 1 5m Length of Bank 20m ~ CD I w 0'\ w '" .. , THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY DIVI~IONAL EXPENDITURE SUMMARY FOR TilE FERIOD JULY 1, 19133 to JULY 31, 1933 Expenditures Current Year to Funds , Dur1gc t Honth Date Available Spent , ~ ~ $ $ , Finance & Admin.(inc1. L~nd Acq.) 3,186,465 244,407 1,563,364 1,623,101 49.1 Water Resourc~ - Flood Co~trol 2,911,389 114,473 1,101,789 1,809,600 37.9 Water Resourc~ - Waterfront 2,325,000 130,337 711,023 1,613,977 30.6 Conservation Land Management 3, 54ft ,345 340,786 2,034 ,392 1,513,953 57.3 Information , Education 2,426,623 265,045 1,247,481 1,179,142 51.4 Historical Si~es 3,912,822 - 153,308 1,102,606 2,910,216 28.2 Vehicle' Equipment - CapItal Acq. 290,730 2,306 121,132 159,598 43.1 , SUB-TOTAr. 18,591,374 1,250,662 7,8111,787 10,709,587 42.4 Vehicle & Equipment - Operations -- 17,689 133,221 -- -- ! Special Proj€cts -- 92,754 429,283 -- -- C.O.E.D. 1983/84 2,123,808 166,332 488,821 1,634,987 23.0 Food ServIces 833,317 1<28,559 408,140 345,177 58.6 r... TOTAL 21,5413,499 1,675,995 9,420,252 12,689,751 43.7 iii ...J :J ............~........._B__e....._..a.e_.c...........m................ ..,. 0 \D iii M :J: I U III lJ) , ll) It) ,.., I ro THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY DIVISIONAL EXPENDITURE SUMMARY FOR THE PERIOD AUGUST 1, 1983 to SEPTEMBER 4, 1983 .. _~XJ'~!ljL~u..!~__ Current Yea r to Funds % BU~~..!:. Month Date Available ~J>~!l..!:. ---r-- ---r-- ----T-- Finance & Admin.(inc1. Land Acq.) 3,186,465 184,101 1,747,465 1,439,000 54.8 Water Resource - Flood Control 2,911,389 406,399 1,508,188 1,403,201 51 8 Water Resource - Waterfront 2,325,000 195,757 906,780 1,418,220 39.0 Conservation Land Management 3,548,345 407,573 2,441,965 1,106,380 68 8 Information & Education 2,426,623 166,159 1,413,640 1,012,983 58.3 Historical sites 3,912,822 197,580 1,300,186 2,612,636 33 2 Vehicle & Equipment - Capital Acq. 280,730 (327) 120,805 159,925 43 0 ---------------------------------------------------------------------- SUB-TOTAL 18,591,374 1,557,242 9,439,029 9,152,345 50.8 Vehicle & Equipment - Operations -- 31,984 165,205 Special Projects -- 80,835 509,118 C.O.E.D. 1983/84 2,123,808 202,685 691,506 1,432,302 32-6 Food Services 833,317 118,239 606,379 226,938 72 8 ---------------------------------------------------------------------- TOTAL 21,548,499 1,990,985 11,411,237 10,811,585 53.0 ============================================:========================== , 1983.09.14 \ . Ct.. B-366 , the metropolitan toronto and region conservation authority minutes REPORT #17/83 EXECUTIVE COMMITTEE 19-0CTOBER-1983 #17/83 The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview, on Wednesday,19 October, 1983 PRESENT FOR THE HEARING Chairman Mrs. F.E Gel! Members W G. Barber Mrs L. Hancey H.C. Lawrie S A Macpherson (For M W H. Biggar) F R Perkins J S. Scott Mrs. N Stoner Following the roll call, the meeting adjourned to hold a hearing re Alliance-Rockcliffe Limited City of Mississauga Etobicoke Creek Watershed PRESENT FOR THE MEETING Chairman Mrs F.E Gel! Vice-Chairman E V. Kolb Members W G Barber E Fulton Mrs. L Hancey H C Lawrie S A Macpherson Ms S Nimmo (For M W H Biggar) F R Perkins J S Scott Mrs N. Stoner ABSENT Member M W H Biggar MINUTES Res #278 Moved by: Mrs N Stoner Seconded by H.C Lawrie THAT the Minutes of Meeting #16/83 be approved CARRIED SECTION I FOR CONSIDERATION l. ENVIRONMENTALLY SIGNIFICANT AREAS STUDY (1982) Res #279 Moved by H.C. Lawrie Seconded by Mrs N. Stoner THAT the staff report (together with the Summary - Environmentally Significant Areas Study, 1982, appended as Schedule "A" of these Minutes) be received, AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #2 of Report #2/83 of the Conservation Land Management Advisory Board, as amended and set forth herein, be approved B-367 -2- #4 THAT the concept of environmentally significant areas be recognized as a component of The Metropolitan Toronto and Region Conservation Authority's implementation of its mandate, THAT the Watershed Plan, in particular the Land Acquisition Program and the Conservation Land Management Program, be amended to incorporate the ESAs currently identified and the concepts of ESA management, THAT environmental reviews be undertaken for all proposed MTRCA works which may impact ESAs and, where potential impacts are identified, the means of mitigating these potential impacts be addressed, THAT individual management plans be prepared for ESAs on land owned and managed by the MTRCA. Other public agencies who manage MTRCA land or own and manage their own land be requested to prepare individual ESA management plans, with the assistance o~ the MTRCA or other appropriate agencies, THAT management guidelines be prepared by the MTRCA explaining the significance of ecological systems (i e marsh, forests, etc ) , and identifying the benefits/disbenefits of various actions, THAT a strategy be prepared within the Community Relations Program to inform and/or educate the general public and private landowners con- cerning ESAs, THAT all master drainage planning undertaken by the MTRCA or in con- junction with the municipalities, other agencies, or developers, recognize and incorporate ESAs, THAT the MTRCA utilize ESA information as part of the data base for the municipal plan review process, THAT the regulatory powers of the MTRCA, under Section 28 of the Conservation Authorities Act, with respect to the placing or dumping of fill, be investigated as to their potential to include those ESAs not currently regulated, THAT the ESA data base be maintained and defined in conjunction with the MTRCA's member municipalities, the Province of Ontario, affected agencies, special interest groups, and others, AND FURTHER THAT copies of the Environmentally Significant Areas Study (1982) be forwarded to the Authority's member and local municipalities and other appropriate government agencies and interest groups as a background resource document CARRIED. SECTION II FOR INFORMATION 2 BLACK CREEK PIONEER VILLAGE -Operating Statement Res #280 Moved by Mrs N Stoner Seconded by Ms S Nimmo THAT no change in the operating hours of Black Creek Pioneer Village be made for the remainder of 1983 CARRIED. 3 CORRESPONDENCE Mr W A McLean, Acting General Manager, reported receipt of the following correspondence (a) Notice from the Grand River Conservation Authority concerning the celebration of the Tenth Anniversary of the Opening of their Administration Building with tours, etc on Sunday, October 23 -3- B-368 (b) Letter dated 1983 09 12 from D Cherry, Administrator, MNR Special Employment Program, concerning a Cabinet Minute informing the Ministry that $1 0 million has been allocated for a mineral exploration program in the Sudbury area No additional allocation of funds will be received by the remaining sectors (c) Letter dated October 7, 1983, from the Deputy Commissioner of Parks, The Municipality of Metropolitan Toronto concerning the Project for the Acquisition of the United Ceramics Ltd (formerly the Toronto Brick Company Ltd ) advising that. "the project is dependent on a major contribution from the Provincial Government and, to this point in time, while discussions have taken place, no definitive statement has been obtained with respect to any commitment to such acquisition In this context it is not appropriate to process the Project to Council. . The matter is, therefore, held in abeyance at this time ." DECLARATIONS MS. S. NIMMO declared a Conflict of Interest concerning correspondence item (c) above since a client of a firm with which she is associated is interested in this acquisition 4 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #281 Moved by Mrs N Stoner Seconded by SA. Macpherson THAT the applications listed herein as A(l) and A(3) be approved, subject to the conditions contained in the reports CARRIED. A(l) Bramalea Limited To enlarge culvert under Highway #7, east of Dixie Road, City of Brampton (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit Drawing #822l-B-S, prepared by Paul Theil Associates Limited and dated June 1983 A(2) - Application of Scarborough Centenary Hospital - WITHDRAWN BY APPLICANT A(3) The Municipality of Metropolitan Toronto Roads & Traffic Department To construct storm sewer outfall into the Highland Creek, west bank, under Kingston Road In accordance with the following plans and documents, which shall form part of the permit (a) All areas disturbed during construction being restored to the satisfaction of the Authority. (b) All work being carried out in accordance with drawings sub- mitted for Metro Contract #RSO-83 5 WATER & RELATED LAND MANAGEMENT PROJECT FLOOD WARNING & FORECASTING SYSTEM -Portable Data Acquisition Terminal Res #282 Moved by Mrs N Stoner Seconded by E V Kolb THAT the purchase of a Portable Data Acquisition Terminal for the Flood Warning & Forecasting System, at a cost not to exceed $1,200 00, be approved CARRIED .- B-369 -4- 6 WATERFRONT PROJECT SCARBOROUGH SECTOR, FISHLEIGH SITE -Contract 83 02 - Parking Lot Construction The following tenders were received for improvements to the parking area at the former Fishleigh Filtration Plant property, including construction of concrete curbs, installation of gravel base and asphalt paving of the parking lot extension, and asphalt re-surfacing of the existing parking area: COMPANY NAME TENDERED AMOUNT Associated Paving Co Ltd $19,738 00 D. Crupi & Sons Limited $20,995.00 Empire Paving Limited $24,640 00 Res #283 Moved by H C Lawrie Seconded by: W.G. Barber THAT Contract #83-02 for site paving at the Fishleigh site, Scarborough Sector, Waterfront Project, be awarded to the low bidder, Associated Paving Company Limited, in the amount of $19,738 00. CARRIED. 7 SHORELINE MANAGEMENT PROGRAM SCARBOROUGH SECTOR, SOUTH MARINE DRIVE -Contract 83-03 - Quotations for Quarry Stone The following quotations were received for the supply and delivery of rip rap stone and armour stone for shoreline protective work at the above location COMPANY NAME Armour Stone Rip Rap Stone Price-per-tonne Price per tonne By Trailers By Tandems 1 Canada Crushed Stone $13 00 $11 60 No Bid 2 Nelson Aggregate Ltd $14 35 $11 30 $11 90 3 Limestone Quarries $15.15 No Bid No Bid 4 Indusmin Ltd $16 40 $12 20 $12 75 5 Vineland Quarries No Bid $12 00 No Bid Estimated quantities of stone required are 3,500 tonnes of 3 - 5 tonne armour stone, and 1,950 tonnes of 250 mm to 600 mm rip rap stone Res #284 Moved by E. Fulton Seconded by S A Macpherson THAT the following quotations be accepted for the supply and delivery of quarry stone for shoreline protective work along South Marine Drive, Scarborough, at a total cost of $67,535.00 for the estimated quantity Canada Crushed Stone arm our stone at $13 00 a tonne Nelson Aggregate Ltd rip rap stone at $11 30 a tonne by tractor trailers or $11 90 a tonne by tandem trucks CARRIED 8 SHORELINE MANAGEMENT PROGRAM SCARBOROUGH SECTOR, FALLINGBROOK DRIVE -Contract 83-04 - Quotations for Quarry Stone The following quotations were received for the supply and delivery of rip rap stone and armour stone for shoreline protective work at the above location , -5- B-370 COMPANY NAME Armour Stone Rip Rap Stone Price per tonne Price per tonne 1 Canada Crushed Stone $13 .00 No Bid 2. Nelson Aggregate Ltd $14 35 $11 32 3 Limestone Quarries $15 15 No Bid 4 Indusmin Ltd $15.95 $12.70 5 Vineland Quarries No Bid $12 00* *(By trailers only) Estimated quantities of stone required are 6,000 tonnes of 3 - 5 tonne armour stone, and 2,000 tonnes of 250 mm to 600 mm rip rap stone Res #285 Moved by Mrs N Stoner Seconded by E. Fulton THAT the following quotations be accepted for the supply and delivery of quarry stone for shoreline protective work along Fallingbrook Drive, Scarborough, at a total cost of $100,640 00 for the estimated quantity Canada Crushed Stone armour stone at $13 00 a tonne Nelson Aggregate Ltd rip rap stone at $11 32 a tonne CARRIED. 9 HISTORICAL PLAQUE Res. #286 Moved by W.G. Barber Seconded by F R Perkins THAT the Town of Vaughan be requested to consider the erection of a plaque commemorating the original Woodbridge office site of The Metropolitan Toronto and Region Conservation Authority CARRIED 10 AUTHORITY AND STAFF ANNUAL DINNERS, AND CHILDREN'S CHRISTMAS PARTY Res #287 Moved by H C Lawrie Seconded by S A Macpherson THAT the Secretary-Treasurer be authorized and directed to make such arrangements as may be necessary for Members' 27th Annual Dinner - to be held Sunday, December 4, 1983, at the Boyd Conservation Field Centre, Staff Annual Dinner - to be held Saturday, December 17, 1983, at the Shrine Temple, Children's Christmas Party - to be held Saturday, December 10, 1983, in the Woodbridge Public School auditorium AND FURTHER THAT any expenses incurred over and above those normally recovered from the Members and staff be paid by the Authority CARRIED 11 KORTRIGHT CENTRE FOR CONSERVATION -Sheltered Patio Eating Area Res #288 Moved by Mrs L Hancey Seconded by Ms S Nimmo THAT the firm of Shore Tilbe Henschel Irwin Peters, Architects & Engineers, be awarded the contract fer the working drawings for the sheltered patio eating area at the Kortright Centre for Conservation, for a fee of $6,250 00 CARRIED B-371 -6- 12 DECISION OF HEARING -Al11ance-Rockcliffe Limited City of Mississauga Etobicoke Creek Watershed Res #289 Moved by J S Scott Seconded by Mrs N. Stoner THAT the application of Alliance-Rockcliffe Limited, in accordance with Ontario Regulation 170, for permission to construct structures in the flood plain of the Etobicoke Creek, City of Mississauga, be refused for the following reasons That the application, as submitted, would affect the control of flooding and the conservation of land CARRIED. 13 NEW BUSINESS The Chairman announced that she has been informed by the Cabinet Office that the Lieutenant-Governor in Council has appointed seven persons to the Board of Governors of the Guild Inn, and that one of these is Mr W E Jones. The Vice-Chairman expressed his appreciation to all staff responsible for the Official Opening arrangements for the Bolton Channel Mrs Gell reminded the Members that the Executive meeting of November 2nd will be held at 1 00 pm., and commence with lunch at 12 00 noon The Sod Turning ceremony by the Honourable Susan Fish for the Black Creek Pioneer Village Visitor Centre will start at 3 30 P m on that date 14 TERMINATION On motion, the meeting terminated at 11 00 a.m , October 19, 1983 Florence E Gell W E. Jones Chairman Secretary-Treasurer KC B-372 SCHEDULE "A" SUMMARY ENVIRONMENTALLY SIGNIFICANT AREAS STUDY 1982 THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY : B-373 SUMMARY ENVIRONMENTALLY SIGNIFICANT AREAS STUDY In 1978, a study of Environmentally Significant Areas was initiated by staff of The Metropolitan Toronto and Region Conservation Authority (MTRCA) The purpose of the study was to identify ESAs and to suggest direction for their management. The study comprises four phases (FIGURE 1). The first three phases were completed over a period of four years (FIGURE 2) Phase I involved the review of other ESA studies and existing information sources to prepare a preliminary list of candidate significant areas. Criteria for the identification of ESAs were also developed. Phase II extended over the following three summers for inventory of the candidate areas At the completion of each field season, an interim report was prepared identifying areas considered for ESA designation. The completion of the third interim report marked the onset of Phase III. This phase involved the assessment and designation of ESAs based on the interim reports and fine tuning of the selection criteria. Phase IV will be an ongoing exercise of updating ESA information. This updating will permit the designation of new ESAs, the deletion of those which no longer fulfill the selection criteria or the refinement of others Due to the overall size of the MTRCA's jurisdiction and in consideration of time, staff availability and funds, the study area was limited to the inclusion of major natural resource areas only These resource areas were: - the Oak Ridges Morraine (including the Niagara Escarpment) - the primary valley systems (areas draining 1300 ha or greater), and - the Lake Ontario Waterfront As a result, the current ESA study should be considered as a first step. Additional studies beyond the bounds of the current study are possible in the future In th interest of consistency, it is suggested that any such additional studies by other agencies or groups use the selection criteria and interpretations established by the MTRCA ESA Criteria In compiling criteria for the selection of ESAs, the MTRCA reviewed similar studies throughout the Province The selection criteria used are as follows Criterion 1 The area represents a distinctive and unusual landform within the MTRCA region, Ontario or Canada. B-374 COI.LECT AND REVIEW EXISTING PHASE I DATAIINFORMATION LOCAL AGENCIES INTEREST GROuPs POlSONAL INTERVIEWS . PIIEYIOUS STUDIES ( _ZE MTERCOURSES -- -- --- ----- -------- PHASE II ------- ------ PHASE m - --- PHASE 17 FlOW CHART -~ FIG. 1 - ,--.. ') - III I W -..I VI I LEGEND ...... OEVElDPINO ZONE 19" --- ::'~~E>HEADWAT[ll ZONE IS80 0 '- ~ , I , - PRIUARY \!lU.EYS > DEVElDPEO ZDNE '981 . , , ~ 0 6",_ WATERfRONT ENVIRONMENTALl..Y SIGNIFICANT TIME FRAME FIG. 2 ~ the metropolitan toronto and region AREAS STUDY conservation authority B-376 - 2 - Criterion 2 The ecological function of the area contributes significantly to the healthy maintenance of a natural system beyond its boundaries: (a) the area serves as a water storage area or high soil permeability area, or (b) the area helps to maintain or link significant natural biological systems, or (c) the area is essential for the healthy continuation of a significant species and/or significant population or concentration of species Criterion 3 The habitat and/or biological communities are identified as exceptional and/or of high quality within the MTRCA region, Ontario ~r Canada Criterion 4 The area contains an ecosystem which has limited representation in the MTRCA region, Ontario or Canada and/or is a small remnant of a particular habitat which has virtually disappeared within the region Criterion 5 The area has an unusually high diversity of biological communities and/or species Criterion 6 The area provides habitat for indigenous species that are rare and/or endangered regionally (MTRCA), provincially and nationally. Criterion 7 The area is sufficiently large to afford habitat for species which require extensive blocks of suitable habitat. The study was approached from a biophysical viewpoint, with emphasis on geomorphological features, surface hydrology, and terrestrial and aquatic ecology The geomorphological component provided information on significant or unusual landforms for the region The surficial hydrology provided information on areas of high soil permeability and surficial water storage areas Terrestrial and aquatic ecology provided data on areas containing rare and significant species or population of species, habitats and ecosystems, and areas that are essential to maintaining biological continuity Approximately 126 ESAs were identified as a result of the study These ESAs and the criteria they fulfill have been identified on the attached summary Table 1 TABLE 1 CD ENVIRONMENTALLY SIGNIFICANT AREAS BY MUNICIPALITY I w -.J -.J ESA Criter1a Fulfilled Area Municipali tv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) ownership . COUNTY OF DUFFER IN Township of 43 Humber River Canada Co Forest X X X X 15 78 pr Mono COUNTY OF SIMCOE Township of 44 Humber River Lee Area X X X 134 93 pr Adjala 45* Humber River Simcoe-Albion Forest X X X X 214 32 A, pr REGION OF PEEL Town of 33 Humber River Hanna-Donaldson Area X X X 39 72 pr Caledon 34 Humber River Vance-Donaldson Area X X 42.94 A, pr 35 Humber River Centreville Creek Area X 150 97 pr 36 Humber River Caledon East Complex X X X 175 98 pr 37 Humber River Caledon East Forest X X X 54 17 pr 38 Humber River McCarthy Area X 9 33 pr 39 Humber River Evans-Milburn Area X X 118 89 pr 40 Humber River Caledon Hills Complex X X X X X X X 1332 82 A, pr 41 Humber River Sleswick Complex X X X X X X 266.82 A, pr 42 Humber River O'Laughlin Area X X X X 45 43 A, pr 45* Humber River Simcoe-Albion Forest X X X X 214 32 A, pr 46 Humber River Coolaghan's Forest X X X X X 163 53 pr 47 Humber River Palgrave Cedar Forest X 10.20 pr 48 Humber River Lonicera Site X X 1.09 A 49 Humber River Tuckerman's Site X 2 09 A 50 Humber River Centreville Creek Complex X X 22 19 I A, Pr ,. Tl - 2 ESA Criteria Fulfilled Area Municipalitv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnershio 51 Humber River Walton's Forest X X 32 25 pr 52 Humber Ri ver Castlederg X 42 09 pr 53 Humber River Callay-Monkman Area X 17.47 Pr City of Brampton 3 Etobicoke Cr Heart Lake Woodlands X X X X 53 16 A City of Mississauga 1* Etobicoke Cr Silverthorn Area X 0.96 A, Pr, P 2 Etobicoke Cr Etobicoke Twinleaf X 12 67 A REGION OF YORK Township of 54 Humber River Cold Creek Swamp X X X 46.89 A King 55 Humber River pogonia Fen X X X 1.67 pr 56 Humber River King-Vaughan Forest X X X 50. 72 P, Pr 57 Humber River King Forest X X 59 29 pr 58 Humber River Spiranthes Site X 1 02 Pr Town of 15 Humber River Woodbridge Cut X o 49 P Vaughan 16 Humber River Clarence Street Forest X X o 63 P, Pr 17 Humber River Elder Mills Forest X X X 68 67 pr 18 Humber River Smith's Beech Forest X 5 74 Pr 19 Humber River pine Grove Forest X X 8 94 A, Pr 20 Humber River Boyd's Rock Cress X o 51 A 21 Humber River Pine Valley Forest X X 36 69 A, Pr 22 Humber River Carex Peckii Area No 1 X o 80 pr 23 Humber River Carex Peckii Area No 2 X 0.54 A 24 Humber River Graham's Forest X X X 3 54 pr 25 Humber River Graham's Forest COmplex X X 12.42 A 26 Humber River McLean's Forest X X 11 94 pr 27 Humber River Graham's Woods X X 6 76 A 28 Humber River Kortright Area X X X X 81. 97 A 29 Humber River Boyd Forest X X 11 62 A 30 Humber River McFayden Forest X X X 11. 60 A, Pr 31 Humber River Sprengel's Area X X 12 38 A, pr 32 Humber River Glassco X X X 58 97 A. P 56 Humber River King-Vaughan Forest X X X 50 72 P, Pr 72 Don Ri ver Cook's Area X X 14.71 pr CD I 73 Don River McGill Area X X 115.43 pr w X ~ CD Tl - 3 CD I w ~ ESA Criteria Fulfilled Area \0 Municipality No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership Town of 59 Humber River Bond Lake Bog X X X 4.10 Pr Riclunond Hill 60 Humber River Forester Marsh X 5 97 pr 71 Don River Richvale Forest X X 19.21 Pr 90 Rouge River Jefferson Forest X X 20 65 Pr 91 Rouge River Wilcox Lake Bog X X X 40.90 pr 92* Rouge River Simeon Lake Forest X X X 197.88 pr Complex 93* Rouge River Bloomington Wetlands X X 17 83 pr Town of Whitchurch- 92* Rouge River Simeon Lake Forest X X X 197 88 pr Stouffvile Complex 93* Rouge River Bloomington Wetlands X X 17.83 Pr 107 Duffin Creek Stouffville Forest X 11. 32 A, P Town of Markham 89 Rouge River Unionville Marsh X 1.82 Pr METROPOLITAN TORONTO Borough of 1* Etobicoke Cr Silverthorn Area X o 96 A, Pr, P Etobicoke 4 Humber River Sassafras Site X 0.74 P 5* Humber River Humber River Marshes X X X 48.25 A, Pr, P 6 Humber River Home Smith Area X X 3 26 Pr 8 Humber River Lambton Woods X X X 23 43 A, P, Pr 9 Humber River Chapman Valley X X 17.80 P. Pr 10 Humber River Garland Park X 1.20 A, P 11 Humber River Humber College Arb. X 3 60 A 13 Humber River Thistletown Oxbow X 9 23 A, P, Pr City of 5* Humber River Humber River Marshes X X X 48 25 A, Pr, P Toronto 114 Waterfront High Park Area X X X X X 27 51 P 115 Waterfront Hanlan Area X 16 71 P 116 Waterfront Mugg's Island X X 10 53 P 117 Waterfront Wildlife Sanctuary X X 21. 00 P 118 Waterfront Snake Island X 3.54 P 119 Waterfront East Ward's Island X X 6.97 P 120 Waterfront Aquatic Park X IX X X 56 89 P 121 Waterfront Glen Stewart Ravine , X X 9 93 P Tl - 4 ESA Criteria Fulf11led Area Municipality No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership Borough of York 7 Humber River Lambton Park X X 871 A, P City of 12 Humber River Bluehaven Area X o 94 A, P North York 14 Humber River Rowntree Mill Swamp X 3 88 A 63 Don Ri ver Wilket Creek Forest X X X X 35 04 A, P 64* Don River Burke Brook Forest X X 19 23 A, pr 65 Don River Glendon Forest X X 43.46 A, P, Pr 66 Don River Earl Bales Woods X 7 26 pr 67 Don Ri ver Bell's Woodlot X 3 74 P 68 Don Ri ver Black Grass Site X 1 70 Pr 69 Don Ri ver East Don Valley Swamp X X X X 57 71 A 70 Don River William's Area X 1. 21 A, P Borough of 61 Don Ri ver Don Valley Brickyard X 0.88 pr East York 62 Don River Taylor Creek Site X 44.68 A, P, pr 64* Don River Burke Brook Forest X X 19.23 A, Pr Borough of 74 Highland Cr Stephenson's Swamp X X 44 25 A, P, pr Scarborough 75 Highland Cr Highland Forest X X 82 41 A, P 76 Highland Cr Hague Park X X 4 49 P, pr 77 Highland Cr Morningside Park Forest X 82.48 A, P 79* Rouge River Rouge Marsh Area X X X X X 84.54 A. P, Pr 80 Rouge River Rouge-River Whitby Formation Section X o 07 A 81* Rouge River Little Rouge Forest X X X X X 119 55 A 82 Rouge River Morningside Creek Forest X X X X X X 60 85 A, P, pr 83 Rouge River Tabor's Horsetail Meadow X X 371 A 84 Rouge River Core Woods X 7 03 A 85 Rouge River Pearce Woods X X 5 80 A 86 Rouge River Diller Woods X o 88 A, P 87 Rouge River Milne's Forest X X X 55 47 A, Pr 88 Rouge River Woodlands X X X 14 28 P 122 Waterfront Fallingbrook Woods X 077 Pr 123 Waterfront Scarborough Bluffs Sequence X 72 94 A, P, Pr 124 Waterfront Guild Woods X X 10 27 A 1125 Waterfront I East Point 1 X I X X X X 12 20 A, P CD I w CXI 0 -. \~ Tl - 5 CD I w CD Criteria Fulfilled I-' ESA Area Municipalitv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership REGION OF DURHAM Town of 108 Duffin Creek Uxbridge Forest X X X X X 105.82 pr Uxbridge 109 Duffin Creek Bro.m-Shaw Area X X 25 92 Pr 110 Duffin Creek North Glasgow Area X X X X X 247 42 Pr,A 111* Duffin Creek Uxbridge Forest Kames X X X X X X X X 301. 60 A. Pr Town of 78 Rouge River Rouge Lakeshore Swale X X X 1.47 A, pr Pickering 79* Rouge River Rouge Marsh Area X X X X X 84 54 A, P, Pr 81 Rouge River Little Rouge Forest I X X X X X 119.55 A 94 Rouge River Petticoat Creek Forest X X X X 44 44 A, P 95 Duffin Creek Altona Forest X X X X 48.40 Pr 103 Duffin Creek Byer-Saddler Area X X X X 16 20 pr 104 Duffin Creek Birrell-Boyer Area X X X 44 97 A 105 Duffin Creek Pugh-Holdon Area X X X X 34 38 pr 106 Duffin Creek Pugh Forest X X 2 50 Pr 111* Duffin Creek Uxbridge Forest Kames X X X X X X X X 301. 60 A. Pr 126 Waterfront Frenchman's Bay Marsh X X 14.9 A, P, Pr Town of Ajax 96 Duffin Creek Duffin Marsh X X X X X 133.82 A, P 97 Duffin Creek Major-spink Area X 31 II A, pr 98 Duffin Creek Whitevale Corridor X X X X X 387.38 A, P, Pr 99 Duffin Creek Haight Area X X 9.78 pr 100 Duffin Creek Boone Woods X X 14 48 A, pr 101 Duffin Creek Hartrick Area X 11 05 A 102 Duffin Creek Greenwood Richweed Site X 1 13 A, pr 112 Carruther's Carruther's Creek Marsh X X X X 41 63 pr Creek 113 Carruther's Carruther's Creek Forest X X X 52.32 pr Creek OWnership: A - Authority P - Public Pr - Private *Site overlaps municipal boundarie , B-382 - 3 - Management The type and degree of management to be applied to an ESA can only be determined after the fundamental issue of preservation vs protection has been addressed. Preservation involves the artificial maintenance of an ESA at a specific point in its successional history The natural processes are interfered with to retain a desired state. For example, it may be desirable to ensure the retention of a provincially or nationally rare species through active preservation practices, or to retain a particular state on the basis of educational or scientific significance. Protection, on the other hand. concentrates on safeguarding the natural features, functions and processes of an ESA from external, artificial disturbances Such disturbances mLght include the physical loss of an ESA due to a land use change or the physical modification of an ESA by activities such as tree cutting, indiscriminate dumping or incompatible open space/park uses Since the protection of an ESA does not interfere with the internal natural processes of succession, it is conceivable that an ESA designation may be removed from a site when the selection criteria are no longer satisfied. The issue of preservation versus protection is complex, making the preference of one management philosophy over the other difficult, unless examined on a site by site basis - However, as a management strategy guide, it is proposed that all ESAs be protected to the extent possible, while those ESAs be preserved where site specific conditions and potential uses warrant MTRCA Involvement The MTRCA has been involved in resource management since its inception in 1957 Its most recent planning effort, the Watershed Plan (1980 ) identifies a number of overall strategies for the management of the river valleys, the Oak Ridges Morraine and the Lake Ontario Waterfront Three component programs directly apply to ESAs - the Land Acquisition Program, the Stormwater Management Program and the Conservation Land Management Program. The Land Acquisition Program provides the MTRCA with the direction to acquire lands in and adjacent to the major river valleys, along the waterfront and in the headwaters zone for general conservation or hazard land protection Wi th the completion of this ESA study, the implementation of the Land Acquisition Program can be more finely tuned to include specific boundaries for ESAs. One of the major principles of the Storm Water Management Program is to minimize impacts on the watershed system as a result of new development In this regard, the Program calls for the preparation of master drainage plans, which would include the establishment of a resource data base and the identification of development B-383 - 4 - constraints The five major concerns to be addressed in a master drainage plan are flood control, erosion control, water quality, base flow and the environment With the completion of the ESA study, the environmental component of master drainage planning will include information on ESAs The goal of the Conservation Land Management Program is to "contribute to the quality of land and water resources through a comprehensive program of conservation land management, including forest management, wildlife habitat improvement, stream improvement, source area protection, and conservation land planning." To implement this program, the MTRCA provides technical assistance and advice to private landowners and public agencies in an effort to maintain sound conservation management practices The MTRCA also cooperates with others in identifying and protecting areas of biological and hydrologic significance and sensitivity as well as in the management of such areas on an individual basis The orientation of the Conservation Land Management Program is such that the preparation of management guidelines and the actual management of ESAs can readily be incorporated In addition the Fill, Construction and Alterations to Waterways Regulations under Section 28 of The Conservation Authorities Act, can be applied, in part, to the ESAs The MTRCA currently has mapped major portions of the valley lands and the Lake Ontario waterfront within its jurisdiction, in order to administer its Regulations These regulated areas contain ESAs: however not all ESAs are contained within these limits The Regulations are permissive in nature and require the merits of each proposal to be judged on a site specific basis The MTRCA's Watershed Plan and Regulations do therefore have the potential to address ESAs, however their current application is limited The following are suggested for future direction 1 that the concept of ESAs be recognized as a component of the MTRCA's implementation of its mandate: 2 that the Watershed Plan, in particular the Land Acquisition Program and the Conservation Land Management Program, be amended to incorporate the ESAs currently identified and the concepts of ESA management: 3 that environmental reviews be undertaken for all proposed MTRCA works which may impact ESAs and where potential impacts are identified, the means of mitigating these potential impacts be addressed: 4 that individual management plans be prepared for ESAs on land owned and managed by the MTRCA other public agencies who manage MTRCA land or own and manage their own land also be requested to prepare individual ESA management plans, with the assistance of the MTRCA or other appropriate agencies: B-384 - 5 - 5. that management guidelines be prepared by the MTRCA explaining the significance of ecological systems (i e marsh. forests, etc ) and identifying the benefits/disbenefits of various actions: 6 that a strategy be prepared within the community Relations Program to inform and/or educate the general public and private landowners concerning ESAs: 7. that all master drainage planning undertaken by the MTRCA, or in conjunction with the municipalities, other agencies or developers, recognize and incorporate ESAs: 8 that the MTRCA utilize ESA information as part of the data base for the municipal plan review process: 9 that the regulatory powers of the MTRCA, under Section 28 of The Conservation Authorities Act, with respect to the placing or dumping of fill be investigated. as to their potential to include those ESAs not currently regulated: and 10 that the ESA data base be maintained and refined in conjunction with the MTRCA's member municipalities, the Province of Ontario, affected agencies, special interest groups and others It has been recognized that The Metropolitan Toronto and Region Conservation Foundation (MTRCF) will also assist in the protection of ESAs To date the financial support of the Foundation has contributed significantly to several of the MTRCA's major capital projects. With the completion of these projects, the Foundation's long-term objectives will include the establishment of a Conservation Land Acquisition Fund for the purpose of acquiring "environmentally sensitive lands when they come on the market" (MTRCF 1977) Municipal Involvement Incompatible land use is perhaps the most significant factor affecting ESAs Much of the power to control development and, therefore, protect ESAs lies with the municipalities, under the Planning Act. Municipalities have the ability, through the land use planning process, to guide and direct development based on the policies set forth in official plans, secondary plans (or their equivalent), restricted area (zoning) by-laws, site plan control by-laws and plan of subdivision controls. Further, where appropriate, innovative measures such as density transfers or bonus systems may be utilized. Most of the municipalities within MTRCA jurisdiction have Open Space or Environmental policy statements in their planning documents which recognize the significance of the major resource features - the river valleys, the Oak Ridges Moraine and the Lake Ontario waterfront Few, however, include reference or policies specific to ESAs This situation is understandable as the municipalities have been aware of the MTRCA ESA study and have been awaiting its completion - B-385 - 6 - Where new official plans have been developed since 1970, municipalities have incorporated Hazard Land policies Hazard Lands are areas subject to natural conditions or physical processes, such as flooding or instability, which pose a threat to life and property if developed ESAs on the other hand, are areas which possess unique or unusual natural features and/or are essential for the maintenance of specific natural processes. ESAs are susceptible to modification or destruction by human activity Often ESAs may be found on Hazard Lands, such as a marsh community within the flood plain, however, not all Hazard Lands are ESAs Since ESAs may occur within Hazard Lands, it is important to distinguish between the two in planning policies, in order to ensure that ESAs are adequately addressed It may be possible to overcome the physical limitations of Hazard Lands through te9hnical modification, however, this same modification could have the potential for substantially altering or eliminating the ESA Similarly, where an ESA is located within lands designated for Open Space, separate policies specific to ESAs are preferrable as many uses permitted in Open Space designations may not be desirable for ESAs. Consideration should be given, therefore, to having ESAs recognized separately or as an additional level of concern in planning documents distinct from Open Space or Hazard Lands ~ Central to the protection of ESAs, and probably the most controversial issue, is the degree of development or land use alteration that may be permitted to occur Certain Ontario municipalities have established ESAs as "no development" areas, while others have been prepared to consider low impact development compatible with the specific characteristics of the individual ESA This principle of "no development" versus "low impact development" is established in policies at the Official Plan level Decisions on detailed land use and density, where permitted, and the delineation of boundaries are left to subsequent stages of the planning process While each municipality within the MTRCA's jurisdiction must develop its own philosophy and approach to ESAs, the following are offered for consideration 1 ESAs, as determined by the MTRCA study or other appropriate studies, be recognized in the Official Plan It should be noted that additional ESAs or deletion of areas, if they no longer fulfill the criteria, may be made from time to time through amendment to the Official Plan 2 The Official Plan should provide policies to define the intent of the municipality with respect to ESAs Subsequent levels in the planning process should determine specific policies, details of permitted uses and management guidelines based on the individual characteristics of any ESA - 7 - B-386 3 The identification of ESAs in Official Plans and the policy statements specific to them should be distinct from those for Open Space or Hazard Lands or their equivalents 4. Proposals for development within or adjacent to an ESA, or having the potential to affect an ESA, should be accompanied by an environmental impact study The purpose of the study would be to demonstrate if any adverse impacts existed and if so the measures which would be taken to minimize the impacts on the ESA The possible requirement for an environmental impact study should apply to both public and private proposals 5 Where appropriate, municipalities should consider the use of such techniques as density t~ansfer or bonus systems, utilization for calculation of permissible density or other innovative mechanisms to maintain ESAs and/or bring them into public ownership. 6 Where ESAs occur within the public open space system, the planning and management of municipal parklands should recognize and provide for the protection of ESAs The MTRCA is prepared to cooperate with other public agencies in this regard 7 The municipalities cooperate with the MTRCA to ensure the integrity of privately-owned ESAs by forwarding private development or redevelopment proposals involving ESAs to the MTRCA for review 8 Municipalities seek the cooperation of adjacent municipalities and/or conservation authorities in addressing ESAs which overlap boundaries 9 The identification of ESAs does not imply that these lands will be purchased by a public agency not that ESAs on private lands are open for public use Provincial Involvement At the Provincial level, the Ministry of Natural Resources and the Ministry of the Environment are the agencies most involved with the conservation and protection of the natural environment The Ministry of Natural Resources has responsibility for conservation of the natural environment and regulation of commercial and recreational use of natural resources The following legislation is of direct application to ESAs - the Lakes and Rivers Improvement Act which regulates the location and nature of improvement in a water course so as to ensure the perpetuation of the fish, wildlife and other natural resources dependent on such watersr B-387 - 8 - - the Woodlands Improvement Act which enables the MNR to enter into agreements with private landowners for the planting of nursery stock and improvement of woodlands Under this Act, Cabinet can also make regulations to designate parts of Ontario as private forest management areas: - the Endangered Species Act which preserves areas of natural habitat for designated endangered species in the Province - the Fisheries Act which is federal legislation administered in Ontario by the Ministry of Natural Resources The purpose of this Act is to control activities that are environmentally detrimental to fish (i e water quality impairment, habitat destruction, etc ) The Ministry of the Environment, through the Environmental Assessment Act, the Environmental Protection Act and the Ontario Water Resources Act, also has the legislative mandate to control any type of pollution which may impair the quality of the natural environment and to require environmental assessments for various types of projects In addition to these legislative powers, the Province is continuing to develop policies for the management of natural resources An example, which is 0 f interest to the ESA study, is the Province's Discussion Paper "Towards a Wetland Policy for Ontario" In this report the Province identifies the rationale for a strategy to retain wetlands The MTRCA supports this aim as parallel with its own program objectives The protection of ESAs is also possible through the new Planning Act This proposed Act gives the Minister of Municipal Affairs and Housing (jointly with any other Minister, if a mutual interest exists) the power to issue statements of policy on matters relating to municipal planning, that in the opinion of the Minister are of Provincial interest Once issued, municipalities, boards, ministries, commissions and agencies of the government must have regard to provincial policy statements in planning matters Also, under Section 2 of the proposed Act, matters of provincial interest include - the protection of the natural environment, and the management of natural resources: - the protection of features of significant natural, architectural, historical or archaeological interest B-388 - 9 - Public Irivolvement Special interest groups will also be encouraged to support the MTRCA and local municipalities in their endeavours to update ESA data bases and to assist in management programs, where appropriate Private landowners of ESAs will be encouraged to retain the natural integrity of these lands. When land use changes are proposed, landowners will be encouraged to limit uses to those compatible with the biological and physical functions of the area To assist landowners, private lands assistance programs are available through the MTRCA's Conservation Land Management Program. Management Practices The management of an ESA will be dependent upon the type of management desired (protection versus preservation), individual site conditions, and to varying degrees on the ownership of the ESA itself The MTRCA is of the opinion that management plans should ultimately be prepared for all ESAs Such plans need not be independent, but rather could form a component of an operations or maintenance plan, an overall resource management plan for a larger area of a component or a master planning or similar planning exercise Although the MTRCA is prepared to cooperate with other agencies and groups in the preparation of management plans, their preparation is not envisioned as being a major undertaking The overall thrust in preparing a management plan is to recognize that the ESA exists and that the significant features of the ESA be considered in the maintenance or use of the area. A number of management techniques readily exist to assist the various agencies and individuals responsible for the management of lands that contain ESAs. Protection techniques can be arranged into two types - vegetation and access management Vegetation techniques would include. buffer plantings, woodlot management, tree and shrub plantings, and controlled grass cuttings For ESAs suffering from disturbance, access restrictions and/or controls can be employed Fence construction, signage and posting. trail development and patrolling are all means whereby this can be accomplished Management techniques for the preservation of ESAs include. woodlot management, tree and shrub plantings, selective cuttings and pruning, and controlled burns In addition, techniques such as nest box and island construction, brush pile creation and planting of food plots involve wildlife management so that habitats can be maintained at specific points B-389 - 10 - For ESAs currently managed for some purpose, the managers would be in the best position to prepare management plans or incorporate ESA management techniques in existing operations or maintenance plans. They are the individuals who have first hand knowledge of the areas on a day by day basis, including any problems that may exist To help establish a coordinated approach to the preparation of management plans, the MTRCA will prepare an overall priority rating. Priorization will be based on the need for management due to existing and/or potential impacts. As well, the MTRCA is prepared to offer assistance to other agencies through technical advice It is, therefore, the proposal of the MTRCA that the MTRCA prepare management plans, on a priority basis, for ESAs on MTRCA lands managed by its own forces For ESAs on MTRCA lands managed, through agreement, with other public agencies or other publicly owned lands, the preparation of management plans would be the responsibility of the managing agencies For ESAs on private lands, the MTRCA will explain to the owners the details of the ESAs and will discuss any existing and potential impacts. The MTRCA will encourage landowners to manage the lands in a fashion suitable to the ESAs and will inform them of the MTRCA's resource assistance programs These programs include technical advice through the preparation of conservation plans and technical assistance through reforestation, tree and shrub plantings and stream improvements To assist in the preparation of management plans, the following process is suggested Step 1 The review of the ESA criteria is essential in formulating any management plan Site visits must be conducted by qualified resource person(s) who would be able to interpret the criteria and information accurately Step 2 The review of the present impacts is accomplished at the same site visit in Step 1 An impact would be considered as any activities, operations or developments that are occurring, and are or will disturb, destroy or impede the natural functions or processes that initially qualified the area as an ESA Step 3 The review of future, potential impacts is just as important as Step 2 The intent here would be to prevent or minimize the effects of future activities or development that could impact the ESA - 11 - B-390 Step 4 Before a management plan is formulated the degree of management and site protection or preservation must be determined Consideration of educational or scientific uses of the ESA will assist in this determination. Step 5 The final stage in the management plan is to document the procedures to be employed to ensure that the plan is initiated and monitored The following is a sample ESA site report and a sample management Plan / B-39l - 12 - Sample Management Plan The following is presented as an example management plan This particular area is owned and managed by the MTRCA Impacts currently exist and techniques are proposed to minimize them. A portion of the area is proposed for preservation due to its educational potential. General Description The Pine Valley Forest is located on the east side of the Humber River, south of Rutherford Road on both sides of Pine Valley Drive in the Town of Vaughan (Figure 3) The total area (38 hectares) incorporates a number of mature and mature-mixed forests on the steep west-facing valley walls and on the wide flood plain. Dominant overstorey species are Eastern Hemlock, Sugar Maple, and American Beech A swamp cornrnuni~y is interspersed along the wide flood plain in open areas within the mature-mixed forest The majority of the Pine Valley Forest is located within the Boyd Conservation Area or other MTRCA lands with approximately 5 1/2 hectares on private lands ESA Criteria Fulfilled ~ The Pine Valley Forest satisfies Criterion 3 of the Environmentally Significant Areas Study The area is considered high quality for the following reasons: a significant number of seedlings and saplings of Eastern Hemlock are present in the understorey and ground cover of the forests: extensive forests of regenerating Eastern Hemlock are unusual in the MTRCA region: Sugar Maple and American Beech exhibit good regeneration: superior specimens of both Eastern Hemlock and Black Cherry occur throughout the area: and the forests are extensive and relatively undisturbed Current Impacts The majority of the Pine Valley Forest located in the Boyd Conservation Area is experiencing some disturbance due to visitors of the area These visitors can be categorized in the following manner daily visitors of Boyd Conservation Area: summer day camp visitors: group camp visitors: nature trail visitors PINE VALLEY FOREST NO. 21 B-392 ~a ~ l )iJ L~ THE NATIONAL GOLF CLUB N f BOYD CONSERVATION ESA NO. 21 IZ2d AREA ----- FIGURE 3 NOT TO SCALE B-393 - 13 - These impacts can be summarized as overuse of the present system of trails ( formal and informal) that are located within the forest plus indiscriminate use of the forest as a "play area" in sections that are sensitive, such as wet areas and slopes This problem is not overly critical but does require management so as to alleviate the more serious impacts and ensure the problem does not expand Within the Pine Valley Forest are three residential dwellings Trees felled for firewood is the major impact from this source, but there was also evidence of dumping of refuse that deteriorated the visual amenities of the forest Potential Impacts Currently, the Boyd Conservation Area and adjoining lands are undergoing a master plan review by the MTRCA All ESAs that could possibly be affected by this development have been identified and are being taken into consideration throughout the planning process Management Approach The Pine Valley Forest will be managed so as to: preserve the area dominated by Eastern Hemlock by encouraging this species to regenerate and maintaining suitable conditions for regeneration: protect the remaining areas of this forest stand The ESA report for the Pine Valley Forest identified significant regeneration of Eastern Hemlock However, where this is occurring, the density of over storey species and the maturity of dominant species effectively competes against and reduces the regenerating component of the woodlot To rectify this problem, a woodlot management program is required with the following objectives to promote the regeneration of Eastern Hemlock, through a program of selective cuttings of over-mature, dead, dying and diseased species This would effectively open up the dense canopy and reduce the competition for living space and available nutrients Such a forest management program will be cognizant of the role of the forest for habitat and will be reflected in the selective cuttings by leaving suitable numbers of den and food trees for the area: to improve the entire stand's vigour and health through a program of selective cuttings: to eliminate any safety hazard from dead or dying trees that infringe upon visitor use of the trail system: , B-394 - 14 - to promote the habitat for wildlife by creating brush piles from the slash obtained through the forest management program. As identified through field investigation and discussions with area staff, there occurs an overuse problem with respect to visitors To overcome this problem a number of management steps will be taken: . the existing trail system will be upgraded and better defined so as to encourage visitors to remain on the trails. The use of signs, self-guided viewing stations and brochures will help to alleviate the problem: the extension of the total trail system north to the Kortright Centre for Conservation is a good possibility that will encourage visitors to properly utilize the trails: discussions will occur between MTRCA staff and the summer day camp administrator and group leaders for the group camp area to inform and educate them concerning the ESA Sensitive areas within the forest will be marked and identified to these individuals so that further use of the forest will not affect these areas To discourage unauthorized activities (Le. firewood cutting) from occurring, the north and west boundaries will be fenced with a 9-strand farm fence and signs will be erected identifying the area as an ESA The Trespass to Property Act wil be utilized with permitted uses signs posted Approximately 600m of fence will be required. Discussion will occur between the MTRCA and the local residents (3) to inform and educate them concerning the ESA These individuals will also be informed of the permitted activities that may occur in the area If necessary, the rental agreements that the MTRCA has with these individuals could be modified to reflect the concerns Plan Implementation The Pine Valley Forest management plan has been prepared in conjunction with the Boyd Conservation Area staff The Area Superintendent is fully appraised of the plan and is cognizant of his responsibility in its implementation It is understood that any selective cutting will only be carried out under the direction and supervision of the Conservation Services Section of the MTRCA Any modifications to the trail system in the area will be examined as part of the current Boyd Conservation Area master plan update study, including examination of impacts ~ B-395 , the metropolitan toronto and region conservation authority minutes REPORT #18/83 EXECUTIVE COMMITTEE 2-NOVEMBER-1983 #18/83 The Executive Committee met at the Authority Office, 5 Shore ham Drive, Downsview, on Wednesday, 2 November, 1983, commencing at 1 00 P m PRESENT Chairman Mr s. F E 0611 Vice-Chairman E.V Kolb Members W.G. Barber M W H Biggar E. Fulton Mrs. t. Hancey H.C. t.awrie S.A. Macpherson Ms S. Nimmo J S. Scott Authority Member MM. Smi th, Q C ABSENT Member Mrs. N. Stoner . MINUTES Res #290 Moved by W G Barber Seconded by: M.W.H. Biggar THAT the Minutes of Meeting #17/83 be approved. CARRIED SECTION I NO ITEMS . SECTION II FOR INFORMATION 1 CORRESPONDENCE Mr. W.A. McLean, Acting Gener.al Manager,. reported receipt of tha following correspondence: (a) t.atter from The Association of Conservation Authorities of Ontario attachinq copy of letter, dated October 3, 1983, from the Executive Director of the Association to the Deputy Minister of Natural Resources concerning Preliminary Provincial Policies for Conservation Authorities: forwarding the following resolution adopted by the ACAO Executive Committe~ on September 20, H84-: "Resolution #54/83 THAT the four ACAO regional chapters be requested to prepare their collective responses to the MNR Preliminary Provincial Policies for Conser.vation Authori ties and that these- respon'ses form the ba'sis for a draft ACAO response to be considered' at the' Board of Directors' meet- ing in December, 1983 and that the Ministry of Natural Resources be " advised that the ACAO response will be. submitted by December 31, 1983 B-396 -2- (b) Letter addressed to Mr Biggar by the Honourable Susan Fish, Minister of Citizenship & Culture, advising that the application for a 1983 operating grant has recently been approved and a grant of $191,099 00 issued " It is very encouraging that, in this time of financial constraint, the Black Creek Pioneer Village was able to expand its activities and public programming over the past year and to qualify for this increased grant from my Ministry In making this payment, I ask that our support be acknowledged in all promotional or educational material produced by the museum We suggest that you use the phrase 'the assistance of the Ontario Government through the Ministry of Citizenship and Culture is gratefully acknowledged' " Res #291 Moved by M W H Biggar Seconded by H C Lawrie THAT the letter from the Honourable Susan Fish, under date of October 14, be received, AND FURTHER THAT the staff be directed to prepare a report for the consideration of this Committee concerning the proposed method for acknowledgment of the assistance of the Ontario Government CARRIED (c) Letter dated October 25th, 1983, received from the Chief Administrative Officer of The Regional Municipality of Peel, requesting that the Authority enter into negotiations for the use of a piece of property in connection with their Employment Strategies Team Res #292 Moved by E V Kolb Seconded by Mrs L Hancey THAT the letter dated October 25, 1983, from The Regional Municipality of Peel be received, AND FURTHER THAT Mr Richard L Frost, Chief Administrative Officer, be informed that the Author~ty is prepared to enter into discussions concerning use of a suitable piece of Authority-owned property, in the vicinity of the Snelgrove Reservoir s~te, ~n connection with development of a youth employment training program by the Region's Employment Strategies Team CARRIED 2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #293 Moved by E V Kolb Seconded by M W H Biggar THAT the applications listed herein as A(l) to A(7) inclusive, be approved, subject to the conditions contained in the reports CARRIED A(l) Scarborough Centenary Hospital To place fill at rear of hospital at #2867 Ellesmere Road City of Scarborough (Highland Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) Drawing #P-3, Grading Information, prepared by Paving Consultant Services and dated July II, 1983, (b) Details of Proposed Gabion Walls, prepared by Paving Consultant Services, (c) Drawing #P-2, Site Plan, prepared by Paving Consultant Services, and dated June 27, 1983, (d) Landscaping Plans prepared by Baker, Salmona, Hess Limited -3- B-397 A(2) Uniwood Homes To construct two single-family dwellings at #27 Knigh tswood Dr , Citv of North York (Don River Watershed) . In accordance with the following documents and plans, which shall form part of the permit .Drawing #Al to AlO, prepared by Morton Katz, Architect, and dated September 25, 1983. A(3) Mr Claude Abrams To alter watercourse, #7195 Bayview Avenue, Town of Markham, (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Plan #1 and #2, dated October 25, 1983 A(4) George & Elizabeth Traynor To construct two additions to residence, north of Albert Street, west of Union Street, Village of Bolton (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit The drawings prepared by Albert Settino and forming part of the permit. A(5) Castcar Investments Ltd To build structure within Regional Flood plain, #1864 Kingston Road, Town of Pickering (Duffin Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan showing the location of the dwelling, Typical sections of the new basement walls A(6) The Municipality of Metropolitan Toronto Parks & Property Department To undertake erosion control and bank stab1lization works, Glen Rouge Trailer Park, north of Highway #2, east; of Sheppard Avenue East, City of Scarborough (Rouge River Watershed) In accordance with the following documents and plans, which shall form part of the permit A location map and typical channel section prepared by the applicant A (7) The Pierson Group Limited To place fill and stab11ize eroded valley wall, #2360 Weston Road at St. Phillips Road , City of York (Humber River Watershed) In accordance with the following plans and documents, which shall form part of the permit Slope Protection & Drainage Plan, Sheet #:L-2, prepared by The Pierson Group Limited, and dated October, 1983 B-398 -4- 3 CORPORATION OF THE TOWN OF VAUGHAN -Request for Permanent Easement north of Steeles Avenue, west of Jane Street Res. #294 Moved by E V Kolb Seconded by M.W H Biggar WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of a request from the Corporation of the Town of Vaughan to grant a permanent easement across Authority-owned lands to facilitate new industrial development, located north of Steeles Avenue, west of Jane Street, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with the Town of Vaughan in this instance, THAT a permanent easement, containing 0 485 acres, more or less, be granted to the Town of Vaughan to facilitate new industrial development located north of Steeles Avenue, west of Jane Street, said land being Part ot Lot I, Concession V, Town of Vaughan (The Regional Municipality of York), designated as Part 1 on Plan 65R-6354, consideration to be the nominal sum of $2 00, plus all legal, survey, and other costs, THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 2l(c) of The Conservation Authorities Act, R S 0 1980, Chapter 85, as amended, AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED 4 THE MUNICIPALITY OF METROPOLITAN TORONTO -Request for Conveyance of Land east side Scarlett Road, north of Eglinton Avenue Res #295 Moved by E V. Kolb Seconded by M W H. Biggar WHEREAS The Metropolitan Toronto and Region conservation Authority is in receipt of a request from The Municipality of Metropolitan Toronto to grant conveyance of Authority-owned lands to facilitate the construction of a side- walk on the east side of Scarlett Road, north of Eglinton Avenue, in the City of Etobicoke, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its objectives as set out in Section 20 of the Conservation Authorities Act, to co-operate with The Municipality of Metropolitan Toronto in this instance, THAT three small parcels, containing a total of 0 257 acres, more or less, be conveyed to The Municipality of Metropolitan Toronto for the construction of a sidewalk on the east side of Scarlett Road, north of Eglinton Avenue, in the City of Etobicoke, said land being Part of Lots 16, 17, and 18, Concession tn' , F T H , City of Etobicoke (The MuniCipality of Metropolitan Toronto), designated as Part 1 on Plan 64R-9252, and Parts 1 and 2 on Plan 64R-9253 Consideration to be the nominal sum of $2 00, plus all legal, survey. and other costs, THAT said conveyance be subject to an Order-in-COuncil being issued in accordance with Section 21(c) of The Conservation Authorities Act, R S 0 1980, Chapter 85, as amended, AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents CARRIED -5- B-399 5 LAND ACQUISITION PROJECT 1982-l984 DON RIVER WATERSHED -Property Von-Land Corporation Limited East of Keele Street, south of Langstaff Road, Town of Vaughan Res #296 Moved by E V Kolb Seconded by M W H Biggar THAT the report (October 26, 19831 set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED. Re Project Land Acquisition Project 1982-1984 - Flood Plain & Conservation Land Component Don River watershed Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property East of Keele Street, south of Langstaff Road Owner Von-Land Corporation Limited Area to be acquired: 32.920 acres, more or less Recommended purchase price $32,920 00 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lots 8 and 9, Concession III, Town of Vaughan (The Regional Mun~cipality of Yorkl, situate east of Keele Street, south of Langstaff Road "Negotiations have been conducted with the owner, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $32,920 00, with the dat~ of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid The Authority is to receive con- veyance of the land free from encumbrance, w~th the exception of an existing service easement "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "The proposed purchase has been arranged in such a manner as to be completed during 1983 or 1984, subject to availability of funding" 6 PROPOSED HYDRAULIC IMPROVEMENT MOUTH OF THE HUMBER RIVER Res. #297 Moved by Mrs L Hancey Seconded by J S Scott THAT the Engineering Department of the Toronto Harbour Commissioners be retained to complete design analysis, drawings, specifications, and cost estimates, as well as to ass~st in obtaining all necessary approvals for the proposed hydraulic improvement at the mouth of the Humber River, subject to the following (al The approval of Metropolitan Toronto being obtained for the use of existing unmatched Metropolitan Toronto levy funds associated with the Shoreline Management Programs, (bl Approval of the Province of Ontario be obtained for the project and for the matching funds, (cl The City of Toronto granting to The Metropolitan Toronto and Region Conservation Authority the necessary easements for construction and maintenance of the proposed structure, or transfer of title to the Authority of the lands required CARRIED - B-400 -6- 7 SHORELINE MANAGEMENT PROJECT 1982-1983 SCARBOROUGH SECTOR -Erosion Control Works Vicinity of Lakehurst Crescent Res #298 Moved by Mrs L Hancey Seconded by J S. Scott THAT the Authority serve as an agent for the City of Scarborough to implement erosion control works to protect an existing sanitary sewer in the vicinity of the west end of Lakehurst Crescent, subject to the following (a) The City of Scarborough enter into an appropriate agreement with the local property owners regarding access and control of liability, (b) The City of Scarborough agree to reimburse the Authority for all costs incurred in relation to this project, (c) The City of Scarborough and the Authority enter into a suitable agreement to define the scope of the work and limit the Authority's liability for the work CARRIED 8 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT -Property (a) Isabel Bayley, (b) Wells Renwick, (c) Giles W McKague, (d) Frank S Duckworth, (e) Mary L Morris Res #299 Moved by Mrs L Hancey Seconded by J S Scott THAT the Report (October 25, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED Re Project Land Acquisition Project 1982-1984 - Lake Ontario Waterfront Authority: Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property South side of Fallingbrook Drive OWners (a) Isabel Bayley (b) Wells Renwick (c) Giles Wallace McKague (d) Frank Samuel Duckworth (e) Mary Lavina Morris Area to be acquired (a) 0 446 acres, more or less (b) 0 648 acres, more or less (c) 1 132 acres, more or less (d) 3 114 acres, more or less (e) 2 636 acres, more or less Recommended purchase price Nominal consideration of $2.00 in each instance, plus vendors' legal costs "Included in the requirements for the above-noted project are five irregularly-shaped parcels of land, being Parts of Lots 36 and 37, Registered Plan 2836, Part of Lot 34, Concession VIII, and Part of Water Lot in Lake Ontario, City of Scarborough (The Municipality of Metropolitan Toronto), located south of Fallingbrook Drive, in the general vicinity of Victoria Park Avenue and Queen Street East "Negotiations have been conducted with the owners, and, subject to the approval of your Committee, agreement has been reached with respect to a price, as follows The purchase price, in each instance, is to be the nominal consideration of $2 00, with date of completing the trans- action to be as soon as possible -7- B-401 "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid The Authority is to receive con- veyance of the land free from encumbrance, with the exception of an existing service easement "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate "This property is being conveyed to the Authority in connection with certain erosion control works being carried out along the Scarborough Bluffs " 9. REPORT #2/83 - PERSONNEL SUB-COMMITTEE Res #300 Moved by Mrs L. Hancey Seconded by E.V. Kolb THAT Report #2/83 of the Personnel Sub-Committee, as appended as Schedule itA II of these Minutes, be received; AND FURTHER THAT the recommendations contained therein be approved CARRIED 10 REPORT #2/83 - FOOD SERVICES SUB-COMMITTEE Res #301 Moved by M.W H Biggar Seconded by: W G. Barber THAT the agreement dated January 12, 1983, between The Metropolitan Toronto and Region Conservation Authority and Dalmar Foods Limited, for the manage- ment of the Authority's food service facilities, be renewed for a one-year period, commencing March 1, 1984, and concluding February 28, 1985, THAT the management fee stipulated in the agreement be amended to 4 25% of net sales for the period of the renewal, AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action ~s required to give effect thereto, including the execution of any documents. CARRIED 11 APPOI~TMENT OF AUTHORITY MEMBER BY THE MUNICIPALITY OF METROPOLITAN TORONTO In accordance with the Conservation Authorities Act, R S 0 1980, Chapter 85, section 5-(5), " the number of members appo~nted to the Metropolitan Conservation Authority by The Municipality of Metropolitan Toronto shall, at all times, be equal to the total number of members appointed by the other partic~pat~ng municipalities (The Regional Municipality of Peel appointed Councillor R Skjarum to the Authority on March 10, 1983, as the result of a population increase entitling the Region to representation by one additional member) Res #302 Moved by, J S Scott Seconded by E.V Kolb THAT the staff report having regard to the appointment to the Authority by The Municipality of Metropol~tan Toronto, of Mr Brian G Harrison, for the balance of 1983 and unt~l the first meeting of the Authority after the term for which he was appointed has expired, be received CARRIED B-402 -8- 12 STAFF FINANCIAL PROGRESS REPORT -July l/September 30, 1983 In a~cordance with discussion at a previous meeting concerning the length of the above-noted report, the Acting General Manager informed the Committee that since the progress report is presented elsewhere, it was considered advisable to retain the present form Mr McLean presented a summary of each section Res. #303 Moved by S.A Macpherson Seconded by E. Fulton THAT the Staff Financial Progress Report for the period July 1 - September 30, 1983, as appended as Schedule "B" of these Minutes, be received CARRIED. 13 FINANCIAL REPORT AND ACCOUNTS FOR THE MONTH ENDING OCTOBER 2, 1983 Res #304 Moved by Mrs L. Hancey Seconded by S A Macpherson THAT the Divisional Expenditure Summary for the period September 5, 1983, to October 2, 1983, as appended as Schedule "CD of these Minutes, be received, AND FURTHER THAT payment of the Authority accounts, in the amount of $1,687,324 00, be approved CARRIED I The Chairman reminded the members that the Ceremonial Sod-Turning for the Black Creek Pioneer Village Visitor Centre would take- place a~ 3 30 p m , with the Honourable Susan Fish, Minister of Citizenship and Culture, officiating 15 TERMINATION On motion, the meeting was terminated at 2 10 P m , November 2, 1983 Florence E Gell W.E Jones Chairman Secretary-Treasurer KC B-403 SCHEDULE flAil TO: The Chairman and Members, Executive Committee, M T R C.A , #18/83 FROM Mrs Lois Hancey, Chairman, Personnel Sub-Committee RE REPORT #2/83 PERSONNEL SUB-COMMITTEE THE SUB-COMMITTEE RECOMMENDS: 1 THAT the position "Superintendent - Office Services" (SMl) be replaced by two positions "Administrative Assistant - Print and Mail Room" (G04) , and "Property Assistant" (G03), THAT the position "Print Room Assistant" (G01) be eliminated, THAT the Head Office lunch room facilities be under the direction of the Manager, Food Services, AND FURTHER THAT the Head Office reception/switchboard be supervised by the Administrative Assistant - Senior Management 2 THAT Personnel Policy A-6 - Classification System - as amended to (a) reflect the Personnel Officer's involvement in the classification system, (b) clarify. in item 2, existing practice for new .. , positions, (c) establish, in item 3, a new procedure for review of positions that become vacant, and appended as Appendix 'A' hereto, be approved 3 THAT Personnel Policy A-3 - Appeal Procedure - be amended to include the involvement of the Personnel Sub-Committee, as Item (c) (Appendix 'B' hereto) 24-0ctober-1983 KC , B-404 APPENDIX ' A' DRAFT AMENDMENT THE METROPOLITAN TORONTO AND REGION CONSERVATION ACTHORITY PERSONNEL MANUAL SECTION A - WORKING CONDITIONS Executive Mtg. PERSONNEL POLICY A-6 Resolution No. CLASSIFICATION SYSTEM Date (l) The classification system shall be as described and set forth in Schedules A and B appended. (2) Position descriptions for new positions will be submitted to the Classification Committee, through the Personnel Officer, for classification. (3) The job description and classification of existing positions that become vacant will be reviewed automatically by the Personnel Officer prior to posting or advertising. , (4) Employees who consider that their position is improperly classified shall discuss the claim with their immediate supervisor, who, together with the Personnel Officer, will review the request. If further review is required, ~e Division Administrator and/or the Personnel Officer may request the Classification Committee to examine the claim and make recommendations to the General Manager who will make a final decision. APPENDIX 'B' B-40S THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SECTION A - WORKING CONDITIONS Executive Mtg. PERSONNEL POLICY A-3 Resolution No. APPEAL PROCEDURE Date: (l) Employees who have a complaint, concern or difference shall first discuss the matter with their immediate supervisor. (2) If the matter is not resolved, the employee may proceed as follows in order to reach a final decision: (a) Division Administrator; (b) General Manager or, in his absence, a designate; (c) Personnel Sub-Committee; (d) Executive Committee; ~ (e) Full Authori ty. - 5 - B-406 - 1 - SCHEDULE ltB" STAFF PROGRESS REPORT Property Section During the period July l, 1983 to September 30, 1983, the Property Section of the Finance and Administration Division completed the acquisition of l4 new properties containing 12.180 acres. The total acreage of lands owned by the Authority, as of September 30, 1983 is 27,858.583 acres. During the period the Property Section spent a considerable amount of time in the preparation, negotiation, and processing of shoreline management and erosion control agreements. The Property Section also carried out all of the administration management requirements in connection with Authority- owned lands; i.e. agreements, easements, assessments, taxes, leases, rentals, insurance, etc. With assistance from the C.O E.D. program, we have undertaken to prepare a complete set of deed plot maps of all Authority-owned properties in all the watersheds in the Authority's jurisdiction, using the new metric floodline maps. To date, mapping for the Etobicoke Creek, Mimico Creek, Highland Creek, Duffin's Creek, Rouge River and three-quarters of the mapping of the Don River has been completed. A breakdown of the properties and acreages acquired by the Authority to date is as follows ETOBICOKE CREEK WATERSHED Flood Control and Water Conservation: Tota~ to date-- 67 properties acquired containing 451.734 acres; Conservation Area - 1 property sale during period comprising 0.696 acres; - Heart Lake Conservation Area - sale to the City of Brampton for road widening purposes (0.696 acres) Total to date--10 properties acquired containing 418 l70 acres; Total of Watershed 77 properties acquired containing 869.904 acres MIMICO CREEK WATERSHED Flood Control and Water Conservation - 2 properties settled during period containing 0 590 acres; - 1 purchase - 1 permanent easement - Mimico Creek Flood Plain Lands - C.A. Davis Property, located on the east side of Royal York Road, south of G1enroy Avenue, City of Etobicoke. (1 purchase; 1 permanent easement) Total to date--49 properties acquired containing 9l.956 acres; - 2 expropriations outstanding (permanent easements) Total Watershed: 49 properties acquired containing 9l.956 acres. B-407 - 2 - HUMBER RIVER WATERSHED Flood C~ntrol and Water Conservation - 9 properties settled during period containing 1.670 acres; - 4 purchases - 5 permanent easements - Humber River Flood Plain Lands - G. and B. Goodfellow Property, located on the north side of Mill Street, Bolton, Town of Caledon. (l purchase; 1 permanent easement) - Regional Municipality of Peel Property, located on the east side of Highway i50, Town of Caledon (permanent easement) - A.D. McFall Property, located on King Street East, Bolton, Town of Ca1edon (permanent easement) - M E. Nicholson Property, located at the rear of 5670 Kirby Sideroad, Town of Vaughan (permanent easement) - E. Goodfellow Property, located on the north side of King Street, Bolton, Town of Caledon (1 purchase; 1 permanent easement) - Corporation of the Town of Caledon Property, located on the west side of Humber Lea Road, Bolton, Town of Caledon - L. and J. Schlechter Property, located at 268 King Street East, Bolton, Town of Caledon. - 1 property sale during period comprising 0.049 acres - Sale to A.D. McFall in a land exchange. (0.049 acres) Total to date--80l properties acquired containing 8,583.301 acres; Conservation Areas Total to date--79 properties acquired containing 4,305.773 acres; Forest and Wildlife Areas Total to date--lO properties acquired containing 786 486 acres; Agreement Forest Lands Total to date--23 properties acquired containing l,865.745 acres; Niagara Escarpment Lands: Total to date--4 properties acquired containing 25l.926 acres; Total of Watershed 917 properties acquired containing 15,793.231 acres. DON RIVER WATERSHED Flood Control and Water Conservation - 1 property settled during period containing 0.l03 acres; - 1 purchase B-408 - 3 - DON RIVER WATERSHED contd. - Don River Flood Plain Lands - Greenway Homes Limited Property, located on the west side of Leslie Street, south of Steeles Avenue, City of North York Total to date--l9l properties acquired containing l,955.l37 acres. - 4 expropriations outstanding (1 permanent easement) Conservation Area Total to date--l property acquired containing 9.350 acres; Total of Watershed: 192 properties acquired containing 1,964.487 acres. HIGHLAND CREEK WATERSHED Flood Control and Water Conservation: Total to date--143 properties acquired containing 823 911 acres; Conservation Area: Total to date--2 properties acquired containing 118.626 acres; Total of Watershed 145 properties acquired containing 942.537 acres. . I ROUGE RIVER WATERSHED Flood Control and Water Conservation - Rouge River Flood Plain Lands - 1 correction. On September 16, 1981 the Authority acquired a Flooding Easement only from Allstate Insurance Company of Canada over 20 000 acres of land in the Town of Markham. This correction removes the 20.000 acres from our land acquisition total, as we are not including Flooding Easements in our ownership figures. Total to date--l21 properties acquired containing 2,089.339 acres; Conservation Area Total to date--2 properties acquired containing 267 038 acres; Total of Watershed: 123 properties acquired containing 2,356.377 acres. - B-409 - 4 - DUFFIN'S CREEK WATERSHED Flood Control and Water Conservation - 1 property sale during period containing 0.244 acres; - Duffin's Creek Flood Plain Lands - sale to the Regional Municipality of Durham for road widening purposes. (0.244 acres) Total to date--90 properties acquired containing 905.423 acres; Conservation Area: Total to date--19 properties acquired containing 1,076 568 acres; Forest and Wildlife Area Total to date--16 properties acquired containing 1,749 696 acres; Agreement Forest Lands Total to date--l property acquired containing 93.000 acres; Total of Watershed 126 properties acquired containing 3,824.687 acres PETTICOAT CREEK WATERSHED Flood Control and Water Conservation: Total to date--l property acquired containing 22.139 acres; Conservation Area Total to date--l property acquired containing 177.918 acres; Total of Watershed: 2 properties acquired containing 200.057 acres LAKE ONTARIO WATERFRONT Waterfront Plan - 2 properties settled during period containing 9.817 acres; - 2 purchases; - Scarborough Sector - G. Schwarzkopf Property, located on the south side of Lakehurst Crescent, in the Birchmount Road area, City of Scarborough. - Municipality of Metropolitan Toronto Property, located on the south side of Copperfield Road, east of Manse Road, City of Scarborough. - 1 property sale during period comprising 0.340 acres; B-410 - 5 - LAKE ONTARIO WATERFRONT contd. - Scarborough Sector - sale to the Municipality of Metropolitan Toronto to facilitate access to the Easterly Filtration Plant, and as part of a land exchange. (0.340 acres) Total to date--28l properties acquired containing 1,765.917 acres. Conservation Area Total to date--9 properties acquired containing 49.430 acres; Total of Lake Ontario Waterfront: 290 properties acquired containing l,815.347 acres. SUMMARY FLOOD CONTROL AND WATER CONSERVATION July 1 - Sept. 30, 1983 - 12 properties settled containing 2.363 acres; (- 6 purchases; - 6 permanent easements - 3 property sales Total .to date--l,463 properties acquired containiing 14,922.940 acres; - 6 expropriations outstanding CONSERVATION AREAS July 1 - Sept. 30, 1983 - 1 property sale Total to date--123 properties acquired containing 6,422 873 acres. FOREST AND WILDLIFE AREAS July 1 to Sept.30, 1983 Total to date--26 properties acquired containing 2,536.182 acres. AGREEMENT FOREST LANDS July 1 - Sept. 30, 1983 Total to date--24 properties acquired containing 1,958.745 acres NIAGARA ESCARPMENT LANDS July 1 - Sept 30, 1983 Total to date--4 properties acquired containing 251.926 acres. B-411 - 6 - SUMMARY contd. WATERFRONT PLAN July 1 - Sept. 30, 1983 - 2 properties settled containing 9.817 acres; (- 2 purchases) - 1 property sale Total to date--281 properties acquired containing 1,765.917 acres. GRAND TOTAL OF ALL PROJECTS July 1 - Sept. 30, 1983 - 14 properties settled containing 12 180 acres; (- 8 purchases; - 6 permanent easements; - 5 property sales Total to date--1,921 properties acquired containing 27,858.583 acres; (11,274.369 hectares) - 6 expropriations outstanding < 1983 10.20 DO em B-4l2 To The Chairman and Members of the Executive Committee, M.T R.C A From: Mr R. K. Cooper, Administrator, Historical Sites Division Re Progress Report - July 1 to September 30, 1983 HISTORICAL SITES PROJECTS (Development) In late September Mitchell Construction began the excavation work for the Black Creek Visitors Centre. M.T R.C.A. staff removed all fenCing and trees in the construction area. A basement has been completed for the Tinsmith/Hardware Store and a framework for the building has been erected. The concrete lower floor of the Sawmill has been poured. HISTORICAL SITES PROJECTS (Operations & Maintenance) (a) Registration and Artifacts During the third quarter of 1983 Black Creek received forty-one items from nineteen donors. A notable donation was an early wooden pump and pipe manufactured in Claremont, Ontario. The Registrar's Department received instruction from the Conser- vation Co-ordinator of the Ministry of Citizenship and Culture on the treat- ment of iron artifacts The C.O E D worker assisting the Registrar has successfully treated a number of iron agricultural implements as a result of this training The stonepuller was repaired and painted. The forges in the Carriage Works were repaired and made operational The Registrar continues to have the capable assistance of a volunteer one dcty a week (b) Publicity and Promotion A Promotions Officer for the Village, Neil Beaudry, started working in the Historical Sites Division on July 4, under the direction of the Curator Already considerable attention has been given towards developing lists of target audiences, to whom appropriate information about Village special events can be directed. The identification of prospective clients for Black Creek is one of the most important marketing tasks at hand. This effort will continue over the next few months as we strive to discover groups of people with similar needs that we can satisfy To promote the special event "Family Fun" held on weekends during August, an ad was placed on the CITY KIDS poster which was widely displayed throughout subway stops, libraries and community centres Village staff participated in the first annual "Flax Festival", August 11 - 14, which was sponsored by the Red Cross and held at York University A demonstration of flax spinning was carried out and half-price admission coupons to the Village were distributed to visitors. On August 24 and 25 the Toronto-based theatre group "Meanfeat" performed in the Village. Their production of "The Good Woman of Setzuan" was enjoyed by visitors, confirming the need for more live theatrical and musical performances at the Village to increase visitation by families and senior citizens Historical Sites staff attended a meeting of Toronto museums at the office of the Metro Toronto Convention and Visitors Association, to explore the possibility of participating in a co-operative ad in MTCVA's consumer guide gook "Happening" (circulation 800,000) As a result, Black Creek will be featured in a full-colour, high-impact ad promoting several Metro museums This ad will be issued four times during 1984. ~ B-413 - 2 - Neil Beaudry visited the MTCVA offices again in early September to spend an afternoon with travel/trade planners, discussing the many opportunities available for Black Creek to attract additional visitation from motorcoach tour operators in 1984. Black Creek entered into agreements with Holiday Inn, Tourism Canada, Great Lakes Hostelling Association, Toronto Life Magazine, and the Continental Bank, to participate in high-calibre programs offering reduced admission to the Village The overall effect of this kind of marketing program will be assessed at year end Neil Beaudry visited the offices of the Community Information Centre of Metropolitan Toronto to discuss opportunities for Black Creek to promote special events to their clients This resulted in extensive mailing lists of various community groups, service clubs, seniors clubs, youth and children's organizations being made available. Another meeting with the City of North York's Director of Public Information provided other valuable distribution lists, to facilitate efforts in targeting information on specific Village programs to special interest groups. Moreover, this contact will prove to be very important in terms of planning special events at Black Creek for local residents. Regular communications with this office will be maintained. Lor~aine O'Byrne and several Village interpreters were interviewed on-site by CBC's Metro Morning personalities, as part of a feature segment highlighting this year's "Pioneer Festival" A feature article on the Village was written for the City of North York Development Office as part of a special eight page insert to the Financial Post, promoting North York It is due for release sometime in November. Black Creek staff promoted Village special events at the Ontario Travel Information Kiosk, Toronto Eaton Centre and Sherway Gardens Shopping centre. During the third quarter of 1983 the Village was the location for a number of commercial photography productions Segments of a movie telling the story of Tom Longboat and scenes for a new Imax feature to be shown at the Ontario Place Cinesphere were filmed in the Village: CFTO-TV recorded an episode of the children's program "Welcome To My World": the Ontario Ministry of Natural Resources' photographed a portion of a forestry documentary, and Sears used Black Creek as an outdoor location for a fashion layout The Village received newspaper coverage during June, July and August from the three Toronto dailies, as well as from many of the area weeklies. Russ Cooper attended the Heritage Canada Conference in September and also gave a talk to the east York Historical Society. Similarily, Jeanne Hughes spoke to a group of teachers at York University and later gave them a conducted tour of the Village Mrs. Hughes also gave lectures to regional museum committees in Thunder Bay and Renfrew, Ontario, re "Preparing For The Bicentennial" (c) Special Events To ensure our visitors are getting the most from their visit to Black Creek, as an added bonus to their regular admission, a large number of special events were held during July, August and September (i) The annual Muster Day was held on July 1st Black Creek's Honorary Reeve, The Honourable Pauline McGibbon, officiated at this popular event. (ill The Victorian Family Picnic was the theme for July weekends with a variety of participation activities, such as races, stilts, and hoops, which were offered for the visitors. (iii) During August weekends the emphasis in "Family Fun" was also on participation with a variety of 19th century games, such as croquet, quoits, and battledore and shuttlecock available for visitor involvement. (iv) The "Corn Fest" was offered to visitors on most weekends in September, and featured corn-on-the-cob for sale, and demonstrations of cooking with corn, corn cob animal-making, and corn husk doll-making (v) The 5th annual "Outdoor Hymn Sing" attracted its usual strong participation from seniors and religious groups in the Metro region. B-414 - 3 - (vi) Over 4,500 people attended the 27th annual "Pioneer Festival" on September 17th. Inclement weather on ~he morning of the event may have contributed to the decline in attendance this year (vii) Black Creek's 2nd annual "Honey Fair" although dampened by rain, pro- vided visitors with many fascinating demonstrations of bee-keeping techniques A very successful addition to this year's program was the refreshment tent operated by staff, and providing visitors with an opportunity to relax and enjoy a cup of hot tea along with biscuits and honey This was a good example of the kind of added service to visitors which can also provide increased revenues to the Village. During the third quarter of 1983, 22 weddings, 18 wedding receptions, and 1 banquet were held. (d) Building and Grounds Maintenance Through the summer, regular maintenance has been carried out with the assistance of the C O.E D. staff Burwick House and Flynn House have been repainted The porch at Laskay Emporium has been repaired and painted The smoke House roof was reshingled Several of the gates to Village homes have been weighted to close automatically The busy schedule of special events has meant a correspondingly busy schedule of grounds maintenance. Extra preparations and clean-up were carried out for Festival, the Honey Fair and the Hymn Sing. Construction work at the Tinamith/Hardware and the Visitors Centre has necessitated the installation of temporary hydro lines at the Village entrance. The portable has been cleared out for use by the construction company An exhaust fan has been installed at the Snack Bar Several furnaces were cleaned, shelves were installed in the Print Shop basement, a new floor was built for the stake truck box, and the rear brakes were replaced on the wagon. A backhouse was moved in from Whitchurch Township for use at the Doctor's House The Peel Regional Police Association donated a shed to Black Creek. The shed from near Norval was dismantled and brought in for re-erection at the Sawmill. eel Livestock During the summer a cow was purchased, a calf was born and a pure- bred Clydesdale colt was born Two ewes and seven lambs were sold. EXPENDITURE AND REVENEU STATEMENT JULYl TO SEPTEMBER 30, 1983 EXPENDITURE HISTORICAL YEAR % OF FORECAST SITES PROJECT TO DATE BUDGET TO {DEVELOPMENT l EXPEND. BUDGET USED DEC.31/83 232,924 l,995,000 11 7 600,000 HISTORICAL SITES PROGRAMS YEAR % OF FORECAST (OPERATIONS & TO DATE BUDGET TO MAINTENANCE l EXPEND BUDGET USED DEC 31/83 1,242,630 1,760,322 71 1,645,000 REVENUE 1983 RECEIVED % OF INCOME PROGRAM BUDGET SEPT. 30/83 RECEIVED 1,487,200 821,982 55.3 B-4l5 - 4 - FINANCIAL COMMENTS Village attendance to the end of September was 167,673, down 40,587 from 1982. Correspondingly, gate revenues are down by $70,301; gift shop revenue by $25,817; and Village outlets by $23,034 Very hot, hmnid weather was prevalent throughout the summer months which had many visitors and residents seeking water-based activities, or air-conditioned buildings In general, several other major attractions in the Metro Region such as the Ontario Science Centre, the McMichael Canadiana Collection, CN Tower, and Casa Lorna were experiencing relatively high decreases in attendance from 1982 Competition amongst tourist attractions in the Metro Region is fierce, and the big theme parks (i e. Canada's Wonderland, C N E. and Marineland & Game Farm) were all doing increased business over 1982 The number of citizens to date in 1983 is 401, compared to 409 at the same time in 1982 The ever popular Dickson Hill School Program recommenced in September and by month's end had 525 participants in a total of 3 classes. At present there exists a two year waiting list for participation in this program. ~ 1983.10 25 B-416 TO The Chairman and Members of the Executive Committee - M.T.R.C.A. Meeting tlB/B3 - Wednesday, November 2, 1983 FROM: T. E. Barber, Administrator, Information and Education Division RE INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT July 1 - September 30, 1983 CONSERVATION INFORMATION SECTION The Conservation Information Section carries out the Authority's general information program, as well as programs relating to the resource management activities and the marke~ing of the Authority's revenue generating facilities - Black Creek Pioneer Village, the Kortright Centre for Conservation and the Conservation Areas, in addition to the marketing/ communicaeions enhancement program funded by the Canada/Ontario Employment Development Program. COMMUNITY RELATIONS - INFORMATION - GENERAL Printing Highlights: - during this period, staff members put a special emphasis into a mass distribution campaign of the Authority's General Brochure and the 1983 Calendar of Events and Activities, as well as promotional brochures on the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation - a special news release was printed and distributed, regarding the Authority's reforestation programs. Tours and Special Davs: - staff made arrangements for the Glen Haffy Fishing Day, July 14, 1983 - preliminary arrangements have now been made to take The Honourable Alan Pope, Q.C., Minister of Natural Resources, on a tour of the Authority's facilities, on October l4, 1983 - a number of meetings have been held regarding the Official Opening of the Bolton Flood Control Channel, on October 14, 1983 - staff worked on a special Donors' Day, which was held at Black Creek Pioneer Village, on September 24, 1983 - Andy Watson, M.P P , Parliamentary Assistant to The Honourable Philip Andrewes, Minister of Energy, officially opened the Kortright Renewable Energy Theme on Tuesday, September 27, 1983. Staff made arrangements for the official ceremony and the receptio" which followed Special Programs: - staff spent extensive time working with the Foundation on their special fund-raising campaign for the Visitors Centre - staff attended a meeting, called by Scott Somerville, Administrator of the Town of Vaughan, held at the McMichael Canadian Collection on August 18, 1983. All tourist attractions, Chambers of Commerce and York Region representatives were invited to discuss the feasibility of developing an awareness of the Town of Vaughan. Audio-Visual ~ighlights - staff prepared an audio-visual presentation, for the Visitors Centre Special Campaign Committee of the Foundation, which was shown on September 19, 1983 - staff prepared a major slide presentation that was presented to the Authority's Review Committee in July - B-417 - 2 - COMMUNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT Printing Highlights - distribution continues of the Valley and Stream Regulations and the Waterfront Regulations, and French translations are available. They have been delivered to municipal offices and consultants, and have also been distributed at the mall promotions. Audio-Visual Highlights: - staff prepared an exhibit on watershed planning that will be used by the Ministry of Natural Resources for the next couple of months. COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING Printing Highlights - mass distribution continued during this period of the Black Creek Pioneer Village Brochure, Conservation Area Map, Calendar of Events, General Brochure, flyers on all different programs, and posters, and was carried out by Experience '83 staff and C.O.E.D staff - Pioneer Festival posters (500) and flyers (25,000) have been printed, and distribution is underway - the posters promoting Black Creek, Kortright and the Conservation Areas have proven to be very popular, as distribution continues throughout the watershed. The Black Creek Pioneer Village poster was displayed in the Liquor Control Board of Ontario outlets in the .. region, and a similar complimentary program will take place, throughout September, for the Kortright Centre for Conservation. - Brochures Unlimited continues to distribute the Black Creek, Kortright and Conservation Area Brochures in the Metro region, and throughout the Niagara Peninsula in the case of the Black Creek and Kortright Brochures - since May, an Authority enclosure has been sent out with the Ci ty of North York's water bills. This program concluded in mid-September. - staff prepared and distributed 14 news releases, 1 photo release, l4 synopses and 12 flyers, identifying and promoting programs at the Village, Kortright and the Conservation Areas, as well as 3 special profiles on Black Creek and Kortright staff - the Authority subscribes to the MacLean Hunter Press Clipping Service and, for this period, received approximately 665 press clips, which is only a sample of the coverage the Authority receives - printing of 20,000 copies of the Wintertime Good Times brochure (distribution is underway). Special Programs - staff attends regular meetings of the Attractions Council of the Metropolitan Toronto Convention and Visitors Association, as well as the Executive Meetings - considerable work and planning went into developing the Visitors Survey. The summer portion of the survey has been completed and the material is being key-punched by staff. - the telephone answering sales program on evenings, weekends and holidays has proven to be very successful As a result, this program will continue for the rest of the year, on weekends and holidays only. Since April, a total of 10,167 calls have been serviced. - Teleguide units have been installed at Black Creek Pioneer Village, the Kortright Centre, Indian Line Tourist Campground and the Head Office, and there have been a number of meetings with Infomart to discuss the 1984 programs - the multilingual television station, Channel 47, promoted the the Authority's recreational facilities during the summer This was a Contra deal, with the Authority providing family passes in return for television promotions - the word processing equipment is now being used to enhance the marketing of our facilities and programs. B-418 - 3 - Audio-Visual Hiahlights: _ fall television promotions were sent to all the Southern Ontario television stations, promoting Black Creek, Kortright and the Conservation Areas _ arrangements were made and exhibits were set up at - Royal Bank Plaza - Shopper's World (Albion) - Bridlewood Mall - Yorkda1e Shopping Centre - Westwood Mall - Sherway Gardens - Mississauga Square One - Bramalea City Centre - Milton Mall as well as at the Flax Festival, York University, in conjunction with Black Creek Pioneer Village. Advertising and Promotion - arranged for special publicity features with: a) Canada Century Home b) Metropolitan Toronto Convention and Visitors Association - Happenings (bi-month1y) c) York University Athletic Calendar d) Woodall's Tenting Directory e) Trailer Life's Directory f) Around Canada's Wonderland - brochures have been distributed at Ontario Ski Shows, as per an agreement with the Ontario Ski Council. Canada/Ontario Employment Development proaram: The Authority's Marketing/Communications Program has been substantially enhanced with the hiring of one Project Coordinator and five staff members under the Canada/Ontario Employment Development Program. These employees are carrying out an extensive Visitors Survey at all of the Authority's facilities and have recently been distributing literature, posters and flyers, throughout the watershed, promoting the programs and facilities. Program staff are also assisting with the telephone answering service, and are working with Woods Gordon personnel in data collection. CONSERVATION EDUCATION SECTION Kortright Centre for Conservation _ general pUblic summer attendance was down slightly from last year, but the group program attendance increased over the same period in 1982 - a reception was held in early July to mark the opening of the widlife art exhibit by Michael Dumas; during August and September the "Kaleidoscope of Crafts" exhibit, composed of works from Community Colleges and sponsored by the Ontario Craft Council, was on display at Kortright after a successful showing at the World University Games in Edmonton - of all the resource-related programs offered, the Bee Program is the most popular, followed by programs about insects and the regular nature hikes: in September there is the Honey Festival, Moccasin Walk and a special wine-making program - special functions during the summer included several wedding receptions, evening meetings. A small ceremony to mark the official opening of the Renewable Energy Theme Program and the arrival of the 10,000 watt horizontal axis windmill was held on September 27, 1983, co-hosted by the Ministries of Energy and Natural Resources and the Authority, with Parliamentary Assistant Andy Watson officiatin~ . 4 . B-419 - 4 - - thanks to a variety of government sponsored, labour-intensive programs and funds raised by the Foundation and the various Ministries, several projects are currently under development or just completed - a forestry path with self-guiding trail using tape players, several slide presen- tations, permanent seating in the theatre/seminar room, and a proposal under consideration for a self-guiding mechanism for all trails. Self-guiding mechanisms provide for greater efficiency at reduced labour costs, but much the same level of program - the Energy Theme Program has now completed the initial energy trail construction and the installation of solar thermal coolers and a grid connected 1,200 watt photovoltaic array, to provide energy to a residence on site Day Programs - Black Creek Pioneer Village: - Black Creek Education staff provided a six week program during July and August as one of the Canadian Studies component of "Discovery S ununer '83" - a summer mini university for 10-14 year olds conducted by York University. 401 students attended in total and enjoyed an excellent participatory program Program informational material has been sent to the School Boards as well as to man~ independent schools in the area, to coincide with the commencement of the academic year - Scarborough and Metro Separate Boards of Education have once again booked large blocks of time for their students in both the Pioneer Life Prograffi and the Educational Tours. Generally, the celebrations of Ontario's Bicentennial and Toronto's Sesquicentennial will give added impetus to all the programs - the Trip in Time program, in conjunction with York University, is gearing up for another year with an increased number of topics and hence a linkage with new departments - plans are underway for the orientation and training of new volunteers for the Pioneer Life Program. The volunteer complement for this school year will be 15 in number Residential Field Centres - Albion Hills, Boyd, Claremont, Lake St George Summer Programs - 3 week senior secondary level credit courses in Archaeology at Boyd (sponsored by the North York Board) and in Environmental Studies at Lake St. George (Toronto Board sponsored) - York University 3 week third year Geography credit. course at Albion Hills - March of Dimes 5 week summer camp for disabled adults at Albion Hills and Claremont - 5 weeks of residential courses for English as a Second Language (E S L ) students and 4 weeks of Art and Nature courses for junior/intermediate students - all sponsored by the North York Board - Peel Regional Police 5 day safety training course for crossing guards at Albion Hills - Canadian Ski Patrol leadership training course at Claremont 5 B-420 - 5 - Canada/Ontario Employment Development Program Participation in the C.O.E.D. Program has, to-date, resulted in the completion of the energy house, the continued construcion and maintenance of trails, continued development of forestry projects and the complete staining and painting of the main building at Kortright Other projects within the C.O.E.D. Program include rebuilding of outdoor stone stairs at the Boyd Conservation Field Centre and provision of a second shift of workmen for a ten day period, to assist in the complete renovation of the main student washrooms at the Albion Hills Conservation Field Centre. Construction of a new roof is also in progress at Albion Hills. At Lake St. George, the completion of the waterfront project (dock, boathouse, canoe storage, campfire facilities and landscaping was accomplished under C.O E.D. Etobicoke.Environmental Education Centre - Albion Hills Construction is progressing, with the completion date scheduled for early March, 1984. FINANCIAL COMMENTS All programs are forecasted to be on target at the present time, with the exception of Operations and Maintenance at the Kortright Centre for Conservation. Attendance at Kqrtright is forecasted to be down by approximately 3,000 visitors from the 1982 figures. This Centre may, at best, break even on Operations, and at worst have a deficit of $12,000, depending on attendance and revenue during the last quarter of the year. It is anticipated that any deficit that may occur will be offset within the Division by either surpluses or unexpended funds TEB/mrp 1983 10 26 ,. -, CD , I i I .e. , N I !-' , I I I I I J ---- "': )- OPERATJNQ STATEPlENT PAQE II 10 8Y PROQRAtt PERIOD ENDI~ 831002 REP: 109 ') ItJI E X PEN D I T U RES REVENUE I ~ - ----- - ......c................__..~.....___..__......._____. .......-..........................~-- "-T-D Y-T-D " .U.I~ tt-T-D Y-T-D " 'l 8UDQET ACTUAL ACTUAL EXP IIllnoET ..r...w.. .r:TU_~gD ...-- --.. -.-.- -- ---... ...-- --- --- --- INFOR"ATION . EDUCATION 'l ----..........-........ ------ ~~iNISTR~TION~-i . E 4111.370 29.660 279.3b2 67 3 136.008 41110 370 240- 1 ~ COI'1ItUNITY RELATIONS - INFORM BO. 127 3.003 ll6.BOl 33.11 113.326 BO. 127 0 1ft ClJI'W1UNlTY RELI'ITlDHII - I~ORM 11.000 1 . 0116 9.9 9.914 11.000 0 ~ ~ ---- -- ----- -- COI'll'IUNITY R,ELATlONS - INFORM 90.243 3.714 72.917 SO. 8 17.326 9().243 0 :) ,..IELD CENTRE - OPERATIONS 1.273.083 96.962 883.701 69.4 389.383 1.273.083 61.1~ 7411.889- 118.6 KORTR I QHT 442.000 31.212 314.324 71 1 127.676 442.000 111.282- 168. 343- 38.1 ::) --- - - - --- - CONSERVATION EDUCATJDN-DEVELO 114.800 2.722 2,722 2.4 11 2. 078 114.800 0 , ---------------------------------------------------- ------------------- ;II TOTAL 2.426.623 167.273 1. 1180. 913 611.2 8411.710 2.426.623 76.3'15- 914,471- 37 7 ::J - - - ~ERAHCE'S ARE NOT INCLUDED I~ THE ACTUAL ;) KORTRIGBT - RENEWABLE ENERGY THEME PROGRAM $183.493 149.900 8U 33,593 J , -- -----. .Does not inolude Municipal Levy, Provinoial Grant and interest on the Growtb Endowment Fund (9 months of the year) \U ~ - B-422 TO THE CHAl:RMAN AND MEMBERS O;F THE EXECUTJ:VE COW1:I:TTEE, M.T R.C.A. - Meeting U 7/83 FROM: MR J C. MATHER, ADMINISTMTOR, WATER RESOURCE DrVISION RE WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1~83 TO SEPTEMBER 30, l~83 . The attached progress report is presented for the period July 1, 1983 to September 30, 1983 The report details Doth the physical and financial progress of the various programs and projects in the Flood Control and Waterfront Sections Also included is a status report on the Fill Violations as prepared by the Development Control Section Attachments 1983 10.26 JCM/md CD J ~ I -0l- "'" - w OPERATING STATEMENT PAGE 2 10 3Y PROGRAM PERIOD ENDING 831002 REP 109 E X PEN D I T U RES REV E N U E ---. ;~c===:=;=================~========~=====~c=~=====-== =~==Q===~=~~=~=======R=C====~=========~ M-T-D Y-T-D ;, FUNDS H-T-D Y-T-D ;, BUDGET ACTUAL ACTUAL EXP - ---- __ =4E_ ===:;:::u= -=- -==-==-== C:~=_== -= === =__ z:z= ===;:1 'I , ~A1ER RESOURCE - FLOOD CONTROL =~====:_====================== ADNINISTRATION-FLODD CONTROC- 743,652 56, 167 586,690 78. 9 156,962 743,652 8,315- 1 1 METRO EROSION CONTROL 396,000 40,283 220,206 55. 5 176,294 YORK - EROSION CONTROL 23.500 254 10,375 44 2 13, 125 23, 500 1,400- 6 0 Pc~L - EROSION CONTROL - -- -- -- 35, 600- -- 0 35,600 35,600 0 DURHAM - EROSION CONTROL 5.000 0 5,000 5.000 PLANNING AND REMEDIAL MEASURE 1, 343, 500 168,279 720,737 53. 7 622,763 1,343,500 0 ' I J j ) RIVER FORECASTIN~dp 8< MAIN 119,637 7,734 75,620 63. 2 44,017 119,637 0 S/"lALL DAMS, CHAN. &: ER CONT 244,000 26,480 193,757 79 4 50,243 24 , 1 ----------------------------------------------------- -----------~--------------------------- TOTAL 2,911,389 _ ~9,!! ! 97 _ 1~ ~Q11 385 __1l~~.l.d_Q~..QQ9---2~UL3B9 6. 190- 43...805=----1_ 5 - -- ---- -- - ---- ------------------------------------------------------ --------------------------------------- ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL , , " _.---~- --- - - - - -- - - ) --. -. ) - -- - ------ - - - I l' ~ \ BY PROORAM PERIOD ENDING 831002 REP 10"" , -- E X PEN D I T U RES REV E N U E --. - - -- ----- ---- C==D.a~mzc~=~=_a.C=_~~G~a==a.~~a.~=..CG=m~=.C_O==Dg.Q ..~_Cg_~_..GG.aG___aa_.a.__D.c..a.c_c.m M-T-D Y-T-D " FUNDS M-T-D Y-T-D " BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ~AL RJ:'r.n ) _CI:8a= ._.a~D ...sm_ .... ClDmac.mlll'D ca....G ____0. __:aaI:aQ a;;::Ia:a I . WATER RESOURCE - WATERFRONT =~=__~:m~...g._.D_g__a_aaa_ -- ---- ADMINISTRATION-WATERFRONT 211,239 23,642 169,765 80 4 41,474 211,239 3'1- 2 CAPITAL DEVELOPMENT I,D31,261 97,4'2 847,786 '5.4 683,475 1,531,261 3.950- 35,270- 2.3 SHORELINE MANAGEMENT 582,500 17,749 28,071 4 8 554,429 582,500 0 --- -- MAINTENANCE 0 0 ----------------------------------------------------- --------------------------------------- TOTAL 2,325,000 138,843 1.045,623 45.0 1,279,377 2,325,000 3,950- 35,621- 1 5 J ----------------------------------------------------- --------------------------------------- --- --ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL -- ---- - - - -- --- - -- --- --~ ---- ~ --- - - ---- - - --- --- --- ------- ---- I ~ - - - - ------- i CD I 01>- IV 01>- -- --- - - -- I -- --- B-425 - 2 - FLOOD CONTROL Erosion Control Metro Major remedial works have been completed at the Wynford Heights Crescent site in the City of North York Private revenues in the amount of $27,900 00 which were received this year but not included in the budget figure are reflected in the overall expenditure for this activity Major work at Beaucourt Road has been completed Major work at Delroy Drive on the Mimico Creek is scheduled to commence by the middle of October, 1983 and be completed before the end of the year Erosion Control - Peel Remedial work at Albert Street in Bolton is scheduled for later this year Erosion Control - York Remedial works at Kirby Sideroad have been completed. Private revenues in the amount of $1,400 00 which were received this year but not included in the budget figure are reflected in the overall expenditures for this activity MAINTENANCE Major maintenance in the Lower Humber Channels has been completed The rehabilitation of the palgr.ve Dam is in progress Regular maintenance of our water control structures has been carried out within the established budget guidelines PLANNING AND REMEDIAL MEASURES Remedial Works Channel improvement works have been in progress on the Main Branch of the Humber River in Bolton Work for the Phase I of the Bolton Project has been completed The contract for Phase II of the Bolton Project was tendered and awarded to Sonterlan Construction Corporation Work is now in progress and will be completed by the end of the year Erosion control remedial works have been initiated on the Highland Creek as outlined in the Highland Creek Project 1983 Work on the first site has been completed while work on the second site is in progress Keating Channel Study The Keating Channel Environmental Assessment report has been formally submitted to the Ministry of the Environment for their review Environmental Planning Collection of background data for input into Master Drainage Planning is ongoing The land use map has been updated to reflect 1983 status A detailed examination of flood susceptible areas is underway Field studies are complete for the Environmental Inventories for the erosion control program Reports will be drafted in the near future /3 - 3 - 8-426 WATERFRONT ========== Colonel Samuel Smith Waterfront Area - Landfilling commenced on June l, 1983 but progress is behind schedule due to limited constructxon act~vity. To the end of ~eptemDer, a total of 7,410 loads of material have been received and l.06 hectares of land have been created - The 1andfil1ing program for the winter months is under review with the Ministry of the Environment. - The number of names on the waiting list for moorings now totals 133, an increase of 8 over the reporting period - The City of Etobicoke, Humber College and the Ministry of Government Services are all involved in a planning review of the future of the Lakeshore Psychiatric Hospital - Detail planning of the final park layout is continuing in conjunction with Metro Parks Department and Humber College. - Acquisition of the Provincial Crown Waterlot is proceeding Humber Bay West . - Landscaping around the new launching facility is complete - The Boating Clubs are continuing with plans for their clubhouses and a building permit has been issued for immediate construction on the Mimico Cruising Club's building - A master plan amendment to increase the mooring capacity from 500 boats to 700 boats is under consideration by Metropolitan Toronto and Etobicoke. - A clean up of debris in the mouth of Mimico Creek was completed - Minor deficiencies throughout the site are being rectified in preparation for final transfer of the entire site to Metropolitan Toronto Western Beaches - The recent concern about water quality along Metro beaches -has sparked renewed interest in the Authority's development program and in particular the hydraulic improvement at the mouth of the Humber River Discussions are underway with Metropolitan Toronto regarding early implementation of the hydraulic improvement Aquatic Park - The legal survey delineating the various property transactions that are to take place is expected to be complete by November 1, 1983 - The Aquatic Park Planning Task Force is establishing guidelines for public participation in the planning exercise - Progress on the construction of the endikement has been slower than anticipated, however a total of 1.39 hectares of land has been created in 1983 Ashbridge I s Bay, - The detailed planning of dredg~ng works required for 1984 is underway- in conjunction with Metro Works Department and the Toronto Harbour Commissioners /4 B-427 - 4 - Bluffers Toplands - Restoration of former Fishleigh riltration ~lant site is substantially complete following tree and shrub planting and turf estaolishment. - A contract has been awarded for paving of the entrance road and parking lot - Plans are being reviewed for the proposed development of the former Seminary lands in an effort to address some of the concern$ of local residents Bluffers Park - The contract for paving of the roadway to the easterly end of the site and the public parking lot adjacent to the swimming beach is underway. - The fall planting is underway and upon completion the landscaping of Phase II will be substantially complete - All 4 Boat Clubs enjoyed successful summer seasons and arrangements for haulout of boats are in place The clubhouse at Bluffers Park Yacht Club is nearing completion All clubs undertook landscaping improvements - A market analysis and cash flow study for the proposed marina has been undertaken and the terms of reference for the proposal call will be finalized in the near future. - Erosion control work in Sunnypoint Ravine and along the base of the bluffs adjacent to Phase II is nearing completion for 1983 Further works are required throughout this sector in future years East Point Park - Detail planning of the road alignment and parking lot locations as well as the stream and pond system is under review In addition, the details of electrical supply and sanitary sewers are being planned It is anticipated that some construction on the roadway and parking lot will proceed in the Fall - The City of Scarborough is reviewing its plans for a playing field complex at the westerly end of the park Initial construction of the playing fields is tentatively planned for the Spring of 1984 Ajax Waterfront - Detailed planning of works to be implemented by M T.R C.A , Town of Ajax, the Rotary Club and Wimpey Construction is underway Shoreline Management - Shoreline protection work for the Fallingbrook Drive area of Scarborough is underway This work depends on access through the Toronto Hunt property. - Shoreline protection work is underway for the South Marine Drive area with the first stage consisting of construction of an access roadway across the frontage of the Guild Inn property - Property negotiations are continuing in preparation for shoreline protection along Springbank Avenue and Lakehurst Crescent - A Project for Erosion Control in Bellamy Ravine was adopted by the Authority and Metropolitan Toronto Funding arrangements are now under consideration by the City of Etobicoke and the Ministry of Natural Resources /5 B-428 - 5 - Envi~onrnent~l Monito~ing - The results of the 1982 wat~front monitoring program are being compiled in report fo~m - Automatic temperature recorder~ are still in place and will ~e changed in November - The 1983 program is nearly complete with Proctor and Redfern Limited completing sample analyses - The 1983 field program at Colonel Samuel smith waterfront Area is underway following discussions with the Ministry of the Environment on sample procedures and fill quality monitoring - A review of the 1984 program wil~ be discussed with the Ministry of the Environment to incorporate changes to the monitoring program in view of findings to date - A request for exemption to The Environmental Assessment Act for the South Marine Drive stabilization project was prepared and submitted to the Minister, Ministry of the Environment BED/BH/md CD - THE CHAIRMAN AND MEMBERS OF THE EXEClJTIVE <J.:l.1MITl'EE, M.T.R.C.A., - 1117/83 I W: PAGE I .e. N JOHN W. MALEl'ICH, Ml\NI\GER, DEVEIDIMENl' CCNrnOL SOCTIOO \D FRCM: BE: AIMINISTRATION OF oomRIO RmJIATIOO 170 - JULY, JlUGUST AND SEP'nMBER, 1983 DETAILS OF VIOLATION NOTICE Em'. OPE ACTION TAKEN LOCATION INITIALS Town of Ridurond Hill V-S03, Mr. Povina Turk Jl.H -All filling stDpped and area partially lDt 26, Plan M-1739 July 6, 1983 restored. 15 r-bodie Drive ('Ihornhill) 3 (b) DJn River Watershed Town of Ridmond Hill V-S04, Mr. Pasquale Marchese Jl.H -Resolved by site plan agreerrent. Part lDts 41 & 42, Plan 2027 July 0, 1983 Penberton lbad 3 (b) Don River Watershed Town of Pickering V-50S, SiJron & Wilhelmina Il'l -Activity stowed and fill raroved. S. pt. lDt 18, Con. 2 Wanrerdam -Disturbed areas restored. 1718 & 1726 Finch Avenue V-S06, Marjorie Villeneuve Duffin Creek Watershed July 8, 1983 3 (b) and 3 (0) Town of Vaughan V-S07, Luca Tesa & Giovanni. Conti [M -Fill ra\'oved and structure relocated. West side of Islington Avenue (Ea:many Fanners Mal:ket) -Approved under Penni.t B-098. South of Hwy. 7 V-S08, Ministry of Governrrent Hurber River Watershed Services July 13, 1983 3(a) and 3(b) City of l'brth YOIX V-S09, Mr Peter Nitti [M -l~illing stowed. lDt 13, Con. 6, WYS July 21, 1983 -o.mer discussing restoration with staff. 2924 Weston Ibad 3(b) Hunber River Watershed /L. 1983.09 30 'ID: '!HE 0IAIlMW AND MEMBERS OF '!HE EXEDJT1VE CXHnTlEE, M.T.R.C.A., - i 17/83 PlIGE II FKM: JOON W. Ml\LEl'ICH, MAN1\GER, DEVEUlPMENl' CDll'ROL SEX:'l'ICN. RE: AIMINISTRATIOO OF wrARIO REXmATI~ 170 - JULY, AUQJST AND SEPTEMBER, 1983 LOCATION DETAILS OF VIOLATION NOTICE Em'. en ACTION TAKEN INITIALS 'l'atm of Pickering V-510, 358016 Ontario Limited I:M -Q1anne1 cx:rrp1eted through approval Part Lot 33, Cbn. 1, V-5ll, Goryn Construction fran Pickering. , Lots 10 and 11, JUly 22, 1983 Pettiooat Creek Watershed 3(c) 'l'atm of Vaughan V-512, Mrs. Bessie Lund IM -Filling stowed. Part Lot 10, Cbnoession 7 (Joy Valley Greenhouses) -Area restored. Huroer River Watershed V-513, Mr. J05eli1 Nagy August 4, 1983 3 (b) City of Etobiooke V-514, Mr. Irvin Garten IM -Filling stopped. Lots 3 & 4, Plan 1217 V-51S, Mr Jolm Szustaczek -Area restored and access closed. 2515 & 2511 Lakeshore !bad V-516, Mr. Mayer Garten Waterfront V-517, Mr. Frank Rak August 10, 1983 3(b) 'l'cMn of Ridurond Hill V-518, Mr. Henry Natale JlW -No further activity has been uOOertaken Part Lot 64, Con. lW AUJUSt 16, 1983 Huroer River Watershed 3(c) in the waterrourse. City of Scal:borough V-519, 382284 Ontario Ltd. I:M -Activity stopped, fill raooved, restoration North side of Sheppard Ave. E., August 25, 1983 with top soil & seed rot done. RlUJe River Watershed 3 (b) /L. w , 1983.09.30 "" w 0 01 I ",. w ..... '10: THE CHAIR-Il\N l\ND MEMBERS OF THE EXEXlJTIVE a:J+II'rlEE, M. T .R.C.A., - i 17(83 PAGE III FIQ.!: J<EN W. Mi\LEl'ICH, H1\Nl\GER, DEVEI.OPMI:1>ll CCNl'ROL SEX:'l'IW REI AI:MINISTRATIrn OF CNrARIO REnJIATIm 170 - JULY, AlJQJST l\ND SEP'InlBER, 1983 LOCATION DETAILS OF VIOLATION NOTICE ~....:....~ ACTION TAKEN 'lWn of Pickering V-520, Mr & Mrs. 'll1anas Newm:ln IJI'l -Restoration underway l.U'lder staff direction. North pt. lDt 9, COn. 6 August 25, 1983 Carruthers Creek Watershed 3(c) City of Etabiooke V-521, Martinway COntracting Ltd. rM -Fill rem.:>ved and area restored. Rear of III Disoo !bad August 25, 1983 Mimioo Creek Watershed 3 (b) ~ 'lWn of Pickering V-522, The Municipal Clerk IJI'l -Letter received 1983.10.06 indicating North pt. lDt 12, Con. 5 of the 'lWn of Pickering fill will be rerroved and area reshaped. Duffin creek watershed AU3USt 31, 1983 3 (b) City of Mississauga. V-523, Lapo Managarent Ltd. AW -Site restoration work in aocx:>rdanoe ~ lDt 12, COn. 3, EHS September 14, 1983 with staff requi.renents has beP..n initiated. Etobiooke Creek Watershed 3(b) 'lWn of Pickering V-524, Pentea:>stal Assenblies IJI'l -Fill :renoved fran slope, area Part lDt 13, COncession 3 of canada regraded, topsoiled and seeded. North side of 3rd COncession !bad V-525, VerrD':f Excavating Duffin creek Watershed September 14, 1983 3 (b) fL. 1983.09.30 '10: THE ~ J\ND MEMBERS OF THE EXEXl1l'IVE CXHIlTIEE, M.T.R.C.A., - . 17/83 PAGE IV F1D1: JCIIN W. Ml\LEl'ICH, Ml\NAGER, DEVElDl'HE1ll' CCNl'ROL SEX::'l'Irn. RE: MMINISTRATIaI OF amuuo REXmATI~ 170 - JULY, l\lGJST, AND SEPTFMBER, 1983. LOCATION DETAILS OF VIOLATION NOTICE ENF. CFF ACTION TAKEN City of Branpton V-526, Gennaro & ~ DiGrecFrio m -Fesolved via the restoration of the IDt 14, Plan M-232 V-527, Dc:mi.nion Paving Ltd. wateroourse to its original d1annel. 8th Line !bad September 19, 1983 Hunber River Watershed 3(c) TcMn of Vaughan V-528, Vaughan Nurseries [M -Filling stopped and amer discussing South side of Rutherford Rd. September 19, 1983 west of Keele Street 3 (b) restoration with staff. [))n River Watershed , .. fL. w I 1983.09 30 ~ W N B-433 TO The Chairman and Members of the Executive Committee M T R C A - Meeting #17/83 FROM P B Flood, Administrator Conservation Land Management Division RE Conservation Land Management Division PROGRESS REPORT PROGRAM ADMINISTRATION This report covers events, activities and project accomplishments to September 30 Considerable administrative staff time continues to be spent in coordinating projects under various special employment projects The largest project, COED ($820,000 and up to 57 employees) commenced in April and progress on projects is well underway CCDP Programs are continuing in York-Peel and Brampton-Georgetown ridings. The Ontario Riding project has concluded The Experience '83 program commenced in May and employed 26 students on various projects to the end of August Under the Provincial Works Sector Program, the Fisheries Enhancement and Parks Sector projects concluded in May The Forestry Stimulation project continues and a new project - Parks Sector and Conservation Area Improvement - is underway Staff are preparing submissions for Conservation Area Development, Operations and Conservation Land Management Projects, for the Canada Works Program WATERSHED RECREATION - PLANNING The master planning study for the Boyd Conservation Area is in its final stages of completion A prefered plan has been selected and presented to the public at an open house on September 15 Comments received from this and subsequent meetings with the Town of Vaughan and various ratepayers groups have been incorporated where feasible, into the plan. The study team is currently working on the details of the design and costing of the Master Plan This information will be presented in draft report form to the Region of York, Town of Vaughan and Metropolitan Toronto for comment prior to finalization and approval by the Authority In addition to the Boyd Study, the Authority under the COED Program, has been working on master plans for the Albion Hills, Clareville and Heart Lake Conservation Areas Grounds maintenance plans, detailing turf management, tree and shrub maintenance and future planting program for each of the Authority's recreational use areas are also being prepared WATERSHED RECREATION - DEVELOPMENT The construction of the Indian Line residence/control building and the Albion Hills washroom and picnic shelter is underway Foundations for all buildings have been completed and the exterior shell of the Indian Line residence building has been constructed At Albion Hills a 200 amp hydro line to service for the washroom and picnic facilities has been installed Under the COED program, a 250 sq ft extension to the Cold Creek trap range building has been constructed At Bruce's Mill, major structural repairs have been made to the grist mill The COED program has also provided the Authority with an opportunity to update and standardize Conservation Area signage New routed signs have been completed for several areas In addition, a prototype of the Authority's new area information sign has been constructed and is ready for installation at Cold Creek B-434 PROGRESS REPORT PAGE 2 The COED program has also provided the Authority with an opportunity to update and standardize Conservation Area signage To date, a detailed inventory of all existing signage has been completed Production of new signs is underway using a recently acquired routing machine The painting of several Authority buildings has also been undertaken using COED labour WATERSHED RECREATION - OPERATIONS During the first quarter of 1983, the usual 6 Conservation and 2 Forest and Wildlife Areas were open for public use Due to the abnormal lack of snow normal winter recreation activities were not possible. The Albion Hills and Bruce's Mill ski programs were able to offer limited facilities on 3 and 2 weekends respectively Only 5 groups at Albion Hills and 2 groups at Bruce's Mill were able to participate in the instructional program In an effort to reduce costs ski staff were released early None of the scheduled winter Special Events were held The monthly Retriever Trials commenced in March at both Clairevi11e and Cold Creek The Bruce's Mill Maple Syrup Demonstration began the first weekend of March, a week earlier than usual Attendance for organized school tours was 4281, a decrease of 502 over last year General public attendance was 14,249, an increase of 507 over 1982 During January, the annual delivery of 45,000 Rainbow Trout fry was received at the Glen Haffy hatchery This fish will provide the "Put and Take" stocking supply for the Glen Haffy ponds, Heart Lake and other Areas in 1984 In July, a successful "Fish Derby" was held with 8 lucky anglers catching tagged fish and winning prizes donated by Molson's and Ruko Canada The lack of winter recreation activity permitted Area staff to carry out more than the usual amount of routine maintenance and repairs to buildings, grounds and facilities This work was augmented by 2 Special Employment programs At Bruce's Mill, 2 young workers were employed under the Winter Experience Program to assist with maintenance and program preparations At Claireville, Heart Lake and Boyd Areas, 2 3-man crews started work under the 1983 Canada Community Development Program (CCDP) These workers assisted with building and picnic table cleaning and painting and also accomplished considerable landscape tree pruning in picnic areas This program continued throughout the summer and expanded to all Areas Under the Authority's COED program, 10 workers have been hired to assist Conservation Area staff with regular operations and maintenance These additional workers have assisted in upgrading maintenance standards to levels in previous years A crew of 3 workers is at Indian Line Campground carrying out new planting and maintaining all plantings They also assist in all ground maintenance work at the campground The Experience '83 program has provided 2 crews of three students to work on Area nature trails At Clairevil1e and Heart Lake, pruning and surfacing has been completed along with preliminary assessment of the Albion Hills trail The eastern crew has completed pruning and surface improvements to trails at Bruce's Mill, Greenwood and Petticoat Creek An additional 13 students have been employed as gate and boat concession attendants At Cold Creek, 119 people attended the six Hunter Education Courses conducted by the Area Superintendent In response to demand, section staff, in consultation with I&E Division staff, have revamped the Shooting Skills Program for school groups and this program is being offered to grades 7 and up starting in September During the winter, Sporting Clubs have used the ranges for 2 "Ham Shoot" competitions The Upper Canada Rifle Association has held a monthly event during April - June and September In June, the National Golden Retriever Trials were held at Cold Creek The Radio Controlled Flying Club of Toronto hosted it's annual Fly-In in early August All Areas were in operation for summer activities by early May with the 7 swimming areas opening as scheduled the first weekend of June During July and early August, high bacteria counts resulted in the closing of Boyd, Claireville and Bruce's Mill swimming areas Bad algae growth at Heart Lake has also forced periodic closing of that swimming area At Heart Lake, a public boating program was established opening the lake to private non-motorized water craft The weekend ORCA canoe instruction programs at Claireville have again been well received with 58 participants attending the 8 courses B-435 PROGRESS REPORT PAGE 3 In an effort to reducing operating costs, the group (school) instructional program was dropped However, equipment has been rented to 3 groups to run their own program The Claireville water ski site has been used for 4 tournamen~s including the Ontario Championships At Albion Hills, the Rambling Hills Riding Club has held their monthly horse show The new public riding program at Claireville began operation in June To date, user comments have been very favourable and attendance is growing During the winter, Petticoat Creek staff again carried out the annual inventory of all Authority vehicles and equipment and the annual inventory for the Land Management Division of all Area tools, equipment and furnishings Division staff have devoted considerable time to preparation and processing of Tenders for the Authority's acquisition of replacement vehicles, tractors and equipment All items including 5 replacement trucks and 4 tractors, have been received Through the winter, Division staff organized a training seminar on Chainsaw maintenance and safe "felling" techniques This program sponsored by the Ontario Pulp and Paper Makers Safety Association was attended by staff from various Authority locations and has been very favourably received by all attending It is a valuable addition to the Authority safety program A tractor maintenance seminar sponsored by the Ford Motor Company was held for operating staff involved in tractor operation. Two Conservation Area supervisors and the Safety Officer attended the MNR Enforcement Course and successfully passed the test requirements They will be eligible for future appointment as Provincial Offences Officers to enforce the Authority's Conservation Area Regulations In early July, all lifeguard staff attended a two day cardio pulmonary resucitation course to improve the level of lifesaving skills available for emergencies Division staff have been actively involved in promoting Area recreation facilities by staffing displays at the Camping on Wheels and the Canadian National Sportsmens Shows Emphasis in both displays was on Conservation Area recreation facilities Revisions have been completed and updated information pamphlets printed for campground operations, boating programs and range operation Copy for the individual Area brochures was revised in preparation for printing The Bruce's Mill and Claireville brochures are available with other Areas to follow shortly Considerable input was provided by Division staff into the preparation of the new "Conservation Areas Brochure" This brochure has been well received by Area visitors. The following table shows Area attendance for the period January 3 to September 30, 1983 It shows a decrease of 19,789 people or 2~ over the same period in 1982 Summer attendance (June to August) is up over last year by 79,22l The closing of swimming areas, due to high bacteria content, prevented summer attendance increases from offsetting winter (January to March, 66,864) and spring (April/May; 39,825) decreases ATTENDANCE AT CONSERVATION AREAS, JANUARY TO SEPTEMBER 30, 1983 1983 1982 ALBION HILLS 120,840 141,631 BOYD 128,712 136,691 BRUCE'S MILL 141,869 154,767 CLAIREVILLE 117,176 128,988 COLD CREEK 31,300 29,481 GLEN HAFFY 52,038 62,194 GREENWOOD 56, 183 60,106 HEART LAKE 89,271 75,364 INDIAN LINE 51,679 56,644 PALGRAVE 334 9,509 PETTICOAT CREEK 156,008 110,671 WOODBRIDGE 12,905 12,058 958,315 978,104 B-436 PROGRESS REPORT PAGE 4 CONSERVATION LAND MANAGEMENT PROGRAM Job creation programs funded by the Federal and Provincial Governments have enabled the Authority to accelerate resource management projects on Authority, public and privately owned lands within the watershed On Authority owned lands, staff hired under the Canada Community Development Program and the Parks Work Sector Program carried out woodlot and plantation management programs in the following locations Bolton Resource Management Tract (201 cu m /56 cords of firewood), Glen Haffy Forest and Wildlife Area (432 cu m /120 cords of pulpwood and 1600 meters of fireguard maintenance), Glen Major Resource Management Tract (1500 meters of firegaurd development) The Bruce's Mill Conservation Area produced 45 cU.m /12 cords of firewood this past winter Since May, staff on the COED and Forest Stimulation Programs have continued with forest management Four hectares of plantation in the Glen Haffy Forest and Wildlife Area have been thinned An estimated 400m3 (110 cords) of merchantable pulpwood and 450m (125 cords) undersize firewood quality pine has been produced Approximately 4,500m of firebreaks and forest access roads have been upgraded in the Glen Major Resource Management Tract and the Glen Haffy Forest and Wildlife Area This work involved grading, grass seeding, brush and rock removal and prunning Forest management work including thinning selective cutting and fireguard maintenance will continue through the fall utilizing the Parks Sector and COED job creation programs Sites include the Glen Haffy Palgrave, Claremont and Glen Major Areas As part of the Resource Management Tract Program, Area staff have continued to maintain existing fireguards in the Glen Major, Goodwood, Glen Haffy and Palgrave Areas Twenty three hundred meters of fencing have been constructed in the Bolton and Nashville Resource Management Tracts to control unauthorized motor vehicle access and garbage dumping The Parks Sector Job Creation Program has provided the labour and materials for this work. Additional fencing will be completed in Claireville and/or the Snelgrove Resource Management Tract as part of this program Under the Fisheries Work Sector Program, which started in the fall of 1982, staff developed and posted 8 km of fishing trails in the Bolton Resource Management Tract and 4 km. in the Claremont Forest and Wildlife Area Six fishing piers were also constructed for the C1aireville Conservation Area It is anticipated that the installation of these piers will enhance the fishing opportunities in the reservoir This summer, the Authority took part in the Conservation Services Experience '83 Sub-Program A total of 560 meters of cold water fish habitat was improved on two private properties located on the headwaters of the Humber River Eroding streambanks were stabilized and artificial bank covers, deflectors and in-stream boulders were installed On a third private property a 80m eroding streambank was stabilized The Authority has also worked in co-operation with Save Our Streams, an organization dedicated to enhancing fisheries habitat To date, they have completed stream improvement projects in the Claremont and Palgrave Forest and Wildlife Areas It is their intent to erect signs on location acknowledging the contribution of M T R C A. Reforestation projects have been completed on Authority lands with 50,000 seedlings planted at the Glen Major Resource Management Tract, 6,000 at the Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and Wildlife Area Boy Scout groups have planted 10,000 seedlings at the Bolton Resource Management Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd Conservation Area, and 10,000 at the Glen Major Resource Management Tract Planning projects for resource management programs on Authority owned lands are continuing Regular staff and those working on the Forest Stimulation, COED and Parks Sector Work Programs have undertaken forest inventories on 10 properties including Bolton Resource Mgt Tract Kolodziej Forest & Wildlife Area Nashville Resource Mgt Tract Palgrave Forest & Wildlife Area Goodwood Resource Mgt Tract Cold Creek C A Glen Major Resource Mgt Tract Albion Hills C A Glen Haffy Forest and Wildlife Area Bruce's Mill C A B-437 PROGRESS REPORT PAGE 5 Multi year forest management plans are being finalized with the remaining rural Authority properties to follow Wildlife inventories including breeding bird census have been completed for Glen Major, Bolton and Nashville Resource Management Tracts In addition wildlife habitat delineation is underway for these same properties This information will be utilized in the formation of wildlife management plans and will be incorporated in the resource management plans To assist the Black Creek Group, a community environmental group, a Wildlife inventory, habitat analysis and stream assessment was completed for the Black Creek from Finch Avenue to its Source With the assistance of the COED and Experience'83 programs, staff have inventoried the rivers and stream on Authority properties in the rural areas This information together with the forestry, wildlife and other existing data will be used to complete the overall resource management plans for Conservation Areas Forest and wildlife Areas and Resource Management Tracts An Authority land reforestation inventory has been prepared which summarizes all the p1antings on MTRCA property from 1957 to present A similar inventory of past erosion control and fisheries improvement projects has also been compiled Todate approximately 35 kelometers of work on streams has been completed Agricultural land rental reviews have been carried out on thirteen Authority lands todate in 1983 Approximately 47,525 reforestation trees were planted this spring for twenty landowners A total of 16,043 wildlife shrubs and 3753 trees were planted in the spring and fall under the Tree and Shrub, and Urban Wildlife programs An additional 20 containers stock cornifers were sold for wind break purposes Two Conservation plans have been completed this year and a further 2 are on file To date 35 Conservattion Plans have been completed for private landowners One reforestation subsidy has been approved for 19,000 trees Orders are on file for the spring of 1984 for 49,650 reforestation trees, 2200 trees and 1740 shrubs A questionaire was prepared and delivered to a select number of landowners in the headwaters of the Duffins Creek, a high priority .area for the application of private land conservation management programs Attitudes towards, and the existing state of reforestation, woodlot management, and ESA management were surveyed The survey will be expanded to other headwaters areas in 1984 Under Private Land Assistance Programs 145 site visit have been carried out to date providing advince on reforestation, tree and shrub planting, urban wildlilfe, wind breaks, wildlife habitat, erosion control, and ESA management In addition 7 pond site visits have been carried out Planting activities for private lands programs include continuing inventory of past assistance programs, a land use review of major watershed to priorize project locations and continuing argicultural land use review Staff have currently been working on programs for ESA management on Authority, private and public lands To assist in this project, both a priority and preservation list of ESAs have been prepared This priority list was based on research of existing information and communication with other staff and agencies and categorized ESAs on their need for management due to present ~nd potential impacts Presently, 43 ESAs have been field inventoried for impacts and a management strategy for each has been prepared indicating recommendations for the management of these ESAs These management strategies will be incorporated into resource management plans where required; will aid in identifying priority areas for the private landowner assistance programs; and will be utilized during discussions with public agencies B-438 PROGRESS REPORT PAGE 6 Promotion for Services Programs has included to date the circulation to cable T V. outlets a video tape of the Conservation Services slide presentation and news releases for various assistance programs A slide presentation on the Density Bonus Program will be completed in the near future Inventories have been completed for 90% of the primary and secondary watercourses within Metro Toronto and surrounding municipalities for the Authority's Urban Management program Three planting projects have been completed for the Rouge and Don Rivers and Highland Creek Two hundred and ninety-five trees and 1,300 wildlife shrubs have been planted In addition, approximately 200 meters of valley slope has been graded and hydro-seeded at the Etobicoke General Hospital along the Humber River. Plantings have also been carried out for the City of Brampton with 4,450 seedlings, 100 trees and 890 shrubs being established Six additional sites are scheduled for the fall under the COED program. Approval in principal has been reached with the City of Brampton for a joint project to be conducted in the spring of 1984 on public lands Landscape projects have been carried out at Humber Bay West, Aj ax Water fron t Area and Bluffer's East waterfront development projects. Tree maintenance projects have also been carried out Projects were also carried out as part of the Bolton channelization project and the South Thackeray Sanitary Landfill Site The following Landscape Projects will be commencing in the fall of 1983 (1) Indian Line Campground Entrance (2) Fishleigh Filtration Plant (3) Frenchman's Bay (4) Saddle House - Claireville C A. (5) Glen Major The Authority nursery program supplied trees and shrubs to various tree planting and landscape projects as well as to the Flood Co~ro1 Section, MNR, South Lake Simcoe, and Kawartha Lakes Conservtion Authorities and Save Our Streams Under the COED program, staff have assisted in accelerating the production of plant material used on job creation projects The nursery has produced the following salable stock for the fall 1983 and spring 1984 programs bare root shrubs 58,715 bare root trees 7,935 container stock 2,810 claiper trees 950 B-439 PROGRESS REPORT PAGE 7 FINANCIAL STATEMENT YR TO DATE ~ BUDGET EXPENDITURES EXPENDITURES BUDGET USED Administration 538,472 673 , 204 80 0 Watershed Recreation Planning 31,270 75,000 42 0 Conservation Area Development 22,779 181,960 12 5 Operations & Maintenance 1,723,444 2,149,000 80 2 Conservation Land Management Planning 89,020 118,500 75 1 Conservation Management 233,242 309,181 75 4 Fish Rearing 4,438 10,500 42 0 Operations - Non-Revenue 24,520 31,000 79 1 REC'D TO ~ BUDGET REVENUES 1982 BUDGET DATE REC'D Operations & Maintenance 1,016,000 906,912 89 3 Conservation Management 134,000 93,363 69 7 FINANCIAL COMMENTS PRO~AM ADMINISTRATION Spending levels indicate that this portion will be over budget by approximately $18,000 This is a result of a much greater increase in benifits than anticipated for premiums ($14,000) and budget reduction for gapping ($4,000) Reductions in spending in the Central Services, Conservation Services and Conservation Planning programs have been made to cover $14,000 of this projected deficit PLANNING & DEVELOPMENT The Boyd Master Planning Study is on schedule and within budget Work on the two major development projects is underway; however, expenses for these projects were not processed in time to show on the third quarter financial statement CONSERVATION AREA OPERATIONS Projected spending to year end indicated expenditures would be under budget The amount however will not be sufficient to offset the severe impact of lost revenues from the winter periOd The loss of swimming in key Areas prevented any chance of increased summer revenues to overcome the shortfall Area Superintendents have reduced their spending projections to reduce costs by approximately $46,000 CONSERVATION LAND MANAGEMENT Expenditures for all programs are in line for this time of year Reven ue estimates will be met following fall programs 1983 10 27 PBP/lp THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY DIVISIONAL EXPENDITURE SUMMARY FOR THE PERIOD SEPTEMBER 5, 1983 to OCTOBER 2, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ $ Finance & Admin.Cinc1. Land Acq.) 3,186,465 163,431 1,910,896 1,275,569 60.0 Water Resource - Flood Control 2,911,389 299,197 1,807,385 1,104,004 62 1 Water Resource - Waterfront 2,325,000 138,843 1,045,623 1,279,377 45.0 Conservation Land Management 3,548,345 225,415 2,667,380 880,965 75.2 Information & Education 2,426,623 1.67,273 1,580,913 845,710 65.1 Historical Sites 3,912,822 253,579 1,553,765 2,359,057 39.7 Vehicle & Equipment - Capital Acq. 280,730 77,821 198,626 82,104 70.8 SUB-TOTAL 18,591,374 1,325,559 10,764,588 7,826,786 57.9 Vehicle & Equipment - Operations -- 20,923 186,128 -- - Special Projects -- 57,753 566,871 -- - C.O.E.D. 1983/84 2,123,808 209,549" 901,055 1,222,753 42.4 Food Services 833,317 73,540 679,919 153,398 81.6 TOTAL 21,548,499 l,687,324 13,098,561 9,202,937 60.8 tIl () :I: ~===~==~===~==c==c~======c==============~c=======================~===== t'l 0 C ['" t'l lJl I "" 1983.10.17 () "" : 0 ~ B-441 , the metropolitan toronto and region conservation authority minutes REPORT #19/83 EXECUTIVE COMMITTEE 16-NOVEMBER-1983 #19/83 The Executive Committee met at the Authority Office, S Shoreham Drive, Downsview, on Wednesday, 16 November, 1983, commencing at 9 30 a m PRESENT FOR THE HEARING Chairman Mrs. F.E. Gell Members W.G. Barber M W H. Biggar Mrs L. Hancey H.C. Lawrie S A. Macpherson J S. Scott Following the roll call, the meeting adjourned to hold a hearing re Mr Lloyd Ginou City of North York Don River Watershed PRESENT FOR THE MEETING Chairman Mrs. F.E Gell Members W G. Barber M W H. Biggar E Ful ton- Mrs. L. Hancey H C. Lawrie S A. Macpherson Ms S Nimmo (For- Mrs N. Stoner) Mrs M. Prinsloo J S. Scott Authority Member A.L Smoke ABSENT Vice-Chairman E V. Kolb Member Mrs. N Stoner MINUTES Res #:305 Moved by: If.G Barber. Seconded by H ..c. Lawrie- THAT the Minutes of Meeting #l8/83 be- approved. CARRIED The Secretary-Treasurer introduced Mr. Jonathan Wigley of the legal. firm Gardiner, Roberts, who was present to answer' members' questions. in. connection wi.th. hearings under Ontario Regulation 170. SECTION I NO ITEMS i 8-442 -2- SECTION II FOR INFORMATION 1 DECISION OF HEARING Mr Lloyd Ginou City of North York Don River Watershed Res #306 Moved by S A Macpherson Seconded by J S Scott THAT the application of Mr Lloyd Ginou in accordance w~th Ontario Regulation 170, for permiss~on to place fill and construct a structure within the regulated area, as shown on Flood Line Map Sheet #13 of the Don River watershed, City of North York, be withdrawn without prejudice CARRIED 2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #307 Moved by Mrs L Hancey Seconded by J S Scott THAT the applications listed herein as A(l) to A(4) inclusive, be approved, subject to the conditions contained in the reports CARRIED A (1) The Regional Municipality of Durham To place fill at south-west corner of Frenchman Bay, south of Breezy Drive and Sunrise Avenue, Town of Pickering (Waterfront) In accordance with the following documents and plans, which shall form part of the permit A plan entitled "Proposed Access Route to Manholes", prepared by The Regional Municipality of Durham, dated August, 1983 Correspondence from Kees J Schipper of Durham Region to our office, dated October 18, 1983 A(2) Consumers' Gas Company To construct gas main across Rouge River at Kennedy Road, south of Highway #7, Unionville , Town of Markham In accordance with the following documents and plans, which shall form part of the permit Drawing #30-1659, Sheet 2 of 2, prepared by the Consumers' Gas Company, and dated October 26, 1983 A (3) H J Heinz Company of Canada Ltd To construct building addition north of Steeles Avenue, east of Dixie Road, City of Brampton (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit All work being done in accordance with Drawings A-I and BM-l, prepared by Quan, Carruthers, King, & Quan Consultants Ltd , and dated September 13, 1983 (4 ) Mr John Gardner To construct addition to dwelling at #91 Plymbridge Road, City of North York (Don River Watershed) In accordance with the following documents and plans, which shall form part of the permit Detailed Architectural Drawings as prepared by Algimantas 8anelis Architect -3- B-443 3. LAND ACQUISITION PROJECT 1982-1984: HUMBER RIVER WATERSHED -Property: Finery Investments Limited West of Indian Line, north of Darcel Avenue City of Mississauga Res. #308 Moved by: M.W.H. Biggar Seconded by: H.C. Lawrie THAT the report (OCtober 27, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED. Re: Project: Land Acquisition Project 1982-1984 - Flood Plain & Conservation Land Component: Humber River watershed Authority: Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property West of Indian Line, north of Darcel Avenue Owner: Finery Investments Limited Area to be acquired: 0.030 acres, more or less Recommended purchase price: Nominal consideration of $2.00 "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lots 40, 41, 42, 43, 44, and 45, Plan M-420, City of Mississauga (The Regional Municipality of Peel), located west of Indian Line, north of Darcel Avenue (Finch Avenue Extension), in the Claireville area. "Negotiations have been conducted with the owner, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable costs and disbursements are to be paid. The Authority is to receive con- veyance of the land free from encumbrance "The Administrator of the Water Resource Division has reviewed this proposed acquisition, and is in concurrence with my recommendation. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. 4. BRUCE'S MILL CONSERVATION AREA -Quotation Oil Furnace - Workshop f The following quotations were received for the supply and installation of a new, oil-fired, forced air furnace in the Bruce's Mill Conservation Area workshop Supplier Amount Commercial Burner Maintenance Ltd. (218,000 BTU unit) $2,750 00) Prices Fletcher Heating Ltd. (180,000 BTU unit) $2,975.00) include all taxes Res. #309 Moved by: H.C. Lawrie Seconded by: M.W.H. Biggar THAT the quotation of Commercial Burner Maintenance Ltd., for the supply and installation of a new, oil-fired, forced air furnace in the workshop at the Bruce's MiYl Conservation Area, in the amount of $2,750.00 (including all taxes), be accepted, it being the lowest quotation received CARRIED. B-444 -4- 5 QUOTATION #CLM83 40 -1983 Snow Plow The following quotations were received for the supply, delivery, and installat10n of one new 1983 7'6" commercial, heavy duty, snow plow Supplier Amount Marmac Hydraulics $1,995 00 + PST Dynaltco Hydrau11cs $2,017 00 + P S T Res #310 Moved by H C Lawrie Seconded by M W H Biggar THAT the quotation of Marmac Hydraulics, for the supply, delivery, and installation of one new 1983 7'6" commercial, heavy duty snow plow, in the sum of $1,995 00 (+ 7% Provincial Sales Tax) , be accepted it being the lowest quotation received CARRIED 6 LAKE ST GEORGE FIELD CENTRE -Quotation Garden Tractor The following quotations were received for the supply of one John Deere Model 318 garden tractor, with snow thrower, wheel we1ghts, chains, and cab Supplier Amount Snowball E'nterprises $6,568 00 Ken Maynard Services Ltd $6,663 00 Hutchinson Farm Supply Ltd $7,075 00 Clark Moore Motors $7,870 00 Provinc1al Sales Tax extra Res #311 Moved by Mrs L Hancey Seconded by S A Macpherson THAT the contract for the supply of one John Deere Model 318 garden tractor be awarded to Snowball Enterprises, in the amount of $6,568 DO, plus Provincial Sales Tax it be1ng the lowest quotation received CARRIED 7 PRELIMINARY PROVINCIAL POLICIES FOR CONSERVATION AUTHORITIES Res #312 Moved by Mrs L Hancey Seconded by Ms S Nimmo THAT the staff report on the Preliminary Polic1es for Conservation Authorities be received and forwarded to the Executive Director of the Association of Conservation Authorities of Ontario for consideration in the preparation of the ACAO response to the Minister of Natural Resources CARRIED 8 FINANCIAL REPORT AND ACCOUNTS FOR THE PERIOD OCTOBER 3-0CTOBER 3D, 1983 Res #313 Moved by J S Scott Seconded by M W H Biggar THAT the Divisional Expenditure Summary for the period October 3-0ctober 30, 1983, as appended as Schedule IlAII of these Minutes be received AND FURTHER THAT payment of the Authority accounts, 1n the amount of $1,515 729 00, be approved CARRIED -5- 8-445 9. EXPERIENCE '83 Res. #314 Moved by: Mrs. L. Hancey Seconded by: S.A. Macpherson THAT the staff communication, together with letter received from the Honourable Alan W. Pope, Minister of Natural Resources, under date of November 9, 1983, having regard to the Experience '83 Program, be received. CARRIED. 10. NEW BUSINESS Mr. Fulton stated that he would be pleased to contact the City Clerk of the City of Scarborough regarding arrangements to host the Annual Meeting of the Authority on Friday, February 17, 1984. 11. TERMINATION On motion, the meeting was terminated at 11 15 a.m., November 16, 1983. Florence E. Gell W.E. Jones Chairman Secretary-Treasurer KC. Ul w n I :c .to. trJ .to. Cl 0\ C L' trJ THE t1ETROPOLI'rAN TORONTO AND REGION CONSERVATION AUTHORITY :J>o DIVISIONAL EXPENDITURE SUMMARY = FOR THE PERIOD OCTOBER 3, 1983 to OCTOBER 30, 1983 Expenditures Current Year to Funds % Budget Month Date Available Spent $ $ $ $ Finance & Admin ( incl Land Acq ) 3,186,465 200,673 2,111,569 1,074,896 66.3 Water Resource - Flood Control 2,911,389 338,240 2,145,625 765,764 73 7 Water Resource - Waterfront 2,325,000 107,759 1,153,382 1,171,618 49 6 Conservation Land Management 3,548,345 234,502 2,901,882 646,463 81.8 Information & Education 2,426,623 146,653 1,727,566 699,057 71 2 Historical Sites 3,912,822 149,387 1,703,152 2,209,670 43 5 Vehicle & Equipment - Capital Acq. 280,730 9,721 208,347 72,383 74.2 SUB-TOTAL 18,591,374 1,186,935 11,951,523 6,639,851 64.3 Vehicle & Equipment - Operations -- 17,049 203,177 -- - Special Projects -- 68,924 635,795 -- - C.O E D 1983/84 2,123,808 174,402 1,075,457 1,048,351 50 6 Food Services 833,317 68,419 748,338 84,979 89 8 TOTAL 21,548,499 1,515,729 14,614,290 7,773,181 67.8 ----------------------------------------------------------------------- ----------------------------------------------------------------------- 1983 11.08 ~ B-447 , the metropolitan toronto and region conservation authority minutes REPORT ::20/83 EXECUTIVE COMMITTEE 30-NOVE~BER-1983 #20/83 The Executive Committee met at the Author~ty Office, S Shoreham Drive, Downsview, on liednesday, 30 November, 1983, commencing at 10 00 a m PRESENT Chairman Mrs F E Gell Vice-Chairman E V Kolb Members W G Barber M W H Biggar (For Ms S Nimmo) J A Bryson E Fulton Mrs L Hancey H C Lawrie S A Macpherson (For Mrs N Stoner) Mrs M Pr~nsloo J S Scott .;BSENT Members Ms S Nimmo Mrs N Stoner ~ MINUTES Res #315 Moved by S A Macpherson Seconded by W G Barber THAT the Minutes of Meet~ng #19/83 be approved CARRIED SECTION I NO ITEMS SECTION II FOR INFORMATION 1 CORRESPONDENCE ~r W A McLean, Acting General Manager, reported recei~t of the following correspondence Letter from Alderman Ed Fulton of the City of Scarborough, adv~s~ng of a press release ~ssued by the Honourable Paul Cosgrove concern~ng the land known as the Johns-Manv~lle property at the ;nouth of the Highland Creek in the City of Scarborough Res #316 Moved by Mrs M Prinsloo Seconded by Mrs L Hancey THAT the staff be directed to ~repare a report concern~ng the Johns-Manville site for presentation to the next regular meetinq of the Executive Committee, scheduled to be held on Wednesday, December 14, 1983 AND FURTHER THAT Mr John Mackie, Alderman, Ward 9 City of Scarborough, be advised that th~s matter 1S on the aqenda of said meeting CARRIED B-448 -2- At Meeting #18/83, a letter received from the Honourable Susan Fish was presented, approving a 1983 operating grant for the Black Creek P~oneer Village Visitor Centre, and request~ng acknowledgment of this support in all promotional or educat~onal material produced by the museum Resolution #291 directed staff to prepare a report concern~ng the proposed method of acknowledgment In this connection Mr McLean informed the Committee that the Administrator of the Historical S~tes Division has advised h~m that a statement can be included ~n certain of the Authority's brochures Res #317 Moved by M W H Biggar Seconded by S A Macpherson THAT acknowledgment of the 1983 operat~ng grant, provided by the Ministry of Citizenship and Culture for the Black Creek Pioneer Village Visitor Centre, be included in the appropriate promotional material of the Authority, AND FURTHER THAT the Min~stry be so informed CARRIED 2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #318 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the applications listed herein as A (1) and A (2) , be approved, subject to the conditions conta~ned in the reports CARRIED A (1) Campo Estates -&- Tam~ani Developments Ltd , To construct two storm sewer outfalls and a sanitary sewer crossing, north of Raymerville Dr~ve, Town of Markham (Rouge River Watershed) In accordance w~th the following documents and plans, which shall form part of the perm~t Project #81-ES-623, Drawings 53 and 60, dated October 1983, by Fred Schaeffer & Associates Ltd A(2) Woodbridge Square Joint Venture Project To undertake a storm water management project, vicinity of Woodbridge Avenue and Clarence Street, former Village of of Woodbridge, Town of Vaughan (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the perm~t (a) Drawing #3 Storm Water Retent~on, and Drawing #4 Cut and Fill Area Plan dated October 11, 1983 as prepared by Underwood McLellan Ltd (b) Storm Drainage Report entitled, "Woodbridge Square J V P Town of Vaughan" submitted by John Jaciw, P Eng 3 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED -Property Concorde Square Limited North of Wynford Heights Crescent, east of Don Valley Parkway, C~ty of North York Res #319 Moved by W G Barber Seconded by J A Bryson THAT the report (November 21, 1983 ) set forth herein, received from the Manager, Property & Adm~nistrative Serv~ces be adopted, and that the Secretary-Treasurer be authorized and d~rected to complete the purchase CARRIED -3- B-449 Re Project Land Acquis~tion ProJect 1982-1984 - Flood Pla~n & Conservation Land Component Don R~ver watershed Author~ty Sxecut~ve Resolution #88, Meet~nq ~4 - .:\'pril 8, 1981 and Author~ty Resolution ~38, t-leeting #3 - May 15, 1981 SubJect property North of Wynford Heights Crescent Owner Concorde Square Limited Area to be acquired 2.889 acres, more or less Recommended purchase price $2,500 00 per acre (i e $7,222 50) , plus vendor's legal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lots 2 and 3 Concession IV E Y S City of North York (The Municipality of Metropolitan Toronto), located east of the Don Valley Parkway, north of Wynford He~ghts Crescent "Negotiations have been conducted w~th the owner's solicitor, Mr Murray H Chusid 1000 F'inch Avenue West, Suite 700, Downsview, and, subject to the approval of your Committee, agreement has been reached with respect to a ~urchase price, as follows The purchase price ~s to be $2,500 00 per acre (~ e 57,222 50) plus vendor's legal costs, w~th date of completinq the transaction to be as soon as poss~ble "I recommend approval of this purcbase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing', for land transfer tax, legal costs and disbursements, are to be paid The Authority is to receive con- veyance of the land requ~red free from encumbr~nce "The Administrator of the Water Resource Division has reviewed this proposed acquis~tion, and is in concurrence with my recommendation ".I\n appl~cat~on has been made to the Ministry of Natural Resources for an Inspection Certif~cate " 4 PROJECT F'OR EROSION CONTROL & SLOPE STABILIZATION THE REGIONAL MUNICIPALITY OF' PEEL, 1982-1984 -Proposed Remedial Work Vicinity of Glasgow Road, Town of Caledon (Humber River Watershed) Res #320 Moved by W G Barber Seconded by J A Bryson THAT the proposed erosion control works at the rear of Albert Street in the Town of Caledon be deferred, THAT the funds allocated for the Albert Street project be made available for the Glasgow Road project, AND F'URTHER THAT eros~on control remedial works be carr~ed out in the v~cinity of Glasgow Road, Town of Caledon, at an estimated cost of 518,000 00 CARRIED 5 SALE OF' SURPLUS AUTHORITY ASSETS (HAVING A VALUE OF' MORE THAN 5500 00 ) In accordance with Author~ty policy for disposal of assets in excess of 5500 00 the staff has ident~f~ed equ~pment and mach~nery as surplus to its needs, consisting of five pick-up trucks and two tractors The following b~ds have been rece~ved for the trucks B-450 -4- VEHICLE HIGHLAND CHEV OLDS OTHER 1978 Dodge Custom 200, #0018 $1,875 00 $ 535 00 Dodge Custom 200, #NOOOll 1,850 00 856 00 Ford F250 Custom #KOO037 2,020 00 1,342 85 535 00 1977 Ford F250 Custom, #00017 2,020 00 1,926 00 1978 Dodge, #00020 1,875 00 1,979 50 856 00 535 00 Bids have not been received for the two tractors, but it is anticipated that their value will be in excess of $500 00 each Res #321 Moved by M W H Biggar Seconded by E V Kolb THAT the following equipment be declared surplus to Authority needs and that it be offered for sale to the highest bidder 1978 Dodge Custom 200 Pick-up Truck, #0018 Dodge Custom 200 " " #NOOOll Ford F250 Custom " " #KOO037 1977 Ford F250 Custom " " #00017 1978 Dodge " " #00020 1974 MF Diesel Tractor w/front end loader + 8' blade, 1 set of chains, Sims cab, Model FM40, Ser 9A182491, Equip #D-l-OOO 1974 MF135 Diesel Tractor w/roll over protection, Model MF135, Ser 57517J AND FURTHER THAT the bid received from Highland Chev Olds of Aurora be accepted for the sale of the 5 pick-up trucks, it being the highes~ quotation received CARRIED 6 KORTRIGHT CENTRE FOR CONSERVATION -Dining Room Licence Res #322 Moved by E Fulton Seconded by M W H Biggar THAT consideration of the matter of a Dining Lounge Licence for the Kortright Centre for Conservation be deferred, AND FURTHER THAT staff be directed to prepare a report for presentation to the Executive Committee having regard to anticipated operation with such licence CARRIED 7 QUOTATION #CLM83-44 -Indian Line Campground Residence/Laundromat The following quotations were received for the supply of laundry room equipment and kitchen counters/cupboards for the Indian Line Campground residence/laundromat For the supply and delivery of three c01n-operated washers and three coin- operated dryers Supplier Amount Same Day Serv1ce $3,300 00 Thor Industries $3,408 00 Inglis Laundry Equ1pment $3,720 00 -5- B-45l For the supply and dellvery of required counters/cupboard uni~s/vanities Supolier Amount Oakdale Ki~chens $1,962 00 Quallty Wocdworklng 53,200 00 ParlS Kltc!1ens $3,040 00 Nima Kitchens $5,380 00 Prices exclusive of Provinclal Sales Tax Res #323 ~1oved by H C Lawrie Seconded by M W H Biggar THAT the following quotations, for the supply of laundry room equipment and kitchen counters/cupboards for the Indian Line Campground residence/ laundromat, be accepted, being the lowest acceptable quotations received Supply and delivery of 3 (three) coin-operated washing machines and 3 (three) cOln-operated dryers Same Day Service - in the sum of $3,300 00, plus Provlncial Sales Tax, Supply and delivery of required cupboards, counters, and vanities Oakdale Kitchens - in the sum of $1,962 00., plus Provincial Sales Tax CARRIED 8 QUOTATION #CLM83-43 -Albion Hills Conservation Area Washroom/Shelter The following quotations were received for the supply of roofing materials and toilet partition doors for the Alblon Hills Conservation Area washroom/ shelter ~ For the supply and delivery of roofing materials 130 bundles 210# asphalt shingles, and 90 sheets of 3/4" T&G plywood sheathing Supplier Amount Unlted Lumber 53,264 80 Hanford Lumber $3,296 50 Card Lumber $3,363 50 Cadillac Lumber Incomplete "'or the supply, dellvery, and installatlon of toilet partition doors and requlred grab bars Suoolier Amount Columbia Doors & Hardware $l,270 00 Interior Coordinators $1,465 00 Flemming No reply Prices exclusive of Provincial Sales Tax Res #:324 Moved by H C Lawrie Seconded by M W H Biggar THAT the following quotatlons, for the supply of roofing materials and toilet partition doors for the Albion Hills Conservation Area washroom/shelter, be accepted, belng the lowest acceptable quotations received Supply and dell very of roofing materials United Lumber - in the sum of 53,264 80, plus Provincial Sales Tax, Supply, delivery, and lnstallatlon of tOllet partitlon doors and required grab bars Columbla Doors & Hardware - in the sum of 51,270 00, plus Provincial Sales Tax CARRIED B-452 -6- 9 THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Applications to the Canadian National Sportsmen's Fund Res #325 Moved by Mrs L Hancey Seconded by M W H Blggar THAT the submission of applications to The Metropolltan Toronto and Region Conservation Foundation for funding asslstance for the skating rink at Black Creek Pioneer Vlllage the establishment of a Kortright Centre for Conservation Growth Endowment Fund, the preparation of a five-year development plan for the Forestry Theme at the Kortright Centre the proposal for desiqn services and exhibit construction for the Forestry Theme at the Kortright Centre for Conservation, be approved CARRIED 10 ANNOUNCEMENTS 1 Mrs Hancey, Chalrman of the Personnel Sub-Committee, stated that a j meeting of that committee will be held on TUESDAY-DECEMBER-6-1983, COMMENCING AT 4 00 P M 2 Mrs Gel! informed the members that a reception will be held at the Kortright Centre for Conservation on Thursday, December 8 1983, from 7 00-10 00 P m to view an exhibition, "Designs in Nature Photography" and a premiere showlng of slides from the collection of the late Kenneth W Strasser 3 Mr Fulton advlsed that he had recently circulated a letter. to the members of the Waterfront Advisory Board advising that the Authority had been requested by Alderman Tony O'Donohue to proceed as soon as possible wlth the proposed hydraulic improvements to the mouth of the Humber Rlver Mr Fulton's letter stated, in part "Since the hydraulic improvement has been a component of the Authority's plans for a number of years, it appears appropriate for staff to proceed with final design preparatlon and construction as soon as possible ln the new year " l! TERMINATION On motlon, the meeting was terminated at l! 25 a m , November 30, 1983 Florence E Gel! W E Jones Chalrman Secretary-Treasurer KC ~ B-453 V the metropolitan toronto and region conservation authority minutes REPORT #:21/83 EXECUTIVE COMMITTEE 14 -DECEMBER-1983 #21/83 The Execut~ve Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on \iednesday, 14 December, 1983, commenc~ng at 9 30 a m PRESENT ChaJ.rman Mrs F E Gell Vice-Chairman E V Kolb Members W G Barber M Ii H Biggar E Fulton Mrs L Hancey H C Lawrie S A Macpherson \1s S Nimmo J S Scott Mrs N Stoner MINUTES Res #326 MO'led by Mrs L Hancey Seconded by S A Macpherson THAT the Minu~es of Meeting #20/83 be approved CARRIED SECTION I NO ITEMS SECTION II FOR INFORMATION 1 MANVILLE CANADA INC -Proposal to Rehabilitate Waste Disposal Site Alderman Jo~n Mackie, City of Scarborough, was present and spoke to this item Res #327 Moved by E Fulton Seconded by Mrs L Hancey THAT .staff be directed to prepare a brJ.ef, for submiss~on to the Environmental Assessment Board, outl~n~ng the Authority's concerns with the proposal by 'lanvJ.lle Canada Inc to rehabilJ.tate a portion of che~r exist~ng waste disposal s~te THAT appropriate Authority staff and legal counsel attend the Envlronmental Assessment Board hearing as part~clpants AND fURTHER THAT Alderman John Mackle, Ward 9, City of Scarborough, be invJ.ted to consult w~th Authority staff prior to completion of the report to the Environmen~al Assessment Board CARRIED B-454 -2- 2 ~ORTRIGHT CENTRE FOR :ONSERVATION -D_nino Room LJ.cence :<es :;:328 '.lo"ed b~ J S Scott Seconded by ~rs I Stoner T~A~ c~ns~deration of the [;latter of appllcation for a D~n~ng Room L~cence for the "ortr~ght Centre for Conservatlon be deferred co the next regular meet~ng of the Execut~ve Comm~tcee CARRIED 3 .;PPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #329 Moved by M W H Biggar Seconded by H C Lawr~e THAT the appl~cations l~sted here~n as A(1) to A (7 ) inclus~ve, be approved, subject to the cond~tions contained in the reports CARRIED .; (1) Markland Wood Country Club To undertake streambank eros~on control works on sect~on of the Etob~coke Creek, north of Dundas Street, City of Etob~coke In accordance w~th the follow~ng documents and plans which shall form par c of the permit A s~te plan and cross sect~on prepared by Markland Wood Country Club and submitted w~th the applicat~on .; (2 ) 'hi(~tas Tzembelicos To undertake constructlon of culvert for extension of Rebecca Court across tributary of the Don Ri ',er , Town of Vaughan In accordance with the following documents and pI ans , which shall form "art of the "erm~t Draw~ngs Nos 2 and 7, ProJect 202E-79, prepared by Anton Kikas Limited A(3) Von-Land Corporat~on Lim~ted To construct storm water management fac~l~ty for storm sewer system w~th~n proposed industrial development, Lot 8, Concess~on III. Town of Vaughan (Don River Watershed) In accordance with the follow~ng documents and plans, which shall for:n part of the permit The following drawings, as prepared by Ander Engineering & Associates Ltd 82-117-1, Sheet 1 of 2, General Plan, 82-117-2, Sheet 1 of 2, Grading Plan 82-117-8 Sheet I, Spec~al Details 82-117-8, Sheet 2 Special Details ; (4 ) C~ty of York - Parks & Recreat~on Department To construct pedestrian br~dge across the Black Creek at Trethewev Park (Humber River Watershed) In accordance with the follow~ng documents and plans, wh~ch shall form part of the permit C~ty of York - Parks & Recreation ;)epartment, Drawing "os 91 and B2, dated July 1983 -3- B-455 ;d 5) City of Scarborough To cons~r~c~ retaining wall adJacent to creek ea'st of "Iarkham Road, sou~h c: Pr::aress Court lH1gr.land Creek ..later shed ) In ac::or::lance w1ch c'1e foll::w1~g documents and plans ,....hich shall form ;:art of the perm1: (a) Location plan and sectlon of retaln1ng wall, prepared by the appl1cant (b) Approximate slltation control, as dlscussed with Mr J Tucker of this office A(6) Mr James Healey To construct garage, vicini ty Mill and King Streets, Village of Bolton, Town of Caledon (Humber River Watershed) In accordance with the following documents and plans, which shall form part of the permit (a) Drawing as prepared by James Healey, and dated November 30, 1983 (b) Pad elevation will be 215 8, as revised, in red, on the plan .~ ( 7) Vincent & Gino Cavalieri To construct 4-storey apartment bUlldlng, south of Klng Street, east of Queen Street, Village of Bolton, Town of Caledon (Humber Rlver Watershed) In accordance with the following documents and plans, which shall form part of the permit Al 2 3, and 4, ProJect #10-053, prepared by V W Kuchar & Associates, and dated August, 1983 4 INTERNATIONAL JOINT COMMISSION BIENNIAL CONFERENCE, NOVEMBER 15 -1 7 1983 -Reeort Res ;1:330 Moved by Mrs N Stoner Seconded by E V Kolb THAT the report on the International Joint Commission Biennial Conference - 15-17 November 1983, together with letter of December 5 1983, directed to Alderman Tony O'Donohue, P Eng , Chairman of the Metropolitan Toronto Water Pollution Committee, by W A McLean, Actlng General Manager, be received c.a.RRIED 5 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED -Property The Municlpality of Metropolitan Toronto East side Kieling Avenue, north of Steeles Avenue Res #331 Moved by E V Kolb Seconded by Mrs N Stoner THAT the report (December 6, 1983 ) set forth herein, recelved from the Manager Property & Administrative SerVlces be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase C.I),RRIED 8-456 -4- Re Project Land Acquis~~ion ProJect 1982-1984 - E"lood Plain & Conservat~on Land Component Humber Ri ver 'tla ter shed .:"ut'1or:. ~y Executive Resolution #88 'teeting #:4 - .:.. :::>r i 1 3 1981 and Authority Resolu~lon ;;:38, ~ee ting ~3 - 'lay 15 1981 Subject pro~erty East 511e i<i;::ling Avenue north of Steeles Avenue Owner The Municipal~ty of Metropolitan Toronto Area to be acquired 8 250 acres more or less Recommended purchase price Nom~nal consideration of $2 00 "Included ~n the requ~rements for the above-noted project is an irregularly- shaped parcel of land, be~ng Part of Lot 40 Concess~on I A I, E" T H , City of Etobicoke, and Part of the Road Allowance between the City of Etobicoke and the Town of Vaughan (The Municipal~ty of Metropolitan Toronto), located in the north-east quadrant of Steeles and Kipling Avenues "Negotiations have been conducted with officials of The Municipali ty of Metropolitan Toronto and subject to the approval of your Committee, agreemen t has been reached with respect to a purchase price, as follows The purchase price is to be the nom~nal cons~deration of $2 00, w1th date of complet~ng the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal f~rm of Gardiner Roberts be ~nstructed to complete the purchase All reasonable expenses ~ncurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be ~a~d The Authority is to rece~ve con- 'leyance 0; the land required free from encumbrance, w~th the exception of exist~ng 5er~ice easements Il~he follow~ng clauses are to be included ~n the deed from The "1unicipality of Metropolltan Toronto to The Metropolltan Toronto and Region Conservation Authority 'And the said Grantor convenants and agrees to indemnlfy and hold harmless the Grantee from all losses, costs, and expenses it may suffer or incur 1n connectlon with any or all injuries, including death and damages suffered or incurred as a consequence of or in any way connected with gas ~n on, or upon the lands descr~bed hereln or any emlssion, release discharge, dispersal, or escape of such gas from the lands descrlbed herein And the Grantor covenants with the Grantee that the Grantor will cover the lands descrlbed herein w~th a suitable turf cover satlsfactory to the Grantor and the Grantee w~th~n one (1) year of the date hereof , "The Administrator of the Water Resource Division has reviewed thi.s proposed acqulsit~on and is in concurrence wlth my recommendation IlAn application has been made to the Ministry of Natural Resources for an Inspectlon Certificate " 6 WATERFRONT PROJECT 1982-1986 -Survev Equipment Res ~332 Moved by Mrs L Hancey Seconded by H C Lawrie THAT the quotation of Thos Pocklington Llmited, for the supply of one Sokkisha TM20C Theodolite RED2-EDM, and supportlng equlpment - as detailed in the quotat~on, at a total cost of $7,200 00, be accepted C.!\RRIED -5- B-457 7 KORTRIGHT CENTRE FOR CONSERVATION -Woodland ?av~lion Res #333 Moved by :-lrs L Hancey Seconded by H C Lawrie ~HAT the sta=r be authorized and directed co proceed '.vi th the Noodland ?a'i~lJ.on at t'1e Kortrignt Centre =or Conservat~on as part of che Canada-Ontario Employment Development (e 0 2 D ) proJect T!'L, ':' f'-lnds ~n ,:he amount or $9,600 00 allocated to Albion H~lls Development be transferred ~o the Kortr~ght Centre for Conservation as .support Costs AND FURTHER THAT the amount of $38,400 00 be allocated from levy money on hand to the Kortright Centre for Conservation as part of the Authority contribut~on to the C 0 E D proJect CARRIED 8 ALBION HILLS CONSERVATION FIELD CENTRE -Coat/Mud Area Addition-83 The follow~ng tenders were received for the Coat/Mud Area Addition-83 at the Albion Hills Conservation Field Centre Vern Leonard Co Lcd $41 232 00 Cra~ghurst Ltd $42,487 00 Fa~rw~n Construction Co Ltd $46 800 00 Schomberg Construction Ltd $47 300 00 Perw~n Construction Co Ltd $54 700 00 Lisgar Construction Co $58 000 00 ~es #334 '1oved by Mrs L Hancey Seconded I::~ E V Kolb 'I'HAT sub,ect to the written approval of the funding by the Etobicoke Board of Educa t~on , the contract for the construct~on of the Coad/Mud Area Addition to the Albion H~lls Conservat~on F~eld Centre be awarded to the Vern Leonard Co Ltd at ~ts tendered pr~ce of $41,232 00, ~t be~ng the lowest tender received CARRIED 9 QUOTATION #83-8(I&E) -Authoritv General Brochure . The follow~ng quotat~ons were rece~ved for the print~ng and supply of 100 000 copies of the Authority's promot~onal brochure Suppl~er Amount Haughton Graphics Limi ted $10 725 46 Globe Pr~nting & L~thographing (Toronto) L~mi ted) 10,846 59 Johnstone/Adams Graphics Ltd 10,875 75 ~cLaren Morris & Todd Ltd 11 044 80 Consumer Graphics Inc 11,164 99 Panographics Limited 11,503 22 Norgraph~cs (Canada) Limited 11,896 26 F~ne Print 12,22~ 82 General Printers 12,357 00 Charters Litho Inc 12,655 00 Surrey Offset Printers Limited 12,701 01 Welch & Quest Limited 12,906 00 JHF Productions Canada L~m~ ted 13,097 54 Eddygraph Commun~cat~ons Ltd 13,354 00 Double-D Graphics 13 ,410 12 Tibbles Pr~nting Company Limited 13 412 45 Baker Gurney & McLaren Press Ltd 13 615 38 Alexander Lithographers Ltd 13 ,680 00 Arthurs-Jones L~thograph~ng Ltd 13 ,750 00 Blackshaw & Associates L~m~ted 14,240 52 Howell Printing Company Limited 14,656 89 The National Press 14,900 00 Bruce R Potter Agenc~es Ltd 15,464 38 Photra L~m~ted 16,270 00 B-458 -6- Res #335 Moved by S A Macpherson Seconded by M W H B~ggar THAT the quota ion of Haughton Graph~cs L~m~ted for the print~ng and supply of ll)O 000 cop es of the Author~ty's promotional brochure, ~n the quoted a::lo"::l":: of $10 25 46 ~nclud~ng Federal and P::"ov~nc~al taxes be accepted CARRIED lO PERSONNEL SUB-COMMITTEE -"eport #:3/83 Res #336 Moved by Mrs L Hancey Seconded by Mrs N Stoner THAT Report #3/83 of the Personnel Sub-Committee, as appended as Schedule "All of these M~nu1:es, be received AND FURTHER THAT the recommendat~ons, as contained therein, be approved CARRIED 11 REQUESTS TO THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION FOR FUNDING ASSISTANCE IN 1984 Res #337 Moved by J S Scott Seconded by Mrs N Stoner THAT the Metropolitan Toronto and Reg~on Conservation Foundat~on be requested to g~ve considerat~on to ra~s~ng funds in 1984 for the following projects 1 Kortr~ght Centre for Conservation (a) Foyer and Exhibit Floor Layout $10,000 00 (b) \'later Theme $15 000 00 (c) Fish and W~ldl~fe S15,000 00 (d) Wood Arts Centre S12 000 00 2 Black Creek Pioneer V~llage (a) Nesb~tt Sawm~ll S40,OOO 00 (b) R~chmond Hill Manse and Sawyer's House S20,OOO 00 3 Bruce's Mill Conservat~on Area Mill Restorat~on $35,000 00 CARRIED 12 OPERATION OF THE GUILD INN AND LEASE TO METROPOLITAN TORONTO Res #338 Moved by Mrs L Hancey Seconded by H C Lawrie THAT authority be granted to enter into a lease, for a nominal sum, for the period January 1, 1984 to December 31 1985, with The Munic~pality of Metropolitan Toronto of approximately 26 5 acres of land, as well as the bu~ldings and chattels ass9ciated with the Guild Inn which are presently the subject of a lease with Gu~ldwood Hall, to provide for the operation of the Guild Inn through the Board of Management for such period THAT the lease contain such terms and cond~tions as are deemed appropriate by the Metropolitan Solic~tor the Metropol~tan Commiss~oner of Parks and Property, the Author~ty's sol~c~tor, and Author~ty staff AND FURTHER THAT the appropr~ate Author~ty offic~als be author~zed and d~rected to take the necessary act~on to g~ve effect thereto CARRIED -7- B-459 13 QUO~ATION #CL~83-45 -Sale of Surolus Equ~oment The following q~otations were received for the purchase of t1.vO tractors ~dentified as surplus to Author~ty needs 1974 'lF30 D~esel Tractor 1975 ~l F 13 5 ''';~ th E'ront End Loader D~esel Tractor Don Ward 54,700 00 - Edwa.rds Equipment $4,000 00 52,750 00 Don Vallance Equ~pment $4,000 00 52,235 00 Nobleton Farm Service 53,000 00 52,200 00 Brian Harrison 52,600 00 Sl,600 00 ties tmetro Ford - - Res #339 Moved by H C Lawrie Seconded by E V Kolb THAT the bid received from Don Ward for the sale of one 1974 MF30 Diesel Tractor w~th Front End Loader and 8' blade, one set of chains, and Sims cab, in the sum of S4,700 00, be accepted ~t being the highest bid received AND FURTHER THAT the bid received from Edwards Equipment for the sale of one 1975 MF135 Diesel Tractor complete with roll-over protection, in the sum of $2,750 00 be accepted it being the highest b~d rece~ved CARRIED. 14 ACCOUNTS FOR THE PERIOD OCTOBER-31 TO DECEMBER 4, 1983 Res #340 Moved by H C Lawrie Seconded by E V Kolb THAT accounts aggregat~ng S2 083 353 00, for the period October 31, 1983 to December 4, 1983, be approved for payment CARRIED 15 QUOTATION #CLM83-46 -Indian Line Control Bu~lding/Supervisor's Res~dence The follow~ng quotations were received for the supply of furnishings for the Indian Line Campground Supervisor's res~dence Supply and delivery of one 30" stove and one 15 cu ft refr~gerator Eaton's S 958 00 Galloways 1,178 00 Woolco 1,298 00 Supply and delivery of chesterfield upholstered chair, bed-chesterfield, din~ng room set, and coffee table Eaton's $4 359 00 Simpson's 4,645 00 Ikea N/A Supply and del~very of bedroom furn~ture for Superv~sor's residence Simpson's Sl,997 00 Eaton's 2-,240 00 Ikea N/A Supply and del~very of kitchen table and cha~rs bookcase chest-of-drawers and coffee table for the Ass~stant Supervisor's residence Ikea Sl,051 00 Simpson's 1 178 00 Eaton's N/A All of the above prices exclusive of P~ovinc~al Sales Tax 6-460 -8- Res #341 'loved by H C Lawrie Seconded by E V Kolb THA~ the following ~uotat~ons for appl~ances and furniture required for the I~d~an L~'e :ampground Supervisor'5 and A5sistant Superv~sor's res~dences ce accepted, c~ey be~ng the lowest quo:at~cns rece~ved E3tOn s - fer the supply of a 30" manual-clean stove and 15 cu ft =~ost-free refr~gerator, ~n the sum of S958 00 plus ?rovinc~al Sales ~ax and for the supply of one chesterfield one bed-chesterf~eld one upholstered cha~=, d~n~ng room set and coffee table in the sum of S4,359 00, plus Prov~nc~al Sales Tax S~mpson's - for the supply of bedroom furniture for the Superv~sor's res~dence (only) ~n the sum of Sl,997 00, plus Provincial Sales Tax, Ikea - for the supply of kitchen table and chairs, bookcase/chest-of- drawers, coffee table for the Assistant Supervisor's residence, in the sum of $1,051 00, plus Provincial Sales Tax CARRIED 16 QUOTATION #CLM83~47 -Albion Hills Washroom/Shelter The following quotations were rece~ved for the supply and delivery of materials required for the Albion Hills Washroom/Shelter complex Supply and dell very of approx~mately 1,200 sq ft of Un~cobble (colourmix brown) ?erma Pav~ng Stone Sl 194 12 Int~rlock~ng Pav~ng 1 566 48 . Un~lock Ltd 1,733 40 includ~ng Prov~ncial Sales Tax Supply and del~very of approx~mately 700 sq ft of floor tile base trim, and grout material Sole Tile Sl,700 00 Moscone Tlle 1,903 00 Olympia Tlle 2 064 00 Prov~ncial Sales Tax extra Res #342 Moved by H C Lawrie Seconded by E V Kolb THAT the quctat~on of Perma Paving Stone for the supply and delivery of approximately 1 200 square feet of Unicobble floorlng surface for the Albion Hills Picnic Shelter in the sum of Sl 194 12, including Provinclal Sales Tax, be accepted, ~t being the lowest quotation recelved AND FURTHER THAT the quotatlon of Sole Tile, for the supply and delivery of approximately 700 square feet of floor tile and trim for the Albion Hills washroom, in the sum of Sl 700 00, plus Provinclal Sales Tax, be accepted ~t belng the lowest quotation rece~ved CARRIED 17 QUOTATION #CLM83-48 -Cold Creek Conservatlon Area Entrance Sign The followlng quotat~ons were rece~ved for the supply and delivery of 12" plywood lettering, with plast~c face, requ~red for the above-noted slgn Harrison Bros Sl,l17 32 (+ PST) Sunny Plast~cs N/A Signs and Service N/A -9- B-46l Res '*343 Moved by H C Lawrle Seconded by E V Kolb TH;~ ~he quoca~_on :Jf :-!ar~~son 3ros for 12" plywood letterlng f:)r the ;::old Creek Conae.c atlon Area entr3nce s~gn in the sum of Sl ll~ 32, plus ?r:;'J~'c~al Sa_es !a,< ~Q ac(;:e,ned It be~ng the or.l~ quotati:>n rece~\ed CA~RIED 18 ANNOUNCEMENTS 1 The Chairman ~nformed the members, with deep regret, of the death of Mr Spencer Ii Caldwell by automobile accident on Saturday December 10th A memor~al service, at which the Authority will be represented, is to be held on a date not yet announced 2 The Act.lng General ~anager expressed apprec~ation on behalf of all of the 5taff for the support and co-operation received from the Executive Comm~ttee and the full Author~ty dur~ng 1983 19 TER~I'lATION On motion the meet~ng Has terminated at 11 25 a m November 30, 1983 Florence E Gell W E Jones Chalrman Secretary-Treasurer KC B-462 SCHEDULE IIA-II TO The Chairman and Members Execut~ve Comm~ttee M T R C A , #21/83 FRG:-l ~Ir s LOls Hancey, Chalrman, Personnel Sub-Committee ~E REPORT =3/83 PERSO~~EL SUB-COMMITTEE TP.E SUB-COMMITTEE RECOM~IENDS THAT 1 (a) The 1984 class level ranges of salary/wages (Appendix 1 hereto) be approved, (b) The 1984 hourly wage rates for supplementary staff (Appendix 2 hereto) be approved (c) The dental plan be up-graded from the 1980 dental fee schedule to the 1983 fee schedule, subject to the regulations of the Public Sector Waqe and Prlce Restraint Act 2 The up-dated Authority Clothing Policy (Appendix 3 hereto) be approved 3 Personnel Pol~c~es B-1 "Group Insurance Plans, and B-2 "Short Term Disablli ty" be amended t~ permit coverage for major medical, dental and short term d~sab~lity for probat~onary employees (Appendix 4 hereto) ~ 4 The following 1983 appoint:ments and reclassificat~ons within the full- time and full-tlme probationary stafE be approved Reclass~ficat~ons w~th~n the Full-Time Staff J Berry Superintendent Ii R SMl March 1 R Marinzel Asst Superintendent W R GF3 February 1 J Hon~ngh Asst Superintendent C L M GF3 January 1 R Wa~nwr~ght Lead Hand C L M GF2 February 27 J Clarke Admin~strative Asst , F & A G04 October 3 Pr~nt & Ma~l Room Acpo~ntments to Full-Time Staff T Maclean Admlnistratlve Clerk I & E G02 July 1 M Jur~ma Foreman H S GF3 July 1 S Robinson Artisan H S GF3 January 1 S Chang Accounting Clerk F & A G02 March 1 -Payables R Hill Supervisor, F & A SMl January 1 Accounting Servlces B Rundle Accounting Assistant F & .1\ G03 January 1 K MacDonald Personnel Officer S S TP4 September 1 Appointments to Probationary Staff L D Field Manager, Planning & W R SM4A December 19 Env~ronment M Fenn~ng Property Ass~stant F 6. A G03 November 21 7-December-1983 KC B-463 APPENDIX 1 ( 1 ) THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SCHEDULE B contd. Executive Mtg. Resolution No. SALARIES/NAGES Date. 1984 CLASS LEVEL RANGES Hourlv Rate Class Mid Job Mld Job Level Entrv Point Rate Entrv Point Rate G01 14,601 15,412 16,224 G02 15,915 16,799 17,683 G03 18,908 19,958 , 21,009 G04 20,610 21,755 22,901 G05 22,466 23,713 24,962 GF1 18,908 19,958 21,009 9.06 9.56 10.07 GF2 20,610 21;755 22,901 9.88 10.42 10.97 GF3 22,466 23,713 .. 24,962 10. 77 11.37 11.96 GF4 26,692 ~8,175 29,657 12.79 13.50 14.21 I I I ~~~ 17,348 I /18,311 19,275 21,767 23,127 24,488 25,848 27,209 TP3 25,862 27,477 29,093 30,710 32,326 TP4 30,725 32,647 34,566 36,486 38,407 SM1 23,726 25,208 26,692 128,175 29,657 SM2 28,187 29,949 31,711 33,473 35,235 SM3 30,725 32,647 34,566 36,486 38,407 SM4A 33,491 35,583 37,677 39,770 41,864 SM4B 36,504 38,790 41,067 43,349 45,630 SM5A 38,489 40,775 43,051 45,334 47,614 SM5B 39,790 42,276 44,764 47,250 49,737 SM5C 43,371 46,082 48,794 51,504 54,215 SM5D 47,274 50,229 53,184 56,138 59,093 SM5E 51,529 54,750 57,971 61,191 64,411 - 50 - B-464 APPENDIX 2 ( 2 THE METROPOLITAN TORONTO ~ND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SCHEDULE 9 contd. Executive Mtg. Resolution No. SALARI ES/fN'AGES Date. 1984 Wage Rates - Suop1ementary Service Staff Students (under 18) Jan.1/84 $2.65 - 3.00/hr. *Mar.l/84 3.00 - 3.3S/hr. *Oct.l/84 3.15 - 3.S0/hr. Students (over 18) Jan.1/84 3.50-4.00-4.50-S.00-5.50/hr. *Mar.l/84 3.85-4.00-4.50-5.00-5.50/hr. *Oct.l/84 4.00-4.50-S.00-5.50/hr. * reflects increase to minimum wage legislation. Student rates are applicable to those supplementary employees who are currently students, or who have been students within the four month period preceding the date of hire. These rates do not apply to recent post-secondary graduants. Rates apply to students performing general service duties such as gate/building attendants, shop sales/rentals, or unskilled labour. General Service (non-student) (gate/building attendants, cleaners, unskilled labour) $4.00-4.50-S.00-S.50-5.75/hr. Labourer (machinery experienced) $7.70 Lead Hand (seasonal) $8 .25 Senior Clerk $7 . 70 - 8.25 Gift shop sales (seasonal) $6.15-6.95-7.70 Gift shop sales (part-time) $5.10-5.60-6.15 1984 Wage Rates - Supplementary Program Staff Recreation Programs Campground Supervisor (Albion) $76-80.00/diem Campground Supervisor (Claireville) $80-84.00/diem Recreation Program Coordinator $59-64.00/diem Assistant Recreation Program Coordinator $6.85-7.15/hr. - 51 - B-465 (3 ) THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SCHEDULE B contd. Executive Mtg. Resolution No. SALARIES/WAGES Date: 1984 Wage Rates - Supplementary Program Staff contd. Recreation Proarams contd. ~ Recreation Program Instructor $6.SS-6.BO/hr. Lead Hand, Recreation (GF 2 ) $9.88-10.42 10.97/hr. Water Safety Coordinator $S9-64.00/diem Head Lifeguard, Range Officer $5.65-5.95/hr. Assistant Lifeguard $4.B5-5.25/hr. Lifeguard, ~atroller $4.40-4.70/hr. Education Programs Education Program Coordinator $61-67.00/diem I Education Assistants (Level I) $25-27-29.00/diem Education Assistants (Levels II - IV) $40-45-51-58.00/diem Guest Lecturers $60. to $200./diem Interpreter/Artisan Programs Administrative Assistant, Interpreters $9.88-l0.42-10.97/hr. Interpreter/Artisan (seasonal) l. $9.88-10.42-l0.97/hr. 2. $10.77-1l.37-1l.96/hr. Artisan (part-time) $6.55 Interpreter (seasonal) $6.85-7.l5-8.l0-8.65/hr. Interpreter (part-time) $5.50 Technical Positions Technical (undergraduate) $5.65-5.95-6.30/hr. Technical (graduate) (TP) * $9.S0-l0.0S-10.S5/hr. * where greater skills are required, other TP levels may be used. - 52 - 8-466 (4 ; THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL ~ANUAL SCHEDULE B contd. Executive M~g. Resolution No. SALARIES/NAGES Date: 1984 Wage Rates - Supplementary Food Service Staff * note changes to minimum wage legislation: (under 18) Mar. 1/84 $3.00/hr. Oct. 1/84 3.15 (over 18) Mar. 1/84 3.85 Oct. 1/84 4.00 Under 18 Over 18 Bus Person Level I *$2.65-3.00/hr. *$3.50-3.90-4.20/hr. Cleaners Level II *$2.65-3.00 /hr. *S3.50-4.l0-4.45/hr. Counter Server Level I *$2.65-3.00/hr. *$3.50 (lead hand 4. 20 ) Naiter/Waitress Level II *$3.50 + tips (leadhand 4.20) Cashier, Snack Bar Level I $3.90-4.45-4.70 Cashier, Full Service Level II $3.90-4.70-4.95/hr. Bartender $4.20-4.95-5.75/hr. Assistant Cook *$2.65-3.00/hr. *$3.50-4.70-5.25/hr. 2nd Cook Level I $5.50-7.35/hr. 1st Cook Level II $7.35-l0.50/hr. Unit Assistant Level I $4.50-S.75-6.80/hr. Unit Assistant Level II $6.80-7.35-7.90/hr. Unit Assistant Level III $365.-385.-405./wk. Area Assistant S365.-385.-405./wk. - 53 - APPENDIX 3- B-467 CLOTHING POLICY ( 5 ) In :ecognition of the public service nature of the work of the Authority, and in order that Authority staff are easily identifiable by the public, Authority uniforms or special costumes must be worn by designated staff while carrying out their normal work duties~ Division ~dmini3trators are responsible for establishing the type of unifor~ or costume to be worn by members of their staff. Uniforms or costumes can be obtained from the Authority on either a free issue or half price issue basis as detailed below. Employees are responsible for the care and upkeep of uniforms or costumes. Except for travelling to and from work, clothing which displays Authority identification is not to be worn during off duty hours. FREE ISSUE Dress Uniform: , , . Consists of - 1 blazer, dark brown with circular crest on left pocket. 2 pairs beige pants or 2 beige skirts 3 shirts or blouses with shoulder flashes and position ensignia . I 2 ties, dark brown For the purpose of th is policy, the above uniform is available to the following categories of Regular Staff if deemed appropriate by the Division Administrator. Supervisor, Conservation Education (KCC , FC) Manager of operations, ( BCPV) Supervisors, in SM2 Classification Superintendents, in SMl Classification (except Superintendent Enforcemen t) Curator, (KCCl Safety Officer Assistant Superintendents, Conservation Areas Casual Oniform: Consists of - z~ppered tunic, dark brown with shoulder flashes and position ensigna 2 pairs dark brown pants (above items wash and wear) 3 shirts or blouses with shoulder flashes and position ensignia 2 ties, dark brown 8-468 Clothing policy page -2 (6 For the purpose of this policy, the above uniform is available to the following categories of Regular Staff if deemed appropriate by the Division Administrator. Supervisor, Conservation Education (KCC, FC) Manager of Operations (3CPV) Superintendents, in SM Classification (except Superintendent Enforcernen t) Curator n(CC) Safety Officer Technician, Resource Management Forex.nan, Resource Management Foreman (BCPV) Dam Operator Building Superintendent, I & II Assistant Superintendents, in GF3 Classification Lead Hand Enforcement Uniform: Winter - 1 tunic, dark brown (long - dress) 1 tunic, dark brown (short - casual) 2 pair beige pants 3 shirts, ~ong sleeves with shoulder flashes and position ensignia Summer - 1 tunic, dark brown (short) 2 pair pants, dark brown . ~ 3 shirts, short sleeve with shoulder flashes and position ensignia (above items wash and wear) ( NOTE: Shirts and tunics complete with epaulets, crown buttons~ sam brown and regular belt loops on pants) . In addition to above, the following accessories are also provided: - 2 ties - dark brown - sam brown belt - epaulet covers - 1 dark brown peaked hat (summer) and 1 fur hat (w in t e r ) - Footwear, 1 pair/year of either boots or shoes, CSA green patch standard. This uniform is provided to Enforcement Staff. - In addition to all uniform styles identified, those staff noted are also entitled to a nylon parka; and for those positions which by nature of duty require considerable outside 'o'Iork in periods of inclement weather, 1 rain coat. Clothing policy 8-469 pag e -3 ( 7 ) Special Clothing Certain Authority operating locations (e.g. Black Creek Pioneer Village) and jobs (e.g. Li feguard s) require special articles of clothi'g to properly identify staff. Division Administrators dete=mine locations and jobs requiring such items, decide the type of clothing to be worn and set wearing standards. special clothing is nFree Issuen to employees, who are :esponsible for the care and are required to return all items issued, clean and in good repair, at the termination of employment. In addition to costumes, the Authority provides employees with safety protection articles, except footwear, on a npree Issuen basis. Employees must wear the necessary safety clothing required to perform the job in compliance with the Occupational Health and Safety Act. Safety items (excep~ hard hats) remain the property of the Authority and must be returned, clean and in good repa~r, at the termination of employment. Employees who fail to return items or who return damaged or uncleaned items, may be assessed cost incurred by the Authority. HALF PRICE ISSUE <\0 Work Uniform: Consist of - dark brown pants and zippered windbreaker and beige shirt or blouse complete with shoulder flashes. May also include position ensignia. Also available as part of work clothing, are dark brown coveralls, work parka, T-shirts and hats (summer and winter) . These items are available to: REGULAR STAFF - General Pield and Technical Professional categories, whose job requires a large percentage of time in the field and in contact with the general public. Quantities are available as follows: - 3 pair work pants - 3 work shirts/blouse - 2 windbreakers - 2 coveralls - 1 winter parka - 1 winter cap - 2 summer caps - 3 T-shirts - 1470 Clothing policy pag e -4 ( 8 REGULAR STAFF - Technical Professional and Supervisory Management categories, whose job requires occasional field work and contact with the general public. Quantities are available as follows: - 1 pair work pants - 1 shirt or blouse - 1 'tJindbrea:<er - 1 pair coveralls - 1 T-shirt - 1 summer cap - 1 winter cap - 1 nylon or work parka SUPPLEMENTARY STAFF, whose job requires a large percentage of time in the field and contact with the general public. Quantities are available as follows. Winter wear only available when staff employed regularly through winter period. , - 2 work pants - 3 shirts or blouses - 1 'Ilindbreaker - 1 patr coveralls - 3 T-shirts - 2 summer caps - 1 work parka - 1 winter cap SU?PL~~NTARY STAFF, hired under special programs or whose work is of a short duration. Quantities are available as follows. Winter wear only available when staff emplopyed regularly through winter period. - 2 pair work pants - 2 shirts or blouses - 1 windbreaker - 2 T-shirts - 1 summer cap - 1 winter cap - 1 work parka Safety Footwear Regular Staff Categories whose job requires footwear to be worn which meet safety legislation requirements will be provided with a contribution of 50% of the cost, to a maximum of $3D.OO per pair. Initial issue will consist of 1 pair of summer and 1 pair of winter safety footwear meeting the CSA green patch standard. This standard requires footwear to have both a steel toe and a puncture resistant sole. Clothing policy Page -5 B-471 Supplementary Staff (9 ) Categories whose job requires footwear to be worn which meet safety legislation requirements will be provided with a contribution of $10.00 towards the cost. This contribution usually applies to a summer pair but may also include an additional contribution of ~10.00 to',o/ard the cost of winter root'o'iear if necessitated 'oy the ?eriod of employ~ent. ?ootwear to qualify must ~eet the CSA green patch standard. T~is standard requires foot',iear to ha ve ooth a steel toe and a puncture resistant sole. REPLACEMENT POLICY The care of uniforms, footwear or other articles of clothing issued by th~ Authority to employees either free of charge or on a shared cost basis is a responsibility of the employee. Replacement of articles on the same basis as originally issued may be obtained when articles are no longer serviceable. For purposes of administering this policy, determination of serviceable is a responsibility of the employee's immediate supervisor. . 1983.11.18. B-472 APPENDIX 4 THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL MANUAL SECTION B - EMPLOYEE BENEFITS Executive Mtg. PERSONNEL POLICY B-1 Resolution No. GROUP INSURANCE PLAN Date: (1 ) Regular employees shall be eligible for the following benefits: (a) MAJOR MEDICAL EXPENSE 100% coverage for eligible expenses and eligible dependents and a yearly deductible of $25.00 per individual or per family appl ies; (b) DENTAL EXPENSE 100% coverage for eligible expenses and eligible dependents based on the 1980 Ontario Dental Association Fee Guide; (2 ) Full-time employees shall be eligible for the following benefits: (c) LIFE INSURANCE An amount of insurance equal to 200% of annual earnings to a maximum of $100,000.00 will be paid to the employee's estate or beneficiary; (d) ACCIDENTAL DEATH AND DISMEMBERMENT Coverage equal to the amount of life insurance; (e) SEMI PRIVATE HOSPITAL CARE. ( 3 ) The employer shall pay 100% of the monthly premium for Group Insurance Plan benefits - 17 - B-473 (11 THE METRO~O~ITAN TORONTO AND REGION CONSERVATION AUTHORITY ~ERSONNE~ MANUA~ SECTION 8 - EM~LOYEE BENEFITS Execut i ~'e Mtg. PERSONNE~ POLICY 3-2 Resolution No. SHORT TZR~ D!5~3ILITY Date: (1) This plan replaces the sick leave plans that were in effect prior to January 1, 1981. .. (2) Effective January 1, 1981, a regular employee shall, in the event of continuous illness or disability, be eligible to rec~ive salary or wages for lS weeks as follows: (a) first two weeks at 100% of regular gross earnings; (b) weeks three to lS at 7S% of regular gross earnings. (3) Th~ 75% payment can be supplemented to 100% from sick leave credits accumulated to December 31, 1980. (4) Those employees with an accumulation of sick leave credits to December 31, 1980, will be paid on termination an amount determined by: (a) length of service; (b) type of sick leave plan in effect on employment date. (5) An employee absent from work on short term disability may be required to submit a medical certificate covering the nature and duration of the illness. - - 18 - . ~ B-474 V the metropolitan toronto and region conservation authority minutes REPORT #22/83 EXECUTIVE COMMITTEE ll-JANUARY-1984 #22/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 11 January, 1984, commencing at 9 30 a m PRESENT Chairman Mrs F E Gell Vic:e-Chairman E V Kolb Members W G Barber M Ii H Biggar E Fulton Mrs L. Hancey H C Lawrie S A Macpherson Ms S Nimmo J S Scott Mrs N Stoner Authority Member J A Bryson An 'in camera' session was held on "The Metropolitan Toronto and Region Conservation Authority Rev~ew" Res. #344 Moved by M W H Biggar Seconded by W G Barber THAT Mr John P Kruger be thanked for his presentation of the draft report "Metro Toronto and Region Conservat~on Authority Review (November 1, 1983)" CARRIED It was agreed that a special meeting of the Executive Commlttee be held on 'londay, January 16, 1984, commencing at 10 00 a m for discussion of the above report DECLARATIONS Mr Fulton declared a conflict concerning Item 10 of these Minutes, and did not partlcipate in discussion or vote on the item MINUTES Res #345 Moved by H C Lawrie Seconded by W G Barber THAT the Minutes of Meeting #21/83 be approved CARRIED SECTION I FOR CONSIDERATION 1 THE LATE SPENCER W CALDWELL Res #346 Moved by E V Kolb Seconded by H C Lawrie WHEREAS Spencer W Caldwell was appointed by the Government of the Province of Ontario as a member of The Metropolitan Toronto and Region Conservation Authority from April, 1976 to February, 1983, serving on the Reforestation and Land Use Advisory Board, the Conservation Land Management Advisory Board, the Information and Education Advisory Board, the Humber Valley Advisory Board, and the Conservation Farm Sub-Committee, . B-475 -2- AND WHEREAS he was appointed by the Authority to serve on the Conservation Land Management Advisory Board and the Conservation Farm Sub-Committee from February, 1983 to February, 1984 AND WHERE Mr Caldwell was a member of The Metropolitan Toronto and Region Conservation Foundation from 1967 to 1970, a director from 1971 to 1972, a member in 1973, a director from 1974 to 1977, and a member from 1978 to 1981, AND WHEREAS his constancy and devotion to the principles of conservation, and his love of the land and living things, have encouraged and strengthened the aims and objectives of the Authority, THEREFORE THE EXECUTIVE COMMITTEE RECOMMENDS THAT on the sad occasion of the death of Mr Spencer W Caldwell on Saturday, December la, 1983, the deepest sympathy of the members and staff of The Metropolitan Toronto and Region Conservation Authority be conveyed to Mrs Nancy Caldwell, AND FURTHER THAT the invaluable contribution made by Mr Caldwell during his years of service with the Authority be gratefully acknowledged CARRIED 2 REPORT #5/83 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD Res #347 Moves'! by J S Scot t Seconded by Mrs L Hancey THAT Report #5/83 of the Flood Control & Water Conservation Advisory Board be received, AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #1 and #2, as set forth herein, be approved #1 The Project for the Dredging of the Keating Channel, Don River, 1984-1985, as appended as Schedule "A" of these Minutes, be adopted, And Further That the following action be taken in connection therewith (a) The Municipality of Metropolitan Toronto be designated as the benef~ting municipality on the basis set forth within the project (b) The Government of the Province of Ontario be requested to approve the project and a grant of 55% of the cost thereof, (cl Pursuant to Section 24 of the Conservation Authorities Act, approval of the Ontario Municipal Board be requeste~, (d) Implementation of the project be conditional upon the other participants - The Toronto Harbour Commissioners and the Federal Government - approving their share of the funding, (el When approved, the appropriate Authority officials be authorized to take whatever action is required in connection with the project, including the execution of any documents #2 The Project for Channel Improvements on the East and West Branches of the Hlghland Creek, 1984-1986, as appended as Schedule "B" of these Minutes be adopted, And Further That the following action be taken in connection therewith (al The Municipality of Metropolltan Toronto be designated as the benefiting municipality on the basis set forth in the proJec~, (b) The Government of the Province of Ontario be requested to approve the proJect and a grant of 55% of the cost thereof, (cl Pursuant to Section 24 of the Conservation Authorities Act, approval of the Ontario Municipal Board be requested, (dl When approved, the appropriate Authority offic~als be authorized to take whatever actlon is required in connection with the project, including the executlon of any documents CARRIED -3- B-476 3 STATUTORY RESOLUTIONS FOR THE TWENTY-EIGHTH ANNUAL MEETING OF THE AUTHORITY Res #348 Moved by W G. Barber - Seconded by H C Lawrie THAT the draft of Statutory Resolutions prepared for the Twenth-Eighth Annual Meeting of the Authority be received, AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the follow~ng Statutory Resolutions be adopted at the Twenth-Eighth Annual Meeting of the Authority, scheduled for February 17, 1984 (a) Aopointment of Auditors THAT Clarkson, Gordon & Company be re-appointed as Auditors of the Authority for the year 1984, (b) Borrowinc Resolution - 1984 WHEREAS it is necessary for The Metropolitan Toronto and Region Conservation Authority (hereinafter called 'the Authority') to borrow up to the sum of FIVE MILLION DOLLARS ($5,000,000 00 ) required for its purposes until payment to the Authority of any grants and of sums to be paid to the Authority by the participating municipalities designated as such under The Conservation Authorities Act, R S 0 1980, Chapter 85, as amended, BE IT THEREFORE RESOLVED 1 THAT the Authority may borrow from The Royal Bank of Canada or the Authority's member municlpalltles up to the sum of FIVE MILLION DOLLARS ($5,000,000 00 ) necessary for its purposes on the promissory note or notes of the Authority until payment to the Authority of any grants and of sums to be paid to the Authority by participating municipalities at such rate of ~nterest as the Minister of Natural Resources approves, 2 THAT the signing officers of the Authority are hereby authorized to execute for and on behalf of the Authorlty a promissory note or notes for the sum to be borrowed under paragraph numbered 1 hereof and to affix thereto the Corporate Seal of the Authorlty, 3 THAT the amount borrowed pursuant to this resolution, together wlth interest thereon at the rate approved by the Minister of Natural Resources, be a charge upon the whole of the monies received or to be received by the Authority by way of grants as and when such monies are received and of sums received or to be received by the Authority from the partic~pating municlpalities as and when such monies are received, 4 THAT the signlng officers of the Authority are hereby authorized and dlrected to apply, in payment of the mon~es borrowed pursuant to this resolution, together with interest thereon at the rate approved by the Minlster of Natural Resources, all monies recelved by the Authority by way of grants or sums received by the Authorlty from the partic~pating municipalities CARRIED 4 SCHEDULE OF MEETINGS - 1984 Res #349 Moved by M Ii H Biggar Seconded by E V Kolb THE EXECUTIVE COMMITTEE RECOMMENDS THAT the proposed Schedule of Meetings for 1984, as set forth herein, be adopted FEBRUARY l7-MARCH 2 (Adopted with 1983 Schedule) FRIDAY FEBRUARY 17 9 30 A M AUTHORITY TWENTY-EIGHTH ANNUAL Wednesday February 22 9 30 a m Executive #1 FRIDAY MARCH 2 9 30 A r:l AUTHORITY #2 (BUDGET) B-477 -4- 1984 Wednesday March 7 9 30 a m Executive #2 Wednesday March 21 9 30 a m Executive #3 APRIL Wednesday April 4 9 30 a m Executive #4 Wednesday April 18 9 30 a m Executive #5 MAY Wednesday May 2 9 30 a m Executive #6 FRIDAY MAY 4 9 30 A M AUTHORITY #3 Wednesday May 16 9 30 a m Executive #7 Wednesday May 30 9 30 a m Executive #8 JUNE Wednesday June 13 9 30 a m Executive #9 FRIDAY JUNE l5 9 30 A M AUTHORITY #4 Wednesday June 27 9 30 a m Executlve #10 JULY Wednesday July 18 9 30 a m Executive #11 AUGUST Wednesday August 15 9 30 a m Executive #12 Wednesday August 29 9 30 a m Executive #13 SEPTEMBER Wednesday September 12 9 30 a m Executive #14 Wednesday September 26 9 30 a m Executive #15 OCTOBER Wednesday October lO 9 30 a m Executive #16 FRIDAY OCTOBER 12 9 30 A M AUTHORITY #5 (PRELIM BUDGET) Wednesday October 24 9 30 a m Executive #17 NOVEMBER Wednesday November 7 9 30 a m Executive #18 Wednesday November 21 9 30 a m Executive #19 DECEMBER Wednesday December 5 9 30 a m Executive #20 Wednesday December 19 9 30 a m Executlve #21 JANUARY, 1985 Wednesday January 9 9 30 a m Executive #22 Wednesday January 23 9 30 a m Executlve #23 -5- B-478 FEBRUARY, 1985 FRIDAY FEBRUARY 8 9 30 A M AUTHORITY TWE~TY NINTH ANNUAL Wednesday February 20 9 30 a m Executive #1/84 MARCH, 1985 FRIDAY MARCH 1 9 30 A M AUTHORITY #2 (BUDGET) ADVISORY BOARD, SUB-COMMITTEE, AND ANY OTHER MEETINGS REQUIRED WILL BE HELD AT THE CALL OF THE CHAIRMAN CONCERNED (The following Statutory, Designated, and other holidays, school breaks, conference and convention dates are noted for information SCHOOL SPRING BREAKS* MARCH 12 - 23 PASSOVER APRIL 17 - 18 GOOD FRIDAY/EASTER MONDAY APRIL 20 - 23 VICTORIA DAY MAY 21 FED OF CANADIAN MUNICIPALITIES, WINNIPEG JUNE 3 - 7 DOMINION DAY JULY 2 CIVIC HOLIDAY AUGUST 6 ASSOC OF MUNICIPALITIES OF ONTARIO, TORONTO AUGUST 19 - 22 LABOUR DAY SEPTEMBER 3 BIENNIAL CONFERENCE OF CONSERVATION AUTHORITIES SEPTEMBER 16 - 19 ROSH HASHANAH SEPTEMBER 27 THANKSGIVING OCTOBER 8 HANUKKAH DECEMBER 19 CHRISTMAS DAY/BOXING DAY DECEMBER 25-26 NEW YEAR'S DAY JANUARY 1, 1985 *Two weeks are lndicated for school breaks in schedules of Metropolitan Toronto and several other municipal~ties ) CARRIED SECTION II FOR INFORMATION 5 BUSINESS ARISING FROM THE MINUTES KORTRIGHT CENTRE FOR CONSERVATION -Dlning Room L~cence Res #350 Moved by \1rs L Hancey Seconded by S A Macpherson THAT staff be directed to make appllcation to the Liqour Licence Board of Ontario for a Dlnlng Lounge Licence for the Kortright Centre for Conservat"-on CARRIED 6 CORRESPONDENCE Mr Ii A McLean, Acting General Manager, reported receipt of the following correspondence (a) Letter dated December 22, 1983 from the Minister of Tourism & Recreation, advlsing that the Authorlty has been awarded" financial assistance to conduct your w~nter youth employment project as part of the Experience '83 Program 4201 A grant cheque in the amount of 55,163 00 for the funding of 2 youths will be forwarded to your organization within the next few weeks " (b) Letter dated December 28, 1983, from the Minister of Tourism & Recreation to the Foundatlon, approving a grant of $5,000 00, which will be used for the lnstallation of an audio tour system along the newly-developed Forestry Theme interpretive trail 7 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #351 Moved by Mrs N Stoner Seconded by Mrs L Hancey THAT the applications listed hereln as A(l) to A (3 ) inclusive, be approved, subject to the conditions contained in the reports CARRIED B-479 -6- A (1) Town of Markham To construct two storm water management ponds on Part Lots 11 & 12, Concession IV, Town of Markham (Rouge River Watershed) In accordance with the following documents, which shall form part of the permit (a) "Design Brief Stormwater Management Facilities Study Area lC" prepared by Cosburn Patterson & Associates Ltd , and dated September 1983, (b) Drawings entitled "Study Area lC" accompanying the above brief, dated August 1983, and including Drawing Nos 53, 56, 57, 58, 59, and 60 A (2) Markland Wood Country Club To undertake stream bank erosion control works south of Bloor St West, City of Etobicoke (Etobicoke Creek Watershed) In accordance with the following documents and plans, which shall form part of the permit A site plan and cross section prepared by Markland Wood Country Club and submitted with the application A (3) Frenchman's Bay Yacht Club To place fill , vicinity of Frenchman Bay, Town of Pickering (Waterfront) In accordance with the followlnq documents and plans, which shall form part of the permit (a) All fill will be placed on the area indicated on the Authority's Waterfront Regulation map, Sheet #23, (b) The exact location and size of the disposal area shall be ident~fied and staked by the appropriate Authorlty staff 8 EROSION AT REAR OF NOS 19-23 CARMEL COURT, CITY OF NORTH YORK (DON RIVER WATERSHED) Res #352 Moved by M W H Biqgar Seconded by W G Barber THAT subject to approval of the 1984 .Canada Work Program - Water Resource Dlvlsion Project an appropriate level of funding be allocated to the Carmel Court erosion slte in the City of North York, AND FURTHER THAT the City of North York be so advised CARRIED 9 SALE OF SURPLUS AUTHORITY-OWNED LAND, TOWN OF VAUGHAN Res #353 Moved by Mrs L Hancey Seconded by E V Kolb WHEREAS The Metropolitan Toronto and Region Conservation Authority is in receipt of an offer from George, Daniel, and Rlchard Sant to purchase a parcel of surplus Authority-owned land, AND WHEREAS it is the opinion of the Authority that it is in the best interest of the Authority, in furthering its obJects as set out in Section 20 of the COnservatlon Authorities Act, to accept the offer at hand, THAT the Authority request approval of the Minister of Natural Resources to complete a sale of 53 2 acres, more or less, of surplus Authority- owned land, being part of Lot 32, Concession X, Town of Vaughan, to George, Daniel, and Richard Sant, at a sale prlce of 5210,000 00 -7- B-480 THAT said sale be subject to an Order-in-Council being issued in accord- ance with Section 21(c) of the Conservation Authorities Act, R S o. 1980 AND FURTHER THAT upon receipt of all approvals, the appropriate Authority officials be authorized to take whatever action may be required to com- plete the transaction, including the execution of any documents CARRIED 10 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT -Property Doverhold Investments Limited East side Livingston Road, south of Sylvan Avenue, City of Scarborough Res #354 Moved by Mrs L. Hancey Seconded by M W H Biggar THAT the report (December 16, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopt~d, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED Re Project Land Acquisition Project 1982-1984 - Lake OntarlO Waterfront Component Scarborough Sector Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property East of Livingston Road, south of Sylvan Avenue Owner Doverhold Investments Limited Area to be acquired 0 630 acres, more or less Recommended purchase price Nominal conslderation of 52 00, plus vendor's legal and survey costs "Included in the requirements for the above-noted proJect is an irregularly- shaped parcel of land, being a partial taking from a larger, multi-residential property, frontingon the east side of Livingston Road, south of Sylvan Avenue "Negotlations have been conducted with the owner and its sol~citor, Mr H J Cheeseman of the legal firm Lang, Michener, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2 00, plus vendor's legal and survey costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses lncurred inc~dental to the closing for land transfer tax, legal costs and disbursements, are to be pa~d The Authority is to receive conveyance of the land required free from encumbrance "The Adm~nistrator of the Water Resource Divis~on has reviewed this proposed acquisltion, and is in concurrence with my recommendation "An application has been made to the Minlstry of Natural Resources for an Inspection Certificate "Th~s property lS being conveyed to the Authorlty in connectlon with certain erosion control works belng carr led out along the Scarborough Bluffs " B-48l -8- 11 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT -Property Her Majesty the Queen in Right of Ontario Southerly limit of Lesll.e Street, City of Toronto Res #355 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the report (December 14, 1983) set forth herein, received from the Manager, Property & Administrative Services, be adopted, and that the Secretary-Treasurer be authorized and directed to complete the purchase CARRIED liRe Project Land Acquisition Project 1982-1984 - Lake Ontario Waterfront Component Aquatic Park Sector Authority Executive Resolution #88, Meeting #4 - April 8, 1981, and Authority. Resolution #38, Meeting #3 - May 15, 1981 Subject property Aquatic Park Owner Her Majesty the Queen in Right of Ontario Area to be acquired 624 630 acres, more or less Recommended purchase price $200 00, plus legal and survey costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Parts of Water Lot location CL3845 in Lake Ontarlo City of Toronto, situate at the southerly extremity of Leslie Street, in Lake Ontar~o "Negotiations have been conducted with officials of the Ministry of Natural Resources and other affected public bodies and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of 5200 00, plus legal and survey costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses l.ncurred incidental to the clos~ng, for land transfer tax, legal costs and disbursements, are to be paid The Authority ~s to receive conveyance of the land required free from encumbrance, w~th the exception of existing service easements "The Administrator of the Water Resource Divislon has reviewed this proposed acquisltion and is in concurrence with my recommendation "An application has been made to the Ministry of Natural Resources for an Inspection Certificate " 12 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT -Property Her MaJesty the Queen in Right of Ontario South of Lakeshore Psychiatric Hospital, vicinity Klpling Avenue/Lakeshore Boulevard, City of Etobicoke Res #356 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the report (December 15, 1983 ) set forth herein, received from the Manager, Property & Administrative Services be adopted and that the Secretary-Treasurer be authorlzed and directed to complete the purchase CARRIED liRe Project Land Acquis~tion Project 1982-1984 - Lake Ontario Waterfront Component Colonel Samuel Smlth Area Authority Executive Resolution #88, Meeting #4 - April 8, 1981 and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property South of Lakeshore Psychiatric Hospital Owner Her Majesty the Queen In Right of Ontario -9- B-482 Area to be acquired 161 557 acres, more or less Recommended purchase price $200 00, plus legal and survey costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Water Lot location CL3406 in Lake Ontario, opposite Lots 5 and 6, B F C , City of Etobicoke, situate south of the Lakeshore Psychiatric Hospital, in the vicinity of Kipling Avenue and Lakeshore Boulevard "Negotiations have been conducted with officials of the Ministry of Natural Resources and other affected public bodies, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the sum of $200 00, plus legal and survey costs, with date of completing the transaction to be as soon as possible "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the clos~ng, for land transfer tax, leqal costs and disbursements are to be paid The Authorlty is to receive conveyance of the land required free from encumbrance with the exception of existing service easements "The Administrator of the Watgr Resource Dlvision has reviewed this proposed acquisition, and is in concurrence with my recommendation "An application has been made to the Ministry of Natur al Resources for an Inspection Certlficate " 13 USE OF VEHICLES ON AUTHORITY LANDS -Operatlng Directive Res #357 Moved by W G Barber Seconded by H C Lawrie THAT the "Operating Directive for. the Use of Vehicles and Equi pmen t on Authorl ty Owned Lands", as appended as Schedule "C" of these Minutes, be adopted for the operation of all vehicles and equipment on M T R C.A lands whlch have been developed and opened for public use, and wh~ch are managed by the Authority CARRIED 14 COLD CREEK CONSERVATION AREA -Operatlon Res #358 Moved by M W H Biggar Seconded by E V Kolb THAT the shooting ranges at the Cold Creek Conservation Area cease operation on week-ends and holidays at 5 00 p m CARRIED 15 REPORT #2/83 - ETOBICOKE-MIMICO ADVISORY BOARD Res #359 Moved by S A Macpherson Seconded by J S Scott THAT Report #2/83 of the Etoblcoke-Mim~co Advlsory Board, as amended, be received, AND FURTHER THAT Recommendations #1, #2, #3, #4, and #5, as set forth herein, be approved #1 That the City of Mississauga, in its current preparation of a comprehensive Plan for the Provision of Open Space and Recreation Facil~ties for the municipality be requested to give consideration to establ~shing the necessary links w~th existing and proposed Etobicoke and Metropolitan facilities in the Etobicoke Creek toward the implementat~on of the Linear Park Plan, particularly in the Sherway area between the Cities of Etobicoke and Mississauga B-483 -10- #2 That the Authority be advised that the report entitled "Toronto Area Watershed Management Strategy Study (TAWMS) - Results of the 1981 Progress Report" , and reports of this kind in which no recommendations are included, are not sent forward, but are presented to the Executive Committee for information .. #3 That the staff ascertain whether or not there will be adequate monitoring of the Mimico Creek, and if it appears that there would not be adequate monitoring of pollutants and other elements of water quality, the staff prepare a plan for it to be done #4 That the Authority obtain, in wri Ung , from the boating clubs at Humber Bay, an undertaking concerning future public access to club . property, And Further That consultation take place (Authority-Metropolitan Toronto-Etobicoke) prior to preparation of lease agreements so that public participation will be ensured #5 That the bank stabilization program of lands on the west side of the Etobicoke Creek between the Queensway and the Sherway Drive bridge, identified as the highest prlorlty by the Etobicoke-Mimico Advisory Board at its meeting held June 3, 1983, be referred to staff for technical evaluation, And Further That the area concerned be included on the priority list now in process of being compiled CARRIED 16 NEW BUSINESS Mr Scott lnformed the members of the recent death of Mr Cl-are Balsdon, former .. Authority member and Township of Pickering Councillor 17 TERMINATION On motion, the meeting was terminated at 12 20 p m , January ll, 1984 Florence E Gell W E Jones Chalrman Secretary-Treasurer KC B-484 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY , "PROJECT FOR THE DREDGING OF THE KEATING CHANNEL DON RIVER, 1984 - 1985" DECEMBER, 19A3 B-485 -2- CONTENTS - I PURPOSE OF THE PROJECT II LOCATION AND DESCRIPTION III COSTS AND FINANCING . IV AGREEMENTS -3- B-486 PURPOSE - The purpose of this project is to permit the Metropolitan Toronto and Region Conservation Authority to exercise the powers afforded by the Conservation Authorities Act R S 0 1970, Chap 78 as amended to establish and unqertake in the area over which it has jurisdiction, a program designed to further the conservation, restoration, development and management of natural resources in accordance with the Flood Control Program of the Watershed Plan The purpose, of this project is to meet one of the defined objectives of the Flood Control Program which is to provide in defined flood damage centres, on a priority basis, protection that will reduce the risk of flooding to less than 50% over the life (100 years) of the affected structure(s) Protection to a higher level will be provided if economically and/or socially justified Through this project, the Metropolitan Toronto and Region Conservation Authority will provide part of the funding for the first two years of a six year project required to dredge the Keating Channel at the mouth of the Don River The dredg ing is required to mil'limize the potential flood hazard, reduce pollution of the Inner Harbour; and ~ai~tain the northeast corner of the harbour for shipping This project will be undertaken in accordance with the requirements of the Snvironrnental assessment Act - B-487 -4- LOCATION AND DESCRIPTION The Keating Channel Environmental Assessment provides a complete description of the work proposed in this project The following is a brief description of the principle components of the problem and the proposed solution The Keating Channel is the man made mouth of the Don River where it empties into the northeast corner of Toronto's Inner Harbour Each year about 50,000 cubic meters (m ) of sediment are deposited by the Don River into the Keating Channel .Hong wi th the sediment comes pollutants, which are derived throughout the watershed and adhere to the fine grained sediment which is deposited in the Channel or carried out into the Harbour The deposition of this material within the Keating Channel and the northeast corner of the Inner Harbour makes these areas virtually unusable for shipping unless regular maintenance dredging is per formed This same siltation restricts the flow of flood waters and thus greatly increases the potential for flood ins particularly as a result of ice jams When dredged, the Keating Channel acted as an effective sedimentation trap but now sediments flow into the Harbour and must be removed annually to preserve boat access to commercial docks In 1972, Canada and the United States signed a joint agreement to improve water quality in the Great La ke s system One important result was a complete ban on the open water dIsposal of polluted dredgeate Un t il 1974 the Toronto Harbour Commissioners were able to dispose of the polluted dredgeate in a reasonably economic fashion, the method used at the time was to bury the material under the advancing fill at the Outer Harbour Headland However, as a result of the ban on open water dumping, the dredging was discontinued principally because of the high cost of any acceptable alternatives for disposal In 197Q, plans for a confined disposal area at the Outer Harbour Headland '....ere implemented This facility has been used to a limited extent for the disposal of material dredged for navigation purposes since 1981 -5- B-488 Since halting the dredging operations, approximately 400,000 cubic meters of sediment have collected within the ~eating Channel Area This - Authority through "The Interim Water and Related Land Management Project 1979 - 1981 for the Dredging of the Keating Channel, Don River" supported works undertaken by the Toronto Harbour Commissioners in an initial dredging project While some dredging was undertaken through this project, a significant quantity of sediment remains within the Keating Channel pending the results of the Environmental Assessment A revised dredging program has been established proposing a six year effort to complete th~ necessary dredging works This Project outlines the involvement of the Authority over the fir st two years of the six year project A subsequent project will be developed to complete the work following receipt of the final decision on the Environmental Assessment The dredging being proposed will be undertaken by crews and equipment of the Toronto Harbour Commissioners The sediment removed from the Keating Channel will be placed into botto~ dumping scows and towed to the disposal facility at the Outer Harbour Headland It should be noted that following the six year project required to fully dredge the Keating Channel area, maintena~ce dredging will still remain a requirement to ensure the fulfillment of the objectives met through the dredging project - B-489 -6- COST AND FINANCING The costs associated with this two year project include Legal and survey fees, land acquisition, engineering and environmental studies, labour, equipment and material costs associated with the dredging and material disposal, all costs incurred in relation to the Environmental Assessment Act approval requirements COSTS The cost for the dredging project will be apportioned between, the Toronto Harbour Commissioners, The Government of Canada and The Metropolitan Toronto and Region Conservation Authority, with each agency responsible for one third of the project costs The cost apportionment allocated to The Metropolitan Toronto and Region Conservation Authority for its two year project is $350,000 per annum or a to tal cost of $700,000 FINANCING It is proposed that the fund s required for this project be raised or. the basis of a 55~ grant from the Province of Ontario and 45% from the Municipality of Metropolitan Toronto as benefitting municipality 1984 1985 Province of Ontario $192,500 $192,500 Municipality of Metropolitan $15",500 $157,500 Toronto TOTAL $350,000 $350,000 -7- 8-490 AGREEMENTS In undertaking this Project, the Authority will be entering into a three party agreement where the costs shall be apportioned on an equal basis The other parties involved being the Toronto Commissioners and the Federal Government through Transport Canada . N jf -- LESLIE STREET SPIT TORONTO TORONTO INNER OUTER HARBOUR HARBOUR - CEll No,l - CELL No,2 CEll No 3 .- 0 ~oo 1000 t.= - 1 IolETRE5 , ~ FIG I ~ Ih. I...""""".... ;"''''10.... ...... conservation authontv GEN:::~':A~;;;:~T s:;:: 11~IR I - . . 1 - - -- , ~ . <. . , , ~....' .;. , ' ..; .. " ~ . ,. ;.....' . ,. 'X \~ , ,:~ \ .- '"' .:.... ~ .. ~......- ''I "i. '\.'.~' _ ..1 J ' ... . r' Ji. ." , ~ ......,,;:.;. ~ :~ ~ , ':(:.; "'" .- ~. ; ..: > .. <~, ; .....;....." v . . . -::' ... I ." . ~I I . " " , - , .. ;.;. .. - ;, . V". . . -,.... TORONTO HARBOUR COMMISSIONERS' DERRICK #50 DREDGING KEATING CHANNEL, DRYDOCK AND OTHER MARINE USES OF THE AREA NOW ABANDONED. JUNE 25, 1965 . -- :T_T~T('~' r'l.""--~ ..... ,u'... ~' 1: . .'~,r ,~~,:~.~"".~ .~;',....":'"".. ~-::..^~ .:.o.,.~. ...._,e'~.. : ~-C~~,,:.~""~ r... - '. " ~~.'- "" ~", - ~- . ~ -' ,-r#> . .....ttr....~,., ~~ ~~__.' ... : "'JV~ .. ."400___ ~.... ..." -...... 'iI ....".. ~ '''... .. . 7' ..., - - " -if_ l' . - 'A ./.' ... _ -. .' .~.. ."( r":"~)"'.....""""'--'~'" ... ;..""" .. -.. ....._.... ~ ~ A'" ~. ....< . . '" ... ,.~_ .. ~ ., ~ \. ~ . "" , 1........ . ~ - ~ ,'..It' -..., _ ....:).___......-t; . ...,..., -" ~ ~ ~~ " ~ ~ _ -. ... .)~"it...., :~~ ~,. ,. ~..' ....-.. ..". -, ~ \. '"' i......~ ~ ,- ....~. ".a. ".~:....p;.; ,. "1 ' ~ .. · ~, .. --'**- * ... .... .,...,. .. ..... ,. '. ~ .." ....~r.'.,." . -t.:I .f:::' r ~ T './{ - '.... ~.,. ." . ~' ,,' A:' .~' . -, ~.. .... ~:.. ',L, ,.,."{, . J r: . '" -.-.. JI/It, ~'" . .~ ';.:J;J.;."::: (....,., ~..... .,.... t- "-~r'W' ' " .....,.,. _ '~ ,__t'<' _ '1~ 'f:.. ~J.. "'u . ... ~.,; ~ , ~ l ','\. ,'':I''... ' J '""" '..... 'l....., A.' 'C' ." ~...,,; (, " ~ J...... -'., "I' .... -~, ...1""''''' ~" v,.,~ ~ .,:, ;..~... ....~ ~~ . . ,....' ." .. - . ~. " '., - . ',' ..~. ~ . ~" ,." ~ ...... "'" .... -~ .. .".. .,........... . .. ... ~...".,..... Ii · :, ;~ . ,~'" )',). - .Jt "1,.,. ~.k1 ''''\C' ,.r ~ .~' ,~...: ""'.J:" .,' ~it.~"";'i" '\" ',~ ,.., i ICE JAM RESULTING IN WATER RISING TO WITHIN 6" OF TOP OF THE WALL. JANUARY 26, 1978. B-494 SCHEDULE "B" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY "A PROJECT FOR CHANNEL IMPROVEMENTS ON THE EAST AND WEST BRANCHES OF HIGHLAND CREEK" 1qR4-1986 AUGUST, 1983 B-495 CONTENTS I PURPOSE OF PROJECT - . II LOCATION AND DESCRIPTION III COSTS AND FINANCING IV AUTHORITY APPROVALS AND REQUESTS V LAND VAUES VI AGREEMENTS VII APPENDIX (i) Technical data sheets, cost benefit analysis sheets and site plans for the 1984, 1985, 1986 work sites listed below 1984 1 MB 12050 2 MAL 10230 3 MB 11150 4 MB 11050 5 MB 11310 6 MB 11130 , 7 MB 11330 . 8 MB 11550 1985 1 EB 9100 . 2 WB 8400 3 WB 8830 4 WB 8900 5 WB 9270 1986 (See Site Location Map for 1986) 1 EB 10350 EB 1 EB 2 EB 3 EB 4 EB 5 8-496 - 1 - I PURPOSE OF PROJECT The purpose of this project is to enable The Metropolitan Toronto and Region Conservation Authority to continue to carry out channel improvements on the East Branch of the Highland Creek and further to extend remedial works to the West Branch between Lawrence Avenue and the Scarborough Golf Course The project covers a three year period from 1984-1986 The goal of the Authority through this project is to minimize the hazards of erosion to life and property on the Highland Creek Watershed in the Municipality of Metropolitan Toronto and is a continuation of the work initially undertaken in the "Projects for Channel Improvements on the East Branch of Highland Creek 1982 and 1983" To achieve its goal thr Authority has defined the following objectives ( a) to implement a program of site specific remedial works based on a priority ranking of sites as defined and outlined in the 'Preliminary Engineering Study on Erosion Control, East Branch - Highland Creek' , (b) to recognize the i~portance of the natural valley character in the design of remedial works wherever feasible This project will be carried out in accordance with the requirements of the Environmental Assessment Act and addressed in the 'Class Environmental Assessment for Erosion and Sediment Control' B-497 - 2 - II LOCATION AND DESCRIPTION Significant erosion has been occurring during both high flow and low flow periods along the unprotected East Branch of the Highland Creek and an unprotected section of the West Branch between Lawrence Avenue and Scarborough Golf Course as illustrated by the shaded ~rea on Figure 1 The very active erosion which is apparent through these ~ sections is caused by a combination of the fo llowi ng (i) the marginally stable slopes left as a result of the major flood s in August of 1976, (ii) high flow veloc it ies , . (iii) the erosion susceptible soils which make up the channel and valley walls, (iv) the highly urbanized character of most of the watershed which leads to increases in peak flows, velocities and frequency of flooding The erosion of the stream bank and, in some instances, the valley wall is having an impact on the terrestrial communities and has resulted in the loss of large wooded areas The potential also exists for the activity to eventually subject a significant number of residences to a potential hazard The existing erosion is affecting municipal services and existing hydraulic structures located in the floodpl<?in, and restricts the use of valley land for park purposes as seen in the attached photographs In response to concerns expressed by The Metropolitan Toronto and Region Conservation Authority, the Borough of Scarborough, the l~e t ro po li tan Toronto Parks and Property Department and Metropolitan Toronto Works Department, the firm of Cumming-Cockburn and Associates Limited was authorized by the Conservation Authority to undertake a study to identify the most serious erosion areas and to develop a long-term program for mitigating problems associated with erosion along the study area The reach of Highland Creek to be analyzed for erosion problems included West Branch - From Lawrence Avenue upstream 1 km East Branch - From confluence with West Branch to the confluence with the Malvern Branch Malvern Branch - From its confluence with the East Branch to Highway 401 11a r kh am Branch - From its confluence with the Malvern Branch to the Scarborough Channel The consultants have recommended that the most feasible course of action to solve the erosion problem within the study area would be to carry out remedial works on a high hazard site specific basis The advantages for carrying out works in this manner include, maximum benefit for capital expenditure , expediency in resolving erosion problems and the capability of focussing the construction activity in the areas of highest priority first In order to determine the order of priority for future works, an inventory of erosion sites was carried out and a weighting system was developed to rank the sites The weighting system developed, assessed such parameters as ( i) existing and future potential for lateral movement of the stream bank, (ii) proximity of structures to the erosion problem, (i i i) environmental significance of the area, (iv) rate of erosion, (v) soil characteristics of the effected bank, B-498 PROJECT FOR CHANNEL IMPROVEMENTS ON THE EAST 8 WEST BRANCHES OF HIGHLAND CREEK I '" HWY. 401 i 3: ~ (l'i ~ ~ C,N.R, / ~~f ~ '""'-.:.../ ~ ~~ ~/ ONfARIO ~r t.AKE ~~ ~ /7 111111111111 AREAS OF S1GNIFICA~T EROSION FIG. I B-499 . THESE PHOTOS REPRESENT THE TWO HIGH PRIORITY SITES (ME 12050 & MAL 10230) BEING CONSIDERED FOR REMEDIAL WORKS UNDER THIS PROJECT. B-,50( . EROSION DAMAGES TO SERVICES IN THE FLOODPLAIN 501 '. i ~ ~\J "'i - ~ EROSION ON THE MARKHAM BRANCH OF THE EAST HIGHLAND CREEK Notice both the coincident valley wall erosion which is encroaching into useable tableland areas and also the extensive riverbank erosion. - . EB9100 puB I Ind8ll Key ~ ......... --- c....~ In -U~I I Ref o'CJC? II L..... Ont.ftoQ I W.t_COUfM Abbr-.t--. . PLT A Pr_.I't Lt" ""......- Abbr.VlaItion K.~ ....L ...I"...It BrIlftCJl MB ""kMm Ikand! MBII550 PH A Edt BrMCtl EB WB West Br-.dl 1.1812250 puB puA SI.tMJll,plw:aEft'f..~ ' \~~"~.." P\.1 B S4~IIrt)' P'uS ttaz...d '. "I ,. I i :.,/ ....;- ", I WB9210P1.TA "'Iropoli.l_ 'CM~....:I ....- c:c.....qt.. auu.", I CummIng-Cockburn & Aaaoct.ln Limited I "" 0 "" A Pr~, l~".., ltuctr oa Erot:lOft Co.-I,ot IOf I fast Ikaow:tl hogllfMwl Cr..... ae... tm_ Plan of Erosion Sensitive Areas Site I 2 ! f'WW.' 11l I l.T C l'... B-5C3 - 8 - Figure 2 indicates the location of the sites inventoried and identified in the report Table I lists in order the top ten sites determined to be the most serious o~ hazardous of the sites inventoried As a result of the number of sites inventoried, the Authority is proposing to apportion the remedial works required over a three (3) year period The proposed remedial works for the most part will be carried out on a priority basis established by the consultants However in order to minimize the disturbance and the environmental effects of the construction to the areas and further to maximize the use of our access roads and work yards, some of the lesser ranking sites will be worked on during the same time as the high priority sites if they are in the same area Erosion protection remedial works for the priority sites where structures are affected must be tailored to suit the particular conditions at each location To stabilize these areas, alternative forms of protection and materials were evaluated in order to select the most appropriate and economically viable solution The preliminary designs developed by the consultants will be fine tuned by Authority staff for implementation in the field A standard design approach has been developed where previous development or structures are not as yet affected but where significant amount of erosion is still occurring An example of a typical design solution for this type of problem is shown in Figure 3, while following is a description of this -solution (i) Regrading of affected bank to a minimum 2 1 slope, (ii) Placement of a 400 mm thick well graded granular base (or and equivalent filter cloth), (iii) Placement of an average 450-550 mm layer of rip rap protection, (iv) Placement of rip rap protection to a minimum height of two metres above the existing invert This would provide complete toe protection for the annual runoff event (v) Extend rip rap protection upstream to where the existing channel is stable If the rip rap cannot be tied into a stable section, a rock cut-off wall should be constructed Attached in the appendices are location plans, technical data sheets and cost/benefit analysis sheets for all of the sites being considered for remedial works under this project Following is the proposed work program for the 3 year project, which lists the site and the projected work year TYPICAL CHANNEL SECTION 3 /REVEGr:TATE WITH SHRUBS e. TREES -------.J' /100 YR FLOOD ELEVATION EXISTING PROFILE 250mm - 600mm RIP RAP " \J ~ I I CLEAN OUT GRANULAR A BACKFIL L 270R TERRAFIX FILTER FIG. 3 tJ:I I U1 B-50S - 10 - PROPOSED WORK PROGRAM - FOR HIGHLAND CREEK 1984 1 MB 12050 HIGHLAND CR~EK I/R4 2 MAL 102'lO 3 MB 111 <;0 4 MB 11050 5 MB 11310 HIGHLAND CREEK II/R4 6 MB 11 no 7 MB 1 n30 fl MB 11550 19R5 1 EB 9100 2 WB R400 '1 WB RR'~O 4 WB SJ900 5 WB 9270 1qRfi (See Site Location Map for 19R6) 1 EB 10150 EB 1 EB 2 EB 3 EB u EB 5 B-506 - 11 - TABLE I SUMMARY OF HIGH PRIORITY SITES PRIORITY SITE (STATION) 1 MAL 10230 2 MB 12050 3 WB 8830 4 MB 12300 5 MB 11310 6 WB 9270 7 EB 8500 g liB 3900 9 EB 8870 10 MB 11550 NOTE Refer to Figure 2 for location of High Priority Sites B-507 - 12 - III COSTS AND FINANCING The expenditures required to implement this project are based on the . best information currently available for works to be undertaken The costs stated shall be understood to include legal and survey fees, engineering and geotechnical studies, site supervision and all materials, labour, equipment, etc associated with the construction The proposed allocation of funding for these works on an annual basis is as follows COSTS YEAR 1984 1985 1986 TOTAL $540,000 $350,000 $350,000 FINANCING The total cost of the three year project is $1,240,000 and the yearly costs will be funded as follows 1984 Authority - $243,000 Province of Ontario - $297,000 Total Annual Cost $540,000 1985 Authority - $157,500 Province of Ontario - $192,500 Total Annual Cost $350,000 1986 Authority - $157,500 Province of Ontartio - $192,500 Total Annual Cost $350,000 The Municipality of Metropolitan Toronto is designated as the benefiting municipality to raise the Authority's share of the work B-508 - 13 - IV AUTHORITY APPROVALS AND REQUESTS Authority Motion Letter to Metro Metro's Approval Letter to Minister '=-509 SCHEDULE "C" OPERATING DIRECTIVE FOR THE USE OF VEHICLES AND EQUIPMENT ON AUTHORITY OWNED LANDS 1 In this directive, "vehicles" refers to any self-powered unit, automobile, truck, tractor, riding mower, etc 2 In this directive, "Conservation Areas" refers to all or any Authority owned lands which have been developed for public access and are managed by the Authority 3 That every effort be made to minimize the number of vehicles generally used in servicing Conservation Areas. 4 That every vehicle travelling in or through a park, and not on a park roadway, be required to use its 4-way flashing lights, and that a decal be posted within the vehicle advising employees of this policy 5 That no vehicle shall be permitted to exceed a speed of 20 km/hr while driving or operating in a Conservation Area unless otherwise posted 6 That the posted speed limi~ of 30 km/hr on a park roadway be adhered to 7 That whenever possible, the vehicle is to be parked in such a manner that it can be driven away in a forward direction B That any vehicle requiring to back up in a park shall be directed by a second employee who shall locate himself in clear view behind the vehicle Should an operator be alone, then he shall back up only after circling the vehicle 9 That every attempt be made to schedule the use of vehicles in parks to periods when the park is not heavily used 10 That nothing be stored on the dash of Authority vehicles (paper, tools, lunch buckets, etc ) that may reduce the visibility of the operator 11 That these directives apply to all Authority Divisions and outside agencies, and that all agencies be notified of these directives with a req~est that their operators be so informed and that they attempt to minimize their travel in Conservation Areas 12 That the posted decal referred to in Item 4 is not required for outside agencies l3 That obstacles which may block the view of small children adjacent to service areas, and park access routes, be relocated a minimum of three (3) meters distance from the vehicle route l4 That future Conservation Area design plans attempt to provide service access to park facilities that do not conflict with high use public areas 15 That the operator or driver of any vehicle or equipment remove the key when he leaves the unit, and that if a vehicle is to be left unattended, that it be locked 16 That every employee who may be required to operate a vehicle or equipment in a park be made aware of these directives 1984 01 04 ~ B-5l0 , the metropolitan toronto and region conservation authority minutes EXECUTIVE COMMITTEE 16-JANUARY-1984 REPORT #23/83 (SPECIAL MEETING) A Special Meeting of the Executive Committee was held at the Authority Office, 5 Shoreham, Downsview, on Monday, 16 January, 1984, commencing at 10 00 a m PRESENT Chairman Mrs F E Gell Vice-Chairman E V Kolb Members W G Barber M Ii H Biggar (Fo~ Ms S Nimmo) J A Bryson E A Fulton Mrs L Hancey H C Lawrie S A Macpherson Mrs N Stoner ABSENT Members Ms S Nimmo J S Scott At Meeting #22/83 of the Executive Committee, held January 11, 1984, it was agreed that a special meeting of the Comm~ttee would be convened on Monday, January 16 to dlscuss the report "Metro Toronto and Region Conservation Authority Revlew (November 1, 1983)" This being a special meeting, no minutes were presented It was agreed that the report be re-drafted by the Acting General Manager to lncorporate changes agreed upon at today's meeting and on file with the Authority's representat~ves on the Pollcy and Steering Committee, and that the report be submitted to the Policy and Steering Committee for further conslderation The meeting was termlnated at 12 45 P m , January 16 Florence Gell W E Jones Chalrman Secretary-Treasurer KC ~ B-5ll V the metropolitan toronto and region conservation authority minutes REPORT #24/83 EXECUTIVE COMMITTEE 25-JANUARY-1984 #24/83 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, 25 January, 1984, commenclng at 9 30 a m PRESENT Chairman Mrs F E. Gell Vice-Chairman E V Kolb Members W G Barber M W H Biggar E.A. Fulton Mrs L Hancey (For H C Lawrie) 0 Jackson S A Macpherson Ms S Nimmo Mrs N Stoner Authority Member J A Bryson Gardiner, Roberts B Casey ABSENT Members H C Lawrie I J S Scott "lINUTES Res #360 Moved by W G Barber Seconded by Mrs N Stoner THAT the Minutes of Meeting #22/83 be approved, CARRIED DECLARATIONS Mr Barber declared a conflict concerning Item 5 of these Minutes, and did not part~clpate in dlscussion or vote on the ~tem SECTION I FOR CONSIDERATION 1 THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Reappointment of Members Res #361 Moved by Mrs L Hancey Seconded by Mrs N Stoner THE EXECUTIVE COMMITTEE RECOMMENDS THAT the following members be re-appointed to The Metropolitan Toronto and Reg~on Conservation Foundation for further three-year terms Mrs J A Gardner - February 21, 1984 - February 21, 1987 Mr D Melnik, Q C - February 21, 1984 - February 21, 1987 Mr MOP Morrison - March 2, 1984 - 'larch 2, 1987 CARR~ED B-5l2 -2- SECTION II FOR INFORMATION 2 MR KENNETH G HIGGS - SEPARATION SETTLEMENT Res #362 Moved by Mrs N Stoner Seconded by E V Kolb THAT the Secretary-Treasurer and Authority Counsel be authorized and directed to complete a separation settlement with Mr Kenneth G Hig9s on the basis agreed to as between Authority Counsel and Counsel for Mr Higgs CARRIED UNANIMOUSLY 3 CORRESPONDENCE Mr W A McLean, Acting General Manager, reported receipt of the following correspondence Letter dated January 18, 1984 to the Chairman from Mrs Nancy Caldwell, thanking the Authority for flowers sent for her husband's funeral, and expressing her appreciation to members and staff who attended the memorial service 4 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170 Res #363 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the applicatlons listed herein as A (1) to A(5) inclusive, be approved, subject to the conditions contalned in the reports CARRIED An) Donald Hayhoe To construct off-stream pond, south side Highway #49, west of Highway #27, Town of Vaughan (Humber River Watershed) In accordance with the following documents, which shall form part of the permit A Pond and Site Development Study Plan submitted wlth the appllcation A(2) Town of Vaughan To place fill within regulated area, Lot 28, Concession III Town of Vaughan (Don River Watershed) In accordance with the followlng documents and plans, which shall form part of the permit Drawlng #2, West Don Soccer Field, as prepared by the Town of Vaughan Parks & Recreatlon Department A(3) Markham Congregation of Jehovah's Witnesses To construct building and associated parklng facilities, south of Highway #7, east side McCowan Road, Town of Markham (Rouge River Watershed) In accordance with the follow~ng documents and plans, which shall form part of the permit All works being completed in accordance with the site plan, Sheet #1, as drawn by T Luff, certified by D Petrie, P Eng , and dated August 12, 1983 (Revislon Oct 11, 1983 ) -3- B-513 A(4) Town of Markham To construct two channels and two detention ponds in two branches of the Morningside Tributary of the Rouge River, Lots 1 and 3, Concession VIII In accordance with the following documents and plans, which shall form part of the permit .. (a) Project #82021, Drawings Ll, L2, and Cl to C12 inclusive, by Andrew Brodie Associates Inc , and dated October and November, 1983, (b) The report entitled "Town of Markham Armadale Community (Area lA) Design of Stormwater Detention Ponds, Channels and Trunk Storm Sewers Of , dated November 11, 1983, by Andrew Brodie As~ociates Inc (c) Notes and calculations for the South Pond Inlet Structure by . Andrew Brodie Associates Inc A (5) Reddington Properties Management Ltd ~o lnstall, 74" x 50 " corrugated steel culvert in the Centreville Creek, East Half Lot 3, Concession III, Town of Caledon Humber River Watershed) In accordance w~th the following documents and plans, which shall form part of the permit (a) All work shall be undertaken and completed in accordance with Contract Drawing #2 (the original, as prepared by Paul Theil Associates) , and modified by Patrlck Falby & Associates in June. 1982, (b) Sil~~tlon traps shall be installed and kept in good condition and in place until all construction has been completed as it relates1to the creek crossing . . 5 HUMBER RIVER CHANNEL IMPROVEMENTS CONTRACT - PHASE II -Extra Work Orders Nos 4, 5 , and 6 Res =F364 ;'loved by Mrs N Stoner Seconded by '.'I G Barber THAT Extra Work Orders :-los <: , 5, and 6 to the contract for the Humber River Channel Improvements Contract ?hase II in the former Village of Bolton, in the amounts of 52,425 75, $936 60, and 5945 00 respectively be approved, AND FURTHER THAT the approval of the Min~stry of Natural Resources be requested C.l\RRIED 6 CLAIREVILLE DAM -Replacement of Sumo Pumps Res #365 Moved by 14rs N Stoner Seconded by W G Barber ~HAT the firm of T V S ?umps be retained to replace the sump pump system at the Clairevllle Reservolr at a cost not to exceed $2,224 00 CARRIED 7 LAND ACQUISITION ~ROJECT 1982-1984 ROUGE RIVER WATERSHED -Property The Mun~clpality of Metropolitan Toronto VlClnlty of 'leadowvale Road, north of Sheppard Avenue, Clty of Scarborough Res #366 Moved by W G Barber Seconded by Mrs N Stoner THAT the report (January 16, 1984) set forth hereln, received from the Manager Property & Adminls~ratlve Services, be adopted, and that the Secretary-Treasurer be authorized and directed ~o complete the purchase CARRIED B-514 -4- Re Project Land Acqu~sition Project 1982-1984 - Flood Plain & Conservation Land Component Rouge River Watershed Authority Executlve Resolution #88, Meeting #4 _ April 8, 1981, and Authority Resolution #38, Meeting #3 - May 15, 1981 Subject property Vicinity of Meadowvale Road, north of Sheppard Avenue Owner The Municipality of Metropoli tan Toronto Area to be acquired 9 435 acres, more or less Recommended purchase price Nominal consideration of $2 00, plus vendor's legal and survey costs "Included In the requirements for the above-noted project are several small parcels of land, being composed of Parts of Lots 4 and 5, Concession III, and Parts of Road Allowance between Lots 4 and 5, Concession III, City of Scarborough (The Municipality of Metropolltan Toronto), said land situate in the vicinity of Meadowvale Road, north of Sheppard Avenue "Negotiations have been conducted wlth officials of The Municipal~ty of Metropolitan Toronto and, subject to the approval of your Comm~ttee, agreement has been reached with respect to a purchase price, as follows The purchase price is to be the nominal consideration of $2 00, plus vendor's legal and survey costs with date of completing the transaction to be as soon as possible "I recommend approval of this purchase, and that the legal firm of Gardiner, Roberts be instructed to complete the purchase All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid The Authority lS to receive conveyance of the land required free from e~cumbrance, with the exception of existing service easements "The Admlnistrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation An applicatlon has been made to the Mlnistry of Natural Resources for an Inspection Certificate " 8 ALBION HILLS CONSERVATION FIELD CENTRE -Quotation #I&E2/84 Kitchen Renovations Res #367 Moved by Mrs N Stoner Seconded by D Jackson THAT subject to obtaining the approval of the Board of Education for the City of Etobicoke, the contract for renovatlons of the kitchen at the Albion Hills Conservation F~eld Centre be awarded to Falrwin Constructlon Company Limited, in the amount of $58,750 00, it being the lowest quotation received AND FURTHER THAT the staff be author~zed to make any deletions required to keep within budget CARRIED 9 ALBION HILLS CONSERVATION FIELD CENTRE -Quotation #I&E3/84 Kltchen Equipment Res #368 Moved by Mrs N Stoner Seconded by M W H Biggar THAT subject to obtainlng the approval of the Board of Education for the City of Etobicoke the contract for the supply of Food Servlce equipment for the Albion Hills Conservatlon Fleld Centre be awarded to Artlstlc Restaurant Equipment Limited, in the amount of $20 l4l 00, it belng the lowest quotatlon recelved AND FURTHER THAT the staff be authorized to make any deletions required to keep within budget CARRIED -5- B-51S 10 ACCOUNTS FOR THE PERIOD DECEMBER 4-31, 1983 Res #369 Moved by M W H Biggar Seconded by D Jackson THAT accounts, aggregating $2,812,816 00, for the period December 4, 1983 to December 31, 1983, be approved for payment (~ists of accounts on file in the Accounting Section) 4 4 CARRIED 11 STAFF FINANCIAL PROGRESS REPORT -October l/December 31, 1983 , Res #370 Moved by E.A Fulton Seconded by . Mrs N. Stoner . THAT the Chairman be requested to contact the Minister of the Environment to determine the status of the Authority's application for exemption under the Environmental Assessment Act for the Shoreline Management Project on South Marlne Drive CARRIED Res #371 Moved by S A Macpherson Seconded by E A Fulton THAT the Staff Financial Progress Report for the period October 1 to December 31, 1983, as appended as Schedule "A" of these Minutes be received CARRIED 12 REPORT #4/8: OF THE MARKETING PLAN SUB-COMMITTEE Res #372 Moved by D Jackson Seconded by M W H' Biggar .I THAT Report #4/83 of the Marketing Plan Sub-Committee be recel~ed, AND fURTHER THAT the following action be taken (al The Report "1984 Marketing Plan" be received as revised, (bl The recommendations regarding marketlng, adopted by the Executive Committee In May, 1983 be affirmed, (c) The "Product Improvement Requirements" (Table 1) beyond 1984 be recommended to the appropriate advisory commlttee for reVlew and recommendatlon (d) The items identifled on Table 3 be included in the 1984 Budget (e) Staff be directed to prepare, during 1984, a lO-year Concept Plan for Publlc Use Facillties complementary to the work currently belng undertaken by Metropolltan ~oronto, (f) Staff identify the costs involved in establishing a higher level of facility maintenance and, where appropriate, staffing to ensure vlsitor satlsfaction, (q) The "1984" Programs and Events" (Table 2) be approved and lmplemented (h) The concept of prlcil'1g packages, including the proposed "Super Pass" be approved, in principle, subJect to a comprehensive pricing schedule being provlded for cons~deration by the Executive Committee, (i) The concept of "theming" of Conservation Areas be approved, (j) During 1984, the summer hours at the Kortright Centre for Conservation be extended, (f-) During 1984, the hours, days, and months of operating at all facilities be revlewed to ensure that operations are cost- effective B-516 -6- (1) Staff be directed to develop the necessary lists to initiate or improve the distribution of promotional material to specific target groups, (m) The Staff Comm~ttee on Marketing be continued and that the Acting General Manager be named Chairman CARRIED OTHER BUSINESS 13 REPORT OF EXECUTIVE MEETING #23/83(SPECIAL) Res #373 Moved by W G Barber Seconded by E A Ful ton THAT Report #23/83 of the Executive Committee be received CARRIED Res #374 Moved by Mrs L Hancey Seconded by M W H Biggar THAT the Chairman be requested to contact the other members of the Policy Steering Committee on the Review of the Organizatlon and Mandate of the M T R C A , and request their approval for the draft report and Executive recommendations to be made available to the members of the Authority at its Annual Meeting on February 17, 1984 CARRIED 14 Res #375 Moved by E V Kolb Seconded by W G Barber THAT Mr Scott Macpherson be thanked for his contribution to the Authority over the past seven years, and that the good wishes of the members be extended to him in his future endeavours CARRIED Mr Macpherson expressed appreclatlon of his association with the Authority and the Executive Committee, and especially for the leadership of Mrs Gell as Chairman 15 TERMINATION On motion, the meetlng was terminated at 11 55 am, January 25, 1984 Florence E Ge11 W E Jones Chairman Secretary-Treasurer KC B-5l7 SCHEDULE "A. II STAFF PROGRESS REPORT Prooe'l:ty and Administration Section . . During the period October 1, 1983 to December 31:, 1983, the staff completed the acquistion of 22 new properties containing 29 468 acres The tota 1 acreage of lands owned by the Authority, as of December 31,1983 is 27,876 147 . . SUMMARY of 1983 ACTIVITIES of the PROPERTY and ADMINIST~ATION SECTION of the EINANCE and ADMINISTRATION DIVISION - completion of 79 property transactions containing a total of 430 796 acres. Activities under this category mainly related to the acquisition of property rights necessary to facilitate Authority Flood Control construction in the Humber River Watershed at Bolton and Palgrave; Erosion Control Works in the vicinities of Humbe~vale Boulev?rd, Beaucourt Road and Delroy Drive in the Mimico Creek watershed; and Azalea Court in the Humber River Watershed; as well as Shoreline Management construction along Lake Ontario in the areas of Fallingbrook Drive and Lakehurst Crescent Flood plain, valley and lakefront properties were also acquired at various locations under the Land Acquisition 82-84 and Lake Ontario Waterfront Projects - management, 3dministration and 9rocessing of assessment, real ty tax and insur3nce matters pertaining to 1,943 Authority-owned properties, Authority buildings and equipment, including preparation of appeals and negotiation and completion of settlements . - carrying out management and administration involved in all property arrangements pertaining to Au tho r Lty-owned lands including - 147 Rental Arrangements involving residences, farmlands, apairy sites and other uses compatible wi th the objectives of the Authority - licences, leases and management agreements with Municipalities and other public bodies. - sales and conveyance of easement rights for roads, sewers and other publ.c purposes - the Deed plot mapping of all Autho~ity-owned prol?erties, commenced in early 1983 with assisstance from the C 0 E 0 Program, is now complete for all watersheds except the Humber It is antlcipated that this i?roject ,..ill be fully coml?leted during 1984 - i?roperty files and records on older matters were consolidated and re-aligned A pilot i?roJect of Microfilming property records which must be retained on a permanent basis is underway - the section also carried out all administration and support services in connection with the maintenance of the Mministration Headquarters, pri~ting, mailing, office equipment and supplies Streamlining of services in the print and mail room and upgrading of the interior of the administration building were carried out during 1983 A breakdown of the properties and acreages acquired by the Authority to date is as follows B-518 - 2 - ETOBICOKE CREEK WATERSHED Flood Control and Water Conservation Total to date-- 67 properties acquired containing 451 734 acres; Conservation Area Total to date--IO properties acquired containing 418 170 acres; Total of Watershed 77 properties acquired containing 869 904 acres MIM1CO CREEK WATERSHED . Flood Cont.rol and Water Conservation - 9 properties settled during period containing 2 586 acres; - 9 purchases Mimico Creek Flood Plain Lands - D M Egles Property, - Estate of F Richardson Property, - E and A Riss Property , - F and F Degg Property, - J and L Borland Property, - M Snyder Property, - N Martin Property, - J Barr Property, all located at the rear of numbers 12-30 Beaucourt Road, City of Etobicoke - Ontario Hydro Property, located south of Bloor Street, west of Royal York Road, in the City of Etobicoke Total to date--58 properties acquired containing 94 542 acres; - 2 expropriations outstanding (permanent easement) Total Watershed 58 properties acquired containing 94 542 acres HUMBER RIVER WATERSHED Flood Control and Water Conservation - 3 properties settled during period containing 5 168 acres; - 3 purchases - Humber River Flood Plain Lands - Town of Vaughan Property, located on the south side of Highway #7, west of Kipling avenue, Town of Vaughan - Town of Caledon Property, located between Humber Lea Road and Queen Street, in the Bolton area, Town of Caledon - Finery Investments Limited Property, located west of Indian Line, north of Darcel Avenue, (Finch Avenue Extension) in the Claireville Area, City of Mississa'uga -1 property sale during period comprising 0 146 acres; - Sale to the City of Etobicoke for construction of a sidewalk (0 146) acres 3-519 - 3 - HUMBER RIVER WATERSHED cont'd Claireville Dam and a<:ser'loir Lands - 1 property sale during period co~prising 9 110 acres; - - Sale to the Ministry of Government Services for re-construction of .. Highway *50 north of Steeles Avenue Total to date--804 properties acquired containing 8,579 213 acres; Conservation Areas Total to date--79 properties acquired containing 4,305 773 acres; E'orest and Wildlife Areas Total to dat~--10 properties acquired containing 736 486 acres; Agreement Forest Lands Total to date--23 properties acquired containing 1,365.745 acres; ;Hagara Escarpment Lands Total to date--4 properties acquired containing 251 926 acres; Total of Watershed 920 pro1?erties acquired containing 15,789 143 acre~ DON RIVER WATERSHED Flood Contrdl and Water Conservation Total to date--19l ~roperties acquired contiining 1,955.137 acres - 4 ex!,ropriations outstanding (1 permanent easement) Conser'"ation Area Total ~o data--l property acquired contai,ing 9 350 acres; Tota!. of Natershed 192 properties acquired containir.g 1,964 487 acres HIGHLAND CREEK WATSRSHED Flood Control and Water Conservation . - 2 properties settled during period containing 3 267 acres; - 2 purchases Highland Creek Flood Plain Lands - City of Scarborough Property, located south of Sheppard Avenue East, west of Lapsley Road, City of Scarborough - M Miller Property, located on the south side of Lawrence Avenue, 'Nest of Centennial Road, City of Scarborough - 1 ?roperty sale during period comprising 2 648 acres; - Sale to the City of Scarborough for road construction purposes (2 648 acres) ; Total to date--145 properties acquired containing 824 530 acres; 8-520 - 4 - HIGHLAND CREEK WATERSHED cont'd Conservation Area Total to date--2 properties acquired containing 118 626 acres; Total of Watershed 147 properties acquired containing 943 156 acres ROUGE RIVER WATERSHED Flood Control and Water Conservation - 1 property settled during period containing 9 435 acres; - 1 purchase - Rouge River Flood Plain Lands - Municipality of Metropolitan Toronto Property, located on the east and west sides of Kirkham's Road, between Sheppard Avenue and Finch Avenue, City of Scarborough Total to date--122 properties acquired containing 2,098 774 acres; Conservation Area Total to date--2 properties acquired containing 267 038 acres; Total of Watershed 124 properties acquired containing 2,365 812 acres DUFFIN'S CREEK WATERSHED Flood Control and Water Conservation Total to date--90 properties acquired containing 905 423 acres; Conservation Area Total to date--19 properties acquired containing 1,076 568 acres; Forest and Wildlife Area Total to date--16 properties acquired containing 1,749 696 acres; Agreement Forest Lands Total to date--l property acquired containing 93 000 acres; Total of Watershed 126 properties acquired containing 3,824 687 acres PETTICOAT CREEK WATERSHED Flood Control and Water Conservation Total to date--l oroperty acquired containing 22 139 acres; B-521 - 5 - PETTICOAT CREEK WATERSHED cont'd Conservation Area Total to date--l property acquired containing 177 918 acres; - - - Total of Watershed 2 properties acquired containing 200 057 acres LAKE ONTARIO WATERFRONT Waterfront P!an - 7 properties settled during period containing 9 012 acres; - 7 purchases; -Pickering/Ajax Sector - Corporation of Town of Ajax Property, being Cherry Road, located west of Shoal Point Road in the Pickering Beach area, Town of Ajax - Scarborouqh Sector - Doverhold Invest~ents Li~ited Property, ~ocated on the east side of Livingston Road, south of Sylvan Avenue, City of Scarborough. - I Bayley Property - W Renwick Property - G w: McKague ?roperty - F S. Duckworth Property - ~ L Morris Property, all located south of Fallingbrook Drive, in the . general vicinity 9f Victoria Park Avenue and Queen Street East, City of Scarborough. Total to date--2S8 properties acquired containing 1;774 929 acres Conservation Area Total to date--9 9roperties acquired containing 49 430 acres; Total of Lake Ontario Waterfront 297 properties acquired containing 1,824 359 acres . SUMMARY FLOOD CONTROL AND WATER CONSERVATION October 1 - December 31, 1983 - 15 properties settled containing 20 456 acres; (-15 purchases;) - 3 property sales Total to date--l,478 properties acquired containing 14,931 492 acres; - 5 expropriations outscanding - B-522 - 6 - Summary cont'd CONSERVATION AREA October 1 - December 31, 1983 Total to date--123 properties acquired containing 6,422 873 acres FOREST AND WILDLIFE AREAS October 1 - December 31, 1983 Total to date--26 properties acquired containing 2,536 182 acres AGREEMENT FOREST LANDS October 1 - December 31, 1983 Total to date--24 properties acquire~ containing 1,958 745 acres NIAGARA ESCARPMENT October 1 - December 31, 1983 Total to date--4 properties acquired containing 251 926 acres WATERFRONT PLAN October 1 - December 31.1983 - 7 properties settled containing 9 012 acres; (- 7 purchases) Total to date--288 properties acquired containing 1,774 929 acres GRAND TOTAL OF ALL PROJECTS October 1 - December 31, 1983 - 22 r;>roperties settled containing 29 468 acres (- 22 purchases) - 3 property sales Total to date--l,943 properties acquired containing 27,876 147 acres; (11,281 477 hectares) - 6 expropriations outstanding 1984 01 12 DO/am 6-523 TO THE CHAIRMA~ AND MEMBERS OF THE EXECJTIVE COMMITTEE, M T R C A - Mtg 111/84 FRO"! 11R J C MATHER, ~DMINISTRATOR - ~ATER RESOURCE DIVISION RE WATER RESOURCE DIVISION PROGRESS REPORT OCTOBER 1, 1983 TO DECEMBER 31, 1983 The attached progress report is presenced for the periOd October 1 , 1983 to December 31, 1Q8'3 The report details both the physical and financial progress of the various programs and projects in the Flood Control and the Wacerfront Sections Uso included is a status report on the Fill Violations as prepared by the Development Control Section Attachments 1994 01 16 , JCM/ fs . - to IJi"l.I<I.,lliiG 5T,\TEI'lt::N r PAGE 1 I Ul BY PIWGllMI "t.ld;'l.' eNDING 8.31<..31 REP 109 N ",. E XP[I~O r T U fl F S REV E N U E .. - --'" -~. --- .~~..- --~- .~_.- "- .... . '_"_ _ ..._'_____ _ . _ __.___4__ ;:;:. =-=:":'::::1:=:::: = :.~=:::: c:==; = === ::== == = =.;.:1== ='=-=::::::.:= = = ---.--------..--.. ...-."---- .-- -_.----------_.----- --------- li-T-D ')-T 0 :~ FUtWS /'I-T-O Y-T-D /. BUDCET ACTlIliL I\CTUAL EXP AVAILABLE BUlJGET ACTUAL ACTUAL RECD --.-- -- --------- - - - -- --- - -------.-- ---.--.. ------ ------- ---- ------ ------ --.---- --------- ------ ------ ------- WATER IlESOlJl,' E - 1'1 nOD CIlNi/WL ~==~~==-~===~~--~~~~=~~~~~=~==~ ADi'll NI STRATI ml FLnUIJ cnNTRUL 7LJ3,652 ,'>I, Ul1 /-'0, 5 ~')8 103 6 26 906- 743,652 16,288- 2 2 METRO - EIWS ION CONTROL 396,500 101,354 381, 131 96 1 15,369 396, 500 3,400- 39,422- 9 9 YOfm - EHOSIW4 \,OI'UiWL 23, 500 10,375 44 2 13, 125 23, 500 1,400- 6 0 " PEEL - EHosrUN CON1HOL 35,600 1 -', 272 17,316 48 6 18,284 35,600 0 DURHAI'I - EfW[.IlIN CONTROL 5,000 0 :),000 5,000 0 PLANNING AND ~EN~DI~ l'IEAGUfH: 1, 343, 500 1 E17, 437 1 315,613 97 9 27,887 !' 343, 500 608,472- 734,491- 50l 7 , RIVER FOREC~STING, OP ~< 1'11\11'1 IJ9,637 '.1,409 10ti, 892 88 5 13,745 119,637 0 S~lALL DA~lS, Clli.l'~ ~, ER cnNT 244 000 11, 265 25"! 111 103 3 8, 1 11- 244,000 0 ----------------..------------------------------------- --------------------------------------- TOTAL 2,911,389 .kr ,7,18 2, 85~l '194 98 0 58,395 2,911,389 611,872- 791, 600- 27 2 .---------------.---------------------------------------- --------------------------------------- ENCUI'IBERANCE S MIl:: NOT I NCLUloED 1 N THE ACTUAl lIH.i or\ I 11,11; :.i I t\ 't:'I"It'rH P,),}!:: 2 y PI~OCl<Al'1 l'I~lllllli HillINO t!~H...!.J1 nEP 109 f. X P I rJ U I 'I II It l: S REV E N U E . -- . . ... .. - ~ - -~.__._- -- --.. -.-, . - .., - - .... .. - -.- ~~;~~~~~~~;;=~~;=~~~~;=~~~~~;~~===~~~~=~ - ---- --- ~----. - -..----.------..-- h,..r 0 \ r I) ,; f lIHOfi H'-T-D Y-r-o I. iHlDOEJ j',\. flh\L hi' 111t\1 EXP AVAll-t'UU: 1I110GfT ACTUAL ACTUAL HEeD - -.--- .--.--- - , .-.-- --- _':":;":::':'=~.o-;"";' ;;...;:...:,.;;::. g-;:;;::;.:~ =--=W1:;;J;;';:'; :;.:~~~ 1/\ 1 ElC HH'i(oll'h I - II'; H.BflCUNl ;..:~..._.:...:..::_._...:... _1__.. ~_ ..;;.._ ---... ,l),'IINHiTRAllCiN IIAH:."FflUtH <.:J 1, ';!~N ,-!tJ,O.::U "- -1/, 20iJ 117 1 ::U" U 41 2 J L 239 3:)1- 2 . A" 1 'I AL Pt=:v.:.....)? "llit! .. J, ::l:JI, 261 I 1.1.4'1-'1 J, 167, '/U:! /6, :3 363, 2 r'l 1. 531.261 2, r/l30- :)2, I~O- 3, '1 ,JIOHEL WI: I'IANAGt:;I"UH ~U2.::l00 2 Ii, -104 '11/, /:J3 II 7 16",74/ 5132.~OO 0 IAIN"IENtINC!:: 0 2,3613- 2,366- 0 IJ I ---- ---. ----- --- --- -_. -.... --. - - --------- -- -- --- _______________________M_______________ fffAI- 2,325.000 :j~I;~, 9:26 1" U~jj, 01'1 78 f) "91 9UQ C!,325.00\) 5,34B- 501.869- 2, '1 . _.-.__.._--.~ -- - - -.----.,.- - - ._ _ ___._______~..__._ __M...._~._._ ..--- -------...... ------- ------------ ---...--- ,',jl,lIt1Ut.:'llMlCt: S MlL Nrff 1 NCLl/Ll1: U IN THE AC'(UAI. 01 I UI N UI 8-526 - 1 - FLOOD CONTROL Erosion Control - Metro Major remedial works have been completed at the Wynford Heights Crescent site in the City of North York Private revenues in the amount of $~1,300 00 which were received this year but not included in the budget figure are reflected in the overall expenditure for this activity Major work at Beaucourt Road has been completed The majority of the work at Delroy Drive, on the Mimico Creek has been completed Final restoration and revegetation of the site is scheduled for the Spring of 1984 Erosion Control - Peel Erosion control work on the Humber River, adjacent to Glasgow Road in the Village of Bolton was completed Erosion Control - York Remedial works at Kirby Sideroad have been completed Private revenues in the amount of $',400 00 which were received this year but not included in the budget figure are reflected in the overall expenditures for this activity MAINTENANCE Major Maintenance Major repair work in the Lower Humber Channels has been completed The rehabilitation of the Palgrave Dam is now complete A comprehensive monitoring and structural investigation of the G Ross Lord Dam wa s carried out arfd a repor~ prep~red Regular main~nance of our water control structures has been carried out withIn the established budget guidelines PLANNING AND REMEDIAL MEASURES Remedial Works Channel improvement works have been in progress on the Main Branch of the Humber River in Bolton Work for the Phase I 0 f the Bol ton Project were completed in June of 1983 The remedial work contracted und er Ph a s e II of the Bol ton Proj ec t is now substantially complete, although restoration around the King Street bridge be required in the Spring of 1984 Also release of the holdback monies will be due early in 1984 Erosion control remedial works have been initiated on the Highland Creek as outlined in the Highland Creek Project '9~'1 Work on the two sites identified for 199~, has been completed Keating Channel Study The Keating Channel Environmental Assessment report has been formally subm it ted to the Ministry of the Environment for their review. Environmental Planning Collection of background data for input into Master Drainage Planning is ongoing The land use map has been updated to reflect 1983 status A detailed examination of flood susceptible areas is underway Field studies are completed for the Environmental Inventories for the erosion control program Reports will be drafted in the near fu t u I" e /2. . - B-527 - 2 - WATSRFRONT ---------- ---------- Colonel Samuel Smith Waterfront Area - Landfilling continued over the period with the result that 3 75 hectares of land have now been created - The winter landfilling program has been approved - The number of names on the waiting list for moorings now totals 140, an increase of 7 over the reporting periud - The City of Etobicoke, Humber College and the Ministry of Government Services are all involved in a planning review of the future of the Lakeshore Psychiatric Hospital - Detailed planning of the final park layout is continuing in conjunction with Metro Parks Department and Humber College - Acquisition of the Provincial Crown Waterlot is proceeding , Humber Bay West - Mimico Cruising Club has started construction of its clubhouse - Etobicoke Yacht Club has approved plans for a c~ubhouse with construction anticipated in 1994 - A master plan amendment to increase the mooring capacity from 500 boats to 700 boats has been approved by Metropolitan Toronto and forwarded to Etobicoke for consideration ~estern Beaches - The final design study for the hydraulic improvement at the mouth of the Humber River is underway with construction planned for 19~4 if funding is made available through ~etropolitan Toronto's Waterfront Pollution Committee - Staff is assisting the ~inistry of Snvironment and the Waterfront Pollution Committee in deter~ining an appropriate programme of remedial measures to reduce waterfront pollution ~quatlc Park - T,e legal surveys delineating the vario~s property transactions have been register~d and the applications for transfer of provincial Crown Lands have been filed - Background studies required for the Aquatic Park Planning Task Force are continuing in preparation for the next meeting planned for early in the new year - Landfilling operations at the end of the endi~ement have concluded for the winter and fill material is now being used to complete the closure arms of Cell 3 Ashbridge's Bay - The detailed planning of dredging works required for 19~4 is underway in conjunction with Metro Works Department and the Toronto Harbour Commissioners /3 . B-528 - 3 - Bluffers Toplands - The paving ~ontract at the Fishleigh Filtration Plant site is completed - The el ec tr ic al design and contract specification for site lighting has been completed - The landscaping of the site was substantially completed with only minor grading and seeding to be finished in 1984 - Plans are being reviewed for the proposed development of the former Seminary lands in an effort to address some of the concerns of local residents East Point Park - Detailed planning of the road alignment and parking lot locations as well as the stream and pond system is und er review Tn addition, the details of electrical supply and sanitary sewers are being planned - Metropolitan Toronto Parks and Property Department has identified interest in developing the playing field complex as a Metropol i tan facility so there wi 11 be some delay in the planning of these facilities while Scarborough and Metro review this po s sib il it Y Ajax Waterfront - Deta iled planning of works to be implemented by M T R C A , Town of Aj ax, the Rotary Club and Wimpey Construction is underway Shoreline Management - The first phase of shoreline protection for the Fallingbrook Dr i v e area of Scarborough was completed - The shoreline protection work proposed for South Marine Dr i v e wa s stalled due to delays in issuance of the exemption und er The Environmental Assessment Act However the access road from the Guild Inn was completed and some materials were stockpiled - Property negotiations are continuing in preparation for shoreline protection along Springbank Av en ue and Lakehurst Crescent - A Project for Erosion Control in Bellamy Ravine was adopted by the Authority and rletropol i tan Toronto Funding arrangements are now under consideration by the City of Scarborough and the Ministry of Natural Resources . - The Authority was retained by the City of Scarborough to implement emergency shoreline protection works to protect a sanitary sewer near Lakehurst Crescent which was endangered by erosion C 0 E D Program This program was very beneficial in a number of areas where crews were able to complete various landscaping projects and al so participated in erOSlon control work on Scarborough Bl u f f s In particular the Program was used to supplement landscaping at Bluffers Park, Fishleigh Fil tration Plant, Humber Bay and Ajax t\l so , staff employed und er the program assisted in erosion control works at Fishleigh Dr i v e and South Marine Drive /4 - 8-529 - 4 - Snvironmental Monitoring - The 1982 Waterfront Monitoring Program report is complete in draft form and will be finalized early in the new year - Automatic temperature recorders were changed in November and will remain in place until Spring 1984 - The 1983 program is complet~ - The 1983 field program at Colonel Samuel Smith Waterfront Area is complete Discussions with the Ministry of the Environment on sample procedures for 1984 are complete and changes will be incorporated into the Agreement - A request for exemption to The Environmental Assessment Act for the South Marine Drive stabilization project was prepared and submitted to the Minister, Ministry of the 'Environment The Advisory Committee will report to the Minister by January 16, 1984 , 1984 01 12 BED/SH/md . /5. OJ I U1 w 'IO THE 0iAIIWAN AND MEMBERS OF THE EXEnJTIVE <XJ.Mr.mEE, M. T. R.C .A., - II 23/83 PAGE I 0 F'RCM: JOHN W. MALEl'ICH, MANlIGER, DE.VI::I.DPMENl' a::Nl'ROL SEX:TICN. RE Ar:MlNISTRATIOO OF OO'I7\RIO REXiUIATICN 170 - OCTOBER, NOVEMBER AND DECEMBER, 1983 LOCATION DETAILS OF VIOLATION NOTICE Em'. OFF: INITIALS ACTION TAKEN Town of Ajax V-529, Douglas & Kathleen C1uthe -Filling stopped North Part Lot 12, Concession 3 October 21, 1983 DW -Working with staff on restoration South side Taunton Rd (4th Concession Rd ) 3(b) between Church St and Rotherglen Rd V-530, Region of Durham, Duffin Creek Watershed Works Department October 21, 1983 3(b) TOWil of Pickering V-531, Robert & Edna Crosier -Filling stopped Part Lot 8, Plan 270 November 8, 1983 DW -llorking with staff on restoration. West of West Shore Blvd 3(b) #501 Park Crescent I Waterfront U1 , I Town of Markham V-532, Mr William Rinas -Activity stopped I Part Lot 30, Con 5 November 8, 1983 DW -Working with staff on restoration. South side 19th Avenue between 3(c) Warden Avenue and Kennedy Road Rouge River Watershed Town of Vaughan V-533, Swinton \lomes -All fill removed Rear of Lots 75,76,77, Plan 65M-2154 November 23, 1983 DM -Area shaped and sodded to the satisfaction Nos 17, 19 & 21 Sundown Court 3(b) of our staff and Town of Vaughan Don River Watershed City of Brampton V-534, Ercole & Vittoria D'Amario Lot 41, Plan M-350 November 28, 1983 AW -Discussions regarding site restoration Cynthia Cres , 3(c) are underway Humber River Watershed fL. 1984 01 06 PAGE II '10: THE rnAIRMAN J\ND MEMBERS OF TIlE EXECUfIVE ca'lHTITEE, M.T.R.C.A.. - t 23/83 FRl>1: JOlIN W WILEl'ICH, MANAGER, DEVl::u:)pNUll' c.G11M:lL sa:-fIOO. RE: J\D1INISTRATIOO OF rnI2\RIO RlnJLATIOO 170 - OCTUBER, NOV~WEK AND DEC~rnEK, 1983 LOCATION DETAILS OF VIOLATION NOTICE ENE'. OFf: ACTION TAKEN INITJALCi Town of Caledon V-535, Lauren & John Johnston -All activity has stopped. EaSl side of tlwy USO DtlceUlber 5, 1983 All -o~ler will apply for a permit prior Part of Lot 3, Con 7 (Bolton) 3(c) to pursuing auy further work lIumber River Water..hed Town of Pickering V-536, WllliaUl K Cherry -Filling stopped. South Part Lot 13, Concession 7 ~ceUlber 20, 1983 OIl -Letter sent to TOWIl of PIckering ~or~h of 7th Concetlsion Road 3(b) re dumping without approval I West side of Sideline No 12 Duffln Creek Watershed en I fL. to 1984 01 06 I Ul w I--' B-532 TO The Chairman and Members of the Executive Committee - M.T R C A Wednesday, January 25, 1984 FROM T 1': Barber, Administrator, Information and E~ucation Division RE INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT October 1 - December 31, 1983 CONSERVATION INFORMATION SECTION The Conservation Information Section carries out the Authority's general information program, as well as programs relating to the resource management activities and tRe marketing of the Authority's revenue generating facilities - Black Creek Pioneer Village, the Kortright Centre for Conservation and the Conserv~tion Areas, in addition to the marketing/ communications enhancement program funded by the Canada/Ontario Employment Development Program COMMUNITY RELATIONS - INFORMATION - GENERAL Printing Highlights - staff members continued distribution of the Authority General Brochure and the 1983 Calendar of Events and Activities, as well as promotional brochures on the Conservation Areas, Black Creek Pioneer Village and the Kortright Centre for Conservation - printing of the 1984 Calendar of Events and Activities (Winter and Spring) and some distribution - printing of 250,000 copies of the updated Authority General Brochure - considerable work went into the preparation for printing of the 1983 Annual Report, including a new watershed map - printing of invitations, programs, etc , for the Official Opening of the Bolton Flood Control Channel and the Ceremonial Sod-Turning for the Black Creek Pioneer Village Visitors Centre Tours and Special Days - staff made arrangements for a) the Official Opening of the Bolton Flood Control Channel, by Jack Johnson, M P P , Wellington-Dufferin-Peel, on Friday, October 14, 1983 b) the Ceremonial Sod-Turning for the Black Creek Pionee~ Village Visitors Centre, by The Honourable Susan Fish, Minister of Citizenship and Culture, on >,Iednesday, November 2, Ig83 c) a special Media Tour, "Preparations for Christmas, Pre-Confederation Style", on Wednesday, November 30, 1983 d) the Twenty-Seventh Annual Authority Dinner, on Sunday, December 4, 1983, at the Boyd Conservation Field Centre AudiO-Visual Highlights - staff prepared an audio-visual presentation on the 19R4 Budget, for a number of presentations COM~UNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT Printing Highlights - reprinting and distribution of the Valley and Stream qegulations and the Waterfront Regulations (French and English) - translation, printing and distribution of the Italian version of the Valley and Stream Regulations B-533 - 2 - Audio-Visual Highlights - staff prepared an exhibit on watershed planning tha t \~as used by the Ministry of Natural Resources until early December. COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING Printing Highlights - distribution continued during this period of the Black Creek Pioneer Village Brochure, Conservation Area Map, Calendar of Events and Activities, Wintertime Good Times Brochure, Authority General Brochure, flyers on all different programs, and posters. This was carried out by C O.E.D staff. - the posters promoting Black Creek, Kortright and the Conservation Areas have ;lroven to be very popular, as distribution continues throughout the watershed The Kortright poster was recently displayed in the Liquor Control 80ard of Ontario outlets in the region. - Brochures Unlimited continues to distribute the Black Creek, Kortright and Conservation Area Brochures in the Metro region, and throughout the Niagara Peninsula in the case of the Black Creek and Kortright Brochures - staff ;lrepared and distributed 19 news releases, 7 photo releases, 13 synopses and 10 flyers, identifying and l;lromoting programs at the Village, Kortright and the Conservation Areas, as well as 2 special ['rofiles on Black Creek and Kortright staff and 1 Kortright newsletter - the Authority subscribes to the MacLean Hunter Press Cli;lping Service and, for this ['eriod, recei '!ed approximately 780 press clips, which is only a sample of the coverage the Authority receives Special Programs - a considerable amount of work went into the communications component of the 1984 Marketing Plan In addition, a number of meetings were held to ~rovide a great oeal of input into all aspects of the Authority's marketing activities carried out by t!1e three operating Divisions - staff attends regular ~eetings of t!1e Attractions Council of the Metro;lolitan Toronto Convention and Visi tors Association, as '>lell as t!1e Executive ~eetings - considerable work and olanning went into develol;ling the Visitors Survey The summer portion of the survey '>las completed and the material was keY-;lunched by staff - the teleohone answering sales program on weekends and holidays continued to be very successful - material is being continually u;ldated and sup;llied to Infomart for the l'eleguide units - the word processing equipment continues to be used to enhance the marketing of our facilities and programs. Audio-Visual Highlights - Ninter television promotions were sent to all the Southern Ontario television stations, promoting Black Creek, Kortright and the Conservation Areas - arrangements were made and exhibits were set up at - Sh09;ler's World (Albion) - Bramalea City Centre - Eaton Centre (t'>lice) - Nes t'>lOOO Mall - Cloverdale Mall - Dixie Plaza. ~dvertising and Promotion - arranged for special publici ty features '>li th a) ~etropolitan Toronto Convention and Visitors Ass~ciation - Discovery Guide, J!..ttractions and Happenings (bi-monthly) B-534 - 3 - b) Canada Century Home c) Around Canada's Wonderland d) Ontario Ski Map e) Outdoor Canada Magazine - brochures have been distributed at Ontario Ski Shows and exhibits, as per an agreement with the Ontario Ski Counc il Canada/Ontario Employment Development Program This program has made a substantial contribution to the information communications effort of the Authority Em[?loyees have been carrying out an extensive Visitors Survey at all of the Authori ty' s facilities The Summer survey was completed in September and this was followed by two months of data [?rocessing to organize the material The Winter survey has commenced Staff time has also been spent on distributing literature, [)osters and flyers, throughout the watershed, [?romoting the Authority's [?rograms and facilities Program staff members have also been assisting with the telephone answering service. , CONSERVATION EDUCATION SECTION The final quarter of 1983 saw the Authority's education programs achieve most of their objectives and even go beyond Residential Programs - the residential Field Centres were able to maintain the 90% yearly average occupancy level during this final quarter, despite declining enrollments, ri sing transportation costs and in some cases, extensive renovations; - in add i tion to the regular groups of junior, intermediate and senior level students using the Centres, some of the special user groups included the Cathy Morris Workshop, North York Board of Education Visual Arts Teacher Workshop, 666th Air Cadet Squadron, Residential ~ehabilitation Society, Junior Farmers' Association, Ontario College, Toronto Montessori School, St Jeromes College, Trainable Mentally Retarded, a private family group, the Conservation Authority Executive Christmas Dinner and several in-house committee meetings - The C 0 E D programs of construction and renovation at Albion Hills and Lake St George Field Centres continue on target ~lready completed at Albion Hills is the total renovation of the dormitory washrooms, including modernization and wheel-chair access, the complete renovation of all dormer '>lindows (including frames and glass) , the painting and staining of all exterior walls, the gutting of both the boys and girls domitories and the i r renovation partially completed Already eompleted at Lake St George is extensive landscaping and grounds maintenance, restoration of the horse barn, exterior staining and interior painting of both dormitories, construction of a waterfront component including docks, boathouse, and campfire pit, addition of interlocking patio and pathways for the clormitories and the commencement of a major extension to the pantry Lease Agreement between the Metrooolitan Toronto and Region Conservation Authorlty and the Board of EducatIon for the City of Etoblcoke - the construction of the Etobicoke Environmental Education Field Centre is well under way with the work presently concentrated on the interior Completion dat~ is sti 11 set for early March, 1984 The Advisory Committee have met and are oresently working on a final budget for 19A4 The contract for the construction of a mud rool'l/foyer has been awarded and the kitchen renovations will be done in February 1984 B-535 - 4 - Kortright Centre for Conservation - the 1983 attendance figures at the Centre show 72 ,500 visitors, down somewhat from the 1982 attendance figure of 77 ,000; the projected figure for 1983 was 90,000, the figure of 72,500 includes over 29,000 students participating in a specialized education program - dud ng this final quarter there were a wide variety of programs, attractive to all ages and interests, including In Pursui t of Natural Trivia, Myths and Magic of the Forests, Hurricane Hazel Remembered, Bird Feeder Worksho~, Sawmill Tours, We're for the Birds and Christmas in the Coun try. - special Saturday programs i nvol ved large numbers of Girl Guides, Brownies, Boy Scouts and Beavers; as well there were teachers' workshops, a staff training day and various receptions and conferencesl meetings. - during this quarter, artists in residence were Marc Barrie, Laurel Campbell Stark, Bill Ivy and Ken Strasser. - thanks to a variety of Government sponsored labour-intense programs and funds raised by the Foundation and from various Ministries, several development projects were completed in 1983 - Marsh Viewing Facilities, 1?orestry Trail, !:lhase II of the Land Theme Building, !:'isheries Project and the Water Theme related mosaic - the Fish and Wildlife Theme programs have been very 90pular with visito):s; preliminary discussions have been held to expand the Wa~er Theme ~rograms to include oarticioation from the Ministrv of the Environment; a 2 year extension of the Renewable Energy Theme Program is in the final stages of discussion; preliminary discussions are presently underway to establish both a Land Theme Program and a F~restry Theme Program. - The construction of the Woodland Pavilion (part of the Centre Core Plan) has commenced, as part of the C.O.E D. project. Day Proqrams - the day ?rograms at both Cold Creek Conservation Area and Black Creek Pioneer Village, continue to he fully supported by the Boa rd s of Education with the usual age and grade range of participants; 1,10ck bookings continue at Cold Creek through the Metro Separate School '3oard and the Toronto Board and at Black Creek through the Metro Separate School Board and the Scarborough eoard - some of the special programs at ~lack ~reek included the "Trip in Time" program with York University; this program will be expanding even more next year and several very successful Teachers' Worksh09s \t Cold Creek there was the add i tion of a new program entitled, "Firearm Safety and Shooting Skills" Tot'al attendance for all education programs in 1983 was 151,250. B-536 TO The Chairman and Members of the Executive Committee, ~ T R C A FROM T E Barber, Administrator Information and Education Division RE FINANCIAL PROGRESS REPORT 1983 -- PROGRAM ADMINISTRATION BUDGET ACTUAL SURPLUS $415,370 $392,133 + $23,237 COMMUNITY RELATIONS INFORMATION BUDGET ACTUAL $181,370 $178,233 + $ 3,137 COMMUNITY RELATIONS EDUCATION BUDGET EXPENDITURE ACTUAL EXPENDITURE $1,715,083 $1,620,076 + $ 3,165 BUDGET REVENUE ACTUAL REVENUE $1,401,150 $1,343,597 COMMUNITY RELATIONS EDUCATION B C P V BUDGET EXPENDITURE ACTUAL EXPENDITURE $157,500 $129,440 + $16,931* BUDGET REVENUE ACTUAL REVENUE $163,500 $152,371 DEVELOPMENT BUDGET ACTUAL N/A $114,800 $ 40,901 Overall Surplus $ 45,470 * included in Historic Sites Budget Financial Comments 1 A surplus of 23,237 in program administration was produced by an under expenditure on benefits, a maternity leave and unexpended funds for a computer reservation system 2 Reduced expenditures and a corresponding reduction of revenue in the conservation education program resulted from a new staffing formula in the Conservation Field Centres 3 The Black Creek Pioneer Village Education Programs produced a surplus of $16,931 partly as a result of the volunteer program and donated materials 4 The Development budget is expended as funding is available from the M T R C F Some $62,000 for an audio trail system will be available in the first half of 1984 and a road at Albion Hills Conservation Field Centre was not required as a result of relocation of the Etobicoke Centre 1984 01 25 TEB/P 8-537 To The Chairman and Members of the Executive Committee, M T R C A. From Mr R K Cooper, Administrator, Historical Sites Division Re Progress Report - October 1 to December 31, 1983 HISTORICAL SITES PROJECTS (Development) Construction on the Visitors Centre is about 3 weeks behind schedule The Tinsmith/Hardware Store has been erected and work is progress- ing on completing the structure. Landscaping around the Nesbitt Sawmill has been started HISTORICAL SITES PROJECTS (Operations & Maintenance) (a) Registration and Artifacts To date, during the last quarter of 1983, 11 donors have given approximately 100 items to Black Creek, including textiles, tools, an upright piano, a music stand, a table, an early flax wheel, two oil paint- ings, an 1850 pine cradle and a handmade bedspread (b) Publicity and Promotion During the final quarter of 1983 considerable progress was made towards working to increase visitation to Black Creek through promotion to community groups and via the media To ensure the success of one of our new programs for fall, "Celebrate The Apple Harvest", Village staff prepared an assortment of foods made with apples and packaged them in a basket wrapped in cloth Later they were delivered in person by Lorraine O'Byrne and Neil Beaudry to several Toronto media personalities The benefits from this endeavour were realized almost immediately, as radio stations CFRB, CHFI, CKEY and CBC provided excellQnt free coverage of the event the following morning On Sunday, October 16, Mel Lastman, Mayor of the City of North York, and his wife Marilyn, CBC television hostess Barbara McLeod, and CFTO reporter Glen Cochrane were on hand for the Village's first ever "Celebrity Bake Off", held in the Town Hall Joining them as their culinary coach was well-known cooking school director, author and radio personality, CFRB Etta Sawyer This part of the day's program provided a superabundance of enter- tainment for the large crowd who jammed the Town Hall to view the antics and, to a lesser degree, skill of the participants Among the captive audience were cameramen from CBC and CITY-TV who filmed segments of the event for broadcast later Another first on this same day was the "Home Baking With Apples Contest" Entry forms, contest rules and program flyers were distributed to most schools in the Metro region, Women's Institutes, 4-H Clubs in Peel, York and Durham regions, and to all Metro senior citizens' clubs and service clubs. Also, a special class was established for Village citizens. To keep costs to a minimum,. gain additional exposure for the event and, moreover, to cultivate future corporate sponsorships for the Village, support in the form of judges and prizes was Obtained from Canada Packers Ltd , Robin Hood Multifoods, General Mills of Canada, Toronto Life Magazine, Maple Leaf Mills, and Canadian Living Magazine Many important contacts were made for the Village on the day of the event Meetings have already been established with Robin Hood and Canadian Living Magazine to discuss sponsorship of special events during the Bicentennial year and the develop- ment of food related articles during 1984 respectively Canada Packers has agreed to be the sole sponsor of the baking competition next year Starting in January we will be meeting with them to discuss ways to further promote the event co-operatively Prior to the "Celebrity Bake Off" and "Home Baking With Apples Con- test", Lorraine O'Byrne was interviewed by CFRB radio to discuss Thanksgiv- ing and "Celebrate The Apple Harvest" After the event, the Toronto Star B-538 - 2 - newspaper provided excellent free coverage of the program by printing a full page of photos highlighting the activities offered at the Village during fall This year's "Pumpkin Party For Kids" was heavily promoted through the distribution of over 7,000 flyers to all Girl Guide and Brownie clubs in the Metro Toronto region, and to each child who visited the Village on an educational tour, in advance of the first weekend of the program Con- sequently over 600 children took part in the "Hobgoblins' Parade" on the final day of the event "DO-IT-YOURSELF" magazine published a feature article on the Village toy-maker in its November/December issue Arrangements have been made to provide them with stories over the next year "Christmas In The Village", the final event for 1983, received much attention from staff, the media and the Toronto community Following is a list of the variety of ways in which awareness of the program was communicated to the general public (i) A graphic artist was hired to prepare a new design for a flyer to promote the event emphasizing the many activities available for visitors in an improved, more authentic format Over 5,000 copies were distributed to all Toronto and area media, senior citizens clubs, day-care schools and recreat- ion centres in North York (ii) Lorraine O'Byrne and Jean Hayward appeared on CKVR television to discuss preparations for an early Ontario Christmas and the Percy Band Collection of 19th century toys (Dec 14th) Jeanne Hughes was interviewed on the CBC radio program "Fresh Air", and Neil Beaudry on CKO Radio to discuss Christmas activities at Black Creek Channel 47 and CFTO-TV filmed segments of the Christmas program, for broadcast to their viewing audiences during Christmas week (iii) Two Village interpreters participated in Harbourfront's special week- end program "Gifts and Decorations The Old-Fashioned Way", providing demon- strations of decoration-making to the visiting public, and information regarding our own Christmas program (iv) The Airport Skyline Hotel set up a special exhibit on traditional Christmas foods with much assistance from Margaret Hesp, Village registrar Several artifacts were rented to the hotel to be placed on exhibit, and brochures on the Village Christmas program were on hand for guests of the Skyline (v) A "Christmas In The Village" exhibit was placed in the Ontario Travel Kiosk - Toronto Eaton's Centre window Flyers were given to the travel counselling staff at the Centre, for distribution to the general public (vi) Members of the Toronto media were invited for a special tour of the Village as decorated for an early Ontario Christmas Over 30 of them responded to our invitation and were provided with a guided tour of the Village Photographs were provided for them to be used with any articles they developed (vii) Toronto Star Crafts columnist, Ankaret Dean, visited the Village to prepare an article on hand-made decorations featuring those on display in the Village homes The article appeared on Christmas Eve (viii) Good coverage of the "Christmas In The Village" program was provided in three consumer magazines 'En Route', 'Town and Country' , and 'Key To Toronto' In November CBC used the Village Blacksmith Shop as the location for segments of two productions One was with David Suzuki of "The Nature of Things", and the second with Jim White, Food Editor of Toronto Star, for "Market Place" CFRB held their 18th annual Christmas service and reception at Black Creek The service, taped at the Fisherville Church, was broadcast on Christmas Day Students from the Museum Technology course of Algonquin College, Ottawa, toured the Village and met with the Curator The Director of the Ukrainian Village, Edmonton, spent the day consulting with the Curator of Black Creek A director from the National Capital Commission was sent to - 3 - B-539 Black Creek to see the Mill and to discuss the principles of its operation and interpretation with Village staff Black Creek and the Ontario Historical Society hosted a seminar on nineteenth century Folklore at the Village Black Creek was also the location for the Tool Collectors meeting in October Village staff have been involved in the presentation of Ontario Historical Society workshops on the Bicentennial at Timmins, Milton and Otterville, Ontario Jeanne Hughes has spoken on the Village and Village programs to the Brampton Kiwanis, the members of the Upper Canada Miniature Workshops, the North Leaside Ladies Group, the Business and Professional Women's Group at Timothy Eaton Memorial Church, the Salvation Army, the Canadian Women's Historical Society, and the Parkdale Golden Foundation Mr Russell Cooper spoke at the 25th annual Christmas luncheon of the C W Jeffreys Chapter of the I O.D E. Artifacts from ~~e Village collection have been used once again on cac's "Reach For The Top" quiz The Village has also set up a special Christmas exhibit in the main lobby of the Skyline Hotel for the month of December (c) Program and Special Events From October 1 to December 31, 1983, the following ~pecial events were offered to visitors to Black Creek (i) October 1, 2, 8, 9, 15 and 16 - "Celebrate The Apple Harvest" This event had new components in 1983 and due to its success will be repeated next year (ii) October 22, 23, 29 and 30 - "Pumpkin' Party For Children" and "Hobgoblins' Parade" (O~tober 30 only) (iii) November 5, 6, 12 and 13 - "Crafts Festival" This event was another first-time event for the Village We were fortunate to have the participat- ion and support of twelve different artisans, each of whose speciality was old-t~e crafts Inclement weather conditions reduced the attendance during the days of the Festival However, it was a very appropriate e~ent for the Village and will be re-scheduled next year (iv) November 19 - December 31 - "Christmas In The Village" This year members from 14 different ,Church choirs have been involved in providing weekend carol singing at the Village Mr Reginald Twiselton co-ordinated the volunteer carollers, arranging for singers on every Saturday and Sunday before Christmas during the Christmas in the Village program For the second year, Mr Gordon Sillito, a teacher at Unionville Public School, and his students have volunteered on several weekends befare Christmas to bring the Dickson Hill School to life Nith the enthusiastic support of the school, its teachers and many parents, this group have con- tributed a truly excit~ng component to the Christmas program Students decorated the 1860's schoolhouse with handmade decorations, talked to the visitors, prepared and distributed C~ristmas goodies and spent some time working in other Village buildings as "apprentices" An application for a Bicentennial Programming grant, through Wintario, was submitted to the Ministry of Citizenship and Culture for their consideration If funding is awarded, it will be applied towards the cost of staging a two day Bicentennial Jubilee on June 9 and 10 Neil Beaudry visited the offices of Robin Hood Multifoods in late December to seek their assistance in the co-ordination of "Festival for Children" , a new special event planned for May The prospectus looks good as they are extremely interested in financing and conducting a series of home-baking activities for young children during the festival. More planning meetings are to be held over the next few months Masonic Lodge Foundation Stone Laying More than 1500 Masons from allover Ontario participated in a colourful ceremony to lay the Foundation stone of the Masonic Lodge and Tinsmith/Hardware Shop at Black Creek on Saturday, October 1 Grand Master of the ceremonies was Dr Ronald E Groshaw, who heads over 100,000 Free Masons in Ontario "- B-540 _ 4 _ Visitors Centre Sod Turning During a sod turning ceremony on November 2, 1983, the Honourable Susan Fish, Minister of Citizenship and Culture, presented the first installment of a $1 25 million Lottario grant, for the construction of the Black Creek Pioneer village Visitors Centre to Emil Kolb, Chairman of the Visitors Centre Sub-Committee, and Mrs Florence Gell, Chairman of The Metropolitan Toronto and Region Conservation Authority During the final quarter of 1983, 13 weddings, 12 wedding recepitons, 2 Church services and 20 banquets were held in the Village This brings the total number of weddings held in the Village in 1983 to 52, with 39 receptions held in the Half Way House dining room In addition, the restaurant also hosted 27 evening banquets during the year. The Dickson Hill School program continues to be fully booked In October, November and December, 11 classes attended The total number of students participating in this proglram in 1983 was higher than in 1982, indicating larger numbers of students per class The total number of citizens for 1983 was 401, compared to 409 in 1982 The COED Program awarded to Black Creek allowed for the hiring of 26 interpreters, 6 maintenance workers and 1 Registrar's Assistant The program was in effect throughout most of 1983 Extra interpreters made it possible to keep all restored buildings open to the public and to provide essential staff for numerous special events The additional maintenance staff augmented the regular maintenance workers in many areas, including the painting of buildings, boardwalk maintenance and toy production One COED worker has been providing full-time assistance to the livestock department and another has been working with the Curator of Textiles in the production and maintenance of Village staff costumes The Registrar's Assistant has worked on cleaning and painting storage areas, building storage bunks and, under strict supervision, on treating and restoring a number of collection agricultural implements (d) Buildings and Grounds Maintenance Fall maintenance has included the preparation of the grounds and gardens for the winter, and the storage of summer grounds keeping equipment The gardener prepared and installed the greenery and trees for Christmas in the Village buildings The lower floor of the Dalziel Barn was closed off and winterized for its use in the Christmas program With the start of the construction of the Visitors Centre, Black Creek maintenance staff removed the old entrance arch, relocated and repaired the donors' gazebo, erected the large sign acknowledging contributors to the Centre and cleared all trees and fencing in the construction site and surrounding area The barrels throughout the Village, used to house fire hydrants and hose, have all been checked and repaired Window repairs have been completed on the Pioneer Life Building and at the Rose Blacksmith Shop New carpet was installed on the stairs in the Half Way House dining room. A parking control system has been established in the Village parking lot to eliminate the excessive free use of the Lot by York students A large paddock has been fenced in behind the Sawmill Financial Comments Village attendance during the last quarter of 1983 began to show improvement and was the strongest segment of the y~ar compared to 1982 Although the attendance declined in the last three months, it declined by less than 1% and in fact during the "Christmas in the Village" program a small increase was enjoyed - 5 - B-S4l The overall decline in attendance for 1983 was 42,772. Correspondingly, the gate revenues suffered a decline of ~76,998.00. The final quarter saw an upswing in sales revenue from village outlets and gift shops with an increase of more than ~11,000 00 over the same period in 1982. Unfortunately, the year end totals for sales outlets is still down by just under ~38,000 00 B-54fo The Chairman and Members of the Executive Committee, M T R C A - Meeting 1/23/83 FROM P B Flood, Administrator Conservation Land Management Division RE Progress Report - Conservation Land Management Division PROGRAM ADMINISTRATION This report covers events, activities and project accomplishments throughout 1983 Considerable administrative staff time was spent in coordinating projects under various special employment projects The largest project, COED ($820,000 and up to 57 employees) commenced in April and progress on prjects is well underway CCDP programs are continuing in York-Peel and Brampton-Georgetown ridings The Ontario Riding project has concluded The Experience '83 Program commenced in May and employed 26 students on various projects through August Under the Provincial Works Sector Program, the Fisheries Enhancement and Parks Sector projects concluded in Mav The Forestry Stimulation project was concluded in September and a new project - Conservation Area Improvement - is continuing to March 16, 1984 WATERSHED RECREATION - PLANNING The planning priority for 1983 was the Boyd Conservation Area Master Planning Study Over the past three months, design and costing details of the preferred plan have been finalized As part of the process, an implementation staging program was developed taking into account the development priorities and budget constraints of the Authority By year end, a draft of the study report had been completed for staff review Work on master planning studies for the Albion Hills, Claireville and Heart Lake Conservation Areas continued during this period To date, COED technical staff have completed the environmental inventories and constraint mapping for each of these areas A preliminary screening of development ideas has also been carried out Under the Canada Community Development Program, major sections of the Operation/Management Plans for each Conservation and Forest and Wildlife Area has been written These documents, when approved, will provide a summary of the management philosophy and operating procedures for 'each facility and/or program offered by an Area Grounds maintenance practices for turf, tree and shrub management will also be addressed WATERSHED RECREATION - DEVELOPMENT The Albion Hills washroom and picnic shelter and the Indian Line Campground control building and supervisor's residence were the two major development projects for 1984 By acting as its o!"n general contractor, the Authority was able to upgrade the quality of construction materials used in both these facilities as well as provide for attractive landscaping treatments of the immediate surrounding area During this time, the Authority also completed the design and construction of a new entrance sign fpr the Cold Creek Conservation Area, The new sign, which measures 9' x 24', is the first major step in the Authority's new signage program designed to establish distinctive and unique image for each Area With labour and materials provided by COED, the development program for 1983 was considerably expanded Proj ects completed included the following - at Claireville Conservation Area, an equestrian centre and extensive trail system were constructed B-543 CLM PROGRESS REPORT Page -lA - at Cold Creek Conservation Area, an additional 325 square feet were added to the existing trap range building to provide office space, refreshment facilities and meeting room - at Indian Line Campground, the turning circle lias paved and lock stone pathways were installed around the newly refurbished gatehouse and control building - at Bruce's ~Iill Conservation Area, major structural repairs were made to the 1859 grist mill Improvements were also made to the interior of the picnic pavilion The COED Program also provided two crews to work on upgrading and standardizing Area signage and painting projects throughout the watershed. WATERSHED RECREATION - OPE~~TIONS During the first quarter of 1983, the usual 6 Conservation and 2 Forest and Wildlife Areas were open for public use Due to the abnormal lack of snow, normal winter recreation activities were not possible. The Albion Hills and Bruce's ~Iill ski programs were able to offer limited facilities on 3 and 2 weekends, respectively Only 5 groups at Albion Hills and Z groups at Bruce's ~Iill were able to participate in the instructional program In an effort to reduce costs, ski staff were released early None of the scheduled winter Special Events were held. During the fall, cross-country ski trails and equipment were prepared in preparation for the upcoming season By late December, the X-C program was in full operation at Albion Hills and Bruce's Mill B-544 C~l PROGRESS REPORT Page -2 Monthly Retreiver Trials were held during spring and late fall at both Claireville and Cold Creek The Bruce's Mill Maple Syrup Demonstration began the first weekend of March, a week earlier than usual Attendance for organized school tours was 4,281, a decrease of 502 over last year General public attendance was 14,249, an increase of 507 over 1982 During January, the annual delivery of 45,000 Rainbow Trout fry was received at the Glen Haffy hatchery This fish will provide the "Put and Take" stocking supply for the Glen Haffy ponds, Heart Lake and other Areas in 1984 In July, a successful "Fish Derby" was held with 8 lucky anglers catching tagged fish and winning prizes donated by Molson's and Ruko Canada The lack of winter recreation activity permitted Area staff to carry out more _ than the usual amount of routine maintenance and repairs to buildings, grounds- and facilities This work was augmented by 2 Special Employment programs At Bruce's Mill, 2 young workers were employed under the Winter Experience Program to assist with maintenance and program preparations At Claireville, Heart Lake and Boyd Areas, two 3-men crews started work under the 1983 Canada Community Development Program (CCDP) These workers assisted with building and picnic table cleaning and painting and also accomplished considerable landscape tree pruning in picnic areas This program continued throughout the summer and expanded to all Areas Under the Authority's COED program, 10 workers have been hired to assist Conservation Area staff with regular operations and maintenance These additional workers have assisted in upgrading maintenance standards to levels in previous years A crew of 3 workers at Indian Line Campground carried out new planting and maintaining all plantings They also assisted in all ground maintenance work at the campground The Experience '83 program has provided 2 crews of three students to work on Area nature trails At Claireville and Heart Lake, pruning and surfacing has been completed along with preliminary assessment of the Albion Hills trail The eastern crew completed pruming and surface improvements to trails at Bruce's Mill, Greenwood and Petticoat Creek An additional 13 students were employed as gate and boat concession atrendants At Cold Creek, 154 people attended the eight Hunter Education Courses conducted by the Area Superintendent In response to demand, section staff, in con- sultation with I&E Division staff, have revamped the Shooting Skills Program for school groups and this program is being offered to grades 7 and up starting in September During the winter, Sporting Clubs used the ranges for 2 "Ham Shoot" competitions, The Upper Canada Rifle Association held a monthly event during April - June and September In June, the National Golden Retriever Trials were held at Cold Creek The Radio Controlled Flying Club of Toronto hosted it's annual Fly-In in early August A major dog show - Sporting Dog Exhibition - involving 21 breeds was held at Cold Creek in October During the fall, 4 "Turkey Shoot" competitions sponsored by sporting clubs were held All Areas were in operation for summer activities by early ~lay with the seven swimming areas opening as scheduled the first weekend of June During July and early August, high bacteria counts resulted in the closing of Boyd, Claireville and Bruce's Mill swimming areas Bad algae growth at Heart Lake also forced periodic closing of that swimming area The Petticoat Creek pool successfully operated throughout the summer and was used by 77,659 swimmers, an increase of over 77% over the previous year At Heart Lake, a public boating program was established opening the lake to private non-motorized water craft The weekend ORCA canoe instruction programs at Claireville again were well received with 58 participants attending the eight courses / In an effort to reduce operating costs, the group (school) instructional pvogram was dropped However, equipment was rented to 3 groups to run their own program The Claireville water ski site was used for 4 tournaments including the Ontario Championships CLM PROGRESS REPORT 8-545 Page -3 At Albion Hills, the Rambling Hills Riding Club held their monthly horse show The new public riding program at Claireville began operation in June and was well received by visitors The Remedial Riding Association held a "Ride-a- Thon" in Claireville to raise funds for their work with the handicapped During the winter, Petticoat Creek staff again carried out the annual inventory of all Authority vehicles and equipment and the annual inventory for the Land Management Division of all Area tools, equipment and furnishings Division staff also devoted considerable time to preparation and processing of Tenders for the Authority's acquisition of replacement vehicles, tractors and equipment All items including 5 replacement rrucks and 4 tractors have been received Through the winter, Division staff organized a training seminar on Chainsaw maintenance and safe "felling" techniques This program sponsored by the Ontario Pulp and Paper Makers Safety Association, was attended by staff from various Authority locations and has been very favourably received by all attending It is a valuable addition to the Authority safety program A tractor maintenance seminar sponsored by the Ford Motor Company was held for operating staff involved in tractor operation Two Conservation Area supervisors and the Safety Officer attended the MNR Enforcement Course and successfully passed the test requirements They will be eligible for future appointment as Provincial Offences Officers to enforce the Authority's Conservation Area Regulations In early JulY, all lifeguard staff attended a two day cardio pulmonary resucitation course to improve the level of lifesaving skills available for emergencies Division staff were actively involved in promoting Area recreation facilities by staffing displays at the Camping on Wheels and the Canadian National Sportsmens Shows Emphasis in both displays was on Conservation Area recreation facilities Revisions have been completed and updated information pamphlets printed for campground operations, boating programs and range operation Copy for the individual Area brochures was revised and printing and distribution completed Considerable input was provided by Division staff into the preparation of the new "Conservation Areas Brochure" This brochure has been well received by Area visitors The following table shows Area attendance for the period January 3/83 to January 1/84 It shows an increase of 7,116 people or 0 7" over the same " period in 1982 ATTENDANCE AT CONSERVATION AREAS, JANUARY/83 TO JANUARY/84 1983 1982 Albion Hills 131,729 145,996 Boyd 142,177 142,315 Bruce's /vii 11 147,674 157,526 Claireville 125,246 133,545 Cold Creek 43,707 40,344 Glen Haffy 55,912 64,662 Greenwood 60,647 66,362 Ileart Lake 91,778 76,619 Indian Line 53,129 57,889 Pal grave 3,818 9,509 Petticoat Creek 156,138 110,774 Woodbridge 13,378 12,676 1,025,333 1,018,217 B-546 CLM PROGRESS REPORT Page -4 CONSERVATION LAND ~~NAGE~ENT PROGRfu~ Job creation programs funded by the Federal and Provincial Governments have enabled the Authority to accelerate resource management projects on Authority, public and privately olmed lands within the Ivatershed On Authority owned lands, staff hired under the Canada Community Development Program and the Parks Work Sector Program carried out woodlot and plantation management projects in the following locations Bolton Resource Management Tract - 288m3 (80 cords - fuelwood) Glen Major Resource Management Tract - 4,5~Om of fire guard maintenance Glen Haffy Forest and Wildlife Area - 504m 9140 cords pulpwood) - 540~3 (150 cords - undersized pine - fuelwood) - 1,600m of fireguard maintenance Claremont Forest and Wildlife Area - 3,500m of fireguard maintenance Palgrave Forest and Wildlife Area - 1~500m of fireguard maintenance Bruce's Mill Conservation Area - l30m~ (36 cords - fuelwood) In total, 6 hectares of plantation in the Glen Haffy Forest and Wildlife Area have been thinned Upgrading of firebreaks and access roads included grading, grass seeding, brush and rock removal and pruning Forest management work including thinning, selective cutting and fire guard maintenance will continue into 1984, utilizing the Parks Sector and COED job creation programs Sites include the Glen Haffy, Palgrave, Claremont and Bolton properties As part of the Resource Management Tract Program, Conservation Area staff have continued to maintain existing fireguards in the Glen Major, Goodwood, Glen Haffy and Pal grave Areas Three thousand, one hundred meters of fencing have been constructed in the Claireville Conservation Area and Bolton and Nashville Resource Management Tracts to control unauthorized motor vehicle access and garbage dumping The Parks Sector Job Creation Program has provided the labour and materials for this work Under the Fisheries Work Sector Program, which started in the fall of 1982, staff developed and posted 8 km of fishing trails in the Bolton Resource Management Tract and 4 km in the Claremont Forest and Wildlife Area Six fishing piers were also constructed for the Heart Lake Conservation Area It is anticipated that the installation of these piers will enhance the fishing opportunities in the lake This summer, the Authority took part in the Conservation Services Experience '83 Sub-Program A total of 560 meters of cold water fish h~bitat was improved on two private properties located on the headwaters of the Humber River Eroding streambanks were stabilized and artificial bank covers, deflectors and in-stream boulders were installed On a third private property, a 80m eroding streambank was stabilized The Authority has also worked in cooperation with Save Our Streams, an organization dedicated to enhancing fisheries habitat They completed stream improvement projects in the Claremont and Palgrave Forest and Wildlife Areas Signs were erected on location acknowledging the contribution of M T R C A Reforestation projects were completed on Authority lands with 50,000 seedlings planted at the Glen Major Resource Management Tract, 6,000 at the Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and Wildlife Area Boy Scout groups have planted 10,000 seedlings at the Bolton Resource ~[anagement Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd Conservation Area, and 10,000 at the Glen Najor Resource Management Tract Planning projects for resource management programs on Authority owned lands are continuing Regular staff and those working on the Forest Stimulation, COED and Parks Sector Work Programs have undertaken forest inventories on 14 properties including B-547 CDI PROGRESS REPORT Page -5 Bolton Resource Mgmt Tract Kolodziej Forest & Wildlife Area ~ashville Resource Mgmt Tract Palgrave Forest & Wildlife Area Goodl...ood Resource ~Igmt Tract Cold Creek C A Glen Major Resource ~gmt Tract Albion Hills C A Glen Haffy Forest and Wildlife Area Bruce I s ~Iill C A Heart Lake C A. Claireville C A Greenwood Forest & Wildlife Area Ebenezer Resource Mgmt Tract MUlti-year forest management plans are being finalized for these properties with the remaining rural Authority properties to follow Wildlife inventories including breeding bird census have been completed for Glen ~lajor, Bolton and Nashville Resource Management Tracts In addition, I.ildlife habitat delineation is finished for these same properties This information will be utilized in the formation of wildlife management plans and will be incorporated in the resource management plans To assist the Black Creek Group, a community environmental group, a IHldlife inventory, hab1tat an~lysis and stream assessment was completed for the Black Creek from Finch Avenue to its source With the assistance of the COED and Experience '83 programs, staff have inven- toried the rivers and streams on Authoritv properties in the rural areas This information together with the forestry, wildlife and other existing data will be used to complete the overall resource management plans for Conservation Areas, Forest and Wildlife Areas and Resource Management Tracts An Authority land reforestation inventory has been prepared which summarizes all the plantings on M T R C A property from 1957 to present A similar inventory of past erosion control and fisheries improvement projects has also been compiled To date, approximately 35 kilometers of work on streams has bel3n completed Agricultural land rental reviews have been carried out on thirteen Authority lands to date Approximately 47,525 reforestation trees were planted this spring for 20 land- owners A total of 16,043 wildlife shrubs and 3,753 trees were planted in the spring and fall under the Tree and Shrub, and Urban Wildlife programs An additional 40 container stock conifers were sold for windbreak purposes Two Conservation plans have been completed this year and a further 2 are on file To date, 35 CORservation plans have been completed for private landowners One reforestation subsidy has been approved for 19,000 trees Orders are on file for the spring of 1984 for reforestation trees, 2,310 trees and 2,820 shrubs There are orders on file for 7,000 reforestation trees for the spring of 1983 A questionnaire was prepared and delivered to a select number of landowners in the headwa-eers of the Duffin Creek, a high priority area for the application of private land conservation management programs Attitudes tOI...ards, and :he existing state of reforestation, woodlot management, and ESA management were surveyed The survey will be expanded to other headwaters areas in 1984 \ total of 205 site visits were carried out - 61 in Peel, 56 in York and 85 in Durham The high number of site visits in Durham reflects 72 which were carried out in relation to the questionnaire These site visits are carried out to provide private landowners with advice on reforesta~ion, tree and shrub planting, urban wildlife, windbreaks, wildlife habitat, erosion control, ESA management, and ponds Planting activities for private lands programs include continuing inventory of past assistance programs, a land use review of major watershed to priori:e project locatio~s and continuing agricultural land use review Staff have currently been working on programs for ESA management on Authority, private and public lands To assist in this project, both a priority and preservation list of ESAs have been prepared This priority list was based on research of existing information and communication with other staff and agencies and categorized ESAs on their need for management due to present and potential impacts Presently, 58 ESAs have been field inventoried for impacts and a management strategy for each has been prepared indicating recommendations for the management of these ESAs B-548 CLM PROGRESS REPORT Page -6 These management strategies will be incorporated into resource management plans where required, will aid in identifying priority areas for the private landowner assistance programs, and will be utilized during discussions with public agencies Promotion for Services Programs has included to date, the circulation to cable T V outlets a video tape of the Conservation Services slide presentation and news releases for various assistance programs A slide presentation on the Density Bonus Program will be completed in the near future Inventories have been completed for 90% of the primary and secondary water- courses within Metro Toronto and surrounding municipalities for the Urban Management Program The spring of 1983 saw three planting projects completed for the Rouge and Don Rivers and Highland Creek Two hundred and ninety-five trees and 1,300 wildlife shrubs have been planted In addition, approximately 200 meters of valley slope have been graded and hydro- seeded at the Etobicoke General Hospital along the Humber River Plantings were also carried out for the City of Brampton with 4,450 seedlings, 100 trees and 890 shrubs being established In the fall of 1983, under the assistance of the COED program, 7 planting projects have been completed for the Humber, Rouge and Don Rivers and Highland Creek Fifty caliper trees, 266 deciduous trees, 4,410 wildlife shrubs and 1,383 container stock have been planted In addition, another 85 trees and 735 wildlife shrubs have been supplied to two community groups - Black Creek Group and the North Toronto Collegiate Environmental Study Students to initiate revegetation projects on the Black Creek and East Don River Three private landowners were supplied with 85 deciduous trees and 310 wildlife shrubs to rehabilitate their valley slopes Approval in principal has been reached with the City of Brampton for a joint project to be conducted in 1984 on public lands Landscape projects have been carried out at the following locations (1) Humber Bay West Launching Ramp (2) Bluffer's Park (3) Fishleigh Filtration Plant (4) Ajax Waterfront (5) Indian Line Campground Entrance (6 ) Frenchman's Bay ( 7) Saddle House - Claireville Conservation Area (8) Glen Major Gravel Pit (9) (9) South Thackeray Sanitary Landfill Site (10) Bolton Channelization Project The Authority nursery program supplied trees and shrubs to various tree planting and landscape projects as well as to the Flood Control Section, MNR, South Lake Simcoe, and Kawartha Lakes Conservation Authorities and Save Our Streams Under the COED program, staff have assisted in accelerating the production of plant material used on job creation projects Six landowners were assisted in the Tree Moving Assistance Program The nursery sales for 1983 have been finalized Available Spring Fall Total Spring 1984 B R Trees 5,145 2,286 7,431 5,060 B R shrubs 23,608 22,980 46,588 40,425 Container Stock 2,092 1,566 3,658 1,694 Caliper stock 666 217 883 980 IIp 1984 01 19 <::rn PBCGRESS REPORr 8-549 FINANCIAL STATE~ENT YR TO DATE ~ BUDGET EXPENDTTURES EXPENDITURES BUDGET USED Administration 730,140 673,204 108 5 Watershed Recreation Planning 62,~84 75,000 33 ~ Conservation Area Development lR6,515 131,960 102 5 Operations ~ Maintenance 2,075,518 2,149,000 96 6 Conservation Land Management Planning 119,091 118,500 100 5 Conservation Management 307,098 109,181 99 1 Fisli Rearing 10,591 10,500 100 9 Operations - Non-Revenue ~0,171 ~1,000 98 0 REC'O TO r. BUDGET REVENUES 19~2 SUDGET DATE REC'O Operations \ Maintenance 1,016,000 1,008,289 99 2 Sonservation Management 114,000 148,694 111 0 FINANCIAL COMMENTS PROGRAM ADM!NISTRAT!ON Costs have exceeded budget by ~57,OOO The major portion of this resulted from much greater increase than anticipated for employee benefit premiums Other factors contrlbuting to the overspending were budget reduction for gapping, higher data processing costs than anticipated, additional travel costs associated with supervising special employment projects and extra supplementary staff costs ~t Central Workshop to maintain operation during prolonged sick leave for regular staff Spending reductions in uther Division programs hav~ offset this cost oLAHNTNG ~ DEVELOP~EnT The planning budget was under spent due to the fact that fewer meetings were required to complete the public participation component of the Boyd ~aster Planning Study Overall expenditures for facility development were slightly higher than projected Extra cost was incurred fabricating specialty items for the Al~ion Hills washroom building and picnic shelter CONSERVATION AREA OPERATIONS Expenditures were $73,500 under budget resulting from spending reduction done to offset revenue shortfall from early year lack of winter activities and reduced summer attendance due to water quality problems ~ctual revenue shortfall was ~8,OOO December revenues considerably exceeded the normal amount thanks to excellent early winter snow conditions Revenue from food services operation contributed ~10,OOO more than budget estimates CONSERVATION LAND MANAGEMENT The Conservation Management and non-revenue operations budgets for 19~3 were under spent by a total of ~2,712 The Fish Rearing program was overspent by ~91 and the Conservation Planning budget by $591 All program objectives for these 1983 budgets were met The revenue for Conservation Land Management Program exceeded projections due to a very active nursery and woodlot management program Additional revenues of ~14,694 were received