HomeMy WebLinkAboutExecutive Committee 1983
~ B-1
,
the metropolitan to ronto' and region conservation authority
minutes
EXECUTIVE COMMITTEE 16-FEBRUARY-l983 #1/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 16-February-1983.
PRESENT
Chairman Mrs. F.E. Gell
lTice-Chairman E.V. Kolb
Members W.G. Barber
M.W.H. Biggar
E. Fulton
Mrs. !.. Hancey
H. C". !.awr ie
S.A. Macpherson
Ms . S . Nimmo
.1.5.. Scott
Clarkson, Gordon Bruce Jackson
" ". !.ynne MacInnes
" " Eileen Foley
ABSENT
Member Mrs.. N". Stoner.
MINUTES
Res. H Moved by: B.A.. Macpherson'
Seconded by: M.W.H~ Biggar'
THAT the Minutes of Meeting #20/82 b& approved.
CARRIED ;'
SEC'l'IOH; I
ITEMS FO~ CONSIDERATIO~
l. MTRCA CLASS ENVIRONMENTA!. ASSESSMENT FOR EROSION AND SEDIMENT CONTRO!.
AND C!.ASS ENVIRONMENTA!. ASSESSMENT FOR ON-SITE FLOOD CONTRO!. STRUCTURES
-Withdrawal of Documents from the Environmental Assessment Act Process
Res.. #"2 Moved by: Mrs'. G. Hancey
Seconded by: E'.V. Kolb
WHEREAS a water. management class environmental assessment is currently being
prepared under the auspices of th& Association' of Conservation Authorlties
of Ontario' designed. to<' be- applicable- to all ConservatioIr' Authori ties in the-
Province;.
THEREFORE THE EXECUTIVE' COMMITTEE' RECOMMENDS: THAT'" iIt' the interest of
uniformity, the. Authori ty make formal submission' to the- Minister of the.
Environment requesting that the' "Class' Environmental Assessment for Erosion'
and Sediment- Control" and the;. "Class- Env ironmenta.l. Assessment fo r On-S i te
Flood Con.trol Structures.'" be- wi.thdrawn: from. the: Environmental Assessment Act
procesS';-
AND FURTHER THAT the. Minister' be advised of the- Authority'S support for and
intent to implement the "Class Environmental. Assessment fO.r Water Management
Structural Measures", as prepared under the auspices:. of the Association of
Conservat'ion Authorities or. Ontario' once. the: document has:. received' final
approva-l..
CARRIED;
B-2 -2-
2. 1ge3 BUDGET ESTIMATES
Res. t3 Moved by E.V. Kolb
Seconded by J.S. Scott
THAT the 1983 Budget Estimates, as appended as Schedule "An of these
Minutes, be received;
THAT the 1983 General Budget Estimates and 1983 Capital Program, dated
February 16, 1983, be adopted;
AND FURTHER THAT the following action be taken:
(A) All current projects included in the 1983 General Budget Estimates
be approved and adopted;
(B) AND WHEREAS the Conservation Authorities Act provides that, for the
carrying out of any Project, an Authority shall have the power to
determine the portion of total benefit afforded to all municipalities
that is afforded to each of them, The Metropolitan Toronto and Region
Conservation Authority therefore enacts as follows:
(i) That all member municipalities be designated as benefiting
for all General Current Projects included in the 1983
General Current Budget;
(ii) The Authority's share of the cost of the General Current
Project included in the 1983 General Current Budget, as set
forth in the 1983 General Current Budget, shall be raised
from all member municipalities as part of the 1983 Annual
General Levy;
( iii) The 1983 Annual General Levy for Administration, Operations
and Maintenance Programs, Conservation and Recreation Land
Management, and the current programs of Water and Related
Land Management, be apportioned to the participating
municipalities in the portion that the equalized assessment
of the whole are under the jurisdictton of the Authozity,
unless otherwise provided in the Levy;
( iv) The appropriate Authority officials be inst=ucted to advise
all municipalities pursuant to the Conservation Authorities
Act and to levy the said municipalities the amount set forth
in the 1983 General Current Levy;
(v) The Executive Committee be authorized to reduce the said Budget
and Levy, should such action be deemed expedient;
(C) The 1983 Capital Works Program and the 1983 Capital Levy for Projects
included therein and dated February 16, 1983, be adopted;
AND WHEREAS the Conservation Authorities Act provides that an Authority
may, from time to time, determine what monies will be required for
Capital expenditure in connection with any projects, and further
provides for the method of raising such monies from the participating
municipalities;
THAT the following action be taken:
(a) All member municipalities be notified of the amount of such monies
they are required to raise in 1983, on the basis set forth in the
1983 Capital Works Program and Levies for
( i) Land Acquisition Project 1983
(ii). Lake. Ontario Waterfront Development Project 1983.
(b) The Municipality of Metropolitan Toronto. be levied for:
( i) Highland Creek Erosion Control Project 1983
(ii) Erosion Control and Slope Stabilization Project 1983
(ii i) Shoreline Management portion of Lake Ontario
Waterfront Development Project 1983.
(c) The Req"ional MUnicipali ty of Peel be. le"ied for the' Erosion Con.trol
and Slope Stabilization Project 1983.
-3- B-3
(d) The Regional Municipality of York be levied for the Erosion
Control and Slope Stabilization Project 1983.
(e) The Reqional Municipality of Durham be levied for the Erosion
Control and Slope Stabilization Project 1983.
( f) The appropriate Authority officials be instructed to advise all
municipalities pursuant to the Conservation Authorities Act,
and to levy the said municipalities the amounts set forth in the
1983 Capital Works levies.
CARRIED;
3. DRAFT FINANCIAL STATEMENTS FOR PERIOD ENDING DECEMBER 31, 1982
Res. i4 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
THAT Mr. Bruce Jackson, of the firm Clarkson Gordon, be thanked for his
review of the Draft Financial Statements for the period ending December 3l,
1982;
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Financial Statements for
the period ending December 31, 1982, be approved and signed by the Chairman
and the Secretary-Treasurer of the Authority, and distributed in accordance
with Section 39 (3 ) of the Conservation Authorities Act;
AND FURTHER THAT the Supplementary Schedules be referred to the Budget and
Finance Sub-Committee, when appointed, for study and report to the
Executive Committee
CARRIED;
4. REMUNERATION OF CHAIRMAN AND VICE-CHAIRMAN
AND MEMBERS' PER DIEM AND MILEAGE
Res. jt5 Moved by Ms. S. Nimmo
Seconded by: S.A. Macpherson
THE EXECUTIVE COMMITTEE RECOMMENDS THAT effective February ll, 1983
The Chairman's remuneration be $l9,000 00 per annum;
The Vice-Chairman's remuneration be $7,500 00 per annum;
The Members' per diem be $50 00.
CARRIED;
5 APPOINTMENTS TO FUNCTIONAL ADVISORY BOARDS
AND EXECUTIVE SUB-COMMITTEES - 1983
Res. #6 Moved by: J S. Scott
Seconded by Mrs L Hancey
THAT the communication having regard to appointments to the Functional
Advisory Boards and Executive Sub-Committees for 1983 be received;
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the recommendations, as
amended and set forth herein, be approved
B-4 -4-
CONSERVATION LAND MANAGEMENT
Chairman: Lawrie, H.C. Appointees Bell, R E.
Vice-Chairman Jackson, Don Caldwell, S.W.
Members Gibson, Chris Gardhouse, G.
Gillespie, R. Gurney, F.
Jessop, C. McDermott, N.
Lloyd, B.
Stewart, M.M.R.
Sutter, E.F.
Yuill , R.F.M.
FLOOD CONTROL AND WATER CONSERVATION
Chairman Scott, J.S. Appointees Gardner, Mrs. F.E.
Vice-Chalrman Herridge, W.R., QC James, Prof. R.L.
Members: Crowe, R.J.
Davidson, J.
HOllingshead, A.D.
Kelly, W.J.
King, E.
Martin, L.
McKechnie, F.J.
Prinsloo, Mrs M.
Stoner, Mrs. N.
Witty, J.
HISTORICAL SITES
Chairman Biggar, M.W.H. Appointees: Bradshaw, J.
Vice-Chairman Perkins, F R McGinnis, J.A.
Members Currie, D.W. Neil, Mrs. E.
Dancey, R. Russell, Dr. L.S.
Jackson, Mrs. L.D Scott, Dr. J.W.
Kravetz, Ms. S.B.
Moran, R A.P
- Sutherland, Mrs. B.
Thompson C. E.
0
INFORMATION AND EDUCATION
Chairman Nimmo, Ms. Sandra Appointees Brown, C.G.
Vice-Chairman Bryson, J A. Downing, J.
Members Cook, D.L. Dunlop, W.J.
Hancey, Mrs. L. Huhn, Mrs. C.C.
Smoke, A.L. Leith, Dr. T H.
Sutherland, W. Nelligan, B. E.
Tovell, Dr. W.M Zajac, Mrs. D.
WATERFRONT
Chairman Fulton, Edward Appointees Breen, M J.
Vice-Chairman McLean, W G Norton, G.F.R.
Members Barber, W G
Braithwaite, L.A. , QC
Cruickshank, Mrs F
Fleet, D.G.
Lipton, M.D., QC
Macpherson, S.A.
Robertson, A.
Sewell, J.
Sinclair, G.B.
Sm i th, M M., QC
EXECUTIVE Sua-COMMITTEES
Budget & Finance Chairman Scott, J.S
Members Fulton, E.
Kolb, E. V
Hancey, Mrs L.
Herridge, W.R., QC
Nimmo, Ms S.
Stoner, Mrs. N.
Sutter, E.F
-5- B-5
EXECUTIVE SUB-COMMITTEES (Contd. )
Personnel Chairman: Hancey, Mrs. L.
Members Barber, W.G.
Biggar, M.W.H.
Bryson, J.A.
Jackson, D.
Lawrie, H.C.
Macpherson, S.A.
Recognition: Chairman: Stewart, M.M.R.
Members: Barber, W.G.
Prinsloo, Mrs. M.
Sutherland, Mrs. B.
Conservation Farm: Chairman: Kolb, E.V.
Members: Bell , R.E.*
Caldwell , S.W *
Lawrie, H.C.
Leith, Dr. T.H.*
Lowe, G. *
Redelmeier, F.*
Wall, A.A.*
Marketing Plan: Chairman McLean, W.G.
Members Biggar, M.W.H.
Lawrie, H C.
~immo, Ms. S.
Smoke, A.L.
Stewart, M.M.R.
Black Creek Pioneer
Village Visitor Centre Chairman Kolb, E.V.
Members Barber, W.G.
Biggar, M W.H.
Bryson, J.A.
. Macpherson, S.A.
Food Service Chairman . Biggar, M.W.H.
Members: Lawrie, H.C.
Macpherson, S.A.
~immo, Ms. S.
EMPLOYEE SUGGESTIO~ AWARD COMMITTEE
Chairman Hancey, Mrs. L.
*Denotes Appointment by Authority
In accordance with Rule #6 - Rules for the Conduct of the Authority - Resolution
#88/75, as amended, biographies of persons recommended for appointment to
functional advisory boards are appended as Schedule "B" of these Minutes.
CARRIED;
6 SCHEDULE OF MEETINGS - 1983
Res. P Moved by J S. Scott
Seconded by Mrs. L. Hancey
THAT the schedule of Executive Committee and Authority meetings, as set
forth herein, be approved;
THAT functional and watershed advisory board meeting dates be arranged by
the Chairmen of these Boards, in consultation with the respective Division
Administrators;
THAT the members of the five functional boards, together with the members
of the four watershed boards, be paid per diem and mileage to a maximum of
four meetings per annum; any additional meetings to be authorised by the
Executive Committee;
AND FURTHER THAT the members of the Executive Sub-Committees be paid
per diem and mileage for attendance at meetings as called by the Chairmen
of the various Sub-Committees
B-6 -6-
FEBRUARY (February meeting schedule adopted with 1982 meetings)
FRIDAY FEBRUARY 25 9 30 A.M. AUTHORITY '2 (BUDGET)
MARCH
Wednesday March 9 9:30 a.m. Executive '2
Wednesday March 23 9:30 a.m. Executive .3
APRIL
Wednesday April 6 9 30 a m. Executive t4
Wednesday April 20 9: 30 a.m. Executive '5
MAY
Wednesday May 4 9 30 a.m Executive #6
FRIDAY MAY 6 9:30 A.M. AUTHORITY '3
Wednesday May l8 9 30 a.m. Executive #7
JUNE
Wednesday June 1 9 30 a.m. Executive #8
Wednesday June l5 9 30 a m E.xecutive #9
FRIDAY JUNE l7 9 30 A.M AUTHORITY #4
Wednesday June 29 9 30 am. Executive no -
JULY
Wednesday July l3 9 30 a.m Executive ill
AUGUST
Wednesday August lO 9 30 a.m. Executive #l2
SEPTEMBER
Wednesday September 7 9 30 a m Executive ill3
Wednesday September 21 9 30 a m Executive #l4
OCTOBER
Wednesday October 5 9 30 a.m. Executive tl5
FRIDAY OCTOBER l4 9 30 A.M. AUTHORITY #5 (PREL BUDGET)
Wednesday October 19 9 30 a.m Executive #l6
NOVEMBER
Wednesday November 2 9 30 a.m Executive n 7
Wednesday November l6 9 30 a m. Executive #l8
Wednesday November 30 9 30 a m Executive #19
-7- B-7
DECEMBER
wednesday December 14 9: 30 a.m. Executive #20
JANUARY 1984
Wednesday January 11 9: 30 a.m. Executive #21
Wednesday January 25 9:30 a.m. Executive '22
FEBRUARY 1984
FRIDAY FEBRUARY 17 9:30 A.M. AUTHORITY TWENTY-EIGHTH ANNUAL
wednesday February 22 9:30 a.m. Executive 1tl/84
MARCH 1984
FR IDA Y MARCH 2 9:30 A.M. AUTHORITY #2 (BUDGET)
ANY ADDITIONAL MEETINGS REQUIRED WILL BE HELD AT THE CALL OF THE CHAIRMAN
CONCERNED.
CARRIED~
SECTION II
ITEMS FOR INFORMATION
7. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res. t8 Moved by Mrs. L. Hancey
Seconded by: M.W.H. Biggar
THAT the applications listed herein as A(l) to A(9) inclusive, be approved,
subject to the ~onditions contained in the reports
CARRIED;
A(l) Slough EstateS Limited
To place fill within regulated area adjacent to the Mimico Creek,
west of Airport Road, north of Derry Road, City of Mississauga
Subject to
(a) All work being done in accordance with Sheet #Al, Project #8474,
prepared by J C. Van Huyse and forming part of the permit;
(b) A temporary snow fence or other suitable barrier 'being erected
along the top of the bank prior to commencement of construction
and remaining in place until all construction is completed.
A(2) Town of Vaughan
To construct sanitary sewer crossing of Don River north of Steeles
Avenue, east of Dufferin Street
Subject to
All work being carried out in accordance with Drawing #Al-827l0-GlA
and Al-82710-PlA, as, prepared by Proctor & Redfern Ltd., and dated
July, 1982.
A(3) William & Lucia Morgan
To construct addition to building in flood plain of the Humber River,
adjacent to Wilcocks Lake, Town of Richmond Hill
Subject to
All work being done in accordance with the drawings forming part of
the permi t.
8-8 -8-
A(4) Mr. A. Mirza
To replace two industrial buildings at t354A Eastern Avenue, City
of Toronto (Don River Watershed) with two modern structures
Subject to:
All work being carried out in accordance with Drawing tAl
prepared by Pierson Ltd , Engineers & Contractors, and dated
January 1983
A(S) East Woodbridge Developments Ltd ,
To construct sanitary sewer and watermain crossing of the Robinson
Creek, and storm sewer outfall south of Langstaff Road, east of
Highway #27, Town of Vaughan (Humber River Watershed)
Subject to:
All works being carried out in accordance with the following drawings
prepared by Ander Engineering Associates Ltd.
File 82-112 Dwg. Nos. 8l-112-l, sheet 1 of 2
81-112-5, sheet 1 of 1
81-112-6, sheet 3 of 3
81-112-8, sheet 1 of 1
File 82-l06 Owg. Nos. 82-l06-5, sheet 2 of 2
82-106-12, sheet 1 of 1
A(6) Mr A. Roman
To construct on-stream pond immediately north of Elgin Mills Road,
Town of Markham (Rouge River Watershed)
-
Subject to
(a) All surplus excavated material not being placed within the limits
of the Regional Flood Line as defined by the Authority;
(b) All disturbed areas being seeded and/or sodded as quickly as possible
in order to avoid erosion of soil;
(c) Two sediment control traps being installed downstream of the proposed
construction. These traps shall remain in good working order during
and up to final completion of construction;
(d) The silt traps being located as shown on Drawing '1-5;
(e) All work being undertaken and completed in accordance with Drawing
U-5, Project tY-M 1982, dated March 1982, as prepared by
D Miklas & Associates Limited.
A(7) Mr Pino & Mrs. Marie Cassata
To place fill adjacent to the Don River south of May Avenue, east of
Kersey Crescent, Town of Richmond Hill
Subject to
(a) All work being done in accordance with the site plan prepared by
P Salna Co. Ltd , and dated November 8, 1982;
(b) All excess fill being removed from the site after completion of
construction
-9- B-9
A(8) The Regional Municipality of Peel
To construct Derry Road East and Airport Road subway, and to
re-construct Derry Road East and Airport Road, City of
Mississauga (Mimico Creek Watershed)
Subject to:
(a) All works proposed being carried out in accordance with Drawings
81.5.1-06.10, 81.5.1B-13, 17, 21, 22, and 25 of Project 8l-406B,
Derry Road East and Airport Road Subways and Reconstruction;
(b) All areas disturbed during construction of the project being
restored to the satisfaction of the Authority;
(c) Sediment and erosion control measures being undertaken as
outlined in the application for permit.
A(9) City of Brampton
To construct two storm sewer outfalls to the Etobicoke Creek,
south of Church Street, east of Main Street, Brampton
Subject to:
(a) All work being done in accordance with Sheet Nos. 3 and 4, Drawing
G3-29, as prepared by the City of Brampton;
(b) All disturbed areas being restored to the satisfaction of the
Authority.
8. CITY OF NORTH YORK
-Request for Permanent Easemen~ south of Finch Avenue, east of Jane
Street (Humber River Watershed)
Res. #9 Moved by M.W.H. Biggar
Seconded by: Mrs. L. Hancey
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the City of North York to grant a permanent
easement across Authority-owned land required to facilitate a storm and
sanitary sewer in the Finch Avenue, east of Jane Street area;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to cooperate with the City
of North York in this instance;
THAT a Permanent Easement, containing 0 l4l acres, more or less, be granted
to the City of North York for a storm and sanitary sewer located south of
Finch Avenue, east of Jane Street; said land being Parts of Lots l, 2, and
3, Plan MX-l05, City of North York (The Municipality of Metropolitan
Toronto), designated as Part 1 on Plan 66R-l3438 Consideration to be the
nominal sum of $2 00, pl us all legal, survey, and other costs;
THAT said Easement be subject to an Order-in-Council being issued in accord-
ance with Section 2l(c) of The Conservation Authorities Act, R.S.O. 1980,
Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
9 CITY OF NORTH YORK
-Request for Permanent Easement south of Steeles Avenue, east of
Dufferin Street (Don River Watershed)
Res nO Moved by Mrs. L. Hancey
Seconded by W.G. Barber
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the City of North York to grant a permanent ease-
ment across Authority-owned land required to facilitate a storm sewer in
the Steeles Avenue/east of Dufferin Street area;
-
B-lO -10-
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to cooperate with the
City of North York in this instance;
THAT a Permanent Easement, containing 0.048 acres, more or less, be
granted to the City of North York for a storm sewer located south of
Steeles Avenue, east of Dufferom Street; said land being Part of Lot
25, Concession II, W.Y.S., City of North York (The Municipality of
Metropolitan Toronto), designated as Part 1 on Plan 64R-9553.
Consideration to be the nominal sum of $2.00, plus all legal, survey,
and other costs;
THAT said Easement be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act,
R.S.O. 1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
lO CITY OF MISSISSAUGA
-Request for Permanent Easement for re-location of power line for
construction of Hwy. #427 and Finch
Avenue (Humber River Watershed)
Res Hl Moved by: W.G. Barber
Seconded by H.C. Lawrie
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from Mississauga Hydro-Electric Commission to grant
a Permanent Easement across Authority-owned land, required to facilitate
an electric power line in the Highway #427/Finch Avenue area;
AND WHEREAS it is the opinion of the Authority that it is in the best
. interest of the Authority, in furthering its objectives, as set out in
Section 20 of the Conservation Authorities Act, to cooperate with the
Mississauga Hydro-Electric Commission in this instance;
THAT a Permanent Easement, containing 0 032 acres, more or less, be granted
to the Mississauga Hydro-Electric Commission for an electric power line to
be re-located to facilitate the construction of Highway #427 and Finch
Avenue; said land being Part of Lot l3, Concession IX, E.H.S., City of
Brampton (The Regional Municipality of Peel), designated as Part 1 on Plan
43R-l03l5 Consideration is to be the nominal sum of $2.00;
THAT said Easement be subject to an Order-in-Council being issued in
accordance with Section 2l(c) of The Conservation Authorities Act, R.S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARR IED ;
ll. THE MUNICIPALITY OF METROPOLITAN TORONTO
-Request for Permanent Easement north of the Queensway, west of the
West Mall, Borough of Etobicoke
(Etobicoke Creek Watershed)
Res H2 Moved by M W.H. Biggar
Seconded by S.A. Macpherson
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from The Municipality of Metropolitan Toronto to grant
a Permanent Easement across Authority-owned land, required to facilitate a
sanitary sewer located north of the Queensway, west of the West Mall area;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with The
Municipality of Metropolitan Toronto in th i s instance;
-11- B-ll
THAT a Permanent Easement containing a total of 0.402 acres, more or less,
be granted to The Municipality of Metropolitan Toronto for a sanitary
sewer located north of the Queensway, west of the West Mall; said land
being Part of Lot 13, Concession IV, C.S.T., Borough of Etobicoke (The
Municipalitr of Metropolitan Toronto), and Part of Lot 13, Registered
Plan 598, Clty of Mississauga (The Regional Municipality of Peel),
designated as Part 1 on Plan 64R-9692 and Part 1 on Plan 43R-1059l.
Consideration to be the nominal sum of $2.00, plus all legal, survey, and
other costs;
THAT said Easement be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act, R.S.O.
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
12. LAND ACQUISITION PROJECT 1982-1984: DON RIVER WATERSHED
-Property: Greenway Homes Limited,
West side Leslie Street, south of Steeles Avenue,
City of North York
Res U3 Moved by: Mrs. L. Hancey
Seconded by: W.G. Barber
THAT the report (January 31, 1983) set forth herein, received from the
Manager, Property & Administrative Servgices, be adopted, and tha t the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re Project: Land Acquisition Project 1982-l984: Flood
Plain and Conservation Land Component -
Don River Watershed
.
Authority Executive Resolution t88, Meeting H -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property West side of Leslie Street
Owner Greenway Homes Limited
Area to be acquired 0.l03 acres, more or less
Recommended purchase price Nominal consideration of $2.00
"Included in the requirements for the above-noted project is an
irregularly-shaped parcel of land, being Block 20, Plan M-l923, City of
North York (The Municipality of Metropolitan Toronto) , located on the west
side of Leslie Street, south of Steeles Avenue
"Negotiations have been conducted wi th the owner, and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
The purchase price is to be the nominal consideration of $2.00,
with date of completing the transaction to be as soon as
possible
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the clos i ng , for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive conveyance of
the land required free from encumbrance.
"A map showing the general location of the property is attached. A plan
illustrating the specific location will be available at the meeting
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources fo r an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-ll-401 - Flood
Control Acquisition."
B-l2 -l2-
13. LAND ACQUISITION PROJECT 1982-l984 HUMBER RIVER WATERSHED
-Property: George W.L. & Helena Mary Fox
#40 John Street, Bolton, Town of Caledon
Res. #14 Moved by: E. Fulton
Seconded by H.C. Lawrie
THAT the report (February 4, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re Project Land Acquisition Project 1982-1984 - Flood
Plain and Conservation Land Component
Humber River Watershed
Authority Executive Resolution t88, Meeting #4 -
Apr il 8, 1981, and Authority Resolution
'38, Meeting #3 - May 15, 1981
Subject property: #40 John Street, Bolton
Owners George W.L. & Helene Mary Fox
Area to be acquired a) . 0.091 acres, more or less - purchase
b) 0.032 acres, more or less - permanent
easement
Recommended purchase price $4,000.00, plus vendors' legal costs and
replacement of trees with suitable
landscaping
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residental property,
being Part of Lot 80, Registered Plan BOL-7, Town of Caledon (The Reg ional
Municipality of Peel) This land is required for the Bolton channelization
works This transaction also includes the acquisition of a Permanent
Easement for maintenance of the flood control works.
"Negotiations have been conducted with the owners and their so-licitor,
Mr J. K~nneth Kidd, Q.C., #604 Federal Building, 85 Richmond Street West,
Toronto, Ontario, M5H 2C9, and, subject to the approval of your Committee,
agreement has been reached with respect to a purchase price, as follows
The purchase price is to be the sum of $4,000 00, plus vendors' .legal
costs and replacement of trees with suitable landscaping, with date of
completing this transaction to be as soon as possible The purchase
also includes payment in full for the Permanent Easement and any dis-
turbance resulting from the construction.
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid The Authority is to receive conveyance of
the land required free from encumbrpnce, with the following exceptions, the
precise wording of which is to be drafted by the Authority's solicitor
a) should the land cease to be required for flood control purposes,
the owner is to have the right to re-purchase;
b) . the Authority shall not take any action to substantially inter-
fere with the flow or course of the Humber River adjoining the
owners' land, except during periods of above-average occurrence
and volume caused as a result of flooding, storms, or otherwise.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-ll-40l - FLood
Control Acquisition; "
-13- B-13
14. LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property: The Municipality of Metropolitan Toronto
East side Black Creek Drive, north of Indus~ry
Street, City of North York
Res. t15 Moved by: Mrs. L. Hancey
Seconded by: S.A. Macpherson
THAT the report (January 28, 1983) set forth herein, received from the
Manager, Property & Administrative Services; be adopted, and that the
Secretary-Treasurer be authorized and directed to complete th~ purchase.
CARRIED;
"Re: Project: Land Acquisition Project 1982-1984 - Flood
Plain and Conservation Land Component
Humber River Watershed
Authority: Executive Resolution t88, Meeting '4 -
April 8, 1981, and Authority Resolution
'38, Meeting 13 - May 15, 1981
Subject property: East side of Black Creek Drive,
north of Industry Street
Owner The Municipality of Metropolitan Toronto
Area to be acquired: 1.216 acres, more or less
Recommended purchase price Nominal consideration of $2.00
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being All of Block 'F', Registered Plan 5759, City of
North York (The Municipality of Metropolitan Toronto), located on the east
side of Black Creek Drive, north of Industry Street.
"Negotiations have been conducted wi th officials of The Municipali ty of
Metropolitan Toronto, and, subject to the approval of your Committee, agree-
ment has been reached with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2.00,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal fir!ll Gardiner,
Roberts be instructed to complete the purchase All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive conveyance of
the land required free from encumbrance, with the exception of any existing
registered easements
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-ll-40l - Flood
Control Acquisition."
l5 LAND ACQUISITION PROJECT 1982-l984 ETOBICOKE CREEK WATERSHED
-Property: Ontario Hydro
North side of the Queensway, east of Dixie Road,
City of Mississauga
Res #l6 Moved by E Fulton
Seconded by M.W.H. Biggar
THAT the report (January 27, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re Project Land Acquisition Project 1982-l984 - Flood
Plain and Conservation Land Component
Etobicoke Creek Watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
B-l4 -l4-
Subject property: North side of the Queensway
Owner Ontario Hydro
Area to be acquired 2.651 acres, more or less
Recommended purchase price $6,628.00
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lot 3, Concession I, City of
Mississauga (The Regional Municipality of Peel), fronting on the north side
of the-Queensway, east of Dixie Road
"Negotiations have been conducted with officials of Ontario Hydro and,
subject to the approval of your Committee, agreement has been reached with
respect to a purchase price, as follows
The purchase price is to be the sum of $6,628.00, with date of
completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid The Authority is to receive conveyance of
the land required free from encumbrance, with the exception of any existing
registered easements.
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Reources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-ll-40l - Flood
Control Acquisition."
l6 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property Colleen Mary Murphy
#30 John Street, Bolton
Res #l7 Moved by J.S. Scott
. Seconded by S.A. Macpherson
THAT the report (February l6, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re Project Land Acquisition Project 1982-l984 - Flood
Plain and Conservation Land Component
Humber River Watershed
Authority Executive Resolution #88, Meeting #4 _
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property #30 John Street
Owner Colleen Mary Murphy
Area to be acquired a) 0 035 acres, more or less - purchase
b). 0.016 acres, more or less - permanent
easement
Recommended purchase price $4,500 00, plus vendor's legal costs and
replacement of trees with suitable land-
scaping, together with construction of a
4' chain link fence
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residential property,
being Part of Lots l85 and 25, Plan BOL-7, Town of Caledon (The Regional
Municipality of Peel) This land is required for the Bolton channelization
works. This transaction also includes the acquisition of a Permanent
Easement for maintenance of the flood control works.
"Negotiations have been conducted wi th the owner, and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
-15- B-15
The purchase price is to be the sum of $4,500.00, plus vendor's
legal costs and replacement of trees with suitable landscaping,
together with construction of a 4' chain link fence, with date
of completing this transaction to be as soon as possible. The
purchase also includes payment in full for the Permanent Ease-
ment, and any disturbance resulting from construction.
AI recommend approval of this purchase, and that the lagal firm of
Gardiner, Roberts be instructed to complete the purhcase. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements, are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance, with the following
exceptions, the precise wording of which is to be drafted by the
Authority's solicitor:
a). should the land cease to be required for flood control purposes,
the owner is to have the right to re-purchase~
b). the Authority shall not take any action to substantially inter-
fere with the flow or course of the Humber River adjoining the
the owner's land, except during periods of above-average
occurrence and volume caused as a result of flooding, storms,
or otherwise.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-11-401 - Flood
Control Acquisition."
l7 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property Peter J. & Caecilia M. Terhart
#176 King Street East, Bolton
Res. #18 Moved by: Mrs. L. Hancey
Seconded by: E. Fulton .
THAT the report (February 16, 1983) set fo~th herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED~
"Re: Project Land Acquisition Project 1982-l984 - Flood
Plain and Conservation Land Component
Humber River Watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property #l76 King Street East
Owners: Peter J. & Caecilia M. Terhart
Area to be acquired a) 0.040 acres, more or less - purchase
b) 0.Ol8 acres, more or less - permanent
easement
c) 0.020 acres, more or less - temporary
easement
Recommended purchase price $4,000.00, plus vendors' legal costs,
construction of a 4' vinyl chain link
fence, and replacement of trees with suit-
able landscaping
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residential property,
oeing Part of Lot 185, Plan BOL-7, Town of Caledon (The Regional
Municipality of Peel) This land is required for the Bolton channelizatlon
works. This .ransaction also includes the acquisition of a Permanent Ease-
ment for maintenance of the flood control works; and a Temporary Easement
for a period of three months to facilitate construction
B-16 -l6-
"Negotiations have been conducted with the owners, and, subj ect to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
The purchase price is to be the sum of $4,000.00, plus vendors'
legal costs, construction of a 4' vinyl, chain link fence, and
replacement of trees with suitable landscaping. The purchase
also includes payment in full for the Permanent and Temporary
Easements, and any disturbance resulting from the construction,
together with an amount to cover the owners' concerns regarding
injurious affection.
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive conveyance of
the land required free from encumbrance, with the following exceptions, the
precise wording of which is to be drafted by the Authority's solicitor:
a) . should the land cease to be required for Flood Control purposes,
the owner is to have the right to re-purchase;
b) . the Authority shall not take any action to substantially inter-
fere with the flow or course of the Humber River adjoining the
owners' land, except during periods of above-average occurrence
and volume caused as a result of flooding, storms, or otherwise
"The Administrator of the Water Resource Division has reviewed' this pro-
posed acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-ll-40l - Flood
Control Acquisition.
"This recommendation, upon adoption will supersede Resolution #423 adopted
by the Executive Committee of the Authority at #20/82 held 1983.01.26."
l8 AQUATIC PARK
-City of Toronto Proposal for Leslie Street Spit
.
Res U9 Moved by: E. Fulton
Seconded by W G. Barber
THAT the Clause embodied in Report #2 of the Neighbourhoods Committee, as
adopted by the City of Toronto COuncil at its meeting held January lO, 1983,
be received;
THAT the City of Toronto's recommendations with respect to the Leslie Street
Spit be referred to the Aquatic Park Planning Task Force for consideration;
AND FURTHER THAT the City of Toronto be so advised.
CARRIED;
19 QUOTATION #CLM83-01
-Two Diesel Tractors
The following complete quotations have been received for the supply and
delivery of two 1983 Diesel-powered tractors similar to Ford Model 3610
Westmetro Ford $29,564 lO
Ken Maynard 37,034 74 (1982 model *1040)
Ken Maynard 39,138.63 (l983 model *2lS0)
The following incomplete quotation was received The quotation did not
display the company seal as required
Edwards Equipment $28,890 00
The above prices include all applicable taxes
Res #20 Moved by Mrs. L Hancey
Seconded by: J.S. Scott
THAT the quotation of Westmetro Ford Sales Ltd for the supply and delivery
of two (2) new 1983 Diesel-powered tractors, similar to Ford Model 3610, in
the sum of $29,564 lO, including all applicable taxes, be accepted; it
being the lowest proper quotation received
CARRIED;
-17- B-17
20. QUOTATION iCLM83-02
-Two Diesel Tractors with Loaders
The following quotations have been received for the supply and delivery
of two (2) 1983 Diesel-powered tractors similar to Ford Model 4110 tractor
and Model 776B Quicktach loader:
Westmetro Ford $45,123.60
Ken Maynard 52,754.15 (1982 model 1640)
Ken Maynard 54,213.05 (1983 model 2350)
Edwards Equipment 56,496.00 (MF270)
Res. #21 Moved by: Mrs. L. Hancey
Seconded by: J.S. Scott
THAT the quotations of Westmetro Ford Sales Ltd. for the supply and
delivery of two (2) new 1983 Diesel-powered tractors with front end loader,
similar to Ford Model 4110, and a Ford 776B Quicktach loader, in the sum of
$45,123.60, includiny all applicable taxes, be accepted; it be i ng the
lowest proper quotat on received.
CARRIED;
21- QUOTATION #CLM83-03
-Cold Creek Conservation Area: Targets & Ammunition
The following quotations have been received for the supply of Clay Bird
targets and ammunition for re-sale at Cold Creek Conservation Area
l,500 cases Clay Birds - FLuorescent Orange:
Lawry Shooting Sports Ltd. $ 9,450.00
Searle SHooting Supplies Ltd. 10,215.00
Hallam Sporting Goods Ltd. No quote
Ammunition Hallam Sporting Lawry Shooting Searle Shooting
Goods Ltd. Sports Ltd Supplies Ltd.
.
100 cases l2 ga.
(No 7-l/2 - l-oz.) $l3,lOO.00 $13,300.00 No quote
lO cases 20 ga. l,320.00 l,340.00 $l,320 00
3 case .22 cal 618.00 624 00 666.75
$l5,038.00 $l5,264.00 $1,986 00
All prices are PST exempt.
Res #22 Moved by: Mrs L. Hancey
Seconded by J S. Scott
THAT the quotations for the supply of targets and ammunition to the
Cold Creek Conservation Area for re-sale, be accepted as follows, they
being the lowest acceptable quotations received
Lawry Shooting Sports Inc. for the supply of the 1983 requirements for
l,500 cases of Clay Bird targets, in the sum of $9,450.00, PST exempt;
Hallam Sporting Goods Ltd. for the supply of lOO cases l2 gauge (No 7-1/2
l-oz.) ; 10 cases 20 gauge, and 3 cases 22 calibre shells, in the sum of
$15,038.00, PST exempt.
CARRIED;
22 QUOTATION ilCLM83-04
-Three Mott Mowers
The following quotations have been received for the supply and delivery of
three (3 ) new 1983 Mott 88CC mowers:
Duke Lawn Equipment $l2,073.88
Nobleton Farm Service l2,09l.00
Clark Moore Motors l2,823.95
The above prices include both Federal and Provincial Sales Taxes.
B-18 -18-
Res. t 23 Moved by Mrs. L. Hancey
Seconded by: J.S. Scott
THAT the quotation of Duke Lawn Equipment for the supply and delivery of
three (3) Mott 88CC mowers in the sum of $12,073 88, including all
applicable taxes, be accepted; it being the lowest proper quotation
received.
CARRIED;
23. QUOTATION tCLM83-07
-Plastic Garbage Bags
. The following quotations have been received for the supply of plastic
garbage bags for Authority operations: 20,000 26" x 36" x 2mil,
5,000 35" x 50" x 3mil, and 10,000 22" x 24" x 2mil bags. Quotations
include all taxes:
Poly Tarp Co. $ 2,896.22
Apache Plastics 2,949.57
Fenton Products 3,167.63
F&B Industrial Hardware 3,520.73
Res. #24 Moved by Mrs. L. Hancey
Seconded by J.S. Scott
THAT the quotation of Poly Tarp Co for the supply of 20,000
26" x 36" x 2mil and 5,000 35" x 50" x 3mil, and 10,000 22" x 24" x 2mil
plastic garbage bags, in the sum of $2,896.22, including all taxes, be
accepted; it being the lowest quotation received.
CARRIED;
24. QUOTATION tCLM83-08
-Conservation Areas' Operations: Paper Products
The following quotations have been received for the supply of paper
products for use in Conservation Areas and other facilities operated by
the Authority. The quotations cover 500 cases of rolled toilet paper,
100 cases of single-fold towel, and lOO cases rolled towel. The prices
include 7% provincial Sales Tax. .
Fenton Products $l2,761.89
Kimberley Clarke l3,056.14
G.H. Wood 15,050.62
Res #25 Moved by Mrs. L. Hancey
Seconded by J S Scott
THAT the quotation of Fenton Products for the supply of 500 cases rolled
toilet paper, lOO cases single-fold towel, and lOO cases rolled towel, in
the sum of $12,761.89, including 7% Provincial Sales Tax, be accepted; it
being the lowest quotation received
CARRIED;
25 KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Exhibit Proposal
Res. #26 Moved by: E.V. Kolb
Seconded by Ms. S. Nimmo
THAT the contract for the design, development, fabrication, and installation
of indoor exhibits for the Renewable Energy Theme Program at the Kortright
Centre for Conservation be awarded to the firm Renewable Energy in Canada,
at a cost of $40,000.00
CARRIED;
26 REPORT #5/82 - FOOD SERVICES SUB-COMMITTEE
Res. #27 Moved by E.V Kolb
Seconded by: W G. Barber
THAT Report #5/82 of the Food Services Sub-Committee be received;
AND FURTHER THAT the following action be taken
-19- B-19
(a) The salary schedule for Supplementary Service staff, as appended as
as Schedule nCn of these Minutes, be approved~
(b) The Authority's Personnel Manual be amended accordingly~
(c) The 1983 Budget Estimates for Authority Food Services for the
period March 1st to December 31st, 1983, as appended as Schedule nOn
of these Minutes, be approved~
(d) The 1983 Budget Estimates for Authority Food Services be included
in the 1983 Budget Estimates of the Authority.
CARRIED~
27. 1983 SALARY INCREASES TO INFORMATION
AND EDUCATION EDUCATIONAL ASSISTANTS
Res. t28 Moved by: E.V. Kolb
Seconded by: S.A. Macpherson
THAT the 1983 salary range for Educational Assistants be established at
$40.00-$45.00-$51.50/day~
AND FURTHER THAT the 1983 salary range for Education Program Coordinators
be established at $58.80-$64.00/day. .
CARRIED~
28 EXPERIENCE PROGRAM
Res. 129 Moved by: H.C. Lawrie
Seconded by: S.A. Macpherson
THAT the staff communication, together with the copy of letter dated
January 24, 1983, to The Honourable Margaret Birch, Provincial Secretary
for Social Development, from J R. Powell, Executive Director, Association
of Conservation Authorities of Ontario, having regard to the Experience
Program, be received for information.
CARRIED;
29. ONTARIO NATURAL HERITAGE LEAGUE
Res #30 Moved by: . M.W.H. Biggar
Seconded by: S.A. Macpherson
THAT the staff communication, together with correspondence dated January 31,
1983, from J R. Powell, Executive Director, Association of Conservation
Authorities of Ontario, to Chief Administrative Officers of the Ontario
Conservation Authorities having regard to the Ontario Natural Heritage
League, be received and filed.
CARRIED;
30 ORIENTATION SEMINAR
Res #3l Moved by E.V. Kolb
Seconded by: S A. Macpherson
THAT an Orientation Seminar be held for Authority Members on Tuesday,
February 22, 1983, at the Authority Office, 5 Shoreham Drive, Downsview,
commencing at 5 30 pm. ~
AND FURTHER THAT per diem and mileage be paid for attendance of members
at the seminar
CARRIED;
31 1983-l984 APPOINTMENTS TO THE ASSOCIATION OF CONSERVATION
AUTHORITIES OF ONTARIO BOARD OF DIRECTORS
Res #32 Moved by S.A Macpherson
Seconded by W G. Barber
THAT Mrs Florence Gell, Chairman, be designated the representative of
The Metropolitan Toronto and Region Conservation Authority on
The Association of Conservation Authorities of Ontario Board of Directors
CARRIED;
32 TERMINATION
On motion, the meeting terminated at 1 00 P m , February 16.
Mrs. Florence Gell W E. Jones
Cha 1 rman Secretary-Treasurer
KC.
- .,
-
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
1983 BUDGET ESTIMATES
Authority
February 25, 1983
en
0
t1:
trl
0
Q
fu
II1
. I
", '"
= 0
1983 BUDGET ESTIMATES
SOURCES OF FUNDS ALLOCATION OF FUNDS
0 percent Operations
79
'c. S3,91O,OOO
percent Capital 21%
.21'
.fJt
~
'01
~~
...,2,.0
o 0
0
16%
$2,950,000
TItE HETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
1983 PRELIHINARY BUDGET ESTIHATES
I N D E X
Pagels) Pagels)
BUDGET REPORT & PROVINCIAL FUNDING 1-1-8 Erosion Control - York
- Program Description V-IO
HUNICIPAL LEVIES AND BASIS OF APPORTIONMENT 11-1-3 - Program Budget Summary V-ll
Erosion Control - Durham
BUDGET SUHHARY II 1-1-4 - Program Description V-12
- Program Budget Summary V-13
THE FINANCE & ADMINISTRATION DIVISION Planning & Remedial Heasures
- Division Description - Goals & Responsibilities IV-l - Program Description V-14
- 1982 Achievements - 1983 priori ties IV-2 - Program Budget Summary V-IS
- Division Budget Summary IV-3 Haintenance - Small Dams, Channels, Erosion
- Administration - Program Description IV-4 Control Structures - Program Description V-16
- Program Budget Summary IV-5 - Program Budget Summary V-17
- General Expenses - Program Description IV-6 Rive~ Forecasting Operations - Halntenance
- Program Budget Summary IV-7 Water Control Structures
- Budget Revenue Detail IV-8 - Program Description V-18
- Property Acquisition - Haintenance & - Program Budget Summary V-19
Hanagement - Program Description IV-9 - Waterfront - Division Budget Summary V-20
- Program Budget Summary IV-IO Administration - Program Description V-21
- Vehicle & Equipment Purchases - New & - Program Budget Summary V-22
Replacement - Program Description IV-II Shoreline Hanagement - Program Description V-23
- Program Budget Summary IV-12 - Program Budget Summary V-24
Lake Ontario Waterfront Development
THE WATER RESOURCE DIVISION - Program Description V-2S
- Division Description - Goals & Responsibilities V-I - Program Budget Summary V-26
- 1982 Achievements - 1983 priorities V-2
- Flood Control - Division Budget Summary V-3 THE CONSERVATION LAND HANAGEMENT DIVISION
Administration - Program Description V-4 - Division Description - Goals & Responsibilities VI-1
- Program Budget Summary V-5 - 1982 Achievements - 1983 priorities VI-2
Erosion Control - Metropolitan Toronto - Division Budget Summary VI-3
- Program Description V-6 - Program Administration - Program Description VI-4
- Program Budget Summary V-7 - Program Budget Summary VI-S
Erosion Control - Peel - watershed Recreation - Planning
- Program Description V-8 - Program Description VI-6
- Program Budget Summary V-9 - Program Budget Summary VI-7
- 2 -
Page(s) Page(s)
TilE CONSERVATION LAND MANAOEMENT DIVISION contd - Community Relations - Information
- Watershed Recreation General - Program Description VII-6
Development - Program Description VI-8 - Program Budget Summary VII-7
- Program Budget Summary VI-9 I Resource Management Programs
Operations and Maintenance - Program Description VII-8
- Program Description VI-lO - Program Budget Summary VII-9
- Program Budget Summary VI-ll Planning/Marketing Analysis
Program Budget Revenue Detail VI-12 - Program Description VII-lO
- Conservation Land Management - Program Budget Summary VII-ll
Land Management - Program Description VI-13 - Communit Relations - Conservation Education
- Program Budget Summary VI-14 Superv a on, Operat ona & Ma ntenance
Conservation Planning - Program Description VII-12
- Program Description VI-IS - Program Budget Summary VII-13
- Program Budget Summary VI-16 Kortright - Program Description VII-14
Glen lIaffy Fish Rearing - Program Budget Summary VII -15
- Program Description VI-17 Development - Program Description VII-16
- Program Budget Summary VI-18 - Program Budget Summary VII-17
Non-Revenue Properties
- Program Description VI-19 THE IIISTORICAL SITES DIVISION
- Program Budget Summary VI-20 - Division Description - Ooals & Responsibilities VIII-l
- 1982 Achievements - 1983 priorities VIII-2
- Division Budget Summary VIII-3
TilE INFORMATION & EDUCATION DIVISION - Herita~e - Program Description VI II-4
Admin stration
- Division Description - Goals & Responsibilities VII-l - Program Budget Summary VIII-S
- 1982 Achievements - 1983 priorities VII -2 Black Creek Pioneer Village - Operations &
- Division Budget Summary VII-3 Maintenance - Program Description VIII-6
- Program Administration - Program Description VII-4 - Program Budget Summary VIII-7
- Program Budget Su~nary VII-S Education Program - Program Description VIII-8
- Program Budget Summary VII I -9
Capital Development - Program Description VIII-IO
- Program Budget Summary VIII-ll
Page 1-1
1983 BUDGET ESTIHATES
Authority Purpose, Achievements and Objectives
The Hetropolitan Toronto and Region Conservation Authority adopted a comprehensive Watershed Plan on December 5, 1980, to
establish long-range goals in nine program areas specific to the 3467 square kilometres within Authority jurisdiction. The
adoption of the Plan is in compliance with the direction of the Conservation Authorities Act to undertake a program designed
to further the conservation, restoration, development and management of natural resources and of the Province of Ontario to
study and investigate the watershed and prepare and file with its member municipalities and the Minister of Natural Resources,
a Watershed Plan.
The Watershed Plan has been filed with, and concurred in by, the Authority's member municipalites and the Director, Central
Region, Hinistry of Natural Resources. The Authority, in the Plan, has identified the river valleys, the Lake Ontario
shoreline and the headwaters of the Oak Ridges interlobate moraine and the Niagara Escarpment as the major resources to which
its programs are applied.
The Watershed Plan is comprised of nine (9) interrelated programs:
The basic requirement of the Authority is to provide protection to human life and property from the hazards of flooding and
erosion. The Flood Control Program and three complementary programs, Erosion and Sediment Control, Storm Water Hanagement and
Conservation Land Hanagement, establish the means to accomplish this objective and recognize the relationships between rural
and urban drainage, erosion and sedimentation, and flooding.
Flood Control Program - Provides for remedial measures, land acquisition and the administration of regulatory measures to
maintain flood plains unobstructed to ensure the passage of flood flows.
I Erosion and Sediment Control Program - Provides for corrective works and the administration of regulatory measures to protect
life and property.
Storm Water Hanagement Program - Establishes a basis for co-operative action by the Authority and its member municipalities
with respect to water management problems and the preparation of master drainage plans.
Conservation Land Hanagement Program - Promotes conservation on private and public lands by providing reforestation, habitat
improvement, stream improvement and a conservation planning service.
Land Acquisition Program - Provides for the acquisition of flood plain and valley lands, waterfront lands and environmentally
significant lands to ensure proper conservation land management. The hectares of land acquired by the Authority are
being managed to achieve the objectives of the Watershed Plan.
Lake has two components, Shoreline Hanagement to reduce the hazards of
and Development to create water-oriented recreation opportunitie~.
~
Page 1-2
Watershed Recreation Program - Enables the development and operations of recreation areas for public use and enjoyment, a
valuable ancillary benefit on conservation lands
Heritage Conservation Program - Recognizes the special contribution that an historical perspective gives to the understanding
of resource management.
Community Relations Program - Establishes the means by which the Authority can communicate with the community in order to gain
understanding and acceptance of its conservation programs.
The 1983 Budget Estimates derive from the Watershed Plan reflecting a strong orientation to Water and Related Land Management
Programs and emphasizing planning, regulatory and environmentally acceptable solutions to water management problems. The
Budget proposals also address a number of administrative matters:
- disposition of municipal levies on hand
- provision for gapping, set at 1\ of full-time wages, salaries and benefits
- identification and allocation of interest income.
The adoption of this Budget will not enable the Authority to maintain the level of service provided to the community in 1982
and will not enable the Watershed Plan objectives to be implemented at the rate anticipated on adoption.
Format of Presentation
.
The 1983 Budget Estimates are based on the same program management format as the 1982 budget format. The format is designed
to identify more clearly the programs adopted by the Authority in its Watershed Plan. In addition, the budget estimates are
organized into management units to more clearly identify and manage the Authority programs. The principles of program budget
management have been used to develop the 1983 Budget Estimates.
There are five major types of provincial grants available through the Ministry of Natural/Resources to Conservation
Authorities:
1. Administration
2. Water and Related Land Management
3 Conservation and Recreation Land Management
4. Special Projects and Programs
5. Supplementary Grants (not applicable to MTRCA).
Commencing in the 1983 budget year, the Ministry of Natural Resources recommends the payment of grants to authorities based on
a priority ranking system, using technical criteria, which compares the 'need' for individual projects in a province-wide
matrix.
Page 1-3
Authority Programs
l. Finance and Administration
(a) Program Administration
(b) General Expense
(c) Property Acquisition and Maintenance and Management
2. Water and Related Land Management - Flood Control
.
(a) Program Administration
(b) Erosion and Sediment Control - Metropolitan Toronto
- Peel, York and Durham
(c) Flood Control - Planning and Remedial Measures
- River forecasting operations, Maintenance of Water Control Structures
- Maintenance, Small Dams, Channels, Erosion Control Sites
3. Special Projects - Lake Ontario Waterfront Development
(a) Program Administration
(b) Waterfront Development
(c) Shoreline Management: Remedial works, and management of works.
4. Conservation Land Management
(a) Program Administration
(b) Watershed Recreation - Planning
- Conservation Area Development
- Operations and Maintenance
(c) Conservation Land Management - Planning
- Conservation Management
- Conservation Management (Flsh Rearing)
- Operations and Maintenance
Page 1-4
5. Information and Education
(a) Program Administration
(b) Community Relations - Information - General
- Resource Management
- Planning, Market Analysis
- Conservation Education - Supervision, Operations, Maintenance
- Supervision, Operations, Maintenance (Kortright)
(c) Conservation Education Development
6. lIistorical Sites
(a) Program Administration
(b) Operations and Maintenance
(c) Capital Development
Expenditures on administration, operations and maintenance, and current programs comprise the Authority's General Levy on all
participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario.
Expenditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in specific
projects. Certain expenditures from special revenues and levy on hand are recommended.
tand Acquisition Project, 1982-1984
This froject was adofted br the Authority and approved by the municipalities on the basis of a 55' grant and all member
munic palities benef ting n proportion to their equalized assessment. The Authority plans an expenditure of $550,000. for
1983, of which $247,500, being the municipal share, will be funded from levy monies on hand.
Lake Ontario Waterfront Development Project, 1983
This project was adopted br the Authority and approved by the municipalities on the basis of a 50' grant and all member
municipalities benefiting n the same proportion as that determined for the 1977-1981 project. The budget estimates for this
project are found in the Finance and Administration (Waterfront Open Space Land Acquisition and Hazard Land Acquisition) and
the Water Resource Division sections of the budget document.
The Shoreline Management component is budgeted on the basis of a 55' grant for 1983, as directed by the Ministry of Natural
Resources.
Page 1-5
Projects for Erosion Control and Slope Stabilization in the Municipality of Metropolitan Toronto and the Regional
Municipal ities of Peel, York and Durham, 1982-1984.
These projects were adopted by the Authority and approved by the municipalities on the basis of a 55' grant and each
municipality benefiting for the works carried out in the municipality. The annual municipal funding requirement is:
Metropolitan Toronto 173,250
Peel 13,500 .
York 9,000
Durham 2,250
$ 198,000
These projects are budgeted for in 1983 as submitted.
Project for Channel Improvements - Main Humber River,
Village of Bolton and Town of Caledon, 1982-1983.
All approvals are in hand for the 1982 project and, due to increased costs, an addendum to the project has been submitted for
approval. In both instances, the project will be funded by the Province of Ontario.
The 1983 Levy
The apportionment of the 1983 municipal levy is based on the 'discounted' equalized assessment in the Authority, in accordance
with information supplied to all Conservation Authorities by the Ministry of Natural Resources.
In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied an
amount equal to 100\ of the 1982 taxes paid by the AuthorIty for revenue producing conservation areas within those
mun icipaU ties. within Metropolitan Toronto, Authority lands are not subject to taxation.
Provincial Funding
The provincial grant structure used in these estimates is based on the fOllowing approved percentages:
Administration 50\
Water and Related Land Management 55\
Conservation and Recreation Land Management 50\
Waterfront Plan (excluding shoreline management) 50\
Shoreline Management 55\
Page 1-6
The Authority has obtained approval for the following level of funding from the province of Ontario to finance the programs
set forth in the 1983 Budget Estimates.
Rate Requested
of Grant 1983 Approved 1983 Actual 1982
, $ $ $ $ $
ADMINISTRATION
A 1 to A6 inclusive 50 689,640 690,000 656,780
==;::rCl==~ Q;a=:::;aIZC:Z_ l:Ia=:;;Z==2:
WATER & RELATED LAND MANAGEMENT
PROGRAM ADMINISTRATION
Flood Control - Wages, benefits & expenses 55 400,900 367,147
Operation and maintenance of water control 55 200,000 149,409
Conservation services 55 130,000 132,795
Forest management 55 31,525
Community relations 55 99,000 100,984
Taxes and insurance 55 l5l,00~ 111,925
SUB TOTAL 999,033 1,012,425 862,260
SURVEYS & STUDIES
Master drainage planning 55 11 , 000 6,134
preliminary engineering 55 39,765
Environmental studies 55 21,562
SUB TOTAL 32,175 11,000 67,461
Page 1-1
Rate Requested
of Grant 1983 A~proved 1983 Actual 1982
\ $ $ $ $
WATER , RELATED LAND MANAGEHENT (CONTO)
CAPITAL
Interim Water , Related Land Management Project
Bolton channelization * 530,100 352,000
lIighland Creek 55 52,174
Oak Ridges 55 24,140
Flood control hazard land acquisition 55 150,000 312,102
Waterfront hazard land acquisition 55 339,011
Erosion Control 55 194,525 251,350
SUB-TOTAL 1,335.,850 814,625 1,352,583
Floodline mapping 90 31,428
Waterfront shoreline management 55 210,000 205,300
Keating Project 55 23,171
SUB-TOTAL 320,315 270,000 266,505
TOTAL WATER AND RELATED LAND MANAGEHENT 2,681,433 2,168,050 2,548,809
=-=::II=*==-C= .::118=.1:;1=_10= CI=:a"~ZS==Q
* Funded 100\ provincially through grants and funds on hand (escrow) from the sale of Authority lands.
,
Page 1-8
Rate Requested
of Grant 1983 Approved 1983 Actual 1982
, $ $ $ $ $
CONSERVATION , RECREATION LAND HANAGEHENT
PROGRAH ADHINISTRATION .
Salaries, wages , expenses * 50 750,000 721,756
Information and interpretation 50 28,140 38,047
Taxes and insurance 50 40,460 28,922
SUB-TOTAL 843,777 818 , 600 788,725
SURVEYS AND STUDIES
Boyd Master Plan 50 37 ,500 38,229
SUB TOTAL 37,500 37,500 38,229
CAPITAL
Conservation area development 50 80,000 67,234
Waterfront open space land acquisition 50 166,102
Waterfront development 50 632,000 557,015
SUB TOTAL 941,205 712,000 790,351
TOTAL CONSERVATION , RECREATION LAND MANAGEMENT 1,822,482 1,568,100 1,617,305
~g~_._ClIJ:lCI a=_acaa:::lla DIZ;:ICI.a:a:amCl
TOTAL FUNDING 5,199,555 4,426,150 4,822,894
..==--==ut:lu=- aaaz:r=mm== a=-===-====
The Authority has received H.A.20/83 authorizing grants of $4,426,150, as outlined above. The difference between the level of
provincial funding requested and that approved will be requested during 1983. Works eligible for grant will not proceed
unless grants or their equivalent, to match levy funds, are made available.
* includes divisional administration budgets for Waterfront, Conservation Land Hanagement, Information and Education and
Historical Sites.
Page II-I
'l1IE ME:l'ROOOLITAN TOROtll'O AND IUXiIOO COOSERVATIOO AIJI'HORITY
BASIS <F APOORTIOtIimT - HlINICIPAL LEVY
BASED ON 'l1tE LATEST EXlUALIZED ASSESSiEm' FIWRES (DISCOONTID) AVAILABLE TO THE AU'DIORITY**
Discounted \ of Discounted FlpJalized Population
FlpJali zed I".m icipali ty Assessment Total In
tt.micipalitv Assessment In l\uthoritv In Watershed Pooolation l\uthoritv
1,000's of $'s 1,000's of $'s
Adjala Township 64,667 8 5,173 3,899 312
Durham, Regional Hmiclpality of 1,277,001 * 1,002,050 75,909 61,103
Metropolitan Toronto 48,114,479 . 100 48,114,479 2,140,347 2,140,347
K>no Township 91,590 5 4,580 4,126 206
Peel, Regional MUnicipality of 11,639,388 * 4,923,577 506,421 219,462
York, Regional MUnicipality of 6.026,858 * 5,286,715 202.536 170.214
67,213,983 59,336,574 2.933.238 2,591,644
ANl\LYSIS <F IUXiIONAL HllUCIPALITIES *
Durham, Regional Hmicipality of
Ajax Town 422,170 86 363,067 25,660 22,068
Pickering Town 627,060 95 595,707 38,799 36,859
Uxbridge Town 227.771 19 43,276 11.450 2,176
1. 277 001 1,002,050 75,909 61,103
Peel, Regional ttmicipality of
Brampton, City of 3,144,226 63 1,980,863 154,981 97,638
Hississauga, City of 7,861,929 33 2,594,436 324,853 107,201
Ca1edon Town 633 233 55 348,278 26,587 14 , 623
11,639,388 4,923,577 506,421 219,462
York, Regional Hmiclpality of
l\urora Town 329,525 4 13,181 16,466 659
Markhan Town 2,403,017 100 2,403,017 81,932 81,932
Richnond lUll Town 931,483 99 922,168 38,488 38,103
Vaughan Town 1,621,307 100 1,621,307 36,815 36,815
Whitchurch-Stouffvil1e Town 332,271 43 142,877 13,551 5,827
King Township 409,255 45 184,165 15.284 6,878
6,026,858 5,286,715 202.536 170, 214
** As provided by the Hinistry of Hmiclpal Affairs arxl Ilousing.
83.02.10
.
Page 11-2
'l1IE HETROOOLITAN TOR<Nl'O AND IUXiION CONSERVATION AU'l1IORITY
1982 LEVY A~RTIOIt1mr WING DISCOUNTED fX)UALIZED ASSE:>Simr*
General and Capital Levy Waterfront Project
excluding Waterfront
Discounted Assessnent
Discounted Assessment Proportionate 95\ HetrojOurham Proportionate
in Watershed Factor 5\ IIdja1a!Hono/Peel/york Factor
(l,ooO's of $'s) (l,OOO's of $'s)
.
Adjala 5,173 .00008718064 5,173 .00002530811
Durham
Ajax 363,067
Pickering 595,707
Uxbridge 43,276
1,002,050 1,002,050 .01688756078 1,002,050 .01938140825
Metro 48,114,479 .81087389710 48,114,479 .93061859175
Mono 4,580 .00007718679 4,580 .00002240695
Peel
Brampton 1,980,863
Hississauga 2,594,436
Caledon 348,278
4,923,577 4,923,577 .08297710279 4,923,577 .02408784403
York
l\1uora 13, 181
Markham 2,403,017
Richoorxl IJill 922,168
Vaughan 1,621,307
Whitchurch-Stouffvi1le 142,877
King 184,165
5,286,715 5,286,715 .08909707190 5,286,715 .02586444091
59,336,574 1.00000000000 59,336,574 1.00000000000
* As provided by the Hinistry of ttmicipal Affairs and Ilousing.
83.01.31
Page 11-3
TIlE HETROroLITAN TORONTO AND IUXiIOO CONSERVATION AIJI'lIORITY
APOORTI<H1ENI' <F 1983 LEVIES
G:NERAL PROJECTS - WATERSHED PLAN PROJECTS - WATERFR<HI'
.
1 9 8 3 GENERAL LEVY WATERSHED PROJECTS SPECIAL WATERFRONT
Before Tax Total Inc. 1982 General Inc Capi tal Capi tal Highland Visitors' Guild Developnent Shoreline
Tax Adjll5t Adjll5bnent Tax Adjll5t Tax Adjll5bnent All Ben. Ben .ttm. Total Creek Centre Inn etc. Ha'1anent
$ $ $ $ $ $ $ $ $ ~ $
IIdjala 348 348 375 21 21 28
Durham 67,403 41,465 108,868 106,512 4,180 2,250 6,430 11,462 21,174
,
Metro
Toronto 3,236,427 3,236,427 3,143,693 200,691 173,250 373,941 67,500 250,000 1,016,701 262,125
.K>no 308 308 328 19 19 24
Peel 331,185 98,751 429,936 418,957 20,537 13,500 34,037 26,316
York 355,612 28,074 383,686 338,746 22,052 9,000 31,052 28,257
247,500 198,000 445,500
3,991,283 168 290 4.159,573 4.008.6ll (247,500) (247.500) 67,500 11,462 250,000 1.092.500 262,125
NO'fES TO LEVY SHEET
1. a) $247,500 of 1982 capital surplus has been credited to the 1983 Watershed Projects, capital all benefiting municipalities.
b) The IJighland Creek project has been included with Metro, the benefiting municipality, for an estimated net expenditure in 1983 of $67,500.
c) The Guild Inn takeover is estimated to cost Metro, the benefiting mlIlicipality, approximately $250,000 in 1983.
2. 25th Year Project, Black Creek pioneer Village Visitors centre: 'lhis project is to be financed as follows:
Hanber Municipalities' Special Contribution $ 588,538
Regional Municipality of Durham 11,462
Wintario 600,000
Metro Toronto and Region Conservation Foundation 600,000
$1,800,000
=======::::z=
83.01.31
Page 111-1
LECEND: CUrrent Items - II
Capital Items - 00 BUDGET SlHtARY
1983 BlDGE'f SOURCES (F FINAtCING 1982 BlDGET 1982 AC'I'UAIB
ACTIVITY NET PROVItCIAL MUNICIPAL
EXPEtI>ITURES REVENUES EXPEWITURES GRANT LEVY O'DJER EXPEWITURES REVENUES EXPENDITURES REVENUES
$ $ $ $ $ $ $ .~. $ $
FINl\tCE & AL't1INISTRATION
Administration .. 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429
General Expenses .. 265,000 172,000 93,000 18,000 75,000 217,500 160,000 346,680 224,443
Property Acquisition -
Haintenance Management
Flood control 152,500P
Land Acquisition 00 550,000 550,000 150,000 247,500 500,000 604,913
Waterfront llazard
Land Acquisition 00 325,000 325,000 146,250 178, 750P 325,000 332,204
I
Waterfront
Open Space Land Acqu 'n 00 300,000 300,000 150,000 150,000P 707,500 678,034
Legal Costs 11 , 000
Regulation Enforcement .. 11,000 6,050 4,950 15,000 8,476
Water & Related
Taxes .. 260,245 260,245 143,135 117,110 234,000 194,350
Insurance .. 14,300 14 , 300 7,865 6,435 12,800 9,150
Conservation & Recreation
TaxeS .. 67, 200 6'7, 200 33,600 33,600 60,000 48,690
Insurance .. 13,720 13,720 6,860 6,860 12,200 9,154
Vehicle & Equipment
Purchases .. 280,730 280,730 13,600 267,130 242,025 208,488
P -Provincial cash flow to be requested.
83.02.17
Page 111-2
BlDGET S{HtARY
1983 BUDGET SOURCES <F FINl\tCING 1982 BlDGET 1982 AC'I'UALS
l\CTIVITY NET PROVIOCIAL KJNICIPAL
EXPEmITURES REVENUES EXPENDITURES GWfI' LEVY OTHER EXPENDITURES REVEtIJES EXPENDITURES REVENUF..8
~ ~ Ii Ii ~ Ii ~ Ii Ii Ii
WATER RESOURCES - FLOOD
CONl'ROL
Program Administration .. 743,652 743,652 394,850 337,681 11,121 680,640 690,282
Erosion - MetI"O 00 396,500 11,500 385,000 179,575 173,250 32,175P 415,000 15,000 409,741 5,781
Erosion - Peel 00 35,600 5,600 30,000 10,000 13,500 6,SOOP 32,000 2,000 30,209
Erosion - York 00 23,500 3,500 20,000 4,950 9,000 6,05OP 21,500 1,500 22,753 4,200
EI"osion - Durham 00 5,000 5,000 2,250 2, 750P 5,300 300 4,892
Flood Control -
Planning .. 58,500 58, 500 11,000 26,325 21,175P 171,680 163,630
Ranedia1 Works 00 1,285,000 1,285,000 530,100 67,500 82,500P 725,000 737,320
604,900
Flood Control -
Maintenance
SnaU Dams aM .
Channels II 244,000 244,000 134,200 109,800 155,000 156,027
Flood Control -
River FOrecasting .. 119,637 119,637 65,800 53,837 121,000 115,629
.
WA'l'ER RESOURCES -
WATERFRONT
Adninistration 00 211,239 2ll,239 105,620 105,619 253,786 256,949
Lake Ontario Haterfront 00 1,531,261 150,000 1,381,261 632,000 690,631 58, 630P 1,090,671 1,114,029
Shoreline Hanaganent 00 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600
alNSERVATION LAND
Hr\NAC>>tENl'
Program Administration .. 673,204 673,204 336,~2 336,602 644,300 656,675
P - provincial cash flow to be requested.
83.02.17
Page 111-3
BWGET SlIflARY
1983 BlDGET SOURCES <F FINAOCING 1982 BlDGET 1982 AC'lUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES rnANT LEVY O'l1IER EXPENDITURES REVENUES EXPEmITURES REVENUES
~ $ ~ $ ~ ~ ~ ~ 1J ~
Watershed Recreation
Planning II 75,000 75,000 37,500 37,500 120,000 76,457
Developnent .. 181,960 181,960 80,000 85,490 16,470 627,000 148,928
Operations II 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218,076 999,040
Conservation Land
Managanent II 469,181 134,000 335,181 166,775 168,406 329,000 44,000 398,374 108,103
INFORMATION & IDnTION
Program lIdministration " 315,420 315,420 157,710 157,710 268,385 253,672
CarrolIli ty Relations Inform
Support " 64,842 64,842 32,421 32,421 59,990 65,528
General " 80,127 80, 127 43,170 36,957 74,100 63,830
Resource M]t. Programs " 11,000 11,000 6,050 4,950 10,000 9,894
Planning/Market Analysis" 90,243 90,243 90,243 125,000 124,260
CarrolIlity Relations Etlocn.
Support " 35, 108 35,108 11,554 17,554 32,111 33,312
Supervision Operation
& Haintenance " 1,273,083 1,136,300 136,783 58,780 78,003 1,037,764 873,800 1,223,822 1,067,965
Supervision Operation
& Maintenance -
Kortright " 442,000 264,850 177,150 19,140 120,460 37,550 393,000 232,150 400,531 219,918
I Developnent " 114,800 114,800 9,600 105,200 180,500 36,077
83.02.17
Page 111-4
BlDGET SlHiARY
1983 BlDGET SOURCES <F FlHAOCING 1982 BWGET 1982 AC'lUALS
ACTIVITY NET PROVIOCIAL KJN IC I PAL
EXPENDI'roRES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDI'roRES REVENUES EXPEtmI'roRES REVEWES
Ii Ii $ $ $ ~ Ii Ii Ii (I
IUSTORICAL SITES
Progr~n Administration .. 273,122 273,122 94,843 178,279 248,700 260,599
Operations "
Haintenance .. 1,487,200 1,025,000 462,200 260,200 202,000 1,492,000 1,040,500 1,458,808 925,016
Edocational Programs .. 157,500 163, 500 (6,000) (6,000) 174,450 179,700 127,035 147,697
capital Developnent 00 1,995,000 1,995,000 1,995,000 1,930,000 89,902
CURRENT 11,350,774 3,911,650 7,439,124 2,543,905 4,159,573 735,646 11,255,411 3,530,150 10,854,863 3,692,182
CAPITAL 7,240,600 170,600 7,070,000 1,882,245 1,620,125 3,567,630 6,428,800 18,800 4,691,546 9,981
1983 TOTAL 18,591,374 4,082,250 14,509,124 4,426,150 5,779,698 4,303,276 17,684,211 3,548,950 15,546,409 3,702,163
1982 TOTAL 17,684,211 3,548,950 14,135,261 4,854,435 5,471,611 3,809,215
-I-.
83.02 17
.
Page ~-l:.
1983 BUDGET ESTIMATES
TilE FINANCE AND ADMINISTRATION DIVlSI~
To support goalS of the Authority. the re.poeeibiiiti.e of U,' oi.ieioe encompae. finenciai
management and monitoring of financial procedures. compilation of budget, multi-year forecast and
pro.ieion of such financiai data and report in. 00 required.
The oi.iaion ia reepon.ible fnr acquieitiona and ..na.e.ent of property. ..ne.e..nt of Authority
legal services. ..na.e..nt of Aethority'e ad.inietration officee an' .roun'.' and provision of
...iniatrati.e .er.ice. to all .i.ieion. of the Auu~rity an' ..na.e.ent of Authority per.onnei
services.
The secretary-TreaSurer is required to record the resolutions. decisions and other proceedings of
the Authority an' to keep the ori.in,'a of ,11 .inutea of the Autbority an' ite bOar'. and
committees
82 09.22
.
Pa~V-2
1982 ACIII EVEMENTS
. the Accounting Section continued the development and implementation of a computer-based financial management and budget
reporting system
a Personnel Officer was employed, reporting directly to the General Manager
the updating of the Authority's Personnel Policies Manual was completed
1983 PRIORITIES
In general, the objectives for 1983 relate to further improvement in performance for services presently provided, and
provision of new and expanded services within the available resources In particular, the Accounting Section will continue
to develop and improve financial reporting procedures, including revision of purchasing policy to conform to computer
accounting.
.
82 09 22
Page IV-3
1983 BlDGET ESTIMATES
DIVISION Finance , hdminist~ation
1983 BmGET OOURCES (F FINAtCING 1982 BtIXE'I' 1982 AC'lUALS
l'R00Wi NET PROVIOCIAL HllN IC I PAL
EXPENDI~ REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEWES EXPENDITURES REVmlIES
$ $ $ $ $ $ $ $ $ $
Program
Administration 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429
General Expenses 265,000 172,000 93,000 - 18,000 75,000 217,500 160,000 346,680 224,443
property
Acquis tion -
Haintenance ,
Managanent 1,541,465 1,541,465 347,510 465,205 481,250P 1,866,500 1,884,971
247,500
Vehicle ,
Equipoont
Purchases 280,730 280,730 13,600 267,130 242,025 208,488
T<YrAL 3,467,195 172.000 3,295.195 1. 037 .510 1.186.805 1.070.880 3.639,585 160.000 3.788.568 224.443
P - provincial cash flow to be requested.
83.02.17
.
Page IV-4
1983 BUDGET ESTIHATES
DIVISION: Finance and Administration
PROGRAH: Admin istrat ion
PURPOSE:
To provide the administrative and financial services of the Authority.
1983 OBJECTIVES:
- Continuation of general administration and financial support services for all Authority programs, as well as salaries and
expenses for the Chairman and Vice Chairman. The salaries of the General Hanager, Deputy General Hanager,
Secretary-Treasurer, associated secretarial staff, and the staff of the Finance and Administration Division, which includes
Land Acquisition, Personnel, Finance and general office administration, are charged to this program. The payment of members'
per diem and kilometers and the Authority meeting expenses are included in the budget. The cleaning and maintenance of the
administration headquarters is also funded.
FUNDING:
This is a shared program, financed by a grant from the Province of Ontario and the general levy on all participating
municipal i ties.
FINANCIAL COMHENTS:
In 1983, as in 1982, employee benefits and Administrators' salaries are charged to each program.
Salary increases are provided for on the basis of 5\ economic.
OBJECTIVE CLASSIFICATIONS:
Hembers Supplies (,
Fringe Salaries Transportation (, Equipment
Salaries Benefi ts (, Expenses Communication Services (Office) TOTAL
651,175 96,505 94,170 148,600 319,550 70,000 1,380,000
83.02 17
Page IV-S
1983 BIDGE'l' ESTIMATES
DIVISION: Finance and Administration
Program: lIdministration
1983 BI.IX3ET SOURCES <F FINAtCING 1982 BUOOBT 1982 ACTUALS
ACTIVITY NET PROVItCIAL K1NICIPAL
EXPENDITURES RE\IEIlJES EXPENDITURES rnANT LEVY OTIfER EXPEWI'IURES REVEWES EXPENDITURES REVENUES
Salaries 651,175 651,175 325,588 325,587 655,772 658,389
FriBJe Benefits'
Separation 96,505 96,505 48,252 48,253 114,323 86,595
Members' Salaries
, Expenses 94, 170 94, 170 47,085 47,085 89,325 94,358
Transportation ,
CQIIlIl.ll icat i on 148,600 148,600 74,300 74,300 155,000 126,903
Services 318,550 318,550 159,275 159,275 218,140 293,387
Supplies (Office) 60,000 60,000 30,000 30,000 62,000 61,469
Equipmt. (Office) 10,000 10,000 5,000 5,000 8,000 22,136
safety
Comn Uee 1,000 1,000 500 500 1,000 681
Biennial
Conference . 10,000 4,505
TOTAL 1,380,000 1,380,000 690,000 690,000 1,313,560 1,348,429
83 02.17
.
Page IV-6
1983 BUDGET ESTIMATES
DIVISIONI Finance and Administration
PROGRAM I General Expenses
PURPOSE I
To provide for a variety of support costs for which no Provincial Grant is available
1983 OBJECTIVES I
- To fund the maintenance of revenue producing properties and other general maintenance
_ To fund the public liability insurance on vehicles and equipment.
_ To fund the Authority's share of vehicles and equipment.
- To fund taxes and insurance for revenue producing properties
FUNDING I
Since no provision for these items is made in the Ministry of Natural Resources grant structure, the funding is entirely from
municipal levy and program revenues consisting of rental income It should be noted that no provision has been made for the
contingency of a deficit in 1982
FINANCIAL COMMENTSI
OBJECTIVE CLASSIFICATIONS I Haterials
Salaries Supplies " Services Interest
" Wages Utilities " Rents Costs Insurance Taxes TOTAL
$ 10,000 24 , 000 73 , 000 30,000 23,000 105,000 265,000
82 00 09
Page IV-1
1983 BlIlGET ESTIMATES
DIVISION: Finance aM Administration
Program: General Expenses
1983 BUDGET SOURCES (J? FINAOCING 1982 BUDGET 1982 AC'roALS
ACTIVITY NET PROVIOCIAL KJNIC I PAL
EXPENDI'nJRES REVEmES EXPENDITURES GRANT LEVY O'I1fER EXPENDITURES REVENUES EXPENDITURES REVENUES
~ $ ~ $ ~ $ ~ $ $ $
Authority' Staff
Meetings aM
E\1nctions 30,000 30,000 30,000 26,500 47,648
Vehicles , Equipt
Expenses 5,000 5,000 5,000 5,000 5,000
Staff' Authority
Members Long
Service'
Retlranent 6,000 6,000 6,000 6,000 1,906
Insurance 16,000 16,000 16,000 14,000 11,106
Interest 30,000 30,000 (45,000) 75,000 96,716
Miscellaneous 6,000 6,000 6,000 6,000 9,082
Rental Properties
Maintenance 60,000 60,000 60,000 76,400
Realty Taxes 105,000 105,000 94,000 94,836
Insurance 7,000 7,000 6,000 3,986
Rental Incane 172,000 (172,000) 160,000 224,443
TOTAL 265.000 172.000 93.000 18.000 75.000 217.500 160,000 346,680 224.443
83.02 09
.
Page IV-8
1983 BUDGET ESTIHATES
DIVISION: Finance and Administration
Revenue Detail: General Expenses
1983 BUDGET 1982 BUDGET
&H. &
I ACTIVITY REVENUE ACTIVITY REVENUES 1982 ACTUALS
$
Rental Income on Authority-
owned Real Property 172,000 160,000 224,443
172 . 000 160,000 224,443
83.02.09
Page IV-9
1983 BUDGET ESTIMATES
DIVISION: Finance and Administration
PROGRAM: Property Acquisition, Haintenance and Hanagement
PURPOSE:
. To provide for the funding required for carrying out the purchase of lands under the Interim Water and Land Hanagement
Project and under the Waterfront Project.
. To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands under
Water and Related Land Hanagement Programs.
. To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands and
facilities under Conservation and Recreation Land Hanagement Programs.
. To provide for legal costs associated with the Authority's regulation enforcement.
1983 OBJECTIVES:
- To aC1uire lands for the Flood Control Program and Lake Ontario Waterfront Open Space land.
- Admin stration of taxes and insurance for both Water and Related and Conservation and Recreation.
- provision for regulation enforcement.
FUNDING:
The funding for this program is on a shared basis with 55\ and 50\ of the funds being available from the Province of Ontario
and the balance being funded by general levy on all participating municipalities.
FINANCIAL COHHENTS:
The funding for realty taxes does not make allowances for any market value assessment that may be implemented in 1983.
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL
$ 1,175,000 39,020 327,445 1,541,465
83.02.17
Page IV-I0
1983 BWGET ESTIMATES
DIVISION: Finance and Administration
Pt:ogram: Property Acquisition, Maintenance & Managanent
1983 BlJDGET SOURCES CF FINl\tCING 1982 BWGET * 1982 AC'lUALS
ACTIVITY NET PROVItCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEWEB EXPENDITURES REVENUES
~ ~ ~ ~ ~ ~ ~ ~ 1J ~
Flood Control
Land AcquiSItion 550,000 550,000 150,000 152,500P 500,000 604,913
247,500
\'laterfront llazard
Land Acquisition 325,000 325,000 146,250 178,750P 325,000 332,204
.
Waterfront
Open Space Land
Acquisition 300,000 300,000 150,000 150,000P 707,500 678,034
Legal Costs
Regulation
Enforcanent 11,000 11,000 6,050 4,950 15,000 8,476
.
Water & Related
Taxes 260,245 260,245 143,135 117,110 234,000 194,350
Insurance 14,300 14 , 300 7,865 6,435 12,800 9,150
Conservation &
Recreation
Taxes 67, 200 67,200 33,600 33,600 60,000 48,690
Insurance 13,720 13,720 6,860 6,860 12,200 9,154
TOTAL 1,541,465 1,541. 465 347,510 465,205 728,750 1. 866,500 1,884,971
* as amended
P - Provincial cash flow to be requested
83 02.17
,
Page IV-ll
1983 BUDGET ESTIHATES
DIVISION: Finance and Administration
PROGRAH: Vehicle , Equipment Purchases - New and Replacement
PURPOSE:
To sustain the Authority's vehicles and equipment, and food services equipment complement at adequate levels to assure
economy, efficiency and productivity in various programs.
1983 OBJECTIVES:
- To purchase the following equipment:
Division Vehicle Replacement New Equipment Replacement Equipment
Water Resource 25,000 3,000
Conservation Land Hanagement 27,000 13,600 143,650
Information , Education 15,000 3,480
67,000 13,600 150,130
FUNDING:
Replacement vehicles and equipment are funded via recoveries (based on use) from operating divisions and includes provincial
grant and municipal levies as applicable through the Vehicle and Equipment Fund. New equipment and vehicles are funded from
municipal levy.
FINANCIAL COHHENTS:
No recovery is available from the Hinistry of Natural Resources for Food Service Equipment. It is necesary to derive funds
for Food Service Equipment from the Authority's Operating Fund.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies , Vehicles , Real Services Financial
, Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL
$ 280,730 280,730
83.02.09
Page IV-12
1983 BUDGET wrIHATES
DIVISION: Finance and AdwJnistration
Program: Vehicle , Equipnent Pw:chases - New , Replacenent
1983 BlIX>ET OOURCES <F FINl\OCIOO 1982 BlD.>ET 1982 ACTUAIlJ
ACTIVITY NET PROVIOCIAL HlmICIPAL
EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVmUES EXPENDITURES REVENUES
~ T $ $ V $ $ $ $ $
Vehicles - New -
- Replacanent 67,000 67,000 67,000 79,000 81,654
Equipnent - New 13,600 13,600 13,600 9,100 2,706
- Replacenent 150, 130 150,130 150,130 118,190 123,079
Food Services
Equipnent 50,000 50,000 50,000 35,735 1,049
TOTAL 280.730 280,730 13.600 267.130 242.025 208,488
83.02.09
Page IV-13
1983 BUDGET ESTIMATES
DIVISION: Finance and Administration
PROGRAH: Food Services
PURPOSE: To provide food services at the refreshment stands, Half Way House, Kortright Centre for Conservation and the
Conservation Field Centres.
1983 OBJECTIVES: - To provide a high quality food service that is attractive to all visitors;
- To maximize net revenue from the food operation.
I
FUNDING: This program is funded from revenues.
FINANCIAL COMMENTS: The net revenues will be used to offset operating and maintenance costs in the areas where the
revenues are produced.
OBJECTIVE CLASSIFICATIONS:
Salaries Haterials
Wages & Supplies & Cost Services Financial
Benefi ts Utilities Equipment of Sales & Rents Taxes Expenses TOTAL
1; 401,530 129,981 226,354 75,452 833,317
83.02.10
Page IV-14
1983 BUDGET ESTIMATES
DIVISION: Finance and Administration
Program: Food Serv ices **
1983 BUDGET SOURCES <F FINAtCING 1982 BtJOOET 1982 AC'lUALS
ACTIVITY NET PROVItCIAL KlNICIPAL
EXPENDI'l\IRES REVENUES EXPENDI'l\IRES GRANl' LEVY 0'l1IER EXPENDITURES REVENUES EXPENDI'l\IRES REVENUES
Program ,
Administration 156,150*
Conservation Land
Managanent -
Refreshnent
StaMs , Group
Catering 165,900 187,000 (21,100)
Information'
Education -
Conservation
Field Centres 259,417 259,417
Kortright Centre 46,000 56,000 (10,000)
305,417 315,417 (10,000)
Historical Sites-
IIalf\<.aY Ibuse 259,000 290,000 (31,000)
Refreshnent
StaM 103,000 ll3,000 (10,000)
362,000 403,000 (41 ,000)
'I'O'fAL 833,317 905,417 (72,100)
* Amount included in divisional budgets above aM is shown separately only for infoonation purposes.
** Net expenditures have been incoporated into divisional operating budgets. The above summary is shown separately as additional infoonation.
Al n... In
Page V-I
1983 BUDGET ESTIMATES
THE WATER RESOURCE DIVISION
This Division is responsible for the carrying out of the approved water management policies and programs of the Authority, as
they apply to the river systems and the Lake Ontario Waterfront, including'
- administration of the Flood Control Program,
- administration of the Waterfront Development and Shoreline Management Program,
- administration of the Storm Water Management Program,
- the development and operation of the Flood Warning System,
- technical advice and direction concerning the enforcement of the Authority's fill regulations and development control,
.
- environmental monitoring and review of flood control and waterfront projects,
- the administration of the Authority's Erosion and Sediment Control Program,
- the co-ordination of site plans and development with municipalities and Province of Ontario.
82 09 27
.
Page V-2
1982 ACIIIEvmENTS
Provided adequate funding for staff to achieve program objectives. flood control works.
Completed final engineering and first phase of construction for Bol ton
Completed flood control channel at Oak Ridges
Completed studies of Palgrave Dam and Goodwood Pumping Station.
. Operated and maintained existing flood control structures, carried out maintenance on Hassey Creek channel.
Operated and continued improvements to the Flood Warning and Flood Forecasting System.
Updated hydrological studies and flood plain mapping.
. Provided protection from erosion and slope instability at priority sites in Metropolitan Toronto, Peel, York and "Durham,
Commenced Highland Creek remedial erosion control works.
. Completed Environmentally Significant Areas study and circulated to member municipalities and interested agencies.
Completed Environmental Assessment report for Keating Channel remedial measures
Reviewed and commented on development proposals, administered Fill, Construction and Alteration to Waterways regulations
Reviewed and commented on Storm Water Management proposals and reports.
Completed Humber Bay West Phase II, substantially completed Bluffers Phase II
Continued development at Marie Curtis Park
-
1983 PRIORITIES .
Flood Control to provide for administration of the Flood Control Program
. to complete remedial flood control measures at Bolton
to operate and maintain the Flood Warning and Flood Forecasting System
to maintain Flood Control dams
to maintain Flood Control channels and structures
to maintain other water control structures.
Erosion Control . to carry out remedial measures in Metropolitan Toronto on a priority basis
. to complete Phase I, Highland Creek remedial measures
. to carry out remedial measures in Peel, York and Durham on a priority basis
to commence Phase II, Highland Creek remedial measures
Shoreline Management remedial measures on Lake Ontario Shoreline on a priority basis.
to carry out
Environmental and Other Studies
to undertake pre-engineering studies
to commence preparation of Master Drainage Plans
. to update and continue various Watershed studies
Lake Ontario Waterfront Development
. to provide for administration of Lake Ontario Waterfront programs
. to commence work at Samuel Bois Smith Waterfront Area
to provide internal access and servicing at East Point
to complete servicing and site stabilization at Bluffers Park
to complete initial development (road access, parking) at Bluffers Toplands
. to continue Environmental Monitoring Program
to provide predevelopment maintenance
82 09.27
Page V-3
1983 BUDGET ESTIMATES
DIVISION Water Resource SEX::TION Flood Control
1983 BUDGET SOURCES <F FINAN:ING 1982 BUDGET 1982 ACTUALS
PROGRAM NET PROVIN:IAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY O'I1IER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ $ ~ ~ ~ $ $ $ $
Program
Administration 743,652 743,652 394,850 337,681 11,121 680,640 690,282
Erosion ~tro 396,500 11, 500 385,000 179,575 173,250 32,175P 415,000 15,000 409,741 5,781
Erosion Peel 35,600 5,600 30,000 10;000 13 , 500 6, SOOP 32,000 2,000 30,209
Erosion York 23,500 3,500 20,000 4,950 9,000 6,050P 21,500 1,500 22,753 4,200
Erosion Durham 5,000 5,000 2,250 2,750P 5,300 300 4,892
..
Flood Control
Planning &
Ranedia1 ~rks 1,343,500 1,343,500 541 , 100 93,825 604,900 896,680 900,950
103,675P
Flood Control
Maintenance/
anal1 OcI11s &
Channels 244,000 244,000 134,200 109,800 155,000 156,027
Flood Control
River 65'8~ I I I I 115'~1
Forecasting 119,637 119,637 53,837 121,000
J rorAL I 2,911,389 I 20,600 I 2,890,789 l 1,330,475 793,143 767,171 2,327,120 18,800 2,330,483 I 9,981 I
P - Provincial cash flow to be requested.
83 02 17
.
Page V-4
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: ' Flood Control
PROGRAH: Program Administration
PURPOSE:
T,o provide administrative, planning, biological and engineering staff necessary for implementing 1983 programs.
1983 OBJECTIVES:
Complete the 1983 phases of the Water Resource Division programs of flood control, development control and environmental
planning and monitoring within the funding limits.
,
FUNDING:
This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the
General Levy on all participating municipalities
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries SUfPlies " Real Services
, Wages Ut lities Equipment Property , Rents TOTAL
$ 665,352 15,200 63,100 743,652
83.02.17
,
.
Page V-5
1983 BUDGET ESTIMATES
DIVISION: Water Re~urce SECl'ION : Flood Control
Program: Progran Administration
1983 BWGET SOURCES <F FINAtCIOO 1982 BWGRT 1982 AC'IUALS
AC1'IVITY NET PROVUCIAL K1NIC I PAL
EXPENDITURES REVEWES EXPENDITURES GU\NT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
~ ~ ~ ~ ~ T ~ ~ ~ ~
Salaries 553,815 553,815 292,365 250,329 11,121 522,370 535,598
Benefits 111,537 111,537 61,345 SO, 192 110,405 101,227
Travel 14,000 14,000 7,700 6,300 14,165 14,032
Enforcanent
Officer Travel 17,600 17,600 9,680 7,920 14, 600 17,923
Technical Haps
Legal 9,000 9,000 4,950 4,050 15,000 10,308
Data Processing 5,500 5,500 3,025 2,475 3,685
Flood Control
Workshop 3,500 3,500 3,500 3,500 7,509
Regulations -
Fill'
Construction 28,700 28,700 15,785 12,915
TOTAL 743,652 743,652 394,850 337,681 11,121 680,640 690,282
83.02.17
Page V-6
1983 BUDGET ESTIMATES
DIVISIONl Water Resource SECTIONl Flood Control
.
PROGRAMl Erosion Control - Metropolitan Toronto
PURPOSE I
To minimize the hazards of erosion to life and property within Metropolitan Toronto.
1983 OBJECTIVES I
- To carry out remedial protection works in vulnerable valley areas on a priority basis.
- To continue to update and augment the current erosion inventory files and priorities
FUNDING I
This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the
benefiting municipality, being the Municipality of Metropolitan Toronto
FINANCIAL COMHENTSl
Total cost includes expected revenues of $11,500
OBJECTIVE CLASSIFICATIONS I Materials
Salaries Supplies & Survey & Services
& Wages Utilities Equipment Legal & Rents TOTAL
$ 77 , 900 130,000 800 10,000 177, 800 396,500
82 08 10 .
Page V-7
1983 BUDGET ESTIMATES
DIVISION: Water Resource SEX::TIOO: Flood Control
Program: "Erosion Control - Metro
1983 BWGE'I' SOURCES <F FINl\tCING 1982 BWGET 1982 AC'IUALS
ACTIVITY NET PROVItCIAL KJNIC I PAL
EXPENDITURES REVEWES EXPENDITURES GRANT LEVY 0'I11ER EXPENDITURES REVElm:S EXPENDITURES REVENUES
~ q ~ T ~. (J (J $ ~ ~
Administration 43,000 43,000 23,650 19,350 38,000 34,376
Ranedial ibrks 353,500 11,500 342,000 155,925 153,900 32,175P 377 ,000 15,000 375,365 5,781
TOTAL 396.500 11.500 385.000 179.575 173.250 32, 175P 415.000 15,000 409.741 5,781
P - provincial cash flow to be requested.
83.02.17
.
Page V-A
1983 BUDGET ESTIMATES
DIVISIONI Water Resource SECTION I Flood Control
PROGRAM I Erosion Control - Peel
PURPOSEI
To minimize the hazards of erosion to life and property within the Regional Municipality of Peel.
1983 OBJECTIVES I
- To carry out remedial protection works in vulnerable valley areas on a priority basis
- To continue to update and augment the current erosion inventory files and priorities
FUNDING I
This a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the
benefiting municipality, being the Regional Municipality of Peel
FINANCIAL COMMENTSI
Total cost includes expected revenues of $5,600
OBJECTIVE CLASSIFICATIONS I Materials
Salaries Supplies & Real Services Survey &
& Wages Utilities Equipment Property & Rents Legal TOTAL
$ 3,000 12,300 16,800 3,500 35,600
82 08 10
Page V-9
1983 BUDGET ESTIMATES
DIVISION: Water Resource SB::TIOO : Flood Conttro1
Program: Erosion Control - Peel
1983 BUDGET SOURCES (F FINl\tCING 1982 Bf.IJG8T 1982 AC'IUAlS
ACTIVITY NET PROVI~IAL KJNICIPAl'..
EXPENDITURES REVEtIJES EXPENDI'nJRES GtANT LEVY 0'I1IER EXPENDITURES RI.'VEWES EXPEflJITURES REVENUES
~ ~ ~ ~ f$ If !i ~ ti ~
Mninistration 4,000 4,000 2,200 1,800 2,500 2,418
Ranedia1 Works 31,600 5,600 26,000 7, 800 11, 700 6,500P 29,500 2,000 27,791
.
'lQI'AL 35,600 5,600 30,000 10,000 13.500 6.500P 32,000 2,000 30,209
P - Provincial cash flow to be requested.
83.02.17
.
,
,
Page V-lO
19B3 BUDGET ESTIMATES
.
DIVISION: Water Resource SECTION: Flood Control
PROGRAM: Erosion Control - York
PURPOSE:
To minimize the hazards of erosion to life and property within the Regional Hunicipality of York.
19B3 OBJECTIVES:
- To carry out remedial protection works in vulnerable valley areas on a priority basis.
- To continue to update and augment the current erosion inventory files and priorities.
FUNDING:
This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the
benefiting municipality, being the Regional Municipality of York
FINANCIAL COMMENTS:
Total cost includes expected revenues of $3,000
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Survey &
& Wages Uti li ties Equipment Property & Rents Legal TOTAL
$ 3,500 8,000 10,500 1,500 23,500
82 08 10
Page V-ll
1983 BlIXiET ESTIMATES
DIVISION: Water Resource SD:TION: Flood Control
Program: Erosion Control - York
1983 BI.IDGE'l' SOURCES (F FItIMCIOO 1982 BIDGE'I' 1982 AC'fUA[S
lICTIVI TY NET ~OVnCIAL KJNIC I PAL
EXPENDITURES REVENJES EXPENDITURES GRANT LEVY OTHER EXPENDI'l'URES REVENUES EXPEmITURES REVEMJES
~ ~ ~ ~ I,; I,; ~ ~ ~ I?
lIdministration 2,000 2,000 1,100 900 2,000 3,403
Ranedial ~rks 21,500 3,500 18,000 3,850 8,100 6,050P 19,500 1,500 19,350 4,200
TOTAL 23,500 ~~500 20,000 4,950 9,000 6,050P 21,500 1,500 22,753 4,200
P - provincial cash flow to be requested
83.02.17
,
.
Page V-12
1983 BUDGET ESTIMATES
DIVISIONr Water Resource SECTIONr Flood Control
PROGRAMr Erosion Control - Durham
.
PURPOSEr
To minimize the hazards of erosion to life and property within the Regional Municipality of Durham.
1983 OBJECTIVES,
- To carry out remedial protection works in vulnerable valley areas on a priority basis
- To continue to update and augment the current erosion inventory files and priorities.
FUNDING,
This is a shared program, 55\ of the funds being available from the Province of Ontario and the balance being funded from the
benefiting municipality, being the Regional Municipality of Durham
FINANCIAL COMMENTSr
OBJECTIVE CLASSIFICATIONS, Materials
Salaries Supplies & Real Services
& Wages Utilities Equipment Property & Rents TOTAL
$ 600 2,000 2,400 5,000
82 08 10
Page V-13
1983 BUDGET ESTIMATES
DIVISION: Water Resource SECl'ION: Flood Control
Program: Erosion COntrol - Durham
1983 BlIn:T SOURCES CE FINl\tCING 1982 BI.IXE'I' 1982 AC'lUAl.8
ACTIVITY NET PROVltCIAL K1NIC I PAL
EXPENDIWRES REVIaJES EXPENDITURES GRANT LEVY 0'l11ER ExmmIroRES REVENUES EXPENDITURES REVENUES
S f{ S Ii ti ti $ $ $ $
Administration 300 300 135 165P 500 612
Raoedial Works 4,700 4,700 2,115 2,585P 4,800 300 4,280
.
rofAL 5.000 5,000 2,250 2, 750P 5,300 300 4.892
P - Provincial cash flow to be requested.
83.02.11
.
Page V-14
1983 BUDGET ESTIHATES
DIVISION: Water Resol1rce SECTION: Flood Control
PROGRAH: Flood Control Planning and Remedial Measures
PURPOSE:
To undertake a comprehensive program of flood control designed to prevent, eliminate or reduce the risk of hazard to life and
property, while cognizant of the natural attributes qf the valley system.
1983 OBJECTIVES:
- To continue to carry out preliminary engineering on the Authority's damage centres.
- To complete flood control remedial works on the Humber River at Bolton.
- To assist municipalities in the preparation of Haster Drainage Plans for storm water management.
- To continue erosion control measures on Highland Creek.
FUNDING:
This is a shared program, 55' of the funds being available from the Province of Ontario and the balance being funded from the
General Levy on all participating municipalities, with the exception of the Bolton remedial works where funding is to be
provided 100\ by the Province of Ontario.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services
& Wages Utilities Equipment Property & Rents TOTAL
$ 5,500 55,000 1,283,000 1,343,500
83 02.10
Page V-IS
1983 BUDGET ESTIMATES
DIVISION: Water Resource mcrIOO: Flood Control
Program: Flood Control Planning and Raoedial Measures
I 1983 EIUDGET OOURCES <F FINAtCIOO 1982 BllXET* 1982 AC'I'UALS
AC'fIVI'1'Y NET PROVItCIAL K1NIC I PAL
EXPENDITURES REVEtIJEB EXPENDITURES . GRANT LEVY O'l1IER EXPENDITURES REVENUES EXPEWI'IURES REVENUES
$ $ ~ ~ ~ ~ $ $ $ $
Bolton RanaUal
\'brks 1,135,000 1,135,000 530, 100 604,900 540,000 553,156
.
preliminary
Eng ineeri~ 25,000 25,000 11,250 13, 750P 54,300 76,388
Master Drainage
Planning 20,000 20,000 11,000 9,000 20,000 4,568
Envlronnental
Studies 13,500 13,500 6,075 7,425P 55,000 41,087
HighlaM
Creek 150,000 150,000 67,500 82,500P 100,000 95,952
Keating
Channel 50,000 43,230
Oak Ridges
Channel -
Ranedia1 \'brks 35,000 44,982
Flood Plain
Mapping 42,380 41 , 587
TOTAL 1.343,500 1.343,500 541, 100 93.825 708,575 896,680 900.950
as ameMed
P - provincial cash slow to be requested.
83.02.17
.
Page V-16
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: Flood Control
PROGRAH: Flood Control HaintenancejSmal1 Dams, Channels, Erosion Control Structures
PURPOSE:
Maintaining capital works already in place.
1983 OBJECTIVES:
- To provide for regular maintenance of the water control structures at a level comparable with 1982.
- To carry out major maintenance at Palgrave Dam and in the Lower Humber Channel.
FUNDING
This is a shared programI 55\ of the funds being available from the Province of Ontario and the balance being funded by the
General Levy on all part cipating municipalities.
FINANCIAL COHHENTS:
Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major maintenance.
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies' Real Services
, Wag es Utilities Equipment Property , Rents TOTAL
$ 49,045 34,150 160,805 244,000
83.02.17
Page V-17
1983 BlIlGET ESTIMATES
DIVISION: water Resource SECl'ION : Flood Control
Program: Flood Control Maintenance/Small Dams, Channels, Erosion Control Structures
1983 BlIlGBT SOURCES <F FINAtCING 1982 BtIlGET 1982 ACTUALS
ACTIVITY NET PROVItCIAL KJNICIPAL
8XPENDI'lURES REVEtIJES EXPENDITURES GRANT LEVY OTHER EXPEtIlI'lURES REVEHJES EXPEtI>ITURES REVENUF..B
$ $ $ $ $ $ $ $ $ $
Small Dams 14,000 14,000 7,700 6,300 13,000 14,850
Major Maintenance 148,000 148,000 81,400 66,600 60,000 65,791
Erosion
Channels 7,000 7,000 3,850 3,150 7,000 9, 146
Flood Control
Olannels 75,000 75,000 41,250 33,750 75,000 66,240
TOTAL 244,000 244.000 134 . 200 109.800 155.000 156.027
83.02.17
.
Page V-18
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: E"lood Control
PROGRAH: Flood Control River Forecasting Operations/Haintenance Water Control Structures
PURPOSE:
To operate, maintain and improve the Authority's ability to provide the earliest possible warning of a flood threat and to
operate its flood control structures.
1983 OBJECTIVES:
- To continue regular operation and maintenance of the Flood Control Works and the Flood Warning and Flood Forecasting System
at a level comparable with 1982.
- To upgrade the data collection and analysis techniques required for advanced flood warning.
FUNDING:
This is a shared rrogram1 55' of the funds being available from the Province of Ontario and the balance being funded by the
General Levy on a 1 part cipating municipalities.
FINANCIAL COHHENTS:
Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major maintenance.
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies , Real Services
, Wages Utili ties Equipment Property , Rents TOTAL
$ 55,798 23,750 6,080 34,009 119,637
83.02.,..
Page V-19
1983 BIJOOET ESTIMATES
DIVISION: Water Resource SfI:TION: Flood Control
Program: Flood Control River Forecasting Operations/Maintenance water Control Structures
1983 BlDGET SOURCES <F FINl\tCING 1982 BI.DGE'I' 1982 AC'I'UALS
ACTIVITY NET PROVIK.:lAL tllNIC 1 PAL
EXPEWITURES REVENUES EXPENDITURES GRANT LEVY 0'l11ER EXPEtI>ITURES REVENUES EXPENDITURES REVENUES
$ (I $ $ $ ..~ $ ~ $ $
Claireville Dcm 38,324 38,324 21,078 17,246 35,750 37,441
G.Ross Lord Dam 33,437 33,437 18,390 15,047 30,550 32,221
Flood Warning 33,376 33,376 18,357 15,019 40,200 30,231
Flood Warning
Systan D:}uipnt.
K>delling 14 , 500 14 , 500 7,975 6,525 14,500 15,736
TO'fAL 119,637 119,637 65,800 53.837 121,000 115.629
83 02.17
. ,
Page V-20
1983 BlIX>ET ESTIMATES
DIVISION: Water Resource SOCTION: Waterfront
1983 BWGE'l' SOURCES <F FINAtCING 1982 BWGE'l' * 1982 ACTUAlS
PR<QWi NET PROVItCIAL HWIC I PAL
EXPENDITURES REVEWES EXPENDITURES GRANT LEVY OTHER EXPmDITURES REVENUES EXPEmITURES REVENUES
$ $ $ $ $ $ $ $ ~ $
Waterfront
Mninistration 211,239 211,239 105,620 105,619 253,786 256,949
Shorel ine
Hanaganent 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600
Lake Ontario
Waterfront
Developnent 1,531,261 150,000 1,381,261 632,000 690,631 58 , 630P 1,090,671 1,114,029
TOTAL 2.325,000 150,000 2,175.000 1,007,620 1, 058.375 109.005P 1,767.500 1. 781. 578
* as anerded
p - Provincial cash flow to be requested.
83.02.17
. ,
Page V-21
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: Waterfront
PROGRAM: Waterfront Administration
PURPOSE:
To pro~ide administrative, planning, biological and engineering staff necessary for implementing Waterfront projects.
1983 OBJECTIVES:
- To proceed with design and construction of waterfront areas and shoreline management projects.
- To proceed with planning and approval submissions for future waterfront and shoreline management works.
FUNDING:
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the
General Levy on all participating municipalities. .
FINANCIAL COHMENTS:
Salaries and wages have been gapped by a factor of 1'.
OBJECTIVE CLASSIFICATIONS: Ha teri a 1 s
Salaries Supplies" Real Services
& Wages Utili ties Equipment Property & Rents TOTAL
$ 190,239 21 , 000 211,239
83.02.17
.
Page V-22
1983 BlDGE'l' ESTIMATES
DIVISION: Water Resource Sa:TION: Waterfront
Program: Waterfront Mninistration
1983 BUXFr OOURCES (F FINAtcING 1982 BtDGE'l' 1982 AC'I'UMS
ACTIVITY NET PROVItcIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES BXPENDITURES REVENUES
Ii $ ~ :? (; ~ :? -$ ~ $
Salaries 132,075 132,075 66,038 66,037 185,669 196,552
Benefi ts 58, 164 58,164 29,082 29,082 56,017 54,706
Travel 9,000 9,000 4,500 4,500 12,100 5,691
Data ProcessiR] 5,000 5,000 2,500 2, 500 -
Hi scellaneous 7,000 7,000 3,500 3,500 -
TOTAL 2ll,239 211,239 105.620 105,619 253.786 256,949
83;02.17
Page V-23
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: Waterfront
PROGRAM: Shoreline Hanagement
.
PURPOSE:
To continue the program of shoreline management designed to prevent, eliminate or reduce the risk of hazard to life and
property, while being cognizant of the natural attributes of the lake front setting.
1983 OBJECTIVES:
- To construct protection of vulnerable shoreline areas on a priority basis.
FUNDING:
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded by the
Municipality of Hetropolitan Toronto as benefiting municipality.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real Services
& Wag es Utilities Equipment Property & Rents TO TAr.
$ 160,500 201,500 1,500 219,000 582,500
83.02.17
,
.
Page V-24
1983 BWGE'l' ESTI,HATES
DIVISION: Water Resource SECrION: Waterfront
Program: Shoreline Managanent
1983 BUOOET SOURCES (F FINAtCING 1982 BWGE'l' 1982 IIC'lUALS
ACTIVITY NET PROVItCIAL 'UUCIPAL
EXPENDITURES REVElIJES EXPEYlITURES GRANT LEVY 0'l11ER EXPENDITURES REVEWES EXPENDITURES REVENUES
~ Ii ~ ~ ~ ~ ~ 'I ~ ~
Lakehurst COUrt 282,500 282,500 140,000 127,125 15, 375P
Design 15,000 15,000 6,750 8, 250P 100,000 96,948
Maintenance 15,000 15,000 6,750 8, 250P 50,000 49,117
South Harine
Drive 260,000 260,000 130,000 117,000 13,OOOP 15,000 14,900
Bluff Drainage 10,000 10,000 4,500 5,500P 20,000 18,879
Crescentwood 50,000 45,981
Kingsbury 19,893 16,823
Guild Inn 18,000 18,224
Springbank Ave. 150,150 149,728
TOTAL 582,500 582,500 270,000 262,125 50, 375P 423,043 410,600
P - provincial cash flow to be requested.
83.02.17
Page V-25
1983 BUDGET ESTIHATES
DIVISION: Water Resource SECTION: Waterfront
PROGRAM: Lake Ontario Waterfront Development
PURPOSE:
The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline, within the area of the Authority's
jurisdiction, a handsome wate~front, balanced in its land uses, which will complement adjacent areas, taking cognizance of
existing residential development and making available, wherever possible, featu~es which warrant public use.
1983 OBJECTIVES:
- To commence development at Samuel Bois Smith.
- To complete services and site work at Bluffers Pa~k.
- To complete initial development at the Bluffers Toplands.
- To provide internal access and servicing at East Point Park.
- To continue Environmental Honitoring program.
- To continue to provide pre-development maintenance.
FUNDING:
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the
Waterfront Capital Levy on all pa~ticipating municipalities. It is anticipated that revenue will be derived from the
landfi11ing operation at the Samuel Smith Waterfront Area.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies' Real Services
, Wages Utilities Equipment Property , Rents TOTAL
~ 109,500 15,300 10,000 1,396,461 1,531,261
83.02.17
. ,
Page V-26
1983 BlIlGET ESTIMATES
DIVISION: Water Resource SEJ::TION: Waterfront
progran: Lake Ontario waterfront Development - Capital I
1983 BlIXiET SOURCES <F PItwCING 1982 BWGET 1982 ACTUALS
ACTIVITY NET PROVItcIAL KlNICIPAL
EXPENDITURES REVEWES EXPENDITURES GRANI' LEVY OTHER EXPENDITURES REVENUES EXPEWITURES REVENUES
$ $ $ $ $ $ $ $ $ $
Made CUrtis 55,000 55,000 27,500 27,500 30,000 31,486
SamSnith 400,000 150,000 250,000 125,000 125,000 75,671 92,910
Humber Bay West 130,000 130,000 65,00Q 65,000 268,000 280,586
Aquatic Park 40,000 40,000 20,000 20,000P 23,000 16,280
Ashbrldges Bay 5,000 5,000 2,500 2,500 15,000 14,797
Bluffers
Top1arrls 100,000 100,000 50,000 50,000 1,000 1,184
Bluffers Park 330,000 330,000 165,000 165,000 550,000 549,519
East Point 344,261 344,261 169,500 172,131 2,630P 2,000 1,422
Petticoat Creek 5,000 5,000 2,500 2,500 4,000 3,302
Ajax Waterfront 30,000 30,000 15,000 15,000 25,000 24,991
K>ni tori~ 72,000 72,000 36,000 36,000P 72,000 73,193
Pre-Developnent
Property M;]t. 20,000 20,000 10,000 10,000 20,000 20,861
Ihtnber Bav East 5,000 3.498
TO'fAL 1,531,261 150,000 1,381,261 632,000 690,631 58.630P 1,090,671 1.114.029
P - Provincial cash flow to be requested.
83 02. 17
.
Page y!.:!.
1983 BUDGET ESTIMATES
THE CONSERVATION LAND MANAGEMENT DIVISION
This Division is responsible for the Watershed Recreation Program Which includes the planning, development,
operation and maintenance of recreational uses of conservation lands and all related activities including the
operations of the Authority's central stores.
This Division is responsible for the implementation and administration of the Conservation Land Management
Program for private landowners and the resource management of lands acquired as part of the Flood Control
and Waterfront programs, eIcept those under management agreements with municipalities.
I
82 08 06
I
Page ~
1982 ACHI EvmENTS
Conservation Land ManaIement implementation of directives for Urban Management component, Resource Management Tracts and
developed guide 1 nes for
management of Environmentally Significant Areas
prepared audio-visual on Urban Management for use with other public agencies
increased assistance to landowners for "Conservation Plans", maintained same level as 1981 in plantings, woodlot
mana1ement
part cipated in municipal, Provincial and Federal programs to provide employment and training to unemployed and special
groups
Watershed Recreation
finalized terms of reference and completed Phase I of Boyd Master Plan
completed first of two phases to improve access for disabled to Conservation Areas
. completed Indian Line Campground expansion Phase I and improvements to entrance to accommodate development of
Highway 427 by Ministry of Transportation and Communications
maintained Conservation Areas services at 1981 level
initiated major maintenance program at all Conservation Areas
1983 PRIORITIES
Conservation Land Management
to reduce off-stream erosion and sedimentation through continued implementation of management programs on urban, rural
and Authority lands
to improve fisheries potential
to maintain forestry management program
Watershed Recreation
to maintain level of service for visitors to Conservation Areas and Forest and Wildlife Areas, allowing for the
reduction of the Major Maintenance program
to continue the preparation of the Boyd Master Plan and complete the preparation of developed area Master Plans
review the recommendations of the 1982 marketing studies, develop a program to improve faci 11 ties for visitor services
and commence implementation
82 10 12
Page VI-3
1983 BIDGET ESTIMATES
DIVISION: Conservation Land ttmaganent
1983 BWGET ~ (J! FINl\tCING 1982 BWGE'l' 1982 1IC'IUAIS
PRoowt NET PROVUCI~L KJNIC I PAL
EXPENDITURES REVEWES EXPENDITURES GRAm' LEVY 0'I1IER EXPENDITURES REVENUES EXPEtIlITURES REVEWES
~ ~ ~ ~ ~ ~ f} f} f} $
Program
Adninistration 673,204 673,204 336,602 336,602 644 , 300 656,675
Watershed
Recreation
- Planning 75,000 75,000 37,500 37,500 120,000 76,457
- Developnent 181,960 181,960 80,000 85,490 16,470 627,000 148,928
- Operations 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218,076 999,040
Conservation Land
Managanent 469,181 134,000 335,181 166,775 168,406 329,000 44,000 398,374 108,103
.
TOTAL 3,548,345 1,150,000 2,398,345 620,871 1,760,998 16,470 3,924,000 1,044,000 3,498,510 1,107,143
83.02 17
.
Page VI-4
1983 BUDGET ESTIHATES
DIVISION: Conservation Land Hanagement
PROGRAH: Program Administration
PURPOSE:
To provide support services, to administer and develop Authority owned conservation lands and to provide a program of
conservation land management on public and private lands. Administration of the Central Services Workshop.
1983 OBJECTIVES:
- To provide adequate staff and services to implement the 1983 programs, including the updating of developed area master
plans, complete with operation and maintenance plans.
FUNDING:
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the
General Levy on all participating municipalities.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services
& Wages Utilities Equipment Property & Rents TOTAL
$ 631,404 16,300 25,500 673,204
83.(12.17
Page VI-5
1983 BWGET ESTIMATES
DIVISION: Conservation land Hanaganent
Program: Program Administration
1983 BlIXiE'l' souRcES CF FINAN::ING 1982 BlIJGE'l' 1982 AC'I'Ul\LS
ACTIVITY NET PROVItClAL K1NICIPAL
EXPENDITURES REVEtIJES EXPENDITURES GRAN!' LEVY 0'I1IER EXPENDITURES REVENUES EXPEtIlITURES REVENUES
~ ~ 11 ~ Iii ~ ~ ~ Iii 11
Salaries, wages
- Head Office 299,512 299,512 149,756 149,756 270,400 279,232
- Central
Services 83,518 83,518 41, 759 41,759 88,000 77,902
Travel
- llead Office 14,000 14,000 7,000 7,000 19,100 15,653
- Central
Services 4,000 4,000 2,000 2,000 4,200 4,648
Benefi ts 248,374 248,374 124,187 124,187 242,100 237,634
utilities'
Services
- lIead Office 8,900 8,900 4,450 4,450 3,000 14,912
- Central
Serv ices 14,900 14,900 7,450 7,450 17,500 26,694
TOTAL 673, 204 673.204 336 602 336,602 644,300 656,675
83.02.17
Page VI-6
1983 BUDGET ESTIMATES
DIVISIONI Conservation Land Management
PROGRAM Watershed Recreation Program - Planning
PURPOSEI
To provide long-term and site planning for the development and operation of Conservation Areas and Forest and Wildlife Areas
1983 OBJECTIVES I
- To complete the Boyd Master Plan, initiated in 1982, to provide direction and accommodate external planning issues
FUNDINGI
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the
General Levy on all participating municipalities
FINANCIAL COMMENTSI
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
& Wages Uti 11 ties Equipment Property & Rents TOTAL
$ 4,000 71,000 75,000
82 10 12
Page VI-7
1983 BlDGET ESTIMATES
DIVISION: Conservation Land Hanaganent
Program: Watershed Recreation - Planning
1983 BlDGE'l' SOURCES CF FINl\tCING 1982 BUDGET 1982 AC'l'UALS
ACTIVITY NET PROVItCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY O'l1IER EXPENDI~ REVEtIlES EXPENDI'ruRES REVENUES
~ ~ $ $ ~ ~ $ ~ ~ ~
Boyd Haster
Plan Stage I 50,000
Boyd Master
Plan Stage II 75,000 75,000 37,500 37,500 50,000 38,965
Planning &
Design Services 20,000 37,492
TOTAL 75,000 75,000 37,500 37,500 120,000 76,457
83.02.09
.
Page VI-8
1983 BUDGET ESTIMATES
DIVISION: Conservation Land Hanagement
PROGRAM: Watershed Recreation - Development
PURPOSE:
To develop grounds, facilities and services to provide outdoor recreation opportunities in accordance with the policies and
program direction as established in the Watershed Plan.
1983 OBJECTIVES:
- To continue improvements to Indian Line Campground including the construction of a 24 hour control building, and
landscaping.
- To complete improvements for access for the disabled tQ Conservation Areas.
- To construct one indoor washroom building at Albion Hills Conservation Area.
- To continue the award planting program.
- To improve the safety of the entrance to the Cold Creek Conservation Area.
FUNDING:
This is normally a shared program, SOl of the funding being available from the Province of Ontario and the balance being
funded from the General Levy on all participating municipalities. A special 75\ grant from the Province of Ontario is
available for the access program for disabled persons.
FINANCIAL COHMENTS:
OBJECTIVE CLASS.IFICATIONS: Materials
Salaries Supplies & Real Services
& Wag es Utilities Equipment Property 5. Rents TOTAL
$ 6,350 7,800 167,810 181,960
83.02.17
Page VI -9
1983 BlJDGET ESTIMATES
DIVISION: Conservation Land Hanaganent
Program: watershed Recreation - Development
1983 BUOOET SOURCES <F FlNAtCING 1982 BlDGE'I' 1982 l\C'IUALS
ACTIVITY NET PROVI OCIAL KtiICIPAL
EXPEmITURES REVENUES EXPENDITURES GRANl' LEVY O'l1IER EXPENDITURES REVENUES EXPEtiHTURES REVENUES
~ $ $ $ $ $ q $ $ $
Access -
Disabled Persons 21,960 21,960 5,490 16,470 20,000 14,461
Indian Line -
Control &1ilding 86,000 86,000 43,000 43,000 74,000
Albion Hills -
Washroans 71,000 71,000 35,500 35,500 100,000
B.C.C.A. -
Award Day 1,650 1,650 825 825 1,500
Cold Creek
Entrance
Development 1,350 1,350 675 675
Heart Lake -
Washroans 100,000
Indian Line -
WashrOQus 100,000 15,811
Indian Line -
General 176,500 41 , 868
Nature Trail
REilevelopment 15,000 15,288
TOrAL 181,960 181. 960 80.000 85.490 16,470 627,000 148,928
83.02.17
Page VI-I0
1983 BUDGET ESTIHATES
DIVISION: Conservation Land Hanagement
PROGRAH Watershed Recreation - Operations and Haintenance
PURPOSE:
To provide funding for the Operations and Haintenance component as identified in the Watershed Plan for providing recreation
opportunities on Authority lands.
1983 OBJECTIVES:
- To operate and maintain seven Conservation Areas and three Forest and Wildlife Areas to provide 1.1 million user days,
eliminating the Hajor Haintenance program and the Canoe Instruction program.
- To continue self-supporting visitor services programs to increase accessibility of recreation opportunities.
- To maintain a high level of visitor safety.
- To review the 1982 marketing plan and develop recommendations to improve visitor services.
FUNDING:
Program revenues provide approximately 48\ of required funding, the balance being a General Levy on all participating
municipalities.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries SlIfPlies & Real Services Financial
& Wages Ut li ties Equipment Property & Rents Taxes Expenses TOTAL
$ 1,285,650 407,000 265,200 191,150 2,149,000
83.02.17
Page VI-ll
1983 BlIlGET ESTIMATES
DIVISION: Conservation Land Hanaganent
Program: Watershed Recreation - Operations and Haintenance
1983 BUOOE'I' SOURCES CE FINAtCING 1982 BWG:T 1982 AC'l1.V\LS
ACTIVITY NET PROVItcIAL foI.WIC I PAL
EXPENDITURES REVENUES EXPENDITURES GRANl' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
~ (l fi (l ~ II ~ II ~ ~
Albion lUlls 361,300 180,000 181,300 181, 300 358,350 195,000 401,344 183,175
Bo~ 210,950 103,000 107,950 107,950 229,500 107,700 219,384 87,144
Bruce's Hill 268,250 150,000 118,250 118, 250 273,750 168,000 266,679 144,006
Claireville 335,100 249,000 86,100 86,100 352,850 204,600 372,610 263,667
Cold Creek 191,OQO 74,000 117,000 117,000 178,850 73,500 182,290 77,724
Glen llaffy 137,800 43,000 94,800 94,800 145,450 33,400 129,070 42,743
Greenwood 165,300 43,000 122,300 122, 300 168,900 46,500 176,161 38,258
lIeart Lake 188,550 12,000 116,550 116,550 194,600 83,100 186,124 56,164
Palgrave 18,450 9,000 9,450 9,450 17 ,400 6,900 10,794 9,097
Petticoat Creek 238,350 93,000 145,350 145,350 233,050 81,300 249,114 97,062
General 33,950 - 33,950 33,950 51,000 23,906
TOTAL 2,149,000 1,016,000 1,133,000 1,133,000 2,203,700 1,000,000 2,218.076 999.040
83.02.17
Page VI-12
1983 BUDGET ESTIMATES
DIVISION, Conservation Land Management
RETAIL SALES
AREA GATE REVENUES PROGRAM REVENUES REVENUES TOTAL
$ $ $ $
Albion lUlls 68,000 100,000 12,000 180,000
I Boyd 93,000 6,000 4,000 103,000
Bruce's Mill 90,000 35,000 25,000 150,000
C1airevil1e 62,000 19,000 2,000 83,000
Indian Line Campground -- 161,000 5,000 166,000
Cold Creek 21 , 600 21,200 31 , 200 74,000
Glen Haffy 29,900 9,600 3,500 43,000
Greenwood 31,300 11 , 500 200 43,000
Heart Lake 57,700 7,600 6,700 72,000
Palgrave 9,000 -- -- 9,000
Petticoat Creek 56, 200 33, 300 3,500 93,000
TOTAL 518,700 404,200 93,100 1,016,000
82 09 27
Page VI-I]
1983 BUDGET ESTIHATES
DIVISION: Conservation Land Hanagement
PROGRAH: Conservation Land Management
PURPOSE:
To provide technical assistance to private landowners to promote sound land management programs.
To carry out resource management programs for Authority lands for water conservation, sediment control and fish and wildlife
habitat improvement.
1983 OBJECTIVES:
- To continue to provide reforestation, farm tree and shrub plantings, stream improvement and woodlot management to private
and public landowners at the same level as in 1982.
- To continue resource management on Authority lands at the same level as in 1982.
- To continue the urban land program at a reduced level from 1982.
- To ~ncrease revenues from plant propagation.
,
FUNDING:
The Conservation Land Management Program is funded 55\ Provincial grants and 45\ municipal levy for water and related
programs.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies' Real Services Pinancia1
, Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL
$ 179,020 57,650 72,511 309,181
83.02.17
Page VI-14
I
1983 BUlXiET ESTIMATES
DIVISION: Conservation Land Hanaganent
Program: Conservation Land Managanent
1983 BlJDG:T SOURCES <F FINAtCIOO 1982 BWGE'l' 1982 IIC'ftJALS
ACT I VI 'rr NET PROVnCIAL ....,ICIPAL
EXPEmITURES REVEtuES EXPENDITURES GWlI' LEVY 0'I1IER EXPENDITURES REVENUES EXPENDITURES REVENUES
(I (I (I (I $ (I $ $ $ (I
Plant Propagation 123,170 120,000 3,170 1,744 1,426 40,000 30,000 119,674 96,267
Reforestation 22,700 2,000 20,700 11, 385 9,315 22,700 2,000 22,253 2,198
Urban ttmaganent 21,300 - 21,300 11,715 9,585 31,400 31,058
FalID Tree & .
Shrub 17,900 10,000 7,900 4,345 3,555 17,900 10,000 17,932 9,638
Resource
Hanaganent 13,500 - 13,500 7,425 6,075 21,400 20,357
Woodlot
Managanent 33,293 - 33,293 18,311 14,982 27,000 24,555
Stream
Improvanent 20,000 2,000 18,000 9,900 8,100 26,000 2,000 23,250
Forest
Managanent 57,318 57,318 31,525 25,793
TOTAL 309,181 134,000 175,181 96,350 78,831 186,400 44,000 259 079 108,103
83.02 17
Page VI-IS
1983 BUDGET ESTIMATES
DIVISIONI Conservation Land Management
I
PROGRAM I Conservation Land Management - Conservation Planning
PURPOSEI
To provide technical advice to private landowners to promote sound land management programs. To carry our resource management
planning activities for Authority lands and technical advice to agencies managing Authority lands in urban areas.
1983 OBJECTIVES I
- To continue to provide technical advice for reforestation, farm tree and shrub plantings, woodlot management, pond
management and stream improvement to private and pub~ic landowners.
FUNDINGI
This program is funded 55' by Provincial grants and 45' municipal levy.
FINANCIAL COMMENTSI
OBJECTIVE CLASSIFICATIONS I Materials
Salaries Supplies & Real Services Financial
" Wages Utilities Equipment Property " Rents Taxes Expenses TOTAL
$ 108,000 1,500 9,000 118,500
82.09 27
Page VI-16
1983 BIDGET ESTIMATES
DIVISION Conservation Land Hanagement
Program: Conservation Land Hanagaoent - Conservation Planning
1983 BIDGET SOURCES <F FINAtCING 1982 BlDGE'l' 1982 ACTUALS
ACTIVITY NET PROVItCIAL KIUCIPAL
EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEWES EXPENDITURES REVENUES
$ $ $ $ $ $ $ $ ~ $
Conservation
Planning 118,500 11B,500 65,175 53,325 90,000 90,471
.
TOTAL 118.500 118,500 65 175 53.325 90.000 90.471
83.02.09
.
Page VI-17
1983 BUDGET ESTIMATES
DIVISION. Conservation Land Management
PROGRAM. Conservation Land Management - Glen Haffy Fish Rearing
PURPOSE.
To carry out a program of fish rearing and stocking for selected Authority Conservation Areas and Forest and Wildlife Areas.
1983 OBJECTIVES.
- To produce approximately 45,000 rainbow trout.
FUNDING.
Funding is provided 50\ by Provincial grant and 50\ municipal levy for this program
FINANCIAL COMMENTS.
OBJECTIVE CLASSIFICATIONS. Materials
Salaries Supplies " Real Services Financial
& Wages Utilities Equipment Property " Rents Taxes Expenses TOTAL
$ 1,500 9,000 10,500
82 08 10
Page VI-18
1983 BUDGET ESTIMATES
DIVISION Conservation Lard Hanaganent
Program: Conservation LaM Hanaganent - Fish Rearing
1983 BlIX>ET OOURCES <F FINl\tcING 1982 BlIX>ET 1982 ACTUALS
AcTIVITY NET PROVIteIAL K]NIC I PAL
EXPENDITURES REVENUES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEtI.lES EXPENDITURES REVENUES
~ ~ ~ I;i .~ ~ ~ Ii S $
Glen Haffy -
Fish Rearing 10,500 10,500 5,250 5,250 10,500 10,493
TOTAL 10,500 10,500 5,250 5.250 10,500 10 493
83.02.09
Page y!.::.!!
1983 BUDGET ESTIMATES
DIVISIONI Conservation Land Management
PROGRAM' Non-Revenue Pro rties
PURPOSE:
To provide funding for the maintenance of non-revenue producing recreation areas.
1983 OBJECTIVESI
_ To maintain two Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use.
FUNDING I
Fun~iog is provided 100' by municipal levy on all participating municipalities.
FINANCIAL COMMENTSI
OBJECTIVE CLASSIFICATIONSI Materials
Salaries Supplies " Real Services Financial
" Wages Utilities ~uipment property " Rents ~ Expenses ~
$ 10,900 2,500 11,600 31,000
82 09 27
I
Page VI -20
1983 BUDGET ESTIMATES
DIVISION Conservat~on Land Hanaganent
Program: Conservation Land Hanaganent - Operations and Maintenance - Non-Revenue
1983 BUDGET OOIJRCES (F FINAtCING 1982 BlIX2ET 1982 AC'lUAl.S
ACTIVITY NET PROVItCIAL KJN IC I PAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEtIJES EXPENDITURES REVENUES
fJ ~ $ (I ~ $ ~ ~ fJ ~
Operations and
Maintenance -
Non-Revenue 31,000 31,000 , 31,000 42,100 38,331
TmAL 31,000 31,000 31,000 42,100 38,331
83.02.09
Page VII-I
1983 BUDGET ESTIMATES
THE INFORMATION AND EDUCATION DIVISION
This Division is responsible for the Community Relations Program of the Authority.
Conservation Information functions include:
- the implementation of the general information programs, including the provision of both
internal and external communications1
- information on resource management programs1 and
- planning, market research, information and media contact.
Conservation Education functions include:
- conservation field centres1
- various historical and conservation interpretive progra~s1 and
- the Kortright Centre for Conservation
82 09 28
Page VII-2
CONSERVATION INFORMATION
1982 Achievements
. Provided, at an increased level of service, a Conservation Information Program for Authority members and staff, the
general public and special interest and community groups.
. Provided, through market analysis, a communications program for the Authority's public use facilities, completed a visitors'
survey report; developed 8 market plan for Conservation Areas, Black Creek pioneer Village and Kortright Centre for
Conservation.
. Provided information on the Authority's resource management programs; tour of Etobicoke-Himico Watersheds.
1983 priorities
. To maintain 1982 level of service in Conservation Information proyram.
. To review and revise the communications program for Authority pub ic use facilities as required by the results of the
marketing plan; to commence implementation in 1983
. To increase the level of information, through seminars and technical bulletins, on the Authority's resource management
programs.
CONSERVATION EDUCATION
1982 Achievements
. Maintained the number of residential opportunities at the four residential field centres and day-use opportunities at Cold
Creek Conservation Field Centre, Black Creek pioneer Village and Bruce's Hill.
. Increased visitation to Kortright Centre for Conservation by 15,000.
. Co-operated with York and Guelph Universities and the Canada Centre for Inland Waters in environmental research at
Lake St. George.
. Provided opportunities for special groups at residential field centres (March of Dimes, York University, Archaeology
program) .
. Developed theme programs for Kortright Centre in Fish and Wildlife, Water and Renewable Energy.
. Commenced major maintenance at Albion Hills and Claremont Field Centres.
1983 priorities
. To maintain the Qumber of residential and day-use opportunities.
. To accommodate, 20,000 additional visitors at the Kortright Centre for Conservation.
. To continue development of audio-visuals, exhibits and demonstrations for the Kortright Centre for Conservation. .
. To increase the use of volunteers in the Black Creek pioneer Village program to reduce staff costs and increase funds
available for operations and maintenance.
. To continue to provide General Interpretive Programs at program cost.
. To complete major maintenance at the Albion Hills Conservation Field Centre and to establish a major maintenance fund.
. To establish a 2-c1ass residential centre at Albion Hills by agreement with the Board of Education for the Borough of
Etobicoke.
83.02.17
.
Page VII-3
1983 BlIX>E'r ESTIMATES
DIVISION: Infoouation and Education
1983 BUDGET SOURCES (J!' FINl\tcIOO 1982 BUDGET 1982 AC'ltIALS
PROORAH NET PROVItcIAL MUNICIPAL
EXPEWITURES REVENUES. EXPENDITURES GRANT LEVY 011fER EXPENDITURES REVENUES EXPFIDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
Program rdnin.
General 300,420 300,420 150,210 150,210 268,385
Infoou.SUpport 64,842 64,842 32,421 32,421 59,990
Education SUpp. 35, 108 35,108 17,554 17,554 32,117
Data Processing 15,000 15,000 7,500 7,500
415,370 415,370 207,685 207 , 685 360,492 352,512
Camlmity
Relations Infoou.
General 80,127 80,127 43, 170 36,957 74,100 63,830
Resource Hlt. 11,000 11,000 6,050 4,950 10,000 9,894
PlanningjMarket
Analysis 90,243 90,243 90,243 125,000 124,260
CamiIIl i ty
Relations Educ.
Supv.~., Htce. 1,273,083 1,136,300 136,783 58,780 78,003 1,037,764 873,800 1,223,822 1,067,965
Supv.Ops.' Htce.
KortrIght 442,000 264,850 177,150 19, 140 120,460 37,550 393,000 232,150 400,531 219,918
Supv.Ops.' Htce.
B.C.P.V. * * 157,500 * 163,500 * (6,000) * 174,450 * 179,700 * 127,035 * 147,697
Developnent 114,800 114,800 9,600 105,200 .. 180,500 36,077
TOTAL 2,426,623 1,401,150 1,025.473 334,825 547,898 142.750 2.180.856 1,105,950 2,210,926 1. 287 . 883
* These amowlts are included in the Historical Sites Division aJdget, and do not add to totals here.
** Provincial cash flow eliminated in 1982.
83.02.17
Page VII-4
1983 BUDGET ESTIHATES
DIVISION; Information and Education
PROGRAH: Program Administration
PURPOSE:
To provide an administrative, supervisory and support service staff to implement a comprehensive information, community and
staff relations and outdoor and conservation education program.
1983 OBJECTIVES:
- To continue the programs carried out in 1982 at the same level of service.
FUNDING:
This is a shared program, 50\ of the funds from the Province of Ontario and 50\ from the general municipal levy.
FINANCIAL COMHENTS;
OBJECTIVE CLASSIFICATIONS: Materials
Salaries SUfPlies & Real Services
& Wages Ut lities Equipment Property & Rents Taxes TOTAL
$ 390,610 24,700 415,370
83.02.17
Page VII-5
1983 B~ ESTIMATES
DIVISION: Iofonnation and Fducation
Program: Program Administration
1983 BUDGET SOURCES (F FINAtCING 1982 BlDGE'l' 1982 AC'IUALS
ACTIVITY NET PROVItCIAL tllNIC I PAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEW OTHER BXPEtI>ITURES REVEHJBB EXPENJITURES REVmJES
I} $ $ $ $ $ $ $ $ $
General
Salaries 142,966 142,966 71,483 71,483 136,100 139,975
Expenses 4,800 4,800 2,400 2,400 6,500 12,676
Benefits* 124,237 124,237 62,118 62,119 125,785 101,021
Severance Pay 28,417 28,417 14,209 14,208
300,420 300,420 150,210 150,210 268,385 253,672
Camnnity
Relations Inf.
Support:
salaries 61,142 61,142 30,571 30,571 56,490 58,703
Expenses 6~'~~~ 3,700 3~':~~ 3~':~~ 5~'~g 6~'~~~
~ 64,842 ~ ~ ~ ~
CamllIli ty
Relations Ell.
Support:
Salaries 33,908 33,908 16,954 16,954 32,117 33,312
Expenses 1,200 1,200 600 600
35,108 35,108 11,554 17 , 554 32,117 33,312
Data Processing 15,000 15,000 7,500 7,500
rofAL 415,370 415,370 207,685 207,685 360,492 352,512
· BenefIts - Inc lude benefits for all full-time, contract ind part-time enployees of the Infonnation aM mucation DIVISIon
82 02.17
Page VII-6
1983 BUDGET ESTIHATES
I
DIVISIONz Information and Education
PROGRAM: Community Relations - Information - General
PURPOSE:
To provide b~ochures, still and motion picture photographic materials, exhibits and special functions to implement the
internal and external general information program of the Authority.
1983 OBJECTIVESz
- To maintain the level of service provided in 1982.
FUNDING:
This is a shared program, 55\ of the funds being available from the Province of Ontario and 45\ being funded from the general
levy on all participating municipalities for publications and printing, photographic materials, tours and special days,
applicable to Water and Related Land Hanagement program~; and financed on a 50\ Province of Ontario grant and 50\ general levy
for all Conservation and Land Hanagement programs.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies , Real Services Financial
, Wages Utilities Equipment Property , Rents Taxes Expenses TOTAL
$ 58,400 21,727 80,127
83.02.17
Page VII-7
1983 BlDGET ESTIMATES
DIVISION: Infonnation and ~ucation
Program: CatmlIlity Relations - Information - General
1983 BI.IOOET SOURCES (F FINAtCING 1982 BWGE'l' 1982 ACroALS
ACTIVITY NET PROVItCIAL folJNIC I PAL
EXPENDITURES REVEWES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPEWI'IURES REVmJES
~ 11 ~ 11 11 11 ~ 11 11 ~
Publications &
PrlntiDJ 51,827 51,827 28,505 23,322 39,800 46,574
Photographic 1,700 1,700 935 765 1,200 742
Tours & Special
Days 8,600 8,600 4,730 3,870 13,100 5,779
Motion Picture
Program 8,000 8,000 4,000 4,000 12,000 6,733
Exhibits 8,000 8,000 4,000 4,000 4,000 3,272
Pranotional
Contingency 2,000 2,000 1,000 1,000 1,000 730
Biennial
Conference 3,000
TOTAL 80,127 80,127 43,170 36,957 74,100 63,830
83.02.17
Page VII-8
1983 BUDGET ESTIMATES
DIVISION: Information and Education
PROGRAM Community Relations - Information - Resource Management Programs
PURPOSE:
To provide information td the general public and specific audiences with respect to Authority Resource Hanagement Programs.
1983 OBJECTIVES:
- To increase the number of technical/semi-technical bulletins published.
- To arrange for resource management tours and seminars.
FUNDING:
This is a shared program, 55\ of the funds being available from the Province of Ontario and 45\ being funded from the general
levy on all participating municipalities
FINANCIAL COMHENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Pro~ & Rents Taxes Expenses TOTAL
$ 9,500 1,500 11,000
83.02 iO
Page VII-9
1983 BlIXET ESTIHATFS
DIVISIOO: Infotmation aM B'lucation
Program I CalInlIlity Relations - Infotmation - Resource Hanaganent Programs
1983 BtIlGET SOURCES (F FINAOCING 1982 BtIlGE'l' 1982 ACTUAIS
ACTIVITY NET PROVIOCIAL K1NIC I PAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY 0'I1IER EXPEWITURES REVEtIJES EXPENDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
Watershed Plan
Projects
presentations
aM sani-
technical
publ ications
re Watershed
Programs 11,000 11,000 6,050 4,950 10,000 9,894
TOTAL 11,000 11,000 6,050 4,950 10,000 9,894
83.02.17
.
Page VII-IO
1?83 BUDGET ESTIHATES
DIVISION: Information and Education
PROGRAH: Community Relations - Information - Planning/Harketing Analysis
PURPOSE
To provide an effective communications program to maintain or increase visitation to Authority public use facilities.
1983 OBJECTIVES:
- To review and revise the communications program based on the results of studies during 1982.
- To implement a comprehensive marketing program.
FUNDING:
Funding is provided 100\ by municipal levy on all participating municipalities.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies' Real Services Financial
, Wages Ut i li ties Equipment Proper t,y & Rents Taxes Expenses TOTAL
$ 90,243 90,243
83.02 10
Page VII-11
1983 BlIX>ET ESTIMATES
DIVISION: Infonnation and Education
Program: CcmnlIlity Relations - Infonnation - Planning/Marketing Analysis
1983 BlIX>ET SOURCES (F FINMCIOO 1982 BtIlGE'l' 1982 AC'IUALS
ACl'IVITY NET PROVIOCIAL KJNIC I PAL
EXPENDITURES RE\lEWES EXPENDITURES GRANT LEVY OTHER EXPEN:>ITURES REVENUES EXI'EtJ)ITURES REVEHJES
11 11 11 ~ ~ ~ ~ 11 11 ~
Harketing Plan
and Research 36,000 30,860
Support 34,000 34,000 34,000 32,000 24,571
Supplies 24,500 24,500 24,500 18,000 21,668
Pranotion and
Advertising 31,743 31,743 31,743 39,000 47,161
roTAL 90, 243 90,243 90,243 125,000 124,260
83.02.18
I
.
Page VII-12
1983 BUDGET ESTIMATES
DIVISION: Information and Education
PROGRAM: Community Relations - Conservation Education - Supervision, Operations & Maintenance
PURPOSE
To provide ~n outdoor conservation education program for school student~ and other community groups at four (4) residential
conservation field centres an~ a variety of outdoor and conservation education opportunities for the general public and school
groups at Cold Creek, Bruce~s Hill and Black Creek.
1983 OBJECTIVES
- To continue the program at the same level of service as in 1982
- To provide an outdoor and conservation education program for the following estimated number of students and adults
Conservation Field Centres 13,500 (Residential)
Cold Creek, Black Creek & General Interpretive Programs 78,000
- To complete major maintenance at the Albion Hills Conservation Field Centre.
FUNDING
Program revenues and the general levy on all participating municipalities. A surplus or deficit on the operations of the Boyd
and Lake St. George Conservation Field Centres will, by agreement, be charged or credited to the participating Boards of
Education The cost of supervisory staff at Albion Hills, Boyd, Lake St. George and Claremont is funded by a 55% grant from
the Province of Ontario, 45% being funded from the general levy on all participating municipalities.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real Services Financial
& Wages utilities Equipment Property & Rents Taxes Expenses TOTAL
$ 679,900 90,000 19,000 484,183 1,273,083
83 02.18
Page VII-13
1983 BUDGET ESTIHA'ftS
DIVISION: Information and Blucation
Progrcm CamllIlity Relations - Conservation Blucation - Supervision, Operations and Haintenance
1983 ~ SOURCES (P FINAtCING 1982 BWGE'I' 1982 AC'l'UALS
ACTIVITY NET PROVItCIAL . KlNICIPAL
EXPENDITURES REVEOOES EXPENDITURES GRANT LEVY O'l1tER EXPENDITURES RE\IENlJF8 EXPEN)ITURES REVENUES
$ $ $ $ $ iii $ $ $ $
Program
Supervision 106,909 106,909 58,780 48,129 118,500 120,617
Boyd C. F .C. 228,000 228,000 147,000 147,000 222,586 213,784
Lake St. G!orge 443,000 443,000 287,000 287,000 406,552 415,354
Albion lUlls 203,000 203,000 191,000 191,000 197,967 188,860
,
Claranont 207,000 207,000 191,000 191,000 193,780 194,816
Cold Creek F.C. 37,300 37,300 40,000 40,000 38,237 38,159
Gen. Interpretive 18,000 18,000 17,800 17,800 14,475 16,992
B.C.P.V.
(Tours , PLP) * * 157,500 * 163,500 * (6,000) * 174,459 * 179,700 * 127,035 * 147,697
Hajor Htce.:
Albion 29,874 29,874 29,874 29,464 11,855
Claranont 16,000 17,753
TOrAL 1,273,083 1,136,300 136,783 58,780 78,003 1.037 764 873,800 1,223,822 1,067,965
* These amounts are included in the Historical Sites Division Budget, and do not add to totals here.
83.02.10
Page VII-14
1983 BUDGET ESTIHATES
DIVISION Information and Education
PROGRAM Community Relations - Conservation Education - Supervision, Operations and Maintenance _ Kortright
PURPOSE
To provide a conservation education program for the public, school and other community groups at the Kortright Centre for
Conservation.
1983 OBJECTIVES:
- To provide program opportunities to 15,000 visitors over 1982 level, bringing visitation to approximately 90,000.
FUNDING:
Direct program costs are funded from fees, revenues for services, food and sale of merchandise. Basic operations are funded
by a Ministry of Natural Resources grant of 55% on the Supervisor's salary, an H.T.R.C.F. grant of $11,500 from the Growth
Endowment Fund, with the remainder from the general levy on all participating municipalities.
FINANCIAL COHMENTS
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real ~ervices Herchandise
& Wag es Utilities Equipment Property & Rents for Resale TOTAL
$ 280,000 20,000 3,000 54,000 85,000 442,000
83.02.18
Page VII-IS
1983 BUDGET ESTIMATES
DIVISION: Infounation and D3ucation
Program: Caml\llity Relations - Conservation D3ucation - Supervision, Operations aM Haintenance - Kortright
1983 BUDGET 9JURCES <F FINAtCING 1982 BlDGET 1982 AC'l1JALS
ACrI VI TY NET PROVItCIAL K1NICIPAL
EXPEtIlITURES REVENUES EXPENDITURES GRANT LEVY 0'l11ER EXPEmITURES REVEWES EXPEmITURES REVENUES
$ 1) $ ~ ~ $ $ $ $ $
Basic Operations 142,000 142,000 19,140 85,310 37,550* 193,000 198,744
Programs -
General 300,000 264,850 35,150 35,150 200,000 232,150 201,787 219,918
1983 Portion of
the Renewable
Energy Program 183,493** 183,493 183,493 135,000 51,507
TOTAL 442.000 264,850 177 , ISO 19,140 120,460 37,550 393.000 232.150 400,531 219 918
* $11,450 Growth Endowment fUnd
26,100 H.N.R. Fish' wildlife Agreement
$37,550
** Hinistry of Energy fWlding for 1983 - amoWlt not included in totals.
83 02.18
Page VII-16
1983 BUDGET ESTIMATES
DIVISION: Information and Education
PROGRAM Community Relations - Conservation Education - Development
PURPOSE
To develop the facilities required for the Authority's outdoor and conservation education programs.
1983 OBJECTIVES
- To continue development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation;
- To develop additional indoor exhibits, furnishings and equipment for the Kortright Centre for Conservation
- To develop additional residential conservation field centre accommodation at Albion Hills to be funded by The Etobicoke
Board of Education.
FUNDING:
The outdoor development of the Kortright Centre for Conservation has been funded by a 55\ grant from the Province of Ontario,
and 45\ from the general levy on all participating municipalities until the end of 1981. provincial priorities did not permit
a grant from the Province of Ontario in 1982. Completion of the development of the Kortright Centre is required to meet
resource management objectives, to increase visitation by 20,000 per year, to meet inflationary and service costs and to
annually reduce the municipal levy. Funding for the outdoor development, exhibits, furnishings and equipment for this Centre
will be required from The Metropolitan Toronto and Region Conservation Foundation and other sources.
FINANCIAL COHMENTS:
OBJECTIVE CLASSIFICATIONS Haterials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL
$ 36,000 19,000 23,000 36,800 114,800
I 83 02 10
PageVII-17
1983 BlIXiET ESTIMATES
DIVISION: InfoDllation and D3ucation
progran: CamllIlity Relations - Conservation D3ucation - Developnent
1983 BIIX>E'l' OOURCES <F FINAOCING 1982 BmGE'l' 1982 J\CTUALS
ACTIVITY NET KlNIl:IPAL
EXPENDITURES REVEtlJES EXPENDITURES GRANT LEVY omER EXPENDITURES REVEHJES EXPENDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
KortrIght
Developnent 100,000 100,000 100,000* 100,000** 36,077
FurniShings,
Exhibits,
Equipnent 56,500
Conservation
Field Centre
General Upgrade 24,000**
Albion lUlls 14 , 800 14 , 800 9,600 5,200
TOTAL 114.800 114,800 9,600 105,200 180.500 36.077
E\mding sources UDcamlitted at tillS t:lme.
** provincial grant not approved.
83.02.17
.
Page VIII-l
1983 BUDGET ESTIMATES
TilE HISTORICAL BITES DIVISION
This Division is responsible for the Heritage Conservation program, including the development and
administration of the Black Creek Pioneer Village, Albion lIouse, historical markers and other historical
buildings coming under the jurisdiction of the Authority.
82.08 06
I
Page VIII-2
1982 ACHIEVEMENTS
Operated all buildings at Black Creek Pioneer Village with interpretive staff and maintained grounds with
own force and volunteer labour
Maintained and improved provision of special events and programs
Produced a comprehensive staff handbook
Reviewed results of visitor survey and developed recommendations to improve communications and visitor
services
Commenced a program of local community youth involvement through the assistance of the Federal government
Prepared an Operating Plan for Black Creek Pioneer Village for 1983-86.
.
1983 PRIORITIES
To continue to operate all buildings at Black Creek Pioneer Village with interpretive staff and maintain
grounds in a cost-effective manner
To increase public awareness of Black Creek Pioneer Village by increased communications with special
groups and local community
To maintain and improve programs and special events
To continue to develop staff skills in interpretation and conservation techniques.
To respond to visitor needs for improved food services, gift shop accommodation, student assembly and
student/public orientation
82 08 09
Page VIII-3
1983 BIDGET ESTIMATES
DIVISION: Historical Sites
1983 BlDGET OOURCES <F FINMCING 1982 BlIlGET 1982 ACTUALS
l'ROGRAH NET PROVItCIAL KlNICIPAL
EXPENDITURES REWaJES EXPENDITURES mANT LEVY OTHER EXPENDITURES REVEtlJES EXPENDI~ REVENUES
$ $ $ $ $ $ $ $ $ $
Program
Administration 273,122 273,122 94,843 178,279 248,700 260,599
Operations &
Haintenance 1,487,200 1,025,000 462,200 260,200 202,000 1,492,000 1,040,500 1,458,808 925,016 .
Conservation
Education -
Supervision 157,500 163,500 (6,000) (6,000) 174,450 179,700 127,035 147,697
Capi tal
Developnent 1,995,000 1,995,000 . 1,995,000 1,930,000 89,902
IDrAL 3,912,822 1,188,500 2,724,322 94 843 432.479 2,197,000 3.845.150 1.220 200 1.936,344 1,072,713
83.02.17
Page VIII-4
1983 BUDGET ESTIHATES
DIVISION: Historical Sites
PROGRAH: Heritage - Administration
PURPOSE:
To provide supervisory and support services to implement the heritage conservation program.
1983 OBJECTIVES:
- To provide the support services at the same level as in 1982
FUNDING:
Provincial ~nd m~nicipal fundipg. "
FINANCIAL COMHENTS:
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries sU111ies & Real Services Financial
6. Wages Ut Hies Equipment Property & Rents Taxes Expenses TOTAL
I $ 268,122 5,000 273,122
83 02 17
Page VI 11-5
1983 BlDGET ESTIMATES
DIVISION; Historical Sites
Program: Heritage - Administration
1983 BlIXE'l' SOURCES (J!' FINAN::ING 1982 BIDGE'l' 1982 ACroALS
ACTIVITY NET PROVIICIAL tIlNIC I PAL
EXPENDITURES REVmJES EXPENDITURES GWll' LEVY 0TffER EXPENDI1URES RIMHJEB EXPENDITURES REVENUES
Ii Ii Ii (I (I $ e $ Ii Ii
Sa1ades 45,000 45,000 22,500 22,500 40,900 43,076
Benefi ts 139,686 139,686 69,843 69,843 147,800 121,971
Travel 5,000 5,000 2,500 2,500 5,000 4,538
Vacation, Sick ,
Statutory
Holiday Pay 83,436 83,436 83,436 55,000 91,014
TOTAL 273,122 273,122 94,843 178.279 248.700 260,599
83.02.17
Page VII 1-6
1983 BUDGET ESTIHATES
DIVISION Historical Sites
PROGRAH: Heritage - Operations and Maintenance - Black Creek Pioneer Village
PURPOSE:
To provide a living portrayal of a crossroads village in pre-Confederation Ontario.
1983 OBJECTIVES:
- To continue to provide an educational, recreational experience for visitors to this heritage conservation project.
- To increase attendance by 15,000 over 1982.
- To provide a staff person to implement the recommendations of the 1982 marketing plan specific to the Village, particularly
through increasing communications to tourists, conventions and special groups.
- To continue to operate the Village in a cost-effective manner through reliance on existing staff, volunteer forces and
increased local involvement; to maintain visitor spending; to review food services.
- To develop and implement special events and programs to attract visitation.
- To provide staff development and training; maintain collection; review conservation techniques.
FUNDING
72\ of the funding comes from admission receipts, sales outlets and other Village operations.
The remainder comes from municipal levy (15 3\) and balance by grant from the Ontario Hinistry of Citizenship and Culture.
FINANCIAL COHHENTS:
The budget estimates include funding for the recommendations of the Black Creek Operating Plan prepared in 1982, including
enrichment of special programs and marketing staff.
OBJECTIVE CLASSIFICATIONS Haterials
Saliuies Supplies & Real Services Financial
& Wages Utili ties Equipment Property & Rents Taxes Expenses TOTAL
$ 934,100 266,900 286,200 1,487,200
83.02 09
I
Page VIII-7
1983 BWGET ESTlHATFS
DIVISION: IIistodcal Sites
Program: Heritage - Operations and Maintenance - Black Creek pioneer Village
1983 BWGET SOURCES CF FiNl\tCING 1982 BlIXE'l' 1982 AC'IU\LS
ACTIVITY NET PROVItCIAL ~ICIPAL
EXPENI)IroRES REVEtIJES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVEtIJES EXPENDlroRES REVENUES
~ $ $ ~ $ ~ $ IJ ~ $
Supervision 505, 100 3,000 502,100 345,100 157,000 445,000 5,000 434,264 2,403
Costume Dept. 23,500 1,000 22,500 22,500 22,500 1,000 25,766 761
Registrar 34,500 2,000 32,500 32,500 31,500 2,000 21,769 985
Gatehouse 24,500 505,000 (480,500) (480,500) 26,300 536,000 23,667 455,228
Giftshop-Entrance 130,200 205,000 (74,800) (74,800) 144,500 166,000 140,329 189,059
Giftshop-t\.lse\J1l 32,500 45,000 (12,500) (12,500) 60,400 80,000 37,131 39,538
h\:!ddings 8,800 20,000 (ll,200) (11,200) 11,500 22,000 12,601 18,772
Special Events 40,000 6,000 34,000 34,000 39,000 2,000 36,100 3,857
Livestock 91,000 4,000 93,000 93,000 88,500 5,000 95,176 3,107
Carpenter Shop 20,000 500 19,500 19,500 14,600 500 15,412 126
Peacock Woods 6,000 6,000 (4,000) 10,000 10,000 8,038
Food Operation 14,000 55,000 (41,000) (41,000) 14,000 50,000 36,910 43,545
Non-Designated
Areas 41,000 41,000 6,000 35,000 41,200 43,243
Sleigh Rides 500 3,000 (2,500) (2,500) 500 1,000 295 3,129
Building Activit. 509,600 175,500 334,100 334,100 542,500 170,000 527,507 164.506
TOTAL 1,487,200 1. 025.000 462.200 260.200 202 000 1.492.000 1.040,500 1,458,808 925.016
83.02.10
I
Page VI I 1-8
1983 BUDGET ESTIHATES
DIVISION: Historical Sites
PROGRAH: Heritage - Education Program
PURPOSE:
To provide conservation education opportunities for school groups by group tours and by a Pioneer Life program.
1983 OBJECTIVES:
To maintain existing levels of service for 60,000 students combined in both Tour and Pioneer Life Programs.
FUNDING
The program is planned to be self-sustaining.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS: Haterials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses TOTAL
pioneer Life Program 33,300 9,500 18,600 61,400
Educational Tours 84,050 7,200 4,850 96,100
83 02.09
Page VI II -9
1983 BWGE'l' ESTIHATES
DIVISION: Historical Sites
Program: Heritage - Edocation ProgrWl
1983 BWGE'I' SOURCES 00 PINAN::: ING 1982 BtDGB'l' 1982 AC'lUALS
ACTIVITY NET PRovnCIAL ~ICIPAL
EXPENDITURES REWtIJES EXPENDITURES GRAm' LEVY OTHER EXPENDITURES REVEtlJES EXPENDITURES REVENUES
~ ~ (J (J (J Ii (J (J (J ~
pioneer Li fe
Program 61,400 44,500 16,900 16,900 70,750 40,950 45,064 41,370
Edocational
Tours 96,100 119,000 (22,900) (22,900) 103,700 138,750 81,971 106,327
TOTAL 157,500 163,500 (6,000) (6,000) 174,450 179,700 127,035 147,697
83.02.09
Page VIII-10
1983 BUDGET ESTIMATES
DIVISION Historical Sites
PROGRAM Heritage - Capital Development
PURPOSE
To carry out restoration and development work at the Black Creek pioneer Village in accordance with approved plans.
1983 OBJECTIVES:
- To complete restoration of the Richmond Hill Hanse, Sawyers House and Nesbitt Sawmill.
- To dismantle the Tinsmith's Shop and reconstruct at the Village.
- To commence construction of the Visitors' Centre.
FUNDING
Funding sources for the capital development are expected to be the The Metropolitan Toronto and Region Conservation
Foundation, Wintario, and special municipal contributions for the Visitors' Centre.
FINANCIAL COHHENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages utili ties Equipment Property & Rents Taxes Expenses TOTAL
$ 1,995,000 1,995,000
83.02.09
.
Page VI 11-11
1983 BlDGET ESTIMATES
DIVISION Historical Sites
Program: lledtage - Capital Developnent
1983 BlIlGET SOURCES (F FINAtCING 1982 BUDGE'l' 1982 ACI'lIALS
ACTIVITY NET PROVItCIAL fiJNIC I PAL
EXPENDITURES REVEWES EXPEmITURES GRANT LEVY OTHER EXPENDITURES RIMHlES EXPENDITURES REVENUES
~ {J {J ~ ~ ~ ~ fj ~ !J
Nesbitt Sawnill 85,000 85,000 85,000 100,000 11,929
Visitors ~ntre 1,800,000 1,800,000 1,800,000 1,800,000 12,828
Tinsnith 75,000 75,000 75,000
RichnoM Hill
Manse and
Sawyers Ilouse 35,000 35,000 35,000 30,000 5,145
I
'IUl'AL 1,995,000 1,995.000 1,995,000 1. 930.000 89.902
83 02 09
SCHEDULE "B" B-21
In accordance with Rule #6 - Rules for the Conduct of the Author~ty, ReSO.l.ution
#88/75, as amended, the following are biographies of persons recommended for
appointment to functional advisory boards:
CONSERVATION LAND MANAGEMENT
BELL, R.E. -born at Gilford, Simcoe County~
-educated at Bradford High School and O.A.C. Guelph~
graduated in Agronomy in 1949~
-joined Ontario Ministry of Agriculture, Extension
Branch in 1949 ~
-1949-1952 - Assistant - Peterborough~
-1952-1960 - Woodstock - Oxford as Agricultural Rep.;
-1960-1963 - Assoc. Dir. of Exten. OMAF, Queen's Park~
-1963-1970 - Ottawa as Area Co-ordinator and Farm
Management Specialist for 14 Eastern Counties~
-1970 to present: Ag. Rep. in Peel at Brampton~
-member of Ontario Institute of Agrologists~
-served on Ref. & Land Use AS 1970-l977 inclusive~
-served on Cons. Land Mgt. AS 1978-l982~
-served on Conservation Farm SUb-Committee 1973-1982~
CALDWELL , S.W. -Member MTRCF - 1986-l972: Director MTRCF - 1973-1974~
VC M'I'RCF - 1975~ Director MTRCF 1976-l977~
-Appointed to MTRCA April 1976~
-served on Humber Valley and Reforestation and Land Use
Advisory Boards 1976-1977:
-Appointed to MTRCA by Govt. of Ontario July 1977-July
1980~
-served on Conservation Land Management & Humber
Valley Advisory Boards, & Conservation Farm Sub-
Committee 1978-81, and as member MTRCF 1978-l981~
-served on Information & Education and Humber Valley
Advisory Boards,' and Conservation Farm Sub-Committee
1982~
-retired Television executive~
-owner-operator of farm in Albion TownShip.
GARDHOUSE. GEORGE -born Toronto Gore Twp. and raised Chinguacousy Twp.:
-farmed at present location since 1950:
-Past President - Peel County Soil and Crop
Improvement Association~
-Past President - Peel County Junior Farmers'~
-served 14 years as Provincial Director, Ontario Soil
& Crop Improvement Association~
-Past President - Ontario Soil & Crop Improvement
Association ~
-nine years as member of Chinguacousy Twp Council:
-two years Deputy Reeve, Chinguacousy Township:
-served on Peel Committee Services Board:
-associated 18 years with MTRCA as Authority and
advisory board member~
-assisted Authority by permitting Streambank Erosion
Control Pilot Project to be undertaken on property
GURNEY , FRED -resident of Brampton area for four years:
-served two terms on the Heart Lake Residents'
Association Executive - still active as member~
-hunter and dog trainer~
-keen interest in conservation - uses natural
facilities of Claireville, Cold Creek, Glen Haffy,
and Heart Lake for training and leisure activities
t1cDEBMOT'l' , NEIL C. -graduated from University of New Brunswick with a
Bachelor of Science degree in Forestry - 1954:
-1954-1965 - worked with Detence Construction Ltd. at
Camp Gagetown, M.B , Canadian National Railways, and
about one year with the Santa Fe Railway in Los
Angeles:
-work in the above included such activities as timber
salvaging, surveying, and construction:
-since 1965, employed by the Department of Lands and
Forests (now Ministry of Matural Resources) - last 11
years as a Management Forester in the Maple District:
-since 1976, represented Maple District on MTRCA, and
also served on the Forestry Technical Review
Committee for the Kortright Centre.
/2
B-22
-2-
FLOOD CONTROL AND WATER CONSERVATION
.
GARDNER, MRS. F. EDNA -Member Board of Trustees of Ontario Science Centre;
-very active on Garden Club of Toronto;
-leading role in Garden Club project of landscaping
Black Creek Pioneer Village;
-played leading role in establishment of Garden
Centre, for which she was recognised by the Garden
Club;
-leading role in acquisition of James Gardens by
Metropolitan Toronto;
-member of Citizens' Advisory Committee of the
International Joint Commission;
-M.T.R.C.A. 1957-1982 served on Historical Sites,
Conservation Areas, Waterfront Advisory Boards;
-Finance, Wildlife, Honour Roll, Recognition, and
other Executive sub-committees: as Chairman and
Vice-Chairman of various advisory boards and
committees; Chairman of the Humber Valley Advisory
Board 1960-1982;
-M.T R.C.F. Member 1961-1967; Director 1968-1969;
Vice-Chairman 1970-1973; Director 1974-1982.
-
.
JAMES, PROF ROBERT L -Professor of Sociology at Scarborough College,
University of Toronto;
-formerly at University of Alberta, Montana State
University, University of Nevada, obtained Ph D.
at University of Oregon;
-Research Consultant - Alberta Home & School Assoc ;
-Research Association - Edmonton Council of Community
Services;
-Educational Consultant - Ministry of Education
(Family Life Studies);
-teaching interests - family;
-research vocational versus marriage and family
choices among senior public and secondary students
on Ministry of Education grant;
-presently resident of Scarborough; Canadian citizen;
-appointee to Information and Education Advisory
1977-1982.
. . /3
B-23
-3-
aISTORICAL SITES
BRADSHAW, JOHN -member of Historical Sites Advisory Board since 1974:
-garden commentator on C.F.R.B. for more than 30 years
-garden editor for several newspapers:
-honoured for his horticultural knowledge and writings
-active supporter of the Authority and the Black Creek
Pioneer Villages frequently publicizes activities of
Authority and Village on radio:
-Honourary Reeve of Black Creek Pioneer Village for
the years 1976 and 1977.
McGINNIS, BRIG.-GEN. JOHN -member of the ~echnical Advisory Committee and
Historical Sites Advisory Board since 1963:
-appointed Director of the newly-restored Fort Yor~
by Toronto Civic Historical Committee in 1952:
-presently Managing Director with the Toronto
Historical Board:
-actively involved with numerous military associations,
the Architectural Conservancy of Ontario, Heritage
Canada, Canadian Museum Association. the Company of
Military Historians, the John Graves Simcoe Memorial
Foundation, the American Association for State and
Local History, the Institute of Public Administration
of Canada, the Toronto-Amsterdam Twin City Committee,
and the Convention and Tourist Bureau of Metropolitan
Toronto.
MEIL, MRS. ELSA -member of the Technical Advisory Committee and the
Historical Sites Advisory Board since 1963:
-prior to 1963, played a major role as consultant to
the Humber Valley Conservation Authority in the
design and construction of exhibits at the Dalziel
Museum:
-created the original concept of Black Creek Pioneer
Village, and worked on its inception.
RUSSELL, OR. LORIS -member of the Technical Advisory Committee and
Historical Sites Advisory Board since 1964,
-specialist in palaeontology - 40 years researChing
prehistoric: life in western North America:
-retired from pOSition of Chief Biologist, Royal
Ontario Museum, in 1971, with title 'Curator Emeritus',
and is Professor Emeritus of the University of Toronto:
-began collecting historical material for Canadian
Centenary while serving as Director of the National
Museum of Canada:
-research led to several noteworthy publications -
detailed book on history of lighting in the 19th
century, and an account of 19th century crafts and
industries.
SCOTT, DR JOHN -member of the Eiistorical Sites Advisory Board since
1975:
-Director of Electroencephalographic Department at
Toronto General Hospital for 30 years:
-Professor of Physiology at University of Toronto:
-Chairman of Toronto Historical Board and Chairman of
the Museum Committee for the Academy of ~edicine:
-member of the Medical Historical Club of Torontor
-member of the Ontario Historical Societyr
--member of the York Pioneer and Historical Societyr
-member of the Canadian Society for the History of
Medicine:
-awarded the Medal of Service by the City of Toronto
in 1975
.
/4
B-24
-4-
INFORMATION AND EDUCATION
BROWN, C G. -B A degree in Honours Geography from University of Toronto
in 1951~
-graduate from Ontario College of Education in 1952
-specialist's certificate in geography~
-Secondary School Principal's Certificate~
-Teaching experience:
1952-54 teacher at Bathurst Heights Secondary School in
North York
1954-55 on leave of absence and taught in South America
1956-59 Head of Geography Department, Downsview Secondary
School in North York
. 1959-61 Assistant to Superintendent of Secondary Schools
for North York Board of Education
1961-63 Principal of Emery Collegiate Institute, North York
1963-67 Principal of Earl Haig Secondary School, North York
1967-69 Area Supe~visor in North York
1969-72 Superintendent of Programme & Instruction
1972-74 Assistant Director of Education, North York
1974- Director of Metropolitan Toronto School Board
-married with three children, and presently living in Toronto~
-appointee to Information and Education Advisory Board from
1975 through 1982
DOWNING, JOHN -political columnist for Toronto Sun~
-has worked for Toronto newspapers since 1958~
-has taken a number of environmental science courses at
University of Toronto~
-is journalism graduate of Ryerson Poly technical Institute:
-appointee to the Information and Education Advisory Board
1977-l982~
-Honourary Reeve of Black Creek Pioneer Village for 1978 and
1979~
-lives in Etobicoke with his~~ife and three sons
DUNLOP, W JOHN -appointee to Information and Education Advisory Board
since 1971~
-formerly Director of Public Service - Canadian Broad-
casting Corporation~
-education - Jarvis Collegiate Institute
- University of Toronto
-married with two children~
-active service with R C N V R ,
-National Chairman of Public Relations - Canadian Red
Cross Society, Canadian Cancer Society, Salvation
Army:
-member of fund-raising committees for disaster
appeals, including Indian Cyclone Relief Fund, of
which he was Chairman~
-member of Vatican Council II~
-on three occasions, has been International Broad-
casting Official for Her Majesty the Queen~
-Life Honourary Member of International Red Cross~
-Order of Distinguished Auxiliary Service for the
Salvation Army:
-has Gold Cross from Greek Red Cross~
-Chairman of sev~ral film festivals in Bulgaria, Puerto
Rico and Monte Carlo~
-former editor of 'Saturday Night' ~
-has Queen Elizabeth's Silver Jubilee Medal~
-member of Badminton & Raquet Club of Toronto and
Canadian Club of New York~
-presently living in Mississauga~
/5
-5-
INFORMATION AND EDUCATION
HUHN, MRS. C.C. -primary teacher, Scottish Board of Education:
-teacher, junior grades - Metro Separate School Board:
-Outdoor Education Consultantl Dufferin-Peel Separate
School Board:
-Secretary-Treasurer - K.D. Huhn Ltd. :
-1974-1982: Member Town of Caledon Public Library Board
-1978-19821 Vice-chairman of above Board: also Chairman
Finance Committee, Chairman Planning Committee: from
1978-1980 Chairman Personnel Committee:
-member Albion Bolton Community Centre Expansion Comm.:
-primary and secondary education: Scotland
-post graduate studies - Craiglockhart College of
Education: Humber College - Lanquages:
-other interests: Beaver Leader, Palgrave 1st: Softball
coach: Catholic Women's Leaque (Executive 1975-1980):
winter sports: travel.
-married with two children: husband Klaus D. Huhn,
President of K.D. Huhn Ltd.: K.D.H. Industries:
K.D.H. Services Ltd.: K.D.H. Services Ltd.
LEITH, DR. T.B. -Professor, Department of Natural Science, Atkinson
College, York University:
-B.A.(Honors) U. of T. Geophysics: M.A. U. of T
Geophysics: PLD M.I T. Geophysics: PLD Philosophy
(of Science): consultant to Ontario Centennial Science
Centre: Member Board of Governors of Seneca College of
Applied Arts &. Technoloqy: Member and Past Chairman
of Scarborough Public Library Board:
-Member of Philosophy of Science Association, History
of Science Association, American Geological Institute,
American Scientific Affiliation, American Association
for Advancement of Science, Society for the Sigma Xi,
Canadian Society for History &. Philosophy of Science:
-Member MTRCA 1975-1982: Member MTRCF 1977-1978:
Director-MTRCF 1979-1983:
-Member I&.E Advisory Board 1975-1979: Vice-chairman of
this Board 1978: Chairman 1979-1982:
-served on Don Valley Advisory Board 1975-1982:
-served on Personnel, Conservation Farm Sub-COmmittees:
-chair~n Marketing Plan Sub-COmm 1981-1982: Chairman
Renewable Energy (Kortright): Authority representative
to B Harper Bull Conservation Fellowship Award
Committee 1976 until appointment of successor
m:LLIGAN, B E -educated in Hamilton, Ontario, both elementary and
secondary:
-attended College of Education, University of Toronto
and obtained B.A. in 1945, and M Ed in 1960:
-teaching experience
Director of Guidance for Hamilton Sep Sch System
Master of Peterborough Teachers' College
Inspector of Separate Schools in Peterborouqh area
-Director of Education for Metropolitan Separate
School Board:
-member of Albion Bills Conservation School Management
Advisory Committee 1967 and 1968:
-member of Conservation Education Advisory Committee
1969 to 1972:
-appointee of Information &. Education Advisory Board
1973-1982:
-presented with Colonel Watson Award by Ontario
Association for Curriculum Development 1978:
-married with nine children, and presently living in
Toronto.
/6
-6-
INFORMATION AND EDUCATION
ZAJAC, MRS DOROTHY -Attended University of Toronto, graduating in 1956
in Physical and Health Education:
-Taught school for several years:
-Attended two-year public relations course "Friends of
Seneca" :
. -Trustee of York Region Board of Education for past
eight years:
-Past Chairman of the Board in 1980:
-Served as Chairman of Study Committee on Outdoor
Education;
-Married to a doctor: they have two sons - one studying
veterinary medicine, and the other working in the
field of conservation;
-Has travelled North American and European continents
extensively.
-served on Information & Education Advisory Board
1982:
WATERFRONT
BREEN, M J -Councillor, Village of Long Branch 1953-1958:
, -Board of Education 1958-1961;
-Founding Member & Past President Mechanical
Contractors' Association~
-Appointed by the Government to the Building Code
Commission for the Province of Ontario:
-Fourth generation of family to live whole lifetime in
Toronto area
-served on Etobicoke-Mimico Authority 1956;
-M T R C A - 1957-19821
-served on Etobicoke-Mimico Advisory Board~ Flood
& Pollution Control Advisory Board: Conservation Areas
Advisory Board: Personnel and Wildlife Sub-Committees:
Administrative Office SUb-Committee: Kortright
Building Sub-Committee; as Chairman and Vice-chairman
of various advisory boards and sub-committees;
Chairman of the Waterfront Advisory Board 1973-1982;
NORTON. G F R -served with R C N V R 1943-1945 inclusive:
-graduated University of Toronto, Civil Engineering
1952:
-represented Canada in sailing Olympics of 1960,
1968. 1972:
-Past Commodore of Royal Canadian Yacht Club:
-Past Vice-Chairman of Sail Ontario~
-Manager of Special Projects' Department at
Mollenhauer Limited
-member of APEO and Engineering Institute of Canada;
-Director of Board of Toronto Brigantine I'ncorporated
-Waterfront Advisory Board apointee 1974-1982 inc1 ;
-married with three children
B-27
SCHEDULE "C"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SALARIES AND WAGES
1983 Waqe Rates - Supplementary Food Service Staff
Onder 18 Over 18
Bus Person Level 1 $2.6S-3.00/hr $3.S0-3.75-4.00/hr
Cleaners Level II $2.65-3.00/hr $3.50-3.90-4.25/hr
Counter Server Level 1 $2.6S-3.00/hr $3.50 (Leadhand 4.00) (1)
Waiter/Waitress Level II $3.50 + tips (Leadhand
4.00)
Cashier Snack Bar Level I $3.7S-4.2S-4.S0/hr
Cashier Full Service Level II $3.75-4.S0-4.7S/hr
Bartender $4.00-4.7S-S.S0/hr
Assistant Cook $2.65-3.00/hr $3.50-4.S0-S.00/hr
2nd Cook Level I $S.SO-7.00/hr
1st Cook Level II $7.00-10.00/hr
Unit Assistant Level I $4.S0-S.S0-6.S0/hr
unit Assistant Level II (2) S6.50-7.00-7.S0/hr
Unit Assistant Level III (3) $3S0.00-36S.00-385.00/wk
Area Assistant (3) S350.00-36S.00-38S.00/wk
(1) Relief for Unit Assistant
(2) Equivalent to GOl
(3) Equivalent ;0 G03
KM/mrp
1982 02.09
I
.
1983 BUDGET ESTIMATES
DIVISION Finance and Administration
PROGRAM: Administration
PURPOSE To provide food services at the refreshment stands, Half Way House, Kortright
Centre for Conservation and the Conservation Field Centres
1983 OBJECTIVES - to provide a high quality food service that is attractive to all visitors,
- to maximize net revenue from the food operation.
FUNDING This program is funded from revenues
FINANCIAL COMMENTS: The net revenues will be used to offset operating and maintenance costs in the
areas where the revenues are produced
OBJECTIVE CLASSIFICATION: Materials .
Salaries Supplies & Real Services Financial
& Wages Utili ties Equipment Property & Rents Taxes Bxpenses TO'l'AL
[I)
0
ffl
0
Cl
f;;
bl
a I
0 to.>
a Q)
.
1983 DUDGET ESTIMATES Page
FOOD SERVICES
1983 BUDGET **
1982 ACTUALS
PROGRAM NET REVENUE NOTES
EXPENDITURES REVENUE (EXPENDITURES) EXPENDITURES REVENUE
~ $ ~ ~ ~
PROGRAM ADMINISTRATION 156,150* 156,150*
CONSERVATION LAND MANAGEMENT DIVISIO~
1 Refreshment Stands j
2 Group Catering 145,900 167,000 21,100 176,435* *
Sub-Total 145,900 167,000 21,100
HISTORICAL SITES DIVISION
1 Half Way House 259,000 290,000 31,000 308,631* *
2 Refreshment Stand 103,000 113,000 10,000 115,289* *
3 Group Catering (included in 1
and 2 above) Sub-Total 362,000 403,000 41,000
INFORMATION & EDUCATION DIVISION
1 Conservation Field Centres 259,417 259,417 294,813 294,813
2 Kortright Centre
(a) Refreshment Stand J
(b) Dining Room 46,000 56,000 10,000 * Shown seps ately here, bu included in
(c) Group Catering all expenc Otures
Sub~Total 305,417 315,417 10,000 ** 1983 BudgE: - March 1st tc Dee 31st/19 113
*** 1982 Actus s - January 10 to Dee 12/8
AUTHORITY GROUP CATERING 20,000 20,000
TOTALS 833,317 905,417 72,100
.
~ B-30
,
the metropolitan toronto and region conservation authority
minutes REPORT 12/83
EXECUTIVE COMMITTEE 9-MARCH-1983 .2/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 9-March-1983.
PRESENT
Chairman Mrs. F E. Gell
Vice-Chairman E.V. Kolb
Members. W.G. Barber
M.W.ft. Biggar
E. Fulton
Mrs. L. Hancl!y
H.C. Lawrie
S.A. Macpherson
Ms. S. Nimmo
J S. Scott
Mrs. N. Stoner
MINUTES
Res. 133 Moved by: Mrs. N. Stoner
Seconded by H.C. Lawrie.
THAT the Minutes of Meeting' tl/83 be approved.
CARR:):ED.
SEC'l'10N I
NO' ITEMS'
SEC'l'10N II
ITEMS FOR' CONSIDERATION
l. APPLICATIONS FOR PERMIT ONDER ONTARIO REGULATION 170
Res. .34 Moved by: Mrs. L. Hancey
Seconded by: Mrs. N. Stoner
THAT the applications listed. herein as A(l) to, A(8) inclus-i ve,. be. approved',
subject to the conditions. contained in the reports.,
CARRIED.
A(1) The Regional Municipality of Peel
To alter section of branch of the Etobicoke Creek south of'
Orenda Road, City of Brampton
Subj ect to:
(a) All work being done, in accordance wi th Sheet' 2,- Plan t4598-0,
as prepared' by- The Regional Municipali ty of Peel anq. dated'
January, 1981:
(h) All disturbed areas being restored to the satisfaction of the
Authority.
,
6-31 -2-
A(2) Markland Wood Country Club
To construct refreshment stand south of Bloor Street,
Borough of Etobicoke (Etobicoke Creek Watershed)
Subject to
All work being carried out in accordance with the site and
detail plans submitted with the application.
A(3) 372023 Ontario Limited
To place fill on the east side of Islington Avenue, south of
Finch Avenue, Borough of Etobicoke (Humber River Watershed)
Subject to:
All grading being carried out in accordance with the site plan
prepared by E I. Richmond Architects and dated January 7, 1983.
A (4) York Regional Roman Catholic Separate School Board
To construct storm sewer outfall into the Burndenette Creek to
drain St. Matthew School property at *75 Waterbridge Lane,
Onionville (Rouge River Watershed)
Subject to:
(a) All work being completed in accordance with Project ~8205,
Drawing #M-l, dated December 22, 1982, by McGregor Allsop Ltd.,
and Drawing SK-l dated February 28, 1983, by Bruno Appollonio,
Architect;
(b) All disturbed areas being restored to the satisfaction of the
Authority and the Town of Markham.
A(5) Sandgate Construction Ltd.
To build addition to building at t79-81 Main Str~et, Stouffvil1e
(Duffin Creek Watershed)
Subject to:
(a) All work being completed in accordance with Drawing ~768, dated
February 21, 1983, prepared by the applicant, which shall form
part of the permit;
(b) All disturbed areas being restored to the satisfaction of the
Authority
A(6) York Hannover Developments Ltd
To construct watermain crossing of the Etobicoke Creek, south
of Highway #401, east of Dixie Road, City of Mississauga
Subject to:
(a) All work being done in accordance with Drawing '1, prepared by
Orban Engineering COnsultants and dated January 17, 1983;
(b) All disturbed areas being restored to the satisfaction of the
Authority.
A(7) City of Mississauga
To construct two footbridges across the Mimico Creek, east of
Goreway Drive, north of Morning Star Drive, City of Mississauga
Subject to:
(a) All work being done in accordance with Drawing #22, prepared by
the City of Mississauga Recreation and Parks Department and
dated February, 1983;
(b) All disturbed areas being restored to the satisfaction of the
Author.i ty
-3- B-32
A(8) Schickedanz Brothers Limited
To construct storm water detention pond with low-flow channel and
outfall structure, east of Yonge Street, north of Hillsview Drive,
Town of Richmond Hill (Don River Watershed)
Subject to
(a) All work being done in accordance with Drawings Nos 22 and 27,
dated May and July, 1982, and prepared by M.M Dillon Limited;
(b) All disturbed areas being restored to the satisfaction of the
Authority
2. PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL
MUNICIPALITY OF PEEL
-1984 Erosion Control Program #2130 Dundas Street West and
#6469 Netherhart Road,
City of Mississauga
Res #35 Moved by M.W.H. Biggar
Seconded by E V Kolb
THAT the adopted recommendation by the Council of The Corporation of
the City of Mississauga at its meeting on February 14, 1983, with
respect to the Authority's Project for Erosion Control and Slope
Stabilization in The Regional Municipality of Peel, be received;
THAT the City of Mississauga be advised that the Authority will include,
in its 1984 Erosion Control Program, the erosion sites located at #2130
Dundas Street West and #6469 Netherhart Road;
AND FURTHER THAT remedial works will be carried out subject to the avail-
ability of funding
CARRIED
3 CITY OF BRAMPTON
-Request for Permanent Easement West of Scott Street in the
Rosalea Park Area
Res #36 Moved by J S Scott
Seconded by E V Kolb
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from The Corporation of the City of Brampton to grant a
permanent easement across Authority-owned land required to facilitate a
storm sewer in the Scott Street and Rosalea Park area;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with The
Corporation of the City of Brampton in this instance;
THAT a permanent easement, containing 0 051 acres, more or less, be granted
to The Corporation of the City of Brampton for a storm sewer located west of
Scott Street; said land being Part of Lots I and II, and Part of Scott
Street, Plan BR-15, City of Brampton (The Regional Municipality of Peel) ,
designated as Parts 1 and 2 on Plan 43R-I0529 Consideration to the nominal
sum of $2.00, pI us all legal, survey, and other costs;
THAT said easement be subject to an Order-in-Council being issued in accord-
ance with Section 21(c) of The Conservation Authorities Act, R S 0 1980,
Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
B-33 -4-
4 THE MUNICIPALITY OF METROPOLITAN TORONTO
-Request for Authority-owned Land For Re-alignment of Albion Road,
Vicinity of the Claireville
Conservation Area
Res 137 Moved by Mrs. N Stoner
Seconded by M W.H Biggar
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from The Municipality of Metropolitan Toronto to grant
a conveyance of Authority-owned land to facilitate the re-alignment of
Albion Road in the vicinity of the Claireville Conservation Area;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with
The Municipality of Metropolitan Toronto in this instance;
THAT a conveyance of 0 017 acres, more or less, be granted to
The Municipality of Metropolitan Toronto for the re-alignment of Albion Road
in the vicinity of the Claireville Conservation Area; said land being Part
of Lot 15, Concession IX, E H.S , City of Brampton (The Regional
Municipality of Peel), designated as Part 1 on Plan 43R-l0527
Consideration to be the sum of $2 00, plus all legal, survey, and other
costs;
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 2l(c) of The Conservation Authorities Act, R S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effec,t thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
5 LAND ACQUISITION PROJECT 1982-1984 ETOBICOKE CREEK WATERSHED
-Property Commercial & Home Builders Ltd ,
West of the West Mall, north of The Queensway,
Borough of Etobicoke
Res 138 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT the report (February 28, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorised and directed to complete the purchase
CARRIED
"Re Project; Land Acquisition Project 1982-1984 Flood
Plain & Conservation Land Component -
Etobicoke Creek watershed
Authority Executive Resolution 188, Meeting 14 -
April 8, 1981, and Authority Resolution
138, Meeting 13 - May 15, 1981
Subject property West of The West Mall
Owners Commercial & Home Builders Ltd
Area to be acquired 0 841 acres, more or less
Recommended purchase price Nominal consideration of $2 00, plus
vendor's legal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a larger property, being
Part of Lots 13 and 14, Concession III, CST" Borough of Etobicoke (The
Municipality of Metropolitan Toronto, located west of The West Mall and
north of The Queensway
-5- B-34
"Negotiations have been conducted with the owners and their solicitor,
Mr J R C Cermak, Q C , of Messrs Sm i th, Lyons, Torrance, Stevenson &
Ma ye r , Suite #3400, Exchange Tower, P O. Box 420, 2 First Canadian Place,
Toronto, M5X IJ3, and, subject to the approval of your Committee, agree-
ment has been reached with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2 00,
plus vendors' legal costs, with date of completion of the trans-
action to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements, are to be paid
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401 - Flood
Control Land Acquisition "
6 CONSUMERS' GAS COMPANY
-Occupancy of Authority-owned Lands East side Ellis Avenue, north of
Lakeshore Boulevard
Res 1139 Moved by Mrs N Stoner
Seconded by J S Scott
THAT the communication of The Metropolitan Toronto Clerk, dated February 16,
1983, concerning the occupancy of Authority-owned lands on the east side of
Ellis Avenue and north of Lakeshore Boulevard, be received;
AND FURTHER THAT the Metropolitan Toronto Clerk be advised that the
Authority concurs with the recommendation adopted by the Council of The
Municipality of Metropolitan Toronto at its meeting held February 15, 1983,
concerning this matter
CARRIED
7 QUOTATION #CLM83-09
-Two Log Splitters
The following quotations were received for the supply and delivery of two
new 1983 log splitters Roper Model W59AR, including applicable taxes
Roper Canada Limited $2,694 26
Nobleton Farm Service Ltd 2,993 86
A J Equipment Sales Ltd 3,199 09
Southam's Lawn Mower Service 3,209 89
Res #40 Moved by Mrs N Stoner
Seconded by Mrs L Hancey
THAT the quotation of Roper Canada Limited for the supply and delivery of
two (2 ) new 1983 log splitters, in the sum of $2,694 26, including all
applicable taxes, be accepted; it being the lowest proper quotation
received
CARRIED
8 QUOTATION #CLM83-10
-Four Riding Lawn Mowers
The following quotations were received for the supply and delivery of four
new 1983 model Riding Lawn Mowers, three with trade
B-35 -6-
Southam's Lawn Mower Service $16,478 00
Outdoor Power Equipment Inc. 17,521 51
A J Equipment Sales Limited 17,823 85
Snowball Enterprises (82 model) 17,932 45
Ken Maynard's Services Ltd 19,243 63
A J Equipment Sales Limited 19,392 29
Snowball Enterprises 20,325 97
Nobleton Farm Service 21,079 00
Henry's Lawn & Garden Equipment 21,400 00
Clark Moore Motors 22,079 45
Turf Care Products Limited 22,470 00
Otto Richter & Sons Equipment Ltd 23.329 25
Res. #41 Moved by Mrs N Stoner
Seconded by M W.H. Biggar
THAT the quotation of Southam's Lawn Mower Service, for the supply and
delivery of four (4) new 1983 model riding lawn mowers, in the sum of
$16,478 00, including all applicable taxes, be accepted; this being the
lowest quotation received
CARRIED
9 ENVIRONMENTAL ASSESSMENT REPORT EAST METRO TRANSPORTATION CORRIDOR
-Highway #402 to Proposed Highway #407
Mr M W H Biggar was absent during discussion of this item
Res #42 Moved by Mrs L. Hancey
Seconded by E V Kolb
THAT the staff communication regarding the Ministry of Transportation &
Communications Report for East Metro Transportation Corridor be received;
AND FURTHER THAT the Ministry of the Environment be requested to provide
copies of the "Type 1" Environmental Assessment Report on the proposed
East Metro Transportation Corridor (EMTC) to the Borough of Scarborough and
to the Chairman of the Authority's Rouge-Duffin-Highland-Petticoat Advisory
Board
CARRIED
10 HOUSE RENTAL POLICY TO DESIGNATED STAFF
Res #43 Moved by Mrs L. Hancey
Seconded by E V Kolb
THAT the rental rate for 1983 remain at $450 00 a month for the dwelling
occupied by the Superintendent of the Kortright Centre for Conservation,
and $500 00 a month for all other dwellings;
THAT the rental rate be reviewed annually, and up-dated, if necessary,
effective January 1, 1984;
THAT the rental rate be paid one-half in cash and one-half in
taxable benefit, implemented in two phases
January 1983 Superintendent of Kortright $200 rent/$lOO taxable benefit
Others $200 rent/$125 taxable benefit
January 1984 and subsequent years the full rental rate and any increase to
the rental rate will be divided equally between cash payment and taxable
benefit;
AND FURTHER THAT Resolution #43, as set forth herein, supersede Resolution
#236 of Executive Committee meeting held August 18, 1982
CARRIED
-7- B-36
11 1983 BIENNIAL TOUR - ONTARIO CONSERVATION AUTHORITIES
-Lakehead Region Conservation Authority
September 18-21, 1983
Res #44 Moved by M.W H Biggar
Seconded by S.A. Macpherson
THAT the staff communication, together with the memorandum received from the
Chairman of the Lakehead Region Conservation Authority, having regard to
the 1983 Ontario Conservation Authorities' Biennial Tour, be received for
information.
CARRIED
12. BLACK CREEK PIONEER VILLAGE
-Visitor Centre
Res #45 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the staff communication, together with the letter dated March 4, 1983,
received from The Honourable Bruce McCaffrey, Minister of Citizenship and
Culture, be received;
AND FURTHER THAT the Minister's letter, conveying approval of a Wintario
Capital Grant, in the maximum amount of $530,000 00, for construction of the
the Black Creek Pioneer Village Visitor Centre, be appropriately
acknowledged
CARRIED
NEW BUSINESS
13 1983 AMERICAN PLANNING ASSOCIATION NATIONAL PLANNING CO~FERENCE
-April 16-21, 1983 Seattle, Washington
Res #46 Moved by M W H Biggar
Seconded by W G Barber
THAT Mr Edward Fulton be authorized to attend the 1983 American Planning
Association National Planning Conference, scheduled to be held April 16-21,
1983, in Seattle, Washington;
AND ~URTHER THAT his expenses in connection therewith be paid
CARRIED
14 TERMINATION
On motion, the meeting terminated at 10 40 am, March 9
Florence Gell W E Jones
ChaIrman Secretary-Treasurer
KC
~ B-37
,
the metropolitan toronto and region conservation authority
minutes REPORT '3;83
EXECUTIVE COMMITTEE 23-MARCH-1983 '3;83
The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview,
on Wednesday, 23-March-1983.
PRESENT FOR THE HEARING
Chairman Mrs. F.E. Gell
Vice-Chairman E.V. Kolb
Members (For Ms. S. Nimmo) J.A. Bryson
E. Fulton
H.C. Lawrie
S.A. Macpherson
(For W.G. Barber) L. Martin
J .S. Scott
Mrs. N. Stoner
HEARING
Following the roll call, the meeting recessed to hold a hearing re
Mr Henry Natale
Town of Richmond Hill
Humber River Watershed
PRESENT FOR THE MEETING
Chairman Mrs. F E. Gell
Vice-Chairman E.V Kolb
Members M W.H Biggar
(For Ms S. Nimmo) J A. Bryson
E. Fulton
Mrs L Hancey
H.C Lawrie
S A Macpherson
(For W.G Barber) L. Martin
J S. Scott
Mrs N Stoner
ABSENT
Members W.G. Barber
Ms. S. Nimmo
MINUTES
Res. H7 Moved by: E.V Kolb
Seconded by Mrs N. Stoner
THAT the Minutes of Meeting #2;83 be approved. CARRIED.
SECTION I
NO ITEMS
SECTION II
ITEMS FOR INFORMATION
1. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res. H8 Moved by E.V Kolb
Seconded by: Mrs N. Stoner
THAT the applications listed herein as A(l) to A (4) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
B-38 -2-
A(l) Borough of Scarborough
To stabilize southern bank of Knob Hill Interceptor watercourse
behind ~94-#100 Citadel Drive (Highland Creek Watershed)
Subject to
All work being completed in accordance with drawings prepared
by the applicant, which shall fo~ part of the permit.
A(2) Borough of Scarborough
To stabilize banks of the Massey Creek, west of Kennedy Road,
between Foxridge Drive and Eglinton Avenue (Don River Watershed)
Subject to:
All work being completed in accordance with drawings prepared
by the applicant, which shall fo~ part of the permit.
A(3) Candevcorp Limited
To erect commercial building on north side Highway #7
(Wellington Street), west of the Kennedy Road By-Pass, unionville
Town of Markham (Rouge River Watershed)
Subject to:
All works being completed in accordance with Project #8253,
Drawing Al, dated March 7, 1983, by William Azzalino, Architect,
as amended, and a detail of the guardrail around the parking lot,
which shall form part of the permit.
A(4) The Municipality of Metropolitan Toronto Works Department
To construct gabion retaining wall on west bank of the Etobicoke
Creek, south of Dundas Street East, City of Mississauga,
Subject to
All work being carried out in accordance with Drawing #1239-D-II029,
as prepared by The Metropolitan Toronto Works Department
2 LAND ACQUISITION PROJECT 1982-1984 ROUGE RIVER WATERSHED
-Property Corporation of the Town of Pickering
West of Altona Road, north of Highway #2,
Res #49 Moved by: Mrs L. Hancey
Seconded by: M.W H. Biggar
THAT the report (March 15, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorised and directed to complete the purchase
CARR !ED
"Re Project Land Acquisition Project 1982-1984 Flood
Plain & Conservation Land Component -
Rouge River watershed
Authority Executive Resolution #88, Meeting H -
Apr il 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property West of Altona Road
Owners Corporation of the Town of Pickering
Area to be acquired o 702 acres, more or less
Recommended purchase price Nominal consideration of $2.00, plus
vendor's legal costs
-3- B-39
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being part of Lots 33 and 34, Range 3, B.F.C., Town
of Pickering (The Regional Municipalify of Durham), located west of Altona
Road, north of Highway t2.
"Negotiations have been conducted with officials of the Town of Pickering,
and, subject to the approval of your Committee, agreement has been reached
with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2.00,
plus vendor's legal costs, with date of completing the trans-
action to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-11-401 - Flood
Control Acquisition."
3. QUOTATION iCLM83-06A
-5 New 1983 Trucks
The following quotations were received for the supply and delivery of
five new 1983 trucks, complete with cab, chassis, and platform (two 1-ton
and three 3/4-ton trucks), and including licences, except where noted
Yorkview Ford Sales $74,940 46
H A. McLean Chev Olds Ltd. 76,599.16 + licence
Eric Matson Motors Ltd 77,042.69
Kinnear Pontiac Buick Ltd. 77,725.45
GMC Truck Centre 78,655.59
Thorncrest Ford Sales Ltd 81,037.70
Res i50 Moved by M.W.H. Biggar
Seconded by S.A Macpherson
THAT the quotation of Yorkview Ford Sales for the purchase of five new 1983
trucks, in the sum of $74,940 46, including licence and all takes, be
accepted; it being the lowest quotation received
CARRIED
4 QUOTATION iCLM83-11
-1 New 1983 Three-Furrow Plow
The following quotations were received for the supply and delivery of one
new 3-furrow plow
Edwards Equipment $1,350 00
West Metro Ford 1,500.00
Ken Maynard 1,700 00
Nobleton Farm Service 1,800 00
Don Vallance Equipment 1,850.00
Res i51 Moved by M.W H Biggar
Seconded by S.A Macpherson
THAT the quotation of Edwards Equipment for the supply and delivery of one
new 3-furrow plow, in the sum of $1,350 00, including Federal Sales Tax, be
accepted; it being the lowest quotation received
CARRIED
5 QUOTATION iCLM83-12
-1 new 1983 Self-Propelled Rotary Lawn Mower
The fOllowing quotations were received for the supply and delivery of one
new 1983 36" self-propelled mower
B-40 -4-
Turf Care Products Ltd. $2,925 00
Duke Lawn Equipment 3,200.00
Outdoor Power Equipment 3,300.00
Bannerman Ltd. 3,300.00
Res #52 Moved by: H.C Lawrie
Seconded by J.A. Bryson
THAT the quotation of Turf Care Products Ltd , for the supply and delivery
of one new 36" self-propelled mower, in the sum of $2,925.00, plus
Provincial Sales Tax, be accepted; it being the lowest quotation received
CARRIED.
6. QUOTATION #CLM83-13
-Rental of Pick-Ups, Vans, and Crew-Cabs
Of eleven quotations invited, two were unable to supply pick-ups or crew-
cabs, and eight were unable to quote The following quotation was
received for the rental of seven pick-ups, six crew-cabs, and one van:
SUPPLIER Pick-ups Vans Crew-Cabs
Sommerville Car & Trucks Limited $385 00 $385 00 $500.00
inclusive of 7% provincial Sales Tax
$45.00/month insurance
1,000 free kilometers/month; excess charge is
10e/kilometer
Res ~53 Moved by S.A. Macpherson
Seconded by Mrs N. Stoner
THAT the quotation of Sommerville Car & Truck Limited for
Seven (7) Pick-ups at $385 00 + 7% PST + $45 00 insurance a month;
Six (6) Crew-Cabs at $500 00 + 7% P S.T + $45.00 insurance a month; and
One (1) Van at $385.00 + 7% PST. + $45 00 insurance a month;
which includes 1,000 free kilometers a month, with excess charges at 10e
a kilometer, be accepted; this being the only supplier to meet the tender
requirements, and being the lowest quotation received
CARRIED
7 AUTHORITY FOOD SERVICES
-Purchase of Eggs
Mr Kolb declared a conflict, and was absent during discussion of and voting
on this item
Res #54 Moved by Mrs. N Stoner
Seconded by: J A Bryson
THAT the contract for the purchase of eggs for Authority food services, as
required, be awarded to Mrs. Beryle Kolb;
AND FURTHER THAT the price be based on the average price paid at other
locations.
CARRIED.
8 REPORT OF THE STAFF SUB-COMMITTEE ON AMENDMENT
OF THE CONSERVATION AUTHORITIES ACT
Res #55 Moved by Mrs. L. Hancey
Seconded by M.W H. Biggar
THAT the report on the "Report of the Staff Committee on the Amendment of
the Conservation Authorities Act" be received and forwarded to the Executive
Director of the Association of Conservaiton Authorities of Ontario for
consideration
CARRIED
-5- B-41
9 DECISION OF HEARING
-Mr Henry Natale
Town of Richmond Hill
Humber River Watershed
Res. #56 Moved by: J S. Scott
Seconded by S.A. Macpherson
THAT the application of Mr Henry Natale, in accordance with
Ontario Regulation 170, for permission to construct a building
in an area susceptible to flooding during a Regional Storm,
south of the King Sideroad and west of Yonge Street in the Town
of Richmond Hill (Humber River watershed), be approved, subject
to
The applicant submitting to the Authority a more detailed
site plan which will show existing and proposed grades,
finished floor elevations, and openings to structures,
prior to issuance of a permit in accordance with Ontario
Regulation 170
CARRIED
OTHER BUSINESS
10. Res. #57 Moved by Mrs. N. Stoner
Seconded by E. Fulton
THAT the Executive Committee consider certain personnel matters
in camera
CARRIED.
ll. Res. ~58 Moved by E. Fulton
Seconded by Mrs. N. Stoner
THAT the report concerning leave of absence of Mr. K.G. Higgs be received;
and the recommendations contained therein, as amended, be approved;
THAT the report be signed by the Chairman and the Secretary-Treasurer and
filed;
AND FURTHER THAT a copy of the report be delivered to Mr Higgs.
CARRIED
12. TERMINATION
On motion, the meeting terminated 11 30 a.m , March 23
Florence Gell W.E. Jones
Chairman Secretary-Treasurer
KC
~
, B-42
the metropolitan toronto and region conservation authority
minutes REPORT 14/83
EXECUTIVE COMMITTEE 6-APRIL-l983 #4/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 6-April-1983.
PRESENT
Chairman Mrs.. I!'.E. Gell
Vice-Chairman E.V. K01b
Members M.W.H. Biggar
E. Fulton
Mrs'. L. Hancey
H.C. Lawrie
S.A. Macpherson
(For W.G. Barber) L. Martin
Ms. S. Nimmo
J S. Scott
Mrs. N. Stoner
ABSENT
Member W. G. Barber
MINUTES
Res. #59 Moved by: t.. Martin
Seconded by: H.C'. Lawrie
THAT the Minutes of Meeting. #3/83 be approved.
CARRIED .
CORRESPONDENCE
Mr. W.A. McLean,. Acting. General Manager, reported receipt of the following'
correspondence:.
(a) Letter dated March 16, 1983, from the Metropolitan Toronto Clerk adviSing
that. "Prior to preparation of the- 1984-1988 Capital Programme, the General
Manager of the' Conservation Authority, the Commissioner of Parks and
Property, and the Commissioner of Management Services:-- examine the role
and objectives. of conservation prollrammes in Metro, with particular emphasis
on waterfront development~ enter into discussionS". wi th the Province' on the
issue o~ increased and longer term subsidy commitmentS"; and present a report
on: the' above to the- Parks, Recreation and Property Commi ttee ..'"
Mr. McLealle informed the, commi ttee- that he. had requested the Administrator"
Water Resource Division,. to place thiS" matter on the- agenda of the.
Waterfront Advisory Board meetin~' scheduled for April ll, 1983..
(b) Letter dated, March 22',. 1983', from- th8' Borougi't of Scarborough' ~erk
concerning' Council. resolution of March- 21,. 1983" that the- Ministry of
Natural Resources be requested to. give. high priority and provide- necessary
funding assistance. to ensure. early completioO" of the. Authori ty' s. proposed
channel. improvemen.ts on. the: Highland Creek.
Mr McLean recommended that a. letter be-' forwarded' to the Borough, in
acknow.ledqment and appreciation of. their assistance.
Res #60 Moved by: M.W.H. Biggar
Seconded by: E. Fulton
THAT the- report. of the Acting General Manager, together- wi tit correspondence, noted
in (a') and: (b) above, be.. recei ved.
CARRIED.
B-43 -2-
CORRESPONDENCE (Contd.)
(c) Letter dated March 29, 1983, from Ministry of Natural Resources, advising
that the "optional level of delegated authority" has been granted to the
M.T.R.C.A., and that a meeting will be convened in the near future
concerning the responsibility and accountability to be assumed by the
Authority as. a result of the delegated Authority
Res. #61 Moved by: Mrs. L. Hancey
Seconded by: J.S Scott
THAT the Chairman, the Acting General Manager, and the Secretary-Treasurer be
authorised to meet with representatives of the Ministry of Natural Resources in
connection with the optional level of authority granted by the Ministry to the
The Metropolitan Toronto and Region Conservation Authority.
CARlU ED .
SECTION I
ITEMS FOR CONSIDERATION
1. REPORT 11/83 - FLOOD CONTROL AND
WATER CONSERVATION ADVISORY BOARD
Res. #62 Moved by: Mrs N. Stoner
Seconded by J.S. Scott
THE EXECUTIVE COMMITTEE RECOMMENDS THAT a "Project for Flood Protection
Dykes - Duffin Creek, Towns of Pickering/Ajax, The Regional Municipality
of Durham - March, 1983", as appended as Schedule "An of these Minutes,
be approved;
AND FURTHER THAT the following action be taken in connection therewith
(a) The Regional Municipality of Durham be designated benefiting
mu~icipality on the basis. set forth in the project;
(b) The Government of Ontario be requested to approve the project
and a grant of 55% of the cost thereof;
(c) Pursuant to Section 23 of the Conservation Authorities Act,
approval of the Ontario Municipal Board be requested, if required;
(d) When approved, the appropriate Authority officials be authorised
to take whatever action is required in connection with the project,
including the execution of any documents
CARRIED
SECTION II
ITEMS FOR INFORMATION
2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res. '63 Moved by: Mrs. L. Hancey
Seconded by: Mrs. N. Stoner
THAT the applications listed herein as A(l) t~ A(8) inclusive, be approved,
subject to the conditions contained in the reports.
CARRIED.
A(l) Alfred & Ortrun Piwek
To straighten small section of the Miller Creekr south-west corner
Concession Line 3 and Harwood Road, Town of Ajax (Duffin Creek
Watershed)
Subject to
All work being completed in accordance with drawings dated March,
1983, prepared for the applicant by The Regional Municipality of
Durham, and which shall form part of the permit.
,
-3- B-44
A(2) George wimpey Canada Ltd
To construct storm sewer outfall into Lake Ontario, west of
Finely Avenue, Town of Ajax (Waterfront)
Subject to
(a) All work taking place in accordance with drawings Al-81730-PIO,
Al-81730-Gl, and Al-81730-G9, dated July, 1981, by Proctor and
Redfern Ltd , which shall form part of the permit;
(b) An easement being obtained on behalf of the Town of Ajax for
access to Authority lands
A(3) Comfort Living Co-op
To place fill within regulated area, east side Islington Avenue,
200 metres south of Finch Avenue, Borough of Etobicoke (Humber
River Watershed)
Subject to
All grading being carried out in accordance with the grading plan
prepared by Landscape Planning Ltd. and dated February, 1.983
A (4) Mr & Mrs. John Valente
To construct addition to dwelling, south of Major Mackenzie Drive,
west side Highway #27 (known as #43 Broda Drive), Town of Vaughan
(Humber River Watershed)
Subject to
All work being carried out in accordance with the detailed con-
struction drawings which shall form part of the permit
A(5) Crimson Maple Tree Inc
To excavate and grade parcel of land on east side Albion Road at
Armel Court, Borough of Etobicoke (Humber River Watershed)
Subject to
All grading being carried out in accordance with Drawing U,
Site Plan, as prepared by Allan E Jessop, Architect, and dated
October 4, 1982
A(6) Mr Brent Orser
To construct building south of North Lake Road, east of Yonge
Street, Town of Richmond Hill (Humber River Watershed)
Subject to
All work being done in accordance with the site plan forming part
of the permit
A(7) Mrs C Petrilli
To construct building south of North Lake Road, east of Yonge
Street, Town of Richmond Hill (Humber River Watershed)
Subject to
All work being done in accordance with the grading plan dated
May 3, 1979 and prepared by Mitchell & Perry Limited
A(8) Parwest Construction Ltd
To construct sanitary sewer crossing of the Robinson Creek,
south of Langstaff Road, west of Kipling Avenue , Town of Vaughan
Subject to
All work being carried out in accordance with the plans prepared by
Mi tchell , Pound & Braddock Ltd , which wi 11 form part of the permi t
B-45 -4-
3 PROJECT FOR EROSION CONTROL & SLOPE STABILIZATION IN
METROPOLITAN TORONTO - 1982-1984
-Proposed remedial work at rear of Nos 12-30 Beaucourt
Road, Borough of Etobicoke (Mimico Creek Watershed)
Res. #64 Moved by Mrs N Stoner
Seconded by S.A Macpherson
THAT erosion control remedial work be carried out at the rear of Nos
12-30 Beaucourt Road, Borough of Etobicoke, at an estimated cost of
$124,500 00;
THAT the benefiting owners provide the Authority title to their lands where
the main gabion structure is located;
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested
CARRIED
4 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED
-Property The Municipality of Metropolitan Toronto
West side Don Valley Parkway, north of
Millwood Road, Borough of East York
Res #65 Moved by Mrs. L Hancey
Seconded by S A Macpherson
THAT the report (March 28, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorised and directed to complete the purchase
CARRIED
"Re Project Land Acquisition Project 1982-1984 - Flood
Plain and Conservation Land Component
Don River watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property West side Don Valley Parkway, north of
Millwood Road
Owner The Municipality of Metropolitan Toronto
Area to be acquired 29 634 acres~ more or less
Recommended purchase price Nominal consideration of $2 00
"Included in the requirements for the above-noted project are two
irregularly shaped parcels of land located on the west side of the Don
Valley Parkway, north of Millwood Road, being Parts of Lot 11, Concession
III, F T B , Part of Allowance for Road between Lots VI and XI, Concession
III, F T B , and Part of the Bed of the Don River, Borough of East York
(The Municipality of Metropolitan Toronto)
"Negotiations have been conducted with officials of The Municipality of
Metropolitan Toronto,and, subject to the approval of your Committee,
agreement has been reached with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2 06,
with date of completing the transaction to be as soon as
possible
"I recommend approval of this purchase, and that the legal firm Gardiner,
Roberts be instructed to complete the purchase All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid The Authority is to receive conveyance of
the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401 - Flood
Control Acquisition "
-5- B-46
5 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED
-Property Gonte Construction Limited, et al
East of Dufferin Street, north of Steeles
Avenue, Town of Vaughan
Res #66 Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT the report (March 23, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
"Re Project Land Acquisition Project 1982-1984 - Flood
Plain & Conservation Land Component Don
River watershed
Authority Executive Resolution #88, Meeting H -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property East of Dufferin Street, north of Steeles
Avenue ,
Owner Gonte Construction Limited, et al
Area to be acquired 0 174 acres, more or less
Recommended purchase price Nominal consideration of $2 00
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being All of Block 84, Plan 65M-2154, Town of Vaughan
(The Regional Municipality of York), east of Dufferin Street, north of
Steeles Avenue
"Negotiations have been conducted with the owner and its solicitor,
Mr D.av id J Green, 399 Spadina Avenue, Toronto, Ontario, M5T 2G5 and,
subject to the approval of your Committee, agreement has been reached with
respect to a purchase price, as follows
The purchase price is to be the nominal sum of $2.00, with date
of completing the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401 - Flood Land
Acquisition "
6 TOWN OF AJAX
-Request for Authority-owned land north-east corner Elizabeth Street
and Highway #2 (Duffin Creek)
Res #67 Moved by Mrs N Stoner
Seconded by J S Scott
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Town of Ajax to convey a small parcel of
Authority-owned land;
AND WHEREAS it is the opinion of the Authori ty that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with the
Town of Ajax in this instance;
THAT a small parcel of Authority-owned land, containing 0 5 acres, more or
less, be conveyed to the Town of Ajax said land being Part of Lot 16,
Concession II, Town of Ajax (The Regional Municipality of Durham); con-
sideration to be the nominal sum of $2 00, and any other costs involved in
completing this transaction;
B-47 -6-
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act, R.S O.
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorised and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and execution of any
documents
CARRIED
7 COLONEL SAMUEL SMITH WATERFRONT PROJECT
-Controlled Access System
Res. #68 Moved by M W H Biggar
Seconded by S A. Macpherson
THAT staff be authorised to retain the services of C P E. Industries for
the supply and installation of a controlled access system for the Colonel
Samuel Smith landfill development project, at an estimated cost of
$22,981 00
CARRIED
,
8. REPORT H/83 - TENDER OPENING SUB-COMMITTEE
-Colonel Samuel Smith Waterfront Project - Entrance Road
-Humber Bay West Waterfront Project Launching Ramp Parking Lot
Res #69 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT Report #1/83 of the Tender Opening Sub-Committee and staff reports
having regard to (a) Colonel Samuel Smith Waterfront Project Entrance Road
and (b) Humber Bay West Waterfront Project Launching Ramp Parking Lot, as
appended as Schedule liB" of these Minutes, be received;
THAT the tender of Ferpac Paving Inc , in the amount of $54,584 60 for the
entrance road paving at Colonel Samuel Smith Waterfront Park be accepted,
it being the lowest tender;
THAT the tender of Gazzola Paving Limited, in the amount of $100,446 08 for
the launching ramp parking lot at Humber Bay West be accepted, it being the
lowest tender;
AND FURTHER THAT approval of the Province of Ontario be requested
CARRIED
9 KORTRIGHT CENTRE FOR CONSERVATION
-Proposal & Quotation Theatre Seats
The following proposals and quotations have been received for the supply,
delivery, and installation of theatre seats at the Kortright Centre for
Conservation
Price per Chair
(includes F S T Deli very and
and PST.) Installation
Hussey Seating Co Ltd $111 04 13 weeks
Irwin Seating Co 120 50 8 weeks
Canadian Chair Services Ltd 125 38 4 weeks
Res #70 Moved by Mrs L. Hancey
Seconded by J S Scott
THAT the proposal and quotation of Hussey Seating Co Ltd for the supply,
delivery, and installation of theatre seats at the Kortright Centre for
Conservation, in the amount of $111 04 per chair (including F S T and
PST ) be accepted, it being the most satisfactory proposal and lowest
quotation received
CARRIED
-7- B-48
10 MINISTRY OF NATURAL RESOURCES' AUDIT
OF 1980 EXPENDITURE REPORTS
Res #71 Moved by Mrs N. Stoner
Seconded by S A Macpherson
THAT the staff be authorised and directed to issue a cheque to the
Treasurer of Ontario in the amount of $86,866 37 as full payment of the
Ministry of Natural Resources' audit of this Authority's 1980 Expenditure
Reports
CARRIED
OTHER BUSINESS
11 MATTERS ARISING FROM THE MEETING OF THE BUDGET
AND FINANCE SUB-COMMITTEE MEETING #l/83
Res #72 Moved by J S. Scott
Seconded by Mrs L. Hancey
THAT the Minutes and report of Budget & Finance Sub-Committee Meeting #1/83
be received
CARRIED
Res. #73 Moved by J S Scott
Seconded by Ms S Nimmo
THAT, in this instance, and in the interests of keeping our members
informed, a copy of the draft Memorandum of Recommendations - 1982 be
provided to those members of the Budget & Finance Sub-Committee requesting
same, as soon as staff comments have been incorporated in the document
CARRIED
Motion Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT the members of the Budget & Finance Sub-Committee be advised that the
Accounts Payable printout are available for examination in 1;he Finance &
Administration Division
THE MOTION WAS ----------------------------------------------- NOT CARRIED
Res #74 Moved by J S Scott
Seconded by Mrs N Stoner
THAT the Accounts Payable printout be provided, on request, to any member of
the Authori ty
CARRIED
12. TERMINATION
On motion, the meeting terminated at 12 30 P m , Apr il 6
Florence Gell W E. Jones
Chairman Secretary-Treasurer
KC
B-49
SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
~
PROJECT
FOR
FLOOD PROTECTION DYKES - DUFFIN CREEK
TOWNS OF PICKERING/AJAX
REGIONAL MUNICIPALITY OF DURHAM
MARCH, 1983
-
E-SO
CONTENTS OF BRIEF
Page
PURPOSE 1
LOCATION AND DESCRIPTION 2
HISTORY OF FLOODING 5
PROPERTY REQUIREMENTS 7
COSTS AND FINANCING 8
APPROVALS 9 ,
8-51
- 1 -
PURPOSE
~ The purpose of this project is to permit The Metropolitan Toronto and Region
Conservation Authority to exercise the powers afforded by The Conservation
Authorities Act R S 0 1970. Chap 78 as amended to establish and undertake in
the area over which it has jurisdiction. a program designed to further the
conservation. restoration, development and management of natural resources in
accordance with the Flood Control Program of the Watershed Plan
The purpose of this project is to meet one of the defined objectives of the
Flood Control Program which is
to provide in defined flood damage centres, on a priority
basis, protection that will reduce the risk of flooding to
less than 50% over the life (100 years) of the affected
structure(s) Protection to a higher level will be
provided if economically and/or socially justified
The achievement of this objective in the Pickering/Ajax Damage Centres will also
achieve the goal of the Authority's Flood Control Program which is defined in
the Authority's Watershed Plan as
"To undertake a comprehensive program of Flood Control
Designed to Prevent, Eliminate, or Reduce the Risk of
Hazard to Life and Property, while cognizant of the
Natural Attributes of the Valley System "
Through this project, the Metropolitan Toronto and Region Conservation Authority
will implement dyking along the Main and West branches of the Duffin Creek
through the Towns of Pickering and Ajax The completion of the dyking works
will reduce considerably the risk of flood hazard to the communities This
project will be undertaken in accordance with the requirements of The
Environmental Assessment Act
B-52
- 2 -
LOCATION AND DESCRIPTION
In the development of the Flood Control Program for the Watershed Plan, the
Authority identified those areas of development concentrations within the
floodplain which formed integral parts of existing communities These areas
were defined as Damage Centres and inherent in this definition is a
susceptibility to flooding to the extent where potential damages and community
disruption are significant Based on a ranking of such factors as expected
damage. threat to life, disruption of transportation routes, etc , the Damage
Centres were ranked on a priority basis in order that the Authority could
achieve its objective of providing flood protective works to these flood
vulnerable areas in a sequence based on degree of hazard
In this regard, the Authority identified the Pickering/Ajax area as a Damage
Centre and ranked it 4th out of 14 sites This relatively high ranking is due
to the frequency of flooding and the potential for more severe flooding
The proposed works to be carried out in accordance with this project will
involve the floodplains of both the Main and West Branches of the Duffin Creek
through the Towns of Pickering and Ajax (Fig 1) A substantial amount of
development in both Pickering and Ajax is located within the floodplain of the
Duffin Creek This development is primarily the older established portion of
the communities which as in most other communities historically located next to
the rivers for power, navigation and water supply The river at this point
flows through a large ill-defined valley. with wide flat overbanks These
overbank areas are susceptible to flooding on an almost annual basis A
detailed description of the flood history of this area is provided in the next
section entitled History of Flooding
The limits of the Pickering/Ajax Damage Centres were identified on the basis of
the area which would be flooded by the Regional Storm as per Fig 2 In
accordance with the Authority's stated objective of providing at least a minimum
level of protection to those Damage Centres which had a risk of flooding greater
than 50% over an assumed life of 100 years, those areas which do not meet this
criterion are located within the 1 150 year flood line as shown on Fig 3
The preliminary engineering study carried out to study the flooding problem
recommended a solution to provide this minimum level of protection and also
recommended that a higher level of protection could be justified This higher
level would reduce the risk of flooding to 18% or protection to the 1 500 year
flood event The areas flooded by the 500 year flood event is shown on Fig 4
These recommendations were based on an analysis of the costs and benefits
associated with the proposed works A summary of the damages associated with
various flood frequencies is provided in Table I
~
B-53 I
I
I ;n
I <'
I '"
;n
I (J)
0
I '"
I TOWN
I c OF
I ;n
I AJAX
'" I
;n
0 I
(")
"
I
;n I
" I
I
I
I
I /--........
I / --,
I \
\
,
\ ,
I
I
I
KINGSTON RD (HWY No.2)
I
I
I
I (")
I :I:
C
I ;n
2
TOWN I
I
OF I ~
PICKERING I
I
I
I
~ I
I
I
I
I
I
I HWY. No. 401
I
I
I
I
I
I
I
I
I
~ the metropolitan toronto and regIon FIGURE 1
, conservation authority
-
J }'
r,:) (/ ,'" \
.
.'
, \
\
.
\ J
\ ~" - .,
\ .
/",/-\
I' ""
<;
V~ .
\ \ .
.
\
\
,us
,
.010
0
~
~
. \ ,'"'-. ,~
'. I) \
~ . '
~ the metropolitan toronto and region LOCATION OF STUDY AREA FIGURE Z Ol
conservation authority I
IJ\
~
tP
I
1J1
j ) t \\ 1J1
\ I\-
"'0 ~/./ I\.
\\
\ \ " . ' \\
r ,r ' "-.:\ -,-~
\
.
\ \
\ '"
'. .
/' -/""... \
<- I'",
\ <:
v--\ .
, , .
.
\
\
\
, \
\
10' 0
0
~
.
.
,
~ .
~ AREAS SUSCEPTIBLE TO fLOODING 11)O 'tEAR fLOOO -'- fiGURE 3
the metropolitan toronto and region BELOW MoT.R.C.A MINIMUM CRITERIA
, conservation authority
- -
} )' . ..
I ..
":) ~/,/ \\
\ " . 'II
i \ ' \\
" "-:."..--..J
\ \\
. 'II
\ ~
, r.. "
\ .
.../"- .
,/ ,
\ ~ ,,~
<<
~ .
\ '. .
.
\
\
I
...
, \
1010
.,
~
~ .
. C" "
. . ')'
. I
. '
.....Ioe metrOPOlllan loronlO and region AREAS SUSCEPTIBLE TO FLOODING . 500 '(EAR fLOOD
BELOW M.T.R.C A. MINIMUM CRITERIA LINE ....... fiGURE 4
f/ conservation aUlhOrity Ol
1
VI
Q'\
-.
8-57
- 3 -
TABLE 1
PICKERING/AJAX DAMAGE CENTRES
SUMMARY TABLE
Risk of
Flooding
Return over 100 Commer- Resi- Depth of
Period year life cial dential Total Flooding Damage $ Value $
Annually 100% 2 7 9 0-0 3m 10,515 -
25 yr 98% 3 9 12 0-0 3m 70,300 -
100 yr 63% 5 17 22 0-0 8m 165,000 -
150 yr 49% 5 18 23 0-1 Om 206,700 1,217,000
350 yr 25% 5 25 30 0-1 5m 396,500 1,512,000
500 yr 18% 5 27 32 0-1 5m 420,825 1,607,000
Regional - 37 71 108 0-4 Om 10,581,700 22,760,000
The damages estimated in Table 1 represent only the tangible losses and do not
include such intangibles as lost revenues, human suffering and inconvenience,
loss of life, etc The "Value" figure represents an estimated net worth of the
properties affected
Based on this information, the present value of the average annual damages was
determined to be $175,000 utilizing a 6% discount rate Again this represents
only the pr~sent worth of the tangible costs
The most economically viable and environmentally acceptable solution to
achieving the minimum level of protection is the construction of 2 dykes located
as shown on Figure 5 Due to the wide flat overbanks described earlier there is
a relatively small difference between the 1 150 year flood event and the 1 500
flood As a result, the additional cost for providing the 500 year protection
is very small The estimated additional cost is estimated to be only $25,000
and therefore, the alternative of providing 500 year protection is recommended
The total estimated cost for the recommended alternative is $350,000 Although
this cost compared to the present value of the damages gives a cost/benefit
ratio of 0 5, it is expected that if the intangible benefits were able to be
costed that a more favourable cost/benefit ratio could be obtained A summary
of the intangible costs is provided below
~ /-
\ .
(
~
~
'"
-~\
\
\
.
..s
-
DYKE LOCATION .... t:ll
500 yEAR FLOOD LINE ........... FIGURE 5 I
U1
0:>
B-59
- 4 -
Although it is always difficult to assign dollar values to the intangible items,
it is important that they be considered Items which are included as
intangibles are the social disruption to the Pickering/Ajax communities, road
closures causing traffic disruptions and the hampering of emergency vehicular
traffic, damages to municipal services such as water supply and sewers resulting
in public health problems, evacuation of local residents and the threat to loss
of life
Since flooding of this area occurs on an almost annual basis, the intangible
costs are significant The need for the municipality to continue to pump out
basements once or twice a year plus the inconvenience to the residents
represents a considerable expense Also the lost revenues by the commercial
properties and the potential loss of future business and good will must be
considered when attempting to define the more intangible affects associated with
flooding
In this regard, the recommendation to provide 500 year flood protection to the
Pickering/Ajax Damage Centres is deemed to be appropriate and justified The
relatively small cost for remedial works which provide such a high level of
protection is certainly warranted
The components of the remedial works required to provide 500 year protection is
the same as that shown on Figure 5 The additional costs are for a slight
increase in the height of the berms The dyke proposed to provide protection to
the flood susceptible area north of Highway No 2 runs from Brock Road along the
West and Main Branches of the Duffin Creek and ties into the highway west of the
Duffin Creek Highway No 2 bridge The second dyke will provide protection to
the flood susceptible area along Church Street north of the Church Street
bridge The dyke will begin at the west side of Church Street north of the
Creek and tie into a high point of land to the north-west of the study area
The proposed dykes have been layed out along locations where the least amount of
disturbance to the existing environment would occur and also where the impact
upon private properties has been minimized The dykes were also located in
order to allow the river system to utilize the maximum amount of existing
floodplain wherever possible The internal drainage within the areas to be
protected by the dykes will be carried out through the construction of drainage
structures (culverts) with one way flow gates to ensure against backwater flow
into the protected areas
A typical cross-section4of the proposed dykes is shown on Figure 6
. .
DUFFIN CREEK
lJ:J
I
(n
0
-
~ the metropolitan toronto and region CROSS SECTION OF DYKE AND FLOOD PLAIN FIG. 6
V conservation authority
8-61
- 5 -
HISTORY OF FLOODING
Flooding of the Duffin Creek in the pickering/Ajax Damage Centres has been
recorded as early as 1886 For the period between 1886 and 1982 this area has
flooded at least 32 times The majority of the flooding occurs in the spring
time both as a result of high flows and ice jamming A chronological list of
the recorded floods for the Pickering area follows
Detailed accounts of the flooding are not available for the majority of the
flood occurrances More information however is available for the more recent
events This information indicates that flooding can last from 6 hours to 2 1/2
days On several of these occasions the municipality was required to provide
assistance to the residents in the form of basement pump outs, evacuation of
residents and culvert cleanout
Flooding in this area h~s become an almost annual event It is for this reason
plus the susceptibility to more severe flooding that the Authority rated this
area number 4 on its priority list of 14 Damage Centres requiring remedial work
The following photographs illustrate the flooding problem in this area as well
as depicting the type of development located within the Damage Centre
DUFFIN CREEK FLOOD HISTORY
PICKERING VILLAGE
The following floods have been reported
1886, March 2 - caused by spring melt
- parts of village flooded
1890, June 5 - caused by heavy rains and thunderstorms
of previous two days
- local bridges damaged
- telegraph lines down
- cellars flooded
- roads washed out, some livestock lost
1936, March 11 - caused by spring melt plus rain
- roads flooded and damaged
1942, March 9 & 17 - caused by ice jams
- roads blocked and damaged
1948, March 16 - Hwy 2 flooded 6 inches deep
1949, February 15 - roads blocked and damaged
1950, January 26, - a series of floods aggravated
March 25-26, by ice-jams
Apri 1 4
- damage to roads and houses
1951, April 12 - roads flooded
B-62
- 6 -
1951, July 16 - caused by heavy rain
- roads flooded
1952, February 4, - roads flooded
March 11
1953, February 21 - caused by ice-jam
- roads and one home flooded
1953, March 4 - Hwy 2 flooded
1954, February 15 - roads flooded
1954, February 21 - Hwy 2 flooded
October 15-16 - Local roads flooded
(Hurricane Hazel) - at least one family forced out
1955, March 1 - Hwy 2 flooded 2 feet deep at
Church Street
1956, March 7 - caused by ice-jam
- ice chunks and water on Riverside
Drive, 12 families evacuated
- Hwy 2 and nearby houses flooded
1959, April 2 - Hwy 2 flooded briefly
1959, April 8 - caused by ice-jams
- Riverside Drive, Hwy 2 flooded to
about 2 inches deep
- 2 families evacuated
1960, March 28-31 - Hwy 2 at Church Street flooded
6 inches to 1 foot deep
1960, April 2-3 - Hwy 2 flooded and closed briefly
1961, February 23 - footbridge over a tributary washed out
near Riverside Drive, one couple
temporarily stranded at a cottage
1979, December 25 - flooding north of Hwy 2
- flooding along Church Street
1980, March 21 - flooding north of Hwy 2
- flooding along Church Street
1981, February 18-21 - duration 2 1/2 days, 2 separate events
- flooding - Hwy 2 - north
- Church Street
- Fire Department (Pickering) called to help
in residence completely innundated
1982, March 31 - April 1 - flood north of Hwy 2 and by Church Street
- several residences completely innundated
- M T C out to unclog culverts
- offered to evacuate Not undertaken
8-63
, FLOOD OF MARCH 1981
t~~.
'I r'o ~
_~I ,
I I ,
; .~ ;t./ t. ~,
. :.t i -~ ~ ---
"':_&, , i, '\ .,.l:~
FLOODING OF RESIDENCE NORTH OF HWY ~2, SOUTH
OF DUFFIN CREEK IN PICKERING
.
\
'" ,
~.
, I ~
,~- .-
~~:'.L ~~~
.~~
l
FLOODING OF MOTEL NORTH OF HWY ~2, WEST OF
DUFFIN CREEK IN AJAX
8-64
- 7 -
PROPERTY REQUIREMENTS
Since the major amount of property required for this project is presently owned
by this Authority, only a small amount of additional properties will be
required These properties if required will be acquired under the Land
Acquisition Project 1982-1984 of the Watershed Plan and therefore will not form
part of this project
,
,
B-65
- 8 -
COSTS AND FINANCING
The expenditures required to implement this project shall be understood to
include engineering and geotechnical studies, site supervision, environmental
assessment and all materials, labour, equipment, etc associated with the
construction
Costs
Highway No 2 to
Activity Church Street Dyke Brock Road Dyke
Mobili~ation/Demobilization $ 3,500 $ 9,000
Cleaning & Grubbing $ 5,000 $ 9,000
Stripping & Storing Topsoil $ 2,800 $ 4,500
Importing & placing material $ 47,800 $ 68,100
Replacing Topsoil $ 6,000 $ 13,500
Seeding, Sodding & Mulching $ 7,500 $ 15,500
Restoration $ 2,000 $ 5,000
Drainage Structures $ 10,000 $ 40,500
Bonds & Insurance, Engineering, Legal,
Inflation & Contingency Allowance $ 40,400 $ 59,900
Total $125,000 $225,000
Project Total $350,000
Financing
This project will be funded as follows
1984
Province of Ontario $192,500
Authority $157,500
$350,000
The Regional Municipality of Durham is designated as the benefiting municipality
to raise the Authority's share of the cost of the work being 45% of the total
6-66
SCHEDULE "B"
~PO:RT H/83
TENDE:R OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham
Drive, Downsview, on Thursday, March 31, 1983, commencing at 2 00 p m to
open the following tenders
1 Entrance Road Paving, Colonel Samuel Bois
Smith Waterfront Area
2 Launching Ramp Parking, Humber Bay West
Waterfront Area
PRESENT WERE
Chairman Mrs F Ge11
Johnson, Sustronk Weinstein
+ Associates, Consulting Engineers H Sustronk
Staff C Mather
B Denney
N Cowey
The Committee was advised that thirteen tenders for the Colonel Samuel Bois
Smith contract and fifteen tenders for the Humber Bay West contract were
received as follows
COLONEL SAMUEL BOIS SMITH :#
- Entrance Road Paving
Contractor Amount
1 Empire Paving Ltd $53,195 20
2 Ferpac Paving inc $54,584 60
3 Maple Earthmoving (227223 Ltd ) $55,568 00
4 Dominion Paving Ltd $56,022 07
5 Sentinel Paving & Const $57,629 65
6 Warren Bitulithic Ltd $57,853 30
7 D Crupi & Sons $58,658 00
8 Gazzola Paving Ltd $61,721 45
9 Dufferin Construction $63,814 50
10 Andrew Paving $64,658 00
11 Fermar Paving Ltd $67,040 50
12 Bray Construction $72,232 50
13 Armbro Holdings Limited $78,126 04
/2
B-67
- 2 -
HUMBER BAY WEST
- Launching. Ramp pa.rking
Contractor Amount
1 Gazzola Paving Limited $100,446 00
2 Sentinel Paving & Const $101,~42 00
3 Ontario Paving Limited $102,584.50
4 Fermar Paving Limited $102,609 50
5 Empire Paving Limited $103,982 00
6 Maple Earthmoving (227223 Ltd ) $104,238 50
7 D Crupi & Sons $106,106 00
8 Dominion Paving Limited $107,980 50
9 Ferpac Paving Inc $114,762 00
10 Dufferin Construction $115,132 50
11 Pel tar Paving $116,704 00
12 Andrew Paving $120,151 50
13 Warren Bitulithic Ltd $130,845 96
14 Armbro Holdings Limited $134,404 10
15 G & G Paving & Concrete Ltd $138,465 00
IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT
The three lowest tenders received for the Colonel Samuel Bois Smith entrance
road paving and Humber Bay West 1aunening ramp parking be submitted to the
Consultants for their review and report, with recommendations to be presented
to the Executive Committee at their meeting to be held on Wednesday, April 6,
1983
Mrs F Ge11 W E Jones
Cha~rman Secretary-Treasurer
1983 04 05
NC/md
B-68
TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA - Mtg #4/83
FROM MR J C MATHER, ADMINISTRATOR - WATER RESOURCE DIVISION
RE COLONEL SAMUEL BOIS SMITH WATERFRONT PROJECT
- ENTRANCE ROAD PAVING
The Tender Opening Sub-Committee met on Thursday, March 31, 1983 at which
time the following recommendation was adopted
"IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT
The three lowest tenders received for the Colonel Samuel Bois Smith
Entrance Road Paving be submitted to the Consultants for their
review and report, with recommendations to be presented to the
Executive Committee at their meeting to be held on Wedpesday, April
6, 1983 "
Mr H Sustronk has completed his review of the three lowest tenders and
submits the following report
"A total of 13 tenders for this project were received by you on
Thursday, March 31, 1983
Based on the tender values entered by the tenderers, the three
lowest tenders were
Empire Paving Limited $53,195 20
Ferpac Paving Inc $54,584 60
227223 Earthmoving Limited $55,568 00
Our estimate for this contract was ~ $60,000 00
The three lowest tenders were checked by us for errors and
omissions in the Form of Tender No errors were found in the
tenders submitted by 227223 Earthmoving Limited and Ferpac
, Paving Inc A number of errors were found in the tender
submitted by Empire Paving Limited primarily in the extension
of unit prices (Tender Items 18, 19, 22 and 23)
As a result, the actual tender value of Empire Paving Limited
increased to $56,544 30 Thus, instead of being the lowest
tender submitted, it is actually the fourth lowest tender
received by you
Thus, the tender submitted by Ferpac Paving Inc , in the amount
of $54,584 60 is the lowest tender received by you
Ferpac Paving Inc , has been in business for seven years and
mostly works for municipalities
Based on the above, we recommend that this contract is awarded
to Ferpac Paving Inc "
RECOMMENDATIONS
IT IS RECOMMENDED THAT The tender of Ferpac Paving Inc in the amount of
$54,584 60 for the Entrance Road Paving at Colonel Samuel Bois Smith
Waterfront Park be accepted, it being the lowest tender; and
THAT the approval of the Province of Ontario be requested
1983 04 05
NClfs
B-69
TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
MTRCA - Meeting H/83
FROM MR J C MATHER, ADMINISTRATOR, WATER RESOURCE DIVISION
RE HUMBER BAY WEST WATERFRONT PROJECT
- Launching Ramp Parting. L.o.t
The Tender Opening Sub-Committee met on March 31, 1983, at which time the
following recommendation was adopted
"IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT
The three lowest tenders received for the Humber Bay West
launching ramp parking be submitted to the Consultants
for their review and report, with recommendations to be
presented to the Executive Committee at their meeting to
be held on Wednesday, April 6, 1983 "
Mr H Sustronk has completed his review of the three lowest tenders and
submits the following report
"A total of 15 tenders were received by you for this
project and opened Thursday, March 31, 1983
Based on the tender values entered by the Tenderers,
the lowest tenders were
Gazzola Paving Limited $100,446 00
Sentinel Paving & Const $101,142 00
Ontario Paving C $102,584 50
Our estimate for this contract was ~ $106,000 00
In the Form of Tender, Tender Item No 8 was listed
twice In accordance with the Information to Tenderers
the tender was in such an instance required to complete
Tender Item 8 in both instances and include for this in
their tender Both Sentinel Paving and Gazzola Paving
did this, Ontario Paving did not As a result, the
tender submitted by Ontario Paving increases to
$105,334 50, other than this no errors were found in
the three lowest tenders
The low Tenderer, Gazzola Paving Limited, has a good
reputation and we recommend that they be awarded the
contract n
RECOMMENDATIONS
IT IS RECOMMENDED THAT The tender of Gazzola Paving Limited in the
amount of $100,446 08 for the Launching Ramp Parking Lot at Humber
Bay West be accepted, it being the lowest tender;
AND THAT the approval of the Province of Ontario be requested
1983 04 05
NClmd
~
, B-70
!,
the metropolitan toronto and region- conservation authority
minutes ~J:!l)nQ"" !C\/R1
EXECUTIVE COMMITTEE 20-APRII.-1983 '5/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,-
on Wednesday, 20-Apr il-198 3.
PRESENT
Chairman Mrs. F.E. Gell
Members W.G. Barber
M.W.H. Biggar
Mrs. tr. Hancey
(E'or J..S. Scott) W.R. Herridge, Q.C.
H.C. trawrie:
S.A. Macpherson
(For E. Fulton) W. G. Mctrean
Ms-. S. Nimmo
Mrs. N. Stoner
ABSENT
Vice-Chairman E.V. Kolb
Members E. Fulton
J.S., Scott
MINUTES
Res. t75 Moved, by: H.C., Gawrie-
Seconded by: W.G. Barber
THAT the Minutes. of Meeting H/83 be- approved.
CARRIED .
CORRESPONOENCE
Mr. W.A. Mctrean, Acting General. Manager, reported receipt of the' following
correspondence:
(a) Copy of letter dated April S, 1983, from the- Minister- of NaturaL Resources
in response to resolution of Scarboroug~ Council (as reported to Executive
Committee Meeting '4/83) that the Ministry give high priority to the
Authori ty I S proposed Highland Creek channe-l improvements:. The, Minister's
reply indicated .... "While r understand the concerns of council, I think
it is- important that they' appreciate the' difficult- task in allocatincr a
limi tad amount of provincial fundin9 to an increasinq number of
Conser.vation' Authority projects-... ~.. .'.'. ..., and r can assur8' you, the--
Highland Creek Pro-ject will be given due consid'e-ratioa in. the event
addi tional funding', becomes: available. If'
(b) tretter' dated April 7, 1983, from'- thEl' lotinister of: Natura-I. Resources to the-
Chairmen of the-- Ontar io Conse-rvation Authori ties, advis-ing.- that .... "I have
received numerous- requests to clarify the-- rolEt' of my Ministry vis-a-vis
that of the Conservation' Authorities: in th'&- plan', rev.iew process.,
specifically where: it relatea'to, flood. plain' management issues'. . .. r have-
decided that in future- the Conservation Authoritie-s, where- they exist,. should
be the-< so'le' commenting: agenc.ies' on' flood,'pla,in management matters n -
....'...
Res. H6 Moved by: M.W.f{. Biggar
Seconded by: Mrs. L.- Hancey-
THAT the letter dated April. 7, 1983, received from' the Minister of Natural
Resources, having regard to the- Minister_' s decision that Conservation
Authorlties shall be, the sole commenting' agencies: on flood plain management
matters, in the plan review process-, be received;
.
B-71 -2-
AND FURTHER THAT staff be directed to refer the Minister's letter to the
Authority solicitor for comment and to report to the Executive Committee
upon receipt of the solicitor's response.
CARRIED.
(c) Letter, dated April 19, 1983, directed to the Executive Committee by
Alderman John Sewell, dealing with matters of Authority organization
It was agreed that this letter be considered in conjunction with certain
personnel matters scheduled later on the agenda.
SECTION I
ITEMS FOR CONSIDERATION
1. REPORT #1/83 - WATERFRONT ADVISORY BOARD
Res. #77 Moved by: W.G. McLean
Seconded by Mrs. N. Stoner
THAT Report #1/83 of the Waterfront Advisory Board be received;
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #1, #2, and
*3, as set forth herein, be approved;
II (a) The Ministry of Natural Resources be requested to give early
approval to an extension of the Waterfront Development Project
for 1984, involving a provincial cash flow allocation of
$1,100,000 00;
(b) The Ontario Municipal Board be requested to approve the Project,
pursuant to Section 23 of the Conservation Authorities Act;
(c) When approved, the appropriate Authority officials be authorised
to take whatever action is required in connection with the project,
including the execution of any documents.
II The Shoreline Management Project 1984-1986, as appended as Schedule "A"
of these Minutes, be adopted;
And Further That the following action be taken in connection therewith
(a) The Municipality of Metropolitan Toronto be designated as the
benefiting municipality on the basis set forth in the proj ect;
(b) The Government of the Province of Ontario be requested to approve
the project and a grant of 55% of the cost;
(c) The Ontario Municipal Board be requested to approve the project
pursuant to Section 23 of the Conservation Authorities Act;
(d) When approved, the appropriate Authority officials be authorised to
take whatever action is required in connection with the project,
including the execution of any necessary documents.
t3 The Bellamy Road Ravine Erosion Control Project, as appended as Schedule
"B" of these ~inutes, be adopted;
AND FURTHER THAT the fo'llowing action be taken in connection therewi th
(a) The Municipality of Metropolitan Toronto be designated as the
benefiting municipality on the basis set forth in the proj ect;
(b) The Government of the Province of Ontario be requested to approve.
the project and a grant of 55% of the cost;
(c) The Ontario Municipal Board be requested to approve the project
pursuant to Section 23 of the Conservation Authorities Act;
(d) When approved, the appropriate Authority officials be authorised to
take whatever action is required in connection with the project,
including the execution of any necessary documents;
-3- B-72
(e) Subject to the receipt of provincial and municipal approvals, the
staff be directed to prepare development agreements with the
agencies involved regarding the details of additional design
studies, property acquisition, tendering, construction supervision,
financial and other arrangements;
(f) No work proceed until the owners of property south of the tunnel
intake shaft have agreed to deed the land below the top of slope to
the Authority;
AND FURTHER THAT staff report back to the Waterfront Advisory Board
during 1983 if difficulties are encountered in negotiations with
property owners in connection with the Bellamy Road Ravine Erosion
Control Project;
(g) The Borough of Scarborough be requested to enact ravine protection
legislation
CARRIED
SECTION II
ITEMS FOR INFORMATION
2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res 178 Moved by M W H Biggar
Seconded by Mrs L. Hancey
THAT the applications listed herein as A(l) to A(8) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
A(l) Borough of Scarborough
To construct bank stabillization works to protect sanitary manhole
rear of 138 Stansbury Crescent (Highland Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Two drawings (plan view and cross-section) prepared by the
applicant
A(2) philmor Developments (Harwood Chase) Ltd
To re-align small watercourse east of Monarch Avenue, south
of Clements Road, Town of Ajax (Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings Al-79563 - Gl, G4, G5, and P8, up-dated February 1983
by Bunting Wardman Limited
A(3) Borough of Scarborough
To construct culvert under proposed Lawrence Avenue Extension at
access to West Rouge Pumping Station and under C N R , together
with outlet channel from culvert to Lake Ontario Shoreline
In accordance with the following documents and plans, which shall form
part of the permit
(a) Drawings 1, 2, 3, and 9, dated March 1983, prepared by Chisholm,
Fleming & Associates;
(b) Special provisions 22, 23, 24, and 25, dealing with drainage-related
works
B-73 -4-
A(4) Mr Francisco Costa
To construct retaining structures rear of #28 Hillside Avenue,
Town of Vaughan (Don River Watershed)
In accordance with the following documents and plans, which form part
of the permit
The detailed plans submitted with the application
A(5) Mr Jose Gabriel
To replace garage at rear of #36 Bonnyview Drive, and construct
cold storage room, Borough of Etobicoke (Mimico Creek Watershed)
In accordance with the following documents and plans, which form part
of the permit
The plot plan and sections submitted with the application.
A(6) Red Cedar Investments Ltd
To place fill within regulated area and alter existing channel of
a watercourse, north of Woodbridge Avenue, west of Clarence Street,
village of Woodbridge (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Grading and Storm Sewer Outfall Drawings Nos 2, 3, and 7, Project
230-E-80, prepared by Anton Kikas Ltd and dated November 1982
A(7) Mr E Weidner
To construct gabion retaining wall and re-shape rear slope at
#165 Verobeach Blvd , City of North York (Humber River Watershed)
In accordance with the following documents and plans, which form part of
the permit
The plans prepared by ~iggins Consulting Engineers and Planners,
dated March 24, 1983
A(8) Brampton Brick Limited
To alter section of the Etobicoke Creek, east of Main Street,
south of Highway #7, City of Brampton
In accordance with the following documents and plans, which shall form
part of the permit
The "Design Report for Turbidity Reduction System", dated April 1983,
and the site plan dated AprilS, 1983, prepared by R J Long,
Consulting Limited
3 Land Acquisition Project 1982-1984 Humber River Watershed
-Property Gordon & Beryl Goodfellow
North side Mill Street, Bolton
Res t79 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the report (April 8, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED.
"Re Project Land Acquisition Project 1982-1984 _ Flood
Plain & Conservation Land Component
Humber River watershed
B-74
-5-
Authori ty Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property North side Mill Street, Bolton
Owner Gordon & Beryl Goodfellow
Area to be acquired a) o 030 acres, more or less - purchase
b) o 015 acres more or less - permanent
easement
c) o 030 acres, more or less - temporary
easement
Recommended purchase price $9,000.00, plus vendors' legal costs and
construction of suitable fencing.
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residential property,
being Part of Lots 37 and 'C' , Gardhouse Estate, Plan BOL-9, Town of Caledon
formerly Village of Bolton (The Regional Municipality of Peel) This land
is required for the Bolton channelization works This transaction also
includes the acquisition of a permanent easement for maintenance of the
flood control works, and a temporary easement for a period of approximately
eight months to facilitate construction.
"The residence situate on this property is extremely close to the work area
Negotiations have been conducted with the owners and their solici tor, Mrs
Jean Carberry, 4 Queen Street North, Bolton, Ontario, and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
The purchase price is to be the sum of $9,000 00, plus vendors'
legal costs and the construction of suitable fencing The
purchase also includes payment in full for the permanent and
temporary easements, and any disturbance resulting from the
construction
"I recommend approval of this purchase, and that the legal fi rm 0 f
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401 "
4 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property Elsa Goodfellow
North side King Street, Bolton
Res #80 Moved by Mrs L Hancey
Seconded by M W.H Biggar
THAT the report (April 8, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the pu'rchase
CARRIED
"Re Project Land Acquisition project 1982-1984 Flood
Plain & Conservation Land Component -
Humber River Watershed
Authority Executive Resolution #88, Meeting #4 -
April 8 , 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property North side King Street, Bolton
Owner Elsa Goodfellow
B-75
-6-
Area to me acquired a) 0 07 acres, more or less - purchase
b) 0 01 acres, more or less - permanent
easement
c) 0 02 acres, more or less - temporary
easement
Recommended purchase price $5,000 00, plus vendor's legal costs
and the construction of suitable fencing
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residential property,
being Part of Lots 39 and 'C', Gardhouse Estate, Plan BOL-9, Town of
Caledon, formerly Village of Bolton (The Regional Municipality of Peel)
This land is required for the Bolton channelization works This transaction
also includes the acquisition of a permanent easement for maintenance of the
flood control works, and a temporary easement for a period of approximately
eight months to facilitate construction
"Negotiations have been conducted with the owner and her sOlicitor, Mr
A.D McFall, 200 University Avenue, Toronto, Ontar~o, and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
The purchase price is to be the sum of $5,000 00, plus vendor's
legal costs and the construction of suitable fencing The
purchase also includes payment in full for the permanent land,
and temporary easements, and any disturbance resulting from the
construction
"I recommend approval of this purchase and that the legal firm Gardiner,
Roberts be instructed to complete the purchase All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid The Authority is to receive conveyance of
the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition in Account 0-04-11-401 "
5 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property Myron & Emily Blozowski
South of Rowntree Mill Road, west of Islington
Avenue, City of North York
Res #81 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the report (April 13, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
"Re Project Land Acquisition Project 1982-1984 Flood
Plain and Conservation Land Component _
Humber River Watershed
Authority Executive Resolution #88, Meeting #4 _
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property South of Rowntree Mill Road
Owners Myron & Emily Blozowski
Area to be acquired 0 680 acres, more or less
,
Recommended purchase price Nominal consideration of $1 00, plus
vendors' legal costs
"Included in the requirements for the above-noted project is a
rectangularly-shaped parcel of land, being a partial taking of a larger
property, located south of Rowntree Mill Road, west of Islington Avenue
"Negotiations have been conducted with the owner, and, subject to the
approval of your Committee, agreement has been reached with respect to a
-7- B-76
purchase price, as follows
The purchase price is to be the nominal consideration of $1 00,
plus vendors' legal costs, with date of completing the trans-
action to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm
Gardiner, Roberts be instructed to complete the purchase. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements, are to be paid The Authority is to
receive conveyance of the land required free from encumbrance
"An application has been made to the Ministry of Natural Resources for
an Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-11-401."
6. THE REGIONAL MUNICIPALITY OF DURHAM
-Request for Authority-owned land Bayly Street, between Valley
Road and Church Street, Ajax
(Duffin Creek)
Res #82 Moved by Mrs. L Hancey
Seconded by M W H. Biggar
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from The Regional Municipality of Durham to convey
a small parcel of Authority-owned land required to facilitate the widen-
ing of Bayly Road;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with The
Regional Municipality of Durham in this instance;
THAT a parcel of Authority-owned land, containing 0 244 acres, more or
less, be conveyed to The Regional Municipality of Durham for the widening
of Bayly Street between Valley Road and Church Street; said land being
Part Lot 13, Range 3, Broken Front Concession, Town of Ajax (The Regional
Municipality of Durham), designated as Parts 1 and 2 on Plan 40R-7426
Consideration to be the nominal sum of $2..00, with the Region being res-
ponsible for all legal, survey, and other costs;
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act, R.S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and execution of any
documents. CARRIED
7. 1983 AIR PHOTO (STEREO PAIRS) PROGRAMME
Res #83 Moved by Mrs. L Hancey
Seconded by H C Lawrie
THAT the firm of Kenting Earth Sciences Limited be retained to carry out
aerial photography for the Authority's area of jurisdiction, at a cost not
to exceed $18,400.00, plus appropriate Federal and Provincial sales taxes;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto.
CARRIED.
8 KEATING CHANNEL ENVIRONMENTAL ASSESSMENT
Res #84 Moved by: M.W.H. Biggar
Seconded by H.C. Lawrie
THAT the staff report, together with the Keating Channel Environmental
Assessment report dated March 1983, as prepared by Acres Consulting Services
Limi ted, be received;
THAT the Keating Channel Environmental Assessment report dated March 1983 be
approved, subject to the provisions of The Environmental Assessment Act;
AND FURTHER THAT the following action be taken
B-77 -8-
(a) the Assessment be submitted to the Ministry of Natural Resources
and The Municipality of Metropolitan Toronto for approval, subject
to the provisions of The Environmental Assessment Act;
(b) subject to the receipt of the conditional approvals noted in (a)
above, that the Keating Channel Environmental Assessment be sub-
mitted to the Minister of the Environment for approval under the
Environmental Assessment Act;
CARRIED
The Chairman expressed sincere appreciation to Dr Ian Hill, Senior Scientific
Specialist with Acres Consulting Services Limited in Niagara Falls and Project
Manager for the Keating Channel Environmental Assessment, for the exceptional
efforts of the many staff members involved in the production of their excellent
report
9. REPORT H/83 - WATERFRONT ADVISORY BOARD
Res #85 Moved by: W.G. McLean
Seconded by Mrs. N Stoner
THAT Report tl/83 of the Waterfront Advisory Board be received;
AND FURTHER THAT Recommendation 14, as contained therein and set forth
herein, be adopted
!! The Terms of Reference for the Aquatic Park Planning Task Force be
approved, subject to the comments of the Task Force
CARRIED.
10 KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme progr amme
Wind Energy Monitoring System
The following quotations have been received for the above-noted equipment
Pate Instruments $1,720.00
Aeolian Kinetics 2,105.00
Second Wind Inc 2,156.00
Natural Power Inc. 2,310 00.
Res. t86 Moved by Mrs. L Hancey
Seconded by Mrs. N. Stoner
THAT the quotation received from Pate Instruments for wind energy
monitoring equipment for the Kortright Centre for Conservation Renewable
Energy Theme programme, in the amount of $1,720 00 (plus P.S.T. and F S. T ),
be accepted, it being the lowest quotation received.
CARRIED
11 BICENTENNIAL PROJECT
Res. t87 Moved by M W H. Biggar
Seconded by: Mrs. L. Hancey
THAT the Authority designate the Black Creek Pioneer Village Visitor Centre
as its contribution to the Bicentennial of the province of Ontario in 1984
CARRIED.
12 REPORT H/83 - R.D.H P ADVISORY BOARD
Res. t88 Moved by Mrs. N. Stoner
Seconded by H.C Lawrie
THAT Report tl/83 of the R D.H P Advisory Board be received;
AND FURTHER THAT the recommendations contained therein, and set forth
herein, be approved
n Until such time as matters dealing with re-organization are
considered, the name "Carruthers Creek" be added to the name
of the Board and that it be referred to as the- R.D.H P.C.
Advisory Board.
-9- B-78
.E The Executive Committee authorise the staff to poll community
interest groups within the R 0 H.P C watersheds to determine
their interest in receiving agendas and meeting information for
this Board, and in being involved in its activities.
CARRIED
13 FINANCIAL REPORT AND ACCOUNTS FOR THE
PERIOD JANUARY I-MARCH 31, 1983
Res #89 Moved by Mrs. L. Hancey
Seconded by Mrs N. Stoner
THAT the Divisional Expenditure Summary for the period January 1, 1983, to
March 31, 1983, as appended as Schedule "C" of these Minutes, be received;
AND FURTHER THAT payment of the Authority accounts, in the amount of
$3,132,706 00, be approved.
CARRIED.
14. REPORT #1/83 - RECOGNITION SUB-COMMITTEE
Res #90 Moved by Mrs. L. Hancey
Seconded by S A. Macpherson
THAT Report #1/83 of the Recognition Sub-Committee be received;
AND FURTHER THAT the recommendations contained therein, and set forth
herein, be approved
!!. the 1983 Honour Roll Awards tree planting ceremony be held on
Friday, May 13, 1983, at 1 30 p.m. at the Authority's
Administrative Headquarters, and that the following persons
receive Honour Roll Awards consisting of the planting of a
tree suitably marked with a plaque
Elgin H.. Card
G. Hadden Gillespie
Fred Kline (deceased)
Reg Twi sel ton
Earl Whitewood
.E the Runnymede Collegiate Institute Stage Band be invited to
participate and to perform before the ceremony;
!l a lunch be provided for Honour Roll Award recipients, Authority
members, and their guests, prior to the ceremony, with light
refreshments (coffee, tea, cold drinks, and cookies) being
served immediately following the tree planting ceremony;
!! the Annual Garden Party be held on Wednesday, June 29, 1983, at
12 30 P m at Black Creek Pioneer Village Gold Service
Recognition Awards will be presented to P B Flood, J Honingh,
M. MacDowell, R. McMullin, and L. Maltby at the Garden Party.
These staff members will also receive recnogition at the Staff
Christmas Party Lifetime Passes will be presented to
E T. Jackson and M.O P. Morrison, Foundation Members. Silver
Recognition Awards and Lifetime Passes for staff will be presented
at the Staff Christmas Party;
!i the staff be directed to up-date the Recognition Policy with
respect to the recognition of full-time staff of the Authority
on retirement, and as to the suitability of the value of the
gift in light of inflation.
15. MARKETING PLAN SUB-COMMITTEE
Res. #91 Moved by W.G McLean
Seconded by M.W.H. Biggar
THAT the Vice-Chairmen of the Information & Education, Historical Sites,
and the Conservation Land Management Advisory Boards, together with any
other interested board members, be appointed to the Marketing Plan Sub-
Committee
CARRIED.
B-79 -10-
16 Res #92 Moved by Mrs L. Hancey
Seconded by S.A Macpherson
THAT certain personnel matters be discussed in camera.
CARRIED
17. Res #93 Moved by Mrs. L Hancey
Seconded by M.W.H. Biggar
THAT Mr K.G. Higgs be assigned to a position in which he is responsible
for the overall development, co-ordination, and oPeration of the
Conservation Land Management, Information and Education, and Historical
Sites Divisions; the position to be established at an SM5C level at a
salary of $51,633.00, effective date May-2-1983;
THAT the Authority purchase, for the credit of Mr. Higgs, 75% (seventy-
five per cent) of his past service credits with the ontario Municipal
Employee Retirement System in the approximate amount of $41,000.00;
AND FURTHER THAT funds for same be made available from the ~983 Budget.
CARRIED
Res. #94 Moved by Mrs. L. Hancey
Seconded by W.G. Barber
THAT the matters of administration re-organization and appointment of
General Manager be deferred for consideration at the next regular meeting
of the Executive Committee.
CARRIED
17 TERMINATION
On motion, the meeting terminated at 12 30 p.m., April 6.
Florence Gell W E. Jones
Chairman Secretary-Treasurer
KC.
B-80
SCHEDULE "A'~
SHORELINE MANAGEMENT PROJECT
1984 - 1986
APRIL 1, 1983
B-81
CONTENTS OF BRIEF
PAGE
PURPOSE 1
BACKGROUND AND POLICIES 2
LOCATION AND DESCRIPTION 3
1984 - 1986 PROGRAM 6
COSTS AND FINANCING 8
APPROVALS 9
- 1 - B-82
PROJECT FOR SHORELINE MANAGEMENT
1984 - 1986
PURPOSE
The purpose of this Project is to permit The Metropolitan Toronto and Region
Conservation Authority to exercise the powers afforded by The Conservation
Authorities Act, R S 0 1970, Chapter 78, as amended, to establish and undertake,
in the area over which it has jurisdiction, a program designed to further the
conservation, restoration, development and management of the natural resources of
the waterfront in accordance with the Shoreline Management Program of the
Watershed Plan. The Project covers the three-year period 1984 - 1986
The goal of the Authority through this Project is to
"undertake a comprehensive program of shoreline
management designed to prevent, eliminate, or
reduce the risk of hazard to life and property,
while cognizant of the natural attributes of the
lake front setting "
B-83
- 2 -
BACKGROUND
The Authority has been responsible for the implementation of the Waterfront Plan
for the Metropolitan Toronto region since 1970 Shoreline management measures
were a component of that responsibility and were addressed in the two Five Year
Projects, 1972-1976 and 1977-1981 Shoreline management works were undertaken in
each municipality along the waterfront involving total expenditures of
approximately $2,200,000 An additional $900,000 has been spent under the
1982-1983 Shoreline Management Project
The importance of shoreline management measures has steadily increased as
residential areas in particular are becoming increasingly threatened by shoreline
erosion. The Authority decided in 1980 to prepare a separate program for
Shoreline Management within the Watershed Plan in an effort to raise ilie level of
awareness of the problem and secure stronger support for solutions
The shoreline management measures employed to date can be classified into two
components prevention and protection Efforts have been made to ensure that
new developments are cognizant of the hazards of shoreline erosion and flooding
Adequate setbacks and/or suitable shoreline protection have been employed to
provide for maximum feasible protection of new developments The protection of
lives and property in previously developed areas has been pursued by a
combination of protection and/or acquisition Shoreline protective works have
been installed in some instances to reduce erosion rates and increase the useful
life of structures In other instances it has proven to be most economical to
acquire endangered properties and allow natural erosion processes to proceed It
may also be necessary to acquire properties since the erosion problem is too
severe to be solved through protective works
POLICIES
The policies and operational criteria of the Authority governing shoreline works
are enunicated in detail in the Shoreline Management Program of the Watershed
Plan.
- 3 - B-84
LOCATION AND DESCRIPTION
The following is a sector by sector analysis of the proposed shoreline management
measures to be implemented by the Authority The sector locations are shown on
Fig 1 It should be noted that the areas detailed below are to be considered as
a pool of priority sites which the Authority maintains and reviews on an annual
basis Erosion is very dynamic in nature and as such. the Authority must be able
to react as site conditions change It is for this reason that all waterfront
sectors are included in the project At this point in time the most hazardous
sites are located in the Scarborough sector and as such a more detailed list is
provided The elements of the Authority's Shoreline Management Program related
to prevention of development in hazardous locations are common to all sectors and
are not reiterated here
Borough of Etobicoke
The extent of residential development combined with the physical characteristics
of the shoreline have resulted in extensive successful efforts by individual
property owners to protect the shoreline on a lot by lot basis Few serious
erosion or flooding hazards exist in the Borough and the Authority's role has,
therefore. primarily centred on protection of publicly owned land such as small
parks This role is expected to continue. although specific sites have not been
identified at this time
Privately owned lands are also eligible for shoreline protection by the Authority
provided that the operational criteria established in the Shoreline Management
Program can be met This Project also includes shoreline maintenance of
structures constructed as part of the Lake Ontario Waterfront Development
Program.
City of Toronto
It is proposed that shoreline management works be undertaken at Gibraltar Point
on Toronto Island. The proposed works are expected to include a shoreline
revetment, groynes and beach nourishment
Borough of Scarborough
The most serious hazards resulting from shoreline erosion in the Authority's area
of jurisdiction are located in the Borough of Scarborough Numerous locations
have been identified where serious hazards either already exist or are
developing As indicated earlier. the following is the list of sites requiring
early attention In all cases under existing conditions these sites are more
critical than any in the other sectors This however cou ld change with water
levels and number and severity of storms
8-85 - 4 -
Lakehurst Crescent
Fallingbrook Drive
South Marine Drive
Guildwood Parkway
Crescentwood Road
Kingsbury Crescent
Springbank Avenue
Wynnview Court
Fishleigh Drive
Pickering/Ajax
Shoreline hazards in this sector have been minimized by the Authority through
acquisition of substantial sections of the shoreline prior to development
Erosion of these valuable public areas is proceeding and may require measures
from time to time to reduce the rate of loss There are no specific sites
identified for work at present although numerous sites are proposed for
monitoring to determine erosion rates
Implementation Criteria
The following criteria will be followed by the Authority in the design and
construction of erosion control works
(a) The major emphasis in the undertaking of protective works will be to
control erosion due to wave action The required works will be designed
in consideration of maximum expected lake levels as well as peak storm
conditions;
(b) Consideration will be given to bank stabilization techniques to be
combined with toe protection in areas where additional protection is
required to retain slopes at steeper than natural angles;
(c) Shore protection will be carried out on a design block basis Design
blocks are shoreline segments with physical characteristics which permit
the segment to be protected as a unit The characteristics to be
considered include shoreline configuration, construction access, bank
condition, talus formations and wave energy Climate, among others;
(d) Shoreline protection will be installed on a technical priority basis
related to the safety of property and structures within the limitations
of funding, approvals, construction access and property acquisition
Priorities shall be based on technical criteria including, but not
necessarily limited, to the following
- distance from top of bank to structure
- rate of slope retreat
- extent of groundwater seepage
....
(
--.
1 j~~:.? if' I :
J , . .' , i. - ~.' ~ J'
. i _ 1 " r:~."~".'; ~ I ,;
-. " __'__, >:[, \ ' < ;. J I - ' -.
/' ---- ,) .... l..... I' .--.
f ,,' r I i \ . \' iI' :
-f ...~... .J. - -'.t.t.- ..... I -__ /.......... .
! - --;, ... "I";} J-' ~ . .... -.....,. - :
#/ /', _ / ~(-- f -l&!1! ::0;.'+11 !L:;;:'--~- J~ ,to i (T \ ~, !
~ 1 . j ! .J) :fl[rl~!Jfl!:ffl~ ~.. \ :
t~ I I tf /i.J~r71J.J!fjlf:j" ') ( ; ,........... OAT '" - .
'. -? ,,~ ;<["'1. f,]' ~ ~ ""- &lALD INN LDWVlIW)ul;(: 40.. II '\ :
l ~: ,: - ~:" -::;)""".." .. ~. ... .. .. ""::.TOfR<OI<Tf
,. '-'~-'JJf!:3:r<; :u .. lAST ..o.R ~ q.. .
. I .. .. : Ptc"
~ ~ SUI"" . "f:R .
. ......"........ "'.. i lNG/AJAX SECTOR-----7
: .,.. Q. .
. EC10l" .
: s : :
:~SCARBOROUG" :
: SHORELINE MANAGEMENT PROGRAM-SECTOR LOCATION FIG. I
{Jl
I
co
en
B-87 - 5 -
- height and steepness of slope
- soil composition
- vegetative cover, type and extent
- evidence of previous movement
- condition of toe of slope;
(e) priorities for protection will be reviewed and approved by the Authority
on an annual basis;
(f) Existing waterfront public lands provide valuable recreational
opportunities and, in many cases, serve as buffer zones between the
shoreline and private lands Therefore, the balance between funding
allocated for protection of public and private lands is an important
relationship which should be approved annually by the Authority;
(g) In cases where private property is involved, the Authority shall require
title to the land for a nominal sum or an easement where applicable, and
in addition may require a suitable financial contribution from the
benefiting owner(s);
(h) The Authority will assist in developing technology and distributing
information which will aid property owners in limiting the erosion of
the bank after the toe protection is installed
- 6 - B-88
1984 - 1986 PROGRAM
As indicated. the selection of sites for remedial work is done on a priority
rating basis The continual monitoring of the sites contained in the pool of
sites. particularly in the Scarborough Sector. enables the Authority to carry out
remedial works where the greatest need has been demonstrated
Based on the information to date. the proposed three year program will
concentrate on the South Marine Drive area in Scarborough along with the
completion of works at Lakehurst Crescent in 1984 It is anticipated that the
time to complete the works at South Marine Drive will exceed the duration of this
Project As a result, extensions to this Project will be required to continue at
South Marine Drive and to deal with the other sites on the priority list
A major component of the Authority's approach to shoreline management, as -
indicated, is acquisition. This allows the Authority the ability to acquire
properties which are in hazardous situations as a result of shore and bluff
erosion and where remedial measures cannot be justified, from an economic basis
Any property acquisition will be done in accordance with the Authority's Land
Acquisition Program. Funding for waterfront hazard lands. however. will be
raised as part of this Project
In order for the Authority to carry out remedial works. appropriate engineering
and soils studies are a necessity Environmental concerns must al so be addressed
as part of any design and construction program. Funding is therefore required to
carry out preliminary engineering designs, environmental inventories.
geotechnical studies and slope monitoring studies
Minor remedial works have also proven to be very effecti ve in reducing bl uff or
toe erosion Through this component of the program the Authority can provide a
"stitch in time" approach to many areas with the result that expensive remedial
works may not be required in the future Such approaches as vegetation
establishment. bluff drainage or beach nourishment have proven to be very
successful and it is intended to continue to use this approach Funding for the
three aspects of shoreline management is proposed on an annual basis as follows
Major Remedial Works $ 575.000
Minor Remedial Works $ 15.000
Surveys and Studies $ 20.000
Acquisition $ 120.000
$ 730.000
The selection of sites for the annual work program will be finalized as part of
the annual budget preparation However. as indicated. work will be concentrated
at Lakehurst Crescent and South Marine Drive over the next three years Details
of these two sites following below and are illustrated by photos 1 and 2
B-89 - 7 -
Lakehurst Crescent
The shoreline protection works at this site will be finalized as part of the 1984
work program. This work when completed will have provided protection to eight
homes
The protection will consist of bluff toe protection only Phase II of the works
estimated at $200,000 00 will complete this site
Bluff Height - SSm.
Length of Shoreline - 400m.
Potential Loss - 8 homes or $1,200,000
Total Cost - $450,000
Projected 1984 Cost - $200,000
South Marine Drive
The first phase of protection works for this section is proposed for 1983 Again
this section of shoreline is located in the Scarborough Bluff area
Protective works are required to prevent the loss of 28 houses, a townhouse
complex, and an apartment tower Very high rates of erosion are being
experienced in this area with land being lost at 1 4 to 28m/year
The value to be placed on the affected properties is very difficult to assess
The relatively low cost of protective measures and the high degree of hazard more
than justify remedial works The 1984 program will protect 200 m of shoreline at
an estimated cost of $375,000 00 The total estimated cost is $4 4 million
Problem - Bluff erosion due to wave action
Height of Bluff - 50m.
Length of Shoreline - 105 Om.
- 200m. proposed for protection in 1983
Erosion Rate - 14- 2 8 m/yr
Effects - Potential loss of 28 private homes, a
townhouse complex and an apartment tower
Cost - $375,000 00 for Phase I in 1984
As indicated earlier, work will not be completed at this site by the end of the
Project A subsequent Project will be developed however, prior to the end of
1986 to continue with the Authority's Shoreline Management Program.
- 8 - B-90
COSTS AND FINANCING
Costs
Implementation of the Shoreline Management Project 1984 - 1986 is estimated to
require expenditures of $730.000 in each year for a total estimated cost of
$2,190,000 The costs of the Project include legal and survey fees, land
acquisition, engineering and geotechnical studies. site supervision and all
materials. labour, equipment etc associated with the construction
Financing
It is proposed that the funds required for this Project be raised on the basis of
55% grant from the Province of Ontario and 45% from The Municipality of
Metropolitan Toronto as benefiting municipality Annual funding requirements are
therefore as follows
-
Province of Ontario $ 401,500
Municipality of Metropolitan Toronto $ 328,500
TOTAL $ 730,000
Total Funding for 1984 - 1986
Province of Ontario $1.204,500
Municipality of Metropolitan Toronto $ 985.500
TOTAL $2,190.000
8-91
SCHEDULE "B"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
BELLAMY ROAD RAVINE EROSION CONTROL PROJECT
APRIL, 1983
B-92
CONTENTS
PAGE
INTRODUCTION 1
BACKGROUND 2
Design Objectivea 2
. Alternative Solutions 3
Recommended Solution 3
PROJECT TIMING 4
COST ESTIMATES 5
.
B-93 - 1 -
BELLAMYROl\D RAVINE EROSTON CONTROL PROJECT
INTRODUCTION
This Project was developed by the Metropolitan Toronto and Region Conservation
Authority to propose erosion control measures in Bellamy Road Ravine in the
Borough of Scarborough The Project summarizes the nature of the problems,
highlights the possible solutions, presents a construction program and
suggests a shared funding arrangement
Bellamy Road Ravine is a steep valley cut into the land between Kingston Road .
and the Lake Ontario shoreline approximately mid-way between McCowan Road and
Markham Road It has an overall length of approximately 1,050 m along which
the bottom elevation drops about 96 m (Fig 1)
Thirty-five homes are located around the perimeter of the ravine on lots
which extend into the ravine in most cases As a result, most of the lands
affected by erosion are privately owned with the exception of a road
allowance which extends from Ravine Drive through the bottom of the ravine
to the lake
The ravine was probably originally formed by a watercourse creating a small
gully when it flowed over the edge of the bluff to the lake As erosion
continued in the soft material of the bluff the gully grew deeper and wider
Erosion of the side walls of the ravine was accelerated by groundwater
emergence at several points Over many centuries the side slopes of the
ravine reached angles that would allow vegetation to be more or less
permanently established and the ravine may have been entirely vegetated prior
to the time when the surrounding land was first cleared for agricultural
purposes As the watershed of the stream was developed for agricultural and
eventually residential uses the frequency of flows and the volume of water
carried by the stream increased substantially The bottom of the ravine eroded
downwards causing instability in the side slopes and leading to gradual loss
of vegetation and eventually loss of table land around the ravine (see photos)
The invert of the ravine continues to deepen at this time and most of the
vegetation has been lost from the slopes in the lower part of the ravine
Table land is being lost at an alarming rate in the southern parts of the
ravine and similar losses will become evident in the central and northerly
portions if the instability in the lower slopes is allowed to affect the
upper slopes
B-94
PROJECT FOR EROSION CONTROL
ON THE BELLAMY RD. RAVINE
LAKE ONTARIO .,.
FIG. I
-"11"..., - -
B-95 - - r ~-..". _. ~_ ~
.. -]I , ... _-: " ,~~ _~
~ '~ : -to;!'. ,,,.~I ; i" ..~
,- A- - <0..
-.; ;.--
t~~' .- ~.
.:'
" ~ .
.;~ '.
't.. ....-'"_ .:!>,'
~\~ '\..~ - ..~ .i("
.<t.~; ..; 1t: .
.- ~ . .. ~ :... '. '.
.~~
.1Lo' __
!"
,
,
-- -.
M LAKE ONTARIO
NORTH FRO
VINE LOOKING
AD RA ,
BELLAMY RO GSTON ROAD
TOWARDS KIN
I
ro
I
BELLAMY ROAD RAVINE LOOKING SOUTH TOWARDS LAKE ONTARIO ~
m
OJ
I
1.0
-J
-1.1' ~ -44...;.;.... j -~
" -J..-4. ! :.. v.vI
I
.-l j
1
I. i
BELLAMY ROAD RAVINE LOOKING SOUTH TOWARDS LAKE ONTARIO
B-98
- 2 -
BACKGROUND
Concern about the erosion in Bellamy Road Ravine is not recently developed
The same problem was considered in discussions among the Township of
Scarborough, the Municipality of Metropolitan Toronto and the Authority in
1964 As a result, the Township of Scarborough constructed a rock filled,
timber crib drop structure to stop further retreat of the ravine towards
Kingston Road It was decided not to involve the Authority in any erosion
control works at that time
The designation of the Authority as the implementing agency for the Waterfront
Plan in 1970 resulted in renewed interest in Bellamy Ravine It was
identified as a significant potential pedestrian access link from the
residential areas at the top of the bluffs to the lakeshore Various Authority
programs prepared since that time have referred to the importance of the area
but as the erosion continued the potential for a pathway connection, prior to
implementation of major erosion control works, disappeared The 1982-1983
Shoreline Management Project identified that the Authority could be involved
in the erosion control works in the ravine in cooperation with the efforts of
the Borough of Scarborough to control the storm water
The concern of the Borough of Scarborough for the steady deterioration of the
ravine resulted in several actions The drop structure was replaced in 1981
to ensure that the upper end of the ravine was not undermined In addition,
an engineering study was commissioned in 1979 to investigate the erosion
problems and recommend remedial measures This study by Acres Consulting
Services Limited examined several alternative means of stabilizing the ravine
These alternatives are outlined later in this project
Design Objectives
There are several design objectives which should be used in the development
and evaluation of alternative remedial measures The objectives are summarized
as follows
(1) eliminate future down cutting of the ravine i e stop
the gradual deepening of the invert of the valley;
(2) stabilize the side slopes of the ravine;
( 3) protect and enhance remaining vegetative cover and
re-establish vegetation in areas where slope angles
can be flattened sufficiently to allow vegetation to
be effective;
(4) continue to protect the upper end of the ravine where
previous works have prevented rapid erosion towards
Kingston Road;
B-99
- 3 -
(5) improve wildlife habitat; and
( 6) establish a hiking trail through the ravine in the
long term
Alternative SOl.utions
The study by Acres Consulting Services Limited in 1979 examined a wide range
of approaches to control the stormwater including the following
(1) tunnel scheme - a tunnel could be used to intercept stormwater
at the location of the existing drop structure
and divert it around the perimeter of the lower portion of the
ravine and discharge it into Lake Ontario Filling of the
lower portion of the ravine and slope stabilization measures
could be undertaken after the water was diverted around the
ravine;
(2) culvert scheme - a corrugated steel pipe sewer could be
installed in the base of the ravine to
conduct stormwater from the existing drop structure to Lake
Ontario The sewer would require a number of drop structures
to negotiate the steep gradient in the ravine without
exceeding suitable flow velocities in the pipes Pipe
construction would be followed by filling in the lower portion
of the ravine and bank stabilization measures; and
(3) gabion lined channel - fill material could be placed in the
bottom of the ravine up to a level above
which stable slopes could be built A channel lined with
gab ion baskets could then be built in the upper part of the
fill to carry the stormwater flows to Lake Ontario As in
the other schemes the fill materials to be placed would have
an approximate depth of 15 metres
Recommended Solution
The Borough of Scarborough considered the alternatives available on the basis
of the design objectives as well as the construction feasibility and long term
maintenance implications Serious concerns were identified with regard to the
feasibility and safety of constructing either the culvert scheme or the gabion
channel scheme within the ravine while contending with the instability of the
valley slopes and the stormwater discharge flows which would be present on
occasion throughout the construction period In addition, the Borough felt
that maintenance costs associated with either the culvert or the channel
scheme would be considerably higher than for the tunnel scheme
On the basis of these considerations it was concluded that the tunnel
alternative combined with filling and bank stabilization measures was the best
solution Figures 2 " 3
B-IOO
K T R
UPPER SECTION /
-REMEDIAL WORKS
TUNNEl
INTAKE SHAFT
LEGEND:
......... ~~ij~T~AL CREST
~~ Vl~~e:~TIh",.bR ~zON\~lV.
.... POTe:NTIA~T ... ROM 0.
.... ASSUMING S CREST e:~EV
: I VERTlc.'i.ORlzeNTA~'
_ _ VINE BOTTO'" FROM EX.
.\ RCAe '~~OW'NCE
MAIN TUNNEL
~
II
\'
~_._-
.-150--
,r
OUTFALL AN ~ DISCHARGE TUNNEL
ENERGY D
STRUCTURD~SSIPATION Vn.f'Mlropol
1'.AR1O BEL ,"" ....""'.M '"II"" ",......."'" N'''''''''
at! 5TO~:~~N RAVINE
p.~€. FIG.2
'v
SEPT. 1982 NEL ALICiNMEN
~IT
I ~
OJ
I
f-'
0
f-'
170 170 LEGEND
rn
",\C III[AOOWCLlffE TILl..
160 160 G
TI'tOIlNCl.lFfE fOllIll"TtON-OPPER
~'~:,::F~::', '~'d ,-J. I~ '~.':J SEWINAAY TILl..
..
150 150
en Tu Tu en {:r.. .1 TI10lilNCLlfFE FORMATION LOWfR
ILl ILl
a: - :-;-.-- -;S:'---,-; .... - . < ~ -., ;--7'~~-----"'-- 0::
t- t- f'''~'~
ILl ILl $UN:HYBAOOK TILL
~ 140 ::r=~~I.~lU~~ " "~;:i~i.~;~1;0:&,'~'~~~ 140 ::l: ' . .
z :o!: W
- SCARBO"OUGH fORMATION SAND
Z Z
0 0 ~
~ 130 130 ~ SCARBOROUGH fORMATION CLAY
;; ~ " .
.q~ .j; >
ILl ILl E:J
.J :~ .J '.... - RANDOM fiLL
",
ILl ILl
120 120
"
.,o' S~
110 :.~ ".-.:4: 110
Ss '';
"
. .: :.~-:... " .f:
100 ., ..... ,', ... . ... 0' ...; .... ... . .... .. 100
SLOPE REMEDIAL WORKS
LOWER SECTION OF RAVINE
SCALE I 500
TO \. NEXT t ROAD
i M'.
m~: ~~t;A~:~~;N- ' RANDOM fiLL
I ---1==-
---------- -- ----
, LINED
I DITCH
~
- RIPRAP
PROTECTION
PLAN THE CORPORATION Of THE BOROUGH Of SCARBOROUGH I ~~I(II
FIG.3 STUDY OF EROSION CONTROL BELLAMY RAVINE
SCALE I 500
B-102
- 4 -
PROJECT TIMING
There are clearly two components to this Project The first component deals
with collecting and diverting storm runoff around the ravine while the
second deals with reducing erosion in the ravine to save or prolong the
lives of existing dwellings The first component of the work can be done
immediately but the second component involves works to be done over a longer
period
This distinction in the type of work involved and the uncertainty associated
with the estimated cost and timing of the future ravine stabilization works,
necessitates that funding for the Project be developed in two phases
Phase I would involve the construction of the sewer and dropshaft along with
erosion control works from Kingston Road to the proposed inlet structure and
along a tributary ravine that is eroding the easterly slope through Sylvan
Park There would also be some re-vegetation to attempt to stabilize
appropriate areas of the main ravine
Since the ultimate solution to the overall erosion problem is as yet unclear
Phase I would provide funding for additional geotechnical studies,
environmental inventories and assessment, preliminary engineering and public
participation The results of these additional studies will enable the
Authority to develop Phase II of the remedial works and to prepare and
process a separate Project for funding of the further remedial measures
It is proposed that funding for Phase I of the Project be raised on the basis
of a 55% grant from the Province of Ontario on a special project basis, and
45% from the Municipality of Metropolitan Toronto as benefiting municipality
Funding for Phase II would be proposed on the same basis
Phase I
Stage 1 - involving the construction of the intake shaft,
main tunnel, main dropshaft, discharge tunnel
and outfall works at Lake Ontario
Stage 2 - involving the upper section remedial works and
such further erosion control works as are
determined to be necessary including the Sylvan
Park tributary ravine Appropriate engineering
and environmental studies to determine type,
cost and timing of Phase II
FUNDING .
Total PrOV1nce Metro
Stage 1 1,450,000 797,000 653,000
Year 1 $1,450,000 $ 797,000 $ 653,000
Year 2 $3,170,000 $1,744,000 $1,426,000
Stage 2
Year 1. $ 100,000 $ 55,000 $ 45,000
Year 2 $ 300,000 $ 1.65,000 $135,.000
g~~g~g~ggg g~~2g~~ggg g~~~~~~ggg
B-103
- 5 -
COST ESTIMATES
All cost estimates presented here are derived from estimates prepared by
Acres Consulting Services Limited in the December 1979 report entitled
Study of Erosion Control, Bellamy Ravine, Scarborough, Addendum 1
The estimates for tunnel components of the work are as provided by the
Borough of Scarborough Works Department in March 1983 and are in 1983
dollars
Main Dropshaft, Discharge
Tunne 1 , Outfall works at
Lake Ontario $1,450,000
Intake Shaft, main tunnel $3,170,000
Total for all underground works $4,620,000
The costs of the erosion control works are derived from the Acres cost
estimates with 10% per year added for inflation
Upper Section Remedial
Works and Slope Restora- $400,000 00
tion
$400,000
TOTAL COST $5,020,000
----------
----------
Implementation of the first phase of the Bellamy Road Ravine Erosion Control
Project 1984-1985 is estimated to cost $5,020,000 00 as detailed above The
costs of the project include legal and survey fees, land acquisition,
engineering and geotechnical studies, site supervision and all labour,
materials, equipment, etc associated with the construction
FINANCING
It is proposed the funds required for this project be raised on the basis of
a 55% grant from the Province of Ontario and 45% from the Municipality of
Metropolitan Toronto as benefiting municipality Total funding requirements
for phase I are as follows
Province of Ontario $2,761,000
Municipality of 2,259,000
Metropolitan Toronto
$5,020,000
,
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
DIVISIONAL EXPENDITURE SUMMARY
FOR THE PERIOD JANUARY 1, 1983 TO MARCH 31, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $
Finance & Admin.(incl. Land Acq ) 3,186,465 689,643 2,496,822 21 6
Water Resource - Flood Control 2,911,389 467,354 2,444,035 16 1
Water Resource - Waterfront 2,325,000 131,437 2,193,563 5 7
Conservation Land Management 3,548,345 693,387 2,854,958 19 5
Information & Education 2,426,623 482,432 1,944,191 19 9
Historical Si tes 3,912,822 388,086 3,524,736 9 9
Vehicle & Equipment - Capital 280,730 25,519 255,211 9 1
SUB-TOTAL 18,591,374 2,877,858 15,713,516 15 5
Vehicle & Equipment - Operations 66,390
Special Projects 138,191
C O.E.D 2,123,808 -- 2,123,808 --
Food Services 833,317 50,267 783,050 6 0
Ul
()
TOTAL 21,548,499 3,132,706 18,620,374 14 5 ::c
t'l
0
===================================================================== C
L'
t'l tll
I
I-'
() 0
= ...
~
, B-I05
the metropolitan toronto and region conservation authority
minutes REPORT #6/83
EXECUTIVE COMMITTEE 4-MAY-1983 '6/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 4-May-1983.
PRESENT
Chairman Mrs. F.E. Gell
Vice-Chairman E.V. Kolb
Members W.G. Barber
E. Fulton
Mrs. L. Hancey
(For J.S. Scott) W.R. Herridge, Q.C.
H.C. Lawrie
S.A. Macpherson
Ms. S. NilIlIllo
(For M.W.H. Biggar) F.R. Perkins
Mrs'. N. Stoner
Authority Member R.J. Crowe
ABSENT
Members M.W.H. Biggar
- J.S. Scott
.
DELEGATION
.
Metropolitan Parks Department
-Black Creek Master Plan:
Finch Avenue' to Shoreham Drive
Mr I!' E. Kershaw, Manager, Planning & Development Division of the Metropolitan
Toronto Parks & property Department, made a presentation concerning the
above-noted plan. The Plan proposes a bicycle path with two attendant bridges
crossing the watercourse,. one south' of Shoreham Drive and the second south of the
Hydro corridor. The 3-metre-wide asphalt path will conform to other Metro Parks.
tracks, enabling maintenance' by the Department, and facilitating Police
surveillance. Construction of the bicycle path is' anticipated in June and the
bridges in the autumn of 1983. It is expected that all work, including
landscaping, will be completed by the end of spring 1984.
Res. #95 Moved by: Mrs. L. Hancey
Seconded by: E. Fulton
THAT the Black Creek Master Plan - Finch Avenu& to Shoreh~ Drive, be approved;
THAT the- Metropoli tan Toronto- Parks and property' Department- be advised that the
proposed park br.idges- are. subject to review and approva-l. under. the Authority'S:
regulation;
AND FURTHER THAT consideration be given to. holding a I sod. turning' ceremony to.
mark the inception of the Plan.
CARRIED.
MINUTES
Res:~ #96 Moved' by: Mrs'.. NO. Stoner
Seconded by: S.A. Macpherson ~-
THAT Resolution #93 of Executive Committee Meeting Minutes t5/83, as written, be
deleted and the following substituted therefor:
B-I06 -2-
"Res #93 Moved by Mrs N Stoner
S.econded by M W H Biggar
THAT Mr K G. Higgs be assigned to a posi don in which he is
responsible for the overall development, co-ordination, and
operation of the Conservation Land Management, Information
and Education, and Historical Sites Divisions; the position
to be established at an SM5C level at a salary of $51,633 00,
effective date May-2-1983;
THAT the Authority purchase, for the credit of Mr Higgs, 75%
(seventy-five per cent) of his past service credits with the
Ontario Municipal Employee Retirement System in the approximate
amount of $41,000 00;
AND FURTHER THAT funds for same be made available from the 1983
Budget
CARRIED
Res il94 Moved by: Mrs L. Hancey
Seconded by W G Barber
THAT the matters of administration re-organization and appoint-
ment of General Manager be deferred for consideration at the
next regular meeting of the Executive Committee
CARRIED. "
SECTION I
ITEMS FOR CONSIDERATION
1 ALBION HILLS CONSERVATION FARM.
Res. #97 Moved by H C Lawrie
Seconded by E.V Kolb
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr Dwight Matson be selected to
operate the Albion Hills Conservation Farm;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to sign an agreement between The Metropolitan Toronto and Region
Conservation Authority and Mr Dwight Matson, in form and content similar
to .the current Albion Hills Conservation Fa.rm agreement.
CARRIED
SECTION II
ITEMS F.OR INFORMATION
2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #98 Moved by Mrs. L. Hancey
Seconded by W.G Barber
THAT the applications listed herein as A(l) to A(lO) inclusive, be approved,
subject to the conditions contained in the reports.
CARRIED
A(l) Town of Vaugha.n
~ To construct 3 steel arch culverts to carry proposed urban collector
Rivermede Road over West Don River, vicinity east of Keele Street,
south of Langstaff Road (Don River Watershed)
In accordance with the following documents and plans, which shall form part
of the permit
Drawing Nos 82-116-3, Sheet 3; 82-116-4, Sheet 1; 82-116-7,
Sheets 1 to 4.
,
-3- B-I07
A(2) Marathon Realty Company Limited
To construct 2 storm sewer outfalls, east of Airport Road, north of
Derry Road, City of Brampton (Mimico Creek Watershed)
In accordance with the following documents, which shall form part of the
permi t
Drawings Nos 8146-A-5, 6, 14, 18, 19, 20, 21, 23, and 24,
prepared by Paul Theil Associates Limited, and dated
September, 1982.
A(3) City of North York
To construct storm sewer outfall in area of Riverside Drivel
Whitfield Avenue, City of North York (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing No R-96, Sheet 2 of 2, dated October 19, 1982
A(4) Mr. William M. Gerrits
To construct addition to structure, #1972 Southview Drive, Town
of Pickering (Duffin Creek Watershed)
In accordance with the drawing entitled "Proposed Sunroom Enclosure",
prepared by the applicant, which shall form part of the permi t.
A(5) Consumers' Gas Company Limited
To re-locate existing gas main across the puffin Creek at
Baylv Street, Town of Ajax
In accordance wi th the following documents and plans, 'which form part
of the l?ermit
(a) Drawing #40-0021 prepared by Consumers' Gas Company Limited and
dated January, 1983 ;
(b) A letter dated April 11, 1983 from Consumers I Gas Company Limited
to Mr D J Prince of the Authority office
A(6) Mr Daniel G Hopkins
To build house at ~1766 Finch Avenue, west of Bluebird Lane, Town
of Pickering (Duffin Creek Watershed)
In accordance with the following documents and plans, which form part
of the permit
A drainage plan, dated April 12, 1983 and l?repared by the
applicant
A(7) The Regional Municipality of Durham
To construct 3 57 metre widening of Bayly St:eet bridge and under-
take minor channel improvements adjacent to l?rol?osed piers (Duffin
Creek Watershed)
!n accordance with the following documents and plans, which shall form
part of the [?erm i t
(al Drawings #1 and P2, MTC Structures, Site 22-165, prel?ared by
Totten Sims Hubicki Associates and dated November, 1982;
(b) Detailed specifrications for Contract 383-12, Pages S-3,
5-16, and 5-17
B-108 -4-
A(8) Sagitta Developments Ltd
To construct storm sewer outfall and drainage channel to the
Duffin Creek at C N R , north of Stouffvil1e, Town of
Whitchurch-Stouffvi11e
In accordance with the following documents and plans, which form part of
the permit
(a) Project #3696-3, Drawing #45, as prepared by Project Planning
Associates Ltd and dated April 8, 1983;
(b) Project #3696-3, Drawing #213, as prepared by Project Planning
Associates Ltd and dated June, 1977
A(9) The Municipality of Metropolitan Toronto
To place fill for wideningt of Dufferin Street from Finch Avenue
south to Stanstead Drive, City of North York (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing Nos P-IOIO-24, P-I010-25, U-131-13, and U-131-14, prepared
by the Metropolitan Toronto Works Department, and dated October 1981
Consulting Limited
A(10) Kenneth & Marion Dickinson
To construct addition to residence fronting on Sylvan Crescent, Town
of Richmond Hill (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings #8236-1, 2, 4, & 5, as prepared by Aurora General
Contractors, dated April 7, 1983
3 Land Acquisition Project 1982-1984 Humber River Watershed
-Property Lothar & Jane Schlechter
#268 King Street East, Bolton
Res #99 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT the report (April 21, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
"Re Project Land Acqui~ition Project 1982-1984 _ Flood
Plain & Conservation Land Component
Humber River watershed
Authority Executive Resolution #88, Meeting #4 _
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property #268 King Street East, Bolton
Owners Lothar & Jane Schlechter
Area to be acquired a) 0 08 acres, more or less - purchase
b) 0 04 acres more or less - temporary
easement
Recommended purchase price $6,000 00, plus vendors' legal costs,
together with suitable landscaping
-5- B-109
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being a partial taking from a residential property,
being Part of ~ot 'G' , Plan BO~-7, Town of Caledon (The Reg ional
Municipality of Peel). This land is required for the Bolton channelization
works. This transaction also includes the acquisition of a temporary ease-
ment required during the period May 1st to December 31st, 1983. A
temporary road detour, to facilitate construction of the flood control
works, is included in the immediate vicinity of the vendors' residence
"Negotiations have been conducted with the owners and their solicitor,
Norman B. I:.ipson, Fogler, Rubinoff, Suite 1400, 150 York Street, Toronto,
Ontario, MsH 3Tl, and, subject to the approval of your Committee, agreement
has been reached with respect to a purchase price, as follows:
The purchase price is to be the sum of $6,000.00, plus vendors'
legal costs, together with replacement of trees, and suitable
landscaping, with date of completion of this transaction to be
as soon as possible. The price also includes payment in fu 11
for the temporary easement and any inconvenience resulting
from the construction.
"I recommend approval of th i s purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase. All reasonable
expenses incurred incidental to the closing, for land transfer tax, leg al
costs and disbursements are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has rev i ewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401, Flood Plain
I:.and Acquisition"
4 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED
-Property: City of North York
West of Denver Crescent (Sheppard Ave./~eslie Street Area)
Res. HOO Moved by Mrs N. Stoner
Seconded by S.A. Macpherson
THAT the report (April 14, 1983 ) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and ,that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
"Re Project Land Acquisition Project 1982-1984 Flood
Plain & Conservation Land Component -
Don River Watershed
Authori ty Executive Resolution #88, Meeting #4 -
Apr il 8, 1981, and Authority Resolution
jl38, Meeting #3 - May 15, 1981
Subject property West of Denver Crescent
Owner City of North York
Area to be acquired o 048 acres, more or less
Recommended purchase price Nominal consideration of $2 00
"Included in the requirements for the above-noted project is a rectangularly
shaped parcel of land, being all of Block fA', Plan 6311, City of North York
(The Municipality of Metropolitan Toronto), located west of Denver Crescent,
in the Sheppard Avenue/Leslie Street area
"Negotiations have been conducted with officials of the City of North York,
and, subject to the approval of your Committee, agreement has been reached
with respect to a 9urchase price, as follows
The purchase price is to be the nominal sum of $2 00, with date
of completing the transaction to be as soon as possible
B-110 -6-
"I recommend approval of this purchase and that the legal firm Gardiner,
Roberts be instructed to complete the purchase All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid The Authori ty is to receive conveyance of
the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition in Account 0-04-11-401 - Flood
Plain Land Acquisition "
5 CONSUMERS' GAS COMPANY LIMITED
-Request for Permanent Easement vicinity Humber Lea Road and
King Street, Bolton (Humber River Watershed)
Res. nOl Moved by Mrs N. Stoner
Seconded by S A Macpherson
WHEREAS it is necessary for an existing gas line and permanent easement in
favour of the Consumers' Gas Company Limited to be re-located to facilitate
certain flood control works in Bolton;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to grant a permanent ease-
ment to facili tate re-location of the gas line;
THAT a permanent easement, containing 0.015 acres, more or less, be granted
to the Consumers' Gas Company Limited in the Bol ton area; said land being
Part of Lot 184, Block ' I' on a Plan of the Village of Bolton referred to as
BOL-7, and Part of Lot 30 on a Plan of the Village of Bolton referred to as
BOL-9, designated as Part 1 on Plan 43R-10765 Consideration to be the
nominal sum of $2 00, with the Authority being responsible for all legal
and survey costs in connection with the transaction;
THAT said grant of easement be subject to an Order-in-Council being issued
in accordance with Section 21(c) of the Conservation Authorities Act, R S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorised and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any ,
documents
CARRIED
6 ADDENDUM TO PROJECT FOR CHANNEL IMPROVEMENTS ON
THE HUMBER RIVER, FORMER VILLAGE OF BOLTON
-Final Engineering
Res n02 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT the firm of Marshall Macklin Monaghan Ltd be retained to carry out
the detailed engineering and contract administration for Phase II of the
Humber River Channel Improvements project, former Village of Bolton, at an
estimated cost of $53,500 00
CARRIED
7 CHANNEL IMPROVEMENTS ON THE HUMBER RIVER, FORMER VILLAGE OF BOLTON
-Extra Work Order #5
Res n03 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT Extra Work Order #5 to the contract for the Humber River Channel
Improvements in the former Village of Bolton, in the amount of
$5,740 00, be approved;
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested
CARRIED
-7- B-lll
8 CLAIREVILLE CONSERVATION AREA
-Equestrian Programme
Res. n04 Moved by Mrs N Stoner
Seconded by H C Lawrie
THAT the staff be directed to develop a suitable agreement between the
Authority and the Equine Recreation Company for the operation of an
equestrian programme at Claireville Conservation Area
CARRIED.
9. KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme Hydroelectric Display Model
Res nos Moved by: Mrs N. Stoner
Seconded by Mrs L. Hancey
THAT the contract for the construction of a Hydroelectric Display Model
for the Kor~right Centre for Conservation Energy Theme be awarded to
Barber Hydra~lics Limited at a cost of $2,950.00, including Federal and
Provincial Sales Taxes
CARRIED
10 REPORT ~1/83 - MARKETING PLAN SUB-COMMITTEE
Res n06 Moved by: W G. Barber
Seconded by H.C Lawrie
THAT the Progress Report and Recommendations - Marketing Plan for the
Conservation Areas, Black Creek Pioneer Village, and the Kortright Centre
for Conservation, dated Aprrl 27, 1983, as amended and appended as Schedule
"An of these Minutes, be received and the recommendations contained therein
be approved; .
THAT the staff be directed to develop a Marketing Plan for 1984 for the
consideration of the Marketing Plan Sub-Committee and the Executive
Committee in September of 1983 ;
AND FURTHER THAT consideration be given to developing an overall monthly
Horki ng document or work plan to include the three operating divisions
CARRIED
11 STAFF FINANCIAL PROGRESS REPORT
-January l/March 31, 1983
Res H07 Moved by Mrs N Stoner
Seconded by F R perki ns
THAT the Staff Financial Progress Report for the period January l-March 31,
1983, as appended as Schedule "B" of these Minutes, be received.
CARRIED
12 MEMBERS' SALARIES AND ALLOWANCES
Res. H08 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT the staff report having regard to Ontario ~unicipal Board approval of
the following
Chairman's salary of S19,000 00 per annum
Vice-Chair~an's salary of $7,400 00 per annum
Per diem allowance of $48 00 for members
be received
CARRIED
B-1l2 -8-
13 DISPOSITION OF THE MATTER OF APPOINTMENT OF
GENERAL MANAGER AND DIVISIONAL RE-ORGANIZATION
Res H09 Moved by Mrs L Hancey
Seconded by Ms S Nimmo
THAT consideration of Agenda Item 9(4) of Executive Committee Meeting
#6/83 be deferred until such time as the Executive Committee has met with
the Chairmen of The Municipality of Metropolitan Toronto and The Regional
Municipali ties of Durham, Peel, and York
CARRIED
NEW BUSINESS
14 QUOTATION #83-5(I&E)
-Black Creek Pioneer Village
Walkaround Tabloid
The following quotations have been received for the web offset printing,
folding, and supply of 150,000 copies of the Black Creek Pioneer village
Walkaround Tabloid
web Offset Publications Limited $3,644 68
Uxbridge Printing Company Limited 3,810 78
The village Press Ltd 4,200 00
Panographics Limited 4,385 29
Johnstone/Adams Graphics Ltd 4,828 48
Res #110 Moved by Mrs N Stoner
Seconded by W G Barber
THAT the quotation of Web Offset Publications Limited for the printing,
folding, and supply of 150,000 copies of the Black Creek Pioneer Village
Walkaround Tabloid, in the quoted sum of $3,644 68, including Federal and
provincial Taxes, be accepted
CARRIED
15 JOINT TOUR - BOROUGH OF SCARBOROUGH
AND M.T R C A
Res H11 Moved by Mrs N Stoner
Seconded by Ms-< S Nimmo
THAT the staff communication be received;
AND FURTHER THAT all Authority members and appropriate staff be invited to
attend the tour
CARRIED
16 TOUR - DON VALLEY ADVISORY BOARD
The Chairman of the Don Valley Advisory Board advised the Committee that an
all-day tour of the Don River watershed is proposed to be held on a date to
be selected in June The itinerary may include the fo 11 owi ng sites
Tour to commence in Richmond Hill
German Mills Creek
Three Damage Centres
Storm Water Mmanagement projects
Keating Channel
Erosion Problems
Lunch probably at the Waterfront
Invitations will be extended to local interest groups and to interested
Authority members
Res H12 Moved by Mrs L Hancey
Seconded by t1rs N Stoner
THAT the staff be authorised to make suitable transportation and luncheon
arrangements for an all-day tour for the Don Valley Advisory Board and
other interested parties
CARRIED
-9- B-113
17. CANADA/ONTARIO EMPLOYMENT DEVELOPMENT (COED)
At the request of the Chairman, Mrs Deans presented a brief report on the
hiring of prospective workers for the above-noted programme
A progress report on COED will be presented by Mr Higgs to the next
regular meeting of the Executive Committee
18. EXECUTIVE MEETING - JUNE 15
Mr. Kolb invited the Committee to hold its June 15th meeting at his
Caledon residence Mrs. Gell accepted, with appreciation, on behalf of
the Executive.
19. SESQUICENTENNIAL CELEBRATIONS - CITY OF TORONTO
Mr. Herridge suggested that a preliminary report of the Authority's proposed
participation be prepared by September/October, 1983, and advised that he
would be prepared to do whatever he can to assist
20. TERMINATION
On motion, the meeting terminated at 12 30 p.m., May 4.
Florence Gell W E. Jones
Cha i rman Secretary-Treasurer
"
KC.
B-114
SCHEDULE llAlI
PROGRESS REPORT AND RECOMMENDATIONS --
Marketing Plan for the Conservation Areas, Black Creek Pioneer
Village and the Kortright Centre for Conservation
SUMMARY OF RECOMMENDATIONS
IT IS RECOMMENDED THAT
1 The overall marketing objectives of the Authority be
- Increase the net revenues of the Authority,
primarily from increased attendance where
possible, and through other means where
appropriate;
- Maintain or decrease, if possible, the proportion
of total operating costs that come from municipal
levies;
- Accomplish the above in a fashion consistent
with the historical development philosophy of
the Authority As well, where practical, the
pricing policy of the Authority's offering
should reflect a maximum return from users
Where appropriate, commercial activities
occurring on Authority's property should be
offered on a franchise basis to the private
sector
2 The complementary strategies be
(1) Remove the impediments to growth by improving
the quality of the facilities and services;
(2) Encourage repeat business among existing users;
,
( 3) Increase the net revenue generated from
visitors during each visit;
(4) Attract new users
3 The establishment of an adequate "Major Maintenance Reserve
Account" be investigated and be the subject of a separate report
to the Executive Committee at a later date;
4 The facilities being evaluated in the Master Planning process
for Boyd be considered for product development in other Areas:
5 The staff be directed to study ways and means of incorporating
special programs and promotions related to Toronto's
sesquicentennial and the Province's bicentennial in 1984;
6 An interdivisional program be initiated for training of staff
at all levels on hospitality and selling:
7 Discount practices be carefully monitored in 1983 to determine
their effectiveness in increasing attendance and revenues;
B-115
- 2 -
8 Telephone calls be monitored for a trial period on evenings,
weekends and holidays, to determine the long-term policy to
be adopted for the service:
9. All school children participating in Authority programs
receive an Authority promotional brochure;
10. An extensive group selling program be initiated;
11 upgrading of signage be done, whenever appropriate, to facilitate
visitor orientation:
12 The Authority become more involved in the Travel Trade Industry:
13 Continuing and increased research and monitoring data be
collected and interpreted, to provide a basis for future
marketing plan recommendations:
14 Professional assistance be obtained in developing questionnaires,
methods of sampling, sample size and analysis and interpretation
of the data;
15. Predetermined bench marks be established as an index against
which to measure changes in attendance and/or revenues and
thus the effectiveness of the Authority's Marketing Plan.
~
************************
,
TEB/mrp
1983 04 27
8-116
INDEX
Page Number
PRO Due T ~
1 QUALITY
(a) General - at Conservation Areas
- at Black Creek Pioneer Village
- at Kortright Centre for Conservation
(b) Major Maintenance 7
.
(c) Food Services 7
2 DEVELOPMENT
(a) Conservation Areas 8
(b) Black Creek Pioneer Village 9
(c) Kortright Centre for Conservation 10
3 PROGRAM 11
4 HUMAN RESOURCES 13
P R I C I N G 14
COM M U N I CAT ION S S T RAT E G Y 15
,
OBJECTIVE 16
STRATEGY 16
METHODS 16
SID1MARY OF RECOMMENDATIONS
- Immediate Action 19
- Short Term 21
TRAVEL TRADE 23
C 0 E D PROGRAM 23
TORONTO SESQUICENTENNIAL 24
RESEP,RCHJ r 0 NIT 0 P I ~ G & CON T R 0 L 26
-
B-117
TO The Chairman and Members of the Marketing Plan
Sub-Committee, M T ReA., Meeting ~1/83,
Friday, April 15, 1983
FroM T E. Barber, R. K Cooper, P. B. Flood
RE PROGRESS REPORT AND RECOMMENDATIONS --
Marketing Plan for the Conservation Areas, Black Creek
Pioneer Village and the Kortright Centre for Conservation
In 1981 The Metropolitan Toronto and Region Conservation Authority
engaged the firm Woods Gordon as marketing consultants, to
prepare a Marketing Plan for the Authority
This action was taken as a result of declining attendance,
revenues from fees and other sources not keeping pace with costs.
and increasing requirements for provincial grant and municipal
levy to sustain operations
uespite increasing municipal levy, the maintenance of the
facilities has been deteriorating at an accelerating rate
In summary, more funding is necessary to maintain the existing
facilities It may be possible that users could provide a
greater proportion of the funds required for operations and
maintenance
The fOllowing graphs serve to illustrate and bring into focus
attendance, revenues, costs and municipal levy at the
Authority's public use facilities.
- 1 -
-- ~ ATT ENDANCE
1,200 - --- -- t- --~ n K- -I- - /"\ -I- - \ OJ
300 - - 100 I
,/ ..... I-'
-1--- -----1-----,---- 1- - --1-- - I-'
- -- ,/ ~ 00
1,000-1---- -_-I - - I ,/ - 250 I ~ 80
800 - ~r; ~~ 7 ~ = - q--- 200 - II
-II' , -- -- -p --I-- I- - n_ I - -- -- I-
600 - - -- -- - 150 - "- ...-:.
- - - - -- - --- - - - - -- - f-- n _ - l- I n __ - - - -
400 - - --- -- '" 100 -- I- 20
c
- - -- >- -- - -- - I- - - I- - z
..
'"
200 - I- - I- - - - --- -- -- - -- - - - -- - - - - :> 50 - n - I- 10
c
-' %
I-
1957 1960 65 1970 75 1980 82 1960 65 1970 75 1980 82 1979 1982
CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE
REVENUES/ EXPENDITURES FOR CONSERVATION
REvENUES EXPENDITURES - - - -
500
l- n _
--- - - --
I- - -- -- - - I- - - --- - f- - -- - - -- -- -- - -- - -- -- - - ----
2000 I- - - -- -- - -- -- -- li 1,600 - I- -
I- - -- - -- -- -- -- -- -- -- 400
I u_ n - - - -- -- - - - - -- - L I- 1,400 - c- -- I
- - --- - - - - n -- - - 1- - -- --=- "-
I\) 1500 - 1-- - - - - 1,200 II
- -- - -- ,- n -- - L_ - I- ,
I -/ - I- 1,000 7 ~ - 300 1- - ----,
- -'" Co' V . I
1000 -- - .L ~ i- 890 "'-'-
n - -- I- -....
I- ~ I- 600
l- f...-': -- '" ~ ~ 200
.... ~ ~ 400 ". I
500 - .... I"- J.JI ..... z
.. ..
"'- '" '" "
g 200 :>
- - :;;.0 c
- - I- % %
0 I- 0 I-
1957 1960 65 1970 75 1980 82 1960 65 1970 75 1980 82 1979 1982
CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE
MUNICIPAL LEVY FOR CONSERVATION
1000 - - 400 130
-- - - - -- --- - -- -- -- - l- n ) - ---
--- - -- - -- --- - - -- - - -- -- - - - -- - -- - --- 7 -- - -- -- -- - -- - - - -I- -- - - -- -- -- -
- -- - -- -- -- - -- -- - - - - -- 100
/ V
,/ -f- - - . --.
....
500 - -- I - - 200 I- - 1- -- --
- -- - - -- n_ -- - _u - n -- - --- ---. J- 70
- -- -- - -- - - - - -- -- - - --- - -- - - - - -- -- -- -- -
V - .... '"
-- ~ ~ -- - -- - c
- I- - - - -- -- - - - - --- - -- V \ ~ z
L 1-:' ..
-- -- - - - -- -;,I _n - -- - - -- ---- - - .... .... - \ I- - 1 \ I g 40
",- ~ %
0 0 I-
1957 1960 65 1970 75 1980 83 1960 65 1970 75 1980 83 1979 1983
CONSERVATION AREAS BLACK CREEK PIONEER VILLAGE KORTRIGHT CENTRE
1981 DOL LARS FOR CONSERVATION
MUNICIPAL LEVY
CONSERVATION ARE AS, BLACK CREEK PIONEER VILLAGE 6 KORTRIGHT CENTRE fOR CONSERVATION
2,000,000 -,--.---r-~.---------- -- --- --~ -,----- -------
---- --- -- -- -- - --- ---- -- -- - -- ---- -- -- -- --- - -
-- -- --- --- - -- -- -- -- -- --. -- --."- - - --- -
---. - - - - - - - - -- ---- -- -- -- -- -- __no -- --
-- -~- -- -- - -- - - - -- ---- -- -. -- - - --- ---- -- - --
1,500,000 - - . --- -- -- -. - -- - - - - --- - -- -- ---
I
-- -- -- e--- ---- --- -- --"" -- -- - J
'"
---- -- ---~ - - - - - -- - -- ---- -- -- -- -- -.-- -- - -- - - -- J
I --
-- - - - -- --- - - -- -- --- -- --. - -- -- --- -".- .- - 1/
- -- --- -- _.. - - - - - -- ---- -- --- -- -- -- -- -- -
1,000,000 - --- -- - ------ -- f--- --- --- - - -- - - -- ---. --- -j I--
--- --- -.- . - .. - - - -- 1--- -- ---- ---- - - -- -" -- --- - ---- ---- ~ If
---. ---- --- - - --- -- - - -- - - -- -- -- "'
V
-- - -- - - -- - - - -- -- -- ---. - - -- -- --. -- - -- V-
- - f--- --- J ~ 1--
I--
500,000 - - 1--- -
-- -- -
- - - --- -- - --- --- -- 1---- --- -- - -- -- --- -- 7 t= ---
-- r-- t-- /
--- f' ./ -- f--- - e---- -
0
1957 1960 65 1970 75 /980 /982
CD
I
.....
.....
\D
B-120
The staff endorses the general direction of The Plan, and
the need for a more aggressive marketing approach The
overall marketing objectives are summarized as follows
- Increase the net revenues of the Authority,
primarily from increased attendance where
possible, and through other means where
appropriate;
- Maintain or decrease, if possible, the proportion
of total operating costs that come from municipal
levies;
- Accomplish the above in a fashion consistent
with the historical development philosophy of
the Authority As well, where practical, the
pricing policy of the Authority's offering
should reflect a maximum return from users
Where appropriate, commercial activities
occuring on Authority's property should be
offered on a franchise basis to the private
sector
These objectives have led the consultant to recommend four
complementary strategies
1 Remove the impediments to growth by improving
the quality of the facilities and services;
2 Encourage repeat business among existing users;
3 Increase the net revenue generated from visitors
during each visit;
4 Attract new users
The following is a summary of action taken, or planned, for 1983
with respect to recommendations on Product, Pricing, Communications
Research, Monitoring and Control
- 4 -
B-121
PRO Due T
1 QUALITY
The attractiveness of a facility is vitally important for
repeat visitation During the past five years insufficient
funds have be~n available to adequately maintain the Conser-
vation Areas, Black Creek Pioneer Village and the Kortright
Centre for Conservation. Generally, the Authority's
facilities look "run down"
Substantial improvements in maintenance were initiated in
1982 and are planned for 1983 I'
(a) General
at the Conservation Areas
- a substantial catch-up program of maintenance
was carried out in 1982;
- maintenance upgrading will continue in 1983
under the C 0 E D Program;
- upgrading of refreshment stands;
- revitalizing the nature trails
A maintenance and operations plan at each area will result
in an improvement in quality
- 5 -
B-122
at Black Creek Pioneer Villaqe
- the painting of several buildings in 1982:
- the painting of the Flynn and Burwick
houses in 1983:
- minor repairs to all buildings
Rather than being done on an irregular basis, the maintenance
will be scheduled starting in 1983, and will be carried
out based on a series of scheduled daily, monthly and
quarterly inspections
at the Kortright Centre for Conservation
The approval of the C 0 E D Program, along with the
Fisheries Sector Work Program, the Parks Maintenance
Program, the Student Employment Program, the Federal/
Provincial Employment Incentive Program and both
summer and winter Experience '83 Programs, will
permit
- repairs to, and substantial improvements to
a number of indoor exhibits and outdoor
demonstrations;
- improvements to trails;
- painting, staining and repairs to the Centre
building;
- maintenance of other buildings and facilities
in the outdoors
- 6 -
8-123
(b) Major Maintenance
Regular maintenance is provided for within the annual
operations and maintenance budget of each project
Provision has. not been made for major maintenance.
An adequate major maintenance reserve account must be
established in order that major repairs can be made
when required, without adversely affecting the annual
operations and maintenance budgets
(c) Food Services
The lack of satisfaction from food services was a
I serious impediment to growth at Black Creek Pioneer
Village and at the Conservation Areas: and to a
lesser extent at the Kortright Centre for Conservation
On March 1st, 1983, the Authority started operating
its own food service, on a management fee contract,
with a Food Services Manager in the Authority office
It is anticipated that the quality of service will
improve and food will relate more closely to the
area program and visitor, and become an attraction
encouraging repeat visitation, with a resultant
increase in sales and net revenues
- 7 -
8-124
2 DEVELOPMENT
The Plan recognizes the vital importance of the further
development of facilities to meet the present and future
requirements of the Authority's visitors Without ongoing
development to update the facilities, it will be difficult
to increase, or even sustain, present attendance levels
(a) Conservation Areas
The Marketing Plan recommends facility development to
make the Conservation Areas more competitive in 1983
It has been estimated that a budget of $300,000 would
be required This level of funding is not available
in 1983, but the following facility improvements will
be carried out
- horseback riding at Claireville;
- bulletin boards at the areas;
- development of themes for each area, with
printing and distribution of area brochure;
- development of improved refreshment stands;
- signage review and improvement
Many of the Marketing Plan recommendations are being
evaluated within the Master Planning process for the
Boyd Conservation Area
- 8 -
8-125
(b) Black Creek Pioneer Village
The first phase of the Black Creek pioneer Village
Visitors Centre will begin in 1983, and be completed
for the 1984 operating season
Work will be done on the following buildings in 1983
- Tinsmith Shop and Masonic Lodge
(may be completed);
- further restoration of the Richmond Rill
Manse;
- Sawyer's Rome (landscaping will be
completed) ;
- Taylor Cooperage (will be furnished and
equipped)
Through funding from C.O E D , the following buildings
will be opened and staffed in 1983
- Doctor's Rome;
- Flynn Home;
- Sawyer's Home;
- Taylor Cooperage;
- Dominion Carriage Works
The walkaround map has been improved, to make visitors
more aware of all the Village sales outlets
- 9 -
8-126
(c) Kortright Centre for Conservation
The development of the area was seriously curtailed in
mid 1982 by a cutback in the Ministry of Natural
Resources grant The facility development is now
dependent on funding from contractual arrangements
with Ministries, make-work programs and The Metropolitan
Toronto and Region Conservation Foundation
The following facility developments will be completed
in 1983
- marsh viewing facilities and boardwalk;
- forestry trail;
- outdoor Energy exhibits, including a 10 KW
windmill;
- exhibits for Forestry, Water, Fish & Wildlife
and Renewable Energy Themes;
- additional audio-visuals;
- Land Theme building and exhibits;
- provision of additional eating area;
- theatre seating;
- temporary Wood Arts Centre
- 10 -
8-127
3 POOG~
The innovative programs for the public in the Conservation
Areas, Black Creek Pioneer Village and the Kortright
Centre for Conservation attract additional visitors,
provide increased opportunities for publicity and
promotion, and encourage repeat visitations.
To some extent, special programs tend to counteract
the effect of adverse weather conditions on
attendance.
Some programs, in addition to the admission fee, provide
opportunities for additional revenue from fees for staff
or equipment use, increased sales from food services
and other sales outlets (especially at Black Creek
Pioneer Village and the Kortright Centre for Conservation)
The following programs are scheduled for 1983
- 11 -
8-128
PROGItAMS AND EVENTS ... 1911l
!!2!!.!.!l Con..rvatlon Ar... Black Creek Pion..r Villaqa It'ortriqht Centre tor Con..nation
Janoory ... Sled 009 Rae.. (Cold CeNt) ... SkatLn9. '1'oboqganinq and ... vinue Wildlife DetacU..,. Aik..
... IIletIL....' Tr1al.- ICla,iraviUa BorM-dr."" 5181gh Ride. ... IQtroduotion to Mature Photography
and Cold CrHkl lweatMr penlittin9) ... Mind l!:necqy
Owl Prowl
... GrOUAdhoq o.y previ..
'""nary ... AlItrt.vel' 1'rlah (Ch.r..Ula ... SlLI.tin;, Toboq9a.nin9 and. ... Snow Slake
and Cold Cr..k) Hoca..drawn Sl.i9h R1d.. .. SftOW' Hike.
.. Slutar1 (Bruce'. MUll Cveath.r peraittinvt .. OWl Prowl
.. Sled Do9 bee.. (Cold Cr_k) .. atrdhOu.e Buildinv Nark.hop.
4 H111 Winter C.un1val IBruce'a Kill) .. Wl.ldl1t. "'Drk. ot Clen La..te.
Moarcb .. Sled 00qI Race. (Cold Cre-ek) .. " T...te ot Haple .. Sprinv Tonl.c
. Retri.v.r Trul. (Cl.irevill. - Colourtul Coverl.t. - Sap on Tap (Maple Syrup)
..Cd Cold Cnek) Go Ply a Uu
- Maple Syrup ee.on.tration. .. WildlUe IIlorlr.. ot PraftJI. de Matteis
(Sruce'. Mill)
Aprll - Retriever ?rial.. (Chir..ille " T..te of Moaple - Sprinq 1l00d proqr.. (urly Sprin91
and Cold Cr.ek) - Colourtul Coverlet. Trout r..tl.val
hater 1:99' HWlt 4 Wildflower Bl.k..
- StreUl rlllprovement
May - blablin; Bill. Riding Club PUt-Ti../Play-TiM. 5a"*'l1l Demon.tration.
Hona Show (Albion HUh) Or Zonk . Ku..aUlll of - Ra1n, Runoff and River.
SciantiUc Curiodtie. - Pond St.udy
- Sprinq rail' 4 Bea Spaca
- Mot.her'. OAy (Special
rAAJ.ly a.to)
lUli tary Manoeuvre.
- Oauqhter by Adoption
Wondertul Nool
J.... Rambling Hilh Ridinq Club - Nonderful Mool - Day Hike o&1ooq t.he H\Ull.ber
- Upper CAnadA Rifle. alack Powder - Mak Ing Nood Nark In P lon_I' - Radio Telemetry
ShOot (Cold Cr..k) Ontario - Bee Spac.
- Roq.t10nt.1d. Servl.ca - -SWl- Oay
"ather'. Day (Specl..l
raaily RAtel
JUly - Claireville Open Waterut - Moater Oay Con..rvat1on in the BODIS
Toul'ft&lMlnt - Victorian ....Uy Picnic - RiveraJ.de MlaaAdera
- Ontario W..teraki Ch.ampion.hipa (we.kend.) - as. Spac.
(Cla1reviUa}
CI.1r....ill. Novic. Waterak!
To~nt
GI.n Hatty rahinv Derby
- Rollinq Hilh Ridinq Club
(Alb:Lon 8111a)
A\l9u.t R.adio Controlled 'lyLnq Club ot ,.....luly Fun (....e.kend.1 - Inaeot. AU",
Toronto - Fly-Ln (ColC! Creek) - Rlv.r.ida "'-and.r.
CI.J.reYllle NoYice Waterskl S.. Spac.
Champlon.hlpa Endanqared Specie.
Rolllnq Hl11. Rldlnq Club
Sept4lllber RLde.tJ\on (Cl.LraY11le) Corn '..t Ronay ....tiv.l
Upper C4,ftada R!tlu (Cold Cr..k) - OUtdoor Hf1U1 51ng - It . About Wood !nerqy
Roll Ln9 H1lh RldLnq Club - honeer re.dyal (Sept. 17) Huntin; Shih
Turltey ShoOt fCold Cuelt) - Honey ..air
October Doq Show (Cold Croaltl Celebr.te the Appl. Harye.t Hurricane Ha.el Rell'leSberad
Upper ColIn.d. Rille. (Cold Crllalt) Pumpkin Party
- TurkllY Shoou (Cold Cuekl Hobqoblin. P.r.de
NaY.llber - RetrLever Tn&l. (Cl.ir.vJ.ll. Cratt ....tLval S.wmill Tour.
and Cold Cre.k) Christmaa Ln the viUa9'l B:Lrd "eeder Work.l\op.
Turkey Shoot ,Cold Cnak}
Dec-.mber Retr1.ver Trhla (Cl.ireYUl. ChrlaUlol.. Ln the VUlaq. - Chri.t..Na .LD thei Country
and Cold Cr_k) We r. tor the B:Lrd.
SIu Op.an Hau.. (Albion Bill.)
- 12 -
8-129
Many programs are similar to those carried out in 1982
Some new programs and events are being added and the
least successful programs are being eliminated For
example, five new programs were added to Black Creek
Pioneer Village, and additional "participation" components
are being added where possible.
1984 will mark the sesquicentennial of the City of
Toronto and the bicentennial of the Province of Ontario
The staff is currently studying ways and means of
incorporating special programs and promotions at the
Conservation Areas, Black Creek Pioneer Village and the
Kortright Centre for Conservation, to g1 ve the
publicity a contemporary and fresh approach for 1984
4 HUMAN RESOURCES
The need for more "direct sell" by all staff at each
facility is required if the Authority is to maximize
its marketing efforts. Training programs have to be
targetted at seasonal staff, regular staff and supervisory
staff A program is currently being developed, with the
assistance of the Authority's new Personnel Officer
This program would be interdivisional and be a supplement
to existing divisional programs, providing for training
of staff at all levels on hospitality and selling
- 13 -
8-130
P R I C I N G
The admission fee at the Kortright Centre for Conservation
was increased from $1 00 to $2 00 for adults, and from
$0 50 to $1 00 for students and children, in 1982, with
annual membership being $25. per family and $15 per
individual The fee will remain the same in 1983, as do
the fees at the Conservation Areas and at Black Creek
Pioneer Village ($2 weekdays, $3 weekends per car, $30
per season's pass at the Areas; $4 per adult, $1 75 per
child or student, family maximum $8 00, $25 family and
$15 individual annual citizenship at the Village)
Revenues from citizenships at Black Creek Pioneer
Village and memberships at the Kortright Centre go to
the Foundation's Growth Endowment Fund, with interest
revenues provided to help fund operations and
maintenance at these facilities
As a promotional incentive, during the recent years
substantial discounting has been offered, including free
tickets distributed to selected individuals and audiences
A non-restrictive discount practice should be continued
in 1983, in order to take advantage of private sector
promotional opportunities, and this practice should be
carefully monitored in 1983, to determine its effectiveness
in increasing attendance and revenue
- 14 -
8-131
MARKETING PLAN 1983
COM M U N I CAT ION S S T RAT E G Y
The success of a Marketing Program is predicated on the
availability of product, and Metropolitan Toronto's product
is available in all sorts of packages backed by an extensive
and, in some cases, a nearly overwhelming structure of
support and sales
Metropolitan Toronto's appeals are varied Products are
packaged in dozens of imaginative, appealing and financially
attractive combinations This Authority operates in the
largest and most influential market in Canada, where there
probably exists every element imaginable of a competitive
environment There is no other region in Canada that offers
" as many alternatives for leisure-time activities Consider
the overwhelming number of different. facilities available for
recreational/learning experiences Each one offers differential
pricing and uses varied marketing and communications
(advertising and promotion) strategies
The development of a Marketing Plan by The Metropolitan Toronto
and Region Conservation Authority was initiated in 1980 It
came about in response to a perceived need to increase
attendance and/or revenues at Black Creek Pioneer Village, the
- 15 -
8-13 2
Kortright Centre for Conservation, the Conservation Areas
and Indian Line Tourist Campground
THE CQf.1i'lUiH CATIONS STRATEGY - 1983
OBJECTIVE To maintain the upward trend of attendance at
the facilities that was recorded in 1982
STRATEGY To meet the objective, a program has been
developed which encompasses all aspects of the
Authority's communication activity, including
promotion, publicity, advertising and sales
services
In 1983, the Communications Program will expand on providing
information on the recreational opportunities available in
the Metropolitan Toronto region The program is designed to
take advantage of every opportunity available to compete in
a very volatile and aggressive market place
METHODS News Releases
Photo Releases
News Articles
Newsletters
Flyers
- 16 -
B-133
Radio Public Service Announcements I Synopses
Television Public Service Announcements (60 sec spots)
Paid Advertising (Direct)
Paid Advertising (Cooperative)
Slide Shows
Brochures (General, Black Creek, Kortright, Conservation
Areas and Calendar of Events and Activities)
Brochure Distribution - a) professional services
b) cooperative ventures
c) staff
d) mail
Posters
Annual Reports
Visitors Surveys - Metropolitan Toronto Convention
and Visitors Association
Special Functions I Receptions - a) joint ventures
b) Authority
Special Promotional Techniques - a) discount coupons
b) mail inserts, in
cooperation with
municipalities
Public Speaking Engagements
Placemats
Radio and Television Interviews
Foreign Travel Writers' Tours
Displays
- 17 -
8-134
Exhibits
Signage (Bulletin boards)
Photography
Slide and Photo Library
Word Processing - computerized system for selling
our products and services
Sales Service - Telephone - a) during business hours
b) evenings, weekends
and hOlidays
Media Contacts
Memberships - Tourist and Travel Associations -
a) Metropolitan Toronto Convention and Visitors
Association
b) York Region Tourist Committee
c) Central Ontario Travel Association
d) Tourist Association of Durham Region
Teleguide / Telidon System
The foregoing briefly outlines the Authority's action programs,
specifying those activities that are believed to be critical
to its success Also, as suggested in the Woods Gordon Report,
August 1982, consideration has been given to the Recommendations
for Immediate Action (late 1982 / early 1983) and Short-term
Action (1983) , which identify some of our target markets The
1983 Communications Strategy has allotted the resources
available to programs aimed at these targets, which are
- 18 -
8-135
a) the current user;
b) the potential market - repeat-users and non-users
SU~~~RY RECO~~1ENDATIONS - IMMEDIATE ACTION
(Page VII - Woods Gordon Marketing Plan)
1 a) Training and providing staff for telephone answering
sales work on evenings, weekends and holidays
The staff-operated telephone answering service was
implemented at 5 Shoreham Drive, Downsview, on
March 19, 1983 The program provides for a staff
answering service from 4 00 P m to 8 00 pm.,
Monday through Friday; S 00 a m to 6 00 pm,
Saturdays; and 8 00 a.m. to 4 00 pm., Sundays and
holidays This program has proven to be a very
effective selling service for the Authority's public
use facilities The program has been carefully
monitored, to-date (see Survey - April 1 - 4, 1983) ,
and, after a trial period of approximately 3 months,
the Authority will be in a position to determine
the long-term policy that should be followed with
respect to the service
b) Print material is available in bulk quantities at all
facilities
2 The Village Walkaround Map promotes events, and identifies
areas where food and merchandise can be purchased
- 19 -
8-136
3 Continuing with selective paid advertising and cooperative
advertising
a) Travel and Tourist Associations
b) Heritage Magazines
c) Naturalist Publications
d) Camping Books
4 Many school children visiting the Authority's facilities
receive the general brochure
5 Bulletin boards are being installed in high traffic locations,
at each of the Authority's sites, to promote special events,
as well as the other Authority facilities In the
Conservation Areas, this is being done in conjunction with
a new program that the Cbnservation Land Management Division
has initiated
6 The Authority invites media contacts to a number of special
events throughout the year, which may include luncheons,
barbecues, Arbor Day, etc
7 a) Contact with ethnic groups has been enhanced lately
through the ethnic newspapers of the region
b) Contact with corporate groups will be made possible by
an extensive selling program that will soon be
launched using the word processing system
8 The Authority plans to upgrade distribution of literature
to libraries, recreational stores, municipal offices, etc ,
as part of the C 0 E D Program
9 Increased placement of displays and exhibits in shopping
malls, municipal offices, etc , is also included in the
C 0 E D Program
- 20 -
8-13 7
10 Major site signage has been considerably upgraded at the
Kortright Centre, but changes elsewhere are not easily
accommodated due to the regulations of the Ministry of
Transportation and Communications Upgrading of site
signage, to facilitate visitor orientation in the
Conservation Areas, is included in the Conservation Land
Management Division's plans for this year
SUf:lI,lARY RECOm'1ENDATIONS - SHORT - TERr1
(Page VIII - Woods Gordon Marketing Plan)
1 Telidon terminals have been in place at Black Creek
Pioneer Village since October 1982, and terminals will
-
be installed at Indian Line Tourist Campground and
the Kortright Centre for Conservation by the end of
April There are presently 290 Teleguide / Telidon
units installed in the Metropolitan Toronto region,
located as far west as Oakville, east to the Metro
Zoo and north to Canada's Wonderland The T.eleguide
\
system currently has more than 14,000 pages of
information, with the average usage per terminal being
approximately 700 to 800 pages per day The Teleguide
units are installed in twelve shopping centres, and
this number will increase by 10 within the next month
The average usage rate per terminal in these shopping
- 21 -
8-138
centre locations is over 2,000 pages per day During
the week of March 21 to 27, more than 1,650,000 pages
of information were looked at The material on the
Teleguide system is also available at the Ontario Travel
Centre ~n Barrie, the Palace de Congress in Montreal anq
the Vista system located in 400 home terminals across
Ontario As well, some hotels have in-room data
availability The Authority has 15 pages of information
on the Teleguide system, promoting the facilities and
programs at 8lack Creek Pioneer Village, the Kortright
Centre for Conservation and Indian Line Tourist
Campground, as well as the special events taking place
in the Conservation Areas All the material is cross-
indexed with each of the facilities
2 Increased direct selling activity to groups, clubs and
associations will soon be taking place, now that the
word processing unit is ready to be used
3 The Authority's functions are organized by the Information
Staff, and special events and programs that take place at
the Authority's facilities are the responsibility of the
operating Divisions
The balance of these recommendations have been adequately
explained under the Immediate Action Summary
- 22 -
B-139
TRAVEL TRADE
In 1983, the Authority will become more involved with the
Travel Trade Industry, directing efforts at travel agents
and group travel planners so that they may be aware of its
products and facilities Up to this point, material
regarding the Authority's operations has been distributed
to travel pla~ners by the Ministry of Tourism and Recreation
and the Metropolitan Toronto Convention and Visitors
Association, as part of their travel trade campaign The
Authority has applied for membership to the American Tour
Brokers Association and its Canadian counterpart Therefore,
the opportunity to more effectively promote the Authority's
facilities will be enhanced This program will require a
commitment from operating management
C.O.E.D, PROGRAM
SUPPLEMENTAL .MARKETING ACTIVITIES
The objective of the project is to supply additional support
for the marketing program currently in progress
Activities of the proposed project include
1 Distributing promotional literature to libraries,
community centres, information booths and trade shows,
via a supplied vehicle
- 23 -
8-140
2 Acting as resource persons for the general public, when
staffing the Authority exhibits at local shopping centres,
malls and trade and recreation shows
3 Monitoring visitor trends and attendance levels at special
program events
4 Conducting necessary research, and monitoring on a project
basis, as required
Gross
Staff Labour Material Costs Proiect Costs
5 $63,777 Vehicle, Literature, Uniforms $91,577
$27,800
TORotHO SESQU I CENTENN iAL
March 6, 1984 marks the 150th anniversary of the incorporation
of Toronto To commemorate the event, an ongoing city-wide
celebration is planned to involve every citizen of Toronto, and
to lure more visitors to the city than ever before -- a boon
to the hospitality industry
The Authority should be making plans to participate in this
celebration, as well as Ontario's Bicentennial
- 24 -
B-14l
The development and implementation of quality programs, a
pricing structure and a delivery system at all Authority
facilities, combined with an effective Communications
Program, are the keys to successfully achieving the goals
set by operations management for 1983.
,
- 25 -
ell
I
I-'
01>-
N
W E EKE N D TEL E P H 0 N E A N SHE R I H G
DATE April 1, 2, 3, 4
PERIOD 8 - 9 am 9 - 10 am 10 - 11 am 11 - 12 N l2N - 1 pm 1 - 2 pm 2 - 3 pm 3 - 4 pm 4 - 5 pm 5 - 6 pm
CALLS Gen Sp Gen Sp Gen Sp Gen Sp Gen Sp Gen Sp Geo Sp Gen Sp Gen Sp Gen Sp Total
BLACK CREEK 14 84 3 84 7 71 2 38 3 27 2 14 3 13 1 8 2 2 1 380
KOR'l'RIGlIT 6 1 30 43 24 1 24 1 12 12 1 1 1 157
CONSERVATION
AREAS 8 2 15 5 14 3 10 8 2 9 2 4 2 7 3 94
MULTIPLE 6 I 13 14 13 8 4 3 4 65
BUSINESS 11 33 31 23 16 15 14 22 1 166
'l'OTAL 48 183 196 145 100 71 53 48 14 4 862
- 26 -
B-l43
RESEARCH} r.1OtHTORING AND CONTHOL
If the Authority intends to adopt a marketing approach to
its public use facilities, continuing and increased
research and monitoring data must be collected and interpreted.
This would include updating the Visitors Survey, monitoring
the effectiveness and reaction to special events and
promotions, measuring changes and reaction to food services,
monitoring telephone enquiries, survey of non-users, and
monitoring the effectiveness of free passes and discounts
The data collection and tabulations have been provided ,for
within the C 0 E D Program It is essential that professional
assistance be obtained in developing the questionnaires,
methods of sampling, sampling size and analysis and
interpretation of the data
To measure the effectiveness of The Plan, it is essential to
establish predetermined bench marks as an index against which
to measure attendance and/or revenue at the Authority's
public use facilities
- 27 -
8-144
SCHEDULE IIB"
To The Chairman and Members of the Executive Committee, M T R C A
From Mr R. K Cooper, Administrator, Historical Sites Division
Re Progress Report - January 1 to March 31, 1983
-
- HISTORICAL SITES PROJECTS ( Deve lopmen t)
=-
A town barn has been re-erected behind the Hackenzie Home It
originally stood at the Toll Gate between Woodbridge and Kleinburg and
was owned by Lex Mackenzie's family The building has been restored
through the generosity of Lex's two nieces, Jessie Glynn and Je~n Agnew,
- and a sizeable donation from the York Chapter of the Pennsylvania German
Folklore Society
All of the machinery for the Nesbitt Sawmill has been moved on site
and most of the structural work has been completed .
RISTORICAL SITES PROJECTS (Operations & Maintenance)
-
- (a) Registration and Artifacts
During the first quarter of 1983 the Village received 36 items from
7 donors An 1830 York County cupboard on long term loan from Ontario
- Heritage Foundation has been placed in Half Way House kitchen. Black
- Creek again loaned several items to C B C for its student quiz "Reach
for the Top"
The Grange, Art Gallery of Ontario, was assisted by the loan of a
- large number of artifacts for an exhibit relating to the making of maple
-
s ug ar
- A volunteer has assisted the registrar several hours each week
- (b) Publicity and Promotion
Commercial photography in the first quarter of 1983 included a week
- long production for Xerox by Glen-Warren ~roductions Limited; a segment
- for the feature film "Dead Zone"; and a cover shot and fashion layout for
- Eaton's Christmas Gift Catalogue
Media coverage for January, February and March was aimed at the
Village opening and the Ta~e of Maple program The "Toronto Star",
"Globe and Mail" and nSunlt ran photographs in early March to publicize
- the Village and the Maple program
C B C ' s "Fresh Air" interviewed Jeanne Hughes at the end of March
- to publicize the Village and upcoming events
Staff members have given several lectures in recent weeks Mr
- Cooper presented a paper at an Ontario Historical Society seminar on
-
- ArChitectural Heritage Presentation; Mrs Jeanne Hughes spoke at two
o H.S seminars on Preparing for Ontario's Bicentennial Mrs Hughes also
opened an exhibit of hooked rugs p=esented by the Heritage Rug Rooking
- Guild at the Toronto-Dominion Centre
- (c) Special Events
In the first three months of 1983 two weddings and one Church service
were held at the Fisherville Church Three banquets were held at the
Half Way House
The food services contract covering Half Way House diningroom and
the snack bar at the Village ended in February Warren Rill Catering was
replaced by a new food services arrangement operated more directly by the
Authority through Dalmar Foods Ltd There is now a food service manager,
Mr Ken Hannan, working in the Authority office
On March 31st the Masonic Order held a formal sod turning ceremony
for the Tinsmith Shop/Masonic Hall being restored at Black Creek The
Masons are raising the monies to restore this building, and construction
will start in mid-May
.--
.~~
- (d) Building and Grounds Maintenance
Regular winter cleaning for all Village buildings was completed for
the opening on March 19th Half Way House dining room kitchen was
- repainted and the equipment was cleaned and overhauled. The Village staff-
- room was also repainted
One wagon was completely rebuilt and the other overhauled and
repainted. Apple trees and other shrubs were pruned, and the gardens
- prepared for spring planting Many of the picnic tables were re-stained
and 90 steel drums were prepared for use as garbage containers in the
parking and picnic areas. Additional outdoor lighting was installed for
evening use at weddings and banquets. A cab was fabricated for the
-- tractor, and this will make it more comfortable for winter use
(e) Livestock
Over the winter five colts were being trained and two or three will
- be used on the wagons this season. Three lambs were born in March and
- the rest are due in mid-April. Two older horses were sold before the end
of the year.
(f) Staff
Several staff members attended an Ontario MuseUM Association Conference
on Work in the Nineteenth Century Mr. Cooper attended a series of Senior
- Management seminars sponsored by the Ministry of Tourism and Recreation.
-
- (gl Visitors Centre
Early in March the Ron. Bruce McCaffrey announced that the Authority
- had been successful in its application to Wintario for $530,000. Architect
Gordon Cheney is busy preparing plans and specifications, and construction
- should start prior to July 1st The Authority has authorized a request
- to Lottario in the amount of $l,833,000 to complete the total project.
EXPENDITURE A..~D REVENUE STATEMENT
JANUARY 1 TO MARCH 31, 1983
- EXPEND ITURE
HISTORICAL YEAR , OF FORECAST
-- SITES PROJECT TO DATE BUDGET TO
- (DEVELOPMENT ) EXPEND. BUDGET USED DEC 31/83
-
34,026 l,995,000 l.7 1,995,000
HISTORICAL
- SITES PROGRAi."1S YEAR , OF FORECAST
(OPERATIONS & TO DATE BUDGET TO
- MAINTENANCE) EXPEND . BUDGET USED DEC. 31/83
339,411 l,760,322 19 3 l,760,322
REVENUE
-
1983 RECEIVED , OF INCOME
PROG~ BUDGET MARCH 31/83 RECEIVED
-
1,451,6S0 50,Ol3 3.S
- FINANC:IAL COMMENTS
Village attendance for the winter program was 12,253, down 3,549
from 1982. The complete lack of snow and poor conditions for maintaining
the rink explain this decline. Correspondingly, the gate revenue is
down by almost S7,000.00, to Sl8,75S.00. Gift shop and Village revenue
are also down by approximately $6,000.00.
The number or citi:ens for 1983 is 252 This compares with 196 for
the same period in 1982, and 230 for 1981
The Dickson Hill School Program continues to be fully bOOked and
both school break weeks were booked in March.
The Village has received approval for 33 persons to be hired on
t.'1e C. 0 . E. D Program. This program will enable the Village to re-open
two buildings planned to be closed for the 1983 season, ocen several
buildings not opened before, take visitor surveys, and carry out needed
labour intensive maintenance
1983 04 15
,
B-146
STAFF PROGRESS REPORT
Property Section
During the period January 1, 1983 to March 31, 1983, the Property Section of
the Finance and Administration Division completed the acquisition of 15 new
properties containing 332 398 acres. The total acreage of lands owned by
the Authority, as of Ma~ch 31, 1983 is 27,832 142 acres
During the period the property Section spent a considerable amount of time
in the preparation, negotiation, and processing of shoreline management and
erosion control agreements. The Property Section also carried out all of
the administration management requirements in connection with
Authority-owned lands; i e. agreements, easements, assessments, taxes,
leases, rentals, insurance, etc
A breakdown of the properties and acreages acquired by the Authority to date
is as follows
ET08ICOKE CREEK WATERSHED
Flood Control and Water Conservation
- 1 property settled during period containing 0 841 acres;
- 1 purchase
- Etobicoke Creek Flood Plain Lands
- Commercial and Home Builders Ltd Property, located west of the West
Mall north of The Queensway, Borough of Etobicoke
- 1 property sale during period comprising 0 786 acres;
Snelgrove Dam and Reser~oir Lands
- sold to the City of Brampton for road and bridge construction purposes
(0 786 acres)
,
Total to date--67 properties acquired containing 453 521 acres;
- 2 expropriations outstanding
Conservation Area
Total to date--l0 properties acquired containing 418 866 acres;
Total of Watershed 77 properties acquired containing 872 387 acres
MIMICO CREEK WATERSHED
Flood Control and Water Conservation
- 1 property settled during period containing 0 108 acres;
- 1 purchase
Mimico Creek Flood Plain Lands
- Estate of Stella Orr Property, located west of Beaucourt Road in the
vicinity of Berry Road, Royal York Road, and Oakfield Drive, Borough of
Etobicoke
- 2 properties expropriated during period comprising 0 340 acres; (Permanent
Easements)
/2
B-147
- 2 -
Mimico Creek Flood Plain Lands
- J. Szybalski Property,
- W vasis Property,
located at the rear of Oakfield Drive, in the vicinity of Beaucourt
Road, in the Queensway/Royal York Road area, Borough of Etobicoke
Total to date--40 properties acquired containing 84.628 acres;
- 2 expropriations outstanding
Total Watershed: 40 properties acquired containing 84.628 acres.
HUMBER RIVER WATERSHED
Flood Control and Water Conservation
- 5 properties settled during period containing 5.289 acres;
- 3 purchases
- 2 permanent easements
Humber River Flood Plain Lands
- Replete Investments Limited Property, located on the north side of
King street, east of Humber Lea Road, in the Bolton area, Town of
Caledon (1 Purchase; 1 Permanent Easement)
- Town of Richmond Hill Property, located east of Bathurst Street,
north o~ King Sideroad in the Oak Ridges area, Town of Richmond Hill.
(1 Purchase; 1 Permanent Easement)
- Municipality of Metropolitan Toronto Property, located on the east
side of B~ack Creek Drive, north of Industry Street, City of North
York.
- 2 property sales during period comprising 6 782 acres;
Claireville Dam and Reservoir Lands
- sold to the Ministry of Government Services to facilitate the extension
of Finch Avenue (6 782 acres)
Total to date--780 properti.es acquired containing 8,548 231 acres;
Conservation Areas
Total to date--79 properties acquired containing 4,305 773 acres;
Forest and Wildlife Areas
Total to date--l0 properties acquired containing 786 486 acres;
Agreement Forest Lands
Total to date--23 properties acquired containing 1,865 745 acres;
Niagara Escarpment Lands
Total to date--4 properties acquired containing 25l.926 acres;
Total of Watershed 896 properties acquired containing 15,758.161 acres
13
B-148
- 3 -
DON RIVER WATERSHED
Flood Control and Water Conservation
- 2 properties settled during period containing 30 952 acres;
- 2 purchases
- Don River Flood Plain Lands
- Municipality of Metropolitan Toronto Property, located on the west
side of the Don Valley Parkway, north of Millwood Road, 80rough of
East York.
- E Glina property, located on the west side of Old Cummer Avenue,
south of Cummer Avenue in the Bayview and Finch Avenue area, City of
North York
- 1 property sale during period comprising 0.332 acres;
- Willowdale Dam and Reservoir Lands
- sold to E Glina in a land exchange (0.332 acres)
Total to date--188 properties acquired containing 1954 812 acres;
- 4 expropriations outstanding
Conservation Area
Total to date--l property acquired containing 9 350 acres;
Total of Watershed 189 properties acquired containing 1,964 162 acres
HIGHLAND CREEK WATERSHED
Flood Control and Water Conservation
Total to date--143 properties acquired containing 823 911 acres;
Conservation Area
Total to date--2 properties acquired containing 118 626 acres;
Total of Watershed 145 properties acquired containing 942.537 acres
ROUGE RIVER WATERSHED
Flood Control and Water Conservation
- 1 property sale during period comprising 0 959 acres;
Milne Dam and Reservoir Lands
- sold to the Region of York for road widening purposes (0 959 acres)
Total to date--119 properties acquired containing 2,107 842 acres;
/4
8-149
- 4 -
ROUGE RIVER WATERSHED continued
Conservation Area
Total to date--2 properties acquired containing 267.038 acres;
Total of Watershed 121 properties acquired containing 2,374.88 acres.
DUFFIN'S CREEK WATERSHED
Flood Control and Water Conservation
- 1 property sale during period containing 1 236 acres;
- Stouffville Dam and Reservoir Lands
- sold to the Town of Whitchurch-Stouffville for road extension
purposes (l 236 acres)
Total to date--90 properties acquired containing 9ls 152 acres;
Conservation Area
Total to date--l9 properties acquired containing l,076.s68 acres;
Forest and Wildlife Area
Total to date--l6 properties acquired containing l,749.696 acres;
Agreement Forest Lands
Total to date--l property acquired containing 93.000 acres;
Total of Watershed 126 properties acquired containing 3,834 416 acres.
PETTICOAT CREEK WATERSHED
Flood Control and Water Conservation
Total to date--l property acquired containing 22 139 acres;
Conservation Area
Total to qate--l property acquired containing 177 918 acres;
Total of Watershed 2 properties acquired containing 200 057 acres
LAKE ONTARIO WATERFRONT
Waterfront Plan
- 4 ?roperties settled during period containing 294 868 acres;
- 4 purchases;
/5
B-150
- 5 -
- Etobicoke Sector
- Ministry of Natural Resources Property, located south of Lakeshore
Boulevard, in the vicini ty of Park Lawn Road, in the Borough of
Etobicoke
Pickering/Ajax Sector
- Region of Durham property, located on the north side of 8eachpoint
Promenade, east of West Shore Boulevard, in the Frenchman's Bay area,
Town of Pickering
- Scarborough Sector
- Estate of W. A Tiffin Property, located south of Lawrence Avenue
East, in the Chesterton Shores area, Borough of Scarborough
- Federal Government Property, located in the Sunnypoint Crescent/
Eastvil1e Drive area, Borough of Scarborough
Total to date--27s properties acquired containing 1,751 484 acres
Conservation Area
Total to date--9 properties acquired containing 49 430 acres;
Total of Lake Ontario Waterfront
.
284 properties acquired containing 1,555 476 acres
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
January 1 - March 31, 1983 - 11 properties settled containing
37 530 acres;
(- 7 purchases;
- 2 permanent easements
- 2 expropriations during period)
- 6 property sales
Total to date--l,428 properties acquired containiing 14,910 236 acres;
- 8 expropriations outstanding
CONSERVATION AREAS
January 1 - March 31, 1983
Total to date--123 properties acquired containing 6,423 569 acres
/6
B-lsl
- 6 -
FOREST AND WILDLIFE AREAS
January 1 - March 31, 1983
Total to date--26 properties acquired containing 2,536 l82 acres.
AGREEMENT FOREST LANDS
January 1 to March 31, 1983
Total to date--24 properties acquired containing 1,958.745 acres.
NIAGARA ESCARPMENT LANDS
January 1 to March 31, 1983
Total to date--4 properties acquired containing 2sl.926 acres.
WATERFRONT PLAN
January 1 - March 31, 1983 - 4 properties settled containing 294.868
acres;
(- 4 purchases)
Total to date--275 properties acquired containing l,7sl 484 acres
,
GRAND TOTAL OF ALL PROJECTS
January 1 - March 31, 1983 - 15 properties settled containing
332.398 acres;
(- 11 purchases;
- 2 permanent easements;
- 2 expropriations during period)
- 6 property sales
Total to date--l,880 properties acquired containing 27,832 l42 acres;
(11,263 668 hectares)
- S expropriations outstanding
DO!aw
1983 04.25
B-152
TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
M T R C A - Meeting #6/83
FROM MR J C MATHER, AD~~NISTRATOR, WATER RESOURCE DIVISION
RE WATER RESOURCE DIVISION PROGRESS REPORT FROM
JANUARY. 1, 1983 .T.o MARCH. 31, .1983
The attached progress report is presented for the period January 1, 1983
to March 31, 1983 The report details both the physical and financial
progress of the various programs and projects in the Flood Control and
the Waterfront Sections Also included is a status report on the Fill
Violations as prepared by the Development Control Section
Attachments
1983 04 25
JCM/md
OPERATING STATEMENT PAGE 2 J
BV PROGRAM PERIOD ENDING 830331 REP 109
- --- ._~ - "-
E X PEN D I T U RES REVENUE
g_a~=a_~=~==~:~~;=~=~==~~~.==_~:~=m~~-~_~~;Q~=~~~CQ;a ~gO._~:~~=~QE=G~~~_~;c=m===a~===_~R~_g=
M-T-D V-T-D X FUNDS "-T-D Y-T-D X
BUDGET ACTUAL. ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD
iilili:lc:c;:::zg;: g;Il:C==~ m=a=a== ........ a;...~:I;_==m.a: a811:;;II:; :I "--- .CDli:l.m._ - SUiIl=:l__=_ -=:;;;a:= -- .-.
WATER RESOURCE - FL.OOD CONTROL.
=~~A=Q~~"Aa~a~a#~~a_~aQm;g=~~~
ADMINISTRATION-FLOOD CONTROL 743.652 66.851 190.079 2~ 0 553.573 743.652 5,382- 5.3S2- 7
METRO - EROSION CONTROL 396,500 32.322 79.844 20 1 316.656 390.500 27,900- 27.900- 7 0
.-.~
YORK - EROSION CONTROL. 23.500 9.589 9.752 41 5 13,748 23.500 1.400- 6 0
PEEL - EROSION CONTROL. 35.600 0 35.600 35,600 0
DURHAM - EROSION CONTROL ~.OOO 0 5.000 ',000 0
--------.--, -"--
PlANNINQ AND REMEDIAL. MEASURE 1.343,500 20.530 112.675 8. 4 1.230.825 1.343.lK>0 0
RIVER FORECASTING, OP " HAIN 119,637 8,270 29,220 24 4 90,417 119,637 0
SMAL.L DAMS, CtIAN. Ir ER CONT 244,000 18,769 45,784 18.8 198.216 244,000 0
- -- ---------- -- --
-------------------------------------.- -~------------ ---------------------------------------
TOTAL 2, 911. 389 156,332 467,354 16 1 a, 444, 03:) a, Ii11, 389 33,282- 34,682- 1 2
-------------------------.---------- ----.------------ ---------------------------------------
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL
- - __u -- - - . - - ---- ----.--- ----- --------.- -- - '-.- -- - --
- ----~--- --- ---- -- . -- -- - ~__.n -
- .- --~-- .- n___ -- - -- .- ----.--
D:I
I
......
LD
w
- - -. - -- .-- -- ---.. -- --------- - - +-- - - .--.- -"-- -"---
-- _. - -- ---- -' - ---- - -- ---- ---- --
- -- - - - -- - -- -' - - - -- -- -- +- -- ~ - -- - - -- -- -- ---- -~ -- -- -
- -- -' ------ -
- - .. .. - ----~1
OPERATING STATEMENT PAGE 3 ~
BY PROGRAM PERIOD ENDING 830331 REP 109 ~
- -- --- - - - --- .
E X PEN D I T U RES REV E N U E
~~a=a~=~==~c=====~=~===~=;~===;==~===_=~_~====~~===~~ =~~~=a==~~~===~=~=:========a~~=====c=~=
M-T-P Y-T-D Yo FUNDS M-T-D Y-T-D X
BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD
==_;::c':c:I G==ac=a:: _~&I=llDa :I'I:iI= ===cn::uz:=ZI= -- - - ====-== - - --:c::=c;::ta---- =a=IS';Ii= - ~==I:l -~----
WATER RESOURCE - WATERFRONT
=C=~Q~g;==GQ==~g====~==_=~G
ADMINISTRATION-WATERFRONT 211,239 16,489 45, 129 21 4 166, 110 211,239 0
CAPITAL DEVELOPMENT 1.~31,261 20,3~1 84,4~4 5 5 1,446,807 1, 531,261 300- 300- 0
-~-' --- ~--- ~ 01
SHORELINE MANAQEMENT :182,500 671 1,855 3 580,645 582,500 0
MAINTENANCE 0 0
-------------------------------------- -~------------ ---------------------------------------
TOTAL 2,325,000 37,511 131, 437 5 ., 2,193,563 --- - 2,325,000 -- ~OO-- - 300- 0
----------------------------------- ----~------------ ---------------------------------------
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL
- - -- ~ - - - - -- -- -- - ---- -- - ~-
,
-- -- -- - --- - - _________ __ _____u_____ ~~ - --- --
- - - -- ---- - -- - -- --- -- !
- - - --- -- ---.--- -------- - -- ---- ---
-- - -- --- --- --- -- -- - 0
- ---- --- - ---- ~---- -
.- -- - ---
......
B-lss
- 2 -
g;I:l~~~~~~~~
Erosion Control - Metro
Major remedial works haveoeen completed, at the wynford Keights Crescent
site in the City of North York.
Private revenues, in the amount of $27,900.00, which were received this
year but not included in the budget figure are reflected in the overall
expenditure for this activity
Major work at Beaucourt Road and Delroy Drive are scheduled for later
this year.
Erosion Control - peel
Remedial work at Albert Street in Bolton is scheduled for later this year.
Erosion Control - York
Remedial works at Kirby Side Road have been completed.
Private revenues, in the amount of $1,400.00 which were received this year
but not included in the budget figure are reflected in the overall expenditures
for this activity
~mwI~
Major maintenance in Lower Humber Channels and the Palgrave Dam is scheduled
for later this year
Regular maintenance of our water control structures has been carried out
within the established budget guidelines.
~~~g=~~~J;Mt=~~g
Remedial Works
Channel improvement works have been in progress on the Main Branch of the
Rumber River in Bolton. The major part of the heavy construction has been
completed. Final grading, cleanup and restoration should be completed by
the end 0 f June, 1983
Preparation of the final design drawinqs and tender documents for Phase II
of the Bolton Project is in progress.
Keating Channel Study
The Keating Channel Environmental Assessment report has been received and
forwarded to the Ministry of Natural Resources and the Municipality of
Metropolitan Toronto for their review and approval prior to formal
submission to the Ministry of the Environment.
Environmental Planning
Environmental Inventory reports for the erosion control program were drafted
A literature review and mapping exercise of aquifers and groundwater systems
in Uxbridge area was completed A start on the collection of backqround data
for input into master drainage planning has been initiated Master drainage
planning will be a major activity throughout 1983.
/3 .
B-ls6
- 3 -
~~~~~~~~~
Colonel Samuel Bo.is. Smi.th Waterfront Area
- The base for the entrance road was completed and a contract has been
awarded for paving
- The control equipment has been ordered for use in the revenue collection
system and the site should be ready to start filling by June 1, 1983
- Plans for the staging of landfilling operations are being prepared for
approval by the Ministry of the Environment
- Names on the waiting list for moorings now totals 63
- The Borough of Etobicoke, Humber College and the Ministry of Government
Services are all involved in a planning review of the future of the
Lakeshore Psychiatric Hospital
Humber Bay West
- A contract for paving the expanded parking lot adjacent to the boat
launching ramps has now been awarded
- The Boating Clubs are proceeding with preparations for additional
landscaping in 1983 Both Clubs are developing plans for Club House
construction
- The Mimico Cruising Club is developing a dinghy sailing facility and
a service dock
- Plans for an Official Opening of Humber Bay West Phase II in 1983 are
underway
Aquatic Park
- The Ministry of Natural Resources is negotiating a lease to the Toronto
Harbour Commissioners for an area large enough to complete the endikement
and place final armouring on all headlands The Toronto Harbour
Commissioners will be doing the armouring with funding from revenues from
the fill operation
- The Authority has established the "Aquatic Park Planning Task Force" to
reactivate planning of future recreational use of the Leslie Street
Spit and the endikement
Bluffers Toplands
- The demolition of the former filtration plant on Fishleigh Drive is
nearing completion and the plans for restoration and grading have been
completed
- Plans are being reviewed for the proposed development of the former
Seminary lands in an effort to address some of the concerns of local
residents
Bluffers Park
- Preparations for spring planting on the easterly parts of Phase II were
completed
- Plans for paving the easterly road extension and the public parking lot
are being completed
/4
B-1S 7
- 4 -
Bluffers p-ark c.Cont'dl
- All four boat clubs have ambitious development programs planned for early
implementation
- The master plan amendment which proposes a marina facility on the westerly
side of the boat basin has been approved by Metropolitan Toronto and will
soon be dealt with by the Borough of Etobicoke
East Point P-ark
- Detailed planning for excavation and grading as well as site servicing
is underway.
Ajax Waterfront
- A detailed planting plan has been finalized and work is scheduled to
commence in several areas by May l, 1983
Shoreline Management
- Property negotiations are being completed in preparation for shoreline
protection at Lakehurst Crescent.
- A project for erosion control in Bellamy Ravine was prepared
- An erosion problem at the west end of Scarborough Bluffs adjacent to
Fallingbrook Drive is under review and will require remedial works this
year
Environmental Monitoring
- The results of the 1982 waterfront monitoring program are being compiled
in report form.
- During the first quarter of this year, the automatic temperature recorders
monitoring the lake trout shoals at Bluffers Park were retrieved. The
success of the over-wintering eggs will be investigated through diver
examination in the near future
- Initial planning for the 1983 field season is underway, including
discussion with the Ministry of the Environment concerning the monitoring
agreement requirements for the Colonel Samuel 80is Smith Waterfront Area.
Imd
-
'lO: THE CHAIRMAN AND MEMBERS OF 'TIlE EXECUl'IVE CXM1ITl'EE, M.T R.C.A., - I 9"83 PAGE I OJ
I
f-'
FRa1: JOHN W MALEI'ICH, MANAGER, DEVEWFMENl' CCNI'OOL SECrION ~
RE Aa-illlISTRATION OF ONTARIO REGUIATICN 170 - ~ & DEX::EMBER, 1982 AND JANUARY - MAOCH, 1983
ENF OFF.
LOCATION DETAILS OF VIOLATION NOTICE ThIITIALS ACTION TAKEN
Borough of Scarborough V-478, Mr William Wai LelIDg Chan -Fill ReIroved.
lDt 165, Plan M-440 tbventJer 22, 1982 00 -Area Restored and Seeded.
#32 ~liffe Drive 3(b)
Waterfront V-4 79, Victoria Const. Ltd
November 22, 1982
3(b)
ToNn of Markham V-480, Frederick & Lillian -Filling Stopped.
Part lDt 14, Concession 4 Pinarello 00 -Restoration to be urrlertaken
#7 Buttonville Crescent East November 24, 1982 in Spring of 1983
Ibuge River Watershed 3(b)
City of Mississauga V-481, Joseph Kaufnan Enterprises -This matter is before the Courts.
-Trial date is set at May 20, 1983.
Part lDt 1, Concession 1, S.O.S. (The Kitchen Centre) lWl -Provincial Court (Criminal Division)
#2050 Durrlas Street East Decenber 1, 1982 424 llensall Ci=le, MISSISSlIUGA, Ct1t.
Etobicoke Creek Watershed 3(b)
City of Brampton V-482, Ketherine Hluszko -cMner has been made aware of the
Part lDt 17, Concession 8 Decenber 7, 1982 lWl Authority's concenLS
SOuth side of 17th Sideroad 3(c) -No further interference activity has
HlID1ber River Watershed been tmdertaken.
City of North York V-483, Mr D. Kern -Filling stopped.
lDt 24, Plan M-754 December 14, 1982 [1>1 -Material to be renoved as soon as
Rear of #4 Page Avenue 3(b) weather penni t.s
Don River \'latershed V-4a4, Davmark DeveloflIel1ts
~l~ 14, 1982
3(b)
/L
1983.03 31
'10: THE CHA.IRMAN lIND MEMBERS OF THE EXEXl1l'IVE a::t-lMITrnE, M.T.R.C.A.., - . ~83 PAGE II
FOCM: JOIlNW MALEl'1CH, MANAGER, DEVEUlIMENl' <XNl'RlL SECl'IW.
RE: AIMrNISTRATIW OF CNl7\RIO RmJIA'l'IW 170 - NJJE:.IBER & DEUMBER, 1982 AND J1\WARY - MARCIl, 1983-
DETAILS OF VIOLATION NOTICE ENF.OFF ACTION TAKEN
LOCATION INITIAIS
City of North York V-485, Jack Greedy Limited -FilliD] stepped.
lot 24, Plan M-754 December 15, 1982 l>>t -f4aterial to be raroved as soon as
Rear of 14 Page Avenue 3(b) weather permits.
Don River Watershed
TcM1 of Ri.chnqd. Hill V-486, Ade Kushnaro
lDt 3, Plan 65M-2078 January 19, 1983 >>I -Mr. Kustmaro is na.t aware of the Authority's
Don River Watershed 3(b) oonc:enl5.
-No further activity has been tmiertaken.
To.m of PickeriD] V-487, Stanley & Daris Callaghan -Alteration st:.owed.
N. Pt. lot 13, Con. 6 February ll, 1983 D'l -court action by MNR, wder the Lakes and
Duffin Creek Watershed 3(c) Rivers Inprovaoont Act.
V-488, Don ~ers Construction -Enforcement staff participating in Court
February 11, 1983, 3(c) action.
TcM1 of Caledoo V-430, Jaffre Bellc:hanber -charges ~e laid and the trial date was
Pt. lot 9, Cancessioo 6 April 26, 1982 PM tt:lvaltler 12, 1982, Provincial Court
191 Sackville Street (Boltal) 3 (a) and (b) (Criminal Division)424 IIensall Circle, MISS
'HlIIber River Watershed -A conviction was registered - fine of $250.00
plus renDVal of the offenclinJ uaterial waS
ordered by the Court. Fill na.t renoved.
-
City of Mississauga Pacific PaviD] Ltd. l\H -charges laid Ck:t:QJer 29th, 1982.
15845 4th Line East
Etcbicoke Creek Watershed 3(b) ~ 7, 1983: Calvicted and Fill OJsl;1ered
Iewved.
,
/.L.
1983.03.31 b:I
I
I-'
VI
\D
B-160
TO The Chairman and Membp.rs of the Executive Committee, M.T R.C A ,
Meeting Jl6/83 - Wednesc9ay, May 4, 1983
FROM T E Barber, Administrator, Information and Ec9ucation Division
RE INFORMATION AND EDUCATION DIVTSION - PROGRES~ REPORT
January 1 - March 31, 1983
CONSERVATION INFORMATION SECTION
The Conservation Information Section carries out the Authority's general
information program, as well as programs relating to the resource management
activities and the marketing of the Authority's revenue generating facilities
- Black Creek Pioneer Village, the Kortright Centre for Conservation and the
Conservation Areas
COMMUNITY RELATIONS - INFORMATION - GENERAL
Printing Highlights
- the Authori ty' s 1982 Annual Report was printed and is currently being
distributed
- the 1983 Directory has been prepared and will be pri n ted later in April
- distribution of the Authority's general brochure and the 1983 Calennar of
Events anc' Activities (Winter and Spring) has taken place, as scheduled
- news ann photo releases were printec' and distributed, regarding the
}\uthority's 27th Annual. Inaugural Meeting, the Budget Meeting, appoint-
ment of .the new Chairman, the Canada/Ontario Employment Development
Program ann the signing of the cooperative agreement be~ween the
Authority and the Board of F::c'lucation for the Borough of Etobicoke
Tours and Spec-ial Days
- staff organized and carried out arrangements for
a) the 27th Annual Inaugural Meeting at the City of North York, on Friday,
February 11th
b) the Ceremonial Aqreement Signing at the Half Way House, Black Creek
Pioneer Village, on Wednesday, March 23th
- preliminary arrangements were underway for the Authority's Sugaring Off
Party, for members ann staff, to be held at the Kortright Centre, on
Saturday, Apri 1 9th
Special Programs
- staff attended the launching of the Sesquicentennial at the King Edward
Hotel, on Monday, March 28th
- staff spent extensive time working with the Foundation on the Annual
Report ann the special fund-raising campaign for the Visitors Centre
AudiO-Visual Highliqhts
- sline show for presentation at the 27th Annual Inaugural Meeting
- the Watershed Pl.an audio-visual presentation was set up and shown on a
number of occasions during the first three months, including the
Information Seminar for new members, on Tuesday, February 22nd Staff also
soent consioerable time on an audio-visual presentation on the 1983 buoget,
shown to new members on the same date
- audio-visual presentation on the Authority's budget was prepared and shown
at t~e Budget Meeting, on February 25th
B-16l
- 2 -
COMMUNITY RELATION~ - INFORMATION - RESOURCE MANAGEMENT
Printing Highlights:
- revisions have been complete~ for both the Valley and Stream Regulations
and the Waterfront Regulations and French translations are now available.
Printing will be completed by the end of April.
_ staff members are preparing a synopsis of the Environmentally Significant
Areas. This publication will eventually be available to those interested
in the Study.
COMMUNITY RELATIONS - INFORMATION - PLANNING/MARKETING
Printing Hiqhlig~ts:
_ slight revisions were maoe to the Black Creek Pioneer Village brochure
and 250,000 copies ~ave been printed. Distribution is underway.
_ the artwork for the new Conservation Area map was completed at the
conclusion of 1982. The design was developed, tn January, for side 2.
Staff spent considerable time on the written material and in the
selection of the photographs. The map has been printed (75,000 copies)
and distribution will commence in April.
_ the Black Creek Pioneer Village Walkaround Tabloid was updated ann will
be rea~y for printing in April
- the posters promoting Black Creek, Kortright and the Conservation Areas
have proven to be very popular, as distribution continues throughout the
watershed. Mr. Willis Blair, Chairman of the Liquor Licence Board of
Ontario, recently approved a program to display the Black Creek poster
in all the Metropolitan Toronto stores during the month of July, and
the Kortright poster during September.
_ Brochures Unlimiten has been contracted to distribute the Black Creek,
Kortright ann Conservation Area brochures throughout the Metropolitan
Toronto region, as well as throughout the Niagara Penn insula in the
case of the Black Creek and Kortright brochures
- preliminary work has been completed for an enclosure that will be sent
out with the City of North York's water bills, commencing in Hay, for
the next 26 weeks (200,000 copies)
- a number of other municipalities have shown interest in participating
in the same type of program
- staff prepared and distrlbute~ 12 news releases, 6 photo releases, 12
synopses and 12 fIvers, i~entifying and promoting programs at the Village,
Kortright and the Conservation Areas
- staff designed a Black Creek Pioneer Village promotion that will be
imprinted on Miracle Food Mart grocery bags. Distribution will take place
during the second and third weeks of May.
- the Authority subscribes to the MacLean Hunter Press Clipping Service and,
for the first three months of the year, received approximate~y 720
press clips, which is only a sample of the coverage the Authority receives.
A survey was done on the Toronto Star clippings for 1982 and it was
estimated that if the publicity given to this Authority had been paid
advertising, the cost would have been in excess of $540,000.
Special Programs
- a special exhibit of the works of Glen Loates was arranged at the Kortright
Centre, between February 4th and March 6th. This program was made possible
with the cooperation of the Ministry of Natural Resources. Staff worked on
publicity, program and a special Minister's reception which took place on
Thursday, February 3rd
- arrangements were also ma~e for an exhibit of the works of Frank de Matteis
at Kortright. This wildlife art show was on display between March 11th and
APril 4t~. A pUblic/media reception was held on Thursday, March 10th.
B-162
- 3 -
- numerous opportunities have come up this year, for the Authority to
part icipa te in special coupon discounting for admi ttance to Black Creek -
Dominion Stores, Holiday Inns, Travel Marketing Promotions, Federal Off i ce
of Tourism ann the City of North York (also includes Kortright)
- staff. attends regular meetings of the Attractions Council of the
Metropolitan Toronto Convenrion and Visitors Association
- staff worked with Harry McDougall of the Toronto Star, with respect to
special articles featuring Kortright, Black Creek and Bruce's Mill
- considerable work went into ~eveJoping the Communications Strategy for the
1983 Marketing Plan
- all of the Recommennations for Immediate Action and Short-term Action, as
recommend en in the Woods Gordon Marketing Plan, have been carried out,
ei tner completely or in pa r t
- initiaten a telephone answering sales program on evenings, weekends and
holidays This is a staff operated telephone answering service that was
implementer:l on March lqth, for a trial period of three months
- Teleguide units have been in place at Black Creek Pioneer Village since
October The units will be installed shortly at Kortright and Indian Line
Tourist ~ampground The Authority has 15 pages of information on tne
system and there are presently 290 units in the Metropolitan Toronto
region
- tne Canada/Ontario Employment Development Program will provide for
supplementary marketing activities, including distribution of literature,
staffing of exhibits and information booths and monitoring visitor trends
- the multilingual television sration, Channel 47, will be running a
13-week promotion on the Authority's recreational facilities, beginning
in early June
- the word processing equipment is now ready for use in the Conservation
Information Section
Aunio-Visual Highlights
- a new 60-'second, colour, television spot announcement, on the artisans at
BJark Creek Pioneer Village, is nearing completion This will be
distributen to Ontario's television stations in June
- winter ann spring television promotions were sent to all the Southern
On t a ri 0 television stations, promoting Black Creek, Kortright and the
Conservation Areas
- arrangements were made and exhibits were set up at the Camping on Wheels
show and the Canadian National Sportsmen's Snow
Advertisinq and Promotion
- arranged for special publ iei ty features with
a) Ontario Crafts Council - 0ntario Craft Magazine
b) Feneration of Ontario Naturalists - Seasons
c) Canada Century Home
d) Canada's Wonderland - Around Canada's Wonderland
e) Region of York - York Region Travel Guide
f) Metropolitan Toronto Convention and Visitors Association -
Happenings, Guide Map, Discovery Guide
CONSERVATION EDUCATION SECTION
Kortright Centre for Conservation
- attendance for the first quarter of 1983 was 23,700 visitors, up 2,000
from the same period of 1982
- during this quarter two well known wildlife artists (Glen Loates and Frank
de Matteis) held very successful exhibitions of their works in the Centre
- there was a wide variety of programs attractive to all ages and interests,
including Winter Wildlife, Owl Prowls, Maple Syrup Demonstrations, Nature
Photography, "Snow Snakes", Man and Wildlife Habitat, Ground Hog Day and
Workshops for Building Bird Houses and for Making and Flying Kites
4
B-163
- 4 -
- some of the special events taking place at the Centre were several
professional Development Day programs for teachers, an Ontario Professio~al
Forestry Association dinner, a M N R. luncheon, meetings of the Boy Scouts
Association, the Cancer Society, the Bindertwine Association, an APEO
rabies seminar and a special evening program for Kortright members
- thanks to a variety of government sponsored labour-intensive programs and
funds raised by the Foundation and from ~arious Ministries, several develop-
ment projects will be completed this year Forestry Trail, Land Theme
Building, Fisheries Project, Water Theme Exhibit Area, plan and design for
the exhibit and trail program, seating for the theatre
- in addition, Kortright's participation in the C O.E.D. program will provide
labour and materials to complete the gatehouse, enlarge the bee space,
carry out major repairs to the barn, cultivate and plant several fields in
conjunction with the Land Theme program, and upgrade the Centre to the
required maintenance level, as well as several other smaller projects
- the Renewable Energy Theme is well underway, with the detailed plan of
outdoor development expected to be completed in May and an official opening
of the entire program scheduled on arrival of the windmill (currently
being tested in Prince Edward Island); the audio visual component of the
energy program has also been acquired and is in place, and the indo9r exhibit
component is well underway
- the Landplan Collaborative Ltd. is making the final adjustments to its plan
of the central core area, with implementation expected to be started in the
first half of this year - includes an extension to the present indoor
eating facilities, an enclosed patio eating area, additional parking space
and an activity/playground/holding area in conjunction with the student
group programs
Day Programs
- in addition to resource management programs at Cold Creek, a resource
planning project-type program is almost ready for marketing to school
groups, along with rifle/trap/archery range programs which are being
updated and reorganized - all in-depth programs for intermediate and senior
students
- at Black Creek Pioneer Village, the Pioneer Life Program continues to be
just as much in demand as ever; the Tour Programs are getting underway for
the spring season; plans are well along for a-"summer discovery" program
in cooperation with York university, during weekday afternoons in July
- the Maple Syrup Program at Bruce's Mill was again fully booked this year,
with students largely from the primary and junior grade level; the staff
is studying the possibility of relocating the trail and some of the
demonstrations, with the assistance of the C ..0 E. D program
Residential Programs
- despite decreasing enrolment and less demand for weekend use on the part of
the schools, the Centres are still maintaining their 90% occupancy due to
other types of groups making use of the facilities
- among the special groups using the Centres were a multi-cultural group of
Etobicoke senior students, a variety of church and youth groups, the Bruce
Trail Association, Peel Regional Police Leadership Forum, several groups of
guides and brownies, a number of private school and college groups and groups
from the Metro Toronto Schools for the retarded
- several in-house and Authority related committee meetings and staff seminars
were held at the various Centres
- Faculty of Education, University of Toronto continues to participate in the
programs for practice teaching purposes
- the C O.E.D program will provide labour and materials for renovation of
the dormitory, partial renovation of the kitchen and the addition of a mud
room, plus several other smaller projects, at the Albion Hills Conservation
Field Centre; and for barn renovations, pedestrian walkways and landscaping,
kitchen expansion, construction of decks on the dormitories, dock and beach
centre, and several other projects at the Lake St. George Conservation Field
Centre
.5.
B-164 - 5 -
Lease-Agreement between
The Etobicoke Board of Education and The Metropolitan Toronto and Region
Conservation Authority
- a "signing ceremony" was held at Black Creek Pioneer Village on
Wednesday, March 23, 1983, to formally announce the Lease-Agreement
between The Board of Education for the Borough of Etobicoke and The
Metrolopitan Toronto and Region Conservation Authority, to construct
a residential centre for the Board, in conjunction with the Authority's
Albion Hills Conservation Field Centre
The new centre (Etobicoke Environmental Education Centre) will accommodate
about 70 students and accompanying staff, and will be used primarily by the
Board's Grade 6 students on a year-round basis
Construction is to begin almost immediately, with completion scheduled for
the end of 1983
FINANCIAL COMMENTS
All expenditures and revenues appear to be on target
While it is not reported on the attached financial summary, the 1983 budget
for the Renewable Energy Program at Kortright is $183,493, of which $33,173
has been spent to-date (18%) and $150,320 is available to the end of the
current agreement between the Authority and the Ministry of Natural Resources
(March of 1984)
TEB/mrp
1983 04 26
BY PROGHAM .....1".__ _.".,.,,,_ ______
J
E X PEN D I T U RES REV E N U E
=~~;=~==~~~===~~~~==~=~=~ ====;=~;===-== ====;~=====; ~~==~~====~m=cc===~~==~=======~~=~~=>>~=
/1-T-D Y-T-D 1{ FUNDS I1-T-D Y-T-D 1{
BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTU~L ~ECD i
==~;:== =-;;;=-==:;s: =~=z::;o;::;.. ",r", =:a;;=cz:;l=C==: C;:~===III C:=ClIi:U::lIiI3: ;;;:==::U:IIG ;:::;=:=
INFORMATION ~ EDUCATION
=====;~~c======_=======
ADMINISTRATION - I & E 415.370 32.787 92.318 22 2 323.052 415.370 0
COMMUNITY RELATIONS - INFORMA 80. 127 232 4.431 5 5 75.696 BO. 127 0
--
COMMUNITY RELATIONS - INFORMA 1 L 000 0 11. 000 11 . 000 0
COMMUNITY RELATIONS - INFORMA 90.243 2.313 9.772 10 8 80.471 90.243 0
FIELD CENTRE - OPERATIONS 1.273.083 99.564 241.573 19 0 1.031.510 1. 266.0B3 74! ~7~- 233. 182- 18 4
- - ---
KORTRIGIH 442.000 42.920 11 L 400 2~ 2 330.600 441.384 ~1,890- 79. B02- IB 1
CONSERVATION EDUCATION-DEVELO 0 92.500 0
.-----. - - -.
-------.--------.-- -------- ---------- ----~----------- ---------------------------------------
TOTAL 2.311.823 177,816 459,494 19.9 1,852,329 2.396.707 126,563 312.984- 13 5
---------------- ------- ---------- ---------------- ---------------------------------------
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL
.- ------- - --- .- -- ----.. ._-
KORTRIGHT - RENEWABLE
ENERGY PROGRAM 183,493 33,173 150,320
-- - --------.-----"-
- .- ------ .-
W
I
r-
(J\
II>
___0. -- - - -- - ----------------
"--- ----- ------
B-166
TO The Chairman and Members of the Executive Committee, M T R C A
- Meeting #6/83
FRDM P B Flood, Administrator
Conservation Land Management Division
RE Conservation Land Management Division
PROGRESS REPORT
-----------------------------------------------------------------------
PROGRAM ADMINISTRATION
The primary use of administrative staff during the early part of this year
has been in continuing existing and developing new employment programs
During the past year, the division has received considerable assistance for
various programs through 12 individual Provincial and Federal Government
special employment programs The variety of programs and the works
accomplished are indicated in the various programs of the Division The
largest single project presently underway, the COED (Canada Ontario
Employment Development) program will provide the Division with approximately
$820,000 to hire 57 employees in a variety of jobs for a period of up to 52
weeks
WATERSHED RECREATION - PLANNING
The planning priority for 1983 is the Boyd Master Planning Study To date
Phase I and part of Phase II of the planning process have been completed
On February 17, the Authority hosted an information centre to provide the
general public, interest groups and government agencies with an opportunity
to review and comment on the progress and direction of the study This was
a very successful meeting with well over 80 people in attendance
At the present time, the study team is evaluating the economic,
environmental and technical feasibility of a number of development ideas for
the Area When this analysis is complete, alternative concept plans will be
prepared These plans will be presented to the public at a second open
house sometime late in May
In addition to the Boyd Study, staff has been involved in reviewing and
finalizing plans and specifications for this year's major development
projects the Albion Hills washroom building and picnic shelter and the
Indian Line campground supervisor's residence and laundramat This
information is to be forwarded to the Minister for technical approval late
in April Tender documents are currently being prepared
A draftsperson has been hired under the COED program to assist with the
preparation of technical drawings for the major maintenance projects to be
carried out in 1983 Two such plans have been completed
After several meetings to discuss the impacts of the proposed Highway 50
realignment on the Claireville Area, MTC has agreed to pay the Authority, in
addition to a property settlement, $40,000 to buffer plant the affected
area
WATERSHED RECREATION - DEVELOPMENT
The two year program to assist disabled persons visiting Conservation Areas
and Forest and Wildlife Areas ended March 31 Projects completed in 1983 at
a total cost of $13,170 included installation of unistone pathways into
and around the trap range building at Cold Creek, construction of a drop off
area and path system to the Beach area at Bruce's Mill, improved parking at
both of the above Areas and provision of exterior shower facilities in the
pool area at Petticoat Creek
Work on the new entrance road into the Indian Line Campground continued in
1983 MTC is scheduled to complete the paving contract for this
intersection on or before May 15 Under the COED program, the Authority
will extend road curbs to the turning circle, install a unistone pathway
around the proposed supervisor's residence and gatehouse and replace
landscape plantings lost as a result of the Finch Avenue extension
B-l67
PR06RESS REPORT
PAGE 2
The COED program will also provide labour and materials to
- repair the rifle range building at Cold Creek and the refreshment
booths at Greenwood and Claireville;
- construct a new fish rearing pond at Glen Haffy and office space and
refreshment facilities at Cold Creek, and
- replace the footings/piers under the grist mill at Bruce's Mill
Already people have been hired to upgrade and standardize the signage in all
areas as well as paint the exterior and interiors of a number of Authority
buildings.
A proposal has also been submitted under the Provincial Parks and
Conservation Areas Work Sector program If approved, this program will
enable the Authority to develop an equestrian/snowmobile trail at
Claireville and carry out further restoration work on the grist mill at
Bruce's Hill.
WATERSHED RECREATION - OPERATIONS
During the first quarter of 1983, the usual 6 Conservation and 2 Forest and
Wildlife Areas were open for public use Due to the abnormal lack of snow
normal winter recreation activities were not possible The Albion Hills and
Bruce's Mill ski programs were able to offer limited facilities on 3 and 2
weekends respectively Only 5 groups at Albion Hills and 2 groups at
Bruce's Mill were able to participate in the instructional program. In an
effort to reduce costs ski staff were released early None of the scheduled
winter Special Events were held
The monthly Retriever Trials commenced in March at both Claireville and Cold
Creek. The Bruce's Mill Maple Syrup Demonstration began the first weekend
of March, a week earlier than usual. Bookings for the school tour program
increase~ over previous years with tours commencing mid-March Staff are
undertaking a complete review of the Demonstration program for both public
and school tours as well as the physical layout to ensure that it is up to
date with current industry trends.
During January, the annual delivery of Q5,000 Rainbow Trout fry was received
at the Glen Haffy hatchery This fish will provide the "Put and Take"
stocking supply for the Glen Haff~ ponds, Heart Lake and other Areas in
198Q
The lack of winter recreation activity permitted Area staff to carry out
more than the usual amount of routine maintenance and repairs to buildings,
grounds and facilities This work was augmented by 2 Special Employment
programs At Bruce's Hill, 2 young workers were employed under the Winter
Experience Program to assist with maintenance and program preparations At
Claireville/Heart Lake and Boyd Areas, 2 3-man crews started work under the
1983 Canada Community Development Program (CCDP) These workers assisted
with building and picnic table cleaning and painting and also accomplished
considerable landscape tree pruning in picnic areas This program will
continue throughout the summer and will be expanded to other Areas
Under the Authority's COED program, 10 workers have been identified to
assist Conservation Area staff with regular operations and maintenance.
These additional workers will assist in upgrading maintenance standards to
levels in previous years A crew of 3 workers is being provided to work at
Indian Line Campground to carry out new planting and to maintain all
plantings They will also assist in all ground maintenance work at the
campground
At Cold Creek, 23 people attended the first Hunter Education Course
conducted by the Area Superintendent In response to demand, section staff,
in consultation with I&E Division staff, have begun work on revamping the
Shooting Skills Program for school groups
B168
PROGRESS REPORT
PAGE 3
During this period, Sporting Clubs have used the ranges for 2 "Ham
Shoot" competitions A permit has been issued to the Upper Canada
Rifle Association for a monthly event on the rifle range The
Superintendent and other section staff have been actively involved
in preparing for a summer special Event Day and a major Dog Show in
October
The Superintendent has participated in a radio interview and brochure
distribution to sports stroes to promote the Area
During the winter, Petticoat Creek staff have again carried out the
annual inventory of all Authority vehicles and equipment and the
annual inventory for the Land Management Division of all Area tools,
equipment and furnishings Division staff have devoted considerable
time to preparation and processing of Tenders for the Authority's
acquisition of replacement vehicles, tractors and equipment
During this period, Division staff organized a training seminar on
Chainsaw maintenance and safe "felling" techniques This program
sponsored by the Ontario Pulp and Paper Makers Safety Association
was attended by staff from various Authority locations and has been
very favourably received by all attending It is a valuable addition
to the Authority safety program A tractor maintenance seminar
sponsored by the Ford Motor Company was held for operating staff
involved in tractor operation Two Conservation Area supervisors
and the Safety Officer attended the MNR Enforcement Course and
successfully passed the test requirements They will be eligible
for future appointment as Provincial Offences Officers to enforce
the Authority's Conservation Area Regulations
Division staff have been actively involved in promoting Area recreation
facilities by staffing displays at the Camping on Wheels and the Canadian
National Sportsmens Shows Emphasis in both displays was on
Conservation Area recreation facilities Revisions have been completed
and updated information pamphlets printed for campground operations,
boating programs and range operation Copy for the individual Area
brochures has been revised in preparation for printing for Spring
distribution Considerable input was provided by Division staff
into the preparation of the new "Conservation Areas Brochure"
In preparation for the upcoming summer, staff hiring is well underway
The new public boating program for Heart Lake has been established
and staff are reviewing a request for a sail boarding concession
The Claireville canoe instruction program has been revised to reduce
operating costs
The following table shows Area attendance for the period January
3 to March 27, 1983 It shows a decrease of 66,864 people or 64 2%
over the same period in 1982 reflecting the serious impact of the
lack of snow on Area operations
ATTENDANCE AT CONSERVATION AREAS, JANUARY TO MARCH 1983
1983 1982
ALBION HILLS 6,195 38,333
BOYD 3,071 6,905
BRUCE'S MILL 13,813 25,479
CLAIREVILLE 4,886 6,094
COLD CREEK 6,086 6,240
GREENWOOD 1,691 6,155
HEART LAKE 709 3,758
PALGRAVE ~ 9,509
37,205 104,069
PROGRESS REPORT B-16g
PAGE 4
CONSERVATION LAND MANAGEMENT PROGRAM
Job creation programs funded by the Federal and Provincial Governments
have enabled the Authority to accelerate resource management projects
on Authority, public and privately owned lands within the watershed
On Authority owned lands, staff hired under the Canada Community
Development Program and the Parks Work Sector Program carried out
woodlot and plantation management programs in the following locations
Bolton Resource Management Tract (201 cU.m /56 cords of firewood),
Glen Haffy Forest and Wildlife Area (432 cu m./120 cords of pulpwood
and 1600 meters of fireguard maintenance); Glen Major Resource
Management Tract (1500 meters of firegaurd development). The Bruce's
Mill Conservation Area produced 45 cu.m./12 cords of firewood this
past winter. As part of the COED program, 5 staff will continue
woodlot and plantation management on Authority lands starting in
early May.
Under the Fisheries Work Sector Program, which started in the fall
of 1982, staff developed and posted 8 km. of fishing trails in the
Bolton Resource Management Tract and 4 km in the Claremont Forest
and Wildlife Area. Six fishing piers were also constructed for the
Claireville Conservation Area. Additional stream improvement projects
for 1983 include 540m of fisheries rehabilitation on the Duffin Creek
and 800m on the Humber River.
The Authority will be involved in the Experience '83 Conservation
Services Sub-Program again this year and it is anticipated that 400m
of stream improvement works will be initiated on the Humber River
The Authority will also be working with Save Our Streams, an
organization which is interested in conducting fisheries projects
on Authority lands. To date, one major proposal hs been received
for works on the Duffin Creek in the Claremont Forest and Wildlife
Area.
Reforestation projects are underway on Authority lands with 50,000 .
seedlings scheduled for the Glen Major Resource Management Tract,
6,000 at the Palgrave Forest and Wildlife Area, and 14,000 for the
Lake St George Forest and Wildlife Area Boy Scout groups will
also be planting 10,000 seedlings at the Bolton Resource Management
Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd
Conservation Area, and 10,000 at the Glen Major Resource Management
Tract
Planning projects for resource management programs on Authority owned
lands have included the completion of fire suppression plans for
plantations in Goodwood and Glen Major Resource Management Tracts,
and the Claremont and Greenwood Forest and Wildlife Areas Forest
management plans are being prepared for the Albion Hills Conservation
Area, Palgrave Forest and Wildlife Area and the Glen Major Resource
Management Tract
Under the Forestry Stimulation Work Sector Program, plantation
management projects will be undertaken later in the year at the Glen
Major and Goodwood Resource Management Tracts and the Claremont Forest
and Wildlife Area Management Plans have been completed for the
Bolton, Nashville, Ebenezer and Glen Major Resource Management Tracts
Resource management plan preparation will continue throughout 1983
for Resource Management Tracts, Forest and Wildlife Areas and
Conservation Areas
These plans will also include Environmentally Significant Area
management plans .
A stream report summary has been completed which identified the success
of stream improvement projects carried out since the program began
in 1962 Since that time, 34,000 meters of stream have been improved
In addition, stream assessment projects and monitoring programs will
be carried out under the COED program in 1983
Agricultural rental reviews have been carried out on five Authority lands
to date in 1983
B-170 PROGRESS REPORT
PAGE 5
Under the 1983 Parks Work Sector program, fencing projects have been
proposed for a number of Conservation Areas and Resource Management
Tracts The approval of the Parks program is pending
Staff are also working with Ducks Unlimited to determine the
feasibility of developing waterfowl habitats at the mouth of the
Duffin Creek and in the headwaters of the Humber River
Under the Private Lands Assistance Programs, 63 site visits have
been carried out to date to provide technical advice on tree planting
programs', pond advice and urban wildlife
Tree planting programs are underway and approximately 30,000
reforestation trees will be planted for 12 private landowners this
spring 13,500 wildlife shrubs and 2,500 trees will be planted under
the Urban Wildlife and Tree and Shrub Planting Programs for 44
landowners Two requests have been received for reforestation
subsidies (4,000 trees) One Conservation Plan has been completed
with four applications on file To date, 34 Conservation Plans have
been completed for private landowners Two requests are on file
for the Authority tree spade rental program this spring The tree
spade is also busy again this spring preparing caliper tree stock
for landscape projects
Planning activities for private lands programs include continuing
inventory of past assistance programs, a land use review of major
watersheds to priorize project locations throughout the watershed
and a coninued agriculture land use review
A new program of ESA management for private landowners will be
finalized during 1983
Promotion for Services Programs has included to date the circulation
to cable T V outlets a video tape of the Conservation Services slide
presentation and news releases for various assistance programs
A slide presentation on the Density Bonus program will be completed
in the near future Staff will be participating in landowner days
at the Kortright Centre
Inventories have been completed for 90% of the primary and seconda.ry
watercourses within Metro Toronto and surrounding municipalities under
the Winter Experience programs for the Authority's new Urban Management
program Three planting projects are underway for the Rouge and
.- Highland Creeks and the Don River Two hundred and ninety-five trees
and 1,300 wildlife shrubs will be planted Plantings will also be
carried out for the City of Brampton with 4,450 seedlings, 100 trees
and 1390 shrubs being established Six additional sites are scheduled
for the fall under the COED program Also under the COED program,
ESA management plans will be developed for sites in urban areas
Landscape projects and tree maintenance will be carried out by
Conservation Services staff along with COED employees on a number
of Waterfront development projects which include Humber Bay West,
Ajax Waterfront Area, Bluffers East and Marie Curtis A total of
510 caliper trees and 4,500 shrubs will be planted and major
hydro seeding projects will be undertaken
..
Site rehabilitation will continue at the South Thackeray Sanitary
Landfill Site in conjunction with an intensive tree maintenance
program Landscape projects are also scheduled for the Bo 1 ton
Channelization project, Frenchman's Ba y and two yacht clubs utilizing
waterfront parks (Bluffers, Humber Bay East)
The Authority nursery program will be supplying trees and shrubs
to the various tree planting and landscape projects as well as to
the Flood Control Section, MNR, South Lake Simcoe, and Kawartha Lakes
Conservtion Authorities and Save Our Streams Under the COED program,
staff will be hired to accelerate the production of plant material
used on job creation projects
8-171
PROGRESS REPORT
PAGE 6
FINANCIAL STATEMENT
YR TO DATE ~ BUDGET
EXPENDITURES EXPENDITURES BUDGET USED
Administration 1611,105 673,2011 211 4
Watershed Recreation Planning 2,056 75,000 2 7
Conservation Area
Development 13,171 181,960 7 2
Operations & Maintenance 426,458 2,149,000 19 8
Conservation Land
Management Planning 24,1197 118,800 211 9
Conservation Management 50,385- 309,181 16 3
Fish Rearing 722 10,500 7 0
Operations - Non-Revenue 8,321 32,000 26 0
REC'D TO % BUDGET
REVENUES 1982 BUDGET DATE REC'D
Operations & Maintenance 1,016,000 69,372 6 8
Conservation Management 134,000 70 -
FINANCIAL COMMENTS
PLANNING ~ DEVELOPMENT
The Boyd Master Planning Study is on schedule and within budget
The Access for Disabled Program was under spent due to weather conditions
and actual costs for the Petticoat Creek shower facility which were less
than originally budgeted
Work on the two major development projects has not begun pending technical
approval from Ministry of Natural Resources
CONSERVATION AREA OPERATIONS
The lack of winter activity resulted in approximately $92,000 less revenue
than anticipated during the first quarter Operating costs were however
reduced by a similar amount due to lower utility and road maintenance costs
and the employment of fewer supplementary staff
CONSERVATION LAND MANAGEMENT
Land Management programs for private lands assistance programs are now
underway and revenues anticipated from these programs will be reflected
in the next quarter Expenditures for all programs are in line for this
time of year
~ B-l72
V
the metropolitan toronto and region conservation authority
mi'nutes
EXECUTIVE COMMITTEE l6-MAY-1983 REPORT .7/83
(~l)1:''''Tll.r M1i!~"'TMt.!~
PRESENT'
Chairman Mrs. F. E . Ge 11
Vice-Chairman E.V. Kolb
Members W.G. Barber
M.W.H. Biggar
Mrs. L. Hancey
H.C. Lawrie
Ms. S. Nimmo
J.S. Scott
Mrs. N. Stoner
Authority Member W.R. Herridge, Q.C.
" II- Dr.. W.M. Tovell
Chairman - Metropolitan Toronto P V Godfrey
Chief Administrative Officer, Metro. Toronto J.P. Kruger
Chairman - Peel Region R. F'. Bean
Chairman - York Region Bob Forhan
Chairman - Durham Region G. Herrama
Asst. Deputy Minister, M.R.N. R.J. Burgar.
Acting General Manager, M.T.R.C.A. W.A. McLean
Secretary-Treasurer. " W.E. Jones
ABSENT
Members. . E. Fulton
S.A. Macpherson
A special meeting of th& Executive Committee was convened on Monday-l6-May-1983,
commencing at 3:30 p.m. The meeting was. summoned by t;he' Chairman pursuant to
Sect ion 8, sub-sections (3) and (4) of the Regulations made by The Metropolitan
Toronto and Region Conservation' Authority and adopte<i by Resolution t88/75.
Pursuant to Section 9 of the said Regulation, the following matters were
discussed:
The mandate of' the Authority, specifically its role and its function in
relationship to its constituent municipalities and the Province of
Ontario;
.Its role in regard to flood control, education, and recreation;
. The capaci ty of the. administration to respond to its mandate, particularly
in regard to its' relationship with the. Authority and the. Executive
Committee;
.The relationship. of the Executive Committee to, the' Authority at large;
.The' possibility of a more formal and thorough review and examination of
the above topics.
No resolution was adopted; however, there was, basic agreement that a review be
requested, that a' steering committee be appointed, and'. that the. steering
commi ttee' draw up terms: of refer.ence for the review.: these matters' to be
considered' by the Executive Committee at Lts regular meeting:; scheduled for
Wadnesday-18-May-1983.
The meeting terminated at 5 35 pm., 16 May
Florence Gell W.E.. Jones
Cha'l rman Secretary-Treasurer
WEJ/KC'
~.
, B-173
the metropolitan toronto and region conservation authority
minutes REPORT .8/R 1
EXECUTIVE COMMITTEE lB-MAY-1983 t8/B3
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, la-May-19B3.
PRESENT
Chairman Mrs. I!'.E. Gell
Vice-Chairman E.V. Kolb
Members W.G. Barber
M.W.H. Biggar
E. Fulton
Mrs. L. Rancey
H.C. Lawrie
(E'or S.A. Macpherson) E'.J.. McKechnie
Ms.. S. Nimmo
J .S., Scott
Mrs. N. Stoner
Authority Members R.J. Crowe
Dr. W.M. Tovell
ABSENT'
Member S.A. Macpherson
MINUTES
Res. H13 Moved by: Mrs. N. Stoner
Seconded by: Mrs-. L. Hancey
THAT the Minutes of Meeting i6/83 be approved;
AND E'URTHER THAT Report t7/83, a report of a special meeting of the Executive
Committee, held Monday-16-May-l9a3, be received.
CARRIED.
SEC'l'ION I
ITEMS E'OR CONSIDERATION-
1- AUTHORITY MANDATE AND ORGANI~ATION
-Review
Res_ U14 Moved by:' E'. V. Kolb-.
Seconded by: Mrs. L. Hancey
WHEREAS the- Executive Comm'ittee- has giverr consideration' to the- work of the.
A:uthority and its: relationship with it~ member' munlcipa-lities.: and the-
provinc~ of Ontario;
AND WHEREAS it is essential that there be strong agreement among the
Authority, i t8 member municipalities, and th~ ~ovince of Ontario on the
direction- in which- the Authority is' proceeding;,
BE IT: RESOLVED' THAT the Executi va Commi ttee recommend ta- the' Authori ty that
a review- of the Authority's, mandata' and organization' be undertaken and, in
this connection, that the following action- be- taken:,
THAT the Chairman and Vice-Chairman consult with the Minister of Natural
Resources and the- Chairmen of The Municipality of Me,tropoli tan Toron'tO' and
The Regional Municipa'l,lties: of York, Peel", and, Durham, on. the termS' of
reference for the review, the: constitution,. and function- of a Steering
Committee far' the review.
CARRIED,.
B-174 -2-
SECTION II
ITEMS FOR INFORMATION
2. CORRESPONDENCE
Mr W A McLean, Acting General Manager, reported receipt of the following
correspondence
(a) Letter dated May 5, 1983, from J T Johnston, Regional Manager,
Ministry of Tourism & Recreation, enclosing certificates of
participation for Messrs T E Barber, R K. Cooper, and P B Flood in a
recent Ministry-sponsored Senior Management Institute. Appreciation was
expressed by Mr Johnston for the high calibre of the Authority's
participants
(b) Notice from The Association of Conservation Authorities of Ontario of
The 1983 Conservation Authorities Tour to be held September 18-21 in
Thunder Bay The Lakehead Region Conservation Authority must be
noti fied of attendance no later than June 30
The Chairman requested that members wishing to attend contact
Mr McLean
(c) Letter dated May 11, 1983, to Central Region Conservation Authorities
confirming telephone notification that" effective immediately, a
temporary freeze has been placed on the award of all contracts in the
capital and surveys and studies categories of Conservation Authorities'
budgets This freeze will remain in effect from May 10, 1983 until May
27, 1983 inclusive unless otherwise notified . .this temporary freeze
is necessary in anticipation of a funding constraint which is to be an-
nounced shortly Contract awards which were not made prior to May 10,
1983 should no t be finalized during the above temporary freeze period "
(d) Letter dated April 29, 1983, from C.W Lundy, A.M C.T , Durham
Regional Clerk, having regard to the Black Creek Pioneer Village
Visitor Centre, advi sing that at a meeting held April 27, 1983, Council
adopted the following recommendation of the Finance Committeee
"THAT the amount of $11,461.36 be deleted from the Metropolitan Toronto
and Region Conservation Authority 1983 budget and that the Authori ty be
advised of the Regional Policy with respect to grants. "
The policy referred to is to not make payment of grants in any form
except for statutory grants.
(e) Letter from Keith C Norton, Minister of the Environment, accepting the
Authority's withdrawal of Class EAs on Erosion and Sediment Control and
On Site Flood Control, and expressing his support of its decision to
amalgamate its efforts with those of The Association of Conservation
Authorities of Ontario
(f) Letter from the W Peechatka, Executive vice-president of the So il
Conservation Society of America, concerning the Society's 38th Annual
Meeting to be held July 3l-August 3 at the parkview Hilton Hotel in
Hartford, Connecticut
Members interested in attending were requested to contact Mr McLean
3 PERSONNEL
Res HIS Moved by E. V Kolb
Seconded by M W.H Biggar
THAT discussion of a certain personnel matter be held in camera.
CARRIED
The Committee had before it a letter from Mr K G Higgs, stating tha t he is
dissatisfied with the arrangements made for him in accordance with Executive
Resolution #93/83
The Executive sought the advice of legal counsel, Mr John B Conlin, Q.C ,
who attended the meeting
-3- B-17s
Res B16 Moved by Mrs L Hancey
Seconded by M.W H Biggar
THAT the arrangements made for Mr K G Higgs in accordance with Executive
Resolution #93/83 be reaffirmed;
AND FURTHER THAT the Chairman be instructed to acknowledge the letter of
Mr Higgs and to respond to him, inviting him to appear before the Executive
Committee as soon as convenient after his discharge from hospital
CARRIED
4 #527 & #531 RODD AVENUE, TOWN OF PICKERING
MRS STONER introduced the following recommendation which was before Council of
The Regional Municipality of Durham on May 11, 1983, but was deferred pending
consideration of this Committee MR ALEX ROBERTSON represented Regional
Council
"AGREEMENT WITH THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
FOR USE OF 527 AND 531 RODD AVENUE, TOWN OF PICKERING (GEN.-9/83)
RECOMMENDATION TO COUNCIL
THAT property Management be advised that we do not wish to enter into any
agreement with the Metropolitan Toronto and Region Conservation Authority
for the use of the properties municipally known as numbers 527 and 531 Rodd
Avenue in the Town of pickering at the proposed rental charge of $500 per
month and that an extension to the present agreement be requested to provide
for a 60-day notice to the tenants "
Res #117 Moved by Mrs N Stoner
Seconded by J S Scott
THAT appropriate Authority officials attempt to negotiate a rental agreement
for the properties municipally known as numbers 527 and 531 Rodd Avenue,
Town of Pickering, and report back to this Committee;
AND FURTHER THAT the existing agreement be extended until completion of
negotiations
CARRIED
5 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
,
Res H18 Moved by M W H Biggar
Seconded by W G Barber
THAT the applications listed herein as A (1) to A(4) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
A(l) E P Seagram Industries Limited
To build gabion retaining wall and place fill , western side slope
Berczy Creek, Lot 19, Concession IV, Town of Markham (Rouge River
Watershed)
In accordance with the following documents and plans, which sha 11 form part
of the perm it
(a) project ItJ-24, Drawing #14, dated April 29, 1983, prepared by
Bunting Wardman Limited;
(b) Correspondence from Bunting Wardman Limited dated April 28, 1983
A (2) E P Seagram Industries Limited
To construct three drainage swales to the Berczy Creek, west of
Warden Avenue, north of Sixteenth Avenue, Part Lot 19, Conc IV,
Town of Markham (Rouge River Watershed)
In accordance with the following documents, which sha 11 form part of the
pe rm i t
(a) Project ItJ-24, Drawings #6 and 13, dated May 4, 1982, prepared
by Bunting Wardman Limited;
(b) Correspondence from Bunting Wardman Limited dated April 28, 1983
B-176 -4-
A(3) E. P. Seagram Industries Limited
To construct two drainage swales to small tributary of the Berczy
Creek, Part Lot 19, Conc IV, Town of Markham (Rouge River)
In accordance with the following documents and plans, which shall form
part of the perm it
Project #J-24, Drawings #5, 7, and 13, dated May 4, 1982,
prepared by Bunting Wardman Limited
A(4) Borough of Scarborough
To construct new inlet structure and safety grating, Dorset Park
Interceptor branch of the Highland Creek, Midland Avenue, south
of Lawrence Avenue
In accordance with the following documents and plans, which shall form
part of the perm i t
Drawing #4409-1, 4409-2, and 4409-3, prepared by the Borough of
Scarborough, and dated April, 1983.
6 PALGRA VE DAM, HUMBER RIVER WATERSHED
-Major Maintenance
Res. H19 Moved by Mrs L. Hancey
Seconded by H.C Lawrie
THAT the staff be authorized to retain the services of Cumming-Cockburn
& Associates Limited, at an estimated cost of $4,400 00, for the detailed
engineering in connection with repairs to the Palgrave Dam
CARRIED
7 DELLCREST CHILDREN'S CENTRE
-Occupancy of Authority-owned land #1651 Sheppard Avenue West,
Downsview Dells Park (Black
Creek)
Res. H2O Moved by Mrs L. Hancey
Seconded by H C. Lawrie
THAT the communication received from the Metropolitan Toronto Clerk and
dated April 27, 1983, concerning the occupancy of Authority-owned lands in
the Black Creek valley south of Sheppard Avenue, be received;
AND FURTHER THAT the Metropolitan Toronto Clerk be advised that the
Authority concurs with the recommendation adopted by the Council of
The Municipality of Metropolitan Toronto at its meeting held
April 26, 1983 .
CARRIED
8 TOWN OF MARKHAM
-Request for Authority-owned land former Unionville Planing Mill,
Town of Markham (Rouge River)
Res #121 Moved by Mrs L Hancey
Seconded by H.C. Lawrie
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Town of Markham to convey a small parcel of
Authority-owned land;
AND WHEREAS it is the opinion of the Authori ty that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with the
Town of Markham in this instance;
THAT a small parcel of Authority-owned land, containing 0.950 acres, more
or less, be conveyed to the Town of Markham; said land being Lot 1, Part of
Lot 2, Registered Plan 348, Town of Markham (The Regional Municipality of
York) Consideration to be the nominal sum of $2 00, and any other costs
involved in completing this transaction;
-5- B-l77
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 21 (c) of The Conservation Authorities Act, R S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and execution of any
documents
CARRIED
9 BOROUGH OF SCARBOROUGH
-property south of Lawrence Avenue East, Chesterton
Shores Area (Waterfront)
Res. U22 Moved by M.W H Biggar
Seconded by E V Kolb
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Borough of Scarborough to grant a permanent
easement across Authority-owned land required to faci li ta te storm drainge
in the Chesterton Shores Area;
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authori ty, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with the
Borough of Scarborough in this instance;
THAT a permanent easement, containing o 245 acres, more or less, be granted
to the Borough of Scarborough for storm drainage in the Chesterton Shores
area; said land being Part of Block 'G' , Registered Plan 275, Borough of
Scarborough (The Municipality of Metropolitan Toronto) , desigated as Part 3
on Plan 64R-9241 Consideration to be the nominal sum of $2 00, plus all
legal, survey and other costs;
THAT said grant of easement be subject to an Order-in-Council being issued
in accordance with Section 21(c) of the Conservation Authorities Act, R S 0
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
10 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT
-Property (a) Melvin & Mireille Freedman
(b) Joseph L & Violet C Womersley
(c) Albert 0 L & Bertha M Burnese
Res 1H23 Moved by M W H Biggar
Seconded by Mrs L Hancey
THAT the report (May 10, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchases
CARRIED
"Re Project Land Acquisition Project 1982-1984 Lake
Ontario Waterfront
Authority Executive Resolution #88, Meeting #4 -
April 8 , 1981, and Authori ty Resolution
B8, Meeting #3 - May IS, 1981
Subject property South side of Crescentwood Road
Owners (a) Melvin & Mireil1e Freedman
(b) Joseph L & Violet C Womersley
(c) Albert 0 L & Bertha M Burnese
Area to be acquired (a) 0 086 acres, more or less
(b) 0 116 acres, more or less
(c) 0 104 acres, more or less
Recommended purchase price Nominal consideration of $2 00 in each
instance, plus vendor's legal costs
B-178 -6-
"Included in the requirements for the above-noted project are 3 irregularly-
shaped parcels of land, being Part of Lots 1, 2, and 3, Plan M-5sl, Borough
of Scarborough (The Municipality of Metropolitan Toronto), located south of
Crescentwood Road, east of Warden Avenue.
"Negotiations have been conducted with the owners, and, subject to the
approval of your Committee, agreement has been reached with respect to
purchases as follows
The purchase price is to be the nominal consideration of $2 00,
with date of completing the transactions to be as soon as
possible.
"I recommend approval of these purchases, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchases. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"This property is being conveyed to the Authority in connection with certain
erosion control works being carried out along the Scarborough Bluffs.
"Funds are available for this acquisition - Account 0-04-13-401 - Hazard
Land Acquisition "
11. REPORT H/83 - INFORMATION & EDUCATION ADVISORY BOARD
Res H24 Moved by Ms. S. Nimmo
Seconded by Mrs. N. Stoner
THAT Report il/83 of the Information and Education Advisory Board, as
appended as Schedule nAil of these Minutes, be received;
AND FURTHER THAT the recommendations contained therein be approved.
CARRIED
12 KORTRIGHT CENTRE FOR CONSERVATION
-Sheltered Patio Eating Area Proposal
Res U2s Moved by Mrs. L Hancey
Seconded by Mrs N. Stoner
THAT the firm of Shore Tilbe Henschel Irwin Peters, Architects & Engineers,
be awarded the contract for preliminary design sketches, Code and
Engineering Review, for the sheltered patio eating area at the Kortright
Centre for Conservation, at a maximum fee of $1,000 00.
CARRIED
13 FINANCIAL REPORT AND ACCOUNTS
-Month End i ng Apr il 30, 1983
Res. 1126 Moved by E.V Kolb
Seconded by J S. Scott
THAT the Divisional Expenditure Summary for the period April l-Apr il 30,
1983, as appended as Schedule "B" of these Minutes, be received;
AND FURTHER THAT payment of the Authority accounts, in the amount of
$1,254,446 00, be approved
CARRIED
14. ADMINISTRATION HEADQUARTERS
-Flooring
Of five quotations requested, the following were received
York Tile $14,850 00
Delta Tile $l5,360 00
Richmond Tile $15,700 00
Leader Tile $17,275 00
-7- B-179
Res #127 Moved by M W H. Biggar
Seconded by E. Fulton
THAT the quotation of York Tile, in the amount of $14,850 00, for the
supply and installation of 8" x 8" Monoceram glazed tile at the Authority
Administration Headquarters, be accepted;
THAT Fairwin Construction Company Limited be retained, at a cost not to
exceed $4,510 00, to carry out the carpentry and labour required for under-
cutting doors, lifting and replacing counters, etc , and to provide general
supervision of the work;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of approval of the Regional Director of the Ministry
of Natural Resources, and the execution of any documents
CARRIED.
15 "A REVISED CONSERVATION AUTHORITIES APPROVAL SYSTEM
-Optional Level of Delegated Authority"
Res #128 Moved by H.C Lawrie
Seconded by W G Barber
THAT the Reg ional Director, Central Region, Ministry of Natural Resources,
be advised that The Metropolitan Toronto and Region Conservation Authority
accepts the Optional Level of Delegated Authority on the understandings as
set out in the Acting Regional Director's letter of April 28, 1983;
AND FURTHER THAT the Authority has assigned its General Manager the
responsibility of giving the approval formerly given by the Regional
Director
CARRIED
16 BY-LAW 154-80 THE MUNICIPALITY OF METROPOLITAN TORONTO
-By-Law to Provide for the Coordination of Response in
the Event of a Disaster Affecting the Metropolitan Area
Res #129 Moved by Mrs N Stoner
Seconded by M W H Biggar
THAT the representative of The Metropolitan Toronto and Region
Conservation Authority on the Emergency Planning Advisory Committee be
the Authority's General Manager, and that the Emergency Planning Advisory
Comm it tee be so advised
CARRIED
17 MINISTRY OF NATURAL RESOURCES' PRIORITY SYSTEM
FOR CONSERVATION AUTHORITY FUNDING
Res #130 Moved by H C Lawrie
Seconded by M W H Biggar
THAT the staff report on the "Ministry of Natural Resources priority
System for Conservation Authority Funding" be received;
THAT it be forwarded to the Minister of Natural Resources as the
Authority's comment with respect to the current system of allocating
provincial funding;
AND FURTHER THAT copies of the report be provided to the Authority's
member municipalities for information
CARRIED
18 TERMINATION
On motion, the meeting terminated at 12 OS P m , May 18
Florence Gell W E J.ones
Chairman Secretary-Treasurer
KC
B-180
SCHEDULE "A"
TO The Cha~~~~n anq ~embers of the Executive Committee, M T R C A ,
Meeting #7/83 - Wednesday, May 18, 1983
FROM Ms S Nimmo, Chairman of the Information & Education Advisory Board
RE REPORT #1/83 - INFORMATION AND EDUCATION ADVISORY BOARD
THE BOARD RECOMMENDS THAT
1 The Kortright Centre for Conservation Central Core Area Plan, as
prepared by the Landplan Collaborative Ltd , dated April 28, 1983,
be received;
2 The staff be directed to obtain proposals from architects for the
design of the sheltered patio eating area;
3 The staff be asked to reconsider the plan for the parking lot, without
removing the existing berms and incorporating Phase II of the plan, to
obtain the necessary parking spaces;
4 Consideration be given to the location of the "stopping area" for
service vehicles;
5 The Preliminary Plans for the Albion Hills Conservation Field Centre's
kitchen, dining room and mudroom, as prepared by D Ross King, Architect,
dated February 10, 1983 and April 22, 1983 (Appendices 1 and 2 hereto) be
approved,
.
6 Humber Bay West, Phase II, be officially opened in late August or early
September (during the Canadian National Exhibition) ;
7 The Chairmen of the Waterfront, Information and Education, Etobicoke-
Mimico and Humber Valley Advisory Boards, along with a representative
from the Mimico Cruising Club, the Etobicoke Yatch Club and the Humber
College Sailing School, be appointed a committee to make the necessary
arrangements;
8 The Sawyer's House or Taylor Cooperage be officially opened in 1983;
9 The Chairmen of the Humber Valley, Information and Education and
Historical Sites Advisory Boards be appointed a committee to~make the
necessary arrangements
SN/TEB/mrp
1983 OS 11
8-181
- I:
~-... ~::~:.. ~t~k,:"~):"':~ Y:i~:' ..;, ~Jf-~.::' .~'. ";:..:~.~.:~.. ::.. ~
_. ~'"
0 -
~
.-. d
--. po
--
-
- -.
., -
~p,
a
(5:)p
c:i
@j ~-l
~
~
c:::5.. i:
a
~o '-- -- 6>
- 0
17
~
V
~ - --. ... . ~
-.~ . m
.. .... . .
e30
c.o <t
~CJ
a
- 80 --
0 CI
"\
if}
lu
APPENDIX 2 --
B-182
" ""'
....~ ': J..... _ -_. ,-,,,.~:,,!
[jJ .,
,-. ...,
"% t~
'-'
] ,. Co (,\
.:1 { ~.iJ ~ (NJ ~~
~ -! t:
Q \
I-~ . . .
. m;5f) ~(...) ! -[l~ (N)_
- -
t:_ _~=_ - - - --.--- -- -.
~ ~..,
-- - .____0_- ._.________...:..-_. --- - -- '..
"
>
'. - .--.-----------..----.-------.. ---~._- -
-.-- - ~ --
. . lf~ ~ ____ ~(M) '.~
. !I;.
t
~.
--.- -
,
w - ---.- -- --- - -- _.-- - ---- .
~~~~;i . ~-::~~
~.~ ~ ~ ....-.;, -- -
- ..... --- ."
~ G'i?.Ai!b~("i:===- .:.=1 -;;' ','
~ ,
----- -- i -- ---j .,:,
.
----- !!l
, .. ._- - - _ os __ ______ __
. ~~(~)
. ---- -- --.
~(N)-~: .. .
~(M~
_WZ5 ~(N)_ ~_(tO______~ ~ -
--- - _ __. __ '___' 0 - tJ" -.- -- - -.
------- --~ ~
- -- --- - . --
0 0 0 0
ill.!:DJ:w ~ ~ ~-~-~ ~
--- - - - - --.--- 0s,u~ '11f~U ~- 'lJOo 8Q
-- ----
--
~I'R\L '2'2/53 _
M =
lD 0:1
rl =
I
0:1 u:J
..J
::J
Cl THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
u:J
:r:
u DIVISIONAL EXPENDITURE SUMMARY
U)
FOR THE PERIOD APRIL 1, 1983 TO APRIL 30, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $ $
Finance & Admin.(inc1 Land Acq ) 3,186,465 198,603 888,246 2,298,219 27 9
Water Resource - Flood Control 2,911,389 185,083 652,437 2,258,952 22 4
Water Resource - waterfront 2,325,000 59,877 191,314 2,133,686 8 2
Conservation Land Management 3,548,345 293,036 986,423 2,561,922 27 8
Information & Education 2,426,623 153,421 635,853 1,790,770 26 2
Historical Sites 3,912,822 167,242 555,328 3,357,494 14 2
Vehicle & Equipment - Capital Acq 280,730 39,734 65,253 215,477 23 2
SUB-TOTAL 18,591,374 1,096,996 3,974,854 14,616,520 21 4
Vehicle & Equipment - Operations -- 13,152 79,542 -- --
Special projects -- 53,840 192,031 -- --
C 0 E D 1983/84 2,123,808 28,782 28,782 2,095,026 1 4
Food Services 833,317 61,676 111,943 721,374 13 4
TOTAL 21,548,499 1,254,446 4,387,152 -- --
---------------------------------------------------------------------
---------------------------------------------------------------------
~
, B-184
the metropolitan toronto and region conservation authority
minutes REPORT #9/83
EXECUTIVE COMMITTEE l-JUNE-1983 #9/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 1 June, 1983
PRESENT FOR THE HEARING
Chairman Mrs. F.E. Gell
Vice-Chairman E.V. Kolb
Members M.W H. Biggar
Mrs. L Hancey
H.C. Lawrie
S.A. Macpherson
Ms. S. Nimmo
J S. Scott
Mrs N. Stoner
Planning & Design Engineer, York Region R. Gee
Asst. Roads Designer, York Region B. Boston
Following the roll call, the meeting recessed to hold a hearing re
The Regional Municipality of York
Town of Richmond Hill
Rouge River Watershed
PFESENT FOR THE MEETING
Chairman Mrs. F.t". Gell
Vice-Chairman E. v. Kolb
Members M.W.H. Biggar
E. Ful ton
Mrs. L. Hancey
H.C Lawrie
S A. Macpherson
Ms. S. Nimmo
J S Scott
Mr S' . N Stoner
Authority Members R.J Crowe-
Dr. W.M. Tovell
ABSENT
Member if .G~ Barber
MINUTES
Res. #:131 Moved by: Mrs._ N.. Stoner'
Sec-onded by: S'.A ~ Macpherson
THAT the Minutes', of Meeting #8/83 be approved.
CARRIED.
SECTION I
ITEM FOR CONSIDERATION
l. APPOINTMENT OF GENERAL MANAGER
Res. #132 Moved by Mrs.. L. Hancey
Seconded by: M-.W H. Bigqar
THE EXECUTIVE COMMITTEE" RECOMMENDS. tha-t the matter of' advertising the
position of. General Manager and the appointment. of a General Man-aqer be left'.
in abeyance until completion' of the Review of- the- Authori ty' s Organization
and Mandate.
CARRIED.
B-185 -2-
SECTION II
ITEMS FOR INFORMATION
2 CORRESPONDENCE
'.lr ~~ t\ ~lcLean , Acting General Manager, reported receipt of the following
correspondence
(a) Letter dated May 17th, 1983, addressed to the Chairman and Members of
the Executive Committee by W R Herrid;je Q C . making suggestions
concerning the membership of the proposed Steering Committee for the
Review of the Authority's Organization and Mandate, and expressing the
view that it would be unfortunate if the work done last year by the
Reorganization Committee were to be lost
Res #133 Moved by E Fulton
Seconded by H C Lawrie
THAT the letter dated May 17th, 1983, addressed to the Chairman and
Members of the Executive Committee by W R Herridge, Q C , be referred to
the Chairman and the Vice-Chairman of the Authority for consideration in
their consultations concerning the establishment of a Steering Committee
for the Review of the Authority's Mandate and Organisation
CARRIED
(b) Three letters dated 19th May, 1983 (2 ) and 27th May, 1983 from R J Crowe
to W A McLean
(il Policy of the Authority regarding 'in camera' meetings of the
Executive Committee,
( iil Attendance at the Special Meeting that the Executive Committee
held with the Chairmen of Metropolitan Toronto and the Regions
(iii) Reply by Mr Crowe to Mr McLean's response to (il and (ii) ,
which Mr Crowe did not consider adequate
Res #134 Moved by Mrs N Stoner
Seconded by M W H Biggar
THAT the correspondence noted in (b) (il , (iil and (iii ) be circulated for
consideration at the next regular meeting of the Executive Committee
CARRIED
(c) Registration material for the following
The 1983 Conservation Authorities Tour - September 18-21, 1983
Thunder Bay, Ontario
38th Annual Meeting of the Soil Conservation Society of America,
July 31-August 3, Hartford, Connecticut
This Authority has been allocated 9 reservations for the 1983
Conservation Authorities Tour, and the following members and staff
would like to attend
Mrs F E Gell
E V Kolb
E Fulton
H C Lawrie
S A Macpherson
J S Scott
M M Smith, Q C
W A McLean
W E Jones
(d) Request from The Association of Conservation Authorities of Ontario
that a staff member from this Authority be made available to serve on
a sub-committee to be established on the Standardisation of Water
Management
-3- B-186
Res #135 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT Mr T E Farrell be appointed to serve on a sub-committee on the
Standardisation of Water Management, to be established by The Association
of Conservation Authorities of Ontario
CARRIED
3 APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 170
Res #136 Moved by Mrs L Hancey
Seconded by Mrs N Stoner
THAT the applications listed herein as A(l) to A(8) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
A(l) Borough of Etobicoke
To construct sanitary sewer crossing of the Berry Creek,
west side Kipling Avenue, north of Rexdale Boulevard
(Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #PSB-3432, Sheet #3, prepared by the Borough of Etobicoke
Engineering Department, and dated March 9, 1981
A(2) Monarch Construction Ltd
To remove existing dam and re-grade area to conform to channel
configuration upstream and downstrea, Burndennett Creek, Town
of Markham (Rouge Rive Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) A drawing of the proposed work prepared by Andrew F Brodie,
dated April 11, 1983
(b) Correspondence describing details of the work dated
April IS, 1983, from Andrew Brodie Associates
A(3) Mr Syd Hopkinson
To place fill at rear of #8041 Kennedy Road, Town of Markham
(Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A photo-copy of part of a plot plan prepared by Peter Dehaan,
dated January, 1983
A (4) Mr Antonio DaCosta
To construct residence in Regional Storm flood plain of the
Humber River, south of King Street, east of John Street,
Village of Bolton
In accordance with the following documents and plans, which shall form
part of the permit
Site Plan prepared by Aaron Designs
B-187 -4-
A(5) Emilio Vagni Investments Ltd
To repair concrete seawall at rear of #2 Lakeshore Drive,
directly west of southerly extent of Sand Beach Road
(Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
Site Plan and Section as prepared for Mr W Williams, and
dated March 26, 1983
A(6) Old Mill Investments Ltd
To construct retaining wall and to re-construct parking lot
adjacent to the Humber River, Part Lot 1, R P R-1662, Borough
of Etobicoke
In accordance with the following documents and plans, which shall form
part of the permit
(a) Plan of Survey, Project #69-73, as prepared by B J Haynes,
Ontario Land Surveyor
(b) Gabion basket wall being constructed as per cross section
plan as submitted by Old Mill Investments Ltd
A (7) The Municipality of Metropolitan Toronto Parks & Property Department
To construct parking lot on flood plain of the Humber River,
James Gardens, Borough of Etobicoke
In accordance with the following documents and plans, which shall form
part of the permit
(a) The site plan as prepared by the Metropolitan Toronto Parks
Department, which has been designated as "Silver Creek
Parking Lot"
(b) The landscaping earth berm along and adjacent to the westerly
limit of the proposed lot being deleted from the site plan
A(8) The Jewish Community Centre of Toronto
To construct pedestrian bridge across the Don River opposite
Y M H A Recreation Centre, #4588 Bathurst Street, City of
North York
In accordance with the following documents and plans whiCh shall form
part of the permit
Proposed plan as prepared by Alex Tobias Associates Ltd , drawing
#Sl, Contract #8223, dated December 21, 1982 and revised March 15,
1983 (as indicated)
4 REPORT #2/83 - BUDGET & fINANCE SUB-COMMITTEE
Res #137 Moved by E V Kolb
Seconded by J S Scott
THAT subject to the approval of the Regional Director of the
Ministry of Natural Resources, the firm of Woods Gordon, Management
Consultants, be retained to make a comprehensive study of the procedures
and organization of the purchasing function of the Authority, and provide
a report for both short-term and long-term opportunities for improvement
in accordance with their letter of April 21, 1983 at a cost not to exceed
$6,500 00, subject to these funds being available from the Ccmmunications
budget of the finance & Administration Division
CARRIED
-5- B-188
5 DECISION OF HEARING
-The Regional Municipality of York
Town of Richmond Hill
Rouge River Watershed
Res #138 Moved by J S Scott
Seconded by M W H Biggar
THAT the application of The Regional Municipality of York, in accordance
with Ontario Regulation 170, for permission to alter a watercourse in
the vicinity of 16th Avenue and Leslie Street in the Town of Richmond Hill
(Rouge River watershed), be refused for the following reason
That the application, as submitted, will affect the control
of flooding wherein upstream flood elevations will be
increased
CARRIED
6 TERMINATIOt\
On motion, the meeting terminated at 11 20 a m , June 1st
Florence Gell W E Jones
Chairman Secretary-Treasurer
KC
c... B-189
,
the metropolitan toronto and region conservation authority
minutes REPORT #10/83
EXECUTIVE COMMITTEE ls-JUNE-1983 #lO/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, IS June, 1983
PRESENT
Chairman Mrs F.E. Gell
Vice-Chairman E.V Kolb
Members W.G. Barber
M.W.H. Biggar
E. Fulton
Mrs L. Hancey
H.C. Lawrie
S.A. Macpherson
Ms. S. Nimmo
J S. Scott
Mrs. N. Stoner
Authority Member R.J. Crowe
MINUTES
Res #139 Moved by W.G. Barber
Seconded by M.W.H. Biggar
THAT the Minutes of Meeting #9/83 be approved.
CARRIED
SECTION I
FOR CONSIDERATION
1 PROJECT FOR THE ACQUISITION OF THE
TORONTO BRICK COMPANY LIMITED
Res #140 Moved by M W H. Biggar
Seconded by Mrs L. Hancey
THE EXECUTIVE COMMITTEE RECOMMENDS THAT a "Project for the Acquisition of the
Toronto Brick Company Limited - 1983". as amended. and appended as Schedule
"A" of these Minutes, be approved,
AND FURTHER THAT the following action be taken
(a) The Municipality of Metropolitan Toronto be designated as the
benefiting municipality on the basis set forth in the project.
(b) The Government of Ontario be requested to approve the project
and a grant of 55% of the cost thereof,
(c) Pursuant to Section 24 of the Conservation Authorities Act,
approval of the Ontario Municipal Board be requested,
(d) When approved, the appropriate Authority officials be authorised
to take whatever action is required in connection with the project,
including the execution of any documents.
(e) The project be approved provided that the Province of Ontario, in
considering its approval of the item, agrees that the work shall be
undertaken without prejudice to existing programs of the Authority
and the funding previously approved and existing within the
Metropolitan Toronto Capital Works Program for The Metropolitan
Toronto and Region Conservation Authority purposes.
CARRIED
B-190 -2-
2. POWERS OF THE AUTHORITY
Res #141 Moved by Mrs L. Hancey
Seconded by J.S Scott
THAT a copy of a letter, dated May 26, 1983, from Mr John B Conlin, Q C , of
the legal firm Gardiner, Roberts, together with a copy of the Authority's
Regulations, be forwarded for information to each member of the Authority
CARRIED.
3. COUNSEL REPRESENTATION AT ALL AUTHORITY MEETINGS
At Meeting #3/83 of the Authority, the following resolution was adopted
'Res. #56
THAT the Executive Committee investigate the cost factor and other
data on having a representative of Gardiner Roberts in attendance
at every Authority meeting
CARRIED ,
Res #142 Moved by J.S Scott
Seconded by E Fulton
THAT in accordance with direction of Authority Meeting #3/83, the
information received from Mr John B Conlin, Q C , of the legal firm
Gardiner, Roberts concerning fee for attendance at Authority meetings,
be referred to the full Authority
CARRIED
SECTION II
FOR INFORMATION
4 CORRESPONDENCE
Mr W A McLean, Acting General Manager, reported receipt of the following
correspondence
Letter received June 3 from Mr W.G Barber, member of the Executive Committee
requesting that the Committee authorise him to attend the American Public Workl
Association Annual Congress, to be held in Detroit - September 10-15, 1983
On this occasion, Mr Barber is to be the recipient of the first Honorary
Membership Award of the Utility Location and Coordination Council.
Res #143 Moved by E. V . Kolb
Seconded by Mrs L Hancey
THAT Mr W G Barber be authorised to attend the Annual Congress of the
American Public Works Association, to be held in Detroit - September 10-15,
1983, and that his expenses in this connection, in the estimated amount of
$632 00, be paid,
AND FURTHER THAT Mr Barber be congratulated upon the recognition of the
Utility Location and Coordination Council for his many contributions to
the ULCC concept and outstanding success in the Metro Toronto area
CARRIED
5 APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 170
Res #144 Moved by Mrs. L Hancey
Seconded by M W.H Biggar
THAT the applications listed herein as A(l) to A ( 11 ) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
-3- B-19l
--
A(l) The Regional Municipality of York
To re-construct 16th Avenue over the Beaver Creek, including
roadway widening and replacement of culvert, Town of
Richmond Hill (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
All work being carried out in accordance with Drawings submitted -
P-l08s-2, 5-277 , Sheet No. 16, as prepared by The Regional
Municipality of York Engineering Department, and dated April 25,
1983.
A(2) The Regional Municipality of York
To widen Leslie Street and replace culvert on the Beaver Creek,
Town of Richmond Hill (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
All work being carried out in accordance with drawings submitted
(P-l08l-6, 5-273-1), as prepared by The Regional Municipality of
York Engineering Department, and dated April 25, 1983
A(3) toIargaret E. Tamblyn
To erect chain link fence around existing swimming pool within
Regional flood plain, #12 Littlebrook Court, Town of Markham
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan of the subject lands on which the applicant has
marked the location of the proposed fence in red.
A(4 ) Borough of York
To demolish existing Scarlett Road bridge over the Black Creek
and replace it with four-lane structure, Lot 8, Concession HR,
and Block I AI, Plan 5052, Borough of York (Humber River
Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing Nos. 34l88-l3K 1 and 2, 34l88-2H-7, 8, 10, and 11,
prepared by Fenco Engineers Inc.
A(s) Borough of York
To widen and renovate Scarlett Road bridge over the Humber River,
Part Lot 9, Concession HR, Borough of York
In accordance with the following documents and plans, which shall form
part of the permit
Drawing Nos 34l88-2H-9, 8s74-2H-3, 8s74-7T-l, prepared by
Fenco Engineers Inc
B-192 -4-
A(6) York Excavating & Paving Co Ltd
To grade and stabilize section of valley slope and con~truct
storm sewer outfall, north of Langstaff Road, east of Keele
Street, Town of Vaughan (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan prepared by Mastrodicasa Engineering Ltd , Project
#8226, and dated April 18, 1983
A(7) Muriel & Henry Brown
To build two small retaining walls on the side slope of the
Highland Creek valley, rear of #311 Beechgrove Drive, Borough
of Scarborough
In accordance with the following documents and plans, which shall form
part of the permit
A cross-section prepared by S.A Szenasi Contracting, received
in this office May 10, 1983
A(8) Mr P Douglas Sheen
To grade area of #1467 Rougemount Drive, Town of Pickering, for
erection of single-family dwelling (Petticoat Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Project #SP-ls34, Sheets 1, 2, and 3, prepared by the applicant.
A(9) Red Cedar Investments Ltd
To construct subdivision north of Woodbridge Avenue, west of
Clarence Street, Village of Woodbridge (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing Nos A-A-l and A-A-2, Project #898, as prepared by
Young & Wright Architects and dated April 11, 1983, and
stamped by M.C Kazdan, P Eng
A(lO) Mr & Mrs Joseph Kreiner
To replace culverts at #981 Teston Road, Town of Vaughan
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A sketch prepared by Joseph Kreiner, showing the proposed
location of the culverts
A(ll) Gulf Canada
To grade north-west corner Bayly StreetjWestney Road South, and
construct gas bar and car wash (development to include concrete
retaining wall) , Town of Ajax (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings #82-3136 and 82-3156, prepared by Gulf Canada Limited
and dated March and April, 1983, respectively
-5- B-193
A(l2 ) Eileen & Michael Connor
To place fill at rear of #1 Lakehurst Crescent, Borough of
Scarborough (Waterfront)
Application withdrawn
6. BOROUGH OF YORK
-Request for Authority-owned land for widening of Scarlett Road,
vicinity of Cynthia Road
(Humber River Watershed)
Res #145 Moved by S A. Macpherson
Seconded by: Mrs. N. Stoner
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Borough of York to grant a conveyance of
Authority-owned land to facilitate the widening of Scarlett Road in the
vicinity of Cynthia Road,
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with the
Borough of York in this instance,
THAT a conveyance of 0 084 acres, more or less, be granted to the Borough
of York for the widening of Scarlett Road in the vicinity of Cynthia Road,
said land being Part of Lot 28, Registered Plan 789, Borough of York
(The Municipality of Metropolitan Toronto). Consideration to be the sum
of $2.00, plus ?ll legal, survey, and other costs,
THAT said conveyance be subject to an Order-in-Council being issued in
accorQance with Section 2l(c) of The Conservation Authorities Act, R.S.O.
1980, Chapter 85, as amended,
AND FURTHER THAT the appropriate Authority officials be authorised and
directed to take whatever action may pe required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED.
7 REPORT #1/83 - TENDER OPENING SUB-COMMITTEE
-Bolton Flood Control Project Phase II
Res. #146 Moved by Mrs. L Hancey
Seconded by M W.H. Biggar
THAT Report #1/83 of the Tender Opening Sub-Committee, as appended as
Schedule "B" of these Minutes, be rec;:eived,
AND FURTHER THAT the contract for the Bolton Flood Control Works Phase II
be awarded to Sonterlan Construction Corporation in the amount of
$859,099 41, it being the lowest proper tender
CARRIED
8 HUMBER RIVER CHANNEL IMPROVEMENTS FORMER VILLAGE OF BOLTON
-Extra Work Orders Nos 6 and 7
Res. #147 Moved by Mrs L. Hancey
Seconded by M W H. Biggar
THAT Extra Work Orders Nos 6 and 7 to the contract for Humber River
Channel Improvements in the former Village of Bolton, in the amounts of
$50,270 00 (deletion) and $50,260 00 (addition) respectively, be approved,
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested
CARRIED
B-194 -6-
9 M.T R.C.A -&- THE REGIONAL MUNICIPALITY OF DURHAM
-Extension of Rental Agreement #527 & #531 Rodd Avenue, Town
of Pickering (Waterfront)
Res #148 Moved by J S Scott
Seconded by H.C Lawrie
THAT the existing rental arrangement between the Authority and The Regional
Municipality of Durham concerning the properties municipally known as #527
and #531 Rodd Avenue, Town of Pickering, be extended for an additional one-
year term, terminating June 30, 1984,
THAT the appropriate Authority officials be authorised and directed to take
whatever action may be required to give effect thereto, including the
execution of any documents,
AND FURTHER THAT no further extension of said rental arrangement be granted
beyond June 30, 1984
CARRIED.
10 AQUATIC PARK
-Canada Goose/Gull Management Plan Terms of Reference
Res #149 Moved by Mrs L. Hancey
Seconded by H C. Lawrie
THAT the Terms of Reference entitled "Canada Goose/Gull Managemen t Plan",
as appended as Schedule "C" of these Minutes, be approved,
THAT the Terms of Reference be forwarded to the Ministry of Natural Resources
for consideration and approval,
THAT Dr Peter Fetteroff be retained to carry out the study, at a cost not
to exceed $8,100.00,
AND FURTHER THAT the appropriate staff be authorised to take the necessary
measures to give effect thereto
CARR.IED
11 MARKETING PLAN CONSERVATION AREAS, BLACK CREEK PIONEER VILLAGE,
AND THE KORTRIGHT CENTRE FOR CONSERVATION
Res #150 Moved by W G Barber
Seconded by H C Lawrie
THAT the proposal of Woods Gordon for the provision of professional
assistance in the development of questionnaires, methods of sampling,
sample size, and analysis and interpretation of data required for the
1984 Marketing Plan, in the amount of $6,000 00, be accepted
CARRIED.
12 ALBION HILLS CONSERVATION FIELD CENTRE
-Ontario Bui.lding Code Up-date & Dormitory Re-design
Of three proposals invited to (a) review the Ontario Building Code and to
make recommendations on fire safety up-date and handicapped provisions,
(b) re-design the dormitory at the Albion Hills Conservation Field Centre,
the following were received
Firm Fee Quoted
Stafford-Haensli Architects $4,300 00
Strong Associates, Architects $7,500 00
-7- B-19s
--
.
Res. #151 Moved by J.S Scott
Seconded by Mrs N Stoner
THAT the proposal of Stafford-Haens1i, Architects, to (a) review the Ontario
Building Code and make recommendations on fire safety and handicapped
provisions, and (b) to re-design the dormitory at the Albion Hills
Conservation Field Centre, in the amount of $4,300 00 (including expenses),
be accepted, it being the lowest quotation received
CARRIED.
13 . KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme Purchase of Electric Vehicle
Res. #152 Moved by Mrs N. Stoner
Seconded by M.W H. Biggar
THAT the purchase of a Marathon C-300 electric, four-passenger vehicle from
the Electric Transportation Corporation, in the amount of $3,200.00, plus
applicable taxes, be approved
CARRIED.
14. REPORT #2/83 - OFFICIAL OPENING SUB-COMMITTEE
Humber Bay West Waterfront Area Phase II
Res. #153 Moved by E.V. Kolb
Seconded by Ms S. Nimmo
THAT Report #2/83 of the Official Opening Sub-Committee be received,
AND FURTHER THAT the following action be taken
(a) Humber Bay West Waterfront Area, Phase II, be officially opened
on Friday, September 2, 1983,
(b) The Honourable John B Aird, Lieutenant-Governor of Ontario, be
invited to officially open the area,
(c) The Executive Committee host the platform party for lunch
preceding the opening
CARRIED
IS PLAN INPUT AND REVIEW FLOOD PLAIN MANAGEMENT
-Role of Conservation Authorities in Ontario
Res. #154 Moved by H.C. Lawrie
Seconded by Mrs N. Stoner
THAT the Minister of Natural Resources be advised that the Authority accepts
the Minister's mandate with regard to authorities being the sole commenting
agencies on flood plain management matters,
AND FURTHER THAT it will continue to deal with flood plain matters in
accordance with the policies set out in its Watershed Plan and having regard
for Government policies on flood plain criteria
CARRIED.
.
16 CORRESPONDENCE FROM AUTHORITY MEMBER ROGER J. CROWE
Res #155 Moved by Mrs L. Hancey
Seconded by Ms S Nimmo
THAT as a matter of policy, non-Executive Authority members be permitted to
attend Special and "in camera" meetings of the Executive Committee
CARRIED
B-l96 -8-
17. FINANCIAL REPORT & ACCOUNTS FOR
THE MONTH ENDING MAY 31, 1983
Res. #156 Moved by J.S Scott
Seconded by Mrs. N Stoner
THAT the Divisional Expenditure Summary for the period May 1-31, 1983, as
appended as Schedule "D" of these Minutes, be received,
AND FURTHER THAT payment of the Authority accounts, in the amount of
$l,307,234 00, be approved.
CARRIED.
18 PROJECT FOR EROSION CONTROL & SLOPE STABILIZATION
IN METROPOLITAN TORONTO: 1982-1984
-Proposed Remedial Work at Rear of #12-42 Delroy Drive and
#47-51 Berl Avenue, Borough of Etobicoke (Mimico Creek)
Res #157 Moved by Mrs. L. Hancey
Seconded by S.A. Macpherson
THAT erosion control remedial work be carried out at the rear of Nos.
12-42 Delroy Drive at 47-51 Berl Avenue, Borough of Etobicoke, at an
estimated cost of $143,000 00,
THAT 14 (fourteen) benefiting owners contribute a total of $8,127.00,
THAT 14 (fourteen) owners provide a permanent easement over the lands
where work is carried out,
THAT the owners of No 24 Delroy Drive and No 49 Berl Avenue give the
Authority title to the lands where the work is to be carried out in
lieu of a cash contribution,
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested
CARRIED
19 FOOD SERVICES
-Equipment, Furniture, Smal1wares,
Mobile Catering Equipment
Quotations have been received from the following companies for the supply
of the above-noted items
Ideal Food Services Equipment
European Hotel & Restaurant Imports Ltd
Russell Food Equipment Ltd
Samsonite
Eaton's (Warehouse Store)
General Freezer
The McMichael Canadian Collection
Res #158 Moved by w.G. Barber
Seconded by H C Lawrie
THAT the staff be authorised and directed to purchase food service equipment,
furniture, smallwares, mobile catering equipment, and to carry out necessary
repairs and facility improvements at the food service outlets, to a maximum
of $25,000 00, from the lowest individual quotations received
CARRIED.
20. REPORT #1/83 - PERSONNEL-SUB-COMMITTEE
Res #159 Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT Recommendation #1 of Report #1/83 of the Personnel Sub-Committee, as
follows
-9- B-197
That a 1983 economic adjustment of 37~ per hour be given to
staff members holding the positions of
Senior Sales Clerk, Black Creek Pioneer Village
Gift Shop Clerk, Black Creek Pioneer Village
Admissions Clerk, Black Creek Pioneer Village
Gift Shop Clerk, Kortright Centre for Conservation (except students)
Supplementary field staff as designated
be approved.
CARRIED
Res. #l60 Moved by Mrs. L. Hancey
Seconded by S A. Macpherson
THAT Recommendation #2 of Report #1/83 of the Personnel Sub-Committee, as
follows:
That two salary ranges be established for gift shop sales staff, one
range for part-time and one for seasonal staff, that are in line
with market rates
Part-time $4.87 - $5 37 - $5 87
Seasonal $5 87 - $6 62 - $7 37
be approved
CARRIED.
Res #16l Moved by Mrs. L. Hancey
Seconded by M W H. Biggar
THAT Recommendation #3 of Report #1/83 of the Personnel Sub-Committee
That the personnel policy regarding part-time or seasonal employees
being sent home due to la~k of work be approved
POLICY STATEMENT
EMPLOYEES BEING SENT HOME DUE TO LACK OF WORK
If a part-time or seasonal employee
is required to report for work, and
.is notified by the Supervisor that conditions exist such
that work cannot commence or must be stopped, and
cannot be re-assigned to other duties for that day
the employee will be paid
(a) For the hours worked plus two additional hours to a maximum
of the number of hours the employee was scheduled to work
that day if the existing conditions are beyond the control
of the Authority (e g weather conditions, fire, power
failure, etc.).
(b) For a minimum of three hours if the employee was scheduled to
work more than three hours that day to a maximum as in No 1
above if the existing conditions are within the control of
the authority (e g too many employees scheduled that day,
insufficient park attendance, not enough equipment available,
etc. )
be approved
CARRIED
Res. #162 Moved by Mrs L Hancey
Seconded by H C Lawrie
THAT Re~ommendation #4 of Report #1/83 of the Personnel Sub-Committee, as
follows
B-198 -10-
That effective March 1, 1983, Mr J Berry be promoted to the
position of Superintendent, Works, at the classification of" SMl,
level 4,
That effective June 1, 1983, Mr J Berry be named Acting
Superintendent of Waterfront Development until December 31, 1983,
or on the return of Mr. Mulholland, whichever occurs first, at the
classification of 5M2, level 2,
And Further That effective February l, 1983, Mr R Marinzel be
promoted to the position of Assistant Superintendent, Works, at the
classification of GF3, entry level
be approved
CARRIED
Res #163 Moved by E. Fulton
Seconded by Mrs L. Hancey
THAT Recommendation #5 of Report #1/83 of the Personnel Sub-Committee, as
follows
THAT the Deputy General Manager, in recognition of the additional
responsibilities that he is carrying due to the absence of the General
Manager, be temporarily re-classified at the SMsE, level 5, category,
such re-classification to be effective April 1, 1983, and to continue
until such time as the position of General Manager has been resolved
and filled
be approved
CARRIED
Res #164 Moved by Mrs L Hancey
Seconded by M W.H. Biggar
THAT Recommendation #6 of Report #1/83 of the Personnel SUb-Committee, as
follows
That Mrs. Eileen Wigg's retirement date be extended to the end of
the first week in January, 1984
be approved
CARRIED
Res #165 Moved by Ms S Nimmo
Seconded by Mrs N Stoner
THAT Recommendation #7 of Report #1/83 of the Personnel Sub-Committee
not be approved
CARRIED
21 TERMINATION
On motion, the meeting terminated at 11 40 a m , June IS
Florence Gell W E Jones
Chairman Secretary-Treasurer
I,
6-199
SCHEDULE "A"
u THE METROPOLITAN TORONTO AND REGION
CONSERVATION AUTHORITY
"PROJECT FOR THE ACQUISITION
OF THE
UNITED CERAMICS LIMITED
(FORMERLY TORONTO BRICK COMPANY LIMITED)"
MAY, 1983
1-
B.,.200
CONTENTS
I PURPOSE OF PROJECT
II LOCATION AND DESCRIPTION
III COSTS AND FINANCING
-
~
8-201
I PURPOSE OF THE PROJECT
The purpose of this project is to enable the Authority to
acquire the Toronto Brick Company Limited The acquisition
of this property is in accordance with the Authority's
"Objects" as defined in The Conservation Authorities Act,
R S 0 1980 Chapter 85 by Section 20, as stated below
The objects of an authority are to establish
and undertake in the area over which it has
jurisdiction a program designed to further
the conservation, restoration, development
and management of natural resources, other
than gas, oil, coal and minerals
The acquisition of this property is also in accordance with
the goal of the Authority's Land Acquisition Program which
forms part of the Authority's Watershed Plan as adopted by
the Authority in December, 1980
The goal of the Authority's Land Acquisition Program is
To acquire Hazard and Conservation Land in
order to protect it against unwise Land Use
which would affect the ability of the land
to perform its natural functions, and to
conserve significant and sensitive land for
the benefit of the people of the Region ,
To achieve this goal, the objectives of the Land Acquisition
Program will be to define and delineate those lands which
portray the following characteristics and to pursue their
acquisition subject to availability and funding
(a) those hazard lands which are defined as being
flooded by the Regional Storm;
(b) those lands which, due to physical hazards of
slope instability and/or unstable soils, are
not suitable for development;
(c) those conservation lands of a significant and/
or sensitive natural character which are best
managed by a public agency to retain their
natural characteristics
The Toronto Brick Company Limited exhibits all three of
these characteristics and as such should be acquired and
retained as a valuable pUblic resource
~
B-202
II LOCATION AND DESCRIPTION
Since its inception in 1957, the Authority has pursued a
comprehensive water and related land management program
including, as one component, the acquisition of hazard
and conservation lands The acquistion component has
resulted in public ownership of significant stretches of
valley systems and the Lake Ontario waterfront, ensuring
their long term protection from unwise use An important
ancillary benefit has been the creation of opportunities
for public use on these lands and their function as the
backbone of the regional open space system
The acquisition of the Toronto Brick Company Limited,
located in the Lower Don River Valley between Bloor Street
and Pottery Road as shown in Figure 1, would be an important
addition to the lands owned by The Metropolitan Toronto and
Region Conservation Authority and would preserve this very
unique site for the benefit of the public for all time
The entire site is estimated to be comprised of 19 hectares
with approximately one quarter of the area being occupied
by a complex of industrial buildings and brick storage
areas The remainder of the site is a terraced clay quarry
measuring approximately 240m by 550m which has been
excavated below the ravine bottom to a depth of about 60m
The brick yard property is desi~nated within the Authority's
Land Acquisition Program as lands which are suitable for
acquisition by the Authority based on the criteria set out
in the program and reiterated in the "Purpose" of this
project
Since the Land Acquisition Program forms part of the
Authority's approved Watershed Plan, the brick yard property
can be considered for acquisition by the Authority Figure
2 illustrates a portion of the Authority's master plan for
acquisition in the lower Don River Valley and illustrates
that the Toronto Brick Company property is included within
the Authority's acquisition limits
In determining as well the suitability for acquisition of
these major parcels, the Authority places priority on those
lands which will fill a gap in existing Authority or public
holdings The Toronto Brick Company property is one of only
four properties remaining in private ownership within the
lower Don River Valley By bringing the Toronto Brick
Company property into public ownership, a virtually
--
r
B-203
,
..-..
BRICK YARD
",.
DON VALLEY BRICKYARD
SITE LOCATION MAP
) ~...:o "" -.00 Fig. 1
(,
I
I
\
EGLINTON AVE. E.
AVE.
DON VALLEY BRICKYARD
ACQUISITION LIMITS
HAZARD LANDS r.......t
". . . . . . . . . ~
CONSERVATION LANDS -
~ . Fig 2
Vthe metropolitan toronto and regIon
conservation authority
u
--
1
B-20s
continuous public open space will be provided from Dundas
Street to Eglinton Avenue as shown on Figure 3 The
Authority has previously acquired similar industrial
properties within the Don Valley and by doing so has
maintained and made available a valuable natural resource to
the public of Metropolitan Toronto
As can be seen in Figure 4, most of the Toronto Brick
Company property including all of the buildings and brick
storage area is located within the Regional floodplain of
the Don River It is estimated that the flood depths in
this area under the Regional flood will be 5 6 metres and in
excess of 1 meter for the 100 year flood.
Not only is the property susceptible to the Regionai flood
but the buildings are susceptible to something less than the
5 year flood. In fact the brick yard has been flooded or
nearly flooded almost annually over the past 5 years On
the occasions where the buildings were not flooded, however
access has been restricted due to the necessity to close the
Bayview Avenue Extension as a result of high water on the
road
Preliminary estimates of the flood damages that could be
expected based on a study prepared in 1979 indicated a
pre~nt value of average annual damages of $310,000 This
figure represents only the identifiable damages and does
not include intangibles such as loss of business, emergency
response costs, lost revenues, and lost salaries and wages
~ Public ownership of this property would ensure that flood
damages and losses to the existing private industry or
potential future uses would not be perpetuated
Not only is this property located within the Regional floo~
plain of the Don River but it has been designated by many
sources as a site which demonstrates one of the most
complete records of Pleisticene geology in North America
if not the world
The Metropolitan Toronto and Region Conservation Authority
in its Environmentally Significant Areas Study has identified
this property as being regionally, provincially and
nationally significant Extensive study and recording of
the stratigraphy if the brick yard quarry has also been done
by the Ministry of Natural Resources and various universities
and other earth science agencies
The planning and development of the area for public uses;
once acquired, will be done in conjunction with the
Municipality of Metropolitan Toronto In view of the fact
that most of the property has been excavated to a depth of
approximately 60m some filling will be required to maximize
Z.
B-206
,
,
DON VALLEY BRICKYARD
LAND OWNERSHIP
MTRCA LANDS _
PUBLIC LANDS ~
PRIVATE LANDS t..... .. .j
I
~ the metropolitan toronto and region Fig 3 I
__~ /: V"" Conservation authonty
--
- -
DON VALLEY BRICKYARD
FLOODPLAIN MAPPING B-20 7
REGIONAL FLOODUNE ........
5 YEAR FLOOOUNE --'-'- ~ --==-. - ~
'0
B-208
the use of the area The extent and method of filling will
form a major part of the planning process Any filling
plan that is proposed will also ensure that the geologic
record is maintained and developed as a feature of the area
The photographs in Figure 5 better illustrates the property
and show the valuable asset that will be retained for flood
plain, public open space and scientific purposes
: . .
,. -, .'.
. < . .:".:
) ,
-
------
..-
~--
'"
. '" ~
'"<'!
. ~"':
<~ "., " .. '. . .~ ~::;;,.:~....t
,.,'~:'!;t~;~;a,...., 0S "<~f'y;1F!f?itlJ.
. '.: ....:' \''. '.', "~ l' ~'i;~;5'.', ';i:,~
. " . :', ,'.: ," ; \ ".,-'~~~~ .', ".1 .,
'-.:~..>..:~~-,'~~\.~~ .~,.,-\ ~,jt '.:<....r.->r._._.-::;-...:::~~iO"'
'~"'---''''''''''' ~, .j!; ~""\l- ". -...~. ~,.,_
. ':; .:;-~~.~i~..-, .:- ;:: 1 l. .~..:-_.lf~:{~~;~~~~~~. .~" .
. ~:~.~<::..".. ~:..~~ '-ni\"'::~,~,'.~ ~,.~-~.~ :.~ .. ','
,:,:. i~ ~S ....'~?\ .~i.:'~'.,r ~1:- ~ ...' . . ~~"'~" .~
.-.,,-.....;;.... . 't )~,.~..~_... .... - - ...-:.~-
~~:;~~~. .... ";.. ~~ -:
....... .\
.
B-2l0
III COSTS AND FINANCING
The costs associated with this project include the property
acquisition costs plus all legal and survey fees
COSTS
Property $4,000,000
Legal and Survey, etc 200,000
Total $4,200,000
FINANCING
It is proposed that the funds required for this project
be raised on the basis of a 55S grant from the Province
of Ontario and 45S from the Municipality of Metropolitan
Toronto as benefiting municipality
Province of Ontario $2,310,000
Municipality of Metropolitan 1,890,000
T'oronto
Total $4,200,000
B-211
SCHEDULE "B"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
- -
REPORT n 1/83
OF THE
TENDER OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office,
5 Shoreham Drive, Downsview, on Wednesday, June 1, 1983 commencing at
9 30 a m to consider the following tender
'BOLTON FLOOD CONTROL WORKS - PHASE II'
PRESENT
Chairman Mrs. F. Gell
Vice Chairman Mr E V Kolb
Acting General Manager Mr W McLean
Secretary-Treasurer Mr W E Jones
Consulting Engineer Mr D Yaeger
Staff Mr J C Mather
Mr R W Dewell
The Committee was advised that six tenders for the project were
received as follows
Contractor Tender Amount
$
Sonterlan Construction Corp 859,099 41
Toronto Zenith Contracting Ltd 1,007,159 00
Folco Construction Equipment Ltd 1,013,280 50
Mardave Construction Ltd 1,026,510 00
Starnino Construction 1,045,080 00
Looby Builders (Dublin) Ltd 1,121,435 00
The Tender Opening Sub-committee referred the tender documents to the
Consultants, Marshall Macklin Monaghan Ltd for their review and
recommendation
IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT
All tenders received for the Bolton Flood Control Works - Phase II be
submitted to the Engineering Consultants for their review and report,
with recommendations to be supplied to the Executive Committee at their
meeting of Wednesday, June, 15, 1983
F Gell (Mrs) W E Jones
Chairman Secretary-Treasurer
1983 06 07
RWDI fs
B-2l2
SCHEDULE "CD
TERMS OF REFERENCE
CANADA GOOSE/GULL MANAGEMENT PLAN
PURPOSE
To identify Canada Geese/Gull problems and problem areas along
the Toronto Waterfront with emphasis on Aquatic Park, and
provide management recommendations
BACKGROUND
In the past few years there has been an enormous increase in
the number of gulls specifically Ring-billed Gulls, and
Canada Geese in the Toronto Area The increase in gulls has
largely been due to the nesting habitat provided by the
construction of Aquatic Park. Approximately 20 pairs of Ring-
billed Gulls nested at Aquatic Park in 1973 and increased to
some 75,000 to 80,000 pairs in 1982 Having such a large and
seemingly growing population in an urban setting, has raised
a number of problems and concerns to both the public and
private sector
The Authority's involvement in waterfront development for
recreational uses, has made this a real concern It is
therefore necessary that the gull/geese problems and possible
management strategies be addressed
/2
--
B-213
-2-
STUDY AREA
The general study area for this undertaking is the Toronto
Waterfront from Etobicoke to Ajax, as well as determining the
extent of the problem inland This is specifically to include
Marie Curtis, Humber Bay, Bluffers Park, Ashbridges Bay, Aquatic
Park, Petticoat Creek Conservation Area, Ajax Waterfront, Black
Creek Pioneer Village, Metropolitan Toronto Zoo~ and other sites
to be mutually agreed upon
BACKGROUND REPORTS
As this study is of limited duration (maximum of 5 months)
the consultant is expected to rely considerably on existing
literature and data
To help facilitate the study, there are a number of reports
that the consultant should refer to
Blokpoel, H 1983 Gull problems in Ontario
Blokpoel, H 1982 A summary report on work by CWS
at the Eastern Headland of the
Toronto Outer Harbour during 1982
Blokpoel, H 1977 Gulls an4 terns nesting in northern
Lake Ontario and the upper St
Lawrence River
C W S.-Progress Notes No 75,
July, 1977
Blokpoel,H ,P M Catling, 1977 Relationship between nest sites
& G T. Haymes of Common Terns and vegetation
on the Eastern Headland, Toronto
Outer Harbour Can J Zoology
56(9) 2057-2061, 1978
Blokpoel,H & 1977 Colonization by gulls and terns
P M Fetterolf of the Eastern Headland, Toronto
Outer Harbour Bird-Banding 49(1),
Winter 1978
Blokpoel, H & 1978 Origins of Ring-billed Gulls at
G T Haymes a new colony Bird-Banding,
Summer 1979, 50(3) 210
Blokpoel, H & 1977 How the birds took over Leslie Spit
G T Haymes Can Geog J 96(2) 36,Apr/May 1978
Blokpoel, H & 1982 Immigration and recruitment of Ring-
P A Courtney billed Gulls and Common Terns on
the lower Great Lakes
Haymes,G T & H Blokpoel 1978 Food of Ring-billed Gull chicks
at the Eastern Headland of the
Toronto Outer Harbour in 1977
Can Field-Naturalist 92 392
Haymes,G T & H Blokpoel 1977 Reproductive success of larids
nesting on the Eastern Headland
of the Toronto Outer Harbour in
1977 Ont Field BioI 32(2) 78
Weseloh,D V & 1979 Ring-billed Gull
H Blokpoel C W S -Hinterland Who's Who
13 .
B-2l4
-3-
In addition to these reports, the consultant will examine
minutes of the Canada Goose and Gull Committee meetings and
seek further data from such appropriate sources as the
literature, university research and public agencies such as
The Toronto Harbour Commissioners, The Ministry of the
Environment, Ministry of Natural Resources, Ministry of
Health, local municipalities, local Humane Societies, etc
INVOLVEMENT OF OTHER GROUPS
Although the proponent of this study is the Authority, there
are other agencies which experience similar problems such as
the local and regional Parks Departments, Ontario Place and
Harbourfront
These and other external groups which will input into the
study include
CWS for expertise
MNR for expertise, involvement, interest and action
Local Health Units for data
Humane Society for expertise and data
User Groups/Public/Special Interest Groups for input
etc
This list is not intended to be limiting and therefore
additional groups will be added if deemed appropriate by the
consultant in consultation with the Authority
STUDY PROCESS
The consultant is required to review existing information,
and seek and collect data to achieve the purpose of the
study
The study will be undertaken using two approaches
1 contact with appropriate government agencies
2 user surveys
Liason with appropriate government agencies will be under-
taken in consultation with the Authority
The following are the major undertakings required It must
be noted that many of the steps are interrelated and each
must be viewed in relation to the whole for the successful
completion of the study
-
/4
--
B-2ls
-4-
Part A
1 Become familiar with the area to be inventoried
2 Prepare a detailed work schedule e g identifying when
contacts are to be made, dates of site visits and
locations etc
3 Prepare a sample "survey form" for Authority comment,
prior to initiation of the User Survey
Part B
4 Identify which areas are used for nesting/feeding/loafing
by the gulls Do the same for the Canada Geese
5. Determine the types of problems created by the gulls/geese
and the magnitude/seriousness of the problem e g begging,
fowling, economic damage, danger to human life/health, etc
6 Identify similarities and differences between inland and
waterfront sites
7 Progress meeting with consultant and the Authority
8 Describe the how, why and where of the proliferation of
gull~/geese in recent years, including an explanation of
differences between gull species t.e Ring-billed Gulls
vs Herring Gulls Document information for the waterfront
in general and Aquatic Park specifically
Part C
9 Based on Part B, identify the ramifications, if any, if the
gulls/geese remain unman aged over the next 5 to 10 years
Document information in general and Aquatic Park
specifically
Also, with specific reference to Aquatic Park identify,
territorially speaking, what areas of Aquatic Park,
including the dredgeate endikements, would be utilized by
the birds and/or abandoned in favour of more desirable sites
Further, if the Ring-billed Gulls remain uncontrolled at
Aquatic Park what impact would occur for other species on
the site.
10 Determine the possibility, type and extent of possible human
health problems from major die-offs, water quality
impairment, etc Document information for the waterfront
in general and Aquatic Park specifically
With specific reference to Aquatic Park, examine the local
Health Unit water quality data for the last 10 years for
Cherry Beach and the Aquatic Park Beach
/5
B-2l6
-5-
11 Describe the major methods (pros and cons) for the management
of the birds
With specific reference to Aquatic Park, suggest specific
management practices to prevent the birds from nesting on
the dredgeate endikement lands and identify the areas best
suited for nesting gulls or gull sanctuary in the area north
of the main spine road
12 Prepare a draft report of the study findings and submit to
the Authority for comment
13 Meet with the Authority to discuss comments
14 Finalize report as required and submit
8.,..2l7
-6-
TERMS OF ENGAGEMENT
1. The study is to run for a period not to extend beyond
5 months from the initiation date, which is deemed to
be when all necessary approvals have been received.
2. Details of the proposed work schedule, any surveys and
user survey forms will be submitted to the Authority
for approval prior to initiation or implementation.
3 A progress meeting is required midway through the study
(Part B, Step 7)
II A draft report is to be submitted to the Authority for
comment, no later than 2 weeks prior to the end of the
term The draft is to be revised to the extent required
ana-the report finalized
5 MTRCA requires two copies of interim documents, graphics
and reports
6 At the completion of the study, the consultant will submit
to the Authority one set of all original material for use
by the Authority as it deems fit. The original fina~
document is to be suitable for reproduction at 8-1/2 x 11
The siz.e of graphics is negotiable with the Authority
7 The consultant will invoice the Authority on two occassions
once after Part B, Step 6, and the final at completion of
the study
NOTE All materials and documents, as a result of this study,
are the property of the Authority and sanction of its
use outside the guidelines of this study, require
Authority approval
1983 05.25
JD/ fs
(J) tJl
() I
:J: N
t>l .....
t:l 00
C
t"'
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY t>l
DIVISIONAL EXPENDITURE SUMMARY t:l
FOR THE PERIOD MAY 1, 1983 TO MAY 31, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $ $
Finance & Admin. (inc1 Land Acq ) 3,186,465 169,539 1,057,785 2,128,680 33.2
Water Resource - Flood Control 2,911,389 167,361 819,798 2,091,591 28.2
Water Resource - Waterfront 2,325,000 123,202 314,516 2,010,484 13.5
Conservation Land Management 3,548,345 245,156 1,231,579 2,316,766 34 7
Information & Education 2,426,623 164,322 800,175 1,626,448 33 0
Historical Sites 3,912,822 160,756 716,084 3,196,738 18 3
Vehicle & Equipment - Capital Acq. 280,730 8,441 73,694 207,036 26 2
SUB-TOTAL 18,591,374 1,038,777 5,013,631 13,577,743 27.0
Vehicle & Equipment - Operations -- 16,304 95,846 -- --
Special Projects -- 42,593 234,624 -- --
C.O.E.D. 1983/84 2,123,808 105,093 133,875 1,989,933 6.3
Food Services 833,317 104,467 216,410 616,907 26.0
TOTAL 21,548,499 1,307,234 5,694,386 -- --
=====================================================================
c... B-2l9
,
the metropolitan toronto and region conservation authority
minutes
EXECUTIVE COMMITTEE 29-JUNE-1983 ill/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, June 29, 1983.
PRESENT
Chairman Mrs. F. Gell
Vice Chairman E.V. Kolb
Members W.G. Barber
M.W.H. Biggar
E. Fulton
Mrs. L. Hancey
H.C. Lawrie
S.A. Macpherson
Ms. S. Nimmo
J.S. Scott
Mrs. N. Stoner
Authority Member J.A. Bryson
MINUTES
Res. U66
Moved by S.A. Macpherson ~
Seconded by: W.G. Barber
THAT the Minutes of Meeting ill/83 be approved.
CARRIED.
DECLARATIONS
W.G. Barber declared conflict of interest on item SA (8) .
SECTION I
NO ITEMS
SECTION II
FOR INFORMATION
1- CORRESPONDENCE
Mr. W.A. McLean, Acting General Manager, reported receipt of the following
correspondence:
Letter from Karen Lynch, Celebration Committee Co-ordinator, Toronto
International Festival 1984, requesting that a speaker from Toronto
International Festival be granted permission to address the Authority at
Meeting is on the morning of October 14, 1983, to inform the members of the
many events scheduled to celebrate the city's lsOth birthday and the
bicentennial of the province of Ontario.
Res. U67 Moved by Mrs. N. Stoner
Seconded by: H.C. Lawrie
THAT a speaker from Toronto International Festival 1984 be invited to
address Authority Meeting is to be held on October 14, 1983.
CARRIED.
- 2 -
B-220
2. APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Application listed on the Agenda for this meeting as item A (10) was
withdrawn at the request of staff prior to the meeting.
Res. #168 Moved by Mrs. L. Hancey
Seconded by: S.A. Macpherson
THAT the applications listed herein as A(l) to A(9) inclusive and A(ll), be
approved, subject to the conditions contained in the reports.
CARRIED.
A(l) The Town of Caledon
To alter a watercourse north of Hickman Street and west of
Glasgow Road in the Village of Bolton, Town of Caledon (Humber River
Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
Site Plan and Cross-Section prepared by the Town of Caledon.
A(2) Dustup Development Limited
To alter a watercourse and place fill in a regulated area east of
Bathurst Street and north of Major Mackenzie Drive in the Town of
Richmond Hill (Don River Watershed)
In accordance with the following documents and plans, which shall form part
of the permit
Drawings 10, 16 and 30, Project No. 8l-ES-648, prepared by Fred
Schaeffer and Associates Limited and dated April 1982.
A(3) The Borough of Scarborough
To line with concrete section of East Markham Branch of the Highland
Creek, east of McCowan Road from C.P.R. crossing to Nugget Avenue and
to replace culvert under the C.P.R. with one of a larger size
(Highland Creek Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
Drawings 1 to 10 inclusive of Project 434C prepared by ChiSholm,
Fleming & Associates and dated November, 1982.
A(4) John & Bettyann Allison
To build second storey addition to dwelling at #15 Meadowbrook Lane,
Unionville, Town of Markham (Rouge River Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
A site plan and elevation plan prepared by the applicant illustrating
the location and dimensions of the proposed addition.
- 3 -
B-22l
A(s) Raylene Murphy
To build addition at rear of i209 Main Street, Unionville, Town of
Markham (Rouge River Watershed)
In accordance with the following documents and plans, which shall form part
of the permit
A site plan entitled "Jug and Basin Addition", drawing i3, dated
May 18, 1983, and amended by the applicant on June 7, 1983, to remove
the parking lot and associated fill at the rear of the subject lot.
A(6) D.L. Howes
To place rip rap on the outside curve of the Duffin Creek immediately
north of the Eighth Concession Line to stabilize the creek bank at an
existing bridge across the creek (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form part
of the permit
A sketch of the proposed work prepared by the applicant.
A(7) The Regional Municipality of Durham
To reconstruct Regional Road 5 from Side Line 12 to 1500 ft. west of
Balsam, on Lots 6 to 12, between Concessions 8 and 9, Town of
Pickering (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
(a) Drawings P-83-l32 to P-83-l40 inclusive, prepared by the Region of
Durham and dated April, 1983.
(b) Several Standard Drawings by the Ministry of Transportation and
Communications which form part of the Region's application.
A(8) Bell Canada
To replace deteriorated telephone cable with new cable, Regional Road
5 on Part of Lot 8, between Concessions 8 and 9, Town of Pickering
(Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
Plan RW iI, Order ils9678, prepared by Bell Canada and dated
June 3, 1983.
A(9) Donald L. Raymer
To place fill at rear of #145 Chesterton Shores, Borough of
Scarborough (Lake Ontario Waterfront)
In accordance with the following documents and plans, which shall form part
of the permit
Drawings and correspondence accompanying the application.
- 4 -
B-222
A(ll) Town of Markham
To construct two footbridges over Bruce's Creek in the Village of
Unionville, Town of Markham (Rouge River Watershed)
In accordance with the following documents and plans, which shall form part
of the permit:
(a) Plan ES and B-7602s-Bl;
(b) Specifications for prefab footbridge.
3. TORONTO AREA WATERSHED MANAGEMENT STRATEGY STUDY (TAWMS)
Results of the 1981 Proqress Report
Res. #169 Moved by: M.W.H. Biggar
Seconded by: H.C. Lawrie
THAT the staff report on the 1981 results of the Ministry of the
Environment's "Toronto Area Watershed Management Strategy Study" be
received.
CARRIED.
4. MIMICO CREEK HYDROLOGY REVIEW STUDY
Res. #170 Moved by M.W.H. Biggar
Seconded by: S.A. Macpherson
THAT the request by M.M. Dillon Limited for an additional $5,000.00 for the
Mimico Creek Hydrblogy Review Study be approved;
AND FURTHER THAT the approval of the Minister of Natural Resources be
requested.
CARRIED.
-
5. POTTERY ROAD SNOW DUMP
Res. un Moved by H.C. Lawrie
Seconded by M.W.H. Biggar
THAT approval be given to the City of Toronto for the disposal of snow at
the Pottery Road site, for the 1983-84 season;
THAT the approval be subject to the terms and conditions as set out by the
Metropolitan Toronto Department of Parks and Property;
AND FURTHER THAT staff be directed to consult with the City of Toronto and
the Metropolitan Toronto Department of Parks and Property on a properly
constructed snow dump.
CARRIED.
6. REQUEST FROM THE CITY OF NORTH YORK FOR A SANITARY SEWER EASEMENT
Res. U72 Moved by J.S. Scott
Seconded by: M.W.H. Biggar
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the City of North York to grant a permanent
easement across Authority-owned land required to facilitate a sanitary sewer
in the Finch Avenue east of Jane Street area;
- 5 -
B-223
AND WHEREAS it is the opinion of the Authority that it is in the best
interests of the Authority in furthering its objectives as set out in
Section 20 of the Conservation Authoriti~s Act to co-operate with the City
of North York in this instance;
THAT a Permanent Easement containing 0.330 acres, more or less, be granted
to the City of North York for a sanitary sewer located south of Finch
Avenue, east of Jane Street, said land being Part of Lot 20, Concession 4,
W.Y.S., City of North York, Municipality of Metropolitan Toronto,
designated as Part 2 on Plan MX-105. Consideration to be the nominal sum
of $2.00 plus all legal, survey and other costs;
THAT said Easement be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act, R.S.O.
1980, Chapter 85 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED.
7 WATERFRONT PROJECT 1983: ETOBICOKE SECTOR
COLONEL SAMUEL SMITH WATERFRONT PARK: BULLDOZER RENTAL
Res. ~173 Moved by: Mrs. N. Stoner
Seconded by: E. Fulton
THAT the contract for the supply of a rental crawler-mounted tractor
bulldozer with operator be awarded to R.C. Contracting Limited for the
tendered rate of $25.00 per hour for the period July 11, 1983 to December
31, 1983, it being the lowest proper tender.
CARRIED.
8. SHORELINE MANAGEMENT PROGRAM: SCARBOROUGH SECTOR
SOUTH MARINE DRIVE: GEOTECHNICAL INVESTIGATION
Res. #174 Moved by: E. Fulton
Seconded by: M.W.H. Biggar
THAT the firm of Geocon Inc. be retained to complete the detailed
geotechnical design of the proposed shoreline protection measures at South
Marine Drive on a per diem basis for a fee not to exceed $30,000.00.
CARRIED.
9. 1983 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM
TERMS OF REFERENCE AND CONSULTANTS' TENDERS
Res. 1175 Moved by: M.W.H. Biggar
Seconded by: J.S. Scott
THAT Proctor and Redfern Limited be retained at an upset cost of $33,854.00
to undertake the waterfront environmental monitoring analyses as described
in the Terms of Reference entitled "Terms of Reference for the Waterfront
Monitoring Program 1983", it being the lowest proper tender;
AND FURTHER THAT approval for the Terms of Reference be requested from the
Ministry of Natural Resources.
CARRIED.
- 6 -
B-224
10. INDIAN LINE CAMPGROUND: TURNING CIRCLE AND PARKING LOT
Res. U76 Moved by: Mrs. L. Hancey
Seconded by: W.G. Barber
THAT the quotation received from King City Paving for approximately
1500 square yards of asphalt paving, in the sum of $10,800.00 be accepted,
it being the lowest quotation received.
CARRIED.
ll. INDIAN LINE RESIDENCE/CONTROL BUILDING: LABOUR AND MATERIALS
Res. U77 Moved by: E. Fulton
Seconded by: Ms. S. Nimmo
THAT the quotations for the supply of the major construction components
and labour/supervision for the construction of the Indian Line Campground
residence, be accepted as follows, they being the lowest acceptable
quotations received:
C.T.M. for supply of labour/supervision $11,480.00
Card Lumber for supply of 2"x4", 2"x6", 2"x8"
and drywall 1 , 77 5 . 0 0 + PS T
Custom for supply of insulation 849.00 + PST
Thornlea for supply of plywood and shingles 1,825.00 + PST
Argo for supply of concrete blocks 2,458.00 + PST
C.B.M. for supply of concrete 1,147.14 + PST
CARRIED.
12. .ALBION HILLS WASHROOM/SHELTER: LABOUR AND MATERIALS
Res. U78 Moved by: Mrs. L. Hancey
Seconded by: M.W.H. Biggar
THAT the quotations for the supply of the major construction components
and labour/supervision for the construction of the Albion Hills
Conservation Area washroom/shelter complex, be accepted as follows, they
being the lowest acceptable quotations received:
C.T.M. for supply of labour/supervision $23,515.00
Card Lumber for supply of major lumber component 2,107.20 + PST
Hanford for supply of 4"xlO" & 4"x12" D.Fir 1,964.68 + PST
Thorn1ea for supply of shingles & insulation 1,637.46 + PST
Argo for supply of concrete block 5,338.59 + PST
C.B.M. for supply of concrete 1,147.14 + PST
CARRIED.
13. REPORT il/83 - FOOD SERVICES SOS-COMMITTEE
Res. #179 Moved by: E. Fulton
Seconded by: E.V. Kolb
THAT the staff be authorized and directed to purchase additional food
service equipment, furniture, smallwares, mobile catering equipment, and
to carry out necessary repairs and improvements at the food service
outlets, to a maximum of $10,000.00, if required;
AND FURTHER THAT the report on the management of the Food Services
Equipment Fund, dated March 29, 1983 , as appended as Schedule "An of these
Minutes, be adopted as policy for the operation and management OL the
fund.
CARRIED.
- 7 -
B-225
14. PAINTING: ADMINISTRATION HEADQUARTERS
Res. #180 Moved by Mrs. L. Hancey
Seconded by W.G. Barber
THAT the quotation of Benwood Painting Contractors Co. Ltd., in the amount
of $7,540.00, for the painting of the interior of the Authority
Administration Headquarters, at 5 Shoreham Drive, be approved, being the
lowest quotation received;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of any additional approvals that may be required.
CARRIED.
l5. REVIEW OF ORGANIZATION AND MANDATE
Res. tl8l Moved by: J.S. Scott
Seconded by: S.A. Macpherson
THAT the Report on the Review of Organization and Mandate, concerning Terms
of Reference and both Policy and Project Steering Committees be received;
AND FURTHER THAT the Executive Committee concur in the action taken by the
Chairman.
CARRIED.
NEW BUSINESS
l6. CITY OF SCARBOROUGH
The Chairman extended through Mr. Ed. Fulton congratulations to the new
City of Scarborough.
17. BLACK CREEK PIONEER VILLAGE - MIRACLE MART BAGS
Mr. Biggar expressed the hope that a follow-up will be done on the
advertising of Black Creek Pioneer village on Miracle Mart bags as there
has been an expression of interest by Miracle Mart. The Chairman advised
Mr. Biggar and anyone else interested in this to get in touch with
Mrs. Edna Gardner who is looking into the matter.
18. DON VALLEY WATERSHED TOUR
Mrs Hancey expressed her appreciation for the excellent work done by the
staff on the Don Valley Watershed Tour,particularly that of Mr. W.A. McLean
and Mrs. Alyson Deans. Ratepayer groups were invited on this tour, and 15
groups each sent two representatives, all of whom gained a better
appreciation of the work being done by The Metropolitan Toronto and Region
Conservation Authority
19. SCARBOROUGH TOUR
Mr. Barber expressed his thanks to Ed Fulton and Roger Brown of the City of
Scarborough for the tour which took place June 23rd, and appreciation to
the Chairman and members of the Authority who made it a success.
- 8 -
B-226
20. R.D.H.P.C. ADVISORY BOARD MEETING AND TOUR
Mrs. Stoner stated that Dr. Walter Tovell had given a very interesting
presentation on the Report of the Reorganization Committee at the
R.D.H.P.C. Advisory Board meeting on June 9th. Mrs. Stoner also expressed
appreciation to the staff for the excellent tour which followed the
meeting.
2l. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
(a) Ms. Nimmo, on behalf of the Official Opening Sub-Committee for the Black
Creek Pioneer Village Visitor Centre, confirmed that the ground breaking
ceremony will take place on August lO, following the Executive Committee
Meeting, not on July 29 as previously stated.
(b) The Secretary-Treasurer informed the Committee that $140,000.00 has been
received to date from the McNair Estate and that a further payment is
expected around the middle of July.
22. C.O.E.D.
The Secretary-Treasurer informed the Committee that the Authority has
received a cheque for $431,000.00 from the Federal Government for the above
project, and that staff has been assured that the Province of Ontario
portion will be received in the next few weeks.
23. TERMINATION
ON MOTION, the meeting terminated at 10.40 a.m. and members were invited to
attend the Black Creek pioneer Village Visitor Centre Building
Sub-Committee Meeting to follow.
Mrs. F. Gell Warren E. Jones
Chairman Secretary-Treasurer
em
SCHEDULE "A"
FOOD SERVICES EQUIPMENT FUND
1. The Food Serviqes Equipment Fund is to apply to the
refreshment facilities of all Conservation Areas, Black
Creek Pioneer Village, Half Way House and the Kortright
Centre for Conservation.
The replacement or repair of all the food services
equipment at the Albion Hills, Boyd, Lake St. George
and Claremont Conservation Field Centres will not be
funded from this account.
2. The account will be used for the replacement or repair
of all existing food services related equipment and
furnishings for the facilities included in the account.
In this regard, the following guidelines will apply:
(a) Routine repairs and maintenance will be funded
from Operations, rather than the Food Services
Equipment Account;
(b) Repairs in lieu of replacement, replacement,
betterment and improvements will be funded
through the account;
(c) Betterment/improvement is defined as an increase
in capacity of the asset or an extension of the
life of the asset beyond the point that could
ordinarily be achieved through regular and
routine maintenance and repairs.
3. All withdrawals from the account will be on the recommendation
of the Food Services Steering Committee and approved by the
Secretary-Treasurer or his designate and will be subject to
adherence to the Authority's Purchasing Policy as it exists
or as it may be amended.
4. Prior to the completion of the preliminary budget process
for the 1984 Budget, the General Manager, in consultation
with the Food Services Steering Committee and Secretary-
Treasurer, will make a recommendation concerning the means
by which the operating fund will contribute to the Food
Services Equipment Fund. Such contribution will be based
on a percent~ge of gross sales or equivalent criteria.
5. The replacement of consumable equipment and materials,
breakages, repairs, new food service facilities and
renovations will not be funded from the Food Services
Equipment Fund.
1983.03.29
WAM/mm/mrp
~. B-228
,
the metropolitan toronto and region conser/ation authority
minutes REPORT #12/83
EXECUTIVE COMMITTEE 13-JUI.Y-l983 #12183
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 13 July, 1983
PRESENT
Chairman Mrs F E Gell
Members W.G. Barber
M.W H Biggar
(For Ms S. Nimmo) J A. Bryson
E. Fulton
Mrs I.. Hancey
H.C. Lawrie
S A Macpherson
(For Mrs. N. Stoner) Mrs. M Prinsloo
J S Scott
ABSENT
Ilice-Chairman E.V. Kolb
Members Ms. S Nimmo
Mrs. N. Stoner
MINUTES
Res #182 Moved by: W.G. Barber
Seconded by M.W.H. Biggar
< '
THAT the Minutes of Meeting #11/83 be approved.
CARRIED.
SECTION I
NO ITEMS
SECTION II
ITEMS FOR INFORMATION
l. APPI.ICATIONS FOR PERMIT UNDER ONTARIO REGUI.ATION 1 TO
Res. #183 Moved by:- Mrs. I.. Hancey
Seconded by M'.W..H. Biggar ,.
THAT the applications listed herein as A(l) to A(4) inclusive, be. approved,
subject to the conditions contained in the reports
CARRIED.
A(ll Town of' Pickering-
To al ter a watercourse and. place fill in' the Vistula Drive. Ravine-,
between Vistula Drive and Bayly Street., east of West. Shore. Blvd.,
(Waterfront) ~-
-
In accordance with the following documents and plans, which shall form
part of the permit
Project #82~20 I l2, Drawing #1, prepared. by Cosburn Patterson &
Associates Ltd. and dated June, 1983.
B-229 -2-
A (2) City of Scarborough
To place fill in regulated area and build storm sewer outfall in
flood-vulnerable area at foot of Starspray Blvd , south of C N R ,
(Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
Reference No 77-ES-4ll, Drawing #70, prepared by
Fred Schaeffer & Associates Ltd and dated April, 1983
A(3) Town of Richmond Hill
To alter watercourse south of Elgin Mills Road, east of
Bayview Avenue, Town of Richmond Hill
(Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #14-04-PP l, 2, 3, and 4, da\.ed June, 1983
A(4) Town of Richmond Hill
To alter watercourse east of Yonge Street, north of Sixteenth Ave ,
Town of Richmond Hill (Rouge River Watershed)
Subject to
(a) All work being done in accordance with Drawings 1 to 19, Project
#82029, prepared by Cosburn Patterson & Associates Ltd , and
dated April, 1983,
(b) The Authority receiving a copy of the easement agreements between
the Town of Richmond Hill and the affected landowners,
(e) The Authority receiving from the Town of Richmond Hill written
confirmation that the Town intends to ensure that individual
property owners comply with the flood plain modifications
required as per drawings forming part of the permit
Res #l84 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the applications listed herein as A(5) to A(12) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
.
A(S) Mr Mike Giampaola
To construct two clear span steel and concrete bridges across the
Salt Creek, east of Airport Road, north of the 5th Line, Town of
Caledon (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings #1 to #4 inclusive, prepared by Joseph Condido and
dated May, 1983
A(6) Town of Vaughan
To undertake channel improvements and construct low-flow channel
along the Jersey Creek from Ainsley Grova Road westerly to
Aberdeen Avenue (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing Project No 83-3027
-3- B-230
A(7) Sunny Park Developments Limited
To construct storm and sanitary sewer outlets, south of Green Lane
and west of Don Mills Road, Town of Markham
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
Project #M81-ES-629, Drawing Nos. 1, 2, 3, 9, 12, and 16, as
prepared by Fred Schaeffer & Associates Ltd.
A(8) Sausik, Reyn, Roman
To place fill at Nos. 309, 313, and 317 Westpoint Avenue,
City of Scarborough (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
A site plan as prepared by the owners, dated July, 1983 and
entitled "Project Re: Lots 66, 65, 64 - Plan 284."
A(9) The Municipality of Metropolitan Toronto
Parks & Property Department
To construct parking lot in Kingsmill Park, vicinity of the
Old Mill, Borough of Etobicoke (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
A landscape sketch entitled "Kingsmill Parking Lot near Old Mill",
as prepared by The Municipality of Metropolitan Parks & Property
Department, and dated July, 1983.
A(10) Humberview Motors Inc. ,
To construct addition to structure, north side Bloor Street,
immediately east of the Mimico Creek, City of Etobicoke
In accordance with the following documents and plans, which shall form
part of the permit:
Drawing # SK 1, Project 8301, as prepared by Galrich Contracting
Ltd. , and dated 1983.02.07.
A(11) Dr. Bernard Balshin
To rehabilitate and stabilize side slopes at rear of
#19 Riverside Crescent, City of Toronto,
(Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
(a) Preliminary Drawing #L2-r, as prepared by Terraplan Landscape
Architects, dated March, 1983;
(b) Geotechnical Investigation Report prepared by L.J. Rak Engineering
Ltd. , and dated March, 1983.
A(12) Town of Vaughan
Parks & Recreation Department
To construct a timber-edge boccie court in Glen Shields Park,
west of Dufferin Street, north of Clen Shields Avenue
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
Site Plan entitled, "Glen Shields Bocci Courts", Job #PR83-16,
dated June, 1983, as prepared by the Town of Vaughan Parks &
Recreation Department.
B-23l -4-
2 REPORT #2/83 - FLOOD CONTROL AND WATER
CONSERVATION ADVISORY BOARD
Res #l85 Moved by H C Lawrie
Seconded by J S Scott
THAT The Metropolitan Toronto and Region Conservation Authority adopt the
position that the Storm Water Management Plan for OPA 6 be implemented
prior to, or concurrent with, approval of any further development in the
OPA 6 area of Brampton
CARRIED
3 SAVE OUR STREAMS INCORPORATED
-Projects 1983
Res #l86 Moved by Mrs I. Hancey
Seconded by W G Barber
THAT the staff of the Authority co-operate with Save Our Streams Incorporated
in the development and construction of stream improvement works on selected
sites within the Authority's watershed
CARRIED
4 BRUCE'S MILL CONSERVATION AREA
-Grist Mill Restoration Engineering Services
Res #l87 Moved by M W H Biggar
Seconded by J A Bryson
THAT the consulting firm of Svihra & Associates be retained, at an upset
limi t of $4,000 00, to prepare a structural engineering report, detailing
necessary remedial works to be undertaken on the grist mill in the
Bruce's Mill Conservation Area,
AND FURTHER THAT Mr William Trick, P Eng , be retained, at an upset limi t
of $4,300 00, to provide technical support to Svihra & Associates to ensure
that the placement of the new support footings is compatible with the
operation of the drive layshafts of the building
CARRIED
5 OFFICIAL OPENING BOLTON CHANNEL
Res #l88 Moved by J S Scott
Seconded by H C Lawrie
THAT the Chairmen of the Humber Valley, Flood Control and Water Conservation,
and the Information & Education Advisory Boards be appointed a committee to
make the necessary arrangements for the Official Opening of the Bolton
Channel
CARRIED
6 EARL BALES PARK
-Proposed Outdoor Theatre
Res #l89 Moved by M W H Biggar
Seconded by Mrs L Hancey
THAT the Executive Committee advise The Municipality of Metropolitan Toronto
Parks & Property Department that it has no objection to the amendment of the
Earl Bales Park Master Plan to include an Outdoor Theatre,
THAT the proposed site of the theatre lies outside the area subject to
regulation by the Authority,
AND FURTHER THAT Metropolitan Toronto be requested to make provision in their
construction techniques and detailed design of the proposed structure to
protect the adjacent valley wall from potential erosion during and after
construction
CARRIED
I
\
-5- B-232
7 MAPLE DISTRICT LAND USE GUIDELINES
Res #l90 Moved by Mrs L Hancey
Seconded by W G Barber
THAT the Maple District Land Use Guidelines be received,
AND FURTHER THAT the staff continue to work in co-operation with the Ministry
of Natural Resources in the accomplishment of related program goals and
objectives
CARRIED
8 REPORT #l/83 _ BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
BUILDING SUB-COMMITTEE
Res #l91 Moved by E Fulton
Seconded by M W H Biggar
THAT Report #1/83 of the Black Creek Pioneer Village Visitor Centre Building
Sub-Committee be received,
THAT final drawings and tender documents be available July 25, 1983,
THAT advertisement of the tender be placed one week prior to receipt of final
drawings and documents,
THAT tenders be opened Wednesday, August 17, 1983,
AND FURTHER THAT a recommendation re awarding of the tender be considered by
the Executive Committee on August 31, 1983, or sooner if required
CARRIED
NEW BUSINESS
9 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
-Ground Breaking Ceremony
Res #l92 Moved by M W H Biggar
Seconded by Mrs L Hancey
THAT, due to delays in the tendering process for the Black Creek Pioneer
Village Visitor Centre, Item 2l(a) of the Minutes of Executive Committee
Meeting #11/83 __ referring to the date of August 10, 1983, for the
Ground Breaking ceremony -- be returned to the sub-committee for further
consideration
CARRIED
lO EXECUTIVE COMMITTEE MEETING SCHEDULE 1983
-Amendments
Res #l93 Moved by Mrs L Hancey
Seconded by J S Scott
THAT the following changes be made in scheduled Executive Committee meetings
CANCEL meetings scheduled for September 7 and 2l
RE-SCHEDULE meetings to August 3l and September l4
CARRIED
11 TERMINATION
On motion, the meeting terminated at 11 05 a m , July 13
Florence Gell W E Jones
Chairman Secretary-Treasurer
KC
~ B-233
,
the metropolitan toronto and region conservation authority
minutes REPORT #l3/B3
EXECUTIVE COMMITTEE lO-AUGUST-l983 #13/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 10 August, 1983
PRESENT FOR THE HEARING
Chairman Mrs. F E Gell
Vice-Chairman E.V. Kolb
Members W.G Barber
Mrs. I. Hancey
H C. I.awrie
(For E. Fulton) W.G McLean
Ms. S. Nimmo
J S. Scott
Mrs N. Stoner
HEARING
Following the roll call, the meeting recessed to hold a hearing re
Mr. George Hinder
City of North York
Don River Watershed
.
PRESENT FOR THE MEETING
Chairman Mrs F.E Gel!
Vice-Chairman E V Kolb
Members W G Barber
M W H. Biggar
Mrs L Hancey
H.C. Lawrie
(For E. Fulton) W.G. McI.ean
Ms S. Nimmo
J.S Scott
Mrs. N Stoner
ABSENT
Members E. Fulton
S.A. Macpherson
MINUTES
Res. #l94 Moved by J.S. Scott
Seconded by M.W.H. Biggar
THAT the Minutes of Meeting #l2/B3 be approved
CARRIED.
DECI.ARATIONS
MR W G BARBER declared a Conflict of Interest regarding Items l-A(l2) and
l-A(13) herein, and did not participate in discussion or vote on these items
SECTION I
NO ITEMS
B-234 -2-
SECTION II
ITEMS FOR INFORMATION
l. APPI.ICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res. #l95 Moved by Mrs. I.. Hancey
Seconded by: M.W H Biggar
THAT the applications listed herein as A(l) to A(l6) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED.
A(l) The Municipality of Metropolitan Toronto
To construct culvert on tributary of the Humber River, north side
Eglinton Avenue, west of Royal York. Road (City of Etobicoke)
In accordance with the following documents, which shall form part of the
permit
Drawing #PDB-962, Sheet 1 of 6, as prepared by the City of
Etobicoke
A(2) Town of Ajax -
To construct Rotherglen Road crossing of the Miller's Creek,
south of Highway #2 (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Contract #A83-35, prepared by Proctor & Redfern I.td , and
including the following drawings
Al-82704-Gl, dated June, 1983
Al-82074-Pl, dated June, 1983
Al-82074-P2, dated June, 1983
Al-82074-Bll, dated February, 1983
Al-82074-B12, dated February, 1983
A(3) Mr Michael Kalimin
To construct in-ground swimming pool at rear of #l79 Edenbridge
Dri ve , City of Etobicoke (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A plot plan and cross section, as prepared by Michael Kalimin
and Mary Kalimin, and attached to the application
A(4) Town of Markham
To build sanitary manhole and sewer connection, end of Princess
Street, west of Highway #48, Town of Markham (Rouge River
Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) File #549-04-Al-03093, Drawing #ll, dated June 1983, by
Gore & Storrie I.td.,
(b) File #549-04-Al-03095, Drawing #l3, dated June 1983, by
Gore & Storrie Ltd
(c) Correspondence relating to the easement, in the name of
Markham, over Authority lands
.
-3- B-235
A(5) Town of Markham
To construct storm sewer outfall east of Warden Avenue, south of
Highway #7 (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) Project #lO-82075, Drawing #2, issued July 1983, by
Marshall Macklin Monaghan Ltd. for the Town of Markham,
(b) Project #10-82075, Detail of the Concrete Headwall and
Energy Dissipator I.ayout, dated July 1983, by
Marshall Macklin Monaghan Ltd .
(c) Project #lO-82075, Design of Energy Dissipator, dated
July 1983, by Marshall Macklin Monaghan I.td.
A(6) Joskamp Limited
To build structure at #4600 Highway 7, Unionville, Town of
Markham (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) Topographical Plan of Survey of the subject lands, dated
May 4, 1983, by R G McKibbon I.td., showing the proposed
building and site development,
(b) Elevations of the proposed building, dated July 8, 1983,
by A B. Woodmansey, P Eng ,
(c) A site plan, floor plan, and elevations accompanying the
application
A(7) Monarch Construction I.td
To construct road within Regional Flood plain of the Bruce Creek,
east of Kennedy Road, north of Carlton Road, Town of Markham
(Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing PllA, dated April 1983, by Cole Sherman
A(8) Town of Markham
To construct storm water management pond just north of l6th
Avenue, east of Woodbine Avenue (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Project #lO-82075, Drawings lB and 2B, dated May 1983, by
Marshall Macklin Monaghan I.imited
A(9) City of Brampton
To construct pedestrian bridge across the Mimico Creek, south
of North Park Drive, east of Bramalea Road
In accordance with the following documents and plans, which shall form
part of the permit
Sheets 4 & 5, Drawing #83-53, prepared by F J Reinders &
Associates Limited. and dated July 1983
B-236 -4-
A(lOl Mr Donald I. Raymer
To place fill at #l45 Chesterton Shores, City of Scarborough
(Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings and correspondence accompanying the application.
A(ll ) Mr. Ninko Novakovic,
To place fill at north-west corner Highway #27 and Rutherford Road,
Town of Vaughan (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan and cross section dated June 20, 1983
A(l2 ) Bell Canada
To construct conduit across the Don River, south of Mill Street,
west of Trench Street, Town of Richmond Hill
In accordance with the following documents and plans, which shall form
part of the permit
(a) Standard Drawing #95l,
(b) Plan #402, I.ocation Code 594209, Order #956397, dated
June 24, 1983
A(13 ) Bell Canada
To construct two crossings of the German Mills Creek, east of
Maple Avenue, south of Duncan Road, Town of Richmond Hill
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Plan RW No l, Location Code 594255, Order #3592l2, dated
July 13, 1983
A(l4 ) Glen Shields Estates
To re-grade area of flood plain, west side Dufferin Street, north
of Steeles Avenue, Town of Vaughan (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #8308-B-l, Grade Control Plan, as prepared by
Paul Theil Associates I.td
A(15) The Municipality of Metropolitan Toronto
To place fill for re-location of two greens at the Humber Valley
Golf Course, City of Etobicoke (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #Gl, as prepared by Thomas McBroom Associates Limited
-5- B-237
A(l6) Dr Norman Kassabian
To place fill at rear of #327 I.ake Promenade, City of Etobicoke
(Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
(a) All work to be carried out in accordance with the detailed
construction Drawings PI, dated January 4, 1983, PIA, dated
May 30, 1983, P9, dated April l8, 1983, PlO, dated July lO,
1983, PlOA, dated May 26, 1983, and Pll, dated April l8,
1983,
(b) The Authority is to be notified at least 24 hours prior to
commencement of back-filling behind the concrete wall
2. REHABILITATION OF THE PAI.GRAVE DAM, TOWN OF CALEDON
Res. #l96 Moved by Mrs I. Hancey
Seconded by Mrs. N. Stoner
THAT Report #2/83 of the Tender Opening Sub-Committee, as appended as
Schedule "A" of these Minutes, be received,
THAT the contract for the rehabilitation of the Palgrave Dam on the
Humber River, Town of Caledon, be awarded to Massi Construction Co Ltd ,
in the amount of $38,45l 00,
AND FURTHER THAT a contingency item be included, which would increase the
total amount for the project to $42,296.00
CARRIED.
.
3 THE MUNICIPAI.ITY OF METROPOLITAN TORONTO
-Request for permanent easement east of Islington Avenue, south of
Finch Avenue, City of North York
, (Humber River Watershed)
Res #l97 Moved by Mrs N. Stoner
Seconded by W.G. Barber
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from The Municipality of Metropolitan Toronto to grant
a permanent easement across Authority-owned land required to facilitate a
sanitary sewer, east of Islington Avenue, south of Finch Avenue,
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act, to co-operate with
The Municipality of Metropolitan Toronto in this instance,
THAT a permanent easement containing 0.228 acres, more or less, be granted to
The Municipality of Metropolitan Toronto for a sanitary sewer located east of
. Islington Avenue, south of Finch Avenue, said land being Part of Lot 20,
Concession VI, W Y S., City of North York (The Municipality of Metropolitan
Toronto), designated as Part 1 on Plan 64R-9846 Consideration to be the
nominal sum of $2 00, plus all legal, survey, and other costs,
THAT said easement be subject to an Order-in-Council being issued in accord-
ance with Section 2l(c) of The Conservation Authorities Act, R.S.O 1980,
Chapter 85 as amended,
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
B-238 -6-
4 MINISTRY OF GOVERNMENT SERVICES
-Request for Authority-owned land Highway #427/Finch Avenue, City of
Etobicoke (Humber River Watershed)
Res. #l98 Moved by Mrs. N. Stoner
Seconded by M.W.H. Biggar
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Ministry of Government Services to grant a
conveyance of Authority-owned land for road purposes in the vicinity of
Highway #427 and Finch Avenue,
AND WHEREAS it is the opinion of the Authority that it is in the best interest
of the Authority, in furthering its objectives as set out in Section 20 of
The Conservation Authorities Act, to co-operate with the Ministry of
Government Services in this instance,
THAT a conveyance of 0.04 acres, more or less, be granted to the Ministry of
Government Services for road purposes in the vicinity of Highway #427 and
Finch Avenue, said land being Part of I.ot 36, Concession IV, F H , and part
of allowance for road adjoining the Indian I.ine, City of Etobicoke
(The Municipality of Metropolitan Toronto) Consideration to be the sum of
$2 00, plus all legal, survey, and other costs..
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 21(c) of The Conservation Authorities Act, R.S.O.
1980, Chapter 85, as amended,
ANB FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED.
5 I.AND ACQUISITION PROJECT 1982-1984: HIGHI.AND CREEK WATERSHED
-Property 541878 Ontario Corporation Ltd.
west side Cherrydale Court, vicinity Centennial/
I.awson Roads, City of Scarborough
Res. #199 Moved by H.C. I.awrie
Seconded by W.G. McI.ean
THAT the report (July 27, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase
CARRIED.
Re Project I.and Acquisition Project 1982-l984 - Flood
Plain & Conservation Land Component
Highland Creek watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property West side Cherrydale Court, vicinity of
Centennial/I.awson Roads
OWner 541878 Ontario Corporation I.td.
Area to be acquired 0 797 acres, more or less
Recommended purchase price $l,OOO 00, plus vendor's legal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of I.ot 50, Registered Plan 2732, City of
Scarborough (The Municipality of Metropolitan Toronto), located on the west
side of Cherrydale Court, in the vicinity of Centennial and I.awson Roads
"Negotiations have been conducted with the owner and its solicitor, Mr
Vic Angelson, Messrs. Cassels, Brock, Continental Bank Building, Suite 2300,
l30 Adelaide Street West, Tor<!lnto, M5H 3C2 and, subject to the approval of
your committee, agreement has been reached with respect to a purchase price,
as follows
-7- B-239
The purchase price is to be the sum of $l,OOO.OO, plus vendor's
legal costs, with date of completing the transaction to be as
soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-1l-401 - Flood I.and
Acquisition "
6 I.AND ACQUISITION PROJECT 1982-l984 ROUGE RIVER WATERSHED
-Property J F. Coughlan Construction Company Ltd
north side Highway #2, west of Altona Road,
Town of Pickering
Res #200 Moved by J S. Scott
Seconded by Mrs N. Stoner
THAT the report (July 28, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase
CARRIED.
Re Project I.and Acquisition Project 1982-1984 - Flood
Plain & Conservation I.and component Rouge
River watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property north side Highway #2, west of Altona Road
Owner J F. Coughlan Construction Company I.td
Area to be acquired 4 976 acres, more or less
Recommended purchase price $l2,500 00, plus payment of vendor's survey,
legal, and appraisal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lot 33, Range III, Broken Front
Concession, Town of Pickering (The Regional Municipality of Durham) , being a
partial taking from a larger property located on the north side of Highway #2,
west of Altona Road.
"Negotiations have been conducted with the owner and its solicitor,
Murray D. Stroud, 356 Kingston Road, Pickering, Ontario, I.lV lA2 and,
subject to the approval of your committee, agreement has been reached with
respect to a purchase price, as follows
The purchase price is to be the sum of $l2,500 00, plus payment
of vendor's survey, legal, and appraisal costs, with date of
completing the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements, are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-ll-401 - Flood Land
Acquisition "
B-240 -8-
7 SHOREI.INE MANAGEMENT PROGRAM SCARBOROUGH SECTOR
-South Marine Drive
Res. #20l Moved by W.G Barber
Seconded by Mrs I.. Hancey
THAT the firm F.J Reinders & Associates Ltd. be retained to prepare a
detailed design of the revetment alternative for shoreline protection along
South Marine Drive, Borough of Scarborough, at a fee not to exceed $12,400 00.
CARRIED
8. I.AND ACQUISITION PROJECT 1982-1984 I.AKE ONTARIO WATERFRONT
-Property Gerd Schwarzkopf
#5 Lakehurst Crescent, City of Scarborough
Res. #202 Moved by E.V. Kolb
Seconded by M W.H. Biggar
THAT the report (August 2, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase
CARRIED.
-
liRe Project I.and Acquisition Project - Lake Ontario
Waterfront Component Scarborough Sector
Authority: Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, M~eting #3 - May l5, 1981
Subject- property #5 I.akehurst Crescent
OWner Gerd Schwarzkopf
Area to be acquired o 087 acres, more or less
Recommended purchase price Nominal consideration of $2 00, plus
vendor's legal costs
"Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being Part of Lot l4, Registered Plan 4048, City of
Scarborough (The Municipality of Metropolitan Toronto), and being a partial
taking from a residential property fronting on the south side of I.akehurst
Crescent, in the Birchmount Road area
"Negotiations have been coducted with the owner and his solicitor, Mr.
Steven F Troster, Suite l800, 700 Bay Street, Toronto, Ontario, M5G lZ6,
and, subject to the approval of your committee, agreement has been reached
with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2 00,
with date of completing the transaction to be as soon as
possible.
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"This property is being acquired in conjunction with certain Shoreline
Management Works to be carried out on this property
"Funds are available for this acquisition - Account 0-04-l3-40l - Waterfront
Hazard."
-9- B-24l
9 QUOTATION #CI.M83-27
-.Albion Hills Conservation Area Septic System
Res #203 Moved by H.C Lawrie
Seconded by Mrs L Hancey
THAT the quotation of J. Gilbert & Sons I.td , for the supply of equipment,
labour, and material for the installation of a septic system at the
Albion Hills Conservation Area, in the sum of $6,l50 00, be accepted, it
being the lowest quotation received.
CARRIED
lO QUOTATION #CI.M83-29
-3/4-ton Truck
Res #204 Moved by H.C. Lawrie
Seconded by Mrs. I. Hancey
THAT the quotation of Highland Chevrolet Olds I.td. for the purchase of one
new 3/4-ton truck, with trade-in, in the sum of $9,394 87 + Licence, be
accepted, it being the lowest quotation received.
CARRIED.
II BRUCE'S MII.I. CONSERVATION AREA
-Grist Mill Restoration Consultant's Services
Res. #205 Moved by J.S. Scott
Seconded by Mrs. N Stoner
THAT the consultant firm of I. J Rak Engineering I.td. be retained, for an
upset fee of $l,050 00, to carry out a detailed soil investigation in the
area of the Grist Mill at the Bruce's Mill Conservation Area
CARRIED.
l2 BLACK CREEK PIONEER VII.I.AGE VISITOR CENTRE
-Building Permit Fee
Res. #C06 Moved by Mrs. N Stoner
Seconded by Mrs. I. Hancey
THAT the City of North York Council be requested to consider waiving the
Building Permit fee for the Black Creek Pioneer Village Visitor Centre
CARRIED
13 KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme Program Well Drilling
Res #207 Moved by M.W H Biggar
Seconded by W G. McI.ean
THAT the contract for the drilling and casing of a well to accommodate the
requirements of the Water Theme and the Renewable Energy Theme Programs at
the Kortright Centre for Conservation, be awarded to the firm of
Constable Drilling Co., in the maximum amount of $3,225 00, plus applicable
taxes
CARRIED.
l4 KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme Program Water Project
Res #208 Moved by M.W.H Biggar
Seconded by W G. McI.ean
THAT the contract for the fabrication and installation of an in-stream,
energy-generating device called "Wing Will", in a weir in the Humber River,
as part of the Renewable Energy Theme Program - Water Project at the
Kortright Centre for Conservation, in the amount of $l,945 00, be awarded to
the University of Toronto, Institute for Aerospace Studies. CARRIED.
o
.
B-242 -10-
l5. KORTRIGHT CENTRE FOR CONSERVATION
-Renewable Energy Theme Program Solar Project
Res. #209 Moved by M W H. Biggar
Seconded by W G. McLean
THAT the contract for the supply of thermal solar panels for the bee space
house, Solar Project, Renewable Energy Theme Program at the Kortright Centre
for Conservation, at the estimated price of $2,825 00, plus applicable taxes,
be awarded to Watershed Energy Systems.
CARRIED.
l6. 1984 AUTHORITY MARKETING PLAN
Res. #2l0 Moved by: W.G. Mcl.ean
Seconded by Mrs. N. Stoner
THAT the proposal of Woods Gordon, dated June lO, 1983, for the preparation
of the 1984 Marketing Plan, be referred to the Marketing Plan Sub-Committee.
CARRIED.
l7 FINANCIAl. REPORT AND ACCOUNTS
-Month Ending June 30, 1983
Res #211 Moved by J.S Scott
Seconded by E. V . Ko1b
THAT the Divisional Expenditure Summary for the period June l-June 30, 1983,
as appended as Schedule '~" of these Minutes, be received,
AND FURTHER THAT paymertt of the Authority accounts, in the amount of
$2,049,871 00, be approved.
CARRIED.
l8 Bl.ACK CREEK PIONEER VILLAGE VISITOR CENTRE
-Ground Breaking Ceremony
Res. #212 Moved by Mrs. L. Hancey
Seconded by M.W.H. Biggar
THAT the Chairman of the Black Creek Pioneer Village Visitor Centre Building
Sub-Committee, and the Chairmen of the Historical Sites, Information and
Education, and Humber Valley Advisory Boards be appointed a committee to
make the necessary arrangements for the official Ground Breaking ceremony for
the Black Creek Pioneer Village Visitor Centre.
CARRIED
19 DECISION OF HEARING
-Mr George Hinder
City of North York
Don River Watershed
Res #213 Moved by Mrs L. Hancey
Seconded by W G. Barber
THAT the application of Mr George Hinder, in accordance with Ontario
Regulation l70, for permission to place fill within the fill regulated area
of the Don River in the City of North York, be refused for the following
reason:
.That the application, as submitted, would affect the conservation
of land
ABSTAINED FROM VOTING MS S NIMMO
CARRIED.
.
,
-11- B-243
20. NEW BUSINESS
Res. #214 Moved by W.G. McLean
Seconded by Mrs. L Hancey
THAT Authority staff be instructed to meet with staff of The Municipality of
Metropolitan Toronto to discuss
(a) the acquisition of the Hinder property, as referred to in the
letter dated August 9, 1983, from the Metropolitan Solicitor,
(bl the status of land use and zoning designations and their
significance to appraisal value,
(cl request of the owners for a meeting,
(dl appropriate timing for discussions with the Ministry of
Natural Resources
ABSTAINED FROM VOTING MS. S. NIMMO
CARRIED.
2l TERMINATION
On motion, the meeting terminated at II 45 am., August lO.
Florence Gell W.E Jones
Chairman Secretary-Treasurer
KC
B-244
SCHEDULE "A"
REPORT #2/83
OF THE
TENDER OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office, 5
Shoreham.Drive, Downsview, on Thursday, July 28, 1983 commencing at
ll:05 a.m. to consider the following tender:
REHABILITATION OF THE PALGRAVE DAM - TOWN OF CALEDON
Present:
Mr. J.S. Scott Chairman, Flood Control &
Water Conservation Advisory Board
Mr. W.E. Jones Secretary-Treasurer
Mr. J .C. Mather Staff
Mr. R.W. Dewell Staff
Mr John Jaffs Consulting Engineer
The Committee was advised that nine tenders for the project were received
as follows:
Contractor Tender
Amount
Massi Construction Co. Ltd. $38,451.00
Greco Construction $42,726.00
Jim Daly Contracting $47,592.00
M. & A. Building Restoration $50,343.90
Andrew Paving & Engineering Ltd. $52,142.10
Maple Engineering & Construction Co. $52,lS43.00
Lancione Contracting Company Ltd. $54,036.00
Benfil Engineering & Construction $68,251.00
Intrusion-Prepalet Limited $85,467.80
Mr. S. Scott, Chairman of the Flood Control and Water Conservation Advisory
Board referred the tender documents to the consultants, Cumming-Cockburn
Ltd. , for their review and recommendation.
IT WAS AGREED AND THE COMMITTEE RECOMMENDS THAT:
All tenders received for the Rehabilitation of the Palgrave Dam, Town of
Caledon, be submitted to cne Engineering Consultants for their review and
report with recommendations to be supplied to the Executive Committee at
their meeting on Wednesday, August lO, 1983.
J. S. Scott W. E. Jones
Chairman Secretary-Treasurer
August 3, 1983
RWO L
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
DIVISIONAL EXPENDITURE SUMMARY
FOR THE PERIOD JUNE 1, 1983 to JUNE 30, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $ $
Finance & Admin (incl. Land Acq.) 3,186,465 26l,172 1,318,957 1,867,508 41.4
Water Resource - Flood Control 2,911,389 l67,5l8 987,316 1,924,073 33.9
Water Resource - Waterfront 2,325,000 266,l70 580,686 1,744,314 25.0
Conservation Land Management 3,548,345 462,027 l,693,606 1,854,739 47.7
Information & Education 2,426,623 182,261 982,436 1,444,187 40.5
Historical Sites 3,912,822 233,214 949,298 2,963,524 24.3
Vehicle & Equipment - Capital Acq 280,730 45,132 118,826 161,904 42.3
\
SUB-TOTAL 18,591,374 1,6l7,494 6,631,l25 11,960,249 35.7
Vehicle & Equipment - Operations -- 19,686 115,532 -- --
Special Projects -- 100,905 335,529 -- --
C.O.E.D 1983/84 2,123,80B 188,614 322,489 1,801,3l9 15.2
Food Services 833,317 123,172 339,582 493,735 40.8
(/l
()
2l,548,499 2,049,871 7,744,257 :I:
TOTAL -- -- t'l
0
C
~=======~=======~===========g====~=========a==========Cg============= L'
t'l lJl
I
N
lJl ~
: U1
~ B-246
,
the metropolitan toronto and region conservation authority
minutes REPORT #14/83
EXECUTIVE COMMITTEE 31-AUGUST-l983 #l4/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 31 August, 1983.
PRESENT
Chairman Mrs. F.E. Gell
Vice-Chairman E V. Kolb
Members W.G. Barber
M.W.H Biggar
E. Fulton
Mrs L. Hancey
H.C. Lawrie
S.A. Macpherson
Ms. S. Nimmo
J S. Scott
. ABSENT
Member Mrs. N Stoner
MINUTES.
Res #215 Moved by: W G. Barber
Seconded by M.W.H Biggar
THAT the Minutes of Meeting #l3/~3 be approved.
CARRIED
SECTION I
NO ITEMS
SECTION II
FOR CONSIDERATION
CORRESPONDENCE
Mr W.A. Mcl.ean, Acting General Manager, reported receipt of the following
correspondence
Letter dated 1983.08 11 addressed to the Chairmen, Conservation
Authorities of Ontario from the Deputy Minister of Natural
Resources, enclosing a copy of "Preliminary Provincial Policies
for Conservation Authorities". Review and comments by Authorities
is required by October l4, 1983
Res #2l6 Moved by J.S. Scott
Seconded by M.W.H. Biggar
THAT the staff be directed to prepare a report and recommendations on "Preliminary
Provincial Policies for Conservation Authorities" for consideration by the
Executive Committee prior to October l4, 1983
CARRIED.
B-247 -2-
Mr McLean also stated that in response to requests by the Authority for a meeting
with the Minister of Natural Resources concerning such matters as the Waterfront
Programme, erosion along the Bellamy Ravine, and the Official Opening of the Bolton
channel improvements, advice has now been received that Mr Pope will be available
to meet with the Authority from 10 00 a.m to 3 00 p m on Friday, October 14
Since this is the date scheduled for the Preliminary Budget meeting of the full
Authority, this meeting will be held at the Bolton Community Centre, commencing at
lO 00 a m., and arrangements will be made for Messrs E Fulton and C Mather to
tour the Minister by helicopter from his office via appropriate points of interest
to Bolton, where he will join the members for luncheon, and officiate at the
Official Opening ceremonies.
.
THE ORDER OF THE AGENDA WAS VARIED AT THIS TIME FOR CONSIDERATION OF THE FOl.l.OWING
ITEM
1 BLACK CREEK PIONEER VIl.l.AGE VISITOR CENTRE
-Tender Opening
A staff report was presented advising that the lowest price received for the
Black Creek Pioneer Village Visitor Centre at the tender opening of
August l7, 1983, was considerably higher than the funds available A post-
contract addendum was distributed to the three lowest tenderers, and the
following bids were opened on August 29, 1983
Mitchell Construction l.td. $3,242,339 00
Fairwin Construction $3,318,400 00
Bradsil Limited $3,436,000 00
Res #217 Moved by: E. V Ko1b
Seconded by M W H. Biggar
THAT the Authority enter into a contract with Mitchell Construction l.imited
for the construction of the Black Creek Pioneer Village Visitor Centre at a
. cost not to exceed $3,239,839 00,
AND FURTHER THAT the architect, Mr Gordon Cheney, be authorized and directed
to negotiate with Mitchell Construction l.td to achieve the revised contract
price in accordance with the report dated 1983 08 31, adopted by the Black
Creek Pioneer Village Visitor Centre Building Sub-Committee, and appended as
Schedule "A" of these Minutes
CARRrED.
2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION l70
Res 218 Moved by Mrs l. Hancey
Seconded by S A Macpherson
THAT the applications listed herein as A(l) to A(20) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED.
A(l) City of Brampton
To construct asphalt walkway under Elgin Drive bridge crossing
the Etobicoke Creek
In accordance with the following documents and plans, which shall form
part of the permit
Sheet #3, Drawing #83-53, prepared by F.J. Reinders & Associates
and dated July 1983
A(2) City of Brampton
To alter watercourse north of Steeles Avenue, west of Dixie Road
(Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) Drawings #8250-A-4, 6, 7, 8, and ll, Contract #83-l33, as prepared
by Paul Theil Associates Ltd and dated June 1983,
(b) Drawing #79l7-B-5, prepared by Paul Theil Associates Ltd
-3- B-248
A(3) Ambrosia Restaurant
To construct addition to restaurant, south of Dundas Street, east
of Southcreek Road, City of Mississauga (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #l, Project #7571, prepared by R.E. Winter & Associates l.td.,
and dated 1983-07.
A(4) Whitehorn Investments l.imited
To construct storm sewer outfall to tributary of the Don River,
south of Birch Avenue, east of Bathurst Street, Town of
Richmond Hill
In accordance with the following documents and plans, which shall form
part of the permit
.Drawing #2, Project #lO-8l005, prepared by Marshall Macklin Monaghan
l.td and dated April 1983.
A(5) Mr. Barry Cooper
To. construct single-fami.ly dwelling at #8 Plymbridge Road, City
of North York (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #A-l, A-2, and A-4, as prepared by Keith H. Wagland,
Architect. -
A (6) Mr Robert M Ogilvie
To construct single-family dwelling at #10 Plymbridge Road, City
'Of North York (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #A l, A.2, A 3, and A 5, as prepared by Keith H. Wagland,
Architect
- ---- - _._-
A(7) Town of Vaughan
To construct Clark Avenue storm sewer outfall to the Don River,
west of Dufferin Street, south of Highway #7
In accordance with the following documents and plans, which shall form
part of the permit
.Drawing #2 and 12, Project #79~ES-478, prepared by Fred Schaeffer
& Associates l.td.
A(8) Mr William Tkachuk
Too construct gabion basket wall at rear of #l56 Humbervale Blvd.,
City of Etobicoke (Mimico Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.The report, and its recommendations, dated April 1983, as prepared
by Golder Associates, entitled "Proposed Remedial Works for a
Gabion Wall, 156 Humbervale Blvd., Etobicoke, Ontario" .
B-249 -4-
A(9) City of "Brampton
To deepen and widen concrete-lined channel, west of Heart Lake Road,
north of Queen Street (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.Sheets #25, 26, 32, 3, 4, 5, 6, 7, and 8, prepared by the City
of Brampton Engineering Department and dated July 1983
A(lO) Fogliato Investments l.td
To alter tributary of the Etobicoke Creek, north of Sismet Road,
east of Dixie Road, City of Mississauga
In accordance with the following documents and plans, which shall form
part of the permit
.Sheets land 2, as prepared by Tom Drzic Ltd. and dated July 1983
A(ll) The Municipality of Metropolitan Toronto
To construct two pedestrian bridges crossing the Black Creek,
south of Shoreham Drive, east of Jane Street, City of North York
(Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
.Drawing Nos. 1 to. 4 inclusive, Project #83-17, prepared by
Johnson, Sustronk, Weinstein & Associates
A(l2) Mr. Robert W. l.ucas
To build timber retaining wall, with related filling, rear of
#69 Satok Terrace, City of Scarborough (Highland. Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.Project #l83, dated June 1983, Drawing #1, prepared by
D S. l.andscape Designs
A(l3) Mr Luca Tesa
To construct temporary stand for fruit and vegetables on flood
plain of the Humber River, l.ots 3 & 4, Concession VII, Town of
Vaughan
In accordance with the following documents and plans, which shall form
part of the permit
.The plan as prepared by Ron Mauti, Architect.
A(14) Revenue Properties Central Developments l.td.
To construct outfall into the Miller's Creek channel, Rotherglen
Road, south of Highway #2, Town of Ajax (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawings #Al-83707-Pl, P3, and G-l, dated February 1983,
by Proctor & Redfern Ltd
-5- B-250
A(15 ) City of Scarborough
To construct diversion of the Morningside Tributary of the
Rouge River, Staines Road/Ontario Hydro Corridor
In accordance with the following documents and plans, which shall form
part of the permit
.Borough of Scarborough Contract 514, Drawings 4408-Cl to
Cll, 4408-S1 to S9, and 440B-Ll to L4, prepared by
Andrew Brodie Associates Inc. , Cole Sherman & Associates l.td.,
and Paul D. Ferris Associates
A(l6 ) Mr. Vince Verducci
To alter watercourse, north of Birch Avenue, east of Bathurst
Street, Town of Richmond Hill (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.The cross section and site plan prepared by Mr. Vince Verducci.
A(171 Mr. Joe Pulla
To place within regulated area, north of Oxford Street, east of
Bathurst Street, Town of Richmond Hill (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.Drawing #l prepared by S. Mahut.
A(l81 Venturin Development Corporation l.td.
To carry out temporary diversion of New Westminster Creek, south
of Highway #7, east of Dufferin Street (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Dr awing Nos Pl, P4, P6, P15, and P20, Project #lO-B2097,
prepared by Marshall Macklin Monaghan l.td
A(l91 Town of Vaughan
To alter channel of New Westminster Creek, east of Dufferin
Street, south of Highway #7 (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
.Drawing Nos P2 to P6 inclusive, Project #10-83025, prepared
by Marshall Macklin Monaghan l.imited.
A(20) Town of Vaughan
To construct pedestrian and vehicular access road, south of Glen
Shields Road, west of Dufferin Street (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Drawing No BOl8-A-l3, as prQpared by Paul Theil Associates.
I
I
B-25l -6-
3 Bl.ACK CREEK PIONEER Vll.l.AGE
-Proposed pond vicinity of the Nesbitt Sawmill
Res. #2l9 Moved by M W H Biggar
Seconded by S A. Macpherson
THAT the construction of a detention pond, which will serve the Nesbitt
Sawmill at the Black Creek Pioneer Village, be approved,
AND FURTHER THAT the necessary and appropriate storm sewer easements be
conveyed to the Town of Vaughan for a nominal fee.
CARRIED.
4 HUMBER RIVER CHANNEl. IMPROVEMENTS - FORMER VILl.AGE OF BOl.TON, PHASE II
-Extra Work Order #1
Res. #220 Moved by M.W.H. Biggar
Seconded by S.A. Macpherson
THAT Extra Work Order #l to the contract for Humber River Channel
Improvements - forme~ Village of Bolton, Phase II, be approved,
AND FURTHER THAT approval of the Ministry of Natural Resources be requested
CARRIED.
5 HUMBER RIVER CHANNEl. IMPROVEMENTS CONTRACT - PHASE II
-Extra Work Orders #8 & #9, and
Revised Extra Work Orders #2 & #5
Res #22l Moved by M.W.H Biggar
Seconded by S.A. Macpherson
THAT revised Extra Work Order Nos. 2 and 5, and additional Extra Work Orders
Nos. 8 and 9, in the amounts of $3,493 89, $l,lOO.OO, $2,500 00, and $2,202.10
respectively, be approved,
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested.
CARRIED.
6. l.AND ACQOIS.ITI0N PROJECT 1982-l984 HUMBER RIVER WATERSHED
-Property: The Corporation of the Town of Caledon
Between Humber Lea Road and Queen Street, Bolton
Res. #222 Moved by M.W.H. Biggar
Seconded by: S.A. Macpherson
THAT the report (August 12, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase
CARRIED.
Re Project Land Acquisition Project 1982-l984 - Fl"ood
Plain & Conservation l.and Component: Humber
River Watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May l5, 1981
Subject property West side Humber l.ea Road
Owner The Corporation of the Town of Caledon
-7- B-252
Area to be acquired 4.l53 acres, more or less
Recommended purchase price Nominal consideration of $2 00, plus costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of l.ots l6l, l8l, Block 1, Part of l.ot 24,
Block 5, Plan BOl.-7, and Part of Lots Ie' , 30, 37, and 39, Plan BOl.-9, Town
of Caledon (The ReC)tiona1 Municipality of Peel), located between Humber Lea
Road and Queen Street, in the Bolton area.
"Negotiations have been conducted with The Corporation of the Town of Ca1edon,
and, subject to the approval of your Committee, agreement has .been reached
with respect to a purchase price, as follows
The purchase price is to be the nominal sum of $2.00, plus costs,
with date of completing the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements, are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance, with the exception of
existing service easement
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-ll-40l - Flood Plain
l.and Acquisition."
.
7 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property The Regional Municipality of Peel
East side Highway #50, Town of Caledon
Res. #223 Moved by: M.W H. Biggar
Seconded by S.A. Macpherson
THAT the report (August 23, 1983l set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase of the
Permarient Easement
CARRIED.
"Re Project Land Acqwisition Project 1982-l984 - Flood
Plain & Conservation Land Component Humber
River watershed
Auth9rity Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property East side Highway #50
OWner The Regional Municipality of Peel
Area over which a permanent
easement is to be acquired o 02 acres, more or less
Recommended purchase price: Nominal consideration of $2.00, plus
legal and survey costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lot 'e' , Plan BOl.-9, Town of Caledon
(The Regional Municipality of Peel), located east side of Highway #50
"Negotiations have been conducted with officials of The Regional Municipality
of Peel, and, subject to the approval of your Committee, agreement has been
reached with respect to a purchase price, as follows
I
B-253 -8-
The purchase price is to be the nominal sum of $2 00, plus legal
and survey costs, with date of completing the transaction to be
as soon as possible.
"I recommend approval of this purchase of a permanent easement, and that the
legal firm of Gardiner, Roberts be instructed to complete the purchase All
reasonable expenses incurred incidental to the closing, for legal costs and
disbursements, are to be paid.
"The acquisition of this easement is required to facilitate construction of
the Bolton Flood Control works.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-ll-401 - Flood Plain
Land Acquisition."
8. l.AND ACQUISITION PROJECT 1982-1984: HIGHl.AND CREEK WATERSHED
-Property The Municipality of Metropolitan Toronto
West side Morningside Avenue, north of l.awrence
Avenue, City of Scarborough
Res. #224 Moved by M.W.H. Biggar
Seconded by S.A. Macpherson
THAT the report (August 15, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED
"Re Project l.and Acquisition Project 1982-1984 - Flood
Plain & Conservation l.and Component
Highland Creek watershed
Authority Executive Resolution #88, Meeting #~ -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property West side Morningside Avenue, north of
Lawrence Avenue
Owner The Municipality of Metropolitan Toronto
Area to be acquired 1 9Z8 acres, more or less
Recommended purchase price: Nominal consideration of $2 00, plus costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of l.ot ll, Concession I, and Part of
Parcel IAI _ Registered Plan 441, City of Scarborough (The Municipality of
Metropolitan Toronto), located on the west side of Morningside Avenue, north
of Lawrence Avenue.
"Negotiations have been conducted with officials of The Municipality of
Metropolitan Toronto, and, subject to the approval of your Committee,
agreement has been reached with respect to a purchase price, as follows:
The purchase price is to be the nominal sum of $2.00, with
date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs, and disbursements, are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-l1-401 - Flood Plain
l.and Acquisition."
-9- B-254
9 l.AND ACQUISITION PROJECT 1982-l984 HIGHLAND CREEK WATERSHED
-Property City of Scarborough
South of Sheppard Avenue East, west of l.apsley Road
Res #225 Moved by M.W H Biggar
Seconded by: S.A Macpherson
THAT the report (August 11, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase
CARRIED.
"Re Project Land Acquisition Project 1982-l984 - Flood
Plain & Conservation Land Component
Highland Creek watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May 15, 1981
Subject property South of Sheppard Avenue East, west of
Lapsley Road
OWner City of Scarborough
Area to be acq~ired 0 34l acres, more or less
Recommended purchase price Nominal consideration of #2.00
"Included in the requirements for the above-noted project are two irregularly-
shaped parcels of land,being All of Blocks 'F' and 'H I, Plan M-l5l7, City
of Scarborough (The Municipality of Metropolitan Toronto), south of Sheppard
Avenue East, west of l.apsley Road
"Negotiations have been conducted with the City of Scarborough, and, subject
to the approval of your Committee, agreement has been reached with respect to
a purchase price, as follows
The purchase price is to be the nominal sum of $2 00, with date
of completing the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs, and disbursements, are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-l1-40l - Flood Plain
l.and Acquisition "
I
B-255 -10-
lO. l.AND ACQUISITION PROJECT 1982-l984 HIGHl.AND CREEK WATERSHED
-Property William G. Tredway & Mary F.S. Miller
South side l.awrence Avenue, west of Centennial
Road, City of Scarborough
Res. #226 Moved by M.W.H. Biggar
Seconded by: S.A. Macpherson
THAT the report (August 24, 1983) set forth herein, received from the Manager,
Property & Administrative Services, be adopted, and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED.
"Re Project: l.and Acquisition Project 1982-l984 - Flood
Plain & Conservation l.and Component:
Highland Creek Watershed
Authority: Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution
#38, Meeting #3 - May l5, 1981
Subject property South side l.awrence Avenue
OWners William G. Tredway & Mary F.S. Miller
Area to be acquired 2.926 acres, more or less
Recommended purchase price $12,000.00, plus vendors' legal costs
"Include in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being All of Block tAl, Plan M-l980, City of
Scarborough (The Municipality of Metropolitan Toronto), located on the south
side of l.awrence Avenue, west of Centennial Road,.being a partial taking from
the original Tredway homestead
"Negotiations have been conducted with the owners and their solicitor,
Mr. Tom A. Newman, Q.C. , 27 Queen Street East, Toronto, Ontario, MSC 2M6, and,
subject to the approval of your Committee, agreement has been reached with
respect to a purchase price, as follows
The purchase price is to be $l2,000.00, plus vendors' legal costs,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs, and disbursements, are to be paid. The Authority is to receive con-
veyance of the land required free from encumbrance
"This property is being purchased on a basis that will allow for a 1984
closing date, if required
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
"Funds are available for this acquisition - Account 0-04-11-401 - Flood Plain
l.and Acquisition "
11 QUOTATION #Cl.M83-33
-Cross-Country Ski Equipment
The following quotations were received for the supply of cross-country ski
equipment for the rental operations at the Albion Hills and Bruce's Mill
Conservation Areas
_11- B-256
Skis Boots Poles Bindings
Karhu-Titan l.td 59 pro @ - - 75 pr @
$44 BO $5 00
3 pr @
$26 40
Vikski Canada l.td 59 pro @ 75 pro @ 46 pro @ 75 pr @
$41 00 $19.95 $5.95 $5 lO
3 pr @ 7 pr @ 5 pr @
$30.00 $1B 95 $5.60
Ruko of Canada - - 51 pro @ -
$5.50
Nishizawa Sports 59 pr @ 3l pro @ 46 pr @ 75 pr @
$42 00 $27.50 $7.00 $5.65
3 pr @ 51 pro @ 5 pr @
$34 20 $25 00 $3 BO
Res. #227 Moved by: H C. l.awrie
Seconded by W G Barber
THAT the following quotations for the supply of cross-country ski equipment,
in replacement of damaged or worn-out equipment, be accepted
Vikski Canada Ltd for 59 pairs of X-C skis at $4l.00 a pair, and 3 pairs of
X-C skis at $30 00 a pair,
Vikski Canada Ltd for 75 pairs of X-C boots at $l9 95 a pair, and 7 pairs of
X-C boots at $18 95 a pair,
Ruko of Canada for 5l pairs of X-C poles at $5 50 a pair,
Karhu-Titan Ltd for 75 pairs of bindings at $5 00 a pair
Total acquisition, including Federal Sales Tax = $4,793 40
CARRIED.
l2 QUOTATION #CLMB3-30
Albion Hills Conservation Area Washroom - Hydro Service
The following quotations were received for the supply of equipment, labour,
and materials for the above-noted installation.
Jack Langen Electric l.imited $3,125.00
Sturdy Power l.ines $3,634.00
(excluding ProvinciaL Sales Tax)
Res. #22B Moved by H.C. l.awrie
Seconded by W G. Barber
THAT the quotation of Jack l.angen Electric l.imited, for the supply of
equipment, labour, and materials for the installation of a 200 amp service
for the Albion Hills Conservation Area washroom, in the sum of $3,l25 00,
plus Provincial Sales Tax, be accepted, it being the lowest quotation
received
CARRIED.
B-257 -12-
13 QUOTATION #CLM83-32
Indian Line Campground Superintendent's Residence - Trusses
The following quotations were received for the supply of pre-fabricated
trusses for the above:
Cadillac Building Products $l,4l6 00
Arnold Lumber $l,500.00
Woodbridge l.umber $l,600 00 )
(excluding Provincial Sales Tax)
Res. #229 Moved by: H.C. l.awrie
Seconded by W.G. Barber
THAT the quotation of Cadillac Building Products, for the supply of pre-
fabricated trusses for the Superintendent's residence - Indian l.ine
Campground, in the sum of $1,4l6 00, plus Provincial Sales Tax, be accepted,
it being the lowest quotation received.
CARRIED
l4 Al.BION HILLS CONSERVATION FIEl.D CENTRE
-Ontario Building Code Update & Dormitory Re-design
Proposal - Plumbing and Bathroom Fixtures
The following quotations have been received for the above
Solar Plumbin~ Limited $11,078 00
Maurice Breen l.td. $l2,223 69
Walter l.ong Plumbing l.td. $12,500.00
Res #230 Moved by Mrs. l.. Hancey
Seconded by H.C. l.awrie
THAT the proposal of Solar Plumbing l.imited, to modernize the plumbing and
bathroom fixtures at the Albion Hills Conservation Field Centre, in the
amount of $ll,078.00, be accepted, it being the lowest quotation received
CARRIED
l5. KORTRIGHT CENTRE FOR CONSERVATION
-Land Theme Demonstration Building Flooring
The following quotations were received for concrete flooring (labour and
materials) :
Franore Drain & Concrete Ltd $6,025 00
Plastina $6,500.00
Belvedere Drain & Concrete l.td. $6,850.00
Res. #23l Moved by Mrs L Hancey
Seconded by: H C. Lawrie
THAT the quotation of Franore Drain & Concrete Ltd. for the supply and
installation of concrete flooring at the Land Theme Demonstration Building,
Kortright Centre for Conservation, in the amount of $6,025 00, be accepted,
it being the lowest quotation received
CARRIED
-13- B-258
l6 REPORT #3/83 - TENDER OPENING SUB-COMMITTEE
-Black Creek Pioneer Village Visitor Centre
The following tenders were received on August 17, 1983, for the construction
of the Creek Pioneer Village Visitor Centre
Contractor Tender Amount
Fairwin Construction $3.856,000 00
Mitchell Construction l.td 3.889,356 00
Bradsil l.imited 4,057,000 00
Buttcon Construction Ltd. 4,085,000 00
Q-Sons Construction Co l.td. 4,l23,000 00
Manville Development Corp 4,278,000.00
Big H. Construction 4,300,000 00
Harbridge & Cross Ltd. 4,318,000 00
Perwin Construction Co Ltd. 4,470,000 00
Skycon Construction 4,661,000 00
Res #232 Moved by Mrs L. Hancey
Seconded by J S Scott
THAT Report #3/83 of the Tender Opening Sub-Committee be received.
CARRIED
l7 REPORT #4/83 - TENDER OPENING SUB-COMMITTEE
-Bluffers Waterfront Park: Phase II
Road and Parking Lot Paving
The following tenders were received for the asphalt paving of the roadway
and parking lot to the easterly end of Bluffers Waterfront Park - Phase II
development
Contractor Tender Amount
Empire Paving l.td. $46,420 00
D Crupi & Sons Ltd $47,500 00
Andrew Paving & Engineering l.td $48,800 00
Associated Paving Co l.td 549,414 00
Ferpac Paving Inc $50,920 00
Miller Paving l.td. $51,l04 30
Fermar Paving l.td. $53,213 20
Newport Paving & Construction $55,999 00
Warren Bitulithic l.imited $56,158 00
Aurostar Inc $73,800 00
Res #233 Moved by Mrs l. Hancey
Seconded by S.A Macpherson
THAT Report #4/83 of the Tender Opening Sub-Committee, as appended as
as Schedule "B" of these Minutes, be received,
THAT the tender of Empire Paving l.imited, in the amount of $46,420 00, for
Contract 83-01, Site Paving at Bluffers Waterfront Park - Phase II, be
accepted, it being the lowest tender,
AND FURTHER THAT approval of the Province of Ontario be requested
CARRIED
B-259 -14-
l8 REPORT #2/83 - MARKETING Pl.AN SUB-COMMITTEE
Res. #234 Moved by M W H. Biggar
Seconded by Ms S Nimmo
THAT Report #2/83 of the Marketing Plan Sub-Committee, together with the
proposal of Woods Gordon, Management Consultants, dated August l7, 1983, for
the preparation of the 1984 Marketing Plan, as appended as Schedule "C" of
these Minutes, be received,
THAT the proposal of Woods Gordon. dated August 17, 1983, for the preparation
of the 1984 Marketing Plan, in the amount of $9,000 00, be accepted,
AND FURTHER THAT an additional maximum amount of $2,500 00 be provided for a
one-day workshop
CARRIED
19 STAFF FINA~CIAl. PROGRESS REPORT
-April l/June 30, 1983
Res #235 Moved by Mrs l. Hancey
Seconded by J.S Scott
THAT the Staff Financial Progress Report for the period April l-June 30, 1983,
as appended as Schedule "0" of these Minutes, be received
CARRIED
20 AMO REPORT 83-5
-Reform and Revision of Conservation Authorities in Ontario
Res #236 Moved by M.W H Biggar
#I Seconded by Mrs l.. Hancey
THAT AMO Report 83-5 - Reform and Revision of Conservation Authorities in
Ontario, together with correspondence received from the Executive Director,
The Association of Conservation Authorities of Ontario, under date of
August 8, 1983, be received,
AND FURTHER THAT staff be directed to prepare a report in this connection
for consideration of the Executive Committee
CARRIED
21 TERMINATION
On motion, the meeting terminated at II 35 am., August 3l
Florence E Gell W.E Jones'
Chairman Secretary-Treasurer
KC
B-260
SCHEDUl.E "A"
To The Black Creek Pioneer Village Visitors Centre Committee
From Mr Emil Kolb, Chairman
Re Tender
The lowest price received for the Black Creek Pioneer Village Visitors
Centre received on the tender call of August 17, 1983, was $3,856,000
from Fairwin Construction Company Since this was considerably higher
than the funds available, the architect, Mr Gordon Cheney, was asked to
distribute a post-contract addendum to the three lowest tenderers which
changed or removed the following items from the tender price
1 Change the roof from a sloping surface to a flat surface.
2 Have the Authority staff cut down the trees on the site
3 Change the window sills from precast concrete to aluminum
4 Remove the dumb waiter
5 Have the Authority carry the fire insurance.
6 Reduce the quality of the panic door hardware
7. Reduce the hardware allowance by $10,000.
8 Remove the labour and material bond (since replaced)
9. Allow the contractor to use a portable classroom as an office.
10 Change the ceiling boards from maple to pine.
11 Reduce the costs of certain electrical fixtures
l2 Reduce the costs of certain mechanical equipment (since replaced)
13 Remove the kitchen equipment from the contract and pay for it through
a lease-purchase agreement at a cost of approximately $350,000 over 5 years.
14 Remove the pond and artificial ice rink and equipment.
The post-contract aJdendum was received on Mon.,August 29th, and the low price
was from Mitchell Construction Limited at $3,242,339 Fairwin's price was
$3,318,400 and Bradsil's was $3,436,000
The architect is of the opinion that the $20,000 allowed by the mechanical
contractor in the post~contract addendum is very low and should be put back
into the contract
There is a further savings of $24,000 that can be made by changing the roof
structure from a membrane to a built-up tar and gravel surface
Other minor changes can be made to reduce the price by $5,000
It is felt that the labour and material payment bond should be kept in the
contract at a cost of $6,500
It is proposed that $37,000 be taken from the contingency fund and used as
revenue Total interest from revenue funds is estimated at approximately
$60,000 and will form the contingency fund.
Statement of Revenues & Expenditures
Revenues
Member Municipalities $ 600,000
Wintario 530,000.
r.ottario 1,250,000.
McNair Estate (as ~er solicitor's letter) 450,000
Other estate funds and donations already
received by the M.T R C F 100,000
Funds pledged by the M T R.C F 633,000.
Funds from the contingency (interest) 37,000.
$3,600,000
B-26l
.. 2 -
Expenditures
Mitchell quote $3,242,339
Replace deleted mechanical items 20,000
Savings on roof structure (24,000 )
Savings on other minor changes (5,000 )
Increase for labour & material payment
bond 6,500.
Mitchell Contract Price $3,239,839
Allowance for landscaping 10,000.
Architect's fees 250,000.
Allowance for furnishings 100,000.
$3,599,839.
Recommendation
IT IS RECOMMENDED THAT the Authority enter into a contract with Mitchell
Construction Limited for the construction of a Visitors Centre at Black
Creek Pioneer Village at a price not to exceed $3,239,839
.
1983.08 31
B-262
SCHEDULE "B"
REPORT H/83
OF THE
TENDER OPENING Sua-COMMITTEE
The Tender Opening Sub-Committee met at the A.uthority- Office, 5 Shoreham
Drive, Downsview on Monday, A.ugust 29, 1983 commencing at 2 00 pm, to
consider the following tender:
CONTRA.CT 83-01 SITE PAVING A.T BLUFFERS
P1\RK - PHA.SE II-, SCARBOROUGH
PRESENT WERE:
Staff W. E. Jones
J. C. Mather
B. E. Denney
N. B. Cowey
The Committee was advised that ten tenders for the project were received,
as follows
Contractor Tende'r '.Al1lount
Empire Paving Ltd $46,420 00
D Crupi & Sons. Ltd $47,500 00
Andrew Paving & Engineering Ltd $48,800.00
Associated Paving Co Ltd. $49,414.00
Ferpac Paving Inc. $50,920.00
Miller Paving Ltd $51,104.30
Fermar Paving Ltd. $53,213 20
Newport Paving & Construction $55,999.00
Warren Bitu1ithic Limited $56,158 00
A.urostar Inc $73,800.00
Mr W. E. Jones referred the tender documents to the staff for their review
and recommendation.
IT WAS A.GREED AND THE COMMITTEE RECOMMENDS THA.T
All tenders received for Contract 83-01 Site Paving at Bluffers Park Phase II
be submitted to the staff for their review and report, with recommendations
to be supplied to the Executive Committee at their meeting to be held on
Wednesday, August 31, 1983
W. E Jones J. C. Mather, Administrator
Secretary-Treasurer Water Resource Division
1983 08 30
NC/rnd
.
,B-263
SCHEDULE lie"
.& A MEMBER OF ARTHUR YOUNG INTERNATIONAl.
Woods Gordon Management Consultants
PO, Box 251
Royal Trust Tower
T orontc-DormnlOn Centre
Toronto. Canada MSK lJ7
Telephone: (416) 864.1212
Telex' 06-23191
August 17, 1983
Mr Peter Head
Acting Administrator
Information and Education Division
Metropolitan Toronto and Region
Conservation Authority
5 Shoreham Drive
Downsview, Ontario
M3N IS4
Dear Peter
Your recent discussions with us have indicated the desirability
of presenting the Marketing Sub-Committee with a fuller elaboration of our
proposed approach to the development of the 1984 marketing plan We appreciate
the need to have the Sub-Committee understand explicitly what the process and
outputs are intended to be Since our original letter of July 10, new ideas
have come to light which we are anxious to incorporate into the study process
In this revised proposal letter, we include these suggestions as well as
elaborating upon our suggested methodology
Our approach is predicated upon two positions ~, we feel
that there will be an urgent need to move directly from the current survey work
and analysis into the development of the marketing plan As the Sub-Committee
knows, we have been closely involved with the survey work thus far, and will be
directing the analysis of same The survey was specifically designed to address
some key areas that will be critical to the 1984 marketing plan; our intimate
B-264
&. - 2 -
Woods Gordon
knowledge of the data will be essential to its proper development
~, we believe strongly that the marketing plan should be
developed by the Authority rather than by outside consultants Accordingly, our
approach builds to a large degree upon the wisdom and experience of the members
of the Marketing Sub-Committee (As we 11, Ms Nemo's ideas of obtaining the
input and advice of outside individuals who might have especially useful
insights is an excellent one We wi 11 incorporate this into our approach as
well ) Under our guidance, Authority staff will actually prepare the plan
This approach will ensure that the marketing plan is sensitive to the
organizational/political structure of the Authority, as well as responsive to
the real needs of ~ the Authority and its user base
We have reviewed the 1983 marketing plan in detail We are
pleased to see the Authority adopting the basic philosophy and approach that we
outlined in our Marketing Plan report of 1982 The 1984 marketing plan should
continue the basic thrust and orientation of this marketing effort
The 1984 plan should consist of actions that the Authority will
undertake in five criticai areas
1) product
2) price
3) promotion
4) delivery
5) research, monitoring and control
Further, the marketing plan must be specific to each of the Authority's
faci 1 i ties
There will be a number of key tasks involved in our efforts to
assist you prepare this marketing plan The sequence of these tasks, as well as
their interrelationship with the summer survey work now in progress, is shown on
B-265
- 3 -
~
Woods Gordon
the attached flow chart diagram Also on this diagram we show the expected
division of work between Woods Gordon and Authority staff.
Appended to this flow chart diagram is a detailed description of
each task including the rationale for the task, a description of the task, the
responsibility of the consultants, and the specific outputs resulting from the
task
The budget required for this marketing plan work will remain at $9,000 for
both fees and expenses This assumes that any costs associated with the hiring
of outside individuals fOt: the proposal workshop/"brainstorming" session will be
paid directly by the Authority This budget allows for two meetings, namely a
one-day meeting session with Authority Personnel at our offices and the workshop
day outlined in the attached pages
The individuals participating in the developing of the marketing
plan will be Messrs McClew, Reece and Linton, who were all involved in the
developing of the 1982-1983 marketing plan Resumes for these individuals were
appended to our July 10 letter
We appreciate the need to begin this work as soon as possible I
look forward to discussing this plan with the members of the Marketing
Sub-Committee on the morning of August 19th
With best regards,
~.
M.J McClew
Partner
cc J D Linton
S E Reece
J D R Watson
M.T.R.C.A. 1984 MARKETING PLAN
PROPOSED DEVELOPMENT PROCESS
/".--...,
I G~~N \
I ADVICE AND I
\ LIAISON I
\ /
...... - ".
~~:\
~<r' /",0
'o~__ ~\..
AS ,,~
\
o "ODDS GORDON TASK'
o AUTHORITY TAlKS
o TASKS THAT ARE 'ART OF
IlUMMER SURVEY WORK
Ol
I
N
en
en
8-267
I INITIAL DISCUSSIONS WITH AUTHORITY PERSONNEL
Rationale In order to ensure that the 1984 Marketing Plan is practical
and possible, it will be necessary to determine important constraints
governing the activities of the Authority over the coming years as
well as to firmly establish the expectations of the Marketing
sub-committee concerning the critical areas to be addressed These
will include
- capital budget available to make facility improvements
- expected increase (if any) in Authority's operating budget
- reaction to 1983 marketing plan
- any anticipated organizational changes in the Authority and
their implications
- any areas or facilities thought to be especially in need of
improvement
To obtain this information, we propose to hold discussions with various
Authority personnel These will include all members of the Marketing
Sub-Committee, as well as any other Authority members and staff
recommended by the Sub-Committee
Description These sessions would be short, one-on-one interviews,
where the consultants would personally discuss the limitations and
desirable direction of the 1984 Marketing Plan with Authority
personnel To the extent possible, we would prefer to hold these
sessions at our offices
Consultant Responsibilities: Woods Gordon will be responsible for
holding these interview sessions as well as recording and collecting
data We expect that Authority staff would actually set up and
arrange the interviews
B-268
- 2 -
Outputs Aside from working notes kept by the consultants, there will
be no physical outputs from this task
-
B-269
- 3 -
2 REVIEW OTHER RELEVANT INFORMATION
Rationale: In addition to the valuable research findings previously
discussed, there will be other useful sources of information that will
have a bearing upon the development of a marketing plan for the MTRCA
(an obvious example is the annual survey data collected by the
Metropolitan Toronto Visitor's and Convention Bureau) In this task
we will examine such available data
Descript ion: We will consult a number of sources to obtain data on
tourist and recreation trends that might be relevant to the
development of the marketing plan for MTRCA. These include
- CGOT, Ministry of Tourism and Recreation
- Culture and Recreation Master Plans
- Our own recreation and tourism work
- Other data sources (eg Visitors and Convention Bureau)
Any relevant findings from this review will be fully documented
Consultant Responsibility: This task will be entirely the
responsibility of Woods Gordon
Outputs Each information source will be fully documented In
addition, for each, we will list what, in our judgement, are the
implications of the information in terms of the critical elements of
product, price, promotion, delivery and research of the marketing
plan This documentation will then be given to Authority staff for
their preparation of the marketing plan
-
B-270
- 4 -
3. DEVELOP OUTLINE MARKETING PLAN
Rationale: In order to ensure that the 1984 Marketing Plan (which is to
be prepared by the Authority) is comprehensive and addresses basic
questions, we will prepare a marketing plan outline which will specify
the format of the marketing plan, the areas to be addressed, and the
key questions to be answered (arising from both the interviews with
Authority personnel as well as the review of other data and the
results Qf the summer survey)
Description: The format of this marketing plan outline will consider
the basic product, price, promotion, delivery and researc~ aspects for
each Conservation area and facility Where a number of solutions and
options are possible, we will present these for consideration by
Authority personnel, along with our suggestions and/or ranking for
each
Consultant Responaibility: This task will be entirely the
, responsibility of Woods Gordon
--- - - - -- -- --
Outputs The specific output from this task will be a "skeleton"
marketing plan It will reflect the ultimate format for the plan, and
contain a number of questions, key points, etc
B-271
- 5 -
4 WORKSHOP/"BRAINSTORH" SESSION
Rationale After initially sorting out our ideas and questions in the
development of the outline marketing plan, it will be useful to
discuss and re-think these aspects, as well as to obtain some fresh
viewpoints on matters To do this we propose a one-day "brainstorm"
or "think tank" session
Description: The session, as we view it at this point in time, would
consist of a two-part day, held in Woods Gordon's Toronto offices
The morning would be devoted to a workshop session, attended by
various outside experts who could act as 'resource' or 'idea' people
The morning session would be hosted by Woods Gordon, who would lead
discussion on a number of points and questions that have emerged up to
this point in the process This morning session would, of course, be
attended by members of the Marketing Sub-Committee, as well as by
selected Authority personnel
After a luncheon (arranged by the Consultants) the external
resource people will leave, and the bulk of the afternoon will be
devoted to a full discussion of the Marketing Plan outline and any
revisions or modifications as a result of the morning session The
basic objective of this afternoon session will be to obtain agreement
among the marketing plan Sub-Committee members as to the outline
marketing plan
Consultant Responsibilities The consultants will be responsible for
sponsoring and hosting this session Authority personnel will be
responsible for making the necessary scheduling arrangements With
respect to obtaining outside experts, we expect that the Authority
...
.
B-272
- 6 -
will identify persons it feels could make a worthwhile contribution to
this brainstorm session We expect to be involved in this process to
a reasonable extent
Outputs Full notes will be taken during the morning and afternoon
sessions A major physical output will be a listing of the ideas,
suggestions and comments that emerged from this session Another
physical output will be a revised Marketing Plan outline, based upon
the comments at the afternoon session
'-
B-273 - 7 -
s. PREPARATION OF KARKETIRG PLAN
Ratiouale At this point, a number of relevant materials will have been
developed, including the results from the summer survey, a review of
other relevant information sources and an assessment of their
implications, and the marketing plan outline This information will
be critical to Authority staff in the development of a first draft of
the 1984 Marketing Plan This, of course, represents the final and
most important output of this entire process
Description: The sequence of events that we foresee in this task is
straightforward Authority personnel will initially prepare the first
draft of the 1984 Marketing Plan, following the marketing plan outline
previously identified and responding to all questions raised Woods
Gordon will then review this initial draft, suggesting changes,
modifications, areas for further elaboration, etc , as appropriate
Authority staff will then prepare a final version of the Marketing
Plan
Consultant Responsibility: The consultants will, of course, remain "on
call" throughout this process Our responsibility will not be to
prepare the Marketing Plan; rather it will be to aid and advise the
Authority in their preparation of the plan
Outputs The output of this task will be a detailed, comprehensive and
relevant 1984 Marketing Plan This product will be assured by virtue
of the nature of the study process undertaken
B-274
SCHEDULE "D"
To The Chairman and Members of the Executive Committee, M T R.C A.
From Mr. R. K Cooper, Administrator, Historical Sites Division
Re Progress Report - April 1 to June 30, 1983
HISTORICAL SITES PROJECTS (Development)
Landscape work at the Sawyer's House has been started with the
laying of new boardwalk and the planting of two trees.
Interior restoration in the Richmond Hill Manse is progressing well.
During April, May and June the building was fully insulated, wired, lathed
and plastered The wood trim was installed and the interior is now ready
for painting and decorating.
HISTORICAL SITES PROJECTS (Operations & Maintenance)
(a) Registration and Artifacts
During the period April 1st to June 30th, a total of fifty-nine
items were accessioned from eighteen donors One interesting donation was
a mechanical toy bank and several old coins Another notable donation was
a handmade Windsor style arm chair from the Uxbridge area
Several items from the Black Creek collection were loaned for an
exhibit relating to an archaeological dig in downtown Toronto
The Registrar has had the assistance of a C 0 E D employee and a
student on the Experience '83 Program
(b) Publicity and Promotion
During the second quarter of 1983 the Village was the locatton for
several commercial photography projects. The Mill was used for the cover
of a book on Canadian wine~ a segment of a documentary on the Earl of Selkirk
was filmed by C B C., Vancouver~ Stedman's photographed a fashion 1ayout~
Eaton's shot the cover picture for their Christmas Gift Catalogue in Burwick
House kitchen~ and Sears used several outdoor locations for their Fall Fashion
Flyer
The Village received newspaper coverage during April, May and June
from the three Toronto dailies, as well as from many of the area weeklies
Jeanne Hughes was interviewed on C.B C Fresh Air, and on C F G M.
Lorraine O'Byrne was interviewed on C K.Q T. Oshawa.
- Vil1age~staff have given numerous lectures and talks during the
second quarter of 1983 Mrs. Jeanne Hughes presented talks to the staff and
volunteers of Century Village, Lang; Hutchison House, Peterborough~ and to
the Mono Mills Historical Society Mrs Hughes also spoke at Ontario
Historical Society seminars on Ontario's Bicentennial at Smiths Falls,
Toronto, London, and at the Annual Meeting of the Ontario Historical Society
in Sudbury Mr Cooper attended the Provincial Bicentennial Conference
sponsored by the Ontario Heritage Foundation He was a guest speaker at the
Pennsylvania German Folklore Society Annual Meeting, and was interviewed
about the Village on radio by Tommy Thompson. He also partic~pated at tfie
official opening of The B. Napier Simpson Jr Room at a Thornhill community
centre.
In June The Metropolitan Toronto and Region Conservation Authority
hired a promotions officer for Black Creek. The successful candidate, Neil
Beaudry, is to begin work on July 4th
(c) Special Events
A large n~ of special events were held at Black Creek during
April, May and June. The Village opened in March with the Taste of Maple
program, and has held a progression of special events since then. They include
(i) Co1ourfu1 Coverlets, a two week display of nineteenth century
bed coverings highlighted by the Canada Packers' Quilt Exhibit
(ii) The Great Easter Egg Hunt held on Easter Sunday The Ontario
Egg Producers Marketing Board donated 100 dozen eggs, and several major candy
companies donated the chocolate and candy treats
,
B-275
- 2 -
(iii) Past-times -- Play-times, a weekend of nineteenth century
amusements providing visitor participation. A kite fly-in sponsored by the
Ontario Historical Society was one of the highlights of this program
(iv) A Spring Fair, which featured a medicine man, jugglers, side-
shows and agricultural exhibits
(v) Dr. Zebediah Zonk's Museum of Scientific Curiosities displayed
in the Town Hall.
(vi) Military Manoeuvres on Victoria Day weekend featured a forty
person Colonial Fife and Drum Corps from Michigan.
(vii) Wonderful Wool highlighted sheep shearing and wool processing
for two weekends.
(viii) Making Wood Work in Pioneer Ontario emphasized the variety
of uses to which the early settlers put wood.
(ix) The lOth Annual Rogationtide Service was held on June 19th.
Bishop Allan Read led the Service, and The Honorable Pauline McGibbon,
Honorary Reeve of Black Creek, participated in the ceremonies.
Several of these events were new programs in 1983 However, it is
difficult to measure their success as very wet weather throughout April and
May deterred many visitors.
During the second quarter of 1983, lS.weddings, 12 wedding receptions,
1 Christening and 1 Church service were held.
td) Building and Grounds Maintenance
- Maintenance during April, May and June included rebuilding and
repairing several sections of rail fences, repairing several sections of
boardwalk; repairing the steps at Roblins' Mill and Dickson Hill School;
grading all Village roads; cleaning hydro transformers; repairing the culvert
at the Harness Shop, and repairing wheelchairs
During the same period regular grass cutting has been maintained in
the Village, the Peacock Woods and at Head Office Six Osage orange trees
have been planted at the Mackenzie House barn area
The Snack Bar has been scraped and painted and the surrounding area
re-sodded or gravelled. Fans have been installed to help control insect
problems. The picnic tables have been repaired and restained and garbage
barrels painted.
A new sign was installed at Keele Street and Stee1es Avenue The
Village parking lot has been re-1ined and curbs painted
Lockers were repaired and painted and set up for C 0 E D. staff
On June 28th the old skate shack/storage building in the lower
parking lot was set on fire and burned to the ground The area has been
cleaned up and all debris removed.
(e) Livestock
The Spring season at Black Creek was busy in the livestock section.
Twenty lambs were born, eight goslings, fifteen ducklings, sixty chicks,
twenty turkey poults and one bull calf Purchases included one cow, eight
piglets' and one turkey gobbler; while two ewes and four pigs were sold
(f) Visitors Centre
The Province of Ontario, through Lottario, has approved a grant of
$1,250,000 00 which will make it possible to complete the total project
Architec~ Gordon Cheney anticipates that plans and specifications will be
ready for a tender call by July 25th.
B-276
- 3 -
EXPENDITURE AND REVENUE STATEMENT
APRIL 1 TO JUNE 30, 1983
EXPENDITURE
HISTORICAL YEAR % OF FORECAST
SITES PROJECT TO DATE BUDGET TO
(DEVELOPMENT) EXPEND BUDGET USED DEC. 31/83
75,449 1,995,000 3.8 1,995,000
HISTORICAL
SITES PROGRA.MS YEAR % OF FORECAST
(OPERA.TIONS & TO DATE BUDGET TO
MAINTENANCE) EXPEND. BUDGET" USED DEC. 31/83
810,043 1,760,322 46.3 1,760,322
REVENUE
1983 RECEIVED % OF INCOME
PROGRA.M BUDGET JUNE 30/83 RECEIVED
1,487,200 272,591 18 3
FINANCIAL COMMENTS
Village attendance to the end of June was 81,869, down 19,667 from
1982 Correspondingly, gate revenues are down by $37,639 00; gift shop
revenue by $13,703.00; and Village outlets by $10,689.00. The cool, wet
weather during most weekends in April and May is largely responsible for the
poor attendance and lower revenues in all areas The very hot, humid weather
in June did not help to improve attendance.
The number of citizens to date in 1983 is 374, compared to 377 at
the same time in 1982
The popular Dickson Hill School Program was fully booked throughout
the Spring season There currently exists a two year waiting list for
participation in this program
1983.08 17 ,
I
,
B-2??
STAFF PROGRESS REPORT
Property Section
During the period April 1, 1983 to June 30, 1983, the Property Section of
the Finance and Administration Division completed the acquisition of 28 new
properties containing 56.750 acres. The total acreage of lands owned by the
Authority, as of June 30, 1983 is 27,867.732 acres.
During the period the property Section spent a considerable amount of time
in the preparation, negotiation, and processing of shoreline management and
erosion control agreements. The Property Section also carried out all of
the administration management requirements in connection with Authority-
owned lands; i.e. agreements, easements, assessments, taxes, leases,
rentals, insurance, etc.
The Flood Homes Assistance Project pertaining to lands acquired by the
Humber Valley Conservation Authority prior to the institution of The
Metropolitan Toronto and Region Conservation Authority, was reviewed and is
now entered in our records.
With assistance from the C.O.E.D. program, we have undertaken to prepare a
complete set of deed plot maps of all Authority-owned properties in all the
watersheds in the Authority's jurisdiction, using the new metric f100dline
maps. To date, mapping for the Etobicoke Creek, Mimico Creek, Highland
Creek, Duffin's Creek and the Rouge River has been completed.
A breakdown of the properties and acreages acquired by the Authority to date
is as follows
ETOBICOKE.CREEK WATERSHED
Flood Control and Water Conservation:
- 2 expropriations settled during period containing 0.970 acres;
- 2 permanent easements
- Etobicoke Creek Flood Plain Lands
- A1ka Developments Limited property,
- P Augustinavicius Property, both located on the north side of
Sherway Drive in the City of Mississauga.
- 1 property sale during period comprising 1.787 acres;
- Snelgrove Dam and Reservoir Lands
- sold to the Ministry of Transportation and Communications for road
widening purposes (1.787 acres)
Total to date--67 properties acquired containing 451.734 acres;
Conservation Area:
Total to date--lO properties acquired containing 418.866 acres;
Total of Watershed 77 properties acquired containing 870.600 acres
MIMICO CREEK WATERSHED
Flood Control and Water Conservation
- 7 properties settled during period containing 6.738 acres;
- 2 purchases
- 5 permanent easements
B-278
- 2 -
- Mimico Creek Flood Plain Lands
- Ministry of Government Services Property, located south of Stee1es
Avenue, west of Goreway Drive, City of Brampton.
- H. & L. Bowman property, located on the east side of Royal York Road,
south of G1enroy Avenue, City of Etobicoke. (1 purchase; 1 permanent
easement)
- W. & E. Wallace Property,
- E. & D. Gi1lelan Property,
- s. & V Peel pr8perty,
- s. & M. Janiszewski Property, all located at the rear of Royal York Road
and Humberva1e Boulevard, City of Etobicoke. (Permanent easements)
Total to date--47 properties acquired containing 91.366 acres;
- 2 expropriations outstanding (permanent easements)
Total Watershed: 47 properties acquired containing 91.366 acres.
HUMBER RIVER WATERSHED
Flood Control and Water Conservation:
- 10 properties settled during period containing 13.314 acres;
- 6 purchases
- 4 permanent easements
- Humber River Flood Plain Lands
-
- Regional Municipality of Peel Property, located on the north side of
King Street East, east of John Street, Bolton, Town of Ca1edon.
- 419540 Ontario Limited Property, located on the east side of Clarence
Street, Woodbridge, Town of Vaughan.
- D. & E. Underhill property, located on the north side of King Street
East, Bolton, Town of Ca1edon. (1 purchase; 1 permanent easement)
- G. & H. Fox Property, located at 40 John Street, Bolton, Town of
Caledon. (1 purchase; 1 permanent easement)
- C.M. Murphy Property, located at 30 John Street, Bolton, Town of
Caledon. (1 purchase; 1 permanent easement)
- P. & C. Terhart property, located at 176 King Street East, Bolton, Town
of Ca1edon (1 purchase; 1 permanent easement)
- Flood Homes Assistance Project
- 2 properties added during period containing 30.023 acres;
- 2 purchases
- Township of Vaughan property,
- village of WOOdbridge property, both located in the Clarence Street
area, Woodbridge, Town of Vaughan.
- 2 property sales deducted during period comprising 2.922 acres;
- sold to the County of York (Toronto & York Roads Commission) for the
relocation of Is1ington Avenue. (0.734 acres)
- sold to the Town of Vaughan for the extension of Willis Road
(2.188 acres)
B-279
- 3 -
- Woodbridge Channelization
- 1 property sale deducted during period comprising 6.966 acres
- sold to the County of York (Toronto and York Roads Commission) for the
relocation of Islington Avenue (6.966 acres)
Total to date--792 properties acquired containing 8,581.680 acres;
Conservation Areas:
Total to date--79 properties acquired containing 4,305.773 acres;
Forest and Wildlife Areas:
Total to date--10 properties acquired containing 786.486 acres;
Agreement Forest Lands:
Total to date--23 properties acquired containing 1,865.745 acres;
Niagara Escarpment Lands:
Total to date--4 properties acquired containing 251.926 acres;
Total of Watershed: 908 properties acquired containing 15,791.610 acres.
DON RIVER WATERSHED
Flood Control and Water Conservation:
- 2 properties settled during period containing 0.222 acres;
- 2 purchases
- Don River Flood Plain Lands
- Gonte Construction Limited Property, located east of Dufferin Street,
north of Stee1es Avenue, Town of Vaughan.
- City of North York Property, located west of Denver Crescent, in the
Sheppard Avenue/Leslie Street area, City of North York.
Total to date--190 properties acquired containing 1,955.034 acres.
- 4 expropriations outstanding
Conservation Area:
Total to date--1 property acquired containing 9.350 acres;
Total of Watershed 191 properties acquired containing 1,964.384 acres.
HIGHLAND CREEK WATERSHED
Flood Control and Water Conservation
Total to date--143 properties acquired containing 823.911 acres;
Conservation Area
Total to date--2 properties acquired containing 118.626 acres;
,
Total of Watershed: 145 properties acquired containing 942.537 acres.
B-280
- 4 -
ROUGE RIVER WATERSHED
Flood Control and Water Conservation
- 3 properties settled during period containing 1.497 acres;
- 3 purchases
- Rouge River Flood Plain Lands
- Town of Pickering Property, located west of A1tona Road, north of
Highway 12, Town of pickering.
- T. & M. Sweeny Property, located on the west side of Rougemont Drive,
south of Highway 1401, in the Lower Rouge area, Town of Pickering.
- D. & H. Walters Property, located on the east side of Rouge Hills Drive,
in the Lower Rouge area, Town of Pickering.
Total to date--122 properties acquired containing 2,109.339 acres;
Conservation Area
Total to date--2 properties acquired containing 267.038 acres;
Total of Watershed: 124 properties acquired containing 2,376.377 acres.
DUFFIN'S CREEK WATERSHED
Flood Control and Water Conservation:
- 2 property sales during period containing 9.485 acres;
- Duffin's Creek Flood Plain Lands
- sold to the Ministry of the Environment in a land exchange.
(9.466 acres)
- sold to the Town of pickering for road widening purposes (0.019 acres)
Total to date--90 properties acquired containing 905.667 acres;
Conservation Area
Total to date--19 properties acquired containing 1,076.568 acres;
Forest and Wildlife Area:
Total to date--16 properties acquired containing 1,749.696 acres;
Agreement Forest Lands
Total to date--1 property acquired containing 93.000 acres;
Total of Watershed 126 properties acquired containing 3,824 931 acres.
PETTICOAT CREEK WATERSHED
Flood Control and Water Conservation
Total to date--l property acquired containing 22.139 acres;
B-281
- 5 -
Conservation Area:
Total to date--1 property acquired containing 177 918 acres;
Total of Watershed: 2 properties acquired containing 200.057 acres.
LAKE ONTARIO WATERFRONT
Waterfront Plan:
- 4 properties settled during period containing 4.956 acres;
- 4 purchases;
- Pickering/Ajax Sector
- Ministry of the Environment Property, located in the Squires Beach area
in the Town of Pickering.
- Scarborough Sector
- M. & M. Freedman Property,
- J. & V. Womers1ey Property,
- A. & B. Burnese Property, located south of Crescentwood Road, east of
Warden Avenue, City of Scarborough.
Total to date--279 properties acquired containing 1,756.440 acres
Conservation Area
Total to date--9 properties acquired containing 49.430 acres;
Total of Lake Ontario Waterfront
288 properties acquired containing 1,805.870 acres.
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
April 1 - June 30, 1983 - 24 properties settled containing 51.794 acres;
(- 15 purchases;
- 9 permanent easements
- 2 expropriations settled during period)
- 6 property sales
Total to date--1,452 properties acquired containiing 14,940.870 acres;
- 6 expropriations outstanding
CONSERVATION AREAS
April 1 - June 30, 1983
Total to date--123 properties acquired containing 6,423.569 acres.
,
B-282
- 6 -
FOREST AND WILDLIFE AREAS
April 1 - June 30, 1983
Total to date--26 properties acquired containing 2,536.182 acres.
AGREEMENT FOREST LANDS
April 1 - June 30, 1983
Total to date--24 properties acquired containing 1,958.745 acres.
NIAGARA ESCARPMENT LANDS
April 1 - June 30, 1983
Total to date--4 properties acquired containing 251.926 acres.
WATERFRONT PLAN
April 1 - June 30, 1983 - 4 properties settled containing 4.956 acres;
(- 4 purchases)
Total to date--279 properties acquired containing 1,756 440 acres.
GRAND TOTAL OF ALL PROJECTS
April 1 - June 30, 1983 - 28 properties settled containing 56.750 acres;
(~ 19 purchases;
- 9 permanent easements;
- 2 expropriations settled during period)
- 6 property sales
Total to date--1,908 properties acquired containing 27,867.732 acres;
(11,278.071 hectares)
- 6 expropriations outstanding
1983.08.19
DO em
B-283
TO THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
M T R.C A - Mtg 014/83
FROM MR J C. MATHER, ADMINISTRATOR - WATER RESOURCE DIVISION
RE WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1983 TO JUNE 30, 1983
The attached progress report is presented for the period April 1, 1983
to June 30, 1983 The report details both the physical and financial
progress of the various programs and projects in the Flood Control and
the Waterfront Sections Also included is a status report on the Fill
Violations as prepared by the Development Control Section
Attachments
1983 08 19
JCMlfs
.
..,
n (Xl H
N
~ I
10
OPERATING STATEMENT PAGE 2
BY PROGRAM PERIOD ENDING 830703 REP 109
E X PEN D I T U RES REV E N U E
__=~_=~_c__=~=_c__=~___=__c=_c_=___==_=~=__=___~==__= _CU_=C=_==_==C_=C======~Q=~==D=_m=mc~c=
M-T-D Y-T-D j(, FUNDS M-T-D Y-T-D j(,
BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD
Ii -=--== =====- -===== :::== __:::z:::r::::=_C1== =~Cl::t== =-:::1::-=- ==m:a== ===m ~
WATER RESOURCE - FLOOD CONTROL
================~=====~=======
ADMINISTRATION-FLOOD CONTROL 743.652 89,603 413,537 55 6 330,115 743,652 2,932- 8,315- 1 1
METRO - EROSION CONTROL 396.500 9,927 106,141 26 8 290.359 396,500 27,900- 7.0
YORK - EROSION CONTROL 23.500 10,121 43 1 13.379 23,500 1,400- 6 0
----
PEEL - EROSION CONTROL 35.600 0 35,600 35,600 0
DURHAM - EROSION CONTROL 5.000 0 5,000 5.000 0
H PLANNING AND REMEDIAL MEASURE 1,343,500 12,047 271,707 20 2 1.071,793 1. 343. 500 0 II
OP & MAIN -------- ----
-RIVER FORECASTING, 119,637 8,479 53.446 44 7 66.191 119,637 0
SMALL DANS, CHAN. & ER CONT 244.000 47.463 132,364 54 3 111,636 244,000 0
----------------------------------------------------- ---------------------------------------
TOTAL 2,911,389 167,519 987,316 33. 9 1.924,073 .R>~t,_~83 ___ _ 2.'_'r3::L-__3Z,_615-__J 3 -- - -
----
----------------------------------------------------- ------------------------~--------------
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL
,I r
------ - -- _.- --- --- - -*-- --- ----- - -----------
- -- - - +---- - -
H h
- --- - ----------- - --- - --
-
-- - --- -- --------
)- OPERATING STATEMENT PAGE 3
0 BY PROGRAM PERIOD ENDING 830703 REP 109
(
'II ~ E X PEN D I T U RES REV E N U E
(
==~==-==-==-==-=-=----===-=--=-=--==--=--=--=--==---- -====-==--======-================-==-==
M-T-D Y-T-D Yo FUNDS M-T-D Y-T-D 7-
BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD
- = .c=-:c-- =--= - =:c= =-====:::: = ====== ====== =::::z:r=== ====
WATER RESOURCE - WATERFRONT
{ =====================c=====
ADMINISTRATION WATERFRONT 211,239 20,331 95,046 45 0 116,193 211,239 351- 351- 2
( CAPITAL DEVELOPMENT 1, 531, 261 245,779 483.297 31 6 1, 047, 964 1, 531, 261 3,950- 4,400- 3
, I \ X SHORELINE MANAGEMENT 582,500 59 2,343 4 580,157 582, 500 0
\
ANCE 0 0
----------------------------------------------------- ---------------------------------------
IUIAL. c.,;J.,!;',vuu "!OO,lFV 580,686 .,!;, u 1,744.314 2.325,000 4.301- 4,751- 2
----------------------------------------------------- --------------------------------------- --
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL - -
I rl
------- - - - +--- -- - -.- --- ------ - - -- - --
,
,
, -~--- -- -. ---- - ----- ._- -- .----------
I \' ~
--- ----- -------- - -----
( ---- -----~
,
I i j
It)
CD
N
I
lJl
B-286
-2-
FLOOD CONTROL
Erosion Control - Metro
Major remedial works have been completed at the Wynford Heights Crescent
site in the City of North York
Private revenues, in the amount of $27,900 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditure for this activity.
Major work at Beaucourt Road is in progress Major work at Delroy Drive
on the Mimico Creek is scheduled for later this year
Erosion Control Peel
Remedial work at Albert Street in Bolton is scheduled for later this
year
Erosion Control - York
Remedial works at Kirby Side Road have been completed
Private revenues in the amount of $1,400 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditures for this activity
MAINTENANCE
Major maintenance in Lower Humber Channels is in progress The
rehabilitation of.the Pa1grave Dam is scheduled to commence in August
of 1983
Regular maintenance of our water control structures has been carried
out within the established budget guidelines.
PLANNING AND REMEDIAL MEASURES
Remedial Works
Channel improvement works have been in progress on the Main Branch of
the Humber River in Bolton Final grading, cleanup and restoration
has recently been completed
The contract for Phase II of the Bolton project was tendered and awarded
to Sonterlan Construction Corporation Work is now in progress
Keating Channel Study
The Keating Channel Environmental Assessment report has been -
formally submitted to the Ministry of the Environment for
their review.
Environmental Planning
Environmental Inventory reports for the erosion control program were
drafted A literature review and mapping exercise of aquifers and
groundwater systems in Uxbridge area was completed A start on the
collection of background data for input into master drainage planning
has been initiated Master drainage planning will be a major activity
throughout 1983
B-287
- 3 -
~~~~g~~
Co1'one1 Samuel smith waterfront Area
- The entrance road paving contract ha~ fieen completed
- The revenue collection control equipment i~ operational
- Landfi11ing commenced on June 1, 1983 but progress is behind schedule
due to limited amount of local construction.
- The number of names on the waiting list for moorings now totals 125.
- The City of Etobicoke, Humber College and the Ministry of Government
Services are all involved in a planning review of the future of the
Lakeshore Psychiatric Hospital
- Detail planning of the final park layout is continuing in conjunction
with Metro Parks Department and Humber College
Humber Bay West
- The contract for paving the expanded boat launching parking lot has
been completed.
- Landscaping around the new launching facility is substantially complete
- The Boating Clubs have all carried out additional landscaping and are
proceeding with plans for Club House construction
- The Mimico Cruising Club has awarded a contract for construction of a
day sailing facility and a service dock.
- Plans for expansion of the total mooring capacity from 500 boats to
700 boats are under review with the City of Etobicoke
- It has been decided to delay the Official Opening of Humber Bay West
Phase II until the Spring of 1984
Aquatic Park
- The Ministry of Natural Resources has leased the endikement area to
The Toronto Harbour Commissioners for completion of the 1andfi11ing
and placement of final armouring
- The legal survey of the limits of the proposed land transactions
between the Province of Ontario, MTRCA and the Toronto Harbour
Commissioners is underway The City of Toronto and the Toronto
Harbour Commissioners have reached agreement on a recreational
corridor along the north shore of the Outer Harbour which has cleared
the way for the City of Toronto to support the transfer of the
Provincial Crown Water10t in the Outer Harbour to the Toronto Harbour
Commissioners
- The Authority's Aquatic Park Planning Task Force has met on 2 occasions
to establish the Terms of Reference for the planning exercise and to
clarify the position of the various agencies represented with respect
to future uses of Aquatic Park and the adjoining land areas
Ashbridge's Bay
- The first phase of maintenance dredging of the channel leading to the
public launching ramps was completed, however a l~rger dredging effort
will be required in 1984 to restore the channel to a safer condition
.
B-288
- 4 -
B1uffer~ Top~ands
- The demolition of the former fi1t~ation plant on Fishleigh Drive has
been completed and ~ite restoration t~ well underway-. Final plans for
improvements to the existing parking area as well as plans for tree
and shrub plantings are being finalized for implementation in the Fall
- Plans are being reviewed for the proposed development of the former
Seminary lands in an effort to address some of the concerns of local
resident~
Bluffers Park
- A contract has been called for paving of the roadway to the easterly
end of the site and the public parking lot adjacent to the swimming
beach
- The Spring planting on the easterly parts of Phase II have been
completed and plans are available for the Fall planting which should
substantially complete the landscaping of Phase II
- All 4 Boat Clubs have completed major improvements to their site,
particularly related to parking and boat storage areas and landscaping
In addition, the construction of the Club House building for the
Bluffers Park Yacht Club is well advanced
- The Master Plan Amendment which proposes a marina facility to the west
side of the boat basin has been approved by the City of Scarborough
and Terms of Reference for the proposal call are being prepared
- Erosion control work in the Sunnypoint Ravine and along the base of
the bluffs adjacent to Phase II is proceeding well
East Point Park
- Detail planning of the road a1ignme~t and parking lot locations as
well as the stream and pond system is under review. In addition, the
details of electrical supply and sanitary sewers are being planned.
It is anticipated that some construction on the roadway and parking
lot will proceed in the Fall.
- The City of Scarborough is reviewing its plans for a playing field
complex at the westerly end of the park Initial construction of the
playing fields is tentatively planned for the Spring of 1984
Ajax Waterfront
- The first phase of planting along the waterfront west of Harwood Avenue
as well as in Pickering Beach has been completed
- Site plans for the Rotary Park area and the lands between Finley Avenue
and Rotary Park have been completed. The Town of Ajax has negotiated
an agreement with Wimpey Canada Limited to implement significant
portions of the park development-along the waterfront adjacent to
Wimpey's Neighbourhood 7
Shoreline Management
- Property negotiations are continuing in preparation for shoreline
protection along Springbank Avenue and Lakehurst Crescent.
- A severe erosion problem has developed along Fallingbrook Drive along
the westerly end of the bluff and plans are being formulated for
protection measures
- Detail design of erosion control measures for the South Marine Drive
area is continuing in preparation for construction in the Fall. In
anticipation of this work, access road improvements are underway along
the frontage of the Guild Inn
B-289 - 5 -
Shoreline Ma'naqement lCont'dl
- A. Project for E~osion Control in Bellamy Ravine was adopted by the
Authority and Metropolitan Toronto Funding arrangements are now under
consideration oy the City- of Etooicoke and the Ministry of Natural
Resources
Environment~l MOnitoring
- The results of the 1982 waterfront monitoring program are being compiled
in report form.
- The automatic temperature recorders monitoring the lake trout shoals at
Bluffers Park were retrieved. Hatching success of the over-wintering
eggs was 0 to 5%, similar to last year
- The 1983 program is underway with Proctor and Redfern Limited completing
sample analyses
- The 1983 field program at Colonel Samuel Smith Waterfront Area is
underway following discussions with the Ministry of the Environment
on sample procedures and fill quality monitoring
/md
.
'IO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE cnlMITl'EE, M. T . R.C .A. I - i 14/8 3
FRG1: JOHN W. MALEl'ICH, ~, DEVElDPMEN1' CDmlOL SECl'IOO
RE: AI:MINISTR1\TION OF CNrARIO REXiUIATlOO pO - APRIL, MAY AND JUNE, 1983.
DETAILS OF VIOLATION NOTICE Em'. OFE ACTION TAKEN
LOCATION INITIALS
TGm of Pickering V-489, Mr. William M. Gerrits Il'l -Ieso1ved as per>IIpemri.t 00. A-945.
IDt 6, Plan 469 April 5, 1983
#1972 Southview Drive 3(a)
Duffin Creek Watershai
TGm of Caledon V-490, Mr. William B. Shields AW -All activity has stowed.
lots 27 am 28, Concession 1E April 5, 1983' -Site restoration is under review by
113206 King Road 3(c) Authority staff.
(Victoria)
llurrber River Watershai
I
Borough of Etd:>icoke V-491, Raynond & Joan Doucet IM -Fill- has been renoved am the C7'I
Part lots 9 am 10, Plan 3347 April 6, 1983 area restored. I
Rear of 1141 Riverview Heights 3 (b)
HlIIlber River Watershed
City of BranptDn V-492, Giuseppe Gi.anoone AW -Resolved by the renoval of the
Part lot 11, Concession 7, EH5 April 14, 1983 watercourse cbstructioo.
llurrber River Watershai 3(c)
TGm of Markham V-493, Mr. Sydney lbpkinson Il'l -Ieso1ved by pezmi.t 00. 8-032.
Part IDt 9, Concession 6 May 17, 1983
118041 Kennedy Road 3 (b)
lbuge River Watershed
FL.
1983 06.30 lJl
I
IV
\D
0
-
-
'1'0: THE CHAIRMI\N AND MEMBERS OF THE EXEXJJl'IVE CCtolMITl'EE, M.T.R.C.A., - i 14/83 tIl
I
N
FOCM: JOHN W MALEl'ICH, MAN1\GER, DEVEIill'MENl' <XNl'RDL SEX:TIOO. \D
t-'
RE AIMINISTRATIOO OF ClN'I1JUO REX>UIATIOO 170 - APRIL, MAY AND JUNE, 1983
ENF. OPE A.CTION TAKEN
LOCATION DETAILS OF VIOLATION NOTICE INITIALS
, -
TcMn of Caledon V-494, Joffrey H. Bellcharrber AW -All activity has stopped.
Part lot 9, Concession 6 Hay 20, 1983 -Site status is under review by
#91 Sackvi11e Street 3(a) Authority staff.
(Bolton)
Hunber River WatershErl
TcMn of Richnond Hill V-495, Alberino 'l\::.tnasone AW -All activity has stopped.
Part lot 66, Plan 2027 June 2, 1983 -Mr Tanasone is preparing a proposal for
# 52 walner Road 3 (b) review by staff within the penni.t process.
[bn River WatershErl
I
TcMn of Vaughan V-496, Peter & Fi1arena I.am.1to I:M -Fill has been renoved and the -..J
lot 7, Concession 5 June 14, 1983 area restored. I
#7710 Islington Ave., 3(b)
Hunber River Watershed
Borough of ScamoroUJh V-497, Albert & Linda Sausik rn -Je301ved by penni.t !D. &-065.
Lot 66, Plan 284 June 27, 1983
#309 West Point Avenue 3(b)
!buge River Watershed
Borough of ScaJ:borough V-498, Jerry & Bruna Reyn rn -Resolved by penni.t !D. &-065.
Lot 65, Plan 284 June 27, 1983
#313 West Point Avenue 3(b)
!buge River Watershed V-499, D. Ptrllister Trucking .
June 27, 1983
3(b)
I. L.
1983.06.30
--
'10: THE CHAIRMtIN 1\ND MEMBERS OF THE EXEXl1I'IVE CXMITTI'EE, M.T.R.C.A., - i 14/83
FKM: JOHN W WILEl'ICH,~, DE.VEI.Ol'MENl' CCNrnOL SOCTICN
RE: AI:MJlUSTRATION OF 0N'I2\lU0 REGUIATICN 170 - APRIL, MAY AND JUNE, 1983.
LOCATION DETAILS OF VIOLA.TION NOTICE ENE' . _ OF.F: ACTION T1U<EN
INITIALS
V-SOO NEVER PRINI'ED.
V-SOl, J~ R:tlitaille 00 -Restoration lIIldezway.
Tam of Markham June 28, 1983
pt. IDt 3, Cbn. 7 3(c)
west side of Hwy. 148 V-502, Dagmar COnstruction Ltd.
R:>uge River Watershed June 28, 1983
3(cl
I
Borough of East York Mr. Art Kovari [M -Fill renDVed in acoordance (Xl
160 [))n Valley Drive with court Order. I
D:>n River Watershed
City of Mississauga V-481, Joserh Kaufman Nil -convicted Provincial Offences COurt am fill
pt. IDt 1, Cbn. 1, sns Enterprises Ltd. ('!be Kitd1en ordered renoved May 20, 1983.
2050 Dundas Street centre) -Site has been restored as per the court
Etobiooke Creek Watershed December 1, 1982 Order am to the satisfaction of the
3 (b) \ Authority staff.
City of Mississauga Pacific Paving of Markham Ltd. Nil -cDnvicted Provincial Offences COurt am
pt. IDt 5, Cbn. 4 EllS &Mr Philip Polioelli (President) fill ordered reroved Haren 7, 1983.
5845 4th Line East ~ 9" 1982 -Fill renDVed in acoordance with COurt Order.
Etobiooke Creek Watershed 3 (b)l
/'1.#
1983.06.30 III
I
. N
\D
N
B-293
TO: The Chairman and Members of the Executive Committee, M.T R.C.A.,
Meeting #14/83 - Wednesday, August 31, 1983
FROM T. E. Barber, Administrator, Information and Education Division
RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT
April ~ - June 30, 1983
CONSERVATION INFORMATION SECTION
The Conservation Information Section carries out the Authority's general
information program, as well as programs relating to the resource
management activities and the marketing of the Authority's revenue
generating facilities - Black Creek Pioneer Village, the Kortright Centre
for Conservation and the Conservation Areas, in addition to the marketing
enhancement program funded by the Canada/Ontario Employment Development
Program.
COMMUNITY RELATIONS - INFORMATION - GENERAL
Printing Highlights
- the 1983 Directory was printed and distributed
- printing and distribution of the Authority's 1983 Calendar of Events
and Activities (Summer and Fall) have taken place (25,000 copies)
- news and photo releases were printed and distributed, regarding the
Canada/Ontario Employment Development Program, the Boyd Archaeological
Field SchoOl, the Residential Summer Course, Notice of Public Meeting
at Kortright, Reforestation Services and the Foundation's Election
of Officers
- production and distribution of "Highlights" for the period January 1
to April 30, 1983.
Tours and Special Days
- staff organized and carried out arrangements for
a) the Authority's Annual Sugaring Off Party, for members and staff,
held at the Kortright Centre for Conservation on Saturday, April 9,
1983
b) Sod Turning for the Etobicoke Board of Education Dormitory at the
Albion Hills Conservation Field Centre on Monday, May 9, 1983
c) Tenth Annual Honour Roll Awards Presentation on Friday, May 13,
1983
d) tour for Scarborough Council Members and Senior Staff on June 23,
1983
e) tour for the Flood Control and Water Conservation Advisory Board
on June 28, 1983
f) the Annual Garden Party on Wednesday, June 29, 1983.
Special Programs:
- considerable staff time was required for interviewing candidates
and for the subsequent selection of the Village Promotions Officer
- staff spent extensive time working with the Foundation on their
special fund-raising campaign for the Visitors Centre
- distributed 2,000 General Brochures to residents of Mono and Adjala,
through special mail-outs.
Audio-Visual Highlights
- staff wrote and prepared a major slide show, which was presented by
Kortright Centre staff to the Board of Directors of the Canadian
National Sportsmen's Shows on Friday, June 24, 1983
B-294
- 2 -
COMMUNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT
Printing Highlights:
- distribution is underway of the revised Valley and Stream Regulations
and the Waterfront Regulations, and French translations are available.
They have been delivered to municipal offices and consultants, and have
also been distributed at the mall promotions.
Audio-Visual Highlights:
_ staff set up a resource management exhibit at the Scarborough Town
Centre, during Environment Week in June.
COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING
Printing Highlights:
- mass distribution is underway of the Black Creek pioneer Village
Brochure, Conservation Area Map, Calendar of Events, General Brochure,
flyers and posters, and is being carried out by an Experience '83 staff
member
_ the Black Creek Pioneer Village Walkaround Tabloid was printed in April
_ the posters promoting Black Creek, Kortright.and the Conservation
Areas have proven to be very popular, as distribution continues
throughout the watershed. The Black Creek Pioneer Village poster
has now been distributed for display in the Liquor Control Board of
Ontario outlets in the region.
_ Brochures Unlimited continues to distribute the Black Creek, Kortright
and Conservation Area Brochures in the Metro region, and throughout the
Niagara Peninsula in the case of the Black Creek and Kortright
Brochures
- since May, an Authority enclosure has been sent out with the City of
North York's water bills. This program will continue every two weeks
until the end of August. Adja1a and Mono also participated in this
type of program.
_ staff prepared and distributed 12 news releases, 2 photo releases,
13 synopses and 17 flyers, identifying and promoting programs at the
Village, Kortright and the Conservation Areas
_ the Miracle Food Mart grocery bag promotion, for Black Creek Pioneer
Village, was completed during this period and 1 1/2 million bags were
printed and distributed
- the Authority subscribes to the MacLean Hunter Press Clipping Service
and, for this period, received approximately 860 press clips, which is
only a sample of the coverage the Authority receives.
Special Programs:
_ staff attends regular meetings of the Attractions Council of the
Metropolitan Toronto Convention and Visitors Association
_ considerable work and planning went into developing the Visitors
Survey, which is underway at all of the Authority's public use
facilities
_ the telephone answering sales program on evenings, weekends and holidays
has proven to be very successful. As a result, this program will
continue for the rest of the year.
_ Teleguide units have been installed at Black Creek Pioneer Village, the
Kortright Centre, Indian Line Tourist Campground and the Head Office
- the multilingual television station, Channel 47, began a 13-week
promotion on the Authority's recreational facilities during the first
week in June
- the word processing equipment is now being used to enhance the
marketing of our facilities and programs.
B-295
- 3 -
Audio-Visual Highlights
- summer television promotions were sent to all the Southern Ontario
television stations, promoting Black Creek, Kortright and the
Conservation Areas
- arrangements were made and exhibits were set up at
- Scarborough Town Centre
- Shopper's World (Danforth)
- Cloverda1e Mall
- Towne & Count rye Square
- Bayview Village
- Eaton Centre.
Advertising and Promotion:
- arranged for special publicity features with
a) Ontario Crafts Council - Ontario Craft Magazine
b) Federation of Ontario Naturalists - Seasons
c) Canada Century Home
d) Canada's Wonderland - Around Canada's Wonderland
e) Region of York - York Region Travel Guide
f) Metropolitan Toronto Convention and Visitors Association _
Happenings, Guide Map, Discovery Guide
g) Region of Durham - Travel Guide
- participated in "New York Sales Blitz", arranged by the Central Ontario
Travel Association, June 6 - 8, 1983 (Black Creek Pioneer Village)
- participated in "June Familiarization Weekend - Marketplace" at the
Westin Hotel, June 24, 1983 (Black Creek and Kortright).
Canada/Ontario Employment Development Program:
The Authority's Marketing Program has been substantially enhanced with
the hiring of one Project Coordinator and five staff members under the
Canada/Ontario Employment Development Program. These employees will
carry out an extensive Visitors Survey throughout the summer and will
also distribute literature and staff exhibits, as well as monitor
visitor trends in the autumn, winter and spring.
,
CONSERVATION EDUCATION SECTION
Kortright Centre for Conservation:
- attendance for the first six months of 1983 was over 45,000 visitors,
right on target for the projected annual attendance of 90,000
- exhibits by prominent wildlife artists and photographers are becoming
very popular with visitors; during this period there was a wildlife
photographic exhibit by Erica Thimm 'and a wildlife art exhibit by Ralph
and Pauline Brunner
- amongst a wide variety of programs attractive to all ages and interests
were Photo Hikes, Planting for Wildlife, Rain Runoff and Rivers, Wildlife
and Art, Moccasin Walk, Wildflowers, Bees, etc.
- some of the special events scheduled at Kortright during this time were
several wedding receptions, business meetings and lunches, an APEO dinner
arranged by the Ministry of Natural Resources, a retirement party for a
prominent member of the local community, several Professional Development
Day programs for teachers, private banquets, a Boyd Master Plan Open House
for the community to see the proposed plans and register both verbal and
written comments with Authority staff, etc.
- the continued development of several projects, thanks to a variety of
government sponsored, labour-intensive, programs and funds raised by the
Foundation and by various Ministries
4.
B-296
~ 4 -
- participation in the C.O.E D. Program which, to-date, has resulted in
the completion of the gatehouse, the construction of the energy house,
the completion of the marsh boardwalk, the construction of a staff
room, windows and viewing stand at the sawmill; and renovations to the
pump house
- the Renewable Energy Theme indoor exhibit component is complete, as per
approved plan; and the outdoor energy trail concept and plan has been
approved for development - to begin immediately and progress in several
phases
- implementation of the plan by Landplan Collaborative Ltd. for the central
core area (including the construction of additional eating facilities)
will begin in the fall of this year
Day Programs
- during this academic year both the content and quality of Cold Creek
Conservation Field Centre education programs have been upgraded to an
exceptionally high level; several new programs for intermediate and
senior level students are being prepared for the fall/winter season,
with a resource management component as a part of each program;
details for a senior level rifle range program have been finalized
between the Co~servation Land Management and Information & Education
Divisions, with the program scheduled for implementation in the fall
- at Black Creek Pioneer Village the spring season was extremely busy,
with just under 22,000 students from greater Metro area and across
the province, and from the border states of the U.S.A. participating
in a variety of historical tour programs; as well, the Pioneer Life
Program was fully booked with the two largest participant groups being
from Scarborough and Metro Separate Boards of Education;
Again, York University cooperated in a joint program for senior students
entitled "A Trip in Time";
The volunteer component of the education staff continues to provide a
vital service to the Village education programs.
Residential Programs
- the residential centres continue to operate at about 90% occupancy
- in addition to the usual groups of elementary and secondary level
students and teachers, there have been several senior level student
, groups from private schools, two secondary level leadership training
programs, a Rotary Club, a Junior Farmer group, several Brownie and
Girl Guide groups, and a special Art Group from the North York Board
of Education
- all staffing requ~r~e~t~ for ~h~ ~983/84 academic year have been filled
and include the additional hiring of a Supervisor, three rnstructionaT
staff, three residential assistants and one seconded staff
- the C 0 E.D Program at Albion Hills Field Centre has provided labour
and materials to complete the extensive maintenance program for the
exterior of the Centre building, as well as several smaller projects
- the C.O.E.D. Program at Lake St. George Field Centre has provided
labour and materials to complete the exterior barn renovations, the
construction of a boathouse and dock, walkways, landscaping and several
smaller projects.
Etobicoke Environmental Education Centre - Albion Hills
- the Etobicoke Board of Education held a Ground Breaking Ceremony on
site, to mark the commencement of the construction of its outdoor
education centre; completion is scheduled for early in 1984
- the Advisory Committee, made up of members from both the Etobicoke
Board of Education and the A.uthority, has met and selected a Supervisor
and teaching staff
- the new centre will accommodate about 70 students and accompanying staff,
and will be used primarily by Grade 7 students from the Etobicoke Board
of Education
. . 5.
B-297
- 5 -
FINANCIAL COMMENTS
All expenditures and revenues appear to be on target.
The 1983 budget for the Renewable Energy Program at the Kortright
Centre for Conservation is $183,492, of which $77,607 has been spent
to June 30, 1983 N2 3%) and $105,886 is available to the end of the
current agreement between the Authority and the Ministry of Natural
Resources (March of 1984)
.
PH/AH/mrp
1983.08 24
~
~ ~_----r.--~ ,,--------..- ---:-- ---..----.--.- ----
.
00
'"
N
I
> l:ll
OPERAll~G &lAl~M~NI ----- -- PAOE 5 -
0 BY PROGRAM PERIOD ENDINg 830703 REP 109
I' 8 E I PEN D I T U RES REV E N U E
r ~ - --- - --
c~aDm~~=C==Da.a..=.~.c=aa=amca=acama===~2===C==~===Z= K=~=a======amme~maaa.e=a===-~=~==a=====
I'I-T-D V-T-D X FUNDS I'I-T-O V-T-O X
( BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ACTUAL RECD
___a -... IIIJ:lC CRlSa aroma:: _m__.a ccsa.l::Is __.a:::aaa aClClD
INFORMATION ~ EDUCATION
( ma=mm~=m=a.mc.c_..._D__
~DMINlS1RAIJON - I & E 41:),;.3/0 4;J,106 1~~.167 47 0 ~2(J.~---41!, 370 246- - - ---- 240- i
( COMMUNITY RELATIONS - INFORMA 80.127 2,387 16,877 21 1 63,250 80. 121 0
\ I K COMMUNITY RELATIONS - INFORMA 11.000 0 11,000 11, 000 0
( III RELATIONS - INFORMA 410.24;J a,:)tl6 4il.~5~ 47 6 4h284 90.243 -- - -- - - - - 0
I FIELD CENTRE - OPERATIONS 1.273.083 93,697 ~. 101 39 9 164.982 1. 213. 093 76.'10- 491.086- 38.6
KORTRIQHT 442,000 39,484 219.333 49 6 222.661 442.000 18,'23- 132,021- 29 9*
14,800 ---- --- - -- - -- 0
-
----------------------------------------------------- ---------------------------------------
1 \ I , , , .
----------------------------------------------------- ---------------------------------------
ENCUMBERANCE'S ARE NOl INCLvu~u I~ JH~ A~'UAL ---
RORTRIGHT - RENEWABLE
r ENERGY PROGRA.M 183,493 77 , 607 42 3 105,886
___ __4__
*Ooes not ~nclude Mun~c~pa~ Levy. Provincial Grant and interest on the Growth Endowment Fund
(6 months of the year)
1 \1; ~
. l
<.. ---
- - - - - --
I
,I B
B-299
TO The Chairman and Members of the Executive Committee, M T R C A
- Meeting 014/83
FROM P B Flood, Administrator
Conservation Land Management Division
RE Conservation Land Management Division
PROGRESS REPORT
PROGRAM ADMINISTRATION
The written portion of this report covers events, activities and project
accomplishments to August Reporting dates for statistical data are noted
Considerable administative staff time continues to be spent in coordinating
projects under various special employment projects
The largest project, COED ($820,000 and up to 57 employees) commenced in April
and progress on projects is well underway CCDP Programs are continuing in
York-Peel and Brampton-Georgetown ridings The Ontario Riding project has
concluded The Experience '83 program commenced in May and employed 26
students on various projects through August
Under the Provincial Works Sector Program, the Fisheries Enhancement and Parks
Sector projects concluded in May The Forestry Stimulation project continues
and a new project - Conservation Area Improvement _ is just underway
WATERSHED RECREATION - PLANNING
On June 28, the Authority held a second public open house for the Boyd Master
Planning Study The purpose of this meeting was to provide the public, interest
groups and government agencies with an opportunity to review and comment on the
five alternative concept plans prepared for the Area
Approximately 50 people attended the open house The many comments received
were tabulated and sUbsequently included in the analysis of the concept plans
For comparative purposes, each plan was also evaluated according to how well it
met the Authority's goals and objectives for the Area, its potential impact on
the environment and its overall economic viability
The study team is currently working on the development of a preferred plan for
the area This plan will be presented to the pub1ic'at the third and final open
house at the Kortright Centre on September 15.
In addition to the Boyd Master Plan, staff, with the assistance of the COED
program, are preparing Master Plans for the remaining Conservation and Forest and
Wildlife Areas To date, work has concentrated on Albion Hills and C1airevi11e
Conservation Areas
A graphics designer hired under the recently approved Parks Sector Work Program
will enable trre Authority to prepare much needed area directional maps The
first of nine of these maps has been completed for C1airevi1le.
WATERSHED RECREATION - DEVELOPMENT
All necessary approvals required for the development of a Supervisor's
residence/control building at Indian Line Campground and a washroom and picnic
shelter complex at Albion Hills were finally received in August Construction
of these facilities is to begin immediately
A number of smaller development projects were completed with labour and materials
provided by the COED program. These projects included an equestrian centre at
Clairevi1le, curbing and paving of the turning circle at Indian Line and repairs
to the Greenwood and C1aireville refreshment booths
Work on an extension to the trap range building at Cold Creek and restoration of
the grist mill at Bruce's Mill is ongoing
PROGRESS REPORT B-300
PAGE 2
The COED program has also provided the Authority with an opportunity to update
and standardize Conservation Area signage To date, a detailed inventory of all
existing signage has been completed Production of new signs is underway using
a recently acquired routing machine The painting of several Authority
buildings has also been undertaken using COED labour
WATERSHED RECREATION - OPERATIONS
During the first quarter of 1983, the usual 6 Conservation and 2 Forest and
Wildlife Areas were open for public use Due to the abnormal lack of snow
normal winter recreation activities were not possible. The Albion Hills and
Bruce's Mill ski programs were able to offer limited facilities on 3 and 2
weekends respectively. Only 5 groups at Albion Hills and 2 groups at Bruce's
Mill were able to participate in the instructional program In an effort to
reduce costs ski staff were released early. None of the scheduled winter
Special Events were held
The monthly Retriever Trials commenced in March at both C1aireville and Cold
Creek. The Bruce's Mill Maple Syrup Demonstration began the first weekend of
March, a week earlier than usual Attendance for organized school tours was
4281, a decrease of 502 over last year General public attendance was 14,249,
an increase of 507 over 1982
During January, the annual delivery of 45,000 Rainbow Trout fry was received at
the Glen Haffy hatchery. This fish will provide the "Put and Take" stocking
supply for the Glen Haffy ponds, Heart Lake and other Areas in 1984. In July, a
successful "Fish Derby" was held with 8 lucky anglers catching tagged fish and
winning pr~zes donated by Molson's and Ruko Canada
The lack of winter recreation activity permitted-Area staff to carry out more
than the usual amount of routine maintenance and repairs to buildings, grounds
and facilities. This work was augmented by 2 Special Employment programs At
Bruce's Mill, 2 young workers were employed under the Winter Experience Program
to assist with maintenance and program preparations At C1airevi1le, Heart Lake
and Boyd Areas, 2 3-man crews started work under the 1983 Canada Commun~ty
Development Program (CCDP) These workers assisted with building and picnic
table cleaning and painting and also accomplished considerable landscape tree
pruning in picnic areas This program continued throughout the summer and
expanded to all Areas
Under the Authority's COED program, 10 workers have bee~ hired to assist
Conservation Area staff with regular operations and maintenance These
additional workers have assisted in upgrading maintenance standards to levels In
previous years A crew of 3 workers is at Indian Line Campground carrying
out new planting and maintaining all p1antings They also assist in all ground
maintenance work at the campground
The Experience '83 program has provided 2 crews of three students to work on
Area nature trails At C1airevi11e and Heart Lake, pruning and surfacing has
been completed along with preliminary assessment of the Albion Hills trail The
eastern crew has completed pruning and surface improvements to trails at
Bruce's Mill, Greenwood and Petticoat Creek. An additional 13 students have
been employed as gate and boat concession attendants
At Cold Creek, 69 people attended the four Hunter Education Courses conducted by
the Area Superintendent. In response to demand, section staff, in consultation
with I&E Division staff, have revamped the Shooting Skills Program for school
groups and this program is being offered to grades 7 and up in September.
During the winter, Sporting Clubs have used the ranges for 2 "Ham Shoot"
competitions The Upper Canada Rifle Association has held a monthly event
during April - June In June, the National Golden Retriever Trials were held at
Cold Creek The Radio Controlled Flying Club of Toronto hosted it's annual
Fly-In in early August
All Areas were in operation for summer activities by early May' with the 7
swimming areas opening as scheduled the first weekend of June During July and
early August, high bacteria counts resulted in the closing of Boyd, C1airevi11e
and Bruce's Mill swimming areas Bad algae growth at Heart Lake has also forced
periodic closing of that swimming area
At Heart Lake, a public boating program was established opening the lake to
private non-motorized water craft The weekend ORCA canoe instruction programs
at Claireville have again been well received with 58 participants attending the
8 courses
B-301
PROGRESS REPORT
PAGE 3
In an effort to reducing operating costs, the group (school) instructional
program was dropped However, equipment has been rented to 3 groups to run
their own program The C1airevil1e water ski site has been used for 4
tournaments including the Ontario Championships
At Albiorr Hills, the Rambling Hills Riding Club has held their monthly horse
show The new public riding program at Clairevi11e began operation in June. To
date, user comments have been very favourable and attendance is growing
During the winter, Petticoat Creek staff again carried out the annual inventory
of all Authority vehicles and equipment and the annual inventory for the Land
Management Division of all Area tools, equipment and furnishings Division
staff have devoted considerable time to preparation and processing of Tenders
for the Authority's acquisition of replacement vehicles, tractors and equipment.
All items ordered including 5 r~p1acement trucks and 4 tractors, have been
received.
Through the winter, Division staff organized a training seminar on Chainsaw
maintenance and safe "felling" techniques. This program sponsored by the
Ontario Pulp and Paper Makers Safety Association was attended by staff from
various Authority locations and has been very favourably' received by all
attending. It is a valuable addition to the Authority safety program A
tractor maintenance seminar sponsored by the Ford Motor Company was held for
operating staff involved in tractor operation Two Conservation Area
supervisors and the Safety Officer attended the MNR Enforcement Course and
successfully passed the test requirements. They will be eligible for future
appointment as Provincial Offences Officers to enforce the Authority's
Conservation Area Regulations. In early July, all lifeguard staff attended a
two day cardio pulmonary resucitation course to improv! the level of lifesaving
skills available for emergencies.
Division staff have been actively involved in promoting Area recreation
facilities by staffing displays at the Camping on Wheels and the Canadian
National Sportsmens Shows Emphasis in both displays was on Conservation Area
recreation facilities. Revisions have been completed and updated information
pamphlets printed for campground operations, boating programs and range
operation Copy for the individual Area brochures was revised in preparation
for printing The Bruce's Mill and C1airevi11e brochures are available with
other Areas to follow shortly Considerable input was provided by Division
staff into the preparation of the new wConservation Areas Brochure" This
brochure has been well received by Area visitors.
The following table shows Area attendance for the period January 3 to July 31,
1983 It shows a decrease of 39,725 people or 5 3~ over the same period in
1982. Spring and summer attendance is up but not sufficiently to overcome the
loss of winter attendance. Swimming area closings have hurt summer attendance.
ATTENDANCE AT CONSERVATION AREAS, JANUARY TO JULY 31, 1983
1983 1982
ALBION HILLS 84,656 113,552
BOYD 104,625 105,498
BRUCE'S MILL 109,012' 118,974
CLAIREVILLE 95,422 103,244
COLD CREEK 20,933 18,760
GREENWOOD 41,05T 46,516
HEART LAKE 74,437 62,991
PALGRAVE' 334 9,509
PETTICOAT CREEK 102,628 77,835
WOODBRIDGE 9,501 8,871
704,823 744,548
PROGRESS REPORT B-302
PAGE 4
CONSERVATION LAND MANAGEMENT PROGRAM
Job creation programs funded by the Federal and Provincial Governments have
enabled the Authority to accelerate resource management projects on Authority,
public and privately owned lanqs within the watershed
On Authority owned lands, staff hired under the Canada Community Development
Program and the Parks Work Sector Program carried out woodlot and plantation
management programs in the following locations Bolton Resource Management
Tract (201 cu m 156 cords of firewood), Glen Haffy Forest and Wildlife Area (432
cu m 1120 cords of pulpwood and 1600 meters of fireguard maintenance), Glen
Major Resource Management Tract (1500 meters of firegaurd development) The
Bruce's Mill Conservation Area produced 45 cu m./12 cords of firewood this past
winter Since May, staff on the COED and Forest Stimulation Programs have
continued with forest management Four hectares of plantation in the Glen Haffy
Forest and Wildlife Area have been thinned. An estimated 400m3 (110 cords) of
pulpwood has been produced
Under the Fisheries Work Sector Program, which started in the fall of 1982,
staff developed and posted 8 km of fishing trails in the Bolton Resource
Management Tract and 4 km. in the Claremont Forest and Wildlife Area Six
fishing piers were also constructed for the Clairevil1e Conservation Area It
is anticipated that the installation of these piers will enhance the fishing
opportunities in the reservoir
This summer, the Authority took part in the Conservation Services Experience
'83 Sub-Program Four hundred meters of cold water fish habitat was improved on
one private property located on the Humber River Eroding streambanks were
stabilized and artificial bank covers, deflectors and in-stream boulders were
installed An 80m eroding bank on a second private property was also stabilized
Waterfowl habitat was enhanced by erecting wood duck nesting boxes in the
Palgrave Forest and Wildlife Area
The Authority has worked in co-operation with Save Our Streams, an organization
dedicated to enhancing fisheries habitat To date, they have completed stream
improvement projects in trye Claremont and Palgrave Forest and Wildlife Areas
Yet to be completed is a similar project in the Glen Haffy Forest and Wildlife
Area
Reforestation projects have been completed on Authority lands with 50,000
seedlings planted at the Glen Major Resource Management Tract, 6,000 at the
Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and
Wildlife Area Boy Scout groups have planted 10,000 seedlings at the Bolton
Resource Management Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at
the Boyd Conservation Area, and 10,000 at the Glen Major Resource Management
Tract
As part of the Resource Management Tract program, fireguards have been
maintained in the Glen Major, Goodwood, Glen Haffy and Palgrave Areas Eight
hundred meters of fencing have been constructed in the Bolton Resource
Management Tract to control unauthorized motor vehicle access
Planning projects for resource management programs on Authority owned lands are
also underway Regular Authority staff and those on the Forest Stimulation and
COED Programs have prepared forest management plans for the Albion Hills
Conservation Area, Palgrave Forest and Wildlife Area, Glen Major, Nashville and
Bolton Resource Management Tracts Forest management plans for the Cold Creek
Conservation Area and Goodwood Resource Management Tract are presently being
finalized
An Authority land reforestation inventory has been prepared which summarizes all
plantings on MTRCA property from 1957 to present Staff are continuing to
inventory and assess watercourses on Authority property A stream improvement
management plan on a watershed basis will be developed and Experience '83
Programs have provided the staff for this project
Resource management plan preparation will continue throughout 1983 for Resource
Management Tracts, Forest and Wildlife Areas and Conservation Areas
Agricultural rental reviews have been carried out on ten Authority lands to date
in 1983
B-303
PROGRESS REPORT
PAGE 5
The Authority's 1983-84 Parks and Work Sector Program has now been approved
Fencing projects will be undertaken in the Bolton, Snelgrove and Nashville
Resource Management Tracts as well as the C1aireville Conservation Area It is
anticipated that 2600m of fence will be constructed Forest Management work
will also continue as part of this program Sites include Palgrave Forest and
Wildlife Area and Glen Major Resource Management Tract.
Approximately 47,525 reforestation trees wer~ planted this spring for 20
landolllTlers 12,763 wildlife shrubs and 2,723 trees were planted for 49
landowners this spring under the Tree and Shru~, and urban Wildlife programs. A
further 2,945 shrubs and 1,010 trees will be planted this fall for 19
landowners ~ Total p1antings for this year will total 15,708 wildlife shrubs and
3,733 trees One Conservation Plan has been completed with four applications on
file To date', 34 Conservation Plans have been completed for private
landowners. One application for a reforestation subsidy is on file for 19,500
trees ~ The tree spade was used for 2 private land tree moving projects this
spring and 4 are on file for this fall.
Under Private Lands Assistance Programs, 88 site visits have been carried out to
date to provide technical advice on tree planting programs, pond advice, and
urban wildlife.
Planting activities for private lands programs include continuing inventory of
past assistance programs, a land use review of major watershed to priorize
project locations throughout the watershed and a continued agricultural land use
review
Staff have currently been working on programs for ESA management on Authority,
private and public lands. To assist in this project, both a priority and
preservation list of ESAs have been prepared This priority list was based on
research of existing information and communication with other staff and agencies
and categorized ESAs on their need for management due to present and potential
impacts Presently, 23 ESAs hav~ been field inventoried for impacts and a
management strategy for each has been prepared indicating recommendations for
the management of these ESAs
These management strategies will be incorporated into resource management plans
where required; will aid in identifying priority areas for the private landowner
assistance programs; and will be utilized during discussions with public
agencies
Promotion for Services Programs has included to date the circulation to cable
T V outlets a video tape of the Conservation Services slide presentation and
news releases for various assistance programs A slid~ presentation on the
Density Bonus Program will be completed in the near future
Inventories have been completed for 90$ of the primary and secondary
watercourses within Metro Toronto and surrounding municipalities for the
Authority's Urban Management program Three planting projects have been
completed for the Rouge and Don Rivers and Highland Creek Two hundred and
ninety-five trees and 1,300 wildlife shrubs have been planted In addition,
approximately 200 meters of valley slope has been graded and hydro-seeded at the
Etobicoke General Hospital along the Humber River Plantings have also been
carried out for the City of Brampton with 4,450 seedlings, 100 trees and 890
shrubs being established. Six additional. si,tes ar~ scheduled for the fall under
the COED program. Approval in principal has been reached with the City of
Brampton for a joint project to b~ conducted in the spring of 1984 on public
lands
Landscape projects have been carried out at Humber Bay West, Ajax Waterfront
Area and Bluffer's East wacerfront development projects. Tree maintenance
projects have also been carried out Projects were also carried out as part of
the Bolton channelization project and the South Thackeray Sanitary Landfill
Site
The Authority nursery program supplied trees and shrubs to various tree planting
and landscape projects as well as to the Flood Control Section, MNR, South Lake
Simcoe, and Kawartha Lakes Conservtion Authorities and Save Our Streams Under
the COED program, staff have assisted in accelerating th~ production of plant
material used on job creation projects
B-304
PROGRESS REPORT
PAGE 6
FINANCIAL STATEMENT
YR TO DATE ~ BUDGET
EXPENDITURES EXPENDITURES BUDGET USED
Administration 365,422 673,204 54.0
Watershed Recreation Planning 16,644 75,000 22 0
.
Conservation Area
Deve10pmen t 21,296 181,960 12 0
Operations & Maintenance 1,050,153 2,149,000 49.0
Conservation Land
Management Planning 63,743 118,500 53.8
Conservation Management 160,692 309 , 181 52 0
Fish Rearing 2,988 10,500 28 5
Operations - Non-Revenue 19,083 31,000 61 6
REC'D. TO ~ BUDGET
REVENUES 1982 BUDGET DATE REC'D
Operations & Maintenance 1,016,000 330,156 32 5
Conservation Management 1311,000 76,474 24 7
.
FINANCIAL COMMENTS
PROGRAM ADMINISTRATION
Spending levels indicate that the benefits portion will be over budget
by approximately $18,000 This is a result of a much greater increase
than anticipated for premiums ($14,000) and budget reduction for gapping
($4,000) Reductions in spending in the Central Services, Conservation
Services and Conservation Planning programs have been made to cover $14,000
of this projected deficit
PLANNING & DEVELOPMENT
The Boyd Master Planning Study is on schedule and within budget
The Access for Disabled Program was under spent due to weather conditions
and actual costs for the Petticoat Creek shower facility which were less
than originally budgeted
Work on the two major development projects has not begun pending technical
approval from Ministry of Natural Resources
CONSERVATION AREA OPERATIONS
June projected spending to year end indicated expenditures would be under
budget The amount however was not sufficient to offset the severe impact
of lost revenues from the winter period The loss of swimming in key
Areas prevented any chance of increased summer revenues to overcome the
shortfall
Area Superintendents are currently examining their spending projects to
reduce costs by approximatelky $46,000
CONSERVATION LAND MANAGEMENT
Expenditures for all programs are in line for this time of year Revenue
estimates will be met following fall programs
~ B-305
,
the metropolitan toronto and region conservation authority
minutes REPORT #15/83
EXECUTIVE COMMITTEE 14-SEPTEMBER-1983 #15/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 14 September, 1983.
PRESENT FOR THE HEARING
Chairman Mrs. F.E Gall
Vice-Chairman E V Ko1b
Members E. Fulton
Mrs L. Hancey
H C. Lawrie
S.A Macpherson
(For W.G. Barber) L. Martin
Ms. S Nimmo
J S. Scott
Following the roll call, the meeting recessed to hold a hearing re
Car1ro Holdings Limited
City of Mississauga
Etobicoke Creek Watershed
PRESENT FOR THE MEETING
Chairman # Mrs F E. Gell 0
Vice-Chairman E V Kolb
Members M W H Biggar
E. Fulton
Mrs L Hancey
H C Lawrie
S A Macpherson
(For W G Barber) L Martin
Ms S Nimmo
J S Scott
ABSENT
Members W G Barber
Mrs N Stoner
MINUTES
Res #237 Moved by J S. Scott
Seconded by: S A. Macpherson
THAT the Minutes of Meeting #14/83 be approved.
CARRIED.
SECTION r
NO ITEMS
SECTION II
FOR CONSIDERATION
Mr W A McLean, Acting General Manager, informed the meeting that a Flood Plain
Criteria Review Committee has been appointed by the Ministry of Natural Resources
A public hearing will be held on 3 October, 1983, and written submissions are being
requested by October 31
B-306 -2-
Mr McLean emphasized the seriousness of this matter, and recommended that the
Authority present a brief to the Review Committee
Res 238 Moved by L Martin
Seconded by H C Lawrie
THAT the staff be directed to prepare a brief for presentation to a hearing
by the Flood Plain Criteria Review Committee
CARRIED
1 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res 239 Moved by Mrs L Hancey
Seconded by S.A Macpherson
,
THAT the applications listed herein as A(ll to I\( 4) inclusive, be approved
subject to the conditions contained in the reports
CARRIED
A(ll Ganymede Investments Ltd
To construct temporary diversion ditch and siltation pond, north
side Highway #7B, east of Bathurst Street (Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Site preparation, top soil stripping, and rough grading plan,
Drawing #Al-83740-SK1, as prepared by Proctor & Redfern Limited
A (2) The Municipality of Metropolitan Toronto, Parks Department
To construct washroom/changeroom building, mouth of Rouge River
west side, south of C N R , City of Scarborough (Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan, Job #83103, Drawing No One prepared by
William Saccoccio, as revised
A(3) Harrington & Hoyle Limited (for Dr R Schneider)
To rehabilitate and stabilize valley side slope, rear Lot 35,
R P M-754 , City of North York (Don River Watershed)
In accordance with the following documents and plans which shall form
part of the permit
(a) Landscape Plan Drawing #1, dated June 22, 1983, as prepared by
Harrington & Hoyle Ltd , Landscape Architects
(b) Section Plan showing Sections A-A and B-B, as prepared by
Harrington & Hoyle Limited
A( 4) City of Brampton
To alter watercourse south of Steeles Avenue, east of Heart Lake
Road (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit:
, Drawing Nos 1 and 15 Contract #83-137 dated July 1983 and
August 1983 respectively
-3- B-307
2 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property Town of Ajax
Cherry Road, The Regional Municipality of Durham
Res #240 Moved by J S Scott
Seconded by H C Lawrie
THAT the report (August 31, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
Re: Project: Land Acquisition Project 1982-1984 -
Waterfront Component Pickering/Ajax Sector
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property Cherry Road
Owner Town of Ajax
Area to be acquired 0 406 acres, more or less
Recommended purchase price Nominal consideration of $2 00, plus legal
and survey costs
"Included in the requirements for the above-noted project is an irregu1ar1y-
shaped parcel of land, being Cherry Road, established by Registered Plan 285,
Town of Ajax (The Regional Municipality of Durham)
"Negotiations have been conducted with officials of the Town of Ajax, and,
subject to the approval of your Committee, agreement has been reached with
respect to a purchase price, as follows
The purchase price is to be the nominal sum of $2 00, plus 1eqal
and survey costs, with date of completing the transaction to be
as soon as possible
"I recommend approval of this purchase, and that th~ legal firm of
Gardiner, Roberts be lnstructed to complete the purchase All reasonable
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-12-401 - Waterfront
Open Space "
3 WATER MANAGEMENT CLASS ENVIRONMENTAL ASSESSMENT
FOR THE CONSERVATION AUTHORITIES OF ONTARIO
Res #241 Moved by: Mrs L. Hancey
Seconded by E Fu1 ton
THAT the Association of Conservation Authorities of Ontario is hereby
authorized
(a) to submit an environmental assessment entitled "Water Management
Class Environmental Assessment - 1983 - The Conservation
Authorities of the Province of Ontario" to the Minister of the
Environment under the Environmental Assessment Act on behalf of
The Metropolitan Toronto & Region Conservation Authority, and on
behalf of any other Conservation Authorities authorizing the
Association of Conservation Authorities so to do and
(b) to act as agent of the Conservation Authorities of Ontario in
doing any act necessary to obtain an acceptance of the
environmental assessment and approval of the undertaking dealt
with in the environmental assessment under the Environmental
Assessment Act
B-308 -4-
4 AMO REPORT 83-5
Reform and Revision of Conservation Authorities in Ontario
Res #242 Moved by Mrs L Hancey
Seconded by H C Lawrie
THAT the report on the recommendations of the Association of Municipalities
of Ontario on Reform and Revision of Conservation Authorities in Ontario, as
amended, be received and forwarded to the Association of Conservation
Authorities of Ontario
CARRIED
5 QUOTATION #CLM83-34
-Indian Line Campground Superintendent's Residence Windows & Doors
The following quotations were received for the supply of windows and doors for
the Superintendent's residence at the Indian Line Campground
,
Supplier Price Quoted
Dashwood Industries Ltd S5,401 36
Lock-Wood Windows Ltd S5,445 18
Arnold Lumber Ltd S6,217 98
Robert Hunt Corp S7,200 03
Res #243 Moved by H C Lawrie
Seconded by S A Macpherson
THAT the quotation of Dashwood Industries Ltd for the supply of all required
double-glazed windows and doors for the Indian Line Campground
Superintendent's residence, in the sum of $5,401 36 (Provincial Sales Tax
included) be accepted it being the lowest quotation received
CARRIED
6 SOUTH THACKERAY SANITARY LANDFILL SITE
-Proposed Leasing of lands Downsview Radio Control Fliers
Motion Moved by L Martin
Seconded by S A Macpherson
THAT the application of the Downsview Radio Control Fliers for permission to
use the South Thackeray Sanitary Landfill Site as a flying field for radio-
controlled model aircraft be refused
THE MOTION WAS -------------------------------------------------- NOT CARRIED
Res #244 Moved by J S Scott
Seconded by M W H Biggar
THAT the staff be directed to pursue an agreement with the Downsview Radio
Control Fliers for their use of the South Thackeray Sanitary Landfill Site as
a flying field for radio-controlled model aircraft
THAT such agreement not exceed a one-year term, with the Authority reserving
the right of termination in the event af objection by local municipalities
AND FURTHER THAT no permanent structures be erected on the site
CARRIED
7 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
-Operating Expenditures
Res #245 Moved by E Fulton
Seconded by Ms S Nimmo
, THAT consideration of the report on the Black Creek Pioneer Village Visitor
Centre Operating Expenditures be deferred to the next regular meeting of the
Executive Committee scheduled to be held 5 October, 1983
CARRIED
-5- B-309
8 VACANT STAFF COMPLEMENT POSITION
-Water Resource Division
Res #246 Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT the vacant position Manager of Planning and Environment be advertised
and filled as soon as possible
CARRIED
9 DECISION OF HEARING
-Car1ro Holdings Limited
City of Mississauga
Etobicoke Creek Watershed
Res #247 Moved by E V. Ko1b
Seconded by Mrs L Hancey
THAT the application of Car1ro Holdings Limited, in accordance with Ontario
Regulation 170, for permission to place fill and construct a building and
driveway on Lot 10, Concession 4, E H S , City of Mississauga (Etobicoke
Creek watershed) be refused for the following reason
That the application, as submitted, will affect the
control of flooding
CARRIED UNANIMOUSLY
NEW BUSINESS
9 Res #247 Moved by L Martin
Seconded by E Fulton
THAT certain ~rsonne1 matters be dealt with in camera
CARRIED
10 Res #248 Moved by E Fulton
Seconded by Ms S Nimmo
THAT the Secretary-Treasurer in conjunction with the legal firm
Gardiner Roberts negotiate a separation settlement with Mr K G Higgs
ABSTAINED FROM VOTING - M W H BIGGAR
CARRIED
11 TERMINATION
On motion the meeting terminated at 11 50 a m , September 14 1983
Florence E Ge11 W E Jones
Chairman Secretary-Treasurer
KC
~ 8-310
,
the metropolitan toronto and region conservation authority
minutes REPORT #:16/83
EXECUTIVE COMMITTEE' 5-0CTOBER-1983 #16/83
The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview,
on Wednesday,S October, 1983.
PRESENT
Chairman Mrs. F.E. Ge11
Vice-Chairman E.V. Ko1b
Members W G. Barber
'M.W.H. Biggar
E. Fulton
Mrs. L. Hancey
H C. Lawrie
S A. Macpherson
Ms. S Nimmo
J.S Scott
Mrs. N. Stoner
Chairman, B Harper Bull Conservation
Fellowship Awards Committee Dr. T H Leith
B HARPER BULL CONSERVATION FELLOWSHIP AWARDS - 1983
Dr T H. Leith, Chairman, B. Harper Bull Conservation Fellowship Awards Committee,
introduced two of the recipients Michelle Gavine and Eddie Bevilacqua, emphasizing
the difficulty of selecting the winners from among the very high calibre of
participants The third recipient, Margaret Baker, could not be present. The
Chairman presented the awards and congratulated the recipients on their
achievements
EXPERIENCE '83 - PROGRAM #1601
-Final Report
Valerie Ashton, Co-ordinator, presented. her report
Res #249 Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT the report on Experience '83 - Program #1601, be received,
AND FURTHER THAT the following action be taken
(a) Valerie Ashton, Co-ordinator, Experience '83 - Proqram #1601, be thanked
for her excellent report,
(b) Copies of the report be forwarded, for information, to the Ontario
Youth Secretariat and the Minister of Natural Resources,
(c) The Authority thank the Province of Ontario for its sponsorship of the
Experience '83 program, and request the Province to give careful
consideration to the recommendations contained in the report in
planning for future Experience programs,
(d) The recommendations contained in the report be passed to the 1984
Experience Co-ordinator, if and when appointed
CARRIED
MINUTES
Res #250 Moved by Mrs N Stoner
Seconded by S A Macpherson
THAT the Minutes of Meeting #15/83 be approved
CARRIED
B-3J.1 -2-
DECLARATIONS
As a retired employee of Bell -Canada, MR W G BARBER declared a Conflict of
Interest regarding Items 6A(4) and GA(5) herein He did not participate in
discussion or vote on these items
SECTION I
FOR CONSIDERATION
1 PROJECT FOR UPDATING OF THE
GOODWOOD PUMPING STATION
Res #251 Moved by M W H Biggar
Seconded by Mrs N Stoner
THAT the staff report having regard to the Goodwood Pumping Station be
received
AND THE EXECUTIVE COMMITTE RECOMMENDS THAT the Project for Updating of the
Goodwood Pumping Station, Community of Goodwood, Township of Uxbridge
(The Regional Municipality of Durham), dated August 1983, as appended as
Schedule "A" of these Minutes, be adopted,
AND FURTHER THAT the following, action be taken
(a) The Regional Municipality of Durham be designated as the benefiting
municipality on the basis set forth in the project,
(b) The Government of Ontario be requested to approve the project and a
grant of 55% of the cost thereof,
(c) If required, the approval of the Ontario Municipal Board be requested
for the project, pursuant to Section 23 of the Conservation Authorities
Act,
(d) When approved, the appropriate Authority officials be authorized to
take whatever a~tion is required in connection with the project, .
including the execution of any documents,
(e) Upon completion of the project, the operations and maintenance
requirements of the Goodwood pumping system and associated drainage
works be transferred to the Township of Uxbridge..
CARRIED
2 REPORT #2/83
CONSERVATION LAND MANAGEMENT ADVISORY BOARD
Res #252 Moved by H C Lawrie
Seconded by W G Barber
THAT Report #2/83 of the Conservation Land Management Advisory Board be
received,
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #3, as set
forth herein, be approved
#3 THAT the fee schedule amendments to Ontario Regulation #139/80,
regulation made under the Conservation Authorities Act as appended as
Schedule "B" of these Minutes, become effective January 1, 1984
CARRIED
3 REPORT #2183
INFORMATION & EDUCATION ADVISORY BOARD
Res #253 Moved by Ms S Nimmo
Seconded by Mrs N Stoner
THAT Report #2/83 of the Information & Education Advisory Board be received
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #3, as set forth
herein be approved
#3 The amendments to Ontario Regulation 139/80 as Amended, Regulation
made under The Conservation Authorities Act as amended and appended as
Schedule lie" of these Minutes, become effective January 1st, 1984, and
September 1st, 1984
CARRIED
-3- B-312
4 REPORT #4/83
BUDGET & FINANCE SUB-COMMITTEE
Res #254 Moved by W G Barber
Seconded by E V Kolb
THAT Report #4/83 of the Budget & Finance Sub-Committee be received
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #2, as set forth
herein, be approved
#2 THAT the 1984 Pre1im4nary Budget as submitted by the Functional
Advisory Boards, and as amended and appended as Schedule "D" of these
Minutes, be received and approved,
AND FURTHER THAT subject to funding approvals yet to be received from
the Province of Ontario, the Prelxminary Budqet be reduced, as follows
PROJECT AMOUNT BUDGET PAGE #
Urban and Rural Drainage S 27,000 V-7
Erosion & Sediment Control 65 000 V-7
Prior4zation Studies 40,000 V-ll
C L M Sundry Development 15 ,575 VI-9
Cold Creek Rifle Range 15,750 VI-9
Ind4an L4ne Campground 120,000 VI-9
Heart Lake Washroom 80,000 VI-9
Upgrade maintenance 80,000 VI-ll
E S A Management 25,000 VI-16
Upstream Erosion 6,000 VI-18
Fish Management 5,000 VI-20
Wildlife Management 10,000 VI-20
Kortr4ght Development 100,000 VII-17
B C P V BU41d4nq Activities 201,500 VIII-7
790,825
.
in order to reduce the general levy increase over 1983 from 31 1% to
18 4%
AND FURTHER THAT application be made to Canada Works (Employment and
Imm4gration Canada) for the undertaking of the follow4ng projects
PROJECT AMOUNT
Urban and Rural Drainage $ 27 000
Pr4or4zation Structures 40 000
Sundry Development 15,575
Cold Creek Rifle Range 15,750
Heart Lake Washroom 80,000
Upgrade Maintenance 80,000
Upstream Erosion 6,000
Fish Management 5 000
Wildlife Management 10 000
Kortright Development 50,000
B C P V Building Activit4es 201,500
530,825
CARRIED
5 THE METROPOLITAN TORONTO & REGION CONSERVATION FOUNDATION
-Re-appo4ntment of Member
Res #255 Moved by W G Barber
. Seconded by H C Lawr4e
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr Eldon T Jackson be re-apP04nted
to The Metropolitan Toronto and Region Conservat4on Foundation for a further
three-year term from 25 November 1983 to November 25 1986
CARRIED
B-313 -4-
SECTION II
FOR INFORMATION
6 CORRESPONDENCE
Mr Ii A McLean Acting General Manager, reported receipt of the following
correspondence
(a) Further to information provided to the Committee at Meeting #15/83,
Mr McLean stated that by letter of September 21, the Minister advised
that a Flood Plain Criteria Review Committee had been appointed, and
urqed the Authority to make written and oral presentations Messrs
McLean and Mather of the staff, and Mr J Parkinson, legal
representative for the Authortty, attended a hearing on Monday of this
week and orally presented the comments and views of the M T R C.A ,
which, it is felt were, well received
The Borouqh of Scarborough presented a very good statement of its
, view of the Authority's management of the flood plains within
ScarQorough also, representatives of the Federation of Ontario
of Naturalists and Save the Rouqe Valley were qui~e complimentary
It is possible a subsequent meeting may be held in view of complaints
made on the above occasion of lack of sufficient notice of the first
hearing
(b) A letter from the ~hairman of The Association of Conservation
Authorities of Ontar~o to the Chairman of the M T R C A , advising that
th-e Association, wh~ch is presently accommodated in the Regional
Offices of the Ministry of Natural Resources in Richmond Hill, is
seeking a central location and requesting that this Authority consider
leasing office space for t,h~s purpose
Res #256 Moved by M Ii H Biggar
Seconded by Mrs L Hancey
THAT the Secretary-Treasurer be authorized to enter into neqotiations with
The Association of Conservation Authorities of Ontario for the rental of
suitable office space at the Black Creek Pioneer Village Visitor Centre when
such accommodation becomes available
CARRIED
(c) Letter from Central Req~on advis~ng that the Ministry's review of the
Authority's preliminary 1984 budget will take place on October 25 at
2 00 p m The Authority will be represented by the Chairman the
Chairman of the Budget & Finance Sub-Comm~ttee and appropriate staff
7 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #257 Moved by Mrs L Hancey
Seconded by Mrs N Stoner
THAT the applications listed herein as A(l) to A(16l inclusive be approved, .
subject to the conditions contained in the reports
CARRIED
A(l) Town of Richmond Hill
To construct pedestrian bridge in Richvale Greenway Park
across Little Don River
In accordance w~th the following documents and plans, which shall form
part of the permit
Job #83032 prepared by Mitchell, Pound & Braddock Ltd
and dated July 15 1983
B-314
-5-
A(2) Dr & Mrs Pape
To re-grade area for preparat~on of in-ground swimming pool
site #17 Denver Crescent City of North York
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan and cross section submitted with the application
A(3) The Regional Munic1pality of Peel
To construct watermain across Humber River, west of Highway #50,
north of King Street, Villaqe of Bolton, Town of Ca1edon
In accordance with the following documents and plans, which shall form
part of the permit
, Plan #5242-0 prepared by The Regional Munic~pality of Peel,
Department of Public Works, and dated November, 1982
A (4) Bell Canada
To install buried cable across small tributary of the Berczy
Creek, N1neteenth Avenue, west of Woodbine Avenue Town of
Markham. (Rouqe River Watershed)
In accordance with the following documents and plans, which shall. form
part of the permit
Plan RW #1 Order #959223, prepared by Bell Canada, and
dated September 12 1983
A(5) Bell Canada
To construct concrete-encased conduit crossing the West Branch
of the Don River at Dufferin Street, north of Stee1es Avenue,
Town of Vaughan
In accordance with the fo1low1ng documents and plans wh~ch shall form
part of the permit
Plan #401 as prepared by Bell Canada, and dated
August 17 1983
A (6) The Mun~cipa11ty of Metropol~tan Toronto
To construct 3-metre w1de pedestrian/bicycle/service vehicle path
from Steeles Avenue south ot Rowntree Mill Park City of Etobicoke
(Humber River Watershed)
In accordance with the followinq documents and plans, wh~ch shall form
part of the permit
A detailed topographic map showing the proposed walkway
alignment and dated September 1983
A(7) Paracon Brampton Inc
To construct storm sewer outfall to the Etob~coke Creek west
of Highway #10 north of Charolais Boulevard, City of Brampton
In accordance with the following documents and plans which shall form
part of the permit
Drawing #16 dated July 1983 Drawing #28 dated September 1983,
and Draw~ng U M 1 dated September 1981 all prepared by
Underwood McLellan Lim1 ted
B-315 -6-
11.(8) Brama1ea Limited
To construct storm sewer outfall to branch of the Etobicoke Creek,
south of Bovaird Drive, west of Dixie Road, City of Brampton
In accordance with the following documents and plans, wh~ch shall form
part of the permit
The Grading and Storm Outfall plans, prepared by
Johnson Sustronk Weinste~n & Associates Ltd and dated
August 25, 1983, and October 19, 1979, respectively
11.(9) Eileen & Michael Connor
To place fill at rear of #1 Lakehurst Crescent, City of Scarborough
(Waterfront)
In accordance with the following documents and plans which shall form
part of the permit
The report prepared and submitted by the owner with his
application, dated June 9, 1983 as revised June 16, 1983,
and additional revision dated August 12, 1983
11.(10 ) Beaupit, Martin, Kubik, Hansen, Ubanski -&- the City of Etobicoke
To repair retaining wall at #361 to #377 Lake Promenade
(Waterfront)
In accordance with the following documents and plans, which shall form
part of the perm~t
Sec~ion plans prepared by John Heck &"Sons Limi ted
11.(11) Baif Associates Limited
To construct storm sewer outfall and swale to the Don Ri ver south
of We1drick Road, west of Avenue Road, Town of Richmond Hill
In accordance w~th the following documents and plans, which shall form
.. part of the perm~t
Drawing #4, Project #10-83033 prepared by
Marshall, Macklin Monaghan Limited and dated
July 1983
11.(12') 370196 Ontario Limi ted
To enclose small tributary of the Etobicoke Creek in storm sewer
pipe, and ~e-construct storm outlet headwall south of Bovaird
Drive, east of Kennedy Road, City of Brampton
In accordance with the following documents and plans which shall form .
part of the permit
Sheets #1 3 4 17 and 19 as prepared by
Fred Schaeffer & Associates Limited and dated
March 1983
11.(13 ) Mrs Phyllis Hess
To place fill with~n regulated area #2137 Lakeshore Blvd West,
City of Etob~coke (Waterfront)
In accordance w~th the following documents and plans wh~ch shall form
part of the permit
A site plan and cross section subm~tted with the application
-7- 9-316
A(14) Moorville Properties Inc
To place fill within regulated area and alter a watercourse,
south of Vodden Street, east of Hiqhway #10 City of Brampton
(Etobicoke Creek Watershed)
In accordance with the following documents and plans which shall form
part of the permit
Drawings #11, 17 18, 19, and 25, Project #91-ES-605,
prepared by Fred Schaeffer & Associates Inc , and
dated May 1983
A( 15) Marview Construction Limited
To place fill in regulated area, east of Netherhart Road, north of
Britannia Road. City of Mississauqa (Etobicoke Creek Watershed)
In accordance with the following documents and plans which shall form
part of the permit
Draw~ng #1, prepared by Mark Engineering L~mited. and
dated September 1983
A(16) Norma Louise Alm
To construct two storm sewer outfalls to tributaries of the Rouqe
River, west of Bayview Avenue, north of Nineteenth Avenue, Town
of Richmond Hill
In accordance with the fo~lowing documents and plans which shall form
part of the perm~t
Drawing #1 to #4 Project #210-82 prepared by
G & L Engineering Ltd , and dated July 1983
8 PROJECTS FOR EROSION CONTROL & SLOPE STABILIZATION IN
THE MUNICIPALITY OF METROPOLITAN TORONTO, AND THE ~
REGIONAL MUNICIPALITIES OF PEEL YORK & DURHAM 1982-1984
-1984 Programs
Res #258 Moved by M W H Biggar
Seconded by Mrs N Stoner
THAT the Progress Reports and the Pools of Eros~on Priority Sites for 1984 be
received
AND FURTHER THAT the 1984 Work Programs and the Pools of Erosion Prior~ty
S~tes for The Municipality of Metropolitan Toronto, and The Regional
Municipalities of Peel York, and Durham, as appended as Schedule IIE" of
these Minutes be approved
CARRIED
Res #259 Moved by E V Kolb
Seconded by Mrs L Hancey
THAT the staff be directed to forward copies of the Projects to the affected
munic~palities for information, and advise them that the Authority will be
consider~ng these projects
CARRIED
9 HUMBER RIVER CHANNEL IMPROVEMENTS CONTRACT
PHASE II - FORMER VILLAGE OF BOLTON
-Extra Work Orders Nos 2 & 3
Res #260 Moved by M W H Biggar
Seconded by Mrs N Stoner
, THAT Extra Work Orders Nos 2 and 3 to the contract for the Humber River
Channel Improvements ~hase II - former Village of Bolton ~n the amounts of
$747 00 and $12 847 00 respect~vely be approved
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested
CARRIED
--
B-317 -8-
10 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property The Corporation of the Town of Vaughan
South side Highway #7. west of Kipling Avenue
Res #261 Moved by M W H Biggar
Seconded by Mrs N Stoner
THAT the report (September 21, 1983) set for~h herein received from the -
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
Re Project Land Acquisition Project 1982-1984 - Flood
Plain & Conservation Land Component Humber
River watershed
Authority Executive Resolution #88 Meeting #4 -
April 8, 1981 and Authority Resolution #38
Meeting #3 - May 15 1981
Subject property South s~de Highway #7
Owner The Corporat~on of the Town of Vauqhan
Area to be acquired 1 968 acres more or less
Recommended purchase price Nominal consideration of $2 00 plus 1eqa1
and survey costs
"Included in the requirements for the above-noted project is an irregular1y-
shaped parcel of land be~ng All of Block 27 Plan 65M-2163 Town of Vauqhan
(The Regional MunicipalJ.ty of York) located on the south side of Highway #7
west of Kipling Avenue
"Negotiations have been conducted with officials of The Corporation of the
Town of Vaughan and subject to the approval of your Committee aqreement has
been reached with respect to a purchase price, as follows
The purchase price ~s to be the nominal consideration of $2 00,
plus legal and survey Costs with date of completing the trans-
action to be as soon as poss~ble
"I recommend approval of this purchase and that the legal firm of
Gardiner Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land required free from encumbrance with the exception of an
existing service easement
"The Administrator of the Water Resource Division has reviewed this proposed
acqu~sition and is in concurrence w~th my recommendat~on
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"Funds are available for this acquisition - Account 0-04-11-401 - Flood Plain
Land Acquisition n
,
11 FORMER MINISTRY OF HOUSING PROPERTY GREEN RIVER PARK
TOWN OF PICKERING (DUFFIN CREEK WATERSHED)
Res #262 Moved by M W H Biggar
Seconded by Mrs N Stoner
THAT the Manager of Property & Administrative Serv~ces be directed to advise
Evdok~a Moumouris that the Author~ty-owned lands in the Town of Pickering
forming part of Green River Park will not be available to them for further
rental and that the park operation on Authority-owned lands must be
terminated on December 31 1983
CARRIED
.
-9- B-318
12 MINISTRY OF GOVERNMENT SERVICES
-Request for Authority-owned land for widening of Highway #50
Res #263 Moved by M W H Biggar
Seconded by Mrs N Stoner
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Ministry of Government Services to convey two
parcels of Authority-owned land required to facil~tate the widening of
Highway #50
AND WHEREAS it is the opinion of the Authority that it is in the best interest
of the Authority in furthering its objectives as set out in Section 20 of the
Conservation Authorities Act, to co-operate with the Ministry of Government
Services in this instance
THAT two parcels of Authority-owned land, containing a total of 9 11 acres
more or less be conveyed to the Ministry of Government Services to facilitate
the widening of Highway #50 north of Stee1es Avenue said lands beinq shown
as Parts 1 and 2 on Plan 43R-10599, and Parts 1 2 and 3 on Plan 43R-1060~,
and being Parts of Lots 1 and 2 Concession IX N D City of Brampton
(The Regional Municipality of Peel) Consideration to be the sum of
$205,000 00, plus legal, survey appra~sal landscaping and any other costs
involved in completing the transaction
THAT said conveyance be subject to an Order-in-Council being issued in ac-
cordance with Section 21(c) of The Conservation Apthorities Act R S 0 1980
Chapter 85 as amended
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever act~on may be required to give effect thereto
including the obta~ning of necessary approvals and the execution of any
documents
CARRIED
13 REPORT #2/83
WATERFRONT ADVISORY BOARD
.
Res #264 Moved by E Fulton
Seconded by H C Lawrie
THAT Report #2/83 of the Waterfront Advisory Board be received
AND FURTHER THAT the fol1ow~ng recommendation be approved
The 1984 Preliminary Budget Estimates as appended as Schedule "A" of
of the Minutes of Meeting #2/83 of the Waterfront Advisory Board held
9 September 1983 be included in the 1984 Preliminary Budget of the
Author~ty
CARRIED
14 1983 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM
-Extension
Res #265 Moved by W G Barber
Seconded by S A Macpherson
THAT the existing contract with Proctor & Redfern Limited be increased by
$4 500 00 to undertake additional sediment chemistry and benthic taxonomy
AND FURTHER THAT approval to the terms of reference be requested from the
Ministry of Natural Resources
CARRIED
15 1982 WATERFRONT ENVIRONMENTAL MONITORING PROGRAM
-Data Analyses
Res #266 Moved by W G Barber
Seconded by S A Macpherson
THAT IEC BEAK Consultants Limited be retained at a cost not to exceed
$7 500 00, to undertake an examination of sediment chemistry and benthic
lnvertebrate results in relation to water circulation and sediment
dlstribution patterns
B-319 -10-
AND FURTHER THAT approval of the terms of reference be requested from the
Min~stry of Natural Resources
CARRIED
16 AJAX WATERFRONT
Res #267 Moved by H C Lawrie
Seconded by W G Barber
THAT the firm of Proctor & Redfern Ltd be retained to complete a preliminary
engineering study for a sewage pumping facility to serve the Rotary Park
picnic area, Town of Ajax, at an estimated total cost of $3,250 00
CARRIED
17 REPORT #2/83
CONSERVATION LAND MANAGEMENT ADVISORY BOARD
t
Res #268 Moved by H C. Lawrie
Seconded by W G Barber
THAT Report #2/83 of the Conservation Land Management Advisory Board be
received, , ,
THAT Recommendat~on #2, as set forth herein, be approved
#2 THAT the 1984 Preliminary Budget, 'as append~ as Schedule "A" of
the Minutes of Meeting #2/83 of the Conserva io~ Land Management Adv~sory
Board, held 16 September 1983, be included in the 1984 Preliminary Budget
of the Authority
AND FURTHER THAT considerat~on of Recommendation #4, as set forth herein, be
deferred, for further information, to the next regular meeting of the
Executive Committee
,
#4 THAT the concept of environmentally significant areas be recognized
as a component of The Metropolitan Toronto and Region Conservat~on
Author~ty's implementation of its mandate
THAT the Watershed Plan, in particular the Land Acquisition Program and
the Conservat~on Land Management Program, be amended to incorporate the
ESAs currently ~dentif~ed and the concepts of ESA management,
THAT environmental reviews be undertaken for all proposed MTRCA works
which may impact ESAs and, where potential impacts are identified, the
means of mitigating these potential impacts be addressed, .
THAT individual management plans be prepared for ESAs on land owned and
managed by the MTRCA Other public agencies who manage MTRCA land or own
and manage their own land be requested to prepare individual ESA management
plans, with the assistance of the MTRCA or other appropriate agencies
THAT management guidelines be prepared by the MTRCA explaining the
significance of ecological systems (i e marsh, forests, etc ) , and
identifying the benefits/disbenefits of various actions,
THAT a strategy be prepared within the Community Relations Program to
inform and/or educate the general public and private landowners con-
cerning ESAs
THAT all master drainage planning undertaken by the MTRCA or in con-
junction with the mun~cipalities, other agencies, or developers
recognize and incorporate ESAs
THAT the MTRCA utilize ESA information as part of the data base for the
municipal plan review process,
THAT the regulatory powers of the MTRGA under Section 28 of the
Conservation Authorities Act, with respect to the placing or dumpinq of
fill be investigated as to their potential to include those ESAs not
currently regulated
-11- B-320
THAT the ESA data base be maintained and defined in conjunction with the
MTRCA's member municipalities, the Province of Ontario, affected agencies,
special interest groups, and others
AND FURTHER THAT copies of the Environmentally Significant Areas
Study (1982) be forwarded to the Author~ty's member mun~cipa1ities and
other appropriate government agencies and interest groups as a back-
ground resource document
CARRIED
Res #269 Moved by H C Lawrie
Seconded by Mrs L Hancey
THAT the preferred plan for the Master Plan of the Boyd Conservation Area
be received for information,
AND FURTHER THAT the staff be directed to finalize the p1ann~ng study,
taking into consideration public and advisory boards' comments, and circulate
the draft document to the affected municipalities for comments
CARRIED
18 QUOTATION #CLM83-31
-Claireville Conservation Area Saddle House Hydro
The following quotations were received for the supply of equipment, labour,
and material for the installation of a 100-amp hydro service at the
C1airevil1e Conservation Area Saddle House
SUPPLIER Amount
Jack Langen E1ec~ric Ltd $2,475 00
Sturdy Power Lines $2,986 00
Res #270 Moved by H C Lawrie #
Seconded by S A Macpherson
~
THAT the quotation of Jack Langen Electric Ltd for the supply of equipment,
labour and materials for the installation of a 100-amp hydro service at the
Clairev~lle Conservation Area Saddle House, in the sum of $2,475 00 plus
Provincial Sales Tax be accepted, it being the lowest quotation received
CARRIED
19 BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
-Operat~ng Expenditures
Res #271 Moved by M W H Siggar
Seconded by S A Macpherson
THAT the staff report and addendum on projected operating expenditures for
the Black Creek P~oneer Village V~sitor Centre be received
CARRIED
20 REPORT #2/83
HISTORICAL SITES ADVISORY BOARD
Res #272 Moved by M W H. Biggar
Seconded by E Fulton
THAT Report #2/83 of the Historical Sites Advisory Board be received
AND FURTHER THAT the following recommendat~on be approved
The 1984 Preliminary Budget, as appended as Schedule "A" of the Minutes
of Meeting #2/83 of the Historical Sites Advisory Board, held
15 September 1983, be ~ncluded in the 1984 Preliminary Budget of the
Authority
CARRIED
B-321 -12-
21 REPORT #2/83
INFORMATION & EDUCATION ADVISORY BOARD
Res #273 Moved by Ms S Nimmo
Seconded by Mrs N Stoner
THAT Report #2/83 of the Information & Education Advisory Board be received
AND FURTHER THAT Recommendations #1, #2, #4, and #5, as set forth herein, be
approved
#1 The Boyd Master Plan be approved in principle,
AND FURTHER THAT more detailed expressions of the components within the
Plan, such as the specifics of farm demonstration and camping areas, be
presented to relevant Advisory Boards for consideration before the Plan
is put before the Authority for approval ,
. #2 Consideration be given to ways and means of incorporating special
programs and promotions related to member municipalities' special
celebrations which are tied into the Province's bicentennial in 1984,
#4 The policy of family admission at the Conservation Areas, Black Creek
Pioneer Village and the Kortright Centre for Conservation, be reviewed
and defined, I
#5 The 1984 Preliminary Budget for the Informat~on and Education Division
as appended as Schedule "B" of the M~nutes of Meeting #2/83 of the
Information & Education Advisory Board, held 16 September, 1983, be
included in the 1984 Preliminary Budget of the Authority
CARRIED
22 REPORT #3/83
BUDGET & FINANCE SUB-COMMITTEE
Res #274 Moved by Mrs N Stoner
Seconded by W G Barber
THAT Report #3/83 of the Budget & Finance Sub-Committee be received,
THAT staff conduct a Program Perfor~ance Appraisal as soon as possible after
the 1983 Budget year,
AND FURTHER THAT such appra~sal be submitted to the Budget & Finance Sub-
Committee
CARRIED
23 REPORT #4/83
BUDGET & FINANCE SUB-COMMITTEE
Res #275 Moved by W G Barber
Seconded by E V Kolb
THAT Report #4/83 of the Budget & Finance Sub-Committee be received
THAT the revised Ministry of Natural Resources Audit of 1981 Expenditure
Reports be approved,
AND FURTHER THAT the Secretary-Treasurer be authorized and directed to
issue a cheque to the Treasurer of OQtar~o in the amount of $3,455 20
CARRIED
-13- B-322
24 FINANCIAL REPORT AND ACCOUNTS
-Months Ending July 31, 1983. & September 4, 1983
Res #276 Moved by Mrs N Stoner
Seconded by 5 A Macpherson
THAT the Divisional Expenditure Summaries for the periods July 1-31, 1983,
and August I-September 4, 1983, as appended as Schedule "F" of thse Minutes,
be received,
AND FURTHER THAT payment of the Authority accounts, in the amounts of
51,675,995 00 for the month of July, 1983, and 51,990,985 00 for the month of
August 1983, be approved
CARRIED
.
.
25 A~BION HIL~S CONSERVATION FIELD CENTRE
-Major Maintenance Roof Replacement
The following quotations were received for replacement of the roof at the
Albion Hills Conservation Field Centre
Firm Price Quoted'"
Provincial Industrial Roofing &
Sheet Metal Co ~td 533,450 00
Semple-Gooder Roofing $46,500 00
Dean Chandler Co ~td $49,800 00
"'Includes.Federal and Provincial Taxes
Res #277 Moved by Mrs N Stoner
Seconded by M W H Biqgar
THAT the proposal of Provincial Industr~al Roof~ng & Sheet Metal Co Ltd
dated September 19, 1983, for the replacement of the roof at the Albion Hills
Conservat~on Field Centre in the amount of $33,450 00 (including Federal and
Provincial Taxes) be accepted
CARRIED
26 NEW BUSINESS
The Act~ng General Manager tabled an item, entitled "Operating Statement -
Black Creek Pioneer Vlllage", for cons~deration at the next regular meeting of
the Executive Committee
Having regard to the 1984 Prelimlnary Budget, MS S NIMMO requested that, on
behalf of the Information & Education Advisory Board it be recorded that the
implementation of a major marketing program cannot be achleved within the small
amount budgeted (Page VII-11 refers)
27 TERMINATION
On motion, the meetlng termlnated at 11 30 a m October 5, 1983
,
florence E. Gell W E Jones
Chalrman Secretary-Treasurer
B-323
SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
.
PROJECT
FOR
UPDATING OF GOODWOOD PUMPING STATION
COMMUNITY OF GOODWOOD
TOWNSHIP OF UXBRIDGE
THE REGIONAL MUNICIPALITY OF DURHAM
,
AUGUST, 1983 .
B-324
CONTENTS OF BRIEF
I ?UR?OSE
II LOCATION AND DESCRI?TION
III HISTORY OF FLOODING
IV COSTS AND FINANCING
V A??ROVALS
, ,
.
,
,
,
B-325
I PURPOSE
The purpose of this project is to permit The Metropolitan Toronto and
Region Conservation Authority to exercise the powers afforded by The
Conservation Authorities Act R S 0 1970, Chap 78, as amended to
establish and undertake in the area over which it has jurisdiction,
a program designed to further the conservation, restoration, development
and management of natural resources in accordance with the Flood Control
Program of the Watershed Plan
The purpose of this project is to meet one of the defined objectives
of the Flood Control Program which is
to maintain flood control structures as required in order
that they can continue to perform as designed.
Through this project, The Metropolitan Toronto and Region Conservation
Authority will replace the twenty-five year old flood control pumping
facility within the community of Goodwood in the Township of Uxbridge
The completion of the improved pumping facility will enable the
Authority to continue to provide the existing level of flood protection
provided to the community since the station was constructed by the
Authority in 1958
,
.
B-326
II LOCATION AND DESCRIPTION
The community of Goodwood is located in the Township of Uxbridge on
Highway 047 between the Village of Stouffville and the Town of Uxbridge
The community was developed within an area of irregular terrain and
is situated in a depression or bowl from which no natural overland
drainage outlet exists (see attached location map) As a result of the
community's location, flooding has been a problem since its inception
(see attached section on History of Flooding)
The flooding problems associated with Goodwood were identified in the
1956 R D H.P Conservation Report prepared by the Department of Planning
and Development, and as a consequence of this report, a study of the
flooding situation was undertaken by W 0 Chisholm, Consulting
Engineers The study completed in June of 1957 for The Metropolitan
7oronto and Region Conservation Authority recommended that a pumping
facility and internal drainage network be constructed to alleviate t!1e
flooding problem The works recommended within the above report were
constructed in 1958 at an estimated cost of $37,000 and consisted of a
, pumping station and collection system which receives the local surface
drainage. The flood waters drained to the pumping station from within
th~ community are pumped southerly over the height of land to 'a small
watercourse draining to the Duffin Creek
The existing flood control system has now been operating for over
twenty-five years and for the most part has protected the community from
any significant flood damage During the lengthy operation period of
the system, a number of probl~~s have hindered the efficient vperation
of the station Perhaps the most common has been the free~ing of the
intake structure, this is due to the cesign of the intake and that the
intake is not located within t!1e building which would facilitate
heating Along with the above mentioned problems, the age of the
facility has become a concern, with replacement components becoming
unavailable and increasing maintenance costs being required to maintain
operation Also since the pump must b~ started manually, the Author it y
~ust hire an operator to ensure the operation of the pumping facility
when requi:-ed
I\s a result of the problems arising with the system, the age of the
pumping facility and the expeoted increases in maintenance and
operational costs, a study wa~ commissioned by the AuthQrity to
investigate the present facility The study was also to determine what
changes were required to update the system in order to maintain the
level of flood protection presently being provided to the community of
Goodwood The study entitled 'Modifications to Goodwood Pumping
Station' was completed in December of 1982 by Chisholm, Fleming and
Associates and outlined several schemes to incorporate an updated flood
control system for the community After reviewing the alternatives
described within the report, the Authority is proposing to undertake the
construction of the alternative requiring a complete reconstruction of
the pumping faCility
The works being proposed include the demoli~ion of the existing
pumphous~ and the construction of an underground chamber to house two
new submersible pumps slong with the piping of the intake ditch This
new structure will facilitate the heating of the intake assembly to
negate the effects of ice and ensure the efficient operation of the
pumping system Also proposed is the conversion of the existing diesel
engine to provide standby power in order to maintain operation in the
event of a power failure to the pumping system Electrical
modifications are also proposed to completely automate the pumping
facili ty Automation of the system will improve the effective use of the
pumps as well as remove the need for an operator, thus reducing the
operational costs
.
8-327
As mentioned, the proposed works will result in several benefits, i e
the level of flood protection previously provided by the Authority to
the community of Goodwood will be maintained, a reduction in operational
expenses will occur due to the automation of the system and the
anticipated increase in maintenance costs required to continue operation
of the existing system will be greatly reduced Since the expected life
of the existing system has been reached, as it will for all such
facilities, it is therefore essential that the system be updated
The Township of Uxbridge and Authority staff have had discussions
regarding the Goodwood pumping station in terms of operation and
maintenance Staff have indicated to the Township of Uxbridge a desire
to see the operations and maintenance aspects of the facility become the
responsibility of the Township upon completion of an updating of the
existing facility. The operation of this facility by the Township of
Uxbridge will result in an additional benefit to this Authority by
negating any maintenance costs over the life of the updated pumping
station. The overall implications of having the pumping facility under
the jurisdiction of the Township would be a reduction in the Authority's
operations and maintenance costs and having the operational
responsibilities of the Goodwood pumping station in a more logical and
appropriate place
,
.
-..-..
.1"' ..,.
,,~__"I:....-
....... ......-.. -----
- .. - - ....... ---
--... --
....- - -----
'"
,.................UO'...-4I. .................
~........d"""'.. o..I"--.f ....~/_o(
,..... c..,....... u.
lJl
,.... _..... .._..~.!>'~ _... I
...... .......__ _.. ___ W
IV
(J)
lJETROPa.ITAN TORONTO AND REGlCll
CONSERVATION AUTI.:J/lITY
=.-.0010 fa~'L"
329
III HISTORY OF FLOODING
Since the inception of the community of Goodwood in the mid-eighteen
hundreds, flooding has been a persistent and severe problem The nature
of the site allows for no direct outlet for drainage and as a result,
surface ponding of flood waters created an annual flooding problem
While some flooding of the area was reported during the Hazel storm,
the vast majority of flooding problems within the community were
restricted to the spring melt period During the melt periods, flooding
averaged more than a foot in depth resulting in flooded basements and
first floor levels of homes Since no natural outlet was available
to drain the flood waters, flooding of the area was reported to last
six to ten weeks before the area was completely dry. On several
occasions, flooding of septic tanks and wells occurred resulting in
potential health problems
The area draining to the community is approximately 380 acrs whih
produces approximately 80 acre-ft of water during the spring freshet
The area of flooding has been deliniated at 45 5 acres resulting in
23 stru9tures being inundated prior to the flood control works being
constructed Since the operation of the pumping facility first began
in 1958, only minor flood~ng situations have been recorded, mostly due
to ice within the drainage network
~
.
.
5-330
IV COSTS AND FINANCING
The expenditures required to implement this project shall be understood
to include engineering and geotechnical studies, site supervision,
environmental assessment and all materials, labour, equipment, etc
associated with the construction
~
Activity
Mobilization/Demobilization ~2,000 00
Site Preparation/Restoration $6,000 CO
Construction of underground concrete chamber $35,000.00
Purchase and installation of 2 FYGT 88 HP $51 ,000 00
submersible pumps and motors
Piping and connection to existing forcemain $25,000 no
Installation of new electrical services $6,000 00
Electrical distribution, lighting and heating .t3,OOO 00
Automation of controls $2,000 00
Conv~rsion of existing ~iesel Sngine $9,000 00
Engineering, leg al , inflation and contingency $36,000 00
allowance
PROJECT TOTAL - $175,000 00
Financing
!his project will be funded as follows
Province of Ontario - $96,250 00
Authority - ~78 ,750 00
The Regional Municipality of Durham be designated as the benefiting
municipality to raise the Authority's share of the costs of the
works, being 45% of the total
, ,
B-331
V APPROVALS
.
8-332
SCHEDULE "Bit
ONT~O REGULATION 139/80
A.s Amended
REGULATION MADE ONDER
THE CONSERVATION AUTHORITIES ACT
CONSERVATION AREAS
METROPOLIT1\N TORONTO 1\ND REGION
SCHEDULE
1 In this Schedule "season" means the summer season that commences on the 1st day
of April and ends on the 31st day of October in any year or the winter season
that commences on the 1st day of November and ends on the 31st day of March of
the next following year.
2 The following fees shall be paid to the Authority for permits issued by the
Authority and for the occupation and use of the lands and works, vehicles,
boats, recreational facilities and services of the Authority:
Proposed
1983 1984
(l) For parking in all conservation areas except Black Creek,
Pa1grave, Woodbridge, Claremont, and Humber Trails,
{ a) for one vehicle carrjing less than
ten passengers,
( i) weekends and holidays,
per day . . . $ 3.00 $ 3 so
(ii) weekdays, excluding holidays,
per day . 2 00 2 25
(b) for an annual parking permit for
one vehicle carrying less than
ten passengers, per yea~ . 30 00 35 00
(c) for one vehicle carrying ten or
more passengers, per day . 20 00 20 00
(2) For a permit at Glen Haffy Extension,
(a) for the use of each fishing pond,
including vehicle parking for not
more than twenty vehicles, per
day . . . 84 00 100 00
(b) for parking, for each vehicle in
addition to the twenty vehicles for
which a fee is paid under clause (a) ,
(i) weekends and holidays, per day . . . " 3 00 3.50
(ii) weekdays, excluding holidays, per day . . . 2 00 2 25
(c) for the use of row boats, including
life jackets and oars, when used
in conjunction with a permit issued under
clause (a) plus Provincial Retail Sales Tax
per pond, per day . 2l 00 25 00
(d) for the use of the cabin, when used
in conjunction with a permit issued under
clause (a) , per day . 26 00 30 00
B-333 - 2 -
Proposed
1983 1984
4 For the use of the Heart Lake Recreation Building,
the Albion Hills Chalet or the Bruce's Mill Beach
Centre, with a minimum fee of $30.00 plus parking
fees, per hour . . . . . . 15.00 15 00
5. (1) For the use of the Cold Creek Conservation
Field Centre meeting room with a minimum rental
fee of $30 00 plus parking fees, per hour. . 15 00 15 00
(2) For the use of kitchen facilities in conjunction
with the use of the meeting room for which a fee
is paid under sub-item 1, per hour.. . . ... . . . . . 7 SO 7.50
6. (1) For the rental of a row-boat including life
jackets and oars, in a conservation area
except Glen Haffy Extension, plus Provincial
Retail Sales Tax, per hour . . . . . . . . . 3 15 3 25
(2) For the rental of a canoe, including life
jackets and paddles, plus Provincial Retail
Sales Tax,
I
(a) per hour. . ... . ... . . . . . . $ 3.65 $ 3 75
.
(b) per day . . . . ... . . . .. . . . 15 75 16 SO
ill per day, for a group with a reservation,
per canoe w~th a ~nimum of 5 canoes - 10 00
(3 ) For canoeing instructions for a group of at
least five people, with a reservation, including
the use of a canoe, life jackets and paddles,
per group member
(a) per half-day . . . 4 20 4 SO
(b) per day . . . . . . . . . . . . . . 7 35 7 75
(4) For canoeing instruction courses for individuals
including the use of a canoe, life jackets and
paddles, per course, per person. 42 00 45 00
(5) For group canoeing instruction, other than a
group with a reservation, for a one hour lesson,
per person.. . . 2 90 3 00
8 For a permit authorizing a corn roast or similar
activity after sunset, not including parking,
in any conservation area except Black Creek 25 00
8
,
. . . . . . . . . 35 00
9 (1 ) For a permit to occupy a specially
designated group overnight camp-site,
including parking for up to seven nights,
(a) for a group of no more than twenty
persons, per night. . .. . .. . . . .. . .. . , 11 00 20.00
(b) for each person, in addition to the
twenty persons for whom a fee is
paid under clause (a), per night . . 55 60
.
(2) For a permit to occupy a group day camp-site
including parking, per person, per day 55 60
- 3 - B-334
Proposed
1983 1984
10 For a permit to occupy an individual unserviced campsite,
(a) at Albion Hills and Cold Creek
Conservation Area, per night . . 7 00 8 00
(b) at the Indian Line Tourist
Campground, per night. . . . . . . . 8.00 9 00
( c) at Albion Hills Conservation Area, per season. . . . . 336 00 375.00
11 For electric power and/or water hookups at an
individual camp-site, where available, per night. . . 2 00
11
. . . . . . . . . . . . . . . . . . . . . . 11 00
12 For firewood at a conservation area named in
paragraph 10, per bundle . . . . . . ... . . . . 1 00 l.00
13 For showers at Albion Hills and Indian Line
Tourist Campground, for a controlled time period . 25 25
14 For launching a boat, not including vehi~le
parking, per day... . . . . . .. . . . . . .... . . . . $ l.00 $ 1 00
15 For a permit for use of a conservation area for
horseback riding, not including vehicle parking,
(al per day, per horse . . . 1 00 1.00
(b) per year, per horse. . . . 20 00 20 00
16 For a permit for the operation of an all
terrain yehicle, not including vehicle parking,
per day . . . 1 00 1 00
18 For use of the Petticoat Creek swimming area,
(al per person, per day . . . . . . 55 60
(b) for a book of ten tickets 4.50 5 00
21 For commercial photography or filming in any conservation
area, except that part of the Black Creek Conservatin
Area known as Black Creek Pioneer Village,
(a) for the use of the grounds and environs,
excluding staff and equipment,
per hour . 25 00 $ 35 00
( b) for participation by staff of the Authority,
(i) during the usual working hours
of the staff member, per person,
per hour . . . . . . $ 15 00 ~ 15 75
(ii) qfter the usual working hours
of the staff member, per person,
per hour . . . . . . . . 22 00 24 00
(cl for use of Authority vehicles or
tractors, including Authority staff
to operate such vehicles or tractors,
(i) during the usual working hours
of the staff member, per vehicle,
per hour . . . 30.00 31 SO
(ii) after the usual working hours
of the staff member, per vehicle,
per hour 35 00 38 00
B-335 - 4 -
Proposed
1983 1984
24 For the use of a rifle range at the Cold Creek
Conservation Area,
(a) for a daily permit, per person . . . . $ 2 00 $ 3 00
(b) for a group permit, not including
weekends or holidays, per season . . .. . . . SO 00 60 00
(c) for a special event permit.. . . . . .. . 10 . 00 15 00
25 For the use of an archery range at the Cold
Creek Conservation Area,
( a) for a daily permit, per person . .. . . . . . . . . . . . . . . 1.00 1.25
(b) for a season group p~rmit, not
including weekends or holidays.. 50.00 60 00
(c) for a special event permit... 10 00 15 00
26. For a special event permit for the use of the
trap range at the Cold Creek Conservation Area,
per event . . . . . . . . . . . . . . . . 10 00 15 00
27 For the use of an electric trap at the
Cold Creek Conservation Area,
(a) per day, per person . . . . . . . . 2 00
(a) per round of 25 birds . . . . . . 3 00
(b) a group permit, per sea,son . 100 00 125 00
# .
28 For the use of a manual trap at the Cold Creek
Conservation Area for use by up to five persons,
(a) on weekends and holidays in
the summer season, maximum of
one hour 4 00 4 50
(b) on weekdays, other than holidays, in the summer
season and on any day during the winter season . 4 00 4 SO
29 For dog trials, at the Cold Creek Conservation Area,
(a) for a group permit, per season SO 00 60 00
(b) for a special event permit. ~ . . . 10 00 15 00
31 Subject to paragraphs 33 and 34, for the rental
of ski equipment, when available, consisting
of skis, boots and poles,
(a) for cross-country skiing,
(i) for individuals fifteen years
of age or over, plus Provincial
Retail Sales Tax, per day
1 up to and including 1 00 P m. 7 35 8.00
2. after 1:00 pm... . 5 25 6 00
(ii) for individuals under fifteen
years of age, plus Provincial
Retail Sales Tax, per day
1 up to and including 1:00 p.m $ 5 25 $ 6.00
2 after 1 00 P m. . 3 65 5 00
- 5 - 8-336
Proposed
1983 1984
32 For the rental of snowshoes, when available,
plus Provincial Retail Sales Tax, per day,
(a) for individuals fifteen years of
age or over.. ....... . . 3.00 3.00
(b) for individuals under
fifteen years of age ... .... . . 2.00 2.00
(c) for each individual in a group,
wi th a reservation. ..... .. .. . 2 00 2 00
(d) for each individual in a group
including planned activity. ... 5 00 5 00
33 For each individual in a group, with a
reservation, for cross-country skiing instruction,
including the use of cross-country ski equipment
and ski trails, per day .. .. 6 30 6 SO
34 (1) For the use of cross-counry ski trails
at Albion Hills, Bruce's Mill, and Cold Creek, for
an individual equipped with cross-country
ski equipment, not including vehicle parking,
per day,
(a) for each person fi=t~en years of
age or over 1 00 2 00
(b) for each person under fifteen
years of age. . SO 50
35 ~or entrance to the Claremont (to be deleted)
and Pa1grave Forest and Wildlife Areas during
the winter season, per day,
(a) for each person fifteen years
of age 0:' over 1 00 2 00
(b) for each person under fifteen
years of age 50 50
36 For group cross-country skiing instruction,
other than a group with a reservation,
not including parking, for a 1 1/2 hour
lesson, per person. 3 65 4- 00
37 For individual one hour lessons for
cross-country skiing, when available,
per person 7 35 a 00
38 For firewood, including delivery within a radius
of thirty-~~o kilometers of the source of
sllch firewood, per cubic meter 45 00 45 00
B-337
SCHEDULE I'ell
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
FEE SCHEDULE
EFFECTIVE JANUARY 1ST, 1984
AND SEPTEMBER 1ST, 1984
TO
ONTARIO REGULATION 139/80, A.S AMENDED
REGULATION MADE UNDER
THE CONSERVATION A.UTHORITIES ACT
PROPOSED PROPOSED
PRESENT FEE FEE AS OF FEE AS OF
JANUARY 1/84 SEPTEMBER 1/84
Schedule - Section 22
For school visitations at
Black Creek Pioneer Village
(al Tours, per student 2 25 2 25 2 SO
Unguided Tours 1 75 1. 75 1. 75
(bl Christmas Tour 3 00 3.25 3 25
(cl Pioneer Life Program 4 2.5 4 25 4.25
I
Schedule - Section 23
For entrance to the Kortright
Centre for Conservation
(al General Public Adults 2.00 2 00 2 00
Students 1 00 1. 00 1. 00
(bl Students Regular Program 1 SO 1. SO 1 75
Christmas Program 2 SO 2.50 2.50
(cl Family Admission Rate 5 00 5 00 5.00
(dl Annual Individual Membership 15.00 20 00 20 00
(e) Annual Family Membership 25 00 30 00 30.00
Schedule - Section 30
For guided tour at Bruce's 1 00
Mill Maple Syrup Program o 80 1 00
Schedule - Section 40
Fer use of the Cold Creek
Conservation Field Centre
(al Students 6 00 6 00 7 00
(bl Camping - Site A 3 00 3 00 3 00
- Site B 2 00 2 00 2 00
(c) Skiing/Snowshoeing 2 SO 2.50
Schedule - Section 41
For the Alb~on Hills C A.
Farm Program
(al Farm Tour - Regular 1 00 1 00 1 00
- Senior 2 50 2 50
Residential Conservation Education Field Centres, program, per day
(al Albion Hills C.F C. 712 00 748 00 748 00
(bl Claremont C F C 712 00 748 00 748 00
(cl Boyd Cons F C. 550 00* 578 00* 578 00
Cdl Lake St George C F C. 550.00* 578.00* 578 00
* The fee for Boyd and Lake St. George Conservation Field Centres is based on a
5% increase over 1983 and is subject to the approval of the Joint Planning
Commi ttee This fee does not include the cost of teaching staff
.
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
1984 PRELIMINARY BUDGET .
Authori ty
October 14, 1983
en
0
Eli
t:I
C
t"'
t>3 lJj
I
w
t:I w
= (Xl
1'.!I.!l_!1_E1'~2.!'2.!- I T.!\~_ TO~2NT02~-P__R.!l.912~_SONS.!l~.Y]\Y12~_!<~],.!I2~ I TY
lJ 8 4-1'~.!l.!-1!11 N~~_.!l~-PGE.!.
I N D E X
-------
P a.9_~J~l_ !'~.9~Jlll.
BUDGET REPORT & PROVINCIAL FUNDING 1-1-8 - !>'p~ration & !1ain..!=~~.!l~~/Dam.!.L. Cha.!lnelSi~rosiol'!
CO.!l_t..E.?J._E..!=_!'.~~..!=~~ - Program Descr pt'lOn V-8
MUNICIPAL LEVIES AND BASIS OF APPORTIONMENT 11-1-3 - program Budget Summary V-9
- Erosion Control - Program Description V-lO
BUDGET SUMMARY 111-1-4 --- ----------- - Program Budget Summary V-11
- Flood Control Plannil'!9. & Remedial Measures
THE FINANCE & ADMINISTRATION DIVISION --------------------- --~prog~aRlDescriptlon V-12
-~-~V1-S1on Descrlption-~Goal~Responsibilities IV-l - Program Budget Summary V-13
- 1983 Achievements - 1984 priorities IV-2
- Division Budget Summary IV-3 Waterfront - program Budget Summary V-14
- Administration - program Description IV-4 ---- P r .?.9..E~E'_!<~E'J._nJ_s..!=..E~_tJ. 0 n
--------- - program Budget Summary IV-5 - Program Description V-IS
- gen~..E~J._.!l~.p~.!l~~ - Program Description IV-6 - Program Budget Summary V-16
- Program Budget Summary IV-7 - !-~.!t~_2.!l..!=~..EJ..?_!l_a..t~E~ r o.!l t De v e 12P.me n t
- pr.?.P~..E..!=L_!<~~~J...!=J..?.!lJ Ma i n..!=!:.!'~ffil:{-~.9~E'~.!l~ - Program Description V-17
- program Descr p on IV-8 - program Budget Summary V-18
- Program Budget Summary IV-9
......
THE CONSERVATION LAND MANAGEMENT DIVISION
-~vlS1o-nDescrl(>tllcln~-Goa~Responsibilities VI-l
- 1983 Achievements - 1984 priorities VI-2
THE WATER RESOURCE DIVISION - Division Budget Summary VI-3
-~-DlvlS101rlDescr1Pl1on ~oals & Responsibilities V-I - pr.?.9..E~E'_~~E'JEJ.~_~~..!=J..?~ - Program Description VI-4
- 1983 Achievements - 1984 Priorities V-2 - program Budget Sum~ary VI-5
- Division Budget Summary V-3 - Watershed Recreation
- !'~.?.9..E~~~dmJ..!IJ..,.;;~_a..!=J..?~ ---pranriTi-ig------ - Program Description VI-6
- Program Description V-4 - Program Budget Summary VI-7
- Program Budget Summary V-5 Development - Program Description VI-8
- Conservation Services - program Budget Summary Vl-9
----------------~1'rogram Description V-6 Operations & Maintenance
- Program Budget Summary V-7 - Program Description VI-IO
- Program Budget Summary VI -11
nevenue Breakdown VI-12
.
..
- 2 -
!'1'~ (s) P a..9~J,;;l_
TH~_S.9NS~~.YM:1.9.!L!-ANDMl'NAGE!,EN1' D 1 .Yl~1.91L~..?.!l td-.:.
- Conservation Land Ma~ement
- Conservation PlannTng ---- - commu~~ Relations -,Conservation Education
- Program Description VI -13 -Superv slOn;ope-rcin:ons 5r Maintenance ---
- Program Budget Summary VI -14 - program Description VII -1 2
Tree Planting/Forest Management - Program Budget Summary VII-13
- Program Description VI-IS Kortright - Program Description VII-14
- Program Budget Summary VI-16 - progtam Budget Summary VII-iS
Soil ErosionlSediment Control Development - Program Description VII-16
- Program Description VI-17 - Program Budget Summary VII-17
- Rrogram Budget Summary VI-18
Fish/Wildlife Management
- Program Description VI-19 THE HISTORICAL SITES DIVISION
- Program Budget Summary VI-20 ---1>lVlSTc;il Deacrli:jrIon -- Goals & Responsibi Ii t iea VlI1-1
- 1983 Achievements - 1984 priorities VIII-2
- Division Budget Summary VII1-3
- !'~..?..9~1'~_~~~nis_~1'~~~ - program Description VII 1-4
- Program Budget Summary VIII-5
- ~1-eration & Maintenance - Black Creek
~_..?_~~_~11a..9_~------ - ~rogram Description VIII-6
TilE INFORMATION & EDUCATION DIVISION - Program Budget Summary VI 11-7
-~-1>lV1~C>>\1>e!scriptlon - Goals & Responsibilities VI1-l - !l2~~1'J:j..?.!l_.!'~..?..9. r am - Program Description VII 1-8
- 1983 Achievements - 1984 priorities VII-2 - Program Budget Summary VIII-9
- Division Budget Summary VII-3 - -~~..Lt1'D~Y~ 1 oJl~~.!l_t: - program Description VIII-10
- pr..?..9~1'~22.!!!.!.!lE_~1'J: i on - Program Budget Summary Vlll-ll
- Program Description VII-4 - Visitors Centre - Program Description VIII-12
- Program Budget Summary VII-5 ---------------- - Program Budget Summary VI 11-13
- Communit~ Relations - Information
-Geileral ---- - Program 1>escrIption VII-6 VEHICLE AND EQUIPMENT FUNDS
- Program Budget Summary VII-7 ---=-Pi-og r"2iiiloescr i pt'lo-n--- IX-I
Resources Management Programs - 1984 Objectives IX-2
- Program Description VII-8 - Program Budget Summary IX-3
- Program Budget Summary VII-9
Planning/Marketing Analysis VII-I'O
- Program Description FOOD SERVICE
- Program Budget Summary VII-ll :.-p-rogr-aiilDesc rip t ion X-I
- 1984 Objectives X-2
- Program Budget Summary X-3
.
Page 1-1
.
1984 BUDGET
Authority Purpose, Achievements and Objectives
The Metropolitan Toronto and Region Conservation Authority adopt~d a comprehensive Watershed Plan on December 5, 1980, to
establish long-range goals in nine program areas specific to the 3467 square kilometres within Authority jurisdiction The
adoption of the Plan is in compliance with the direction of the Conservation Authorities Act to undertake a program designed
to further the conservation, restoration, development and management of natural resources and of the Province of Ontario to
study and investigate the watershed and prepare and file wi th its member municipalities and the Minister of Natural Resources,
a Watershed Plan.
The Watershed Plan has been filed with, and concurred in by, the Authority's member municipalites and the Director, Central
Region, Ministry of Natural Resources The Authority, in the Plan, has identified the river valleys, the Lake Ontario
shoreline and the headwaters of the Oak Ridges inter lobate moraine and the Niagara Escarpment as the major resources to which
its programs are applied.
The Watershed Plan is comprised of nine (9) interrelated program~~
The basic requirement of the Authority is to provide protection to human life and property from the hazards of flooding and
erosion The Flood Control Program and three complementary programs, Erosion and Sediment Control, Storm Water Management and
Conservation Land Management, establish the means to accomplish this objective and recognize the relationships between rural
and urban drainage, erosion and sedimentation, and flood i ng
Flood Control Program - Provides for remedial measures, land acquisition and the administration of regulatory measures to
maintain flood plains unobstructed to ensure the passage of flood fl ows .
Erosion and Sediment Control Program - Provides for corrective works and the administration of regulatory measures to protect
life and property.
Storm Water Management Program - Establishes a basis for co-operative action by the Authority and its member municipalities
with respect to water management problems and the preparation of master drainage plans.
Conservation Land Management Program - Promotes conservation on private and public lands by providing reforestation, habitat
improvement, stream improvement and a conservation planning service.
Land Acquisition Program - Provides for the acquisition of flood plain and valley lands, waterfront lands and environmentally
significant lands to ensure proper conservation land management. The hectares of land acquired by the Authority are
being managed to achieve the objectives of the Watershed Plan
Lake Ontario Waterfront Development Program - This program has two components, Shoreline Management to reduce the hazards of
flOOding and erosion at the land/lake interface, and Development to create water-oriented recreation opportunities
19B3 09~19
Page 1-2
Watershed Recreation Program - Enables the development and operations of recreation areas for public use and enjoyment, a
valuable ancillary benefit on conservation lands
Heritage Conservation Program - Recognizes the special contribution that a~ historical perspective gives to the understanding
of r~source management.
Community Relations Program - Establishes the means by which the Authority can communicate with the community in order to gain
understanding and acceptance of its conservation programs.
The 1984 Budget Estimates derive from the Watershed Plan reflectiog a strong orientation to Water and Related Land Management
Programs and emphasizing planning, regulatory and environmentally acceptable solutions to water management problems. The
Budget proposals also address a number of administrative matters
- disposition of municipal levies on hand
- provision for gapping, set at 1% of full-time wages, salaries and benefits
- identification and allocation of interest income
The adoption of this Budget will not enable the Author i ty to maintain the level of service provided to the community in 1983
and will not enable the Watershed Plan objectives to be implemented at the rate anticipated on adoption.
Format of Presentation
The 1984 Budget Estimates are based on the same program management format as the 1983 budget forma t. The format is designed
to identify more clearly the programs adopted by the Authori ty in its Watershed Plan. In addition, the budget estimates are
organized into management units to more clearly iden~ify and manage the Authority programs. The principles of program budget
management have been used to develop the Budget.
There are five major types of provincial grants available through the Ministry of Natural Resources to Conservation
Authori ties
1 Administration .
2. Water and Related Land Management
3 Conservation and Recreation Land Management
4 Speci a 1 Projects and Programs
5 Supplementary Grants (not applicable to MTRCA)
Commencing in the 1983 budget year, the Ministry of Natural Resources recommends the payment of grants to authorities based on
a priority ranking system, using technical criteria, which compares the 'need' for individual projects in a province-wide
matrix
.
1983 09.19
Page 1-3
Authority Programs
1 Finance and Administration
(a) Program Administration
(b) General Expense
(c) Property Acquisition, Maintenance and Management
2. Water Resource
(a) Program Administration
(b) Conservation Services
(c) Erosion and Sediment Control (including Lake Ontario's Shoreline Management Program)
(d) Flood Control - Planning and Remedial Measures
- River Forecasting Operations
- Maintenance - Small Dams, Channels and Erosion Control Sites
(e) Program Administration - Waterfront
( f) Waterfront Development
..
3 Conservation Land Management
(a) Program Administration
(b) Watershed Recreation - Planning
- Conservation Area Development
- Operations and Maintenance
(c) Conservation Land Management - Planning
- Tree Planting/Forest Management
- Soil Erosion and Sediment Control
- Fish and Wildlife Management .
.
1983 09 19
Page 1-4
5. Information and Education
(a) Program Administration
(b) Community Relations - Information - General
- Resource Management
- Planning, Market Analysis
- Conservation Education - Sup~rvision, Operations, Maintenance
- Supervision, Operations, Maintenance (Kortright)
(c) Conservation Education Development
6 Historical Sites
(a) Program Administration
(b) Operations and Maintenance
(c) Capital Development
The municipal share of expenditures on administration, operations and maintenance, and current programs comprise the
Authority's General Levy on all participating municipalities apportioned on the basis of equalized assessment as supplied by
the Province of Ontario.
The municipal share of expenditures on capital programs are financed as a Capital Levy on municipalities based on levies
designated in specific projects. Certain expenditures from special revenues and levy on hand are recommended
Land Acquisition Project, 1982-1984
This project was adopted by the Authority and approved by the municipalities on the basis of a 55% grant and all member
municigalities benefiting in proportion to their equalized assess~ent The Authority plans an expenditure of $650,000 for
1984, of which $292,500, being the municipal share, wi 11 be funded from levy monies on hand
Lake Ontario Waterfront Development Project, 1984
This project will be subm i t ted for approval on the basis of a 50% grant and all member municipalities benefiting in the same
proportion as that determined for the 1977-1981 project. The budget estimates for this project are found in the Finance and
Administration (WaterfrQnt Open Space Land Acquisition and Hazard Land Acquisition) and the Water Resource Division sections
of the budget document.
.
1983 09 19
Page 1-5
Projects for Erosion Control and Slope Stabilization in the Municipality of Metropolitan Toronto and Hie Reg i ona 1
Municipalities of Peel, York and Durham, 1982-1984
These projects were adopted by the Authority and approved by the municipalities on the basis of a 55% grant and each
municipality benefiting for the works carried out in the municipality. The 1984 municipal funding requirement is
Metropolitan Toronto $ 180,000
Peel 6,750
york 9,000
Durham 2,250
$ 198,000
These projects are budgeted for in 1984 as submitted
The 1984 Levy
The apportionment of the 1984 general levy is based on the 'discounted' equalized assessment in the Authority, in accordance
with information supplied to all Conservation Authorities by ~he Province of Ontario (Ministry of Municipal Affairs and
Housing) .
In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied an
amount equal to 100% of the 1983 taxes paid by the Authority for revenue producing conservation areas within those
municipali ties Within Metropolitan Toronto, Authority lands are not subject to taxation.
provincial Funding
The provincial grant structure used in the budget is based on the following approved percentages:
Admini stra tion 50%
Water and Related Land Management (includes Shoreline Management) 55%
Conservation and Recreation Land Management (includes Waterfront Development) 50%
1983 09 19 .
Page 1-6
The Authority will seek approval for the following level of funding from the Province of Ontario to finance the programs-set
forth in the 1984 Budget
Rate Reques~ed Approved Approved
of Grant 1984 1984 1983
% -r- $ $
ADMINISTRATION
A 1 to A6 inclusive 50 751,655 690,000
------- -------
------- -------
WATER & RELATED LAND MANAGEMENT
PROGRAM ADMINISTRATION
WI Flood Control - Wages, benefits & expenses 55 579,085 400,900
W2 Operation and maintenance of water control 55 117,562 200,000
W3 Conservation services 55 130,000
W4 Community Relations 55 101,380 99,000
W5 Taxes and Insurance 55 147,950 151,000
W6 General Expenses 55
W7 Urban/Rural Drainage 55 25,850 11,000
we Forest Management/Reforestation 55 73,425 31,525
W9 Soil Erosion & Sedimentation 55 62,425
SUB TOTAL 1,107,677 1,023,425
SURVEYS & STUDIES
Preliminary engineering 55 66,000
Environmental studies (E C.) 55 22,000
SUB TOTAL .!!8,000
1983 09 19
.
Page 1-7
Rate Requested Approved Approved
of Grant 1984 1984 1983
% $ $ $
WATER & RELATED LAND MANAGEMENT (contd.)
CAPITAL
Flood Control
Bolton remedial work 55 530,100
Hazard Land Acquisiton 55 357,500 150,000 ,
Pickering/Ajax remedial 55 192,500
Keating Channel 55 233,750
Goodwood Pumping station 55 . 96,250
Major Maintenanceland acquisition 55 23,925
Flood warning equipment 55 5,500
Flood plain mapping 55 120,000
SUB-TOTAL 1,029,425 680,100
Erosion Control
Highland Creek 55 297,000 82,500
Bellamy Road 55 852,500
Shoreline Management 55 335,500 270,000
Waterfront hazard land acquisition 55 66,000
Major maintenance 55 107,250
Metro Erosion Control 55 220,000 179,575
Peel Erosion Control 55 8,250 10,000
York Erosion Control 55 11,000 4,950
Durham Erosion Control 55 2,750
SUB-TOTAL 1,900,250 547,025
TOTAL WATER AND RELATED LAND MANAGEMENT 4,125,352 2,250,550
--------- ==:::::z======
---------
1983 09.19
.
Page l.:..!!.
Rate Requested Approved Approved
of Grant 1984 1984 1983
----,---- ----$--- ---T- ----T--
CONSERVATION & RECREATION LAND MANAGEMENT
-----------------------------------------
PROGRAM ADMINISTRATION
----------------------
C1 Salaries, wages & expenses * 50 877 , 550 750,000
C2 Conservation services 50
C3 Information and int~rpretation 50 30,400 28,140
C4 Taxes and insurance 50 34,650 40,460
C5 General expenses 50
C6 Fish & Wildlife 50 15,500
C7 Forest management 50 ___Jl..!!.1 550
-------
SUB-TOTAL b~Jj_L~J.Q !lJ.JlJ.ii~~_
SURVEYS AND STUDIES
-------------------
Boyd Master Plan 50 17,500 37,500
C1aireville study 50 17 ,500
Conservation Area master plans 50 ~]...!001.l
------
SUB TOTAL .?J...!~OO 3 7...!J~.Q
CAPITAL
--Outaoor Recreation
-Conseria-tlon-area development SO 231,325 80,000
Kortright development 50 50,000
Waterfront open space land acquisition 50 150,000
,
Waterfront development \ 50 __Jl]~ ' 000_ __jBJ~OO
SUB TOTAL . .!.L.?j}L3J2 _-..1}JJ~ 0 0
TOTAL CONSERVATION & RECREATION LAND MANAGEMENT 2,359,975 1,568,100
--------- ---------
--------- ---------
TOTAL FUNDING 7,236,982 4,508,650
--------- ---------
--------- ---------
* includes administration budgets for Waterfront Development, Conservation Land Management, Information and Education and
Historical Sites
1983.09 19
Page II-I
TIlE METROPOLITAN TORONTO AND REXiION CONSERVATION AlJI'HORITY ---
-----------------------------------------------------------
BASIS OF APPORTIOtfoIEllT - MUNICIPAL LEVY - 1984
BASED ON TIlE LATESI' EQUALIzEi)1iSsESS1ENT-PIGURES (DISCOONi'ED}AVAIIADLE TO THE Al1I'HORITY"
---DTscounted ----------"%Of---- Discounted EqualizJ-- Population
Equalized Municipali ty Assessment Total In
___..!!.J..r.1icipal i..!:.i'____________ ~sessmen~-- _.!!l-M..!:hori..!:.i'____ -,-.!.!l_~~~~~ __ Po~lation A~..!:hor i ty_____
,uOO's of o;>S J.,OOO S o~ 0;> s
Adjala Township 64,667 8 5,173 3,899 312
Durham, Regional Municipality of 1,277,001 * 1,002,050 75,909 61,103
Metropolitan Toronto 48,114,479 100 48,114,479 2,140,347 2,140,347
Mono Township 91,590 5 4,580 4,126 206
Peel, Regional Municipality of 11,639,388 * 4,923,577 506,421 219,462
York, Regional Municipality of -- 6~:~ft:~}-- --------.-:.--- --5~2~~i~~~~ --- --"2,~~~~6 2,~~~~~~: ----
___________________ ______________ __________ __::::J____________ __ ______
ANALYSIS OF REXiIONAL MUNICIPALITIES *
----------------
Durham, Regional Municipality of
Ajax Town 422,170 86 363,067 25,660 22,068
pickering Town 627,060 95 595,707 38,799 36,859
Uxbridge Town 227,771 19 43,276 11,450 2,176
_________________ -=1,277,001 ------===--= =--1,0.!l2,0.?0 ==- __-121909 - -==--=~J,10} =
Peel, Regional Municipality of
Brampton, City of 3,144,226 63 1,980,863 154,981 97,638
Mississauga, City of 7,861,929 33 2,594,436 324,853 107,201
Caledon Town 633,233 55 348,278 26,587 14,623
____________ -=1T;639,388_=- -=--======--==== =___~.!J23,577 ___ ---- 506 ill ==J19,462 ==--=
York, Regional Municipality of
Aurora Town 329,525 4 13,181 16,466 659
Markham Town 2,403,017 100 2,403,017 81,932 81,932
Richnord lIill Town 931,483 99 922,168 38,488 38,103
Vaughan Town 1,621,307 100 1,621,307 36,815 36,815
Whitchurch-Stouffvil1e Town 332,271 43 142,877 13,551 5,827
King Township ___ 409,255 ___ _______~_______ ____~.!t161.-- __~284 _ ____-,~878 __
__________ ___ 6,02~,858 __ ______________ _____.?.!}~~.!]J.?____ ______ 20",536 .:~21.!..-_
** As provided by the Ministry of Municipal Affairs and Housing for the 1983 fiscal year The equalized assessment data for the 1984 budget will be
made available in early 1984
,
1983.09 19 .
'lHE METROPOLITAN TORONl'O AND ,RmION CONSER~TION AIJI'HORITY Page II -2
1984 LEVY APPORTIONMENT USING DISCOONTED muALIZED ASS~T.
General aoo Capital Levy waterfront Project
excluding waterfront
Discounted Assessment
Discounted Assessment Proportionate 95% Metrojburham Proportionate
in Watershed Factor 5% Ad~ala/Mono/peel/York Factor'
(1,000'5 of $'5) ( ,000'5 of $'s)
Adjala 5,173 00008718064 5,173 .00002530811
Durham
Ajax 363,067
Pickering 595,707
Uxbridge 43,276
1,002,050 1,002,050 .01688756078 1,002,050 .01938140825
Metro 48,114,479 .81087389710 48,114,479 .93061859175
Mono 4,580 00007718679 4,580 .00002240695
Peel
Brampton 1,980,863
Mississauga 2,594,436
Caledon 348,278
4,923,577 4,923,577 08297710279 4,923,577 02408784403
York
Aurora 13,181
Markham 2,403,017
Rictarooo Hill 922,168
Vaughan 1,621,307
Whitchurch-Stouffvi11e 142,877
King 184,165
5,286, 715 5,286,715 08909707190 5,286,715 .02586444091
59,336,574 1 00000000000 59,336,574 1.00000000000
. As provided by the Ministry of Municipal Affairs and Housing for the 1983 fiscal year The equalized assessment data for the 1984 budget will be made
available in early 1984
1983 09.19
Page .!1:1
THE METROroLITl\N TORONTO AND REGION CONSERVATION AlJI'HORITY
AProRTIONMDIT OF 1984 LEVIES
rnNERAL PROJECTS - WATERSHED PLAN PROJECI'S - WATERFRONT
-----------------------------
198 4 GENERAL LEV Y WATERSHED PROJECTS WATERFRONT
SPECIAL
Before Tax Total Inc 1983 General Inc Capi tal Capi tal Highland Keating Bellamy Shoreline
~_ ~just __!djusbnent Tax Mjust _1'~ Adjss~nt_ All Ben. Ben .Mull . Total Creek Channel Road !?eve~.!l.!: ~.!13t~.!1.!:
$ $ -r----r----r-" --~-" ----r- --r-
Adjala 459 459 348 25 25 23
(c)
Durham 88,985 44,117 133,102 108,868 4,940 238,500 243,440 17 ,288
Metro
'l'oronto 4,272,708 4,272,708 3,236,427 237,181 180,000 417,181 243,000 191,250 697,500 830,112 328,500
Mono 407 407" 308 22 22 20
Peel 437,228 108,404 545,632 429,936 24,271 6,750 31,021 21,486
York 469,476 32,627 502,103 383,686 26,061 9,000 35,061 23,071
-5,269-;26T~85,1~ 5,454,411 4;159;5'73 292,500 434,250 - 726,750 243,000 -191,250 6 7,500 T~117,000---- 328,500"
(a) (b)
------------------ _E.2~ 500)___ (292 500) ----------- _<1~..900)________
5,269,263 185,148 5,454,411 4,159,573 -- 434,250 434,250 243,000 191,250 697,500 892,000 328,500
=================================================================================================================================================
OOTES
(a) $292,500 of the 1983 capital surplus has been credited to the 1984 Watershed projects, capital all benefiting municipalities.
(b) $225,000 of the 1983 capital surplus has been credited to the 1984 Waterfront Development (capital) all benefiting municipalities
(c) Includes $2,250 as part of the Erosion COntrol and Slope Stabilization Project, 1982-84, as well as $157,500 for completion of protection works on the
Duffin Creek in Pickering and Ajax, and $78,750 for the replacement of the Goodwood Pumping Station
1983 09 19
Page 111-1
LEGEND: Current Items - II
Capital Items - 00 \ BWGET SUl11ARY - 1984
l!\
1984 BUDGET OOURCES OF FlNAOCING 1983 BlDGET 1983 ACl'UALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDlTURFS REVENUES EXPENDITURES GRANT IEVY OTHER EXPaJOI'l\JRES REVENUES EXPENDITURES REVENUES
$ ~ $ $ $ $ $ $ ~ $
FlNAOCE & ADMINISTRATION
Administration II 1,513,310 1,513,310 751,655 751,655 10,000 1,380,000
General Expenses " 296,500 198,000 98,500 38 ,500 60 ,000 265,000 172,000
property Acquisition,
Maintenance & Management
Flood Control
Hazard Land Acquisition 00 550,000 550,000 302,500 247,500 550,000
Recharge;t>ischarge Areas 00 100,000 100,000 55,000 45,000
Waterfront Hazard
Land AcquIsitIon 00 120,000 120,000 66,000 54,000 325,000
Waterfront
Open Space Land Acqu' n 00 300,000 300,000 150,000 150 ,000 300,000
Legal Costs
Regulation Enforcement #I 12,000 12,000 6,600 5,400 11,000
Water & Related
Taxes II 258,000 258,000 141,900 116,100 260,245
Insurance II 11,000 11 , 000 6,050 4,950 14,300
Conservation & Recreation
Taxes II 58,300 58,300 29,150 29 , 150 67,200
Insurance II 11,000 11,000 5,500 5,500 13,720
1983.09 19
Page .!..Il:~
BrnGET SUl>Y-\ARY - 1984
----------------------------- -------------------------------------- ---------------------------------- ---------------------- ---------------------
1984 BUDGET SOURCES OF FINlIOCING 1983 BUDGET 1983 ACTUALS
ACTIVITY ------------ ------------ ----~---- PROvm:::iAL --"MUNICiPAL --- -------- -------- ----------- ------
EXPENDITURES REVENUES EXPENDITURE rnANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
----------------------------- -----V---- ---~----- ---V---- -----..~r---- ----.:~r----- ---"$--- -----v---- "$---- -----"$--- --"$----
WATER RESOURCE
-----------
Program Administration Ii 1,073,381 1,073,381 5~,485 486,396 14,500 861,186
Conservation Services Ii 112,000 112,000 61,600 50 , 400 20,000
operation & Maintenance -
Water Control Structures il 213,750 213,750 117,562 96,188 153,414
Erosion Control
- HighlarrlCl:eek 00 540,000 540,000 297,000 243,000 150,000
Bellamy Road 00 1,550,000 1,550,000 852,500 697,500
Shoreline Management 00 610,000 610,000 335 ,~OO 274,500 582, 500
Major Maintenance Dt 195,000 195,000 107,250 87,750
Studies II 40,000 40,000 22,000 18,000
Metro 00 402,000 2,000 400,000 220,009 180,000 396,500 11,500
Peel 00 18,000 3,000 15,000 8,250 6,750 35,600 5,600
York 00 20,000 20,000 11,000 9,000 23,500 3,500
Durham 00 5,000 5,000 2,750 2,250 5,000
Flood Control
- pi~iiira~--- U 473,500 473,500 215,425 108,075 150,000 53,000
RaneE a 1 00 1,000,000 1,000,000 522,500 427,500 50,000 1,283,000
Waterfront
Adiii'rn1"5trati on 00 269,000 269,000 132,000 137,000 211,239
Developrent 00 1,810,000 150,000 1,660,000 830,000 605,000 225,000 1,531,261 150,000
CXlNSERVATION LAND
-------MA~GEMENT
--------
Program ~ninistration Dt 804,711 804,711 402,356 402,355 673,204
,
1983 09.19
.
Page 1]}:1
BUDGET SUMMARY - 1984
----------------------------- ------------------------------------ ---------------------------------- ---------------------- ----------------------
1984 BUDGET OOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS
lICTIVITY ------- -------- --~----- - PROVlOCIAL -MUNiCIPAL ---- --- - --- -------
EXPENDI TURES REVENUES EXPENDITURES rnANl' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
---------------------------- ---$-- ---$'--- ----S--- -----S-- ---S----- --S ---S-- -S-- ---$--- --S--
Watershed Recreation
---------------------
,
Planning II 104,000 104,000 52,000 52,000 75,000
Developnent Ii 462,650 462,650 231,325 231,325 181,960
Operations tI 2,511,600 1,127,000 1,384,600 1,384,600 2,180,000 1,016,000
Conservation Land
Managenent tJ 539,500 165,500 374,000 204,150 169,850 438,181 134,000
INFORMA'rION & EDOCATION
----------------
Program Administration U 345,130 345,130 172,565 172,565 315,420
.
~l!1!!:Y_ Re}ati.9~__f.!1fo_r.!!l_
Support " 65,475 65,475 32,738 32,737 64,842
General If 84,127 84,127 45,270 38,857 80,127
Resource M;jt Prog ran s Ii 11 ,000 11,000 6,050 4,950 11,000
Planning/Market Analysis II 94,743 94,743 94,743 90,243
COl1lll!1 i ty_~!!.!-~ t i.9.!1.:>_ e:l~.!!.
Support Ii 35,982 35,982 17,991 17,991 35,108
Supervision Operation
& Maintenance " 1,261,560 1,119,500 142,060 60,060 82,000 1,273,083 1,136,300
Supervision Operation
& Maintenance -
Kortright it 478,600 286,500 192,100 20,400 137,500 34 , 200 442,000 264,850
Developnent II 191,000 191,000 50,000 50 ,000 91,000 114,800
1983 09 19
Page .!Y:.!
BUDGET SUMMARY
I
------------------------- -------------------------------------- --------------------------------- ---------------------- --------------------
.
1984 BUDGET . SOURCES OF FINAOCIOO 1983 BUDGET 1983 AcruALS
ACTIVITY ------- ---- --tiET---- PROVlOCIAL - MUNICIPAL - ------ ----- ---------- -------
EXPENDITURES REVENUES EXPENDITURES rnANt LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
-------~------ -r- --$""'- --~-- ~7r-'--- ---r-- --S-- -----$ $ ---r-- $'----
HISTORICAl, SITES
------------
Program Administration " 239,800 239,800 119,900 119,900 273,122
Operations &
Maintenance *' 1,851,200 1,009,500 841,700 631,700 210,000 1,487,200 1,025,000
Educational Programs U 142,674 148,750 (6,076) (6,076) 157,500 163,500
Capital Development 00 1,868,000 1,868,000 1,868,000 1,995,000
Visitors Centre U 67,500 42,700 24,800 24,800
~HIfLE &,~JI.!'~NT ~ #i 316,925 316,925 14 , 550 302,375 280,730
----------------------------- ----------- ------ ---------- ---------- ------------ --- --- --------- -------
OJRRENr 5,454,411
CAPITAL 2,786,500
----------------------------- ----- --------- ------ --------- ----------- ------- --------- - ---- -----
1984 TOTAL 23,037,918 4,252,450 18,785,468 7,236,982 8,240,911 3,307,575 18,591,374 4,082,250
1983 TOTAL* 18,591,374* 4,082,250 14,509,124 4,426,150 5,779,698 4,303,276
-------------------------- ------ --------- --------- ----------- ---------- ------- ------ ---- ------------ ----------
* This total excludes $2,123,808 of funding made available under the C.O.E.D. program for 1983.
1983 09 28
Page IV-l
1984 BUDGET
THE FINANCE AND ADMINISTRATION DIVISION
To support goals of the Authority, the responsibilities of the Division encompass financial
management and monitoring of financial procedures, compilation of budget, multi-year forecast and
provision of financial data and reporting as required
The Division is responsible for acquisitions and management of property, management of Authority
legal services, managemen~ of Authority's administration offices and grounds, and provision of
administrative services to all divisions of the Authority and management of Authority personnel
services
The Secretary-Treasurer is required to record the resolutions, decisions and other proceedings of
the Authority and to keep the originals of all minutes of the Authority and its .boards and
committees.
1983.09.19
,
.
,
Page IV-2
1984 BUDGET
1983 ACHIEVEMENTS
- Continued development and streamlining of computer based financial management and budget reporting systems
- Initiated internal audit procedures for cash and inventory control.
- Provided increased level of support as a result of the C 0 E D and Food Services Program
- Responded to Auditor's Memorandum of Recommendations and implemented many of its recommendations on strengthening internal
control.
- Finalized amendments to Authority's purchasing policy (planned for November 1983) .
,
1984 PRIORITIES
- To continue .
to provide an improved level of services within the ava Hable resources.
- To strengthen the system of internal audit procedures commenced in 1983
- To continue to improve on the financial management and budget reporting systems
1983 09 19
.
Page )V-l.
1984 BIlDGE'l'
DIVISION: Finance & Administration
---------------~--------------------
----------------- ---------~---------- ------~--------_.._--------- ----------------- ------------------
1984 BUDGET OOURCF,s OF FlNAN::ltoK; 1983 BUDGET 1983 ACWALS
PROGRAM ------------. NET -- PROVlocIA1:-- --MiJNICIPAL- ---- ------- ----- ----- -------
EXPrnDITURES REVENUES EXPENDITURES GRANT LEVY arHER EXPENDITURES REVENUES EXPENDITURES REVENUES
----------------- ---r---- --r-- -------"$----- ----"$------ -------$----- ---$---- ----$ --r- -----$--- ---S--
Program
Administration 1,513,310 1,513,310 751,655 751,655 10,000 1,380,000
I
General Expenses 296,500 198,000 98,500 38,500 60,000 265,000 172,000
.
Property
Acquisition,
Maintenance &
Mana<]Ement 1,420,300 1,420,300 762,700 365,100 292 , 500 1,541,465
.
----------------- -------- -------- -------- ------------ ---------- --------- ------------- ----- ----------- ---------
'f(YI' AL _ 3, 230,JJE___ _J98JEEE_ -1..!031..!JJ~_ _J..! 51~..!}.?.?___ _lLl.?.?..!.?:?.?__ __}62..!50~ _}, 18..?..!..!?.?__ _J]2,EEE_
----------------- ---------- ------
,
1983.09 19
Page IV-4
1984 BUDGET
DIVISION Finance and Administration
------------------------------------~
PROGRAM Administration
------------------------
PURPOSE
-------
To provide the administrative and financial services of the Authori ty
1984 OBJECTIVES
----------------.
Continuation of general administration and financial support services for all Authority programs, as well as expenses for
Authority members The salaries of the General Manager, Deputy General Manager, Secretary- Treasurer, associated secretarial
staff, and the staff of the Finance and Administration Division, which includes Land Acquisition, Personnel, Finance and
general office administration, are charged to this program The payment of members' per diem and kilometers and Authori ty
meeting expenses are included in the budge t The cleaning and maintenance of the administration headquarters is also funded
FUNDING
-----~
This is a shared program, financed by a grant from the Province of Ontario and the general levy on all part icipat i ng
municipali ties
FINANCIAL COMMENTS
-------------------
In 1984, as in ]983, employee benefits and Administrators' salaries are charged to each program
Salary increases are provided for on the basis of 5% p.conomic adjustment
OBJECTIVE CLASSIFICATIONS Members Equipment
-------------------------- Salarieg Fringe Salaries Material, Supplies Services Purchase & .
~!l3lges_. Benefits ~_ ~2'''p_e.!.~~ & Utilities & Rents Rental TOTAL
-------- ------------------- --------- ----------
$ 756,940 124,600 108,850 334,000 130,920 58,000 1,513,310
1983.09.19
Page IV-5
1984 BUDGET
DIVISION Finance and Administration
Program Administration --------------------------------------
----------------- ---------------------------------------- ------------------------------------ ------------ -----------------------
1984 BUDGET SOURCES OF FINAlCING 1983 BlDGET 1983 ACTUI\.LS
-------------- - ---NET-- PRovlOCiA1.- -~IcipA1.-- ------- -------- ---- ----------- ----------.
ACTIVITY
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY O'rIlER EXPENDITURES REVENUES EXPENDI'mRES REVENUES
----------------- --S-- $ -----S---- -----S-- ----S---- --"$"-- ----S---- ----"$"- ---S---- --$-----
Wages & Benefits 881,540 881,540 440,770 ,440,770 747,680
Travel Expense &
Allowal)ces
Regular 21,500 21,500 10,750 10,750 20,600
~bers 91,350 91,350 45,675 45,675 76,670
Equipnent
Purchase &
Rental 58,000 58,000 29,000 29,000 73,500
Materials &
Supplies i39,000 139,000 64,500 64 , 500 10,000 121,000
Rent & Utilities 195,000 195,000 97,500 97,500 247,550
General Expenses
Regular 109,420 109,420 54,710 54,710 75,500
~bers 17,500 17,500 8,750 8,750 17 , 500
----------------- ------- ----- ------------ ----------- ----------- --------- --------- ----- -~-------- --------
roTAL _l.! 51.i! 31~__ l.!~ 13 .!}.!Q... ___ 75l.!65~__ ____J5 ~.?~~__ __l~.! OO.Q.. 1.t3110 , ~~.Q.. --------- ---------
----------------- -------- -----
1983 09 19
.
Page IV-6
1984 BUDGET
DIVISION Finance and Administration
PROGRAM General Expenses
PURPOSE
To provide for a variety of support costs for which no provincial grant is available.
1984 OBJECTIVES
To continue to fund repairs and maintenance of rental properties and other general maintenance.
To continue to fund taxes and insurance on rental properties
To continue to fund the public liability insurance on vehicles and equipment.
To continue to fund the provision of adequate level of service at Authority and staff meetings and functions
FUNDING
Since no provision for these items is made in the Ministry of Natural Resources grant structure, the funding is entirely from
municipal levy and program revenues consisting of rental and i?lterest income
FINANCIAL COMMENTS
In 1984, as in 1983, net interest income is credited to the member municipalities' general levy
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services Interest
& Wages utilities & Rents Costs Insurance Taxes TOTAL
$ 12,000 26,000 98,000 25,000 22,500 113,000 296,500
1983 09 19
Page }V- 2.
1984 BUDGET
DIVISION Finance and Administration
Program: General Expenses -------------------------------------
----------------- ---------------------------------------- -------------------------------------- ----------------- -----------------------
1984 BUDGET SOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS
ACTIVITY ----- ------- -----1mT---- --PROVIOCIAL-- --iiiNlcu'A1-- ------- ------ ---- ----------- ----------
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPEND ITURES REVENUES EXPENDITURES REVENUES
----------------- --r----- --""T--- -----$------ ------$---- ----$---- ---$--- ---$"------ --$---- --$----- --$---
Authority & Staff
Meetings and
Functions 45,000 45,000 45,000 30,000
Vehicles & Equipt
Expenses 5,000 5,000 5,000 5,000
Staff & Authority
tanbers Long
Service &
Retirenent 6,000 6,000 6,000 6,000
Insurance 12,500 12,500 12,500 16,000
Miscellaneous 5,000 5,000 5,000 6,000
~!:!,lta1--.!'!.9~}}j~~ 80,000 80,000 60,000
MaIntenance
Realty Taxes 113,000 113,000 105,000
Insurance 5,000 5,000 7,000
Rental Iocane 198,000 (198,000) 172,000
Interest 25,000 25,000 (35,000) 60,000 30,000
----------------- ---------- ------- ----------- ------------- -------------- --------- ---------- ------ ---------- ----------
'lUl'AL ___ 296,~EE__ _..!-J.!l ,OO.Q.._ ___J.!l.!~EE-_ _____}8,~EE__ ___~E.tEEE_ ___}~~.! 000___ ..!-.?}.!.!l.!l.!l__ -------
----------------- ------------ -------
1983 09 19
Page IV-8
1984 BUDGET
DIVISION Finance and Administration
PROGRAM Property Acquisition, Maintenance & Management
.
PURPOSE
. To fund the acquisition of lands required in carrying out various programs of the Authority
. To provide for costs associated with taxes on non-revenue producing areas and liabi li ty insu~ance on Authority lands unde~
Water and Related Land Management Programs and Conservation and Recreation Land Management programs.
To provide for legal costs associated with the Authority's regulation enfo~cement
1984 OBJECTIVES
.
The acquisition of lands and p~operty interest
,
- to facilitate construction of the proposed pickering/Ajax Dyke and Flood Control Works at German Mills Creek;
- at flood vulnerable and prio~ity valley land locations;
- to facilitate e~osion control works including the purchase of endangered residences along Scarbo~ough Bluffs;
To acquire
- key properties along the Lake Ontario Shoreline;
- environmentally significant areas in the Headwaters of the Wateished
FUNDING:
The funding for this program is on a shared basis with 55% (Water and Related Land Management Programs) and 50% (Conservation
and Recreation Land Management Program) of the funds being available from the province of Ontario and the balance being funded
by general, capital or Wate~front Plan levy on all participating or benefiting municipalities
FINANCIAL COMMENTS
The funding for realty taxes does not make allowances for any market value assessment that may be implemented in 1984.
OBJECTIVE CLASSIFICATIONS Mate~ials
Salaries Supplies & Real Services
& Wages Utilities Property & Re41 ts Taxes Insurance TOTAL
$ 1,070,000 12,000 316 I 300 22,000 1,420,300
1983.09 19
.
1984 ~rnGET Page }.y..:-2.
DIVISION: Finance and Administration
Program: Property Acquisition, Maintenance & Managenent ---------------------------------------
--------- --------------------- ---------------------------------- ----------- ---------------------
1984 BUDGET OOURCES OF FINAOCING 1983 BUDGET 1983 ACTUALS
ACTIVITY - ---NET ---- - PROVIOCIAL-- - MUNICIPAL -------- ----------- -------- ---------- ----------
EXPEND ITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
---------------- ---S--- -$--- --$----- ----$----- ----S--- --$---- ----$-- $ -$--- ---$---
Flood Control
LarrlAcqu1sTEion 550,000 550,000 302,500 247,500* 550,000
Flood Control
RechargeY-
discharge areas 100,000 100,000 55,000 45,000*
Waterfront Hazard
r.aooAcqu1S11:lOn- 120,000 120,000 66,000 54 ,000 325,000
Waterfront
o~n Space Land
Acquisition 300,000 300,000 150,000 150,000 300,000
~~i-.f~E}~
Regu atlOn
Enforcenent 12,000 12,000 6,600 5,400 11,000
Water & Related
Taxes--------- 258,000 258,000 141,900 116 , 100 260,245
Insurance 11,000 ll,OOO 6,050 4,950 14 , 300
Conservation & ..
Recreation
Taxes ----- 58,300 58,300 29,150 29,150 67,200
Insurance ___}..!-,OOO__ ___..!-1,.!l00___ ______~.!~E.Q.._ ______~.!~OO__ ____}1I]}.Q..__
----------------- ------ -------- ---- --------- -------
'lUl' AL 1 420,300 1,420,300 ___]~}.t.?00 _ 365,100 292,500 1..!54l,46~ ------
-M.mic1pal share unded fran lelT1eson harrl -------- ------------- -------- ------ ---------
1983 09 19
Page V-l
1984 BUDGET
THE WATER RESOURCE DIVISION
---~-------------~
This Division is responsible for the carrying out of the approved water management policies and programs
of the Authority, as they apply to the river systems and the Lake Ontario Waterfront, including
- administration of the Flood Control Program;
- administration of the Authority's Erosion and Sediment Control Program, including the Lake
Ontario Shoreline;
- administration of the Storm Water Management Program;
- administration of the Waterfront Development Program;
- the development and operation of a Flood Warning System;
- technical advice and direction concerning the enforcement of the Authority's fill regulations
and development control;
- the administration of the Authority's plan review function related to the Authority's fill and
construction regulations in co-operation with the member municipalities and the Province of
Ontario;
- long range planning and policy development related to Divisional responsibilities;
- environmental monitoring and review of flood control and waterfront projects;
1983.09 19
Page V-2
1984 BUDGET ---
1983 ACHIEVEMENTS
- Continued flood control remedial measures at Bolton and maintained existing flood control structures and channels
- Operated and maintained flood control dams and Flood Warning and Flood Forecasting system
- Provided protection from erosion and slope instability at priority sites in Metropolitan To~onto, Peel, York, Durham and
along the Lake Ontario shoreline; completed Phase I of the Highland Creek remedial measures
- Commenced preparation of Master Drainage Plans
- Participated in municipal plan input and review process, including regulation administration
- Commenced work at Colonel Samuel Smith and East Point Waterfront Areas.
- Completed servicing and site stabilization at Bluffers Park
1984 PRIORITIES
- Complete flood control remedial measures at Bolton and on Duffin Creek (Pickering/Ajax)
- Commence dredging of the Keating Channel
- Prepare flood plain mapping of headwaters areas
- Continue the preparation of Master Drainage Plans and implement soil erosion and sediment control program.
- Operate and maintain existing erosion and flood control works, including dams and the Flood Warning and Flood Forecasting
System; replace the Goodwood Pumping Station
- Carry out erosion control works on a priority basis in Metropolitan Toronto, Peel, York and Durham and along the Lake
Ontario shoreline; continue works on the Highland Creek; commence Phase I of the Bellamy Road Ravine Project.
- Continue development at Colonel Samuel Smith, East Point, Ajax and Bluffers Phase II Waterfront Areas
- Complete development at Humber Bay West
,
1983 09.20
,
Page Y.-l
1984 BlDGET
DIVISION Water ReOOurce
---~- ----- ----- -------------------------
1984 BlDGET OOURCES OF FINAN;::ING 1983 BlDGET 1983 ~~___
PROGRAM - NET PROVIOCIAL MUNICIPAL
EXPEND I TURES REVENUES EXPENDITUR~ GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REWNUES
-~---- --$ $-- -r- $--
$ :;; $ $ $
Program
Administration 1,073,381 1,073,381 572,485 486,396 14,500 861,186
Conservation
Services 112,000 112,000 61,600 50,400 20,000
Operation and
Maintenance -
Water Control
Structures 213,750 213,750 ll7,562 96,188 153,414
Erosion Control 3,380,000 5,000 3,375,000 1,856,250 1,518,750 1,193,100 20,600
Flood Control
Planning and
Renedia1 Works 1,473,500 1,473,500 737,925 . 535,575 200,000 1,336,000
-------- -- - --- -- -
'lUl' AL 6,252,631 5,000 6,247 ,631__1-. 3,342.t!l~ _.b~ 87.tl.!l1.. 214,500 3,563,700 20 ,600 -
-
19113 09.19 .
Page V-..!
1984 BUDGE'r
DIVISION Water Resource
PROGRAM Program Administration
PURPOSE
---
To provide administrative, planning, biological and engineering staff necessary for implementing 1984 programs
1984 OBJECTIVES:
- To carry out the 1984 work programs within the Flood Control, Erosion Control and Planning and Environmental categories
within the funding limits.
FUNDING
--
This is,a shared program, 55% of the funds being available from the .province of Ontario and the balance being funded from the
general levy on all participating municipalities ,
FINANCIAL COMMENTS
----~
OBJECTIVE CLASSIFICATIONS Materials
- --- Salaries Supplies & Real Services
~ages Utili ties E9.?J.~ent Pr~erty & Rents TOTAL
-- ---
$
1983 09 19
Page Y:2
1984 BllXiET
DIVISION: Water Resource
Program Program Administration -----
------- - -~-- -------
1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACI'UALS
----- PROVIOCIAL MliNICIPAL ----- -----
ACTIVITY NET
~XPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
-------~ -~ ~ ~ -$-- -- $ $ $ $ $ -$--
Salaries 778,043 778,043 427,924 350,119 649,107
Benefits 184,638 184,638 101,551 83,087 111,537
.
Travel 14,700 14,700 8,085 6,615 14 ,000
Water 'l11ene
Co-ordinator 29,000 29,000 - 14,500 14,500 22,242
Enforcenent
Officer Travel 18,500 18,500 10, 175 8,325 17,600
Technical Maps
Legal 9,500 9,500 5,225 4,275 9,000
Data Processing 5,500 5,500 3,025 2,475 5,500
.
Flood Control
Workshop 3,500 3,500 3,500 3,500
Regulations -
Fill &
Construction 30,000 30,000 16,500 13,500 28,700
--- ------ ----------- -----~- ---- ----- ---- ------ ---
'lUl' AL 1,073,381 _ 1,071138~ _~482- __~.!l6, 396 _ 14,500 861,186 ---- ------
------ - ------
1983 09 19
\
.
Page V-~
1984 BUDGET
DIVISION Water Resource
PROGRAM Conservation Services
PURPOSE
To carry out urban storm water management and master drainage planning studies and to carry out remedial control works where
the prime objective is to reduce sedimentation
1984 OBJECTIVES
- To carry out master drainage planning of the Authority's urbanizing watersheds such as the Rouge and Duffin Creeks
- To carry out minor erosion and sediment control projects at six sites within Metropolitan Toronto.
FUNDING
--
The Urban/Rural drainage is a generally benefiting program which receives a 55% grant from the Province of Ontario
The soil erosion and sediment control project is a Metropolitan Toronto benefiting project and forms part of the Metropolitan
Toronto Erosion Control project 1982-1984 and receives a 55% grant from the province of Ontario.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
& Wages Utilities ~~ipme~ prop~rt.Y & Rent~_ TOTAL
$
1983 09 19
page Y:2.
1984 BUDGET
DIVISION water Resource
Program Conservation Services
--- --- - - ------ -- ~-----
1984 BUDGET SOURCES OF FI NAOC ING 1983 BlDGET 1983 ACTUALS
ACTIVITY -- - - NET -- PROVIOCIAL MUNICIPAL -- ------ ~-
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ ---$--- --S- $ $ --r $ --$--
urban/Rural
Drainage 47,000 47,000 25,850 21 , 150 20,000
Soil Erosion &
Sediment Control 65,000 65,000 35,750 29 , 250
(>
------- ----- - --~-- ~-~-- -~---- -- ----- ----- -- ---------
'lUl'AL 112,000 _ 112.!00.Q..__ _~~OO___ __~E.!~E.Q..__ 20,000
--------~ - - ----- -----
1983 09.19
,
Page V-l!.
1984 BUDGET
DIVISION Water Resource
PROGRAM Operation & Maintenance/Dams, Channels, Erosion Control Structures
PURPOSE
To maintain existing erosion and flood control capital works, the flood warning system and the operation of major flood
control dams
1984 OBJECTIVES
- To provide regular maintenance for the Authority's flood control, erosion control and shoreline management works
FUNDING
----
This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services Survey &
& Wag~ Utilities !:.Slu i pm e n t: Pr~erty & Rents _ Leg al...._ TOTAL
$
1983 09 19
page V-.2.
1984 BUDGET
DIVISION Water Resource
Program qJeration & MaintenancejDams, Channels, Erosion Control Structures
1984 BUDGET SOURCF.s OF FINAOCING 1983 BUDGET 1983 ACTlJALS
ACTIVITY NET PROVIOCIAL --
MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDI~~ REVENY~ ~_EXPENDITURES REVENUES
- $ $ $ ---$- $ $ $ $ $ --S-
SnaIl Dams 15,000 15,000 8,250 6,750 14 ,000
Erosion ~rks 22,000 22,000 \ 12,100 9,900 7,000
I
Regular Mainte- e 0
nance - Water
Control
Structures 100,000 100,000 55,000 45,000 75,000
Claireville Dan 18,000 18,000 9,900 8,100 14,334
G Ross Lord Dan 12,000 12,000 6,600 5,400 9,704
Flood warning
Systan 46,750 46,750 25,7l2 21,038 33,376
- - -. -- ----
'lUl'AL 213 750 213,750 117,562 96,188 ---- l53.!414
- - -
1983 09 19
Page Y::!.Q
1984 BUDGET
DIVISION Water Resource
PROGRAM Erosion Control
PURPOSE
--
To minimize the hazards of erosion to life and property within the valley systems and the Lake Ontario shoreline
1984 OBJECTIVES
- Erosion Control work on the East Branch of the Highland Creek
- To carry out remedial protection works on a priority basis on the major valleys within Metropolitan Toronto.
- To carry out the first phase of the Bellamy Road Ravine Project
- To carry out remedial measures on a priority basis along the Lake Ontario shoreline
- To carry out remedial works on a priority basis on the major valleys in the Region of Peel
- To carry out remedial works on a priority basis on the major valleys in the Region of York
- To carry out remedial works on a priority basis on the major valleys in the Region of Durham
- To continue to update and augment the current erosion inventories and priority li sts
FUNDING
The Highland Creek, Metro Erosion Control, Bellamy Road Ravine and the Shoreline Management Projects are Metro Toronto
benefiting and receive a 55% grant from the Province of Ontario.
The Peel, York, Durham erosion control projects are Peel, York and Durham benefiting respectively and receive a 55% grant
The priorization study is a generally benefiting project and receives a 55% grant from the Province
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services Survey &
.!.....!lages Utilities Equipment Pro"p'erty. & Rents Leg a 1 TOTAL
$
1983.09 19
.
Page V-ll
1984 BUDGET
DIVISION l'later Resource
Program Erosion Control ---
- - --- ---------
1984 BUDGET SOURCES OF FlNAOCING 1983 BUDGET 1983 AC'l'UALS
---- PROVIOCIAL MUNICIPAL
ACTIVITY NET
EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
- $ $ $ $ $ $ $ $
Highland Creek 540,000 540,000 297,000 243,000 150,000
Bellamy Road 1,550,000 1,550,000 852,500 697,500 --
Shoreli ne tt:lt 610,000 610,000 335,500 274,500 582,500
Erosion Control
Major Maint 195,000 195,000 107,250 87,750 --
Priorization/
EnvirolTllental
Studies 40,000 40,000 22,000 18,000 --
Metro 402,000 2,000 400,000 220,000 180,000 396,500 11 , 500
Peel 18,000 3,000 15,000 8,250 6,750 35,600 5,600
York 20,000 20,000 11 , 000 9,000 23,500 3,500
Durham 5,000 5,000 2,750 2,250 5,000
.
-- - -- ----- 1-- -- - --- -----
'lUl' AL 3,380,000 5,000 - 3,375,000 1,856,2~.!l_ ~, 518, 75.!l_ ---- 1,193,100 20,600 -- --
1983 09 19
.
Page V-12
1984 BUDGET
DIVISION Water Resource
-----
PROGRAM Flood Control Planning and Remedial Measures
PURPOSE
---
To undertake a comprehensive program of flood control designed to prevent, eliminate or reduce the risk of hazard to li fe and
property, while cognizant of the natural attributes of the valley system.
1984 OBJECTIVES
- Completion of the Bolton flood protection works
- preliminary engineering studies on Black Creek in the City of York, Don River at Bayview and Bloor, and an update of
Authority hydrology
- Completion of flood protection works on Duffin Creek in pickering and Ajax
- Detail design and first phase of dredging of the Keating Channel
- Replacement of Goodwood Pumping Station
- purchase of flood warning equipment
- New floodplain mapping of headwater areas under Canada/Ontario Flood Damage Reduction Program.
FUNDING
--
This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities except for the Pickering/Ajax project and the Goodwood Pumping Station which
are Region of Durham benefiting and the Keating Channel which is Metro Toronto benefiting
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
-------------------------- Salaries Supplies & . Real Services
~ Wages__ utilities Eq u i pme.!l..!. propert:.Y & Rents TOTAL
---
$
1983 09 19
Page V-13
1984 BUDGET
DIVISION: Water Resource
Program: Flood Control Planning and Renedial Measures ---
-- ---
1984 BUDGET SOURCES OF FINAOCING 1983 BUDGET 1983 ACI'UALS
ACTIVITY NET PROVIOCIAL MUNICIPAL -
EXPENDITURES REVENUES EXPEND I 'l'URES GRANT LEV'! OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ ""T $ ~ $ $ ~ f1 $ $
Bolton Renedial
Works 50 , 000 50 , 000 50 , 000 1,135,000
Flood Control
Eng Studies 120,000 120,000 66,000 54 ,000 25,000
Envirorroental
Studies 13 , 500
Pickering/Ajax
Ranedial Works 350,000 350,000 192,500 157,500
Keating Channel 425,000 425,000 233,750 191,250
Goodwood 175,000 175,000 96,250 78,750
Flood Control
Major Maint 43,500 43,500 23,925 19,575 148,000
Flood Warning
Equipnent 10,000 10 , 000 5,500 4,500 14 , 500
Floodplain
Mapping 300,000 300,000 120,000 30,000 150,000
- -
'lUl' AL 1,473,500 1.473,500 737,925 535, 57?_ t-lOO,OOO 1 33.6,000
-
1983 09 19
I
,
Page V-14
1984 BUDGET
DIVISION Water Resource
-----
1984 BUDGET SOURCES OF FINAOCING~. 1983 BUDGET 1983 ACTUALS -
PROGRAM NET PROVINCIAL MUNICIPAL~~
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~EVENUES
~ $ $ $ $ $ $ T $ -- ----r--
Waterfront .
Administration 269,000 269,000 132,000 137 , 000 211,239
Lake ontario
Waterfront
Developnent 1,810,000 150,000 1,660,000 830,000 605,000 225,000 1,531,261 150,000
--- -
'lUl'AL 2,079,000 150,000 1,929,000 962,000 74} , 009_r--J.25 , 000 ~2,500 150,000 -
1983 09 19
.. .
Page Y_-15
1984 BUDGET
DIVISION Water Resource
------------
PROGRAM Waterfront Administration
-----------------..
PURPOSE
--
,
To provide administrative, planning, biological and engineering staff necessary for implementing Waterfront projects.
1984 OBJECTIVES
- To proceed with design and construction of waterfront areas
- To proceed with planning and approval submissions for future waterfront works
FUNDING
--
This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities
FINANCIAL COMMENTS
--- --
OBJECTIVE CLASSIFICATIONS Materials
----- Salaries Supplies & Real Services
& Wages Util i ties ~~j-p~en_t: ~~~_E.!Y. & Rents TOTAL
------ ---
$
-
1983 09 19
Page V-li
1984 BUDGET
DIVISION Water Resource
Waterfront Administration -----------
Program
---_. - -
1984 BUDGET SOURCES OF FINAOCING' 1983 BUDGET 1983 ACTUALS
- NET PROVIOCIAL MUNICIPAL
ACTIVITY
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~~S
--- $ $ $ $ $ $ I? $ $ $
Salaries 179,952 179,952 89,976 89,976 132,075
Benefits 60,000 60,000 30,000 30,000 58,164
Travel 9,000 9,000 4,500 4,500 9,000
Data Processing 5,048 5,048 2,524 2,524 5,000
General Expenses 10,000 10 ,000 5,000 5,000 7,000
W.F WOrkshop 5,000 5,000 5,000
,
e
-- -- --
'lUl' AL 269,000 269,000 132,000 137,000 211 239
- -
1983 09 19
Page Y_-12
1984 BUDGET
DIVISION Water Resource
-----
PROGRAM: Lake Ontario Waterfront Devel02ment
PURPOSE
-----
The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline, within the area of the Authority's
jurisdiction, a handsome waterfront, balanced in its land uses, which will complement adjacent areas, take cognizance of
existing residential development and make available, wherever possible, features which warrant public use
1984 OBJECTIVES
--~---
- Continue development at Colonel Samuel Smith Park and East Point Park
- Complete development at Humber Bay West.
- Continue development of Ajax Waterfront
- Construct changehouse and washroom at Bluffers Park Phase II
. .
FUNDING
This is a shared program, 50% of the funds being available from the provinae of Ontario and the balance being funded from the
Waterfront Capital Levy on all participating municipalities
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
~ Wages Util !ties ~.9.~me n t pro~ert.Y & Rents TOTAL
--
$
1983 09 19
Page V-18
1984 BUDGET
DIVISION Water Resource
progran Lake Ontario Waterfront Developnent - Capital ---~--------
-- - -.- --- ---~--
1984 BUDGET SOURCES OF FINI\tr.ING 1983 BUDGET 1983 ACTUALS
NET PROVIOCIAL MUNICIPAL --
AcrIVITY
EXPENDITURES REVENUES EXPENDITURES GRANT r--~~ OTHER EXPENDITURES REVENUES EXPEND ITURES REVENUES
- $ $ $ $ -- -S $ $ -S- -$-
$
San sni th 487,000 150,000 337,000 168,500 168,500 400,000 150,000
Humber Bay West 100,000 100,000 50,000 50,000 130,000
Aquatic Park
Master Plan 62,000 62,000 31,000 31,000 40,000
Bluffers Toplands 100,000
Bluffers Park
Phase II 510,000 510,000 255,000 30,000 225,000* 330,000
\
East Point Park 400,000 400,000 200,000 200,000 344,261
Ajax Waterfront 60,000 60,000 30,000 30,000 30,000
Sundry Sites 55,000 55,000 27 , 500 27 , 500
WF Workshop 10,000 10,000 5,000 5,000
East Point E.A. 50,000 50,000 25,000 25,000
site Planning 10 ,000 10,000 5,000 5,000
Env Studies 66,000 66,000 33,000 33,000 72,000
Marie CUrtis 55,000
Ashbridges's Bay 5,000
Petticoat Creek 5,000
Pre.Dev Prop 20,000 -
'lUl' AL 1,810,000 150,000 1,660,00E___~~30,OOO 605,000 __ 225,000 _..!-,53l,26l 150,000 - -
LeVIes on hand
1983 09.19
page VI-l
1984 BUDGET
THE CONSERVATION LAND MANAGEMENT DIVISION
,
This Division is responsible for the Watershed Recreation Program which includes the planning,
development, operation and maintenance of recreational uses of conservation lands and all
related activities inc1udi ng the operations of the Authority's central stores.
This Division is responsible for the implementation and administration of the Conservation Land
Management program for private landowners and the resource management of lands acquired as part
of the Flood Control and Waterfront programs, except those under management agreements with
municipalities.
.
1983.09 19
.
1984 BUDGET Page VI-2
1983 ACHIEVEMENTS
Conservation Land Management
Developed new E S.A. management program .
Expanded Authority nursery operation
Intensified forest management programs on Authority owned lands
Completed projected resource management programs: reforestation, tree and shrub, stream improvement and woodlot management
Watershed Recreation
Preparation of Boyd Master Plan
Further restoration work on Bruce's Mill
Construction of Albion Hills washroom and picnic shelter; Indian Line Campground Control Building and laundromat
Development of Equestrian Centre at Clairville
Extension to Cold Creek Trap Range Building
Operated and maintained 7 Conservation and 3 Forest and Wildlife Areas providing 1 million user days of recreation
Upgraded and developed nature trails
Designed and installed information boards and reviewed Area signage
Continued visitor services programs including group canoe course
Revised lifeguard manual and continued water sampling program.
1984 PRIORITIES
Conservation Land Management
,
- To carry out new E.S A management program on Authority, pUblic and private lands
- To increase forestry management programs on Authority lands.
- To ~ontinue resource management planning activities for private, public and Authority lands.
- To increase sediment control program activities.
Watershed Recreation
- To operate and maintain 7 Conservation Areas and 3 Forest and Wildlife Areas.
- To maintain 2 Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use.
- To continue visitor service program.
- To maintain high level of winter safety
. - To obtain approval under the Environmental Assessment Act for Boyd Master Plan; continue work on other Area Master Plans;
and carry out an economic feasibility study for Claireville Conservation Area.
- To develop permanent washroom and refreshment facilities at Claireville; repair the Cold Creek rifle range shelter; complete
the final phase of development of the Indian Line Campground; and improve visitor access at Petticoat Creek and Indian Line
1983 09.19
Page YI -l
1984 BUI:lG:'r
DI VIl'l ION: _~ervati.9.!!..Y'~_ Man?9.anent
-------- ------------ -------------------- - -------------...
1984 BUDGET OOURCES <F FI~ING 1983 BmGET _1983 ~~_______
PROGRAM ------ --NET - PROVIOCIAL - MUNICIPAL --- --
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPaIDITURES REVENUES EXPENDITURES REVD/UES
------- $ - ~ --r-- --$ $ $ -- $--- -----$-- ----S---
Program
Administration 804,711 804,711 402,356 402,355 673,204
Watersha:1
--~
RecreatIOn
- P laririIiij 104,000 104,000 52,000 52,000 75,000
- Developnent 462,650 462,650 231,325 231,325 181,960
- Operations 2,511,600 1,127,000 1,384,600 1,384,600 2,180,000 1,016,000
Conservation Land
-Him~ement--
:.-p annTrij 133,500 133,500 73,425 60,075 118,500
- Tree Planting/
Forest folJt 326,500 165,500 161,000 88,550 72,450 267,881 132,000
- Soil Erosion/
Sediment
Control 48, 500 48 ,500 26,675 21,825 41,300 2,000
- Fish,Mildl,ife
Management 31,000 31,000 15 , 500 15,500 10,500
------- ----- ----------- ----------- ---- ------- ------ -------- ---------
'lUl'AL 4, 422.146.!.. 1, 292 ,50.Q.. 3,129.!96l ___ 889.!83l _~ 24.!l.rl}~_ __}.!_548,345 1,150,000 --------
------- ----- ----------
\
1983.09 19
Page y!..=.!
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Program Administration
PURPOSE:
To provide support services, to administer and develop Authority owned conservation lands and to provide a program of
conservation land management on public and private lands. Administration of the Central Services Workshop.
1984 OBJECTIVES
- To provide adequate staff and services to implement the 1984 program.
FUNDING
This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
& Wages utilities Equipment Propert~ & Rents TOTAL
$ 759,736 22,250 22,725 804,711
1983 09 19
1984 BlDrnT Page YI-1
Program Administration DIVIS1Ot!._~~}vatio!l-.!-a~~_~039~.!
Program:
----------------- ------ ---- -- ----------------------------------- ------------ ----- -
-- 1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS
ACTIVITY -~ PROVIOCIAL" -MUNICIPAL - ---------- -- -------- ----
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
---------- $ - $ $ ----$---- ---$--- ---"$ -----r-- S- ---"$--- ----$--
!lead Office
- Saianes&" Wages 321,553 321,553 160,777 160,776 299,512
Travel 15,525 15,525 7,762 7,763 14 ,000
Benefits 346,760 346,760 173,380 173,380 248,374
Util i ties &
Services 6,600 6,600 3,300 3,300 8,900
Central Services
Salaries & Wages 91,423 91,423 45,712 45,711 83,518
Travel 7,200 7,200 3,600 3,600 4,000
Util i ties &
Services 15,650 15 ,650 7,825 7,825 14 ,900
---------------- --------- ------- ------ ---------- -------- ------- --- -- ------- --------
'lUl' AL 804.1 711 ___ 804,711 40}.!}56___ __ 40}.! 35~_ ___~J3,204 ----------- ---------
----- ----
1983.09 19
,
.
Page VI-6
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Watershed Recreation Program - Planning
PURPOSE
To provide long-term and site planning for the development and operation of Conservation Areas and Forest and wildlife Areas
1984 OBJECTIVES:
- To obtain approval of the Boyd Master Plan under the Environmental Assessment Act, 1975.
- To proceed with the preparation of detailed design drawings and specifications for facilities proposed in Phase I of the
Boyd Master Plan
- To carry out a market analysis and economic feasibility study for existing and proposed recreational opportunities in the
Claireville Conservation Area.
- To complete the preparation of Conservation Area Master Plans.
FUNDING
This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
& Wages Utilities Equipment Property & Rents TO'fAL
$ 27,740 4,460 1,800 70,000 104,000
1983.09 19
.
Page VI -2.
1984 BUDGET
watershed Recreation - Planning DIVIl'ION.:__ Conser'y.?}io.!l-1-.?~~~..!:.
Program:
-------- ------------------- ---- . ----------------- -- --- -----------------------
1984 BlJDGET SOURCES OF FINAOCING 1983 BWGET 1983 ACTUALS
ACl'IVITY ----- NET PROViocIAL-- MUN'iCIPAl.- ------ ------ ------
EXPENDITURES REVENUES EXPENDITURES rnANT LEVY OTHER EXPENDITURES REVENlIES EXPENDI TURES REVENUES
-- $ $ $ --$--- -----:[--- ---$ ---r-- $ $ ---"$--
Boyd Master Plan
E.A. Approval 25 ,000 25,000 12,500 12,500
Boyd Master Plan
Phase I Site
Planning 10,000 10,000 5,000 5,000
Claireville
Feasibil i ty
Study 35,000 35,000 17,500 17,500
General Planning 34,000 34,000 17,000 17 ,000
Boyd Master
Plan, Stage II 75,000
\
---------- 1------- ---- 1-------- ------------ ----------- ----- -------- ----- ---------- -------
'lUl'AL 104,000 ____..!-04~ ____~2, 000 __ ____~_~E.!l_ --------- ____J11 O(jo__ -------- ~--------- -------
----- --
1983 09.19
, .
Page VI-8
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Watershed Recreation - Development
PURPOSE
To develop grounds, facilities and services to provide outdoor recreation opportunities in accordance with the policies and
program direction as established in the Watershed Plan .
1984 OBJECTIVES:
- To construct a washroom and refreshment building in the beach area at Claireville Conservation Area and a washroom and
shelter in the main picnic area at Heart Lake.
- To reconstruct the rifle range building at Cold Creek to meet O.P.P. safety standards
- To complete campsite development at Indian Line and construct a pedestrian pathway to link the campground with the day use
area in Claireville.
- To relocate the control booth at the Petticoat Creek pool to allow all area visitors use of washroom facilities.
.
FUNDING
This is a shared program, 50% of the funding being available from the Province of Ontario and the balance being funded from
the general levy on all participating municipalities
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Real Services
& Wages Utilities Equipment Property & Rents TOTAL
--
$ 181,300 281,350 462,650
1983 09 19
1984 BlDGET Page VI -9
DIVISION Conservation Land Managenent
Program: Watershed Recreation - Developrent
1984 BUDGET OOURCES OF FINAOCrNG 1983 BWGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITlJRF,S GRAN!' LEVY OTHER EXPENDITURES RIMlWES EXPENDITURES REVENUES
-S :;; $ :;; -$ $ I? $ $ :;;
BO:A - Award Day 1,650 1,650 825 825 1,650
C'ville - Washrm.
Refresltnt.Bldg 200,000 200,000 100,000 100,000
Cold Creek -
Rifle Range 31,500 31,500 15,750 15,750
Heart Lake -
Washrm ./Shelter 80,000 80,000 40,000 40,000
Indian Line Camp-
ground Extension 120,000 120,000 60,000 60,000
Indian Line -
Pedestrian Path 15 f 000 15,000 7,500 7,500
Petticoat Creek - ,
.
Control Booth 14,500 14,500 7,250 7,250
Access -
Disabled Persons 21,960
Albion Hills -
Washrocrns 71 ,000
Indian Line -
Control Bldg . 86,000
Cold Creek -
Entrance Dev. 1,350
'lUl'AL 462.650 462,250 231,325 231,325 181,960
1983 09 19
t
.
page VI-lO
1984 BUDGET
DIVISION Conservat~on Land Management
PROGRAM Watershed Recreation - Operations and Maintenance
PURPOSE
To provide funding for the operations and maintenance component as identified in the Watershed plan for providing recreation
opportunities on Authority lands.
1984 OBJECTIVES
_ To operate and maintain seven Conservation Areas and three Forest and Wildlife Areas to provide 1.1 million user days.
_ To maintain two Forest and Wildlife Areas and the Woodbridge Flood Plain for non-revenue recreational use.
_ To continue self-supporting visitor services programs to increase accessibility of recreation opportunities
- To maintain a high level of visitor safety.
FUNDING
Program revenues provide approximately 45% of required funding, the balance being a general levy on all participating
municipal! ties.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services
& Wages utilities Equipment & Rents Taxes TOTAL
$ 1,453,800 563,450 289,400 204,950 2,511,600
.
.
1983.09.19
.
Page VI-ll
1984 BlDGET
DIVISION Conservation Land Management
Program watershed Recreation - Operations and Maintenance
1984 BUDGET SXJRCES OF FINAOCING 1983 BlDGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES I EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ $ ~ $ $ $ $ $ $
,
Albion Hills 395,350 204,500 190,850 190,850 361,300 180,000
Boyd 248,850 105,000 143,850 143,850 210,950 103,000
Bruce's Mill 299,450 164,400 135,050 135,050 268,250 150,000
Clarenont 12,550 12,550 12,550 15,000
Clairevi lIe 375,100 260,000 115, 100 115,100 335, 100 249,000
Cold Creek 227,950 90,000 137,950 137,950 191,000 74,000
Glen Haffy 157,650 47 , 200 110,450 110,450 137,800 43,000
Greenwood 194,800 50,100 144,700 144,700 165,300 43,000
Heart Lake 215,450 80,200 135,250 135,250 188,550 72,000
Humber Trails 7,650 7,650 7,650 4,000
Pal grave 19,950 12,000 7,950 7,950 18,450 9,000
Petticoat Creek 279,350 113,600 165,750 165,750 238,350 93,000
Woodbr idge 12,800 12,800 12,800 12,000
General 64,700 64,700 64,700 33,950
'lUl'AL 2,511,600 1,127.000 1,384,600 1,384,600 2,180,000 1,016,000
1983.08 24
.
Page VI-12
1984 BUDGET
DIVISION Conservation Land Management
RETAIL SALES
AREA GATE REVENUES PROGRAM REVENUES REVENUES TOTAL
$ $ $ S
Albion Hills 76,500 114,000 14,000 204,500
Boyd 95,000 6,000 4,000 105,000
Bruce' sHill 98,500 37,900 28,000 164,490
Claireville 71,000 182,000 7,000 260,000
Cold Creek 24,600 26,200 39,200 90,000
,
Glen Haffy 32,400 11,300 3,500 47,200
.
Greenwood 33,500 11,500 5,100 50,100
Heart Lake 63,500 9,500 7,200 80,200
Palgrave -- 12,000 -- 12,000
Petticoat Creek 72,000 37,100 4,500 113,600
TOTAL 567,000 447 500 112.500 1.127.000
1983.09 19
,
~
Page VI-13
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Conservation Land Management - Conservation Planning
PURPOSE
To provide technical advice to private landowners to promote sound land management programs
To carry our resource management planning activities for Authority lands and technical advice to agencies managing Authority
lands in urban areas.
1984 OBJECTIVES:
- To continue to provide technical advice for reforestation, farm tree and shrub plantings, woodlot management, pond
management and stream impr ovemen t to private and public landowners.
- To provide E.S.A. management technical advice to private and public landowners.
- To prepare resource management plans for Authority owned lands.
FUNDING
This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalites.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Services
& Wages Utilities & Rents TOTAL
$ 125,527 7,473 500 133,500
\
.
1983 09.19
Page VI-14
1984 BlDGET
DIVISION Conservation Land Management
progran Conservation Land Management - Conservation Planning
1984 BllDGET OOURCES (F FINAN;::ING 1983 BlDGET 1983 ACTUALS
A0'IVITY NET PROVI~IAL MUNICI.PAL
EXPENDITURES REVEJIDES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
fJ fJ $ $ $ $ $ $ $ $
Conservation
Planning 133,500 133,500 73,425 60,075 118,500
<
'lUl'AL 133,.500 133,500 73,425 60,075 118,500
1983.09 19
I
.
Page VI-15
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Conservation Land Management - Tree Planting/Forest Management
PURPOSE
To provide technical assistance to private landowners to promote sound water conservation programs.
To carry out resource management programs for Authority dlands and public landowners
1984 OBJECTIVES:
- To continue to provide reforestation, farm tree and shrub plantings.
- To increase revenues from plant propagation.
- To provide a program of E.S.A. management on private, public and Authority lands.
- To increase woodlot and forest. management activi ties on Authori ty lands.
FUNDING
This is a shared program, 55% of the funds being available fro~ the Province of Ontario and the balance being funded from the
general levy on all participating municipalities
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Services
& Wages utili ties r, Rents TOTAL
$ 232,500 46,070 47,930 326,500
1983.09 19
1984 I3l.DG:T Page VI-16
DIVISION: Conservation Land Management
progra:n Conservation Land Management - Tree Planting/Forest Management
.
1984 BUDGET OOURCES (F FINAN;::ING 1983 BtDGET 1983 ACTUALS
ACTIVITY NE'f PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVmUES EXPENDI TURES REVENUES
$ $ $ $ $ $ $ $ $ $
Plant Propagation 145,000 135,000 10,000 5,500 4,500 123,170 120,000 .
Reforestation 31,000 5,500 25,500 14,025 11,475 22,700 2,000
Farm Tree &
Shrub 15,000 15,000 17,900 10,000
Resource
Management 15 , 500 15 , 500 8,525 6,975 13 , 500
Forest
Management 95,000 10,000 85,000 46,750 . 38,250 57,318
E.S.A.
Management 25,000 25,000 13,750 11,250
Woodlot
Management 33,293
'lUl'AL 326,500 165,500 161,000 88,550 72,450 267,881 132,000
1983 08.25
Page VI-17
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Conservation Land Management - Soil Erosion/Sediment Control
PURPOSE
To provide technical assistance to private, public and Authority owned lands for sediment control.
1984 OB.IECTIVES
- To continue to carry out programs of stream improvement, fencing, tree and shrub plants in rural and urban areas for
off-stream and on-stream sediment control
.
FUNDING:
This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS Materials
Salaries Supplies & Services
& Wages Utilities & Rents TOTAL
$ 19,500 18,500 10,500 48,500
1983 09 19
Page VI-18
1984 BI.IJrnT
.
DIVISION Conservation Land Managenent
Program Conservation Land Managenent - soil Erosion/Sediment Control
I 1984 BUDGET OOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REvrntJES EXPENDITURES REVENUES
$ $ ~ ~ ~ ~ ~ ~ -~ ~
Stream
Improvenent 25 , 000 25,000 13,750 11 , 250 20,000 2,000
Urban
Managenent 23,500 23,500 12,925 10,575 21,300
.
'lUl' AL 48,500 48,500 26,675 21,825 41 , 300 2,000
1983 09.19
Page VI-19
1984 BUDGET
DIVISION Conservation Land Management
PROGRAM Conservation Land Management - Fish/Wildlife Management
PURPOSE
To carry out a program of fish rearing and stocking for selected Authority Conservation Areas and Forest and Wildlife Areas
To carry out a program of fish management and wildlife habitat improvement for private and public landowners and on Authority
lands.
1984 OBJECTIVES
- To produce approximately 45,000 rainbow trout .
- To continue fish management projects on cold water streams following priority lists
- To carry out trree and shrub plantings on Authority lands in rural and urban areas of the watershed.
FUNDING
This is a shared program, 50\ of the funds being available from the Province of ontario and the balance being funded from the
general levy on all participating municipalities
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services
& Wages utilities & Rents TOTAL
(; 8,500 17,500 5,000 31,000
1983 09 19
.
.
1984 BlDGET Page VI-20
DIVISION Conservation Land Managanent
progran: Conservation Land Managanent - Fish/Wildlife Managanent
1984 BUDGET OOURCES OF FINAOCING 1983 BWGET 1983 ACWALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVmUES EXPENDITURES rnANT LEVY arHER EXPENDITURES REVmUES EXPENDI TURES REVENUES
$ $ $ $ $ $ $ $ $ $
Glen Haffy -
Fish Rearing 11 , 000 11 ,000 5,500 5,500 10,500
Fish Managenent 5,000 5,000 2,500 2,500
wildlife Habitat
Improvenent 15,000 15 , 000 7, 500 7,500
'lUl' AL 31,000 31,000 15,500 15,500 10,500
1983.09 19
Page VII-l
1984 BUDGET
THE INFORMATION AND EDUCATION DIVISION
This Division is responsible for the Community Relations program of the Au thori ty.
Conservation Information functions include
- the implementation of the general information programs, including the
provision of both internal and external communications:
- information on resource management programs: and
- planning, market research, information and medIa contact.
I
Conservation Education functions include
.
- conservation field centres:
- various heritage, conservation and interpretive programs: and
- the Kortright Centre for Conservation
.
1983 09 19
1984 BmGET Page VIl-2
CONSERVATION INFO~TION
1983 Achievements
_ Provided, at an increased level of service (as a result of the Canada ontario Dnployment Developnent Program - C.O.E.D.), a COnservation Information
Progran for Authority nenbers and staff, the general public and special interest and camnmity groups
_ Provided, through market analysis, a communications progran for the Authority's public use facilities, completed a Summer Visitors' survey report:
implemented the 1983 Marketing Plan for the COnservation Areas, Black Creek Pioneer village and the Kortright Centre for COnservation
_ provided information on the Authority's resource management programs: tours of the various watersheds.
- Developed the 1984 Marketing Plan. ..
1984 Priorities
_ To provide in 1984 a satisfactory level of service in the COnservation Information Program.
_ To review and revise the communications program for the Authority's public use facilities, as required by the results of the 1983 Visitors' Survey:
implement the 1984 Marketing plan.
_ To increase the level of information, through seminars and technical bulletins, on the Authority's resource management programs.
CONSERVATION EDOCATION
1983 Achievements
_ MaIntaIned the number of residential opportunities at the four residential field centres and day-use opportunities at COld Creek Conservation Field
Centre, Black Creek pioneer village and Bruce's Mill.
_ Increased visitation to Kortright Centre for COnservation to 90,000
_ Co-operated with York and G.1elph Universities and the Canada Centre for Inland waters in envirorrnental research at Lake St. George
_ Provided opportunities for special groups at the residential field centres (March of Dimes, York University, Archaeology Program).
_ Further developed thane prograns for the Kortright Centre in Fish & Wildlife, Forestry and water: canpleted the first phase of the Renewable Energy
Theme Program.
_ Made substantial progress on the major maintenance at the Albion Hills, Clarenont and Cold Creek Field Centre and at the Kortright Centre for
COnservation as well as at Lake st. George (as a result of the C.O.E.D Program)
1984 Priori ties
_ To maIntaIn the number of residential and day-use opportunities.
_ To accamodate 10,000 additional visitors at the Kortright Centre for Conservation.
_ To continue the development of audio-v~suals, exhibits and demonstrations at the Kortright Centre for COnservation.
_ To maintain the present level of volunteer staff at Black Creek pioneer Village, to reduce staff costs and increase funds available for operations and
maintenance.
_ To continue to provide General Interpretive Programs at program cost.
_ To continue major maintenance at Albion Hills, COld Creek, Clarenont Field Centres and the Kortright Centre for COnservation: to establish a major
maintenance fund
_ To canp1ete construction and cannence operations at the Etobicoke Envirormental Centre, in co-operation with the Etobicoke Board of El:1ucation
1983 09 19
,
.
\
.
Page ~k}_
1984 BUDGET
DIVISION: Information & Education
-------------------
------ -- - ------------------ --------------
1984 BUDGET OOURCES OF FINAOCI~ 1983 BlDGET 1983 ACTUALS
PROGRAM -- --- --NET PROVIOCIAL -"t.fuNICWA1-- ------ ------ --- ------- -------
EXPmDI'l'URFS REVENUES EXPENDI'l'URFS GRAN!' LEVY OTHER EXPENDI'l'URFS REVENUES EXPENDITURES REVENUES
----- ---r --,.-- ---~-- --""T--- --$--- -"$-- ------$-- --~- ---$-- ----$--
!,~ram...~i.!1..:..
General 330,130 330,130 165,065 165,065 300,420
Inform. Suppor t 65,475 65,475 32,738 32,737 64,842
Education SUpp 35,982 35,982 17,991 17,991 35,108
Data Processing 15,000 15,000 7,500 7,500 15,000
44~,58~ ~~J~87 ~}}J}9~ ~23,29~ Il:?J 370
CamlUn i ty
Relations Inform.
.. GeneraC---- 84,127 84, 127 45,270 38,857 80,127
Resource fi]t 11,000 11,000 6,050 4,950 11,000
Planning/Market
Analysis 94,743 94,743 94,743 90,243
Carmun i ty
Relations Educ
- supv-:ops-"& Mtce. 1,261,560 1,119,500 142,060 60,060 82,000 1,273,083 1,136,300
Supv Ops & Mtce.
Kortright 478,600 286,500 192,100 20,400 137,500 34,200 442,000 264,850
Developnent 191,000 191,000 50 ,000 50,000 91,000 114,800
------ -- -- -------- --------- --------- -------- ----------- ------- ----------- ------~
TOTAL 2,~67 ,617 1,406.tEOO ~.!.t~..!-2.. __J.!l..?J 07.!.__ ___ 63].J}J}___ ..!-_~J 20E_ __}JJ}6 , 6~~__ lJ 40..!-J_l:?0 --------- ------..
-----------
1983 09.19
.
Page VII-4
1984 BUDGET
DIVISION: Information & Education
PROGRAM program Administration
PURPOSE:
To provide an administrative, supervisory and support service staff to implement a comprehensive information, community and
staff relations and outdoor and conservation education program.
1984 OBJECTIVES:
- To continue the programs carried out in 1983 at the same level of service.
FUNDING
This is a shared program, 50% of the funds from the Province of ontario and 50% from the general municipal levy.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS
Salaries Services
Ii Wages & Rents TOTAL
$ 253,731 192,856 446,587
1983.09.19
\
1984 BlDGET Page VII-5
I
DIVISION: information and Education
Program Program Administration
1984 BUDGET OOURCES OF FINAN;::ING 1983 BlIJGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES 'EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
.
-
General
Salaries 151,574 151,574 75,787 75,787 142,966
Expenses 6,760 6,760 3,380 3,380 4,800
Benefits. 151;796 151,796 75,898 75,898 124,237
Severance ,
Vacation, Sick &
Statutory Pay 20,000 20,000 10,000 10,000 28,417
330,130 330,130 165,065 165,065 300,420
CCrmnBl i ty
Relations Inform
Support:
Salaries 61,975 61,975 30,988 30,987 61,142
Expenses 3,500 3,500 1,750 1,750 3,700
65,475 65,475 32,738 32,737 64,482
CaTI1ltIl1 it y
Relations Educ.
Support:
Salaries 34,182 34,182 17,091 17 ,091 33,908
Expenses 1,800 1,800 900 900 1,200
35,982 35,982 17 ,991 17 , 991 35, 108
Data Processing 15,000 15 ,000 7,500 7,500 15,000
'lUl'AL 446,587 446,587 223,294 223,293 415,370
· Benefits - include benefits for all full-time, contract and part-time anployees of the Information and Education Division
1983 09 .19
Page VII-6
1984 BUDGET
DIVISION Information and Education
PROGRAM Community Relations - Information - General
PURPOSE
To provide brochures, still and motion picture photographic materials, exhibits and special functions to implement the
internal and external general information program of the Authority.
1984 OBJECTIVES:
- To provide the materials necessaty to implement a satisfactory communications program in 1984.
FUNDING
This is a shared program, 55% of the funds being available from the Province of Ontario and 45% being funded from the general
levy on all participating municipalities for pub~ications and printing, photographic materials, tours and special days,
applicable to Water and Related Land Management progr~ms; and financed on a 50% Province of ontario grant and 50% general levy
for all Conservation and Land Management programs.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS:
Materials
Supplies & Services
Utilities & Rents TOTAL
$ 59,400 24,727 84,127
10983 09.19
\
1984 BtDGET Page VII-7
DIVISION: Information and Education
ProgrClll: Community Relations - Information - General ~
1984 BUDGET OOURCES OF FINAOCING 1983 BUJGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVmUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
l? l? $ l? l? l? $ l? l? l?
Publications &
Printing 52,827 52,827 29,055 23,772 51,827
Photographic 1,700 1,700 935 765 1,700
Tours & Special
Days 9,600 9,600 5,280 4,320 8,600
Motion Picture
Prog r CIll 8,000 8,000 4,000 4,000 8,000
Exhibits 10 ,000 10,000 5,000 5,000 8,000
,
pranotional
Contingency 2,000 2,000 1,000 1,000 2,000
'lUl'AL 84,127 84,127 45,270 38,857 80,127
I
-
1983 09.19
Page VIl-8
1984 BUDGET
DIVISION: Information and Education
PROGRAM Community Relations - Information - Resource Management Programs
PURPOSE:
To provide information to the general public and specific audiences with respect to Authority Resource Management Programs.
1984 OBJECTIVES:
- To increase the number of technical/semi-technical bulletins published
- To arrange for resource management tours and seminars.
FUNDING
This is a shared program, 55% of the funds being available from the Province of Ontario and 45% being funde~ from the general
levy on all participating municiaplities.
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS:
Materials
Supplies & Services
utili ties & Rents TOTAL
$ 9,500 1,500 11,000
.
1983.09.19
.. Page VII-9
1984 BlDGET
DIVISION: Information and Education
progrcrn Ccmnunity Relations - Information - Resource Managanent Prograns
1984 BUDGET roIJRCES <F FlNAlCING 1983 BUDGET 1983 ACTUALS
ACfIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ $ $ . $ $ $ $ $ $
Watershed Plan
Projects
presentations
and seni-
technical
publications
re Watershed
Program 11 ,000 11 ,000 6,050 4,950 11,000
,
.
'lUl'AL 11 ,000 11,000 6,050 4,950, 11 , 000
1983.09.19 ..
.
Page VII-10
1984 BUDGET
DIVtSION Information and Education
PROGRAM Community Relations - Information - Planning/Marketing Analysis
PURPOSE
To provide an effective communications program to maintain or increase visitation to Authority public use facilities
1984 OBJECTIVES
- To review and revise the communications program for the Conservation Areas, Black Creek Pioneer village and the Kortright
Centre for Conservation, based on the results of the 1983 surveys and marketing studies
- To implement a comprehensive marketing program.
FUNDING
Funding is provided by municipal levy on all participating municipalities
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services
& Wages Uti 11 ties & Rents TOTAL
--
$ 38,500 5,000 51,243 94,743
1983 09 19 0
1984 BtIlGET page VII-ll
DIVISION Information and Education
progran Oammunity Relations - Infonnation - Planning/Marketing Analysis
1984 BUDGET OOURCES OF FINAOCING 1983 BrnGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY O'mER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
Support 38,500 38,500 .. 38 , 500 34,000
supplies 24 , 500 24,500 24,500 24,500
pranotion and
Advertising 31,743 31,743 31,743 31,743
--------- -- -
'lUl'AL 94_r 743 94,743 __ __JJ-I! 43 _--2E,243 -- -------
1983 09.19
,
. .
Page Yl I-l~
1984 BUDGET
DIVISION: Information and Education
PROGRI\M Communi~ Relations - Conservation Education - SU2~~YJ~J~~~~ra~J~~~~ai~tenance
PURPOSE:
---
To proviae an outdoor conservation education program for school students and other community groups at four (4) residential
conservation field centres and a variety of outdoor and conservation education opportunities for the general public and school
groups at Cold Creek, Bruce's Hill and Black Creek.
1984 OBJECTIVES:
- To continue the program at the same level of services as in 1983
- To provide an outdoor and conservation education program for the following estimated number of students and adults:
Conservation Field Centres 13,500 (Residential)
Cold Creek, Black Creek & General Interpretive Programs 78,000
- To continue the major maintenance program at I\lbion Hills, Cold Creek and Claremont Field Centres
\
FUNDING
-----~-
Program revenues and the general levy on all participating municipalities. A surplus or deficit on the operations of the Boyd
and Lake St. George Conservation Field Centres will, by agreement, be charged or credited to the participating Boards of
Education. The cost of supervisory staff at Albion Hills, Boyd, Lake st George and Claremont is funded by a 55% grant from
the Province of Ontario, 45% being funded from the general levy on all participating municipalities
FINANCIAL COMMENTS:
OBJECTIVE CLI\SSIFICATIONS: Materials
Salaries Supplies & Services
& Wages Utilities ~~"'!p'me~_t: & Rents TOTAL
----~-- ---~-
$ 665,100 115,800 34,960 445,700 1,261,560
1983.09.19
.
1984 BlDGET Page ~I-13
DIVISION: Information and Education
Frog r CIIl O:mnunity Relations - Conservation Education - Supervision, Operations and Maintenance
------
1984 BUDGET OOURCES OF FINAOCIOO 1983 BlDGET 1983 ACTUALS
ACTIVITY NET - PROVIOCIAL MUNICIPAL ---- -
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY EXPENDITURES REVENUES EXPENDITURES REVENUES
$ --- ~-- $ -r -- - $ - ~---- ""T---
ProgrClll
Supervision 109,200 109 , 200 60,060 49,140 106,909
Boyd C.F.C. 217,000 217,000 228,000 228,000
Lake st. George 398,500 398,500 443,000 443,000
Albion Hills 221,500 221,500 203,000 203,000
Claremont 219,500 219,500 207,000 207,000
Cold Creek F.C. 3B ,000 3B ,000 37,300 37 , 300
Gen. Interpreti ve 25,000 25,OQO 18,000 18,000
B.C P V
(Tours & PLP) * * 142,674 * 148,750 * (6,076) * 157,500 * 163,500
Major Mtce
Albion 32,860 32,860 32,860 29,874
- - -- ---- ---~- -----
'lUl'1\L '-_ 1,261,560 1,119,500_ l42,.!l~.!l_ _-y0,060 _ _ 82,000__ _1, 273,.!l.!l}_ 1,1}6,300 ----- -------
-------~ ---
* These amounts are included in the ~istorical sites Division Budget, and do not add to totals here.
1983.09.19
..
Page YJJ -14
1984 BUDGET
DIVISION Information and Education
PROGR^M: Community Relations - Conservation Education - Supervision, Operations and Maintenance - Kortri~~
PURPOSE
To provide a conservation education program for the public, school and other community groups at the Kortright Centre for
Conservation
1984 OBJECTIVES:
- To provide program opportunities for 10,000 visitors over 1983 level, bringing visitation to approximately 90,000
FUNDING
--------
Direct program costs are funded from fees, revenues for services, food and sale of merchandise. Basic operations are funded
by a Ministry of Natural Resources grant of 55% on the Supervisor's salary, an M.T.R.C F. grant of $7,000 from the Growth
Endowment Fund, with the remainder from the general levy on all participating municipalities
FINANCIAL COMMENTS:
----~--------~-
~
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services Financial
& Wages Utili ties ~-~~~~ & Rents Taxes Expenses TOTAL
------ -----~-
$ 297,275 133,475 1,050 46,800 478,600
1983 09 19
.
1984 BlDGET Page VII-15
DIVISION: Information and Education
-----.-_-
Program Community Relations - Conservation Education - Supervision, Operations and Maintenance - Kortright
--
.
1984 BUIXET rotJRCES OF FINAOCING 1983 BUDGET 1983 ACTUALS
1\CTIVI TY - NET PROVIOCIM.--- ='"Mi.JNICIPAL - - -----
EXPENDI TIIRES REVEl'ruES EXPENDITURES GRANT LEVY Ol'HER EXPENDITURES REvmtJES EXPENDITURES REVENUES
~ ,..- ~ :;; -~ $ ~ -r --r--
Basic Operations 160,600 160,600 20,400 106,000 34 , 200 142,000
Programs -
General 318,000 286,500 31,500 31,500 300,000 264,850
----- ------ --- -----~
'lUl' AL 478,600 286,500 192,100 20,400 , 137,500 1!t 200 _ _~~2,000 26_4..t.!l..?~ t.....
------ '-----,-------- -- -----~-
1983 09.19
Page YJJ.:}~
1984 BUDGET
DIVISION: Information and Education
PROGRAM commun~ Relations - Conservation Education - Develoeme~~
PURPOSE:
---
To develop the facilities required for the Authority's outdoor and conservation education programs.
1984 OBJECTIVES
.
- To continue development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation
- To develop additional indoor exhibits, furnishings and equipment for the Kortright Centre for Conservation
_ To develop the maintenance and service program for the Etobicoke Environmental Centre as per the Etobicoke/Authority
Agreemen t.
FUNDING:
---
FINANCIAL COMMENTS:
OBJECTIVE CLASSIFICATIONS Materials
---~-- Salaries Supplies & Services
Ii< Wages utilities ~~~_t: & Rents TOTAL
-----
$ 105,000 63,400 16,000 6,600 191,000
1983.09.19 ,
Page yg-17
1984 BlDGET
DIVISION Information and Education
Program: aammunity Relations - Conservation Education - Development
- ---
1984 BUDGET OOURCES OF FINAOCIOO 1983 BUDGET 1983 ACTUALS ___
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES ~XP.ENDITURES GRAN!' LEVY OTHER EXPENDITURES REVrnUES EXPENDITURES REVENUES
~ ~ --r ~- ~ -----r- ---~- ---~-- ---r--
Kortdght
Developnent 100,000 100,000 50,000 50,000 100,000
Albion Hills 91,000 91,000 91,000 14,800
-
-------- ---~ ---- ---
'lUl'AL 191,000 -- ~- 191,000 50,000 __L-___~E.!.!lOO Jl,OOE __..!}.~ ,800 ----~
1983.09.19
..
Page Y.!lI-l
,
.
1984 BUDGET
THE HISTORICAL SITES DIVISION
This Division is responsible for the Heritage Conservation program, including the development and
administration of the Black Creek pioneer Village, Albion House, historical markers and other historical
buildings coming under the jurisdiction of the Authority
1983 09 19
page VII 1-2
1984 BUDGET
1983 ACHIEVEMENTS
- Operated an increased number of buildings at Black Creek Pioneer Village with interpretive staff drawn from own staff and
C.O.E.D. Program..
- Maintained village ground~, gardens, Peacock Woods and Head Office grounds with own staff and staff on C.O.E D. program,
plus assistance from volunteers (Mimico program) .
- Expanded and improved special events programming.
- Established and filled position nf Promotions Officer to serve Village interests
- Participated in Telidon network and brochure displays and excbange.
- Secured funding to permit erection of Visitors Centre.
.
1984 PRIORITIES
- To establish Visitors Centre and ensure its profitable operation as soon as possible
- To expand Promotions Officer activities to increase attendance at Village.
- To further refine special events and programming
- To continue to have maximum number of buildings staffed and open to public
- To continue to develop staff skills in interpretation and conservation techniques
- To control costs and ensure most effective use of available funds.
1983.09 19
.
Page VIII-3
1984 BlDGET
DIVISION Historical Sites
"
1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS
PROGRAM NET PROVINCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANl' LEVY OTHER EXPENDITURES REVENUES EXPElIDITURES REVENUES
$ $ $ $ $ $ $ $ $ $
Program
Administration 239,800 239,800 119,900 119,900 273,122
Operations &
Maintenance 1,851,200 1,009,500 841,700 631,700 210,000 1,487,200 1,025,000
Conservation
Education -
Supervision 142,674 148,750 (6,076) (6,076) 157,500 163,500
Capital
Developnent 1,868,000 1,868,000 1,868,000 1,995,000
Visitors Centre 67,500 42,700 24,800 24,800
-
'lUl'AL 4,169,174 1,200,950 2,968,224 119,900 770,324 2,078,000 3,912,822 1,188,500
-
I
1983 09 19 .
..
Page YIII-4
1984 BUDGET
DIVISION Historical Sites
PROGRAM: Administration
PURPOSE
To provide supervisory and support services to implement the heritage conservation program.
1984 OBJECTIVES
- To provide the support services at the same level as in 1983.
FUNDING
This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the
general levy on all participating municipalities.
.
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS
Salaries Services
& Wages & Rents TOTAL
---..
$ 233,800 6,000 239,800
1983.09 19
page VIII-2
1984 BtDGET
DIVISION Historical Si tes
Program: Administration
1984 BUlXiET SOURCES OF_ FINAOCING__ 1983 BWGET 1983 ACTUALS
ACTIVITY NET PROVINCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES ~
$ $ I? $ $ $ $ $ $ $
Salaries 47,100 47,100 23,550 . 23,550 45,000
Benefits 186,700 186,700 93,350 93,350 139,686
Travel 6,000 6,000 3,000 3,000 5,000
Vacation, sick &
Statutory
Holiday Pay * 83,436
-- - -- --- ---
'lUl'AL 239,800 239,800 119,900 _ 119, 9EE-- ____ __ 273,1~~ -- - -----
--- - - * In 1984, this line item is included with Black Creek Pioneer Village Operations and Maintenance - Supervision
1983 09 19 ..
Page VI1J:-6
1984 BUDGET
DIVISION: Historical Sites
!'~2.9RAM__.Qp~ratio~2nd Maintenance.::_ Black Creek pioneer village
PURPOSE:
----
To prov~de a living portrayal of a crossroads village in pre-Confederation Ontario
198.!.. OBJECTIVES
- To continue to provide an ~ducational, recreational experience for visitors to the Village.
- To increase attendance (by Promotions Officer and by Visitors Centre and improved programming) by 20,000 more than 1982
actual.
- Increase visitor spending in food and material purchases by improved service and facilities.
- To ensure most cost effective operation of village
- Provide and encourage staff development and training in all aspects of museum (Village) operation and conservation
Techniques.
FUNDING ..
----
72% of the funding comes from admission receipts, sales outlets and other village operations.
The remainder comes from municipal levy (15 3%) and balance by grant from the Ontario Ministry of Citizenship and Culture
FINANCIAL COMMENTS:
-----------
Use of the C 0 E D. program in 1983 operations provided approximately $215,000 to permit the full staffing of all buildings
and the opening of many that would otherwise have remained closed, notably Doctors House, Flynn House, Dominion Carriage Works
and Sawyers House This accounts for the bulk of the additional levy money requested for 1984 to keep all buildings opened.
If these funds are forthcoming from an alternative source, similar to C.O ED, the request for levy money would drop by a
11 ke amoun t Failing funds from either source, the Village would contain seven closed buildings and reduced staff in several
of those open.
OB JES.1'l VE-SLASS lXl CA T I O.!!L Materials
Salaries Supplies & Services
~!lages _ Utili ties & Rents TOTAL
-~--_. --------.
$ 1,413,300 371,400 66,500 1,851,200
1983.09 28
1984 BUDGET page VII.!:"2.
DIVISION: Historical Sites
Program: Operations and Maintenance - Black Creek pioneer village
1984 BUDrnT SOURCES OF FINAN;:: IN(; 1983 BlDGET 1983 llCTUALS
ACTIVITY NET - PROVIOCIAL MUNICIPAL ---
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEV!_ OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
$ ~ ~ $ r ~--- ~ ~ H$ ~
Supervision 586,800 5,000 581,800 581,800 505,100 3,000
Costtme Dept. 24,100 1,000 23,100 23, 100 23,500 1,000
Registrar 35,100 2,000 33,100 33, 100 34,500 2,000
Gatehouse 29,700 485,000 (455,300) (455,300) 24,500 505,000
Giftshop-Entrance 157,000 220,000 (63,000) (63,000) 130,200 205,000
Giftshop-Museum 31,300 36 , 500 (5,200) (5,200) 32,500 45,000
WEDdings 10,100 20,000 (9,900) (9,900) 8,800 20,000
Special Events 40,000 10,000 30,000 30,000 40,000 6,000
Livestock 103,700 3,000 100,700 100,700 97,000 4,000
Carpenter Shop 21,700 500 21,200 21,200 20,000 500
Peacock WOOds 10,000 ~O ,000 10,000 6,000
Food Operation 34,500 (34,500) (34,500) 14 ,000 55,000
Non-Designated
Areas 60 , 100 60,100 40,100 20,000 41,000
Sleigh Rides 500 2,000 (1,500) (1,500) 500 3,000
Buildi~Activit. 741.100 190.000 551,100 371 , 100 180,000 509.600 175,500 -- f-------
TOTAL 1.851.200 1,009.500 841,700 ----. 631,700 210 000 1,48] ,200 1,025,000 --- 1------
1983 09 19
.
.
,
Page VI...!]..::.!!.
1984 BUDGET
DIVISION Historical sites
PROGRAM Edu~ation Program
PURPOSE
To provide conservation education opportunities for school groups by group tours and by a pioneer Life program
1984 OBJECTIVES
To maintain existing levels of service for 60,000 students combined in both Tour and Pioneer Life Programs.
FUNDING
----
The program is planned to be self-Sustaining
,
FINANCIAL COMMENTS
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Services
& Wages utili ties & Rents TOTAL
---_. ------
pioneer Life Program $ 41,394 9,550 60,294
Educational Tours $ 72,650 7,200 82,380
1983.09 19
1984 Bl.IaT Page VI 11-9
DIVISION: Historical Sites
Program: Etlucation Progrcm
--
1984 BUDGET SOURCES OF FINAOCING 1983 BlDGET 1983 ACTUALS
ACTIVITY NET -- -POOVIOCIAL MUNICIPAL -- -----
-- EXPENDITURES REVrnUES EXPENDITURES GRAN!' LEVY OTHER __ ...!..~ENDITURES REVENUES EXPENDI'lURES ~VE;NUEE-.
$ $ $ $ --s- ~ ---r $ ---r--- $
pioneer Life
Program 60,294 44,625 15,669 15,669 61,400 44,500
Educational
Tours 82,380 104,125 (21,745) (21,745) 96 , 100 119,000
,
----- ---- ---- ~----
'lUl'AL 142,674 148,750 (6,076) __~76L -- 157.!~00 163,500 -- 1..-____
1983 09 19
.
Page VI 11:10
1984 BUDGET
DIVISION Historical Sites
-------------------
PROGRAM Capital Development
!'J1~~
To carry out restoration and development work at the Black Creek pioneer Village in accordance with approved plans.
1984 OBJECTIVES
---------
- To complete construction of Visitors Centre and open for full use.
- To complete construction of Nesbitt Sawmill.
- To finish internal and landscaping requirements of
- Richmond Hill Manse
- Sawyer's House
- Masonic Temple/Hardware Store
FUNDING
-------
Funding to be provided by provincial aid (Wintario, Lottario), member municipalities and by The Metropolitan Toronto and
Region Conservation Foundation.
FINANCIAL COMMENTS
----------
OBJECTIVE CLASSIFICATIONS Materials
------------- Supplies &
Utili ties TOTAL
---
$ 1,868,000 1,868,000
1983.09.28 .
I
.
1984 BlDGET Page ~II-ll,.
DIVISION: Hi.st.9}ical Si tes
Progrilll Capital Development
-- - --
1984 BUlXiET SOURCES OF FINAN: 100 1983 BlDGET 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL ----
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
---- ~ ~ ~ -- $ $ $ $ $ -r- $--
Nesbitt Sawmill 50,000 50,000 50,000 85,000
Visitor Centre 1,800,000 1,800,000 1,800,000 1,800,000
Tinsmith 3,000 3,000 3,000 75,000
Rictmond Hill
Manse 10 ,000 10,000 10,000
35,000
Sawyer's House 5,000 5,000 5,000
------ -- - ---- --- -----
'lUl' AL 1,868,000 1,868,000 -- ~_8,E.QQ __!tJJ~, 00.!l ---
---------------- - ------
1983 09 19
Page YI I 1:12
1984 BUDGET
DIVISION Historical Sites
----------------------------
PR2GRAM__ Vi.:;i tor.:;_ Cent.!~..:....~Etion~Ji~ainten2~
PURPOSE
---
1984 OBJECTIVES
--------
To operate efficiently the Centre for at least two months (November, December) of the year
.
FUNDING
---
Funding is available from municipal levy until such time as the Centre become self-sustaining.
~l~.!--SOMM~~
9~i1~S1'IV~ CLASllIFICA1'10NS Materials
Salaries Supplies & Real Services Financial
~.!lages utili ties ~J.pE1ent P r ..9.P~.E!.Y. & Rents Taxes !l]Cj>~~.!I- TOTAL
------ -~---
$
1983 09.28
Page Y.!ll: 13
1984 BUDGET
DIVISION Historical Sites
Program: Visitors Centre
- -- - - -
1984 BUDGET SOURCES OF FINAOCING 1983 _!3-lDG:T 1983 ACTUALS
ACTIVITY NET PROVIOCIAL MUNICIPAL
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EE'ENDITURES REVENUES EXPENDITURES REVENUES
------ $ ~ ~ ---~ ~ $ $ $ $ $
.
Visitors Centre 67,500 42,700 24,800 24,800
\
-- - --- ----- 1--------- --- 1------
'lUl'AL 67,500 42,700 24,800 _________ ~.24 ,8.!l0__ ---- L-.-___~
- --- -------
1983.09.19
\
,
.
Page 1~-1
1984 BUDGET
.
VEHICLE AND EQUIPMENT FUNDS
Based on the principles of fund accounting, the Authority administers the Vehicle and Equipment Fund and Food Service
Equipment Fund
YEHICLE_~~R EQUIPMENT FUND
The fund provides for the acquisition of replacement vehicles and equipment required to support various operating and
maintenance activities. The fund is replenished by charges to operating and maintenance budgets. The level of recoveries is
approved by the Ministry of Natural Resources and is intended to provide for the recapture of the original cost as well as for
daily operating expenses.
!OO~2~~Y1S~ EQUIPMENT FUND
The fund provides for the acquisition of new and replacement capital equipment required for the operation of food facilities,
in accordance with policy adopted by the Authority in 1983 The fund is replenished by recoveries from the food service
operating budget.
1983.09 19
.
Page IX-2
1984 BUDGET
VEH ICLE AND~..Q!l I P~.!IT FUND~
PURPOSE
To sustain the Authority's vehicles and equipment and food service equipment complement at adequate levels to assure economy,
efficiency and productivity in various programs.
1984 OBJECTIVES:
To acquire the following
Division/progra~ Vehicle Re~lacem~nt New EqU~pme~ Replacement ~i-Ement
--T -
Water Resource 48,000 1,200 111,575
Conservation Land Management 102,800 2,350
Information and Education 11,000
Food Services --- 40,000
----.
150,800 14,550 151,575
==7===== ------ ------- .
------ -------
FUNDING
--
Replacement vehicles and equipment are funded via recoveries (based on use) from operating divisions and include provincial
grant and municipal levies as applicable through the Vehicle & Equipment Fund. New equipment and vehicles (excluding Food
Service equipment) are funded from municipal levy.
FINANCIAL COMMENTS
--------
No recovery is available from the Ministry of Natural Resources for Food Service Equipment. It is necessary to derive funds
for Food Service Equipment from the Food Service operating revenue
1983.09.19
.
Page JX-}_
1984 BlIXET
VEHlfLE ~ muIfMENT_~_
------ ----------------------- ----------- ----------------------
1984 Bt.lIXET rouRCES (F FINAOCING 1983 BUDGET __~.!lL~.Q'UALS______
- ----- - -- MUNICIPAL - --- ------ ------
ACTIVITY NET PROVIOCIAL
EXPENDITURES REVENUES EXPENDITURES GRAN!' LEVY OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
- ,.-- "T- ---r- ---~-- ---~---- $--- --~ r-- ----~---- ----~-
Vehicles - New
- Replacanent 150,800 150,800 150,800 67,000
Equipnent - New 14,550 14,550 14,550 13,600
- Replacanent 111,575 111,575 111,575 150,130
Food Services
Equipnent 40,000 40,000 40,000 50,000
,.
.
-------- --- -------- -------- ---------- -------- --------- ------ --------- --------
'lUl'1\L ~J92~_ _}16,J25_ ---------- ___..!-4,55.!l_ _}02J 375_ __2.!l.!lJ 73.!l__ ------ ------ --------
--------- ------
1983 09 19
.
Page ~:~
1984 BUDGET
FOOD SERVICE
-------------
Effective March 1, 1983, the Authority assumed total operational responsibility for the various food facilities at
Conservation Areas and at Black Creek pioneer Village. previously the huthority had been under management agreement with a
caterer for the operation of food facilities.
.
This section of the budget brings together the total food service program; net revenue is incorporated into the respective
divisional operating budgets.
.
1983.09.19
-
..
Page ~.l.
1984 BUDGET
FOOD SERVICE
-----
!'E..Q9~__.!-?-9d S~..!vice_.:~erations
PURPOSE:
To provide food services at the refreshment stands, Half Way House, Kortright Centre for Conservation, the Conservation Field
Centres, and for various Authority functions.
1984 OBJECTIVES
- To provide a high quality food service that is attractive to all visitors.
- To maximize net revenue from the food operation.
.
FUNDING
---
Operating expenditures are funded from revenues.
FIN~~l~_~ CO~N]'S:
The net revenues will be used to offset operating costs in the areas where the revenues are produced
OBJECTIVE CLASSIFICATIONS: Materials Contract
Salaries Supplies & Services Financial
& Wages Utili ties Maintenance & Rents Taxes EXJ>~..!l~~ TOTAL
------ ------ -----
$ 436,000 388,000 49,000 46,950 4,000 923,950
1983 09 19
1984 BlJDGET Page 1C:1.
FOOO SERVICE
Program Food Services* -----------
--------- ---------- ------------------------------------- ---------------------------
1984 BUDGET 1983 BUDGET 1983 ACTUALS
lICTIVI TY --- ------------ ------------- -------- ---------- ------- -----
EXPENDI~_ REVENUE NET REVENUE* EXPENDITURE REVENUE NET REVENUE* EXPENDITURE REVENUE NET REVENUE
$ c---r $"--- ---$"----- ----$-- ----$----- $ ----$-- --$"----
C.L.M. Division
Refreshnent stands and
Group Catering g5,.!l50 1J~J~OO l-JJ45O ~~.! 90.Q. ..!-~J.! OO.Q. ~l ,10.Q.
1. & E. Division
COnservation FIeld Centres 378,300 378,300 259,417 259,417
Kortright Centre -
Refreshment stand, Dining
Roan and Group Catering 49,500 51,000 1,500 46,000 56,000 10,000
~}1 ,.!l00 429 ,3E.Q. L5O~ }E~.!~ 17 }}.?.!Ji7.: io ,.!l00
H.S. Division
iialTWay House 231,150 256,800 25 ,650 259,000 290,000 31,000
Refreshment stand 79,950 88,800 8,850 103,000 113,000 10,000
31l,10~ ~~,-;m)" ?4."5n1! }.?}.!~ 3E}.!3JOO ~~
Authority Group Catering 10,000 10,000
------------------------- ---- ~---- ----- ---------- ----------- ---------- --------- ------------ ----------
TOTAL 923,950 JJ9 ,~.!l.!l__ __2~.!~~E-_ _ 83}.!}..!-!__ _JE.?.!~..!-L_ __J}Llil.!l__ ------- ------------
------------------------ ----------
* Net revenue has been incorporated into divisional operating budgets
1983.09.19
B-339
SCHEDULE OlE 01
EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
,
,
1984 ?ROGRAM
AS PROPOSED IN
PROJECT fOR EROSION CONTROL AND SLOPE STABILIZATION
IN METROPOLITAN TORONTO
1992 - 1984
..
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
AUGUST, 1983
,
B-340
EROSION CONTROL AND SLOPE STABILIZATION
IN METROPOLITAN TORONTO
1984 PROGRAM
INTRODUCTION
The purpose of this report is to outline the progress of the Erosion
Control and Slope Stabilization Project for Metropolitan Toronto; which
is designed to carry out the following
(a) Major erosion control and slope stabilization remedial works conducted
on a priority basis for watersheds draining in excess of 1,300
hectares,
In view of the large number of sites requiring erosion control and bank
stabilization work throughout Metropolitan Toronto, major remedial work
is undertaken on a priority basis Using the original priority ratings
listed in the MacLaren report of 1970 as a starting point, the rate
of progress and deterioration of these sites is assessed annually ands
ranked accordingly The priorities within this pool change continually in
responce to the dynamics of the erosion process at each site, and
therefore we strive to ameliorate the list with a steady ;nflux of
technical data on site conditions The current top priorities are
reflected in the work program for 1983 and the 'Pool of Priority Sites'
which are found in respective sections of this report The current
pool of priorities will be reviewed regularly during 1984 to accomodate
any significant changes and the possible inclusion of new sites
1984 is the third year of the 1982 - 1984 Project for Erosion Control
and Slope Stabilization in Metropolitan Toronto This project has
budgeted $402,000 00 for the 1984 program
8-341
PROGRESS REPORT
The following is a list at which major or minor remedial work was carried
out between the inbeption of Project W C.- 60 - 'Erosion Control and
Bank Stabilization in Metropolitan Toronto' in September, 1974, through
the 'Interim Water and Related Land Management Project 1977 - 1981'
and including the second year of the 1982 - 1984 Erosion Project.
LOCATION WATERSHED WORK YEAR
MAJOR REMEDIAL WORKS
90 Forestgrove Drive East Don River 1974
20-30 Islay Court Humber River 1974
39-41 Storer Drive Humber River 1974-1975
99-103 Burbank Drive Newtonbrook Ck 1974-1975
Hi Mount Drive Newtonbrook Ck' 1974-1975
8-10 King Maple Place Newtonbrook Ck 1974-1975
113 Burbank Drive Newtonbrook Ck 1975
14-22 Archway Crescent Humber River 1975
6 Wooden Heights Humber River 1975
45 Riverbank Drive and Vicinity Mimico Creek 1975
32-38 Bonnyview Drive Mimico Creek 1975-1976
37-ll3 Lakeland Drive West Humber 1976
Yvonne Public School Black Creek 1976
30-56 Grovetree Road West Humber 1976
95-97 Portico Drive East Branch 1976
Highland Ck
197-205 Sweeney Drive East Don River 1976
24 Stonegate Road Humber River 1976-1977
24-36 Westleigh Crescent Etobicoke Creek 1q76-1977
158-168 & 190-21~ Three Valleys Dr "East Don River 1976-1977
6-14 Sulkara Court East Don River 1978
Don Valley Drive Don River 1978
50-58 Stanwood Crescent Humber River 1978-1979
Enfie1d/Sunset/Jellicoe Vicinity Etobicoke Creek 1979
17-53 Riverview Heights Humber River 1979
10 Codeco Court - Phase I Don River 1980
35 Canyon A'fenue Don River 1979
31-39 Rivercove Drive Mimico Creek 1980
25-31 Alamosa Drive Don River 1980
Don Valley Parkway & Lawrence Don River 1980
10-14 Bruce Farm Drive Don River 1980-1981
39-47 Presley Avenue Don River 1980-1981
Grenview Boulevard Mimico Creek 1981
Rainbow Creek Parkway Development Don River 1981
9 & 11 Sulkara Court Don River 1981
Denison Road vicinity Humber River 1981
146-168 Humbervale Blvd & 835 Mimico Creek 1982
Royal York Road
45 & 55 Wynford Heights Crescent Don River 1982-1983
12-30 Beaucourt Road Mi:nico Creek 1983
Delroy Drive & Berl Ave Vicinity Mimico Creek Pro posed 1983
B-342
LOCATION WATERSHED WORK YEAR
MINOR REMEDIAL WORKS
520 Markham Road Vicinity Highland Creek 1975
(Cedarbrook Retirement Home)
8ij-89 Greenbrook Drive Black Creek 1975
Klrkbradden Road Mimico Creek 1975
West Hill Collegiate Highland Creek 1975
Shoreham Court Black Creek 1975
27-31 Ladysbridge Drive West Branch Highland 1975-1976
N.W. of 56 Grovetree Road West Humber River 1975-1976
37-ij3 Mayall Avenue Black Creek 1976
79 Clearview Heights Black Creek 1976
S W of Shoreham Drive Bridge Black Creek 1976
Driftwood Court Black Creek 1976
75 Decarie Circle Mimico Creek 1976
ij Woodhaven Heights Humber River 1977
73 Van Dusen Boulevard Mimico Creek 1977
Donalda Club (8th Fwy) Don Ri ver 1978
Westleigh Crescent Vicinity Etobicoke Creek 1978
Scarlett Woods Golf Club Humber River 1978
22-26 Dunning Crescent Etobicoke Creek 1978
Kennedy Road Shopping Mall Don River 1978
Sheppard and Leslie Nursery Don River 1978
Leslie Street at Sheppard Rouge River 1978
Meadowvale Road Rouge River 1978
Zoo (Z-15) Rouge River 1978
Orchard Crescent Mimic'o Creek 1978
Forest Valley Day Camp Don River 1978
Beechgrove Drive Highland Creek 1979
Restwell Crescent . Don River 1979
Deanewood Crescent Vicinity Mimico Creek 1979
Dawes Road - 2 Sites Don River 1979
Tywn Rivers Bridge Rouge River 1979
Glen Rouge Trailer Camp Rouge River 1979
Beechgrove Drive - II Highland Creek 1980
Jason and Riverdale Humber River 1980
Warden & St Clair - 2 sites Don Ri ver 1980
Zoo - II Rouge River 1980
Glendon College Don River 1980
Scarlett Road & Eglinton Humber River 1980
Wllket Creek Don Rher 1980
Glen Rouge Trailer Camp Rouge River 1980
Sunnybrook Park Don River 1981
Donalda Golf Club Don River 1981
Glendon College Don River 1981
Bonnyview Drive II Mimico Creek 1981
West Side of Markham Rd (West Branch) Highland Creek 1981
Alderbrook Drive Don RIver 1981
West Dean Park (2 Sites) Mimico Creek 1982
Royal York Road Mimico Creek 1982
Waulron Street Etobicoke Creek 1982
Colonel Danforth Park Highland Creek 1982
Upwood Greenbelt Vicinity Black Creek 1982
Summary Major Works - 39
Minor Works - 50
Total Expenditure - $5,038,000 00
8-343
1984 WORK PROGRAM
The following table lists the proposed work program for 1984 and the
respective budget analysis
ITEM ESTIMATED COST
"lajor Remedial I
Gwendolan Crescent 105,000 00
Major Remedial II
Raymore Drive & Vicinity 204,000 00
Major Remedial III
Moore-Vale Ravine 40,000 00
Major Remedial IV
14 Forest Path Court 42,000 00
Geotechnical Studies
Alder Road & Stanwood Cras t11,000 00
.. ..
TOTAL $402,000 00
nOTE Costs include expected revenue
lJl
POOL OF EROSION PRIOrtITY SITES 1984 - HETRO TORONTO I
w
"'-
TE-CIINICAl "'-
lOCATION WATERSHED MUNICIPALITY PRIOIlITY COMMENTS
100-104 Gwendolen Cres. West Don River North York 1 Problem: Slope failure and riverbank erosion
Structure Affected Three residences
Height of Bank 38m
Length of Bank 75m
99-113 Weir Cres. Highland Ck. Scarborough 2 · Problem Slope failure
Structures Affected: Nine residences and three pools
Height of Bank 35m
Length of Bank 150m
Raymore Dr., Riverstone Humber River Etobicoke 3 Problem: Slope failure and riverbank erosion
Dr , Vista Humber Dr. Structures Affected: Raymore Dr. and 14 properties
Height of Bank 12m
length of Bank 250m
Moore-Vale Park Don River Toronto 4 Problem Slope failure and riverbank erosion
Avenue Structures Affected: One Pede Bridge, one Pathway
Height of Bank 5m
Length of Bank 15m
14 Forest Path Court Humber River Etobicoke 5 Problem Slope failure and riverbank erosion
Creek Structures Affected One residence, one pool
Height of Bank 10m
Length of Bank 23m
178 Alder Road Don River East York 6 Problem: Slope failure
(Massey Ck ) Structures Affected: One Roadway
Height of Bank 20m
Length of Bank 100m
91 Forest Grove Dr. E. Don River North York 7 Problem: Slope failure and riverbank erosion
Structures Affected One residence
Height of Bank 22m
Length of Bank 40m
14-20 Stanwood Cres. Humber River Etobicoke 8 Problem Slope failure and riverbank erosion
. Structures Affected Four residences
Height of Bank 20m
Length of Bank 30m
I
,
POOL Of EROSION PRIORITY SITES (1984 - YORK Page 2
--- L ...", S';;';--- ------- TECHNICAL
LOCATION MUNICIPALITY PRIORITY COMMENTS
Rowntree Mills Park Humber River North York 9 Problem Major riverbank erosion
Structure Affected Park pathway and Parking lot
Height of Bank 10m
Length of Bank 115m
161 Riverside Drive Humber River Toronto 10 Problem Slope failure and riverbank erosion
Structure Affected Roadway
Height of Bank: 9m
Leng.th of Bank 33m
1025 Scarlett Road Humber River Etobicoke 11' Problem Riverbank erosion (shale bank)
Structure Affected One apartment, and garage
. Height of Bank: 15m
Leng th of Bank 35m
14 Neil son Dr N of Etobicoke Ck Etobicoke 12 Problem: Slope failure and riverbank erosion
Dundas St W Structure Affected One high-rise apartment, pool
Height of Bank: 17m
Leng th of Bank 20m
19 fairglen Cres Humber River North York & 13 Problem Slope failure and riverbank erosion
and Vicinity Bor of York Structure Affected One residence, one high-rise
i Height of Bank 7m
I Length of Bank 100m
48-50 Barkwin Dr Humber River Etobicoke 14 Problem Slope failure (fill material)
I Structure Affected: Two residences, Two pools
I Height of Bank: 25m
Length of Bank: 30m
Mouth of Highland Ck lIighland Ck Scarborough 15 I Pr.oblem Slope failure, riverbank erosion
Structure Affected CNR Tra1n Bridge
Hetght of Bank 15m
Length of Bank 20m
I
lJl
I
w
~
Ul
OJ
I
w
~
0\
,
POOL OF EROSION PRIORITY SITES 1984 - METRO TORONTO Page 3
..
~ TECHNICALI
LOCATION WATERSHED I MUNICIPALITY PRIORITY COMMENTS
1
i ,
Sewell Rd at Rouge River I Scarborough 16 : Problem Slope failure and riverbank erosion
Finch Avenue I Structure Affected roadway
! Height of Bank 18m
I Length of Bank 20m
Van Dusen Blvd Mimico Cr Etobicoke 17- I Problem Toe protection failure
I Structure Affected Two residences
I Height of Bank 2 5m
Leng th of Bank 30m
\
18 I Slope failure, riverbank erosion
Serena Gundy W Don River North York Problem
Park i Structure Affected one ped bridge, one pathway
Height of Bank 3m
Length of Bank 15m
Eccleston Dr E Don River North York 19 Problem Slope failure, riverbank erosion
I Structure Affected
Height of Bank 20m
Length of Bank 30m
I
92-94 Celeste Dr W Highland Scal'borough 20. i Problem Slope failure, riverbank erosion
Creek Structure Affected Two residences, one pool
Height of Bank 35m
. I I Length of Bank 32m
,
B-347
EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF PEEL
984 ?ROGRAM
AS PROPOSED IN
PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION
IN THE REGIONAL MUINICIPALITY OF PEEL
1982 - 1984
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
AUGUST, 1933
B-348
EROSION CONTROL AND SLOPE STABILIZATION
IN THE REGIONAL MUNICIPALITY OF PEEL
1984 PROGRAM
INTRODUCTION
Given the number of sites requiring erosion control and slope stabilization
work throughout the Region of Peel, major remedial work is undertaken on
a priority basis The original priority ratings listed in the Erosion
Inventory and Priorities Study of 1977 were used as a starting point in
assessing the rate of progress and deterioration of erosion sites A 'Pool
of Erosion Sites' was prepared from this study and is continually updated
with new sites experiencing erosion problems The technical priorities within
this pool are reviewed on a regular basis to reflect the dynamics of the
erosion process at each specific site
I
The annual work program which was formulated on a priority basis using
the 1984 'Pool 0, Erosion Sites', and the sites bearing high priority ratings
are listed in the respective sections of this report
It should be noted that in the Region of Peel, the municipal share of the
costs of erosion control program are passed on to the local municipalities
As a result, the erosion priority pool is divided to coincide with the three
local municipalities within the Region of Peel, namely the Town of Caledon,
the City of Brampton and the City of Mississauga and conseque~ly, the relativl
priorities are not given on a regional basis
1984 is the third year of the 1982 - 1984 Project for Erosion Control and
Slope Stabilization in the Regional Municipality of Peel The budget for
the 1984 Work Program is $18,000 00
.
.
8-349
PROGRESS REPORT
The following is a list of sites at which remedial work was carried
out from the inception of the Interim Water and Related Land Management
Project, 1919-1981 and for the first two years of the 1982 - 1984 Erosion
Project
LOCATION WATERSHED WORK YEAR
138 King Street Vicinity - Bolton Humber River 1919
(Town of Caledon)
Sherway Drive, Mississauga Etobicoke Creek 1919
Wildwood Park, Mississauga Mimico Creek 1919
Mill Street, 8rampton Etobicoke Creek 1980
Ponytail Drive & Steepbank Cres , Etobicoke Creek 1980-1981
(Vicinity, Mississauga)
10 Beamish, Wildfield, (Brampton) West Humber River 1980
(Lindsay Creek)
Centennial ~oad - Bolton Humber River 1981
(Caledon)
Legion Street near Derry Road Mimico Creek 1982
(Mississauga)
Charola1s Blvd , (Brampton) Etobicoke Creek 1982
Albert and John St (Bolton) Humber River Proposed 1983
93 Scott Street (Brampton) Etobicoke Creek Pro posed 1984
B-350
1984 WORK PROGRAM
The Regional Municipality of Peel
The following table lists the proposed work program for 1984 and the
respective budget analysis
ITEM ESTIMATED COST
i) Survey and Legal $2,000 00
ii) Major Remedial I
I 93 Scott Street, Brampton 16,000 00 .
I .
I
I
I TOTAL $18,000 00
I .-
I
!
I
NOTE Costs include expected revenue
.
POOL OF EROSION PRIORITY SITES 198q - PEEL (BRAHPTON)
TECIINICAL
LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS
---
93 Scott Street Etobicoke Ck Brampton 1 Problem Slope failure and riverbank erosion
Structure Affected Private property
Height of Bank II 8m
Length of Bank 35m
WH-1Q2, Beamish 'Court West Humber Brampton 2 prob! em Slope failure and river bank erosion
Wild field River Structure affected Private property
Height of Bank 8m
Length of Bank: 15m
.
lJl
I
w
Ul
......
---
--
OJ
I
w
VI
IV
POOL OF EROSION PRIOHITY SITES 198~ - PEEL (MISSISSAUGA)
TECHNICAL
LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS
.
2130 Dund as St West Etobicoke Ck Mississauga 1 Problem Slope failure and riverbank erosion
.
- Structure Affected Factory parking lots
Height of Bank 900
Length of Bank 7000
6~69 Netherhart Road Etobicoke Ck Mississauga 2 Problem Slope failure and river bank erosion
Structure affected Storage area behind
industrial building
Height of Bank: 12m
Length of Bank ~Om
.
.
POOL OF EROSION PRIORITY SITES 1984 - PEEL (CALEDON)
---------.---------.-- _._------ ---
TECHIIICAL
LOCATION WATERSHED MUNICIPALITY PRIORITY COMMENTS
._-- ------_.- -.-----_._- ~--- ---- ------
Albert and John Street Humber River Caledon Problem Riverbank erosion
Structure Affected Eight residences
Height of Bank 2 9m
Length of Bank 100m
.
I
I
I
I
I
i
III
I
w
VI
w
B-354
EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF YORK
.
1984 PROGRAM
.
AS PROPOSED IN
PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION
IN THE REGIONAL MUINICIPALITY OF YORK
1982 - 1984
"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
AUGUST, 1983
.
B-355
EROSION CONTROL AND SLOPE STABILIZATION
IN THE REGIONAL MUNICIPALITY OF YORK
1984 PROGRAM
INTRODUCTION
Given the number of sites requiring erosion control and slope stabilization
work throughout the Region of York, major remedial work is undertaken on
a priority basis The original priority ratings listed in the Erosion
Inventory and Priorities Study of 1977 were used as a starting point in
assessing the rate of progress and deterioration of erosion sites A 'Pool
of Erosion Sites' was prepared from this study and is continually updated
with new sites experiencing erosion problems The technical priorities within
this pool are reviewed on a regular basis to reflect the dynamics of the
erosion process at each specific site
The annual wor~ program which was formulated on a priority basis using
the 1984 'Pool of Erosion Sites', and the sites bearing high priority ratings
are listed in the respective sections of this report
. .
1984 is the third year of the 19~2 - 1984 Project for Erosion Control and
Slope Stabilizacion in the Regional Municipality of York The budget ~r
the 1984 Work Program is ~20,000 00
B-356
PROGRESS REPORT
The following is a list of sites at which remedial work was carried out,
from the inception of The Interim Water and Related Land Management Project,
1979 - 1981 and for the first two years of the 1982-1984 Erosion Project
LOCATION WATERSHED WORK YEAR
7374 Kipling Avenue, Woodbridge Humber River 1979
(Rainbow Creek)
,
7440 Kipling Avenue, Woodbridge Humber River 1979
(Rainbow Creek)
8240 Pine Valley Drive, Woodbridge Humber River 1979-1980
14th Avenue, Markham Rouge River 1979-1980
19th Avenue, Markham Rouge River 1919
King Township and Town of C~edon Line Humber River 1979
.
(Cold Creek)
Cedar Grove Community Centre Rouge River 1980
146 Riverside Drive, Woodbridge Humber River 1980
Postwood Lane, Markham Don River 1980
Pine Grove Vicinity Humber River 1980
~orth Don Sewage Treatment Plant Don River 1981
Kennedy Road West, Markham Don River 1981
NObleton, Lot 5, Con 8 (Cole Farm) Humber River 1982
5760 Kirby Sideroad, Humber River 1982-1983
,
8-357
1984 WORK PROGRAM
The Regional Municipality of York
The following table lists the proposed work program for 1984 and the respective
budget analysis
I ITEM I ESTIMATED COST I
!
I
I
i
!
I 1) Survey and Legal $2,000 00
! . I
I
! ii) Major Remedial I I
i I
I I
House adjacent to 8uttonville I $18,000 00
I I
Golf Club
I I
i I
I I I
,
I
I
TOTAL $20,000 00
i
I
!
I
NOTE The costs include expected revenue
OJ
I
w
VI
POOL OF EROSION PRIORITY SITES 1984 - YORK CD
TECHNICAL
LOCA TION WATERSHED MUNICIPALITY PRIORITY COMMENTS
-
House adjacent to Rouge River Markham 1 Problem Riverbank erosion
Buttonville Golf Club Structure Affected One house
Height of Bank 10m
Length of Bank 15m
9825 Hwy 27 Klienburg Humber River Vaughan 2 Problem Riverbank erosion
Structu~e Affected One house and shed
Height of Bank 1 5m
Length of Bank 100m
R R 13. Woodbridge Humber River Vaughan 3 Problem Riverbank erosion
Structure Affected One pool and one tennis court
Height of Bank: 4 8m
Length of Bank 35m
Warden Avenue at
-
Major Mackenzie Dr Rouge River Markham 4 Problem Riverbank erosion and slope failure
Structure Affected one residence
Height of Bank 5m
Length of Bank 30m
.
7195 McCowan Road Rouge River Markham 5 Problem Riverbank erosion
Structure Affected One house
Height of Bank 5m
Length of Bank 6m
.
B-359
EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF DURHAM
-
1984 PROGRAM
AS PROPOSED IN
PROJECT FOR EROSION CONTROL AND SLOPE STABILIZATION'
IN THE REGIONAL MUINICIPALITY OF DURHAM
1982 - 1984
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
AUGUST, 1983
,
B-360
EROSION CONTROL AND SLOPE STABILIZATION
IN THE REGIONAL MUNICIPALITY OF DURHAM
1984 PROGRAM
INTRODUCTION.
Given the number of sites requiring erosion control and slope stabilization
work throughout the Region of Durham, major remedial work is undertaken on
a priority basis The original priority ratingsltisted in the Erosion
Inventory and Priorities Study of 1977 were used as a starting point in
assessing the rate of progress and deterioration of erosion sites A 'Pool
-
of Erosion Sites' was prepared from this study and is continually updated
with new sites experiencing erosion problems The technical priorities within
this pool are reviewed on a regular basis to reflect the dynamics of the
erosion process at each specific site
The annual work program which was formulated on a priority basis using
the 1984 'Pool of Erosion Sites', and the sites bearing high priority ratings
. are listed in the respective sections of this report
- ,
1984 is the third year of the 1982 - 1Q84 Project for Erosion Control and
Slope Stabilization in the Regional Municipality of Durham The budget for
the 1984 Work Program is $5,000 00
B-36l
PROGRESS REPORT
The following is a list of sites at which remedial work was carried
out from the inception of the Interim Water and Related Land Management
proj ect , 1979-1981 and for the first two years of the 1982 - 1984 Erosion
Project
LOCATION WATERSHED- WORK YEAR
16 Elizabeth Street, Ajax Duffin Creek 1979
558 Pine Ridge Road, Pickering Rouge River 1979
Hockey Ranch, Pickering Duffin Creek 1980
Woodgrange Avenue, Pickering Rouge River 1931
Al tona Road, Pickering Petticoat Creek 1981
Side road 30 Olhitevale) Duffil\ Creek 19~2
B-362
1984 WORK PROGRAM
The Regional Municipality of Durham
The following table lists the proposed work program for 1984 and the
respective budget analysis
.
I ITEM EST'IMATED
1) Remed ial I
Green River Park $5,000 00
,
TOTAL $5,000 00
.
.
POOL OF EROSION PRIORITY SITES 1984 - DURHAM
- TECHtlICAI -
LOCATION WATERSHED MUNICIPALITY PRJOH1TY COMMENTS
------
I
Green River Park, 0-16 West Duffin Pickering 1 Problem Riverbank erosion
Creek Structure Affected One outdoor dining pavillion
Height of Bank 6.5m
Length of Bank gOm
1840 Altona Road, D-15 Petticoat Pickering 2 Problem Riverbank erosion
Creek Structures Affected One residence and one pool
Height of Bank 1 1m
Length of Bank 20m
1436 Highbush Trail Petticoat Pickering 3 Problem Riverbank erosion
Creek structures Affected One garage
Height of Bank 5 5m
Length of Bank 20m
Brock Road at Finch Duffin Creek Pickering 4 Problem Riverbank erosion
Avenue Structures Affected One shed
, Height of Bank 1 5m
Length of Bank 20m
~ CD
I
w
0'\
w
'" ..
,
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
DIVI~IONAL EXPENDITURE SUMMARY
FOR TilE FERIOD JULY 1, 19133 to JULY 31, 1933
Expenditures
Current Year to Funds ,
Dur1gc t Honth Date Available Spent
, ~ ~ $ $
,
Finance & Admin.(inc1. L~nd Acq.) 3,186,465 244,407 1,563,364 1,623,101 49.1
Water Resourc~ - Flood Co~trol 2,911,389 114,473 1,101,789 1,809,600 37.9
Water Resourc~ - Waterfront 2,325,000 130,337 711,023 1,613,977 30.6
Conservation Land Management 3, 54ft ,345 340,786 2,034 ,392 1,513,953 57.3
Information , Education 2,426,623 265,045 1,247,481 1,179,142 51.4
Historical Si~es 3,912,822 - 153,308 1,102,606 2,910,216 28.2
Vehicle' Equipment - CapItal Acq. 290,730 2,306 121,132 159,598 43.1
,
SUB-TOTAr. 18,591,374 1,250,662 7,8111,787 10,709,587 42.4
Vehicle & Equipment - Operations -- 17,689 133,221 -- -- !
Special Proj€cts -- 92,754 429,283 -- --
C.O.E.D. 1983/84 2,123,808 166,332 488,821 1,634,987 23.0
Food ServIces 833,317 1<28,559 408,140 345,177 58.6
r...
TOTAL 21,5413,499 1,675,995 9,420,252 12,689,751 43.7
iii
...J
:J ............~........._B__e....._..a.e_.c...........m................
..,. 0
\D iii
M :J:
I U
III lJ)
,
ll)
It)
,..,
I
ro
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
DIVISIONAL EXPENDITURE SUMMARY
FOR THE PERIOD AUGUST 1, 1983 to SEPTEMBER 4, 1983
..
_~XJ'~!ljL~u..!~__
Current Yea r to Funds %
BU~~..!:. Month Date Available ~J>~!l..!:.
---r-- ---r-- ----T--
Finance & Admin.(inc1. Land Acq.) 3,186,465 184,101 1,747,465 1,439,000 54.8
Water Resource - Flood Control 2,911,389 406,399 1,508,188 1,403,201 51 8
Water Resource - Waterfront 2,325,000 195,757 906,780 1,418,220 39.0
Conservation Land Management 3,548,345 407,573 2,441,965 1,106,380 68 8
Information & Education 2,426,623 166,159 1,413,640 1,012,983 58.3
Historical sites 3,912,822 197,580 1,300,186 2,612,636 33 2
Vehicle & Equipment - Capital Acq. 280,730 (327) 120,805 159,925 43 0
----------------------------------------------------------------------
SUB-TOTAL 18,591,374 1,557,242 9,439,029 9,152,345 50.8
Vehicle & Equipment - Operations -- 31,984 165,205
Special Projects -- 80,835 509,118
C.O.E.D. 1983/84 2,123,808 202,685 691,506 1,432,302 32-6
Food Services 833,317 118,239 606,379 226,938 72 8
----------------------------------------------------------------------
TOTAL 21,548,499 1,990,985 11,411,237 10,811,585 53.0
============================================:==========================
,
1983.09.14 \
.
Ct.. B-366
,
the metropolitan toronto and region conservation authority
minutes REPORT #17/83
EXECUTIVE COMMITTEE 19-0CTOBER-1983 #17/83
The Executive Committee met at the Authority Office,S Shoreham Drive, Downsview,
on Wednesday,19 October, 1983
PRESENT FOR THE HEARING
Chairman Mrs. F.E Gel!
Members W G. Barber
Mrs L. Hancey
H.C. Lawrie
S A Macpherson
(For M W H. Biggar) F R Perkins
J S. Scott
Mrs. N Stoner
Following the roll call, the meeting adjourned to hold a hearing re
Alliance-Rockcliffe Limited
City of Mississauga
Etobicoke Creek Watershed
PRESENT FOR THE MEETING
Chairman Mrs F.E Gel!
Vice-Chairman E V. Kolb
Members W G Barber
E Fulton
Mrs. L Hancey
H C Lawrie
S A Macpherson
Ms S Nimmo
(For M W H Biggar) F R Perkins
J S Scott
Mrs N. Stoner
ABSENT
Member M W H Biggar
MINUTES
Res #278 Moved by: Mrs N Stoner
Seconded by H.C Lawrie
THAT the Minutes of Meeting #16/83 be approved
CARRIED
SECTION I
FOR CONSIDERATION
l. ENVIRONMENTALLY SIGNIFICANT AREAS STUDY (1982)
Res #279 Moved by H.C. Lawrie
Seconded by Mrs N. Stoner
THAT the staff report (together with the Summary - Environmentally Significant
Areas Study, 1982, appended as Schedule "A" of these Minutes) be received,
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendation #2 of Report #2/83
of the Conservation Land Management Advisory Board, as amended and set forth
herein, be approved
B-367 -2-
#4 THAT the concept of environmentally significant areas be recognized
as a component of The Metropolitan Toronto and Region Conservation
Authority's implementation of its mandate,
THAT the Watershed Plan, in particular the Land Acquisition Program and
the Conservation Land Management Program, be amended to incorporate the
ESAs currently identified and the concepts of ESA management,
THAT environmental reviews be undertaken for all proposed MTRCA works
which may impact ESAs and, where potential impacts are identified, the
means of mitigating these potential impacts be addressed,
THAT individual management plans be prepared for ESAs on land owned and
managed by the MTRCA. Other public agencies who manage MTRCA land or own
and manage their own land be requested to prepare individual ESA management
plans, with the assistance o~ the MTRCA or other appropriate agencies,
THAT management guidelines be prepared by the MTRCA explaining the
significance of ecological systems (i e marsh, forests, etc ) , and
identifying the benefits/disbenefits of various actions,
THAT a strategy be prepared within the Community Relations Program to
inform and/or educate the general public and private landowners con-
cerning ESAs,
THAT all master drainage planning undertaken by the MTRCA or in con-
junction with the municipalities, other agencies, or developers,
recognize and incorporate ESAs,
THAT the MTRCA utilize ESA information as part of the data base for the
municipal plan review process,
THAT the regulatory powers of the MTRCA, under Section 28 of the
Conservation Authorities Act, with respect to the placing or dumping of
fill, be investigated as to their potential to include those ESAs not
currently regulated,
THAT the ESA data base be maintained and defined in conjunction with the
MTRCA's member municipalities, the Province of Ontario, affected agencies,
special interest groups, and others,
AND FURTHER THAT copies of the Environmentally Significant Areas
Study (1982) be forwarded to the Authority's member and local
municipalities and other appropriate government agencies and interest
groups as a background resource document
CARRIED.
SECTION II
FOR INFORMATION
2 BLACK CREEK PIONEER VILLAGE
-Operating Statement
Res #280 Moved by Mrs N Stoner
Seconded by Ms S Nimmo
THAT no change in the operating hours of Black Creek Pioneer Village be made
for the remainder of 1983
CARRIED.
3 CORRESPONDENCE
Mr W A McLean, Acting General Manager, reported receipt of the following
correspondence
(a) Notice from the Grand River Conservation Authority concerning the celebration
of the Tenth Anniversary of the Opening of their Administration Building
with tours, etc on Sunday, October 23
-3- B-368
(b) Letter dated 1983 09 12 from D Cherry, Administrator,
MNR Special Employment Program, concerning a Cabinet Minute informing
the Ministry that $1 0 million has been allocated for a mineral
exploration program in the Sudbury area No additional allocation of
funds will be received by the remaining sectors
(c) Letter dated October 7, 1983, from the Deputy Commissioner of Parks,
The Municipality of Metropolitan Toronto concerning the Project for
the Acquisition of the United Ceramics Ltd (formerly the
Toronto Brick Company Ltd ) advising that. "the project is
dependent on a major contribution from the Provincial Government and,
to this point in time, while discussions have taken place, no
definitive statement has been obtained with respect to any commitment
to such acquisition In this context it is not appropriate to
process the Project to Council. . The matter is, therefore, held
in abeyance at this time ."
DECLARATIONS
MS. S. NIMMO declared a Conflict of Interest concerning correspondence item (c)
above since a client of a firm with which she is associated is interested in
this acquisition
4 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #281 Moved by Mrs N Stoner
Seconded by SA. Macpherson
THAT the applications listed herein as A(l) and A(3) be approved, subject
to the conditions contained in the reports
CARRIED.
A(l) Bramalea Limited
To enlarge culvert under Highway #7, east of Dixie Road,
City of Brampton (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall
form part of the permit
Drawing #822l-B-S, prepared by Paul Theil Associates Limited
and dated June 1983
A(2) - Application of Scarborough Centenary Hospital - WITHDRAWN BY APPLICANT
A(3) The Municipality of Metropolitan Toronto
Roads & Traffic Department
To construct storm sewer outfall into the Highland Creek,
west bank, under Kingston Road
In accordance with the following plans and documents, which shall form
part of the permit
(a) All areas disturbed during construction being restored to the
satisfaction of the Authority.
(b) All work being carried out in accordance with drawings sub-
mitted for Metro Contract #RSO-83
5 WATER & RELATED LAND MANAGEMENT PROJECT
FLOOD WARNING & FORECASTING SYSTEM
-Portable Data Acquisition Terminal
Res #282 Moved by Mrs N Stoner
Seconded by E V Kolb
THAT the purchase of a Portable Data Acquisition Terminal for the Flood
Warning & Forecasting System, at a cost not to exceed $1,200 00, be approved
CARRIED
.-
B-369 -4-
6 WATERFRONT PROJECT SCARBOROUGH SECTOR, FISHLEIGH SITE
-Contract 83 02 - Parking Lot Construction
The following tenders were received for improvements to the parking area
at the former Fishleigh Filtration Plant property, including construction
of concrete curbs, installation of gravel base and asphalt paving of the
parking lot extension, and asphalt re-surfacing of the existing parking
area:
COMPANY NAME TENDERED AMOUNT
Associated Paving Co Ltd $19,738 00
D. Crupi & Sons Limited $20,995.00
Empire Paving Limited $24,640 00
Res #283 Moved by H C Lawrie
Seconded by: W.G. Barber
THAT Contract #83-02 for site paving at the Fishleigh site, Scarborough
Sector, Waterfront Project, be awarded to the low bidder,
Associated Paving Company Limited, in the amount of $19,738 00.
CARRIED.
7 SHORELINE MANAGEMENT PROGRAM SCARBOROUGH SECTOR, SOUTH MARINE DRIVE
-Contract 83-03 - Quotations for Quarry Stone
The following quotations were received for the supply and delivery of
rip rap stone and armour stone for shoreline protective work at the
above location
COMPANY NAME Armour Stone Rip Rap Stone
Price-per-tonne Price per tonne
By Trailers By Tandems
1 Canada Crushed Stone $13 00 $11 60 No Bid
2 Nelson Aggregate Ltd $14 35 $11 30 $11 90
3 Limestone Quarries $15.15 No Bid No Bid
4 Indusmin Ltd $16 40 $12 20 $12 75
5 Vineland Quarries No Bid $12 00 No Bid
Estimated quantities of stone required are 3,500 tonnes of 3 - 5 tonne
armour stone, and 1,950 tonnes of 250 mm to 600 mm rip rap stone
Res #284 Moved by E. Fulton
Seconded by S A Macpherson
THAT the following quotations be accepted for the supply and delivery of
quarry stone for shoreline protective work along South Marine Drive,
Scarborough, at a total cost of $67,535.00 for the estimated quantity
Canada Crushed Stone arm our stone at $13 00 a tonne
Nelson Aggregate Ltd rip rap stone at $11 30 a tonne by
tractor trailers or $11 90 a tonne
by tandem trucks
CARRIED
8 SHORELINE MANAGEMENT PROGRAM SCARBOROUGH SECTOR, FALLINGBROOK DRIVE
-Contract 83-04 - Quotations for Quarry Stone
The following quotations were received for the supply and delivery of
rip rap stone and armour stone for shoreline protective work at the
above location
,
-5- B-370
COMPANY NAME Armour Stone Rip Rap Stone
Price per tonne Price per tonne
1 Canada Crushed Stone $13 .00 No Bid
2. Nelson Aggregate Ltd $14 35 $11 32
3 Limestone Quarries $15 15 No Bid
4 Indusmin Ltd $15.95 $12.70
5 Vineland Quarries No Bid $12 00*
*(By trailers only)
Estimated quantities of stone required are 6,000 tonnes of 3 - 5 tonne
armour stone, and 2,000 tonnes of 250 mm to 600 mm rip rap stone
Res #285 Moved by Mrs N Stoner
Seconded by E. Fulton
THAT the following quotations be accepted for the supply and delivery of
quarry stone for shoreline protective work along Fallingbrook Drive,
Scarborough, at a total cost of $100,640 00 for the estimated quantity
Canada Crushed Stone armour stone at $13 00 a tonne
Nelson Aggregate Ltd rip rap stone at $11 32 a tonne
CARRIED.
9 HISTORICAL PLAQUE
Res. #286 Moved by W.G. Barber
Seconded by F R Perkins
THAT the Town of Vaughan be requested to consider the erection of a
plaque commemorating the original Woodbridge office site of
The Metropolitan Toronto and Region Conservation Authority
CARRIED
10 AUTHORITY AND STAFF ANNUAL DINNERS,
AND CHILDREN'S CHRISTMAS PARTY
Res #287 Moved by H C Lawrie
Seconded by S A Macpherson
THAT the Secretary-Treasurer be authorized and directed to make such
arrangements as may be necessary for
Members' 27th Annual Dinner - to be held Sunday, December 4, 1983,
at the Boyd Conservation Field Centre,
Staff Annual Dinner - to be held Saturday, December 17, 1983,
at the Shrine Temple,
Children's Christmas Party - to be held Saturday, December 10, 1983, in
the Woodbridge Public School auditorium
AND FURTHER THAT any expenses incurred over and above those normally
recovered from the Members and staff be paid by the Authority
CARRIED
11 KORTRIGHT CENTRE FOR CONSERVATION
-Sheltered Patio Eating Area
Res #288 Moved by Mrs L Hancey
Seconded by Ms S Nimmo
THAT the firm of Shore Tilbe Henschel Irwin Peters, Architects & Engineers,
be awarded the contract fer the working drawings for the sheltered patio
eating area at the Kortright Centre for Conservation, for a fee of $6,250 00
CARRIED
B-371 -6-
12 DECISION OF HEARING
-Al11ance-Rockcliffe Limited
City of Mississauga
Etobicoke Creek Watershed
Res #289 Moved by J S Scott
Seconded by Mrs N. Stoner
THAT the application of Alliance-Rockcliffe Limited, in accordance with
Ontario Regulation 170, for permission to construct structures in the
flood plain of the Etobicoke Creek, City of Mississauga, be refused for
the following reasons
That the application, as submitted, would affect the control
of flooding and the conservation of land
CARRIED.
13 NEW BUSINESS
The Chairman announced that she has been informed by the Cabinet Office that the
Lieutenant-Governor in Council has appointed seven persons to the
Board of Governors of the Guild Inn, and that one of these is Mr W E Jones.
The Vice-Chairman expressed his appreciation to all staff responsible for the
Official Opening arrangements for the Bolton Channel
Mrs Gell reminded the Members that the Executive meeting of November 2nd will be
held at 1 00 pm., and commence with lunch at 12 00 noon The Sod Turning
ceremony by the Honourable Susan Fish for the Black Creek Pioneer Village
Visitor Centre will start at 3 30 P m on that date
14 TERMINATION
On motion, the meeting terminated at 11 00 a.m , October 19, 1983
Florence E Gell W E. Jones
Chairman Secretary-Treasurer
KC
B-372
SCHEDULE "A"
SUMMARY
ENVIRONMENTALLY SIGNIFICANT AREAS STUDY
1982
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
: B-373
SUMMARY
ENVIRONMENTALLY SIGNIFICANT AREAS STUDY
In 1978, a study of Environmentally Significant Areas was initiated by staff of
The Metropolitan Toronto and Region Conservation Authority (MTRCA)
The purpose of the study was to identify ESAs and to suggest direction for their
management.
The study comprises four phases (FIGURE 1). The first three phases were completed
over a period of four years (FIGURE 2) Phase I involved the review of other ESA
studies and existing information sources to prepare a preliminary list of
candidate significant areas. Criteria for the identification of ESAs were also
developed. Phase II extended over the following three summers for inventory of
the candidate areas At the completion of each field season, an interim report
was prepared identifying areas considered for ESA designation. The completion of
the third interim report marked the onset of Phase III. This phase involved the
assessment and designation of ESAs based on the interim reports and fine tuning of
the selection criteria. Phase IV will be an ongoing exercise of updating ESA
information. This updating will permit the designation of new ESAs, the deletion
of those which no longer fulfill the selection criteria or the refinement of
others
Due to the overall size of the MTRCA's jurisdiction and in consideration of time,
staff availability and funds, the study area was limited to the inclusion of major
natural resource areas only These resource areas were:
- the Oak Ridges Morraine (including the Niagara Escarpment)
- the primary valley systems (areas draining 1300 ha or greater), and
- the Lake Ontario Waterfront
As a result, the current ESA study should be considered as a first step.
Additional studies beyond the bounds of the current study are possible in the
future In th interest of consistency, it is suggested that any such additional
studies by other agencies or groups use the selection criteria and interpretations
established by the MTRCA
ESA Criteria
In compiling criteria for the selection of ESAs, the MTRCA reviewed similar
studies throughout the Province The selection criteria used are as follows
Criterion 1
The area represents a distinctive and unusual landform within
the MTRCA region, Ontario or Canada.
B-374
COI.LECT AND REVIEW EXISTING
PHASE I DATAIINFORMATION
LOCAL AGENCIES
INTEREST GROuPs
POlSONAL INTERVIEWS
. PIIEYIOUS STUDIES
( _ZE
MTERCOURSES
-- -- --- ----- --------
PHASE II
------- ------
PHASE m
- ---
PHASE 17
FlOW CHART
-~
FIG. 1
-
,--.. ')
- III
I
W
-..I
VI
I LEGEND
...... OEVElDPINO ZONE 19"
--- ::'~~E>HEADWAT[ll ZONE IS80
0 '- ~
, I , - PRIUARY \!lU.EYS > DEVElDPEO ZDNE '981
. , , ~
0 6",_ WATERfRONT
ENVIRONMENTALl..Y SIGNIFICANT TIME FRAME FIG. 2
~ the metropolitan toronto and region AREAS STUDY
conservation authority
B-376
- 2 -
Criterion 2
The ecological function of the area contributes
significantly to the healthy maintenance of a natural system
beyond its boundaries:
(a) the area serves as a water storage area or high soil
permeability area, or
(b) the area helps to maintain or link significant natural
biological systems, or
(c) the area is essential for the healthy continuation of a
significant species and/or significant population or
concentration of species
Criterion 3
The habitat and/or biological communities are identified as
exceptional and/or of high quality within the MTRCA region,
Ontario ~r Canada
Criterion 4
The area contains an ecosystem which has limited
representation in the MTRCA region, Ontario or Canada and/or
is a small remnant of a particular habitat which has virtually
disappeared within the region
Criterion 5
The area has an unusually high diversity of biological
communities and/or species
Criterion 6
The area provides habitat for indigenous species that are rare
and/or endangered regionally (MTRCA), provincially and
nationally.
Criterion 7
The area is sufficiently large to afford habitat for species
which require extensive blocks of suitable habitat.
The study was approached from a biophysical viewpoint, with emphasis on
geomorphological features, surface hydrology, and terrestrial and aquatic ecology
The geomorphological component provided information on significant or unusual
landforms for the region The surficial hydrology provided information on areas
of high soil permeability and surficial water storage areas Terrestrial and
aquatic ecology provided data on areas containing rare and significant species or
population of species, habitats and ecosystems, and areas that are essential to
maintaining biological continuity
Approximately 126 ESAs were identified as a result of the study These ESAs and
the criteria they fulfill have been identified on the attached summary Table 1
TABLE 1 CD
ENVIRONMENTALLY SIGNIFICANT AREAS BY MUNICIPALITY I
w
-.J
-.J
ESA Criter1a Fulfilled Area
Municipali tv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) ownership .
COUNTY OF
DUFFER IN
Township of 43 Humber River Canada Co Forest X X X X 15 78 pr
Mono
COUNTY OF
SIMCOE
Township of 44 Humber River Lee Area X X X 134 93 pr
Adjala
45* Humber River Simcoe-Albion Forest X X X X 214 32 A, pr
REGION OF
PEEL
Town of 33 Humber River Hanna-Donaldson Area X X X 39 72 pr
Caledon 34 Humber River Vance-Donaldson Area X X 42.94 A, pr
35 Humber River Centreville Creek Area X 150 97 pr
36 Humber River Caledon East Complex X X X 175 98 pr
37 Humber River Caledon East Forest X X X 54 17 pr
38 Humber River McCarthy Area X 9 33 pr
39 Humber River Evans-Milburn Area X X 118 89 pr
40 Humber River Caledon Hills Complex X X X X X X X 1332 82 A, pr
41 Humber River Sleswick Complex X X X X X X 266.82 A, pr
42 Humber River O'Laughlin Area X X X X 45 43 A, pr
45* Humber River Simcoe-Albion Forest X X X X 214 32 A, pr
46 Humber River Coolaghan's Forest X X X X X 163 53 pr
47 Humber River Palgrave Cedar Forest X 10.20 pr
48 Humber River Lonicera Site X X 1.09 A
49 Humber River Tuckerman's Site X 2 09 A
50 Humber River Centreville Creek Complex X X 22 19 I A, Pr
,.
Tl - 2
ESA Criteria Fulfilled Area
Municipalitv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnershio
51 Humber River Walton's Forest X X 32 25 pr
52 Humber Ri ver Castlederg X 42 09 pr
53 Humber River Callay-Monkman Area X 17.47 Pr
City of
Brampton 3 Etobicoke Cr Heart Lake Woodlands X X X X 53 16 A
City of
Mississauga 1* Etobicoke Cr Silverthorn Area X 0.96 A, Pr, P
2 Etobicoke Cr Etobicoke Twinleaf X 12 67 A
REGION OF
YORK
Township of 54 Humber River Cold Creek Swamp X X X 46.89 A
King
55 Humber River pogonia Fen X X X 1.67 pr
56 Humber River King-Vaughan Forest X X X 50. 72 P, Pr
57 Humber River King Forest X X 59 29 pr
58 Humber River Spiranthes Site X 1 02 Pr
Town of 15 Humber River Woodbridge Cut X o 49 P
Vaughan 16 Humber River Clarence Street Forest X X o 63 P, Pr
17 Humber River Elder Mills Forest X X X 68 67 pr
18 Humber River Smith's Beech Forest X 5 74 Pr
19 Humber River pine Grove Forest X X 8 94 A, Pr
20 Humber River Boyd's Rock Cress X o 51 A
21 Humber River Pine Valley Forest X X 36 69 A, Pr
22 Humber River Carex Peckii Area No 1 X o 80 pr
23 Humber River Carex Peckii Area No 2 X 0.54 A
24 Humber River Graham's Forest X X X 3 54 pr
25 Humber River Graham's Forest COmplex X X 12.42 A
26 Humber River McLean's Forest X X 11 94 pr
27 Humber River Graham's Woods X X 6 76 A
28 Humber River Kortright Area X X X X 81. 97 A
29 Humber River Boyd Forest X X 11 62 A
30 Humber River McFayden Forest X X X 11. 60 A, Pr
31 Humber River Sprengel's Area X X 12 38 A, pr
32 Humber River Glassco X X X 58 97 A. P
56 Humber River King-Vaughan Forest X X X 50 72 P, Pr
72 Don Ri ver Cook's Area X X 14.71 pr CD
I
73 Don River McGill Area X X 115.43 pr w
X ~
CD
Tl - 3 CD
I
w
~
ESA Criteria Fulfilled Area \0
Municipality No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership
Town of 59 Humber River Bond Lake Bog X X X 4.10 Pr
Riclunond Hill 60 Humber River Forester Marsh X 5 97 pr
71 Don River Richvale Forest X X 19.21 Pr
90 Rouge River Jefferson Forest X X 20 65 Pr
91 Rouge River Wilcox Lake Bog X X X 40.90 pr
92* Rouge River Simeon Lake Forest X X X 197.88 pr
Complex
93* Rouge River Bloomington Wetlands X X 17 83 pr
Town of
Whitchurch- 92* Rouge River Simeon Lake Forest X X X 197 88 pr
Stouffvile Complex
93* Rouge River Bloomington Wetlands X X 17.83 Pr
107 Duffin Creek Stouffville Forest X 11. 32 A, P
Town of
Markham 89 Rouge River Unionville Marsh X 1.82 Pr
METROPOLITAN
TORONTO
Borough of 1* Etobicoke Cr Silverthorn Area X o 96 A, Pr, P
Etobicoke 4 Humber River Sassafras Site X 0.74 P
5* Humber River Humber River Marshes X X X 48.25 A, Pr, P
6 Humber River Home Smith Area X X 3 26 Pr
8 Humber River Lambton Woods X X X 23 43 A, P, Pr
9 Humber River Chapman Valley X X 17.80 P. Pr
10 Humber River Garland Park X 1.20 A, P
11 Humber River Humber College Arb. X 3 60 A
13 Humber River Thistletown Oxbow X 9 23 A, P, Pr
City of 5* Humber River Humber River Marshes X X X 48 25 A, Pr, P
Toronto 114 Waterfront High Park Area X X X X X 27 51 P
115 Waterfront Hanlan Area X 16 71 P
116 Waterfront Mugg's Island X X 10 53 P
117 Waterfront Wildlife Sanctuary X X 21. 00 P
118 Waterfront Snake Island X 3.54 P
119 Waterfront East Ward's Island X X 6.97 P
120 Waterfront Aquatic Park X IX X X 56 89 P
121 Waterfront Glen Stewart Ravine , X X 9 93 P
Tl - 4
ESA Criteria Fulf11led Area
Municipality No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership
Borough of
York 7 Humber River Lambton Park X X 871 A, P
City of 12 Humber River Bluehaven Area X o 94 A, P
North York 14 Humber River Rowntree Mill Swamp X 3 88 A
63 Don Ri ver Wilket Creek Forest X X X X 35 04 A, P
64* Don River Burke Brook Forest X X 19 23 A, pr
65 Don River Glendon Forest X X 43.46 A, P, Pr
66 Don River Earl Bales Woods X 7 26 pr
67 Don Ri ver Bell's Woodlot X 3 74 P
68 Don Ri ver Black Grass Site X 1 70 Pr
69 Don Ri ver East Don Valley Swamp X X X X 57 71 A
70 Don River William's Area X 1. 21 A, P
Borough of 61 Don Ri ver Don Valley Brickyard X 0.88 pr
East York 62 Don River Taylor Creek Site X 44.68 A, P, pr
64* Don River Burke Brook Forest X X 19.23 A, Pr
Borough of 74 Highland Cr Stephenson's Swamp X X 44 25 A, P, pr
Scarborough 75 Highland Cr Highland Forest X X 82 41 A, P
76 Highland Cr Hague Park X X 4 49 P, pr
77 Highland Cr Morningside Park Forest X 82.48 A, P
79* Rouge River Rouge Marsh Area X X X X X 84.54 A. P, Pr
80 Rouge River Rouge-River Whitby
Formation Section X o 07 A
81* Rouge River Little Rouge Forest X X X X X 119 55 A
82 Rouge River Morningside Creek Forest X X X X X X 60 85 A, P, pr
83 Rouge River Tabor's Horsetail Meadow X X 371 A
84 Rouge River Core Woods X 7 03 A
85 Rouge River Pearce Woods X X 5 80 A
86 Rouge River Diller Woods X o 88 A, P
87 Rouge River Milne's Forest X X X 55 47 A, Pr
88 Rouge River Woodlands X X X 14 28 P
122 Waterfront Fallingbrook Woods X 077 Pr
123 Waterfront Scarborough Bluffs
Sequence X 72 94 A, P, Pr
124 Waterfront Guild Woods X X 10 27 A
1125 Waterfront I East Point 1 X I X X X X 12 20 A, P
CD
I
w
CXI
0
-. \~
Tl - 5 CD
I
w
CD
Criteria Fulfilled I-'
ESA Area
Municipalitv No Watershed Local Name 1 2a 2b 2c 3 4 5 6 7 (ha) OWnership
REGION OF
DURHAM
Town of 108 Duffin Creek Uxbridge Forest X X X X X 105.82 pr
Uxbridge 109 Duffin Creek Bro.m-Shaw Area X X 25 92 Pr
110 Duffin Creek North Glasgow Area X X X X X 247 42 Pr,A
111* Duffin Creek Uxbridge Forest Kames X X X X X X X X 301. 60 A. Pr
Town of 78 Rouge River Rouge Lakeshore Swale X X X 1.47 A, pr
Pickering 79* Rouge River Rouge Marsh Area X X X X X 84 54 A, P, Pr
81 Rouge River Little Rouge Forest I X X X X X 119.55 A
94 Rouge River Petticoat Creek Forest X X X X 44 44 A, P
95 Duffin Creek Altona Forest X X X X 48.40 Pr
103 Duffin Creek Byer-Saddler Area X X X X 16 20 pr
104 Duffin Creek Birrell-Boyer Area X X X 44 97 A
105 Duffin Creek Pugh-Holdon Area X X X X 34 38 pr
106 Duffin Creek Pugh Forest X X 2 50 Pr
111* Duffin Creek Uxbridge Forest Kames X X X X X X X X 301. 60 A. Pr
126 Waterfront Frenchman's Bay Marsh X X 14.9 A, P, Pr
Town of Ajax 96 Duffin Creek Duffin Marsh X X X X X 133.82 A, P
97 Duffin Creek Major-spink Area X 31 II A, pr
98 Duffin Creek Whitevale Corridor X X X X X 387.38 A, P, Pr
99 Duffin Creek Haight Area X X 9.78 pr
100 Duffin Creek Boone Woods X X 14 48 A, pr
101 Duffin Creek Hartrick Area X 11 05 A
102 Duffin Creek Greenwood Richweed Site X 1 13 A, pr
112 Carruther's Carruther's Creek Marsh X X X X 41 63 pr
Creek
113 Carruther's Carruther's Creek Forest X X X 52.32 pr
Creek
OWnership: A - Authority
P - Public
Pr - Private
*Site overlaps municipal boundarie
, B-382
- 3 -
Management
The type and degree of management to be applied to an ESA can only be determined
after the fundamental issue of preservation vs protection has been addressed.
Preservation involves the artificial maintenance of an ESA at a specific point in
its successional history The natural processes are interfered with to retain a
desired state. For example, it may be desirable to ensure the retention of a
provincially or nationally rare species through active preservation practices, or
to retain a particular state on the basis of educational or scientific
significance.
Protection, on the other hand. concentrates on safeguarding the natural features,
functions and processes of an ESA from external, artificial disturbances Such
disturbances mLght include the physical loss of an ESA due to a land use change or
the physical modification of an ESA by activities such as tree cutting,
indiscriminate dumping or incompatible open space/park uses
Since the protection of an ESA does not interfere with the internal natural
processes of succession, it is conceivable that an ESA designation may be removed
from a site when the selection criteria are no longer satisfied.
The issue of preservation versus protection is complex, making the preference of
one management philosophy over the other difficult, unless examined on a site by
site basis
-
However, as a management strategy guide, it is proposed that all ESAs be protected
to the extent possible, while those ESAs be preserved where site specific
conditions and potential uses warrant
MTRCA Involvement
The MTRCA has been involved in resource management since its inception in 1957
Its most recent planning effort, the Watershed Plan (1980 ) identifies a number of
overall strategies for the management of the river valleys, the Oak Ridges
Morraine and the Lake Ontario Waterfront Three component programs directly apply
to ESAs - the Land Acquisition Program, the Stormwater Management Program and the
Conservation Land Management Program.
The Land Acquisition Program provides the MTRCA with the direction to acquire
lands in and adjacent to the major river valleys, along the waterfront and in the
headwaters zone for general conservation or hazard land protection Wi th the
completion of this ESA study, the implementation of the Land Acquisition Program
can be more finely tuned to include specific boundaries for ESAs.
One of the major principles of the Storm Water Management Program is to minimize
impacts on the watershed system as a result of new development In this regard,
the Program calls for the preparation of master drainage plans, which would
include the establishment of a resource data base and the identification of
development
B-383
- 4 -
constraints The five major concerns to be addressed in a master drainage plan
are flood control, erosion control, water quality, base flow and the environment
With the completion of the ESA study, the environmental component of master
drainage planning will include information on ESAs
The goal of the Conservation Land Management Program is to "contribute to the
quality of land and water resources through a comprehensive program of
conservation land management, including forest management, wildlife habitat
improvement, stream improvement, source area protection, and conservation land
planning." To implement this program, the MTRCA provides technical assistance and
advice to private landowners and public agencies in an effort to maintain sound
conservation management practices The MTRCA also cooperates with others in
identifying and protecting areas of biological and hydrologic significance and
sensitivity as well as in the management of such areas on an individual basis
The orientation of the Conservation Land Management Program is such that the
preparation of management guidelines and the actual management of ESAs can readily
be incorporated
In addition the Fill, Construction and Alterations to Waterways Regulations under
Section 28 of The Conservation Authorities Act, can be applied, in part, to the
ESAs The MTRCA currently has mapped major portions of the valley lands and the
Lake Ontario waterfront within its jurisdiction, in order to administer its
Regulations These regulated areas contain ESAs: however not all ESAs are
contained within these limits The Regulations are permissive in nature and
require the merits of each proposal to be judged on a site specific basis
The MTRCA's Watershed Plan and Regulations do therefore have the potential to
address ESAs, however their current application is limited The following are
suggested for future direction
1 that the concept of ESAs be recognized as a component of the MTRCA's
implementation of its mandate:
2 that the Watershed Plan, in particular the Land Acquisition Program and the
Conservation Land Management Program, be amended to incorporate the ESAs
currently identified and the concepts of ESA management:
3 that environmental reviews be undertaken for all proposed MTRCA works which
may impact ESAs and where potential impacts are identified, the means of
mitigating these potential impacts be addressed:
4 that individual management plans be prepared for ESAs on land owned and
managed by the MTRCA other public agencies who manage MTRCA land or own and
manage their own land also be requested to prepare individual ESA management
plans, with the assistance of the MTRCA or other appropriate agencies:
B-384
- 5 -
5. that management guidelines be prepared by the MTRCA explaining the
significance of ecological systems (i e marsh. forests, etc ) and identifying
the benefits/disbenefits of various actions:
6 that a strategy be prepared within the community Relations Program to inform
and/or educate the general public and private landowners concerning ESAs:
7. that all master drainage planning undertaken by the MTRCA, or in conjunction
with the municipalities, other agencies or developers, recognize and
incorporate ESAs:
8 that the MTRCA utilize ESA information as part of the data base for the
municipal plan review process:
9 that the regulatory powers of the MTRCA, under Section 28 of The Conservation
Authorities Act, with respect to the placing or dumping of fill be
investigated. as to their potential to include those ESAs not currently
regulated: and
10 that the ESA data base be maintained and refined in conjunction with the
MTRCA's member municipalities, the Province of Ontario, affected agencies,
special interest groups and others
It has been recognized that The Metropolitan Toronto and Region Conservation
Foundation (MTRCF) will also assist in the protection of ESAs
To date the financial support of the Foundation has contributed significantly to
several of the MTRCA's major capital projects. With the completion of these
projects, the Foundation's long-term objectives will include the establishment of
a Conservation Land Acquisition Fund for the purpose of acquiring "environmentally
sensitive lands when they come on the market" (MTRCF 1977)
Municipal Involvement
Incompatible land use is perhaps the most significant factor affecting ESAs Much
of the power to control development and, therefore, protect ESAs lies with the
municipalities, under the Planning Act. Municipalities have the ability, through
the land use planning process, to guide and direct development based on the
policies set forth in official plans, secondary plans (or their equivalent),
restricted area (zoning) by-laws, site plan control by-laws and plan of
subdivision controls. Further, where appropriate, innovative measures such as
density transfers or bonus systems may be utilized.
Most of the municipalities within MTRCA jurisdiction have Open Space or
Environmental policy statements in their planning documents which recognize the
significance of the major resource features - the river valleys, the Oak Ridges
Moraine and the Lake Ontario waterfront Few, however, include reference or
policies specific to ESAs This situation is understandable as the municipalities
have been aware of the MTRCA ESA study and have been awaiting its completion
-
B-385 - 6 -
Where new official plans have been developed since 1970, municipalities have
incorporated Hazard Land policies Hazard Lands are areas subject to natural
conditions or physical processes, such as flooding or instability, which pose a
threat to life and property if developed
ESAs on the other hand, are areas which possess unique or unusual natural features
and/or are essential for the maintenance of specific natural processes. ESAs are
susceptible to modification or destruction by human activity Often ESAs may be
found on Hazard Lands, such as a marsh community within the flood plain, however,
not all Hazard Lands are ESAs
Since ESAs may occur within Hazard Lands, it is important to distinguish between
the two in planning policies, in order to ensure that ESAs are adequately
addressed It may be possible to overcome the physical limitations of Hazard
Lands through te9hnical modification, however, this same modification could have
the potential for substantially altering or eliminating the ESA
Similarly, where an ESA is located within lands designated for Open Space,
separate policies specific to ESAs are preferrable as many uses permitted in Open
Space designations may not be desirable for ESAs.
Consideration should be given, therefore, to having ESAs recognized separately or
as an additional level of concern in planning documents distinct from Open Space
or Hazard Lands
~
Central to the protection of ESAs, and probably the most controversial issue, is
the degree of development or land use alteration that may be permitted to occur
Certain Ontario municipalities have established ESAs as "no development" areas,
while others have been prepared to consider low impact development compatible with
the specific characteristics of the individual ESA This principle of "no
development" versus "low impact development" is established in policies at the
Official Plan level Decisions on detailed land use and density, where permitted,
and the delineation of boundaries are left to subsequent stages of the planning
process
While each municipality within the MTRCA's jurisdiction must develop its own
philosophy and approach to ESAs, the following are offered for consideration
1 ESAs, as determined by the MTRCA study or other appropriate studies, be
recognized in the Official Plan It should be noted that additional ESAs or
deletion of areas, if they no longer fulfill the criteria, may be made from
time to time through amendment to the Official Plan
2 The Official Plan should provide policies to define the intent of the
municipality with respect to ESAs Subsequent levels in the planning process
should determine specific policies, details of permitted uses and management
guidelines based on the individual characteristics of any ESA
- 7 - B-386
3 The identification of ESAs in Official Plans and the policy statements
specific to them should be distinct from those for Open Space or Hazard Lands
or their equivalents
4. Proposals for development within or adjacent to an ESA, or having the
potential to affect an ESA, should be accompanied by an environmental impact
study The purpose of the study would be to demonstrate if any adverse
impacts existed and if so the measures which would be taken to minimize the
impacts on the ESA
The possible requirement for an environmental impact study should apply to
both public and private proposals
5 Where appropriate, municipalities should consider the use of such techniques
as density t~ansfer or bonus systems, utilization for calculation of
permissible density or other innovative mechanisms to maintain ESAs and/or
bring them into public ownership.
6 Where ESAs occur within the public open space system, the planning and
management of municipal parklands should recognize and provide for the
protection of ESAs The MTRCA is prepared to cooperate with other public
agencies in this regard
7 The municipalities cooperate with the MTRCA to ensure the integrity of
privately-owned ESAs by forwarding private development or redevelopment
proposals involving ESAs to the MTRCA for review
8 Municipalities seek the cooperation of adjacent municipalities and/or
conservation authorities in addressing ESAs which overlap boundaries
9 The identification of ESAs does not imply that these lands will be purchased
by a public agency not that ESAs on private lands are open for public use
Provincial Involvement
At the Provincial level, the Ministry of Natural Resources and the Ministry of the
Environment are the agencies most involved with the conservation and protection of
the natural environment
The Ministry of Natural Resources has responsibility for conservation of the
natural environment and regulation of commercial and recreational use of natural
resources The following legislation is of direct application to ESAs
- the Lakes and Rivers Improvement Act which regulates the location and nature of
improvement in a water course so as to ensure the perpetuation of the fish,
wildlife and other natural resources dependent on such watersr
B-387
- 8 -
- the Woodlands Improvement Act which enables the MNR to enter into agreements
with private landowners for the planting of nursery stock and improvement of
woodlands Under this Act, Cabinet can also make regulations to designate parts
of Ontario as private forest management areas:
- the Endangered Species Act which preserves areas of natural habitat for
designated endangered species in the Province
- the Fisheries Act which is federal legislation administered in Ontario by the
Ministry of Natural Resources The purpose of this Act is to control activities
that are environmentally detrimental to fish (i e water quality impairment,
habitat destruction, etc )
The Ministry of the Environment, through the Environmental Assessment Act, the
Environmental Protection Act and the Ontario Water Resources Act, also has the
legislative mandate to control any type of pollution which may impair the quality
of the natural environment and to require environmental assessments for various
types of projects
In addition to these legislative powers, the Province is continuing to develop
policies for the management of natural resources An example, which is 0 f
interest to the ESA study, is the Province's Discussion Paper "Towards a Wetland
Policy for Ontario" In this report the Province identifies the rationale for a
strategy to retain wetlands The MTRCA supports this aim as parallel with its own
program objectives
The protection of ESAs is also possible through the new Planning Act This
proposed Act gives the Minister of Municipal Affairs and Housing (jointly with any
other Minister, if a mutual interest exists) the power to issue statements of
policy on matters relating to municipal planning, that in the opinion of the
Minister are of Provincial interest Once issued, municipalities, boards,
ministries, commissions and agencies of the government must have regard to
provincial policy statements in planning matters
Also, under Section 2 of the proposed Act, matters of provincial interest
include
- the protection of the natural environment, and the management of natural
resources:
- the protection of features of significant natural, architectural, historical or
archaeological interest
B-388
- 9 -
Public Irivolvement
Special interest groups will also be encouraged to support the MTRCA and local
municipalities in their endeavours to update ESA data bases and to assist in
management programs, where appropriate
Private landowners of ESAs will be encouraged to retain the natural integrity of
these lands. When land use changes are proposed, landowners will be encouraged to
limit uses to those compatible with the biological and physical functions of the
area
To assist landowners, private lands assistance programs are available through the
MTRCA's Conservation Land Management Program.
Management Practices
The management of an ESA will be dependent upon the type of management desired
(protection versus preservation), individual site conditions, and to varying
degrees on the ownership of the ESA itself
The MTRCA is of the opinion that management plans should ultimately be prepared
for all ESAs Such plans need not be independent, but rather could form a
component of an operations or maintenance plan, an overall resource management
plan for a larger area of a component or a master planning or similar planning
exercise
Although the MTRCA is prepared to cooperate with other agencies and groups in the
preparation of management plans, their preparation is not envisioned as being a
major undertaking The overall thrust in preparing a management plan is to
recognize that the ESA exists and that the significant features of the ESA be
considered in the maintenance or use of the area.
A number of management techniques readily exist to assist the various agencies and
individuals responsible for the management of lands that contain ESAs.
Protection techniques can be arranged into two types - vegetation and access
management Vegetation techniques would include. buffer plantings, woodlot
management, tree and shrub plantings, and controlled grass cuttings For ESAs
suffering from disturbance, access restrictions and/or controls can be employed
Fence construction, signage and posting. trail development and patrolling are all
means whereby this can be accomplished
Management techniques for the preservation of ESAs include. woodlot management,
tree and shrub plantings, selective cuttings and pruning, and controlled burns
In addition, techniques such as nest box and island construction, brush pile
creation and planting of food plots involve wildlife management so that habitats
can be maintained at specific points
B-389
- 10 -
For ESAs currently managed for some purpose, the managers would be in the best
position to prepare management plans or incorporate ESA management techniques in
existing operations or maintenance plans. They are the individuals who have first
hand knowledge of the areas on a day by day basis, including any problems that may
exist
To help establish a coordinated approach to the preparation of management plans,
the MTRCA will prepare an overall priority rating. Priorization will be based on
the need for management due to existing and/or potential impacts. As well, the
MTRCA is prepared to offer assistance to other agencies through technical advice
It is, therefore, the proposal of the MTRCA that the MTRCA prepare management
plans, on a priority basis, for ESAs on MTRCA lands managed by its own forces
For ESAs on MTRCA lands managed, through agreement, with other public agencies or
other publicly owned lands, the preparation of management plans would be the
responsibility of the managing agencies
For ESAs on private lands, the MTRCA will explain to the owners the details of the
ESAs and will discuss any existing and potential impacts. The MTRCA will
encourage landowners to manage the lands in a fashion suitable to the ESAs and
will inform them of the MTRCA's resource assistance programs These programs
include technical advice through the preparation of conservation plans and
technical assistance through reforestation, tree and shrub plantings and stream
improvements
To assist in the preparation of management plans, the following process is
suggested
Step 1
The review of the ESA criteria is essential in formulating any management plan
Site visits must be conducted by qualified resource person(s) who would be able to
interpret the criteria and information accurately
Step 2
The review of the present impacts is accomplished at the same site visit in Step
1 An impact would be considered as any activities, operations or developments
that are occurring, and are or will disturb, destroy or impede the natural
functions or processes that initially qualified the area as an ESA
Step 3
The review of future, potential impacts is just as important as Step 2 The
intent here would be to prevent or minimize the effects of future activities or
development that could impact the ESA
- 11 - B-390
Step 4
Before a management plan is formulated the degree of management and site
protection or preservation must be determined Consideration of educational or
scientific uses of the ESA will assist in this determination.
Step 5
The final stage in the management plan is to document the procedures to be
employed to ensure that the plan is initiated and monitored
The following is a sample ESA site report and a sample management Plan
/
B-39l - 12 -
Sample Management Plan
The following is presented as an example management plan This particular area is
owned and managed by the MTRCA Impacts currently exist and techniques are
proposed to minimize them. A portion of the area is proposed for preservation due
to its educational potential.
General Description
The Pine Valley Forest is located on the east side of the Humber River, south of
Rutherford Road on both sides of Pine Valley Drive in the Town of Vaughan (Figure
3)
The total area (38 hectares) incorporates a number of mature and mature-mixed
forests on the steep west-facing valley walls and on the wide flood plain.
Dominant overstorey species are Eastern Hemlock, Sugar Maple, and American Beech
A swamp cornrnuni~y is interspersed along the wide flood plain in open areas within
the mature-mixed forest
The majority of the Pine Valley Forest is located within the Boyd Conservation
Area or other MTRCA lands with approximately 5 1/2 hectares on private lands
ESA Criteria Fulfilled
~
The Pine Valley Forest satisfies Criterion 3 of the Environmentally Significant
Areas Study The area is considered high quality for the following reasons:
a significant number of seedlings and saplings of Eastern
Hemlock are present in the understorey and ground cover of
the forests:
extensive forests of regenerating Eastern Hemlock are
unusual in the MTRCA region:
Sugar Maple and American Beech exhibit good regeneration:
superior specimens of both Eastern Hemlock and Black Cherry
occur throughout the area: and
the forests are extensive and relatively undisturbed
Current Impacts
The majority of the Pine Valley Forest located in the Boyd Conservation Area is
experiencing some disturbance due to visitors of the area These visitors can be
categorized in the following manner
daily visitors of Boyd Conservation Area:
summer day camp visitors:
group camp visitors:
nature trail visitors
PINE VALLEY FOREST NO. 21 B-392
~a
~ l
)iJ L~
THE NATIONAL
GOLF CLUB
N f BOYD CONSERVATION ESA NO. 21 IZ2d
AREA ----- FIGURE 3
NOT TO SCALE
B-393 - 13 -
These impacts can be summarized as overuse of the present system of trails ( formal
and informal) that are located within the forest plus indiscriminate use of the
forest as a "play area" in sections that are sensitive, such as wet areas and
slopes This problem is not overly critical but does require management so as to
alleviate the more serious impacts and ensure the problem does not expand
Within the Pine Valley Forest are three residential dwellings Trees felled for
firewood is the major impact from this source, but there was also evidence of
dumping of refuse that deteriorated the visual amenities of the forest
Potential Impacts
Currently, the Boyd Conservation Area and adjoining lands are undergoing a master
plan review by the MTRCA All ESAs that could possibly be affected by this
development have been identified and are being taken into consideration throughout
the planning process
Management Approach
The Pine Valley Forest will be managed so as to:
preserve the area dominated by Eastern Hemlock by
encouraging this species to regenerate and maintaining
suitable conditions for regeneration:
protect the remaining areas of this forest stand
The ESA report for the Pine Valley Forest identified significant regeneration of
Eastern Hemlock However, where this is occurring, the density of over storey
species and the maturity of dominant species effectively competes against and
reduces the regenerating component of the woodlot To rectify this problem, a
woodlot management program is required with the following objectives
to promote the regeneration of Eastern Hemlock, through a
program of selective cuttings of over-mature, dead, dying and
diseased species This would effectively open up the dense
canopy and reduce the competition for living space and
available nutrients Such a forest management program will be
cognizant of the role of the forest for habitat and will be
reflected in the selective cuttings by leaving suitable
numbers of den and food trees for the area:
to improve the entire stand's vigour and health through a
program of selective cuttings:
to eliminate any safety hazard from dead or dying trees
that infringe upon visitor use of the trail system:
,
B-394
- 14 -
to promote the habitat for wildlife by creating brush piles
from the slash obtained through the forest management
program.
As identified through field investigation and discussions with area staff, there
occurs an overuse problem with respect to visitors To overcome this problem a
number of management steps will be taken:
. the existing trail system will be upgraded and better
defined so as to encourage visitors to remain on the
trails. The use of signs, self-guided viewing stations and
brochures will help to alleviate the problem:
the extension of the total trail system north to the
Kortright Centre for Conservation is a good possibility
that will encourage visitors to properly utilize the
trails:
discussions will occur between MTRCA staff and the summer
day camp administrator and group leaders for the group camp
area to inform and educate them concerning the ESA
Sensitive areas within the forest will be marked and
identified to these individuals so that further use of the
forest will not affect these areas
To discourage unauthorized activities (Le. firewood cutting) from occurring, the
north and west boundaries will be fenced with a 9-strand farm fence and signs will
be erected identifying the area as an ESA The Trespass to Property Act wil be
utilized with permitted uses signs posted Approximately 600m of fence will be
required.
Discussion will occur between the MTRCA and the local residents (3) to inform and
educate them concerning the ESA These individuals will also be informed of the
permitted activities that may occur in the area If necessary, the rental
agreements that the MTRCA has with these individuals could be modified to reflect
the concerns
Plan Implementation
The Pine Valley Forest management plan has been prepared in conjunction with the
Boyd Conservation Area staff The Area Superintendent is fully appraised of the
plan and is cognizant of his responsibility in its implementation It is
understood that any selective cutting will only be carried out under the direction
and supervision of the Conservation Services Section of the MTRCA Any
modifications to the trail system in the area will be examined as part of the
current Boyd Conservation Area master plan update study, including examination of
impacts
~ B-395
,
the metropolitan toronto and region conservation authority
minutes REPORT #18/83
EXECUTIVE COMMITTEE 2-NOVEMBER-1983 #18/83
The Executive Committee met at the Authority Office, 5 Shore ham Drive, Downsview,
on Wednesday, 2 November, 1983, commencing at 1 00 P m
PRESENT
Chairman Mr s. F E 0611
Vice-Chairman E.V Kolb
Members W.G. Barber
M W H Biggar
E. Fulton
Mrs. t. Hancey
H.C. t.awrie
S.A. Macpherson
Ms S. Nimmo
J S. Scott
Authority Member MM. Smi th, Q C
ABSENT
Member Mrs. N. Stoner
.
MINUTES
Res #290 Moved by W G Barber
Seconded by: M.W.H. Biggar
THAT the Minutes of Meeting #17/83 be approved.
CARRIED
SECTION I
NO ITEMS
.
SECTION II
FOR INFORMATION
1 CORRESPONDENCE
Mr. W.A. McLean, Acting Gener.al Manager,. reported receipt of tha following
correspondence:
(a) t.atter from The Association of Conservation Authorities of Ontario
attachinq copy of letter, dated October 3, 1983, from the Executive
Director of the Association to the Deputy Minister of Natural Resources
concerning Preliminary Provincial Policies for Conservation Authorities:
forwarding the following resolution adopted by the ACAO Executive
Committe~ on September 20, H84-:
"Resolution #54/83
THAT the four ACAO regional chapters be requested to prepare their
collective responses to the MNR Preliminary Provincial Policies for
Conser.vation Authori ties and that these- respon'ses form the ba'sis for
a draft ACAO response to be considered' at the' Board of Directors' meet-
ing in December, 1983 and that the Ministry of Natural Resources be "
advised that the ACAO response will be. submitted by December 31, 1983
B-396 -2-
(b) Letter addressed to Mr Biggar by the Honourable Susan Fish, Minister
of Citizenship & Culture, advising that the application for a 1983
operating grant has recently been approved and a grant of $191,099 00
issued
" It is very encouraging that, in this time of financial
constraint, the Black Creek Pioneer Village was able to
expand its activities and public programming over the
past year and to qualify for this increased grant from my
Ministry
In making this payment, I ask that our support be
acknowledged in all promotional or educational material
produced by the museum We suggest that you use the
phrase 'the assistance of the Ontario Government through
the Ministry of Citizenship and Culture is gratefully
acknowledged'
"
Res #291 Moved by M W H Biggar
Seconded by H C Lawrie
THAT the letter from the Honourable Susan Fish, under date of October 14,
be received,
AND FURTHER THAT the staff be directed to prepare a report for the
consideration of this Committee concerning the proposed method for
acknowledgment of the assistance of the Ontario Government
CARRIED
(c) Letter dated October 25th, 1983, received from the Chief Administrative
Officer of The Regional Municipality of Peel, requesting that the
Authority enter into negotiations for the use of a piece of property in
connection with their Employment Strategies Team
Res #292 Moved by E V Kolb
Seconded by Mrs L Hancey
THAT the letter dated October 25, 1983, from The Regional Municipality of
Peel be received,
AND FURTHER THAT Mr Richard L Frost, Chief Administrative Officer, be
informed that the Author~ty is prepared to enter into discussions concerning
use of a suitable piece of Authority-owned property, in the vicinity of the
Snelgrove Reservoir s~te, ~n connection with development of a youth employment
training program by the Region's Employment Strategies Team
CARRIED
2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #293 Moved by E V Kolb
Seconded by M W H Biggar
THAT the applications listed herein as A(l) to A(7) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
A(l) Scarborough Centenary Hospital
To place fill at rear of hospital at #2867 Ellesmere Road
City of Scarborough (Highland Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) Drawing #P-3, Grading Information, prepared by Paving Consultant
Services and dated July II, 1983,
(b) Details of Proposed Gabion Walls, prepared by Paving Consultant
Services,
(c) Drawing #P-2, Site Plan, prepared by Paving Consultant Services,
and dated June 27, 1983,
(d) Landscaping Plans prepared by Baker, Salmona, Hess Limited
-3- B-397
A(2) Uniwood Homes
To construct two single-family dwellings at #27 Knigh tswood Dr ,
Citv of North York (Don River Watershed)
.
In accordance with the following documents and plans, which shall form
part of the permit
.Drawing #Al to AlO, prepared by Morton Katz, Architect, and
dated September 25, 1983.
A(3) Mr Claude Abrams
To alter watercourse, #7195 Bayview Avenue, Town of Markham,
(Don River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Plan #1 and #2, dated October 25, 1983
A(4) George & Elizabeth Traynor
To construct two additions to residence, north of Albert Street,
west of Union Street, Village of Bolton (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
The drawings prepared by Albert Settino and forming part
of the permit.
A(5) Castcar Investments Ltd
To build structure within Regional Flood plain, #1864 Kingston Road,
Town of Pickering (Duffin Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A site plan showing the location of the dwelling,
Typical sections of the new basement walls
A(6) The Municipality of Metropolitan Toronto
Parks & Property Department
To undertake erosion control and bank stab1lization works, Glen Rouge
Trailer Park, north of Highway #2, east; of Sheppard Avenue East,
City of Scarborough (Rouge River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
A location map and typical channel section prepared by the
applicant
A (7) The Pierson Group Limited
To place fill and stab11ize eroded valley wall, #2360 Weston Road
at St. Phillips Road , City of York (Humber River Watershed)
In accordance with the following plans and documents, which shall form
part of the permit
Slope Protection & Drainage Plan, Sheet #:L-2, prepared by
The Pierson Group Limited, and dated October, 1983
B-398 -4-
3 CORPORATION OF THE TOWN OF VAUGHAN
-Request for Permanent Easement north of Steeles Avenue,
west of Jane Street
Res. #294 Moved by E V Kolb
Seconded by M.W H Biggar
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of a request from the Corporation of the Town of Vaughan to grant a
permanent easement across Authority-owned lands to facilitate new industrial
development, located north of Steeles Avenue, west of Jane Street,
AND WHEREAS it is the opinion of the Authority that it is in the best interest
of the Authority, in furthering its objectives as set out in Section 20 of the
Conservation Authorities Act, to co-operate with the Town of Vaughan in this
instance,
THAT a permanent easement, containing 0 485 acres, more or less, be granted to
the Town of Vaughan to facilitate new industrial development located north of
Steeles Avenue, west of Jane Street, said land being Part ot Lot I,
Concession V, Town of Vaughan (The Regional Municipality of York), designated
as Part 1 on Plan 65R-6354, consideration to be the nominal sum of $2 00,
plus all legal, survey, and other costs,
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 2l(c) of The Conservation Authorities Act,
R S 0 1980, Chapter 85, as amended,
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
4 THE MUNICIPALITY OF METROPOLITAN TORONTO
-Request for Conveyance of Land east side Scarlett Road,
north of Eglinton Avenue
Res #295 Moved by E V. Kolb
Seconded by M W H. Biggar
WHEREAS The Metropolitan Toronto and Region conservation Authority is in
receipt of a request from The Municipality of Metropolitan Toronto to grant
conveyance of Authority-owned lands to facilitate the construction of a side-
walk on the east side of Scarlett Road, north of Eglinton Avenue, in the
City of Etobicoke,
AND WHEREAS it is the opinion of the Authority that it is in the best interest
of the Authority, in furthering its objectives as set out in Section 20 of the
Conservation Authorities Act, to co-operate with The Municipality of
Metropolitan Toronto in this instance,
THAT three small parcels, containing a total of 0 257 acres, more or less, be
conveyed to The Municipality of Metropolitan Toronto for the construction of
a sidewalk on the east side of Scarlett Road, north of Eglinton Avenue, in the
City of Etobicoke, said land being Part of Lots 16, 17, and 18,
Concession tn' , F T H , City of Etobicoke (The MuniCipality of Metropolitan
Toronto), designated as Part 1 on Plan 64R-9252, and Parts 1 and 2 on Plan
64R-9253 Consideration to be the nominal sum of $2 00, plus all legal,
survey. and other costs,
THAT said conveyance be subject to an Order-in-COuncil being issued in
accordance with Section 21(c) of The Conservation Authorities Act,
R S 0 1980, Chapter 85, as amended,
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents
CARRIED
-5- B-399
5 LAND ACQUISITION PROJECT 1982-l984 DON RIVER WATERSHED
-Property Von-Land Corporation Limited
East of Keele Street, south of Langstaff Road,
Town of Vaughan
Res #296 Moved by E V Kolb
Seconded by M W H Biggar
THAT the report (October 26, 19831 set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED.
Re Project Land Acquisition Project 1982-1984 - Flood
Plain & Conservation Land Component Don
River watershed
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property East of Keele Street, south of Langstaff Road
Owner Von-Land Corporation Limited
Area to be acquired: 32.920 acres, more or less
Recommended purchase price $32,920 00
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lots 8 and 9, Concession III, Town of
Vaughan (The Regional Mun~cipality of Yorkl, situate east of Keele Street,
south of Langstaff Road
"Negotiations have been conducted with the owner, and, subject to the approval
of your Committee, agreement has been reached with respect to a purchase
price, as follows
The purchase price is to be the sum of $32,920 00, with the dat~
of completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land free from encumbrance, w~th the exception of an existing
service easement
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"The proposed purchase has been arranged in such a manner as to be completed
during 1983 or 1984, subject to availability of funding"
6 PROPOSED HYDRAULIC IMPROVEMENT
MOUTH OF THE HUMBER RIVER
Res. #297 Moved by Mrs L Hancey
Seconded by J S Scott
THAT the Engineering Department of the Toronto Harbour Commissioners be
retained to complete design analysis, drawings, specifications, and cost
estimates, as well as to ass~st in obtaining all necessary approvals for the
proposed hydraulic improvement at the mouth of the Humber River, subject to
the following
(al The approval of Metropolitan Toronto being obtained for the use
of existing unmatched Metropolitan Toronto levy funds associated
with the Shoreline Management Programs,
(bl Approval of the Province of Ontario be obtained for the project
and for the matching funds,
(cl The City of Toronto granting to The Metropolitan Toronto and Region
Conservation Authority the necessary easements for construction and
maintenance of the proposed structure, or transfer of title to the
Authority of the lands required
CARRIED
-
B-400 -6-
7 SHORELINE MANAGEMENT PROJECT 1982-1983 SCARBOROUGH SECTOR
-Erosion Control Works Vicinity of Lakehurst Crescent
Res #298 Moved by Mrs L Hancey
Seconded by J S. Scott
THAT the Authority serve as an agent for the City of Scarborough to implement
erosion control works to protect an existing sanitary sewer in the vicinity
of the west end of Lakehurst Crescent, subject to the following
(a) The City of Scarborough enter into an appropriate agreement with
the local property owners regarding access and control of liability,
(b) The City of Scarborough agree to reimburse the Authority for all
costs incurred in relation to this project,
(c) The City of Scarborough and the Authority enter into a suitable
agreement to define the scope of the work and limit the Authority's
liability for the work
CARRIED
8 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT
-Property (a) Isabel Bayley, (b) Wells Renwick, (c) Giles W McKague,
(d) Frank S Duckworth, (e) Mary L Morris
Res #299 Moved by Mrs L Hancey
Seconded by J S Scott
THAT the Report (October 25, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
Re Project Land Acquisition Project 1982-1984 - Lake
Ontario Waterfront
Authority: Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property South side of Fallingbrook Drive
OWners (a) Isabel Bayley
(b) Wells Renwick
(c) Giles Wallace McKague
(d) Frank Samuel Duckworth
(e) Mary Lavina Morris
Area to be acquired (a) 0 446 acres, more or less
(b) 0 648 acres, more or less
(c) 1 132 acres, more or less
(d) 3 114 acres, more or less
(e) 2 636 acres, more or less
Recommended purchase price Nominal consideration of $2.00 in each
instance, plus vendors' legal costs
"Included in the requirements for the above-noted project are five
irregularly-shaped parcels of land, being Parts of Lots 36 and 37, Registered
Plan 2836, Part of Lot 34, Concession VIII, and Part of Water Lot in Lake
Ontario, City of Scarborough (The Municipality of Metropolitan Toronto),
located south of Fallingbrook Drive, in the general vicinity of Victoria Park
Avenue and Queen Street East
"Negotiations have been conducted with the owners, and, subject to the
approval of your Committee, agreement has been reached with respect to a
price, as follows
The purchase price, in each instance, is to be the nominal
consideration of $2 00, with date of completing the trans-
action to be as soon as possible
-7- B-401
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid The Authority is to receive con-
veyance of the land free from encumbrance, with the exception of an existing
service easement
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate
"This property is being conveyed to the Authority in connection with certain
erosion control works being carried out along the Scarborough Bluffs "
9. REPORT #2/83 - PERSONNEL SUB-COMMITTEE
Res #300 Moved by Mrs L. Hancey
Seconded by E.V. Kolb
THAT Report #2/83 of the Personnel Sub-Committee, as appended as Schedule itA II
of these Minutes, be received;
AND FURTHER THAT the recommendations contained therein be approved
CARRIED
10 REPORT #2/83 - FOOD SERVICES SUB-COMMITTEE
Res #301 Moved by M.W H Biggar
Seconded by: W G. Barber
THAT the agreement dated January 12, 1983, between The Metropolitan Toronto
and Region Conservation Authority and Dalmar Foods Limited, for the manage-
ment of the Authority's food service facilities, be renewed for a one-year
period, commencing March 1, 1984, and concluding February 28, 1985,
THAT the management fee stipulated in the agreement be amended to 4 25% of
net sales for the period of the renewal,
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action ~s required to give effect thereto,
including the execution of any documents.
CARRIED
11 APPOI~TMENT OF AUTHORITY MEMBER BY
THE MUNICIPALITY OF METROPOLITAN TORONTO
In accordance with the Conservation Authorities Act, R S 0 1980, Chapter 85,
section 5-(5), " the number of members appo~nted to the Metropolitan
Conservation Authority by The Municipality of Metropolitan Toronto shall, at
all times, be equal to the total number of members appointed by the other
partic~pat~ng municipalities (The Regional Municipality of Peel appointed
Councillor R Skjarum to the Authority on March 10, 1983, as the result of a
population increase entitling the Region to representation by one additional
member)
Res #302 Moved by, J S Scott
Seconded by E.V Kolb
THAT the staff report having regard to the appointment to the Authority by
The Municipality of Metropol~tan Toronto, of Mr Brian G Harrison, for the
balance of 1983 and unt~l the first meeting of the Authority after the term
for which he was appointed has expired, be received
CARRIED
B-402 -8-
12 STAFF FINANCIAL PROGRESS REPORT
-July l/September 30, 1983
In a~cordance with discussion at a previous meeting concerning the length of
the above-noted report, the Acting General Manager informed the Committee
that since the progress report is presented elsewhere, it was considered
advisable to retain the present form Mr McLean presented a summary of
each section
Res. #303 Moved by S.A Macpherson
Seconded by E. Fulton
THAT the Staff Financial Progress Report for the period
July 1 - September 30, 1983, as appended as Schedule "B" of these Minutes,
be received
CARRIED.
13 FINANCIAL REPORT AND ACCOUNTS FOR
THE MONTH ENDING OCTOBER 2, 1983
Res #304 Moved by Mrs L. Hancey
Seconded by S A Macpherson
THAT the Divisional Expenditure Summary for the period September 5, 1983, to
October 2, 1983, as appended as Schedule "CD of these Minutes, be received,
AND FURTHER THAT payment of the Authority accounts, in the amount of
$1,687,324 00, be approved
CARRIED
I
The Chairman reminded the members that the Ceremonial Sod-Turning for the
Black Creek Pioneer Village Visitor Centre would take- place a~ 3 30 p m , with the
Honourable Susan Fish, Minister of Citizenship and Culture, officiating
15 TERMINATION
On motion, the meeting was terminated at 2 10 P m , November 2, 1983
Florence E Gell W.E Jones
Chairman Secretary-Treasurer
KC
B-403
SCHEDULE flAil
TO: The Chairman and Members,
Executive Committee, M T R C.A , #18/83
FROM Mrs Lois Hancey,
Chairman, Personnel Sub-Committee
RE REPORT #2/83
PERSONNEL SUB-COMMITTEE
THE SUB-COMMITTEE RECOMMENDS:
1 THAT the position "Superintendent - Office Services" (SMl) be
replaced by two positions "Administrative Assistant - Print
and Mail Room" (G04) , and "Property Assistant" (G03),
THAT the position "Print Room Assistant" (G01) be eliminated,
THAT the Head Office lunch room facilities be under the
direction of the Manager, Food Services,
AND FURTHER THAT the Head Office reception/switchboard be
supervised by the Administrative Assistant - Senior Management
2 THAT Personnel Policy A-6 - Classification System - as amended to
(a) reflect the Personnel Officer's involvement in the
classification system,
(b) clarify. in item 2, existing practice for new ..
, positions,
(c) establish, in item 3, a new procedure for review of
positions that become vacant,
and appended as Appendix 'A' hereto, be approved
3 THAT Personnel Policy A-3 - Appeal Procedure - be amended to
include the involvement of the Personnel Sub-Committee, as
Item (c) (Appendix 'B' hereto)
24-0ctober-1983
KC
,
B-404 APPENDIX ' A'
DRAFT AMENDMENT
THE METROPOLITAN TORONTO AND REGION CONSERVATION ACTHORITY
PERSONNEL MANUAL
SECTION A - WORKING CONDITIONS Executive Mtg.
PERSONNEL POLICY A-6 Resolution No.
CLASSIFICATION SYSTEM Date
(l) The classification system shall be as described and set forth
in Schedules A and B appended.
(2) Position descriptions for new positions will be submitted to
the Classification Committee, through the Personnel Officer,
for classification.
(3) The job description and classification of existing positions
that become vacant will be reviewed automatically by the
Personnel Officer prior to posting or advertising.
,
(4) Employees who consider that their position is improperly
classified shall discuss the claim with their immediate
supervisor, who, together with the Personnel Officer, will
review the request. If further review is required, ~e
Division Administrator and/or the Personnel Officer may
request the Classification Committee to examine the claim and
make recommendations to the General Manager who will make a
final decision.
APPENDIX 'B' B-40S
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SECTION A - WORKING CONDITIONS Executive Mtg.
PERSONNEL POLICY A-3 Resolution No.
APPEAL PROCEDURE Date:
(l) Employees who have a complaint, concern or difference shall
first discuss the matter with their immediate supervisor.
(2) If the matter is not resolved, the employee may proceed as
follows in order to reach a final decision:
(a) Division Administrator;
(b) General Manager or, in his absence, a designate;
(c) Personnel Sub-Committee;
(d) Executive Committee; ~
(e) Full Authori ty.
- 5 -
B-406
- 1 - SCHEDULE ltB"
STAFF PROGRESS REPORT
Property Section
During the period July l, 1983 to September 30, 1983, the Property Section
of the Finance and Administration Division completed the acquisition of l4
new properties containing 12.180 acres. The total acreage of lands owned by
the Authority, as of September 30, 1983 is 27,858.583 acres.
During the period the Property Section spent a considerable amount of time
in the preparation, negotiation, and processing of shoreline management and
erosion control agreements. The Property Section also carried out all of
the administration management requirements in connection with Authority-
owned lands; i.e. agreements, easements, assessments, taxes, leases,
rentals, insurance, etc.
With assistance from the C.O E.D. program, we have undertaken to prepare a
complete set of deed plot maps of all Authority-owned properties in all the
watersheds in the Authority's jurisdiction, using the new metric floodline
maps. To date, mapping for the Etobicoke Creek, Mimico Creek, Highland
Creek, Duffin's Creek, Rouge River and three-quarters of the mapping of the
Don River has been completed.
A breakdown of the properties and acreages acquired by the Authority to date
is as follows
ETOBICOKE CREEK WATERSHED
Flood Control and Water Conservation:
Tota~ to date-- 67 properties acquired containing 451.734 acres;
Conservation Area
- 1 property sale during period comprising 0.696 acres;
- Heart Lake Conservation Area
- sale to the City of Brampton for road widening purposes (0.696 acres)
Total to date--10 properties acquired containing 418 l70 acres;
Total of Watershed 77 properties acquired containing 869.904 acres
MIMICO CREEK WATERSHED
Flood Control and Water Conservation
- 2 properties settled during period containing 0 590 acres;
- 1 purchase
- 1 permanent easement
- Mimico Creek Flood Plain Lands
- C.A. Davis Property, located on the east side of Royal York Road, south
of G1enroy Avenue, City of Etobicoke. (1 purchase; 1 permanent easement)
Total to date--49 properties acquired containing 9l.956 acres;
- 2 expropriations outstanding (permanent easements)
Total Watershed: 49 properties acquired containing 9l.956 acres.
B-407
- 2 -
HUMBER RIVER WATERSHED
Flood C~ntrol and Water Conservation
- 9 properties settled during period containing 1.670 acres;
- 4 purchases
- 5 permanent easements
- Humber River Flood Plain Lands
- G. and B. Goodfellow Property, located on the north side of Mill Street,
Bolton, Town of Caledon. (l purchase; 1 permanent easement)
- Regional Municipality of Peel Property, located on the east side of
Highway i50, Town of Caledon (permanent easement)
- A.D. McFall Property, located on King Street East, Bolton, Town of
Ca1edon (permanent easement)
- M E. Nicholson Property, located at the rear of 5670 Kirby Sideroad,
Town of Vaughan (permanent easement)
- E. Goodfellow Property, located on the north side of King Street,
Bolton, Town of Caledon (1 purchase; 1 permanent easement)
- Corporation of the Town of Caledon Property, located on the west side of
Humber Lea Road, Bolton, Town of Caledon
- L. and J. Schlechter Property, located at 268 King Street East, Bolton,
Town of Caledon.
- 1 property sale during period comprising 0.049 acres
- Sale to A.D. McFall in a land exchange. (0.049 acres)
Total to date--80l properties acquired containing 8,583.301 acres;
Conservation Areas
Total to date--79 properties acquired containing 4,305.773 acres;
Forest and Wildlife Areas
Total to date--lO properties acquired containing 786 486 acres;
Agreement Forest Lands
Total to date--23 properties acquired containing l,865.745 acres;
Niagara Escarpment Lands:
Total to date--4 properties acquired containing 25l.926 acres;
Total of Watershed 917 properties acquired containing 15,793.231 acres.
DON RIVER WATERSHED
Flood Control and Water Conservation
- 1 property settled during period containing 0.l03 acres;
- 1 purchase
B-408
- 3 -
DON RIVER WATERSHED contd.
- Don River Flood Plain Lands
- Greenway Homes Limited Property, located on the west side of Leslie
Street, south of Steeles Avenue, City of North York
Total to date--l9l properties acquired containing l,955.l37 acres.
- 4 expropriations outstanding (1 permanent easement)
Conservation Area
Total to date--l property acquired containing 9.350 acres;
Total of Watershed: 192 properties acquired containing 1,964.487 acres.
HIGHLAND CREEK WATERSHED
Flood Control and Water Conservation:
Total to date--143 properties acquired containing 823 911 acres;
Conservation Area:
Total to date--2 properties acquired containing 118.626 acres;
Total of Watershed 145 properties acquired containing 942.537 acres.
.
I
ROUGE RIVER WATERSHED
Flood Control and Water Conservation
- Rouge River Flood Plain Lands
- 1 correction. On September 16, 1981 the Authority acquired a Flooding
Easement only from Allstate Insurance Company of Canada over 20 000
acres of land in the Town of Markham. This correction removes the
20.000 acres from our land acquisition total, as we are not including
Flooding Easements in our ownership figures.
Total to date--l21 properties acquired containing 2,089.339 acres;
Conservation Area
Total to date--2 properties acquired containing 267 038 acres;
Total of Watershed: 123 properties acquired containing 2,356.377 acres.
-
B-409
- 4 -
DUFFIN'S CREEK WATERSHED
Flood Control and Water Conservation
- 1 property sale during period containing 0.244 acres;
- Duffin's Creek Flood Plain Lands
- sale to the Regional Municipality of Durham for road widening purposes.
(0.244 acres)
Total to date--90 properties acquired containing 905.423 acres;
Conservation Area:
Total to date--19 properties acquired containing 1,076 568 acres;
Forest and Wildlife Area
Total to date--16 properties acquired containing 1,749 696 acres;
Agreement Forest Lands
Total to date--l property acquired containing 93.000 acres;
Total of Watershed 126 properties acquired containing 3,824.687 acres
PETTICOAT CREEK WATERSHED
Flood Control and Water Conservation:
Total to date--l property acquired containing 22.139 acres;
Conservation Area
Total to date--l property acquired containing 177.918 acres;
Total of Watershed: 2 properties acquired containing 200.057 acres
LAKE ONTARIO WATERFRONT
Waterfront Plan
- 2 properties settled during period containing 9.817 acres;
- 2 purchases;
- Scarborough Sector
- G. Schwarzkopf Property, located on the south side of Lakehurst
Crescent, in the Birchmount Road area, City of Scarborough.
- Municipality of Metropolitan Toronto Property, located on the south side
of Copperfield Road, east of Manse Road, City of Scarborough.
- 1 property sale during period comprising 0.340 acres;
B-410
- 5 -
LAKE ONTARIO WATERFRONT contd.
- Scarborough Sector
- sale to the Municipality of Metropolitan Toronto to facilitate access to
the Easterly Filtration Plant, and as part of a land exchange. (0.340
acres)
Total to date--28l properties acquired containing 1,765.917 acres.
Conservation Area
Total to date--9 properties acquired containing 49.430 acres;
Total of Lake Ontario Waterfront:
290 properties acquired containing l,815.347 acres.
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
July 1 - Sept. 30, 1983 - 12 properties settled containing 2.363 acres;
(- 6 purchases;
- 6 permanent easements
- 3 property sales
Total .to date--l,463 properties acquired containiing 14,922.940 acres;
- 6 expropriations outstanding
CONSERVATION AREAS
July 1 - Sept. 30, 1983 - 1 property sale
Total to date--123 properties acquired containing 6,422 873 acres.
FOREST AND WILDLIFE AREAS
July 1 to Sept.30, 1983
Total to date--26 properties acquired containing 2,536.182 acres.
AGREEMENT FOREST LANDS
July 1 - Sept. 30, 1983
Total to date--24 properties acquired containing 1,958.745 acres
NIAGARA ESCARPMENT LANDS
July 1 - Sept 30, 1983
Total to date--4 properties acquired containing 251.926 acres.
B-411
- 6 -
SUMMARY contd.
WATERFRONT PLAN
July 1 - Sept. 30, 1983 - 2 properties settled containing 9.817 acres;
(- 2 purchases)
- 1 property sale
Total to date--281 properties acquired containing 1,765.917 acres.
GRAND TOTAL OF ALL PROJECTS
July 1 - Sept. 30, 1983 - 14 properties settled containing 12 180 acres;
(- 8 purchases;
- 6 permanent easements;
- 5 property sales
Total to date--1,921 properties acquired containing 27,858.583 acres;
(11,274.369 hectares)
- 6 expropriations outstanding
<
1983 10.20
DO em
B-4l2
To The Chairman and Members of the Executive Committee, M.T R.C A
From: Mr R. K. Cooper, Administrator, Historical Sites Division
Re Progress Report - July 1 to September 30, 1983
HISTORICAL SITES PROJECTS (Development)
In late September Mitchell Construction began the excavation work
for the Black Creek Visitors Centre. M.T R.C.A. staff removed all fenCing
and trees in the construction area.
A basement has been completed for the Tinsmith/Hardware Store and
a framework for the building has been erected.
The concrete lower floor of the Sawmill has been poured.
HISTORICAL SITES PROJECTS (Operations & Maintenance)
(a) Registration and Artifacts
During the third quarter of 1983 Black Creek received forty-one
items from nineteen donors. A notable donation was an early wooden pump
and pipe manufactured in Claremont, Ontario.
The Registrar's Department received instruction from the Conser-
vation Co-ordinator of the Ministry of Citizenship and Culture on the treat-
ment of iron artifacts The C.O E D worker assisting the Registrar has
successfully treated a number of iron agricultural implements as a result
of this training
The stonepuller was repaired and painted. The forges in the
Carriage Works were repaired and made operational
The Registrar continues to have the capable assistance of a volunteer
one dcty a week
(b) Publicity and Promotion
A Promotions Officer for the Village, Neil Beaudry, started working
in the Historical Sites Division on July 4, under the direction of the
Curator
Already considerable attention has been given towards developing
lists of target audiences, to whom appropriate information about Village
special events can be directed. The identification of prospective clients
for Black Creek is one of the most important marketing tasks at hand. This
effort will continue over the next few months as we strive to discover groups
of people with similar needs that we can satisfy
To promote the special event "Family Fun" held on weekends during
August, an ad was placed on the CITY KIDS poster which was widely displayed
throughout subway stops, libraries and community centres
Village staff participated in the first annual "Flax Festival",
August 11 - 14, which was sponsored by the Red Cross and held at York
University A demonstration of flax spinning was carried out and half-price
admission coupons to the Village were distributed to visitors.
On August 24 and 25 the Toronto-based theatre group "Meanfeat"
performed in the Village. Their production of "The Good Woman of Setzuan"
was enjoyed by visitors, confirming the need for more live theatrical and
musical performances at the Village to increase visitation by families and
senior citizens
Historical Sites staff attended a meeting of Toronto museums at the
office of the Metro Toronto Convention and Visitors Association, to explore
the possibility of participating in a co-operative ad in MTCVA's consumer
guide gook "Happening" (circulation 800,000) As a result, Black Creek
will be featured in a full-colour, high-impact ad promoting several Metro
museums This ad will be issued four times during 1984.
~
B-413
- 2 -
Neil Beaudry visited the MTCVA offices again in early September
to spend an afternoon with travel/trade planners, discussing the many
opportunities available for Black Creek to attract additional visitation
from motorcoach tour operators in 1984.
Black Creek entered into agreements with Holiday Inn, Tourism
Canada, Great Lakes Hostelling Association, Toronto Life Magazine, and the
Continental Bank, to participate in high-calibre programs offering reduced
admission to the Village The overall effect of this kind of marketing
program will be assessed at year end
Neil Beaudry visited the offices of the Community Information Centre
of Metropolitan Toronto to discuss opportunities for Black Creek to promote
special events to their clients This resulted in extensive mailing lists
of various community groups, service clubs, seniors clubs, youth and
children's organizations being made available.
Another meeting with the City of North York's Director of Public
Information provided other valuable distribution lists, to facilitate
efforts in targeting information on specific Village programs to special
interest groups. Moreover, this contact will prove to be very important
in terms of planning special events at Black Creek for local residents.
Regular communications with this office will be maintained.
Lor~aine O'Byrne and several Village interpreters were interviewed
on-site by CBC's Metro Morning personalities, as part of a feature segment
highlighting this year's "Pioneer Festival"
A feature article on the Village was written for the City of North
York Development Office as part of a special eight page insert to the
Financial Post, promoting North York It is due for release sometime in
November.
Black Creek staff promoted Village special events at the Ontario
Travel Information Kiosk, Toronto Eaton Centre and Sherway Gardens Shopping
centre.
During the third quarter of 1983 the Village was the location for
a number of commercial photography productions Segments of a movie telling
the story of Tom Longboat and scenes for a new Imax feature to be shown at
the Ontario Place Cinesphere were filmed in the Village: CFTO-TV recorded
an episode of the children's program "Welcome To My World": the Ontario
Ministry of Natural Resources' photographed a portion of a forestry
documentary, and Sears used Black Creek as an outdoor location for a
fashion layout
The Village received newspaper coverage during June, July and August
from the three Toronto dailies, as well as from many of the area weeklies.
Russ Cooper attended the Heritage Canada Conference in September
and also gave a talk to the east York Historical Society. Similarily,
Jeanne Hughes spoke to a group of teachers at York University and later
gave them a conducted tour of the Village Mrs. Hughes also gave lectures to
regional museum committees in Thunder Bay and Renfrew, Ontario, re "Preparing
For The Bicentennial"
(c) Special Events
To ensure our visitors are getting the most from their visit to
Black Creek, as an added bonus to their regular admission, a large number
of special events were held during July, August and September
(i) The annual Muster Day was held on July 1st Black Creek's Honorary
Reeve, The Honourable Pauline McGibbon, officiated at this popular event.
(ill The Victorian Family Picnic was the theme for July weekends with a
variety of participation activities, such as races, stilts, and hoops, which
were offered for the visitors.
(iii) During August weekends the emphasis in "Family Fun" was also on
participation with a variety of 19th century games, such as croquet, quoits,
and battledore and shuttlecock available for visitor involvement.
(iv) The "Corn Fest" was offered to visitors on most weekends in September,
and featured corn-on-the-cob for sale, and demonstrations of cooking with
corn, corn cob animal-making, and corn husk doll-making
(v) The 5th annual "Outdoor Hymn Sing" attracted its usual strong participation
from seniors and religious groups in the Metro region.
B-414
- 3 -
(vi) Over 4,500 people attended the 27th annual "Pioneer Festival" on
September 17th. Inclement weather on ~he morning of the event may have
contributed to the decline in attendance this year
(vii) Black Creek's 2nd annual "Honey Fair" although dampened by rain, pro-
vided visitors with many fascinating demonstrations of bee-keeping techniques
A very successful addition to this year's program was the refreshment tent
operated by staff, and providing visitors with an opportunity to relax and
enjoy a cup of hot tea along with biscuits and honey This was a good
example of the kind of added service to visitors which can also provide
increased revenues to the Village.
During the third quarter of 1983, 22 weddings, 18 wedding receptions,
and 1 banquet were held.
(d) Building and Grounds Maintenance
Through the summer, regular maintenance has been carried out with
the assistance of the C O.E D. staff
Burwick House and Flynn House have been repainted The porch at
Laskay Emporium has been repaired and painted The smoke House roof was
reshingled Several of the gates to Village homes have been weighted to
close automatically
The busy schedule of special events has meant a correspondingly busy
schedule of grounds maintenance. Extra preparations and clean-up were
carried out for Festival, the Honey Fair and the Hymn Sing.
Construction work at the Tinamith/Hardware and the Visitors Centre
has necessitated the installation of temporary hydro lines at the Village
entrance. The portable has been cleared out for use by the construction
company
An exhaust fan has been installed at the Snack Bar Several furnaces
were cleaned, shelves were installed in the Print Shop basement, a new floor
was built for the stake truck box, and the rear brakes were replaced on the
wagon.
A backhouse was moved in from Whitchurch Township for use at the
Doctor's House The Peel Regional Police Association donated a shed to
Black Creek. The shed from near Norval was dismantled and brought in for
re-erection at the Sawmill.
eel Livestock
During the summer a cow was purchased, a calf was born and a pure-
bred Clydesdale colt was born Two ewes and seven lambs were sold.
EXPENDITURE AND REVENEU STATEMENT
JULYl TO SEPTEMBER 30, 1983
EXPENDITURE
HISTORICAL YEAR % OF FORECAST
SITES PROJECT TO DATE BUDGET TO
{DEVELOPMENT l EXPEND. BUDGET USED DEC.31/83
232,924 l,995,000 11 7 600,000
HISTORICAL
SITES PROGRAMS YEAR % OF FORECAST
(OPERATIONS & TO DATE BUDGET TO
MAINTENANCE l EXPEND BUDGET USED DEC 31/83
1,242,630 1,760,322 71 1,645,000
REVENUE
1983 RECEIVED % OF INCOME
PROGRAM BUDGET SEPT. 30/83 RECEIVED
1,487,200 821,982 55.3
B-4l5
- 4 -
FINANCIAL COMMENTS
Village attendance to the end of September was 167,673, down
40,587 from 1982. Correspondingly, gate revenues are down by $70,301; gift
shop revenue by $25,817; and Village outlets by $23,034 Very hot, hmnid
weather was prevalent throughout the summer months which had many visitors
and residents seeking water-based activities, or air-conditioned buildings
In general, several other major attractions in the Metro Region such as the
Ontario Science Centre, the McMichael Canadiana Collection, CN Tower, and
Casa Lorna were experiencing relatively high decreases in attendance from
1982 Competition amongst tourist attractions in the Metro Region is fierce,
and the big theme parks (i e. Canada's Wonderland, C N E. and Marineland &
Game Farm) were all doing increased business over 1982
The number of citizens to date in 1983 is 401, compared to 409 at
the same time in 1982
The ever popular Dickson Hill School Program recommenced in
September and by month's end had 525 participants in a total of 3 classes.
At present there exists a two year waiting list for participation in this
program.
~
1983.10 25
B-416
TO The Chairman and Members of the Executive Committee - M.T.R.C.A.
Meeting tlB/B3 - Wednesday, November 2, 1983
FROM: T. E. Barber, Administrator, Information and Education Division
RE INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT
July 1 - September 30, 1983
CONSERVATION INFORMATION SECTION
The Conservation Information Section carries out the Authority's general
information program, as well as programs relating to the resource
management activities and the marke~ing of the Authority's revenue
generating facilities - Black Creek Pioneer Village, the Kortright Centre
for Conservation and the Conservation Areas, in addition to the marketing/
communicaeions enhancement program funded by the Canada/Ontario Employment
Development Program.
COMMUNITY RELATIONS - INFORMATION - GENERAL
Printing Highlights:
- during this period, staff members put a special emphasis into a mass
distribution campaign of the Authority's General Brochure and the
1983 Calendar of Events and Activities, as well as promotional brochures
on the Conservation Areas, Black Creek Pioneer Village and the Kortright
Centre for Conservation
- a special news release was printed and distributed, regarding the
Authority's reforestation programs.
Tours and Special Davs:
- staff made arrangements for the Glen Haffy Fishing Day, July 14, 1983
- preliminary arrangements have now been made to take The Honourable Alan
Pope, Q.C., Minister of Natural Resources, on a tour of the Authority's
facilities, on October l4, 1983
- a number of meetings have been held regarding the Official Opening of
the Bolton Flood Control Channel, on October 14, 1983
- staff worked on a special Donors' Day, which was held at Black Creek
Pioneer Village, on September 24, 1983
- Andy Watson, M.P P , Parliamentary Assistant to The Honourable Philip
Andrewes, Minister of Energy, officially opened the Kortright Renewable
Energy Theme on Tuesday, September 27, 1983. Staff made arrangements
for the official ceremony and the receptio" which followed
Special Programs:
- staff spent extensive time working with the Foundation on their
special fund-raising campaign for the Visitors Centre
- staff attended a meeting, called by Scott Somerville, Administrator of
the Town of Vaughan, held at the McMichael Canadian Collection on
August 18, 1983. All tourist attractions, Chambers of Commerce and
York Region representatives were invited to discuss the feasibility of
developing an awareness of the Town of Vaughan.
Audio-Visual ~ighlights
- staff prepared an audio-visual presentation, for the Visitors Centre
Special Campaign Committee of the Foundation, which was shown on
September 19, 1983
- staff prepared a major slide presentation that was presented to the
Authority's Review Committee in July
-
B-417
- 2 -
COMMUNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT
Printing Highlights
- distribution continues of the Valley and Stream Regulations and the
Waterfront Regulations, and French translations are available. They
have been delivered to municipal offices and consultants, and have also
been distributed at the mall promotions.
Audio-Visual Highlights:
- staff prepared an exhibit on watershed planning that will be used by
the Ministry of Natural Resources for the next couple of months.
COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING
Printing Highlights
- mass distribution continued during this period of the Black Creek
Pioneer Village Brochure, Conservation Area Map, Calendar of Events,
General Brochure, flyers on all different programs, and posters, and
was carried out by Experience '83 staff and C.O.E.D staff
- Pioneer Festival posters (500) and flyers (25,000) have been printed,
and distribution is underway
- the posters promoting Black Creek, Kortright and the Conservation
Areas have proven to be very popular, as distribution continues
throughout the watershed. The Black Creek Pioneer Village poster
was displayed in the Liquor Control Board of Ontario outlets in the
.. region, and a similar complimentary program will take place, throughout
September, for the Kortright Centre for Conservation.
- Brochures Unlimited continues to distribute the Black Creek, Kortright
and Conservation Area Brochures in the Metro region, and throughout the
Niagara Peninsula in the case of the Black Creek and Kortright
Brochures
- since May, an Authority enclosure has been sent out with the Ci ty of
North York's water bills. This program concluded in mid-September.
- staff prepared and distributed 14 news releases, 1 photo release,
l4 synopses and 12 flyers, identifying and promoting programs at the
Village, Kortright and the Conservation Areas, as well as 3 special
profiles on Black Creek and Kortright staff
- the Authority subscribes to the MacLean Hunter Press Clipping Service
and, for this period, received approximately 665 press clips, which is
only a sample of the coverage the Authority receives
- printing of 20,000 copies of the Wintertime Good Times brochure
(distribution is underway).
Special Programs
- staff attends regular meetings of the Attractions Council of the
Metropolitan Toronto Convention and Visitors Association, as well as
the Executive Meetings
- considerable work and planning went into developing the Visitors
Survey. The summer portion of the survey has been completed and the
material is being key-punched by staff.
- the telephone answering sales program on evenings, weekends and holidays
has proven to be very successful As a result, this program will
continue for the rest of the year, on weekends and holidays only.
Since April, a total of 10,167 calls have been serviced.
- Teleguide units have been installed at Black Creek Pioneer Village, the
Kortright Centre, Indian Line Tourist Campground and the Head Office,
and there have been a number of meetings with Infomart to discuss the
1984 programs
- the multilingual television station, Channel 47, promoted the
the Authority's recreational facilities during the summer This was
a Contra deal, with the Authority providing family passes in return for
television promotions
- the word processing equipment is now being used to enhance the
marketing of our facilities and programs.
B-418
- 3 -
Audio-Visual Hiahlights:
_ fall television promotions were sent to all the Southern Ontario
television stations, promoting Black Creek, Kortright and the
Conservation Areas
_ arrangements were made and exhibits were set up at
- Royal Bank Plaza
- Shopper's World (Albion)
- Bridlewood Mall
- Yorkda1e Shopping Centre
- Westwood Mall
- Sherway Gardens
- Mississauga Square One
- Bramalea City Centre
- Milton Mall
as well as at the Flax Festival, York University, in conjunction with
Black Creek Pioneer Village.
Advertising and Promotion
- arranged for special publicity features with:
a) Canada Century Home
b) Metropolitan Toronto Convention and Visitors Association -
Happenings (bi-month1y)
c) York University Athletic Calendar
d) Woodall's Tenting Directory
e) Trailer Life's Directory
f) Around Canada's Wonderland
- brochures have been distributed at Ontario Ski Shows, as per an
agreement with the Ontario Ski Council.
Canada/Ontario Employment Development proaram:
The Authority's Marketing/Communications Program has been substantially
enhanced with the hiring of one Project Coordinator and five staff
members under the Canada/Ontario Employment Development Program. These
employees are carrying out an extensive Visitors Survey at all of the
Authority's facilities and have recently been distributing literature,
posters and flyers, throughout the watershed, promoting the programs and
facilities. Program staff are also assisting with the telephone
answering service, and are working with Woods Gordon personnel in data
collection.
CONSERVATION EDUCATION SECTION
Kortright Centre for Conservation
_ general pUblic summer attendance was down slightly from last year, but
the group program attendance increased over the same period in 1982
- a reception was held in early July to mark the opening of the widlife
art exhibit by Michael Dumas; during August and September the
"Kaleidoscope of Crafts" exhibit, composed of works from Community
Colleges and sponsored by the Ontario Craft Council, was on display
at Kortright after a successful showing at the World University Games
in Edmonton
- of all the resource-related programs offered, the Bee Program is the
most popular, followed by programs about insects and the regular
nature hikes: in September there is the Honey Festival, Moccasin Walk
and a special wine-making program
- special functions during the summer included several wedding receptions,
evening meetings. A small ceremony to mark the official opening of the
Renewable Energy Theme Program and the arrival of the 10,000 watt
horizontal axis windmill was held on September 27, 1983, co-hosted by
the Ministries of Energy and Natural Resources and the Authority, with
Parliamentary Assistant Andy Watson officiatin~
. 4 .
B-419
- 4 -
- thanks to a variety of government sponsored, labour-intensive programs
and funds raised by the Foundation and the various Ministries, several
projects are currently under development or just completed - a forestry
path with self-guiding trail using tape players, several slide presen-
tations, permanent seating in the theatre/seminar room, and a proposal
under consideration for a self-guiding mechanism for all trails.
Self-guiding mechanisms provide for greater efficiency at reduced
labour costs, but much the same level of program
- the Energy Theme Program has now completed the initial energy trail
construction and the installation of solar thermal coolers and a grid
connected 1,200 watt photovoltaic array, to provide energy to a
residence on site
Day Programs - Black Creek Pioneer Village:
- Black Creek Education staff provided a six week program during July
and August as one of the Canadian Studies component of "Discovery
S ununer '83" - a summer mini university for 10-14 year olds conducted
by York University. 401 students attended in total and enjoyed an
excellent participatory program
Program informational material has been sent to the School Boards as
well as to man~ independent schools in the area, to coincide with the
commencement of the academic year
- Scarborough and Metro Separate Boards of Education have once again
booked large blocks of time for their students in both the Pioneer
Life Prograffi and the Educational Tours. Generally, the celebrations
of Ontario's Bicentennial and Toronto's Sesquicentennial will give
added impetus to all the programs
- the Trip in Time program, in conjunction with York University, is
gearing up for another year with an increased number of topics and
hence a linkage with new departments
- plans are underway for the orientation and training of new volunteers
for the Pioneer Life Program. The volunteer complement for this
school year will be 15 in number
Residential Field Centres - Albion Hills, Boyd, Claremont, Lake St George
Summer Programs
- 3 week senior secondary level credit courses in Archaeology at Boyd
(sponsored by the North York Board) and in Environmental Studies at
Lake St. George (Toronto Board sponsored)
- York University 3 week third year Geography credit. course at Albion
Hills
- March of Dimes 5 week summer camp for disabled adults at Albion Hills
and Claremont
- 5 weeks of residential courses for English as a Second Language (E S L )
students and 4 weeks of Art and Nature courses for junior/intermediate
students - all sponsored by the North York Board
- Peel Regional Police 5 day safety training course for crossing guards
at Albion Hills
- Canadian Ski Patrol leadership training course at Claremont
5
B-420
- 5 -
Canada/Ontario Employment Development Program
Participation in the C.O.E.D. Program has, to-date, resulted in the
completion of the energy house, the continued construcion and maintenance
of trails, continued development of forestry projects and the complete
staining and painting of the main building at Kortright
Other projects within the C.O.E.D. Program include rebuilding of outdoor
stone stairs at the Boyd Conservation Field Centre and provision of a
second shift of workmen for a ten day period, to assist in the complete
renovation of the main student washrooms at the Albion Hills Conservation
Field Centre. Construction of a new roof is also in progress at Albion
Hills.
At Lake St. George, the completion of the waterfront project (dock,
boathouse, canoe storage, campfire facilities and landscaping was
accomplished under C.O E.D.
Etobicoke.Environmental Education Centre - Albion Hills
Construction is progressing, with the completion date scheduled for
early March, 1984.
FINANCIAL COMMENTS
All programs are forecasted to be on target at the present time, with the
exception of Operations and Maintenance at the Kortright Centre for
Conservation.
Attendance at Kqrtright is forecasted to be down by approximately 3,000
visitors from the 1982 figures. This Centre may, at best, break even on
Operations, and at worst have a deficit of $12,000, depending on attendance
and revenue during the last quarter of the year.
It is anticipated that any deficit that may occur will be offset within the
Division by either surpluses or unexpended funds
TEB/mrp
1983 10 26
,.
-, CD ,
I i
I .e.
, N
I
!-' ,
I
I I
I I
J ----
"':
)- OPERATJNQ STATEPlENT PAQE II
10 8Y PROQRAtt PERIOD ENDI~ 831002 REP: 109
')
ItJI E X PEN D I T U RES REVENUE I
~
- ----- -
......c................__..~.....___..__......._____. .......-..........................~--
"-T-D Y-T-D " .U.I~ tt-T-D Y-T-D "
'l 8UDQET ACTUAL ACTUAL EXP IIllnoET ..r...w.. .r:TU_~gD
...-- --.. -.-.- -- ---... ...-- --- --- ---
INFOR"ATION . EDUCATION
'l ----..........-........ ------
~~iNISTR~TION~-i . E 4111.370 29.660 279.3b2 67 3 136.008 41110 370 240- 1
~ COI'1ItUNITY RELATIONS - INFORM BO. 127 3.003 ll6.BOl 33.11 113.326 BO. 127 0
1ft ClJI'W1UNlTY RELI'ITlDHII - I~ORM 11.000 1 . 0116 9.9 9.914 11.000 0
~
~ ---- -- ----- --
COI'll'IUNITY R,ELATlONS - INFORM 90.243 3.714 72.917 SO. 8 17.326 9().243 0
:) ,..IELD CENTRE - OPERATIONS 1.273.083 96.962 883.701 69.4 389.383 1.273.083 61.1~ 7411.889- 118.6
KORTR I QHT 442.000 31.212 314.324 71 1 127.676 442.000 111.282- 168. 343- 38.1
::) --- - - - --- -
CONSERVATION EDUCATJDN-DEVELO 114.800 2.722 2,722 2.4 11 2. 078 114.800 0
, ---------------------------------------------------- -------------------
;II TOTAL 2.426.623 167.273 1. 1180. 913 611.2 8411.710 2.426.623 76.3'15- 914,471- 37 7
::J - - -
~ERAHCE'S ARE NOT INCLUDED I~ THE ACTUAL
;)
KORTRIGBT - RENEWABLE
ENERGY THEME PROGRAM $183.493 149.900 8U 33,593
J , -- -----.
.Does not inolude Municipal Levy, Provinoial Grant and interest on the Growtb Endowment Fund (9 months of the year)
\U
~
-
B-422
TO THE CHAl:RMAN AND MEMBERS O;F THE EXECUTJ:VE COW1:I:TTEE,
M.T R.C.A. - Meeting U 7/83
FROM: MR J C. MATHER, ADMINISTMTOR, WATER RESOURCE DrVISION
RE WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY 1, 1~83 TO SEPTEMBER 30, l~83
.
The attached progress report is presented for the period July 1, 1983
to September 30, 1983 The report details Doth the physical and financial
progress of the various programs and projects in the Flood Control and
Waterfront Sections Also included is a status report on the Fill
Violations as prepared by the Development Control Section
Attachments
1983 10.26
JCM/md
CD J
~
I -0l-
"'"
- w
OPERATING STATEMENT PAGE 2 10
3Y PROGRAM PERIOD ENDING 831002 REP 109
E X PEN D I T U RES REV E N U E
---.
;~c===:=;=================~========~=====~c=~=====-== =~==Q===~=~~=~=======R=C====~=========~
M-T-D Y-T-D ;, FUNDS H-T-D Y-T-D ;,
BUDGET ACTUAL ACTUAL EXP
- ---- __ =4E_ ===:;:::u= -=- -==-==-== C:~=_== -= === =__ z:z= ===;:1 'I
,
~A1ER RESOURCE - FLOOD CONTROL
=~====:_======================
ADNINISTRATION-FLODD CONTROC- 743,652 56, 167 586,690 78. 9 156,962 743,652 8,315- 1 1
METRO EROSION CONTROL 396,000 40,283 220,206 55. 5 176,294
YORK - EROSION CONTROL 23.500 254 10,375 44 2 13, 125 23, 500 1,400- 6 0
Pc~L - EROSION CONTROL - -- -- -- 35, 600- -- 0 35,600 35,600 0
DURHAM - EROSION CONTROL 5.000 0 5,000 5.000
PLANNING AND REMEDIAL MEASURE 1, 343, 500 168,279 720,737 53. 7 622,763 1,343,500 0 ' I J j
)
RIVER FORECASTIN~dp 8< MAIN 119,637 7,734 75,620 63. 2 44,017 119,637 0
S/"lALL DAMS, CHAN. &: ER CONT 244,000 26,480 193,757 79 4 50,243 24 , 1
----------------------------------------------------- -----------~---------------------------
TOTAL 2,911,389 _ ~9,!! ! 97 _ 1~ ~Q11 385 __1l~~.l.d_Q~..QQ9---2~UL3B9 6. 190- 43...805=----1_ 5
- -- ---- -- - ----
------------------------------------------------------ ---------------------------------------
ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL
, ,
"
_.---~- --- - - - - -- - - )
--. -.
)
- -- - ------ - - -
I
l'
~
\
BY PROORAM PERIOD ENDING 831002 REP 10""
, --
E X PEN D I T U RES REV E N U E --.
- - -- ----- ----
C==D.a~mzc~=~=_a.C=_~~G~a==a.~~a.~=..CG=m~=.C_O==Dg.Q ..~_Cg_~_..GG.aG___aa_.a.__D.c..a.c_c.m
M-T-D Y-T-D " FUNDS M-T-D Y-T-D "
BUDGET ACTUAL ACTUAL EXP AVAILABLE BUDGET ACTUAL ~AL RJ:'r.n )
_CI:8a= ._.a~D ...sm_ .... ClDmac.mlll'D ca....G ____0. __:aaI:aQ a;;::Ia:a I .
WATER RESOURCE - WATERFRONT
=~=__~:m~...g._.D_g__a_aaa_ -- ----
ADMINISTRATION-WATERFRONT 211,239 23,642 169,765 80 4 41,474 211,239 3'1- 2
CAPITAL DEVELOPMENT I,D31,261 97,4'2 847,786 '5.4 683,475 1,531,261 3.950- 35,270- 2.3
SHORELINE MANAGEMENT 582,500 17,749 28,071 4 8 554,429 582,500 0
--- --
MAINTENANCE 0 0
----------------------------------------------------- ---------------------------------------
TOTAL 2,325,000 138,843 1.045,623 45.0 1,279,377 2,325,000 3,950- 35,621- 1 5 J
----------------------------------------------------- --------------------------------------- ---
--ENCUMBERANCE'S ARE NOT INCLUDED IN THE ACTUAL -- ---- - - - -- ---
- -- --- --~ ----
~
--- - - ---- - - --- ---
--- ------- ----
I ~
- - - - -------
i
CD
I
01>-
IV
01>-
-- --- - - --
I
-- ---
B-425
- 2 -
FLOOD CONTROL
Erosion Control Metro
Major remedial works have been completed at the Wynford Heights Crescent
site in the City of North York
Private revenues in the amount of $27,900 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditure for this activity
Major work at Beaucourt Road has been completed Major work at Delroy
Drive on the Mimico Creek is scheduled to commence by the middle of
October, 1983 and be completed before the end of the year
Erosion Control - Peel
Remedial work at Albert Street in Bolton is scheduled for later this
year
Erosion Control - York
Remedial works at Kirby Sideroad have been completed.
Private revenues in the amount of $1,400 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditures for this activity
MAINTENANCE
Major maintenance in the Lower Humber Channels has been completed The
rehabilitation of the palgr.ve Dam is in progress
Regular maintenance of our water control structures has been carried
out within the established budget guidelines
PLANNING AND REMEDIAL MEASURES
Remedial Works
Channel improvement works have been in progress on the Main Branch of
the Humber River in Bolton Work for the Phase I of the Bolton Project
has been completed
The contract for Phase II of the Bolton Project was tendered and awarded
to Sonterlan Construction Corporation Work is now in progress and
will be completed by the end of the year
Erosion control remedial works have been initiated on the Highland Creek
as outlined in the Highland Creek Project 1983 Work on the first site
has been completed while work on the second site is in progress
Keating Channel Study
The Keating Channel Environmental Assessment report has been formally
submitted to the Ministry of the Environment for their review
Environmental Planning
Collection of background data for input into Master Drainage Planning
is ongoing The land use map has been updated to reflect 1983 status
A detailed examination of flood susceptible areas is underway Field
studies are complete for the Environmental Inventories for the erosion
control program Reports will be drafted in the near future
/3
- 3 - 8-426
WATERFRONT
==========
Colonel Samuel Smith Waterfront Area
- Landfilling commenced on June l, 1983 but progress is behind schedule
due to limited constructxon act~vity. To the end of ~eptemDer, a total
of 7,410 loads of material have been received and l.06 hectares of land
have been created
- The 1andfil1ing program for the winter months is under review with the
Ministry of the Environment.
- The number of names on the waiting list for moorings now totals 133,
an increase of 8 over the reporting period
- The City of Etobicoke, Humber College and the Ministry of Government
Services are all involved in a planning review of the future of the
Lakeshore Psychiatric Hospital
- Detail planning of the final park layout is continuing in conjunction
with Metro Parks Department and Humber College.
- Acquisition of the Provincial Crown Waterlot is proceeding
Humber Bay West .
- Landscaping around the new launching facility is complete
- The Boating Clubs are continuing with plans for their clubhouses and a
building permit has been issued for immediate construction on the
Mimico Cruising Club's building
- A master plan amendment to increase the mooring capacity from 500 boats
to 700 boats is under consideration by Metropolitan Toronto and Etobicoke.
- A clean up of debris in the mouth of Mimico Creek was completed
- Minor deficiencies throughout the site are being rectified in preparation
for final transfer of the entire site to Metropolitan Toronto
Western Beaches
- The recent concern about water quality along Metro beaches -has sparked
renewed interest in the Authority's development program and in particular
the hydraulic improvement at the mouth of the Humber River Discussions
are underway with Metropolitan Toronto regarding early implementation of
the hydraulic improvement
Aquatic Park
- The legal survey delineating the various property transactions that are
to take place is expected to be complete by November 1, 1983
- The Aquatic Park Planning Task Force is establishing guidelines for
public participation in the planning exercise
- Progress on the construction of the endikement has been slower than
anticipated, however a total of 1.39 hectares of land has been created
in 1983
Ashbridge I s Bay,
- The detailed planning of dredg~ng works required for 1984 is underway-
in conjunction with Metro Works Department and the Toronto Harbour
Commissioners
/4
B-427
- 4 -
Bluffers Toplands
- Restoration of former Fishleigh riltration ~lant site is substantially
complete following tree and shrub planting and turf estaolishment.
- A contract has been awarded for paving of the entrance road and parking
lot
- Plans are being reviewed for the proposed development of the former
Seminary lands in an effort to address some of the concern$ of local
residents
Bluffers Park
- The contract for paving of the roadway to the easterly end of the site
and the public parking lot adjacent to the swimming beach is underway.
- The fall planting is underway and upon completion the landscaping of
Phase II will be substantially complete
- All 4 Boat Clubs enjoyed successful summer seasons and arrangements for
haulout of boats are in place The clubhouse at Bluffers Park Yacht
Club is nearing completion All clubs undertook landscaping improvements
- A market analysis and cash flow study for the proposed marina has been
undertaken and the terms of reference for the proposal call will be
finalized in the near future.
- Erosion control work in Sunnypoint Ravine and along the base of the bluffs
adjacent to Phase II is nearing completion for 1983 Further works are
required throughout this sector in future years
East Point Park
- Detail planning of the road alignment and parking lot locations as well
as the stream and pond system is under review In addition, the details
of electrical supply and sanitary sewers are being planned It is
anticipated that some construction on the roadway and parking lot will
proceed in the Fall
- The City of Scarborough is reviewing its plans for a playing field
complex at the westerly end of the park Initial construction of the
playing fields is tentatively planned for the Spring of 1984
Ajax Waterfront
- Detailed planning of works to be implemented by M T.R C.A , Town of Ajax,
the Rotary Club and Wimpey Construction is underway
Shoreline Management
- Shoreline protection work for the Fallingbrook Drive area of Scarborough
is underway This work depends on access through the Toronto Hunt
property.
- Shoreline protection work is underway for the South Marine Drive area
with the first stage consisting of construction of an access roadway
across the frontage of the Guild Inn property
- Property negotiations are continuing in preparation for shoreline
protection along Springbank Avenue and Lakehurst Crescent
- A Project for Erosion Control in Bellamy Ravine was adopted by the
Authority and Metropolitan Toronto Funding arrangements are now under
consideration by the City of Etobicoke and the Ministry of Natural
Resources
/5
B-428
- 5 -
Envi~onrnent~l Monito~ing
- The results of the 1982 wat~front monitoring program are being compiled
in report fo~m
- Automatic temperature recorder~ are still in place and will ~e changed
in November
- The 1983 program is nearly complete with Proctor and Redfern Limited
completing sample analyses
- The 1983 field program at Colonel Samuel smith waterfront Area is
underway following discussions with the Ministry of the Environment
on sample procedures and fill quality monitoring
- A review of the 1984 program wil~ be discussed with the Ministry of the
Environment to incorporate changes to the monitoring program in view of
findings to date
- A request for exemption to The Environmental Assessment Act for the
South Marine Drive stabilization project was prepared and submitted to
the Minister, Ministry of the Environment
BED/BH/md
CD -
THE CHAIRMAN AND MEMBERS OF THE EXEClJTIVE <J.:l.1MITl'EE, M.T.R.C.A., - 1117/83 I
W: PAGE I .e.
N
JOHN W. MALEl'ICH, Ml\NI\GER, DEVEIDIMENl' CCNrnOL SOCTIOO \D
FRCM:
BE: AIMINISTRATION OF oomRIO RmJIATIOO 170 - JULY, JlUGUST AND SEP'nMBER, 1983
DETAILS OF VIOLATION NOTICE Em'. OPE ACTION TAKEN
LOCATION INITIALS
Town of Ridurond Hill V-S03, Mr. Povina Turk Jl.H -All filling stDpped and area partially
lDt 26, Plan M-1739 July 6, 1983 restored.
15 r-bodie Drive ('Ihornhill) 3 (b)
DJn River Watershed
Town of Ridmond Hill V-S04, Mr. Pasquale Marchese Jl.H -Resolved by site plan agreerrent.
Part lDts 41 & 42, Plan 2027 July 0, 1983
Penberton lbad 3 (b)
Don River Watershed
Town of Pickering V-50S, SiJron & Wilhelmina Il'l -Activity stowed and fill raroved.
S. pt. lDt 18, Con. 2 Wanrerdam -Disturbed areas restored.
1718 & 1726 Finch Avenue V-S06, Marjorie Villeneuve
Duffin Creek Watershed July 8, 1983
3 (b) and 3 (0)
Town of Vaughan V-S07, Luca Tesa & Giovanni. Conti [M -Fill ra\'oved and structure relocated.
West side of Islington Avenue (Ea:many Fanners Mal:ket) -Approved under Penni.t B-098.
South of Hwy. 7 V-S08, Ministry of Governrrent
Hurber River Watershed Services
July 13, 1983
3(a) and 3(b)
City of l'brth YOIX V-S09, Mr Peter Nitti [M -l~illing stowed.
lDt 13, Con. 6, WYS July 21, 1983 -o.mer discussing restoration with staff.
2924 Weston Ibad 3(b)
Hunber River Watershed
/L.
1983.09 30
'ID: '!HE 0IAIlMW AND MEMBERS OF '!HE EXEDJT1VE CXHnTlEE, M.T.R.C.A., - i 17/83 PlIGE II
FKM: JOON W. Ml\LEl'ICH, MAN1\GER, DEVEUlPMENl' CDll'ROL SEX:'l'ICN.
RE: AIMINISTRATIOO OF wrARIO REXmATI~ 170 - JULY, AUQJST AND SEPTEMBER, 1983
LOCATION DETAILS OF VIOLATION NOTICE Em'. en ACTION TAKEN
INITIALS
'l'atm of Pickering V-510, 358016 Ontario Limited I:M -Q1anne1 cx:rrp1eted through approval
Part Lot 33, Cbn. 1, V-5ll, Goryn Construction fran Pickering. ,
Lots 10 and 11, JUly 22, 1983
Pettiooat Creek Watershed 3(c)
'l'atm of Vaughan V-512, Mrs. Bessie Lund IM -Filling stowed.
Part Lot 10, Cbnoession 7 (Joy Valley Greenhouses) -Area restored.
Huroer River Watershed V-513, Mr. J05eli1 Nagy
August 4, 1983
3 (b)
City of Etobiooke V-514, Mr. Irvin Garten IM -Filling stopped.
Lots 3 & 4, Plan 1217 V-51S, Mr Jolm Szustaczek -Area restored and access closed.
2515 & 2511 Lakeshore !bad V-516, Mr. Mayer Garten
Waterfront V-517, Mr. Frank Rak
August 10, 1983
3(b)
'l'cMn of Ridurond Hill V-518, Mr. Henry Natale JlW -No further activity has been uOOertaken
Part Lot 64, Con. lW AUJUSt 16, 1983
Huroer River Watershed 3(c) in the waterrourse.
City of Scal:borough V-519, 382284 Ontario Ltd. I:M -Activity stopped, fill raooved, restoration
North side of Sheppard Ave. E., August 25, 1983 with top soil & seed rot done.
RlUJe River Watershed 3 (b)
/L. w
,
1983.09.30 ""
w
0
01
I
",.
w
.....
'10: THE CHAIR-Il\N l\ND MEMBERS OF THE EXEXlJTIVE a:J+II'rlEE, M. T .R.C.A., - i 17(83 PAGE III
FIQ.!: J<EN W. Mi\LEl'ICH, H1\Nl\GER, DEVEI.OPMI:1>ll CCNl'ROL SEX:'l'IW
REI AI:MINISTRATIrn OF CNrARIO REnJIATIm 170 - JULY, AlJQJST l\ND SEP'InlBER, 1983
LOCATION DETAILS OF VIOLATION NOTICE ~....:....~ ACTION TAKEN
'lWn of Pickering V-520, Mr & Mrs. 'll1anas Newm:ln IJI'l -Restoration underway l.U'lder staff direction.
North pt. lDt 9, COn. 6 August 25, 1983
Carruthers Creek Watershed 3(c)
City of Etabiooke V-521, Martinway COntracting Ltd. rM -Fill rem.:>ved and area restored.
Rear of III Disoo !bad August 25, 1983
Mimioo Creek Watershed 3 (b)
~
'lWn of Pickering V-522, The Municipal Clerk IJI'l -Letter received 1983.10.06 indicating
North pt. lDt 12, Con. 5 of the 'lWn of Pickering fill will be rerroved and area reshaped.
Duffin creek watershed AU3USt 31, 1983
3 (b)
City of Mississauga. V-523, Lapo Managarent Ltd. AW -Site restoration work in aocx:>rdanoe
~ lDt 12, COn. 3, EHS September 14, 1983 with staff requi.renents has beP..n initiated.
Etobiooke Creek Watershed 3(b)
'lWn of Pickering V-524, Pentea:>stal Assenblies IJI'l -Fill :renoved fran slope, area
Part lDt 13, COncession 3 of canada regraded, topsoiled and seeded.
North side of 3rd COncession !bad V-525, VerrD':f Excavating
Duffin creek Watershed September 14, 1983
3 (b)
fL.
1983.09.30
'10: THE ~ J\ND MEMBERS OF THE EXEXl1l'IVE CXHIlTIEE, M.T.R.C.A., - . 17/83 PAGE IV
F1D1: JCIIN W. Ml\LEl'ICH, Ml\NAGER, DEVElDl'HE1ll' CCNl'ROL SEX::'l'Irn.
RE: MMINISTRATIaI OF amuuo REXmATI~ 170 - JULY, l\lGJST, AND SEPTFMBER, 1983.
LOCATION DETAILS OF VIOLATION NOTICE ENF. CFF ACTION TAKEN
City of Branpton V-526, Gennaro & ~ DiGrecFrio m -Fesolved via the restoration of the
IDt 14, Plan M-232 V-527, Dc:mi.nion Paving Ltd. wateroourse to its original d1annel.
8th Line !bad September 19, 1983
Hunber River Watershed 3(c)
TcMn of Vaughan V-528, Vaughan Nurseries [M -Filling stopped and amer discussing
South side of Rutherford Rd. September 19, 1983
west of Keele Street 3 (b) restoration with staff.
[))n River Watershed
,
..
fL. w
I
1983.09 30 ~
W
N
B-433
TO The Chairman and Members of the Executive Committee
M T R C A - Meeting #17/83
FROM P B Flood, Administrator
Conservation Land Management Division
RE Conservation Land Management Division
PROGRESS REPORT
PROGRAM ADMINISTRATION
This report covers events, activities and project accomplishments to September
30 Considerable administrative staff time continues to be spent in
coordinating projects under various special employment projects
The largest project, COED ($820,000 and up to 57 employees) commenced in April
and progress on projects is well underway CCDP Programs are continuing in
York-Peel and Brampton-Georgetown ridings. The Ontario Riding project has
concluded The Experience '83 program commenced in May and employed 26
students on various projects to the end of August
Under the Provincial Works Sector Program, the Fisheries Enhancement and Parks
Sector projects concluded in May The Forestry Stimulation project continues
and a new project - Parks Sector and Conservation Area Improvement - is
underway Staff are preparing submissions for Conservation Area Development,
Operations and Conservation Land Management Projects, for the Canada Works
Program
WATERSHED RECREATION - PLANNING
The master planning study for the Boyd Conservation Area is in its final stages
of completion A prefered plan has been selected and presented to the public
at an open house on September 15 Comments received from this and subsequent
meetings with the Town of Vaughan and various ratepayers groups have been
incorporated where feasible, into the plan.
The study team is currently working on the details of the design and costing
of the Master Plan This information will be presented in draft report form
to the Region of York, Town of Vaughan and Metropolitan Toronto for comment
prior to finalization and approval by the Authority
In addition to the Boyd Study, the Authority under the COED Program, has been
working on master plans for the Albion Hills, Clareville and Heart Lake
Conservation Areas
Grounds maintenance plans, detailing turf management, tree and shrub maintenance
and future planting program for each of the Authority's recreational use areas
are also being prepared
WATERSHED RECREATION - DEVELOPMENT
The construction of the Indian Line residence/control building and the Albion
Hills washroom and picnic shelter is underway Foundations for all buildings
have been completed and the exterior shell of the Indian Line residence building
has been constructed At Albion Hills a 200 amp hydro line to service for the
washroom and picnic facilities has been installed
Under the COED program, a 250 sq ft extension to the Cold Creek trap range
building has been constructed At Bruce's Mill, major structural repairs have
been made to the grist mill
The COED program has also provided the Authority with an opportunity to update
and standardize Conservation Area signage New routed signs have been completed
for several areas In addition, a prototype of the Authority's new area
information sign has been constructed and is ready for installation at Cold
Creek
B-434
PROGRESS REPORT
PAGE 2
The COED program has also provided the Authority with an opportunity to update
and standardize Conservation Area signage To date, a detailed inventory of all
existing signage has been completed Production of new signs is underway using
a recently acquired routing machine The painting of several Authority
buildings has also been undertaken using COED labour
WATERSHED RECREATION - OPERATIONS
During the first quarter of 1983, the usual 6 Conservation and 2 Forest and
Wildlife Areas were open for public use Due to the abnormal lack of snow
normal winter recreation activities were not possible. The Albion Hills and
Bruce's Mill ski programs were able to offer limited facilities on 3 and 2
weekends respectively Only 5 groups at Albion Hills and 2 groups at Bruce's
Mill were able to participate in the instructional program In an effort to
reduce costs ski staff were released early None of the scheduled winter
Special Events were held
The monthly Retriever Trials commenced in March at both Clairevi11e and Cold
Creek The Bruce's Mill Maple Syrup Demonstration began the first weekend of
March, a week earlier than usual Attendance for organized school tours was
4281, a decrease of 502 over last year General public attendance was 14,249,
an increase of 507 over 1982
During January, the annual delivery of 45,000 Rainbow Trout fry was received at
the Glen Haffy hatchery This fish will provide the "Put and Take" stocking
supply for the Glen Haffy ponds, Heart Lake and other Areas in 1984 In July, a
successful "Fish Derby" was held with 8 lucky anglers catching tagged fish and
winning prizes donated by Molson's and Ruko Canada
The lack of winter recreation activity permitted Area staff to carry out more
than the usual amount of routine maintenance and repairs to buildings, grounds
and facilities This work was augmented by 2 Special Employment programs At
Bruce's Mill, 2 young workers were employed under the Winter Experience Program
to assist with maintenance and program preparations At Claireville, Heart Lake
and Boyd Areas, 2 3-man crews started work under the 1983 Canada Community
Development Program (CCDP) These workers assisted with building and picnic
table cleaning and painting and also accomplished considerable landscape tree
pruning in picnic areas This program continued throughout the summer and
expanded to all Areas
Under the Authority's COED program, 10 workers have been hired to assist
Conservation Area staff with regular operations and maintenance These
additional workers have assisted in upgrading maintenance standards to levels in
previous years A crew of 3 workers is at Indian Line Campground carrying
out new planting and maintaining all plantings They also assist in all ground
maintenance work at the campground
The Experience '83 program has provided 2 crews of three students to work on
Area nature trails At Clairevil1e and Heart Lake, pruning and surfacing has
been completed along with preliminary assessment of the Albion Hills trail The
eastern crew has completed pruning and surface improvements to trails at
Bruce's Mill, Greenwood and Petticoat Creek An additional 13 students have
been employed as gate and boat concession attendants
At Cold Creek, 119 people attended the six Hunter Education Courses conducted by
the Area Superintendent In response to demand, section staff, in consultation
with I&E Division staff, have revamped the Shooting Skills Program for school
groups and this program is being offered to grades 7 and up starting in
September
During the winter, Sporting Clubs have used the ranges for 2 "Ham Shoot"
competitions The Upper Canada Rifle Association has held a monthly event
during April - June and September In June, the National Golden Retriever
Trials were held at Cold Creek The Radio Controlled Flying Club of Toronto
hosted it's annual Fly-In in early August
All Areas were in operation for summer activities by early May with the 7
swimming areas opening as scheduled the first weekend of June During July and
early August, high bacteria counts resulted in the closing of Boyd, Claireville
and Bruce's Mill swimming areas Bad algae growth at Heart Lake has also forced
periodic closing of that swimming area
At Heart Lake, a public boating program was established opening the lake to
private non-motorized water craft The weekend ORCA canoe instruction programs
at Claireville have again been well received with 58 participants attending the
8 courses
B-435
PROGRESS REPORT
PAGE 3
In an effort to reducing operating costs, the group (school) instructional
program was dropped However, equipment has been rented to 3 groups to run
their own program The Claireville water ski site has been used for 4
tournamen~s including the Ontario Championships
At Albion Hills, the Rambling Hills Riding Club has held their monthly horse
show The new public riding program at Claireville began operation in June To
date, user comments have been very favourable and attendance is growing
During the winter, Petticoat Creek staff again carried out the annual inventory
of all Authority vehicles and equipment and the annual inventory for the Land
Management Division of all Area tools, equipment and furnishings Division
staff have devoted considerable time to preparation and processing of Tenders
for the Authority's acquisition of replacement vehicles, tractors and equipment
All items including 5 replacement trucks and 4 tractors, have been received
Through the winter, Division staff organized a training seminar on Chainsaw
maintenance and safe "felling" techniques This program sponsored by the
Ontario Pulp and Paper Makers Safety Association was attended by staff from
various Authority locations and has been very favourably received by all
attending It is a valuable addition to the Authority safety program A
tractor maintenance seminar sponsored by the Ford Motor Company was held for
operating staff involved in tractor operation. Two Conservation Area
supervisors and the Safety Officer attended the MNR Enforcement Course and
successfully passed the test requirements They will be eligible for future
appointment as Provincial Offences Officers to enforce the Authority's
Conservation Area Regulations In early July, all lifeguard staff attended a
two day cardio pulmonary resucitation course to improve the level of lifesaving
skills available for emergencies
Division staff have been actively involved in promoting Area recreation
facilities by staffing displays at the Camping on Wheels and the Canadian
National Sportsmens Shows Emphasis in both displays was on Conservation Area
recreation facilities Revisions have been completed and updated information
pamphlets printed for campground operations, boating programs and range
operation Copy for the individual Area brochures was revised in preparation
for printing The Bruce's Mill and Claireville brochures are available with
other Areas to follow shortly Considerable input was provided by Division
staff into the preparation of the new "Conservation Areas Brochure" This
brochure has been well received by Area visitors.
The following table shows Area attendance for the period January 3 to September
30, 1983 It shows a decrease of 19,789 people or 2~ over the same period in
1982 Summer attendance (June to August) is up over last year by 79,22l The
closing of swimming areas, due to high bacteria content, prevented summer
attendance increases from offsetting winter (January to March, 66,864) and
spring (April/May; 39,825) decreases
ATTENDANCE AT CONSERVATION AREAS, JANUARY TO SEPTEMBER 30, 1983
1983 1982
ALBION HILLS 120,840 141,631
BOYD 128,712 136,691
BRUCE'S MILL 141,869 154,767
CLAIREVILLE 117,176 128,988
COLD CREEK 31,300 29,481
GLEN HAFFY 52,038 62,194
GREENWOOD 56, 183 60,106
HEART LAKE 89,271 75,364
INDIAN LINE 51,679 56,644
PALGRAVE 334 9,509
PETTICOAT CREEK 156,008 110,671
WOODBRIDGE 12,905 12,058
958,315 978,104
B-436
PROGRESS REPORT
PAGE 4
CONSERVATION LAND MANAGEMENT PROGRAM
Job creation programs funded by the Federal and Provincial Governments have
enabled the Authority to accelerate resource management projects on Authority,
public and privately owned lands within the watershed
On Authority owned lands, staff hired under the Canada Community Development
Program and the Parks Work Sector Program carried out woodlot and plantation
management programs in the following locations Bolton Resource Management
Tract (201 cu m /56 cords of firewood), Glen Haffy Forest and Wildlife Area (432
cu m /120 cords of pulpwood and 1600 meters of fireguard maintenance), Glen
Major Resource Management Tract (1500 meters of firegaurd development) The
Bruce's Mill Conservation Area produced 45 cU.m /12 cords of firewood this past
winter Since May, staff on the COED and Forest Stimulation Programs have
continued with forest management Four hectares of plantation in the Glen Haffy
Forest and Wildlife Area have been thinned An estimated 400m3 (110 cords) of
merchantable pulpwood and 450m (125 cords) undersize firewood quality pine
has been produced Approximately 4,500m of firebreaks and forest access roads
have been upgraded in the Glen Major Resource Management Tract and the Glen
Haffy Forest and Wildlife Area This work involved grading, grass seeding,
brush and rock removal and prunning
Forest management work including thinning selective cutting and fireguard
maintenance will continue through the fall utilizing the Parks Sector and
COED job creation programs Sites include the Glen Haffy Palgrave, Claremont
and Glen Major Areas
As part of the Resource Management Tract Program, Area staff have continued
to maintain existing fireguards in the Glen Major, Goodwood, Glen Haffy and
Palgrave Areas
Twenty three hundred meters of fencing have been constructed in the Bolton
and Nashville Resource Management Tracts to control unauthorized motor vehicle
access and garbage dumping The Parks Sector Job Creation Program has provided
the labour and materials for this work. Additional fencing will be completed
in Claireville and/or the Snelgrove Resource Management Tract as part of this
program
Under the Fisheries Work Sector Program, which started in the fall of 1982,
staff developed and posted 8 km of fishing trails in the Bolton Resource
Management Tract and 4 km. in the Claremont Forest and Wildlife Area Six
fishing piers were also constructed for the C1aireville Conservation Area It
is anticipated that the installation of these piers will enhance the fishing
opportunities in the reservoir
This summer, the Authority took part in the Conservation Services Experience
'83 Sub-Program A total of 560 meters of cold water fish habitat was improved on
two private properties located on the headwaters of the Humber River Eroding
streambanks were stabilized and artificial bank covers, deflectors and in-stream
boulders were installed On a third private property a 80m eroding streambank
was stabilized
The Authority has also worked in co-operation with Save Our Streams, an
organization dedicated to enhancing fisheries habitat To date, they have
completed stream improvement projects in the Claremont and Palgrave Forest and
Wildlife Areas It is their intent to erect signs on location acknowledging
the contribution of M T R C A.
Reforestation projects have been completed on Authority lands with 50,000
seedlings planted at the Glen Major Resource Management Tract, 6,000 at the
Palgrave Forest and Wildlife Area, and 14,000 for the Lake St George Forest and
Wildlife Area Boy Scout groups have planted 10,000 seedlings at the Bolton
Resource Management Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at
the Boyd Conservation Area, and 10,000 at the Glen Major Resource Management
Tract
Planning projects for resource management programs on Authority owned lands
are continuing Regular staff and those working on the Forest Stimulation,
COED and Parks Sector Work Programs have undertaken forest inventories on
10 properties including
Bolton Resource Mgt Tract Kolodziej Forest & Wildlife Area
Nashville Resource Mgt Tract Palgrave Forest & Wildlife Area
Goodwood Resource Mgt Tract Cold Creek C A
Glen Major Resource Mgt Tract Albion Hills C A
Glen Haffy Forest and Wildlife Area Bruce's Mill C A
B-437
PROGRESS REPORT
PAGE 5
Multi year forest management plans are being finalized with the remaining
rural Authority properties to follow
Wildlife inventories including breeding bird census have been completed for
Glen Major, Bolton and Nashville Resource Management Tracts In addition
wildlife habitat delineation is underway for these same properties This
information will be utilized in the formation of wildlife management plans
and will be incorporated in the resource management plans
To assist the Black Creek Group, a community environmental group, a Wildlife
inventory, habitat analysis and stream assessment was completed for the Black
Creek from Finch Avenue to its Source
With the assistance of the COED and Experience'83 programs, staff have
inventoried the rivers and stream on Authority properties in the rural areas
This information together with the forestry, wildlife and other existing data
will be used to complete the overall resource management plans for Conservation
Areas Forest and wildlife Areas and Resource Management Tracts
An Authority land reforestation inventory has been prepared which summarizes
all the p1antings on MTRCA property from 1957 to present A similar inventory
of past erosion control and fisheries improvement projects has also been
compiled Todate approximately 35 kelometers of work on streams has been
completed
Agricultural land rental reviews have been carried out on thirteen Authority
lands todate in 1983 Approximately 47,525 reforestation trees were planted
this spring for twenty landowners A total of 16,043 wildlife shrubs and
3753 trees were planted in the spring and fall under the Tree and Shrub, and
Urban Wildlife programs An additional 20 containers stock cornifers were
sold for wind break purposes Two Conservation plans have been completed
this year and a further 2 are on file To date 35 Conservattion Plans have
been completed for private landowners One reforestation subsidy has been
approved for 19,000 trees Orders are on file for the spring of 1984 for
49,650 reforestation trees, 2200 trees and 1740 shrubs
A questionaire was prepared and delivered to a select number of landowners
in the headwaters of the Duffins Creek, a high priority .area for the application
of private land conservation management programs Attitudes towards, and
the existing state of reforestation, woodlot management, and ESA management
were surveyed The survey will be expanded to other headwaters areas in 1984
Under Private Land Assistance Programs 145 site visit have been carried out
to date providing advince on reforestation, tree and shrub planting, urban
wildlilfe, wind breaks, wildlife habitat, erosion control, and ESA management
In addition 7 pond site visits have been carried out
Planting activities for private lands programs include continuing inventory of
past assistance programs, a land use review of major watershed to priorize
project locations and continuing argicultural land use review
Staff have currently been working on programs for ESA management on Authority,
private and public lands To assist in this project, both a priority and
preservation list of ESAs have been prepared This priority list was based on
research of existing information and communication with other staff and agencies
and categorized ESAs on their need for management due to present ~nd potential
impacts Presently, 43 ESAs have been field inventoried for impacts and a
management strategy for each has been prepared indicating recommendations for
the management of these ESAs
These management strategies will be incorporated into resource management plans
where required; will aid in identifying priority areas for the private landowner
assistance programs; and will be utilized during discussions with public
agencies
B-438
PROGRESS REPORT
PAGE 6
Promotion for Services Programs has included to date the circulation to cable
T V. outlets a video tape of the Conservation Services slide presentation and
news releases for various assistance programs A slide presentation on the
Density Bonus Program will be completed in the near future
Inventories have been completed for 90% of the primary and secondary
watercourses within Metro Toronto and surrounding municipalities for the
Authority's Urban Management program Three planting projects have been
completed for the Rouge and Don Rivers and Highland Creek Two hundred and
ninety-five trees and 1,300 wildlife shrubs have been planted In addition,
approximately 200 meters of valley slope has been graded and hydro-seeded at the
Etobicoke General Hospital along the Humber River. Plantings have also been
carried out for the City of Brampton with 4,450 seedlings, 100 trees and 890
shrubs being established Six additional sites are scheduled for the fall under
the COED program. Approval in principal has been reached with the City of
Brampton for a joint project to be conducted in the spring of 1984 on public
lands
Landscape projects have been carried out at Humber Bay West, Aj ax Water fron t
Area and Bluffer's East waterfront development projects. Tree maintenance
projects have also been carried out Projects were also carried out as part of
the Bolton channelization project and the South Thackeray Sanitary Landfill
Site The following Landscape Projects will be commencing in the fall of
1983
(1) Indian Line Campground Entrance
(2) Fishleigh Filtration Plant
(3) Frenchman's Bay
(4) Saddle House - Claireville C A.
(5) Glen Major
The Authority nursery program supplied trees and shrubs to various tree planting
and landscape projects as well as to the Flood Co~ro1 Section, MNR, South Lake
Simcoe, and Kawartha Lakes Conservtion Authorities and Save Our Streams Under
the COED program, staff have assisted in accelerating the production of plant
material used on job creation projects
The nursery has produced the following salable stock for the fall 1983 and
spring 1984 programs
bare root shrubs 58,715
bare root trees 7,935
container stock 2,810
claiper trees 950
B-439
PROGRESS REPORT
PAGE 7
FINANCIAL STATEMENT
YR TO DATE ~ BUDGET
EXPENDITURES EXPENDITURES BUDGET USED
Administration 538,472 673 , 204 80 0
Watershed Recreation Planning 31,270 75,000 42 0
Conservation Area
Development 22,779 181,960 12 5
Operations & Maintenance 1,723,444 2,149,000 80 2
Conservation Land
Management Planning 89,020 118,500 75 1
Conservation Management 233,242 309,181 75 4
Fish Rearing 4,438 10,500 42 0
Operations - Non-Revenue 24,520 31,000 79 1
REC'D TO ~ BUDGET
REVENUES 1982 BUDGET DATE REC'D
Operations & Maintenance 1,016,000 906,912 89 3
Conservation Management 134,000 93,363 69 7
FINANCIAL COMMENTS
PRO~AM ADMINISTRATION
Spending levels indicate that this portion will be over budget by
approximately $18,000 This is a result of a much greater increase
in benifits than anticipated for premiums ($14,000) and budget reduction for
gapping ($4,000) Reductions in spending in the Central Services,
Conservation Services and Conservation Planning programs have been made to
cover $14,000 of this projected deficit
PLANNING & DEVELOPMENT
The Boyd Master Planning Study is on schedule and within budget
Work on the two major development projects is underway; however, expenses
for these projects were not processed in time to show on the third quarter
financial statement
CONSERVATION AREA OPERATIONS
Projected spending to year end indicated expenditures would be under
budget The amount however will not be sufficient to offset the severe
impact of lost revenues from the winter periOd The loss of swimming in key
Areas prevented any chance of increased summer revenues to overcome the
shortfall
Area Superintendents have reduced their spending projections to reduce costs
by approximately $46,000
CONSERVATION LAND MANAGEMENT
Expenditures for all programs are in line for this time of year Reven ue
estimates will be met following fall programs
1983 10 27
PBP/lp
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
DIVISIONAL EXPENDITURE SUMMARY
FOR THE PERIOD SEPTEMBER 5, 1983 to OCTOBER 2, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $ $
Finance & Admin.Cinc1. Land Acq.) 3,186,465 163,431 1,910,896 1,275,569 60.0
Water Resource - Flood Control 2,911,389 299,197 1,807,385 1,104,004 62 1
Water Resource - Waterfront 2,325,000 138,843 1,045,623 1,279,377 45.0
Conservation Land Management 3,548,345 225,415 2,667,380 880,965 75.2
Information & Education 2,426,623 1.67,273 1,580,913 845,710 65.1
Historical Sites 3,912,822 253,579 1,553,765 2,359,057 39.7
Vehicle & Equipment - Capital Acq. 280,730 77,821 198,626 82,104 70.8
SUB-TOTAL 18,591,374 1,325,559 10,764,588 7,826,786 57.9
Vehicle & Equipment - Operations -- 20,923 186,128 -- -
Special Projects -- 57,753 566,871 -- -
C.O.E.D. 1983/84 2,123,808 209,549" 901,055 1,222,753 42.4
Food Services 833,317 73,540 679,919 153,398 81.6
TOTAL 21,548,499 l,687,324 13,098,561 9,202,937 60.8 tIl
()
:I:
~===~==~===~==c==c~======c==============~c=======================~===== t'l
0
C
['"
t'l lJl
I
""
1983.10.17 () ""
: 0
~ B-441
,
the metropolitan toronto and region conservation authority
minutes REPORT #19/83
EXECUTIVE COMMITTEE 16-NOVEMBER-1983 #19/83
The Executive Committee met at the Authority Office, S Shoreham Drive, Downsview,
on Wednesday, 16 November, 1983, commencing at 9 30 a m
PRESENT FOR THE HEARING
Chairman Mrs. F.E. Gell
Members W.G. Barber
M W H. Biggar
Mrs L. Hancey
H.C. Lawrie
S A. Macpherson
J S. Scott
Following the roll call, the meeting adjourned to hold a hearing re
Mr Lloyd Ginou
City of North York
Don River Watershed
PRESENT FOR THE MEETING
Chairman Mrs. F.E Gell
Members W G. Barber
M W H. Biggar
E Ful ton-
Mrs. L. Hancey
H C. Lawrie
S A. Macpherson
Ms S Nimmo
(For- Mrs N. Stoner) Mrs M. Prinsloo
J S. Scott
Authority Member A.L Smoke
ABSENT
Vice-Chairman E V. Kolb
Member Mrs. N Stoner
MINUTES
Res #:305 Moved by: If.G Barber.
Seconded by H ..c. Lawrie-
THAT the Minutes of Meeting #l8/83 be- approved.
CARRIED
The Secretary-Treasurer introduced Mr. Jonathan Wigley of the legal. firm
Gardiner, Roberts, who was present to answer' members' questions. in. connection wi.th.
hearings under Ontario Regulation 170.
SECTION I
NO ITEMS
i
8-442 -2-
SECTION II
FOR INFORMATION
1 DECISION OF HEARING
Mr Lloyd Ginou
City of North York
Don River Watershed
Res #306 Moved by S A Macpherson
Seconded by J S Scott
THAT the application of Mr Lloyd Ginou in accordance w~th Ontario
Regulation 170, for permiss~on to place fill and construct a structure
within the regulated area, as shown on Flood Line Map Sheet #13 of the
Don River watershed, City of North York, be withdrawn without prejudice
CARRIED
2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #307 Moved by Mrs L Hancey
Seconded by J S Scott
THAT the applications listed herein as A(l) to A(4) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
A (1) The Regional Municipality of Durham
To place fill at south-west corner of Frenchman Bay, south of
Breezy Drive and Sunrise Avenue, Town of Pickering (Waterfront)
In accordance with the following documents and plans, which shall form
part of the permit
A plan entitled "Proposed Access Route to Manholes", prepared by
The Regional Municipality of Durham, dated August, 1983
Correspondence from Kees J Schipper of Durham Region to our
office, dated October 18, 1983
A(2) Consumers' Gas Company
To construct gas main across Rouge River at Kennedy Road, south
of Highway #7, Unionville , Town of Markham
In accordance with the following documents and plans, which shall form
part of the permit
Drawing #30-1659, Sheet 2 of 2, prepared by the
Consumers' Gas Company, and dated October 26, 1983
A (3) H J Heinz Company of Canada Ltd
To construct building addition north of Steeles Avenue, east
of Dixie Road, City of Brampton (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
All work being done in accordance with Drawings A-I and BM-l,
prepared by Quan, Carruthers, King, & Quan Consultants Ltd ,
and dated September 13, 1983
(4 ) Mr John Gardner
To construct addition to dwelling at #91 Plymbridge Road,
City of North York (Don River Watershed)
In accordance with the following documents and plans, which shall
form part of the permit
Detailed Architectural Drawings as prepared by
Algimantas 8anelis Architect
-3- B-443
3. LAND ACQUISITION PROJECT 1982-1984: HUMBER RIVER WATERSHED
-Property: Finery Investments Limited
West of Indian Line, north of Darcel Avenue
City of Mississauga
Res. #308 Moved by: M.W.H. Biggar
Seconded by: H.C. Lawrie
THAT the report (OCtober 27, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase.
CARRIED.
Re: Project: Land Acquisition Project 1982-1984 - Flood
Plain & Conservation Land Component: Humber
River watershed
Authority: Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property West of Indian Line, north of Darcel Avenue
Owner: Finery Investments Limited
Area to be acquired: 0.030 acres, more or less
Recommended purchase price: Nominal consideration of $2.00
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lots 40, 41, 42, 43, 44, and 45, Plan
M-420, City of Mississauga (The Regional Municipality of Peel), located west
of Indian Line, north of Darcel Avenue (Finch Avenue Extension), in the
Claireville area.
"Negotiations have been conducted with the owner, and, subject to the approval
of your Committee, agreement has been reached with respect to a purchase
price, as follows
The purchase price is to be the nominal consideration of $2.00,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
costs and disbursements are to be paid. The Authority is to receive con-
veyance of the land free from encumbrance
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition, and is in concurrence with my recommendation.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate.
4. BRUCE'S MILL CONSERVATION AREA
-Quotation Oil Furnace - Workshop
f
The following quotations were received for the supply and installation of a
new, oil-fired, forced air furnace in the Bruce's Mill Conservation Area
workshop
Supplier Amount
Commercial Burner Maintenance Ltd. (218,000 BTU unit) $2,750 00) Prices
Fletcher Heating Ltd. (180,000 BTU unit) $2,975.00) include all
taxes
Res. #309 Moved by: H.C. Lawrie
Seconded by: M.W.H. Biggar
THAT the quotation of Commercial Burner Maintenance Ltd., for the supply
and installation of a new, oil-fired, forced air furnace in the workshop at
the Bruce's MiYl Conservation Area, in the amount of $2,750.00 (including
all taxes), be accepted, it being the lowest quotation received
CARRIED.
B-444 -4-
5 QUOTATION #CLM83 40
-1983 Snow Plow
The following quotations were received for the supply, delivery, and
installat10n of one new 1983 7'6" commercial, heavy duty, snow plow
Supplier Amount
Marmac Hydraulics $1,995 00 + PST
Dynaltco Hydrau11cs $2,017 00 + P S T
Res #310 Moved by H C Lawrie
Seconded by M W H Biggar
THAT the quotation of Marmac Hydraulics, for the supply, delivery, and
installation of one new 1983 7'6" commercial, heavy duty snow plow, in the
sum of $1,995 00 (+ 7% Provincial Sales Tax) , be accepted it being the
lowest quotation received
CARRIED
6 LAKE ST GEORGE FIELD CENTRE
-Quotation Garden Tractor
The following quotations were received for the supply of one John Deere
Model 318 garden tractor, with snow thrower, wheel we1ghts, chains, and
cab
Supplier Amount
Snowball E'nterprises $6,568 00
Ken Maynard Services Ltd $6,663 00
Hutchinson Farm Supply Ltd $7,075 00
Clark Moore Motors $7,870 00
Provinc1al Sales Tax extra
Res #311 Moved by Mrs L Hancey
Seconded by S A Macpherson
THAT the contract for the supply of one John Deere Model 318 garden tractor
be awarded to Snowball Enterprises, in the amount of $6,568 DO, plus
Provincial Sales Tax it be1ng the lowest quotation received
CARRIED
7 PRELIMINARY PROVINCIAL POLICIES FOR CONSERVATION AUTHORITIES
Res #312 Moved by Mrs L Hancey
Seconded by Ms S Nimmo
THAT the staff report on the Preliminary Polic1es for Conservation
Authorities be received and forwarded to the Executive Director of the
Association of Conservation Authorities of Ontario for consideration in
the preparation of the ACAO response to the Minister of Natural Resources
CARRIED
8 FINANCIAL REPORT AND ACCOUNTS FOR THE
PERIOD OCTOBER 3-0CTOBER 3D, 1983
Res #313 Moved by J S Scott
Seconded by M W H Biggar
THAT the Divisional Expenditure Summary for the period October 3-0ctober 30,
1983, as appended as Schedule IlAII of these Minutes be received
AND FURTHER THAT payment of the Authority accounts, 1n the amount of
$1,515 729 00, be approved
CARRIED
-5- 8-445
9. EXPERIENCE '83
Res. #314 Moved by: Mrs. L. Hancey
Seconded by: S.A. Macpherson
THAT the staff communication, together with letter received from the
Honourable Alan W. Pope, Minister of Natural Resources, under date of
November 9, 1983, having regard to the Experience '83 Program, be
received.
CARRIED.
10. NEW BUSINESS
Mr. Fulton stated that he would be pleased to contact the City Clerk of
the City of Scarborough regarding arrangements to host the Annual Meeting
of the Authority on Friday, February 17, 1984.
11. TERMINATION
On motion, the meeting was terminated at 11 15 a.m., November 16, 1983.
Florence E. Gell W.E. Jones
Chairman Secretary-Treasurer
KC.
Ul w
n I
:c .to.
trJ .to.
Cl 0\
C
L'
trJ
THE t1ETROPOLI'rAN TORONTO AND REGION CONSERVATION AUTHORITY
:J>o
DIVISIONAL EXPENDITURE SUMMARY =
FOR THE PERIOD OCTOBER 3, 1983 to OCTOBER 30, 1983
Expenditures
Current Year to Funds %
Budget Month Date Available Spent
$ $ $ $
Finance & Admin ( incl Land Acq ) 3,186,465 200,673 2,111,569 1,074,896 66.3
Water Resource - Flood Control 2,911,389 338,240 2,145,625 765,764 73 7
Water Resource - Waterfront 2,325,000 107,759 1,153,382 1,171,618 49 6
Conservation Land Management 3,548,345 234,502 2,901,882 646,463 81.8
Information & Education 2,426,623 146,653 1,727,566 699,057 71 2
Historical Sites 3,912,822 149,387 1,703,152 2,209,670 43 5
Vehicle & Equipment - Capital Acq. 280,730 9,721 208,347 72,383 74.2
SUB-TOTAL 18,591,374 1,186,935 11,951,523 6,639,851 64.3
Vehicle & Equipment - Operations -- 17,049 203,177 -- -
Special Projects -- 68,924 635,795 -- -
C.O E D 1983/84 2,123,808 174,402 1,075,457 1,048,351 50 6
Food Services 833,317 68,419 748,338 84,979 89 8
TOTAL 21,548,499 1,515,729 14,614,290 7,773,181 67.8
-----------------------------------------------------------------------
-----------------------------------------------------------------------
1983 11.08
~ B-447
,
the metropolitan toronto and region conservation authority
minutes REPORT ::20/83
EXECUTIVE COMMITTEE 30-NOVE~BER-1983 #20/83
The Executive Committee met at the Author~ty Office, S Shoreham Drive, Downsview,
on liednesday, 30 November, 1983, commencing at 10 00 a m
PRESENT
Chairman Mrs F E Gell
Vice-Chairman E V Kolb
Members W G Barber
M W H Biggar
(For Ms S Nimmo) J A Bryson
E Fulton
Mrs L Hancey
H C Lawrie
S A Macpherson
(For Mrs N Stoner) Mrs M Pr~nsloo
J S Scott
.;BSENT
Members Ms S Nimmo
Mrs N Stoner
~
MINUTES
Res #315 Moved by S A Macpherson
Seconded by W G Barber
THAT the Minutes of Meet~ng #19/83 be approved
CARRIED
SECTION I
NO ITEMS
SECTION II
FOR INFORMATION
1 CORRESPONDENCE
~r W A McLean, Acting General Manager, reported recei~t of the following
correspondence
Letter from Alderman Ed Fulton of the City of Scarborough, adv~s~ng of a
press release ~ssued by the Honourable Paul Cosgrove concern~ng the land
known as the Johns-Manv~lle property at the ;nouth of the Highland Creek in
the City of Scarborough
Res #316 Moved by Mrs M Prinsloo
Seconded by Mrs L Hancey
THAT the staff be directed to ~repare a report concern~ng the Johns-Manville
site for presentation to the next regular meetinq of the Executive Committee,
scheduled to be held on Wednesday, December 14, 1983
AND FURTHER THAT Mr John Mackie, Alderman, Ward 9 City of Scarborough, be
advised that th~s matter 1S on the aqenda of said meeting
CARRIED
B-448 -2-
At Meeting #18/83, a letter received from the Honourable Susan Fish was
presented, approving a 1983 operating grant for the Black Creek P~oneer
Village Visitor Centre, and request~ng acknowledgment of this support in
all promotional or educat~onal material produced by the museum Resolution
#291 directed staff to prepare a report concern~ng the proposed method of
acknowledgment
In this connection Mr McLean informed the Committee that the Administrator
of the Historical S~tes Division has advised h~m that a statement can be
included ~n certain of the Authority's brochures
Res #317 Moved by M W H Biggar
Seconded by S A Macpherson
THAT acknowledgment of the 1983 operat~ng grant, provided by the Ministry of
Citizenship and Culture for the Black Creek Pioneer Village Visitor Centre,
be included in the appropriate promotional material of the Authority,
AND FURTHER THAT the Min~stry be so informed
CARRIED
2 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #318 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the applications listed herein as A (1) and A (2) , be approved, subject
to the conditions conta~ned in the reports
CARRIED
A (1) Campo Estates -&- Tam~ani Developments Ltd ,
To construct two storm sewer outfalls and a sanitary sewer crossing,
north of Raymerville Dr~ve, Town of Markham (Rouge River Watershed)
In accordance w~th the following documents and plans, which shall form
part of the perm~t
Project #81-ES-623, Drawings 53 and 60, dated October 1983,
by Fred Schaeffer & Associates Ltd
A(2) Woodbridge Square Joint Venture Project
To undertake a storm water management project, vicinity of
Woodbridge Avenue and Clarence Street, former Village of
of Woodbridge, Town of Vaughan (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the perm~t
(a) Drawing #3 Storm Water Retent~on, and Drawing #4 Cut and Fill
Area Plan dated October 11, 1983 as prepared by Underwood
McLellan Ltd
(b) Storm Drainage Report entitled, "Woodbridge Square J V P
Town of Vaughan" submitted by John Jaciw, P Eng
3 LAND ACQUISITION PROJECT 1982-1984 DON RIVER WATERSHED
-Property Concorde Square Limited
North of Wynford Heights Crescent, east of
Don Valley Parkway, C~ty of North York
Res #319 Moved by W G Barber
Seconded by J A Bryson
THAT the report (November 21, 1983 ) set forth herein, received from the
Manager, Property & Adm~nistrative Serv~ces be adopted, and that the
Secretary-Treasurer be authorized and d~rected to complete the purchase
CARRIED
-3- B-449
Re Project Land Acquis~tion ProJect 1982-1984 - Flood
Pla~n & Conservation Land Component Don
R~ver watershed
Author~ty Sxecut~ve Resolution #88, Meet~nq ~4 -
.:\'pril 8, 1981 and Author~ty Resolution ~38,
t-leeting #3 - May 15, 1981
SubJect property North of Wynford Heights Crescent
Owner Concorde Square Limited
Area to be acquired 2.889 acres, more or less
Recommended purchase price $2,500 00 per acre (i e $7,222 50) ,
plus vendor's legal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lots 2 and 3 Concession IV E Y S
City of North York (The Municipality of Metropolitan Toronto), located east
of the Don Valley Parkway, north of Wynford He~ghts Crescent
"Negotiations have been conducted w~th the owner's solicitor, Mr
Murray H Chusid 1000 F'inch Avenue West, Suite 700, Downsview, and, subject
to the approval of your Committee, agreement has been reached with respect to
a ~urchase price, as follows
The purchase price ~s to be $2,500 00 per acre (~ e 57,222 50)
plus vendor's legal costs, w~th date of completinq the transaction
to be as soon as poss~ble
"I recommend approval of this purcbase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing', for land transfer tax, legal
costs and disbursements, are to be paid The Authority is to receive con-
veyance of the land requ~red free from encumbr~nce
"The Administrator of the Water Resource Division has reviewed this proposed
acquis~tion, and is in concurrence with my recommendation
".I\n appl~cat~on has been made to the Ministry of Natural Resources for an
Inspection Certif~cate "
4 PROJECT F'OR EROSION CONTROL & SLOPE STABILIZATION
THE REGIONAL MUNICIPALITY OF' PEEL, 1982-1984
-Proposed Remedial Work Vicinity of Glasgow Road,
Town of Caledon
(Humber River Watershed)
Res #320 Moved by W G Barber
Seconded by J A Bryson
THAT the proposed erosion control works at the rear of Albert Street in the
Town of Caledon be deferred,
THAT the funds allocated for the Albert Street project be made available for
the Glasgow Road project,
AND F'URTHER THAT eros~on control remedial works be carr~ed out in the v~cinity
of Glasgow Road, Town of Caledon, at an estimated cost of 518,000 00
CARRIED
5 SALE OF' SURPLUS AUTHORITY ASSETS
(HAVING A VALUE OF' MORE THAN 5500 00 )
In accordance with Author~ty policy for disposal of assets in excess of
5500 00 the staff has ident~f~ed equ~pment and mach~nery as surplus to its
needs, consisting of five pick-up trucks and two tractors The following
b~ds have been rece~ved for the trucks
B-450 -4-
VEHICLE HIGHLAND CHEV OLDS OTHER
1978 Dodge Custom 200, #0018 $1,875 00 $ 535 00
Dodge Custom 200, #NOOOll 1,850 00 856 00
Ford F250 Custom #KOO037 2,020 00 1,342 85
535 00
1977 Ford F250 Custom, #00017 2,020 00 1,926 00
1978 Dodge, #00020 1,875 00 1,979 50
856 00
535 00
Bids have not been received for the two tractors, but it is anticipated that
their value will be in excess of $500 00 each
Res #321 Moved by M W H Biggar
Seconded by E V Kolb
THAT the following equipment be declared surplus to Authority needs and that
it be offered for sale to the highest bidder
1978 Dodge Custom 200 Pick-up Truck, #0018
Dodge Custom 200 " " #NOOOll
Ford F250 Custom " " #KOO037
1977 Ford F250 Custom " " #00017
1978 Dodge " " #00020
1974 MF Diesel Tractor w/front end loader + 8' blade, 1 set of
chains, Sims cab, Model FM40, Ser 9A182491, Equip #D-l-OOO
1974 MF135 Diesel Tractor w/roll over protection, Model MF135,
Ser 57517J
AND FURTHER THAT the bid received from Highland Chev Olds of Aurora be
accepted for the sale of the 5 pick-up trucks, it being the highes~
quotation received
CARRIED
6 KORTRIGHT CENTRE FOR CONSERVATION
-Dining Room Licence
Res #322 Moved by E Fulton
Seconded by M W H Biggar
THAT consideration of the matter of a Dining Lounge Licence for the
Kortright Centre for Conservation be deferred,
AND FURTHER THAT staff be directed to prepare a report for presentation to
the Executive Committee having regard to anticipated operation with such
licence
CARRIED
7 QUOTATION #CLM83-44
-Indian Line Campground Residence/Laundromat
The following quotations were received for the supply of laundry room
equipment and kitchen counters/cupboards for the Indian Line Campground
residence/laundromat
For the supply and delivery of three c01n-operated washers and three coin-
operated dryers
Supplier Amount
Same Day Serv1ce $3,300 00
Thor Industries $3,408 00
Inglis Laundry Equ1pment $3,720 00
-5- B-45l
For the supply and dellvery of required counters/cupboard uni~s/vanities
Supolier Amount
Oakdale Ki~chens $1,962 00
Quallty Wocdworklng 53,200 00
ParlS Kltc!1ens $3,040 00
Nima Kitchens $5,380 00
Prices exclusive of Provinclal Sales Tax
Res #323 ~1oved by H C Lawrie
Seconded by M W H Biggar
THAT the following quotations, for the supply of laundry room equipment and
kitchen counters/cupboards for the Indian Line Campground residence/
laundromat, be accepted, being the lowest acceptable quotations received
Supply and delivery of 3 (three) coin-operated washing machines and 3
(three) cOln-operated dryers Same Day Service - in the sum of $3,300 00,
plus Provlncial Sales Tax,
Supply and delivery of required cupboards, counters, and vanities
Oakdale Kitchens - in the sum of $1,962 00., plus Provincial Sales Tax
CARRIED
8 QUOTATION #CLM83-43
-Albion Hills Conservation Area Washroom/Shelter
The following quotations were received for the supply of roofing materials
and toilet partition doors for the Alblon Hills Conservation Area washroom/
shelter
~
For the supply and delivery of roofing materials 130 bundles 210# asphalt
shingles, and 90 sheets of 3/4" T&G plywood sheathing
Supplier Amount
Unlted Lumber 53,264 80
Hanford Lumber $3,296 50
Card Lumber $3,363 50
Cadillac Lumber Incomplete
"'or the supply, dellvery, and installatlon of toilet partition doors and
requlred grab bars
Suoolier Amount
Columbia Doors & Hardware $l,270 00
Interior Coordinators $1,465 00
Flemming No reply
Prices exclusive of Provincial Sales Tax
Res #:324 Moved by H C Lawrie
Seconded by M W H Biggar
THAT the following quotatlons, for the supply of roofing materials and toilet
partition doors for the Albion Hills Conservation Area washroom/shelter, be
accepted, belng the lowest acceptable quotations received
Supply and dell very of roofing materials United Lumber - in the sum of
53,264 80, plus Provincial Sales Tax,
Supply, delivery, and lnstallatlon of tOllet partitlon doors and required
grab bars Columbla Doors & Hardware - in the sum of 51,270 00, plus
Provincial Sales Tax
CARRIED
B-452 -6-
9 THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION
-Applications to the Canadian National Sportsmen's Fund
Res #325 Moved by Mrs L Hancey
Seconded by M W H Blggar
THAT the submission of applications to The Metropolltan Toronto and Region
Conservation Foundation for funding asslstance for the skating rink at
Black Creek Pioneer Vlllage the establishment of a Kortright Centre for
Conservation Growth Endowment Fund, the preparation of a five-year development
plan for the Forestry Theme at the Kortright Centre the proposal for desiqn
services and exhibit construction for the Forestry Theme at the Kortright
Centre for Conservation, be approved
CARRIED
10 ANNOUNCEMENTS
1 Mrs Hancey, Chalrman of the Personnel Sub-Committee, stated that a
j
meeting of that committee will be held on TUESDAY-DECEMBER-6-1983,
COMMENCING AT 4 00 P M
2 Mrs Gel! informed the members that a reception will be held at the
Kortright Centre for Conservation on Thursday, December 8 1983, from
7 00-10 00 P m to view an exhibition, "Designs in Nature Photography"
and a premiere showlng of slides from the collection of the late
Kenneth W Strasser
3 Mr Fulton advlsed that he had recently circulated a letter. to the
members of the Waterfront Advisory Board advising that the Authority
had been requested by Alderman Tony O'Donohue to proceed as soon as
possible wlth the proposed hydraulic improvements to the mouth of the
Humber Rlver
Mr Fulton's letter stated, in part "Since the hydraulic improvement
has been a component of the Authority's plans for a number of years, it
appears appropriate for staff to proceed with final design preparatlon
and construction as soon as possible ln the new year "
l! TERMINATION
On motlon, the meeting was terminated at l! 25 a m , November 30, 1983
Florence E Gel! W E Jones
Chalrman Secretary-Treasurer
KC
~ B-453
V
the metropolitan toronto and region conservation authority
minutes REPORT #:21/83
EXECUTIVE COMMITTEE 14 -DECEMBER-1983 #21/83
The Execut~ve Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on \iednesday, 14 December, 1983, commenc~ng at 9 30 a m
PRESENT
ChaJ.rman Mrs F E Gell
Vice-Chairman E V Kolb
Members W G Barber
M Ii H Biggar
E Fulton
Mrs L Hancey
H C Lawrie
S A Macpherson
\1s S Nimmo
J S Scott
Mrs N Stoner
MINUTES
Res #326 MO'led by Mrs L Hancey
Seconded by S A Macpherson
THAT the Minu~es of Meeting #20/83 be approved
CARRIED
SECTION I
NO ITEMS
SECTION II
FOR INFORMATION
1 MANVILLE CANADA INC
-Proposal to Rehabilitate Waste Disposal Site
Alderman Jo~n Mackie, City of Scarborough, was present and spoke to this
item
Res #327 Moved by E Fulton
Seconded by Mrs L Hancey
THAT .staff be directed to prepare a brJ.ef, for submiss~on to the Environmental
Assessment Board, outl~n~ng the Authority's concerns with the proposal by
'lanvJ.lle Canada Inc to rehabilJ.tate a portion of che~r exist~ng waste
disposal s~te
THAT appropriate Authority staff and legal counsel attend the Envlronmental
Assessment Board hearing as part~clpants
AND fURTHER THAT Alderman John Mackle, Ward 9, City of Scarborough, be
invJ.ted to consult w~th Authority staff prior to completion of the report to
the Environmen~al Assessment Board
CARRIED
B-454 -2-
2 ~ORTRIGHT CENTRE FOR :ONSERVATION
-D_nino Room LJ.cence
:<es :;:328 '.lo"ed b~ J S Scott
Seconded by ~rs I Stoner
T~A~ c~ns~deration of the [;latter of appllcation for a D~n~ng Room L~cence for
the "ortr~ght Centre for Conservatlon be deferred co the next regular meet~ng
of the Execut~ve Comm~tcee
CARRIED
3 .;PPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #329 Moved by M W H Biggar
Seconded by H C Lawr~e
THAT the appl~cations l~sted here~n as A(1) to A (7 ) inclus~ve, be approved,
subject to the cond~tions contained in the reports
CARRIED
.; (1) Markland Wood Country Club
To undertake streambank eros~on control works on sect~on of the
Etob~coke Creek, north of Dundas Street, City of Etob~coke
In accordance w~th the follow~ng documents and plans which shall form
par c of the permit
A s~te plan and cross sect~on prepared by Markland Wood Country
Club and submitted w~th the applicat~on
.; (2 ) 'hi(~tas Tzembelicos
To undertake constructlon of culvert for extension of Rebecca Court
across tributary of the Don Ri ',er , Town of Vaughan
In accordance with the following documents and pI ans , which shall form
"art of the "erm~t
Draw~ngs Nos 2 and 7, ProJect 202E-79, prepared by
Anton Kikas Limited
A(3) Von-Land Corporat~on Lim~ted
To construct storm water management fac~l~ty for storm sewer system
w~th~n proposed industrial development, Lot 8, Concess~on III. Town
of Vaughan (Don River Watershed)
In accordance with the follow~ng documents and plans, which shall for:n
part of the permit
The following drawings, as prepared by Ander Engineering &
Associates Ltd
82-117-1, Sheet 1 of 2, General Plan,
82-117-2, Sheet 1 of 2, Grading Plan
82-117-8 Sheet I, Spec~al Details
82-117-8, Sheet 2 Special Details
; (4 ) C~ty of York - Parks & Recreat~on Department
To construct pedestrian br~dge across the Black Creek at
Trethewev Park (Humber River Watershed)
In accordance with the follow~ng documents and plans, wh~ch shall form
part of the permit
C~ty of York - Parks & Recreation ;)epartment, Drawing
"os 91 and B2, dated July 1983
-3- B-455
;d 5) City of Scarborough
To cons~r~c~ retaining wall adJacent to creek ea'st of "Iarkham Road,
sou~h c: Pr::aress Court lH1gr.land Creek ..later shed )
In ac::or::lance w1ch c'1e foll::w1~g documents and plans ,....hich shall form
;:art of the perm1:
(a) Location plan and sectlon of retaln1ng wall, prepared by the
appl1cant
(b) Approximate slltation control, as dlscussed with Mr J Tucker
of this office
A(6) Mr James Healey
To construct garage, vicini ty Mill and King Streets, Village of
Bolton, Town of Caledon (Humber River Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
(a) Drawing as prepared by James Healey, and dated November 30, 1983
(b) Pad elevation will be 215 8, as revised, in red, on the plan
.~ ( 7) Vincent & Gino Cavalieri
To construct 4-storey apartment bUlldlng, south of Klng Street,
east of Queen Street, Village of Bolton, Town of Caledon
(Humber Rlver Watershed)
In accordance with the following documents and plans, which shall form
part of the permit
Al 2 3, and 4, ProJect #10-053, prepared by V W Kuchar & Associates,
and dated August, 1983
4 INTERNATIONAL JOINT COMMISSION BIENNIAL CONFERENCE,
NOVEMBER 15 -1 7 1983
-Reeort
Res ;1:330 Moved by Mrs N Stoner
Seconded by E V Kolb
THAT the report on the International Joint Commission Biennial Conference -
15-17 November 1983, together with letter of December 5 1983, directed to
Alderman Tony O'Donohue, P Eng , Chairman of the Metropolitan Toronto Water
Pollution Committee, by W A McLean, Actlng General Manager, be received
c.a.RRIED
5 LAND ACQUISITION PROJECT 1982-1984 HUMBER RIVER WATERSHED
-Property The Municlpality of Metropolitan Toronto
East side Kieling Avenue, north of Steeles Avenue
Res #331 Moved by E V Kolb
Seconded by Mrs N Stoner
THAT the report (December 6, 1983 ) set forth herein, recelved from the
Manager Property & Administrative SerVlces be adopted and that the
Secretary-Treasurer be authorized and directed to complete the purchase
C.I),RRIED
8-456 -4-
Re Project Land Acquis~~ion ProJect 1982-1984 - E"lood
Plain & Conservat~on Land Component Humber
Ri ver 'tla ter shed
.:"ut'1or:. ~y Executive Resolution #88 'teeting #:4 -
.:.. :::>r i 1 3 1981 and Authority Resolu~lon ;;:38,
~ee ting ~3 - 'lay 15 1981
Subject pro~erty East 511e i<i;::ling Avenue north of Steeles
Avenue
Owner The Municipal~ty of Metropolitan Toronto
Area to be acquired 8 250 acres more or less
Recommended purchase price Nom~nal consideration of $2 00
"Included ~n the requ~rements for the above-noted project is an irregularly-
shaped parcel of land, be~ng Part of Lot 40 Concess~on I A I, E" T H , City of
Etobicoke, and Part of the Road Allowance between the City of Etobicoke and
the Town of Vaughan (The Municipal~ty of Metropolitan Toronto), located in the
north-east quadrant of Steeles and Kipling Avenues
"Negotiations have been conducted with officials of The Municipali ty of
Metropolitan Toronto and subject to the approval of your Committee, agreemen t
has been reached with respect to a purchase price, as follows
The purchase price is to be the nom~nal cons~deration of $2 00,
w1th date of complet~ng the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal f~rm of
Gardiner Roberts be ~nstructed to complete the purchase All reasonable
expenses ~ncurred incidental to the closing, for land transfer tax, legal
costs and disbursements, are to be ~a~d The Authority is to rece~ve con-
'leyance 0; the land required free from encumbrance, w~th the exception of
exist~ng 5er~ice easements
Il~he follow~ng clauses are to be included ~n the deed from The "1unicipality
of Metropolltan Toronto to The Metropolltan Toronto and Region Conservation
Authority
'And the said Grantor convenants and agrees to indemnlfy and hold
harmless the Grantee from all losses, costs, and expenses it may
suffer or incur 1n connectlon with any or all injuries, including
death and damages suffered or incurred as a consequence of or in
any way connected with gas ~n on, or upon the lands descr~bed
hereln or any emlssion, release discharge, dispersal, or escape
of such gas from the lands descrlbed herein
And the Grantor covenants with the Grantee that the Grantor will
cover the lands descrlbed herein w~th a suitable turf cover
satlsfactory to the Grantor and the Grantee w~th~n one (1) year
of the date hereof ,
"The Administrator of the Water Resource Division has reviewed thi.s proposed
acqulsit~on and is in concurrence wlth my recommendation
IlAn application has been made to the Ministry of Natural Resources for an
Inspectlon Certificate "
6 WATERFRONT PROJECT 1982-1986
-Survev Equipment
Res ~332 Moved by Mrs L Hancey
Seconded by H C Lawrie
THAT the quotation of Thos Pocklington Llmited, for the supply of one
Sokkisha TM20C Theodolite RED2-EDM, and supportlng equlpment - as
detailed in the quotat~on, at a total cost of $7,200 00, be accepted
C.!\RRIED
-5- B-457
7 KORTRIGHT CENTRE FOR CONSERVATION
-Woodland ?av~lion
Res #333 Moved by :-lrs L Hancey
Seconded by H C Lawrie
~HAT the sta=r be authorized and directed co proceed '.vi th the Noodland
?a'i~lJ.on at t'1e Kortrignt Centre =or Conservat~on as part of che
Canada-Ontario Employment Development (e 0 2 D ) proJect
T!'L, ':' f'-lnds ~n ,:he amount or $9,600 00 allocated to Albion H~lls
Development be transferred ~o the Kortr~ght Centre for Conservation as
.support Costs
AND FURTHER THAT the amount of $38,400 00 be allocated from levy money on
hand to the Kortright Centre for Conservation as part of the Authority
contribut~on to the C 0 E D proJect
CARRIED
8 ALBION HILLS CONSERVATION FIELD CENTRE
-Coat/Mud Area Addition-83
The follow~ng tenders were received for the Coat/Mud Area Addition-83 at
the Albion Hills Conservation Field Centre
Vern Leonard Co Lcd $41 232 00
Cra~ghurst Ltd $42,487 00
Fa~rw~n Construction Co Ltd $46 800 00
Schomberg Construction Ltd $47 300 00
Perw~n Construction Co Ltd $54 700 00
Lisgar Construction Co $58 000 00
~es #334 '1oved by Mrs L Hancey
Seconded I::~ E V Kolb
'I'HAT sub,ect to the written approval of the funding by the Etobicoke Board
of Educa t~on , the contract for the construct~on of the Coad/Mud Area Addition
to the Albion H~lls Conservat~on F~eld Centre be awarded to the Vern Leonard
Co Ltd at ~ts tendered pr~ce of $41,232 00, ~t be~ng the lowest tender
received
CARRIED
9 QUOTATION #83-8(I&E)
-Authoritv General Brochure
.
The follow~ng quotat~ons were rece~ved for the print~ng and supply of 100 000
copies of the Authority's promot~onal brochure
Suppl~er Amount
Haughton Graphics Limi ted $10 725 46
Globe Pr~nting & L~thographing (Toronto) L~mi ted) 10,846 59
Johnstone/Adams Graphics Ltd 10,875 75
~cLaren Morris & Todd Ltd 11 044 80
Consumer Graphics Inc 11,164 99
Panographics Limited 11,503 22
Norgraph~cs (Canada) Limited 11,896 26
F~ne Print 12,22~ 82
General Printers 12,357 00
Charters Litho Inc 12,655 00
Surrey Offset Printers Limited 12,701 01
Welch & Quest Limited 12,906 00
JHF Productions Canada L~m~ ted 13,097 54
Eddygraph Commun~cat~ons Ltd 13,354 00
Double-D Graphics 13 ,410 12
Tibbles Pr~nting Company Limited 13 412 45
Baker Gurney & McLaren Press Ltd 13 615 38
Alexander Lithographers Ltd 13 ,680 00
Arthurs-Jones L~thograph~ng Ltd 13 ,750 00
Blackshaw & Associates L~m~ted 14,240 52
Howell Printing Company Limited 14,656 89
The National Press 14,900 00
Bruce R Potter Agenc~es Ltd 15,464 38
Photra L~m~ted 16,270 00
B-458 -6-
Res #335 Moved by S A Macpherson
Seconded by M W H B~ggar
THAT the quota ion of Haughton Graph~cs L~m~ted for the print~ng and supply
of ll)O 000 cop es of the Author~ty's promotional brochure, ~n the quoted
a::lo"::l":: of $10 25 46 ~nclud~ng Federal and P::"ov~nc~al taxes be accepted
CARRIED
lO PERSONNEL SUB-COMMITTEE
-"eport #:3/83
Res #336 Moved by Mrs L Hancey
Seconded by Mrs N Stoner
THAT Report #3/83 of the Personnel Sub-Committee, as appended as Schedule "All
of these M~nu1:es, be received
AND FURTHER THAT the recommendat~ons, as contained therein, be approved
CARRIED
11 REQUESTS TO THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION
FOR FUNDING ASSISTANCE IN 1984
Res #337 Moved by J S Scott
Seconded by Mrs N Stoner
THAT the Metropolitan Toronto and Reg~on Conservation Foundat~on be requested
to g~ve considerat~on to ra~s~ng funds in 1984 for the following projects
1 Kortr~ght Centre for Conservation
(a) Foyer and Exhibit Floor Layout $10,000 00
(b) \'later Theme $15 000 00
(c) Fish and W~ldl~fe S15,000 00
(d) Wood Arts Centre S12 000 00
2 Black Creek Pioneer V~llage
(a) Nesb~tt Sawm~ll S40,OOO 00
(b) R~chmond Hill Manse and Sawyer's House S20,OOO 00
3 Bruce's Mill Conservat~on Area
Mill Restorat~on $35,000 00
CARRIED
12 OPERATION OF THE GUILD INN AND
LEASE TO METROPOLITAN TORONTO
Res #338 Moved by Mrs L Hancey
Seconded by H C Lawrie
THAT authority be granted to enter into a lease, for a nominal sum, for the
period January 1, 1984 to December 31 1985, with The Munic~pality of
Metropolitan Toronto of approximately 26 5 acres of land, as well as the
bu~ldings and chattels ass9ciated with the Guild Inn which are presently the
subject of a lease with Gu~ldwood Hall, to provide for the operation of the
Guild Inn through the Board of Management for such period
THAT the lease contain such terms and cond~tions as are deemed appropriate by
the Metropolitan Solic~tor the Metropol~tan Commiss~oner of Parks and
Property, the Author~ty's sol~c~tor, and Author~ty staff
AND FURTHER THAT the appropr~ate Author~ty offic~als be author~zed and
d~rected to take the necessary act~on to g~ve effect thereto
CARRIED
-7- B-459
13 QUO~ATION #CL~83-45
-Sale of Surolus Equ~oment
The following q~otations were received for the purchase of t1.vO tractors
~dentified as surplus to Author~ty needs
1974 'lF30 D~esel Tractor 1975 ~l F 13 5
''';~ th E'ront End Loader D~esel Tractor
Don Ward 54,700 00 -
Edwa.rds Equipment $4,000 00 52,750 00
Don Vallance Equ~pment $4,000 00 52,235 00
Nobleton Farm Service 53,000 00 52,200 00
Brian Harrison 52,600 00 Sl,600 00
ties tmetro Ford - -
Res #339 Moved by H C Lawrie
Seconded by E V Kolb
THAT the bid received from Don Ward for the sale of one 1974 MF30 Diesel
Tractor w~th Front End Loader and 8' blade, one set of chains, and Sims cab,
in the sum of S4,700 00, be accepted ~t being the highest bid received
AND FURTHER THAT the bid received from Edwards Equipment for the sale of one
1975 MF135 Diesel Tractor complete with roll-over protection, in the sum of
$2,750 00 be accepted it being the highest b~d rece~ved
CARRIED.
14 ACCOUNTS FOR THE PERIOD
OCTOBER-31 TO DECEMBER 4, 1983
Res #340 Moved by H C Lawrie
Seconded by E V Kolb
THAT accounts aggregat~ng S2 083 353 00, for the period October 31, 1983 to
December 4, 1983, be approved for payment
CARRIED
15 QUOTATION #CLM83-46
-Indian Line Control Bu~lding/Supervisor's Res~dence
The follow~ng quotations were received for the supply of furnishings for the
Indian Line Campground Supervisor's res~dence
Supply and delivery of one 30" stove and one 15 cu ft refr~gerator
Eaton's S 958 00
Galloways 1,178 00
Woolco 1,298 00
Supply and delivery of chesterfield upholstered chair, bed-chesterfield,
din~ng room set, and coffee table
Eaton's $4 359 00
Simpson's 4,645 00
Ikea N/A
Supply and del~very of bedroom furn~ture for Superv~sor's residence
Simpson's Sl,997 00
Eaton's 2-,240 00
Ikea N/A
Supply and del~very of kitchen table and cha~rs bookcase chest-of-drawers
and coffee table for the Ass~stant Supervisor's residence
Ikea Sl,051 00
Simpson's 1 178 00
Eaton's N/A
All of the above prices exclusive of P~ovinc~al Sales Tax
6-460 -8-
Res #341 'loved by H C Lawrie
Seconded by E V Kolb
THA~ the following ~uotat~ons for appl~ances and furniture required for the
I~d~an L~'e :ampground Supervisor'5 and A5sistant Superv~sor's res~dences ce
accepted, c~ey be~ng the lowest quo:at~cns rece~ved
E3tOn s - fer the supply of a 30" manual-clean stove and 15 cu ft
=~ost-free refr~gerator, ~n the sum of S958 00 plus ?rovinc~al Sales
~ax and for the supply of one chesterfield one bed-chesterf~eld
one upholstered cha~=, d~n~ng room set and coffee table in the sum
of S4,359 00, plus Prov~nc~al Sales Tax
S~mpson's - for the supply of bedroom furniture for the Superv~sor's
res~dence (only) ~n the sum of Sl,997 00, plus Provincial Sales Tax,
Ikea - for the supply of kitchen table and chairs, bookcase/chest-of-
drawers, coffee table for the Assistant Supervisor's residence, in the
sum of $1,051 00, plus Provincial Sales Tax
CARRIED
16 QUOTATION #CLM83~47
-Albion Hills Washroom/Shelter
The following quotations were rece~ved for the supply and delivery of
materials required for the Albion Hills Washroom/Shelter complex
Supply and dell very of approx~mately 1,200 sq ft of Un~cobble (colourmix
brown)
?erma Pav~ng Stone Sl 194 12
Int~rlock~ng Pav~ng 1 566 48
. Un~lock Ltd 1,733 40
includ~ng Prov~ncial Sales Tax
Supply and del~very of approx~mately 700 sq ft of floor tile base trim,
and grout material
Sole Tile Sl,700 00
Moscone Tlle 1,903 00
Olympia Tlle 2 064 00
Prov~ncial Sales Tax extra
Res #342 Moved by H C Lawrie
Seconded by E V Kolb
THAT the quctat~on of Perma Paving Stone for the supply and delivery of
approximately 1 200 square feet of Unicobble floorlng surface for the Albion
Hills Picnic Shelter in the sum of Sl 194 12, including Provinclal Sales
Tax, be accepted, ~t being the lowest quotation recelved
AND FURTHER THAT the quotatlon of Sole Tile, for the supply and delivery of
approximately 700 square feet of floor tile and trim for the Albion Hills
washroom, in the sum of Sl 700 00, plus Provinclal Sales Tax, be accepted ~t
belng the lowest quotation rece~ved
CARRIED
17 QUOTATION #CLM83-48
-Cold Creek Conservatlon Area Entrance Sign
The followlng quotat~ons were rece~ved for the supply and delivery of 12"
plywood lettering, with plast~c face, requ~red for the above-noted slgn
Harrison Bros Sl,l17 32 (+ PST)
Sunny Plast~cs N/A
Signs and Service N/A
-9- B-46l
Res '*343 Moved by H C Lawrle
Seconded by E V Kolb
TH;~ ~he quoca~_on :Jf :-!ar~~son 3ros for 12" plywood letterlng f:)r the
;::old Creek Conae.c atlon Area entr3nce s~gn in the sum of Sl ll~ 32, plus
?r:;'J~'c~al Sa_es !a,< ~Q ac(;:e,ned It be~ng the or.l~ quotati:>n rece~\ed
CA~RIED
18 ANNOUNCEMENTS
1 The Chairman ~nformed the members, with deep regret, of the death of
Mr Spencer Ii Caldwell by automobile accident on Saturday December 10th
A memor~al service, at which the Authority will be represented, is to be
held on a date not yet announced
2 The Act.lng General ~anager expressed apprec~ation on behalf of all of
the 5taff for the support and co-operation received from the Executive
Comm~ttee and the full Author~ty dur~ng 1983
19 TER~I'lATION
On motion the meet~ng Has terminated at 11 25 a m November 30, 1983
Florence E Gell W E Jones
Chalrman Secretary-Treasurer
KC
B-462
SCHEDULE IIA-II
TO The Chairman and Members
Execut~ve Comm~ttee M T R C A , #21/83
FRG:-l ~Ir s LOls Hancey,
Chalrman, Personnel Sub-Committee
~E REPORT =3/83
PERSO~~EL SUB-COMMITTEE
TP.E SUB-COMMITTEE RECOM~IENDS THAT
1 (a) The 1984 class level ranges of salary/wages (Appendix 1 hereto)
be approved,
(b) The 1984 hourly wage rates for supplementary staff (Appendix 2
hereto) be approved
(c) The dental plan be up-graded from the 1980 dental fee schedule
to the 1983 fee schedule, subject to the regulations of the
Public Sector Waqe and Prlce Restraint Act
2 The up-dated Authority Clothing Policy (Appendix 3 hereto) be
approved
3 Personnel Pol~c~es B-1 "Group Insurance Plans, and B-2 "Short Term
Disablli ty" be amended t~ permit coverage for major medical,
dental and short term d~sab~lity for probat~onary employees
(Appendix 4 hereto)
~
4 The following 1983 appoint:ments and reclassificat~ons within the full-
time and full-tlme probationary stafE be approved
Reclass~ficat~ons w~th~n the Full-Time Staff
J Berry Superintendent Ii R SMl March 1
R Marinzel Asst Superintendent W R GF3 February 1
J Hon~ngh Asst Superintendent C L M GF3 January 1
R Wa~nwr~ght Lead Hand C L M GF2 February 27
J Clarke Admin~strative Asst , F & A G04 October 3
Pr~nt & Ma~l Room
Acpo~ntments to Full-Time Staff
T Maclean Admlnistratlve Clerk I & E G02 July 1
M Jur~ma Foreman H S GF3 July 1
S Robinson Artisan H S GF3 January 1
S Chang Accounting Clerk F & A G02 March 1
-Payables
R Hill Supervisor, F & A SMl January 1
Accounting Servlces
B Rundle Accounting Assistant F & .1\ G03 January 1
K MacDonald Personnel Officer S S TP4 September 1
Appointments to Probationary Staff
L D Field Manager, Planning & W R SM4A December 19
Env~ronment
M Fenn~ng Property Ass~stant F 6. A G03 November 21
7-December-1983
KC
B-463
APPENDIX 1
( 1 )
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SCHEDULE B contd. Executive Mtg.
Resolution No.
SALARIES/NAGES Date.
1984 CLASS LEVEL RANGES
Hourlv Rate
Class Mid Job Mld Job
Level Entrv Point Rate Entrv Point Rate
G01 14,601 15,412 16,224
G02 15,915 16,799 17,683
G03 18,908 19,958 , 21,009
G04 20,610 21,755 22,901
G05 22,466 23,713 24,962
GF1 18,908 19,958 21,009 9.06 9.56 10.07
GF2 20,610 21;755 22,901 9.88 10.42 10.97
GF3 22,466 23,713 .. 24,962 10. 77 11.37 11.96
GF4 26,692 ~8,175 29,657 12.79 13.50 14.21
I I
I ~~~ 17,348 I /18,311 19,275
21,767 23,127 24,488 25,848 27,209
TP3 25,862 27,477 29,093 30,710 32,326
TP4 30,725 32,647 34,566 36,486 38,407
SM1 23,726 25,208 26,692 128,175 29,657
SM2 28,187 29,949 31,711 33,473 35,235
SM3 30,725 32,647 34,566 36,486 38,407
SM4A 33,491 35,583 37,677 39,770 41,864
SM4B 36,504 38,790 41,067 43,349 45,630
SM5A 38,489 40,775 43,051 45,334 47,614
SM5B 39,790 42,276 44,764 47,250 49,737
SM5C 43,371 46,082 48,794 51,504 54,215
SM5D 47,274 50,229 53,184 56,138 59,093
SM5E 51,529 54,750 57,971 61,191 64,411
- 50 -
B-464
APPENDIX 2
( 2
THE METROPOLITAN TORONTO ~ND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SCHEDULE 9 contd. Executive Mtg.
Resolution No.
SALARI ES/fN'AGES Date.
1984 Wage Rates - Suop1ementary Service Staff
Students (under 18) Jan.1/84 $2.65 - 3.00/hr.
*Mar.l/84 3.00 - 3.3S/hr.
*Oct.l/84 3.15 - 3.S0/hr.
Students (over 18) Jan.1/84 3.50-4.00-4.50-S.00-5.50/hr.
*Mar.l/84 3.85-4.00-4.50-5.00-5.50/hr.
*Oct.l/84 4.00-4.50-S.00-5.50/hr.
* reflects increase to minimum wage legislation.
Student rates are applicable to those supplementary employees who
are currently students, or who have been students within the four
month period preceding the date of hire. These rates do not apply
to recent post-secondary graduants. Rates apply to students
performing general service duties such as gate/building attendants,
shop sales/rentals, or unskilled labour.
General Service (non-student)
(gate/building attendants,
cleaners, unskilled labour) $4.00-4.50-S.00-S.50-5.75/hr.
Labourer (machinery experienced) $7.70
Lead Hand (seasonal) $8 .25
Senior Clerk $7 . 70 - 8.25
Gift shop sales (seasonal) $6.15-6.95-7.70
Gift shop sales (part-time) $5.10-5.60-6.15
1984 Wage Rates - Supplementary Program Staff
Recreation Programs
Campground Supervisor (Albion) $76-80.00/diem
Campground Supervisor (Claireville) $80-84.00/diem
Recreation Program Coordinator $59-64.00/diem
Assistant Recreation Program Coordinator $6.85-7.15/hr.
- 51 -
B-465
(3 )
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SCHEDULE B contd. Executive Mtg.
Resolution No.
SALARIES/WAGES Date:
1984 Wage Rates - Supplementary Program Staff contd.
Recreation Proarams contd.
~
Recreation Program Instructor $6.SS-6.BO/hr.
Lead Hand, Recreation (GF 2 ) $9.88-10.42 10.97/hr.
Water Safety Coordinator $S9-64.00/diem
Head Lifeguard, Range Officer $5.65-5.95/hr.
Assistant Lifeguard $4.B5-5.25/hr.
Lifeguard, ~atroller $4.40-4.70/hr.
Education Programs
Education Program Coordinator $61-67.00/diem
I
Education Assistants (Level I) $25-27-29.00/diem
Education Assistants (Levels II - IV) $40-45-51-58.00/diem
Guest Lecturers $60. to $200./diem
Interpreter/Artisan Programs
Administrative Assistant, Interpreters $9.88-l0.42-10.97/hr.
Interpreter/Artisan (seasonal) l. $9.88-10.42-l0.97/hr.
2. $10.77-1l.37-1l.96/hr.
Artisan (part-time) $6.55
Interpreter (seasonal) $6.85-7.l5-8.l0-8.65/hr.
Interpreter (part-time) $5.50
Technical Positions
Technical (undergraduate) $5.65-5.95-6.30/hr.
Technical (graduate) (TP) * $9.S0-l0.0S-10.S5/hr.
* where greater skills are required, other TP levels may be used.
- 52 -
8-466
(4 ;
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL ~ANUAL
SCHEDULE B contd. Executive M~g.
Resolution No.
SALARIES/NAGES Date:
1984 Wage Rates - Supplementary Food Service Staff
* note changes to minimum wage legislation:
(under 18) Mar. 1/84 $3.00/hr.
Oct. 1/84 3.15
(over 18) Mar. 1/84 3.85
Oct. 1/84 4.00
Under 18 Over 18
Bus Person Level I *$2.65-3.00/hr. *$3.50-3.90-4.20/hr.
Cleaners Level II *$2.65-3.00 /hr. *S3.50-4.l0-4.45/hr.
Counter Server Level I *$2.65-3.00/hr. *$3.50 (lead hand 4. 20 )
Naiter/Waitress Level II *$3.50 + tips
(leadhand 4.20)
Cashier, Snack Bar Level I $3.90-4.45-4.70
Cashier, Full Service Level II $3.90-4.70-4.95/hr.
Bartender $4.20-4.95-5.75/hr.
Assistant Cook *$2.65-3.00/hr. *$3.50-4.70-5.25/hr.
2nd Cook Level I $5.50-7.35/hr.
1st Cook Level II $7.35-l0.50/hr.
Unit Assistant Level I $4.50-S.75-6.80/hr.
Unit Assistant Level II $6.80-7.35-7.90/hr.
Unit Assistant Level III $365.-385.-405./wk.
Area Assistant S365.-385.-405./wk.
- 53 -
APPENDIX 3- B-467
CLOTHING POLICY ( 5 )
In :ecognition of the public service nature of the work of the
Authority, and in order that Authority staff are easily identifiable
by the public, Authority uniforms or special costumes must be worn
by designated staff while carrying out their normal work duties~
Division ~dmini3trators are responsible for establishing the type of
unifor~ or costume to be worn by members of their staff.
Uniforms or costumes can be obtained from the Authority on either a
free issue or half price issue basis as detailed below. Employees
are responsible for the care and upkeep of uniforms or costumes.
Except for travelling to and from work, clothing which displays
Authority identification is not to be worn during off duty hours.
FREE ISSUE
Dress Uniform: ,
, .
Consists of - 1 blazer, dark brown with circular crest on
left pocket.
2 pairs beige pants or 2 beige skirts
3 shirts or blouses with shoulder flashes and
position ensignia .
I
2 ties, dark brown
For the purpose of th is policy, the above uniform is available to
the following categories of Regular Staff if deemed appropriate by
the Division Administrator.
Supervisor, Conservation Education (KCC , FC)
Manager of operations, ( BCPV)
Supervisors, in SM2 Classification
Superintendents, in SMl Classification (except Superintendent
Enforcemen t)
Curator, (KCCl
Safety Officer
Assistant Superintendents, Conservation Areas
Casual Oniform:
Consists of - z~ppered tunic, dark brown with shoulder
flashes and position ensigna
2 pairs dark brown pants
(above items wash and wear)
3 shirts or blouses with shoulder flashes and
position ensignia
2 ties, dark brown
8-468 Clothing policy
page -2 (6
For the purpose of this policy, the above uniform is available to
the following categories of Regular Staff if deemed appropriate by
the Division Administrator.
Supervisor, Conservation Education (KCC, FC)
Manager of Operations (3CPV)
Superintendents, in SM Classification (except Superintendent
Enforcernen t)
Curator n(CC)
Safety Officer
Technician, Resource Management
Forex.nan, Resource Management
Foreman (BCPV)
Dam Operator
Building Superintendent, I & II
Assistant Superintendents, in GF3 Classification
Lead Hand
Enforcement Uniform:
Winter - 1 tunic, dark brown (long - dress)
1 tunic, dark brown (short - casual)
2 pair beige pants
3 shirts, ~ong sleeves with shoulder flashes and
position ensignia
Summer - 1 tunic, dark brown (short)
2 pair pants, dark brown .
~
3 shirts, short sleeve with shoulder flashes and
position ensignia
(above items wash and wear)
( NOTE: Shirts and tunics complete with epaulets, crown buttons~ sam
brown and regular belt loops on pants) .
In addition to above, the following accessories are also provided:
- 2 ties - dark brown
- sam brown belt
- epaulet covers
- 1 dark brown peaked hat (summer) and 1 fur hat (w in t e r )
- Footwear, 1 pair/year of either boots or shoes, CSA green
patch standard.
This uniform is provided to Enforcement Staff.
-
In addition to all uniform styles identified, those staff noted are
also entitled to a nylon parka;
and for those positions which by nature of duty require considerable
outside 'o'Iork in periods of inclement weather, 1 rain coat.
Clothing policy 8-469
pag e -3
( 7 )
Special Clothing
Certain Authority operating locations (e.g. Black Creek Pioneer
Village) and jobs (e.g. Li feguard s) require special articles of
clothi'g to properly identify staff. Division Administrators
dete=mine locations and jobs requiring such items, decide the type
of clothing to be worn and set wearing standards.
special clothing is nFree Issuen to employees, who are :esponsible
for the care and are required to return all items issued, clean and
in good repair, at the termination of employment.
In addition to costumes, the Authority provides employees with
safety protection articles, except footwear, on a npree Issuen
basis. Employees must wear the necessary safety clothing required
to perform the job in compliance with the Occupational Health and
Safety Act. Safety items (excep~ hard hats) remain the property of
the Authority and must be returned, clean and in good repa~r, at the
termination of employment.
Employees who fail to return items or who return damaged or
uncleaned items, may be assessed cost incurred by the Authority.
HALF PRICE ISSUE
<\0
Work Uniform:
Consist of - dark brown pants and zippered windbreaker and
beige shirt or blouse complete with shoulder
flashes. May also include position ensignia.
Also available as part of work clothing, are
dark brown coveralls, work parka, T-shirts and
hats (summer and winter) . These items are
available to:
REGULAR STAFF - General Pield and Technical Professional
categories, whose job requires a large percentage of time in
the field and in contact with the general public. Quantities
are available as follows:
- 3 pair work pants
- 3 work shirts/blouse
- 2 windbreakers
- 2 coveralls
- 1 winter parka
- 1 winter cap
- 2 summer caps
- 3 T-shirts
-
1470 Clothing policy
pag e -4
( 8
REGULAR STAFF - Technical Professional and Supervisory
Management categories, whose job requires occasional field
work and contact with the general public. Quantities are
available as follows:
- 1 pair work pants
- 1 shirt or blouse
- 1 'tJindbrea:<er
- 1 pair coveralls
- 1 T-shirt
- 1 summer cap
- 1 winter cap
- 1 nylon or work parka
SUPPLEMENTARY STAFF, whose job requires a large percentage of
time in the field and contact with the general public.
Quantities are available as follows. Winter wear only
available when staff employed regularly through winter
period. ,
- 2 work pants
- 3 shirts or blouses
- 1 'Ilindbreaker
- 1 patr coveralls
- 3 T-shirts
- 2 summer caps
- 1 work parka
- 1 winter cap
SU?PL~~NTARY STAFF, hired under special programs or whose
work is of a short duration. Quantities are available as
follows. Winter wear only available when staff emplopyed
regularly through winter period.
- 2 pair work pants
- 2 shirts or blouses
- 1 windbreaker
- 2 T-shirts
- 1 summer cap
- 1 winter cap
- 1 work parka
Safety Footwear
Regular Staff
Categories whose job requires footwear to be worn which meet safety
legislation requirements will be provided with a contribution of 50%
of the cost, to a maximum of $3D.OO per pair. Initial issue will
consist of 1 pair of summer and 1 pair of winter safety footwear
meeting the CSA green patch standard. This standard requires
footwear to have both a steel toe and a puncture resistant sole.
Clothing policy
Page -5 B-471
Supplementary Staff (9 )
Categories whose job requires footwear to be worn which meet safety
legislation requirements will be provided with a contribution of
$10.00 towards the cost. This contribution usually applies to a
summer pair but may also include an additional contribution of
~10.00 to',o/ard the cost of winter root'o'iear if necessitated 'oy the
?eriod of employ~ent. ?ootwear to qualify must ~eet the CSA
green patch standard. T~is standard requires foot',iear to ha ve ooth
a steel toe and a puncture resistant sole.
REPLACEMENT POLICY
The care of uniforms, footwear or other articles of clothing issued
by th~ Authority to employees either free of charge or on a shared
cost basis is a responsibility of the employee. Replacement of
articles on the same basis as originally issued may be obtained when
articles are no longer serviceable. For purposes of administering
this policy, determination of serviceable is a responsibility of the
employee's immediate supervisor.
.
1983.11.18.
B-472 APPENDIX 4
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL MANUAL
SECTION B - EMPLOYEE BENEFITS Executive Mtg.
PERSONNEL POLICY B-1 Resolution No.
GROUP INSURANCE PLAN Date:
(1 ) Regular employees shall be eligible for the following benefits:
(a) MAJOR MEDICAL EXPENSE
100% coverage for eligible expenses and eligible dependents
and a yearly deductible of $25.00 per individual or per
family appl ies;
(b) DENTAL EXPENSE
100% coverage for eligible expenses and eligible dependents
based on the 1980 Ontario Dental Association Fee Guide;
(2 ) Full-time employees shall be eligible for the following
benefits:
(c) LIFE INSURANCE
An amount of insurance equal to 200% of annual earnings to
a maximum of $100,000.00 will be paid to the employee's
estate or beneficiary;
(d) ACCIDENTAL DEATH AND DISMEMBERMENT
Coverage equal to the amount of life insurance;
(e) SEMI PRIVATE HOSPITAL CARE.
( 3 ) The employer shall pay 100% of the monthly premium for Group
Insurance Plan benefits
- 17 -
B-473
(11
THE METRO~O~ITAN TORONTO AND REGION CONSERVATION AUTHORITY
~ERSONNE~ MANUA~
SECTION 8 - EM~LOYEE BENEFITS Execut i ~'e Mtg.
PERSONNE~ POLICY 3-2 Resolution No.
SHORT TZR~ D!5~3ILITY Date:
(1) This plan replaces the sick leave plans that were in effect
prior to January 1, 1981.
..
(2) Effective January 1, 1981, a regular employee shall, in the
event of continuous illness or disability, be eligible to
rec~ive salary or wages for lS weeks as follows:
(a) first two weeks at 100% of regular gross earnings;
(b) weeks three to lS at 7S% of regular gross earnings.
(3) Th~ 75% payment can be supplemented to 100% from sick leave
credits accumulated to December 31, 1980.
(4) Those employees with an accumulation of sick leave credits to
December 31, 1980, will be paid on termination an amount
determined by:
(a) length of service;
(b) type of sick leave plan in effect on employment date.
(5) An employee absent from work on short term disability may be
required to submit a medical certificate covering the nature
and duration of the illness.
-
- 18 -
.
~ B-474
V
the metropolitan toronto and region conservation authority
minutes REPORT #22/83
EXECUTIVE COMMITTEE ll-JANUARY-1984 #22/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 11 January, 1984, commencing at 9 30 a m
PRESENT
Chairman Mrs F E Gell
Vic:e-Chairman E V Kolb
Members W G Barber
M Ii H Biggar
E Fulton
Mrs L. Hancey
H C Lawrie
S A Macpherson
Ms S Nimmo
J S Scott
Mrs N Stoner
Authority Member J A Bryson
An 'in camera' session was held on "The Metropolitan Toronto and Region
Conservation Authority Rev~ew"
Res. #344 Moved by M W H Biggar
Seconded by W G Barber
THAT Mr John P Kruger be thanked for his presentation of the draft report "Metro
Toronto and Region Conservat~on Authority Review (November 1, 1983)"
CARRIED
It was agreed that a special meeting of the Executive Commlttee be held on
'londay, January 16, 1984, commencing at 10 00 a m for discussion of the above
report
DECLARATIONS
Mr Fulton declared a conflict concerning Item 10 of these Minutes, and did not
partlcipate in discussion or vote on the item
MINUTES
Res #345 Moved by H C Lawrie
Seconded by W G Barber
THAT the Minutes of Meeting #21/83 be approved
CARRIED
SECTION I
FOR CONSIDERATION
1 THE LATE SPENCER W CALDWELL
Res #346 Moved by E V Kolb
Seconded by H C Lawrie
WHEREAS Spencer W Caldwell was appointed by the Government of the Province of
Ontario as a member of The Metropolitan Toronto and Region Conservation
Authority from April, 1976 to February, 1983, serving on the Reforestation and
Land Use Advisory Board, the Conservation Land Management Advisory Board, the
Information and Education Advisory Board, the Humber Valley Advisory Board,
and the Conservation Farm Sub-Committee, .
B-475 -2-
AND WHEREAS he was appointed by the Authority to serve on the Conservation
Land Management Advisory Board and the Conservation Farm Sub-Committee from
February, 1983 to February, 1984
AND WHERE Mr Caldwell was a member of The Metropolitan Toronto and Region
Conservation Foundation from 1967 to 1970, a director from 1971 to 1972, a
member in 1973, a director from 1974 to 1977, and a member from 1978 to 1981,
AND WHEREAS his constancy and devotion to the principles of conservation, and
his love of the land and living things, have encouraged and strengthened the
aims and objectives of the Authority,
THEREFORE THE EXECUTIVE COMMITTEE RECOMMENDS THAT on the sad occasion of the
death of Mr Spencer W Caldwell on Saturday, December la, 1983, the deepest
sympathy of the members and staff of The Metropolitan Toronto and Region
Conservation Authority be conveyed to Mrs Nancy Caldwell,
AND FURTHER THAT the invaluable contribution made by Mr Caldwell during his
years of service with the Authority be gratefully acknowledged
CARRIED
2 REPORT #5/83 - FLOOD CONTROL AND
WATER CONSERVATION ADVISORY BOARD
Res #347 Moves'! by J S Scot t
Seconded by Mrs L Hancey
THAT Report #5/83 of the Flood Control & Water Conservation Advisory Board
be received,
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations #1 and #2, as set
forth herein, be approved
#1 The Project for the Dredging of the Keating Channel, Don River,
1984-1985, as appended as Schedule "A" of these Minutes, be adopted,
And Further That the following action be taken in connection therewith
(a) The Municipality of Metropolitan Toronto be designated as the
benef~ting municipality on the basis set forth within the
project
(b) The Government of the Province of Ontario be requested to
approve the project and a grant of 55% of the cost thereof,
(cl Pursuant to Section 24 of the Conservation Authorities Act,
approval of the Ontario Municipal Board be requeste~,
(d) Implementation of the project be conditional upon the other
participants - The Toronto Harbour Commissioners and the
Federal Government - approving their share of the funding,
(el When approved, the appropriate Authority officials be
authorized to take whatever action is required in connection
with the project, including the execution of any documents
#2 The Project for Channel Improvements on the East and West Branches
of the Hlghland Creek, 1984-1986, as appended as Schedule "B" of these
Minutes be adopted,
And Further That the following action be taken in connection therewith
(al The Municipality of Metropolltan Toronto be designated as the
benefiting municipality on the basis set forth in the proJec~,
(b) The Government of the Province of Ontario be requested to
approve the proJect and a grant of 55% of the cost thereof,
(cl Pursuant to Section 24 of the Conservation Authorities Act,
approval of the Ontario Municipal Board be requested,
(dl When approved, the appropriate Authority offic~als be authorized
to take whatever actlon is required in connection with the
project, including the executlon of any documents
CARRIED
-3- B-476
3 STATUTORY RESOLUTIONS FOR THE TWENTY-EIGHTH
ANNUAL MEETING OF THE AUTHORITY
Res #348 Moved by W G. Barber
- Seconded by H C Lawrie
THAT the draft of Statutory Resolutions prepared for the Twenth-Eighth Annual
Meeting of the Authority be received,
AND THE EXECUTIVE COMMITTEE RECOMMENDS THAT the follow~ng Statutory
Resolutions be adopted at the Twenth-Eighth Annual Meeting of the
Authority, scheduled for February 17, 1984
(a) Aopointment of Auditors
THAT Clarkson, Gordon & Company be re-appointed as Auditors of
the Authority for the year 1984,
(b) Borrowinc Resolution - 1984
WHEREAS it is necessary for The Metropolitan Toronto and Region
Conservation Authority (hereinafter called 'the Authority') to
borrow up to the sum of FIVE MILLION DOLLARS ($5,000,000 00 )
required for its purposes until payment to the Authority of any
grants and of sums to be paid to the Authority by the participating
municipalities designated as such under The Conservation Authorities
Act, R S 0 1980, Chapter 85, as amended,
BE IT THEREFORE RESOLVED
1 THAT the Authority may borrow from The Royal Bank of Canada or
the Authority's member municlpalltles up to the sum of FIVE
MILLION DOLLARS ($5,000,000 00 ) necessary for its purposes on
the promissory note or notes of the Authority until payment to
the Authority of any grants and of sums to be paid to the
Authority by participating municipalities at such rate of
~nterest as the Minister of Natural Resources approves,
2 THAT the signing officers of the Authority are hereby authorized
to execute for and on behalf of the Authorlty a promissory note
or notes for the sum to be borrowed under paragraph numbered 1
hereof and to affix thereto the Corporate Seal of the Authorlty,
3 THAT the amount borrowed pursuant to this resolution, together
wlth interest thereon at the rate approved by the Minister of
Natural Resources, be a charge upon the whole of the monies
received or to be received by the Authority by way of grants as
and when such monies are received and of sums received or to be
received by the Authority from the partic~pating municlpalities
as and when such monies are received,
4 THAT the signlng officers of the Authority are hereby authorized
and dlrected to apply, in payment of the mon~es borrowed pursuant
to this resolution, together with interest thereon at the rate
approved by the Minlster of Natural Resources, all monies
recelved by the Authority by way of grants or sums received by the
Authorlty from the partic~pating municipalities
CARRIED
4 SCHEDULE OF MEETINGS - 1984
Res #349 Moved by M Ii H Biggar
Seconded by E V Kolb
THE EXECUTIVE COMMITTEE RECOMMENDS THAT the proposed Schedule of Meetings for
1984, as set forth herein, be adopted
FEBRUARY l7-MARCH 2 (Adopted with 1983 Schedule)
FRIDAY FEBRUARY 17 9 30 A M AUTHORITY TWENTY-EIGHTH ANNUAL
Wednesday February 22 9 30 a m Executive #1
FRIDAY MARCH 2 9 30 A r:l AUTHORITY #2 (BUDGET)
B-477 -4-
1984
Wednesday March 7 9 30 a m Executive #2
Wednesday March 21 9 30 a m Executive #3
APRIL
Wednesday April 4 9 30 a m Executive #4
Wednesday April 18 9 30 a m Executive #5
MAY
Wednesday May 2 9 30 a m Executive #6
FRIDAY MAY 4 9 30 A M AUTHORITY #3
Wednesday May 16 9 30 a m Executive #7
Wednesday May 30 9 30 a m Executive #8
JUNE
Wednesday June 13 9 30 a m Executive #9
FRIDAY JUNE l5 9 30 A M AUTHORITY #4
Wednesday June 27 9 30 a m Executlve #10
JULY
Wednesday July 18 9 30 a m Executive #11
AUGUST
Wednesday August 15 9 30 a m Executive #12
Wednesday August 29 9 30 a m Executive #13
SEPTEMBER
Wednesday September 12 9 30 a m Executive #14
Wednesday September 26 9 30 a m Executive #15
OCTOBER
Wednesday October lO 9 30 a m Executive #16
FRIDAY OCTOBER 12 9 30 A M AUTHORITY #5 (PRELIM BUDGET)
Wednesday October 24 9 30 a m Executive #17
NOVEMBER
Wednesday November 7 9 30 a m Executive #18
Wednesday November 21 9 30 a m Executive #19
DECEMBER
Wednesday December 5 9 30 a m Executive #20
Wednesday December 19 9 30 a m Executlve #21
JANUARY, 1985
Wednesday January 9 9 30 a m Executive #22
Wednesday January 23 9 30 a m Executlve #23
-5- B-478
FEBRUARY, 1985
FRIDAY FEBRUARY 8 9 30 A M AUTHORITY TWE~TY NINTH ANNUAL
Wednesday February 20 9 30 a m Executive #1/84
MARCH, 1985
FRIDAY MARCH 1 9 30 A M AUTHORITY #2 (BUDGET)
ADVISORY BOARD, SUB-COMMITTEE, AND ANY OTHER MEETINGS REQUIRED WILL BE
HELD AT THE CALL OF THE CHAIRMAN CONCERNED
(The following Statutory, Designated, and other holidays, school breaks,
conference and convention dates are noted for information
SCHOOL SPRING BREAKS* MARCH 12 - 23
PASSOVER APRIL 17 - 18
GOOD FRIDAY/EASTER MONDAY APRIL 20 - 23
VICTORIA DAY MAY 21
FED OF CANADIAN MUNICIPALITIES, WINNIPEG JUNE 3 - 7
DOMINION DAY JULY 2
CIVIC HOLIDAY AUGUST 6
ASSOC OF MUNICIPALITIES OF ONTARIO, TORONTO AUGUST 19 - 22
LABOUR DAY SEPTEMBER 3
BIENNIAL CONFERENCE OF CONSERVATION AUTHORITIES SEPTEMBER 16 - 19
ROSH HASHANAH SEPTEMBER 27
THANKSGIVING OCTOBER 8
HANUKKAH DECEMBER 19
CHRISTMAS DAY/BOXING DAY DECEMBER 25-26
NEW YEAR'S DAY JANUARY 1, 1985
*Two weeks are lndicated for school breaks in schedules of Metropolitan
Toronto and several other municipal~ties )
CARRIED
SECTION II
FOR INFORMATION
5 BUSINESS ARISING FROM THE MINUTES
KORTRIGHT CENTRE FOR CONSERVATION
-Dlning Room L~cence
Res #350 Moved by \1rs L Hancey
Seconded by S A Macpherson
THAT staff be directed to make appllcation to the Liqour Licence Board of
Ontario for a Dlnlng Lounge Licence for the Kortright Centre for
Conservat"-on
CARRIED
6 CORRESPONDENCE
Mr Ii A McLean, Acting General Manager, reported receipt of the following
correspondence
(a) Letter dated December 22, 1983 from the Minister of Tourism & Recreation,
advlsing that the Authorlty has been awarded" financial assistance to
conduct your w~nter youth employment project as part of the Experience '83
Program 4201 A grant cheque in the amount of 55,163 00 for the funding
of 2 youths will be forwarded to your organization within the next few
weeks "
(b) Letter dated December 28, 1983, from the Minister of Tourism & Recreation
to the Foundatlon, approving a grant of $5,000 00, which will be used
for the lnstallation of an audio tour system along the newly-developed
Forestry Theme interpretive trail
7 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #351 Moved by Mrs N Stoner
Seconded by Mrs L Hancey
THAT the applications listed hereln as A(l) to A (3 ) inclusive, be approved,
subject to the conditions contained in the reports
CARRIED
B-479 -6-
A (1) Town of Markham
To construct two storm water management ponds on Part Lots 11 & 12,
Concession IV, Town of Markham (Rouge River Watershed)
In accordance with the following documents, which shall form part of the
permit
(a) "Design Brief Stormwater Management Facilities Study Area lC"
prepared by Cosburn Patterson & Associates Ltd , and dated
September 1983,
(b) Drawings entitled "Study Area lC" accompanying the above brief,
dated August 1983, and including Drawing Nos 53, 56, 57, 58, 59,
and 60
A (2) Markland Wood Country Club
To undertake stream bank erosion control works south of Bloor St West,
City of Etobicoke (Etobicoke Creek Watershed)
In accordance with the following documents and plans, which shall form part
of the permit
A site plan and cross section prepared by Markland Wood Country Club
and submitted with the application
A (3) Frenchman's Bay Yacht Club
To place fill , vicinity of Frenchman Bay, Town of Pickering
(Waterfront)
In accordance with the followlnq documents and plans, which shall form
part of the permit
(a) All fill will be placed on the area indicated on the Authority's
Waterfront Regulation map, Sheet #23,
(b) The exact location and size of the disposal area shall be
ident~fied and staked by the appropriate Authorlty staff
8 EROSION AT REAR OF NOS 19-23 CARMEL COURT, CITY OF NORTH YORK
(DON RIVER WATERSHED)
Res #352 Moved by M W H Biqgar
Seconded by W G Barber
THAT subject to approval of the 1984 .Canada Work Program - Water Resource
Dlvlsion Project an appropriate level of funding be allocated to the
Carmel Court erosion slte in the City of North York,
AND FURTHER THAT the City of North York be so advised
CARRIED
9 SALE OF SURPLUS AUTHORITY-OWNED LAND, TOWN OF VAUGHAN
Res #353 Moved by Mrs L Hancey
Seconded by E V Kolb
WHEREAS The Metropolitan Toronto and Region Conservation Authority is in
receipt of an offer from George, Daniel, and Rlchard Sant to purchase a
parcel of surplus Authority-owned land,
AND WHEREAS it is the opinion of the Authority that it is in the best
interest of the Authority, in furthering its obJects as set out in
Section 20 of the COnservatlon Authorities Act, to accept the offer at
hand,
THAT the Authority request approval of the Minister of Natural Resources
to complete a sale of 53 2 acres, more or less, of surplus Authority-
owned land, being part of Lot 32, Concession X, Town of Vaughan, to
George, Daniel, and Richard Sant, at a sale prlce of 5210,000 00
-7- B-480
THAT said sale be subject to an Order-in-Council being issued in accord-
ance with Section 21(c) of the Conservation Authorities Act, R S o. 1980
AND FURTHER THAT upon receipt of all approvals, the appropriate Authority
officials be authorized to take whatever action may be required to com-
plete the transaction, including the execution of any documents
CARRIED
10 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT
-Property Doverhold Investments Limited
East side Livingston Road, south of Sylvan Avenue,
City of Scarborough
Res #354 Moved by Mrs L. Hancey
Seconded by M W H Biggar
THAT the report (December 16, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopt~d, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
Re Project Land Acquisition Project 1982-1984 - Lake
OntarlO Waterfront Component Scarborough
Sector
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property East of Livingston Road, south of
Sylvan Avenue
Owner Doverhold Investments Limited
Area to be acquired 0 630 acres, more or less
Recommended purchase price Nominal conslderation of 52 00, plus
vendor's legal and survey costs
"Included in the requirements for the above-noted proJect is an irregularly-
shaped parcel of land, being a partial taking from a larger, multi-residential
property, frontingon the east side of Livingston Road, south of Sylvan Avenue
"Negotlations have been conducted with the owner and its sol~citor,
Mr H J Cheeseman of the legal firm Lang, Michener, and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price, as follows
The purchase price is to be the nominal consideration of $2 00,
plus vendor's legal and survey costs, with date of completing
the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses lncurred inc~dental to the closing for land transfer tax, legal costs
and disbursements, are to be pa~d The Authority is to receive conveyance of
the land required free from encumbrance
"The Adm~nistrator of the Water Resource Divis~on has reviewed this proposed
acquisltion, and is in concurrence with my recommendation
"An application has been made to the Minlstry of Natural Resources for an
Inspection Certificate
"Th~s property lS being conveyed to the Authorlty in connectlon with certain
erosion control works belng carr led out along the Scarborough Bluffs "
B-48l -8-
11 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT
-Property Her Majesty the Queen in Right of Ontario
Southerly limit of Lesll.e Street, City of Toronto
Res #355 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the report (December 14, 1983) set forth herein, received from the
Manager, Property & Administrative Services, be adopted, and that the
Secretary-Treasurer be authorized and directed to complete the purchase
CARRIED
liRe Project Land Acquisition Project 1982-1984 - Lake
Ontario Waterfront Component Aquatic Park
Sector
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981, and Authority. Resolution #38,
Meeting #3 - May 15, 1981
Subject property Aquatic Park
Owner Her Majesty the Queen in Right of Ontario
Area to be acquired 624 630 acres, more or less
Recommended purchase price $200 00, plus legal and survey costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Parts of Water Lot location CL3845 in Lake
Ontarlo City of Toronto, situate at the southerly extremity of Leslie Street,
in Lake Ontar~o
"Negotiations have been conducted with officials of the Ministry of Natural
Resources and other affected public bodies and, subject to the approval of
your Committee, agreement has been reached with respect to a purchase price,
as follows
The purchase price is to be the sum of 5200 00, plus legal and
survey costs, with date of completing the transaction to be as
soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses l.ncurred incidental to the clos~ng, for land transfer tax, legal
costs and disbursements, are to be paid The Authority ~s to receive
conveyance of the land required free from encumbrance, w~th the exception of
existing service easements
"The Administrator of the Water Resource Divislon has reviewed this proposed
acquisltion and is in concurrence with my recommendation
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate "
12 LAND ACQUISITION PROJECT 1982-1984 LAKE ONTARIO WATERFRONT
-Property Her MaJesty the Queen in Right of Ontario
South of Lakeshore Psychiatric Hospital, vicinity
Klpling Avenue/Lakeshore Boulevard, City of Etobicoke
Res #356 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the report (December 15, 1983 ) set forth herein, received from the
Manager, Property & Administrative Services be adopted and that the
Secretary-Treasurer be authorlzed and directed to complete the purchase
CARRIED
liRe Project Land Acquis~tion Project 1982-1984 - Lake
Ontario Waterfront Component
Colonel Samuel Smlth Area
Authority Executive Resolution #88, Meeting #4 -
April 8, 1981 and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property South of Lakeshore Psychiatric Hospital
Owner Her Majesty the Queen In Right of Ontario
-9- B-482
Area to be acquired 161 557 acres, more or less
Recommended purchase price $200 00, plus legal and survey costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Water Lot location CL3406 in Lake
Ontario, opposite Lots 5 and 6, B F C , City of Etobicoke, situate south of
the Lakeshore Psychiatric Hospital, in the vicinity of Kipling Avenue and
Lakeshore Boulevard
"Negotiations have been conducted with officials of the Ministry of Natural
Resources and other affected public bodies, and, subject to the approval of
your Committee, agreement has been reached with respect to a purchase price,
as follows
The purchase price is to be the sum of $200 00, plus legal and
survey costs, with date of completing the transaction to be as
soon as possible
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the clos~ng, for land transfer tax, leqal
costs and disbursements are to be paid The Authorlty is to receive
conveyance of the land required free from encumbrance with the exception
of existing service easements
"The Administrator of the Watgr Resource Dlvision has reviewed this proposed
acquisition, and is in concurrence with my recommendation
"An application has been made to the Ministry of Natur al Resources for an
Inspection Certlficate "
13 USE OF VEHICLES ON AUTHORITY LANDS
-Operatlng Directive
Res #357 Moved by W G Barber
Seconded by H C Lawrie
THAT the "Operating Directive for. the Use of Vehicles and Equi pmen t on
Authorl ty Owned Lands", as appended as Schedule "C" of these Minutes, be
adopted for the operation of all vehicles and equipment on M T R C.A lands
whlch have been developed and opened for public use, and wh~ch are managed by
the Authority
CARRIED
14 COLD CREEK CONSERVATION AREA
-Operatlon
Res #358 Moved by M W H Biggar
Seconded by E V Kolb
THAT the shooting ranges at the Cold Creek Conservation Area cease operation
on week-ends and holidays at 5 00 p m
CARRIED
15 REPORT #2/83 - ETOBICOKE-MIMICO ADVISORY BOARD
Res #359 Moved by S A Macpherson
Seconded by J S Scott
THAT Report #2/83 of the Etoblcoke-Mim~co Advlsory Board, as amended, be
received,
AND FURTHER THAT Recommendations #1, #2, #3, #4, and #5, as set forth herein,
be approved
#1 That the City of Mississauga, in its current preparation of a
comprehensive Plan for the Provision of Open Space and Recreation
Facil~ties for the municipality be requested to give consideration
to establ~shing the necessary links w~th existing and proposed
Etobicoke and Metropolitan facilities in the Etobicoke Creek toward
the implementat~on of the Linear Park Plan, particularly in the
Sherway area between the Cities of Etobicoke and Mississauga
B-483 -10-
#2 That the Authority be advised that the report entitled
"Toronto Area Watershed Management Strategy Study (TAWMS) - Results
of the 1981 Progress Report" , and reports of this kind in which no
recommendations are included, are not sent forward, but are presented
to the Executive Committee for information
..
#3 That the staff ascertain whether or not there will be adequate
monitoring of the Mimico Creek, and if it appears that there would
not be adequate monitoring of pollutants and other elements of
water quality, the staff prepare a plan for it to be done
#4 That the Authority obtain, in wri Ung , from the boating clubs at
Humber Bay, an undertaking concerning future public access to club .
property,
And Further That consultation take place (Authority-Metropolitan
Toronto-Etobicoke) prior to preparation of lease agreements so that
public participation will be ensured
#5 That the bank stabilization program of lands on the west side of
the Etobicoke Creek between the Queensway and the Sherway Drive
bridge, identified as the highest prlorlty by the Etobicoke-Mimico
Advisory Board at its meeting held June 3, 1983, be referred to
staff for technical evaluation,
And Further That the area concerned be included on the priority list
now in process of being compiled
CARRIED
16 NEW BUSINESS
Mr Scott lnformed the members of the recent death of Mr Cl-are Balsdon, former
.. Authority member and Township of Pickering Councillor
17 TERMINATION
On motion, the meeting was terminated at 12 20 p m , January ll, 1984
Florence E Gell W E Jones
Chalrman Secretary-Treasurer
KC
B-484
SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
,
"PROJECT FOR THE DREDGING OF THE KEATING CHANNEL
DON RIVER, 1984 - 1985"
DECEMBER, 19A3
B-485 -2-
CONTENTS
-
I PURPOSE OF THE PROJECT
II LOCATION AND DESCRIPTION
III COSTS AND FINANCING
. IV AGREEMENTS
-3- B-486
PURPOSE
-
The purpose of this project is to permit the Metropolitan Toronto and
Region Conservation Authority to exercise the powers afforded by the
Conservation Authorities Act R S 0 1970, Chap 78 as amended to
establish and unqertake in the area over which it has jurisdiction, a
program designed to further the conservation, restoration, development
and management of natural resources in accordance with the Flood Control
Program of the Watershed Plan
The purpose, of this project is to meet one of the defined objectives
of the Flood Control Program which is
to provide in defined flood damage centres, on a
priority basis, protection that will reduce the
risk of flooding to less than 50% over the life
(100 years) of the affected structure(s)
Protection to a higher level will be provided if
economically and/or socially justified
Through this project, the Metropolitan Toronto and Region Conservation
Authority will provide part of the funding for the first two years
of a six year project required to dredge the Keating Channel at the
mouth of the Don River The dredg ing is required to mil'limize the
potential flood hazard, reduce pollution of the Inner Harbour; and
~ai~tain the northeast corner of the harbour for shipping This project
will be undertaken in accordance with the requirements of the
Snvironrnental assessment Act
-
B-487 -4-
LOCATION AND DESCRIPTION
The Keating Channel Environmental Assessment provides a complete
description of the work proposed in this project The following is
a brief description of the principle components of the problem and
the proposed solution
The Keating Channel is the man made mouth of the Don River where it
empties into the northeast corner of Toronto's Inner Harbour Each
year about 50,000 cubic meters (m ) of sediment are deposited by the
Don River into the Keating Channel .Hong wi th the sediment comes
pollutants, which are derived throughout the watershed and adhere to
the fine grained sediment which is deposited in the Channel or carried
out into the Harbour The deposition of this material within the
Keating Channel and the northeast corner of the Inner Harbour makes
these areas virtually unusable for shipping unless regular maintenance
dredging is per formed This same siltation restricts the flow of flood
waters and thus greatly increases the potential for flood ins
particularly as a result of ice jams When dredged, the Keating
Channel acted as an effective sedimentation trap but now sediments flow
into the Harbour and must be removed annually to preserve boat access
to commercial docks
In 1972, Canada and the United States signed a joint agreement to
improve water quality in the Great La ke s system One important result
was a complete ban on the open water dIsposal of polluted dredgeate
Un t il 1974 the Toronto Harbour Commissioners were able to dispose of
the polluted dredgeate in a reasonably economic fashion, the method
used at the time was to bury the material under the advancing fill at
the Outer Harbour Headland However, as a result of the ban on open
water dumping, the dredging was discontinued principally because of the
high cost of any acceptable alternatives for disposal
In 197Q, plans for a confined disposal area at the Outer Harbour
Headland '....ere implemented This facility has been used to a limited
extent for the disposal of material dredged for navigation purposes
since 1981
-5- B-488
Since halting the dredging operations, approximately 400,000 cubic
meters of sediment have collected within the ~eating Channel Area This
- Authority through "The Interim Water and Related Land Management
Project 1979 - 1981 for the Dredging of the Keating Channel, Don River"
supported works undertaken by the Toronto Harbour Commissioners in an
initial dredging project While some dredging was undertaken through
this project, a significant quantity of sediment remains within the
Keating Channel pending the results of the Environmental Assessment
A revised dredging program has been established proposing a six year
effort to complete th~ necessary dredging works This Project outlines
the involvement of the Authority over the fir st two years of the six
year project A subsequent project will be developed to complete the
work following receipt of the final decision on the Environmental
Assessment
The dredging being proposed will be undertaken by crews and equipment
of the Toronto Harbour Commissioners The sediment removed from the
Keating Channel will be placed into botto~ dumping scows and towed to
the disposal facility at the Outer Harbour Headland
It should be noted that following the six year project required to
fully dredge the Keating Channel area, maintena~ce dredging will still
remain a requirement to ensure the fulfillment of the objectives met
through the dredging project
-
B-489 -6-
COST AND FINANCING
The costs associated with this two year project include Legal and
survey fees, land acquisition, engineering and environmental studies,
labour, equipment and material costs associated with the dredging and
material disposal, all costs incurred in relation to the Environmental
Assessment Act approval requirements
COSTS
The cost for the dredging project will be apportioned between, the
Toronto Harbour Commissioners, The Government of Canada and The
Metropolitan Toronto and Region Conservation Authority, with each
agency responsible for one third of the project costs
The cost apportionment allocated to The Metropolitan Toronto and
Region Conservation Authority for its two year project is $350,000
per annum or a to tal cost of $700,000
FINANCING
It is proposed that the fund s required for this project be raised
or. the basis of a 55~ grant from the Province of Ontario and 45%
from the Municipality of Metropolitan Toronto as benefitting
municipality
1984 1985
Province of Ontario $192,500 $192,500
Municipality of Metropolitan $15",500 $157,500
Toronto
TOTAL $350,000 $350,000
-7- 8-490
AGREEMENTS
In undertaking this Project, the Authority will be entering into
a three party agreement where the costs shall be apportioned on
an equal basis The other parties involved being the Toronto
Commissioners and the Federal Government through Transport Canada
.
N
jf
-- LESLIE
STREET
SPIT
TORONTO
TORONTO INNER OUTER
HARBOUR HARBOUR - CEll No,l
- CELL No,2
CEll No 3
.-
0 ~oo 1000
t.= - 1
IolETRE5
, ~ FIG I
~ Ih. I...""""".... ;"''''10.... ......
conservation authontv
GEN:::~':A~;;;:~T s:;:: 11~IR I
- .
.
1
-
-
-- ,
~
.
<.
.
,
, ~....'
.;. , ' ..;
.. "
~ . ,.
;.....'
. ,.
'X \~
, ,:~ \
.- '"' .:.... ~
..
~......-
''I "i.
'\.'.~' _ ..1
J ' ... .
r' Ji.
." , ~ ......,,;:.;. ~ :~
~ , ':(:.; "'" .-
~. ;
..: > ..
<~, ;
.....;....."
v .
.
. -::'
... I
."
. ~I I
.
"
"
, -
, ..
;.;.
.. - ;, .
V". .
. -,....
TORONTO HARBOUR COMMISSIONERS' DERRICK #50 DREDGING KEATING CHANNEL,
DRYDOCK AND OTHER MARINE USES OF THE AREA NOW ABANDONED. JUNE 25, 1965
. --
:T_T~T('~' r'l.""--~
..... ,u'... ~' 1: . .'~,r
,~~,:~.~"".~ .~;',....":'"".. ~-::..^~ .:.o.,.~. ...._,e'~..
: ~-C~~,,:.~""~ r... - '. " ~~.'-
"" ~", - ~- . ~ -' ,-r#> .
.....ttr....~,., ~~ ~~__.' ... : "'JV~ .. ."400___ ~.... ..." -...... 'iI ...."..
~ '''... .. . 7' ..., - - " -if_ l'
. - 'A ./.' ... _ -. .' .~..
."( r":"~)"'.....""""'--'~'" ... ;..""" .. -.. ....._....
~ ~ A'" ~. ....< . . '" ... ,.~_
.. ~ ., ~ \. ~ . ""
, 1........ . ~ - ~ ,'..It' -..., _ ....:).___......-t; . ...,..., -" ~
~ ~~ " ~ ~ _ -. ... .)~"it...., :~~
~,. ,. ~..' ....-.. ..". -, ~ \. '"'
i......~ ~ ,- ....~. ".a. ".~:....p;.; ,.
"1 ' ~ .. · ~,
.. --'**- * ... .... .,...,. ..
..... ,. '. ~ .." ....~r.'.,."
. -t.:I .f:::' r ~ T './{ -
'.... ~.,. ." . ~' ,,' A:' .~'
. -, ~.. .... ~:.. ',L, ,.,."{, . J
r: . '" -.-.. JI/It, ~'" . .~ ';.:J;J.;."::: (....,., ~.....
.,.... t- "-~r'W' '
" .....,.,. _ '~ ,__t'<' _ '1~ 'f:.. ~J.. "'u
. ... ~.,; ~ , ~
l ','\. ,'':I''... ' J '""" '..... 'l....., A.' 'C' ."
~...,,; (, " ~ J...... -'., "I' .... -~, ...1""'''''
~" v,.,~ ~ .,:, ;..~... ....~ ~~ .
. ,....' ." .. - .
~. " '., - . ',' ..~. ~ .
~" ,." ~ ...... "'" .... -~
.. .".. .,........... . ..
... ~...".,..... Ii ·
:, ;~ . ,~'" )',). -
.Jt "1,.,. ~.k1
''''\C' ,.r ~
.~' ,~...: ""'.J:" .,'
~it.~"";'i" '\" ',~ ,.., i
ICE JAM RESULTING IN WATER RISING TO WITHIN 6" OF
TOP OF THE WALL. JANUARY 26, 1978.
B-494
SCHEDULE "B"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
"A PROJECT FOR CHANNEL IMPROVEMENTS
ON THE EAST AND WEST BRANCHES OF
HIGHLAND CREEK"
1qR4-1986
AUGUST, 1983
B-495
CONTENTS
I PURPOSE OF PROJECT
-
. II LOCATION AND DESCRIPTION
III COSTS AND FINANCING
IV AUTHORITY APPROVALS AND REQUESTS
V LAND VAUES
VI AGREEMENTS
VII APPENDIX (i) Technical data sheets, cost benefit analysis
sheets and site plans for the 1984, 1985,
1986 work sites listed below
1984
1 MB 12050
2 MAL 10230
3 MB 11150
4 MB 11050
5 MB 11310
6 MB 11130
, 7 MB 11330
. 8 MB 11550
1985
1 EB 9100
. 2 WB 8400
3 WB 8830
4 WB 8900
5 WB 9270
1986 (See Site Location Map for 1986)
1 EB 10350
EB 1
EB 2
EB 3
EB 4
EB 5
8-496
- 1 -
I PURPOSE OF PROJECT
The purpose of this project is to enable The Metropolitan Toronto and
Region Conservation Authority to continue to carry out channel
improvements on the East Branch of the Highland Creek and further to
extend remedial works to the West Branch between Lawrence Avenue and
the Scarborough Golf Course The project covers a three year period
from 1984-1986
The goal of the Authority through this project is to minimize the
hazards of erosion to life and property on the Highland Creek Watershed
in the Municipality of Metropolitan Toronto and is a continuation of
the work initially undertaken in the "Projects for Channel Improvements
on the East Branch of Highland Creek 1982 and 1983"
To achieve its goal thr Authority has defined the following objectives
( a) to implement a program of site specific remedial works based
on a priority ranking of sites as defined and outlined in the
'Preliminary Engineering Study on Erosion Control, East Branch
- Highland Creek' ,
(b) to recognize the i~portance of the natural valley character in
the design of remedial works wherever feasible
This project will be carried out in accordance with the requirements
of the Environmental Assessment Act and addressed in the 'Class
Environmental Assessment for Erosion and Sediment Control'
B-497
- 2 -
II LOCATION AND DESCRIPTION
Significant erosion has been occurring during both high flow and low
flow periods along the unprotected East Branch of the Highland Creek
and an unprotected section of the West Branch between Lawrence Avenue
and Scarborough Golf Course as illustrated by the shaded ~rea on
Figure 1 The very active erosion which is apparent through these
~ sections is caused by a combination of the fo llowi ng
(i) the marginally stable slopes left as a result of the
major flood s in August of 1976,
(ii) high flow veloc it ies ,
. (iii) the erosion susceptible soils which make up the channel
and valley walls,
(iv) the highly urbanized character of most of the watershed
which leads to increases in peak flows, velocities and
frequency of flooding
The erosion of the stream bank and, in some instances, the valley wall
is having an impact on the terrestrial communities and has resulted
in the loss of large wooded areas The potential also exists for the
activity to eventually subject a significant number of residences to
a potential hazard The existing erosion is affecting municipal
services and existing hydraulic structures located in the floodpl<?in,
and restricts the use of valley land for park purposes as seen in the
attached photographs
In response to concerns expressed by The Metropolitan Toronto and
Region Conservation Authority, the Borough of Scarborough, the
l~e t ro po li tan Toronto Parks and Property Department and Metropolitan
Toronto Works Department, the firm of Cumming-Cockburn and Associates
Limited was authorized by the Conservation Authority to undertake a
study to identify the most serious erosion areas and to develop a
long-term program for mitigating problems associated with erosion along
the study area The reach of Highland Creek to be analyzed for erosion
problems included
West Branch - From Lawrence Avenue upstream 1 km
East Branch - From confluence with West Branch to the
confluence with the Malvern Branch
Malvern Branch - From its confluence with the East Branch
to Highway 401
11a r kh am Branch - From its confluence with the Malvern Branch
to the Scarborough Channel
The consultants have recommended that the most feasible course of action
to solve the erosion problem within the study area would be to carry
out remedial works on a high hazard site specific basis The advantages
for carrying out works in this manner include, maximum benefit for
capital expenditure , expediency in resolving erosion problems and the
capability of focussing the construction activity in the areas of
highest priority first
In order to determine the order of priority for future works, an
inventory of erosion sites was carried out and a weighting system was
developed to rank the sites The weighting system developed, assessed
such parameters as
( i) existing and future potential for lateral movement of the
stream bank,
(ii) proximity of structures to the erosion problem,
(i i i) environmental significance of the area,
(iv) rate of erosion,
(v) soil characteristics of the effected bank,
B-498
PROJECT FOR CHANNEL IMPROVEMENTS
ON THE EAST 8 WEST
BRANCHES OF HIGHLAND CREEK
I
'"
HWY. 401
i 3:
~
(l'i ~
~
C,N.R, /
~~f
~ '""'-.:.../
~
~~
~/ ONfARIO
~r t.AKE
~~
~
/7
111111111111 AREAS OF S1GNIFICA~T EROSION FIG. I
B-499
.
THESE PHOTOS REPRESENT THE TWO HIGH PRIORITY
SITES (ME 12050 & MAL 10230) BEING CONSIDERED
FOR REMEDIAL WORKS UNDER THIS PROJECT.
B-,50(
.
EROSION DAMAGES TO SERVICES IN THE FLOODPLAIN
501
'.
i ~
~\J
"'i
- ~
EROSION ON THE MARKHAM BRANCH OF
THE EAST HIGHLAND CREEK
Notice both the coincident valley wall erosion
which is encroaching into useable tableland
areas and also the extensive riverbank erosion.
-
.
EB9100 puB
I
Ind8ll Key
~ ......... ---
c....~ In -U~I I Ref o'CJC?
II L..... Ont.ftoQ I
W.t_COUfM Abbr-.t--.
.
PLT A Pr_.I't Lt" ""......-
Abbr.VlaItion K.~
....L ...I"...It BrIlftCJl
MB ""kMm Ikand!
MBII550 PH A Edt BrMCtl
EB
WB West Br-.dl
1.1812250 puB puA SI.tMJll,plw:aEft'f..~
' \~~"~.." P\.1 B S4~IIrt)' P'uS ttaz...d
'. "I ,.
I i :.,/
....;- ",
I WB9210P1.TA
"'Iropoli.l_ 'CM~....:I ....- c:c.....qt.. auu.",
I CummIng-Cockburn & Aaaoct.ln Limited
I "" 0 "" A Pr~, l~".., ltuctr oa Erot:lOft Co.-I,ot IOf
I fast Ikaow:tl hogllfMwl Cr.....
ae... tm_ Plan of Erosion Sensitive Areas
Site
I
2 !
f'WW.'
11l
I
l.T
C
l'...
B-5C3
- 8 -
Figure 2 indicates the location of the sites inventoried and identified
in the report
Table I lists in order the top ten sites determined to be the most
serious o~ hazardous of the sites inventoried
As a result of the number of sites inventoried, the Authority is
proposing to apportion the remedial works required over a three (3)
year period The proposed remedial works for the most part will be
carried out on a priority basis established by the consultants However
in order to minimize the disturbance and the environmental effects of
the construction to the areas and further to maximize the use of our
access roads and work yards, some of the lesser ranking sites will be
worked on during the same time as the high priority sites if they
are in the same area
Erosion protection remedial works for the priority sites where
structures are affected must be tailored to suit the particular
conditions at each location To stabilize these areas, alternative forms
of protection and materials were evaluated in order to select the most
appropriate and economically viable solution The preliminary designs
developed by the consultants will be fine tuned by Authority staff
for implementation in the field
A standard design approach has been developed where previous development
or structures are not as yet affected but where significant amount of
erosion is still occurring An example of a typical design solution
for this type of problem is shown in Figure 3, while following is a
description of this -solution
(i) Regrading of affected bank to a minimum 2 1 slope,
(ii) Placement of a 400 mm thick well graded granular base (or
and equivalent filter cloth),
(iii) Placement of an average 450-550 mm layer of rip rap
protection,
(iv) Placement of rip rap protection to a minimum height of
two metres above the existing invert This would provide
complete toe protection for the annual runoff event
(v) Extend rip rap protection upstream to where the existing
channel is stable If the rip rap cannot be tied into a
stable section, a rock cut-off wall should be constructed
Attached in the appendices are location plans, technical data sheets
and cost/benefit analysis sheets for all of the sites being considered
for remedial works under this project Following is the proposed work
program for the 3 year project, which lists the site and the projected
work year
TYPICAL CHANNEL SECTION
3 /REVEGr:TATE WITH SHRUBS e. TREES
-------.J' /100 YR FLOOD ELEVATION
EXISTING PROFILE
250mm - 600mm RIP RAP
"
\J
~
I I CLEAN OUT
GRANULAR A BACKFIL L
270R TERRAFIX FILTER
FIG. 3 tJ:I
I
U1
B-50S - 10 -
PROPOSED WORK PROGRAM
- FOR HIGHLAND CREEK
1984
1 MB 12050 HIGHLAND CR~EK I/R4
2 MAL 102'lO
3 MB 111 <;0
4 MB 11050
5 MB 11310 HIGHLAND CREEK II/R4
6 MB 11 no
7 MB 1 n30
fl MB 11550
19R5
1 EB 9100
2 WB R400
'1 WB RR'~O
4 WB SJ900
5 WB 9270
1qRfi (See Site Location Map for 19R6)
1 EB 10150
EB 1
EB 2
EB 3
EB u
EB 5
B-506
- 11 -
TABLE I
SUMMARY OF HIGH PRIORITY SITES
PRIORITY SITE (STATION)
1 MAL 10230
2 MB 12050
3 WB 8830
4 MB 12300
5 MB 11310
6 WB 9270
7 EB 8500
g liB 3900
9 EB 8870
10 MB 11550
NOTE Refer to Figure 2 for location of High Priority Sites
B-507
- 12 -
III COSTS AND FINANCING
The expenditures required to implement this project are based on the
. best information currently available for works to be undertaken The
costs stated shall be understood to include legal and survey fees,
engineering and geotechnical studies, site supervision and all
materials, labour, equipment, etc associated with the construction
The proposed allocation of funding for these works on an annual basis
is as follows
COSTS
YEAR 1984 1985 1986
TOTAL $540,000 $350,000 $350,000
FINANCING
The total cost of the three year project is $1,240,000 and the yearly
costs will be funded as follows
1984 Authority - $243,000
Province of Ontario - $297,000
Total Annual Cost $540,000
1985 Authority - $157,500
Province of Ontario - $192,500
Total Annual Cost $350,000
1986 Authority - $157,500
Province of Ontartio - $192,500
Total Annual Cost $350,000
The Municipality of Metropolitan Toronto is designated as the benefiting
municipality to raise the Authority's share of the work
B-508
- 13 -
IV AUTHORITY APPROVALS AND REQUESTS
Authority Motion
Letter to Metro
Metro's Approval
Letter to Minister
'=-509
SCHEDULE "C"
OPERATING DIRECTIVE FOR THE USE
OF VEHICLES AND EQUIPMENT ON AUTHORITY OWNED LANDS
1 In this directive, "vehicles" refers to any self-powered unit,
automobile, truck, tractor, riding mower, etc
2 In this directive, "Conservation Areas" refers to all or any Authority
owned lands which have been developed for public access and are
managed by the Authority
3 That every effort be made to minimize the number of vehicles generally
used in servicing Conservation Areas.
4 That every vehicle travelling in or through a park, and not on a park
roadway, be required to use its 4-way flashing lights, and that a
decal be posted within the vehicle advising employees of this policy
5 That no vehicle shall be permitted to exceed a speed of 20 km/hr while
driving or operating in a Conservation Area unless otherwise posted
6 That the posted speed limi~ of 30 km/hr on a park roadway be adhered
to
7 That whenever possible, the vehicle is to be parked in such a manner
that it can be driven away in a forward direction
B That any vehicle requiring to back up in a park shall be directed by
a second employee who shall locate himself in clear view behind the
vehicle Should an operator be alone, then he shall back up only
after circling the vehicle
9 That every attempt be made to schedule the use of vehicles in parks
to periods when the park is not heavily used
10 That nothing be stored on the dash of Authority vehicles (paper, tools,
lunch buckets, etc ) that may reduce the visibility of the operator
11 That these directives apply to all Authority Divisions and outside
agencies, and that all agencies be notified of these directives with
a req~est that their operators be so informed and that they attempt
to minimize their travel in Conservation Areas
12 That the posted decal referred to in Item 4 is not required for
outside agencies
l3 That obstacles which may block the view of small children adjacent to
service areas, and park access routes, be relocated a minimum of
three (3) meters distance from the vehicle route
l4 That future Conservation Area design plans attempt to provide service
access to park facilities that do not conflict with high use public
areas
15 That the operator or driver of any vehicle or equipment remove the
key when he leaves the unit, and that if a vehicle is to be left
unattended, that it be locked
16 That every employee who may be required to operate a vehicle or
equipment in a park be made aware of these directives
1984 01 04
~ B-5l0
,
the metropolitan toronto and region conservation authority
minutes
EXECUTIVE COMMITTEE 16-JANUARY-1984 REPORT #23/83
(SPECIAL MEETING)
A Special Meeting of the Executive Committee was held at the Authority Office,
5 Shoreham, Downsview, on Monday, 16 January, 1984, commencing at 10 00 a m
PRESENT
Chairman Mrs F E Gell
Vice-Chairman E V Kolb
Members W G Barber
M Ii H Biggar
(Fo~ Ms S Nimmo) J A Bryson
E A Fulton
Mrs L Hancey
H C Lawrie
S A Macpherson
Mrs N Stoner
ABSENT
Members Ms S Nimmo
J S Scott
At Meeting #22/83 of the Executive Committee, held January 11, 1984, it was agreed
that a special meeting of the Comm~ttee would be convened on Monday, January 16 to
dlscuss the report "Metro Toronto and Region Conservation Authority Revlew
(November 1, 1983)"
This being a special meeting, no minutes were presented
It was agreed that the report be re-drafted by the Acting General Manager to
lncorporate changes agreed upon at today's meeting and on file with the
Authority's representat~ves on the Pollcy and Steering Committee, and that the
report be submitted to the Policy and Steering Committee for further conslderation
The meeting was termlnated at 12 45 P m , January 16
Florence Gell W E Jones
Chalrman Secretary-Treasurer
KC
~ B-5ll
V
the metropolitan toronto and region conservation authority
minutes REPORT #24/83
EXECUTIVE COMMITTEE 25-JANUARY-1984 #24/83
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, 25 January, 1984, commenclng at 9 30 a m
PRESENT
Chairman Mrs F E. Gell
Vice-Chairman E V Kolb
Members W G Barber
M W H Biggar
E.A. Fulton
Mrs L Hancey
(For H C Lawrie) 0 Jackson
S A Macpherson
Ms S Nimmo
Mrs N Stoner
Authority Member J A Bryson
Gardiner, Roberts B Casey
ABSENT
Members H C Lawrie
I J S Scott
"lINUTES
Res #360 Moved by W G Barber
Seconded by Mrs N Stoner
THAT the Minutes of Meeting #22/83 be approved,
CARRIED
DECLARATIONS
Mr Barber declared a conflict concerning Item 5 of these Minutes, and did not
part~clpate in dlscussion or vote on the ~tem
SECTION I
FOR CONSIDERATION
1 THE METROPOLITAN TORONTO AND REGION
CONSERVATION FOUNDATION
-Reappointment of Members
Res #361 Moved by Mrs L Hancey
Seconded by Mrs N Stoner
THE EXECUTIVE COMMITTEE RECOMMENDS THAT the following members be re-appointed
to The Metropolitan Toronto and Reg~on Conservation Foundation for further
three-year terms
Mrs J A Gardner - February 21, 1984 - February 21, 1987
Mr D Melnik, Q C - February 21, 1984 - February 21, 1987
Mr MOP Morrison - March 2, 1984 - 'larch 2, 1987
CARR~ED
B-5l2 -2-
SECTION II
FOR INFORMATION
2 MR KENNETH G HIGGS - SEPARATION SETTLEMENT
Res #362 Moved by Mrs N Stoner
Seconded by E V Kolb
THAT the Secretary-Treasurer and Authority Counsel be authorized and
directed to complete a separation settlement with Mr Kenneth G Hig9s on
the basis agreed to as between Authority Counsel and Counsel for Mr Higgs
CARRIED UNANIMOUSLY
3 CORRESPONDENCE
Mr W A McLean, Acting General Manager, reported receipt of the following
correspondence
Letter dated January 18, 1984 to the Chairman from Mrs Nancy Caldwell,
thanking the Authority for flowers sent for her husband's funeral, and
expressing her appreciation to members and staff who attended the memorial
service
4 APPLICATIONS FOR PERMIT UNDER ONTARIO REGULATION 170
Res #363 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the applicatlons listed herein as A (1) to A(5) inclusive, be approved,
subject to the conditions contalned in the reports
CARRIED
An) Donald Hayhoe
To construct off-stream pond, south side Highway #49, west of
Highway #27, Town of Vaughan (Humber River Watershed)
In accordance with the following documents, which shall form part of the
permit
A Pond and Site Development Study Plan submitted wlth the
appllcation
A(2) Town of Vaughan
To place fill within regulated area, Lot 28, Concession III
Town of Vaughan (Don River Watershed)
In accordance with the followlng documents and plans, which shall form part
of the permit
Drawlng #2, West Don Soccer Field, as prepared by the
Town of Vaughan Parks & Recreatlon Department
A(3) Markham Congregation of Jehovah's Witnesses
To construct building and associated parklng facilities,
south of Highway #7, east side McCowan Road, Town of Markham
(Rouge River Watershed)
In accordance with the follow~ng documents and plans, which shall form
part of the permit
All works being completed in accordance with the site plan, Sheet #1,
as drawn by T Luff, certified by D Petrie, P Eng , and dated
August 12, 1983 (Revislon Oct 11, 1983 )
-3- B-513
A(4) Town of Markham
To construct two channels and two detention ponds in two branches
of the Morningside Tributary of the Rouge River, Lots 1 and 3,
Concession VIII
In accordance with the following documents and plans, which shall form
part of the permit
..
(a) Project #82021, Drawings Ll, L2, and Cl to C12 inclusive, by
Andrew Brodie Associates Inc , and dated October and November, 1983,
(b) The report entitled "Town of Markham Armadale Community (Area lA)
Design of Stormwater Detention Ponds, Channels and Trunk Storm
Sewers Of , dated November 11, 1983, by Andrew Brodie As~ociates Inc
(c) Notes and calculations for the South Pond Inlet Structure by .
Andrew Brodie Associates Inc
A (5) Reddington Properties Management Ltd
~o lnstall, 74" x 50 " corrugated steel culvert in the Centreville
Creek, East Half Lot 3, Concession III, Town of Caledon
Humber River Watershed)
In accordance w~th the following documents and plans, which shall form
part of the permit
(a) All work shall be undertaken and completed in accordance with
Contract Drawing #2 (the original, as prepared by Paul Theil
Associates) , and modified by Patrlck Falby & Associates in
June. 1982,
(b) Sil~~tlon traps shall be installed and kept in good condition
and in place until all construction has been completed as it
relates1to the creek crossing . .
5 HUMBER RIVER CHANNEL IMPROVEMENTS CONTRACT - PHASE II
-Extra Work Orders Nos 4, 5 , and 6
Res =F364 ;'loved by Mrs N Stoner
Seconded by '.'I G Barber
THAT Extra Work Orders :-los <: , 5, and 6 to the contract for the Humber River
Channel Improvements Contract ?hase II in the former Village of Bolton, in
the amounts of 52,425 75, $936 60, and 5945 00 respectively be approved,
AND FURTHER THAT the approval of the Min~stry of Natural Resources be
requested
C.l\RRIED
6 CLAIREVILLE DAM
-Replacement of Sumo Pumps
Res #365 Moved by 14rs N Stoner
Seconded by W G Barber
~HAT the firm of T V S ?umps be retained to replace the sump pump system at
the Clairevllle Reservolr at a cost not to exceed $2,224 00
CARRIED
7 LAND ACQUISITION ~ROJECT 1982-1984 ROUGE RIVER WATERSHED
-Property The Mun~clpality of Metropolitan Toronto
VlClnlty of 'leadowvale Road, north of Sheppard Avenue,
Clty of Scarborough
Res #366 Moved by W G Barber
Seconded by Mrs N Stoner
THAT the report (January 16, 1984) set forth hereln, received from the
Manager Property & Adminls~ratlve Services, be adopted, and that the
Secretary-Treasurer be authorized and directed ~o complete the purchase
CARRIED
B-514 -4-
Re Project Land Acqu~sition Project 1982-1984 - Flood
Plain & Conservation Land Component Rouge
River Watershed
Authority Executlve Resolution #88, Meeting #4 _
April 8, 1981, and Authority Resolution #38,
Meeting #3 - May 15, 1981
Subject property Vicinity of Meadowvale Road, north of
Sheppard Avenue
Owner The Municipality of Metropoli tan Toronto
Area to be acquired 9 435 acres, more or less
Recommended purchase price Nominal consideration of $2 00, plus
vendor's legal and survey costs
"Included In the requirements for the above-noted project are several small
parcels of land, being composed of Parts of Lots 4 and 5, Concession III, and
Parts of Road Allowance between Lots 4 and 5, Concession III, City of
Scarborough (The Municipality of Metropolltan Toronto), said land situate
in the vicinity of Meadowvale Road, north of Sheppard Avenue
"Negotiations have been conducted wlth officials of The Municipal~ty of
Metropolitan Toronto and, subject to the approval of your Comm~ttee, agreement
has been reached with respect to a purchase price, as follows
The purchase price is to be the nominal consideration of $2 00,
plus vendor's legal and survey costs with date of completing
the transaction to be as soon as possible
"I recommend approval of this purchase, and that the legal firm of
Gardiner, Roberts be instructed to complete the purchase All reasonable
expenses incurred incidental to the closing for land transfer tax, legal costs
and disbursements are to be paid The Authority lS to receive conveyance of
the land required free from e~cumbrance, with the exception of existing
service easements
"The Admlnistrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation
An applicatlon has been made to the Mlnistry of Natural Resources for an
Inspection Certificate "
8 ALBION HILLS CONSERVATION FIELD CENTRE
-Quotation #I&E2/84 Kitchen Renovations
Res #367 Moved by Mrs N Stoner
Seconded by D Jackson
THAT subject to obtaining the approval of the Board of Education for the
City of Etobicoke, the contract for renovatlons of the kitchen at the
Albion Hills Conservation F~eld Centre be awarded to Falrwin Constructlon
Company Limited, in the amount of $58,750 00, it being the lowest quotation
received
AND FURTHER THAT the staff be author~zed to make any deletions required to
keep within budget
CARRIED
9 ALBION HILLS CONSERVATION FIELD CENTRE
-Quotation #I&E3/84 Kltchen Equipment
Res #368 Moved by Mrs N Stoner
Seconded by M W H Biggar
THAT subject to obtainlng the approval of the Board of Education for the
City of Etobicoke the contract for the supply of Food Servlce equipment
for the Albion Hills Conservatlon Fleld Centre be awarded to Artlstlc
Restaurant Equipment Limited, in the amount of $20 l4l 00, it belng the
lowest quotatlon recelved
AND FURTHER THAT the staff be authorized to make any deletions required to
keep within budget
CARRIED
-5- B-51S
10 ACCOUNTS FOR THE PERIOD DECEMBER 4-31, 1983
Res #369 Moved by M W H Biggar
Seconded by D Jackson
THAT accounts, aggregating $2,812,816 00, for the period December 4, 1983 to
December 31, 1983, be approved for payment (~ists of accounts on file in
the Accounting Section)
4 4 CARRIED
11 STAFF FINANCIAL PROGRESS REPORT
-October l/December 31, 1983
,
Res #370 Moved by E.A Fulton
Seconded by . Mrs N. Stoner .
THAT the Chairman be requested to contact the Minister of the Environment
to determine the status of the Authority's application for exemption under
the Environmental Assessment Act for the Shoreline Management Project on
South Marlne Drive
CARRIED
Res #371 Moved by S A Macpherson
Seconded by E A Fulton
THAT the Staff Financial Progress Report for the period October 1 to
December 31, 1983, as appended as Schedule "A" of these Minutes be received
CARRIED
12 REPORT #4/8: OF THE MARKETING PLAN SUB-COMMITTEE
Res #372 Moved by D Jackson
Seconded by M W H' Biggar
.I
THAT Report #4/83 of the Marketing Plan Sub-Committee be recel~ed,
AND fURTHER THAT the following action be taken
(al The Report "1984 Marketing Plan" be received as revised,
(bl The recommendations regarding marketlng, adopted by the Executive
Committee In May, 1983 be affirmed,
(c) The "Product Improvement Requirements" (Table 1) beyond 1984 be
recommended to the appropriate advisory commlttee for reVlew and
recommendatlon
(d) The items identifled on Table 3 be included in the 1984 Budget
(e) Staff be directed to prepare, during 1984, a lO-year Concept Plan
for Publlc Use Facillties complementary to the work currently
belng undertaken by Metropolltan ~oronto,
(f) Staff identify the costs involved in establishing a higher level
of facility maintenance and, where appropriate, staffing to ensure
vlsitor satlsfaction,
(q) The "1984" Programs and Events" (Table 2) be approved and
lmplemented
(h) The concept of prlcil'1g packages, including the proposed "Super Pass"
be approved, in principle, subJect to a comprehensive pricing
schedule being provlded for cons~deration by the Executive Committee,
(i) The concept of "theming" of Conservation Areas be approved,
(j) During 1984, the summer hours at the Kortright Centre for Conservation
be extended,
(f-) During 1984, the hours, days, and months of operating at all
facilities be revlewed to ensure that operations are cost-
effective
B-516 -6-
(1) Staff be directed to develop the necessary lists to initiate or
improve the distribution of promotional material to specific
target groups,
(m) The Staff Comm~ttee on Marketing be continued and that the
Acting General Manager be named Chairman
CARRIED
OTHER BUSINESS
13 REPORT OF EXECUTIVE MEETING #23/83(SPECIAL)
Res #373 Moved by W G Barber
Seconded by E A Ful ton
THAT Report #23/83 of the Executive Committee be received
CARRIED
Res #374 Moved by Mrs L Hancey
Seconded by M W H Biggar
THAT the Chairman be requested to contact the other members of the Policy
Steering Committee on the Review of the Organizatlon and Mandate of the
M T R C A , and request their approval for the draft report and Executive
recommendations to be made available to the members of the Authority at
its Annual Meeting on February 17, 1984
CARRIED
14 Res #375 Moved by E V Kolb
Seconded by W G Barber
THAT Mr Scott Macpherson be thanked for his contribution to the Authority
over the past seven years, and that the good wishes of the members be
extended to him in his future endeavours
CARRIED
Mr Macpherson expressed appreclatlon of his association with the
Authority and the Executive Committee, and especially for the leadership
of Mrs Gell as Chairman
15 TERMINATION
On motion, the meetlng was terminated at 11 55 am, January 25, 1984
Florence E Ge11 W E Jones
Chairman Secretary-Treasurer
KC
B-5l7
SCHEDULE "A. II
STAFF PROGRESS REPORT
Prooe'l:ty and Administration Section
. .
During the period October 1, 1983 to December 31:, 1983, the staff
completed the acquistion of 22 new properties containing 29 468 acres The
tota 1 acreage of lands owned by the Authority, as of December 31,1983 is
27,876 147
. .
SUMMARY of 1983 ACTIVITIES of the PROPERTY and ADMINIST~ATION SECTION
of the EINANCE and ADMINISTRATION DIVISION
- completion of 79 property transactions containing a total of 430 796
acres. Activities under this category mainly related to the acquisition of
property rights necessary to facilitate Authority Flood Control
construction in the Humber River Watershed at Bolton and Palgrave; Erosion
Control Works in the vicinities of Humbe~vale Boulev?rd, Beaucourt Road
and Delroy Drive in the Mimico Creek watershed; and Azalea Court in the
Humber River Watershed; as well as Shoreline Management construction along
Lake Ontario in the areas of Fallingbrook Drive and Lakehurst Crescent
Flood plain, valley and lakefront properties were also acquired at various
locations under the Land Acquisition 82-84 and Lake Ontario Waterfront
Projects
- management, 3dministration and 9rocessing of assessment, real ty tax and
insur3nce matters pertaining to 1,943 Authority-owned properties,
Authority buildings and equipment, including preparation of appeals and
negotiation and completion of settlements
.
- carrying out management and administration involved in all property
arrangements pertaining to Au tho r Lty-owned lands including
- 147 Rental Arrangements involving residences, farmlands, apairy sites
and other uses compatible wi th the objectives of the Authority
- licences, leases and management agreements with Municipalities and other
public bodies.
- sales and conveyance of easement rights for roads, sewers and other
publ.c purposes
- the Deed plot mapping of all Autho~ity-owned prol?erties, commenced in
early 1983 with assisstance from the C 0 E 0 Program, is now complete for
all watersheds except the Humber It is antlcipated that this i?roject
,..ill be fully coml?leted during 1984
- i?roperty files and records on older matters were consolidated and
re-aligned A pilot i?roJect of Microfilming property records which must
be retained on a permanent basis is underway
- the section also carried out all administration and support services in
connection with the maintenance of the Mministration Headquarters,
pri~ting, mailing, office equipment and supplies Streamlining of
services in the print and mail room and upgrading of the interior of the
administration building were carried out during 1983
A breakdown of the properties and acreages acquired by the Authority to date
is as follows
B-518
- 2 -
ETOBICOKE CREEK WATERSHED
Flood Control and Water Conservation
Total to date-- 67 properties acquired containing 451 734 acres;
Conservation Area
Total to date--IO properties acquired containing 418 170 acres;
Total of Watershed 77 properties acquired containing 869 904 acres
MIM1CO CREEK WATERSHED
.
Flood Cont.rol and Water Conservation
- 9 properties settled during period containing 2 586 acres;
- 9 purchases
Mimico Creek Flood Plain Lands
- D M Egles Property,
- Estate of F Richardson Property,
- E and A Riss Property ,
- F and F Degg Property,
- J and L Borland Property,
- M Snyder Property,
- N Martin Property,
- J Barr Property,
all located at the rear of numbers 12-30 Beaucourt Road,
City of Etobicoke
- Ontario Hydro Property, located south of Bloor Street, west of
Royal York Road, in the City of Etobicoke
Total to date--58 properties acquired containing 94 542 acres;
- 2 expropriations outstanding (permanent easement)
Total Watershed 58 properties acquired containing 94 542 acres
HUMBER RIVER WATERSHED
Flood Control and Water Conservation
- 3 properties settled during period containing 5 168 acres;
- 3 purchases
- Humber River Flood Plain Lands
- Town of Vaughan Property, located on the south side of Highway #7, west
of Kipling avenue, Town of Vaughan
- Town of Caledon Property, located between Humber Lea Road and Queen
Street, in the Bolton area, Town of Caledon
- Finery Investments Limited Property, located west of Indian Line, north
of Darcel Avenue, (Finch Avenue Extension) in the Claireville Area, City
of Mississa'uga
-1 property sale during period comprising 0 146 acres;
- Sale to the City of Etobicoke for construction of a sidewalk
(0 146) acres
3-519
- 3 -
HUMBER RIVER WATERSHED cont'd
Claireville Dam and a<:ser'loir Lands
- 1 property sale during period co~prising 9 110 acres; -
- Sale to the Ministry of Government Services for re-construction of
.. Highway *50 north of Steeles Avenue
Total to date--804 properties acquired containing 8,579 213 acres;
Conservation Areas
Total to date--79 properties acquired containing 4,305 773 acres;
E'orest and Wildlife Areas
Total to dat~--10 properties acquired containing 736 486 acres;
Agreement Forest Lands
Total to date--23 properties acquired containing 1,365.745 acres;
;Hagara Escarpment Lands
Total to date--4 properties acquired containing 251 926 acres;
Total of Watershed 920 pro1?erties acquired containing 15,789 143 acre~
DON RIVER WATERSHED
Flood Contrdl and Water Conservation
Total to date--19l ~roperties acquired contiining 1,955.137 acres
- 4 ex!,ropriations outstanding (1 permanent easement)
Conser'"ation Area
Total ~o data--l property acquired contai,ing 9 350 acres;
Tota!. of Natershed 192 properties acquired containir.g 1,964 487 acres
HIGHLAND CREEK WATSRSHED
Flood Control and Water Conservation
.
- 2 properties settled during period containing 3 267 acres;
- 2 purchases
Highland Creek Flood Plain Lands
- City of Scarborough Property, located south of Sheppard Avenue East, west
of Lapsley Road, City of Scarborough
- M Miller Property, located on the south side of Lawrence Avenue, 'Nest of
Centennial Road, City of Scarborough
- 1 ?roperty sale during period comprising 2 648 acres;
- Sale to the City of Scarborough for road construction purposes (2 648
acres) ;
Total to date--145 properties acquired containing 824 530 acres;
8-520
- 4 -
HIGHLAND CREEK WATERSHED cont'd
Conservation Area
Total to date--2 properties acquired containing 118 626 acres;
Total of Watershed 147 properties acquired containing 943 156 acres
ROUGE RIVER WATERSHED
Flood Control and Water Conservation
- 1 property settled during period containing 9 435 acres;
- 1 purchase
- Rouge River Flood Plain Lands
- Municipality of Metropolitan Toronto Property, located on the east and
west sides of Kirkham's Road, between Sheppard Avenue and Finch Avenue,
City of Scarborough
Total to date--122 properties acquired containing 2,098 774 acres;
Conservation Area
Total to date--2 properties acquired containing 267 038 acres;
Total of Watershed 124 properties acquired containing 2,365 812 acres
DUFFIN'S CREEK WATERSHED
Flood Control and Water Conservation
Total to date--90 properties acquired containing 905 423 acres;
Conservation Area
Total to date--19 properties acquired containing 1,076 568 acres;
Forest and Wildlife Area
Total to date--16 properties acquired containing 1,749 696 acres;
Agreement Forest Lands
Total to date--l property acquired containing 93 000 acres;
Total of Watershed 126 properties acquired containing 3,824 687 acres
PETTICOAT CREEK WATERSHED
Flood Control and Water Conservation
Total to date--l oroperty acquired containing 22 139 acres;
B-521
- 5 -
PETTICOAT CREEK WATERSHED cont'd
Conservation Area
Total to date--l property acquired containing 177 918 acres;
- -
- Total of Watershed 2 properties acquired containing 200 057 acres
LAKE ONTARIO WATERFRONT
Waterfront P!an
- 7 properties settled during period containing 9 012 acres;
- 7 purchases;
-Pickering/Ajax Sector
- Corporation of Town of Ajax Property, being Cherry Road, located west of
Shoal Point Road in the Pickering Beach area, Town of Ajax
- Scarborouqh Sector
- Doverhold Invest~ents Li~ited Property, ~ocated on the east side of
Livingston Road, south of Sylvan Avenue, City of Scarborough.
- I Bayley Property
- W Renwick Property
- G w: McKague ?roperty
- F S. Duckworth Property
- ~ L Morris Property, all located south of Fallingbrook Drive, in the
. general vicinity 9f Victoria Park Avenue and Queen Street East,
City of Scarborough.
Total to date--2S8 properties acquired containing 1;774 929 acres
Conservation Area
Total to date--9 9roperties acquired containing 49 430 acres;
Total of Lake Ontario Waterfront
297 properties acquired containing 1,824 359 acres
.
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
October 1 - December 31, 1983 - 15 properties settled containing 20 456
acres; (-15 purchases;)
- 3 property sales
Total to date--l,478 properties acquired containing 14,931 492 acres;
- 5 expropriations outscanding
-
B-522
- 6 -
Summary cont'd
CONSERVATION AREA
October 1 - December 31, 1983
Total to date--123 properties acquired containing 6,422 873 acres
FOREST AND WILDLIFE AREAS
October 1 - December 31, 1983
Total to date--26 properties acquired containing 2,536 182 acres
AGREEMENT FOREST LANDS
October 1 - December 31, 1983
Total to date--24 properties acquire~ containing 1,958 745 acres
NIAGARA ESCARPMENT
October 1 - December 31, 1983
Total to date--4 properties acquired containing 251 926 acres
WATERFRONT PLAN
October 1 - December 31.1983 - 7 properties settled containing 9 012 acres;
(- 7 purchases)
Total to date--288 properties acquired containing 1,774 929 acres
GRAND TOTAL OF ALL PROJECTS
October 1 - December 31, 1983 - 22 r;>roperties settled containing 29 468
acres (- 22 purchases)
- 3 property sales
Total to date--l,943 properties acquired containing 27,876 147 acres;
(11,281 477 hectares)
- 6 expropriations outstanding
1984 01 12
DO/am
6-523
TO THE CHAIRMA~ AND MEMBERS OF THE EXECJTIVE COMMITTEE,
M T R C A - Mtg 111/84
FRO"! 11R J C MATHER, ~DMINISTRATOR - ~ATER RESOURCE DIVISION
RE WATER RESOURCE DIVISION PROGRESS REPORT
OCTOBER 1, 1983 TO DECEMBER 31, 1983
The attached progress report is presenced for the periOd October 1 ,
1983 to December 31, 1Q8'3 The report details both the physical and
financial progress of the various programs and projects in the Flood
Control and the Wacerfront Sections Uso included is a status report
on the Fill Violations as prepared by the Development Control Section
Attachments
1994 01 16 ,
JCM/ fs
.
-
to
IJi"l.I<I.,lliiG 5T,\TEI'lt::N r PAGE 1 I
Ul
BY PIWGllMI "t.ld;'l.' eNDING 8.31<..31 REP 109 N
",.
E XP[I~O r T U fl F S REV E N U E
.. - --'" -~. --- .~~..- --~- .~_.- "- .... . '_"_ _ ..._'_____ _ . _ __.___4__ ;:;:. =-=:":'::::1:=:::: = :.~=:::: c:==; = === ::== == = =.;.:1== ='=-=::::::.:= = =
---.--------..--.. ...-."---- .-- -_.----------_.----- ---------
li-T-D ')-T 0 :~ FUtWS /'I-T-O Y-T-D /.
BUDCET ACTlIliL I\CTUAL EXP AVAILABLE BUlJGET ACTUAL ACTUAL RECD
--.-- -- --------- - - - -- --- - -------.-- ---.--.. ------ ------- ----
------ ------ --.---- --------- ------ ------ -------
WATER IlESOlJl,' E - 1'1 nOD CIlNi/WL
~==~~==-~===~~--~~~~=~~~~~=~==~
ADi'll NI STRATI ml FLnUIJ cnNTRUL 7LJ3,652 ,'>I, Ul1 /-'0, 5 ~')8 103 6 26 906- 743,652 16,288- 2 2
METRO - EIWS ION CONTROL 396,500 101,354 381, 131 96 1 15,369 396, 500 3,400- 39,422- 9 9
YOfm - EHOSIW4 \,OI'UiWL 23, 500 10,375 44 2 13, 125 23, 500 1,400- 6 0
"
PEEL - EHosrUN CON1HOL 35,600 1 -', 272 17,316 48 6 18,284 35,600 0
DURHAI'I - EfW[.IlIN CONTROL 5,000 0 :),000 5,000 0
PLANNING AND ~EN~DI~ l'IEAGUfH: 1, 343, 500 1 E17, 437 1 315,613 97 9 27,887 !' 343, 500 608,472- 734,491- 50l 7
,
RIVER FOREC~STING, OP ~< 1'11\11'1 IJ9,637 '.1,409 10ti, 892 88 5 13,745 119,637 0
S~lALL DA~lS, Clli.l'~ ~, ER cnNT 244 000 11, 265 25"! 111 103 3 8, 1 11- 244,000 0
----------------..------------------------------------- ---------------------------------------
TOTAL 2,911,389 .kr ,7,18 2, 85~l '194 98 0 58,395 2,911,389 611,872- 791, 600- 27 2
.---------------.---------------------------------------- ---------------------------------------
ENCUI'IBERANCE S MIl:: NOT I NCLUloED 1 N THE ACTUAl
lIH.i or\ I 11,11; :.i I t\ 't:'I"It'rH P,),}!:: 2
y PI~OCl<Al'1 l'I~lllllli HillINO t!~H...!.J1 nEP 109
f. X P I rJ U I 'I II It l: S REV E N U E .
-- . . ... .. - ~ - -~.__._- -- --.. -.-, . - .., - - .... .. - -.- ~~;~~~~~~~;;=~~;=~~~~;=~~~~~;~~===~~~~=~
- ---- --- ~----. - -..----.------..--
h,..r 0 \ r I) ,; f lIHOfi H'-T-D Y-r-o I.
iHlDOEJ j',\. flh\L hi' 111t\1 EXP AVAll-t'UU: 1I110GfT ACTUAL ACTUAL HEeD
- -.--- .--.--- - , .-.-- --- _':":;":::':'=~.o-;"";' ;;...;:...:,.;;::. g-;:;;::;.:~ =--=W1:;;J;;';:'; :;.:~~~
1/\ 1 ElC HH'i(oll'h I - II'; H.BflCUNl
;..:~..._.:...:..::_._...:... _1__.. ~_ ..;;.._ ---...
,l),'IINHiTRAllCiN IIAH:."FflUtH <.:J 1, ';!~N ,-!tJ,O.::U "- -1/, 20iJ 117 1 ::U" U 41 2 J L 239 3:)1- 2
.
A" 1 'I AL Pt=:v.:.....)? "llit! .. J, ::l:JI, 261 I 1.1.4'1-'1 J, 167, '/U:! /6, :3 363, 2 r'l 1. 531.261 2, r/l30- :)2, I~O- 3, '1
,JIOHEL WI: I'IANAGt:;I"UH ~U2.::l00 2 Ii, -104 '11/, /:J3 II 7 16",74/ 5132.~OO 0
IAIN"IENtINC!:: 0 2,3613- 2,366- 0
IJ
I
---- ---. ----- --- --- -_. -.... --. - - --------- -- -- --- _______________________M_______________
fffAI- 2,325.000 :j~I;~, 9:26 1" U~jj, 01'1 78 f) "91 9UQ C!,325.00\) 5,34B- 501.869- 2, '1
. _.-.__.._--.~ -- - - -.----.,.- - - ._ _ ___._______~..__._ __M...._~._._ ..--- -------...... ------- ------------ ---...---
,',jl,lIt1Ut.:'llMlCt: S MlL Nrff 1 NCLl/Ll1: U IN THE AC'(UAI.
01
I
UI
N
UI
8-526 - 1 -
FLOOD CONTROL
Erosion Control - Metro
Major remedial works have been completed at the Wynford Heights Crescent
site in the City of North York
Private revenues in the amount of $~1,300 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditure for this activity
Major work at Beaucourt Road has been completed The majority of the
work at Delroy Drive, on the Mimico Creek has been completed Final
restoration and revegetation of the site is scheduled for the Spring
of 1984
Erosion Control - Peel
Erosion control work on the Humber River, adjacent to Glasgow Road in
the Village of Bolton was completed
Erosion Control - York
Remedial works at Kirby Sideroad have been completed
Private revenues in the amount of $',400 00 which were received this
year but not included in the budget figure are reflected in the overall
expenditures for this activity
MAINTENANCE
Major Maintenance
Major repair work in the Lower Humber Channels has been completed The
rehabilitation of the Palgrave Dam is now complete A comprehensive
monitoring and structural investigation of the G Ross Lord Dam wa s
carried out arfd a repor~ prep~red
Regular main~nance of our water control structures has been carried
out withIn the established budget guidelines
PLANNING AND REMEDIAL MEASURES
Remedial Works
Channel improvement works have been in progress on the Main Branch of
the Humber River in Bolton Work for the Phase I 0 f the Bol ton Project
were completed in June of 1983
The remedial work contracted und er Ph a s e II of the Bol ton Proj ec t is
now substantially complete, although restoration around the King Street
bridge be required in the Spring of 1984 Also release of the holdback
monies will be due early in 1984
Erosion control remedial works have been initiated on the Highland Creek
as outlined in the Highland Creek Project '9~'1 Work on the two sites
identified for 199~, has been completed
Keating Channel Study
The Keating Channel Environmental Assessment report has been formally
subm it ted to the Ministry of the Environment for their review.
Environmental Planning
Collection of background data for input into Master Drainage Planning
is ongoing The land use map has been updated to reflect 1983 status
A detailed examination of flood susceptible areas is underway Field
studies are completed for the Environmental Inventories for the erosion
control program Reports will be drafted in the near fu t u I" e
/2. .
-
B-527
- 2 -
WATSRFRONT
----------
----------
Colonel Samuel Smith Waterfront Area
- Landfilling continued over the period with the result that 3 75
hectares of land have now been created
- The winter landfilling program has been approved
- The number of names on the waiting list for moorings now totals 140,
an increase of 7 over the reporting periud
- The City of Etobicoke, Humber College and the Ministry of Government
Services are all involved in a planning review of the future of the
Lakeshore Psychiatric Hospital
- Detailed planning of the final park layout is continuing in
conjunction with Metro Parks Department and Humber College
- Acquisition of the Provincial Crown Waterlot is proceeding
,
Humber Bay West
- Mimico Cruising Club has started construction of its clubhouse
- Etobicoke Yacht Club has approved plans for a c~ubhouse with
construction anticipated in 1994
- A master plan amendment to increase the mooring capacity from 500
boats to 700 boats has been approved by Metropolitan Toronto and
forwarded to Etobicoke for consideration
~estern Beaches
- The final design study for the hydraulic improvement at the mouth of
the Humber River is underway with construction planned for 19~4 if
funding is made available through ~etropolitan Toronto's Waterfront
Pollution Committee
- Staff is assisting the ~inistry of Snvironment and the Waterfront
Pollution Committee in deter~ining an appropriate programme of
remedial measures to reduce waterfront pollution
~quatlc Park
- T,e legal surveys delineating the vario~s property transactions have
been register~d and the applications for transfer of provincial Crown
Lands have been filed
- Background studies required for the Aquatic Park Planning Task Force
are continuing in preparation for the next meeting planned for early
in the new year
- Landfilling operations at the end of the endi~ement have concluded
for the winter and fill material is now being used to complete the
closure arms of Cell 3
Ashbridge's Bay
- The detailed planning of dredging works required for 19~4 is underway
in conjunction with Metro Works Department and the Toronto Harbour
Commissioners
/3 .
B-528
- 3 -
Bluffers Toplands
- The paving ~ontract at the Fishleigh Filtration Plant site is
completed
- The el ec tr ic al design and contract specification for site lighting
has been completed
- The landscaping of the site was substantially completed with only
minor grading and seeding to be finished in 1984
- Plans are being reviewed for the proposed development of the former
Seminary lands in an effort to address some of the concerns of
local residents
East Point Park
- Detailed planning of the road alignment and parking lot locations as
well as the stream and pond system is und er review Tn addition, the
details of electrical supply and sanitary sewers are being planned
- Metropolitan Toronto Parks and Property Department has identified
interest in developing the playing field complex as a Metropol i tan
facility so there wi 11 be some delay in the planning of these
facilities while Scarborough and Metro review this po s sib il it Y
Ajax Waterfront
- Deta iled planning of works to be implemented by M T R C A , Town of
Aj ax, the Rotary Club and Wimpey Construction is underway
Shoreline Management
- The first phase of shoreline protection for the Fallingbrook Dr i v e
area of Scarborough was completed
- The shoreline protection work proposed for South Marine Dr i v e wa s
stalled due to delays in issuance of the exemption und er The
Environmental Assessment Act However the access road from the
Guild Inn was completed and some materials were stockpiled
- Property negotiations are continuing in preparation for shoreline
protection along Springbank Av en ue and Lakehurst Crescent
- A Project for Erosion Control in Bellamy Ravine was adopted by the
Authority and rletropol i tan Toronto Funding arrangements are now
under consideration by the City of Scarborough and the Ministry of
Natural Resources .
- The Authority was retained by the City of Scarborough to implement
emergency shoreline protection works to protect a sanitary sewer
near Lakehurst Crescent which was endangered by erosion
C 0 E D Program
This program was very beneficial in a number of areas where crews were
able to complete various landscaping projects and al so participated in
erOSlon control work on Scarborough Bl u f f s In particular the Program
was used to supplement landscaping at Bluffers Park, Fishleigh
Fil tration Plant, Humber Bay and Ajax t\l so , staff employed und er the
program assisted in erosion control works at Fishleigh Dr i v e and South
Marine Drive
/4
-
8-529
- 4 -
Snvironmental Monitoring
- The 1982 Waterfront Monitoring Program report is complete in draft
form and will be finalized early in the new year
- Automatic temperature recorders were changed in November and will
remain in place until Spring 1984
- The 1983 program is complet~
- The 1983 field program at Colonel Samuel Smith Waterfront Area is
complete Discussions with the Ministry of the Environment on
sample procedures for 1984 are complete and changes will be
incorporated into the Agreement
- A request for exemption to The Environmental Assessment Act for the
South Marine Drive stabilization project was prepared and submitted
to the Minister, Ministry of the 'Environment The Advisory
Committee will report to the Minister by January 16, 1984
,
1984 01 12
BED/SH/md
.
/5.
OJ
I
U1
w
'IO THE 0iAIIWAN AND MEMBERS OF THE EXEnJTIVE <XJ.Mr.mEE, M. T. R.C .A., - II 23/83 PAGE I 0
F'RCM: JOHN W. MALEl'ICH, MANlIGER, DE.VI::I.DPMENl' a::Nl'ROL SEX:TICN.
RE Ar:MlNISTRATIOO OF OO'I7\RIO REXiUIATICN 170 - OCTOBER, NOVEMBER AND DECEMBER, 1983
LOCATION DETAILS OF VIOLATION NOTICE Em'. OFF:
INITIALS ACTION TAKEN
Town of Ajax V-529, Douglas & Kathleen C1uthe -Filling stopped
North Part Lot 12, Concession 3 October 21, 1983 DW -Working with staff on restoration
South side Taunton Rd (4th Concession Rd ) 3(b)
between Church St and Rotherglen Rd V-530, Region of Durham,
Duffin Creek Watershed Works Department
October 21, 1983 3(b)
TOWil of Pickering V-531, Robert & Edna Crosier -Filling stopped
Part Lot 8, Plan 270 November 8, 1983 DW -llorking with staff on restoration.
West of West Shore Blvd 3(b)
#501 Park Crescent I
Waterfront U1
, I
Town of Markham V-532, Mr William Rinas -Activity stopped I
Part Lot 30, Con 5 November 8, 1983 DW -Working with staff on restoration.
South side 19th Avenue between 3(c)
Warden Avenue and Kennedy Road
Rouge River Watershed
Town of Vaughan V-533, Swinton \lomes -All fill removed
Rear of Lots 75,76,77, Plan 65M-2154 November 23, 1983 DM -Area shaped and sodded to the satisfaction
Nos 17, 19 & 21 Sundown Court 3(b) of our staff and Town of Vaughan
Don River Watershed
City of Brampton V-534, Ercole & Vittoria D'Amario
Lot 41, Plan M-350 November 28, 1983 AW -Discussions regarding site restoration
Cynthia Cres , 3(c) are underway
Humber River Watershed
fL.
1984 01 06
PAGE II
'10: THE rnAIRMAN J\ND MEMBERS OF TIlE EXECUfIVE ca'lHTITEE, M.T.R.C.A.. - t 23/83
FRl>1: JOlIN W WILEl'ICH, MANAGER, DEVl::u:)pNUll' c.G11M:lL sa:-fIOO.
RE: J\D1INISTRATIOO OF rnI2\RIO RlnJLATIOO 170 - OCTUBER, NOV~WEK AND DEC~rnEK, 1983
LOCATION DETAILS OF VIOLATION NOTICE ENE'. OFf: ACTION TAKEN
INITJALCi
Town of Caledon V-535, Lauren & John Johnston -All activity has stopped.
EaSl side of tlwy USO DtlceUlber 5, 1983 All -o~ler will apply for a permit prior
Part of Lot 3, Con 7 (Bolton) 3(c) to pursuing auy further work
lIumber River Water..hed
Town of Pickering V-536, WllliaUl K Cherry -Filling stopped.
South Part Lot 13, Concession 7 ~ceUlber 20, 1983 OIl -Letter sent to TOWIl of PIckering
~or~h of 7th Concetlsion Road 3(b) re dumping without approval I
West side of Sideline No 12
Duffln Creek Watershed en
I
fL. to
1984 01 06 I
Ul
w
I--'
B-532
TO The Chairman and Members of the Executive Committee - M.T R C A
Wednesday, January 25, 1984
FROM T 1': Barber, Administrator, Information and E~ucation Division
RE INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT
October 1 - December 31, 1983
CONSERVATION INFORMATION SECTION
The Conservation Information Section carries out the Authority's general
information program, as well as programs relating to the resource
management activities and tRe marketing of the Authority's revenue
generating facilities - Black Creek Pioneer Village, the Kortright Centre
for Conservation and the Conserv~tion Areas, in addition to the marketing/
communications enhancement program funded by the Canada/Ontario Employment
Development Program
COMMUNITY RELATIONS - INFORMATION - GENERAL
Printing Highlights
- staff members continued distribution of the Authority General Brochure
and the 1983 Calendar of Events and Activities, as well as promotional
brochures on the Conservation Areas, Black Creek Pioneer Village and the
Kortright Centre for Conservation
- printing of the 1984 Calendar of Events and Activities (Winter and
Spring) and some distribution
- printing of 250,000 copies of the updated Authority General Brochure
- considerable work went into the preparation for printing of the 1983
Annual Report, including a new watershed map
- printing of invitations, programs, etc , for the Official Opening of the
Bolton Flood Control Channel and the Ceremonial Sod-Turning for the
Black Creek Pioneer Village Visitors Centre
Tours and Special Days
- staff made arrangements for
a) the Official Opening of the Bolton Flood Control Channel, by Jack
Johnson, M P P , Wellington-Dufferin-Peel, on Friday, October 14,
1983
b) the Ceremonial Sod-Turning for the Black Creek Pionee~ Village
Visitors Centre, by The Honourable Susan Fish, Minister of
Citizenship and Culture, on >,Iednesday, November 2, Ig83
c) a special Media Tour, "Preparations for Christmas,
Pre-Confederation Style", on Wednesday, November 30, 1983
d) the Twenty-Seventh Annual Authority Dinner, on Sunday, December 4,
1983, at the Boyd Conservation Field Centre
AudiO-Visual Highlights
- staff prepared an audio-visual presentation on the 19R4 Budget, for a
number of presentations
COM~UNITY RELATIONS - INFORMATION - RESOURCE MANAGEMENT
Printing Highlights
- reprinting and distribution of the Valley and Stream qegulations and the
Waterfront Regulations (French and English)
- translation, printing and distribution of the Italian version of the
Valley and Stream Regulations
B-533
- 2 -
Audio-Visual Highlights
- staff prepared an exhibit on watershed planning tha t \~as used by
the Ministry of Natural Resources until early December.
COMMUNITY INFORMATION - INFORMATION - PLANNING/MARKETING
Printing Highlights
- distribution continued during this period of the Black Creek Pioneer
Village Brochure, Conservation Area Map, Calendar of Events and
Activities, Wintertime Good Times Brochure, Authority General Brochure,
flyers on all different programs, and posters. This was carried out by
C O.E.D staff.
- the posters promoting Black Creek, Kortright and the Conservation
Areas have ;lroven to be very popular, as distribution continues
throughout the watershed The Kortright poster was recently displayed
in the Liquor Control 80ard of Ontario outlets in the region.
- Brochures Unlimited continues to distribute the Black Creek, Kortright
and Conservation Area Brochures in the Metro region, and throughout the
Niagara Peninsula in the case of the Black Creek and Kortright
Brochures
- staff ;lrepared and distributed 19 news releases, 7 photo releases,
13 synopses and 10 flyers, identifying and l;lromoting programs at the
Village, Kortright and the Conservation Areas, as well as 2 special
['rofiles on Black Creek and Kortright staff and 1 Kortright newsletter
- the Authority subscribes to the MacLean Hunter Press Cli;lping Service
and, for this ['eriod, recei '!ed approximately 780 press clips, which is
only a sample of the coverage the Authority receives
Special Programs
- a considerable amount of work went into the communications component
of the 1984 Marketing Plan In addition, a number of meetings were
held to ~rovide a great oeal of input into all aspects of the
Authority's marketing activities carried out by t!1e three operating
Divisions
- staff attends regular ~eetings of t!1e Attractions Council of the
Metro;lolitan Toronto Convention and Visi tors Association, as '>lell as
t!1e Executive ~eetings
- considerable work and olanning went into develol;ling the Visitors
Survey The summer portion of the survey '>las completed and the
material was keY-;lunched by staff
- the teleohone answering sales program on weekends and holidays continued
to be very successful
- material is being continually u;ldated and sup;llied to Infomart for the
l'eleguide units
- the word processing equipment continues to be used to enhance the
marketing of our facilities and programs.
Audio-Visual Highlights
- Ninter television promotions were sent to all the Southern Ontario
television stations, promoting Black Creek, Kortright and the
Conservation Areas
- arrangements were made and exhibits were set up at
- Sh09;ler's World (Albion)
- Bramalea City Centre
- Eaton Centre (t'>lice)
- Nes t'>lOOO Mall
- Cloverdale Mall
- Dixie Plaza.
~dvertising and Promotion
- arranged for special publici ty features '>li th
a) ~etropolitan Toronto Convention and Visitors Ass~ciation -
Discovery Guide, J!..ttractions and Happenings (bi-monthly)
B-534
- 3 -
b) Canada Century Home
c) Around Canada's Wonderland
d) Ontario Ski Map
e) Outdoor Canada Magazine
- brochures have been distributed at Ontario Ski Shows and exhibits, as
per an agreement with the Ontario Ski Counc il
Canada/Ontario Employment Development Program
This program has made a substantial contribution to the information
communications effort of the Authority Em[?loyees have been carrying out
an extensive Visitors Survey at all of the Authori ty' s facilities The
Summer survey was completed in September and this was followed by two
months of data [?rocessing to organize the material The Winter survey
has commenced Staff time has also been spent on distributing literature,
[)osters and flyers, throughout the watershed, [?romoting the Authority's
[?rograms and facilities Program staff members have also been assisting
with the telephone answering service.
,
CONSERVATION EDUCATION SECTION
The final quarter of 1983 saw the Authority's education programs achieve
most of their objectives and even go beyond
Residential Programs
- the residential Field Centres were able to maintain the 90% yearly
average occupancy level during this final quarter, despite declining
enrollments, ri sing transportation costs and in some cases, extensive
renovations;
- in add i tion to the regular groups of junior, intermediate and senior
level students using the Centres, some of the special user groups
included the Cathy Morris Workshop, North York Board of Education
Visual Arts Teacher Workshop, 666th Air Cadet Squadron, Residential
~ehabilitation Society, Junior Farmers' Association, Ontario College,
Toronto Montessori School, St Jeromes College, Trainable Mentally
Retarded, a private family group, the Conservation Authority Executive
Christmas Dinner and several in-house committee meetings
- The C 0 E D programs of construction and renovation at Albion Hills
and Lake St George Field Centres continue on target ~lready completed
at Albion Hills is the total renovation of the dormitory washrooms,
including modernization and wheel-chair access, the complete renovation
of all dormer '>lindows (including frames and glass) , the painting and
staining of all exterior walls, the gutting of both the boys and girls
domitories and the i r renovation partially completed Already eompleted
at Lake St George is extensive landscaping and grounds maintenance,
restoration of the horse barn, exterior staining and interior painting
of both dormitories, construction of a waterfront component including
docks, boathouse, and campfire pit, addition of interlocking patio and
pathways for the clormitories and the commencement of a major extension
to the pantry
Lease Agreement between the Metrooolitan Toronto and Region Conservation
Authorlty and the Board of EducatIon for the City of Etoblcoke
- the construction of the Etobicoke Environmental Education Field Centre
is well under way with the work presently concentrated on the interior
Completion dat~ is sti 11 set for early March, 1984 The Advisory
Committee have met and are oresently working on a final budget for
19A4 The contract for the construction of a mud rool'l/foyer
has been awarded and the kitchen renovations will be done in February
1984
B-535
- 4 -
Kortright Centre for Conservation
- the 1983 attendance figures at the Centre show 72 ,500 visitors,
down somewhat from the 1982 attendance figure of 77 ,000; the projected
figure for 1983 was 90,000, the figure of 72,500 includes over
29,000 students participating in a specialized education program
- dud ng this final quarter there were a wide variety of programs,
attractive to all ages and interests, including In Pursui t of Natural
Trivia, Myths and Magic of the Forests, Hurricane Hazel Remembered,
Bird Feeder Worksho~, Sawmill Tours, We're for the Birds and Christmas
in the Coun try.
- special Saturday programs i nvol ved large numbers of Girl Guides,
Brownies, Boy Scouts and Beavers; as well there were teachers'
workshops, a staff training day and various receptions and conferencesl
meetings.
- during this quarter, artists in residence were Marc Barrie,
Laurel Campbell Stark, Bill Ivy and Ken Strasser.
- thanks to a variety of Government sponsored labour-intense programs
and funds raised by the Foundation and from various Ministries,
several development projects were completed in 1983 - Marsh Viewing
Facilities, 1?orestry Trail, !:lhase II of the Land Theme Building,
!:'isheries Project and the Water Theme related mosaic
- the Fish and Wildlife Theme programs have been very 90pular with
visito):s; preliminary discussions have been held to expand the
Wa~er Theme ~rograms to include oarticioation from the Ministrv of
the Environment; a 2 year extension of the Renewable Energy Theme
Program is in the final stages of discussion; preliminary discussions
are presently underway to establish both a Land Theme Program and a
F~restry Theme Program.
- The construction of the Woodland Pavilion (part of the Centre Core Plan)
has commenced, as part of the C.O.E D. project.
Day Proqrams
- the day ?rograms at both Cold Creek Conservation Area and Black
Creek Pioneer Village, continue to he fully supported by the Boa rd s
of Education with the usual age and grade range of participants;
1,10ck bookings continue at Cold Creek through the Metro Separate
School '3oard and the Toronto Board and at Black Creek through the
Metro Separate School Board and the Scarborough eoard
- some of the special programs at ~lack ~reek included the "Trip in
Time" program with York University; this program will be expanding
even more next year and several very successful Teachers' Worksh09s
\t Cold Creek there was the add i tion of a new program entitled,
"Firearm Safety and Shooting Skills"
Tot'al attendance for all education programs in 1983 was 151,250.
B-536
TO The Chairman and Members of the Executive Committee, ~ T R C A
FROM T E Barber, Administrator
Information and Education Division
RE FINANCIAL PROGRESS REPORT 1983
--
PROGRAM ADMINISTRATION
BUDGET ACTUAL SURPLUS
$415,370 $392,133 + $23,237
COMMUNITY RELATIONS INFORMATION
BUDGET ACTUAL
$181,370 $178,233 + $ 3,137
COMMUNITY RELATIONS EDUCATION
BUDGET EXPENDITURE ACTUAL EXPENDITURE
$1,715,083 $1,620,076 + $ 3,165
BUDGET REVENUE ACTUAL REVENUE
$1,401,150 $1,343,597
COMMUNITY RELATIONS EDUCATION B C P V
BUDGET EXPENDITURE ACTUAL EXPENDITURE
$157,500 $129,440
+ $16,931*
BUDGET REVENUE ACTUAL REVENUE
$163,500 $152,371
DEVELOPMENT
BUDGET ACTUAL
N/A
$114,800 $ 40,901
Overall Surplus $ 45,470
* included in Historic Sites Budget
Financial Comments
1 A surplus of 23,237 in program administration was produced by an under
expenditure on benefits, a maternity leave and unexpended funds for a
computer reservation system
2 Reduced expenditures and a corresponding reduction of revenue in the
conservation education program resulted from a new staffing formula in
the Conservation Field Centres
3 The Black Creek Pioneer Village Education Programs produced a surplus of
$16,931 partly as a result of the volunteer program and donated materials
4 The Development budget is expended as funding is available from the
M T R C F Some $62,000 for an audio trail system will be available in
the first half of 1984 and a road at Albion Hills Conservation Field
Centre was not required as a result of relocation of the Etobicoke
Centre
1984 01 25
TEB/P
8-537
To The Chairman and Members of the Executive Committee, M T R C A.
From Mr R K Cooper, Administrator, Historical Sites Division
Re Progress Report - October 1 to December 31, 1983
HISTORICAL SITES PROJECTS (Development)
Construction on the Visitors Centre is about 3 weeks behind
schedule
The Tinsmith/Hardware Store has been erected and work is progress-
ing on completing the structure.
Landscaping around the Nesbitt Sawmill has been started
HISTORICAL SITES PROJECTS (Operations & Maintenance)
(a) Registration and Artifacts
To date, during the last quarter of 1983, 11 donors have given
approximately 100 items to Black Creek, including textiles, tools, an
upright piano, a music stand, a table, an early flax wheel, two oil paint-
ings, an 1850 pine cradle and a handmade bedspread
(b) Publicity and Promotion
During the final quarter of 1983 considerable progress was made
towards working to increase visitation to Black Creek through promotion to
community groups and via the media
To ensure the success of one of our new programs for fall, "Celebrate
The Apple Harvest", Village staff prepared an assortment of foods made with
apples and packaged them in a basket wrapped in cloth Later they were
delivered in person by Lorraine O'Byrne and Neil Beaudry to several Toronto
media personalities The benefits from this endeavour were realized almost
immediately, as radio stations CFRB, CHFI, CKEY and CBC provided excellQnt
free coverage of the event the following morning
On Sunday, October 16, Mel Lastman, Mayor of the City of North York,
and his wife Marilyn, CBC television hostess Barbara McLeod, and CFTO
reporter Glen Cochrane were on hand for the Village's first ever "Celebrity
Bake Off", held in the Town Hall Joining them as their culinary coach was
well-known cooking school director, author and radio personality, CFRB Etta
Sawyer This part of the day's program provided a superabundance of enter-
tainment for the large crowd who jammed the Town Hall to view the antics
and, to a lesser degree, skill of the participants Among the captive
audience were cameramen from CBC and CITY-TV who filmed segments of the
event for broadcast later
Another first on this same day was the "Home Baking With Apples
Contest" Entry forms, contest rules and program flyers were distributed
to most schools in the Metro region, Women's Institutes, 4-H Clubs in Peel,
York and Durham regions, and to all Metro senior citizens' clubs and service
clubs. Also, a special class was established for Village citizens.
To keep costs to a minimum,. gain additional exposure for the event
and, moreover, to cultivate future corporate sponsorships for the Village,
support in the form of judges and prizes was Obtained from Canada Packers
Ltd , Robin Hood Multifoods, General Mills of Canada, Toronto Life Magazine,
Maple Leaf Mills, and Canadian Living Magazine Many important contacts
were made for the Village on the day of the event Meetings have already
been established with Robin Hood and Canadian Living Magazine to discuss
sponsorship of special events during the Bicentennial year and the develop-
ment of food related articles during 1984 respectively Canada Packers
has agreed to be the sole sponsor of the baking competition next year
Starting in January we will be meeting with them to discuss ways to further
promote the event co-operatively
Prior to the "Celebrity Bake Off" and "Home Baking With Apples Con-
test", Lorraine O'Byrne was interviewed by CFRB radio to discuss Thanksgiv-
ing and "Celebrate The Apple Harvest" After the event, the Toronto Star
B-538
- 2 -
newspaper provided excellent free coverage of the program by printing a full
page of photos highlighting the activities offered at the Village during
fall
This year's "Pumpkin Party For Kids" was heavily promoted through
the distribution of over 7,000 flyers to all Girl Guide and Brownie clubs
in the Metro Toronto region, and to each child who visited the Village on
an educational tour, in advance of the first weekend of the program Con-
sequently over 600 children took part in the "Hobgoblins' Parade" on the
final day of the event
"DO-IT-YOURSELF" magazine published a feature article on the Village
toy-maker in its November/December issue Arrangements have been made to
provide them with stories over the next year
"Christmas In The Village", the final event for 1983, received much
attention from staff, the media and the Toronto community Following is a
list of the variety of ways in which awareness of the program was communicated
to the general public
(i) A graphic artist was hired to prepare a new design for a flyer to promote
the event emphasizing the many activities available for visitors in an
improved, more authentic format Over 5,000 copies were distributed to all
Toronto and area media, senior citizens clubs, day-care schools and recreat-
ion centres in North York
(ii) Lorraine O'Byrne and Jean Hayward appeared on CKVR television to discuss
preparations for an early Ontario Christmas and the Percy Band Collection of
19th century toys (Dec 14th) Jeanne Hughes was interviewed on the CBC
radio program "Fresh Air", and Neil Beaudry on CKO Radio to discuss Christmas
activities at Black Creek Channel 47 and CFTO-TV filmed segments of the
Christmas program, for broadcast to their viewing audiences during Christmas
week
(iii) Two Village interpreters participated in Harbourfront's special week-
end program "Gifts and Decorations The Old-Fashioned Way", providing demon-
strations of decoration-making to the visiting public, and information
regarding our own Christmas program
(iv) The Airport Skyline Hotel set up a special exhibit on traditional
Christmas foods with much assistance from Margaret Hesp, Village registrar
Several artifacts were rented to the hotel to be placed on exhibit, and
brochures on the Village Christmas program were on hand for guests of the
Skyline
(v) A "Christmas In The Village" exhibit was placed in the Ontario Travel
Kiosk - Toronto Eaton's Centre window Flyers were given to the travel
counselling staff at the Centre, for distribution to the general public
(vi) Members of the Toronto media were invited for a special tour of the
Village as decorated for an early Ontario Christmas Over 30 of them
responded to our invitation and were provided with a guided tour of the
Village Photographs were provided for them to be used with any articles
they developed
(vii) Toronto Star Crafts columnist, Ankaret Dean, visited the Village to
prepare an article on hand-made decorations featuring those on display in
the Village homes The article appeared on Christmas Eve
(viii) Good coverage of the "Christmas In The Village" program was provided
in three consumer magazines 'En Route', 'Town and Country' , and 'Key To
Toronto'
In November CBC used the Village Blacksmith Shop as the location
for segments of two productions One was with David Suzuki of "The Nature
of Things", and the second with Jim White, Food Editor of Toronto Star, for
"Market Place"
CFRB held their 18th annual Christmas service and reception at
Black Creek The service, taped at the Fisherville Church, was broadcast on
Christmas Day
Students from the Museum Technology course of Algonquin College,
Ottawa, toured the Village and met with the Curator The Director of the
Ukrainian Village, Edmonton, spent the day consulting with the Curator of
Black Creek A director from the National Capital Commission was sent to
- 3 - B-539
Black Creek to see the Mill and to discuss the principles of its operation
and interpretation with Village staff
Black Creek and the Ontario Historical Society hosted a seminar
on nineteenth century Folklore at the Village Black Creek was also the
location for the Tool Collectors meeting in October
Village staff have been involved in the presentation of Ontario
Historical Society workshops on the Bicentennial at Timmins, Milton and
Otterville, Ontario
Jeanne Hughes has spoken on the Village and Village programs to
the Brampton Kiwanis, the members of the Upper Canada Miniature Workshops,
the North Leaside Ladies Group, the Business and Professional Women's Group
at Timothy Eaton Memorial Church, the Salvation Army, the Canadian Women's
Historical Society, and the Parkdale Golden Foundation Mr Russell Cooper
spoke at the 25th annual Christmas luncheon of the C W Jeffreys Chapter
of the I O.D E.
Artifacts from ~~e Village collection have been used once again
on cac's "Reach For The Top" quiz The Village has also set up a special
Christmas exhibit in the main lobby of the Skyline Hotel for the month of
December
(c) Program and Special Events
From October 1 to December 31, 1983, the following ~pecial events
were offered to visitors to Black Creek
(i) October 1, 2, 8, 9, 15 and 16 - "Celebrate The Apple Harvest" This
event had new components in 1983 and due to its success will be repeated
next year
(ii) October 22, 23, 29 and 30 - "Pumpkin' Party For Children" and "Hobgoblins'
Parade" (O~tober 30 only)
(iii) November 5, 6, 12 and 13 - "Crafts Festival" This event was another
first-time event for the Village We were fortunate to have the participat-
ion and support of twelve different artisans, each of whose speciality was
old-t~e crafts Inclement weather conditions reduced the attendance during
the days of the Festival However, it was a very appropriate e~ent for the
Village and will be re-scheduled next year
(iv) November 19 - December 31 - "Christmas In The Village" This year
members from 14 different ,Church choirs have been involved in providing
weekend carol singing at the Village Mr Reginald Twiselton co-ordinated
the volunteer carollers, arranging for singers on every Saturday and Sunday
before Christmas during the Christmas in the Village program
For the second year, Mr Gordon Sillito, a teacher at Unionville
Public School, and his students have volunteered on several weekends befare
Christmas to bring the Dickson Hill School to life Nith the enthusiastic
support of the school, its teachers and many parents, this group have con-
tributed a truly excit~ng component to the Christmas program Students
decorated the 1860's schoolhouse with handmade decorations, talked to the
visitors, prepared and distributed C~ristmas goodies and spent some time
working in other Village buildings as "apprentices"
An application for a Bicentennial Programming grant, through
Wintario, was submitted to the Ministry of Citizenship and Culture for their
consideration If funding is awarded, it will be applied towards the cost
of staging a two day Bicentennial Jubilee on June 9 and 10
Neil Beaudry visited the offices of Robin Hood Multifoods in late
December to seek their assistance in the co-ordination of "Festival for
Children" , a new special event planned for May The prospectus looks good
as they are extremely interested in financing and conducting a series of
home-baking activities for young children during the festival. More
planning meetings are to be held over the next few months
Masonic Lodge Foundation Stone Laying
More than 1500 Masons from allover Ontario participated in a
colourful ceremony to lay the Foundation stone of the Masonic Lodge and
Tinsmith/Hardware Shop at Black Creek on Saturday, October 1 Grand Master
of the ceremonies was Dr Ronald E Groshaw, who heads over 100,000 Free
Masons in Ontario
"-
B-540 _ 4 _
Visitors Centre Sod Turning
During a sod turning ceremony on November 2, 1983, the Honourable Susan
Fish, Minister of Citizenship and Culture, presented the first installment
of a $1 25 million Lottario grant, for the construction of the Black Creek
Pioneer village Visitors Centre to Emil Kolb, Chairman of the Visitors
Centre Sub-Committee, and Mrs Florence Gell, Chairman of The Metropolitan
Toronto and Region Conservation Authority
During the final quarter of 1983, 13 weddings, 12 wedding recepitons, 2
Church services and 20 banquets were held in the Village This brings the
total number of weddings held in the Village in 1983 to 52, with 39
receptions held in the Half Way House dining room In addition, the
restaurant also hosted 27 evening banquets during the year.
The Dickson Hill School program continues to be fully booked In October,
November and December, 11 classes attended The total number of students
participating in this proglram in 1983 was higher than in 1982, indicating
larger numbers of students per class
The total number of citizens for 1983 was 401, compared to 409 in 1982
The COED Program awarded to Black Creek allowed for the hiring of 26
interpreters, 6 maintenance workers and 1 Registrar's Assistant The
program was in effect throughout most of 1983 Extra interpreters made it
possible to keep all restored buildings open to the public and to provide
essential staff for numerous special events The additional maintenance
staff augmented the regular maintenance workers in many areas, including
the painting of buildings, boardwalk maintenance and toy production One
COED worker has been providing full-time assistance to the livestock
department and another has been working with the Curator of Textiles in the
production and maintenance of Village staff costumes The Registrar's
Assistant has worked on cleaning and painting storage areas, building
storage bunks and, under strict supervision, on treating and restoring a
number of collection agricultural implements
(d) Buildings and Grounds Maintenance
Fall maintenance has included the preparation of the grounds and gardens
for the winter, and the storage of summer grounds keeping equipment The
gardener prepared and installed the greenery and trees for Christmas in the
Village buildings
The lower floor of the Dalziel Barn was closed off and winterized for its
use in the Christmas program
With the start of the construction of the Visitors Centre, Black Creek
maintenance staff removed the old entrance arch, relocated and repaired the
donors' gazebo, erected the large sign acknowledging contributors to the
Centre and cleared all trees and fencing in the construction site and
surrounding area
The barrels throughout the Village, used to house fire hydrants and hose,
have all been checked and repaired Window repairs have been completed on
the Pioneer Life Building and at the Rose Blacksmith Shop New carpet was
installed on the stairs in the Half Way House dining room.
A parking control system has been established in the Village parking lot to
eliminate the excessive free use of the Lot by York students
A large paddock has been fenced in behind the Sawmill
Financial Comments
Village attendance during the last quarter of 1983 began to show improvement
and was the strongest segment of the y~ar compared to 1982 Although the
attendance declined in the last three months, it declined by less than 1%
and in fact during the "Christmas in the Village" program a small increase
was enjoyed
- 5 - B-S4l
The overall decline in attendance for 1983 was 42,772. Correspondingly,
the gate revenues suffered a decline of ~76,998.00. The final quarter saw
an upswing in sales revenue from village outlets and gift shops with an
increase of more than ~11,000 00 over the same period in 1982.
Unfortunately, the year end totals for sales outlets is still down by just
under ~38,000 00
B-54fo The Chairman and Members of the Executive Committee, M T R C A
- Meeting 1/23/83
FROM P B Flood, Administrator
Conservation Land Management Division
RE Progress Report - Conservation Land Management Division
PROGRAM ADMINISTRATION
This report covers events, activities and project accomplishments throughout
1983 Considerable administrative staff time was spent in coordinating
projects under various special employment projects
The largest project, COED ($820,000 and up to 57 employees) commenced in
April and progress on prjects is well underway CCDP programs are continuing
in York-Peel and Brampton-Georgetown ridings The Ontario Riding project has
concluded The Experience '83 Program commenced in May and employed 26
students on various projects through August
Under the Provincial Works Sector Program, the Fisheries Enhancement and
Parks Sector projects concluded in Mav The Forestry Stimulation project
was concluded in September and a new project - Conservation Area Improvement -
is continuing to March 16, 1984
WATERSHED RECREATION - PLANNING
The planning priority for 1983 was the Boyd Conservation Area Master Planning
Study Over the past three months, design and costing details of the
preferred plan have been finalized As part of the process, an implementation
staging program was developed taking into account the development priorities
and budget constraints of the Authority By year end, a draft of the study
report had been completed for staff review
Work on master planning studies for the Albion Hills, Claireville and Heart
Lake Conservation Areas continued during this period To date, COED
technical staff have completed the environmental inventories and constraint
mapping for each of these areas A preliminary screening of development
ideas has also been carried out
Under the Canada Community Development Program, major sections of the
Operation/Management Plans for each Conservation and Forest and Wildlife
Area has been written These documents, when approved, will provide a
summary of the management philosophy and operating procedures for 'each
facility and/or program offered by an Area Grounds maintenance practices
for turf, tree and shrub management will also be addressed
WATERSHED RECREATION - DEVELOPMENT
The Albion Hills washroom and picnic shelter and the Indian Line Campground
control building and supervisor's residence were the two major development
projects for 1984 By acting as its o!"n general contractor, the Authority
was able to upgrade the quality of construction materials used in both these
facilities as well as provide for attractive landscaping treatments of the
immediate surrounding area
During this time, the Authority also completed the design and construction of
a new entrance sign fpr the Cold Creek Conservation Area, The new sign,
which measures 9' x 24', is the first major step in the Authority's new
signage program designed to establish distinctive and unique image for
each Area
With labour and materials provided by COED, the development program for 1983
was considerably expanded Proj ects completed included the following
- at Claireville Conservation Area, an equestrian centre and
extensive trail system were constructed
B-543
CLM PROGRESS REPORT
Page -lA
- at Cold Creek Conservation Area, an additional 325 square feet
were added to the existing trap range building to provide office
space, refreshment facilities and meeting room
- at Indian Line Campground, the turning circle lias paved and lock
stone pathways were installed around the newly refurbished
gatehouse and control building
- at Bruce's ~Iill Conservation Area, major structural repairs
were made to the 1859 grist mill Improvements were also
made to the interior of the picnic pavilion
The COED Program also provided two crews to work on upgrading and standardizing
Area signage and painting projects throughout the watershed.
WATERSHED RECREATION - OPE~~TIONS
During the first quarter of 1983, the usual 6 Conservation and 2 Forest and
Wildlife Areas were open for public use Due to the abnormal lack of snow,
normal winter recreation activities were not possible. The Albion Hills and
Bruce's ~Iill ski programs were able to offer limited facilities on 3 and 2
weekends, respectively Only 5 groups at Albion Hills and Z groups at Bruce's
~Iill were able to participate in the instructional program In an effort to
reduce costs, ski staff were released early None of the scheduled winter
Special Events were held. During the fall, cross-country ski trails and
equipment were prepared in preparation for the upcoming season By late
December, the X-C program was in full operation at Albion Hills and Bruce's
Mill
B-544
C~l PROGRESS REPORT
Page -2
Monthly Retreiver Trials were held during spring and late fall at both
Claireville and Cold Creek The Bruce's Mill Maple Syrup Demonstration
began the first weekend of March, a week earlier than usual Attendance for
organized school tours was 4,281, a decrease of 502 over last year General
public attendance was 14,249, an increase of 507 over 1982
During January, the annual delivery of 45,000 Rainbow Trout fry was received
at the Glen Haffy hatchery This fish will provide the "Put and Take"
stocking supply for the Glen Haffy ponds, Heart Lake and other Areas in
1984 In July, a successful "Fish Derby" was held with 8 lucky anglers catching
tagged fish and winning prizes donated by Molson's and Ruko Canada
The lack of winter recreation activity permitted Area staff to carry out more _
than the usual amount of routine maintenance and repairs to buildings, grounds-
and facilities This work was augmented by 2 Special Employment programs At
Bruce's Mill, 2 young workers were employed under the Winter Experience Program
to assist with maintenance and program preparations At Claireville, Heart
Lake and Boyd Areas, two 3-men crews started work under the 1983 Canada
Community Development Program (CCDP) These workers assisted with building
and picnic table cleaning and painting and also accomplished considerable
landscape tree pruning in picnic areas This program continued throughout
the summer and expanded to all Areas
Under the Authority's COED program, 10 workers have been hired to assist
Conservation Area staff with regular operations and maintenance These
additional workers have assisted in upgrading maintenance standards to levels
in previous years A crew of 3 workers at Indian Line Campground carried
out new planting and maintaining all plantings They also assisted in all
ground maintenance work at the campground
The Experience '83 program has provided 2 crews of three students to work on
Area nature trails At Claireville and Heart Lake, pruning and surfacing
has been completed along with preliminary assessment of the Albion Hills
trail The eastern crew completed pruming and surface improvements to trails
at Bruce's Mill, Greenwood and Petticoat Creek An additional 13 students
were employed as gate and boat concession atrendants
At Cold Creek, 154 people attended the eight Hunter Education Courses conducted
by the Area Superintendent In response to demand, section staff, in con-
sultation with I&E Division staff, have revamped the Shooting Skills Program
for school groups and this program is being offered to grades 7 and up starting
in September
During the winter, Sporting Clubs used the ranges for 2 "Ham Shoot" competitions,
The Upper Canada Rifle Association held a monthly event during April - June
and September In June, the National Golden Retriever Trials were held at
Cold Creek The Radio Controlled Flying Club of Toronto hosted it's annual
Fly-In in early August A major dog show - Sporting Dog Exhibition - involving
21 breeds was held at Cold Creek in October During the fall, 4 "Turkey
Shoot" competitions sponsored by sporting clubs were held
All Areas were in operation for summer activities by early ~lay with the seven
swimming areas opening as scheduled the first weekend of June During July
and early August, high bacteria counts resulted in the closing of Boyd,
Claireville and Bruce's Mill swimming areas Bad algae growth at Heart Lake
also forced periodic closing of that swimming area The Petticoat Creek pool
successfully operated throughout the summer and was used by 77,659 swimmers,
an increase of over 77% over the previous year
At Heart Lake, a public boating program was established opening the lake to
private non-motorized water craft The weekend ORCA canoe instruction programs
at Claireville again were well received with 58 participants attending the
eight courses
/
In an effort to reduce operating costs, the group (school) instructional
pvogram was dropped However, equipment was rented to 3 groups to run their
own program The Claireville water ski site was used for 4 tournaments
including the Ontario Championships
CLM PROGRESS REPORT 8-545
Page -3
At Albion Hills, the Rambling Hills Riding Club held their monthly horse show
The new public riding program at Claireville began operation in June and was
well received by visitors The Remedial Riding Association held a "Ride-a-
Thon" in Claireville to raise funds for their work with the handicapped
During the winter, Petticoat Creek staff again carried out the annual inventory
of all Authority vehicles and equipment and the annual inventory for the Land
Management Division of all Area tools, equipment and furnishings Division
staff also devoted considerable time to preparation and processing of Tenders
for the Authority's acquisition of replacement vehicles, tractors and equipment
All items including 5 replacement rrucks and 4 tractors have been received
Through the winter, Division staff organized a training seminar on Chainsaw
maintenance and safe "felling" techniques This program sponsored by the
Ontario Pulp and Paper Makers Safety Association, was attended by staff from
various Authority locations and has been very favourably received by all
attending It is a valuable addition to the Authority safety program A
tractor maintenance seminar sponsored by the Ford Motor Company was held for
operating staff involved in tractor operation Two Conservation Area
supervisors and the Safety Officer attended the MNR Enforcement Course and
successfully passed the test requirements They will be eligible for future
appointment as Provincial Offences Officers to enforce the Authority's
Conservation Area Regulations In early JulY, all lifeguard staff attended a
two day cardio pulmonary resucitation course to improve the level of lifesaving
skills available for emergencies
Division staff were actively involved in promoting Area recreation facilities
by staffing displays at the Camping on Wheels and the Canadian National
Sportsmens Shows Emphasis in both displays was on Conservation Area
recreation facilities Revisions have been completed and updated information
pamphlets printed for campground operations, boating programs and range
operation Copy for the individual Area brochures was revised and printing
and distribution completed Considerable input was provided by Division
staff into the preparation of the new "Conservation Areas Brochure" This
brochure has been well received by Area visitors
The following table shows Area attendance for the period January 3/83 to
January 1/84 It shows an increase of 7,116 people or 0 7" over the same
"
period in 1982
ATTENDANCE AT CONSERVATION AREAS, JANUARY/83 TO JANUARY/84
1983 1982
Albion Hills 131,729 145,996
Boyd 142,177 142,315
Bruce's /vii 11 147,674 157,526
Claireville 125,246 133,545
Cold Creek 43,707 40,344
Glen Haffy 55,912 64,662
Greenwood 60,647 66,362
Ileart Lake 91,778 76,619
Indian Line 53,129 57,889
Pal grave 3,818 9,509
Petticoat Creek 156,138 110,774
Woodbridge 13,378 12,676
1,025,333 1,018,217
B-546
CLM PROGRESS REPORT
Page -4
CONSERVATION LAND ~~NAGE~ENT PROGRfu~
Job creation programs funded by the Federal and Provincial Governments have
enabled the Authority to accelerate resource management projects on Authority,
public and privately olmed lands within the Ivatershed
On Authority owned lands, staff hired under the Canada Community Development
Program and the Parks Work Sector Program carried out woodlot and plantation
management projects in the following locations
Bolton Resource Management Tract - 288m3 (80 cords - fuelwood)
Glen Major Resource Management Tract - 4,5~Om of fire guard maintenance
Glen Haffy Forest and Wildlife Area - 504m 9140 cords pulpwood)
- 540~3 (150 cords - undersized pine
- fuelwood)
- 1,600m of fireguard maintenance
Claremont Forest and Wildlife Area - 3,500m of fireguard maintenance
Palgrave Forest and Wildlife Area - 1~500m of fireguard maintenance
Bruce's Mill Conservation Area - l30m~ (36 cords - fuelwood)
In total, 6 hectares of plantation in the Glen Haffy Forest and Wildlife Area
have been thinned Upgrading of firebreaks and access roads included grading,
grass seeding, brush and rock removal and pruning
Forest management work including thinning, selective cutting and fire guard
maintenance will continue into 1984, utilizing the Parks Sector and COED
job creation programs Sites include the Glen Haffy, Palgrave, Claremont
and Bolton properties
As part of the Resource Management Tract Program, Conservation Area staff have
continued to maintain existing fireguards in the Glen Major, Goodwood, Glen
Haffy and Pal grave Areas
Three thousand, one hundred meters of fencing have been constructed in the
Claireville Conservation Area and Bolton and Nashville Resource Management
Tracts to control unauthorized motor vehicle access and garbage dumping The
Parks Sector Job Creation Program has provided the labour and materials for
this work
Under the Fisheries Work Sector Program, which started in the fall of 1982,
staff developed and posted 8 km of fishing trails in the Bolton Resource
Management Tract and 4 km in the Claremont Forest and Wildlife Area Six
fishing piers were also constructed for the Heart Lake Conservation Area
It is anticipated that the installation of these piers will enhance the fishing
opportunities in the lake
This summer, the Authority took part in the Conservation Services Experience
'83 Sub-Program A total of 560 meters of cold water fish h~bitat was improved
on two private properties located on the headwaters of the Humber River
Eroding streambanks were stabilized and artificial bank covers, deflectors and
in-stream boulders were installed On a third private property, a 80m eroding
streambank was stabilized
The Authority has also worked in cooperation with Save Our Streams, an
organization dedicated to enhancing fisheries habitat They completed stream
improvement projects in the Claremont and Palgrave Forest and Wildlife Areas
Signs were erected on location acknowledging the contribution of M T R C A
Reforestation projects were completed on Authority lands with 50,000 seedlings
planted at the Glen Major Resource Management Tract, 6,000 at the Palgrave
Forest and Wildlife Area, and 14,000 for the Lake St George Forest and Wildlife
Area Boy Scout groups have planted 10,000 seedlings at the Bolton Resource
~[anagement Tract, 5,000 at the Cold Creek Conservation Area, 5,000 at the Boyd
Conservation Area, and 10,000 at the Glen Najor Resource Management Tract
Planning projects for resource management programs on Authority owned lands
are continuing Regular staff and those working on the Forest Stimulation, COED
and Parks Sector Work Programs have undertaken forest inventories on 14
properties including
B-547
CDI PROGRESS REPORT
Page -5
Bolton Resource Mgmt Tract Kolodziej Forest & Wildlife Area
~ashville Resource Mgmt Tract Palgrave Forest & Wildlife Area
Goodl...ood Resource ~Igmt Tract Cold Creek C A
Glen Major Resource ~gmt Tract Albion Hills C A
Glen Haffy Forest and Wildlife Area Bruce I s ~Iill C A
Heart Lake C A. Claireville C A
Greenwood Forest & Wildlife Area Ebenezer Resource Mgmt Tract
MUlti-year forest management plans are being finalized for these properties
with the remaining rural Authority properties to follow
Wildlife inventories including breeding bird census have been completed for
Glen ~lajor, Bolton and Nashville Resource Management Tracts In addition,
I.ildlife habitat delineation is finished for these same properties This
information will be utilized in the formation of wildlife management plans
and will be incorporated in the resource management plans
To assist the Black Creek Group, a community environmental group, a IHldlife
inventory, hab1tat an~lysis and stream assessment was completed for the Black
Creek from Finch Avenue to its source
With the assistance of the COED and Experience '83 programs, staff have inven-
toried the rivers and streams on Authoritv properties in the rural areas This
information together with the forestry, wildlife and other existing data will
be used to complete the overall resource management plans for Conservation
Areas, Forest and Wildlife Areas and Resource Management Tracts
An Authority land reforestation inventory has been prepared which summarizes
all the plantings on M T R C A property from 1957 to present A similar
inventory of past erosion control and fisheries improvement projects has also
been compiled To date, approximately 35 kilometers of work on streams has
bel3n completed
Agricultural land rental reviews have been carried out on thirteen Authority
lands to date
Approximately 47,525 reforestation trees were planted this spring for 20 land-
owners A total of 16,043 wildlife shrubs and 3,753 trees were planted in
the spring and fall under the Tree and Shrub, and Urban Wildlife programs
An additional 40 container stock conifers were sold for windbreak purposes
Two Conservation plans have been completed this year and a further 2 are on
file To date, 35 CORservation plans have been completed for private landowners
One reforestation subsidy has been approved for 19,000 trees Orders are on
file for the spring of 1984 for reforestation trees, 2,310 trees and 2,820
shrubs There are orders on file for 7,000 reforestation trees for the spring
of 1983
A questionnaire was prepared and delivered to a select number of landowners
in the headwa-eers of the Duffin Creek, a high priority area for the application
of private land conservation management programs Attitudes tOI...ards, and
:he existing state of reforestation, woodlot management, and ESA management
were surveyed The survey will be expanded to other headwaters areas in 1984
\ total of 205 site visits were carried out - 61 in Peel, 56 in York and 85
in Durham The high number of site visits in Durham reflects 72 which were
carried out in relation to the questionnaire These site visits are carried
out to provide private landowners with advice on reforesta~ion, tree and shrub
planting, urban wildlife, windbreaks, wildlife habitat, erosion control, ESA
management, and ponds
Planting activities for private lands programs include continuing inventory of
past assistance programs, a land use review of major watershed to priori:e
project locatio~s and continuing agricultural land use review
Staff have currently been working on programs for ESA management on Authority,
private and public lands To assist in this project, both a priority and
preservation list of ESAs have been prepared This priority list was based
on research of existing information and communication with other staff and
agencies and categorized ESAs on their need for management due to present and
potential impacts Presently, 58 ESAs have been field inventoried for impacts
and a management strategy for each has been prepared indicating recommendations
for the management of these ESAs
B-548
CLM PROGRESS REPORT
Page -6
These management strategies will be incorporated into resource management plans
where required, will aid in identifying priority areas for the private landowner
assistance programs, and will be utilized during discussions with public
agencies
Promotion for Services Programs has included to date, the circulation to cable
T V outlets a video tape of the Conservation Services slide presentation and
news releases for various assistance programs A slide presentation on the
Density Bonus Program will be completed in the near future
Inventories have been completed for 90% of the primary and secondary water-
courses within Metro Toronto and surrounding municipalities for the Urban
Management Program The spring of 1983 saw three planting projects completed
for the Rouge and Don Rivers and Highland Creek
Two hundred and ninety-five trees and 1,300 wildlife shrubs have been planted
In addition, approximately 200 meters of valley slope have been graded and hydro-
seeded at the Etobicoke General Hospital along the Humber River Plantings
were also carried out for the City of Brampton with 4,450 seedlings, 100 trees
and 890 shrubs being established
In the fall of 1983, under the assistance of the COED program, 7 planting
projects have been completed for the Humber, Rouge and Don Rivers and Highland
Creek Fifty caliper trees, 266 deciduous trees, 4,410 wildlife shrubs and
1,383 container stock have been planted In addition, another 85 trees and
735 wildlife shrubs have been supplied to two community groups - Black Creek
Group and the North Toronto Collegiate Environmental Study Students to initiate
revegetation projects on the Black Creek and East Don River Three private
landowners were supplied with 85 deciduous trees and 310 wildlife shrubs to
rehabilitate their valley slopes Approval in principal has been reached with
the City of Brampton for a joint project to be conducted in 1984 on public
lands
Landscape projects have been carried out at the following locations
(1) Humber Bay West Launching Ramp
(2) Bluffer's Park
(3) Fishleigh Filtration Plant
(4) Ajax Waterfront
(5) Indian Line Campground Entrance
(6 ) Frenchman's Bay
( 7) Saddle House - Claireville Conservation Area
(8) Glen Major Gravel Pit
(9) (9) South Thackeray Sanitary Landfill Site
(10) Bolton Channelization Project
The Authority nursery program supplied trees and shrubs to various tree
planting and landscape projects as well as to the Flood Control Section, MNR,
South Lake Simcoe, and Kawartha Lakes Conservation Authorities and Save Our
Streams Under the COED program, staff have assisted in accelerating the
production of plant material used on job creation projects
Six landowners were assisted in the Tree Moving Assistance Program
The nursery sales for 1983 have been finalized
Available
Spring Fall Total Spring 1984
B R Trees 5,145 2,286 7,431 5,060
B R shrubs 23,608 22,980 46,588 40,425
Container Stock 2,092 1,566 3,658 1,694
Caliper stock 666 217 883 980
IIp
1984 01 19
<::rn PBCGRESS REPORr 8-549
FINANCIAL STATE~ENT
YR TO DATE ~ BUDGET
EXPENDTTURES EXPENDITURES BUDGET USED
Administration 730,140 673,204 108 5
Watershed Recreation Planning 62,~84 75,000 33 ~
Conservation Area
Development lR6,515 131,960 102 5
Operations ~ Maintenance 2,075,518 2,149,000 96 6
Conservation Land
Management Planning 119,091 118,500 100 5
Conservation Management 307,098 109,181 99 1
Fisli Rearing 10,591 10,500 100 9
Operations - Non-Revenue ~0,171 ~1,000 98 0
REC'O TO r. BUDGET
REVENUES 19~2 SUDGET DATE REC'O
Operations \ Maintenance 1,016,000 1,008,289 99 2
Sonservation Management 114,000 148,694 111 0
FINANCIAL COMMENTS
PROGRAM ADM!NISTRAT!ON
Costs have exceeded budget by ~57,OOO The major portion of this resulted
from much greater increase than anticipated for employee benefit premiums
Other factors contrlbuting to the overspending were budget reduction
for gapping, higher data processing costs than anticipated, additional
travel costs associated with supervising special employment projects and
extra supplementary staff costs ~t Central Workshop to maintain operation
during prolonged sick leave for regular staff Spending reductions in
uther Division programs hav~ offset this cost
oLAHNTNG ~ DEVELOP~EnT
The planning budget was under spent due to the fact that fewer meetings
were required to complete the public participation component of the Boyd
~aster Planning Study
Overall expenditures for facility development were slightly higher than
projected Extra cost was incurred fabricating specialty items for the
Al~ion Hills washroom building and picnic shelter
CONSERVATION AREA OPERATIONS
Expenditures were $73,500 under budget resulting from spending reduction
done to offset revenue shortfall from early year lack of winter activities
and reduced summer attendance due to water quality problems
~ctual revenue shortfall was ~8,OOO December revenues considerably
exceeded the normal amount thanks to excellent early winter snow conditions
Revenue from food services operation contributed ~10,OOO more than budget
estimates
CONSERVATION LAND MANAGEMENT
The Conservation Management and non-revenue operations budgets for 19~3
were under spent by a total of ~2,712 The Fish Rearing program was
overspent by ~91 and the Conservation Planning budget by $591 All program
objectives for these 1983 budgets were met The revenue for Conservation
Land Management Program exceeded projections due to a very active nursery
and woodlot management program Additional revenues of ~14,694 were
received