HomeMy WebLinkAbout2021-09-10_Minutes_Executive_CommitteeToronto and Region
Conservation
Authority
Executive Committee Meeting was held via videoconference, on Friday, September 10,
2021 pursuant to section C.12 of the Toronto and Region Conservation Authority's Board
of Directors Administrative By -Law. The Chair Jennifer Innis, called the meeting to order
at 9:33 a.m.
PRESENT
Jennifer Innis
Chair
Jack Heath
Vice -Chair
Ronald Chopowick
Member
Dipika Damerla
Member
Joanne Dies
Member
Jennifer Drake (in: 9:48 a.m.)
Member
Xiao Han
Member
Gordon Highet
Member
Linda Jackson
Member
Anthony Perruzza
Member
ABSENT
Paula Fletcher Member
Maria Kelleher Member
The Chair recited the Acknowledgement of Indigenous Territory.
RES.#677/21 -
Moved by:
Seconded by:
MINUTES
Joanne Dies
Ronald Chopowick
THAT the Minutes of Executive Committee meeting, held on June 11, 2021 be approved.
CARRIED
Section I — Items for Board of Directors Action
RES.#B78/21 - CITY OF TORONTO
Receipt of a request from the City of Toronto, for a permanent easement
for the Martin Grove Road Watermain Replacement Project for lands
located east of Martin Grove Road and north of Rathburn Road,
municipally known as 305 Martin Grove Road, in the City of Toronto,
required for the Martin Grove Road Watermain Replacement Project,
Ravenscrest Park, Mimico Creek watershed (CFN 64472).
Moved by: Ronald Chopowick
Seconded by: Gordon Highet
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS Toronto and Region
Conservation Authority (TRCA) is in receipt of a request from the City of Toronto for the
conveyance of a Permanent Easement onTRCA-owned lands located east of Martin
Grove Road and north of Rathburn Road, municipally known as 305 Martin Grove Road in
the City of Toronto, required for the Martin Grove Road Watermain Replacement Project,
Ravenscrest Park, Mimico Creek watershed;
AND WHEREAS it is in the best interest of TRCA in furthering its objectives as set out in
Section 20 of the Conservation Authorities Act to cooperate with City of Toronto in this
instance.
1i:IA7:47i7:7:8>l:11911119 7��i710:11 Bib .I_r, I • , • ur-r1. • ft3e7_Qr=I-
containing
Pi -
containing 0.352 hectares (.87 acres), more or less, of vacant land, required for the Martin
Grove Road Watermain Replacement Project, Ravenscrest Park, said lands being Part of
Lot 12, Concession 1 Fronting the Humber, Borough of Etobicoke in the Municipality of
Metropolitan Toronto (now City of Toronto) being part of PIN 07453-0056 LT, designated
as Part 2 on Sketch No. PS -2020-069, dated October 26, 2020, in the City of Toronto, be
conveyed to the City of Toronto.
THAT consideration be the nominal sum of $2.00 and all legal, survey and other costs to
be paid by the City of Toronto;
THAT the City of Toronto is to fully indemnify TRCA from any and all claims from
injuries, damages or costs of any nature resulting in any way, either directly or indirectly,
related to this easement;
THAT an archaeological investigation be completed, with any mitigation measures being
carried out to the satisfaction of TRCA staff, at the expense of City of Toronto;
THAT a landscape plan be prepared for TRCA staff review and approval, in accordance
with existing TRCA landscaping guidelines at the expense of City of Toronto;
THAT a permit pursuant to Ontario Regulation 166/06, as amended, be obtained by City
of Toronto prior to the commencement of construction, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
The City of Toronto has requested the conveyance of TRCA-owned lands, located east of
Martin Grove Road and north of Rathburn Road, municipally known as 305 Martin Grove Road,
in the City of Toronto, required for the Martin Grove Road Watermain Replacement Project,
Ravenscrest Park, Mimico Creek watershed.
The subject TRCA-owned lands were acquired from City of Toronto, on October 23, 1974 under
the Mimico Creek Flood Plain Lands Project (P7A-13).
Attachment 1 is a sketch illustrating the location of the subject lands. Attachment 2 is an
orthophoto illustrating the location of the subject lands.
RATIONALE
The City of Toronto has conveyed lands to TRCA over the years for nominal consideration of
$2.00 and has requested that TRCA lands required for the Martin Grove Road Watermain
Replacement Project, Ravenscrest Park, be conveyed for a nominal consideration of $2.00.
All lands disturbed by construction will be restored by City of Toronto in accordance with Ontario
Regulation 166/06 permit.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
The City of Toronto has agreed to assume all legal, survey and other costs involved in
completing this transaction.
Report prepared by: Cheryl Waters, extension 5859
Emails: chervl.waters(aDtrca.ca
For Information contact: Cheryl Waters, extension 5859
Emails: chervl.waters(cDtrca.ca
Date: August 11, 2021
Attachments: 2
Attachment 1: Site Plan
Attachment 2: Orthophoto
Attachment 1: Site Plan
0
Zn
Ay
NOR•' : o
O
N t t PV REst pR
RpVENsC
N QRS
SpV t'O
Permanent
Z Easement
OG
?� Gtee
F
MART y1CW
SRT
m
P
'INBV N Ro "'
Legend �� Toronto and Region
Conservation YORK DURHAM
Authority
...... PEEL
TORONTO
SITE �exe om.na
-hment 2: Orthophoto
A
4,�' ft
I
�w
,
c. -
Permanent
Easement
u
RES.#B79/21 - KINGCAL PROPERTIES AND MAINTENANCE INC.
Proposal from Kingcal Properties and Maintenance Inc. to enter a lease
renewal of Toronto and Region Conservation Authority (TRCA) owned
land to operate and maintain a property maintenance and management
company located north of Rutherford Road and west of Pine Valley Drive,
municipally known as 4948 Rutherford Road, in the City of Vaughan,
Regional Municipality of York, Humber River watershed (CFN 39525).
Moved by: Ronald Chopowick
Seconded by: Gordon Highet
THE EXECUTIVE COMMITTEE RECOMMENDS THAT WHEREAS TRCA is in receipt of a
request from Kingcal Properties and Maintenance Inc. to enter into a lease agreement to
operate and maintain a property maintenance and management company located north
of Rutherford Road and west of Pine Valley Drive, municipally known as 4948 Rutherford
Road, City of Vaughan, Regional Municipality of York, Humber River watershed;
AND WHEREAS it is in the opinion of TRCA that it is in the best interest of TRCA in
furthering its objectives, as set out in Section 20 of the Conservation Authorities Act, to
cooperate with Kingcal Properties and Maintenance Inc. in this instance;
THEREFORE, LET IT BE RESOLVED THAT TRCA enter a lease with Kingcal Properties
and Maintenance Inc. for the use of 0.60 hectares (1.50 acres), more or less, said land
being Part of Lot 16, Concession 7, municipally known as 4948 Rutherford Road, City of
Vaughan, Regional Municipality of York;
THAT the lease with Kingcal Properties and Maintenance Inc. be subject to the following
terms and conditions:
(i) that the term of the lease be for 1 year together with an annual renewal option
for the next four years at the sole option of TRCA;
(ii) that consideration be $18,900 per annum, plus HST, with an annual increase of
5 percent throughout the term of the lease, plus HST;
(iii) that Kingcal Properties and Maintenance Inc. be responsible for all approvals,
maintenance and costs required for the construction and operation of a
property maintenance and management company;
(iv) that Kingcal Properties and Maintenance Inc. be responsible for all costs
associated with the removal of any equipment and materials associated with
the construction and operation of their property maintenance and management
company, at the end of the lease term, and restore the site to the satisfaction
of TRCA.
(v) any other terms and conditions deemed appropriate by the TRCA staff and
solicitor;
THAT said lease be subject to the approval of the Ministry of Natural Resources and
Forestry in accordance with Section 21(2) of the Conversation Authorities Act, R.S.O.
1990, Chapter C.27, as amended, if required;
AND FURTHER THAT authorized TRCA officials be directed to take the necessary action
to finalize the transaction, including obtaining any necessary approvals and the signing
and execution of documents.
CARRIED
BACKGROUND
At Executive Committee Meeting #8/07, held on October 26, 2007, Resolution #A230/07 was
adopted in part as follows:
"THAT... Toronto and Region Conservation Authority (TRCA) has been requested by
Kingcal Properties & Maintenance Inc. to enter into a lease arrangement for lands
situated at 4948 Rutherford Road, Vaughan, known as the Former Nursery Workshop
site;
...THAT TRCA enter into a lease of approximately 0. 60 hectares, more or less, (1.5
acres) of land with Kingcal Properties & Maintenance Inc., for the operation of a property
maintenance and management business and wholesale nursery business said land
being Part of Lot 16, Concession VII, City of Vaughan, Regional Municipality of York;
THAT the lease with Kingcal Properties & Maintenance Inc. be premised on the
following:
(i) the initial term of the lease will be for three years, with two renewal options for
successive one-year periods, subject to the concurrence of TRCA to the
renewals;
(ii) the lease rate is to be $1,271.67 per month;
(iii) Kingcal Properties & Maintenance Inc., has agreed to lease the lands in 'as
is' condition;
(iv) TRCA shall continue to have exclusive use of 760 square feet at no cost,
(v) any other terms and conditions deemed appropriate by TRCA's solicitor..."
TRCA is currently in receipt of a request from Kingcal Properties and Maintenance Inc. to renew
their lease agreement for their business operation located north of Rutherford Road, and west of
Pine Valley Drive, municipally known as 4948 Rutherford Road, City of Vaughan, Regional
Municipality of York, Humber River watershed. Known as TRCA's Former Nursery Workshop
site, given the successful construction of TRCA's Restoration and Infrastructure Campus, TRCA
no longer utilizes 760 square feet of the building under lease to Kingcal Properties and
Maintenance Inc. as part of this commercial lease agreement.
Since entering into the original rental agreement with Kingcal Properties and Maintenance Inc.
in 2008, TRCA has continued to renew the agreement with the tenant on an annual basis, for
the operation of their business for the wholesale distribution of trees, shrubs, and garden
nursery items, as well as the storage of equipment in connection with the distribution and
operation of the aforesaid, excluding retail sales.
During Kingcal Properties and Maintenance Inc.'s tenure, their annual rental rate has been
increased by approximately eighteen percent, from the 2008 annual rate of $15,260 plus HST,
to an annual rate of $18,000 plus HST for the 2020 lease period. With this lease renewal, the
annual rental rate would be increased by five percent, to an annual rental rate of $18,900, plus
HST, for the 2021 lease period.
Although the tenant requests a term of ten years for this lease renewal, TRCA cannot enter into
lease agreements for terms longer than five years without provincial approval. TRCA therefore
recommends a one-year lease renewal with the option of four one-year extensions, at the sole
option of TRCA, with a five percent annual increase in rent, plus HST.
With this lease renewal, Kingcal Properties and Maintenance Inc. would continue to assume all
responsibility for the lands under lease, which would include but not be limited to all costs
pertaining to any renovations, repairs, utilities, and at the time of lease termination, any site
restoration expenses that may be required and to the satisfaction of TRCA.
Attachment 1 is a sketch illustrating the location of the subject lands. Attachment 2 is an
orthophoto illustrating the location of the subject lands.
Lease Agreement
The area subject to this lease consists of approximately 0.60 hectares (1.50 acres) of land. The
following are the key terms and conditions of the proposed lease arrangement:
1. Lease Payment: $18,900 per annum together with an annual increase of five percent,
plus HST;
2. Initial Term: 1 year, together with four one-year extension options, at TRCA's sole
option;
3. Insurance: Kingcal Properties and Maintenance Inc. will provide five million in
commercial general liability insurance;
4. Utilities: Kingcal Properties and Maintenance Inc. will be responsible for all applicable
utilities;
5. Further Approvals: Kingcal Properties and Maintenance Inc. will comply with any
applicable laws, directions, rules, and regulations.
RATIONALE
Renewing the lease agreement with Kingcal Properties and Maintenance Inc. would be in the
best interest of TRCA in furthering its objectives as set out in Section 20 of the Conservation
Authorities Act, allowing for continued revenue generation, supporting financial sustainability of
TRCA's commercial leasing portfolio.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
FINANCIAL DETAILS
Rental revenue generated from this lease will be used for TRCA purposes and applied to
account code 002-43-030.
Report prepared by: Lisa Valente, extension 5297
Emai Is: I isa.valente(&trca.ca
For Information contact: Andrew Savor, extension 6477
Emails: andrew.savor(dtrca.ca
Date: July 30, 2021
Attachments: 2
Attachment 1: Site Plan
Attachment 2: Orthophoto
Attachment 1: Site Plan
Fast
B�
Lease
/ Area
0
r7 —777-1
ANQ
ERF�Rp R
or
oti
�C
F
Toronto and Region
Conservation
YORK DURHAM
Authority
T PEEL SITE
TORONTO
�exe omm�o
Htiacnmem z:
, a" AyL_
Lease
Area
O Ft0
x
iN (c Pvrtv� ''✓
VVv P
Toronto and Region
Conservation
Authority
PEEL'
"'.OW..
Section II — Items for Executive Action
REQUEST FOR TENDER FOR EROSION CONTROL WORKS AT 70
MAIN STREET SOUTH, CITY OF MARKHAM
Award of Request for Tender (RFT) No. 10036272 to retain a contractor
to implement remedial erosion control works, including the supply of all
labour, equipment and materials required for implementation. The project
is located at 70 Main Street South, in the City of Markham.
Moved by: Jack Heath
Seconded by: Ronald Chopowick
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in a project
that requires the implementation of erosion control works, including the relocation of an
emergency access route outside of the erosion hazard limit;
AND WHEREAS TRCA solicited tenders through a publicly advertised process;
THEREFORE, LET IT BE RESOLVED THAT Request for Tender (RFT) No. 10036272 for
Erosion Control Works at 70 Main Street South be awarded to R&M Construction at a
total cost not to exceed $270,879, plus applicable taxes, to be expended as authorized by
Toronto and Region Conservation Authority (TRCA) staff;
THAT TRCA staff be authorized to approve additional expenditures to a maximum of
$27,088 (approximately 10% of the project cost), plus applicable taxes, in excess of the
contract cost as a contingency allowance if deemed necessary;
THAT should TRCA staff be unable to negotiate a contract with the above-mentioned
proponent, staff be authorized to enter into and conclude contract negotiations with
other Proponents that submitted quotations, beginning with the next lowest bid meeting
TRCA specifications;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals
and the signing and execution of any documents.
CARRIED
BACKGROUND
In early 2014, the homeowners of 70 Main Street South flagged erosion related concerns to
TRCA's Erosion Risk Management staff. It is believed that the erosion and slope stability
concerns were a result of the July 8, 2013, severe storm event which caused widespread
flooding, erosion, and slope failures throughout the Greater Toronto Area (GTA). Representative
photos of the erosion can be found in Attachment 2 — Site Photos.
As such, in 2015, TRCA retained Terraprobe Inc. to conduct a geotechnical investigation at the
70 Main Street South property. The geotechnical investigation results indicated that the main
dwelling is located a safe distance to be impacted from the slope instability. Despite risk to the
home being low, the driveway is located within the erosion hazard which is the emergency
access route to the dwelling. Given the risk to the driveway, Terraprobe Inc. proceeded to
develop conceptual designs to address the erosion issue and associated risk.
A Class Environmental Assessment for Remedial Flood and Erosion Control Project (Class EA)
was initiated in 2018. Throughout this process, the concepts were evaluated, and it was
determined that the preferred remedial solution was "Concept 2: Tableland Improvements and
Continual Monitoring." The preferred alternative involves the realignment of the driveway at 70
Main Street South, restoration of the erosion scour near the slope crest, and continual
monitoring. In late 2019, TRCA retained GEI Consultants Inc. (formerly Mooney Metaxas
Engineering Inc.) to develop detailed designs for the 70 Main Street South property based on
the preferred concept. The proposed detailed design includes the relocation of the driveway
outside of the erosion hazard, construction of an armourstone retaining wall, construction of a
concrete toe wall, implementation of drainage improvements, and tableland restoration.
TRCA has negotiated contribution requirements with the landowners as per TRCA's Private
Landowner Contribution Policy for Erosion Control Works (2017). TRCA will execute an Erosion
Control Agreement (ECA) with the landowners prior to implementation of the project.
RATIONALE
A Request for Tender was publicly advertised on the public procurement website
www.biddingo.com on July 16, 2021 and closed on August 6, 2021 at 12:00 pm. A mandatory
bidder's meeting and site tour was held on July 27, 2021. A total of seven (7) individuals
registered at the bidder's meeting. The bidder's meeting was facilitated in accordance with the
procedures of Incident Management System during the COVID-19 pandemic.
One (1) addendum was issued on July 29, 2021 to respond to questions received.
A total of twelve (12) contractors were noted as 'full document takers' on Biddingo for the RFT
documents and three (3) digital tender submissions were received via www.biddingo.com from
the following Proponent(s):
• Loc -Pave Construction
• Metric Contracting Services Corporation
• R&M Construction
The Procurement Opening Committee opened the tenders on August 6, 2021 at 12:01 pm with
the following results:
Proponent
Fee (Excl. HST)
R&M Construction
$270,879
Loc -Pave Construction
$282,798
Metric Contracting Services Corporation
$302,429
The tender from Metric Contracting Services Corporation was disqualified because they did not
include mandatory documentation components within their tender submission.
Staff reviewed the bid received from R&M Construction against its own cost estimate and has
determined that the bid is of reasonable value and meets the requirements as outlined in the
RFT documents. Therefore, it is recommended that contract No. 10036272 be awarded to R&M
Construction at a total cost not to exceed $270,879, plus 10% contingency, plus applicable
taxes, with it being the lowest bid meeting TRCA's specifications.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 2 — Manage our regional water resources for current and future generations
FINANCIAL DETAILS
Funds for the contract are allocated from TRCA's York Region erosion funding under the main
account of 189-84. The cost of executing this contract, including all staff time and associated
costs to manage the project, is being tracked under account 189-27.
Report prepared by: Nikki Cordy, extension 5512
Email: nikkolai.cordy(aDtrca.ca
For Information contact: Matt Johnston, extension 5525
Email: matthew.iohnston(a)trca.ca
Date: August 6, 2021
Attachments: 3
Attachment 1: Map of Project Location
Attachment 2: Orthophoto of Project Location
Attachment 3: Site Photos
MProject Area
�— Watercourse
MeanderBelt 2020
L
J Regulation Limit
TRCA Property
Parcel Assessment
�4 Toronto and Region
� Conservation
Authority
Project
Area ....
PEEL'
M
Attachment 3: Site Photos
Figure 1. View of tableland conditions facing west; the erosion scour (surrounded by orange safety
fencing) has grown in size since the initial inspection.
Figure 2. Slope crest with view of bare and unvegetated erosion scour on the slope crest facing east
towards the Main Street South roadway.
RES.#B81/21 - STANDING OFFER SUPPLY FOR INFORMATION TECHNOLOGY
SOLUTIONS
Adoption of Kinetic Group Purchasing Organization (Kinetic GPO)
contract for Information Technology infrastructure equipment, hardware
products, and related services (Contract No. 10035438).
Moved by: Linda Jackson
Seconded by: Xiao Han
WHEREAS Toronto and Region Conservation Authority (TRCA) is engaged in ongoing
business operations that require IT infrastructure equipment, hardware products, and
related services;
AND WHEREAS Kinetic GPO has solicited and evaluated proposals through a publicly
advertised process for a standing offer method of supply for information technology
solutions;
THEREFORE, LET IT BE RESOLVED THAT TRCA staff be directed to utilize the Kinetic
GPO contract (#17-02) for the supply of network technology products and services for
the balance of the contract term ending in October 19, 2022;
AND FURTHER THAT authorized TRCA officials be directed to take whatever action may
be required to implement the contract, including the obtaining of necessary approvals
and the signing and execution of any documents.
CARRIED
BACKGROUND
TRCA business operations require Information Technology infrastructure hardware, software,
solutions and services including, but not limited to:
• Data Centre Solutions;
• Wired and Wireless Networking;
• Power and Cooling;
• Software; and
• Professional and Managed Services.
CDW Canada, a leading provider of technology solutions for Canadian private and public sector
organizations has been awarded the standing offer contract with Kinetic GPO, which allows
CDW Canada to offer guaranteed minimum discounts, as well as unmatched levels of service,
advice, and support from expert teams.
RATIONALE
Kinetic GPO is a cooperative purchasing organization established for Broader Public Sector
entities across Canada with the specific purpose of leveraging group buying to reduce
procurement costs. Kinetic GPO has conducted a competitive procurement process to establish
an Information Technology Solutions (#17-02) contract with CDW Canada.
The Kinetic GPO contract is available to Broader Public Sector agencies which allows TRCA to
leverage the goods and services provided by CDW Canada.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategic priority set forth in the TRCA 2013-2022 Strategic
Plan:
Strategy 7 — Build partnerships and new business models
Strategy 10 — Accelerate innovation
Strategy 11 — Invest in our staff
FINANCIAL DETAILS
Based upon a review of business operations initiatives scheduled for implementation during the
contract period, the anticipated costs for the requested goods and/or services are approximately
$400,000, plus applicable taxes. CDW Canada understands both the potential cost and
resource implications associated with changes in workload. The goods and/or services will be
provided on an "as required" basis with no minimum hours guaranteed.
Funds for the contract are identified in the 5 Shoreham Office project budget and ITRM Capital
and Operating budgets.
Report prepared by: James Dong, extension 5357
Emails: james.dong(a�trca.ca
For Information contact: James Dong, extension 5357
Emails: james.dong(a)trca.ca
Date: August 17, 2021
Section III — Items for the Information of the Board
2021 SIX MONTH FINANCIAL REPORT
Receipt of Toronto and Region Conservation Authority's (TRCA)
unaudited expenditures as of the end of the second quarter, June 30,
2021, for informational purposes.
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT the 2021 Financial Report for the six-month period ending
June 30, 2021 be received.
CARRIED
BACKGROUND
As part of TRCA's financial governance procedures, staff are presenting the 2021 Six Month
Financial Report, which covers the period from January 1, 2021 through to June 30, 2021. This
report provides information on the spend rate of expenditures for the first six months of 2021.
RATIONALE
TRCA believes in transparency and accountability for its spending, revenue recognition and
performance of service delivery objectives against approved budgets, for both the organization
and for each project and program as an individual endeavour. This is further supported by
TRCA's core values of integrity, collaboration, accountability, respect and excellence. TRCA
recognizes that all projects and programs offered have cost implications and that all costs
incurred are reasonable and practical in support of services. Transparency throughout the
budget management process is achieved in part through the analysis and reporting on year to
date revenues/expenses as compared to the current fiscal year budget. In order to improve the
accuracy in reporting anticipated issues in expenditures, TRCA established a seasonal
forecasting baseline using historical data from the past three years to estimate the seasonal
variances within each program area.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
FINANCIAL DETAILS
The capital and operating report by Service Area and underlying Program Areas are provided in
Attachments 1 and 2 respectively. The attachments provide a summary analysis of
expenditures to date and the variance explanations by Program Area which have a variance
threshold of +/- 10% and $500,000 from anticipated quarterly spend rates. Variances within
these thresholds are deemed to be within the expected range. The capital report contains eight
reportable variances for the six-month period, whereas the operating report contains one
reportable variance. Attachment 3 provides explanations for each reportable variance.
DETAILS OF WORK TO BE DONE
Staff are constantly analyzing TRCA's 2021 operations in the context of COVID-19's impact on
the organization's revenues and expenditures and potential for government funding to reduce
the negative repercussions of restrictions to our staff complement, while ensuring that the safety
of staff and the public is maintained. Staff will continue to provide quarterly financial updates to
the Board of Directors. More detailed information on COVID-19's year to date impacts can be
found in the report titled 2021 COVID-19 Six Month Update.
Report prepared by: Jenifer Moravek, extension 5659
Emails: jenifer.moravek(a�trca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: michael.tolensky(aDtrca.ca
Date: August 3, 2021
Attachments: 3
Attachment 1 - Capital Budget Expenditures
Attachment 2 - Operating Budget Expenditures
Attachment 3 - Variance Explanations
ATTACHMENT 1: CAPITAL BUDGET EXPENDITURES
Watershed Planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
Biodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement
Greenspace Management
Waterfront Parks
Conservation Parks
Trails
Black Creek Pioneer Village
Events and Festivals
Environmental Assessment Planning and Permitting
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
Living City Transition Program
Community Engagement
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Grand Total
Q22021 Anticipated Q22021 Actual Q22021 Vadante
expenditure
Anticipated I Anticipated Q2 Actual Actual Q2Spend $Difference 1 1% Difference Reportable
79,202,367 I 44%1 50,699,589 I 28%1 28,)02,7]8
B
E
G
H
ATTACHMENT 2: OPERATING BUDGET EXPENDITURES
Watershed Planning and Reporting
Climate Science
Water Resource Science
Erosion Management
Flood Management
Bodiversity Monitoring
Ecosystem Management Research and Directions
Forest Management
Restoration and Regeneration
Greenspace Securement
Greenspace Management
Rental Properties
Waterfront Parks
Conservation Parks
Trails
Bathurst Glen Golf Course
Black Creek Pioneer Village
Events and Festivals
Wedding and Corporate Events
Development Planning and Regulation Permitting
Environmental Assessment Planning and Permitting
Policy Development and Review
School Programs
Newcomer Services
Family and Community Programs
living City TranaRlpn Program
Community Engagement
Social Enterprise Development
Financial Management
Corporate Management and Governance
Human Resources
Corporate Communications
Information Infrastructure and Management
Project Recoveries
Vehicles and Equipment
Grand Total
ED 2021 ArMcipated
Q22021
Actual
Q22021 Viola...
Expenditure
Anticipated
Anticipated
Actual
Actual WSpend
$Difference
%Dloference
Reportable
Expenditures
Spend l%)
Expenditures
Rate (%)
Expenditures
Spend Rate
Variance
............. 228,020
........... 52%.............
224.....
..
........ 51% ........
3,602
...............
1%
...............
0%0%
0%
..............
0%
........... ................
0%
........ .... ........
....
...............
0%
.....
... .............
...............
..............
.....
........... ................
0%
......... ................
21,269 .. ............_......................................
............... ........
44%
...............
121,]69)
.....
44% .....
...............
..........
.........
_______ 462,147
......... ... ........
___________ 45% ________
... .......
458,854___________
.... .... ......
45% ..........3,292
............
..... .....
0%
..........
.............. 3,.8263%
........... .............
286
....
5%
............... ...............
3,495
58%
.....
...............
_____________________
o %
9999_..... 9999
_______..,.._
a%
a%
33,527
___ 9999
28%
_______..,.._
36,32330%
)
..............
.............. 202,6]9
........... .............
.....V..%..............
..
120.....
........ ... ........
........ 28% ........
...............
82.104..........
1.9;..
..... ............
..............
........... ..........
0%
..
. . . 359
..... ...........
. . . 0%
............
1359 . )
. . .
0% %
..... ............
441,253
73%
479,834
80%
136,581)
-6%
.............. )88.221
.....
........... 55% ..........
545.145...........
38% ........
..
243.0]6..........
D%
.....
...............
0%
0%
0%
.........
1-----32
........ .........
35%%
..
2,109,202
...... ......
42%%
,,...
------81)
...,.. .....
-6%
..... .........
...---------------0---------------._
..............
........... .............
..
0%.....
............... ...............
...._-%.....
.....
.............
...............
.. .,..,..,..
43539
3,..,..,.,.
28% .,.,.
.,...
8.,8
6..8 ..
.,..,.. 7%.... ....
..........
943,193
46%
748,850
36%
194,342
9%
.............. ]9,18865%
........... ...........
14,093 ..
12%
............... ................................
_.__ 95 65,0
54%
.....
________________________
...............
...............
...........
0%
..
........ ... ..............................
0%
.....
0%
...............
..,..,..,.., 35)8,552,,,,,,,
49%,....,
299....
,..., 41%,.
620,J3J,....,
9%
.,,..., 2365,007
...., 50%,,,,,,,
2083,154,,,...,
44%...,
281,853,....,
6%
319,125
56%
239,440
42%
)9,681
14%
999,,,1,,,
1,54.....
.....
47%
..
1,169,467
36%
.. ..
3.1,689
,.....
11%%
....
.............. 480.220
........... 49%.............
395.4 ] 1............
40%.........
.. .............
9%
399,280
...., 45%.,....,
265,52..
..., 30% 1.11.1,.,
..
133,.52,..,,..,
15%
.....
...............
39%
6,014
0%
(6,014)
39%
.............. 23.9]6
........... 62%............
1,....
........ 4%.........
..
22,4]8..........
58%
.....
...............
..........
0%0%
......... ........
..
........ ........................
0%
.....
...............
..............
_._ 1,635,482
........... ................
48%
1,503,28
............... ........
44%
...............
_ 132,210
_. 9999__
.....
4%
...............
.............. 398 683
........... 66Yo.............
3390.35)...........
56%. ........
95_32_.....
595,326..........
LO%..
.
...............
.........................
908008
.............
49%
..
601286
..... .
... ........
33%
.. .......
298,8. 2 2 .
.....
. . 16%
...............
888,.865..
......0
40%
206,.15
12%
..............
10.0999
........... .............
41%
..
93569]
........ ... ........
36%
......._
135,28)
..... .....
5%
..... ............
1,351,6831
_. 34%
(1,7L'.....,334�
43%
. 363,65]
-9%
.
18,151)
12%
39,284
-25%
(9,435)
31%
21,216,684
51%
17,658,275
42%
3,558,409
9%
ATTACHMENT 3: VARIANCE EXPLANATIONS
CAPTIAL REPORTABLE VARIANCE NOTES - EXPENDITURES (Figures in 000's)
A
The higher than anticipated expenditures are related to the disposal of the non -ecologically significant portion of the Tampion
lands. Once this is taken into consideration, the variance is $0 and 0% which is within the acceptable threshold.
B
The lower than anticipated expenditures are related to the Albion Hills Conservation Area office and workshop replacement,
which has been deferred to Q4 2021 as a result of delays in planning and design. Once this is taken into consideration, the
variance is $519 and 9% which is within the acceptable threshold.
C
The lower than anticipated expenditures are due to delays in the detailed design for the Scarborough Waterfront Project,
resulting from various technical challenges presented as the process has advanced. TRCA continues to work with the City of
Toronto through project planning to move the design exercise forward and is in on-going discussions with City Finance and
Transportation regarding the confirmation of implementation funding. Once this is taken into consideration the variance is
(-22) and 0% which is within the acceptable threshold.
D
The lower than anticipated expenditures are due to delays for a number of contracted service trail infrastructure projects
including: The Meadoway, Lambton Woods Pedestrian Bridge Replacement and Moore -Heath Beltline Trail Switchback, which
are all anticipated to begin in Q3. Additionally, the scope of work for Cudmore Creek trail improvements has been reduced
due to funding constraints. Once this is taken into consideration the variance is $726 and 5% which is within the acceptable
threshold.
E
The lower than anticipated expenditures are due to the deferral of remaining site improvements at Bolton Camp until
sufficient funding is secured. Once this is taken into consideration the variance is $283 and 8% which is within the acceptable
threshold.
F
The lower than anticipated expenditures are due to the cancellation of in-person training programs and events as a result of
COVID-19. Once this is taken into consideration the variance is $428 and 8% which is within the acceptable threshold.
G
The lower than anticipated expenditures are due to staff gapping. Additionally, the Morningside Legacy project is anticipated
to be implemented in Q3 & Q4 of this year. Once this is taken into consideration the variance is $277 and 7% which is within
the acceptable threshold.
H
The lower than anticipated expenditures are related to the delivery and installation of mass timber at TRCA's new
administrative office building, which has been delayed to Q4. Once this is taken into consideration the variance is $1,801 and
4% which is within the acceptable threshold.
OPERATING REPORTABLE VARIANCE NOTES - EXPENDITURES (Figures in 000's)
The lower than anticipated expenditures are due to a reduced number of corporate offerings as a result of COVID-19. Once
this is taken into consideration the variance is $323 and 5% which is within the acceptable threshold.
RES.#B83/21 - 2021 COVID-19 SIX MONTH UPDATE
To provide an update to Toronto and Region Conservation Authority's
(TRCA) Board of Directors regarding the financial impacts of COVID-19 in
the first six months of 2021.
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT this 2021 COVID-19 Six Month Update report be received.
CARRIED
BACKGROUND
Since the commencement of COVID-19's impact on TRCA operations in March 2020, staff have
provided updates to the Board of Directors regarding the ongoing response to the pandemic in
the form of reports, memos, and presentations. These updates provide an overview of the
changing circumstances around the work environment, financial implications, and operational
restrictions that TRCA continues to face. The impact of COVID-19 on TRCA's operating budget
was successfully managed by staff throughout 2020 and into 2021, this can be directly
attributed to the hard work of staff across the organization to adapt ongoing programming to
meet the provincial directives.
Staff are now prepared to shift between adapted and in-person programming in response to
public health conditions.
RATIONALE
COVID-19 restrictions have continued to impact TRCA's business models and has resulted in
the cancellation of in-person events and programming in the first six months of 2021. A
summary of the province -wide restrictions impacting TRCA's operations can be found below:
Stage
Date
Province -wide Stay -at -Home order
December 2020 — June 11, 2021, with brief
periods of reopening in Durham & York regions
Step 1 of the Roadmap to Reopen
June 11, 2021 — June 29, 2021
Step 2 of the Roadmap to Reopen
June 30, 2021 —July 15, 2021
Step 3 of the Roadmap to Reopen
July 16, 2021 - Present
Roadmap Exit Step
To be determined
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 9 — Measure performance
FINANCIAL DETAILS
As noted in COVID-19 financial updates provided throughout 2020, TRCA's operating budget
and more specifically, authority generated revenue, is most heavily impacted by restrictions. To
examine the financial impacts of COVID-19 in the first six months of 2021, TRCA's operating
budget performance is compared to the same period of 2020 in Table 1 below:
Table 1 - TRCA Operating Budget Actual Six -Month Performance
2021
2020
Variance $
Expenditures 17,658,276
18,114,321
456,045
TRCA Generated Revenue 11,810,635
7,338,537
4,472,098
Deficiency of Revenue over Expenditures -5,847,641
-10,775,784
4,928,143
The deficiency of revenue over expenditures each year above is not a financial loss but
illustrates the portion of government funding in TRCA's operating budget. Government funding,
which is over 90% operating levy, increased from $16.8 million in 2020 to $17.8 million in 2021.
Operating Variance Explanation
In analyzing TRCA's Service Area performance over the six-month period, thresholds consistent
with those utilized to analyze TRCA's expenses to date in the 2021 Six Month Financial Report,
+/- 10% and $500,000, were applied to the organization's Service Areas. As shown in Table 2
below, the first six months of 2021 have generated a 61% increase in authority generated
revenue compared to the first six months of 2020.
Table 2 - Authority Generated Revenue (Actual Six -Month Performance)
Authority Generated Revenue
2021
2020
Variance $
Explanation
Watershed Planning & Reporting
-
-
259,712
62.3%
Water Risk Management
-
-
586,956
65.8%
Regional Biodiversity
1,479,554
892,598
586,956
A
Greenspace Securement and
Management
680,467
719,597
39,130
Tourism and Recreation
4,225,685
1,656,950
2,568,735
B
Planning and Development Review
4,067,028
3,384,604
682,424
C
Education and Outreach
1,069,756
483,607
586,148
D
Sustainable Communities
215,206
136,800
78,406
Corporate Services
72,939
64,380
8,560
Grand Total
11,810,635
7,338,537
4,472,098
The following explanations for the increased revenue are outlined below in Tables 3 - 6:
Table 3 - Regional Biodiversitv (Actual Six -Month Performance)
The 2021 increase in TRCA generated revenue noted in Table 3 above is comprised of tipping
fee revenue generated at the Brock North and Brock South sites. Once this is taken into
consideration the variance is within the acceptable threshold. Tipping fee revenue from Brock
North and Brock South has not been impacted by the COVID-19 pandemic, as essential
construction projects and services have remained operational during the Stay -at -Home order.
The revenue generated at these sites will offset all development and operating expenditures
and surplus revenue will be used for the future restoration of the Brock North lands and
Greenwood Conservation Area lands.
2021
2020
Variance ($)
Variance (%)
Expenditures
157,184
416,896
259,712
62.3%
TRCA Generated Revenue
1,479,554
892,598
586,956
65.8%
Excess of Revenue over
Expenditures
1,322,370
475,702
846,668
178.0%
The 2021 increase in TRCA generated revenue noted in Table 3 above is comprised of tipping
fee revenue generated at the Brock North and Brock South sites. Once this is taken into
consideration the variance is within the acceptable threshold. Tipping fee revenue from Brock
North and Brock South has not been impacted by the COVID-19 pandemic, as essential
construction projects and services have remained operational during the Stay -at -Home order.
The revenue generated at these sites will offset all development and operating expenditures
and surplus revenue will be used for the future restoration of the Brock North lands and
Greenwood Conservation Area lands.
Table 4 — Tourism & Recreation (Actual Six -Month Performance)
The 2021 increase in TRCA generated revenue noted in Table 4 above is due to additional
commercial filming revenue generated at TRCA Conservation Areas ($1.4 million). Once this is
taken into consideration the variance is within the acceptable threshold. This revenue will be
used to offset additional operating costs or COVID-19 related revenue losses. Any remaining
revenue may also support unique one-time expenses such as Gypsy moth spray at Boyd
Conservation Park, the installation of automated gates, or contribute to corporate reserves.
Table 5 - Planninq & Development (Actual Six -Month Performance)
2021
2020
Variance ($)
Variance (%)
Expenditures
3,215,684
3,155,525
60,160
1.9%
TRCA Generated Revenue
4,225,685
1,656,950
2,568,735
155.0%
Excess (Deficiency) of Revenue
over Expenditures
1,010,001
1,498,575
2,508,575
167.4%
The 2021 increase in TRCA generated revenue noted in Table 4 above is due to additional
commercial filming revenue generated at TRCA Conservation Areas ($1.4 million). Once this is
taken into consideration the variance is within the acceptable threshold. This revenue will be
used to offset additional operating costs or COVID-19 related revenue losses. Any remaining
revenue may also support unique one-time expenses such as Gypsy moth spray at Boyd
Conservation Park, the installation of automated gates, or contribute to corporate reserves.
Table 5 - Planninq & Development (Actual Six -Month Performance)
The 2021 increase in TRCA generated revenue noted in Table 5 above is due to an increase in
the number of development planning applications in 2021. Once this is taken into consideration
the variance is within the acceptable threshold.
Table 6 - Education & Outreach (Actual Six -Month Performance)
2021
2020
Variance ($)
Variance (%)
Expenditures
5,280,413
5,016,516
263,897
5.3%
TRCA Generated Revenue
4,067,028
3,384,604
682,424
20.2%
Deficiency of Revenue over
Expenditures
1,213,386
1,631,912
418,526
25.6%
The 2021 increase in TRCA generated revenue noted in Table 5 above is due to an increase in
the number of development planning applications in 2021. Once this is taken into consideration
the variance is within the acceptable threshold.
Table 6 - Education & Outreach (Actual Six -Month Performance)
The 2021 increase in TRCA generated revenue noted in Table 6 above is due to fees collected
at Black Creek Pioneer Village, Kortright, Swan Lake, Claremont, Tommy Thompson Park and
Claireville for summer camp bookings which were cancelled throughout 2020 due to COVID-19.
Once this is taken into consideration the variance is within the acceptable threshold.
DETAILS OF WORK TO BE DONE
TRCA's Human Resources team will continue to lead the monitoring of public health, legislative
changes and partner municipality practices to ensure TRCA is legislatively compliant and has
adopted the most current public health requirements and recommendations.
Staff will continue to offer virtual programming and are preparing to offer in-person programming
while conditions allow in the second half of the year. Additionally, staff are in discussions with
area school boards to begin to plan for a safe reintroduction of class field trips when appropriate
and public health conditions permit, with day field trips anticipated in late 2021 and overnight
excursions in 2022.
2021
2020
Variance ($)
Variance (%)
Expenditures
1,830,467
2,184,391
353,925
-16.2%
TRCA Generated Revenue
1,069,756
483,607
586,148
121.2%
Deficiency of Revenue over
Expenditures
760,711
1,700,784
940,073
-55.3%
The 2021 increase in TRCA generated revenue noted in Table 6 above is due to fees collected
at Black Creek Pioneer Village, Kortright, Swan Lake, Claremont, Tommy Thompson Park and
Claireville for summer camp bookings which were cancelled throughout 2020 due to COVID-19.
Once this is taken into consideration the variance is within the acceptable threshold.
DETAILS OF WORK TO BE DONE
TRCA's Human Resources team will continue to lead the monitoring of public health, legislative
changes and partner municipality practices to ensure TRCA is legislatively compliant and has
adopted the most current public health requirements and recommendations.
Staff will continue to offer virtual programming and are preparing to offer in-person programming
while conditions allow in the second half of the year. Additionally, staff are in discussions with
area school boards to begin to plan for a safe reintroduction of class field trips when appropriate
and public health conditions permit, with day field trips anticipated in late 2021 and overnight
excursions in 2022.
Staff will continue to monitor the financial health of the organization and investigate all
opportunities provided to mitigate financial losses.
Report prepared by: Jenifer Moravek, extension 5659
Emails: jenifer.moravek(&trca.ca
For Information contact: Michael Tolensky, extension 5965
Emails: michael.tolensky(abtrca.ca
Date: August 3, 2021
RES.#B84/21 - FUNDING AND GRANTS PROGRAM
In -Year Program Update to Toronto and Region Conservation Authority's
(TRCA) Board of Directors on the Funding and Grants program and to
highlight the success rate as of August 13, 2021.
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT the staff report highlighting the in -year Funding and
Grants program update for 2021, be received.
CARRIED
BACKGROUND
The Funding and Grants program within the Strategic Business Planning and Performance
business unit provides timely and seamless support for all TRCA and Toronto and Region
Conservation Foundation (TRCF) funding and grant applications. This program provides
opportunities for TRCA programs and services to diversify their revenue streams through
additional support provided through the centralized funding and grants team. The funding and
grants team also assists in strengthening the leadership and collaboration among all divisions
to ensure consensus in the prioritization and strategic positioning of all new funding
opportunities.
RATIONALE
Attachment 1 provides a summary of the status of funding applications submitted as of
August 13, 2021, which are organized based on their current status of approved, under review,
and declined grants. The attachment is current as of August 13, 2021.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategies set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 7 — Build partnerships and new business models
Strategy 9 — Measure performance
FINANCIAL DETAILS
Between January 2021 and August 13, 2021, the Funding and Grants program has facilitated
a total of 48 grant submissions with a total in -year request of $12.1 M. The additional revenues
and support generated through the funding and grants program help to provide projects and
programs with an increasingly sustainable business model by reducing reliance on partner
municipality funding.
TRCA currently has approximately $7.4M in grant applications under review with various
funding programs following grant applications that were submitted in the current fiscal year.
Throughout 2021 to date, TRCA received notice that $3.7M has been awarded through the
Funding and Grants program, and that $8.3M has been declined.
Table 1: In -Year Grant Program Update
Grant Status # of Grants
Approved/Requested
Funding
$ 000's
Under Review Grants 19
$7,376
Awarded Grants 30
$3,741
Declined Grants 13
$8,306
In addition to the funding applications submitted and/or awarded in the current fiscal year,
TRCA continues to manage grants and funding that have been successful in previous fiscal
years and were still active in 2021. TRCA has budgeted a total of $21.OM in revenues for
2021, which is representative of all sources of grant funding.
As of August 13, 2021, TRCA had earned 21% of the budgeted grant revenue for 2021. The
percentage of revenue earned appears low as a result of the timing of invoicing for the
Disaster Mitigation and Adaptation Fund (DMAF). TRCA staff are working closely with program
officers throughout this process and will continue to report on the status of these projects.
Additionally, COVID-19 restrictions have delayed implementation of the Administrative Head
Office Building project and thus payments from Natural Resources Canada for TRCA's
GCWood grant have been deferred.
The following section highlights some of the major projects and programs that make up the
budgeted total for each revenue category:
Federal
Toronto Region Ravine Erosion Management and Hazard Mitigation Project and Waterfront
Erosion Hazard Mitigation Project— With funding from the Government of Canada's DMAF
program, these projects continue to be implemented to address erosion issues within TRCA's
jurisdiction. The projects address erosion along ravine systems in the Region of Peel, York
Region and the City of Toronto, as well as maintaining and restoring TRCA's extensive
network of shoreline erosion control structures over the next 7 years.
The Newcomer Youth Green Economy Project (NYGEP) — With funding from Immigration,
Refugees and Citizenship Canada, NYGEP supports newcomer youth interested in careers in
the environmental sector by providing access to experiential learning opportunities and job
skills training. Despite challenges posed by restrictions to in-person learning, staff have
mobilized virtual alternatives to ensure NYGEP's continuous and successful implementation.
TRCA's New Administrative Office Building — With funding from Natural Resources Canada's
Green Construction through Wood (GCWood) Program, TRCA is constructing a new mass
timber head office building which promises to be one of the most energy-efficient office
buildings in North America once completed.
Provincial
Professional Access Into Employment (PATE) Program — With a funding extension from the
Ontario Ministry of Labour, Training and Skills Development, the PAIE Program will continue to
help internationally trained environmental engineers, geoscientists, planners, ecologists and
green building specialists to obtain commensurate employed in Ontario into Fall 2021. A
proposal has been submitted to the Ministry to further extend PAIE implementation until 2024.
Municipal
Toronto Tree Cover Project — The Toronto Tree Cover Project has engaged communities
throughout Toronto in support of the development and expansion of native tree cover on
commercial, industrial and institutional lands throughout the city for over three years.
Non -Government
The Meadoway— With funding from the Weston Family Foundation, Environment and Climate
Change Canada, and City of Toronto, detailed design work is currently being completed for The
Meadoway trail network, as well as extensive meadow restoration and outreach and education
programs to engage and inform members of the surrounding community.
The funding and grants program continues to support the establishment and success of
sustainable business models through collaboration with partners and the pursuit of diversified
revenue streams which directs additional resources towards key initiatives.
DETAILS OF WORK TO BE DONE
Various aspects of the Funding and Grants Program continue to be affected by the COVID-19
pandemic. The Funding and Grants team will continue to work closely with TRCA's funding
partners to ensure that grant application submissions and reporting are submitted in a timely
manner, despite delays and implementation changes caused by public health restrictions. The
Funding and Grants team will also continue to work with TRCA's partners to adjust to our
shared circumstances.
The Disaster Mitigation and Adaptation Fund (DMAF) has re -opened and will be accepting
applications to its small-scale stream (projects with budgets between $1 M and $20M) and large-
scale stream (projects with budgets greater than $20M). The Funding and Grants team is
exploring this new intake by collaborating with TRCA staff and municipal partners to identify
eligible projects, secure matching dollars and develop strong funding proposals. DMAF already
provides significant support for TRCA's core natural hazard programs, and the Funding and
Grants team anticipates a concerted effort to extend this support through collaborative
applications — including both partner -led and TRCA-led initiatives.
Report prepared by: Kimberly Krawczyk, extension 5862
Emails: kim.krawczvk(&trca.ca
For Information contact: Jenifer Moravek, extension 5659
Emails: jenifer.moravek(&trca.ca
Date: August 19, 2020
Attachments: 1
Attachment 1: 2021 In -Year Grant Program Update
Abashment 1: Yeal G9m PNgr update
Funtling BotlY
Funding Ingrank5h man
Projacl TNa
Projec[ SfeNa
AAI.... I
RegueaYtl
Amount(f000'q
Greft Gntlwr Randow
Cary ofTomnlc
Community Plaaing he Stervardship Grein
Toronto This, Cover Project
Under Review
t00
Envnonmenl and Cfinels, Change Canada
lecomi
Try Meadows, Educalion and Community Reslwetion
Under Review
100
Envlronmea antl Climate Change Canada
EcvPAbn
Working with fowl Communities b lamed. Freshwabr Management
UnderRMew
100
Envkammea and Climate Change Canada
Nature Smart Climate Solutions Fund
Canada COmale Change Sdullons
Under Review
167
Enchantment BM Chmam Change Canada
Net— Steed Cl.. Soleal Fund
The scandal Re...n
Urger Re
1,948
Empbymerd and SOGal Development Canada
Ending Acwaski Fund
Nashalls Conversation Ryame ArrawldeThat and Pal Area
Under Revlery
564
Federal EsmmicAgency for So. Cntano
Canada Community Revilalinlbn FUM
The lmpmrement of Alcon this Condensation Pall VVwh ns
Under Review
AM
FMarel Ecorome cevelcpment Agency ler... OMBad
Canada Cdnmunq Rev Wwdkn Fund
The RNro8l 0 AMcne FIX Remembered T2lk
Under Review
1g8
Facetal Econme Oeveldpnrea Agency for Southam Onbdo
Canada Community Rededication Fund
The CanaWGim olTown M CNedon Ballon Camp Site Enbanw
Unbar Rai
750
Federal Economic Development Agency kr Southern OnhM
Canada Community Readdaliatem FUM
TM Con¢WGlmi A YOM Regan Multi -Use Tail
Unear Review
236
Fedand Eoammk Mveromr—1 Agency bf Southam Onda.
Canada Community Rommel FUM
The Re1m81 on Peaicom Creek Workshop and Mainistrem Centre
Under dwsdw
815
Mlnldry of Me Emlronmll. Cornwall and Parke
Great Lakes Prcgrem
Ikkarling Lowl Fantasy and Sources Affack, Stream Chloridedn
Chloride
Cmic-LathamM He TemnW wild an
Unw
Rwle
40
M'mktry of Into SeasonalConservation and Parks
Gnat Lakes Progmen
HigFinadulion Temporal Chloride Pathema and Cminbution M1om
Umammd watamheda
Unear Rs,vuw
73
lipall of Pe Errynsiona L Cnraervalim end PBMa
Great Laked poral
Rurel Clean Water Pmgrem
Under Re—
40
MNINry a Herbal Sped. Twdah and Culture
Handmade FWlval and Event PwmAd
SugartuaM1 MryAe Sylup F.I.1
UrvNr Redew
151
MNieary cf Lader, Trading and Skill¢ Seasonal
Ongde Bad, Tamung Pegram
PediSng A. ams. anis, Empbymet(PAIE)
UnderR—
2,225
MMlaey of N.. Reaowceand Forestly
SpeCea at Mck SMumdshlp PW
Impmdng Mon.i des, l N MCMeadoway through Onlreach and
Extended
Underpsynew
SO
Ismidry M NeWml.—.. and FmedBy
Sweden at Rick Rockwell Pmgmn
Tommy Tlnompdm Perk Phremses. Menagemea
Underdshow
1W
Pu the Health Agency of Canada
blhm Mi ANm Fund
Growing Isouhy Towal Transferal Padnen for a Heartlry y fa
Env mea
Under Revlaw
1.
Subtotal Unser Review Gaal
f T.37B
Awad oG
Rai EnvimomenmlFoundalld
Bdrovllle EnvlronmenlN Fwndalld
Jafleaon,bman antl Jurf Parks
-
AwaNab
200
Employment and Social Development Canada
Canada Summa J.
TRCA Canada Summer Jobs 2021
Awful
7R
Envlmnmenl antl Climate Chang. Canada
Great Lakes Proleclion lmmi
Evaluating Flshenw in the Toronto and Region Area of Conwm using
Asoustic Telemeey
Awarded
107
Envlmnmenl and Climate Change Canada
Great Lakes whime9an lnNativa
Rata Bpi' Retlorader,"ad
Assumed
TS
Envlronmakd and Climab Change Canada
Grout Lake. Pleaded- unit
WiIQde Habitat Federman in the Cantel Toronto WaadmM
Awarded
203
Envlronmea and Climab Change Canada
Habibl Stewardship Program QamoNp
Chill Comnwlbn Area Welland C.nneGWity Prged
Awarded
21
Environment and Climate Change Canada
Habial 5eawam.hip Program (Terri
The Meadows, POYinbr Habitat for bbweM
Awarded
75
Envlronmonl and Climate Change Cantle
Habitat 5t—haddrip Progmm(Terna l)
TM AN Project Supposing Miami Mimi Milkweed and
herrn mg through OWread
A.Wait
BB
maherma and Mon Canada
ASKn Carp Monlbdng Rogam
I'll Asian Carp Mdial Paul
Awarded
102
Food Banks Canada
Emeryency Food Security Fund
Food Service Poviaion for Vulnerable Carcina ea
Awarded
1;
Fired Oaado
Cawlantl BbwamsMp Inillerad,
The MwdOway: Meadow Real dNd ProNG
Assumed
40
Hannam, Canada
CelsbMa Canada
Used a a Teacher Oe Weng
Awamad
20
Hadbga Canada
Ywng Canatla Wodu
AThaeokgy FbM Staff
Awarded
17
InM1asWdure Canada
Inanling In Canada lnhaslmdure Program III
CarruNea Crack Welmnd
Awll
500
Infrastructure Canada
Newel Diamond, Mitillmon partial (141
rill SM1orefa Haan Mapping Ull
Adhowd
415
nhadral Cenaba
Nalidal Ul.,M8igetion Progam(NDMP)
JudWlCdonalSpillB aressamea- Flood Pain Mapping Etldagn
Amended
135
Ministry of Ne Environment, Conservation and Parka
Great Lakes I Action Fund
Toronto Inner Hmbour Fbabbka Straedy
Awaited
51
Ministry of Ne Envimnmenl. Conaarvalion and Parka
Great Lakes Pragam
RUM Clean Water Promand
Awaited
40
Ministry of Me Envimnmenl Conservation and Parke
Great Laked Progrem
Ajax Simon Sewer Phosphorous MoniWIng
Assumed
21
Ministry of Heritage, Sped. Tel and Cause
Rewnnad Festival aW Event Pragnm
Maglwl CM1daMaa Forest at KONighl
Awarded
A
Ministry of Natual Hamurws ane Forestry
W. ad Emaion Coal lnhnedua Gall
TRCA Prgeds
Awarded
565
Ovaria AGlve School Thal
Oaarla AGiva SCM1ool Tavel Fund
CAST Bampin
Awarded
a
Label Aleve School Trevel
Onbrm Adlve SCMG Tavel FUM
OAST Caked.
Awareed
2G
dirtiest LwrMn9 Tram
Susan JOba
TRCA G., Jab.
Auvewd
34
Region of Peel
Sol $aniae Rdlel Funding
Food Service Promion for Vulneade Carramoes
Awarded
56
TC Emrgy
WIItl Strong Fund
Has CdaervaGan Rmerve Management Fmgram
Asserted
5
M Fraena Of M¢ Environment Founder.,
MFriends Of the Environmanl Council Grant
And. Tbnspomallon Pmgamnhmi Midadad". Stool
Assumed
10
TD Fd.nba Of he Enfirnnead Foundation
MFuldi Of the Environmanl Foundation Gwd
Ruder Can TCO; BUIldirg an Envimnmenl for Change
Awarded
7
TD F ... us Of the Environment Foundation
TO Friends of Environmad Foundation Grant
TMMpnazch Way Pealed
Awarded
14
Tena Canada
Ne"m Greening Pmgam
Block Sou"Tres "mag
Awamad
21
Subldal- Awarded Gnnb
S 1,141
Deal. wed.
Fall combs,
Las Talk Community FromLars
Walk FomerTheapy In and GTA
owil
14
Community F-mationsof Canada
Canada Hwkhy Canmo...a mplitlVa
Imwhadw Community Acwsa l doccal Programming at Lake St
George
Di
103
Communt, Funntlafrons of Canaden
'm... Healthy Communiurkmads,
lineamental A COVID through Grean lnhaa4uctme Ravltall....
had.
151
Ens-mam and Climate Change Canada
Ens --anal Dam ages Fund
Climate Change Champions
Declined
4.166
EnvMomment and Climate Change Canada
Climate anon and Awarena¢s Fund
Building Climate Leadership in VeinalNeighbcuhoods
Decbnad
3.976
Friends of the Greenbelt Foundation
Redlienl Grail Fund
Planting a FUWra Forest A Ill South
Declined
136
Friends of the Greenbelt Foundation
Radian[ Greenbelt Fund
Emmeline Creek Valley Community Resloraton Plot.
Decfrand
41
Had.One
Hydro One Community Fund
Creeping a Sak aM Welo min, Neighbourhood 0rough Community
Inbreection lmprova.
Dadlired
34
I Mresbucture Canada
Naosed Disaster Miligapim Program (NDMP)
Etabiwke Creek Hydrobgy Update and$brmwater Management CMena DeGired
Ass. mem
150
lismi ylor Seniors and Axeaubiupv
Inuluswe Commi Gram
Gifted Senid. Community Bnemrg Pryaci
Nut.
60
Tormro AMo¢phenc Fund
To.. AMo¢phenc Fund
Evaluation of Le -Carbon Building Energy Technoll
DaGined
344
Wildne Handed Canada
Spam, lnitietire
Ph yndes Management at Tommy Thompson Part,
Deasi.
40
WiNlila Habitat Canada
Comment, Con¢eroton Apon Fluor—
Game Can Top'. Tommy Tomym Paris
Dehaved
10
subtotal Named GnMe
S
9.306
RES.#685/21 - 2021 RISK PROGRAM UPDATE
Update on Toronto and Region Conservation Authority's (TRCA) Risk
Management Program.
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT this report on TRCA's Risk Management Program be
received.
CARRIED
BACKGROUND
At Board of Directors Meeting #6/19, held on June 21, 2019, Resolution #A124/19 was
approved as follows:
THAT TRCA's Risk Management Policy (the Policy) be approved and take effect upon
approval by the Board of Directors,-
The
irectors;
The Policy provides the following guidance on the issue of risk:
• The mandate to manage the issue of risk;
• A common language around the issue of risk;
• Roles and responsibilities on the management of risk;
• A process for the management of risk;
• Principles on how the organization should address risk;
• Guidance on what level of risk is acceptable to the organization and how it should be
• managed; and
• A requirement to report annually on the status of TRCA's Risk Program
RATIONALE
TRCA's Risk Program ("Program") includes traditional aspects of loss, incident and insurance
management activities, health and safety assessments, contract management activities,
business planning components and flood and erosion risk service programs. TRCA's adoption
of the Policy introduced additional enterprise risk management concepts into TRCA's risk
management practice and is being guided broadly by ISO 31000:2009 Risk Management
Principles and Guidelines.
More specific risk management guidance is offered by TRCA's Risk Committee ("Committee")
which consists of:
• Chief Financial and Operating Officer (Chair);
• Associate Director, Property and Risk Management;
• Legal Counsel;
• Advisor, Risk Management;
• Controller; and
• Other subject matter experts as necessary to support the work of the Committee.
The Committee's work is focused primarily on providing direction to the Risk Management
Program, prioritizing action to manage risk and acts as a formal risk assessment group for the
organization. The day-to-day management of various risk issues is, however an enterprise -wide
effort supported by the diligent contribution of staff across the entire organization. This work is
facilitated by a variety of systems including TRCA's incident reporting, procurement and claims
management databases. The Centralized Planning and Reporting Database, safety checks,
hazard assessments, incident plans, claims processes, incident response teams and many
other operations are also important parts of the enterprise -wide risk management system.
Some highlights of corporate efforts to strengthen TRCA's risk resilience in 2020 included
COVID-19 Response
COVID-19 has presented one of the most ongoing and challenging operational working
environments in decades. Despite these challenges, under the continued guidance of the Senior
Leadership Team Pandemic Response Committee TRCA maintained healthy business
continuity in permitted areas of business, through a suite of previously reported expenditure
reductions and ongoing efforts of staff to adapt ongoing programming to meet provincial and
public health directives.
Incident and Contingency Planning
In an ongoing effort to improve TRCA's incident management practice, staff streamlined incident
reporting and emergency management information by centralizing all incident reporting through
a centralized incident reporting portal accessible to all staff. To further guide the use of all
incident planning, reporting activities, TRCA developed the Incident and Contingency Planning
Guideline. The Guideline was developed in support of all existing corporate incident response
tools and to provide additional information to support a recently launched corporate wide
incident and emergency response training for all staff. Working within the existing framework,
corporate facility managers and select program managers also undertook the significant effort of
updating contingency plans for over 16 core services across the organization as well as
Emergency Action Plans for each of TRCA's 22 facilities. Future efforts are aimed at further
centralizing emergency and incident planning efforts as well as life -safety planning efforts under
the direction of the corporate Asset Management Program.
Claims Management
2020 saw a drastic reduction in the number of incidents reported by staff. Year over year
TRCA's incident experience saw a 58% reduction in the number of incidents reported to 66 from
Jan 2020 to Jan 2021. To date, TRCA is tracking 28 total claims attributable to the same time
period. Proportionally, this represents 42% of all reported incidents and an increase of 17% year
to year. The decrease in reported incidents is largely explained by the reduction in many of
TRCA's operations, including programs in the Tourism and Recreation and Education Outreach
service areas as a result of COVID-19. Together these service areas contribute to the majority
of TRCA's incident reports. The proportional increase in claims is largely attributable to an
increase in Auto and Equipment incidents in 2020, and in particular at -fault incidents. Other
areas of risk remained largely proportional year over year. Areas for improvement in incident
and claims response are currently being evaluated in support of TRCA's Certificate of
Recognition certification efforts.
V 61:4 [OPj 011910:I_la1l;J Z11 lei V ISI *�
TRCA continually reviews risk exposures including vulnerabilities that face the organization.
Reviews are undertaken through the Committee and are based on best available information
including incident reports, loss data, staff interviews, industry data and global risk reports. These
activities regularly identify areas for action as well as other opportunities to improve
preparedness to certain exposures. Some of the ongoing priorities include:
Incident and Claims Management
While the centralization of TRCA's incident reporting systems into a single incident reporting
portal represents a significant improvement in managing incidents and claims throughout the
organization, the system continues to rely on dated technology. The development of a single
comprehensive incident reporting and claims management system remains an ongoing unmet
need and risk management program priority
Fleet and Equipment Risk
Preliminary areas for improvement in the area of fleet risk include streamlining of policy, annual
training of staff authorized to operate fleet, remedial training for staff involved in at -fault
accidents, the implementation of annual abstract reviews and development of corporate claims
and incident performance targets. These efforts are ongoing areas for improvement and are
being led by Fleet Services.
Land Classifications and Service Standards
TRCA's recent corporate realignment has led to many opportunities for operational efficiencies.
While staff continue to diligently manage corporate assets, the realignment offers an opportunity
to streamline and standardize these ongoing land management activities with an aim to reduce
service time, and improve communications both internally and externally on TRCA's corporate
land management status.
Risk Education Program
An ongoing goal of the Risk Program is to increase the corporate knowledge base on issues of
risk and risk management. While numerous guides on traditional risk issues have been
developed and posted on corporate intranet services. The recent successes of the Learning and
Development Team's in implementing a corporate Learning Management System offers an
opportunity to leverage corporate knowledge tools to boost staff familiarity on risk management
concepts, contract administration, construction, insurance, surety management and other
related topics.
Cost of Risk
TRCA's primary means of financing risk is via insurance. Global premium rates continue to
escalate at a concerning rate. An ongoing goal of the risk program is to monitor and maintain
renewal rates within market rates. TRCA continues to work with the Conservation Ontario
Insurance Benefits Committee as well as it's brokers to monitor market conditions and to review
how it structures coverage to ensure TRCA maximizes the value it receives on premium dollars
spent.
In addition to these priority areas, TRCA is actively addressing exposures to other risks by
regularly reviewing its business practices and making improvements to the way TRCA does its
business.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 3 — Rethink greenspace to maximize its value
DETAILS OF WORK TO BE DONE
In addition to the items previously described in the report, the Committee will continue to review
opportunities to improve TRCA's risk management framework, as well as opportunities to
integrate risk management practices into existing corporate practices.
Report prepared by: Adam Szaflarski, extension 5596
Emails: adam.szaflarski(aatrca.ca
For Information contact: Adam Szaflarski, extension 5596
Emails: adam.szaflarski(aD_trca.ca
Date: August 27, 2021
RES.#B86/21 - Q2 2021 COMMUNICATIONS SUMMARY
Information report regarding Toronto and Region Conservation Authority's
(TRCA) corporate media communication activities during the second
quarter of 2021. (April 1 — June 30)
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT the Q2 2021 Communications Summary report be received.
CARRIED
BACKGROUND
The Communications, Marketing and Events business unit, with involvement of program areas
across TRCA's Divisions, carries out corporate communications programs to provide TRCA with
a unified voice that aligns consistently with strategic priorities, and monitors results to identify
opportunities for improvements. Working with staff from all divisions and external program and
service providers, the business units deliver communications campaigns through traditional
media outlets and online social media channels. Content is typically disseminated through
materials such as news releases and media advisories, direct outreach to targeted journalists,
producers and editors, and responses to incoming media inquiries. Digital campaigns involve
posting of visual and written content on websites and distribution via social media platforms. All
media activity is supported by ongoing assessment and deployment of technology tools and
processes to maximize effectiveness.
Compared to the unusually high amount of media coverage in Q1 as a result of the public
discourse around Minister's Zoning Orders (MZO), there was a decrease in overall media
coverage in Q2. This is in line with TRCA media outreach objectives to share scientific
environmental knowledge as well as create meaningful interest in the on -the -ground work that
TRCA continues to advance within our watersheds.
Additionally, this quarter saw the growth of ongoing coverage about TRCA's new administrative
office, opening in late 2022.
Both the traditional media and social media traction received in Q2 is an indication that our
audiences are engaged and listening to TRCA's point of view and TRCA is putting out
communications that provide insight and interest to its audiences.
The report provided in Attachment 1 focuses on notable communications activities, media
coverage and relevant social media activity during the reporting period.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 6 — Tell the story of the Toronto region
DETAILS OF WORK TO BE DONE
TRCA is preparing a Communications Plan to ensure more streamlined and strategically
focused media relations that will guide our approach in working with media, which will be
brought forward in October to the Board of Directors.
TRCA is creating media relations documents and holding education sessions with staff to better
prepare staff to speak to media in a consistent manner with accurate messaging.
TRCA continues to engage media outlets on stories that are unique to the organization and its
mandate.
Report prepared by: Sinem Connor, extension 5401
Emails: sinem.connor(aD_trca.ca
For Information contact: Clare Graham, 416-953-8567
Emails: clare.graham(a)trca.ca
Date: September 1, 2021
Attachments: 1
Attachment 1: Notable TRCA Media Coverage & Social Media Activity: April 1 — June 30, 2021
Attachment 1— Q2 Communications Reporting to BOD
Report Overview
This report covers communications and marketing activities for TRCA between April 1, 2021—June 31,
2021, achieved by Communications, Marketing and Events (CME) Team.
Q2 Successes
1. CME team continued to respond, adapt and update TRCA digital assets in a timely manner to
keep up with the latest COVID-19 health guidelines and mandates.
2. Bike the Creek, the virtual biking event in partnership with City of Brampton took place between
June 9 - 30 was a great success with 590 registered participants.
3. For Earth Day, April 22, CME staff successfully launched the Watershed and Ecosystem Hub, a
new site designed to allow users to interactively explore information about watersheds and the
waterfront in the Toronto region.
4. Successful execution/promotion of TRCA Summer Camps via social media and online advertising
between April 1— May 31 resulted in 95% of spots being filled.
5. Between April 1 and June 30, a marketing campaign for Maple Syrup online store was set up to
move leftover stock from the cancelled 2020/2021 Maple Syrup festivals. The campaign
included newsletters, display ads and social media, resulting in over 1,000 items sold.
Key Q2 Communications Metrics
1. In Q2 there were a total of 58 campaigns/newsletter issues with an average open rate of 44%
and click rate of 8.21%.
2. Social media audience growth rate was 5%.
3. Social media audience engagement was up by 67% with a total of 51,039 interactions. This was
the result of boosted Facebook ads as well as social media advertising for TRCA summer
campaigns.
4. TRCA.ca website page visits grew by 34% as a result of those same summer marketing
campaigns.
02 Social Activity
During Q2 2021, social media content focused mainly on wildlife species, tree planting, fisheries, parks,
and outdoor recreation.
Two campaigns of note included Bike the Creek, which received over 950 engagement actions (likes,
comments, and shares) and a photo contest for a park pass that received over 575 engagement actions.
Best Performing Social Media Posts:
Q0 Toronto and Region ConeereatL..
W, 4/1212021 6:17 — PDT
Invasive sea lamprey are starting to move up
Me Humber River & Duffins Creek to spawn,
and Fisheries and Demme Canada & TRCt
Total Engagements
1,392
Reactions
.....................
201
cpmmemc
e2
Shams
59
Pos
77
I� 9 TRCA—HQ
ah Fd 5/14/2021212 pm UTC
Q2
Did You Know: The winner of Big
Brother Canada is a TRCA
employee7l We congratulate
@tychonbbcan9 on outlasting his
housemates and are proud to see
him use his platform to amplify the
importance of representation:
bit.lyi3ohNVHp
Total Engagements
819
Likes
76
@Replies
3
Retweets
a
Post Link. Clicks
77
Other Post Clicks
ass
O[her Engagements
0
T QO tma_hq
Thu 4/22120215:30 am PDT
This #EarthDay TRCA is proud to announce its
newest land acquisition for Albion His
Conservation Park! This is the first major
Total Engagements 265
TA ® Toronto and Region Conservati...
Tue 6/29/2021 8:57 pm UTC
It is wonderful to have our municipal partners
come to visit our sites. Yesterday, Kealy
Dedman, Peet Region Commissioner of PI.
Total Engagements
1,955
Reactions 110
11
Comments 2
Shares 3
Post Clicks (All) 1,840
Media Coverage
Summary
Compared to the unusually high amount of media coverage in Q1 as a result of the public discourse
around MZOs, there was a predictable slight decrease in overall media coverage in Q2. The topics of
coverage returned to TRCA's normal themes after a more politically charged Q1. This is in line with TRCA
media outreach objectives to share scientific environmental knowledge as well as create meaningful
interest in the on -the -ground work that TRCA continues to work within our watersheds. The media
coverage we saw in Q2 was neutral and positive.
Additionally, this quarter saw the start of what will likely be ongoing coverage about the exciting new
administration building. Specifically, the two topics that received the most coverage this quarter were:
1. TRCA New HQ building and the wood material used for its structure got a lot of media
attention in Q2. The articles all had a common thread which is that the new TRCA HQ sets
the standards for sustainable new development. The coverage was very positive and created
excellent brand exposure.
2. Through our metrics measuring and tracking, we have found that TRCA Flood statements
have a wide reach as we have seen Toronto.com, Canlndia News, Daily Hive, CBC pick up on
our statements. *Flood Notices are not included in the summary below as they are
reproduced exactly from TRCA content.*
TRCA New HQ:
June 3, 2021 InHabitat by Dawn Hammon- Toronto Region Conservation Authority's net -zero office
building (inhabitat.com)
May 21, 2021— RemiNetwork.com - Biophilic design of new TRCA HQ puts wood first - REMI Network
May 18, 2021— Construction Canada - ZAS unveils wood -based, net -zero carbon design for new TRCA
HQ - Construction Canada
May 14, 2021—The Architect's Newspaper ZAS Architects reveals new mass timber headquarters for
Toronto's top natural resource conservation agency (archpaper.com)
May 14, 2021— Canadian Architect ZAS Unveils Wood -Based, Net Zero Carbon design for TRCA's new
headquarters (canadianarchitect.com)
May 14, 2021— BlogTo by Filipe Dimas Toronto is getting a breathtaking new wood building next to a
ravine (blogto.com)
Community and Watersheds:
June 16, 2021—Toronto Star by Noor Javed and Steve Buist Feeling heat on MZOs, Ford governmentsays
it will add 6,000 acres to Ontario's Greenbelt 1 The Star
May 5, 2021— Daily Commercial News by Dan O'Reilly Bolton, Ont. berm proiect a 'delicate operation':
TRCA - constructconnect.com
April 23, 2021— Brampton Guardian by Clarrie Feinstein Brampton residents fight to preserve Claireville
conservation from new trail (bramptonguardian.com)
April 13, 2021—The Globe and Mail by Dave LeBlanc Toronto pavilion serves as urban park's new front
door - The Globe and Mail
April 6, 2021— CBC by Michael Smee Councillors want place where mourners can spread funeral ashes
on waterfront I CBC News
Wildlife and Ecosystem:
June 3, 2021— Toronto Star by Celina Gallardo Nesting red -winged blackbirds are dive bombing people in
Toronto again 1 The Star
May 31, 2021— BlogTO by Olivia Little This Toronto park is home to the first of what will soon be two
billion trees (blogto.com)
May 23, 2021— Toronto Star by Celina Gallardo The search for the great North American river otter:
Inside one Toronto man's pandemic mission to find the elusive mammal I The Star
May 7, 2021— Caledon Enterprise by Karen Martin -Robbins What's going on here? TRCA planning aerial
spraying in Caledon, Brampton, Woodbridge, Stouffville (caledonenterprise.com)
Other:
June 29, 2021—Toronto.com by Joanna Lavoie Severe thunderstorm knocks down trees, floods roads
throughout Toronto I Toronto.com
June 12, 2021— CBC.ca by Muriel Draaisma Fence in park to keep people from climbing on Scarborough
Bluffs not'done deal,' councillor says I CBC News
May 19 — Beach Metro — by Martin Bryan Concerns raised over impacts of movie shoots, large crowds on
Leslie Street Spit's urban wilderness— Beach Metro Community News
Q2 Key Learnings and Next Steps
1. Video Content: In Q2 CME saw an increase of engagement with video content that related to the
ecosystem services TRCA provides as well as ones that highlight wildlife. CME will build on this
momentum and create exciting digital content to share amongst TRCA audiences. To this end,
CME will commence seeking vendors of record for videography services to help further enhance
TRCA's video content across all channels.
2. Newsletter Strategy: In Q2, there was a slight decrease in open rates for TRCA newsletters. This
is likely attributed to the wide number of newsletters that are issued across the organization. In
response to this, CME is developing a newsletter strategy to provide more relevant content to
subscribers which will bring down the number of newsletters our subscribers will receive but
increase the types of relevant content for each unique audience groups.
3. Internal Business Writing Support: CME saw an increase in inquiries to the team regarding
support and guidance on business writing. In our continued effort to create a consistent brand
across all channels, including internal direct communications between staff, CME will be working
with the HR department to create training and business writing templates. This will enable all
TRCA communications to be consistent, clear and effective in messaging when engaging with
the various TRCA audiences.
4. Social Media Audience: In Q2, audience growth was solid and there was a consistent increase
compared to Q1. Based on our metrics, CME saw a boost in TRCA audience growth that can be
attributed to tagging partners and leveraging their social networks. To continue this upward
trend, CME is creating a formal outreach plan to partner marketing and communications
departments to cross promote relevant content.
Look Ahead
Below is a list of upcoming communications activities set for the upcoming months:
1. Member recruitment campaigns for the following Education and Training programs:
Professional Access into Employment (PATE), Newcomer Youth Green Economy Project (NYGEP),
and Environmental Leaders of Tomorrow. These campaigns will be great opportunities for the
BOD to share available environmental programming with their constituents furthering TRCA's
reach to all communities within its jurisdiction.
2. In Q2, and continuing into Q4, CME will start the communications activities for the Partners in
Project Green (PPG) membership re -structure. Working with the PPG team the campaign will
include partner/member outreach, social media, traditional media and newsletter content
development. The communications efforts will further the PPG objective to increase revenue
through refined membership offerings and levels.
3. CME will be running a virtual campaign for Salmon Festival in mid-September for the month-
long event that will start on September 29. The communications activities will include the launch
of an interactive storymap for participants to report on salmon sightings; social media
campaign; and video production to help tell the significant ecological story of salmon travelling
through the Toronto region waters.
4. In Q4, TRCA Communications will be working cross -functionally with divisions to implement a
new email marketing and newsletter strategy to increase cross promotion and marketing
opportunities, improve user experience, and enhance brand consistency. Over the fall the team
will consult, test, and restructure the digital infrastructure of our current email system to
prepare for a January 2022 launch of our new email strategy.
RES.#B87/21 - UPDATE ON APPROVED DELEGATED MAJOR PERMITS
TRCA staff are required to report back on any major permits issued
through the approved delegated process during the months of July and
August 2021.
Moved by: Jack Heath
Seconded by: Linda Jackson
IT IS RECOMMENDED THAT the staff report regarding the staff issuance of major
delegated permits during the period of July and August 2021, be received.
CARRIED
BACKGROUND
At Board of Directors Meeting #8/20, held on November 20, 2020, Resolution #A183/20 was
approved as follows:
THAT the approval of all major development and infrastructure permits within TRCA's
regulatoryjurisdiction for the months of December 2020 and July, August and December
2021 be delegated to the Director, Development and Engineering Services or their
designate;
THAT TRCA staff provide a report to the Executive Committee at the January and
September 2021 and January 2022 meetings to summarize permits that were approved
under this delegation of authority,
RATIONALE
During the months of July and August 2021, staff issued no major development permits and one
major infrastructure permit within TRCA's regulatory jurisdiction, as follows:
A permit was issued for the reconstruction of the Lake Shore Boulevard bridge located
over the mouth of the Don River, widening of Lake Shore Boulevard from the Don
Roadway to Carlaw Avenue, relocation of the existing rail spur line, removal of the
Gardiner Logan ramps and construction of the associated public realm (bi-directional
protected cycling lanes, generous sidewalks with landscaping and planted buffers and
pocket parks/social seating areas), in the City of Toronto. These are enabling works
associated with the redevelopment of the Toronto Port Lands Flood Protection and Don
Mouth Naturalization project and the Gardiner Expressway and Lake Shore Boulevard
Reconfiguration work.
As required, the Clerk provided a copy of the attached permit report to Board of Directors
members in the representing the affected area for a review period of one week. No comments
were received from members. Permit C-211035 was issued on September 2, 2021.
Relationship to Building the Living City, the TRCA 2013-2022 Strategic Plan
This report supports the following strategy set forth in the TRCA 2013-2022 Strategic Plan:
Strategy 4 — Create complete communities that integrate nature and the built
environment
FINANCIAL DETAILS
Funding for the review of Waterfront Toronto permit applications is made available through an
existing delivery agreement between Waterfront Toronto and TRCA which is in effect until
December 31, 2023.
DETAILS OF WORK TO BE DONE
Not applicable.
Report prepared by: Sharon Lingertat, extension 5717
Emails: sharon.lingertat(a)-trca.ca
For sharon.lingertat(a)trca.ca
Date: September 1, 2021
Attachments: 1
Attachment 1: CFN 65394 — Executive Report — LSBE and Gardiner
Attachment 1: CFN 65394 - Executive Report - LSBE and Gardiner
WATERFRONT TORONTO
To construct, reconstruct, erect or place a building or structure, site grade, temporarily or
permanently place, dump or remove any material originating on the site or elsewhere and alter a
watercourse on Lake Shore Boulevard East, between Carlaw Avenue and the Don Roadway, in
the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as
located on property owned by the City of Toronto, Ports Toronto and CreateTO.
The purpose is to reconstruct the Lake Shore Boulevard bridge located over the mouth of the
Don River, widen Lake Shore Boulevard from the Don Roadway to Carlaw Avenue, relocate the
rail spur line, remove the Gardiner Logan ramps and construct the public realm associated with
this area, in the City of Toronto. These are enabling works associated with the redevelopment
of the Toronto Port Lands Flood Protection and Don Mouth Naturalization project and the
Gardiner Expressway and Lake Shore Boulevard Reconfiguration work.
MAPLOCATION.�v -
N
-e
The permit will be issued for the period of September 2, 2021 to September 1, 2023 in
accordance with the following documents and plans which form part of this permit:
• Drawing LSA -0001; General Notes; prepared by Entuitive and Planmac Engineering Inc. on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -0002; Siltation and Erosion Control Plan; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C100; Removals Utility Services, STA. 9+830 to STA. 9+925; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C101; Removals Utility Services, STA. 9+935 to STA. 10+110; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C102; Removals Utility Services, STA. 10+110 to STA. 10+291; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C103; Removals Utility Services, STA. 10+291 to STA. 10+473; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C104; Removals Utility Services, STA. 10+473 to STA. 10+650; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C105; Removals Utility Services, STA. 10+650 to STA. 10+820; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C106; Removals Utility Services, STA. 10+820 to STA. 10+880; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C107; Removals Road, STA. 9+804 to STA. 9+935; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C108; Removals Road, STA. 9+935 to STA. 10+110; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C109; Removals Road, STA. 10+110 to STA. 10+291; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C110; Removals Road, STA. 10+291 to STA. 10+473; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C111; Removals Road, STA. 10+473 to STA. 10+650; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C112; Removals Road, STA. 10+650 to STA. 10+820; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C113; Removals Road, STA. 10+820 to STA. 10+958; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C114; Removals Gardiner Ramp, STA. 9+847 to STA. 9+985; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C115; Removals Gardiner Ramp, STA. 9+985 to STA. 10+160; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C116; Removals Gardiner Ramp, STA. 10+160 to STA. 10+340; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C117; Removals Gardiner Ramp, STA. 10+340 to STA. 10+510; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C200; New Construction, STA. 9+804 to STA. 9+965; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C201; New Construction, STA. 9+965 to STA. 10+125; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C202; New Construction, STA. 10+125 to STA. 10+285; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C203; New Construction, STA. 10+285 to STA. 10+445; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C204; New Construction, STA. 10+445 to STA. 10+605; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C205; New Construction, STA. 10+605 to STA. 10+765; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C206; New Construction, STA. 10+765 to STA. 10+910; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C207; New Construction - Watermain Relocation North of Lakeshore Blvd. E.;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C208; New Construction - Storm System Layout, STA. 9+950 to STA. 10+310;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C209; New Construction - Storm System Layout, STA. 10+310 to STA. 10+670;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C210; New Construction - Storm System Layout, STA. 10+670 to STA. 10+960;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C300; Typical Sections, STA. 9+900; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C301; Typical Sections, STA. 10+220; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C302; Typical Sections, STA. 10+620; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C303; Catchbasin Details, CB 2; prepared by Entuitive and Planmac Engineering
Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C304; Catchbasin Details, CB 5 to CB 8; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C305; Catchbasin Details, CB 9 to CB 12; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C306; Catchbasin Details, CB 13 to CB 16; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C307; Catchbasin Details, CB 17 to CB 20; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C308; Catchbasin Details, CB 21 to CB 24; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C309; Catchbasin Details, CB 25 to CB 28; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C310; Catchbasin Details, CB 29 to CB 32; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C311; Catchbasin Details, CB 33 to CB 36; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C312; Catchbasin Details, CB 37 to CB 40; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C313; Catchbasin Details, CB 41 to CB 44; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C314; Catchbasin Details, CB 45 to CB 48; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C315; Typical Catch Basin Details - Connection to Soil Cell & Planting Area;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C316; Catch Basin Overflow Connection to Storm Sewer, Details; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C317; Soil -Cell Connection to Storm Sewer Details; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C310; Planting Area Connection to Storm Sewer Details; prepared by Entuitive
and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -C319; Planting Area Drain Details; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C320; Soil -Cell Drain Details; prepared by Entuitive and Planmac Engineering
Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C321; Soil -Cell Drain Details; prepared by Entuitive and Planmac Engineering
Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C322; Monitoring Well Detail; prepared by Entuitive and Planmac Engineering
Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C400; Rail Road Crossing Details: 3000 Watermain at Saulter Street; prepared
by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -C401; Rail Road Crossing Details: 3000 Watermain at Booth Avenue; prepared
by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -C402; Rail Road Crossing Details: 40001 Watermain at Logan Avenue; prepared
by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -C403; Rail Road Crossing Details: 3000 Watermain at Logan Avenue; prepared
by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -C404; Rail Road Crossing Details: 15001 Watermain at Morse Street; prepared by
Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -C405; Rail Road Crossing Details: 3000 Watermain at Carlaw Avenue; prepared
by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -C406; Rail Road Crossing Details: 3000 Sanitary Sewer East of Don Roadway;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -C407; Rail Road Crossing Details: 5250 Storm Sewer East of Don Roadway;
prepared by Entuitive and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -0500; River Excavation Sections Under Lakeshore Bridge; prepared by Entuitive
and Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -C700; City of Toronto Standard Drawings; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C701; City of Toronto Standard Drawings; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C702; City of Toronto Standard Drawings; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C703; Ontario Provincial Standard Drawings; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -C704; City of Toronto Standard Drawings and OPSD; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C800; Design Sections, STA. 9+825 to STA. 9+850; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C801; Design Sections, STA. 9+875 to STA. 9+900; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C802; Design Sections, STA. 9+925 to STA. 9+950; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C803; Design Sections, STA. 9+975 to STA. 10+000; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C804; Design Sections, STA. 10+025 to STA. 10+050; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C805; Design Sections, STA. 10+075 to STA. 10+100; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C806; Design Sections, STA. 10+125 to STA. 10+150; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C807; Design Sections, STA. 10+175 to STA. 10+200; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C808; Design Sections, STA. 10+225 to STA. 10+250; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C809; Design Sections, STA. 10+275 to STA. 10+300; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C810; Design Sections, STA. 10+325 to STA. 10+350; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C811; Design Sections, STA. 10+375 to STA. 10+400; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C812; Design Sections, STA. 10+425 to STA. 10+450; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C813; Design Sections, STA. 10+475 to STA. 10+500; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C814; Design Sections, STA. 10+525 to STA. 10+550; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C815; Design Sections, STA. 10+575 to STA. 10+600; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C816; Design Sections, STA. 10+625 to STA. 10+650; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C817; Design Sections, STA. 10+675 to STA. 10+700; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16, 2021;
• Drawing LSA -C818; Design Sections, STA. 10+725 to STA. 10+750; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C819; Design Sections, STA. 10+775 to STA. 10+800; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C820; Design Sections, STA. 10+825 to STA. 10+850; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -C821; Design Sections, STA. 10+875; prepared by Entuitive and Planmac
Engineering Inc. on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
June 16, 2021;
• Drawing LSA -L-101; Key Plan; prepared by Entuitive, West 8 and The Planning Partnership on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-110; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-111; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-112; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-113; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-114; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-115; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-116; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-117; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-118; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-119; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-120; Landscape Removal and Protection Plan; prepared by Entuitive, West 8
and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received
by TRCA on June 16, 2021;
• Drawing LSA -L-200; Materials Plan Legend; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-201; Materials Plan, Lake Shore Blvd E - Keating Channel to Don Roadway;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-202; prepared by Entuitive, West 8 and The Planning Partnership on behalf of
Waterfront Toronto; received by TRCA on June 16, 2021;
• Drawing LSA -L-203; Materials Plan, Lake Shore Blvd E - B/W Don Roadway and Saulter Street;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-204; Materials Plan, Lake Shore Blvd E - At Saulter Street; prepared by
Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto; dated May 31,
2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-205; Materials Plan, Lake Shore Blvd E - B/W Saulter Street and Bouchette
Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-206; Materials Plan, Lake Shore Blvd E - B/W Saulter Street and Bouchette
Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-207; Materials Plan, Lake Shore Blvd E - B/W Bouchette Street and Logan
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-208; Materials Plan, Lake Shore Blvd E - B/W Bouchette Street and Logan
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-209; Materials Plan, Lake Shore Blvd E - B/W Logan Avenue and Carlaw
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-210; Materials Plan, Lake Shore Blvd E - B/W Logan Avenue and Carlaw
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-300; Layout Plan Legend; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-301; Layout Plan, Lake Shore Blvd E - Keating Channel to Don Roadway;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-302; Layout Plan, Lake Shore Blvd E - B/W Don Roadway and Saulter Street;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-303; Layout Plan, Lake Shore Blvd E - B/W Don Roadway and Saulter Street;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-304; Layout Plan, Lake Shore Blvd E - At Saulter Street; prepared by Entuitive,
West 8 and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -L-305; Layout Plan, Lake Shore Blvd E - B/W Saulter Street and Bouchette
Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-306; Layout Plan, Lake Shore Blvd E - B/W Saulter Street and Bouchette
Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-307; Layout Plan, Lake Shore Blvd E - B/W Bouchette Street and Logan
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-308; Layout Plan, Lake Shore Blvd E - B/W Bouchette Street and Logan
Avenue; prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-309; Layout Plan, Lake Shore Blvd E - B/W Logan Avenue and Carlaw Avenue;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-310; Layout Plan, Lake Shore Blvd E - B/W Logan Avenue and Carlaw Avenue;
prepared by Entuitive, West 8 and The Planning Partnership on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-400; Planting Schedule and Legend; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-401; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-402; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-403; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-404; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-405; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-406; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-407; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-408; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-409; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-410; Tree Planting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-420; Shrub and Perennial Planting Legend; prepared by Entuitive, West 8 and
The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by
TRCA on June 16,2021;
• Drawing LSA -L-421; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-422; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-423; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-424; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-425; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-426; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-427; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-428; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-429; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-430; Shrub and Perennial Planting Plan; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-450; Soil Legend; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-451; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-452; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-453; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-454; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-455; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-456; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-457; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-458; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-459; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-460; Soils Plan; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-480; Irrigation Legend; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-481; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-482; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-483; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-484; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-485; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-486; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-487; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-488; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-489; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-490; Irrigation Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-500; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-501; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-502; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-503; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-504; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-505; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-506; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-507; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-508; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-509; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-510; Lighting Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-600; Grading Legend; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-601; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-602; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-603; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-604; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-605; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-606; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-607; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-608; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-609; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-610; Grading Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-700; Intersection Plans Legend; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-701; Enlargement Plans, Don Roadway Intersection; prepared by Entuitive,
West 8 and The Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021;
received by TRCA on June 16, 2021;
• Drawing LSA -L-702; Intersection Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-703; Intersection Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-704; Intersection Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-705; Intersection Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-706; Intersection Plans; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-802; Section B1, Lakeshore Blvd - Don Roadway to Future Road West of
Saulter Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-803; Section C1, Lakeshore Blvd - Future Road West of Saulter Street to
Bouchette Street; prepared by Entuitive, West 8 and The Planning Partnership on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-804; Section 131; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-805; Section E1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-806; Section F1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-807; Section G1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-808; Section 1-11; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-809; Section 11; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-810; Section J1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-811; Section K1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-812; Section L1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-813; Section M1; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-901; Paving Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-902; Paving Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-903; Curb Details; prepared by Entuitive, West 8 and The Planning Partnership
on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June 16, 2021;
• Drawing LSA -L-904; Planting Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-905; Planting Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-906; Planting Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-907; Lighting and Furnishing Details; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-908; Stair, Handrail and Wall Details; prepared by Entuitive, West 8 and The
Planning Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA
on June 16, 2021;
• Drawing LSA -L-909; Curb Cut Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-910; Symbols Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-920; Pocket Park Plan; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-921; Pocket Park Sections; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-922; Pocket Park Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-923; Pocket Park Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-924; Pocket Park Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSA -L-925; Pocket Park Details; prepared by Entuitive, West 8 and The Planning
Partnership on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on June
16, 2021;
• Drawing LSR-D110; Bridge Demolition Plan; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-S100; General Arrangement; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-S200; Bridge Span 1 Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-S201; Bridge Span 1 Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-S210; Bridge Span 2 Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-S220; Bridge Span 3 Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-221; Bridge Span 3 Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-223; Track Fastener Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSR-T001; Port Lands Track Realignment Sheets, Plan and Profile Sheet 1; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T002; Port Lands Track Realignment Sheets, Plan and Profile Sheet 2; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T003; Port Lands Track Realignment Sheets, Plan and Profile Sheet 3; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T004; Port Lands Track Realignment Sheets, Plan and Profile Sheet 4; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T005; Port Lands Track Realignment Sheets, Plan and Profile Sheet 5; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T006; Port Lands Track Realignment Sheets, Plan and Profile Sheet 6; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T007; Port Lands Track Realignment Sheets, Plan and Profile Sheet 7; prepared
by Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on
August 12, 2021;
• Drawing LSR-T100; Port Lands Track Realignment Sheets, Typical Sections; prepared by
Entuitive on behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August
12, 2021;
• Drawing LSA -S100; General Arrangement, Roadway Bridge I; prepared by Entuitive on behalf
of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S101; General Arrangement, Roadway Bridge Il; prepared by Entuitive on behalf
of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -5103; Construction Stage Sequence Plans - Stage B1; prepared by Entuitive on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S104; Construction Stage Sequence Plans - Stage B2; prepared by Entuitive on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S105; Construction Stage Sequence Plans - Stage B3; prepared by Entuitive on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S106; Construction Staging Sections; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S201; Existing West Abutment - Removals I; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S202; Existing West Abutment - Removals II; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S203; Existing Pier Removals; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S204; Existing East Abutment - Removals; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S210; Foundation Plan and Caisson Details; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S211; West Abutment Foundations I; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S213; West Pier Foundations I; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S215; Centre Pier Foundations I; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S216; Centre Pier Foundations II; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S217; East Pier Foundation; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S218; East Abutment Foundations; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S219; Dock Wall Foundation; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S220; West Abutment Substructure; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S221; West Pier Substructure; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S222; Centre Pier Substructure; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S223; East Pier Substructure; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S224; East Abutment Substructure, Details; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S225; Bearing Pedestal Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S226; Northwest Wingwall; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S227; Northeast Wingwall; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S228; Southeast Wingwall; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S300; Bearings; prepared by Entuitive on behalf of Waterfront Toronto; dated
May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S301; Prestressed Girder Layout; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S302; Prestressed Girders I; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S303; Prestressed Girders II; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S410; Deck Layout I; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S411; Deck Layout II; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -5412; Deck Reinforcing I; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S413; Deck Reinforcing II; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S414; Approach Slabs; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S415; Rail Bridge Approach Slab; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S422; Expansion Join and Sleeper Slab; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S423; Sequence of Expansion Joint Installation; prepared by Entuitive on behalf
of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S424; Strip Seal Expansion Joint - Type 'C'; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S600; Parapet Wall I; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S602; Parapet Wall Railing; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S700; Standard Details; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S900; Utilities Bridge - General Arrangement; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S901; Utilities Bridge Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S902; Utilities Bridge Details; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -S903; Reinforced Concrete Duct Bank Details; prepared by Entuitive on behalf of
Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -D100; Demolition Drawings; prepared by Entuitive on behalf of Waterfront
Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -D101; Demolition Roadway and Railway Sections; prepared by Entuitive on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -D102; Demolition Roadway and Railway Sections; prepared by Entuitive on
behalf of Waterfront Toronto; dated May 31, 2021; received by TRCA on August 12, 2021;
• Drawing LSA -D201; Site Preparation; prepared by Entuitive on behalf of Waterfront Toronto;
dated May 31, 2021; received by TRCA on August 12, 2021;
• Letter of Commitment; prepared by Waterfront Toronto; dated August 24, 2021; received
August 24, 2021;
• Drawing LSA -C107; Removals Road, STA. 9+804 to STA. 9+935; prepared by Entuitive and
Planmac Engineering Inc. on behalf of Waterfront Toronto; dated December 17, 2020; received
by TRCA on August 11, 2021;
• Drawing L200; Grading Plan; prepared on behalf of Waterfront Toronto; dated June 15, 2021;
received by TRCA on August 11, 2021;
• 6.11 Adverse Weather Conditions Response Protocols; (1 Page); prepared by Ellis Don;
received by TRCA on August 11, 2021;
• 9.13 Working In Poor Weather Conditions; (1 Page); prepared by Ellis Don; received by TRCA
on August 11, 2021;
• 9.14 Working Over and Around Water; (1 Page); prepared by Ellis Don; received by TRCA on
August 11, 2021.
Application -Specific Permit Conditions
A minimum of three (3) weeks prior to the start of construction, the Proponent must submit
engineer stamped final drawings for the temporary dockwall work which have been signed and
stamped by a professional to the satisfaction of TRCA. Once the drawings have been approved,
a TRCA permit revision will be issued. Construction of the temporary dockwall must not begin
prior to issuance of the permit revision.
A minimum of three (3) weeks prior to the start of construction, the Proponent must submit final
drawings for the erosion and sediment control measures to be implemented, including but not
limited to isolation measures for work in or near water to the satisfaction of TRCA. Once the
drawings have been approved, a TRCA permit revision will be issued. Construction of the bridge
must not begin prior to issuance of the permit revision.
A minimum of three (3) weeks prior to the scheduled start of construction, the Proponent must
submit a detailed flood contingency/emergency response plan for any in or near water work
during a rain event demonstrating how risks to workers/on-site personnel and equipment from
flooding (e.g., resulting from ice jams, storms, etc.) during construction will be minimized and/or
avoided. Once the plan has been approved, a TRCA permit revision will be issued. Construction
in or near water must not begin prior to issuance of the permit revision.
A minimum of three (3) weeks prior to the scheduled start of construction, the Proponent must
submit detailed plans for any in -water work and confirm that there will be no increases to flood
levels during interim (construction) conditions to the satisfaction of TRCA. Once the drawings
have been approved, a TRCA permit revision will be issued. In -water construction must not
begin prior to issuance of the permit revision.
A minimum of three (3) weeks prior to the start of construction, the Proponent must submit final
drawings and supporting documentation for the Don Roadway and Lake Shore Boulevard East
(LSBE) intersection design once available to the satisfaction of TRCA. Once the drawings have
been approved, a TRCA permit revision will be issued. Construction at the Don Roadway and
LSBE intersection must not begin prior to issuance of the permit revision.
The Proponent must strictly adhere to the approved design drawings and reports, including any
TRCA redline revisions, to the satisfaction of TRCA. The Proponent acknowledges that all
proposed revisions to the design of this project that may impact TRCA interests must be
submitted for review and approval by TRCA prior to implementation of the re -designed works.
RATIONALE
The application was reviewed by staff on the basis of the following information:
Proposal:
Currently, 290 hectares of urban land east and south of the Don River are subject to risk of
flooding from the Don River during a Regulatory Storm event. This includes portions of the Port
Lands, South Riverdale, Leslieville and Cadillac Fairview lands. The Don Mouth Naturalization
and Port Lands Flood Protection Environmental Assessment (PLFP) identified major municipal
infrastructure (bridges, roads, underground services) needed to enable flood protection and
unlock development in this area. At the same time studies were underway to find a design
solution for the aging infrastructure associated with the elevated section of the Gardiner
Expressway and Lake Shore Boulevard East to improve connectivity to Toronto's downtown
waterfront, support the PLFP project and balance transportation modes through the Gardiner
Expressway and Lake Shore Boulevard Reconfiguration Environmental Assessment (2016).
The preferred design through the Environmental Assessment (EA) identified maintaining the
existing elevated expressway between Lower Jarvis Street and Cherry Street and rebuilding the
Gardiner -Don Valley Parkway (DVP) connection along an alignment further north, closer to the
rail corridor. The design also includes reconfiguring the Gardiner Expressway east of Cherry
Street, removing the elevated structure along the eastern waterfront and constructing a
landscaped six -lane boulevard including sidewalks on the north and south sides of Lake Shore
Boulevard and a bike path on the north side of the road. These public realm improvements
extend across the Lake Shore Bridge.
As such, the proposed work associated with this permit combines elements of the Gardiner East
project with the PLFP project for the area of the Lower Don to deliver the following modifications
to the Lake Shore Boulevard Bridge, Gardiner Expressway and Lake Shore Boulevard:
• Constructing two new spans to extend the Lake Shore Boulevard Bridge to accommodate
the future widening of the mouth of the Don River.
• Replacing the two existing spans of Lake Shore Boulevard Bridge and rehabilitating the
existing pier and abutments.
• Demolishing the elevated structure of the Gardiner Expressway from east of Cherry Street
to the eastern end of the Gardiner Expressway (Logan ramps).
• Demolishing and reconstructing the existing rail bridge north of the Lake Shore Boulevard
bridge.
• Relocating utilities from the existing rail bridge to the new Lake Shore Bridge to
accommodate extension of this structure.
• Realigning/widening Lake Shore Boulevard from the Don Roadway to Carlaw Avenue.
• Constructing new landscaping, pedestrian and cycling facilities on the Lake Shore
Boulevard Bridge and Lake Shore Boulevard from the Don Roadway to Carlaw Avenue.
• Shifting the existing rail tracks east of the Don Roadway to the centre median of Lake
Shore Boulevard with a connection to the existing tracks at approximately Carlaw
Avenue.
Gardiner Expressway Ramp Removal
The Gardiner Expressway ramps will be removed from just west of the Don River to the eastern
end of the Gardiner Expressway. Removal of the Gardiner/Logan ramps prior to the start of
construction at the Lake Shore Boulevard East bridge will significantly increase the efficiency
and safety of construction. Due to proximity of the works required for the Lake Shore Boulevard
bridge footings located adjacent to the existing ramp footings, if the existing ramps are not
removed prior to start of construction, underpinning of the Gardiner ramps and monitoring of the
ramps stability would be required with additional costs. The existing ramps also complicate the
installation of the foundations for the new bridge spans due to low overhead clearance by the
ramps if not removed. The ramps also limit access for cranes to install bridge girders and other
related structural elements required for the bridge extension. Safety of workers will also be
increased through ramp removal.
Lake Shore Boulevard and Bridge
Reconstruction of the Lake Shore Boulevard East bridge is a critical component of the design
for flood protection in this area. The current width of the Don River mouth over which the Lake
Shore Boulevard East bridge and rail bridge traverses act as a pinch point restricting the
passage of water within the Don River. This proposal involves widening the existing bridge
through the construction of two additional bridge spans (approximately 24 m in width each) on
the west side of the existing bridge to accommodate the future widening of the Don River at this
location (widening of the Don River is being reviewed through a separate permit application and
through permit revisions associated with this permit). In addition, the Gardiner East design
requires that the Lake Shore Boulevard bridge be widened to accommodate the expected
increase in traffic resulting from the planned removal of the overhead Gardiner/Logan ramps. As
such, the existing two spans currently used to convey flows from the Don River will be extended
to accommodate the widened bridge structure in order to achieve the flood protection objectives
of the PLFP EA, the expanded public realm infrastructure (cycling and pedestrian
infrastructure), 3 lanes of traffic in each direction with additional left turning lanes at
intersections, the Harbour Lead Rail Line and space to accommodate relocated utilities. The
new bridge will also be designed to prevent ice build-up on the bridge piers to reduce the risk of
an ice jam in the future Sediment and Debris Management Area (under separate review) and
improve conveyance of ice flows to the future Ice Management Area and Keating Channel
located south of the bridge. A new 300 to 400 mm diameter watermain will also be constructed
within the road alignment. Plans for the temporary dockwalls (required for construction) and
plans for the Don Roadway and Lake Shore Boulevard intersection still need to be provided and
are covered under the additional conditions associated with this permit.
Harbour Lead Rail Line Relocation
As noted above, the existing Harbour Lead Rail Line will be removed and relocated to the newly
widened Lake Shore Boulevard bridge. East of the bridge, between the Don Roadway to
Carlaw Avenue the track will be upgraded to meet current safety standards and relocated to the
middle of Lake Shore Boulevard within a dedicated median. The relocation will begin
immediately east of the Don Roadway where it will transition to the median until it crosses
Carlaw Avenue, where it will tie into the existing track that is already located within the median
of Lake Shore Boulevard. To accommodate the median, the westbound lanes and public realm
north of Lake Shore Boulevard will shift north into the land that is made available by the
relocation of the track.
The rail spur line at the Keating Rail Yards previously served Toronto Water's Ashbridges Bay
Treatment Plant, as well as two employment sites in the Port Lands. Due to multiple capital
works projects in the area, the spur line has not been in service since 2018 and as such Toronto
Water is now supporting its Ashbridges Bay operations through the use of trucks. When
operational, use of this spur line has been relatively infrequent and typically only at night.
Waterfront Toronto's design for the Lake Shore Boulevard Bridge assumes that the spur line will
remain in its existing location where it crosses the Don River.
Public Realm
This project will deliver significant public realm improvements and connections that respond to
community needs. It will also enable development of the Keating Channel Precinct, a plan that
envisions mixed-use development complete with parks and a waterside promenade generally
located on both sides of the Keating Channel.
Widening the Lake Shore Boulevard Bridge will allow for the reconstruction of the intersection of
Lake Shore Boulevard East and the Don Roadway. This intersection is currently challenging for
pedestrians to navigate and presents a potential safety issue. As part of the PLFP project, the
pedestrian bridge north of the Lake Shore Boulevard Bridge will also be removed. The
replacement for this critical east -west cycling connection is ultimately captured in the
reconstructed Lake Shore Boulevard Bridge. Public realm improvements will include bi-
directional protected cycling lanes, generous sidewalks with landscaping and planted buffers
and pocket parks/social seating areas adjacent to the cycling lanes on the north side of the
road.
Timing
It is expected that construction will begin with the removal of the Gardiner/Logan ramps and that
work related to this permit including the bridge, relocation of the rail spur line and widening of
Lake Shore Boulevard East will be completed by December 2024.
Control of Flooding:
Although the site is currently within the Don River flood plain, the proposed works are not
anticipated to impact flooding, flood storage or conveyance of flood waters. The goal of the
PLFP project is to address current flood risk thereby protecting the Port Lands and adjacent
areas for future development and from potential loss of life and costly flood damage. It is
anticipated that flow conveyance through the bridge will be improved as a result of this work.
As requested by TRCA staff through the permit conditions associated with this permit, the
Proponent must also submit a detailed flood contingency/emergency response plan for any in or
near -water work during rain events. The Proponent must also submit detailed plans for any in -
water work with confirmation that there will be no increases to flood levels during interim
(construction) conditions to the satisfaction of TRCA, prior to the start of work.
Pollution:
Erosion and sediment control measures will be installed prior to construction and maintained for
its duration. These measures are being implemented to prevent the release of construction
generated sediment into the Don River. As requested by TRCA staff through the permit
conditions associated with this permit, the Proponent must also submit final plans for the
erosion and sediment control measures to the satisfaction of TRCA, prior to the start of work.
Dynamic Beaches:
Not applicable.
Erosion:
No geotechnical/slope stability issues have been identified
Conservation of Land:
Where impacts to local fish populations may occur during their spawning, nursery and migratory
periods, construction timing windows should apply to in-water/near-water activities. The
proponent/contractor should confirm applicability and dates with appropriate provincial and
federal agencies.
Plantings
Through the public realm work the reconfigured Lake Shore Boulevard from
approximately the Lake Shore Boulevard Bridge eastward will be reconfigured with
landscaping and planter buffers. Approximately 725 trees and large shrubs as well as
approximately 868 smaller shrubs, over 190,000 plugs and over 15,000 bulbs. A
network of storm sewers within this redesigned road will direct stormwater to
soil/planting cells along Lake Shore Boulevard. Landscaping and water holding capacity
was coordinated with the landscape architect and connections to the cells will be via
road catch basins.
Policy Guidelines:
This proposal complies with Section 8.8 Interference with a Watercourse and Section 8.9
Infrastructure Policies of The Living City Policies for Planning and Development in the
Watersheds of the Toronto and Region Conservation Authority.
CFN: 65394 - Application #: 0834121/TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: August 23, 2021
Section IV — Ontario Regulation 166/06, As Amended
APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO
REGULATION 166/06, AS AMENDED
Development, Interference with Wetlands and Alterations to Shorelines
and Watercourses. Pursuant to Ontario Regulation 166/06, as amended,
written permission from the Authority is required for:
a) straightening, changing, diverting or interfering in any way with the
existing channel of a river, creek, stream or watercourse, or for
changing or interfering in any way with a wetland;
b) development, if in the opinion of the Authority, the control of flooding,
erosion, dynamic beaches or pollution or the conservation of land may
be affected by the development.
A permit may be refused through a Hearing Process, if in the opinion of
the Authority, the control of flooding, erosion, dynamic beaches, pollution
or the conservation of land is affected.
Moved by: Linda Jackson
Seconded by: Ronald Chopowick
THAT standard delegated permits, permission for routine infrastructure works, minor
works letters of approval, and permits after the fact / resolution of violations granted by
Toronto and Region Conservation Authority staff, in accordance with Ontario Regulation
166/06, as amended, which are listed below, be received.
CARRIED
STANDARD DELEGATED PERMITS FOR RECEIPT— STAFF APPROVED AND ISSUED
Delegated Permits are processed by Development and Engineering Services Division staff,
authorized by designated staff appointed as Enforcement Officers by the Board of Directors and
received monthly by the Executive Committee. Delegated permits are categorized as standard,
routine infrastructure works, emergency infrastructure works, minor works and permits after the
fact/resolution of violations. Standard permits are non-complex permissions consistent with
TRCA approved policies and procedures and issued for a time period of two years or less.
CITY OF BRAMPTON
2366885 ONTARIO INC. C/O VANDYK PROPERTIES - Etobicoke Creek Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek
Watershed to permit in-situ capping of a wetland feature.
CFN: 65141 - Application #: 0719/21/BRAM
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: August 25, 2021
8290423 CANADA INC. - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed, site
servicing and grading in support of a future transportation facility on lands known municipally as
11 Highway 50, in the City of Brampton.
CFN: 65135 - Application #: 0708/21/BRAM
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Anthony Syhlonyk, extension 5272, email
anthony.syhlonyk@trca.ca
Date: May 26, 2021
ALECTRA UTILITIES CORPORATION - Etobicoke Creek Watershed
The purpose is to install a new service cable duck bank at 41 Ashwood Crescent as located on
the property owned by Peter Hazen, and 43 Ashwood Crescent as located on the property
owned by Andrea and Katherine Reid, in the City of Brampton, Etobicoke Creek Watershed.
Permission has been granted to Alectra Utilities corporation by the City of Brampton for works
on property owned by the City of Brampton in the right of way municipally known as 53 Aloma
Crescent.
CFN: 63814 - Application #: 0993/20/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: June 10, 2020
27 LOONS CALL CRESCENT - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the development of a second dwelling unit, a side entrance, a
new window and the enlargement of 3 existing windows, located in the basement of the existing
house. The subject property is located at 27 Loons Call Crescent, in the City of Brampton.
CFN: 65378 - Application #: 0947/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 27, 2021
CITY OF BRAMPTON - Etobicoke Creek Watershed
The purpose is to undertake rehabilitation of an existing bridge to accommodate safe cycling
facilities. The existing bridge spans over Etobicoke Creek near 13 Bartley Bull Parkway in the
City of Brampton. No in water works are proposed.
CFN: 64794 - Application #: 0425/21/13RAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 20, 2021
CSPAC INDUSTRIAL ACE DR. GP INC. BEHALF OF CSPAC INDUSTRIAL ACE DR. L.P. -
Humber River Watershed
The purpose is to facilitate topsoil stripping and grading in support of an eventual 46,000 sq. m.
(500,000.00 sq. ft.) warehouse with office and parking on lands known municipally as 100 Ace
Drive, in the City of Brampton.
CFN: 65381 - Application #: 0946/211131RAM
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Anthony Syhlonyk, extension 5272, email
anthony.syhlonyk@trca.ca
Date: July 15, 2021
GRANDBAY HOLDINGS INC. - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed,
initial topsoil removal, rough grading activities, and the installation of ESC measures in support
of a future commercial/industrial use within the Bram East Sub -Area 1 Block Plan, between
Castlemore Road and Regional Road 50, in the City of Brampton.
CFN: 64923 - Application #: 0525/21/131RAM
Report Prepared by: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
For information contact: Colleen Bonner, extension 5307, email colleen.bonner@trca.ca
Date: June 16, 2021
18 BELMONT DRIVE - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Etobicoke Creek Watershed in order to
facilitate the development of a second dwelling unit, 3 new windows, and the enlargement of 3
existing windows, located in the basement of the existing house. The subject property is located
at 18 Belmont Drive, in the City of Brampton.
CFN: 65650 - Application #: 1128/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 27, 2021
147 BRENTWOOD DRIVE - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the development of a second dwelling unit and the enlargement
of an existing window located in the basement of the existing house. The subject property is
located at 147 Brentwood Drive, in the City of Brampton.
CFN: 65369 - Application #: 0898/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 2, 2021
PATILDA CONSTRUCTION INC.; WOLVERLEIGH CONSTRUCTION LTD.; KETTLE POINT
INVESTORS INC. C/O DG GROUP - Humber River Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Humber River Watershed,
initial topsoil removal, rough grading activities, and the installation of ESC measures in support
of a future residential subdivision within Block 48 between Mayfield Road and Bramalea Road,
in the City of Brampton.
CFN: 64911 - Application #: 0496/21/BRAM
Report Prepared by: Anthony Syhlonyk, extension 5272, email anthony.syhlonyk@trca.ca
For information contact: Anthony Syhlonyk, extension 5272, email
anthony.syhlonyk@trca.ca
Date: April 20, 2021
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to undertake partial rehabilitation of culverts C6 and C7 on Mayfield Road, 920
m and 1120 m east of Innis Lake Road, in the City of Brampton as located on property owned
by the Regional Municipality of Peel. Works are to be completed in the dry.
CFN: 64656 - Application #: 0299/21/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 16, 2021
REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed
The purpose is to install a 750 mm, 600 mm, and a 200 mm diameter watermain along Mayfield
Road between Airport Road and McVean Drive, in the City of Brampton. Works will be
completed in dry conditions.
CFN: 64661 - Application #: 0300/21/BRAM
Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca
For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca
Date: July 9, 2021
30 CYNTHIA CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to develop a 1,353.74 sq.m. (14571.35 sq.ft.) 2 -storey single family dwelling,
an attached garage, an attached indoor swimming pool and sport court, a detached garage and
a driveway. The proposed works also include a septic system. The subject property is located at
30 Cynthia Crescent, in the City of Brampton.
CFN: 65384 - Application #: 0995/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 17, 2021
CITY OF MARKHAM
1212763 ONTARIO LTD. - Rouge River Watershed
The purpose is to develop within the floodplain and alter a watercourse to facilitate the
construction of a new permanent stormwater management outfall at 10271 Woodbine Avenue,
City of Markham.
CFN: 65767 - Application #: 1053/21/MARK
Report Prepared by: Quentin Hanchard, extension 5324, email quentin.hanchard@trca.ca
For information contact: Quentin Hanchard, extension 5324, email
quentin.hanchard@trca.ca
Date: August 9, 2021
5 ROUGE RIVER CIRCLE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the removal of an existing dwelling, pool, shed and septic system and
development of a new two-storey dwelling and associated septic system located at 5 Rouge
River Circle, City of Markham.
CFN: 65562 - Application #: 0932/211MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 20, 2021
ANGUS GLEN DEVELOPMENTS (2003) LTD. - Rouge River Watershed
The purpose is to undertake grading, filling, and servicing works within TRCA Regulated Area's
of the Rouge River Watershed to facilitate the development of townhouses and modifications to
a stormwater management pond located at 4071 Major Mackenzie Drive East and 4289 Major
Mackenzie Drive East, City of Markham.
CFN: 65112 - Application #: 0630/21/MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: June 8, 2021
5 SYLVIA COURT - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of a new two-storey dwelling at 5 Sylvia Court, City of
Markham.
CFN: 65115 - Application #: 0680/21/MARK
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: May 20, 2021
51 LUNAU LANE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to facilitate the development of an in -ground swimming pool located at 51 Lunau Lane in the
City of Markham.
CFN: 65764 - Application #: 1046/21/MARK
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: August 8, 2021
9 CIRCLE COURT - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to facilitate the construction of an in -ground swimming pool, an associated patio, pool
equipment pad, and cabana on lands municipally known as 9 Circle Court, City of Markham.
CFN: 65296 - Application #: 0784/211MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 20, 2021
KP LIMITED PARTNERSHIP - Rouge River Watershed
The purpose is to undertake works within TRCA Regulated Area's of the Rouge River
Watershed to facilitate preliminary site alteration and rough grading associated with Phase 1A of
Draft Approved Plan of Subdivision 19T -16M11 located on the west side of 4134 16th Avenue,
City of Markham.
CFN: 64830 - Application #: 0490/21/MARK
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: June 4, 2021
METROPIA MINTO (SIXTEENTH) HOLDING INC. - Rouge River Watershed
The purpose is to conduct minor site grading associated with the demolition and removal of an
existing building and parking area within a Regulated Area of the Rouge River watershed at
4134 16th Avenue in the City of Markham.
CFN: 65352 - Application #: 0825/211MARK
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 29, 2021
37 GLENBOURNE PARK DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the development of a replacement deck located at 37 Glenbourne Park
Drive in the City of Markham.
CFN: 65762 - Application #: 1066/21/MARK
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: August 11, 2021
80 BERNBRIDGE ROAD - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate the construction of a basement walkout located at 80 Bernbridge Road,
City of Markham.
CFN: 65559 - Application #: 0930/21/MARK
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: July 12, 2021
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA - Etobicoke Creek Watershed
The purpose is to undertake the extension of a parking lot with a temporary gravel parking lot at
4495 Tomken Road, in the City of Mississauga. There are no in -water or near water works
involved within the scope of this project.
CFN: 65280 - Application #: 0809/21/MISS
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 13, 2021
1575 DREW ROAD - Etobicoke Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Etobicoke Creek
Watershed in order to facilitate the development of a crane structure to the north and west of the
existing building. The subject property is located at 1575 Drew Road, in the City of Mississauga.
CFN: 65146 - Application #: 0774/21/MISS
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 12, 2021
CITY OF PICKERING
1133373 ONTARIO INC. - Duffins Creek Watershed
The purpose is to install a sanitary sewer within an easement from Peter Matthews Drive to
Sideline 22 in the City of Pickering.
CFN: 63801 - Application #: 0948/20/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: June 15, 2021
4982 CANSO DRIVE - Duffins Creek Watershed
The purpose is to construct an in -ground swimming pool and interlocking brick patio in the rear
yard of the existing dwelling at 4982 Canso Drive in the City of Pickering.
CFN: 64863 - Application M 0792/211PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 29, 2021
CITY OF PICKERING - Duffins Creek Watershed
The purpose is to construct a sidewalk along the south side of Finch Avenue, from 150 metres
east of Valley Farm Road to Guild Road, in the City of Pickering. No in -water work is associated
with this project.
CFN: 64907 - Application M 0696/21/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: June 29, 2021
1447 ROUGEMOUNT DRIVE - Petticoat Creek Watershed
The purpose is to construct a two storey replacement dwelling with rear covered deck and at
grade patio located at 1447 Rougemount Drive in the City of Pickering.
CFN: 65511 - Application M 0954/211PICK
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 21, 2021
ELEXICON ENERGY INC. - Duffins Creek Watershed
The purpose is to construct a new transformer station on the northeast corner of Sideline 22 and
Taunton Road to enhance the network capacity due to forecasted growth within the Seaton
area. No in -water works are proposed.
CFN: 62355 - Application M 1111/19/PICK
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: June 29, 2021
1594 MARSHCOURT DRIVE - Duffins Creek Watershed
The purpose is to construct a ground and second floor addition to an existing two storey
dwelling at 1594 Marshcourt Drive in the City of Pickering.
CFN: 63960 - Application M 0016/21/PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 4, 2021
ENBRIDGE GAS INC. - Duff ins Creek Watershed
The purpose is to construct a Feeder Station Compound and install a NPS 16 ST XHP gas
pipeline to the Feeder Station Compound on the west side of Sideline 16 Road, located
approximately one kilometer south of Concession Road 5, in the City of Pickering. No in -water
work is associated with this project.
CFN: 64004 - Application #: 1168/20/PICK
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 2, 2021
968 VISTUAL DRIVE - Frenchman's Bay Watershed
The purpose is to construct two rear additions and an attached rear deck where an existing
single family dwelling is currently located at 968 Vistula Drive in the City of Pickering.
CFN: 64862 - Application #: 0790/211PICK
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
Date: July 28, 2021
388 WOODGRANGE AVENUE - Rouge River Watershed
The purpose is to underpin the existing single family dwelling at 388 Woodgrange Avenue in the
City of Pickering.
CFN: 64859 - Application #: 0705/21/PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 15, 2021
364 SHEPPARD AVENUE - Petticoat Creek Watershed
The purpose is to construct a two storey replacement dwelling with attached rear deck and east
side basement walkout where an existing one storey single family detached dwelling is currently
located at 364 Sheppard Avenue in the City of Pickering.
CFN: 65512 - Application #: 0961/211PICK
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 21, 2021
METROPIA (NOTION ROAD) DEVELOPMENT INC. - Duffins Creek Watershed
The purpose is to install servicing, complete site grading (cut/fill) and construct townhouses at
1865 Pickering Parkway in the City of Pickering.
CFN: 64334 - Application #: 0140/21/PICK
Report Prepared by: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: February 4, 2021
87 FINCH AVENUE - Petticoat Creek Watershed
The purpose is to perform site grading and construct a new two-storey detached dwelling with a
detached garage, pool house and inground pool at the rear of 87 Finch Avenue in the City of
Pickering.
CFN: 64867 - Application #: 0871/211PICK
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 12, 2021
821 PRIMROSE COURT - Frenchman's Bay Watershed
The purpose is to construct an in -ground pool, deck stairs and patio in the rear yard of the
existing dwelling at 821 Primrose Court in the City of Pickering.
CFN: 64855 - Application #: 0660/21/PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 29, 2021
121 FINCH AVENUE - Petticoat Creek Watershed
The purpose is to construct a replacement shed in the rear yard of the existing dwelling as a
result of fire damages at 121 Finch Avenue in the City of Pickering.
CFN: 64865 - Application #: 0868/211PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 19, 2021
UNIVERSAL CITY THREE DEVELOPMENTS INC. - Frenchman's Bay Watershed
The purpose is to construct and service a thirty-one storey residential building with three levels
of underground parking at 1435 Celebration Drive in the City of Pickering.
CFN: 64866 - Application #: 0869/21/PICK
Report Prepared by: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 25, 2021
CITY OF RICHMOND HILL
775377 ONTARIO LTD. C/O TRISPIRE MANAGEMENT LTD. - Rouge River Watershed
The purpose is to conduct minor grading within a Regulated Area of the Rouge River watershed
at 11333 Leslie Street in the City of Richmond Hill.
CFN: 64977 - Application #: 0609/211RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: July 5, 2021
8356394 CANADA CORPORATION - Humber River Watershed
The purpose is to conduct grading works, construct a one -storey cemetery building, associated
parking area and septic system, cemetery driveways and landscape restoration works within a
Regulated Area of the Humber River watershed at 1100 Bethesda Side Road, in the City of
Richmond Hill.
CFN: 65126 - Application #: 0723/211RH
Report Prepared by: Linda Bui, extension 5289, email linda.bui@trca.ca
For information contact: Linda Bui, extension 5289, email linda.bui@trca.ca
Date: June 11, 2021
AMIR HESSAM LIMITED AND 668152 ONTARIO LIMITED - Rouge River Watershed
The purpose is to conduct site grading and construct infrastructure associated with the
construction of a stormwater management pond and outfall within a Regulated Area of the
Rouge River watershed at 11280 Leslie Street in the City of Richmond Hill.
CFN: 64562 - Application #: 0324/21/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: August 27, 2021
1700 STOUFFVILLE ROAD - Rouge River Watershed
The purpose is to remove an unauthorized watercourse and Provincially Significant Wetland
crossing and construct a new replacement crossing within a Regulated Area of the Rouge River
watershed at 1700 Stouffville Road in the City of Richmond Hill.
CFN: 65305 - Application #: 0777/21/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 25, 2021
BALCO DEVELOPMENTS LTD. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate grading works and the construction of a retaining wall associated
with a Site Plan (D06-19043) application at 21 and 31 Performance Drive, to permit the
development of two one -storey office buildings and parking on lands east of Leslie Street and
south of Performance Drive, in the City of Richmond Hill.
CFN: 64948 - Application #: 0606/211RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: July 20, 2021
CITY OF RICHMOND HILL - Humber River Watershed
The purpose is to undertake rehabilitation of two Storm Water Management Facilities (SWMF 8-
5 and SWMF 7-2) in the City of Richmond Hill. SWMF 8-5 is located south of King Road and
west of Young Street. The works will include removal of sediments and vegetation management
including invasive species removal (buckthorn) and dead tree removals, pipe repairs and
stabilization of eroded slope from the adjacent property. SWMF 7-2 is located west of
Headwater Crescent and north of Douglas Road. The works will include removal of sediments
and construction of a new maintenance access road from Headwaters Crescent to provide
access to the plunge pool for future inspection and maintenance activities.
CFN: 64777 - Application #: 0422/211RH
Report Prepared by: Harsha Gammanpila, extension 5629, email
harsha.gamma npila@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
Date: August 10, 2021
10 LONG HILL DRIVE - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two storey single detached dwelling, a
covered deck and an inground swimming pool at 10 Long Hill Drive, in the City of Richmond Hill.
CFN: 65067 - Application #: 0901/211RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email dlane. pi@trca.ca
Date: July 2, 2021
118 SILVER LINDEN DRIVE - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of a replacement deck in the rear yard of 118 Silver Linden
Drive, in the City of Richmond Hill.
CFN: 65060 - Application #: 0647/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 12, 2021
KING EAST DEVELOPMENTS INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate topsoil stripping, grading works and servicing associated with a
Zoning By-law Amendment (D02-19004) application at 52 Puccini, to permit residential
development on lands east of Bathurst Street and north of King Road, in the City of Richmond
Hill.
CFN: 65299 - Application #: 0909/21/RH
Report Prepared by: Linda Bui, extension 5289, email linda.bui@trca.ca
For information contact: Linda Bui, extension 5289, email linda.bui@trca.ca
Date: July 8, 2021
36 STOCKDALE CRESCENT - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the construction of an inground swimming pool, interlock patio and retaining
walls at 36 Stockdale Crescent, in the City of Richmond Hill.
CFN: 64934 - Application #: 0530/211RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: July 21, 2021
NORTH LESLIE RESIDENTIAL LANDOWNERS GROUP INC. - Rouge River Watershed
The purpose is to construct a new arterial road, install servicing infrastructure and conduct
associated grading works within a Regulated Area of the Rouge River watershed at 1080-1124
Elgin Mills Road East in the City of Richmond Hill.
CFN: 59701 - Application #: 0423/18/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: August 17, 2021
NORTH LESLIE RESIDENTIAL LANDOWNERS GROUP INC. - Rouge River Watershed
The purpose is to construct a stormwater management pond and associated outfall within a
Regulated Area of the Rouge River watershed at 1080-1124 Elgin Mills Road East in the City of
Richmond Hill.
CFN: 59876 - Application #: 0503/18/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: August 19, 2021
ONTARIO INC. 2436897 - Humber River Watershed
The purpose is to recognize an existing basement in a single detached dwelling as an additional
residential unit within a Regulated Area of the Humber River Watershed. The subject property is
located on lands municipally known as 83 Maple Grove Avenue, in the City of Richmond Hill.
CFN: 65552 - Application #: 0902/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: July 16, 2021
61 WHITE PINE TRAIL - Rouge River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Rouge River
Watershed in order to facilitate the construction of a two-storey single detached replacement
dwelling and associated septic system at 61 White Pine Trail, in the City of Richmond Hill.
CFN: 64832 - Application #: 0472/211RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: April 14, 2021
SUMMIT COMMUNITY CHURCH - Rouge River Watershed
The purpose is to remove a historic farm crossing and culverts from a watercourse within a
Regulated Area of the Rouge River watershed at 1750 Stouffville Road in the City of Richmond
Hill.
CFN: 61005 - Application #: 0096/19/RH
Report Prepared by: Anthony Sun, extension 5724, email anthony.sun@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 24, 2021
THE SUNSET SIX INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate topsoil stripping, grading works and servicing associated with
Draft Plan of Subdivision (D03-17003), Zoning By-law Amendment (D02-17009) and Site Plan
(D06-17087) applications to permit residential development on lands east of Yonge Street and
north of Stouffville Road, in the City of Richmond Hill.
CFN: 62996 - Application #: 0277/20/RH
Report Prepared by: Linda Bui, extension 5289, email linda.bui@trca.ca
For information contact: Anthony Sun, extension 5724, email anthony.sun@trca.ca
Date: June 4, 2021
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
99 BLACK CREEK BOULEVARD - Humber River Watershed
The purpose is to construct a wood deck to the rear of the existing two-storey single family
dwelling at 99 Black Creek Boulevard in the City of Toronto (Etobicoke York Community Council
Area).
CFN: 65212 - Application #: 0854/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 3, 2021
33 CORNELIUS PARKWAY - Humber River Watershed
The purpose is to construct a larger two-storey replacement dwelling with a rear deck and steps
at 33 Cornelius Parkway in the City of Toronto (Etobicoke York Community Council Area).
CFN: 62770 - Application #: 0070/201TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 28, 2021
59 RIVERVIEW HEIGHTS - Humber River Watershed
The purpose is to construct a two-storey side and rear addition with a rear deck and steps to the
two-storey single family dwelling at 59 Riverview Heights in the City of Toronto (Etobicoke York
Community Council Area).
CFN: 62877 - Application #: 0150/20tTOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 28, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to carry out works to repair and protect an exposed sanitary line and severely
eroded outfall located at 263 and 265 Dixon Road, located west of Islington Avenue and south
of Dixon Road, in the City of Toronto. This permit was reviewed in accordance with the TRCA
Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15).
CFN: 63996 - Application #: 1143/201TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: August 17, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing culvert with a larger structure located on Scarlett Road
between Saxony Crescent and Chapman Road, in the City of Toronto.
CFN: 64279 - Application #: 0028/21/TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: June 25, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to replace an existing culvert (culvert 665) with a larger structure located on
Royal York Road between North Drive and Country Club Drive, in the City of Toronto.
CFN: 64280 - Application #: 0029/211TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: August 17, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to undertake culvert replacement and road reconstruction on Baywood Road
over Albion Creek, south of Royalcrest Road, in the City of Toronto.
CFN: 64281 - Application #: 0030/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 5, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to undertake culvert replacement and road reconstruction on Kipling Avenue
over Berry Creek, north of Snaresbrook Drive, in the City of Toronto.
CFN: 64282 - Application #: 0031/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 6, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to undertake resurfacing of the York Stadium Park playing field located at 2
Avon Avenue, south of Weston Road, in the City of Toronto. No in -water work is within the
scope of this project.
CFN: 64894 - Application #: 0498/21/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 16, 2021
5 GIBSON AVENUE - Humber River Watershed
The purpose is to construct a larger two-storey replacement dwelling with a rear deck and
basement walkout at 5 Gibson Avenue in the City of Toronto (Etobicoke York Community
Council Area).
CFN: 64306 - Application #: 0086/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 24, 2021
GLEN PARK ESTATES LTD. - Humber River Watershed
The purpose is to create 7 (seven) additional dwelling units within the existing building footprint
at 46 Panorama Court in the City of Toronto (Etobicoke York Community Council Area).
CFN: 65542 - Application #: 0981/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 4, 2021
7 LAKE SHORE DRIVE - Waterfront Watershed
The purpose is to underpin the existing basement and construct a new deck to the rear of the
existing single family detached dwelling at 7 Lake Shore Drive in the City of Toronto (Etobicoke
York).
CFN: 65701 -Application #: 1087/211TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: August 24, 2021
54 EDENBROOK HILL - Humber River Watershed
The purpose is to construct a one -storey single family detached dwelling at 54 Edenbrook Hill in
the City of Toronto (Etobicoke York Community Council Area). The existing dwelling will be
demolished.
CFN: 65204 - Application #: 0802/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 28, 2021
16 PUCKERIDGE CRESCENT - Mimico Creek Watershed
The purpose is to construct a pool, hot tub, and associated hardscaping and landscaping at 16
Puckeridge Crescent in the City of Toronto (Etobicoke York Community Council Area).
CFN: 64444 - Application #: 0188/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 2, 2021
2777 KIPLING AVENUE - Humber River Watershed
The purpose is to facilitate construction of eight new dwelling units within the existing apartment
building footprint at 2777 Kipling Avenue in the City of Toronto (Etobicoke York Community
Council Area).
CFN: 65225 - Application #: 0892/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 5, 2021
19 ARNOLD AVENUE - Humber River Watershed
The purpose is to construct a third storey addition over the existing building footprint, replace
and enlarge an existing rear deck and replace an existing detached garage at 19 Arnold Avenue
in the City of Toronto (Etobicoke York Community Council Area). The proposal also involves
minor hardscaping changes to the rear.
CFN: 64956 - Application #: 0550/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 16, 2021
175 CLEARBROOKE CIRCLE - Humber River Watershed
The purpose is to replace an existing detached garage at 175 Clearbrooke Circle in the City of
Toronto (Etobicoke York Community Council Area).
CFN: 63833 - Application #: 1028/201TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 23, 2021
STARLIGHT GROUP PROPERTY HOLDINGS INC. ON BEHALF OF GF 11 301 DIXON ROAD
LTD. - Humber River Watershed
The purpose is to waterproof and repair the existing stand alone two-level parking garage at 301
Dixon Road in the City of Toronto (Etobicoke York).
CFN: 65195 - Application #: 0744/21/TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: June 17, 2021
1 LAKE CRESCENT - Waterfront Watershed
The purpose is to construct a new dwelling at 1 Lake Crescent in the City of Toronto (Etobicoke
York). The previously existing dwelling was demolished.
CFN: 44515 - Application #: 0749/101TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: July 19, 2021
TORONTO DISTRICT SCHOOL BOARD - Humber River Watershed
The purpose is to resurface the existing asphalt parking lot at Elmlea Junior Public School
municipally described as 50 Hadrian Drive in the City of Toronto (Etobicoke York).
CFN: 65210 -Application #: 0810/211TOR
Report Prepared by: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
For information contact: Nicole Moxley, extension 5968, email nicole.moxley@trca.ca
Date: June 17, 2021
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
21 ARTINGER COURT - Don River Watershed
The purpose is to construct a two storey single family replacement dwelling with basement
walkout, rear stone patio and terrace at 21 Artinger Court in the City of Toronto (North York
Community Council Area).
CFN: 63642 - Application #: 0791/201TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 8, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to construct new storm and sanitary sewers on Brookbanks Drive, Roywood
Drive, Versend Drive, Hockley Place, Clayland Drive, Dukinfield Crescent and Lynedock
Crescent, and reconstruct an approximately 70 m stretch of Deerlick Creek at Roywood Drive,
east of the Don Valley Parkway, in the City of Toronto.
CFN: 63625 - Application #: 0879/20/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 14, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to rehabilitate the existing Mill Street bridge over the West Don River, just east
of Yonge Street, in the City of Toronto.
CFN: 64515 - Application #: 0205/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 14, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to undertake temporary channel reconstruction and site stabilization in Chipping
Park, just east of Don Mills Road, in the City of Toronto.
CFN: 64770 - Application #: 0349/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 27, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to construct new storm sewers and watermains on Donino Avenue, Old Yonge
Street, Brookfield Road and Plymbridge Crescent, east of Yonge Street, in the City of Toronto.
No in -water works are within the scope of the project.
CFN: 65002 - Application #: 0583/21/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 7, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to construct a switchback trail connection off of Moore Avenue to the existing
trail network and implement improvements to the existing trail surface within Moore Park Ravine
in the City of Toronto. No in -water works are within the scope of this project.
CFN: 65421 - Application #: 0913/21/TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: August 23, 2021
CRESCENT SCHOOL - Don River Watershed
The purpose is to facilitate the construction and placement of a grade beam around a portion of
the existing sports field to support a seasonal air dome over the field at 2365 Bayview Avenue -
Crescent school in the City of Toronto (North York Community Council Area).
CFN: 64635 - Application #: 0347/21/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: June 16, 2021
33 EDGEHILL ROAD - Humber River Watershed
The purpose is to construct a sub level garage and enclose the existing rear patio at 33 Edgehill
Road in the City of Toronto (Etobicoke York Community Council Area). The proposal also
includes the replacement of the existing pool, pool shed, change room and associated
landscaping.
CFN: 65529 - Application #: 0965/21/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: August 11, 2021
6 KINGHTSWOOD ROAD - Don River Watershed
The purpose is to construct a replacement two storey detached dwelling with rear terrace at 6
Knightswood Road in the City of Toronto (North York Community Council Area).
CFN: 64083 - Application #: 0017/21/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: June 29, 2021
14 PLATEAU CRESCENT - Don River Watershed
The purpose is to construct a two storey single family replacement dwelling with rear deck and
basement walkout at 14 Plateau Crescent in the City of Toronto (North York Community Council
Area).
CFN: 64965 - Application #: 0570/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: April 29, 2021
21 GLENGOWAN ROAD - Don River Watershed
The purpose is to construct a pool and pool storage shed to the rear of the existing two storey
dwelling at 21 Glengowan Road in the City of Toronto (North York Community Council Area).
CFN: 64614 - Application #: 0262/211TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: July 20, 2021
16 GLENORCHY ROAD - Don River Watershed
The purpose is to construct a second storey addition over the existing garage to the existing two
storey detached dwelling at 16 Glenorchy Road in the City of Toronto (North York Community
Council Area).
CFN: 65186 - Application #: 0695/21/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: June 15, 2021
27 BEECHWOOD AVENUE - Don River Watershed
The purpose is to construct a second storey addition, garage addition and first floor additions
with rear lawn terrace, associated hard landscaping and cabana attached to the west side of the
existing dwelling at 27 Beechwood Avenue in the City of Toronto (North York Community
Council Area).
CFN: 65683 - Application #: 1016/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 28, 2021
7 KNIGHTSWOOD ROAD - Don River Watershed
The purpose is to construct a two storey single family replacement dwelling with integral garage,
rear deck, pool, hot tub and basement walkout at 7 Knightswood Road in the City of Toronto
(North York Community Council Area).
CFN: 63543 - Application #: 0717/201TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 14, 2021
3 GREEN VALLEY ROAD - Don River Watershed
The purpose is to construct a two storey single detached dwelling with finished basement,
basement walkout and rear covered patio at 3 Green Valley Drive in the City of Toronto (North
York Community Council Area).
CFN: 63764 - Application #: 0903/20/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 16, 2021
OSSTF PROPERTIES INC. - Don River Watershed
The purpose is to facilitate the excavation and installation of the foundation to facilitate the first
phase of construction for the new three storey building at 60 Mobile Drive in the City of Toronto
(North York Community Council Area).
CFN: 65214 - Application #: 0856/21/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: June 25, 2021
39 MONTRESSOR DRIVE - Don River Watershed
The purpose is to construct a single family replacement dwelling with basement walkup at 39
Montressor Drive in the City of Toronto (North York Community Council Area).
CFN: 60160 - Application #: 0746/181TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 13, 2021
8 REVCOE DRIVE - Don River Watershed
The purpose is to construct a replacement two storey detached dwelling with rear deck at 8
Revcoe Drive in the City of Toronto (North York Community Council Area).
CFN: 57465 - Application #: 0238/17/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: August 9, 2021
47 HI MOUNT DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling with attached three car garage
and rear deck at 47 Hi Mount Drive in the City of Toronto (North York Community Council Area).
CFN: 63250 - Application #: 0528/201TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 20, 2021
36 BANNATYNE DRIVE - Don River Watershed
The purpose is to construct a two storey replacement dwelling with integral garage where an
existing single family dwelling is currently located at 36 Bannatyne Drive in the City of Toronto
(North York Community Council Area).
CFN: 64070 - Application #: 1200/20/TOR
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 30, 2021
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
CANDO APARTMENTS - Highland Creek Watershed
The purpose is to construct concrete repairs to the existing underground parking garage at 3201
Lawrence Avenue East in the City of Toronto (Scarborough Community Council Area).
CFN: 64742 - Application #: 0430/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 14, 2021
CITY OF TORONTO - Highland Creek Watershed
The purpose is to rehabilitate an existing culvert (Culvert No. 838) on Milner Avenue over East
Highland Creek (Milner Avenue between Dailing Gate and Burrows Hall Boulevard), in the City
of Toronto.
CFN: 64284 - Application #: 0068/21/TOR
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: July 13, 2021
CITY OF TORONTO - Highland Creek Watershed
The purpose is to construct three (3) new maintenance holes on Morningside Avenue, from
Military Trail to Ellesmere Road.
CFN: 65167 - Application #: 0697/21/TOR
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: June 4, 2021
8 FALLINGBROOK WOODS - Waterfront Watershed
The purpose is to construct a two storey single family detached dwelling with covered rear wood
deck, balcony, pool, basement walkout and associated landscaping on the existing vacant lot at
8 Fallingbrook Woods in the City of Toronto (Scarborough Community Council Area).
CFN: 64991 - Application #: 0664/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 17, 2021
MCDONALD'S RESTAURANTS OF CANADA - Highland Creek Watershed
The purpose is to replace one menu board and two speaker posts with two new integrated
menu boards for the restaurant drive-through lane at 1280 Markham Road in the City of Toronto
(Scarborough Community Council Area).
CFN: 65508 - Application #: 0922/211TOR
Report Prepared by: Heather Rodriguez, extension 6487, email heather. rod rig uez@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 27, 2021
Michael Nei - Highland Creek Watershed
The purpose is to construct a replacement sunroom addition at the rear of the existing dwelling
at 60 Par Avenue in the City of Toronto (Scarborough Community Council Area).
CFN: 65211 - Application #: 0853/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 25, 2021
MTCC 831 - Highland Creek Watershed
The purpose is to replace the existing interlocking pavers and construct a concrete pad,
retaining wall and parkade repairs at 3050 Ellesmere Road in the City of Toronto (Scarborough
Community Council Area).
CFN: 64753 - Application #: 0478/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 4, 2021
20 CAMERON WATSON CRESCENT - Highland Creek Watershed
The purpose is to construct a deck in the rear yard of the existing dwelling at 20 Cameron
Watson Crescent in the City of Toronto (Scarborough Community Council Area).
CFN: 64730 - Application #: 0381/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rap us@trca.ca
Date: July 13, 2021
22B CAMERON WATSON CRESCENT - Highland Creek Watershed
The purpose is to construct a partially covered deck in the rear yard of the existing dwelling at
22B Cameron Watson Crescent in the City of Toronto (Scarborough Community Council Area).
CFN: 64731 - Application #: 0382/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 13, 2021
11 HARDING BOULEVARD -Waterfront Watershed
The purpose is to construct a two storey single family dwelling, a covered front porch along with
a walkway and stairs, and a rear covered deck at 11 Harding Boulevard in the City of Toronto
(Scarborough Community Council Area).
CFN: 65194 - Application #: 0738/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 3, 2021
479 GUILDWOOD PARKWAY - Waterfront Watershed
The purpose is to construct an elevator within the existing building footprint at 479 Guildwood
Parkway in the City of Toronto (Scarborough Community Council Area).
CFN: 65199 - Application #: 0762/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 16, 2021
SUMMIT (NASHDENE-DYNAMIC) LTD. - Highland Creek Watershed
The purpose is to construct an open canopy addition to the rear of an existing industrial building
located at 125 Nashdene Road in the City of Toronto (Scarborough Community Council Area).
CFN: 64970 - Application #: 0579/21/TOR
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 12, 2021
TORONTO CATHOLIC DISTRICT SCHOOL BOARD - Highland Creek Watershed
The purpose is to demolish 10 portable classrooms on site, relocate 3 portables off site and add
15 Certified portable classrooms from another school site at 685 Military Trail in the City of
Toronto (Scarborough Community Council).
CFN: 64728 - Application #: 0357/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 11, 2021
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
442 O'CONNOR DRIVE - Don River Watershed
The purpose is to construct a pool and associated harsdcape to the rear of the existing two-
storey single family dwelling at 442 O'Connor Drive in the City of Toronto (Toronto and East
York Community Council Area).
CFN: 64985 - Application #: 0657/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 19, 2021
62 RUSSELL HILL ROAD - Don River Watershed
The purpose is to underpin the existing basement to increase ceiling height at 62 Russell Hill
Road in the City of Toronto (Toronto and East York Community Council Area).
CFN: 64995 - Application #: 0690/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 16, 2021
34 TAYLOR DRIVE - Don River Watershed
The purpose is to construct a larger two-storey replacement dwelling with an attached garage,
rear deck, and at -grade patio at 34 Taylor Drive in the City of Toronto (Toronto and East York
Community Council Area). The proposal also involves minor site grading.
CFN: 64328 - Application #: 0134/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 18, 2021
173 FERRIS ROAD - Don River Watershed
The purpose is to construct a ground floor rear addition, deck, and steps to the two-storey single
family dwelling at 173 Ferris Road in the City of Toronto (Toronto and East York Community
Council Area).
CFN: 64994 - Application #: 0672/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 20, 2021
CITY OF TORONTO - Don River Watershed
The purpose is to construct an adit tunnel and de -aeration chamber for the connection to the
Coxwell Bypass Tunnel on Matilda Street west of Carroll street, in the City of Toronto. The
proposed 4MAT adit tunnel system is one of eleven (11) wet weather flow connections (or
diversion structures) designed to connect the proposed Coxwell Bypass tunnel to existing sewer
infrastructure along the Don River. There will be no in -water works associated with the project.
CFN: 57843 - Application #: 0553/17/TOR
Report Prepared by: Zack Carlan, extension 5310, email zack.carlan@trca.ca
For information contact: Zack Carlan, extension 5310, email zack.carlan@trca.ca
Date: July 23, 2021
CITY OF TORONTO - Humber River Watershed
The purpose is to upgrade and repair the High Park Sewage Pumping Station located at 1873
Bloor Street West, just west of Parkside Drive and Wright Avenue, in the City of Toronto. No in -
water work is within the scope of this project.
CFN: 60534 - Application #: 1063/18/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 2, 2021
CITY OF TORONTO - Waterfront Watershed
The purpose is to undertake upgrades to the Ashbridges Bay Wastewater Treatment Plant,
located at 9 Leslie Street, near Commissioners Street. The works will include the construction of
a new UV Disinfection Facility, buried and exposed wastewater effluent conveyance/diversion
channels and conduits, retrofit upgrades to the existing plant water pumping station, seawall
substation and south substation buildings, and other associated works to support the
disinfection system. No in -water works are within the scope of this project. The work is a
continuation of the UV disinfection facility works permitted under TRCA permit C-170800.
CFN: 65030 - Application #: 0643/21/TOR
Report Prepared by: Alannah Slattery, extension 6443, email alannah.slattery@trca.ca
For information contact: Alannah Slattery, extension 6443, email
alannah.slattery@trca.ca
Date: July 22, 2021
CITY OF TORONTO - Waterfront Watershed
The purpose is to undertake streetscape improvements in Ivan Forrest Gardens located at 131
Glen Manor Drive, just north of Queen Street East, in the City of Toronto. No in -water work is
within the scope of this project.
CFN: 65388 - Application #: 0806/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 11, 2021
161 LOGAN AVENUE -Don River Watershed
The purpose is to construct a two-storey laneway suite to the rear at 159 Logan Avenue in the
City of Toronto (Toronto and East York Community Council Area). The existing detached
garage is to be demolished.
CFN: 63953 - Application #: 1146/20/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 20, 2021
170 PARKVIEW HILL CRESCENT - Don River Watershed
The purpose is to construct a deck, pool and steps to the side and rear of the existing two-
storey single family dwelling at 170 Parkview Hill Crescent in the City of Toronto (Toronto and
East York Community Council Area).
CFN: 64971 - Application #: 0580/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 27, 2021
159 LOGAN AVENUE - Don River Watershed
The purpose is to construct a two-storey laneway suite to the rear at 159 Logan Avenue in the
City of Toronto (Toronto and East York Community Council Area). The existing detached
garage is to be demolished.
CFN: 63954 - Application #: 1147/20/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 20, 2021
18 CONNAUGHT AVENUE - Don River Watershed
The purpose is to construct a landing and steps to the rear of the existing two-storey single
family dwelling at 18 Connaught Avenue in the City of Toronto (Toronto and East York
Community Council Area).
CFN: 65681 - Application #: 1014/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 23, 2021
33 DOUGLAS CRESCENT - Don River Watershed
The purpose is to underpin the existing basement in order to increase ceiling height at 33
Douglas Crescent in the City of Toronto (Toronto and East York Community Council Area).
CFN: 65679 - Application #: 1012/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 20, 2021
120 HUMBERCREST AVENUE - Humber River Watershed
The purpose is to replace an existing garage with a carport and to replace an existing retaining
wall and steps at 120 Humbercrest Boulevard in the City of Toronto (Toronto and East York
Community Council Area). The proposal also involves minor site grading.
CFN: 63769 - Application #: 0929/20/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 24, 2021
40 CAROLINE AVENUE - Don River Watershed
The purpose is to construct a larger replacement front porch at 40 Caroline Avenue in the City
of Toronto (Toronto and East York Community Council Area).
CFN: 65193 - Application #: 0736/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 5, 2021
11 WOODLAND HEIGHTS - Humber River Watershed
The purpose is to construct a one -storey side addition with a deck and steps, a second and third
storey addition over the existing building footprint at 11 Woodland Heights in the City of Toronto
(Toronto and East York Community Council Area).
CFN: 63955 - Application #: 1148/20/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 13, 2021
783 EASTERN AVENUE - Don River Watershed
The purpose is to construct a one -storey rear addition with a rear deck and basement walkout to
the existing two-storey single family dwelling at 783 Eastern Avenue in the City of Toronto
(Toronto and East York Community Council Area).
CFN: 64757 - Application #: 0500/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 28, 2021
166 NEVILLE PARK BOULEVARD - Waterfront Watershed
The purpose is to construct a larger three-storey single family replacement dwelling with rear
deck and steps at 166 Neville Park Boulevard in the City of Toronto (Toronto and East York
Community Council Area).
CFN: 64066 - Application #: 1184/20/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 13, 2021
132 NEVILLE PARK BOULEVARD -Waterfront Watershed
The purpose is to construct a third storey addition to the existing two storey detached dwelling
at 132 Neville Park Boulevard in the City of Toronto (Toronto and East York Community Council
Area). The proposal also includes a front addition, front porch, front balcony and front
landscaping.
CFN: 63552 - Application #: 0726/201TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: July 26, 2021
208 ELLIS AVENUE - Humber River Watershed
The purpose is to replace the existing rear deck of a two-storey single family dwelling at 208
Ellis Avenue in the City of Toronto (Toronto East York Community Council Area). The proposal
also involves minor site grading.
CFN: 65191 - Application #: 0728/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 7, 2021
13 LARCHMOUNT AVENUE - Don River Watershed
The purpose is to extend the first floor habitable space to incorporate the enclosed front porch,
new stairs at the front and a new deck to the rear of the existing two storey semi-detached
dwelling at 13 Larchmount Avenue in the City of Toronto (Toronto and East York Community
Council Area). The proposal also includes the replacement of the existing detached garage at
the rear.
CFN: 64327 - Application #: 0133/211TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: July 16, 2021
773 EASTERN AVENUE - Don River Watershed
The purpose is to construct a two-storey rear addition with associated deck and basement
walkout to the existing two-storey single family dwelling at 773 Eastern Avenue in the City of
Toronto (Toronto and East York Community Council Area).
CFN: 65221 - Application #: 0881/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 24, 2021
TORONTO TRANSIT COMMISSION - Waterfront Watershed
The purpose is to undertake the replacement of a new hydraulic passenger elevator, elevator
shaft, and new elevator machine room and sump room. The proposed works also include the
construction of a replacement gasoline fueling system, including the installation of buried
gasoline pipes and a replacement outdoor gasoline dispensing station, located at 580
Commissioners Street, in the City of Toronto. No in -water work is within the scope of this
project.
CFN: 65017 - Application #: 0613/211TOR
Report Prepared by: Alannah Slattery, extension 6443, email alannah.slattery@trca.ca
For information contact: Alannah Slattery, extension 6443, email
alannah.slattery@trca.ca
Date: July 20, 2021
WATERFRONT TORONTO - Waterfront Watershed
The purpose is to construct municipal utilities (water, sanitary and stormwater infrastructure)
along Commissioners Street, the Don Roadway, future Munition Street, Polson Street, Villiers
Street, Sauter Street and Cherry Street. Work will also include the construction of an interim
sanitary pumping station and stormwater treatment facility in the City of Toronto. These are
enabling works associated with the redevelopment of the Toronto Port Lands Flood Protection
and Don Mouth Naturalization project. No in -water work is within the scope of this project.
CFN: 61524 - Application #: 0676/19/TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
s h aron.l i nge rtat@trca.ca
Date: June 28, 2021
WATERFRONT TORONTO - Waterfront Watershed
The purpose is to reconstruct the Lake Shore Boulevard bridge located over the mouth of the
Don River, widen Lake Shore Boulevard from the Don Roadway to Carlaw Avenue, relocate the
rail spur line, remove the Gardiner Logan ramps and construct the public realm associated with
this area, in the City of Toronto. These are enabling works associated with the redevelopment of
the Toronto Port Lands Flood Protection and Don Mouth Naturalization project and the Gardiner
Expressway and Lake Shore Boulevard Reconfiguration work.
CFN: 65394 - Application #: 0834/211TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
s h a ro n.l i n g e rtat@trca. ca
Date: August 23, 2021
WATERFRONT TORONTO - Waterfront Watershed
The purpose is to complete the finishes and landscaping within the future parkland in River
Valley Park North, River Valley Park South and Promontory Park South and remove a portion of
the north dockwall within the Polson Slip to facilitate the construction of Canoe Cove, in the City
of Toronto. These are enabling works associated with the redevelopment of the Toronto Port
Lands Flood Protection and Don Mouth Naturalization project and are being approved under the
current delegated permit approval process per RES #13138/13.
CFN: 65405 - Application #: 0835/211TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: August 17, 2021
WATERFRONT TORONTO - Don River Watershed
The purpose is to undertake Early Works (site preparation) within the future Sediment and
Debris Management Area (SDMA) including initial grading, relocation of a portion of the Lower
Don Trail, relocation of an existing watermain, construction of a storm sewer system and
construction of swales. These are enabling works associated with the redevelopment of the
Toronto Port Lands Flood Protection and Don Mouth Naturalization project to prepare the site
for future construction of the SDMA. No in -water works are proposed.
CFN: 65467 - Application #: 0941/211TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: July 19, 2021
44 MARIGOLD AVENUE - Don River Watershed
The purpose is to construct a two-storey rear addition to the existing single family semi-
detached dwelling at 44 Marigold Avenue in the City of Toronto (Toronto & East York
Community Council Area). The proposal also involves construction of a rear deck and steps and
a parking pad.
CFN: 65222 - Application #: 0882/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 5, 2021
CITY OF VAUGHAN
760749 ONTARIO LTD. / LINKS FURNITURE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a dust collector at the rear of the existing
industrial building. The subject property is located on lands known municipally as 141 Cidermill
Avenue, in the City of Vaughan.
CFN: 65551 - Application #: 0889/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: June 29, 2021
CITY OF VAUGHAN - Don River Watershed
The purpose is to construct a 100 -year relief sewer within the road right-of-way (ROW) of
Brooke Street and Arnold Avenue to alleviate flooding concerns due to the surcharged
conditions of the Brooke Street Trunk Sewer. No in -water or near water works are within the
scope of this project.
CFN: 64780 - Application #: 0546/211VAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: July 14, 2021
COPPER KIRBY DEVELOPMENTS LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate site alteration works involving topsoil stripping and bulk
earthworks, on the subject lands known municipally as 11363 Highway 27, in the City of
Vaughan.
CFN: 64701 - Application #: 0372/21NAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: July 13, 2021
COUNTRY WIDE HOMES WOODEND PLACE INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the installation of sanitary and stormwater sewer infrastructure
associated with a residential subdivision development (19T -15V011) located at 11, 31, 51
Woodend Place. The proposed infrastructure works will be located within the right-of-way along
Major Mackenzie Drive and Pine Valley Drive, in the City of Vaughan.
CFN: 59243 - Application #: 0069/18/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 11, 2021
COUNTRYWIDE HOMES WOODEND PLACE INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate final grading and servicing works associated with a residential
subdivision (19T -15V011) located on lands know municipally as 11 Woodend Place, 31
Woodend Place and 51 Woodend Place, in the City of Vaughan.
CFN: 59256.A - Application #: 0095118NAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: July 14, 2021
43 BRODA DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 59 sq.m (639.4 sq.ft) addition and
replacement of the septic system. The subject property is located on lands known municipally
as 43 Broda Drive, in the City of Vaughan.
CFN: 65306 - Application #: 0778/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: June 10, 2021
175 DAVIDSON DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the replacement of the existing dwelling with a 324.57 sq.m
(3493.73 sq.ft) single detached dwelling. The subject property is located on lands known
municipally as 175 Davidson Drive, in the City of Vaughan.
CFN: 65076 - Application #: 0632/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: May 11, 2021
133 ROYAL ORCHARD BOULEVARD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
to facilitate the construction of a new two-storey dwelling at 133 Royal Orchard Boulevard, City
of Markham.
CFN: 65118 - Application #: 0684/21/VAUG
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: May 19, 2021
129 CAMLAREN CRESCENT - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate the construction of a 331.7 sq.m (3,571 sq. ft) single -detached
dwelling, interlock patio, and 0.5 -metre retaining walls. The subject property is located on lands
known municipally as 129 Camlaren Crescent, in the City of Vaughan.
CFN: 65757 - Application #: 1096/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: August 17, 2021
NASHVILLE DEVELOPMENTS (SOUTH) INC. AND NASHVILLE MAJOR DEVELOPMENTS
INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate final grading and servicing works as well as alteration and
enclosure of a watercourse on subdivision lands (19T -19V001) located at the northeast corner
of Major Mackenzie Drive and Huntington Road in Planning Block 61 West, in the City of
Vaughan.
CFN: 65310 -Application #: 0786/211VAUG
Report Prepared by: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
For information contact: Mark Howard, extension 5269, email mark.howard@trca.ca
Date: August 18, 2021
65 KIRKHILL PLACE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the replacement of the existing retaining walls and construction
of a deck, swimming pool, associated pool patio and landscaping. The subject property is
located on lands known municipally as 65 Kirkhill Place, in the City of Vaughan.
CFN: 65073 - Application #: 0635/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
hamedeh. razavi@trca. ca
Date: May 11, 2021
11 RYDER ROAD - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River Watershed
in order to facilitate the replacement of the existing dwelling with a 200 sq.m (2153 sq.ft) two
storey single family dwelling. The subject property is located on lands known municipally as 11
Ryder Road, in the City of Vaughan.
CFN: 64413 - Application #: 0179/21NAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
hamedeh. razavi@trca. ca
Date: February 12, 2021
ROYAL 7 DEVELOPMENTS LTD. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate excavation and the construction of a foundation associated with
an underground parking facility on lands known municipally as 2920 Highway 7 and identified as
Block 1, 2, 3, 6, 7, 20, 23, 24, 29, 30 on Registered Plan 65M-4490.
CFN: 65549 - Application #: 0888/211VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: July 5, 2021
ROYBRIDGE HOLDINGS LTD. C/O ZZEN GROUP - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed to facilitate the construction of a three-storey employment building with warehouse
space on the ground floor and office space located on the first, secondary and third storeys of
the building at 101 Milani Boulevard, in the City of Vaughan.
CFN: 65351 - Application #: 0818/211VAUG
Report Prepared by: Adam Miller, extension 5244, email adam.miller@trca.ca
For information contact: Adam Miller, extension 5244, email adam.miller@trca.ca
Date: June 25, 2021
VALLEY MAJOR DEVELOPMENTS LIMITED - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
watershed in order to facilitate final grading and servicing works associated with a residential
townhouse development. The subject lands are located on properties known municipally as
4433 Major Mackenzie Drive, 4455 Major Mackenzie Drive and 4477 Major Mackenzie Drive, in
the City of Vaughan.
CFN: 65353 - Application #: 0817/21/VAUG
Report Prepared by: Stephen Bohan, extension 5743, email step hen. bohan@trca.ca
For information contact: Stephen Bohan, extension 5743, email stephen.bohan@trca.ca
Date: June 23, 2021
8204 ISLINGTON AVENUE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 206.6 sq.m (2,225 sq.ft) replacement single
detached dwelling, 20.2 sq.m (228 sq.ft) deck and a new driveway. The subject property is
located within the Woodbridge Special Policy Area, on lands known municipally as 8204
Islington Avenue, in the City of Vaughan.
CFN: 61898 - Application #: 0795/19/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: August 2, 2019
TOWN OF AJAX
112 HARRISVIEW STREET - Duffins Creek Watershed
The purpose is to construct a sunroom addition with deck at the rear of the existing dwelling at
112 Harrisview Street in the Town of Ajax.
CFN: 64868 - Application #: 0875/21/AJAX
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 15, 2021
CPSP AJAX NOMINEE INC. C/O 12209152 CANADA LIMITED - Carruthers Creek
Watershed
The purpose is to reconstruct Rossland Road from Salem Road to east of Carruthers Creek and
to construct a storm water outfall and headwall on the south side of Rossland Road immediately
west of Carruthers Creek, in the Town of Ajax.
CFN: 64874 - Application #: 0483/211AJAX
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email carol ine.mugo@trca.ca
Date: July 28, 2021
HYDRO ONE NETWORKS INC. - Duffins Creek Watershed
The purpose is to conduct forestry maintenance along an existing Hydro One Networks Inc.
corridor in two locations, southwest of the Concession Road 3 and Clearside Court intersection
in the City of Pickering, and immediately south of Paulynn Park as located northwest of
Ravenscroft Road and Rossland Road intersection in the Town of Ajax.
CFN: 65183 - Application #: 0976/211AJAX
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: August 27, 2021
12 CLARELYN BOULEVARD - Duffins Creek Watershed
The purpose is to construct an in -ground pool, basement walk-up and concrete patio in the rear
yard of the existing single family dwelling at 12 Clarelyn Boulevard in the Town of Ajax.
CFN: 64856 - Application #: 0675/211AJAX
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 3, 2021
8 ELIZABETH STREET - Duffins Creek Watershed
The purpose is to construct a new two storey single family detached dwelling with basement
walkout and attached rear deck where an existing vacant lot of record is currently located at 8
Elizabeth Street in the Town of Ajax.
CFN: 64853 - Application #: 0587/211AJAX
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 30, 2021
2955A SEABREEZE - Carruthers Creek Watershed
The purpose is to construct a two storey dwelling with attached rear deck and minor grading
where an existing vacant lot of record is currently located at 2955A Seabreeze Road in the
Town of Ajax.
CFN: 64338 - Application #: 0230/21/AJAX
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 20, 2021
VILLAGE CREEK DEVELOPMENT INC - Duffins Creek Watershed
The purpose is to strip topsoil, develop and site grade to facilitate the development of six single
family dwellings with associated servicing at 520 Rossland Road West in the Town of Ajax.
CFN: 55719 - Application #: 0337/16/AJAX
Report Prepared by: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 8, 2021
22 SPIERS CRESCENT - Carruthers Creek Watershed
The purpose is to construct an in -ground pool and associated hard landscaping in the rear yard
of the existing dwelling at 22 Spiers Crescent in the Town of Ajax.
CFN: 64858 - Application #: 0704/21/AJAX
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 15, 2021
TOWN OF CALEDON
2711047 ONTARIO INC. - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the replacement of a 255.75 sq.m. (2753 sq.ft.) two-storey single
family dwelling and attached garage. The subject property is located at 86 Willow Street, in the
Town of Caledon.
CFN: 63232 - Application #: 0539/201CAL
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 13, 2021
187 HICKMAN STREET - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of an in -ground swimming pool including a
concrete patio area, armour stone retaining wall, stairs, and shed located at rear of the existing
residential dwelling associated with a municipal building permit. The subject property is located
at 187 Hickman Street, in the Town of Caledon.
CFN: 64926 - Application #: 0589/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: April 30, 2021
29 OLIVER'S LANE - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 10.67 m by 4.57 m (35 ft by 15 ft) in -ground
swimming pool with surrounding patio area located at the rear of the existing residential dwelling
associated with a municipal building permit. The subject property is located at 29 Oliver's Lane,
in the Town of Caledon.
CFN: 65574 - Application M 1054/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: August 9, 2021
10 MULLOY COURT - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 377.7 sq.m. single family two storey
residential dwelling with 103.95 sq.m. attached garage and 45.45 sq.m. covered porch area on
a vacant lot of record, including a driveway and septic system, associated with a municipal
building permit and municipal site plan application (Town File no. SPA 21-15). The subject
property is located at 10 Mulloy Court, in the Town of Caledon.
CFN: 65317 - Application M 0783/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 10, 2021
22 BAMBI TRAIL - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 7.93 m by 6.71 m (26 ft by 22 ft) L -Shaped
in -ground swimming pool including patio area and pool equipment pad located at the rear of the
existing residential dwelling associated with a municipal building permit. The subject property is
located at 22 Bambi Trail, in the Town of Caledon.
CFN: 65332 - Application M 0866/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 25, 2021
166 VICTORIA STREET - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 311 sq. m (3347.58 sq. ft.) replacement
single family two storey residential dwelling, including attached two car garage, two covered
porches at the front and rear of the dwelling and widening of current driveway, associated with a
municipal building permit. The subject property is located at 166 Victoria Street, in the Town of
Caledon.
CFN: 65316 - Application M 0852/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 24, 2021
6916 PATTERSON SIDE ROAD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the development of a fenced crossing and the installation of a
culvert within the Centreville Creek, located west of the existing barn. The subject property is
located at 6916 Patterson Side Road, in the Town of Caledon.
CFN: 65571 -Application M 1019/21/CAL
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 9, 2021
61 BOLTONVIEW CRESCENT -Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of an 9.14 m by 7.3 m (30 ft by 24 ft) L-shaped
in -ground swimming pool located at the rear of the existing residential dwelling associated with
a municipal building permit. The subject property is located at 61 Boltonview Crescent, in the
Town of Caledon.
CFN: 64724 - Application M 0449/211CAL
Report Prepared by: Andrea Terella, extension 6447, email and rea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: April 13, 2021
14 DIAMONDWOOD DRIVE - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 12.56 m by 6.46 m (41.2 ft by 21.2 ft) in -
ground pool, a 40.41 sq m (435 sq ft) cabana including change room/washroom, a 12.28 sq m
(40.28 sq ft.) pool equipment room, a hot tub and a pool enclosure fence and retaining wall
combination located at the rear of an existing residential dwelling associated with a municipal
building permit. The subject property is located at 14 Diamondwood Drive, in the Town of
Caledon.
CFN: 65325 - Application M 0867/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 25, 2021
12031 GORE ROAD - Humber River Watershed
The purpose is to undertake grading associated with the construction of a replacement dwelling
at 12031 The Gore Road, in the Town of Caledon, associated with a municipal building permit.
CFN: 65313 - Application #: 0813/21/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 23, 2021
156 OLD KING ROAD - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 3.66 m by 7.32 m (12 ft by 24 ft) in -ground
swimming pool including a concrete patio area, and pool enclosure fence located at rear of the
existing residential dwelling associated with a municipal building permit. The subject property is
located at 156 Old School Road, in the Town of Caledon.
CFN: 65327 - Application #: 0950/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 15, 2021
3 ROLLING MEADOW DRIVE - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 10.36 m by 7.92 m (34 ft by 26 ft) detached
garage located at the north west side of the existing residential dwelling associated with a
municipal building permit. The subject property is located at 3 Rolling Meadow Drive, in the
Town of Caledon.
CFN: 65039 - Application #: 0599/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: May 5, 2021
RITELAND DEVELOPMENT CORPORATION - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 438 sq.m. single family dwelling, including
attached garage, driveway and septic system on a vacant lot of record associated with a
municipal building permit and municipal site plan application (Town File No. SPA 21-33). The
subject property is located at 100 Ferrara Drive, in the Town of Caledon.
CFN: 65373 - Application #: 0993/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 26, 2021
RITELAND DEVELOPMENT CORPORATION - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 359 sq.m. single family dwelling, including
attached garage, driveway and septic system on a vacant lot of record associated with a
municipal building permit and municipal site plan application (Town File No. SPA 21-33). The
subject property is located at 54 Logan Road, in the Town of Caledon.
CFN: 65374 - Application M 0994/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 26, 2021
TOWN OF CALEDON - Etobicoke Creek Watershed
The purpose is to undertake the rehabilitation of Old School Road between Hurontario Street
and Kennedy Road, including replacement of twin culverts. All works will be undertaken in dry
conditions.
CFN: 63096 - Application M 0403/20/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: June 14, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake culvert rehabilitation and road reconstruction on Old School Road
between Kennedy Road and Heart Lake Road. All works will be undertaken in dry conditions.
CFN: 63097 - Application M 0404/20/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: June 14, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake culvert rehabilitation and road reconstruction on Old School Road
between Heart Lake Road and Dixie Road. All works will be undertaken in dry conditions.
CFN: 63098 - Application M 0405/20/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: June 14, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake the reconstruction of Centreville Creek Road from 14073
Centreville Creek Road to 14934 Centreville Creek Road, in the Town of Caledon. The road
rehabilitation works include road resurfacing of the existing two lane road, widening and paving
of existing gravel shoulder, culvert replacement/extensions and grading of road side ditches. All
works will be completed within the Town of Caledon's Right of Way. The works will be
completed in dry working conditions.
CFN: 63293 - Application M 0621/20/CAL
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: June 17, 2020
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake the reconstruction of Humber Station Road, from Patterson Side
Road to Old Church Road, in the Town of Caledon. The proposed works will be completed in
dry working conditions.
CFN: 64505 - Application #: 0174/21/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: June 4, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake sediment removal at online Stormwater Management Pond (SWM)
14 located between Albion Vaughan Road and Landsbridge Street to the east and west, and
Carriage House Road and Shady Glen Crescent to the north and south, in the Town of Caledon.
All works will be undertaken in dry conditions.
CFN: 64672 - Application #: 0337/21/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: August 11, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a recreation facility expansion including a
pool, library, gymnasium, fitness and common amenity spaces located front of the existing
recreational facility associated with a minor variance (Town File No. A028-21) and municipal
building permit. The subject property is located at 6215 Old Church Road, in the Town of
Caledon.
CFN: 65575 - Application #: 1076/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: August 12, 2021
TOWN OF WHITCHURCH-STOUFFVILLE
11731 TENTH LINE DEVELOPMENTS LIMITED - Duffins Creek Watershed
The purpose is to facilitate, within TRCA's Regulated Area of the Duffins Creek watershed, the
development of a stormwater management pond, a roadway crossing of the stream corridor,
and final grading and servicing, on lands known municipally as 11731 Tenth Line, in the Town of
W hitchurch-Stouffville.
CFN: 65124 - Application #: 0716/21NVS
Report Prepared by: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
For information contact: Jackie Burkart, extension 5304, email jackie.burkart@trca.ca
Date: June 10, 2021
40 ROSE AVENUE - Duffins Creek Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Duffins Creek
Watershed to facilitate the construction of a replacement dwelling with an attached garage, deck
and porch on a residential property municipally known as 40 Rose Avenue, Town of
W hitchurch-Stouffville.
CFN: 65766 - Application #: 1067/211WS
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: August 25, 2021
FAIRGATE (NINTH LINE) INC. - Rouge River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Rouge River
Watershed to facilitate grading, servicing and restoration plantings in support of the
development of a draft approved residential plan of subdivision (19T-20.001) located at 12668
Ninth Line, Town of Whitch urch-Stouffville.
CFN: 65638 - Application #: 1023/211WS
Report Prepared by: Michelle Bates, extension 5618, email michelle.bates@trca.ca
For information contact: Michelle Bates, extension 5618, email michelle.bates@trca.ca
Date: July 29, 2021
TOWNSHIP OF ADJALA-TOSORONTIO
1152 CONCESSION ROAD 3 - Humber River Watershed
The purpose is to undertake works within a TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a new 198.9 sq.m. (2141 sq.ft.) single family
two storey residential dwelling with 86.3 sq.m. (929 sq. ft.) attached garage and 108.1 sq.m.
(1164 sq. ft.) covered porch area on a vacant lot of record, including a driveway, septic system
and 74.3 sq.m. (800 sq. ft.) in -ground swimming pool, associated with a municipal building
permit. The subject property is located at 1152 Concession Road 3, in the Township of Adjala-
Tosorontio.
CFN: 64547 - Application #: 0482/21/ADJ
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: April 19, 2021
TOWNSHIP OF KING
20 COPPERMINE COURT - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of an in -ground swimming pool, including a pool
equipment pad and interlock patio area at the rear of the existing residential dwelling associated
with a municipal building permit. The subject property is located at 20 Coppermine Court, in the
Township of King.
CFN: 64943 - Application #: 0565/21/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: April 29, 2021
17 CHINOOK DRIVE - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of 56.6 sq. m. (609.4 sq. ft.) addition with
attached garage, including 42.47 sq. m. porch and deck located at the front and rear of the
existing residential dwelling associated with a municipal building permit. The subject property is
located at 17 Chinook Drive, in the Township of King.
CFN: 65120 - Application #: 0845/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 24, 2021
KING CITY EAST (NORTH) LANDOWNERS GROUP INC. - Humber River Watershed
The purpose is to construct spine servicing, install a Roof Drain Collector (RDC) outfall, install a
forcemain crossing, a watermain crossing, a separate sanitary sewer connection, and construct
a new 41 metre, single -span bridge and both a forcemain and watermain crossing Eaton Hall
Creek, as part of the King City East (KCE) North lands community development, in the King City
Community Plan (KCCP) area.
CFN: 64828 - Application #: 0456/211KING
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: May 6, 2021
56 MCCLURE DRIVE - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 74.42 sq. m. (800 sq. ft.) in -ground
swimming pool, including patio area, pool equipment pad and pool enclosure fence located at
the rear of the existing residential dwelling associated with a municipal building permit. The
subject property is located at 56 McClure Drive, in the Township of King.
CFN: 65361 - Application #:0861/21/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 25, 2021
312 BURNS BOULEVARD - Humber River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 484.8 sq. m. (5218.34 sq. ft.) replacement
single family dwelling including front porches and rear terrace, a 229.4 sq. m. (2469.24 sq. ft.)
attached garage and a 60.5 sq. m. (651.21 sq. ft.) swimming pool associated with a municipal
building permit. The subject property is located on lands known municipally as 312 Burns
Boulevard, in the Township of King.
CFN: 63969 - Application #: 1060/20/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: November 18, 2020
12650 7TH CONCESSION ROAD - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 6.7 m by 10.36 m (22 ft. by 34 ft.) in -ground
swimming pool, including a pool enclosure fence, concrete patio area, cabana and pool
equipment area located at the front of the existing residential dwelling associated with a
municipal building permit. The subject property is located at 12650 7th Concession Road, in the
Township of King.
CFN: 65071 - Application #: 0637/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: May 11, 2021
THE ACORN DEVELOPMENT CORPORATION - Humber River Watershed
The purpose is to undertake final grading and servicing as well as to implement buffer and
wetland restoration landscaping associated with draft approved residential plan of subdivision
19T -18K01 in the Township of King, within the King City East (KCE) North Lands.
CFN: 65123 - Application #: 0720/211KING
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 21, 2021
1246 15TH SIDEROAD - Humber River Watershed
The purpose is to undertake works within the TRCA Regulated Area of the Humber River
Watershed in order to facilitate the construction of a 11.89 m by 4.42 m (39 ft by 14.5 ft) in -
ground swimming pool, including a 54.2 sq.m. (583.45 sq.ft.) cabana, a pool equipment pad,
patio area and pool enclosure fence located at the rear of the existing residential dwelling
associated with a municipal building permit. The subject property is located at 1246 15th
Sideroad, in the Township of King.
CFN: 65364 - Application #: 0851/21/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 24, 2021
TOWNSHIP OF UXBRIDGE
1429 CONCESSION 3 - Duff ins Creek Watershed
The purpose is to construct a gazebo, greenhouse, and shed to the east of an existing one
storey single family dwelling located at 1429 3rd Concession Road in the Town of Uxbridge.
CFN: 64600 - Application #: 0332/21/UXB
Report Prepared by: Stephanie Dore, extension 5907, email stephanie.dore@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 23, 2021
PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for Routine Infrastructure Works, including Emergency Infrastructure Works
permissions, are subject to authorization by staff designated as Enforcement Officers as per
Authority Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure
works are located within a regulated area, generally within or adjacent to the hazard or natural
feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic
beaches, pollution or the conservation of land.
CITY OF BRAMPTON
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Hilldale Crescent, Hyde Park Court and Hamlet Court, in the City of Brampton, Etobicoke Creek
Watershed as located on property owned by the City of Brampton. The purpose is to install and
pull all underground cable from transformer to transformer on Hapsburg Square and Hyde Park
Crescent. Works will include open cut trench and horizontal directional drilling construction
methods. No in water works are proposed for this project.
CFN: 65282 - Application #: 0798/21/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 9, 2021
BELL CANADA
To undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Goreway Drive from Cottrelle Boulevard to Countryside Drive, in the City of Brampton, Humber
River Watershed as located on the property owned by the City of Brampton. The purpose is to
install Bell Canada ducts and devices on Goreway Drive between Cottrelle Boulevard to
Countryside Drive, in the City of Brampton. No in -water works are within the scope of this
project.
CFN: 64022 - Application #: 1192/20/13RAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 12, 2021
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Castlemore Road from Apple Valley Way to 240 m east of Apple Valley Way, in the
City of Brampton, Humber River Watershed as located on property owned by the City of
Brampton. The purpose is to install 2 new Bell conduits on the south side of Castlemore Road
from Apple Valley Way to 240 m east of Apple Valley Way in the City of Brampton. No in water
works are proposed for this project.
CFN: 64796 - Application #: 0409/21/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 21, 2021
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at Dixie Road and Father Tobin Road in the City of Brampton, Etobicoke Creek Watershed as
located on the property owned by the City of Brampton. The purpose is to install conduits and
devices at Dixie Road and Father Tobin Road in the City of Brampton. No in water works are
within the scope of this project.
CFN: 65258 - Application #: 0741/21/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 23, 2021
CITY OF BRAMPTON
To undertake off-line stormwater management pond maintenance on 10150 Dixie Road, in the
City of Brampton, Etobicoke Creek Watershed as located on property owned by City of
Brampton. The purpose is to undertake stormwater pond maintenance, including sediment
removal and final grading, on Bloore Pond (T29) located at 10150 Dixie Road, in the City of
Brampton. The works will be completed in dry working conditions.
CFN: 64519 - Application #: 0227/21/BRAM
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: July 14, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance on new roadways in a
subdivision west of Heart Lake Road, located north of Kayak Heights, in the City of Brampton,
Etobicoke Creek Watershed, as located on property owned by a private landowner to whom
Enbridge Gas Inc. is providing service at their request. The purpose is to install NPS 4 PE IP
gas pipelines on new roadways in a subdivision west of Heart Lake Road, located north of
Kayak Heights, in the City of Brampton. No in -water work is associated with this project.
CFN: 65274 - Application #: 0796/21/BRAM
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 23, 2021
REGIONAL MUNICIPALITY OF PEEL
To undertake road/pathway resurfacing or reconstruction, undertake sewer, watermain or utility
installation or maintenance within an existing roadway on Queen Street East and West, from
Mill Street South and Scott Street, and Main Street North and South, from John Street to Vivian
Lane, in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by
the City of Brampton. The purpose is to rehabilitate and replace existing sanitary sewer and
watermain and resurface roadway along Queen Street East and West, from Mill Street South
and Scott Street, and Main Street North and South, from John Street to Vivian Lane, in the City
of Brampton. No in -water works are proposed as part of this project.
CFN: 65473 - Application #: 0998/211BRAM
Report Prepared by: Emma Benko, extension 5648, email emma.benko@trca.ca
For information contact: Emma Benko, extension 5648, email emma.benko@trca.ca
Date: August 13, 2021
CITY OF MARKHAM
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on 16th Avenue, Main Street to Ninth Line, in the City of Markham, Rouge River Watershed as
located on property owned by the Regional Municipality of York. The purpose is to undertake
removal and replacement of existing pole line crossing over GO Transit Railway on 16th
Avenue. The proposed pole line installation will be higher to facilitate clearance for future
structures of the railway electrification. No in -water works are within the scope of this project.
CFN: 61523 - Application #: 0722/19/MARK
Report Prepared by: Harsha Gammanpila, extension 5629, email
harsha.gamma npila@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gamma npila@trca.ca
Date: June 23, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within future roadways in a
new subdivision, located at the northwest corner of the Denison Street and Kirkham Drive
intersection, in the City of Markham, Rouge River Watershed, as located on property owned by
a private landowner to whom Enbridge Gas Inc. is providing service at their request. The
purpose is to install NPS 2 PE IP gas pipelines in a new subdivision, located at the northwest
corner of the Denison Street and Kirkham Drive intersection, in the City of Markham. No in -
water work is associated with this project.
CFN: 65412 - Application #: 0874/21/MARK
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: July 16, 2021
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on Major Mackenzie Drive, 940m west of
Markham Road, in the City of Markham, Rouge River Watershed as located on property owned
by the Regional Municipality of York. The purpose is to undertake culvert rehabilitation work on
Major Mackenzie Drive, 940 m west of Markham Road, in the City of Markham. The works will
be undertaken in the dry.
CFN: 64382 - Application #: 0135/21/MARK
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 26, 2021
REGIONAL MUNICIPALITY OF YORK
To undertake drainage structure general maintenance on east side of Weston Road, from 9121
Weston Road to Astona Boulevard; east side of Islington Avenue near 9383 Islington Avenue;
west side of Keele Street from McDonald Street to 200 m north of Keele Street, in the City of
Vaughan, Humber River Watershed; east side of Bathurst Street from Bathurst Glen Golf
Course to 200 m north of Bathurst Street, in the City of Richmond Hill, Humber River
Watershed; west side of Ninth Line from Bethesda Side Road to 75 m south of Bethesda Side
Road; west side of Ninth Line from 285 m to 305 m south of Bethesda Side Road; west side of
Ninth Line from Bethesda Side Road to 290 m north of Bethesda Side Road; Bethesda Side
Road and Ninth Line intersection, 12828 Ninth Line; 12772 Ninth Line, in Town of Whitchurch-
Stouffville, Rouge River Watershed; 1469 York Durham Line, in Town of Whitchurch- Stouffville,
Duffins Creek Watershed; south side of Major Mackenzie Drive from 70m to 170 m west of
Warden Avenue, in the City of Markham, Rouge River Watershed as located on property owned
by the Regional Municipality of York. The purpose is to undertake road side maintenance works
including ditching works on: east side of Weston Road, from 9121 Weston Road to Astona
Boulevard; east side of Islington Avenue near 9383 Islington Avenue; east side of Bathurst
Street from Bathurst Glen Golf Course to 200 m north of Bathurst Street; west side of Keele
Street from McDonald Street to 200 m north of Keele Street; west side of Ninth Line from
Bethesda Side Road to 75 m south of Bethesda Side Road; west side of Ninth Line from 285 m
to 305 m south of Bethesda Side Road; west side of Ninth Line from Bethesda Side Road to
290 m north of Bethesda Side Road; south side of Major Mackenzie Drive from 70 m to 170 m
west of Warden Avenue. The proposed works also include one cross culvert removal and
replacement at Bethesda Side Road and Ninth Line intersection and driveway culvert removal
and replacements at 12828 Ninth Line; 12772 Ninth Line and 1469 York Durham Line.
CFN: 64655 - Application #: 0295/21/MARK
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: June 16, 2021
CITY OF MISSISSAUGA
CITY OF MISSISSAUGA
To undertake structure maintenance on Middle Road Bridge (1689 Sherway Drive), Etobicoke
Creek Watershed as located on property owned by the City of Mississauga and the City of
Toronto with permission granted by the City of Toronto and City of Mississauga. The purpose is
to undertake rehabilitation of the existing bridge that spans over Etobicoke Creek on Sherway
Drive between the City of Mississauga on the west side and the City of Toronto on the east side.
Works will be conducted in the dry.
CFN: 64671 - Application #: 0328/211MISS
Report Prepared by: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
For information contact: Kristen Sullivan, extension 6472, email kristen.sullivan@trca.ca
Date: June 16, 2021
CITY OF MISSISSAUGA
To undertake structure maintenance on an existing bridge on Bloor Street over Little Etobicoke
Creek west of Dixie Road, in the City of Mississauga, Etobicoke Creek Watershed as located on
property owned by the City of Mississauga. The purpose is to undertake rehabilitation of an
existing bridge on Bloor Street crossing over Little Etobicoke Creek west of Dixie Road, in the
City of Mississauga. There are no in -water works involved within the scope of this project.
CFN: 65272 - Application #: 0793/211MISS
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: August 13, 2021
CITY OF MISSISSAUGA
To undertake structure maintenance on an existing bridge on Eglinton Avenue East over Little
Etobicoke Creek west of Dixie Road, in the City of Mississauga, Etobicoke Creek Watershed as
located on property owned by the City of Mississauga. The purpose is to undertake bridge
rehabilitation of an existing bridge on Eglinton Avenue East over Little Etobicoke Creek west of
Dixie Road, in the City of Mississauga. There are no in -water works involved within the scope of
this project.
CFN: 65273 - Application #: 0794/21/MISS
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: August 13, 2021
CITY OF PICKERING
BELL CANADA
To undertake utility installation or maintenance within an existing roadway on Finch Avenue,
Rosebank Road, and Rougewalk Drive in the City of Pickering, Frenchman's Bay, Petticoat
Creek Watershed as located on the property owned by the City of Pickering and the Regional
Municipality of Durham. The purpose is to install conduits within the right-of-way along Finch
Avenue, Rosebank Road, and Rougewalk Drive in the City of Pickering. No in -water works are
proposed for this project.
CFN: 64516 - Application #: 0648/211PICK
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: July 9, 2021
ELEXICON ENERGY
To undertake utility pole installation along Concession Road 5, between Brock Road and
Sideline 16, in the City of Pickering, Duff ins Creek Watershed, as located on property owned by
Infrastructure Ontario and the City of Pickering. The purpose is to install new hydro poles along
Concession Road 5, between Brock Road and Sideline 16, in the City of Pickering. No in -water
work is associated with this project.
CFN: 64888 - Application #: 0477/211PICK
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 23, 2021
ELEXICON ENERGY
To undertake utility pole installation along Altona Road, located approximately 240 metres north
of Finch Avenue, in the City of Pickering, Petticoat Creek Watershed, as located on property
owned by the Canadian Pacific Railway and the Regional Municipality of Durham. The purpose
is to install new hydro poles along Altona Road, located approximately 240 metres north of
Finch Avenue, in the City of Pickering. No in -water work is associated with this project.
CFN: 65175 - Application #: 0694/211PICK
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 8, 2021
ELEXICON ENERGY
To undertake utility pole installation on Rosebank Road north of Finch Avenue near the
Canadian Pacific (CP) Rail, in the City of Pickering, Frenchman's Bay Watershed as located on
property owned by the Regional Municipality of Durham and CP Rail. The purpose is to
undertake installation of four (4) poles, and associated anchors, on Rosebank Road adjacent to
the CP Rail north of Finch Avenue, in the City of Pickering.
CFN: 65178 - Application #: 0727/211PICK
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: August 25, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility watercourse crossing by trenchless technology along
Peter Matthews Drive, approximately 870m south of Whitevale Road, in the City of Pickering,
Duffins Creek Watershed, as located on property owned by the City of Pickering as per the
Franchise Agreement with Enbridge Gas Inc. The purpose is to install a NPS 6 PE IP gas
pipeline along Peter Matthews Drive approximately 870m south of Whitevale Road, in the City
of Pickering.
CFN: 65730 - Application #: 1082/21/PICK
Report Prepared by. Brooke EllisonWareing, extension 6496, email
brooke.ell isonwarei ng@trca.ca
For information contact: Brooke EllisonWareing, extension 6496, email
brooke.ell isonwarei ng@trca.ca
Date: September 2, 2021
HYDRO ONE NETWORKS INC.
To undertake structure maintenance along an existing Hydro One Networks Inc. corridor from
Staines Road, in the City of Toronto to Audley Road, in the Town of Ajax; Rouge River,
Petticoat Creek, Duffins Creek, and Carruthers Creek Watersheds, as located on property
owned by Hydro One Networks Inc., City of Toronto, Parks Canada, City of Pickering, Regional
Municipality of Durham, Town of Ajax, Infrastructure Ontario, Toronto and Region Conservation
Authority (TRCA), and other private property owners where permissions have been obtained.
The purpose is to conduct forestry maintenance along an existing Hydro One Networks Inc.
corridor from Staines Road, in the City of Toronto to Audley Road, in the Town of Ajax. No in -
water work is associated with this project.
CFN: 63809 - Application #: 0212/21/PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: June 3, 2021
HYDRO ONE NETWORKS INC.
To undertake structure maintenance along an existing Hydro One Networks Inc. corridor from
Dixie Road in the City of Pickering to the East Duffins Creek in the Town of Ajax, and from the
intersection of Taunton Road and Westney Road to Audley Road in the Town of Ajax, Duffins
Creek, Frenchman's Bay, and Carruthers Creek Watersheds, as located on property owned by
Hydro One Networks Inc., City of Pickering, Regional Municipality of Durham, Town of Ajax,
Infrastructure Ontario, Toronto and Region Conservation Authority (TRCA), and other private
property owners where permissions have been obtained. The purpose is to conduct forestry
maintenance along an existing Hydro One Networks Inc. corridor from Dixie Road in the City of
Pickering to the East Duffins Creek in the Town of Ajax, and from the intersection of Taunton
Road and Westney Road to Audley Road in the Town of Ajax. No in -water work is associated
with this project.
CFN: 64508 - Application #: 0342/21/AJAX
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: June 7, 2021
THE REGIONAL MUNICIPALITY OF DURHAM
To undertake sewer, watermain or utility installation or maintenance within an existing roadway,
undertake sewer, watermain or utility watercourse crossing by trenchless technology along
Brock Road, from Taunton Road to immediately north of 3355 Brock Road, in the City of
Pickering, Duffins Creek Watershed as located on property owned by The Regional Municipality
of Durham. The purpose is to install new communication conduits and four (4) new vaults along
Brock Road, from Taunton Road to immediately north of 3355 Brock Road, in the City of
Pickering. No in -water work is associated with this project.
CFN: 64771 - Application #: 0712/211PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: July 13, 2021
THE REGIONAL MUNICIPALITY OF DURHAM
To undertake sewer, watermain or utility installation or maintenance within an existing roadway,
undertake sewer and watermain or utility watercourse crossing by trenchless technology along
Brock Road, Old Brock Road and Central Street, from 4235 Brock Road to the Concession
Road 9 and Claremont By -Pass intersection, in the City of Pickering, Duffins Creek Watershed
as located on property owned by the Regional Municipality of Durham and the City of Pickering.
The purpose is to install new communication conduits along Brock Road, Old Brock Road and
Central Street, from 4235 Brock Road to the Concession Road 9 and Claremont By -Pass
intersection, in the City of Pickering. No in -water work is associated with this project.
CFN: 64773 - Application #: 0733/211PICK
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: August 20, 2021
CITY OF RICHMOND HILL
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 57 King Road, located southwest of the King Road and Yonge Street intersection, in the City
of Richmond Hill, Humber River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. will be providing service at their request, within an
easement on private property and on property owned by the City of Richmond Hill as per the
Franchise Agreement with Enbridge Gas Inc. The purpose is to install a NPS 1 1/4 PE IP gas
pipeline at 57 King Road, located southwest of the King Road and Yonge Street intersection, in
the City of Richmond Hill. No in -water work is associated with this project.
CFN: 64266 - Application #: 1223/20/RH
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: August 12, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
and along a new street, located west of Leslie Street approximately 450 metres south of
Bethesda Side Road, in the City of Richmond Hill, Rouge River Watershed, as located on
property owned by a private landowner to whom Enbridge Gas Inc. is providing service at their
request. The purpose is to install NPS 2 PE IP gas pipelines along a new street, located west of
Leslie Street approximately 450 metres south of Bethesda Side Road, in the City of Richmond
Hill. No in -water work is associated with this project.
CFN: 65409 - Application #: 0873/211RH
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 14, 2021
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
BEANFIELD METROCONNECT
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on The Queensway, between Windermere Avenue and 22 Southport Street, in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on
property owned by the City of Toronto. The purpose is to install new 100 mm
telecommunication conduits and a new grade level box, on The Queensway, between
Windermere Avenue and 22 Southport Street, in the City of Toronto. No in -water work is within
the scope of this project.
CFN: 65009 - Application #: 0590/211TOR
Report Prepared by: Alannah Slattery, extension 6443, email alannah.slattery@trca.ca
For information contact: Alannah Slattery, extension 6443, email
alannah.slattery@trca.ca
Date: June 29, 2021
BEANFIELD METROCONNECT
To undertake sewer and watermain or utility installation or maintenance within existing roadway
on The Queensway, between Park Lawn Road and Mimico Creek, in the City of Toronto
(Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property
owned by City of Toronto. The purpose is to install new 100 mm telecommunication conduits,
connecting the new conduits to existing hydro pole locations, on The Queensway, between Park
Lawn Road and Mimico Creek, in the City of Toronto. No in -water work is within the scope of
this project.
CFN: 65010 -Application #: 0591/21/TOR
Report Prepared by: Alannah Slattery, extension 6443, email alannah.slattery@trca.ca
For information contact: Alannah Slattery, extension 6443, email
a Ian na h.sl attery@trca.ca
Date: July 5, 2021
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction, and undertake sewer, watermain or
utility installation or maintenance within an existing roadway on Bonnyview Drive and High
Street, north of The Queensway, in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed as located on property owned by the City of Toronto. The
purpose is to undertake sewer replacement and road reconstruction on Bonnyview Drive and
High Street, north of The Queensway, in the City of Toronto. No in -water works are associated
with this project.
CFN: 64900 - Application #: 0523/21/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 29, 2021
CITY OF TORONTO
To undertake structure maintenance, undertake sewer, watermain or utility installation or
maintenance within an existing roadway on Long Branch Avenue and 295 Lake Promenade,
south of Park Boulevard, in the City of Toronto (Etobicoke York Community Council Area),
Waterfront Watershed as located on property owned by the City of Toronto. The purpose is to
reline an existing 750 mm diameter storm sewer on Long Branch Avenue and 295 Lake
Promenade, south of Park Boulevard, in the City of Toronto. No in -water work is within the
scope of this project.
CFN: 65020 - Application #: 0618/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2021
CITY OF TORONTO
To undertake structure maintenance, undertake sewer, watermain or utility installation or
maintenance within an existing roadway on Queen's Drive, just east of Jane Street, in the City
of Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on
property owned by the City of Toronto. The purpose is to reline an existing 450 mm diameter
corrugated steel storm sewer on Queen's Drive, just east of Jane Street, in the City of Toronto.
No in -water work is within the scope of this project.
CFN: 65022 - Application #: 0620/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: August 23, 2021
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction north of Eglinton Avenue West on a
temporary access path along the Humber River, west of Emmett Avenue, in the City of Toronto
(Etobicoke York Community Council Area), Humber River Watershed as located on property
owned by the City of Toronto and the Toronto and Region Conservation Authority under
Management Agreement with the City of Toronto. The purpose is to undertake access route
restoration north of Eglinton Avenue West on a temporary access path along the Humber River,
west of Emmett Avenue, in the City of Toronto. No in -water works are associated with this
project.
CFN: 65269 - Application #: 0751/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 14, 2021
CITY OF TORONTO
To undertake sewer, watermain, or utility watercourse crossing by trenchless technology on
McManus Road, Deeth Drive, Emery Circle, Korol Avenue, and McManus Road to Emery
Circle, in the City of Toronto (Etobicoke York Community Council Area), Humber River
Watershed as located on the property owned by the City of Toronto. The purpose is to
undertake watermain rehabilitation via structural relining on McManus Road, Deeth Drive,
Emery Circle, Korol Avenue, and McManus to Emery Circle across Humber Creek, from Dixon
Road to Saskatoon Drive in the City of Toronto. No in -water works are proposed for this project.
CFN: 65424 - Application #: 0911/211TOR
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: July 30, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 80 North Drive, located east of Royal York Road, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. will be providing service at their request and on property
owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 1/4 PE IP gas pipeline at 80 North Drive, located east of Royal
York Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 65255 - Application #: 0739/211TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 16, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 54 Edenbrook Hill, located west of Royal York Road, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. is providing service at their request and on property
owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 1/4 PE IP gas pipeline at 54 Edenbrook Hill, located west of Royal
York Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 65285 - Application #: 0801/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 30, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 207 Edenbridge Drive, located west of Scarlett Road, in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. is providing service at their request and on property
owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 PE IP gas pipeline at 207 Edenbridge Drive, located west of
Scarlett Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 65393 - Application #: 0828/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 9, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 837 Royal York Road, located south of Glenroy Avenue, in the City of Toronto (Etobicoke
York Community Council Area), Mimico Creek Watershed, as located on property owned by a
private landowner to whom Enbridge Gas Inc. is providing service at their request and on
property owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc.
The purpose is to install a NPS 1 PE IP gas pipeline at 837 Royal York Road, located south of
Glenroy Avenue, in the City of Toronto. No in -water work is associated with this project.
CFN: 65395 - Application #: 0830/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 9, 2021
IMPERIAL OIL LIMITED
To undertake sewer and watermain or utility installation or maintenance within a transmission
corridor east of 115 Bankfield Drive, near Albion Road and Bankfield Drive, in the City of
Toronto (Etobicoke York Community Council Area), Humber River Watershed as located on
property owned by Hydro One Networks Inc. and the Toronto and Region Conservation
Authority under Management Agreement with the City of Toronto. The purpose is to conduct an
integrity dig to inspect and determine the condition of an existing pipeline within a transmission
corridor east of 115 Bankfield Drive, near Albion Road and Bankfield Drive, in the City of
Toronto. No in -water works are within the scope of the project.
CFN: 64017 - Application #: 1189/201TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 10, 2021
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake road/pathway resurfacing or reconstruction in Rowntree Mills Park located at 155
Rowntree Mill Rd, between Steeles Avenue West and Panorama Court, in the City of Toronto
(North York Community Council Area), Humber River Watershed as located on property owned
by the City of Toronto and the Toronto and Region Conservation Authority under Management
Agreement with the City of Toronto. The purpose is to undertake pathway reconstruction in
Rowntree Mills Park located at 155 Rowntree Mill Rd, between Steeles Avenue West and
Panorama Court, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 64657 - Application #: 0267/21/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 14, 2021
CITY OF TORONTO
To undertake borehole investigations near Wigmore Park within the East Don River Valley,
north of Eccleston Drive, in the City of Toronto (North York Community Council Area), Don River
Watershed, as located on property owned by the City of Toronto. The purpose is to conduct a
geotechnical investigation near Wigmore Park within the East Don River Valley, north of
Eccleston Drive, in the City of Toronto. No in -water work is associated with this project.
CFN: 65401 - Application #: 0831/211TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: August 13, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 3 Green Valley Road, located east of Yonge Street, in the City of Toronto (North York
Community Council Area), Don River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. is providing service at their request and on property
owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 PE IP gas pipeline at 3 Green Valley Road, located east of Yonge
Street, in the City of Toronto. No in -water work is associated with this project.
CFN: 65488 - Application #: 1004/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: August 16, 2021
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Sheppard Avenue East, from Kennedy Road for approximately 100 metres east, in the
City of Toronto (Scarborough Community Council Area), Highland Creek Watershed, as located
on property owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas
Inc. The purpose is to install a NPS 12 ST YJ HP gas pipeline along Sheppard Avenue East,
from Kennedy Road for approximately 100 metres east, in the City of Toronto. No in -water work
is associated with this project.
CFN: 65032 - Application #: 0653/211TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 7, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at the northeast corner of the Warden Avenue and St. Clair Avenue East intersection, in the City
of Toronto (Scarborough Community Council Area), Don River Watershed, as located on
property owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc.
The purpose is to install a NPS ST YJ HP gas pipeline and district station at the northeast
corner of the Warden Avenue and St. Clair Avenue East intersection, in the City of Toronto. No
in -water work is associated with this project.
CFN: 65260 - Application #: 0743/211TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 21, 2021
ROGERS COMMUNICATIONS CANADA INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along the south side of Lawrence Avenue East, south of Meadowvale Road, in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed, as located on
property owned by the City of Toronto. The purpose is to install new communication conduits
and a new Rogers vault along the south side of Lawrence Avenue East, south of Meadowvale
Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 63794 - Application #: 0931/201TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 11, 2021
TORONTO TRANSIT COMMISSION
To undertake pathway resurfacing or reconstruction of the bus ramp to/from the TTC Warden
Station on the northeast side of St. Clair Avenue East and Warden Avenue, in the City of
Toronto (Scarborough Community Council Area), Don River Watershed as located on property
owned by the City of Toronto. The purpose is to rehabilitate the pavement of the TTC Warden
Station westbound bus ramp. No in -water works are proposed for this project.
CFN: 64797 - Application #: 0649/21/TOR
Report Prepared by: Margie Akins, extension 5925, email margie.akins@trca.ca
For information contact: Margie Akins, extension 5925, email margie.akins@trca.ca
Date: June 21, 2021
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
CITY OF TORONTO
To undertake structure maintenance on Span 4 of the Prince Edward Viaduct Bridge over the
Don River, just west of Danforth Avenue and Broadview Avenue, in the City of Toronto (Toronto
and East York Community Council Area), Don River Watershed as located on property owned
by the City of Toronto. The purpose is to repair the luminous veil on Span 4 of the Prince
Edward Viaduct Bridge over the Don River, just west of Danforth Avenue and Broadview
Avenue, in the City of Toronto. No in -water work is within the scope of this project.
CFN: 61539 - Application #: 0561/191TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 29, 2021
CITY OF TORONTO
To undertake borehole investigations on Lakeshore Boulevard East, from east of Cherry Street
to the Don River, in the City of Toronto (Toronto and East York Community Council Area), Don
River Watershed as located on property owned by the City of Toronto. The purpose is to
undertake borehole investigations on Lakeshore Boulevard East in support of the Gardiner
Expressway rehabilitation project, from east of Cherry Street to the Don River, in the City of
Toronto. No in -water work is within the scope of this project.
CFN: 65007 - Application #: 0573/21/TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: July 30, 2021
CITY OF TORONTO
To undertake borehole investigations on Lakeshore Boulevard East, from east of Parliament
Street to east of the Don Roadway, in the City of Toronto (Toronto and East York Community
Council Area), Don River Watershed as located on property owned by the City of Toronto. The
purpose is to undertake borehole investigations on Lakeshore Boulevard East, from east of
Parliament Street to east of the Don Roadway, in the City of Toronto. No in -water work is within
the scope of this project.
CFN: 65391 - Application #: 0826/211TOR
Report Prepared by: Luka Medved, extension 5766, email luka.medved@trca.ca
For information contact: Luka Medved, extension 5766, email luka.medved@trca.ca
Date: June 29, 2021
ENBRIDGE GAS INC.
To undertake borehole investigations on the east side of Bayview Avenue, south of Adelaide
Street East, in the City of Toronto (Toronto and East York Community Council Area), Don River
Watershed, as located on property owned by the City of Toronto as per the Franchise
Agreement with Enbridge Gas Inc. The purpose is to undertake two borehole investigations on
the east side of Bayview Avenue, south of Adelaide Street East, in the City of Toronto. No in -
water work is associated with this project.
CFN: 64530 - Application #: 0242/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 16, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance along future Cherry Street,
between future Villiers Street and future Commissioners Street as located south of the Cherry
Street and Lake Shore Boulevard intersection, in the City of Toronto (Toronto and East York
Community Council Area), Waterfront Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. will be obtaining a permanent easement over the
proposed pipeline location. The purpose is to install a NPS 4 ST YJ IP gas pipeline along future
Cherry Street, between future Villiers Street and future Commissioners Street as located south
of the Cherry Street and Lake Shore Boulevard intersection, in the City of Toronto. No in -water
work is associated with this project.
CFN: 64778 - Application #: 0380/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: August 11, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Lake Shore Boulevard East, at the intersection of Lake Shore Boulevard East and Cherry
Street, in the City of Toronto (Toronto and East York Community Council Area), Waterfront
Watershed, as located on property owned by the City of Toronto as per the Franchise
Agreement with Enbridge Gas Inc. The purpose is to install a NPS 20 DFBE HP gas pipeline
along Lake Shore Boulevard East, at the intersection of Lake Shore Boulevard East and Cherry
Street, in the City of Toronto. No in -water work is associated with this project.
CFN: 65172 - Application #: 0693/211TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 7, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Woodland Heights, located north of The Queensway, in the City of Toronto (Toronto and
East York Community Council Area), Humber River Watershed, as located on property owned
by a private landowner to whom Enbridge Gas Inc. will be providing service at their request and
on property owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas
Inc. The purpose is to install a NPS 1 1/4 PE IP gas pipeline along Woodland Heights, and
NPS 1 PE IP gas pipelines at 7 and 11 Woodland Heights, located north of The Queensway, in
the City of Toronto. No in -water work is associated with this project.
CFN: 65181 -Application #: 0715/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: June 11, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
along Carlaw Avenue, immediately north of the Eastern Avenue and Carlaw Avenue
intersection, in the City of Toronto (Toronto and East York Community Council Area), Waterfront
Watershed, as located on property owned by the City of Toronto as per the Franchise
Agreement with Enbridge Gas Inc. The purpose is to install a NPS 4 PE IP gas pipeline along
Carlaw Avenue, immediately north of the Eastern Avenue and Carlaw Avenue intersection, in
the City of Toronto. No in -water work is associated with this project.
CFN: 65460 - Application #: 0937/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 23, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 200 Russell Hill Road, located east of Spadina Road, in the City of Toronto (Toronto and East
York Community Council Area), Don River Watershed, as located on property owned by a
private landowner to whom Enbridge Gas Inc. is providing service at their request and on
property owned by the City of Toronto as per the Franchise Agreement with Enbridge Gas Inc.
The purpose is to install a NPS 2 PE IP gas pipeline at 200 Russell Hill Road, located east of
Spadina Road, in the City of Toronto. No in -water work is associated with this project.
CFN: 65489 - Application #: 1006/21/TOR
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: August 16, 2021
WATERFRONT TORONTO
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Lake Shore Boulevard East, Villiers Street, Saulter Street South, the Don Roadway and
Commissioners Street, in the City of Toronto (Toronto and East York Community Council Area),
Waterfront Watershed, as located on property owned by the Toronto Economic Development
Corporation (TEDCO under Master License Agreement with Waterfront Toronto) and City of
Toronto. The purpose is to install sub -surface duct banks on Lake Shore Boulevard East,
Villiers Street, Saulter Street South, the Don Roadway and Commissioners Street, in the City of
Toronto. No in -water work is within the scope of this project. These are enabling works
associated with the redevelopment of the Toronto Port Lands Flood Protection and Don Mouth
Naturalization project. No in -water works are proposed.
CFN: 64659 - Application #: 0283/21/TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
s haron.l i ngertat@trca.ca
Date: June 16, 2021
WATERFRONT TORONTO
To undertake sewer, watermain or utility installation or maintenance along future Polson Street,
under the future spillway and immediately south and east of the future Flood Protection
Landform near the Don Roadway, in the City of Toronto (Toronto and East York Community
Council Area), Waterfront Watershed, as located on the property owned by the Toronto
Economic Development Corporation (TEDCO under Master License Agreement with Waterfront
Toronto). The purpose is to install sub -surface duct banks to provide electricity and
telecommunication services along future Polson Street, under the future spillway and
immediately south and east of the future Flood Protection Landform near the Don Roadway, in
the City of Toronto. These are enabling works associated with the redevelopment of the Toronto
Port Lands Flood Protection and Don Mouth Naturalization project. No in -water works are
proposed.
CFN: 64877 - Application #: 0436/21/TOR
Report Prepared by: Sharon Lingertat, extension 5717, email sharon.lingertat@trca.ca
For information contact: Sharon Lingertat, extension 5717, email
sharon.lingertat@trca.ca
Date: July 30, 2021
CITY OF VAUGHAN
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility installation or maintenance within an existing road
right-of-way (ROW) of Rutherford Road between Dufferin Street and Bathurst Street, in the City
of Vaughan, Don River Watershed as located on property owned by the Regional Municipality of
York. The purpose is to remove and install utility poles, anchors and underground ducts along
the road right-of-way (ROW) of Rutherford Road between Dufferin Street and Bathurst Street, in
the City of Vaughan.
CFN: 64264 - Application #: 1222/201VAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: June 10, 2021
ALECTRA UTILITIES CORPORATION
To undertake utility pole installation on Huntington Road, from McGillivray Road to Rutherford
Road, in the City of Vaughan, Humber River Watershed as located on property owned by the
City of Vaughan. The purpose is to undertake removal and installation of poles and anchors
within the road right-of-way (ROW) of Huntington Road, from McGillivray Road to Rutherford
Road, in the City of Vaughan. No in -water work is associated with this project.
CFN: 64666 - Application #: 0296/211VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 9, 2021
ALECTRA UTILITIES CORPORATION
To undertake utility pole installation on Highway 27 from Kirby Road to Major Mackenzie Drive
West, in the City of Vaughan, Humber River Watershed as located on property owned by the
Regional Municipality of York. The purpose is to undertake removal and installation of poles
and anchors along the road right-of-way (ROW) of Highway 27, from Kirby Road to Major
Mackenzie Drive West, in the City of Vaughan. No in -water work is associated with this project.
CFN: 64677 - Application #: 0340/21/VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: June 25, 2021
ALECTRA UTILITIES CORPORATION
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Barrhill Road from Rutherford Road to Foxhill Drive, in the City of Vaughan, Don
River Watershed as located on property owned by the Regional Municipality of York. The
purpose is to undertake installation of duct bank and cables on Barrhill Road from Rutherford
Road to Foxhill Drive, in the City of Vaughan. No in -water work is associated with this project.
CFN: 64786 - Application #: 0403/21/VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 12, 2021
ALECTRA UTILITIES CORPORATION
To undertake utility pole installation along Highway 7, between Centre Street and 1890 Highway
7, in the City of Vaughan, Don River Watershed as located on property owned by the Regional
Municipality of York. The purpose is to undertake removal and installation of poles and anchors
along Highway 7, between Centre Street and 1890 Highway 7, in the City of Vaughan. No in -
water work is associated with this project.
CFN: 64872 - Application #: 0435/211VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 12, 2021
ALECTRA UTILITIES CORPORATION
To undertake sewer, watermain or utility installation or maintenance within an existing road
right-of-way (ROW) of Jane Street from the north of Highway 7 to the north of Portage Parkway,
in the City of Vaughan, Humber River Watershed as located on property owned by the Regional
Municipality of York. The purpose is to remove and install utility poles, anchors and
underground ducts along the road right-of-way (ROW) of Jane Street from the north of Highway
7 to the north of Portage Parkway, in the City of Vaughan.
CFN: 65170 - Application #: 0692/21/VAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: June 7, 2021
BELL CANADA
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Teston Road approximately from 500 m west of Pine Valley Drive to Weston Road, in the City of
Vaughan, Humber River Watershed as located on property owned by the Regional Municipality
of York and City of Vaughan. The purpose is to undertake installation of ducts and Bell Devices
on Teston Road approximately from 500 m west of Pine Valley Drive to Weston Road. No in -
water work is associated with this project.
CFN: 64494 - Application #: 0167/211VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: June 16, 2021
BELL CANADA
To undertake sewer, watermain or utility watercourse crossing by trenchless technology on
Highway 27 near Major Mackenzie Drive West and 9700 Highway 27, in the City of Vaughan,
Humber River Watershed as located on property owned by the Regional Municipality of York,
and on private property with an access and utility easement. The purpose is to undertake
installation of ducts and Bell Devices on Highway 27 near Major Mackenzie Drive West and
9700 Highway 27, in the City of Vaughan. No in -water work is associated with this project.
CFN: 64678 - Application #: 0345/211VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 28, 2021
BELL CANADA
To undertake sewer and watermain or utility watercourse crossing by trenchless technology on
Islington Avenue near 176 Monterey Road, in the City of Vaughan, Humber River Watershed as
located on property owned by the Regional Municipality of York. The purpose is to undertake
installation of conduits on west side of Islington Avenue near 176 Monterey Road. No in -water
work is associated with this project.
CFN: 64871 - Application #: 0434/21/VAUG
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: June 29, 2021
BELL CANADA
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on Major Mackenzie Drive West, in the City of Vaughan, Humber River Watershed as located
on property owned by the Regional Municipality of York. The purpose is to remove and install
Bell pole and anchor along the road right-of-way (ROW) of Major Mackenzie Drive West, on
west side of Pine Valley Drive, in the City of Vaughan. The proposed works are related to
reconstruction of the Major Mackenzie Drive West by the Regional Municipality of York. No in -
water works are within the scope of this project.
CFN: 65416 - Application #: 0907/21NAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: August 23, 2021
CITY OF VAUGHAN
To undertake structure maintenance on 140 Glen Shields Avenue, in the City of Vaughan, Don
River Watershed as located on property owned by the City of Vaughan. The purpose is to
reconstruct existing facilities in the Glen Shield Avenue Neighbourhood Parks. The works
includes replacement of the basketball court, tennis courts, light standards, walkways and
pathway connections repair, and addition of a playground.
CFN: 65034 - Application #: 0665/21/VAUG
Report Prepared by: Manirul Islam, extension 5715, email man! rul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email man iru1.islam@trca.ca
Date: July 14, 2021
CITY OF VAUGHAN
To undertake structure maintenance on 75 Sherwood Park Drive, in the City of Vaughan, Don
River Watershed as located on property owned by the City of Vaughan. The purpose is to
resurface existing Sherwood Park Playground located at 75 Sherwood Park Drive, in the City of
Vaughan. The work also includes construction of an accessible ramp and connection of existing
stormwater manhole with the subsurface drainage system. The grade of the playground will
remain unchanged.
CFN: 65176 - Application #: 0698/21NAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email man iru1.islam@trca.ca
Date: August 23, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance along a new private
Janeway, located southeast of the Major Mackenzie Drive and Pine Valley Drive intersection, in
the City of Vaughan, Humber River Watershed, as located on property owned by a private
landowner to whom Enbridge Gas Inc. is providing service at their request. The purpose is to
install a NPS 2 PE IP gas header service along a new private laneway, located southeast of the
Major Mackenzie Drive and Pine Valley Drive intersection, in the City of Vaughan. No in -water
work is associated with this project.
CFN: 63886 - Application #: 1108/20NAUG
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel1@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
madison.antonangeli@trca.ca
Date: August 6, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 1 Hartman Avenue, in the City of Vaughan, Humber River Watershed, as located on property
owned by a private landowner to whom Enbridge Gas Inc. is providing service at their request
and on property owned by the City of Vaughan as per the Franchise Agreement with Enbridge
Gas Inc. The purpose is to install two NPS 1 PE IP gas pipelines at 1 Hartman Avenue, in the
City of Vaughan. No in -water work is associated with this project.
CFN: 65028 - Application #: 0651/21/VAUG
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: June 4, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at the northeast corner of the Pine Valley Drive and Teston Road intersection, and along Teston
Road approximately 1.6 kilometres east of Pine Valley Drive, in the City of Vaughan, Humber
River Watershed, as located on property owned by the City of Vaughan and the Regional
Municipality of York as per the Franchise Agreement with Enbridge Gas Inc. The purpose is to
install a NPS 12 ST gas pipeline at the northeast corner of the Pine Valley Drive and Teston
Road intersection, and a NPS 12 ST gas pipeline along Teston Road, approximately 1.6
kilometres east of Pine Valley Drive, in the City of Vaughan. No in -water work is associated with
this project.
CFN: 65265 - Application #: 0746/21/VAUG
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel1@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel1@trca.ca
Date: June 21, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within future roadways in a
new subdivision at 4077 Teston Road, located approximately 820 metres west of Weston Road,
in the City of Vaughan, Humber River Watershed, as located on property owned by the City of
Vaughan as per the Franchise Agreement with Enbridge Gas Inc. The purpose is to install NPS
2 PE IP gas pipelines in a new subdivision at 4077 Teston Road, located approximately 820
metres west of Weston Road, in the City of Vaughan. No in -water work is associated with this
project.
CFN: 65426 - Application #: 0935/211VAUG
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel1@trca.ca
Date: July 21, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within future roadways in a
new subdivision at 4333 Teston Road, located approximately 500 metres east of Pine Valley
Drive, in the City of Vaughan, Humber River Watershed, as located on property owned by a
private landowner to whom Enbridge Gas Inc. is providing service at their request and on lands
owned by the City of Vaughan as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install NPS 2 and NPS 4 PE IP gas pipelines in a new subdivision at 4333 Teston
Road, located approximately 500 metres east of Pine Valley Drive, in the City of Vaughan. No
in -water work is associated with this project.
CFN: 65427 - Application #: 0914/21NAUG
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 23, 2021
ROGERS COMMUNICATION CANADA INC.
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Major Mackenzie Drive West and Woodend Place, in the City of Vaughan, Humber
River Watershed as located on property owned by the Regional Municipality of York and the
City of Vaughan. The purpose is to install 100 millimeters (mm) high density polyethylene
(HDPE) conduits within the road right-of-way (ROW) of Major Mackenzie Drive West and
Woodened Place, in the City of Vaughan. The proposed conduit will be installed using both
trench and trenchless methods. No in -water works are within the scope of this project.
CFN: 65486 - Application #: 0991/211VAUG
Report Prepared by: Manirul Islam, extension 5715, email manirul.islam@trca.ca
For information contact: Manirul Islam, extension 5715, email manirul.islam@trca.ca
Date: August 30, 2021
TOWN OF AJAX
CPSP AJAX NOMINEE INC. C/O 12209152 CANADA LIMITED
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
on the south side of Rossland Road East, west of Carruthers Creek in the Town of Ajax,
Carruthers Creek Watershed as located on the property owned by the Town of Ajax. The
purpose is to install a 750 mm diameter pipe and an associated manhole on the south side of
Rossland Road East, west of Carruthers Creek, in the Town of Ajax. No in -water work is
associated with this project.
CFN: 65286 - Application #: 0795/21/AJAX
Report Prepared by: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
For information contact: Caroline Mugo, extension 5689, email caroline.mugo@trca.ca
Date: June 23, 2021
TOWN OF AJAX
To undertake road/pathway resurfacing or reconstruction on the northeast side of the Bayly
Street and Salem Road intersection, in the Town of Ajax, Carruthers Creek Watershed, as
located on property owned by the Regional Municipality of Durham. The purpose is to construct
a concrete bus pad and shelter on the northeast side of the Bayly Street and Salem Road
intersection, in the Town of Ajax. No in -water work is associated with this project.
CFN: 65259 - Application #: 0742/21/AJAX
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: August 13, 2021
TOWN OF CALEDON
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 15391 Mount Hope Road, located south of Old Church Road, in the Town of Caledon,
Humber River Watershed, as located on property owned by a private landowner to whom
Enbridge Gas Inc. is providing service at their request and on property owned by the Town of
Caledon as per the Franchise Agreement with Enbridge Gas Inc. The purpose is to install a
NPS 1 PE IP and a NPS 1 Steel HP gas pipeline at 15391 Mount Hope Road, located south of
Old Church Road, in the Town of Caledon. No in -water work is associated with this project.
CFN: 65256 - Application #: 0740/21/CAL
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 23, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 3598 King Street, located between Kennedy Road and Heart Lake Road, in the Town of
Caledon, Humber River Watershed, as located on property owned by a private landowner to
whom Enbridge Gas Inc. is providing service at their request and on property owned by the
Regional Municipality of Peel as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 PE IP gas pipeline at 3598 King Street, located between Kennedy
Road and Heart Lake Road, in the Town of Caledon. No in -water work is associated with this
project.
CFN: 65499 - Application #: 1036/21/CAL
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: August 20, 2021
ROBERT AND NADIA WHITE
To undertake structure maintenance on an existing structure at 16720 Humber Station Road, in
the Town of Caledon, Humber River Watershed as located on property owned by Robert and
Nadia White. The purpose is to undertake decommissioning of a dam and removal of its
associated structures at 16720 Humber Station Road, in the City of Caledon. All works will be
undertaken in dry conditions.
CFN: 65461 - Application #: 0916/21/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 20, 2021
TOWN OF MONO
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 933335 Airport Road, located south of Side Road 5, in the Town of Mono, Humber River
Watershed, as located on property owned by a private landowner to whom Enbridge Gas Inc. is
providing service at their request and on lands owned by the Town of Mono as per the
Franchise Agreement with Enbridge Gas Inc. The purpose is to install a NPS 1 PE IP gas
pipeline at 933335 Airport Road, located south of Side Road 5, in the Town of Mono. No in -
water work is associated with this project.
CFN: 65418 - Application #: 0908/21/MONO
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: July 21, 2021
TOWN OF WHITCHURCH-STOUFFVILLE
BELL CANADA
To undertake sewer and watermain or utility installation or maintenance within an existing
roadway on Lemonville, Bethesda Road, Ratcliff Road, Shalom Street and McCowan Road, in
the Town of Whitchurch-StouffviIle, Rouge River Watershed as located on the property owned
by the Town of Whitchurch-Stouffville. The purpose is to undertake installation of multi -duct
conduits on Ratcliff Road, Shalom Street, Bethesda Road and McCowan Road in the Town of
Whitch urch-Stouffville. The conduit will be installed using both open trench and trenchless
methods. No in -water works are within the scope of this project.
CFN: 65399 - Application #: 0905/21NVS
Report Prepared by: Harsha Gammanpila, extension 5629, email
harsha.gamma npila@trca.ca
For information contact: Harsha Gammanpila, extension 5629, email
harsha.gammanpila@trca.ca
Date: August 13, 2021
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 14148 Warden Avenue, located north of Bloomington Road, in the Town of Whitchurch-
Stouffville, Rouge River Watershed, as located on property owned by a private landowner to
whom Enbridge Gas Inc. is providing service at their request and on property owned by the
Regional Municipality of York as per the Franchise Agreement with Enbridge Gas Inc. The
purpose is to install a NPS 1 PE IP gas pipeline at 14148 Warden Avenue, located north of
Bloomington Road, in the Town of Whitch urch-StouffviIle. No in -water work is associated with
this project.
CFN: 64892 - Application #: 0485/211WS
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangel i@trca.ca
Date: June 17, 2021
TOWNSHIP OF KING
ENBRIDGE GAS INC.
To undertake sewer, watermain or utility installation or maintenance within an existing roadway
at 12575 Weston Road, located south of King Road, in the Township of King, Humber River
Watershed, as located on property owned by a private landowner to whom Enbridge Gas Inc. is
providing service at their request and on property owned by the Regional Municipality of York as
per the Franchise Agreement with Enbridge Gas Inc. The purpose is to install a NPS 1 PE IP
gas pipeline at 12575 Weston Road, located south of King Road, in the Township of King. No
in -water work is associated with this project.
CFN: 65254 - Application #: 0735/21/KING
Report Prepared by: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
For information contact: Madison Antonangeli, extension 5650, email
mad ison.antonangeli@trca.ca
Date: June 23, 2021
THE REGIONAL MUNICIPALITY OF YORK
To undertake road/pathway resurfacing or reconstruction on King Road from 60m east of
Dufferin Street to 50m east of Bathurst Street, in the Township of King, Humber River
Watershed as located on property owned by the Regional Municipality of York. The purpose is
to undertake road resurfacing on King Road from 60m east of Dufferin Street to 50m east of
Bathurst Street. No in -water work is associated with this project.
CFN: 64881 - Application #: 0734/21/KING
Report Prepared by: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
For information contact: Nasim Shakouri, extension 5798, email nasim.shakouri@trca.ca
Date: July 21, 2021
TOWNSHIP OF UXBRIDGE
THE REGIONAL MUNICIPALITY OF DURHAM
To undertake sewer, watermain or utility installation or maintenance within an existing roadway,
undertake sewer and watermain or utility watercourse crossing by trenchless technology along
Brock Road, from Concession Road 9 to Webb Road, in the City of Pickering and Town of
Uxbridge, Duffins Creek Watershed as located on property owned by the Regional Municipality
of Durham and the Canadian Pacific Railway. The purpose is to install new communication
conduits along Brock Road, from Concession Road 9 to Webb Road, in the City of Pickering
and Town of Uxbridge. No in -water work is associated with this project.
CFN: 64774 - Application #: 0752/21/UXB
Report Prepared by: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
For information contact: Nathan Jenkins, extension 5508, email nathan.jenkins@trca.ca
Date: August 20, 2021
MINOR WORKS LETTER OF APPROVAL FOR RECEIPT — STAFF APPROVED AND
ISSUED
Permission for Minor Works Letter of Approval are issued for works located within a regulated
area, adjacent to a natural feature or natural hazard, that do not affect the control of flooding,
erosion, dynamic beaches, pollution or the conservation of land. Permissions include ancillary
structures such as decks, garages, sheds, pools and minor fill placement/landscaping.
CITY OF BRAMPTON
44 ESKER DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 52, Plan M537, (44 Esker Drive), in the
City of Brampton, Etobicoke Creek Watershed.
CFN: 65144 - Application #: 0772/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 11, 2021
149 WHITWELL DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 16, Plan M1506, (149 Whitwell Drive), in
the City of Brampton, Humber River Watershed.
CFN: 65382 - Application #: 0958/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 27, 2021
128 LORD SIMCOE DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 64, Plan M661, (128 Lord Simcoe
Drive), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65370 - Application #: 0899/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 2, 2021
29 DONWOODS COURT
To install a swimming pool on Part Lot 15, Concession 7, (29 Donwoods Court), in the City of
Brampton, Humber River Watershed.
CFN: 65648 - Application M 1125/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 26, 2021
40 NAPERTON DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 34, Plan M1829, (40 Naperton Drive), in
the City of Brampton, Etobicoke Creek Watershed.
CFN: 65323 - Application M 0841/21113RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 24, 2021
38 DAVENHILL ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part 21 Plan
43R-33142, (38 Davenhill Road), in the City of Brampton, Humber River Watershed.
CFN: 65566 - Application M 1018/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 29, 2021
16 COOKVIEW DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 148, Plan 43M-1934, (16 Cookview
Drive), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65322 - Application M 0816/21/13RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 24, 2021
36 HIBISCUS COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 92, Plan
43M-1705, (36 Hibiscus Court), in the City of Brampton, Humber River Watershed.
CFN: 65321 - Application M 0815/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 24, 2021
30 PACIFIC WIND CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 23, Plan
43M-1025, (30 Pacific Wind Crescent), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65324 - Application M 0840/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 28, 2021
175 MORNINGMIST STREET
To install a swimming pool on Lot 63, Plan 43M-1260, (175 Morningmist Street), in the City of
Brampton, Etobicoke Creek Watershed.
CFN: 65387 - Application M 1039/21/13RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 10, 2021
27 PALI DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part 1 Lot 35, Plan 43M-1706, (27 Pali
Drive), in the City of Brampton, Humber River Watershed.
CFN: 65145 - Application M 0773/21113RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 11, 2021
26 DOCKSIDE COURT
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 57, Plan 43M-1880, (26 Dockside
Court), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65573 - Application M 1042/21/13RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 11, 2021
6 EVERLASTING COURT
To install a swimming pool on Lot 103, Plan 43M-1865, (6 Everlasting Court), in the City of
Brampton, Humber River Watershed.
CFN: 65319 - Application M 0823/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 24, 2021
13 ANDES COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 22, Plan
43M-1032, (13 Andes Court), in the City of Brampton, Humber River Watershed.
CFN: 65380 - Application M 0952/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 27, 2021
16 GEDDES LANE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5, Plan 43M
- 1866, (16 Geddes Lane), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65368 - Application M 0897/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 2, 2021
4 QUINTETTE CLOSE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 23, Plan
43M-1959, (4 Quintette Close), in the City of Brampton, Humber River Watershed.
CFN: 65376 - Application M 0918/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 12, 2021
7 LINSTOCK DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 47, Plan 43M-1394, (7 Linstock Drive),
in the City of Brampton, Humber River Watershed.
CFN: 65331 - Application M 0865/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 28, 2021
283 CHECKERBERRY CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 17, Plan
43M-1866, (283 Checkerberry Crescent), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65371 - Application M 0884/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 2, 2021
36 MADISON STREET
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 12, Part 1 Plan 43R-6468, (36 Madison
Street), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65329 - Application #: 0848/21/13RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 28, 2021
7435 MAYFIELD ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 17, Concession 9, (7435 Mayfield
Road), in the City of Brampton, Humber River Watershed.
CFN: 65645 - Application #: 1097/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 20, 2021
46 PRESSED BRICK DRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part 15 Lot 12R, Plan 43M-1175, (46
Pressed Brick Drive), in the City of Brampton, Etobicoke Creek Watershed.
CFN: 65143 - Application #: 0780/211BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 11, 2021
76 BLOOMSBURY AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on , (76 Bloomsbury
Avenue), in the City of Brampton, Humber River Watershed.
CFN: 65383 - Application #: 0999/21/BRAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: July 29, 2021
CITY OF MARKHAM
96 REEVE DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 37, Plan M-
2016, (96 Reeve Drive), in the City of Markham, Rouge River Watershed.
CFN: 65558 - Application #: 0929/21/MARK
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: July 14, 2021
CITY OF PICKERING
1941 SPRUCE HILL ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part 1 Lot 85,
Plan 40R-23946, (1941 Spruce Hill Road), in the City of Pickering, Frenchman's Bay
Watershed.
CFN: 64864 - Application #: 0859/211PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 28, 2021
2493 EARL GREY AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 1, Plan 40M-2479, (2493 Earl Grey
Avenue), in the City of Pickering, Duff ins Creek Watershed as located on the property owned by
Subashini Pirabagaran.
CFN: 65513 - Application #: 0962/211PICK
Report Prepared by: Heather Rodriguez, extension 6487, email heather. rod rig uez@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 10, 2021
CITY OF RICHMOND HILL
133 CARRINGTON DRIVE
To install a swimming pool on Lot 37, Plan 65M-2174, (133 Carrington Drive), in the City of
Richmond Hill. Don River Watershed.
CFN: 64834 - Application #: 0470/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: June 22, 2021
103 WALTER SINCLAIR COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 22, Plan
65M-4316, (103 Walter Sinclair Court), in the City of Richmond Hill, Humber River Watershed.
CFN: 65127 - Application #: 0776/211RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 12, 2021
67 RUSHINGBROOK DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 33, Plan
65M3233, (67 Rushingbrook Drive), in the City of Richmond Hill, Rouge River Watershed.
CFN: 65111 - Application #: 0682/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 12, 2021
19 PRINCETON AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 207, Plan
65M-3224, (19 Princeton Avenue), in the City of Richmond Hill, Rouge River Watershed.
CFN: 65068 - Application #: 0645/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 12, 2021
10-125 WELDRICK ROAD WEST
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 6, Plan
65R-12221, (10-125 Weldrick Road West), in the City of Richmond Hill, Don River Watershed.
CFN: 65553 - Application #: 0903/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 13, 2021
45 COCO AVENUE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 24,
Concession 2, (45 Coco Avenue), in the City of Richmond Hill, Rouge River Watershed.
CFN: 65304 - Application #: 0900/21/RH
Report Prepared by: Diane Pi, extension 5723, email diane.pi@trca.ca
For information contact: Diane Pi, extension 5723, email diane.pi@trca.ca
Date: August 17, 2021
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
109 TAYSHAM CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 317, Plan
5474, (109 Taysham Crescent), in the City of Toronto (Etobicoke York Community Council
Area), Humber River Watershed.
CFN: 65799 - Application #: 1131/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 27, 2021
50 WESTHEAD ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and change the use, size, or number of
dwelling units of a structure, or undertake work that does not change the footprint of the existing
structure on Lot 1, Plan 4177, (50 Westhead Road), in the City of Toronto (Etobicoke York
Community Council Area), Etobicoke Creek Watershed.
CFN: 65196 - Application #: 0757/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 10, 2021
88 TREELAWN PARKWAY
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 195, Plan
3309, (88 Treelawn Parkway), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 65219 - Application #: 0879/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 5, 2021
7 BEARWOOD DRIVE
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads), construct a non -
habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition or
structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 15, Plan
M-1303, (7 Bearwood Drive), in the City of Toronto (Etobicoke York Community Council Area),
Humber River Watershed.
CFN: 64082 - Application #: 1229/201TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 18, 2021
258 RENFORTHDRIVE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 170, Plan 4592, (258 Renforth Drive), in
the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed.
CFN: 65197 - Application #: 0759/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 10, 2021
26 UPMINSTER CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and construct a
ground floor addition up to 50 sq. m (538 sq. ft) on Lot 35, Plan 5057, (26 Upminster Crescent),
in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed.
CFN: 65693 - Application #: 1058/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 18, 2021
23 BEAUMONDE HEIGHTS DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 427, Plan
5475Y, (23 Beaumonde Heights Drive), in the City of Toronto (Etobicoke York Community
Council Area), Humber River Watershed.
CFN: 65198 - Application #: 0761/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 16, 2021
168 HUMBERVALE BOULEVARD
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Part Lot 4, Concession RANGE 1, (168
Humbervale Boulevard), in the City of Toronto (Etobicoke York Community Council Area),
Mimico Creek Watershed.
CFN: 65696 - Application #: 1090/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 24, 2021
14 BEARWOOD DRIVE
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 11, Plan M-1303, (14 Bearwood Drive), in the City of Toronto (Etobicoke York
Community Council Area), Humber River Watershed.
CFN: 65201 - Application #: 0770/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 16, 2021
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
392 KEEWATIN AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a ground floor addition or
structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 37, Plan
M-146, (392 Keewatin Avenue), in the City of Toronto (North York Community Council Area),
Don River Watershed.
CFN: 64436 - Application #: 0171/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: August 17, 2021
202 TAVISTOCK ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 316, Plan M-
799, (202 Tavistock Road), in the City of Toronto (North York Community Council Area),
Humber River Watershed.
CFN: 63660 - Application #: 0842/201TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 27, 2021
36 SAINTFIELD AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 53, Plan M-809, (36 Saintfield Avenue),
in the City of Toronto (North York Community Council Area), Don River Watershed.
CFN: 65519 - Application #: 0893/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 13, 2021
436 BROOKDALE AVENUE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 24, Plan
2371, (436 Brookdale Avenue), in the City of Toronto (North York Community Council Area),
Don River Watershed.
CFN: 64980 - Application #: 0626/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 14, 2021
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
55 WANDERING TRAIL
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 84, Plan 66M-2228, (55 Wandering Trail), in the City of Toronto (Scarborough
Community Council Area), Rouge River Watershed.
CFN: 65203 - Application #: 0788/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 18, 2021
28 CRESCENTWOOD ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 152, Plan 1902, (28 Crescentwood Road), in the City
of Toronto (Scarborough Community Council Area), Waterfront Watershed as located on the
property owned by Neal Bilow and Carmina Calderon.
CFN: 65509 - Application #: 0923/211TOR
Report Prepared by: Heather Rodriguez, extension 6487, email heather. rod rig uez@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 12, 2021
75 GRACKLE TRAIL
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) and change the
use, size, or number of dwelling units of a structure, or undertake work that does not change the
footprint of the existing structure on Lot 101, Plan 66M-2407, (75 Grackle Trail), in the City of
Toronto (Scarborough Community Council Area), Rouge River Watershed.
CFN: 65206 - Application #: 0789/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 14, 2021
18 KINGSBURY CRESCENT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 57, Plan
1538, (18 Kingsbury Crescent), in the City of Toronto (Scarborough Community Council Area),
Waterfront Watershed.
CFN: 65202 - Application #: 0787/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 28, 2021
UNIVERSITY OF TORONTO
To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than
150 sq. m (1614 sq. ft) on Part Lot 9, 10, Concession 1, (130 Old Kingston Road), in the City of
Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the
property owned by University of Toronto.
CFN: 65188 -Application #: 0731/21/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark. rapus@trca.ca
Date: June 30, 2021
2 ROMANA DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 77, Plan
4035, (2 Romana Drive), in the City of Toronto (Scarborough Community Council Area),
Waterfront Watershed.
CFN: 65200 - Application #: 0769/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 18, 2021
CITY OF TORONTO (TORONTO AND EAST YORK COMMUNITY COUNCIL AREA)
87 HIGHLAND AVENUE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and construct a ground floor addition up to 50 sq. m (538
sq. ft) on Part Lot 53, Plan 528 YORK, (87 Highland Avenue), in the City of Toronto (Toronto
and East York Community Council Area), Don River Watershed.
CFN: 65676 - Application #: 0986/211TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 23, 2021
215 AVA ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a
structure, or undertake work that does not change the footprint of the existing structure on Lot
183, 184, 185, Plan 2339 -YORK, (215 Ava Road), in the City of Toronto (Toronto and East York
Community Council Area), Don River Watershed.
CFN: 63139 - Application #: 0412/201TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: July 22, 2021
121 GLENDONWYNNE ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 82, 83, Plan
M-501, (121 Glendonwynne Road), in the City of Toronto (Toronto and East York Community
Council Area), Humber River Watershed.
CFN: 65538 - Application #: 0973/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: July 28, 2021
26 PAPE AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on 26 Pape Avenue, in the City of Toronto
(Toronto and East York Community Council Area), Don River Watershed.
CFN: 65682 -Application #: 1015/21/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: August 4, 2021
CITY OF VAUGHAN
137 ROSELAWN DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 19, Plan
65M-2809, 137 Roselawn Drive, in the City of Vaughan, Humber River Watershed.
CFN: 65769 - Application #: 1074/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh.razavi@trca. ca
Date: August 24, 2021
160 FARRELL ROAD
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 91, Plan 65M4425, 160 Farrell Road, in the City of Vaughan, Don River
Watershed.
CFN: 65365 - Application #: 0863/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: July 7, 2021
90 CHARLES COOPER COURT
To install a swimming pool on Lot 5, Plan 65M-3043, 90 Charles Cooper Court, in the City of
Vaughan, Humber River Watershed.
CFN: 65355 - Application #: 0836/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh.razavi@trca. ca
Date: July 7, 2021
67 WORTHVIEW DRIVE
To install a swimming pool on Lot 92, Plan 65M-3927, 67 Worthview Drive, in the City of
Vaughan, Humber River Watershed.
CFN: 65348 - Application #: 0821/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: July 7, 2021
2035 HIGHWAY 7
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 5,
Concession 3, 2035 Highway 7, in the City of Vaughan, Don River Watershed.
CFN: 65308 - Application #: 0785/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: June 23, 2021
264 STORMONT TRAIL
To install a swimming pool on Part Lot 22, Concession 6, 264 Stormont Trail, in the City of
Vaughan, Humber River Watershed as located on the property owned by Ekaterina Simans.
CFN: 65312 - Application #: 0820/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: June 23, 2021
190 MATTUCCI COURT
To install a swimming pool and construct a non -habitable accessory structure up to 50 sq. m
(538 sq. ft) on Lot 16, Plan 65M-3001, 190 Mattucci Court, in the City of Vaughan, Humber
River Watershed.
CFN: 65311 - Application #: 0819/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: June 29, 2021
478 GLENKINDIE AVENUE
To install a swimming pool on Lot 85, Plan 65M-3022, (478 Glenkindie Avenue), in the City of
Vaughan, Don River Watershed.
CFN: 65758 - Application M 1047/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: August 12, 2021
66 ARTIST VIEW AVENUE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 3, Plan
65M-4371, 66 Artist View Avenue, in the City of Vaughan, Humber River Watershed.
CFN: 65547 - Application M 0887/21NAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: July 7, 2021
47 DEL FRANCESCO WAY
To install a swimming pool on Lot 109R, Plan 65M-3623, 47 Del Francesco Way, in the City of
Vaughan, Don River Watershed.
CFN: 65301 - Application M 0771/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh.razavi@trca. ca
Date: June 12, 2021
288 FARRELL DRIVE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 21,
Concession 2, (288 Farrell Drive), in the City of Vaughan, Don River Watershed.
CFN: 65545 - Application M 0886/21/VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: July 7, 2021
12 HUMBERVIEW DRIVE
To install a swimming pool on Lot 19, Concession 8, 12 Humberview Drive, in the City of
Vaughan, Humber River Watershed.
CFN: 65297 - Application M 0758/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh.razavi@trca. ca
Date: June 12, 2021
WILLOWGATE HOLDINGS INC.
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and construct a non -habitable accessory
structure up to 50 sq. m (538 sq. ft) on Lot 24, Concession 8, 45 Napier Street, in the City of
Vaughan, Humber River Watershed as located on the property owned by Willowgate Holdings
Inc.
CFN: 65367 - Application M 0885/211VAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
hamedeh. razavi@trca. ca
Date: July 7, 2021
TOWN OF AJAX
14 BETTS ROAD
To install a swimming pool on Lot 28, Plan 40M1749, (14 Betts Road), in the Town of Ajax,
Duffins Creek Watershed.
CFN: 64861 - Application M 0730/21/AJAX
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: June 10, 2021
124 ELIZABETH STREET
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Block 15, Plan
40M2160, (124 Elizabeth Street), in the Town of Ajax, Duffins Creek Watershed.
CFN: 65505 - Application M 0894/211AJAX
Report Prepared by: Heather Rodriguez, extension 6487, email heather. rod rig uez@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 20, 2021
TOWN OF CALEDON
60 SUNKIST VALLEY ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 33, Plan
43M-1159, (60 Sunkist Valley Road), in the Town of Caledon, Humber River Watershed.
CFN: 65130 - Application M 0689/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 9, 2021
42 GENTLE FOX DRIVE
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 21, Plan
43M-1845, (42 Gentle Fox Drive), in the Town of Caledon, Etobicoke Creek Watershed.
CFN: 65328 - Application #: 0945/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 22, 2021
15534 MOUNT PLEASANT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 18, Plan
43R-22866, (15534 Mount Pleasant), in the Town of Caledon, Humber River Watershed.
CFN: 65326 - Application #: 0843/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 22, 2021
8 ELLA COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 4,
Concession 6 EHS, (8 Ella Court), in the Town of Caledon, Humber River Watershed.
CFN: 65129 - Application #: 0663/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 9, 2021
54 DEER RIDGE TRAIL
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 3, Plan M2071, (54 Deer Ridge Trail), in
the Town of Caledon, Etobicoke Creek Watershed.
CFN: 65041 - Application #: 0688/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 10, 2021
36 ELITE ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 14, Plan 998, (36 Elite Road), in
the Town of Caledon, Humber River Watershed.
CFN: 65136 - Application #: 0699/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 9, 2021
7873 MILL LANE
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads), construct a ground floor addition or
structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) and change the
use, size, or number of dwelling units of a structure, or undertake work that does not change the
footprint of the existing structure on Part Lot 22, Concession 2, (7873 Mill Lane), in the Town of
Caledon. Humber River Watershed.
CFN: 65330 - Application #: 0847/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 22, 2021
56 MORRA AVENUE
To change the use, size, or number of dwelling units of a structure, or undertake work that does
not change the footprint of the existing structure on Lot 7, Plan 43M-2026, (56 Morra Avenue),
in the Town of Caledon, Humber River Watershed.
CFN: 65058 - Application #: 0860/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 7, 2021
8 BLUEBERRY HILL COURT
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 4, Plan 43M-
1219, (8 Blueberry Hill Court), in the Town of Caledon, Humber River Watershed.
CFN: 65148 - Application #: 0781/21/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 17, 2021
39 ENGLISH ROSE LANE
To install a swimming pool on Lot 34, Plan 43M1374, (39 English Rose Lane), in the Town of
Caledon, Humber River Watershed.
CFN: 65147 - Application #: 0747/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 9, 2021
16794 INNIS LAKE ROAD
To install a swimming pool on (16794 Innis Lake Road), in the Town of Caledon, Humber River
Watershed.
CFN: 65320 - Application M 0814/21/CAL
Report Prepared by: Jason Wagler, extension 5370, email jason.wagler@trca.ca
For information contact: Jason Wagler, extension 5370, email jason.wagler@trca.ca
Date: June 23, 2021
14065 KENNEDY ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) and undertake a municipal or utility
project on Lot 28, Concession 2, (14065 Kennedy Road), in the Town of Caledon, Humber River
Watershed.
CFN: 65137 - Application M 0717/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 9, 2021
6 OLD HICKORY COURT
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 14, Plan
43M-1134, (6 Old Hickory Court), in the Town of Caledon, Humber River Watershed.
CFN: 65568 - Application #: 1075/21/CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: August 19, 2021
TOWN OF WHITCHURCH-STOUFFVILLE
87 SPOFFORD DRIVE
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 30, Plan
65M-4598, (87 Spofford Drive), in the Town of Whitch urch-StouffviIle, Rouge River Watershed.
CFN: 65354 - Application M 0824/21/WS
Report Prepared by: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
For information contact: Dan Nguyen, extension 5306, email dan.nguyen@trca.ca
Date: June 28, 2021
TOWNSHIP OF KING
46 PARADISE VALLEY TRAIL
To install a swimming pool on Lot 24, Plan 65M-4366, (46 Paradise Valley Trail), in the
Township of King, Humber River Watershed.
CFN: 65298 - Application M 0767/21/KING
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: June 11, 2021
193 CARMICHAEL CRESCENT
To install a swimming pool, undertake minor landscaping involving the placement, removal or
regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a
non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 65M-4524, (193
Carmichael Crescent), in the Township of King, Humber River Watershed.
CFN: 65356 - Application #: 0864/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 6, 2021
3045 15TH SIDEROAD
To install a swimming pool and undertake minor landscaping involving the placement, removal
or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 10,
Concession 5, (3045 15th Sideroad), in the Township of King, Humber River Watershed.
CFN: 65303 - Application #: 0748/21/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 11, 2021
40 CRESTVIEW ROAD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 7, Plan 518,
(40 Crestview Road), in the Township of King, Humber River Watershed.
CFN: 65302 - Application #: 0749/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: June 24, 2021
126 BURNS BOULEVARD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 6, Plan 65M-
4342, (126 Burns Boulevard), in the Township of King, Humber River Watershed.
CFN: 65546 - Application #: 0959/21/KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 26, 2021
128 BURNS BOULEVARD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 5, Plan 65M-
4342, (128 Burns Boulevard), in the Township of King, Humber River Watershed.
CFN: 65360 - Application #: 0844/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 22, 2021
124 BURNS BOULEVARD
To construct a non -habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 7, Plan 65M-
4342, (124 Burns Boulevard), in the Township of King, Humber River Watershed.
CFN: 65362 - Application #: 0849/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: August 5, 2021
58 HAWTHORNE VALLEY ROAD
To undertake minor landscaping involving the placement, removal or regrading of material of
less than 30 cubic metres (equivalent to 3 truckloads) on Lot 13, Concession 8, (58 Hawthorne
Valley Road), in the Township of King, Humber River Watershed.
CFN: 65125 - Application #: 0846/211KING
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 21, 2021
PERMITS AFTER THE FACT / RESOLUTION OF VIOLATIONS FOR RECEIPT — STAFF
APPROVED AND ISSUED
Permission for works undertaken without the benefit of a TRCA permit in a regulated area,
where such works comply with TRCA policies and procedures, are considered permits after the
fact and subject to an additional administrative fee.
CITY OF BRAMPTON
38 OAKHAVEN ROAD - Humber River Watershed
The purpose is to recognize the construction of a 26.86 sq.m. (289.11 sq.ft.) deck and patio
located to the back of the existing house within TRCA's Regulated Area of the Humber River.
The works were constructed on 38 Oakhaven Road, in the City of Brampton without the benefit
of TRCA permit.
CFN: 65572 - Application #: 1041/21113RAM
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 10, 2021
CITY OF MISSISSAUGA
1129 HIGHGATE PLACE - Etobicoke Creek Watershed
The purpose is to recognize the construction of a 25.66 sq.m. (276.25 sq.ft.) sunroom attached
to rear of the second storey of the existing house within TRCA's Regulated Area of the
Etobicoke Creek Watershed. The works were constructed on 1129 Highgate Place, in the City
of Mississauga without the benefit of TRCA permit.
CFN: 64579 - Application #: 0310/21/MISS
Report Prepared by: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
For information contact: Lina Alhabash, extension 5657, email lina.alhabash@trca.ca
Date: August 13, 2021
CITY OF PICKERING
275 UXBRIDGE-PICKERING TOWNLINE - Duffins Creek Watershed
The purpose is to continue construction of the north and south side additions to the existing
detached garage at 275 Uxbridge -Pickering Townline in the City of Pickering.
CFN: 64854 - Application #: 0641/211PICK
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Steve Heuchert, extension 5311, email steve.heuchert@trca.ca
Date: July 13, 2021
CITY OF TORONTO (ETOBICOKE YORK COMMUNITY COUNCIL AREA)
65 OAKFIELD DRIVE - Mimico Creek Watershed
The purpose is to develop within a TRCA Regulated Area of the Mimico Creek watershed in
order to permit, after the fact, the as -built side and rear deck at 65 Oakfield Drive in the City of
Toronto (Etobicoke York Community Council Area).
CFN: 62109 - Application #: 0972/19/TOR
Report Prepared by: Daniel Pina, extension 5250, email daniel.pina@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 3, 2021
CITY OF TORONTO (NORTH YORK COMMUNITY COUNCIL AREA)
2 BRENDAN ROAD - Don River Watershed
The purpose is to permit and continue construction of a replacement sunroom at the rear of the
existing dwelling at 2 Brendan Road in the City of Toronto (North York Community Council).
CFN: 65543 - Application #: 0984/211TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: August 24, 2021
115 RIVERVIEW DRIVE - Don River Watershed
The purpose is to legalize the construction of a cabana and additional hardscaping in the rear
yard of the existing dwelling at 115 Riverview Drive in the City of Toronto (North York
Community Council Area). An extension to the as -built cabana is now proposed.
CFN: 63367 - Application #: 0616/20/TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: July 22, 2021
DON MILLS (ARH) HOMES LTD. - Don River Watershed
The purpose is to undertake works within TRCA's Regulated Area of the Don River watershed in
order to facilitate the excavation and shoring for of 1150 Eglinton Avenue East - Block 12 in the
City of Toronto (North York Community Council Area). The works are to be approved in multiple
phases.
CFN: 64624 - Application #: 0314/211TOR
Report Prepared by: Anna Lim, extension 5284, email anna.lim@trca.ca
For information contact: Anna Lim, extension 5284, email anna.lim@trca.ca
Date: June 9, 2021
CITY OF TORONTO (SCARBOROUGH COMMUNITY COUNCIL AREA)
5 CRESCENTWOOD ROAD - Waterfront Watershed
The purpose is to legalize the construction of a patio in the rear yard of the existing dwelling at 5
Crescentwood Road in the City of Toronto (Scarborough Community Council Area).
CFN: 56579 - Application #: 1086/16/TOR
Report Prepared by: Terina Tam, extension 6431, email terina.tam@trca.ca
For information contact: Mark Rapus, extension 5259, email mark.rapus@trca.ca
Date: June 15, 2021
CITY OF VAUGHAN
12 WOODVIEW ROAD - Humber River Watershed
The purpose is to recognize the recent construction of a 2.1 metre (7 feet) high replacement
retaining wall within TRCA's Regulated Area of the Humber River Watershed. The subject
property is located on lands known municipally as 12 Woodview Road, in the City of Vaughan.
The described works were constructed without a TRCA permit. As such, the applicant has paid
double the application fee as required for voluntary compliance related to the resolution of a
violation of Ontario Regulation 166/06.
CFN: 65630 - Application #: 1007/21NAUG
Report Prepared by: Hamedeh Razavi, extension 5256, email hamedeh.razavi@trca.ca
For information contact: Hamedeh Razavi, extension 5256, email
h amedeh. razavi@trca. ca
Date: July 28, 2021
TOWN OF CALEDON
15816 MOUNT PLEASANT ROAD - Etobicoke Creek Watershed
The purpose is to recognize the construction of a 4.88 m by 9.76 m (16 ft by 32 ft) deck, 32.7
sq. m. (351.99 sq. ft.) shed and driveway to the shed located at the south east side of an
existing dwelling within TRCA's Regulated Area of the Humber River Watershed. The works
were constructed at 15816 Mount Pleasant Road, in the Town of Caledon without the benefit of
TRCA or municipal permits. As such, an additional application fee of 100% was charged for this
"after -the -fact" permit.
CFN: 65372 - Application #: 0924/211CAL
Report Prepared by: Andrea Terella, extension 6447, email andrea.terella@trca.ca
For information contact: Andrea Terella, extension 6447, email andrea.terella@trca.ca
Date: July 12, 2021
TOWN OF CALEDON - Humber River Watershed
The purpose is to undertake emergency repair works on a failed storm sewer at 62 Sherin
Court. This project was reviewed in accordance with the TRCA Permission for Emergency
Infrastructure Works Review Protocol (Authority Res. #A105/15).
CFN: 64270 - Application #: 0042/21/CAL
Report Prepared by: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
For information contact: Shirin Varzgani, extension 5785, email shirin.varzgani@trca.ca
Date: July 9, 2021
CLOSED SESSION
SUPPLEMENTARY COMPENSATION AND PAY EQUITY REVIEW
Moved by: Linda Jackson
Seconded by: Joanne Dies
THE EXECUTIVE COMMITTEE RECOMMENDS THAT the confidential item 11.1 —
Supplementary Compensation and Pay Equity Review be approved.
ADJOURNMENT
ON MOTION by Jennifer Drake, the meeting was adjourned at 9:55 a.m., on Friday, September
10, 2021.
Jennifer Innis
Chair
/am
John MacKenzie
Secretary -Treasurer