Loading...
HomeMy WebLinkAboutEtobicoke-Mimico Advisory Board 1975 , ^-r-~^~;z.-r~/;-~~ /~ x J\)(7S'A7(-~. )7-' 11' nile M l\'.: \bn0 jf)J~ (\)) ll'(()) llil1l:<lJ> ;;1,RiI <<ll Jm l\'.:~fi <lJ> 1l'iI /" " X "<"'/YXy,,, / " / lC~ffil~elf~ral1:li<D>lTI\ j~\'MfJ:J1i(\))rriUtSf. / >{)!x\!' / ~ ~ M JI IN lLflr'lE, ~ XL2<X~ Etobicoke-Mimico Advisory Board Tuesday-November-18-1975 #1/75 -- ------- - - --.-----. ---- -----~-_. -- ---~----------- ---- ---_._------ The Etobicoke-Mimico Advisory Board met at the Authority Office, 5 Shoreham Drive, Downsview, on Tuesday, November 18, 1975, commenc- ing at 10:00 a.m, PRESENT WERE Chairman C,F, Kline Members G. Lowe J.G, Mottershead G.B, Sinclair Chairman of the Authority R,G. Henderson Secretary-Treasurer F.L. Lunn Director of Operations K,G. Higgs Adm, - FC&WC Division E,F. Sutter ABS!2:!1' WERE Vice Chairman Mr-s, N. Pownall Members M.J. Breen J, Carroll D,J. Culham Dr, M,L, Dobkin F,J. McKechnie MINUTES TILe Minutes of Meetings #1/73 and #1/74 were presented. Res, #1 Moved by: J.G. Mottershead Seconded by: G,B. Sinclair RESOLVED THAT: The Minutes of Meetings #1/73 and #1/74, as presented, be adopted, CARRIED UNANIMOUSLY; STAFF PROGRESS REPORT The staff presented a detailed Progress Report to date. Res. #2 Moved by: G. Lowe Seconded by: J.G. Mottershead RESOLVED THAT: TILe Staff Progress Report, January 1 to October 31, 1975, be received with appreciation and filed, CARRIED UNANIMOUSLY; ETOB+COKE CREEK LINEAR PARK CONCEPT - Status Report A staff con~unication having regard to progress in connection with the Etobicoke Creek, Park Potential, was presented for information, Res, tF3. Moved by: G.B. Sinclair Seconded by: J.G. Mottershead RESOLVED THAT: TILe Staff Report on the Etobicoke Creek Linear Park Concept, be received und filed. CARRIED UNANIMOUSLY; . ~ f L-2 -2- SNELGROVE Dt~ & RESERVOIR PROJECT , , . - Status R.C12or..!:- Mr. Sutter presented a verb~l report on the status of the Snelgrove Dam & Reservoir Project. Res. 1f4 Moved by: J.G. Mottershead Seconded by: G, Lowe RESOLVED 'I'H1\T: The report on the status of the Snelgrove Dam and Reservoir Project, as presented, be received, CARRIED UNANIMOUSLY; COST BENEFIT REPORT ETOBICOKE RIVER Res, #5 Moved by: G.B. Sinclair Seconded by: G. Lowe 'IRE BOARD RECOMMENDS THAT: The staff be requested to prepare a flood damage forecast of the Etobicoke River, indicating values of preventive measures, CARRIED UNANIMOUSLY; AUTHORITY POLICY RE OWNERSHIP OF LAND ON WHICH WORKS ARE CARRIED OUT -- IT WAS AGREED THAT the staff provide Mr, G.B. Sinclair with the Statement of Policy regarding the ONnership of Land on which works of the Authority are constructed. ADJOURNMEN':S On Motion, the Meeting adjourned at 11:35 a.m" November 18, C.F. Kline F,L. Lunn - Chairman Secretary-Treasurer .