HomeMy WebLinkAboutEtobicoke-Mimico Advisory Board 1976
/"}
~~
\::-..,.
- ',,- L-l
:;h'" ,
@'
.' /'-
1',/ : -
\
the metropolitan toronto and region conservation authority
minutes
ETOBICOKE-MIMICO ADVISORY BOARD FRIDAY-MAY-2l-1976 #1/76
, The Etobicoke-Mimico Advisory Board met at the Authority Office,
5 Shoreham Drive, Downsview, on Friday, May 21, 1976, commencing at
10:00 a.m.
PRESENT WERE
Chairman C.F. Kline
Vice Chairman F.J. McKechnie
Members M.J. Breen
J. Carroll
G. Lowe
Mrs. N. Pownall
G. B. Sinclair
Chairman of the Authority R.G. Henderson
Special Adviser F.L. Lunn
Head, Flood Control Section J .C. Mather
Project Engineer, Development A. Sahabandu
Project Planner T.E. Farrell
Project Biologist I.- Macnab
ABSENT WERE
Members Dr. M.L. Dobkin
J.G. Mottershead
R.A. Searle
MINUTES
The Minutes of Meeting ff:l/75 were presented.
Res. #l Moved by: G. Lowe
Seconded by: M.J. Breen
RESOLVED THAT: The Minutes of Meeting ~l/75, as presented, be adopted.
CARRIED;
STAFF PROGRESS REPORT
A comprehensive Staff Progress Report was presented and discussed in
some detail.
Res. #2 Moved by: G.B. Sinclair
Seconded .by: F.J. McKechnie
RESOLVED THAT: The Staff Progress Report be received with appreciation.
CARRIED;
EROSION CONTROL - ETOBICOKE -
BLOOR STREET TO BURNHAMTHORPE RD.
Mr. McKechnie brought to the attention of the Board certain erosion
problems between Bloor Street and Burnhamthorpe Road.
/
I
I
\
\.
L-2 -2-
Re s :.-If.l Moved by: F.J. IvlcKechnie
Seconded by: G. Lowe
THE BOARD RECOMMENDS TI~T: The staff study and provide a report for
the next meeting of the erosion areas on the Etobicoke from Bloor
Street upstream to Burnhamthorpe Road,
CARRIED;.
E'rOBICOKE LINEAR PARK CONCEPT
- Status Report
'rhe staff presented a Progress Report on the present status of the
Etobicoke Linear Park Study and advised that the complete Study Report
should be available shortly.
Res. #4 Moved by: F.J. McKechnie
Seconded by: G. LO\.,re
RESOLVED THP.T: The Staff Progress Report en the Proposed Linear Park
be received.
CARRIED;
ETOBICOKE CREEK - LINEAR PARK
- Proposed Extension
Mr. McKechnie suggested that the proposed Linear Park eventually be
extended, upstream to the boundary of The City of Brampton,
Res. #5 Moved by: F.J. McKechnie
Seconded by: M.J. Breen
THE BOARD RECOMMENDS THA T: The staff be directed to study the
possibility of extending the proposed Etobicoke Linear Park upstream
to the boundary of The City of Brampton and submit a report thereon.
CARRIED;
PROJECT W.C.60 - EROSION CONTROL
AND BANK STABILIZATION IN METRO
TORONTO; lO-YEAR PROGRAMME AND
5-YEAR PROJECT: Etobicoke-Mimico
Priorities
The staff presented a Progress Report on Project W.C.60 Priorities on
the Etobicoke & Mimico Creeks.
.
Res. #6 Moved by: G.B. Sinclair
Seconded by: F.J. McKechnie
RESOLVED THAT: The Staff Report re W.C.60 on the Etobicoke and Mimico
be received and the Board be kept advised of any major changes in the
works presently proposed for 1976-l977.
CARRIED;
ETOBICOKE CREEK FLOOD PLAIN LANDS
TORONTO INTERNATIONAL AIRPORT
-
The alleged filling of Etobicoke Flood Plain within the boundary of
the Toronto International JI.irport was discussed.
Res, #7 Moved by: F.J. McKechnie
Seconded by: G. B. Sinclair
THE nO^RD RECOMMENDS ~HAT: A meeting be sought with the appropriate
Hinister of The Government of Canada and representatives of the
Executi ve Committee - ')1.1e Ci ty of Mississauga and the Borough of
Etobicoke to request the present filling operation said to be taking
-3- L-3
place on the flood plain of the Etobic~<e within the boundaries of
the Toronto Internationul Airport be stopped or properly controlled.
CARRIED;
FLOOD CONTROL PLAN REVIEW
SNELGROVE DAM & RESERVOIR
A Staff Report was presented advising that the proposals for construct-
ion of the Snelgrove Dam & Reservoir are included in the Flood Control
Plan Review to be carried out in the coming year.
The proposals included in the Flood Control Plan Review were discussed
in some detail; and
IT WAS AGREED THAT the flood damage forecast of the Etobicoke Creek
indicating values of preventive measures could also be included in the
overall review.
Res. #8 Moved by: G. Lowe
Seconded by: G. B. Sinclair
THE BOARD RECOMMENDS THAT: Proposals for the construction of the
Snelgrove Dam and Reservoir and a flood damage forecast of the
Etobicoke Creek indicating values of protective measures be included
in and given a high priority in the overall Flood Control Plan Review.
CARRIED;
FALL MEETING
IT WAS AGREED THAT a Fall meeting of the Board be held on Friday,
October 22, 1976, commencing at lO:OO a.m.
ADJOURNMENT
On Motion, the Meeting adjourned at ll:57 a.m., May 2l.
e.F. Kline K.G. Hiqqs
Chairman Secretary-Treasurer
.