minutes
---. - ~ .
FLOOD CONTROL & WATER CONS.ADV. BOARD TUESDAY-APRIL~27-l976 #1/76
The Flood Control and Water Conservation Advisory Board met at the
Authority Office, 5 Shoreham Drive, Downsview, on 'fuesday, April 27,
1976, commencing at 2:00 p.m.
PRESENT WERE
Chairman. J. Carroll
Vice Chairman Wm. R. Herridge, Q.C.
Members R. Cunningham
C. F. Kline
F.J. McKechnie
J.G. Mottershead'
H. westney
Vice Chairman of the Authority Mrs. F. Gell
Secretary-Treasurer K.G. Higgs
Adm. - Water Resource Division M.R. Garrett
Water Resource Division C. Mather
Water Resource Division A. Sahabandu
Planning & Policy J. Maletich
Representative Ministry of Environment
ABSENT WERE
Members Dr. M.L. Dobkin
E.V. Kolb
H.C. Lawrie
Dr. G. Ross Lord, P.Eng.
J. Sewell
MINUTES
The Minutes of Meeting ~l/75 were presented.
Res. ~l Moved by: C.F. Kline
Seconded by: F.J. McKechnie
RESOLVED THAT: The Minutes of,Meeting ##=l/75, as presented, be adopted,
CARRIED;
REORGANIZATION OF THE WATERFRONT DIVISION
AND THE FLOOD CONTROL AND \vATER CONSERVAT-
ION DIVISION
Mr. Higgs outlined in detail the reorganization of the Waterfront
Division and the Flood Control and Water Conservation Division and the
establishment of the Water Resource Division. The duties and re-
sponsibilities of the Waterfront Section and the Flood Control Section
of the Water Resourc~ Division were discussed and the senior staff
members of the two Sections introduced. The role of the Planning
Section was outlined and the two senior staff members in this Section
introduced. Mr. Higgs further advised that the Land Use Coordination
function previously in the Flood Control and Water Conservation
Division had been transferred to Planning and Policy, and the
Development Coordinator was introduced.
Res. 11=2 Moved by: J.G. Mottershead
Seconded by: Wm. R. Herridge, Q,C.
C-2 -2-
RESOLVED THAT: The Report on the reorganization of the Waterfront
Division and the Flood Control and Water Conservation Division be
received for information.
CARRIED;
Res. #3 Moved by: Wm. R. Herridge, Q.C.
Seconded by: J.G. Mottershead
THE BOARD RECOMMENDS THAT: 'f.he Recommendation of the Personnel Sub-
Committee (Report #1/76) regarding a staff review of the positions
in the Water Resource Division to be completed prior to the end of
1976, be considered at the next regular meeting of the Flood Control
and Water Conservation Advisory Board, scheduled for September 23, 1976.
CARRIED;
ADMINISTRATION OF AUTHORITY REGULATIONS
RELATING TO FILL AND THE CONSTRUCTION
AND ALTERATIONS TO WATERWAYS
Mr. Maletich, Development Coordinator, outlined in detail the procedures
of the Authority relating to the Administration of Authority Regulations
relating to Fill and the Construction and Alterations to Waterways.
PROJECT W.C.60 - EROSION CONTROL
AND BANK STABILIZATION IN METRO
TORONTO; la-YEAR PROGRAMME AND
S-YEAR PROJECT
Mr. Sahabandu presented a report on priorities and proposed remedial
work sites for 1976-l978 for Project W.C.60 - Erosion Control and Bank
Stabilization in Metropolitan Toronto; la-Year Progranune and S-Year
Project.
Res. #4 Moved by: C.F. Kline
Seconded by: F.J. McKechnie
RESOLVED 'IHAT: The report on priorities and proposed remedial work
sites proposed for 1976-l978 - Project W.C.60 - Erosion Control and
Bank Stabilization in Metropolitan Toronto; 10-Year Progranune and
5-Year Project, be received and appended as Schedule II All of these
Minutes.
CARRIED;
PRELIMINARY BUDGET ESTIMATES 1977
The 1977 Preliminary Development Budget Estimates were presented and
discussed.
Res. #5 Moved by: R. Cunningham
Seconded by: C.F. Kline
RESOLVED THAT: The 1977 Preliminary Development Budget Estimates be
approved in principle; and further
THE BOARD RECOMMENDS 'I'llAT: The 1976 Preliminary Development Budget
Estimates, as appended as Schedule "BII of. these Minutes, be included
in the 1977 Preliminary Budget Estimates of the Authority.
CARRIED;
EROSION CONTROL ETOBICOKE CREEK
MAlli<LAND WOOD GOLF & COUNTRY CLUB
Res. #6 Moved by: F.J. McKechnie
Seconded by: C. F. I<line
THE BOARD RECOMMENDS THAT: Consideration be given to the completion
of eros.ion control works on the Etobicoke Creek in the vicinity of
-3- C-3
the Markland Woods Golf and Country Club in 1977; and that it be
included under other erosion control projects included in the
Preliminary 1977 Budget Estimates.
CARRIED;
FLOOD WARNING SYSTEM -
PROPOSED RADIO COMMUNICATIONS
Mr. Mather presented a report on the Flood Warning System - Proposed
Radio Communications.
Res. #7 Moved by: F.J. McKechnie
Seconded by: WIn. R. Herridge
RESOLVED 'THAT: The staff communication having regard to the Flood
Warning System and proposed radio communications be received; and
THE BOARD RECOMMENDS THAT: The staff be requested to pursue the
establishment of a radio communications system; and
THAT George Mather & Associates, Consultants, be retained to provide
necessary technical information and to review proposals obtained from
the suppliers, at a cost not to exceed $l,OOO.OO.
CARRIED;
DRAFT FLOOD CONTROL PLAN REVIEW
Mr. Garrett, Administrator, Water Resource Division, outlined a draft
proposal' for the Flood Control Plan Review.
Res. ~8 Moved by: F.J. McKechnie
Seconded by: J.G. Mottershead
RESOLVED THAT: The draft Flood Control Plan Review be received and
appended as Schedule "C" of these Minutes.
CARRIED;
FLOOD CONTROL REVIEW
MIMICO CREEK
Res. ff:9 Moved by: F.J. McKechnie
Seconded by: C.F. Kline
THE BOARD RECOMMENDS THAT: The City of Brampton be requested to defer
any amendments to its Official Plan in the upper reaches of the Mimico
Creek watershed until such time as a comprehensive review of flood
control and water management measures is completed to determine the
effects of the proposed Official Plan amendments; and further
THAT copies of this recommendation be forwarded to The City of Brampton,
City of Mississauga, Borough of Etobicoke and The Regional Municipality
of Peel.
CARRIED;
FILLING OF ETOBICOKE CREEK
VALLEY - TORONTO INTERNATIONAL
AIRPORT
The staff was directed to write the appropriate officials and Ministers
of The Government of Canada regarding the placing of fill in the Etobicoke
Creek valley within the Toronto International Airport area.
DRAFT PLAN OF SUBDIVISION T75482
RIVERWOOD VILLAGE - WEST BRANCH
ffiJMI3ER RIVER
A discussion took place regarding a draft Plan of Subdivision, Riverwood
villa.ge, West Branch of the Humber River, Borough of Etobicoke, including
the suggested collector road adjacent to the west branch of the Humber
River. Mr. Maletich advi~ed the Board Members that the staft had
C-4 -4-
recommended that the AU~1ority be given the opportunity to review
the precise details and location of the proposed collector road and
river crossing, prior to the finalization of the draft Plan.
Res. #10 Moved by: Wm. R. Herridge, Q.C.
Seconded by: R. Cunningham
THE BOARD RECOMMENDS THAT: The Borough of Etobicoke be advised of
the concerns of the Authority with respect to the location of the
proposed collector road and river crossing adjacent to the West
Branch of the Humber River, Riverwood Village, Draft Plan of
Subdivision '1'75482.
CARRIED;
ADJOURNMENT
On Motion, the Meeting adjourned at 5:35 p.m., April 27.
J, Carroll K.G. Hiqqs
Chairman Secretary-Treasurer
I
SCHEDULE "A" C-5
'.
TO: Executive Committee, M.T.R.C.A. , #4/76. "
\
RE: Project W.C.-GO, Erosion Control and Bank Stabilization
in Metropolitan Toronto; 10-Year Programme and 5-Year
Project:
Priorities and Proposed Major Remedial Work Sites for
1976-1978 inclusive
Due to the large number of sites requiring erosion control and
bank stabilization work throughout M~tropolitan Toronto, major
" remedial work is being undertaken on a priority basis. The original
priority ratings listed in the James F. MacLaren report of March,
19'70, are used only as a starting point in assessing the rate of
progress and deterioration during the six years that have elapsed.
Based on year-round monitoring, the severity of the problem in its
present state and a fair idea of its relative potential to deteriorate,
the staff has determined a pool of sites bearing high priority ratings.
The priorities within this pool change continually as we strive to
ameliorate the list with the steady influx of technical data on site
conditions.
The following should help elucidate some of the main constraints
encountered in attempting to work within a rigid priority structure:
(a) Degree of uncertainty in relative rates of progress of
different physical problems (such as bank instability
problems arising from ground water conditions versus
river bank erosion problems) ;
(b) Some problems are more apparent during certain stages of
.
development and are more evident during certain seasons
and/or during seasonal changes;
(c) Where remedial work at a few of the bigger problem areas
could cost in the region of $200,000.-$250,000. a site,
work may have to be confined to one such area per annum
or be undertaken at more than one site in distinct phases
,.spread over two consecutive years, where it is technically
and economically feasible to do so;
(d) Tim~"'lapse involved with the necessity to hire consultants
to determine and analyze geotechnical and engineering
"information prior to deciding on the most appropriate
design alternative for a specific location;
... ' (e) Seasonal preference for certain types of remedial work;
(f) Necessity to plan and maintain an element of practical
continuity in manpower versus machine-oriented forms of
remedial work;
(g) Necessity to continue with or modify remedial work already
carried out by other agencies prior to the inception of
. the Authority1s erosion control and bank stabilization
work programme in September, 1974;
,
.
.
(Contd. . . . . . . . . Page 2) .
C-6
RE: Project W.C.-GO: priorities ilnd Proposed Major
Remedial Wl)rl< sites for 19G7--19711 inclusive 2.
(h) Recognition of the fact. that there is a majority of
higher priority sites on certain watercourses and,
therefore, in certain Boroughs;
. (i) Necessity to retain sufficient flexibility within the
pool of top priority sites in case of inability to
reach agicement regarding such issues as access or
, cost sharing required of all the property owners at
an affected site; or for anyone or a combination of
the constraints identified in items "a" to "g" above.
,"
The following is a list of sites slated for major remedial
work this year. Also included are those sites that are presently
being actively considered under the 1977-1978 major remedial work
programme:
LOCATION WATERSHED WORK YEAR
Yvonne Elementary School Black Creek 1976
30-56 Grovetree Road West Humber River 1976
19-53 Riverview Heights and Humber River 1976
1025 Scarlett Road
24 Stonegate Road llumber River 1976
8-14 Ladywood Drive Humber River 1976
197-205 Sweeney Drive East Don River 1976
190-212 Three Valleys Drive East Don River 1976
Opposite 41-45 Don Valley Driv~ Don River 1976
32 Deannewood Crescent Mimico Creek 1976
Westleigh Crescent vicinity Etobicoke Creek 1976-1977
95-97 Portico Drive Highland Creek 1976
27-31 Ladysbridge Drive Highland Creek 1976-1977
142-186 Humbervale Boulevard Mimico Creek 1977
22 Beaucourt Road Mimico Creek 1977
31-35 Rivercove Drive Mimico Creek 1977
14-28 Delroy.Drive Mimico Creek 1977-1978
Fairglen Crescent vicinity Humber River 1977
91 Forestgrove Drive East.Don River 1977-1978
Restwell Crescent vicinity East Don River 1977-1978
158-168 Three Valleys Drive East Don River 1977
35 Canyon Avenue West Don River 1977-1978
100-104 Gwendol~l Crescetit West Don River 1977,-1978
39-45 Futura Drive Black Creek 1978
22-26 Aviemore Drive Humber River 1978
27-31 Alamosa Drive East Don River 1978
Sunset Ave.-Jellicoe Ave.- Etobicoke Creek 1978
Enfield Ave. vicinity
.
.
. ,
(Contd....... .page 3)
-- ~ ~-~ - --.-
C-7
1m: Project W.C.-60: priorities and Proposed M~jor
Remcdi<1J. ''Jork Sites for 1976-1978 inclusive: 3.
REcor.1MENOl\TION:
THAT the communica tion h~ving reg~rd to Project \~. C. -60,
Erosion Control and Bank Stabilization in Metropolitan Toronto;
lO-Year Programme and 5-Year Project - priorities ~nd Proposed
Major Remedial Work Sites for 1976-1978 inclusive, be received;
and
THAT the proposed major remedial work sites for 1976- \
.
1978 inclusive be confirmed.
,
.
A. Sahabandu,
Project Engineer,
Flood Control and
Water Conservation.
- I
.
AS/RC.
30.3.76.
.
1977 CUR R E N T BUD GET EST I MAT E S
PROGRAH GENERAL i'lATER CONTROL PROJECTS PAGE 2!5 ?
:::: co
c=J
o
c
?G?20S:S: To provide technical data and equipment required for the carrying out of the Authority's PI~i fo= ~
Flood Control and Water Conservation. c=J
t;:l
1977 03JECTIVES: - to continue the Authority's program of flood line mapping :
- to complete the installation of a radio system in co-operation with the Ministry of Natural
Resources for transmitting flood control and flood warning information
- the construction of safety stations at flood control structures
Ft~~DI~;G: This is a shared program: depending on the individual project a 50% or 75% grant is paid by the
Province of Ontario, the balance being funded from the General Levy on all participating
munici.pali ties.
=I~;":''':';CI.n..L CO:/'~1:sNTS:
03J~CTIVE CLASSIFICATION:
.
.
, .
". .
. 19717" CURRENT BUDGET ESTIMATES
PROGRAM GENERAL WATER CONT~OL PROJECTS PAGE
1977 BUDGET SOURCES OF FINANCING 1975 ACTUALS 1976 3:"-:;:;:::-
'ACTIVIIY NET PROVINCIAL MUNICIPAL
EqENDITURES ~UES EXP01-nITURES GRANT LE'VY OTHER EX:PDiD IT'uKZ S RL'WB"UES E.X?~I7G:~S :~'; ,:,,:,~
-
F1 o::.G.l.L....o 'r.-::;.:)ing 5,000. - 5,000. 3,750. 1,250.
- ...- ....~.:.....- - - - - 5~OOO.
, -
;'..<1t."-:0:::-i t::i PaCio System 12,000. - 10,009. 6,000. 6,000. - 10,000.
- - -
:r1coC ~'~ao.."7iin g & Fore- .
ca.sn""lq Systern 4,000. - 4,000. 2,000. 2,000. - 4,000.
. . - - -
Sa:ety Stations at F1cod ~ . ". -.
"..
CD:1~""01 Structures ,
2,000. - 2,000. 1,000. 1,000. - '2,000.
- - -
.
."
. .
- -
-
,
,
, ".
" " ,
" , . .
. . . "
. -
. .
..- . . .
. '.
. .- .
. .
. " .
, .
. -
. 0
I
~
\ 'IO.t.J.L II 23,000. I I If I _-__~J[-- J Jf L" ~
, - 23,000. 12,750. 10,250. - 21.1000.
\ -
,
I 9 7 7 CAP I TAL BUD GET E S TIM ATE S
PROGRP,21 FLOOD CONTROL PLAN
0
I
PUP..?OSE: The purpose of the Flood Control Plan is to provide protection from the hazards of flooding on I-'
0
the streams in the area under the Authority's jurisdiction, to augment sua~er flow as a
pollution abatement measure, and to contribute to the control of streanba~k erosion. This
purpose is being carried out by a program of remedial measures, including flood plai~ a;1c ,,'alley
land acquisition, regulation, channel improvements, the construction of flood '.':ater storage
areas and the management of the works constructed in accordance with a water management plan.
1977 OBJECTIVES: - the Flood Control Plan is currently being carried out under Project WC-63 for ~hich approval
vIas received in 1975
- to continue with the land acquisition component of the remedial measures and the Flood CO:1trol
Plan RevieH
EUNDING: This is a shared program, 50% of the cost of the acquisition of flood plain and conservatio~ land
being eligible for a grant from the Province of Ontario, the balance being funded from the Flood. .
Control Capital Levy on all participating municipalities.
:cn~';'.NCIAL CQ!,mENTS: .
OBJECTIVE C~~SSIFICATION:
- -
--
- ,- ' . I
1977 CAPITAL BUDGET ESTIMATES -
-
FROG RAM FLOOD <XNTP.OL PIAN FAGE
.
~~ ) EY.?2;JJ lTURES
1977 BUDGET SOURCES OF FINANCING 1976 ACTIJALS 1976 B1.:~G~
AcrIVIT'l NET PROVINCIAL MUNICIPAL
REVTh1JES EXPENDITURES GRANT LEVY ornER EXPaill ITURES REVE~;t;r:S 70.-;l:E:X;) I ":"'T ~ ':' 5 I -:; :--:"" - -:" ~
_"'-J...... J.....,_____ ..._7_':---
I I
I
La.~ JI~..risi tiO:1 2,523,296. - 2,523,296. 1,261,648. 1,261,648. ! 1,262,000.
Plal'1 ?z'_"1.CW Studies 250,000. - 250,000. 125,000. 125,000. -
G. ;ass Lon Da:'n site 50,000. 50,000. 25,000. 25,000. _2.00,000;
. .
. , .. -r
-- "
~
.' -, . i ' '
,
" . -- ' ' '
. .~ .
-. . . - I " :
, "'
. .' -.: '4.. ... : . , . :
- . -. . .' ; , .
- ,- ---
. . _. _..:~r ( . ., . -, "
. . !
- . .. -' ,
. " - . . . -
\
.- ,-' . ". ..
" .- -
.";.- . , ' . ~
I .. " .. : .. , . -
. . ' . -, " -
'- . ' ~ . . -' -
"~
. " . . - . ' .
- ' , i ~ " " -
<0.0" ,.- , ' ,
: ..
. ' "
-. .' . . " -,
'-
. ' .
'.
. ' !
. l ()
. I
: . !-'
!-'
-
'Wi'J.L 112,82),296. \ 12'S2)'296:_Jf ~~~1'648.ll'411,d )[ I ][ 1,3S2,OQJ. I - :
-
,
1 9 7 7 CAP I TAL BUD GET EST I MAT E S
n
PROGRA...'1 ~vATER CONTROL PROJECTS ( BENEFITING MUNICIPALITIES) I
t-'
N
PURPOSE: The purpose of this Program is to carry out required water control works on the strefuuS in the
area under the jurisdiction of the Authority in which individual member municipalities benefit.
Such projects specify which municipalities are designated as benefiting.
1977 OBJECTIVES: The objectives of this Program for 1977 include the carrying out of erosion co~trol works at
specific locations ln the lower valleys in accordance with requests made of the Authority by
individual municipalities and the Authority's priority of works established in Project KC-60,
Downstream Erosion Control.
?l.J~!)1SG : A 50% grant from the Province of Ontario is available for all expenditures except engineering
studies, on which a 75% grant is available, the balance being funded from the Capital Levies
on participating municipalities designated as benefiting.
FI~ANCIAL COVu'1ENTS:
03JECTIv~ CLASSIFICATION:
f
. '
" .
. 19717, CURRENT BUDGET ESTIMATES
PROGRAM l'w:n:..K CDNTT-DL PFOJEcrs (BENEFITING !-'iIJNICIPALITIES) P~G~
1977 BUDGET SOURCES OF FINfu~CING 1976 ACTUALS 197 6 E:'-:C:::-
'ACTIVITY NET PROVINCIAL ~~ICIPAL I
EXPDillITU?-ES PEVElWES EXPDilHTURES GRANT LeVY OTHER DG'Th"DITIi"RES Fr'r2\i.j~S t ::...'C?2wITi.'7'\ZS :?~~..-
, - I .-.
I
",Y"'-'" r-, - ~." \
, .......:;> I - u.~l. .L:-pr. ,.':.Jl!UCO
C::'es::,~'altc:1 ' 10,000.
~';C53 - C:"'zn.L",?r.,Don
':/~...:'::)_ -=-~..........,.... 4- ~ -,. h
...~,.__,=_,u;.S,- ......... ;:L'l1C! 60,000.
:'7:S0 - Co',.:lSrre2.'11 ... ' I
_ ~Si0:'l, Cc:1L--V~. ' 500,000. 500,000. 250,000. 250,000. 500, COO. ,
~:~~~eer~lg St~Oles 100,000. 100,000. 75,000. 25,000. 30,OOO~
C:.2...'"1.I::;:=-. ,~;il::et Cree.'< 500,000. 500,000. 250,000. 250,000. ' ,
C-Z-"i. L",,:,?r., , Elae:..::: Creek '
:~_O:=.~r::le ~l~,~h~ 150,000. 150,000. 75,000. 75,000. " I ...~
C.c-,. -'-., '="_ " uc:n~C1a ' .
G:';~f Cl'..~ 100,000. 100,000., 50,000. 50,000.
C:"'...:-.== ::::::OSiCl:1 Cont...""Ol I
p:-;:;ject.s 450,000. 450,000. 225,000. 225,000. " "
,- ..
0'
J
I-'
w
l ..
- --*
\ ror."L II l,aoo,Ooo. l 11,aoo,000. If 925,000.1 a75,000. I 1r ]r- 602.,':0. I -
_._____.__ "'u l _______ '...---~-
\
1 9 7 7 CUR R E N T BUD GET EST I MAT E S
()
PROGR&~: MAINTENANCE OF WATER CONTROL STRUCTURES I
I-'
*'"
PL'?20S:'::: : To ffiaintain Flood Control works established under the Authority1s Plan for Flood Control
and Water Conservation.
1977 03JECTIVES: A continuation of the maintenance of Flood Control works at a general level comparable
with that"of 1976
:?'L.~~:)~~;G : A Provincial Grant of 75% is available, the balance being funded fro~ the Gene~al Levy on
---- all participazing municipalities.
?::::?~;-':';CI.AL COYJ.J.LNTS:
C3J~CTIV~ CLASSIF:CATION:
.
.
,
- 19717 ' CURRENT BUDGET ESTIMATES
PROGRAM MAINTENANCE OF WATER CONTROL STRUCTURES PAG~
1977 BUDGET SOURCES OF FIN~~CING 19706 ACTUALS 197 E 3L-:Jc;~
AC'ITVITY NET PROVINCIAL MUNICIPAL
EX;PENDITURES REV'DllJES EXPENDITURES GRANT LEVY OTHER EXPE~"D IT'tJRE S REVDt-0ES -'--;:>-=-'-~--L-- \ -----,,--
~ .. " I J.. ,..... ~ .... -....., -....
-. -.- .~ - ---
-- I
I
Q?2-:-atic;1 of Flocd
~':2..."'T'.i:ig Systen 8,000. 8,000. 6,000. 2,000. 5,100.
CJ.a::revil1e D.:J.I!1 21, 000. 21,000. 15,750. 5,250. 19,000.
:,:i.L-:2 D2..-:l 4,000. 4,000. 3,000. 1,000. 3~OOO.
G. ?oss wrd Da:n 20,000. 20,000. 15,000. 5,000. lS,COO.
.
2;:'cl1 Dc::-s General 5,000. 5,000. 3,750. 1,250. 4,400.
?.i '\''2:::- c:r ,ar1!1e1 5 64,000. 64,000. 48,000. 16,000. 50,500.
-
on
I
I-'
U1
r II \ I ][ I I ][ I ][ I
I 'IOi:AL 122,000. 122,000. 91,500. 30,500.
\ 100,000.
.
- - --- ~----
---------
C-l6
SCHEDULE "c"
DRAF'I' PROPOSAL
FLOOD CONTROL PLAN REVIEW
I. PURPOSE OF REVIEW:
II. HISTORICAL REVIEW:
(a) Conservation Authorities conception to 1954:
(i) First Conservation Authorities Act
(ii) Flood control responsibilities
(iii) Department of Planning and Development
(iv) History and formation of M.T.R.C.A.
(b) Hurricane Hazel - October, 1954:
(i) Description of physical damages and loss
of lives
(ii) Hydrological description
(iii) Relief programs - Flood Homes Assistance Act, etc.
(i v) New flood control responsibilities of M.T.R.C.A.
(c) Hurricane Hazel to adoption of Flood Control Plan - 1959:
(i) Decision by M.T.R.C.A. and Province to provide
flood control, using Hurricane Hazel as design
storm
(ii) Methods available to achieve flood protection
. . acquisition
. . upstream storage dams
. . channelization
. . regulations
. . planning
. . Flood Warning System
. . flood proofing
(iii) Preliminary engineering studies undertaken prior
to formulating plan, outlining
. . site selection
. . alternative studies
. . environmental considerations
. . social considerations
. . economic considerations
(iv) Benefits of Flood Control Program proposed in
studies . . flood control
. . low flow augmentation
. . pollution control
. . recreation
(v) Review of "Plan for Flood Control and Water
Conservation"
(d) Adoption of Flood Control Plan:
(i) Adoption of Plan by provincial and Federal Govern-
ments and MTRCA . . "Plan for Flood Control & Water
Conservation" - June 14, 1961
(Federal-Provincial-Authority
agreement executed)
. . "Project W.C.-63 - Extension to
the Plan for Flood Control and
Water Conservation", approved by
the Province October 19, 1971
. . "Project W.C.-63 Extension - A
Further Extension to the Flood
Control Plan" - approved by the
Province December 3, 1975.
(Contd.......Page 2) .
DIU\FT PROPOS^L C-l7
FLOOD CONTROL PL^N REVIEW: 2.
(ii) Endorsement of Plan
. . Board of Trade
. . Official Plans, etc.
. . Metro Parks 25-Year Plan
. . Conservation Area programs
III. IMPLEMENTATION OF FLOOD CONTROL PL^N:
(a) policies adopted to implement Plan after adoption:
(i) Statement of Policy - Flood Plain and Conservation
Lands
, (ii) Policy for reservoir planning
(iii) Program for the Establishment and Maintenance of
Hydrometric and Recording Rain Gauges
(i v) Plan of Ancillary Conservation Measures
(v) Fill Regulations
(b) Achievements to Date:
(i) Dams constructed
(ii) Channels constructed
(iii) Flood Warning system
(iv) Acquisition
(v) Regulations
(c) Analysis of Achievements:
(i) Effect of dams constructed
(ii) .. II channels cqnstructed
(iii) II II acquisition and regulations
(iv) Achievements of plan of Ancillary Conservation
Measures
(d) Existing Monitoring Programs:
(i) Experience gained in operation
(ii) James F. MacLaren1s Claireville monitoring
(iii) Stream and rain gauges
(iv) Ministry of Natural Resources and Land Management
Division fish inventory
(v) MTRCA and Ministry of the Environment Co-operative
Water Sampling
(vi) Swimming area water quality monitoring
(vii) Water Survey of Canada - sediment surveys of
reservoirs in Ontario
(viii) Student studies
(ix) Lake St. George studies
IV. DEMANDS ON RIVER VALLEY SYSTEM:
(a) Existing and Future Demands
(i) Development
(ii) Recreation
(iii) Open Space
(iv) utilities
(v) Transportation routes
(vi) Storm water discharge
(Con td . . . . . . . . . Page 3).
.
C-18
DRAF'l' PROPOSAL
FLOOD CON'l'EOL PLAN REVIEW: 3.
IV. DEMANDS ON RIVER VALLEY SYSTEM (Con t ' d . ) :
(b) Effect of demands on valley system:
(i) Flora and fauna
(ii) Water quality
(iii) Erosion
(i v) Increased peak flows
(v) Increased investment in valley
V. FLOOD CONTROL PLAN REVIEh':
(a) Implementation of monitoring program at existing sites
(b) Define and identify IIflood vulnerable areas":
(i) Assess degree of flooding
(ii) II level of protection required
(c) Methods available to provide protection needed:
(i) EXisting commitment, if any
(ii) Alternatives available
(iii) Environmental, social and financial impact
of alternatives
(d) Evaluation and ranking of alternatives:
. . Acquisition
. . Upstream storage dams
. . Channelization
. . Regulations
. . Planning
. . Flood Warning system
. . Flood proofing
(e) Development and implementation of monitoring program
incorporating existing monitoring program (see (a) above)
extended to include proposed development evaluated in
(d) above.
23.4.76.
CM/KC.
~ C-l9
,
the metropolitan toronto and region conservation authority
minutes
-~
FLOOD CONTROL & WATER CONS. ADV. BOARD THURSDAY-SEPT-23-l976 #2/76
The Flood Control and Water Conservation Advisory Board met at the
Authority Office, 5 Shoreham Drive, Downsview, on Thursday, September
23, 1976, commencing at 2:00 p.m.
PRESENT WERE
Chairman J. Carroll
Vice Chairman WIn. R. Herridge, Q.C.
Members C.F. Kline
H.C. Lawrie
F.J. McKechnie
J.G. Mottershead
H. Westney
Chairman of the Authority R.G. Henderson
Vice Chairman of the Authority Mrs, F. Gel1
Secretary-Treasurer K.G. Higgs
Special Adviser F.L. Lunn
Adm. - Water Resource Division M.R. Garrett
Head, Flood Control Section J.C. Mather
Project Engineer, Dev. A.G. Sahabandu
Project Biologist I. Macnab
Project Planner T.E. Farrell
Project Engineer R. Saadia
Ministry of Natural Resources R.E. Lewi s , Project Engineer
ABSENT WERE
Members R. Cunningham
Dr. M.L. Dobkin
E.V. Kolb
Dr. G. Ross Lord
J. Sewell
Mr. Carroll opened the Meeting then turned the Chair over to Vice
Chairman Herridge and left the Meeting to keep a medical appointment.
MINUTES
The Minutes of Meeting ~1/76 were presented.
Res. #11 Moved by: C.F. Kline
Seconded by: H. Westney
t
-
RESOLVED THAT: The Minutes of Meeting #l/76, as presented, be adopted.
CARRIED;
STAFF PROGRESS REPORT
The staff presented a comprehensive Progress Report, highlighting the
following general items: General water control, Flood Warning System,
Flood Control Plan Review, Project W.C.60, Enforcement of Authority
Regulations and the Acquisition of Flood Plain Land; in addition, a
number of slides of the Highland Creek flood during the storms of
August 27 and 28, 1976 and advised that a complete and comprehensive
report on the said flood was being prepared.
- -----
C-20 -2-
Res. 1t12 Moved by: R.G. Henderson
Seconded by: C.F. Kline
RESOLVED THAT: The staff progress report, as presented, be received
with appreciation.
CARRIED;
ORGANIZATION OF
WATER RESOURCE DIVISION
Mr. Higgs presented the proposed organization of the Water Resource
Division.
Res. ~13 Moved by: J.G. Mottershead
Seconded by: C. F. Kline
RESOLVED THAT: The presentation of the proposed organization of the
Water Resource Division be received for information; and
THE BOARD RECOMMENDS THAT: The proposed organization of the Water
Resource Division be submitted to the Personnel Sub-Committee for
their consideration and approval. CARRIED;
FLOOD CONTROL TASK FORCE
A staff communication was presented advi~ing of the action taken by
the Executive Committee regarding the establishment of a Flood Control
Task Force similar to the Waterfront Task Force, which would include
representatives of various agencies and departments. The Board was
further advised that the Task Force would be a technical advisory
body to the Flood Control and Water Conservation Advisory Board.
Res. ~l4 Moved by: F.J. McKechnie
Seconded by: H.C. Lawrie
RESOLVED THAT: The report on the establishment of a Flood Control
Task Force be received and that the staff be requested to provide
members of the Board with a list indicating the agencies and personnel
that would make up the said Task Force.
CARRIED;
PROJECT W.C.60 - DOWNSTREAM
EROSION CONTROL - POLICY
A staff communication was presented advising that the Borough of
Etobicoke, by letter, had requested the Authority review the type and
size of Authority projects being included in Project W.C.60, with a
view to carrying out more minor erosion control works.
Res. ~15 Moved by: F.J. McKechnie
Seconded by: H. Westney
RESOLVED THAT: The staff communication having regard to Project W.C.60
- Downstream Erosion Control - Policy, be received; and
THE BOARD RECOMMENDS THAT: The Borough of Etobicoke be advised that
The Metropolitan Toronto and Region Conservation Authority carries out
erosion control works in Metropolitan Toronto based on an approved
priority schedule; and further
THAT the Authority believes that without increased funding, this
is the only reasonable way of handling erosion control works in
Metropolitan Toronto.
CARRIED;
-3- C-2l
FLOOD WARNING SYSTEM
A staff communication having regard to the Flood Warning System was
presented and discussed in detail.
Res. 1/:16 Moved by: J.G. Mottershead
Seconded by: C.F. Kline
RESOLVED THAT: The staff report on the Flood Warning System be re-
ceived and appended as Schedule "A" of these Minutes; and
THE BOARD RECOMMENDS THAT: The Recommendation contained in the staff
report having regard to the Flood Warning System, as appended as
Schedule "A" of these Minutes, be adopted; and further
THAT the staff proceed with steps required to have the system operate
at maximum efficiency; and
THAT copies of the Ministry publication "Planning for Fiood Emergencies"
be provided to all members.
CARRIED;
WATERSHED ENVIRONMENTAL
MONITORING PROGRAMME
A staff report on the Watershed Environmental Monitoring Programme
was presented and discussed in some deta~l.
Res. ~17 Moved by: C.F. Kline
Seconded by: F.J. McKechnie
RESOLVED THAT: The staff report on Watershed Environmental Monitoring
Programme be received for information.
CARRIED;
1977 FLOOD CONTROL PROGRAMME AND
PRELIMINARY BUDGET ESTIMATES (AMENDED)
A staff communication, together with 1977 Preliminary Budget Estimates,
as amended, were presented and considered.
Res. #18 Moved by: C.F. Kline
Seconded by: H.C. Lawrie
RESOLVED THAT: The 1977 Flood Control Programme and Preliminary
Budget Estimates, as amended, be received and appended as Schedule
"B" of these Minutes; and
THE BOARD RECOMMENDS THAT: The 1977 Preliminary Budget Estimates, as
amended, Current and Capital, be approved and included in the 1977
Preliminary Budget Estimates of the Authority.
CARRIED;
NEW BUSINESS
EROSION CONTROL AND
BANK STABILIZATION PROJECTS
~10tion Moved by: J.G. Mottershead
Seconded by: F.J. McKechnie
RESOLVED THAT: The proposed Erosion Control and Bank Stabilization
Projects, other than emergency measures, in excess of $75,000.00, be
submitted to the Flood Control and Water Conservation Advisory Board
prior to submission to the Executive Committee.
The Motion was - - - - - - - - - - - - - - - - - - - - - NOT CARRIED;
---~- ~-~ - --
C-22 -4- .
PROPOSED PRELIMINARY STUDY
- MIMICO CREEK
Res. #=19 Moved by: F.J. McKechnie
Seconded by: J.G. Mottershead
THE BOARD RECOMMENDS THAT: A Preliminary Study be carried out on the
Mimico Creek immediately, to enable development in Brampton to proceed
as quickly as possible, with proper consideration and funding for
possible downstream flooding; and further
THAT any funds required be taken from the Hydrologic Model funds
budget.
On a recorded vote, present and voting:
Affirmative Neqative
F.J. McKechnie C.F. Kline
J.G. Mottershead H.C. Lawrie
Wm. R. Herridge, Q.C. H. Westney
The Acting Chairman cast a second and deciding vote and the Recommend-
ation was - - - - - - - - - - - - - - - - - - - - - - - - - - CARRIED;
EMERGENCY ACTION
Res. #20 Moved by: J.G. Mottershead
Seconded by: F.J. McKechnie
THE BOARD RECOMMENDS THAT: In the event of a flood emergency the staff
be authorized and directed to take such action as may be necessary
within the resources available.
CARRIED;
POSSIBLE DIVERSION
EAST BRANCH MIMICO CREEK
TO WEST BRANCH OF HUMBER
Res. #2l Moved by: F.J. McKechnie
Seconded by: J.G. Mottershead
THE BOARD RECOMMENDS THAT: A report be prepared on the need for and
desirability of diverting the East Branch of the Mimico Creek along
Highway 407 alignment to empty into the West Branch of the Humber
River.
CARRIED;
PROJECT W.C.57 - CHANNEL IMPROVEMENTS
MIMICO CREEK, MALTON VILLAGE
Res. #22 Moved by: F.J. McKechnie
Seconded by: C.F. Kline
TIlE BOARD RECOMMENDS THAT: The Executive direct the staff to have
Project W.C.57 - Channel Improvements - Mimico Creek, Malton Village,
completed in a manner consistent with the aims of the Authority, with
proper landscaping and tree planting.
CARRIED;
-5- C-23
.
ADJOURNMENT
On Motion, the Meeting adjourned at 6:l0 p.m., September 23.
Wm. R. Herridqe, Vice Chairman K.G. Hiqqs
Acting Chairman Secretary-Treasurer
C-24
SCHEDULE "All
TO: TIlE CHAIRMAN AND MEMBERS OF THE FLOOD CONTROL AND WATER
CONSERVATION ADVISORY BOARD
RE: FLOOD WARNING SYSTEM
The Flood Warning System is a major component of the Authority1s
Flood Control Program and it is one aspect which will be studied
as part of the Flood Control Plan Review. The establishment of a
radio communication system for the Authority, was the first step
in updating and re-vitalizing the Flood Warning System. Several
other steps are planned whiCh will strengthen the system and
ensure that the Authority's role and responsibilities for Flood
Warninq are met.
The decision bv the Province of Ontario to disband the Emergency
Measures Organization and designate the Ministry of Natural
Resources as the head Ministry for flood control and forest fire
control resulted in the Ministry of Natural Resources preparing a
list of responsibilities of the Ministry, the Municipalities and
the Conservation Authorities in the event of a flood emergency.
These responsibilities were published in a booklet and distributed
in the spring of 1976. The various responsibilities are outlined
below:
1) Municipalities
l. The responsibilities of police, fire, public utilities,
welfare, health and other municipal service requi~-ed
in an emergency and the method by which each service
will function should be included in the Flood
Contingency Plan.
2. The municipality should appoint a Flood Co-ordinator who
will:
(a) Assess a flood situation.
(b) Recommend municipal declaration of an emergency.
(c) Upon declaration of a municipal emergency implement
the Flood Contingency Plan and co-ordinate the
municipal response.
(d) Liaise with the Conservation Authority where applica-
ble and with the local Ministry of Natural Resources
Response Co-ordinator.
(e) Determine if municipal resources are adequate or if
additional resources are needed.
( f) Recommend the municipality request Provincial assis-
tance.
. . . /2
C-25
TO: THE CHAIRMAN AND MEMBERS OF THE FLOOD CONTROL AND WATER
CONSERVATION ADVISORY BOARD
RE: FLOOD WARNING SYSTEM Page 2
2) Conservation Authorities
It will be a function of Conservation Authorities to:
1. Maintain a flood warning system throughout the Authority
for alerting municipal representatives, media, local
police, the Ontario Provincial Police, the Ministry of
Natural Resources, etc.
2. Stimulate co-ordinated contingency planning by and among
municipalities lying within the Authority. ,
3. Maintain awareness of the status of the provincial
response to flood emergency through consultation with the
local Ministry of Natural Resources Response Co-ordinator.
4 . Provide technical advice to municipalities in preventing
or reducing the effect of flooding.
5. Liaise with the local Response Co-ordinator in matters
related to declaring a provincial emergency, and securing
provincial resources in the event of a declared provincial
emergency.
6. Advise the local Response Co-ordinator when municipal
resources have been fully committed, the need for addi-
tional resources, and the need for declaration of a pro-
vincial emergency.
7. Following consultation with municipalities, advise the
local Response Co-ordinator when an emergency no longer
exists.
8. Designate personnel who will carry out the functions men-
tioned in sections 2.1 to 2.7 and any other functions as
appear appropriate.
3) The Ministry of Natural Resources
1. The Ministry will appoint a Provincial Co-ordinator who
will:
(a) Establish a provincial emergency response plan.
(b) Liaise with other ministries and secure authorization
and support for action at field level, as necessary
to organize and deliver a provincial response.
. . . /3
C-26
TO: THE CHAIRMAN AND MEMBERS OF THE FLOOD CONTROL AND WATER
CONSERVATION ADVISORY BOARD
RE: FLOOD WARNING SYSTEM Page 3
3) 1. (c) Anticipate and receive recommendations for provincial
declaration of an emergency.
( d) Brief the Minister of Natural Resources and recommend
provincial declaration of emergency.
2. Within Conservation Authorities the Ministry will:
(a) Maintain a provincial flood warning system to alert
Conservation Authorities.
(b) Organize the provincial response in support of efforts
by a municipality to combat an emergency.
(c) Appoint a local Response Co-ordinator who will:
(i) Liaise with the Conservation Authority.
(ii) Alert Ministry key personnel and other
ministries.
(iii) Assess the situation with the Conservation
Authority.
(iv) Recommend to the Provincial Co-ordinator
declaration of a provincial emergency where
warranted.
(d) Respond to a request by a municipality for provincial
assistance with respect to a flood emergency, provided
that:
(i) The total resources of and available to the
municipality under its Flood Contingency Plan
have been committed or are inadequate to deal
with the emergency.
(ii) The municipality has declared that an emergency
exists within the municipality, and the
declaration has been made by a municipal
official designated in a pre-established Flood
Contingency Plan for that purpose.
(iii) The request for provincial assistance is origi-
nated by a responsible municipal official.
(i v) The Minister of Natural Resources makes a
declaration that a provincial emergency exists.
(e) Co-ordinate delivery of the provincial response in a
declared provincial emergency.
. ../4
C-27
TO: THE CHAIRMAN AND MEMBERS OF THE FLOOD CONTROL AND WATER
CONSERVATION ADVISORY BOARD
.
RE: FLOOD WARNING SYSTEM Page 4
As a result of the responsibilities listed above, the Authority.s
first step was to arrange a meeting with the local Response
Co-ordinator. At this meeting the Authority felt that it should
take an active role in ensuring that the local municipalities have
developed a flood contingency plan and to provide assistance to
those municipalities which have not as yet developed a plan. In
this regard, we suggested that the Ministry of Natural Resources
prepare a general plan which would be adopted by each municipality
to meet its own particular needs. Once this plan is available the
Authority' will meet with our Regional Municipalities to present
the plan. It is hoped that this initial step will stimulate
co-ordinated contingency planning by the municipalities within the
Authority.
The other major function as indicated above is the operation of a
flood warning system for alerting the municipalities, media, police,
and the Ministry of Natural Resources of an impending flood
emergency so that they can implement their contingency plans as soon
as possible. As indicated the radio system for the Authority is a
major component in the flood warning system and will provide a
communication network which was not possible before. Having the
facility along with the use of the Ministry of Natural Resources
emergency frequency, will ensure that the Ministry of Natu~al
Resources and the local Response Co-ordinator can be kept fully
informed of the status of the flood emergency so that they can react
when called upon.
Minor changes in the rain gauge reporting system have been made
already which will facilitate and improve the relaying of rainfall
information from the readers to the appropriate Authority Staff.
Better liaison with the readers is also proposed by maintaining
closer contact by sending them a copy of the Authority.s newsletter
and more personal contact with Authority staff through site visits
and telephone.
Once the Flood Warning System has been developed it is important
that each component operates efficiently. In this regard, the
Authority proposes to operate periodically, a simulated flood alert
so that the operation can be studied and any weaknesses noted and
rectified before actually being put to a test.
. .. /5
-------------------
C-28
TO: TIlE CHAIRMAN l\ND MEMBERS Of' THE FLOOD CONTROL AND Wl\TER
CONSERVATION ADVISORY BOARD
RE: FLOOD WARNING SYSTEM
Page 5
Any system as complicated as the Flood Warning System with as
many different agencies and integral parts can not operate well
without practice. We are therefore planning to run flood alert
exercises throughout each year. It is hoped to run the first one
this fall and would entail only the Authority staff at this stage.
Once this level is operating effectivel~ the municipalities, police
forces, etc. would be asked to participate to test their contingency
plans and to test the co-ordination required among all the various
agencies.
.
Other recommendations will result from both the flood alert
exercises and in the overall Flood Control Plan Review and the
necessary changes will be made. However, it is hoped that the steps
outlined above will provide a more sound base for the flood warning
system and ensure that it is operating well and effectively.
RECOMMENDATION
FLOOD WARNING SYSTEM
IT IS RECOMMENDED THAT: The operation of the Authority.s Flood
Warning System be given top priority; and further I Lhe staff proceed
with any steps required to have the system operate at maximum
efficiency.
M. R. Garrett
Administrator
Water Resource Division
September 14, 1976
JCM/fn
.
,
, S C H E D U L E
,r.n
o F i)
::r:
. c=J
PRO J E C TED LEVI.'ES & TOT A L FUN DIN G FOR 197 7 8
t"i
.:zj
:
co
:
.
.
Flood
Municipality General Control Waterfront
.
.' $ S $
Adjala Township 171. 212. 82.
I
. Durham, Regional Municipality of 56,104. 31,800. 151,403.
.
Me~ropolitan Toronto 1,650,704. .,2,050,000. 1,950,000.
. Mono Township., . 165. 205. 75.
Peel, Regional Municipality of 167,856. 138,986. 46,457.
.
York, Regional Municipality of 130,012. 127,593. 51,983.
.
2,005,012, 2,348,796. 2,200,000.
.
;:: r
:wr ; J
'-'
. I'
. ......: \.J
28/05/76 (;',
.
PRELl MINARY
1977 CURRENT BUDGET ESTIMATES
PROGRAM MAINTENANCE OF WATER CONTROL STRUCTURES PAGE
0
I
w
0
.
PURPOSE: To maintain Flood Control works established under the Authority's Plan for Flood Control
and Water Conservation.
1977 OBJECTIVES: A continuation of the maintenance of Flood Control works at a general level comparable
with that of 1976.
FUNDING: A Provincial Grant of 75% is available, the balance being funded from the General Levy on
all participating municipalities.
FINANCIAL CO~~NTS:
.
OBJECTIVE CLASSIFICATION:
.
I I \l.-l.-IIVIII ",--" , ,
1977 CURRENT BUDGET ESTIMATES
PROGRAM . MAINTENANCE OF WATER CONTROL STRUCTURES PAGE
3 1977 BUDGET SOURCES OF FIN&~CING 1976 ESTH1ATES 1975 ACTC..;L
Net Provincial Municipal
Activit Expenditures Revenues Expenditures Grunt Levy Other Expenditures Revenues Expenditures Rever:ues
-----
---..-. - -
Operation of Flood '
YJar::..ing System 10,000. - 10,000. 7,500. 2,500. - 5,100. - 3,778. -
C1airevil1e Dam 21~000. - 21,000. 15,750. 5,250. - 19,000. - 19,004. -
Milne Dam 4,000. - 4,000. 3,000. 1,000. - 3,000. - 7,836. -
G. Ross Lord Dam 20,000. - 20,000. 15,000. 5,000. - 18,000. - 16,69l. -
Small Dams General 5,000. - 5,000. 3,750. 1,250. - 4,400. - 1,98l. -
River Channels 62,000. - 62,000. 46,500. 15,500. - 50,500. - 83,922. -
Major Maintenance 18,000. - 18,000. 13,500. 4,500. - - - - -
I
n
I
I (.'-
, :
----- -
TOTAL ][ 140,000. I - I 140,000. )[ 105,000. I 35,000. I - ][ 100,000. I - ][ 133,212. I - J
" ".
PRELl MINARY
1977 CURRENT BUDGET ESTIMATES .
0
I
GENERAL WATER CONTROL PROJECTS PAGE w
PROGRAM N
PURPOSE: To provide technical data and equipment required for the carrying out of the Authority's Plan for
Flood Control and Water Conservation.
1977 OBJECTIVES:
- To continue the program of the installation of a radio system in co-operation with the
Ministry of Natural Resources for transmitting flood control and flood warning information
- The construction of safety stations at flood control structures
- ,The installation of two more Telemark stream gauges in the continuing program of stream gauge
telemetry.
- The provision of funds to carry out certain works on flood control structures which are not
eligible for a normal maintenance grant.
FUNDING: This is a shared program, 50% of the cost of the proposed works being eligible for a grant from the
Province of Ontario, the balance being funded from the General Levy on all participating municipalities
.
FINANCIAL CO~~NTS:
OBJECTIVE, CLASSIFICATION:
.
rl\c.LIIVIII \JM! \ I
1977 CURRENT BUDGET ESTIMATES
PROGRAM . GENERAL WATER CONTROL PROJECTS PAGE
AOtiViO~ 1977 BUDGET SOURCES OF FI~~~CING 1976 ESTIHATES 1975 ACTIJAL
Net Provincial Hunicipal
-' . Expenditures Revenues Expenditures Grant Levy Other Expenditures Revenues Expenditt:res Rei.'e:lUeS
FLOOD WAm~ING SYSTEM
Radio 20,000. - 20,000. 10,000. 10,000. - 10,000. - - -
Te1emarks 6,000. - 6,000. 3,000. 3,000. - 4,000. - 3,369. -
Flood Control Centre 2,000. - 2,000. 1,000. 1,000. - - - - -
Floodline Mapping - - - - - - 5,000. - - -
SAFETY STATIO~S 2,000. - 2,000. 1,000. 1,000. - 2,000. - - -
.
'FLOOD CONTROL
STRUCTURES 10,000. - 10,000. 5,000. 5,000. - - - - - I
I
,
(
I
C
(
! -
J[ I I ][ I 20,000. I ][ I ]( I ]
TOTAL 40,000. - 40,000. 20,000. - 21,000. - 3,369. I -
PRELl MINARY
1977 CAPITAL BUDGET ESTIMATES
o
I
PROGRAM FLOOD CONTROL PLAN ~
, PAGE
PURPOSE: The purpose of the Flood Control Plan is to provide protection from the hazards of flooding on the
streams in the area under the Authority1s jurisdiction, to augment summer flow as a pollution abatement
measure, and to contribute to the control of streambank erosion. This purpose is being carried out by
a program of remedial measures, including flood plain and valley land acquisition, regulation, channel
improvements, the construction of flood water storage areas and the management of the works constructed
in accordance with a water management plan.
1977 OBJECTIVES: - The Flood Control Plan is currently being carried out under Project WC-G3 for which approval was
received in 1975
- To continue with the land acquisition component of the remedial measures
- To carry out a review of the Flood Control Plan from not only a hydrologicJhydraulic point of view,
but from an environmental aspect as well.
- To study and inventory erosion sites within the whole area under the jurisdiction of the Authority
for use in the plan review process as well as providing the basis for an all encompassing erosion
control program.
FUNDING: This is a shared program, 50% of the cost of the acquisition of flood plain and conservation land
being eligible for a grant from the Province of Ontario, the balance being funded from the Flood
Control Capital Levy on all participating municipalities.
FINANCIAL, CO!-lMENTS:
OBJECTIVE CLASSIFICATION:
II \LLIIVIII \It-\I \ I
1977 CAPIT AL BUDGET ESTIMATES
PROGRAM FLOOD CONTROL PLAN PAGE
~ 1
1977 BUDGET SOURCES OF FI~k~CING 1976 ESTI!-1ATES 1975 P-.C:'LU..S
Provincial Municipal Revenues I
Activity Expenditures Revenues Expenditures Grant Levy Other Expenditures Revenues Expendit\;res
-- - - --
MAPPING 800,000. - 800,000. 400,000. 400,000. - - - - -
G. ROSS LORD DAM 50,000. - 50,000. 25,000. 25,000. - 330,000. - - -
FLOOD CO~ROL PLAN
REVIEW SnJDIES
Hydrologic Model 150,000. - 150,000. 75,000. 75,000. - - - - -
Environoenta1 Monitorin 150,000. - 150,000. 75,000. 75,000. - - - - -
Erosion Inventory 150,000. - 150,000. 75,000. 75,000. - - - - -
FLOOD CO~~OL PLAN
REVIEH 50,000. - 50,000. 25,000. 25,000. - - - - -
Flood Plain Land
Acquisition 2,088,000. - 2,088,000. 844,000. 844,000. 400,000. 1,483,850. - 392,777. -
()
I
w
U1
-] I I ] [ 1,813,850. I }[ I j
I
TOTAL 3,438,000. - 3,438,000. 1,519,000. 1,519,000. L.OO,OOO. - 392,777. I -
I
PRELl MINARY
1977 CAPITAL BUDGET ESTIMATES
0
I
PROGRAM WATER CONTROL PROJECTS (BENEFITI~G MUNICIPALITIES) Wi
PAGE 0'1
PURPOSE: The purpose of this Program is to carry out required water control works on the streams in the
area under the jurisdiction of the Authority in which individual member municipalities benefit.
Such projects specify which municipalities are designated as benefiting.
I
1977 OBJECTIVES: The objectives of this Program for 1977 include the carrying out of erosion control and flood control
works at specific locations in the river valleys in accordance with requests made of the Authority by
individual municipalities. The reconstruction of Authority works destroyed on the Highland Creek due
to severe flooding in August of 1976 is also included in this program.
FUNDING: A 50% grant from the Province of Ontario is available for all expenditures except engineering studies
on which a 75% grant is available, the balance being funded from the Capital Levies on participating
municipalities designated as benefiting.
FINANCIAL COHHENTS:
.
OBJECTIVE CLASSIFICATION:
r r\C LIIVIII 'JHI \ I
1977 CAPITAL BUDGET ESTIMATES
PROGRAM WATER CONTROL PROJECTS (BENEFITING MUNICTPALTTTF.S) PAGE
.
1 Expenditures 1977 BUDGET SOURCES OF FI~TA1'JCING 1976 ESTIMATES 1975 ACITALS
Provincial Municipal
Activity Revenues Expenditures Grant Levy Other Expenditures Revenues Expencitt:res Reve:1t:es
\;C-53 C.I. }~ssey Cree - - - - - - - - 9,007.
-
\.;C- 57 Mirnico Creek,
Mal ton - - - - - - 10,000. - 34,307.
-
WC-58 Don River, .
Bathurst to Finc 60,000. - 60,000. 30~000. 30,000. - 60,000. - 639. -
WC-60 DOv.'I1stream Ero-
sion Control 500,000. - 500,000. 250,000. 250,000. - 500,000. - 291,421. -
WC-69 Richmond Hill
Hill Pond - - - - - - - - 104,265.
-
WC-61 Stouffvil1e
Channel 600,000. - 600,000. 300,000. 300,000. - - - - -
l-,'C-71 Hod. of Energy -
Dissipator,
Brarnpton Diver-
sion Channel - - - - - - - - 11,249.
-
Reconstruction of
Highland Creek 440,000. - 440,000. 220,000. 220,000. - - - - -
Engineering Studies 14,667. - 14,667. 11,000. 3,667. - 30,000. - - -
I
I
,
I
I
-~ r
I
c.
- ------ -J[ 1,614,667. I I )[ I 803,667. I )[ I i '\ ~
TOTAL - 1,614,667. 811,000. - 600,000. - ][ 450,883. I - I
J