HomeMy WebLinkAboutExecutive Committee 1979
~ B-1
,
the metropolitan toronto and region conservation authority
minutes REPORT #1/79
EXECUTIVE COMMITTEE WEDNESDAY-FEBRUARY-14-1979 #1/79
The Executive Committee met in the Board Room. Authority Office, 5 Shoreham
Drive, Downsview, on Wednesday, February 14, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
~.J. Breen
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
Dr. T.H. Leith
J.S. Scott
H.G. Westney
Authority Member R. Gillespie
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Hanagement Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & policy Mrs. A.C. Deans
Head, Conservation Education Section, I&E Miss A. Hayhoe
Planning Technician, Planning & Policy B.E. Knox
Development Co-ordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
Supervisor, Accounting Services, FD Mrs. M. Mosseau
Senior Administrative Secretary Mrs. M. Mitchell
HEARING:
Following the Roll Call, the Meeting recessed to hold a Hearing re:
Town of Caledon
Humber River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
H.G. Westney
Authority Member R. Gillespie
Secretary-Treasurer K.G. Higgs
Director of Planning, & Policy l'1 .A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Si'tes Division R.K. Cooper
Adm. - Conservation Land Manaaement Division P.B. Flood
B-2 -2- .
.. '
PRESENT FOR THE MEETING (Contd. )
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Executive Secretary Mrs. K. Conron
Research Planner, Planning & Policy Mrs. A.C. Deans
Head, Waterfront Section, WRD B.E. Denney
Head, Conser.v.a~ion Education Section, HE Miss, A. Hayh~e.
Planning Tec~nician, Planning & Policy B.E. Knox'
Development Co-ordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD .. J.C. Mather
Senior Administrative Secretary ,Mrs. M. Mitchell
Supervisor, Accounting Services, FD Mrs. M. Mosseau
Supervisor, Property Administration, P&A D.J. Prince
Project Engineer - Development, F.C. , WRD A.G. Saha,bandu
ABSENT WERE
Members E.H. Card
Mrs. S. Martin
MINUTES
The Minutes of Meeting #22/78 were presented.
Res. U Moved by: Mrs. F. Gell
Seconded by: H.G. Westney
RESOLVED THAT: The Minutes of Meeting #22/78, as presented, be adopted as if
read.
CARRIED;
SECTION I
THE EXECUTIVE COMMITTEE SUB~IITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
l. 1979 BUDGET ESTIMATES
Mr. Scott presented the 1979 Budget Es~imates.
Res. #2 Moved by: Mrs. J.A. Gardner
Seconded hy: M.J. Breen
RESOLVED THAT: The 1979 Budget Estimates, as amended and appended as
Schedul~ "A" of these Minutes, be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 General Budget
Estimates and 1979 Capital Program, dated February 14, 1979, be
adopted; and further in this connection, that the following action be
taken:
(a) All current projects included in the 1979 General Budget Estimat~s
be approved and adopted; and
(b) WHEREAS the Conservation Authorities Act provides 'that for the
carrying out of any Project, an Authority shall have the power to
determine the portion of total benefit afforded to all municipalities
that is afforded to each of them, The Metropolitan Toronto and Region
Conservation Authority therefore enacts as follows:
( i) That all mernber,municipalities be designated as benefiting for
all General Current Projects included in the 1979 General
Current Budget;
(H) The Authority's share of the cost of all General Current
Projects included in the 1979 General Current Budget, as set
forth in the 1979 General Current Budget shall be raised from
all member municipalities as part of the 1979 Annual General
Levy;
(Hi) The 1979 Annual General Levy for Administration, Operations and
Maintenance Programs, Conservation and Recreation Land Manage-
ment an~ the current programs of Water and Relate~ Land Manage-
ment, be apportioned to the participating municipalities in the
portion that the equalize~ assessment of ' the municipalities or
-3- B-3
part bears to the equalized assessment of the whole area under
the jurisdiction of the Authority, unless otherwise provided in
the LeVYi
(iv) The appropriate Authority officials be instructed to advise all
municipalities pursuant to The Conservation Authorities Act
and to levy the said municipalities the amount set forth in the
1979 General Current LevYi
(v) . The Executive Committee be authorized to reduce the said Budget
and Levy, should such action be deemed expedienti
(c) The 1979 Capital Works Program and the 1979 Capital Levy for Projects
included therein and dated February l4, 1979 be adoptedi and
WHEREAS The Conservation Authorities Act provides that an Authority
may, from time to time, determine what monies will be required for
Capital expenditures in connection with any project, and further
provides for the method of raising such monies from the participating
municipalities,
THAT the following action be taken:
(a) All member municipalities be notified of the amount of such
monies they arc required to raise in 1979, on the basis set
forth in the 1979 Capital Works Program and Levies for:
(i) The Interim Water and Related Land Management Project 1979-l98li
(ii) Th~ Metropolitan Toronto and Region Waterfront Project 1977-1981,
proposed to be carried out in 1979i
(iii) Project W.C.-58 - A Project for Erosion Control and Channel
Improvements on the West Branch of the Don River between
Ba~lurst Street and Finch Avenue - The Municipality of
Metropolitan Toronto benefiting.
(b) The appropriate Authority officials be instructed to advise all
municipalities pursuant to The Conservation Authorities Act,
and to levy the said municipalities the amounts set forth in
the 1979 Capital Works Levies.
CARRIEDi
2. APPOINTMENTS TO FUNCTIONAL ADVISORY BOARDS
AND EXECUTIVE SUB-COMMITTEES - 1979
The Chairman presented a communication having regard to appointments to
Functional Advisory Boards and Executive Sub-Committees, advising that
the recommendations were based on indicated preferences, where possible,
on Authority regulations, and in accordance with new rules adopted by the
AuthoritYi and further advising there are 5l members of the Authority
and five advisory boards. The maximum number permitted for each Board is
14.
The Chairman and Vice Chairman of the Authority are ex-officio members of
all Boards and Committees.
Res. #3 Moved by: E.V. Kolb
Seconded by: J.S. Scott
RESOLVED nIAT: The communication of the Chairman having regard to the
appointments to the Functional Advisory Boards and Executive Sub-
Committees for 1979, as amended, be receivedi and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Members recommended to the
various Functional Advisory Boards and Sub-Committees be as indicated and
that per diem and mileage be allowed for attendance at meetings:
(a) CONSERVATION LAND MANAGEMENT
Chairman: Kolb, E.V. Appointees: Bell, R.E.
Vice Chairman: Barber, Wm. G. Bryson, J.A.
Members: Caldwell, S. Gardhouse, G.
Fitzpatrick, R. McDermott, N.
Gillespie, R.S.
Henderson, Gavin
B-4 -4-
(a) CONSERVATION LAND ~~AGEMENT (Contd. )
Members: King, E.
Macpherson, S .A.
McCreary, K.
Yuill. R.F.M.
(b) FLOOD CONTROL & NATER CONSERVATION
Chairman: Scott, J.S. Appointees: Martin, L.
Vice Chairman: Herridge, t'1m. R. ,QC Swann, Wm.
Members: Bean, R.F.
Bell, Mrs. C.
Coutlee, K.
Fleet, D.G.
Fisher, G.
Kline, C.F.
McKechnie, F.J.
Stewart, M.M.R.
Tonks, A.
Westney, H.G.
(c) HISTORICAL SITES
Chairman: Biggar, M.W.H. Appointees: Bradshaw, J.
Vice Chairman: Perkins, F.R. Davidson, W.C.,QC
Members: Jessop, C. Langdon, J.E.
Moran, R.A.P. McGinnis, J .A.
Starr, R. McMeans, Mrs. C.
Walker, Mrs. A. Neil, Mrs. E.
Russell, Dr. L. S .
Scott, Dr. J.W.
(d) INFORMATION AND EDUCATION
Chairman: Leith, Dr. T.H. Appointees: Brown, C.G.
Vice Chairman: Tovell, Dr. W. M . Downing, J.
Members: Card, E.H. D\1nlop, J.
Di Giannantonio, D. James, R.L. , Prof.
Hancey, Mrs. L. Nelligan, B.E.
Johnson, J.D.
Johnson, R.W.
Singh, B.V.
Williams, G.A.
(e) WATERFRONT
Chairman: Breen. M.J. Appointees: Norton, G.
Vice Chairman Ki tchen, D. Pickett, P.B. , QC
Members: Brown, F.J~
Gardner, Mrs. J.A.
Lipton, M.D.
Marshall, Mrs. V.
Martin, Mrs. S.
Pownall, Mrs. N.
Sinclair, B.
Sutherland, Mrs. B.
Trimmer, Mrs. J.
White, D.
EXECUTIVE SUB-COMMITTEES
PERSONNEL Chairman: Hancey, Mrs. L.
Members: Breen, M.J.
Kolb, E.V.
Leith, Dr. T.H.
Martin, Mrs. S.
FINANCE Chairman: Scott, J.S.
Members: Biggar, M.W.H.
Card, E.H.
Gardner, Mrs. J.A.
Kline, C.F.
-5- B-5
RECOGNITION Chairman: Gardner, ~trs. J.A.
Members: Perkins, F.
Stewart, M.M.R.
CONSERVATION Chairman: Kolb, E.V.
FARM Members: *Bell, R.E.
Caldwell, S.
Leith, Dr. T.H.
*Lowe, G.
*Redelmeier, F.M.
*Wall, A.A.
*Denotes Appointment by Authority
EMPLOYEE SUGGESTION AWARD COMMITTEE
Chairman Hancey, Mrs. L. CARRIED 7
In accordance with Rule #6 - Rules for the Conduct of the Authority -
Resolution #88/75, as amended, biographies of persons recommended for
appointment to functional advisory boards are appended as Schedule liB"
of these Minutes.
3. SUPPLEMENTARY PROJECT TO THE METROPOLITAN TORONTO
AND REGION WATERFRONT PROJECT: 1977-l98l
A staff communication was presented advising that by Resolution #7l/78
(Meeting #5/78), the Authority adopted the above project as follows:
"Res. #71
RESOLVED THAT: Section I of Report #15/78 of the Executive Committee
be received; and that the recommendation as contained therein and set
forth herein be adopted:
l. Report #2/78
Waterfront Advisory Board
#2 ~IAT the Supplementary Project to The Metropolitan Toronto and
Region Waterfront Project: 1977-l98l, as appended as Schedule
"A" of the Minutes of the t'llaterfront Advisory Board Meeting
#2/78, be adopted; and
THAT the following action be taken:
(i) The Municipality of Metropolitan Toronto and the Province
of Ontario be requested to approve the Supplementary
Project to The Metropolitan Toronto and Region Waterfront
Project 1977-1981;
(ii) The Municipality of Metropolitan Toronto be designated as
benefiting municipality for the Supplementary Project in
the amount of $496,000.00 for each of the years 1979,1980
and 1981;
(iii) The Province of Ontario be requested to approve a grant of
50% of the costs associated with the Supplementary Project
for each of the years 1979, 1980 and 1981;
(iv) The Municipality of Metropolitan Toronto be requested to
join with the Authority in its endeavour to obtain the 50%
grant for the Supplementary Project from the Province of
Ontario.
CARRIED. A
Funding for the Supplementary Project was proposed on the following basis:
Province
Metropolitan of
Year Toronto Ontario TOTAL
1979 $ 496,000. $ 496,000. $ 992,000.
1980 $ 496,000. $ 496,000. $ 992,000.
1981 $ 496,000. $ 496,000. $ 992,000.
B-6 -6-
The Supplementary Project provides for the continuation of work provided
for in the Waterfront Project, displaced as a result of the acquisition
of the Guild Inn property in 1978, including the high priority shoreline
management work along the Scarborough Bluffs.
The Authority is now in receipt of MA 19/79 setting out the Minister's
approval of grants for 1979. This approval provides for a $l,400,000.00
grant for the Waterfront which does not include the requested grant for
the Supplementary Project. The l-tinister advises that no further funds
will be available in 1979.
Based on this information from the Province, The Municipality of
Metropolitan Toronto has deleted its share of the 1979 portion of the
Supplementary Project from its 1979 capital estimates, but has retained
the 1980 and 1981 portions in its capital estimates.
The Authority's 1979 Budget Estimates have been revised to reflect the
diminished grants available. Priorities have been adjusted to provide
$450,000.00 for shoreline management in 1979.
At Meeting #l/79 of the Authority, the following resolution was adopted:
"RESOLVED THAT: This Authority direct its Executive Committee to
communicate to the Province of ontario, The Municipality of
Metropolitan Toronto and the Borough of Scarborough its desire to
discuss the disposal of a portion of the Guild Inn property in
order to finance the continuation of the Authority's waterfront
erosion control program. CARRIED;"
That the sale of the Guild Inn property to finance shore management works
can be contemplated demonstrates the urgency of the shore management
problem. The modifications made to the 1979 budget alleviates some of tqe
concern, but is, at best, an interim measure, and leaves in an unfinished
state other waterfront works now in progress.
While there is little possibility of additional provincial funding in
1979, the Supplementary Project should be acted on for 1980 and 1981.
Res. #4 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff communication having regard to the Supplementary
Project to The Metropolitan Toronto and Region Waterfront Project: 1977-
1981 be received; and
THE EXECUTIVE COMMITTEE RECO~~ENDS THAT: The Minister of Natural Resources,
The Municipality of Metropolitan Toronto and the Borough of Scarborough, be
advised of Authority Resolution #32/79:
"RESOLVED THAT: This Authority direct its Executive Committee
to communicate to the Province of Ontario, The Municipality of
Metropolitan Toronto and the Borough of Scarborough its desire
to discuss the disposal of a portion of the Guild Inn property
in order to finance the continuation of the Authority's water-
front erosion control program."
IT IS FURTHER RECOMMENDED THAT: The Minister of Natural Resources be
requested to approve the Supplementary Project to The Metropolitan Toronto
and Region Waterfront Project 1977-l98l, and the payment of grants
requested therein for the years 1980 and 1981. CARRIED;
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING 1\C'l'ION TAKEN ON ITEMS 1\DOPTED BY TilE EXECUTIVE COMtUTTEE:
4. DECISION OF HEARING
Town of Caledon
Humber River Watershed
Res. #5 Moved by: C.F. Kline
Seconded by: M.J. Breen
-7- B-7
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this 14th day of February, 1979i and
THAT the application by the Town of Caledon, in accordance with Ontario
Regulation 735/73, for approval in principle to reconstruct the First
Bolton Scout Hut on the land of the Bolton Community Conservation Centre
in Bolton, on Pt. Lot 9, Concession 6, village of Bolton, Town of Caledon -
Humber River watershed - be deferred until such time as the required
hydrological information is available.
CARRIEDi
5. APPOINTMENT TO EXECUTIVE" SUB~COMMITTEE:
1979
Res. #6 Moved by: Mrs. J.A. Gardner
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Mr. Harvey Higgins be appointed to the Kortright Centre
for Conservation Special Committee on Energy.
CARRIEDi
6. THE REGIONAL MUNICIPALITY OF YORK
-Meeting with Council
The Chairman presented a communication having regard to the suggestion of
the Chairman of The Regional Municipality of York, at the Inaugural
Meeting of Regional Council, that Council meet informally with local
'Councils within the Region to discuss local and regional issues. In
accordance with this suggestion, Mr. Henderson indicated to Mr. Forhan
that it would also be appropriate for Regional Council to hold an informal
meeting with the Conservation Authority to discuss conservation issues in
the ~egion. Council has indicated its full agreement with the suggestion.
Res. #7 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Executive Committee, together with the Members of The
Metropolitan Toronto and Region Conservation Authority appointed by The
Regional Municipality of York, and the senior staff, hold an informal
meeting at the Kortright Centre for Conservation on Wednesday, April 25,
1979. CARRIEDi
7. FINANCIAL REPORT AND ACCOUNTS
-December, 1978 (Final Report)
Mr. Scott presented the Financial Report and Accounts for the month o~
December, 1978.
Res. #8 Moved by: J.S. Scott
Seconded by: E.V. Kolb
RESOLVED THAT: The Financial Statement for the month of December, 1978,
as amended, be receivedl and the Authority Accounts in the amount of
$2,302,598.04, being (a) Current Expenditures - Wages and Salaries
$266,836.661 Materials and Supplies $437,96l.371 (b) Capital
Expenditures - Wages and Salaries $22,826.l41 Materials and Supplies
$1,574,973.87, be approved for payment.
CARRIEDi
8. APPLICATION FOR PERMIT UNDER O.R. 735/73
Bell Canada
To cross a tributary of the Rouge River with proposed buried
conduit, just south of victoria Avenue, east of Kennedy Road,
Town of Markham
A staff communication was presented advising that an application has been
received for a permit to cross a tributary of the Rouge River with a
buried conduit at the above location.
Res. #9 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Bell Canada be received 1 and
B-S -8-
THAT the applicat,ion of Bell Canada for a permit to cross a tributary of
the Rouge River with a proposed buried conduit in the area just south of
Victoria Avenue, east of Kennedy Road in the Town of Markham in The
Regional Municipality of York (Rouge River watershed), be approved,
subject to:
(a) All areas disturbed due to construction being restored to
the satisfaction of the Authority:
(b) The Town of Markham engineers being satisfied with the
proposed restoration works:
(c) Every effort being made to minimize the silting of the
river during construction.
CARRIED:
9. APPLICATION FOR PERMIT UNDER O.R. 735/73
City of Mississauga
To undertake remedial works on the eroding banks of the
Little Etobicoke Creek between Dixie & Burnhamthorpe Roads
A staff communication was presented advising that an application has been
received for a permit to undertake remedial works on the eroding banks of
the Little Etobicoke Creek at the above location.
Res. no Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
the City of Mississauga be received: and
THAT the application of the City of Mississauga for a permit to undertake
remedial works on the eroding banks of the Little Etobicoke Creek along
the stretch between Dixie Road and Burnhamthorpe Road, City of Mississauga
(The' Regional Municipality of Peel), Etobicoke Creek watershed, be
approved, subject to:
(a) All rip-rap work being preceded by a filter mat or a 6"-l2" layer
of crushed stone:
(b) The rip-rap stone size being approximately lO"-l2" in diameter,
that' is to say "one man stone":
(c) Every effort being made to minimize the silting of the creek
during construction;
(d) Replanting being undertaken in areas disturbed by the construction;
( e) All areas disturbed due to construction being restored to the
satisfaction of the Authority:
CARRIED:
lO. APPLICATION FOR PERMIT UNDER O.R. 735/73
The Regional Municipality of Durham
To place a culvert to carry a watercourse under the proposed
Bayly Street Extension, just east of West Shore Boulevard,
Town of Pickering (Waterfront)
A staff communication was presented advising that an application has been
received for a permit to place a culvert to carry a watercourse, which
drains into Frenchman Bay, under the proposed Bayly Street Extension at
the above location.
Res. #11 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
The Regional Municipality of Durham, be received: and
THAT the application of The Regional Municipality of Durham for a permit
to place a culvert to carry a watercourse under the proposed Bayly Street
Extension in the area just east of West Shore Boulevard, Town of Pickering,
(The Regional Municipality of Durham), be approved, subject to:
(a) All gabion works being preceded by a filter mat or a 6"-l2"
layer of crushed stone;
(b) Every effort being made to minimize the silting of the watercourse
durinq construction:
-9- B-9
(c) Any fill proposed at the south-east corner of Bayly Street and
West Shore Boulevard being properly compacted and not
obstructing the flow in the watercourse, particularly during
flood flows;
(d) The Authority being approached for comments on the methodology
used in placing and stabilizing any fill as stated in condition (c);
(e) All areas disturbed due to construction being restored to the satis-
faction of the Authority.
CARRIED;
ll. APPLICATION FOR PERMIT UNDER O.R. 735/73
Ministry of Transportation & Cornn\unications
To channelize a tributary of the West Don River and a section
of the West Don, just south of Highway #7, west of Dufferin
Street, to alleviate flooding at Highway #7 resulting from
undersized tributary; and to develop proper drainage
capacities for proposed Highway #407 crossing of the Don River
A staff communication was presented advising that an application has been
received for a permit to undertake the channelization of a tributary of
the West Don River and a section of the West Don at the above location.
Res. #l2 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
the Ministry of Transportation and Communications be received; and
THAT the application of The Ministry of Transportation and Communications
for a permit to undertake the channelization of a tributary of the West
Don River and a section of the West Don River in the area just south of
Highway #7, west of Dufferin Street, Town of Vaughan (The Regional
Municipality of York), Don River watershed, be approved, subject to:
(a) This approval applying only to the channelization for the lO-year
flood and not to the ultimate design as proposed;
(b) Separate approval being requested at such time as the Highway #407
design is prepared;
(c) Every effort being made to minimize the silting of the river during
con:;truction;
(d) All areas disturbed due to construction beinq restored to the satis-
faction of the Authority and of the Town of Vaughan;
(e) The detail design of the channel 'being approved by The Metropolitan
Toronto and Region Conservation Authority;
(f) All the necessary property easements and approvals being obtained
by the Ministry of Transportation & Communications.
CARRIED;
12. WATERFRONT PROJECT 1977-l98l - SCARBOROUGH SECTOR
Property: Grace Ellis
Res. #l3 Moved by: Dr. T.H. Leith
Seconded by: Mr. M.J. Breen
RESOLVED THAT: The Report (February l. 1979) set forth herein, receiv,ed
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase. '
CARRIED ;.
liRe: Project: WATERFRONT PROJECT 1977-l98l
Scarborough Sector
Authority: Executive Resolution No. 460, Meeting No. 23 -
January 2l, 1976 and Authority Resolution No.46,
Meeting No. 3 - April 9, 1976 .
Subject Property: 33 Kingsbury Crescent
Owner: Grace Ellis
Area to be acquired: 0.582 acres, more or less
Recommended Purhcase Price: $60,000.00, plus Vendor's legal costs
B-lO -10-
"Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being All of Lot 17 and Part of Lot 18, Registered
Plan 2030, Borough of Scarborough, The Municipality of Metropolitan
Toronto, having a frontage of approximately 56 feet on the south side of
Kingsbury Crescent, west of Birchmount Road.
"Situate on the property is a detached, two-bedroom, brick dwelling with
an attached single-car garage.
"Negotiations have been conducted with the owner and her solicitor, Mr.
G.H. Lovatt, Q.C., of the legal firm Kingsmill, Jennings, Suite 8l0,
III Richmond Street West, Toronto, M5H 2Jl and, subject to the approval of
your Committee, agreement has been reached with respect to a purchase
price as follows:
The purchase price is to be $60,000.00, plus Vendor's legal costs,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the transaction. All reasonable
expenses incurred incidental to the closing for land transfer tax, legal
costs and disbursements are to be paid. The Authority is to receive a
conveyance of the land required free from encumbrance.
"The Administrator of the ~"later Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An applciation has been made to the Ministry of Natural Resources for an
Inspection Certificate."
13. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l:
HUMBER VALLEY WATERSHED COMPONENT
Property: R.K. Stanley
Res. #!4 Moved by: C.F. Kline
Seconded by: J.S. Scott
RESOLVED THAT: The Report (January 3l, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase. CARRIED 1
"Re: ~rQject: Interim Water and Related Land Management Project
1979-l98l - Flood Plain and Valley Land Acquisition
Authority: Component - Humber valley Natershed
Executive Resolution No. 133, Meeting No. 4 -
April 12, 1978 and Authority Resolution No. 51,
Meeting No. 3 - April 2l, 1978
Subject Property: North side of Kirby Road
Owner: R.K. Stanley
,.
Area to be acquired: l7.94 acres, more or less
Recommended Purchase Price: $2,500.00 per acre, i.e.
$44,850.00, plus Vendor's legal costs
"Included in the requirements for the above-noted project is an irregular':'
shaped parcel of land, being Part of Lot 32, Concession VIII, Town of
Vaughan, The Regional l1unicipality of York. being a partial taking from a'.
larger property fronting on the north side of Kirhy Road, east of HighWay,
#27, in the vicinity of Kleinburg. In addition to the parcel being
acquired, the Authority is to receive a 20 foot right-of-way extending
northerly from the Kirby Road to the parcel being purchased at this time.:,
"Negotia tions have been conducted with the owner and her solicitor, Mr. "
Walter G. Baker, Barrister and Solicitor, 5179 Yonge Street, Willowdale,
Ontario, M2N 5P5 and, subject to the approval of your Committee, agreement
has been reached with respect to a purchase price, as follows:
The purchase price is to be the sum of $2.500.00 per acre, i.e.,
$44,850.00, plus Vendor's legal costs, with date of completing
the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the transaction. All reasonable
expenses incurred incidental to the closing, for land transfer tax, legal
costs and disbursements are to be paid. The Authority is to receive a
conveyance of the land required free from encumbrance.
-11- B-11
"The Admini.strator of the \\later Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An applicai:ion has been made to the Minister of Natural Resources for
an Inspection Certificate."
14. INTERIM WATER & RELATED LAND ~mNAGEMENT PROJECT 1979-l98l:
Duffin Creek \\Iatershed Component
Property: Fay Mavis Bayly
Res. #15 Moved by: Dr. T . H. Le i th
Seconded by: E.V. Kolb
RESOLVED THAT: The Report (February l, 1979) set forth herein, received
from the Property Administrator. be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re: Project: Interim Water and Related Land Management Project
1979-l98l - Upper valley Conservation Land Acquisition
Component - Duffin Creek Watershed
Authority: Executive Resolution No. l33, Meeting No. 4 -
April 12, 1978 and Authority Resolution No. 5l,
Meeting No. 3 - April 2l, 1978
Subject Property: East side of Road Allowance between Concessions
V and VI, Township of Uxbridge
Owner: Fay Mavis Bayly
Area to be Acquired: 51.99 acres, more or less
Recommended Purchase Price: $l42,972.50, plus Vendor's costs
"Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being Part of Lot 3, Concession VI, Township of
Uxbridge, The Regional Municipality of Durham, having a frontage of
approximately 660 feet on the east side of the Road Allowance between
Concessions V and VI, north of the Pickering/Uxbridge town line, in the
Glen Major area. \ subject to the
"Negotiations have been conducted \'lith the owner and,
approval of your Committee, agreement has been reached with respect to a
purchase' price, as follows:
The purchase price is to be the sum of $l42,972.50, plus Vendor's
costs, with date of completing the transaction to be as soon as
pos,sibl e.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing. for land transfer tax,
legal costs and disbursements are to be paid. The Authoritv is to rece~ve
a conveyance of the land required free from encumbrance. -
"The Administrator of the \'later Resource Division has revie\'led this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
15. EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
-Proposed Remedial Work - Enfield Avenue/Sunset Avenue/Jellicoe
Avenue Vicinity - Borough of Etobicoke (Etobicoke Creek
Wa tershed)
A staff communication was presented having regard to proposed toe
protection work scheduled to be carried out at the above location.
Res. #16 1010ved by: Mrs. J.A. Gardner
Seconded by: H.G. Westney
RESOLVED THAT: The staff communication on Erosion Control and Slope
Stabilization in Metropolitan Toronto - proposed remedial work in
the Enfield/Sunset/Jelli.coe Avenues vicinity, Borough of Etobicoke
(Etobicoke Creek watershed) be received: and
THAT the staff be directed to carry out toe protection work in the
Enfield, Sunset and Jellicoe Avenues' vicinity at an estimated cost
of $68,000.00;
AND FURTHER THAT the Ministry of Natural Resources be requested to approve
-" . '--- ~ - - -- --,-
r ~ . . t "'.
B-l2 -l2-
lG. EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
-Final Geotechnical Engineering: Rear of No. 10 Codeco Court,
Borough of North York (Don River Watershed)
A staff" communication was presented having regard to major remedial work
at #lO Codeco Court which is scheduled to commence this year.
Res. #l7 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff be authorized to retain the firm Geocon (l975)
Limited, Consulting Geotechnical Engineers, to carry out the final geo-
technical engineering requirements for the proposed erosion control and
slope stabilization work at No. lO Codeco Court. Borough of North York
(Don River watershed), at a cost estimated to be $8,000.OO~ and
THAT the Ministry of Natural Resources be requested to approve this work.
CARRIED~
17. SLOPE STABILIZATION WORK - DON VALLEY DRIVE
-Change Order No.l
A staff communication was presented having regard to slope stabilization
work at the above lecation, and advising that the following extra items
were found necessary because of the field conditions encountered and the
difficult access to the work site:
Change Order No. 1
Variation from Quantity Estimate $2,706.30
Additional Work - Gabion Walls 3,l90.00
End Slope Treatment 244.68
Tax Adjustment 57.6l
$6,l98.59
Res. #l8, Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Change Order No. 1 to the contract for'slope stabilization
work at Don Valley Drive. carried out by Tirnbergate Engineering Limited,
in an amount of $6,l98.59, be approved~ and
THAT the approval of the Province of Ontario be requested.
CARRIED~
18. PROPOSED MACHINE RENTALS - 1979
A staff communication was presented advising that seventeen quotations
were requested and received for machinery rentals for 1979 for the
Water Resource and Conservation Land Management Division works programmes.
Res. #l9 Moved by: C.F. Kline
Seconded by: E.V. Kolb
RESOLVED THAT: The Water Resource Division and the Conservation Land
Management Division retain the services of Sartor & Susin Limited and
Mark O'Connor for the rental of construction machinery during 1979, theirs
being the two lowest quotations received~ and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED~
19. COASTAL ENGINEERING DESIGN AND CONSTRUCTION CONFERENCE
-Attendance at
A staff communication was presented advising that the Canadian Society of
Civil Engineers is, sponsoring a Coastal Engineering Design and
Construction Conference in Kingston, Ontario, on April 20, 1979. The
program includes a number of topics related to shoreline management and
erosion control. There will also be discussion on the design and
construction of marinas and small craft harbours.
-l3- B-13
Res. #20 Moved by: Mrs. L. Hancey
Seconded by: E.V. Kolb
RESOLVED THAT: lolrs. J.A. Gardner and Messrs. M.J. Breen. M.R. Garrett and
D.E. Denney be authorized to attend the Coastal Engineering Conference in
Kingston, Ontario, on April 20, 1979; and
THAT their expenses in connection therewith, in an amount estimated to be
$250.00. be paid. ' CARRIED;
20. APPLICATION FOR PERMIT UNDER O.R. 735/73
Con-Drain Company Limited
To undertake construction of storm sewer outfall into the
Don River south of Langstaff Road, west of Dufferin Street,
Town of Vaughan
A staff communication was presented advising that application has been
received from Con-Drain Company Limited for a permit to construct a storm
sewer outfall into the Don River at the above location.
Res. #21 Moved by: C.F. Kline
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the application of
Con-Drain Company Limited, be received; and
TI~T the application of Con-Drain Company Limited for a permit to under-
take the construction of a storm sewer outfall into the Don River, in
the area south of Langstaff Road, west of Dufferin Street, Town of Vaughan
(The Regional Municipality of York), Don River watershed, be approved,
subject to:
(a) ~he headwall being aimed in a more downstream direction;
(b) M. H. Number 4 being equipped with a water-tight cover;
( c) A gabion basket being placed upstream and downstream of
the headwall structure to protect it from erosion;
(d) The ~ank to the creek being properly stabilized and
covered after construction;
( e) All areas disturbed due to construction being restored
to the satisfaction of the Authority;
(f) Every effort being made to prevent the silting of the
creek during construction;
(g) An easement being obtained to enter and do work on
Authority-owned land.
CARRIED;
2l. CENTRAL WATERFRONT MARINA PROJECT
-Referral from City of Toronto Committee on
Parks, Recreation and City Property
A staff communication was presented advising that the Authority is in
receipt of a communication from the City of Toronto Committee on Parks,
Recreation and City Property wherein they considered a report prepared by
the Central Waterfront Planning Committee of alternative marina sites in
the Outer Harbour area.
Res. #22 Moved by: Mrs. J.A. Gardner
Seconded by: M.J. Breen
RESOLVED THAT: The report on the Central Waterfront Marina project, as
referred by the City of Toronto Committee on Parks, Recreation and City
Property, be received and forwarded to the City of Toronto.
CARRIED;
B-14 -14-
22. MR. HIGGS advised that confirmation ha's been received from the Borough of
Etobicoke of its invitation to the Authority to hold Authority Meeting
12/79 (Budget) a t the, .Etobicok e Civic Centre.
23. At the reques~ of MR~ SCOT~, the staff will arrange to hold an Executive
Meeting at or a tour of the Guild Inn in the spring of this year.
24. ADJOURN~tENT :
On Motion, the Meeting adjourned at 2:15 p.m., February l4.
R.G. Henderson K.G. Higgs
Chairman Secretary-Treasurer
THE f1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
1 9 7 9 BUD GET EST I MAT E S
FEBRUARY 141 1979
tn
n
:r:
t';I
c
C
t"'
t':I
al
= I
)0....
=U1
THE METROPOLITAN TORONTO a REGION CONSERVATION AUTHORITY
1979 BUDGET ESTIMATES
.. "
, .
WATER a RELATED LAND
MUNICIPAL LEVY MANAGEMENT
$ 5,077,368 40.4 0/0 $4,696,157 37.3%
WATERFRONT
$2,800,000 22,2%
PROVINCE OF ONTARIO
$ 4, 696, 195 37.3 0/0
OPERATION a MAINTENANCE
$ 3,223,,600 25.6%
REVENUE
$2,344,000
18.6%
FOUNDATION a 'WINTARIO CONSERVATION a RECREATION
$ 281,472 2.2% $466,000 3.7 0/0
SOURCES OF FUNDING ALLOCATION OF FUNDS
THE r1ETROPOLITAN TQRONTO AND REGION CONSERVATION AUTHORITY
1979 BUDGET ESTIMATES
I N D E X
PAGE(S) PAGE(S)
1 - 3 Budget Report WATER & RELATED LAND MANAGEMENT
4 Budget Summary
5 Municipal Levies 25 - 32 Interim Project
6 Basis of Apportionment of Municipal Levies
CONSERVATION & RECREATION LA~D K~NAGEMENT
ADMINISTRATION
33 - 34 Conservation Areas - Support
7 - 8 Administration 35 - 36 Conservation Areas - Development
37 - 38 Conservation & Niagara Escarpmant Land
OPERATIONS & MAINTENANCE 39 - 40 Information & Interpretive Program
41 - 42 Rent & Utilicies
9 - 10 General Operations 43 - 44 Taxes and Insurance
11 - 12 Conservation Area Operations 45 - 46 Waterfront Support
13 - 14 Information & Education Operations
15 - 16 Black Creek Pioneer Village SPECIAL PROJECTS
WATER & RELATED LAND MANAGEMENT 47 - 48 Waterfront Plan
17 - 18 Operations & Maintenance of Water Control Structures HISTORIC SITES
19 - 20 Comrnuni~y Relations - Support
21 - 22 Community Relations - Development 49 - 50 Historic Sites Development
23 _. 24 Taxes & Insurance
1 9 7 9 1.
CUR R E N T AND CAP I TAL BUD GET EST I MAT E S
AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES
The Metropolitan Toronto and Region Conservation Authority has adopted a program designed to further the conservation,
restoration, development and management of the natural resources of the 1.339 square miles included in the Authority's
area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the
headwater areas of the Oak Ridges interlobate moraine, and the Niagara Escarpment as the major resources to which its
programs are applied.
Established resource management programs include flood control and water conservation, erosion control, waterfront devel-
opment, and fish and wildlife management. In implementing these programs, 26,137 acres of land have been acquired and,
in addition to their being managed for the conservation functions they perform, they are made available to the community
for outdoor and conservation education. recreation and historic sites purposes.
Within these comprehensive program guidelines, the Authority has. over the years, reflected the priorities and policies
of the partners, the participating municipalities and the Province of Ontario as expressed through the representative
Authortty members. Since 1957, 66% of the Authority's capital and development budget has been devoted to Water and
Related Land ~!anagement, 19% has been devoted to Lake Ontario Shoreline Management, 13% to Conservation and Recreation
Land Managemenc and 2% to Outdoor and Conservation Education.
The 1979 Budget Estimates for administration. operations and maintenance, current and capital programs reflect the emphasis
on Flood Control and Water Conservation. provide for the management of lands and facilities acquired and developed in
connection with this program. and continue the approved Waterfront project at a reduced rate.
FORMAT OF PRESENTATION
These budget estimates are in accordance with the requirements of The Ministry of Natural Resources "Policy. Procedure and
Information Manual for Conservation Authorities".
There are five major types of Provincial grants available through the Ministry of Natural Resources to Conservation
Authorities.
l) Administration 4) Special Projects and Programs
2) Water & Related Land Management 5) Supplementary Grants (not applicable to M.T.R.C.A.)
3) Conservation & Recreation Land Management
AUTHORITY PROGRAMS 2.
The Authority Programs in these Preliminary Budget. Estimates are in seven basic categori~s:-
1) Administration 4) Conservation & Recreation Land Mana~ement
Administration a) Conservation Areas - Support
b) . Conservation Areas - Development
2) Operations & ~aintenance c) Conservation & Niagara Escarpment Land
d) Conservation Area Information & Interpretive Program
a) General Operations ~~ ,Rent & Utility Services
b) Conservation Area Operations Taxes. Insurance etc...
c) Information & Education Operations g) Waterfront - Support
d) Black Creek Pioneer Village Operations
5) Special Projects
3) Water & Related Land Management Waterfront Plan
a) Operation & Maintenance of Water Control Structures
b) Community Relations - Support 6) Historic Sites
c) Community Relations - Development
d) Taxes; Insurance etc... Historic Sites Development
e) Interim Water & Related Land Man. - Current & Capital
Expenditures on administration. operations and maintenance and current .programs comprise the Authority's General Levy on all
participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario. Expen-
ditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in the specific
projects.
WATERFRONT PROJECT
In 1977 the Authority commenced the second phase of the Waterfront Project. Originally this phase proposed expenditures of
$4,400.000 per year over the five year period 1977-1981.
Expenditures for 1977 and 1978 were $14,363,475 (including the acquisition of the Guild Inn). The Province has allotted
$1.400.000 to this project in 1979. which will permit a total expenditure of $2.800.000.
INTERIM WATER & RELATED LAND MANAGEMENT PROJECT
The year 1979 is the first year of the three year Interim Water and Related Land Management Project. This project will enable
the Authority to establish and undertake a program designed to conserve. restore. develop and manage the natural resources of
the Watersheds within the area of its jurisdiction, in accordance with the Water and Related Land Management Plan.
3.
The Provincial Cash Flow, which has been authorized for Water and Related Land Management work in 1979. has required a reduction
in the Interim Water and Related Land Management Project. The acquisition of flood plain and conservation lands has.been
altered to accommodate the reduction.
THE 1979 LEVY
The apportionment of the 1979 Municipal Levies is based on the 1977 assessment data for 1978 taxation purposes. as supplied
by the Province of Ontario.
In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham. Peel and York will be levied
an amount equal to 100% of the 1978 taxes paid by the Authority for revenue producing conservation areas within those munici-
palities. Within Metropolitan Toronto. Authority lands are not subject to taxation.
PROVINCIAL FUNDING
The Provincial Grant structure used in these estimates is:- Administration 50%
Water & Related Land Management 55%
Conservation & Recreation Land Management 50%
Waterfront Plan 50%
The Province of Ontario has established the following level of funding for The Metropolitan Toronto and Region Conservation
Authority for the 1979 fiscal year. Comparative figures for 1978 are also shown:-
Increase
1978 1979 (Decrease)
$ $ $
(1) Administration 603.000 638.500 35.500
(2) Water & Related Land Management 2.290.200 2,284,850 (5.350)
(3) Conservation & Recreation Land Management 233.000 233.000 -
3.126,200 3.156,350 30.150
(4) Special Projects - Waterfront 1.400.000 1.400.000 -
- Guild Inn 4.220,000 - (4.220.000)
8.746.200 4,556.350 (4.189.850)
1 9 7 9
BUDGET SUMMARY 4.
1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS ( 1978 BUDGET I
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITuRES REVENiJES
EXPENDITURES GRANT LEVY
ADmNISTRATION I
Administration 1.347,000 70.000 1.2.77,000 638.500 638.500 - 1.244.548 91.379 1.270.500 70.000
OPERATIONS & ~IA Il\'TENANCE
General Operations 112,000 16.500 95.500 - 85.500 10.000 146.875 70,984 112.000 14,000
Cons. Area Operations 1.370.800 710.000 660.800 - 660,800 - 1.268.713 753.564 1.304.400 I 753.400
I
Community Relations & Education 851,800 755,500 96,300 18.000 73,300 5,000 764.036 627.069 709.500 I 591.500
Black Creek Pioneer Village 889,000 750,000 139,000 72,000 67.000 - 877,810 773,296 854.000 i 710,000
3.223.600 2,232.000 991.600 90.000 886,600 15,000 3.057.434 2.224.913 2.979.900 2.068.900
I~ATER 1\ RELATED LAND ~IANAGE~1El\'T i
I
184.000 I I I
I
Op~r. & ~bint. of W.C. Structures - 184.000 101.200 82,800 - 160,739 - 159.000 ! - I
I
Community Relations - Support 239,000 - 239.000 131.450 107.550 - 238,108 - 233,000 I - I
Community Relations - Development " 476.194 - 476.194 41.800 34.200 400.194 266,649 - 288.000 I - I
Taxes & Insurance 198.000 - 198.000 108.900 89,100 - 199,341 - 184.000 - . I
1.097.194 - l,097~194 I 383.350 313.650 400.194 864,837 - 864.000 -
INTERIM WATER PROJECT 313,000 I I
Current 453,000 15.000 438,000 240.900 197.100 318,330 I
- - 15.000 I
Capital - All Ben. ~~nicipa1ities 1.369,273 - 1; 369 ;273 753,100 616,173 - 2.772.757 - 2,602.770
Capital - Ben. Municipalities 1.776.690 27.000 1,749.690 957,345 792,345 - 1.007.021 22,469 972 .000 15~000 I
3.598,963 42.000 "3.556.963 1.951.345 1.605.618 - 4.098.108 22,469 3.887,770 30.000
CONS. & RECREATIO~ Lfu~D ~~NAGEMENT I
Cons. Areas - Support 143.500 - 143.500 I 71.750 71,750 I - 126,235 - 126.500 -
Cons. Areas - Development 126.500 - 126~500 I 63.250 63,250 - 217,264 - 213,500 -
Icons. & Niagara Escarp. Land - - - - - 449,712 - 449,715 -
Information & Interpretive 21.000 - 21,000 I 10,500 10.500 - 21,296 - 21.000 -
IRent & Utilities 39.000 - 39,000 19.500 19,500 - 36.503 - 38.000 -
I
ITaxes & Insurance 70,000 - 70,000 35.000 35,000 - 68,178 - 67.000 -
400.000 - 400.0001 200.000 200.000 - 919.188 - 915.7151 -
I-
1~i\TERFRONT I i
I
~aterfront - Support 66.000 - 66,000 33.000 33.000 - 58,889 - 60,000 -
Waterfront - Capital 2.800.000 - 2.800.000 I 1,400.000 1.400,000 - 11.486,993 - 11.439.578 -
:
T I I
i
HISTORIC SITES DEVELOPMENT I I I
'Ii' . S' I
IstorlC ItcS 60.000 - 60.000 - - 60.000 I 51,557 - 84,000 -
I I
I i
I
I I
I
I
I
Total Current 6.646,794 2.317,000 4,~29.794 1.585.750 2.268,850 475,194 6.514,783 2,316.292 6,487.115 2,153.900
Total Capital 5.945.963 27.000 5.918.963. 3.110.445 2.808.518 - 15,266.771 22.469 15.014.348 15.000
l ,
12.592.757 2,344,000 10.248,757 4.696,195 5,077.368 475,194 21.781.554 2.338.761 21.501,463 2.168.900
5.
. THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
COMPUTATION OF 1979 LEVIES
GENERAL PROJECTS - INTERIM WATER & RELATED LAND MANAGEMENT PROJECT - WATERFRONT
1979 Levy 1979 Total 1978 INTERIM WATER & RELATED PROJECT
Before Tax Levy Incl. Total Incl. Capital Capital Waterfront Plan
Tax Adjust. Adjust. Tax Adjust. Tax Adjust. Current All Ben. Ben. Mun. Total 1977-1981
$ $ $ $ $ $ $ $ $
Adja1a 190 - 190 183 19 58 - 77 52
Durham 31.629 42.536 74.165 71.112 3.080 9,629 11.250 23.959 21.909
Metro l.660.497 - l.660.497 1.667.324 170.411 532.739 522,345* 1.225,495 l.3l5.347
Mono 185 - 185 184 19 58 - 77 48
Peel 128.610 69,782 198.392 189.708 12.50~ 39.l07 45,000 96.616 29.564
York 112.091 26.230 138.321 132,l89 11.062 34.582 213.750 259.394 33.080
l.933.202 138.548 2.071.750 2.060.700 197,lOO 6l6,l73 792,345 1.605.618 1.400,000
* This figure includes $49.845. being Metro's share of costs of WC-58 Extension.
BASIS OF APPORTIO~NENT - ~UNICIPAL LEVY
BASED ON THE LATEST EQUALIZED ASSESSrlENT fIGURES AVAILABLE TO T~E AUTHORITY 6.
(i9// ASSeSSMeNT UA1A rUK 1~/~ fAXATiUN PUKPUS~S)
I Tot~tl % of I Equali2;ed Population
Equalized Municipality Assessment Total In
Municipalitv Assessment In Authority In Authority Population Authority
l,OOO's of $'s l,OOO's of $'s
Adjala Township 41,103 8 3,288 3,494 279
Durham, Regional Municipality of 699,621 * 546,880 64,603 51,197
~etropolitan Toronto 28,710.379 100' 28,710.379 2,l47,852 2,147,852
Mono Township 63,984 5 3,199 3,856 192
Peel, Regional ~unicipality of 5,298,268 * 2.223,697 401.300 171,853
York.. Re~ional Municipality of 2.293.334 * 1,938,075 154,674 124,925
I
37,106,689 33,425,518 2,775,779 2,496,298
ANALYSIS OF REGIONAL MUNICIPALITIES
Durh~~, Regional Municipality of 218.262
Ajax Town 86 187,705 22,318 19.193
Pickering Town 352,26l 95 334,647 31,541 29,963
Uxbridge Town 129,098 19 24,528 10,744 2.041
699,621 546,880 64,603 51,197
Peel, Regional Municipality of
Brampton, City of 1,373.229 63 865,134 114,290 72,002
Mississauga, City of 3.637.307 33 1,200,311 263,652 87.005
Caledon Town 287,732 55. l58,252 23,358 12,846
5,298,268 2,223,697 401.300 l71,853
York, Regional Municipality of
Aurora Town 15l,625 4 6,065 14,703 588
Markham Town 880,432 100 880,432 59,204 59,204
Richmond Hill Town 41?,203 99 408,080 35.150 34.798
Vaughan Town 481,122 . 100 481,122 l8.308 18,308
Whitchurch-Stouffville Town 160 . o~n 43 68.837 13.044 5,608
King Township 207.865 45 93.539 14,265 6.419
2.293,334 l.938.075 154,674 124,925
* NOT AVAILABLE IN TOTAL
1979 CURRENT BUDGET ESTIMATES
PROGRAM Administration PAGE 7.
PURPOSE: To provide the administrative and financial services of the Authority.
1979 OBJECTIVES: The continuation of general administration and financial support services for all Authority
programs. Salaries of senior administrative staff and associated secretarial. Administrators -
the Finance Division and Property and Administration Division. are charged to this program
together with employee benefits for all employees.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: The budget estimates inc1ude:-
_ an increase in salaries and wages of approximately 6%
_ an increase in costs to cover the increased benefits of O.M.E.R.S. Pension Plan & O.H.I.P.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Employee Supplies & Real Services Financial
& Wa~es Benefits Utilities Equipment Property & Rents ~ Expenses Total
$ $ $ $ $ $ $ $ $
560.150 440.500 158.750 - - 187.500 100 - 1.347.000
1979 CURRENT BUDGET ESTIMATES
PRCG~AM ADmNISTRATlO~ P~GE 8.
-------
I( ---
I 1979 BUDGET SOURCES OF FINANCING 1978 I\CTUALS 1978 BUDGET
I :'CTIVITY EXPENDiTUR~ REVENUES NET I! PROV!r\CIt.l I MUNICiPAL OTHER EXPENDiTURES REV Ef-:UES EXPa>.:DITUR~ REVE!\:'JES
EXPENDITURES GRANT lEVY
I
isalaries 560.150 - 560,150 280,075 280.075 - 530.900 - 534.000 -
rmPIOyee Benefits 440,500 - 440.500 220,250 220.250 - 399,301 - 424.000 -
Travel Expenses 97.500 - 97.500 48.750 48.750 - 87.093 - 89,000 -
iEquipment Purchase & Rental 36,000 - 36.000 18.000 18,aOO - 25.358 - 33,000 -
fbtcrials & Supplies 81.500 - 81.500 40,750 40.750 - 72 . 843 - 75.000 -
Rent & Utility Services 77 .250 - 77.250 38.625 38,625 - 78,344 - 68.000 - I
General Expenses 54.100 70.000 (15,900) (7.950) (7,950) - 50.709 91.379 47.500 70.000
I
I .\
I I
I
I
( TOTAL )( 1.347.000 I 7Q.000 I 1.277.000 )( 638.500 I 638.500 I - )( 1,244.548 I 91.379 )( 1.270,500 I 70.000 )
-. "
1979 CURRENT BUDGET ,""ESTIMATES
PROGRAM Operations and Maintenance - General, Operations PAGE 9.
PURPOSE: To provide administrative support services, not eligible for a Provincial Grant.
1979 OBJECTIVES: _ to fund the maintenance of revenue producing properties and other general maintenance
_ to fund the public liability insurance on vehicles and equipment
_ to fund renovations to the Head Office Administration Building
_ to fund the office cleaning and maintenance
_ to fund the Authority's share of vehicles and equipment
FUNDING: Program revenues. the General Levy on all participating municipalities and Authority funds.
No Provincial Grant is available for this program. ".'
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wa~es Utilities Equipment Property & Rents ~ Expenses Total
$ $ $ $ $ $ $ $
- 32.500 5.000 - 74.500 - - 112.000
1979 CIJRB~NT BUDGET EST I i\ii ATES
PRO:iRAM OPERATIO~S & ~IAINTENr\NCE - GENERAL OPER:\TIO~S FAGE 10,
r 1 EX?ENOiTUR~ 1979 BUDGET If SOURCES OF FINANCING----" 1978 ACTUALS 1978 BUDGET )
I ~CTIVITY REVENU!::S NC""':" I PROViNCIAL I MU:-.JICIPAL OT:-iER I EXFE!I;DITURES REVENUES I EXP~DliU:;.::S I R~"'"~~IJES
I EX?E~jDTTuRES GRANT , LEVY
I Rental Property Mainten- I I I I i
I
lance - Revenue Producing
i Pro pert ies I; General
~Iailltenance 32.500 16.500 16,000 - 16,000 - 32.388 21.194 24.500 14.000
IV'hiel' , 'quIp. Su''''''''' 5.000 - 5.000 - 5,000 - 19.358 - 5.000 - .
Insurance 12,000 - 12 , 000 - 12,000 - 8.839 - 17,000 . - I
. lie ad Office Renovations I 10,000 10,000 10.000 26.602 I
- - - - 10.000 - I
I Flood Control l1iorkshop 1.500 - 1,500 - 1.500 - 1.088 - 1,500 -
I Office' Cleaning 19.000 - 19.000 - 19,000 - 15.317 - 17,000 -
I Office Mliintenance 32.000 - 32,000 - 32,000 - 43.283 - 37,000 -
i I
I - - - - - - - 49.790 - -
I
I I
I I I
I
! I
i ,
I
I
I
J
( TOTAL )( 112.000 I 16.500 I 95,500 )( - I 85,500 I 10.000 )( 146.875 ! 70.984 )( 112.000 I 14,000 )
1979 CURRENT BUDGET ESTIMATES.
PROGRAM Operations & Maintenance - Conservat~on Area Operations PAGE 11.
PURPOSE: The conservation and management of lands under the jurisdiction of the Authority and the
provision of outdoor recreation opportunities.
1979 OBJECTIVES: _ the management and operation of 17.000 acres of Authority lands including 13 conservation areas.
which will provide 1.5 million user days of recreation .,
_ due to continued budget limitations. the 1979 estimates provide ,for the same level of maintenance
of service as in previous years. This reflects adjustments in Authority priorities. Selective
use and management of Authority lands is required to maximize use and minimize costs.
- to provide self-supporting visitor services
FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial grant
is available for this program.
FINANCIAL COMMENTS: In 1978. budgetted revenues were met because of excellent weather. conditions. continued interest
in the Albion Hills winter program and the addition of the Bruce's Mill winter program. In
1979. projected program revenues have been estimated to be higher than 1978. reflecting some fee
changes and increased program revenues.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies'& Real Services Financial
& Wap;es Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ ,$ $
822.125 224.785 121.690 - 17.750 184,450 - 1.370.800
1979 CUHREf\!T BUDGET ESTIMATES
PROGR:"M OPERATIO:llS & ~I'\ I :-JTr::-J'\~CE - COXSERV"TIO:\ "REAS P:.G:: __ _12.
r I 1979 BUDGET SOURCES OF FINANCING I( 1978 ACTU:\LS 1978 BUDGET ,
I
ACTIViTY !l EXPENDITURSS REVENl.:::S N::T PROVINCIAL MUN!C!PAL I OTHER \ I EX?END!TURES REVE:-:UES I EXP8J:m.;,,~ REV=~~~::S I
EX PEND ITURES GRANT LEVY I
, ! I ;
I
I Albion Hills 233,000 140.400 92,600 - 92,600 - 226.187 148.631 I 229.000 141.000
I_ Boyd 137,000 82,600 54.400 - 54.400 - 120,833 89.969 I 125,000 87.500
I Bruce's ~Iill 161,000 114,100 46.900 - 46,900 - 133,983 104,380 139,000 I 102.000
I Claremont 50,000 11 , 000 39.000 - 39,000 - I 43,991 15.271 I 47,OlJO 13,000
Claireville 51.800 51,800 I I i
179.000 127.200 - - 198.807 132,307 198,500 I 132 ,000
Cold Creek 92.000 42,300 49,700 49.700 86.616 53.343 91,000 I 50,000 i
- - I
Glen lIaffy 84,500 26.700 57.800 57.800 68.690 25.151 I 71,000 25.000 I
- - I !
I Greenwood 103,000 22.400 80,600 - 80,600 - 82,409 26,746 \ 88,000 i 26.500 I
I I I
i Heart Lake 129.500 67.700, 61.800 - 61,800 - 96,458 68.410 102.000 i 67,500 I
\lIumber Trail s I I
9,000 1.500 7,500 - 7,500 - 6,957 1,760 I 5.500 1,700 I
7,800 7.800 33,520 I
I mIne - - - - 17.300 33,000 17,300 I
I Palgrave 9.000 9.000 - - - - 19,284 758 22,000 22,000 I
I Serv ice Area 17.000 - 17,000 - 17,000 - 13,533 ,- 18.000 - I
II~oodbridge 8.000 - 8.000 - 8,000 - 6,900 - 6,700 - i
! Petticoat Creek I
151,000 57.300 93.700 - 93.700 - 121.931 61.958 120.000 61.200 I
I Visitors Services - - - - - - 8.614 ,7.580 8.700 I 6.700 I
I I
! I
.- j
I I
\ I
I
( TOTAL )( 1.370.800 I 710.000 I 660.800 )( - I 660.800 I - )( 1,268.713 I 753,564 )( 1.304.400 I 753,400 )
1979 CURRENT BUDGET ESTIMATES
PROGRAM OPERATIONS & f1AINTENANCE - CO~~1UNITY_ RELATIONS - INFORMATION & EDUCATION OPERATIONS PAGE 13.
PURPOSE: To provide an outdoor and conservation education programme for school students and other community
groups at four Conservation Field Centres and a variety of outdoor and conservation education
opportunities for the general public and school groups at the Kortright Centre for Conservation
and at the Black Creek Pioneer Village.
1979 OBJECTIVES: _ a continuation of the programme at the same level of service as in 1978 for existing facilities
_ the opening of the Kortright Centre Building for public use
_ to provide an outdoor and conservation education programme for the following estimated number of
students and adults:
_ Black Creek Pioneer village 64.000
_ Conservation Field Centres l5,500
. Albion Hills Conservation Farm '9,000
- Maple Syrup Days 3l,000
_ Special Days, Field Trips, Claireville
Dam Tours etc...... 12,000
_ Kortright Centre for Conservation 50.000
FUNDING: Programme revenues and the General Levy on all participating municipalities. A surplus or deficit
on the operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited
to the participating boards of education. A grant of $l8,000. from the Provincial Ministry of
culture and Recreation is estimated for the operation of the Kortright Centre for Conservation.
FINANCIAL COMMENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures.
The net cost to the municipalities is estimated at $73.300. a decrease of $30,090 over 1978
budget.
OBJECTIVE CLASSIFICATIONS:
,Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents ~ Expenses Total
"
$ $ $' $ $ $ $ $
460.000 140.500 38.300 - 213.000 - - 85l.,800
1979 CURRENT BUDGET ESTIMATES
PRCGRAM OPERATIO:l1S Ii ~L\I:\TENM:C:E - Cml~llJ:l11TY RELATIONS - INFOR~L\TION & EDUCATION OPERATIONS PAGE 14. -
! 1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS 1978 RUDGET )
I R::VENUES I
I ACTIVITY EXFENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXFENDITU:.ES
EXPENDITURES GRANT LEVY
I I I
I Albion Hills c.r.c. 147,500 147.500 - - - - 126.035 131.793 141.000 142.000 I
!.Bord C.F.C. 167.000 167.000 - - - - 165,597 165.597 155,000 155,000 I
Claremont C.F.C. 151.500 151.500 - - - - 146.151 146.099 141.000 142.000
Cold Creek C.F.C. 36,500 36.500 - - - - 38 .671 37.134 34.000 35,000
Lake St. George C.F.C. 68.500 68.500 - - - - - - - -
,
: I s Farm ) 18,201 8.414 30.100 27.000
I
Albion Hills Operations ) INCLUDED I GENERAL INTI RPRETIVE PROG M 656 - 3,400 3.800
Bruce's ~Ii 11 ) 2,515 2.515 I 3.00~ 3.000
General Interpretive Prog. 10.500 10,500 - -, - - - - - -
B.C.P.V. Pioneer Life 31.000 21,000 10.000 - 10.000 - 37.835 23.870 43,000 21.700
I B:C. P .,v. Tours 72 , 300 41,000 31,300 - 31.300 - 70.770 31.814 74.000 25,000
Kortright 167.000 112.000 55,000 18.000 32.000 5.000 93,711 25,826 85.000 37,000
!Farm Conversion - - - - - - 63,894 54.007 - - I
-
I
j I
I
( TarAL )( 851.800 I 755.500 I 96.300 )( 18.000 I 73.300 I 5.000 )( 764.036 I 627.069 )( 709.500 I 591,500 )
1979 CURRENT. ,BUDGET ESTIMATES
PROGRAM Operations & Maintenance - Black Creek Pioneer Village Operations PAGE 1~.
PURPOSE: To provide a living portrayal of a crossroads village in. Pre-confederation Ontario.
'1979 -OBJECTIVES: - to continue the effective operation of this heritage conservation, project within financial
constraints . ' ,
_ to accommodate 300,000 visitors in 1979 ,'.' . . ,
_ to maintain the Village's heritage structures within financial constraints ..
FUNDING: Program revenues, Provincial museum grant ($72,000). The Metropolitan Toronto and Region
Conservat~on Foundation Endowment Fund ($10,000) and the General Levy on all participating
municipalities ($72,000).
FINANCIAL COMMENTS: This budget is 4.1% over the 1978 budget and will require considerable restraint in all
expenditures.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services 'Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
591.000 249.700' 15.300 - 29.400 3.600 - 889.000
1979 CUR~Ef"T BUDGET EST!rJlATES
PROGRAM OPERATIOXS & ~~I~TEN~~CE - BLACK CREEK PIONEER \ILLAGE OPE~\TIO~S p,,"'c Hi.
I ",\)_
, 1f EXFEND:TURSS 1979 BUDGET SOURCES OF FINANCING ) 1978 ACTUALS I( 1978 BUDGET )
I ).CTIVITY NET PROVINCIAL MUNICiPAL I 1\ EXPE!'m!Tl;,,~ R::V::~~::S
REVENUES EX PEND ITU"ES GRANT LEVY OTHER EXFENDITUR::S REVENUES
I
Registrar's Operations 23.750 - 23.750 - 23.75Q - 32,003 - 36.500 -
Gatc House 14.250 - 14.250 - 14.250 - 12,080 - 13.000 -
Admiil i strat ion 174,500 - 174.500 - 174.500 - 159,707 - 142.500 -
I Building Staff etc... 285.750 - 285.750 72 . 000 213.750 - 272.353 - 267.000 -
I Gift Shop Operations 174.750 - 174.750 - 174.750 - 177,988 - '175.000 -
I Security 18.500 - 18.500 - 18.500 - 16.435 - 18.000 I - I
-I
j Livcstock Operations 51,500 - 51.500 - 51.500 - 54,094 - 49.000 I -
I
! ~ainte~ance - Bui~dings 69.750 - 69.750 - 69.750 - 53,136 - 53.000
~mintenance - Grounds 51.500 - 51.500 - 5'1.500 - 56.492 - 57.000 I -
Workshop Opcrations - - - - - - 20,357 - 12.000 -
Winter Program 6.250 - 6.250 - 6.250 - 5,299 - I 5.000 -
I
I Special Events 13 . 000 - 13.000 - 13.000 - 9.070 - 14.000 -
, I~edding Program 5.500 - 5.500 - 5.500 - 6.558 - 4.500 -
I Peacock 1100ds I - - - - - - 2.238 - 7.500 -
I '
I Adr.lission Receipts I
- 405.000 (405.000) - (405.000) - 434,322 i 400,000 I
I i
: Endowmcnt Fund Interest - 10.000 (10.000) - (10.000) - (170) I 6.000
I Food Services I - 40.000 (40.000) - (40.000) - 38.595 I 30.000
I Photography - 4,000 (4.000) - (4.000) - 3.678 4.000
Sales Outlets - 275.000 (275.000) - (275.000) 276.977 260.000 I
-
I Wcddings - 14.000 (14.000) - (14.000) - 10.815 7.000
I Rentals & mscellaneous - 2.000 (2.000) - (2.000) - 9.079 3.000
J
\.
( TOTAL )( 889.000 I 750.000 I 139.00~ )( 72 . 000 I 67.000 I - )( 877.810 I 773.296 )f 854.000 I 710.000 )
..
1979 CURRENT BUDGET ESTIMATES
PR9GRAM Water & Related Land Management - Op~rations & Maintenance of Water Control Stru~tures (W5) PAGE 17.
PURPOSE: To maintain Flood Control works established under the Authority's Plart for Flood Control and Water
Conservation.
19]9.,DBJ~CTlVES: _ continuation of the regular maintenan,ce of Flood Control wO'rks .,:a"t.':a"'~level comparable with that
of 1978 . ' ..,:,; "'~'.' '
_ major maintenance to be carried out at 11ilne, Black Creek'." Low~i" 'Hu~bei:'. Mass~y Creek and
Claireville
_ provision for the maintenance of erosion control channels constructed under the downstream
erosion control program
FUNDING: This is a shared program. 55% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: Funding has been allocated in order to cover a progressive mainten~ce program. including non-
recurring major maintenance.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $. $ $ $
67.30'0 55.800 - - 60.900 - - 184.000
1979 CURREN-r BUDGET ESTlr.nATES
PROGRAM I~ATER & RELATED LA~D ~t~:'l:\GE~IENT ..:. OPERATIO~S & ~IAINTENANCE :..' I~^TF.R CONTROL STRUCTURES (I~5) P~G~ 18.
f 1 EXFENDiTURES 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS If 1S78 BUDGET
ACTIVITY NET PROVINCIAL MUNICIPAL II EX;:~D:TI.:!'\E:S R~VE~:~ES
REVENUES EXPENDITURES , GRANT LEVY OTHER EXPENDITURES REVENUES
Flood Warning System 18.000 - 18.000 , 9.900 8.100 - 12.488 - I 12.000 -
Claireville Dam 23.000 - 23.UOO 12.650 10.350 - 26.871 - 23.000 -
Milne Dam 4.000 - 4;000 2.200 1.800 - 5.054 - 6.000 - I
G. Ross Lord Dam I 23.000 - 23,000 12.650' 10.350 - 19.868 - 23.000 -
I Small Dams General 3.000 ' - 3.000 1.650 1.350 - 1.818 - , 4.000 -
!
I Flood Control Channel' 75.0.00 - 75.000 41.250 33.7!!0 - 75.225 - 69.000 -
Erosion Control 4.000 - 4.000 2.200 1.800 - 1.462 - 2.000 -
~~jor ~~intenance 34.000 - 34.000 18.700 15.300 - 17.953 - 20.000 I - ,I
I I
. , I
I
- I
I
I '"
I J
I
I
l ..
( TOTAL )( 184.000 I - I 184.000 )( 101.200 I 82.800 I - )[ 160.739 I - )( 159.000 I - )
1979 CURRENT BUDGET ESTIMATES
WATER & RELATED LAND MANAGEMENT - CO~~1UNITY RELATIONS (SUPPORT) (WiO) 19,
PROGRAM PAGE
PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information,
community and staff relations and outdoor and conservation programme.
1979 OBJECTIVES: _ to provide information, publications, tours and official openings.of projects, photographic
coverage, movie prints of existing films and exhibits relating to water and land man~gement
aspects of the Authority programme
FUNDING: This is a shared programme -- 55% of the funds being available from The Province of Ontario
and the balance being funded from the General Levy and participating municipalities.
OBJECTIVE CLASSIFICATIONS:
Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
210.235 28.765 - - - - - 239.000
1979 CURRENT BUDGET ESTIMATES
PROGRAM ''lATER & RELATF.D LA.'lD ~I:\N'\GF.MF.NT - CO~U.RJNITY RELATIONS (SlIPPORT) (WIO) P""GE 20.
r 1 EXPENOIT~RES 1979 BUDGET SOUrlCES OF FINANCING . l( 1978 ACTUALS 1978 hUXET
I ACTIVITY NET PROVINCIAL MUN!CIPAL 'I EXPENDITURES EXPENDITWF.::S I REV!;N:JES
REVENUES EX?ENDITURES GRANT LEVY OTHER REVE:-:UES I
CO~SERVATION INFORMATION I
Staff Salaries 57.735 - 57.735 31.755. 25.980 - 50.853 - '51.990 -
Staff Travel & Expenses 2.000 ., 2.000 1.100 900 - 2.132 - 2.000 -
-
Publications & Printing 12.500 - 12.500 6.875 5.625 - 20.281 - 20.500 -
Tours & Special Days 4.015 ' - 4.015 2.208 1.807 - 1.167 - 3.000 -
Photographic Supplies 3.250 - 3.250 1.787 . 1.463 - 3.685 - 3.000 - i
Motion Picture Program 4.000 - 4.000 2.200 1.800 - - - 4.000 -
I
. Exhibits 1.000 - 1.000 550 450 - 8.348 - 1.000 - 'I
.
Promotional Contingency. 1.000 - 1.000 ,550 450 - - - 1.000 - .1
I GONSERVATION EDUCATION
I Staff Salaries 53.500 - 53.500 29.425 24.075 - 49.134 - I 50.225 ..
Staff Travel & Expenses 1.000 - 1.000 550 450 - 1.066 - 1.000 -
I
99.000 54 ;450 I
Education Supervisors - 99.000 44.550 - 98.334 - I 92.235 - I
I
Part Time Staff - - - - - - 3.108 - 3,050 - I
I
I-=- I I
I I
I .
. .
( TOTAL ]( 239.000 I - I 239.000 )( 131.450 I 107.550 I - )( 238.108 I - )( 233.000 I - )
,
1979 CURRENT BUDGET ESTIMATES
PROGRAM Water and Related Land Management - Cocrnunity Relations (Development) (WlO) PAGE' ,21.
PURPOSE: To develop the facilities required for the Authority's Outdoor and Conservation Education'Pr~grarns.
. .
191~ OBJECTIVES: - the development of trails, outdoor ..exhibits and demonstr.atiQns ~t th.e' Boyd, conservati,Q~,'E'd~c:~.t"ton
Complex '.' { - , . ." ,',;":-:'. . ........'.. ,', :
- completion of the construction, initial furnishings. equipment and exhibits for the'Kortr'ight . .',
Centre for Conservation
- to carry out the construction and development of the Lake St. George Conservation Field Centre
FUNDING: For the development of the Kortright Centre for Conservation. 55% of the funding is from the
Province of Ontario, the balance from the General Levy.
For the Exhibit Program. the $216.472 is dependant on funds from The Metropolitan Toronto and
Region Conservation Foundation and from Wintario.
$12,000 for the improvement of the Albion Hills Conservation Field Centre will be funded from
special revenue.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
175.425 200.000 - - 100.769 - - 476.l94
1979 CURR.ENT BUDGET ESTIMATES
PROGRAM WATER & RELATED LAND ~~~AGEMENT ~ C~~NITY RELATIONS (DEVELOPMENT) ,(WlOY. PAGE 22.
1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS I( 1978 BUIiGET
ACTIVITY EXPE,"JOITURES REVENUES NET PROVINCIAL MUMCIPAL OTHER EXPENDITURES REV Er-:UES EXF~D1TURES REV~N:.lES
EXPENDITURES GRANT LEVY
I
Boyd Education Complex - - - - - - 94.786 - 98.000 -
, Kortright 292.472 - 292.472 41.800. 34.200 216.472 . 171.085 - 190.000 -
Albion Hills C.F.C. 12.000 - 12.000 - - 12.000 - - - -
Farm Interpretive Program - - - - - - - - - -
Bard F.C. - - - - ..; - - - - -
Workshop Craft Building - - - - - - - - - -
I Claremont F.C. - - -' - - - - - - -
: Cold Creek F.C. - - - - - - - - -, -
I Glo..co 'ark - - - - - - - ' - - -
. L~ke St. George 171.722 - 171.722 - - ,171.722 718 - - -
I
I
I
I
r
( TOTAL )( 476.194 I - I 476.194 )( 41.800 I 3~.200 I 400.194 )( 266.649 I - )( 288.000 I - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Water & Related Land Mana~ement - Taxes. Insurance etc... (Wll ) PAGE 23.
PURPOSE: To provide for costs associated with taxes on non-revenue producing areas an~ l~ability insurance
on Authority lands under Water and Related Land Management Programs. _
. .
FUNDING': This is a shared program. 55% of the funds being available ,fr~m,the.P.rovinc~ '~f':~tario and the
,balance being funded from the General Levy on all participat;inlr'~~,~"pali~ies"" .
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
.. - - - 9.000 189.000 - 198.000
1979 CURRENT BUDGET ESTIMATES
PROGRAM I'IATER & RELATED LAND MA!-lAGE~IENT - TAXES AND INSll~ANCE (IH1) PAGE 24.
1979 BUDGET SOURCES OF FINANCING - ( 1978 ACTUALS , 1978 BUDGET
ACTIVITY EXPE."IIDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER- EXPENDITURES REVENUES EXPENO!TUR::5 REV::~~~::S
EXPENDITURES GRANT LEVY
-Taxes, non-revenue 189.000 - 189.000 103.950 85,050, - 190.073 - 175.000 -
Insurance ~.OOO - 9.000 4.950 4.050 - 9.268 - 9.000 -
I
;
,\
.
, ,
i ,
I ,"
-'
( TOTAL )( 198.000 I - I 198.000 )( 108.900 I 89;100 I - )( 199.341 I - )( 184.000 I - )
1979 CURRENT .BUPGET :.ESTIMATES.. .,
,. - 25.
. PROGRAM WATER Ii RELATED ",AND ~tA.~AGEMENT - INTERIM PROJECT SU~fllIARY' - CURRENT, Ii CAPITAL . , P"GE
r 1979 BUDGET SOUfl"CeS Of FINANCING ' 1.978 ACTUALS 1978 2Ul:IGET - "1
j ACTIVITY , EXPE.'IlOITURES REVENUES NET PROVIN;i-AL ' MUN1C,leAL ' OTHER €XPE.~Dl'rURES 'REVENUES I EXP~~!TUR:S I ~~'{EN~ES
f EXPENDITURE~ GRAN LE Y
I .
CURRENT ' .
W.C. Projects 92,500 - - 92.500 50,875 41,.625 - .. 84",4J2 - 83.000 -
-
-~eg~ladons 182.500 - 182.500 100.375 !l2,125 - i56,599 - 154.000 -
ConserVation Services 178,000 . 15.000 163~OOO 89.650 73,350 - 77,259 - 76.000 ' 15,000
..
CAPITAL ,.
All Benefiting . - 1.369.273 - 1.369,273 753.100 616.173 - . - - 2,602.770 -
.. Benefiting Municipalities 1..776,690 27,000 1.749.690 957.3~5 792.345 - 1.007.021 22.469 972.000 15,000 ' I
I. .. -
I
,
I
. .
I r
]
I
l
( TarAL )( 3.598,963 I 42,000 I 3,556,963 )( 1,951,345 11,605.618 1 - )( I 22.469 )( 3.887.770 I 30.000 )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Water & Related Land Management - Interim Project Current (W2) (W3) (W7) (W8) PAGE 26.
PURPOSE: To provide the funding required for carrying out the objectives of the Interim Water and Related
Land Management Project under current budget category and which apply to all municipalities
benefiting as well as single benefiting municipalities.
1979. OBJECTIVES: _ to continue the program of the installat~on of a radio system in co-operation with the. Ministry
of Natural Resources for transmitting flood control and flood warning information.
_ the installation of three Telemark stream gauges in the continuing program of stream gauge
telemetry
_ the administration and enforcement of water management regulations. and sub-division reviews.
including salaries of enforcement officers and sub-division review staff. travel. legal and
technical support costs
_ to carry out resource management practices on Authority lands and to provide Conservation
Assistance Programs for private landowners
FUNDING: This is a shared program. 55% of the funds being available from the Province of Ontario. and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: Salaries are based on 1978 levels.
'OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wa~es Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
250.900 65.800 23.000 - 113,300 - - 453.000
-
.
,
1979 CURRENT BUDGET ESTIMATES
PROGRAM . WATER & RELATED LAND ~IANAGE~IE~'T - INTERnl PROJECT CURRENT - WATER COi\'TROL PROJECTS (112) P,.\i3E 27.
1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 197"8 BUDGET
ACTIVITY EXPENDITURES REVENUES NET. PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITUR::.5 R::VE!'-:~::S
EXPENDITURES GRANT LEVY
Staff Salaries 65.800 - 65.800 36.190 29.610 - 45.742 - 45.345 -
Staff Travel 3.700 - ~.700 2.035 1.665 - 1.386 - 2.655 .,.
Flood Control Structures - - - - - - 9.859 - 7,500 -
Safety Stations - .. - - - - . - ISO - .- '. -
Milne Study - - - - - - 1.500 - 4.500 -
IFlood Warning System
jRadiO 15,000 - 15.000 8.250 6.750 - 17.502 - 15,000 -
!Te1emarks 8,000 - 8.000 4,400 3.600 - 7.365 - 6.,000 -
Flood Control Centre - - - - - - 968 . - 2,000 . -
I
!
( ToTAL )( 9~.500 I - I 92.500 )( 50.875 I 4~,625 I - )( 84.472 I - )( 83.000 I - )
1979 CURRENT BUDGET ESTIMt'JES
PROGRAM 11t\TER & RELATED Lt\~D ~IANAGE~IENT - INTERIM PRO.JECT CURRENT - 11ATER ~IANAGE~IENT REGULATIONS (117) P:'G:: 28,
1979 BUDGET SOURCES OF FINANCING ' 1978 ACTUALS 1978 BUDGET I
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXPENDITURES REVa.:U::S
EXPENDITURES GRANT LEVY
Staff Salaries 104.800 - 104.800 57.640 47.16B - 84.049 - I 77,845 - I
Staff Travel. and Expenses 4.000 - 4.000 2.200 1.800 - 3.725 - 4.950 -
Enforcement Officers Sal. 48.900 - 48.900 26.895 22.005 - 43.790 - 43.790 - I
I Enforcement Officerl! Veh. 11.500 - 11.500 6.32.5 5,175 - 13.365 - 11.500 -
. .legal Fees 8.300 - 8.300 4.565 3.735 - 4.912 - 10.415 - I
I Technical Plans and ~~ps 5.000 - 5.000 2.750 2.250 - 6.758 - 5.500 - ,I
I
i I
1
I
1
I
I
( TOTAL )( 182.500 I - I 182.500 )( 100.375 I 82.125 I - )( 156.599 I - )( 154.000 I - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM I~ATER & RELATED LA.f<lD ~L-\NAGHtE~T - INTERnt PROJECT CURRENT - CONS. SERVICES & RIVERBANK EROSION (I'i3) (I~8) P~G:: 29.
1979 BUDGET SOURCES OF FINANCING I 1978 ACTUALS 19i5 BUDGET 1
:'CTI'IITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXFENO!TURES I R::VE~~~ES
EXPENDITURES GRANT LEVY
Staff Salaries 31.400 - 31.400 17,270 14.130. - 14.850 - 14.850 -
Staff Travel 2.000 - ~.OOO 1,100 900 - 1.078 - 1.750 -
I
Private Lands
Reforestation 12.000 . 2.000 10,000 5.500 4.500 - 9.964 2,090 10.000 3,000
Stream Improvement 28.000 2,500 25.500 14.025 11.475 - 30,189 2.304 28.000 2.000
Reforestation Subsidies 1.000 - 1,000 550 450 - 303 - 1,000 -
Farm Tree & Shrub 20,000 10.000 10.000 5.5PO 4,500 - 16.247 8.974 15,POO 9.000
Land Use Planning 6,000 500 5,500 3,025 2.475 - 4.62"8 215 5.400 1.000
Iprogram Study & Inf~rmation 7,600 - 7.600 4.180 3.420 - - - - -
.Conservation Assistance - - - . - - - - - - -
Conservation Lands
fl'" PtOp..,,'nn 5,000 - 5.000 2.750 2.250 - - - - -
Woodlot ~bnagement 45.000 - 45.000 24.750 20,250 - - - - - i
~iidlife Improvement 15.000 - 15.000 8.250 6,750 - - - - - 1
ILand Management Study I 5,000 - 5.000 2.750 2,250 - - - - -
I I
i o.
I
I
( TOTAL )( 178.000 I 15.000 I 163,000 )( 89.650 I 73.350 I - J[ 77.259 I 13,583 )( 76.000 I 15.000 )
1979 CAPITAL BUDGET ESTIMATES
PROGRAM Water and Related Land Management - Interim Project Capital pAGE 30.
PURPOSE: To provide the funding required for carrying out the objectives of the Interim Water and Related
Land Management Project under capital budget category and which apply to all municipalities bene-
fiting as well as single benefiting municipalities.
1979 OBJECTIVES: - to continue the review of the Authority's Flood Control Plan from both hydrologic and environ-
mental aspects
- to continue vallyland acquisition as well as important headwater lands
- to fi~ish engineering studies on the Wilket Creek and Oak Ridges
- the continuation of Downstream Erosion Control in Metropolitan Toronto. Peel, York and Durham
- the completion of the reconstruction of Highland Creek channels
- first phase of construction of the Stouffville Flood Control Channel
FUNDING: A 50% grant is available for pre-1978 projects and a 55% grant for post-1978.projects from the
Province of Ontario and the balance being funded from the Capital Levy on participating
municipalities.
The approval of the completion of Project WC-58 on the Don River is being considered by the
Province of Ontario; Metropolitan Toronto has approved its portion of the funding. The budget
revision to include WC-58 will be made when the decision of the Province is known.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $, $ $ $ $
510.000 468.00.0 - 842.273 1.325.690 - - 3.145.963
1979 CAPITAL BUDGET ESTI:\'~ATES
PROGRAM I1ATER & RELATED LAND MANAGE~fENT - INTERnl PROJECT CAPITAL - ALL BENEFITING PAGE 31.
r , 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS (
I 1978 BUDGET
ACTIVITY NET PROVINCIAL MUN!CIPAL
I I EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EX?END1TUR~ REVE:\~::S .
.
I Plan Review 397.000 "_. 397.000 218.350 178.650 - 29.585 - 60.000 -
I ~nvironmental ~fonitoring 100.000 - 100.000 55.000 45.000 - 155.072 - 150.000 -
I Flood Plain Acquisition 642.273 - 642.273 353,250 289,023 - 2.249~828 - 2.063,770 -
Headwaters Acquisition 200,000 - 200,000 ,110.000 90.000 - - - - - I
I Reforestation 10.000 - 10,000 5.500 4.500 - - - - -
I
.Stream Improvements 20.000 - 20.000 "11..000 ,9.000 - - - - - I
Mapping - - - - - - 135.813 - 104.000 -
I Erosion Inventory - - - - - - 12.599 - 10.000 - I
I HYdrol~gic "Iodel ' .
- ~ - -. ' - - 188.992 - 215.000 - I
G. Ross Lord Dam - - - - - - , . - - -
Public Relations - - - - - - 868 ' - - -
.
( TOTAL )( 1.369.273 I - I 1.369.273)( 753.1001 616,1731 - )( 2,772,7571 - )( 2,602,770 1 - )
1979 CAPITAL BUDGET ESTIMATES
?ROGRAM I~ATER & RELATED LA,,{D MA~AGEMEf\'T - INTERIM PROJECT CAPITAL - BENEFITING ~RJ~ICIPALITIES ?AGE 32.
1979 BUDGET SOURC:S OF FINANCING 1978 ACTUALS 1978 BUDGET
;'CTIVITY EXFE.I\:OITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPE.~OITURES REVENUES .
EXPENO!TURES GRANT LEVY EX?E.~OITU~ RE:V~~~~;:S .
Erosion Control
~Ietro 825.000 25.000 800.000 440.000 360.000 - 5S9.822 ' 22.469 505.000 15.000
Peel. 101.000 1.000 100.000 55.000 45.000 - :- - - -
York 75.500 500 75.000 41.250 33.7S0 - - - - - I
Durham 25.500 500 25.000 13.750 11.250 - - - - - I
Highland Creek (M) 240.000 240.000 ' 132.000 108.000 408.759 400.000 I
- - - -
'Stouffvi11e (Y) 395.000 - 395.000 217.250 177.750 - 10.234 - 20.000 -
I~ilket Creek (M) 10.000 - 10.000 5,590 4,500 - - - 12,000 -
Oak Ridges. (Y) 5.000 :- 5,000 2.750 2.250 - 11.600 - 10.000 -
Sherway Drive - - - - - - . - - 10.000 -
WC-58 - Don River 99.690 - 99.690 49,845 49.845 - 15,035 ' - 15.000 -
Methane Gas Study - - - - - - 1,571 - - -
I
I
I ..
I
i
( TOTAL )( 1,776.690 I 27.000 I 1.749,690)( 957,345 I 792.3451 - )( 1,007.0211 22.469)( 972.000 I 15.000)
1979 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Conservation Areas (Support) (Cl) PAGE 33.
PURPOSE: To administer and develop Authority owned conservation lands in keeping with the conservation
and recreation land management plan.
To provide a comprehensive program of management and provision of outdoor recreation opportun-
ities through facility improvements and master planning of conservation areas.
1979 OBJECTIVES: _ to complete the Conservation and Recreation Land Management component of the Watershed Plan
_ to develop and schedule the Master Plan of Conservation Areas
_ to administer existing programs and activities
FUNDING: This is a shared program. 50% of the funds being available from,the Province of Ontario and" the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: The adjustment for 1979 identifies the realignment of existing staff salaries.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wa~es Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
133.760 - - - 9.740 - - 143.500
"
1979 CURRENT BUDGET ESTIMATES,' , ": < ':"
- -. " . -
PROG~A'''; 'CONSERVATION Ii' RECREATION LAND MAN^GE~IENT - CONSERVATION AREAS (SUPPORT) (Cl) . ., " . PAGE 34.
r ... l - -.- ,.,. BUDGET SOURCES OF FINANCING "7. ACTIlALS ,.,UUl!GET
. , . O\C.T.IVITY, -". '. " 'EXPEN~RES . REVENUES EXPEJt,i-fURES PR~~~~+AL MUN~~~~L ,OTHER EXPENDITUREs , REVENV.E~'"' ~~END~;URS' "R~VEN:.lES
Staff Salaries" 11~7'160 '. ' 127.260 63.630 63.630.. 105.372 I. 104.500 .
~taff T,ravel Ii fxpe~ses. ' 3.240 . . - ~.240 1.620 1.620 ,. 2'.0~7' ..'. ' It. ': ',' 3,.000'1' ' -
Vehicles' '. ',.6.~OO. '. 6.500 3.250 3.250. 6.239 , ' =1.000., -
Pond Service " . .6~500. '. 6.500 3.250 3.250. 12.547 -,.. . 1"2,0'00 .':"
I ' ' , . " .
, . '
. , ,I
". ' . I
I I
. i
.
.
[ TOTAL )( 143.500 I . I 143.500 )( 71.750 I 71.750 I . )( 126.235 I . )( 126.500 I . )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Conservation Areas (Development) (Cl) PAGE 35.
-,-
PURPOSE: To develop facilities on conservation lands in accordance with the intended five year develop-
ment plan (1974-1978) and in keeping with the Ministry of Natural Resources direction not to
impede the Uaster Pl,anning process.
1979 OBJECTIVES: To develop facilities to permit increased, attendance and enhance user experiences and reduce
operational costs.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: Provincial and Municipal funding limitations for this program have necessitated the revision
and extension of the five year Conservation Area Development Plan.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents, Taxes Expenses Total
$ $ $ $ $ $ $ $
23.l00 42.650 5.900 - 54.850 - - 126.500
:
,
" "
. .
1979 CURRENT BUDGET ESTIMATES
PROGRAM CO~SERVATION & RECREATION LAND MAN^GE~IENT - CONSERVATION AREAS (OEVELOP~IENT) (C1) P~"I" 36.
-"'-
1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS If 19;B rsUO:iET
ACTIVITY EXPEND:TURES REVEr-.:UES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REV Er-.:UES II EXPEl'~D!TU~::S I REVE~~'JES
EXPENDITURES GRANT LEVY
Albion Hills 43.600 - 43.600 21.800 21. 80Q' . - 17.37'1 - 14.375 -
Black Creek 1.000 - 1.000 500 500 - 4.949 - 4.985 -
Boyd - - - - - - 16.155 - 16.750 -
Bruce I s ~Iill 12,500 - 12.500 6.250 6.250 - 15.864 - 13.545 -
C1airevi11e - - - - - - 73.627 - ' 75,415 -
Claremont - . - - - - - 6,201 - 6.020 -
Cold Creek 29.000 - 29.000 14.500 14.500 - 18.641 - 18,710 - I
Glen Haffy 8.500 - 8.500 4.250 4.250 - 18,914 - 19.520 - 'I
Greenwood, 3.200 - 3,200 1.600 1.600 - 4,947 - 4.970 - I
Heart Lake 7.000 - 7.000 3.500 3,500 - 16.648 - 16.705 -
Oak Ridges - - :.. - - - 3.724 - 3.240 -
Petticoat Creek 8.000 - 8.000 4.000 4,000 - 15,121 - 14.515 -
Glen ~Iajor - - - - - - 2,541 - 2.160 -
I
Lake St. George I
- - - - - - 2,555 - 2,590 - I
I
I Studies etc... 7.500 - 7.500 3.750 3.750 - - - - -
General Development 6.200 - 6.200 3.100 3,100 - - - - -
I Milne - - - - - - - - - -
I
! I
l I
( TOTAL )( 126.500 I - I 126,500 )( 63.250 I 63.250 I - )( 217.264 I - )( 213.500 I - )
-
1979 CAPITAL BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Cons. & Niagara Escarpment Land (C2) PAGE 37.
-
.PURPQSE: To acquire Conservation Area an4 Niagara Escarpment Lands ~~ set,ou~ 'in the Authority's plan
for ancillary conservation measures and Niagara Escarpment La~d .acqui~ition~..:The purpose of
,. such acquisitions is to bring into public ownership envi~o~eh.ta~lY':important l~n~s such as
, . source areas. headwater zone river valleys and Oak Ridge's; ~~rJ.o}i<I~,te'.'lI!oraine~lands.
., . . " . . Z;~:~"'~:"'.;''''::'~'''.'.~' .' ~'~';~:"~~~cT~-;'''.'
-. ,,'
. ~ '. .
1979 OBJECTIVES: There is no provision in the 1979 Budget Estimates to acquire any land under.this program.
FUNDING: This is a shared program, a 50% grant on Niagara Escarpment Lands and Conservation Lands is
available from the Province of Ontario. the balance being funded from the General Levy on all
participating municipalities or funds which may be made available through The Metropolitan
Toronto and Region Conservation Foundation or through funds raised through Authority revenues.
FINANC IAL COMMENTS: Funding priorities preclude the allocation of grant aided funds to enable acquisitions under'
this program in 1979.
.- ."
., -
: ., . .
, ' . . ....
. ' . .. ,-
-.
1~19.. CURRENT.. BUDGET .ESTIMATES .-
.-
. 38~ :. ..
. . . . . . .
PROGRI.M CONSERVATION. 6 RECREA~ION LAND t.IA."AC9IENT -. 'CONSERVATION fi. NIAGARA .ESCARP~IENT LAND eC2) ~AGE. ..
r 1:979: BUDGET 'SOURCES OF. FINANCING ~97S ACTUALS 1978 BUDGET
ACTIVITY ,-EXPENOITURES REVENUES' NET, PRg~~tAL ~UNlC~!e~L OTHER EXPENDITURES REVENUES .1 EXPa!OliUi\S- RE:VEN~E:S : .
EXPENDITURES lE
.. '.
Niagara Escarpment Land . - - - - - - 18.801 - . 18.800 . -
, eonservat ion Area Land ..
- - - - - - 430.911 - 430.915 -
. . '.
" .. -
I
i ' .
I :
I
I
, '
I I
I
I
( TOTAL )( - I - I - )( - I - I - )( 449,712 I - )( 449.715 I - )
.. 1979 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Conservation Area Information & Interpretive Program (C3) PAGE 39.
PURPOSE: To provide information and interpretive programs related to recreation and land management in the
Authority's 14 conservation areas.
1979 OBJECTIVES: To continue the programs carried out in 1978.
FUNDING: This is a shared program. 50% of the funds being available from the Province o( Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: Limited funding from the Province of Ontario and member municipalities required some programs to
be transferred to operations an~ maintenance for funding.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wa~es Utilities Equipment .Pr.operty & Rents Taxes Exp~nses Total
----
$ $ $ $ $ $ $ $
n.800 3.525 - - 5.675 - - 21.000
,-
;
.,
. ,
, . . . ... ;
~ -
. .
... ' ..
"
.,.
.
-
"
~
, . ;.
... .
, .. . - ,
1979 CURRE~~T BUDGET ESTIMATES
PROGRAM CONSERVATION Ii RECREATION L^,~D M^NAGE~IENT - CONSERVATION AREA INFOR~IATION Ii INTERPRETIVE (n) PAGE 40. -
r 1 EXPENDITURES 1979 BUDGET SOURCES OF FINANCING 1978.:\CTUA~S 1978 BUDGET
.\CTIVITY REVENUES NET' PROVINCIAL MUN!CIPAL OTHER EXPENDITURES REV E~UES EXPENClTURES R=:VE~~ES
I EXPENDITURES GRANT LEVY
Staff Sa1!lries 11.100 - 11.100 5.550 5 . 550" - '. 10.470 - 10.470 -
Publications & Printing 3.000 - ~.OOO 1,500 1.500 - 3.200 - 3.530 -
Tours & Special Days 2,000 - 2.000 1,000 1.000 - 1.511 - 2.000 -
Photographic Supplies 2.900 - 2.900 1.450 1.450 - 3.822 - 3.000 -
~wtion Picture Program 2.000 - 2.000 1.000 1.000 - 2.293 - 2.000 -
I
! I
i
I
I
I
I
I
I I
!
( TOTAL )( 21,000 I - I 21.000 )( 10.500 I 10,500 I - )( 21,296 I - )( 21,000 I - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Rent & Utility Services (C5) PAGE 41.
PURPOSE: Provision of administration of the Central Services and Stores.
1979 OBJECTIVES: _ the provision of stock supplies, including purchasing and distribution
_ the provision of building and mechanical trades service to all Divisions of the Authority
as required
FUNDING: This is a shared program, 50% of the funds being available from~the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents ~ Expenses Total
$ $ $ $ $ $ $ $
35.930 - - - 3,070 - - 39.000
1979 CURRENT BUDGET ESTIMATES -
..
~ROGRAM CONSERVATION Ii RECREATIO:.l LAND ~IANAGEMENT - REfo.'T Ii UTILITY SERVICES (C5) p' ~~ ' il2.'. .
."'\J_
r 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS .." . . 19;8 BUDGET ' .
I ACTIVITY NET PROVINCIAL MUN~C1PAL REVENuES '. EXPENCIT~R::S : REvt:-:UES
EXPENDiTURES REVENUES EXPENDITURES GRANT EVY OTHER . EXPENDITURES
, '
Staff Salaries. . '35.930 35,930 17.965 17.965. 34,052 ' . ' .
- - - 34.000 , ,
.Vehicles 3.070 - ~.070 1.535 1,535 - 2..451 - . 4.000 ' .
-
,.
, . ' ..
:
'.. '. o.
I .
( TOTAL )( 39,000 I - I 39,000 )( 19,500 I 19,500 I - )( 36.503 I - )( 38.000 I - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land Management - Taxes, Insurance etc... (C6) PAGE 43.
PURPOSE: To provide for costs associated with taxes on non-revenue producing areas and liability insurance
on Authority lands and facilities under Conservation & Recreation Land Management programs.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy ~n all participating municipalities.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& WaJ!;es Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
- . - - - 10.000 60.000 - 70.000
--
1979 CURRENT BUDGET ESTIMATES
PROGRAM CONSERVATION Ii REr;REATION LAND MANAGEPIENT - TAXES AND INSURANCE (C6) P~GE 44.
r ( 1979 BUDGET SOURCES OF FINANCING " 1978 ACTUALS 1978 BUDGET ,1
ACTIVITY I NET PROVINCIAL MUNICIP~L - I EXF~D!TU"::S I R::V::~:~::S
EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXFENDITURES REVENUES
. i
I
Taxes. non-revenue 60.000 - 60.000 30,000 30.006 - 58,797 - 58.000 -
Insurance 10,000 - 10.000 5.000 5.000 - 9.381 - 9,000 -
I
I I
I
I
I
( TOTAL )( 70.000 I - I 70,000 )( 35.000 '" 35.000 I - )( 68,178 I - )( 67.000 I - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM Water & Related Land Management - Waterfront Programs (W9) P:'GE 45.
PURPOSE: To provide administrative. planning and engineering staff necessary for implementing the
Waterfront Project.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy Qn all participating municipalities.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents ~ Expenses Total
$ $ $ $ $ . $ $ $
62.000 - - - 4.000 - - 66.000
1979 CURRENT BUDGET ESTIMATES,
PROGRAM WATER & RELATED ~ND ~IANAGE~IENT - WATERFRONT PROGRMIS (1~9) PAGE lj6.
1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 1978 BUDGET
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUN!C!PAL OTHER EXPENDITURES REVENUES EXPE.\:DlTURES REVE~UES
EXPENDITURES GRANT LEVY
Staff Salaries 62.000 - 62.000 31.000 31.000, - '. I 55.878 - 56.525 -
'Travel & Expenses 4.000 - 4.000 2.000 2.000 - 3.011 - 3.475 -
I . .
I
I
I '
I
i I
I
I
I
( TOTAL )( 66.000 I - I 66.000 )( 33.000 I 33.000 I - )( 58.889 I - )( 60.000 I - )
1979 CAPITAL BUDGET ESTIMATES
PROGRAM Special Projects - Waterfront Plan PAGE 47.
PURPOSE: The purpose of the Waterfront Plan is to create, on the Lake Ontario Shoreline within the area
of the Authority's jurisdiction, a handsome waterfront balanced in its land uses which will
complement adjacent areas, taking cognizance of existing residential development and making
available, wherever possible, features which warrant public use.
1979 OBJECTIVES: - the completion of the landfilling operation at Humber Bay West Phase II in preparation for
surface development in 1980
- the continuation of the landfill project at Bluffer's Phase II and construction of launching
and parking facilities
- the continuation of development at Humber Bay East in preparation for completion in 1980
- the completion of preliminary 'design for future work along the Western Beaches
- the continuation of the environmental monitoring program
- the continuation of acquisition of endangered homes and construction of priority works relating
to shoreline management
- the continuation of the regular acquisition program
- the completion of the Master Plan review for East Point Park
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the Waterfront Capital Levy on all participating municipalities. The
Government of Canada ~as participated in the construction of shore protection at the Small Craft
Harbour at Bluffer's Park. It is anticipated that the Federal Assistance will continue in 1979.
FINANCIAL COMMENTS: 1979 is the third year of the second five year project for Waterfront Development and the estimates
are based on anticipated cash flow from the Province of Ontario.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
50.000 - - 320.000 2.430.000 - - 2.800.000
1979 CAPITAL BUDGET ESTIMATES
PROGRAM SPECIAL PROJECTS ,- I~ATERr:RONT PLAN PAGE 48,
r 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 1978 BUDGET
ACTIVITY EXPENDrrUR~ REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEII:UES I EXFE.~DITI,;,,~ REVE:-:-..::;S
EXPENDITURES GRANT LEVY
. Humber Bay West 160.000 "- 160.000 80.000 80,000 - 398,632 - 305.578 -
I H~mber Bay East 950.000 - 950,000 475.000 475.000 - 381.305 - 373.000 -
I
, Western Beaches 5.000 - 5.000 2.500 2.500 - 42)698 - 50.000 -
Ashbridgc's Bay 5.000 - 5.000 2.500 2.500 - 67,683 - 70.000 -
Bluffer's - I & II 740.000 - 740.000 370,000 370.000 - 374.230 - 352.000 -
I East Point Park 20.000 - 20.000 '10. 000 10.000 - 46.255 - 69.000 -
i Environmental Studies 60.000 - 60.000 ~O.OOO 30.000 - 96.880 - 100.000 -
and ~Ionitoring
Shoreline Management 450.000 - 450,000 225.000 225.000 - 167,637 - 175.000 -
Staff Salaries 50.000 - 50,000 25,000 25,000 - ~6,304 - 80.000 -
Land Acquisition 240.000 - 240.000 120,000 120.000 - 9.751,919 - 9,759,000 -
~l3pping - - - - - - 539 - 1.000 -
Col. S. B. Smith 50.000 - 50,000 25,000 25.000 - 86.881 - 90.000 -
Petticoat Creek 20.000 - 20.000 10 ,000 10.000 - ,16,030 - 15,000 -
~laintcnance 50.000 - 50.000 ~5,000 25,000 - - - - -
-
!
i
I
( TarAL )( 2.800,000 I - I 2.800.000)( 1.400,000 1 1.400.0001 - )( 11.486.9931 - )( 11.439.5781 - )
1979 CURRENT BUDGET ESTIMATES
PROGRAM 'Historic Sites Development PAGE. 49.
-
PURPOSE: To carry out restoration and development work at the Black Creek Pioneer Village and other
Authority historical sites in accordance with approved plans.
1979 OBJECTIVES: _ to carry out minor improvements to the buildings and landscaping at Black Creek Pioneer
Village
_ to complete the restoration of the Taylor Cooperage
_ to continue the restoration of the Sawyer's Home
_ to continue the restoration of the Richmond Hill Manse
FUNDING: The Metropolitan Toronto and Region Conservation Foundation and Wintario.
FINANCIAL COMMENTS: Work will proceed on these projects as funds become available from The Metropolitan Toronto and
Region Conservation Foundation.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents ~ Expenses Total
$ $ $ $ $ $ $ $
10.000 10.000 - - 40.000 - - 60.000
1979 CURRENT BUDGET EST!MATES
?ROGRAM IlISTORIC SITES DEVELOP~IEt\'T P~E '50.
r ... Hi79 BUDGET SOlJRCES OF FINANCING 1978 ACTUALS 1973 BUDGET ,
I ACTIVITY I' EXPE.'.lDITU.RES REVENUES . NE.T PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURSs.\ REVEX.JES '.'
I EXPENDITURES GRANT LEVY
IROblin'S Mill 1.000 - 1.000 - - 1.000 - - 1.000 - ' .
..
I Boa 1"lh~a1 k 1.000 - ~.OOO - - 1.000 , 2.453 - 1.000 - '.
IBrucc'S Mill ..
- - 3.000 .' - ~. . . .~ .
- - - - - - .... .-"
'". .
Carriage liorks - - - - - , - - - "...::;.:<::,F..
Doctor I 5 House - - - - - - 23.568 - 20.000 - . .
~Iennonite Meeting Hall - - - - - - 8 - - - I
ITaYlor Cooperage 30.000 - 30.000 - - 30.000 185 - 30.000 - -1
Sawycr's Housc 12.000 - 12.000 - - 12.000 - - 12..000 -
IRichrnond Hill ~~nse 10.000 - 10.000 - - 10.000 13.671 - 11.000 -
la.copovo Visitors Centre - - - - - - 10.897 - - -
ICollection 6.000 - 6.000 - - 6.000 775 - 6.000 -
I
I
I
I
I
J -
( TOTAL )( 60.000 I - I 60.000 )( - I - I 60.000 )( 51.557 I - )( 84 . 000 I - )
B-16
SCHEDULE "B"
In accordance with Rule #6 - Rules for the Conduct of the Authority -
Resolution #88/75, as amended, the following are biographies of persons
recommended for appointment to functional advisory boards.
HISTORICAL SITES
Bradshaw, John. - member of Historical Sites Advisory Board
since 1974
- garden commentator on C.F.R.B. for more than
29 years
- garden editor for several newspapers
- honoured for his horticultural knowledge and
writings
- active supporter of the Authority and Black
Creek Pioneer Village
- frequently publicizes activities of the
Authority and Black Creek Pioneer Village on
radio
- Honorary Reeve of Black Creek Pioneer Village
for the years 1976 and 1977.
Russell, Dr. Loris - member of the Technical Advisory Committee and
Historical Sites Advisory Board since 1964
- specialist in palaeontology - 40 years
researching prehistoric life in western North
America
- retired from position of Chief Biologist, Royal
Ontario Museum, in 1971 with title 'Curator
Emeritus' and is Professor Emeritus of the
University of Toronto
- began collecting historical material for
Canadian Centenary while serving as Director of
the National Museum of Canada
- research led to several noteworthy publications
- detailed book on history of lighting in the
19th century and an account of 19th century
crafts and industries.
Scott, Dr. John - member of the Historical Sites Advisory Board
since 1957
- Director of Electroencephalographic Department
at Toronto General Hospital for almost 30 years
- Professor of Physiology at University of
Toronto
- Chairman of Toronto Historical Board and
Chairman of the Museum Committee for the Academy
of Medicine
- member of the Medical Historical Club of Toronto
- member of the Ontario Historical Society
- member of the York Pioneer and Historical
Society
- member of the Canadian Society for the History
of Medicine
- awarded the Medal of Service by the City of
Toronto in 1975.
McGinnis, Brig.-Gen. John - member of the Technical Advisory Committee and
Historical Sites Advisory Board since 1963
- appointed Director for the newly restored
Fort York by Toronto Civic Historical Committee
in 1952
- presently Managing-Director with the Toronto
Historical Board
- actively involved with numerous military
associations - the Architectural Conservancy
of Ontario, Heritage Canada, Canadian Museum
Association, the Company of Military Historians,
the John Graves Simcoe Memorial Foundation, the
American Association for State and Local
-2-
McGinnis, Brig.-Gen. John A. - continued
History, the Institute of Public Administration
of Canada, the Toronto-Amsterdam Twin City
Committee, and the Convention and Tourist
Bureau of Metropolitan Toronto.
Davidson, William C., Q.C. - member of the Humber Valley Conservation
Authority from 1950 to 1956
- involved \.,ith The Netropolitan Toronto and
Region Conservation Authority since 1957
- Vice-Chairman and a member of The Metropolitan
Toronto and Region Conservation Foundation from
1959 to 1966
- member of the Historical Sites Advisory Board
since 1970.
Neil, Mrs. Elsa - member of the Technical Advisory Committee and
the Historical Sites Advisory Board since 1963
- prior to 1963, played a major role as consultant
to the Humber Valley Conservation Authority in
the design and construction of exhibits at the .
Dalziel Museum
- created the original concept of Black Creek
Pioneer Village and worked on its inception.
Langdon, John E. - member of the Historical Sites Advisory Board
since 1973
- member of The Metropolitan Toronto and Region
Conservation Foundation since 1976
- for several years, member of the Board of
Trustees for the Royal Ontario Museum and also
Vice-Chairman
- Director of the Friends of Winterthur for six
years
- member of the American Antiquarian Society
- corresponding member of the Colonial Society of
Massachusetts and a Fellow of the Royal Society
of Arts
- was a member and Past President of the Ontario
Heritage Foundation
- member of the Silver Society of London, England
- his knowledge and research in the field of
silver has resulted in the publishing of four
major books.
McMeans, Mrs. Christine - appointed to the Historical Sites Advisory Board
in 1977
- active member of the Junior League of Toronto
since 1966
- Chairman of the Junior League's Arts and
Education Committee and she prepared the
presentation which resulted in a donation of up
to $8,000 for the restoration of the Sawyer's
Home at Black Creek pioneer Village
Higgins, Harvey - presently First Vice-President of the Weston
Lions Club
- has served terms on both the Weston Board of
Education and the York Board of Education
- an employee of 23 years with Ontario Hydro
- educational background includes a degree in
Engineering Technology
- outstanding record of dedicated public service
on other committees of the Borough of York and
as an active conservationist, would make an
excellent contribution towards achieving the
objectives of the Authority
INFORMATION & EDUCATION
Downing, John - political columnist for Toronto Sun
- has worked for Toronto newspapers since 1958
- lives in Etobicoke with his wife and three sons
- has taken a number of environmental science
.-.nnrc:.Ac:. .=a+- nn;\T~"'C::;+-" nr 'f1nrnni-n
- 3 -
Downing, John - Continued - is a journalism graduate of Ryerson Poly tech-
nical Institute
- was an appointee to the Information and
Education Advisory Board in 1977 and 1978
- 1I0nourary Reeve of Dlack Creek Pioneer Village
for the years 1978 and 1979
Nelligan. B.E. - educated in Hamilton, Ontario, both elementary
and secondary
- attended College of Education, University of
Toronto and obtained his D.A. in 1945 and his
M.Ed. in 1960
- teaching experience: -
- Director of Guidance for Hamilton Separate
School System
- Master of Peterborough Teachers' College
- Inspector of Separate Schools in the
Peterborough area
- presently is the Director of Education for the
Metropolitan Separate School Board
- married with nine children and presently living
in Toronto
- member of the Albion Hills Conservation School
Management Advisory Committee in 1967 and 1968
- member of the Conservation Education Advisory
Committee from 1969 to 1972
- appointee of the Information and Education
Advisory Board 1973 to 1978
- presented with Colonel Watson Award by the
Ontario Association for Curriculum Development
in 1978.
Brown, C.G. - B.A. degree in honours geography from University
of Toronto in 1951
- graduate from Ontario College of Education in
1952
- specialist's certificate in geQgraphy
- Secondary School's Principal's Certificate
- Teaching Experience:
- 1952-54 teacher at Bathurst Heights
Secondary School in North York
- 1954-55 on a leave of absence and was
teaching in South America
- 1956-59 head of Geography Department,
Downsview Secondary School in North York
- 1959-61 Assistant to Superintendent of .
Secondary Schools for North York Board of
Education
- 1961-63 Principal of Emery Collegiate
Institute, North York
- 1963-67 Principal of Earl Haig Secondary
School, North York
- 1967-69 Area Supervisor in North York
- 1969-72 Superintendent of Program and
Instruction
- 1972-74, Assistant Director of Education,
North York
- 1974-Present - Director of the Metropolitan
Toronto School Board
- married with three children and presently living
in Toronto
,- appointee to Information and Education Advisory
Board from 1975 to 1978
Dunlop, W. John - appointee to Information and Education Advisory
Board since 1971
- was Director of Public Service - Canadian
Broadcasting Corporation
- Education - Jarvis Collegiate Institute'
- University of Toronto
- married with two children
- active service in R.C.N.V.R.
- presently National Chairman of Public Relations
Canadian Red Cross Society, Canadian Cancer
Society, Salvation Army
- 11 -
Dunlop. \-1. John - Continued - lIlernlJer of fund-raising committees for disaster
appeals, latest being the Indian Cyclone Relief
'Fund of which he was Chairman
- mmnber of the Vadican Council II
- on three occasions he has been the International
Broadcasting Official for Her Majesty the Queen
- life honourary member of the International Red
Cross
- Order of Distinguished Auxiliary Service for the
Salvation Army
- has gold cross from the Greek Red Cross
- Chairman of several film festivals in Bulgaria,
Puerto Rico and Monte Carlo
" - former editor of I Saturday Night'
" - has Queen Elizabeth's Silver Jubilee Medal
,
~: .~,. - member of Badminton & Raquet Club of Toronto and
", . . the Canadian Club of New York
.' - presently living in Mississauga.
James, Robert L. - Professor of Sociology at Scarborough College,
University of Toronto
- formerly at University of Alberta, Montana State
University, University of Nevada, obtained Ph.D.
at University of Oregon
- Research Consultant - Alberta Home and School
Association
- Research Association - Edmonton Council of
Community Services
- Educational Consultant - Ministry of Education
(Family Life Studies)
- teaching interests - family
- current research, vocational versus marriage and
family choices among senior public and secondary
students on Ministry of Education grant
- presently a resident of Scarborough, Canadian
citizen
- was hn appointee to the Information and Education
Advisory Board in 1977 and 1978
WATERFRONT
Pickett, P.B. , Q.C. - educated at the North Toronto Collegiate
Institute
University of Toronto, night school (B.A.)
Graduate of Osgoode Hall Law School
- home owner and life-long resident of Toronto,
- former Executive Member of Bedford Park Home
Owners Association
- Paul and his wife Barbara have two children
- Lawyer - called June, 1955 and in private
practice at III Richmond Street West
- Alderman, Toronto City Council; elected 1964,
re-elected 1972
- member of Metropolitan Council 1964-l972 (inc1. )
- member of Executive Committee of Toronto and
Metropolitan Toronto Council 1970-l972 (inclusive)
- member of The Metropolitan Toronto and Region
Conservation Authority 1971-l977 (inclusive)
- Honourary Member and Council of Royal Canadian
Legion Branch 344 (Queen's Own Rifles of Canada)
- member of the Waterfront Advisory Board of The
Metropolitan Toronto and Region Conservation
Authority 1971-1978 (inclusive)
- member of Board of Trade of Metropolitan Toronto
- member 0: Board of North Toronto Memorial Arena
- member of Metropolitan Licensing Commission,
Vice-Chairman.
Norton, G.F.R. - Canadian Citizen
- married with three children
- served with R.C.N.V.R. 1943-1945 (inclusive)
- graduated University of Toronto, Civil Engineering
1952
- represented Canada in Sailing in Olympics of 1960,
1968, 1972
- 5 -
Norton, G.F.R. - Continued - past Commodore of RCYC
- past Vice-Chairman of Sail Ontario
- Manager of Speci.al Projects, Department of
Mollenhauer Limited
- member of APEO and Engineering Institute of
Canada
- Director of Board of Toronto Brigantine
Incorporated
- Waterfront Advisory Board, appointee 1974-1978
(inclusive)
CONSERVATION LAND MANAGEMENT
Bell , R.E. - born at Gilford - Simcoe County
- educated at Bradford High School and O.A.C.
Guelph - graduated in Agronomy in 1949
- joined Ontario Ministry of Agriculture, Extension
Branch in 1949
- 1949-l952 - Assistant - peterborough
- 1952-l960 - Woodstock - Oxford as Agricultural
Representative
- 1960-l963 - Associate Director of Extension
O.M.A.F. , Queen's Park
- 1963-l970 - Ottawa as Area Co-Ordinator and Farm
Management Specialist for l4 Eastern Counties
- 1970 to present - Ag. Rep. in Peel at Brampton
- member of Ontario Institute of Agrologists
- served on Reforestation and Land Use Advisory
Board 1970-l977 inclusive
- served on Conservation Land Management Advisory
Board in 1978
- has served on Conservation Farm Sub-Committee
1973-l978 inclusive
Gardhouse, George - born - Toronto Gore Township and raised
Chinguacousy Township
- farmed at present location since 1950
- Past President - Peel County Soil and Crop
Improvement Association
- Past President - Peel County Junior Farmers
- served 14 years as provincial Director, Ontario
Soil and Crop Improvement A~sociation
- Past President - Ontario Soil and Crop Improve-
ment Association
- nine years as a member of Chinguacousy Township
Counc il
- two years Deputy-Reeve", Chinguacousy Township
- served on Peel Committee Services Board
- associated fifteen years with The Metropolitan
Toronto and Region Conservation Authority as
Authority and Advisory Board member
- assisted Authority by permitting Streambank
Erosion Control Pilot Project to be undertaken
on property.
McDermott, Neil C. - graduated from University of New Brunswick with
a Bachelor of Science degree in Forestry in 1954
- 1954-l965 - worked with Defence Construction
Limited at Camp Gagetown, N.B. , Canadian National
Railways and about one year with the Santa Fe
Railway in Los Angeles
- work in the above included such activities at
timber salvaging, surveying and construction
- since 1965, employed by the Department of Lands
and Forests (now the Ministry of Nat~ral
Resources) - last lO years as a Management
Forester in the Maple District
- since 1976, represented the Maple District on
The Metropolitan and Region Conservation
Authority Forestry Committee and also served on
the Forestry Technical Review Committee for the
Kortright Centre.
- 6 -
Bryson, Jesse A. _ resident and farmer in Town of Vaughan
- served as Public School Trustee, four years as
Councillor and four years as Deputy-Reeve in
Township of vaughan
_ past Chairman of York County Planning and
Agricultural Committee and Board of Health
_ president of Vaughan Township lIistorical Society
in 1973 and 1974
_ received Honourary Membership in S.C.S.A. in
1962 and was President of Ontario Chapter
_ involved with Junior Farmers Association and the
Soil and Crop Improvement Association
_ member of the Authority from 1957-l978 inclusive
_ served on Humber Valley Advisory Board from 1957-
1978 inclusive
_ served on Reforestation and Land Use Advisory
Board from 1957 - 1971
_ member of Personnel Sub-Committee 1972 - 1975
_ Chairman of Personnel Sub-Committee 1976 - 1978
_ Chairman of Historical Sites Advisory Board
from 1972 - 1978
_ Chairman of the Achievement Recognition Committee
1974
_ member of the Achievement Recognition Committee
1975 - 1978
Lemon, Eugene _ took over family farm in 1932
_ twenty years in dairy business then cash cropping
_ reforested three acres in 1933
_ planted windbreaks a few years later
- in the early 1950's, in co-operation with the
Soils Department, University of Guelph, a land
use plan, including soil and water conservation,
was drawn up. The plan provided for strip
cropping, a pond and 80,000 tile. This plan was
carried out over several years
_ pas~ President of Stouffville Co-Operative
Association
_ past President of York County Crop Improvement
Association
_ Past President of the Ontario Soil & Crop
Improvement Association
_ Past Chairman of the Ontario Safety Council
_ Honourary member of the Soil Conservation Society
of America
_ representing Ontario Soil & Crop Improvement
Association on Ontario Conservation Council for
10 years
_ church secretary and secondary school class
teacher for number of years
_ served as an appointee on Reforestation and Land
Use Advisory Board of The Metropolitan Toronto
and Region Conservation Authority since 1957
_ since 1960, has been recording precipitation for
The Metropolitan Toronto and Region Conservation
Authority Flood warning Control
Lister, Mrs. Lois _ appointee of the Conservation Areas Advisory
Board since 1957
~ - landscape architect
~( _ member of Canadian Society of Landscape Architects
.( _ associate member of American society of Landscape
I
I Architects
- M.A. Cambridge University, England (economics)
_ post-graduate Fellowship at Radcliffe College,
Cambridge, Massachusetts (Harvard - Radcliffe
Management Training Course)
- has lived in Toronto since 1949
- five children
_ member, Board of Directors of the Linnaean
Society of Canada
_ delegate for the Canadian Society of Landscape
Architects to the First European Conference on
the Environment at V.N.E.S.C.O., Paris, December,
1977
- 7 -
FLOOD CONTROL & \~ATER CONSERVATION
Martin, L. , P.El1g. - married with two children
- owner of CASE - Computer Applications and
Systems Engineering
- specializing in computer applications to earth
sciences since 1961
- educated at the North Toronto Collegiate
Institute - Senior Matriculation
University of Toronto (B.A. Sc. Engineering
Physics) and H.A. (GEophysics)
- member of Association of Professional Engineers,
Ontario
- member of Canadian Institute of ~tining and
Metallurgy
- member of Society of Exploration Geophysicists
(world-wide)
- member of Soil Conservation Society of America
- Chairman, Hetro Toronto Community Tennis Council
- Executive, Etobicoke Sports Council
- Executive and Chairman of Parks and Recreation
Committee for Etobicoke Federation of Residents
and Ratepayers Associations
- member, Toronto Field Naturalists' Club
- memb er , Flood Control and Water Conservation
Advisory Board, 1977 and 1978
- member of Exploration Geochemists (world-wide)
Swann, Wm. - born in Coleman, Alta. in 19l3
- educated in Marquis, Sask.
- completed civil engineering course at Universi~y
of Saskatoon in 1933
- 1946 appointed Civil Engineer with Township of
Etobicoke
- became Deputy Engineer and then Chief Engineer
of ~orough of Etobicoke in early 1950's
- past president of the Municipal Engineers'
Association
- past president and Director of the Canadian
Institute of Pollution Control
- member of the Association of Professional
Engineers of Ontario, Federation of Environmental
Organization, American Water Works Association,
Roads and Transportation Association of Canada
and served as a member of the Ontario Municipal
Engineers' Advisory Committee to the Minister of
Highways.
1979.02.l4.
IKC.
~ B-17
,
the metropolitan toronto and region conservation authority
minutes REPORT #2/79
:~ECUTIVE COMMITTEE WEDNESDAY-MARCH-7-1979 #2/79
The Executive Committee met in the Board Room, Authority Office, 5 Shore ham
Drive, Downsview, on Wednesday, March 7, 1979, commencing at 10:00 a.m.
PRESENT FOR TilE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Ge1l
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
H.G. Westney
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & Policy Mrs. A.C. Deans
Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau
Project Engineer-Development, Flood Control A.G. Sahabandu
Section. Water Resource Division
HEARING:
Following the Roll Call, the Meeting recessed to hold a Hearing re:
Kingspoint Developments Limited
City of Brampton
Etobicoke Creek Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hanc~y
C.F. Kline
E.V. folb
Dr. T.H. Leith
J.S. Scott
H.G. Westney
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
8-18 -2-
PRESENT FOR THE MEETING (Contd.)
Executive Secretary Mrs. K. Conron
Research Planner, Planning & policy Mrs. A.C. Deans
Senior Administrative Secretary Mrs. M. Mitchell
Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau
Supervisor, Property Administration, P&A Divn. D.J. Prince
ABSENT WAS
Member Mrs. S. Martin
MINUTES
The Minutes of Meeting #1/79 were presented.
Res. 123 Moved by: M.W.H. Biggar
Seconded by: H.G. Westney
RESOLVED THAT: The Minutes of Meeting #l/79, as presented, be adopted as if
read. CARRIED:
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
1. EXECUTIVE COMMITTEE MEETING
MAY 30, 19 79 : GUILD INN
Res. #24 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The meeting of the Executive Committee scheduled for
Wednesday, May 30, 1979, be held at the Guild Inn, commencing at
10:00 a.m., followed by luncheon and a tour of the Guild Inn property.
CARRIED,
2. DISPOSAL OF TOXIC WASTES
A staff communication was presented having regard to the following
resolution adopted by the Executive Committee at Meeting 120/78, held
December 20, 1978:
"Res. #53l Moved by: M.J. Breen
Seconded by: Mrs. S. Martin
RESOLVED THAT: The recommendation having regard to the disposal
of toxic wastes in Ontario, as amended and contained herein, be
approved:
WHEREAS the disposal of toxic wastes in the Province of Ontario
and in the Metropolitan Toronto region is a matter of critical
importance:
AND WHEREAS the indiscriminate discharge of these wastes to
watercourses is dangerous and highly undesirable,
THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region
Conservation Autho~ity request the Government of the Province of
Ontario and the Ministry of the Environment to immedi~tely .
establish safe and controlled disposal sites for toxic wastes in
the Province of Ontario. ,CARRIED: "
-3- B-19
Further to the foregoing resolution, a letter under date of February 7,
1979, and report entitled "A Seven-Point Program for the Disposal of Liquid
Industrial Waste", were received from The Honourable H.C. Parrott, D.D.S.,
Ontario Minister of the Environment, advising that "toxic wastes" hav~ the
highest priority in the Ministry and that solutions are being actively
sought to the very complex problem associated with their safe handling and
disposal.
Res. #25 Moved by: C.F. Kline
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication concerning the disposal of toxic
wastes, together with the correspondence and report entitled "A Seven-
Point Program for the Disposal of Liquid Industrial Waste", received from
The Honourable H.C. Parrott, D.D.S., Ontario Minister of the Environment,
be received. CARRIED;
3. BILLS 80 AND 195; ACTS TO
AMEND THE MUNICIPAL ACT
A staff communication was presented, advising that the Authority is in
receipt of correspondence dated February 22, 1979, from the Essex Region
Conservation Authority having regard to Bills 80 and 195; Acts to Amend
the Municipal Act.
Res. #26 Moved by: E.V. Kolb
Seconded by: M.J. Breen
RESOLVED THAT: The staff report, together with correspondence from the
Essex Region Conservation Authority under date of February 22, 1979, be
received; and
THAT due to the confusion and apparent doubt created by amendments to The
Municipal Act in the enactment of Bills 80 and 195, the Minister of
Natural Resources and the Minister of Intergovernmental Affairs be urged
to consider and clarify as soon as possible the intent concerning the pay-
ment of per diem, mileage, salaries, expenses, benefits, etc. to members of
a conservation authority appointed by its participating municipalities, so
that budget estimates for 1980 may be adjusted accordingly. CARRIED;
4. QUOTATION #79-02
-One 1979 4-000rSedan, with Trade
A staff communication was presented advising that the following quotations
have been received (from the 27 invitations) for the supply and delivery
of one new 1979 4-door Sedan with trade:.
Hawman Plymouth Chrysler Ltd. $ 4,655.65
Eric Matson Motors $ 4,939.79
Pine-Mercury $ 5,014.10
Little Brothers $ 5,296.58
Wilson Niblett Chev. Olds $ 5,874.38
The above prices include all taxes and licence.
Res. 127 Moved by: C.F. Kline
Seconded by: M.J. Breen
RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the
supply and delivery of one 1979 4-door Sedan, with trade, in the sum of
$4,655.65, including all taxes and licence, be accepted; it being the
lowest quotation received. CARRIED;
5. QUOTATION #79-03
-One 1979 Station Wagon, with Trade
A staff communication was presented advising that the following quotations
have been received (from the 27 invitations) for the supply and delivery
of one new 1979 Station Wagon, with trade:
Hawman Plymouth Chrysler Limited $ 5,251.64
Eric Matson Motors $ 6,026.98
Pine Tree Mercury $ 6,105.50
Little Brothers $ 6,154.72
Wilson Niblett Motors $ 7,560.70
The above prices include all taxes and licence.
B-20 -4-
Res. .28 Moved by: C.F. Kline
Secon.ded by: M.J. Breen
RESOLVED THA'r: The quotation received from Eric Matson Motors Limited
for the supply and delivery of one new 1979 Station Wagon, with trade,
in the sum of $6,026.98., including all taxes and licence, be accepted;
it being the lowest proper quotation received.
CARRIED;
6. QUOTATION #79-04
-One 1979 I-ton Cab & Chassis, with Platform,
with trade
A staff communication was presented advising that the following quotations
have been received (from the 27 invitations) for the supply and delivery
of one new 1979 I-ton Cab and Chassis, complete with Platform, with trade:
Hawman Plymouth Chrysler Limited $ 7,791.44
Little Brothers $ 8,620.85
O.M.S. Truck Centre $ 8,707.52
Eric Matson Motors Limited $ 8,829.55
pine Tree Mercury $ 9,222.19
McCombe ( In t. ) Trucks Limited $12,344.26
The above prices include all taxes and licence.
Res. '29 Moved by: C.F. Kline
Seconded by: M.J. Breen
RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the
supply and delivery of one 1979 I-ton Cab and Chassis, with platform, with
trade, in the sum of $7,791.44, including all taxes and licence, be
accepted; it being the lowest quotation received. CARRIED;
7. QUOTATION #79-05
-Four 1979 I-ton Cab & Chassis, with Platform,
Trucks, with trades
A staff communication was presented advising that the following quotations
have been received (from the 27 invitations) for the supply and delivery
of four new 1979 I-ton Cab & Chassis, with Platform, Trucks, with trades:
Hawman plymouth Chrysler Limited $31,726.87
Eric Matson Motors Limited $32,089.47
Pine Tree Mercury $32,377.64
Little Brothers $32,600.20
O.M.S. Truck Centre $34,830.00
McCombe (Int. ) Trucks Limited $42,270.80
The above prices include all taxes and licences
Res. #30 Moved by: C.F. Kline
Seconded by: M.J. Breen
RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the
supply and delivery of four 1979 Cab and Chassis and Platform I-ton Trucks,
with trades, in the sum of $31,726.87, including all taxes and licences,
be accepted; it being the lowest quotation received. CARRIED;
8. QUOTATION 179-06
-One 1979 1/2-Ton Pick-Up Truck, with trade
A staff communication was presented advising that the following quotations
have been received (from the 27 invitations) for the supply and delivery
of one 1979 1/2-ton Pick-Up Truck, with trade:
Hawman Plymouth Chrysler Limited $ 4,040.18
Eric Matson Motors Limited $ 4,148.22
Little Brothers $ 4,214.59
Wilson Niblett Motors $ 4,825.78
O.M.S. Truck .Centre $ 5,123.02
pine Tree Mercury $ 5,189.36
McCombe (Int.) Truck s Limi ted $ 7,720.05
-5- B-2l
The aforementioned prices include all taxes and licence.
Res. '31 Moved by: C.F. Kline
Seconded by: M.J. Breen
RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for
the supply and delivery of one 1979 1/2-ton Pick-Up Truck, with trade, in
the sum of $4,040.18, including all taxes and licence, be accept~d; it
being the lowest quotation received.
CARRIED;
9. QUOTATION i79-07
-Rental of Vans and Trucks
A staff communication was presented advising that the following quotations
have been received for the rental of six 3/4-ton Pick-ups for use in the
Authority Tree Planting Programmes and other Conservation Services'
programmes:
Carman's Car Rentals Limited 2 at $395.00/month for 6 months -&-
4 at $440.00/month for 1 month;
1,200 free miles;
9C a mile (6C per km) over mileage
Tilden Rent-A-Car Company $370.00/month per unit;
1,200 free miles;
llC a mile over mileage;
Somerville Car & Truck 2 at $280.00/month for 6 mo~ths -&-
Rental Limi ted 4 at $295.00/month for 1 month;
1,200 free mil~s;
6C a mile over mileage;
Res. #32 Moved by: E.V. Kolb
Seconded by: M.J. Breen
RESOLVED THAT: The quotation of Somerville Car and Truck Rental Limited
for the rental of two Pick-Up Trucks at $280.00/month for six months, and
.' four PiCk-Up Trucks at $295.00/month for one month, plus l2C a mile over
1,200 mile/month, be accepted; it being the lowest quotation received.
CARRIED;
10. KORTRIGHT CENTRE FOR CONSERVATION
-Design of Entrance Area
A staff communication was presented advising that the InfoJ;mation & ~Cation
Division is developing a landscape plan for a 5-10 acre area, west of
.' pine Valley Drive, and for the entrance road to the Kortright Centre for
Conservation. In this connection, a proposal has been received from the
consulting firm of Johnson Sustronk Weinstein & Associates Limited for
preliminary design of the main entrance area to the Centre, in an amount
estimated to be $1,800.00 to $2,400.00.
Res. '33 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The proposal received from Johnson Sustronk Weinstein &
Associates Limited, dated February 16, 1979, for the design of the
entrance area'to the Kortright Centre for Conservation, in the approximate
amount of $1,800.00-$2,400.00, be received and approved; and
THAT the above-named firm be authorized to proceed with the work in accord-
ance with said proposal.
CARRIED;
11. CONVENTION & TOURIST BUREAU OF METROPOLITAN TORONTO
-Authority Participation in Co-operative Publication
"Superguide to Metropolitan Toronto"
A staff communication was presented advising that the Convention and
Tourist Bureau of Metropolitan Toronto is producing a four-colour
publication, entitled "Superguide to Metropolitan Toronto". This
publication will feature major hotels, shopping facilities, natural
attractions and major tourist attractions of Metropolitan Toronto. The
new publication replaces the co-operative "Attractions" brochure, in
B-22 -6-
which the Authority has participated for the past four years.
The cost of participating in "Superguide to Metropolitan Toronto" is
$6,300.00 for a half-p~ge colour panel; this is for a press run of
300,000 copies and an over-run of 300,000 of the 'Attractions I section
only. The Bureau has allowed the Authority a credit, for photographic
services, in the amount of $1,100.00, leaving a balance cost to the
Authority of $5,200.00.
Res. #34 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Authority participate in the production of 300,000
copies of the Convention & Tourist Bureau of Metropolitan Toronto
promotional publication, "Superguide to Metropolitan Toronto", and in
the over-run of 300,000 copies of the 'Attr~ctions I section, at a cost
of $5,200..00.
CARRIED;
12. DECISION OF HEARING
Kings Point Developments Limi ted
City of Brampton
Humber River Watershed
Res. #35 Moved by: Mrs. F. Gell
Seconded by: E.H. Card
BE IT RESOLVED THAT: This Executive confirm the decision of the Hearing
held this 7tn day of March, 1979; and
THAT the application of Kings Point Developments Limited, in accordance
with Ontario Regulation 735/73, for permission to place fill and construct
an institutional building (church) on Lot 7, Concession IE, City of
Brampton (Etobicoke Creek watershed), be refused on the following basis:
(a) This area is subject to flooding under a regional storm;
(b) This property has been defined as flood plain and
conservation land and, therefore, development will affect
the conservation of land.
CARRIED;
13. APPLICATION FOR PERMIT UNDER O.R. 735/73
Mr. Gino Flamino
TO construct a single-family dwelling on Part Lot
10, Concession 6, Town of Caledon (Bolton)
(Humber River Watershed)
A staff communication was presented advising that an application has been
received for a permit to construct a single-family dwelling on Glasgow
Road, Town of Bolton, on the east bank of the Humber River.
Res. #36 Moved by: M.J. Breen
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Mr. Gino Flamino, be received; and
THAT the application of Mr. Gino Flamino for a permit to construct a
single-family dwelling on Part of Lot 10, Concession 6, Town of Caledon
(Bolton), Humber River watershed, be approved, subject to:
(a) All work being completed to the satisfaction of the Authority
and of the Town of Caledon.
(b) The application complying with the existing by-laws and
regulations of the Town of Caledon.
(c) Every effort being made to minimize silting of the river
during construction.
CAR.~IED ;
-7- B-23
'14. APPLICATION FOR PERMIT UNDER O.R. 735/73
Mr. Jean Francis
To construct a 4' x 8' retention wall at 231 Rouge Hills
Drive, Borough of Scarborough (Rouge River Watershed)
A staff communication was presented advising that an application has been
received from Mr. Jean Francis for permission to construct a 4' x 8'
retention wall at the above-noted location.
Res. #37 Moved by: Mrs. F. Gell
Seconded by: J.S. Scott
RESOLVED THAT: The application of Mr. Jean Francis, together with the
staff communication, be received; and
THAT the application of Mr. Jean Francis for permission to construct a
4 ' x 8' retention wall on Lot 84, Plan 284, 231 Rouge Hills Drive,
Borough of Scarborough (Rouge River watershed), be approved, subject to:
(a) A gabion apron being placed under the proposed row of baskets
(shown in red on sketch);
(b) A layer of crushed stone or a filter mat being placed prior to
placing the gabion baskets;
(c) The pzoposed fill being clean and properly compacted and
covered;
(d) Every effort being made to minimize the silting of the channel
during construction.
CARRIED;
15. APPLICATION FOR PERMIT UNDER O.R. 735/73
Ontario Ministry of the Environment
To install a watermain along the valley of the
Little Etobicoke Creek from Burnhamthorpe Road
north to Eglinton Avenue, City of Mississauga
A staff communication was presented advising that an application has been
received for a permit to install a watermain along the valley of the
Little Etobicoke Creek at the above location.
Res. '38 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff communicat~on, together with the application of
the Ontario Ministry of the Environment, be received; and
THAT the application of the Ontario Ministry of the Environment for a
permit to install a watermain extending along the valley of the Little
Etobicoke Creek from Burnhamthorpe Road north to Eglinton Avenue in the
City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek
watershed, be approved, subject to:
(a) All chambers in the valley being equipped with watertight covers;
(b) All gabion works being preceded by a filter mat or a 6" - 12"
layer of crushed stone;
(c) Every effort being made to minimize the silting of the creek
during construction;
(d) Every effort being made to minimize the destruction of the
vegetation in the valley;
(e) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(f) A replanting scheme being undertaken after construction is complete;
(g) The creek being restored to its original configuration after the
crossings are compl~ted.
CARRIED;
B-24 -8-
16. APPLICATION FOR PERMIT UNDER O.R. 735/73
Mr. John A. Dick
TO install a culvert and place fill across
a watercourse (tributary of the Humber River),
TOwn of Caledon
A staff communication was presented advising that an application has been
received from Mr. John A. Dick to install a culvert and to place fill on
Part of Lot 38, Concession II, Town of Caledon.
Res. #39 Moved by: E.V. Kolb
Seconded by: M.J. Breen
RESOLVED THAT: The staff communication, together with the application of
Mr. John A. Dick, be received; and
THAT the application of Mr. John A. Dick for permission to install a
culvert and to place fill across a watercourse (a tributary of the Humber
River), on Part of Lot 38, Concession II, Town of Caledon (Humber River
watershed), be approved, subject to:
(a) The site plan being amended whereby the proposed driveway shall
be relocated westerly in order to accommodate the toe of the
newly-created side slope, which shall have a gradient of 3
horizontal to 1 vertical. The toe of the slope shall be at least
10 feet west of the easterly property line;
(b) A rip-rap splash apron being installed at the easterly end of the
culvert;
(c) The size of the proposed culvert being less than 48 inches;
(d) The silting of the watercourse being kept to a minimum during
construction;
(e) The newly-created side slopes being sodded and/or seeded;
(f) The owner being deemed responsible for the maintenance of the
culvert;
(g) The culvert allowing for the free flow of water downstream
(i.e., no obstructions to the flow of the water).
CARRIED;
17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DUF~N
CREEK WATERSHED
-Property: M. Petramala
Res. '40 Moved by: J.S. Scott
Seconded by: Mrs., F. Gell
RESOLVED THAT: The Report (February 21, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
liRe: Project: Interim Water and Related .Land Management Project
1979-1981 - Flood Plain and Valley Lan~ Acquisition
.. Component - Duffin Creek Watershed
! Authority: Executive Resolution No. 133, Meeting No.4 - April
12, 1978 and Authority Resolution No.51, Meeting
No.3 - April 21, 1978
: Subject
I Property: North side of Main Street (Stouffville)
I
I OWner: M. Petramala
Area to be Acquired: 0.033 acres, more or less
Recommended Purchase Price: $1,000.00, plus Vendor's legal costs
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being Part of Lot 5, Registered Plan 70, Town of
Whitchurch-Stouffville, The Regional Municipality of York, being a partial
taking from a larger commercial property fronting on the north side of
-9- B-25
Main Street in downtown Stouffville.
"Negotiati.ons have been conducted with the owner and his solicitor, Mr.
J.M. Armstrong, Q.C., of the legal firm Button, Armstrong & Ness,
6 Main Street East, Stouffville, LOH lLO and, subject to the approval of
your Committee, agreement has been reached with respect to a purchase
price as follows:
The purchase price is to be the sum of $1,000.00, plus Vendor's
legal costs, with date of completing the transaction to be as
soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements, are to be paid. The Authority is to
receive a conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
18. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DON
VALLEY WATERSHED
-Property: City of North York
Res. i4l Moved by: E.H. Card
Seconded by: H.G. Westney
RESOLVED THAT: The Report (February 19, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
liRe: Project: Interim Water and Related Land Management Project
1979-1981 - Flood Plain and valley Land Acquisition
Component - Don Valley Watershed
~uthority: Executive Resolution No.133, Meeting No.4 - April
12, 1978 and Authority Resolution No.5l - Meeting
No.3 - April 21, 1978
Subject
Property: South of Finch, East of Bayview Avenues
OWner: City of North York
Area to be Acquired: 2.411 acres, more or less
Recommended Purchase Price: Nominal consideration of $2.00,
plus legal and survey costs
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being Part of Lots 23, 24, 25, 26 and 27, Registered
Plan 2134, City of North York, The Municipality of Metropolitan Toronto,
having a frontage of approximately 253 feet on the east side of Bayview,
south of Finch Avenues.
II Negotiations have been conducted with officials of the City of North York
and, subject to the approval of your committee, agreement has been reached
with respect to a purchase price, as follows:
The purchase price is to be the nominal consideration of $2.00,
plus legal and survey costs, with date of completing the
transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements, are to be paid. The Authority is to
receive a conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate.
B-26 -10-
19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PL^IN AND VALLEY LAND ACQUISITION COMPONENT: HUMBER
VALLEY WATERSHED
-Property: Finery Investments Limited
Res. #42 Moved by: E.V. Kolb
Seconded by: J.S. Scott
RESOLVED THAT: The Report (February 20, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
liRe: Project: Interim Water and Related Land Management Project
1979-1981 - Flood Plain and Valley Land Acquisition
Component - Humber Valley Watershed
Authority: Executive Resolution No. 133, Meeting No. 4 - April
12, 1978 and Authority Resolution No.5l, Meeting
No.3 - April 21, 1978
Subject
Property: West side of Indian Line
OWner: Finery Investments Limited
Area to be Acquired: 10.800 acres, more or less
Recommended Purchase Price: Nominal consideration of $2.00,
plus Vendors' legal costs
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being All of Block "C", Registered Plan M-25l, City
of Mississauga, The Regional Municipality of Peel, ~ocated on the west side
of Indian Line, north of Darcel Avenue, immediately adjacent to the Indian
Line Campground.
II'Negotiations have been conducted with officials of Finery Investments
Limited and, subject to the approval of your committee, agreement has been
reached with respect to a purchase price, as follows:
The purchase price is to be the nominal considerat~on of $2.00,
plus Vendors' legal costs, with date of completing the
transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the transaction. All reasonable
expenses incurred incidental to the clo~ing, for land transfer tax, legal
costs and disbursements, are to be paid. The Authority is to receive a
conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
DAn application has been made to the Minister of Natural Resources for an
Inspection Certificate."
20. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DUFFIN
CREEK WATERSHED
-Property: W.J. Smith
Res. i43 Moved by: Mrs. J.A. Gardner
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Report (February 28, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the acquisition.
CARRIED;
liRe: project: Interim Water and Related Land Management Project
1979-1981 - Flood Plain and Valley Land Acquisition
Component- Duffin Creek Watershed
Authority: Executive Resolution No.133, Meeting No.4 - April
12, 1978, and Authority Resolution No.5l, Meeting
No.3 - April 21, 1978
Subject
Property: 22 Market Street
Owner: W.J. Smith
-11- B-27
Area to be Acquired: 0.207 acres, more or less
Recommended Settlement: $llO,OOO.OO, plus Vendor's legal
costs, being payment in full for
all claims
"Included ill the requirements for the above-noted project is a rectangular-
shaped parcel of land, being All of Lot 8, Registered Plan 972, Town of
Whitchurch-Stouffville, The Regional Municipality of York, having a
frontage'of approximately 60 feet on the east side of Market Street and a
flankage of approximately 150 feet on the north side of Somerville Street
in the downtown section of Stouffville.
"Situate on the property is a one-storey, concrete building used for
industrial purposes.
"Negotiations have been conducted with the owner and his solicitor, Mr.
G.C. Ness, of the legal firm Button, Armstrong & Ness, 6 Main Street East,
Stouffville, LOH lLO and, subject to the approval of your Committee,
agreement has been reached with respect to a settlement, as follows:
The settlement of compensation is to be the sum of $110,000.00,
plus Vendor's legal costs, being payment in full for all claims,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this acquisition and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements are to be paid. The Authority is to receive
a conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this
proposed acq~isition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
21. FLOOD LINE PLOTTING
ON THE HUMBER RIVER
A staff communication was presented, advising that the backwater calculation
and flood line plotting study presently being carried out by The Proctor
Redfern Group on the Humber River has resulted in the identification of a
problem upstream of Bolton on the Main Branch of the river, associated with
the stability of the Canadian Pacific Railway embankment near Cedar Mills.
Res. #44 Moved by: E.H. Card
Seconde~ by: Mrs. J.A. Gardner
RESOLVED THAT: The communication having regard to the Flood Line Plotting
Study on the Humber River be received; and
THAT the Proctor Redfern Group be authorized to carry out the hydraulic
and stability analysis of the Canadian Pacific Railway embankment on the
Main Branch of the Humber River at Cedar Mills at a cost estimated to be
$12,900.00. CARRIED;
22. COLONEL SAMUEL BOIS SMITH WATERFRONT AREA
-Navigable Waters Protection Act Application
Mrs. F. Gell declared a conflict of interest and did not take part in dis-
cussion or vote on the issue.
A staff communication was presented, advising that the Authority is in
receipt of communications from several individuals and organizations
objecting to the recent application of The Metropolitan Toronto and Region
Conservation Authority for approval of the filling proposed at the Colonel
Samuel Bois Smith Waterfront Area, as it pertains to the Navigable Waters
Protection Act.
Res. #45 Moved by: M.J. Breen
Seconded by: E.V. Kolb
RESOLVED THAT: The letters of objection to the approval of the Colonel
Samuel Bois Smith Waterfront Area under the Navigable Waters Protection
Act be received; and
THAT the objectors be advised that the Authority is committed to full
review and approval of the Master Plan under the Environmental Assessment
Act. CARRIED;
B-28 -12-
23. WATERFRONT LANDFILL SITES
-Charging for receipt of fill
A staff report was'7presented, advising that at Meeting i17/78 of the
Executive Committ~e, the staff was directed to prepare a detailed report
on the feasibility',of charging a fee for receiving fill at Waterfront
landfill sites.
Res. #46 Moved by: E.H. Card
Seconded by: H.G. Westney
RESOLVED THAT: The report on proposed fee charging at Waterfront landfill
sites be received; and
THAT the charging system to be implemented at Aquatic Park by the Toronto
Harbour Commissioners in April, 1979 be carefully monitored to determine
the overall feasibility of charging for receipt of fill;
AND FURTHER THAT in the interim, the Authority landfilling operations at
Humber Bay and Bluffers Park Waterfront Areas continue on a "no charge"
basis;
AND FURTHER THAT at such time as the Authority undertakes landfilling at
Colonel Samuel Bois Smith Park, or at any other new waterfront landfill,
serious consideration be given to assessing a charge for each load of fill
accepted.
CARRIED;
24. WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
-Erosion Control & Slope Stabilization in The
Regional Municipality of York: Proposed Remedial
Work - 19th Avenue, Lot 30, Concession 8, Town of
Markham (Rouge River Watershed)
A staff communication was presented having regard to proposed remedial
work at 19th Avenue in the Town of Markham, to prov.ide approximately 60
meters of rip-rap toe protection along the existing bank of the Little
Rouge Creek.
Res. #4'7 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Erosion control work be carried out in Lot 30, Concession
8, beside 19th Avenue in the Town of Markham (Rouge River watershed), at
an estimated cost of $8,000.00; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
25. WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
-Erosion Control & Slope Stabilization in The
Regional Municipality of York: proposed Remedial
Work - 14th Avenue, Lots 5-6, Concession 8, Town
of Markham (Rouge River Watershed)
A staff communication was presented having regard to proposed remedial
work in Lots 5-6, Concession 8, beside 14th Avenue in the Town of Markham.
Res. #48 Moved by: E.V. Kolb
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Erosion control work be carried out in Lots 5-6, Concession
8, beside 14th Avenue in the Town of Markham (Rouge River watershed), at
an estimated cos~ of $9,400.00; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED,
.
-13- B-29
NEW BUSINESS
26. QUOTATION #79-14
-Paper Products
A staff communication was presented advising that the following quotations
have been received for the supply of paper products for all Conservation
Areas for 1979:
Toilet Tissue Towelling
Rolled Interfold Single Fold Rolled
Kimberly Clark $31. 45 $32.41 $14 .74 $20.55
Huntington Laboratories 38.07 40.29 17.83 24.87
G.H. Wood 33.10 27.36 13.96 19.47
Res. #49 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: The price received from G.H. Wood fo+ 100 cases of rolled
toilet tissue at $33.10 per case; 30 cases of inter fold toilet tissue at
$27.36 per case; 100 cases of single-fold towelling at $13.96 per case;
and 50 cases of rolled towelling at $19.47 per case, totalling $6,500.30,
be accepted; this being the lowest quotation received.
CARRIED;
27. COMMONGREEN CONFERENCE, UNIVERSITY
OF GUELPH: ,MARCH 16 -l8 , 1979
-Attendance at
A staff communication was presented advising that the University of Guelph -
students and faculty from the environmental fields - is offering a three-
day course related to forestry, horticulture, landscape architecture and
the landscape industry in Ontario.
The programme is related to a variety of topics of value to the
Conservation Land Management Division in the planning and development of
conservation areas.
The one-day registration is $20.00 and the three-day registration is
$50.00.
Res. #50 Moved by: Mrs. L. Hancey
Seconded by: H.G. Westney
RESOLVED THAT: David Dyce, Adele Freeman and Paul Flood be authorized to
attend one day, and that Eric Oakleaf and Garry Misumi be authorized to
attend three days of the Commongreen Conference at the University of
Guelph on March 16-18, 1979; and
~IAT their expenses in connection therewith, in an estimated amount of
$225.00, be paid.
CARRIED;
28. CHAIRMEN'S COMMITTEE OF THE
ONTARIO CONSERVATION AUTHORITIES
-1982 Biennial Conference
A staff communication was presented advising that The Chairmen's Committee
of the Ontario Conservation Authorities has invited the authorities to
submit requests having regard to the location of the 1982 Biennial
Conference. Tne last Conference held in the Toronto area was in 1962.
Res. #51 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
invite the Chairmen's Committee of the Ontario Conservation Authorities to
hold the 1982 Biennial Conference in Toronto. '
CARRIED,
29. SUGARING OFF DAY - APRIL 7, 1979
.
A staff communication was presented advising that for a number of years,
the staff has been authorized to arrange for a 'Sugaring Off' Day in late
March or early April.
B-30 -14-
Res. 52 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: The staff be authorized to make the necessary arrangements
for 'Sugaring Off Day' to be held at Bruce's Mill Conservation Area on
Saturday, April 7, 1979; and
THAT Members of the Authority, Advisory Boards, Committees and Foundation,
Chairmen of the Regional Municipalities, Mayors, Reeves, Regional
Councillors, local M.P's and M.P.P.'s, Ministry of Natural Resources'
personnel, Authority staff and families be invited; and
THAT the charge for lunch be $2.50 for adults and $1.00 for children;
AND FURTHER THAT the media representatives and their families be invited
at no charge.
CARRIED;
30. THE EFFECTIVE SECRETARY SEMINAR:
SHERATON CENTRE HOTEL, APRIL 3, 1979
-Attendance at
A staff communication was presented advising that a one-day seminar for
secretaries will be held April 3, 1979 at the Sheraton Centre Hotel in
TOronto.
Res. '53 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: Mrs. Kay Conron, Executive Secretary, Miss Diane Warburton,
Historical Sites Division and Mrs. Marjorie Pudney, Information and
Education Division be authorized to attend 'The Effective Secretary'
Seminar at the Sheraton Centre Hotel, Toronto on April 3, 1979; and
THAT the course fee of $125.00 each be paid.
CARRIED;
31. AUTHORITY-Qt'lNED VEHICLES
-Purchase and Replacement
Res. #54 Moved by: M.W.H. Biggar.
Seconded by: E.H. Card
RESOLVED THAT: The staff be directed to review the policy having regard
to the purchase and replacement of Authority-owned vehicles and report to
a meeting of the Executive Committee prior to the autumn of 1979.
CARRIED ~
32. EXECUTIVE COMMITTEE MEETING i3/79,
MARCH 28, 1979:
MRS. GELL invited the members to hold Executive Committee Meeting '3/79,
March 28, 1979, at Humber College of Applied Arts and TeChnology (NOrth
Campus).
33. ADJOURNloiENT
On Motion, the Meeting adjourned at 12:05 p.m., March 7.
R.G. Henderson K.G. Higgs
Chairman Secretary-Treasurer
~ B-3l
,
the metropolitan toronto and region conservation authority
minutes REPORT i3/79 ------
EXECUTIVE COMMITTEE WEDNESDAY-MARCH-28-1979 '3/79
---~--- --------
The Executive Committee met in the Board Room, Humber College of Applied Arts
~nd Technology, Humber College Boulevard/Highway #27, on Wednesday, March 28,
1979, commencing at 10:00 a.m.
In the absence of the Chairman, who joined the meeting late, Mrs. F. Ge 11 took
the Chair.
PRESENT FOR THE MEETING
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
E.V. Kolb
Dr. T. H. Lei th
J.S. Scott
H.G. Westney
Authority Member D. DiGiannantonio
Authority Chairman R.G. Henderson
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Executive Secretary Mrs. K. Conron
Research Planner, Planning & POlicy Mrs. A.C. Deans
Head, Waterfront Section, WRD B.E. Denney
Head, Conservation Education Section, I&ED Miss A. Hayhoe
Development Co-ordinator, P&P J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
Senior Administrative Secretary Mrs. M. Mitchell
Supervisor, Accounting.Services, FD Mrs. M. Mosseau
ABSENT WERE
Members C.F. Kline
Mrs. S. Martin
Mrs. Gell welcomed the Members and staff to Humber College.
MINUTES
The Minutes of Meeting #2/79 were presented.
Res. 155 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Minutes of Meeting '2/79, as presented, be adopted as if
read.
CARRIED;
B-32 -2-
. .
SECTION I -
THE EXECUTIVE CO~1MITTEE SUBMITS TilE FOLLOWING ITEl~S FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
1. CONSERVATION LAND MANAGEMENT DIVISION
-1979 Budget Revisions
A staff communication was presented having regard to adjustments to the
. 1979 Budget for the Conservation Land Management Division.
Res. #56 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: The 1979 Budget Revisions for the Conservation Land
Management Division be received and appended as Schedule "A" of these
Minutes; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions for
the Conservation Land Management Division be included in the 1979
Budget Estimates of the Authority. CARRIED;
2. HISTORICAL SITES DIVISION
-1979 Budget Revisions
A staff communication was presented having regard to adjustments to the
1979 Budget for the Historical Sites Division.
Res. #57 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The 1979 BUdget Revisions to the Operations and Mainten-
ance Programme - Black Creek Pioneer Village for the Historical Sites
Division be received and appended as Schedule "B" of these Minutes.
CARRIED;
Res. #58 Moved by: M.W.H. Biggar
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The 1979 Budget Revisions to the Development Programme
for the Historical Sites Division be received and appended as Schedule "c"
of these Minutes; and
THE EXECUTIVE CO~1MITTEE RECOMMENDS THAT: The 1979 Budget Revisions for
the Historical Sites Division be included in the 1979 Budget Estimates of
the Authority.
CARRIED;
3. BLACK CREEK PIONEER VILLAGE
-Portable Shelter Building
A staff communication was presented having regard to the need for
temporary accommodation for student tours at the Black Creek Pioneer
Village.
Res. #59 Moved by: Dr. T.H. Leith
Seconded by: E.V. Kolb
RESOLVED THAT: The communication regarding proposed temporary shelter
accommodation for student tours at the Black Creek Pioneer Village be
received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Two portable classroom
buildings be moved from the Kortright Centre for Conservation to the
Black Creek Pioneer Village, to be used as temporary facilities, and
that the cost of $10,000.00 be paid from funds transferred from the
Special Revenue ACCOUnt.
CARRIED;
-3- , B-33
4. REPORT U/79
INFOR~~TION & EDUCATION ADVISORY BOARD
Report '1/79 of the Information and Education Advisory Board was
presented.
Res. ItGO Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Report il/79 of the Information and Education Advisory
Board be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Recommendations Nos. 1 and 2,
as set forth herein, be adopted:
U The proposed amendments to Ontario Regulation 845/77, As Amended,
as appended as Schedule "c" of the t-\inutes of Meeting 11/79 of
the Information and Education Advisory Board, be included in the
1979 Amendments to Ontario Regulation 845/77;
g The 1979 Budget Estimates of the Information and Education
Division - Operations and Water & Related Land Management com-
ponents, as amended and appended as Schedule "0" of these Minutes,
be included in the 1979 Budget Estimates of the Authority.
CARRIED;
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
5. THE B. HARPER BULL CONSERVATION FELLOWSHIP
AWARDS COMMITTEE FOR 1979
-Appointment of Authority Representative
A communication from the Chairman was presented having regard to the
appointment of an Authority representative to The B. Harper Bull
Conservation Fellowship Awards Committee for 1979.
Res. fl6l Moved by: Mrs. J.A. Gardner
Seconded by: E.H. Card
RESOLVED THAT: Dr. T.H. Leith be appointed the Authority's representative
for 1979 to The B. Harper Bull Conservation Fellowship Awards Committee.
CARRIED;
6. UPPER THAMES RIVER CONSERVATION AUTHORITY
-Visit to M.T.R.C.A.
A staff communication was presented advising that a request has been
received from Mr. J.R. Powell, General Manager of the Upper Thames River
Conservation Authority for permission to visit this Authority on May 31,
1979, during the spring tour of the U.T.R.C.A.
Res. fl62 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Upper Thames River Conservation Authority be advised
that The Metropolitan Toronto and Region Conservation Authority will be
pleased to have them visit projects of our Authority on May 31, 1979,
and to welcome the touring party as guests at lunch.
CARRIED;
7. QUOTATION #79-11
-Three 1979 MF-245 Diesel Tractors,
with Trades
A staff communication was presented advising that the following quotations
have been received (from the 6 invitations) for the supply and delivery of
B-34 -4-
three new 1979 MF-245 diesel tractors, with trades:
Sholdice Service & Supply $22,982.65
Rumble Tractor 25,466.00
Edwards Equipment Limited 26,536.00
Don Vallance Equipment Limited 26,744.65
A & W McKeown Limited 28,034.00
The above prices include all taxes.
Res. #63 Moved by: E.H. Card
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The quotation of Sholdice Service & Supply Limited for
the supply and delivery of three new 1979 MF-245 diesel tractors, with
trades, in the sum of $22,982.65, including all taxes, be accepted; it
being the lowest quotation received.
CARRIED;
8. FINANCIAL REPORT & ACCOUNTS
-January & February, 1979
Mr. Scott presented the Financial Report and Accounts for the months of
January and February, 1979.
Res. #64 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Financial Statement for the months of January and
February, 1979, be received; and the Authority Accounts, in the amount
of $1,387,133.53, being (a) Current Expenditures - Wages and Salaries
$524,25l.l7; Materials and Supplies $272,825.60; (b) Capital Expend-
itures - Wages and Salaries $37,454.27; Materials and Supplies
$552,602.49, be appxoved for payment. CARRIED;
9. REPORT #1/79
INFORMATION & EDUCATION ADVISORY BOARD
Report 11/79 of the Information and Education Advisory Board was presented.
Res. fl65 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Report 11/79 of the Information and Education Advisory
Board be received; and
THAT Recommendations #3 and fl4, as amended and set forth herein, be approved:
'3 The Metropolitan Toronto and Region Conservation Authority purchase
a quantity of reprints of the article "Conservation Education: The
Role of Ontario's Conservation Authorities", by T.. Carr and A. Foster,
printed in Volume 34, No.1 of the Journal of Soil and Water
Conservation (January-February, 1979) , for distribution to Members
and to members of Boards of Education in the area under the juris-
diction of the Authority.
!! The Chairman of the Information and Education Advisory Board and the
Administrator of the Information and Education Division, with power to
add, select a committee of three individuals not associated with the
Authori ty, to undertake an evaluation of all academic programmes at
the Albion Hills, Boyd, Claremont and Cold Creek Conservation Field
Centres.
CARRIED;
10. ADMINISTRATION OF ONTARIO REGULATION 735/73
-November/December, 1978; January/February, 1979
The staff presented a report concerning the administration of Ontario
Regulation 735/73 for the period November/December, 1978; January/February,
1979.
Res. 166 Moved by: Mrs. J.A. Gardner
Seconded by: M.W.H. Biggar
RESOLVED ~iAT: The report of the administration of Ontario Regulation
735/73 for the period November/December, 1978; January/February, 1979, be
-5- B-35
received and appended as Schedule "E" of these Minutes. CARRIED;
11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Regional Municipality of Durham
To cross the Duffin Creek with proposed watermain,
just north of Bayly Street, Town of Aj ax
A staff communication was presented advising that an application has been
received for a permit to install a water main across the Duffin Creek at
the above location.
Res. #67 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of
The Regional Municipality of Durham, ,be received; and
THAT the application of The Regional Municipality of Durham for a permit
to install a water main across the Duffin Creek in the area just north of
Bayly Street in the Town of Ajax (The Regional Municipality of Durham),
Duffin Creek watershed, be approved, subject to:
(a) The original creek configuration and cross-sectional area being
maintained;
(b) The gabion baskets placed on the banks of the creek being keyed
into the banks both upstream and downstream of the crossing;
. ,
(c) Every effort being made to minimize the silting of the creek
during construction.
(d) The actual crossing being undertaken no later than the end of
the month of September, 1979;
(e) The waters in the creek being allowed to flow through the creek
with minimum obstruction during the crossing;
(f) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED;
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Bryan Thomas & Associates, Consulting Engineers, on
behalf of D. Meharg and M. Vettese
To regrade existing valley side slope on Part Lot 10,
Concession 7, Town of Markham (Rouge River Watershed)
A staff communication was presented advising that an application has been
received for the proposed filling and grading at the above location.
Res. #68 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Bryan Thomas & Associates, Consulting Engineers, on behalf of D. Meharg
and M. Vettese, be received; and
THAT the application of Bryan Thomas & Associates, Consulting Engineers,
on behalf of D. Meharg and M. Vettese, for permission to regrade an
existing valley side slope on Part of Lot 10" Concession 7, Town of
Markham (Rouge River watershed), be approved, subject to:
(a) Prior to the issuance of a permit, the applicant submitting to the
Authority a plan and profile of the proposed filling and grading
for each and every lot (designated 128 as shown on the application);
(b) No interference of any kind taking place on the property immediately
east and abutting Lot 8, as shown on the plan;
(c) Compaction of the lower portions of the subject lots being in accord-
ance with the standard practices acceptable to the Soils Engineering
Association~
(d) No pelllli.t being issued for lots l-8 incl. until such ti.me' as the site specific for
1-8 incl. have been graded to the satisfaction of the Authority and the Tar.1n of
Markham; ,
(e) Every effort being made to minimize the silting of the R::>l>inson Creek during
construction.
CARRIED;
B-36 -6-
13. APPLICATION FOR PE~IIT UNDER ONTARIO REGULATION 735/73
Frenchman's Bay Yacht Club
Proposed shoreline protection and dock area dredging,
Town of Pickering (Waterfront)
A staff communication was presented advising that an application has been
received for a permit to dredge material from the Frenchman's Bay Yacht
Club docking area.
Res. #69 Moved by: J.S. Scott
Seconded by: H.G. Westney
RESOLVED THAT: The staff communication, together with the application of
Frenchman's Bay Yacht Club, be received; and
THAT the application of Frenchman's Bay Yacht Club for permission to
dredge material from their docking area and store it temporarily on
adjacent Authority lands, be approved, subject to:
(a) Dredged material removed from those locations shown on the attached
plan being stored temporarily on Authority property as shown on
this plan (approximately 70'x70' square) until full haulage load
limits are permitted on municipal roads;
(b) The storage site and grades being restored to the satisfaction of -
the Authority;
(c) The stora~e site being restricted from public access by erection of
snow fencing, as shown on the plan;
(d) The dyke being constructed on dredged course material east of storm
outfall to permit only liquid drainage into Bay waters.
CARRIED;
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of Transportation & Communications
To place fill in the valley of the Black Creek between
Queen's Drive and Lawrence Avenue West, City of North
York (Humber River Watershed)
A staff communication was presented advising that an application has
been received for a permit to place fill at the above location.
Res. #70 Moved by: E.V. Kolb
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the application of
the Ministry of Transportation and Communications, be received; and
THAT the application of the Ministry of Transportation and Communications
for a permit to place fill in two locations in the valley of the Black
Creek, in the area between Queen's Drive and Lawrence Avenue West, City of
North York (Humber River watershed), be approved, subject to:
(a) Every effort being made to prevent any silting of the creek during
the placing of the fill;
(b) The fill being placed in the same location as is shown on the plans
submitted;
(c) All areas disturbed due to construction being restored to the satis-
faction of the Authority.
CARRIED;
15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of Transportation & Communications
To place fill in the valley of the Black Creek at Eglinton
Ave. for the construction of the Northwest Metro Arterial
A staff communication was presented advising that an application has been
received for a permit to place fill at the above location.
Res. i71 Moved by: E.H. Card
Sec~nded by: H.G. Westney
.
.
r
-7- B-37
RESOLVED THA'l': The staff comn\unication, together with the application of
the Ministry of Transportation and Communications, be received; and
THAT the application of the Ministr~' of Transportation and Communications
for a permit to place fill in the Black Creek valley in the area
immediately north of Eglinton Avenue, be approved, subject to:
(a) The fill being placed in such a manner as not to cause siltation
of the creek;
(b) The fill being seeded as soon as possible after placement;
(c) All disturbed areas being restored to the satisfaction of the
Authority;
(d) The Ministry of Transportation and Communications reviewing the
necessity of providing erosion control works on the Black Creek
in the vicinity of the fill;
(e) The detail design being approved by the Authority;
(f) The development of the baseball diamond having the Authority's
approval prior to the construction of any facilities;
(g) The Borough of York ensuring the maintenance of the snow dump
area in order to keep it free from debris, etc.
CARRIED;
16. INTERIM WATER E RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT -
PETTICOAT CREEK WATERSHED
-Property: Bramalea Limited
Res. #72 Moved by: J.S. Scott
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Report (r-1arch 8, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
"Re: Project: Interim Water and Related Land Management Project
1979-l98l - Flood Plain and valley Land
Acquisition Component - Petticoat Creek Watershed
Authority: Executive Resolution No. 133, Meeting No. 4 -
April l2, 1978 and Authority Resolution No. 51,
Meeting No. 3 - April 21, 1978
Subject Property: East side of Rosebank Road
Owner: Bramalea Limited
Area to be Acquired: 23.171 acres, more or less
Recommended Purchase Price: $2,500.00 per acre, i.e., $57,921.50,
plus Vendors' legal and survey costs
and construction of a post and wire
fence.
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being Part of Lots 29 and 30, Range III, BFC, Town
of Pickering, The Regional Municipality of Durham, located on the east
side of Rosebank Road, south of Highway #401.
"Negotiations have .been conducted with officials of Bramalea Limited and,
subject to the approval of your Committee, agreement has been reached with
respect to a purchase price, as follows:
The p~rchase price is to be the sum of $2,500.00 per acre, i.e.,
$57,9 7.50, plus Vendors' legal and survey costs and construction
of a post and wire fence along the new property boundary, with
date of completing the transaction to be as soon as possible.
"I recommend approvat of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the transaction. All rea.sonable
expenses incurred.incidental to t~e closing, for land transfer tax, legal
costs and disbursements are to be paid. The Authority is to receive a
conveyance of the land required free from encumbrance.
B-38 -8-
"The Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.'
"Funds are available.
"An application has been made to the M,inister of Natural Resources' for
an Inspection Certificate."
17. WATERFRONT PROJECT 1977-1981:
ETOBICOKE SECTOR, HUMBER BAY AREA
-Property: Her Majesty the Queen
in Right of Ontario
Res. #73 Moved by: Dr. T.H. Leith
Seconded by: E.n. Card
RESOLVED THAT: The Report (March 14, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretar-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
liRe: project: Waterfront project 1977-1981, Etobicoke
Sector, Humber Bay Area
Authority: Executive Resolution No.460 - Meeting No.23 -
January 2l, 1976 and Authority Resolution
No.46, Meeting No.3 - April 9, 1976
Subject Property: South side of Lakeshore Blvd.
Owner: Her Majesty the Queen in Right of Ontario
Area to be Acquired: 0.120 acres, more or less
Recommended Purchase
Price: $100.00
"Included in the requirements for the above-noted project are two
irregular-shaped parcels of land, being Parts of Lots 6 and 7, Registered
Plan 83, Borough of Etobicoke, The Municipality of Metropolitan Toronto,
located on the south side of Lakeshore Blvd., west of Park Lawn Road.
"Negotiations have been conducted with officials of the Ministry of
Natural Resources and, subject to the approval of your Committee, agree-
ment has been reached with respect to a purchase price, as follows:
The purchase price is to be $100.00, with date of completing
the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements, are to be paid. The Authority is to
receive a conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for
an Inspection Certificate."
IS. THE MUNICIPALITY OF METROPOLITAN TORONTO
-Request for Authority-owned Land
Res. '74 Moved by: J!:.V. Kolb
Seconded by: M.J.' Breen
RESOLVED THAT: Three small parcels of land, containing a total area of
0.06 acres, more or less, being Part of Lot 27, Concession "B", F.T.H. ,
in the Borough of Etobicoke (The Municipality of Metropolitan Toronto),
which were inadvertently. expropriated by the Authority, be conveyed to
The Municipality of Metropolitan Toronto, for the widening of Albion Road,
for the nominal consideration of $2.00; and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20(c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78 as amended;
AND FURTHER THAT The appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
-9- B-39
19. CITY OF NORTH YORK
-Request for Permanent Easements
A staff communication was presented, advising that a request has been
received from the City of North York to provide permanent easements for
sanitary and storm sewers, required for residential development, south
of Steeles Avenue, between Bathurst Street and Dufferin Street.
The proposed easements affect Authority-owned land known as Parts of Lots
23 and 24, Concession II, W.Y.S., All of Block "0", Plan M-1859 and Part
of Virginia Street, Registered Plan 2570, City of North York (The
Municipality of Metropolitan Toronto.
Res. #7,5 Moved by: E.H. Card
Seconded by: E.V. Kolb
RESOLVED THAT: Permanent easements be granted to the City of North York,
required for sanitary and storm sewers for residential development, south
of Steeles Avenue, between Bathurst ~nd Dufferin Streets. Said easements
are shown as Part 1 on Plan reference No. 78-21-709-30, Parts l, 2 and 3
on Plan reference No. 76-60-21-709-3-1, Part 1 on Plan reference No.
76-60-21-709-3-2, Part 1 on Plan reference No. 76-60-21-709-3-3, Block "Oil
on Plan reference No. M-l859, all prepared by J.D. Barnes Limited,
Surveyors. The Authority-owned land affected is Parts of Lots 23 and 24,
Concession II, W.Y.S., All of Block "0", Plan M-1859 and Part of Virginia
Street, Registered Plan 2570, City of North York (The Municipality of
Metropolitan Toronto) . Said easements to be granted for the nominal con-
sideration of $2.00, subject to the City of North York being responsible
for carrying out and paying all legal, survey and other costs involved in
the transaction;
AND BE IT FURTHER RESOLVED THAT the appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
20. FLOOD WARNING SYSTEM
-Radio Communications Network
A staff communication was presented advising that in this final year of
a four-year programme for the development of the Radio Communications
Network for use in the Flood Warning System, and for normal day-to-day
operations, it is proposed to acquire in 1979 the following equipment from
Canadian Motorola Electronics Company:
.8 mobile radios
.2 portable radios
.miscellaneous equipment as required
at a total estimated cost of $15,000.00.
Res. 1176 Moved by: Mr.s. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The acquisition from Canadian Motorola Electronics Company
of Q mobile radios, 2 portable radios and miscellaneous equipment, at a
cost not to exceed $15,000.00, be approved.
CARRIED;
21: . COMMUNITY RELATIONS PROGRAMME
-Water Resource Division
A staff communication was presented having regard to a proposed 60-second
colour movie for use on television, depicting the hazards of spring
flooding and describing the Authority's Flood Warning System.
A proposal has been received from Amaranth Productions for a l6mm colour
60-second 'television spot' at a cost not to exceed $3,850.00.
Res. '77 Moved by: Dr. T.H. Leith
Seconded by: E.V. Kolb
RESOLVED THAT: The firm of Amaranth Productions be retained to produce ,
a 60-second l6mm colour "television spot" on flood control and flood
warning, at a total estimated cost of $3,850.00.
CARRIED;
B-40 -10-
22. WATERFRONT PROJRCT 1977-1981:
-Bluffers Park Phase II,
Launching Ramps & Day Mooring Docks
A staff communication was presented having regard to the construction of
permanent launching ramps and day mooring facilities at the above
location. The design of these facilities has been completed by the
Toronto Harbour Commissioners Engineering Department, and tenders have
recently been received, as fallows, for the construction of two double
concrete launching ramps, with vertical tie-up walls:
Disher Farrand Limited $199,900.00
Bermingham Construction 217,900.00
Canadian Dredge & Dock 229,225.00
Dean Construction Company 236,220.00
Tripp Construction Limited 239,575.00
Hadovic Construction Ltd. 339,872.00
Funds for these works are contained in the 1979 development budget for
Bluffers Park, Phase II.
Res. In Moved by: E.". Card
Seconded by: J.S. Scott
RESOLVED THAT: The contract for the construction of the launching ramps
and day mooring docks at Bluffers Park Phase II be awarded to Disher
Farrand Limi ted, in the amount of $199,900.00, subject to the concurrence
of the Ministry of Natural Resources.
CARRIED;
23. HYDROLOGIC MODELLING TECHNIQUES
-Proposed Standardization Programme:
University of Ottawa
A staff communication was presented having regard to a programme proposed
by the university of Ottawa to standardize and simplify hydrologic
modelling techniques. The Authority would be one of many users participat-
ing in this study and the costs of the programme will be financed by a
contribution of each participant of $3,000.00.
Res. #79 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
RESOLVED THAT: The Authority participate in the review and development of
standardization of storm water modelling as proposed by the University of
Ottawa at a cost of $3,000.00.
CARRIED;
24. WATERFRONT PROJECT 1977-1981:
-Bluffers Park Phase II,
Federal Assistance
A staff communication was presented having regard to information recently
received from the Small Craft Harbours Branch of Fisheries and Environment
Canada that $250,000.00 is available from 1978 funding to continue the
Small Craft Harbours Assistance Programme at Bluffers Park.
Res. 180 Moved by: Mrs. L. Hancey
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Small Craft Harbours Branch of Fisheries and
Environment Canada be advised that The Metropolitan Toronto and Region
Conservation Authority accepts its proposal to purchase and transport
materials to be used in the final armouring of the Bluffers Park project,
in the amount of approximately $250,000.00; and
THAT The Small Craft Harbours Branch be requested to give every con-
sideration to allocating additional funds within the 1979 budget to com-
plete the armouring of Bluffers Park Phase II;
AND FURTHER THAT the Authority express its thanks to the Small Craft
Harbours Branch and the Federal Members involved for the continuing
support of the Bluffers Park project.
CARRIED;
-11- B-41
25. ONTARIO PARKS ASSOCIATION CONFERENCE,
THUNDER BAY, ONTARIO, AUGUST 2-4, 1979:
-Attendance at
A staff communication was presented advising that the Ontario Parks
Association is arranging its 27th Annual Conference August 2-4, 1979
at Thunder Bay. The theme of this year's conference is Vandalism:
Its causes and Some Contemporary Solutions.
Res. 181 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Mr. w. Mulholland be authorized to attend the Ontario
Parks Association Conference in Thunder Bay, August 2-4, 1979; and
THAT his expenses, in an estimated amount of $300.00, be paid,
AND FURTHER THAT Mr. Mulholland and other members of staff attending this
conference present a report to the Executive Committee following the
conference.
CARRIED;
26. FOURTH HYDROTECHNICAL CONFERENCE,
VANCOUVER, B.C., MAY 7-11, 1979
-Attendance at
A staff communication was presented advising that the Canadian S9ciety of
Civil Engineers is holding the Fourth Hydrotechnical Conference in
Vancouver, B.C. May 7-11, 1979. The theme of this conference will be
River Basin Management and Cold Climate Hydrology.
Res. #82 Moved by: Mrs. L. Hancey
Seconded by: R.G. Henderson
RESOLVED THAT: Messrs. J.C. Mather and T.E. Farrell be authorized to
attend the Fourth Hydrotechnical Conference, to be held in Vancouver, B.C.
May 7-11, 1979; and
THAT their expenses in connection therewith, in an estimated amount of
$1,400.00, be paid.
CARRIED;
NEW BUSINESS
27. QUOTATION #79-17
-Fire Fighting Equipment
A staff communication was presented advising that the following quotations
have been received for the supply and delivery of 21 fire brooms, 21 pack
pumps and 30 one-hundred-foot lengths of fire hose:
Brooms Pumps ~
Dyer & Miller Brothers Limited $10.50 $72.61 $82.95
Wajax Industries Limited 20.76 82.14 91.41
The above prices do not include Provincial Sales Tax.
Res. 183 Moved by: Mrs. J.A. Gardner .
Seconded by: E.V. Kolb
RESOLVED THAT: The quotation received from Dyer & Miller Brothers Limited
for the supply and delivery of 21 fire brooms. @ $10.50 each, 21 pack pumps
@ $72.61 each, and 30 one-hundred-foot lengths of fire hose at $82.95
each, in the total amount of $4,233.81, plus Provincia~ Sales Tax, be
accepted; it being the lowest quotation received.
CARRIED;
-.-----
8-42 -12
28. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Family Leisure Centres of Canada Limited
To develop the 'Vaughan Theme Park', located south of
Major l-tackenzie Drive, east of Highway #400, Town of
Vaughan (Don River Watershed)
A staff communication was presented advising that an application has been
received for a permit to develop. the 'Vaughan Theme Park' at the above
location.
Res. 184 Moved by: Dr. T.H. Leith
Seconded by: M.J. Breen
RESOLVED THAT: The staff communication, together with the application of
The Family Leisure Centres of Canada Limited, be received; and
THAT the application of The Family Leisure Centres of Canada Limited for
a permit to develop the 'Vaughan Theme Park', located south of Major
Mackenzie Drive, east of Highway i400, Town 0 f Vaughan (The Regional
Municipality of York), Don River watershed, be approved, subject to:
(a) All developments being undertaken as shown on the plans submitted
to the Authority;
(b) Detailed design of the "Grist P-1ill" and liThe Hoedown" structures
located in the flood plain being submitted to the Authority for
review, and to illustrate that these structures will not be
adversely affected by flood waters, nor that they will be an
appreciable obstruction to the flood waters;
(c) Good construction practices being employed in an effort to
minimize the silting of the creek;
(d) Erosion protection being placed upstream and downstream of the
bridge crossings;
(e) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Town of Vaughan; ,
( f) The Town of Vaughan Engineering Department being satisfied with
the storm water management scheme.
CARRIED;
29. KIPLING AVENUE - PROPOSED EXTENSION
-Lake shore Boulevard to the Waterfront
MRS. GELL advised that the Board of Control of the Borough of Etobicoke
has requested a meeting of representatives of Humber College of Applied
Arts and Technology, The Metropolitan Toronto and Region Conservation
Authority and the Dorough of Etobicoke Engineer, to present a joint
report on the advisability of extending Kipling Avenue from Lakeshor~
Boulevard to the Waterfront. The College has appointed a representative
and it was suggested that Mr. Garrett represent the Authority.
It is imperative that this meeting be convened and the report of the ~
agencies submitted to the Board of Control as soon as possible.
30. EXECUTIVE COMMITTEE AGENDA
-Format
MRS. GELL requested that the staff investigate the possibility of
reproducing the Agenda on both sides of the paper as is the practice for
reproduction of the Minutes.
31. ADJOURNMENT
On Motion, the Meeting adjourned at 12:20 p.m., March 28.
MRS. F. GELL, Vice Chairman K.G. HIGGS
Acting Chairman Secretary-Treasurer
197 9 BUD GET REV I S ION S PAGE: 37
PROGRAM: Conservation & Recreation Land Management - Conservation & Niagara Escarp. Land (C2) DATE: March 21. 1979
PURPOSE: To acquire Conservation Area Lands as set out in the Authority's plan for ancillary conservation measures. The
purpose of such acquisitions is to bring into public ownership environmentally important lands such as source
and headwater areas.
FUNDING: This p~gram will be financed from Authority funds. The Project RL-26 "A project for the Extension of the Palgrave
Forest and Wildlife Conservation Area" was previously approved by the Executive and the Authority last year
(Resolution #332). but funds were not available at that time.
12
8
~
~ ~
I
. .
> w
.
ell
I
1 9 7 9 BUD GET REV I S ION S ..
..
PAGE: -2L
PROGRAM: Conservation & Recreation Land Management - Cons. & Niagara Escarpment Land (C2) DATE: ~Iarch 21. 1979
o RIG I N A L BUDGET REV I SED BUDGET
Sources of Financing Sources of Financing
Net Provincial Municipal Net Provincial Municipal
ACT I V I T Y Expenditures Grant Levy Other Expendi tures . Grant Levy Other
Conservation Area Land - - - - 48,800 - - 48,800
1 9 7 9 BUD GET REV I S ION S PAGE: 15
PROGRAf1: Operations and Maintenance - Black Creek Pioneer Village Operations DATE: 1979-03-12
PURPOSE: To re-allocate activities to give a clearer picture of the financial operation at Black Creek Pioneer Village
FUNDING: There is no change in total funding
(I)
n
=
t:\I
t:l
C
t"'
t:\I
III
'" I
III olio
= U1
CD
I
1 9 7 9 BUD GET REV I S ION S ..
PAGE: ~ Q\
~:::~r;p.Ar1: Operations and Maintenance - Black Creek Pioneer Vi11aae Operations DATE: 1979-03-12
o RIG I N A L BUD GET REV I SED BUDGET
Sources of Financing Sources of Financing
Provincial Municipal Provincial lolunicipal
ACTI\'ITY Expendi tures Grant Levy Revenue Expenditures Grant Levy Revenue
Admi ni strati on 174.500 174.500 178 .000 178.000
Building Staff & Internal Activities 285.750 72.000 213.750 338.600 72.000 266.600
'Gate House 14.250 14.250 16.500 16.500
Gift Shop J74.750 174.750 122.600 122.600
li ves tock 51 .500 51.500 55.500 55.500
Maintenance of Buildings 69.750 69.750 64.000 64.000
Maintenance of Grounds 51.500 51.500 49.300 49.300
Registrar 23.750 23.750 21.500 21.500
Security 18.500 18.500 18.400 1B.400
Special Days. Events. Displays 13.000 13.000 13.000 13.000
Wedding Program 5.500 5.500 5.600 5.600
Winter Program 6.250 6.250 6.000 6.000
Admission Receipts (405.000) 405.000 (405.000) 405.000
Endowment Fund Interest ( 10.000) 10.000 ( 10.000) 10.000
Food Services ( 40.000) 40.000 ( 40.000) 40.000
Photography ( 4.000) 4.000 ( 4.000) 4.000
Sales Outlets (275.000) 275.000 ~275.000) 275.000
.Weddings ~ 14 .OOO~ 14.000 14.000) 14.000
Rentals & Miscellaneous 2.000 2.000 ( 2,000) 2.000
889.000 72,000 67,000 750,000 889,000 72,000 67,000 150,000
1 9 7 9 BUD GET REV I S ION S PAGE: 49
PROGRAM: Historic Sites Development DATE: March 21, 1979
PURPOSE: To bring into line the approvals and availability of funds from Wintario and the Foundation.
FUNDING: The Metropolitan Toronto and Region Conservation Foundation and Wintario.
fn
n
::c
l'2
g
t"'
l'2
ll:I
" I
n ..
. -.J
ll'
I
1 9 7 9 BUD GET REV I S ION S ..
IX)
PAGE: ~
PROGRAM: Historic Sites Development DATE: ~1arch 21. 1979
o RIG I N A L BUD GET REV I SED BUDGET
Sources of Financing Sources of Financing
Net Provincial Municipal Net Provincial Municipal
ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other
Roblin's Mill 1.000 - - 1.000 - - - -
Boardwalk 1.000 - - 1.000 - - - -
Taylor Cooperage (Incl. HER 12013) 30.000 - - 30.000 30,000 - - 30.000
Richmond Hill ~mnse 10.000 - - 10.000 18.000 - - 18.000
Collection 6.000 - - 6.000 - - - -
Original Wintario Submission
('DIE CAP 17449) - - - - 917 - - 917
Sawyer's House - 33 1/3\ ) 12.000 - - 12.000 12.000 - - 12.000
- Furnishings 50\ )
60.000 - - 60.000 60.917 - - 60.917
1 9 7 9 BUD GET REV I S ION S PAGE: ...!L-
PROGRAM: Operations - Maintenance - Community Relations - Information & Education DATE: March l2, 1979
Operations
o RIG I N A L BUD GET REV I SED BUDGET
Sources of Financing Sources of Financing
Net Provincial Municipal Net Provincial Municipal
ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other
Albion Hills C.F.C. - - - - - - - -
Boyd C.F.C. - - - - - - - -
Claremont C.F.C. - - - - - - - -
Cold Creek C.F.C. - - - - - - - -
Lake St. George C.F.C. - - - - - - - -
General Interpretive Program - - - - - - - -
B.C.P.V. Pioneer Life Program 10,000 - 10,000 - 13,000 - 10,000 3,000
B.C.P.V. Tour Program 31,300 - 31,300 - 33,300 - 31,300 2,000
Kortright 55,000 18,000 32,000 5,000 55,000 18,000 32,000 5,000
U)
n
:x:
t:J
g
I:"'
t:J
al
- : I
0"
:\1)
.
.\
III
1979 CURRENT-BUDGET ESTIMATES I
VI
0
PROGRAM OPERATIONS & l~INTENANCE - CO~~1UNITY RELATIONS - INrORMATION & EDUCATION OPERATIONS PAGE --D..:.-
PURPOSE: To provide an outdoor and conservation education programme for school students and other community
groups at four Conservation Field Centres and a variety of outdoor and conservation education
opportunities for the general public and school groups at the Kortright Centre for Conservation
and at the Black Creek pioneer villa~e.
1979 OBJECTIVES: _ a continuation of the programme at the same level of service as in 1978 for existing facilities
_ the opening of the Kortright Centre Building for public use
_ to provide an outdoor and conservation education programme for the following estimated number of
students and adults:
- Black Creek Pioneer Village 64,000
- Conservation Field Centres 15,500
- Albion Hills Conservation Farm 9,000
- Maple Syrup Days 31,000
_ Special Days, Field Trips, Claireville Darn Tours etc... 12,000
- Kortright Centre for Conservation 50,000
?':~:nI~G : Program revenues and the General Levy on all participating municipalities. A surplus or deficit on
the operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited to
the participating boards of education. A grant of $18,000 fron the Provincial Xinistry of Culture
and ~ecreation.is estimated for the operation of the Kortright Centre for Conservation and The
Metropolitan Toronto and Region Conservation Foundation Kortrip,ht Centre Growth Endo~~ent Fund ($5.000).
FI~ANCIAL COMMENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures.
The net cost to the municipalities is estimated at $73,300, a decrease of $30,000 over 1978
budget.
OBJECTIVE CLASSIFICATIONS:
Materials
Salaries Supplies & Real Services Financial
& Wages utili ties Equipment Property & Rents Taxes Expenses Total
$ $ $. $ $ $ $ $
467,200 140.500 38,300 - 213,000 - - 859.000
1979 CU::~REr~T 8L;DGcT ES-firiA:iES
PR~:;~:'M OrER,\TIONS 6 mIXTEt\,\:'IiCE - CO~~IUXITY RELATIO:-:S - It{FOR,..ATION 6 EllllCATION OrERr\TIO~S ?,-~ 14,
-". -
1 19i!) BUDGET r SOURCES OF FINANCING ) 1578 ACTUALS 1975 EC:)C:~T I
:'CTlVITY NET PROVINCIAL MUN!CIPAL I EXPEl\:OITUF.::S I -X==-"j'-"==-~ I
i EXPENDITURES REVENUES EX?ENDITURES GRANT LEVY OTHER REVENUES Ii Co . _to .1""'...:.;:) ~~V~~~:.:~S
, i
I
: Albion Hills C. F .C. 147,500 147.500 - - - - 126,035 131,793 1011,000 IoU ,000
Bard C.F.C. 167,000 167,000 - - - - 165,597 165,597 155,000 155,000
Claremont C.F.C. 151,500 151.500 - - - - 146.151 146,099 141,000 142.000
Cold Creek C.F.C. 36,500 36.500 - - - - 38,671 37 ,13-~ 3.a,OOO 35.000
take St. George C.F.C. 68,500 68,500 - - - - - - - -
.Albion Hills Farm ) 18,201 8,.a14 30,100 :?i,OOO I
IAlbion Hills Operations ) IXCLUDED I . GE~ER:\L IXT RPRETJ\'E rROGI ~I 656 - 3,.100 3.800
i Sruce' s ~Ii 11 ) 2,515 2,515 I 3,000 I 3,000
;General Interpretive Prog. 10,500 10,500 - - - - - - - -
iE.CoP.V. Pioneer Life 37,500 24,500 13,000 - 10,000 3,000 37,835 23,8iO 43,000 :?1,700
I. ,.. "\' T 73,000 39,700 S3,SOO I - SI,SOO 70.770 31,814 I 74,000 :?5,000
.. . _ 0' 0 0 ours 2,000
! i:ort ri ght 167,000 112,000 55,000 18,000 32,000 5,000 93,711 25,826 I 85,000 37,000
,
Farm Conversion - - - - - - 63,894 54,007 I - -
I .
I
I
! ,
I
I
; I
J I J
I\.. I
- )( i I 101 , 300 ) ( 18,000 I 73,300 I 10,000 )( 764,OS6 I 62i,069 )( 709,500 I 591.500 )'r
i TOT,\L 859,000 75 1~ 700
. U1
....
UI
I
1 9 7 9 '"
BUD GET REV I S ION S N
PAGE: .ll.-
PROGRAM: Water & Related Land Management - Community Relations (Development) W.lO DATE: March 12,1979
o RIG I N A L BUDGET REV I SED BUD GET
Sources of Financing Sources of Financing
Net Provincial t-Iunicipal Net Provincial t-Iunicipal
ACT I V I T Y Expenditures Gr:lnt Levy Other Expenditures Grant Levy Other
Kortright 292,472 41,800 34,200 216,472 - - - -
Albion Hills C.F.C. 12,000 - - 12,000 7,000 - - 7.000
Lake St. George 171,722 - - 171,722 - - - -
1979 CURRENT BUDGET ESTIMATES
PROGRAM Water-and Related Land Management - Co~unity Relations (Development), (WlO) PAGE 21.
PURPOSE: To develop the facilities required for the Authority's Outdoor and Conservation Education Programs.
1979 OBJECTIVES: - the development of trails, outdoor exhibits and demonstrations at the Boyd Conservation Education
Complex
- completion of the construction, initial furnishings, equipment and exhibits for the Kortright
Centre for Conservation
- to carry out the construction and development of the Lake St. George Conservation Field Centre
FUNDING: For the development of the Kortright Centre for Conservation, 55% of the funding is from the
Province of Ontario, the balance from the General Levy.
For the Exhibit Program. the $216.472 is dependant on funds from The Metropolitan Toronto and
Region Conservation Foundation and from Wintario.
$12,000 for the improvement of the Albion Hills Conservation Field Centre ~ill be funded from
special revenue.
OBJECTIVE CLASSIFICATIONS: . Materials
Salaries Supplies & Real Services Financial
& t-1a~es Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
170,425 200,000 - - 100,769 - - 471,194
tlI
I
U1
W
1979 CURREr~T ."'U:-\'''' ....- ESTiiJiATES
tj LlL;c i Cll
I
22, U1
P~O~~~t.r' WATER & RELATED L\:'<:D ~IA.'I/'\CE~IE:\'T - CO~l.\!U:'<:JTY RELATIO~S (DE\o'ELOP~IENT) (In 0) P".::- ..
~\J_
f li EX;:EN!)!TUR:.5 1979 BUDGET SOURCES OF FINANCING 1978 ACTU:\LS 1978 BUr-GET
ACTIVITY REVEi\:UES NET PROVINCI.\L MUr-.::CIPAL OTHER EX;:ENCliU?ES REVE!I.'UES ~X::::-"D'TU-S I R::'\ .::-..' 'c--
EXPEND!TUF\ES GRANT LEVY to . -.. :'\ I - .-....-;)
I
KOTtt:.ight 292,472 - 29~,472 41,800 34,200 216,472 171,085 - 190,000 -
Albion Hills C.F.C. ~,OOO - 7,000 - - 7,001) - - - -
Lake St. George 171,722 - 171,722 - - 171,722 788 - I - -
I
I
1
I I
I
I
I
I I
I
, j , ,
-L
... .
~[ '. 471,194 )( I 34,200 I 395,194 I )(
TOTAL )( - 4~71~194 I .. I 41,800 )( 266,649 - 288,000 I - )
.
m: . ExeCutive Ccmn.ittee, M.T.R.C.A., '3/79
RE: Administration of Ontario Regulation 735/73- - November and Dec:ellber, 1978 .AND Janucu:y and February, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Town of Vaughan V-218, York Excavating Ltd.., Filling stopped and the area re-shaped.
, West bank of the Don River NoveIlber 2, 1978
~ of 8635 Keele Street
Borough of North York V-219, Villa Paving Ashphalt Fill renoved..
East bank of the Ete~ Creek November B, 1978
~ of 3350 Weston a:>ad .
Town of Ca1edon (Albion) Site visit nade and it was agreed to let them
West bank of the Hunber River V-220, Edelweiss Sports Centre OOIlplete the tile !!led, seed or sod sane when
West side of Glasgow Road, November 7, 1978 weather permits. Has very little iJrpact on
IDt 9, Concession 6 storage of flood waters.
Town of Caleoon (Albion)
West bank of the Hunber River V-221, Virginia Aggregate Q)., As al:xJve.
West side of Glasgow lbad, November 7, 1978
IDt 9, Concession 6
City of Branpton Has stopped "-'Ork on valley and watercourse.
South side of 17th Line, V-222, Mr. W. Ololodny
West of 8th Q)ncession November 17, 1978 No clean-up of area.
No contact by phdne or letter. tn
Pt. IDt 17, Concession 8 n
::x:
t1j
c
G::
t"
1979.03.19 t1j
tXI
/It I
t1j U1
= U1
.
._-
'.
tll
'1'0: Executive Carmittee, M.T.R.C.A., #3/79 I
U'I
Administration of Ontario Regulation . 735/73 - November 'and DeceIrber, 1978 0'1
RE: AND .. Jammry and February," .1979. 2.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
, Borough of Etobicoke
N:>rth side of Rathburn lbad V-223, Blyth Hill Holdings Filling stopped.
East of Martin Grove lbad November 20, 1978 Area presently under discussion with our staff
Lot 12, Concession 1, Reg. Plan 4532 and the Borough of Etobicoke staff.
'!OWn of Riclmond Hill V-224, Mr. Luigi parravano
East branch of the Don River .. We have a letter from Mr. Parravano stating he will
, Rear of 16 Kersey Cras." November 20, 1978 renove fill and clean up the property to our
, East of Bathurst Street satisfaction in Spring 1979.
N:>rth of \oJe1drick ,!bad 1 .
Pt". Tnt- -.II., 'WV~
, '!OWn of Richnond Hill
East branch of thE:i Don River V-225, Coreydale Contracting As above.
Rear of 16 Kersey Cres., November 20, 1978
East of Bathurst Street
N:>rth of \oJeldrick Ibad
pt. Lot.43 _ Concession 1 WYS
Borough of Etobicoke V-226, Fe:r:mar Paving Ltd., Filling stopped.
N:>rth side of Rathburn lbad Area presently under discussion with' our staff and
East of Martin Grove lbad November 20, 1978 the Borough of Etobicoke staff.
Lot 12, Concession 1
Reg. Plan 4532 .
'!OWn of Pickering
South of Hwy. 401 V-227, Mrs.. Orsola Massara Being dealt with by Pickering by-law (road
West of R>sebank lbad South November 20, 1978 allowance)
N:>rth of Toyndale Permit application ;in process.
Lot 8, pt. ":/ & 9, ~ge 1, R.P. 230
.
1979.03.19
/It
,
ro: Executive Camlittee, M.T.R.C.A., #3/79
RE: AC:ninistration of Ontario Regulation 735/73 - NoventJer and Deceaber, 1978 AND Januaxy and February" 1979. 3.
LOCATION VIOLATION NOTICE ISSUED ACTION TAI<EN
Tor1n of Pickering
SOUth of Hwy. 40l V-228, Mr. M:!rsina Par As per previous page.
west of R:>sebank lbld SOUth November 20, 1978
North of Toyndale
IDt 8, pt. & & 9, Range 1, R.P. 230
V-229 Destroyed.
Borough of Etobiooke
Wast bank of Mimioo C%eek V-230, Mr. Joseph SZybalski. Filling stopped.
East of Residence at i55 oaJcfield lbld November 28, 1978 Area re-shaped by owner.
Tor1n of vaughan
North side of Teston lbld V-23l, Cbreyda1e Omtracting Cb. Filling stopped.
Wast of Bathurst Street OWner and engineering firm presenting discussing
pt. IDt 26, Concession 2 December 12, 1978 with Ml'a:A staff.
I):)n River wate~
Tor1n of Vaughan
North side of Teston lbld V-232, Mr. F. Andriano
Wast 'of Bathurst Street DeoeIIber 12, 1978 As above.
pt. rot 26, Concession 2
I):)n River watershed
1979.03.19
/It
=
I
UI
....
#3/~9 III
'lU: Executive Calr.Ii.ttee, M.T.R.C.A., I
UI
Admi.nistration of Ontario Regulation 735/73 - NoveI1iJer and Decen'ber, 1978 CD
RE: AND Janua%Y and February,. 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Town of vaughan
West side of Keele Street V-233, Mr. !eo Persits Filling stopped.
North of Iangstaff !bad December 20, 1978 Area xe-shaped.
Rear of 8672 Keele Street
V-234 Destroyed.
1979.03.19
/It
-... B-59
,
the metropolitan toronto and region conservation authority
minutes Report i4/79
-~
EXECUTIVE COMMITTEE WEDNESDAY-APRIL-11-1979 14/79
-- -----------
The Executive Committee met in the Board Room, Authority Office, 5 Shoreham
Drive, Downsview, on Wednesday, April 11, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
D.W. Kitchen
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Research Planner, Planning & Policy Mrs. A.C. Deans
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Development Co-ordinator, Planning & POlicy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
HEARINGS:
Following the Roll Call, the Meeting recessed to h9ld Hearings re:
(1) Mr. Peter Darling - on behalf of -
Mr. C.B. Martin
City of Brampton
Etobicoke Creek Watershed
(2) Jerome Markson Architect - on behalf of -
Toronto Jewish Congress
City of North York
Don River Watershed
Miss L. Trivelli recorded the proceedings o~ the Hearings.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
D.W. Kitchen
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Research Planner, Planning & Policy Mrs. A.C. Deans
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Finance Division A.D. Harris
B-60 -2-
PRESENT FOR THE MEETING (Contd.)
Adm. - Property & Administration Division W.E. Jones
Development Co-ordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
ABSENT WERE
Members M.J. Breen (Jury Duty)
Mrs. S. Martin
MINUTES
The Minutes of Meeting #3/79 were presented.
Res. i85 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Minutes of Meeting i3/79, as presented, be adopted as if
read. CARRIED;
SECTION I
THE EXECUTIVE COMMITTl;:E SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
1. REPORT U/79 - FINANCE SUB-COMMITTEE
AND DRAFT REPORT OF THE 1978 AUDITED
FINANCIAL STATEMENT
Messrs. J. Hambly, E. Ford and B. van Delft represented Clarkson, Gordon
& Company. Mr. J. Hambly presented the draft report of the 1978 Audited
Financial Statement.
The Chairman thanked Mr. Hambly for his presentation.
Report 11/79 of the Finance Sub-Committee was presented.
Res. '86 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: Report #1/79 of the Finance Sub-Committee be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT:
11 The 1978 Auditors' Report and Financial Statement to December 31, 1978,
as prepared and presented by Clarkson, Gordon & Company, be received,
approved, signed by the Chairman and Secretary-Treasurer of the
~uthority, and filed;
'2 THAT a Vehicle and Equipment Pool Fund be established in accordance
with the Ministry of Natural Resources' Policy,Procedures and
Information Manual for Conservation Authorities;
'3 THAT the Operating Fund deficit in th~ amount of $62,206.00, as at
December 31, 1978, be financed from the Special Revenue Account of the
Authority.
CARRIED;
2. THE METROPOLITAN TORONTO AND REGION
CONSERVATION FOUNDATION
-Appointment of New Members
Mr. E.H. Card, Chairman of The Metropolitan Tqronto and Region Conservation
Foundation, presented a communication with regard to the appointment of new
members to the Foundation.
Res. #87 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
-3- B-6l
RESOLVED THAT: The communication from Mr. Card be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following recommendation of
the Chairman, The Metropolitan Toronto and Region Conservation Foundation,
be approved:
THAT Dr. Walter Tovell, Head of the Ontario Museums' Support and Advisory
Section, Associate Professor of the Faculty of Education of the University
of TOronto and Associate Professor of the Department of Geology of the
University of Toronto; and Mr. Thomas R. Webb, Assistant Vice President,
Public Affairs, Bell Canada, Ontario Region, be appointed as Members of
The Metropolitan Toronto and Region Conservation Foundation for a three-
year period, effective May 1, 1979.
CARRIED J
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
3. DECISION OF HEARING
Mr. Peter Darling - on behalf of -
Mr. C.B. Martin
City of Brampton
Etobicoke Creek Watershed
Res. 188 Moved by: Mrs. F. Gel!
Seconded by: 'C.F. Kline
RESOLVED THAT: The application of Mr. Peter Darling, on behalf of Mr.
C.B. Martin, City of Brampton (Etobicoke Creek watershed) be deferred, at
the request of the applicant.
CARRIED;
4. DECISION OF HEARING
Jerome Markson Architect - on behalf of -
TOronto Jewish Congress
City of North York
Don River Watershed
Res. 189 Moved by: Mrs. F. Gell
Seconded by: C.F. Kline
BE IT RESOLVED THAT: This Executive Committee confirm the decision of. the
Hearing held this 11th day of April, 1979; and
THAT the application of Jerome Markson Architects, on behalf of the
TOronto Jewish Congress, in accordance with Ontario Regulation 735/73, for
permission to construct a seven-storey building immediately north of the
existing Y.M.H.A. complex, adjacent to Bathurst Street, together with'the
staff communication, be received; and
THAT a permit be issued subject to the following conditions:
(a) The applicant assuring the Authority, by means of detailed plans,
that the proposed construction will not contribute to erosion or
instability of the existing bank;
(b) The applicant undertaking and complying with the recommendations
of the soils' report as prepared by The Trow Group Limited;
(c) The applicant complying with all existing regulations and by-laws.
CARRIED J
B-62 -4-
5. REPORT U/79
PERSONNEL SUB-COMMITTEE
Report #1/79 of the Personnel Sub-Committee was presented.
Res. #90 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Report #1/79 of the Personnel Sub-Committee be received,
approved and appended as Schedule "A" of these Minutes.
CARRIED;
6. REPORT n/79
RECOGNITION Sub-COMMITTEE
Report #1/79 of the Recognition Sub-Committee was presented.
Res. #91 Moved by: Mrs. J.A. Gardner
Seconded by: E.H. Card
RESOLVED THAT: Report #1/79 of the Recognition Sub-Committee, as amended,
be received and appended as Schedule "B" of these Minutes.
CARRIED;
7. QUOTATION #79-12
-Machinery Rental Rates:
Conservation Area Development
A staff communication was presented advising that the following quotations
have been received for the supply of earth-moving equipment required for
the development of Conservation Areas during 1979. The quotations include
bulldozers, loaders, graders and motorscrapers on a per hour basis:
QUOTATION RECEIVED
FROM
HERBERI'M. mVIS AMBLER-
~IPMENr CX>NSTRUCl'ION LTD. CDUR'rnEY REPJ\C
Per Hour Rental PerHaur Per Hour
$ $ $
DB Dozer ------------ 42.50 49.00 55.00
D7 Dozer ------------- 39.50 39.00 44.00
TD 15 Dozer ----------- 34 .50 - -
Track IDader ---------- 32.00 33 . 00 33.00
)btor Grader --------- 28.00 33.00 34 .00
Ibtor Scraper --------- 46.00 48.00 45.00
Operator ;..--- ---- Included InclOOed Included
Float lobve ---------- Included ($60.00 to Inclu1ed
($90.00 each
Since this equipmant must be used in cx:rrbination, particularly with notorscrapers and
dozers, it is evident that the total qootation sul:mitted by Herbert M. Davis Construction
Limited is the lowest hourly rental for the necessary equiptent.
, Res. i92 Moved by: E.H. Card
Seconded by: E.V. Kolb
RESOLVED THAT: The quotation received from Herbert M. Davis Construction
Limited for the supply of earth-moving equipment for Conservation Areas'
development during the 1979 season, at the hourly rental basis, be accepted;
it being the lowest quotation received.
CARRIED;
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of the Environment
To install a sanitary sewer as Phase II of proposed York-Durham
Sewage Scheme, extending north a distance of 3l69m, crossing
Langstaff Road on the east side of Keele St., Town of Vaughan
(The Regional Municipality of York) , Don River Watershed
A staff communication was presented advising that an application has been
-5- B-63
received for a permit to install a sanitary sewer at the above location.
Res. #93 Moved by: Mrs. L. Hancey
Seconded by: M.W.H. Biggar
RESOLVED THAT: The staff communication, together with the application of
the Ministry of the Environment, be received: and
THAT the application of the Ministry of the Environment for a permit to
undertake the construction of a sanitary sewer as Phase II of the proposed
York-Durham Sewage Scheme, extending north a distance of 3l69m crossing
Langstaff Road on the east side of Keele Street in the Town of Vaughan
(The Regional Municipality of York), Don R~ver watershed, be approved,
subject to:
(a) All manholes being equipped with water-tight covers;
(b) Every effort being made to minimize the silting of the river
during construction;
(c) Every effort being made to minimize the disturbance of the
existing vegetation in the valley;
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Town of vaughan;
(e) An easement being obtained to enter and do work on Authority-
owned lands.
CARRIED;
9. WATERFRONT PROJECT 1977-1981:
ETOBICOKE SECTOR, COL. SAMUEL BOIS SMITH AREA
-Property: Her Majesty the Queen in Right of Ontario
Res. 194 Moved by: J.S. Scott
Seconded by: Mrs. J .A. !Gardner
RESOLVED THAT: The Report (March 27, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED;
liRe: Project: WATERFRONT PROJECT 1977-1981
Etobicoke Sector
Colonel Samuel Bois Smith Area
Authori ty: Executive Resolution No. 460, Meeting No.23 -
January 21, 1976 and Authority Resolution No.46,
Meeting No.3 - April 9, 1976.
Subject
Property: South side of Lakeshore Blvd.
Owner: Her Majesty the Queen in Right of Ontario
Area to be
Acquired: 1.194 acres, more or less
Recommended
Purchase Price: $100.00
"Included in the requirements for the above-noted project is a parcel of
land, being part of the bed of Lake Ontario, in front of Block "A" and
Lakeshore Drive, Registered Plan 1592, Borough of Etobicoke, The
Municipality of Metropolitan Toronto, having a frontage of approximately
203 feet on the south side of Lakeshore Blvd., west of 5th Street in the
New Toronto Area.
"Negotiations have been conducted with offiqials of the Ministry of
Natural Resources, and, subject to the approval of your Committee, agree-
ment has been reached with respect to a purchase price, as. follows:
The purchase price is to be $100.00, with date of completing the
transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All reason-
able expenses incurred incidental to the closing, for land transfer tax,
B-64 -6-
legal costs and disbursements are to be paid. The Authority is to
receive a conveyance of the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Func!ls are available.
MAn application has been made to the Mini,ster of Natural Resources for an
Inspection Certificate."
10. INTERIM WATER & RELATED LAND ~rnNAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT - DON
RIVER \oJATERSHED
-Property: The Governing Council of the University of
Toronto and Connaught Laboratories Limited
Res. #95 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The Report (Apr il 3, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED
liRe: project: Interim Water and Related Land Management Project
1979-1981 - Flood Plain and Valley Land 'Acquisition
Component - Don River Watershed
Authority: Executive Resolution No.133, Meeting No.4 - April
12, 1978 and Authority Resolution No.5l, Meeting No.3,
April 21, 1978
Subject
Property: South side of Fisherville Road
OWners: The Governing Council of the university of Toronto
and Connaught Laboratories Limited
Area to be
Acquired: 0.921 acres, more or less
Recommended
Purchase Price: The nominal consideration of $2.00
"Included in the requirements for the above-noted project is a rectangula~-
shaped parcel of land, being Part of Virginia Street, as closed by a
Judge's Order dated October 26, 1944, City of North York, The Municipality
of Metropolitan Toronto, located on the south side of Fisherville Road,
east of Davey Street.
"Negotiations have been conducted with officials of the University of
Toronto and Connaught Laboratories Limited and, subject to the approval of
your committee, agreement has been reached with respect to a purchase price,
as follows:
The purchase price is to be the sum of $2.00, with date of completing
the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. All r~ason-
able expenses incurred incidental to the closing, for land transfer tax,
legal costs and disbursements are to be paid. The Authority is to receive
a conveyance of the land required free from encumbrance.
liThe Administrator of the Water Resource Division has reviewed this
proposed acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
11. THE CORPORATION OF THE BOROUGH OF SCARBOROUGH
-Request for Authority-owned Land
Res. '96 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
.
RESOLVED THAT: A parcel of Authority-owned land, containing 0.05 acres,
more or less, be conveyed to the Corporation of the Borough of Scarborough,
for the construction of a walkway running westerly from Kennedy Road, north
of Sheppard Avenue East. Said land being Part of Lot 29, Concession III,
Borough of Scarborough, The Municipality of Metropolitan Toronto.
-7- B-65
Consideration to the nominal sum of $2.00; and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20(c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78, as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
12. REPORT U/79
WATERFRONT ADVISORY BOARD
Report il/79 of the Waterfront Advisory Board was presented.
Res. '97 Moved by: E.V. Kolb
Seconded by: D.W. Kitchen
RESOLVED THAT: Report 11/79 of the Waterfront Advisory Board be received;
and
THAT Recommendations #1, 12 and 13, as set forth herein, be approved:
n The Delegation - for WARD 9 Citizens' Association, Shoreline
Stabilization - Eastern Beaches, City of Toronto, be advised that
the proposed works are within the existing priorities established
by the Waterfront Advisory Board and that the work will be carried
out if additional funds are made available; and
That the Chairman of the Authority be requested to make a sub-
mission to the Province of Ontario for approval of additional funds
to permit the Authority to undertake urgent shoreline management
projects; and '
That the Borough of Scarborough, the City of Toronto, the Borough'of
Etobicoke and The Municipality of Metropolitan Toronto be requested
to support the Authority's application to the Province of Ontario
for additional funds for urgent shoreline management projects,
E The 1979 Waterfront Environmental Monitoring Programme, involving
an estimated expenditure of $48,775.61, be approved; and
That the firm of Proctor and Redfern be retained as the programme
consultant.
!l The staff be directed to construct and place a test section of
floating tire breakwater, approximately 25 feet wide and 200 feet
long, in the area of Crescentwood Road in the Borough of Scarborough,
at an estimated cost of $20,000.00.
CARRIED;
13. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT: 1979-1981
Humber River at Oak Ridges - Preliminary Engineering Study
-Extra Work Order
A staff communication was presented advising that additional soils
information is required in order to analyze the possibility of filling
the marsh areas and its effects on flood levels.
Res. 198 Moved by: Dr. T.H. Leith
Seconded ~y: C.F. Kline
RESOLVED THAT: The proposal received from the ~irm M.M. Dillon Limited
to carry out additional soils and hydraulic analyses required on the
Humber River at Oak Ridges, in the amount .of $2,500.00, be approved.
CARRIED;
B-66 -8-
14. INTERIM WATER AND RELATED LAND MANAGEMENT PLAN
-Proposal for Flood Damage Analyses and
Alternative Remedial Works
A staff communication was presented advising that the next and last stage
of background data analysis, having regard to the above, is to determine
the number of existing flood-vulnerable areas, using the new flood lines,
the extent of their vulnerability and to then determine alternative
measures for their protection.
A proposal has been obtained from James F. MacLaren Limited for this work,
in the amount of $86,100.00.
Res. 199 Moved by: Mrs. J.A. Gardner
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The firm James F. ~1acLaren Limited be retained to carry
out a "Flood Damage Analyses and Alternative Remedial Works" study, in the
amount of $86,100.00.
CARRIED;
15. QUOTATION '79-19
-Claireville Conservation Area
Visitor Service ?rogrammes:
Canoe Trailer
A staff communication was presented advising that in the development of
the Small Craft Programme for the Visitor Service Programmes in the
Claireville Conservation Area this summer, a trailer will be required to
transport up to eight canoes at a time, together with the lifejackets,
paddles and associated equipment necessary to the programme.
Res. UOO Moved by: Mrs. F. Gell
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The purchase of one canoe trailer from J. Ardill for the
Small Craft visitor Service Programme at the Claireville Conservation Area,
in the sum of $650.00, be approved.
CARRIED;
16. ONTARIO SKI RESORTS ASSOCIATION ANNUAL CONVENTION:
MAY 7-9, 1979, CONSTELLATION HOTEL, TORONTO
-Attendance at
A staff communication was presented, advising that the Ontario Ski Resorts
Association - through which skiing conditions and facilities are reported
through the news media - is having its annual convention May 7-9, 1979. A
number of agenda items will be of value to the operation of the Authority's
ski programmes, including advertisement, promotion, rental shOp operation
and discussions on cross-country, skiing programmes, education programmes
and the snow reporting system. The Authority is a member of the
Association.
Res. UOl Moved by: E.H. Card
Seconded by: C.F. Kli,ne
RESOLVED THAT: Mr. Andy Wickens, Recreation Programmes Supervisor, be
authorized to attend the Ontario Ski Resorts Association Convention ~t the
Constellation Hotel, Toronto, May 7-9, 1979, and that his expenses, in the
amount of $42.00, be paid.
CARRIED;
17. URBAN DRAINAGE MANAGEMENT IN ONTARIO
-Report of the Urban Drainage Policy Committee
A staff communication was presented advising that the Chairman is in receipt
of the above-mentioned report from the Co-Chairman of the Committee.
Res. 1102 Moved by: M.W.H. Biggar
Seconded by: Dr. T.H.Leith
-9- B-67
RESOLVED THAT: The staff communication, together with summary of the
Report of the Urban Drainage Policy Committee, be received; and
THAT the Urban Drainage Policy Committee be advised that:
(a) The Authority is in receipt of the report of the Urban Drainage
POlicy Committee and that the Authority supports the principles
contained therein;
(b) The Authority recognizes the key role which it can play, together
with its municipalities, in drainage planning and is in the final
stage of preparing a Watershed Plan which will provide drainage
guidelines for this region;
(c) The staff has been requested.to meet with the Committee to discuss
the most appropriate means of expediting implementation of those
policies with which the Authority is concerned.
CARRIED;
18. LAKE ST. GEORGE CONSERVATION FIELD CENTRE:
-Quotations for Septic Tank System
A staff communication was presented advising that the following quotations
have been received for two septic tanks required for the Lake St. George
Conservation Field Centre. Both systems contain 2,000 gallon tanks, the
one for the dining area having 800 lineal feet of tile, and the one for the
dormitory having 600 feet of tile.
eontractor Total Amount
George Harding $10,289.00
Albert Grigsby $10,200.00
Harry Smith 9,320.00
Len Robinson No Bid
Res. n03 Moved by: E.H. Card
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The quotation of Harry Smith for the installation of the
septic system at the Lake St. George Conservation Field Centre, in the
sum of $9,320.00, be accepted; it being the lowest quotation received.
CARRIED;
19. FINERY INVESTMENTS LIMITED
-Reconveyance of Land
Res. U04 Moved by: J.S. Scott
Seconded by: C.F. Kline
WHEREAS as part of the approval process of .the Subdivision ,
Development Plan M-25l, approved in 1978 for the City of Mississauga, the
following draft condition was imposed:
"14 Prior to final approval of the Plan, arrangements shall have
been made to the satisfaction of the City and The Metropolitan
Toronto and Region Conservation Authority regarding the future
disposition of Block "C".
WHEREAS on 23rd March, 1978, Finery executed a transfer of all of Block "C",
Plan M-25l, City of Mississauga, for a nominal consideration to the
Authority. Finery apparently having executed the deed on advice from the
City and/or Finery's consultants that the Authority would not release the
draft plan without a conveyance to it of Block "C". This being a wholly
mistaken view by Finery as to the Authority's requirement. ~
WHEREAS on 25th April, 1978, the Planning D~partment of the City of
Mississauga wrote to the Authority and, after having made reference to the
aforementioned draft condition, sought from the Authority "a statement as
to the anticipated long term use of Block "c" in accordance with the
Authority's interest in the property."
B-68 -10-
WHEREAS on 2nd ley, 1978, the Authority replied that the "property does
not fall within any current pcquisition plans of this Authority", and on
31st May again communicated with the City, this time indicating that the
Authority "would have no objection to condition No. 14 of the Minister's
conditions of the final approval dated 14th March; 1977, being deleted."
WHEREAS on 24th November, 1978, the transfer of Block "C", Plan M-25l,
City of Mississauga to the Authority by Finery for a nominal consideration
was registered on title by the City of Mississauga allegedly on behalf of
the Authority but, without any express or implied authority to so do.
AND WHEREAS based on the facts and on an opinion provided to the Authority
by its solicitor, Mr. John B. Conlin, Q.C., to the effect that the
registration of the transfer was made in error.
THEREFORE BE IT RESOLVED that Block "C", Plan M-25l, City of
Mississauga, be forthwith reconveyed to Finery Investments Limited;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to execute such documents as required to give effect thereto.
CARRIED;
20. HALF WAY HOUSE DINING ROOM
-Dishes and Glassware
-
A staff communication was presented advising that dishes and glassware are
required for the dining room operation at the Half Way House, Black Creek
Pioneer Village,.
Motion Moved by: C.F. Kline
Seconded by: J.S. Scott
; RESOLVED THAT: Dishes and glassware be purchased Ior the Half Way House
dining room from the Royal Doulton Group at a price not to exceed
$3,200.00, excluding taXi and
THAT the purchase be ;unded from the Food Services Equipment Reserve
Account. ' . .
THE MOTION WAS-----------------------------------------------NOT CARRIED;
Amendment Moved by: lM.W.B. Biggar
Seconded by: E.V. Xolb
RESOLVED THAT: Dishes and glassware be purchased for the Half Way House
dining room from the Royal Doulton Group at a price not to exceed
$3,200.00, excluding taXi and
THAT the purchase be funded from the Black Creek Pioneer Village Operations
and Maintenance Budget.
THE AMENDMENT WAS--------------------------------------------NOT CARRIED;
Res. nos Moved by: . Rrs. F. Gell
Seconded by: E.H. Card
RESOLVED THAT: The Administrator of the Historical Sites Division be
requested to review the report and recommendations regarding the purchase
of dishes and glassware for Half Way House and ,submit a ,further report to
the next meeting of the Executive Committee1 and
THAT samples of dishes and glassware be made available for inspection by
the Committee.
CARRIED;
NEW BUSINESS
21. 1979 YORK COUNTY SCIENCE FAIR
MRS. HANCEY advised the members that she had represented the Authority at
the 1979 York County Science Fair on April 7, 1979.
.
.
:
."
-11- B-69
Res. 1106 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Authority provide complimentary Season's Passes to
the winners in the Conservation category at the 1979 York County Science
Fai~, held Saturday, April 7, 1979.
CARRIED;
22. EXECUTIVE COMMITTEE MEtTING '5/79
.."
The Secretary-Treasurer advised the Committee that the next regular
meeting is scheduled for Wednesday, April 25, 1979, and will be held at
this office. Lunch will be served at the Kortright Centre for Conservation,
to be followed by a meeting with The Regional Municipality of York.
23. ADJOURNMENT
On Motion, the Meeting adjourned at 1:05 p.m., April 11.
,
.J
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
B-70 SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PERSONNEL SUB-COMMITTEE
REPORT /11 /7,9
The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive,
DOWNSVIEW, Ontario on Thursday, March 29, 1979, commencing at 10:00 a.m.
PRESENT WERE
Chairman Mrs. L. Hancey
Members E. V. Ko1b
Dr. T. H. Leith
Authority Chairman R. G. Henderson
Authority Vice-Chairman Mrs. F. Gell
Secretary-Treasurer K. G. Higgs
Director, Planning & Policy Staff W. A. McLean
Administrator, Finance Division A. D. Harris
ABSENT MEMBERS
Members M. J. Breen
Mt"s. S. Martin
THE FOLLOWING ITEMS WERE DISCUSSED:-
1) Appointments, Transfers and/or Promotions to the Full Time and
Full Time Probationary Staff;
2) Finance Division - Classification Level Changes;
3) Memberships in Organizations, Publications, Conferences, Conventions
Seminars and Training Courses;
4) In-Service Training Course - Information and Education Division;
5) Responsibilities - Director of Planning and Policy;
6) Moving Expenses.
IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS:-
1) APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS TO
THE FULL TIME AND FULL TIME PROBATIONARY STAFF
THAT the following appointments, transfers and/or promotions be made
to the Full Time and Full Time Probationary Staff:- .
a) Appointments to the Full Time Staff
Name Position Effective Date
P. Garland Livestock Man, B.C.P.V. No-vember 26/78
V. ~erry Clerk Typist February 4/79
M. Miller Accounting Assistant February 4/79
T. Hay Assistant Gardener, B.C.P.V. January 21/79
w. S. Kerr Labourer February 19/79
b) Appointments to the Full Time Probationary Staff
Name Position Effective Date
M. E. Miller Accounting Clerk December 11/78
L. M. Bryla Secretary January 15/79
A. M. Morris Secretary March 5/79
J. A. Silk Secretary December 11/78
A. Hayton Project Biologist February 26/79
J. Haggart Clerk Typist April 2/79
L. Wilson Building Manager I March 27/79
(Albion Hills)
B-71
Report fll/79 Page 12
Personnel Sub-Committee
APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS TO
THE FULL TIME AND FULL TIME PROBATIONARY STAFF (continued)
c) Promotions within the Full Time Staff
Name Position Effective Date
A. Vernest Works Superintendent, February 26/79
Lake St. George February 5/79
M. Dziedzic Senior Secretary
D. Osborne Supervisor, Property Management February 5/79
M. Giffin Assistant Works Superintendent January 29/79
D. Hebert Building Manager II March 19/79
d) Transfers within the Full Time Staff
Name Position Effective Date
J. Wansbrough Cons. Education Supervisor, September 1/79
Albion Hills
2) FINANCE DIVISION,
CLASSIFICATION LEVEL CHANGES
THAT the positions of Accounting Assistant (General) and Accounting
Assistant. (Payables) of the Finance Division be upgraded from
Cl~ssification Level 2 to Classification Level 3 and that the
Personnel Manual be amended accordingly.
3) MEMBERSHIPS IN ORGANIZATIONS, PUBLICATIONS,
CONFERENCES, SEMINARS AND TRAINING COURSES
THAT the Association and/or Society Memberships, publications, con-
ferences, conventions and seminars, attached to this Report as
Appendix I, be authorized for 1979 and that the estimated fees,
listed as follows, be paid:-
Memberships ........................ $ 3,156.25
Publications ....................... 690.00
Conferences ........................ 11,752.00
Total Estimated Cost for 1979 $ 15,598.25
4) IN-SERVICE TRAINING COURSE -
INFORMATION & EDUCATION DIVISION
THAT Ms. Mercedes Ruano be authorized to attend the courses:
Introduction to Computers and Introduction to Management Accounting
during the next Autumn/Winter term and that the fees in the amount
of $240.00 be paid.
5) RESPONSIBILITIES -
DIRECTOR OF PLANNING & POLICY
THAT the Report re Responsibilities - Director of Planning & Policy
together with the recommendations therein, attached to this Report
as Appendix II, be approved for inclusion in the Personnel Manual.
B-72
Report ~ll/79
Personnel Sub-Committee Page 13
~) MOVING EXPENSES
THAT the policy with regard to Authority requested moving expenses,
attached to this ReP9rt as Appendix III, be approved fo~ inclusion
in the Personnel Man4al. . ,
Mrs. L. Hancey, Chairman K. G. H~ggs, Secretary-Trea~urer
:wr
1979.0.3.30.,
B-73
APPENDIX 1
TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A.
Meeting '1/79 - Thursday, March 29, 1979
RE: MEMBERSIIIPS IN ORGANIZATIONS AND PUBLICATIONS, CONFERENCES, SEMINARS AND
TRAINING COURSES
11 IS RECO~~ENDED T.~T the following Association and/or Society Memberships and
publications, conferences, conventions and seminars be authorized for 1979 and that
the fees in connection therewith be paid:-
\
1) MEMBERSIIIPS IN ORGANIZATIONS (Total Estimated Cost $3,156.25)
,
Executive and Senior Staff
Executive and Senior Staff . Soil Conservation Society of America
Corporate Membership . Metropolitan Toronto Board of Trade
Finance Division
A. D. Harris . Municipal Finance Officers Association
C. A. Francis . The Society of Management Accountants of Canada
c. A. Francis . Financial Management Association
Property & Administration
W. E. Jones . Right-of-Way Association
D. J. Princ'e . Appraisal Institute of Canada
-..-. Information & Education
....."......
"
T. E. Barber . Convention & Tourist Bureau
" . American Association for Cons. Information
,
. Cons. Education Association
. Field Studies Council
K. W. Strasser . Federation of Ontario Naturalists
. Canadian Nature Federation
A. Foster . Interpretation Canada
T. Carr . Federation of Ontario Naturalists
. Outdoor Canada
. The Archaeological Society of Ontario
. Canadian Nature Federation
. Council of Outdoor Educators of Ontario
A. Hayhoe . Early American Industries
. Ontario Museum Association
R. Hudson . Council of Outdoor Educators of Ontario
. Federation of Ontario Naturalists
. National Science Teachers Association
. Canadian Wildlife Federation
J. Wansbrough . Council of Outdoor Educators of Ontario
. Federation of Ontario Naturalists
. Canadian Nature Federation
. Ontario Camping Association
Historical Sites .
R. K. Cooper . Living Historical Farms & Agriculture Museums
. Early American Industries Association
. Ontario Historical Society
. The Assoc. for Preservation.Technology
. York Pioneer & Historical Society
. Pennsylvania German Folklore Society of Ont.
. National Assoc. of Watch & ,Clock Collectors
. Chapter 33 National Assoc. of Watch & Clock Collectors
. Artist-Blacksmith Assoc. of North America
. Canadian Guild of Antique Arms Collection
. Canadian Museum Association
.'Society for the Preservation of Old Mills
. Canadian Centre for Folk Culture Studies
. Rushlight Club
. .Ontario Museum Assoc.
" 'I',: .,,; :.'.'..:.'~' ::
,B-74 '
Personnel Sub-Committee
Meeting 111/79
Memberships. Publications.. CO'1ferences. Conventions & Seminars Page 112
MEMBERSHIPS IN ORGANIZATIONS (continued)
Historical Sites (continued)
J. M. Hughes. . Ontario Museum ~ssoc.
. Costume Society for Ontario
L. S. O'Byrne . Ontario Museum Assoc.
F. Castle , ' . Ontario Museum Assoc.
. ,
. , .
Conservation'Land Management
J. Agnew.,M;,MacDowell,
A. Ceney.'... ';'." . Ontario Maple Syrup Producers Assoc.
J. Agne~, 'S'~,:'.Bont'j-e ',., . ,Ontario Parks Assoc.
J. Agnew, D. Dyce."E; Oakleaf. Ministry of Environmen~ (Pesticide Licence)
P. Flood '. ,., . National & Provincial Parks Assoc.
. Canadian Land Reclamation Assoc.
. Canadian Parks/Recreation Assoc.
D. Dyce . Ontario Shade Tree Council
E. Oakleaf . Ontario Shade Tree Council
. Canadian Nature Federation
A. Freeman . Federation of Ontario Naturalists
. Soil Conservation Society of America
Water Resourc~,' .DiVi s ion
.,':p.: '""
M. R. Garrett'" " .. American Society for Civil Engineers
I. . International Assoc, for Great Lakes Research
. , . The Canadian Society for Civil Engineers
. American Public Works Assoc.
J. C. Mather . Canadian Water Resources Assoc.
. American Public Works Assoc.
B. E. Denney . International Assoc, for Great Lakes Research
. American Pub 1 ic Works Assoc,'
A. G. Sahabandu . The Soil Conservation Society of America
w. ~. Mulholland . Ontario Parks Assoc.
R. W., Dewell, . Canadian Land Reclamation Assoc.
R. Saadia .. . The Soil Conservation Society of America
J. D. Tucker . The Soil Conservation Society of America
'T. E. Farrell . Can~ian Parks/Recreation Assoc.
. American Institute of Planners
Planning & Policy Staff
W. A. McLean . Canadian Parks Assoc.
J. W..Maletich . American Planning Assoc.
A. C. Deans . Soil Cons, Society of America
2) PUBLICATIONS (Total Estimated Cost $690.00)
Property 6 Administration
Secretaries in All Divisions . Canadian Secretary Magazine
Historical .Sites.Division
R. IC.' Coopel '. . ' . Pennsylvania Folklife
" . Ant iques
. The Canadian Collector
.. Ontario Showcase
. The Auctioneer
. The Canadian Journal Arms Collection
" . Iron Horse Antiques Inc.
B-75
Personnel Sub-Committee
Meeting 111/79
Memberships. Publications. Conferences. Conventions & Seminars Page '3
PUBLICATIONS (continued)
Information & Education
D. deVerteuil . Photo Life
. Petersen Photographic
. Canadian Kodak Company
. Popular Photography
. Photo Canada
. Canadian Photography
IC. W. Strasser . National Audubon Society
. Harrowsmith ~agazine
A. Foster . The Chickadee
. Gleamings in Bee Culture
. The New York Conservationist
. Scientific American
. The Owl
T. Carr . Canadian Geographic Journal
. Ontario Field Biologist
. Volunteer
. The Bulletin
. New York Conservationist
. National Audubon
. Harrowsmith Magazine
A. Hayhoe . Harrowsmith Magazine
. Early American Life
R. Hudson . The Owl
. The Ontario Milk Producer
. The Ranger Rick
. The New York Conservationist
P. Head . Marketing Magazine
J. Wansbrough . The Owl
. Harrowsmith Magazine
. The New York Conservationist
. Canadian Geographical Journal
Conservation Land Management
S. Bontje . Foremanship (distribution to all work centres)
A. Freeman . Demographic Bulletin
P. Flood . Foundation for Aggregate Studies
A. Wickens . Directory of Community Services
3. CONFERENCES, TRAINING COURSES AND SEMINARS (Total Estimated Cost $11.752.00)
Authority Members & Senior Staff
IC. G. Higgs . S.C.S.A. Annual Meeting. Ottawa. July 29/79
Authority Members and Senior ,
Staff . Conservation Authorities Tour - Sept. 30/79 ~ Oct. 3/79
Property & Administration
W. E. Jones . Right-of-Way Seminar - Toronto. June/79
D. J. Prince . Appraisal Institute of Canada - Toronto. May/79
Historical Sites
R. ~. Cooper . Ontario Museum Assoc. - Barrie. October/79
J. M. Hughes . Ontario ~fuseum Assoc.' - Barrie. October/79
L. O'Byrne . Ontario Museum Assoc. - Barrie, October/79
F. Castle . Ontario Museum Assoc. - Barrie. October/79
B-76
Personnel Sub-Committee
Meeting 111/79
Memberships, Publications, Conferences, Conventions & Seminars Page '4
CONFERENCES, TRAINING COURSES AND SEMINARS (continued)
Information & Education
T. E. Barber . Study Tour of ' Nature Centres, Washington, D.C.
Fall of 1979
T. Carr . Residential Outdoor Education Workshop, Boyne River,
April 6-8/79
. S.C.S.A. Annual Meeting, Ottawa - July 27-30/79
. The Council of Outdoor Educators of Ontario
October/79
A. Hayhoe . Ontario ~fuseum Assoc. - Barrie, October/79
A. Foster . Interpretation Canada - Vancouver - October/79
R. Hudson . Ontario Camping Assoc. - Boyne River, April 6-8/79
. Exchange Program with Leslie Frost Centre, Dorset
Conservation Land Management
D. Dyce, E. Oakleaf . Ontario Shade Tree Council, October 17-19/79
A. Freeman . Recreation Resource Planning & Design Institute
Michigan State U. - April 22-25/79
D. Dyce, E. ,Oakleaf,
S. Bontje . Effective Superivision - Human Relations Course
Humber College - March 20 - April 12/79
J. Agnew, S. Bontje . Ontario Parks Annual Conference - Thunder Bay
August 2-4/79
J. Agnew, M. MacDowell,
A. Ceney . Maple Syrup Producer's Association
1) Information Day - Elmvale - January 19/79
2) Summer Tour - Kemptville, July/79
3) Annual Meeting - Dorset, October 26-27/79
20 C.L.M.D. Supervisory Staff. Ontario Conservation Authorities Supervisors
Workshop - St. Thomas - September 18-20/79
P. Flood . Canadian Parks/Recreation Assoc. Annual Meeting
Windsor - August l2-~6/79
Water Resource Division
J. C. Mather . Fourth National Hydrotechnical Conference -
Vapcouver
A. G. Sahabandu . Urban Drainage II - Vancouver
T. E. Farrell . Fourth National Hydrotechnical Converence -
Vancouver
Planning & Policy Staff
w. A. McLean . Canadian Parks Assoc. - Windsor
A. C. Deans . Soil Cons. Society of America - Ottawa
NOTE: Authority Members attendance at Conferences,
Conventions, Training Courses and Seminars
In accordance with Ontario Municipal Board Order #R.4873/7l, members of
the Authority may attend conferences, conventions, training courses .nd
seminars and their actual costs involved are covered by the Authority
when said costs are necessarily occurred in the conducting of the busi-
t ness of the AuthoritY1 under the direction of the Executive Committee.
:wr
1979.03.20.
8-77
APPENDIX II
TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A.
Meeting il/79 - March 29, 1979
RE: RESPONSIBILITIES - DIRECTOR OF PLANNING AND POLICY
The Secretary-Treasurer is the chief adminis'~rative officer of the Authority
responsible to the Executive Committee for the management of the Authority's
work. The Director of Planning and Policy is responsible to the Secretary-
Treasurer for the coordination of planning and for program and project
development. He has been assisting in the day to day administration of the
resource management divisions - Water Resource, Conservation Land Management,
Historical Sites and Information and Education.
I ,
I propose to include in the Director of Planning and Policy's responsibilities
the administration of the resource management divisions. This modification
will clarify lines of responsibility, and will assist in creating, among those
divisions, a coordinated and cohesive unit for our resource management work.
This proposal can,be effected by amending the Personnel Manual of the Authority
to reflect the following structure:
~I
DIRECTOR OF
PLANNING AND POLICY
FINANCE PROPERTY CONSERVATION WATER INFORMATION HISTORICAL
AND LAND 'RESOURCES AND SITES
ADMIN. MANAGEMENT EDUCATION
RECOMMENDATION:
IT IS RECOMMENDED THAT the Personnel Manual be amended to provide as follows:
SECTION I - SENIOR STAFF
add position description Director of Planning and Policy
POSITION: Planning and Policy Director
CLASS. LEVEL: 11
TERMS OF REFERENCE
The Director of Planning and Policy, in the absence of the Secretary-
Treasurer, shall assume all of the responsibilities of the Secretary-
, Treasurer and be a signing officer of the Authority. .
The Director of Planning and Policy is responsible to the Secretary-
Treasurer for the administration of planning coordination, project and
program development and operations of the resource management divisions -
Water Resource, Conservation Land Management, Historical Sites, Information
and Education, and the Development Control Staff.
QUALIFICATIONS & EXPERIENCE .
- a thorough knowledge of administrative practices and procedures
- a thorough knowledge of resource management planning techniq~es,
practices and procedures .
- a thorough knowledge of provincial and municipal government affairs
- ability to coordinate inter-divisional staff activities
- a thorough knowledge of conservation
B-78
Personnel Sub-Committee
Meeting #1/79
Responsibilities - Director of Planning and policy Page 2
SECTION J - PLANNING AND POLICY STAFF
Page J-l to read:
Function of Development Control Staff
The Development Control Staff is responsible to the Director of Planning
and Policy for the review and preparation of Authority comments on
development proposals, the plans and policies of other levels of
government, .and for the administration of Regulations made under The
Conservation Authorities Act for fill, construction and alteration to
waterways.
The lines of responsibility of each of the following personnel
descriptions are set out in the Development Control Staff organization
chart.
Page J-2 title to read - Development Control Staff
_ Staff Committee on Planning and Policy to
read:
Director of Planning and Policy
Secretary-Treasurer
Division Administrators
Support staff as required.
Page J-3 - Delete
.
Pages M-3, N-3, 0-3, P-3 to read:
Terms of Reference
To be responsible to the Director of Planning and Policy for the
administration of the ...............Division.
K. G. Higgs
Secretary-Treasurer
XGH/mm
1979.03.20.
.
APpJlNDIX 'II B-79
~ the metr9Politan toronto and region conservation authority . PAGE: B-15
Personnel .Manual EXEQJTIVE Nt
(p Employee Policies and Regulations DATE:
..
Authority Requested - Moving Expenses RESOLUTION Nt
When an employee is transferred at the request of the Authority,
he/she shall be eligible for the re-imbursement of the relocation
expenses which are actually incurred, subject to the conditions
and limits outlined below:-
/' \
1) The employee is being transferred from a position requiring
an Authority residence to a position also requiring an Authority
residence.
2) The foll~wing expenses are permissible in connection with the
transport of household effects:-
, ..
- the cost of crating, packing, unpacking, cartage and
reasonable insurance against breakage, loss in transit
etc.. .
NOTE: To avoid any misunderstanding about pick-up, delivery,
payment of invoices etc..., instructions to the mover
should be detailed in writing o~ an Authority purchase
order and acknowledged by the movers. Movers' invoices
~st be approved by the Administrator of the Division
responsible and shoul~ be paid by the Authority
directly. '
,
, '
\ .
,
B-80 SCHEDULE "B~
THE METROPOLITAN TORONTO AND REGlqN CONSERVATION'AUTHORITY
Report il/79 April 2, 1979
~cognition Committee Meeting 12:30 p.m.
The Recognition Committee met at the Authority Office, 5 Shoreham Drive
(Humber Room), Downsview, on Monday, April 2,1979, commencing at 12:30 p.m.
PRESENT WERE: Mrs. E. Gardner Chairman
F. R. Perkins Member
M. M. R. Stewart Member
W. A. McLean MTRCA staff
P. Head
M. Ruano
The following matters were considered:
(1) Nominations - 1979 Honour Roll Awards
(2) Program - 1979 Honour Roll Awards
(3) Program - Service Recognition Awards
(4) Recognition poiicy ..
IT WAS AGREED AND THE CO~1MI~TEE RECOr::NDS:
1. Nominations.- 1979 Honour Roll Aw rds
THAT the fol~owing people be nominated to receive an Honour Roll Award in
197~,:
The Hon. James Auld
Mr. Jesse Bryson
Mr. George Dyce
Dr. G. Ross Lord
Mr. Fred Lurin
Mr. Preston Sewell
Mr. John Weir (deceased)
2. Program - 1979 Honour Roll Award presentation
, .
THAT the following changes be made in the format of the tree planti~g ~ny,:
(a) FOl19win9 the presentation,~f all awards and brief response from
recipients, the trees be planted simultaneously;,
(b) Guidelines for presentors and recipients be prepared, recomme~ding
brief remarks;
,
(c) The "T~ee Bees" be invited to participate in the pr~gram in
rec~gnition of the International Year of the Child;
\
(d) The ~ate of the ceremony be set in May, at a time convenient to
the Hon. James Auld, if possible.
3. Program - Service Recognition Awards
THAT the following members receive Lifetime Passes:
Mr. Michael W. H. Biggar (1974-1978)
Mr. Emil V. Kolb (1974-1978)
Mr. Gordon F. R. Norton (1974-1978)
THAT the following receive Gold Recognition Awards:
Mr. Frank McKecpnie (1958-1978)
~HAT Mr. Willi~ Davidson, Q.C. recei~e a GOld Recognition Award this year,
AND FURTHER THAT the Service Recognition Awards be pre~ented at the annual
Spring Garden Party, in conjunction with the opening of the Sawyer's H~use
at the Black Creek Pioneer Vill~ge~
...2... "
- 2 - B-8l
Report il/79 April 2, 1979
Recognition Committee Meeting 12:30 p.m.
4. Other Business
THAT the Service Recognition Award Policy be amended to delete the stated
times and locations of the presentation of the awards, in order to afford
more flexibility.
Mrs. Edna Gardner Mercedes Ruano
Committee Chairman Secretary
WAWmrp
1979.04.05
!I
~
, B-82
the metropolitan toronto and region conservation authority
minutes Report '5/7~
-- ----------
EXECUTIVE COMMITTEE WEDNESDAY-APRIL-25-l979 15/79
--- -- - --- ------------
The Executive Committee met in the Board Room, Authority Office~ 5 Shoreham
Drive, Downsview, on Wednesday, April 25, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members W.G. Barber
M.W.H. Biggar
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Research' Planner, Planning & Policy Mrs. A.C. Deans
Development Co-ordinator, Planning ,& Policy J.W. Maletich.
Planning Technician, Planning & ~olicy Miss A. Aitkel\
Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau
Project Engineer-Dev.,Flood Control Section, WRD A.G. Sahabandu,
, HEARING
Following the Roll Call, the Meeting' recessed to hold a Hearinq reI
O.T. Baggio & Associates Limited -on behalf of-
Reuben Parnes
Town of Markham
Rouge River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
, ,Members W.G. Barber
M.W.H. Biqgar
B.H. Card
Mrs. J .A. Gardner
Mrs. L. Hancey
c.r. Kline
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
.birector of Planning & Policy W.A. McLean
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Diyision P.B. Flood
Adm. - Water Resource Division .M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Executive Secretary Mrs. K. Conron
Research Planner, Planning & Policy Mrs. A.C. Deans
Head, Waterfront Section, Water Resource Divn. B.E. Denney
Development Co-ordinator, Planning & Policy J.W. Maletich
B-83 -2-
Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau
Supervisor, Property Administration, P&AD D.J. Prince
Project Eng~neer-Dev.,Flood Cont. Section, WRD A.G. Sahabandu
ABSENT WERE
Members M.J. Breen (Jury Duty)
E.V. Kolb
Mrs. S. Martin
MINUTES
The Minutes of Meeting '4/79 were presented.
Res. n07 Moved by: E.H. Card
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Minutes of Meeting '4/79, as presented, be adopted as if
read. CARRIED,
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY
SECTION II
I
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE CO~TTEE:
1. STAFF FINANCIAL PROGRESS REPORT
-January 1 to March 31, 1979
The staff presented a Financial Progress Report for the period January 1
to March 31, 1979.
Res. 1108 Moved by: Mrs. F. Gell
Seconded by: E.H. Card ;
RESOLVED THAT: The Staff Financial Progress Report for the period
January 1 to March 31, 1979, be received and appended as Schedu~e "A" of
these Minutes.
CARRIED,
DR. LEITH advised the members that a letter has been received from CSCS';''l'V
stating t~~t Channel Eleven is pleased to have donated air time during the
months Jun~-October and December 1978 to the value of $42,200:00 on behalf
of the AuthC?:dty.
2. THE CHAIRMEN'S COMMITTEE OF THE
ONTARIO CONSERVATION AUTHORITIES
-Proposed Expansion of Chairmen's
Committee Office
At the request'of the Chairman, the Executive Committee considered the
proposal of The Chairmen's Committee of the'Ontario Conservation
Authorities regarding the proposed expansion of the Chairmen's ,Committee
office by the 'engaging of a full~time Secretary-Manager/Executive-Secretary.
The Executive Committee reviewed the proposed ~erms of Reference for a
full-time Secr~tary-Manager/Executive-Secretary.and the estimated cost of
the expanded operations, together with the proposed levy on The
Metropolitan Toronto and ~e~ion Conserv~tion Authority.
Considerable d~scussion took place with respect to this proposal.
-3- B-84
Res. fl09 Moved by: J.S. Scott
Seconded by: C. F. Kline
WHEREAS The Metropolitan Toronto and Region Conservation Authority
supports The Chairmen's Committee of the Ontario Conservation Authorities,
and the role and function that the Committee presently performs in
presenting a common viewpoint to the Government of the Pr~vince of Ontario
in matters affecting conservation authoritiesJ
AND WHEREAS there are, within the conservation authorities of Ontario,
substantial staff resources to provide the necessary background
information and analysis which reflect the concerns of individual
authorities and groups of authorities which it would be difficult for
staff of the Chairmen's Committee to provide;
AND WHEREAS the Authority is of the op~nion that matters of policy affect-
ing individual authorities or groups of authorities are the responsibility
of such authorities or groups of authorities;
THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region
Conservation Authority advise The Chairmen's Committee of the Ontario
Conservation Authorities that it does not support the proposal to engage
a full-time Secretary-Manager/Executive-Secretary on the basis set out in
the proposal received under date of April 5, 1979;
AND BE IT FURTHER RESOLVED THAT The Authority would not support the pro-
posed levy to finance the expansion of the Chairmen's Committee office.
CARRIED,
3. OUOTATION i79-0l r
Petticoat Creek Conservation Area
-Picnic Table Material
A staff communication was presented advising that the following quotations
have been received for the supply and delivery of material for the con-
struction of picnic tables at the Petticoat Creek Conservation Area:
Card Lumber $1,802.74
Cadillac Building Products 1,814.29
Oriole Lumber Limited 1,914.25
Hanford Lumber 1,9~0"30
The above prices include Federal and
Provincial sales taxes.
Res. 1110 Moved by: C.!'. Kline,
Seconded by: Mrs. J .A. Gardner
RESOLVED THAT: The quotation received from Card Lumber for the supply and
delivery of picnic table material for th~ Petticoat ,Creek Conservation
Area, in the sum of $1,802.74, be accepted, it being the lowest quotation
received.
CARRIED,
4. QUOTATION t79-0lA
Petticoat Creek Conservation Area
-Picnic Table Frames
A staff communication was presented advising that the following quotations
have been received for the supply and delivery of 90 steel frames for the
construction of picnic tables at the Petticoat Creek Conservation Area:
Muskoka Docks Limited $52.97 ea.
Ressco Recreat~on Inc. 60.68 II
Henderson Recreation Equ~pment 78.11 II
The above steel frames include Federal
and Provincial sales taxes.
Res. U11 Moved by: E.H. Card
Seconded by: Mrs. L. Haneey
RESOLVED THAT: The quotation received from Muskoka Docks Limited for the
supply and delivery of 90 picnic table frames for the Petticoat Creek
Conservation Area in the sum of $52.97 each be accepted, it being the
lowest quotation received.
CARRIED,
B-85 -4-
5. QUOTATION #79-15
-5 Stihl Chain Saws
A staff communication was presented advising that the following quotation
has been received (from the 8 invitations) for the supply and delivery of
5 Stihl chain saws, with trade:
Outdoor Power Equipment $1,853.19
Res. #112 Moved by: M.W.H. Biggar
Seconded by: W.G. Barber
RESOLVED THAT: The quotation received from Outdoor Power Equipment for
the supply and delivery of 5 Stihl chain saws with trade, in the'sum of
$1,853.19, including Federal and Provincial sales taxes, be accepted.
CARRIED;
6. QUOTATION *79-18
-Rear Half of Tree Spade
A staff communication was presented advising that the following quotation
has been received for the supply and installation of rear half of tree
spade:
Vermeer of Canada Limited $6,678.27
The above price includes Federal and
Provincial sales taxes
No competitive price is available since Vermeer is the exclusive
distributor for Canada.
I
Res. 1113 Moved by: E.H. Card
Seconded, by: Dr. T.H. Leith
RESOLVED THAT: The quotation received from Vermeer of Canada Limited for
the supply and installation of the rear half of the tree spade, in the
sum of $6,678.27, be accepted. .
CARRIED;
7. ADDITIONAL PROVINCIAL CASH FLOW:
PROVINCE OF ONTARIO
-Fiscal Year 1978-l979
A staff communication was presented advising that the Ministry of Natural
Resources has advised the Authority that addi tional grant has been
approved.
Res. 1114 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey,
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority,
accept from the Ministry of Natural Resources additional ~ash flow from
1978"funding, amounting to; $165,990.00~ and ~ I
THAT budget revisions be made where necess~ry.
CARRIED,
8. EXPERIENCE '79
A staff communication was presented advising that the Authority has been
invited to participate in the Ontario Government's special summer employ-
ment programme - Experience '79, at total funding allocation of
$118,290.00.
Res. .115 Moved by': Mrs. L. Hllncey
Se~nded by: M.W.H. Biggar
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
participate in the Experience '79 Programme, within the funding established
by the Ministry of. Natural Resources, and that allocations to Divisions be
made by staff.
CARRIED,
-5- B-86
9. FINANCIAL REPORT AND ACCOUNTS
-March, 1979
Mr. Scott presented the Financial Report and Accounts for the mont~,of
Marcb, 1979.
Res. 1116 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Financial Statement for the month of March, 1979, be
received; and the Authority Accounts, in the amount of $1,330,449.00,
being (a) Current Expenditures - W~ges and Salaries $374.709.00; Materials
and Supplies $236,644.00; (b) Capital Expenditures - Wages and Salaries
$31,655.00; Materials and Supplies $687,441, be approved for paYment.
CARRIED;
10. HALF WAY HOUSE DINING ROOM
-Dishes and Glassware
A staff communication was presented havinq regard to the following
resolution adopted at Meeting '4/79 of the Executive Committee:
'Res. n05
RESOLVED THAT: The Administrator of the Historical
Sites Division be requested to review the report and
recommendations regarding the purchase of dishes
and glassware for Half Way House and submit a
further report to the next meeting of the Executive
Committee; and
THAT samples of dishes and glassware be made avail-
able for inspection by the Committee. CARRIED, ,
The staff advised that the existing dishes used in the dining room
operation at the Half Way House are not heavy duty quality and, as a
result, there has been considerable breakage. ,It is proposed to purchase
heavy duty dishes and glassware manufactured by the Royal Coulton Group.
Samples were available for inspection by Committee.
Res. 1117 Moved by: Mrs. F. Gell
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Dishes and glassware be purchased for the Half Way House
Dining Room from the Royal Coulton Group at a price 'not to exceed '
$7,500.00, excluding tax, and
THAT the purchase be funded from the Food Services. Revenue Account.
CARRIED,
11. DECISION OF HEARING
0.'1'. Baggio & Associates Limited
-on behalf of- Reuben Parnes
Town of Markham
Rouge River Watershed
Res. '118 Moved by: Mrs. F. Gell
Seconded by: .C.F. Kline
BE IT RESO.LVED THAT: This Executive Committee confirm the decision of
the .Hearing held ~is 25th day of April, 1979; and.
THAT the application of O.T. Baggio and Associates Limited on behalf of
Reuben Parnes, in accordance with Ontario Regulation 735/73, for
permission. to place ,fill and erect a dwelling within an area regulated by
this Authority on Part .of Block 'A', R.P. 6037, also described as Part
Lot 20, Concession 5,. Town of Markham (Rouge River watershed), be refQsed
for the follo~ing reason:
That the application, as submitted, will affect the conservation
of land in that it. will be necessary to undertake considerable
regrading, filling and removing existing vegeeation, which would
affect the stability of the existing valley side slopes.
CARRIED,.
B-87 -6-
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Pe Ben Pipelines Limited
To construct a storm sewer outfall into the Little
Etobicoke Creek, south of Highway #401 , east of Tomken
Road, City of Mississauga
A staff communication was presented advising that an application has been
received for a permit to construct a storm sewer outfall into the Little
Etobicoke Creek at the above location.
Res. illS Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Pe Ben Pipelines Limited, be received; and
THAT the application of Pe Ben Pipelines Limited for a permit to under-
take the construction of a storm sewer outfall into the Little Etobicoke
Creek in the area south of Highway #401, east of Tomken Road, in the City
of Mississauga (The Regional Municipality of Peel), Etobicoke Creek water-
shed, be approved, subject to:
(a) Rip rap being placed at the upstream and downstream ends of the
outfall .structure in order to protect it from further erosion;
(b) Dissipators such as shute blocks being placed at the outfall in
order to reduce the flow v~locities;
(c) A filter mat or a 6"-12" layer of crushed stone preceding all
gabion or rip rap works;
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority and' of the City of Mississauga. '.
CARRIED;
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Buttonville Golf Club
To construct an addition to existing club house, Part
Lot 14, Concession 3, Town of Markham (Rouge River
Wa tershed)
A staff communication was presented advising that an application has been
received for a permit to construct an addition to an existing club house
at the above location.
Res. 1120 Moved by: Mrs. L. Hancey
Seconded by,: M.W.H. Biggar
RESOLVED THAT: The staff communication, together with the application of
the Buttonville Golf Club, be received; and
THAT the application of the Buttonville Golf Club, in accordance with
Ontario Regulation 735/73, .for permission to construct an addition to the
existing club house within the area as defin~d in the Schedules to Ontario
Regulation 735/73, being part of Lot 14, Concession 3, TOwn of Markham
(R~uge River watershed), be approved, subject to:
(a) No bui~ding ope~ings being situated below the storm elevation line
as indicated on the plan, being 190.0 meters;
(b) The proposed berm, as indicated on the plan, being deleted from the
plan;
(c) All surplus fill being removed from the site;
(d) Every effort being made to minimize the silting of the river during
construction. '
CARRIED;
-7- B-88
14. COMMUNICATION FROM THE TOWN OF CALEDON
-Gibson Lake Property
Res. #121 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The Council of the Town of Caledon be advised that the
Authority is not prepared to enter into a Lease Agreement for the Town-
owned land which lies contiguous with Authority-owned land at Gibson Lake;
AND FURTHER THAT the TOwn of Caledon be advised of the Authority's policy
involving Acquisition of Title to Municipal and Provincial-owned lands,
and the reasons for same, and that the Town of Caledon again be requested
to convey title to the subject lands to the Authority for the nominal con-
sideration of $2.00.
CARRIED,
15. SALE OF AUTHORITY-OWNED LANDS TO
ONTARIO HYDRO
Res. #122 Moved by: J.S. Scott
Seconded by: Mrs. F. Gel!
RESOLVED THAT: The Authority convey a parcel of Authority-owned land,
being Part of Lot 23, Concession IV, and Part of the Road Allowance between
Concessions VI and VII, Town of Caledon, containing 9.388 acres, more or
less, of vacant land, situated on the east side of Highway '50, to Ontario
Hydro. Consideration to be the sum of $55,000.00, plus legal, survey, ,
appraisal and any other costs incurred in connection with the transaction.
The deed is to include a covenant to the effect that should the land, or
any portion thereof, become surplus to the requirements of Ontario Hydro,
The Metropol~tan Toronto and Region Conservation Authority is to have the
right to re-purchase; and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20(c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78, as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to sign the necessary documents to give effect thereto.
CARRIED;
16. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT - DUFFIN
CREEK WATERSHED
-Property: B. & Y. Ing
Res. t123 Moved by: M~s. F. Gall
Seconded by: E.H. Card
RESOLVED THAT: The Report (April 18, 1979) set forth herein, received
from the Property Administrator, be adopted and that the: Secretary-
Treasurer be authorized and directed to complete the transaction.
CARRIED,
liRe: Project: Interim Water,& Related Land Management
Project 1979-1981 - Flood Plain and Valley
Land Acquisition Component - Duffin Creek
Watershed
Authority: Executive Resolution..No. 133, Meeting No.4 _
April 12, 1978 and Authority Resolution No.51,
Meeting No.3 - April 21, 1978
Subject Property: South side of Main Street, west of Market Street
OWners: B. & Y. Ing
Area to be Acquired: 0'.162 acres; more or less, together with a
temporary working easement across an additional
0.056 acres, for a period of three years from
.date of closing.
Recommended $17,880.00, plus Vendors' legal costs and other
Settlement considerations, as detailed below.
-Included in the requirements for the above-noted' project is an irregular-
shaped parcel of land, being Part of Lot 35, Concession IX, Town of
Whitchurch-Stouffville, The Regional Municipality of York, being a partial
taking from a larger commercial property fronting on th~ south side of
I
I
13-89 -8-
Main Street, west of Market Street, in the downtown section of Stouffville.
In addition to the land being acquired, the Authority is also to receive a
temporary working easement for a period of three years from the date of
closing this transaction over an additional 0.056 acre portion of the
Vendors' lands for the construction of the Stouffville Channel. As a part
of this transaction, the Vendors are also to relinquish their rights
across an existing right-of-way running from the south side of l1ain Street
to the west side of their property.
"Negotiations have been conducted with the owners and their solicitor, Mr.
G.C. Ness, of the legal firm Button, Armstrong and Ness, 6 Main Street
East, Stouffville, Ontario, LOH lLO, and, subject to the approval of your
Committee, agreement has been reached with respect to a Settlement of
Compensation, as follows:
The amount of compensation is to be $17,880.00, plus Vendors' legal
costs. In addition, the Authority is to grant to the Vendors a
permanent easement ~or access purposes across a 0.026 acre parcel
of Authority-owned land, known as Part of Lot 1, Registered Plan 972,
Town of Whitchurch-Stouffville, and to arrange for the paving of same.
"I recommend approval of this transaction and that the legal firm of
Gardiner, Roberts be instructed to complete the transaction. Al!
reasonable expenses incurred incidental to the closing, for land transfer
tax, legal costs and disbursements, are to be paid. The Authori ty 'is to
receive a conveyance of the land required free from encumbrance.
liThe Administrator of the Water Resource Division has reviewed this pro-
posed acquisition and is in concurrence with my recommendation. ,
"Funds are available.
"An application has been made to the Minister of Natural Resources ~or an
Inspection Certificate."
17. REPORT 11/79 - FLOOD CONTROL AND
WATER CONSERVATION ADVISORY BOARD
Report 11/79 of the Flood Control and Water Conservation Advisory Board
was presented.
Res. 1124 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Report 11/79 of the Flood Control and Water Conservation
Advisory Board be received; and
THAT the recommendation, as contained therein and set forth 6erein, be
approved:
The Executive Committee be requested to take whatever steps are
necessary to expedite the undertaking of erosion control works
at 35 Canyon Avenue on the West Branch of the Don River;
AND FURTHER THAT the opinion of the Authority solicitor be
obtained regarding action which may be taken by the Authority,
under The Expropriations Act, to expedite expropriation of the
lands required for the works.
CARRIED,
18. INTERIM WATER & RELATED LAND ~1ANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in The Regional
Municipality of York: '-
proposeg Remedial Work -'7374 Kipling Avenue, TOwn of
Vaughan, Rainbow Creek (Humber River Watershed)
A staff communication was presented advising that remedial work is
proposed at the above location which will include realignment bf ove~
50 m of the Ra~nbow Creek, riverbank armouring and revegetation of the
embankment.
Res. 1125 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Erosion control wQrk be carried out at the rear of .7374
Kipling Avenue, Town of Vaughan (Rainbow Creek - Humber River watershed),
at an estimated cost of $16,400.00, and,
THA~ the approval of the Ministry of.Natural Resources be requested.
~RRIEDJ
-9- B-90
19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in The Regional
Municipality of York:
Proposed Remedial Work - 7440 Kipling Avenue, Town of
Vaughan, Rainbow Creek (Humber River Watershed)
A staff communication was presented advising that remedia~ work is
proposed at the above location which will provide approximately 90 m. of
rip rap protection along the existing bank and revegetation of the embank-
ment.
Res. #126 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: Erosion control work be carried out at the rear of 17440
Kipling Avenue, Town of Vaughan (Rainbow Creek - Humber River watershed),
at an estimated cost of $14,700.00; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
20. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in Metropolitan
TOronto:
Proposed Major Remedial Work - 10 Codeco Court, City of
North York (Don River Watershed)
A staff communication was presented advising that major remedial work is
scheduled to commence this year at the above location.
Res. 1127 Moved by: Mrs. .L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Erosion control and slope stabilization work be car~ied
out at 110 Codeco Court, Borough of North York (Don River watershed), at
an estimated cost of $263,200.00; and
THAT the approval of the Ministry of Natural Resources be requested.
.- CARRIED;
2l. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in Metropolitan
TOronto:
Proposed Geotechnical Investigation of Slope Instability,
Nos. 8-14 Bruce Farm Drive, City of North York (Con River)
A staff communication was presented advising that a proposal has been
received from Golder Associates Limited, Consulting Geotechnical Enqineers,
for a Slope Instability Study at the rear of Nos.8-14 Bruce Fa~ Drive in
the City of North York.
Res. 1128 Moved by: Dr,. T.H. Leith,
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff be authorized to retain the firm of Golder
Associates Limited, Consulting Geotechnical Engineers, to carry ~ut the
geotechnical study to determine the slope instability at the rear of Nos.
8-14 Bruce Farm Drive, City of North York (Don River watershed), at a
cost estimated to be $7,100.00; and
THAT the Ministry of Natural Resources be requested to approve thi~ study.
CARRIED,
22. WATERFRONT PROJECT 1977-1981:
-Shoreline Management Programme,
Scarborough Bluffs Soils Consultant
A staff report was presented having regard to the following recommendation
of Meeting 12/78 of the Waterfront Advisory Board:
"'lHAT'the staff be directed to proceed with the preparation
of a detailed Master Plan, including enviro1'lllental assess-
uent, for the protect.i.a1 of the Scarborough shoreline by
means of a system of artificial beaches; and
'JHAT in the interim, aCXIUisitim and protection of criticial
areas continue in acx:orCarx:e with existing Authority POliey. II
B-91 -10-
Res. #129 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: Subject to the approval of the Ministry of Natural
Resources, the firm of Geocon (l975) Limited be retained tq develop
design recommendations for the alignment of shoreline prote~tion and
slope stabilization in the Crescentwood area of Scarborough, at a cost
not. to exceed $15,000.00; and
THAT the same firm be retained to undertake the first phase of the :eo-
technical investigation required for the Shoreline Management Maste Plan
at a cost not to exceed $25,000.
CARRIED;
,NEW BUSINESS
23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Kablan Construction Limited
To construct a storm sewer outfall into the Little
Etobicoke Creek, south of Eglinton Avenue, west of
Fewster Drive, City of Mississauga
A staff communication was presented advising that an application'has been
received to construct a storm sewer outfall into the Little Etobicoke
Creek at the above location.
Res. t 130 Moved by: Mrs. F. Gel!
Seconded b~: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Kablan Const~uction Limited, be received~ and
THAT the application of Kablan Construction Limited for a permit to ~der-
take the construction of a storm sewer outfall into the Little Etobi oke
Creek in the area south of Eglinton Avenue, west of Fewster Drive, City of
Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed,
be approved, subject to:
(a) Rip rap being placed on the bank of the creek surrounding the outfall
structure, and also on the creek bed in order to reduce the chances of
erosion;
(b) All areas disturbed due to construction being restored to the satis-
faction of the Authority and of the City of Mississauga; , ,
(c) The City of Mississauga Engineering Department being satisfied wi~
the proposal;
(d) Every effort being made to minimize the silting of the cr~ek durinq
construction.
CARRIED J
24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of the Environment
To install a sanitary trunk sewer crossing the West
Branch of the Don River, just north of Steeles Avenue,
east of Dufferin Street, Town of Vaughan I
A staff communication was presented advising that an application has been
received for a permit to install a sanitary sewer crossing the Don River
at the above location.. '
Res. 1131 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together ,with the application of
the Ministry of the Environment, be received; ~nd
THAT the applicati.on of the Ministry of the Environment for a permit..to
undertake the installation of a sanitary trunk sewer crossing the West
Branch of the Don River, in the area just north of Steeles Avenue, east
of Dufferin Street, Town of Vaughan (The .Regional Municipality Of York),
Don River watershed, be approved, subject to:
-11- B-92
(a) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(b) Every effort being made to minimize the silting of the river
during construction;
(c) The river configuration being maintained after construction;
(d) An easement being obtained to enter and do work on Authority-
owned lands.
CARRIED;
25. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of Transportation and Communications
To realign a section of the Black Creek between
Trethewey Drive and Eglinton Avenue to allow for
construction of the Northwest,Metro Arterial Road,
Borough of York (Humber River Watershed)
A staff communication was presented advising that a~ application has been
received for a permit to realign a section of the Black .Creek.at the above
location.
Res. #132 Moved by: Mrs. L.. Hancey
Seconded by: Mrs. F. Gell
RESOLVED THAT: The staff communication, together with the application of
The Ministry of Transportation and Communications, be received; and
THAT the application of the Ministry of Transportation and Communications
for a permit to undertake the realignment and channelization of a section
of the Black Creek between Eglinton Avenue and Trethewey Drive in o~der
to allow for the construction of the Northwest Metro Arterial ~oad, Borough
of York (Humber River watershed), be approved, subject to:
(a) The Municipality of Metropolitan Toronto Parks Department being
satisfied with the proposal;
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED,'
26. ANNUAL CONFERENCE OF THE CANADIAN MUSEUMS' ASSOCIATION:
MAY 27-JUNE 1, 1979, VANCOUVER, B.C.
-Attendance at .
A staff communication was presented advising that Mrs. Jeanne Hughes has
been elected President of the Ontario Museums' Association and has been.
asked to attend the Annual Conference of the Association to represent
Ontario at a meeting of the presidents of provincial associations. The
O.M.A. will pay Mrs. Hughes' expenses.
Res. #133 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: Mrs. Jeanne Hughes be authorized to attend the Annual
Conference of the Canadian Museums' Association to be held May 27-June 1,
1979 in Vancouver, B.C.
CARRIED,
27. THE MUNICIPALITY OF METROPOLITAN TORONTO
-Request for Sanitary. Trunk Sewer Easement:
Vicinity of Albion and Weston Roads '
A staff communication was presented advising that a request has been
received from The Mun~cipality of Metropolitan Toronto to provide a
permanent easement for. a sanitary trunk sewer in the vicinity of Albion
and Weston Roads. The proposed easement affects Authority-owned land
known as Part of Lot 155, Registered Plan M-433, Borough of Etobicoke
(The ~unicipality of Metropolitan Toronto).
Res. 113,4 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
B-93 -12-
RESOLVED THAT: A permanent easement be granted to The Municipality of
Metropolitan Toronto, required for a sanitary trunk sewer, in the
vicinity of Albion and Weston Roads. Said easement is shown as Parts 7
and 8 on Plan 66R-9963. Authority-owned land affected is Part of Lot 155,
Registered Plan M-433, Borough of Etobicoke (The Municipality of
Metropoli.tan Toronto). Said easement is to be granted for the nominal
consideration of $2.00, subject to The Municipality of Metropolitan
Toronto being responsible for carrying out and paying all legal, survey
and other costs involved in the transaction;
AND BE IT FURTHER RESOLVED THAT The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto. CARRIED;
, 28. GLEN HAFFY AND GREENWOOD CONSERVATION AREAS
-Refreshment Booth Operation
A staff communication was presented advising that in order to provide a
service for the pu~lic, individuals ,were approached in 1978 to ~dertake
the operation of refreshment booths at Glen Haffy and Greenwood
Conservation Areas. Mr. Jas. E. Maguire and Ms. Karen St. Pi#rr~
operated the facilities in 1978 and both are d~~irous of cont nuing in
1979.
Res. 1135 Moved by: W.G. Barber
Seconded by: J.S. Scott
RESOLVED THAT: Mr. Jas. E. Maguire be given the contract for the food
concession in the Glen Haffy Conservation Area for the 1979 season, and
that Mr. Magui~e keep exact costs of his operation during this period,
maintain competitive prices for his product and operate the booth on
weekends, holidays and on other occasion~ in consultation with the Super-
intendent of the Area when the public is utilizing this Area, during the
duration of the trout season; and I..
THAT Ms. Karen St. Pierre be given the contract for the food concession in
the Greenwood Conservation Area for the 1979 season, and that Ms. St.
Pierre keep exact costs of her operation during this period, maintain
competitive prices for her product and operate the booth primarily during
the months of July and August seven days a week and on weekends from Mhy
24 until Labour Day, as required, in consultation with the Superintendent
of the Area.
,CARRIJ::D,
,I
29. CANADIAN NATIONAL EXHIBITION
-Authority Participation in
Metropolitan Toronto Exhibit
A staff communication was Presented advising that a request has been
received from the Metropolitan Toronto Chairman's office for 0UthOrity
participation in the Metropolitan Toronto Exhibit at the 1979 Canadian
National Exhibition. 1,
Res. tl3~ Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Metropolitan Toronto Chairman's office be advised that
The Metropolitan Toronto and Region Conservation Author~ty will participate
in the Metropolitan Toronto Exhibit at the 1979 Canadian National
Exhibition and will contribute $5,000.00 towards the cost of the exhibit,
and
THAT the design and description of the proposed Authority exhibit,
together with suggestions for a "give..away", be submitted to the Executive
Committee prior to its inclusion in MetroShow.
CARRIED,
30. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Purchase of Aerial Photography
A staff communication was presented advising that up-to-date aerial photo-
graphy is necessary to continue the effective administration of th$
Authority's regulations and management work, and for a study in prQgress
to identify and verify environmentally sensitive areas in the urba~.
development zone and Upper Valleys of the watersheds.
-13- B-94
Res. #137 Moved by: .Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The Authority purchase from the Province of Ontaria
copies of the 1978 stereo pair aerial photography (scale 1:10,000)
covering its area of jurisdiction, at a cost not to exceed $3,500.00"
excluding Provincial Sales Tax.
CARRIED;
31. NOTICE OF MOTIONS
Mrs. F. GELL submitted the following Notice of Motions for consideration
at the next regular meeting of the Executive Committee, scheduled for
Wednesday, May 16, 1979:
U . II Moved by: Mrs. F. Gall
Seconded by: J.S. Scott
THAT the registration of Committee members
attending functional and watershed advisory
board meetings be closed 30 minutes after
the time called for the meeting."
t2 "Moved by: Mrs. F. Gall "
Seconded by: M.W.H. Biggar
!
THAT the Annual $uqaring Off function ..
sponsored by the Authority not be held in
1980; and
THAT the staff take under consideration some
oth~r type of function and report back to
the Executive Committee."
32. The Secretary-Treasurer reminded the Members that the Honour Roll Awards
ceremony will be held at the' Authority office on Tuesday, May 8, 1979,
commencing at 2:30 p.m.
33. The next regular meeting of the Executive Committee will be held on
Wednesday, May 16, 1979, commencing at 10:00 a.m. at the Authority office.
34. ADJOURNMENT
On Motion, the meeting adjourned at'12:30 p.m., April 25.
R. Grant Henderson K.G. Higgs
Chairman Secretary-T~easurer
..
B-95
SCHEDULE "A"
STAFF PROGRESS REPORT
Property Division
During the period January 1, 1979, to March 31, 1979, the
Property Division completed the purchase of 19 new properties con-
taining 228.424 acres. The Authority also completed Settlement of
Compensation on 9 properties previously expropriated. Two new
properties were expropriated durin~ the period. The total acreage
of lands owned by the Authority, as' of March 31, 1979, is 26,366.109
acres.
The Property Division also carried out all of the routine admini-
stration management required in connection with Authority owned lands,
i.e. agreements, easement~, taxes, leases, rentals, insurance, etc.
A breakdown of the properties and acreages acquired by the Authority
to date is as follows:
"
FLOOD CONTROL AND WATER CONSERVATION
ETOBICOKE CREEK WATERSHED
1 - Property settled during period containing .522 acres
- 2 properties expropriated dur~ng period containing .970 acres
- 1 purchase ~ .
Total to date--60 properties acquired containing 349.391 acres;
- 2 .expropriations outstanding
MIMICO CREEK WATERSHED
Total to date--23 properties acquirep containing 75.475 acres;
HUMBER RIVER WATERSHED
3 - Properties settled during period containing 136.676 a~res
- 3 purchases -
Total to date--723 properties acquired containing 8,256..333 acres;
- 1 expropriation outstanding ,
DON RIVER WATERSHED
6 - .Properties settled during period containing 19.828 acres
- 6 purchases
Total to date--154 properties acquired containing 1,778.259 acres,
- 3 expropriations outst~nding
HIGHLAND CREEK WATERSHED
1 - Property settled during period containing 2.110 acres
- 1 purchase
Total to date-,139 properties acquired containing 821.229 acre~;
, ,
ROUGE RIVER VALLEY WATERSHED
I
1 - Property s.ettled during period containing .~OO acres
- 1 purchase
Total to date--109 properties acquired containing 2,073.686 acres,
DUFFIN'S CREEK WATERSHED
4 - Properties settled during period containing 52.594 acres
- 4 purchas es ' .
Total to date--76 properties acquired containing 885.662 acres;
B-96
- 2 -
CONSERVATION AREAS:
- Albion Hills Conservation Area
Total in Area--34 properties containing 1,044.142 acres;
- Black Creek Conservation Area
Total in Area--7 properties containing 113.966 acres;
- Bolton Community Conservation Area
Total in Area--4 properties containing 18.043 acres;
- Boyd Conservation Area
Total in Area--12 properties containing 991.090 acres;
- Bruce's Mill Conservation Area
Total in Area--2 properties containing 267.038 acres;
- Cedar Mill Property
Total in Area--l property containing 0.337 acres;
- Claireville Conservation Area
Total in Area--l property containing 28.114 acres;
- Claremont Conservation Area
Total in Area--5 properties containing 396.750 acres;
- Cold Creek Conservation Area
Total in Area--6 properties containing 467.880 acres;
- Frenchman's Bay Conservation Area
Total in Area--9 properties containing 49.430. acres;
- Glassco Park
Total in Area--l property containing 482.000 acres;
- Glen Haffy Conservation Area
Total in Area--ll properties containing 802.206 acres;
- Greenwood Conservation Area
Total in Area--14 properties containing 680.648. acres;
- Heart Lake Conservation Area
Total in Area--8 properties containing 380.663 acres;
- Humber Trails Conservation Area
Total in Area--l property containing 48.664 acres;
- Oakbank Community Pond
Total in Area--l property containing 9.3~0 acres;
- Petticoat Creek Conservation Area
Total in Area--l property containing 177.918 acres;
B-97
- 3 -
- Lake St. George Conservation Area
Total in Area--l property containing 319.250 acres;
- Tam O'Shanter Conservation Area
Total in Area--l property containing 118.626 acres;
FOREST AND WILDLIFE AREAS:
- Gibson Lake Forest and Wildlife Area
Total in Area--l property containing 137.160 acres;
- Glen Major Forest and Wildlife Area
Total in Area--10 properties containing 1,442.057 acres;
- Goodwood Forest and Wildlife Area
Total in. Area--6 properties containing 307.639 acres;
- King Creek Forest and Wildlife Area
Total in Area--l property containing 0.185 acres;
- Palgrave Forest and Wildlife Area
1 - Property settled during period containing 15.180 acres
- 1 purchase
Total in Area--7 properties containing 628.432 acres;
- Peter Wright Forest and Wildlife Area
Total in Area--l property containing 20.939 acres;
AGREEMENT, FOREST LANDS:
- Uxbridge Forest and Wildlife Area
Total in Area--l property containing 93.000 acres;
- Humber Forest Area
Total in Area--22 properties containing 1,803.165 acres;
NIAGARA ESCARPMENT LANDS:
TOtal in Area--4 properties containing 251.926 acres;
WATERFRONT PLAN:
- Project W.F.-l - Etobicoke Sector
2 - Properties settl~d during period containing 1.314 acres
- 2 purchases
Total to date--6 properties acquired containing 68.616 acres;
- Project W.F.-2 - Ashbridge's Bay Sector
Total to date--l property acquired containing 29.618 acres;
- Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete)
Total to date--4 properties acquired .containing 0.641 acres;
B-98
- 4 -
- Project W.F.-3A - Pickering/Ajax Sector (Ext. No.1)
Total to da~e--149 properties acquired containing 491.013 acres;
- Project W.F.-4 - Scarborough Sector
9 - Properties settled during period containing \.210 acres
- 9 expropriations
Total to date--5l properties acquired containing 455.568 acres
- 1 expropriation outstanding
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION:
January 1 to March 31, 1979 - 16 properties settled containing 211.930
acres;
16 purchases
- 2 properties expropriated
Total to date--l,284 properties acquired containing 14,240.035 acres,
- 6 expropriations outstanding;
CONSERVATION AREAS:
January 1 to March 31, 1979 -
Total to date--120 properties acquired containing 6,396..115 acres;
FOREST AND WILDLIFE AREAS:
January 1 to March 31, 1979 - 1 property settled during period cont~ining
15.180 acres;
Total to date--26 properties acquired containing 2,536.412 acres;
!
AGREEMENT FOREST LANDS:
January 1 to March 31, 1979 -
Total to date--23 properties acquired containing 1,896.165 acres,
NIAGARA ESCARPMENT LANDS: ,
~
January 1 to March 31, 1979 -
Total to date--4 properties acquired containing 251.926 acres;
WATERFRONT PLAN:
January 1 ,to March 31, 1979 - 11 properties settled during period containing
3.524 acres
2 purchases
- 9 expropriations
Total to date--211 properties acquired containing 1,045.456 acres,
- 1 expropriation ou~standing;
GRAND TOTAL OF ALL PROJECTS
January 1 to March 31,1979 -'28 properties settled containing 230.634
acres;
-' 19 purchases and 9 expropriations
- 2 properties expropriated during period,
Total to date--1668 properties acquired containing 26,366.109 acres;
- 7 expropriations outstanding.
B-99
TO: The Chairman and Members of the Executive Committee, M.T~R.C.A.
Meeting '5/79 - Wednesday, April 25, 1979
RE: STAFF PROGRESS REPORT '1/79 - J~~UARY 1 T9 MARCH 31, 1979 - FINANCE DIVISION
Total To \; of Forecast t
Budget March 31/79 Budget Dec. 3l/7~
ADMINISTRATION $ $ $
Revenues 70,000 15,152 22 70,000
-
-,
Expenditures
Salaries 560,150 147,942 26 560,150
Employee Benefits 440,500 114,180 25 440,500
Travel Expenses 97,500 11 ,607 11 97,500
Vehicles & Equipment 36,000 9,310 26 36,000
Materials & Supplies 81,500 27,815 34 81,500
Rent Ii Utili,ties 77,250 15,211 20 77,250
General Expenses 54,100 4,726 9 54,100
-
1,347,000 330,791 25 1.347,000
-
-
Expenditures are on budget for the following activities:- salaries, employee benefits, travel
expenses, vehicles and equipment and general expenses.
Materials Ii Supplies
Uniforms and Equipment 7,500 7,743 103 7,500
Postage 16,000 4,441 27 16,000
Stationery and Office Supplies 50,000 7,429 15 50,000
Office Equipment 8,000 8,201 102 8,500
-
81,500 27,814 34 82,000
-
-
a) Uniforms and Equipment expenditures represent purchases for inventory and are reduced
as recoveries are made from sales to employees.
b) Postage expenditures are on budget.
c) Stationery and Office Supplies are on budget for this activity.
d) Office Equipment expenditures include payment for service contracts for office equip-
ment for the year. It is estimated this account will be overspent by $500.00 as a
result of higher cost of service contracts.
Rent Ii Utility Services: Expenditures are on budget for this activity'based on projected
expenditures for the balance of the year.
Total To , of Forecast to
Budget March 31/79 Budget Dec.. 31/79
GENERAL OPERATIONS $ $ '.
Revenues
Rental Properties etc... 16.S0~ 18,307 111 22,000
Interest (net) - (10,055) - -
-
16,500 8,252 50 22.000
-
. Expenditures -
Office Cleaning 19.000 4,254 22 19,000
Office Maintenance 32,000 7,316 22 32,000
Other Expenditures 61,000 5,018 8 61,000
-
112.000 16,588 IS 112,000
-
-
Expenditures to date are comparable with anticipated budget levels.
ADH: wr Alan D. Harris
Administrator
Finance Division
1979.04.17.
THE CHAIRMAN AND MEMBERS OF THE EXECUTrvE COMMITTEE, M.T.R.C.A. B-IOO
TO:
MEETING 15/79
RE: HISTORICAL SITES DIVISION STAFF PROGRESS REPORT
JANUARY 1 TO MARCH 31, 1979
1) PROGRAM
(a) Registration and Artifacts
During the first three months of 1979, the Registration Department has
received 12 donations and has catalogued 92 artifacts.
All the benches in the Town Hall have been repaired and repainted. A
major reorganization of the collection held in storage is presently under
way. This long range project will provide more efficient use of all
Village storage areas and improved care of the collection. Some general
sorting and rearranging has been started wherever possible and the
Mackenzie House basement has been cleared in order to begin preparing
this area to house the textile collection.
(b) Publicity and Promotion
A large display of Victorian memorabilia was loaned to the Garden Club
of Toronto for their 1979 Spring Flower Show at the Civic Garden Centre.
Several dolls from the Black Creek collection have been included in an
exhibition called "Dolls of Many Cultures" at the Royal Ontario Museum.
A display of glass objects has been loaned to the Town of Caledon.
While the Village was closed to the public, it was rented by several
commercial photography groups. Olin Films used Burwick House and .
several exterior locations in the Village as, the set for a children's
Christmas film. Scollard Productions produced a Charge x commercial at
Laskay Emporium, C.B.C. filmed some material for a documentary on
Arthur Miller, and background for a news story on education. Henry Less
and Associates used Second House kitchen as the set for an introduction to
a Wide World of Sports Program. T.V. Ontario filmed some background material
at Dickson's Hill School for a documentary on French schools in Ontario.
Village staff have been interviewed on two C.F.T.O.-T.V. productions of
Kid's Korner and have taken part in three of John Bradshaw's shows on C.F.R.B.
Village staff have given talks and lectures to .the following org~nizations:
the Etobicoke Historical Society, the Society for the Preservation of
Historical Thornhill, the North York Senior Citizens Group and the Happy
Club Senior Citizens Group of the Kingsway Baptist Church. The first joint
meeting of the staffs of all Metro Museums was held in February and many
village staff attended. Mrs. Jeanne Hughes from Black Creek was the speaker
at this program.
(c) Special Events
During January, February and March, the Fisherville Church .was used for
eight weddings and two special services. In addition,. one service'was
held at the Mennonite Meeting House. 'Half Way House catered to seven
receptions. On January 20th, Warren Rill Catering Ltd.. arranged with
several food suppliers to provide food for a special "Pioneer Day". On
this day, prices at Half Way House and the snack bar were drastically reduced
to encourage. publicity for the Village. The day'was successful and over 1,500
people attend~d.
In honour of the "Year of the Child" a metal. plate has been produced from a
picture in Black Creek's collection, to be printed on the Washington Press
in the Print Shop.
(d) Building Maintenance and Construction
While th.e Village buildinas were closed for the season, the regular cleaning
and maintenance was carrie out. A new matte finish floor sealer has been
applied this year to eliminate the shiny look that the clear urethane has
given to pine floors. The two sets of stairs in the Second House have been
repaired and re~nforced. The hall wallpaper in Half Way House has been
replaced. Carpet was laid in the Registrar's Office. A change table for
B-I01
HISTORICAL SITES DIVISION STAFF PROGRESS REPORT
JANUARY 1 TO MARCH 31, 1979
Page 2
for babies has been installed in the public washrooms for the convenience
of our visitors.
(e) Ground Maintenance and Development
The wagons used to provide rides for visitors in the Village were fully
rebuilt and repainted. On weekdays during the winter, a sleigh-ride
service was provided for luncheon guests to Half Way House. The trees
~hout the Village have all been pruned and trimmed. The garbage-barrel
parking lot markers have been replaced where necessary for Village opening.
(f) Livestock
Two lambs arrived in time for Village opening and the rest are expected
later this ~ring.
(g) Staff
Several members of village staff attended an Ontario Museum Association
Symposium on 19th Century Gardens, held at the Royal Botanical Gardens
in Burlington. Staff from Black Creek and Gibson House in North York
took a four-day excursion in March, visiting the Ford Museum and Green-
field Village in Dearborn, Michigan and Park House, Fort Malden and the
Hiram Walker Museum in south-western Ontario.
2) FINANCIAL STATEMENT - January 1 to March 31, 1979
A. Operations & Maintenance -
Black Creek Pioneer Village
Total axlget Variance Buiget Used
Appropriation - ,
-
Experditures $ 191,113 $ 889,000 $ 697,887 21
Revenue $ 54,072 $ 822,000 $ 767,928 6.57
B. Historical Si~es Development
Total adget . Variance Buiget Used
~~tion - ,
Expeim.tures $ 3,230 $ 54,917 $ 51,687 5
3) FINANCIAL COMMENTS
A. Operations & Maintenance
Black Creek Pioneer Village
The attendance for the winter program in 1979 was somewhat less than for
the same time period in 1978. However, with the excellent weather during'
the school break, the first two weeks of the regular season had a higher
attendance. As of March 31, the 1979 figure was 13,559 (1,500 lower than
last year.) Consequently, gate revenue is down slightly, but sales outlets
have shown an increase.
The citizenship program has shown a considerable increase in 1979 with
218 members as compared to 125 in the first three ,months of 1978.
. HISTORICAL SITES DIVISION STAFF PROGRESS REPORT B-l02
JANUARY 1 TO MARCH 31, 1979
Page 3
Through the efforts of Mrs. Eustella Langdon and members of the Southern
Ontario Unit of the Herb Society of America, the Garden Club of Toronto
and the Dunington Grubb Foundation, the Village will be provided with a
student to work with our gardener for the summer. The student will be
mainly involved with the Doctor's Garden, the Dye Garden and the Kitchen
Garden.
B. HISTORICAL SITES DEVELOPMENT
Capital develoPment will be limited to three major restorations this
year -- the Taylor Cooperage, the Richmond Hill Manse and ~he Sawyer's
Home. Funds have been made available through the Metropolitan' Toronto
and Region Conservation Foundation, Wintario, and the Junior League of
Toronto to complete the restoration of the Cooperage and the Sawyer's
Home. It is hoped that funds will be available in 1980 to complete the
Richmond Hill Manse.
B-l03 Conservation Land Management Division
Progress Report
January - March, 1979.
Conservation Services:
Private Land Assistance Programmes
This Spring, approximately 108,000 reforestation trees will be planted on
private lands. This represents an increase of approximately sixty' thousan~
trees over last year's private reforestation assistance programme.
The farm tree and shrub programme will see approximately 5,342 farm trees
and 8,673 shrubs planted.
Six stream improvement projects have been scheduled for this Summer. A
stream assessment programme will be carried out on cold water streams in the
headwaters (Humber River and Duffin's Creek) to assist in developing a suit~
able management plan.
Five conservation plans have been completed this year.
The Authority tree spade is scheduled for seven private rentals.
Promotion of service programmes has resulted in the brochure and fact sheet
on urban wildlife enhancement and grassed waterwaYs. A Conservation Services
Field Day has been scheduled for Sunday June 3rd, 1979.
Four site visits have been carried out for pond services.
Authority Land ,Programmes
Reforestation trees will be planted:- Glen Haffy 10,900. Cold Creek 7,700;
Gibson Lake 10,200; Lake St. George 2,500; Clairevi1le Conservation Area
6, 300; Bolton Reservoir 1,500~ Heart Lake 2,300; and Boyd Conservation Area
1,200.
Woodlot management programmes have been under way at Claireville, Boyd, and
Bruce'S Mill Conservation Areas and at Gibson Lake. Approximately 155 cubic
metres of fire wood have produced, as well as 5,494 cub. bd. ft. worth of
sawlogs. Ten cords of pulpwood wree produced at Gibson Lake.
Stream improvement projects will be carried out at Albion Hills Conservation
Area this Summer.
Boy Scout groups from York Region and Ajax will be planting trees at Claire-
ville Conservation Area - 20,000, and 10,000 at Glen Haffy Conservation Area.
Special Projects
A tree maintenance programme will be undertaken at the Humber Bay East Water-
front project. P1antings are anticipated to begin this year at the Thackeray
Landfi 11 Si te . A landscape project will be carried out at the Kortright
Centre for Conservation. A number of Peel, York, and Durham erosion control
projects will be carried out by the Conservation Services. Section in conjunct-
ion with the Water Resource Division, Flood Control Section.
Conservation Areas:
Development
No development has taken place to date as budget approval has jot yet been
received from the Ministry of Natural Resources.
Operations
During the Winter, eight Conservation Areas were open for winter activities.
Most staff time was involved with routine operations. The ski programme
at Albion Hills operated at capactiy. The Bruce's Mill programme ran below
capacity. As this part of the programme becomes better k~own, this situation
will improve. The improved ski trails at Palgrave, Cold Creek, and Claremont
were well used. This past ski season was shorter than previous years due to
lack of snow in early January.
The Bruce's Mill maple syrup demonstration was improved with the addition to
the sugar shack, an Indiam method exhibit, and a self-guiding'trail booklet.
Attendance and product sales have incrased during the first pa~t of the
programme.
A promotional brochure and flyeD;have been completed for the Claireville
canoe programme. Response has been very encouraging with several group book-
ings already confirmed.
Preparations are now under way for the opening of all Areas for the Spri~g
and Summer seasons.
To April 1st, 1979, Conservation Area attendance decreased 62,934 or 38.5%
over the same period in 1978. This is a result of lack of snow during the
early part of the Winter. The following table compares individual Area
- 2 - B-l04
attendance in 1978 and 1979:
Conservation Area i979 1978
Albion Hills 36,294 64,734
Black Creek 7,408 15,746
Boyd 6,698 14,771
Bruce's Mill 26,918 28,369
Claireville 3,163 5,042
Claremont 1,852 5,092
Cold Creek 6,192 9,488.
Glen Haffy - -
Greenwood 1,696 7,250
Heart Lake 4,297 13,131
Palgrave 5 , 898 -
Petticoat Creek - -
Woodbridge - -
TOTAL 100, 416 163,623
Financial Statement - January - March, 1979
I
Yr. to Date TOtal , ~udget Forecast To
Expend. Commit Approp. Budget Used Dec. 31/79
. Cons. Areas
Develop. 36,523. - '36,523. 270,000. 13 270,000.
Cons. Areas
Operate 279,016 10,159. 289,175. 1,370,800. 21 1,370,800.
Rent &
utility Servo 10,278. - 10,278. 39,000. 26 39,'000.
Private Land J
Programme 18,603. 1,751. 20,,354. 113,000. 18 113,000.
Authori ty Land
Programme 18,950. - 18,950. 95,000. 20 95,000.
Cons. Areas
Revenue 115,111. - 115,111. 710,000. 16 710,000.
Private Land
Revenue 180. - 180. 15,000. 1 15,000.
Financial Comments: -
COnservation Services
To date, approximately 20' of the budget for Conservation Services has been
spent. Revenue for private' land programmes will be met as many p~~grammes are
now under way.
COnservation Areas
The only expenditures to date have been for support staff. As soon as budget
approval is received, work will commence. on Development items.
Conservation Areas ,Operations expenditures during this period are as antic- .
ipated. Revenues are slightly down from previous years due to lack of snow
at the beginning of the Winter season. Both spending and revenues will be
within budget estimates.
t
lQ7CL 04.19.
B-l05
TO: The Chairman and Members of the Executive Committee,
M.T.R.C.A. - Meeting 15./79
RE: INFORMATION & EDUCATION DIVISION PROGRESS REPORT -
January 1 - March 31, 1979
(a) INFORMATION
The Community and Staff Relations Program has continued to place
renewed emphasis on the resource management activities of the
Authority that are identified with the Conservation and Recreation
Land Management Plan and the Water and Related Land Management
Plan. Considerable time has also been spent on an Information
Program to promote the fund-raising activities of The Metropolitan
Toronto and Region Conservation Foundation. '
Highlights Included:
- the production of 230,000 pieces of literature including:
- 200,000 copies of the four-colour general brochure,
- 10,000 copies of the 1979 Calendar of Events and Activities;
- 2,000 copies of the 1977-78 Biennial Report,
- 1,000 copies of the Meeting Facilities Brochure for the
Kortright Centre for Conservation,
- 500 copies of the 1979 Directory;
- 5,000 copies of the four-colour brochure for The Metropolitan
Toronto and Region Conservation Foundation;
- 225 copies of the sixty-six-page catalogue for Foundation
fund-raising;
- 10,000 stick-on name tags.
- the completion of three special printing projects (20,200) for
Albion Hills Conservation Field Centre, the Kortright Centre for
Conservation and the Soil Conservation Society of America
- the agreement to participate in the "superguide" with the
Convention & Tourist Bureau of Metropolitan Toronto was approved -
the Bureau is printing 300,000 copies of the "Superguide" and an
overrun of 300,000 copies of the Attractions of Metropolitan
TOronto
- the production of twenty-five news releases for the media and
School Boards (total distributed - 21,300)
- samples of 250 press clippings, on all aspects of.the Authority's.
activities, have been received
_ forty-three colour television promos (one-minute), on the Spring
related activities of the Authority, have been distributed and
are in use
- one Authority exhibit was set-up and on display for Canada
Heritage Week in the Scarborough Town Centre
- the production and distribution of 750 copies of "Highlights", the
Authority's external newsletter
- five special photo assignments have been completed during this
periOd
- there are now new postage meter. identification stamps, relating
to Authority activities (eg. Alert Your Children of the Dangers
of Spring Flooding)
- three new one-minute colour public service films are now in
progress - one for the Kortright Centre for Conservation
- one for Flood Control and Water Conservation
- one for The Metropolitan Toronto and Region
Conservation Foundation.
Page 2 8-106
TO: Chairman and Members of the Executive committee,
M.T.R.C.A.. - Meeting 15/79
RE: INFO~mTION AND EDUCATION DIVISION PROGRESS REPORT -
January 1 - March 31, 1979
(b) EDUCATION
(i) Residential Field Centres:
- booked beyond 90% occupancy.
- usual range of elementary and secondary level students.
- such additional groups as girl guides, church groups,
a leadership training group, the Society of Environ-
mental Biologists, a Ministry of Natural Resources
Workshop.
- the finalizing of summer programs that include the
Archaeology credit course for senior secondary
students at Boyd, the March of Dimes summer camp at
Claremont and the York University course in Conservation
and Environmental Education (Geogr~phy 255) at Albion.
- the continuation of the,Practice Teaching Program for
Faculty of Education students from both the University
of Toronto and Althouse College at the University of
Western Ontario.
(ii) Lake St. George Conservation Field Centre:
- the students from the various Metropolitan Toronto School
Boards are actively engaged in partitioning, dry-walling,
plumbing, wiring, painting, sheet metal and heati~g
installation.
- the Metropolitan Separate School Board are buildinq
the beds and the York County Board of Education have
agreed to assist with the clean up and landscaping.
(iii) Kortright Centre for Conservation
- the official opening scheduled for mid June of this year.
.- the workshop now fully operating and an Exhibit Preparator
hired on a six-month contract.
- the recommendation from the Theme Committees for the
design and program components related to both the
Forestry and the Fish and Wildlife themes was approved.
- the approval of a Wintario grant for' 50% of the total
project cost of $233,319.
- the establishing of a Fund Raising Committee by the
Foundation, to raise $150,000.
- the development of the outside area to include:
(a) a sawmill 'to be operating by May 1, 1979;
(b) the filling and landscaping of the wildlife
pond;
(c) the planting of trees and shrubs and the
continued extension of trail develo~nt,
(d) the development of the first phase of the
patio;
(e) the development of the first phase of the
entrance.
(iv) Black Creek Pioneer Village - Education Tour and
Pioneer Life Programs. \
I
- the continued high interest in tpe programs on the
part of teachers and students.
- the continuation of the Practice Teaching Program
for the Faculty of Education students from the
University of Toronto.
- the involvement of teacher groups in the programs
as part of their professional development.
I
;
...3...
B-!U7
Page 3
TO: Chairman and Members of the Executive Committee
M.T.R.C.A. - Meeting #5/79
RE: INFO~~TION AND EDUCATION DIVISION PROGRESS REPORT
January 1 - March 31, 1979
(v) Special Programs
_ the Maple Syrup .programs at Kortright and Bruce's
Mill were again very successful - almost 100% booked.
2) FINANCIAL SUMMARY
A. Operations and Maintenance - Community Relations
Information and Education Operations.
Expenditures Expenditures Expenditures
1979 Budget To-Date % of Budget
$859,000 $143,875 17%
Revenue Revenue Revenue
19 79 Budget To-Date % of Budget
$757,700 $143,266 19%
B. Water and Related Land Management -
Cor.~unity Relations Program (WlO)
1979 Expenditur~s Expenditures
Budget To-Date % of Budget
$471,194 $100,168 21%
(project elements)
$239,000 51,933 21%
(non-project
elements)
C. Conservation and Recreation Land Management -
Conservation Area Information and Interpretive Program (C3)
1979 Expenditures Expenditures
Budget TO-Date % of Budget
$21,000 $5,461 26%
FINANCIAL COMMENTS
(a) Operations and Maintenance - Community Relations
Expenditures and revenue are in line with budget estimates.
(b) Water and Related Land Management - Community Relations
Program (WlO)
, .
Expenditures are in line with budget estimates, except
Lake St. George, where costs wil~ be approximatel~
$15,000 over budget. .This amount will be included in
Phase 2 of the Lake St. George development. Funding for
this second phase is available in the 1979 budge~s of
the participating school boards~
(c) Conservation Area Information and Interpretive Program (C3)
Expenditures are in line with bu~get estimates.
T',E. Barber"Administr~tor,
Information and Education Division.
B-I08
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE
M.T.R.C.A. - Mtg. '5/79
FROM: Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979
FLOOD CONTROL SECTION
1) MAINTENANCE WATER CONTROL STRUCTURES
(a) PROGRESS
Normal day to day maintenance was carried out on all the water control
,structures. The inspection of all the structures after the spring
runoff has been completed~ The major'maintenance contemplated for this
'year ,has received Provincial approval and consists of a study of 'the
Lower Humber weirs and fencing of the Brampton Diversion Channel.
(b) FINANCIAL STATEMENT TO MARCH 31, 1979
Ye'ar , of . Forecast
To Date" Total Budget; to
Expend. Comm,i.tments Approp. Budget '" Used Dee ,/31/79
"
$ $ $ $ ~-, $
Mainte- 28,022.10 928 28,950.10 18~,000.00 15 184
nance
(c) FINANCIAL COMMENT
The small expend1ture for these first three months is due to the
winter conditions making maintenance work on some structures
impossible. However, it is expected to,expend the total budget this
year.
2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS
(e) PROGRESS
Flood Warning and Forecasting System
This will be the last year of the three-year ptogr~ for the
acquisition of radio communication equipment and Provincial approval
has been received for this year!s equipment. The acquisition of
recording rain gauges is being studied as well for this'year.
(b) FINANCIAL STATEMENT TO MARCH 31, 1979
Year' , of Forecast
To Date Total Budget to
Exp~nd. C9mmitments Approp. Budget Used Dee /31/79
$ $ . $ $ , $
Telemark
Gauges 126.38 0 126.38 8,000.00, 1 7,873.62
Radio 11.53 0 11.53 . '15.,000.00 0 14,988.47
System
Staff 17,754.89 0 17,754.89 65,800.00. 26 48,045.11
Salaries
Staff 260.77 0 260. 7.7 . 3,700.00 7 3,439.23
Travel
18,153.57 O. 18,153.57 92,500.00 19 74,346.43
B-l09
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE
M.T.R.C.A. - Mtg.#5/79
FROM: Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 2
2) (c) FINANCIAL COMMENT
It is ~~pected to expend this budget this year.
"
3) INTERIM PROJECT CAPITAL
,
(a) PROGRESS
The Flood Plain Acquisition continued during this. period again
with concentration being made on properties within the Village of
Stouffville required for the proposed channel improvements.
The Headwater Acquisition Programme has seen the acquisition of all
major properties during this period. j.
Environmental Monitoring Programme has seen a receipt of the 1978
report and it is expected that the 1979 programme will commence in
the later spring.
The Flood Control Plan Review has continued seeing a completion, of
the mapping programme and the Hydrologic Modelling study.
The Floodline Plotting studies are also virtually completed which
has enabled cqmmencement of the damage centre analyses and flood
control alternatives study.
(b) FINANCIAL STATEMENT TO MARCH 31, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget U~ed Dee /31/79
Flood Plain
Acquisition 364,743.03 482,715.00 847,458.03 642,273.00 U1 642,273.00.
Headwater
Acquisition 143,450.59 0 143,450.59 200,000.00 71 200,000.00
Environmen-
tal
Monitoring 1,780.62 0 1,780.62 100,000.00 1 100,000.00
Flood Control
Plan Review 38,043.45 25,700.00 38,043.45 397,000.00 9 397,000.00
567,317.12 508,415.00 1,075,732.l~ 1~339,273.00 80.1,339,273.00
, (c) FINANCIAL COMMENT
It appears at this time, that the acquisition budget is over-
expended however, due to some flexibility in closing dates, some
of the commitments can be held over until 1980.
, 8-110
i
(
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE
M.T.R.C.A. - Mtg. #5/79
FROM: Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 3
4) INTERIM PROJECT CAPITAL -(BENEFITING MUNICIPALITY)
(a) PROGRESS
W.C.-58 - Don River ... Bathurst Street to Finch Avenue
The additional funds required as final payment.have been approved
and will be paid this year.
Erosion Control and Slope Stabilization in Metro
ITEM . LOCATION WATERSHED STATUS
Itajor Remedial Work 6-14 Sulkara Court Don River In progress
50-58 Stanwood Crescent Humber River In progress
19-45 Riverview Hts. Humber River In progress
lMinor Remedial Work Beechgrove Road Highland ~reek In progress
. - Phase II
Erosion Control and Slope Stabilization In Peel,' York and Durham
Remedial Work is in progress at 14th Avenue (Lots 5 , 6, Concession .S),
in the Rouge River Watershed.
Reconstruction of Highland Creek
1979 was the third year of the three-year programme for remedial work
within the Highland Creek. Work has been completed at the fOllowing
sites. It is expected that all of the sites damaged by the storms i~
1976 and 1977 will be repaired as contemplated under this project by
the end of 1979. '
LOCATION STATUS
Morningside Parks Yard Completed
Scarboro College T~nnis Courts Completed
South of Kingston Road Br~dge . Completed
B-lll
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE
M.T.R.C.A. - Mtg. i5/79
FROM: Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 4
4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS (Cont'd)
Engineering Studies:
Stouffville Channel
Detailed engineering is being ~ompletep for the channel works and it
is expected to start construct10n early this summer.
Wilket Creek Engineering Study
This study is expected to commence later this year once the completed
Hydrologic Model study and floodline study, have been received.
Oak Ridges Study
Draft report of this study has been received and it is expected to
finalize it early this summer.
(b) FINANCIAL STATEMENT TO MARCH 31, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec /31/79
~ ~ $ $ , $
W.C.-58 0 0 0 99,690.00 ' 0 99,690.00
Erosion
Control
Metro 58,629.03 19,491.00 78,120.03 825,000.00 9 825,000.00
Erosion
Control
Peel, York 3,929.81 0 3,929.81 200,000.00 2' 200,000.00
" Durham
Highland
Creek 115,573.20 548.00 116,121.20 240,000.00 48 240,000.00
Resto'ra-
tion
Stouffville
Channel 4,684.60 0 ",684.60' 395,000.00 1 390,315.40
Wilket 0 0 0 10,000.00 0 10,000.00
Creek
Oak Ridges 0 0 0 5,000.00 0 5,000.00
182,816.64 20,039.00 202,855.64.l~774,690.00 11 1,770,,005.40
B-1l2
'1'0 I THE CHAIRMAN AND MEMBIi;RS OF THE EXECUTIVE COMMITTEE
M.T.R.C.A. - Mtg. '5/79
FROM: Administrator - Water Resource Division
RB: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 5
4) ec) FINANCIAL COMMENT
Of the $1,027,000.00 budget shown for the Erosion Control component
for Metro, Peel, York and Durham, it should be noted that $27,000.00
of the total is the anticipated revenue from the benefiting property
owners.
1979.04.19
JCM/fn
B-113
'1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
-Meeting 115/79
FROM: ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO MARCH 31, 1979
Page 6
WATERFRONT SECTION
The Authority received word from the Province early in 1979 that the
Supplementary Waterfront Project had not been approved. The funds which were
requested in the Supplementaty Project were intended to allow the Authority
to proceed with the shoreline management program, some additional development
of the Western Beaches and to start the Colonel Samuel Bois Smith waterfront
project. As a result of the Province's decision, these projects will again be
deferred. The Municipality of Metropolitan Toronto has however, agreed to
carry the Municipality's portion of the Supplementary Project in their forecast
for 1980-1981- Requests for Provincial contributions to this project will be
made again this year for funding in 1980. However, the waterfront project is
presently being funded at a level of approximately 2.8 million per year, which
will enable the Authority to proceed with the development of Humber Bay and
Bluffers Park waterfront areas. In addition, some shoreline management works
will be undertaken and the Environmental Monitoring program will be continued.
StUdy and design activities related to shoreline management and future water-
front projects will also be undertaken.
COLONEL SAMUEL BOIS SMITH
-The Master Plan for the site has now been approved by the Ministry of Natural
Resources and formally submitted to the Ministry of the Environment for approval
under the Environmental Assessment Act. It is anticipated that the Ministry of
the Environment will advise the Authority in the very near future as to the
suitability of the Master Plan'document under the Environmental Assessment Ac~.
If the Ministry of the Environment determines that the document addresses all
the concerns under the Act, then the Mi~istry will shortly thereafter advise
whether or not a public hearing ,will be required. Authority staff anticipate
that due to the concern expressed by some local residents, the Ministry will
call for a hearing.
HUMBER BAY WEST
-The landfilling operation was terminated in mid-Februax:y following the
completion of the land base as defined in the Master Plan. The total area
created as part of Phase II was 43 acres (17.49) , which combined with the
lands previously created as part of Phase I, result in the total Humber Bay
West project now encompassing 64 acres (25.99) .
-The Authority construction activities through 1979 will be confined to the
placing of rubble material as a base for the roads .nd parking lots, as well
as continuing operations to com~lete the rough grading. .
-The major activity at the site in 1979 will be the result of the construction
activities of the Humber Bay Boating Federation. The Federation plans to install
460 boat slips this season, and the floating docks required for this project-
are presently being pre-fabricated. It is anticipated that the instal'lation
of the docks will begin in early May with completion scheduled for sometime
in mid-June.
HUMBER BAY EAST
-The final plans for the pond sy-stem, park buildings" and entrance road and
parking lot have been completed and contract specifications are being prepared.
It is anticipat~d that tenders' will be called early in May.
-The landscaping plans have also been prepared, but funds will not permit this
work to be completed in 1979. Final landscaping will be undertake~ tiy the
Conservation Land Management Division in the spring of 1980.
..
8-114
TOI THE CHAIRMAN AND MEMDERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
-:Meeting 115/79
FROMI ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT
From January 1. 1979 to March 31, 1979
Page 7
WESTERN BEACHES
-The detailed Master Plan and proposed program of development are nearing.
completion. However, discussion with the City,of Toronto officials is ongoing
with respect to the proposed development between the Boulevard Club and the
Toronto Sailing a~d Canoe Club, a~ well as condit,ions of the transfer of lands
to the Authority.
BLUFFERS, PHASE II
-The landfilling operation during the winter months was confined to the
protected area to'be occupied by th6 Bluffers Boating Federation.
-Although fill volumes were low through January and February, the volumes
increased rapidly following the completion and closing of the Humber Bay West
project. Subsequently, an area in excess of 2 acres has been created during'
March and April. The total landfill area associated with Blutfers Phase II
is now approximately 39 acres (15. 8H) .
-The landfilling operation was again shifted to the outer breakwater as of
April 16th, and it is anticipated that most of the westerly arm of the break-
water will be completed this year.
-Predictions of fill volumes are substantially lower than in previous years,
but it is hoped that once the weather improves and construction activities
increase, a better prediction of fill volumes can b~ made.
-Federal funding of the project under the Small Craft Harbours Assis~ance
Program has been extended to allow for contributions to the final armouring
of Points 8 and 9. To date, the Federal government has agreed to allocate
$250,000 to the project, which should be sufficient to purchase all the'
necessary armouring materials and tQ transport some of the large armour-stone
to the site to be stockpiled. The remaining stone is being stockpiled in the
quarries to be transported and placed at a later date, ,either by ~he Federal
90vernment if funds allb~ or by the Authority.
-The plans of the Bluffers Boating Federation call for the construction of 120
boat slips in the 1979 season. Materials are presently being stockpiled on the
site and it is anticipated that pile driving will begin in the very near future.
-One of the major components of the Authority'~ involvement' in the project at
Bluffers in 1979 is the construction of two double launching ramps and associated
day mooring facilities. The contract for this p,roject was recently awarded to
Disher-Farrand Co. Limited with completion schedul.ed' for June 15th.
EAST POINT
-Discussions. are ongoing with the Authority's 'consultant. Hough 'Stansbury and
Associates in an effort t~ .finali~e the Master Plan review and to prepare site
plans in preparation for the construction to begin. at 'this site upon completion
of Bluffers Park.
ENVIRONMENTAL MONITORING
-The final report for the 1978 program has been received and presented to the
Waterfront Advisory Board. The outline for the 1979 program has also been
prepared and approved. The collection o~ field data will begin on April 18th.
B-1l5
'1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
-Meetinq 15/79
FROM: ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT
Prom January 1, 1979 to March 31, 1979
Paqe 8
SHORELINE MANAGEMENT
-Preparation of a detailed Master Plan in the Scarborouqh sector is onqoinq.
A proposal form a soil consultinq firm has recently. been received, which
covers the detailed analysis of slope stability of the Scarborouq Bluffs,
aimed at producinq recommendations on appropriate construction techniques to
stabiliz, the,Bluff face after the toe of the Bluffs bas been protected.
-If sufficient volume of surplus fill material is available ~t Bluffers Park,
the material will be used to construct a test section of the artificial beach
system'which appears to have particular advantaqes in stabilizinq the toe of
the Bluffs.
-The contrac~ drawinqs for protective work along the Eastern Beaches in the
City of Toronto have been completed. Unfortunately, the decision by the
Province not to approve the Supplementary Proje~t has resulted 1n insufficient
fundinq to undertake these works in 1979.
FINANCIAL STATEMENT TO MARCH 31, 1979
Year to Date Commitments Total Approp. Budqet . of Budqet Used
Expenditures
'.
Colonel Samuel Bois 3,029.77 - 3,029.77 50,000. 6
Smith Park
Humber Bay West 70,244"61 - 70,244.61 160,000. 43
Humber Bay East 853.81 - 853.81 950,000. 0
Western Beaches - - - 5,000. 0
Ashbridqe's Bay 1,219.61 - 1,219.61 5,000. 24
..
Bluffer~ Park 45,295.15 - 45,295.15 740,000. 6
East Point 4,012.31 - 4,012.31 20,000. 20
Petticoat Creek - - - 20,000. 0
Studies/Monitorinq 15,6.51.29 1,867.00 17,518.29 110,000. 15
Shoreline Manaqement '6,999.20 - 6,999.20 ,500,000 1
Land Acquisition 309.937.84 - 309,937.84 240,000 129
PROGRAM TOor:A.L 457,243.59 l,867.0Q ,,459,110,.59 2 ;800 , 000. 16
The Waterfront Development Budqet is qenerally on~tarqet, recoqnizinq that most of the construction activity vi11 not beqin
until early May. The over expenditure in the land acquisition budqet is a result of the Sunny Point expropriation settlement.
This over expenditure vi11 be dealt with in a future budqet amendment vhich vi11 also address the extent of the Authority's
involvement in ,the final armourinq of Bluffers Park. If the Federal qovernment is unable to undertake the final armourinq,
funds vi11 h~ve to be re-allocated in the Authority budqet, vhich may result in redu~tions in the shoreline manaqement proqram
and/or the development proqram at Humber Bay East.
tD
I
...
....
v
c... B-117
,
the metropolitan toronto and region conservation authority
minutes Report .6/79
EXECUTIVE COMMITTEE WEDNESDAY-MAY-16-1979 .6/79
The Executive Committee met in the Board Room, Authority Office, 5 Shoreham
Drive, Downsview, on Wednesday, May 16, 1979, commencing at 10:~O a.m.
PRESENT WERE
Chairman R. Grant Henderson
Vice Chairmap Mrs. F. 0811
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. 'r.H.. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning , policy W.A. McLean
Adm. - Historical Sites Division R.K. Co~per
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Executive Secretary Mrs. K. Conron
S'visor, Printing, Mailing' Office Supply Servo L. Cowie
Research Planner, Planning & Policy Mrs. A.C. Deans
Development Co-ordinator, Planning , Policy J . W. Malet1ch
Engineer-Reg. Control, Flood Control Section, WRD R. Saadia
Project Eng.-Dev't.,Flood Control Section, WRD A. G. Sahabandu
B. HARPER BULL CONSERVATION
FELLOWSHIP AWARDS -- 1979
Mr. Henderson advised that three scholarships have been awarded for 1979:
Miss M.E. Doran, University of Waterloo
Major Course of Study: Geography - Environmental Studies
Miss E.M. Saagh, University of ~ronto
Major Course of Study: Forest Management
('rhe Misses Doran and Saagh were unable to be present and their awards will
be forwarded to them)
Miss Renata M. Moras, Seneca College
Major Course of Study: Recreation Facility Management
Mr. Card stated that it had been decided to increase the number of scholarships
from two to.three since the calibre of applicants is high and the selection of
successful candidates is difficult.
. .
Mrs. Bull presented a cheque to Miss Moras and congratulated her on her success.
Miss Moras expressed her appreciation of the award to Mrs. Bull, the Foundation
and the Authority.
MINUTES
'rhe Minutes of Meeting 15/79 were pres~nted.
Res. 1138 Moved by: C.F. Kline
Seconded by: Mrs. F. Gell
B-1l8 -2-
RESOLVED THAT: The Minutes of Meeting #5/79, as presented, be adopted as if
read: . '. , " CARRIED;
SECTION I '~'~:, '. .
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
1. ONTARIO REGULATION 845/77 AS AMEND~D: .CONS,ERVATION AREAS -
METROPOLITAN TORONTO AND REGION -&- ONTARIO REGULATION 735/13
AS AMENDED: FILL, CONSTRUCTION AND ALTERATION TO WATERWAYS
-Appointment of Enforcement Officers
A staff communication was presented advising that the Authority is in
receipt of amendments to the subject regulations, as follows:
-The Authority may appoint, from time to time, officers to enforce
this Regulation".
Res. 1139 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The communication having regard to proposed amendments to
Ontario Regulations 845/77 As Amended and 735/73 As Amended, be received;
and
~E EXECUTIVE COMMITTEE RECOMMENDS THAT: The persons named below be
appointed officers to enforce regulations made under The Conservation
Authorities Act: (a) Ontario Regulation 845/77 AS Amended: Conservation
Areas - Metropolitan Toronto and Region: (b) Ontario Regulation 735/73
As Amended: Fill, Construction and Alteration to Waterways:
Kenneth G. Higgs John McCaffrey
William A. McLean Dennis MacKay
John W. Maletich David Williams CARRIED;
2. ONTARIO REGULATION 845/77 AS AMENDED: CONSERVATION AREAS -
METROPOLITAN TORONTO AND REGION
-Appointment of Enforcement Officers
A staff communication was presented 'advising that the Authority is in
receipt of amendments to the subject regulation, as follows:
-The Authority may appoint, from time to time, officers to enforce this
Regulation."
Res. 1140 Moved by: Mrs. J .A. Gardner
Seconded by: C.F. Kline
RESOLVED THAT: The communication having regard to proposed amendments to
ontario Regulation 845/77 As Amended~ be received: and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following persons be
appointed officers to enforce Ontario Regulation 845/77 As Amended, made
under The Conservation Authorities Act:
!
Conservation Land Management Division
Paul B. Flood Administrator
James D. Agnew Superintendent of Operations
Simon Bontje Regional Superintendent
Lawrence Maltby Regional Superintendent
William R. Robinson Safety Officer
Case P. Bontje Superintendent
Norman Taylor Assistant Superintendent
Rogert F. Baxter Lead yand
Jy n G. Sr~achan su~~r ntendent
G en Caus l.n As l.stant Superintendent
Murray MacDowell Superintendent
Herbert A. McIntosh Lead 'Hand
Gordon Kidd Assistant Superintendent
Daniel Whelan Lead Hand
John K. Britton Superintendent
Jack Lamers Assistant Superintendent
Jake Honingh Assistant Superintendent
'-3- B-119
Stephen Bain Superintendent
Frank Mellow Assistant Superintendent
Russell McMullin Superintendent
Robert Downey Assistant Superintendent
Henry Burke Superintendent
George F. Rogers Superintendent
Michael Carter Assistant Superintendent
Historical Sites Division
Rino ROncadin Gift Shop Manager
Norman Elliott Superintendent of Operations
James H. Lyons Asst. Superintendent of Operations
w. Alex Jackson Administrative Supervisor
Information & Education Division
Neil Shaw Superintendent
Fred Green Lead Hand
Allan Foster Curator
-and
THAT the staff be directed to investigate the possible appointment as,Enforce-
ment Officers, of part-time staff members at ~e Indian Line and Albion Hills
Campgrounds. CARRIED,
3. MILEAGE RATES:
AUTHORITY MEMBERS
A staff communication was presented advising that since mileage rat~s pay-
able to Authority members were adjusted in 1976, operating costs have
increased substantially, and an increase (from the existing rate of
12. 4C/km.) is recommended.
Res. flU Moved by: Mrs. J .A. Gardner
Seconded by: M.W.H. Biggar
RESOLVED THAT: The staff communication having regard to the proposed
increase in mileage rates payable to Authority Members be received, and
'l'HE EXECUTIVE COMMITTEE RECOMMENDS THAT: Subject to the approval of the
Ontario Municipal Board, the mileage rates payable to Authority Members be
increased to l3-3/4C per kilometer, effective July l, 1979.
CARRIED,
4. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
-Budget Revision
A staff communication was presented advising that $75,OOO.OO,of the
Authority's 1979 expenditures for flood plain mapping are eligible for
supplementary funding due to funds received by the Province of Ontario
under the Federal/Provincial Flood Damage Reduction Programme. The budget
amendment reallocates the funds to Land Acquis~tion and to the Milne
workshop, which is being re-provisioned as a result of a fire last year.
Res. U42 Moved by: E.H. Card
Seconded by: J.S. Scott
RESOLVED THAT: The'Budget Revision for the Interim Water and Related
Land Management Project - Capita~ - All Benefiting, be received and
appended as Schedule "A" of these Minutes; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The Budget Revision for the
Interim Water and Related Land Management Project - Capital, - All
Benefiting be included in the 1979 Budget Estimates of the Aut~~ri,ty.
CARRIED,
B-l20 -4-
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY ~IE EXECUTIVE COMMITTEE:
5. FUNCTIONAL AND WATERSHED ADVISORY BOARD MEETINGS
-Registration of Members
At Meeting #5/79, held April 25, 1979, the following Notice of Motion
was submitted for consideration of the Executive Committee at this
meeting:
Motion Moved by: Mrs. F. Ge11
Seconded by: J.S. Scott
THAT the registration of Committee members attending functional and
watershed advisory board meetings be closed 30 minutes after the
time called for the meeting.
THE MOTION WAS received, discussed, but not voted upon.
6. ANNUAL 'SUGARING OFF' FUNCTION
At Meeting 15/79, held April 25, 1979, the following Notice of Motion
was submitted for consideration of the Executive Committee at this
meeting:
Res. 1143 Moved by: Mrs. F. Gell
Seconded by: M.W.H. Biggar
RESOLVED THAT: , The Annual "Sugaring Off" function.. sponsored by the
Authority, ~ot be held in 1980: and
THAT the staff take under consideration some other type of functio~ and
report,back to the Executive Committee.
CARRIED,
7. 1979 CONSERVATION AUTHORITIES' TOUR,
LAKE ERIE REGION:
-September 30-0ctober 3, 1979
A communication was presented advising that the Authority has been
allocated 8 tickets for the 1979 Conservation Authorities' TOur to the
Lake Erie ~egion, September 30-0ctober 3, 1979.'
Res. fl44 Moved by: E.H. Card
Seconded by: J.S. Scott
, RESOLVED THAT: The Authority participate in the 1979 Conservation
Authorities'TOur of the Lake Erie Region, september 30-0ctober 3, 1979,
and
THAT subject to availability of allocation, the following persons be
authorized to attend:
R. Grant Henderson Mrs. J.A. Gardner C.F. Kline
Mrs. S. Martin E.V. Kolb W.A. McLean
J.S. Scott M.W.H. Biggar M.R. Garrett
AND FURTHER THAT their expenses, in the amount of $195.00 per delegate,
be paid. CARRIED;
8. COMMEMORATIVE FOREST - LESKARD
The Chairman advised that a communication has'been received from The
Nature Conservancy of Canada requesting support for the acquisition of a
twenty-acre tract of heavily forested land at Leskard as a commemorative
woodland.
-5- B-l21
Res. 1145 Moved by: C.F. Kline
Seconded by: J.S. Scott
RESOLVED THAT: The Metropolitan Toronto and Region conserVa~ion Authority
donate $500.00 to The Nature Conservancy of Canada in support of the '
acquisition of a twenty-acre tract of land at Leskard, Ontario, on the
headwaters of the Wilmot Creek, to serve as a Commemorative Forest in
memory of A.H. Richardson, A.S.L. Barnes and J.D. Thomas.
CARRIED'
9. REPORT 11/79 - CONSERVATION LAND
MANAGEMENT ADVISORY BOARD
"
Report 11/79 of the Conservation Land Management Advisory ,Board was
presented. ' ,
Res. 1146 Moved b~: E.V. Kolb
Seconde by: M.J. Breen
~~p ~AT: Report 11/19 of the Ca1serVation Land ~qement Mvisary Beard be
THAT the Interim Conservation and Reereation' Land Manaoement
Plan be circulated to all municipalities within the jurisdiction of the
Authori ty and to the Province of Ontario for comment J and
'l'HAT the municipalities be advised that staff of The Metropolitan TOronto
and Region Conservation Authority will be pleased to present the Plan to
councils or appropriate committees on dates convenient to them.
CARRIED,
10. QUOTATION 179-13
Beart Lake Conservation Area
-Chain Link Fencing
A staff communication was presented advising that the following quotations
have been received for approximately 950 lineal feet of 6' high chain link
fencing, including all posts, braces and rails, to match existing fence
along the western boundary of the Heart Lake Conservation Area:'
F. Powell & Company Ltd. $5,124.16
Roma Fence 5,452.00
Frost Fence 5,633.50
Butt Fence Limited 5,670.00
Res. U47 Moved by: M.W.H. Biggar;
Seconded by: E.H. Card
RESOLVED ~AT: The quotation received from 'F. Powell , Company Limited
for approximately 950 lineal feet of 6' chain link fence, including top
rail, braces, line and terminal posts, all fittings and installation, in
the sum of $5,124.16, for the Heart Lake Conservation Area, be accepted,
it being the lowest quotation received.
CARRIED,
11. QUOTATION '79-22
Lake St. George Forest & Wildlife Area
-Waterline Pipe
A staff communication was presented advising that the following quotations
have been received for the supply of ~abour and equipment for the
installation of approximately 3,200 lineal feet of 38 dia. P.V.C.'water-
line pipe for the above-noted Area:
Jack Gilbert & Sons @ 70C per line ft. .-$2,240.00
Harry Smith & Sons @ $3.60 per lin.ft.=$ll,520.00
Sid Balik Plumbing - No quotation received
Res. '148 Moved by: E.V. Kolb
Seconded by: C. F. Kline
RESOLVED THAT: The quotation received from Jack Gilbert & Sons for the
supply of labour and equipment required to install approximately 3,200
lineal feet of 3ft dia. P.V.C. pipe for the Lake St. George Forest and
Wildlife Area waterline, in the sum of $2,240.00 (70C/ft.) be accepted,
it being the lowest quotation received.
CARRIED,
B-122 -6-
12. QUOTATION #79-20
Kortright Centre for Conservation
-Realignment and Construction of Roadway
A staff communication was presented advising that the following quotations
have been received for the 'realignment and construction of an existing
roadway at the Kortright Centre for Conservation: .
King City Paving Company $14.00 per sq. yd.
Fermar Paving Limited $19 . 00 . . -
Res. 1149 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received from King City paving Company for
the realignment and construction of an existing roadway at the Kortright
Centre for Conservation, in the sum of $l4.00 per square yard, be
acce~ted~ it 'being the lowest quotation received. ('1btal cost for project is
$2,4 0.00). , CARRIED;
13,. QUOTATION .79-2l
Kortright Centre for Conservation
-Paving Stone
A staff communication was presented advising that the following quotations
have been received for the laying of paving stone at the Kortright Centre
for Conservation:
Algonquin Environments $1.43 per sq. ft.
Leslie L. Solty & Sons Ltd. $1.05 . . -
Res. 1150 Moved by: E.H. Card
Seconded by: Dr. T.R. Leith
RESOLVED THAT: The quotation received from Leslie L. Solty & Sons Limited
for the laying of paving stone at the Kortright Centre for Conservation,
in the sum of $l.05 per square foot, be accepted: it being the lowest
quotation received. (TOtal cost for project is $1,70~.00).
CARRIED;
14. CONSERVATION AND RECREATION LAND MANAGEMENT
1979 VISITOR SURVEY
A staff communication was presented advising that the Conservation Land
Management Division staff is currently carrying out a four-season visitor
survey in the Conservation and Forest & Wildlife Areas. The funding for
the study was included in the 1979 Conservation and Recreation Land
Management Development Budget.
Res. 1151 Moved by: J.S. Scott
Seconded by:, C.F. Kline
RESOLVED THAT: Dr. Reiner Jackson of Jackson & Associates be retained, at
a per diem of $250.00 for a period up to and including 15 days, to assist
staff in the analysis, cross-tabulation and interpretation of data obtained
during the Conservation and Recreation Land Management 1979 v.isitor Survey.
CARRIED,
15. PAYMENT FOR PERSONAL VEHICLES
A staff communication was presented advising that since the rates payable
to staff using their own vehicles for Authority business were adjusted in
1976, operating costs have increased substantially, and an increase (from
the existing rate of l2.4~/km. is recommended.
Res. 1152 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: Rates payable to staff using their own vehicles for
Authority business,be increased to l3-3/4~ per kilometer, effective June 1,
1979. CARRIED;
-7- B-l23
16. QUOTATION #79-l(I&E)
-Black Creek Pioneer Village Brochure
A staff communication was presented advising that the following quotations
have been received for the printing of lOO,OOO copies of the Black Creek
Pioneer village brochure, as follows:
C.F. Haughta1 Limited $3,094.00
Northern Miner Press Limited 3,259.81
Yo%k Litho Limited 3,286.00
Olarters Publishing Co. Limited 3,386.61
SOutham Murray Printing 3,448.00
NoYaprint Limited 3,456.20
)l1l.ticolour Printing Limited 3,609.70
westprint 3,633.00
Noble Scott Q:Jopany Limited 3,650.00
JHF Praiuctions Canada Limited 3,691.00
Yorkville Press Calpany Limited 3,732.16
Lawson Grapucs 3,770.00
Mac:Ki.nron-lO'1c:ur Limited 3,895.44
McLaren, M:>xris & 'lbdd Limited 3,942.00
Dlvis & Henderson Limited 4,110.00
BaRbrick Printing 4,147.36
Hawker Siddeley Graphics 4,167.20
Phipps Reproductials Co. Limited 4,198.68
Efmac Printinq & Grapti.c Services Ltd. 4.332.00
Janes A. Cook-Dlvis Printirq Ltd. 4,432.00
Canadian Offset 0>. Limited 4,648.00
Carswell Printing Calpany 4,650.00
D::indi Printing Services Limited 4,668.37
O:I'II-M Manufacturing' Co. Limited 4,869.30
R.B. Trade Printing Service Ltd. 4.898.46
William !bx Associates 4,965.00
York Printing House Limited 5,055.91
Ocok Printinq Canada Limited 5,093.23
~t Printers Limited 6,010.00
ASS Publishing Limited 6,414.65
Gaylord Lit:hograpUnq Ltd. '1DmER N:7r cx:H'IBl'E
Decal Industries Inc. '1DIlER N:7r CXM?IBl'E
Howarth & Sl1li. tit Limited tImBLE '10 0X71E
Kinball Systems tImBLE ~ QlD1'E
ItXqan Dlvis Printi.D] awu: '10 Q(Dl'E
Res. 1153 Moved by: C.F. Kline
Seconded by: E.V. Kolb
RESOLVED THAT: The contract for the printing and supply of 100,000 copies
of the Black Creek Pioneer Village Brochure be awarded to C.F. Haughton
Limited at the quoted sum of $3,094.00, including taxes. CARRIED,
17. KORTRIGHT CENTRE FOR CONSERVATION
-Secondment of Staff - Wildlife Biologists
A staff communication was presented advising that the two-year agreement
between the Ministry of Natural Resources and The Metropolitan Toronto and
Region Conservation Authority, for cost-sharing for two wildlife biologists
to develop the Fish and Wildlife Theme at the Kortright Centre for
Conservation, expires September 30, 1979. It is proposed that the agree-
ment be continued for a two-and-a-half year period, commencing October 1,
1979, on the basis that the Min~stry will provide the entire cost of the,
two biologists for the first six months and the entire cost for one biolo-
gist for the remaining two years of the agreement. The Authority will be
responsible for the provision of office space, travel and other rela~ed
expenses, cost of audiovisuals, exhibits and development related to the
Fish and Wildlife Theme Program.
Res. 1154 Moved by: E.H. Card
Seconded by: M.J. Breen
RESOLVED THAT: The agreement between The Metropolitan Toronto and Region
Conservation Authority and Her Majesty the Queen in Right of OntariO, as
represented by the Minister of Natural Resources for the province of anbUiD,
to develop a Fish and Wildlife Interpretation and Educational Program atthe
Kortright Centre for Conservation, be approved; and
THAT appropriate Authority officials be authorized and directed to sign
the necessary document to give effect thereto.
CARRIED,
B-l24 -8-
18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Municipality of Metropolitan Toronto
To undertake restoration works to existing storm sewer
outfall into' the East Branch of the Don River, just
east of its confluence with the Main Branch, between
Don Mills Road and the Don Valley Parkway, Borough of
East York
A staff communication was presented advising that an application has been
received from The Municipality of Metropolitan Toronto for permission to
undertake restoration works to an existing storm sewer outfall at the
above location.
Res. #l55 Moved by: Mrs. L.'Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
The Municipality of Metropolitan Toronto for a permit to undertake
restoration work to the existing damaged storm sewer outfall into the
East Branch of the Don River, just east of its confluence with the Main
Branch between Don Mills Road and the Don valley Parkway, Borough of East
York (Don River watershed), be approved, subject to:
(a) Every effort being made to minimize the silting of the river during
construction:
(b) All areas disturbed due to construction being restored to the satis-
faction of the AuthoritYJ
(c) An easement being obtained to enter and do work on Authority-owned
lands.
CARRIED~
19. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Family Leisure Centres of Canada Limited
To install watermain crossing a tributary of the Don
River, just south of Major Mackenzie Drive, west of
Keele Street, Town of Vaughan
,
A staff communication was presented advising that an application has been,
received from The Family Leisure Centres of Canada for a permit to install
a watermain across a tributary of the Don River at the above location.
Res. ,l56 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
The Family Leisure Centres of Canada, be received: and
THAT the application of The Family Leisure Centres of Canada for a permit
to undertake the installation of a watermain crossing a tributary of the
Don River in the area just south of Major Mackenzie Drive, west of Keele
Street, Town of vaughan (The Regional Municipality of York), Don River
watershed, be approved, subject to:
(a) All rip rap work being preceded by a filter mat or a 6--12" layer
of crushed stoneJ
(b) Every effort being made to minimize the silting ,of the creek
during construction:
(c) The creek configuration being maintained after the crossing is
completed:
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Town of vaughan.
CARRIED;
'-9- B-125
20. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Bell Canada
To install a buried conduit on Bramalea Road crossing a
tributary of the Etobicoke Creek, west of Bramalea Road,
north of Derry Road, City of Mississauga
A staff communication was presented advising that an application has been
received from Bell Canada for permission to install a buried conduit
across a tributary of the Etobicoke Creek at the above location.
Res. 1157 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff cOllllllunication, together with the application of
Bell Canada, be received~ and
THAT the application of Bell Canada for a permit to undertake the
installation of a buried conduit crossing a tributary of the Etobicoke
Creek, in the area west of Bramalea Road, north of Derry Road, City of
Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed,
be approved, subject to:
Ca) All gabion works being preceded by a filter mat or a '--12- layer
of crushed stone~
Cb) All areas disturbed due to construction being restored to the
satisfaction of the Authority~'
(c) Every effort being made to minimize the silting of the creek during
construction:
Cd) The creek configuration being restored after construct~on is
completed.
CARRIED,
21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Consumers' Gas
To install a gas pipeline crossing a tributary of the
Don River, just south of Steeles Avenue, west of
Bathurst Street, City of North York
A staff caamunication was presented advising that an application has been
received from Consumers' Gas for permission to install a gas pipeline
crossing a tributary of the Don River at the above location.
Res. 1158 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the,ap~lication of
Consumers' Gas, be received~ and
THAT the application of Consumers' Gas for a permit tp under~ke the
installation of a gas pipeline crossing a tributary of the Don River, in
the area just south of Steeles Avenue, west of Bathrust Street, City of
North York (Don River watershed), be approved, subject 1:0:
(a) The creek configuration being maintained after construction,
(b) Every effort being made to minimize the silting of 'the creek
during construction~ '
Cc) All areas disturbed due to construction being restored to the
satisfaction of the Authority,
Cd) An easement being obtained to enter and do work on Authority-
owned land.
CARRIED~
B-l26 -10-
22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
TOwn of Vaughan
To install storm and sanitary sewer crossing the New
Westminster Creek, with the storm sewer outfall into
the West Branch of the Don ,River, just north of Steeles
Avenue between Bathurst and Dufferin Streets, Town of
Vaughan
A staff communication was presented advising that an application has been
received from the Town of Vaughan for a permit to install a sanitary and
storm sewer across the New westminster Creek, with the storm sewer out-
fall into the West Branch of the Don River at the above location.
Res. 1159 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
the Town of Vaughan, be received: and
THAT, the application of the Town of Vaughan for a permit to undertake the
installation of a storm and sanitary sewer crossing the, New Westminster
Creek, with the storm sewer outfall into the West Branch of the Don River
in the area just north of Steeles Avenue between Bathurst and Dufferin
Streets, Town of vaughan (The Regional Municipality of York), Don River
watershed, be approved, subject to:
(a) All gabion works being preceded by a filter mat or a 6"-12" layer
of crushed stone.
(b) Sanitary manholes Numbers TlA and T8A being equipped with
watertight coverSi
(c) An easement being obtained to enter and do work on Authority-owned
'lands:
(d) All areas disturbed due to construction being restored to the satis-
faction of the AuthoritYi
(e) Every effort being made to minimize the siltinq of the river during
construction.
CARRIED;
23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Bramalea Limited
TO construct storm sewer outfall discharginq storm
water runoff into the Petticoat Creek, east of Rosebank
ROad, south of Highway ,#40l, Town of Pickering
A staff communication was presented advising that an application has been
received for a permit to construct a storm sewer outfall discharging storm
water runoff into the Petticoat Creek at the above location.
Res. 1160 Moved by: 'Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Bramalea,Limited"be received: and
THAT the application of Bramalea Limited for a permit to undertake the
construction of a storm sewer outfall discharging storm water runoff into
the Petticoat Creek, in the area east of Rosebank Road, south of Highway
1401, Town of Pickering' (The Regional Municipality of Durham) Petticoat
Creek watershed, be approved, subject to:
(a) A metal gate being placed at the outfall structurei
(b) No berm being formed across the flood plain as a result of the
storm sewer being installed in that valleYJ
(c) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Town of Pickering;
-11- B-127
(d) Every effort being made to minimize the silting of the creek
during construction:
(e) The bank of the valley being pxoperly stabilized and covered
after the installation of the sewer line.
, , CARRIED,
24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of Housing
To undertake restoration works on eroding section of
east bank of the West Branch of the Duffin Creek as it
flows through Whitevale Golf Course, Town of Pickering
A staff communication was presented advising that an application has been
received from the Ministry of Housing for a permit to undertake restoration
works on an eroding bank of the West Branch of the Duffin Creek at the
above location.
Res. 1161 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
the Ministry of Housing, be received: and
THAT the application of the Ministry of Housing for a permit to undertake
restoration works on an erOding section of the east bank of the West Branch
of the Duffin Creek, as it flows through the Whitevale Golf Course in the
area of Lots 30 and 31, Concession 4, Town of Pickering (The Regional
Municipality of Durham), Duffin Creek watershed, be approved, subject to:
(a) A filter mat or a 6w-12" layer of crushed stone preceding all
gabion works:
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority,
(c) Any areas disturbed due to access to the valley being restored
to the satisfaction of the Authority;
(d) Bo~h ends of the gabion wall being keyed into the bank:
(e) Every effort being made to minimize silting of the creek during
Construction. CARRIED,
25. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Proctor & Redfern Limited - on behalf of R.H. McGregor
To rehabilitate the side slopes of the Rouge River valley
which form part of Proposed Plan of Subdivision 55T-77007,
Borough of Scarborough
A staff communication was presented advising that an application has been
received from Proctor & Redfern Limited, on behalf of R.H. McGregor, to
rehabilitate the side slopes of the Rouge River valley at the above
location.
Res. 1162 Moved by: Mrs. L. Bancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Proctor & Redfern Limited on behalf of R.H. McGregor, be received, and
THAT the application of Proctor & Redfern Limited on behalf of R.H.
McGregor, for a permit to rehabilitate the side slopes of the Rouge River
valley, which form part of the Proposed Plan of Subdivision 55T-77007,
Borough of Scarborough (Rouge River watershed), be approved, subject to:
(a) All grading being in accordance with the detailed engineering plans
and profiles for the R.H. McGregor development,
(b) The storm drainage system being completed in accordance with the
engineering report,
B-l28 -12-
(c) Every effort being made to minimize the silting of the river
during construction;,
(d) All engineering details being approved by the Borough of
Scarborough Works Department. CARRIED;
26. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Markland Wood Country Club
To place fill on Lot 'G'. Borough of Etobicoke
(Etobicoke ,Creek)
A staff communication was presented advising that an application has been
received from Markland Wood Country Club to place fill at the above
location.
Res. #163 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Markland Wood Country Club" be received: and
THAT the application of Markland Wood Country Club for permission to place
fill in an area regulated by the Authority on Lot 'G', Borough of
Etobicoke (Etobicoke Creek watershed), be approved, subject to:
(a) Only clean fill being used:
(b) The applicant complying with his plans, as submitted, which will
form part of the permit:
(c) The fill being compacted;
(d) The fill area being seeded and/or sodded;
(e) All work being undertaken and completed to the satisfaction of
the Authority.
CARRIED;
27. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Samuel Sarick Limited
TO construct an addition to existing office building
on Block "E", Plan 9l9, City of Mississauga (Mimico
Creek Watershed)
A staff communication was presented advising that an application has been
received for permission to construct an addition to an existing office
building at the above location.
Res. 1164 Moved by: Mrs,. L: Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Samuel Sarick Limited, be received: and
THAT the application of Samuel Sarick Limited for permission to construct
an addition to an existing office building in a~ area regulated by the
Authority on Block "E", Plan 9l9, City of Mississauga (Mimico Creek water-
shed), be approved, subject to:
(a) The applicant revising his drawings wherein no openings to the new
building shall be lower than the regional elevation of l64.5(metric);
(b) A~l existing excavated material being removed from the site:
(c) The revised drawings, as recommended, forming part of the permit;
(d) Every effort being made to minimize silting of the creek during
Construction.
CARRIED'
-13- 8-129
28. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/13
Borough of Etobicoke
To undertake restoration and improvement works at West
Deane Park South, west of Martin Grove Road, north of
Rathburn Road, Borough of Etobicoke (Mimico Creek Watershed)
Application withdrawn at this time.
29. CITY OF NORTH 'YORK
-Request for Authority-owned Land:
Steeles Avenue Extension
Res. 1165 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
.
RESOLVED THAT: A parcel of Authority-owned land, containing 7.909 acres,
more or less, be conveyed to the City of North York for the extension of
Steeles Avenue between Kipling and Islington Ayenues. Said land being
Part of Lot 25, Concession VII, W.Y.S., City,of North York, des~gnated as
Parts 1, 2, 3, 4 and 5, Plan 64R-7584. Consideration to be the nomin~l
sum of $2.00, plus all legal, survey and other costs involved in complet-
ing the transaction: and
THAT said conveyance be subject to an Order-in-COuncil being issued in
accordance with Section 20(c) of The Conservation Authorities Act, a.s.O.
1970, Chapter 78, As Amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
docUMents.
CARRIED,
30. CITY OF BRAMPTON
-Request for Permanent Easement
A staff communication was presented advising that a request has been
received from the City of Brampton to provide a permanent easement for a
storm sewer required south of Church Street, west of Scott Street.
The proposed easement affects Authority-owned land known as Part of Lot 4,
Plan BR-15, City of Brampton (The Regional Municipality of Peel).
Res. 1166 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: A permanent easement be granted to the City of Brampton,
required for construction of a storm sewer, south of Church Street, west
of Scott Street. Said easement is shown as Part 1, Plan 43R-6645. The
Authority-owned land affected is Part of Lot 4, Plan BR-15, City of
Brampton, The Regional Municipality of Peel. Said easement to be granted
for the nominal consideration of $2.00, subject to the City of Brampton
being responsible for carrying out and paying all legal, survey and other
costs involved in the transaction: and
BE IT FURTHER RESOLVED THAT The appropriate Authority officials be
authorized and directed to sign the necessary dOCUMents to give effect
thereto.
CARRIED,
31. INTERIM WATER,& RELATED LAND MANAGEMENT PROJECT 1979-1981
Flood Plain and valley Land Acquisition Component - Don
River Watershed
-Property: The Municipality of Metropolitan TOronto
Res. 1167 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Report (May 8, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED,
B-l30 -14-
-Re: Project: Interim Water & Related Land Management project
1979-l98l - Flood Plain and Valley Land
Acquisition component - Don River Watershed
Authority: Executive Resolution No.133, Meeting No.4 -
April 12, 1978 and Authority Resolution No.5l,
Meeting No.3 - April 21, 1978.
Subject Property: Northeast corner,of Sheppard Avenue West and Don
River Boulevard
OWner: The Municipality of Metropolitan Toronto
Area to beAcqui.red: 0.441 acres, more or less
Recommended Nominal consideration of $2.00, plus survey and
Purchase Price: legal costs
-Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being Part of Lot l3, Registered Plan 2069, City of
North York, The Municipality of Metropolitan Toronto, located in the north-
east corner of Sheppard Avenue West and Don River Boulevard.
-Negotiations have been conducted with officials of The Municipality of
Metropolitan Toronto and, subject to the approval of your Committee, agree-
ment has b~en reached with respect to a purchase price, as follows:
The purchase price is to be the nominal consideration of $2.00,
plus survey and legal costs, with date of completing the trans-
action to be as soon as possible.
-I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, leqal costs and
disburseme~ts are to be paid. The Authority is to receive a conveyance of
the land required ,free from encumbrance.
-The Administrator of the Water Resource Division has reviewed this pro-
posed acquisition and is in concurrence with my recommendation.
-Funds are available.
-An application has been made to the Minsiter of Natural Resources for an
Inspection Certificate."
32. REPORT #1/79 - FLOOD CONTROL AND
WATER CONSERVATION ADVISORY BOARD
A staff communication was presented advising that the 1979 Watershed
Environmental Monitoring Programme was inadvertently omitted as a
recommendation of the Flood Control and Water Conservation Advisory Board
to Executive Committee Meeting 15, held April 25, 1979. .
Res. Il68 Moved by: Mrs. S. Martin
Seconded by: M.J. Breen
RESOLVED THAT: The 1979 Watershed Environmental Monitoring Programme,
involving an estimated expenditure of $80,924.40, be approved~ and
THAT ,the firm of Environmental Applications Group be retained as the
programme consultant.
CARRIED,
33. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Channel Improvements on,the Duffin Creek, Town of
Whitchurch-Stouffville:
Final Engineering
A staff communication was presented advising that detail~d engineering
in the preparation of contract drawings and documents has been completed
for the above-noted channel improvements. It is expecte4 to commence
construction this year and, therefore, approval of detailed engineering is
required.
Res. *169 Moved by: J.S. Scqtt
I Seconded by: Mrs. L. Hancey
-15- B-13l
RESOLVED THAT: The final engineering drawings and contract documents for
Channel Improvements on the Duffin Creek in the Town of Whitchurch-
Stouffvllle, under the Interim Water and Related Land Management Project
1979-l98l, be approved.
CARRIED,
34. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in The Regional
Municipality of Durham
Proposed Remedial Work - pine Ridge Road, Town of
Pickering (Rouge River Watershed)
A staff communication was presented advising that remedial work is
proposed at the rear of 1558 pine Ridge Road and vicinity, ~ of
Pickering. The work will consist of the introduction of french drains to
remedy the seepage problem and revegetation of the embankment.
Res. 11 70 Moved by: E.H. Card
Seconded by: C. F. Kline
RESOLVED THAT: Erosion control work be carried out at the rear of .558
Pine Ridge Road and vicinity' (Rouge River watershed), Town of Pickering,
at an estimated cost of $3,600.00; and
THAT the benefiting property owner be required to pay"an amount of $350.00.
CARRIED;
35. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control and Slope Stabilization in The Regional
Municipality of York:
Proposed Remedial Work - Hayhoe Avenue, Town of Vaughan
(Humber River Watershed)
A staff communication was presented advising that remedial work is proposed
at the rear of Nos.86-ll0 Hayhoe Avenue, Town of Vaughan. The work will
provide approximately 45 metres of rip rap protection along the existing
bank and revegetation of the embankment.
Res.Un Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: Erosion control work be carried out at the rear of Nos.
86-110 Hayhoe Avenue (Humber River watershed), Town of Vaughan, at an
estimated cost of $9,300.00: and
'!'HAT the approval of the Ministry of Natural Resources be requested,
AND FURTHER THAT the benefiting property owners be required to pay an
amount of $400.00.
CARRIED,
36. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Proposed Slope Protection Study - Northwest of Don Valley
Parkway and Lawrence Avenue, City of North York (Don
River Watershed)
A staff communication was presented advising that The Municipality of
Metropolitan Toronto Roads Department concrete channel in the vicinity of
the Don Valley Parkway and Lawrence Avenue is to 'be transferred to the
Authority following completion of repair work along certain sections of
the channel. The Metropolitan ROads Department has agreed to have 'the
Authority study and carry out the required work at their cost prior to the
Authority assuming responsibility for future maintenance of the channel.
A proposal from An~ew Brodie Associates Inc., Consulting Engineers, ~as
presented showing an estimated total study cost of $12,000.00, of Which
the Authority's portion would be $4,800.00.
Res. 1172 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: The staff communication having regard to proposed slope
protection study, northwest of Don valley Parkway and Lawrence Avenue,
B-l32 -16-
City of North York ,(Don River watershed), together with the proposal of
Andrew Brodie Associates Inc., Consulting Engineers, be received; and
THAT the staff be directed to retain the firm of Andrew Brodie Associates
Inc., Consulting Engineers, to study the slope instability problem at the
northwest corner of the Don Valley Parkway and Lawrence Avenue, in the
Borough of North York (Don River watershed), at an estimated cost of
$4,800.00.
CARRIED,
37. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Environmental Review of Flood Damaqe Centres
A staff communication was presented advising that at Executive Committee
Meeting #5/79, held April 25, 1979, James F. MacLaren Limited was
commissioned to locate all flood damage centres and provide damage curves,
as well as suggest remedial measures. The remedial measures decided on
will be evaluated as to their cost in relation to the benefit they provide.
While flood damage is the major cost, environmental alterations or loss is
another cost which must be considered before making a decision on the
solution to the flood problem.
It is proposed that Proctor and Redfern Limited carry out an Environmental
Review of the Damage Centres as determined by James F. MacLaren Limited..
Res. 1173 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: Proctor & Redfern Limited be retained to carry out an
Environmental Review of Flood Damage Centres at an estimated cost of
$23,000.00.,
CARRIED,
38. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Extra Flood Plain Mapping - Humber River Watershed:
Change Order #3
A staff communication was presented advising that it has been foUnd
necessary to obtain extra mapping in certain areas along the Humber River
to obtain sufficient information required in calculating the new floodline
elevations. In this regard, the following Change Order has been received
from the firm Marshall Macklin Monaghan Limited to provide for the extra
mapping:
Change Order #3 ........ $1,512.00
Res. #174 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: Extra Work Order 13 to the contract for the mapping of the
Humber River by Marshall ~cklin Monaghan Limited, in an amount of
$1,512.00, be approved.
CARRIED,
39. ,WATERFRONT PROJECT 1977-1981
-Etobicoke Sector: Mimieo Creek Dredging
A staff communication was presented advising that dredging is required at
the mouth of the Mimico Creek to ensure that launching ramps can be used
safely and to recreate a storage area.
Res. 1175 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: The mouth of the Mimico Creek be dredged to remove
approximately 25,000 cubic yards of material, at an estimated cost of
$50,000.00, subject to the approval of the Province of Ontario.
CARRIED,
-17- B-133
40. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl
-Proposed Erosion Control Work: 35 Canyon Av~nue, City of
North York (Don River Watershed)
A staff communication was presented advising that remedial work is
proposed at the above location. The staff has finalized engineering
design, construction specifications and preparation of tender documents,
which have been submitted to the Ministry of Natural Resources for
approval.
Res. 11 76 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: The design for the proposed erosion con~rol work at .35
Canyon Avenue, City of North York (Don River watershed), be approved, and
THAT the benefiting property owner, Mike Gold Construction Limited, be
required to pay $9,000.00 and to convey approximately 2.3 acres of land as
a prerequisite to carrying out remedial work.
CARRIED,
41. REPORT Il/79 - HUMBER'VALLEY
ADVISORY BOARD
Report 11/79 of the Humber Valley Advisory Soard was presented.
Res. 1177 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: Report fl/79 of the Humber Valley Advisory Board be
received, and
'l'HAT Recommendations fl and 12, as contained therein and set forth herein,
be approved:
!! The policy contained in the Interim Plan: Conservation and
Recreation Land Management, dealing with the management of
Authority lands by municipalities, include provision for
enforceable measures to be taken to ensure appropriate
maintenance standards;
12 The staff be directed to investigate the feasibility of
obtaining a copy of the film "Nonpoint 83" for use by the
Authority in promoting land management techniques suitable
for the reduction of pollution.
CARRIED,
42. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Drainage
A staff communication was presented having ,regard to the annual flooding
of a field immediately south of the dormitory building at the Lake St.
George Conservation Field Centre.
Res. '17 8 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The contract for the drainage of the field south of the
Lake St~ George Conservation Field Centre, including trenching and 40
feet of lS" dia. corrugated pipe, be awarded to Leonard Construction
COmpany at the price of $1,430.00.
CARRIED,
43. KORTRIGHT CENTRE FOR CONSERVATION
-Construction of Trails:
Quotation for Stone and Gravel
A staff cOmmunication was presented advising that the following quotations
have been received for the supply of stone and gravel for the construction
of trails at the Kortright Centre for Conservation:
B-134 -'18-
Indusmin Nelson Limestone
2- & 3/4- crusher run via tandem $5.30/ton $5.45 No reply
via trailer 4.60 5.25
1/4- screenings via ~andem 5.30 4.97
via trailer 4.60 4.50
1-, 2- , 3/4n clear via tandem ,5.40 5.45
, chips via trailer 4.60 5.25
Gabion Stone via tandem 5.62 5.75
3-5",4-8",6-8n via trailer 5.42
Rip Rap via tandem 6.90
oneman Stone 8-l2" via tandem 6.74
Res. 1179 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received from Indusmin for the supply of
stone and gravel for the,building of trails at the Kortright Centre for
Conservation, up to the maximum amount of 600 tons, be accepted, it
being the lowest quotation received.
CARRIED,
44. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Washrooms and Shower Rooms:
Seamless Flooring and Wall Finishing
A staff communication was presented advising that the following quotations
have been received for seamless flooring and epoxy wall finish for the
washrooms and shower rooms at the Lake St. George Conservation Field
Centre:
Seamless Flooring Wall
Duron Ontario Limited $2,200.00 $980.00
Brooks Marble & Tile Co. 2,888.00 No bid
Emazite Epoxy Flooring 3,100.00 No bid
Res. 1I180 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The contract for the seamless flooring and epoxy wall
finish in the washrooms and shower rooms at the Lake St. George
Conservation Field Centre bunkhouse be awarded to Duron Ontario Limited,
it being the lowest quotation received.
CARRIED'
NEW BUSINESS
45. MEETING 11/79 - R.D.H.P. ADVISORY BOARD
MRS. MARTIN advised the members that Meeting *1/79 of the R.D.H.P. 'Advisory
Board will take plaee on Thursday, May 24, 1979, commencing at 10:00 a.m.
at the Lake ,St. George Conservation Field Centre. Members of the
Executive Committee wishing to attend will be welcome.
46. OFFICIAL OPENING OF THE KORTRIGHT CENTRE
. FOR CONSERVATION
The Director of Planning & POlicy advised that the Official Opening of the
Kortright Centre for Conservation will take place on June 21st. The
Deputy Premier, Hon. Robert Welch, O.C. will officiate at the ceremony in
place of the Premier, whose schedule will not permit his attendance on
this occasion. '
47. STUDENTS
MRS. GELL requested that a letter be written to the Ministry of Natural
Resources advising that the Authority could accommodate more than the
allocated number of students.
-19- B-135
48. EXECUTIVE COMMITTEE MEETING - JUNE 13, 1979
MR. BREEN invited the Committee to hold the meeting scheduled for June
13, 1979, at his,Caledon home.
49. ADJOURNMENT
On Motion, the meeting adjourned at 12:50 p.m., May 16.
R. Grant Henderson W.A. McLean, Dizector of Plannin!r , Policy
'Chaizman Acting Secretary-Treasurer
1 9 79 BUDGET REV I S ION S PAGE: 31
PROGRAM: Water 8 Related Land Management - Interim Project Capital - All Benefiting DATE: May 11. 1979
o RIG I N A L BUDGET REV I 5 E D ' ,
BUDGET
Sources of Financing Sources of Financing
Net Provincial ~lunicipal Net Provincial Municipal
ACTIVITY Expenditures Grant Levy Other Expenditures Grant Levy Other
Plan Review A-55' Provincial Grant 397.000 218.350 178.650 - 297.000 163.350 133.650 -
Plan Review B - 90' Provincial Grant - - - - 75.000 67.500 7.500 -
Environmental Monitoring 100.000 55.000 45.000 - 100.000 55.000 45.000 -
Flood Plain Acquisition 642.273 353.250 289.023 - 667.273 367.000 300.273 -
Headwaters Acquisition 200.000 110.000 90.000 - 200.000 110.000 90.000 -
Reforestation 10.000 . 5.500 4.500 10.000 5.500 4.500
- -
.
Stream llIIprovements 20.000 11.000 9.000 - 20.000 11.000 9.000 -
Milne Workshop - - - - 20.450 11.248 9.202 -
en
n
:I:
tIJ
C
c::
t'"
tIJ
.
)I
.
Total 1.369.273 753.100 616.173 - 1.389.723 790.598 599.125 - III
I
....
IN
en
II'
I
...
w
1 9 7 9 BUDGET REV I S ION S 'PAGE: ~
30
PROGRAM: Water & Related Land Management - Interim Proj~ct Capital - All Benefiting DATE: May 11. 1979
PURPOSE: To provide for increased provincial cash flow received under the Federal/Provincial Flood Damage Reduction Program.
FUNDING: A 90\ rate of grant is available on $75.000 Flood Plain Mapping. The total increase in the budget is $2~.450. being
financed by $11.248 Provincial Grant and $9.202 Municipal Levy. The reduction in the municipal proportion to 10\
results in surplus municipal levy of $17.048.
EXECUTIVE APPROVAL:
AlIfHORITY APPROVAL:
.
.~ B-138
,
the metropolitan toronto and region conservation authority
minutes Report 11/79
EXECUTIVE COMMITTEE WEDNESDAY-MAY-30-l979 11/79
The Executive Committee met in "The Studio", Guild Inn, Scarborough, on Wednesday,
May 30, 1979, commencing at 10:00 a.m.
PRESENT WERE
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members, M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
M.D. Lipton, Q.C.
Mrs. S. Martin
J.S. Scott
Authority Member K. McCreary
Ministry of Natural Resources, Central Region R.D. Hunter
Secretary-Treasurer K.G. Hiqgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. ~ Property & Administration Division W.E. Jones
Executive Secretary Mrs. K. Conron
Research Planner, Planning & Policy Mrs. A.C. Deans
Supt'd. of Operations, BCPV N. Elliott
Head, Flood Control Section, WRD J .C. Mather
Senior Administrative Secretary Mrs. M. Mitchell
Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau
Supervisor, Property Administrat~on, P&AD D.J. Prince
Engineer - Regulation Control, WRD R. Saadia
ABSENT WAS
Member Mrs. L. Hancey
The Chairman introduced Mr. R.D. Hunter, Regional Conservation Authorities'
Programme Co~ordinator, Central Region, Ministry of Natural Resources.
ANNOUNCEMENTS
Mr. Henderson advised that a letter had been received from Mr. Paul Pickett, Q.C.,
tendering his resignation from the Waterfront Advisory Board in view of his
appointment to the Bench. A letter of appreciation of his valuable service will
be sent to Mr. Pickett on behalf of the staff.
At Meeting '6/79, the Committe~ was invited to hold the June 13th meeting at the
Caledon home of Mr. Breen. The June 13th meeting will now be held at the Authority
office and the meeting scheduled for July llth at Mr. Breen's residence.
MINUTES
The Minutes of Meeting '6/79 were presented.
Res. U8l Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The Minutes of Meeting '6/79, as presented, be adopted as if read.
cARRIED ,
B-l39 -2-
SECTION I .'
'.'
.
'. ' -
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION:OF THE
AUTHORITY'AND RECOMMENDS THEIR ADOPTION:
1. SUPPLEMENTARY PROJECT TO THE INTERIM WATER AND
RELATED LAND MANAGEMENT PROJECT: 1979-l98l FOR
THE DREDGING OF THE KEATING CHANNEL, DON RIVER
A staff communication and project brief wer.e presented having regard to the
proposed dredging of the Keatl.ng Channel.
Res. #182 Moved ba: Dr. T.H. Leith
Seconde by: ,Mrs. J .A. ~rdner
RESOLVED THAT: The Supplementary Project to the Interim Water and Related
Land Management project 1979-l98l for the Dredging of the Keating Channel,
Don River, as appended as Schedule "A" of these Minutes, be adopted; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT the following action be taken:
(i) The Municipality of Metropolitan Toronto be requested to approve
the Supplementary Project, be designated as the benefiting
municipality and contribute 45% of the Authority's share of the
works undertaken in the years 1979 through 1985:
(H) The Province of Ontario be requested to approve the Supplementary
Project and to provide a grant of 55% of the Authority's share of
the works undertaken in the years 1979 through 1985:
( Hi) The Ontario Municipal Board be requested to approve the Supple-
mentary Project pursuant to Section 23 of The Conservation
Authorities' Act;
(iv) The implementation of the Supplementary project be conditional
upon the other participants - the Toronto Harbour Commissioners and
the Federal Government - approving their share of the funding;
(v) Authority officials be authori~ed to take whatever action is
required in connection with the Supplementary proje~t, including
the execution of any necessary documents,
CARRIED;
SECTION II
"
-
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
2. SOIL CONSERVATION SOCIETY OF AMERICA -
THIRTY-FOURTH ANNUAL MEETING: JULY 29-AUGUST 1, 1979
CHATEAU LAURIER, OTTAWA, ONTARIO
-Attendance at
Res. U83 Moved by: Mrs. J.A. Gardner
Seconded by: E.H. Card
RESOLVED THAT: The following members be authorized to attend the Thirty-
Fourth Annual Meeting of the Soil Conservation Society of America in Ottawa,
July 29-August l, 1979: Mrs. F. Gell: Mrs. J.A. Gardner; R.G~ Henderson;
E.H. Card: Mrs. S. Martin: J.S. Scott; C.F. Kline; Dr. T.H. Leith; and
THAT their expenses, in connection therewith, be paid.
CARRIED;
3. FINANCIAL REPORT AND ACCOUNTS
-April, 1979
Mr. Scott presented the Financial Report and Accounts "for the month of April,
1979.
Res. 1184 Moved by: J.S. Scott
Seconded by: Mrs. J .A. Gardner
RESOLVED THAT: The Financial Statement for the month of April, 1979, be "
-3- B-140
received; and that payment of the Authority Accounts, in the amount of ,
$650,378.45, being (a) Current Expenditures - Wages and Salaries $285,349.66:
Mater~als and Supplies $207,662.34; (b) Capital Expenditures - Wages and
Salaries $22,493.92: Materials and Supplies $l34,872.53, be approved.
CARRIED;
4. USE OF EMPLOYEE-OWNED TRUCKS
A staff communication was presented advising that, at Meeting #6/79, the
Executive Committee authorized the increase in rates payable to staff using
their own vehicles to l3-3/4~ per kilometer, effective June l, 1979.
A recommendation should have been included to increase the rate payable to
staff required to transport with their own trucks bulky or heavy equipment or
to trail a piece of Authority equipment, to l7-l/4~ per kilometer.
Res. 1185 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: Where an employee is required to transport bulky or heavy
equipment, or is required to trail a piece of Authority equipment with his
own truck, he shall receive a travel allowance of l7~l/4~ per kilometer,
effective June l, 1979: and
THAT authorization to pay travel allowance under this regulation shall be
obtained in each individual case from the Administrator responsible.
CARRIED;
5. REPORT 11/79 - HISTORICAL
SITES ADVISORY BOARD
Report 11/79 of the Historical Sites Advisory Board was presented.
Res. #186 Moved by: M.D. Lipton, Q.C.
Seconded by: C.F. Kline
RESOLVED THAT: Report #l/79 of the Historical Sites Advisory Board, as
amended, be received and the Plan of Development: Black Creek pioneer Villaqe,
dated May 9, 1979, be appended as Schedule nBn of these Minutes; and
THAT the following action be taken:
((!l) A Visitor Centre at the Black Creek Pioneer Village, to consist,
in the f~r~t phase of approximately l~,OOO square feet, and providing
accommodatl.on for ~tudent assembly, tl.cket taking, washrooms, cafeteria
and snack bar, gift shop and sales outlet, storaqe and mechanical
consistent with the principles established for the Visitor Centre
be approved; ,
(b) The Metropolitan Toronto and Region Conservation Foundation be
requested to establish a fund-raising programme for the Black
Creek Pioneer Village Visitor Centre, and that the staff be
directed to prepare the necessary display materials for the
Foundation: and further
That concurrently with the preparation of the display for the
Foundation, a building committee be established to conduct a
study regarding:
(i) the final design
( ii)' the phasing, if any
(Hi) preparation of a budget
and that negotiations be carried out with Raymond Moriyama or
other architects, as the building committee may decide, to deter-
mine final design and costs;
(c) The location of the workshop and maintenance area be confirmed
in the southeast corner of the Black Creek pioneer Village
property, as recommended in the 1964 Plan of Development;
(d) The staff investigate the means of enlarging the secured area of
the Village to include the valley lands south to Shoreham Drive.
CARRIED ;
B-l41 -4-
6. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Borough of Scarborough
To construct a storm sewer outfall into the Highland
Creek in the area south of Military Trail, east of
Highcastle Road
A staff communication was presented advising that an application has been
received from the Borough of Scarborough for a permit to construct a storm
sewer outfall into the Highland Creek at the ,above location.
Res. il87 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of the
Borough of Scarborough, be received: and
THAT the application of the Borough of Scarborough for a permit to undertake
the construction of a storm sewer outfall into the Highland Creek in the area
south of Military Trail, east of Highcastle Road, Borough of Scarborough
(Highland Creek watershed), be approved, subject to:
(a) All gabion works being preceded by a filter mat or a 6"-l2" layer
of crushed stonel
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Metropolitan Toronto
Parks Departmentl
(c) A silt trap being installed at the outfall during construction in
order to minimize the silting of the creekJ
(d) An easement being obtained to enter and do work on Authority-
owned landJ
(e) The gabion baskets on the bank of the creek being keyed into the
bank.
CARRIED;
7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Markham
To replace bridges carrying l8th Avenue and the 9th
Concession Road over the Little Rouge River, Lots 25 &
26, Concession VII, and Lot 20, Concessions VIII .& IX,
Town of Markham (The Regional Municipality of York)
A staff communication was presented advising that an application has been
received from the Town of Markham for permission to replace two existing
bridges crossing the Litt~e Rouge River at the above location.
Res. US8 Moved by: Mrs. F. Gell
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of the
Town of Markham, be receivedJ and
THAT the application of the Town of Markham for a permit to undertake the
replacement of the bridges that carry l8th Avenue and the 9th Concession Road
over the Little Rouge River, in the area of Lots 25 and 26, Concession VII
and Lot 20, Concessions VIII and IX, Town of Markham (The Regional
Municipality of York), Rouge River watershed, be approved, subject to:
(a) All rip rap works being preceded by a filter mat or a 6--12-
layer of crushed stone:
(b) All areas disturbed due to construction being restored to the
satisfaction of the AuthoritYJ
(c) Every effort being made to minimize the silting of the creek
during construction.
CAJUUED;
-5- B-14 2
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Borough of Etobicoke
To cqnstruct a pedestrian bridge across Renforth Creek,
a tributary of the Etobicoke Creek, as it flows through
Bloordale Park, west of Highway #427, north of Bloor St.
A staff communication was presented advising that an application has been
received from the Borough of Etobicoke for a permit to construct a pedestrian
bridge across the Renforth Creek at the above location.
Res. ,11189 Moved by: E.H. Card
Seconded by: M.W.H. Biggar
RESOLVED THAT: The staff communication, together with the application of the
Borough of Etobicoke, be received: and
THAT the application of the Borough of Etobicoke for a permit to undertake
construction of a pedestrian bridge across the Renforth Creek, a tributary of
the Etobicoke Creek, as it flows through Bloordale Park in the area west of
Highway #427, north of Bloor Street, Borough of Etobicoke (Etobicoke Creek
watershed), be approved, subject to:
(a) All gabion and rip rap,works being preceded by a filter mat or
a 6"-12" layer of crushed,stone;
(b) The gabions on the bank of the creek being keyed into the bankJ
(c) ,Every eftort being made to'minimize the silting of the creek
during construction:
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARR:IED;
9. APP~ICATION FOR PERMIT UNDER ONT~IO REGULATION 735/73
Yelodim Limited
To construct a storm sewer outfall into the Etobicoke
Creek just south of Derry Road, east of Dixie Road,
City of Mississauga (The Regional Municipality of Peel)
A staff communication was presented advising that an application has been
received f~r permission to construct a storm sewer outfall into the Etobicoke
Creek at the above location.
Res. U90 Moved by: E.V. Kolb
Seconded by: M.J. Breen
RESOLVED THAT: The staff communication, together with the application of
Yelodim Limited, be received: and
THAT the application of Yelodim Limited for a permit to undertake the
construction of a storm sewer outfall into the Etobicoke Creek in the area
just south of Derry Road, east of Dixie Road, City of Mississauga (The
Regional Municipality of Peel), Etobicoke Creek watershed, be'approved,
subject to:
(a) All rip rap works being preceded by a filter mat or a 6R-12" layer
of crushed stone:
(b) Every effort being made to minimize the silting of the creek during
constructionJ
(c) The steep bank to the valley floor being properly stabilized and
covered after construc~ion;
(d) Sanitary manhole number 1A being equipped with a watertight cover,
(e) All areas disturbed due to construction being restored to the satis-
faction of the Authority and of the City of Miss'issauga.
CARRIED;
B-l43 -6-
lO. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 ..
280277 Ontario Limited -&- Pine Tree Development Co. Ltd.,
To con~truct a vehicular bridge to carry Glen Shields Ave.
across the ~est Branch of the Don River, ,north of Steeles
Ave., west of Dufferin Street, Town of Vaughan (The
Regional Municipality of York)
A staff communication was presented advising that an application has been
received from 280277 Ontario Limited -&- Pine Tree Development Company Limited
for permission to construct a vehicular bridge across the w~st Branch of the
Don River at the, above location.
Res. #19l Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff communication, together with the application of
280277 Ontario Limited -&- Pine Tree Development Company Limited, be received;
and
THAT the application of 280277 Ontario Limited -&- Pine Tree Development
Company Limited for a permit to undertake the construction of a vehicular
bridge to carry Glen Shields Avenue across the West Branch of the Don River
in the area north of Steeles Avenue, west of Dufferin Street, TOwn of vaughan
(The Regional Municipality of York), Don River watershed, be approved, subject
to:
(a) All gabion and rip rap works being preceded by a filter mat or a
6"-l2" layer of crushed stone:
(b) Every effort being made to minimize the silting of the creek
during constructionr
(c) All areas disturbed due to construction being restored to the
satisfaction of the Authorityr
(d) The Town of Vaughan being satisfied with the detailed design of
the bridge structure and the channel works.
CARRIED r
ll. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
HaWIDan Plymouth-Chrysler Incorporated
To divert a section of a tributary of the Humber River,
Part of Lot 3, Concession VII, Town of Caledon
A staff communication was presented advising that an application has been
received from HaWIDan Plymouth-Chrysler Incorporated for permission to divert
a section of a ,tributary of the Humber River located on the east side of
Highway i50, south of the Village of Bolton.
Res. #192 Moved by: Mrs. F. Gell
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of
Hawman. plymouth-Chrysler Incorporated, be receivedr and
THAT the application of HaWIDan Plymouth-Chrysler Incorporated for a permit to
divert a section of a tributary of the Humber River on Lot 3, Concession VII,
TOwn of Caledon, be approved, subject to:
(a) All work being undertaken in accordance with drawings submitted, as
prepared by A. Kalaycioglu:
(b) The applicant complying with the existing by-laws, and regulations
for the Town of Caledon:
, ,
(c) All work being carried out to the satisfaction of the Authority:
(d) Approval being received from the Ministry of Natural Resources;
(e) Every effort being made to minimize silting of the creek.
CARRIED,
-7- B-144
12. DATA PROCESSING
A staff report was pr~sented advising that consideration has been given by the
staff to the use of data processing systems in the Authority's operation. An
independent consultant ip the field, Gordon Mo1nar & Associates Limited, has
been contacted and discussion held as to the type of information requi~ed to
enable the Authority to make the proper decisions regarding effective use of
data processing equipment. A study of the Authority's operations, at a cost
of $lO,920.00, is required to analyze current and future needs.
Res. 1193 Moved by: M.W.H. Biggar
Seconded by: E.H. Card
RESOLVED THAT: The staff report having regara to the use of data processing
systems in the Authority's operation be received: and
THAT the subject be referred to the Finance Sub-Committee for consideration
and report to the Executive Committee.
CARRIED;
13. THE REGIONAL MUNICIPALITY OF DURHAM
-Request for Permanent Easement
A staff communication was presented advising that a request has been received
from The Regional Municipality of Durham to provide a permanent easement for a
watermain required on the north side of Bayly Street, west of Valley Road in
the TOwn of Aj ax .
The proposed easement affects Authority-owned land known as Part of Lot 13,
Concession I, Town of Ajax, designated as Parts 3 and 4 on Plan 40R-4993.
Res. 1194 Moved by: Mrs. F. Gell
Seconded by: M.J. Breen
RESOLVED THAT: A permanent easement for a watermain be granted to'The Regional
Municipality of Durham, required on the north side of Bayly Street, west of
Valley Road in the Town of Ajax. Said easement is shown as Parts 3 and 4 on
Plan 40R-4993. The Authority-owned land affected is Part of Lot l3, Concession
1, Town of Ajax, The Regional Municipality ,of Durham. Said easement to be
granted for the nominal consideration, of $2.00, subject to The Regional
Municipality of Durham being ~e~ponsible for carrying out and paying all legal,
survey and other costs involved in the transactioni and
THAT the appropriate Authority officials be authorized and directed to.sign
the necessary documents to give effect thereto~
CARRIED,
14. TOWN VAUGHAN
-Disposal of Surplus Authority-OWned Land
Res. 1195 Moved by: E.V. Kolb
Seconded by: M.D. Lipton, Q.C.
RESOLVED THAT: A 53.201 acre section of the former Estate of George Groves
property, being Part Qf Lot 32, Concession x, Town of Vaughan, The R~gional
Municipality of York, locat~d west ,of the Ontario Hydro-owned property, be
considered as surplus to the requirements of the Authority; and
THAT the Secretary-Treasurer be directed to advertise this land for sale by
public tenderi
AND FURTHER THAT The Chairman and Vice Chairman of tpe Authority and the
Chairman of th~ Flqod Control and Water Conservation Advisory Board be
appointed a committee to open the tenders and'report to the Executive Committee
with a recommendation.
CARRIED,
15. BOROUGH OF SCARBOROUGH
-Disposal of Surplus Authority-Owned Land
Res. 1196 Moved by: E.H. Card
Seconded by: J.S. Scott
B-14 5 -8-
RESOLVED THAT: A 0.52l acre, more or less, section of the former W., M.G. and
G.A. Hozy property, being Part of Lot l8, Concession II, Borough ofScarborDugh
The Municipality of Metropolitan Toronto, located on the northeast corner of
Progr~ss Court and Markham Road, be declared as surplus to the requirements of
the Authority: and
THAT the Authority request approval of the Minister of Natural ,Resources ih
accordance with the provisions of Section 43 of the Expropriations Act, and
the issuance of an Order-in-Council under Section 20(c) of T~e Conservation
Authorities Act, R.S.O. 1970, Chapter 78 as amended, authorizing sale of the
subject property to the Armenian General Benevolent Union of Canada Inc. at,a
sale price of $75,000.00;
AND FURTHER THAT the Authority not object to the property being filled to
grade level and being rezoned to conform wi~ the zoning on the adjacent lands;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED:
16. TOWN OF CALEDON
- Glasgow Road' - Village of Bolton
A staff communication was presented advi~ing that at Council Meeting held on
March 26, 1979, the Town of Caledon adopted the following resolution:
"RESOLVED that whereas the maintenance of Glasgow Road is becoming
increasingly expensive and that road maintenance is very difficult
largely because of an impossible drainage correction problem, be
it resolved:
That the Town of Caledon request M.T.R.C.A. to begin a procedure to
do a study on the area to determine the best way to modify the river
channel in order to provide an improved road bed and drainage system.-
Res. #197 ' Moved by: E.V. Kolb
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Authority advise the Town of Caledon that it does not con-
sider it necessary at this time to carry out remedial work on the Humber
River at Glasgow Road in Bolton: and
THAT the Town' of Caledon be, further advised that the Authority will be
carrying out minor drainage works on the valley wall under its Erosion Control
Programme in The Regional Municipality of Peel scheduled for 1980; and
FURTHER THAT the staff be requested to assist the Town of Caledon in
considering alternative means of widening Glasgow Road satisfactorily.
CARRIED;
17. HARBOUR CLEANING
A staff 'communication was presented having regard to a position paper on
Harbour Cleaning prepared by the Toronto Harbour Commissioners., The paper
deals exclusively with pollution clean-up, oil and debris. It does not deal
with maintenance dredging.
Res. 1198 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Toronto Harbour Commissioners' Position Paper on Harbour
Cleaning be'received: and
THAT the Authority advise the Toronto Harbour Commissioners that it regrets
there is no role for the Authority in participating in this work.
CAlUUBD;
18. REPORT #1/79 - OFFICIAL OPENING SUB-COMMITTEE
- Kortright Centre for Conservation
Dr. Leith presented Report *l/79 of the Official Opening Sub-Committee -
Kortright Centre for Conservation.
Res. #199 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
D'I:'C!nT"'Ii'n ",u..",_ gQnn~~ .lJ7Q n~ ~hg Official OOeninQ Sub-Committee -Kortright
-9- B-l46
Centre for Conservation, as amended, be received: and
THAT the following action be taken:
.
(a) OFFICIAL INVITATION
The preliminary "Official Invitation" be approved:
(b) GROUP MAILING LIST
The preliminary "Group Mailing List" be acceptedJ
(c) PROGRAM AND PLATFORM PARTY
The preliminary "Program" and "Platforni Party", as amended, be
approved for use for the Official Opening of the Kortright Centre
for Conservation. .
19. REPORT #1/79 ~IED;
-CONSERVATION FARM SUB-COMMITTEE
Mr. Kolb presented Report '1/79 of the Conservation Farm Sub-Committee.
Res. '200 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED ~AT: Report '1/79 of the Conservation Farm Sub-Committee, as amended,
be received, and
THAT the fo~lowing' action be taken:
(a) The Glassco and Lake st. George farms not be used by the public or by
groups, for interpretive purposes, in their present condition;
(b) Regular major maintenance be carried out by the Authority ~rom revenue
received from farm renta~:
(c) Revenue from farm rental reflect the market value of the crop land and
the residence. 'The barns, other farm buildings and pasture be charged
at nominal rates:
(d) Policies' consistent with those developed for the Albion Hills
Conserva,tion Farm apply to the farms at Lake St. George and GlasscoJ
'(e) The staff review the Authority policies related to the Albion Hills
Conservation Farm and investigate the feasibility of incorporating these,
or similar pOlicies, into an agreement for the operation and visitation
of the Glassco and Lake St. Geo~ge farms;
(f) The Committee Chairman investigate with the Executive Committee the
availability of funding for initial improvements to the Glassco and Lake
St. George farmsJ
(g) The staff be requested to prepare estimates for the required initial
maintenance and repair of facilities at the Glassco and Lake St. George
farms.
CARRIEDJ
20. QUOTATION '79-26
-Hammer Knife Mower
A staff communication was presented advising that the following quotations
have been received for the supply and delivery of one hammer knife mower with
trade:
Nobleton Farm Service $1,842.54
Don Vallance Equipment .2,193.50
W.R. Buckle Equipment Limited 2,537.70
Duke Lawn Equipment Limi ted 2,861.19
The above prices include Federal and Provincial
Sales Taxes.
Res. 1201 Moved by: E.V. Kolb
Seconded by: Mrs. J .A. Gardner
B-l47 -lO-
RESOLVED THAT: The quotation received from Nobleton Farm Service for the
supply and delivery of one hammer knife mower, with trade, in the sum of
$l,842.54, including Federal and Provincial taxes, be accepted: it beiriq the
lowest quotation received. "
CARRIED:
21. MILNE CONSERVATION AREA
-Town of Markham ' , .
A staff communication was presented advising that at Meeting of Council held
March l3, 1979, Council approved a motion from the Parks & Recreation Director
recommending that the Town assume the operation and maintenance 'of the Milne
Conservation Area. The following resolution was received from the Town week
of May 2l:
"Moved by C. Bell
Seconded by B. Sherwood
THAT the Town of Markham assume the operation and maintenance of
the Milne Conservation Area for a three (3)- year period, 1979,
1980 and 1981, subject to the following:
(a) The Metropolitan Toronto and Region Conservation Authority
transferring to the Town the funds received from the
Ministry of the Environment, i.e. $7,800.00 in 1979,
$6,200.00 in 1980 and $3,lOO.00 in 1981.
(b) The Town of Markham having the option to continue operating
this area after the three ( 3) year period OR of turning this "
responsibility back to the Metropolitan Toronto and Region
Conservation Authority.
AND FURTHER THAT subject to a Lease Agreement being executed with
the Metropolitan Toronto and Region Conservation Authority, the
beach operation at Milne 'Dam be transferred to the Milne
Conservation Area together with the budget allocation.
, ,
Resolution Carried."
Res. '202 Moved by: Mrs. S. Martin
Seconded by: J.S. Scott
RESOLVED THAT: The ,staff be directed to develop a suitable lease agreement
between the Corporation of the ~wn of Markham and The Metropolitan TOronto
and Region Conservation Authority to permit the Town of Markham to aSSUMe the
operation and maintenance of Authority-owne~ lands known as the Milne
Conservation Area.
CARRIED,
22. PURCHASE OF REPRINTS OF ARTICLES APPEARING
IN THE JOURNAL OF SOIL & WATER CONSERVATION
Res. '203 Moved by: E.H. Card
Seconded by: M.W.H. Biggar
RESOLVED THAT: A suitable quantity of reprints of the following articles,
appearing in Volume 34, 12, March/April edition of the Journal of Soil and
Water Conservation, be purChased:
The Great Lakes - Geology at Work: by Walter M. TOvell -and-
A Framework for Nonpoint Pollution Control - Great Lakes Basin:
by,Murray Johnson and Norman Berg
CARRIED;
23. ADJOURNMENT
On Motion, the meeting adjourned at 12:45 p.m., May 30th.
R. Grant Henderson K.G. Higgs
Chairman secretary-Treasurer
B-148
SCHEDULE "A"
'THE METROPOLITAN 'l'ORON'1'O AND REGION CONSERVATION AU'l'HORIft'
SUPPLEMEN'l'ARY PROJBC'1'
'1'0
THE IH'l'BRIM WATER AND, RELATED lAND
~GEMENT PROJECT 1979 - 1981
POR THE
DREDGING OF' '1'HE KEATING CHANNEL
DON RIVER
MAY 1979
B-149
... "
A SUPPLEMENTARY PROJECT TO
"THE INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT 1979-l98l
FOR THE DREDGING OF THE KEATING CHANNEL - DON RIVER
1. SUBJECT
A Suppleme~tary project ~o the Interim Water and Related Land Management project
by the Metropolitan Toronto and Regi~nConservation Authority describing
additional work to be carried out and the funding required for the work.
2. DETAILED DESCRIPTION
(i) Purpose:
The purpose of this Supplementary project is to provide part of the
funding required to dredge the Keating Channel at the mouth of the
Don River in order to minimize the potential flood hazardJ minimize
pollution to the Inner Harbour; and make the northeast corner of the
harbour usable for shipping.
(11) Backqround:
The Keating Channel is the man made mouth of the Don River where it
empties into the northeast corner of Toronto's Inner Harbour. Each
year about 60,000 cubic meters (m3) of sediment comes down the Don and
deposits in the Keating Channel. Along with the sediment comes
pollutants which are derived from urban development upstream and
adhere to the fine grained sediment which is deposited in the Channel
and to those which are carried on out into the Harbour. The deposition
of this material wi thin the Keating Channel and the Inner Harbour makes
it virtually unusable for shipping. This same siltation restricts the
flow' of flood waters and thus greatly increases the potential for
flooding particularly as a result of ice jams. When it was dredged,
the Keating Channel acted as an effective sedimentation trapJ now
polluted sediments flow directly into the Harbour degrading its quality
for ancillary recreational uses. (A report by the TOronto Harbour
Canmissioners' Engineering ~epartment entitled: "Dredging and Endikement
Project" describes the problems in more detail.)
In 1972, Canada and the United States signed a joint agreement to
improve water quality in the Great Lakes system. One important result
was a complete ban on the open water disposal of polluted dredgeate.
Up until 1974 the Toronto Harbour CoIIInissioners was able to dispose
of the polluted dredgeate in a reasonably economic fashionJ the
__.L."-_~ ...__..:1 _.... ...."'_ ....:__ "'!!!U!!I ..~ 'hi........ +'hA ""a...A....;.:al undAr ~'h.A a.dvaIlC!!ina-
B-l5(,
- 2 - '
fill at the OUter Harbour Headland. However, as a result of the
bsn on open water dumping, the dredging was discontinued principally
because of the high cost of any acceptable alternatives.
(iii) Description of Works:
The disposal in a satisfactory manner of the pollu~ed sediments of the
Keating Channel is the key to a satisfactory solution to the dredging.
The TOronto Harbour commissioners have proposed a new endikement off
the south side of the OUter Harbour Headland built of clean trucked
fill and armoured with rubble. This spit would serve to contain the
polluted dredgeate in order to meet the requirements of environmental
agencies. The location shown is the only location where an endiked
area, of sufficient size to be economical, could be built and serve
as a disposal site for the Keating Channel dredgeate.
To date 400,000 m3 of sediment has accumulated in the area to be
dredged. To dredge this material and the 60,000 m3 that deposit each
year, will require a 7 year phased dredging programme as shQWD on the
following table:
JWount to
Year be DredQ'ed
1979 -60,000 m 3
1980 80,000
1981 120,000
1982 120,000
1983 260,000
1984 120,000
1985 60,000
820,000 m 3
The 7 year programme is required for two reasons:'the first is the
rate of development of the endiked area: it will take seven years to
enclose an area which will acCOlll'llOdate not only the initial 820,000 m 3
but another 15-20 YC:lars of dredgeate as well: and second: the dredging
occurs in a very confined area and equipment must dig itself in on a
gradual basis. The detailed phasing of the operation is contained in
the -Dredging and Endikement project" report prepared by the Toronto
Harbour Commissioners. In brief te~s, ~he material will be dredged
with a derrick fitted out with a clamshell bucket and loaded into
bottom dumping scows which will be taJcen by tug to the disposal site
and released.
It is also important to recognize that the dredging requirement will
not be complete after 7 years. 3
60,000 m per year will continue to
accumulate and arrangements must be made to solve that continuing
__...!I~___"""'_...I..-J__ __ """"-'_..L.. ..lL..._...!I___._ _____.___ .!II_ ____
B-l5l
- 3 -
3. COST/FINANCING
The cost of this project is based on the estimates of the Toronto Harbour
Commissioners and will be spread over 7 years as shown below. The costs have
been based on $5 per cubic meter and include engineering, dredging, surveying,
environmental monitoring, reporting and any special protection required at the
,
disposal site. No cost is anticipated for the construction of the endikement
since a ~5 per truck load disposal charge made by the Toro~to Harbour
Commissioners should cover all costs associated with this part of the work.
The dredging wi~i be carried out by the Toronto Harbour Commissioners as the
, '
proponent; hOJliever, it is recognized that,the'problem is not their entire
responsibility and that several areas of the community will benefit from the
work. A cost sharing formula has been proposed, therefore, on the following
basis:
The Toronto Harbour commissioners - one third of total
Government of Canada - one third of total
The Metropolitan Toronto and Region
Conservation Authority - one third of total
ANNUAL COSTS
Cost for each
Year, Total Cost Participant
1979 $ 300,000 $100,000
1980 $ 400,000 $133,000
1981 $ 600,000 $200,000
1982 $ 600,000 $200,000
1983 $1,300,000 $433,000
1984 $ 600,000 $200,000
1985 $ 300,000 $100,000
The Authority will fund the project on the following basis;
Province of Ontario 55"
Authority Share
(Metropolitan Toronto) 45"
B-152
- 4 -
OVer a 7 year period this means:
.
ANNUAL AUTHORITY FUNDING
Metropolitan Province
Toronto of Ontari"
Year Portion Portion :l2Y!
1979 $ 45,000 $ 55,000 $ 100,000
1980 $ 59,850 $ 73,150 $ 133,000
1981 $ 90,000 $110,000 $ 200,000
1982 $ 90,000 $110,000 $ 200,000
1983 $194,850 $238,150 $ 433,000
1984 $ 90,000 $110,000 $ 200,000
1985 S 45.000 S 55.000 S 110.000
'1'O'l'ALS $614,700 $751,300 $1,366,000
The Municipality of Metropolitan Toronto is designated as the benefiting
municipality.
The funding provided as part of the current Interim Water and Related Land
Management Project are ccmmitted for flood and erosion control works and
acquisition. This Supplementary Project will pr~vide the funds required in
order to be able to carry out the dredging work proposed.
4. REVIEW
The Toronto Harbour Commissioners, as the implementing agency, will provide
t:he Authority with regular progress statements on Which payment will be based.
At the end of each year the entire dredging and disposal operation will be
reviewed as to accomplishments of the previous year and the ext:ent: of the
underta1cing proposed for the subsequent year with a view to cost-s.ving
Wherever ppssible. The review will be carried out in conjunction with the
Municipal! ty of Metropoli tan Toronto and the Province of ontario.
. '
B-l53
SCHEDULE "B"
, "
PUN OF DEVELOPMENT
BLACK CREEK PIONEER VILLAGE
,
. , .
,',TH~ METROPOLITAN TORONTO AND REGION CoNSERVATION AuTHORITY
MAy 91 1979
B-154
PLAN OF DEVELOPMENT
'BLACK CREEK PIONEER VILLAGE
1. INTRODUCTION
The Executive Committee of the Authorit~ at its Meeting #20/78,considered a
communication from The Metropolitan Toronto and Region Conservation Foundation
recommending that the Authority consider requesting the Devonian Group of
Charitable Foundations for financial assistance for the Black Creek Pioneer
Village Visitors' Centre. A design concept for the proposed Black Creek Pioneer
Village Visitors' Centre had earlier been considered by the Historical Sites
Advisory Board and endorsed for forwarding to The Metropolitan Toronto and
Region Conservation Foundation. The Authority's Executive Committee and the
Foundation did not endorse the design concept. In view of this, in considering
the recommendation of the Foundation,the Executive Committee took the following
action:
"THAT the staff be directed to prepare a report for consideration by
the Executive Committee, dealing with the concerns expressed in the
consideration of the concept for the Centre, prior tQ the Executive
Committee acting on the recommendation of the Foundation."
The concerns expressed were as follows:
· - the estimated cost was considered to be excessive in relation to the
total investment in the Pioneer Village in terms of a fund raising
project
- the cost of operating the Centre and the potential revenues were not
clearly set out
- the relationship of the Centre to an updated Master Plan for Village
development was not fully addressed
- there is an immediate need for improved facilities for food and
shelter for school groups visiting the Village and improved facilities
for the gift shop and snack bar
- although the development of the full facility was not seen as Deinq
feasible or desirable in one stage, it was recognized that the
capability of the Visitors' Centre to be expanded to include additional
facilities to the basic requirements for food, gift shop and shelter
was necessary."
The purpose of this report is to review the plan of development for the Black
Creek Pioneer Village in order to provide a planning context for consideration
of the Visitors' Centre and to review the Visitors' Centre proposals in order
that the concerns expressed can be addressed.
2. BACKGROUND
The Black Creek Pioneer Village began as a project of the Humber Valley
Conservation Authority as the Dalziel Pioneer Museum and the Dalziel Conservation
Area. When The Metropolitan Toronto and Region Conservation Authority was
established in 1957 the work begun in the valley of the Black Creek at the
Dalziel site was expanded south of Steeles Avenue with the restoration of a
qroup of pre-l867 buildings which were existing on site.
2.1 Report on the Pioneer Village - 1964
A comprehensive report on Pioneer Village was adopted by the Authority'in 1964.
The major recommendations of the report, dealt with the followinq matters:
- The Metropolitan Toronto and Regio~ Conservation Foundation was
requested to explore means of o~taining fin~ncial assist~nce for the
completion of the Pioneer Village as a Centennial project
- a new fee structure for the Village was ad~pted
.
- the area north of Steeles A~enue west of Jane Street was desiqnated as
an agricultural community and it was recommended that a hardwood bush
and field crops appropriate to pre-Confederat~on be est~l~she~
B-155
- 2 -
,_ that the Dalziel Barn be restored to its original condition as a stock
barn
_ that the Dalziel House be restored when it becomes available
_ that a sawmill be established at or near the original site of the mill
north of Steeles Avenue
_ that the extension of Pioneer Village be undertaken and that the
following buildings, in order of priority, be considered:
. tavern
. printing shop
. manse and driveshed
. weaver's shed
. apothecary shop
. gunsmith'S shop
. cooperls shop
. woodworking shOp
. sawmill
. dwelling
_ that the Authority progressively provide heat to all the major restored
buildings, that the restored area be fenced
_ that the Village collection be limited to the provision of the necessary
articles for exhibiting in the present restored buildings together with
future proposed restorations
_ that the Authority provide staff for the enlargement of the education
program at Pioneer Village
- that the Authority establish the necessary utilities (hydro, water and
sewer connections) to service the Village.
2.2 Master Plan for the Black Creek Conservation Area - 1964
At the same time that the Pioneer Village's development was being reviewed, the
Authority adopted a Master Plan for the Black Creek Conservation Area which is
the site of the Village. The Master Plan dealt with the development of the site,
traffic, both vehicular and pedestrian, location of the workshop, the adminis-
trative building, a reception area and landscape plantings. The major
recommendations of the Master Plan were:
_ the development of the main vehicular entrance to the Village off
of the Murray Ross Parkway and the location of the parking area to
the south of the vehicular entrance
_ the development of the reception area which would comprise the proposed
reception centre with displays, auditorium, offices, lavatories and the
entrance court which was to be an open area in front of the reception
centre. The entrance court would provide a transition point between the
car and the Village and a collection point where families and friends
could meet, tours could gather and visitors could rest before and after
the tour of the Village
_ a workshop and service area fronting on Murray Ross Parkway
_ a pedestrian underpass was recommended to connect the Dalziel area and
the Village under Steeles Avenue.
Figure 1 shows the Master Plan as it was adopted.
2.3 Updated Master Plan - 1968
An addition to the Master Plan was adopted in 1968 dealing with the valleylands
south of the Village to Finch Avenue. This plan made provision for:
_ foot access from the restored area, York University and the residential
areas into the valley
- exclusion of all vehicular traffic from the valley,
- a valley walkway system
_ an area adiacent to Finch Avenue was reserved for the future development
- 3 - B-l~6
at the site of the,one time,Indian Village
- the construction of a Visitors' Centre was recommended
- the construction of the parking area recommended in the original Master
Plan providing 750 parking spaces was recommended.
2.4 Report on Black Creek pioneer Village - 1969
This report reviewed the recommendations made in the 1964 report and reported on
the progress. The recommendations of the report included the following:
_ policy adopted in 1964 regarding the development and operation of the
Village was confirmed
_ further expansion of the restored area was limited to the completion of
the following:
. print shop
. weaver's shed
. Town Hall
. gunsmith's shop
. and restaurant facilities in the basement of the Half Way House
- the staff was directed to study alternative arrangements for the
development and administration of lands south of Shoreham Drive
- the Authority agreed to continue to subsidize the Black Creek Pioneer
Village within budget limits and a concerted effort was made to make as
many operations as possible self-sustaining
- the office of the senior administrative staff of the Historical Sites
Division was to be located at the Authority Headquarters
- the Foundation was requested to consider the establishment of an
endowment fund for the maintenance of the Black Creek Pioneer Villaqe
- 24 hour security and an improved fire detection system was established
- the Historical Sites Advisory Board was requested to prepare a report on
the feasibility and cost of establishing a pre-l867 narrow-gauge railway
at Black Creek Pioneer Village.
2.5 Summary
The majority of the recommendations made in the reports dealing with the Black
Creek Pioneer Village and the Black Creek Conservation Area have been completed
and the Village operates very much as recommended in the various reports. There
remains the following major recommendations which have not been completed:
- the construction of a Visitors' Centre and reception area
- the maintenance building remains on its original site and has not been
re-located as recommended in the Master Plan
- the valleylands south of Shoreham Drive have not been developed and no
suitable management has been achieved. The valleylands between Shoreham
Drive and the southerly limit of the Village have been developed as the
Peacock Woods and are managed by the Authority
- the Indian Village Site remains undeveloped
- the small-gauge railway has not been pursued
- the restorations which remain to be completed are the Richmond Hill Manse;
the sawmill, the Sawyer's House, the Cooper's Shop and the conversion of
the Dalziel area to a stock barn and farm.
3. DEVELOPMENT AND USE OF THE BLACK CREEK PIONEER VILLAGE
The development at the Black Creek Pioneer Village, both the restoration and
the area development, has progressed in an orderly fashion over the 22 years
since the first visitors came to the Dalziel Pioneer Museum. There has been a
very marked relationship between the grow~h of the Village in terms of numbers
of restored buildings and growth in attendance. In 1958 there were approximately
17,500 visitors to the Dalziel Museum and attendance has ~teadily cl~mbed to
FIGURE 1 'I
.....
U1
-....J
---
I
--
~
I
MASTER PLAN
BLACK CREEK PIONEER VILLAGE
AS ADOPTED 1964
1. PARKING AREA
2. RECEPTION CENTRE
3. WORKSHOP
':,"':";'" ':1,:, 'l,r'srT:' TliNDERPASS
. , ~ l'.l 0:
. I 15 " III ' 8 m
I I I "'" ~ ' i .., ., ,
. 'Ill ~ I 1:11 n ' ,
.. , 'j....: ,., j .-,.. ,. . r i ~ ~ ;.... ,.. ~. ..,.... T' .. ~ !' i .. ., i !: ' r ~ ; . T' f - , ~ ' " 00
-..-- --- I.---~- -H~il,._~-:-I_~ .Ji--l'-i---- --..~.-I;=-:gl----~I.-!.. --..
. . .~ i · ~ = ." .11:i~ ~~I I i5 i:!
,,:! '!!j B z: III ~ I ~ fl! ti ~ ~ e; B g;o;l ~ ,; w
, ! B Ii! a III I [.0 ~ L:li "5::) to III ili !2 ,a I'" III III Ji
, ,,' "'QZ~ci'1 ~ foo" tl "'... 6 III "l::1 '" Ii! 8 !i!
OZiI: .., CD t-4 Z III I N en = en
o. 8C .!i!,._..__oo_ ~--I::~-I--'III-__.::L_-!i--L~!!I--2o--;;--_._-~~,-o""" _.,1
I ' Ii! ~ .. III ti 1111 n ti ~ o:t: z -;fi... 1 .. 0 .1 z =.. I
'... '5111e;"'~ if'" [.0 ~ ' t t!~ eell ...~"'.
~,,;;,.iI .. .."" ~ H h' . ~ ~.! ~"~ ~ fi E e". ~ ~. B ~, ~
3:0000 . -_ __ _1
. ' : ' I .. ..
I" I"
... ., ,-I .
. I ::: : '. r ..' . . .
...~-l -'
" ,;, ::,:-',': IILACI CREEl PION ERVI !.AGE
, " .., J>; rENDAI CE RE TED A'1"I'EN ANCE
300,000 ~ ......... ~ -
.' . . , 19 7-197 ~ $2.50 ~
00 , .. I $3 00
I . '"
_: '; . : _': : .: . FIC URE 2.. , ,
.., .
275-000 '..' , .:" 00 .' - m S2,01
. ~. .. .. ... .
- . -. ... . . - .. . -. .. . .. .. ..
..- .. ... - . . . . - . . . -. .-
. . "of . .. .. -... of . -- ., . .-. - -. ... . .. .
. '0- t_ . ... .... . _. ... . _.
. . .-. . .. ....-.. --.' .. . . .. .
::50000.. : ',:':: :: ~:;: ':::: . :, ":' .. ,: ',' , " - $1.71 .
~. ... ...._. .0 _ _. . . . _ .. . .. . . ~ . ." .
. ... ... ........ ... -. ..... .- . .. - ... .
" -:,'-:.::~. :~': ::,:', .:.::, ',:: ::, ::' ,:'," " ,.. -I '
.., .. - ......... .. ... .. ... ...... ., .
.. .... ... . . ..... . . .
22'5-000 ,': :':1.':.1' ::1 i:"-- :1' <' 'I' ': 1 ' -:' , HI'
.. ... .. ., ... .... .. ... .. .. .
.,. . . .-. .. . ..... .. _.. .... .
..: ' :: ' , :: :', :::'-:','::'. , ' ," :. '$1.5 '
- ,.. . -........ ..-. .... ... . .. ... ..... . . . . . . .
.. ...... _.. ...0 ... . ... .. . .
..0 .... ... . _. .... .. _. ... _ . .
. ....0 _ .
~OO.CCC , ' ,:, '.. 00" :'.. " : 00 . ;- - i- ------------ --~-~ ---~-~ -- -==-~ ~~~- ---~-=----- n_-__ --
.... ... -.. . .. . . . .
-...... '" .. . .... .. . .....- .. .. .... . . -.. .. .. . .
... .....- .. ................. ... .. . ..
. . . .. -... . . . . . . .. .... ... .
.. . - . . ......... ... .. . ... ... .. . . . . . . . . .. . .
. - .. .. . . :.o... ..... ... ...... .. ... ..... " . . - . . . .
. .... ...... _0.... '" ... .
:75-OOC----,:~.--:-1 :-- - :::.:=::-: :~:: >.-- :-~- 'Q-.: ,: 'j - /----, ,
......... ..... . n.. . ... .. ..... . _. .
. .. -.. - .. ..... . .. . . . ... .. _. - ... ... - .. . .. ... " . .
.. -.. ... . -... ...... .... ......... ........ ... ..... - .. ... .
... ...-.--,-... ..-. ---... .-... ..~. ..-.. ......... -... .... . . .. ... .
, , '.'::::--.:' '~:':: -:':::: .,:,:: ~:;: ,:::.. :,~:- ::- $1.0 ''- " . '::,' "
:SO-occ ----:-: ..., ':":'. ::.' :':: ':Jt1' , ~ l l l~
.. .. ....... .... .... .. .., .
. .... . . ............... . .
... ... .. . -. .. -.. . " .. .
.. . ............. ... ... .. .
, ' . .' - .' "... ''1' .. ..' ., . .. . " , " . , , - ". . ,
: ,', ,: :, ,-:.:' :::: ::!: :: : ' :, ..::, :, , - " , : ,',' , ' .
:25.000 : .1'.:1:;' .:: ;::; '~;v" ":"'1::; .,: :'., , , ;, , , ' r'l~n'l
.. ......... ...... .... .. .
.. ... ....... I. . ...... ... .... .. . . .
. .. t... ... .. .... 1 .... . '. .
. . -. . . .... ., t. . '" . ... .. .... ... . .
:oo~-~. ' , 'IJ: : . ~ ~:rn. <:L' , . - ; .>T~.I { . "1-- ,----- -c~c- c-__ "c~~,__~_ .c_,_~~ ~~~- ----:-~ -~ -- _.0._
.... ... .. " ... .. . I . ... I . .. .. " .....
. '" '" .. I." .... .. .. I .. ... .. .. .
. ..... .... . .. .... .... '" . t.. .... .
..., .. . " I. .... '" .... .
. . .. ""1. ... ... . ,. . .
u75-{)oo' -7-' . , ' ~~...:..:.." '" - -' -- ~ ~ - -- ~ ----~- --- ~~-
....' " , : :' ,":' " , SCHOO TOUR!
, ,,' , " "','" , ." -- -
. ," ,,' 00 , ,,'..,.., ,__ ..........,
, :' ':. ...' . ,,: ,:' ,:. ',;,,00 / r-..... _
.,. .. '" " .. ., 1""""'-.. ......-
. ... ... -
- - 50 000 --- -- ---.. -- --- --- ---=- ...:..:..:.. .:..--.:. - - -./- --- -- - -- - ___I --- .-- .-.- ' ... --."
I .. . ~
1 " '/ .
'. .
'.2500~ ..----- .,.., y ~.- --- "-';;'- .-... ,-,1/ .-- "- .,:, -.-- . .- u, --., -.-- --. .,-- ..,. .. .'
. / /1 ' RAt.,. I'prlGRi MM.:
o 25C.L-- - I _ -- --I I I
1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 196B ICl69 1970 I!UI 197? 1973 1974 1975 1976 1977 1978 1979
B-l59 - 6 -
1978 where the visitation was just under 300,000. The visitation made dramatic
increases following the opening of the Burwick House, the Dickson Hill School,
the Laskey Emporium and the snack bar. There was another major increase in
1967 which was the Centennial year and followed the opening o~ the Half Way House.
Attendance increased dramatically again in 1970 following the opening of the
Roblin's Mill in 1968 and the Town Hall in 1970. There also were periods of
decline following fee increases but in each case, attendance rebounded and
continued to climb within two years. Figure 2 illustrates the growth in
attendance in relationship to the opening of restored buildings. The Figure
also shows the growth in school tours and the craft program. Growth in these
areas is not as dramatic because there is a limitation on the numbers that can
be accommodated.
The relationship between the addition of new facilities and large increases in
attendance is an important consideration in assessing future development at the
Village.
Equally important in assessing future development at the Village are the costs
in operation which have accompanied the growth of the Village and the funds
available for development.
Since 1957 land acquisition and development of the Black 'Creek conservation Area
has cost $l,728,500.00. No land has been acquired since 1967 and area
development since 1975 has been minimal. Land costs and area development have
been funded jointly by the Province of Ontario and the participating
municipalities. Over the same period of time the development and restoration
of the Black Creek Pioneer Village has cost $1,177,647.00. These are the actual
expenditures made on Village building restorations and the acquisition of
Village furnishings. The actual value of the Village restoration cannot be
calculated because a large portion of the value is represented by donations of
buildings and artifacts which have not been valued. A large proportion of the
costs in the Village restoration have been met through donations to the Authority
through The Metropolitan Toronto and Region Conservation Foundation. The
municipalities have participated in a small proportion of the restoration cost.
Accompanying the growth in visitation to the Village,which has paralleled the
growth in the restored area, have been increased revenues and increased
operating costs. Since 1975 the excess of cost over operating revenue has
averaged $103,000.00 per year. The loss sustained each year varies according
to attendance but the general trend is increasing. The excess of cost over
revenue is met through the payment of a Museum Grant from the Province of
ontario (in 1979 $72,000.00) and a levy on the municipalities (in 1979
$67,000.00). The burden on the municipalities has been significantly reduced
by the payment. of the Museum Grant and the addition to revenue of interest from
the Black Creek Grow~h Endowment Fund (in 1979 estimated at $lO,OOO.OO).
In summary, it is clear that the growth of attractions at the Village does
result in increased attendance. It also results in increased operating costs
which,when accompanied by consistent inflation, outstrips increasing revenues
at an increasing rate.
Future development and management of the Village must be directed at offsetting
this trend. Steps have already been taken in 1978 and 1979 in the management of
the Village to achieve economies in the use of staff, energy, and equipment.
Steps have also been taken to significantly increase revenues through the sale
of products manufact'ured by the artisan and demonstrator staff. The revenue
producing capability', as well as the contribution to increased visitation, of
new development at the Village, should be a factor in determining priorities.
4. DEVELOPMENT PROPOSALS
The review of reports prepared on the Pioneer Village set out in Section 2
identified a number of development proposals which had been made for the Village'
and not yet completed. This section deals with these.
4.1 Visitors' Centre
In all of the rep,orts prepared on the Black Creek Pioneer Village since 1964
the necessity and desirability of a facility, variously described as a reception
centre or a visi t:ors' centre, has'been identified. Since 1964 the means of
providing such a facility have been given serious consideration on three
occasions. The most recent of these is the proposal made to the Historical
Sites Advisory Board for a visitors' centre in 1978. A brief description of the
- 7 - B-160
status of this proposal will be of assistance.
At Meeting .lO/74 of the Authority's Executive Committee the staff were directed
to: .
"invite proposals from several architects for preliminary design
of a Visitors' Centre at the Black Creek Conservation Area and
that such centre be so designed that it could be developed on a modular-
phasing principle."
At Meeting #l6/74 the Executive Committee authorized the selection of the firm of
Raymond 'Moriyama Architects and Planners for the design of the Visitors' Centre.
In accordance with Executive Committee instructions a conceptual desiqn of the
Visitors' Centre was prepared and was considered by the Historical Sites Board
at their Meeting il/78, at which time the Advisory Board recommended:
-the design concept for the Black Creek Pioneer Village Visitors'
Centre be endorsed and forwarded to The Metropolitan Toronto and
Region Conservation Foundation for consideration."
In dealing with this recommendation the Executive Committee at its Meeting .3/78
agreed to forward it to the Foundation for review and comment but declined to
take any further action. The Foundation reviewed the proposal and declined to
take any action. The main points of discussion concerninq the Visitors' Centre
proposal were outlined in Section 1 of this report.
The concept for the Black Creek Pioneer Village Visitors' Centre as prepared by
Raymond Moriyama Architects and Planners was designed to be built in two phases.
Phase I of the proposal involved 23,890 square feet and provided for an entrance
area, student assembly area, washrooms, access corridor, gift shop and storaqe,
cafeteria and kitchen, concession area and service and utility area.
Phase II of the proposal provided an administration area, museum space, work-
shOp, two theatres, a dining room, additional washrooms, storage area and a
continuation of the access corridor.
The Executive Committee and the Foundation felt that the cost of the project was
excessive.
The maintenance and operating costs of the facility and the revenues it was
expected to generate were not included in the proposal. A staff study has now
been completed on operating costs and anticipated revenues and is attached as
Appendix 1 of this report. In summary the staff study concludes that without
the addition of the Visitors' Centre, the visitation to the Village is likely
to remain at its present level of approximately 300,000 per year. With the
addition of the Visitors' Centre visitation to the Village could be expected to
increase by approximately 30% at the end of a five year period. The increases
in visitation anticipated would be related to year-round dining facilities,
improved accommodations for inclement weather and winter activities, facilities
suitable for increasing the business volume related to special functions,
particularly weddings, and the attraction of the facility and the capability of
the museum and theatre component for special shows. This is a realistic
estimate and is substantiated by the increases in attendance which were noted in
earlier years when major facilities were added. There would be a corresponding
increase in revenues from entrance fees but more importantly, substantially
increased revenues from the food and sales outlet components of the Centre.
Offsetting the revenues would be the estimated maintenance and operating costs
which after a five year period, would be anticipated at $ll3,000.00 per year.
At this point the balance of cost to revenue would be favourable. If, in the
phasinq of the construction of the Visitors' Centre, those components which
produce revenue as well as service were given priority, a cose-revenue balance
would be even more favourable. Revenues would be maximized :maintenance 90sts
would be in proportion to the square footage built. :
From the review of all of the reports dealing with the Black Creek Pioneer
Village and the consideration given recently to a Visitors' Centre some
principles to guide decisions emerge.
- a Visitors' Centre has been recognized at the outset ~s an important
asset to the Village both from the point of view of contributing to
the quality of the visitor's experience and generating revenues.
- the cost of the full facility which is considered desirable and
B-16l - 8 -
necessary has been a major obstacle. The phasing of the provision of
the components which make up the Visitors' Centre should give first
priority to those components which offer service and generate revenue.
These are ticket collection and student assembly, gift shop and
Village craft sales outlet, restaurant and snack bar. The concept
which has been prepared for the Visitors' Centre indicates that 14,000
square feet are necessary to accommodate these functions.
- a Visitors' Centre facility should have a low architectural profile
so as not to dominate the village, provide for a smooth flow of
pedestrian traffic, make the revenue producing facilities easily
accessible both coming and going into the Village, and be designed to
reduce as much as pdssible energy costs.
_ the centre should have the capability of being expanded to include the
full range of services.
_ the cost of the facility constructed in each phase must be within the
capability of the Authority.
The design concept for the Black Creek Pioneer village visitors' Centre is
consistent with all of these principles except that dealing with cost. It would,
therefore, be appropriate to consider in the first phase of the Visitors' Centre
only those components which provide for student assembly and ticket taking,
restaurant and snack bar and the gift shop. These occupy approximatelY l4,000
square feet or 58% of the Phase I proposed in the design concept.
4.2 Maintenance Building and Service Area
The existing maintenance building and service area is located in the northwest
corner of the parking area adjacent to the pedestrian entrance to the Village.
The Master Plan prepared in 1964 recognized that this was an inappropriate
location for the service area and recommended that it be located in the south-
east corner of the Village grounds. A number of alternative locations for the
maintenance building and service area have been considered, none of them being
entirely satisfactory in terms of visual impact and beinq well located to
properly perform the service function. It has been concluded that the recomm-
endation made in the Master Plan to locate the service area in the southeast
corner of the Village is the best alternative.
4.3 Valleylands South of the Restored Area to Finch Avenue
The valleylands south of the restored area are in two sections: the val.ley
south of the restored area to Shoreham Drive and the valley south of Shoreham
Drive to Finch Avenue. The section between the restored area and Shoreham
Drive has been developed as the Peacock Woods. Because this area does not form
a part of the secured area of the Village and is accessible to the public at
all times, maintenance has been difficult and litter and vandalism a problem.
The area is a very important component of the approach to the Village and will
become more important when the Visitors' Centre has been built. The means of
including this area in the secured portion of the Villaqe should be investigated.
The valley lands of the Black Creek lying south of Shoreham Drive and extending
to Finch Avenue have not been developed as recommended in the 1968 Plan. Funds
for the development have not been available. The problems of litter, vandalism
and motorized vehicles, mainly trailbikes, have been increasing. A large
residential community has been developed adjacent to the west bank of the
valley and the east bank is bounded by the Authority's Administrative Head-
quarters ip the north, York University in the middle section and a residential
community to the south at Finch Avenue. The Conservation and Recreation Land
Man~gement Plan which is currently being considered by the Authority and member
municipalities recommends that this portion of the Black Creek be transferred
to Metropolitan Toronto under the Authority's agreement for management by the
Metropolitan Toronto Parks Department. Should this recommendation prove to be
the most appropriate means of managing this section of the valley, the Authority
should retain the right of a connecting access between Black Creek Pioneer
,Vill~ge and Finch Avenue to the location of the Indian Village Site.
4.4 Indi~n Village and Small-Gauge Railway
These remain proposals which are not feasible at the present time. No further
action concerning them is recommended at this time.
4.5 Restored Area
Earlier reports have identified a plan for the restored area including the
- 9 - B-162
I REG. MUNIC. OF YORK
/'
---
MUNIC. OF METROPOLITAN TORO\JTO
L
.'IlC.L !!!
......
O"ICI 1. VISITOR CENTRE
SHOREHAM DR
2. WORKSHOP AND SERVICE
3. PEACOCK WOODS (TO BE INCLUDED IN
SECURED AREA)
4. VALLEY LANDS - RECOMMENDED FOR TRANSFER
TO METRO
s: RICHMOND HILL HANSE
6. SAWYER'S HOUSE AND SAWHILL
7. STOCK BARN AND FARM
8. PROPOSED PROPERTY EXTENSION
9. COOPER'S SHOP
INDIAN VILLAGE
-
If
BLACK CREEK
. - - - -
-
B-l63 - lO -
buildings and types of architecture to be represented in the Village. In
Section 2.5 it was pointed out that the restorations which remain to be
completed are the Richmond Hill Manse, the sawmill, the Sawyer's House, the
COoper'$ Shop and the conversion of the Dalziel area to a stock barn and farm.
In addition to this, consideration should be given to extending the restored
area of the Village northward to the C.N.R. Railway and including a small
parcel of land and a period building which is existing on the site, if and when
the land and building becomes available. These restorations should proceed
as funds become available.
5. RECOMMENDATIONS
IT IS RECOMMENDED THAT the report of the Black Creek Pioneer Village Develop-
ment be received and the following action be taken:
(a) THAT a Visitors' Centre at the Black Creek Pioneer Village,to consist of
approximately l4,000 square feet and providing accommodation for student
assembly, ticket taking, washrooms, cafeteria and snack bar, gift shop
and sales outlet, storage and mechanical, consistent with the principles
established for the Visitors' Centre,be approved:
(b) THAT The Metropolitan Toronto and Region Conservation Foundation ,be
requested to establish a fund raising program for the Black Creek Pioneer
Village Visitors' Centre and that the staff be directed to prepare the
necessary display materials for the Foundation:
(c) THAT the location of the workshop and maintenance area be confirmed in the
southeast corner of the Village property as recommended in the 1964 Plan
of Development;
(d) THAT the staff investigate the means of enlarging the secured area of the
Village to include the valleylands south to Shoreham Drive;
(e) THAT,should the valleylands south of Shoreham Drive to Finch Avenue be
transferred to Metropolitan Toronto for management under the Authority's
agreement, that the right of access from Pioneer Village to the Indian
Village Site be retained and that the Indian Village Site be preserved
for future study and development:
(f) THAT the restoration program at the Black Creek Pioneer Village continue
in order to complete the following facilities, Richmond Hill Manse,
sawmill, Sawyer's House, the Cooper's Shop and the conversion of the
Dalziel area to a stock barn and farm: and that consideration be given to
extending,the northern boundary of the Village property to the C.N.
Railway line to include the property with the house,which is within the
Village period,should the property become available.
WAM/mm
1979.05.09.
B-164
FINANCIAL IMPACT
VISITORS CENTRE
BLACK CREEK PIONEER VILLAGE
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
MAY 1 , 1979
A!)pend 1x 1
B-165 1
GENERAL ASSUMPTION
1) It is assumed that the Visitors Centre will operate on, a year-round
basis and that before 198~the Village would also be operated year-round.
2) It is further assumed that the Centre will contain approximately 53,000
square feet of floor area. and will include all the facilities as outlined
in the Moriyama plan.
3) An adequate Visitors Centre will enable visitors to favourably compare the
Village with the new Family Leisure Centre near Maple.
4) For the purpose of this study. it is assumed that the Centre will be in
operation by July 1. 1980.
5) It is assumed that the inflation factor over the five years of this study
will increase by approximately 8% per annum.
2
B-l66
VISITOR VOLUME
It is assumed that the vtsitation without the Visitors Centre
will stabilize at around 300,000 per annum. It is further assumed that
!!1h the Visitors Centre the attendance will gradually increase in four or
five years by 30%.
1979 1980 1981 1982 1983
Visitation Without Centre 300.000 300,000 300,000 300.000 300.000
Visitation With Centre 300.000 310.000 350.000 365.000 390.000
, B-167 3
ENTRANCE FEES
It is ISsumed that the entrlnce' fees will !!9.1 increase betwen
1979 Ind 1983.
!!Z! 1980 l!!l 1982 1983
- - --
Entrance Fees $405.000 $418.000 $473.000 $493.000 $526.000
4 B-168
FOOD SERVICES
The food service gross, in 1978 was $400,OQO and M.T.R.C.A. revenue is
approximately 10%. It is assumed that the Centre will have facilities for a
dining room, cafeteria and snack bar. The dining room in both the Centre and
Half Way House will be available for receptions, banquets and catering for
, .
seminars and small conventions. It is assumed that Half Way House will have
a lower-priced. tavern type menu.
1979 1980 1981 1982 ~
Snack Bar $ 200,000 $ 200,000 $ 200.000 $ 200.000 $ 200.000
Half Way House 200,000 200.000 150,000 200,000 200.000
Centre - 100,000 200.000 300.000 300.000
400,000 500.000 550,000 700,000 750.000
MTRCA Revenue (10~) 40.000 50,000 55,000 70.000 75.000
B-169 5
SALES OUTLETS
It is assumed that there will be adequate space for displaying
Village produced items. souvenirs and crafts. Special emphasis will be placed
on the sale of Canadiana books. The profits on gift shop items is approximately
25S and on Village products 50S.
1979 1980 1981 J1R 1983
Gift Shop - $ 167.000
Gross Revenue $ 190.000 $ 225.000 $ 250.000 $ 275.000
MTRCA Revenue (251) 45.000 47,500 55,000 62.500 69.000
Village Products - S 105.000
Gross Revenue $ 120,000 $ 130.000 S 140.000 $ 150.000
MTRCA Revenue (50S) 52,500 60,000 65.000 70.000 75.000
6
8-170
EXPENDITURES
1 ) It is assumed that it will be necessary to employee one extra gift
shop clerk.
2) It is assumed that an extra person will be employed for cleaning and
maintenance purposes.
3) It is assumed that security will include monitoring equipment and that
one additional person will be required for peak hours only,
4) It is felt that the maintenance costs are realistic.
5) Heating, air conditioning and electricity costs are based on the
Moriyama report.
1979 1980 1981 1982 1983
1 ) Gift Shop Clerk - $ 5.500 S 12,000 $ 13,000 $ 14,000
2) Cleaning ~ Maintenance Person - 6,500 14,000 15,000 16.000
3) Securi ty Person - 13.500 29,000 31,000 33.000
4) Maintenance Costs - 2,500 15,000 16,000 17,000
5) Heating, Air Conditioning, - 13.500 29,000 31,000 33.000
Electricity
- 41.500 99.000 106.000 113.000
"
I
...
....
...
SUMMARY OF REVENUE . EXPENDITURES
1m. 1!!2 1.!!1. 1982 1983
REVENUE $ $ $ $ $
Food 40,000 50,000 55,000 70,000 75,000
Gift Shop 45,000 47,500 55,000 62,500 69,000
V1.11age Products 52,500 60,000 65,000 70,000 75,000
Seminars . Lectures . 8,000 12,000 14,000 15.000
Admissions 405.000 418.000 473.000 493.000 526.000
Total Revenue with Centre 542,500 583,500 660,000 709.500 760,000
Total Revenue WTifiOut C,ntre * 542.500 564.000 587.000 610,000 ,634,000
Increased Revenue !!!!!. Centre - 19,500 73.000 99 ;500 126,000
Additional Expend. with Centre . 41,500 99.000 106.000 113.000
Additional Revenue with Centre - 19,500 73,000 99.500 ' 126.000
. 22,000 26.000 6.500 (13.000)
* These figures assume'!!! increase in attendance, no increase in admission fees. and an' 8S yearly increase
in all other revenue.
....
N
r.-
....
I
III
SUMMARY OF REVENUE & EXPENDITURE
FOR PHASE ONE .
REVENUE 1979 1980 1981 1982 1983
-r- -r- ,- ,- ,-
Food 40,000 50,000 55,000 70,000 75.000
Gift Shop 45,000 47,500 55,000 62.500 69.000
Village Products 52,500 60.000 65,000 70.000 75,000
Se~inars & Lectures - - - - -
Admissions 405,000 418,000 473,000 493,000 526,000
Total Revenue with Centre 542,500 575.500 648,000 695,500 7';5,000
Total Revenue without Centre *542,500 564,000 587,000 6l0,000 634,000
Increased Revenue with Centre - 11.500 61,000 85,500 111. 000
Additional Expend. with Centre - 35,000 85,000 9l.000 97.000
Additional Revenue with Cantre - 11 , 500 61,000 85,500 111,000
NET CHANGE 23,500 24,000 5,500 (14,000)
* These figures assume no increase in attendance, no increase in admission fees, and an 8'
yearly increase in alr-other revenue.
~
, B-173
the metropolitan toronto and region conservation authority
minutes Report '8/79
EXECUTI~ COMMITTEE WEDNESDAY-JUNE-13-l979 f8/19
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, June 13, 1979, commencing at lO:OO a.m.
PRESENT WERE
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & Policy Mrs. A.C. Deans
Head, Waterfront Section, WRD B.E. Denney
Development Co-ordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
Supervisor, Property Administration, P&AD D.J. Prince
ABSENT WAS
Member Mrs. L. Hancey
CHAIRMAN I S REMARKS
The Chairman read a letter received from Mr. Charles Sauriol, Projects Director
for The Nature Conservancy of Canada, dated June 6, 1979, conveying thanks to
the Authority for its participation in and support of the Leskard Commemorative
Forest.
The Chairman also read a letter received from Mr. J.R. Powell, General Manager of
the Upper Thames River Conservation Authority, expressing appreciation of the
time and effort extended by the Chairman, Executive Committee and staff of The
Metropolitan Toronto and Region Conservation Authority in preparing and hosting
the visit of members and staff of the Upper Thames Authority to Black Creek
Pioneer Village, Kortright Centre for Conservation, Boyd Conservation Field'
Centre and the McMichael Canadian Collection, on Thursday, May 3l, 1979.
MINUTES
The Minutes of Meeting '7/79 were presented.
Res. 1204 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The Minutes of Meeting #7/79, as amended to include "Summary of
Revenue & Expenditure for Phase One" to Schedule "B", be adopted.
CARRIED;
B-174 -2-
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS ITS ADOPTION:
1. THE METROPOLITAN TORONTO AND REGION :
CONSERVATION FOUNDATION - APpointment of New Members
The Metropolitan Toronto and Region Conservation Foundation presented a
communication having regard to the appointment of new members to the ..'
Foundation.
Res. #205 Moved by: Mrs. F. Gell
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The communication of The Metropolitan Toronto and Region
Conservation Foundation, having regard to the appointment of new members
to the Foundation, be received: and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The follow~ng recommendation of the
Directors of The Metropolitan Toronto and Region Conservation Foundation be
approved:
THAT Mr. Wayne L. Naughty, Partner-in-Charge of Gardner McDonald & Company:
and Mr. R.S. Traquair, Vice President and Manager for the Metropolitan
Toronto Area of The Royal Trust Company, be appointed as members of The
Metropolitan Toronto and Region Conservation Foundation for a period of three
years, effective June 22, 1979.
CARRIED,
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: '
2. SOIL CONSERVATION SOCIETY OF AMERICA,
THIRTY-FOURTH ANNUAL MEETING: JULY 29-
AUGUST l, 1979, GHATEAU LAURIER, OTTAWA
-Attendance at
Res. #206 Moved by: E.H. Card
Seconded by: E.V. Kolb
RESOLVED THAT: Mr. W.E. Jones, Administrator, Property & Administration, be
authorized to attend the Thirty-Fourth Annual Meeting of the Soil
Conservation Society of America in Ottawa, July 29-August 1, 1979, and
THAT his expenses in connection therewith, in an estimated amount of $500.00,
be paid.
CARRIED,
3. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
-APpointment of Building Sub-Committee
A staff communication was presented, having regard to the appointment of a
building sub-committee for the Black Creek Pioneer Village Visitor Centre.
Res. 1207 Moved by: J.S. Scott
Seconded by: ~.H. Card
RESOLVED THAT: The recommendation to appoint a building sub-committee for
the Black Creek Pioneer Village Visitor Centre be tabled.
CARRIED,
4. ONTARIO PARKS ANNUAL CONFERENCE,
AUGUST 2-4, 1979, THUNDER BAY, ONT.,
-Attendance at
The Committee considered a request from Mr. Scott A. Macpher.son, Authority
member, for authorization to attend the Ontario Parks Annual Conference in
Thunder Bay from August 2 to August 4, 1979.
Motion~ Moved by: Mrs. F. Gell
Seconded by: E.V. Kolb
I
-3- B-175
RESOLVED THAT: Mr. Scott A. Macpherson be authorized to attend the Ontario
Parks Annual Conference in Thunder Bay, Ontario from August 2 to 4, 1979: and
THAT his expenses in connection therewith be paid.
THE MOTION WAS--------------------------------------------------NOT CA~ED;
5. MANDATE AND ROLE OF THE
CONSERVATION AUTHORITIES
A staff communication was presented advising that at a meeting of the
Executive Committee of The Chairmen's Committee of the Ontario Conservation
Authorities, held May l3-l4, 1979, it was "suggested that the conservation
authorities in each Region divide the local M.P.P's among them for purposes
of contact to discuss the role of cpnservation authorities".
Res. *208 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Report of the Working Group on the Mandate and Role of
the Conservation Authorities of Ontario be presented and discussed with all
M.P.P's in the area under the jurisdiction of The Metropolitan Toronto and
Region Conservation Authority: and
THAT the Chairman of the Authority assign to each member of the Executive
Committee responsibil~ty for presentation of the Report to individual M.P.P's.
CARRIED ,
6. REPORT 113/79 - FINANCE
SUB-COMMITTEE
Report 113/79 of the Finance Sub-Committee was presented.
Res. 1209 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: Report '3/79 of the Finance Sub-Committee be received, and
THAT THE FOLLOWING ACTION BE TAKEN:
The report re a priority rating system for the preparation of the 1980
Budget, as appended as Schedule "A" of these minutes, be approved;
The next meeting of the Finance Sub-Committee be held on Monday, June 18,
1979 at 1:30 p.m. at the Authority office.
CARRIED;
Res. 1210 Moved by: J.S. Scott
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Rather than consider a proposal to have a study made on a
data processing evaluation and considering the financial restrictions being
imposed by the Province, Metropolitan Toronto and the respective regional
municipalities, a Management Consultant be engaged to make a complete study
of th6 operations of The Metropolitan Toronto and Region Conservation
Authority, and that the scope and parameters be established by the Finance
Sub-Committee: and
THAT the cost of this study be financed first by the funds that wouid have
been provided for the data processing evaluation and the balance on a deficit
basis:
AND'FURTHER THAT the Finance Sub-Committee interview Management Consultants
and receive presentations with the object in view of submitting to the
Executive Committee, at the earliest possible time, recommendations outlining
the terms of reference for the management study and recommending the hirinq
of a Management Consultant as selecteQ by the sub-committee,
AND FURTHER THAT the members of the Personnel Sub-Committee be invited to
participate in these discussions and recommendations.
. ,
B-l76 -4-
On a recorded vote_ - vo~ing "YEA" 10 Voting "Nay" 1
Mrs. F. Gell R.G. Henderson
M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S." Scott
THE MOTION WAS------------------------------------------------------CARRIED:
7. QUOTATION #79-27
-Parking Tickets
A staff communication was presented advising that the following quotations
have been received for the supply of 200,000 daily parking tickets, to be
consecutively numbered in books of 50 tickets and in q~antities of 25,000
each of eight different colours:
Britannia Printers Limited $1,352.91
Charters PUblishing Company 1,597.83
York printing House Limited 1,665.48
Canad~an Offset Company Limited 1,690.00
The above prices include all taxes
Res. 1211 Moved by: E.R. Card
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received from Britannia Printers Limited for
the supply of 200,000 daily parking tickets, consecutively numbered in books
of 50 tickets and in quantities of 25,000 each of eight different colours,
in the sum total of $l,352.9l, including all taxes, be accepted: it being the
lowest quotation received.
CARRIED;
8. QUOTATION #79-30
ALBION HILLS CAMPGROUND
-Primary Hydro Line
A staff communication was presented advising that the following quotations
h~ve been received for the supply of material, labour and equipment for the
installation of approximately l,300 lineal feet of primary hydro line, five
hydro poles and necessary guy wires:
Bol ton Power Line Limi ted $1,795.00
Thor Powerline 1,800.00
K-Line Maintenance Construction Limited 4,825.00
Black & McDonald 5,637.00
Res. 1212 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The quotation received from Bolton Power Line Limited for
the supply of material, labour and equipment required to install approx-
iRately l,300 lineal feet of primary hydro line, five hydro poles and necessary guy wires
for the Albion Hills Conservation Area campground, in the sum of $1,795.00,
be accepted, it being the lowest quotation received.
~IED;
9. CANADIAN NATIONAL EXHIBITION
-Authority participation in
the Metropolitan Toronto
Exhibit
A staff communication was presented having regard to Authority participation
in the Metropolitan Toronto exhibit at the Canadian National Exhibition in
1979, as approved at Executive Committee Meeting 15/79.
Res. t2l3 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
-5- B-l77
RESOLVED THAT: The staff communication having regard to Authority
participation in the Metropolitan Toronto Exhibit at the 1979 Canadian
National Exhibition be received and approved; and
THAT the staff be directed to make the necessary arrangements for the
construction, installation and management of the exhibit:
AND FURTHER THAT funds be made available from the Water and Related Land
Management budget;
AND FURTHER THAT Complimentary Day Passes for selected Conservation Areas be
distributed in limited quantities.
CARRIED;
10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of the Environment
TO cross the Little Don River valley with a forcemain,
east side of Leslie Street, north from the Leslie Street
Pumping Station to 800 m. north of Green Lane, Town of
Markham
A staff communication was presented advising that an application has been
received for a permit to install a forcemain crossing the Little Don River
at the above location.
Res. #2l4 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application,of
the Ministry of the Environment, be received: and
THAT The application of the Ministry of the Environment for a permit to
undertake the installation of a forcemain crossing the Don River as the
forcemain extends along the east side of Leslie Street north from the Leslie
Street pumping Station to 800 metres north of Green Lane in the Town of
Markham' (The Regional Municipality of York), Don River watershed, be approved
subject to:
(a) Manholes Numbers 5 and 8 being equipped with watertight covers;
(b) All gabion works being preceded by a filter mat or a 6"-12"
layer of crushed stone:
(c) Every effort being made to minimize the silting of the creek
during construction;
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Town of Markham.
CARRIED,
11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
TOwn of Markham
For construction of a detention pond on the Exhibition
Creek, a tributary of the Rouge River, just north of
l6th Avenue, east of Highway #48
A staff communication was presented advising that an application has been
received for a permit to construct a detention pond on the Exhibition Creek
at the above location.
Res. 1215, Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff' communication, together with the application of
the Town of Markham, be received: and
THAT the application of the Town of Markham for a permit to undertake the
construction of a detention pond on the Exhibition Creek, a tributary of the
Rouge River, in the area just north of 16th Avenue, east of Highway 148 in
the Town of Markham (The Regional Municipality of York),Rouge River watershed
be approved, subject to:
(a) All areas disturbed due to construction being restored to the satis-
faction of the Authority:
B-118 -6-
(b) Every effort being made to minimize silting of the creek
during construction;
(c) All rip rap and gabion works being preceded by a filter mat
or a 61-l2" layer of crushed stone;
(d) Approval also being obtained from the Ministry of Natural
Resources;
(e) The Town of Markham confirming that storm water management
controls will be imposed on the developers within the drainage
area but not control by tge proposed pond. CARRIED I
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Water Survey of Canada
To construct a control weir on the downstream side of
the new bridge over the Highland Creek on Old Kingston
Road, Borough of Scarborough
A staff communication was presented advising that 'an application has been
received for a permit to construct a control weir on the Highland Creek at
the above location.
Res. #2l6 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Water, Survey of Canada, be received: and
THAT the application of The Water Survey of Canada for permission to under-
take the construction of a control weir on the downstream side of the new
bridge over the Highland Creek on Old Kingston Road in the Borough of
Scarborough (Highland Creek watershed), be approved, subject to:
(a) Every effort being made to minimize silting of the creek during
construction; ,
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of the Metropolitan Toronto
Parks Department.
CARRIED;
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mendoza Restaurant and Inn
To undertake shoreline improvements at rear of 12161
Lakeshore Boulevard West, Borough of Etobicoke
(Wa terfront)
A staff communication was presented advising that an application has been
received for a permit to undertake shoreline improvements along the
Etobicoke shoreline at the above location.
Res. ft2l7 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
the Mendoza Restaurant and Inn, be received: and
THAT the application of the Mendoza Restaurant and Inn for a permit to under-
take shoreline improvements at the rear of 12l6l Lakeshore Boulevard West,
Borough of Etobicoke, be approved, subject to:
(a) All core material required for the works being rubble or quarry
stone and that no earth material be used as core material;
(b) The larger rubble material along the exterior perimeter of the
"- east side of the groyne being placed as opposed to simply
dumped so as to minimize losses due to wave action,
(c) Authority staff being notified of the completion of the works
so that a site inspection may be arranged;
(4) This permit not precluding any other approvals that may be
required in connection with the proposed shoreline improvements.
CARRIED,
-7- B-179
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Consumers' Gas Company
To c~oss the Humber River with proposed 4" dia. gas main
on Indian Line Road, Part Lot 7, Concession VIII, Town
of Caledon
A staff communication was presented advising that an application has been
received for permission to cross the Humber River with a proposed 4" dia. gas
main at the above location.
Res.",2l8 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Consumers' Gas Company, be received; and
THAT the application of Consumers' Gas Company for permission to cross the
Humber River with a proposed 4" diameter gas main on' Indian Line Road, on
Part of Lot 7, Concession VIII, Town of Caledon, The Regional Municipality
of Peel (Humber River watershed), be approved, subject to the following
a~endments and conditions:
(a) The crossing being restored with rip rap on the banks and bed of
the river. The rip rap must be preceded by a filter mat or a
6"-12" layer of crushed stone;
(b) The river configuration being maintained after construction:
(c) Every effort being made to minimize silting of the creek during
construction;
(d) Provisions being made to allow for continuous flow in the creek;
(e) All areas disturbed due to construction peing restored to the
satisfaction of the Authority.
CARRIED,
15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. W. Hewitt Bayley
To undertake shoreline and bank stabilization works at
Scarborough Bluffs at rear of #l7 Fallingbrook Drive,
part of Il5 Fallingbrook Drive and part of Toronto Hunt
Club property, Borough of Scarborough (Waterfront)
~ staff communication was presented advising that an application has been
received for permission,to construct ~horeline and bank stabilization works
at the above location.
Res. '219 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Mr. W. Hewitt Bayley, be received; and
THAT the application of Mr. W. Hewitt Bayley for a permit to construct shore-
line and bank protection works at the rear of tl7 Fallingbrook Drive, Borough
of Scarborough, be approved, subject ~:
(a) Written permission being received from the property owners of '15
Fallingbrook Drive and the Toronto H~t Club for work to be carried
out on their property:
(b) permission being received from the property owners along the water-
front allowing for access of the equipment:
(c) The Authority being notifi~d at least one week prior to the start of
construction:
(d) Precautions being taken to prevent possible future scouring of,the
toe of the retaining wall at the toe of the bluff, and that this be
monitored regularly:
B-l80 -8-
Ce) The works being carried out as per contractor's revised report
on terms and specifications:
( f) All other necessary approvals and permits being obtained.
CARRIED:
16. TOWN OF MARKHAM
-Request re Unionville Planing
Mill Limited
Res. #220 Moved by: M.J. Breen
Seconded by: J.S. Scott
RESOLVED THAT: Subject to obtaining an Inspection Certificate from the
Ministry of Natural Resources, the Authority proceed with the purchase of
the Unionville Planing Mill Limited property, being All of Lot 1, and Part
of Lot 2, Registered Plan 348, Town of Markham, The Regional Municipality of
York, containing 0.950 acres, more or less, together with certain improve-
ments at a price of $l25,000.00, plus Vendor's legal costs7 the sum of
$lO,OOO.OO being payable on or before July 3l, 1979, the balance to be
covered under a first mortgage bearing interest at l.O~ per cent per annum,
due and payable on January 3l, 19807 and
THAT upon completion of the purchase, the Authority enter into a suitable
management agreement with the Town of Markham for the restoration of the
Planing Mill and maintenance of the property:
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of any additional necessary approvals and the
execution of any documents.
CARRIED;
17. OCCUPIERS I LIABILITY AND TRESPASS
TO PROPERTY
-Discussion Paper
A staff communication was presented advising that the Discussion Paper on
Occupiers' Liability and Trespass to Property has been reviewed in accord-
ance with the request of the Ministry of the Attorney General.
Res. #221 Moved by: M.J. Breen
Seconded by: Dr. T.R. Leith
RESOLVED THAT: The staff report and comments having regard to the Discussion
Paper on Occupiers' Liability and Trespass to Property be received; and
THAT the Ministry of the Attorney General be advised that the Executive
Committee has reviewed the Discussion Paper on Occupiers' Liability and
Trespass to PropertY7 and
WHEREAS conservation authorities are empowered under Section 27(1) of The
Conservation Authorities Act to make regulations regarding Fill, Construction
and Alteration to Waterways and to appoint officers to enforce such
regulations:
THAT the Ministry of the Attorney General be requested to make provision
within The Petty Trespass Act for enforcement officers appointed by a
conservation authority to enter upon another person's land in the performance
of their,duties7
AND FUR~ER that the Ministry of the Attorney General be requested to con-
sider higher fines for trespass.
CARRIED'
18. THE CONSUMERS' GAS COMPANY
-Request for Permanent Easement,
Borough of Scarborough
A staff communication was presented advising that a request has been received
from The Consumers' Gas Company to provide a permanent easement for re-
location of a l6" gas pipeline located on the south side of Military Trail,
west of Neilson's Road.
The proposed easement affects Authority-owned land known as Part of Lot 15,
Concession II, Borough of Scarborough, The Municipality of Metropolitan
Toronto.
-9- B-18l
Res. #222 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A permanent easement be granted to The Consumers' Gas
Company, required for relocation of a l6" gas pipeline located on the south
side of Military Trail, west of Neilson's Road. Said easement is shown as
Parts 1 and 2 on Plan 64R-6886. The Authority-owned land affected is Part of
Lot 15, Concession II, Borough of Scarborough, The Municipality of
Metropolitan Toronto. Said easement to be granted for the nominal consid-
eration of $2.00, subject to The Consumers' Gas Company being responsible for
carrying out and paying all legal, survey and other costs involved in the
transactionJ and
BE IT FURTHER RESOLVED THAT the appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
19. THE CONSUMERS' GAS COMPANY
-Request for Permanent Easement,
City of North York
A staff communication was presented advising that a request has been received
from The Consumers' Gas Company to provide a permanent easement for gas pipe-
lines located on the west side of Islington Avenue, north of Finch Avenue.
The proposed easement affects Authority-owned land known as Parts of Lot 21,
Concession VII, W.Y.S., City of North York, The Municipality of Metropolitan
TOronto.
Res. #223 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A permanent easement be granted to The Consumers' Gas
Company, required for gas pipelines located on the west side of Islington
Avenue, north of Finch Avenue. Said easement is shown as Parts 1, 2 and 3
on Plan 64R-65l5. Authority-owned land affected is Parts of Lot 21,
COncession VII, W.Y.S., City of North York, The Municipality of Metropolitan
TOron to. Said easement to be granted fo~ the nominal consideration of $2.00
subject to The Consumers' Gas Company being responsible for carrying out and
paying all legal, survey and other costs involved in the transaction: and
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effeqt
thereto.
CARRIED,
20. TOWN OF MARKHAM
-Former D. & T. MacIver Property
A staff communication was presented advising that in accordance with
Resolution #372/78 of the Executive Committee, the staff has had several
discussions with officials of the Town of Markham regarding placing the
former D. & T. MacIver property under management agreement with the TOwn.
The Authority has recently been advised that the Town is now in a position
to enter into a suitable manageme~t agreement with the Authority for the use
of this property.
Res. '224 Moved by: M.J. Breen
Seconded by: Mrs. J .A. Gardner
RESOLVED THAT: The Administrator, Property and Administration, be directed
to arrange ,for the preparation, of a suitable agreement covering the use of
certain Authority-owned lands in the Markham area known as the former
MacIver property, for maintenance and development purposes, by the Town of
Markham. Said lands being All of Lots 29 to 39 inclusive, Block "M",
Registered Plan l73, Town of Markham, The Regional Municipality of York, and
THAT the appropriate Authority officials be authorized and directed to take
whatever action may be required to give effect t~ereto, including the obtain-
ing of necessary approvals and the execution of any documents.
CARRIED,
B-182 -lO-
21. INTERIM WATER & RELATED LAND ~~NAGEMENT ~ROJECT 1979-l981:
DUFFIN CREEK WATERSHED COMPONENT
-Property: E.D. &'G.H. Neville & L.E. Wilton
Res. #225 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Report (June 6, 1979) set forth herein, received from
the Property Administrator, be adopted and that the secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED,
"Re: Project: Interim Water & Related Land Management Project
1979-l98l - Flood Plain & Valley Land Acquisition
Component: Duffin Creek Watershed
Au thori ty: Executive Resolution No.133, Meeting No.4 - April
l2, 1978 and Authority Resolution No.51, Meeting
No.3 - April 2l, 1978
Subject Property: South side of Main Street West
owners: E.D. & G.H. Neville and L.E. W~lton
Area to be
Acquired: 0.246 acres, more or less
Recommended
Purchase Price: $l62,000.00 in full for all claims for lands and
businesses, plus Vendors' legal and appraisal costs.
-Included in the requirements for the above-noted project is an irreqular-
shaped parcel of land, being All of Lot 4, Registered Plan 858 and Part of
Lot 35, Concession IX, Town of Whitchurch-Stouffville, having a total front-
age of approximately 69 feet on the south side of Main Street, west of
Market Street in the downtown section of Stouffville.
-Situate on the property is a single-storey, detached, masonry building and a
11:1 storey frame, insulbrick-clad building used for commercial purposes.
-Negotiations have been conducted with the owners and their solicitor, Mr.
D.C. Hindson, of the legal firm Cattanach, Hindson, Sutton & Hall, 52 Main
Street North, Markham, Ontario, L3P lXS and, subject to the approval of your
Committee, agreement has been reached with respect to a purchase price, as
follows:
The purchase price is to be the sum of $162,000.00 in full for all
claims for lands and businesses, plus Vendors' legal and appraisal
costs~ with date of completing the purchase to be as soon as
possible.
-I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"Funds are available.
-An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
22. M.T.R.C.A. -and- HENDON ESTATES LIMITED
-Exchange of Lands
A staff communication was presented advising that negotiations have been con-
ducted over the past several months with officials of Hendon Estates Limited
concerning the'acquisition of a small par~el of land required by the
Authority from a commercial property fronting on the north side of Main
Street in Stouffville for construction of the Stouffville Channel.
Res. 1226 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Hendon Estates Limited convey to the Authority a small parcel
of vacant land containing 0.037 acres, more or less, being Part of Lot 5,
Registered Plan 70, TOwn of Whitchurc'h-Stouffville, in exchange for a parcel
of Authority-owned land containing 0.025 acres,' more or less, being Part of
~t 5, Registered ,Plan 70, Town of Whitchurch-Stouffville. The exchange is
to be for the nominal consideration of $2.00, with the Authority to be
-11- B-183
responsible for payment of all legal, survey and other costs involved in
completing the transaction; and
THAT .said exchange be subject to an Order-in-Council being issued in accord-
ance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970,
Chapter 78 as amended;
AND FURTHER THAT: The appropriate Authority officials be authorized and
directed to sign the necessary documents to give effect thereto.
CARRIED,
23. THE MINISTRY OF GOVERNMENT SERVICES
-Request f?r Conveyance of Authority-
owned land: Town of vaughan
A staff communication was presented advising that a request has been
received from the Ministry of Government Services for a parcel of ,Authority-
owned land situate in the Humber River valley between Kipling and Islington
Avenues. The lands are required for the construction of new Ontario Hydro
500KV tower lines and ultimately the new Highway #407.
Res. #227 Moved by: M.J. lJreen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A parcel of Authority-owned land, containing 84.666 acres, be
conveyed to the Ministry of Government Services. Said land being shown as
Parts l7, 18, 19 and 20 on Plan 856-27L prepared by the Ministry of
Government Services, being Part of Lots l, 2 and 3, Concession VII, Town of
Vaughan, The Regional Municipality of York, consideration to be the sum of
$432,000.00, plus all legal, survey, appraisal and other costs involved in
completing the transactionJ and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20(c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78 as amended,
AND FURTHER THAT: The appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
24. EXTRA FLOOD LINE PLOTTING - DON RIVER WATERSHED
-Change Order U
A staff report was presented advising that it has been found necessary to
extend the flood line plotting in certain areas of the Don River in order to
cover all areas felt to be of importance with regard to flood sensitivity.
Minor readjustments are also required in the presentation of the flood lines
to facilitate checking of these flood lines and to obtain better correlation
between the results of this contract and those of the already completed
contracts.
The following change order has been received in this regard: Change Order fl
R.V. Anderson Associates Limited - $3,327.91 - representing an increase in
the initial contract by $3,327.9l
To extend the flood line plotting in certain areas of the Don River and to
undertake minor readjustments in the presentation format for the, flood lines
in order 'to account for all areas of flood sensitivity and obtain a better
correlation between contracts.
Res. '228 Moved by: Dr. T.H. Leith
Seconded by: J.S. Scott
RESOLVED THAT: Extra Work Order #1 to the contract for the flood line
plotting of the Don River by R.V. Anderson Associates Limited, in the amount
of $3,327.91, be approved.
CARRIED,
B-184 -l2-
25. WATERFRONT PROJECT 1977-1981: SCARBOROUGH SECTOR
-Bluffers Park - Parking Areas
A staff communication was presented advising that tenders have been received
for the grading and paving of the large parking area adjacent to the
launching ramps at the above location, and for the extension of the existing
parking lots in Phase I, as follows:
Disher Farrand Limited $171,288.00
Miller Paving Limited 182,252.00
D. Crupi & Sons Limited 202,000.00
Repac Construction Limited 203,000.00
DOminion Paving Limited 211,973.36
Warren Bithulithic Limited 223,923.00
York Paving Asphalt & Concrete 275,000.00
The Toronto Harbour Commissioners, as agents for the Authority, prepared the
designs and called for tenders. The Toronto Harbour Commissioners have
reviewed the tenders and have submitted a report recommending the award of
the contract to the low bidder, Disher Farrand Limited.
Res. #229 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The contract for grading and paving of parking areas at
Bluffers Park be awarded to Disher Farrand Limited, in the amount of
$l71,288.00, subject to the approval of the Ministry of Natural Resources.
CARRIED~
26. BRAMPTON DIVERSION CHANNEL - MAJOR MAINTENANCE
-Quotation: Chain Link Fencing
A staff communication was presented advising that six tenders have been
received (of six invitations) for the supply and placement of approximately
1,572 lineal feet of six-foot high chain link fence adjacent to the Brampton
Diversion Channel:
F. Powell & Company Limited $12,499.00 FST included
Roma Fence Limited ll,254.00 FST included
Frost Steel & Wire Company Limited ll,372.00 FST included
Hutt Fence Limited l2,803.00 FST included
Res. 4230 Moved by: C.F. Kline
Seconded by: E.V. Kolb
RESOLVED THAT: The quotation received from Roma Fence Limited for the
supply and placing of l,572 lineal feet of chain link fence, in the sum of
$11,254.00, plus P.S.T., be accepted, it being the lowest quotation received.
CARRIED:
27. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL
MUNICIPALITY OF DURHAM
-Proposed Remedial Work: #l6 Elizabeth Street & vicinity,
Town of Ajax (Duffin Creek Watershed)
A staff report was presented advising that as outlined in the staff report
"Erosion Control and Bank Stabilization in the Regions of Peel, York and
Durham, approved by the Executive Committee at Meeting #l5/78, remedial work
is proposed at the rear of #l6 Elizabeth Street and vicinity, Town of Ajax.
Res. ,23l Moved by: Mrs. S. Martin
Seconded by: J.S. Scott
RESOLVED THAT: Erosion control work be carried out at the rear of ,l6
Elizabeth Street and vicinity, Duffin Creek watershed, Town of Ajax, at an
estimated cost of $l9,800.00~ and
THAT the approval of the Ministry of Natural Resources be requested:
AND FURTHER THAT the benefiting property owners be required to contribute the
portion of their land on which the proposed work will be carried out.
CARRIED:
-l3- B-l85
28. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
EROSION CONTROL & SLOPE STABILIZATION IN THE REGIONAL
MUNICIPALITY OF PEEL
-Proposed Remedial Work: #l38 King Street, Village of
Bolton, Town of Caledon (Humber River Watershed)
A staff communication was presented advising that as outlined in the staff
report "Erosion Control and Bank Stabilization in the Regions of Peel, York
and Durham", approved by the Executive Committee at Meeting #15/78, remedial
work is proposed at the rear of il38 King Street, Town of Caledon.
Res..#232 Moved by: E.V. Kolb
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Erosion control work be carried out at the rear of tl38 King
Street, Humber Rive~ watershed, Town of Caledon, at an estimated cost of
$18,700.00: and
THAT the approval of the Ministry of Natural Resources be requested;
AND FURTHER THAT the benefiting property owner be requ~red to pay an amount
of $l,800.00.
CARRIED;
29. CANADA-ONTARIO FLOOD DAMAGE REDUCTION PROGRAMME
A staff report was presented having regard to a Flood Damage Reduction Programme
initiated by the Federal government. The objectives of this programme are to
reduce damage and to prevent loss of life due to flooding.
Res. #233 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: The Authority approve its participation in the canada-
Ontario Flood Damage Reduction Programme: and
THAT The Metropolitan Toronto and Region Conservation Authority request the
approval of The Municipality of Metropolitan Toronto, The Regional
Municipalities of Peel, York and Durham, a~d the Townships of Mono and Adjala
of the terms of the Federal/Provincial Flood Damage Reduction Programme
agreement.
CARRIED,
30. REPORT 11/79 - TENDER OPENING SUB-COMMITTEE
-Buildings and Structures:
Humber Bay East Waterfront Area
The Report of the Tender Opening Sub-Committee was presented.
Res. 1234 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Report '1/79 of the Tender Opening Sub-Committee be received
and appended as Schedule nB" of these Minutes; and
THAT the firm of M.A. Butt be retained to undertake construction of buildings
and structures at the Humber Bay East Waterfront Area at a cost of
$780,7ll.00, as recommended by the consultants, Johnson Sustronk Weinstein'
Associates Limited.
CARRIED:
31. KORTRIGHT CENTRE FOR CONSERVATION
-Quota~ion for Cash Registers
A staff communication was presented advising that the following quot,tions
have been received for two cash registers for the Kortright Centre for
Conservation to serve the merchandise-admission area and the food service
area:
Company Price for 1 unit Price for 2 units Comments
N C R $1,417.75 $2,835.50 4 Departments
Sweda 1,495.00 2,840.00 6-8 Departments
I.B.M. $4,000 - $6,000 More complex -
100 Departments
B-186 -14-
These cash registers are included in the 1979 Authority Budget Estimates
and have been approved for wintario grant in the list of furnishings,
equipment and exhibits for the Kortright Centre for Conservation.
Res. '235 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received 'from Sweda Sales Register Systems for
the supply of two cash registers for the Kortright Centre for Conservation,
in the sum of $2,840.00, be accepted1 this being the most suitable machine
for the purpose required. CARRIED,
32. KORTRIGHT CENTRE FOR CONSERVATION
-Quotation #79-32 - Asphalt Paving
A' staff communication was presented advising that the following quotation
has been received (from 3 invitations) for asphalt work at the Kortright
Centre for Conservation:
King City Paving Company $13.00 sq. yd.
Res. '236 Moved by: E.V. Kolb
Seconded by: Mrs. J .A. Gardner
RESOLVED THAT: The quotation received from King City Paving Company for
asphalt paving at the Kortright Centre for Conservation, at $l3.00 per square
yard, or an estimated amount of $9,lOO.00, be accepted.
CARRIED r
33. ICORTRIGHT CENTRE FOR CONSERVATION
-Quotation #79-33 - Timber Steps
A staff communication was presented advising that the following quotation has
been received (from 3 invitations) for the supply and installation of timber
steps at the Kortright Centre for Conservation:
Leslie L. Solty & Sons Limited $2,800.00
Res. '237 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received from Leslie L. Solty & Sons Limited
for the supply and installation of timber steps at the Kortright Centre for
Conservation, in the sum of $2,800.00, be accepted.
CARRIED;
34. BLACK CREEK PIONEER VILLAGE
-Quotation - Walkaround Brochure
A staff communication was presented advising that the following quotations
have been received for the web offset printing, folding and supply of
100,000 copies of the Black Creek Pioneer Village Walkaround Brochure:
Web Offset Publications Limited $1,490.00
Paul Brewster 1,600.00
I~land Press 2,590.00
Res. 1238 Moved by: E.V. Kolb
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation of Web Offset publications Limited for the
offset printing, folding and supply of 100,000 copies of the Black Creek
Pioneer Village Walkaround Brochure, in the sum of $1,490.00, plus $175.00
for typesetting, plus Federal and Provincial Sales Taxes, be accepted, it
being the ,lowest quotation received. ,CARRIED;
HEW BUSINESS
35. REPORT OF THE RECOGNITION SUB-COMMITTEE
~s. Gardner presented a report and recommendation of the Recognition Sub-
Committee.
Res. '239 Moved by: Mrs. J .A. Gardner
Seconded by: M.W.H. Biggar
RESOLVED THAT: The customary Garden Party at which awards have been made in
the past, be held on Thursday, July 5, 1979, at the Black Creek Pioneer
-15- B-l87
Village, in the form of a Strawberry Social, and that the day be named
"The Bill Davidson Day" in honour of Mr. W.C. Davidson, Q.C., who will be
the recipient of the gold award for 20 years' service to the Authority, and
in special recognition of his services and exceedingly generous donation to
The Metropolitan Toronto and Region Conservation Foundation; and
THAT the Garden Party take the form of a luncheon with strawberries, and
following, a tour of the most recently opened buildin~s at the Village;
ANI? FURTHER THAT the invitation emphasize "The Bill Davidson Day".
CARRIED:
36. UTILITY EASEMENTS
Res. 11240 Moved by: M.W.H. Biggar
Seconded by: Mrs. F. Gell
RESOLVED THAT: The staff be directed to prepare a report for the Executive
Committee which will review the present position whereby the Authority
exempts certain utilities from paying a fee for easements granted in
connection with laying utility lines on Authority property. CARRIED:
37. GLASSCO PARK
-Painting of Buildings
The C1aiJ:man of the Farm Sub-Ccmni. ttee subni tted a verbal report on t,he
proposed painting of buildings at the Glassco Farm and requested the con-
sideration of the Executive Committee.
Res. #241 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The quotation of Marshall Floyd for the painting of sides and
roofs of buildings and fences in the Glassco Park, in the amount of
$2,979.lS, be accepted; and
THAT the staff be authorized to spend a total amount not to exceed $3,500.00
on said painting and other improvements.
CARRIED;
38. EXECUTIVE SECRETARY TO THE CHAIRMAN OF
THE METROPOLITAN TORONTO AND REGION
CONSERVATION FOUNDATION
A discussion took place with respect to the employment of an Executive
Secretary for the Chairman of The Metropolitan Toronto and Region
Conservation Foundation.
Res. '242 Moved by: Mrs. F. Gell
Seconded by: J.S. Scott
RESOLVED THAT: The Authority employ an Executive Secretary for the Chairman
of The Metropolitan Toronto and Region Conservation Foundation; and
THAT the Foundation be authorized to make the appointment.
THE MOTION WAS-------------------~------------------------------NOT CARRIED:
39. THE METROPOLITAN TORONTO AND REGION
CONSERVATION FOUNDATION
-Donation to
On behalf of the Chairman of The Metropolitan Toronto and Region Conservation
Foundation, Mrs. Gardner advised that the Foundation is in receipt of a
donation in the amount of $2,000.00 from Imperial Oil Limited for the
Kortright Centre for Conservation.
40. EXECUTIVE COMMITTEE
-Calling of Meeting
The Secretary-Treasurer was directed to call a meeting of the Executive
, B-188 -16-
,Committee for Wednesday, June 27, 1979, commencing at 10:00 a.m. at the
Authority office~
41. ADJOURNMENT
On Motion, the Meeting adjourned at 1:50 p.m.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
8-189
SCHEDULE A
..,
TO: The Chairman and Members of the Finance Sub-Committee, M.T.R.C.A.
Meeting #3/79 - Thursday, June 7, 1979
FROM: Director of Planning and Policy
RE: A PRIORITY RATING SYSTEM FOR ~HE PREPARATION OF TH~ 1980 BUDGET
An adoption of the ~ero based budgetting system was introduced for the
preparation of the 1979 budget. It is proposed to continue this system for the
preparation of the 1980 budget. The experience gained in 1979 showed that some
modification would be useful, and would enable a consistent approach to
tailoring the budget to the funds available. , .
These modifications are as follows:
1) State at the outset the objectives of the Authority for the budget year,
as the basis for establishin~ priorities.
2) Employ a matrix analysis system which will enable rating of ,activity
priorities within program or project components. This will replace the
analysis of the effect of , decreases in budget allocations.
OBJECTIVES OF THE AUTHORITY FOR THE BUDGET YEAR 1980
The Mandate and Role statement prepared for conservation authorities establishes
two principal objectives for the Authority.
(1) "each conservation authority shall study and investigate the watershed
and prepare and file with its member municipalities and the Ministry of
Natural Resources, a watershed plan."
(2) -to develop and implement a program of water and related land management
to prevent loss of life and minimize property damage from flooding and
erosion in the area over which they have jurisdiction consistent with
social, economic and environmental considerations."
Priority will be given to established programs, projects, and activities which
contribute directly to these objectives, and for which funding or specific
commitment exists.
In addition, priority will be given to meeting all legal obligations, and fixed
costs where no reasonable alternative exists relating to the programs of the
Authority. . ,
The Role and Mandate statement identifies ancillary resource management programs.
1) Identify and conserve those natural resources of regional significance
within the area over which they have jurisdiction.
2) Manage lands acquired for the purpose of achieving their objects to produce
ancillary resource and recreation benefits compatible with the purpose for
which the lands were acquired and consistent with local and provincial
demands and priorities.
3) Enter into agreements with appropriate agencies to assume additional water,
recreation or resource management responsibilities consistent with local
and provincial priorities.
Ancillary priority will be given to meeting these objectives. Information and
Education programs which do not fall wi thin subsequent categorie,s (second and
third priorities) will be considered as falling within the ancillary priorities.
Excepting where an existing agreement, commitment or fixed cost extending beyond
the current year exists second priority will be given to extendi~g or establish-
ing new programs which contribute to priority objectives.
Third priority will be given to establishing new programs which contribute to
ancillary priority objectives.
MATRIX ANALYSIS OF PROGRAM OR PROJECT COMPONENTS
Within each program or project the components should be rated using a matrix.
There are a number of criteria which can be applied. The following is a
suggested order of priority. This may require adjustment depending on the
B-190
Finance Sub-Committee Meeting '3/79
A Priority Rating system for the preparation
of the 1980 audget paqe 2
program or project.
1) Minimum administration and operation costs required to operate
the component, excepting those charged to administration,
2} Studies and design required to implement scheduled works or
activityr
3} Scheduled works or activity (sub criteria deqree of objectives
"achieved, cost = revenues):
4} Studies and design required to complete programme or project
preparation;
51 Land Acquisition - commitments
_ required for scheduled works
_ flood plain and valley
- headwaters,
61 Completion of long term base studies:
71 Continuing long term base studies,
8} Initiating long term base studies.
The first draft of the budget is to be prepared by each Division during the
~nth of June for assembly during July and August in preparation to go to the
Advisory Boards, as scheduled, in September. In the drafts of the budget
prepared by the Divisions, the salary and wage components should be included at
1979 levels. Adjustments will be made for any increases that may be recommended
for 1980 following direction from the Personnel Sub-Committee. It is
anticipated that the Personnel Sub-Committee would meet in August, 1979.
1979.06.06.
WAM/JIlIIl
B-19l
SCHEDULE "B"
THE METROPOLITAN TORONTO AND REGION CONSJRVATION AUTHORITY
REPORT 11/79
of the
TENDER OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive,
Downsview on Friday, June 8, 1979, commencing at 2:00 p.m. to open tenders for
Buildings and Structures, Humber Bay East Waterfront Area.
PRESENT WERE
Chairman R.G. H~nderson
Vice Chairman Mrs. F. Gell
Chairman, Humber Valley Advisory Board t-trs. J. A. Gardner
Johnson Sustronk weinstein & Assoc. Ltd. H. Sustronk
Consulting Engineers
Staff W.A. McLea1\
M.R. Garrett
B.E. Denney
The Committee was advised that 3l sets of documents were taken out by contractors
and six tenders were received, as follows:
Contractor Total Tender
M.A. Butt $ 780,711.00
Trist Construction Limited 791,303.00
Ha~ovic Construction Limited 821,118.00
D.A. Campbell-Disher Farrand 953,388.40
Lisgar Construction 1,014,488.65
A.G.A. Construction Limited 1,056,724.00
IT WAS AGREED AND THE COMMITTEE RECOMMENDS:
THAT 'all' tenders received for Buildings and Structures - Humber Bay East
Waterfront Area be referred to the consultants, Johnson Sustronk weinstein &
Associates Limited, for their review and report"with recommendations to the
Executive Committee meeting to be held on Wednesday, June 13, 1979.
R.G. Henderson W .A. McLean, DUector of Planninq & POlicy
Chairman Acting Secretary-Treasurer
1979.06.12
/XC.
~ B-192
,
the metropolitan toronto and region conservation authority
minutes Report '9/79
EXECUTIVE COMMITTEE WEDNESDAY-JUNE-27-l979 19/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, June 27, 1979, commencing at lO:OO a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biqgar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance' Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & Policy Mrs. A.C. Deans
Development co~ordinator, Planning & policy J . W. MaleUch
HEARIN GS:
,
FOllowing the Roll Call, the meeting recessed to hold Hearings reI
(1) Town of Caledon'
Village of Bolton
Humber River Watershed
( 2) Samuel Sarick Limited
City of Mississauga
Mimico Creek Watershed
Miss L. Trivelli recorded the proceedings of the Hearings.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mn. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
J.S. Scott
Secretary-Treasurer K.G. Higgs
Adm. - Information & Education Division T.E. Barber
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Admin~stration Division W.E. Jones
Research Planner, Planning & policy Mrs. A.C. Dean~
Development Co-ordinator. Planning & Policy J.W. Maletich
B-l93 -2-
ABSENT WAS
Member Mrs. S. Martin
MINUTES
The Minutes of Meeting #8/79 were presented.
Res. '243 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The Minutes of Meeting 18/79, as presented, be adopted as if read.
CARRIED;
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY.
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
1. REPORT 12/79 - OFFICIAL OPENING SUB-COMMITTEE
-Kortright Centre for Conservation
Report 12/79 of the Official Opening Sub-Committee - Kortright Centre for
Conservation was presented.
Res. '244 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
RESOLVED THAT: Report #2/79 of the Official Opening Sub-Committee - Kortright
Centre for Conservation, as presented, be received.
CARRIEDJ
2. REPORT OF JOINT MEETING OF FINANCE AND
PERSONNEL SUB-COMMITTEES
The staff presented a report of a joint meeting of the Finance and Personnel
Sub-Committees held June l8, 1979.
Res. '245 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The report of the joint meeting of the Finance and Personnel
Sub-Committees, held June l8, 1979, as amended and appended' as Schedule "A" of
these Minutes, be received.
CARRIEDJ
3. ONTARIO REGULATION 845/77 AS AMENDED:
CONSERVATION AREAS - METROPOLITAN
TORONTO AND REGION
-Appointment of Enforcement Officers
A staff communication was presented advising that investigation and evaluation
of the appointment of part-time staff members as Enforcement Officers at the
Indian Line and Albion Hills camp grounds has been undertaken in accordance
with Resolution 1140 of Executive Committee Meeting 16/79.
Res. 1246 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: Mr. Wallace Wand, Supervisor of the Albion Hills Campground,
and Mr. Arthur Southin, Supervisor of the Indian Line Campground, be appointed
officers to enforce Ontario RegUlation 845/77 as amended, made under The
Conservation Authorities Act.
CARRIED,
-3- B-l94
4. DECISION OF HEARING
Town of Caledon
Village ~f Bolton
Humber River Watershed
Res. 1247 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this 27th day of June, 1979: and
TlmT the application of The Corporation of the TOwn of Caledon, in accordance
with Ontario Regulation 735/73 for permission to reconstruct the First Bolton
Scout Hut on the land of Dick's Dam Park in Bolton, on Part of Lot 9,
Concession 6, Village of Bolton, Town of Caledon (Humber River Watershed), be
refused for the following reasons:
-The proposed structure would be situated within the flood plain of
the Humber River as defined by the Regional Storm:
-The proposed structure would interfere with the control of flooding;
On a recorded vote - voting "YEA" 7 Voting "NAY" 4
R.G. Henderson Mrs. L. Hancey
Mrs. F. Gell C.F. Kline
M.W.H. Biggar E.V. Kolb
M.J. Breen J.S. Scott
E.H. Card
Mrs. J.A. Gardner
Dr. T.H. Leith
CARRIED;
5. DECISION OF HEARING
Samuel Sarick Limited
City of Mississauga
Mimico Creek Watershed
Res. 1248 Moved by: M.W.H. Biggar
Seconded by: M.J. Breen
BE IT RESOLVED THAT: This Executive Committee confirm the decision of ,the
Hearing held this 27th day of June, 1979, and
THAT the application of Samuel Sarick Limited, in accordance with Ontario
Regulation 735/73, for pe~ission to construct an addition to an existing
office building in an area which is regulated by this Authority on Block -E",
Plan 919, City of Mississauga (Mimico Creek watershed), be approved, subject
to:
-The applicant revising his drawings wherein no openings to the
new building shall be lower than the regional elevation of
164.2 (metric) :
-All existing excavated material being remov~d from the site;
-The revised drawings as recommended forming part of the permit,
-Every effort being made to minimize silting of the creek during
construction.
CARRIED,
6. GLEN HAFFY CONSERVATION AREA
-Refreshment Booth Operation
A staff communication was presented advising that the contract for the food
concession at Glen Haffy Conservation Area was awarded to Mr. James E. Maguire
for the 1979 season. The Authority has been advised that Mr. Maguire is
selling his house and his Airport Road food facility to a Mr. Lawrence J.
Rooney, who is interested in undertaking operation of the facility at Glen
Haffy Conservation Area at the end of June, 1979.
B-l95 -4-
Res. 1249 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The contract for the food service concession in the Glen Haffy
Conservation Area for the 1979 season be transferred from Mr. James E. Maguire
to Mr. Lawrence J. Rooney, effective June 27, 1979, and
THAT Mr. Rooney keep exact costs of his operation during this period, maintain
competitive prices for his product and operate the booth on weekends, holidays
and on other occasions in consultation with the Superintendent of the Area
when the public is utilizing this Area, and forward to the Authority proof of
liability insurance coverage and Workmen's Compensation coverage, if required.
CARRIED;
7. FINANCIAL REPORT AND ACCOUNTS
-May, 1979
Mr. Scott presented the Financial Report and Accounts for the month of May,
1979.
Res. 1250 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Financial Statement for the month of May, 1979, be
received: and that payment of the Authority accounts, in the amount of
$844,445.52, being (a) Current Expenditures - Wages and Salaries $3l9,l85.72,
Materials and Supplies $l39,254.49: (b) Capital Expenditures - Wages and
Salaries $3l,044.0lJ Materials and Supplies $349,332.46: (c) Other Programs -
Wages and Salaries $5,621.24: Materials and Supplies $7.60, be approved.
CARRIED,
8. REPORT 12/79 - HISTORICAL SITES
ADVISORY BOARD
Report 12/79 of the Historical Sites Advisory Board was presented.
Res. 125l Moved by: J.S. Scott
Seconded by: Mrs. J. A. Gardner
RESOLVED THAT: ,Report 12/79 of the Historical Sites Advisory Board be
received, and
THAT Recommendation is of Report 12/79 of the Historical Sites Advisory Board,
as contained therein and set forth herein, be not approved:
'5 At least two, and preferably three, members of the Historical
Sites Advisory Board be appointed members of the Black Creek
Pioneer Village Visitor Centre Building Sub-Committee.
CARRIED,
Res. 1252 Moved by: M.W.H. Biggar
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Recommendations Il, 12, 13 and '4, as contained therein, and
as amended and set forth herein, be adopted:
tl The Restoration Programme at the Black Creek Pioneer Village
continue in order to complete the followin~ facilities:
.Richmond Hill Manse
. Sawmill
.Sawyer's House
.Cooper's Shop
E Consideration be given to extending the northern boundary of
the Black Creek Pioneer Village property to the C.N. Railway
line to include the property with the house, which is within
the Village periOd, should the property beco~e available.
f3 Should the valley lands south of Shoreham Drive to Finch
Avenue be transferred to Metropolitan Toronto for management
under the Authority's agreement, the development of the lands
be for passive recreation uses only: and
-5- B-l9b
THAT the transfer be subject to Metropolitan Toronto agreeing
to adequately maintain and supervise the area under the
Authority's agreement: and further
THAT the right of access from Black Creek Pioneer Village to
the Indian Village Site be retained and that the Indian
Village Site be preserved for future study and development.
!! In the long-term planning for the Black Creek Pioneer Village,
that consideration be given to converting the Dalziel area to
a stock barn and farm7 and
THAT the pioneer agricultural artifacts presently located in
the Dalziel area be retained and properly displayed in that
area. CARRIED;
9. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Kitchen Equipment
A staff communication was presented advising that the following quotations
have been received for the supply, delivery and set-up of kitchen equipment
for the Lake St. George Conservation Field Centre:
Kitchen Equipment
Restaurant Range - 4 burner 36" griddle - 2 ovens
Super Fryer
Soiled Dish-Tabling/Drainboard Pre-rinse Sink - Faucet
Slanted Dish Rack Shelf
Dishwasher: Blakeslee Model
Booster: Blakeslee Model
Steam Exhaust Hood
Clean Dish Tabling (Pot Sink)
Refrigerated Display Case
24ft utility Unit
Steam Table
Tublar Tray Sheet
Tray Cart (2 section) Quotation
Hercules Kitchen Equipment $16,134.00
J & F Distributors $13,658.00 (payaent within
7 days)
LeBlanco Kitchen Equipment $15,497.00
Res. 1253 Moved by: Mrs. F. Gell
Seconded by: E.H. Card
RESOLVED THAT: The quotation received from J & F Distributors for the supply,
delivery and set-up of kitchen equipment for the Lake St. George Conservation
Field Centre, be accepted7 it being the lowest quotation received.
CARRIED,
10. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Agreement
A staff communication was presented having regard to a proposed agreement
between The Metropolitan Toronto and Region Conservation Authority and The
Metropolitan Toronto School Boards, the Metropolitan Separate School Board and
the York County Board of Education for the establishment and operation of the
Lake St. George Conservation Field Centre.
Res. '254 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
RESOLVED THAT: The agreement between The Metropolitan Toronto and Region
Conservation Authority and the Metropolitan Toronto School Boards, the
Metropolitan Separate School Board and the York County Board of Education, to
establish and operate the Lake St. George Conservation Field Centre, be
approved 7 and
THAT the appropriate Authority officials be authorized and directed to sign
the necessary document to give effect thereto.
CARRIED,
B-l97 -6-
11. REPORT OF THE WORKING GROUP ON THE MANDATE AND
ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO
A staff communication was presented advising that a communication has been
received from The Honourable James A.C. Auld, Minister of Natural Resources
with reference to the Report of the Working Group on the Mandate and Role of
the Conservation Authorities of Ontario.
Staff has reviewed and compared this document to previous drafts and Authority
recommendations in this connection (Executive Resolution #44l/78). The
present document has been revised in order to recognize all of the concerns of
the Authority.
Res. 1255 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: The communication from The Honourable James A.C. Auld,
Minister of Natural Resources and the Report of the working Group on the
Mandate and Role of the Conservation Authorities of Ontario be received and
the communication from the Minister, under date of May 3l, 1979, be appended
as Schedule "B" of these Minutes: and
THAT copies of the Minister's letter and the Report be circulated to the
Authority's member municipalities for comment by August 15, 1979~
AND FURTHER THAT following receipt of municipal comments, staff be directed to
prepare a report and recommendations for consideration by the Executive
Committee.
CARRIED;
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Monarch Construction Limi ted .
To construct a storm sewer outfall into the Bruce Creek,
a tributary of the Rouge River, just east of Kennedy Road,
south of l6th Avenue, Town of Markham.
A staff communication was presented advising that an application has been
received for permission to construct a storm sewer outfall at the above
location.
Res. 1256 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of
Monarch Construction Limited, be received: and
THAT the application of Monarch Construction Limited for a permit to undertake
the construction of a storm sewer outfall into the Bruce Creek, a tributary of
the Rouge River, in the area just east of Kennedy Road, south of 16th Avenue
in the Town of Markham (The Regional Municipality of York), Rouge River water-
shed, be approved, subject to:
(a) All gabion works being preceded by a filter mat or a 6"-12" layer
of crushed stone:
(b) All areas disturbed due to construction beUng restored to the
satisfaction of the Authority and of the Town of Markham.
CARRIED;
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mrs. Linda McCarty
To construct an addition to residence on Lot 4, Plan
976, Town of Caledon (Humber River Watershed)
A staff communication was presented advising that an application has been
received for permission to construct an addition to the residence at the above
location.
Res. 1257 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The application of Mrs. L. McCarty, together with the staff
communication, be received: and
THAT the application of Mrs. L. McCarty for permission to construct an
addi tion to the kitchen of her residence on Lot 4, Plan 976, Town of Caledon
-7- B-198 '
(Humber River watershed), be approved, subject to:
(a) The applicant undertaking flood damage reduction measures to the
addition to provide protection to the regional flood level:
(b) The applicant complying with all municipal by-laws and regulations.
CARRIED,
l4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Borough of Etobicoke
To undertake restoration works on the eroding banks of
the Renforth Creek as it flows through Bloordale and
Neilson Parks, from Bloor Street south to Markland Wood
Golf Club (Etobicoke Creek Watershed)
A staff communication was presented advising that an application has been
received for a permit to undertake remedial works at the above location.
Res. i 258 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of the
Borough of Etobicoke, be received: and
THAT the application of the Borough of Etobicoke for a permit to undertake
restoration works on the eroding banks of the Renforth Creek, as it flows
through Bloordale and Neilson Parks in the area from Bloor Street South to
Markland Wood Golf Club, Borough of Etobicoke (Etobicoke Creek watershed), be
approved, subject to:
(a) The ends of all gabion walls being keyed into the banks:
(b) Every effort being made to reduce silting of the creek during
construction,
(c) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED,
15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. Philip Epstein
TO construct an in-ground swimming pool at rear of 126
Beardmore Crescent, Lot l5, Plan M-l280, City of North
York (Don River Watershed)
A staff communication was presented advising that an application has been
received for a permit to construct an in-ground swimming pool at the above
location.
Res. 1259 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of Mr.
Philip Epstein, be received: and
THAT the application of Mr. Philip Epstein for permission to construct an in-
ground swimming pool at the rear of 126 Beardmore Crescent, on Lot 15, Plan
M-1280, City of North York (Don River watershed), be approved, subject to:
(a) All excavated material surplus to the site being removed from the site,
(b) All structures associated with the swimming pool being located near to
or abutting the existing dwelling:
(c) All efforts being made to avoid silting of the Don River during con-
struction:
(d) All work being done to the satisfaction of the Authority and of the
City of North York.
CARRIED,
B-l99 -8-
16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mrs. Edna Lisus
To cons~ruct an in-ground swimming pool at rear of 120
Knightswood Road, Lot 3l & Pt. Lot 32, Plan 3464, City
of North York (Don River Watershed)
A staff communication was presented advising that an application has been
received for permission to construct an in-ground swimming pool at the above
location.
Res. '260 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of Mrs.
Edna Lisus, be received: and
THAT the application of Mrs. Edna Lisus for permission to construct an in-
ground swimming pool at the rear of #20 Knightswood Road, City of North York
(Don River watershed), be approved, subject to:
(a) All excavated material surplus to the site being remQved from the site:
(b) All structures associated with the swimming pool being located near to
or abutting the existing dwelling:
(c) All efforts being made to avoid silting of the Don River during
construction:
(d) All work being done to the satisfaction of the Authority and of the City
of North York.
CARRIED:
17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. John R. Finlay
To construct an in-ground swimming pool at rear of 16
St. Margaret's Drive, City of North York (Don River
Watershed)
A staff communication was presented advising that an application has been
received from Mr. John R. Finlay for permission to construct an in-qround
swimming pool at the above location.
Res. '261 Moved by: Mrs. L. Hancey
.Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the application of Mr.
John R. Finlay, be received: and
THAT the application of Mr. John R. Finlay for permission to construct an in-
ground swimming pool at the rear of '6 St. Margaret's Drive, City of North
York (Don River watershed), be approved, subject to:
(a) All excavated material surplus to the site being removed from the site:
(b) All structures associated with the swimming pool being located near to
or abutting the existing dwelling;
(c) All efforts being made to avoid silting of the Don River during con-
struction:
(d) All work being done to the satisfaction of the Authority and of the City
of North York.
CARRIJ!lD;
l8. CITY OF NORTH YORK
-Request for Reconveyance of Land
A staff communication was presented advising that a request has been received
from the City of North York for reconveyance of a small strip of land which
was conveyed to the Authority on May 27, 1968, together with several other
parcels located in the Black Creek valley.
The Authority land affected contains 0.04 acres, being composed of lane
between Lots 273 and 274, Registered Plan 4439, City of North York. Said land
is part of a larger acreage acquired from the City of North York under Project
P.8.A for the nominal consideration of $2.00.
-9- B-200
Res. #262 Moved by: M.W.H. Biggar
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A parcel of Authority-owned land, containing 0.04 acres, more
or less, be reconveyed to the City of North York. Said land being composed of
lane between Lots 273 and 274, Registered Plan 4439, City of North York, The
Municipality of Metropolitan Toronto. Consideration to be the nominal sum of
$2.00, plus all legal, survey and other costs involved in completing the
transaction: and
THAT said conveyance be subject to an Order-in-Council being issued in accord-
ance with Section 20 (c) of The Conservation Authorities Act, R.S.O. 1970,
Chapter 78 as amended:
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
docwnents.
CARRIED;
19. DISPOSAL OF SURPLUS AUTHORITY-
OWNED LAND: CITY OF BRAMPTON.
A staff communication was presented advising that on September 29, 1964, the
Authority acquired lOO.527 acres of land from W. & E. Inch. The lands
acquired included flood plain and valley lands, table lands required for the
Claireville Dam and Reservoir project, and additional table land fo~ing part
of the owners' holdings.
The Ministry of Transportation and Communications, on April 30, 1971, acquired
1.696 acres of the above-mentioned property for the reconstruction of Highway
'7 and the Ninth Line, leaving a small, isolated parcel of Authority-owned
table land containing 0.409 acres separated from the remainder of the
Authority's holdings.
The Authority has recently received an inquiry from an adjacent owner
regarding a possible purchase of a portion of the subject property.
The Conservation Land Management Division, the Water Resource Division and the
Director of Planning and Policy have reviewed this location in relation to the
Authority's land requirements, and recommend that the isolated parcel of
Authority-owned land situate on the east side of the Ninth Line, and a further
30-acre table land portion of the former W. & E. Inch property fronting on the
west side of the Ninth Line be considered as surplus to the requirements of
the Authority and that these lands be publicly advertised for sale.
Res. '263 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff communication having regard to the disposal of two
parcels of table land, being parts of the former W. & E. Inch property, con-
sisting of 0.409 acres, more or less, situate on the east side of the Ninth
Line, and a 30-acre, more or less, parcel fronting on the west side of the
Ninth Line, being Parts of Lot 4, Concession IX (N.D.), City of Brampton, be
received: and
THAT consideration of this matter be deferred tb the next regular meeting of
the Executive Committee scheduled for Wednesday, July 11, 1979.
CARRIED,
NEW BUSINESS
20. FIRST BOLTON SCOUT HUT,
VILLAGE OF BOLTON,
TOWN OF CALEDON
The Executive Committee considered the request of the Town of Caledon for
permission to remove from the lands of the Bolton Community Conservation
Centre (Dick's Dam Park) the debris of the First Bolton Scout Hut, which was
destroyed by fire in 1978.
Res. '264 Moved by: Mrs. F. Gell
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The request of the Town of Caledon for permission to remove
from the lands of the Bolton Community Conservation Centre (Dick's Dam Park)
the debris of the first Bolton Scout Hut, which was destroyed by fire in 1978,
be approved.
CARRIED,
B-20l -lQ-
21. BLACK CREEK PIONEER VILLAGE
-Visi to:!: Centre
Res. 1265 Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: The Chairman of The Metropolitan Toronto and Region
Conservation Foundation be authorised to make a presentation to The Devonian
Group of Charitable Foundations for financial support for the construction of
the Black Creek pioneer Village Visitor Centre, as designed by Raymond
Moriyama.
CARRIED;
22. ADJOURNMENT
On Motion, the Meeting adjourned at 1:00 p.m.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
B-202
SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
JOINT MEETING
FINANCE AND PERSONNEL SUB-COMMITTEES
The Finance and Personnel Sub-Committees met in joint session at the Authority
Of fice , 5 Shoreham Drive, Downsview, Ontario on Monday, June l8, 1979, commenc-
ing at l:30 p.m.
PRESENT WERE
Chairman J.S. Scott
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
C.F. Kline
Mrs. 'S. Martin
Authority Chairman R.G. Henderson
Authority Vice Chairman Mrs. F. Gell
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
THE FOLLOWING ITEMS WERE DISCUSSED:
1). Proposed Management Study Review (Resolution 1210/79 of the Executive
Committee) :
2). Appointment of a Management Study Review Sub-Committee;
The Meeting recessed to discuss the proposed Management Study Review.
The Meeting reconvened at 4:00 p.m.
IT WAS AGREED THAT the undermentioned firms be advised of the adoption of
Resolution i2l0 of Executive Committee Meeting #8/79, as follows:
nRESOLVED THAT: Rather than consider a proposal to have a study made on a
data processinq evaluation and considering the financial restrictions being
imposed by the Province, Metropolitan Toronto and the respective regional
muni~ipalities, a Management Consultant be engaged to make a complete study
of the operations of The Metropolitan Toronto and Region Conservation
Authority, and that the scope and parameters be established by the Finance
Sub-Committee, and
THAT the cost of this study be financed first by the funds that would have
been provided for the data processing evaluation and the balance on a
deficit basis,
AND FURTHER THAT the Finance Sub-Committee interview Management Consultants
and receive presentations with the object in view of submitting to the
Executive Committee, at the earliest possible time, recommendations out-
lining the terms of reference for the management study and recommending the
hiring of a Management COnsultant as selected by the sub-committee,
AND FURTHER THAT the members of the Personnel Sub-Committee be invited to
participate in these discussions and recommendations."
The Canada Consulting Group
Currie, Coopers & Lybrand Limi ted
T.A. Croil Associates Limited
Harry Damp & Associates
Drake Executive
Ernst & Ernst Chartered Accountants
Hickling & Johnston Limited
IBI Group
Josef Kates Associates Inc.
Peat Marwick & Partners
B-203
-2-
Price Waterhouse Associates
P.S. Ross & Partners
Stevenson & Kellogg
Thorne Riddell Associates Limited
AND FURTHER THAT they be requested to advise the Authority, by July 6, 1979, of
their credentials for the undertaking of such a study and of their interest in
undertaking the proposed study, and of their willingness to submit a formal
proposal to the Authority at a later dateJ
AND FURTHER THAT the Committees suggest that the following areas be considered.
1) . Staff organization and structure;
2) . Operations' management;
3) . Human resourceSJ
4) . Finance and controlJ
5) . Systems and procedures.
1'1' WAS AGREED AND THE COMMITTEE RECOMMENDS THAT:
'1'he Executive Committee appoint a Management Study Review Sub-Committee; and
THAT the members of the committee be the members of the Personnel and Finance
Sub-Committees;
AND FURTHER THAT The Chairman of the Finance Sub-Committee be the Chairman of
the Management Study Review Sub-Committee:
AND FURTHER THAT The Municipality of Metropolitan TOronto be added to the list
of consultants who are invited to submit a proposal to the Management Study
Review Sub-Committee.
J.S. Scott K.G. Higgs
Chairman, Finance Sub-Committee Secretary-Treasurer
KC.
1979.06.18
B-204
~~~ SCHEDULE "B"
{$} LETTER SENT TO ALL CONSERVATION AUTHORITIES
CHAIR}1EN bee Secretary-Treasurers
...~~
Onlano
omu 01 the Ministry of [M~@~~Wrn[ID 416/965-1301 Whitney Block
Minister Natural Queen's Park
Resources JUN 15 1919 Toronto Ontario
M, T, R. C. A. May 31, 1979
Dear
1 am pleased to forward to you a copy of the
Report of the Working Group on the Mandate and Role of
the Conservation Authorities of Ontario.
As you are aware, the preparation of this
report was undertaken in response to concerns expressed
by municipalities, various ministries of government and
the Conservation Authorities themselves, regarding the
future structure and direction of the Conservation
Authorities' program. In light of these concerns my
predecessor, the Honourable Frank S. Miller, in
conjunction with the Executive Committee of the Chairmen's
Committee of Ontario Conservation Authorities, agreed to
establish a working group to review the programs of the
Conservation Authorities, to clarify their role in watershed
management and to develop a sound policy framework to guide
future program development.
The recommendations of this working group are
outlined in the enclosed report. Since implementation of
these recommendations could have a far reaching effect on
the nature of resource management in the province, 1 want
to be assured that all interested parties have an opportunity
to input to the review of this document. As a result, the
report is being circulated to all Conservation Authorities,
all ministries of the provincial government, municipal
organizations and other interested groups for review and
commen to Based upon this review my ministry will prepare
recommendations to the Cabinet regarding the mandate and
role of the Conservation Authorities.
1 am particularly concerned that each Conservation
Authority and its member municipalities thoroughly review
the report and provide me with their comments. In this
regard, 1 would request that each Conservation Authority
provide copies of the report to its member municipalities,
review the recommendations with the municipalities and
ensure that municipal concerns and comments are included in
the Authority's response to the document. Staff of the
Ministry of Natural Resources will be available to assist
the Authorities, if required.
. . ./2
B-20S
-2- May 31. 1979
After discussion with the Executive Committee
of the Chairmen's Committee of Ontario Conservation
Authorities, it was agreed that responses should be
forwarded to Mr. R. J. Burgar, Director, Conservation
Authorities Branch within (60) days of receipt of the
report.
I know that you will agree with me that the
Report of the Working Group on the Mandate and Role of
Conservation Authorities provides a useful basis for
discussion of the future responsibilities of the
Conservation Authorities and I trust that you will take
the opportunity to provide us with your views on these
important recommen~ations.
With personal regards.
Yours sincerely.
~~.~ ~
ames A. C. Auld
Encl.
~ B-206
,
the metropolitan toronto and region conservation authority
minutes Report nO/79
EXECUTIVE COMMITTEE WEDNESDAY-JULY-ll-l979 nO/79
The Executive Committee met at the Caledon home of Mr. M. J. Breen on wednesday,
July 11, 1979, commencing at lO:OO a.m.
PRESENT WERE
Vice-Chairman Mrs. F. Cell
Members M.J. Breen
E.H. Card
R. Fitzpatrick
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
F.R. Perkins
J.S. Scott
Secretary-Treasurer K.G. Higgs
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Water Resource D~vision M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Admir.~stration Division W.E. Jones
Research Planner, Planning & policy Mrs. A.C. Deans
Head, Waterfront Section, WRD B.E. Denney
Head, Information Section, I&ED P.A. Head
Development Coordinator, Planning & Policy J.W. MaleUch
Senior Administrative Secretary Mrs. M. Mitchell
Senior Secretary - Finance Division Mrs. W. Robertson
ABSENT WERE
Chairman R.G. Henderson
Members M.W.H. Biggar
Mrs. J.A. Gardner
MINUTES
The Minutes of Meeting #9/79 were presented.
Res. #266 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Minutes of Meeting #9/79, as presented, be adopted as if read.
CARRIED J
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
1. QUOTATION #79-3l
-Fu,el Oil Supply
A staff communication was' presented advising that the following quotation
B-207
-2-
had been received from Texaco Canada Incorporated for the supply and
delivery of fuel oil as required during the 1979-80 heating season:
CUR R E N T
POSTED PRICE PER NET PRICE PER VOLUME DISCOUNT
LOCATION GALLON GALLON PER GALLON
Black Creek,
Boyd,
Bruce's Mill $0.639 $0.549 $0.09
Claireville,
Heart Lake $0.639 $0.589 $0.05
All other
locations $0.648 $0.598 $0.05
The quoted net prl.ce is subject to any future increases in the posted tank
wagon price.
Res. #267 Moved by: E.V. Kolb
Seconded by: R. Fitzpatrick
RESOLVED THAT: The quotation received from Texaco Canada Incorporated for
the supply and delivery of fuel oil to the Authority facilities at the net
price of $0.549 per gallon for Black Creek, Boyd and Bruce's Mill, $0.589
per gallon for Claireville and Heart Lake, and $0.598 per gallon for all
other locations, subject to future increases in the posted tank wagon price,
be accepted.
CARRIED;
2. 1979 BUDGET REVISIONS
CONSERVATION & RECREATION LAND MANAGEMENT - CONSERVATION AREAS
(DEVELOPMENT)
A staff communication was presented advising that an evaluation of various
projects identified in the previously adopted budget of the A~thority has
resulted in a reallocation of the funds provided for facility development
in conservation areas. These reallocations will not affect the total
funding requirements for the 1979 Conservation Area Development Program.
Res. #268 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: The 1979 Budget Revisions for the reallocation of funding
for the Conservation and Recreation Land Management - Conservation Area
Development program, as appended as Schedule "A" of these Minutes, be
approved.
CARRIED,
3. PROPOSED SPECIAL PROJECT
- Stream Enhancement
A staff communication regarding a proposed agreement with the Ontario
Ministry of Natural Resources for special funding for stream enhancement
work was presented.
Res. #269 Moved by: C.F. Kline
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication regarding a proposed agreement with
the Ontario Ministry of Natural Resources for special funding for stream
enhancement work be received: and
THAT the proposed stream enhancement work be considered a special project
of the Authority, with the total funding being provided by the Ministry of
Natural Resources; and
FURTHER THAT the staff be directed to 'prepare a suitable agreement with
the Province of Ontario and that the appropriate Authority officers be
authorized to sign the necessary documents.
CARRIED:
B-208
-3-
4. C.O.E.O. CONFERENCE AND RESIDENTIAL WORKSHOP
SEPTEMBER 26-28, 1979, TAWINGO OUTDOOR CENTRE
-Attendance at
Res. 1270 Moved by: E.V Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Messrs. Terry Carr, Ron Hudson, Andy Wickens, Miss Jean
Wansbrough and Miss Brenda Wright, be authorized to attend the C.O.E.O.
Conference and Residential Workshop at the Tawingo Outdoor Centre, in
Huntsville, Ontario, September 26 - 28, 1979 and that their estimated
expenses in the amount of $50.00 each, plus travelling costs, be paid.
CARRIED,
s. DISPOSAL OF SURPLUS AUTHORITY-
OWNED LANDS: CITY OF BRAMPTON
A staff communication was presented advising that on September 29, 1964,
the Authority acquired lOO.527 acres from W. and E. Inch. The lands
acquired included flood plain and valley lands, tablelands required for
the Claireville Dam and Reservoir project, and additional tableland
forming part of the owners' holdings.
The Ministry of Transportation and Communications on April 30, 1971,
acquired l.696 acres of the above mentioned property for the reconstruc-
tion of Highway #7 and the Ninth Line, leaving a small, isolated parcel of
Authority-owned tableland containing 0.409 acres separated from the
remainder of the Authority's holdings.
The Authority has recently received an inquiry from an adjacent owner
regarding a possible purchase of a portion of the subject property.
The Conservation Land Management Division, the Water Resource Division and
the Director of Planning and policy have reviewed this location in relation
to the Authority'S land requirements, and recommend that the isolated parcel
of Authority-owned land situate on the east side of the Ninth Line, and a
further 30-acre tableland portion of the former W. & E. Inch property
fronting on the west side of the Ninth Line be considered as surplus to the
requirements of the Authority and that these lands be publicly advertised
for sale.
Res. '271 Moved by: Mrs. S. Martin
Seconded by: J.S. Scott
RESOLVED THAT: Two parcels of tableland being Parts of the former W. and
E. Inch property consisting of an isolated parcel containing 0.409 acres,
more or less, situate on the east side of the Ninth Line, and a 30-acre,
more or less, parcel fronting on the west side of the Ninth Line be
considered as surplus to the requirements of the Authority. Said lands
being Parts of Lot 4, Concession IX, (Northern Division) City of Brampton,
formerly Township of Toronto Gore, Regional Municipality of Peel, and;
THAT the availability of these parcels of surplus lands be circulated to
the various Provincial Ministries, The Regional Municipality of Peel and
the City of Brampton to determine whether they have any interest in
acquiring these lands at market value and failing which:
THAT the Secretary-Treasurer be directed to advertise these lands for sale
by public tender, andJ
FURTHER THAT The Chairman and Vice-Chairman of the Authority and the
Chairman of the Flood Control and Water Conservation Advisory Board be
appointed a committee to open the tenders and report to the Executive
Committee with a recommendation.
CARRIEDr
6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
HIGHLAND CREEK WATERSHED COMPONENT - PROPERTY:
CEDAR HEIGHTS CONSTRUCTION LIMITED
Res. #212 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: The Report (June 28, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
B-209
-4-
authorized and directed to complete the purchase.
CARRIED;
aRe: Project: Interim Water and Related Land Management project
1979-l98l - Flood Plain and Valley Land Acquisition
Component - Highland Creek Watershed
Authority: Executive Resolution No. l33, Meeting No. 4 -
April l2, 1978 and Authority Resolution No. 5l,
Meeting No. 3 - April 2l, 1978
Subject Property: East side of Centennial Road
Owner: Cedar Heights Construction Ltd.
Area to be
Acquired: l.450 acres, more or less
Recommended
Purchase Price: $6,000.00 plus Vendor's legal costs.
"Included in the requirements for the above noted project is an irregular
shaped parcel of land being all of Block "A", Registered Plan 8652, Borough
of Scarborough, Municipality of Metropolitan Toronto, located on the east
side of Centennial Road, south of Lawrence Avenue East.
"Negotiations have been conducted with Officials of Cedar Heights
Construction Ltd. and their solicitor Mr. Sidney Freedman, 500l Duf ferin
Street, Thornhill, Ontario, L4J 2K2, and, subject to the approval of your
Committee, agreement has been reached with respect to a purchase price.~s
follows:
The purchase price is to be the sum of $6,000.00 plus Vendor's legal
costs with date of completing the purchase to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidential to the closing, for land transfer tax, legal costs and
disbursements are to be paid. The Authority is to receive a conveyance of
the land required free f~om encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
7. REQUEST FROM THE MUNICIPALITY OF METROPOLITAN
TORONTO FOR A RELIEF TRUNK SEWER EASEMENT
A staff communication was presented advising that a request had been
received from The MQnicipality of Metropolitan Toronto to provide a
permanent easement for a Relief Trunk Sewer required in the Massey Creek
Valley, west of Kennedy Road, south of Eglinton Avenue.
Res. t273 Moved by: J.S. Scott
Seconded by: F.R. Perkins
RESOLVED THAT: A permanent easement be granted to The Municipality of
Metropolitan Toronto, required for construc~ion of a Relief Trunk sewer, in
the Massey Creek Valley, west of Kennedy Road, south of Eglinton Avenue.
Said easement is shown as Parts 3, 7 and 8, Plan 64R-2l22. The Au~ority-
owned land affected is Part of Lot 29, Concession 'C', Borough of Scar-
borough, Municipality of Metropolitan Toronto. Said easement to be granted
for the nominal consideration of $2.00, subject to The Municipality of
Metropolitan Toronto being responsible for carrying out and paying all legal,
survey and other costs involved in the transaction, and:
FURTHER THAT the appropriate Authority officials be authorized and directed
to sign the necessary documents to give effect thereto.
CARRIED,
8. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
ROUGE RIVER WATERSHED COMPONENT - PROPERTY:
J.D. McCULLOVGH
Res. t274 Moved by: E.H. Card
Seconded by: R. Fitzpatrick
RESOLVED THAT: The Report (June 25, 1979) set forth herein, received from
B-210
-5-
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED;
"Re: Project: Interim Water and Related Land Management Project
1979-l98l - Flood Plain and Valley Land
Acquisition Component - Rouge River Watershed
Authority: Executive Resolution No. l33, Meeting No. 4 -
April l2, 1978 and Authority Resolution No. 5l,
Meeting No. 3 - April 21, 1978
Subject Property: West side of Rougemount Drive
OWner: J.D. McCullough
Area to be
Acquired: 0.200 acres, more or less
Purchase Price: $7,000.00 plus Vendor's legal costs.
"Included in the requirements for the above noted project is an irregular
shaped parcel of land being Part of Lots 55, 56 and 57, Registered Plan
283, Town of Pickering, Regional Municipality of Durham, being a partial
taking from the rear of a larger residential property fronting on the west
side of Rougemount Drive in the lower Rouge Area.
"Negotiations have been conducted with the owner and, subject to the
approval of your Committee, agreement has been reached with respect to a
purchase price as follows:
The purchase price is to be $7,000.00 plus Vendor's legal costs, with
the purchase to be finalized and the funds paid over during 1980.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidential to the Closing, for land transfer tax, legal costs and
disbursements are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
9. REQUEST FROM THE TOWN OF VAUGHAN
- Storm Sewer Easement
A staff communication was presented advising that a request had been
received from the Town of Vaughan, to provide a permanent easement for a
Storm Sewer required east of Keele Street, south of Langstaff Sideroad.
Res. #275 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: A permanent easement be granted to the Town of Vaughan,
required for construction of a Storm Sewer, east of Keele Street, south of
Langstaff Sideroad. Said easement is shown as Part 1 on Plan 66R-l0870.
The Authority-owned land affected is Part of Block "A", Plan M-l80l, Town
of Vaughan, Regional Municipality of York. Said easement to be granted for
the nominal consideration of $2.00 subject to the Town of Vaughan being
responsible for carrying out and paying all legal, survey and other costs
involved in the transaction, and;
FURTHER THAT the appropriate Authority officials be authorized and directed
to sign the necessary documents to give effect thereto.
CARRIE.D'
10. FLOOD PLAIN MAPPING COVERAGE
A staff communication was presented discussing the extent of the Authority's
current mapping prog~am and clarifying the Authority's ability to review
plan proposals within areas not being mapped.
Res. #276 Moved by: Mrs. S. Martin
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff report on Flood Plain Mapping Coverage be
received.,
CARRIED,
B-211 -6-
11. WATERFRONT PROJECT 1977-l98l
ADDITIONAL FUNDING
-Shoreline Management
The Executive Committee discussed letters from Mr. P.J. Yakabuski,
Parliamentary Assistant to the Minister of Natural Resources, regarding
the representation of the City of Toronto and the Borough of Scarborough
regarding additional funding for The Metropolitan Toronto and Region
Waterfront Project 1977-l98l.
Res. 1277 Moved by: Mrs. S. Martin
. Seconded by: Mrs. L. Hancey
RESOLVED THAT: The responses from the Ministry of Natural Resources
respecting shoreline management be received and sent to the City of
Toronto, the Borough of Scarborough and The Municipality of Metropolitan
Toronto. CARRIEDr
l2. AQUATIC PARK: RESOLUTION OF MAIN ISSUES
The staff submitted a report and recommendations regarding Aquatic Park:
Resolution of Main Issues.
Res. #278 Moved by: M. J.. Breen
Seconded by: Dr. T.R. Leith
RESOLVED THAT: The staff report regarding Aquatic Park: Resolution of
Main Issues be received and appended as Schedule liB" of these Minutes,
and the recommendations set forth herein be adopted.
CARRIED;
l3. WATERFRONT PROJECT 1977-l98l
HUMBER BAY EAST WATERFRONT AREA
- Buildings and Structures Contract
Change Order #1
A staff communication was presented advising that the Authority was in
receipt of correspondence from the Authority's consultant, Johnson
Sustronk Weinstein and Associates Limited, requesting approval of Change
Order #1 to the above noted contract.
Res. 1279 Moved by: M.J. Breen
Seconded by: E.V. Kolb
RESOLVED THAT: Change Order II involving a decrease in the contract value
of $l6,788.35 be approved subject to the approval of the Province of
Ontario. CARRIED:
14. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
_ Proposed Slope Instability Monitoring Program - Nos. 9 to 11
Sulkara Court, City of North York, Don River Watershed
A staff report and supporting correspondence from consultants were
presented with regard to a slope instability problem at the above location.
Res. #280 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff be authorized to retain the firm of Golder
Associates, Consulting Geotechnical Engineers, to help carry out a slope
instability monitoring program at the rear of Nos. 9 to II Sulkara Court,
City of North York, Don River Watershed, at a cost estimated to be
$3,000.00, and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
l5. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
- proposed Engineering Study - No. 55 Wynford Heights vicinity,
City of North York, Don River Watershed
A staff report was presented advising that as outlined in the staff report
"Erosion Control and Bank Stabilization in Metropolitan Toronto - 1979
Programme" approved by the Executive Committee at Meeting Il5/78, remedial
~~~~ is proposed to be carried out at No. 55 Wynford Heights vicinity in
B-212
-7-
Res. #28l Moved by: Dr. T.H. Leith
Seconded ~y: F.R. Perkins
RESOLVED THAT: The staff be authorized to retain the firm of Andrew
Brodie Associates Inc., Consulting Engineers, to carry out an engineering
study to determine the extent and causes of the erosion problem at No. 55
Wynford Heights vicinity, in the City of North York, Don River Watershed,
at a cost estimated to be $4,900.00: and
THAT the Ministry of Natural Resources be requested to approve this study.
CARRIED,
l6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO
_ Engineering Design Services - Slope Instability at Nos. 9l-ll5
Weir Crescent and vicinity, Borough of Scarborough, Highland Creek
Watershed
A staff report was presented advising that as outl~ned in the staff report
"Erosion Control and Bank Stabilization in Metropolitan Toronto - 1979
Programme" which was approved by the Executive Committee at Meeting 115/78,
remedial work is proposed to be carried out at Nos. 9l-ll5 Weir Crescent
in 1980.
Res. 1282 Moved by: Mrs. L. Hancey
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff be authorized to retain the firm of Peto
MacCallum Ltd., Consulting Engineers, to provide engineering design services
for slOpe stabilization at Nos. 9l-llS Weir Crescent and vicinity, in the
Borough of Scarborough, Highland Creek Watershed, at a cost estimated to be
$lO,250.00, and
THAT the Ministry of Natural Resources be requested to approve this study.
CARRIED;
NEW BUSINESS
17. REPORT '2/79 - TENDER OPENING SUB-COMMITTEE
- Duffin Creek Channel Improvements
Town of Whitchurch-Stouffville
Duffin Creek Watershed
The Report of the Tender Opening Sub-Committee was presented.
Res. '283 Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: Report 12/79 of the Tender Opening Sub-Committee be received
and appended as Schedule "C" of these Minutes: and
THAT the Authority construct the Whitchurch-Stouffville Channel
Improvements in one phase in 1979, and,
ACCORDINGLY,the contract for this work be awarded to the'lowe~t proper
tender, Disher-Farrand Limited in the amount of $526,468.00. ",
CARRIED,
l8. FRENCHMAN'S BAY WATER AND SHORELINE PLANNING STUDY
-Town of Pickering
A staff communication was presented advising that the Authority was in
receipt of the aforementioned study from the Town of Pickering requesting
Authority comments by the end of July. The Authority's Master Plan for the
Bay was considered by the Town of Pickering and only the south-west corner
of Frenchman's Bay was approved.
Res. '284 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff report having regard to the Frenchman's Bay Water
and Shoreline Planning Study - Town of Pickering be received: and
B-2l3
-8-
THAT the staff report be approved and forwarded to the Town of pickering,
and~
FURTHER THAT the report be considered by the Waterfront Advisory Board at
its next meeting.
CARRIED,
19. NATIONAL MARINE EDUCATION ASSOCIATION CONFERENCE
- Attendance At
Res. #285 Moved by: F.R. Perkins
Seconded by: R. Fitzpatrick
RESOLVED THAT: Mrs. J.A. Gardner and one staff member, if desirable, be
authorized to attend the National Marine Education Association Conference,
at the University of Milwaukee, Wisconsin, August l6, l7 and l8, 1979 and
that their estimated expenses in the amount of $350.00 each be paid.
CARRIED,
20. APPOINTMENT OF SECRETARY
Res. 1286 Moved by: M.J. Breen
Seconded by: J.S. Scott
RESOLVED THAT: The Authority engage a secretary at Classification Level
4 for The Metropolitan Toronto and Region Conservation Foundation.
CARRIED :
21. Members of the Executive Committee and the staff conveyed their sincere
appreciation to Mr. and Mrs. Breen for their hospitality on this occasion.
22. ADJOURNMENT
On Motion, the Meeting adjourned at 11:55 a.m., July 11.
Mrs. F. Gell K.G. Higgs
Vice-Chairman Secretary-Treasurer
1 9 7 9 BUD GET REV I S ION S PAGE: 35
PROGRAM: Conservation & ReCJ:eation Land Managenent -Q:mservation Areas (Developnent) (Cl) DATE: Wednesday, July 11th, 1979.
PURPOSE: To realign fundinq to reflect projected a:mstructi.on oosts and to provide st:ru::tures that will increase services to
Calservation Area visitors and increase operatiala.l efficiency.
1979 OB.J'Ea'IVES: To develop facilities to penni.t increased attendance and enhance user experiences and :reduce operational oosts.
~: '1hi.s is a shared pmqram, SO\ of the funds being available fran the Province of <k1tario and the balance being funded
fran the General levy 00 all participating municipalities.
FINJ\NCIAL ~: Total fundinq remains the same.
CllJECl'IVE CU\SSIFICATIaS: Materials
Salaries Supplies & IIea1 Services Financial
& Wages Utilities Equiptlmt Property & Rents Ta2lE!S Expenses ~
$ $ $ $ $ $ $ $
l7,340 63,560 3,SOO - 42,100 - - 126,500
en
0
=
to2
t:I
C
t; 111
I
. N
)0 ....
= ...
lJl
I
- , ...,
....
1 9 7 9 BUDGET REV I S ION S U'I
PAGE: ~
ROGRAM: ~ICN & mx:REATICN LAND ~ - a:mERVATICN AREAS (rf.VEU)PMENl') (Cl) DATE: Wednesdav. Julv 11th. 1979
o RIG I N A L BUD GET REV I SED BUDGET I
Sources of Financing Sources of Financing
Net Provincial ~lunicipal Net Provincial Municipal
ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other
Albion Hills 43,600 2l,800 2l,800 - 40,400 20,200 20,200
Black Creek l,OOO 500 500 - l,OOO 500 500
Bruce's Mill l2,500 6,250 6,250 - 8,600 4, 300 4, ~OO
Clairevi1le - - - - 3,300 l,650 1,650
Cold Creek 29,000 l4,500 l4 , 500 - 38,000 19 , 000 19 ,000
Gl~n Haffy 8,500 4,250 4,250 - 8,500 4,250 4,250
Greenwood 3,200 l,600 l,600 - 3,200, l,600 1,600
Heart Lake 7,000 3,500 3,500 - 5,500 2,750 2,750
Petticoat Creek 8,000 4,000 4,000 - 8,000 4,000 4,000
Studies 7,500 3,750 3,750 - lO,OOO 5,000 5,000
General Development 6,200 3, lOO 3, lOO - - - -
; TOTAL l26,500 63,250 63,250 l26,500 63,250 63,250
B-216
SCHEDULE liB"
To: Executive Committee, M.T.R.C.A. #10/79
From: M. R. Garrett, Administrator, Water Resource Division
Re: AQUATIC PARK: RESOLUTION 9F MAIN ISSUES
BACKGROUND
At its meeting #6/76, the Authority adopted the following recommendations of its
Waterfront Advisory Board:
"The Master Plan for Aquatic Park be approved in principle
and forwarded to The Province of ontario for approval;
THAT The Province of Ontario jointly with The Municipality
of Metropolitan Toronto designate The Metropolitan Toronto
and Region Conservation Authority as the implementing agency
for Aquatic Park; and
SUBJECT TO THE APPROVAL OF THE PROVINCE OF ONTARIO:
THAT the development of Aquatic Park be funded as part of
the Metropolitan Toronto and Region Waterfront project
1977-l98l;
THAT the staff be directed to prepare an implementation plan,
taking into consideration the comments of all interested
agencies for Aquatic Park which sets out those items of
development which can reasonably be included within the
Waterfront project 1977-l98l, and their phasing, and those
items which can be funded by other levels of Government and
other agencies, including the private sector;
THAT in accordance with the direction of the Ministry of
Natural Resources and The Municipality of Metropolitan Toronto;
the Toronto Harbour commissioners be requested to assume
responsibility for the armouring of the outer shoreline, and
that the Authority support the Toronto Harbour Commissioners
in any submission for funding to The Government of Canada in
this connection;
THAT the Authority obtain, for a nominal sum, those land and
water areas required for the development and operation of the
Park;
THAT the Authority place the park lands under the existing
agreement with The Municipality of Metropolitan Toronto for
management and operation; and further
THAT The Municipality of Metropolitan Toronto enter into such
tri-party agreements as may be necessary for the management of
specific elements within the Park."
The Plan was then circulated to Metropolitan Toronto for their. comment and
approval. Metropolitan Toronto sent the Plan to the City of Toronto Planning
Board for their comments;' these were considered along with those from other
interested groups, and on May 3, 1977, the Council of the Muni'cipality of
Metropolitan Toronto adopted the following recommendations of their Parks
Committee:
B-217
To: Executive Committee #10/79
Re: Aquatic Park: Resolution of Main Issues PAGE 2
al. Metropolitan Toronto now recognize the Master Plan for
Aquatic Park prepared by The Metropolitan Toronto and
Region Conservation Authority as an appropriate conceptual
aspect of the Metropolitan Waterfront Plan;
2. Metropolitan Toronto now join with The Metropolitan Toronto
and Region Conservation Authority in discussions with the
Province of Ontario to determine:
(a) the disposition of the water lots in and adjacent to
the area in question;
(b) the degree of financial involvement of the Province
in future development of the area;
(c) the designation of The Metropolitan Toronto and
Region Conservation Authority as the implementing
agency for development work, and Metropolitan Toronto
as an eventual "benefiting municipality", and
(d) that title to the land mass be secured by The
Metropolitan Toronto and Region Conservation Authority
at nominal cost to the corporation;
3. Metropolitan Toronto join with The Metropolitan Toronto and
Region Conservation Authority and the Toronto Harbour
Commissioners in discussions with the Federal Government with
respect to that government or its designated agency providing
shore protection to the south shoreline of Aquatic Park at no
cost to the Metropolitan Corporation;
4. The City of Toronto be requested to secure a public roadway
to the site prior to any development proceeding;
5. Until the foregoing negotiations are concluded, that
Metropolitan Toronto not involve itself financially in any
aspect of development or operation;
6. Following resolution of the foregoing, that the development
of Aquatic Park be phased as an integral part of Waterfront
Development within the financial guidelines established from
time to time by the Metropolitan Council;
7. In the context of such Waterfront Development, The
Metropolitan Toronto and Region Conservation Authority be
requested to prepare a phased implementation plan related to
the consultants' Master Plan for approval by Metropolitan
Toronto and the City of Toronto prior to any work related to
detailed implementation proceeding,
II
...........
Subsequently, the Plan was sent to the Province of Ontario for their comment and
approval. On July 4, 1977, The Ministry of Natural Resources responded with
approval in principle and designating the Authority as "interim ~plementing
agency." Subsequently, on January 24, 1978, the Authority received another
letter from the Minister containing Cabinet approval of the Plan and indicating
that:
n...... title of the lands and waters required for this Park
be transferred to the Authority as soon as the matter of
armouring the external shoreline by the Federal Government
is resolved."
S" 218
To: Ex~cutive Committee #10/79
Re: A~atic Park: Resolution of Main Issues PAGE 3
During the interval since approval, another issue has been raised: alleviating
the problems caused by siltation in the Keating Channel at the mouth of the Don
River. This issue was the subject of a recent report to the Authority which
recommended a three party cost sharing agreement for the dredging, with the
proviso that the dredgeate could be accommodated in a new endiked area on the
south side of Aquatic Park. The attached figure shows the location of the
endikement in relation to Aquatic Park. The complexity of Aquatic Park in terms
of the agencies involved, the range of uses proposed, the dredgeate disposal
area and the City's central waterfront planning process "make it imperative to
resolve the ownership and determine how the Park will be developed.
RESOWTION OF THE ISSUES
The two main issues that need to be resolved to the satisfaction of Metropolitan
Toronto and The Ministry of Natural Resources are:
1. Armouring the exterior shoreline at no cost to Metropolitan
Toronto or the Province of Ontario.
2. Acquisition of the land base required for the Park by the
Authority at a nominal cost.
After resolving these issues, the Authority, acting as implementing agency for
development, will be able to take full charge of the preparation of an orderly
implementation plan for the Park Which meets the desires of Metropolitan
Toronto and the City, while at the same time meeting Provincial objectives
respecting regional waterfront open space.
The Authority has been in discussion with the Federal Government through various
departments over the last two years; Fisheries and Environment, Public Works,
and Transport, to determine if any funding would be available for the exterior
armouring. All have indicated that the chances of obtaining the required $3.5
million are slight. Your staff, after considerable discussion with the Toronto
Harbour Commissioners' st~ff have come to the conclusion that the only feasible
way to satisfy the armouring requirement at no cost, is to carry out a landfill
and rubble operation; realigning the shoreline to a more stable angle and
armouring it with demolition rubble. The cost would be paid for by a charge
levied against the contractors using the site. This process would not negate
the need for land~cape armour stone to cover the rubble and to augment
protection where necessary; but it would mean a significant reduction in cost.
The only disadvantage with the scheme is timing; it will take ten to fifteen
B-2l9
To: Executive Committee #10/79
Re: Aquatic Park: Resolution of Main Issues PAGE 4
years to complete the job, however there does not seem to be any pressing
reason for accelerating the armouring at this t~e. The new endikement proposed
for dredge ate disposal is on a more stable angle than the original shoreline,
and will assist in the long term stabilization process.
Once there is agreement at all levels that the foregoing is a reasonable basis
to resolve the armouring issue; it is proposed that the Province of Ontario
transfer the waterlot for Aquatic Park and the endikement to the Authority for
a nominal swn. This will enable the Authority to get on with the planning and
development of the Park. Certain changes have occurred since the Authority's
development of a plan for the Park. Among these changes are: the dredgeate
disposal area, changes in the biological community, and forthcoming policies of
the City of Toronto Planning Board. The preparation of the Xmplementation Plan
will have to review the original concept in the light of what has happened and
develop a plan satisfactory to all government agencies to Which the Authority is
responsible.
OBLIGATIONS
The resolution of the armouring and title issues require the co-operation of the
affected parties. They do not work unless all agencies participate. In this
regard, there are certain obligations:
i) The Toronto Harbour Commissioners undertake the landfilling
and rubble operation required to stabilize the west and
south shores of the Aquatic Park and the new endikement for
whatever term is reqUired, with all costs being recovered
from a user charge. It is understood that the Toronto
Harbour Commissioners would agree:
(a) that all plans for stabilization and for the
endikement require the approval of Metro
Toronto and the Province of Ontario through
the Authority;
(b) that all normal costs associated with the
landfill operation will be covered, such as:
- monthly progress surveys and reports
- access maintenance and traffic control
- navigation markers
- liaison with the Ministry of the Environment;
(c) that fill will be provided at no charge to the
Authority, as required on a reasonable basis for
internal site development of the Park itself.
B-220
To: Executive Commi~tee #10/79
Re: Aquatic Park: Resolution of Main Issues PAGE 5
ii) The Toronto Harbour Commissioners is prepared to turn over
those of its lands required to accommodate a public road
allowance to the Park from Leslie Street.
iii) The Municipality of Metropolitan Toronto is prepared to
administer the inter~ public uses at the site and take
over its management when complete via the normal lease
arrangement with the Authority.
iv) The Province is prepared to transfer a water lot encompassing
Aquatic Park and the endiked area to the Authority for
nominal cost.
v) The Province is prepared to transfer at a nominal cost,
the waterlot encompassing the north part of the outer
Harbour to the Toronto Harbour Commissioners.
vi) The Authority, in accordance with established procedures
for waterfront development, will prepare plans for the
development of the site and circulate them for approval
by Metropolitan Toronto and through it, the City of Toronto,
as well as the Province of Ontario prior to carrying out
development.
vii) The Authority will carry out development as part of the
Waterfront Plan on the basis of 50:50 cost
sharing between Metropolitan Toronto, the Province of
Ontario, and within the priorities for waterfront
development as established by the Province of Ontario
and Metropolitan Toronto through the Authority.
It is clear that planning and implementing development at Aquatic Park is a
complex matter. There are many complicating and inter-relating factors which
will impact the Authority's involvement at this site. Not all of these ma~ters
have been addressed in this report, however, the main issues which need
resolution have been, and the solutions proposed are appropriate. It is
important for a single agency to take control of what is happening now and What
will happen at this site. It is also important that this agency reflect the
desires of its contributing municipalities and the Province. The Authority is
in a position to be able to perform in this matter if title is obtained.
B-221
To: Executive Committee #10/79
Re: Aquatic Park: Resolution of Main Issues PAGE 6
RECOMMENDATIONS
WHEREAS the Metropolitan Toronto and Region Conservation Authority has now been
able to satisfy the conditions of the Province of Ontario and the Municipality
of Metropolitan Toronto respecting the stabilization of the OUter Harbour
shoreline and the title of Aquatic Park on the basis:
1. That the Toronto Harbour Commissioners are prepared to undertake
the realignment and stabilization of the south and west shores
of the OUter Harbour Headland; and further that this arrangement
be formalized in a satisfactory agreement between the Authority
and the Toronto Harbour Commissioners.
2. That the Municipality of Metropolitan Toronto is prepared to
undertake interim management of the site during development and
is prepared to operate and maintain the park, when complete,
over the long term through the normal lease arrangement with
the Authority.
3. That the Toronto Harbour Commissioners is prepared to provide a
public right-of-way from the end of Leslie Street to the Park.
IT IS RECOMMENDED THAT: The Municipality of Metropolitan Toronto and the
Province of Ontario be advised that the Authority is prepared to undertake
implementation planning and development of Aquatic Park and the endikement
area as part of its Waterfront Development program; and
THAT the Province of Ontario be requested to act on the commitment set out
in the Ministry of Natural Resources' approval of Aquatic Park dated
December 30, 1977 and transfer title of the lands and waters required for
this Park to the Authority for a nominal swn; and subsequently
THAT the Authority enter into a ten year lease with the Toronto Harbour
Commissioners for the dredgeate disposal areas and endikement area, renewable
until the project is complete and stabilization has been achieved to the
satisfaction of the Authority as laid down in the agreement;
AND FURTHER THAT the Province of Ontario be requested to transfer the waterlot
enclosing the ship channels and the north portion of the OUter Harbour to the
Toronto Harbour Commissioners for a nominal swn in accordance with the request
contained in the Toronto Harbour Commissioners' letter dated December 29, 1976
that "prior to any further development taking place, the Commissioners insist
that the allocation of waterlots between the Toronto Harbour Commissioners for
Port purposes and the Authority for recreation purposes be agreed upon and
completed. II
Attachment:
1979.06.29
MRG/md
INNER HARBOUR SHIP CHANNEL
TORONTO ISLANDS
rr:::~:n: :I AREA ,., lIE TRAIISRIllIID
Lj. .. -l:I I'l1011 _NCZ 10 IITRCA
......~
FI:;'::~:}J AREA ,., IE TRANSfE....ED
,_ PIIOVINCE 10 THC
rrrriT1. AREA ,., IE LEASED
t;.L!1.! jj ,., THe BY IITReA
......... SIlDIlEUNE 10 IE ITA.UZED IY lIIC
~
,
the metropolitan toronto end region conservation euthority
100 ACRES
AQUATIC PARK
IOAC 7\ RESOLUTION OF TITLE AND ARMOURINO ISSUES blI
I
JUNE 1979 ..,
N
N
B-223 SCHEDULE "c"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
REPORT #2/79
of the
TENDER OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive,
Downsview on Wednesday, July 4, 1979, commencing at 2:00 p.m., to consider
tenders for Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville,
Duffin Creek Watershed.
PRESENT WERE
Chairman R. G. Henderson
Vice-Chairman Mrs. F. Gell
Chairman, R.D.H.P.
Advisory Board Mrs. S. 'Martin
Chairman, Flood Control &
Water Conservation
Advisory Board J. S. Scott
Kilborn Limi ted
Consulting Engineers N. H. Beesley
Staff K. G. Higgs
M. R. Garrett
J. C. Mather
The Committee was advised that twenty sets of documents were taken out by
contractors and seven tenders received, as follows:
Contractor Total Tender
Toronto Zenith Contracting Ltd. $540,090.00
Disher-Farrand Limited $548,480.00
Tacc Construction Co. Limited $60l,750.00
Elirpa Construction & Materials Ltd. $658,711.04
Lamco Construction Ltd. $695,665.00
G. C. Romano Sons (Toronto) Limited $717,125.00
Meca Mechanical Industries Limited $730,625.12
IT WAS AGREED, AND THE COMMITTEE RECOMMENDS THAT: All tenders received for
Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville, Duffin
Creek Watershed, be referred to the Consultants, Kilborn Limited, for their
review and report, with recommendations to the Executive Committee Meeting to
be held on Wednesday, July 11, 1979.
R. G. Henderson K. G. Hiqqs
Chairman Secretary-treasurer
July 10, 1979
JCM/md
C\.. B-224
,
the metropolitan toronto and region conservation authority
minutes Report '11/79
EXECUTIVE COMMITTEE WEDNESDAY-JULY-25-l979 '11/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, July 25, 1979, commencing at 10:00 a.m.
PRESENT FOR HEARING (1)
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.~.H. Biggar
M.J. Breen
E.H. Card
Mrs. J .A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. A. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. "McLean
Adm. - Information & Education T.E. Barber
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Research Planner, Planning & Policy Mrs. A.C. Deans
Development Co-ordinator, Planning & Policy J.W. Maletich
PRESENT FOR HEARING (2)
Chairman R. Grant Henderson
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. A. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education T.E. Barber
Adm. - Water Resource Division M.R. Garrett
Adm. - Finanqe Division A.D. Harris
Research Planner, Planning & policy Mrs. A.C. Deans
Development Co-ordinator, Planning & Policy J .W. Maletich
HEARINGS
Following the Roll Call, the meeting recessed to hold Hearings re:
(l) Mr. J.C. Enns -on behalf of-
Mr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.)
City of Brampton
Etobicoke Creek Watershed.
(2) M.M. Dillon Limited -on behalf of-
Runnymede Development Corporation Limited
City of Mississauga
Etobicoke Creek Watershed
Miss L. Trivelli recorded the proceedings of the Hearings.
B-225 -2-
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W .A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & Policy Mrs. A.C. Deans
Development Co-ordinator, Planning & Policy J.W. Maletich
Head-Flood Control Section, WRD J .C. Mather
Supervisor, Property Administration, P&AD D.J. Prince
MINUTES
The Minutes of Meeting 110/79 were presented.
Res. #287 Moved by: E.H. Card
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Minutes of Meeting #lQl79, as presented, be adopted as if
read.
CARRIED;
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF ~E
AUTHORITY AND RECOMMENDS ITS ADOPTION:
1. INFORMATION & EDUCATION DIVISION
-l979 Budget Revisions
Operations & Maintenance - Community Relations:
Information & Education Operations
A staff communication was presented having regard to adjustments to the 1979
Budget for the Information & Education Division.
Res. #288 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The 1979 Budget Revisions to Operations & Maintenance -
Community Relations: Info~ation & Education Operations be received and
appended as Schedule "A" of these Minutes, and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions to
Operations and Maintenance - Community Relations: Information & Education
Operations be included in the 1979 Budget Estimates of the Authority.
CARR1EDI.
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE
FOLLOWING' ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
-3- B-226
2. DECISION OF HEARING
-Mr. J.C. Enns -on behalf of-
Mr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.)
Ci ty of Brampton
Eto~icoke Creek Watershed
Res. '289 Moved by: J.S. Scott
. Seconded by: C .F. Kline
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this 25th day of July, 1979J and
THAT the application of Mr. J .C. Enns on behalf of Mr. Arthur Morrison
(Grace Retirement and Community Enterprises Inc.), in accordance with Ontario
Regulation 735/73, for permission to construct a senior citizens' apartment
building on Part of Lot 30, Brampton No.2, being the corner of Maple Street
and Nelson Street in the City of Brampton (Etobicoke Creek watershed), be
deferred until such time as the applicant is prepared to submit to the
Authority a site concept plan in accordance with the conditions as stated in
Section 6 (subsection 1) of Ontario Regulation 735/73. CARRIEDJ
3. DECISION OF HEARING
-M.M. Dillon Limited -on behalf of-
Runnymede Development Corporation L~ited
City of Mississauga
Etobicoke Creek Watershed
Res. '290 Moved by: Mrs. S. Martin
Seconded by: MrB. L. BaDCey
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Bearing held this 25th day of July, 1979; and
THAT the application of M.M. Dillon Limited on behalf of Runnymede DevelOp-
ment Corporation L~ited, in accordance with Ontario Regulation 735/73, for
permission to place fill in an area as defined on the SChedules and on the
flood plain of the Etobicoke Creek as defined by the Regional Storm on Lot 1,
Concession I, S.D.S., City of Mississauga (Etobicoke Creek watershed), be
refused for the following reasons:
.That ~e placing of fill as proposed will affect the control of flooding,
.That the creation of a parking lot on the flood plain of the Etobicoke
Creek will affect the conservation of land.
CARlUEDJ
4. REPORr '1/79 - SUB-COMMITTEE TO CONSIDER
DISPOSAL OF AUTHORITY-OWNED LAND
Report U/79 of the sub-committee appointed to consider disposal of surplus
Authority-owned land was considered.
Res. '291 Moved by: Mrs. F. Gell
Seconded by: J.S. Scott
RESOLVED THAT: The 53.204 acre parcel of surplus, vacant Authority-owned
land, being Part of Lot 32, Concession x, Town of Vaughan (The Regional
Municipality of York), being part of the former estate of George Groves'
property, not be sold at this time as the offer received is less than the
appraised value.
CARRIEDJ
5. STAFF FINANCIAL PROGRESS REPORT
-April I-June 30, 1979
) The staff presented a Financial Progress Report for the period April 1 - JUDe
30, 1979.
Res. '292 Moved by: C.F. IUine :
S~conded by: Mrs. J .A. Gardner
RESOLVED THAT: The Staff Financial Progress R~port for the period Apr~l 1 ~
June 30, 1979, be received and appended as Schedule -B- of theBe Minu~s.
CAlUtIEDJ
B-227 -4-
6. ALBION HILLS & BRUCE'S MILL CONSERVATION AREAS
-Quotation #79/34:
Cross Country Ski Equipment
A staff communication was presented advising that the following quotations
have been received for cross country ski equipment for the Albion Hills and
Bruce's Mill ski programs to replace damaged, worn-out or defective equipment:
SUPPLIER SKIS POLES 8OO'l'S BINDIR:;S
F. Badeau Ltee. 86 pro @ $30.10 129 pro @ $6.44 20 pro @ $3.75
62 pro @ $41.71
Donleigh Sales Ltd. 57 pro @ $6.62 107 pro @ $27.93
72 pro @ $8.33
X-C Skis Int. Ltd. 72.pr. @ $5.95 62 pro @ $13.50
R. Hcrt:on & Sons Ltd. 86 pro @ $48.00
62 pro @ $68.00
Mariano Sports 148 pro @ $42.50 l29 pro @ $8.00 62 pro @ $16.00
45 pro @ $17.60
Jem E. Neimi Ltd. 57 pr. @ $3.25 62 pro @ $10.80
72 pro @ $6.75 45 pro @ $11.30
>>II Canada Ltd. 86 pro @ $43.29
62 pro @ $55.67
Rukc of Canada Ltd. 72 pro @ $5.95 l07 pro @ $16.00
Res. '293 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotations of: F. Badeau Ltee for 86 pro of X-C skis at
$30.10 a pair and 62 pro of X-C skis at $41.71 a pair, and 20 pro of X-C
bindings at $3.75 a pair7 John E. Neimi for 62 pro of X-C boots at $10.80 a
pair and 45 pro of X-C boots at $11.30 a pair, and 57 pairs of X-C poles at
$3.~5 a pair7 Ruko of Canada for 72 pro of X-C poles at $5.95 a pair (total
acquisition, including Federal Sales Tax, $7,041.37) for the Albion Hills and
Bruce's Mill Cross Country Ski Programmes, be accepted.
CARRIED,
7. FINANCIAL REPORT AND ACCOUNTS
-June, 1979
Mr. Scott presented the Financial Report and Accounts for the month of June,
1979.
Res. '294 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Financial Statement for the month of June, 1979, be
received7 and that payment of the Authority accounts, in the amount of
$1,093,360.04, being (a) Current Expenditures'- Wages and Salaries
$361,765.827 Materials and Supplies $255,937.447 (b) Capital Expenditures -
Wages and Salaries $31,434.897 Materials and Supplies $422,180.357 (c) Other
Programs - Wages and Salaries $21,135.25; Materials and Supplies $906.29, be
approved.
CARRIED,
8. PROPOSED POLICIES: CO-ORDINATED PROGRAMME STRATEGY FOR
THE MINISTRY OF NATURAL RESOURCES IN SOUTHERN ONTARIO
A staff communication was presented advising that the Authority is in receipt
of the above report and a request from the Minister of Natural Resources for
comment by July 30, 1979.
A staff report on this matter was considered by the Executive Committee.
Res. 1295 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
-5- B-228
RESOLVED THAT: The staff report on the Proposed policies: Co-ordinated
Programme Strategy for the Ministry of Natural Resources in Southern Ontario,
a~ amended, be received and forwarded to the Ministry for consideration.
CARRIED;
9. ADMINISTRATION OF ONTARIO REGULATION 735/73
-March/April/May/June, 1979.
The staff presented a report concerning the administration of Ontario
Regulation 735/73 for the period March/April/May/June, 1979.
Res. 1296 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The report of the administration of Ontario Regulation 735/73
for the period March/April/May/June, 1979, be received and appended as
Schedule "c" of these Minutes.
CARRIED'
10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mrs. Ruth Kerbel
To undertake construction of storm sewer outfall into
the Wilket Creek between #74 and #76 The Bridle Path,
City of North York (Don River Watershed)
A staff communication was presented advising that an application has been
received from Mrs. Ruth Kerbel for permission to construct a storm sewer out-
fall into the wilket Creek at the above location.
Res. #297 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of
Mrs. Ruth Kerbel, be received~ and
THAT the application of Mrs. Ruth Kerbel for a permit to undertake the con-
struction of a storm sewer outfall into the Wilket Creek, in the area between
Nos. 74 and 76 The Bridle Path, City of North York (Don River watershed), be
approved, subject to:
(a) All gab ion works being preceded by a filter mat or a 6--12"
layer of crushed stone~
(b) Every effort being made to minimize silting of the creek
during construction;
(c) All areas disturbed due to construction being restored to
the satisfaction of the Authority and of the City of North
York.
CARRIED;
11 . APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Wallace P. Canivet Limited
To realign minor tributary of the Humber River, Lot 13,
Concession V, Town of Vaughan
A staff communication was presented advising that an application has been
received for permission to realign a section of a minor tributary of the
Humber River at the above location.
Res. 1298 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of'
Wallace P. Canivet Limited, be received~ and"
THAT the application of Wallace P. Canivet Limited for a permit to undertake
the realignment of a minor tributary of the Humber River in the area of Lot
13, Concession V, Town of vaughan (The Regional Municipality of York) Humber
River watershed, be approved, subject to: .
(a) Every effort being made to minimize silting of the creek during
construction;
B-229 -6-
(b) A filter mat or a 6"-12" layer of crushed stone preceding the
rip rap work;
(c) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(d) The Town of Vaughan Engineering Department being satisfied
. with the proposed work.
CARRIED;
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. A. Christie
To reshape existing slope in area of #67 Riverview
Heights, Borough of Etobicoke (Humber River Watershed)
A staff communication was presented advising that an application has been
received for permission to improve and reShape tbe bank at the above location.
Res. #299 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of Mr.
A. Christie, be receivedi and
THAT the application of Mr. A. Christie for a permit to place fill and to
rehabilitate the slope in the area of #67 Riverview Heights in the Borough of
Etobicoke (The M.Jnicipality of Metropolitan Toronto) Humber River watershed, be
approved, subject to:
(a) rill not exceeding 2S cubic yards of material, as indicated on
the proposali
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority and of th~ Borough of Etobicoke. CARRIE'D;
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Vaughan
For remedial works on a tributary of the West Don River
as it flows through Rockview Gardens, just east of Keele
Street, south of Highway #7, Town of Vaughan
A staff communication was presented advising that an application has been
received for permission to undertake remedial works on a tributary of the
West Don River at the above location.
Res. '300 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of the
Town of Vaughan, be receivedi and
THAT the application of the Town of Vaughan for a permit to undertake
remedial works on a tributary of the West Don River as it flows through
Rockview Gardens in the area just east of Keele Street, south of Highway '7,
Town of Vaughan (The Regional Municipality of York), Don River watershed, be
approved, subject to:
(a) Rip rap being placed at both upstream and downstream ends of the
proposed culverts;
(b) All gabion and rip rap works being preceded by a filter mat or a
6"-12" layer of crushed stone;
(c) Every effort being made to minimize silting of the river during
constructioni
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED,
-7- B-230
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
J. Weltman Investments
To construct parking lot and addition to existing ware-
house building, Codeco Court, City of North York
(Don River Watershed)
A staff communication was presented advising that an application has been
received for permission to construct a parking lot and proposed addition to
an existing warehouse building at the above location.
Res. *301 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of
J. Weltman Investments, be received~ and
THAT the application of J. Weltman Investments for permission ~o construct a
parking lot and an addition to an existing warehous~ building on Codeco
Court, City of North York (Don River watershed), be approved, subject to:
(a) The applicant-builder complying with the plans and profiles as
indicated on Drawing *L-l, Job File '5150-1, as prepared by
Project Planning Associates Limited and dated 10.07.l979~
(b) All surplus fill being removed from the site~
(c) Appropriate landscaping material being placed along the valley
side slopes abutting the parking area;
(d) Applicant complying with all existing municipal by-laws and
regulations. CARRIED;
l5. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. Dan O'Reilly
To relocate drainage ditch on Part Lot 1, Concession IV
(Albion), Town of Caledon (Humber River Watershed)
A staff communication was presented advising that an application has been
received from Mr. Dan O'Reilly for permission to relocate a drainage ditch
from the centre to the perimeter of his property at the above location.
Res. #302 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of Mr.
Dan O'Reilly, be received; and
THAT the application of Mr. Dan O'Reilly for the relocation of the drainage
ditch on Part of Lot 1, Concession IV, Town of Caledon (The Regional
Municipality of Peel), Humber River watershed, be approved, subject to:
(a) The ditch being wide enough to carry the maximum flows the
north end culvert can allow; ,
(b) The slopes of the ditch not being steeper than 2.5 to 1;
(c) The di tch being sodded ~
(d) Some rip rap being placed at both culvert locations and at
the south-west cprner of the property where the ditch is
redirected in an easterly direction;
(e) The proposed fill being graded to direct overland flow into
the ditch;
(f) The proposed alignment of the drainage ditch conforming to
the attached plan, which forms part of the permit.
CARRIED;
B-231 -8-
16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Vaughan
To divert New Westminster Creek, a tributary of the West
Don River, at a point approximately 1,000 metres north
of Highway #7, Town of VaugQan
A staff communication was presented advising that an application has been
received from the Town of Vaughan for permission to divert a tributary of the
West Don River at the above location.
Res. 1303 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff communication, together with the application of the
Town of Vaughan, be receivedJ and
THAT the application of the Town of Vaughan for a permit to divert the New
Westminster Creek, a tributary of the West Don River, in an area
approximately 1,000 metres north of Highway #7, Town of Vaughan (The
Regional Municipality of York), Don River watershed, be approved, subject to:
(a) Final approval of the detail design by the Authority staff,
(b) Every effort being made to avoid silt;ng of the creek during
construction.
CARRIED,
17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l,
Humber River Watershed Component
-Property: The Municipality of Metropolitan Toronto
Res. #304 Moved by: Mrs. L. Hancey
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Report (July 17, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase. CARRIED,
"Re: project: Interim Water and Related Land Management projec~
1979-198: Flood Plain and valley Land Acquisition
Component - Humber River Watershed
Authority: Executive Resolution No.133, Meeting No.4 - April
12, 1978 and Authority Resolution No.Sl, Meeting
No.3 - April 21, 1978
Subject Property: North-west corner of Irwin and Albion Roads
OWner: The Municipality of Metropolitan Toronto
Area to be Acquired: 0.247 acres, more or less
Recommended Nominal consideration of $2.00 plus legal costs.
Purchase Price:
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being Part of Lot 1, Plan M-590, Borough of Etobicoke,
The Municipality of Metropolitan Toronto, located on the north-west co~ner of
Irwin and Albion Roads in the Thistletown area.
"Negotiations have been conducted with officials of The Municipality of
Metropolitan Toronto and, subject to the approval of your Committee, agree-
ment has been reached with respect to a purchase price, as follo~s:
The purchase price is to be the sum of $2.00, plus legal costs.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental tp the closing, for land transfer tax, legal costs and
disbu~sements are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance. .
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Minister of Natural Resources for an
Inspectio~ Certificate."
-9- 8-232
18. ONTARIO HYDRO
-Request for Permanent Easement,
Borough of East York
A staff communication was presented advising that a request has been received
from Ontario Hydro for a permanent easement required for construction of "a
proposed 230KV power line across Authority-owned land on the west side of the
Don Valley Parkway, south of Millwood Road.
.
Res. '305 Moved by: J.S. Scott
Seconded by: Mrs. F. Gell
RESOLVED THAT: A permanent easement be granted to Ontario Hydro, required
for construction of a proposed 230KV power line across Authority-owned land
on the west side of the Don Valley Parkway, south of Millwood Road. Said
easement is as shown on Drawing No. TD28999Z, dated June 16, 1978, prepared
by Ontario Hydro, and consists of approximately 0.46 acres, being Part of Lot
ll, Concession III, F.T.B., Part of Lot 15, Concession II, F.T.B., and Part
Qf the Road Allowance between Concessions II and III, F.T.B., Borough of East
York, The Municipality of Metropolitan Toronto. The compensation for the
said easement is to be at the rate of 75 percent of $3,000.00 per acre for
the area affected, plus survey and legal costs; and
THAT the appropriate Authority officials be authorized and directed to sign
the necessary documents to give effect thereto.
CARRIED;
19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
-Erosion Control & Slope Stabilization in The Regional
Municipality of York:
Proposed Remedial Work - Pine Valley Drive, Town of
Vaughan (Humber River Watershed)
A staff communication was presented advising that, as outlined in the staff
report entitled "Erosion Control and Bank Stabilization in the Regions of
Peel, York and Durham", which was approved by the Executive Committee at
Meeting #15/78, remedial work is proposed at the rear of #8254 Pine Valley
Drive and vicinity in the Town of Vaughan.
Res. '306 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: Erosion control work be carried out at the rear of .8254
Pine Valley Drive and vicinity in the Town of Vaughan (Humber River watershed)
at an estimated cost of $12,300.00; and
THAT the approval of the Ministry of Natural Resources be requested;
AND FURTHER THAT the benefiting property owner be required to pay an amount
of $l,200.00.
CARRIED,
20. WAIVER OF RIPARIAN RIGHTS: NEW WESTMINSTER CREEK
(DON RIVER WATERSHED)
A staff communication was presented advising that, as part of the approval
for the diversion of the New Westminster Creek (Item 116 of these Minutes
refers), the Ministry of Natural Resources requires that all riparian owners
affected by the diversion must give written permission that they are willing
to waive their riparian rights.
Since The Metropolitan Toronto and Region Conservation Authority is a land-
owner on the New Westminster Creek below the proposed diversion, it has' been
requested to waive its riparian rights.
Res. '307 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Me~ropolitan Toronto and Region Conservation Authority
notify the Ministry of Natural Resources, in writing, that the Authority is
prepared to waive its riparian rights on the New Westminster Creek.
CARRIED,
B-233 -10-
NEW BUSINESS
21. THE CONSUMERS' GAS COMPANY
-Re9uest for Permanent Easement
A staff communication was presented advising that a request has been received
from The Consumers' Gas Company to provide a permament easement for.a 4~ gas
pipeline, located on the south side of Fisherville Road in the Steeles
Avenue/Dufferin Street area, City of North York.
Res. *308 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: A permanent easement be granted to The Consumers' Gas Company
for a 4" gas pipeline located on the south side of Fisherville Road in the
Steeles Avenue/Dufferin Street area. Said easement affects .011 acres of
Authority-owned land, known as Part of Virginia Street, Registered Plan 2570,
City of North York (The Municipality of Metropolitan Toronto) . Said easement
to be granted for the nominal sum of $200.00, subject to The Consumers' Gas
Company being responsible for carrying out and pay~ng all legal, survey and
other costs involved in the transaction; and
THAT the appropriate Authority officials be authorized and directed to sign
the necessary documents to give effect thereto.
CARRIED,
22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Cusco Fabrication Limited
To enclose a section of existing channel carrying a
tributary of the Don River, just east of Yonge Street,
south of Elgin Mills Sideroad, Town of Richmond Hill
A staff communication was presented advising that an application has been
received from Cusco Fabrication Limited for permission to enclose a section
of an existing channel, which is a tributary of the Don River, at the above
location.
Res. *309 Moved by: Dr. T.H. Leith
Seconded by: MrS. L. Hancey
RESOLVED THAT: The staff communication, together with the application'of
Cusco Fabrication Limited, be received, and
THAT the application of Cusco Fabrication Limited for a permit to enclose a
section of an existing channel which carries a tributary of the Don River,
in the area just east of Yonge Street, south of the Elgin Mills Sideroad, in
the Town of Richnlond Hill (The Regional Municipality of York), Don River
watershed, be approved, subj ect to:
(a) The rip rap located at the outlet of the culvert being extended
to 30 feet from the outlet,
(b) The rip rap works being preceded by a filter mat or a 6"-12"
layer of crushed stone,
(c) The Town of Richmond Hill engineers being satisfied with the
proposal,
(d) Every effort being made to minimize the silting of the creek
duri~g construction;
(e) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED,
23. AQUAPRO DIVING COURSE
-Attendance at
A staff communication was presented advising that the Waterfront Monitoring
Program involves a considerable amount of underwater investigation to deter-
mine the suitability for fish spawning and habitat, also, monitoring of the
landfilling process frequently involves examination of ~e slope of the land-
fill to assess stability.
Mr. Alan Hayton, Project Biologist with 'the Water ResoUrce Division, is a
certified diver who presently undertakes many of th'ese investigations, with
-ll- B-234
the assistance of a consultant or other professional diver.
.Mr. Ken Snowden, Biological Technician with the Water Resource Division, has
recently registered in the Aquapro Diving Course.
Res. #310 Moved by: Mrs. L. Hancey
Seconded by: M.J. Breen
RESOLVED THAT: Mr. Ken Snowden, Biological Technician, Water Resource
Division, be reimbursed in the amount of $100.00, this being the total cost
of the Aquapro Diving Course in which he is presently registered.
CARRIED,
24. AUTHORITY REQUESTED MOVING EXPENSES
-Miss Jean Wansbrough
A staff communication was presented advising that the following quotations
have been received for the removal of the personal belongings of Miss Jean
Wansbrough from Markham to Pal grave and various office equipment .and files
from the Claremont Conservation Field Centre to the Albion Hills
Conservation Field Centre:
Company Estimated Cost
Aero Mayflower Transit Company Ltd. $2,Ol5.05
Thomson Moving and Storage 2,515.30
Rockbrune Brothers Limi ted 4,379.10
Res. #3ll Moved by: Mrs. S. Martin
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The quotation received from Aero Mayflower Transit Company
Limited for the removal of Miss Jean Wansbrough's personal belongings from
Markham to Palgrave, and various office equipment and files from the
Claremont Conservation Field Centre to the Albion Hills Conservation Field
Cen tre, in the amount of $2,Ol5.05, be accepted, it being the lowest
estimate received.
CARRIED;
25. EXECUTIVE COMMITTEE - SPECIAL MEETING
Res. #312 Moved by: M.W.H. Biggar
Seconded by: J.S. Scott
RESOLVED THAT: A Special Meeting of the Executive Committee be held to
discuss the procedures with respect to Hearings under Ontario Regulation
735/73 and to review technical data available to the Committee to assist
them in making decisions regarding applications under the Regulation.
26. AUTHORITY MEETING #5/79 CARRIED;
-October 12, 1979
It was suggested that consideration be given to holding the next meeting of
the Authority.at The Regional Municipality of Peel on Friday, October 12,
1979.
27. ADJOURNMENT
On Motion, the Meeting adjourned at 2:45 p.m.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
II'IK
Mil(
N:
I
lQfil 1 9 7 9 BUD GET REV I S ION S PAGE: 13
~
~
0
fil
::r:: PROGRAM: OPERATIONS & MAINTENANCE - COMMUNITY RELATIONS - INFORMATION , EDUCATION DATE: July 17, 1979
u
II) U~t;HA'l' .1 Ul'l 5
PURPOSE: To provide an outdoor and conservation education program for school students and other community groups
at four Conservation Field Centres and a variety of outdoor and conservation education opportunities for
the general public and school groups at the Kortright Centre for Conservation and at the Black Creek
Pioneer Village.
1979 OBJECTIVES: - a continuation of the program at the same level of service as in 1978 for existing facilities;
- the opening of the Kortright Centre Building for public use; .
- to provide an outdoor and conservation education program for the following estimated number of studentl
and adults:
- Black Creek Pioneer Village 64,000
- Conservation Field Centres 15,500
- Albion Hills Conservation Farm 9,000
- Maple Syrup Days 31,000
- Special Days, Field Trips, Claireville Dam Tours,
etc. 12,000
- Kortright Centre for Conservation 50,000
FUNDING: Program revenues and the General Levy on all participating municipalities. A surplus or deficit on the
operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited to the
participating boards of education. A grant of $33,113.00 from the Provincial Ministry of Culture and
Recreation will be received for the operation of the Kortright Centre for Conservation and The Metropo-
litan Toronto and Region Conservation Foundation Kortright Centre Growth Endowment Fund will p~ovide
another $5,000. .
/mrp
1979.07.18
191'9 BUD GET REV I S ION S PAGE: ~
PROGRAM: OPERATIONS & MAINTENANCE - COMMUNITY RELATIONS - INFORMATION & EDUCATION DATE: July 17, 1979
OPERATIONS
o RIG I N A L BUDGET REVISED BUDGET
Sources of Financing Sources of Financing
Net Provincial Municipal Net Provincial l-Iunicipal
ACTIVITY Expenditures Grant .Levy Other Expenditures Grant Levy Other
Albion Hills C.F.C. - - - - - - - -
Boyd C.F.C. - - - - - - - -
Claremont C.F.C. - - - - - - - -
Cold Creek C.F~C. - - - - ~ .:: - -
Lake St. George C.F.C. - - - - - - - -
.
General Interpretive Program - - - - - - - -
B.C.P.V. Pioneer Life Program - - - - - - - -
B.C.P.V. TOur Program - - - - - - - -
Kortright 55,000 18,000 32,000 5,000 70,113 33,113 32,000 5,000
\D
f'I)
N
I
lEa
B-237
SCHEDULE "B"
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
MEETING 1110/79
RE: HISTORICAL SITES DIVISION STAFF PROGRESS REPORT
APRIL 1 TO JUNE 30, 1979
1) PROGRAM
(a) Registration and Artifacts
Black Creek received 33 donations comprising 204 items. These include a
large donation of 90 artifacts, consisting of lamps, furniture and rugs
from Dr. R. Birrell. Another donation contained 54 early twentieth
century toys. Other recent acquisitions include 4 early pocket watches
and from the Craig Wakely Estate in Bolton a large bob sled once used on
the High Park run.
Since the end of May the Registration Department has had the assis~ance
of a cataloguing team of three students through the Experience '79 Pro-
gram 0705 from the Ministry of Culture and Recreation. With the team's
assistance, all recent acquistions, as well as approximately 500 pieces
of the Miss E. McNair glassware donation, have been catalogued.
Work is progressing on storage relocation and the Mackenzie Home basement
has been refitted and prepared to house the textile collection. Some
furniture from the collection is being restored by the Village cabinet-
maker in preparation for the Sawyer's House.
A fine 1789 Bible was restored by the bookbinder in the village. The
horse tread mill and the stump puller have been completely restored and
made operable.
(b) Publicity and Promotion
Black Creek has assisted Gibson House, Sibbald Point Provincial Park,
Forwarder's Museum of Prescott, and Toronto Historical Board with artifacts
for displays. Also, a large collection of Victoriana was loaned to the
Sheraton Centre in Toronto for an exhibit.
Several agencies used Black Creek as a location for commercial photography.
The Media Centre at university of Toronto filmed part of a Canadian
History documentary, "The Last Buffalo Hunter" in the Broommaker's Shop.
Conestoga College used the Gunsmith Shop and the Village gunsmith in a
film on metal crafts to be used for the promotion of a new course in this
field. Woolworth's took photographs to be used in a "back-to-school"
flyer for later this summer. Also, the Village has been used by several
photography students for school projects.
Local newspapers and magazines have continued to be supportive of Black
Creek and numerous photographs and articles have been published through
the spring on village activities.
Village staff have been called on to talk to 'various groups, about village
activities and nineteenth century Ontario life. Lectures have been pre-
sented to the Thornhill Lionettes, the Society for the Preservation of
Historic Thornhill, the University Women's Group of Weston, and a group
at the Church of the Good Shepherd. Two staff members instructed at a
one-day Ontario Museum Association Seminar on "Interpreting the Historic
Site".
C.F.T.O. "Canada Today" featured the village as part of their Victoria Day.
show with film footage shot at Black Creek and a staff person interview
with Pat Murray. On his C.F.R.B. program, John Bradshaw did four village
interviews. One of these was with the clockmaker, which resulted in a
substantial increase of business for him.
(c) Special Events
20 weddings were held at the Village, and there have been 25 receptions
and banquets at Half Way House.
B-238
HISTORICAL SITES DIVISION STAFF PROGRESS REPORT
APRIL 1 TO JUNE 30, .1979
Page 2
Another successful Rogationtide Service was held on June 3rd. Once again
Bishop Read, Suffragan Bishop of Toronto, led the service.
.
A visit to Black Creek was included on the itinerary of several notable
groups, including delegates to the Wedgewood Seminar held in Toronto, the
Ontario Heritage Foundation, the National Historic Sites Board and a group
of students from the Graduate Program in Museum Studies, New York State
College, Cooperstown.
(d) Building Maintenance and Construction
Work is progressing well on the renovation of the upper floor of the
Administration Building and, with the assistance of Mimico workefs,
improved lighting has been installed throughout.
A new ventilator system has been installed in the Haif"Way House kitchen.
The skate shack in the lower parking lot has been moved and will be used
for lumber storage. Two school portables have been moved in to replace
the skate shack and will be refurbished to be used as shelter for school
groups.
(e) Ground Maintenance and Development
A new picket fence has been constructed in front of the Weaver's Shop.
New rail fencing has been installed to protect the slopes behind Fisher-
ville Church and the wagon turn has been relocated to the end of the
boardwalk below the Church.
Village staff have assumed responsibility for grounds maintenance at Head
Office.
(f) Livestock
30 lambs were born this spring, bringing the number of sheep to over 50.
All the mature sheep have been shorn and extra fleeces will be made avail-
able for sale.
A filly was born on the May 24th week-end and therefore named 'victoria'.
Four young Tamworth sows have been purchased.
(g) lli!!
Two staff members were asked to act as resource people at a training
seminar on cataloguing and research given by the Ministry of Culture and
Recreation for their Experience '79 students.
One staff member attended the Canadian Museum Association annual conference
in British Columbia. Expenses were paid by the ~ntario Museum Association
and the staff member involved.
Two staff members attended a one-day seminar on Costume Cataloguing given
by the Costume Society of Ontario in London.
2) FINANCIAL STATEMENT -J~ 1 to June 30, 1979
Total Budget Used
Operations Appropriation Budget Variance ,
Expenditures $ 422,083 $ 889,000 $ 466,917 47
Revenue $ 304,495 $ 822,000 $ 517,505 37.04
Development
Expenditures $ 2,652 $ 70,917 $ 68,265 3
B-239
HISTORICAL SITES DIVISION STAFF PROGRESS REPORT
APRIL 1 TO JUNE 30. 1979
Page.3
3) FINANCIAL COMM~NTS
(a) Operations & Maintenance
Black Creek Pioneer village
Total attendance to June 30, 1979, is 96,974, down from 106,705 at the
same time in 1978, due mainly to weather conditions on week-ends. As a
result, gate revenue is down by $10,825.45 from 1978. Sales outlets,
however, '.have shown an increase of $8,548.45 over last year.
Village citizenships increased during the second quarter of 1979 from l82
to 371 members.
The Dickson's Hill School Program was again fully booked, with 10 classes
attending during the spring session.
The government-sponsored Experience '79 Program has enabled the Village
to hire 19 students to assist in interpretation, office work, mainten-
ance, livestock, costume department and gift shop. Also, the Ministry of
Culture and Recreation Experience Program 0705 has provided 2 researchers
and 3 cataloguers for the summer.
The Southern Ontario Unit of the Herb Society of America and the Dunning-
ton Grubb Foundation have sponsored a gardener for the summer to work on
the Doctor's House garden and the Herb Garden.
(b) Historical Sites Development
Capital development will be limited to three major restorations this year -
the Taylor Cooperage, the Richmond Hill Manse and the Sawyer's Home. Funds
have been made available through the Metropolitan Toronto and Region Con-
servation Foundation, Wintario and the Junior League of Toronto to com-
plete the restoration of the Cooperage and the Sawyer's Home. It is hoped
that funds will be available in 1980 to complete the Richmond Hill Manse.
$lO,OOO has been added to the Development budget to move and refurbish
two portable classrooms.
TO: The Chairman and Members of the Executive Committee, M.T.R.C,A. B-~40
Meeting '10/79 ~ Wednesday, July 25, 1979
FR: Alan D. Harris, Administrator, Finance Division
RE: STAFF PROGRESS REPORT '2/79 - JANUARY I, 1979 TO JUNE 30, 1979 - FINANCE DIVISION
Total To !Ii of Forecast to
ADMINISTRATION Budget June 30/79 Budget Dec. 31/79
$ $ $
Revenues 70,000 30,550 44 70,000
-
-
Expenditures
Salaries 560,150 279,902 49 560,150
Employee Benefits 440,500 214,152 48 440,500
Travel Expenses 97,500 41,703 42 97,500
Vehicles & Equipment 36,000 18,741 52 35,000
Materials & Supplies 81,500 46,388 57 82,500
Rent & Utilities 77,250 35,922 46 77,250
General Expenses 54,100 11,096 21 54,100
-
1,347,000 647,904 48 1,347,000
-
-
Expenditures are on budget for the following activit.ies.:- salaries, employee benefit and
travel expenses.
Vehicles & Equipment
Office Equipment 6,000 6,368 106 6,500
Leased Vehicles 30,000 12,373 41 28,500
-
36,000 18,741 52 35,000
-
-
a) Office Equipment expenditures are estimated to be overspent by $500.00 due to the higher
cost of replacement.
b) Leased Vehicles are estimated to be underspent as lower than anticipated maintenance
costs are being incurred.
Materials & Supplies
Uniforms and Equipment 7,500 11,213 149 8,000
Postage 16,000 8,841 55 16,500
Stationery and Office Supplies 50,000 17,926 36 49,500
Office Equipment Maintenance 8,000 8,408 105 8,500
-
81,500 46,388 57 82,500
-
-
a) Uniforms and Equipment expenditures represent purchases for inventory and are reduced as
recoveries are made from sales to employees. An overexpenditure of $500 is estimated.
b) Postage expenditures are expected to be ~verspent by ~500.
c) Stationery and Office Supplies are expected to be under spent by $500.
d) Office Equipment expenditures include payment for service contracts for office equipment
for the year. It is estimated that this account will be overspent by $500. as a result
of the higher costs of service contracts.
Rent & Utility Services: Expenditures are on budget for this activity based on projected
expenditures for the balance of the year.
General Expenses: The low level of expenditures to date in this activity has been anticipated
as most .payment (insurance, audit fees etc...) are made in lump sums.
B- 241
Executive Committee Meeting '10/79
Staff Progress Report #3/79 - January 1 - June 30, 1979 - FINANCE DIVISION
Total To .\ of Forecast to
GENERAL OPERATIONS Budget June 30/79 Budget Dec. 31/79
$ $ $
Revenues
.
Rental Properties etc... 16,500 22,355 135 27 ,000
Interest (Net) - (22,989) - 12 , 000
-
16,500 (634) 4 39,000
-
-
Expenditures
Office Cleaning 19,000 7,143 37 19,000
Office Maintenance 32,000 20,373 63 35,000
Oth~r Expenditures 61,000 4,734 8 61,000
-
112,000 32,250 29 115.000
-
-
Revenues: It is anticipated that the unfavourable interest income will be reversed by
December 31, 1979 and a net interest income of $12,000 will be attained.
Expenditures: Office Maintenance expenditures will be overspent by $3.000 due to higher
costs of maintenance. This overexpenditure will be financed from general revenues.
Other expendit~res are on target. Ins~rance payments are paid in a lump sum and will be
paid shortly. Head Office Renovations will also be made later in the year. Vehicles and
E~uipment Suspense. Budget will be expended at the end of the year as vehicles and equip-
ment are replaced.
1979.07.12.
B-242
STAFF PROGRESS REPORT
Property Division
During the period April 1, 1979, to June 30, 1979, the Property
Division completed the acquisition of 9 new properties containing
168.796 acres. The total acreaqe of lands owned by the Authority,
as of June 30, 1979, is 26,534.905 acres.
The Property Division also carried out all of the routine admini-
stration management required in connection with Authority owned lands,
i.e. agreement, easements, taxes, leases, rentals, insurance, etc.
A breakdown of the properties and acreages acquired by the Authority
to date is as follows:
FLOOD CONTROL AND WATER CONSERVATION
ETOBICOKE CREEK WATERSHED
2 - Properties settled during period containing 58.383 acres
- 1 property expropriated during period containing 53.363 acres
- 1 purchase and 1 expropriation
Total to date--62 properties acquired containing 407.774 acresJ
- 2 expropriations outstanding
MIMICO CREEK WATERSHED
Total to date--23 properties acquired containing 75.475 acreSJ
HUMBER RIVER WATERSHED
2 - Properties settled during period containing ~0~.~44acres
- 2 purchases
Total to date--725 properties acquired containing 8,358.177 acresJ
- 1 expropriation outstanding
DON RIVER WATERSHED
3 - Properties settled during period containing 7.782 acres
- 3 purchases
Total to date--157 properties acquired containing 1,786.04l acreSJ
- 3 expropriations outstanding
HIGHLAND CREEK WATERSHED
Total to date--139 properties acquired containing 821.229 acreSJ
ROUGE RIVER VALLEY WATERSHED
Total to date--109 properti~s acquired containing 2,073.686 acresJ
DUFFIN'S CREEK WATERSHED
1 - Property settled during period containing 0.207 acres
- 1 purchase
Total to date--77 properties acquired containing 885.869 acresJ
CONSERVATION AREAS:
- Albion Hills Conservation Area
Total in Area--34 properties containing 1,044.142 acres;
B-243
- 2 -
- alack Creek Conservation Area
Total in Area--7 properti~s containing 113.966 acres;
- Bolton Community Conservation Area
Total in Area--4 properties containing 18.043 acresJ
- Boyd Conservation Area
Total in Area--12 properties containing 99l.090 ac~es;
- Bruce's Mill Conservation Area
Total in Area--2 properties containing 267.038 acreSJ
- Cedar Mill Property
Total in Area--l property containing 0.337 acreSJ
- Claireville Conservation Area
Total in Area--l property containing 28.1l4 acres;
- Claremont Conservation Area
Total in Area--5 properties containing 396.750 acresJ
- Cold Creek Conservation Area
Total in Area--6 properties containing 467.880 acres;
- Frenchman's Bay Conservation Area
total in Area--9 properties containing 49.430 acresJ
- Glassco Park
Total in Area--l property containing 482.000 acreSJ
- Glen Haffy Conservation Area
Total in Area--ll properties containing 802.206 acresJ
- Greenwood Conservation Area
Total in Area--14 properties containing 680.648 acreSJ
- Heart Lake Conservation Area
Total in Area--8 properties containing 380.663 acreSJ
- Humber Trai.ls Conservation Area
Total in Area--l property containing 48.664 acres;
- Oakbank Community Pond
Total in Area--l property containing 9.350 acreSJ
- Petticoat Creek Conservation Area
Tota~ in Area--l property containing l77.9l8 acresJ
- Lake St. George Conservation Area
Total in Area--l property containing 319.250 acresJ
B-244
- 3 -
- Tam O'Shanter Conservation Area
Total in Area--l property containing 118.626 acres;
,
FOREST AND WILDLIFE AREAS:
- Gibson Lake Forest and Wildlife Area
Total in Area--l property containing 137.160 acres;
- Glen Major Forest and Wildlife Area
Total in Area--10 properties containing 1,442.057 acres;
- Goodwood Forest and Wildlife Area
Total in Area--6 properties containing 307.639 acres;
- King Creek Forest and Wildlife Area
Total in Area--l property containing 0.185 acres;
- Palgrave Forest and Wildlife Area
Total in Area--7 properties containing 628.432 acres;
- Peter Wright Forest and Wildlife Area
Total in Area--l property containing 20.939 acres;
AGREEMENT FOREST LANDS:
- Uxbridge Forest and Wildlife Area
Total in Area--l property containing 93.000 acres;
- Humber Forest Area
Total in Area--22 properties containing l,803.l65 acres;
NIAGARA ESCARPMENT LANDS:
Total in Area--4 properties containing 25l.926 acres;
WATERFRONT PLAN:
- Project W.F.-l - Etobicoke Sector
Total to date--6 properties acquired containing 68.6l6 acres;
- Project W,F.-2 - Ashbridge's Bay Sector
Total to date--l property acquired containing 29.618 acres;
- Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete)
Total to date--4 properties acquired containing 0.64l acres;
- Project W.F.-3A - Pickering/Ajax Sector (Ext. No.1)
Total to d~te--l49 properties acquired containing 491.0l3 acres;
B-245
- 4 -
- Project W.F.-4 - Scarborough Sector
1 - Property settled during period containing 0.580 acres
- 1 purchase
Total to date--52 properties acquired containing 456.l48 acres
- 1 expropriation outstanding
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION:
April 1 to June 30, 1979 - 8 properties settled containing 168.216
acres;
- (7 purchas~s and 1 expropriation)
- 1 property expropriated
Total to date--l,292 properties acquired containing 14,408.251 acres;
- 6 expropriations outstanding~
CONSERVATION AREAS:
April 1 to June 30, 1979 -
Total to date--120 properties acquired containing 6,396.115 acresJ
FOREST AND WILDLIFE AREAS:
April 1 to June 30, 1979 -
Total to date--26 properties acquired containing 2,536.412 acres;
AGREEMENT FOREST LANDS:
April 1 to June 30, 1979 -
Total to date--23 properties acquired containing 1,896.165 acres;
NIAGARA ESCARPMENT LANDS:
April 1 to June 30, 1979 -
Total to date--4 properties acquired containing 25l.926 acres;
WATERFRONT PLAN:
April 1 to June 30, 1979 - 1 property settled during period containing
0.580 acres
- ( 1 purchase)
Total to date--2l2 properties acquired containing 1,046.036 acreSJ
- 1 expropriation outstanding;
GRAND TOTAL OF ALL PROJECTS
April 1 to June 30, 1979. - 9 properties settled containing 168.796 acreSJ
- (8 purchases and 1 expropriation)
- 1 property expropriated during periodJ
Total to date--l,677 properties acquired containing 26,534.905 acresJ
- 7 expropriations outstanding.
B-246
TO: Executive Committee, M.T.R.C.A. Mtg. #ll/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1979 TO JUNE 30, 1979
FLOOD CONTROL SECTION
1) MAINTENANCE WATER CONTROL STRUCTURES
(a) PROGRESS
Normal day to day maintenance was carried out on all the water control
structures. The study of the Lower Humber weirs and the fencing of the
Brampton Diversion Channel have been started and should be completed early
in July, 1979.
(b) FINANCIAL STATEMENT TO JUNE 30. 1979
Year " of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec/3l/79
$ $ $ $ " $
Mainte- 62,870.46 l2,3l8.00 75,188.46 183,700.00 40 l83,700.00
nance
(c) FINANCIAL COMMENT
The maintenance programme is on target and it is expected to expend this
total budget this year.
2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS
(a) PROGRESS
Flood Warninq and Forecastinq Svstem
The mobile radios ordered for this year have been received and installed.
The acquisition of recording rain gauges is still under study for this
year.
(b) FINANCIAL STATEMENT TO JUNE 30. 1979
Year " of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec/3l/79
$ $ $ $ " $
Telemark 3,670.57 0 3,670.57 8,000.00 45 8,000.00
Gauges
Radio 633.53 l5,765.78 l6,399.3l l5,000.00 l09 l6,399.3l
System
Staff 33,000.47 0 33,000.47 65,800.00 50 65,800.00
Salaries
Staff 473.84 0 473.84 3,700.00 12 3,700.00
Travel .
'37,778.4l l5,765.78 53,544.19 92,500.00 57 93,899.31
../2
B-247
TO: Executive comndttee, M.T.R.C.A. Mtg. #ll/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 2
.
2) (c) FINANCIAL COMMENT
The expenditure under the telemark gauges was due to an unpaid
commitment made in 1978 however, it should not seriously affect the
Authority's plans to acquire recording rain gauges this year. Due to the
increase in the price of mobile radios, a small over-expenditure will
occur under this item. Remainder appears to be on target and it is
expected to expend the total budget this year.
3) INTERIM PROJECT CAPITAL
(a) PROGRESS
The Flood Plain Acquisition Programme continued during this period again
with concentration being made on properties within the Village of
Stouffville and as of the end of June all, but one, properties have been
closed.
The Environmental Monitoring Programme has started and should be
complete by early fall.
The various studies quoted under the Flood Control Plan Review are
under way and has also seen the completion of all the floodline mapping
except the Humber River which is expected this summer.
The Damage Centre Analysis study is still under way and should be
canplete on schedule.
(b) FINANCIAL. STATEMENT TO JUNE 30. 1979
Year ' of Forecast
To Date Total Budqet to
EX%end. Comm\tments AP~rop . Budqet Used Dec/31/79
$ ,
Flood Plain 881,181.83 369,037.00 1,088,036.30 667,273.00 163 1,088,036.30
Acquisition
Headwater 150,762.70 0 150,762.70 200,000.00 75 200,000.00
Acquisition
Environmental 11,419.83 0 11,419.83 100,000.00 11 100.000.00
Monitoring
Flood Control 97,285.22 2,730.10 100,015.32 297,000.00 33 297,000.00
Plan Review
Milne Workshop 9,872.82 0 9,872.82 20,450.00 48 10.000.00
1,150,522.41 371,767.10 1,522,289.51 1,359,723.00 111 1,69~. 036.'00
B-248
TO: Executive Committee, M.T.R.C.A. Mtg. #ll/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL_l, 1979 TO JUNE 30, 1979 Page 3
3) (c) FINANCIAL COMMENT
Due to the necessity of acquiring all of the remaining properties in the
Village of Stouffville this year, the property budget is over-expended.
The change in this budget from $l,339,273.00 to $1,359,723.00 is due to
the increased funding we received from the Federal Government under the
Flood Damage Reduction Programme.
4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS
W.C.-S8 - Don River - Bathurst Street to Finch Avenue
This project has been completed and paid for at this time.
Erosion Control and Slope Stabilization in Metro:
ITEM LOCATION WATERSHED STATUS
Major Remedial Work 6-l4 Sulkara Court Don River Completed
Revegetation
in the fall
19-45 Riverview Heights Humber River Completed
50-58 Stanwood Crescent Humber River In progress
Enfield/Sunset/Jellicoe Etobicoke In progress
Ave. Creek
Minor Remedial Work Beechgrove Rd. - Phase II Highland Completed
Creek
34 Restwell Crescent Don River Completed
Revegetation
in the fall
.
Together with the foregoing, Spring revegetation was carried out at
8 sites and maintenance work was carried out at 4 sites.
Erosion Control and Slope Stabilization in Peel. York and Durham:
I REGION LOCATION WATERSHED STATUS
York 14th Avenue Rouge River Completed
Lots 5 & 6, Conc.8
York 19th Avenue Rouge River Completed
Lot 30, Conc. 8
Peel l38 King Street Humber River In progress
Vicinity, Bolton
../4
B-249
TO : Executive Committee, M.T.R.C.A. Mtg. #ll/79
FROM:' Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 4
4) (a) PROGRESS
Reconstruction of Hiqhland Creek
1979 was the third year of the three-year programme for remedial work
within the Highland Creek. Work has been completed at the following
sites. It is expected that all of the sites damaged by the sto~s in
1976 and 1977 will be repaired as contemplated under this project by
the end of 1979.
LOCATION STATUS
Morningside Parks Yard Completed
Scarborough College - Tennis Courts Completed
South of Kingston Road Bridge Completed
Enqineerinq Studies:
Stouffville Channel
Detailed engineering has been completed and this contract has been
tendered and it is expected to commence construction early in
August, 1979.
Wilket Creek Enqineerinq Study
This study is expected to commence later this year once the canpleted
Hydrologic Model study and floodline study have been received.
Oak Ridqes Study
Draft report of this study. has been received and it is exPected to
finalize it early this summer.
../s
B-250
TO: Executive Committee, M.T.R.C.A. Mtg. #11/79
~ROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
,FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 5
4) (b) FINANCIAL STATEMENT TO .JUNE 30. 1979
Year " of Forecast
To Date Total Budget to
EXDend. Commitments ADDrOD. Budqet Used Dec/3l/79
$ $ $ $ " $
W.C.-58 99,690.00 0 99,690.00 99,690.00 lOO 99,690.00
Erosion 18l,738.9l 6,634.00
Control l88,372.9l 800,000..00 23 800,000.00
Metro
Erosion 16,993.39
Control 0 16,993.39 200,000.00 8 200,000.00
Peel,York
& Durham
Highland l57,62l.60 0 l57,62l.60 240,000.00 65 240,000.00
Creek
Restoration
Stouffville 19,963.76 0 19,963.76 395,000.00 5 395,000.00
Channel
Wilket 0 0 0 lO,OOO.OO 0 lO,OOO.OO
Creek
Oak Ridges 240.69 0 240.69 5,000.00 ,4 8,000.00
476,248.35 6,634.00 482,882.35 1,749,690.00 28 l,744,690.00
(c) FINANCIAL .COMMENT
This budget is on target and it is expected to expend the total this year.
1979.07.l6
JCM/fn
B-251
'1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, .M.T.R.C.A.
-Meeting #11/79
FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1979 to JUNE 30, 1979
Page 6
WATERFRONT SECTION
The Authority received word from the Province early in 1979 that the
Supplementary Waterfront Project had not been approved. The funds which
were requested in the Supplementary Project were intended to allow the
Authority to proceed with the shoreline management program, some additional
development of the Western Beaches and to start the Colonel Samuel Bois
Smith waterfront project. As a result of the province's. decision, these
projects will again be deferred. The Municipality of Metropolitan Toronto
has however, agreed to carry the Municipality's portion of the Supplementary
Project in their forecast made again this year for funding in 1980.
The Authority is particularly concerned with additional funds to be allocated
for shoreline management and therefore, requested the support of the member
municipalities in seeking supplementary funding from the Ministry of Natural
Resources. Strong support has been received from Metro Toronto, the City of
Toronto, scarborough and Etobicoke. It is now anticipated that a meeting
will be held with the Minister, Mr. Auld to discuss this matter.in detail in
the near future.
COLONEL SAMUEL BOIS SMITH
-The Master Plan for the site has been submitted to the Ministry of the
Environment for approval under the Environmental Assessment Act, but to
date no formal response has been received. It is still not certain if an
Environmental Assessment hearing will be required.
HUMBER BAY WEST
-The total area created as part of the Humber Bay West project is now 64 acres.
-The Master Plan shape has been achieved.
-The Authority staff and rented equipment have now completed most of the rough
grading of the site and the base for the access road has now been placed on
the final alignment and base material has been installed in the parking lot
and the boat storage area for the Humber Bay Boating Federation.
-The Humber Bay' Boating Federation is having a very successful season.
Approximately 460 boats are now moored at the site and the waiting list is
growing rapidly. It is anticipated that the Federation will easily reach
the design capacity of Humber Bay by next season and should be able to
undertake the construction of some of the assoc~ated land based facilities.
-One of the major components of the 1980 Waterfront Development program will
be the armouring and servicing of the Humber Bay site. Design work will
begin in the near future.
HUMBER BAY EAST
-A contract was awarded to M.A. Butt in the amount of $780,722.70 at Executive
Committee meeting #8/79 on June 13, 1979 for the construction of the park
buildings, foot bridges and other site development features. Construction
will be underway by July 20th.
-The landscaping plans have also been prepared, but funds will not permit this
work to be completed in 1979. Final landscaping will be undertaken by the
Conservation Land Management Division in the spring of 1980. The A.uthority
staff is presently involved in the maintenance of existing p~ant material
and grassed area.
B-252
TOl THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
-Meeting #11/79
FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
REI WATER RESOURCE DIVISION PROGRESS REPORT
FROM APRIL 1, 1979 to JUNE 30, 1979
Page 7
-An Authority crew will be on the site in the near future to begin work on the
liner of the pond system.
WESTERN BEACHES
-The Authority's involvement in this area is virtually complete pending a
decision on additional funding for the waterfront.
-The Sunnyside Pavilion is continuing to deteriorate and since the Authority
is unable to undertake the restoration of the building, the City of Toronto
Parks Department has carried out some temporary work to protect users of
the area.
BLUFFERS, PHASE II
-Fill volumes continue to be considerably lower than normal, but progress is
being made towards the completion of the breakwater. Filling is presently
concentrated on Point #9 to prepare for final armouring.
-Federal funding of the project under the Small Craft Harbours Assistance
Program is being continued to include the armouring of Points 8 and 9.
Preparations are currently underway to award a contract for the armouring of
Point 9 in the amount of approximately $280,000. Upon completion of this
phase of the project, the total Federal expenditures will have reached
$1,653,000.
-The Bluffers Boating Federation has successfully installed approximately
110 mooring slips during the spring. Many of the docks were pre-fabricated
by Pede ration members during the winter months and the piles driven and docks
installed by Federation members during April, May and June. If the Authority
is able to advance the landfilling suffiCiently by next spring, the Federation
should have no difficulty in doubling the eXisting capacity for the 1980
season.
-The construction of the launching ramps and day mooring docks is substantially
complete with only minor details outstanding. The ramps have been used by
the public for several weeks. The construction of the permanent parking lot
assoc~ated with the day mooring docks, as well as the extension of the parking
area associated with Phase I is underway and should be completed early in
August.
EAST POINT
-Discussions are ongoing with the Authority's consul~ant, Hough Stansbury a~d
Associates in an effort to finalize the Master Plan 'review and to prepare site
plans in preparation for the construction to begin at this site upon completion
of Bluffers Park.
-The Easterly Filtration Plant, presently under construction by Metro Toronto,
is nearing completion and Authority staff is working closely with representa-
tives of Metro Works Dept. to take the maximum advantage of the construction
activities ongoing in the area. Considerable volumes of fill and top soil
which were surplus from the Metro Works site are available to the Authority
for use in the construction of East Point Park. Since the East Point lands
were used for storage of fill, materials, etc. during the construction of
the Water Plant, the contractors are required to carry out certain works on
Authority lands which will assist in the development of the park at no cost.
B-253
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A.
-Meeting 1111/79
FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT
,FROM APRIL 1, 1979 to JUNE 30, 1979
Page 8
ENVIRONMENTAL MONITORING
-The collection of field data on water quality, sediment quality, benthos
and fish populations is well underway and extensive examination of bottom
conditions in the area of East Point Park (by scuba diving) has been carried
out by Authority staff and consultants. The work is being done as part of
the Master Plan review.
-The Ministries of the Environment and Natural Resources. continue to raise
concerns about the landfilling process. A technical comittee has been
recently established with representatives of the two Ministries and the
Authority to review the impact of landfilling. Data collected in previous
waterfront monitoring programs is extremely valuable in this process.
SHORELINE MANAGEMENT
-Preparation of a detailed Master Plan in the Scarborough sector is ongoing.
The Authority is awaiting Provincial approval to retain a consultant to
examine certain soil mechanics and slope stability questions along the
Scarborough Bluffs, aimed at producing recommendations on appropriate
construction techniques to stabilize the Bluff face after the toe of the
Bluffs has been protected.
-Construction of an offshore revetment is presently underway at Crescentwood
Park. The work is being done to protect the toe of the fill material .
placed by the Borough of Scarborough last fall to save portions of
Crescentwood Road and underground services which were threatened. The work
is being carried out by rented machines under the supervision of Authority
staff.
-The contract drawings for protective work along the Eastern Beaches in the
City of Toronto have been completed. Unfortunately, the decision by the
Province not to approve the Supplementary Project has resulted in insuffi-
cient funding to undertake these works in 1979.
~
In
N
'I
IQ
FINANCIAL STATEMENT TO JUNE 30, 1979
Year to Date Commitments Total Approp. Budqet , of Budqet Used
Expenditures
Colonel Samuel Bois 3,029.77 - 3,029.77 50,000 6
Smith Park
Humber Bay West 92,8l7.8!i - 92,817.88 160,000 58
Humber Bay Ea'st 8,050.09 780,722.70 788,772.79 950,000 83
Western Beaches - - - 5,000 -
Ashbridqe's Bay 3,664.21 - 3,664. 21 5,000 73
Bluffers Park 86,276.28 371,188.00 457,464.28 740,000 61
East Point 6,142.28 - 6,142.28 20,000 30
Petticoat Creek 3,890.61 1,279.64 5,140.55 20,000 25
Studies/Monitorinq 37,057.64 257.40 37,315.04 110,000 33
Shoreline Manaqement 7,523.20 430.92 7,954.12 500,000 1
Land Acquisition 318,241.19 1,525.00 319,766.19 240,000 133
PROGRAM TOTAL 566,663.45 1,155,403.66 1,7.22,067.11 2,80Q,000 61
The Waterfront Development Budget is qenera1ly on-tarqet, now that several major contracts have been awarded and
commitments have been identified. The recent announcement of additional Federal fundinq ensures that no severe
cuts will be required from other parts of the proqram to, cover the costs of armourinq at Bluffers Park. However,
the over expenditure in the land acquisition component of the proqram, associated with the Sunny Point expropriation
settJ:ement, will require a budqet amendment. Althouqh the expenditures for shoreline manaqement appear low, work is
underway on several projects.
B-255
TO: The Chairman and Members of the Executive Committee, M.T.R.C.A.
Meeting #11/79
RE: INFORMATION & EDUCATION DIVISION PROGRESS REPORT -
January 1 - June 30, 1979
(a) INFORMATION
The Authority's information work is carried out under the Community
and Staff Relations Program, which is comprised of four components,
namely Administration, Conservation and Recreation Land Management
Plan, Water and Related Land Manageme~t Plan, and The Metropolitan
Toronto and Region Conservation Foundation.
Highlights Included:
_ the production of 230,000 pieces of literature including:
_ 200,000 copies of the four-colour general brochure;
_ lO,OOO copies of the 1919 Calendar of Events and Activities;
_ 2,000 copies of the 1977-78 Biennial Report;
_ 1,000 copies of th~ Meeting Facilities Brochure for the
Kortright Centre for Conservation;
- 500 copies of the 1979 Directory:
_ 5,000 copies of the four-colour brochure for The Metropolitan
Toronto and Region Conservation Foundation;
_ 225 copies of the sixty-six-page catalogue for Foundation
fund-raising:
- 10,000.~tick-on name tags:
_ preliminary work on the four-colour Black Creek Pioneer
Village brochure (distribution to begin on July 16)
_ the completion of five special printing project~ (26,200) for the
Albion Hills ~onservation Field Centre, the Kortright Centre for
Conservation, the Soil Conservation Society of America, Kortright
Sunday Outings and Claireville Canoeing: .
_ the Authority is participating in superguide (300,000) plus 300,000
copies of the Attractions with the Convention & Tourist Bureau of
Metropolitan Toronto. Distribution is underway~
_ news and photo releases, reflecting the Authority's and Foundation's
activities, have been written and distributed to media and School
Boards (total distributed - 30,750) ;
_ samples of 1,010 press clippings, on all aspects of the Authority's
activities, ~ave been received:
. _ eight special photo and four special news releases were written for
the Kortright Centre Official Opening (limited distribution) ;
_ one hundred and five colour television promos (one-minute), on the
Spring and Summer related activities of the Authority, have been
distributed and are in use;
_ one Authority exhibit was set-up and on display for Canada
Heritage Week in the Scarborough Town Centre and another was set-
up for the Glaireville Dam Tour:
_ the production and distribution of 1,500 copies of two issues of
"Highlights" and 600 copies of one issue of "Inside":
_ thirteen special photo assignments have been completed during this
p~riod :
_ three new one-minute colour public service films are now in progress
. (one for the' Kortright Centre for Conservation, one for Flood
Control and Water Conservation and one for The Metro~litan Toronto
and Region Conservation Foundation);
..
B-256
Page 2
TO: Chairman and Members of the Executive Committee,
M.T.R.C.A. - Meeting #11/79
RE: INFORMATION "AND EDUCATION DIVISION PROGRESS REPORT -
January 1 - June 30, 1979
- there are now new postage meter identification stamps, relating to
Authority activities (eg. Alert Your Children of the Dangers of
Spring Flooding; Black Creek Pioneer Village - open March 19 to
December 30, 1979; Season's Greetings; Write for a Free Colour
Brochure; Follow this Sign to the Conservation Areas; Managing
Your Renewable Natural Resources);
- invitations and programs were printed and arrangements were carried
out for Arbor Day, May 8. One hundred and fifty people attended;
- Authority presentations were made to the Oakville Kawanis Club,
the Woodbridge Vaughan Rotary Club, Thornhill, and the Shriners'
Club, Caledon;
- two special press previews were planned and carried at the Kortright
Centre for Conservation on June 11 and 12, to introduce the Centre
to the members of the media;
- staff took care of all physical arrangements for the Official
Opening of the Kortright Centre, June 2l, 1979 and 825 people were
in attendance;
- invitations to Authority members and letters to service recognition
award recipients were sent out in preparation for the Bill Davidson's
Day Garden Party at Black Creek Pioneer Village, which was held on
July 5;
- preliminary design work has been completed for the Authority's C.N.E.
Exhibit, that will be part of the Metroshow presentation by the
Municipality of ~~tropolitan Toronto. The Authority's theme will be
the 25th Anniversary of Hurricane Hazel;
- distribution of Authority brochures and Valley Regulations has been
completed to all municipal offices and many government agencies in
the watershed;
- notices have been sent out to inform all staff of the Town Hall
Meetings to be held on September 11 and 12 at the Kortright Centre;
- staff looked after invitations and R.V.S.P.'s for the Annual Sugaring
Off Day, held at Bruce's Mill Conservation Area, on April 7;
- staff attends regular meetings of the Attractions Council of the
Convention & Tourist Bureau of Metropolitan Toronto.
(b) EDUCATION
(i) Residential Field Centres:
- operating at about capacity;
- accommodating the usual range of elementary and secondary level
students and other groups such as girl guides, church groups, etc.;
- the summer programs that include the Archaeology credit course
for senior secondary students at Boyd, the March of Dimes summer
camp at Claremont and the York University course in Conservation
and Environmental Education (Geography 255) at Albion, will
accommodate the largest number of students this summer;
- the Practice Teaching Program of the Faculty of Education
students from both the University of Toronto and Althouse College
at the University of Western Ontario accommodated 67 student
teachers for one week each.
...3...
B-257
Page 3
TO: Chairman and Members of the Executive Committee,
M.T.R.C.A. - Meeting #11/79
RE: INFORMATION AND EDUCATION DIVISION PROGRESS REPORT -
January 1 - June 30, 1979
(il) Lake St. George Conservation Field Centre:
- the students from the various Metropolitan Toronto School
Boards contributed the partitioning, dry-walling, plumbing,
wiring, painting, sheet metal and heating installation to the
dormitory building;
- the Metropolitan Separate School Board built the beds and the
York County Board of Education have agreed to assist with the
clean up and landscaping of the area surrounding the buildings;
- the building will be occupied by September 4, 1979 and
completed by the end of September.
- the Metropolitan Toronto School Boards have approved the funding
for Stage II and it is anticipated that. the Metropolitan
Separate School Board and the York County Board of Education
will approve their share of the funding for Stage II, prior to
the end of September;
(iii) Kortright Centre for Conservation:
- officially opened on June 21, 1979, by the Ron. Robert Welch,
Deputy Premier, Province of Ontario;
- the Theme Report, for the design and program components related
to the Water Theme, was approved by the Water Technical Review
Committee;
- a Fund Raising Committee was established by the Foundation,
to raise $150,000;
- the development of the outside area includes:
(a) an operating sawmill;
(b) the filling and landscaping of the wildlife pond;
(c) the planting of trees and shrubs and the continued
extension of trail development;
(d) the development of the first phase of the patio;
(e) the completion of the entrance road plan.
(iv) Black Creek Pioneer Village:
- a high interest by teachers and students and the continuation
of the Practice Teaching Program for the Faculty of Education
students from the University of Toronto;
- the hosting of a number of teacher professional development
days.
FINANCIAL SUMMARY
A. Operations and Maintenance - Community Relations
Information & Education Operations.
Expenditures Expenditures Expenditures
1979 Budget To-Date , of Budget
~
$859.,000 $323,000 38'
Revenue Revenue Revenue
1979 Budget To-Date , of Budget
$757,700 $325,000 431
...4...
B-258
Page 4 Chairman and Members of the Executive Committee,
.TO:
M.T.R.C.A. - Meeting Ul/79
RE: INFORMATION AND EDUCATION DIVISION PROGRESS REPORT -
January 1 - June 30, 1979
B. Water and Related Land Management - Community Relations
Program (Wl 0)
1979 Expenditures Expenditures
Budget To-Date 11 of Budget
$471,194 231,747 4911
(project
elements)
$239,000 111,263 47'
(non-project
elements)
C. Conservation and Recreation Land Management -
Conservation Area Information and Interpretive Program (C3)
1979 Expenditures Expenditures
Budget To-Date , of Budget
$21,000 10,954 52'
FINANCIAL COMMENTS
(a) Operations and Maintenance - Community Relations
Expenditures are lower than anticipated and revenues are higher.
(b) Water and Related Land Management - Community Relations Program (WIO)
Project Elements:
(i) Expenditures for furnishings and equipment at Kortright are
in line with budget estimates. Exhibits, furnishings and
equipment development will have to be curtailed in the near
future, as a result of cash flow from the Foundation;
(ii)The development of Stage I of Lake St. George will exceed the
budget estimate and will be included in Stage II.
(c) Conservation Area Information and Interpretive Program (C3)
Expenditures are in line with budget estimates.
T. E. Barber, Administrato~,
Information & Education Division.
TEB/mrp
1979.07.18
B-259 CONSERVATION LAND ~~NAGEMENT DIVISION
PROGRESS REPORT
JANUA~Y - JUNE, 1979
Conservation Servi~es:
Private Land Assistance Programmes
Approximately 5,959 deciduous trees and 12,994 shrubs have been planted for
private landowners under the Farm Tree and Shrub programme. Reforestation'
plantings on private lands increased this year 80%, as approximately
146,000 seedling trees were planted. One reforestation subsidy has been
approved for a planting carried out in Uxbridge Township. Five private
tree spade rentals have been completed and 6 requests remain on file. Plant
progagation programme emphasis has resulted in a 50% increase in plant
material available for services programmes.
Stream Improvement
Stream improvement projects scheduled for the July and August have begun. Six
projects are planned. The Stream Enchancement Special Project is being
planned and co-ordinated in conjuction with the Ministry of Natural Resources.
This project will enable the Authority to carry out additional stream improve-
ment projects on cold water (trout) streams within the watershed on private,
public and Authority lands. Funding for the projects is available from the
S.P.O.F. programme (Strategic Plan for Ontario, Fisheries). This summer a
stream assessment programme is being undertaken on the headwaters of the
Humber River to assist in priori zing streams for future projects. This stream
assessment programme relates to the stream assessment work carried out by
the Ministry on the Duffin Creek.
Land Use Planning
Eight site visits have been carried out ~or private landowners concerned with
pond construction and aquatic weed control. One Conservation Plan is being
prepared for a landowner in Caledon Township. Eight site visits have been
carried out for farm tree and shrub programme, nine for private reforestation,
two for private tree spade rental. On June 3, 1979, Conservation Services
held a Conservation Field Day at the Palgrave Forest and Wildlife Area,
approximately 30 people participated. Promotion of services programmes has
resulted in the brochure and fact sheet on urban wildlife enhancement and
grassed waterways.
Authority Land
Forestry
Woodlot management has been carried out in the Boyd, Bruce's Mill and
Claireville Conservation Areas, with additional work scheduled for Glen Haffy,
Heart Lake, and Claremont. Woodlot management was also carried out at Lake
St. George. To date, there has been approximately llOcu. meters and 6,OOObd.ft.
of sawlogs produced. A portion of the sawlogs were taken to the Kortright
Centre sawmill.
Plantation management was carried out in a stand on the Gibson Lake property,
55 cubic meters of pulpwood were produced.
This summer plantation management plans are being prepared for Glen Haffy,
Palgrave and Glen Major.
Reforestation trees were planted at Glen Haffy Conservation Area lO,OOO,
Bolton Res. 1,500, Gibson Lake 10,000, Heart Lake 2,000, Boyd l,OOO, Lake St.
George 2,500, Cold Creek 7,700, Claireville 6,300, Glen Major 2,900, Kortright
Centre 3,900. These plantings represent a 50% increase from 1978.
Boy Scout groups from York Region planted 20,000 reforestation trees at
Claireville. Approximately 3,000 erosion control shrubs were supplied to the
Flood Control Section.
B-260
Stream Improvement
Stream improvement projects are planned for Claremont Conservation Area (Duffin
Creek), Humber Trails (Humber River) as well as Albion Hills.
Land Management
Biophysical inventories are being carried out at Claireville Conservation Area,
Boyd Conservation Area, and Greenwood Conservation Area to assist in the
preparation of resource management plans for Authority land.
Landscaping
A landscape project was carried out at the Kortright Centre for Conservation.
A tree maintenance programme is being carried out at the Humber Bay Waterfront
project. Plantings are anticipated to begin this year at the Thackeray Land-
fill site.
Conservation Areas:
Operations and Development
During the Winter, eight Conservation Areas were open for Winter activities.
Most staff time was involved with routine operations. The ski programme .
at Albion Hills operated at capacity. The Bruce's Mill programme ran below
capacity. As this part of the programme becomes better known, this situation
will improve. The improved ski trails at palgrave, Cold Creek, and Claremont
were well used. This past ski season was shorter than previous years due to
lack of snow in early January.
On May 31, 1979, an Open House was held at the Claireville Conservation Area
to launch the Authority's new canoe instruction and rental programme. As
part of the Visitor Services programme a promotional brochure and flyer were
circulated to schools, day camps, youth groups, and sports stores. Twenty-
eight groups attended day instructional sessions. Two weekend courses and one
evening course held were well attended by the general public. To date the
weekend rental demand for the 16 canoes and 8 rowboats has been at or near
capacity.
The preparation of the Conservation Areas for the summer season proceeded on
schedule. At Petticoat Creek the p'ool was resurfaced with asphalt and painted.
The winterizing procedures carried out have substantially reduced the pre-
season maintenance costs of that facility.
Forty-two student have been hired under the Experience Programme to assist
in routine operations, development and maintenance. This number includes 3
stude~ts who are working in a Visitor Survey of the Conservation Areas.
Twenty-four day camps have arranged to utilize Conservation Areas in their
summer programmes. Reservations for group picnics have equalled those of
1978.
Although the March approval of the Conservation Areas Development Budget
delayed,a number of development items, 60 picnic tables were constructed at
Petticoat Creek prior to the area's opening,
Plans have now been compl~ted for the Campground control building at the Albion
Hills Conservation Area which will include accommodation for the campground
~upervisor. Temporary accommodation for the 'Supervisor is being provided in
a rented trailer at present.
Preliminary plans for the Col~ Creek Trap Control Building were presented to
the Conservation Land Management Advisory Board. Plans for the further develo-
pment of the rifle range parking lot and gatehouse are underway.
B-261
During this period, staff finalized the Interim Conservation and Recreation
Land Management Plan. Copies have been sent to the Province of Ontario and
the Authority's member municipalities for comment. Staff have been meeting
with Town Councils and Planning Boards as requested.
To July 1st, 1979, Conservation Area attendance decreased 97,995 or 20.3'
over the same period in 1978. 'This is a result of lack of snow during the
early part of the Winter combined with a cool Spring. The following table
compares individual Area attendance figures to July 1st, with the same period
in the previous year.
1979, 1978
Albion Hills 73,327 102, l62
Boyd 56,132 76,877
Bruce's Mill 70,986 81,860
Claireville 27,324 33,544
Claremont 16 , 306 20,285
Cold Creek 14,606 20,147
Glen Haffy 28,966 26,406
Greenwood 2l,700 29,532
Heart Lake 37,893 56,352
Humber Trails 1,722 1,770
palgrave 5,898
Petticoat Creek 19, 868 19,364
Woodbridge 4 , 19 3 7,648
Indian Line Campground 5,290 6,239
384,211 482,186
Financial Statement - January - June 1979
Yr. to Date Total 'Budget Forecast To
Expend Commit Approp. Budget Used Dec. 31/79
Cons. Areas
I?evelop. 76,260 14,560 90,820 270,000 34% 270,000
Cons. Areas
Operate 596,700 lO,777 607,477 1,370,900 44% l, 370,800
Rent &
Utility Servo 19 , 211 - 19 , 211 39,000 49' 39,000
Private Land
Progra~e 64,468 1,770 66,238 113,000 58% 113,000
Authority Land
Progr~mme 28,668 - 28,668 95,000 30' 95,000
Cons. Area
Revenue 295,577 - 295,577 710,000 42% 710,000.
Private Land
Revenue 11,753 - 11,753 l5,OOO 78' l5,000
Financial Comments
To date 58% of Private Land Assistance Programme budget has been spent.
Conservation Areas Operations expenditures during this period are as antic-
ipated. Revenues are slightly down from previous years due to lack of snow
at the beginning of the Winter season, and a cool Spring. Both spenqing and
revenues will be within budget estimates.
TO: Exec\luve CCmni.ttee, M.T.R.C.A., '11/79
RE: AC:ninistration of ontario Regulation - March, April, May and June, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Borough of Etobiooke V-235, n.ttch Sisters Inn - Penni.t applied for and issued (see V-251 & V-252)
IDt 11 and 12 (Registered Owners)
Rear of 2161 Lakeshore Blvd. west March 15, 1979
Casa Mendoza ~staurant
Borough of Etobiooke V-236, Sanoor Paving - As above
IDt 11 and 12 March 15, 1979
Rear of 2161 Lakeshore Blvd. West
casa Mendoza Jeataurant
Borough of Etobiooke V-251, n.ttc:h Sisters Inn - Pemdt issued & revoked for violati.a1.
Rear of 2161 Lakeshore Blvd. West Mr. M. Iwaskykiw - lbauthorized material presently beinc;J renoved.
Mendoza. ~staurant and Inn June 28, 1979
Borough of Etobiooke V-252, Dutch Sisters Inn - As above
~ of 2161 Lakeshore Blvd. west Mr. WIl. Heam (tenant)
Waterfront June.28,1979
'lbwn of Caledon V-239, Dr. John Keith - Pond oonplete and 9raQing oonplete
IDt 32, Cone. 3 May 18, 1979 - Staff is satisfied
East of the 3m Line
North of the 30th Sideroad
200 feet into the bush
West bank of. tributaxy of Hunber River (I)
0
/It =
tIj
1979.07.16 g
t'4
tIj 1Il
I
. I\J
0 en
. I\J
b'
Executive CCmnittee, M.T.R.C.A., 111/79 I
'10: IIJ
en
RE: Mninistration of Ontario Regulation - March, April, May and June, 1979 w
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Borough of Etabiooke V-237, Blyth Hill Holdings Filling stq)ped ilrm:!diately
Lot 12, Can. 1, R.P. 4532 March 28, 1979 i- Owners presently 1NOrking with staff and Etabiooke
North side of Rathburn lbad
East of Martin Grove
Mimioo Creek Watershed
Borough of Etobiooke V-238, Mazza Bros. Haulage As above
Lot 12, Canc. 1, R.P. 4632 March 28, 1979
North side of Rathburn lbad
East of t-1artin Grove
Mimioo Creek Watershed
City of Mississauga V-240, Frank & Lois MamtDliti Staff is m:ni.toring site
Lot 110, Plan 722 May 18, 1979
East side of Ponytrail Drive
west bank of Etobiooke Creek
approx. half way bebleen Bloor Street
and Burnhamthorpe lbad
City of Branpton V-24l, ~ G:llf Club Site graded to the satisfaction of the staff of the
Lot 6, Canc. 9 May 18, 1979 M.T.R.C.A.
150 feet east of the 8th Line on
the east bank of the west branch
of the Hunber River
Town of Ric:tmDnd Hill V-242, Magpie-Managerie Holdings - Di.scussia1s ~ with the property a.mer.
at the. dead end of Birch Avenue off (Dr. Solway)
Bathurst Street, west of the. D:m River June 1, 1979
Lot 15, R.P. 1960, Cone. 1 W.Y.S.,
Ilt
1979.07.16
'ro: Executive Camlittee, M.T.R.C.A., 111/79
RE: Administration of Ontario Regulation - March, April, May and June, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN.
'1\JWn of Ric::hm:md Hill V-243, Green & lbJdward Qlnst., - Staff to follow up
at the dead end of Birch Avenue off June 1, 1979
Bathurst Street, west of the I))n River
Lot 15, R.P. 1960, Oonc. 1 W.Y.S.,
Borough of J;:tobicoke V-244, Bxown JlcJ:es ~., - Filling stopped ilmedi.ately
Lot 28, R.P. 1176 June 5, 1979 - No further acti.a1 necessary
~ar of 2135 Lakeshore Blvd. west
(Casa Iana !btel)
City of Mississauga V-245, M:>reni.sh land ~. Ltd., - Graded to the satisfacti.a1 of the M.T.R.C.A.,
on the floodplain of the west bank of June 6, 1979
the Etobicoke Cree, Block · JJ', R.P. M-58
North side of Burnhamthorpe !bad
Garnetwood Park
City of Mississau~ . V-246, Pleasant View Farms Ltd., - Staff following up
on the south side of ~ st. East June 14, 1979
~ mile east of Dixie !bad, east bank
of Little Etobicoke Creek at culvert
Pt. Lot.4, Con. 1 S.O.S.,
'1\JWn of vaughan V-247, Luigi Bros.. Paving (b., - Presently wrldng with staff to d:>>tain pmnit
North side of Peeler !bad June 15, 1979
west of 126 Peeler !bad
H\mber River watershed
11t
1979.07.l6
117
I
'"
O'l
..
tit
I
'ro: Executive Camlittee, M.T.R.C.A., 111/79 hJ
en
RE: 1ICnini.stration of Ontario Regulation Maxdl, April, May and June, 1979. VI
-
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
City of Mississauga V-248, Edward J. Kason - F\u:ther action to be taken.
Pt. Lot 17, R.P. 598 June 19, 1979
South of Dundas Street
SOUtheast of Mattawa Avenue
Rear of 1914 Mattawa Avenue
Etobiooke Creek Watershed
'lbWn of Riclmond Hill V-249, Mr. Earl IDwe - Void.
Lot 20, R.P. 202 June 26, 1979 - Violation sent to previous owner in error
North side of King Sidemad - Ie-issued to Mari Construction (V-255)
West of Yonge Street by about 800 feet - Staff is discussing situation.
on east bank of wateroourse
Huntler River Watershed.
'lbWn of Markham V-250, Mr. Heru:y J. Gertner - Staff will request soils test to be taken before any
Pt. Lot 96, R.P. 2368 June 27, 1979 further consideration is given to the applicant for
Parts 12-13, Plan 64~5979 &tabilization works.
West of Bayview Avenue
North of Proctor Avenue
~ River Watershed.
City of Mississauga V-253, Langvi.lle Dev. Ltd., - Staff endeavouring to have matter cleared up.
Pt. lot A, Cone. 1 S.O.S. June 28, 1979
Sou:th of nmdas St. East
West bank of Etobiooke Creek
Rear of 2150 Dundas Street East
Borough of Etobiooke V-254, Plastics Canada - Filling stopped
"Lot 284, R.P. ~137 June 29, 1979 - Qmer presently preparing penni.t application
Mimioo Creek Watershed
/It
1979.07.16
'ro: Executive Camlittee, M.T.R.C.A., 111/79
BE: ACninistration of Ontario Regulation - Man:h, April, May and June, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Town of Ric:hnDnd Hill V-255, Mari ConstnJction Ltd., -Staff is discussing situation.
IDts 17-19, R.P. 202 JW1e 29, 1979
North ~ide of King Sideroad
wast of Yonge Street
East bank of the wateroourse
HlIJTber River Watershed.
. .
.
o:r.
1979.07.16
tJJ
I
'"
en
en
~ 8-267
,
the metropolitan toronto and region conservation authority
minutes Report 112/79
EXECUTIVE COMMITTEE WEDNESDAY-AUGUST-lS-1979 112/79
-
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, August lS, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Benderson
Vice Chairman Mrs. F. Gell
M.J. Breen
E. H.. CareS
Mrs. J .A. Gardner
Mrs. L. Bancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Acting Secretary-Treasurer W.A. McLean
Adm. - Finance Division A. D. Harris
Superintendent of Operations, CLMD J.D. Agnew
Head, W/F Section, Water Resource Division B.E. Denney
Planning TeChnician, Planning & policy B.E. Knox ,
Head, Flood Control Section, WRD J .C. Mather
Planning Technician, Planning & Policy M.C. Piper
The staff advised that the application of Hungry Lion Restaurant Limited baeS been
withdrawn by the applicant pending preparation of additional information.
BEARING
Following the Rol~ Call, the meeting recessed to hold a Hearing re:
Mr. Byron Karrys (Chateau Caterers Limited)
Town of Markham
Rouge River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Ge'l!
Members M.W.B. Biggar
M.J. Breen
E.B. Card
Mrs. i.A. Gardner
Mrs. L. Bancey
C.F. Kline
E.V. Kolb
Dr: T.H. Leith
Mrs. S. Martin
J.S. Scott
Acting Secretary-Treasurer W.A. McLean
Adm. - Historical Sites Division R.K. Cooper
Adm. - Finance Division A.D. Harris
Adm. - Property & Administration Division W.E. Jones
Superintendent of Operations, CLMD J.D. Agnew
Head, W/F Section, Water Resource Division B.E. Denney
Head, Conservation' Education Section, I&ED Miss A.. Bayboe
Planning TeChnician, Planning & policy B.E. Knox
Head, Flood Control Section, WRD J.e. Mather
Planning TeChnician, Planning & Policy M.C. Piper
,'B-268 -2-
MINUTES
The Minu~es of Meeting .11/79 were presented.
Res. '313 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: The Minutes of Meeting '11/79, as presented, be adopted as if read.
CARRIED,
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS ITS ADOPTION:
1. PROJECT C.A.-68
-A Project for the Extension of the
Heart Lake Conservation Area
A staff communication was presented advising that an option has been obtained
to purchase approximately 15.5 ha. (38.38 acres) of land at the north-east
corner of the Heart Lake Conservation Area, for the sum of $300,000,00, plus
legal costs.
The subject land, located at the south-west corner of the 17th Sideroad and
the Heart Lake Road, is within the project boundaries of the Heart Lake
Conservation Area, and consists of a variety of topography ranging from table
land in the northern portion to low-lying swamp lands in the south,
including two small lakes.
Res. '314 Moved by: E.V. Kolb
Seconded by: Mrs. J.A. Gardner
,
RESOLVED THAT: Project C.A.-68 - A Project for the Extension of the Heart Lake
Conservation Area, be adopted; and
THAT the funding for this project be derived from Authority revenues;
.AND FURTHER THAT the Minister of Natural Resources be requested to approve of
this project;
AND FURTHER THAT the appropriate Authority officials be authorized to take
whatever action is required in connection with this project, including.the
execution of any necessary documents. CARRIED;
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
2. REPORT #3/79 - PERSONNEL
SUB-COMMITTEE
Res. '315 Moved by: E.V. Kolb
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Executive Committee meet in closed session to discuss
Report #3/79 of the Personnel Sub-Committee.
CARRIED,
The Committee met in closed session.
Res. .316 Moved by: E.V. Kolb
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Executive Committee resume its meeting in open session.
CARRIED,
The Meeting resumed in open session.
Res. 1317 Moved by: Mrs. L. Hancey
Seconded by: Dr'. T.H. Leith
RESOLVED THAT: Report .3/79 of the Personnel Sub-Committee be received,
approved and appended as Schedule "An of these Minutes.
CARRIED,
-3- B-269
3. REPORT 14/79 - MANAGEMENT STUDY
REVIEW SUB-COMMITTEE
Res. '318 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: The report of Hickling-Johnston Limited, entitled .Study
Outline: Organizational Review - The Metropolitan Toronto and Region
Conservation Authority", dated August 14, 1979, be received and appended as
Schedule "B" of these Minutes~ and
THAT the firm of Hickling-Johnston Limited, Management Consultants, be engaged
to carry out Phase 1 of the Organizational Review Study, as set out in their
proposal dated August 14, 1979, at a cost not to exceed $ll,OOO.OO, for
professional services, and study expenses not to exceed $1,000.00, subject to
the approval of the Province of Ontario.
On a recorded vote - voting "YEA" 8 Voting "Nay. 4
M.W.H. Biggar R.G. Henderson
M.J. Breen Mrs. F. Gell
E.H. Card E.V. Kolb
Mrs. J.A. Gardner Dr. T.H. Leith
Mrs. L. Hancey
C.F. Kline
Mrs. S. Mart.in
J.S. Scott CARRIED ~
Motion Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
WHEREAS at the meeting of The Metropolitan Toronto and Reg~on Conservation
Authority held June 22, 1979, a commitment was made or implied that, before
proceeding with the Management Study, the approval of the Authority be
received;
THEREFORE the Chairman be requested to call a special meeting of the Authority
at the earliest possible date, as set out in the Regulations, to consider the
proposed Management Study.
THE MOTION WAS -------------------------------------------------- NOT CARRIED,
4. REPORT 13/79 - TENDER OPENING SUB-COMMITTEE
-Proposed Erosion Control Work: 135 Canyon
Avenue, City of North York (Don River
Watershed)
Report 13/79 of the Tender Opening Sub-Committee was presented.
Res. '319 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: Report i3i79 of the Tender Opening Sub-Committee, as amended, be
received and appended as Schedule "C" of these Minutes, and
THAT all tenders received for the proposed Erosion Control Work at '35 Canyon
Avenue, City of North York (Don River watershed), be referred to the consult-
ants, Chisholm, Fleming & Associates, for their review and report, with
recommendations, to the Executive Committee Meeting to be held on Wednesday,
September 5, 1979.
CARRIED,
5. DELEGATION OF AUTHORITY (STAGE II, MANAGEMENT
IMPROVEMENT PLAN)
-Section 23 Submissions for Minister's Approval
The Committee reviewed a communication from Mr. R.J. Burgar, Director of the
Conservation Authorities Branch, Ministry of Natural Resources, advising that
under new procedures, the Regional Director of the Ministry will recommend
Authority projects or programmes directly to the Minister's office, and that
the Conservation Authorities Branch will no longer be involved in the review
or processing of Section 23 submissions.
B-270 -4-
Res. 1320 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOLVED THAT: The communication received from Mr. R.J. Burgar, Director of
the Conservation Authorities Branch, Ministry of Natural Resources, concer~in9
Delegation of Authority: Section 23 submissions for Minister's Approval, be
received for info~ation.
CARRIED;
6. JUNIOR CONSERVATIONIST AWARD PROGRAMME
-Ministry of Natural Resources
A communication from the Junior Conservationist Award Programme, having regard
to an invitation to attend the final banquet for the programme, was withdrawn.
7. CANADIAN INSTITUTE OF FORESTRY
-1979 Annual Meeting - Jasper, Alberta
September 30-0ctober 4: Attendance at
A communication from the Secretary-Treasurer was considered, requesting
authorization for his attendance at the Canadian Institute of Forestry Annual
Meeting in Jasper, Alberta, September 30th to October 4th inclusive, at an
estimated cost of $500.00.
Res. 1321 Moved by: J.S. Scott
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Secretary-Treasurer be authorized to attend the Canadian
Institute of Forestry 1979 Annual Meeting in Jasper, Albert~, from September
30th to October 4th inclusive, 1979, atan estimated cost of $500.00, and
BE IT FURTHER RESOLVED THAT Mr. E.V. Kolb and Mrs. F. Gell,be also authorized to
attend and that their expenses in connection therewith be paid.
CARRIED;
8. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE
-The Devonian Group of Charitable Foundations
The Committee reviewed a communication received from Mr. W.G.H. RObinson,
Secretary of The Devonian Group of Charitable Foundations, advising that the
Devonian Group would not be making a donation towards construction of a
Visitor Centre at the Black Creek Pioneer Village.
Res. 1322 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The communication dated 25 July, 1979, received from The
Devonian Group of Charitable Foundations, be received for information.
CARRIED;
9. TOWN OF CALEDON
-Tour of Authority.Lands
A communication was presented advising of a proposed tour of Authority
facilities by the Town of Caledon, and the Committee was advised that a
tentative date of September 26, 1979 has been suggested.
Res. 1323 Moved by: E. V" Kolb
Seconded by: C.F. Kline
RESOLVED THAT: The staff be directed to arrange a tour of Authority lands
situated in the Town of Caledon for Town Councillors and Planning staff, the
Executive Committee and Conservation Land Management Advisory Board of The
Metropolitan Toronto and Region Conservation Authority, during September, 1979,
for the purpose of viewing Authority lands and management techniques; and
THAT the cost of this tour, including lunch, be borne by the Authority.
CARRIED;
-5- B-271
10. NATIONAL TRAILS SYMPOSIUM, DULUTH, MINNESOTA,
SEPTEMBER 4-7, 1979:
-Attendance at
A staff communication was presented advising that the topics of sessions aDd
workshops at the above-noted sYmposium will include trail design, construction
and maintenance, liability of land owners, use of public lands and rights-of-
way for trail development, and multiple use of trail corridors. It is
anticipated that the symposium will offer a variety of approaches to the use
of public lands for recreational trails.
Res. '324 Moved by: Mrs. F. Gell
Seconded by: E.V. Kolb
RESOLVED THAT: Ms. Adele Freeman, Conservation Areas PLanner, be authorized to
attend the Fifth National Trails Symposium, to be held in Duluth, Minnesota,
September 4-7, 1979, and that her related expenses, in the estimated amount of
$500.00 (Canadian Funds), be paid.
CARRIED;
ll. BLACK CREEK PIONEER VILLAGE SHELTERS
-Quotation #79-38: Hydro Service
A staff communication was presented advising that the following quotations
have been received for the supply of equipment, material and labour required
for the installation of two 100 amp services to the Black Creek Pioneer
Village shelters (classroom portables) :
Bolton Power Line Limited $3,l95.00
K-Line Maintenance & Construction Ltd. 4,993.75
Black & McDonald Limited 8,233.00
Thor powerline --
Res. '325 Moved by': J.S. Scott
Seconded by: E.H. Card
.RESOLVED THAT: The quotation received from Bolton Power Line Limited, for the
supply of all equipment, material, labour, permits and inspection fees, and
all necessary approvals required for the installation of two 100 amp services
to the Black Creek pioneer Village shelters, in the sum of $3,l95.00, be
accepted; it being the lowest quotation received.
CARRIED,
12. ALBION HILLS CONSERVATION AREA
-Quotation #79-37: Camp Supervisor'S
Office/Residence
A staff communication was presented advising that the following two quotations
(of 5 invitations) have been received for the supply of all materials and work-
manship necessary to construct a building for the supervision of the Albion
Hills Campground. This building includes an office, as well as a residential
area containing a kitchen, bathroom, living room and two bedrooms:
Eric Holmes Construction .$33,415.00
Span Construction 34,640.00
Res. '326 Moved by: E.V. Kolb
Seconded by: M.J. Breen
RESOLVED THAT: The quotation received from Eric Holmes Construction for the
supply of all materials and work required for the construction of the Camp
Supervisor's office/residence at the Albion Hills Conservation Area, in the
sum of $33,415.00, be accepted, it being the l~west quotation received.
l3. CARRIED J
FINANCIAL REPORT AND ACCOUNTS
-July, 1979
Mr. Scott presented the Financial Report and Accounts for the month of July,
1979.
Res. t'327 Moved by: J.S. Scott
Seconded by: E.H. Card
B-272 -6-
RESOLVED THAT: The Financial Statement for the month of July, 1979, be
received; and that payment of the Authority accounts, in the amount of
$1,039,545.65, being (a) Current Expenditures - Wages & Salaries $320,988.42;
Materials & Supplies $360,482.46; (b) Capital Expenditures - Wages & Salaries
$36,917.29; Materials & Supplies $281,097.18; (c) Other Programmes - Wages &
Salaries $38,434.86; Materials & Supplies $l,625.44, be approved. CARRIED;
Res. '328 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
.
RESOLVED THAT: The Meeting recess for lunch. CARRIED,
THE MEETING RECONVENED AT 1:15 P.M.
14. ALBION HILLS CONSERVATION FIELD CENTRE
-Quotation .79-43: Riding Lawn Mower
A staff communication was presented advising that the following quotations have
been received for the supply and delivery of one new 1979 riding lawn mower for
the Albion Hills Conservation Field Centre:
Clark Moore Motors $.4,470.14
Schomberg Ford Sales 4,908.51
Outdoor Power Equipment 4,943.58
Nobleton Farm Service 4,994.00
Res. #329 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The quotation received from Clark Moore Motors for the supply
and delivery of one new 1979 riding lawn mower, in the sum of $4,470.14, be
accepted; it being the lowest quotation received. CARRIED;
15. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Carpeting
A staff communication was presented advising that the following quotations have
been received for the supply and installation of carpeting in the dormitory
building at the Lake St. George Conservation Field Centre:
Supplier Type of Carpeting Price Quoted
Simpson's Indoor/Outdoor Ozite $1,963.55
Al Bender (Bender
Rug Company) Town & Terrace Ozite 2,160.00
Girrard Carpeting,
Stouffville Indoor/Outdoor Ozite 2,450.00
Res. 1330 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The quotation received from Simpson's (ContractJDivision) for
the supply and installation of carpeting in the dormitory building at the Lake
St. George Conservation Field Centre, in the amount of $1,963.55, be accepted,
it being the lowest quotation received. CARRIED;
16. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Bunk Mattresses, Pillows and
Blankets
A staff communication was presented advising that the following quotations have
been received for the supply and delivery of 38 bunk mattresses, 36" wide x 72-
long x 4" thick, foam; 38 pillows 100% cotton, chipped foam; and l6 blankets
l80" x 230", for the dormitory 'building at the Lake St. George Conservation
Field Centre:
Supplier Price Quoted
Simpson's $1,967.60
Eaton's 2,578.50
The Bay 3,745.46
,
Res. '331 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The quotation received from Simpson's (Contract Division) for
the supply and delivery of 38 bunk matressess, 38 pillows and 16 blankets for
the dormitory building at the Lake St. George Conservation Field Centre, in the
amount of $1,967.60, be accepted; it being the lowest quotation received.
CARRIED;
-7- B-273
17. KORTRIGHT CENTRE FOR CONSERVATION
-Quotation: Sand & Gravel for Trails
A staff communication was presented advising a further 1,000 tons of stone and
gravel are required for the development of trails at the Kortright Centre ~or
Conse rva tion.
Res. '332 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: A further 1,000 tons of stone and gravel, for the development
of trails at the Kortright Centre for Conservation, be purchased from Indusmin
Limited on the basis of their quotation dated May 11, 1979 and accepted at
Executive Committee Meeting #6/79, held May 16, 1979.
CARRIED J
18. OCCUPIERS' LIABILITY AND TRESPASS TO PROPERTY
-Discussion Paper: Ministry of the Attorney
General
The Committee reviewed a communication from the Ministry of the Attorney
General, advising of the Ministry's consideration of Authority comments made
on the Discussion Paper: Occupiers' Liability and Trespass to Property
forwarded to the Ministry following Meeting #8/79 of the Executive Committee.
Res. *333 Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: The communication received from the Ministry of the Attorney
General, dated July 17, 1979, concerning Occupiers' Liability and Trespass to
Property, be received; and
THAT the staff be directed to refer to the Ministry of Na~ural Resources,the
advice from the Ministry of the Attorney General concerning amendments to The
Conservation Authorities Act required to deal with the matter of possible
employee liability to trespass actions while pursuing their responsibilities
in the administration of Ontario Regulation 735/73, made pursuant to Section
27 (l) (d) of The Conservation Authorities Act.
CARRIEDJ
19. DECISION OF HEARING
-Hungry Lion Restaurant Limited
City of Mississauga
Etobicoke Creek Watershed
Res. 1334 Moved by: Mrs. S. Martin
Seconded by: Dr. T.H. Leith
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this l5th day of August, 1979; and
THAT the application of Hungry Lion Restaurant Limited, in accordance with
Ontario Regulation 735/73, for permission to construct a drive-in-drive-
.. through fast oil change and lubrication centre on the flood plain of the
Etobicoke Creek, as defined by the Regional Storm, on Part of Lot 'A',
Concession 1, N.D.S., City of Mississauga (Etobicoke Creek watershed), be with-
drawn at the request of the applicant, Mr. D. Strynadka, without prejudice,
and resch~duled at a later date.
DECISION OF HEARING CARRIED,
20.
-Mr. Byron Karrys (Chateau Caterers Limited)
Town 0 f Markham
Rouge River Watershed
Res. '335 Moved by: Mrs. S. Martin
Seconded by: Dr. T.H. Leith
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this lSth day of August, 1979J and
THAT the application of Mr. Byron Karrys (Chateau Caterers Limited), in
accordance with Ontario Regulation 735/73, for permission to construct a
building on the flood plain of the Rouge River, as defined in the Schedule to
the Regulation, on Part of Lot ll, Concession 6, TOwn of Markham (Rouge River
B-274 -8-
watershed), be approved, subject to:
.The building being flood-protected to the
Regional Storm elevation of 571.5 feet.
CAR~IED;
21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Malton Fruit Market
To construct a building and parking lot in the area
defined in the Schedules to the Regulation as Sheet '8
of the Mimico Creek, City of Mississauga
A staff communication was presented advising that an application has been
received from the Malton Fruit Market for permission to construct a building
and parking lot at the above location.
Res. t336 Moved by: C.F. Kline
Seconded by: J,S. Scott
RESOLVED THAT: The staff communication, together with the application of the
Malton Fruit Market, be receivedi and
THAT the application of the Malton Fruit Market for permission to construct a
building and parking lot in the area as defined in the Schedule to the
Regulation as being Sheet No.8 of the Mimico Creek, City of Mississauga, be
approved, subject to:
(a) The proposed construction being in accordance with the site plan as
prepared by J. Paul Smith & Associates, Architecti
(b) No fill of any kind being placed on the flood plain as defined by
the Regional Stormi
.
(c) The application complying with all existing municipal regulations
and by-laws;
(d) Every effort being made to minimize silting of the creek during
construction.
CARRIED i
22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Borough of Scarborough
To construct storm sewer energy dissipating structure
on beach area of Scarborough Bluffs, west of Brimley
Road (Waterfront)
A staff communication was presented advising that an application has been
received from the Borough of Scarborough for a permit to modify the existing
storm sewer outlet adjacent to Bluffers Park Phase I at the above location.
Res. t337 Moved by: M.W.H. Biggar
Seconded by: J.S. Scott
RESOLVED THAT: The staff communication, together with the application of the
Borough of Scarborough, be received; and
THAT the application of the Borough of Scarborough for a permit to construct a
storm sewer energy dissipating structure on the beach area of the Scarborough
Bluffs, west of Brimley Road, be approved, subject to:
(a) The work being carried out in accordance with the specification drawings,
(b) The Authority being notified of the start of construction.
CARRIED,
23. LIGHT RAIL TRANSIT TO MALVERN
-Evaluation of Alternative Alignments
A staff' communication was presented advising that the Autho~ity is in receipt
of Clause No.1 of Report No.lO of the Metropolitan Planning Committee, adopted
without amendment by the Council of The Municipality of Metropolitan Toronto at
its meeting held June 19, 1979. The report deals with a proposal for a Light
Rail Transit Line linking the Scarborough Town Centre to the Malvern Community.
-9- B-275
Res. '338 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The report and request of Metropolitan Council regarding nLight
Rail Transit to Malvern - Evaluation of Alternative Alignments", be received,
and
THA~ Metropolitan Council be advised of the Authority's willingness, subject to
the concurrence of the Metropolitan Parks Department, to set aside the
designated Authority-owned lands for Metropolitan acquisition if and when a
decision is made to construct a Light Rail Transit extension to the Malvern
Community;
AND FURTHER THAT the Authority be consulted regarding design criteria, under
Ontario Regulation 735/73, should a decision be made to proceed with
construction.
CARRIED,
24. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl
Don River Watershed Component
-Property: The Corporation of the City of North York
Res. '339 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Report (July 25, 1979) set forth herein, received from the
Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED'
-Re: Project: Interim Water and Related Land Management
Project 1979-1981 - Flood Plain and Valley
Land Acquisition Component - Do~ River Watershed
Authority: Executive Resolution No.133, Meeting No.4 - April
12, 1978 and Authority Resolution No.5l, Meeting
No.3 - April 21, 1978
Subject Property: East of Bathurst Street, north of Sheppard Avenue
OWner: The Corporation of the City of North York
Area to be Acquired: 2.902 acres, more or less
Reconunended Nominal consideration of $2.00, plus legal costs
Purchase Price:
"Included in the requirements for the above-noted project are two irregular~
shaped parcels of land, being Parts of Lots 16 and 17, Concession I, W.Y.S.,
and Part of Lots 28 and 29, Registered Plan 2069, City of North York, The
Municipality of Metropolitan Toronto, located east of Bathurst Street, north
of Sheppard Avenue, in the vicinity of Canyon Avenue.
-Negotiations have been conducted with officials of the Corporation of the
City of North York, and, subject to the approval of your conunittee, agreement
has been reached with respect to a purchase price, as follows:
The purchase price is to be the sum of $2.00, plus legal costs.
nI recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses in-
curred incidental to the closing, for land transfer tax, legal costs and dis-
bursements are to be paid. The Authority is to receive a conveyance of the
lands required free from encumbrance.
-The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
nFunds are available.
-An application has been made to the Minister of Natural Resources for an
Inspection Certificate.-
25. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl
Humber River Watershed Component
-Property: N. & M. Zoltay
Res. 1340 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
B-276 -10-
RESOLVED THAT: The Report (August 7, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED,
liRe: Project: Interim Water & Related Land Management
Project 1979-1981 - Flood Plain and Valley
Land Acquisition Component - Humber River Watershed
Authority: Executive Resolution No.133, Meeting No.4 - April 12,
1978 and Authority Resolution No.51, Meeting No.3 -
April 21, 1978
Subject Property: 152 King Street East, Bolton
OWners: N. & M. Zoltay
Area to be Acquired: 1 acre, more or less
Recommended $38,000.00, plus Vendors' legal costs
Purchase Price:
"Included in the requirements for the above-noted project is an irregular-
shaped parcel of land, being Lots 26, 27 and 183, Block 1, Plan BOL-7, Town of
Caledon, The Regional Municipality of Peel, located on the south side of King
Street East, on the easterly edge of the Village of Bolton. Situate on the
property is a one-storey, two-bedroom, insulbrick-clad frame dwelling.
"Negotiations have been conducted with the owners and their solicitor, Mr.
T.R. Williston of the legal firm Scharf & Williston, 103 Collier Street,
Barrie, L4M lH2; and, subject to the approval of your Committee, agreement has
been reached with respect to a purchase price, as follows:
The purchase price is to be the sum of $38,000.00, plus Vendors' legal
costs, with the transaction to be completed on or before January 3l,
1980.
DI recommend approval of this purChase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses in-
curred incidental to the closing, for land transfer tax, legal costs and dis-
bursements, are to be paid. The Authority is to receive a conveyance of the
land required free from encumbrance.
BThe Administrator of the w.ater Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
BAn application has been made to the Minister of Natural Resources for an
Inspection Certificate.
26. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l
-Proposed Engineering Study: Nos.100-102 Gwendolen Crescent
Vicinity, City of North York (Don River Watershed)
A staff report was presented advising that as outlined in the report DErosion
Control and Bank Stabilization in Metropolitan Toronto - 1979 ProgrammeD, which
was approved by the Executive Committee at Meeting #15/78, remedial work is
proposed to be carried out,at Nos~100-102 Gwendolen Crescent vicinity, City of
North York, in 1980.
Res. #341 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff be authorized to retain the firm of Andrew Brodie
Associates- Inc., Consulting Engineers, to carry out an engineering study to
determine the extent and causes of the erosion problem at Nos. 100-102
Gwendolen Crescent vicinity, City of North York (Don River watershed), at a
cost estimated to be $4,.300.00.
CARRIED;
27. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Proposed Erosion Control Work: #35 Canyon Avenue, City
of North York (Don River Watershed) AWARD OF CONTRACT
THIS ITEM WAS WITHDRAWN.
-11- B-277
28. WATERFRONT PROJECT: 1977-1981
Etobicoke Sector - Humber Bay East Waterfront Area
-Pond System: Separator Cloth.
A staff communication was presented advising that quotations have been
received for the supply of a separator cloth to be installed in the bed of a
man-made pond being constructed in the Humber Bay East landfill site. Each
supplier markets a product of identical quality.
Supplier Product Price
(a) Bay Mills Ltd. Nicolon Division Nicolon LD500 5.2~ sq. ft. F.O.B.
Toronto
(b) Terrafix Erosion Control Terratrack T24l5 5.2~ sq. ft. F.O.B.
Products Inc. Milton
(a) & (b) Federal Tax incl.
PST extra if applic.
Res. 1342 Moved by: M.W.H. Biggar
Seconded by: C.F. Kline
RESOLVED THAT: The quotation received from Bay Mills Limited for the supply of
aNicolon LD500" for installation in the bed of a man-made pond in the Humber
Bay East landfill site, at 5.2C sq.ft., F.O.B. Toronto, be accepted;
CARRIEDJ
29. WATERFRONT PROJECT: 1977-1981
Etobicoke Sector - Humber Bay East Waterfront Area
-Pond System: Stone
A staff communication was presented advising that quotations have been received
for the supply of aggregate stone material to be laid on the bed of a man-made
pond at the Humber Bay East landfill site:
Supplier Price
(a) Highland Creek Sand and Gravel $3.35 per ton
(b) Superior Sand and Gravel 3.S5 per ton
(c) Consolidated Sand and Gravel 3.60 per ton
(d) Dufferin Aggregates 3.20 per ton
Res. '343 Moved by: C.F. Kline
Seconded by: M.J. Breen .
~
RESOLVED THAT: The quotation received from Dufferin Aggregates for the supply
of fine aggregate stone material, in the amount of $3.20 per ton, be accepted,
it being the lowest quotation received.
~ CARRIED,
30. WATERFRONT PROJECT: 1977-1981 ".
Bluffers Park Phase II
-Design of Mechanical & Electrical Services
A staff communication was presented advising that an estimate has been
received for the cost of services required to design mechanical and electrical
services at the above location. ,
.
Res. '344 Moved by: Mrs. S. Martin
Seconded by: M.W.H. Biggar
RESOLVED THAT: The firm of D.E. McGregor & Associates Limited be retained to
prepare the final design, contract drawings and to provide field supervision
for the construction of the electrical supply and sewer and water main require-
ments for Bluffers Park Phase II Boating Federation site, at an estimated upset
cost of $7,000.00.
CARRIED'
, ,
.
B-278 -12-
NEW BUSINESS
3l. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Drapes
A staff communication was presented advising that the followinq quotations have
been received for the supply of material and track, and for installation of un-
lined drapes in 13 bedroom windows of the dorm!tory building at the Lake St.
George Conservation Field Centre:
,'f; '-: ~rice O_ted
Supplier
National Draperies $1,018.61
Simpson's 1,183.70
Eaton's 1,287.00
Res. 1345 Moved by: Dr. T.H. Leith
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The quotation received from National Draperies for the supply of
material, track and installation of unlined drapes in 13 bedroom windows of the
dormitory building at the Lake St. George Conservation Field Centre, in the
amount of $1,018.61, be accepted, it being the lowest quotation ~eceived.
CARRIED,
32. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-198~
-Proposed Erosion Control Work: #35 Canyon Avenue, City
of North York (Don River Watershed) - APPROVAL OF DESIGN
-and- OWNER PARTICIPATION
Res. t346 Moved by: M.J. Breen
Seconded by: Mr s . L. HiIilcey
RESOLVED THAT: The item: Interim Wate~ & Related Land Management project 1979-
1981 - Proposed Erosion Control Work: t35 Canyon Avenue, City of North York,
Don River watershed (approval of design -and- owner participation) be deferred
for consideration at Meeting 113/79 of the Executive Committee, to be held
September 5, 1979.
CARRIED,
33. CANADIAN NAT~ONAL EXHIBITION:
AUTHORITY PARTICIPATION
-Special Pass to Authority Facilities
The proposed Special Pass to Conservation Authority facilities for distribution
at the C.N.E. exhibit was discussed.
Res. 1347 Moved by: Dr. T.H. Leith
Seconded by: E.V. Kolb
RESOLVED THAT: The Special Pass for admission to facilities of The
Metropolitan Toronto and Region Conservation Authority for distribution at the
Canadian National Exhibition exhibit, with the letters "C.N.E." deleted, be
approved.
CARRIED;
AMENDMENT Moved by: Mrs. S. Martin
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Special Pass to f.acilit.ies of '!'he Metropolitan Torontp and
Region Conservation Authority be amended ~o. delete the prevlaien fo~ half-price
entrance to the Black Creek Pioneer Village and the K~tright Centre 'for
Conservation; and
THAT entrance to these facilities be free.
THE AMENDMENT WAS ----------------------------------------------- NOT CARRIEDI
-l3- B-279
34. BLACK CREEK PIONEER VILLAGE
-Visitor Centre
Res. .348 Moved by: M.W.H. Biggar
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Staff work continue on the preparation of presentation material
for the Black Creek Pioneer Village Visitor Centre, on the basis of the
l4,OOO sq. ft. First Phase and on the total project; and
THAT the support of The Metropolitan Toronto and Region Conservation Foundation
be requested in determining possible donors.
CARRIED,
35. ADJOURNMENT
On Motion, the Meeting adjourned at 2:30 p.m.
R. Grant Henderson W. A. McLean, Director of Planning and POlicy
Chairman Acting secretary-Treasurer
B-280
SCHEDULE "A"
TIlE METROPOLITAN TORONTO AND REGION CONSERVATION AUmORITY
REPORT '3/79
PERSONNEL SUB-COMMITTEE
The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive, DOWNSVIEW,
Ontario on Wednesday, August 8, 1979 commencing at 10:00 a.m. l
PRESENT WERE
Chairman Mrs. L. Hancey
Members M. J. Breen
E. V. Kolb
Dr. T. H. Leith
Mrs. S. Martin
Authority Member J. S. Scott
Authority Chairman R. G. Henderson
Authority Vice-Chairman Mrs. F. Gell
Acting Secretary-Treasurer W. A. McLean
Administrator - Finance Division A. D. Harris
mE FOLLOWING ITEMS WERE CONSIDERED:-
1) Salaries and Wages - 1980;
2) Resignation of Administrator, Finance Division;
3) Advertisment - Position - Administrator, Finance Division;
4) Appointment of Special Advisor (Kortright);
5) Appointment of Conservation Education Supervisor (Kortright);
6) Employee Benefits - Sickness Credits;
7) Appointments, transfers and/or promotions to the Full Time and Full Time
Probationary Staff;
8) Uniform and Safety Boot Policy;
9) Tuition Fees - Debra L. Mosher;
10) Responding to Telephone Messages;
IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS:-
1) SALARIES AND WAGES - 1980
THAT for the purpose of estimating the 1980 Preliminary Budget, an allowance of
11% on the Salary and Wage account be applied, and further
THAT the staff be directed to review the rates of economic and merit adjustments.
2) RESIGNATION OF ADMINISTRATOR, FINANCE DIVISION
THAT the resignation of the Administrator, Finance Division, Alan D. Harris, be
accepted with regret.
3) ADVERTISMENT - POSITION -
ADMINISTRATOR, FINANCE DIVISION
THAT the staff be authorized and directed to advertise immediately for applicants
for the position, Administrator, Finance Division.
4) APPOINTMENT OF SPECIAL ADVISOR (KORTRIGHT)
THAT Mr, K. W. Strasser be appointed Special Advisor assigned to the Kortright
Centre for Conservation, effective September I, 1979 at a salary as approved by
the Sub-Committee under date of August 8, 1979.
5) APPOINTMENT OF CONSERVATION I
EDUCATION SUPERVISOR (KORTRIGHT)
.'1
THAT the position title for the Conservation Education Supervisor on Page M-6 of the
Personnel Manual, be revised to read Conservation Education Supervisor (Field Centres),
and
B-281
Personnel Sub-Committee
Meeting 113/79 Page '2
5) APPOI~IENT OF CONSERVATION EDUCATION
SUPERVISOR (KORTRIGHT) (continued)
THAT a job description be prepared for the Conservation Education Supervisor
(Kortright) for submission to the Information & Education Advisory Board at its next
meeting, and further
THAT the staff be authorized and directed to advertise and fill the position of
Conservation Education Supervisor (Kortright).
6) EMPLOYEE BENEFITS - SICKNESS CREDITS
THAT the staff be directed to review the Authority policy having regard to Employee
Benefits - Sickness Credits as per Authority Resolution '53 including the financing
of the liability and report to the Executive Committee.
7) APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS
TO THE FULL TIME AND FULL TIME PROBATIONARY STAFF
THAT the following appointments, transfers and/or promotions be made to the Full
Time and Full Time Probationary Staff:-
a) Appointments to the Full Time Staff
Name Position Effective Date
L. Bryla Secretary 1979.07.22.
D. Smith Assistant Registrar 1979.06.24.
A. Wickens Co-Ordinator of Recreation Programs 1979.04.29.
J. MacKay Labourer 1979.04.30.
U. Volker Nursery Assistant 1979.04.30.
J. Tucker Development Technician 1979.05.06.
D. Fuller LabOurer 1979.04.01.
J. Haggart Clerk Typist 1979.05.27.
b) Appointments to the Full Time Probationary Staff
Name Position Effective Date
C. Piper Planning Technician 1979.05.22.
K. Snowden Biological Technician 1979.05.22.
M. Good Cleaner 1979.07.07.
R. Brooks Cleaner 1979.06.20.
N. Cowey Project Engineer 1979.03.26.
c) Promotions within the Full Time Staff
Name Position Effective Date
J. Giancola Senior Secretary 1979.04 .01.
W. Kerr Labourer 1979.05.13.
L. Cocking Stockroom Manager 1979.06.24.
M. Giffen Assistant Works Superintendent 1979.07.30.
d) Promotions within the Full Time Probationary Staff
Nallle Position Effecti ve Date
G. Kidd Superintendent 1979.06.24.
H. McIntosh Assistant Superintendent 1979.06.24.
R. Gilchrist Assistant Superintendent 1979.06.24.
M. Giffen Assistant Works Superintendent 1979.01.29.
8) UNIFORM AND SAFETY BOOT POLICY
THAT the revised Uniform and Safety Boot POlicy - Issue and Sale of Unifor:ms,
attached as Ap'pendix #1, be approved for inclusion in the Personnel Manual.
B-282
Personnel Sub-Committee
Meeting 1#3/79 Page '3
9) TUITION FEES - Debra L. Mosher
THAT Mrs. Debra L. Mosher be authorized to enroll in a Registered Industrial Account-
ant's Course and that the tuition fees for the first year in the amount of $400.00
be paid.
10) RESPONDING TO TELEPHONE MESSAGES
THAT the Secretary-Treasurer be requested to review the problem regarding the respond-
ing to telephone messages by the Development Control Staff and report to the
Executive Committee,
Mrs. L, Hancey, Chairman w. A. McLean, Acting Secretary-Treasurer
1979.08.08,
:wr
~
.
~ the metropolitan toronto and region conservation authority PAGE: D-l B-28
~ Personnel Manual EXEQJTIVE N!
Uniform and Safety Boot Policy DATE:
Issue and Sale of Uniform RESOlUTION ~
Unif6rms will be available to employees for their use while on
Authority duty on the recommendation of the Administrator of
the Division, for the initial issue and any subsequent issues.
1) Free Issue
For the purposes of this policy, Field Supervisory Staff
shall include Regional Superintendents, Superintendents,
Assistant Superintendents, Enforcement Officers and Safety
Officer, Dam Operators, Superintendents and Assistant and
Superintendent of Operations at the Black 'Creek Pioneer
Village, the Supervisor, Curator, and Special Advisor of
the Kortright Centre, and these categories will receive a
free issue of uniforms as follows:-
1 winter uniform consisting of: 1 blazer
2 pair pants
3 dress shirts
2 ties
1 summer uniform consisting of: 1 windbreaker) wash
2 pair pants) & wear
3 light shirts) material
1 nylon parka
1 raincoat (plastic)
I dress hat
1 "Tn :'Shirt
2) Half Price Issue
a) Supervisory Staff
Supervisory Staff, where their job function calls for a
uniform and is approved by the Administrator of the
Division, will be supplied the following items of clothing
at 50% cost. This classification will include the
categories of:- Supervisors and Assistant Supervisors
and Residential Assistants and Instructors of Field Centres,
Education Assistants, Gatemen (permanent), Registrar (Black
Creek Pioneer Village), Lead Hands, the Building Manager II
and Co-Ordindator of the Kortright Centre,.and the uniform
will consist of:-
1 summer uniform consisting of: I windbreaker ) wash
2 pair pants ) & wear
3 light shirts ) material
2 ties
1 nylon or work parka
1 plastic raincoat
3 "T" Shirts
B-284 c& the metropolitan toronto and region conservation authority PAGE: D-2
Personnel Manual EXEaITIVE N!
(p Uniform and Safety Boot Policy DATE:
Issue and Sale of Uniforms RESOWTION N!
b) General
1) The following issue will be supplied, on the
recommendation of the Administrator of each
Divison, to all employees who by the nature
of their jobs are required to wear uniforms
and are employed on an ongoing basis :._
3 pair work pants 2 shop coats
3 work shirts 1 winter cap
2 lightweight jackets 1 work parka
2 pair coveralls 3 nTn Shirts
2) The technical and administrative staff, where
required by their jobs to wear a uniform,
shall be able to purchase at half price the
following items:-
1 nylon or work parka 1 light jacket
1 pair work pants 1 pair coverC\l1s
1 work shirt 1 "Tn Shirt
3) Part Time staff and Seasonal staff will be able
to purchase at half price the following
items:-
2 work pants 1 lightweight jacket
3 work shirts 1 pair of coveralls
1 winter cap 3 nT" Shirts
1 work parka
4) Special programs for those employees in the
field, in Experience Programs for example,
will be allowed to purchase the following
items at half price:-
2 pair pants 1 light jacket
2 work shirts 3 "Tn Shirts
5) That a maxium of 2 summer caps per annum, be
available to all employees entitled to uniform
issue under this policy.
<& the metropolitan toronto and region conseNation authority PAGE: B-28~
D-3
Personnel Manual EXEaITlVE N!
(?7 Uniform and Safetv Boot Policy DATE:
Issue and Sale of Uniforms RESOlUTION N!
c) Safety Equipment
1) Footwear
a) The Authority shall contribute 50\ of the
cost to a maxium of $30.00 of one standard
and one winter pair of safety footwear per
employee requiring such equipment per annum,
and a contribution shall be pa1d after 3
months service with the Authority. This
contribution will be applicable for employees
working on an ongoing basis.
b) The Authority shall contribute to a maximum
of $10.00 of the cost of safety footwear for
other employees requiring such equipment at
the discretion of the Administrators.
2) Safety Equipment
Safety equipment will be supplied on the job as
re<;luired.
I
3) Replacement
Replacement and subsequent issues of all free or shared cos~
issues of clothing and footwear are conditional on the article
being no longer serviceable and the replacement is requisitioned
by the the appropriate Administrator. Additional articles of
clothing may be purchased by the employee at full cost, when
approved by the Administrator of the appropriate Division
M.nagemenl ConsulllnlS HIckling-JOhnston L.mllecl. B-286
.1S Yonge Slreel. SCHEDULE liB-
Toronto. Onl.roO MSB 6'E7
Telephone (.16) 366.2811
HlcklinGdohnston August 14, 1979
Mr. G. Henderson
Chairman
The Metropolitan Toronto & Region
Conservation Authority
S Shoreham Dr ive
Toronto, Ontario
Dear Sir:
We are pleased, following our meeting with your Executive Committee
on August 8, to herewith provide a study outline for the organiutional
review to be performed for the Authority. As such the outline will serve
to clarify the Terms of Reference agreed to at that meeting. ,
This outline addresses, in full, the process which we discussed at that meeting;
please note that this outline addresses definitively the first phase of the
study which w~ discussed, and provides a general outline of the process
which would apply for the second phase as it might be judged necessary
and appropriate. This, of course, is due to the fact that the second phase
details would be determined by the outcome of the first phase. In this
way we will ensure that funds are not expended unnecessarily on non-productive
mat(ers, and that the major part of the study is of the utmost possible
relevance.
We look forward to working with you and your colleagues and staff on
this important project.
Sincerely,
~
C. W. Birkett
Partner
. EDMONTON. TORONTO. OnAWA. MONTREAL ·
STUDY OUTLINE
*
ORCANIZA TIONAL REVIEW
*
THE METROPOLITAN TORONTO'" REGION
CONSERVATION AUTHORITY
*
August 14, 1979
HiCklinG-JOhnSton
TABLE OF CONTENTS
f!e
I INTRODUCTION 1
II OBJECTIVES OF THE STUDY 2
III STUDY METHODOLOGY 3
THE PROCESS 3
STUDY METHODOLOGY .
. Phase I .
. Phase II ,
IV TIMING. STAFFING AND COSTS 7
TIMING 7
STAFFING 7
COSTS 7
APPENDIX A - Resumes
HICKlIl1GtJOhnston
EXTERNAL
ENVIRONMENT
ST TEGY
INFORMATION &
DECISION-MAKING
SYSTEMS
HICkllnGdOhnSton
I.
I
INTRODUCnON
The maintenance of an effective organization is dependent upon the balance
between its key elements as shown on the facing pagej this maintenance
requires review and renewal in all organizations from time to time. In a
world where rapid change has become the 'watchword, periodic review of
organizations is virtually unavoidable. Changes of a dramatic nature have
occurred in the past decade - changes in our economy, changes in our
technologies, and changes in public attitudes and expectations. There is
every evidence that such change will continue at an accelerated pace and
this will impact upon the ability of organizations to continue to manage
effectively and efficiently. As well, the changes will impact on the
programs and services most organizations are able to offer the public.
I
The Metropolitan Toronto and Region Conservation Authority (M. T .R.C.A.)
was created by an Act of the Ontario Legislature which outlines a number of
responsibilities of the Authority and defines its constitution, authorities and
relationships. The major provisions of the Act have been, and wiU continue
to be, central to the operations of the Authority.
In the two decades since the Authority was created, it has experienced
significant growth in funds, in staff, and in programs. It has demonstrated
an ability to react effectively to public expectations and needs, and it has
carried through with its original and central mandate relative to flood
control and conservation in an exemplary fashion. It has grown to meet
demands and opportunities as they have arisen, and there are now questions
as to its organizational suitability for the present and the years ahead.
It is appropriate, given the nature of our changing times, that the Authority
step back and review its organization. its operations and its management
systems to ensure their continued effectiveness. and to assure itself of its
continuing ability to operate efficiently.
HIClClIl1G-JOhnStQn
2.
D
OBJECTIVES OF THE STUOY
The objectives of the study are as foUows:
1. To review the organization of the Authority, its divisions and
departments, including the roles and relationships of its key personnel.
2. To review current management mechanisms, inclusive of information
and decision-making mechanisms and manpower planning/staffing
systems.
3. To make recommendations, as' appropriate, for revisions to, or
reorganization of the Authority,ls structure and systems for
management. I
4. To make ancillary recommendations for amendments to support
systems to improve their effectiveness and their relevance to the
emerging organization.
HiCklinG-JOhnston
3.
m
STUDY METHODOLOGY
THE PROCESS
Hickling-Johnston Limited professionals have extensive experience in the
conduct of organizational reviews such as the one being considered by the
Authority, and in the development of revised structures and systems for
organizations. We are proud of our recognized ability to ensure that
effective change occurs and persists as appropriate in the organizations to
which we consult. We attribute our unusually high "success rate" to the
process upon which we base our consulting activity; this process involves,
amongst other things, the development of a working Steering Committee
from within the client organization, and careful management of the
Committee/consultant interface using the latest technologies in group.
decision making.
In this case, the Steering Committee must be representative of the major
components of the organization, both Board and Staff, and must be credible
to the Board if its final recommendations are to be implemented. Members
of the Committee can expect to be deeply involved in the study process,
with their major responsibilities being:
. to ensure that the consultants conduct the study in the agreed manner;
. to guide the consultants where necessary in identification of
appropriate revisions or additions to the study plan;
. to participate actively in making decisions relative to final
recommendations;
. to act as an interpreter of the recommendations where required to the
Authority after the study is compieted and to gain commitment to
implementation of the final recommendati~ns adopted.
Our experience indicates that the combined Study Team/Steering
Committee approach provides the expertise and objectivity of the "outsider"
in combination with the experience and understanding of people active in
the client organization - this combination results in meaningful and
impJementabie recommendations. The ideal number of members 01 the
HICk:llnGdOt1ns1on
If.
Steering Committee is seven to eight; where necessary, and as your
committee has suggested, the Committee may consist of two moduJes of
this number.
The Steering Committee can, during the course of the study, expect to
review papers repared by the consultants and participate in such meetings as
are indicated in the timetable for the study. As well, Committee members
can expect to participate in the making of decisions pertinent to the
conduct of the study and finaJ recommendations to the Board.
STUDY METHODOLOGY
The study will be conducted in two Phases, each Phase having three distinct
stages.
Phase I
The objective of this phase of the study is, in a totally detached and
'objective manner, to determine the major issues facing the Authority and to
recommend to the Steering Committee what further detailed study, if any,
is required by the consultants and the Steering Committee itself.
Stage 1 - Problem Diagnosis
In this stage, the consultants wiJJ review available data and information
relative to the objectives, programs, operations and systems within the
Authority. This data will be gathered in two ways - by review of existing
documentation and by interview of key personnel. We anticipate that
approximately twenty to twenty-five people, including representatives of
the Board and senior staff, together with key external people in Government
will be interviewed. The objective of these confidential and detailed
interviews is to identify tile perceptions regarding issues and opportunities
held by those interviewed. '
Stage 2 - Problem Synthesis
Armed with the information and data gathered in Stage I, the consultants
wilJ develop a review of the problems and opportunities identified, perform
an analysis to propose the rationale behind these perceptions, and identify
requirements for further detailed review as deemed appropriate.
HICI<lInGJOhnSton
,.
Stage :5 - Steering Committee Report
The consultants will then prepare a full working paper to serve as an agenda
for the first full meeting of the Steering Committee. The p~per wiJI contain
the conclusions and recommendations of the consultants ,with respect to
Phase II and will be the subject of a full day discussion by the Steering
Committee. It is at this meeting that the Committ~e will make decisions
with respect to how to proceed to Phase II.
We would stress that, at this point in time, the Steering Committee has the
option of proceeding to Phase II or of containing the study at this juncture;
the latter decisions would presumably be based on the decision of the
Committee that no further involvement . of consultants is required.
However, it should be made clear that specific recommendations with
respect to the resolution of problems that are identified will not be
available at this poirU.
Phase II
This phase represents the major and detailed organizational realignment
study, flowing from the directional guidelines of Phase I. This Phase would
consist of the foJlowing three stages.
Stage 1 - Detailed Problem Definition
The specific areas to be investigated, as determined in Phase I would be
further reviewed. The Study Team, wiU proceed, having added to itself
appropriately skiUed personnel, to a detailed review of data relative to
these areas. This will involve deeper probing of available information and
interviewing of a number of additional personnel in order to fuJly understand
organization roles, relationships, information and other support systems and
manpower systems. Particular attention wUI likely be paid to staffing,
costing and communication ,systems.
Stage 2 - Analysis
The Study Team will then perform the organizational analysis required to.
define appropriate options available to achieve improvement as deemed
necessary. This analysis and option definition will be the subject of a second
working paper which will serve as the agenda for a second meeting of the
Steering Committee. In this forum, decisions will be made with respect to
the best available options for structure, systems or operations.
HlCkllnGdOhnSton
6.
Stage 3 - Recommendations
Given the input of the Steering Committee from the previous Stage, the
consultants would proceed to develop detailed recommendations, incJusive
of a plan for implementation of the options chosen. This wouJd provide a
draft report for review by the Steering <;:ommittee; a finaJ fuJJ day meeting
would be held with the Steering Committee.
This review would constitute the subject of a final Steering Committee
meeting, the purpose of which would be to gain consensus of final
recommendations and an implementation plan,to be presented. to the Board.
HiCklinG-JOhnston
_nON ""~ "",,,,1IIlI IT". 1nII1l!IITfl . '"-IIlII mwSERYATlON AUTIIllRITT
- ORGANIZATIONAL REYIElI
~D WEEKS
-M:IlVInU I , I. .. I. l,n I" u 1& II. I,n " I,. I,. ,.
PHASE I
Stage 1- Problm Diagnosis ~ -
Stage 2- ProbleD1 Synthesis -
Stage 3- Report "-- --
!!!m..!!
5tallll I-Detat1ed ProIlI.
Definition
Stallll 2-An.llys Is
StqI 3-Rec:_ncIatlons - - --
ICFf EVENTS
IIlIrktllll 'aper . .
Steerfllll c:.afttee Iftg. .
I
I I
HICk:lfnGdOhnston - "'Dun IIUAOIIIINT
7.
IV
TIMING, STAFFING AND COSTS
TIMING
We estimate that an elapsed time of approximately five to six weeks would
be required to completion of Phase I as proposed. Completion of Phase II is
more difficult to estimate in terms of the time required, but our experience
would lead us to suggest that this would require an elapsed time of 12 -16
weeks. The attached schedule sets out the project milestones.
Assuming approval by August 24, we anticipate being able to begin during
the first week in September.
STAFFING
The nature of Phase I requires that it be conducted by senior and
experienced professionals. We, therefore, propose that Phase I be conducted
by Dr. C.W. Birkett and Mr. P.J. Irvine. Resumes for each are appended.
Phase II would require the involvement of more disciplines from our
professional staff, yet it is difficult to determine which professionals are
most appropriate prior to the completion of Phase I.
We would propose that Phase II would be under the overall direction of
Messrs. Birkett and Irvine and that staff would be drawn from the firm as
required to appropriately. support consulting in organization, systems,
. personnel, and finance.
COSTS
We estimate. Phase I will cost $9,000 - $11,000 for professional fees.
Expenses will be additional and will be billed to you at our cost. They should
not exceed $1,000.
HICI<lInGJOhnSton
I.
Phase II could be conducted within a maximum budget 01 $'0,000 for
professional fees and $2,000 for direct expenses inclusive of consultant
travel, computer time, report preparation and reproduction, etc. With the
presently available information, we foreiee that this ph~se will involve
realignments to organization, and to individual responsibilities and
accountabili ties, plus perhaps adjustments to staffing levels.
Concomitantly, it will involve recommended adjustments to paperwork and
computer support systems, to align the system with tbe emerging
organization and improve communications and reaction time. We do not
foresee, nor have we included any budget for, revised compensation systems,
the specification and selection of new computer hardware, or the design of
software systems. In the unlikely event that these are necessary, a third
phase might be necessary. Given this understanding, it is our view that,
dependent upon the directions determined for Phase II in the first Phase, the
project costs for Phase II could be less than proposed; they are unlikely to
be more.
HCkllna.Jonnston
APPENDIX A
.
RESUMES
HiCklinG-JOhnston
@
HicklinG-Johnston CHARLES W. BIRKETT
'..............nl CIMhUll,anl..
Dr. Birkett is a Partner with Hickling-Johnston Limited whose chief
Interest is in the development and management 'of new administrative
approaches to the provision of social ser~ices with particular
emphasis in the total field of health. His competence covers the
analysis of organization patterns and the developments of systems
and structures to bring about change in complex sysems. He is
particularly interested in dealing with the issues of professionalism
and professional relationships in the social services sector.
Prior to joining Hickling-Johns,ton Limited. Dr. Birkett had extensive
experience in both private and' hospital emergency medical practice.
As well. he has served as Medical Director of the Winthrop
Laboratories Division of Sterling Drug and later as Vice-President of
the same firm. Additionally. he has served as a CouncilJor for the
Township of Vaughan. as a member of the Planning Board of the same
Municipality. and as a Director for the Mental Retardation facility in
Richmond Hill.
Currently. Dr. Birkett. in addition to his position as a Partner with
Hickling-Johnston Limited. is co-owner and Presid,ent of Marshview
Holdings Ltd.. co-owner and Director of a small plastics manufactur-
Ing firm. and a Director of Jerram Pharmaceuticals Ltd.
Dr. Birkett graduated from the Faculty of Medicine. University of
Toronto in 19S9. and in 1972 obtained his Master of Business
Administration from York University. with emphasis in Public
Administration and the behav40ural approach to problem-solving.
Since joIning Hickling-Johnston Limited. Dr. Birkett has been
Involved in a number of projects including:
. the planning of new organizationa,1 patterns. both teaching and
non-teaching hospitals;
. the assessment of current organization and funding of medical
educatIon;
. development of information systems for community health
centres;
. assessment of organizational effectiveness for municipalities
Inclusive of a review of services such as Homes for the Aged;
. role studies for both teaching and community hospitals;
@
HicklinG-Johnston . an assessment of a regional mental health facility in Nova
't.an.a..-mrnl (nn..ullolnl\ Scotia;
. an assessment of non-institutional health care opportunities for
a religious congregation;
. an assessment of he~th service opportunities for a major
voluntary, non-profit organization;
. development of a paper for the Government of Ontario relative
to the long-term roJe of public education in health care;
. design and management of a series of conferences on the
Canadian health care system for the American Medical Associa-
tion; .
. re-organization of the Deanery of a major Canadian medical
faculty;
. assessment of a university Family Practice Department;
. review of emergency service at an acute treatment general
hospital. ..
8 PETER. J. IRVINE
HicklinG-Johnston
~Nlemen. Con",h.nl'
Peter Irvine is a partner with Hickling-Johnston Limited. He
specializes in general managerial matters, such as strategic planning,
operational analysis, reorganization, turnar.ound and interim line
management, and a11 aspects of expansion and diversification. He
heads Hickling-Johnston's practice in the field of mergers, acquisi-
tions, and divestitures. He has served as chief executive officer of a
number of companies in Canada and the U.S., and his focus is on
results oriented bottom line consulting.
Recently he has completed assignments involving the internal
r.eorganiza tion and diversification of a leading health services
company; the reorganization and relocation of a major appliances
multinational; the turnaround management of a financially troubled
leather goods manufacturer; the evaluation for sale of a wood
products manufacturer; the submission of a public offering for all of
the outstanding shares of Canada's leading computer services compa-
nYi and the reorganization of a $100 miUion U.S. food subsidiary of
one of Canada's largest companies.
His background includes early experience in marketing, manufac-
turing and engineering management. In his consulting career, clients
have often asked him to "take over" for them during periods of
change. Positions he has held are:
. Corporate Planning Manager (building materials)
. Assistant General Manager (communications machine-
ry)
. General Manager (concrete products)
. Executive Vice President (industrial equipment)
. Executive Vice President (fiberglass)
. President (apparel)
. Chairman (leather goods)
. Chairman (recreational vehicles).
He is the author of a series of articles on acquisition for Executive
Magazine, and is a contributing business writer for the Financial Post.
He holds a Bachelors degree in Industrial Engineering and a Masters
degree in Business Administration from the University of Toronto.
He bas an Honorarium from York University for lecturing in
corporation finance and administrative policy. He is a member of the
Association of Professional Engineers of Ontario, serves on the
Council of the Institute of Management Consultants of Ontario, and is
President of Kimbermount Consultants Limited.
B-287
SCHEDULE .C.
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
REPORT '3/79
of the
TENDER OPENING SUB-COMMITTEE
The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive,
Downsview on Wednesday, July 25, 1979, commencing at 9.30 a.m., to consider
tenders for the proposed Erosion Control Work at 35 Canyon Avenue, City of
North York, Don River Watershed.
PRESENT WERE:
Chairman R. G. HendeJ::son
Vice-Chairman Mrs. F. Gell
Chairman, Flood Control & J. S. Scott
Water Conservation
Advisory Board
Chairman, Don valley Mrs. L. Hancey
Advisory Board
Chisholm, Fleming & Assoc. T. Rohacek
Staff
Secretary-Treasurer K. G. Higgs
Head, Flood Control Section J. C. Mather
Operations & Maintenance R. W. Dewell
Supervisor, Flood Control
Section
The Committee was advised that twenty-two sets of documents were taken out by
contractors and seven tenders received, as follows:
CONTRACTOR TOTAL TENDER
Cucci Construction Limited $174,670.00
Alcan-Colony Limited 132,421. 20
Disher-Farrand Limited 192,345.00
Bruce S. Evans Limited 232,497.00
Loy Savina Limited 226,797.00
Gazzola Construction Limited 131,201.85
Evans Contracting Limited l63,625.00
IT WAS AGREED, AND THE COMMITTEE RECOMMENDS THAT: All tenders received for
the proposed Erosion Control Work at 35 Canyon Avenue, City of North York,
Don River WaterShed, be referred to the Consultants, Chisholm, Fleming arid
Associates, for their review and report, with recommendations to the
Executive Committee Meeting to be held on Wednesday, September 5, 1979.
R. G. Henderson K. G. Higgs
Chairman Secretary-Treasurer
1979.08.09
JCM/fn
~ B-288
,
.
the metropolitan toronto and region conservation authority
minutes Report 113/79
EXECUTIVE COMMITTEE WEDNESDAY-SEPTEMBER-5-l979 113/79
The Executive Committee met at the Authority Office, 5 Shoreham'Drive, Downsview, on
Wednesday, August 15, 1979, commencing at 10:00 a.m.
RE: HEARING - Mr. Sheldon Harris
Town of Caledon
Humber River Watershed
Mr. J.W. Maletich, Development Co-ordinator, advised the members that neither Mr.
Sheldon Harris nor his representative was present for the Hearing. In connection
with Section 27 (2a) of The Conservation Authorities Act, a Notice of Hearinq had
been sent, by registered mail, to Mr. Harris. The notice advised the applicant that
if he did not attend the Hearing, the Executive Committee of The Metropolitan
Toronto and Region Conservation Authority may proceed in his absence and he would
not be entitled to any further notice in the proceedings.
Res. '349 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Hearing, under Section 27 (2a) of The Conservation Authorities
Act, in respect of Mr. Sheldon Harris, Town of Caledon, Humber River Watershed,
scheduled to be held Wednesday, September 5, 1979, be deferred sine die.
CAJUUED,
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Members M.W.H. Biggar
M.J. Breen
E.B. Card
(For Mrs. J.A. GariIner) R. Fitzpatrick
Mrs. L. Hancey
C.P. Kline
Dr. T.B. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.E. COOper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Research Planner, Planning & Policy Mrs. A.C. Deans
Development Co-~rdinator, Planning & Policy J . W. Maletich
Supervisor, Property Administration, P&AD D.J. Prince
ABSENT WERE
Vice Chairman Mrs. F. Gell
Members Mrs. J. A. Gardner
E.V. Kolb
MINUTES
The Minutes of Meeting 112/79 were presented.
Res. 11350 Moved by: C.F. Kline
Seconded by: E.B. Card
RESOLVED THAT: The Minutes of Meeting 112/79, as presented, be adopted as i.f read.
CARRIED,
B-289 -2-
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY.
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
1. REPORT #4/79 - PERSONNEL
SUB-COMMITTEE
Mrs. Hancey presented Report #4/79 of the Personnel Sub-Committee.
Res. #351 Moved by: Mrs. L. Hancey
Seconded by: MrS. S. Mitrtin
RESOLVED THAT: Report #4/79 of the Personnel Sub-Committee be received,
approved and appended as Schedule nAn of these Minutes.
CARRIED;
2. STREAM CONSERVATION SYMPOSIUM, TRENTON, ONT.,
SEPTEMBER 7-9, 1979
-Attendance at
A staff communication was presented advising that the above symposium will
include workshops on the use of natural materials for stabilizing stream banks,
providing in stream fish cover and enhancing the spawning beds for natural trout
populations. These subjects will have direct application to the Authority's
erosion control and stream enhancement programme.
Res. #352 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: Mr. Gary Wilkins, Field Supervisor, Conservation Land Management
Division, be authorized to attend the Stream Conservation symposium, to be held
in Trenton, Ontario september 7-9, 1979, and that his related expenses, in the
estimated amount of $120.00, be paid.
CARRIED;
3. REGISTERED INDUSTRIAL ACCOUNTANT'S COURSE
-Request for Assistance, Mrs. D.L. Mosher:
Increase in Fees
A staff communication was presented advising that Report 13/79 of the
Personnel Sub-Committee recommended to Executive Committee Meeting 112/79
approval of enrollment by Mrs. D.L. Mosher in a Registered Industrial Account-
ant's course and payment of the first year's tuition fees in the amount of
$400.00. The amount of the tuition fee has recently been increased to $480.00.
Res. #353 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The amount of $80.00, representing an increase in the $400.00
first year tuition fee for enrollment of Mrs. D.L. Mosher in a Registered
Industrial Accountant's course - as approved at Executive Committee Meeting
,l2/79 - be paid.
CARRIED;
4. BLACK CREEK PIONEER VILLAGE
-Inclusion in 1980 Exxon Travel Club
Discount Coupon Booklet
A staff communication was presented advising that the Black Creek pioneer
Village has been selected as one of about twenty attractions in Canada to
participate in the Exxon Travel Club coupon booklet.
Res. #354 Moved,by: M.W.H. Biggar
Seconded by: M.J. Breen
RESOLVED THAT: Black Creek Pioneer Village be included in the 1980 ~on Travel
Club discount booklet for the year 1980, and the discount on the fanlily
-3- B-290
pntrance fee be $200 (a reduction from $7.00 to $5.00), and the senior citizen
fee be 50C (a reduction from $1.59 to $1.00).
CARRIED,
5. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Kitchen Equipment - Utensils
A staff communication was presented advising that the following quotations have
been received for the supply and delivery of small kitchen equipment for Lake
S't. George Conservation Field Centre:
J & F Distributors $1,594.29
Superior Restaurant &
Hotel Supplies $1,687.10
Dinetz Restaurant Equipment $1,847.70
Res. 1355 Moved by: J.S. Scott
Seconded by: Dx:. T.H. Leith
RESOLVED THAT: The quotation received from J & F Distributors for the' supply
and delivery of small kitchen equipment for the Lake St. George Conservation
Field Centre, in the amount of $1,594.29, be accepted; it being the lowest
quotation received.
CAlUUED,
6. HURRICANE HAZEL 25TH ANNIVERSARY
-Programme Planning Committee:
Appointment of
A communication was presented advising that included in the 1979 Community and
Staff Relations Programme, adopted by the Executive Committee at Meeting .3/79
(Report 11/79 of the Information & Education Advisory Board) was a recommend-
ation that a programme be organized to highlight the 25th Anniversary of
Hurricane Hazel.
Res. 1356 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card .
RESOLVED THAT: A Hurricane Hazel 25th Anniversary Planning Committee be
established, and that Mr. John Downing, Dr. T.H. Leith, Mr. Jack Dunlop and Mr.
J.S. Scott be asked to serve on the committee.
~ED,
7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. F. Zerucelli
To relocate existing watercourse, being a tributary of
the Humber River in the vicinity of Lake Wilcox, Town
of Richmond Hill
A staff communication was presented advising that an application has been
received from Mr. Frank Zerucelli for permission to relocate an existing water-
course and, subsequently, to place the fill material on the abutting property
at the above location.
Res. 1357 Moved by: E.H. Card
Seconded by: . C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Mr. F.
Zerucelli, be received; and
THAT the application of Mr. F. Zerucelli for permission to relocate an exist-
ing watercourse, being a tributary of the Humber River, in the vicinity of
Lake Wilcox, Town of Richmond Hill, be approved, subject to: .
(a) The proposed drainage diversion being in accordance with Drawing .7913-1,
dated July, 1979, as prepared by Parhet Engineering Limited;
(b) Approval to intersect with the new channel being received from the Town of
Richmond Hill Engineering Department;
(c) The fill from the new channel and watercourse diversion being placed only
in that area as defined by Scheme 'B', as shown in red on the plan
prepared by Crysler & Lathem Limited,
B-291 -4-
(d) Every effort being made to minimize siltation of the river during
construction;
( e) All work being completed to the satisfaction of the Authority and of the
T~wn of Richmond Hill Engineering Department. CARRIED,
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Borough of Etobicoke Parks & Recreation Department
To place fill in the area of the Mimico Creek known as
West Deane Park, located on the west side of Martin
Grove Road, north of Rathburn Road
A staff communication was presented advising that an application has been
received from the Parks & Recreation Department of the Borough of Etobicoke for
permission to place approximately 5,lOO cu. yds. of clean fill at the above
loca tion .
Res. #358 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with .the application of the
Borough of Etobicoke Parks & Recreation Department, be received, and
THAT the application of the Borough of Etobicoke Parks & Recreation Department
for permiSSion to place fill in the area of the Mimico Creek known as West
Deane Park, located on the west side of Martin Grove Road, north of Rathburn
Road, be approved, subject to:
.All fill being placed in accordance with the plan Drawing '658-28-~Ol
Grid Location lE 14-2, dated June, 1979, as submitted by the Borough
of Etobicoke, Parks and Recreation Services Department.
CARRIED;
9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Delzor Investments Limited
To realign 150 linear feet of existing West Branch of
Salt Creek, City of Brampton (.Humber River Watershed)
A staff communication was presented advising that an application has been
received from Delzor Investments Limited for permission to realign a portion
of the Salt Creek in conjunction with a proposed 84-acre residential develop-
ment at the north-east corner of the Seventh Line and '15 Sideroad, City of
Brampton.
Res. #359 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Delzor
Investments Limited, be received; and
THAT the application of Delzor Investments Limited for permission to realign
the Salt Creek on the West Half of Lot 16, Concession VIII, City of Brampton,
Humber River watershed, be approved, subj ect to:
(a) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(b) Every effort being made to minimize silting of the watercourse during
construction;
(c) All work being carried out in accordance with Drawing 112, prepared by
the Kleinfeldt Group and dated June, 1979.
CARRIED,
10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Baif Associates
To construct a storm sewer outfall south of Weldrick Road
and east of Bathurst Street, Town of Richmond Hill
(Little Don River Watershed)
A staff communication. was presented advising that an application has been
received from Baif Associates' for permission to construct a storm sewer out-
fall, including a concrete endwall, gabion-lined swale and temporary silt trap,
at the above location.
-5- B-292
.' .
Res. #360 Moved by: E,n. Card
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Baif
Associates, be received; and
THA'l' the application of Baif Associates for a permi t to construct a storm
sewer' outfall on Registered Block 'Q', Registered plan M-1590, Town of Richmond
nill (Little Don River watershed), be approved, subject to:
(a) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(b) Every effort being made to minimize silting of the,watercourse during
construction;
(c) All work being carried out in accordance with Drawing #9, as prepared
,by Marshall, Macklin, Monaghan Limited and d~ted May, 1979.
CARRIED;
11. ,APPLICA'rrON FOR PERMIT UNDER ONTARIO REGULATION 735/73
Hungry Lion Restaurant Limited
To construct a 'drive-in-drive-through' fast oil change
and lubrication centre on the north side of Dundas Street,
west of the Etobicoke Creek, City of Mississauga
A staff communication was presented advising that an application has been
received from Hungry Lion Restaurant Limited for permission to construct a
building and parking area at the above location.
Res. #361 Moved by: E.n. Card
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, togethe~ with the application of
Hungry Lion Restaurant Limited, be received; and
THAT the application of Hungry Lion Restaurant Limited for permission to con-
struct a ~rive-in-drive-through' fast oil change and lubrication centre on
Part of Lot 'A', Concession 1, N.D.S., Etobicoke Creek watershed, City of
Mississauge, be approved, subject to:
(a) All work being carried out in accordance with Drawing A-l, prepared by
T.A. Eldridge and Associates, Consulting Engineers, and dated June, 1979;
(b) All disturbed areas being restored to the satisfaction of the Authorityi.
(c) Every effort being taken to avoid siltation discharge to the Etobicoke
Creek .
CARRIED;
12. APPLICA~ION FOR PERMIT UNDER ONTARIO REGULATION 735/73
L. & S. Ypelaar
To construct a storage shed on Lot 4, Concession 4,
City of ~ississauga (Etobicoke Creek Watershed)
A staff co~nunication was presented 'advising that an application has been
received from Luke and Sandrea Ypelaar for permission to construct a storage
building (an addition to an existing service shop) at the above location~
Res. #362 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED TIIA'l': The staff conununication, together with the application of L. .&
S. ypelaar, be received; and
. THAT the application of Luke and Sandra Ypelaar for permission to construct a
storage shed within an area regulated by the Authority and defined on the
Flood LiJ;le l-1ap Shee.t #5 'of the Etobicoke Creek as Lot 4, Concession 4, City of
Mississauga, be approved, subject to:
. .
(a) No fill of any kind being plac~d over the top of the bank;
(b) The applicant complyi.ng with the desi.gn as shown on Drnwing
fll, P.ro~ect #7935, dated July, 1979, as prepared by Ni.\strodicnsa
Engineering Limited; . :
.
B-293 -6-
(c) The applicant complying with all existing municipal by-laws and
regulations.
CARRIED;
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Markham
To place fill in an area of the Don River adjacent to
and on the northerly road allowance of John Street
A staff communication was presented advising that an application has been
received from the Town of Markham for permission to place fill at the above
location.
Res. #363 Moved by: E.H. Card.
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of the
Corporation of the Town of Markham, be received; and
THAT the application of the Corporation of the Town of.Markham for permission
to place fill within an area regulated and defined in the Schedules to Ontario
Regulation 735/73 as being Sheet #16 of the Don River Watershed (Town of
Markham), be approved, subject to:
(a) All construction taking place in accordance with Drawing '1, File
No. 457-11-Al-00469, dated May 1979, as prepared by Gore & Storrie
Limited, consulting Engineers;
(b) Every effort being made to minimize silting of the Don River during
construction;
(c) All work being completed to the satisfaction of the Authority and of
the Town of Markham Engineering Department.
CARRIED;
14. WATERFRONT PROJECT 1977-1981, ~CARBOROUGH SECTOR
-Property: Terence Bell
Res. #364 Moved by: M.J. Breen
Seconded by: R. Fitzpatrick
RESOLVED THAT: The Report (August 21, 1979) set forth herein, received from the
Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED;
liRe: Project: Waterfront Project 1977-l98l
Scarborough Sector
Authority: Executive Resolution No.460, Meeting No.23 - January
21, 1976 and Authority Resolution No. 46, Meeting
No.3 - April 9, 1976
Subject Property: II Dault Road
Owner: Terence Be 11
Area to be Acquired: 0.142 acres, more or less
Recommended
Purchase Price: $5,000.00, plus Vendor's legal costs
"Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being Part of Blocks 'A' and ' B ' , Registered Plan 1228
and Part of Block 'D' and Part of I-foot Reserve, Registered Plan 1538, Borough
of Scarborough, The Municipality of Metropolitan Toronto, located south of
Dault Road, west of Lakeside Avenue.
"Negotiations have been conducted with the owner and, subject to the approval
of your Committee, agreement has been reached with respect to a purchase price,
as follows:
The purchase price is to be $5,000.00, plus Vendor's legal costs,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
.
-7- B-294
disbursements, are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed th~s proposed
acquisition and is in concurrence with my recommendation.
nFunds are available.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate."
.
15. REPORT 12/79 - FLOOD CONTROL AND
WATER CONSERVATION ADVISORY BOARD
Report 12/79 of the Flood Control and Water Conservation A~visory Board was
presented.
Res. '365 Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: Report 12/79 of the Flood Control and Water Conservation
Advisory Board be received; and
THAT Recommendations 11 and 12, as set forth herein, be adopted:
tl The 1980 Budget Estimates for the Flood Control Section, Water Resource
Division, as appended as Schedule "A" of the Minutes of Meeting '2/79
of the Flood Control and Water Conservation Advisory Board, be included
in the 1980 Preliminary Budget Estimates of the AuthoritYJ
'2 The staff be directed to prepare a brief outlining the construction
details and cost breakdown for Channel Improvements on the East Branch
of the Humber River in the conununity of Oak Ridges, Town of Richmond Bill.
for the approval of The Metropolitan Toronto and Region Conservation
Authority, The Regional Municipality of York and the Ministry of Batural
Resources.
CARUEQ
16. ENHANCED TRIBUTARY MONITORING PROGRAM -
MINISTRY OF THE ENVIRONMENT
-Authority participation
A staff communication was presented advising that the Ontario Ministry of ~e
Environment has asked The Metropolitan Toronto and Region Conservation
Authority for ~taff support to assist in monitoring the mouths of the Don and
Humber Rivers.
Res. 1366 Moved by: M.W.H. Biggar
Seconded by: M.J. Breen
RESOLVED THAT: The staff of The Metropolitan Toronto and Region Conservation
Authority be directed to assist the Ontario Ministry of the Environment in
tile "Enhanced Tributary Monitoring program" of the Don and Humber Rivers.
CARRIEDI
17. S'l'ORM WATER MANAGEMENT COURSE, UNIVERSITY
OF OTTAWA, OCTOBER l6-l8, 1979
-Attendance at
A staff communication was presented advising that the short course being held
at tile University of Ottawa is intended for the practitioner working witil
municipalities, consultants and developers, and will review the state of the
art of runoff control and the use of simplified and sophisticated design
methods .
Res. 1367 Moved by: C. F. Kline
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Messrs. J.C. Mather and M.R. Garrett be authorized to attend a
~urse on Storm Water Management, to be held at the University of Ottawa from
Cctober l6-l8, 1979 J and
~AT their total ex~enses in the estimated amount of $700.00 be paid.
CARRIED
,..l'~_...
8-295 -. . -8- 0..
"
_:) :.1, ,I ' , " . " ,
18. NATIONAL CONFERENC~-ON 'URBAN 'EROSION
&: SEo.IMENT CONTROL, ST. PAUL, MINNESOTA,
OCToBER'lO-12,1979'
-Attendance at .,
A staff~'COllUl\unidation was presented' advising that the above-noted conference,
co-hosted by the Minnesota and Wisconsin Boards of Soil and Water Conservatio~
inclydes the following:
.the technology of controlling or managing soil erosion, sediment movement
an~ ~~n~off on lands being disturbed for development;
.working arrangements involving local governments, conservation districts,
developers, builders and consultants in eros!on and sediment control
programmes;
.lega~,institutions, state and local statutes and ordinances for imposing
erosion, sediment and run-off controls.
Res. #368 Moved by: Mrs. S. Martin
Seconded by: E.H. Card
RESOLVED THAT: Mr. A.G. Sahabandu be authorized to attend the National
'Conference on Urban Erosion and Sediment Control in St. Paul, Minnesota, from
October 10-12, 1979, and that his expenses in connection therewith, in the
estimated amount of $550.00, be paid.
CARRIED;
19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-pruposed Slope Modifications: Rear of Nos.l97-20S Sweeney
Drive, City of North York (Don River Watershed)
A staff report was presented having regard to remedial work requir~d at the
abowe location.
Res._#369 Moved by: J.S. Scott
Seconded by: R. Fitzpatrick
RESOLVED THAT: Remedial work be carried out at the rear of Nos.197-205 Sweeney
Drive in the City of North York, Don River watershed, at an estimated cost of
$25,000.00; and
THAT the staff be authorized to retain the firm of Acres Consulting Services
Limited to provide geotechnical expertise during construction, at an estirnat~d
cost of $6,500.00;
AND FURTHER THAT the Ministry of Natural Resources be requested to approve
this work.
CARRIED;
20. INTERIM WATER & RELATED LAND, MANAGEMENT PROJECT 1979-1981
-Slope Stabilization: Nos.16-l8 Fernwood Gardens, Borough
of East York (Don River Watershed)
Engineering Services - Conceptual and Final Design
A staff report was presented advising that as outlined in the report "Erosion
Control and Bank Stabilization in Metr,opolitan Toronto - 1979 Programme",
which was approved by the Executive Committee at Meeting #15/78, remedial work
is proposed to be carried out at the above location.
Res. #370 Moved by: C.F. Kline
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates,
consulting Geotechnical Engineers, to provide conceptual and final design
engineering services for slope stabilization at Nos.16-l8 Fernwood Gardens,
Borough of East York (Don River watershed), at a cost estimated to be
$4,750.00.
CARRIED;
-9- B-296
21. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Slope Stabilization: Nos. 10-14 Bruce Farm Drive, City
of North York (Don River Watershed)
Engineering Services - Conceptual and Final Design
A staff report was presented advising that as outlined in the report nErosion
Control and Bank Stabilization in Metropolitan Toronto - 1979 programme",
which was approved by the Executive Committee at Me~ting '15/78, remedial work
is proposed to be carried out at the above location.
Res. t371 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates,
Consulting Geotechnical Engineers, to provide conceptual and final design
engineering services for slope stabilization at Nos. 10-14 Bruce Farm Drive,
City of North York (Don River watershed), at a cost estimated to be $4,750.00.
CARRIED,
22. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-proposed Erosion Control Work: No.35 Canyon Avenue, City
of North York (Don River Watershed)
Owner Participation -and- Design APproval
A staff communication was presented having regard to proposed erosion control
work at the above location. At meeting '6/79 of the Executive committee, the
following resolution was adopted:
nThe design for the proposed erosion control work at No.35 Canyon
Avenue in the City of North York, Don River Watershed, be approved, and
THAT the benefiting property owner, Mike Gold Construction Limited, be
required to pay $9,000.00 and convey approximately 2.3 acres of land, as
a prerequisite to carrying out remedial work."
It is proposed to amend the original resolution due to problems associated
with the conveyance of the 2.3 acre parcel of land.
Res. 1372 Moved by: J.S. Scott
Seconded by: Mrs. S. Martin
RESOLVED THAT: The design for the proposed erosion control work at 135 Canyon
Avenue, City of North York (Don River watershed), be approvedi and
THAT the benefiting property owner, Mike Gold Construction Limited, be
required to pay $9,000.00, and to provide a permanent easement over
approximately 2.3 acres of land, as a prerequisite to carrying out remedial
work.
CARRIED,
23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-proposed Erosion Control Work: No.35 Canyon Avenue, City
of North York (Don River Watershed)
Contract Award -and- Engineering Services
At Meeting #12/79 of the Executive Committee, Report '3/79 of the Tender
Opening Sub-Committee, having regard to the above proposed work, was
considered. It was resolved that tenders received be referred to the
consultant for review and report, with recommendations, to Executive committee
Meeting 113/'79.
The consultant's report and summary of tenders was presented.
Res. t373 Moved by: Mrs. S. Martin
Seconded by: E.H. Card
RESOLVED THAT: The firm of G~zzola Paving Limited be awarded the contract to
undertake the proposed erosion control work at No.35 Canyon Avenue, City of
North York (Don Rive4 watershed), at a cost of $131,201.85, as recommended
by Chisholm, Fl~ing and Associates, Consulting Engineersi and
THAT the firm of Chisholm, Fleming and Associates be retained to provide the
necessary engineering services during construction of the proposed erosion
B-297 -10-
control work at No. 35 Canyon Avenue (Don River watershed), at an estimated
cost of $19,800.00, as per their proposal dated April 27, 1979,
AND FURTHER THAT the Ministry of Natural Resources be requested to approve
thi s work.
CARRIED,
.14. MRS. HILDA HULL COLLECTION
A staff communication was presented advising th.at the Authority has been
offered the opportunity to purchase a portion of the'above-noted important
collection of Canadian~facts and furnishings.
Res. '374 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
proceed immediately with an application to Wintario for funds, amounting to
approximately $12,000.00, to purchase a portion of the Mrs. Hilda Hull
collection of Canadiana; and
THAT the collection be stored at the Bl;ack Creek Pioneer viilage as soon as an
agreement has been completed with Mrs. Hull. '
CARRIED,
NEW BUSINESS
. .
25. EXECUTIVE COMMITTEE MEETING 'l4/79
-September 1', 1979
The Chairman advised that he will be absent from at least part of the above-
noted meeting. It is probable that the Vice Chairman will also be absent.
In accordance with Section 16-(3) of The Conservation Authorities Act,
therefore, it will be necessary for the members present at the meeting to
appoint an acting chairman.
26. EXECUTIVE COMMITTEE MEETING '15/79
-October 3, 1979
Due to the scheduled date of the above-noted meeting conflicting with the 1979
Conservation Authorities' Tour, September 30-0ctober 3, it was agreed that
Meeting 115/79 will be held on THURSDAY, OCTOBER 4, 1979, cOllllllencing at lO: 00
a.m. at the Authority office.
27. PERSONNEL SUB-COMMITTEE MEETING 15/79
The Personnel Sub-Committee will meet at the Authority office at 10 AM TUESDAY,
SEPTEMBER l8, ],.979, to appoint the Administrator of Finance. The Chairman of
the Finance Sub-Committee was requested to attend.
28. FINANCE SUB-COMMITTEE MEETING 15/79
The Finance Sub-Committee will meet at the Authority office on TUESDAY,
SEPTEMBER 25, 1979, commencing at 1:30 p.m. to deal with the 1980 preliminary
Budget Estimates and the 1981-l984 Multi-Year Forecast.
29. CORRESPONDENCE
The Chairman advised that a letter, dated August 3l, 1979, has been received
from Mrs. J. Trimmer. At Mrs. Trimmer's request, her letter will be placed on
the agenda of Authority Meeting '5/79 scheduled to be held Friday, October l2,
1979.
30. ADJOURNMENT
On Motion, the meeting adjourned at 12:15 p.m., September 5, 1979.
R. Grant Henderson . K.G. Higgs
Chairman Secretary-Treasurer
-,
"
B-298
SCHEDULE "An
PERSONNEL SUB-COMMITTEE
REPORT 1/4/79
The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive,
DOWNSVIEW. Ontario on Wednesday, September 5, 1979 commencing at 8:30 a.m.
PRESENT WERE
.
Chairman Mrs. L. Hancey
Members M. J. Breen
Dr. T. H. Leith
Mrs. S. Martin
Authority Member J. S. Scott
Secretary-Treasurer K. G. Higgs
Director of Planning & Policy W. A. McLean
Information & Education Division K. W. Strasser
ABSENT WERE
Member E. V. Kolb
Authority Chairman R. G. Henderson
Authority Vice-Chairman Mrs. .F. Gell
THE FOLLOWING ITEM WAS DISCUSSED:-
1) Review of appointment of K, W. Stasser as Special Advisor, Kortright
Centre for Conservation in accordance with the procedures established
in the Personnel Manual and at the request of Mr. Strasser.
IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS;-
1) THAT Mr. K, W. Strasser be appointed Special Advisor , assigned to
the Kortright Centre for Conservation, effective October 1, 1979 at
a salary as approved by the Personnel Sub-Committee at Meeting 14/79
held on September 5, 1979.
Mrs, L. Hancey, Chairman K. G. Higgs, Secretary-Treasurer
:wr
1979.09.05.
.
"
8-299
the metropolitan 1oronto and region conservation authority
minutes Report tl4/79
EXECUTIVE CO~~TTEE ~DAY-SEPTEMBER-19-1979 114/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, September 19, 1979, commencing at 10:00 a.m.
PRESENT FOR THE BEARING
Chairman R. Grant Henderson
Members (For E.V. J(olb) WIn. G. Barber
Mrs. J.A. Gardner
Mrs. L. Hancey
Dr. 'l'.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Biggs
Director of PlaIming aDd Po~icy W.A. McLean
Adm. - Conservation LaDa Management Division P.B. Flood
Adm. - ~"'ater Resource Division M.R. Garrett
Planning Technician, pl~nn;ng & Policy Miss A. Aitken
Research Planner, P1a.nn.ing & Policy Mrs. A.C. Deans
Project Planner, Water Resource Division T.E. Farrell
Development Co-ordinator, Planning & Policy J . W . Maletich
Bead, Flood Control Section, WRD J.C. Mather
Co-ordinator, Experience '79 Program Miss J .L. Rutledge
HEARING
Following the Roll Call, ~e ~t.ing recessed to hold a Bearing re:
F. & N. Campi tell.i -&- c. 1ileeks
Town of Ajax
Duffin Creek Watershed
Miss L. Trivelli reccriied the pxoceedings of the Hearing.
PRESENT FOR THE MEET'ING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members (For E.V. J(olb) Wm. G. Barber
M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Biggs
Director of Planning ana Policy W.A. McLean
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Research Planner, Planning & Policy Mrs. A.C. Deans
Development Co-ordinator, Planning & policy J'. W. Maletich
Head, Flood Control Section., WRD J.C. Mather
Co-ordinator, Experience '79 Program Miss J.L. R~tl.edge
ABSENT WERE
Members C.F. Kline
E.V. Kolb
r'
B-300 -2-
MINUTES
The Minutes of Meeting #13/79 were pre~ented.
Res. #375 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Minutes of Meeting #13/79, as presented, be adopted as if read.
CARRIED,
SECTION I
-
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE CO~~ITTEE:
1. DECISION OF HEARING
-F. & N. Campitelli -&- C. Weeks
Town of Ajax
Duffin Creek Watershed
'Res. #376 Moved by: J.S. Scott
Seconded by: Mrs. S. Martin
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this 19th day of September, 1979; and
THAT the application of Fred and Nino Campitelli and Charles Weeks, in accord-
ance with Ontario Regulation 735/73, for permission to construct a building on
the south side of Orchard Road, Part of Lot 16, Concesison 1, Town of Ajax
(Duffin Creek watershed), be approved, subject to:
.The applicant incorporating in the construction
of the building protective measures and
structural measures to withstand depths of
water up to two ( 2) meters.
CA1UtIEQ;
2. ONTARIO REGULATION 735/73
-Special Meeting of Executive Committee
At a recent meeting of the Executive Committee, it was suggested that a meeting
of the Committee be held to deal with the concepts and terminology involved in
the adopted Flood Control Plan, particularly as they affect the responsibilities
of the Executive Committee in the administration of Ontario Regulation 735/73.
Res. #377 Moved by: Mrs. F. Gell
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Executive Committee meeting to deal with the matter of the
concepts and terminology involved in the adopted Flood Control Plan,
particularly as they affect the responsibilities of the Executive Committee in
the administration of Ontario Regulation 735/73, be scheduled for Wednesday
afternoon, October 24, 1979, following the regularly scheduled meeting of that
date.
CAlUUED;
3. 1982 BIENNIAL CONFERENCE OF CONSERVATION AUTHORITIES
-Appointment of Committee
The Secretary-Treasurer presented a communication concerning commencement of
preparations for the 1982. Biennial Conference of Conservation Authorities, for
which The.Metropolitan Toronto and Region Conservation Authority is the host
authority.
Res. #378 Moved by: E.H. Card
Seconded by: J.S. Scott
-3- B-301
RESOLVED THAT: Having regard to the 1982 Biennial Conference of Conservation
Authorities, for which The Metropolitan Toronto and Region Conservation
Authority will be host authority, the following be appointed a committee to
make the necessary preparations for the Conference:
Chairman: Secretary-Treasurer, M.T.R.C.A.
Members: Chairman, M.T.R.C.A.
Vice Chairman, M.T.R.C.A.
Chairman, Information & Education
Advisory Boar~, M.T.R.C.A.
CARRIEO,
4. EXPERIENCE '79 - PROGRAM #1609
-Final Report
Miss J.L. Rutledge, Co-ordinator of the above-noted programme, presented her
report.
Res. #379 Moved by: Mrs. S. Martin
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The report on Experience. '79, Program '1609, be received with
appreciation; and
THAT the following action be taken:
(a) Miss J.L. Rutledge, Co-ordinator, Experience '79 - Program '1609, be
thanked for her comprehensive report,
(b) copies of the report be forwarded, for information, to the Ontario
Youth Secretariat and the Minister of Natural Resources;
(c) the Authority thank the Province of Ontario for its sponsorship of the
Experience '79 programme; and request the Province to give careful
consideration to the recommendations contained in the report in
planning for future Experience programmes.
CAJUtIEO,
5. REPORT #5/79 - PERSONNEL
SUB-CO~t!olITTEE
Mrs. Hancey presented Report #5/79 of the Personnel Sub-Committee.
Res. #380 Moved by: Mrs. L. Bancey
Seconded by: Dr. T.B. Leith
RESOLVED THAT: Report #5/79 of the Personnel Sub-Committee be received and
adopted and appended as Schedule "A" of these Minutes.
CAJUtIEO,
6. AUTHORITY MEETING #5/79 - OCTOBER 12, 1979
-Hurricane Hazel Slide Presentation
A staff communication was presented suggesting that it might be appropriate,
at the above-noted meeting, to have a slide presentation commemorating the
twenty-fifth anniversary of Hurricane Hazel, which occurs on October 14, 1979.
Res. #381 Moved by: Mrs. J.A. Gardner
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Secretary-Treasurer be directed to make a slide present-
ation to Meeting #5/79 of The Metropolitan Toronto and Region Conservation
Authority, to be held October 12, 1979, to commemorate the Twenty-Fifth
Anniversary of Hurricane Hazel on October 14, 1979. CARRIEO,
7. BRUCE'S MILL CONSERVATION AREA
-Quotation: Mill Foundation
A staff communication was presented advising that the following two quotations
(of four invitations) have been received for the construction of a stone
foundation wall for the mill at the above location:
B-302 -4-
C.T.M. General Contractor
For the supply of all labour and materials, except the
stone facing, and for the installation of the concrete
block and stone on the perimeter . . . $7,800.00
Additional stone facing per square yard . . . 50.00
For the supply and installation of
l' x 6: perimeter flashing . . . 500.00
Leo Veiiola
For the supply of labour only for 8" concrete wall,
complete with stone facing and flashing . . . $5,000.00
Additional stone facing per square yard . . . 50.00
Materials supplied by ~!.T.R.C .A., including
blocks, mortar and flashing . . . 1,000.00
Res. #382 Moved by: M.W.H. Biggar
Seconded by: E.H. Card
RESOLVED THAT: The quotation received from Leo Veijola for the supply of
labour required for the installation of the foundation for the mill at Bruce's
Mill Conservation Area, in the sum of $5,000.00; and for any additional stone
work at $50.00 per square yard, be accepted.
CARRIED,
8. 1979 BUDGET REVISIONS
-Organizational Review, Phase 1:
Financing
A staff communication was presented advising that approval has been received
from the Province of Ontario for the above-noted study. The Province has
advised that the cost of the study is eligible under Water and Related Land
Management support costs at a 55% g~ant rate.
Res. #383 Moved by: M.J. Breen
Seconded by: E.H. Card
RESOLVED THAT: The 1979 budget adjustment, in the amount of $12,000.00, in the
Water and Related Land Management Programme - Water Management Regulations, to
provide for the 'cost of the Organizational Review Study, as appended as
Schedule "B" of these Minutes, be approved.
CARRIED;
9. FINANCIAL REPORT AND ACCOUNTS
-August, 1979
Mr. Scott presented the Financial Report and Accounts for the month of August,
1979.
Res. #384 Moved by: J.S. Scott
Seconded by: W.G. Barber
RESOLVED THAT: The Financial Statement for the month of August, as amended, be
received; and that the payment of the Authority accounts, in the amount of
$1,070,177.94, being ( a) Current Expenditures - Wages & Salaries $318,542.11;
Materials & Supplies $227,813.89; (b) Capital Expenditures - Wages & Salaries
$35,554.71; Materials & Supplies $449,144.29; (c) Other Programmes - Wages'
Salaries $37,419.22; Materials and Supplies $1,703.72, be approved.
CAJUtIED,
10. COUNCIL OF OUTDOOR EDUCATORS OF ONTARIO -
ANNUAL CONFERENCE AND RESIDENTIAL WORKSHOP,
TAWINGO OUTDOOR CENTRE, HUNTSVILLE, ONT.,
SEPTEMBER 26-28, 1979
-Attendance at
A staff communication was presented advising .that at its Meeting 110/79, the
Executive Committee adopted the following resolution:
"Res. #270
RESOLVED THAT: Messrs. Terry Carr, Ron Hudson, Andy Wickens,
Miss Jean Wansbrough and l1iss Brenda Wright, be authorized to
-5- B-303
attend the C.O.E.O. Conference and Residential Workshop at the
Tawil\go Outdoor Centre, in HUl'ltsville, Ontario, September 26-28',
1979 and that their estimated expenses in the amount of $50.00
each, plus travelling costs, be paid."
Since that time, Mr. David Young, Project Coordinator, Claremont Conservation
Field Centre, has been invited to attend the conference and to convene
sessions in the programme.
Res. #385 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
RESOLVED THAT: ~1r. David Young, Project Coordinator, Claremont Conservation
Field Centre, be authorized to attend the Council of Outdoor Educators of
Ontario Conference and Residential Workshop at the Tawingo Outdoor Centre,
Huntsville, Ontario, September 26-28, 1979; and
THAT his expenses, in the estimated amount of $50.00, plus travelling costs,
be paid.
CARRIED;
II. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Quarry Investments Limited
To construct storm sewer outfall to service proposed
residential subdivision east of Bathurst Street and
south of Elgin Mills Road, Town of Richmond Hill
(Don River Watershed)
A staff communication was presented advising that an application has been
received from Quarry Investments Limited for permission to construct a storm
sewer outfall at the above location.
Res. #386 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the application of
Quarry Investments Limited, be received; and
THAT the application of Quarry Investments Limited for permission to construct
a storm sewer outfall on Lot 50, Concession lW, Town of Richmond Hill (Little
Don River watershed), be approved, subject to:
(a) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(b) Every effort being made to minimize silting of the watercourse during
construction;
(c) All work being carried out in accordance with Drawing No.640-302,
prepared by R.R. Higgins & Associates Limited, dated July 6, 1979.
CAJUtIED,
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Cadillac Fairview Corporation Limited &
Ventro Construction Limited
To alter a section of the Little Etobicoke Creek in the
vicinity of Burnhamthorpe and Tomken Roads, Ci ty of
Mississauga
A staff communication was presented advising that an application has been
received from Cadillac Fairview Corporation Limited and Ventro Construction
Limited for permission to deepen and channelize the Little Etobicoke Creek at
the above location.
Res. i387 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the appl~cation of
Cadillac Fairview Corporation Limited and Ventro Construction Limited, be
received; and
THAT the application of Cadillac Fairview Corporation Limited and Ventro
Construction Limited, for permission to alter the Little Etobicoke Creek on
Lot 7, Concession 2, N.D.S., City of Mississauga, be approved, subject to:
B-304 -6-
(a) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(b) EveFY effort being made to minimize silting of the watercourse
during construction; .
(c) All work being carried out in accordance with Drawings Nos. 18,
19, 21 and 23, 43 to 52, Project No.l1-73185, and Drawings Nos.
20, 44, 45 and 46, Project No.ll-77069, as prepared by Marshall,
Macklin, Monaghan Limited, dated October, 1978.
CARRIED,
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Cadillac Fairview Corporation Limited
To alter and channelize a portion of the New Westminster
Creek north of Steeles Avenue, east of Dufferin Street,
Town of Vaughan (Don River Watershed)
A staff communication was presented advising that an application has been
received from Cadillac Fairview Corporation Limited for permission to alter
and channelize part of the New Westminster Creek at the-above location.
Res. #388 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the apglication of
Cadillac Fairview Corporation Limited, be received; and
THAT the application of Cadillac Fairview Corporation Limited for permission
to alter and channelize a section of the New Westminster Creek on Lot 1,
Concession 2, Town of Vaughan (Don River watershed), be approved, subject to:
(a) All areas disturbed due to construction being restored to the
satisfaction of the Authority,
(2) Every effort being made to minimize silting of the watercourse
during construction;
(3) All work being carried out in accordance with Drawing No.
Al-78120-G14, dated August 1979.
CARRXED,
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Runnymede Development Corporation Limited
To construct storm sewer outfalls into an existing
creek on the east side of Dixie Road, Town of Pickering
(Frenchman's Bay)
A staff communication was presented advising that an application has been
received from Runnymede Development Corporation Limited for permission to
construct storm sewer outfalls into an existing creek at the above location.
Res. #389 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the application of
Runnymede Development Corporation Limited, be received; and
THAT the application of Runnymede Development Corporation Limited for a permit
to construct storm sewer outfalls into an existing creek on Block .U., Plan
M-I039, on the east side of Dixie Road, Town of Pickering (Frenchman's Bay),
be approved, subject to:
(a) All work being undertaken and completed in accordance with Drawing '1,
Project No.8l84-02, as prepared by M.M. Dillon Limited, Consulting
Engineers and Planners, dated April 1979, and approved by the Town of
Pickering Public Works Department'
(b) Every effort being made to minimize silting of the watercourse during
construction;
(c) All work being completed to the satisfaction of the Town of pickering
and The Regional Municipality of Durham7
-7- B-305
(d) All areas disturbed due to const~uction on the site being restored
to the satisfaction of the Authority and of the Town of Pickering.
CARRIED;
15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Adjala
To reconstruct the Third Line culvert on Lot 1,
Concessions 2 & 3 (Humber River Watershed)
A staff communication was presented advising that an application has been
received from the Town of Adjala for permission to reconstruct the Third Line
Culvert at the above location.
Res. #390 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with the application of the
Town of Adjala, be received; and
THAT the application of the Town of Adjala for permission to reconstruct the
Third Line Culvert on Lot 1, Concessions 2 and 3, Town of Adjala (Humber River
watershed), be approved, subject to:
(a) The culverts being designed to allow flows from at least the 25-year
flood to pass without obstruction;
(b) The proposed river diversion, though minor, being restored with
rip rap. If the broken concrete from the existing culvert is to be
used, it must be properly placed to provide stability and an unobjection-
able appearance;
(c) Rip rap being placed upstream and downstream of the proposed culverts
for a distance of at least forty feet. This rip rap must be placed on
the banks and bed of the watercourse and must be preceded by a filter mat
or a 6"-12" layer of crushed stone;
(d) Every effort being made to minimize silting of the creek during
construction,
( e) The Ministry of Natural Resources and the Ministry of Transportation and
Communications being notified;
( f) All areas disturbed due to construction being restored to the satis-
faction of.the Authority.
CAJUtIED,
16. STORM WATER MANAGEMENT PROGRAMME
A staff report was presented having regard to preparing detailed proqrammes
for the Watershed Plan, as follows:
Land Acquisition Programme (draft to Board Aug.23,1979)
Erosion and Sediment Control Programme (draft to Bami Aug.2J,1979)
Community Relations Programme
Flood Control Programme
Conservation Services Programme
Staff originally felt that the Storm Water Management aspect could be covered
generally under the Erosion Control and Flood Control Programmes; however,
they now feel that this would not provide the necessary direction and
prominance required by storm water management issues.
Res. #391 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: The firm of The Proctor & Redfern Group be retained to prepare
a programme document on Storm Water Management, which will form a part of the
Authority's Watershed Plan, at a cost not to exceed $42,500.00.
CARRXED,
B-306 -8-
17. REPORT #2/79 - WATERFRONT
ADVISORY BOARD
Mr. Breen presented Report #2/79 9f the Waterfront Advisory Board.
Res. #392 Moved by: Mrs. .F. Gell
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Report #2/79 of the Waterfront Advisory Board be received; and
THAT the recommendations, as set forth herein, be adopted:
U The 1980 Budget Estimates for the Waterfront Section, Water Resource
Division, as appended as Schedule "A" of the ~1inutes of Meeting 12/79 of
the Waterfront Advisory Board, be included in the 19.80 Preliminary Budget
Estimates of the Authority; and
THAT every effort be made to secure approval of the Supplementary Water-
front Project funding.
12 The Multi-Year Forecast for the period 1981-1984 for the Waterfront
Section, Water Resource Division, dated 1979.09.95, be approved in
principle and included in the 1981-1984 Multi-Year Forecast of the
Authority.
II The Commodore and Board of Directors of the Frenchman's.Bay Yacht Club be
advised that the sale of Authority-owned land at this location is con-
trary to established policy; however, a long-term lease may be a
reasonable alternative; and
THAT the Property and Administration Division, in conjunction with the
Water Resource Division, be directed to attempt to negotiate a suitable
long-term lease with the Frenchman's Bay Yacht Club; the details of said
lease to be presented to the Board at a future meeting.
!! The 1980 Shoreline Management Priorities, as follows, be approved:
(a) Eastern Beaches (brought forward from 1979) ,
(b) Acquisition o~ endangered propert~es;
(c) Construction of shore protection at the corner of Kingsbury
and Harding to stabilize the toe of the fill recently placed
by the Borough of Scarborough;
(d) Construction of shore protection along Guildwood Parkway.
CARRIED;
18. WATERFRONT PROJECT 1977-1981 - SCARBOROUGH SECTOR:
BLUFFERS PARK PHASE II
-Hydro Installation
A staff communication was presented advising that, under the agreement with
the Boating Federation at Bluffers Park Waterfront Area that arterial servic-
ing will be provided to the property line, the following quotations have been
received by the Authority's consultant, D.E. McGregor & Associates Limited.
TwO quotations were received of four invitations:
K-Line Construction Limited $57,107.00
Cliffside Pipelayers Limited $40,420.00
Res. #393 Moved by: M.W.H. Biggar
Seconded by: W.G. Barber
RESOLVED THAT: The quotation of Cliffside Pipelayers Limited, for the
installation of electrical services at Bluffers Park Waterfront Area, in the
amount of $40,420.00, be accepted, and
THAT the approval of the province of Ontario be requested. CARRIED,
-9- B-307
19. DEVELOPMENT CONTROL STAFF, PLANNING & POLICY
-Telephone Calls
A staff pommunication was presented advising that at Meeting #12/79, the
Executive Committee considered a report of the Personnel Sub-Committee which
requested the Secretary-Treasurer to review the matter of response to
telephone messages by the Development Control Staff, Planning, POlicy. A
verbal report on the matter was presented by the Director of Planning and
Policy to the Executive Committee at Meeting #13/79.
The report of Mr. W.A. McLean, dated 1979.09.12 informed the Committee that a
new practice has been instituted whereby the name of the staff member dealing
with a specific matter appears in a prominent place in correspondence dealing
therewith in order that the person who can be of the most help may be con-
tacted directly.
Res. #394 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, dated 1979.09.1~, having regard to
telephone calls - Development Control Staff, Planning & Policy, be received
for information.
CARRIED,
20. HURRICANE HAZEL TWENTY-FIFTH ANNIVERSARY
-Planning Committee Meeting #1/79
The staff presented a report of Meeting #1/79 of the Hurricane Hazel TWenty-
Fifth Anniversary Planning Committee.
Res. #395 Moved by: Dr. T.H. Leith
Seconded by: M.W.H. Biggar
RESOLVED THAT: The staff be directed to proceed with the proposed Seminar on
the Twenty-Fifth Anniversary of Hurricane Hazel, and that arrangements be made
for it to be held in the Council Chamber, Toronto City Hall, on Wednesday,
October 3, 1979, at 2:00 p.m., and
THAT the Borough of Etobicoke be requested to organize an interfaith memQrial
church service to be held on October 14, 1979, in the afternoon, near the
memorial monument to the lost firemen (Old Mill area).
CARRIED;
NEW BUSINESS
21. MUNICIPAL LAW ENFORCEMENT OFFICERS' FOUNDING CONFERENCE 1979,
SUDBURY, ONTARIO: SEPTEMBER 16-18, 1979
-Attendance at
Res. '396 Moved by: E.H. Card
Seconded by: Mrs. F. Gell
RESOLVED THAT: The attendance of Mr. J.D. MacKay, Enforcement Officer,
Planning & Policy, at the Municipal Law Enforcement Officers" Founding
Conference 1979, ,Sudbury, Ontario, September 16-18, 1979, be authorized; and
THAT his expenses in connection therewith, in the amount of $108.94, be paid.
CARRIED,
22. ADJOURNMENT
On Motion, the Meeting adiourned at 1:30 p.~., September 19.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
B-308
SCHEDULE "A" PERSONNEL SUB-COMMITTEE
REPORT # 5/7 9
The Personnel Sub-Committee met at the Authority Office, 5 Shore ham
Drive, DOWNSVIEW, Ontario on Tuesday, September 18, 1979 commencing at
10:00 a.m.
PRESENT WERE
Chairman Mrs. L. Hancey
Members M. J. Breen
E. V. Kolb
Dr. T. H. Leith
"Mrs. S. Martin
Authority Member J. S. Scott
Authority Chairman R. G. Henderson
Secretary-Treasurer K. G. Higgs
Director, Planning and Policy W. A. McLean
ABSENT WERE
Authority Vice-Chairman Mrs. F. Gell
The following items were discussed:-
1) AD ointment of Administrator of Finance:- The Committee interviewed
the 01 oW1ng four cand1dates for t e position of Administrator of
Finance:-
Mr. Paul D. Burton
Mr. George A. Cox
Mr. Guy Dudar
Mrs. Marie Mosseau
2) Appointments, transfers and/or promotions to the Full Time and Full
Time Probationary Staff;
IT WAS AGREED AND THE SUB-COMMITTEE RECOMMENDS:-
1) APPOINTMENT OF ADMINISTRATOR OF FINANCE
THAT Mr. Guy Dudar be appointed Administrator of Finance, effective
immediately, at a salary as approved by the Personnel Sub-Committee
under date of September 18, 1979.
2) APPOINT~~NTS, TRANSFERS AND/OR PROMOTIONS
TO THE FULL TIME & FULL TIME PROBATIONARY STAFF
THAT the following appointments, transfers and/or promotions be
made to the Full Time and Full Time Probationary Staff:-
a) Appointments to the Full Time Staff
Wilson, L. Building Manager I July 1, 1979
Hayton, A. Project Biologist August 27, 1979
b) Promotions within the Full Time Staff
King, J. Clerk Typist Sept. 30, 1979
Garland, P. Stockman Sept. 30, 1979
McClure, R. Head Stockman Sept. 30, 1979
Stoop, C. Head Gardener Sept. 30, 1979
c) Appointments to the Full Time PrObationary Staff
Hayden, C. A. Secretary-Foundation August 20, 1979
Pilato, L. Senior Secretary Sept. 1, 1979
Mrs. L. Hancey, Chairman K. G. Higgs, Secretary-Treasurer
-- --
~ !a.."-
1 9 7 9 BUD GET REV I S ION S PAGE: ~
PROGRAM: Water & Related Land Management Interim Project Summary Current & Capital DATE: lQ7Q_nQ_l'l
o RIG I N A L BUD GET REV I SED BUD GET
Sources of Financing Sources of Financing
Net Provincial ~hmiciJlal Net Provincial Municipal
ACT I V I T Y Expendi tures Grant Levy Other Expenditures Grant Levy Other
Current
Regulations 182,500 100,371; 82,125 170,500 93,775 76,725
Organizational Review Study 12,000 6,600 5,400
fI)
n
=
tIJ
:3
t"
tIJ
.
Ql
..
Ql
I
w
0
\0
~ 8-310
,
the metropolitan toronto and region conservation authority
minutes Reporl t15/79
EXECUTIVE COMMITTEE THURSDAY-OCTOBER-4-1979 115/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Thursday, October 4, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. P. Gell
Members M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
(For Mr. M.W.H. Biggar) F.R. Perkins
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Research Planner, Planning and Policy Mrs. A.C. Deans
Head, Waterfront Section, wac B.E. Denney
Development Co-ordinator, Planning & Policy J . W. Maletich
Enforcement Officer, Planning & Policy H.J.B. McCaffrey
Senior Administrative Secretary, P'P Mrs. M. Mitchell
HEARING
Following the Roll Call, the meeting recessed to hold a Hearing. re:
Mr. William Malamas
Town of Markham
Don River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
(For Mr. M.W.H. Biggar) F.R. Perkins
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and pol~cy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Property , Administration Division W.t. Jones
Research Planner, Planning and Policy Mrs. A.C. Deans
.
B-311 -2-
PRESENT FOR THE MEETING (Contd. )
Head, Waterfront Section, WRD B.E. Denney
Deve10pment Co-ordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
ABSENT WAS
Member M.W.H. Biggar
MINUTES
The Minutes of Meeting 114/79 were presented.
Res. 1397 Moved by: Mrs. F. Gel!
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Minutes of Meeting '14/79, as presented, be adopted as if read.
. CARRIED,
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
1. REPORT 15/79
FINANCE SUB-COMMITTEE
Mr. Scott presented Report '5/79 of the Finance Sub-Committee.
Res. 1398 Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: Report '5/79 of the Finance Sub-Committee be received and
appended as Schedule "A" of these Minutes, and
'tHE EXECUTIVE COMMITTeE RECOMMENDS THAT: The 1980 Preliminary Budget Estimates,
as appended as Schedule "B" of these Minutes; the 1981-1984 Multi-Year Forecast,
as appended as Schedule "C" of these Minutes; and Amendment to Ontari~
Regulation 845/77 As Amended, as appended as Schedule "0" of these Minutes, be
approved.
CARRIED,
2. REPORT . 2/79
CONSERVATION LAND MANAGE~mNT ADVISORY BOARD
Mr. Kolb presented Report '2/79 of the Con~ervation Land Management Advisory
Board.
Res. 1399 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: Report '2/79 of the Conservation Land Management Advisory Board
be received, and '
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Recommendation '2, as set forth'
herein, be adopted:
II The 1979 Budget Revisions, Water and Related Land Management - Interim
Project Current (W3) (W8), as appended as Schedule "An of the Minutes of
Meeting .2/79 of the Conservation Land Management Advisory Board, be
approved. CARRIED,
3. APPOINTMENT OF AUTHORITY MEMBER
-The Regional Municipali~Y of Peel
A communtcation was presented advising that Mr. R. Skjarum has been appointed to
The Metropolitan Toronto and Region Conservation Authority to replace Mr. F.
Frank Bean, recently appointed Chairman of the Region.
Res. 1400 Moved by: E.V. Kolb
Seconded by: C.F. Kline
-3- 8,..312
RESOLVED THAT: The information received from The Regional Municipality of Peel
regarding the appointment of Mr. R. Skjarum as a Member of the Authority,
effective September 27, 1979, be received, and
THAT Mr. R. Skjarum's name be added to the list of Authority Members, and
further
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Mr. R. Skjarum be appointed to the
Flood'Control and Water Conservation Advisory Board and to the Ebobicoke-Mimico
Advisory Board, effective October 12, 1979., .
CARRIED,
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF ~HE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE;
4. DECISION OF HEARING
-Mr. William Malamas
Town of Markham
Don River Watershed
Res. 1401 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
BE IT RESOLVED THAT: This Executive Committee confirm the ~ecision of the
Hearing held this 4th day of October, 1979; and
THAT the application of Mr. william Malamas, in accordance with Ontario
.Regulation 735/73, for permission to construct a retaining wall and to place
fill on the flood plain of the Don River, on Lot 13, Reference Plan '64R-5979,
Town of Markham (Don River watershed), be refused for the following reason:
.That the application of Mr. Malamas, as s"ubmitted, will affect the
control of flooding. CARRIED'
5. BILL 162 - THE REGIONAL MUNICIPALITY OF 'DURHAM ACT, 1973
-Proposed Authority Brief
A communication was presented advising that the Council of The Regional
Municipality of Durham has passed a resolution to establish a committee to
carry out a study of Bill 162. The Committee has set up a series of public
meetings and has directed, by resolution, as follows:
-That the Councils of the area municipalities, the boards of education,'
the public utilities commissions, The police Commission, the
conservation authorities, The Health Unit and The Children's Aid
Society be invited to present written briefs to the Committee by
December 5, 1979."
Res. 1402 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff be directed to prepare a brief suitable for submission
to The Regional Municipality of Durham in connection with their study of Bill
162, The Regional Municipali'ty of Durham Act, 1973.
. CARRIED,
6. REPORT #2/79
CONSERVATION LAND MANAGEMENT ADVISORY BOARD
Mr. Kolb presented Report 12/79 of the Conservation Land Management Advisory
Board.
Res. 1403 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: Report 12/79 of the Conservation Land Management Advisory Board
be received; and
THAT Recommendations '1, i3, '4, is and i6, as se~ forth herein, be approved:
.
B-313 -4-
!! The Small Craft Programme at the Claireville Conservation Area be adopted
as a programme of the Authority; and
THAT the staff be directed ~o provide a Rental and Instructional Programme,
AND FURTHER THAT the staff be requested to discuss with officials of The
Municipality of Metropolitan Toronto Parks Department the availability of
surplus canoes from the Toronto Island.
!! The 1980 Budget Estimates for the Conservation Land Management Division,
as amended and appended as Schedule "B" of the Minutes of Meeting 12/79 of
the Conservation Land Management Advisory Board, be included in the 1980
Preliminary Budget Estimates of the Authority.
!! The Multi-Year Forecast 1981-1984, as amended and appended as Schedule "C"
of the Minutes of Meeting #2/79 of the Conservation Land Management Advis-
ory Board, be approved, in principle, and included'in the 1981-1984 Multi-
Year Forecast of the Authority.
12- The fee schedule amendments to Ontario Regulation 845/77, a regulation made
under The Conservation Authorities Act, as appended as Schedule ."0" of the
Minutes of Meeting #2/79 of the Conservation Land Management Advisory
Board, be included in the 1980 Amendments to Ontario Regulation 845/77.
'6 Authority staff be authorized to hold a public workshop, to promote the
understanding of and the demand for stream enhancement works, in
conjunction with the Ministry of Natural Resources. CARRIED,
7. COLD CREEK CONSERVATION AREA
-Quotation: Supply of Lumber - Rifle Range Improvements .
A staff communication was presented advising that the following quotations have
been received for the supply of 1,200 linear feet of 6" x 8" Pressure Treated
Jack Pine for the extension of the Rifle Range back stops at the Cold Creek
Conservation Area:
Supplier ~
Domtar Chemicals Limited $2,844.00 + P.S.T.
A.F.A. Forest Products $2,832.00 + P.S.T.
Hanford Lumber $2,640.00 + P.S.T.
Res. 1404 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The quotation received from Hanford Lumber for the supply of
1,200 linear feet of 6" x 8" Jack Pine Pressure Treated lumber, in the sum of
$2,640.00 + P.S.T., be accepted; it being the lowest quotation received.
CARRIED,
8. REPORT 13/79
HISTORICAL SITES ADVISORY BOARD
Report 13/79 of the Historical Sites Advisory Board was presented.
Res. 1405 Moved by: Mrs, F. Gell
Seconded by: F.R. Perkins
RESOLVED THAT: Report 13/79 of the Historical Sites Advisory Board be received,
and
THAT the 1980 Preliminary Budget Estimates for the Historical sites Division,
as appended as Schedule "A" of the Minutes of Meeting 13/79 of the Historic~l
Sites Advisory Board, be included in the 1980 ~reliminary Budget Estimates of
the Authority. CARRIED'
9. BLACK CREEK P IONEER VIL~AGE
-visitor Centre
A staff report was presented in connection with the proposed Visitor Centre for
the Black Creek Pioneer Village.
Res. '406 Moved by: Mrs. :J .A. Gardner
Seconded by: F.R. Perkins
.
-5- B-314
RESOLVED THAT: The Chairman of The Metropolitan Toronto and Region Conservation
Authority appoint a committee to meet with representatives' of the Authority's
member municipalities, the Province of Ontario and The Metropolitan Toronto and
Region CQnservation Foundation tQ'seek their financial support for 'the visitor
Centre at the Black Creek Pioneer Village.
CARRIED,
10. REPORT #2/79
INFORMATION & EDUCATION ADVISORY BOARD
Dr. Leith presented Report 12/79 of the Information and Education Advisory
Board.
Res. #407 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Gell
RESOLVED THAT: Report 12/79 of the Information and Education Advisory Board be
received, and
THAT Recommendations 11, 12, '3, 14 and 15, as set forth herein, be approved:
n The Policy of The Metropolitan Toronto and Region Conservation Authority
regarding the Community Relations Support proqram, dated September 27,
1979, as appended as Schedule nAil of the Minutes of Meeting 12/79 of the
Information and Education Advisory Board, be approved.
'2 The 1980 Community Relations Support Program, dated September 27, 1979, as
appended as Schedule "B" of the Minutes of Meeting 12/79 of the Inform-
ation and Education Advisory Board, be received and approv.ed, and
THAT the staff be authorized and directed to carry out the proqram within
the limits of the 1980 budget allocation.
t3 The 1980 Preliminary Budget Estimates for the Information and Education
DiviSion, as appended as Schedule ncn of the Minutes of Meeting 12/79 of
the Information and Education Advisory Board, be included in the 1980
Preliminary Budget Estimates of the Authority.
t4 The amendments to Schedule - Section 44 of Ontario Regulation 845/77, As
Amended - Regulation made under The Conservation Authorities Act, as
appended as Schedule "D" of the Minutes of Meeting 12/79 of the Information
and Education Advisory Board, be included in the 1980 Amendments. to
Ontario Regulation 845/77.
'5 The Multi-Year Forecast 1981-1984, as appended as Schedule "E" of the
Minutes of Meeting #2/79 of the Information and Education Advisory Board,
be approved, in principle, and included in the 1981-1984 Multi-Year Fore-
cast of the Authority.
CARRIED,
11. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Dormitory Shell
A staff communication was presented regarding construction of the shell for
the second dormitory building at the Lake St. George Conservation Field ~entre.
Res. 1408 Moved by: . E. V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The contract for the construction of the shell of the second
dormitory building at the Lake St. George Conservation Field Centre be awarded
to Leonard Construction Company, at their quoted price of $86,500.00~ and that
the award be subject to:
(a) A performance bond being received by the Authority prior to the
signing of the contract; .
(b) The shell being completed within a twelve-fifteen week period
from the date of awarding the contract.
CARRIED,
B-315 -6-
12. REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO
The Director of Planning and Policy presented a communication advising that at
Meeting #9/79, held June 27, 1979, the Executive Committee adopted the follow-
ing resolution:
"THAT the communication from The Honourable James A.C. Auld, Minister of
Natural Resources, and the Report of the Working Group on the Mandate and
Role'of the Conservation Authorities of On~arioi be received and appended
to the Minutes, and
THAT copies of the Minister's letter and the Report be circulated to the
Authority's member municipalities for comment by August 15, 1979,
AND FURTHER THAT following receipt of municipal comments, s~aff be directed
to prepare a report and recommendations for consideration by the Executive
Committee."
The deadline for comment was subsequently extended by the Ministry, and the
Authority revised its request accordingly to September 21, 1979.
Res. 1409 Moved by: M.J. Breen
Seconded by: Mrs. F. Gell
RESOLVED THAT: The communication having regard to the Report of the working
Group on the Mandate and Role of the Conservation Authorities of Ontario be
received, and
THAT the Executive Committee in~orm the Ministry of Natural Resources of its
support of the recommendations of the Report of the Working Group on the Mandate
and Role of the Conservation Authorities of Ontario, and
THAT the staff report concerning the municipal responses to the Report of the
Working Group be received and appended as Schedule "E" of these Minutes, and
forwarded, together with copies of each municipality's individual comment, to
the Ministry of Natural Resources,.
AND FURTHER THAT copies of any subsequent municipal replies, received too late
for inclusion in this report, also be forwarded to the Ministry.
CARRIED,
!!Q!!!.
The Secretary-Treasurer distributed a list of the Members of the provincial
Parliament in the area under the jurisdiction of the Authority. The members of the
Executive Committee will advise Mrs. A.C. Deans of the names of the M.P.P's with
whom they will meet to discuss the Report of the Working Group on the Mandate and
Role of the Conservation Authorities of Ontario. Each member should select three
or four M.P.Pls.
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Constellation Hotel Corporation Limited
To undertake construction of two storm sewer outfall~
into the Mimico Creek, north of Dixon Road, east of
Carlingview Drive, Borough of Etobicoke
A staff communication was p~esented advising that an application has been
received from Constellation Hotel Corporation Limited for permission to con-
struct two storm sewer outfalls into the Mimico Creek at the above location.
Res. '410 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Constellation Hotel Corporation Limi~ed, be received; and
THAT the application of Constellation Hotel Corporation Limited for permission
to construct two storm sewer outfalls on Lot 22, Concession III, Mimico Creek
watershed, be approved, subject to:
(a) All areas disturbed due to construction being restored to the satisfaction
of the Authority and of the Borough of Etobi.c'oke Parks Department,
-7- 8-316
(b) All approvals being received from the Borough of Etobicoke as may be
required,
(c) Every effort being made to minimize silting of the creek during
construction.
CARRIED,
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Samuel Sarick Limited
To place fill on the flood plain of the Mimico Creek,
Part Lot 2, Block 'E', Registered Plan 919, City of
Mississauga
A staff communication was presented advising that an application has been
received from Samuel Sarick Limited for permission to undertake the above-
noted works.
Res. .411 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of Samuel
Sarick Limited, be received, and
THAT the application of Samuel Sarick Limited for permission to place fill on
the flood plain of the Mimico Creek on Lot Pt. 2, Block 'E', Registered Plan
919, City of Mississauga (Mimico Creek watershed), be approved, subject to:. .
(a) The .cut and fill" principle being employed,
(b) All surplus excavated material being removed from the site,
(c) Site grading being in accordance with a detailed site plan which will
show existing and proposed grades and the finished floo~ elevation of
the building;
(d) Every effort being made to 'minimize silting of the Mimico Creek during
construction,
(e) All work being completed to the satisfaction of the A~thority and of"
the City of Mississauga. CARRIED,
15. APPLICATION FOR PERMIT UNDER OUTARIO REGULATION 735/73
M. & A. Maziarczyk
To construct an addition to an existing industrial
building on Jarrow Avenue, Part Lots 14 and 15,
Registered Plan 728, City of Mississauga
(Little Etobicoke Creek Watershed)
A staff communication was presented advising that an application has been
received from Martin and Armandina Maziarczyk for permission to construct a
417.21 square meter (4491 square feet) addition to an existing building at the
above location.
Res. 1412 Moved by: Mrs. L. Hancey
S~conded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of Martin
and Armandina Maziarczyk, be received, and
THAT the application of Martin and Armandina Maziarczyk for permission to
construct an addition to an industrial building on Pt. Lot 14 and Lot 15, R.P.
728, City of Mississauga (Little Etobicoke,Creek watershed), be approved,
subject to:
(a) All excess fill being removed from the site immediately after completion
of construction;
(b) All work being carried out in accordance with Drawings lA, 2A, 3A and 4A,
as prepared by Wislaw M. Wodkiewicz and dated May 5, 1979.
CARRIED,
.
S-317 -8'-
16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Elson Miles
To bqild a dam and create a pond.on Part Lot 28,
Concession 5, Town of Markham (Rouge River Watershed)
A staff communication was presented advising that an "application has been
received from Mr. Elson Miles for permission to build an earth fill dam at the
above location.
Res. '413 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of Elson
Miles, be received, and
THAT the application of Elson Miles for permission to build a dam and create a
pond on Part of Lot 28, Concession 5, Town of Markham (Rouge River watershed)
be approved, subject to:
(a) All work being completed in accordance with plan t28-12-69 and an
unnumbered site plan, both prepared by Ralph Gregg of the Agricultural
Engineering Service, Ontario Ministry of Agriculture and Food, which
shall form part of the permitJ
(b) Every effort being made to minimize silting of the watercourse during
I construction.
CARRIED,
17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
N.H.D. Developments Limited
To construct a storm sewer outfall into the Etobicoke
Creek in the vicinity of Dixie and Derry Roads, City of
Mississauga
A staff communication was presented advising that an application has been
received from N.H.D. Developments Limited for permission to construct a storm
sewer outfall, to include an energy dissipator, gabion breakwall, sodded
9hannel and rip-rapp~ outlet at the above location.
Res. 1414 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of N.B.D.
Developments Limited, be receivedJ and
THAT the application of N.H.D. Developments Limited for permission to construct
a storm sewer outfall on Lot 10, Concession 3, E.H.S., City of Mississauga
(Etobicoke Creek watershed), be approved, subject to:
.All work being completed in compliance with engineering drawings DET-1,
D3 and 6 as prepared by R.E. Winter and Associates Limited, and dated
July, 1979.
CARRIED,
18. WATERFRONT PROJECT 1977-1981,
pickering/Ajax Sector
-Prope~ty: Durham Board of Education
Res. iUS Moved by: E.H. Card
Seconded by: J.S. Scott
RESOLVED THAT: The Report (September 20, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purcha~e.
CARRIED,
liRe: project: Waterfront project 1977-1981
Pickering/~jax Sector
Authority: Executive Resolution No.460, Meeting No.23 -
January 21, 1976 and Authority Resolution
No.46, Meeting No.3 - April 9, 1976
Subject Property: North side of Lakeview Boulevard
Owner: Durham Board of Education
-9- B-318
Area to be acquired: 2.160 acres, more or less
Recommended Purchase Price: Nominal consideration of $2.00, plus
Vendor's legal costs
"Included' in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being All of Block "B", Registered Plan 285, Town of
Ajax, The Regional Municipality of Durham, fronting on the north side of
Lakeview Boulevard, east of Pickering Beach Road.
"Situated on the property is a one-storey school building.
"Negotiations have been conducted with officials of the School Board and,
subject to the approval of your committee, agreement has been reached with
respect to a purchase price, as follows:
The purChase price is to be the nominal consideration of $2.00, plus
Vendors' legal costs, with date of completing the transaction to be
as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive a conveyance of the
land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Ministry of Natural Resources for an ;
Inspection Certificate."
19. WATER AND RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control & Slope Stabilization in The Regional Municipality
of York: Proposed remedial work - vicinity of the Town of Caledon
and King Township Boundary Line, Cold Creek (Humber River Watershed)
A staff report was presented advising that as outlined in the report "Erosion
Control and Bank Stabilization in The Regional Municipalities of Peel, York and
OurhRm - 1979 Programme", which was approvect by the Executive Committee at
Meeting #15/78, remedial work is proposed in the vicinity of the Town of
Caledon and King Township boundary line.
Res. #416 Moved by: C.F. Kline
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Erosion control work be carried out in the vicinity of the Town
of Caledon and King Township boundary line, Cold Creek (Humber River watershed) ,
at an estimated cost of $9,300.00; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
20. INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT 1979-1981
-Proposed Monitoring Programme: Slope Instability at Nos.
10-14 Bruce Farm Drive, City of North York (Don River
Watershed)
A staff report was presented advising that the Authority is in receipt of a
proposal from the firm Golder Associates to carry out the above-noted monitoring
programme.
Res. #417 Moved by: Mrs. F. Gell
. Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates,
Consulting Geotechnical Engineers, to carry out a slope instability monitoring
programme at the rear of Nos. 10-14 Bruce Farm Drive, City of North York (Don
River watershed), at a cost estimated to be $4,750.00.
CARRIED;
21. ONTARIO MUSEUM ASSOCIATION: GIFT SHOP OPERATIONS SEMINAR
OCTOBER 31-NOVEMBER 1, 1979, HOLIDAY INN, BARRIE, ONTARIO
-Attendance at
A staff communication was presented advising that the Ontario Museum Association
is holding a seminar covering museum, gift shop operations at the Holiday Inn,
Barrie, Ontario, October 31-November 1, 1979.
B-319 -la-
Res. #418 Moved by: E.H. Card
Seconded by: J.S. Scott
RESOLVED THAT: Mr. N. Elliott, Superintendent of Operations, and Mr. R.
Roncadin, Manager of the Gift Shop at the Black Creek Pioneer Village, be
authorized to attend the Ontaro Museum Association Seminar to be" held in Barrie,
Ontario, October 31st-November 1st, 1979; and
THAT their expenses, in the estimated ~ount of $130.00 each, be paid.
CARRIED;
22. CITY OF NORTH YORK
-Request for Permanent Easement:
Black Creek Valley, north of Finch Avenue
A staff communication was presented advising that a request has been received
from the City of North York to provide a permanent easement for storm and
sanitary sewers required for a development east of the Black Creek valley,
north of Finch Avenue.
The proposed easement affects Authority-owned land known as Part of Lot 22,
Concession IV, W.Y.S., City of North York (The Municipality of Metropolitan
Toront) .
Res. #419 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
i
RESOLVED THAT: A permanent easement be granted to the City of North York,
required for storm and sanitary sewers for a development east of the Black
Creek valley, north of Finch Avenue. Said easement is shown as Part 1, Plan
64R-7911. The Authority-owned land affected is Part of Lot 22, Concession IV,
W.Y.S., City of North York, The Municipality of Metropolitan Toronto. Said
easement to be granted for the nominal consideration of $2.00, subject to the
City of North York being responsible for carrying out and paying all legal,
survey and other costs involved in the transaction; and
BE IT FURTHER RESOLVED THAT: The appropriate Authority official~ be
authorized and directed to sign the necessary documents to give effect thereto.
CARRIED;
23. THE MUNICIPALITY OF METROPOLITAN TORONTO
-Policy for Appointments to Boards and Commissions
The Secretary-Treasurer presented a letter and report received from the
Metropolitan Toronto Clerk regarding a proposed policy with respect to
candidates for appointments to Boards, Commissions, etc., advising that this
correspondence had been forwarded to all citizen appointees by Metropolitan
Toronto to the Authority, suggesting that they respond directly.
Res. #420 Moved by: E.V. Kolb
Seconded by: C.r. Kline
RESOLVED THAT: The communication of the Secretary-Treasurer, together with
the letter and report received from the Metropolitan Toronto Clerk, having
regard to a proposed policy with respect to candidates for appointments to
Boards, Commissions, etc., be received for information.
CARRIED,
24. ADMINISTRATIVE STAFF COMMITTEE OF THE ONTARIO CONSERVATION AUTHORITIES,
PROFESSIONAL DEVELOPMENT SEMINAR: NOVEMBER 15-18, 1979, LESLIE M.
. FROST NATURE CENTRE, DORSET, ONTARIO
-Attendance at
The Secretary-Treasurer presented a communication advising that the
Administrative Staff Committee has been authorized by the Committee of Chairmen
of the Conservation Authorities of Ontario to hold the above-noted seminar, and
that The Metropolitan Toronto and Region Conservation Authority has been asked
to make a presentation on Data Processing, Programme Budgeting and Zero Base"
Budgeting.
. Res. #421 Moved by: C.F. Kline
Seconded by: E.H. Card
RESOLVED THAT: Messrs. K.G. Higgs, Secretary-Treasurer, and G. Dudar, Finance
Administrator, be authorized to attend the Professional Development Seminar,
-11- B-320
sponsored by the Administrative Staff Committee of the Ontario Conservation
Authorities, to be "held at the Leslie Frost Nature Centre, Dorset, Ontario,
from November 15 to 18, 1979; and
THAT their fees in connection therewith, in the amount of $125.00 each, be
paid.
CARRIED,
25. ALBION HILLS CONSERVATION AREA
-Quotation #79-49: Camp Supervisor's Office/Residence:
Lumber Supply
A staff communication was presented advising that at Meeting #12/79, the
Executive Committee considered tenders for the construction of the Camp
Supervisor's office/residence at the Albion Hills Conservation Area. The
staff has delayed awarding the contract to allow time to determine the
feasibility of carrying out the project on the basis of hiring hourly-waged
carpenters to construct the building, with the Authority to acquire the
necessary building materials.
The following quotations have been received for the supply and delivery of
construction material:
Supplier Price incl. F.S.T.
No. 1 Construction Grade Spruce
Cadillac Building Products Company $3,000.34
Card Building Supplies Limited $2,994.06
Custom Lumber $2,520.93
Plywood
Cadillac Building Products Company $1,067.00
Card Building Supplies Limited $1,045.50
Custom Lumber $ 927.56
Exterior Siding - Pine (approx. 1700 s.f.)
Cadillac Building Products Company $2,219.66
Card Building Supplies Limited $1,200.00
CUstom Lumber $1,989.00
Res. #422 Moved by: E.V. Kolb
Seconded by: F.R. Perkins
RESOLVED THAT: The. staff be authorized to proceed with the construction of the
Albion Hills Conservation Area Camp Supervisor's Office/Residence, utilizing
its own work forces, sub-contractors - where necessary - with the Authority to
supply all materials; and
THAT the quotation received from Custom Lumber for the supply and delivery of
No.1 Construction Grade Spruce, in the sum of $2,520.93, F.S.T. included; the
quotation received from Custom Lumber for the supply and delivery of plywood,
in the sum of $927.56, F.S.T. included, and the quotation received from Card
Building Supplies Limited for the supply and delivery of 1700 square feet of
Pine Boston Channel Siding, in the sum of $1,200.00, F.S.T. included, be
accepted; these being the lowest quotations received. CARRIED,
NEW BUSINESS
26. HURRICANE HAZEL TWENTY-FIFTH ANNIVERSARY SEMINAR
-City Hall, Toronto: October 3, 1979
Dr. Leith presented a verbal report on the Hurricane Hazel Twenty-Fifth
Anniversary Seminar held in the Council Chamber, City Hall, Toronto, on
Wednesday, October 3, 1979.
Res. #423 Moved by: Dr. T.H. Leith
Seco~ded by: C.F. Kline
RESOLVED THAT: Appreciation be expressed to all p~rticipants in the Hurricane
Hazel ~enty-Fifth Anniversary Seminar, held in the Council Chamber, City Hall,
Toronto, on Wednesday, October 3, 1979, which was considered an outstanding
success.
CARRIED,
B-321 -12-
27. HIGHWAY #427 EXTENSION
The staff reported on their attendance at a meeting of the Council of The
Regional Municipality of Peel in connection with road proposals for the
Highway #427 Extension in the vicinity of the Claireville Dam and Reservoir.
The Committee was advised that the Authority is in receipt of correspondence
from the Clerk of The Regional Municipality of Peel advising that Regional
Council will be dealing with this matter again on Thursday, November 8, 1979.
28. ADJOURNMENT
On Motion, the Meeting adjourned at 1:00 p.m., Thursday, October 4.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
.
.
B-322
SCHEDULE nA"
.' THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
FINANCE SUB-COMMITTEE
REjPORT #5/79
The Finance Sub-Committee met at the Authority Office, 5 Shore ham
Drive, DOWNSVIEW, Ontario, on Tuesday, September 25, 1979, commencing
at 1:30 p.m.
PRESENT WERE
Chairman J. S. Scott
Members E. H. Card
Mrs. J. A. Gardner
C. F. Kline
Authority Chairman R. G. Henderson
Authority Vice-Chairman Mrs. F. Gell
Secretary-Treasurer K. G. Higgs
Director of Planning & Policy W. A. McLean
Administrator - Finance G. Dudar
Administrator - Information & Education T. Barber
Administrator - Cons. Land Man. P. Flood
Administrator - Water Resource M. Garrett
Administrator - Historical Sites R. Cooper
Administrator - Property & Admin. w. Jones
ABSENT MEMBER
Member M. W. H. Biggar
The following items were discussed:-
1) 1980 Preliminary Budget Estimates;
2) 1981-1984 Multi-Year Forecast;
3) Amendment to Ontario Regulation #845/77;
IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS:
1) 1980 PRELIMINARY BUDGET ESTIMATES
THAT the 1980 Preliminary Budget Estimates, as amended and
appended to this report as Appendix 1, be approved.
2) 1981-1984 MULTI-YEAR FORECAST
THAT the 1981-1984 Multi-Year Forecast, as amended and
appended to this report as Appendix 2, be approved.
3) AMENDMENT TO ONTARIO REGULATION #845/77
THAT Ontario Regulation #845/77, regulation made under the
Conservation Authorities Act, as amended and appended as
Appendix 3, to be effective January 1, 1980, be approved.
J. S. Scott, Chairman K. G. Higgs, Secretary-Treasurer
:wr
1979.09.26.
B-323
,TO: The Chairman and Members of the Finance Sub-Committee, M.T.R.C.A.
Meeting #5/79, Tuesday-September-25-l979-l:30-p.m.
FROM: Mr. W.A. McLean, Director, Planning and Policy
RE: 1980 PRELIMINARY BUDGET ESTIMATES AND 1981-1984 MULTI-YEAR FORECAST
The 1980 Preliminary Budget Estimates and the 1981-1984 Multi-Year Forecast
have been forwarded to the members of the Finance Sub-Committee for consideration
at their Meeting #5/79 to be held on Tuesday, September 25, 1979 at 1:30 p.m.
at the Authority Office, 5 Shoreham Drive, Downsview.
1980 PRELIMINARY BUDGET ESTIMATES
The budget estimates have been prepared in accordance with the criteria for
budget preparation adopted by the Executive Committee at its Meeting '8/79
held June 13, 1979.
Each Division prepared its budget estimates in accordance with these criteria
and the budget has been assembled and reviewed using the same criteria.
The criteria established by the Executive Committee as they relate to the order
of priority of Authority programs are as follows:
A) 1. Studies required to complete the Water~hed Pl~n.
2. Established programs, projects and activities which contribute
directly to water and related land management objectives, to prevent
loss of life and minimize property damage from flooding and erosion,
consistent with social, economic and environmental considerations.
3. Legal obligations and fixed costs where no reasonable alternative
exists.
Al Watershed Plan Studies
A2 Flood Control Works Scheduled
A2 Land Acquisition Flood Control
A2 Flood Warning System
A2 Regulation Administration .
A2 Erosion Contro.l
A2 Operations & Maintenance - Water Control Structures
A2 Conservation Services
A2 Shoreline Management
A3 Administration
A3 General Qperations - Insurance
Office Cleaning
Office Maintenance
Rent , Utilities (C5)
A3 Taxes Non Revenue , Insurance
The preliminary budget provides for the funding of these components as per
approved projects or estimated costs for 1980.
B) 1. Conserve natural resources of regional significance.
2. Manage lands to produce ancillary resource and recreation benefits.
B2 Operations , Maintenance - Conservation Areas
Conservation Field Centres
General Information
Pioneer Life
Black Creek Tours
Kortright Centre
Pioneer Village
B2 community Relations Support - Conservation Information
Conservation Education
. B2 Conservation Areas Support
B2 Waterfront Support
B2 Waterfront Development
B2 Headwater Acquisition
Since Headwater acquisition is presently provided for in the Interim Water
and Related Land Mpnagement Project it is funded in the A category but in the
same amount as 1979. The 1980 budget provides for the remaining programs at
either the same level as last year or with an 8~ 'increase in levy plus
additional funds from user fee increases and program activities.
B-32 4
Finance Sub-Committee, M.T.R.C.A.
Meeting #5/79
1980 Preliminary Budget Estimates and 1981-1984 Multi-Year Forecast Page 2 .
Exceptions - provision is made for $19,000 for exhibits including
the C. N . E. Exhibit
- an additional secretary for the Land Management Division
$11,000
- Waterfront as per approved project.
C) Extending or establishing new programs which contribute directly to primary
objectives.
C Waterfront Supplementary Project $.950,000
C Flood Control - Keating Channel $100,000
C Conservation Services - Forestry
Development $ 22,000
These items are funded in projects which the Authority has adopted, but in
the case of the Supplementary Waterfront Project and the Keating Channel,
Provincial approval has not been given.
The Supplementary Project and fores~ry development are considered
established items for which administrative cost provision now exists.
Administrative costs have been calculated as being 10% over and above
program costs. The introduction of the Keating Channel project represents
a new venture which will add to administrative costs at the approximate
rate of 2% per year for a period of five years. No provision has been made
in the Administrative budget for this.
D) Extending or establishing new programs which contribute to ancillary
objectives.
D Community Relations Development - Field Centres
(Lake St. George) $ 100,000
- Kortright $ 359,000
0 Conservation Areas Development - $ 126,500
D Historic Sites Development - $ 46,000
0 Land Acquisition Conservation Areas - Not funded
0 Head Office - $ 10,000
D Aquatic Park - $ 50,000
D Organizational Review Study - $ 50,000
D C.N.E. Exhibit - $ 19,000
The programs which are funded as indicated have no increase in levy over
1979. The Lake St. George Field Centre is funded from school board funds.
Head Office renovation is funded from special revenues.
With the exception of head office renovation costs, all programs in this
category are considered to add to overall administration costs. These
would accumulate at the approximate rate of 2i per year over a five year
period.
1981-1984 MULTI-YEAR FORECAST
The Multi-Year Forecast is based on the 1980 Preliminary Budget.Estimates and
projects program costs beyond the termination dates of presently approved
projects. Since projects have not yet been'developed beyond 1981, the forecasts
made,represent the best estimate which can be made at this time,of the funding
that programs which are being developed will require. The forecast continues
to reflect an emphasis on water and related land management programs.
SCHEDULE OF FEES
Attached to the Preliminary Budget Estimates for 1980 is the recommended
schedule of fees for 1980. The amendments to the. fee schedul~ directly affect
the revenue estimates. The major changes are as follows:
. Conservation Area parking fee increased from $2.00 to $2.50 per car per day
. Annual Conservation Area parking permit increased from $25.00 to $30.00
per year
B-325
Finance Sub-Committee, M.T.R.C.A.
Meeting #5/79
1980 Preliminary Budget Estimates and 1981-1984 Multi-Year ~orecast Page 3
. Permit fee for use of Glen Haffy,Extension increased from $70.00 to $80.00
per. day
. Entrance fees at Black Creek Pioneer Village:
Adults - increased from $3.00 to $3.50 per day
Students - increased from 75~ to $1.00 per day
Family
Admission - increased from $6.00 to $7.00 per day
Group
Admissions - increased from $2.50 to $3.00 per person
. Row boat rentals at Glen Haffy increased from $2.00 to $3.00 per hour
. Canoe rentals increased from $3.00 to $3.50 per hour and from $10.00 to
$15.00 per day
. Canoe instruction $35.00 per course per person (new)
. For Campground Site - Indian Line increased from $6.00 to $7.00 per night
. Weddings at Black Creek Church increased from $125.00 to $175.00
. Pioneer Craft Program and Christmas Tour increased from $2.00 to $2.50 per
student
. Dickson Hill School Program increased from $1.00 to $1.25 per student
. Group Cross-Country Ski instruction and equipment rental $5.50, per day per
person (new)
. Ski Tow increased from $2.00 to $3.00 per day
. Conservation Education Program:
Albion Hills Conservation Field Centre increased from $495.00 to $535.00 per
day
Claremont Conservation Field Centre increased from $495.00 to $535.00 per day
Boyd Conservation Field Centre increased from $380.00 to $405.00 per day
Lake St. George - $405.00 per day (new)
RECOMMENDATION:
IT IS RECOMMENDED THAT the 1980 Preliminary Budget Estimates and the 1981 -
1984 Multi-Year Forecast be approved and,
IT IS FURTHER RECOMMENDED THAT Ontario Regulation 845/77, Regulation made under
The Conservation Authorities Act, as amende~ to be effective January 1, 1980
be adopted.
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
PRE L I M I N A R Y
1 9 8 0 BUD GET EST I MAT E S
OCTOBER 3, 1979
~
:z:
tIJ
g
t"'
tIJ lIJ
I
II W
lIJ ~
II en
THE r~ROPOlITAN TORONTO AND REGION CONSERVATION AUTHORITY
1980 PRElIr1HIARY BUDGET
I N D E X
PAGE(S) PAGE(S)
1 - 3 Budget Report CONSERVATION & RECREATION LAND MANAGEMENT
4 Budget Summary
5 Municipal Levies 35 - 36 Conservation Areas - Support
6 , Basis of Apportionment of Municipal Levies 37 - 38b Conservation Areas - Development
39 - 40 Conservation & Niagara Escarpment Land
ADMINISTRATION 41 - 42 Information & Interpretive Program
43 - 44 Rent & Utilities
7 - 8 Administration 45 - 46 Taxes & Insuranc~
OPERATIONS & MAINTENANCE WATERFRONT
9 - 10 General Operations 47 - 48 Waterfront Support
11-12 Conservation Area Operations
13 - 14 Information & Education Operations SPECIAL PROJECTS
15 - 16 Black Creek Pioneer Village
49 - 50 Waterfront Plan
WATER & RELATED LAND MANAGEMENT
HISTORIC SITES
17 - 18 Operations & Maintenance of Water Control Structures
19 - 20 Community Relations - Support 51 - 52 Historic Sites Development
21 - 22 Community Relations - Development
23 - 24 Taxes & Insurance FEE SCHEDULE
WATER & RELATED LAND MANAGEMENT Appendix I Proposed Schedule of Fees for 1980
25 - 32 Interim Project
33 - 34 Interim Project - Supplementary - Keating Channel
1 9 8 0 1.
PRELIMINARY
CURRENT AND CAPITAL BUDGET ESTIMATES
AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES
The Metropolitan Toronto and Region Conservation Authority has adopted a program designed to further the conservation,
restoration, development and management Qf the natural resources of the 1,339 square miles included in the Authority's
area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the
headwater areas of the Oak Ridges intcrlobate moraine, and the Niagara Escarpment as the major resources to which its
programs are applied.
Established resource management programs include flood control and water conservation, erosion control, waterfront devel-
opment, and fish and wildlife management. In implementing these programs, 26,534 acres of land have been acquired and,
in addition to their being managed for the conservation functions they perform, they are made available to the community
for outdoor and conservation education, recreation and historic sites purposes.
Within these comprehensive program guidelines, the Authority has, over the years, reflected the priorities and policies
of the partners, the participating municipalities and the Province of Ontario as expressed through ~he representative
Authority members. Since 1957, 61% of the Authority's capital and development budget has been devoted to Water and
Related Land Management, 25% has been devoted to Lake Ontario Shoreline Management, 12% to Conservation and Recreation
Land Management and 2% to Outdoor and Conservation Education.
The 1980 budget estimates for administration, operations and maintenance, current and capital programs reflect the emphasis
on Flood Control and Water Conservation, provide for the management of lands and facilities acquired and developed in
connection with this program, and continue the approved Waterfront project at a reduced rate.
FORMAT OF PRESENTATION
These budget estimates are in accordance with the requirements of The Ministry of Natural Resources "Policy, Procedure and
Information Manual for Conservation Authorities".
There are five major types of Provincial grants available through the Ministry of Natural Resources to Conservation
Authorities:-
1) Administration 4) Special Projects and Programs
2) Water & Related Land Management 5) Supplementary Grants (not applicable to M.T.R.C.A.)
3) Conservation & Recreation Land Management
, AUTHORITY PROGRA1'fS 2.
The Authority Programs in these Preliminary Budget Estimates are in seven basic categories:-
1) Administration 4) Conservation & Recreation Land Management
Administration a) Conservation Areas - Support
b) Conservation Areas - Development
2) Operations & Maintenance c) Cons. Area Information & Interp. Program
d) Rent & Utility Services
a) General Operations e) Taxes & Insurance
b) Conservation Area Operations
c) Information & Education Operations 5) Waterfront
d) Black Creek Pioneer Village Operations
Waterfront - Support
3) Water & Related Land Management
a) Operations & Maintenance of Water Control Structures 6) Special Projects
b) Community Relations - Support Waterfront Plan
c) Community Relations - Development
d) Taxes & Insurance 7) Historic Sites
e) Interim Water & Related Land Man.-Current & Capital
f) Interim Water & Related Lal'ld-.Man.-Keating Channel Histo~ic Sites Development
Expenditures on administration, ope~atlons and maintenance and current programs comprise the Authority's General Levy on
all participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario.
Expenditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in the specif-
ic projects.
INTERIM WATER & RELATED LAND MANAGElmNT PROJECT
The year 1980 is the second year of the three year Interim Water & Related Land Management Project. This project enables
the Authority to establish and undertake a program designed to conserve, restore, develop and manage the natural resources
of the watersheds within the area of its jurisdiction. in accordance with the Water and Related Land Management Plan.
It is the intention that this Project. together with ongoing works which were initiated under earlier approved projects.
shall form a single. consolidated Project.
Originally the Project provided for total expenditures of $3,800,000 in each of the three year 1979, 1980 and 1981. Due to
cash flow limitations from the Province. the 1979 budget provided for expenditures of $3.598.963 and the attached prelimin-
ary budget provides for expenditures of $3,692,800.
WATERFRONT PROJECT 3.
In 1977, the Authority commenced the second phase of the Waterfront Project. Originally this phase proposed expenditures
of $4,400,000 per year over the five year period 1977-1981.
Expenditures for 1977 were $2.876,482 and in 1978 $11,486,993 (including $8,500,000 for the acquisition of the Guild Inn).
Metropolitan Toronto agreed to increase their share of the levy for this project by $496,000 each year for 1979, 1980 and
1981. Due to cash flow limitations from the Province, the $496,000 matching grant was not available in 1979. The 1980
preliminary budget provides for estimated expenditures of $2,138,250 plus $992,000 for the supplementary project. In ,
addition. it is proposed to levy an amount of ~185,408 in 1980 to cover deficit in levy for the years 1977, 1978 and 1979.
This amount is within the project authorization.
THE 1980 LEVY
The preliminary apportionment of the 1980 municipal levies is based on the latest equalized assessment figures available
to the Authority (1977 assessment data for 1978 taxation purposes) as supplied by the Province of Ontario. These pre-
liminary apportionments are subject to revision when current figures are available from the Province-
In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied
an amount equal to 100% of the 1979 taxes paid by the Authority for revenue producing conservation areas within those
municipalities. Within Metropolitan Toronto, Authority lands are not subject to taxation. (For preliminary budget purposes
the 1979 taxes have been estimated, based on 1978 taxes, plus 9%).
PROVINCIAL FUNDING
The Provincial grant structure used in these estimates is:- Administration 50%
Water & Related Land Management 55%
Conservation & Recreation Land Management 50%
Waterfront Plan 50%
The estimates provide for the following increases (decreases) in Provincial Grant:-
Administration: 8% over the 1979 grant plus additional grant ($25,000) for Phase II of the Management Study.
Water & Related Land Mana~ement: Increases of $80,608 to cover increased costs in the general Water and Land Management
activities, ~23,155 for t e Interim Water & Related Land Management Plan and $55,000 for the dredging of the Keating
Channel.
Conservation & Recreation Land Mana ement: An increase of $23,480 to cover increased costs. (This includes the Water-
ront Support .
Waterfront Plan: An increase to $1,565.125, which includes $496,000 for the supplementary project. (Net increase is
~165,125).
1980
PRELl MINARY
BUDGET, SUMMARY 4.
I --- 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ( 1978 ACTUALS I
, I
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENJITURES I REVENUES
EXPENDITURES GRANT LEVY
[_.. __ - _____ , I
~I.~~~l~ :~~~'R'\T I,(~ ; I, ' I
Administration 1,499,160 70,000 1,429,160 714,580 714,580 I - 1.347,000 I 70,000 II 1,244.548 I 91,379!
I 'I I I ,I,!
1" ..., "'" ~ .. , ,'" , . :' ! I I
~: :,l.,,-! In~~.0~.Ij'o; 1J..~.\:l:I.I.. I i I
(;,'l\e1'al0pc'rations 1111,200 16,500 I 99,700 - 89,700 16,000 112,000 I 10,500 146,875 I 7U,9114 i
Cllnscn'ation I\rea Operations I,C,96.1100 982,335 713,665 I - 713,(,65 - 1,370,800 710,000 1,268,713 753,50,1 I
\' CllRUnunity Rel;ltions Ii Education 1,100,400 989,235 111,165 25,000 79,165 7,000 859,000 757,700 764,036 627,069
Rlack Cn'eJ.. Pioneer Village 1,032,900 888,900 144,000 72,000 72,000 - 88!l,OOO i511,OOO 877,8lO i 77:;,2% I
Ii 3,945,500 2,876,970 1,068,530 97 ,~OO 954,530 I 17,000 3,230,1100 12,2:';4, :!l10 3,057,434 12,224,913
I~:\TER Ii RELATEIJ LA:"oJlJ ~1:\NAl;E~IENT ,I I
I I I
lOp. Ii Mntc. of I~.C. Structures' 209,940 - 209,940 115,467 94,473 - 184,000 I - Ibll,739 i - .
Community Relations - Support 278,120 - 278,120 152,966 125,154 - 239,000 - I 238,108 I -
Conllnanit)' Relations - Development 459,000 - 459,000 41,800 34,200 383,000 I 471,194 - II 206,6'HI i -
Taxes Ii Insurance 279,500 - 279,500 153,725 125,775 - '198,000 - 199,341 I -
1,226,560 - 1,226,560 463,958 379,602 383,000 1,092,194 - 864,837 -
INTERnl PROJECT
I~ater Control Projects 117,350 - 117,350 64,543 52,8Q7 - 92,500 I - I 84,472 -
Regulations 199,640 - 199,640 109,802 89,838 - 182,500 I - 156,599 I -
I
Conservation Services 258,950 62,500 196,450 108,047 88,403 - 208,000 15,000 77,259 13,583
All Benefiting 1,471,560 - 1,471,560 809,358 662,202 - 1,339,273 - 2,772,757 -
Benefiting ~funicipa1iti~s 1,645,300 40,300 1,605,000 882,750 722,250 - 1,776,690 27,000 1,007,021 22,469
3,692,800 102,800 3,590,000 1,974,500 1,615,500 - 3,598,963 42,000 4,098,108 36,052
KI':;,TItI(,; CHANNEL r ! ]
.-- -
K.,.ltinq Cham..'l 100,000 - 100,000 55,000 45,000 - - - - -
.
CONS. & RECREATION LAND MANAGEMENT I
Conservation Areas - Support 170,750 - 170,750 85,375 85,375 - I 143,500 - 126,235 ! - ;
I
Conservation Areas - Development 126,500 - ! 126,500 63,250 63,250 - 126,500 - I 217,264 I -
Conservation Areas - Development 23,000 23,000 - - - - 66,000 I 66,000 I - I - i
I I
Cons. & Niagara Escarpment Land - - - - - - 48,f>01l - I 449,712 I -
I I I I
Informntion & Interpretive 22,680 - 22,680 11,340 11,340 - 21,000 - 21,2% -
I I I
R..mt & Utilities 43,280 - 43,280 21,640 21,640 - 39 , 000 - ,6, '>03 -
Tax0s & Insurance 78,000 - 78,000 39,000 39,000 , - 70,000 - i I (.H.: 78 -
I ,
,
464,210 23,000 441,210 220,605 220,605 - 514,800 66,000 919.188 I -
I I
WATERFRONT I I :
I
lol,tterfront - Support 71,750 - 71,750 35,875 35,875 - 66,000 - 58,889 I -
Ii
Wdtcrfront - Capital 3,130,250 - 3,130,250 1,565,125 1,565,125 2,800,000 ! 111'4&6'993 i
- - I -
1I1S'l'OIUC SITES
--- I
Historic Sites Development 46,000 - 46,000 - - 46,000 60,000 - 51,557 - !
I i
,
I
I
Total Current 7,753,680 3,032,470 4,721,210 1,772,918 2,502,292 446,000 6,763,794 2,385,200 6,514,783 2,329,875
I
Total Capital 6,422,550 40,300 6,382,250 3,353,725 3,028,525 - 5,945,963 27,000 15,266,771 22,469
14,176,230 3,072,770 11,103,460 5,126,643 5,530,817 446,000 12,709,757 2,412,200 21,781,554 2,352,344
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 5.
COMPUTATION OF 1980 LEVIES
GENERAL PROJECTS - INTERIM WATER lie RELATED LAND MANAGEMENT PROJECT - lolATERFRONT
1 980 LEV Y (1) 1979 INTERIM WATER & RELATED PROJECT Waterfront
Before Tax 2 Total Incl. Total Incl. Capital Capital , Special Plan
Tax Adjust. Adjustment( ) Tax Adjust. Tax Adjust Current All Ben. Ben. '~Iun. Total Keating 1977-1981
$ $ $ $ $ $ $ $ $ $
Adjala 212 - 212 190 19 66 - 85 - 44
Durham 35,245 46,365 81,610 74,165 3,080 10,879 11,250 25,209 - 18,367
Metro Toronto 1,850,300 - 1,850,300 1,660,497 170,411 601,886 472,500 1,244,797 45,000 1,679,542 (3)
Mono 206 - 206 185 19 66 - 85 - 40
Peel 143,311 76,060 219,371 198,392 12,509 44,183 45,000 101,692 - 24,795
York 124,903 28,590 153,493 138,321 11 ,062 39,070 193,500 243,632 - 27,745
2,154,177 151,015 2,305,192 2,071,750 197,100 696,150 722,250 1,615,500 45,000 1 750 533(4)
'. '
(1) The 1980 Levy is based on the latest equalized assessment figures available to the Authority (1977 assessment data for 1978 taxation
purposes). These figures are subject to revision when current figures are available from the Province.
(2) Tax adjustment is based on 1979 plus 9\ (per W.E.J.).
(3) Includes $496,000 for supplementary project.
(4) Includes $185,408 for deficit in levies from previous years.
BASIS OF APPORTIONMENT - MUNICIPAL LEVY 6.
BASED ON THE LATEST EQUALIZED ASSESSMENT FIGURES AVAILABLE TO THE AUTHORITY
(19// ASSt:SSMt:Nl UATA l' Ul{ 1!1 /is TAXAT!UN PURPOSt:S)
Total ~ of Equalized Population
Equalized Municipality Assessment Total In
Municipality Assessment In Authority In Authority Population Authority
l,OOO's of $'s 1,000's of $'s
Ad,jala Township 41,103 8 3,288 3,494 279
Durham. Re~ional Municipality of 699,621 * 546,880 64,603 51,197
~etropolitan Toronto 28,710,379 100 28,710,379 2,147,852 2,147,852
Mono Township 63,984 5 3,199 3,856 192
Peel. Regional Municipality of 5,298,268 * 2,223,697 401~ 300 171,853
York. Re~ional Municipality of 2,293,334 * 1,938,075 154,674 124,925
37,106,689 33,425,518 2,775,779 2,496,298
ANALYSIS OF REGIONAL MUNICIPALITIES
Durham, Regional Municipality of 218,262
Ajax Town 86 187,705 22,318 19,193
Pickerin~ Town 352,261 95 334,647 31,541 29,963
Ux~ridge Town 129,098 19 24,528 10,744 2,041
699,621 546,880 64,603 51,197
Peel, Regional MuniCipality of
Brampton. City of 1,373,229 63 865,134 114,290 72,002
Mississauga, City of 3,637.307 33 1,200,311 263,652 87,005
Caledon Town 287,732 55 158,252 23,358 12,846
5,298,268 2,223,697 401,300 171,853
York, Regional Municipality of 151,625
Aurora Town 4 6,065 14,703 588
Markham Town 880,432 100 880,432 59,204 59.204
Richmond Hill Town 412,203 99 408,080 35,150 34",798
Vaughan Town 481,122 100 481,122 18,308 18,308
Whi~church-Stouffville Town 160,087 43 68,837 13,044 5,608
King Township 207,865 45 93,539 14,265 6,419
2,293,334 1,938,075 154,674 124,925
* NOT AVAILABLE IN TOTAL
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Administration PAGE 7.
PURPOSE: To provide the administrative and financial services of the Authority.
,
1980 OBJECTIVES: The continuation of general administration and financial support services for all Authority programs. Salaries
of senior administrative staff and associated secretarial, Administrators, the Finance Division and Property
and Administrati~n Division, are charged to this program together with employee benefits for all employees.
FUNDING: This is a shared program, 50\ of the (unds being available fr~m the Province of Ontario and the balance being
funded from the General Levy on all participating municipalitles.
FINANCIAL COt-L\IENTS: The budget estimates include:-
- an increase in salaries & wages of 8\ for an economic adjustment and provision for merit increases, where applicable
- provision of $50,000 for Phase II of the Management Study
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Employee Supplies & Real Services Financial
& Wages Benefits Utilities Equipment Property & Rents Taxes Expenses Total
- -
621,610 460,500 172,250 - - 244.700 100 - 1.499.160
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM A.lmi II i st ,'at i 011 PAGE R.
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURl:'S REVENUES
EXPENDITURES GRANT LEVY ~
I
Salaries 621,610 - 621,610 310,805 310,805 I - 5bO,150 - 530,900 -
Employee Benefits 460,500 '" 460,500 230,250 230,250, - 44tJ,500 - 399,301 -
Travel Expenses 98,000 - 98,000 49,000 49,000 I - 97,500 - 87,093 -
[llllipmcnt l'urdwse & Renta 36,400 - 36,400 18,200 18,200 - 36,000 - 25,358 -
~lateri:lls & Supplies 89,600 - 89,600 44,800 44,800 - 81,500 - 72,843 -
Rent & Utility Services 82,650 - 82,650 41,325 41,325 - 77,250 - 78,344 -
General Expenses 60,400 70,000 (9,600) (4,800) (4,800) - 54,100 70,000 50,709 91,379
~Ianagement Study 50,000 - 50,000 25,000 25,000 - - - - -
I
I
,
I
.
: TOTAL )( 1.499.160 I 70,000 11,429.160 )( .714.580 I 714,580 I - )( 1,347,000 I 70.000 )( 1.244.548 I 91,379)
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operat ions and "laintenance - General_ Operations PAGE 9.
PURPOSE: To provide administative support services, for which a Provincial Grant is not available.
1980 OBJECTIVES: - to fund the maintenance of revenue producing properties and other general maintenance
- to fund the public liability insurance on vehicles and equipment
- to fund renovations to the Head Office Administration Building
- to fund the office cleaning and maintenance
- to fund the Authority's share of vehicles and equipment
FUNDING: Program revenues, the General Levy on all participating municipalities and Authority funds.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
- 27,500 5,000 - 83,700 - - 116,200
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operations to Maintenance - t.;eneral Operations PAGE 10,
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVEtl:UES
EXPENDITURES GRANT LEVY
,
IRental Property ~Iainten-
ance - Revenue Producing
Prop~rtics to General
~Ia i ntenance 27,500 16.500 11,000 - 11 ,000 - 32,500 16,500 32,388 21,194
Vehicle (, Equip. Suspense 5,000 - 5,000 - 5,000 - 5,000 - 19,358 -
r n su ranee 12,85Q - 12,850 - 12.850 - 12,000 - 8,839 -
lIead Office Renovations 10,000 - 10,000 - - 10,000 10,000 - 26,<>02 -
F Innd Cont ['01 ''lorkshop 2.000 - 2.000 - 2 ,000 - 1,500 - 1,088 -
Office Cleaning 20,300 - 20,300 - 20,300 - 19,000 - 15,317 -
Office Maintenance 38,550 - 38,550 - 38.550 - 32,000 - 43.283 -
Bank Interest - Non-Capital I
Programs - - - - - - - - - 49,790 ;
I
I
( )( 116,200 I I )( . I I 10,000 )( I 16.500 )( I )
TOTAL 16.500 99.700 - 89.700 112,000 146.875 70,984
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operations and Maintenance - Conservation Area Operations PAGE 11.
PURPOSE: The conservation and management of lands under the jurisdiction of the Authority and the provision of outdoor
recreation opportunities.
1980 OBJECTIVES: - the management and operation of 18,000 acres of Authority lands including 13 conservation areas, which will
provide 1.5 million user days of recreation
- provide for the same level of maintenance of services as in previous years, reflecting continued budget
limitations. Selective use and management of Authority lands is required to maximize use and minimize costs.
- to provide self-supporting visitor services
FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial Grant is available for
this program.
FINANCIAL C~~ENTS: In 1980. projected program revenues have been estimated to be considerably higher than 1979, reflecting increases
in fee program revenues.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& l'lages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ , $
1.040.900 385.320 127.550 - 18,850 123.380 - 1.696.000
PRELIMINARY
1980 CURRENT BUDGET 'ESTIMATES
PROGRAM Operations & Maintenance - Conservation Areas PAGE 1?
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
EXPENDITURES GRANT LEVY
Albion IIills 275,850 192,035 83,815 - 83,815 - 233,000 140,400 226,187 148,631
Boyd 151,400 108,500 42,900 - 42,900 - 137,000 82,600 120,833 89,969
Bruce's Mill 224,600 166,800 57,800 - 57,800 - 161,000 114,100 133,983 104,380
Claremont 56,650 18,800 37,850 - 37,850 - 50,000 11,000 43,991 15,271
Claireville 248,050 187,800 60,250 - 60,250 - 179,000 ' 127,200 . 198,807 132,307
Cold Creek 130,950 69,400 61,550 - 61,550 - 92,000 42,300 86,61~ 53,343
Glen lIaffy 96,850 33,200 63,650 - 63,650 - 84,500 26,700 68,690 25,151
Greenwood 115,900 32,900 83,000 - 83,000 - 103,000 22,400 82,409 26,746
1I~'rt Lake 150,250 82,400 67,850 - 67,850 - 129,500 67,700 96,458 68,410
lIumber Trails 10,200 1,800 8,400 - 8,400 - 9,000 1,500 6,957 1,760 .
.
~Ii llle - - - - - - 7,800 7,800 33,520 17,300 ;
Pal~rave 14,150 .7,000 7,150 - 7,150 - 9,000 9,000 19,284 758
Service Area 21,400 - 21,400 - 21,400 - 17,000 - 13,533 -
Woodbridge 9,100 - 9,100 - 9,100 - 8,000 - 6,900 -
Petticoat Creek 190,650 81,700 108,950 - .108,950 - 151,000 57,300 121,931 61,958
Visitors Services - - - . - - - - 8,614 I 7,580
I
I
( )( 1,696,000 I I )( . I 713,665 I )( 1,370,800 I )( 1,268,713 I 753,564 ,)
TarAL 982,335 713,665 - - 710,000
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operations & Maintenance - Community Relations - Information & Education Operations PAGE }3.
PURPOSE: To provide an outdoor and conservation education program for school students and other community groups at five
Conservation Field Centres and a variety of outdoor and conservation education opportunities for the general
public an~ school groups at the Kortright Centre for Conservation and at the Black Creek Pioneer Village.
1980 OBJECTIVES: - a continuation of the program at the same level of service as in 1979 for existing facilities
- to provide an outdoor and conservation education program for the following estimated number of students
and adults:-
Black Creek Pioneer Village 64 , 000
Conservation Field Centres 18,500
Albion Hills Conservation Farm 9,000
Maple Syrup Days 31,000
Special Days, Field Trips, Claireville Dam Tours etc... 12,000
Kortright Centre for Conservation 50,000
FUNDING: Program revenues and the General Levy on all participating municipalities. A surplus or deficit on the operations
of the Boyd Conservation field Centre and Lake St. George Conservation Field Centre will, be agreement, be charged
or credited to the participating boards of education. A grant of $25,000 from the Provincial Ministry of Culture
and Recreation is estimated for the operation of the Kortright Centre for Conservation and $7,000 from The
Metropolitan Toronto and Region Conservation Foundation Kortright Centre Growth Endowment Fund.
FINANCIAL CO~IloIENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures. The net eost to
the municipalities is estimates at $79,165.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Se'rvices Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
594,800 175,600 60,000 - 270,000 - - 1,100,400
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operatjon~ and Maintenan.:e - Conununity Relations - Information & Education Operations PAGE 14.
1980 BUDGET SOURCES OF FINANCING ~- 1979 BUDGET 1978 ACTUALS 1
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES
- EXPENDITURES GRANT LEVY
Albion Hills C.F.C. 158,000 158,000 - - - - 147,500 147,500 126,035 131,793
Boyd C.F.C. 180,000 180,000 - - - - 167,000 167,000 165,597 165,597
Claremont C.F,C. 158,000 158,000 - - - - 151,500 151,500 146,151 146,099 ,
Cold Creek C.F.C. 37,000 37,000 - - - - 36,500 36,500 38,(,71 37,134
I.ake St. George C.F.C. -I 180,000 180,000 - - - - 68,500 68,500 - -
-II 68,000 68,000 - - - - - - - -
General Interpretive Pro. 11 ,000 11 ,000 - - - - 10,500 10,500 21,372 10,929
B.C.P.V. Pioneer Life 38,550 26,000 12,550 - 12,550 - 37,500 24,500 37,835 I 23,870
B.C.P.V. Tours 77 ,ISO 42,000 35,150 - 35,150 - 73,000 39,700 70,770 31,814
Kortright 192.700 129,235 63,465 25,000 31,465 7,000 167,000 112,000 93,711 25,826 I
I
Fann Conversion - - - - - - - - 63,894 54,007
l
I
I
TOTAL )( 1,100,400 I 989,235 I 111,165 )( 25,000 I 79,165 I 7,000 )( 859,000 I 757,700 )( 764,036 I 627,069 )
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Operations and ~Iaintenance - Black Creek Pioneer Village.. PAGE 15.
PURPOSE: To provide a 1 iving portrayal of a crossroads vi llage in pre-confederation Ontario.
1980 OBJECTIVES: - to continue the' effective operation of this heritage conservation project within financial constraints
- to accommodate in excess of 300,000 visitors
- to maintain the Village's heritage structures within financial constraints
FU:-mING: ~lajoT funding comes from gate receipts and sales outlets. It is anticipated that the Authority will match grants
from the Min i stry of CuI ture & RecTeat ion with levy funds. Additional funds arc expected each year from the
Foundation as the Black Creek Growth Endowment Fund continues to expand,
FINANCIAL CO~~lENTS: Additional revenue results from increase in admission fees and the optimizing of revenue from all Village trades
and facil i ties. Due to budget constraints. it will not be possible to open the Dominion Carriage Works. Taylor
Cooperage and Sawyer's House as planned.
OBJECTiVE ClASSIFICATIONS: ~Iaterials
Salaries Supplies & Real Services Financial
& I~ages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
667,500 318.900 10.000 - 32.500 4.000 - 1.032.900
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Ope rat ions & ~Ia intenance - Black Creek Pioneer Vi llage PAGE 16.
r 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ~978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPEr~DITURES REVENUES EXPE.'JDITURES REVENLJES
~- EXPENDITURES GRANT L.EVY
Administration 188,000 - 188,000 - 188,000 - 178,000 - 180,064 -
Rui Iding Staff etc... 434,600 - 434,600 72 ,000 362,600 - 338,600 - 272,353 -
Food Facilities 19,500 - 19,500 - 19,500 - - - - -
(;a te lIouse 18,300 - 18,300 - 18,300 - 16,500 - I 12,080 -
i
Gi ft Shop 141,8{)0 - 141,800 - 141,800 - 122,600 - 1,7,988 -
Livestock 59,000 - 59,000 - 59,000 - 55,500 - 54,094 -
~Iaintenance - Buildings 35,500 - 35,500 - 35,500 - 64,000 - 53 , 136 -
~Ia in tenance - Grounds 39, 100 - 39, 100 - 39,100 - 49,300 - 56,492 I -
Promotion & Publications 17,300 - 17,300 - 17,300 - 13,000 - 9,070 -
Registrar 36,800 - 36,800 . - 36,800 - 21,500 - 32,003 - I
Revenue Activities 23,700 - 23,700 - 23,700 - 11,600 - 14,095 - I
I
Securi ty 19,300 - 19,300 - 19,300 - 18,400 - 16,435 -
Admission Receipts - 490,000 (490,000) - (490,000) - - 405,000 - 434,322
Endowment Interest - 14,000 (14,000) - (14,000) - - 10,000 - (170)
Food Serv i'ces 45,000 (45,000) (45,000) I
- - - - 40,000 - I 38,595
Revenue Activities - 28,500 (28,500) - (28,500) - - 18,000 - 14,493
Rentals & Miscellaneous - 8,000 (8,000) - (8,000') - - 2,000 - 9,079
Sales Outlets - 303,400 (303,400) - (303,400) - - 275,000 - 276,977
( TOTAL ) ( 1,032,900 I 888,900 I 144,000 )( 72 , 000 I 72,000 I - )( 889,000 I 750,000 )( 877,810 I 773,296 )
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Water & Related Land Management - Operations & Maintenance of W.C. Structures (N5) PAGE 17.
PURPOSE: To maintain Flood Control works established under the Authority's plan for Flood Control and Water Conservation
as well as under the various Downstream Erosion Control programs.
1980 OBJECTIVES: - contin~ation of the Regular Maintenance of the Flood Control Works at a level comparable with 1979
- major maintenance to be carried out at Milne Dam, Black Creek Channel
- non-destructive testing of gate hoist cables at C1airevi11e Dam
FU:-mING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being
funded from the General Levy on all participating municipalities.
FINJ\NCIAL CO~~lENTS: Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major
maintenance.
OB.JECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
-
$ $ $ $ $ $ $ $
72,000 60,000 - - 77 , 940 - - 209,940
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM ~ater & Related Land Contl"ol Structllrc-; I\! 5 PAGE 1R.
1980 BUDGET SOURCES OF rlNANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEf\:UES EXPEND!TuRES REVENUES
EXPENDITURES GRANT LEVY
rlood \'iam ing System 24,000 - 24 , 000 13,200 10,ROO - 18,000 - 12,488 -
Claireville Dam 31,905 - 31,905 17,548 14,357 - 23,000 - 26,871 -
~Ii lnc [)am 5,000 - 5,000 2,750 2,250 - 4,000 - 5,054 -
(;. Ross Lord Dam 24,730 - 24,730 13,601 11,129 - 23,000 - 19,868 -
Sma 11 Dams (;CllC 1'a I 4,000 - 4,000 2,200 1,800 - ~,OOO - J ,RI8 -
~Iood Control Channels 65,305 - 65,305 35,918 29,387 - 75,00D - 75,225 -
Erosion Control 5,000 - 5,000 2,750 2,250 - 4,000 - 1,462 -
"fajor ~laintenance 50,000 - 50,000 27,500 22,500 - 34,000 - 17,953 -
I I
I
I
;
I
!
,
f
j
( TOTAL )( 209,940 I - I 209,940 )( 115,467 I 94,473 I - )( 184,000 I - )( 160,739 I - ~
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM l~ater {; Related Land ~lanagement - Community Relations (Support) (WlO) PAGE 19.
PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information, community and staff
relat ions :md Olltdoor and COl1servat ion program.
1980 OIlJECTIVES: _ to provide Information, pllblicatlons, tours and official openings of projects, photographic coverage, mOVie
prints of eXlsting films and exhibits relatin~ to water and land management aspects of the Authority program
_ provision has been made for the funding of a .N.E. Exhibit
HJ~[)IN(;: This is a shared program, 55~. of the funds being available from the Province of Ontario and the balance being
funded from the General Levy on all participating municipalities.
OBJECTIVE CLASSIFICATIONS: ~Ia t eria 1 s
Salaries Supplies & Real Services Financial
& Wages Ut il ities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
231,595 46,525 - - - - - 278,120
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Watcr f, Rclated Land ~lanal:l'mcnt Community Rclations (Sllpport) (WIO) P,\GE 20.
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEf\:UES EXPENDITURES REVENUES
EXPENDITURES GRANT LEVY
CO:-;S[:RVAT 10:\ I Nr:OR~IATION
Staff Salaries 64 ,200 - 64,200 35,310 28,890 - 57,735 - 50,853 -
Staff Travcl f, Expcnses 2,000 - 2,000 1,100 900 - 2,000 - 2,132 -
Publ ications f, Printing 13,325 - 13,325 7,329 5,996 - 12,500 - 20,281 -
Tours f. Special Days 3,200 - 3,200 1,760 1,440 - 4,U15 - 1,167 -
Photographic SupplIes 3,000 - 3,000 1,650 1,350 - 3,250 - 3,685 -
I
~Iot ion Picture Program 3,000 - 3,000 1,650 1,350 - 4,000 - - -
Exhibits 20,000 - 20,000 11 ,000 9,000 - 1,000 - 8,348 -
Promotional Contingency 1,000 - 1,000 550 450 - 1,000 - - -
I
;
CO:-\Si:lWATlON EDUCATION
Staff Salal'lc~ 58,770 - 58,770 32,323 26,447 - 53,500 - 49 , 134 -
Staff Travel f, Expcnses 1,000 - 1,000 550 450 - 1,000 - 1,066 -
Education Supervisors 108,625 - 108,625 59,744 48,881 - 99,000 - 98,334 -
Part Timc Staff - - - - - - - - 3,108 -
I
I
( )( I I )( . I I )( 239,000 I )( I )
TOTAL 278,120 - 278,120 1~2,966 125,154 - - 238,108 -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM _I~ater ~ _R:,~te~,~~~~_ ~Ianagement - Comlll~ni:L.~e~a_tions (Ucve,I,opmentJ. ~IO)___. _______ -- .-.----- PAGE 21.
PURPOSE: To develop the facilities required for the Authority's Outdoor and Consl'!"vation EducatIon Prop'ams.
1980 OIi.JECTIVES: - the development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation
- the development of additional indoor exhibits, fUl"I1ishings and c'llllpment for the Kortright Ccntr~ for Conservat.lon
- to complete the construction and development of the Lake St. George Conservati.on Field Centre (Stage 11)
FUNDING: For th.: developmcnt of thc Kortright Ccntrc (Area nevelopmc.:nt), 55~b of tho funding is from tht: PrOVInce of Ontario,
the Balance of 45% from the General Levy on all participating muniC.lpalities.
For the Exhibit Program, $200,000 is dependent on funds from The ~Ietropolitan Toronto and Region Conservation
Foundation and from IHntario, with the balance of $83,000 proposed to be spent from the 1979 approved funding
from the Foundation and Wintario.
For the construction and development of Lake St. George (Stage II), funding will be obtained from the eight partici-
pating school boards, by agreement.
OIUECTlVE CLASS I FICATIONS: ~Iaterials
Salaries Supplies & Real Serviccs Fi nancial
& I~agcs Ut il i ties Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
180,000 209,000 - - 70,000 - - 459,000
P.RELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Ivater Ii 1{C'latct!_l.andl~.!!:!.g,'m"nt - Cummunity' Relations (U~'vdo)lmcntLmQ,L ------------ PAGE ??
-- -- SOURceS OF FINANCING J~979 ""nCtT ~ 1~T97il ACTUALS~
1--- 1980 BUDGET
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL- '~MUNICIPAL OTHER EXPENDITURES~VENUES EXPENDIT~;;~EN'JES
-.--- - -- . -, ~- EXPENDITURES GRANT LEVY _ _ ~_ ---
---1 ; I . I
Bllyd hh..:at iOIl C'"I1j1":X - - - - I _ i-I - i - ! ~14 ,786 i-I
A I b i on II i II s C. F . C . - - - _ _ -, 7,000! - I - I - I
Lake St. Ceorgc - Stage II 100,000 100,000 I I I
- _ _ 100,000 171,722 I - 778 I - I
Kortright
a) Area Uevclopment 76,000 - 76,000 I . Ii, I .
41,.800 34,200 - 7b,000 -) . i
b) Exhibits, fllrnishin~: I ) 171,085! - ,
and Equipment 283,000 - 283,000 - - 283,000 216,472 - ) I i
I
, I
,
I
I I
, I
!
: !
I
!
I
,
I
,
( TOTAL )( 459,000 I - I 459,000 )( 41,800 I 34.200 I 383,000 )( 471,194 I - )( 266,649 I - )
-
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM I~ater & Related Land ~Ianagcment - Taxes and hlSUl'ancc (1\'11 ) PAGE _~ '
---" --- ._--
PURPOSE: To provide for co~ts a~sociated with taxes on non-revenue produdng areas and liability insur;mce on Authority
lands undcr I~ater and Related Land Managcment Programs.
FUNDINt;: Thi~ is ,a shar\:' program, 55q. of the funds heing ;l\"ailahl~ from the Province of Ontario and the bal;lIlce being
funded from thc General Levy on all participating muni..:'l'allta,s.
FI NANC 1 M. CO~I~'ENTS: Using a basc rate of $241,000 for 1979, an inflation figure of 7~. has becn addcd and an additional propertics
figure of 5%, bringing the estimated spending for taxes in this account for 1980 to an amount of $270,000.
No allowance has been made fOT market value aSSessment increases in 1980.
OB.JECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financi a1
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
- - - - 9,500 270,000 - 279,500
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM \\atel' I. Rc1atC'd La 11 ,I :.lanagefl1ellt - T:lXes and lnsur:lnc:c (\~ll) P;'G E 24.
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET. 1978 ,-\CTU..'..LS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXPENDITURES REVENUES
EXPENDITURES GRANT LEVY
I axes, 11011'- revenue 270,000 - 270,000 148,500 121,500 - 189,000 - 190,073 -
(nSll ranc:e 9,500 - 9,500 5,225 4,275 - 9,000 - 9,268 - I
1 I
I \
I
I
I
I .
! I
I
;
,
I
I
I
,
i
I
I
[ TOTAL )( 279,500 I - I 279,500 )( 153,725 I 125,775 I - )( 198,000 I - )( 199,341 I - )
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
?ROGRAril \\'att'r {I Hl'l:ltl.d I..llh! ~1:111.1:',",1."-'I,t - Int~ 1'1-'1 Pl~~.t_ '1I1Il,':I~:l. ~_~II~l~!lt_ I',~~~_-- P:.'::;E _25.__
( 1980 BUDGET (- SOURCES-CF-FINAtJCING r-~7-9 BUDGi::T ---.. ( 1978 ;"CTL'.:'.LS
ACTIVITY NET PROV::-.JCIAL MUNIC:P,:,L I i 'XPENOITVe" I I
EXPEr-.:DITURCS REVENUES or H ER EXPENDITURES REVEf\:UES RE\'E;,.)::S I
EXPENDITURES GRANT LEVY ;
!
i
I I
W.e. Projects 117,350 - 117,350 64 ,543 I 52,807 - 92,500 - I R,l,.J72
I
Ik;:L:lations J99,MO - 199,640 109,802 89,838 - 182,500 - I 150,50~ i 1
Conservation Services 258,950 62,500 196,450 108,047 88,403 208,000 15,000 77,259 I 1';,583 I
- I
I
I I i
11,471,5bO I
,\i 1 Bel~efiting - 1,471,560 809,358 662,202 - ! 1,339,273 - 2,772,757 - I
Benef i t i ng ~hlll ic I pa 11 ties \1,645.300 40,300 1,605,000 882,750 722,250 - 1,776,690 27,000 1,007,021 I 22,409 I
I !
I I
.
:
I
I I
I I
1 I I
I I
I
i I
I
I
.
l I j
I
TOT AL )0,692,800 I 102,800 I 3,590,000 )( 1:974,500 11,615,500 I - )( 3,598,963 I 42,000 )( 4,098,1081 36,052 )
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM I~aler " Related Land_ :.lan~gL'~ent._.:..-.!-"tl!.rim ~~'~~~__Currcn~_::..~~2), llHJ ~_~~~~ ~ ll~~_ __ __ ___ _ PAGE. ~_
PURPOSE: To pruvide the required funding for carrying out the objcctives of the InteLIU l~atcl' and Rdat.:J Land ~lan;,g':llIcnt
Project.
1980 OB.JF.CTIVES: - to provide funding for the continued update of the Authority's radio systcm and flood warning s)'stcn.
_ the administrat ion and cnfon:ement of water managciDent rq~1I1;lt ion and development review fun,.t l..ln Indlldll1g
enforcement. office!":';' salaries and support costs
_ to carry out resourcc management practices on Authority lands and to provide Conservation Assistance Programs
for pri vate lando\oo11crs
FUNDING: This is a shared program, 55\ of.the funds being available from the Province of Ontario and the balance being
funded from the (;eneral Levy on all participating municipalitics.
OIJ.JECTIVE CLASSIFICATIONS: ~Iaterials
Salaries Suppplies & Real Services Financial
& Wagcs Utilities Equipment Property & Rents Taxes Expenscs Total
$ $ $ $ $ $ $ $
308,740 156,500 23,000 - 87,700 - - 575,940
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROG~AM 1~;ltl'r I, Rl:latl'd I..,;,,! ~1.':I:I>':l'I:!l~l1t - lll'~'l'illl I'rO)l'ct l:lIl'J'dlt \\ater ~Int:.\ L.~\"1i. .l.!!.=.J..___ - -_.-_.~-- ?:'G~ ,_.-1lt..---
~ 1980 BUQGET (-1(P-9--~i:6GE7----"(-T9::-s ':'C --:1 ~ "\
I-- .1.-__ '"" .. ----:. - I &- _L.._~
ACTIVITY 'i E.XPENDi"URES! REVE:-;~ES ii EXPEND;TLlR~S! REVE,~J:JES .
I
!
I EXPENDiTURES . REVEt>:UES EXPEN~TiuRES 'I I II . ,
Sr,IFf S:.larics I 91,350 - I 91,350 50,243 I {lS /SOO I _ 45 -,1 - I
I , i ' . I !~ -,- I
Staff l'ra\'el 3,000 - I 3,000 1,650 1,350 ! .- 3,7lHl I - I. -,hl.
Flood Contn,l Stnactu\'cs - - I - - - I - I I 9,8!'-9 - r
I - -
I I I
Sa fety Stat ions - - - - - - - l!l\j - I
I I I
. II
Mi Inc Study - - - - I - I - - - 1,500 I - I
, I ,
I i ! i
FI(l~d I\arning System ,
, I 1,350 I I I I i
Ra.l io 3,000 - 3,000 1,050 I - 15,000 - 17,50~ I - j
. I I
Telcmarks 20,000 - 20,000 11 , 000 9,000 I - 8,000 - 7,3b5 -
Flood Control Centre - - - - - - - - 968 I -
Ii I .
I I !
.
i
I II I !
I; I !
, I I
I I I I
i
I I I
I i I I I
I
I I I I
. I
I
I
.
i
I
( )( I I 117,350 )( . 64,543 I 52,807 I )[ 92,500 I )( 84 ,472 I )
T<YTAL 117,350 - - - -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM \\;It.'r i. Ik:at~'d 1.."..1 ~lall;lI:cml.'lIt - Interim l'r011.'ct C\ll"l:,'!..!!..-:..-.l\al~'r ~1~!!.!l.:~'::!~L-!h~!~' ~J PAGE __ 2~
----- v.
)( 1980 BUDGET '\( SOURCES-O~NCING~Ir-19i9- BlJDGET---"I( 1978 ;'.C7U.:"LS "'
ACTIV ITV II ExPE.IlITUnES REvENUES EXPEN~\iuRES Ii PRg~:t''::+Al ""NL~'C9l i OT" ER : ~ EX',"OITURES I REVE""ES Ii EXPEND'TURES i REV'.vES !
II I I I ! ; I ~ I
""Cf '.01."""' I' m."'''' - I ".."'0 I "5."-: ';';.3: - . 104.""". - ': "'.'''. I - :
Staff Travel Ii Exp('nses 4,000 - 4,000 2,200 I 1,800 i-II 4,000 I - Ii 3,715 I - I
,,,fo,',""'"' Of""" s.1. 54,29. - "'.2'0 29.'"'0 24,43. I-i. 48,.00 - ~ "-'.790 I - I
Enfol'cement Officers Veh. 12,000 - 12,000 6,600 5,400 - I 11,500 - I 13,365 I -
I.cgal Fees 5,700 - 5,700 3,135 2,5b5! - I 8,300 - I 4,912 -
Tcchn i cal Plans & ~laps 5,000 5,000 2,750 .l,250 i I; ,
- - 5,000 - I b,i58 - I
! I
I I I, I .
i I I
I " .
I ;
I
,I I
I
i
I
I
I
I
I
l I
( )( I I 199,640 )( . I 89,838 I )[ I )( 156,599 ! )
TOTAL 199,640 - 109,802 - 182,500 - -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROG~AM I\at~'r I, Iklah',( 1.11.\1 ~Ia:l;il:~'meat - IntcJ'im I~ru,k.:~- ':,~_~t~~1I -;, J'\.IC\.... I, I~i\~.rban" II.~:~~,~ ~\:l)_l\\:;l I-':'C:~ ___ll.__ -,--
. r 1980 8UDGET ,r-SOURC"-OT F1NA.icING ' ( - 1~1---=-8- ;- ~-".' . "'
I. 1979 EUDGET ~I ~~J~~L~ .
. , Ii EXPENDITURES I RE:Va.;~ES I
ACTIVITY EXPENDITURES REVENUES I NET i~;;-CIAL- ! MUtl:iCJ;AC-i OTH-R .!EXPE~rnTuRESI REVE~uES
. . I EXPENDITURES GRANT I LEVY Co
I d I II I I
I
Staff SalaJ"ies 34,850 - 34,850 19,1b7 1~.bX:l , - 31 , .lI1:! I - ! I I
'I 1.\ ,850 I -
Staff Travel 2,600 1.430 1,170 I I! .2,000 I I .
.2,600 - - :1 - I! 1,078 I -
r '
Plant Propa):at ion '\0,000 45,000 (5,000) (2,750) I (2,250) - 5,000 I - - -
.1 I - i -
Forc.stry Developmcnt 22,000 - 22,000 1 12,100 I 9,900 I - I' - -
I I
I I I ~
I I
Private l.ands I i
II I
Forestry 43,500 15,000 28,500 15,675 12,825 - I, 33,000 12,000 26,514 I 11,0(;.1 I
,I I I
Stream Improvcment 27,000 2,000 25,000 13,750 11,250 - I' 28,000 I 2,500 I 30,189 I 2,304
Land Usc Planning 5,000 500 4,500 2,475 l,025 ! - 13,600 I 500 I 4,628 215
I I I
.
Authority Lands I ;
I I I
Forest ry 66,000 ,- 66,000 30,300 29,700 i - 05,000 - - I - I
i i
Stream Improvcment 10,000 - 10,000 5,500 4,5011 I - r 20,000 I - - -
I
I.and Managemcnt 8,000 - 8,000 4,400 3,600 - 10,000 - I - - I
i
I
I I
. ,
I
!
I I I
I
I Il I
i I
!
( )( 258,950 L ~ )( . I 88,403 I J[ I 15,000 )( I
TOTAL 196,450 .108,047 - 208,000 77,259 13,~83
PRELIMINARY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM __~~ater & Re1ated_..!-and Ma!,ag,=en~, ~_ In_t~E.~I:I P:'?l.!':.~ Capi ~51.! ,- --..- ._--- .. .- -- --------. PAGE 30,
-,- ,- -
PURPOSE: To provide the funding rel!uired for carrying out thl' obj~'ct iv(,s of the Intcrim I\'ater and Related land ~Ianagl'ment
Project which apply to all municipalities benefitIng :IS well :\:; ,:inglc benefiting lIIunh:i~lalitl~S.
1980 OS.JECr I \'ES: _ to continue the rcvic:w and dcvdopment l)f the ,\ullh';ity'..; !'lolll; Control Plan
_ to .:ontinue vallcylaad ;I.:qulsltion a" well a" I 1Il!'lll.t ant hcad\~ater lands
_ to complete construction of the Stouffville Channel
_ to commence construct ion of the Oak Ridges and l~ilket Creek Cham:el Tr.ljlrovements
_ to continue the UOlmstream Erosion Control Pro}:l'am In the l{cginlls of ~letropol itan Toronto, Peel, York anJ Durh.llll
FUNDING: This is a shared program, 55% of the funds beinl\ available from the Province of Ontario and the balance being
funded from the General Levy on all participating municipalities.
.
The Interim Project as indicated encompasses both genera11)' benefiting and specifically benefitill~ mun.l.cipality
projects. The projects are listed under the appropriate heading. The municipal share in both cases is 45% of
the costs.
OB.JECTIVE C1.ASSI FICATIONS: Materials
Salaries Supplics & Rcal Sen: ices Financial
& Wages Utilities Equipment Property & Rcnts Taxes Expcnses Total
$ S $ $ $ $ $ $
530,000 538,300 - 1,048,560 1,000,000 - - 3,110,860
PRELl rvlll\JAkY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM Il'a:cr t; lk1at~! 1.:1l1d \iallagl?,:;\.'l1t - Interll,l Pro.1c-:t.~ .ill Rellefitlll.L.._ .___ PAGE 31. -,
1980 BUDGET ( SOURCES OF FINANCING r 1979 BUDGET ~~].978 ACTUt\LY
__ ___~~_TIVITY ___ EX~ENDITURES REVEf\;UES! EXPEN~T{URES I PRg~~~~L OTHER ! EXPENDITURES REVENUES I EXPENJI~LJREl--;~~~J:JES :
Ian Review ! 236,000 - 1 230,000 II 129,800 106,200 I - II 397,liOO: - I 29,585: - I
IlVll"llnr.k'nt.1! ~I"nltoring ! 17~,Ono - 1-2,000 I 0.J,hOO 77 "iOO : II iOO,lllll) 15S,t)-2 :
lood Plain ACq~isition II 848,560 - 848,560 I 466,708 I 381,852 - i 682,273 I - 12,249,1>28 I - I
l?:ld"aters AClllllSl t Ion 200,000 - 200,000 110,000! 90,000 - i 160,000 - I - - I
, ' 'I I I i I i
..ll'plng I 10,000 - 10,000 5,500 I 4,500 - II - - I 135,813 - i
Iydrologic ~Iodel II - -! - - I - - II - - i 188,992 I - '
'omr.:unity Infol'mation 'I 5,000 - I 5,000 2,750 I 2,250 - II' - I - : h6S i -
,o,io" lnve",ory ,- I - - - - - - - I 12.599 I - I
I "
I' I
I I
" I .
I I
I
I
I
I
,
,
I
I
I LJ
l
TOTAL )(1,471,560 I - I 1,471,560 )( 809,358 I 662,202 I - )( 1,339,273 I - )( 2,772,757 I - )
PRELl MINARY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM \\,ll"l't; Iklat"d 1,1:,,1 ~!"lla\'('iIlL'llt - Intel'im I'l"l!e..-t - IklWfltllH' ,'J1.!IliI1J)Jlitl~'''__,_- Pt.GE )7._
,( 1980 BUDGET .----SOURCES -OFFlNANCING ,( 1979 BUDGET 111978 A.CTU.-',LS -----j
ACTIVITY If EXPH~DITURES REVENUES EXPEN~T{URES PRg~~~+AL I MU~t~:F;~L I OTHEr< lrEXPENDITURES REV Ei'-:'JE S 11~lTunES I REV::::,'JES I
I !" ,I I
I I : : ~
Ll'lJ,.IOIl (\.ntro1' ,'I I :
~Ictro ,825.000 25,000 800,000 440,000 I 360,000 I - 825,000 25,000 I 559,822 22'469!
I'eel '105,500 5,500 100,000 55,000 45,000 I' - 101,000 1,nOO! - I - :
York 83,300 8,300 75,000 41,250 33,750 - 75,500 500 - -
I ,Illldl'lm, 26.500 1,500 25.000 13,750 I 11,250 i - i 25,500 500 -_ I' - I
II1).:hland Creek (~I) I _ _ - - - - 240,000 - 408,/59 - I
~tollffville (Y) 305,000 - 305,000 167,750 137,250 - 395,000 - 10,234 I - ;
Wilker Creek (~') 250,000 - 250,000 137,500 112,500 - 10,000 - - - I
Oak Ridges (Y) 50,000 - 50,000 27,500 22,500 - 5,000 - 11,600 -
~lcth:lnc Gas Study _ _ - - - I' - - - 1,571 -
, '
\iC-58 - [)Oll River - - I - - - - I 99,690 - 15,035 -
I I 'I
, I I
I . 'I I
I
I
I
!
I
( TOTAL )(1,645,300 I 40,300 11,605,000 )( 88,2,750 I 722,250 I - )(1,776,690 I 27,000 )( 1,007,021 I 22,469
PRELIMINARY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM Water & Related Land Management - Interim Project - Supplementary Project - Keatin2 Channel PAGE 33,
PURPOSE: To provide additional funding for the protection of the Lower Don River area from flooding.
i980 OBJECTIVES: To commence the first of a seven-year dredging program of the Keating Channel on the Lowcr Don River.
FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance
beinlt funded from the ~Iunic~pality of ~letl"OJlo1itan Toronto, it being the desiAnated Bcnefiti.ng ~Iunicipality.
OBJECTIVE CLASSIFICATIO~S: Materials
Salaries Supplies & Real Services Financial
& \~ages Utilities Equipment Property & Rcnts Taxes Expenscs Total
$ $ $ $ $ $ $ $
- - - - 100,000 - - 100,000
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM hate r. t, I{e} atc~ _ Land ~Ianagcmcnt - Supplementary Pn~.iect -._--- -- ----- PAGE ~-
l~ --~ 1980~BiJDGET ~- iOURi:ES'~ 0'-- FINANCING I r....- 1979 ~ B"ij(;Eg~i9 78- ACTUALSm -~ =1
ACTIVITY EXPENDITURES r REVEf\:UES I ~ET PROVINCIAL MUNICIPAL J OTHER :. EXDENDITURES I REVEt'UES EXPENDITUR"'S~f\""'NUt:S.
, EXPENDITURES GRANT LEVY ; .' 'I' ~, ~ I
._ ._,- -- I -- 1 ----;-----:------- i , --- j- - n___ - - I
II I I I' I '
K('at ing Channel Dredging I 100 000 - 100 000; 55 000 45 000 - .1 - I - I - ! - I
II . . ,,' '! II I ! I :
I I ' I 1 :
Ii! ii ii, .
II! I I !
j! I I I;
I I i I
I I '
I
I I I
I
I I, I
I
I ,
I I ,
'I !
I I I
I I
I I
,
i
I
I
( )( 100,000 I I 100,000 )( 55,OO~ 45,000 I )( I J( I .
TOTAL - - - - - -
I -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM ---Eonsc~~ ion_~~~~:.:reat ion I.;,nd ~lanagement . - C()ns~rva~on A~a~_ (Support) (Cl j PAGE ~l)
--.-
PURPOSE: To admini~ter and Jevclop Authority o\~nl::d conservation lands in 3ccurcance ,.~th the Interim Conscrvllt 10.1': and
Recrcat ion I.and \Ianagcmcnt I'lan l1979}.
TlI prov Ide <l comprchens i vc program of mana~emcat ;.nd provi sion of outdoor recreat ion opportun it ies thro:Jgh
facil ity" improvements and master planning of conservation area:..
1980 On.JECTIVES: _ to final i zc the Conservat ion ami Recrcat i on l.and ~Ianagcmcnt .:omponcnt of the I~atersi;ed Plan
- to develop detailed ~laster Plans for Conservat ion Areas
- to administer existing programs and activities
FUNUH\G: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being
fundcd from the General Levy on all participating municipalities.
F r NANC I AL Cm.I.\!E~TS: The 1980 estimates reflect the requirement for additional clerical staff.
OB.JECTlVE CL^SSIFICATJONS ~laterial s
Salaries Supplies & Real Services Financ ial
& I~ages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ S $ $ S $
153,000 7,600 8,150 - 2,000 - - 170,750
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Consen'at ion & Rc.:reat ion Land ~lanal!emcllt - Con:;L'r\'at ion An'a:; l,:i,uppocr..l-L(1) P;.GE 36.
. 1 1980 BUDGET SOURCES OF FINANCING Y 1979 BUDGET r- 1978 ACTUALS ,
ACTIVITY PROV!NCIt.L I MUNICiP;':'" OTWR I! EXPENDITURES REVE",UES I: EXPS'liDliUFES ~EN'JES I
EXPENDITURES I REVENUES EXPEN~TJURES . GRANT LEVY c.
I I i I I
Staff Salaries 150,000 150,000 75,000 75,000 , i
- I - 127,200 - I lO:;.37~
Staff Travel & Expenses 3,600 3,600 1,800 1,800 I 3,240 I 2,0-: I i
- - I - I -
Vehicles 7,150 7,150 3,575 3,575 I 6,500 I
- - I, - I 6,239 -
Pond Se;-vice - - - - - - 6,500 I - I 12,5.17 I -
I I
Wi Idlife & !'ish lIabitat I 10,000 - 10,000 5,000 5,000 - II - - 'I - I - I
I I !
I
I
I'
I ,
I I
.
;
I
I
I I I I
I
I I
! I
I
( TOTAL )( 170,750 I - I 170,750 )( 85,375 I 85,375 I - )( 143,500 I - )( 126,235 I - )
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land ~Ianagement - Conservation Areas (Development) (C1) PAGE )/,
PURPOSE: To provide a wide range of outdoor recreational opportunities requiring the natural resources found on Authority
lands, through the provision of facilities and ground developments in accordance with thc objectivcs, policies,
and concept plans of the proposed Interim Conservation and Recreation Land ~~nagement component of the Watershed
Plan.
1980 OBJECTIVES: _ to continue the development of the C1airevi11e Conscrvation Area including expansion of hydro and water services
to 58 additional campsites and ground developments in the beach area
_ to continue the fish rearing program at the Glen Haffy Conservation Area
_ to continue ground developments at the Cold Creek and Black Creek Conservation Areas
_ to improve services to the visitors at the Bruce's Mill Conservation Area through provision of additional
washroom facilities
_ to provide funds for the development of additional site plans
FU~DING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded
from the General Levy on all participating municipalities.
OBJECTIVE CLASSIFICATIO~S: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ , $ $
35,650 54,250 5,850 - 30,750 - - 126,500
PRELl MINARY
1980 CURRE(\!T BUDGET ESTIMATES
Cons,'!'\'at Ion [, Recl"l'at ion LlIld ~i:IIl:I"c'nll.:n 70
PROGRAM . l) 'Illlll'l " P:"GE :'>0,
1980 BUDGET ( SOURCES OF FINANCING , 1979 BUbGET 1978 .....CTUALS
I
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL I MUNICIPAL OTHER 1 EXPENDITURES REVEf\:UES EXPE.'lDITURES I REV~f\:~ES
EXPENDITURES GRANT LEVY
I I I I, I
I Albion Hills - - - - I - 750 \ - \i 40,400 - I 17,377 -
R l.ld Crcek 1,500 - 1,500 750 I - 1,000 I - 4,949 -
I Royd - - - - I 12 ~ 500 I - - - 16,155 -
Ilm(:(,'5 ~lil1 25,000 - 25,000 12,500 I - 8,600 - 15,864 -
C 1 :, . rev i II e 79,O()() - 79,000 39,500 39,500 I - 3,300 - 73,b27 I -
CIa rCI:lOn t - - - 'I - I _ I - 11 - - 6,201 I -
I (old Cred, 4,000 - 4,000 2,000 2,000 i - 38,000 - I 18,1>41 I -
I; I en lIa ffy 9,000 - 9,000 4,500 4,500 - 8,500 - 18,914 I -
Greenwood - - - - - - 3,~OO - 4, ~J,17 -
l"e:1 rt I.ake - - - - - - 5,500 - 16,648 -
I
IOak Ridges - - - - - - - - I 3,724 -
Pl'tt ico:lt Creek - ' - - - - - I 8,000 - 15,121 -
Clen ~lajor - - - - - , - - - 2,541 -
Lake St. (;eorge - - - - - I ! 2,555
- - - -
i Studies etc... 5,000 - 5,000 2,500 2,500 - 10,000 - - -
General Development 3,000 - 3,000 1,500 1,500 - - - - ! ' -
~1i 1 ne - - - - - - - - - -
I
.
r )( I I )( . I 63,250 I )( I )( I
TOTAL 126,500 - 126,500 63,250 - 126,500 - 217,264 -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Reereation Land Managerr~nt - Conservation Areas (Development) (Cll PAGE 38A
PURPOSE: To undertake special projects ineluding:-
_ the improvement of the cold water fishery on the Duffin Creek in aecordance with a Federal/Provincial strategic
planning for Ontario Fisheries Program recommendations
_ the rehabilitation of the South Thackeray Landfill Site in accordance with the approved plan
1980 OBJECTIVES: _ to finalize the strategic planning for Ontario Fisheries Program
_ to install plant material for the seeond year on the rehabilitation program for the Thackeray Landfill Site
FUNDING: The Ministry of Natural Resources have allocated to the Authority a total of $51,000 for addit~onal stream enhancement
work to be carried out on private, public and Authority owned lands. $3,000 of this total sum is alloeated for the
1980 Budget.
FINANCIAL CO~~NTS: A funding for these two programs will be carried by The Ministry of Natural Resources and the Corporation of the
Municipality ot Metropolitan Toronto and will not reflect in the Levies or the provincial Funding for M.T.R.C.A. Programs
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
11 , 000 7,000 1,000 - 4,000 - - 23,000
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Reercdtion Land Hanagemcnt - Conscrvation Areas (Devclopmcnt) (Cl) PAGE 38B
~ 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPEt-.:DITURES REVENUES
EXPENDITURES GRANT LEVY
I I
I Special Projects I
i Strategic Planning for !
: Ontario Fisheries 3,000 3,000 - - - - 48,000 48,000 - I -
I Thackeray Landfill
I
. Site Revegetation 20,000 20,000 - - - - I 18,000 18,000
I - I -
I I
i I
I I
i
I .
I
I ,
I
,
I
I
i
,
( TOTAL )( 23,000 I 23,000 I - )( - I - I - )( 66,000 I 66,000 )( - I - )
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation li Recreation Land ~lanagement - Conservation & Niagara Escarpment Land (C2) PAGE ~9.
PURPOSE: To acquire Conservation Area and Niagara Escarpment Lands as set out in the Authority's plan for ancillary conser-
vation measures and Niagara Escarpment Land acquisition. The purpose of such acquisitions is to bring into
public o~nership environmentally important lands such as source areas, headwater zone river valleys and Oak
Ridges interlobate moraine lands.
1980 OB.JECI'IVES: There 1S no provision in the 1980 budget estimates to acquire any land under the program.
FUNDfNC: This is a shared program, a 50% grant on Niagara Escarpment lands and Conservation lands is available from the
Province of Ontario, the balance being funded from the General Levy on all participating municipalit\es or funds
which may be ~,de available through The Metropolitan Toronto and Region Conservation Foundation or through funds
raised through Authority revenues.
FINANCIAL CO~~IENTS: Funding priorities preclude the allocation of grant aided funds to enable acquisitions under this program in 1980.
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation PAGE 40.
f J 1980 BUDGET SOURCES OF FINANCING )( 1979 BUDGET If 1978 ACTUALS
ACTIVITY 'XPENDITURES ! R'V'NU'S EXPEN~iJURES PRg~lt',WL MUN~'i:'t~L I DTH'R !EXPENOITURES I REV"UES , EXPENDITURES i REVENUES
I I . i I r I
:-;iagara Escarpment Land _ _ _ - - I - I - - 18,801 I - :
Co"o,,"'oo Area Laod _ _ - - - I - I 48,800 - 430,911 I - I
I I I
I I
II' I I !
I :
I
,
I
!
r TOTAL )( - I - I - )(. - I - I - )l 48,800 I - )( 449,712 I -
.
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conservation & Recreation Land ~L~nagement - Conservation Arc a Information & Intcrpretive (C3) PAGE 41,
PURPOSE: To provide information and interpretivl: programs related to recreation and land m:ma;:cli:cnt in the Authority's'
fourteen consen'at ion areas.
1980 OaJECTIVES: To continue the programs carricd out in 1979.
FUND[~G: 111i s is a shared program, 50'. of thc funds being available from the Province of Ontario and the b:llancc be' i:1g
funded from thc Gencral Levy on all part icipat ing municipali tics.
Materials [
OBJECTIVE CLASSIFICATIONS:
Salaries Supplies & Real Services financial
& Wagcs Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
12,320 3.460 - - 6,900 - - 22,680
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM ConsL'!'\':1tion I; Reel'catlon L:1I111 ~lana"L'ment - COI1Scn:lth'n ,.rea II~f()I'J:I.ltIOI1 I, InterpretIve (C:>) Pf.GE 1.47.
1 1980 BUDGET SOURCES OF-j::INANCING~ ( 1979 BUDGET r- 1978 ACTUALS 1
PROV!NCIAL -j MUNICiPAL I I! EXPENDITuRES I REVEf\;UES ,
ACTIVITY OTHER i EXPEN!XIU"ES I REVENUES I
EXP!::t.:CITURE..$ REVENUES EXPEN~T{URES GRANT ' LEVY I' I
I I I " I I I
I
'ita ff Sa I ari cs 12,320 12,320 6,160 6,1l>0 I , I
- - Ii 11 . 100 I - 10,470 -
Publications I, Printing 4,500 j' I
4,500 - 2,250 2,250 I - 3,000 I - I 3.2ll0 I -
Tours f, Special Days 2,300 - 2,300 1,150 1,150 - il 2,000 - 1,511 -
Photographic Supplies ,i 2,560 I 2,560 1,280 1,280 ! II 2,900 I 3,822
- - - -
!I , I
I ! j
~Iot ion Picture I'rogrnnl Ii 1,000 - 1,000 500 500 - il 2,000 - 2,293 - !
" i
I !
I ,
I
I
;
I
I
I
I
I I
I
!
( )( I I )( . I I )( I )( I )
TOTAL 22,680 - 22,680 11 ,340 11,340 - 21,000 - 2!-,296 -
,
PRELIMINARY
1980 CURRENT BUDGET ESTIMP:fES
PROGRAM Conscrvat ion & Recrcat ion Land ~Ianagcment - Rcnt & Util ity Servcics (C5) PAGE 43.
PURPOSE: Provision of administration of the Central Serviccs :md Stores.
1980 OBJECTIVES: _ the prpvision of stock supplies, including purchasing and distribution
_ the provision of building and mechanical trades service to all Divisions of the Authority as required
FlI:-JO [r\G: This is a sharcd program, 50% of the funds being available from the Province of Ontario and the balance being
funded from the General Levy on all participating municipalit ies.
f I N.\~CI,\L CO~l~IENTS: Adjustrr.ent for 1980 idenifies the realignment of existing staff salaries.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expens es Total
$ $ $ $ $ S $ $
39,880 - - - 3,400 - - 43,280
PRELl MINARY
1980 CURRENT BUDGET 'ESTIMATES
?ROGRAM COllsen":lt ion [, Rent f Utility Servi~cs C5' P.^.GE 44.
~ 1980 BUDGET , T r SOURCIES." ~F ~IN~NCING l( 1979 BUDGET 1978 ,;CTUALS
ACTIVITY I. i Exr:E."JJ:T0RES
I ~X-t:'NDITUR-" I Rt:'Vt:'NU~S I NE, I PROVINCIAL I ~.JN,CIP~L I OTHeR 'EXPEN~T~RESI REVE~UES REv =XJ::S !
I t. r'~ ::.... ~~. t. EXPE~!DITURES I' GRANT ,~EVY ~ 'I
I ' ! : '\ I
,ta ff Salaries 39,880 - '39,880 19,940 119,940 - II 35,930 I - 34,0:'': , - I
'ehicles 3,400 - 3,400 1,700 1,700 - 3,070 - 2,451 I -
11 I i I I
I I I
I I I I
I i ! I
I, I I I
I I I I
I
,
I
I I
I I
I I II I
;
.
i
\ I I
i I
I
l
( )( I I )( . I I )[ I )[ I )
TOTAL 43,280 - 43,280 21,640 21,640 - 39,000 - 36,503 -
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conscrvation & Recreation Land ~lanagcment - Taxes and Insurance (C6) PAGE 45.
PURPOSE: To provicJe for costs associated with taxes on non-revenue producing arcas and liability insurance on Authority
lands and facilities under Conservation and Recreation Land Management Programs.
FINANCIAL CO~I~IENTS: It appears the spcnding for taxes in this category will be in line with the 1979 budget estimate of $60,000.
Therefore, to arrive at a budget for 1980, a 7.0 inflation factor has been added and 5% for addi tiona1 properties,
~o allowance has bee II made for market value assessment incrcases in 1980.
HJNDING: This is a sharcd program, 50\ of the funds bcing available from the Province of Ontario and the balance being
funded from the Gcneral Levy on all participating municipalities.
OBJECT[VE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Nages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
- - - - 10,500 67,500 - 78,000
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Conse rvat ion :; Rcc rea t ion L:md ~lanagelllent - Taxes :lIld Insurance' eel>) PAGE ~.
1980 BUDGET "\ SOURCES OF FINANCING ,( 1979 BUDGET ~7S ;..CTlI.....l.S
ACTIVITY EXPENDiTURES REVEr-:UES NET I PROVINCIAL T MUNiCIP~Ll OTH-R \! EXPENDITURES REV Ef\:UES EXPEN~~TU;;'ES fiEVE~~UES
EXPENDITURES GRANT LEVY , t:.
I I ~I !\ I I
Taxes, non-revenue 67,500 67,500 33,750 33,750 I - " 60,000 58,797
- I' - I -
Insurance 10,500 10,500 5,250 5,250 i\ 10,000 9,381 i I
-, - I' - -
I I
I I
I
i
I
I
I I
I
.
j I
I
;
.
,
I
I
I
i I
i t
I
.
I I
( TOTAL )( 78,000 I - I 78,000 )( 39,000 I 39,000 I - )( 70,000 I - )( 68,178 I - :
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Water & Re lated Land ~I:maj(ement - Watcrfront Proj(rams (Ji9) PAGE 47.
PURPOSE: To provide administrative, planning :md enginecring staff necessary for implementing the Waterfront Project.
--
FIJ:\DI:\C: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being
funded from the General Lcvy on all participating municipalities.
OBJECTIVE CL^SSIFIC^TIO~S ~1:1terial s
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expens~s Total
$ $ $ $ $ $ $ $
67,750 - - - 4,000 - - 71,750
PRELl MINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM I\atcr f, Rel:1tcd Land ~lanagement - I~;lterfront Programs (1~9) PAGE 4X,
SOURCES OF FINANCING 1979 BUDGET' ( 1973 ACTUALS ,
1980 BUDGET I
I ,
ACTIVITY NET PROVINCIAL MUN!C:P~L I
EXPENDiTURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVE:\UES I EXPS'lDITUR::S REVEi\:'J::S I
i
Staff Salaries 67,750 - 67,750 33,875 33,875 - 62,000 - 55,878 - I
Travel & Expenses 4,000 - 4,000 2,000 2,000 i - 4,000 - 3,011 - I
,
I I
I I
I I
I
I
I I
I
j
I
:
I I
I
I
I
I I
I t
I I
I
I
I j
I
I
( TOTAL )( 71,750 I - I 71,750 )( . 35,875 I 35,875 I - )( 66,000 I - )( 58.8R9 I - ~
PRELIMINARY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM Special Projects - Waterfront Plan PAGE 49.
PURPOSE: The purpose of the \~aterfront Plan is to create, on the Lake Ontario Shore I ine within the area of the Authon ty I S
jurisdiction, a handsome waterfront balanced in its land uses which will complement adjacent areas, taking cogni-
zance of existing residential development and making available, wherever possible. features which warrant public use.
1980 OBJECTIVES: _ the completion of the grading and installation of final armouring and arterial servicing as the first phase of
surface development at Humber Bay West, Phase II
_ the continuation of the landfill project at Bluffer's Phase II and installation of servicing to the boating
Federatloll site
_ the continuation of development at Humher Bay East in preparation for completion in 1981
_ the continuation or the environmental monitoring program
_ the continuation of acquisition of endangered homcs and construction of priority works relating to shoreline
management
_ the continuation of the regular acquisition program
_ thc completion of the approval process for Colonel Samuel Bois Smith Waterfront Area
_ the first phases of preparation of the implementation plan for Aquatic Park
- the continuation of the regular maintenance program
FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded
from the Waterfront Capital Levy on all participating municipalities. The Government of Canada has participated in
the construction of shore protection at the Small Craft Harbour at Bluffer's Park. It is anticipatcd that the Federal
Assistance will continue in 1980.
FINANCIAL CO~1I-IENTS: 1980 is the fourth year of the second five year project for Waterfront Development and the estimates are based on
anticipated cash flow from the Province of Ontario including $4~6,000 for the Supplementary Waterfront Project,
which would be matched by the Municipality of Metropolitan Toronto as benefiting.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Uti! i ties Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
80,000 - - 300,000 2,750,250 - - 3,130,250
PRELl MINARY
1980 CAPITAL BUDGET ESTIMATES
PROGRAM SpecIal Projects - ~aterfront Plan P:>.GE ,{)
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ( 1978 ACTlJALS 1
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNIC!PAL I OTHER I EXPENDITURES REVENUES I EXPENDITUfiES I REVEN:JES
EXPENDITURES GRANT LEVY
I I I
,
!lumber Bay West 950,250 - 950,250 475,125 475,125 - 160,000 - 39S,h32 -
t
lIumber Bay East 400,000 - 400,000 200,000 200,000 - 950,000 - 381,305 - I
I
l~estern Beaches - - - - - - 5,000 - 42,698 - I
^shbridge's Bay 40,000 40,000 20,000 20,000 I I 5,000 67,b83 I
- - - - I
i I
Bluffer's - I I; II 660,000 - 660,000 330,000 330,000 - ! 740,000 - 374,230 I - I
I
East Po int Park - - - - - - 20,000 - 46,255- -
Environmental Studies j
and ~lon i tor i ng 100,000 - 100,000 50,000 50,000 - 60,000 - 96,880 I -
, Sh~I'el ine ~1anagement 600,000 - 600,000 300,000 300,000 - 450,000 - 167,637 -
Staff Salaries 80,000 - 80,000 40,000 40,000 - 50,000 - 56,304 -
Land Acquisition 150,000 - 150,000 75,000 75,000 - 240,000 - 9,751,919 -
~bJlJling - - - - - - - - 539 I - J
Col. S. B. Smith 50,000 - 50,000 25,000 25,000 - 50,000 - 86,881 - I
Pett icoat Creek - - - - - - 20,000 - 16,030 -
I ~la intcnance 50,000 - 50,000 25,000 25,000 - 50,000 - - - I
Aquatic Park 50,000 - 50,000 25,000 25,000 - - - - -
3,130,250 1,565,125 1,565,125 2,800,000 11,486,993 I i
3,130,250 - - - - I
I
.
Adjustments to Levy to
match expenditures and
Provincial Grants
1977 (114,579)
1978 293,497
1979 6,490
( TOTAL )( I I )( 1:565,125 11,750,533 I )( t )( I ~
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM Historical Sites Development PAGE 51.
PURPOSE: To carry out restoration and development work at the Black Creek Pioneer Village in accordance with approved plans.
1980 OB.JECTIVES: To complete the restoration of the Richmond Hill Manse.
FUNDING: The Metropolitan Toronto and Region Conservation Foundation, Wintario and donations.
FI~A.";CIAL CmNE:-ITS: Work will proceed as funds become available.
OBJECTIVE CLASSIFICATIONS: Materials
Salaries Supplies & Real Services Financial
& Wages Utilities Equipment Property & Rents Taxes Expenses Total
$ $ $ $ $ $ $ $
10,000 6,000 - - 30,000 - - 46,000
PRELIMINARY
1980 CURRENT BUDGET ESTIMATES
PROGRAM lIistoric Sites Development PAGE --52.
1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ~1978 ACTUAL~
ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER ' EXPENDITURES REVE;\lUES EXPENDITURES REVENLJES
EXPENDITURES GRANT LEVY
Rob I in' s ~Ii 11 - - - - - - 1,000 - - -
Boardwalk -, - - - - - 1,000 - 2,453 -
Doctor's House - - - - - - - - 23,568 -
~1cllnonitc ~lccting /Iall - - - - - I - - - 8 I -
Taylor Cooperage - - - - - - 30,000 - 185 -
Sawyer's /louse - - - - - - 12,000 - - , -
I
Richmond /Iill ~1anse 46,000 - 46,000 - - 46,000 10,000 - 13,(>71 i - I
B.C.P.V. Visitors Centre - - - - - - - - 10,897 I -
I
J Collection - - - - - I - 6,000 - 775 I - i
I i
I
I
I
I
i
,
i
I
I
t
I
( TOTAL )( 46,000 I - I 46,000 )( - I - I 46,000 )( 60,000 I - )L!1,557 I - )
THE f1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
1981-1984 MULTI-YEAR FORECAST
OCTOBER 3, 1979
(/)
0
:I:
t1j
C
c::
t"
t1j tJ:I
:z I
o w
. IV
-..I
1981-1984 MULTI-YEAR FORECAST
I N D E X
PAGE(S) PAGE(S)
A & B Report Water & Related Land Management
1 Surranary
29 - 36 Interim Project
SUM!i':ARIES 37 & 38 Supplementary Project - Keating Channel
2 Expenditures Conservation & Recreation Land Management
Sources of Financing 39 & 40 Conservation Areas - Support
3 Revenues
4 Provincial Grants (Min. of Natural Resources) 41 & 42b Conservation Areas - Development
5 Provincial Grants (Min. of Culture & Recreation) 43 & 44 Conservation & Niagara Escarpment Land
6 Municipal Levies 45 & 46 Information & Interpretive Program
7 Foundation (includes Wintario) 47 & 48 Rent & Utilities
8 School Boards 49 & 50 Taxes and Insurance
9 Other
Waterfront
DETAILS
51 & 52 Waterfront - Support
Administration
Special Projects
10 & 11 Administration
53 & 54 Waterfront Plan
Operations & Maintenance
Historic Sites
12 & 13 General Operations
14 & 15 Conservation Area Operations 55 & 56 Historic Sites Development
16 & 17 Information & Education Operations
18 & 20 Black Creek Pioneer Village
Water & Related Land Management
21 & 22 Operations & Maintenance of W.C. Structures
23 & 24 Community Relations - Support
25 & 26 Community Relations - Development
27 & 28 Taxes and Insurance
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY A,
1981-1984 MULTI-YEAR FORECAST
~
INTRODUCTION
The Multi-Year Forecast for the four years 1981 to 1984 has been prepared at the request of the Province of Ontario.
The revised format shows the preliminary estimates for 1980.
The stated objectives of the Multi-Year Forecast are:-
(1) To encourage Authorities to plan their activities for the period and to establish priorities.
(2) To provide the Province with Authority plans for the period, expressed in dollars with identification of projects
having highest priority.
(3) To provide an equitable basis for the allocation of Provincial funds.
In corr.p1eting the Multi-Year Forecast, Authorities are requested to ensure that;-
(1) Provision has been made for all currently planned projects within the planning period.
(2) Cost estimates are realistic and projects are economically feasible.
(3) Priority and timing of projects is realistic considering the need for prior technical and funding approvals,
land acquisition, engineering etc...
(4) Funds for the Authority share of expenditures can be raised without undue difficulty.
AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES
The Metropolita~ Toronto and Region Conservation Authority has adopted a program designed to further the conservation,
restoration, development and management of the natural resources of the 1,339 square miles included in the Authority's
area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the
headwater areas of the Oak Ridges interlobate moraine, and the Niagara Escarpment as the major resources to which its
programs are applied.
B,
Established resource management programs include flood control and water conservation, erosion control, waterfront develop-
ment, and fish and wildlife management. In implementing these programs, 26,534 acres of land have been acquired and, in
addition to their being managed for the conservation functions they perform, they are made available to the community for
outdoor and conservation education, recreation and historic site purposes.
Within these comprehensive program guidelines, the Authority has, over the years, reflected the priorities and policies of
the partners, the participating municipalities and the Province of Ontario as expressed through the,respresentative Authority
members. Since 1957, 61% of the Authority's capital and development budget has been devoted to Water and Related Land
Managemen t . 25% has been devoted to Lake Ontario shoreline management, 12% to Conservation and Recreation Land Management
and 2% to Outdoor and Conservation Education.
The 1981-1984 Hu1ti-Year Forecast for administration, operations and maintenance, current and capital programs reflect the
emphasis on Flood Control and Hater Conservation, Waterfront Development and provide for the management of lands a:ld
facilities acquired and developed in connection with this program.
FOR}~T OF PRESENTATION
The 1981-1984 Hulti-Year Forecast has been prepared in accordance with the requirements of the Ministry of Natural Resources
"Policy, Procedures and Information Manual for Conservation Authorities" with respect to Administration, Water and Related
Land Management and Conservation and Recreation Land Management.
Anticipated cost levels for 1980 have been used throughout the Forecast. An inflation factor will be added by the Ministry
of Natural Resources in accordance with allowances approved by Management Board.
PROVINCIAL FUNDING
Administration 50%
Water and Related Land Management 55%
Conservation and Recreation Land Management 50%
Waterfront Project 50%
THE r1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -L-
MULTI-YEAR FORECAST 1981-1984
SUMMARY
1980
EXPENDITURES 1979 Budget Pre. Budget 1981 1982 1983 1984
Administration 1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 1,449,160
Operations & Maintenance 3,230,800 3,945,500 4,133,800 4,176,800 4,233,300 4,278,300
Water & Related Land Management 1,092,194 1,226,560 1,160,520 978,220 944,620 964,720
Interim Water Project 3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 ~,210,500
Supplementary Project - Keating Channel - 100,000 133-,000 200,000 200,000 433,000
Conservation & Recreation Land Management 514,800 464,210 512,310 562,310 543,510 530, 910~'
Waterfront - Support 66,000 71,750 71,750 71,750 71,750 71,750
Waterfront - Capital 2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000
Historic-Sites Development 60,000 46,000 750,000 - - -
12,709,757 14,176,230 15,239,290 15,703,740 16,242,840 16,538,340
SOURCES OF FINANCING
Revenues 2,412,200 3,072,770 3,273,335 3,284,835 3,323,835 3,351,835
Provincial Grant (Min. of Natural Resources) 4,606,195 5,029,643 5,273,171 5,909,906 6,212,526 6,359.431
Provincial Grant (Min. of Culture & Recreation) 90,000 97,000 102,000 102,000 102,000 102,000
Municipal Levy 5,077,368 5,530,817 5,630,784 6,286,999 6,534,479 6,655.074
Foundation (includes Wintario) 281,472 336,000 200,000 110,000 60,000 ' 60,000
School Boards 171,722 100,000 - - - -
Other 70,800 10,000 760,000 10,000 10,000 10,000
12,709,757 14,176,230 15,239,290 15,703,740 16,242,840 16,538,340
THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: --L-
MULTI-YEAR FORECAST 1981-1984
EXPENDITURES
1980
ADMINISTRAJ'ION 1979 Budget Pre. Budget 1981 1982 1983 1984
Administration 1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 1,449,160
OPERATIONS & ~\INTENANCE
General Operations 112,000 116,200 116,200 116,200 116,200 116,200
Conservation Ar~a Operations 1,370,800 1,696,000 1,704,400 1,707,400 1,723,900 1, 728,900
Community Relations & Education 859,000 1,100,400 1,219,400 1,259,400 1,299,400 1,339,400
Black Creek Pioneer Village 889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,300
3,230,800 3,945,500 4,133,800 4,176,800 4,233,300 4,278,300
WATER & RELATED LAND MANAGEMENT
Operations & Maintenance of W.C. Structures 184,000 209,940 205,000 208,000 209,000 213,000
Co~~unity Relations - Support 239,000 278,120 286,120 286,120 286,120 286,120
Community Relations - Development 471,194 459,000 376,000 176,000 126,000 126,000
Taxes & Insurance 198,000 279,500 293,400 308,100 323,500 339,600
1,092,194 1,226,560 1,160,520 978,220 944,620 964,720
INTERIM WATER PROJECT
Water Control Projects 92,500 117,350 117,350 132,500 132,500 132,500
Regulations 182,500 199,640 199,640 200,000 200,000 200,000
Conservation Services 208,000 258,950 270,000 280,000 290,000 300,000
All Benefiting 1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 3,753,000
Benefiting Municipalities 1,776,690 1,645,300 1,783,500 825,000 825,000 825,000
3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 5,210,500
Expenditures - PU8C 12
KEATING CHANNEL
KeJ.till<j ChLlnlwl - 100,000 133,000 200,000 200,000 433,000
CONSr.nVATTON " RECRET\'J'TON Ll\ND Ml\Nl\GEMENT
---- ---
Conservation Areas - Support 143,500 170,750 170,750 170,750 170,750 170,750
ConscrvJ.tion Arcas - Devclopment 126,500 126,500 154,000 200,000 200,000 200,000
C~~servation Areas - Development 66,000 23,000 40,000 40,000 17,000 -
CO:lscrvation &. Niagara Escarpment Land 48,800 - - _ _ _
Information &. Interpretive 21,000 22,680 22,680 22,680 22,680 22,680
Rent &. Utilities 39,000 43,280 43,280 43,280 43.280 43,280
Taxes &. Insurance 70,000 78,000 81,600 85,600 89,800 94,200
514,800 464,210 512,310 562,310 543,510 530,910
WATERFRONT
Waterfront - Support 66,000 71,750 71,750 71,750 71,750 71,750
Waterfront - Capital 2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000
HISTORIC SITES
Historic Sites Development 60,000 46,000 750,000 _ _ __ _
Total Current 6,763,794 7,753,690 8,580,540 7,850,740 7,864,840 7,927,340
Total Capital 5,945,963 6,422,550 6,658,750 7,853,000 8,378,000 8,611,000
12,709,757 14,176,230 15,239,290 ,15,703,740 16,242,840 16,538,340
THE fiETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ---3..-
MULTI-YEAR FORECAST 1981-1984
REVENUES
I 1980
ADmNISTRA:.rIO~ 1979 Budget Pre. Budget 1981 1982 1983 1984
Administration 70,000 70,000 70,000 70,000 70,000 70,000
OPERATIONS & ~~.INTEN^NCE
General Operations 16,500 16,500 16,500 16,500 16,500 16,500
Conservation Area Operations 710,000 982,335 985,300 985,300 997,300 997,300
Community Relations & Education 757,700 989,235 1,113,235 1,158,235 1,203,235 1,248,235
Black Creek Pioneer Village 750,000 888,900 949,800 949,800 949,800 949,800
2,234,200 2,876,970 3,064,835 3,109,835 3,166,835 3,211,835
HATER & RELATED LJ._l\m HANAGE~lENT
Operations & Maintenance of W.C. Structures - - - - - -
Community Relations - Support - - - - - -
Community Relations - Development - - - - - -
Taxes & Insurance - - - - - -
- - - - - -
INTERIM WATER PROJECT
Water Control Projects - - - - - -
Regulations - - - - - -
Conservation Services 15,000 62,500 65,000 65,000 70,000 70,000
All Benefj..ting - - - - - -
Benefiting Municipalities 27,000 40,300 33,500 - - -
42,000 102,800 98,500 65,000 70,000 70,000
Revc~ues - Pg. #2
KEi\TI~G CP_;N~~EL 'I ]
Keating Channel - - - - - -
CO:JSERVl\TION & RECREl\TION Ll\ND Hl\Nl\GE[>'lENT
Conservation Areas - Support - - - - - -
Conservation Areas - Development - - - - - -
Conservation Areas - Development 66,000 23,000 40,000 40,000 17,000 -
Conservation & Niagara Escarpment Land - - - - - -
Information & Interpretive - - - - - -
Rent & Utilities - - - - - -
Taxes & Insurance - - - - - -
I
66,000 23,000 40,000 40,000 17,000 -
WATERFRONT
Waterfront - Support - - - - - -
Waterfront - Capital - - - - - -
HISTORIC SITES
Historic Sites Development - - - - - -
-
Total Current 2,385,200 3,032,470 3,239,835 3,284,835 3,323,835 3,351,835
Total Capital 27,000 40,300 33,500 - - -
2,412,200 3,072,770 3,273,335 3,284,835 3,323,835 3,351,835
THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ~
MULTI-YEAR FORECAST 1981-1984
PROVINCIAL GRANTS - f1INISTRY OF NATURAL RESOURCES
1980
AD!1InSTR.lrrON 1979 Budget Pre. Budget 1981 1982 1983 1984
Auministration 638,500 714,580 689,580 689,580 689,580 689,580
OPERATIO~S & ~L\INTE~ANCE
General Operations - - - - - -
Conservation Area Operations - - - - - -
Co~unity Relations & Education - - - - - -
Black Creek Pioneer Village - - - - - -
- - - - - -
~,lATER & RELATED L&m MANAGEHENT
Operations & Maintenance of W.C. Structures 101,200 115,467 112,750 114,400 114,950 117,150
Co~~unity Relations - Support 131,Lf50 152,966 157,366 157,366 157,366 157,366
Co~unity Relations - Development 41,800 41,800 151,800 41,800 41,800 41,800
Taxes & Insurance 108,900 153,725 161,370 169,455 177,925 186,780
383,350 463,958 583,286 483,021 492,041 503,096
INTERIM HATER PROJECT
Water Control Projects 50,875 64,543 64,543 72,875 72,875 72,875
Regulations 100,375 109,802 109,802 110,000 110,000 110,000
Conservation Services 106,150 108,047 112,750 118,250 121,000 126,500
All Benefiting 736,600 809,358 840,405 1,775,400 2,064,150 2,064,150
Benefiting Municipalities 957,345 882,750 962,500 453,750 453,750 453,750
1,951,345 1,974,500 2,090,000 2,530,275 2,821,775 2,827,275
Provincial Grants - M.N,R. - Page #2
KEATI~'lG CHM1NEL
Keating Channel - 55,000 73,150 110,000 I 110,000 238,150
CO~SERVATIO~ & RECREATION LAND MANAGEMENT ! I
Conservation Areas - Support 71,750 85,375 85,375 85,375 85,375 85,375 I
Conservation Areas - Development 63,250 63,250 77,000 100,000 100,000 100.000
Conservation & Niagara Escarpment Land _ _ _ _ _ _
Information & Interpretive 10,500 11,340 11,340 11,340 11,340 11,340
Rent & Utilities 19,500 21,640 21,640 21,640 21,640 21,640
Taxes & Insurance 35,000 39,000 40,800 42,800 44,900 47,100
200,000 220,605 236,155 261,155 263,255 265.455
WATERFRONT
Waterfront - Support 33,000 35,875 35,875 35,875 35.875 35.8751
Waterfront - Capital 1,400,000 1,565,125 1,565,125 1,800,000 1,800.0001 1,800,000
HISTORIC SITES
Historic Sites Development _ _ _ _ _ __ _
Total Current 1,495,750 1,675,918 1,785,796 1,770,756 1,784,626 1,803,381
Total Capital 3,110,445 3,353,725 3,487,375 4,139,150 4,427,900 4,556,050
4,606,195 5,029,643 5,273,171 5,909,906 6,212,526 6,359,431
THE f1ETROPOLITAN TORONTO AND R: l.IOj~ COfJSERVATION AUTHORITY PAGE: ---5-
r-1ULTI-YEAR FJWt'.bT 1~Gl-1984
- - --
PROVINCIAL GRANTS - MINISTRY OF CULTURE & RECREATION
---
. ,_.
I I (JOO
AD:,:r:nSTRArrO:-l 1979 BudgL'!_ ,'n:. Budget :1.981 1982 1983 1984
Administration - , - - - - -
OPERl..TIO~S & HAI~TE~ANCE I
Genc~a1 Operations - - - - - - I
Conservation Area Operations - - - - - -
Coc~unity Relations & Education 18,000 25,000 30,000 30,000 30,000 30,000
Black Creek Pioneer Village 72,000 72 , 000 72 , 000 72 , 000 72 . 000 72 , 000
90,000 97,000 102,000 102,000 102,000 102,000
\.!ATEK f., RELATED L/\ND HANAGE:'![NT
Ope~ations & Maintenance of W.C. Structures - - - - - -
Corr~unity Relations - Support - - - - - -
Community Relations - Development - - - - - -
Taxes & Insurance - - - - - -
I INTERIM WATER PROJECT - : - - - - -
I
Water Control Projects - - - ' - - -
Regulations - - - - - -
Conservation Services - - - - - -
All Benefiting - - - - - -
Benefiting Municipalities - - - - - -
- I - - - - -
Provincial Grants - Min. of Culture & Rec. - Pg. it2
KEATING CHAN~EL
Keating Channel - - - - - -
CONSERVATION & RECREATION L~ND MANAGEMENT
Conservation Areas - Support - - - - - -
Conservation Areas - Development - - - - - -
Conservation & Niagara Escarpment Land - - - - - -
Information & Interpretive - - - - - -
Rent & Utilities - - - - - -
Taxes & Insurance - - - - - -
- - - - - -
WATERFRONT I
Waterfront - Support - - - - - -
Waterfront - Capital - - - - - -
HISTORIC SITES
HistorLc Sites Development - - - - - -- -
Total Current 90,000 97,000 102,000 102,000 102,000 102,000
-
Total Capital - - - - - -
90,000 97,000 102,000 102,000 102,000 102,000
THE rlETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -E..-
MULTI-YEAR FORECAST 1981-1984
MUNICIPAL LEVIES
1980
ADMINISTRA'i'ION 1979 Budget Pre. Budget 1981 1982 1983 1934
!~df.1inis trat ion 638,500 714,580 689,580 689,580 689,580 689,580
OPEPATIONS & M^I~TE~ANCE
General Operations 85,500 89,700 89,700 89,700 89,700 89,700
Conservation Area Operations 660,800 713,665 719,100 722,100 726,600 731,600
Community Relations & Education 73,300 79,165 66,165 61,165 56,165 51,165
Black Creek Pioneer Village 67,000 72 ,000 72 ,000 72 ,000 72,000 72 ,000
886,600 954,530 946,965 944,965 944,465 944,465
I,JATER & RELATED LAND MA~AGEME~T
Operations & Maintenance of W.C. Structures 82,800 94,473 92,250 93,600 94,050 95,850
Co~~unity Relations - Support 107,550 125,154 128,754 128,754 128,754 128,754
Community Relations - Development 34,200 34,200 34,200 34,200 34,200 34,200
Taxes & Insurance 89,100 125,775 132,030 138,645 145,575 152,820
313,650 379,602 387,234 395,199 402,579 411,624
E;TERIM 1.IATER PROJECT
Water Control Projects 41,625 52,807 52,807 59,625 59,625 59,625
Regulations 82,125 89,838 89,838 90,000 90,000 90,000
Conservation Services 86,850 88,403 92,250 96,750 99,000 103,500
All Benef~ting 602,673 662,202 687,605 1,452,600 1,688,850 1,688,850
Benefiting Municipalities 792,345 722,250 787,500 371,250 371,250 371,250
1,605,618 1,615,500 1,710,000 2,070,225 2,308,725 2,313,225
. _n. Levies - Page 112
I KEATING Cfu\NNEL I
I
Keating Channel - 45,000 59,850 90,000 90,000 19/f.850 I
I CONSERVATION & RECREATION LAND MANAGEMENT
I Conservation Areas - Support 71,750 85,375 85,375 85,375 85,375 85,375
Conservation Areas - Development 63,250 63,250 77 , 000 100,000 100,000 100,000
Conservation & Niagara Escarpment Land - - - - - - I
Infor~ation & Interpretive 10,500 11 , 340 11 , 340 11,340 11 , 340 11,340 I
Rent & Utilities 19,500 21,640 21,640 21,640 21,640 21,640
Taxes & Insurance 35,000 39,000 40,800 42,800 44,900 47,100
200,000 220,605 236,155 261,155 263,255 265,455
WATERFRONT
Waterfront - Support 33,000 35,875 35,875 35,875 35,875 35,875
Waterfront - Capital 1,400,000 1,565,125 1,565,125 1,800,000 1,800,000 1,800,000
HISTORIC SITES
Historic Sites Development - - - - - - -
-
Total Current - 2,268,850 2,502,292 2,492,909 2,573,149 2,584,379 2,600,124
Total Capital 2,808,518 3,028,525 3,137,875 3,713,850 3,950,100 4,054,950
5,077 ,368 5,530,817 5,630,784 6,286,999 6,534,479 6,655,074
THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -1......-
MULTI-YEAR FORECAST 1981-1984
FOUNDATION (INCLUDES WINTARIO)
1980
AmUNISTRA:.rION 1979 Budget ?re. Budget 1981 1982 1983 1984
Administration - - - - - I -
O?ERATIONS & HAINTENANCE
General Operations - - - - - -
Conservation Area Operations - - - - - -
Community Relations & Education 5,000 7,000 10,000 10,000 10,000 10,000
Black Creek Pioneer Village - - - - - -
5,000 7,000 10,000 10,000 10,000 10,000
t,.lATER & RELJ\TED LAND MANAGE1.IENT
Operations & Maintenance of W.C. Structures - - - - - -
Cor:~unity Relations - Support - - - - - -
Community Relations - Development 216,472 283,000 190,000 100,000 50,000 50,000
Taxes & Insurance - - - - - -
216,472 283,000 190,000 100,000 50,000 50,000
INTERIM WATER PROJECT
Water Control Projects - - - ' - - -
Regulations - - - - - -
Conservation Services - - - - - -
All Benefi t ing - - - - - -
Benefiting Municipalities - - - - - -
- - - - - -
Fou~dation-Wintario - Pg. #2
KEATING CI!A:mEL
Keating Channel - - - - - -
Cm:S::RVAT~O:i & RECREATION LAND K';'NAGEl-:ENT ,I
Co~servat~on Areas - Support - - - - - -
Conservation Areas - Development - - - - - - I
Conservation & Niagara Escarpment Land - - - - - -
I Infor~ation & Interpretive - - - - - -
Rcr.t & Utilities - - - - - -
Taxes & Insurance - - - - - -
- - - - - -
WATERFRONT
Waterfront - Support - - - - - -
Waterfront - Capital - - - - - -
HISTORIC SITES
Historic Sites Development 60,000 46,000 - - - __ -
Total Gurrent 281,472 336,000 200,000 110,000 60,000 60,000
Total Capital - - - - - -
281,472 336,000 200,000 110,000 60,000 60,000
THE rlETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: --1L
nUL TI - YEAR FORECAST 1981-1984
SCHOOL BOARDS
1980
ADHINISTRArION 1979 Budget Pre. Budget 1981 1982 1983 1984
Administration - - - - - -
O!'ERATIONS & HAI~TEl'lANCE
General Operations - - - - - -
Conservation Area Operations - - - - - -
Comnunity Relations & Education - - - - - -
Black Creek Pioneer Village - - - - - -
I W,TER & REU,TED LA:lD HANAGEMENT - - - - - -
Operations & !':aintenance of H.C. Structures - - - - - -
Co~~unity Relations - Support - - - - - -
Community Relations - Development 171,722 100,000 - - - -
Taxes & Insurance - - - - - -
171,722 100,000 - - - -
INTERIM HATER PROJECT
Water Control Projects - - - - - -
Regulations - - - - - -
Conservation Services - - - - - -
All Benefiting - - - - - -
Benefiting Munici~a1ities - - - - - -
- - - - - -
School Boards - Pg. /12
KEATU;C ClL\:mEL
Keating Ch<::.nnel - - - - - -
CmiSS?.VATION & RECREATION Lt"ND HANAGEMENT
Conservation Areas - Support - - - - - -
Conservation Areas - Development - - - - - -
Conservation & ~iagara Escarpment Land - - - - - - I
Information & Interpretive - - - - - - I
Rent & Utilities - - - - - -
Taxes & Insurance - - - - - -
- - - - - -
HATERFRONT
Waterfront - Support - - - - - -
Waterfront - Capital - - - - - -
HISTORIC SITES
Historic Sites Development - - - - - -
- -
Total Current 171,722 100,000 - - - -
Total Capital - - - - - -
171,722 100,000 - - - -
THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ---9.-
r'1ULTI -YEAR FORECAST 1981-1984
OTHER
-
1980
ADMmISTRA:rION 1979 Budget Pre. Budget 1981 19"&2 1983 1984
Administration - - - - - -
OPEP~TIO~S & ~~INTF.NANCE
General Operations 10,000 10,000 10,000 10,000 10,000 10,000
Conservation Area Operations - - - - - -
Community Relations & Education 5,000 - '- - - -
Black Creek Pione8r Village - - - - - -
15,000 10,000 10,000 10,000 10,000 10,000
HATER & .REL'\TED LAND !-'.ANAGEl'1ENT
Operations & Maintenance of W.C. Structures - - - - - -
Co~~unity Relations - Support - - - - - -
Community Relations - Development 7,000 - - - - -
Taxes & Insurance - - - - - -
7,000 - - - - -
INTERIl1 HATER PROJECT
Water Control Projects - - - - - -
Regulations - - - - - -
Conservation Services - - - - - -
All Benefiting - - - - - -
Benefiting Municipalities - - - - - -
- - - - - -
Oth;:!r - Pg. il2
KEA TING CH.....t,~:::L I
I
Keating Channel - - - - - -
CONSERVATION & RECREATION LAND ~~NAGEMENT
Conscrv3t:on Areas - Support - - - - - -
Co~servation Areas - Deve1opoent - - - - - -
Conservation & Niagara Escarpment Land 48,800 - - - - - I
Information & Interpretive - - - - - -
Rent & Utilities - - - - - -
Taxes & Insurance - - - - - -
48,800 - - - - - I
WATE~?RO;-JT I
Waterfront - Support - - -
- - -
Watecfront - Capital - - - - - -
HISTORIC SITES
Historic Sites Development - - 750,00C - - -
--
Total Current 70,800 10,000 760,00C 10,000 10,000 10,000
.
Total Capital - - - - - -
70,800 10,000 760,00C 10,000 10,000 10,000
1981-1984 MULTI-YEAR FORECAST PAGE: ~
PROGR~M: Administration
PURPOSE: To provide the administrative and financial services of the Authority.
Sa1a(ies of senior administrative staff and associated secretarial, administrators, the
Finance and Property & Administration Divisions are charged to this Program.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all participating municipalities.
f'iULTI-YEAR FORECAST 1981-1984
P!\O::;"-.-\2-:: AC::-.inistradon P.~.GE: ..J..L
I I I 1980 I I I ' :
I F I :i .;, ~ C ! :~ G 1979 Eud[',et Pre. J3udp..ct I 1901 1982 1923 I l' :-,.,
',.. _. , 1 3/-7 000 ! 1 '99 16~ " 1 4/9 l'O! 1 '49 l'O! 1 '/0 1'0 I 1 1 '. '
... ~.' .... _ . ~ ~ r.......... . ' I I . . l.. , I l . r,
,_..p,-,..~~~_~t;;~ .,.,........,........,...,...,',.... I ,II, i ,~ , U I ,! 0 I ,'+ ,.) I _,"'T~", 0 I ,..,.,).1.(;,. I
i ;{CVc:r:~2.> .,..,.,........,........................ 70,000 I 70,000 I 70,000 I 70,000 i 70,000; 7u,GOO i
I :-:2t i:::qencitur:es .......,...................... 1,277,000 1,429,160 I' 1,379.160 I 1,379,160 1,379,160: 1,:;:'9,ltJ)'
I ,
: !, I
II C:<:r.ts .......................................... 638,500 714.580 I 6d9,530 689,)80 I 63~.580 I 689,53" I
C:he:::: .',. - - I - - i - : - '
II Levy ..,..::::::::::::::::::::::::::::::::::::::: 638,500 I 71L!, 580 689,580 \ 689,530 I 689,530!. 639,580,
I , ,
I -~
1,277,000 1,429,160 1,379,160 1,379,160 1,379,160 I 1,379,160 J
I I I I I !
I 17 "IJ<'\'[) r""'''17'' I '
I ~."I.. .... ~,ul'..J I I
i S.,laries 560,150 621,610 621,610 621,610 I' 621,610 I 621,610 I
I Employee Benefits 4lfO, 500 460,500 460,500 460,500 460,500. 460,500 I
I Tt:ave:l Expenses 97,500 98,000 98,000 98,000 I 98,000 I 98,000 '
I Equipment: Purchase & Rental 36,000 36,400 36,400 36,400 I 36,400! 36,400 I
t~tcrinls & Supplies 81,500 89,600 89,600 89,600 . 89,600 89,600
I
Rent & Utility Services 77,250 82,650 82,650 82,650 82,650 82,650
General Expenses 54,100 60,400 60,400 60,400 60,400 60,400 l
Management Study - 50,000 - - - - I
1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 .1,449,160 i
I I
! I
1981-1984 MULTI-YEAR FORECAST PAGE: _JL.
PRGGRAf.1: Operations & Maintenance - Genera~ Operations
PURPOSS: To p~ovide administrative support services, for which a Provincial Grant is not available.
1981-1984 OBJECTIVES: - to fund the maintenance of revenue producing properties and other general maintenance
- to fund the public liability insurance on vehicles and equipment
- to fund renovations to th.:! Head Office Administration Building
- to fund ~he office cleaning. and maintenance
- to fund the Authority's share of vehicles and equipment
FUND ING : Program revenues, the General Levy on all participating municipalities and Authority funds.
MULTI-YEAR FORECAST 1981-1984
PROGP.A:-! : Operations & Maintenance - General Operations P':'.GE: JL..
1980 1
FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984
Expenc.itures .................................... 112,000 116,200 116,200 116,200 116,200 116,200 I
Revenues ........................................ 16,500 16,500 16,500 16,500 16,500 I 16,500 '
Net Expenditures .............................. 95,500 99,700 99,700 99,700 99,7001 99.700
Grants .......................................... - - - - - -
Ocher.......................................... . 10,000 10,000 10,000 10,000 10,000 10,000
Levy........................................... . 85,500 89,700 89,700 89,700 89,700 89,700
95,500 99,700 99,700 99,700 99,700 99,700
EXPENDITURES
Rental Property Haintenance - Revenue
Producing Properties & General Maintenance 32,500 27,500 27,500 27,500 27,500 27,500
Vehicle & Equipment Suspense 5,000 5,000 5,000 5,000 5,000 5.000
Insurance 12,000 12,850 12,850 12,850 12,850 12,850
Head Office Renovations 10,000 10,000 10,000 10,000 10,000 10,000
Flood Control Workshop 1,500 2,000 2,000 2,000 2,000 2,000
Office Cleaning 19,000 ~0,300 20,300 20,300 20.300 20,300
Office Maintenance 32,000 38,550 38,550 38,550 38,550 38,550
Bank Interest - Non-Capital Programs - - - - - -
. 112,000 116,200 116,200 116,200 116,200 116,200
1981-1984 MULTI-YEAR FORECAST PAGE: ~
PROGRAM: Operations and Maintenance - Conservation Area Operations
PURPOSE: The conservation and man~gement of the lands under the jurisdiction of the Authority and the
provision of outdoor recreation opportunities.
1981-1984 OBJECTIVES: The management and operation of 18,000 acres of Authority lands, including 13 conservation
areas, which will provide 1.5 million user days of recreation for each operating year.
To provide recreation programs which will provide additional recreational opportunities in
selected conservation areas.
To provide for increased maintenance required as a result of the continued development of
facilities in conservation areas.
FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial
Grant is available for this program.
Throughout the Forecast, increases in revenues and expenditures at Albion Hills, Bruce's Mill,
Cold Creek, Heart Lake and Petticoat Creek reflect increased recreation programs.
Expenditure and revenue increases at Claireville result from the expansion of the campground.
FINANCIAL COMP~NTS: An increased recreation program is reflected in expenditures and revenues. These programs are
self supporting with some net revenue resulting. There fore, any decrease in revenue would result
in a similar decrease in expenditures.
Because costs of labour and materials will continue to rise during the Forecast period, a general
fee increase will be required to retain the General Levy increases at an acceptable level. It is
anticipated that this will occur in 1983.
MULTI-YEAR FORECAST 1981-1984
PP.aG?,-~';: Operations & Mainten~nce - Conservation Area Operations PAG=:: --.J5.....
1980
FIN A N C I N G 1979 Budget Pre. Budget 1981 1932 1983 1934
Expendic:u:-es ......................:............. 1,370,800 1,696,000 1,704,400 1,707,400 1,723,900 1,728,900
Revenues ........................................ 710,000 982,335 985,300 985,300 997,300 997,300
I ~et Ex?endicures .............................. 660,800 713,665 719,100 722,100 726,600 731,600
I Grants .......................................... - - - - - I -
I 0-1-- ~r . - - - - 726 ~ 600 I -
E:::::::::::::::::::::::::::::::::::::::: : 660,800 713,665 719,100 722,100 731,600
660,800 713,665 719,100 722,100 726,600 731,600
EXPENDITURES
Albion Hills 233,000 275,850 276,000 276,000 278,000 280,000
Boyd 137,000 151,400 152,000 152,000 152,000 152,000
Bruce's Mill 161,000 224,600 225,000 225,000 226,000 226,000
Claremont 50,000 56,650 57,000 57,000 57,000 57,000
Clairevi11e 179,000 248,050 250,000 252,000 255,000 253,000
Cold Creek 92 , 000 130,950 131,000 132,000 135,000 135,000
Glen Haffy 84,500 96,850 97,000 97,000 97,000 97,000
Greenwood 103,000 115 ,900 116,000 116,000 116,000 116,000
Heart Lake 129,500 150,250 150,500 150,500 153,000 153,000
Humber Trails 9,000 10,200 10,200 10,200 10,200 10,200
Hi1ne 7,800 - - - - -
Pa1grave 9,000 14,150 14,200 14,200 14,200 14,200
Service Area 17,000 21,400 21,400 21,400 21,400 21,400
Hoodbridge . 8,000 9,100 9,100 9,100 9,100 9,100
Petticoat Creek 151,000 190,650 195,000 195,000 200,000 200,000
Visitors Servic~s - - - - - -
1,370,800 1,696,000 1',704,400 1,707,400. 1,723,900 1,728,900
1981-1984 MULTI-YEAR FORECAST PAGE: --1h.
PROGRAM: Operations and Maintenance - Information and Education Operations
PURPOSE: To provide an outdoor and conservation education program for school students and other cO:T'J:luni ty
grou?s at four existing conservation f~eld centres and a variety of outdoor and conservat~o~
education opportunities for the general public and school groups at the Kortright Centre for
Conservatipn and at the Black Creek Pioneer Village.
1981-1984 OBJECTIVES: - a continuation of the programs at the same level of service as in 1980 for existing facilities
- to provide for increasing public and group use of the Kortright Cer.tre for Conservation
- to provide an outdoor and conservation educat~on program and experience for the following
public ar.d groups by 1984: -
Black Creek Pioneer Village 64,000
Cold Creek Conservation Field Centre 10,000
Special Days, Field Trips, Watershed & Claireville Dam Tours etc... 36,000
Kortright Centre for Conservation 125,000
Residential Conservation Field Centres 30,000
FU:I!DI1\G: Program revenues and the General Levy on all participating municipalities. A surplus or defic~t on
the operations of the Boyd and Lake St. George Conservation Field Centres, will, by agreement, be
charged or credited to the participating Boards of Education. An agreement, similar to Boyd, will
be made w~th the participating and benefiting school boards for all future residential Conservation
Field Centres. A minimum grant of $30,000 from the Provincial Ministry of Culture & Recreation and
$10,000 from the Growth Endowment Fund is estimated for the operation of the Kortright Centre for
Conservation.
FINANCIAL CO~1ENTS: The estimates prov~de for revenues increasing in proportion to increasing expenditures. The cost
to the member municipalities is relatively constant for the period 1981-1984 and substantially less
than for 1980.
MULTI-YEAR FORECAST 1981-1984
PROGR.?2.!: . Operations & Maintenance - Information & Education Operatio~s P.:"GE: ~
1980
FIN A N C I N G 1979 Bud~ct Pre. Budget 1981 1932 1983 198~
i ;::x?Encitures .................................... 859,000 1,100,400 1,219.400 1,259,400 1',299,400 1,339,400 I
Revenues ........................................ 757,700 989,235 1,113,235 1,158,235 1.203,235 1,248,235 :
Net Expenditures .............................. 101,300 111,165 106,165 101,165 96,165 91,165
Grants ...............,.......................... 18,000 25,000 30,000 30,000 30.,000 30,000
Other ........................................... 10,000 7,000 10,000 10,000 10,000 I 10,000 i
Levy........................................... . 73,300 79,165 ~6,165 61,165 56,165 . 51,165 i
101,300 111,165 106,165 101,165 96,165 91,165
. I
EXPE~DITURES
Albion Hills Conservation Field Centre 147,500 158,000 158,000 158,000 158,000 158,000
Boyd Conservation Field Centre 167,000 180,000 180,000 180,000 180,000 180,000
Claremont Conservation Field Centre 151,500 158,000 158,000 158,000 158,000 158,000
Cold Creek Conservation Field Centre 36,500 37,000 37,000 37,000 37.000 37,000
Lake St. George Conservation Field Centre - I 68,500 180,000 160,000 160,000 '160,000 160,000
- II - 68,000 160,000 160,000 160,000 160,000
General Interpretive Program 10,500 11,000 18,000 18,000 18,000 18,000
B.C.P.V. Pioneer Life 37,500 38,550 38,550 38,550 38,550 38,550
B.C.P.V. Tours 73,000 77 ,150 77 , 150 77 ,150 77 ,150 77 ,150
Kortright 167,000 192,700 232,700 272,700 312,700 352,700
859,000 1,100,400 1,219,400 1,259,400 1,299,400 1,339,400
1981-1984 MULTI-YEAR FORECAST PAGE: -IL.
PROGPN1: Operations & Maintenance - Black Creek Pioneer Village
PURPOSE: To provide a living portrayal of a crossroads village in 1867 Ontario for 300,000 visi~ors
and students.
1981-1984 OBJECTIVES: - to continue the effective and efficient operation of the living heritage conservation
project
- to acco~modate the 300,000 visitors annu~11y and afford the opportunity to experic~c(
life in a typical central Ontario crossroads Village of 1867
- to adequa~e1y maintain the heritage structures, landscaping, animals and collections
- to staff the Dominion Carriage Works, the Taylor Cooperage, the Sawyer's House and the
Richmond Hill Manse
FUNDING: Hajor funding comes from gate receipts and sales outlets. It is anticipated that the Authority
will match erants from the ?linistry of Culture and Recreation with levy funds. Additional
funds are expected each year from the Foundation as the Black Creek Gro~vth Endowment Fund
continues to expand.
FINANCIAL COM}lE~TS: - the opening of the new buildings will involve six new staff at an average cost of $10,000
for wages and supplies; other areas of the operation expenditures will be generally
unaffected
- revenue from admission, growth endowment and sales outlets is expected to increase with
natural growth and the addition of the new buildings
MULTI-YEAR FORECAST 1981-1984
PROGRAN: Operations & Maintenance - Black Creek Pioneer Village PAG::: ~
1980 i
FIN A N C I N G 1979 Budf;et Pre. Budget 1981 1982 1'183 198.'. !
Expen-:i tures .................................... 889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,8001
Revenues ........................................ 750,000 888,900 949,800 949,800 949,800 949,8001
I
Net Ex?enditures .............................. 139,000 144,000 144,000 144,000 144,000 I 144,000
Grants .......................................... 72 ,000 72 ,000 72 , 000 72 ,000 72 ,000 72,000,
Octe::- ........................................... ,
- - - - - - I
Levy........................................... . 67,000 72,000 72 ,000 72,000 72 ,000 72 ,000 I
144,000 j
139,000 144,000 144,000 144,000 144,000 I
EXPENDITURES 1
I
Administration 178,000 188,000 188,000 188,000 188,000 I
188,000 I
Building Staff etc... 338,600 434,600 495,000 495,000 495,000 495,000
Food Facilities - 19,500 20,000 20,000 20,000 20,000 I
Gate House 16,500 18,300 18,300 18,300 18,300 18,300 I
Gift Shop 122,600 141,800 141,800 141,800 141,800 . 141 800
, I
Livestock 55,500 59,000 59,000 59,000 59,000 59,000
Mai~tenance - Buildings 64,000 35,500 35,500 . 35,500 35,500 35,500
Maintenance - Grounds 49,300 39,100 39,100 39,100 39,100 39,100
Promotion & Publications 13,000 17 ,300 17,300 17,300 17,300 17,300
Registrar 21,500 36,800 36,800 36,800 36,800 36,800
Revenue Activities 11,600 23,700 23,700 23,700 23,700 23,700\
Security 18,400 19,300 19,300 19,300 19,300 19,300 I
889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,800
MULTI-YEAR FORECAST 1981-1984
PROGRA."1: Operations & Maintenance - Black Creek Pioneer Village (Pg. 1}2) PAGE: -2l1...
1980
1979 Budget Pre. Budget 1981 1982 1983 1984
REVENUES
I
Admission Receipts 405,000 490,000 534,300 534,300 534,300 534,300
Endowment Interest 10,000 14,000 20,000 20,000 20,000 20,000
Food Services lfO , 000 45,000 45,000 45,000 45,000 45,000
Revenue Activities 18,000 28,500 28,500 28,500 28,500 28,500
Rentals & Miscellaneous 2,000 8,000 8,000 8,000 8,000 8,000
Sales Outlets 275,000 303,400 314,000 314,000 314,000 314,000
750,000 888,900 949,800 949,800 949,800 949,800
1981-1984 PiULTI-YEAR FORECAST PAGE: 2L-
PROG~AM: Water & Related Land Management - 9peration & ~1aintenance of Water Control Structures (W5)
PURPOSE: To maintain Flood Control works and structures as well as various erosion control works
carried out under the Downstream Erosion Control Program.
1981-1984 OBJECTIVES: - continuation of the regular maintenance program at an equivalent level
FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all participating municipalities.
MULTI-YEAR FORECAST 1981-1984
PROGRA.t: Water & Related Land Management - Operation & Maintenance of Water Control Structures (W5) PAGE: ~
1980 I
FIN A N C I N G 1979 Bud~et Pre, Budget 1981 1982 1933 198c. I
I
Expenditures .................................... 184,000 209,940 205,000 208,000 209,000 ' 213,000 ;
Revenues .......,................................ - - - - - I - I
:
Net E:qenditures .............................. 184,000 209,940 205,000 208,000 209,000 I 213,000
Grants .......................................... 101,200 115,467 112,750 114,400 114,950 117, 150 I
Other ........................................... - - - - - - I
Levy........................................... . 82,800 94,473 92 , 250 93,600 94,050 95,8501
184,000 209,940 205,000 208,000 209,000 I 213,000
EXPENDITURES I
Flood Warning System 18,000 24,000 24,000 25,000 26,000 27,000
C1airevil1e Dam 23,000 31,905 32,000 32,000 32,000 32,000
Milne Dam 4,000 5,000 5,000 5,000 5,000 5,000
G. Ross Lord Dam 23,000 24,730 25,000 25,000 25,000 25,000
Small Dams General 3,000 4,000 4,000 4,000 4,000 4,000
Flood Control Channels 75,000 65,305 70,000 70,000 70,000 70,000
Erosion Control 4,000 5,000 5,000 7,000 7,009 10,000
Major Maintenance 34,000 50,000 40,000 40,000 40,000 40,000
184,000 209,940 205,000 208,000 209,000 213,000
1981-1984 ~iULTI -YEAR FORECAST PAGE: ----2.L.
PROGRAM: Water & Related Land Management - Community Relations Program (Support) (\HO)
PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information,
community and staff relations and outdoor and conservation program.
1981-1984 OBJECTIVES: - to provide information, publications, tours and official openings of projects, photographic
coverage, movie prints of existing films and exhibits relating to water and lanrl management
aspects of the Authority program and to add clerical staff (9 months) to reserve space aL
the Kortright Centre for Conservation.
FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
MULTI-YEAR FORECAST 1981-1984
PROGRAH: . Water & Related Land Management - Community Relations (Support) (HIO) PAGE: ~
I 1980
FIN A N C I N G 1979 Budget, Pre, Eud~ct 19&1 1C"? 1933 1'384
>0_
Exp.::nditures ..................................... 239,000 278,120 286,120 2S6~1201 286,120 I 286,120
Rever:u~s ........................................ - - - - I -
~et: Expenditur.::s .............................. 239,000 278,120 286,120 286,120 286,120 286,120 I
I
Gra:1ts .......................................... 131,450 152,966 157,366 157,366 157,366 157,366;
Ot:~er ........................................... - - - - 128~ 7541 - I
Levy........................................... . 107,550 125,154 128,754 128,754 128,754
239,000 278,120 286,120 286,120 286,120 286,120 I
CONSeRVATION INFORl~TION
Staff Salaries 57,735 64,200 64,200 64,200 64,200 64,200
Staff Travel & Expenses 2,000 2,000 2,000 2,000 2,000 2,000
Publications & Printing 12,500 13,325 13,325 13,325 13,325 13,325 I
Tours & Special Days 4,015 3,200 3,200 '3,200 3,200 \ 3,200 I
Photographic Supplies 3,250 3,000 3,000 3,000 3,000 3,000
Motion Picture Program 4,000 3,000 3,000 3,000 3,000 3,000
Exhibits 1,000 20,000 20,000 20,000 20,000 20,000
Promotional Contingency 1,000 1,000 1,000 1,000 1,000 1,000
CONSERVATION EDUCATION
Staff Salaries . 53,500 58,770 66,770 66,770 66,770 66, 770
Staff Travel & Expenses 1,000 1,000 1,000 1,000 1,000 1,000
Education Supervisors 99,000 108,625 108,625 108,625 108,625 108,625
239,000 278,120 286,120 286,120 286,120 286,120
1981-1984 MULTI-YEAR FORECAST . PAGE: ~
PROGRAM: Water & Related Land Management - Community Relations Program (Development) (iVlO)
PURPOSE: To develop the facilities required to carry out the Policy of The Metropolitan Toronto and Region
Conservation Authority respecting the planning, development and management of Outdoor and Conservat~on
Education programs during the period 1981-1984.
1981-1984 OBJECTIVES: - the continuing development of trails, outdoor exhibits, indoor exhibits, the furnishings and
equipping of the Kortright Centre for Conservation building
- the planning and construction of residential facilities at Albion Hills and the Glassco Resldential
Cam?us as part of the continuing program of the Authority to provide outdoor and conserva~ion
education facilities in cooperation with the school boards of the region (not shown in multi-yeur
forecast)
FUNDING: - the construction of one replacement dormitory at Albion Hills ($200,000) is proposed to be funded
on a 55/45 basis from the Ministry of Natural Resources and The Metropolitan Toronto and Region
Conservation Foundation
- the Kortright Centre for Conservation area development would be funded on a 55/45 basis by the
Ministry of Natural Resouces and Municipal Levy
- the Kortright Centre for Conservation exhibits, furnishings and equipment would be funded by The
Metrcpolitan Toronto and Region Conse=vation Foundation
- the conservation field centres, Albion Hills and Glassco Park would be funded and scheduled on a
basis to be negotiated by the Authority and participating and benefiting school boards and is not
shown in the Forecast at this time
FINANCIAL COMMENTS: The financing of the further development of the outdoor and conservation education programs is based
on: -
- the Authority providing access to its lands at no charge to the region's school boards
- the participating and benefiting school boards providing the cost of development of the residential
Conservation Field Centres up to a matching amount
MULTI-YEAR FORECAST 1981-1984
PROGP,"'I...:'! : Hater & Related L.:md :!.:magement - Comluunity Relations (Development) (\-110) PAG=:: -.16,
1930 I I I ,
i
FIN A N C I N G 1979 Budget Pre. Budget 1981 1922 1033 1 r ~ , I
I _'";J~
Expenditures .................................... 471~1941 459,000 376,000 176,000 126:000 I 126,0001
Revenues ........................................ - - - - I
I
I 126,000 I
Net Expenditures .............................. L,. 71 , 194 459,000 376,000, 176,000 126,000 i
Grants .......................................... 41,800 41,800 151,800 41,800 41,8GO I Itl SOO I
, I
Ocher ........................................... 395,194 383,000 190,000 100,000 50,000 50, 000 I
Levy............,.............................. . 34,200 34,200 34,200 34,200 34,200 I' 34,200
I 471,194 459,000 376,000 176,000 126.0001 126,000!
I EXPENDITURES I I
I ,
I
I
IAlbion Hills Conservation Field Centre 7,000 - 200,000 - - -
I
Lake St. George - Stage II 171,722 100,000 - - - - I
Kortright I
a) Area Development 76,000 76,000 76,000 76,000 76,000 76,000
b) Exhibits, furnishings & equipment 216,472 283,000 100,000 100,000 50,000 50,000
471,194 459,000 376,000 176,000 126,000 126,000
I
1981-1984 MULTI-YEAR FORECAST PAG::: ~
PROGEAi'i: Water & Related Land Nanagerr.ent - Taxes and Insurance (W11)
PURPOSE: To provide for costs associated with taxes on non-revenue pro cueing areas ~nd liabili~y
insurance on Authority lands under {1acer and Relaced Ldnd ~anagemcn[ p~0g~ams.
FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all participating municipalities.
F INP.NCIAL COillIENTS: For the years 1981 through 1984, we have added a 5% increase for addiciona1 properti~s
only. No allowance has been made for inflation, or for any increase by virtue or ~ark~t
value assessment.
MULTI-YEAR FORECAST 1981-1984
P:Z-::'Ci{.'.:, : Water & Related Land Management - Taxes and Insurance (Wl1) PAGS: ~
1980 ~ l I I !
F I ~ A ~ C I ~ G 1979 Eud~et 19S1 1%2 1C,83 , E2i', i
1
Pre. Budp2t 293,4001 I
I I
279,500 I ,
E:':?<2nci tures .................................... 198,000 308~1001 323,500 i 339,6001
- J I
Revenues ........................................ - - i - I - I
I I
Net E:qcnditt;:-es .............................. 198,000 279,500 I 293,4001 308,100" 323,5001 339,600;
I
I I 177,9251 i
t Gr2nts ......................................................................... 108,900 153,725 161,370 169,Lf55 186.780!
Other ........................................... I
- - - - - -
Levy........................................... . 89,100 125,775 132,030 138,645 145,575 .152,8~~.
I 198,000 279,500 293,400, 308,100 323.500 j39,600!
I I
EXPENDITURES I
I I
Taxes, non-revenue 189,000 270,000 283,400 297,600 312,5001 328, leO i
Insurance 9,000 9,500 10,000 10,500 11,0001 1l,500J
198,000 279,500 293,400 308,100 323,5001 339,600
I
I
I
MULTI-YEAR FORECAST 1981-1984
PROGR.~'! : Water & Related Land Managemen~ - Interim Project Summary - Current and Capital P.:"GE: -29-L.
, 1979 Blld?;8t 1930 I I 198? ~:1 I I
F I ~ A N C I N G Pre. Budp,....t I 19~1. l ~?,.': I
3,692,800 I I
Exp,;;,nditures .................................... 3,598,963 3,898,500 4,665,5001 5,200,500j 5,210,5001
Revenues ........................................ 42,000 102,800 I 98,500 65,0001 70,000 70.000:
I I 5,1/.O,500!
~e~ Expenditures .............................. 3,556,963 3,590,000 3,800,000 4,600,500, 5,130,500 !
I I I !
Grants .......,.................................. 1,951,34) 1,974,500 2,090,000 2,530,275 :-c ,82,1,77 5 2,327,'27Sl
Ocher ..................................................................................... - - - - - - i
I
Levy.....,..................................... . 1,605,618 1,615,500 1,710,000 2,070,225 2,308,725 2,313,2251
3,556,963 3,590,000 3,800,000 4,600,500 5,130,500 5,140,500 i
:
EXPENDITURES j
W.C. Projects 92 , 500 117,350 117 , 350 132,500 132,500 ? I
13~,5001
Regulations 182,500 199,640 199,640 200,000 200,000 200,000 I
Conservation Services 208,000 258,950 270,000 280,000 290,000 300,000
All Benefiting , 1,339,273 1,471,560 1,528,010 3,228,000 3,753,0001 3,753,000
Benefiting Municipalities 1,776,690 1,645,300 1,783,500 825,000 . 825,000 825,000
3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 5,210,500
I
- -
1981-1984 MULTI-YEAR FORECAST PAGE: ---3D.......
PROGRu.i'l: Water & Related Land Management - Interim Project Current (~n) (~!3) (1.-17) (\013)
PURPOSE: To provid~ the funding required for carrying out the objectives of the Interim Water and
Related Land ~lanagement Project under current budget category and which apply to all
municipalities benefiting as well as single benefiting mu~icipalities.
1981-1984 OBJECTIVES: _ to continue the program of the installation of a radio system in co-operation witr. the
Ministry of Natural Resources for transmitting flood control and flood warni~g in~ormatio~
_ to continue to update and improve the flood warning systeo
_ the administration and enforcement of water managenent regu1atio~s, and sub-division reviews,
including salaries of enforcement officers and sub-division review staff, travel, legal and
technical support costs
_ to carry out resource management practices on Authority lands and to provide Conservation
Assistance Programs for private landowners
FUNDING: This is a share~ program, 55% of the funds being available from the Province of Ontario, and
the balance being funded from the General Levy on all participating municipalities,
MULTI-YEAR FORECAST 1981-1984
P~OG~~'!: Water & Related Land f~nagement - Interim Project Current - Water Control Projects (W2) 'D.\.....~ . 3h
. ..v_.
11979 Budl?8t 1980 I I ! I
FIN A ~ C I N G 1981 19S:,J } 9~~3 . " ---J
Pre. Bud9:ec I - .. .)-
E:.:pcr~ci::~rf:s ...................................................................... 92,500 117,350 I 117.350 I 132~5001 132~5001 13::: . 50C i
Revenues ........................................ - - I - i - i
!
117.3501 I
Net Expe:1citures .............................. 9L,500 117,350 132,500 132,500 132,500 I
G:::::.r:ts ..,....................................... 50,875 64,543 64,5431 72,875 72.,875 7"1 Q.......... I
. .. ." I)
I
I 0;: he:: ,........,..,.............................. 59 ~ 6251 I
- - - - -
LE:VY ............,............................... 41,625 52,807 52,807 59,625 59,625
92,500 117,350 117,350 132,500 132,500 132,500
EXPEiWITURES \ I
I
Staff Salaries 65,800 91,350 91,350 106,500 106.500 106,500 I
Staff Travel 3,700 3,000 3,000 3,000 3.000 3,000
Flood Warning System - Radio 15,000 3,000 3,000 3,000 3,000 3,000
- Telemarks 8,000 20,000 20,000 20,000 20,000 2C.GO~
92,500 117,350 117,350 132,500 1'32,500 . 132.500 I
I
.
I
,
I
i
MULTI-YEAR FORECAST 1981-1984
PROGRAH: Water & Related Land ~lanagement - Interim Project Current - Water Management Regulations (W7) 'P'G- ~
....-.. ~:
I 1980 I I I
FIN A N C I N G 1979 Budget Pre. Bu~l'-;ct 19::-;:' , 1982 1953 I
I i" ~.'.. !
I ": no ~ 000 I I
Expendi tures .................................... 182,500 199,640 199,640 200,000 I 20a,OOO:
Reven~es ........................................ - - - - I - i
!
Net Expenditures .............................. 182,500 199,640 199,6l~O 200,000 I 20.J,OOO! 2C:0 ,JGC ;
I I ;
I .
, I
I G::ants .......................................... 100,375 109 ~ 802 I 109,802 ' 110, GOO 110~OOO i 110,000
I
Ocher ........................................... - - - 90 ~ 000 I
Levy........................................... . 82,125 89,838 I 89,838 90,000 90 ,000 I'
182,500 199,640 I 199,640 200,000 200.000 ! 200,000 I
I
I .
E:\PENDLTURES I i
I
I
Staff Salaries 104,800 118,650 118.650 118,650 118,650 I 118,650 !
Staff Travel and Expenses l.,OOO 4,000 4,000 4,000 4,000 I 4,000 I
Enforc~rncnt Offic~rs Salaries 48,900 54,290 54,290 54,290 54,290 j 54,290 !
Enforceffient Officers Vehicles 11,500 12,000 12,000 12,000 12 ,000 12,000 I
Legal Fees 8,300 5,700 5,700 6,060 6,060 6,060 I
I Technical Plans and Maps 5,000 5,000 5,000 5,000 5,000 5,000
I
182,500 199,640 199,6l.0 200,000 200,000 200,000 j
I
I
I
1
I
MULTI-YEAR FORECAST 1981-1984
PROGRA}! : Wacer & Rciaccd L~nd Manage~ent - Interim P=ojcct C~rrent - Cons. Scrv1c~s & Rive=bank Ero5io~ (W3 WS)PAGE: ~
1980 I
F r ~ A ~ C I N G 1979 Budget Pre. Bud~et 1981 1932 ,
1983 19~~ ,
I
Expenditures .... ........... ........................ ...... ...................... 208,000 258,950 270,000 280,000 290,00;) 3GO'O~
Revenues .. .... .............. ...................................... .... .................. 15,000 62,500 65,000 65;000 -:'0,000 70,000
Net Expendicu=es ................................... ........................ 193,000 196,450 205,OGO 215,000 220,000 230 aGDI
I' i
Grancs ............. .. .. .. . . ....................... ........ .... ..... ........... 106,15.0 108,047 112,750 118,250 121,000 126,500 !
Donacions .......... .. ... . ... ............ .......... ..... ................ ......
Lcvy ................ ............ ........ ......... ... .................. ........... 86,850 88,403 92,250 96,750 95,000 103,500
193,000 196,450 205,000 215,000 220,000 230,000
EXPENDITURES
Staff Salaries 31,400 34,850 37,000 40,000 42,000 44,000
Staff Travel 2,000 2,600 3,000 3,000 4,000 4,000
Plant Propagation 5,000 40,000 41,000 43,000 45,000 47,000
Forestry Development 22,000 8,000 - - -
Private Lands - Forestry 33,000 43,500 44,000 46,000 46,000 48,000
- Stream Improvement 28,000 27,000 35,000 40,000 40,000 40,000
- Land Use Planning 13,600 5,000 10,000 12,000 13,000 15,000
Authority Lands - Forestry 65,000 66,00.0 70,000 72,000 72,000 - 74,000
- Stream Improvement 20,000 10,000 10,000 10,000 12,000 12,000
- Land Management 10,000 8,000 12,000 14,000 16,000 16,000
208,000 258,950 270,000 280,000 290,000 300,000
I
-- -
1981-1984 MULTI-YEAR FORECAST PAGE: ~
PROGRAr1: Wate~ & Related Land Management - Interim Project Capital
PURPOSE: To provide the funding required ror carrying out the objectives of ~h~ Interim Water and
Related Land Management Project under capital budget category and which apply to all munici-
palities benefiting as well as sinBIe benefiting municipalities.
1981-1984 OBJECTIVES: - to continue Hyoro1ogic and Environmental Studies
_ to carry Ollt: pr(!limimlry ~..nd final ~l:,.ince,:in~~ .-,i p;-ojcccs prop.:HlIi:d ur.der lkW flood cc.':n:rol
plan co~mencing 1982
_ to carry out land acquisit~on component of the Flood Control Plan
, _ to carry out erosion control and flood control structures in accordance with the proposals
and the revised Flood Control Plan
_ continuation of the downstream erosion control in the regions of Metropolitan Toronto, Peel,
York and Durham
_ the completion of the Stouffville Channel on the Duffin Creek and the completion of works
on che Wilket Creek and channel maintenance on Centreville Creek at Caledon East
_ construction of Flood Control Channel en the East number - Oak Ridges, Tow~ of Richmond Hill
_ acquisition of specific hazard ,lands etc. deemed to be benefiting to a particular municipal-
ity
FUNDING: This is a shared program, 55% or the funds being available from the Province of Ontario and the
balance being funded from the Capital Levy on all participating municipalities.
-
<,
~.)
MULTI-YEAR FORECAST 1981-1984
PROC?-,:..l.! : Wate~ & RG1ated Lar.d ttanagc~ent - I~cerirn Project C~pita1 - A~l Ben~fi~ing p'r.r. -.2~
- .-"v_ .
1980 I I i I
F I ~ A ~ C I N G 1979 Bud~et ,Pre. Budget 19S1 I 198~ 1 ~'S3 :.02~ !
: I I
E:--:.pe:lci;:ures ........................................................................ 1,339,273 1,471,560 I l,52S,OlClI 3,228,000 3 , 753 ,000 i 3,753,OCO!
I
I RevenL:es ..........................,.............. - - - ! - I - I - !
I i
~e:: EX"Jenditu~es .............................. 1,339,273 1,471,560 i 1,528,010 I 3,228,000 3,753,000 I 3,753,000!
I . I I
I I :
I G~ants .................................:........ 736,600 809,358 840,405 1,775, L,OO 2 ,06~ ,ISO i 2,064,150 I
OL:~er ........................................... - - , - - - I - ,
I I
Levy........................................... . 602,673 662,202 687,605 1.452,60C 1,688,850 ! 1,638,350 i
I 3,753,000 I
1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 i
EXPENDITURES I I
P1a<1 Review 397.000 236.000 I - - - - I
Environracnta1 Honitoring 100,000 172,000 - - - - I
Flood Plain Acquisition 682,273 848,560 1,098,010 1,500,000 1,500,000 1,500,000 i
I
Headwaters Acquisition 160,000 200,000 200,000 200,000 200,000 200,000
Mappin~ - 10,000 - - - -
Public Relations - 5,000 5,000 5.000 5,000 5,000
Studies, Environ~cnta1 Assessment & Mapping - - 225,000 225,000 250,000 250,000
Erosion, Flood Control Structures (General) - - - ,1,000,000 1,500,000 1,500,000
Sediment Control & Prevention - - - 298,000 298,000 298,000
1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 3,753,000
f1UL TI -YEAR FO[{ECAST 1981-1984
?RCG?__~'~; Water & Re1ate~ Land Macagement - Interim Project Capital - Benefitin~ !~nicip31ities ?_':"'CE: -2h
1900 -I I ,
I
F I X A N C I N G 1979 Budget Pre. Eudf~et 1981 1982 1903 I L 9~!; ,
,
1,783,500 I 825,000 I I ~
,- " 1,776,690 1,645,300 825,000 ! 825,000 i
:.:{rJE::1C~tJr2S .... a . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I
I I
Rc.....e:1ues ........................................ 27,000 ! 40,300 33,500 ! - 1 - -
I I R?C. 000 i
Net Ex?ecditur-es ,............................. 1,749,690 1,605,000 1,750,000 8')~ ono I 825,000 I
-), .J 1 L --', I
, I
,
G::-an::-s .....,.,.................................. 957,345 882,750 962,500 453,750 453.750 ; 45::,;50 .
0[; he r- ............................................ : I
- - - - - j - I
Levy........................................... . 792,345 722,250 I 787,500 371,250 "71 r~ I 371 ') <'0 i
J ,)U I . ......, LJ ,
1,750,000 I 825,000 i i 825,000 I
1,749,690 1,605,000 825,000 i
.' . I I
., . .1
EXPENDITURES !
Erosion Control
500,000 I
Mecro 825,000 825,000 875,000 500,000 500,000
Peel 101,000 105,500 105,500 70,000 70,000 70,000
York 75,500 83,300 26,500 35,000 I 35,000 35,000 I
Durham 25,500 26,500 26,500 20,000 20,000 ~O,OOO I
Highland Creek (11) 240,000 - - - - - I
Stouffville (Y) 395,000 305.., QOO - - - - I
Wi1ket Creek (M) 10,000 250,000 - - - - I
Oak Ridges (Y) 5,000 50..000 500,000 - - -
Flood Control Channels - - 250,000 - - - I
WC-58 - Don River 99,690 - - - - -
Hethane Gas Study - - - - - -
Acquisition of Benefiting Municipality Lands - - - 200,000 200,000 200,000
1,776,690 1,645,300 1,783,500 825,000 825,000 825,000
1981-1984 MULTI-YEAR FORECAST PAGE: . ~
PROGRAr'i: Water & Related Land Management - Supp1cffientary Projccc - Keating Ch~nne1
PUlli'OSE: To provide fu~ding for the protcction of th~ lower Den River Area from flooding.
1981-198~ OBJECTIVES: To provide funding for the dr~dging of the Keating Channel on an ongoing basis.
FU:iDING: This is a sh&red Progrmn, 55% of ~he funds being av~il~blc from the Province or Ontario
and the balance being funded from the Hunicipality of Hetropo1itan Toronto, it being
the designated Benefiting Municipality.
MULTI-YEAR FORECAST 1981-1984
PRCG:::..AH ~ Water & Related Land Management - Supplereentary Project - Keating Channel P.:..G::: : 33.
I I 1930 I .
.
FIN A N C I ~ G 1979 Bud~et Pre, nueget 1981 1982 1<)83 10S~ ,
:,:,,:pG::-.ditu:-es ....................................... I I 133.000 200,000 200,000 I [,33.000 I
- 100,000 I
Rev(:!1ues ......................................... I I
- - I - ! - - I - I
I i 100,000 -, 133.0001 I I
l\et: ;::":?c~citures ................................ - 2GO,OOJ I 200, JCO ; 4'" 3 C,]Cl I
I [ .J , \. I
I ~'3 l' 0 I
Gr~nts .......................................... - 55,000 73,150 no,ooo I llq,OOO I
Oche:- ..,........................................ - - - - - I ~J ~ ) I
Levy............................................ . - 45,000 59,850 90,000 90,000 1- 194.8:'0 i
100,000 133.000 200,000 I 200,000 I ' I
- 433.0uO I
I I ! I I !
J::xPI::;m i'~'uRES !
Kcatin~ Chaancl DrcJ~ing I I
- 100,000 133,000 200,000 200,000 433,000 I
I
.
I
I
I
I
I I
I
I
I
I
1981-1984 MULTI-YEAR FORECAST PAGE: ~L
PROGMr'l: Conservation & Recrcation Land Management - Conservation Arcas (Support) (Cl)
PURPOSE: To administer and develop Authority owned conservation lands in keeping with the Interim
Conserva~ion and Recreation Land Management Plan (1979) .
To provide a comprehe~sive program of management and prov1s10n of outdoor recreation opportunities
through facility improvements and master planning of conservation areas.
1981-1984 OBJECTIVES: To finalize the Conservation and ,Recreation Land Management component of the Watershed Plan.
To develop and schedule the Master Plans of Conservation Areas.
To administer existing programs and activities.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL CO~~ENTS: These estimates reflect the requirement for additional clerical staff and an increase on fish
and wildlife habitat improvements.
MULTI-YEAR FORECAST 1981-1984
'P~CG~;l.! : Conservation & Recreation Land Management - Conservation Areas (Support) (C1) PAGE: 40.
1980 l
FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 ' (l ~ ,', I
.L~U"'" .
I -,
='::~?2:ldi::~res ~...................................................................... 143,500 170,750 170,750 170,750 170,750 I 170,750 !
Revenues ......,................................. - - - - - I - I
:-;et Expenditures .............................. 143,500 170,750 170,750 170,750 170,750 170,750 i
!
Gr a r. t s ... '. _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71,750 85,375 85,375 85,375 85,375 85,375 i
I I
'Other .,....... _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - I - I
I
Levy........................................... . 71,750 85,375 85,375 85,375 85,375 85,375
143,500 170,750 170,750 170,750 170,750 170,750
EXPENDITURES I
Staff Salaries
127,260 150,000 150,000 150,000 150,000 150,000 I
Staff Travel & Expenses 3,240 3,600 3,600 3,600 3,600 3,600
Vehicles 6,500 7,150 7,150 7,150 7,150 7,150 I
Pond Service 6,500 - - - - - I
Fish & Wildlife Habitat - 10,000 10,000 10,000 10,000 10,000
143,500 170,750 170,7~0 170,750 170,750 170,750
1981-1984 MULTI-YEAR FORECAST PAGE: ~
PROGRAM: Conservation and Recreation Land Management - Conservation Areas (Development) (Cl)
PURPOSE: To develop facilities on Authority owned conservation lands in accordance with the Recreation
component of the Conservation and Recreation Land Managem~nt Plan. This plan reco.nrnends a
comprehensive program of conservation and the provision of outdoor recreation opportunities.
1981-1984 OBJECTIVES: To develop the Claireville Beach area including a refreshment/change room facility and ground
developments.
To develop an additional picnic area to accomodate approximately 1000 additional visitors and
required road adjustments at Claireville Area.
To complete the Indian Line Campground extension including a washroom/shower building and
landscaping of sites.
To provide funds for small development items and the initiation of the expansion of the Boyd
Area, and facility developments in Albion Hills, Cold Creek and Heart Lake Areas.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL COMMENTS: Provincial and municipal funding limitations on this program have necessitated the concentration
of development.
--
MULTI-YEAR FORECAST 1981-1984
PROGRAl-l: Conservation & Recreation Land Management - Conservation Areas (Development) (C1) PAGE: 112....-
1980
FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984
Expendi tures .................................... 126,500 126,500 154,000 200,000 200,000 200,000
Revenues .......................... '. . . . . . . . . . . . . . - - - - - -
::ct Expenditures .............................. 126,500 126,500 154,000 200,000 200,000 200.000 I
Grants .......................................... 63,250 63,250 77 ,000 100,000 100,000 100,000 I
Other ...................."....................... - - - - - -
Levy........................................... . 63,250 63,250 77 ,000 100,000 100,000 100,000 I
126,500 126,500 154,000 200,000 200,000 200,000
EXPENDITURES I
Albion Hills 40,400 - - - - 40,000 I
Black Creek 1,000 1,500 - - -
Boyd - - - - - 96,000
Bruce's Hill 8,600 25,000 - - - -
C1airevil1c 3,300 79,000 130,000 185,000 185,000 -
Claremont - - - - - -
Cold Creek 38,000 4,000 - - - 10,000
Glen Haffy 8,500 9,000 9,000 9,000 9,000 9,000
Greenwood 3,200 - - - - -
Heart Lake 5,500 " - 10,000 - - 40,000
Oak Ridges - - - - - -
Petticoat Creek 8,000 - - - - -
Glen Major - - - - - -
Lake St. George - - - - - -
Studies etc... 10,000 5,000 - - - -
General Deve1opm~nt - 3,000 5,000 6,000 6,000 5: 000 \
Milne - - - - -
126,500 J.26,500 154,000 200,000 200,000 200,000
1981-1984 MULTI-YEAR FORECAST PAGE: 42A
...............
PROGR4M: Conservation & Recreation Land Management - Conservation Areas (Development) (Cl)
PURPOSE: To complete the rehabilitation of the South Thackeray Landfill Site.
1981-1984 OBJECTIVES: _ to install various plant materials consisting of reforestation stock, deciduous trees and
woody plant materials from the Authority nursery
_ to complete rehabilitation of the Thackeray Landfill Site for minor recreation and wildlife
habitat ,
FUNDING: The Corporation of the Municipality of Metropolitan Toronto will be providing total funds nece-
ssary for this project.
FINANCIAL COMMENTS: There will be no effect on the Municipal Levy or Provincial funding for this program.
MULTI-YEAR FORECAST 1981-1984
PROGRA~.l : Conservation & Recreation Land Management - Conservation Areas ( Deve lopmen t) (Cl) PAC:::: 42B
-
1980 I
FIN A ~ C I N G 1979 Budget Pre. Budget 1931 1982 1983 1984
=:xpc.ndi cures .... .................... .................... ............................ 66,000 I 23,000 40,000 40,000 17,000 - !
!(.:;ve:1ues ........................................ 66,000 23,000 40,000 40,000 17,000 - I
Net Expenditures ...... ...................................................... - - - - - - i
Grants .................... .................................................... ............ - - - - - I - I
Other ..,........................................ - - 1
- - - - I
Levy........................................... . - - - - - -
- - - - - - \
I
EXPENDITURES I
Thackeray Landfill Site - Revegetation 40,000 17,000
18,000 20,000 40,000 -
Strategic Planning for Ontario Fisheries 48,000 3,000 - - - -
66,000 23,000 40,000 40,000 17,000 -
I
1981-1984 MULTI-YEAR FORECAST PAGE: JlL
PROGRAr1: Conservation & Recreation Land 11anagement - Conservation & Niagara Escarpment Land (C2)
PURPOSE: To acquire Conservation Area and Niagara Escarpment lands as set out in the Authority's plan
for ancillary conservation measures and Niagara Escarpment land acquisition, The purpose of
such acquisitions is to bring into public ownership environmentally important lands such as
source areas, headwater zone river valleys and Oak Ridges inter10bate moraine lands.
FUNDING: This is a shared program, a 50% grant on Niagara Escarpment Land and Conservation lands is
available from the Province of Ontario, the balance being funded from the General Levy on
all participating municipalities or funds which may be made available through The Metropolitan
Toronto and Region Conservation Foundation or through funds raised through Authority revenues.
MULTI-YEAR FORECAST 1931-1984
PROGRAH: Conservation & Recreation Land Management - Conservation & Niagara Escarpment Land (C2) PAGE: ~
1980 I 1
F I ~ A N C I N G 1979 B'..ldget Pre. Budget 1981 1982 1983 1 CQ,
..l.. .-........-
I - c' 48,800 !
I ::':-:pE::1 ~tures ...,................................ - - - - -
i
Revenues ..,..................................... - - - - - - ,
N2t Ex?enditures 48.800 - - - - ~
..... ....... ....... ............ .....
Gro.nts .............................................................. .. - - - - -
Other ........................................... 48.800 - - - - -
Levy........................................... . - - - - - -
48,800 - - - - -
I
EXPENDITURES
Niagara Escarpment Land - - - - - -
Conservation Area Land 48,800 - - - - -
48,800 - - - - - I
1981-1984 MULTI-YEAR FORECAST PAGE: ~
P'ROGRAM: Conservation & Recreation Land Management - Cons. Area Information & Interpretive Program {C3)
PURPOSE: To provide information and special programs related to recreation and land management in
the Authority's conservation areas.
1981-1984 OBJECTIVES: To continue the program as in 1980.
FUNDING: This is a shared program, 50~ of the funds being available from the Province of Ontario and the
balance being funded from the General Levy on all participating municipalities.
FINANCIAL CO~L~ENTS: Limited funding from the Province of Ontario and member municipalities requires some .programs
to be funded from operations and maintenance.
MULTI-YEAR FORECAST 1981-1984
PROGRAH: Conservation & Recreation Land Management - Cons. Area Information & Interpr~tive Program (C3) PAGS: ~
1980 i
FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 198L,. I
E:-:pendit'clres .................................... 21,000 22,680 22,680 22,680 22,680 22,680 I
Revenues ..,..................................... - - - - - -
1\ec Ex?enditures ,............................. 21,000 22,680 22,680 I 22,680 22,680 ! 22,680
I
I
Gr-2.nts .......................................... 10,500 11,340 11 , 340 11 ,340 11,340 11,340 I
Ocher ........................................... - - - - - - I
I L12vy .......,.................................... 10,500 11 , 340 11,340 11 , 340 11 , 340 11,340 !
I ' 21 ,000 22,680 22,680 22,680 22 ,680 22,680
EXPENDITURES
Staff Salaries 11,100 12,320 12,320 12,320 12,320 12,320
Publications & Printing 3,000 4,500 4,500 4,500 4,500 4,500
Tours & Special Days 2,000 2,300 2,300 2,300 2,300 2,300
Photographic Supplies 2,900 2,560 2,560 2,560 2,560 2,560
Motion Picture P~ogram 2,000 1,000 1,000 1,000 1,000 1,000
21,000 22,680 22,680 22,680 22,680 22,680
\
1981-19WI ~ULTI-YE^R FORECAST p,\G( : -1fL..
PROGRAr-l: Conservation & Recreation Land Management - Rent and Utility Services (C5)
PURPOSE: Provision of administration of the Central Services and stores.
1981-1984 OBJECTIVES: - the provision of stock supplies, including purchasing and distribution
_ the provision of building and mechanical trades service to all Divisions of the Authority
as required
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the
balance being funded from the'General Levy on all participating municipalities.
MULTI-YEAR FORECAST 1981-1984
P ROGRA:'1: Conservation & Recreation Land Management - Rent & Utility Services (C5) PACE: ~
1980 I
I
FIN A N C I N G 1979 Bud~et Pre. Budget 1981 198? 1983 1984 I
,
Expenditures .................................... 39,000 43,280 43,280 43,280 43,280 43,28Q I
Revenues ........................................ - - - - - -
Net Expenditures ...............;.............. 39,000 43,280 43,280 43,280 43,280 43,280
Grants .......................................... 19,500 21,640 21,640 21,640 21,640 21,640
Och.::r ........................................... - - - - - 21 ~ 640 I
Levy........................................... . 19,500 2l,640 21,640 2l,640 21 ,640
39,000 43,280 43,280 43,280 43,280 I 43,280
EXPENDITURES
Staff Salaries 35,930 39,880 39,880 39,880 39,880 39,880
Vehicles 3,070 3,400 3,400 3,400 3,400 3,400
39,000 43,280 43,280 43,280 43,280 43,280
1981-1934 MULTI-YEAR FORECAST PAGE: -4!L
PROGPAN: Conservation & Recreation Land Management - Taxes and Insurance (C6)
PURPOSE: To provide for costs associated with taxes on non-revenue producing areas and liability
insurance on Authority lands and facilities under Conservation & Recreation Land Management
Progr.ams .
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all participating municipalities.
FIN~~CIAL CO~~NTS: For 1981 through 1984 we have added 5% for additional properties only. No allowance has been
made for inflation, or for any increase by virtue of market value assessment.
MULTI-YEAR FORECAST 1981-1984
P?.OGi{.,\~.! : CO:1servacion & Recreation Land l1anagement - Taxes and Insur~!l1ce (C6) PAGE: ~
1980 l
FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984
Expenditures .................................... 70,000 78,000 81,600 85,600 89,800 94.200 I
Revenues ........................................ I
- - - - - - i
~let: Exr>encicures .............................. 70,000 78,000 81,600 85,600 89.800 I 94,200 i
I
Gra:1ts .......................................... 35,000 39,000 40,800 42,800 44,900 47,100 \
I
lo<::-:e:: .... - - - - - - \
I ... .. ... ................ ...............
\ Levy ............................................ 35,000 39,000 40,800 42,800 44.900 I 47.100 :
I
, ,
70,000 78,000 81,600 85,600 89,800 94> 200 i
EXPENDITURES
Taxes. -non-revenue 60,000 67,500 70,600 74,100 77 .800 81,700
Insurance lO,OOO 10,500 11,000 11,500 l2,000 12,500 i
70,000 78,000 8l,600 85,600 89,800 94,200
1981-1984 r.ULTI-YEAR FORECAST PAGE: -5L-
PROGPA:'\: Water & Related Land Management - Waterfront Programs (\v9 )
PURPOSE: To provide administrative, planning and engineering staff necessary for implementing the
Waterfront Project.
FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and
the balance being funded from the General Levy on all parcicipating municipalities.
FINANCIAL CO!-U-IENTS: Although no increase in staffing is shown in the forecast, the responsibility for development
of Aquatic Park may require an increase in staff.
MULTI-YEAR FORECAST 1981-1984
PROGRAN: Water & Related Land Management - Waterfront Programs (W9) P .;GE : -52..-
11979 Budget 1980
FIN A N C I N G Pre. Budget 1981 1982 1983 lS84
Sx?end:.tures .................................... 66,000 71,750 71,750 71,750 71 , 750 71,7501
Revenues ........................................ - - - - - -
I
Net Expenditures .............................. 66,000 71,750 71,750 71,750 71 , 750 71,750
G::ants .......................................... 33,000 35,875 35,875 I
35,875 35,875 35.8751
Ochl::: . ... ............................................... .............................. - - - - - - I
Levy........................................... . 33,000 35.875 35,875 35,875 }5,875 35,875
66,000 71,750 71,750 71,750 71,750 71,750
EXPENDITURES I
I
Staff Salaries I
62,000 67,750 67,750 67,750 67,750 67,570 i
Travel & Expenses 4,000 4,000 4,000 4,000 4,000 4,000 I
66,000 71,750 71,750 71,750 71,750 71,750
1981-1984 MULTI-YEAR FORECAST PAGE: ~
PROGRAr-l: Special Projects _ Waterfront Plan
PURPOSE: The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline within the arca
of the Authority's jurisdiction, a handsome waterfront balanced in its land uses which will
complement adjacent .1.reas, taking cor>,niz:mc(' of existinr; residcntial development and makil,r:
available, wherever possible, features which warrant public use.
1981-1984 OBJECTIVES: - the start of developmcnc incl~ding landfilling at Colonel Sam Smith Park
- the corr:pletion of the boat harbour at Humber Eay \Jest. Phase II
- the completion of Hun:her Hay E:1s!: U.lterfront Arc.1.
_ the initiation of the Western Beaches Development
_ the completion of the boat harbour at Bluffer's Phase II
- the first phase of development of the Bluffer's Toplands
_ the initiation of development of East Point Park
_ the continuation of land acquisition to complete the link from Petticoat Creek to Frenchman's
Bay
_ the continuation of the shoreline management program
_ the continuation of the Environmental Monitoring and Assessment Programs
_ the initiation of development of Aquatic Park subject to necessary approvals
FUNDING: This is a shared program, a grant of 50% of costs is available from the Province of Ontario, the
balance being funded by the Waterfront Capital Levy on all participating municipalitics. The
Government of Canada is constructing shore protection at the Small Craft Harbour at Bluffer's
Park and a similar application has been made for Humber Bay West, Phase II.
~INANCIAL COMMENTS: 1981 is the last year of the second five-year Project for Waterfront Development and it has been
assumed that the Waterfront Development Program would be continued for a third five-year term
at a similar level of funding. The development of Aquatic Park will require the allocation of
additional funds by the Province of Ontario. The total budget allocations in 1980 and 1981
include the Supplementary Waterfront Project.
MULTI-YEAR FORECAST 1981-1984
PROG;t.~'! : Special Projects - Waterfront Plan ~A;GE: -2L..
1980 I I
F I ~ A N C I N G 1979 Bud;?ct Pre. Budp.,et 1981 1982 1983 1 ():> I I
_~J""
I ;:'''''e:1..li t"~e 2,800,000 3,130,250 3,130,250 3 ,600,000 I 3,600,000 I 3,600,080 I
-.'.f-' . ~- ...~ s ....................................
!
Revent;es ........................................ - - - - - : -
i
Ne:: Expenditures ............................... 2.800,000 3,130.250 3.130,250 3,600,000 3.600,000 I 3 600 oeo I
, , I
I I
I G~a"r" l,400,000 1.565,125 1,565,125 1,800,000 1, 800 ~ 000 I 1,800,000 I
J.. ........~ ..................................................................................
i Ger.,":- ........................................... I
- - - - - i
i LE.vy ............................................ 1,400,000 l,565,125 1.565,125 l,800,OOO 1,800,000 I 1,800, COO J
I i
2,800,000 3,130,250 3,130.250 3,600,000 3.600,000 I 3,600,000 I
\ EXPENDITURES J
I
I
I Sam Smith 50.000 50,000 50,000 - 800,000 600,000 I
Humber B.JY ~Jest l60,OOO 950,250 960,250 350,000 - - I
Humber Bay East 950,000 400,000 lOO,OOO - - 200~0001
Hestern Beaches 5,000 - - 200,000 200,000
Afju,:tic Park - 50,000 lOO,OOO 500,000 500,000 620,000 I
I Ashbridge' s Bay 5.000 40,000 10,000 - -
I Bluffer's Toplands - - - - 250 ~ 000 I 250,000
Bluffer's I & II 740,000 660,000 930,000 l,OOO,OOO -
EA.st Point 20,000 - - 220,000 320,000 400,OOCl
Ajax Haterfront - - - - - 200,000
Guild Inn - - - - 200,000 -
Shoreline Management 450,000 600,000 650,000 l,OOO,OOO I,OOO,OOO l,OOO,OOO
Salaries 50,000 80,000 80,000 80,000 80.000 80,000
Environmental Studies & Monitoring 60,000 lOO,OOO 100,000 100,000 100,000 100,000
Land Acquistion 240,000 150,000 l50,OOO 150,OOO l50,OOO l50,000
Maintena:lce 50,000 50,000 - - - -
Petticoat Creek 20,000 - - - - -
2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000
I
1981-1984 ~ULTI-YEAR FORECAST PAGE: -5L
PROGR#i: Historic Sites Development
PURPOSE: To carry out restoration and development work at Black Creek Pioneer Village in accordance
with Authority approved plans.
1981-l984 OBJECTIVES: _ to complete the restoration of the Richmond Hill Manse
_ to coreplete Phase I of the Black Creek Visitor's Cencre
FUNDING: All funding comes from The Metropolitan Toronto and Region Conservation Foundation, Wintario
and donations.
FINANCIAL CO~~1ENTS: Financing of these projects depends upon funding being available from The Metropolitan Toront0
and Region Conservation Foundation and other sources.
MULTI-YEAR FORECAST 1981-1984
?:,,'"lr,r:J ~ '.'. Historic Sitl~ D~velupm~nt P :\(;E : .-5b.~
_ .\.vu.\.."\......
I I 1S30 \ , I
i FIN A N C I N G 1979 BuJget I Pre. Budget 1981 1932 1983 ~ "8 '.
r ",.. -.., --'" -......-.s 60,000 46,000 750,000 - - - I
, ....~~t............. _~ __t.: ., ......... ..... ........................ ...... .".. ......
I
\....evn..,t:'s . - ,
!\. t,;;..;"; ............................................................................. - - - - - I
---1
I :\::: t L.:? C1 d i t: u:: c s .............................. 60,000 46,000 750,000 I
- - I -
I I
\ G::2..:ts .......................................... I -,
I
- - - - - - !
I ,
I Ocher .... 60,000 46,000 750,000 - - I - I
I LeVy.....::::::::::::::::.::::::::::::::::::::::: - - - - - I - I
I ! I
60,000 46.000 750,000 I I
I - - i -
! \ I
I EXPENDTTURES
I I
Roblin's Mill - - - - - - \
Boardwalk - - - - -
-
Bruce's Mill - - - - - -
Carriage \.Jorks - - - - - -
Doctor's House - - - - - - I
Hennonite Heeting Hall - - - - - -
Taylor Cooperage 30,000 !
- - - - - I
Sa\....yer's House 12 ,000 - - - - -
Richmond Hill Manse 18,OOO 46,000 - - - -
B.C.P.V. Visitors Centre - - 750,000 - - -
Collection - - - - - -
60,000 46,000 750,000 - - -
B-32
SCHEDULE "0
PROPOSED SCHEDULE OF FEES FOR 1980 ," - -- -
Schedule
1. In this Schedule "season" means the summer season which commences on the
1st day of April and ends on the 31st day of October in any year or the
winter season which commences on the 1st day of November and ends on the
31st day of March of the next following year.
2. The following fees shall be paid to the Authority for permits issued by the
Authority and for the occupation and use of the lands and works, vehicles,
boats, recreational facilities and services of the Authority:
(1) For parking in all conservation areas, except Black Creek,
Pal grave and Woodbridge and except Claremont during the
winter season,
(a) for one vehicle carrying less than ten passengers,
per day .......................................... $ 2. SO
(b) for an annual parking permit for one vehicle
carrying less than ten passengers, per year ...... 30.00
(c) for one vehicle carrying ten or more passengers,
per day .......................................... 15.00
(2) For a permit at Glen Haffy Extension,
(a) for the use of each fishing pond, including ve-
hicle parking for not more than twenty vehicles,
per day .......................................... ;;0.00
(b) for parking, for each vehicle in addition to the
twenty vehicles for which a fee is paid under
clause (a) ....................................... 2.50
(c) for the use of row boats, including life iackets
and oars, when used in conjunction with a permit
issued under clause (a), plus Provincial Sales
Tax, per pond, per day.. ...... ...... .... ......... 20.00
(d) for the use of the cabin, when used in conjunction
with a permit issued under clause (a), per day... 25.00
3. (1) For entrance to the Black Creek Pioneer Village from
the day the buildings open in March to the day the
buildings close in January, per day,
(a) for each person over fifteen years of age who
is not a student ................................. 3. SO
(b) for each person fifteen years of age or under
or each student with a student card ... ........... 1.00
(c) for a family, consisting of one or two adults and
their children who are fifteen years of age or
under or who are students with a student card,
maxlmum .......................................... 7 .00
(d) for each person who is sixty-five years of age
or over .......................................... 1 . SO
(e) for each person over fifteen years of age who is
part of a group of twenty-five persons or more
ent ering as a group .............................. 3.00
;-329
- 2 -
(2) For an annual permit expiring on the 31st day of
December of the year in which the permit is issued,
for entrance to the Black Creek Pioneer Village,
(a) for a family, consisting of one or two adults
and their children who are fifteen years of
age or under or who are students with a student
card............................................ . $ 25.00
(b) for an individual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00
(3) For entrance to the Black Creek Pioneer Village from the
day after the buildings close in January to the day
before the buildings open in March, per day,
(a) for each person over fifteen years of age ........ .50
(b) for each person fifteen years of age or under .... .25
(c) for a family consisting of one or two adults and
their children who are fifteen years of age or
under or who are students with a student card,
maXlmum .......................................... 1.50
4. For the use of the Heart Lake Recreation Building, the Albfon
Hills Chalet or the Bruce's Mill Beach Centre, with a min-
imum fee of $30.00 plus parking fees, per hour ..........,.. 15.00
5. (1) For the use of the Cold Creek Conservation Field Centre
meeting room with a minimum rental fee of $20.00 plus
parking fees, per hour ......................"........ 10,00
(2) For the use of kitchen facilities in conjunction with
the use of the meeting room for which a fee is paid
under subi tern 1, per hour ............................. 5.00
6. (1) For the rental of a row-boat including life jackets
and oars, in a conservation area except Glen Haffy
Extension, plus Provincial Sales Tax, per hour ........ 3.00
(2) For the rental of a canoe, including life jackets and
paddles, plus Provincial Sales Tax,
(a) per hour ......................................... 3.50
(b) per day .......................................... 15.00
( 3) For canoeing instructions for a group of at least five
people, with a reservation, including the use of a
canoe, life jackets and paddles, per group member,
(a) per half-day ...................................,. 3,50
(b) per day .......................................... 6.00
(4) For canoeing instruction courses for individuals in-
cluding the use of a canoe, life jackets and paddles ,
(a) per course per person .......................,.... 35.00
(5) For group canoeing instruction, other than a group with
a reservation, for a one hour lesson, per person ...... 2.75
- 3 - B-330
7. For a horse-drawn sleigh ride at the Black Creek Pioneer Village,
(a) for each person on an individual basis, during open
hours, per ride ....................................... $ .35
(b) for a reserved group during open hours, per half hour.. 15.00
(c) for a reserved group, from 7:15 p.m. to 8:l5 p.m. .... . 75.00
8. For a permit authorizing a corn roast or similar activity after
sunset, not including parking, in any conservation area except
Black Creek ..................................................... 25.00
9. (1) For a permit to occupy a specially designated group over-
night camp-site, including parking for up to seven nights,
(a) for a group of not more than twenty persons, per
night . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.00
(b) for each person, in addition to the twenty persons
for whom a fee is paid under clause (a), per night ... . .35
(2) For a permit to occupy a group day camp-site, including
parking, per person, per day ............................... .35
10. For a permit to occupy a individual camp-site,
(a) at Albion Hills and Cold Creek Conservation Areas,
per night ...... ... .. ............. ... .................. 5.00
(b) at the Indian Line Tourist Campground, per night . . . . . . 7.00
11. For electric power at an individual camp-site, where available,
per night . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00
12. For firewood at a conservation area named in item 10, per
bundle .......................................................... 1.00
13. For showers at Albion Hills and Indian Line Tourist Campground,
for a controlled time period .................................... .25
14. For launching a boat, not including vehicle parking, per day.... 1.00
15. For a permit for use of a conservation area for horseback riding,
not including vehicle parking,
(a) per day, per horse ..................................., 1.00
(b) per year, per horse ................................... 20.00
16. For a permit for the operation of an all terrain vehicle, not
including vehicle parking,
(a) for a daily use permit................................ 1.00
17. Except at the Black Creek Pioneer Village, for a permit for a
group picnic, not including vehicle parking,
(a) for a group of not more than 100 persons . . . . . . . . . . . . . . 10.00
(b) for each fifty persons or fewer persons in addition to
the 100 persons for whom a fee is paid under
clause (a) .......... .................................. 5,00
;- 3 3 1 - 4 -
(c) for the use of a shelter, when available, in
addition to any other fees paid under this item,
per day ............................................. $ 25.00
(d) for a fire in a ground fire pit designated for that
purpose, in addition to any other fee paid under
this item, per day .................................. 10.00
18. For use of the Petticoat Creek Swimming Area,
(a) per person, per day ................................. .50
(b) for a book of ten tickets " " " " " " " " " " " " " " " " " " " " " " " " " " " 4.00
19. For the rental of buildings and equipment at Black Creek Pioneer
Village,
(a) for the use of anyone location for a wedding
(including rehearsal) """"""""""""""""""""""""" """""" 175.00
(b) for the use of a horse and vehicle for a wedding ..., 80.00
(c) for the use of the Half-Way House Dining Room ....... 50.00
(d) for the use of a Village Building, other than for a
wedding ................................,....."..... 100.00
20. For the purposes of commercial photography or filming in that
part of the Black Creek Conservation Area known as the Black
Creek Pioneer Village,
(a) for the use of the grounds and environs,
(i) from 8:30 a.m. until midnight, per hour,
excluding staff ...................,..,...,... 35.00
(ii) from midnight until 8:30 a.m., per hour,
excluding staff ............,................. 100.00
(b) for the use of the interior of the buildings,
(i) from 8:30 a.m. until midnight, per hour,
excluding staff ......................,.".... 50.00
(ii) from midnight until 8:30 a.m., per hour,
excluding staff ..................,........... 100.00
(c) for the rental of animals and equipment, excluding
staff,
(i) for a horse and vehicle,
a. for the first hour ....................... 35,00
b. for each additional hour ....,............ 5.00
(ii) for a cow, ox or other animal,
a. for the first hour ...................,... 25.00
b. for each additional hour ................. 5.00
(d) for the rental of costumes each, per day.......,.... 16.00
- 5 - B-332
(e) for participation by staff of the Authority,
(i) in the case of a supervisor, per person,
per hour,
a. during open hours .......... ...................................... $ 10.00
b. after open hours ...... .................... ........................ 15.00
c. after midnight ........ .. ...... .... ................ .................. 25.00
(ii) in the case of security or maintenance
personnel, per person, per hour,
a. during open hours .. .... .................. .......... ............ 10.00
b. after open hours .......... ...................................... 15.00
c. after midnight .............................. ...... ................ 25.00
(iii) in the case of livestock handlers and drivers,
per person, per hour,
a. during open hours ........ ................................ ...... 7.00
b. after open hours .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 10,50
c. after midnight .................... ................................ 25.00
(iv) in the case of models or any other employees
of the Authority, per person, per hour,
a. during open hours ............ .................................. 7,00
b. after open hours .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 10.50
c. after midnight .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 15.00
21. For commerical photography or filming in any conservation area,
except that part of the Black Creek Conservation Area known
as Black Creek Pioneer Village,
(a) for the use of the grounds and environs, excluding
staff and equipment, per hour .... ........ .... ...... 15.00
(b) for participation by staff of the Authority,
(i) during the usual working hours of the
staff member, per person, per hour .......... 10,00
(ii) after the usual working hours of the staff
member, per person, per hour ................ 15.00
(c) for use of Authority vehicles or tractors, including
Authority staff to operate such vehicles or tractors,
(i) during the usual working hours of the staff
member, per vehicle, per hour .,...........,. 15.00
(ii) after the usual working hours of the staff
member, per vehicle, per hour ............... 20.00
22. For school visits at Black Creek Pioneer Village,
(a) for conducted tours, Monday to Friday, per student,
per tour ........................................... 1.00
~- 3 3 3 - 6 -
(b) for the Christmas tour, per student, per tour ...,.. $ 2.50
(c) for the Pioneer Craft Program, per student, per
program ......................................,..... 2.50
(d) for the Dickson Hill School Program, per student,
per day ............................................ 1.25
23. For entrance to the Kortright Centre for Conservation,
(a) for each person over fifteen years of age who is not
a student, per day ..................,...........,.. 1.00
(b) for each person fifteen years of age or under, or each
student with a student card, per day....,.....,.... .75
(c) for family consisting of one or two adults and their
children who are fifteen years of age or under or
who are students with a student card, maximum ...... 3.00
(d) for each person fifteen years of age or under or
student who is part of a group of twenty-five
persons or more, per person, per hour of program ... .50
(e) for an annual permit expiring on the 31st day of
December in the year in which it was issued,
(i) for a family consisting of one or two adults
and their children who are fifteen years of
age or under and who are students with a
student card, per annum .................,... 25.00
(ii) for an individual, per annum ..... .....,...,. 15.00
24. For the use of a rifle range at the Cold Creek Conservation
Area,
(a) for a daily permit, per person .................".. 1.00
(b) for a group permit, not including week-ends or
holidays, per season .......,....................,.. 50.00
(c) for a special event permit . . . . . . . . . . . . . . . . . . . . . . . . . 10.00
25. For the use of an archery range at the Cold Creek Conservation
Area,
(a) for a daily permit, per person ............,........ .50
(b) for a season group permit, not including week-ends
or hol idays ........................................ 50.00
(c) for a special event permit .. ... ................. ... 10.00
26. For a special event permit for the use of the trap range at the
Cold Creek Conservation Area, per event . . . . . . . . . . . . . . . . . . . . . 10.00
27. (1) For the use of an electric trap at the Cold Creek Conser-
vation Area,
(a) per day, per person ................,......,........ 1.00
(b) a group permit, per season. ... ...................., 100.00
(2) For twenty-five clay birds for use with an electric trap,
plus Provincial Sales Tax ............................... 1.50
- 7 - B-334
28. For the use of a manual trap at the Cold Creek Conservation Area for
use by up to five persons,
(a) on Saturdays and holidays in the summer season,
maximum of one hour ..............,................,. $ 2,00
(b) on Sundays, in the summer season, maximum of one hour 3.00
(c) on week days, other than holidays, in the summer
season . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.00
(d) on any day during the winter season ..,.............. 2.00
29. For dog trails, at the Cold Creek Conservation Area,
(a) for a group permit, per season .......,.............. 50.00
(b) for a special event permit . . . . . . . . . . . . . . . . . . . . . . . . . . 10.00
30. For a guided tour, during the maple syrup operation at Bruce's
Mill Conservation Area, per person ........................... .50
31. Subject to items 33 and 34, for the rental of ski equipment,
when available, consisting of skis, boots and poles,
(a) for cross-country skiing,
(i) for individuals fifteen years of age or over,
plus P. S. T. , per day ..................... 7.00
after 1:00 p.m............... 5.00
(ii) for individuals under fifteen years of age,
plus P. S . T . , per day ..................... 5,00
after 1: 00 p.m............... 3.50
(b) for downhill skiing, excluding the use of the ski
lift,
(i) for individuals fifteen years of age or over,
p I us P. S . T . , per day .......,............, 7.00
after 1:00 p.m............... 5.00
(ii) for individuals under fifteen years of age,
plus P.S.T., per day .....".............. 5.00
after 1:00 p.m............... 3.50
32. For the rental of snowshoes, when available, plus P.S.T., per day
(a) for individuals fifteen years of age or over ........ 3.00
(b) for individuals under fifteen years of age ........., 2,00
(c) for each individual in a group, with a reservation ,. 2.00
(d) for each individual in a group including planned
activity ............................................ 5.00
33. For each individual in a group, with a reservation, for cross
country ski instruction, including the use of ski equipment
and trai 1 s, per day ........................................... 5.50
34. (1) For the use of a ski lift for downhill skiing, for an ind-
ividual equipped with downhill ski equipment, not including
parking, per day ,...........,................"..,....... 3.00
~- 33 5
- 8 -
(2) For the use of cross-country ski trails at Albion Hills and
Bruce's Mill, for an individual equipped with cross-country
ski equipment, not including vehicle parking, per day,
(a) for each person fifteen years of age or over ........ $ 1.00
(b) for each person under fifteen years of age .......... .50
(3) For the use of a ski lift for downhill skiing for a group
with a reservation, a minimum fee of $100, per day to be
charged as follows:-
(a) for the use of the ski lift only, per person ........ 2,00
(b) for the use of the ski lift and downhill ski instruc-
tion, per person ................................... . 4.00
(c) for the use of the ski lift and for rental of down-
hill ski equipment as described in item 31, per
person .............................................. 5.00
(d) for the use of the ski lift, downhill ski instruction
and the rental of downhill ski equipment as described
in item 31, per person .............................. 7.00
35. For entrance to the Claremont and Palgrave Conservation Areas
during the winter season, per day,
(a) for each person fifteen years of age or over ........ 1.00
(b) for each person under fifteen years of age .......... .50
36. For group cross-country skiing instruction, other than a group
with a reservation, not including parking,
(a) for persons fifteen years of age or over, for a l~
hour lesson, per person . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.50
(b) for persons under the age of fifteen years, for a
l~ hour lesson, per person. ......................... 2.25
37. For group downhill skiing instruction, other than a group with
a reservation, not including parking,
(a) for a one hour lesson, per person, fifteen years
of age or over ...................................... 4.00
(b) for a one hour lesson, per person, under fifteen
years of age ..............................,.",..,.. 3,00
38. For individual one hour lessons for downhill or cross-country
skiing, when available, per person .. .......................... 6.00
39. For fishing bait at Heart Lake and Glen Haffy Conservation
Areas, per box ................................................ 2.00
40. For firewood, including delivery within a radius of thirty-two
kilometers of the source of such firewood, per cubic metre .... 35.00
41. For the use of Cold Creek Conservation Field Centre,
(a) for a day program for school children in grade 6 or
any grade higher than grade 6 per person, per day... 5.00
- 9 - B-33 6
(b) for a bog walk for school children in grade 5 or any
grade higher than grade 5 with a maximum group of
thirty persons and a minimum charge of $15 per group,
per person ..... ...... . ............ .................. $ .75
(c) for overnight camping for a minimum of ten persons
to a maximum of thirty persons, including tents and
firewood, per person, per night . . . . . . . . . . . . . . . . . . . . . 2.50
(d) for the rental of a winter sleeping bag, per night . . .75
42. For the Albion Hills Conservation Area Farm Program,
(a) for a Farm Tour lasting approximately one hour, for
school children in any grade, with a minimum charge
of $15 per tour and a maximum group size of forty
persons, per person, per tour ....................... .75
(b) for a Farm Tour lasting approximately two hours, for
school children in grade 8 or any grade higher than
grade 8, with a minimum charge of $30 per tour and
a maximum group size of forty persons, per person,
per tour .............................,.............. 1.50
(c) for the Farm Work Program for school children in
grade 6 or any grade higher than grade 6, with a
minimum charge of $20 per day and a maximum group
size of twenty persons, per person, per day......... 2.00
(d) for the Farm Pioneer Life Program for school children
in grade 4 or any grade higher than grade 4, with a
minimum charge of $60 per day and a maximum group
size of forty persons, per person, per day.......... 3.00
(e) for the Farm Maple Syrup Program for school children
in grade 4 or any grade higher than grade 4, with a
minimum charge of $60 per day and a maximum group
size of forty persons, per person, per day.......... 3.00
43. For the Albion House Program,
(a) for the half day Pioneer Life Program for school
children in grade 4 or any grade higher than grade
4, with a minimum charge of $20 and a maximum group
size of twenty persons, per person, per day......... 2.00
(b) for the full day Pioneer Life Program for school
children in grade 4 or any grade higher than grade 4,
with a minimum charge of $35 and a maximum group size
of twenty persons, per person, per day......,....... 3.50
44. For the Conservation Education Program, per day,
(a) at Albion Hills Conservation Field Centre ,.,......., 535,00
(b) at Claremont Conservation Field Centre ........,..... 535,00
45. For the purchase of,
(a) wildlife shrubs, per shrub .......................... .50
(b) farm trees, per tree ................................ 3.00
B-337
SCHEDULE liE II
TO: The Chairman and Members of the Executive Committee, M.T.R.C.A.
Mee ting #15/1.9, Thursday-October-4-1979
FROM: W.A. McLean, Director, Planning and Policy
RE: REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO
In June, 1979, the Authority received the Report of the Working Group on the
Mandate and Role of the Conservation Authorities in Ontario. With this report
was a request from The Honourable James A.C. Auld, Minister of Natural
Resources:
"that each Conservation Authority provide copies of the report to
its member municipalities, review the recommendations with the
municipalities and ensure that municipal concerns and comments are
included in the Authority's response to the document".
In this connection, the Executive Committee at its Meeting #9/79 held
June 27, 1979, resolved:
"THAT the communication from The Honourable James A.C. Auld, Minister
of Natural Resources and the Report of the working Group on the Mandate
and Role of the Conservation Authorities of Ontario be received and
appended to the Minutes; and
THAT copies of the Minister's letter and the Report be circulated to
the Authority's member municipalities for comment by August 15, 1979:
and
FURTHER THAT following receipt of municipal comments, staff be
directed to prepare a report and recommendations for consideration
by the Executive Committee."
Subsequent to this information being forwarded to the municipalities, the
Ministry extended the deadline for comment and the Authority revised its
request accordingly to september 21, 1979.
Municipal Response:
The following municipalities have submitted responses to the Authority's
request for comments:
Metropolitan Toronto Region of York
City of North York Town of Markham
Borough of Scarborough Town of Richmond Hill
Borough of East York Town of Whitchurch-Stouffville
Region of Durham Township of Mono
Town of Ajax Township of Adjala.
The following municipalities have advised the Authority that comments will be
prepared, however, have not been able to supply this information, to date:
Borough of Etobicoke
City of Toronto
City of Mississauga.
Of the comments received the following approved/endorsed the position stated
by the Working Group or indicated that their municipality had no comment:
Township of Adjala (no comment)
Town of Ajax (endorsed)
City of North York (approved)
Borough of East York (support)
Town of Markham (endorsed)
Town of Richmond Hill (concurred)
Town of Whitchurch-Stouffville (no comment).
The Region of Durham requested the Minister for an extension to the deadline
initially established and recommended:
"That the Conservation Authorities, in the preparation of water
management projects and other programs be required to work in
conjunction and cooperation with municipalities during the
formulative stages and that all such plans, projects and programs
be circulated to the municipalities for comment on compatibility
with municipal plans and financing prior to finalization of the
n1"n_ nro;ect or proqram. "
B-333
REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 2
The Borough of Scarborough reviewed the report and stated that:
"In general we support the conclusions of the Working Group but
would comment that the matter of financing should have been given
greater consideration.
Recommendation: l. That Council concur in principle with the
conclusions of the task force.
2. That the revisions of the Planning Act presently
under consideration by the Ministry of Housing
contain references to the role of Conservation
Authorities and provide for the resolution of
conflicts and the combining of objectives.
3. That the Task Force be asked that further
consideration be given to improved, more reliable
methods of financing of Conservation Authority
programs, and land acquisition.
4. That these recommendations, together with this
report be forwarded to the M.T.R.C.A. in accordance
with their request."
Metropolitan Toronto referred the working Group report to the Parks, Recrea-
tion and Property committee which prepared an analysis of the Report and
submitted the following comment and recommendations:
"In general terms, the following notes are intended to provide a
brief overview of the relationship between Municipality, Conservation
Authority, and the Province, in order to attempt to articulate some
helpful comments to the Ministry of Natural Resources:
_ The prime purposes of a Conservation Authority should be the
protection of human life and property organized on the basis of
watershed management.
_ As an ancillary part of its programmes, Authorities may undertake
programmes related to recreation, education, historical programmes,
and forestry and wildlife management programmes.
- Once an Authority is formed, it becomes an autonomous special purpose
body and a mewDer municipality cannot opt out and is bound to
contribute its share of various levies.
_ If the Authority-member municipality relationship is sound, the
Authority will in effect undertake programmes which are acceptable
to its members.
_ Since a Municipal/Provincial cost sharing basis exists, Authorities
are affected by the financial limitations of either party, and these
limitations are of prime importance to the operation of an Authority.
It must be understood that in general in the 1950's and early 1960's,
the limitation on such funding normally existed at the Municipal levell
more recently the limitation has been imposed at the provincial level.
- As the era of financial restraint has approached, it has become more
and more difficult for Authorities, and hence its member municipality
representatives, to achieve an acceptable balance between the
fundamental programmes of an Authority and its perhaps more visible
ancillary programmes.
_ The only real opportunity that a member municipality has to influence
either the day-to-day or long-term ambitions of the Authority is
through its appointed representatives.
_ Unless these representatives have a clear understanding of the goals
and objectives of the 'member municipality, it is difficult to ensure
that the Autho!ity will be so influenced.
- It therefore follows that the municipality should clearly articulate
its goals and objectives periodically in this regard, and its
representatives should be appointed on the basis of their belief in
them and willingness to articulate them at Authority meetings.
- It also follows that as times change these representatives should
_1...____ __-" ,.. _~_"'~~~ ..,,,,,1,.1 ho 11C:OTll1 Tor Council to consider a
B-33 9
REPORT OF TilE WORKING GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 3
review of its membership to ensure that there is both continuity
with respect to input and, conversely, that the membership is
rotated to ensure that current thinking may be introduced.
- Finally, it is most important to note that in a relationship such as
exists between ~Ietropol i tan Toronto and The Metropolitan Toronto and
Region Conservation Authority, the Province must be urged to provide
additional financing to the Authority for its prime functions.
Metropolitan Toronto is impacted by development in surrounding
regions, particularly in upstream areas, and watershed management
techniques are most critical at this time. In fact, in large part
programmes of the Authority are programmes of this municipality and
the limitations imposed on funding at the Provincial level are
tending to distort priorities as perceived at the Municipal level.
A review of the foregoing indicates that, in an era of restraint such
as we are now in, it is most important that this municipality clearly
articulate its goals and objectives as they relate to The Metropolitan
Toronto and Region Conservation Authority for the'coming ten-year
period. Your Committee is the appropriate body to undertake this task,
together with the staff of the Authority and the staffs of this
Department and the Planning Department.
It is equally important that Council appoint its representatives to the
Authority on the basis of their belief in these goals and objectives
and the representatives' willingness to work toward their achievement
at the Authority level.
Lastly, it is important that the Ministry of Natural Resources understand
fully the necessity of providing adequate funding at the Provincial
level for the prime functions of the Authority in order that watershed
management programmes in Metropolitan Toronto and its surrounding region
provide adequate protection for human life and property of Metropolitan
citizens.
Accordingly, I recommend that:
1) your Committee forward these comments to The Metropolitan Toronto
and Region Conservation Authority as input to its response to the
Minister of Natural Resources 1
2) your Committee develop a mechanism to provide Council with a
statement of goals and objectives for The Metropolitan Toronto
and Region Conservation Authority for the period 1981-1990 during
the year 1980:
3) following the preparation and approval of this statement by Council,
Metropolitan Toronto appointees to the Authority be made on the
basis that such members will vigorously pursue these goals and
objectives at Authority meetings: and
4) the Minister of Natural Resources be advised that, while this
municipality believes in the validity of watershed management by
Conservation Authorities, such Authorities must receive increased
funding at the Provincial level for their prime function of
watershed management if these special purpose bodies are to
continue to serve the requirements of their member municipalities."
The Regional Municipality of York considered a staff review which presented
the following points for consideration:
"Since the review does not suggest major changes, its endorsement
by Regional Council would support the present role of the Conservation
Authorities. Since their operations in the past have on the whole
been positive, a general endorsement of the review is recommended.
There are, however, some specific issues raised in the report that
must be highlighted and in some cases a word of caution raised.
1) There should be a detailed clarification of the Conservation
Authorities goals, policies and implementation techniques which
should be stated in the Watershed Plan. This Plan in its effort
to be comprehensive should ~ become ~ surrogate official pla~.
The preparation of a Watershed Plan should involve close Munic1pal
liaison at all staqes of preparation.
B-3 40
REPORT OF THE WORKI~G GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 4
2) It is important to re-emphasize that Regional Council plays
an important role in the Conservation movement through funding
and the appointment of members to Conservation Authorities.
Conservation Authorities should endeavour to keep the Councils
of participating Municipalities well informed of their objectives
and programs. This communication and cooperation is essential
for the efficient and effective conservation of our resources.
3) Many Municipalities have two or more Conservation Authorities
within their boundaries. In such a case adjacent Conservation
Authorities should cooperate to insure that their approaches and
policies are compatible so as not to confuse the public and
complicate Regional Land Use Planning.
4) The legislative mandate in the "Conservation Authorities Act" is
very broad. The specific responsibilities of Authorities should
be established in consultation with participating municipalities."
Council subsequently adopted the following recommendations, in this
connection:
" 1) Planning Committee and Council endorse the comments of its
staff regarding this document.
2) Copies of this report be forwarded to both The Metropolitan
Toronto and Region Conservation Authority and to the South
Lake Simcoe Conservation Authority, to the Conservation
Authorities' Branch, Ministry of Natural Resources and A.C.R.O.
3) Copies of this report and the A.C.R.O. brief be forwarded to
the area municipalities of York for information."
The A.C.R.O. brief referred to in this recommendation is that prepared by The
Association of Counties and Regions of Ontario. The Minister in circulating
the Report of the Working Group also requested comment from a number of
municipal associations, one of which was A.C.R.O. While the Authority was
not requested by the Minister to include the responses of such groups in its
review of the Report, the following summary of the concerns of A.C.R.O. are
provided, as information, since they are referred to by the Region of York
and have been endorsed by one of the Authority's member municipalities, the
Township of Mono. The following points are made in the A.C.R.O. response:
- conservation authorities are special purpose bodies viewed with
increasing concern by municipalities
- conservation authorities should limit their activities to water
management
- preliminary conservation authority budgets should be circulated to
all member municipalities for comment in advance of adoption by an
authority
- the parks and recreation role of authorities be limited to providing
intermunicipal populations with natural resource based opportunities
- there is'a serious lack of "local initiative and involvement" in
conservation authorities in many parts of the Province
- conservation authorities should not have as broad a mandate as stated
in the Act, ie. should be concentrating on flood and erosion control
and direct water management
- supports the preparation of a Watershed Plan but is concerned with
its relationship to local official plans
- supports the authorities' role in flood and erosion control, however,
is not convinced that such a body is the only means of achieving these
objectives
- while recognizing the "impact of land use decisions on flood and erosion
control feels that development control should be achieved through
local planning'process: this is also sufficient to protect unique
and sensitive resources
- authorities should only acquire lands essential for primary objectives
and not because they are marginal or for purposes of forest
management, fish and wildlife habitat improvement, outdoor recreation
or conservation education
8-34 1 .
REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE
OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 5
_ support the management of authority lands by others for those uses
which do not relate direc~ly to flood and erosion control ana wa~er
management
- strongly opposes the assignment of additional .program responsibilities
to authorities
_ recommends that all appointees to authorities be municipal elected
representatives appointed by municipal councils
_ agrees that increased communication with municipalities and the public
is required
_ believes there should be a clearer delineation of responsibilities
between authorities and the district ofjices of the Ministry of
Natural Resources and that the Ministry not delegate further
responsibility to authorities.
Summary:
Generally, the Authority's member municipalities have supported and endorsed
the Report of the Working Group as a conceptual framework within which the
specific areas of Authority activity can be defined. This seems an appropriate
response in that the working Group is attempting to produce a general policy
document for thirty-nine conservation authorities, each of which will have
specific resource management problems to address within their areas of
jurisdiction.
RECOMMENDATIONS:
IT IS RECOMMENDED THAT the Executive Committee inform the Ministry of
Natural Resources of its support of the recommendations of the Report of the
Working Group on the Mandate and Role of the Conservation Authorities of
OntarioJ and
THAT the staff report concerning the municipal responses to the Report of the
Working Group be received and forwarded, along with copies of each
municipality's individual comment, to the Ministry of Natural ResourcesJ and
FURTHER THAT copies of any subsequent municipal replies, received too late
for inclusion in this report, also be forwarded to the Ministry.
1979.09.25.
ACD/mm
~ B-342
,
the metropolitan toronto and region conservation authority
minutes Report #16/79
EXECUTIVE co~mITTEE WEDNESDAY-OCTOBER-24-1979 116/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, October 24, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
Mrs. J.A. Gardner
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Adm. - Historical Sites Division R.K. Cooper
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Planning Technician, Planning & Policy Miss A. Aitken
Research Planner, Planning & Policy Mrs. A.C. Deans
Project Planner, Water Resource Division T.E. Farrell
Development Co-ordinator, Planning & Policy J.W. Maletich
HEARING
Following the Roll Call, the meeting recessed to hold a Hearing re:
Mr. Antonio Ieraci
Town of Markham
Rouge River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Planning Technician, Planning & Policy Miss A. Aitken
Research Planner, Planning & Policy Mrs. A,C. Deans
Head, Waterfront Section, WRD B.E. Denney
Development Co-ordinator, Planning & Policy J.W. Maletich
Supervisor, Accounting Services, FD Mrs. M. Mosseau
Supervisor, Property Administration, P&AD D.J. Prince
B-343 -2-
ABSENT WERE
Members M,J. Breen
E.H. Card
MINUTES
The Minutes of Meeting #15/79 were presented.
Res. #424 Moved by: C.F, Kline
Seconded by: MrS, J.A. Gardner
RESOLVED THAT: The Minutes of Meeting #15/79, as presented, be adopted as if read.
CARRIED ~
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS ITS ADOPTION:
l. INFORMATION & EDUCATION DIVISION
-1979 Budget Revisions
Water & Related Land Land Management - Community Relations
(Deve lopmen t) W.IO:
Lake St. George Conservation Field Centre
A staff communication was presented regarding adjustments to the 1979 BUdget
for the Information & Education Division.
Res. #425 Moved by: Dr. T.H. Leith
Seconded by: Mrs, F. Gell
RESOLVED THAT: The 1979 Budget Revisions to Water and Related Land Management -
Community Relations (Development ) (W.IO) , be received and appended as Schedule
"A" of these Minutes~ and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions to Water and
Related Land Management - Community Relations (Development) (W.IO) be included
in the 1979 Budget Estimates of the Authority.
CARRIED~
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
2. STAFF FINANCIAL PROGRESS REPORI'
-July 1 - September 30, 1979
The staff presented a Financial Progress Report for the period July 1 to
September 30, 1979.
Res. #426 Moved by: M.W.H. Biggar
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Staff Financial Progress Report for the period July 1 to
September 30, 1979, be received and appended as Schedule "B" of these Minutes.
CARRIED ~
MRS. GARDNER requested that a letter be written to the Council of the City of
Toronto advising them of the shoreline stabilization work and boardwalk
reconstruction proposed at the Eastern Beaches.
3. 17TH BIENNIAL CONFERENCE: CONSERVATION AUTHORITIES
OF ONTARIO, WANDLYN INN, TRENTON, ONTARIO,
SEPTEMBER 15-16-17, 1980
A staff communication .was presented advising that a request has been received
from the Lower Trent Region Conservation Authority to forward preregistration
advice regarding the above-noted conference to them no later than November 1,
1979.
-3- B-344
Res. #427 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: The Secretary-Treasurer be requested to advise the Lower Trent
Region Conservation Authority that The Metropolitan Toronto and Region
Conservation Authority expects to register 12 delegates to the 17th Biennial
Conference of Conservation Authorities scheduled for September 15-16-17, 1980
at the Wandlyn Inn, Trenton, Ontario.
CARRIED;
4. AUTHORITY ANNUAL DINNER -AND-
STAFF CHRISTMAS PARTY
Res. #428 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Secretary-Treasurer be authorized and directed to make such
arrangements as may be necessary for:
(a) The Annual Dinner of the Authority at the
Weston Golf and Country Club -
Wednesday, December 5, 1979;
(b) The Annual Staff Christmas Party -
Saturday, December 15, 1979.
CARRIED;
5. QUOTATION #79-45
-1979 MF-30B Diesel Tractor with Loader
A staff communication was presented advising that the following quotations have
been received for the supply and delivery of one MF-30B Diesel Tractor with
Loader, on a trade-in basis:
Don Vallance Equipment Ltd. $15,782.50
Edwards Equipment $17,387.50
Sholdice Service $18,993.75
Rumble Tractor $20,330.00
The above prices include all taxes.
Res. #429 Moved by: J.S. Scott
Seconded by: M.W.H. Biggar
RESOL VED THA T: The quotation received from Don Vallance Equipment Limited for
the supply and delivery of one new 1979 MF-30B Diesel Tractor, with Loader, on
a trade-in basis, in the sum of $15,782.50, including all taxes, be accepted~
it being the lowest quotation received.
CARRIED;
6. ALBION HILLS CONSERVATION AREA
-Quotation #79-52 : Camp Supervisor's Office/Residence,
Windows
A staff communication was presented advising that the following quotations (of
3 invitations) have been received for the supply of 15 Aluminum Frame Windows,
double glazed, with screens for the Camp Supervisor's Office/Residence at the
Albion Hills Conservation Area:
Thermoseal Industries Ltd. $ 1,759.80
A.N.C. Glass Products Ltd. $ 1,950.00
The above prices include Federal Sales Tax
Provincial Sales Tax exempt
Res. #430 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The quotation received from Thermoseal Industries Limited for
the supply of 15 Aluminum Frame Windows, double glazed, with screens, for the
Camp Supervisor's Office/Residence, Albion Hills Conservation Area, in the sum
of $1,759.80, including Federal Sales Tax (Provincial Sales Tax exempt), be
accepted; it being the lowest quotation received.
CARRIED;
B-345 -4-
7. QUOTATION #79-50
-Fire Pump
A staff communication was presented advising that the following quotation has
been received from Wajax Industries Limited for the supply of one new Mark III
Fire Pump:
Wajax Industries Limited $1,393.72
This price includes all taxes
Res. #431 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The quotation received from Wajax Industries Limited for the
supply of one new Mark III Fire Pump, in the sum of $1,393.72, including all
taxes, be accepted; it being the only suitable equipment available,
CARRIED;
8. GLEN HAFFY AND HEART LAKE CONSERVATION AREAS
-Quotation #79-47: Rainbow Trout
A staff communication was presented advising that the following quotation has
been received for the supply of 45,000 Rainbow Trout fry for rearing at the
Glen Haffy hatchery to supply the Glen Haffy and Heart Lake ponds:
Spring Valley Trout Hatchery $28.00/M
This was the only quotation received (of 5 invitations).
Res. #432 Moved by: Dr. T.H, Leith
Seconded by: C.F. Kline
RESOL VED THAT: The quotation received from Spring Valley Trout Hatchery, for
the supply of 45,000 Rainbow Trout fry for the Glen Haffy hatchery, in the sum
of $28.00/M, be accepted; it being the only quotation received.
CARRIED,
9. COLD CREEK CONSERVATION AREA
-Quotation #79-44B: Trap Range Control Building
A staff communication was presented advising that the following quotations have
been received for the supply, delivery and erection of a prefabricated
structure of app~ximately 900 sq.ft., on a foundation supplied by the
Authority, at the Cold Creek Conservation Area. Plumbing, electrical and
septic systems will be carried out by Authority staff or by sub-contractors.
Viceroy Homes $16,857,00
Colonial Homes Limited $19,555,00
Precision Homes Corp. Inc. $23,649.50
Pacific Prefab Limited $24,045.00
Valhalla Homes Limited $26,800,00
All prices include Federal Sales Tax
Res. 1433 Moved by: Dr. T.H. Leith
Seconded by: C,F, Kline
RESOLVED THAT: The quotation received from Viceroy Homes for the supply,
delivery and erection of a prefabricated structure of 960 sq.ft., including
40' x 8' porch, in the sum of $16,857.00, including Federal Sales Tax, be
accepted; it being the lowest quotation received.
CARRIED,
10. ALBION HILLS & COLD CREEK CONSERVATION AREAS
-Quotation 179-51: Septic Systems
A staff communication was presented advising that the following quotations (of
5 invitationsl have been received for the supply of all materials and labour
for the installation of two septic systems: one system will service the Albion
Hills Campground Supervisor's Office/Residence; the second is required in con-
junction with the Trap Range Control Building to be constructed at the Cold
Creek Conservation Area:
-5- B-346
Albion Hills Cold Creek
John Scoles Septic Pumping $1,100.00 $1,800.00
J. Barry Smith $1,268.80 $2,787.00
Res. #434 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The quotations received from John Scoles Septic Pumping for
the material and installation of a septic system to service the Albion Hills
Campground Supervisor's Office/Residence, in the sum of $1,100.00; and a
septic system to service the Cold Creek Trap Range Control Building, in the
sum of $1,800.00, be accepted; these being the lowest quotations received.
CARRIED;
11. DECISION OF HEARING
-Mr. Antonio Ieraci
Town of Markham
Rouge River Watershed
Res. #435 Moved by: Mrs. J.A. Gardner
Seconded by: J.S. Scott
BE IT RESOLVED THAT: This Executive Committee confirm the decision of the
Hearing held this 24th day of October, 1979; and
THAT the application of Mr. Antonio Ieraci, in accordance with Ontario
Regulation 735/73, for permission to place fill and erect two single-
family dwellings on Lots 40 and 41, Plan 173, located on the south side
of Nelson Street at Magill Street, Town of Markham (Rouge River water-
shed) , be refused for the following reason:
.That the application, as submitted, will affect
the conservation of land.
CARRIED;
12. FINANCIAL REPORT AND ACCOUNTS
-September, 1979
Mr. Scott presented the Financial Report and Accounts for the month of
September, 1979.
Res. #436 Moved by: Mrs. J.A. Gardner
Seconded by: J.S. Scott
RESOLVED THAT: The Financial Statement for the month of September be
received; and that the payment of the Authority accounts, in the amount of
$1,263,680.00, being (a) Current Expenditures - Wages and Salaries
$471,565.65; Materials & Supplies $317,833.45; (b) Capital Expenditures -
Wages & Salaries $45,858.66; Materials & Supplies $415,248.52; and (c)
Other Programs - Wages & Salaries $8,912.62; Materials & Supplies $4,261.10,
be approved.
CARRIED;
13. ANNUAL GLOBAL PROFESSIONAL DAY -
PROTESTANT SCHOOL BOARD OF GREATER HULL,
FRIDAY, NOVEMB ER 2, 1979
-Attendance at
A staff communication was presented advising that Miss Ann Hayhoe has been
invited to attend the Annual Global Professional Day, sponsored by the
Protestant School Board of Greater Hull, on Friday, November 2, 1979. The
School Board has offered to pay Miss Hayhoe's expenses in this connection.
Res, 1437 Moved by: Dr. T,H. Leith
Seconded by: E.V. Kolb
RESOLVED THAT: Miss Ann Hayhoe, Head, Education Section, Information and
Education Division, be authorized to attend the Annual Global Professional
Day to be held at Hull, Quebec, November 2, 1979, in place of the Ontario
Museum Association Conference in Barrie, Ontario (authorized at Executive
Meeting 14/79) .
CARlUEDJ
B-347 -6-
14. REVIEW OF THE REGIONAL MUNICIPALITY
OF DURHAM ACT
A staff communication was presented, advising that at Executive Committee
Meeting #15/79, held October 4, 1979, a communication was received from the
Council of The Regional Municipality of Durham, inviting the Authority to
submit a brief for consideration in connection with a review of The Regional
Municipality of Durham Act (Bill 162). As directed by Committee, staff
presented a brief for consideration.
Res. #438 Moved by: E.V. Kolb
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The "Submission to The Regional Municipality of Durham
Concerning the Review of The Regional Municipality of Durham Act, The
Metropolitan Toronto and Region Conservation Authority" be approved and
forwarded to The Regional Municipality of Durham; and
THAT Mrs. S. Martin and Mr. J.S. Scott, as members of theR.D.H.P. Advisory
Board serving on the Executive Committee, and Mr. W.A. McLean, Director of
Planning and Policy, represent the Authority in presenting this submission
at the Public Meeting to be held in Pickering on November 1, 1979.
CARRIED;
15. WATERSHED PLAN PREPARATION
A staff communication was presented advising that the bulk of the background
studies required to provide a data base for the Watershed Plan is now com-
pleted and work is progressing toward the finalization of the various
program components.
The work has been separated into two major components - Water and Related
Land Management and Conservation and Recreation Land Management. There
remains a considerable overlap wherein certain parts cannot be finalized
before others; e.g. conservation and recreation land management plans cannot
be finalized for areas with proposed reservoirs until such time as the flood
control requirements are identified and the flood control component
finalized.
As each draft program component is completed, this information is being
forwarded for discussion at the appropriate Advisory Board. In addition,
Staff is presenting this information to municipal staff for review.
Res. #439 Moved by: Mrs. S. Martin
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff report regarding the progress of Watershed Plan
preparation be received.
CARRIED;
16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. & Mrs. John Darroch
To place fill at 41 Springbank Avenue, Borough of
Scarborough (Waterfront)
A staff communication was presented advising that an application has been
received from Mr. & Mrs. J. Darroch to place fill at the rear of their
property at the above location.
Res. #440 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Mr.
& Mrs. John Darroch, be received; and
THAT the application of Mr. & Mrs. John Darroch for a permit to place fill
at 41 Springbank Avenue, Borough of Scarborough, be approved, subject to:
(a) All necessary safety precautions being taken for the trucks dumping,
as well as for people walking along the beach;
(b) Clean, solid rubble only being used, and all landfill being to the
satisfaction of the Authority;
-7- B-348
(c) Supervision of dumping being provided for all hours of operation;
(d) Approvals being received from adjacent property owners if their
property is affected;
(e) Owners carrying out final slope rehabilitation in the form of
seeding and/or tree planting;
(f) All other necessary approvals and permits being obtained;
(g) The Authority being notified at least one week prior to the start
of dumping.
CARRIED;
17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Family Leisure Centres of Canada Limited
To install a PVC watermain and two polyethylene force-
mains crossing tributary of the Don River, south of
Major Mackenzie Drive, west of Keele Street, Town 0 f
Vaughan (Don River Watershed)
A staff communication was presented advising that an application has been
received from The Family Leisure Centres of Canada Limited for permission
to install a watermain and two forcemains across a tributary of the Don
River at the above location.
Res. #441 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
The Family Leisure Centres of Canada Limited, be received; and
THAT the application of The Family Leisure Centres of Canada Limited for
permission to install a watermain and two forcemains across the Don River
on Lot 19, Concession 4 (Don River watershed) , be approved, subject to:
.All areas disturbed due to construction being restored to the
satisfaction of The Metropolitan Toronto and Region
Conservation Authority.
CARRIED;
18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ian W. Nicholl, Architect -on behalf of-
John A. Coates
To place fill and erect a dwelling in the Hamlet of
Whi tevale, also known as Part Lot 32, Concession 5,
Town of Pickering (Duffin Creek Watershed)
A staff communication was presented advising that an application has been
received from Ian W. Nicholl, Architect, on behalf of John A. Coates, for
permission to alter the grades at the above-noted site.
Res. #442 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The application of Ian W. Nicholl, Architect, on behalf of
John A. Coates, for a permit to place fill and erect a dwelling in the
Hamlet of Whitevale, Part of Lot 32, Concession 5, Town of Pickering (Duff in
Creek watershed), be approved, subj ect to:
.Site grading taking place in accordance with the site plan, Project
No. 1479, Drawing #2, prepared by Ian W. Nicholl, Architect, and
dated September 24, 1979, which forms part of the permit, and to
the satisfaction of the Authority and of the Town of Pickering.
CARRIED;
19. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
City of Brampton
To construct six pedestrian crossings of the Etobicoke
Creek and one crossing of the West Humber River as a
component of park .development in the City of Brampton
A staff communication was presented advising that an application has been
received from the City of Brampton Parks & Recreation Department for
permission to construct 6 pedestrian crossings on the Etobicoke Creek and
1 on the West Humber River.
B-349 -8-
Res. #443 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of the
City of Brampton Parks & Recreation Department, be received; and
THAT the application of the City of Brampton Parks & Recreation Department
for permission to construct:
(a) two crossings on Lot 14, Concession 1, E.H.S.. Etobicoke Creek Watershed
(b) one crossing on Lot 13, Concession 1, E.H.S., Etobicoke Creek Watershed
(c) one crossing on Lot 9, Concession 1, E.H.S., Etobicoke Creek Watershed
(d) one crossing on Lot 4, Concession 3, E.H .S. , Etobicoke Creek Watershed
(e) one crossing on Lot 3, Concession 1, W.H.S. , Etobicoke Creek Watershed
( f) one crossing on Lot 16, Concession 10, N.D. , Humber River Watershed
be approved, subject to:
(A) All work being done in accordance with Drawings 1 to 8, Project
No. M2680.~ dated September 1979, as prepared by Triton Engineering
Services;
(B) All disturbed areas being restored to the satisfaction of The
Metropolitan Toronto and Regio~ Conservation Authority. CARRIED;
20. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Top,view Investments
To relocate a small tributary of the Rouge River on
Part of Lot 1, Plan 2196, Town of Markham
A staff communication was presented advising that a request has been
received from Topview Investments for permission to relocate the small water-
course on the above site to flow closer to the southern and eastern
boundaries of the property.
Res. #444 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Topview Investments, be received; and
THAT the application of Topview Investments for permission to relocate a
watercourse on Lot 1, Plan 2196, Town of Markham (Rouge River watershed) , be
approved, subj ect to:
(a) All work being completed to the satisfaction of the Town of Markham
and of the Authority;
(b) Rip rap being placed on the outside of stream bends as indicated on
the si te plan forming part of this permit;
(c) Every effort being made to minimize silting of the creek during
construction.
CARRIED;
21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ari J. Investments Limited
To construct a storm sewer outfall on a tributary of
the Don River, Town of Richmond Hill
A staff communication was presented advising that an application has been
received from Ari J. Investments Limited for permission to construct a storm
sewer outfall at the above location.
Res. #445 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Ari
J. Investments Limited, be received; and
THAT the application of Ari J. Investments Limited for permission to
construct a storm sewer outfall on Lot 37, Concession 1, Town of Richmond
Hill (Don River watershed) , be approved, subject to:
-9- B-350
(a) All work being carried out in accordance with Drawings Nos.l, 2, 3 and
8, Project No.8193-02, dated July 1979, as prepared by M.M. Dillon Ltd.;
(b) All disturbed areas being restored to the satisfaction of The
Metropolitan Toronto and Region Conservation Authority.
CARRIED;
22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
D. Miklas & Associates Limited
To construct a storm sewer outfall on Part of Lot 21,
Concession 4, Town of Markham (Rouge River Watershed)
A staff communication was presented advising that an application has been
received from D. Miklas & Associates Limited, on behalf of Paradelle
Developments, for permission to construct a storm sewer outfall draining
into a branch of the Rouge River at the above location.
Res. 1446 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
D. Miklas & Associates Limited, on behalf of Paradelle Developments, be
received; and
THAT the application of D. Miklas & Associates Limited on behalf of paradelle
Developments, for permission to construct a storm sewer outfall on Part of
Lot 21, Concession 4, Town of Markham (Rouge River watershed), be approved,
subject to:
(a) All work being completed in accordance with Project #Y-MI027, Drawing
No.13, as prepared and revised by D. Miklas & Associates Limited, which
forms part of the permit;
(b) Every effort being made to avoid the siltation of the watercourse
during construction of the outfall.
CARRIED;
23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Woodbine Downs Limited
To install a storm sewer outfall into the Humber River,
south side of Finch Avenue and west side of Humber
College Boulevard, Borough of Etobicoke (Humber River
Watershed)
A staff communication was presented advising that an application has been
received from Woodbine Downs Limited for permission to install a storm sewer
outfall into the Humber River at the above location.
Res. 11447 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Woodbine Downs Limited, be received; and
THAT the application of Woodbine Downs Limited for permission to install a
storm sewer outfall into the Humber River on Lot 34, Concession IV, Borough
of Etobicoke (Humber River watershed), be approved, subject to:
(a) All work being carried out in accordance with the engineering drawings
Nos. MB-6669 and PDB-1449, as prepared by Urban Engineering Consultants,
prepared for the Borough of Etobicoke;
(b) All work being completed in accordance with Borough Engineering standards;
( c) Every effort being made to minimize silting of the river during
con struction.
24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 CARRIED;
City of Brampton
To construct a storm sewer outfall on the Etobicoke Creek
A staff communication was presented advising that an application has been
received from the City of Brampton for permission to construct a 24" storm
sewer outfall from a proposed commercial and recreation centre site.
B-351 -10-
Res. #448 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of the
City of Brampton, be received; and
THAT the application of the City of Brampton for permission to construct a
storm sewer outfall on Lots 9 and 10, Concession 4E, City of Brampton
(Etobicoke Creek watershed), be approved, subject to:
(a) All work being carried out in accordance with Drawing #7850-A-l, as
prepared by Paul Theil Associates Limited and dated September, 1979;
(b) Gabion baskets being preceded by a filter mat or a 6"-12" layer of
crushed stone or gravel;
(c) Every effort being made to minimize erosion and siltation of the
creek during construction.
CARRIED 1
25. WATERFRONT PROJECT 1977-1981
-Property: Guildwood (West) Limited
Res. #449 Moved by: Mrs. S. Martin
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Report (October 15, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED 1
"Re: Project: Waterfront Project 1977-1981
Scarborough Sector
Authority: Executive Resolution No.460, Meeting No.23 -
January 21, 1976 and Authority Resolution
No.46, Meeting #3 - April 9, 1976
Subject Property: South of Sylvan Road
Owner: Guildwood (West) Limited
Area to be acquired: 4.900 acres, more or less
Recommended purchase price: $10,000.00, plus Vendors' legal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Water Lot in front of Lot 16, Concession "C",
Borough of Scarborough, The Municipality of Metropolitan Toronto, located
south of Sylvan Road, east of Markham Road.
"Negotiations have been conducted with officials of Guildwood (West) Limited,
and their solicitor, Mr. E.J. Pivnick, of the legal firm Pivnick & Morrow,
111 Richmond Street West, Toronto, M5H 2G4, and, subject to the approval of
your Committee, agreement has been reached with respect to a purchase price,
as follows:
The purchase price is to be $10,000.00, plus vendors' legal costs,
with date of completing the transaction to be as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing for land transfer tax, legal costs and
disbursements are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"Funds are available.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate."
26. FIRST BOLTON SCOUT HUT, VILLAGE OF BOLTON
TOWN OF CALEDON
A staff communication was presented advising that the Bolton Youth Group
(Incorporated), in conjunction with the Town of Caledon, proposes to
construct a replacement building at a new location in the Ted Houston Park
on the western edge of Bolton, the original building having been destroyed
by fire on October 31, 1978.
-11- B-352
Res. #450 Moved by: E.V. Kolb
Seconded by: J.S. Scott
RESOLVED THAT: Upon satisfactory completion of the demolition and site
restoration work at the fire site of the First Bolton Scout Hut by the Town
of Caledon, the Authority transfer the sum of $5,250.00, representing the
proceeds from the Authority's fire insurance coverage, to the Town of Caledon,
to be used for construction of a replacement building in the Ted Houston
Park on the western edge of Bolton.
CARRIED;
27. WATERFRONT PROJECT 1977-1981
-Property: The Toronto Harbour Commissioners and
The Corporation of the City of Toronto
Res. #451 Moved by: Mrs. S. Martin
Seconded by: C.F. Kline
RESOLVED THAT: The Report (October 17, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purChase.
CARRIED;
"Re: Project: Waterfront Project 1977-1981
Ashbridge's Bay Sector
Authority: Executive Resolution #460, Meeting #23 -
January 21, 1976 and Authority Resolution
146, Meeting #3 - April 9, 1976
Subject Property: South side of Lakeshore Boulevard East
OWner: The Toronto Harbour Commissioners and
The Corporation of the City of Toronto
Area to be acquired: 61.152 acres, more or less
Recommended Purchase Price: Nominal consideration of $2.00, plus
vendors' legal costs
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being all of Lots 124 to 138 inclusive and Parts of
Block "K" and Road and Part of the "Reserve for Park Development", Registered
Plan 520E and Part of the marshlands in Lake Ontario patented to the City of
Toronto in 1880 - City of Toronto, The Municipality of Metropolitan Toronto,
located on the south side of Lakeshore Boulevard East, west of Woodbine
Avenue.
"Negotiations have been conducted with officials of the Toronto Harbour
Commissioners and the Corporation of the City of Toronto and, subject to the
approval of your committee, agreement has been reached with respect to a
purchase price, as follows:
The purChase price is to be the nominal consideration of $2.00,
plus vendors' legal costs, with date of completing the trans-
action to be as soon as possible.
HI recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"Funds are available.
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate."
28. WATERFRONT PROJECT 1977-1981
-Working Agreement with the Toronto
Harbour Commissioners
A staff report was presented advising that the Toronto Harbour Commissioners
carry out landfi11ing operations for the Authority under the terms of the
WC1rking Agreement which was executed in 1972. The Harbour Commissioners are
"questing an increase in the overhead charge from 15% to 20% and an increase
:1 machine rates by an average of 17%.
}~es . '452 Moved by: Dr. T.H. Leith
Seconded by: Mrs. F. Ge11
RESOLVED THAT: The report on the Working Agreement with the Toronto Harbour
B-353 -12-
Commissioners be received; and
THAT the Works Division overhead charge be increased from 15% to 20%, and
that increases in the plant rates, averaging 17%, be approved;
AND FURTHER THAT the approval of the Ministry of Natural Resources be
requested.
CARRIED;
29. PROJECT W.C.-6l - DUFFIN CREEK CHANNEL IMPROVEMENTS,
TOWN OF \oJHITCHURCH-STOUFFVILLE
-Extra Work Order #l
A staff communication was presented advising that the following Change Order
has been received from Kilborn Limited to the contract for the above project:
Change Order #1
To remove and relocate existing 8" dia. sanitary sewer on Market Street
between Main Street and Somerville Street (including supply and
installation of approximately 65-70 metres of new 8- dia. clay pipe,
stone bedding and granular backfill, 1200 MM manhole and benching) .
Res. #453 Moved by: Mrs. F. Gell
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Extra Work Order #1 to the contract for Project W.C.-61 -
Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville - in the
amount of $11,000.00, be approved.
CARRIED;
30. WATERFRONT PROJECT 1977-1981:
ETOBICOKE SECTOR, HUMBER BAY WEST PHASE II
-Consulting Services
A staff report was presented advising that a proposal has been received from
Johnson Sustronk Weinstein & Associates Limited for consulting services to
completion of the above project at an estimated cost of $75,000.00.
Res. #454 Moved by: Mrs. S. Martin
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff report on consulting services for Humber Bay West
Phase II, Waterfront Project 1977-1981, be received; and
THAT the firm of Johnson Sustronk Weinstein & Associates Limited be retained
to complete the design and construction supervision required for the
remainder of the project, at an estimated upset fee of $75,000.00;
AND FURTHER THAT the approval of the Province of Ontario be requested.
CARRIED 1
3l. BLACK CREEK PIONEER VILLAGE
-Quotation: Portables - Tar & Gravel Roofs
A staff communication was presented advising that the following prices have
been received for replacing the tar and gravel roofs on the two portables
which have been moved into the Village:
W. Jansen $2,600.00
Bob McLaughlin $2,680.00
Pea tson $3,294.00
Res. #455 Moved by: Mrs. F. Gell
Seconded by: J.S. Scott
RESOLVED THAT: The firm 0 f W. Jansen be engaged to replace the roofs on the
two portables at Black Creek pioneer Village at a cost of $2,600.00.
CARRIED;
-13- 8-354
32. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation #79-46: Road Improvements
A staff communication was presented advising that the following quotations
have been received for the supply and delivery of road gravel, Granular "A"
and Granular "B" for improvements to the existing road at Lake St. George,
and for the road to the Stage II dormitory:
Granular "A" Granular "B"
Gormley Sand & Gravel @ $3,40 per ton @ $2.00 per ton
Lee Sand & Gravel Limited @ $3.20 per ton @ $2.20 per ton
Superior Sand & Gravel @ $4.70 per ton @ $3.45 per ton
It is estimated that approximately 1,100 tons of Granular nA" and 1,400 tons
of Granular nB" will be used.
Res. #456 Moved by: Mrs. L, Hancey
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The quotation of Gormley Sand & Gravel for the supply and
delivery of road gravel to the Lake St. George Conservation Field Centre, at
$3.40 per ton of Granular "A" and $2.00 per ton of Granular "B" be accepted;
it being the lowest quotation received.
CARRI ED;
33. WATERFRONT PROJECT 1977-1981
SCARBOROUGH SECTOR
-East Point Park: Consulting Services,
Master Plan Review & Site Plan Preparation
A staff communication was presented advising that at Meeting '1/78, the
Executive Committee adopted a recommendation to retain the firm Hough
Stansbury & Michalski Limited to review the existing Master Plan for East
Point Park and to prepare site plans for implementation. The estimated fee
was $69,000.00. The consultants have requested an additional amount of
$11,000.00 to offset the higher-than-expected costs of some parts of the
study and to complete the report and plans to the satisfaction of the
Authori ty.
Res. #457 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff report on Consulting Services for East Point Park
be received; and
THAT the request of Hough Stansbury & Michalski Limited for an additional
fee of $11,000.00 to complete the Master Plan review and site plan
preparation be approved;
AND FURTHER THAT approval of the Ministry of Natural Resources be requested.
CARRIED;
NEW BUSINESS
34. PROGRESS REPORTS ON ACTIVITIES OF THE
METROPOLITAN TORONTO AND REGION
CONSERVATION AUTHORITY
-Presentation to Member Municipalities
Res. *458 Moved by: Mrs. L. Hancey
Seconded by: Dr, T.H. Leith
RESOLVED THAT: The staff be requested to prepare progress reports on
activities of The Metropolitan Toronto and Region Conservation Authority for
presentation to member municipalities by January, 1980.
CARRIED;
35. STORMWATER MANAGEMENT CONFERENCE,
MINISTRY OF HEALTH BUILDING, TORONTO:
NOVEMBER 15, 1979
-Attendance at
Res. 1459 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
B-355 -14-
RESOLVED THAT: Mrs. J .A. Gardner be authorized to attend the Conference on Storm-
water Management to be held November 15, 1979 at the Ministry of Health
Building, Toronto; and
THAT her expenses in connection therewith, in the amount of $20.00, be paid.
CARRIED;
36. ORGANIZATIONAL REVIEW, PHASE I,
THE METROPOLITAN TORONTO & REGION
CONSERVATION AUTHORITY
-Final Report
MR. SCOTT advised that the above-noted report has been received and that a
meeting would be convened on Friday, November 9, 1979, commencing at 10:00
a.m. at the Authority office to consider the report.
37. THE METROPOLITAN TORONTO & REGION
CONSERVATION FOUNDATION
-Appointment of Secretary-Treasurer -&-
Assistant Secretary-Treasurer
The committee was advised that Mr. W.E. Jones had been appointed Secretary-
Treasurer and Mrs. C.A. Hayden Assistant Secretary-Treasurer of The
Metropolitan Toronto and Region Conservation Foundation, effective October
18, 1979.
38. "CONSERVATION BY THE PEOPLE": PRESENTATION
OF FUNDS FROM SALE OF
-Miss Catherine Richardson
The Chairman introduced Miss Catherine Richardson, stating that he had known
Dr. Arthur Herbert Richardson and his family for many years. Proceeds from
Dr. Richardson's book "Conservation by the People" have been donated, in the
past, for various Authority projects. The balance of cash from sales of her
father's book is now being designated by Cathy for deposit to the Black
Creek Growth Endowment Fund.
Mrs. Gell expressed appreciation on behalf of the Foundation, and Miss
Richardson presented the cheque, in the amount of $1,071.95, to Mr.
Henderson.
Mr. Higgs advised the members that he had had a very strong relation~hip with
Dr. Richardson during his years as Chairman of the Authority, and received a
great deal of advice from him in his early days with the Humber Valley
Conservation Authority. All who knew him as the first Chairman of The
Metropolitan Toronto and Region Conservation Authority had the deepest
admiration for Herbert Richardson.
As a token of the Authority's appreciation, the Chairman presented Miss
Richardson with a set of 4 framed colour prints, depicting scenes of pioneer
life at the Village.
Miss Richardson thanked the members, stating that possibly one of the great-
est loves of her father's life had been the Village, of which he was Honorary
Reeve for one year. On later occasions in her father's life, she had taken
his place at Village functions, and felt she had grown up with everybody.
The pictures will be much appreciated in her new home.
The Chairman advised that Miss Richardson had also presented the Authority
with Dr. Richardson's reports and other memorabilia which are presently
stored at the Kortright Centre for Conservation. Included is a rosewood
gavel presented to Dr. Richardson in his first year as Chairman of the
Authori ty. It is intended to have the gavel mounted in the Humber Room at
the Authority office. The collection of Herbert Richardson memorabilia will
be put on display at the Kortright Centre.
39. ADJOURNMENT
On Motion, the Meeting adjourned at 12:30 p.m., October 24.
R.G. Henderson K.G. Higgs
Chairman Secretary-Treasurer
1 9 7 9 BUD GET REV I S ION S PAGE: 23-
PROGRAM: Water and Related Land Management - Community Relations (Development) W.10 DATE: October 24. 1979
o RIG I N A L BUD GET REV I SED BUDGET
Sourccs of Financing Sources of Financing
~et Provincial Municipal Net Provincial ~Iun i c i pal
.ACTIVITY Expenditures Grant Lcvy Othcr Expenditures Grant Lcv)' Other
Kortright 292,472 41,800 34,200 216,472 - - - -
Albion Hills C.F.C. 7,000 - - 7,000 - - - -
Lake St. George - Phase I 171,722 - - 171,722 - - - -
- Phase II - - - - 89,000 - - 89,000
(I)
0
=
~
8
t"a:I
~I
w
.\11
)tCl"l
.
8-357
SCHEDULE "8"
STAFF PROGRESS REPORT
Property Division
During the period July~, 1979, to September 30, 1979, the
Property Division completed the acquisition of 9 new properties
containing 58.809 acres. One new property was expropriated during
the period. The total acreage of lands owned by the Authority, as
of September 30, 1979, is 26,595.279 acres.
The Property Division also carried out all of the routine admini-
stration management required in connection with Authority-owned lands,
i,e, agreement, easements, taxes, leases, rentals, insurance, etc.
A breakdown of the properties and acreages acquired by the
Authority to date is as follows:
FLOOD CONTROL AND WATER CONSERVATION
ETOBICOKE CREEK WATERSHED
2 - Properties settled during period containing 34.632 acres
- 2 purchases
Total to date--64 properties acquired containing 442.406 acres;
- 2 expropriations outstanding
MIMICO CREEK WATERSHED
Total to date--23 properties acquired containing 75.475 acres;
HUMBER RIVER WATERSHED
2 - Properties settled during period containing 18.187 acres
- 2 purchases
1 - Property sale during period
Total to date--727 properties acquired containing 8,376.304 acres;
- 1 expropriation outstanding
DON RIVER WATERSHED
2 - Properties settled during period containing 4.762 acres
- 2 purchases
1 - Property expropriated during period containing 2.201 acres
Total to date--160 properties acquired containing 1,793.004 acres;
- 4 expropriations outstanding
HIGHLAND CREEK WATERSHED
1 - Property sale
Total to date--139 properties acquired containing 820.708 acres;
ROUGE RIVER VALLEY WATERSHED
1 - Property settled during period containing .950 acres
- 1 purchase
Total to date--110 properties acquired containing 2,074.636 acres;
DUFFIN'S CREEK WATERSHED
2 - Properties settled during period containing 0.278 acres
- 2 purchases
Total to date--79 properties acquired containing 886.147 acres;
CONSERVATION AREAS
- Albion Hills Conservation Area
Total in Area--34 properties containing 1,044.142 acres;
B-358
- 2 -
- Black Creek Conservation Area
Total in Area--7 properties containing 113.966 acres;
- Bolton Community Conservation Area
Total in Area--4 properties containing 18.043 acres;
- Boyd Conservation Area
Total in Area--12 properties containing 991.090 acres;
- Bruce's Mill Conservation Area
Total in Area--2 properties containing 267.038 acres;
- Cedar Mill Property
Total in Area--l property containing 0.337 acres;
- Claireville Conservation Area
Total in Area--l property containing 28.114 acres;
- Claremont Conservation Area
Total in Area--5 properties containing 396.750 acres;
- Cold Creek Conservation Area
Total in Area--6 properties containing 467.880 acres;
- Frenchman's Bay Conservation Area
Total in Area--9 properties containing 49.430 acres;
- Glassco Park
Total in Area--l property containing 482.000 acres;
- Glen Haffy Conservation Area
Total in Area--ll properties containing 802.206 acres;
- Greenwood Conservation Area
Total in Area--l4 properties contai~ing 680.648 acres;
- Heart Lake Conservation Area
Total in Area--8 properties containing 380.663 acres;
- Humber Trails Conservation Area
Total in Area--l property containing 48.664 acres;
- Oakbank Community Pond
Total in Area--l property containing 9.350 acres;
- Petticoat Creek Conservation Area
Total in Area--l property containing 177.918 acres;
- Lake St. George Conservation Area
Total in Area--l property containing 319.250 acres;
- Tam O'Shanter Conservation Area
1 - Property sale during period
Total in Area--l property containing 118.571 acres;
B-359
- 3 -
FOREST AND WILDLIFE AREAS
- Gibson Lake Forest and Wildlife Area
Total in Area--l property containing 137.160 acres;
- Glen Major Forest and Wildlife Area
Total in Area--lO properties containing 1,442.057 acres;
- Goodwood Forest and Wildlife Area
Total in Area--6 properties containing 307.639 acres;
- King Creek Forest and Wildlife Area
Total in Area--l property containing 0.185 acres;
- Palgrave Forest and Wildlife Area
Total in Area--7 properties containing 628.432 acres;
- Peter Wright Forest and Wildlife Area
Total in Area--l property containing 20.939 acres;
AGREEMENT FOREST LANDS
- Uxbridge Forest and Wildlife Area
Total in Area--l property containing 93.000 acres;
- Humber Forest Area.
Total in Area--22 properties containing 1,803.165 acres;
NIAGARA ESCARPMENT LANDS
Total in Area--4 properties containing 251.926 acres;
WATERFRONT PLAN
- Project W.F.-l - Etobicoke Sector
Total to date--6 properties acquired containing 68,616 acres;
- Project W.F.-2 - Ashbridge's Bay Sector
Total to date--l property acquired containing 29.618 acres;
- Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete)
Total to date--4 properties acquired containing 0.641 acres;
- Project W.F.-3A - Pickering/Ajax Sector (Ext. No. 1)
Total to date--149 properties acquired containing 491.013 acres;
- Project W.F.-4 - Scarborough Sector
Total to date--52 properties acquired containing 456.148 acres
- 1 expropriation outstanding
B-360
- 4 -
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
July 1 to Sept. 30, 1979 - 9 properties settled containing 58.809
acres;
- (9 purchases)
- 1 property expropriated
- 2 property sales
Total to date--1,302 properties acquired containing 14,468.680 acres;
- 7 expropriations outstanding;
CONSERVATION AREAS
July 1 to Sept. 30, 1979 - 1 property sale during period
Total to date--120 properties acquired containing 6,396,060 acres;
FOREST AND WILDLIFE AREAS
July 1 to Sept. 30, 1979 -
Total to date--26 properties acquired containi~g 2,536.412 acres;
AGREEMENT FOREST LANDS
July 1 to Sept. 30, 1979 -
Total to date--23 properties acquired containing 1,896.165 acres;
NIAGARA ESCARPMENT LANDS
July 1 to Sept. 30, 1979 -
Total to date--4 properties acquired containing 251.926 acres;
WATERFRONT PLAN
July 1 to Sept. 30, 1979 -
Total to date--212 properties acquired containing 1,046.036 acres;
- 1 expropriation outstanding;
GRAND TOTAL OF ALL PROJECTS
July 1 to Sept. 30, 1979 - 9 properties settled containing 58.809 acres:
- (9 purchases)
- 1 property expropriated during period;
- 3 property sales
Total to date--l,687 properties acquired containing 26,595.279 acres;
- 8 expropriations outstanding.
B-361
To: The Chairman and Members of the Executive Committee, M.T.R.C.A.
Meeting #16/79
From: Mr. R. K. Cooper, Administrator, Historical Sites Division
Re: Historical Sites Division Staff Progress Report
July 1 to September 30, 1979
(1 ) PROGRAM
(a) Registration and Artifacts
From July 1st to September 30th, Black Creek received 22 donations
comprising 192 items. Notable among the recent acquisitions are an
1858 candlewick bedspread, an iron pot and griddle, three early Ontario
chairs and a lady's pocket pistol.
From late May to August 25th the Registration Department was assisted
by three students from Experience '79 Program 0705 through the Ministry
of Culture and Recreation. With their assistance the cataloguing has
been brought completely up to date, including the typing of classific-
ation and location cards. All registration records up to the middle
of 1979 have been microfilmed.
The refitting of the Mackenzie Home basement has been completed and the
textile collection has been moved to this location. Reorganization and
inventory of other storage areas continue.
(b) Publicity and Promotion
Through the summer, Black Creek staff have organized several special
displays promoting the Village. A six week display at Eaton's Yorkdale
through August and September involved four display cases, two period
room settings and picture display panels promoting Village acitivites
year round. Displays involving broom-making demonstrations were also
set up at Eaton's Centre and Eaton's Warehouse for Canada Day Celebrat-
ions, and the Science Centre for its 10th birthday celebration.
Black Creek also assisted Gibson House in North York, Century Village
in Lang, the Milton Agricultural Museum, the Grange in Toronto, and
Bolton Cider Tyme with loans of artifacts for special displays. Also
staff and oxen participated in Doon Village Festival.
At the C.N.E. this year Black Creek held a "What Is It?- competition in
the Arts, Crafts and Hobbies Building, and the 1837 fire pumper was
displayed at the Royal Insurance of Canada exhibit.
Once again, Black Creek has been used as a location for commercial
photography. C.F.T.O. "Kids' Korner" filmed some footage on candle mak-
ing at Black Creek and also interviewed the candle-maker at the studio.
Eaton's Yorkdale photographed several fashion layouts for use in their
"Canada Month" campaign. Regal Toys used the Laskay Emporium as back-
ground for a Christmas ad. Two cigarette companies and Pioneer Chain
Saws photographed their products at Black Creek for newspaper or
magazine ads. Ontario Hydro filmed early power sources for an educat-
ional film on nuclear power. Imperial Oil used the site for pictures
for their internal magazine; the cover of "Gallery", a new magazine for
homemakers' was shot in Laskay Emporium and segments for a filmstrip
on furniture making were shot at the Village Cabinet Maker's.
Village staff have spoken to several groups including the Bolton Rotary,
members of the Victorian Society of America, Southern Ontario Unit of
the Herb Society of America, volunteers of Grange, Art Gallery of Ontario,
Midland Historical Society and students of Seneca Historical Natural
Interpretive Service Course.
C.F.R.B. "Good News" interviewed Village staff for six programs on Black
Creek and early crafts. Staff were also interviewed on C.K.Q.T. Oshawa
for Gordon Grayson's Travel Show. Two programs on horses in pioneer
times were recorded with James West. These programs will be heard on
more than two dozen stations in Canada and the United States. Mr.
Bradshaw continues to be very good in assisting the Village, and staff
was interviewed on four different occasions during this period.
B-362
- 2 -
(c) Special Events
Over the summer there were 29 weddings held in the Village and the
Half Way House has hosted 31 receptions and banquets.
Sunday evening, September 9th, the Village hosted a very successful
outdoor Hymn Sing in the Valley, led by BishOp Read, Suffragan Bishop
of Toronto, with participation by several Anglican Church choirs and
the Etobicoke Temple Salvation Army Band. Over 500 people attended.
The 23rd Annual Pioneer Festival was held on Saturday, September 15th.
Over 7500 people attended and Village revenue from sales outlets showed
substantial increases over 1978.
The International Congress of Biochemists and Shoppers Drug Mart both
held evening conventions at Black Creek, with attendance totalling
over 4700.
Late this summer the Medicine Wagon was put back in operation on week-
ends, with a medicine show which included both magic tricks and the
sale of "Black Creek Elixir".
(d) Building Maintenance and Construction
The Mennonite Meeting House Drive Shed, which came from Milton, was
reconstructed by Village staff in time for use on Festival Day; there-
by eliminating the need for renting two tents.
The two portables in the lower parking lot have been completely
repainted and the skirting has been completed around both buildings.
Also the lumber storage building has been repainted.
(e) Ground Maintenance and Development
Repair and maintenance work has continued through the summer on all
boardwalks and fences. A regular maintenance program has been carried
out on the Peacock Woodlot.
(f) Livestock
A new calf was born in July and the Clydesdale mare produced the first
purebred colt to be born at the Village, bringing the number of Village
horses to eleven.
(g) Staff
One Village staff member has begun the second year of the Master
Spinners' Course. Several members of staff attended a lecture on early
Ontario furniture makers at Todmorden Mills arranged by the Metro
Museums Committee.
(2) FINANCIAL STATEMENT - January 1 to September 30, 1979
Total Budget Used
Operations Appropriation Budget Variance %
Expenditures $ 738,031 $ 889,000 $ 150,969 83
Revenue $ 648,588 $ 750,000 $ 101,412 86
Development
Expenditures $ 20,374 $ 70,917 $ 50,543 28
(3) FINANCIAL COMMENTS
(a) Operations and Maintenance
Black Creek Pioneer Village
As of September 30, 1979, total attendance at the Village was 221,040
as compared to 223,061 on the same date in 1978. Gate revenue is
down approximately $5,000.00; however, sales outlets have shown a sub-
stantial increase from $221,023.56 in 1978 to $263,062.93 in 1979.
Village citizenships now number 423, including 27 life members.
B-363
- 3 -
The Dickson Hill School Program is fully booked for the fall season,
and there is still a two year waiting list of teachers interested in
participating.
The government-sponsored Experience '79 program, which was completed in
August, provided 19 students to assist in Village operations, 3 students
in registration and 3 students on research. Research on the Sawyer's
House, cheese-making and brewing in the 19th century was carried out.
One student on a 16-week O.C.A.P. grant is presently assisting in the
Costume Department. Several men from the House of Concord work on a
daily basis at Black Creek and have provided extra labour for Village
maintenance and in the production of toys. Also Mimico continues to
provide manpower on week-ends.
(b) Historical Sites Development
The only building development underway at the present is the Sawyer's
House. Work is progressing on the restoration of furnishings for this
project and hydro is being installed, so that work on the completion
of this building can begin immediately. The first instalment of funds
from the Junior League has been received and the agreement with the
League has been signed.
B-364
CONSERVATION LAND ~ffiNAGE~mNT DIVISION
PROGRESS REPORT
JANUARY - SEPTEMBER, 1979
Conservation Services
Authority Land Management Programs
Forestry
This summer a plantation management study was undertaken for Glen Haffy
Conservation Area, Palarave Forest and Wildlifp. Arp.a and Gibson Lake.
Plantations were inventoried and management plans are being developed.
A program of woodlot and plantation management utilizing conservation
area staff was carried out during the winter and will be re-activated
this fall. Products from the management programs have been used for
firewood sales and saw logs (6,000 board feet). Forty-eight thousand
reforestation trees were planted on Authority lands, the majority at
Gibson Lake and Glen Haffy Conservation Area. Boy Scout groups from
York Region planted 20,000 trees at Claireville. This Fall, approximately
9,000 trees and shrubs will be planted at Glen Haffy, Claireville, Gibson
Lake and Boyd Conservation Areas.
Stream Improvement
Stream improvement projects were carried out at the Kortright Centre for
Conservation and the Humber Trails Conservation Area. Under the Special
Stream Enhancement Project, stream improvement works have been carried
out on Dutfin Creek in tne Claremont Conservation Area and the Greenwood
Conservation Area.
!-and Management
To date, six applications for agricultural rental of Authority lands ha~e
been assessed. Three assesments for Authority land acquisition were also
carried out. This summer, biophysical inventories of Authority lands were
carried out at Claireville, Greenwood and Boyd Conservation Areas. Under
the Junior Conservationist Award Program, operated by the Conservation
Authorities Branch of the Ministry of Natural Resources, students carried
out a management inventory of the High Hills property located in the
Glen Major Area. Inventories are used in preparing resource management
plans for Authority lands.
Private Land Management Programs
Forestry
Appriximately 5,959 deciduous trees and 12,994 shrubs have been planted
on private lands. Under the Private Land Reforestation Program 146,000
trees were planted utilizing Conservation Area Staff. A total of 30 site
visits have been made for the forestry program. Six tree spade rentals
were carried out on private lands and & tree spade applications are on file.
Stream Improvement
Four stream improvement projects have been carried out this summer on
private lands and stream improvement works under the Special Stream En-
hancement Program are presently underway. These include fencing and buffer
plantings along cold water streams. A stream assesment program was carried
out on the head waters of the Humber River. Five site visits have been
carried out for stream improvement.
Land Use Planninq
In June, a Conservation Services Field Day was held at palgrave Forest and
wildlife Area with approximately 32 people attending. Four Conservation
Plans have been completed and two remain on file. Twelve site visits have
been carried out for private landowners regarding pond construction and
aquatic weed control.
Plant Propogation 8-365
Expansion of the nursery operation has been undertaken this year and has
resulted in a 50% increase in production.
Special Projects
A landscape project was carried out at the Kortright Centre in preparation
for the opening of the Centre held in June. A tree and shrub maintenance
program was carried out this summer at the Humber Bay East Waterfront
Project. Plantings are presently being carried out at the Petticoat
Creek Conservation Area and are designed to rehabilitate those sections
of the area disturbed by the York-Durham sewer line. This project is
being funded by the Ministry of the Environment. Services staff will
also be carrying out plantings for the Peel-York-Durham revegetation
program and plantings on Metro Erosion sites. The rehabilitation of the
Thackeray Landfill Site is scheduled for mid-October. This is a five
year project funded by The Metropolitan Toronto Works Department,
Conservation Areas
Development
The combination of the late Provincial approval of the development budget
and the preparation of the Interim Conservation and Recreation Land Manage-
ment Plan have delayed development projects. However, with the end of
the summer season and the increased availability of operations staff all
proposed development work should proceed quickly during the fall months.
The fencing of a portion of the west boundary of the Heart Lake Conservation
Area was begun in September with a completion date set for the third week
of October.
Materials were acquired for the construction of 90 steel frame picnic
tables. All tables were constructed in the spring months and in use during
the summer season at the Petticoat Creek Conservation Area.
Footbridge construction initiated in September at the Greenwood Conservation
Area will be completed in October. One footbridge will provide access to
the day camp area replacing a temporary bridge while a second will provide
access to the nature trail.
The Albion Hills Campground Supervisor's Office/Residence is being constructed
by Authority staff and additional labourers hired as required. The founda-
tion work is scheduled for the third week of October and it is anticipated
the b~ilding will be completed by the end of November.
A contract has been awarded for the completion of the Bruce's Mill Foundation,
Materials are being supplied by the Authority.
Additional development work is being undertaken at the Cold Creek Ri fle
Range to extend the back stop and to recontour the range surface to reduce
the possibility of ricochets. Staff has worked closely with the Ontario
Provincial Police to ensure user safety. Materials for this work have
been approved and work will be completed during the Fall months.
The initial layout of the model airplane field, and new parking lot has
been finalized. In order to meet 1979 budget appropriations a pre-fabricated
structure is under consideration for the Cold Creek Trap Control Building.
The building will be erected by the end of November.
A number of plans have been developed during the summer months for proposed
works at the Claireville Area including landscape work at the beach
area and a landscape plan for the Cold Creek Trap Range Control Building.
These plans are required in 1900.
Visitor Survey
Throughout the summer months, the Visitor Survey has been carried out in
all conservation areas. Surveys were distributed randomly to approximately
15\ of all groups entering conservation areas excluding day camp and group
camps. Information on origin of visitors to the Indian Line Campground was
collected separately.
Students, during the summer months, distributed questionnaires and coded
........._ "..~~__,....C'!.oeo ~n,... "-'1"'\",1'"'\,1+-0,.. :::1I"~l '-Ie!.; c:
8-366
Over 7,000 of the 20,000 surveys were returned. This represents approximately
a 35% rate of return which is considered good for a handout survey of this
type.
Operations
During the winter, 8 conservation areas were open for winter activities
with most staff time being involved in routine operations. The Albion
Hills Ski Program operated at capacity while the Bruce's Mill Program ran
below capacity. This latter situation is expected to improve as this
program becomes better known. Questionnaires distributed to school and
other participating groups indicated a very high level of satisfaction
with the program facillties, content and ski staff. The improved ski
trails at Palgrave, Cold Creek and Claremont were well used. This past
ski season was shorter than previous years due to the lack of snow in
early January.
The preparation of the Conservation Areas for spring and summer activities
proceeded on schedule. The Maple Syrup demonstration at Bruce's Mill was
well attended with school groups and general public attendance up 900 and
2300 respectively over the 1978 program.
On May 13, 1979, an Open House was held at the Claireville Conservation Area
to launch the Authority's new canoe instruction and rental program. As
part of the Visitor Services program a promotional brochure and flyer were
circulated to schools, day camps, youth groups, and sports stores. Thirty-
two groups attended day instructional sessions. Three weekend courses and
two evening courses held were well attended by the general public. To date
the weekend rental demand for the 16 canoes and 8 rowboats has been at or
near capacity. The strong response to this program by both the general
public, schools and organized groups resulted in a very successful summer
program.
There continued to be a very high demand for conservation area facilities
by organized group picnics with a total of 609 reservations booked to the
end of September. The excellent summer weather during late June and early
July resulted in successive Sunday closing of most major use areas and
maintained attendance at the record 1978 levels. During the summer, 24
Day Camp organizations made use of conservation area facilities for their
programs. Again this year the Experience Program played an important role
in helping maintain conservation areas. A total of 43 students were e~
ployed including 3 who conducted a visitor survey.
Conservation area swimming facilities were extremely busy throughout the
summer. The Petticoat Creek pool winterizing procedures were again suc-
cessful and the pool opened on time. However, it was necessary to close
the pool on a number of occasions during the summer due to mechanical
breakdowns in the plumbing and filtering equipment. Repairs are being
carried out this fall in co-operation with the Water Resource Division,
Waterfront Section. An upstream sewage treatment plant spill on the east
branch of the Humber resulted in the closing of the Boyd swimming area for
a period of approximately 2 weeks in early August. This seriously affected
the Boyd area attendance. Despite the excellent work performed by our
lifeguard staff, there was, unfortunately, a drowning fatality this summer
at the Claireville Conservation Area.
During the summer, Conservation Area staff, in co-operation with the Property
Division have completed property line fencing at Glen Major Forest and
Wildlife Area. Similar projects are underway at Nashville Reservoir and
Palgrave Area. In preparation for the winter season staff hiring has
commenced along with minor alterations to ski trails.
Attendance at the Indian Line Campground has been excellent with the camp-
ground at or near capacity particularly during August. To date a total of
28 Special Passes distributed at the C.N.E. have been redeemed at Conser-
vation Areas. To September 30, 1979, conservation area attendance decreased
69,553 or 6% for the same period in 1978. This is a result of a lack of
snow during the early part of the winter and somewhat cool early Spring
weather. Summer attendance is slightly ahead of 1978. The following
table compares individual area attendance figures with the same period in
1978.
Conservation Area Attendance to September 30, 1979 B-367
1979 197'8
Albion Hills 152,871 181,514
Boyd 152,414 182,242
Bruce's Mill 181,652 192,753
Claireville 100,764 92,807
Claremont 25,603 29,646
Cold Creek 29,626 35,828
Glen Haffy 57,474 50,852
Greenwood 55,552 50,403
Heart Lake 111,440 128,277
Humber Trails 4,173 3,740
Palgrave 5,898 --
Woodbridge 10,986 14,728
Petticoat Creek 98,707 92,017
Indian Line 48,960 42,866
1,036,120 1,105,673
Financial Statement - January - September 1979
Yr. to !:ate Total %Budget Forecast to
Expend Comni t Approx. Budget Used Lee. 31/79
Q:ns. Areas
revelop. 129 , 476 12,112 141,588 270,000 52 270,000
Cals. Areas
cperat. 1,131,800 15,050 1,146,850 1,370,800 83 1,380,000
lent &
utili ty Serv. 29,644 - 29,644 39 , 000 76 39 ,000
Private Land
Program 122,559 1,920 124,479 113,000 110 113,000
Authori ty Land
Program 48,392 - 48,392 95,000 51 95,000
Cons. Area
R::!venIE 697,643 - 697,643 710,000 98 739,000
Private Land
~venIE 13,510 - 13,510 15,000 90 15,000
Financial Comments
Private Land Programs presently indicate an over expenditure. Prior to year
end, revenues forthcoming to the Plant Propogation Program will bring
expenditures within Budget allocations. Authority Land Programs currently
in progress will use alloted funds. Conservation Areas Development projects
will be completed by year end with spending within budget allocations.
Conservation Areas Operations budget is anticipated to be slightly overspent
by year end. However, Conservation Areas Revenue will be over estimate
resulting in a surplus in the Conservation Areas Program. Items previously
deleted from the budget due to funding limitations will be proceeded with
to the limit of excess funds.
79.10.17.
11p
B-368
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMI~~EE, MTRCA, Mtg.116/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY l, 1979 TO SEPTEMBER 30, 1979
FLOOD CONTROL SECTION
(1 ) MAINTENANCE WATER CONTROL STRUCTURES
(a) PROGRESS
Normal day to day maintenance was carried out on all the water control
structures. The study of the Lower Humber Weirs and the fencing of
the Brampton Diversion Channel have been completed.
The major maintenance at the Goodwood Pumping Station involving clean
out of the drainage canal and construction of a proper access road is
in progress and should be completed by the end of October, 1979.
(b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979
Year , of Forecast
To Date Total Budget to
Expend . Conmi. t:Iren ts Approp. Budget Used Dee:. 31/79
$ $ $ $ '0 $
Maintenance 103,009.43 121,00 103,130.43 184,000,00 56 184,000.00
(c) FINANCIAL COMMENT
The maintenance programme is on target and it is expected to expend this
total budget this year.
(2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS
(a) PROGRESS
There has been no change in this item since the last progress report
except for the staff salaries and travel items,
(b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp, Budget Used Dec. 31/79
$ $ $ $ , $
Te1emark 4,163.64 0 4,163.64 8,000.00 52 8,000.00
Gauges
Radio 15,766.20 0 15,766.20 15,000.00 105 16,000.00
System
Staff 50,777,40 0 50,777.40 65,800.00 77 65,800.00
Salaries
Staff 1,096.06 0 1,096.06 3,700.00 29 3,700.00
Travel
71,803.30 0 71,803.30 92,5'"0.00 78 93,500.00
/2., .
B-369
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg,116/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 2
(2) (c) FINANCIAL COMMENT
Except for the small over-expenditure on the radio system, the remaining
items are on target.
(3) INTERIM PROJECT CAPITAL
(a) PROGRESS
The Flood Plain Acquisition Programme continued during this period and
as well completed the acquisition programme within the Village of
Stouffville for the proposed channel works.
The various studies on the Flood Control Plan Review are continuing and
it is expected that the Damage Center Analysis and the final plotting
of the floodline on the Humber River will be completed by the end of
October.
(b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979
Year Forecast
To Date Total , of to
Expend . Ccmni tnents Approp. Bu:1get Bu:1get Dec. 31/79
$ $ $ $ Used $
a
Flood Plain 1,075,389.80 261,827.00 1,327,344.00 667,273.00 199 1,400,000.00
Aoquisition
Headwater 147,275.59 0 147,275.59 200,000.00 73 200,000.00
Aoquisition
Damage Center 19, 519 . 55 0 19,519.55 75,000,00 26 75,000.00
Analysis
EnvironIrental 35,868.05 0 35,868.05 100,000.00 35 100,000.00
f.bU toring
Flood Control 183,675.30 0 183,675.30 297,000.00 61 297,000.00
Plan Review
Milne Dam 9,872.82 493.0 10,365.82 20,450.00 50 11,000.00
\tbrkshop
1,471,601.11 262,320.00 1,724,048.31 1,359,723.00 127 2,083,000.00
(c) FINANCIAL COMMENT
Except for the acquisition budget, the remaining items are on target.
/3. . ,
8-370
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.116/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 3
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS
Erosion Control and Slope Stabilization in Metro:
ITEM LOCATION WATERSHED STATUS
Major Remedial Work 6-14 Sulkara Court Don River completed
Revegetation
in the fall
19-45 Riverview Heights Humber River Completed
50-58 Stanwood Crescent Humber River Completed
Enfield/Sunset/Jellicoe Ave. Etobicoke Completed
Creek
10 Code co Court (Phase I) Don River In Progress
Sweeney Drive Slope Don River In Progress
Modification
35 Canyon Avenue Don River In Progress
Minor Remedial Work Beechgrove Rd.-Phase II Highland Completed
Creek
34 Restwell Crescent Don River Completed
Revegetation
in the fall
Deanewood Crescent Vicinity Mimico Creek Completed
Together with the foregoing, spring revegetation was carried out at
8 sites and maintenance work was carried out at 4 sites, Also
preventative work was carried out at 31-35 Rivercove Drive and
8-14 Bruce Farm Drive as an interim measure, until permanent works can
be carried out in 1980.
/4. . .
8-371
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg..16/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 4
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS (Cont I d)
Erosion Control and Slope Stabilization in the Regions of Peel, York
and Durham
REGION LOCATION WATERSHED STATUS
Peel 138 King Street Vicinity Humber River Completed
Bolton
York 14th Avenue - Phase I Rouge River Completed
Lots 5 & 6 Cone.8, Markham
York 19th Avenue Rouge River Completed
Lot 30, Cone.8, Markham
York 7374 Kipling Avenue, Woodbridge Humber River Completed
York 7440 Kipling Avenue, Woodbridge Humber River Completed
York 8254 Pine Valley Drive Vicinity Humber River In Progress
Woodbridge
Durham 558 Pine Ridge Road Vicinity Rouge River Completed
Pickering
Durham Elizabeth Street, Ajax Duffin Creek Completed
Reconstruction of Highland Creek
1979 was the third year of the three-year programme for remedial work
within the Highland Creek. Work has been completed at the following
sites. It is expected that all of the sites damaged by the storms in
1976 and 1977 will be repaired as contemplated under this project by
the end of 1979.
LOCATION STATUS
Morningside Parks Yard Completed
Scarborough College - Tennis Courts Completed
South of Kingston Road Bridge Completed
/5. . .
B-372
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.'16/79
FROM: Mr. M. R. Garrett, Administrator, Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 5
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS (Cont I d)
Engineering Studies:
STOUFFVILLE CHANNEL:
The contract has been awarded and approximately 30% of the works is
completed.
OAK RIDGES STUDY:
The final report has been received for this study and a brief has been
prepared for approval by the Authority and the Province of Ontario.
(b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979
Year % of Forecast
To rate Total 8Ixiget to
ExpeOO . Camri. tITents Afprop. 8lx1get Used Dee. 31/79
$ $ $ $ % $
W.C.-58 99,690.00 0 99,690.00 99,690.00 100 99,690.00
Erosion 398,621.77 38,658.00 437,279.77 800,000.00 54 800,000.00
Cattrol
Metro
Erosion 58,385.20 1,083.00 59,468.20 200,000.00 29 200,000.00
Control
Peel,York
& Durham
Highla.OO 159,103.20 0 159,103.20 240,000,00 66 240,000.00
Creek
Restoration
Stouffville 54,507.30 9,000.00 63,507.30 395,000.00 16 550,000.00
Channel
Wilket 0 0 0 10,000.00 0 10,000.00
Creek
Oak Ridges 7,142.32 0 7,142.32 5,000.00 142 7,500.00
777,449.79 48,741.00 826,190.79 1,749,690.00 47 1,907,190.00
(c) FINAOCIAL cx::M-tENI'
All of the items will be on target except for the Stouffville Channel
construction which will be over-expensed due to the decision to carry
out all of the works in 1979.
1979.10.16
JCM/fn
8-373
TO: THE CHAIro~N AND MEMBERS OF THE EXECUTIVE COMMITTEE,
M.T.R.C.A. - Meeting #16/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 6
The Authority is particularly concerned that additional funds be allocated
for shoreline management and therefore, requested the support of the member
municipalities in seeking supplementary funding from the Ministry of Natural
Resources. Strong support has been received from Metro Toronto, the City of
Toronto, Scarborough and Etobicoke. A meeting was held with the Minister,
Mr. Auld and Mr. Godfrey to discuss this matter. Hopefully, the Supplementary
Project funding will be available in 1980 and 1981.
COLONEL SAMUEL BOIS SMITH PARK
The response from the Hinister of the Environment concerning the application by
the Authority for the approval of the Colonel Samuel Bois Smith master plan
under the Environmental Assessment Act was recently received. It' is the
recommendation of the Minister that:
n (a) The environmental assessment be accepted: and
(b) The undertaking as proposed be refused approval
to proceed according to the provisions of
section 14 of the Act."
The Minister has also recommended that a Hearing be held before the Environmental
Assessment Board.
HUMBER BAY WEST
The total area created as part of the Humber Bay West project is now 64 acres,
The Master Plan shape has been achieved.
The Humber Bay Boating Federation is having a very successful season.
Approximately 460 boats are now moored at the site and the waiting list is
growing rapidly. It is anticipated that the Federation will easily reach the
design capacity of Humber Bay by next season and should be able to undertake
the construction of some of the associated land based facilities.
Discussions have been held with the Federation to finalize development priorities
for 1980. The Preliminary Budget Estimates provide for interior shoreline
stabilization, servicing and completion of grading. Design of these elements is
underway and a final decision on the actual development program will be made
pending the final budget allocation to be determined early in 1980.
HUMBER BAY EAST
A contract was awarded to M. A. Butt in the amount of $780,722.70 at Executive
Committee Meeting #8/79 on June 13, 1979 for the construction of the park
buildings, foot bridges and other site development features. Construction is
nearing 50% completion and should be finished on schedule.
The landscaping plans have also been prepared, but funds will not permit this
work to be =ompleted in 1979. Final landscaping will be undertaken by the
Conservation Land Management Division in the spring of 1980. The Authority
staff is presently involved in the maintenance of existing plant material and
grassed areas.
The major development objectives in 1980 will be the completion of landscaping
and the paving of the entrance road and parking areas.
An Authority crew has substantially completed the liner of the pond system as
well as piping for the pond water supply.
B-374
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
<.. M.T.R.C.A. - Meeting #16/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 7
WESTERN BEACHES
The Authority's involvement in this area is virtually complete pending a decision
on additional funding for the waterfront development program.
The Sunnyside Pavilion is continuing to deteriorate and since the Authority is
unable to undertake the restoration of the building, the City of Toronto plans to
refurbish the structure.
BLUFFERS, PHASE II
Fill volumes have increased in the last two months resulting in good progress
being made towards the completion of the breakwater. Filling is presently
concentrated along the breakwater between points 8 and 9.
Federal funding of the project under the Small Craft Harbours Assistance Program
is continuing. Armouring of Point 9 is complete. Stone has been purchased and
stockpiled for armouring of Point 8 in 1980.
The Bluffers Boating Federation has successfully installed approximately 110
mooring slips. Landfil1ing over the winter months will concentrate on completion
of sufficient land base to allow for construction of approximately 140 slips in
1980.
Discussions have been held with the Boating Federation to finalize development
priorities for 1980. The preliminary budget estimates provide for interior
shoreline stabilization, servicing and completion of the landfilling.
The construction of the new launching ramps and day mooring docks is complete.
The construction of the permanent parking lot associated with the day mooring
docks, as well as the extension of the parking area associated with Phase I is
also complete with line painting and landscaping around the lots to be finalized
in the near future.
Installation of permanent underground hydro service is scheduled to start
November 5, 1979 with completion by December 1, 1979.
EAST POINT
Discussions are ongoing with the Authority's consultant, Hough Stansbury &
Michalski Ltd. in an effort to finalize the Master Plan review and to prepare
site plans in preparation for the construction to begin at this site upon
completion of Bluffers Park.
The Easterly Filtration Plant, presently under construction by Metro Toronto, is
nearing completion and Authority staff is working closely with representatives of
Metro Works Department to take the maximum advantage of the construction
activities ongoing in the area. Considerable volumes of fill and top soil which
were surplus from the ~letro Works site are available to the Authority for use in
the construction of East Point Park. Since the East Point lands were used for
storage of fill, materials, etc. during the construction of the Water Plant, the
contractors are required to carry out certain works on Authority lands which will
assist in the development of the park at no cost.
ENVIRONMENTAL MONITORING
The collection of field data on water quality, sediment quality, benthos and fish
populations is nearing completion and extensive examination of bottom conditions
in the area of East Point Park (by scuba diving) has been carried out by Authority
staff and consultants. The work is being done as part of the Master Plan review,
B-375
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
M.T.R.C.A. - Meeting #16/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 8
Environmental Monitoring (Continued)
The Ministries of the Environment and Natural Resources continue to raise concerns
about the landfilling process. A technical committee has been recently
established with representatives of the two Ministries and the Authority to
review the impact of landfilling. Data collected in previous waterfront
monitoring programs is extremely valuable in tlrisprocess. The final report is to
be prepared by December.
\
I
SHORELINE MANAGEMENT
Preparation of a detailed Master Plan in the Scarborough sector is ongoing.
Provincial approval has been received to retain a consult:ant to examine certain
soil mechanics and slope stability questions along the Scarborough Bluffs, aimed
at producing recommendations on appropriate construction techniques to stabilize
the Bluff face after the toe of the Bluffs has been protected.
I
Construction of an offshore revetment has been completed ~t Crescentwood Park.
The work was done to protect the toe of the fill material.placed by the Borough
of Scarborough last fall to save portions of CrescentwoodiRoad and underground
services which were threatened. The work was carried out;by rented machines
under the supervision of Authority staff.
The next priority is the KingSbury-Harding area which was partially protected by
a program of filling by the Borough of Scarborough over the summer. Although
protection of the toe of the newly formed slope is required, staff feel that
substantial settlement and slides are inevitable in this area and therefore it is
not safe to work in that area at present.
Therefore work will now be undertaken at the Eastern Beaches to stabilize the
shoreline and provide for re-construction of the boardwalk. This work will be
underway by November 1, 1979.
txI
I
PlQ: 9 IN
-.J
FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 0-
Year to Date % of Budget Estimated Total
Site Expenditures Commitments Total Approp. Budget Used Expend at Dec.31
Colonel Sam Smith 6,008.81 0 6,008.81 50,000.00 12 50,000.00
Humber Bay West 109,396.34 0 109,396.34 160,000.00 68 160,000.00
Humber Bay East 176,036.31 690,497.00 866,533.31 950,000.00 91 950,000.00
Western Beaches - - - 5,000.00 - 5,000.00
Ashbridge's Bay 6,409.65 500.00 6,909.65 5,000.00 138 8,000.00
Bluffers Park 400,069.09 174,167.00 574,236.00 740,000.00 77 760,000.00
East Point Park 9,448.31 - 9,448.31 20,000.00 47 28,000.00
Petticoat Creek 5,344.16 - 5,344.16 20,000.00 26 20,000.00
Studies & Monitoring 27,452.15 512.00 27,964.15 60,000.00 46 65,000.00
Salaries 41,310.35 - 41,310.35 50,000.00 82 50,000.00
Shoreline Management 84,155.94 - 84,155.94 500,000.00 16 304,000.00
Land Acquisition 339,848.97 700.00 340,548.97 240,000.00 141 400,000.00
PROGRAM TOTALS 1,205,480.08 866,3'76.00 2,071,856.08 2,800,000.00 73 2,800,000.00
===============================================================================================
Financial Comments: The Waterfront Development Budget is generally on target with some minor reallocations among activities
being required. The major difference between the budget and the projected year end expenditures is in
shoreline management. This decrepancy is due to several factors. The acquisition of an endangered
house was charged to land acquisition rather than shoreline management. In addition, the work at
Crescentwood Road was completed for approximately 20% less than budget. There was an allocation for
maintenance dredging at Mimico Creek which could not be carried out because of environmental
considerations and the filling operation at Kingsbury made it unsafe to proceed with the planned toe
protection in that area.
1979.10.17
BED/md
The Chairman and Members of the Executive Committee, M.T.R.C.A. B-377
TO:
Meeting #16/79 - October 24, 1979
FROM: T. E. Barber, Administrator, Information & Education Division
RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT --
January 1 - September 30, 1979
(a) INFORMATION
The Authority's information work is carried out under the Community and
Staff Relations Program, which is comprised of four components, namely
Administration, Conservation and Recreation Land Management Plan, Water
and Related Land Management Plan, and The Metropolitan Toronto and Region
Conservation Foundation.
Highlights Included:
_ the production of 397,425 pieces of literature including:
_ 200,000 copies of the four-colour general brochure;
_ 138,000 copies of the four-colour Black Creek pioneer
Village brochure;
_ 10,000 copies of the 1979 Calendar of Events and Activities;
_ 2,000 copies of the 1977-78 Biennial Report;
_ 1,000 copies of the Meeting Facilities Brochure for the
Kortright Centre for Conservation;
_ 500 copies of the 1979 Directory;
- 5,000 copies of the four-colour brochure for The Metropolitan
Toronto and Region Conservation Foundation;
_ 225 copies of the sixty-six-page catalogue for Foundation
fund-raising;
- 10,000 stick-on name tags;
- 30,000 flyers and 700 posters produced and distributed for
the 23rd Annual Pioneer Festival at Black Creek Pioneer
Village;
_ the distribution of 145,000 Authority brochures and 110,000 Black
Creek Pioneer Village brochures;
_ the completion of six special printing projects (26,200) for the
Albion Hills Conservation Field Centre, the Kortright Centre for
Conservation, the Soil Conservation Society of America, Kortright
Sunday outings, Claireville Canoeing, and "Cabal" activities;
_ the Authority is participating in Superguide (300,000) plus 300,000
copies of the Attractions with the Convention & Tourist Bureau of
Metropolitan Toronto. Distribution is continuing;
- news and photo releases, reflecting the Authority's and Foundation's
activities, have been written and distributed to media and School
Boards (total distributed - 40,200);
_ samples of 1,425 press clippings, on all aspects of the Authority's
activities, have been received;
_ eight special photo and four special news releases were written for
the Kortright Centre Official Opening (limited distribution) ;
_ one hundred and thirty-seven colour television promos (one-minute) ,
on the Spring, Summer and Fall related activities of the Authority,
have been distributed and are in use;
_ one Authority exhibit was set-up and on display for Canada Heritage
Week in the Scarborough Town Centre and another was set-up for the
Claireville Dam Tour. As well, exhibit materials were supplied to
Black Creek Pioneer Village staff for two displays;
_ the production. and distribution of 1,500 copies of two issues of
"Highlights" and 600 copies of one issue of "Inside";
_ twenty-one special photo assignments have been completed during this
period;
...
Ef- j 111
TO: Executive Committee, M.T.R.C.A.#16/79 - October 24, 1979
RE: Information and Education Division - Progress Report
January 1 - September 30, 1979 Page 2
- three new one-minute colour public service films are now in progress
(one for the Kortright Centre for Conservation, one for Flood Control
and Water Conservation~ and one for The Metropolitan Toronto and Region
Conservation Foundation);
- various features continue to be sent to the media regarding the
activities at the Kortright Centre for Conservation;
- staff organized two Town Hall Meetings which were held at the
Kortright Centre for Conservation on September 11th and 12th;
- there are now new postage meter identification stamps, relating to
Authority activities (e.g. Alert Your Ch~ldren of the Dangers of
Spring Flooding; Black Creek Pioneer Village - open March 19 to
December 30, 1979; Season's Greetings; Write for a Free Colour
Brochure; Follow this Sign to the Conservation Areas; Managing
Your Renewable Natural Resources);
- invitations and programs were printed and arrangements were carried
out for Arbor Day, ~~y 8th. One hundred and fifty people attended;
- Authority presentations were made to the Oakville Kawanis Club,
the Woodbridge Vaughan Rotary Club, Thornhill, and the Shriners'
Club, Caledon;
- two special press previews were planned and carried out at the
Kortright Centre for Conservation on June 11th and 12th, to introduce
the Centre for the members of the media;
- staff arranged for the Official Opening of the Kortright Centre by The
Honourable Robert Welch, Q.C., provincial Secretary for Justice and
Deputy Premier of the Province of Ontario, on June 21st;
- arrangements were made and invitations sent out for the Bill Davidson's
Day Garden Party at Black Creek Pioneer Village, which was held on July
5th. Service recognition awards were presented as follows: Lifetime
Passes to M. W. H. Biggar, Emil Kolb and Gordon Norton; and Gold
Medallions to W. C. Davidson, Q.C., Case Bontje, Eileen Wigg and Frank
McKechnie. Approximately 130 people attended;
- a waterfront tour was arranged and carried out on July 9th for new
Federal Members of Parliament;
- Authority's participation at the Canadian National Exhibition, in
"Metroshow", went well. Staff designed and built the exhibit and
based the program on the theme of the 25th Anniversary of Hurricane
Hazel and the resource management activities of the Authority since;
- distribution of Authority brochures and Valley Regulations has been
completed to all municipal offices and many government agencies in the
watershed;
- staff looked after invitations and R,S.V.P.'s for the Annual Sugaring
Off Day, held at Bruce's Mill Conservation Area, on April 7th;
- staff attends regular meetings of the Attractions Council of the
Convention & Tourist Bureau of Metropolitan Toronto;
- staff participated in a committee established to promote the Kleinburg
and Town of Vaughan areas. It is expected that a program will get
underway in the new year;
- the first meeting of the Hurricane Hazel 25th Anniversary Planning
Committee was held on September 17th and it was recommended that a
Seminar be held on Wednesday, October 3rd in the Council Chambers,
Toronto City Hall.
. . . 3
8-:"379
TO: Executive Comm1ttee, M.T.R.C.A. #16/79 - October 24, 1979
RE: Information and Education Division - Progress Report
January 1 - September 30, 1979 Page 3
(b) EDUCATION
(i) Residential Field Centres
- operating at about capacity;
- accommodating the usual range of elementary and secondary
level students and other community groups, such as girl guides
and church groups; and specialized groups such as the Faculty
of Forestry, University of Toronto, and a group from the
University of Guelph studying land resource management;
- the summer courses were very well attended. 64 students
participated in the Archaeology credit course for senior
secondary students at Boyd, the March of Dimes summer camp
at Claremont provided a rewarding experience for 50 campers
and 30 staff and there were 20 students who successfully
completed the York University course in Conservation and
Environmental Education (Geography 255) at Albion;
- students from the Practice Teaching Programs at the
Faculty of Educations of both the university of Toronto and
Althouse College are going to participate in the Field Centres'
Programs; as well, York University Faculty of Education has
expressed an interest in having their students involved in the
Field Centres' Programs.
(ii) Lake St. George Conservation Field Centre
Phase I of Lake St. George has been re-scheduled to begin October
29, 1979. All classes previously booked between September 4 and
October 26, 1979 have been re-scheduled at a later date, either
at Lake St. George or at Albion and Claremont.
(iii) Kortright Centre for Conservation
- of the five theme reports, three have now been completed,
Fish and Wildlife, Forestry and Water. The Land Technical Review
Committee will be meeting on October 25, 1979 at the Kortright
Centre for Conservation, and the Energy Technical Review Committee
will meet later this year.
- the development of the outside area includes:
- 80% completion of trails;
- the wildlife pond to be completed by October 12;
- the plans for the entrance are complete, with the first
phase to be implemented within the next month;
- the signage on Highway #400 and Major MacKenzie Drive is now
in place.
(iv) Black Creek Pioneer Village
- a high interest by teachers and students and the continuation of
the Practice Teaching Program for the Faculty of Education
students from the University of Toronto;
- the hosting of a number of teacher professional development days:
- the Christmas program is completely booked.
(c) FINANCIAL COMMENTS
A. Operations and Maintenance - Community Relations
Information and Education Operations
All projects are meeting budget commitments, except the Lake St. George
Conservation Field Centre and the Kortright Centre for Conservation.
The delay of two months in the opening of the Lake St. George Conservation
Field Centre has resulted in an estimated deficit of $6,000 which will be
carried forward to 1980 Operations as per the agreement between the
School Boards and the Authority.
. . . 4
B-380
TO: Executive CommiLtp.~, ~LT.R.C.A. 116/79 - October 24, 1979
RE: Information and Education Division - Progress Report
January 1 - September 30, 1979 Page 4
Staff chanqes and lowcr-than-anticipated revenues have resulted in a
projected deficit at the Kortright Centre, which will result in an overall
deficit of $9,187 in the Information and Education Operations. The staff
s.s currently investigating ways and means of reducing costs and increasing
revenue for the remainder of the year, in order to reduce the forecasted
deficit .
B, Water and Related Land Management -
community Relations Program (lH 0 )
Expenditures under "Exhibits, Furnishings and Equipment - Kortright Centre"
are considerably under the 1979 budget. These expenditures are based on
cash-flow from the Foundation and not on annual budget allocation, and are
limited by the approved project allocation of $233,319.00
"Lake St. George Develop~ent" reflects nearly $40,000 of expenditures
chargeable to Stage II and will be incorporated into the Stage II approved
project cost of $189,000.
uConservation Information" and "Conservation Education" expenditures are
in line with budget estimates.
C. Conservation and Recreation Land Management -- Conservation Area
Information and Interpretive Program (C3)
Expenditures to the end of the year are forecasted to be in excess of
budget by $1,700 as a result of over-spending on the Official Opening of
the Kortright Centre for Conservation, the Garden Party and the Honour
Ro.ll Awards Program.
A, OPERATIONS AND MAINTENANCE - COMMUNITY RELATIONS
Information and Education
Expenditures Expenditures Expenditures Forecast to end
1979 Budget To-Date \ of Budget of 1979
$859,000 507,100 60\ 789,400
Revenue Revenue Revenue Forecast to end
1979 Budget To-Date \ of Budget of 1979
$757,700 439,900 56\ 663,800
B. WATER AND RELATED LAND MANAGE~1ENT - COMMUNITY RELATIONS PROGRAM (WI0)
1979 Expenditures Expenditures Forecast to
Budget To-Date \ of Budget end of 1979
Albion Hills $ 7,000 4,600 65\ 7,000
J(CFC - Area
Deve10~nt 76,000 55,800 73t 76,000
- Furnish.
Exh. ,D:)uipnt 216,472 86,700 40\ 115,323
ISG - Developrent 171,722 210,700 123\ 171,722
$471,194 357,800 76% $370,045
Cbns. Infonnation 85,500 66,000 77' 85,500
Cons. alucation 153,500 122,800 80~ 153,500
$239,000 188,800 7~% 239,000
c. CONSERVATION AND RECREATION LAND MANAGF.MENT --
CONSERVATION AREA INFOR~~TION AND INTERPReTIVE PROGRAM CC3)
1979 Expenditures Expenditures Forecast to end
Budqet To-Date , of Budget of 1979
S21.nnn 2n.,nn CHit. 22.700
B-381
TO: The Chairman and Members of the Executive Committee, M.T.R.C.A,
Meeting #16/79 - Wednesday, October 24, 1979
FR: Guy Dudar - Administrator, Finance Division
RE: STAFF PROGRESS REPORT - FINANCE DIVISION - #3/79
JANUARY 1, 1979 TO SEPTEUBER 30, 1979
ADMINISTRATION
Financial Review
Expenditures: 74% of the total budget has now been expended. At
December 31. 1979 it is estimated that the budget will be overspent
by approximately S3,OOO or .2%.
Revenues: Only 56% of the total budget of $70,000 has been earned.
At the present rate, it would appear that at December 31, 1979 there
will be a short fall of $22,000.
Net Expenditures: It is estimated that the Administration budget will
be overspent by approximately $25,000 or 2%.
GENERAL OPERATIONS
Financial Review
Expenditures: As at December 31, 1979, it is estimated that the budget
of $112,000 will be underspent by $10,000 or 9$. This will be primarily
due to interest income of approximately ~12,OOO reduced by cost increases
in Office Maintenance expenditures.
Revenues: BUdgeted revenues of $16,500 should be exceeded by approximately
$10,000.
Net Expenditures: It is estimated that at December 31, 1979 the net
expenditure budget of $96,500 will be underspent by approximately $20,000
or 20%.
SUMMARY
Est. Position Surplus
Budget at Dec. 31/79 (Deficit )
$ $ $
Administration 1,277,000 1,302,000 (25,OOO)
General Operations 96,500 76,500 20,000
1,373,500 1,378,500 (5,000)
:wr
1979.10.23.
~ B-382
,
the metropolitan toronto and region conservation authority
minutes Report #17/79
EXECUTIVE COMMITTEE WEDNESDAY-NOVEMBER-14-1979 U 7/79
-- ------
The Executive Committee met at the Kortright Centre for Conservation on Wednesday,
November 14, 1979, commencing at 10:00 a.m.
In the absence of the Chairman, Mrs. F. Gell chaired the meeting.
PRESENT WERE
Vice Chairman Mrs. F. Gell
Members M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
Dr. T.H. Leith
Mrs. S. Martin
(For Mr. M.W.H. Biggar) F.R. Perkins
J.S. Scott
Authority Member Bal Vir Singh
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Executive Secretary Mrs. K. Conron
Research Planner, Planning & Policy Mrs. A.C. Deans
Head, Waterfront Section, WRD D.E. Denney
Development Co-ordinator, Planning & Policy J.W. l-ialetich
Head, Flood Control Section, WRD J.C. Mather
Senior Secretary, Planning & Policy Miss L. Trivelli
ABSENT WERE
Chairman R. Grant Henderson
Members M.W.H. Biggar
E.V. Kolb
MINUTES
The Minutes of Meeting #16/79 were presented.
Res. #460A Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: The Minutes of Meeting #16/79, as presented, be adopted as if
read.
CARRIED;
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS ITS ADOPTION:
1. REPORT #3/79 - FLOOD CONTROL & WATER
CONSERVATION ADVISORY BOARD
Mr. Scott presented Report #3/79 of the Flood Control and Water Conservation
Advisory Board.
Res. #460B Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H, Leith
B-383 -2-
RESOLVED THAT: Report #3/79 of the Flood Control and Water Conservation
Advisory Board be received and the brief "Channel Improvements on the East
Humber River at Oak Ridges in the Town of Richmond Hill" be appended as
Schedule "A" of these Minutes; and
THE EXECUTIVE COMMITTEE RECO~~ENDS THAT: The Recommendations (a) , (b) and
(c) , as set forth herein, be adopted:
(a) The works outlined in the brief: "Channel Improvements on the East
Humber River at Oak Ridges in the Town of Richmond Hill, dated
September, 1979, be approved;
(b) The Regional Municipality of York be requested to approve the work
proposed in the brief;
(c) The Regional Municipality of York be advised that, subject to the
approvals required for the Interim Water and Related Land Management
Project 1979-1981 being obtained, the Authority is prepared to
proceed with the channel improvements on the East Humber River at Oak
Ridges in the Town of Richmond Hill, as set out in the brief dated
September 1979, on the basis of funding provided for these works in
the Project.
CARRIED;
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORr~TION OF THE AUTHORITY THE
FOLLOWING ACTION TAKEN ON ITErffi ADOPTED BY THE EXECUTIVE COMMITTEE:
2. APPOINTMENT OF AUTHORITY MEMBER
-The Regional Municipality of Peel
A communication was presented advising that Mrs.H. Dianne Sutter has been
appointed to The Metropolitan Toronto and Region Conservation Authority to
replace Alderman K. Coutlee.
Res. #461 Moved by: C.F, Kline
Seconded by: F.R. Perkins
RESOLVED THAT: The communication received from Mr. L.E. Button, M.A.,
Regional Clerk, The Regional Municipality of Peel, regarding the appointment
of Councillor D. Sutter as a member of the Authority, effective October 25,
1979, be received; and
THAT Mrs. H. Dianne Sutter's name be added to the list of Authority members;
and further
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mrs. H. Dianne Sutter be appointed a
member of the Flood Control and Water Conservation Advisory Board and the
Etobicoke-Mimico Advisory Board effective October 25, 1979; and
THAT the Secretary-Treasurer be authorized to conduct a mail ballot of the
members of the Authority to confirm the recommendation of the Executive
Committee.
CARRIED;
3. THE METROPOLITAN TORONTO AND REGION
CONSERVATION FOUNDATION
-Appointment of New Member
A communication was presented regarding the appointment of Mr. J.O. Elliott
as a member of The Metropolitan Toronto and Region Conservation Foundation.
Res. #462 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
RESOL VED THAT: The following recommendation of the members of The Metropolitan
Toronto and Region Conservation Foundation -
"THAT Mr. J.O. Elliott, President of Custom Concrete Limited, be
invited to become a member of the Foundation."
-be received; and
----
-3- B-384
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr. J.O. Elliott, President of Custom
Concrete Limited, be appointed a member of The Metropolitan Toronto and
Region Conservation Foundation; and
THAT the Secretary-Treasurer be authorized to conduct a mail ballot of the
members of the Authority to confirm the recommendation of the Executive
Committee.
CARRIED;
4. 1979 CONSERVATION AUTHORITIES SENIOR TECHNICAL STAFF
CONFERLNCE, m:CEMBER 2-5, 1979, OSHAWA, ONTARIO
-Attendance at
A staff communication was presented advising that Authority staff members
have been asked to participate in the program for the above conference, at
which a number of items will be of interest to the technical staff.
Res. #463 Moved by: E.H. Card
Seconded by: C.F. Kline
RESOLVED THAT: Authority staff, as designated by the Secretary-Treasurer, be
authorized to attend all or parts of the 1979 Conservation Authorities Senior
Technical Staff Conference, Central Region, to be held in Oshawa, Ontario,
December 2-5, 1979; and
THAT their expenses in connection therewith, in the estimated amount of
$600.00, be paid.
CARRIED;
5. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation #79-46: Road Improvements
A staff communication was presented advising that at Executive Committee
Meeting #16/79, held October 24, 1979, the quotation of Gormley Sand and
Gravel, for the supply and delivery of road gravel to th~ Lake St. George
Conservation Field Centre, was accepted, it being the lowest quotation
received. Between the time of submission of quotation and placing of order,
Gormley Sand and Gravel increased its price to $3.50 a ton of granular "A"
and $2.20 a ton of granular "B". Based on the tonnage of'~ranular "A" and
granular "B" required, the lowest price would now be the pr;ice quoted by Lee
Sand & Gravel Limited. ':
Res. #464 Moved by: Dr. T.H. Leith
Seconded by: M.J. Breen
RESOLVED THAT: Resolution #456/79 (Executive Committee Meetipg #16/79, held
October 24, 1979) be rescinded; and
THAT the quotation of Lee Sand and Gravel Limited for the supply and delivery
of road gravel to the Lake St. George Conservation Field Centfe, at $3.20 a
ton of granular "A", and $2.20 a ton of granular "B", be accepted, it being
the lowest quotation received.
CARRIED;
6. ADMINISTRATION OF ONTARIO REGULATION 735/73
-July/August/September/October, 1979
The staff presented a report concerning the administration of Ontario
Regulation 735/73 for the period July/August/September/October, 1979.
Res. #465 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The report of the administration of Ontario Regulation 735/73
for the period July/August/September/October, 1979, as amended, be received
and appended as Schedule "B" of these Minutes.
CARRIED;
B-385 -4-
7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Itr. William Tkachuk
To add an existing gabion wall and to reshape rear yard
area on east bank of the r-timico Creek at #156 Humbervale
Boulevard, south of Bloor Street and east of Royal York
Road, Borough of Etobicoke
A staff communication was presented advising that an application has been
received from Mr. William Tkachuk for permission to add to an existing gab ion
wall and to reshape the rear yard at the above location.
Res. #466 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of Mr.
William Tkachuk, be received; and
THAT the application of Mr. William Tkachuk for permission to construct a
gab ion wall and to place fill at #156 Humbervale Boulevard, Borough of
Etobicoke (Mimico Creek watershed), be approved, subject to:
(a) All work being carried out in accordance with drawings prepared by
Erosion Control Gabions Limited and dated October 10, 1979;
(b) Every effort being made to minimize silting of the creek during
construction.
CARRIED;
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Barsyd Investments Limited
To regrade the lands at rear of John Duck I s Tavern and
the Universal Motel, #2063 Lakeshore Boulevard West,
Borough of Etobicoke (Humber River Watershed)
A staff communication was presented advising that an application has been
received from Barsyd Investments Limited to regrade the lands at the above
location.
Res. #467 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Barsyd Investments Limited, be received; and
THAT the application of Barsyd Investments Limited to regrade the lands at the
rear of John Duck's Tavern and the Universal Motor Hotel, located at #2063
Lakeshore Boulevard West, Borough of Etobicoke, be approved, subject to:
(a) No fill being placed in the lake;
(b) The Authority bei~g notified in advance of the proposed starting
date for construction.
CARRIED;
9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Heritage-Willow Limited
To construct storm and sanitary sewer outfalls, pedestrian
crossing and gabion protection along the Don River, Town
of Richmond Hill
A staff communication was presented advising that an application has been
received from Heritage-Willow Limited for permission to construct a sanitary
sewer outfall west of Kersey Drive and north of Weldrick Road in the Town of
Richmond Hill.
Res. #468 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Heritage-Willow Limited, be received; and
THAT the application of Heritage-Willow Limited for permission to construct a
storm and sanitary sewer outfall, a pedestrian crossing and gabion protection
on Lot 43, Concession 1 and Lot 51, Registered Plan 2027, Don River watershed,
be approved, subject to:
-5- 8-386
(a) All work being done in accordance with Drawings Nos.l, 2, 3, 4,
and 5, Project #E79.43, as prepared by Bryan Thomas & Associates
Inc. , and dated July, 1979;
(b) All gab ion works being preceded by a 6"-12" layer of crushed
stone or gravel or a filter mat;
(c) Every effort being made to minimize erosion and siltation along
the watercourse during construction;
(d) All disturbed areas being restored to the satisfaction of The
Metropolitan Toronto and Region Conservation Authority and of
the Town of Richmond Hill.
CARRIED 1
10. APPLICATION FOR PERllIT UNDER ONTARIO REGULATION 735/73
West Woodbridge Investments
To construct sanitary sewer and watermain crossing a
tributary of the Humber River, north-east corner of
Highways #7 a nd # 27 , Lots 6 & 7, Concession VIII,
Town of Vaughan
A staff communication was presented advising that an application has been
received from West Woodbridge Investments for permission to undertake con-
struction of a sanitary sewer and watermain crossing at the above location.
Res. #469 Moved by: ~1rs . L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of West
Woodbridge Investments, be received; and
THAT the application of West Woodbridge Investments for permission to under-
take construction of a sanitary sewer and watermain on Lots 6 and 7,
Concession VIII (Humber River watershed) , be approved, subject to:
(a) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(b) Every effort being made to minimize silting of the river during
construction.
CARRIED 1
11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Pickering
To construct storm sewer outfall into the Petticoat Creek
off Rosebank Road, Part Lot 30, Range 1, B.F.C. , Town of
Pickering
A staff communication was presented advising that an application has been
received from the Town of Pickering for permission to construct a storm sewer
outfall into the Petticoat Creek at the above location.
Res. #470 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED TH1\T: The staff communication, together with the application of the
Town of Pickering, be received; and
THAT the application of the Town of Pickering for permission to construct a
storm sewer outfall into the Petticoat Creek off Rosebank Road on Part of Lot
30, Range 1, Broken Front Concession, Town of Pickering, be approved, subject
to:
(a) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(b) Every effort being made to minimize the silting of the watercourse
during construction;
(c) All work being carried out in accordance with Drawing #8, Project
11419, as prepared by R. V.. Anderson Associates Limited and dated
April, 1979, which forms part of the permit.
CARRIED 1
B-387 -6-
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Hr.G.A. Gazarek
To erect addition to existing car dealership at #1800
Kingston Road, Part Lot 18, Concession 1, Town of
Pickering (Duffin Creek Watershed)
A staff communication was presented advising that an application has been
received from Mr. G.A. Gazarek of Sheridan Chevrolet-Oldsmobile for
permission to erect an addition on the north side of the existing automobile
dealership at the above location.
Res. j/471 Moved by: HI's. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of Mr.
G.A. Gazarek of Sheridan Chevrolet-Oldsmobile, be received; and
THAT the application of Mr. G.A. Gazarek for permission to erect an addition
to an existing car dealership at #1800 Kingston Road, also known as Part Lot
18, Concession 1, Town of Pickering (Duffin Creek watershed) , be approved,
subject to:
(a) The proposed addition having a finished floor elevation of 83 metres;
(b) All work being completed to the satisfaction of the Authority and of
the Town of Pickering.
CARRIED;
13. APPLICATION FOR PEm1IT UNDER ONTARIO REGULATION 735/73
Kingspoint Developments Limited
To construct a building and re-grade portion of property,
Part Lot 6, Concession I, E.H.S. , (Part Block 1, R.P.
A-21) , City of Brampton (Etobicoke Creek Watershed)
A staff communication was presented advising that an application has been
received from Kingspoint Developments Limited for permission to construct a
building and alter the existing contours at the above location.
Res. #472 Moved by: Mrs. S. Martin
Seconded by: J.S. Scott
RESOLVED THAT: A Hearing be scheduled for consideration of the application
of Kingspoint Developments Limited for a permit to construct a building and
alter the existing contours on Part Lot 6, Concession I, E.H.S. (Part Block
1, R.P. A-21) , City of Brampton (Etobicoke Creek watershed) .
CARRIED;
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Muriel Williams
To place 6" drainage pipe, 50 metres in length, at the
southerly limits of main golf course parking lot, Lot
10, Concession 5E., Town of Markham (Rouge River Watershed)
A staff communication was presented advising that an application has been
received from Muriel Williams for permission to add to the existing golf
course drainage system at the above location.
Res. #473 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Muriel williams, be received: and
THAT the application of Muriel williams for permission to place a 6"
drainage pipe and cover same with clean fill on Lot 10, Concession 5E.,
Town of Markham (Rouge River watershed) , be approved, subject to:
(a) All work being carried out in accordance with the drawings submitted:
(b) Every effort being made to minimize silting of the watercourse during
construction.
CARRIED;
-7- B-388
15. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Property: Douglas Meharg and Mario Vettese
Res. #474 Moved by: C.F. Kline
Seconded by: F.R. Perkins
RESOLVED THAT: The Report (October 25, 1979) set forth herein, received
from the Property Administrator, be adopted and that the Secretary-Treasurer
be authorized and directed to complete the purchase.
CARRIED;
"Re: Proj ect: Interim Water & Related Land Management
Project 1979-1981 - Flood Plain and Valley
Land Acquisition Component - Rouge River
Watershed
Authority: Executive Resolution No. 133, Meeting il4 -
April 12, 1978 and Authority Resolution
#51, Meeting #3 - April 21, 1978
Subject Property: West side of Highway #48, south of Highway
#7
Owners: Douglas Meharg and Mario Vettese
Area to be Acquired: 9.12 acres, more or less
Recommended Purchase Price: $2,500.00 per acre (Le. $22,789.00) ,
plus Vendors' legal costs.
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lot 10, Concession VII, Town of Markham,
The Regional Municipality of York located on the west side of Highway #48,
south of Highway #7.
"Negotiations have been conducted with the owners and their solicitor, Mr. J.
Lachlan Cattanach, Q.C., of the legal firm Cattanach, Hindson, Sutton & Hall,
52 Main Street North, Markham, Ontario, L3P lX5; and, subject to the approval
of your Committee, agreement has been reached with respect to a purchase
price, as follows:
The purchase price is to be the sum of $2,500.00 per acre (Le.,
$22,789.00) , plus Vendors' legal costs, with the transaction to
be completed by mid-1980.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
16. BOROUGH OF ETOBICOKE
-Request for Permanent Easement,
North of Rexdale Boulevard, West of Highway #27
A staff communication was presented advising that a request has been received
from the Borough of Etobicoke to provide a permanent easement for a storm
sewer required north of Rexdale Boulevard, west of Highway #27.
The proposed easement affects Authority-owned land known as Part of Lot 34,
Concession IV, Fronting the Humber, designated as Part 1 on Plan 64R-790l,
Borough of Etobicoke, The Municipality of Metropolitan Toronto.
Res. #475 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
RESOLVED THAT: A permanent easement be granted to the Borough of Etobicoke,
required for construction of a storm sewer, north of Rexdale Boulevard, west
of Highway #27. Said easement is shown as Part 1 on Plan 64R-7901. The
Authority-owned land affected is Part of Lot 34, Concession IV, Fronting the
Humber, Borough of Etobicoke, The Municipality of Metropolitan Toronto. Said
easement to be granted for the nominal consideration of $2.00, subject to the
Borough of Etobicoke being responsible for carrying out and paying all legal,
survey and other costs involved in the transaction; and
B-389 -8-
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
17. BOROUGH OF SCARBOROUGH
-Request for Permanent E~sement,
East of Midland Avenue, South of Undercliff Dr.
A staff communication was presented advising that a request has been received
from the Borough of Scarl~rough to provide a permanent easement for a storm
sewer and outlet to St. Augustine Dropshaft, east of Midland Avenue, south of
Undercliff Drive.
The proposed easement affects Authority-owned land known as Part of Lots 334,
335, 336, 337, 338, 354, 355, 356, 357, 358, 369, 370, 371, 372, 373, 379,
380 and Part of Block "A" , Registered Plan 1566, Borough of Scarborough, The
Municipality of Metropolitan Toronto.
Res. #476 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A permanent easement be granted to the Borough of Scarborough
required for construction of a storm sewer and outlet to St. Augustine Drop-
shaft, east of Midland Avenue, south of Undercliff Drive. Said easement is
shown as Parts 1, 2 and 3 on Plan 64R-7997. The Authority-owned land affetted
is Part of Lots 334, 335, 336, 337, 338, 354, 355, 356, 357, 358, 369, 370,
371, 372, 373, 379, 380 and Part of Block "A" I Registered Plan 1566, Borough
of Scarborough, The i'olunicipality of Metropolitan Toronto. Said easement to
be granted for the nominal consideration of $2.00, subject to the Borough of
Scarborough being responsible for carrying out and paying all legal, survey
and other costs involved in the transaction; and
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
18. CITY OF NORTH YORK
-Request for Permanent Easement,
South of Rowntree Mill Road, west of Islington Ave.
A staff communication was presented advising that a request has been received
from the City of North York for a storm sewer easement, south of Rowntree
Mill Road, west of Islington Avenue.
The proposed easement affects Authority-owned land known as Part of Lot 31,
Registered Plan 2388, designated as Parts 1 and 2 of Plan 64R-7955, City of
North York, The Municipality of Metropolitan Toronto.
Res. #477 Hoved by: J.S. Scott
Seconded by: Mrs. L. Hancey
RESOLVED THAT: A permanent easement be granted to the City of North York for
a storm sewer, south of Rowntree Mill Road, west of Islington Avenue. Said
easement is shown as Parts land 2 of Plan 64R-7955. The Authority-owned
land affected is Part of Lot 31, Registered Plan 2388, City of North York, The
Municipality of Metropolitan Toronto. Said easement to be granted for the
nominal consideration of $2.00, subject to the City of North York being
responsible for carrying out and paying all legal, survey and other costs
involved in the transaction; and
BE IT FURTHER RESOLVED THAT the appropriate Authority officials be authorized
and directed to sign the necessary documents to give effect thereto.
CARRIED;
19. BOROUGH OF SCARBOROUGH
-Request for Permanent Easements,
Military Trail west of Highcastle Road
A staff communication was presented advising that a request has been received
from the Borough of Scarborough to provide storm sewer and bridge maintenance
easements required in connection with the widening of Military Trail west of
Highcastle Road.
-9- B-390
The proposed easements affect Authority-owned land known as Parts of Lot 15,
Concession II, designated as Parts 3, 4, 7, 8, 11, 17, 18, 19, 20, 21, 22,
26, 27, 28 and 30 on Plan 64R-7987, Borough of Scarborough, The Municipality
of Metropolitan Toronto.
Res. #478 Moved by: Dr. T.H. Leith
Seconded by: E.H. Card
RESOLVED THAT: Permanent easements be granted to the Borough of Scarborough,
required for construction of a storm sewer and bridge maintenance on Military
Trail, west of Highcastle Road. Said easements are shown as Parts 3, 4, 7, 8,
11, 17, 18, 19, 20, 22, 26, 27, 28 and 30 on Plan 64R-7987. The Authority-
owned land affected is Parts of Lot 15, Concession II, Borough of Scarborough,
The Municipality of Metropolitan Toronto. Said easements are to be granted .
for the nomi.nal consideration of $2.00, subject to the Borough of Scarborough
being responsible for carrying out and paying all legal, survey and other
costs involved in the transaction; and
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
20. CITY OF BRAMPTON
-Request for Conveyance of Authority-owned land:
Gore Road
A staff communication was presented advising that a request has been received
from the City of Brampton for the conveyance of a small parcel of Authority-
owned land required to facilitate access from the Gore Road to the Hilltop
Gore Cemetery.
Res. #479 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A small parcel of Authority-owned land, containing 0.090
acres, more or less, be conveyed to the City of Brampton, to facilitate
access from the Gore Road to the Hilltop Gore Cemetery. Said land being Part
of Lot 4, Concession IX, N.D., City of Brampton,. designated as Part 3 of Plan
of Survey dated July 16, 1979, prepared by W.N. Wildman Limited.
Consideration to be the nominal sum of $2.00, plus all legal and other costs
involved in completing the transaction; and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20 (c) of The Conservation Authorities Act, R.S.O.
1970 Capter 78 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
21. BOROUGH OF SCARBOROUGH
-Request for Conveyance of Authority-owned Land:
Military Trail
A staff communication was presented advising that a request has been received
from the Borough of Scarborough for the conveyance of certain parcels of
Authority-owned land required for the widening of Military Trail west of
Highcastle Road.
Res. #480 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Certain parcels of Authority-owned land, containing a total
of 0.664 acres, more or less, be conveyed to the Borough of Scarborough for
the widening of Military Trail west of Highcastle Road. Said land being
Parts of Lot 15, Concession II, Bo~ugh of Scarborough, designated as Parts 2,
5, 6, 9, 10, 12, 13, 15, 23, 24, 25, 29 and 31, Plan 65R-7987. Consideration
to be the nominal sum of $2.00, plus all legal, survey and other costs
involved in completing the transaction; and
THAT said conveyance be subject to an Order-in-Council being issued in
accordance with Section 20 (c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78 as amended;
B-39l -10-
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documents.
CARRIED;
22. WATERFRONT PLh~ - ETOBICOKE SECTOR
COLONEL SAMUEL BOIS SMITH WATERFRONT AREA
-Environmental Assessment
A staff communication was presented advising that a preliminary review has
been made by staff of the Review of the Environmental Assessment of the above-
noted Waterfront Area. In his letter dated October 23, 1979, which
accompanied the document, the Minister of the Environment recommended that a
Hearing be held to resolve points of conflict and enable him to make a final
decision in this matter.
In order to properly prepare for the Hearing, considerable time is required
by the staff and its consultants.
Res. 11481 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
advise the Environmental Assessment Board that, due to other commitments, it
will not be in a position to attend upon the Environmental Assessment Hearing
Board regarding the Colonel Samuel Bois Smith Waterfront Area until after
April 1, 1980.
CARRIED;
23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
Erosion Control & Slope Stabilization in The Regional
Municipality of Peel
-Proposed Remedial Work: Rear of Nos.176-188 Mill Street,
City of Brampton (Etobicoke Creek Watershed)
A staff communication was presented advising that, as outlined in the staff
report entitled "Erosion Control and Bank. stabilization in the Regions of
Peel, York and Durham", which was approved by the Executive Committee at
Meeting 1115/78, remedial work is proposed at the rear of Nos. 176-188 Mill
Street, City of Brampton.
Res. #482 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Erosion control work be carried out at the rear of Nos. 176-
188 Mill Street, Etobicoke Creek watershed, City of Brampton, at an estimated
cost of $31,900.00; and
THAT the approval of the Ministry of Natural Resources be requested;
AND FURTHER THAT the benefiting property owners be required to contribute
$2,800.00 towards the cost of the work.
CARRIED;
24. HUMBER VALLEY ADVISORY BOARD
-Report of Meeting of Members:
Thursday, November 1, 1979
A report was presented advising that members of the Humber Valley Advisory
Board toured the Roughland Pasture Research and Administration Area at the
Elora Agricultural Research Station on Thursday, November 1, 1979. A short
meeting of the members present was held following the tour.
Res. #483 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Information and Education Advisory Board be requested to
consider the establishment of a Land Use Demonstration at the Kortright
Centre for Conservation to illustrate the application of the principles
established at the Elora Agricultural Research Station which could be applied
to the Headwaters area under the jurisdiction of The Metropolitan Toronto and
Region Conservation Authority.
CARRIED ;
-11- B-392
Res. #484 Moved by: Mrs. J.A. Gardner
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Professor J.E.E. Winch of the Department of Crop Science,
Ontario Agricultural College, University of Guelph, be appointed a member
of the Land Technical Review Committee - Kortright Centre for Conservation.
CARRIED:
NEW BUSINESS
25. MANAGEMENT STUDY REVIEW SUB-COMMITTEE
-Report of Meeting #5/79
Res. lI485 Moved by: J.S. Scott
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: Consideration of Report #5/79 of the Management Study Review
Sub-Committee be deferred to the next meeting of the Executive Committee
scheduled to be held December 5, 1979.
CARRIElJ;
26. KEATING CHANNEL
-Dredging
A staff communication was presented having regard to the proposal received
from the Toronto Harbour Commissioners (November 1, 1979) to continue
construction of the dredgeate endikement at the above location over the
winter months of 1979/1980.
Res. lI4 86 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
appropriation for the Keating Channel dredging in 1980 be increased to
$200,000.00, subject to the approval and increased funding allocation of The
Municipality of Metropolitan Toronto and the Province of Ontario.
CARRIED;
27. CANADIAN NATIONAL RAILWAY LINE,
BURLINGTON TO BARRIE
Res. 1I4 87 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOL VED THAT: The Halton Region, Credit Valley and The Nottawasaga Valley
Conservation Authorities, be requested to investigate, in conjunction with
The Metropolitan Toronto and Region Conservation Authority, the availability
of the Canadian National Railway right-of-way extending from Burlington to
Barrie, to determine the feasibility of said Authorities jointly acquiring
the right-Of-way from the Canadian National Railways for development of a
recreation trail.
CARRIED;
28. SCHEDULING OF MEETINGS
-Author i ty, Executive Committee, Functional
& Watershed Advisory Boards
MRS. GELL requested that future meetings of the full Authority, Executive
Committee and first meetings of the year only of the functional and watershed
advisory boards, be scheduled and printed in the Authority directory.
Subsequent meetings of the functional and watershed advisory boards to be as
required and at the call of the Chair.
29. ADJOURNMENT
On Motion, the Meeting adjourned at 12:00 a.m.
Mrs. F. Gell, Vice Chairman K.G. Higgs
Acting Chairman Secretary-Treasurer
B-393
SCHEDULE "A"
THE METROPOLITAN TORONTO AND REGION
CONSERVATION AUTHORITY
A BRIEF ON
.CHANNEL IMPROVEMENTS ON THE EAST HUMBER RIVER AT OAK RIDGES"
IN THE TOWN OF RICHMOND HILL
AS PROPOSED IN
THE INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT
1979-1981
SEPTEMBER, 1979
B-394
CONTENTS OF BRIEF
I. DETAILS
(a) Purpose
(b) Location and Description
(c) Property Acquisition
(d) Costs
(e) Financing
B-395
1. DETAILS
(a) Purpose
The purpose or these works is to enable the Metropolitan
Toronto and Region Conservation Authority to ~mplement channel
improvements on the East Branch of the Humber River at Oak Ridges
in the Town of R~chmond Hill.
Completion of this work will offer flood protection for
this commun~ty to the 1:100 yr. flood and el~minate a recurrent
flooding problem.
B-396
I. DETAILS
(b) Location and Description
The East Branch ot the Humber River flows through the area
known as Oak Ridges as shown on F1gure 1 and the work proposed will
involve that portion of the Humber River lying between Schomberg
Road and a p01nt approximately 600 meters upstream of Bathurst
Street as shown on Figure 2.
This area, originally located w1thin the Township of King,
became part of the Town of R1chmond Hill 1n the Regional Municipality
of York under regional government restructuring in 1971.
The Oak R1dges area nas been the source of concern for some
time due to recurrent flooding. The area is characterized by
poor drainage and this comb1ned with flat channel gradients, low
streambanks, and local channel constr1ctions are largely responsible
for the flooding condit1ons.
Rectificat10n of this problem was first studied in 1968 by
The Metropolitan Toronto and Region Conservation Authority. The
channel improvements proposed at that time were not carried out due
to budget limitations.
The flooding however has continued to be of concern to the
local res1dents and the Town of Richmond Hill and after several
minor attempts on behalf of the Authority to provide some relief
without much success, the Authority through discussions with the
Town of Richmond Hill agreed to review the situation.
Due to the long t1me lapse since the 1969 study and the
high cost of the recommended solution, the Authority felt that it
was necessary to re-evaluate the problem and to look at alternate
remedial measures. Therefore 1n 1978 a review of the flooding
problem in the Oax Ridges area was undertaken.
A review of the hydrology was undertaken first to verify
the design flows and to allow for the increased development in the
watershed and channel 1mprovements being carried out by the Town
of Richmond Hill upstream of the study area. Flows for the
1 in 5 yr, 25 yr, 100 yr floods as well as the Regional Storm were
generated and these were translated 1nto flood elevat10ns throughout
the study area.
0
8
... ~
.
>' It
.
~ OJ
..
Z
..
>! ., ..
.. .. ,.,
co RICHMOND HILL
OJ !
.I .,
OJ OJ
OJ ..
" ..
'"
Q
MAPLE
MAJOR MACKENZIE ORIVE
tV
CHANNEL IMPROVEMENTS
ON THE EAST HUMBER RIVER
AT OAK RIDGES
IN THE TOWN OF RICHMOND HILL
SEPrEMBER, 1979 FIGURE 1
8-398
I, DETAILS
(b) Location and Description (Cont'd)
Once the floodlines had been plotted, the extent of
flooding under each design floOd could be determined. ThJ.s then
enabled the computation of antJ.cipated flood damages associated
with the various return period floods. The costs ot the various
alternative solutJ.ons could then be compared to the anticipated
damages and the economJ.c feasJ.bility of each solution could be
determined.
From thJ.s analysis, it was shown that a total of 53
buildings would be flooded under the Regional Storm between Yonge
Street and Bathurst Street. The 1:100 yr, 1:25 yr, and 1:5 yr
floods affected a total of 27, 19 and 9 buildings respectively.
The damages associated with the flooding ranged from $210,000
for the Regional Storm to $91,000, ~38,000 and $19,000 for the
1:100 yr, 1:25 yr and 1:5 yr floods.
The recommended solution (Figure 2 ) chosen after carrying
out the cost benefit analysis provides protection to all structures
to the 1:100 yr flood and J.S comprised of channel J.mprovements
downstream of Parker Avenue, sJ.lt removal at Schomberg Road culvert
and replacement of the Parker Avenue culvert. This aiternative not
only meets the flood protection requirements but also ensures the
retention of the marsh areas which are important from the residents
point of view as well as being envJ.ronmentaily desirable.
In discussions with the Town of Richmond Hill regarding
this recommended solution, it was determined that the Town would
be replacing the Parker Avenue culvert in order to service future
development to the north and therefore the Town of RJ.chmond Hill
would bear the complete cost of replacing the culvert. As a result,
the Parker Avenue replacement was removed from this project.
Since one of the main objectives of this study was to
develop a solution which would maintain the marsh, any solution
proposed had to respect the natural stream grades through the
marsh area. Therefore, it is expected that siltation of the
natural stream channel and culverts will continue. In order to
ensure the continued efficient operation of the works, the
Authority intends to monitor the situation and when necessary would
carry out on an ongoing basis under its maintenance program, silt
removal within the stream channel. The Authority would also advise
the Town of Richmond Hill of the condition of their culverts in the
area in order that the Town could carry out a similar silt removal
program in conjunction with the Authority.
. 0 . . O' . t... 0 . 0 . . ~ . tz:'
I
W
\D
'0.. 0' .'(..0.0 ...~~ \D
\ . (-:-. ,o~ \?~ I C:O>
~-/ .... CO ..,..... "'" '1~ -' ,
. :,.c'. ~ ~'l
'; ~. _. - \..-- --
\ 1-- ... ."... ... ..".. "'-'~-'\:(
. 0 0 "
. .'. . ___ c;::l .0 .
.. 0- - ..~ n
... .~., .. 4'-
o - '~cf - ~ ,-
-. 0 .:: ::---.~ 'I j ,7 , ~:, .~
~ ~ .-.." ~-
, /' ~' ,,-- -I
-;::. .-.. . I '/ -
'\~ -. .~ q" -,'~ c.;. '~OO~(~,,,,;;o;,,-t\ " ~~ ''1,\'\oO\::> ..... .., 00, ~
\Cj, _ .-' .~. --- --j-<~ ./"-' - ," . .-""I \\ CULVERT TO BE REPLACEO~OO,.-___~(\~OO 0" ..oets O. . ~
-,\", .' -r- .....- / _.~. "'-""'" ";;._ ...(" ,n :
'\','" _ ;::f'::-:-" ' ~. \~''''~Co \) BY TowN OF RICH"O"O HILL [)QOO SCHOMBERG RO I? 0 ,~
'II ~ .. "'.. ..:/.- -""- tJ rO . ~ ''''.uu, CULvERT S'LT PE>ALVAL 0 /j\J
-." - '~... ~.__ .. \J \\00 ~ V..~ { S. \)00
)1 0 "'!c;':';'~ . . ".-,. <l' 1 ,0 ,~. 0 L- ""q" ,..,00 ....' \) ,
. ,,0 ..6". , . ' c.. .."" 'i>::J C'I"? _ .
-I" ,.p-- - \\ .. . .__) GO ~~~ rn " <i>--?C? "..... ~~~ '/ 00 "
~ . \ ,', /:. -,' '~ cw~' l?~ G"O~~, OOCJ'0 ,..,,'~ .. ~~::-.. ,'" ~\l""~' ,~;-oo()o()C>' tJ: '"
-_. \;~...... ' >tJ'l'\-~ \'~)~"'!:.I. , <:l ';:?~" , CO '" 0
'0.. M .'C..OeO .'u. ......r -........ J ...."' _.-'~' 00 .__ . ~__ _ _.)' ~Q.9~ _____ ^ c;:) G
...... to. .-~ \1 . " .";),~ 06 \;) ~
,/ ~,,~ :' " - - ,,;;....-- . 'Soo-0 .. \ [,'$ '/ C:> . o~
\\ -..--- ... \ (4.-..,(} ~-:-~ .)...' ('.... . 0
\\ ~,.,.--- ~- -\.-........ ~.. (k1:'0C,)~/, "~"JP, -, .;. --......:.'---. . 0 c::::> '
, J .. -, d.. .yl...) J' l.) U . - ~ I
II / C'~' <5 .~ Q~:;pDVoC" I)~~~~~~~~ Go c. ':~'- ..t:'=" '
I .-<0 rJ ""~\-~" ,.,.- .' 0000 ,c;:~ (l . '. ",,'\1 <J
~.:;/"\ c::J CJ CJ y..... . 0 0 'l \'._Zi ' 0 'n,:"- U- . . ........~
:--V,?' . ,)ll. . 'o<3'fl)- . "~-o~Q'. ""S:-'iS' .'
B (? c? 0 . C S -, <' 'D ~.'n 0\)1.)" ~H(, Slot " C\ ,t ~,~_.....,.- \....
. \.1 \-? - ( " \~ \) 0" \;1>" ~ ~ \\ 0'\\ ?\)O 0c~..r. \/0
,.,1 '~ ',-li.'"jl ~ \j bOo a 0
()\)b.o\:\ "" P ,."\
c.... .'OGo. c \' D ..\W 0 \) .'
,j) ., ~ 0 c.. ~
~I '... ., ."'_ ".. ~4ll.. the metropolitan toronto and region
J 14'" J ,,'- conservation authority
, 5 Shc.ehom' D"ve Dc"n,y,..., Ont]"o
M ~N I S4
TYPICAL SECTION AUGNMENT OF PROPOSEO CHANNEL ---
PrOlcct CH^r~NEL IMfl<OVEME.f-JTS. E""S r I lUMbER kIV[f~
PROPOSED CHANNEL AT Ct.!': RIDGES
1'''011 0 +155 TO ,+ In) Locof<on Lot 68, Con I 10 Wendy Way In the towr -.:f !='Ichrr.or.d HILL
at Oak J;.1r1qe~
Dote SEPT / 79 Scale I~ U 100 200
~'ETFiES
Job N! r-u Orwl.J N~-
"" .~
B-400
I. DETAILS
(c) Property Acquisition
Properties required for these works are included in the
Metropolitan Toronto and Region Conservation Authority's Master
Plan for the Acqu~sition of Flood Plain and Conservation Lands,
and as a result, will be acquired under that program and will not
form part of this project.
8-401
I. DETAILS
(d) ~
(1 ) Channelization $75,000.00
( 2) Schomberg Road 20,000.00
( 3) Engineering & Cont1ngencies 13,000.00
TOTAL $108,000.00
B-402
I, DETAILS
(d) Financ~ng
(1) Funding
Funding for these works is covered within the overall
financing provided under the Inter~m Water and Related Land
Management Project 1979-1981.
(2) Costs
Total Cost of Works $108,000.00
Authority Share 48,600.00
Province of Ontario 59,400,00
(3) Benefiting Municipality
The Regional Municipality of York has been designated
the benefiting municipality and is to be levied the Authority's
share in the amount of $48,600.00.
Page I tIlc:l
'ro: Executive Cremi.ttee, M.T.R.C.A., #17/79 (')1
::::.:.
Administration of Ontario Regulation 735/73 - July, August, September and October, 1979. t<:lo
RE: oW
c:
to<
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN t<:l
c:l
City of Brarrpton V-256, eM Consultants Ltd., _ New top of bank established as per site and office =
Lot 7, Con. 1 EHS (Bnu10 Pen) rreetings.
Southeast of Vcxiden and Main Streets July 4, 1979 .- They will watch over their CMI1 activities and correct
End of William Street when necessary.
Etobicoke Creek Watershed - Site \.ill be inspected on a ~kly basis.
Ci ty of Branpton V-257 , Annbro Construction Ltd., - See above.
Lot 7, Con. 1 EHS July 4, 1979
Southeast of vodden and Main Streets
End of William Street
Etobicoke Creek Watershed
City of Branpton V-25B, Ibddy Pollard Haulage - See above.
Lot 7, Con. 1 EHS July 4, 1979
Southeast of vodden and Main Streets
End of \-lilliam Street
Etobicoke Creek Watershed
Town. of Richrrond Hill V-259, teredi.th Dev. Ltd., _ ONnership changed prior to violation taking place.
Lot 43, Con. 1, R.P. 2027 c/o Parkway Hotels Inc., - See Heritage-Willow Estates.
~lest side of Kersey Crescent July 9, 1979
bet\Veen Yonge and Bathurst Streets
[bn River watershed
Town. of Richrrond Hill V-260, Luigi Parravarx> - Structures have been rerroved.
Pt. Lot 43, Con. 1, R.P. 2027 July 9, 1979
!ear of Kersey Crescent, west of Yonge St.
East of Bathurst Street
[bn River Watershed
1979.11.07
/It
Page' II
TO: Executive Catmittee, M.T.R.C.A., #17/79
RE: Administration of Ontario Regulation 735/73 - July, August, September and October, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
TOwn of Richmond Hill V-261, Dr. [On Carlson - Have graded area to our satisfaction and will seed
pt. Lot 66, R.P. 2027 July 11, 1979 in spring.
N/W intersection of Penberton Road
and WalIrer Road
[On River Watershed
Town of Vaughan V-262, Nick Novakovic - Filling stopped and area cleaned up.
Lot 17, Con. 8 July 12, 1979
~st side of Hwy. 27
North of Rutherford Road
North side of Esse Service Station
Htlrrber River Watershed
City of Hississauga V-263, Rmnyrrede Dev. Corp. Ltd., _ Have asked that Warren Bitulithic restore the area
Pt. Lot 1 SOS, Con. 1 July 31, 1979 to our satisfaction.
South of Dundas Street East
at the dead end of Mattawa Avenue
Behind 1960 Mattawa Avenue
Etobicoke Creek Watershed
City of Hississauga V-264, Warren Bitulithic Ltd., _ Have apologized to Ml'OCA and Runnyrrede Dev. Corp.
pt. Lot 1 SOS, Con. 1 July 31, 1979 Ltd.,
South of Dundas Street East - Have agreed to restore area.
at the dead end of Mattawa Avenue
Behind 1960 Mattawa Avenue
Etobicoke Creek Watershed
Town of Richrrond Hill V-265, Mr. & Mrs. weilekes _ Given an extension of tiTre as they may carry out
Lot 1, R.P. 1960 August 3, 1979 landscaping on subject property.
At dead end of Birch Avenue
\-est of Avenue Road, East of Bathurst St.
South of Carrville Road
Don River Watershed
1979.11. 07
/It
tll
I
01>0
0
01>0
Page III
lXl
ro: Executive Ca:mittee, M. T .R.C.A. , #17/79 I
,t.
Ac:"r.i.nistration of Ontario Regulation 0
RE: 735/73 - July, August, Septmber and October, 1979. V1
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Borough of York V-266, Mr. Luigi Calabro - Fill rerroved fran site.
Northeast quadrant of Eglinton Avenue August 14, 1979 - No further action necessary.
at Jane Street
Hurrber River \'latershed
City of Mississauga V-267, Direct Systems - Pulled fill back to an agreed-upon location.
Block 'A', 'E', R.P. 904 August 23, 1979 - Seeded slope and other disturbed areas.
East of Seoond Line, \'2st of t-1aingate Dr.
North of Eglinton Avenue off the cul-de-
sac of Haultain Court
Etobiooke Creek Watershed
City of Mississauga V-268, Focal properties Ltd., - See above.
Block 'A', 'E', R.P. 904 August 23, 1979
East of Seoond Line, \-est of Maingate Dr.
North of Eglinton Avenue off the cul-de-
sac of Haultain Court
Etobiooke Creek Watershed
City of t-tississauga V-269, Stacey Const. Ltd., - See above.
Block' A', 'E', R.P. 904 August 23, 1979
East of Second Line, ~st of Naingate Dr.
North of Eglinton Avenue off the cul-de
sac of Haultain Court
Etobiooke Creek Watershed
City of russissauga V-270, Runble Contracting Ltd., - See above.
Block 'A', 'E', R.P. 904 August 23, 1979
East of Seoond Line, ~st of Maingate Dr.
North of Eglinton Avenue off the cul-de
sac of Haultain Court
Etobiooke creek \'latershed
1979.11. 07
lit
Page IV
TO: Executive Carmittee, M.T.R.C.A., #17/79
RE: Administration of Ontario Regulation 735/73 - July, August, SeptelTber and October, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
.
Town of Richrrond Hill V-271, Heritage-Willow Estates - Ieroved fill.
Lot 51, Block 'B', COn. 1 WYS, R.P. 2027 August 24, 1979 - Graded site.
across from ~st end of Yongehurst M., - Erected fence.
~1est of Kersey Crescent between Yonge - Are getting signs posted
and Bathurst Streets
[On River Watershed
Town of Vaughan V-272, Mr. Giuseppe Cappelletto - Fill rerroved and area reshaped to the satisfaction
Lot 5, COncession 7, R.P. 64R-2630 September 4, 1979 of the staff.
South of Hwy. #7, D:!ad end of Wallace St.
Humber River Ivatershed
Town of Caledon V-273, Luigi and Francesco - Dumping stopped. ("
Lot 4, COn. 4 Stellato - Sone fill rerroved.
North of Wild field Road, South of September 6, 1979 - Will act further \.men Hurrber flcx:xlline mapping is
5th Sideroad, East of 4th Line complete for this area.
Humber River Watershed
Town of Caledon V-274, Super Disposal Services - See above.
Lot 4, COn. 4 September 6, 1979
North of Wild field Road, South of
5th Sideroad, East of 4th Line
Humber River Watershed
.
Borough of Etobicoke V-275, Luigi Russignan - Area restored.
rest side of R::>yal York Road September 13, 1979 - Final seeding or sodding remains to be done.
South of Eg1inton Avenue
Hurrber River Watershed
1979.11. 07
11t
OJ
I
.co
0
0'1
Page V
tIl
TO: Executive carmittee, t-1.T.R.C.A., 111/79 I
,I>.
Administration of Ontario Regulation 735/73 - 0
RE: July, August, SepteJlber and October, 1979. -..J
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
Borough of Etobicoke V-276, r-Enmi Excavating - See previous violation (V-275)
~st side of )byal .York Ibad~ September 13, 1979
South of Eglinton Avenue
Hurrber River \'latershed
To.-m. of Richrrond Hill V-277, Antonietta pacitto - Stopped dtmping at present.
Lot 96, Con. 1 WYS, R.P. 1923 September 25, 1979 - ~'laiting for pennit application to be sul:mitted.
North side of \~ldrick Read
East of Walrrer lbad between
Bathurst and Yonge Streets
Don River \'la tershed
City of North York V-278, volturno Excavating Co., - See following violation (V-279)
Lots 28 and 29, R.P. 2069 September 280,\ 1979
East side of Bathurst Street
IJ, blocks north of Sheppard Avenue
Don River \'latershed
City of North York V-279, Cadillac-Fairview (brp. - Cadillac has agreed to restore the area and no
Lots 28 ~~d 29, R.P. 2069 September 28, 1979 further filling has taken place.
East side of Bathurst Street
l~ Blocks north of Sheppard Avenue
Don River Watershed
Town of Pickering V-280, William Ryan Glthrie AND - Wanring notice retumed unclairred.
Lot 154, R.P. 816 Debra Marie Waslak - Property ownership has changed hands.
Rear of 1406 Old FOrest Road Septerrber 28, 1979 - FOllow-up underway.
East bank of Petticoat Creek
North of Hwy. #2
Petticoat Creek Watershed
.
1979.11.07
/It
Page VI
TO: Executive Ccrnnittee, M.T.R.C.A., #17/79
RE: ACministration of Ontario Regulation 735/73 - July, August, Septerrber and October, 1979.
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
T<:Ywn of Markham V-28l, Unionville Fairways Ltd., - Permit applied for.
Lot 10, Con. 5E c/o Muriel Williams - Verbal permission given for serre restorative work
South of Hwy. #7 October 1, 1979 to be carried out.
West of Kennedy FDad
FDuge River Watershed
Borough of Etobiooke V-282, Mr. William Tkachuk. - O.vner has applied for a permit and staff has
!ear of 156 Humbervale Blvd., October 5, 1979 recanrrended the issuance of sane.
South of Glenroy Avenue - W:)rk to be oorrpleted before November 30, 1979.
Mimioo Creek Watershed .
Borough of Etobiooke V-283, Gabion Erosion Control - See above. .
Fear of 156 Humbervale Blvd., October 5, 1979
South of Glenroy Avenue
Mimico Creek \'latershed
T<:Ywn of Ajax V-284 , Blue Maple Holdings - Unclairred at address registered by Ajax assessrrent.
South pt. Lot 5, Range 3 October 12, 1979
West of Shoal Foad
North of Range Line FDad
Carruthers Creek Watershed
T<:Ywn of Ajax V-285, Blue f-Iaple Holdings - !eceipt acknowledged through agent.
South pt. Lot 5, Range 3 October 19, 1979 - r-Eeting to be arranged with violator, T<:Ywn of Ajax
t-Jest of Shoal Foad and MI'OCA staff in order to resolve situation.
North of Range Line FDad
Carruthers Creek Watershed
1979.11,07
/It tIl
I
~
0
CD
Page VII tll
TO: Executive Ccmnittee, M.T.R.C.A., #17/79 I
~
Administration of Ontario Regulation 735/73 - July, August, SeptE~ and October, 1979. 0
RE: \0
LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN
City of Mississauga V-286, Pacific Paving Limited - Owner will be sul:mitting letter regarding restoration
lDt 5, Con. 4 EH5 OCtober 24, 1979 of slopes.
South of Bri ttania lbad
E/5 of 4 th Line East
Etobicoke Creek \\'atershed
Town of Caledon (01inguacousy) V-287, David Tait and patricia - o.vner has contacted. this Authority for further
lDt 20, Con. 4 \oJI15 \'lalker advice.
North of 17th 5ideroad on October 24, 1979 - f.Eeting has been arranged.
E/5 of 4th Line West
Northv.est of Allca
Etobicoke Creek Watershed
1979.11.07
/It
C\.. B-410
,
the metropoUtan toronto and region conservation authority
minutes Report 118/79
EXECUTIVE COMMITTEE WEDNESDAY-DECEMBER-S-1979 118/79
~
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, December 5, 1979, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning and Policy W.A. McLean
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & POlicy Mrs, A. C . Deans
Development Coordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
HEARING
Following the Roll Call, the meeting recessed to hold a Hearing re:
Kingspoint Developments
City of Brampton
Etobicoke Creek Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chainnan Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs, L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
1,dJu . - Historical Sites Division R.K. Cooper
Adm. - Finance Division G. Dudar
Adm. - Conservation. Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
. Adm. - Property & Administration Division W.E. Jones
'.
B-411 ...2-
PRESENT FOR THE MEETING (Contd.)
Executive Secretary Mrs. K. Conron
Research Planner, Planning & Policy Mrs. A,C. Deans
Development Coordinator, Planning & POlicy J.W. Maletich
Bead, Flood Control Section, WRD J .C. Mather
MINUTES
The Minutes of Meeting 117/79 were presented.
Res. 1488 Moved by: E.B. Card
Seconded by: E.V. Rolb
RESOLVED THAT: The Minutes of Meeting 117/79, as presented, be adopted as if read,
CARRIED,
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF.THE
AUTHORITY AND RECOMMENDS ITS ADOPTION:
1- PERSONNEL SUB-COMMITTEE
-Report #6/79
Mrs. Hancey presented Report 16/79 of the Personnel Sub-Committee.
Res. 1489 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: Report 16/79 of the Personnel Sub-Committee be received, and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations Nos. 10 and 13, as
contained therein and set forth herein, be approved:
110 REMUNERATION OF THE CHAIRMAN AND VICE CHAIRMAN
The Authority make application to the Ontario Municipal Board for
authorization to pay the Chairman $18,000.00 per annum and the
Vice Chairman $7,000.00 per annum, effective January 1, 1980.
113 MEMBERS - PER DIEM
The Authority make application to the Ontario Municipal Board for
authorization to pay members per diem in the amount of $45.00,
effective January 1, 1980. CARRIED J
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
2. MANAGEMENT STUDY REVID~ SUB-COMMITTEE
-Report of Meeting 15/79
Report 15/79 of the Management Study Review Sub-Committee was presented for con-
.ideration of the Executive Committee.
Res. '490 Moved by: Mrs. F. Gell
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Report of Meeting #5/79 of the Management Study Review Sub-
Committee be received and the recommendations as contained therein, as amended and
set forth herein, be adopted:
I. THAT the Final Report - Organizational Review Phase I: The Metropolitan
Toronto and Region Conservation Authority, October, 1979, of Hickling-
Johnston Limited, Management Consultants, be received, and
THAT the following action be taken:
(a) The Executive Committee review and re-state the Authority's role
for the 1980's1
(b) The Executive Committee examine procedures for ensuring that policy
and planning matters are more fully dealt with on a continuing~J
(c) Additional meetings of the Executive Committee and the Personnel
and Finance Sub-Committees be scheduled in 1980.
.
-3- 8-412
II. THAT the Secretary-Treasurer be requested to prepare a report and
recommendations, for consideration by the Personnel Sub-Committee on the
staff organizational structure of the Authority, including the strength-
ening of the Personnel Management function of the Authority.
III. THAT the Information and Education Advisory Board be requested to develop
specific programs for improving the ~fectiveness of the Authority in
relation to its fundiag agencies and their constituencies to ensure that
its financial requirements are met insofar as possible;
AND to prepare a report and recommendations for the consideration of the
Executive Committee.
IV. THAT the staff report on Data Processing be received and appended as
Schedule "A" of these Minutes; and
THAT budget provision be made in 1980, in the amount of $13,000.00 to
carry out a study of the Authority data processing needs;
AND FURTHER THAT the Data Processing Study be integrated with the report
and recommendations of the secretary-Treasurer as set forth in
Recommendation II of this report.
V. THAT the Secretary-Treasurer be directed to review the principles by
which the Authority remunerates all of its staff, inclusive of fringe
benefits, and to make recommendations for the consideration of the
Personnel Sub-Committee. CARRIEDr
3. THE CHAIRMEN'S COMMITTEE OF THE ONTAnIO CONSERVATION AUTHORITIES
-Proposed Expansion of Chairmen's Committee Office
,
'The Chairman presented a letter, da ted November 20', 1979, received from the
Chairman of The Chairmen's Committee of the Ontario Conservation Authorities,
together with a resolution adopted at a general meeting of chairmen on
November 19, 1979.
Res. 1491 Moved by: C.F. Kline
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority re-
affirm Resolution #109 of the Executive Committee, adopted April 25, 1979, as
followtf:
"Iles. '109 Moved by: J.S. Scott
Seconded by: C.F. Kline
WHEREAS The Metropolitan Toronto and Region Conservation Authority supports The Chairmen's
Committee of the Ontario Conservation Authorities, and the role and function that the
Committee presently performs in presenting a common viewpoint to the Government of the
Province of Ontario in matters affecting conservation authorities;
AND WHEREAS there are, within the conservation authorities of Ontario, substantial staff
resources to provide the necessary background information and analysis which reflect the
concerns of individual authorities and groups of authorities which it would be difficult
for staff of the Chairmen's Committee to provide;
AND WHEREAS the Authority is of the opinion that matters of policy affecting individual
authorities or groups of authorities are the responsibility of such authorities or groups
of authorities;
THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region Conservation Authority
advise The Chairmen's Committee of the Ontario Conservation Authorities that it does not
aupport the proposal to engage a full-time Secretary-Manager/Executive-Secretary on the
basis set out in the proposal received under date of April 5, 1979;
AND BE IT FURTHER RESOLVED THAT The Authority would not support the proposed levy to
finance the expansion of the Chairmen's Committee office. CAllllIED;"
-and
THAT the Chairman of the Authority be requested to report to the Executive
Committee on any further developments in connection with this matter. CARRIED,
4 . PERSONNEL SUB-COMMITTEE
-Report 16/79
Mrs. Hancey presented Report 16/79 of the Personnel Sub-Committee.
-
Res. 1492 Moved by: Mrs. L. Hancey
Seconded by: B.B. Card
RESOLVED THAT: Report ~6/79 of the Personnel Sub-Committee be received and
appended as Schedule "B" of these Minutes; and
THAT Items Nos. 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 and 12, as contained therein, be
approved. CARRIED;
B-413 -4-
5. ONTARIO RECREATIONAL CANOEING AFFILIATION MEETING, BOYNE RIVER
NATURAL SCIENCE SCHOOL', SHELBURNE, ONT., DECEMBER 7-9, 1979
-Attendance at
A staff communication was presented advising that the above meeting is being
held to decide the format and standards to govern canoe instructional
programmes. The format and standards set will govern tbe programme operated
by the Authority at the Claireville Conservation Area. Mr. A. Wickens is a
member of Canoe Ontario and this association is prepared to pay his travel
cost to attend the meeting. Registration, two nights' accommodation and meals
are the responsibility of the participant.
Res. '493 Moved by: E.V. Kolb
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Mr. Andy Wickens be authorized to attend the Ontario
Recreational Canoeing Affiliation meeting at the Boyne River Natural Science
School at Shelburne, Ontario, to be held December 7-9, 1979; and
THAT his expenses in connection therewith, in the amount of $40.00, be paid.
6. DECISION OF HEARING CARRIED;
-Kingspoint Developments
Ci ty of Brampton (Etobicoke Creek Watershed)
Res. '494 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: This Executive Committee confirm the decision of the Bearing
held this 5th day of December, 1979; and
THAT the application of Kingspoint Developments, in accordance with Ontario
Regulation 735/73, for permission to construct a building and regrade a
portion of the property in an area regulated by this Authority, and being
Part of Schedule 1, more specifically Sheet No.16 of the Flood Line Map of the
Etobicoke Creek, and Part of Block 1, Registered Plan A-2l, City of Brampton
(Etobicoke Creek watershed), be approved, subject to:
(a) All the cut and fill operation deemed necessary taking place within the
area of the subject property boundaries (i.e., the church site),
(b) All disturbed areas being landscaped and restored to the satisfaction of
the Au tho ri ty ;
(c) No depressions or ponds being created as a result of the alteration of
the existing contours;
(d) The proposed sanitary sewer and storm sewer being constructed and
installed in such a manner as not to interfere with the control of
flooding;
(e) No earth berms being constructed across the flood plain of the Etobicoke
Creek;
( f) Every effort being made to avoid silting of the Etobicoke Creek during
construction;
(9) All work being completed to the satisfaction of The Metropolitan Toronto
and Region Conservation Authority.
On a recorded vote - voting "YEA": 8 Voting "NAY.: 4
M.W.H. Biggar R.G. Henderson
M.J. Breen Mrs. F. Gell
E.H. Card C.F. Kline
Mrs. J.A. Gardner J.S. Scott
Mrs. L. Hancey
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin CARRIED,
7. FINANCIAL REPORT AND ACCOUNTS
-October, 1979.
Mr. Scott presented the Financial Report and Accounts for the month of
October, 1979.
Res. '495 Moved by: J.S. Scott
Seconded by: E.H. Card
0
-~ 8-414
RESOLVED THAT: The Financial State~ent for the month of October, ~979, be
received; and that the puyment of the Authority accounts, in the amount of
$1,319,515.00, being (a) Current Expenditures - Wages and Salaries
$272,129.26; Materials & Supplies $221,958.56: (b) Capital Expenditures -
Wages & Salaries $29,981.48: Materials & Supplies $777~736,46: and (c) Other
Programs - Wages & Salaries $5,856.40: Materials & Supplies $11,852.84, be
approved.
CARRIED;
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Regional Municipality of Peel
To construct a watermain crossing a tributary of the
Humber River, Gore Road, City of Brampton
A staff communication was presented advising that an application has been
received from The Regional Municipality of Peel to construct a watermain
crossing at the above location.
Res. '496 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of The
Regional Municipality of Peel, be received: and
TH~ the application of The Regional Municipality of Peel for permission to
construct a watermain crossing on Lot 9, Concession 9, Humber River water-
shed, be approved, subject to:
(a) The river configuration being maintained after construction;
(b) Every effort being made to minimize silting of the creek during
construction;
(c) Provision being made to allow for continuous flow in the creek;
(d) All areas disturbed due to construction being restored to the
satisfaction of the Authority:
(~ Plan Number 3736-0 forming a part of the permit.
. .. . . CARRIED;
9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Regional Municipality of Peel
To cross a tributary of the Humber River with watermain,
intersection of Gore Road and 15th Sideroad,
City of Brampton
A staff communication was presented advising that an application has been
received from The Regional Municipality of Peel for permission to cross the
Lindsay Creek (a tributary of the Humber River) with a watermain at the above
location.
Res. '497 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of The
Regional Municipality of Peel, be received: and
THAT the application of The Regional Municipality of Peel for permission to
place a watermain crossing the Lindsay Creek on Lot 15, Concession 10, City
of Br~mpton (Humber River watershed), be approved, subject to:
(a) The crossing being restored with rip rap on the banks and bed of the
river. The rip rap must be preceded by a filter mat or a 6"-12"
layer of crushed stone;
(b) The river configuration being maintained after construction;
(c) Every effort being made to minimize silting of the creek during
construction;
(d) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(e) provision being made to allow for continuous flow in the creek.
CARRIED;
8-415 -6-
10. APPLICATION' FOR PERMIT UNDER ONTARIO REGULATION 735/73
City of Mississauga
To construct the Dundas Street East storm sewer,
immediately west of the Etobicoke Creek
A staff communication was ~resented advising that an application has been
re~eived from the City of Mississauga for permission to construct the Dundas
Street East storm sewer with outfall into the Etobicoke Creek.
Res. 1498 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of the
City of Mississauga, be received; and
~T the application of the City of Mississauga for a permit to construct the
Dundas Street East storm sewer and outfall located immediately west of the
Etobicoke Creek, be app roved, subject to:
(a) The rip ra~ protection being extended into the creek in order to
reduce the'.possibili"ty of the creek bed being eroded,
(b) All areas disturbed due to construction being restored to the
satisfaction of the Authority;
(c) Plans C-16691, C-16692 and C-l6704 forming part of the permit;
(d) Every effort being made to minimize silting of the creek.
CARRIED,
11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. & Mrs. G.K. Moore
To construct addition to existing dwelling at
97 Clarence Street, Woodbridge, Town of Vaughan
(Humber River Watershed)
~ At~ff communication was presented advising that an application has been
received from Mr. and Mrs. G.K. Moore for pe~~ission to construct a l4'x20'
addition to an existing dwelling at the above location.
Res. 1499 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of Mr.
and Mrs. G.K. Moore, be received; and
THAT the application of Mr. and Mrs, G.K. Moore for permission to construct
an addition to an existing dwelling on Part of Lot 8, R.P. 546, Town of
Vaughan (Humber River watershed), be approved, subject to:
(a) All excess excavated material being removed from the lot,
(b) All work being in accordance with the construction drawings
da ted Ma y 20, 1979, as prepared by R. Perri,
(c) Drawings Nos. 1 to 4, project No. 79025, forming part of the
permi t,
Cd) All work being completed to the satisfaction of the Town of
Vaughan and of The Metropolitan Toronto and Region Conservation
Authority.
CARRIED,
12. . APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Grace Retirement & Community Enterprises
To construct Senior Citizens' apartment building,
Part Lot 30, Brampton #2, corner Maple & Nelson Streets,
City of Brampton (Etobicoke Creek Watershed)
A staff communication was presented advising that further to decision of
the Hearing Board of July 25, 1979, the applicant has submitted a site
conceptual plan in accordance with the following resolution:
-7- 1-416
"DECISION OF HEARING
-Hr. J.C, Enos - on behalf of -
Hr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.)
City of Brampton
!tobicoke Creek Watershed .
Res. 1289 Hpved by: J.S. Scott
Seconded by: C.F. Kline
BE IT RESOLVED THAT: This Executive Committee confirm the decision of
the Bearing held this 25th day of July, 1979; and
THAr the application of Mr. J.C. Enos on behalf of Mr. Arthur Morrison
(Grace Retirement and Community Enterprises Inc.), in accordance with
Ontario Regulation 735/73, for permission to construct a senior
citizens' apartment building on Part of Lot 30, Brampton No.2, being
the corner of Maple Street and Nelson Street in the City of Brampton
(Etobicoke Creek watershed), be deferred until such time as the
applicant is prepared to submit to the Authority a site concept plan in
accordance with the conditions as stated in Section 6 (subsection 1) of
Ontario Regulation 735/73. CAllI.IED;"
Res. #500 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOL VED THAT: The staff communication, as amended, together with the
application of Grace Retirement and Community Enterprises Inc., be receivedJ
and
THAT the application of Grace Retirement and Community Enterprises Inc. for
permission to construct a senior citizens' apartment building on Part of Lot
30, Brampton No. 2, being the corner of Maple and Nelson Streets in the City
of Brampton (Etobicoke Creek watershed), be approved, subject to:
(a> The Authority receiving detailed site and engineering plans consonant
with the conceptual plan as submitted by the applicant as it relates
to the final construction of the building, and which will satisfy the
flood control requirements of the AuthoritYJ
(b) Every effort being made to minimize si~ting of the creek during
construction.
CARRIED 1
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
The Regional Municipality of Durham
To place fill within the flood plain of the Duffin Creek,
Part Lot 1 and Lot 12, Range 3 Front Concession
A staff communication was presented advising that an application has been
received from The Regional Municipality of Durham for permission to construct
a berm within the flood plain of the Duffin Creek at the above location.
Res. 'SOl Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
The Regional Municipality of Durham, be received I and
THAT the. application of The Regional Municipality of Durham for permission
to place fill within the flood plain of the Duffin Creek, on Part Lot 1
and Lot 12, Range 3 Front Concession (Duffin Creek watershed), be approved.
CARRIEDJ
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Maria & Heinz Ruckdaeschel
TO install two culverts on tributaries of the Duffin
Creek, Part Lot 3, Concession 3, Township of UXbridge
A staff communicat~on was presented advising that an application has been
received from Maria and Heinz Ruckdaeschel for permiSSion to install two
culverts at the above location.
Res. .502 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
8-417 -8-
RESOLVED THAT: The staff communication, together with the application of
Maria and Heinz Ruckdaeschel, be received~ and
THAT the application of Maria and Heinz Ruckdaeschel for permission to
install two culverts on tributaries of the Duffin Creek, on Part Lot 3,
Concession 3, Township of Uxbridge (Duffin Creek watershed), be approved,
subject to: ,
(a) All work being completed in accordance with the drawings prepared
by the applicants and submitted with their application, which will
form part of the permit~
(b) Every effort being made to minimize the silting of the creek
during construction;
(c) All areas disturbed due to the installation of the culverts being
restored to the satisfaction of the Authority and of the Township
of Uxbridge.
CARRIEDJ
15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
U~ban & Country Development Limited
To construct 6" dia. PVC watermain cros~ng of the
Centreville Creek, Lot 1, Registered Plan #1000, Town
of Caledon (Humber River Watershed)
A staff communication was presented advising that an application has been
received from Urban & Country Development Limited for permission to construct
a 6- dia. PVC watermain crossing at the above location.
Res. '503 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Urban & Country Development Limited, be received~ and
THAT ~he application of Urban & Country Development Limited for permission to
construct a watermain crossing of the Centreville Creek, on Lot 1, Registered
Plan '1000, Town of Caledon (Humber River watershed), be approved, subject tOI
(a) All work being done in accordance with Drawing t18, File 7403-A-l8, as
prepared by Paul Theill Associates Limited and dated June, 1979~
(b) All disturbed areas being restored to the satisfaction of the Town of
Caledon and of The Metropolitan Toronto and Region Conservation AuthoritYJ
(c) Every effort being made to minimize erosion and siltation along the creek
during construction.
CARRIEDJ
16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Joseph Grell
To place fill and construct factory building vicinity
of Maple Avenue and Duncan Road, Town of Richmond Hill
(Don River Watershed)
A staff communication was presented advising that an application has been
received from Joseph Grell for permission to place 1.04 m. of fill at the
above location.
Res. '504 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Joseph Grell, be received; and
THAT the application of Joseph Grell for permission to place fill an~ to
construct an industrial building on Lot 30, Registered Plan 3805, Town of
Richmond Hill (Don River watershed), be approved, subject to:
(a) All work being 'done in accordance with the plan prepared by Stehower.
Landscape Contractors and dated June 12, 1979~
I ji.~~'I)) ,All excess fill being removed f~C?m ~ s~ te immediately after gradinq
and construction is completed: .
CARRIEDJ
-9- 8-418
17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Joseph Kaufmann (The Ki tchen Cen tre)
To place fill for development of parking lot at rear of
'2050 Dundas Street East in conjunction with construction
of addition to existing structure, City of Mississauga
(Etobicoke Creek Wa tershed).
A staff communication was presented advising that an application has been
received from Joseph Kaufmann for permission to undertake the above-noted
works.
Res. '505 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Joseph Kaufmann, be received; and
THAT the application of Joseph Kaufmann for permission to place fill for a
proposed parking lot on Lot 1, Concession 1, S.D.S., (Etobicoke Creek
watershed) be approved, subject to:
(a) The applicant complying with all municipal by-laws and regulations~
(b) All areas disturbed due to construction being restored to the satis-
faction of the Authority;
(c) A snow fence being erected along the south and west periMeter of the
parking lot and remaining in good condition throughout the
construction period;
(d) All excess fill material being removed from the site;
(d) A permanent barrier being placed around the south and west perimeter
of the parking lot.
CARRIED;
18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Glynnwood Gate Corporation
TO construct a retirement residential building on Part
of Lot 30, Concession 1, just south of #7750 Bayview
Avenue, Town of lo1.arkham (Don River Watershed)
A staff communication was presented advising that an application has been
received from Glynnwood Gate Corporation for permission to construct a
retirement residential building at the above location.
Res. '506 Moved by: Mrs. L. Hancey
Seconded by: C.F. Kline
RESOLVED THAT: The staff communication, together with the application of
Glynnwood Gate Corporation, be received; and
THAT the application of Glynnwood Gate corporation for permission to construct
a retirement residential building ~n Part of Lot 30, Concession 1, west side
of Bayview Avenue, Town of Markham (Don River watershed), be approved, subject
to:
(a) All surplus excavated material being removed from the site~
(b) All work being undertaken in accordance with site grading plan,
Job '7302, Plan #2, as prepared by Jackson Ypes Associates
Architects and Planners;
(c) The application complying with all municipal requirements,
(d) Every effort being made to minimize silting of the Don River
during construction.
CAlmIED~
B-419 -10-
19. THE MUNICIPALITY OF MEtROPOLITAN TORONTO
-Request for Permanent Easement: south of Steeles Avenue
west of Islington Avenue
A staff communication was presented advis~ng that a request has been received
from The Municipality of Metropolitan Toron~ to provide a permanent easement
for a sanitary trunk, sewer'south of $teeles Avenue, west of Islington Avenue,
in the Rowntree Mill Road area.
The proposed easement affects Authority-owned lands in the Borough of
Etobicoke and the City of North York.
Res. '507 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: A permanent easement be granted to The Municipality of
Metropolitan Toronto for a sanitary trunk sewer located south of Steeles
Avenue, west of Islington Avenue, in the Rowntree Mill Road area. Said ease-
ment affects Authority-owned land known as Parts of Lots 21, 22 and 23,
Concession VII, W.Y.S., and Parts of Lots lO, 11, 12, 13, 25, 33, 34, 35, 36,
37, 38, 39, 40, 41, 42 and 43, Registered Plan 2388, City of North York, and
Part of Lot 40, Concession 'A', F.T.H. in the Borough of Etobicoke. Said
lands are designated as Part 1 on Plan 64R-2079, Parts 1, 2, 3, 4, 5 and 6 on
Plan 64R-6403, Parts 1 and 2 on Plan 64R-537l and Parts 1 and 2 on Plan
64R-6l98, in The Municipality of Metropolitan Toronto. The easement to be
granted for the nominal consideration of $2.00, subject to The Municipality of
Metropolitan Toronto being responsible for carrying out and paying all legal,
survey and other costs involved in the transaction; and
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect therebo
20. CITY OF NORTH YORK CARRIED;
-Request for Permanent Easement: east of the North York
General Hospital, south side of Sheppard Avenue
A staff communication was presented advising that a request has been receiv~d
from the City of North York to provide a permanent easement for a sanitary
aewer, located to the east of the North York General Hospital on the south
aide of Sheppard Avenue.
Res. '508 Moved by: M.W.B. Biggar
Seconded by: Mrs. F. Gell
RESOLVED THAT: A permanent easement be granted to the City of North York for a
aanitary sewer located to the east of the North York General Hospital, on the
south side of Sheppard Avenue. Said easement affects Authority-owned land
known as Part of Lot 15, Concession III, E.Y.S., City of North York, The
Municipality of Metropolitan Toronto, desiqnated as Part 3 on Plan 65R-7982.
The easement to be granted for the nominal consideration of $2.00, subject ~
the City of North York being responsible for carrying out and paying all
legal, survey and other costs involved in the transaction; and
BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be
authorized and directed to sign the necessary documents to give effect
thereto.
CARRIED;
21. DOWNSTREAM EROSION CONTROL
. -Contribution by Private Owners
A staff report was presented having regard to the matter of private owner
contribution to downstream erosion control.
Res. '509 Moved by: J.S. Scott
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Flood Control and Water Conservation Advisory Board be
requested to make recommendations for an appropriate contribution rationale
for private owners. benefiting from an Erosion and Sedimentation Control
Programme, in accordance with Authority Resolution '78/79, as follows:
".... 178 Moved by: '.J. McKechnie
Seconded by: Mra. H. Pownall
II IT RESOLVED THAT: The Executive Colllllittee of the Authority review and
-11-: 8-420
report to a future Authority meeting on the sliding scale of payments
required of property owners in projects where bank stabilization and
erosion control works are required, taking into account all factors,
including:
(a) The type of structure t~ be protected, i.e.~ private home,
business premis~s, high rise apart~ents, both condominium
and rental;
(b) The ability of owners to write off costs, i.e., private
home versus apartment business;
(c) Cost of work to the Authority;
(d) Possibility of assessing municipality as benefiting
municipality. CARRIED;"
CARRIED,
22. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981:
Proposed Major Remedial Work: Nos.27-3l Alamosa Drive,
City of North York (Don River Watershed)
-OWner Contribution
A staff communication was presented advising that the Erosion Control and
Slope Stabilization work programme for 1980 includes Nos. 27-31 Alamosa Drive,
City of North York, as a priority site scheduled for remedial work in 1980.
Res. '510 Moved by: Mrs. F. Gell
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Prior to slope stabilization work being carried out at the
rear of Nos. 27-31 Alamosa Drive, City of North York (Don River watershed) ,
the benefiting property owners be required to contribute $4,300.00 towards
the cost of the work; and
THAT the benefiting property owners be further required to provide a permanent
easement to the parcel of land on which remedial work is proposed.
CARRIED,
23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control & Slope Stabilization in The Regional
Municipality of Peel: proposed Remedial Work - wildwood
Park and vicinity, City of Mississauga (Mimico Creek
Watershed)
A staff communication was presented advising that, as outlined in the staff
report entitled "Erosion Control and Bank Stabilization in the Regions of
Peel, York and Durham", which was approved by the Executive Committee at
Meeting 115/78, remedial work is proposed at wildwood Park in the City of
Mississauga.
Res. '511 Moved by: I.V. Kolb
Seconded by: Mrs. F. Gell
RESOLVED THAT: Erosion control work be carried out at Wildwood Park and
vicinity, City of Mississauga (Mimicocreek watershed), at an estimated cost
of $16,000.001 and
THAT the,approval of the Ministry of Natural Resources be requested.
CARRIED;
24. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quotation: Septic System, Phase II
A staff communication was presented advising that the following quotations
have been received for the supply and installation of a septic tank,system
for Phase II of the Lake St. George Conservation Field Centre:
Contractor Price Quoted
Burns Septic Tank Company Limited $4,500.00
(Newmarket)
Harry Smith & Sons $4,760.00
(awarded Phase I contract)
B-421 -12-
Contractor Price Quoted
A.B.C. Sanitary Contractors No bid
(Richmond Hill)
Weldrick Construction Company No bid
(lU:chmond Hill)
Res. .512 Moved by: B.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The quotation of Burns Septic Tank Company Limited, for the
.upply and installation of a septic tank system for Phase II of the Lake St.
George Conservation Field Centre, in the amount of $4,500.00, be accepted,
it being the lowest quotation received.
CARRIED;
NEW BUSINESS
25. SEMINAR FOR CAMP GROUND OPERATORS
Res. '513 Moved by: Mrs. F. Gel!
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff be directed to prepare a report, for consideration
by the Executive Committee, regarding the advisability of a seminar for camp
ground operators being held by The Metropolitan Toronto and Region
Conservation Authorities for interested Authorities in Ontario.
CARRIED;
26. MANAGEMENT STUDY REVIEW SUB-COMMITTEE
-Appreciation
Res. '514 Moved by: M.W.H. Biggar
Seconded by: Mr.. J .A. Gardner
RESOLVED THAT: The Chairman of the Management Study Review Sub-COJllllittee be
thanked for his excellent work in connection with the work of the committee.
CARRIBD,
27. MINUTES - COMMITTEES AND SUB-COMMITTEES
Res. . 515 Moved by: J.S. Scott
Seconded 'by: Mrs. S. Martin
RESOLVED THAT: Commencing on January 1, 1980, Minutes of all Committees and
Sub-Commi ttee meetings be recorded in a similar manner to those of Advisory
Board meetings. CARRIED;
28. -THE EVOLUTION OF ENVIRONMENTAL ASSESSMENT IN
TRANSPORTATION PROGRAMS IN ONTARIO"
MR. BIGGAR advised that he had received the above tentative statement and
would make this available to the staff. He believes the statement to be a
u.eful discussion paper, and requested that staff comment upon and circulate
the paper to the Executive Committee members.
29. MEETING '19/79 - DECEMBER 19, 1979
MR. HENDERSON advised that the meeting of December 19 will be held at the
Authority office, and will be followed by luncheon at the Kortright Centre
for Conservation at 12:30 p.m.
30. ADJOURNMENT
On Motion, the Meeting adjourned at 1:45 p.m., December 5.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
B-422
SCHEDULE "A-
REPORT ON DATA PROCESSING
The staff has given consideration to the use of data processing systems in the
Authority's operation. An overview s~udy of our operations indicates that
there' is potential for more effective use of staff time, more complete and
timely reporting and more effective record keeping with the use of data
processing equipment. The overview indicated that the areas in which such
equipment may be of assistance are in our cost control and reporting system,
accounting system, inventory system, word processing system, information
retrieval system and engineering data. The overview has also indicated that,
should data processing be found to be cost effective for the Authority, there
is a wide range of equipment and systems available. There is also a number of
op~ions for the Authority in obtaining data processing equipment. These
options include purchase, rental and terminals tied into other private or
government systems.
The only use the Authority presently makes of data processing equipment is the
bookkeeping machine used in the payroll and accounts section and work that is
contracted to others for specific projects. The bookkeeping machine is being
used to the extent of its capabilities, and further mechanization of office
procedures is not possible on this machine.
The extent to which the Authority can properly make use of data processing
equipment requires professional advice based on a thorough understanding of the
Authority's operations. Consulting services are available from a number of
sources, including the Province of Ontario and The Municipality of Metropolitan
Toronto, who will provide consulting services based on the equipment and
services which they can provide. Advice is also available from the manu-
facturers of equipment. Such advice would be best provided by an independent
consultant with experience in devising systems for public agencies like the
Authority and who can evaluate how the Authority would best be serviced, whether
that be tying into an existing government system, making use of private
facilities or owning our own equipment.
Staff contacted an independent consultant in the field, Gordon Molnar &
Associates Limited, and discussed with them the type of information that is
required in order for the Authority to make the proper decisions as to the
effective use of data processing equipment. A study of the Authority's
operations, with the following components, is necessary to analyze the current
and future needs of the Authority:
(a) Survey the information needs of the Authority in each Division and
prepare information requirements;
(b) Examine each Division's requirements within the following functional
areas:
.cost control and reporting system
.accounting system
.inventory system
.word processing system
.information retrieval system
.engineering system
(c) To propose solutions to the problems and needs identified in each
functional area that is technically, operationally and economically
feasible;
(d) To include in the review of solutions an examination of the data
processing services which may be available fran the Province of
Ontario and the Authority's member municipalities~
(e) To prepare terms of reference for the design and implementation of a
system appropriate for the Authority.
The consultant has advised that the cost of such a study would be approximately
$13,000.00.
B-423
SCHEDULE "B"
THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
REPORT #6/79
PERSONNEL SUB-CO~~ITTEE
The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive,
DOWNSVIEW, Ontario on Wednesday, November 28, 1979 commencing at 10:00 a.m.
PRESENT WEP.E
Chairman Mrs. L. Hancey
Members M. J. Breen
E. V. Kolb
Dr. T. H. Leith
Mrs. S. Martin
Authority Chairman R. G. Henderson
Authority Vice-Chairman Mrs. F. Gel!
Authority Member J. S. Scott
Secretary-Treasurer It. G. Higgs
Director, Planning and Policy W. A. McLean
THE FOLLOWING ITE~S WEP.E CONSIDERED:-
1) a) Proposed Salary Schedule for 1980;
b) Proposed Wage Schedules for 1980;
c) Salary Adjustments for 1980;
2) Employee Benefits - Leave of Absence due to Sickness;
3) Employee Benefits - Vacation Credits
4) Organization of the Finance Division;
~) Organization of Water Resource Division;
6) Organization of Information & Education Division;
7) Re-Classification - Conservation Land Hanagement Division;
S) 1980 Staff Management Seminar;
9) Certified Professional Secretary Standing - Executive Secretary;
10) Remuneration of the Chairman and Vice Chairman;
11) Christmas Holiday 1979;
12) Appointments. Transfers and/or Promotions to the Full Time and
Full Time Probationary Staff;
13) Members - Per Diem
IT WAS AGREED, AND THE SUB-COHMITTEE RECOMMENDS:-
1) a) THAT the 1980 classification level ranges together with the
guidelines for the use of the revised salary structure. attached
as Appendix 1. be approved effective January 1, 1980;
bl) THAT the 1980 Wage Schedule attached to this report as Appendices
2(a), 2(b) , 2(c) and 2(d) be approved;
b2) THAT the Secretary-Treasurer be requested to review the hourly
rated employees of Black Creek Pioneer Village, in conjunction
with the recommendation of Ueeting #5/79 of the Hanagement Study
Review Sub-Committee.
c) THAT the salary adjustment
of November 28. 1979. be approved.
B-424
Report #6/79 Page #2
Personnel Sub-Committee
2) EMPLOYEE BENEFITS - LEAVE OF ABSENCE DUE TO SICKNESS
.
THAT the staff report re: Employee Benefits - Leave of Absence
due to Sickness be received and attached to this report as
Appendix 3, and further
THAT the sick leave credit benefit plan be reviewed on the basis
of the total benefit package and the task be undertaken in conjunction
with the recommendation of Meeting #5/79 of the Management Study
Review Sub-Committee, and further
THAT the Secretary-Treasurer be directed to review with the
Ministry of ~atural Resources, Province of Ontario the funding
of vested accumulated sick leave.
3) Et~LOYEE BENEFITS - VACATION CREDITS
THAT the vacation credits appendixed as Appendix 4 be approved
effective January 1, 1980.
4) ORGANIZATION OF THE FINANCE DIVISION
THAT the organization chart for the Finance Division and the
terms of reference for the Supervisor, Budf,et Control and
Assistant Accountant appendixed as Appendix 5 be approved.
5) ORGANIZATION OF THE WATER RESOURCE DIVISION
THAT the organization chart for the Water Resource Division and
terms of reference for Project Engineer - Hydrology appendixed
as Appendix 6 be approved, and further
THAT the position Engineer - Regulation Control be deleted.
6) ORGANIZATION OF THE INFORHATION & EDUCATION DIVISION
THAT the organization chart for the Information and Education
Division and the terms of reference for the position of
Conservation Education Supervisor (Kortright) appendixed as
Appendix 7 be approved, and further
THAT a residence be provided on the same basis as the Conservation
Education Supervisors of the residential Conservation Field Centres,
and further
THAT the position Conservation Education Supervisor (Field Centres)
be amended to read Classification Level 7-A.
7) RE-CLASSIFICATION - CONSERVATION LAND MANAGEMENT DIVISION
THAT the classification of Conservation Services Technician,
Conservation Land Management Division, be re-classified to
classification Level 5, appendixed as Appendix 8.
8) 1980 STAFF HANAGEHENT SEHINAR
THAT the staff be authorized to organize a staff management seminar
at the Leslie Frost Resource Centre, February 28, 1980 to ~arch 2,
1980 and that the expenses in connection therewith be paid.
9) CERTIFIED PROFESSIONAL SECRETARY STANDING - EXECUTIVE SECRETARY
THAT Mrs. K. Conron, Executive Secretary, be authorized to take the
Certified Professional Secretary examination to be held at Ryerson
Polytechnical Institute, Toronto, in the spring of 1980, and further
THAT per application and examination fees, in the amount of $90.00,
be paid.
B-425
REPORT #6/79
Personnel Sub-Committee , Page '3
10) REMUNERATION OF THE CHAIR!IA.'i AND VICE CHAIRMAN
THAT the Authority make'application to the Ontario UunicipaI
Board for authorization to pay the Chairman $18,000.00 per annum
and the Vice Chairman $7,000.00 per annum effective January I, 1980.
11) CHRISTMAS HOLIDAY 1979
THAT all full-time, full-time probationary, seasonal and contract
employees be granted a leave of absence with pay on Monday,
December 24, 1979, and further
THAT all full-time, full-time probationary, seasonal and contract
employees required to maintain essential services on Monday,
December 24, 1979 be given a one day's leave of absence with pay
in lieu of.
12) APPOINT~mNTS, TRANSFERS, AND/OR PROHOTIONS TO THE FULL TIME
AND FULL TIHE PROBATIONARY STAFF
THAT the appointments, transfers and/or promotions to the full
time and full time probationary staff apperidixed as Appendix 9
be approved.
13) MEMBERS - PER DIEM
THAT the Authority make application to the Ontario Uunicipal
Board for authorization to pay members per diem in the amount
of $45.00, effective January 1, 1980.
B-42;
APPENDIX 1 (a
~ the metropolitan toronto and region conservation authority PAGE: C-7
Personnel I,lanual EXEOJTIVE N!
(!7 Employee Classifications and Categories DATE:
Guidelines re Salary Structure RESOWTION N2
1) Low-Mid-High points are established each year.
2) A standard increase, based on the cost of living, avail-
abili,ty of funds etc, . will be applied as a percentage
to all low-mid-high points in all classification levels.
3) All employees will be given this standard increase as a
percentage of their existing salary except the maximum
standard increase any employee can receive will be the
applicable amount the high point for the level is being
increased. This will only affect employees earning in
excess of the high pOint in their classification level.
4) SUbject once again to the availability of funds, a merit
increase will be established for each level based on a
percentage of the mid point in each level.
5) Uerit increases will only be given up to the maximum for
each classification level and under no circumstances will
any merit increase be given which causes the salary of the
employee to exceed the high point for the classification
level.
.
~-4 2 7
AI'I'ENIII X 1 (b)
.. c& the metropolitan toronto and region conservation authority PAGE: C-8
Personnel Manual EXEaJTlVE N!
(?7 Employee Classifications and Categories DATE:
1980 Level Ranges RESOWTION N!
1980
~ Low Mid High Merit
1 - - - -
2 8,640 10,260 11,880 410
3 10,800 12,690 14,580 508
.
4 12,960 15,120 17,280 605
5 15,660 17,820 19,980 535
6 18,360 20,790 23,220 624
7 21,600 24,030 26,460 721
8 24,840 27,540 30,240 826
9 28,080 31,320 34,560 626
10 32,400 35,640 38,880 713
11 37,800 41,040 44,280 821
12 43,200 46,440 49,680 929
B-428
APPENDIX Ua)
TO: The Personnel Sub_Committee, M.T.R.C.A. - Meeting "6/79
Wednesday, November 28, 1979
FROM: R. K. Cooper, Administrator, Historical Sites Division
RE: 1980 Hourly Rated Employees - Black Creek Pioneer Village
In 1980, we are attempting to broadly categorize hourly employees at the
Black Creek Pioneer Village.
Comparison of the 1979 multi-level rate to the proposed 1980 levels indicates
an 8.2\ increase at the lowest level.
1979 1980 (proposed)
$3.05 - $3.90
$4.00 - $4.80
$4.90 - $5.70
$5.80 - $6.55
$6.65 - $7.45
$7.55 - $8.30
$8.40
Interpreters $3.30 - $6.00
Artisans $4.30 - $7.50
Labourers $3.30 - $6.00
Trades Person $4.30 - $8.50
RECOMMENDATION:-
IT IS THEREFORE RECOMMENDED THAT the above proposed 1980 Hourly Rated Employees -
Black Creek Pioneer Village - be approved and incorporated into the 1980
Authority Wage Schedule.
:jh
1979.11.21
B-429
APPENDIX 2(b)
.-..-...
TO: The Personnel Sub-Committe, M.T.R.C.A. - Meeting '6/79
Wednesday, November 28, 1979
FROM: W. A. McLean, Director, Planning & Policy
RE: 1980 Hourly Wage Rate - Students & Part Time Employees
Staff have had several meetings in order to arrange a standard table of wage
rates for students and part time employees.
The proposed increase in 1980 for the inexperienced level ranges from 8.5\
to 11.8\ while the rate for the experienced level ranges from 7.9\ to 17.1\.
In both cases, the highest increase is in the Lifeguards - Guard category.
The proposed increase in 1980 for the Technician group ranges from 8.9\ to
10.1\.
1980 HOURLY WAGE RATES - STUDENTS & PART TIME EMPLOYEES
Function Inexperienced Experienced
1979 1980 1979 1980
Actual Proposed Actual Proposed
Lifeguards - Head $4.45 $4.90 $4.75 $5.20
- Assistant Head $3.80 $4.25 $4.15 $4.55
- Guard $3.20 $3.80 $3.50 $4.10
Gateman $4.45 $4.90 $4.75 $5.20
Attendant $3.50 $3.80 $3.80 $4.10
Labourer $4.45 $4.90 $4.75 $5.20
Technician (Post-Secondary)
1979 1980
Actual Proposed
- First Year $4.45 $4.90
- Second Year $4.75 $5.20
- Third Year $5.05 $5.50
RECOMMENDATION
IT IS THEREFORE RECOMMENDED THAT the above proposed 1980 Hourly Wage Rates -
Students and Part Time Employees - be approved and incorporated into the
1980 Authority Wage Schedule.
:jh
1979.11.06
B-430
~IHX 2(c'
TO: The Personnel Sub-Committee, M.T.R.C.A. - Meeting '6/79
Wednesday, November 28, 1979
FROM: W. A. McLean, Director, Planning & Policy
RE: 1980 Hourly Wage Rates - Full Time and Seasonal Staff
Cons. Land Management 1979 Actual 1980 Proposed
& Information & Education Water Resource Wage Scale Wage Scale
Labourer Labourer $5.70 - $6.30 $6.25 - $7.00
Lead Hand Lead Hand $6.30 - $7.00 $6.95 - $7.75
Semi-Skilled Labour
Assistant Superintendent Assistant Work Supt. $6.60 - $7.30 $7.25 - $8.10
Skilled Labour Maintenance Inspector
Nursery Supervisor $7.65 - $8.55
Foreman Works Superintendent $7.30 - $8.25 $8.05 - $9.15
Foreman-Skilled $9.15 - $10.35
The proposed increase in 1980 ranges from 9.6\ to 10.3\ at the bottom level of the
scale and ranges from 10.7\ to 11.1\ at the top level of the scale.
RECOt+1ENDATION
IT IS THEREFORE RECOMMENDED THAT the 1980 Hourly Wage Rates as shown above for -
Full Time and Seasonal Staff - be approved and incorporated into the 1980 Wage
Schedule.
:jh
1979.11.19
B-431
AP?ENDIX 2(d)
.
TO: The Chairman and Members of the Personna 1 Sub-Committee, M.T.R.C.A.
Meeting '6/79 - Wednesday, November 28, 1979
FROM: T. E. Barber, Administrator, Information &, Education Division
HE: 1980 Day Rates - .Information and Education Division
1979 1980
Present Rate Proposed Rate
Educational Assistant - Level I $22.00/day $25.00/day
(Seasonal & Part Tlme
Education Staff - Level II $29.00/day. $32.00/day
Black Creek Pioneer
Village, Conservation - Level III $34.00/day $37.00/day
Field Centres,
Kortright Centre for - Level IV $39.00/day $42.00/day
Conservation and
other Proj ects) - Level V $44.00/day $47.00/day
Education Specialist $50.00 - $110.00 $50.00 - $125.00
per day per day
The proposed-increase in 1980 ranges from 6.8\ in Level 5 to 10.3\ in Level 2.
RECOMMENDATION
IT IS THEREFORE RECOMMENDED THAT the day rates for Educational Assistants,
Levels I-V and Educational Specialists as outlined above for 1980, be approved
and incorporated into the 1980 Authority Wage Schedule.
:jh
1979. 11. 06
B-432
APPENDIX 3
TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A.
Meeting '6/79 - Wednesday, November 28, 1979
FROM: G. Dudar, Administrator, Finance Division
RE: Employee Benefits - Leave ~f Absence due to Sickness
In reply to the Personnel Sub-Committee's request at Meeting '3/79,
"That the staff review the Authority policy having regard to
Employee Benefits -Sickness credits as per Authority Resolution
'53 including the financing of the liability and report to the
Executive Committee."
The staff is pleased to submit the following report.
The staff has attempted to address itself to two major questions:-
a. Whether the present sick leave credits as a short term disability
plan provides an employer sensitive shield for all our employees
against major financial hardships resulting from absences due to
illnesses which does not qualify under the existing Long Term
Disability Plan.
b. An unfunded liability which has been growing each year and could
cause a financial hardship to the Authority if large payouts were
required at any point of time.
PRESENT SALARY CONTINUATION PLANS AT M.T.R.C.A.
1. Sick Leave Credits: Sick leave credits accumulate at the rate of l~ days
per full calendar month in the employ of the Authority.
Up until January 1, 1978, this applied to Full Time and Temporary employees.
tffective January I, 1978, when categories of employees were changed,
accumulation of SIck leave credits applied to Full Time Employees only.
2. Sick Leave Pay-Out
a. All Employees appointed to Temporary or Full Time staff prior to
January 1, 1976, who have completed two years continuous service, are
entitled to a payout upon termination for any reason.
The payout is 50% of the employees accumulated sick credits up to a
maximum of six months salary.
b. All Employees appointed to Temporary or Full Time staff after
January 1, 1976, who have completed five years continuous service
on the Temporary or Full Time staff, are entitled to a payout as
follows: -
i. Upon retirement - 50% of the employees accumulated sick credits
up to a maximum of six months salary.
1i. Upon termination for reasons other than retirement - 50\ of the
employees accumulated sick credits up to a maximum of three
months salary,
MINIMUM TIME FRAME FOR MAXI~ruM PAY OUT under 2(b) above
Employment Maximum # of Sick Maximum Pay Out
Period Day Earnings Termination Retirement
up to 5 years nil nil
5 years 90 days 45 days 45 days
~years 180 days 63 days 90 days
15 years 270 days 63 days 126 days
20 years 360 days 63 days 126 days
B-433
3. Long Term Disability: All employees appointed to the Full Time staff are
eligible for Long Term Disability benefits under an Insurance plan for
which the Authority pays 100%.
Under this plan, an employee who:-
a. has been employed on the Full Time Staff for a minimum of three months;
b. has been continuously disabled for a period of three months;
c. has presented satisfactory medical evidence; and
d. is under the age of 65,
is eligible to receive a combined disability income, from all sources, to a
maximum of 75% of the employee'S usual monthly income with a minimum of 60\
being paid by the Long Term Disability Insurance Plan.
NOTE: The maximum payment by the Long Term Disability Insurance Plan is
$12,000. per annum (based on 60% of a maximum salary of $20,000.00).
Any accumulated sick pay credits are paid to any employee, in accordance with
approved Sick Leave Pay Out policies, at such times as the employee is
transferred to the Long Term Disability Insurance Plan.
The current premium for Long Term Disability Insurance is $1.34 per $100.00
of salary up to a maximum salary of $20,000.00.
BENEFIT
Cost of Present Sickness Credits Plan
1. Pay out:- 1977 - $42,000.
1978 - $ 8,400.
1979 - $20,000. (budget)
2. Cost and Trends of Paid Sick Leave
It is estimated that such costs amounted to at least $40,000. in 1978.
A review of paid sick leave during 1978 indicates that, on the average,
the following occured:-
a. 3.9 days of paid sick leave was taken by all employees;
b. 17\ of the employees who took sick days, have taken ten (10) or
more paid sick days during the year;
c} Of the 17% of the employees, 67% had single illnesses lasting more
than five (5) days which is estimated to have cost the Authority
about $10,000;
d. 29\ of our full time staff have not taken sick days; and
e. A review of these costs and trends appear to lead to two conclusions:-
1) The present system of self-administrating the paid sick leave for
other than occasional sickness is cost effective.
2) The 3.9 days of paid sick leave taken on average, combined with the
high average, representing sickness occurences exceeding each more
than five (5) working days and the low percentage of employees who
had taken ten (10) or more paid sick days during the year versus
our allowed of eighteen (18) days would appear to indicate that
our employees are not abusing the system and that the reward for
not abusing the system is a well appreciated incentive program.
3. Future Costs: According to the audited financial statements, the unfunded
liabilities for sick leave have risen by 44% in 4 years to a level of
$483,000. at December 31, 1978 as compared to the balance of $335,000.
at December 3], 1974.
B-434
It is interesting to note that in 1975 the growth was 20\ while for 1976,
1977, and 1978 the growth was only 5.7%. 9.9\, and 3.4\ respectively.
January I, 1976 was the date on which the payout entitlement was changed
from two years of continuous service to five (5) years and that upon
termination (as opposed to retirement) the maximum payout was changed
from a maximum of six (n) months to three (3) months.
WHAT OTHERS ARE DOING
l. Participating Regional Municipalities
a. Sick Leave Credits: Durham, York and Metro Toronto provide for the
accumulation of l~ days per month with no further coverage for Short
Term Disability.
Peel amended their plan in 1975 and provided both a non-cumulative
occasional sick day plan administered by each supervisor and a Peel
administered Short Term Disability Plan commencing on the fourth day
retroactive to the first day with a coverage of 100% for the first
two weeks and two-thirds thereafter to a total coverage of 15 weeks at
which time a Long Term Disability plan comes into effect.
b. Sick Leave Pay Out:
York - after 6 months - 50\ - maximum 6 months
Durham - after 5 years - 50\ - maximum 6 months
Metro Toronto - after 10 years - - maximum 3 months
after 15 years - - maximum 4 months
after 20 years - - maximum 5 months
after 25 years - - maximum 6 months
Peel - Upon the discontinuation of Sick Leave Plan, Peel
offered to payout the accumulated sick leave over
time which averaged four years. The payout per-
centage was dependent on length of service within
a government with a maximum of 50\ and up to a limit
of 180 days.
2. The Province discontinued the accumulating Sick Leave Benefit Program on
April, 1978 and replaced it with a Short Term Disability Plan providing 100\
salary for the first six (6) days and 75% salary for the next 124 working
days with an option of 100% salary for the 124 days ,with the off-setting
reduction in vested accumulated sick leave.
The payout of the accumulated sick leave is limited/to half the annual
salary and is made on termination. Employees were also provided with a new
severance pay scheme encompassing serV1ce years prior to April I, 1978 and
subsequent years at a rate of one (1) week per year payable on termination
to those employees who have completed at least one (1) year of continuous
service and are terminated due to retirement, lay-off, death or resgination
due to disability.
3. Industry - 80% of the private sector for management and office functions
have opted for self-administered salary continuation plans not based on
sick day credit accumulations, with the following reimbursement levels:
REIMBURSEMENTS % of TOTAL
100\ 46.3
60\ to 75\ 5.7
Dependent on length
of service 30.0
Other Variables 18.0
100.0
B-435
CONCULSION ON BENEFITS
The M.T.R.C.A. Sick Leave Credit Accumulation Plan does not provide a
Short Term Disability Plan to 311 it~ Full Time empJc~pes.
The present plan' could create a financial hardship to a long term dedicated
employee except for the ad hoc intervention of the Executive at certain
times. Similarly, new full time employees are not effectively covered.
In addition, the Staff is substantially less than adequately covered under
the Long Term Disability Plan.
FUNDING OF SICK LEAVE CREDITS
At the present time, the cash accounting basis for the payments of grants by
the Ministry of Natural Resources preclude the ~I.T.R.C.A. from recognizing, on
a year-to-year basis the increase in vested sick leave. Each year the
M.T.R.C.A., during its budget process, includes in its Administration budget
the vested sick leave credits for those who are retiring, and an estimate is
made for terminations. However, only actual payments are claimed from the
Ministry of Natural Resources.
The problem of unfunded liabilities for vested sick leave has been recognized
by the Ministry of Intergovernmental Affairs as it applies to Municipalities.
In July 1979, this Ministry issued preliminary recommendations which, in
general, reflect a freeze in the amount of unfunded vested sick leave to
the 1978 balance with any increase in vesting reflected as a reserve or
reserve fund. In addition they have recommended that a reserve or reserve
fund for 50% of past service committments as at December 31, 1978 be
established and amortized over a number of years and the municipalities
develop a long term policy which would eventually accumulate a 100\ provision
of the outstanding past service accumulation.
The M.T.R.C.A. has the authority to payout the existing vested sick leave,
and discontinue the existing sick leave credit benefit plan. However the
questiun is whether the Ministry of Natural Resources will fund their portion
of any payout formula developed by M.T.R.C.A.
Similarly the establishment of a reserve or reserve fund on any reasonable
basis is predicted on the WIllingness of the Ministry of Natural Resources
to fund on a basis other than actual payments. It is understood that the
Ministry of Natural Resources, in the past, has not agreed to the Reserve
concept for grant purposes.
SUGGESTED DIRECTIONS
1. Funding: Since the problem is probably Province wide in nature, the
medium of the Chairman's Committee could initially be used to approach the
Ministry of Natural Resources in developing a solution where funding for
a reserve would be provided.
2. Benefits: Staff believes that the financial resources allocated to benefits
should be directed in the following areas:-
a. To the provision of a Short Term Disability Plan for all our Full Time
employees and that the period of coverage be provided until the Long
Term Disability Plan takes effect and that such plan continue to be
self administered.
b. That the level of coverage on the Long Term Disability Plan be increased
to reflect the financial needs of staff at times of Long Term Disability.
c. That a separate plan for occasional sickneSs be developed and that such
plan retain the feature of accumulation and short term payout.
d. Present employees of the M.T.R.C.A. have joined the Authority on a basis
of an existing benefit plan which provides a substantial financial
benefit. Consequently, changes to the level of accumulation should be
offset with another benefit program. Consideration could be given to a
dental plan which would round out the M,T.R.C.A, benefit plan and bring
it in line with other organizations of similar size.
B-436
3. In Conclusion: The Staff believes that the Sick Leave Credit benefit plan
should be reviewed on the basis of the total benefit package and the task
undertaken in conjunction with the recommendation in Meeting #5/79 of the
Management Study Review Sub-Committee that:
"The Secretary-Treasurer be directed to review the manner in
which the Authority remunerates ,all of its staff, inclusive of
fringe benefits and to make recommendations as required for
revision to the compensation plan."
:jh
1979.11.21
:=437
APPENDIX 4
<& the metropolitan torohto and rcg'.m conservation authority PACE' E-13
Personnel Manual EXEOJTIVE N!
(?7 Employee Benefits DATE:
,
Vacation Credits RESOLUTION N!
1) Vacation credits accumulate as fol10ws:-
. Up to one year of service - 1 day for each full month
. 2 to 5 years of service - l~ days for each full month
. 6 to 14 years of service - 1% days for each full month
. 15 to 19 years of service - 1 3/4 days for each full month
. 20 years and over - 2 days for each full month
2) Employees shall be allowed to accumulate up to a maximum of the
vacation credits earned in anyone year and shall only exceed
this maximuc with the approval of the Secretary-Treasurer.
3) Vacation credits shall be calculated from the individuals
anniversary date and shall be based on each full month of
service.
FINANCE DIVISION
Administrator
of Finance
(C. L. 10)
Senior Secretary (C.L. 4)
Supervisor Supervisor Supervisor
Accounting Personnel Budget Control
Services Services (C. L. 6)
(C. L. 7) (C.L. 5)
I I I I I
lssistant Accounting Accounting Accounting Accounting
lccountant Assistant Assistant Assistant Assistant
:C.L. 4) (Claims & (Payables) (General) (Payroll)
Invoicing) (C. L. 3) (C.L. 3) (C.L. 2)
(C. L. 3)
>
""
""
m
z
c
....
><
CJ1
-
lD
-
tI'
I
..
w
;~439
APPENDIX 5 (b)
UlVISION: Finance rAl:n: K-6
roS"'IO~ : Supervisor, Budget Control UJ:CUTJVI; ,
DATE:
CL^SS. LI:V!:L: 6 RESOLUTION .
TERMS OF REFERENCE
To be responsible to the Administrator of Finance for:-
- co-ordination of preparation of all annual and multi-year
budgets
- development of budget procedures and budget control
procedures
- co-ordinating any budget revisions through the necessary
procedures
- analysis of cause and effect of budget revisions on the
annual budget
- monthly report and analysis of monthly financial statement
and variances with budgets
- analysis of Divisional quarterly reports and projected
year-end results
- the performance of other related duties as assigned.
.
QUALIFICATIONS & EXPERIENCE
.!
- 'a thorough knowledge of accounting principles and practices
- an ability to work effectively with other persons
- proven analytical ability
B-44
APPENDIX 5 (c)
IJIVISlmJ: Fi~ance rAm! : K-8
I'OSIT IO~: Assistant Accountant I!XHCUn VI; ,
- MTli:
ClASS. LEVU: 4 IU!SOLUTI ON "
TERMS OF REFERENCE_
- assist Supervisor of Accounting Services with preparation
of financial statements
- assist in preparation of vehicle and equipment records per-
taining to acquisition, usage and depreciation
- reconciliation of accounts receivable and accounts payable
- analysis of suspense accounts and others as required
- operation of Authority's nechanized accounting system
- assist in scheduling machine time on Authority's accounting
system
- performance of other related duties as assigned by the
Supervisor, Accounting Services
QUALIFICATIONS & EXPERIENCE
- a sound under~tanJLng of ac~ounting principles and practices
- experience on mechanized accounting system
- an ability to work effectively with other person~
.
"
III
,e.
,e.
~
WATER RESOURCE DIVISION
Administrator,
\"at er Resource
Division
(C.L. 10)
Senior Secretary (C.L. 4)
Head, Project Project Head,
Flood Control Planner Biologist Waterfront
Section (C.L. 7) (C.L. 7) Section
(C.L. 8) (C.L. 8)
)raft ing (C. L. 4) I Secretary (C.L. 3) Drafting (C.L. 4) I Secretary (C.L. 3)
I I
Project Project Maintenance Project
Engineer & Operations Engineer
Development Engineer - Supervisor Development
(C.L. 7) Hydrology (C.L. 6) (C.L. 7)
I (C. L. 7) I
Development >
Technician I I "C
"'0
(C.L. S) m
Dam Operators Engineer, Development Landfill z
c::;
(C.L. SA) Shoreline Supervisor Supervisor -
><
Management (C.L. 6) (C.L. 6) C\
(C . L. 6 ) '"
Assistant !l)
Development '-"
Technician Biological
(C. L. 4) Techn ician
(C.L. 4)
B-442
- _APPENDIX 6(b)
IUVISION: WATER RESOURCE rM:t:: P-ll
..------ ---- - --------
''05 J1 ION: PROJECT ENGINEER- HYDROLOGY um:u rJ VI: .
MH:
CV.SS. LEV 1:1.: 7 RJ:SULUTI ON .
TERMS OF REFERENCE
Responsible to the Head of the Section and to take responsibility for:
- the development and operation of the Authority's Flood Warning
System
- the development and operation of the Authority's Hydrologic and
computer models for the provision of technical information to
Authority staff and other agencies, developers, and municipalities
- the provision of technical assistance to the Authority's planning
and development control staff relat~ng to the Authority's
regulations
- liason with municipal and provincial staff in the development of
the Authority's flood warning and forecasting system
- the assisting of liason and co-ordination with contractors and
consultants carryinq out Authority projects necessary for the
administration of the Authority's regulations such as mapping,
computer modeling, hydrologic studies
- assist in the preparation of tenders, quotations and specifications
for materials, studies, mapping, equipment required for the
administration of the Authority's regulations and flood warning
system .
- performance of other related duties as required.
:
QUALIFICATIONS & EXPERIENCE
- knowledge of the principles and practices of civil engineering
design and methods
- good knowledge of hydrology and meteorology
- working knowledge of various hydrologic and hydraulic computer
models
- knowledge of planning process relating to subdivision control
- ability to work closely with staff of other Authority Divisions
Government Agenc~es, private developers, and general public
- eligible for membership in the Association of Professional
Engineers of the Province of Ontario
-,
at
I
.c.
INFO~~TION & EDUCATION DIVISION .c.
w
Administrator
Information 5 Education
(C.L. 10)
Senior Secretary (C.L. 4)
Head. Conservation Head, Conservation
Information Section Education Section
(C. L. 8) (C.L. 8)
I
I I
Secretary (C.L. 3) Cons. Ed. Supervisor(s) Cons. Ed. Supervisor Program
Cons. Field Centres Kortright Centre for Co-Ordinator
(C.L. 7A) Conservation (C.L. 7A) B.C.P.V.
Conservation I
Infonnation
Co-Ordinator Secretary Educational
(C. L. 5) (C.L. 3) Assistants
I I
Project Clerk Curator Superintendent
Technician Co-Ordinator(s) (C.L. 2) (C.L. 7A) (C. L. SA)
(C. L. 2) (C. L. 6) , I
I , , I
Exhibit Program Building Lead Hand
Instructor(s) Designer Co-Ordinator Manager II (C.L. 4)
(C.L. 4 & 5) (C.L. 5) (C.L. 5) (C.L. S) J
I I I
Residential Part Time Educational L Labourers
Assistant (s) Staff Assistants >
~
(C. L. 3A) ~
z
I c
-
><
Building --.J
~Ianager(s) ,....
p)
(C. L. 4) .......
I
Educational
Assistants
B-44
. APPENDIX 7 (b)
DIVISION: Information and Education PAGE:
POSITION: Conservation Education Supervisor EXECUTIVE ,
(Kortright Centre for Conservation) DATE:
CLASS. LEVEL: 7A RESOLUTION ,
TERMS OF REFERENCE:
To take responsibility for:
- the management and operation of the Kortright Centre
- public relations, promotion and marketing
- engaging and training staff
- developing and coordinating long and short-term work
schedules to carry out operations and maintenance,
development and research
- researching and developing a merchandise sales outlet
- researching and developing a food service related to
the program
- developing special group use markets
- preparing budgets and setting priorities and monthly
analyses
- providing product reports
- developing policy recommendations to guide the
operations and development of the Centre
- assisting the Foundation and Senior Authority Officials
in seeking support for the Centre
- identifying the need for and the role of volunteers -
individuals, groups, associations and members of. the
Kortright Centre for Conservation
- the performance of other related duties as assigned
OUALIFICATIONS AND EXPERIENCE
- proven management ability
- experience in teaching and/or conservation, preferably
both
- able to maintain budget control
- ability to work effectively with others in related and
unrelated disciplines
- fondness for outdoor life and natural sciences
- background in public relations, promotion and
marketing
B-445
APPENDIX 7 (C)
DIVISION: Information and Education PAGE: M-6
POSITION: Conservation Education Supervisor EXECUTIVE,12/79
(Field Centres) DATE: Aug. 15/79
CLASS. LEVEL: 7A RESOLUTION' 317
TERMS OF REFERENCE
To take responsibility for:-
_ the operation of one or more conservation education projects
and for instruction as required by the approved Authority
program
_ the instruction of all visiting students, including school
classes, adult groups, various youth groups and Conservation
area visitors
_ the counselling and preparing reports on student teachers
_ the supervision and delegation of duties to those staff
members which may be assigned by the Authority to the project
or proj ects
_ assisting the Administrator of the Information and Education
Division in preparing budget estimates
_ the pre-planning of teachers and classes, student teachers
and other groups in preparation of their attendance at
the project
_ the descipline of students with the assistance and co-operation
of the visiting teacher or group leader
_ the development of all programs related to the pro}ect, as
may be determined by the Authority policy
_ the performance of other related duties as assigned
QUALIFICATIONS & EXPERIENCE
_ experience in teaching or conservation, preferably both
_ an ability to teach out-of-doors and in the laboratory
_ an ability to present the Authority program to adult
groups and educational personnel
_ an ability to work effectively with other persons in related
and unrelated disciplines'
COOSERlJATICN U\ND MANAGE11ENT DIVISICN
Administra tor,
Conservation Land
Management Division
(C.L. 10)
Senior Secretary (C.L. 4)
Superintendent Supervisor of Planner
of Operations Conservation (C.L. 6)
(C.L. 7) Services
(C.L. 6)
Administrative Safety Officer Technician
Assistant (C.L. 5) Planning
(C.L. 4) (C.L. 5)
Conservation
Services
Technician
Regional Regional (C.L. 5) Draftsnan
Superintendent(s) Superintendent (s) (C.L. 4)
(C.L. 6) Cen tral Services
(C.L. 6)
I
Conservation Area Stockroom >
Superintendent(s) Manager -0
-0
(C.L. 5 & SA) (C.L. 4) en
z
c
....
><
00
-.
p:l
.....,
tJJ
I
..
..
0\
B-447
-- - 4P.PENDIX 8 (b)
IIIV'S'ON: Conservation Land t1anagement r AC:J; : 0-12
-- - ----
l'OS'nON: I!UCU rJ VI: 4 19/78
Con~ervation ~rvices Technician
PAl';: Dec. 6/78
CLASS. LEVU. : 5 RESOLUTION' 495
TERMS OF REFERENCE
To take responsibility for:
- co-ordinate field studies related to Conservation Land Management
programs and Private Land Assistance programs;
- co-ordinate Land Use Planning programs;
- prepare detailed plans related to Conservation Services section~
- co-ordinate pond serv~ces program:
- prepare technical reports and maintain records:
- carry out site visits related to Private Land Assistance Programs;
- report to Supervisor of Conservation Services:
- preparation of tenders for material and equipment.
OUALIFICATIONS AND EXPERIENCE
- a knowledge of conservation practices related to Conservation Land
Management Programs and Private Land Assistance Programs;
- an abiliry to wor~ eff~~tively with other persons in related and
unrelated disciplines:
- an abili ty in landscape des~gn;
- an ability to deal with the public in a knowledgeable:and courteous
manner.
APPENDIX 9 B-44 8
TO: The Chairman and Members of the Personnel Sub-Committe, M.T.R.C.A.
Meeting #6/79 - Wednesday, November' 28, 1979
FROM: G. Dudar, Administrator, Finance Division
RE: Appointments, Transfers and/or Promotions to the Full Time and Full Time
Probationary Staff
IT IS RECOMMENDED THAT the following appointments, transfers and/or promotions be made
to the Full Time and Full Time Probationary Staff:-
1) APPOINTMENTS TO THE FULL TIME PROBATIONARY STAFF
Name Position Level Effective Ik,te
J. Harnadek Senior Secretary 4 November 5, 1979
L. J. Barkey Secretary 3 October 3, 1979
L. M. Dillon Workroom Assistant 3 October 9, 1979
J. I. Lauritzen Secretary 3 November 19, 1979
R. Locke Accounting Assistant 3 November 12, 1979
2) APPOINTMENTS TO THE FULL TIME STAFF
Name Position Level Effective Date
N. Cowey Project Engineer 6 September 26, 1979
K. Snowden Biological Technician 4 November 22, 1979
M. C. Piper Planning Technician 6 November 22, 1979
R. Hudson Conservation Education
Supervisor 7A September 1, 1979
A. Patterson Residential Assistant 3A September 1, 1979
I. Ferguson Building Manager 4 September 2, 1979
C. Hayden Foundation Senior
Secretary 4 January 1, 1980
L, J. Barkey Secretary 3 January 1, 1980
L. M. Dillon Wurkl'oOlll AS::..i.stdlll 3 January 1, 1980
R. Brooks Labourer November 25, 1979
P. Good Labourer November 25, 1979
M, Tyrre 11 Tradesperson November 25; 1979
3) TRANSFERS AND/OR PRO~IOTIONS WITHIN THE FULL TIME STAFF
Name Position Level Effective Date
J. Beedham Foreman Ski 11 ed - October 14, 1979
J. Silk Workroom Assistant 3 June 11, 1979
J. Silk Receptionist 3 October IS, 1979
M. Miller Assistant Accountant 4 October 14, 1979
M. Yates Accounting Assistant 3 October 14, 1979
P. George Co-Ordinator,
Work Room 3 January I, 1979
G. Kidd Superintendent SA October 28, 1979
R. Gilchrist Assistant Superintendent- October 28, 1979
H. McIntosh Assistant Superintendent- October 28, 1979
D. Whelan Lead HUJ'd - October 28, 1979
R F. Baxter Lead Hand - October 28, 1979
G. Misumi Skilled Labour - January I, 1980
G. Wilkins Skilled Labour - January 1, 1980
A. J. Lamers Nursery Supervisor - January 1, 1980
F. Casey Foreman - January 1, 1980
A. Vernest Foreman - Skilled - January 1, 1980
M. Hesp Registrar 4 January 1, 1980
D. Harris Artisan - January 1, 1980
~ B-449
,
the metropolitan toronto and region conservation authority
minutes Report 119/79
EXECUTIVE COMMITTEE WEDNESDAY-DECEMBER-19-l979 119/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, December 20, 1979, commencing at 10:00 a.m.
PRESENT WERE
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gell
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Finance Division G. Dudar
Adm. - Conservation Land Management Division P.B. Flood.
Adm. - Water Resource Division M.R. Garrett
Research Plannt:r, Planning & Pulicy Mrs. A.C. Deans
Development Coordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
Supervisor, Property Administration, P&AD D.J. Prince
MINUTES
The Minutes of Meeting #18/79 were presented.
Res. isi6 Moved by: C.F. Kline
Seconded by: E.V. Kolb
RESOLVED THAT: The Minutes of Meeting #18/79, as presented, be adopted as if read.
CARRIED:
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY.
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
l. THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION
-Advance of funds to The Metropolitan Toronto ,and Region
Conservation Authority
On behalf of The Metropolitan Toronto and Region Conservation Foundation, Mr.
Card presented a cheque in the amount of $100,000.00 to Mr. R.G. Henderson,
Chairman of the Authority. The cheque represents an advance to the Authority
for the obligations of the Foundation in 1979.
B-450 -2-
Res. 1517 Moved by: Mrs. J.A. Gardner
Seconded by: E.V. Kolb
RESOLVED THAT: The Chairman and Members of The Metropolitan Toronto and Region
Conservation Foundation be thanked for the advance in the amount of
$100,000.00; and
THAT the Authority acknowledge the continued support of the Foundation in the
advancement of conservation projects in the Metropolitan Toronto region.
CARRIED;
2. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. & Mrs. J. Jenkins
To construct a gabion wall and reshape lands at rear of
'9 Lakeshore Drive, Borough of Etobicoke (Waterfront)
This item was withdrawn.
3. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Runnymede Development Corporation Limited
To construct a parking lot on Lot 1, Concession 1, S.D.S.,
City of Mississauga (Etobicoke Creek Watershed)
A staff communication was presented advising that an application has been
received from Runnymede Development Corporation Limited for permission to
construct a parking lot at the above location.
Res. #518 Moved by: Mrs. F. Gell
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Runnymede Development Corporation Limited, be received; and
THAT the application of Runnymede Development Corporation Limited for
permission to construct a parking lot in an area as defined on the Schedules
appended to Ontario ReguJation 735/73, and on the flood plain of the Etobicoke
Creek as defined by the Regional Storm, in Lot 1, Concession 1, S. D.S., City
of Mississauga (Etobicoke Creek watershed), be approved, subject to:
(a) No additional fill being introduced into the subject area, with the
exception of topsoil;
(b) Any fill in the area which is to be used for the parking area being
removed and replaced with the exact amount of gravel and asphalt~
(c) An 8-inch concrete curb barrier being installed along the outer
perimeter of the parking area;
(d) The appropriate number of trees and shrubs being planted along the
common boundary line between the parking area and the valley;
(e) The landscaping plans being subject to a detailed plan which shall
indicate the size and location of all trees and shrubs;
( f) The Authority reviewing and approving the storm drainage plans for
the site ~
(g) No earth berms of any kind being created across and/or parallel to
the valley flood plain;
:(h) The valley lands between the proposed pa~king area and the river
being landscaped to the satisfaction of the Authority;
(i) The final limit between the Open Space zone and the site development
being determined by the Authority in conjunction with the City of
Mississauga.
CARRIED;
-3- B-451
4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Sheridan Chevrolet-Oldsmobile Limited
To construct a building and associated parking lot on
Part Lot 18, Concession 1 (#1800 Kingston Road) , Town
of Pickering (Duffin Creek Watershed)
A staff communication was presented 'advising that an application has been
received from Sheridan Chevrolet-Oldsmobile Limited for permission to con-
struct a concrete block service building and associated parking at the above
location.
Res. #519 Moved by: C. F. Kline
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The staff communication, together with.the application of
Sheridan Chevrolet-Oldsmobile Limited, be received; and
THAT the application of Sheridan Chevrolet-Oldsmobile Limited for permission
to construct a building and associated parking lot on Part of Lot 18,
Concession 1, also known as #1800 Kingston Road, in the Town of Pickering
(Duffin Creek Watershed), be approved, subject to:
.All work being completed in accordance with the Landscape Plan,
Drawing No. L-l, Project No. 79-52, as prepared by Landscape
Planning Limited, which forms part of the permit.
CARRIED,
5. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. Walter Vincent
To construct two dwellings and place fill on Lot 30,
Concession 1 (1148 John Street) , Town of Markham
(Don River Watershed)
A staff communication was presented advising that an application has been
received from Mr. Walter Vincent for permission to construct two dwellings and
place fill at the above location.
Res. 1520 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOL VED THAT: The staff communication, together with the application of Mr.
Walter Vincent, be received; and
THAT the application of Mr. Walter Vincent for permission to construct two
dwellings and to place fill in the area regulated in accordance with Ontario
Regulation 735/73, on Lot 30, Concession 1, known as '148 John Street, Town
of Markham (Don River watershed) , be approved, subject to:
(a) All filling and grading being undertaken in accordance with
Drawing No. 620-301, dated October 19, 1979, and prepared by
R.R. Higgins & Associates Limited~
(b) Section B-B on the plan submitted being amended so that the
newly-created side slopes shall have a 3 horizontal to 1
vertical slope~
(c) All filling taking place within the property limits, as
indicated on the plan submitted~
(d) All disturbed areas being sodded upon completion of the proposed
dwellings;
(e) A snow fence being erected across the common lot line between the
two residential lots and the park land;
( f) Every effort being made to minimize silting of the river during
construction;
(g) All works being completed to the satisfaction of the Authority and
of the Town of Markham.
CARRIED;
B-452 -4-
6. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Town of Caledon
To install temporary Bailey bridge on Sixth Concession
Road, Lot 12, Concession 5, former Township of Albion,
Town of Caledon (Humber River Watershed)
A ,staff communication was presented advising that an application has been
received from the Town of Caledon for permission to undertake the above-
noted proposal.
Res. #521 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of the
Town of Caledon, be received; and
THAT the application of the Town of Caledon for permission to install a
temporary Bailey bridge on the Sixth Concession Road, Lot 12, Concession 5,
former Township of Albion, Town of Caledon (Humber River watershed), be
approved, subject to:
(a) The Bailey bridge being at the same elevation as the original bridge~
(b) Spill zones being protected on either side of the proposed bridge;
(c) All works being completed to the satisfaction of the Authority~
(d) Every effort being made to minimize silting of the river during
construction;
CARRIED;
7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
City of Mississauga Parks Department
To construct a footbridge over drainage ditch, north-
east of Goreway and Etude Drives, City of Mississauga
(Mimico Creek)
A staff communication was presented advising that an application has been
received from the City of Mississauga Parks Department for permission to
construct a footbridge over a ditch which drains the parking lot of the
Westwood Mall at the above location.
Res. 1522 Moved by: C.F. Kline
Seconded by: Mrs. F. Gell
RESOLVED THAT: The staff communication, together with the application of the
City of Mississauga Parks Department, be received~ and
THAT the application of the City of Mississauga Parks Department for
permission to construct a footbridge over a drainage ditch on Lot 12,
Concession VIII, S.D., (Mimico Creek Watershed) be approved, subject to:
(a) All work being done in accordance with the plan prepared by the
City of Mississauga Recreation and Parks Department, Drawing 115,
Park No. 90, dated November 1979~
(b) Any excess fill or excavated material being removed from the site
immediately after completion of construction~
(c) Every effort being made to minimize erosion and siltation during
construction.
CARRIED;
8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Ministry of the Environment
To construct a portion of the York/Durham Sewage Works
in the valley of the German Mills Creek, Lots 38-42,
Concession 1, E.Y.S., Town of Richmond Hill (Don River
Watershed)
A staff communication was presented advising that an application has been
received from the Ministry of the Environment for permission to construct a
trunk sanitary sewer in the valley of the German Mills Creek at the above
location.
"-5- B-453
Res. 1523 Moved by: Mrs. L. Hancey
Seconded by: E.V. Kolb
RESOLVED THAT: The staff communication, together with the application of the
Ministry of the Environment, be received~ and
THAT the application of the Ministry of the Environment for permission to
undertake construction of a section of the York/Durham Sewage System along
German Mills Creek on Lots 38 to 42, Concession 1, E.Y.S., Town of Richmond
Hill (Don River watershed), be approved, subject to:
(a) All gabion and rip rap being preceded by a, filter mat or layer
of crushed stone;
(b) Every effort being made to minimize erosion anq siltation
during construction;
(c) All areas disturbed during construction being restored to the
satisfaction of the Authority.
CARRIED;
9. WATERFRONT PROJECT 1977-1981
-Property: The Ministry of the Environment
Res. 1524 Moved by: M.J. Breen
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The Report (December 4, 1979) set forth herein, received from
the Property Administrator, be adopted and that the Secretary-Treasurer be
authorized and directed to complete the purchase.
CARRIED;
-Re: Project: Waterfront Project 1977-1981
Pickering/Ajax Sector
Authority: Executive Resolution No. 460, Meeting '23 -
January 21, 1976 and Authority Resolution No.46,
Meeting #3 - April 9, 1976
Subject Property: West side of West Shore Boulevard
Owne r: Ministry of the Environment
Area to be Acquired: 0.180 acres, more or less
Recommended Purchase
Price: $14,880.00
"Included in the requirements for the above-noted project is a rectangular-
shaped parcel of land, being all of Lot 6, Registered Plan 270, Town of
Pickering, The Regional Municipality of Durham, having a frontage of 50 feet,
more or less, on the west side of West Shore Boulevard, south of Surf Avenue,
in the Frenchman Bay area.
"Negotiations have been conducted 'with officials of the Ministry of the
Environment and their representatives and, subject to the approval of your
Committee, agreement has been reached with respect to a purchase price, as
,follows:
The purchase price is to be $14,880.00, with date of completing
the transaction to be as soon'as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the pur9hase. All reasonable expense
incurred incidental to the closing, for land transfer tax, legal costs and
disbursements, are to be paid. The Authority is to receive a conveyance of
the land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"Funds are available. '
"An application has been made to the Ministry of Natural Resources for an
Inspection Certificate. a '
B-454 -'6-
10. CITY OF NORTH YORK
-Request for reconveyance of land
A staff communication was presented advising that a request has' been received
from the City of North York for the reconveyance of a small portion of a
larger parcel which was conveyed to the Authority on August 16, 1974.
Res. #525 Moved by: E.V. Kolb
Seconded by: E.H. Card
RESOLVED THAT: A parcel of Authority-owned land, containing 0.158 acres, more
or less, be reconveyed to the City of North York. Said land being composed
of Part of Block "A", Registered Plan M-1426, City of North York (The
Municipality of Metropolitan Toronto), designated as Part 1 on Plan 66R-11118
Consideration to be the nominal sum of $2.00, plus al..l legal, survey and
other costs involved in completing this transaction~ and
THAT said reconveyance be subject to an Order-in-Council being issued in
accordance with Section 20(c) of The Conservation Authorities Act, R.S.O.
1970, Chapter 78 as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and
directed to take whatever action may be required to give effect thereto,
including the obtaining of necessary approvals and the execution of any
documen ts .
CARRIED;
1l. JESUIT FATHERS OF UPPER CANADA HOLDING CORPORATION
-Request for release of Authority easement rights
A staff communication was presented advising that the Authority obtained a
flooding easement over 9.366 acres, more or less, of vacant land owned by the
Jesuit Fathers of Upper Canada Holding Corporation on February 5, 1969, under
Instrument No. 551225. The easement affected only a small portion of the
Jesuit Fathers' total holdings at this location.
Res. 11526 Moved by: Mrs. F. Gell
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Authority do grant, release and quit claim its interest in
that portion of flooding easement acquired from the Jesuit Fathers of Upper
Canada Holding Corporation on February 5, 1969, designated as that Part of
Block "F" on Plan M-1724, formerly within the limits of Parts 26, 29 and 30,
Plan 66R-8957, City of North York, The Municipality of Metropolitan Toronto;
and
THAT the appropriate Authority officials be authorized and directed to take
whatever action may be required to give effect thereto, including the
obtaining of necessary approvals and the execution of any documents.
CARRIED;
12. FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD
-Report #4/79
Mr. Scott presented Report 114/79 of the Flood Control and Water Conservation
Advisory Board.
Res. 11527 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: Report #4/79 of the Flood Control and Water Conservation
Advisory Board be received; and
THAT Recommendations #l and i2, as set forth herein, be adopted:
!! The 1980 Work Programme and the Current Priorities for Erosion Control
and Slope Stabilization in Metropolitan Toronto, as appended as part of
Schedule "A" of the Minutes of Meeting #4/79 of the Flood Control and
Water Conservation Advisory Board, be approved.
E The 1980 Work Programme and the Current Priorities for Erosion Control
in The Regional Municipalities of Peel, York and Durham, as appended as
part of Schedule "B" of the Minutes of Meeting #4/79 of the Flood
Control and Water Conservation Advisory Board, be approved.
CARRIED,
-7- B-455
13. PROJECT W.C.-6l - CHANNEL IMPROVEMENTS ON THE
DUFFIN CREEK IN THE TOWN OF WHITCHURCH-STOUFFVILLE
-Extra Work Order #2
A staff communication was presented advising that Change Order '2 to the
above contract has been received, as follows:
Change Order #2
(a) Lower existing 4" diameter watermain on Somerville Street
and lower existing 8" diameter watermain on Main Street,
including supply and installation of cement-lined ductile
iron pipe, fittings, stone bedding, thrust blocks and
granular bedding . . . $10,568.00
(b) Additional materials to bring curbs and parapet ~alls to
proper grade . . . 3,525.12
(c) Sawcut control joints and fill with sealer at Market Street
and Burkholder Street structures (including dewatering at
Burkholder Street) . . . 2,216.10
$16,309.22
Res. #528 Moved by: M.J. Breen
Seconded by: J.S. Scott
RESOL VED THAT: Extra Work Order #2 to the contract for Project W.C.-61 -
Channel Improvements on the Duffin Creek in the' Town of Whitchurch-
Stouffville, in the an~unt of $16,309.22, be approved.
CARRIED;
14. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
Erosion Control Works: #35 Canyon Avenue, City of North
York (Don River Watershed)
-Extra Work Order #l
A staff communication was presented advising that the following Change Order
has been received from Chisholm, Fleming & Associates for the erosion control
work contract at #35 Canyon Avenue, City of North York.
Change Order #l
(a) Gabion protection (37~ cubic yards) to provide
'additional bottom and slope protection . . . $ 2,625.00
(b) Additional, sodding (424 sq. yds. unpegged) to
provide immediate slope protection at the
upstream and downstream transition areas . . . 706.72
(c) Place 144.06 tons of 3/4-inch and 2-inch stone
beneath the invert gabions to provide a filter
blanket and working base . . . 353.96
$ 3,685.68
Res. #529 Moved by: C.F. Kline
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Extra Work Order #1 to the contract for erosion control work
at #35 Canyon Avenue, carried out by Gazzola Paving Limited, in the amount
of $3..685.68, be approved.
CARRIED~
15. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
Proposed Major Remedial Work: Nos. 31-39 Rivercove Drive,
Etobicoke (Mimico Creek Watershed)
A staff communication was presented advising that the above-noted site is in
the pool of major remedial work sites proposed for 1980 and is scheduled to
commence early in the new year.
Res. '530 Moved by: C.F. Kline
Seconded by: Mrs. J .A. Gardner
RESOLVED THAT: Erosion control and slope stabilization work be carried out at
B-456 -8-
Nos. 3l-39 Rivercove Drive at an estimated cost of $65,000.00, of which the
Authority's share is $40,000.00; and
THAT the benefiting owners contribute $3,400.00 towards the cost of the
erosion work; and further
THAT the benefiting owners contribute to the Authority that portion of the
land where the proposed work will be carried out; and further
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
16. FLOOD WARNING SYSTEM
-Acquisition of Weather Radar Equipment
A staff communication was presented having regard to .the proposed purchase of
an electroletic recorder to improve receipt of weather information through
the Authority's Flood Warning System.
Res. #531 Moved by: J.S. Scott
Seconded by: Mrs. S. Martin
RESOLVED THAT: The purchase of an electroletic recorder for receipt of
weather radar images in connection with the Authority's Flood Warning System,
at a cost not to exceed $3,000.00, be approved.
CARRIED;
17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Environmental Review of Flood Damage Centres
A communication was presented advising that, as part of the review for the
proposed Watershed Plan, staff analysis of the major flood damage centres
necessitates changes to the areas studied and listed, resulting in some
additional work to complete the study being carried out by the Proctor and
Redfern Group.
Res. #532 Moved by: Mrs. J.A. Gardner
Seconded by: M.J. Breen
RESOLVED THAT: An additional appropriation of $3,000.00 be approved for pay-
ment to the firm Proctor & Redfern Group for the completion of the Study of
Environmental Review of Flood Damage Centres; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED ~
18. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Completion of Dormitory - Phase I
A staff communication was presented advising that the Metropolitan Toronto
School Board has contracted with the firm of Gord Cheney Architects, Toronto,
to provide plans and specifications to increase the level of fire protection
as required by the Ontario Fire Marshal for students to occupy the Lake St.
George Phase I dormitory building.
Plans and specifications were provided to the following contractors for
quotation:
Dormitory modifications, as per specifications, plus fireproof spray
ceiling and joist; south wall, strap, insulate, drywall, tape;
dampers in floor diffusors:
Contractor Price Quoted
Leonard Construction $27,455.30
Bob Wood & Sons Limited 36,212.00
Paragon Drywall Systems No bid
D.M.D. Triangle Lathing No bid
McKinlay Drywall Specialists No bid
Lloyd Stelkley No bid
Res. #533 Moved by: M.J. Breen
Seconded by: E.H. Card
RESOLVED THAT: The quotation of Leonard Construction for the completion of
Phase I dormitory building at the Lake St. George Conservation Field Centre,
-9- B-457
in the amount of $27,455.30, be accepted~ it being the lowest quotation
received; and
THAT the entire cost for the completion be borne by the participating school
boards.
CARRIED~
19. REQUEST FOR NURSERY STOCK
-Township of Norwich
A staff communication was presented advising that the Authority is in receipt
of a request from the Clerk of the Township of Norwich for assistance in the
rehabilitation of the area adjacent to Woodstock, Ontario which suffered
severe damage during the recent tornado.
Res. #534 Moved by: C.F. Kline
Seconded by: Mrs. F. Gell
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
assist the Township of Norwich by making ~vailable up to 100 deciduous bare
root stock, 5 feet to a feet in hei9h~,.~et ~ea~ over a five-year period.
CARRIED;
20. NOTICE OF MOTION
The following Notice of Motion was submitted for consideration at the next
regular meeting of the Executive Committee, scheduled for Wednesday, January
9, 1979:
- Moved by: Mrs. J.A. Gardner
Seconded by: M.J. Breen
WHEREAS Regulations made by The Metropolitan Toronto and Region
Conservation Authorities Act, Section III, Sub-section 10.(1), state
that the Secretary-Treasurer or his substitute shall attend and
record the minutes of all meetings;
AND WHEREAS Section IX, Sub-section 44.(2) of the Regulations states
that the Secretary-Treasurer or his designate shall attend all
meetings of the Authority, its Boards and Committees and shall record
or cause to be recorded Minutes or Reports of all proceedings of such
meetings~
THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer be directed to
continue the present practice of recording the minutes of all
Committees and Sub-Committees: and
THAT Resolution #515 of Executive Committee Meeting '18/79, held
Wednesday, December 5, 1979, be rescinded."
2l. ADJOURNMENT
On Motion, the Meeting adjourned at 11:45 a.m., December 19.
R. Gran t Henderson K.G. Higgs
Chairman Secretary-Treasurer
" ,~
~ B- 4 5.8
,
the metropolitan toronto and region conservation authority
minutes Report .20/79
EXECUTIVE COMMITTEE WEDNESDAY-JANUARY-9-l980 '20/79
--
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, January 9, 1980, commencing at lO:OO a.m.
PRESENT WERE
Chairman R. Grant Henderson
Vice-Chairman Mrs. F. Gell
Members M.W.H. Biggar
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T. H . Leith
Mrs. S. Martin
J.S. Scott
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Finance Division G. Dudar
Adm. - Water Resource Division M.R. Garrett
Adm. - Property & Administration Division W.E. Jones
Research Planner, Planning & Policy Mrs. A.C. ueans
Development Coordinator, Planning & Policy J.W. Maletich
Head, Flood Control Section, WRD J.C. Mather
ABSENT WAS
Member M.J. Breen
MINUTES
The Minutes of Meeting #19/79 were presented.
Res. # 535 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: The Minutes of Meeting #l9/79, as presented, be adopted as if read.
CARRIED;
SECTION I
THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY
SECTION II
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
l. FLOOD EVENT - DECEMBER 24-25, 1979
Mr. J.C. Mather reported that during the period December 20-25, 1979, 3" to 31s-
of rain fell in the region, 2" to 2~" of this amount falling over the 4 8-hour
periOd of December 24-25. Due to frozen ground conditions, a significant run-
off was experienced, causing all rivers within the Authority's jurisdiction to
rise considerably.
B-459 -2-
Flooding was experienced on the Lower Don River, inundating the Bayview
Extension to a depth of 2 feet; flooding in the area included the Toronto
Brickyard and the Canadian National Railway tracks. This condition prevailed
for approximately 4-5 hours, after which the water began to subside.
Authority staff operated b~th the G. Ross Lord and the Claireville Dams, and a
significant quantity,of water was stored, thereby reducing the peak flows in
the 'lower parts of the watershed.
The flood level on the Lower Don River was the highest recorded since
Hurricane Hazel.
Res. #536 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: The Executive Committee express its gratitude to the members of
the staff who were on duty on Christmas Day, 1979, in response to the flood
event of December 24-25, 1979. CARRIED;
Res. #537 Moved by: Dr. T.H. Leith
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: The staff be directed to confer with the appropriate public
agencies to ensure that the Authority is notified of flooding occurrences that
are observed by staff of pUblic agencies in the course of their duties.
CARRIED;
The Chairman excused himself and asked the Vice-Chairman to take the Chair.
Mrs. Gell took the Chair.
2. NOTICE OF MOTION
-Recording of Minutes of Committee and
Sub-Committee Meetings
The Notice of Motion made at Meeting #19/79, held December 19, 1979, concern-
ing the recording of Minutes of Committees and Sub-Committees, was considered.
Motion Moved by: E.V. Kolb
Seconded by: C.F. Kline
WHEREAS Regulations made by The Metropolitan Toronto and Region Conservation
Authorities Act, Section III, Sub-section lO.(l), state that the Secretary-
Treasurer or his substitute shall attend and record the minutes of all
meetings;
AND WHEREAS Section IX, Sub-section 44.(2) of the Regulations states that the
Secretary-Treasurer or his designate shall attend all meetings of the
Authority, its Boards and Committees and shall record or cause to be recorded
Minutes or Reports of all proceedings of such meetings;
THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer be directed to continue
the present practice of recording the minutes of all Committees and Sub-
Committees; and
THAT Resolution #515 of Executive Committee Meeting '18/79, held Wednesday,
December 5, 1979, be rescinded.
Amendment Moved by: Mrs. L. Hancey
--------- Seconded by: J.S. Scott
RESOLVED THAT: The third paragraph of the above Motion, reading:
-THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer
be directed to continue the present practice of
recording the minutes of all Committees and Sub-
Commi t tees; "
be deleted.
-3- B-460
On a recorded vote - voting "YEA" - 7 Voting -NAY- - 3
Mrs. F. Gell M.W.H. Biggar
E.H. Card Mrs. J.A. Gardner
Mrs. L. Hancey Dr. T.H. Leith
C.F. Kline
E.V,. Kolb
Mrs. S. Martin
J.S. Scott
THE AMENDMENT WAS -------------------------------------------------- CARRIED~
Further Amendment
Moved by: J.S. Scott
Seconded by: C.F. Kline
RESOLVED THAT: The fourth paragraph of the Motion be amended to read:
"THAT Resolution #515 of Executive Committee Meeting #18/79, held
Wednesday, December 5, 1979, be rescinded as it is redundant. "
On a recorded vote - voting "YEA" - 8 Voting -NAY" - 2
Mrs. F. Gell M.W.H. Biggar
E.H. Card Mrs. J .A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Le i th
Mrs. S. Martin
J.S. Scott
THE AMENDMENT WAS -------------------------------------------------- CARRIED~
Res. #538 Moved by: E.V. Kolb
Seconded by: C.F. Kline
RESOLVED THAT: The motion, as amended, and which reads as follows:
WHEREAS Regulations made by The Metropolitan Toronto and Region Conservation
Authorities Act, Section III, Sub-section 10. (1) , state that the Secretary-
Treasurer or his substitute shall attend and record the minutes of all
meetings;
AND WHEREAS Section IX, Sub-section 44. (2) of the Regulations states that the
Secretary-Treasurer or his designate shall attend all meetings of the
Authority, its Boards and Committees and shall record or cause to be recorded
Minutes or Reports of all proceedings of such meetings;
THEREFORE BE IT RESOLVED THAT Resolution #515 of Executive Committee Meeting
U8/79, held WedneSday, December 5, 1979, be rescinded as it is redundant."
-be approved.
On a recorded vote - voting "YEA" - 8 Voting -NAY" - 2
Mrs. F. Gell M.W.H. Biggar
E.H. Card Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Lei th
Mrs. S. Martin
J.S. Scott
THE MOTION, AS AMENDED, WAS ---------------------------------------- CARRIED;
Mr. Henderson resumed the Chair.
3. FINANCIAL REPORT AND ACCOUNTS
-November, 1979
Mr. Scott presented the Financial Report and Accounts for the month of
November, 1979.
B-46l -4-
Res. i539 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Financial Statement for the month of November, 1979, be
received~ and that the payment of the Authority accounts, in the amount of
$1,00B,042.76, being (a) Current Expenditures - Wages & Salaries $250,635.79~
Materials & Supplies' $249,327.88; (b) Capital Expenditures - Wages & Salaries
$34,422.43; Materials & Supplies $445,225.79; and (c) Other Programs - Wages
& Salaries $7,6B9.Bl~ Materials & Supplies $20,741.06, be approved.
CARRIED,
4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. Submarine Limited
To renovate the interior of existing building, new
exterior wall treatment and pave existing parking
lot, Lot 23, Plan BOL-9, Town of Caledon (Humber
River Watershed)
A staff communication was presented advising that an application has been
received from Mr. Submarine Limited for permission to renovate the interior of
an existing building, provide exterior wall treatment and pave an existing
gravel parking lot at the above location.
Res. #5~O Moved by: E.V. Kolb
Seconded by: Mrs. F. Gell
RESOLVED THAT: The staff communication, together with the application of Mr.
Submarine Limited, be received; and
THAT the application of Mr. Submarine Limited for permission to renovate the
interior of an existing building, provide new exterior wall treatment and pave
an existing parking lot on Lot 23, Plan BOL-9 (Humber River watershed), be
approved, subject to:
(a) No fill being introduced to the site;
(b) The applicant complying with all municipal regulations and by-laws;
(c) Sheet #1 of the plan drawn by Mr. Submarine Limited for Store '229
forming part of the permit.
CA~ED;
. 5. EXCHANGE OF LANDS
-M.T.R.C.A. -&- Martin & Kathleen Gray
A communication was presented advising that the Authority has received a
request from Martin & Kathleen Gray to enter into an exchange of lands to
straighten and legalize existing property boundaries.
The Metropolitan Toronto Parks Department and the Authority's technical staff
have reviewed the parcels included in the proposed exchange, and are in agree-
ment that the exchange would be mutually beneficial to the Authority and to
Martin & Kathleen Gray.
Res. #541 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: Martin & Kathleen Gray convey to the Authority a parcel of land
containing 0.035 acres, more or less, being Part of Lot 1, Plan M-786, City of
North York, The Municipality of Metropolitan Toronto, in exchange for two
parcels of Authority-owned lands containing a total of 0.031 acres, more or
less, being Parts of Lots lB and 19, Concession II, E.Y.S., City of North York,
The Municipality of Metropolitan Toronto. The exchange is to be for the
nominal consideration of $2.00, with Martin & Kathleen Gray to be responsible
for payment of survey and their legal costs involved in the completion of this
exchange of lands; and
THAT said exchange be subject to an Order-in-Council being issued in accordance
with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78
as amended;
AND FURTHER THAT the appropriate Authority officials be authorized and directed
to sign the necessary documents to give effect thereto.
~ED,
-5- B-462
6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Property: 379407 Ontario Limited
West of road allowance between Concessions IX & X,
Town of Vaughan (Nashville Area)
Res. #542 Moved by: M.W.H. Biggar
Seconded by: C.F. Kline
RESOLVED THAT: The Report (December 18, 1979) set forth herein, received from
the Property & Administration Administrator, be adopted and that the Secretary-
Treasurer be authorized and directed to complete the purchase.
CARRIED 1
"Re: Project: In terim Wa ter & Related Land Management Project
1979-198l - Flood Plain and Valley Land Acquisition
Component: Humber River Watershed
Authority: Executive Resolution #133, Meeting #4 - April 12,
1978 and Authority Resolution #5l, Meeting #3 -
April 2l, 1978
Subject Property: West of Road Allowance between Concessions IX & X
Owner: 379407 Ontario Limited
Area to be acquired: 8.663 acres, more or less
Recomrneded Purchase Nominal consideration of #2.00, plus vendor's legal
Price: costs and the construction of a post and wire fence
on the northerly property boundary
"Included in the requirements for the above-noted project is an irregularly-
shaped parcel of land, being Part of Lot l, Concession X, Town of Vaughan,
formerly Township of King, The Regional Municipality of York, located in the
Nashville area.
"Negotiations have been conducted with the officials of 379407 Ontario Limited
and their solicitor, Mr. Joseph Abramsky, 943 St. Clair Avenue West, Toronto,
M6C lC7; and, subject to the approval of your Committee, agreement has been
reached with respect to a purchase price, as follows:
The purchase price is to be the nominal consideration of $2.00, plus
vendor's legal costs and the construction of a post and wire fence on
the northerly property boundary, with the transaction to be completed
as soon as possible.
"I recommend approval of this purchase and that the legal firm of Gardiner,
Roberts be instructed to complete the purchase. All reasonable expenses in-
curred incidental to the closing, for land transfer tax, legal costs and dis-
bursemen ts, are to be paid. The Authority is to receive a conveyance of the
land required free from encumbrance.
"The Administrator of the Water Resource Division has reviewed this proposed
acquisition and is in concurrence with my recommendation.
"An application has been made to the Minister of Natural Resources for an
Inspection Certificate."
7. BOROUGH OF YORK
-Request for Permanent Easement: west of Pasadena Gardens,
south of St. Mark's Road.
A staff communication was presented advising that a request has been received
from the Borough of York to provide a permanent easement for a storm sewer,
located west of Pasadena Gardens, south of St. Mark's Road, in the Jane Street
and Dundas Street West area.
Res. #543 Moved by: E.V. Kolb
Seconded by: Mrs. J.A. Gardner
RESOLVED THAT: A permanent easement be granted to the Borough of York for a
storm sewer, located west of Pasadena Gardens, south of St. Mark's Road, in
the Jane Street and Dundas Street West area. Said easement affects Authority-
owned land known as Part of Lot 4, Humber Range, Borough of York (The
Municipality of Metropolitan Toronto) . Said land is designated as Part 2 on
Plan 64R-8120. The easement to be granted for the nominal consideration of
$2.00, subject to the Borough of York being responsible for carrying out and
paying all legal, survey and other costs involved in the transaction; and
THAT the appropriate Authority officials be authorized and directed to sign
the necessary documents to give effect thereto.
CARRIED;
B-463 -6-
8. CANADIAN COASTAL CONFERENCE, BURLINGTON, ONT. , APRIL 22-24, 1980
-Attendance at
A staff communication was presented advising that the National Research Council
Associate Committee for Research on Shoreline Erosion and Sedimentation is
sponsoring a Canadi~n Coastal Confe~ence at the above location April 22-24,
198'0. The programme includes a number of topics related to shoreline manage-
ment and erosion control. There will also be a Short Course on Basic
Nearshore Processes on April 21, 1980.
The Conference Registration Fee is $50.00 a person, and the Short Course Fee is
$100.00 a person. Estimated expenses for transportation and other costs would ,
be $50.00 a person.
Res. #544 Moved by: C.F. Kline
Seconded by: M.W.H. Biggar
RESOLVED THAT: Mr. M.R. Garrett, Mr. B.E. Denney and Mrs. J.A. Gardner be
authorized to attend the Canadian Coastal Conference in Burlington, April 22-
24, 1980; and
THAT Mr. B.E. Denney be authorized to attend the Short Course on Basic
Nearshore Processes in Burlington on April 21, 1980;
AND FURTHER THAT their expenses in connection therewith, in the estimated
amount of $400.00, be paid.
CARRIED 1
9. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l981
-Proposed Major Remedial Work: Nos.39-47 Presley Avenue,
Scarborough (Don River Watershed) -
Supplementary Subsurface Investigation
A staff communication was presented advising that the staff is in receipt of a
proposal from Geocon (1975) Limited, Consulting Geotechnical Engineers, for
supplementary subsurface investigation at the above location.
Res. # 545 Moved by: J.S. Scott
-- Seconded by: E.H. Card
RESOLVED THAT: The staff be authorized to retain the firm Geocon (1975) Limited
Consulting Geotechnical Engineers, to carry out supplementary subsurface
investigation at Nos. 39-47 Presley Avenue, Borough of Scarborough (Don River
watershed) , at an estimated cost of $3,250.00.
CARRIED;
10. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Proposed Major Remedial Work: Nos.39-47 Presley Avenue,
Scarborough (Don River Watershed) -
Permanent Easement - Benefiting Owners
A staff communication was presented advising that, as outlined in the staff
report entitled "1980 Programme - Erosion Control and Slope Stabilization in
Metropolitan Toronto", which was approved by the Executive Committee at
Meeting #19/79, major remedial work at the above location is scheduled to
commence this year.
Res. #546 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: Having regard to proposed major remedial work at Nos. 39-47
Presley Avenue, Scarborough (Don River watershed) , scheduled to be carried out
in 1980, the benefiting property owners be required to provide a permanent
easement to the parcel of land on which the remedial work is proposed~ and
THAT the benefiting owners contribute to the Authority 120 feet at the rear of
their properties.
CARRIED.
ll. BOARD OF TRADE GOLF & COUNTRY CLUB,
TOWN OF VAUGHAN
The Secretary-Treasurer advised that he had been contacted by the Board of
Trade Golf and Country Club enquiring as to the Authority's interest in
negotiating an agreement for the use of Authority-owned flood plain lands on
-7- B-464
the Main Humber River in the Town of Vaughan for golf course purposes.
Res. #547 Moved by: Mrs. L. Hancey
Seconded by: E.V. Kol,b
RESOLVED THAT: The s,taff be authorized to enter into discussions for the lease
of flood plain lands on the Main Humber River in the Town of Vaughan to the
Board of Trade of Metropolitan Toronto for golf course use, on the basis that
compensation will be related to market value and that all criteria for flood
plain management will be met.
CARRIED;
12. CLAREMONT CONSERVATION FIELD CENTRE
-Quotation: Carpeting
A staff communication was presented advising that quotations have been received
for the supply and installation of carpeting in the living room of the
Claremont Conservation Field Centre building, and for the installation of 35
square yards of the best carpet taken from the living room in the corridor
over existing underpad, as follows:
Re-installation of
Supplier New Carpet Old Carpet
Simpson's
(Contract Division) $1,116.15 $120.75
T. Eaton Company 1,l58.00 80.00
Duncan Carpet No Bid No Bid
Res. #548 Moved by: E.H. Card
Seconded by: M.W.H. Biggar
RESOLVED THAT: The quotation received from Simpson's (Contract Division) for
the supply and installation of carpeting in the living room of the Claremont
Conservation Field Centre building, and for the installation of 35 square
yards of the best carpet taken from the living room in the corridor over exist-
ing underpad, in the amount of $1,236.90, be accepted; it being the lowest
quotation received.
CARRIED,
13. AMERICAN PUBLIC WORKS' ASSOCIATION WORKSHOP ON
EROSION AND SEDIMENT CONTROL, TO RONTO , ONT. ,
JULY 7-8, 1980
-Authority Sponsorship and Coordination
A staff communication was presented advising that a request has been received
from Mr. R.G. Ferguson, Vice-President, Ontario Chapter of the American Public
Works' Association that the Authority act as sponsoring agency and local co-
ordinator for the above-noted workshop.
Res. #549 Moved by: Dr: T.H. Leith
Seconded by: Mrs. s. Martin
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
agree to be designated sponsoring agency for the American Public Works'
Association Workshop on 'Erosion and Sediment Control', to be held in Toronto
July 7-8, 1980; and
THAT Mr. J.C. Mather be designated local co-ordinator on behalf of the
Authority.
CARRIED;
14. ADJOURNMENT
On Motion, the Meeting adjourned at l2:l5 p.m., January 9.
R. Grant Henderson W. A. McLean, Director of Planning & Policy
Chairman Acting Secretary-Treasurer
~ B-465
,
the metropolitan toronto and region conservation authority
minutes Report #21/79
EXECUTIVE COMMITTEE WEDNESDAY-JANUARY-23-1980 '21/79
The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview,
on Wednesday, January 23, 1980, commencing at 10:00 a.m.
PRESENT FOR THE HEARING
Chairman R. Grant Henderson
Vice Chairman .1rs. F. Gel!
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
Dr. T.H. Leith
Mrs. S. Martin
J.S. Scott
Authority Member Bal Vir Singh
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Director of Finance & Administration ti.E. Jones
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Water ~esource Division M.R. Garrett
Adm. - Conservation Land Management Division P.B. Flood
Planning Technician, Planning & Policy Miss A. Aitken
Research Planner, Planning & Policy Mrs. A.C. Deans
Head - Waterfront Section, NRD B.E. Denney
Planning Technician, Planning & Policy B.E. Knox
Development Co-ordinator, Planning & Policy J.W. Maletich
Head - Flood Control Section, WRD J.C. Mather
HEARING
Following the Roll Call, the meeting recessed to hold a Hearing re:
Mr. Reuben Parnes
Town of Markham
Rouge River Watershed
Miss L. Trivelli recorded the proceedings of the Hearing.
PRESENT FOR THE MEETING
Chairman R. Grant Henderson
Vice Chairman Mrs. F. Gel!
Members M.W.H. Biggar
M.J. Breen
E.H. Card
Mrs. J.A. Gardner
Mrs. L. Hancey
C.F. Kline
E.V. Kolb
,Dr. T.H. ..Leith
Mrs. S. Martin
J.S. Scott
Authority Member Bal Vir Singh
Secretary-Treasurer K.G. Higgs
Director of Planning & Policy W.A. McLean
Director of Finance & Administration W.E. Jones
B-466 -2-
PRESENT FOR THE ~ffiETING (Contd. )
Adm. - Information & Education Division T.E. Barber
Adm. - Historical Sites Division R.K. Cooper
Adm. - Conservation Land Management Division P.B. Flood
Adm. - Water Resource Division M.R. Garrett
Planning Technician, Planning & Policy Miss A. Aitken
Head - Waterfront Section, WRD B.E. Denney
Planning Technician, Planning & Policy B.E. Knox
Development Co-ordinator, Planning & Policy J.W. Maletich
Head - Flood Control Section, WRD J.C. Mather
Supervisor, Property Administration D.J. Prince
MINUTES
The Minutes of Meeting #20/79 were presented.
Res. #550 Moved by: E.H. Card
-- Seconded by: M.W.H. Biggar
RESOLVED THAT: The Minutes of Meeting #20/79, as presented, be adopted as if read.
CARRIED~
SECTION I
THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE
AUTHORITY AND RECOMMENDS THEIR ADOPTION:
l. STATUTORY RESOLUTIONS FOR THE TWENTY-FOURTH
ANNUAL MEETING OF THE AUTHORITY
A draft of certain Statutory Resolutions necessary for the Annual Meeting was
presented.
Res. #55l Moved by: E.H. Card
Seconded by: J.S. Scott
RESOLVED THAT: The draft of Statutory Resolutions prepared for the Twenty-
Fourth Annual Meeting of the Authority be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following Statutory Resolutions
be adopted at the Twenty-Fourth Annual Meeting of the Authority, scheduled
for Friday, February 1, 1980:
(a) ~~ntment of Auditors
THAT Clarkson, Gordon & Company be re-appointed as Auditors of the
Authority for the year 1980;
(b) Borrowing Resolution - 1980
WHEREAS it is necessary for The Metropolitan Toronto and Region
Conservation Authority (hereinafter called 'the Authority') to
borrow up to the sum of FIVE MILLION DOLLARS ($5,000,000.00)
required for its purposes until payment to the Authority of any
grants and of sums to be paid to the Authority by the participating
municipalities designated as such under The Conservation Authorities
Act, R.S.O. 1970, Chapter 78, as amended;
BE IT THEREFORE RESOLVED:
l. THAT the Authority may borrow from The Royal Bank of Canada or
the Authority's member municipalities up to the sum of FIVE
MILLION DOLLARS ($5,000,000.00) necessary for its purposes on
the promissory note or notes of the Authority until payment to
the Authority of any grants and of sums to be paid to the
Authority by the participating municipalities at such rate of
interest as the Minister of Natural Resources approves;
-3- B-467
2. THAT the signing officers of the Authority are hereby authorized
to execute for and on behalf of the Authority a promissory note
or notes for the sum to be borrowed under paragraph numbered 1
hereof and to affix thereto the Corporate Seal of the Authority:
3. THAT the amount borrowed pursuant to this resolution, together
with interest thereon at the rate approved by the Minister of
Natural Resources, be a charge upon the whole of the monies
received or to be received by the Authority by way of grants as
and when such monies are received and of sums received or to be
received by the Authority from the participating municipalities
as and when such monies are received;
4. THAT the signing officers of the Authority are hereby authorized
and directed to apply, in payment of the monies borrowed pursuant
to this resolution, together with interest thereon at the rate
approved by the Minister of Natural Resources, all monies
received by the Authority by way of grants or sums received by the
Authority from the participating municipalities.
CARRIED~
2. SCHEDULE OF MEETINGS - 1980-l981
The Secretary-Treasurer presented a proposed Schedule of Meetings for the
Executive Committee, Advisory Boards and the Authority for the year 1980.
Res. #552 Moved by: Mrs. L. Hancey
Seconded by: M.W.H. Biggar
RESOLVED THAT: The proposed Schedule of Meetings for 1980 be received; and
THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following Schedule of Meetings
be adopted for 1980:
FEBRUARY
FRIDAY FEBRUARY 1 2:00 P.M. AUTHORITY TWENTY-FOURTH ,ANNUAL
-- --
Friday February 8 1:30 p.m. Information & Education #1
Tuesday February 12 1:30 p.m. Conservation Land Mgt. U
Wednesday February 13 10:00 a.m. Executive il
Friday February l5 1:30 p.m. Flood Control U
FRIDAY FEB RUARY 22 2:00 P.M. AUTHORITY #2 (BUDGET)
--
MARCH
Wednesday March 5 10:00 a.m. Executive #2
Thursday March 6 1:30 p.m. Waterfront #l
FRIDAY MARCH 7 1:30 p.m. INFORMATION SEMINAR FOR
-- AUTHORITY MEMBERS REGARDING
THE WATERSHED PLAN
Tuesday March 11 1:30 p.m. Humber valley #l
Friday March 14 1:30 p.m. Historical Sites #1
Wednesday March 19 10:00 a.m. Executive #3
Friday March 21 1:30 p.m. Etobicoke-Mimico III
Wednesday March 26 1:30 p.m. Don valley il
Friday March 2 8 1:30 p.m. R.D.H.P. #!
APRIL
Wednesday April 2 10:00 a.m. Executive i4
Wednesday April 16 10:00 a.m. Executive i5
Wednesday April 30 10:00 a.m. Executive #6
B-468 -4-
MAY
FRID^Y MAY 9 2:00 P.M. AUTHORITY #3 (\'lATERSHED PLAN)
Wednesday Ma y 14 10:00 a.m. Executive #7
Wednesday May 28 10:00 a.m. Executive #8
JUNE
Wednesday June 11 10:00 a.m. Executive #9
FRID^Y JUNE 20 10:00 A.M. AUTHORITY # 4
-- ---
wednesday June 25 10:00 a.m. Executive #10
JULY
Wednesday July 9 10:00 a.m. Executive #11
Wednesday July 23 10:00 a.m. Executive #12
AUGUST
--
Wednesday August 6 lO:OO a.m. Executive #13
wednesday August 20 10:00 a.m. Execu ti ve # 14
SEPTEMBER
--
Wednesday September 10 10:00 a.m. Executive #15
Wednesday September 24 10:00 a.m. Executive #16
OCTOBER
Wednesday October 1 10:00 a.m. Executive #17
FRIDAY OCTOBER lO 2:00 P.M. AUTHORITY #5 (PRELIMINARY
-- BUDGET)
\'ledne sday October 15 10:00 a.m. Executive #18
Wednesday Oc tober 29 10:00 a.m. Executive #19
NOVEMBER
----
Wednesday November 12 10:00 a.m. Executive #20
Wednesday November 26 10:00 a.m. Executive #2l
DECEMBER
Wednesday December 10 lO:OO a.m. Executive #22
JANUARY 1981
Wednesday January 7 10:00 a.m. Executive #23
FRIDAY JANUARY 16 2:00 P.H. AUTHORITY TWENTY-FIFTH ANNUAL
--
wednesday January 28 10:00 a.m. Executive #1/81
FEBRUARY 1981
FRID^Y FEB RUARY 6 2:00 P.M. AUTHORITY #2 (BUDGET)
--
ANY ADDITIONAL MEETINGS REQUIRED WILL BE
HELD AT THL CALL OF THE CHAIR!I'.AN CONCERNED
CARRIED 1
3. THE METROPOLITAN TORONTO & REGION CONSERVATION FOUNDATION
-Appointment of New Member; Re-appointment of Me~ber
A communication was presented having regard to an appointment and a re-
appointment to The Metropolitan Toronto and Region Conservation Foundation.
Res. #553 Moved by: E.H. Card
Seconded by: M.W.H. Biggar
-5- B-469
RESOLVED THAT the communication having regard to the appointment of a new
member and the re-appointment of a member to The Metropolitan Toronto and
Region Conservation Foundation be received; and
THE EXECUTIVE COMMITTEE RECOM~ffiNDS THAT: The following recommendation of the
members of The Metropolitan Toronto and Region Conservation Foundation be
approved:
(a) That Mr. F. Collict, Vice-President - Human Resources, Allstate, be
invited to become a Member of The Metropolitan Toronto and Region
Conservation Foundation for a 3-year term commencing February 1, 1980~
(b) That Dr. T.H. Leith be re-appointed to the Foundation for a further
three-year period, commencing April 20, 1980. CARRIED~
SECTION II
-
THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING
ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE:
4 . APPOINTMENT OF CHAI RMAN OF THE AUTHORITY
-Mr. R. Grant Henderson
A communication was presented by the Secretary-Treasurer advising that Mr.
R. Grant Henderson has been re-appointed Chairman of The Metropolitan Toronto
and Region Conservation Authority for a further term, expiring with the first
meeting of the Authority in 1981.
Res. #554 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The communication having regard to the re-appointment of the
Chairman for a further term, expiring with the first meeting of the Authority
in 1981, be received; and
THAT the Executive Committee offer congratulations to Mr. R.G. Henderson on
his re-appointment.
CARRIED;
5. STAFF FINANCIAL PROGRESS REPORT
-October 1 to December 31, 1979
The staff presented a Financial Progress Report for the period October 1 to
December 31, 1979.
Res. #555 Moved by: C.F. Kline
Seconded by: E.V. Kolb
RESOLVED THAT: The Staff Financial Progress Report for the period October 1
to December 3l, 1979, be received and appended as Schedule "A" of these
Minutes.
CARRIED;
6. PERSONNEL SUB-COMMITTEE
-Report #7/79
Mrs. Hancey presented Report #7/79 of the Personnel Sub-Committee.
Res. #556 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Report #7/79 of the Personnel Sub-Committee be received and
appended as Schedule liB" of these Minutes; and
THAT the recommendations as contained therein be approved.
CARRIED 1
B-470 -6-
7. BLACK CREEK PIONEER VILLAGE BROCHURE
-Quotation #80-1: Printing
A staff communication was presented advising that the following quotations
have been received for the printing of 150,000 copies of the Black Creek
Pioneer village brochure:
Graphic Realm Limited .. . $3,171.37
Consumer Graphics Inc. . . . 3,452.25
Southam Murray Printing .. . 3,713.50
C.F. Haughton Limited . . . 3,788.00
Westprint . . . 3,985.50
Northern Miner Press .. . 4,058.73
Phipps Reproductions Co. Limited .. . 4,131.71
York Litho Limited . . . 4,222.00
Yorkville Press Co. Ltd. . . . 4,245.33
JHF Productions Canada Limited .. . 4,275.00
Pro-Art Graphics Ltd. .. . 4,289.68
Davis & Henderson Limited .. . 4,335.00
Cook Printing Canada Limited . . . 4,606.50
Charters Publishing Company Limited .. . 4,780.50
Multicolor Printing Limited . . . 4,910.12
Bambrick Printing Company Limited . . . 4,950.00
Labelcraft Products Ltd. .. . 5,350.50
Com-Ad Manufacturing Company Limited .. . 5,411.63
Noble Scott Company Limited .. . 5,598.24
R B Trade Printing Service Limited .. . 6,741.21
Hawker Siddeley Graphics .. . 6,939.49
Graphic Production Services . . . 7,231. 00
Canadian Offset Co. Ltd. .. . 7,530.00
York Printing House Limited . . . 8,441.68
Efmac Printing & Graphic Services Limited .. . NOT COMPLETE
Res. #557 Moved by: Dr. T.H. Leith
Seconded by: C.F. Kline
RESOLVED THAT: The contract for the printing and supply of 150,000 copies of
the Black Creek Pioneer Village brochure be awarded to Graphic Realm Limited
for the quoted sum of $3,171. 37 I including taxes.
CARRIED;
8. HUMBER ARBORETUM
-Progress Report
The staff presented a communication received from the Chairman of the Humber
Arboretum Management Committee and dated 1979.1l.13, submitted to update the
four governing bodies on progress made on the project during the first 18
months of operation.
Res. #558 Moved by: C.F. Kline
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The staff communication, together with the Humber Arboretum
Management Committee Progress Report dated 1979.11.13, and Master Plan
Review as prepared by Johnston, Sustronk, weinstein & Associates Limited, be
received; and
(a) That Mr. John W. Maletich, Development Co-ordinator, Planning & Policy,
continue to represent The Metropolitan Toronto and Region Conservation
Authority as a member of the Humber Arboretum Management Committee~
(b) That the Master Plan Review, as prepared by Johnson, Sustronk, Weinstein
& Associates Limited, be accepted in concert with the four co-operating
agencies and consistent with the four-party agreement as executed in
1977;
(c) That approval be granted to undertake the phase II development with
funds raised from private and corporate sources, matching Wintario
funds, student labour and the development funds as approved in accord-
ance with the four-party agreement.
CARRIED;
-7- B-471
9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
City of Mississauga ~
To replace existing storm sewer outlet on Mimico Creek
with larger pipe, east of C.N.R. tracks, south of
Highway #427 .
~
A staff communication was presented advising that an application has been
received from the City of Mississauga for permission to replace the existing
storm sewer outlet works at the above location with larg-~r pipe and re- ' ,
designed headwall.
Res. #559 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of the
City of Mississauga, be received; and
THAT the application of the City of Mississauga for permission to replace an
existing storm sewer outlet on Lot 8, Concession 8, City of Mississauga
(Mimico Creek watershed), be approved, subject to:
(a) Plans C-16836,.C-16705 and C-16835 forming part of the permit~
(b) Every effort being made to minimize silting of the creek;
(c) All areas disturbed due to construction being restored to the
satisfaction of the Authority.
CARRIED~
10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Bradmore Construction Limited
To construct apartment building on Part Lot 27,
Concession "B", east side Albion Road, Borough of
Etobicoke (Humber River Watershed)
A staff communication was presented advising that an application has been
received from Bradmore Construction Limited concerning proposed con-
struction of an apartment building at the above location.
Res. #560 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Bradmore Construction Limited, be received; and
THAT the application of Bradmore Construction Limited for permission to con-
struct an apartment building on Part of Lot 27, Concession "B", east side of
Albion Road, Borough of Etobicoke (Humber River watershed), be approved,
subject to:
(a) All surplus excavated fill being removed from the site~
(b) All works being in accordance with the grading plans as prepared by
E.I. Richmond Architects, Job. #7704, Sheet #1, dated November 27, 1979;
(c) Every effort being made to minimize silting of the watercourse during
construction;
(d) All works being completed to the satisfaction of the Authority and of
the Borough of Etobicoke.
CARRIED;
11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Mr. & Mrs. J. Jenkins
To construct gabion wall and reshape lands at rear of
#9 Lakeshore Drive, Borough of Etobicoke (Waterfront)
A staff communication was presented advising that an application has been
received from Mr. & Mrs. J. Jenkins for permission to construct a gabion wall
and reshape the lands at the rear of #9 Lakeshore Drive, Borough of Etobicoke.
Res. #561 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
B-472 -8-
RESOLVED THAT: The staff communication, together with the application of Mr.
and Mrs. J. Jenkins, be received; and
THAT the application of Mr. & Mrs. J. Jenkins for permission to construct a
gab ion wall and reshape lands on Lot 47, Plan 1783, Borough of Etobicoke
(Humber River watershed) , be approved, subject to:
(a) No fill being placed on the lakeward side of the wall;
(b) Stone for gabion baskets being imported, not removed from the beach;
.
(c) All work being completed to the satisfaction of the Authority;
(d) The alignment of the wall being such that it ties in neatly and
squarely with the existing armour stone on both sides of the property
and with the existing gabion basket walls on both neighbouring
properties.
CARRIED;
12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
North York General Hospital
To place fill on Pa~t Lots 14 & 15, Concession III, E.Y.S.,
south of Sheppard Avenue, east of Leslie Street, City of
Nortb York (Don River Watershed)
A staff communication was presented advising that a request has been received
from North York General Hospital for permission to place fill and reshape a
section of the valley side slope at the above location.
Res. #562 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
North York General Hospital, be received; and
THAT the application of North York General Hospital for permission to fill
and grade a section of the valley slope on Lots l4 and l5, Concession III,
E.Y.S., City of North York (Don River watershed) , be approved, SUbJect to:
(a) All work being carried out in accordance with Drawing U, Project
A 78-137, prepared by Deacon, Arnett, Murray and Rankin, dated
Novembe r , 1979,
(b) All work being carried out to the satisfaction of The Metropolitan
Toronto and Region Conservation Authority.
CARRIED~
13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
B. & J. Bouwmeister
To erect dwelling on south side of East Drive, west of
Kennedy Road in Unionville, Town of Markham (Rouge
River Watershed)
A staff communication was presented advising that an application has been
received from Bernard and Johanna Bouwmeister for permission to erect a
single-family dwelling at the above location.
Res. #563 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Bernard and Johanna Bouwmeister, be received; and
THAT the application of Bernard & Johanna Bouwmeister for permission to
erect a dwelling on Part of Lots 45 and 46, Registered Plan 2926, located on
the south side of East Drive, west of Kennedy Road, Unionville, Town of
Markham (Rouge River watershed), be approved, subject to:
(a) The proposed dwelling being erected within the building envelope
outlined on the plan prepared by Black & O'Connell Limited which
forms a part of the permit;
....9- B-473
(b) No openings to the dwelling being constructed below an elevation
of 174.9 metres;
(c) All work being carried out to the satisfaction of the Authority
and of the Town of Markham.
CARRIED~
14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73
Madrid Investments Limited
To regrade valley side slope and construct shopping centre
and associated parking, southwest corner of Highway #7 and
McCowan Road, Town of Markham (Rouge River Watershed)
A staff communication was presented advising that an application has been
received from Madrid Investments Limited for permission to regrade the side
Slope at the above location.
Res. #564 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The staff communication, together with the application of
Madrid Investments Limited, be received; and
THAT the application of Madrid Investments Limited for permission to regrade
the valley side slope and erect a shopping centre and associated parking on
Part Lot 10, Concession 6, Town of Markham (Rouge River watershed) , be
approved, subject to:
(a) Construction of the building and of the storm sewer outfall being under-
taken in accordance with Drawing # E-144-l, as prepared by Urban
Engineering Consultants and dated June 6, 1979, which forms part of the
permi t. This plan shows the site plan, cross sections and details of
the storm sewer outfall.
(b) Grading and landscaping being undertaken in accordance with Project
#79-24, Drawings L-l and L-2, as prepared by Landscape Planning Limited
and dated November 28 and 29, 1979 respectively, which also form part~
of the permit;
(c) All works being completed to the satisfaction of the Authority and of
the Town of Markham;
(d) Every effort being made to minimize the silting of the creek before,
during and after construction of the sewer outfall.
CARRIED;
15. EQUIPMENT RENTAL QUOTATIONS
-Water Resource & Conservation Land Manaqement Divisions
A staff communication was presented advising that quotations have been
requested from sixteen companies for the rental of equipment used by the
above-noted Divisions for carrying out their respective works programmes.
Quotations have been received from seven,companies.
Res. #565 Moved by: J.S. Scott
Seconded by: E.H. Card
RESOLVED THAT: The Water Resource and the Conservation Land Management
Divisions retain the services of Sartor & Susin Limited and Mark O'Conoor
for the rental of construction machinery during 1980, theirs being the two
lowest quotations received; and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED;
16. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981
-Erosion Control & Slope Stabilization in The Regional
Municipality of York: Proposed Remedial Work - Cedar
Grove, Lot 3, Concession 10, Town of Markham (Rouge
River Watershed)
A staff communication was presented advising that, as outlined in the staff
report enti tled "Erosion Control in the Regions of Peel, York and Durham -
1980", which was approved by the Executive Csmmittee at Meeting 119/79,
B-474 -10-
remedial work is proposed at the above location.
Res. #566 Moved by: Mrs. J.A. Gardner
Seconded by: Mrs. S. Martin
RESOLVED THAT: Erosion control work be carried out in Lot 3, Concession 10,
Town of Markham (Rouge River watershed) at an estimated cost of $5,000.00;
and
THAT the approval of the Ministry of Natural Resources be requested.
CARRIED ~
17. WATERFRONT PROJECT 1977-1981
-Scarborough Sector - Bluffers Park Waterfront Area Phase II:
Bluffers Park Boating Federation - Island Interior Shorelines
A staff communication was presented advising that the Bluffers Park Boating
Federation and one of its member clubs, the Cathedral Bluffs Yacht Club,
wish to proceed with development of the Federation Island as rapidly as
possible.
Res. #567 Moved by: Mrs. J.A. Gardner
Seconded by: M.W.H. Biggar
RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority
contribute toward the cost of the vertical wall shoreline protection to be
constructed by the Cathedral Bluffs Yacht Club at Bluffers Park Waterfront
Area, to a maximum of $30.00 per linear foot, subject to the wall being con-
structed to the satisfaction of the Authority in accordance with approved
design drawings; and
THAT the approval of the Province of Ontario be requested.
CARRIED~
18. DECISION OF HEARING
-Mr. Rueben Parnes
Town 0 f Markham
Rouge River Watershed
Res. #568 Moved by: Dr. T.H. Leith
Seconded by: Mrs. S. Martin
RESOLVED THAT: This Executive Committee confirm the decision of the Hearing
held this 23rd day of January, 1980; and
THAT the application of Mr. Rueben Parnes, in accordance with Ontario
Regulation 735/73, for permission to place fill and erect a dwelling on Pt.
Lot 20, Concession 5, R.R. #1, Unionville, Town of Markham (Rouge River
watershed) , be deferred until the applicant submits to the Authority the
following information:
(a) a detailed plan showing the footings and foundation of the proposed
single-storey residential dwelling'being submitted to the Authority;
(b) detailed drainage plans being submitted to the Authority for approval~
(e) a detailed landscaping plan also being submitted. This plan shall
indicate any and all trees and shrubs that have to be removed to
accommodate the dwelling and the private sewage disposal system.
Furthermore, this plan shall also indicate the new plant material
required for slope stabilization;
(d) no fill of any kind being placed beyond the westerly and southerly
wall exposures of the proposed dwelling;
(e) the recommendations and conditions as outlined in the soils report, as
prepared by Dominion Soils Investigation Inc., being strictly adhered
to;
(f) the application being in compliance with all existing municipal by-laws
and regulations.
CARRIED;
.,.11- B-475
19. PLASTIC GARBAGE BAGS
-Quotation #79-62
A staff communication was presented advising that the following quotations
have been received for tAe supply of 10,000 (AlA) 24" x 22" x 1.5 MIL,
10,000 (AIC) 26" x 36" x .2 MIL and 7,000 (AID) 36" x 50" x .3 MIL plastic
garbage containers for use throughout the Authority's operations:
Apache Plastics .. . $3,346.29
Modern \oJrapping .. . 4,055.56
Albion Industrial Hardware .. . 4,249.63
Canadian Bolt & Hook . . . 5,790.72
The above prices include Federal and provincial Sales Taxes
Res. #569 Moved by: C.F. Kline
Seconded by: f.~rs . L. Hancey
RESOLVED THAT: The quotation received from Apache Plastics for the supply of
lO,OOO plastic bags, style AlA; lO,OOO plastic bags, style A1C and 7,000
plastic bags, style A1D, in the sum of $3,346.29, including all taxes, be
accepted; it being the lowest quotation received.
CARRIED;
20. COLD CREEK CONSERVATION AREA
-Quotation #79-63: Targets & Ammunition
A staff communication was presented advising that the following quotations
have been received for the supply of Clay Bird Targets and ammunition for re-
sale for the programs at the Cold Creek Conservation Area:
Material Searle Outdoor Cochrane
Shooting Supplies Stores & Dunlop
600 cases Birds (Black) $2,454.00 $3,234.00 -
600 cases Birds (Yellow) $2,550.00 - -
70 cases 12 gauge shells $6,895.00 - $8,022.00
2 cases 20 gauge shells $ l80.00 - $ 229.00
1 case 410 gauge shells $ 90.00 - $ 115.00
2 cases .22 calibre shells $ 360.00 - $ 420.00
All prices are Sales Tax exempt
Res. #570 Moved by: Mrs. L. Hancey
Seconded by: E.H. Card
RESOLVED THAT: The quotation received from Searle Shooting Supplies, for the
supply of 1980 requirements of clay birds and ammunition at the Cold Creek
Conservation Area for resale, in the sum of $l2,529.00 (Provincial Sales Tax
exempt) , be accepted; it being the lowest quotation received.
CARRIED;
2l. ONTARIO PARKS ASSOCIATION EDUCATIONAL CONFERENCE,
HUMBER COLLEGE OF APPLIED ARTS AND TECHNOLOGY,
NORTHERN CAHPUS, REXDALE, ONT., FEBRUARY 15-16, 1980
-Attendance at
A staff communication was presented advising that the annual Ontario Parks
Association Educational Conference is being held at Humber College of Applied
Arts and Technology (Northern Campus) on February l5 and 16, 1980. The
agenda includes sessions dealing with vandalism, The Occupational Health and
Safety Act, staff training, revenue generation and publicity for parks.
Res. #571 Moved by: M.W.H. Biggar
Seconded by: J.S. Scott
RESOLVED THAT: Messrs. J. D. ;,gnew, S. Bontje, W. Robinson and W.G. Mulholland
be authorized to attend the untario Parks Association Annual Educational
Conference to be held at Hooll_er College of Applied Arts and Technology
(Northern Campus) February 1 ~ -16, 1980: and
THAT their expenses, including registration fees, in a sum not to exceed
$150.00, be paid.
CARRIED:
B-476 -12-
22. SEMINAR ON JOB ESTH1ATING AND COST ACCOUNTING
FOR THE LANDSCAPING INDCSTRY, HWIDER COLLEGE
OF APPLIED ARTS & 'l'ECHNOLOGY (NORTHERN CM~PUS) ,
REXDALE, ONT. , FEBRUARY 5 AND 12, 1980
-Attendance at
A staff communication was presented advising that the Humber Arboretum is
sponsoring a variety of one and two-day seminars at Humber College of Applied
Arts and Technology related to the landscaping industry. A workshop on job
estimating and cost accounting emphasizes proper estimating procedures as
they apply to plans and programmes.
Res. #572 Moved by: E.H. Card
Seconded by: Mrs. L. Hancey
RESOLVED THAT: Mr. Garry Misumi be authorized to attend the Seminar on Job
Estimating and Cost Accounting for the Landscaping Industry, to be held at
Humber College of Applied Arts and Technology, February 5 and 12, 1980; and
THAT his expenses, in an amount not toexceed $40.00, be paid.
CARRIED~
23. BRAMPTON ESKER STUDY
A staff communication was presented advising that correspondence has been
received from the City of Brampton regarding the establishment of a working
committee to study the Brampton Esker area and to "direct and oversee the
process of formulating a Secondary Plan".
The City has invited Authority participation on the working committee and has
proposed terms of reference for the study.
Res. #573 Moved by: J.S. Scott
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The Authority accept the invitation of the City of Brampton to
participat~ in a committee to study the Brampton Esker; and
THAT Mr. Paul B. Flood, Administrator, Conservation Land Management Division,
be designated to represent the Authority.
CARRIED~
24. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quota tions: 2 x 4's and fir plywood,
Dormitory Building - Phase II
A staff communication was presented advising that the following quotations
have been received for the supply of 2 x 4's and fir plywood to finish the
inside of the second dormitory at Lake St. George Conservation Field Centre:
2x4x8's 2x4xl6's !:i" fir pl~ 3/4" fir pl~
Lansing Lumber $0.153 $0.2035 $17.18 $23.15
Graham Lumber 0.165 0.2300 18.02 23.30
Cashway Lumber 0.170 0.2500 l8.25 25.25
~ti.tchell Lumber 0.187 0.2600 21.38 29.42
Card Lumber 0.200 0.2400 18.00 24 .00
Res. #574 Moved by: E.H. Card
Seconded by: Dr. T.H. Leith
RESOLVED THAT: The quotation received from Lansing Lumber for the supply of
2x4's and fir plywood to finish the inside of the second dormitory building
at the Lake St. George Conservation Field Centre, be accepted; it being the
lowest quotation received.
CARRIED:
25. LAKE ST. GEORGE CONSERVATION FIELD CENTRE
-Quota tions: Electrical Wiring & Fixtures
Dormitory Building - Phase II
A staff communication was presented advising that the following quotations
have been received for the supply and installation of electrical wiring and
fixtures in the second dormitory at the Lake St. George Conservation Field
Centre:
-],3- B-477
Price Quoted
Robertson Electric . . . . $5,850.00 P.S.T. Extra
Regent Electric . . . . $5,366.49 P.S.T. Extra
Res. #575 Moved by: Dr. T.H. Leith
Seconded by: M.J. Breen
RESOLVED THAT: The quotation received from Regent Electric for the supply
and installation of electrical wiring and fixtures in the second dormitory
at Lake St. George Conservation Field Centre, in the amount of $5,366.49,
plus Provincial Sales Tax, be accepted; it being the lowest quotation
received. CARRIED~
26. COMMUNITY RELATIONS - CONSERVATION EDUCATION WORKSHOP,
HOLIDAY INN, BURLINGTON, ONT., APRIL l3, 14 & 15, 1980
-Attendance at
A staff communication was presented advising that the Halton Region
Conservation Authority is hosting the above-noted Workshop, which will focus
attention on the importance of a community relations programme for a
conservation authority, and discuss practical ideas and techniques for
improving the effectiveness of such a programme.
Res. #576 Moved by: Mrs. L. Hancey
Seconded by: Dr. T.H. Leith
RESOLVED THAT: Dr. T.H. Le i th, Messrs. E.H. Card and T.E. Barber, and Miss
Ann Hayhoe, be authorized to attend the Community Relations - Conservation
Education Workshop to be hosted by the Halton Region Conservation Authority
on April 13, 14 and 1 5 , 1980, in Burlington, Ontario; and
THAT their expenses in connection therewith, in an estimated amount of
$150.00 for each delegate, be paid.
CARRIED~
NEW BUSINESS
27. PROPOSED AUTHORITY WATERFRONT TOUR
Res. #577 Moved by: M.W.H. Biggar
Seconded by: E.V. Kolb
RESOLVED THAT: The staff be requested to prepare a report on the
advisability of organizing a Waterfront tour in late Mayor early June, 1980
in place of the annual "Sugaring Off" event.
CARRIED;
28. PROMOTION - AUTHORITY AREAS, PROGRAMMES
AND FACILITIES
Res. #578 Moved by: Mrs. J.A. Gardner
Seconded by: M.J. Breen
RESOL VED THA T: The staff be requested to investigate opportunities for
promotion of the Authority's Areas, programmes and facilities, in co-
operation with the member municipalities and public utilities in the area
under the jurisdiction of the Authority, as part of their regular billing
process. CARRIED;
29. ANNOUNCEMENTS
Dr. Leith advised that Atkinson College, York University will present a
series of lectures on topics of current scientific and public interest on
January 30, February 5, 12 and 27, and March 4 and 11, 1980. Of interest
to the Authority are the following:
Wednesday, January 30: IS EVOLUTION A SCIENTIFIC THEORY?
Professor T.H. Leith
Atkinson College, York University
Tuesday, March 11: MANAGING A METROPOLITAN WATERSHED
IN THE NEXT QUARTER CENTURY
Mr. M. Garrett, Water Resource
Division, MTRCA
B-478 -14-
30. ANNOUNCEMENTS (Contd. )
Mr. Henderson announced the inaugural meeting of the Kawartha Region
Conservation Authority, which will be held at Lindsay , Ontario on February
6, 1980, at 7:30 p.m. This will be the 39th Authority in the Province.
3l. ADJOURNMENT
On Motion, the meeting adjourned at 1:20 p.m., January 23.
R. Grant Henderson K.G. Higgs
Chairman Secretary-Treasurer
SCHEDULE "An
B..479
STAFF PROGRESS REPORT
Property Division
During the period October 1, 1979, to December 31, 1979, the Property
Division completed the acquisition of 6 new properties containing 106.646
acres. The Authority also completed Settlement of Compensation on one
property previously expropriated. The total acreage of lands owned by
the Authority, as of December 31, 1979, is 26,598.011 acres. The total
acreage acquired by the Authority during 1979 was 565.846 acres.
The Property Division also carried out all of the routine administration
management required in connection with Authority-owned lands, Le. agreements,
easements, taxes, leases, rentals, insurance, etc.
A breakdown of the properties and acreages acquired by the Authority
to date is as follows:
FLOOD CONTROL AND WATER CONSERVATION
ETOBICOKE CREEK WATERSHED
Total to date--64 properties acquired containing 442.406 acres;
- 2 expropriations outstanding
MIMICO CREEK WATERSHED
Total to date--23 properties acquired containing 75.475 acres;
HUMBER RIVER WATERSHED
3 - Property sales during period
Total to date--727 properties acquired containing 8,281.830* acres;
- 1 expropriation outstanding
*corrected acreage
DON RIVER WATERSHED
Total to date--160 properties acquired containing 1,793.004 acres;
- 4 expropriations outstanding
HIGHLAND CREEK WATERSHED
Total to date--l39 properties acquired containing 820.708 acres;
ROUGE RIVER VALLEY WATERSHED
Total to date--110 properties acquired containing 2,074.636 acres;
DUFFIN'S CREEK WATERSHED
1 - Property settled during period containing 0.162 acres
- 1 purchase
Total to date--80 properties acquired containing 886.309 acres;
CONSERVATION AREAS
- Albion Hills Conservation Area
1 - Property sale during period
Total in Area--34 properties containing 1,034.702 acres;
- Black Creek Conservation Area
Total in Area--7 properties containing 113.966 acres~
- Bolton Community Conservation Area
Total in Area--4 properties containing 18.043 acres;
B-480
- 2 -
- Boyd Conservation Area
Total in Area--l2 properties containing 991.090 acres;
- Bruce's Mill Conservation Area
Total in Area--2 properties containing 267.038 acres;
- Cedar Mill Property
Total in Area--l property containing 0.337 acres;
- Claireville Conservation Area
Total in Area--l property containing 28.1l4 acres;
- Claremont Conservation Area
Total in Area--5 properties containing 396.750 acres;
- Cold Creek Conservation Area
Total in Area--6 properties containing 467.880 acres;
- Frenchman's Bay Conservation Area
Total in Area--9 properties containing 49.430 acres;
- Glassco Park
Total in Area--l property containing 482.000 acres;
- Glen Haffy Conservation Area
Total in Area--ll properties containing 802.206 acres;
- Greenwood Conservation Area
Total in Area--l4 properties containing 680.648 acres;
- Heart Lake Conservation Area
1 - Property settled during period containing 38.130 acres
1 - Purchase
Total in Area--9 properties containing 418.793 acres;
- Humber Trails Conservation Area
Total in Area--l property containing 48.664 acres;
- Oak bank Community Pond
Total in Area--l property containing 9.350 acres;
- Petticoat Creek Conservation Area
Total in Area--l property containing l77.9l8 acres;
- Lake St. George Conservation Area
Total in Area--l property containing 319.250 acres;
- Tam O'Shanter Conservation Area
Total in Area--l property containing 118.571 acres;
B-481
- 3 -
FOREST AND WILDLIFE AREAS
- Gibson Lake Forest and Wildlife Area
Total in Area--l property containing 137.l60 acres;
- Glen Major Forest and Wildlife Area
Total in Area--lO properties containing 1,442.057 acres;
- Goodwood Forest and Wildlife Area
Total in Area--6 properties containing ~07.639 acres;
- King Creek Forest and Wildlife Area
Total in Area--l property containing 0.1~5 acres;
- Palgrave Forest and Wildlife Area
Total in Area--7 properties containing 628.432 acres;
"
'!~
- Peter Wright Forest and Wildlife Area ,~'
(:
Total in Area--l property containing 20.9~~ acres;
..
AGREEMENT FOREST LANDS :~
%
- Uxbridge Forest and Wildlife Area 1
';)
Total in Area--l property containing 93.00'0 acres ~
,~
- Humber Forest Area i
Total in Area--22 properties containing 1,803.165 acres~
NIAGARA ESCARPMENT LANDS
Total in Area--4 properties containing 251.926 acres~
WATERFRONT PLAN
- Project W.F.-l - Etobicoke Sector
Total to date--6 properties acquired containing 68.616 acres;
- Project W.F.-2 - Ashbridge's Bay Sector
1 - Property settled during period containing 61.152 acres
1 - Purchase
Total to date--2 properties acquired containing 90.770 acres;
- Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete)
Total to date--4 properties acquired containing 0.641 acres;
- Project W.F.-3A - Pickering/Ajax Sector (Ext. No. 1)
1 - Property settled during period containing 2.160 acres
1 - Purchase
Total to date--150 properties acquired containing 493.173 acres~
B-482
- 4 -
- Project W.F.-4 - Scarborough Sector
3 - Properties settled during period containing 6.367 acres
2 - Purchases
1 - Expropriation settled
Total to date--54 properties acquired containing 461.190 acres;
SUMMARY
FLOOD CONTROL AND WATER CONSERVATION
October 1 to December 31, 1979 - 1 property settled containing 0.162
acres;
- (1 purchase)
- 3 property sales
Total to date--l,303 properties acquired containing 14,374.368* acres;
- 7 expropriations outstanding;
*corrected acreage
CONSERVATION AREAS
October 1 to December 31, 1979 - 1 property settled during period containing
38.130 acres;
- (1 purchase)
- 1 property sale
Total to date--121 properties acquired containing 6,424.750 acres~
FOREST AND WILDLIFE AREAS
October 1 to December 3l, 1979 -
Total to date--26 properties acquired containing 2,536.412 acres;
AGREEMENT FOREST LANDS
October 1 to December 3l, 1979 -
Total to date--23 properties acquired containing 1,896.165 acres;
.
NIAGARA ESCARPMENT LANDS
October 1 to December 3l, 1979 -
Total to date--4 properties acquired containing 251.926 acres~
WATERFRONT PLAN
October 1 to December 3l, 1979 - 5 properties settled during period containing
69.679 acres;
- (4 purchases)
- (1 expropriation settled)
Total to date--216 properties acquired containing 1,114.390 acres~
B-483
- 5 -
GRAND TOTAL OF ALL PROJECTS
October 1 to December 31, 1979 - 7 properties settled containing 107.971
acres;
- (6 purchases)
- (1 expropriation)
- 4 property sales
Total to date--l,693 properties acquired containing 26,598.011 acres~
- 7 expropriations outstanding.
PURCHASES AND SETTLEMENTS
January 1 to December 3l, 1979
Purchases during 1979 - 42
- Expropriations outstanding December 31, 1979 - 14
- Settled during 1979 - 11
- New properties expropriated during 1979 - 4
- Expropriations outstanding at December 31, 1979 - 7
B-484
Staff Progress Report, October 1 - December 31, 1979
Historical Sites Advisory Board
(1) PROGRAM
(a) Registration and Artifacts
During the last quarter of 1979 the Village received 21 donations con-
sisting of 60 articles. Items of note include: two beautiful 1848
samplers, an early Pennsylvania German Dulcimer, a steeple clock,
pewter plates, a cook stove, chairs, a cutter, several feather ticks
and pillows, and a pair of portieres. A crusie lamp, a betty lamp and
a shoulder yoke were acquired for the collection.
Black Creek was asked to provide field placement for a student from the
Museum Technology Program at Algonquin College in Ottawa. As a result,
for four weeks the Registration Department received the assistance of
a student whose training in textiles proved to be of great assistance
in the Textile Storage project.
(b) Publicity and Promotion
Artifacts from the collection at Black Creek have been loaned to the
Toronto Historical Board, the Art Gallery of Ontario, the North York
Library and the Town of Caledon for special exhibits in those locations.
In honour of the International Year of the Child, toys from the Village
collection were displayed for one week in October in the Yorkdale Mall.
The Village was used for several photography projects including a fash-
ion layout for T.V. Times of London, England (12 million circulation),
a demonstration of horsepower for an Ontario Hydro film on "Motors",
some footage on early settlers working for a documentary on dieting, a
Christmas baCkdrop for the CHUM/City TV Christmas Wish Campaign, the
setting for an edition of C.T.V. 's "Canada A.M." on Christmas Past, and
a half-hour program for French C.B.C. TV on Christmas traditions. A
mid-December edition of the Aurora Banner ran a full-colour full page
picture taken at Santa's Workshop in the Dalziel Barn.
Various staff were interviewed on site for a one-half hour program on
Christmas at Black Creek on C.K.O. radio; Mr. Cooper has been interviewed
twice on the John Bradshaw Show on C.F.R.B., staff have appeared on
Cable 10 T.V. in Richmond Hill, C.K.V.R. T.V. Barrie, and C.B.C. - TV
News.
Village staff have presented lectures to the following organizations:
the North York Historical Society, Deer Park United Church, Toronto West
Deanery, Club '48 Retired School Teachers, Milton Historical Society,
the Museology Program at the University of Toronto, Seneca College (three
times), Snelgrove Women's Institute, Markham High School night classes,
and North York Kiwanis. Staff members were instructors at two Ontario
Museum Association seminars and at the O.M.A. Annual Conference in Barrie.
(c) Special Events
During the last three months of 1979, 19 weddings were held in the Fisher-
ville Church, and Half Way House was the location for 29 receptions and
banquets. C.B.C. held its children's Christmas party at the Village and
1,100 attended. The 14th Annual C.F.R.B. Christmas service was taped on
December 17th for broadcasting on December 25th.
Village staff and livestock participated in fall festivals at Jordan and
Doon Pioneer Village.
On week-ends during the Christmas program, St. Philip's Lutheran Church
choir and the Girl Guides of Canada volunteered their time to sing
Christmas carols in the Village.
(d) Building Maintenance and Construction
The cabinetmaker who restores and refinishes collection furniture has
been relocated in the south end of the workshop under the Dominion
Carriage Works where a larger working space is available and better
ventilation is provided.
B-485
- 2 -
Reconstruction of the Taylor Cooperage has been 90% completed. Mater-
ials donated from a barn in Pickering were used to provide siding and
flooring for the Cooperage.
A new door into Mackenzie basement has been installed at the 'foot of
the stairs to improve climate control in the textile storage area.
The two portables have been re-roofed and work has almost been completed
for hydro into these buildings.
(e) Ground Maintenance and Development
There was continued fence building and repairing throughout the Village
with special attention to the area around the snack bar in an attempt
to improve the appearance of that area.
A large new front-end loader has been obtained which will improve Village
clean-up and snow removal.
All picnic tables (l02) have been removed from the Valley area to the
workshop yard for repair and restaining through the winter.
As a result of a blockage of a storm drain maintained by the Town of
Vaughan, runoff from heavy rain caused part of the Village road under
Jane and Steeles to wash out on Christmas Day. It has been filled,
graded and restored to use by Village staff.
Grading has been carried out to raise the ground level around the Domin-
ion Carriage Works and on the east side of the Town Hall to help prevent
water seeping into basement rooms.
(f) Livestock
The poultry population in the Village was reduced for the winter with the
excess birds prepared and frozen for use in Village home demonstrations
through 1980.
This year it has been decided to breed one sow in an attempt to raise
our own pigs for next season. The other sows have been marketed.
(g) Staff
Six staff members attended the Annual Conference of the Ontario Museum
Association in Barrie. One staff member, J. Hughes, is president of
the O.M.A. Four staff members participated in the pre-conference
seminar on Museum gift shops also held in Barrie. Village staff also
participate on the executive committees and as members of the Costume
Society of Ontario, the Pennsylvania German Folklore Society of Ontario
and the York Chapter of the Pennsylvania German Folklore Society.
(2) INTERIM FINANCIAL STATEMENT - JANUARY 1 TO DECEMBER 31, 1979
(a) Operations and Maintenance
Total Budget Used
Appropriation Budget Variance %
Expenditures 953,599 889,000 64,599 107
Revenue 829,594 750,000 79,594 III
(b) Development
Total Budget Used
Appropriation Budget Variance ,
Expenditures 47,401 70,917 23,516 66
B-486
- 3 -
(3) FINANCIAL COMMENTS
(a) Operations and Maintenance
1979 was a successful year financially for Black Creek. Expenditures
were higher than estimated, but revenues also exceeded expectation~.
Attendance in 1979 was 283,255, a drop of 10,000 from the 1978 figures.
This decrease can be attributed to a decline of 8,000 in school tours,
the energy shortage, the economic slump and to the unseasonable
December weather. The Village cit~zenship program had 421 members in
1979. The Dickson's Hill School program continues to be fully booked,
and lS classes attended during the fall season.
(b) Historical Sites Development
The restoration of the Taylor Cooperage is nearing completion. The
use of some materials donated by Runnymede Development Corporation,
has helped keep costs down on this project.
Work on the Sawyer's House is now progressing satisfactorily. Consider-
able delays were experienced in the installation of hydro, but as soon
as the heating system is completed, the restoration work can be resumed.
Some work has been done on the Richmond Hill Hanse restoration, and this
will continue in 1980 as funds become available.
B-487
TO: The Chairman and Members of the Executive Committee -
M.T.R.C.A. - Meeting #20/79 - Wednesday, January 23, 1980
FROM: G. Dudar, Administrator, Finance Division
RE: Staff Report - January l, 1979 to December 31, 1979
ADMINISTRATION
Budget Est. Actual Surplus
Dec 31/1979 (Deficit)
Expenditures:
Salaries $560,150 $549,800 $10,350
Benefits 440,500 424,100 16,400
Travel & Expenses 97,500 91,800 5,700
Equipment purchase
and rental 36,000 32,500 3,500
Materials & Supplies 81,500 90,200 ( 8,700 )
Rents & Utilities 77,250 84,000 ( 6,750 )
General 54,100 65,000 (10,900 )
1,347,000 1,337,400 9,600
Revenues 70,000 56,200 (13,800 )
Net Expenditures 1,277,000 1,281,200 ( 4,200 )
OPERATIONS & MAINTENANCE - GENERAL OPERATIONS
Expenditures:
Flood Control Workshop 1,500 2,800 ( 1,300 )
Vehicle Suspense 5,000 5,000 -
Insurance 12,000 10,300 1,700
Head Office Renovation lO,OOO 2,600 7,400
Office Cleaning 19,000 19,500 ( 500 )
Office Maintenance 32,000 39,000 ( 7,000 )
Rental Property
Maintenance and
Miscellaneous 32,500 32,500 -
112,000 111,700 300
Revenues . 16,500 27,000 10,500
Net Expenditures 95,500 84,700 10,800
/j
1980.01.14.
B-488
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.
FROM: Mr. M. R. Garrett, Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO DECElo1~ER 31~ 1979
FLOOD CONTROL SECTION
(1) MAINTENANCE WATER CONTROL STRUCTURES
(a) PROGRESS
Normal day to day maintenance was carried out on all the water
control structures. This year's major maintenance program saw the
completion of fencing at the Brampton Diversion Channel, the study
of the Lower Humber Weirs and the cleaning of the drainage channel
and construction of an access road at the Goodwood Pumping Station.
(b) FINANCIAL STATEMENT TO DECEMBER 31, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec/31/7,9
$ $ $ $ , $
Maintenance 159,513.97 134.00 159,647.97 l84,000.00 86 184,000.00
(c) FINANCIAL COMMENT
The maintenance program appears to be slightly under the above noted
figures however, it is expected that close to the budget will be spent
once the final accounting has been completed.
(2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS
(a) PROGRESS
The Authority completed its three-year program for the acquiSition of
radio communication equipment. The Authority's system after this
three-year program has comprised of:
3 Consolette Base Stations
1 Mocom 10 Base Station
20 Mocom 70 Mobiles
1 Micor Repeater
2 Local Desk Set
11 MH10 Portables
1 Duplexer
The Authority also acquired a new weather radar receiving equipment.
(b) FINANCIAL STATEMENT TO DECEMBER 31, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec/31/79
$ $ $ $ , $
Telemark 7,171.04 0 7,177 . 04 8,000.00 89 7,171.04
Gauges
Radio System 15,766.20 0 15.766.20 15,000.00 105 15,766.20
Staff 66,022.98 0 66,022.98 65,800.00 100 66,022.98
Salaries
Staff Travel 1,825.34 0 1,825.34 3,700.00 49 1,825.34
90,791.56 0 90,791.56 92,500.00 98 90,791. 56
/2 . . . .
B-489
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.
FROM: Mr. M. R. Garrett, Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 Page 2
(2) (c) FINANCIAL COMMENT
Except for the small over-expenditure on the radio system, the
remaining items are on target.
(3) INTERIM PROJECT CAPITAL
(a) PROGRESS
The Flood Plain Acquisition Programme continued in 1979 and completed
the acquisition programme within the Village of Stouffville.
Under the Flood Control Plan Review, the Authority has completed its
hydrologic model study and the preparation of the new floodline maps
for all of its watersheds.
A Damage Centre Analysis Study was carried out and the final report
is expected early in January, 1980.
The Environmental Monitoring Programme continued throughout 1979 and
the final report is expected early in January, 1980.
(b) FINANCIAL STATEMENT TO DECEMBER 31, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec/31/79
$ $ $ $ , $
Flood Plain l,489,982.43 74.00 1,490,056.43 667,273.00 223 1,500,000.00
Acquisition
Headwater l47,275.59 0 147,275.59 200,000.00 73 147,275.59
AcquiSition
Damage Centre 54,745.47 0 54,745.47 75,000.00 72 55,000.00
Analysis
Environmental 63,127.99 0 63,127.99 100,000.00 63 70,000.00
Monitoring
Flood Control 244,542.39 103.00 244,645.39 297,000.00 82 250,000.00
Plan Review
Milne Dam 11,000.00 0 11,000.00 20,450.00 51 11,000.00
Workshop
2,010,673.87 l77.00 2,010,850.87 1,359,723.00 147 2,033,275.59
(c) FINANCIAL COMMENT
Except for the acquisition budget, the remaining items are relatively
close to the budget allocated. This is due in part of the fact that
some of the engineering studies orignally to be completed in 1979 had
to be extended into 1980 thereby under-spending the 1979 budget
allocation.
/3....
B-490
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.
FROM: Mr. M. R. Garrett, Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 Page 3
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS
Erosion Control and Slope Stabilization in Metro:
ITEM LOCATION WATERSHED STATUS
Major Remedial 6-14 Sulkara Court Don River Completed
Work 19-45 Riverview Heights Humber River Completed
50-58 Stanwood Crescent Humber River Completed
Enfield/Sunset/Jellicoe Etobicoke Completed
Ave. Creek
10 Codeco Court (Phase I Don River Completed
Sweeney Drive Slope Don River Completed
MOdification
35 Canyon Avenue Don River Completed
Minor Remedial Beechgrove Rd.- Phase II Highland Completed
Work Creek
34 Restwell Crescent Don River Completed
Deanewood Crescent Mimico Creek Completed
Vicinity
Dawes Road (2 sites) Don River Completed
Twyn Rivers Rouge River Completed
Glen Rouge Trailer Camp Rouge River Completed
Together with the foregoing, spring revegetation was carried out at
8 sites, fall revegetation was carried out at 7 sites and
maintenance work was carried out at 4 sites. Also preventative
work was carried out at Nos. 3l-35 Rivercove Drive and 8-14 Bruce
Farm Drive 'as an interim measure, until permanent works can be
carried out in 1980.
/4....
B-491
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.
FROM: Mr. M. R. Garrett, Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT Page 4
FROM JANUARY 1, 1979 ~O DECEMBER 31, 1979
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS (Cont'd)
Erosion Control and Slope Stabilization in the Regions of Peel, York
and Durham
REGION LOCATION WATERSHED STATUS
Peel Sherway Drive, Mississauga Etobicoke Creek Completed
138 King Street, Bolton Humber River Completed
Wildwood Park (2 sites) Mimico Creek completed
York 14th Avenue - Phase I Rouge River Completed
Lots 5 & 6 Conc.a, Markham
19th Avenue Rouge River Completed
Lot 30, Conc.8, Mar kham
7374 Kipling Avenue, Woodbridge Humber River Completed
7440 Kipling Avenue, woodbridge Humber River Completed
8254 Pine Valley Dr. Vicinity Humber River Completed
Woodbridge
Town Line, Bolton Humber River Completed
Durham 558 Pine Ridg~ Road Vicinity Rouge River Completed
Pickering
Elizabeth Street, Ajax Duffin Creek completed
I
Reconstruction of Highland Creek
1979 was the third year of the three-year programme for remedial
work within the Highland Creek. Work has been completed at the
following sites.
.
LOCATION STATUS
Morningside Parks Yard Completed
Scarborough College - Tennis Courts Completed
South of Kingston Road Bridge Completed
Beechgrove (Colonel Danforth Park) Completed
Watermain at Scarborough College Completed
Scarborough Golf Course Completed
All of the major damaged areas identified under the Highland
Creek project have now been repaired and the funds allocated for
this work expended.
/S . . . .
B-492
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.
FROM: Mr. M. R. Garrett, Administrator - Water Resource Division
RE: WATER RESOURCE DIVISION PROGRESS REPORT
FROM JANUARY l, 1979 TO DECEMBER 31, ~979 Page 5
(4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY)
(a) PROGRESS (Cont'd)
Stouffville Channel:
The Authority completed the final engineering for the Stouffville
Channel and awarded the contract in August, 1979. Approximately
95% of the contract has been completed with the remaining cleanup
and restoration to be done for the Spring in 1980.
Oak Ridges Study:
Authority has received the preliminary engineering study for the
Oak Ridges Channel Improvements and has prepared a brief for the
Province of Ontario with the expectation that the final design and
construction will be done in 1980.
(b) FINANCIAL STATEMENT TO DECEMBER 3l, 1979
Year , of Forecast
To Date Total Budget to
Expend. Commitments Approp. Budget Used Dec.31/79
$ $ $ $ % $
W.C.-58 99,690.00 0 99,690.00 99,690.00 100 99,690.00
Erosion 707,643.90 29,293.00 736,936.90 800,000.00 92 750,000.00
Control
Metro
Erosion l26,4l6.45 493.00 126,909.45 200,000.00 63 175,000.00
Control
Peel, York
& Durham
Highland 187,52l.03 0 l87,521.03 240,000.00 78 230,000.00
Creek
Restoration
Stouffville 514,561.01 17,800.00 532,361.01 395,000.00 130 550,000.00
Channel
Wilket 0 0 0 10,000.00 0 0
Creek
Oak Ridges 7,142.32 0 7,142.32 5,000.00 142 7,500.00
1,642,974.71 47,586.00 l,690,560.7l 1,749,690.00 97l,8l2,190.00
(c) FINANCIAL COMMENT
All of the items will be on target except for the Stouffville Channel
construction which will be over-expensed due to the decision to
carry out all of the works in 1979. The Erosion Control Metro, the
Erosion Control Peel, York and Durham and the Highland Creek
Restoration programs all appear to be slightly under the budgeted
figures, however, it is expected that once the final accounting has
been completed, that most of the budget will be expended.
1979.01.15
JCM/fn
B-493
TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE,
M.T.R.C.A. - Meeting # 21/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE SIX
1979 was a relatively successful year for waterfront development in
spite of the fact that provincial approval was not received for the
Supplementary Waterfront Project. Although funding was not as high
as expected, it was possible to make a start on shoreline management
work by delaying some site development at Humber Bay and at Bluffers.
It is still possible that the supplementary project funding will be
available for 1980 and 1981.
COLONEL SAMUEL BOIS SMITH PARK
The Master Plan was completed in 1978 and submitted to the Ministry
of Natural Resources and the Ministry of the Environment. MNR
approval was received early in 1979. The response from the Minister
of the Environment concerning the application by the Authority for
the approval of the Colonel Samuel Bois Smith Master Plan under the
Environmental Assessment Act was received in September. It is the
recommendation of the Minister that:
" (a) The environmental assessment be accepted; and
(b) The undertaking as proposed be refused approval
to proceed according to the provisions of
section 14 of the Act. "
The Minister has also recommended that a Hearing be held before the
Environmental Assessment Board. It appears that the Hearing could
commence on April 14, 1980.
HUMBER BAY WEST
The total area created as part of the Humber Bay West project is now
64 acres.
The Master' Plan shape was achieved in February 1979, at which time the
landfilling operation was terminated.
The Humber Bay Boating Federation had a very successful season.
Approximately 460 boats were moored at the site and the waiting list
has been cut off at 300. It is anticipated that the Federation will
easily reach the design capacity of Humber Bay by next season and
should be able to undertake the construction of some of the associated
land-based facilities.
Discussions were held with the Federation to finalize development
priorities for 1980. The Preliminary Budget Estimates provide for
interior shoreline stabilization, servicing and completion of grading.
Design of these elements is underway and a final decision on the
actual development program will be made pending the final budget
allocation to be determined early in 1980.
HUMBER BAY EAST
A contract was awarded to M. A. Butt in the amount of $780,722.70 at
Executive Committee Meeting #8/79 on June 13, 1979 for the construction
of the park buildings, foot bridges and other site development features.
Construction is 85% completed, but delays in supply of certain materials
have prolonged the job by approximately two months. Completion is now
scheduled for the end of February.
Final landscaping will be undertaken by the Conservation Land Management
Division in the spring of 1980.
The major development objectives in 1980 will be the completion of land-
scaping and the Baving of the entrance road and parking areas.
\
Authority staff ~nstalled the liner in the pond system as well as the
water supply forcemains. The pond system is now operational and is being
tested.
(
\
"
I
)
B-494
TO: THE CHAIRMAN AND MEHBERS OF THE EXECUTIVE COMMITTEE,
M.T.R.C.A. - Meeting #21/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOORCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE SEVEN
WESTERN BEACHES
The Authority's involvement in this area in 1979 was restricted to
the completion of a detailed Master Plan. It is planned to include
some works in this area in the next Five-Year Project.
The Sunnyside Pavilion continued to deteriorate and since the Authority
was unable to undertake the restoration of the building, the City of
Toronto initiated plans to refurbish the structure.
BLUFFERS, PHASE II
Fill receipts totalling approximately 300,000 cubic yards resulted in
good progress being made towards the completion of the breakwater.
Filling was concentrated along the breakwater between Points 8 and 9,
as well as the easterly end of the island during the winter months.
Federal funding of the project under the Small Craft Harbours Assist-
ance Program continued. Armouring of Point 9 was completed. Stone
has been purchased and stockpiled for armouring of Point 8 in 1980.
The Bluffers Boating Federation successfully installed approximately
120 mooring slips. Landfilling over the winter months will concentrate
on completion of sufficient land base to allow construction of approxi-
mately 140 slips in 1980.
Dil!!cussions have been held with the Boating Federation to finalize
development priorities for 1980. The Preliminary Budget Estimates
provide for interior shoreline stabilization, servicing and completion
of the landfilling.
The construction of the new launching ramps and day mooring docks
was completed. The construction of the permanent parking lot associ-
ated with the launching ramps, as well as the extension of the
parking area associated with Phase I was also completed.
Installation of permanent underground hydro service to the Boating
Federation Island was completed early in December.
AQUATIC PARK
The future involvement of the Authority in the development of Aquatic
Park became more probable in 1979 as the result of a project to
construct a dredgate disposal area on the exposed shoreline, which
will help to resolve the final armouring issue. Serious discussion
related to transfer of title for the area from the province to the
Authority also took place in 1979.
EAST POINT
Discussions will be completed early in 1980 with the Authority's
consultant, Hough, Stansbury and Michalski Ltd. , in an effort to
finalize the Master Plan Review and to prepare site plans. Construc-
tion is expected to begin at this site upon completion of Bluffers
Park.
ENVIRONMENTAL MONITORING
The collection of field data on water quality, sediment quality,
benthos and fish populations was completed in December. A report was
prepared by Authority staff and consultants which described an
extensive examination of bottom conditions in the area of East Point
Park (by scuba diving) . The work was done as part of the Master
Plan Review.
B-495
TO: THE CHAIRMAN AND HEMBERS OF THE EXECUTIVE COMMITTEE,
M.T.R.C.A. - Meeting 1121/79
FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION
RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM
JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE EIGHT
Environmental Monitoring (continued)
The Ministries of the Environment and Natural Resources continued to
raise concerns about the landfilling process. A technical committee
was established consisting of representatives of the two Ministries
and the Authority to review the impact of landfilling. Data collected
in previous waterfront monitoring programs was extremely valuable in
this process. The final report is to be prepared by March 1980.
SHORELINE HANAGEMENT
Preparation of a detailed Master Plan in the Scarborough sector is
ongoing. Provincial approval was received to retain a consultant to
examine certain soil mechanics and slope stability questions along
the Scarborough Bluffs, aimed at producing recommendations on
appropriate construction techniques to stabilize the bluff face
after the toe of the bluffs has been protected.
Construction of an offshore revetment was completed at Crescentwood
Park. The work was done to protect the toe of the fill material
placed by the Borough of Scarborough last fall to save portions of
Crescentwood Road and underground services which were threatened.
The work was carried out by rented machines under the supervision of
Authority staff.
The next priority is the Kingsbury-Harding area which was partially
protected by a program of fill i ng by the Borough of Scarborough over
the summer. Although protection of the toe of the newly formed slope
is required. staff felt that substantial settlement and slides are
inevitable in this area and therefore it was not safe to work in
that area.
Therefore, work was undertaken at the Eastern Beaches to stabilize the
shoreline and provide for reconstruction of the boardwalk. This work
will be substantially complete by January 31, 1980.
to
PRELIMINARY FINANCIAL STATEMENT TO DECEMBER 31, 1979 I
~
\0
0\
Year to Date Estimated Final Estimated Final
as per Preliminary Total , of Budget Total Expenditures
Site Year End Printout COIIUIlitments Appropriation Budget Used at Dec. 31/79
Colonel Sam Smith 6,008.81 0 6,008.81 50,000 12 6,008.81
Humber Bay West 117,679.06 0 117,679.06 160,000 96 153,143.31
Humber Bay East 820,582.69 88,094.00 908,676.69 950,000 97 918,673.00
Western Beaches 0 0 0 5,000 . 103 5,135.65
Ashbridge's Bay 8,479.90 0 8,479.90 5,000 205 10,263.00
Bluffers Park 645,134.94 36,490.00 681,624.94 740,000 102 756,459.10
East Point Park 34,111. 03 0 34,111.03 20,000 171 34,111.03
Petticoat Creek 5,344.16 0 5,344.16 20,000 88 17,501.48
Studies/Salaries 47,395.32 0 47.395.32 50,000 95 47,395.32
StudiesjMonitoring 43.648.51 0 43,648.51 60,000 89 53,587.66
Shoreline Management 291,535.58 2,603.00 294,138.58 500,000 93 463,955.62
Land Acquisition 321,329.41 0 321,329.41 240,000 144 346,404.41
PROGRAM TOTALS 2,341.249.41 127,187.00 2,468,436.41 2,800,000 100.5 2,812.638.00
COMMENTS: The objectives for Waberfront Planning and Development in 1979 have generally been met. One of the main
components which was not undertaken was the Environmental Assessment hearing preparation which had been
budgeted for in 1979 but now will not occur until 1980. The over-expenditure at Ashbridge's Bay was due
to higher than expected costs of placing and maintaining aids to navigation. The over-expenditure at
East Point Park resulted from an approved addition to the work to be undertaken by the Authority's Master
Plan consultant, and the over-expenditure in land acquisition resulted from the Land Compensation Board's
decision on the Sunnypoint expropriation..
B-497
TO: The Chairman and Members of the Executive Committee, M.T.R.C.A.
Meeting #21/79 - Wednesday, January 23, 1980
FROM: T. E. Barber, Administr~tor, Information and Education Division
RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT - JANUARY 1 TO
DECEMBER 31, 1979
(a) INFORMATION
The Authority's information work is carried out under the Community and
Staff Relations Program, which is comprised of four components, namely
Administration, Conservation and Recreation Land Management Plan, Water
and Related Land Management Plan, and The Metropolitan Toronto and
Region Conservation Foundation.
Highlights Included:
- the production of 420,000 pieces of promotional literature describing
the general activities of the Authority, the recreational, educational,
and historical.facil~ties, and The Metropolitan Toronto and Region
Conservation Foundation;
- the distribution of approximately 315,000 copies of the Authority's
promotional literature;
- the completion of a variety of special printing projects, totalling
30,200;
- the Authority's participation, with the Convention & Tourist Bureau of
Metropolitan Toronto, in 300,000 copies of Superguide and 300,000
copies of the Attractions Brochure (both items promoting Black Creek
Pioneer Village) , as well as participation in the bi-monthly publica-
tion "Happenings", promoting the Authority's coming events. Also,
staff attends regular meetings of the Attractions Council of the
Convention & Tourist Bureau;
- news and photo releases, reflecting the Authority's and Foundation's
activities, have been written and distributed to media and School
Boards (total distributed - 54,830) ;
- samples of 1,660 press clippings, on all aspects of the Authority's
activities, have been received;
- a program of introducing the Kortright Centre for Conservation was
carried out in 1979, with the financial assistance of a grant from
National Museums Canada, including photo and news releases, filming,
and interviews. Two special press previews were carried out
at Kortright, on June 11th and 12th, to introduce the Centre to the
members of the media;
- two hundred and twenty-seven television promos (one-minute) , on the
related activities of the Authority during the four seasons, have
been distributed and are in use; -
- the exhibit program in 1979 consisted of exhibits at the Scarborough
Town Centre (for Canada Heritage Week) and at the Claireville Dam
(for the Spring tour). Exhibit materials were supplied to Black
Creek Pioneer Village staff for two displays. Also, the Authority's
participation at the Canadian National Exhibition, in "Metroshow",
went well. Staff designed and built the exhibit and based the
program on the theme of the 25th Anniversary of Hurricane Hazel and
the resource management activities of the Authority since;
- the production and distribution of 2,200 copies of three issues of
"Highlights" and 1,800 copies of three issues of "Inside" ;
- twenty-six special photo assignments have been completed during this
period;
- staff organized two Town Hall Meetings, which were held at the
Kortright Centre for Conservation on September 11th and 12th.
Minutes were distributed to the staff;
?
B..498
TO: Executive Committee, M.T.R.C.A. , #21/79 - January 23, 1980
RE: INFOR}~TION AND EDUCATION DIVISION - PROGRESS REPORT - JANUARY 1 TO
DECEMBER 31, 1979 Page 2
- three new one-minute colour public service films are now in progress
(one for the Kortrigbt Centre for Conservation - working copy); one
for Flood Control and Water Conservation - completed except for final
mix)~ and one for The Metropolitan Toronto and Region Conservation
Foundation - preliminary stages);
- a new program of postage meter identification stamps, relating to the
Authority's activities, was undertaken ~n 1979~
- complete arrangements were looked after for Arbor Day on May 8th,
the official opening of the Kortright Centre for Conservation on
June 2lst, and for the Bill Davidson's Day Garden Party at Black
Creek Pioneer Village on July 5th;
- a waterfront tour was arranged and carried out on July 9th for new
Federal Members of Parliament and a watershed tour, for new staff
members, was carried out on November 13th~
- distribution of Authority brochures and Valley Regulations was
completed, during the summer months, to all municipal offices and
many government agencies in the watershed;
- a committee has now been established to promote the Kleinburg and
Town of Vaughan areas. A program will get underway in the new
year;
- the Hurricane Hazel 25th Anniversary Seminar was held on Wednesday,
October 3rd in the Council Chambers, Toronto City Hall, and it
resulted in substantial press coverage;
- staff made Authority presentations to three service clubs in the
area.
(b) EDUCATION
All the Conservation and Outdoor Education Programs are operating near
capacity. In the period from January 1st to December 31st, 1979
4145 groups, representing some 103,618 individuals have participated.
(i) Albion Hills Conservation Farm
The farm at Albion Hills is now in full operation, with a program
established for both the field centre in-residence students and
outside students. These programs will be further developed
during 1980, to provide a broader perspective to a wider range of
students. .
(ii) Kortright Centre for Conservation
The Hon. Robert Welch officiated at the official opening ceremonies
on Thursday, June 21st, 1979. Over 900 people were present for that
occasion.
The Forestry, Fish and wildlife and Water Committees have completed
their reports. The Land and Energy Committees are expected to have
their respective reports finalized early in the new year. Of ten
exhibits scheduled to be designed and constructed by December 31st
1979, only one remains to be completed. There are seven additional
exhibits in various stages of design and construction, and their
completion is scheduled for June, 1980. The final phase of the
Exhibit and Display Program is ready for presentation to Wintario
in the near future.
Information and directional signs are now in place on all major
roads and highways leading to the Centre. The plan for the main
entrance and patio area was completed, with the work for the entrance
approximately 50% complete and the work for the patio 75% complete.
Ten kilometres of nature trails were also completed.
...3...
Executive Committee, #21/79 - January 23, 1980 B-499
TO: M.T.R.C.A. I
RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT ~
January 1 to December 31, 1979 Page 3
Throughout the year there have been approximately 11,000 students
involved in a variety'of education programs, all related to the
Kortright Centr'e themes. A group from Quebec, on an exchange basis,
visited the Centre to learn about resource management. Over 9,000
members of the general public have visited the Centre during the
year. Included are: seminar groups, business meetings and certain
special banquet groups.
The Fish and Wildlife Agreement between the Ministry of Natural
Resources and the Authority was updated in September, 1979 and it is
intended that this agreement be the model for any future agreements
drawn up between the Authority and a supporting Ministry of organi-
zation for further theme support.
(iii) Black Creek Pioneer Village - Education Programs
The education programs at Black Creek Pioneer village continue to be
popular, despite showing some of the effects of the present economic
situation and the specific economic situation in the Authority and the
School Boards.
While there was a decrease in attendance from 1978, the total number
of students participating in the village education programs is 60,000.
This includes a host of specialized groups such as the disabled, the
retarded, the deaf, the blind, the very new Canadians, etc. It is
interesting to note that 1979 saw the one millionth participant in the
Village education programs since their beginning, twenty years ago.
(iv) Lake St. George Conservation Field Centre
The opening of Lake St. George, Phase I, scheduled for the fall of
1979, will take place in January of 1980. The construction of Phase
II is well under way, with the dormitory shell scheduled to be
completed by the end of January. The student participation program
for Phase I was very successful and a similar program for Phase II
has been established, to commence in early February. Programs have
been designed, in conjunction with the participating Boards of
Education and are ready for implementation. A residential credit
course in the summer of 1980 is proposed, and is currently under
consideration.
(v) Conservation Field Centres
Albion, Boyd, and Claremont Residential Field Centres and Cold Creek
Day Centre were all beyond 90% occupancy in 1979. In addition to
regular programs, there were:
_ a camping program for first-time campers at Cold Creek~
_ credit courses for teachers and others in July, in cooperation
with York University and financially supported by a grant from
the Canadian National Sportsmen's Show, at Albion Hills:
- a specialized program, in cooperation with the United Synagogue
Day School (orthodox) , at Claremont;
- a program fo r the disabled, in cooperation with the March of
Dimes, at Claremont;
_ a special program for the Peel Regional Crossing Guards, in
cooperation with the Peel Regional police, at Albion Hills;
- a group of forestry students from the Faculty of Forestry,
University of Toronto, at Claremont;
_ a group of secondary level honour math and science students
from the Board of Education for the City of North York, at
Boyd:
...4...
B-500
TO: Executive Committee, l-!.T.R.C.A. #21/79 - January 23, 1980
RE: INFORMATION AND EDUCATION DIVIS,ION - PROGRESS REPORT -
January 1 to December 31, 1979 Page 4
- a program for the disabled, in cooperation with the Metro
Toronto Schools for the retarded, at Boyd~
- a group ,of English-as-a-Second-Language students from the
Metropolitan Separate School Board, at Boyd;
- a senior credit course (Grade 11-12) in archaeology, in
cooperation with the University of Toronto, the Board of
Education for the City of North York and the Ontario Ministry
of Education, at Boyd;
- a program specially designed for the "Junior Farmers", at
Boyd~
- several groups of girl guides, community groups and private
groups were accommodated at the various field centres.
(c) FINANCIAL COMMENTS
A. Operations and Maintenance - Community Relations
Expenditures and revenue are in line with budget estimates. At this
time, and with the preliminary figures available to us, it would appear
that there is a surplus of approximately $11,000.
It is anticipated that the operating deficit at Lake St. George, in the
amount of $18,500 can be offset from 1980 operating fees as agreed
between the participating School Boards and the Authority.
The deficit at Boyd, in the amount of $3,600 will be offset by a transfer
from the Boyd Trust Fund, made up of previous years' operating surpluses
from Boyd operations.
B. Water and Related Land Management - Community Relations
Program (W10)
Kortright Centre - FurniShings, Exhibits & Equipment
While only 57% of the budget, or $122,550 was spent on furnishings,
exhibits and equipment at the Kortright Centre for Conservation in 1979,
this expenditure was coincident with the cash flow available from the
Foundation and represents just over ~ the approved Wintario project of
$$233,319.
Lake St. George - Development
The development budget for Phases I and II, including additional
expenditures for corrective works related to the requirements of the
Ontario Fire Marshal, as approved by the participating School Boards,
amounts to $404,500. The expenditure of $324,040 includes the contract
commitments for the total contract. It is therefore estimated that the
major development in this project will be completed within the budget
estimate.
Conservation Information
Conservation Information is overspent by 2%, as a result of $14,069,
spent on Hurricane Hazel Seminar and the C.N.E. exhibit, not being
included in the original budget estimates for 1979.
Conservation Education
The overexpenditure of 3%, or $4,635, in Conservation Education represents
(a) the difference between preliminary budget estimates and actual
approved salaries~
(b) a minor adjustment for holiday credits to the Supervisor of the
Kortright Centre, as recommended by the Personnel Sub-Committee
and approved by the Executive Committee; and one month of his
salary.
...5...
B-50l
A. OPERATIONS AND MhINTENANCE - COMMUNITY RELATIONS
Information and Education Division Operations
Expenditures Expenditures to Expenditures
1979 Budget December 31, 1979 % of Budget
$874,113 $173,250 88%
Revenue Revenue to Revenue
1979 Budget December 31, 1979 % of Budget
$757,700 $667,806 88%
B. WATER AND RELATED LAND MANAGEMENT - COMMUNITY RELATIONS
- PROGRAH (WIO)
1979 Expenditures Expenditures
Budget Dec. 31, 1979 % of Budget
-
Albion Hills 7,000 5,454 78%
KCFC - Area Development 76,000 76,252 lOOt
- Furnishings,
Exhibits and
Equipment 216,472 122,550 57%
LSG - Development 260,722 324,040 124%
(Phases I & II)
560,194 528,296 94%
Cons. Information 85,500 87,700 102%
Cons. Education 153,500 158,135 103%
C. CONSERVATION AND RECREATION LAND MANAGEMENT --
CONSERVATION AREA INFORMATION AND INTERPRETIVE PROGRAM (C3)
1979 Expenditures to Expenditures
Budget December 31, 1979 % of Budget
$21,000 $22,706 108%
TEB/mrp
1980.01.16
B-502
TO: Executive Committee, M.T.R.C.A., #21/79 - January 23, 1980
RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT -
January 1 to December 31, 1979 Page 5
-
C. Conservation and Recreation Land Management -
Conservation, Area Information and Interpretive Program (C3)
The overexpenditure of $1,706 was a result of substantially greater
attendance than anticipated at Arbor Day, Bill Davidson's Day Garden
Party and the Kortright Centre official opening.
INFORMATION AND EDUCATION OPERATIONS
JANUARY -- DECEMBER 1979
CONSERVATION EDUCATION
PROJECT GROUPS PARTICIPANTS PARTICIPANT DAYS TEACHERS ACCOMP.CLASSES ,STUDENT TEACHERS TEACHER DAYS
Conservation Field Centres: 21 705
Albion Hills 81 , 2,697 8,599 229
Claremont 89 2,942 9,938 240 27 723
Boyd 91 2,994 10, 130 204 10 726
Lake St. George
Cold Creek - Day Programs 184 6,236 6,236 370 6 370
Cold Creek - Camping Program 15 369 33
Black Creek P~o~eer Village
Educatlonal Tours 2,483 50,089 5,148
P~onetr Life Program 276 9,799 570 3
Kortright Centre for Conservation
Publ~c 40 days 6,657
Edu~at~onal Programs 242 10,864 513
Other 42 2,675
Bruce's t'lill
Educational Programs 139 6,377 310
Clairville Dam
Educat~onal Programs 25 1,169 55
Public 2 days 215
\~atershed Tours 6 183 6
Albion Hills
Educat~onal Programs 14 352 33
Total 103,618 34,903 7,711 67 2,524
I
tJ1
I
U1
0
l.o.I
B-504
CONSERVATION LAND MANAGEMENT DIVISION
PROGRESS REPORT
JANUARY 1 - DECEMBER 31, 1979
The following progress report has been prepared on the basis
of the various program activity in the Regional Municipalities.
REGION OF PEEL
Conservation Services
In 1979, 55% (65,120) of the reforestation seedlings planted
for private lando~ners were planted in this region. Under the Private
Landowner Farm Tree and Shrub Program, 2169 trees and 5368 shrubs
were planted. A total of 31,200 reforestation seedlings and 4,800
trees and shrubs were planted on Authority lands at Glen Haffy,
Claireville, Heart Lake Conservation Areas and the East Palgrave
Forest and Wildlife Area, (Gibson Lake).
Plantation management reports were prepared for three Authority
properties in Peel, as well as one biophysical inventory of the
Claireville Conservation Area. Woodlot Management programs were
carried out at Glen Haffy, Heart Lake and Claireville Conservation
Areas and the East Pal grave Forest and Wildlife Area.
One stream improvement project was carried out under the S.P.O.F.
program and two projects under the Authority's stream improvement
program on private lands.
Conservation Area Development
The Authority's major Conservation Area Development in Peel
took place in the Albion Hills Conservation Area. In the campground
a combined office and residence building was constructed to provide
24 hour supervision for the campground. This structure will be
in operation for the opening of the 1980 camping season. As well,
at Albion Hills, a new footbridge was constructed providing access
to picnic areas on the north side of the Centreville Creek adjacent
to the swimming area. The bridge will also be used during winter
months by cross country skiers.
At the Heart Lake Conservation Area an additional section of
perimeter fencing was added to further secure the area and prevent
unauthorized access.
In the Glen Haffy Conservation Area, the fish rearing program
was continued.
- 2 - B-505
REGION OF PEEL (cont'd)
Operations
During the winter, Albion Hills, Claireville, Heart Lake
and Palgrave Conservation Areas were open for winter activities.
The Albion Hills ski program operated at capacity and the improved
trails at Palgrave were well used. In preparation for the corning
season program staff have been hired and replacement equipment
obtained. A total of 57 groups have booked time in the Albion Hills
ski program.
On May 13, 1979 , an Open House was held at the Claireville
Conservation Area to launch the Authority's new Canoe Instruction
and Rental Program. The program operated from May 19 to September 18.
As part of the Visitor Services program, a promotional brochure and
flyer were circulated to schools, day camps, youth groups and sports
stores. Thirty-two groups attended day instructional sessions.
Three weekend courses and two evening courses held were well attended
by the general public. The weekend rental demand for the l6 canoes
and 8 rowboats was at or near capacity. The strong response to this
program by the general public, school and organized groups resulted
in a very successful summer program.
Conservation Area facilities were in high demand by organized
groups with a total of 280 picnic reservations and 6 day camps booked
in the areas in the Region of Peel. Again this year the Experience
Program played an important role in helping maintain Conservation
Areas. Nineteen students were employed in this region's conservation
areas. Conservation Area swimming facilities were extremely busy
throughout the summer. Unfortunately, despite the excellent work
performed by our lifeguard staff, there was a drowning fatality at
the Claireville Conservation Area. Attendance at the Indian Line
Campground was excellant with the campground at or near capacity
particularly during August. During the fall, Conservation Area staff,
in co-operation with the Property Division completed property line
fencing at the Palgrave Forest and Wildlife Area.
B-506 - 3 -
RE~~OFro~
Conservation Services
In York, 30,400 reforestation seedlings, 2,409 farm trees and
4,705 wildlife shrubs were planted for private landowners. On
Authority lands, 15,900 seedlings, 1,700 farm trees and shrubs were
planted at Boyd and Lake St. George.
On Authority lands in York Region, two stream improvement
projects were completed at Humber Trails and the Kortright Centre.
On private lands, two projects were completed with approximately
200 meters of stream improved. Woodlot management projects were
carried out at the Boyd and Bruce's Mills Conservation Areas as well
as Lake St. George. A biophysical inventory was carried out at the
Boyd Conservation Area.
Conservation Area Development
In York, at the Cold Creek Conservation Area, a Trap Range
Control Building was constructed which will provide for ammunition
storage, increased control of the use of the trap ranges, minor
refreshment facilities, washrooms and warming area. In conjunction
with this building, a 60 car parking lot was constructed. The
building will be open in February with adjacent landscaping to be
completed in 1980. The Rifle Range at Cold Creek was improved
following consultation with the Ontario Provincial Police. These
improvements will increase the visitor safety in the area. Materials
were acquired for the construction of a new gatehouse to replace a
temporary structure now in use.
At the Bruce's Mill Conservation Area, a number of small
improvements were made to the area including the installation of
plexiglass windows in the pancake pavillion. Eighty square meters
of interlocking pavement was acquired for installation around the
maple syrup shack which will improve the area during spring use.
The major development item at Bruce's Mill was the completion of
the mill foundation. This work will reduce the unauthorized access
to the building and will significantly enhance the structure.
Operations
During the winter, Boyd, Bruce's Mill and Cold Creek Con-
servation Areas were open for winter activities. The Bruce's Mill
Ski program operated below capacity but this situation is expected
to improve as the area becomes better known. In this connection a
well attended Open House was held on December 9, 1979 to publicize
the area facilities. Significant improvements were made to the
Cold Creek Ski Trails at the beginning of the year and further trail
improvements were carried out in the fall.
- 4 -
B-507
REGION OF YORK ( con t ' d)
Operations (cont'd)
In preparation for the upcoming season, Bruce's Mill ski
program staff have been hired, replacement equipment obtained and trail
improvements carried out. Twenty-six groups have booked reservations
in the ski program.
The Maple Syrup demonstration at Bruce's Mill Conservation Area
was well attended with school groups and general public visits up 900
and 2,300 respectively over the 1978 program. Conservation Area
facilities were in high demand by organized groups with a total of
267 picnic reservations and lO day camps booked in the York Region
Conservation Areas.
This year's Experience Program again played an important role
in maintaining Conservation Areas with 10 students employed in the
Region's Conservation Areas. Area swimming facilities were very busy
during the summer. An upstream sewage treatment plant spill on the
east branch of the Humber River resulted in closing the Boyd swimming
area for approximately 2 weeks in early August. This seriously affected
the Boyd Area attendance.
During the fall, property line fencing was completed at the
Nashville Reservoir in co-operation with the Property Division.
Construction of a model airplane landing strip was completed at the
Cold Creek Conservation Area in preparation for the use of this site
by a club commencing in the spring of 1980.
B-508 - 5 -
REGION OF DURHAM
In Durham, 27,700 reforestation seedlings, 135 farm trees and
llO wildlife shrubs were planted on private lands. 2,900 seedlings and
120 trees were planted at the Glen Major Forest and Wildlife Area
as part of a gravel pit rehabilitation project. Woodlot management
and a biophysical inventory were carried out at the Greenwood Con-
servation Area this year. A tree maintenance program was carried
out at the Petticoat Creek Conservation Area.
As part of the S.P.O.F. program, approximately 1,800 meters
of stream were improved through projects of bank stabilization,
fencing and buffer plantings. Eight projects were completed in
Durham on the Duffin Creek.
Conservation Area Development
In Durham, the major activity took place in the Greenwood
Conservation Area where three footbridges were ~nstalled by area
staff . These bridges provide access to a day camp area, the nature
trail and will connect existing snowmobile trails.
Operations
Greenwood, and for the first time, Claremont Conservation Area,
were open for Winter activities. At Claremont, the improved ski
trails were well used. This fall, further improvements were completed
on the ski trails at Claremont and the snowmobile trails at Greenwood.
During_the summer, Conservation Area facilities were in great
demand by organized groups with 186 picnic reservations and B day camps
booked in the Region's Conservation Areas. This year's Experience
Program had B students employed in the maintenance of Conservation
Areas. The Petticoat Creek Area pool winterizing procedures were
again successful and the pool opened on time. However, it was
necessary to close the pool on a number of occasions during the
summer due to mechanical breakdown in the plumbing and filtering
equipment. Repairs were carried out this fall in co-operation with
the Water Resource Division, Water Front Section. Conservation Area
staff completed property line fencing at the Glen Major Forest and
Wildlife Area in co-operation with the Property Division.
- 6 - B-509
MONO/ADJALA
Twenty-three thousand reforestation seedlings and 205 farm
trees were planted for private landowners. One stream improvement
project was carried out under the S.P.O.F. program on private lands.
GENERAL
Conservation Services
Stream assessment was carried out on the headwaters of the
Humber River to study the cold water streams for fish habitat im-
provement.
One reforestation subsidy was approved for a landowner in
Durham Region for the planting of l5,000 reforestation seedlings.
Approximately 80 site visits were carried out throughout the
watershed for technical advice on land management concerns. Eight
farmland rentals of Authority owned lands were reviewed for: the
purpose of updating and reviewing the leased.
Landscape projects in 1979 included the Kortright Centre for
Conservatio~ rehabilitation of the Petticoat Creek Collector Sewer
Line and the first phase of the landscape development project at
the South Thackeray Sanitary Landfill Site. A tree maintenance
project was also carried out at Humber Bay East Waterfront Project.
Re-vegetation and bank stabilization were carried out on one
site in York Region in conjunction with the Flood Control Section under
the Peel, York, Durham, Erosion Control Project.
Approximately 740 trees and 6,000 shrubs were supplied to
the Flood Control Section for their revegetation program in Metro-
politan Toronto.
The Authority nursery program expanded this year and will
continue to do so. Thirty-three thousand shrubs and 10,000 trees
and 700 calibre trees were supplied to private, public and Authority
programs.
A total of 200 trees were moved for private landowners within
the watershed under the Private Tree Spade Rental Program. One
conservation plan was completed this year.
B-5l0 - 7 -
GENERAL (cont'd)
Conservation Area Development
A handout Visitor Survey was carried out in the Conservation
Areas using 3 Experience '79 Students. Results from the summer survey
are complete and include information on visitor origin, group size,
activity preferences and cross visitation between conservation areas.
The comments received from the visitors are of value in the ongoing
operations and planning of the Conservation Areas and will be
available in February.
In April of 1979, the Interim Conservation and Recreation Land
Management Plan was presented to the Conservation Land Management
Advisory Board. Following receipt of the draft plan by the Authority
it was circulated to the Province of Ontario and to the Authority's
member municipalities. Staff are currently reviewing this component
for inclusion in the Watershed Plan.
Operations
The 1979 winter ski season was shorter than previous years
due to lack of snow in early January and late December. This combined
with cool early spring weather resulted in a decrease in attendance
despite an increased attendance during the summer period.
Of interest is the fact that 36 of the Special Passes distributed
at the 1979 C.N.E. were redeemed at Conservation Areas.
The attached table compares 1979 and 1978 individual Con-
servation Area attendance figures. In 1979 attendance decreased 87,868
or 8%.
- 8 - B-511
Attendance at Conservation Areas
C.N.E. 1979 1978
PASSES
- -
PEEL
Albion Hills 0 158,734 194,955
C1aireville 0 101,888 94,010
Glen Haffy 11 63,170 54,25l
Heart Lake 7 112,117 133,288
Palgrave 0 6,018
Indian Line 0 49,952 43,512
492,479 520,016
YORK
Boyd 3 158,964 193,655
Bruce's Mill 7 185,780 198,836
Cold Creek 1 37,456 46,943
Humber Trails 0 4,263 3,740
WOOdbridge 0 12,233 15 , 9 36
398,696 459,110
DURHAM
Claremont 2 29,090 31,733
Greenwood 1 57,231 61,019
Petticoat Creek 4 98,832 92,318
185,153 185,070
TOTAL ATTENDANCE: 36 1,076,328 1,164,196
B-5l2 - 9 -
FINANCIAL COMMENTS
The financial comments and figures below relate to the
information supplied through the Finance Division on the pre-
liminary assessment of the year end financial statements.
FINANCIAL STATEMENT - JANUARY - DECEMBER 1979
YR. TO mTE '!UrAL , BUD.:E1'
EXPEND. CDMMIT . APproX. ~ USED
Cbns. Areas
D;!veloFlfEl1t 268,602 4,425 273,027 270,000 101
.
Cbns. Areas
Operations 1,394,291 5,561 1,399,852 1,370,800 102
Rmt & Utility
Services '39.143 - .39,143 39,000 100
Private Land
Program 119,028 565 119,593 113,000 106
Authori ty Land
Program 89,610 - 89,610 95,000 94
Cbns. Areas
~venue 750 ,619 - 750,619 710,000 106
Private Land
~venue 14,978 - 14,978 15,000 100
Financial Comments
The Private Land Assistance programs were very active in 1979
and completion of projects resulted in an over-expenditure. Revenues
from Private Land programs were on target. The overspending in the
Private Land programs was offset by a reduction in spending on Authority
Land Programs.
Conservation Areas Development overspending was a result of the
Albion Hills and Cold Creek buildings actual construction costs exceeding
budget estimates. This overexpenditure will be picked up by Conservation
Areas operations ,unless additional funding is available from the Province.
Conservation Area Operations spending exceeded budget estimates.
This was a result of obtaining several items at year end which were not
included in the original estimates. This overspending was possible
because of excess revenue obtained which more than offset excess spending.
h
SCHEDULE "B"
B-513
TO: The Chairman and Members,
Executive Committee, M.T.R.C.A. , #21/79.
FROM: K.G. Higgs, Secretary-Treasurer.
RE: REPORT #7/79
-PERSONNEL SUB-COMMITTEE
THE COMMITTEE RECOMMENDS THAT:
1. The Property & Administration Division and the Finance Division be
amalgamated; and
THAT the "Function of the Finance and Administration Division", as
attached as Appendix 1 hereto, be approved, effective January 23, 1980.
.
2. The position description "Director of Finance and Administration", as
attached as Appendix 2 hereto, be approved.
3. The following appointment be made to the Full Time Staff:
Name Posi tion Leve 1 Effective Date
W.E. Jones Director of Finance and 11 January 23, 1980
Administration
4. In view of the decision to amalgamate the Property & Administration
Division and the Finance Division, the following appointment to the Full
Time Probationary Staff be terminated:
Name Position Level Effective Date
G. Dudar Administrator of Finance lO January 23, 1980
Attach.
1980.01.21.
B-514
Function of: The Finance and Administration Division IPa~e: K-l
The responsibilities of the Division encompass financial
management of the Authority and monitoring of financial
procedures to support the goals of the Authority.
The Division is responsible for acquisition and management
of property, management of Authority legal services,
management of the Authority's Administration offices and
grounds, and provision of administrative services to all
Divisions of the ~uthority. Individual responsibili ties
are as follows:-
.
- compilation of the annual Authority budget in co-
operation with the Secretary-Treasurer, the
Director of Planning & Policy and all Divisions
of the Authority
- compilation of the multi-year forecast in co-
operation with the Secretary-Treasurer, the
Director of Planning & POlicy and all Divisions
of the Authority
- accounts payable
- accounts receivable
- payroll
- auditing
- inventory control
- systems analysis
- personnel administration
- miscellaneous services related to accounts and
record keeping
- acquiring of property ,and property rights
- leqal services
- maintenance of Authority's Administrative
Offices and grounds
- all insurance
- central mailing
- duplication
- stationery, office supplies, furniture and
equipment
- reproduction of agendas, minutes and reports
for all Authori ty, Executive and Advisory Board
meetings
B-515
Division: Finance and Administration rAGE: L-3
POSITION: Director EXECUTIVE r
DATE:
CI.i\SS. LEVEL: 11 RESOLUTI ON .
TERMS OF REFERENCE
The Director of Finance and Administration is responsible to the Secretary-Treasurer
for the financial management of the Authority, the administration of the Authority's
personnel policy, is Deputy-Treasurer and a signing officer of the Authority, is
responsible for the acquisition and management of property, mana~ement of the
Authority's legal services, management of the Authority's Administrative Offices and
grounds, and provision of administrative services to all Divisions.
Individual responsibilities are as follows:-
- establishmen~ co-o~dination and monitoring of the Authority's system of financial
management
- supervision of all accounting, banking, auditing and financial reporting and
information procedures
- supervision of payroll and personnel administration functions
- compilation of the Authority's annual budget estimates and multi-year forecasts in
co-operation with the Secretary-Treasurer, Director of Planning and Policy and all
Divisions of the Authority
- liaison with the Authority's bankers, auditors and representatives of the
Provincial and Federal Governments and Member Municipalities, regarding financial
matters
- receiving property plans and instructions from Authority Divisions charged with the
responsibility of designating lands or property rights for acquisition
- initiating, developing, recommending and implementinR policy and plans to meet the
property needs oC The Me tropoli ta n Toron to and Region Conservat ion Authorf ty
- developing and implementing plans and programs for property management, ine! ud inR
the Administrative Head Office
- maintaining all records concerning property, including land survey plans. assess-
ments, taxation, insurance, leases, rentals, deeds, agreements, Ontario Municipal
Board applications and including all legal documents
- instructing the Authority's solicitors in all matters requiring legal assistance
- assisting all Divisions with legal matters, including preparation of agreements
and other documents as required
- supervision of the Authority's duplicating and mailing operations
- co-ordination of the Authority's insurance requirements, including maintenance of
insurance records and processing of claims
- provision of all stationery, office supplies, furniture and equipment
- operation of the Authority switchboard
- supervision of the use of the Authority's printing and mailing equipment
- duplication and distribution of all Authority, Executive and Advisory Board
agendas, minutes and reports
QUALIFICATIONS AND EXPERIENCE
- a sound background of financial, accounting, auditing and management practices
- a thorough knowledge of general administration procedures
- an ability to prepare concise and accurate reports
- an ability to work effectively with other persons in rclnted and unrelnted
disc I pI illL's.