Loading...
HomeMy WebLinkAboutExecutive Committee 1979 ~ B-1 , the metropolitan toronto and region conservation authority minutes REPORT #1/79 EXECUTIVE COMMITTEE WEDNESDAY-FEBRUARY-14-1979 #1/79 The Executive Committee met in the Board Room. Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, February 14, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar ~.J. Breen Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline Dr. T.H. Leith J.S. Scott H.G. Westney Authority Member R. Gillespie Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Hanagement Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & policy Mrs. A.C. Deans Head, Conservation Education Section, I&E Miss A. Hayhoe Planning Technician, Planning & Policy B.E. Knox Development Co-ordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather Supervisor, Accounting Services, FD Mrs. M. Mosseau Senior Administrative Secretary Mrs. M. Mitchell HEARING: Following the Roll Call, the Meeting recessed to hold a Hearing re: Town of Caledon Humber River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott H.G. Westney Authority Member R. Gillespie Secretary-Treasurer K.G. Higgs Director of Planning, & Policy l'1 .A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Si'tes Division R.K. Cooper Adm. - Conservation Land Manaaement Division P.B. Flood B-2 -2- . .. ' PRESENT FOR THE MEETING (Contd. ) Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Executive Secretary Mrs. K. Conron Research Planner, Planning & Policy Mrs. A.C. Deans Head, Waterfront Section, WRD B.E. Denney Head, Conser.v.a~ion Education Section, HE Miss, A. Hayh~e. Planning Tec~nician, Planning & Policy B.E. Knox' Development Co-ordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD .. J.C. Mather Senior Administrative Secretary ,Mrs. M. Mitchell Supervisor, Accounting Services, FD Mrs. M. Mosseau Supervisor, Property Administration, P&A D.J. Prince Project Engineer - Development, F.C. , WRD A.G. Saha,bandu ABSENT WERE Members E.H. Card Mrs. S. Martin MINUTES The Minutes of Meeting #22/78 were presented. Res. U Moved by: Mrs. F. Gell Seconded by: H.G. Westney RESOLVED THAT: The Minutes of Meeting #22/78, as presented, be adopted as if read. CARRIED; SECTION I THE EXECUTIVE COMMITTEE SUB~IITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: l. 1979 BUDGET ESTIMATES Mr. Scott presented the 1979 Budget Es~imates. Res. #2 Moved by: Mrs. J.A. Gardner Seconded hy: M.J. Breen RESOLVED THAT: The 1979 Budget Estimates, as amended and appended as Schedul~ "A" of these Minutes, be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 General Budget Estimates and 1979 Capital Program, dated February 14, 1979, be adopted; and further in this connection, that the following action be taken: (a) All current projects included in the 1979 General Budget Estimat~s be approved and adopted; and (b) WHEREAS the Conservation Authorities Act provides 'that for the carrying out of any Project, an Authority shall have the power to determine the portion of total benefit afforded to all municipalities that is afforded to each of them, The Metropolitan Toronto and Region Conservation Authority therefore enacts as follows: ( i) That all mernber,municipalities be designated as benefiting for all General Current Projects included in the 1979 General Current Budget; (H) The Authority's share of the cost of all General Current Projects included in the 1979 General Current Budget, as set forth in the 1979 General Current Budget shall be raised from all member municipalities as part of the 1979 Annual General Levy; (Hi) The 1979 Annual General Levy for Administration, Operations and Maintenance Programs, Conservation and Recreation Land Manage- ment an~ the current programs of Water and Relate~ Land Manage- ment, be apportioned to the participating municipalities in the portion that the equalize~ assessment of ' the municipalities or -3- B-3 part bears to the equalized assessment of the whole area under the jurisdiction of the Authority, unless otherwise provided in the LeVYi (iv) The appropriate Authority officials be instructed to advise all municipalities pursuant to The Conservation Authorities Act and to levy the said municipalities the amount set forth in the 1979 General Current LevYi (v) . The Executive Committee be authorized to reduce the said Budget and Levy, should such action be deemed expedienti (c) The 1979 Capital Works Program and the 1979 Capital Levy for Projects included therein and dated February l4, 1979 be adoptedi and WHEREAS The Conservation Authorities Act provides that an Authority may, from time to time, determine what monies will be required for Capital expenditures in connection with any project, and further provides for the method of raising such monies from the participating municipalities, THAT the following action be taken: (a) All member municipalities be notified of the amount of such monies they arc required to raise in 1979, on the basis set forth in the 1979 Capital Works Program and Levies for: (i) The Interim Water and Related Land Management Project 1979-l98li (ii) Th~ Metropolitan Toronto and Region Waterfront Project 1977-1981, proposed to be carried out in 1979i (iii) Project W.C.-58 - A Project for Erosion Control and Channel Improvements on the West Branch of the Don River between Ba~lurst Street and Finch Avenue - The Municipality of Metropolitan Toronto benefiting. (b) The appropriate Authority officials be instructed to advise all municipalities pursuant to The Conservation Authorities Act, and to levy the said municipalities the amounts set forth in the 1979 Capital Works Levies. CARRIEDi 2. APPOINTMENTS TO FUNCTIONAL ADVISORY BOARDS AND EXECUTIVE SUB-COMMITTEES - 1979 The Chairman presented a communication having regard to appointments to Functional Advisory Boards and Executive Sub-Committees, advising that the recommendations were based on indicated preferences, where possible, on Authority regulations, and in accordance with new rules adopted by the AuthoritYi and further advising there are 5l members of the Authority and five advisory boards. The maximum number permitted for each Board is 14. The Chairman and Vice Chairman of the Authority are ex-officio members of all Boards and Committees. Res. #3 Moved by: E.V. Kolb Seconded by: J.S. Scott RESOLVED nIAT: The communication of the Chairman having regard to the appointments to the Functional Advisory Boards and Executive Sub- Committees for 1979, as amended, be receivedi and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Members recommended to the various Functional Advisory Boards and Sub-Committees be as indicated and that per diem and mileage be allowed for attendance at meetings: (a) CONSERVATION LAND MANAGEMENT Chairman: Kolb, E.V. Appointees: Bell, R.E. Vice Chairman: Barber, Wm. G. Bryson, J.A. Members: Caldwell, S. Gardhouse, G. Fitzpatrick, R. McDermott, N. Gillespie, R.S. Henderson, Gavin B-4 -4- (a) CONSERVATION LAND ~~AGEMENT (Contd. ) Members: King, E. Macpherson, S .A. McCreary, K. Yuill. R.F.M. (b) FLOOD CONTROL & NATER CONSERVATION Chairman: Scott, J.S. Appointees: Martin, L. Vice Chairman: Herridge, t'1m. R. ,QC Swann, Wm. Members: Bean, R.F. Bell, Mrs. C. Coutlee, K. Fleet, D.G. Fisher, G. Kline, C.F. McKechnie, F.J. Stewart, M.M.R. Tonks, A. Westney, H.G. (c) HISTORICAL SITES Chairman: Biggar, M.W.H. Appointees: Bradshaw, J. Vice Chairman: Perkins, F.R. Davidson, W.C.,QC Members: Jessop, C. Langdon, J.E. Moran, R.A.P. McGinnis, J .A. Starr, R. McMeans, Mrs. C. Walker, Mrs. A. Neil, Mrs. E. Russell, Dr. L. S . Scott, Dr. J.W. (d) INFORMATION AND EDUCATION Chairman: Leith, Dr. T.H. Appointees: Brown, C.G. Vice Chairman: Tovell, Dr. W. M . Downing, J. Members: Card, E.H. D\1nlop, J. Di Giannantonio, D. James, R.L. , Prof. Hancey, Mrs. L. Nelligan, B.E. Johnson, J.D. Johnson, R.W. Singh, B.V. Williams, G.A. (e) WATERFRONT Chairman: Breen. M.J. Appointees: Norton, G. Vice Chairman Ki tchen, D. Pickett, P.B. , QC Members: Brown, F.J~ Gardner, Mrs. J.A. Lipton, M.D. Marshall, Mrs. V. Martin, Mrs. S. Pownall, Mrs. N. Sinclair, B. Sutherland, Mrs. B. Trimmer, Mrs. J. White, D. EXECUTIVE SUB-COMMITTEES PERSONNEL Chairman: Hancey, Mrs. L. Members: Breen, M.J. Kolb, E.V. Leith, Dr. T.H. Martin, Mrs. S. FINANCE Chairman: Scott, J.S. Members: Biggar, M.W.H. Card, E.H. Gardner, Mrs. J.A. Kline, C.F. -5- B-5 RECOGNITION Chairman: Gardner, ~trs. J.A. Members: Perkins, F. Stewart, M.M.R. CONSERVATION Chairman: Kolb, E.V. FARM Members: *Bell, R.E. Caldwell, S. Leith, Dr. T.H. *Lowe, G. *Redelmeier, F.M. *Wall, A.A. *Denotes Appointment by Authority EMPLOYEE SUGGESTION AWARD COMMITTEE Chairman Hancey, Mrs. L. CARRIED 7 In accordance with Rule #6 - Rules for the Conduct of the Authority - Resolution #88/75, as amended, biographies of persons recommended for appointment to functional advisory boards are appended as Schedule liB" of these Minutes. 3. SUPPLEMENTARY PROJECT TO THE METROPOLITAN TORONTO AND REGION WATERFRONT PROJECT: 1977-l98l A staff communication was presented advising that by Resolution #7l/78 (Meeting #5/78), the Authority adopted the above project as follows: "Res. #71 RESOLVED THAT: Section I of Report #15/78 of the Executive Committee be received; and that the recommendation as contained therein and set forth herein be adopted: l. Report #2/78 Waterfront Advisory Board #2 ~IAT the Supplementary Project to The Metropolitan Toronto and Region Waterfront Project: 1977-l98l, as appended as Schedule "A" of the Minutes of the t'llaterfront Advisory Board Meeting #2/78, be adopted; and THAT the following action be taken: (i) The Municipality of Metropolitan Toronto and the Province of Ontario be requested to approve the Supplementary Project to The Metropolitan Toronto and Region Waterfront Project 1977-1981; (ii) The Municipality of Metropolitan Toronto be designated as benefiting municipality for the Supplementary Project in the amount of $496,000.00 for each of the years 1979,1980 and 1981; (iii) The Province of Ontario be requested to approve a grant of 50% of the costs associated with the Supplementary Project for each of the years 1979, 1980 and 1981; (iv) The Municipality of Metropolitan Toronto be requested to join with the Authority in its endeavour to obtain the 50% grant for the Supplementary Project from the Province of Ontario. CARRIED. A Funding for the Supplementary Project was proposed on the following basis: Province Metropolitan of Year Toronto Ontario TOTAL 1979 $ 496,000. $ 496,000. $ 992,000. 1980 $ 496,000. $ 496,000. $ 992,000. 1981 $ 496,000. $ 496,000. $ 992,000. B-6 -6- The Supplementary Project provides for the continuation of work provided for in the Waterfront Project, displaced as a result of the acquisition of the Guild Inn property in 1978, including the high priority shoreline management work along the Scarborough Bluffs. The Authority is now in receipt of MA 19/79 setting out the Minister's approval of grants for 1979. This approval provides for a $l,400,000.00 grant for the Waterfront which does not include the requested grant for the Supplementary Project. The l-tinister advises that no further funds will be available in 1979. Based on this information from the Province, The Municipality of Metropolitan Toronto has deleted its share of the 1979 portion of the Supplementary Project from its 1979 capital estimates, but has retained the 1980 and 1981 portions in its capital estimates. The Authority's 1979 Budget Estimates have been revised to reflect the diminished grants available. Priorities have been adjusted to provide $450,000.00 for shoreline management in 1979. At Meeting #l/79 of the Authority, the following resolution was adopted: "RESOLVED THAT: This Authority direct its Executive Committee to communicate to the Province of ontario, The Municipality of Metropolitan Toronto and the Borough of Scarborough its desire to discuss the disposal of a portion of the Guild Inn property in order to finance the continuation of the Authority's waterfront erosion control program. CARRIED;" That the sale of the Guild Inn property to finance shore management works can be contemplated demonstrates the urgency of the shore management problem. The modifications made to the 1979 budget alleviates some of tqe concern, but is, at best, an interim measure, and leaves in an unfinished state other waterfront works now in progress. While there is little possibility of additional provincial funding in 1979, the Supplementary Project should be acted on for 1980 and 1981. Res. #4 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff communication having regard to the Supplementary Project to The Metropolitan Toronto and Region Waterfront Project: 1977- 1981 be received; and THE EXECUTIVE COMMITTEE RECO~~ENDS THAT: The Minister of Natural Resources, The Municipality of Metropolitan Toronto and the Borough of Scarborough, be advised of Authority Resolution #32/79: "RESOLVED THAT: This Authority direct its Executive Committee to communicate to the Province of Ontario, The Municipality of Metropolitan Toronto and the Borough of Scarborough its desire to discuss the disposal of a portion of the Guild Inn property in order to finance the continuation of the Authority's water- front erosion control program." IT IS FURTHER RECOMMENDED THAT: The Minister of Natural Resources be requested to approve the Supplementary Project to The Metropolitan Toronto and Region Waterfront Project 1977-l98l, and the payment of grants requested therein for the years 1980 and 1981. CARRIED; SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING 1\C'l'ION TAKEN ON ITEMS 1\DOPTED BY TilE EXECUTIVE COMtUTTEE: 4. DECISION OF HEARING Town of Caledon Humber River Watershed Res. #5 Moved by: C.F. Kline Seconded by: M.J. Breen -7- B-7 BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 14th day of February, 1979i and THAT the application by the Town of Caledon, in accordance with Ontario Regulation 735/73, for approval in principle to reconstruct the First Bolton Scout Hut on the land of the Bolton Community Conservation Centre in Bolton, on Pt. Lot 9, Concession 6, village of Bolton, Town of Caledon - Humber River watershed - be deferred until such time as the required hydrological information is available. CARRIEDi 5. APPOINTMENT TO EXECUTIVE" SUB~COMMITTEE: 1979 Res. #6 Moved by: Mrs. J.A. Gardner Seconded by: Mrs. L. Hancey RESOLVED THAT: Mr. Harvey Higgins be appointed to the Kortright Centre for Conservation Special Committee on Energy. CARRIEDi 6. THE REGIONAL MUNICIPALITY OF YORK -Meeting with Council The Chairman presented a communication having regard to the suggestion of the Chairman of The Regional Municipality of York, at the Inaugural Meeting of Regional Council, that Council meet informally with local 'Councils within the Region to discuss local and regional issues. In accordance with this suggestion, Mr. Henderson indicated to Mr. Forhan that it would also be appropriate for Regional Council to hold an informal meeting with the Conservation Authority to discuss conservation issues in the ~egion. Council has indicated its full agreement with the suggestion. Res. #7 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The Executive Committee, together with the Members of The Metropolitan Toronto and Region Conservation Authority appointed by The Regional Municipality of York, and the senior staff, hold an informal meeting at the Kortright Centre for Conservation on Wednesday, April 25, 1979. CARRIEDi 7. FINANCIAL REPORT AND ACCOUNTS -December, 1978 (Final Report) Mr. Scott presented the Financial Report and Accounts for the month o~ December, 1978. Res. #8 Moved by: J.S. Scott Seconded by: E.V. Kolb RESOLVED THAT: The Financial Statement for the month of December, 1978, as amended, be receivedl and the Authority Accounts in the amount of $2,302,598.04, being (a) Current Expenditures - Wages and Salaries $266,836.661 Materials and Supplies $437,96l.371 (b) Capital Expenditures - Wages and Salaries $22,826.l41 Materials and Supplies $1,574,973.87, be approved for payment. CARRIEDi 8. APPLICATION FOR PERMIT UNDER O.R. 735/73 Bell Canada To cross a tributary of the Rouge River with proposed buried conduit, just south of victoria Avenue, east of Kennedy Road, Town of Markham A staff communication was presented advising that an application has been received for a permit to cross a tributary of the Rouge River with a buried conduit at the above location. Res. #9 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Bell Canada be received 1 and B-S -8- THAT the applicat,ion of Bell Canada for a permit to cross a tributary of the Rouge River with a proposed buried conduit in the area just south of Victoria Avenue, east of Kennedy Road in the Town of Markham in The Regional Municipality of York (Rouge River watershed), be approved, subject to: (a) All areas disturbed due to construction being restored to the satisfaction of the Authority: (b) The Town of Markham engineers being satisfied with the proposed restoration works: (c) Every effort being made to minimize the silting of the river during construction. CARRIED: 9. APPLICATION FOR PERMIT UNDER O.R. 735/73 City of Mississauga To undertake remedial works on the eroding banks of the Little Etobicoke Creek between Dixie & Burnhamthorpe Roads A staff communication was presented advising that an application has been received for a permit to undertake remedial works on the eroding banks of the Little Etobicoke Creek at the above location. Res. no Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the City of Mississauga be received: and THAT the application of the City of Mississauga for a permit to undertake remedial works on the eroding banks of the Little Etobicoke Creek along the stretch between Dixie Road and Burnhamthorpe Road, City of Mississauga (The' Regional Municipality of Peel), Etobicoke Creek watershed, be approved, subject to: (a) All rip-rap work being preceded by a filter mat or a 6"-l2" layer of crushed stone: (b) The rip-rap stone size being approximately lO"-l2" in diameter, that' is to say "one man stone": (c) Every effort being made to minimize the silting of the creek during construction; (d) Replanting being undertaken in areas disturbed by the construction; ( e) All areas disturbed due to construction being restored to the satisfaction of the Authority: CARRIED: lO. APPLICATION FOR PERMIT UNDER O.R. 735/73 The Regional Municipality of Durham To place a culvert to carry a watercourse under the proposed Bayly Street Extension, just east of West Shore Boulevard, Town of Pickering (Waterfront) A staff communication was presented advising that an application has been received for a permit to place a culvert to carry a watercourse, which drains into Frenchman Bay, under the proposed Bayly Street Extension at the above location. Res. #11 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of The Regional Municipality of Durham, be received: and THAT the application of The Regional Municipality of Durham for a permit to place a culvert to carry a watercourse under the proposed Bayly Street Extension in the area just east of West Shore Boulevard, Town of Pickering, (The Regional Municipality of Durham), be approved, subject to: (a) All gabion works being preceded by a filter mat or a 6"-l2" layer of crushed stone; (b) Every effort being made to minimize the silting of the watercourse durinq construction: -9- B-9 (c) Any fill proposed at the south-east corner of Bayly Street and West Shore Boulevard being properly compacted and not obstructing the flow in the watercourse, particularly during flood flows; (d) The Authority being approached for comments on the methodology used in placing and stabilizing any fill as stated in condition (c); (e) All areas disturbed due to construction being restored to the satis- faction of the Authority. CARRIED; ll. APPLICATION FOR PERMIT UNDER O.R. 735/73 Ministry of Transportation & Cornn\unications To channelize a tributary of the West Don River and a section of the West Don, just south of Highway #7, west of Dufferin Street, to alleviate flooding at Highway #7 resulting from undersized tributary; and to develop proper drainage capacities for proposed Highway #407 crossing of the Don River A staff communication was presented advising that an application has been received for a permit to undertake the channelization of a tributary of the West Don River and a section of the West Don at the above location. Res. #l2 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the Ministry of Transportation and Communications be received; and THAT the application of The Ministry of Transportation and Communications for a permit to undertake the channelization of a tributary of the West Don River and a section of the West Don River in the area just south of Highway #7, west of Dufferin Street, Town of Vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) This approval applying only to the channelization for the lO-year flood and not to the ultimate design as proposed; (b) Separate approval being requested at such time as the Highway #407 design is prepared; (c) Every effort being made to minimize the silting of the river during con:;truction; (d) All areas disturbed due to construction beinq restored to the satis- faction of the Authority and of the Town of Vaughan; (e) The detail design of the channel 'being approved by The Metropolitan Toronto and Region Conservation Authority; (f) All the necessary property easements and approvals being obtained by the Ministry of Transportation & Communications. CARRIED; 12. WATERFRONT PROJECT 1977-l98l - SCARBOROUGH SECTOR Property: Grace Ellis Res. #l3 Moved by: Dr. T.H. Leith Seconded by: Mr. M.J. Breen RESOLVED THAT: The Report (February l. 1979) set forth herein, receiv,ed from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. ' CARRIED ;. liRe: Project: WATERFRONT PROJECT 1977-l98l Scarborough Sector Authority: Executive Resolution No. 460, Meeting No. 23 - January 2l, 1976 and Authority Resolution No.46, Meeting No. 3 - April 9, 1976 . Subject Property: 33 Kingsbury Crescent Owner: Grace Ellis Area to be acquired: 0.582 acres, more or less Recommended Purhcase Price: $60,000.00, plus Vendor's legal costs B-lO -10- "Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being All of Lot 17 and Part of Lot 18, Registered Plan 2030, Borough of Scarborough, The Municipality of Metropolitan Toronto, having a frontage of approximately 56 feet on the south side of Kingsbury Crescent, west of Birchmount Road. "Situate on the property is a detached, two-bedroom, brick dwelling with an attached single-car garage. "Negotiations have been conducted with the owner and her solicitor, Mr. G.H. Lovatt, Q.C., of the legal firm Kingsmill, Jennings, Suite 8l0, III Richmond Street West, Toronto, M5H 2Jl and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price as follows: The purchase price is to be $60,000.00, plus Vendor's legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the ~"later Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An applciation has been made to the Ministry of Natural Resources for an Inspection Certificate." 13. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l: HUMBER VALLEY WATERSHED COMPONENT Property: R.K. Stanley Res. #!4 Moved by: C.F. Kline Seconded by: J.S. Scott RESOLVED THAT: The Report (January 3l, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED 1 "Re: ~rQject: Interim Water and Related Land Management Project 1979-l98l - Flood Plain and Valley Land Acquisition Authority: Component - Humber valley Natershed Executive Resolution No. 133, Meeting No. 4 - April 12, 1978 and Authority Resolution No. 51, Meeting No. 3 - April 2l, 1978 Subject Property: North side of Kirby Road Owner: R.K. Stanley ,. Area to be acquired: l7.94 acres, more or less Recommended Purchase Price: $2,500.00 per acre, i.e. $44,850.00, plus Vendor's legal costs "Included in the requirements for the above-noted project is an irregular':' shaped parcel of land, being Part of Lot 32, Concession VIII, Town of Vaughan, The Regional l1unicipality of York. being a partial taking from a'. larger property fronting on the north side of Kirhy Road, east of HighWay, #27, in the vicinity of Kleinburg. In addition to the parcel being acquired, the Authority is to receive a 20 foot right-of-way extending northerly from the Kirby Road to the parcel being purchased at this time.:, "Negotia tions have been conducted with the owner and her solicitor, Mr. " Walter G. Baker, Barrister and Solicitor, 5179 Yonge Street, Willowdale, Ontario, M2N 5P5 and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $2.500.00 per acre, i.e., $44,850.00, plus Vendor's legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. -11- B-11 "The Admini.strator of the \\later Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An applicai:ion has been made to the Minister of Natural Resources for an Inspection Certificate." 14. INTERIM WATER & RELATED LAND ~mNAGEMENT PROJECT 1979-l98l: Duffin Creek \\Iatershed Component Property: Fay Mavis Bayly Res. #15 Moved by: Dr. T . H. Le i th Seconded by: E.V. Kolb RESOLVED THAT: The Report (February l, 1979) set forth herein, received from the Property Administrator. be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; "Re: Project: Interim Water and Related Land Management Project 1979-l98l - Upper valley Conservation Land Acquisition Component - Duffin Creek Watershed Authority: Executive Resolution No. l33, Meeting No. 4 - April 12, 1978 and Authority Resolution No. 5l, Meeting No. 3 - April 2l, 1978 Subject Property: East side of Road Allowance between Concessions V and VI, Township of Uxbridge Owner: Fay Mavis Bayly Area to be Acquired: 51.99 acres, more or less Recommended Purchase Price: $l42,972.50, plus Vendor's costs "Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being Part of Lot 3, Concession VI, Township of Uxbridge, The Regional Municipality of Durham, having a frontage of approximately 660 feet on the east side of the Road Allowance between Concessions V and VI, north of the Pickering/Uxbridge town line, in the Glen Major area. \ subject to the "Negotiations have been conducted \'lith the owner and, approval of your Committee, agreement has been reached with respect to a purchase' price, as follows: The purchase price is to be the sum of $l42,972.50, plus Vendor's costs, with date of completing the transaction to be as soon as pos,sibl e. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing. for land transfer tax, legal costs and disbursements are to be paid. The Authoritv is to rece~ve a conveyance of the land required free from encumbrance. - "The Administrator of the \'later Resource Division has revie\'led this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 15. EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO -Proposed Remedial Work - Enfield Avenue/Sunset Avenue/Jellicoe Avenue Vicinity - Borough of Etobicoke (Etobicoke Creek Wa tershed) A staff communication was presented having regard to proposed toe protection work scheduled to be carried out at the above location. Res. #16 1010ved by: Mrs. J.A. Gardner Seconded by: H.G. Westney RESOLVED THAT: The staff communication on Erosion Control and Slope Stabilization in Metropolitan Toronto - proposed remedial work in the Enfield/Sunset/Jelli.coe Avenues vicinity, Borough of Etobicoke (Etobicoke Creek watershed) be received: and THAT the staff be directed to carry out toe protection work in the Enfield, Sunset and Jellicoe Avenues' vicinity at an estimated cost of $68,000.00; AND FURTHER THAT the Ministry of Natural Resources be requested to approve -" . '--- ~ - - -- --,- r ~ . . t "'. B-l2 -l2- lG. EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO -Final Geotechnical Engineering: Rear of No. 10 Codeco Court, Borough of North York (Don River Watershed) A staff" communication was presented having regard to major remedial work at #lO Codeco Court which is scheduled to commence this year. Res. #l7 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff be authorized to retain the firm Geocon (l975) Limited, Consulting Geotechnical Engineers, to carry out the final geo- technical engineering requirements for the proposed erosion control and slope stabilization work at No. lO Codeco Court. Borough of North York (Don River watershed), at a cost estimated to be $8,000.OO~ and THAT the Ministry of Natural Resources be requested to approve this work. CARRIED~ 17. SLOPE STABILIZATION WORK - DON VALLEY DRIVE -Change Order No.l A staff communication was presented having regard to slope stabilization work at the above lecation, and advising that the following extra items were found necessary because of the field conditions encountered and the difficult access to the work site: Change Order No. 1 Variation from Quantity Estimate $2,706.30 Additional Work - Gabion Walls 3,l90.00 End Slope Treatment 244.68 Tax Adjustment 57.6l $6,l98.59 Res. #l8, Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Change Order No. 1 to the contract for'slope stabilization work at Don Valley Drive. carried out by Tirnbergate Engineering Limited, in an amount of $6,l98.59, be approved~ and THAT the approval of the Province of Ontario be requested. CARRIED~ 18. PROPOSED MACHINE RENTALS - 1979 A staff communication was presented advising that seventeen quotations were requested and received for machinery rentals for 1979 for the Water Resource and Conservation Land Management Division works programmes. Res. #l9 Moved by: C.F. Kline Seconded by: E.V. Kolb RESOLVED THAT: The Water Resource Division and the Conservation Land Management Division retain the services of Sartor & Susin Limited and Mark O'Connor for the rental of construction machinery during 1979, theirs being the two lowest quotations received~ and THAT the approval of the Ministry of Natural Resources be requested. CARRIED~ 19. COASTAL ENGINEERING DESIGN AND CONSTRUCTION CONFERENCE -Attendance at A staff communication was presented advising that the Canadian Society of Civil Engineers is, sponsoring a Coastal Engineering Design and Construction Conference in Kingston, Ontario, on April 20, 1979. The program includes a number of topics related to shoreline management and erosion control. There will also be discussion on the design and construction of marinas and small craft harbours. -l3- B-13 Res. #20 Moved by: Mrs. L. Hancey Seconded by: E.V. Kolb RESOLVED THAT: lolrs. J.A. Gardner and Messrs. M.J. Breen. M.R. Garrett and D.E. Denney be authorized to attend the Coastal Engineering Conference in Kingston, Ontario, on April 20, 1979; and THAT their expenses in connection therewith, in an amount estimated to be $250.00. be paid. ' CARRIED; 20. APPLICATION FOR PERMIT UNDER O.R. 735/73 Con-Drain Company Limited To undertake construction of storm sewer outfall into the Don River south of Langstaff Road, west of Dufferin Street, Town of Vaughan A staff communication was presented advising that application has been received from Con-Drain Company Limited for a permit to construct a storm sewer outfall into the Don River at the above location. Res. #21 Moved by: C.F. Kline Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the application of Con-Drain Company Limited, be received; and TI~T the application of Con-Drain Company Limited for a permit to under- take the construction of a storm sewer outfall into the Don River, in the area south of Langstaff Road, west of Dufferin Street, Town of Vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) ~he headwall being aimed in a more downstream direction; (b) M. H. Number 4 being equipped with a water-tight cover; ( c) A gabion basket being placed upstream and downstream of the headwall structure to protect it from erosion; (d) The ~ank to the creek being properly stabilized and covered after construction; ( e) All areas disturbed due to construction being restored to the satisfaction of the Authority; (f) Every effort being made to prevent the silting of the creek during construction; (g) An easement being obtained to enter and do work on Authority-owned land. CARRIED; 2l. CENTRAL WATERFRONT MARINA PROJECT -Referral from City of Toronto Committee on Parks, Recreation and City Property A staff communication was presented advising that the Authority is in receipt of a communication from the City of Toronto Committee on Parks, Recreation and City Property wherein they considered a report prepared by the Central Waterfront Planning Committee of alternative marina sites in the Outer Harbour area. Res. #22 Moved by: Mrs. J.A. Gardner Seconded by: M.J. Breen RESOLVED THAT: The report on the Central Waterfront Marina project, as referred by the City of Toronto Committee on Parks, Recreation and City Property, be received and forwarded to the City of Toronto. CARRIED; B-14 -14- 22. MR. HIGGS advised that confirmation ha's been received from the Borough of Etobicoke of its invitation to the Authority to hold Authority Meeting 12/79 (Budget) a t the, .Etobicok e Civic Centre. 23. At the reques~ of MR~ SCOT~, the staff will arrange to hold an Executive Meeting at or a tour of the Guild Inn in the spring of this year. 24. ADJOURN~tENT : On Motion, the Meeting adjourned at 2:15 p.m., February l4. R.G. Henderson K.G. Higgs Chairman Secretary-Treasurer THE f1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 1 9 7 9 BUD GET EST I MAT E S FEBRUARY 141 1979 tn n :r: t';I c C t"' t':I al = I )0.... =U1 THE METROPOLITAN TORONTO a REGION CONSERVATION AUTHORITY 1979 BUDGET ESTIMATES .. " , . WATER a RELATED LAND MUNICIPAL LEVY MANAGEMENT $ 5,077,368 40.4 0/0 $4,696,157 37.3% WATERFRONT $2,800,000 22,2% PROVINCE OF ONTARIO $ 4, 696, 195 37.3 0/0 OPERATION a MAINTENANCE $ 3,223,,600 25.6% REVENUE $2,344,000 18.6% FOUNDATION a 'WINTARIO CONSERVATION a RECREATION $ 281,472 2.2% $466,000 3.7 0/0 SOURCES OF FUNDING ALLOCATION OF FUNDS THE r1ETROPOLITAN TQRONTO AND REGION CONSERVATION AUTHORITY 1979 BUDGET ESTIMATES I N D E X PAGE(S) PAGE(S) 1 - 3 Budget Report WATER & RELATED LAND MANAGEMENT 4 Budget Summary 5 Municipal Levies 25 - 32 Interim Project 6 Basis of Apportionment of Municipal Levies CONSERVATION & RECREATION LA~D K~NAGEMENT ADMINISTRATION 33 - 34 Conservation Areas - Support 7 - 8 Administration 35 - 36 Conservation Areas - Development 37 - 38 Conservation & Niagara Escarpmant Land OPERATIONS & MAINTENANCE 39 - 40 Information & Interpretive Program 41 - 42 Rent & Utilicies 9 - 10 General Operations 43 - 44 Taxes and Insurance 11 - 12 Conservation Area Operations 45 - 46 Waterfront Support 13 - 14 Information & Education Operations 15 - 16 Black Creek Pioneer Village SPECIAL PROJECTS WATER & RELATED LAND MANAGEMENT 47 - 48 Waterfront Plan 17 - 18 Operations & Maintenance of Water Control Structures HISTORIC SITES 19 - 20 Comrnuni~y Relations - Support 21 - 22 Community Relations - Development 49 - 50 Historic Sites Development 23 _. 24 Taxes & Insurance 1 9 7 9 1. CUR R E N T AND CAP I TAL BUD GET EST I MAT E S AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES The Metropolitan Toronto and Region Conservation Authority has adopted a program designed to further the conservation, restoration, development and management of the natural resources of the 1.339 square miles included in the Authority's area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the headwater areas of the Oak Ridges interlobate moraine, and the Niagara Escarpment as the major resources to which its programs are applied. Established resource management programs include flood control and water conservation, erosion control, waterfront devel- opment, and fish and wildlife management. In implementing these programs, 26,137 acres of land have been acquired and, in addition to their being managed for the conservation functions they perform, they are made available to the community for outdoor and conservation education. recreation and historic sites purposes. Within these comprehensive program guidelines, the Authority has. over the years, reflected the priorities and policies of the partners, the participating municipalities and the Province of Ontario as expressed through the representative Authortty members. Since 1957, 66% of the Authority's capital and development budget has been devoted to Water and Related Land ~!anagement, 19% has been devoted to Lake Ontario Shoreline Management, 13% to Conservation and Recreation Land Managemenc and 2% to Outdoor and Conservation Education. The 1979 Budget Estimates for administration. operations and maintenance, current and capital programs reflect the emphasis on Flood Control and Water Conservation. provide for the management of lands and facilities acquired and developed in connection with this program. and continue the approved Waterfront project at a reduced rate. FORMAT OF PRESENTATION These budget estimates are in accordance with the requirements of The Ministry of Natural Resources "Policy. Procedure and Information Manual for Conservation Authorities". There are five major types of Provincial grants available through the Ministry of Natural Resources to Conservation Authorities. l) Administration 4) Special Projects and Programs 2) Water & Related Land Management 5) Supplementary Grants (not applicable to M.T.R.C.A.) 3) Conservation & Recreation Land Management AUTHORITY PROGRAMS 2. The Authority Programs in these Preliminary Budget. Estimates are in seven basic categori~s:- 1) Administration 4) Conservation & Recreation Land Mana~ement Administration a) Conservation Areas - Support b) . Conservation Areas - Development 2) Operations & ~aintenance c) Conservation & Niagara Escarpment Land d) Conservation Area Information & Interpretive Program a) General Operations ~~ ,Rent & Utility Services b) Conservation Area Operations Taxes. Insurance etc... c) Information & Education Operations g) Waterfront - Support d) Black Creek Pioneer Village Operations 5) Special Projects 3) Water & Related Land Management Waterfront Plan a) Operation & Maintenance of Water Control Structures b) Community Relations - Support 6) Historic Sites c) Community Relations - Development d) Taxes; Insurance etc... Historic Sites Development e) Interim Water & Related Land Man. - Current & Capital Expenditures on administration. operations and maintenance and current .programs comprise the Authority's General Levy on all participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario. Expen- ditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in the specific projects. WATERFRONT PROJECT In 1977 the Authority commenced the second phase of the Waterfront Project. Originally this phase proposed expenditures of $4,400.000 per year over the five year period 1977-1981. Expenditures for 1977 and 1978 were $14,363,475 (including the acquisition of the Guild Inn). The Province has allotted $1.400.000 to this project in 1979. which will permit a total expenditure of $2.800.000. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT The year 1979 is the first year of the three year Interim Water and Related Land Management Project. This project will enable the Authority to establish and undertake a program designed to conserve. restore. develop and manage the natural resources of the Watersheds within the area of its jurisdiction, in accordance with the Water and Related Land Management Plan. 3. The Provincial Cash Flow, which has been authorized for Water and Related Land Management work in 1979. has required a reduction in the Interim Water and Related Land Management Project. The acquisition of flood plain and conservation lands has.been altered to accommodate the reduction. THE 1979 LEVY The apportionment of the 1979 Municipal Levies is based on the 1977 assessment data for 1978 taxation purposes. as supplied by the Province of Ontario. In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham. Peel and York will be levied an amount equal to 100% of the 1978 taxes paid by the Authority for revenue producing conservation areas within those munici- palities. Within Metropolitan Toronto. Authority lands are not subject to taxation. PROVINCIAL FUNDING The Provincial Grant structure used in these estimates is:- Administration 50% Water & Related Land Management 55% Conservation & Recreation Land Management 50% Waterfront Plan 50% The Province of Ontario has established the following level of funding for The Metropolitan Toronto and Region Conservation Authority for the 1979 fiscal year. Comparative figures for 1978 are also shown:- Increase 1978 1979 (Decrease) $ $ $ (1) Administration 603.000 638.500 35.500 (2) Water & Related Land Management 2.290.200 2,284,850 (5.350) (3) Conservation & Recreation Land Management 233.000 233.000 - 3.126,200 3.156,350 30.150 (4) Special Projects - Waterfront 1.400.000 1.400.000 - - Guild Inn 4.220,000 - (4.220.000) 8.746.200 4,556.350 (4.189.850) 1 9 7 9 BUDGET SUMMARY 4. 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS ( 1978 BUDGET I ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITuRES REVENiJES EXPENDITURES GRANT LEVY ADmNISTRATION I Administration 1.347,000 70.000 1.2.77,000 638.500 638.500 - 1.244.548 91.379 1.270.500 70.000 OPERATIONS & ~IA Il\'TENANCE General Operations 112,000 16.500 95.500 - 85.500 10.000 146.875 70,984 112.000 14,000 Cons. Area Operations 1.370.800 710.000 660.800 - 660,800 - 1.268.713 753.564 1.304.400 I 753.400 I Community Relations & Education 851,800 755,500 96,300 18.000 73,300 5,000 764.036 627.069 709.500 I 591.500 Black Creek Pioneer Village 889,000 750,000 139,000 72,000 67.000 - 877,810 773,296 854.000 i 710,000 3.223.600 2,232.000 991.600 90.000 886,600 15,000 3.057.434 2.224.913 2.979.900 2.068.900 I~ATER 1\ RELATED LAND ~IANAGE~1El\'T i I 184.000 I I I I Op~r. & ~bint. of W.C. Structures - 184.000 101.200 82,800 - 160,739 - 159.000 ! - I I Community Relations - Support 239,000 - 239.000 131.450 107.550 - 238,108 - 233,000 I - I Community Relations - Development " 476.194 - 476.194 41.800 34.200 400.194 266,649 - 288.000 I - I Taxes & Insurance 198.000 - 198.000 108.900 89,100 - 199,341 - 184.000 - . I 1.097.194 - l,097~194 I 383.350 313.650 400.194 864,837 - 864.000 - INTERIM WATER PROJECT 313,000 I I Current 453,000 15.000 438,000 240.900 197.100 318,330 I - - 15.000 I Capital - All Ben. ~~nicipa1ities 1.369,273 - 1; 369 ;273 753,100 616,173 - 2.772.757 - 2,602.770 Capital - Ben. Municipalities 1.776.690 27.000 1,749.690 957,345 792,345 - 1.007.021 22,469 972 .000 15~000 I 3.598,963 42.000 "3.556.963 1.951.345 1.605.618 - 4.098.108 22,469 3.887,770 30.000 CONS. & RECREATIO~ Lfu~D ~~NAGEMENT I Cons. Areas - Support 143.500 - 143.500 I 71.750 71,750 I - 126,235 - 126.500 - Cons. Areas - Development 126.500 - 126~500 I 63.250 63,250 - 217,264 - 213,500 - Icons. & Niagara Escarp. Land - - - - - 449,712 - 449,715 - Information & Interpretive 21.000 - 21,000 I 10,500 10.500 - 21,296 - 21.000 - IRent & Utilities 39.000 - 39,000 19.500 19,500 - 36.503 - 38.000 - I ITaxes & Insurance 70,000 - 70,000 35.000 35,000 - 68,178 - 67.000 - 400.000 - 400.0001 200.000 200.000 - 919.188 - 915.7151 - I- 1~i\TERFRONT I i I ~aterfront - Support 66.000 - 66,000 33.000 33.000 - 58,889 - 60,000 - Waterfront - Capital 2.800.000 - 2.800.000 I 1,400.000 1.400,000 - 11.486,993 - 11.439.578 - : T I I i HISTORIC SITES DEVELOPMENT I I I 'Ii' . S' I IstorlC ItcS 60.000 - 60.000 - - 60.000 I 51,557 - 84,000 - I I I i I I I I I I Total Current 6.646,794 2.317,000 4,~29.794 1.585.750 2.268,850 475,194 6.514,783 2,316.292 6,487.115 2,153.900 Total Capital 5.945.963 27.000 5.918.963. 3.110.445 2.808.518 - 15,266.771 22.469 15.014.348 15.000 l , 12.592.757 2,344,000 10.248,757 4.696,195 5,077.368 475,194 21.781.554 2.338.761 21.501,463 2.168.900 5. . THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY COMPUTATION OF 1979 LEVIES GENERAL PROJECTS - INTERIM WATER & RELATED LAND MANAGEMENT PROJECT - WATERFRONT 1979 Levy 1979 Total 1978 INTERIM WATER & RELATED PROJECT Before Tax Levy Incl. Total Incl. Capital Capital Waterfront Plan Tax Adjust. Adjust. Tax Adjust. Tax Adjust. Current All Ben. Ben. Mun. Total 1977-1981 $ $ $ $ $ $ $ $ $ Adja1a 190 - 190 183 19 58 - 77 52 Durham 31.629 42.536 74.165 71.112 3.080 9,629 11.250 23.959 21.909 Metro l.660.497 - l.660.497 1.667.324 170.411 532.739 522,345* 1.225,495 l.3l5.347 Mono 185 - 185 184 19 58 - 77 48 Peel 128.610 69,782 198.392 189.708 12.50~ 39.l07 45,000 96.616 29.564 York 112.091 26.230 138.321 132,l89 11.062 34.582 213.750 259.394 33.080 l.933.202 138.548 2.071.750 2.060.700 197,lOO 6l6,l73 792,345 1.605.618 1.400,000 * This figure includes $49.845. being Metro's share of costs of WC-58 Extension. BASIS OF APPORTIO~NENT - ~UNICIPAL LEVY BASED ON THE LATEST EQUALIZED ASSESSrlENT fIGURES AVAILABLE TO T~E AUTHORITY 6. (i9// ASSeSSMeNT UA1A rUK 1~/~ fAXATiUN PUKPUS~S) I Tot~tl % of I Equali2;ed Population Equalized Municipality Assessment Total In Municipalitv Assessment In Authority In Authority Population Authority l,OOO's of $'s l,OOO's of $'s Adjala Township 41,103 8 3,288 3,494 279 Durham, Regional Municipality of 699,621 * 546,880 64,603 51,197 ~etropolitan Toronto 28,710.379 100' 28,710.379 2,l47,852 2,147,852 Mono Township 63,984 5 3,199 3,856 192 Peel, Regional ~unicipality of 5,298,268 * 2.223,697 401.300 171,853 York.. Re~ional Municipality of 2.293.334 * 1,938,075 154,674 124,925 I 37,106,689 33,425,518 2,775,779 2,496,298 ANALYSIS OF REGIONAL MUNICIPALITIES Durh~~, Regional Municipality of 218.262 Ajax Town 86 187,705 22,318 19.193 Pickering Town 352,26l 95 334,647 31,541 29,963 Uxbridge Town 129,098 19 24,528 10,744 2.041 699,621 546,880 64,603 51,197 Peel, Regional Municipality of Brampton, City of 1,373.229 63 865,134 114,290 72,002 Mississauga, City of 3.637.307 33 1,200,311 263,652 87.005 Caledon Town 287,732 55. l58,252 23,358 12,846 5,298,268 2,223,697 401.300 l71,853 York, Regional Municipality of Aurora Town 15l,625 4 6,065 14,703 588 Markham Town 880,432 100 880,432 59,204 59,204 Richmond Hill Town 41?,203 99 408,080 35.150 34.798 Vaughan Town 481,122 . 100 481,122 l8.308 18,308 Whitchurch-Stouffville Town 160 . o~n 43 68.837 13.044 5,608 King Township 207.865 45 93.539 14,265 6.419 2.293,334 l.938.075 154,674 124,925 * NOT AVAILABLE IN TOTAL 1979 CURRENT BUDGET ESTIMATES PROGRAM Administration PAGE 7. PURPOSE: To provide the administrative and financial services of the Authority. 1979 OBJECTIVES: The continuation of general administration and financial support services for all Authority programs. Salaries of senior administrative staff and associated secretarial. Administrators - the Finance Division and Property and Administration Division. are charged to this program together with employee benefits for all employees. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: The budget estimates inc1ude:- _ an increase in salaries and wages of approximately 6% _ an increase in costs to cover the increased benefits of O.M.E.R.S. Pension Plan & O.H.I.P. OBJECTIVE CLASSIFICATIONS: Materials Salaries Employee Supplies & Real Services Financial & Wa~es Benefits Utilities Equipment Property & Rents ~ Expenses Total $ $ $ $ $ $ $ $ $ 560.150 440.500 158.750 - - 187.500 100 - 1.347.000 1979 CURRENT BUDGET ESTIMATES PRCG~AM ADmNISTRATlO~ P~GE 8. ------- I( --- I 1979 BUDGET SOURCES OF FINANCING 1978 I\CTUALS 1978 BUDGET I :'CTIVITY EXPENDiTUR~ REVENUES NET I! PROV!r\CIt.l I MUNICiPAL OTHER EXPENDiTURES REV Ef-:UES EXPa>.:DITUR~ REVE!\:'JES EXPENDITURES GRANT lEVY I isalaries 560.150 - 560,150 280,075 280.075 - 530.900 - 534.000 - rmPIOyee Benefits 440,500 - 440.500 220,250 220.250 - 399,301 - 424.000 - Travel Expenses 97.500 - 97.500 48.750 48.750 - 87.093 - 89,000 - iEquipment Purchase & Rental 36,000 - 36.000 18.000 18,aOO - 25.358 - 33,000 - fbtcrials & Supplies 81.500 - 81.500 40,750 40.750 - 72 . 843 - 75.000 - Rent & Utility Services 77 .250 - 77.250 38.625 38,625 - 78,344 - 68.000 - I General Expenses 54.100 70.000 (15,900) (7.950) (7,950) - 50.709 91.379 47.500 70.000 I I .\ I I I I ( TOTAL )( 1.347.000 I 7Q.000 I 1.277.000 )( 638.500 I 638.500 I - )( 1,244.548 I 91.379 )( 1.270,500 I 70.000 ) -. " 1979 CURRENT BUDGET ,""ESTIMATES PROGRAM Operations and Maintenance - General, Operations PAGE 9. PURPOSE: To provide administrative support services, not eligible for a Provincial Grant. 1979 OBJECTIVES: _ to fund the maintenance of revenue producing properties and other general maintenance _ to fund the public liability insurance on vehicles and equipment _ to fund renovations to the Head Office Administration Building _ to fund the office cleaning and maintenance _ to fund the Authority's share of vehicles and equipment FUNDING: Program revenues. the General Levy on all participating municipalities and Authority funds. No Provincial Grant is available for this program. ".' OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wa~es Utilities Equipment Property & Rents ~ Expenses Total $ $ $ $ $ $ $ $ - 32.500 5.000 - 74.500 - - 112.000 1979 CIJRB~NT BUDGET EST I i\ii ATES PRO:iRAM OPERATIO~S & ~IAINTENr\NCE - GENERAL OPER:\TIO~S FAGE 10, r 1 EX?ENOiTUR~ 1979 BUDGET If SOURCES OF FINANCING----" 1978 ACTUALS 1978 BUDGET ) I ~CTIVITY REVENU!::S NC""':" I PROViNCIAL I MU:-.JICIPAL OT:-iER I EXFE!I;DITURES REVENUES I EXP~DliU:;.::S I R~"'"~~IJES I EX?E~jDTTuRES GRANT , LEVY I Rental Property Mainten- I I I I i I lance - Revenue Producing i Pro pert ies I; General ~Iailltenance 32.500 16.500 16,000 - 16,000 - 32.388 21.194 24.500 14.000 IV'hiel' , 'quIp. Su''''''''' 5.000 - 5.000 - 5,000 - 19.358 - 5.000 - . Insurance 12,000 - 12 , 000 - 12,000 - 8.839 - 17,000 . - I . lie ad Office Renovations I 10,000 10,000 10.000 26.602 I - - - - 10.000 - I I Flood Control l1iorkshop 1.500 - 1,500 - 1.500 - 1.088 - 1,500 - I Office' Cleaning 19.000 - 19.000 - 19,000 - 15.317 - 17,000 - I Office Mliintenance 32.000 - 32,000 - 32,000 - 43.283 - 37,000 - i I I - - - - - - - 49.790 - - I I I I I I I ! I i , I I I J ( TOTAL )( 112.000 I 16.500 I 95,500 )( - I 85,500 I 10.000 )( 146.875 ! 70.984 )( 112.000 I 14,000 ) 1979 CURRENT BUDGET ESTIMATES. PROGRAM Operations & Maintenance - Conservat~on Area Operations PAGE 11. PURPOSE: The conservation and management of lands under the jurisdiction of the Authority and the provision of outdoor recreation opportunities. 1979 OBJECTIVES: _ the management and operation of 17.000 acres of Authority lands including 13 conservation areas. which will provide 1.5 million user days of recreation ., _ due to continued budget limitations. the 1979 estimates provide ,for the same level of maintenance of service as in previous years. This reflects adjustments in Authority priorities. Selective use and management of Authority lands is required to maximize use and minimize costs. - to provide self-supporting visitor services FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial grant is available for this program. FINANCIAL COMMENTS: In 1978. budgetted revenues were met because of excellent weather. conditions. continued interest in the Albion Hills winter program and the addition of the Bruce's Mill winter program. In 1979. projected program revenues have been estimated to be higher than 1978. reflecting some fee changes and increased program revenues. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies'& Real Services Financial & Wap;es Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ ,$ $ 822.125 224.785 121.690 - 17.750 184,450 - 1.370.800 1979 CUHREf\!T BUDGET ESTIMATES PROGR:"M OPERATIO:llS & ~I'\ I :-JTr::-J'\~CE - COXSERV"TIO:\ "REAS P:.G:: __ _12. r I 1979 BUDGET SOURCES OF FINANCING I( 1978 ACTU:\LS 1978 BUDGET , I ACTIViTY !l EXPENDITURSS REVENl.:::S N::T PROVINCIAL MUN!C!PAL I OTHER \ I EX?END!TURES REVE:-:UES I EXP8J:m.;,,~ REV=~~~::S I EX PEND ITURES GRANT LEVY I , ! I ; I I Albion Hills 233,000 140.400 92,600 - 92,600 - 226.187 148.631 I 229.000 141.000 I_ Boyd 137,000 82,600 54.400 - 54.400 - 120,833 89.969 I 125,000 87.500 I Bruce's ~Iill 161,000 114,100 46.900 - 46,900 - 133,983 104,380 139,000 I 102.000 I Claremont 50,000 11 , 000 39.000 - 39,000 - I 43,991 15.271 I 47,OlJO 13,000 Claireville 51.800 51,800 I I i 179.000 127.200 - - 198.807 132,307 198,500 I 132 ,000 Cold Creek 92.000 42,300 49,700 49.700 86.616 53.343 91,000 I 50,000 i - - I Glen lIaffy 84,500 26.700 57.800 57.800 68.690 25.151 I 71,000 25.000 I - - I ! I Greenwood 103,000 22.400 80,600 - 80,600 - 82,409 26,746 \ 88,000 i 26.500 I I I I i Heart Lake 129.500 67.700, 61.800 - 61,800 - 96,458 68.410 102.000 i 67,500 I \lIumber Trail s I I 9,000 1.500 7,500 - 7,500 - 6,957 1,760 I 5.500 1,700 I 7,800 7.800 33,520 I I mIne - - - - 17.300 33,000 17,300 I I Palgrave 9.000 9.000 - - - - 19,284 758 22,000 22,000 I I Serv ice Area 17.000 - 17,000 - 17,000 - 13,533 ,- 18.000 - I II~oodbridge 8.000 - 8.000 - 8,000 - 6,900 - 6,700 - i ! Petticoat Creek I 151,000 57.300 93.700 - 93.700 - 121.931 61.958 120.000 61.200 I I Visitors Services - - - - - - 8.614 ,7.580 8.700 I 6.700 I I I ! I .- j I I \ I I ( TOTAL )( 1.370.800 I 710.000 I 660.800 )( - I 660.800 I - )( 1,268.713 I 753,564 )( 1.304.400 I 753,400 ) 1979 CURRENT BUDGET ESTIMATES PROGRAM OPERATIONS & f1AINTENANCE - CO~~1UNITY_ RELATIONS - INFORMATION & EDUCATION OPERATIONS PAGE 13. PURPOSE: To provide an outdoor and conservation education programme for school students and other community groups at four Conservation Field Centres and a variety of outdoor and conservation education opportunities for the general public and school groups at the Kortright Centre for Conservation and at the Black Creek Pioneer Village. 1979 OBJECTIVES: _ a continuation of the programme at the same level of service as in 1978 for existing facilities _ the opening of the Kortright Centre Building for public use _ to provide an outdoor and conservation education programme for the following estimated number of students and adults: _ Black Creek Pioneer village 64.000 _ Conservation Field Centres l5,500 . Albion Hills Conservation Farm '9,000 - Maple Syrup Days 3l,000 _ Special Days, Field Trips, Claireville Dam Tours etc...... 12,000 _ Kortright Centre for Conservation 50.000 FUNDING: Programme revenues and the General Levy on all participating municipalities. A surplus or deficit on the operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited to the participating boards of education. A grant of $l8,000. from the Provincial Ministry of culture and Recreation is estimated for the operation of the Kortright Centre for Conservation. FINANCIAL COMMENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures. The net cost to the municipalities is estimated at $73.300. a decrease of $30,090 over 1978 budget. OBJECTIVE CLASSIFICATIONS: ,Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents ~ Expenses Total " $ $ $' $ $ $ $ $ 460.000 140.500 38.300 - 213.000 - - 85l.,800 1979 CURRENT BUDGET ESTIMATES PRCGRAM OPERATIO:l1S Ii ~L\I:\TENM:C:E - Cml~llJ:l11TY RELATIONS - INFOR~L\TION & EDUCATION OPERATIONS PAGE 14. - ! 1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS 1978 RUDGET ) I R::VENUES I I ACTIVITY EXFENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXFENDITU:.ES EXPENDITURES GRANT LEVY I I I I Albion Hills c.r.c. 147,500 147.500 - - - - 126.035 131.793 141.000 142.000 I !.Bord C.F.C. 167.000 167.000 - - - - 165,597 165.597 155,000 155,000 I Claremont C.F.C. 151.500 151.500 - - - - 146.151 146.099 141.000 142.000 Cold Creek C.F.C. 36,500 36.500 - - - - 38 .671 37.134 34.000 35,000 Lake St. George C.F.C. 68.500 68.500 - - - - - - - - , : I s Farm ) 18,201 8.414 30.100 27.000 I Albion Hills Operations ) INCLUDED I GENERAL INTI RPRETIVE PROG M 656 - 3,400 3.800 Bruce's ~Ii 11 ) 2,515 2.515 I 3.00~ 3.000 General Interpretive Prog. 10.500 10,500 - -, - - - - - - B.C.P.V. Pioneer Life 31.000 21,000 10.000 - 10.000 - 37.835 23.870 43,000 21.700 I B:C. P .,v. Tours 72 , 300 41,000 31,300 - 31.300 - 70.770 31.814 74.000 25,000 Kortright 167.000 112.000 55,000 18.000 32.000 5.000 93,711 25,826 85.000 37,000 !Farm Conversion - - - - - - 63,894 54.007 - - I - I j I I ( TarAL )( 851.800 I 755.500 I 96.300 )( 18.000 I 73.300 I 5.000 )( 764.036 I 627.069 )( 709.500 I 591,500 ) 1979 CURRENT. ,BUDGET ESTIMATES PROGRAM Operations & Maintenance - Black Creek Pioneer Village Operations PAGE 1~. PURPOSE: To provide a living portrayal of a crossroads village in. Pre-confederation Ontario. '1979 -OBJECTIVES: - to continue the effective operation of this heritage conservation, project within financial constraints . ' , _ to accommodate 300,000 visitors in 1979 ,'.' . . , _ to maintain the Village's heritage structures within financial constraints .. FUNDING: Program revenues, Provincial museum grant ($72,000). The Metropolitan Toronto and Region Conservat~on Foundation Endowment Fund ($10,000) and the General Levy on all participating municipalities ($72,000). FINANCIAL COMMENTS: This budget is 4.1% over the 1978 budget and will require considerable restraint in all expenditures. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services 'Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 591.000 249.700' 15.300 - 29.400 3.600 - 889.000 1979 CUR~Ef"T BUDGET EST!rJlATES PROGRAM OPERATIOXS & ~~I~TEN~~CE - BLACK CREEK PIONEER \ILLAGE OPE~\TIO~S p,,"'c Hi. I ",\)_ , 1f EXFEND:TURSS 1979 BUDGET SOURCES OF FINANCING ) 1978 ACTUALS I( 1978 BUDGET ) I ).CTIVITY NET PROVINCIAL MUNICiPAL I 1\ EXPE!'m!Tl;,,~ R::V::~~::S REVENUES EX PEND ITU"ES GRANT LEVY OTHER EXFENDITUR::S REVENUES I Registrar's Operations 23.750 - 23.750 - 23.75Q - 32,003 - 36.500 - Gatc House 14.250 - 14.250 - 14.250 - 12,080 - 13.000 - Admiil i strat ion 174,500 - 174.500 - 174.500 - 159,707 - 142.500 - I Building Staff etc... 285.750 - 285.750 72 . 000 213.750 - 272.353 - 267.000 - I Gift Shop Operations 174.750 - 174.750 - 174.750 - 177,988 - '175.000 - I Security 18.500 - 18.500 - 18.500 - 16.435 - 18.000 I - I -I j Livcstock Operations 51,500 - 51.500 - 51.500 - 54,094 - 49.000 I - I ! ~ainte~ance - Bui~dings 69.750 - 69.750 - 69.750 - 53,136 - 53.000 ~mintenance - Grounds 51.500 - 51.500 - 5'1.500 - 56.492 - 57.000 I - Workshop Opcrations - - - - - - 20,357 - 12.000 - Winter Program 6.250 - 6.250 - 6.250 - 5,299 - I 5.000 - I I Special Events 13 . 000 - 13.000 - 13.000 - 9.070 - 14.000 - , I~edding Program 5.500 - 5.500 - 5.500 - 6.558 - 4.500 - I Peacock 1100ds I - - - - - - 2.238 - 7.500 - I ' I Adr.lission Receipts I - 405.000 (405.000) - (405.000) - 434,322 i 400,000 I I i : Endowmcnt Fund Interest - 10.000 (10.000) - (10.000) - (170) I 6.000 I Food Services I - 40.000 (40.000) - (40.000) - 38.595 I 30.000 I Photography - 4,000 (4.000) - (4.000) - 3.678 4.000 Sales Outlets - 275.000 (275.000) - (275.000) 276.977 260.000 I - I Wcddings - 14.000 (14.000) - (14.000) - 10.815 7.000 I Rentals & mscellaneous - 2.000 (2.000) - (2.000) - 9.079 3.000 J \. ( TOTAL )( 889.000 I 750.000 I 139.00~ )( 72 . 000 I 67.000 I - )( 877.810 I 773.296 )f 854.000 I 710.000 ) .. 1979 CURRENT BUDGET ESTIMATES PR9GRAM Water & Related Land Management - Op~rations & Maintenance of Water Control Stru~tures (W5) PAGE 17. PURPOSE: To maintain Flood Control works established under the Authority's Plart for Flood Control and Water Conservation. 19]9.,DBJ~CTlVES: _ continuation of the regular maintenan,ce of Flood Control wO'rks .,:a"t.':a"'~level comparable with that of 1978 . ' ..,:,; "'~'.' ' _ major maintenance to be carried out at 11ilne, Black Creek'." Low~i" 'Hu~bei:'. Mass~y Creek and Claireville _ provision for the maintenance of erosion control channels constructed under the downstream erosion control program FUNDING: This is a shared program. 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: Funding has been allocated in order to cover a progressive mainten~ce program. including non- recurring major maintenance. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $. $ $ $ 67.30'0 55.800 - - 60.900 - - 184.000 1979 CURREN-r BUDGET ESTlr.nATES PROGRAM I~ATER & RELATED LA~D ~t~:'l:\GE~IENT ..:. OPERATIO~S & ~IAINTENANCE :..' I~^TF.R CONTROL STRUCTURES (I~5) P~G~ 18. f 1 EXFENDiTURES 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS If 1S78 BUDGET ACTIVITY NET PROVINCIAL MUNICIPAL II EX;:~D:TI.:!'\E:S R~VE~:~ES REVENUES EXPENDITURES , GRANT LEVY OTHER EXPENDITURES REVENUES Flood Warning System 18.000 - 18.000 , 9.900 8.100 - 12.488 - I 12.000 - Claireville Dam 23.000 - 23.UOO 12.650 10.350 - 26.871 - 23.000 - Milne Dam 4.000 - 4;000 2.200 1.800 - 5.054 - 6.000 - I G. Ross Lord Dam I 23.000 - 23,000 12.650' 10.350 - 19.868 - 23.000 - I Small Dams General 3.000 ' - 3.000 1.650 1.350 - 1.818 - , 4.000 - ! I Flood Control Channel' 75.0.00 - 75.000 41.250 33.7!!0 - 75.225 - 69.000 - Erosion Control 4.000 - 4.000 2.200 1.800 - 1.462 - 2.000 - ~~jor ~~intenance 34.000 - 34.000 18.700 15.300 - 17.953 - 20.000 I - ,I I I . , I I - I I I '" I J I I l .. ( TOTAL )( 184.000 I - I 184.000 )( 101.200 I 82.800 I - )[ 160.739 I - )( 159.000 I - ) 1979 CURRENT BUDGET ESTIMATES WATER & RELATED LAND MANAGEMENT - CO~~1UNITY RELATIONS (SUPPORT) (WiO) 19, PROGRAM PAGE PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information, community and staff relations and outdoor and conservation programme. 1979 OBJECTIVES: _ to provide information, publications, tours and official openings.of projects, photographic coverage, movie prints of existing films and exhibits relating to water and land man~gement aspects of the Authority programme FUNDING: This is a shared programme -- 55% of the funds being available from The Province of Ontario and the balance being funded from the General Levy and participating municipalities. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 210.235 28.765 - - - - - 239.000 1979 CURRENT BUDGET ESTIMATES PROGRAM ''lATER & RELATF.D LA.'lD ~I:\N'\GF.MF.NT - CO~U.RJNITY RELATIONS (SlIPPORT) (WIO) P""GE 20. r 1 EXPENOIT~RES 1979 BUDGET SOUrlCES OF FINANCING . l( 1978 ACTUALS 1978 hUXET I ACTIVITY NET PROVINCIAL MUN!CIPAL 'I EXPENDITURES EXPENDITWF.::S I REV!;N:JES REVENUES EX?ENDITURES GRANT LEVY OTHER REVE:-:UES I CO~SERVATION INFORMATION I Staff Salaries 57.735 - 57.735 31.755. 25.980 - 50.853 - '51.990 - Staff Travel & Expenses 2.000 ., 2.000 1.100 900 - 2.132 - 2.000 - - Publications & Printing 12.500 - 12.500 6.875 5.625 - 20.281 - 20.500 - Tours & Special Days 4.015 ' - 4.015 2.208 1.807 - 1.167 - 3.000 - Photographic Supplies 3.250 - 3.250 1.787 . 1.463 - 3.685 - 3.000 - i Motion Picture Program 4.000 - 4.000 2.200 1.800 - - - 4.000 - I . Exhibits 1.000 - 1.000 550 450 - 8.348 - 1.000 - 'I . Promotional Contingency. 1.000 - 1.000 ,550 450 - - - 1.000 - .1 I GONSERVATION EDUCATION I Staff Salaries 53.500 - 53.500 29.425 24.075 - 49.134 - I 50.225 .. Staff Travel & Expenses 1.000 - 1.000 550 450 - 1.066 - 1.000 - I 99.000 54 ;450 I Education Supervisors - 99.000 44.550 - 98.334 - I 92.235 - I I Part Time Staff - - - - - - 3.108 - 3,050 - I I I-=- I I I I I . . . ( TOTAL ]( 239.000 I - I 239.000 )( 131.450 I 107.550 I - )( 238.108 I - )( 233.000 I - ) , 1979 CURRENT BUDGET ESTIMATES PROGRAM Water and Related Land Management - Cocrnunity Relations (Development) (WlO) PAGE' ,21. PURPOSE: To develop the facilities required for the Authority's Outdoor and Conservation Education'Pr~grarns. . . 191~ OBJECTIVES: - the development of trails, outdoor ..exhibits and demonstr.atiQns ~t th.e' Boyd, conservati,Q~,'E'd~c:~.t"ton Complex '.' { - , . ." ,',;":-:'. . ........'.. ,', : - completion of the construction, initial furnishings. equipment and exhibits for the'Kortr'ight . .', Centre for Conservation - to carry out the construction and development of the Lake St. George Conservation Field Centre FUNDING: For the development of the Kortright Centre for Conservation. 55% of the funding is from the Province of Ontario, the balance from the General Levy. For the Exhibit Program. the $216.472 is dependant on funds from The Metropolitan Toronto and Region Conservation Foundation and from Wintario. $12,000 for the improvement of the Albion Hills Conservation Field Centre will be funded from special revenue. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 175.425 200.000 - - 100.769 - - 476.l94 1979 CURR.ENT BUDGET ESTIMATES PROGRAM WATER & RELATED LAND ~~~AGEMENT ~ C~~NITY RELATIONS (DEVELOPMENT) ,(WlOY. PAGE 22. 1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS I( 1978 BUIiGET ACTIVITY EXPE,"JOITURES REVENUES NET PROVINCIAL MUMCIPAL OTHER EXPENDITURES REV Er-:UES EXF~D1TURES REV~N:.lES EXPENDITURES GRANT LEVY I Boyd Education Complex - - - - - - 94.786 - 98.000 - , Kortright 292.472 - 292.472 41.800. 34.200 216.472 . 171.085 - 190.000 - Albion Hills C.F.C. 12.000 - 12.000 - - 12.000 - - - - Farm Interpretive Program - - - - - - - - - - Bard F.C. - - - - ..; - - - - - Workshop Craft Building - - - - - - - - - - I Claremont F.C. - - -' - - - - - - - : Cold Creek F.C. - - - - - - - - -, - I Glo..co 'ark - - - - - - - ' - - - . L~ke St. George 171.722 - 171.722 - - ,171.722 718 - - - I I I I r ( TOTAL )( 476.194 I - I 476.194 )( 41.800 I 3~.200 I 400.194 )( 266.649 I - )( 288.000 I - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Water & Related Land Mana~ement - Taxes. Insurance etc... (Wll ) PAGE 23. PURPOSE: To provide for costs associated with taxes on non-revenue producing areas an~ l~ability insurance on Authority lands under Water and Related Land Management Programs. _ . . FUNDING': This is a shared program. 55% of the funds being available ,fr~m,the.P.rovinc~ '~f':~tario and the ,balance being funded from the General Levy on all participat;inlr'~~,~"pali~ies"" . OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ .. - - - 9.000 189.000 - 198.000 1979 CURRENT BUDGET ESTIMATES PROGRAM I'IATER & RELATED LAND MA!-lAGE~IENT - TAXES AND INSll~ANCE (IH1) PAGE 24. 1979 BUDGET SOURCES OF FINANCING - ( 1978 ACTUALS , 1978 BUDGET ACTIVITY EXPE."IIDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER- EXPENDITURES REVENUES EXPENO!TUR::5 REV::~~~::S EXPENDITURES GRANT LEVY -Taxes, non-revenue 189.000 - 189.000 103.950 85,050, - 190.073 - 175.000 - Insurance ~.OOO - 9.000 4.950 4.050 - 9.268 - 9.000 - I ; ,\ . , , i , I ," -' ( TOTAL )( 198.000 I - I 198.000 )( 108.900 I 89;100 I - )( 199.341 I - )( 184.000 I - ) 1979 CURRENT .BUPGET :.ESTIMATES.. ., ,. - 25. . PROGRAM WATER Ii RELATED ",AND ~tA.~AGEMENT - INTERIM PROJECT SU~fllIARY' - CURRENT, Ii CAPITAL . , P"GE r 1979 BUDGET SOUfl"CeS Of FINANCING ' 1.978 ACTUALS 1978 2Ul:IGET - "1 j ACTIVITY , EXPE.'IlOITURES REVENUES NET PROVIN;i-AL ' MUN1C,leAL ' OTHER €XPE.~Dl'rURES 'REVENUES I EXP~~!TUR:S I ~~'{EN~ES f EXPENDITURE~ GRAN LE Y I . CURRENT ' . W.C. Projects 92,500 - - 92.500 50,875 41,.625 - .. 84",4J2 - 83.000 - - -~eg~ladons 182.500 - 182.500 100.375 !l2,125 - i56,599 - 154.000 - ConserVation Services 178,000 . 15.000 163~OOO 89.650 73,350 - 77,259 - 76.000 ' 15,000 .. CAPITAL ,. All Benefiting . - 1.369.273 - 1.369,273 753.100 616.173 - . - - 2,602.770 - .. Benefiting Municipalities 1..776,690 27,000 1.749.690 957.3~5 792.345 - 1.007.021 22.469 972.000 15,000 ' I I. .. - I , I . . I r ] I l ( TarAL )( 3.598,963 I 42,000 I 3,556,963 )( 1,951,345 11,605.618 1 - )( I 22.469 )( 3.887.770 I 30.000 ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Water & Related Land Management - Interim Project Current (W2) (W3) (W7) (W8) PAGE 26. PURPOSE: To provide the funding required for carrying out the objectives of the Interim Water and Related Land Management Project under current budget category and which apply to all municipalities benefiting as well as single benefiting municipalities. 1979. OBJECTIVES: _ to continue the program of the installat~on of a radio system in co-operation with the. Ministry of Natural Resources for transmitting flood control and flood warning information. _ the installation of three Telemark stream gauges in the continuing program of stream gauge telemetry _ the administration and enforcement of water management regulations. and sub-division reviews. including salaries of enforcement officers and sub-division review staff. travel. legal and technical support costs _ to carry out resource management practices on Authority lands and to provide Conservation Assistance Programs for private landowners FUNDING: This is a shared program. 55% of the funds being available from the Province of Ontario. and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: Salaries are based on 1978 levels. 'OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wa~es Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 250.900 65.800 23.000 - 113,300 - - 453.000 - . , 1979 CURRENT BUDGET ESTIMATES PROGRAM . WATER & RELATED LAND ~IANAGE~IE~'T - INTERnl PROJECT CURRENT - WATER COi\'TROL PROJECTS (112) P,.\i3E 27. 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 197"8 BUDGET ACTIVITY EXPENDITURES REVENUES NET. PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITUR::.5 R::VE!'-:~::S EXPENDITURES GRANT LEVY Staff Salaries 65.800 - 65.800 36.190 29.610 - 45.742 - 45.345 - Staff Travel 3.700 - ~.700 2.035 1.665 - 1.386 - 2.655 .,. Flood Control Structures - - - - - - 9.859 - 7,500 - Safety Stations - .. - - - - . - ISO - .- '. - Milne Study - - - - - - 1.500 - 4.500 - IFlood Warning System jRadiO 15,000 - 15.000 8.250 6.750 - 17.502 - 15,000 - !Te1emarks 8,000 - 8.000 4,400 3.600 - 7.365 - 6.,000 - Flood Control Centre - - - - - - 968 . - 2,000 . - I ! ( ToTAL )( 9~.500 I - I 92.500 )( 50.875 I 4~,625 I - )( 84.472 I - )( 83.000 I - ) 1979 CURRENT BUDGET ESTIMt'JES PROGRAM 11t\TER & RELATED Lt\~D ~IANAGE~IENT - INTERIM PRO.JECT CURRENT - 11ATER ~IANAGE~IENT REGULATIONS (117) P:'G:: 28, 1979 BUDGET SOURCES OF FINANCING ' 1978 ACTUALS 1978 BUDGET I ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXPENDITURES REVa.:U::S EXPENDITURES GRANT LEVY Staff Salaries 104.800 - 104.800 57.640 47.16B - 84.049 - I 77,845 - I Staff Travel. and Expenses 4.000 - 4.000 2.200 1.800 - 3.725 - 4.950 - Enforcement Officers Sal. 48.900 - 48.900 26.895 22.005 - 43.790 - 43.790 - I I Enforcement Officerl! Veh. 11.500 - 11.500 6.32.5 5,175 - 13.365 - 11.500 - . .legal Fees 8.300 - 8.300 4.565 3.735 - 4.912 - 10.415 - I I Technical Plans and ~~ps 5.000 - 5.000 2.750 2.250 - 6.758 - 5.500 - ,I I i I 1 I 1 I I ( TOTAL )( 182.500 I - I 182.500 )( 100.375 I 82.125 I - )( 156.599 I - )( 154.000 I - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM I~ATER & RELATED LA.f<lD ~L-\NAGHtE~T - INTERnt PROJECT CURRENT - CONS. SERVICES & RIVERBANK EROSION (I'i3) (I~8) P~G:: 29. 1979 BUDGET SOURCES OF FINANCING I 1978 ACTUALS 19i5 BUDGET 1 :'CTI'IITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXFENO!TURES I R::VE~~~ES EXPENDITURES GRANT LEVY Staff Salaries 31.400 - 31.400 17,270 14.130. - 14.850 - 14.850 - Staff Travel 2.000 - ~.OOO 1,100 900 - 1.078 - 1.750 - I Private Lands Reforestation 12.000 . 2.000 10,000 5.500 4.500 - 9.964 2,090 10.000 3,000 Stream Improvement 28.000 2,500 25.500 14.025 11.475 - 30,189 2.304 28.000 2.000 Reforestation Subsidies 1.000 - 1,000 550 450 - 303 - 1,000 - Farm Tree & Shrub 20,000 10.000 10.000 5.5PO 4,500 - 16.247 8.974 15,POO 9.000 Land Use Planning 6,000 500 5,500 3,025 2.475 - 4.62"8 215 5.400 1.000 Iprogram Study & Inf~rmation 7,600 - 7.600 4.180 3.420 - - - - - .Conservation Assistance - - - . - - - - - - - Conservation Lands fl'" PtOp..,,'nn 5,000 - 5.000 2.750 2.250 - - - - - Woodlot ~bnagement 45.000 - 45.000 24.750 20,250 - - - - - i ~iidlife Improvement 15.000 - 15.000 8.250 6,750 - - - - - 1 ILand Management Study I 5,000 - 5.000 2.750 2,250 - - - - - I I i o. I I ( TOTAL )( 178.000 I 15.000 I 163,000 )( 89.650 I 73.350 I - J[ 77.259 I 13,583 )( 76.000 I 15.000 ) 1979 CAPITAL BUDGET ESTIMATES PROGRAM Water and Related Land Management - Interim Project Capital pAGE 30. PURPOSE: To provide the funding required for carrying out the objectives of the Interim Water and Related Land Management Project under capital budget category and which apply to all municipalities bene- fiting as well as single benefiting municipalities. 1979 OBJECTIVES: - to continue the review of the Authority's Flood Control Plan from both hydrologic and environ- mental aspects - to continue vallyland acquisition as well as important headwater lands - to fi~ish engineering studies on the Wilket Creek and Oak Ridges - the continuation of Downstream Erosion Control in Metropolitan Toronto. Peel, York and Durham - the completion of the reconstruction of Highland Creek channels - first phase of construction of the Stouffville Flood Control Channel FUNDING: A 50% grant is available for pre-1978 projects and a 55% grant for post-1978.projects from the Province of Ontario and the balance being funded from the Capital Levy on participating municipalities. The approval of the completion of Project WC-58 on the Don River is being considered by the Province of Ontario; Metropolitan Toronto has approved its portion of the funding. The budget revision to include WC-58 will be made when the decision of the Province is known. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $, $ $ $ $ 510.000 468.00.0 - 842.273 1.325.690 - - 3.145.963 1979 CAPITAL BUDGET ESTI:\'~ATES PROGRAM I1ATER & RELATED LAND MANAGE~fENT - INTERnl PROJECT CAPITAL - ALL BENEFITING PAGE 31. r , 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS ( I 1978 BUDGET ACTIVITY NET PROVINCIAL MUN!CIPAL I I EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVENUES EX?END1TUR~ REVE:\~::S . . I Plan Review 397.000 "_. 397.000 218.350 178.650 - 29.585 - 60.000 - I ~nvironmental ~fonitoring 100.000 - 100.000 55.000 45.000 - 155.072 - 150.000 - I Flood Plain Acquisition 642.273 - 642.273 353,250 289,023 - 2.249~828 - 2.063,770 - Headwaters Acquisition 200,000 - 200,000 ,110.000 90.000 - - - - - I I Reforestation 10.000 - 10,000 5.500 4.500 - - - - - I .Stream Improvements 20.000 - 20.000 "11..000 ,9.000 - - - - - I Mapping - - - - - - 135.813 - 104.000 - I Erosion Inventory - - - - - - 12.599 - 10.000 - I I HYdrol~gic "Iodel ' . - ~ - -. ' - - 188.992 - 215.000 - I G. Ross Lord Dam - - - - - - , . - - - Public Relations - - - - - - 868 ' - - - . ( TOTAL )( 1.369.273 I - I 1.369.273)( 753.1001 616,1731 - )( 2,772,7571 - )( 2,602,770 1 - ) 1979 CAPITAL BUDGET ESTIMATES ?ROGRAM I~ATER & RELATED LA,,{D MA~AGEMEf\'T - INTERIM PROJECT CAPITAL - BENEFITING ~RJ~ICIPALITIES ?AGE 32. 1979 BUDGET SOURC:S OF FINANCING 1978 ACTUALS 1978 BUDGET ;'CTIVITY EXFE.I\:OITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPE.~OITURES REVENUES . EXPENO!TURES GRANT LEVY EX?E.~OITU~ RE:V~~~~;:S . Erosion Control ~Ietro 825.000 25.000 800.000 440.000 360.000 - 5S9.822 ' 22.469 505.000 15.000 Peel. 101.000 1.000 100.000 55.000 45.000 - :- - - - York 75.500 500 75.000 41.250 33.7S0 - - - - - I Durham 25.500 500 25.000 13.750 11.250 - - - - - I Highland Creek (M) 240.000 240.000 ' 132.000 108.000 408.759 400.000 I - - - - 'Stouffvi11e (Y) 395.000 - 395.000 217.250 177.750 - 10.234 - 20.000 - I~ilket Creek (M) 10.000 - 10.000 5,590 4,500 - - - 12,000 - Oak Ridges. (Y) 5.000 :- 5,000 2.750 2.250 - 11.600 - 10.000 - Sherway Drive - - - - - - . - - 10.000 - WC-58 - Don River 99.690 - 99.690 49,845 49.845 - 15,035 ' - 15.000 - Methane Gas Study - - - - - - 1,571 - - - I I I .. I i ( TOTAL )( 1,776.690 I 27.000 I 1.749,690)( 957,345 I 792.3451 - )( 1,007.0211 22.469)( 972.000 I 15.000) 1979 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Conservation Areas (Support) (Cl) PAGE 33. PURPOSE: To administer and develop Authority owned conservation lands in keeping with the conservation and recreation land management plan. To provide a comprehensive program of management and provision of outdoor recreation opportun- ities through facility improvements and master planning of conservation areas. 1979 OBJECTIVES: _ to complete the Conservation and Recreation Land Management component of the Watershed Plan _ to develop and schedule the Master Plan of Conservation Areas _ to administer existing programs and activities FUNDING: This is a shared program. 50% of the funds being available from,the Province of Ontario and" the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: The adjustment for 1979 identifies the realignment of existing staff salaries. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wa~es Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 133.760 - - - 9.740 - - 143.500 " 1979 CURRENT BUDGET ESTIMATES,' , ": < ':" - -. " . - PROG~A'''; 'CONSERVATION Ii' RECREATION LAND MAN^GE~IENT - CONSERVATION AREAS (SUPPORT) (Cl) . ., " . PAGE 34. r ... l - -.- ,.,. BUDGET SOURCES OF FINANCING "7. ACTIlALS ,.,UUl!GET . , . O\C.T.IVITY, -". '. " 'EXPEN~RES . REVENUES EXPEJt,i-fURES PR~~~~+AL MUN~~~~L ,OTHER EXPENDITUREs , REVENV.E~'"' ~~END~;URS' "R~VEN:.lES Staff Salaries" 11~7'160 '. ' 127.260 63.630 63.630.. 105.372 I. 104.500 . ~taff T,ravel Ii fxpe~ses. ' 3.240 . . - ~.240 1.620 1.620 ,. 2'.0~7' ..'. ' It. ': ',' 3,.000'1' ' - Vehicles' '. ',.6.~OO. '. 6.500 3.250 3.250. 6.239 , ' =1.000., - Pond Service " . .6~500. '. 6.500 3.250 3.250. 12.547 -,.. . 1"2,0'00 .':" I ' ' , . " . , . ' . , ,I ". ' . I I I . i . . [ TOTAL )( 143.500 I . I 143.500 )( 71.750 I 71.750 I . )( 126.235 I . )( 126.500 I . ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Conservation Areas (Development) (Cl) PAGE 35. -,- PURPOSE: To develop facilities on conservation lands in accordance with the intended five year develop- ment plan (1974-1978) and in keeping with the Ministry of Natural Resources direction not to impede the Uaster Pl,anning process. 1979 OBJECTIVES: To develop facilities to permit increased, attendance and enhance user experiences and reduce operational costs. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: Provincial and Municipal funding limitations for this program have necessitated the revision and extension of the five year Conservation Area Development Plan. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents, Taxes Expenses Total $ $ $ $ $ $ $ $ 23.l00 42.650 5.900 - 54.850 - - 126.500 : , " " . . 1979 CURRENT BUDGET ESTIMATES PROGRAM CO~SERVATION & RECREATION LAND MAN^GE~IENT - CONSERVATION AREAS (OEVELOP~IENT) (C1) P~"I" 36. -"'- 1979 BUDGET SOURCES OF FINANCING . 1978 ACTUALS If 19;B rsUO:iET ACTIVITY EXPEND:TURES REVEr-.:UES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REV Er-.:UES II EXPEl'~D!TU~::S I REVE~~'JES EXPENDITURES GRANT LEVY Albion Hills 43.600 - 43.600 21.800 21. 80Q' . - 17.37'1 - 14.375 - Black Creek 1.000 - 1.000 500 500 - 4.949 - 4.985 - Boyd - - - - - - 16.155 - 16.750 - Bruce I s ~Iill 12,500 - 12.500 6.250 6.250 - 15.864 - 13.545 - C1airevi11e - - - - - - 73.627 - ' 75,415 - Claremont - . - - - - - 6,201 - 6.020 - Cold Creek 29.000 - 29.000 14.500 14.500 - 18.641 - 18,710 - I Glen Haffy 8.500 - 8.500 4.250 4.250 - 18,914 - 19.520 - 'I Greenwood, 3.200 - 3,200 1.600 1.600 - 4,947 - 4.970 - I Heart Lake 7.000 - 7.000 3.500 3,500 - 16.648 - 16.705 - Oak Ridges - - :.. - - - 3.724 - 3.240 - Petticoat Creek 8.000 - 8.000 4.000 4,000 - 15,121 - 14.515 - Glen ~Iajor - - - - - - 2,541 - 2.160 - I Lake St. George I - - - - - - 2,555 - 2,590 - I I I Studies etc... 7.500 - 7.500 3.750 3.750 - - - - - General Development 6.200 - 6.200 3.100 3,100 - - - - - I Milne - - - - - - - - - - I ! I l I ( TOTAL )( 126.500 I - I 126,500 )( 63.250 I 63.250 I - )( 217.264 I - )( 213.500 I - ) - 1979 CAPITAL BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Cons. & Niagara Escarpment Land (C2) PAGE 37. - .PURPQSE: To acquire Conservation Area an4 Niagara Escarpment Lands ~~ set,ou~ 'in the Authority's plan for ancillary conservation measures and Niagara Escarpment La~d .acqui~ition~..:The purpose of ,. such acquisitions is to bring into public ownership envi~o~eh.ta~lY':important l~n~s such as , . source areas. headwater zone river valleys and Oak Ridge's; ~~rJ.o}i<I~,te'.'lI!oraine~lands. ., . . " . . Z;~:~"'~:"'.;''''::'~'''.'.~' .' ~'~';~:"~~~cT~-;'''.' -. ,,' . ~ '. . 1979 OBJECTIVES: There is no provision in the 1979 Budget Estimates to acquire any land under.this program. FUNDING: This is a shared program, a 50% grant on Niagara Escarpment Lands and Conservation Lands is available from the Province of Ontario. the balance being funded from the General Levy on all participating municipalities or funds which may be made available through The Metropolitan Toronto and Region Conservation Foundation or through funds raised through Authority revenues. FINANC IAL COMMENTS: Funding priorities preclude the allocation of grant aided funds to enable acquisitions under' this program in 1979. .- ." ., - : ., . . , ' . . .... . ' . .. ,- -. 1~19.. CURRENT.. BUDGET .ESTIMATES .- .- . 38~ :. .. . . . . . . . PROGRI.M CONSERVATION. 6 RECREA~ION LAND t.IA."AC9IENT -. 'CONSERVATION fi. NIAGARA .ESCARP~IENT LAND eC2) ~AGE. .. r 1:979: BUDGET 'SOURCES OF. FINANCING ~97S ACTUALS 1978 BUDGET ACTIVITY ,-EXPENOITURES REVENUES' NET, PRg~~tAL ~UNlC~!e~L OTHER EXPENDITURES REVENUES .1 EXPa!OliUi\S- RE:VEN~E:S : . EXPENDITURES lE .. '. Niagara Escarpment Land . - - - - - - 18.801 - . 18.800 . - , eonservat ion Area Land .. - - - - - - 430.911 - 430.915 - . . '. " .. - I i ' . I : I I , ' I I I I ( TOTAL )( - I - I - )( - I - I - )( 449,712 I - )( 449.715 I - ) .. 1979 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Conservation Area Information & Interpretive Program (C3) PAGE 39. PURPOSE: To provide information and interpretive programs related to recreation and land management in the Authority's 14 conservation areas. 1979 OBJECTIVES: To continue the programs carried out in 1978. FUNDING: This is a shared program. 50% of the funds being available from the Province o( Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: Limited funding from the Province of Ontario and member municipalities required some programs to be transferred to operations an~ maintenance for funding. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wa~es Utilities Equipment .Pr.operty & Rents Taxes Exp~nses Total ---- $ $ $ $ $ $ $ $ n.800 3.525 - - 5.675 - - 21.000 ,- ; ., . , , . . . ... ; ~ - . . ... ' .. " .,. . - " ~ , . ;. ... . , .. . - , 1979 CURRE~~T BUDGET ESTIMATES PROGRAM CONSERVATION Ii RECREATION L^,~D M^NAGE~IENT - CONSERVATION AREA INFOR~IATION Ii INTERPRETIVE (n) PAGE 40. - r 1 EXPENDITURES 1979 BUDGET SOURCES OF FINANCING 1978.:\CTUA~S 1978 BUDGET .\CTIVITY REVENUES NET' PROVINCIAL MUN!CIPAL OTHER EXPENDITURES REV E~UES EXPENClTURES R=:VE~~ES I EXPENDITURES GRANT LEVY Staff Sa1!lries 11.100 - 11.100 5.550 5 . 550" - '. 10.470 - 10.470 - Publications & Printing 3.000 - ~.OOO 1,500 1.500 - 3.200 - 3.530 - Tours & Special Days 2,000 - 2.000 1,000 1.000 - 1.511 - 2.000 - Photographic Supplies 2.900 - 2.900 1.450 1.450 - 3.822 - 3.000 - ~wtion Picture Program 2.000 - 2.000 1.000 1.000 - 2.293 - 2.000 - I ! I i I I I I I I I ! ( TOTAL )( 21,000 I - I 21.000 )( 10.500 I 10,500 I - )( 21,296 I - )( 21,000 I - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Rent & Utility Services (C5) PAGE 41. PURPOSE: Provision of administration of the Central Services and Stores. 1979 OBJECTIVES: _ the provision of stock supplies, including purchasing and distribution _ the provision of building and mechanical trades service to all Divisions of the Authority as required FUNDING: This is a shared program, 50% of the funds being available from~the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents ~ Expenses Total $ $ $ $ $ $ $ $ 35.930 - - - 3,070 - - 39.000 1979 CURRENT BUDGET ESTIMATES - .. ~ROGRAM CONSERVATION Ii RECREATIO:.l LAND ~IANAGEMENT - REfo.'T Ii UTILITY SERVICES (C5) p' ~~ ' il2.'. . ."'\J_ r 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS .." . . 19;8 BUDGET ' . I ACTIVITY NET PROVINCIAL MUN~C1PAL REVENuES '. EXPENCIT~R::S : REvt:-:UES EXPENDiTURES REVENUES EXPENDITURES GRANT EVY OTHER . EXPENDITURES , ' Staff Salaries. . '35.930 35,930 17.965 17.965. 34,052 ' . ' . - - - 34.000 , , .Vehicles 3.070 - ~.070 1.535 1,535 - 2..451 - . 4.000 ' . - ,. , . ' .. : '.. '. o. I . ( TOTAL )( 39,000 I - I 39,000 )( 19,500 I 19,500 I - )( 36.503 I - )( 38.000 I - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land Management - Taxes, Insurance etc... (C6) PAGE 43. PURPOSE: To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands and facilities under Conservation & Recreation Land Management programs. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy ~n all participating municipalities. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & WaJ!;es Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ - . - - - 10.000 60.000 - 70.000 -- 1979 CURRENT BUDGET ESTIMATES PROGRAM CONSERVATION Ii REr;REATION LAND MANAGEPIENT - TAXES AND INSURANCE (C6) P~GE 44. r ( 1979 BUDGET SOURCES OF FINANCING " 1978 ACTUALS 1978 BUDGET ,1 ACTIVITY I NET PROVINCIAL MUNICIP~L - I EXF~D!TU"::S I R::V::~:~::S EXPENDITURES REVENUES EXPENDITURES GRANT LEVY OTHER EXFENDITURES REVENUES . i I Taxes. non-revenue 60.000 - 60.000 30,000 30.006 - 58,797 - 58.000 - Insurance 10,000 - 10.000 5.000 5.000 - 9.381 - 9,000 - I I I I I I ( TOTAL )( 70.000 I - I 70,000 )( 35.000 '" 35.000 I - )( 68,178 I - )( 67.000 I - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM Water & Related Land Management - Waterfront Programs (W9) P:'GE 45. PURPOSE: To provide administrative. planning and engineering staff necessary for implementing the Waterfront Project. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy Qn all participating municipalities. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents ~ Expenses Total $ $ $ $ $ . $ $ $ 62.000 - - - 4.000 - - 66.000 1979 CURRENT BUDGET ESTIMATES, PROGRAM WATER & RELATED ~ND ~IANAGE~IENT - WATERFRONT PROGRMIS (1~9) PAGE lj6. 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 1978 BUDGET ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUN!C!PAL OTHER EXPENDITURES REVENUES EXPE.\:DlTURES REVE~UES EXPENDITURES GRANT LEVY Staff Salaries 62.000 - 62.000 31.000 31.000, - '. I 55.878 - 56.525 - 'Travel & Expenses 4.000 - 4.000 2.000 2.000 - 3.011 - 3.475 - I . . I I I ' I i I I I I ( TOTAL )( 66.000 I - I 66.000 )( 33.000 I 33.000 I - )( 58.889 I - )( 60.000 I - ) 1979 CAPITAL BUDGET ESTIMATES PROGRAM Special Projects - Waterfront Plan PAGE 47. PURPOSE: The purpose of the Waterfront Plan is to create, on the Lake Ontario Shoreline within the area of the Authority's jurisdiction, a handsome waterfront balanced in its land uses which will complement adjacent areas, taking cognizance of existing residential development and making available, wherever possible, features which warrant public use. 1979 OBJECTIVES: - the completion of the landfilling operation at Humber Bay West Phase II in preparation for surface development in 1980 - the continuation of the landfill project at Bluffer's Phase II and construction of launching and parking facilities - the continuation of development at Humber Bay East in preparation for completion in 1980 - the completion of preliminary 'design for future work along the Western Beaches - the continuation of the environmental monitoring program - the continuation of acquisition of endangered homes and construction of priority works relating to shoreline management - the continuation of the regular acquisition program - the completion of the Master Plan review for East Point Park FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the Waterfront Capital Levy on all participating municipalities. The Government of Canada ~as participated in the construction of shore protection at the Small Craft Harbour at Bluffer's Park. It is anticipated that the Federal Assistance will continue in 1979. FINANCIAL COMMENTS: 1979 is the third year of the second five year project for Waterfront Development and the estimates are based on anticipated cash flow from the Province of Ontario. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 50.000 - - 320.000 2.430.000 - - 2.800.000 1979 CAPITAL BUDGET ESTIMATES PROGRAM SPECIAL PROJECTS ,- I~ATERr:RONT PLAN PAGE 48, r 1979 BUDGET SOURCES OF FINANCING 1978 ACTUALS 1978 BUDGET ACTIVITY EXPENDrrUR~ REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEII:UES I EXFE.~DITI,;,,~ REVE:-:-..::;S EXPENDITURES GRANT LEVY . Humber Bay West 160.000 "- 160.000 80.000 80,000 - 398,632 - 305.578 - I H~mber Bay East 950.000 - 950,000 475.000 475.000 - 381.305 - 373.000 - I , Western Beaches 5.000 - 5.000 2.500 2.500 - 42)698 - 50.000 - Ashbridgc's Bay 5.000 - 5.000 2.500 2.500 - 67,683 - 70.000 - Bluffer's - I & II 740.000 - 740.000 370,000 370.000 - 374.230 - 352.000 - I East Point Park 20.000 - 20.000 '10. 000 10.000 - 46.255 - 69.000 - i Environmental Studies 60.000 - 60.000 ~O.OOO 30.000 - 96.880 - 100.000 - and ~Ionitoring Shoreline Management 450.000 - 450,000 225.000 225.000 - 167,637 - 175.000 - Staff Salaries 50.000 - 50,000 25,000 25,000 - ~6,304 - 80.000 - Land Acquisition 240.000 - 240.000 120,000 120.000 - 9.751,919 - 9,759,000 - ~l3pping - - - - - - 539 - 1.000 - Col. S. B. Smith 50.000 - 50,000 25,000 25.000 - 86.881 - 90.000 - Petticoat Creek 20.000 - 20.000 10 ,000 10.000 - ,16,030 - 15,000 - ~laintcnance 50.000 - 50.000 ~5,000 25,000 - - - - - - ! i I ( TarAL )( 2.800,000 I - I 2.800.000)( 1.400,000 1 1.400.0001 - )( 11.486.9931 - )( 11.439.5781 - ) 1979 CURRENT BUDGET ESTIMATES PROGRAM 'Historic Sites Development PAGE. 49. - PURPOSE: To carry out restoration and development work at the Black Creek Pioneer Village and other Authority historical sites in accordance with approved plans. 1979 OBJECTIVES: _ to carry out minor improvements to the buildings and landscaping at Black Creek Pioneer Village _ to complete the restoration of the Taylor Cooperage _ to continue the restoration of the Sawyer's Home _ to continue the restoration of the Richmond Hill Manse FUNDING: The Metropolitan Toronto and Region Conservation Foundation and Wintario. FINANCIAL COMMENTS: Work will proceed on these projects as funds become available from The Metropolitan Toronto and Region Conservation Foundation. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents ~ Expenses Total $ $ $ $ $ $ $ $ 10.000 10.000 - - 40.000 - - 60.000 1979 CURRENT BUDGET EST!MATES ?ROGRAM IlISTORIC SITES DEVELOP~IEt\'T P~E '50. r ... Hi79 BUDGET SOlJRCES OF FINANCING 1978 ACTUALS 1973 BUDGET , I ACTIVITY I' EXPE.'.lDITU.RES REVENUES . NE.T PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURSs.\ REVEX.JES '.' I EXPENDITURES GRANT LEVY IROblin'S Mill 1.000 - 1.000 - - 1.000 - - 1.000 - ' . .. I Boa 1"lh~a1 k 1.000 - ~.OOO - - 1.000 , 2.453 - 1.000 - '. IBrucc'S Mill .. - - 3.000 .' - ~. . . .~ . - - - - - - .... .-" '". . Carriage liorks - - - - - , - - - "...::;.:<::,F.. Doctor I 5 House - - - - - - 23.568 - 20.000 - . . ~Iennonite Meeting Hall - - - - - - 8 - - - I ITaYlor Cooperage 30.000 - 30.000 - - 30.000 185 - 30.000 - -1 Sawycr's Housc 12.000 - 12.000 - - 12.000 - - 12..000 - IRichrnond Hill ~~nse 10.000 - 10.000 - - 10.000 13.671 - 11.000 - la.copovo Visitors Centre - - - - - - 10.897 - - - ICollection 6.000 - 6.000 - - 6.000 775 - 6.000 - I I I I I J - ( TOTAL )( 60.000 I - I 60.000 )( - I - I 60.000 )( 51.557 I - )( 84 . 000 I - ) B-16 SCHEDULE "B" In accordance with Rule #6 - Rules for the Conduct of the Authority - Resolution #88/75, as amended, the following are biographies of persons recommended for appointment to functional advisory boards. HISTORICAL SITES Bradshaw, John. - member of Historical Sites Advisory Board since 1974 - garden commentator on C.F.R.B. for more than 29 years - garden editor for several newspapers - honoured for his horticultural knowledge and writings - active supporter of the Authority and Black Creek Pioneer Village - frequently publicizes activities of the Authority and Black Creek Pioneer Village on radio - Honorary Reeve of Black Creek Pioneer Village for the years 1976 and 1977. Russell, Dr. Loris - member of the Technical Advisory Committee and Historical Sites Advisory Board since 1964 - specialist in palaeontology - 40 years researching prehistoric life in western North America - retired from position of Chief Biologist, Royal Ontario Museum, in 1971 with title 'Curator Emeritus' and is Professor Emeritus of the University of Toronto - began collecting historical material for Canadian Centenary while serving as Director of the National Museum of Canada - research led to several noteworthy publications - detailed book on history of lighting in the 19th century and an account of 19th century crafts and industries. Scott, Dr. John - member of the Historical Sites Advisory Board since 1957 - Director of Electroencephalographic Department at Toronto General Hospital for almost 30 years - Professor of Physiology at University of Toronto - Chairman of Toronto Historical Board and Chairman of the Museum Committee for the Academy of Medicine - member of the Medical Historical Club of Toronto - member of the Ontario Historical Society - member of the York Pioneer and Historical Society - member of the Canadian Society for the History of Medicine - awarded the Medal of Service by the City of Toronto in 1975. McGinnis, Brig.-Gen. John - member of the Technical Advisory Committee and Historical Sites Advisory Board since 1963 - appointed Director for the newly restored Fort York by Toronto Civic Historical Committee in 1952 - presently Managing-Director with the Toronto Historical Board - actively involved with numerous military associations - the Architectural Conservancy of Ontario, Heritage Canada, Canadian Museum Association, the Company of Military Historians, the John Graves Simcoe Memorial Foundation, the American Association for State and Local -2- McGinnis, Brig.-Gen. John A. - continued History, the Institute of Public Administration of Canada, the Toronto-Amsterdam Twin City Committee, and the Convention and Tourist Bureau of Metropolitan Toronto. Davidson, William C., Q.C. - member of the Humber Valley Conservation Authority from 1950 to 1956 - involved \.,ith The Netropolitan Toronto and Region Conservation Authority since 1957 - Vice-Chairman and a member of The Metropolitan Toronto and Region Conservation Foundation from 1959 to 1966 - member of the Historical Sites Advisory Board since 1970. Neil, Mrs. Elsa - member of the Technical Advisory Committee and the Historical Sites Advisory Board since 1963 - prior to 1963, played a major role as consultant to the Humber Valley Conservation Authority in the design and construction of exhibits at the . Dalziel Museum - created the original concept of Black Creek Pioneer Village and worked on its inception. Langdon, John E. - member of the Historical Sites Advisory Board since 1973 - member of The Metropolitan Toronto and Region Conservation Foundation since 1976 - for several years, member of the Board of Trustees for the Royal Ontario Museum and also Vice-Chairman - Director of the Friends of Winterthur for six years - member of the American Antiquarian Society - corresponding member of the Colonial Society of Massachusetts and a Fellow of the Royal Society of Arts - was a member and Past President of the Ontario Heritage Foundation - member of the Silver Society of London, England - his knowledge and research in the field of silver has resulted in the publishing of four major books. McMeans, Mrs. Christine - appointed to the Historical Sites Advisory Board in 1977 - active member of the Junior League of Toronto since 1966 - Chairman of the Junior League's Arts and Education Committee and she prepared the presentation which resulted in a donation of up to $8,000 for the restoration of the Sawyer's Home at Black Creek pioneer Village Higgins, Harvey - presently First Vice-President of the Weston Lions Club - has served terms on both the Weston Board of Education and the York Board of Education - an employee of 23 years with Ontario Hydro - educational background includes a degree in Engineering Technology - outstanding record of dedicated public service on other committees of the Borough of York and as an active conservationist, would make an excellent contribution towards achieving the objectives of the Authority INFORMATION & EDUCATION Downing, John - political columnist for Toronto Sun - has worked for Toronto newspapers since 1958 - lives in Etobicoke with his wife and three sons - has taken a number of environmental science .-.nnrc:.Ac:. .=a+- nn;\T~"'C::;+-" nr 'f1nrnni-n - 3 - Downing, John - Continued - is a journalism graduate of Ryerson Poly tech- nical Institute - was an appointee to the Information and Education Advisory Board in 1977 and 1978 - 1I0nourary Reeve of Dlack Creek Pioneer Village for the years 1978 and 1979 Nelligan. B.E. - educated in Hamilton, Ontario, both elementary and secondary - attended College of Education, University of Toronto and obtained his D.A. in 1945 and his M.Ed. in 1960 - teaching experience: - - Director of Guidance for Hamilton Separate School System - Master of Peterborough Teachers' College - Inspector of Separate Schools in the Peterborough area - presently is the Director of Education for the Metropolitan Separate School Board - married with nine children and presently living in Toronto - member of the Albion Hills Conservation School Management Advisory Committee in 1967 and 1968 - member of the Conservation Education Advisory Committee from 1969 to 1972 - appointee of the Information and Education Advisory Board 1973 to 1978 - presented with Colonel Watson Award by the Ontario Association for Curriculum Development in 1978. Brown, C.G. - B.A. degree in honours geography from University of Toronto in 1951 - graduate from Ontario College of Education in 1952 - specialist's certificate in geQgraphy - Secondary School's Principal's Certificate - Teaching Experience: - 1952-54 teacher at Bathurst Heights Secondary School in North York - 1954-55 on a leave of absence and was teaching in South America - 1956-59 head of Geography Department, Downsview Secondary School in North York - 1959-61 Assistant to Superintendent of . Secondary Schools for North York Board of Education - 1961-63 Principal of Emery Collegiate Institute, North York - 1963-67 Principal of Earl Haig Secondary School, North York - 1967-69 Area Supervisor in North York - 1969-72 Superintendent of Program and Instruction - 1972-74, Assistant Director of Education, North York - 1974-Present - Director of the Metropolitan Toronto School Board - married with three children and presently living in Toronto ,- appointee to Information and Education Advisory Board from 1975 to 1978 Dunlop, W. John - appointee to Information and Education Advisory Board since 1971 - was Director of Public Service - Canadian Broadcasting Corporation - Education - Jarvis Collegiate Institute' - University of Toronto - married with two children - active service in R.C.N.V.R. - presently National Chairman of Public Relations Canadian Red Cross Society, Canadian Cancer Society, Salvation Army - 11 - Dunlop. \-1. John - Continued - lIlernlJer of fund-raising committees for disaster appeals, latest being the Indian Cyclone Relief 'Fund of which he was Chairman - mmnber of the Vadican Council II - on three occasions he has been the International Broadcasting Official for Her Majesty the Queen - life honourary member of the International Red Cross - Order of Distinguished Auxiliary Service for the Salvation Army - has gold cross from the Greek Red Cross - Chairman of several film festivals in Bulgaria, Puerto Rico and Monte Carlo " - former editor of I Saturday Night' " - has Queen Elizabeth's Silver Jubilee Medal , ~: .~,. - member of Badminton & Raquet Club of Toronto and ", . . the Canadian Club of New York .' - presently living in Mississauga. James, Robert L. - Professor of Sociology at Scarborough College, University of Toronto - formerly at University of Alberta, Montana State University, University of Nevada, obtained Ph.D. at University of Oregon - Research Consultant - Alberta Home and School Association - Research Association - Edmonton Council of Community Services - Educational Consultant - Ministry of Education (Family Life Studies) - teaching interests - family - current research, vocational versus marriage and family choices among senior public and secondary students on Ministry of Education grant - presently a resident of Scarborough, Canadian citizen - was hn appointee to the Information and Education Advisory Board in 1977 and 1978 WATERFRONT Pickett, P.B. , Q.C. - educated at the North Toronto Collegiate Institute University of Toronto, night school (B.A.) Graduate of Osgoode Hall Law School - home owner and life-long resident of Toronto, - former Executive Member of Bedford Park Home Owners Association - Paul and his wife Barbara have two children - Lawyer - called June, 1955 and in private practice at III Richmond Street West - Alderman, Toronto City Council; elected 1964, re-elected 1972 - member of Metropolitan Council 1964-l972 (inc1. ) - member of Executive Committee of Toronto and Metropolitan Toronto Council 1970-l972 (inclusive) - member of The Metropolitan Toronto and Region Conservation Authority 1971-l977 (inclusive) - Honourary Member and Council of Royal Canadian Legion Branch 344 (Queen's Own Rifles of Canada) - member of the Waterfront Advisory Board of The Metropolitan Toronto and Region Conservation Authority 1971-1978 (inclusive) - member of Board of Trade of Metropolitan Toronto - member 0: Board of North Toronto Memorial Arena - member of Metropolitan Licensing Commission, Vice-Chairman. Norton, G.F.R. - Canadian Citizen - married with three children - served with R.C.N.V.R. 1943-1945 (inclusive) - graduated University of Toronto, Civil Engineering 1952 - represented Canada in Sailing in Olympics of 1960, 1968, 1972 - 5 - Norton, G.F.R. - Continued - past Commodore of RCYC - past Vice-Chairman of Sail Ontario - Manager of Speci.al Projects, Department of Mollenhauer Limited - member of APEO and Engineering Institute of Canada - Director of Board of Toronto Brigantine Incorporated - Waterfront Advisory Board, appointee 1974-1978 (inclusive) CONSERVATION LAND MANAGEMENT Bell , R.E. - born at Gilford - Simcoe County - educated at Bradford High School and O.A.C. Guelph - graduated in Agronomy in 1949 - joined Ontario Ministry of Agriculture, Extension Branch in 1949 - 1949-l952 - Assistant - peterborough - 1952-l960 - Woodstock - Oxford as Agricultural Representative - 1960-l963 - Associate Director of Extension O.M.A.F. , Queen's Park - 1963-l970 - Ottawa as Area Co-Ordinator and Farm Management Specialist for l4 Eastern Counties - 1970 to present - Ag. Rep. in Peel at Brampton - member of Ontario Institute of Agrologists - served on Reforestation and Land Use Advisory Board 1970-l977 inclusive - served on Conservation Land Management Advisory Board in 1978 - has served on Conservation Farm Sub-Committee 1973-l978 inclusive Gardhouse, George - born - Toronto Gore Township and raised Chinguacousy Township - farmed at present location since 1950 - Past President - Peel County Soil and Crop Improvement Association - Past President - Peel County Junior Farmers - served 14 years as provincial Director, Ontario Soil and Crop Improvement A~sociation - Past President - Ontario Soil and Crop Improve- ment Association - nine years as a member of Chinguacousy Township Counc il - two years Deputy-Reeve", Chinguacousy Township - served on Peel Committee Services Board - associated fifteen years with The Metropolitan Toronto and Region Conservation Authority as Authority and Advisory Board member - assisted Authority by permitting Streambank Erosion Control Pilot Project to be undertaken on property. McDermott, Neil C. - graduated from University of New Brunswick with a Bachelor of Science degree in Forestry in 1954 - 1954-l965 - worked with Defence Construction Limited at Camp Gagetown, N.B. , Canadian National Railways and about one year with the Santa Fe Railway in Los Angeles - work in the above included such activities at timber salvaging, surveying and construction - since 1965, employed by the Department of Lands and Forests (now the Ministry of Nat~ral Resources) - last lO years as a Management Forester in the Maple District - since 1976, represented the Maple District on The Metropolitan and Region Conservation Authority Forestry Committee and also served on the Forestry Technical Review Committee for the Kortright Centre. - 6 - Bryson, Jesse A. _ resident and farmer in Town of Vaughan - served as Public School Trustee, four years as Councillor and four years as Deputy-Reeve in Township of vaughan _ past Chairman of York County Planning and Agricultural Committee and Board of Health _ president of Vaughan Township lIistorical Society in 1973 and 1974 _ received Honourary Membership in S.C.S.A. in 1962 and was President of Ontario Chapter _ involved with Junior Farmers Association and the Soil and Crop Improvement Association _ member of the Authority from 1957-l978 inclusive _ served on Humber Valley Advisory Board from 1957- 1978 inclusive _ served on Reforestation and Land Use Advisory Board from 1957 - 1971 _ member of Personnel Sub-Committee 1972 - 1975 _ Chairman of Personnel Sub-Committee 1976 - 1978 _ Chairman of Historical Sites Advisory Board from 1972 - 1978 _ Chairman of the Achievement Recognition Committee 1974 _ member of the Achievement Recognition Committee 1975 - 1978 Lemon, Eugene _ took over family farm in 1932 _ twenty years in dairy business then cash cropping _ reforested three acres in 1933 _ planted windbreaks a few years later - in the early 1950's, in co-operation with the Soils Department, University of Guelph, a land use plan, including soil and water conservation, was drawn up. The plan provided for strip cropping, a pond and 80,000 tile. This plan was carried out over several years _ pas~ President of Stouffville Co-Operative Association _ past President of York County Crop Improvement Association _ Past President of the Ontario Soil & Crop Improvement Association _ Past Chairman of the Ontario Safety Council _ Honourary member of the Soil Conservation Society of America _ representing Ontario Soil & Crop Improvement Association on Ontario Conservation Council for 10 years _ church secretary and secondary school class teacher for number of years _ served as an appointee on Reforestation and Land Use Advisory Board of The Metropolitan Toronto and Region Conservation Authority since 1957 _ since 1960, has been recording precipitation for The Metropolitan Toronto and Region Conservation Authority Flood warning Control Lister, Mrs. Lois _ appointee of the Conservation Areas Advisory Board since 1957 ~ - landscape architect ~( _ member of Canadian Society of Landscape Architects .( _ associate member of American society of Landscape I I Architects - M.A. Cambridge University, England (economics) _ post-graduate Fellowship at Radcliffe College, Cambridge, Massachusetts (Harvard - Radcliffe Management Training Course) - has lived in Toronto since 1949 - five children _ member, Board of Directors of the Linnaean Society of Canada _ delegate for the Canadian Society of Landscape Architects to the First European Conference on the Environment at V.N.E.S.C.O., Paris, December, 1977 - 7 - FLOOD CONTROL & \~ATER CONSERVATION Martin, L. , P.El1g. - married with two children - owner of CASE - Computer Applications and Systems Engineering - specializing in computer applications to earth sciences since 1961 - educated at the North Toronto Collegiate Institute - Senior Matriculation University of Toronto (B.A. Sc. Engineering Physics) and H.A. (GEophysics) - member of Association of Professional Engineers, Ontario - member of Canadian Institute of ~tining and Metallurgy - member of Society of Exploration Geophysicists (world-wide) - member of Soil Conservation Society of America - Chairman, Hetro Toronto Community Tennis Council - Executive, Etobicoke Sports Council - Executive and Chairman of Parks and Recreation Committee for Etobicoke Federation of Residents and Ratepayers Associations - member, Toronto Field Naturalists' Club - memb er , Flood Control and Water Conservation Advisory Board, 1977 and 1978 - member of Exploration Geochemists (world-wide) Swann, Wm. - born in Coleman, Alta. in 19l3 - educated in Marquis, Sask. - completed civil engineering course at Universi~y of Saskatoon in 1933 - 1946 appointed Civil Engineer with Township of Etobicoke - became Deputy Engineer and then Chief Engineer of ~orough of Etobicoke in early 1950's - past president of the Municipal Engineers' Association - past president and Director of the Canadian Institute of Pollution Control - member of the Association of Professional Engineers of Ontario, Federation of Environmental Organization, American Water Works Association, Roads and Transportation Association of Canada and served as a member of the Ontario Municipal Engineers' Advisory Committee to the Minister of Highways. 1979.02.l4. IKC. ~ B-17 , the metropolitan toronto and region conservation authority minutes REPORT #2/79 :~ECUTIVE COMMITTEE WEDNESDAY-MARCH-7-1979 #2/79 The Executive Committee met in the Board Room, Authority Office, 5 Shore ham Drive, Downsview, on Wednesday, March 7, 1979, commencing at 10:00 a.m. PRESENT FOR TilE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Ge1l Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott H.G. Westney Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Conservation Land Management Division P.B. Flood Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & Policy Mrs. A.C. Deans Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau Project Engineer-Development, Flood Control A.G. Sahabandu Section. Water Resource Division HEARING: Following the Roll Call, the Meeting recessed to hold a Hearing re: Kingspoint Developments Limited City of Brampton Etobicoke Creek Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hanc~y C.F. Kline E.V. folb Dr. T.H. Leith J.S. Scott H.G. Westney Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones 8-18 -2- PRESENT FOR THE MEETING (Contd.) Executive Secretary Mrs. K. Conron Research Planner, Planning & policy Mrs. A.C. Deans Senior Administrative Secretary Mrs. M. Mitchell Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau Supervisor, Property Administration, P&A Divn. D.J. Prince ABSENT WAS Member Mrs. S. Martin MINUTES The Minutes of Meeting #1/79 were presented. Res. 123 Moved by: M.W.H. Biggar Seconded by: H.G. Westney RESOLVED THAT: The Minutes of Meeting #l/79, as presented, be adopted as if read. CARRIED: SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 1. EXECUTIVE COMMITTEE MEETING MAY 30, 19 79 : GUILD INN Res. #24 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The meeting of the Executive Committee scheduled for Wednesday, May 30, 1979, be held at the Guild Inn, commencing at 10:00 a.m., followed by luncheon and a tour of the Guild Inn property. CARRIED, 2. DISPOSAL OF TOXIC WASTES A staff communication was presented having regard to the following resolution adopted by the Executive Committee at Meeting 120/78, held December 20, 1978: "Res. #53l Moved by: M.J. Breen Seconded by: Mrs. S. Martin RESOLVED THAT: The recommendation having regard to the disposal of toxic wastes in Ontario, as amended and contained herein, be approved: WHEREAS the disposal of toxic wastes in the Province of Ontario and in the Metropolitan Toronto region is a matter of critical importance: AND WHEREAS the indiscriminate discharge of these wastes to watercourses is dangerous and highly undesirable, THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region Conservation Autho~ity request the Government of the Province of Ontario and the Ministry of the Environment to immedi~tely . establish safe and controlled disposal sites for toxic wastes in the Province of Ontario. ,CARRIED: " -3- B-19 Further to the foregoing resolution, a letter under date of February 7, 1979, and report entitled "A Seven-Point Program for the Disposal of Liquid Industrial Waste", were received from The Honourable H.C. Parrott, D.D.S., Ontario Minister of the Environment, advising that "toxic wastes" hav~ the highest priority in the Ministry and that solutions are being actively sought to the very complex problem associated with their safe handling and disposal. Res. #25 Moved by: C.F. Kline Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication concerning the disposal of toxic wastes, together with the correspondence and report entitled "A Seven- Point Program for the Disposal of Liquid Industrial Waste", received from The Honourable H.C. Parrott, D.D.S., Ontario Minister of the Environment, be received. CARRIED; 3. BILLS 80 AND 195; ACTS TO AMEND THE MUNICIPAL ACT A staff communication was presented, advising that the Authority is in receipt of correspondence dated February 22, 1979, from the Essex Region Conservation Authority having regard to Bills 80 and 195; Acts to Amend the Municipal Act. Res. #26 Moved by: E.V. Kolb Seconded by: M.J. Breen RESOLVED THAT: The staff report, together with correspondence from the Essex Region Conservation Authority under date of February 22, 1979, be received; and THAT due to the confusion and apparent doubt created by amendments to The Municipal Act in the enactment of Bills 80 and 195, the Minister of Natural Resources and the Minister of Intergovernmental Affairs be urged to consider and clarify as soon as possible the intent concerning the pay- ment of per diem, mileage, salaries, expenses, benefits, etc. to members of a conservation authority appointed by its participating municipalities, so that budget estimates for 1980 may be adjusted accordingly. CARRIED; 4. QUOTATION #79-02 -One 1979 4-000rSedan, with Trade A staff communication was presented advising that the following quotations have been received (from the 27 invitations) for the supply and delivery of one new 1979 4-door Sedan with trade:. Hawman Plymouth Chrysler Ltd. $ 4,655.65 Eric Matson Motors $ 4,939.79 Pine-Mercury $ 5,014.10 Little Brothers $ 5,296.58 Wilson Niblett Chev. Olds $ 5,874.38 The above prices include all taxes and licence. Res. 127 Moved by: C.F. Kline Seconded by: M.J. Breen RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the supply and delivery of one 1979 4-door Sedan, with trade, in the sum of $4,655.65, including all taxes and licence, be accepted; it being the lowest quotation received. CARRIED; 5. QUOTATION #79-03 -One 1979 Station Wagon, with Trade A staff communication was presented advising that the following quotations have been received (from the 27 invitations) for the supply and delivery of one new 1979 Station Wagon, with trade: Hawman Plymouth Chrysler Limited $ 5,251.64 Eric Matson Motors $ 6,026.98 Pine Tree Mercury $ 6,105.50 Little Brothers $ 6,154.72 Wilson Niblett Motors $ 7,560.70 The above prices include all taxes and licence. B-20 -4- Res. .28 Moved by: C.F. Kline Secon.ded by: M.J. Breen RESOLVED THA'r: The quotation received from Eric Matson Motors Limited for the supply and delivery of one new 1979 Station Wagon, with trade, in the sum of $6,026.98., including all taxes and licence, be accepted; it being the lowest proper quotation received. CARRIED; 6. QUOTATION #79-04 -One 1979 I-ton Cab & Chassis, with Platform, with trade A staff communication was presented advising that the following quotations have been received (from the 27 invitations) for the supply and delivery of one new 1979 I-ton Cab and Chassis, complete with Platform, with trade: Hawman Plymouth Chrysler Limited $ 7,791.44 Little Brothers $ 8,620.85 O.M.S. Truck Centre $ 8,707.52 Eric Matson Motors Limited $ 8,829.55 pine Tree Mercury $ 9,222.19 McCombe ( In t. ) Trucks Limited $12,344.26 The above prices include all taxes and licence. Res. '29 Moved by: C.F. Kline Seconded by: M.J. Breen RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the supply and delivery of one 1979 I-ton Cab and Chassis, with platform, with trade, in the sum of $7,791.44, including all taxes and licence, be accepted; it being the lowest quotation received. CARRIED; 7. QUOTATION #79-05 -Four 1979 I-ton Cab & Chassis, with Platform, Trucks, with trades A staff communication was presented advising that the following quotations have been received (from the 27 invitations) for the supply and delivery of four new 1979 I-ton Cab & Chassis, with Platform, Trucks, with trades: Hawman plymouth Chrysler Limited $31,726.87 Eric Matson Motors Limited $32,089.47 Pine Tree Mercury $32,377.64 Little Brothers $32,600.20 O.M.S. Truck Centre $34,830.00 McCombe (Int. ) Trucks Limited $42,270.80 The above prices include all taxes and licences Res. #30 Moved by: C.F. Kline Seconded by: M.J. Breen RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the supply and delivery of four 1979 Cab and Chassis and Platform I-ton Trucks, with trades, in the sum of $31,726.87, including all taxes and licences, be accepted; it being the lowest quotation received. CARRIED; 8. QUOTATION 179-06 -One 1979 1/2-Ton Pick-Up Truck, with trade A staff communication was presented advising that the following quotations have been received (from the 27 invitations) for the supply and delivery of one 1979 1/2-ton Pick-Up Truck, with trade: Hawman Plymouth Chrysler Limited $ 4,040.18 Eric Matson Motors Limited $ 4,148.22 Little Brothers $ 4,214.59 Wilson Niblett Motors $ 4,825.78 O.M.S. Truck .Centre $ 5,123.02 pine Tree Mercury $ 5,189.36 McCombe (Int.) Truck s Limi ted $ 7,720.05 -5- B-2l The aforementioned prices include all taxes and licence. Res. '31 Moved by: C.F. Kline Seconded by: M.J. Breen RESOLVED THAT: The quotation of Hawman Plymouth Chrysler Limited for the supply and delivery of one 1979 1/2-ton Pick-Up Truck, with trade, in the sum of $4,040.18, including all taxes and licence, be accept~d; it being the lowest quotation received. CARRIED; 9. QUOTATION i79-07 -Rental of Vans and Trucks A staff communication was presented advising that the following quotations have been received for the rental of six 3/4-ton Pick-ups for use in the Authority Tree Planting Programmes and other Conservation Services' programmes: Carman's Car Rentals Limited 2 at $395.00/month for 6 months -&- 4 at $440.00/month for 1 month; 1,200 free miles; 9C a mile (6C per km) over mileage Tilden Rent-A-Car Company $370.00/month per unit; 1,200 free miles; llC a mile over mileage; Somerville Car & Truck 2 at $280.00/month for 6 mo~ths -&- Rental Limi ted 4 at $295.00/month for 1 month; 1,200 free mil~s; 6C a mile over mileage; Res. #32 Moved by: E.V. Kolb Seconded by: M.J. Breen RESOLVED THAT: The quotation of Somerville Car and Truck Rental Limited for the rental of two Pick-Up Trucks at $280.00/month for six months, and .' four PiCk-Up Trucks at $295.00/month for one month, plus l2C a mile over 1,200 mile/month, be accepted; it being the lowest quotation received. CARRIED; 10. KORTRIGHT CENTRE FOR CONSERVATION -Design of Entrance Area A staff communication was presented advising that the InfoJ;mation & ~Cation Division is developing a landscape plan for a 5-10 acre area, west of .' pine Valley Drive, and for the entrance road to the Kortright Centre for Conservation. In this connection, a proposal has been received from the consulting firm of Johnson Sustronk Weinstein & Associates Limited for preliminary design of the main entrance area to the Centre, in an amount estimated to be $1,800.00 to $2,400.00. Res. '33 Moved by: E.H. Card Seconded by: Dr. T.H. Leith RESOLVED THAT: The proposal received from Johnson Sustronk Weinstein & Associates Limited, dated February 16, 1979, for the design of the entrance area'to the Kortright Centre for Conservation, in the approximate amount of $1,800.00-$2,400.00, be received and approved; and THAT the above-named firm be authorized to proceed with the work in accord- ance with said proposal. CARRIED; 11. CONVENTION & TOURIST BUREAU OF METROPOLITAN TORONTO -Authority Participation in Co-operative Publication "Superguide to Metropolitan Toronto" A staff communication was presented advising that the Convention and Tourist Bureau of Metropolitan Toronto is producing a four-colour publication, entitled "Superguide to Metropolitan Toronto". This publication will feature major hotels, shopping facilities, natural attractions and major tourist attractions of Metropolitan Toronto. The new publication replaces the co-operative "Attractions" brochure, in B-22 -6- which the Authority has participated for the past four years. The cost of participating in "Superguide to Metropolitan Toronto" is $6,300.00 for a half-p~ge colour panel; this is for a press run of 300,000 copies and an over-run of 300,000 of the 'Attractions I section only. The Bureau has allowed the Authority a credit, for photographic services, in the amount of $1,100.00, leaving a balance cost to the Authority of $5,200.00. Res. #34 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The Authority participate in the production of 300,000 copies of the Convention & Tourist Bureau of Metropolitan Toronto promotional publication, "Superguide to Metropolitan Toronto", and in the over-run of 300,000 copies of the 'Attr~ctions I section, at a cost of $5,200..00. CARRIED; 12. DECISION OF HEARING Kings Point Developments Limi ted City of Brampton Humber River Watershed Res. #35 Moved by: Mrs. F. Gell Seconded by: E.H. Card BE IT RESOLVED THAT: This Executive confirm the decision of the Hearing held this 7tn day of March, 1979; and THAT the application of Kings Point Developments Limited, in accordance with Ontario Regulation 735/73, for permission to place fill and construct an institutional building (church) on Lot 7, Concession IE, City of Brampton (Etobicoke Creek watershed), be refused on the following basis: (a) This area is subject to flooding under a regional storm; (b) This property has been defined as flood plain and conservation land and, therefore, development will affect the conservation of land. CARRIED; 13. APPLICATION FOR PERMIT UNDER O.R. 735/73 Mr. Gino Flamino TO construct a single-family dwelling on Part Lot 10, Concession 6, Town of Caledon (Bolton) (Humber River Watershed) A staff communication was presented advising that an application has been received for a permit to construct a single-family dwelling on Glasgow Road, Town of Bolton, on the east bank of the Humber River. Res. #36 Moved by: M.J. Breen Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Mr. Gino Flamino, be received; and THAT the application of Mr. Gino Flamino for a permit to construct a single-family dwelling on Part of Lot 10, Concession 6, Town of Caledon (Bolton), Humber River watershed, be approved, subject to: (a) All work being completed to the satisfaction of the Authority and of the Town of Caledon. (b) The application complying with the existing by-laws and regulations of the Town of Caledon. (c) Every effort being made to minimize silting of the river during construction. CAR.~IED ; -7- B-23 '14. APPLICATION FOR PERMIT UNDER O.R. 735/73 Mr. Jean Francis To construct a 4' x 8' retention wall at 231 Rouge Hills Drive, Borough of Scarborough (Rouge River Watershed) A staff communication was presented advising that an application has been received from Mr. Jean Francis for permission to construct a 4' x 8' retention wall at the above-noted location. Res. #37 Moved by: Mrs. F. Gell Seconded by: J.S. Scott RESOLVED THAT: The application of Mr. Jean Francis, together with the staff communication, be received; and THAT the application of Mr. Jean Francis for permission to construct a 4 ' x 8' retention wall on Lot 84, Plan 284, 231 Rouge Hills Drive, Borough of Scarborough (Rouge River watershed), be approved, subject to: (a) A gabion apron being placed under the proposed row of baskets (shown in red on sketch); (b) A layer of crushed stone or a filter mat being placed prior to placing the gabion baskets; (c) The pzoposed fill being clean and properly compacted and covered; (d) Every effort being made to minimize the silting of the channel during construction. CARRIED; 15. APPLICATION FOR PERMIT UNDER O.R. 735/73 Ontario Ministry of the Environment To install a watermain along the valley of the Little Etobicoke Creek from Burnhamthorpe Road north to Eglinton Avenue, City of Mississauga A staff communication was presented advising that an application has been received for a permit to install a watermain along the valley of the Little Etobicoke Creek at the above location. Res. '38 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff communicat~on, together with the application of the Ontario Ministry of the Environment, be received; and THAT the application of the Ontario Ministry of the Environment for a permit to install a watermain extending along the valley of the Little Etobicoke Creek from Burnhamthorpe Road north to Eglinton Avenue in the City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed, be approved, subject to: (a) All chambers in the valley being equipped with watertight covers; (b) All gabion works being preceded by a filter mat or a 6" - 12" layer of crushed stone; (c) Every effort being made to minimize the silting of the creek during construction; (d) Every effort being made to minimize the destruction of the vegetation in the valley; (e) All areas disturbed due to construction being restored to the satisfaction of the Authority; (f) A replanting scheme being undertaken after construction is complete; (g) The creek being restored to its original configuration after the crossings are compl~ted. CARRIED; B-24 -8- 16. APPLICATION FOR PERMIT UNDER O.R. 735/73 Mr. John A. Dick TO install a culvert and place fill across a watercourse (tributary of the Humber River), TOwn of Caledon A staff communication was presented advising that an application has been received from Mr. John A. Dick to install a culvert and to place fill on Part of Lot 38, Concession II, Town of Caledon. Res. #39 Moved by: E.V. Kolb Seconded by: M.J. Breen RESOLVED THAT: The staff communication, together with the application of Mr. John A. Dick, be received; and THAT the application of Mr. John A. Dick for permission to install a culvert and to place fill across a watercourse (a tributary of the Humber River), on Part of Lot 38, Concession II, Town of Caledon (Humber River watershed), be approved, subject to: (a) The site plan being amended whereby the proposed driveway shall be relocated westerly in order to accommodate the toe of the newly-created side slope, which shall have a gradient of 3 horizontal to 1 vertical. The toe of the slope shall be at least 10 feet west of the easterly property line; (b) A rip-rap splash apron being installed at the easterly end of the culvert; (c) The size of the proposed culvert being less than 48 inches; (d) The silting of the watercourse being kept to a minimum during construction; (e) The newly-created side slopes being sodded and/or seeded; (f) The owner being deemed responsible for the maintenance of the culvert; (g) The culvert allowing for the free flow of water downstream (i.e., no obstructions to the flow of the water). CARRIED; 17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DUF~N CREEK WATERSHED -Property: M. Petramala Res. '40 Moved by: J.S. Scott Seconded by: Mrs., F. Gell RESOLVED THAT: The Report (February 21, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: Project: Interim Water and Related .Land Management Project 1979-1981 - Flood Plain and Valley Lan~ Acquisition .. Component - Duffin Creek Watershed ! Authority: Executive Resolution No. 133, Meeting No.4 - April 12, 1978 and Authority Resolution No.51, Meeting No.3 - April 21, 1978 : Subject I Property: North side of Main Street (Stouffville) I I OWner: M. Petramala Area to be Acquired: 0.033 acres, more or less Recommended Purchase Price: $1,000.00, plus Vendor's legal costs "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being Part of Lot 5, Registered Plan 70, Town of Whitchurch-Stouffville, The Regional Municipality of York, being a partial taking from a larger commercial property fronting on the north side of -9- B-25 Main Street in downtown Stouffville. "Negotiati.ons have been conducted with the owner and his solicitor, Mr. J.M. Armstrong, Q.C., of the legal firm Button, Armstrong & Ness, 6 Main Street East, Stouffville, LOH lLO and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price as follows: The purchase price is to be the sum of $1,000.00, plus Vendor's legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 18. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DON VALLEY WATERSHED -Property: City of North York Res. i4l Moved by: E.H. Card Seconded by: H.G. Westney RESOLVED THAT: The Report (February 19, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: Project: Interim Water and Related Land Management Project 1979-1981 - Flood Plain and valley Land Acquisition Component - Don Valley Watershed ~uthority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.5l - Meeting No.3 - April 21, 1978 Subject Property: South of Finch, East of Bayview Avenues OWner: City of North York Area to be Acquired: 2.411 acres, more or less Recommended Purchase Price: Nominal consideration of $2.00, plus legal and survey costs "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being Part of Lots 23, 24, 25, 26 and 27, Registered Plan 2134, City of North York, The Municipality of Metropolitan Toronto, having a frontage of approximately 253 feet on the east side of Bayview, south of Finch Avenues. II Negotiations have been conducted with officials of the City of North York and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the nominal consideration of $2.00, plus legal and survey costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate. B-26 -10- 19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PL^IN AND VALLEY LAND ACQUISITION COMPONENT: HUMBER VALLEY WATERSHED -Property: Finery Investments Limited Res. #42 Moved by: E.V. Kolb Seconded by: J.S. Scott RESOLVED THAT: The Report (February 20, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: Project: Interim Water and Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component - Humber Valley Watershed Authority: Executive Resolution No. 133, Meeting No. 4 - April 12, 1978 and Authority Resolution No.5l, Meeting No.3 - April 21, 1978 Subject Property: West side of Indian Line OWner: Finery Investments Limited Area to be Acquired: 10.800 acres, more or less Recommended Purchase Price: Nominal consideration of $2.00, plus Vendors' legal costs "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being All of Block "C", Registered Plan M-25l, City of Mississauga, The Regional Municipality of Peel, ~ocated on the west side of Indian Line, north of Darcel Avenue, immediately adjacent to the Indian Line Campground. II'Negotiations have been conducted with officials of Finery Investments Limited and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the nominal considerat~on of $2.00, plus Vendors' legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reasonable expenses incurred incidental to the clo~ing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. DAn application has been made to the Minister of Natural Resources for an Inspection Certificate." 20. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT: DUFFIN CREEK WATERSHED -Property: W.J. Smith Res. i43 Moved by: Mrs. J.A. Gardner Seconded by: Mrs. F. Gell RESOLVED THAT: The Report (February 28, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the acquisition. CARRIED; liRe: project: Interim Water and Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component- Duffin Creek Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978, and Authority Resolution No.5l, Meeting No.3 - April 21, 1978 Subject Property: 22 Market Street Owner: W.J. Smith -11- B-27 Area to be Acquired: 0.207 acres, more or less Recommended Settlement: $llO,OOO.OO, plus Vendor's legal costs, being payment in full for all claims "Included ill the requirements for the above-noted project is a rectangular- shaped parcel of land, being All of Lot 8, Registered Plan 972, Town of Whitchurch-Stouffville, The Regional Municipality of York, having a frontage'of approximately 60 feet on the east side of Market Street and a flankage of approximately 150 feet on the north side of Somerville Street in the downtown section of Stouffville. "Situate on the property is a one-storey, concrete building used for industrial purposes. "Negotiations have been conducted with the owner and his solicitor, Mr. G.C. Ness, of the legal firm Button, Armstrong & Ness, 6 Main Street East, Stouffville, LOH lLO and, subject to the approval of your Committee, agreement has been reached with respect to a settlement, as follows: The settlement of compensation is to be the sum of $110,000.00, plus Vendor's legal costs, being payment in full for all claims, with date of completing the transaction to be as soon as possible. "I recommend approval of this acquisition and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acq~isition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 21. FLOOD LINE PLOTTING ON THE HUMBER RIVER A staff communication was presented, advising that the backwater calculation and flood line plotting study presently being carried out by The Proctor Redfern Group on the Humber River has resulted in the identification of a problem upstream of Bolton on the Main Branch of the river, associated with the stability of the Canadian Pacific Railway embankment near Cedar Mills. Res. #44 Moved by: E.H. Card Seconde~ by: Mrs. J.A. Gardner RESOLVED THAT: The communication having regard to the Flood Line Plotting Study on the Humber River be received; and THAT the Proctor Redfern Group be authorized to carry out the hydraulic and stability analysis of the Canadian Pacific Railway embankment on the Main Branch of the Humber River at Cedar Mills at a cost estimated to be $12,900.00. CARRIED; 22. COLONEL SAMUEL BOIS SMITH WATERFRONT AREA -Navigable Waters Protection Act Application Mrs. F. Gell declared a conflict of interest and did not take part in dis- cussion or vote on the issue. A staff communication was presented, advising that the Authority is in receipt of communications from several individuals and organizations objecting to the recent application of The Metropolitan Toronto and Region Conservation Authority for approval of the filling proposed at the Colonel Samuel Bois Smith Waterfront Area, as it pertains to the Navigable Waters Protection Act. Res. #45 Moved by: M.J. Breen Seconded by: E.V. Kolb RESOLVED THAT: The letters of objection to the approval of the Colonel Samuel Bois Smith Waterfront Area under the Navigable Waters Protection Act be received; and THAT the objectors be advised that the Authority is committed to full review and approval of the Master Plan under the Environmental Assessment Act. CARRIED; B-28 -12- 23. WATERFRONT LANDFILL SITES -Charging for receipt of fill A staff report was'7presented, advising that at Meeting i17/78 of the Executive Committ~e, the staff was directed to prepare a detailed report on the feasibility',of charging a fee for receiving fill at Waterfront landfill sites. Res. #46 Moved by: E.H. Card Seconded by: H.G. Westney RESOLVED THAT: The report on proposed fee charging at Waterfront landfill sites be received; and THAT the charging system to be implemented at Aquatic Park by the Toronto Harbour Commissioners in April, 1979 be carefully monitored to determine the overall feasibility of charging for receipt of fill; AND FURTHER THAT in the interim, the Authority landfilling operations at Humber Bay and Bluffers Park Waterfront Areas continue on a "no charge" basis; AND FURTHER THAT at such time as the Authority undertakes landfilling at Colonel Samuel Bois Smith Park, or at any other new waterfront landfill, serious consideration be given to assessing a charge for each load of fill accepted. CARRIED; 24. WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: -Erosion Control & Slope Stabilization in The Regional Municipality of York: Proposed Remedial Work - 19th Avenue, Lot 30, Concession 8, Town of Markham (Rouge River Watershed) A staff communication was presented having regard to proposed remedial work at 19th Avenue in the Town of Markham, to prov.ide approximately 60 meters of rip-rap toe protection along the existing bank of the Little Rouge Creek. Res. #4'7 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Erosion control work be carried out in Lot 30, Concession 8, beside 19th Avenue in the Town of Markham (Rouge River watershed), at an estimated cost of $8,000.00; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 25. WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: -Erosion Control & Slope Stabilization in The Regional Municipality of York: proposed Remedial Work - 14th Avenue, Lots 5-6, Concession 8, Town of Markham (Rouge River Watershed) A staff communication was presented having regard to proposed remedial work in Lots 5-6, Concession 8, beside 14th Avenue in the Town of Markham. Res. #48 Moved by: E.V. Kolb Seconded by: Mrs. L. Hancey RESOLVED THAT: Erosion control work be carried out in Lots 5-6, Concession 8, beside 14th Avenue in the Town of Markham (Rouge River watershed), at an estimated cos~ of $9,400.00; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED, . -13- B-29 NEW BUSINESS 26. QUOTATION #79-14 -Paper Products A staff communication was presented advising that the following quotations have been received for the supply of paper products for all Conservation Areas for 1979: Toilet Tissue Towelling Rolled Interfold Single Fold Rolled Kimberly Clark $31. 45 $32.41 $14 .74 $20.55 Huntington Laboratories 38.07 40.29 17.83 24.87 G.H. Wood 33.10 27.36 13.96 19.47 Res. #49 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: The price received from G.H. Wood fo+ 100 cases of rolled toilet tissue at $33.10 per case; 30 cases of inter fold toilet tissue at $27.36 per case; 100 cases of single-fold towelling at $13.96 per case; and 50 cases of rolled towelling at $19.47 per case, totalling $6,500.30, be accepted; this being the lowest quotation received. CARRIED; 27. COMMONGREEN CONFERENCE, UNIVERSITY OF GUELPH: ,MARCH 16 -l8 , 1979 -Attendance at A staff communication was presented advising that the University of Guelph - students and faculty from the environmental fields - is offering a three- day course related to forestry, horticulture, landscape architecture and the landscape industry in Ontario. The programme is related to a variety of topics of value to the Conservation Land Management Division in the planning and development of conservation areas. The one-day registration is $20.00 and the three-day registration is $50.00. Res. #50 Moved by: Mrs. L. Hancey Seconded by: H.G. Westney RESOLVED THAT: David Dyce, Adele Freeman and Paul Flood be authorized to attend one day, and that Eric Oakleaf and Garry Misumi be authorized to attend three days of the Commongreen Conference at the University of Guelph on March 16-18, 1979; and ~IAT their expenses in connection therewith, in an estimated amount of $225.00, be paid. CARRIED; 28. CHAIRMEN'S COMMITTEE OF THE ONTARIO CONSERVATION AUTHORITIES -1982 Biennial Conference A staff communication was presented advising that The Chairmen's Committee of the Ontario Conservation Authorities has invited the authorities to submit requests having regard to the location of the 1982 Biennial Conference. Tne last Conference held in the Toronto area was in 1962. Res. #51 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority invite the Chairmen's Committee of the Ontario Conservation Authorities to hold the 1982 Biennial Conference in Toronto. ' CARRIED, 29. SUGARING OFF DAY - APRIL 7, 1979 . A staff communication was presented advising that for a number of years, the staff has been authorized to arrange for a 'Sugaring Off' Day in late March or early April. B-30 -14- Res. 52 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: The staff be authorized to make the necessary arrangements for 'Sugaring Off Day' to be held at Bruce's Mill Conservation Area on Saturday, April 7, 1979; and THAT Members of the Authority, Advisory Boards, Committees and Foundation, Chairmen of the Regional Municipalities, Mayors, Reeves, Regional Councillors, local M.P's and M.P.P.'s, Ministry of Natural Resources' personnel, Authority staff and families be invited; and THAT the charge for lunch be $2.50 for adults and $1.00 for children; AND FURTHER THAT the media representatives and their families be invited at no charge. CARRIED; 30. THE EFFECTIVE SECRETARY SEMINAR: SHERATON CENTRE HOTEL, APRIL 3, 1979 -Attendance at A staff communication was presented advising that a one-day seminar for secretaries will be held April 3, 1979 at the Sheraton Centre Hotel in TOronto. Res. '53 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: Mrs. Kay Conron, Executive Secretary, Miss Diane Warburton, Historical Sites Division and Mrs. Marjorie Pudney, Information and Education Division be authorized to attend 'The Effective Secretary' Seminar at the Sheraton Centre Hotel, Toronto on April 3, 1979; and THAT the course fee of $125.00 each be paid. CARRIED; 31. AUTHORITY-Qt'lNED VEHICLES -Purchase and Replacement Res. #54 Moved by: M.W.H. Biggar. Seconded by: E.H. Card RESOLVED THAT: The staff be directed to review the policy having regard to the purchase and replacement of Authority-owned vehicles and report to a meeting of the Executive Committee prior to the autumn of 1979. CARRIED ~ 32. EXECUTIVE COMMITTEE MEETING i3/79, MARCH 28, 1979: MRS. GELL invited the members to hold Executive Committee Meeting '3/79, March 28, 1979, at Humber College of Applied Arts and TeChnology (NOrth Campus). 33. ADJOURNloiENT On Motion, the Meeting adjourned at 12:05 p.m., March 7. R.G. Henderson K.G. Higgs Chairman Secretary-Treasurer ~ B-3l , the metropolitan toronto and region conservation authority minutes REPORT i3/79 ------ EXECUTIVE COMMITTEE WEDNESDAY-MARCH-28-1979 '3/79 ---~--- -------- The Executive Committee met in the Board Room, Humber College of Applied Arts ~nd Technology, Humber College Boulevard/Highway #27, on Wednesday, March 28, 1979, commencing at 10:00 a.m. In the absence of the Chairman, who joined the meeting late, Mrs. F. Ge 11 took the Chair. PRESENT FOR THE MEETING Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey E.V. Kolb Dr. T. H. Lei th J.S. Scott H.G. Westney Authority Member D. DiGiannantonio Authority Chairman R.G. Henderson Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Executive Secretary Mrs. K. Conron Research Planner, Planning & POlicy Mrs. A.C. Deans Head, Waterfront Section, WRD B.E. Denney Head, Conservation Education Section, I&ED Miss A. Hayhoe Development Co-ordinator, P&P J.W. Maletich Head, Flood Control Section, WRD J.C. Mather Senior Administrative Secretary Mrs. M. Mitchell Supervisor, Accounting.Services, FD Mrs. M. Mosseau ABSENT WERE Members C.F. Kline Mrs. S. Martin Mrs. Gell welcomed the Members and staff to Humber College. MINUTES The Minutes of Meeting #2/79 were presented. Res. 155 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Minutes of Meeting '2/79, as presented, be adopted as if read. CARRIED; B-32 -2- . . SECTION I - THE EXECUTIVE CO~1MITTEE SUBMITS TilE FOLLOWING ITEl~S FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: 1. CONSERVATION LAND MANAGEMENT DIVISION -1979 Budget Revisions A staff communication was presented having regard to adjustments to the . 1979 Budget for the Conservation Land Management Division. Res. #56 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: The 1979 Budget Revisions for the Conservation Land Management Division be received and appended as Schedule "A" of these Minutes; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions for the Conservation Land Management Division be included in the 1979 Budget Estimates of the Authority. CARRIED; 2. HISTORICAL SITES DIVISION -1979 Budget Revisions A staff communication was presented having regard to adjustments to the 1979 Budget for the Historical Sites Division. Res. #57 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The 1979 BUdget Revisions to the Operations and Mainten- ance Programme - Black Creek Pioneer Village for the Historical Sites Division be received and appended as Schedule "B" of these Minutes. CARRIED; Res. #58 Moved by: M.W.H. Biggar Seconded by: Mrs. L. Hancey RESOLVED THAT: The 1979 Budget Revisions to the Development Programme for the Historical Sites Division be received and appended as Schedule "c" of these Minutes; and THE EXECUTIVE CO~1MITTEE RECOMMENDS THAT: The 1979 Budget Revisions for the Historical Sites Division be included in the 1979 Budget Estimates of the Authority. CARRIED; 3. BLACK CREEK PIONEER VILLAGE -Portable Shelter Building A staff communication was presented having regard to the need for temporary accommodation for student tours at the Black Creek Pioneer Village. Res. #59 Moved by: Dr. T.H. Leith Seconded by: E.V. Kolb RESOLVED THAT: The communication regarding proposed temporary shelter accommodation for student tours at the Black Creek Pioneer Village be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Two portable classroom buildings be moved from the Kortright Centre for Conservation to the Black Creek Pioneer Village, to be used as temporary facilities, and that the cost of $10,000.00 be paid from funds transferred from the Special Revenue ACCOUnt. CARRIED; -3- , B-33 4. REPORT U/79 INFOR~~TION & EDUCATION ADVISORY BOARD Report '1/79 of the Information and Education Advisory Board was presented. Res. ItGO Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: Report il/79 of the Information and Education Advisory Board be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Recommendations Nos. 1 and 2, as set forth herein, be adopted: U The proposed amendments to Ontario Regulation 845/77, As Amended, as appended as Schedule "c" of the t-\inutes of Meeting 11/79 of the Information and Education Advisory Board, be included in the 1979 Amendments to Ontario Regulation 845/77; g The 1979 Budget Estimates of the Information and Education Division - Operations and Water & Related Land Management com- ponents, as amended and appended as Schedule "0" of these Minutes, be included in the 1979 Budget Estimates of the Authority. CARRIED; SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 5. THE B. HARPER BULL CONSERVATION FELLOWSHIP AWARDS COMMITTEE FOR 1979 -Appointment of Authority Representative A communication from the Chairman was presented having regard to the appointment of an Authority representative to The B. Harper Bull Conservation Fellowship Awards Committee for 1979. Res. fl6l Moved by: Mrs. J.A. Gardner Seconded by: E.H. Card RESOLVED THAT: Dr. T.H. Leith be appointed the Authority's representative for 1979 to The B. Harper Bull Conservation Fellowship Awards Committee. CARRIED; 6. UPPER THAMES RIVER CONSERVATION AUTHORITY -Visit to M.T.R.C.A. A staff communication was presented advising that a request has been received from Mr. J.R. Powell, General Manager of the Upper Thames River Conservation Authority for permission to visit this Authority on May 31, 1979, during the spring tour of the U.T.R.C.A. Res. fl62 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Upper Thames River Conservation Authority be advised that The Metropolitan Toronto and Region Conservation Authority will be pleased to have them visit projects of our Authority on May 31, 1979, and to welcome the touring party as guests at lunch. CARRIED; 7. QUOTATION #79-11 -Three 1979 MF-245 Diesel Tractors, with Trades A staff communication was presented advising that the following quotations have been received (from the 6 invitations) for the supply and delivery of B-34 -4- three new 1979 MF-245 diesel tractors, with trades: Sholdice Service & Supply $22,982.65 Rumble Tractor 25,466.00 Edwards Equipment Limited 26,536.00 Don Vallance Equipment Limited 26,744.65 A & W McKeown Limited 28,034.00 The above prices include all taxes. Res. #63 Moved by: E.H. Card Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The quotation of Sholdice Service & Supply Limited for the supply and delivery of three new 1979 MF-245 diesel tractors, with trades, in the sum of $22,982.65, including all taxes, be accepted; it being the lowest quotation received. CARRIED; 8. FINANCIAL REPORT & ACCOUNTS -January & February, 1979 Mr. Scott presented the Financial Report and Accounts for the months of January and February, 1979. Res. #64 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Financial Statement for the months of January and February, 1979, be received; and the Authority Accounts, in the amount of $1,387,133.53, being (a) Current Expenditures - Wages and Salaries $524,25l.l7; Materials and Supplies $272,825.60; (b) Capital Expend- itures - Wages and Salaries $37,454.27; Materials and Supplies $552,602.49, be appxoved for payment. CARRIED; 9. REPORT #1/79 INFORMATION & EDUCATION ADVISORY BOARD Report 11/79 of the Information and Education Advisory Board was presented. Res. fl65 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: Report 11/79 of the Information and Education Advisory Board be received; and THAT Recommendations #3 and fl4, as amended and set forth herein, be approved: '3 The Metropolitan Toronto and Region Conservation Authority purchase a quantity of reprints of the article "Conservation Education: The Role of Ontario's Conservation Authorities", by T.. Carr and A. Foster, printed in Volume 34, No.1 of the Journal of Soil and Water Conservation (January-February, 1979) , for distribution to Members and to members of Boards of Education in the area under the juris- diction of the Authority. !! The Chairman of the Information and Education Advisory Board and the Administrator of the Information and Education Division, with power to add, select a committee of three individuals not associated with the Authori ty, to undertake an evaluation of all academic programmes at the Albion Hills, Boyd, Claremont and Cold Creek Conservation Field Centres. CARRIED; 10. ADMINISTRATION OF ONTARIO REGULATION 735/73 -November/December, 1978; January/February, 1979 The staff presented a report concerning the administration of Ontario Regulation 735/73 for the period November/December, 1978; January/February, 1979. Res. 166 Moved by: Mrs. J.A. Gardner Seconded by: M.W.H. Biggar RESOLVED ~iAT: The report of the administration of Ontario Regulation 735/73 for the period November/December, 1978; January/February, 1979, be -5- B-35 received and appended as Schedule "E" of these Minutes. CARRIED; 11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Regional Municipality of Durham To cross the Duffin Creek with proposed watermain, just north of Bayly Street, Town of Aj ax A staff communication was presented advising that an application has been received for a permit to install a water main across the Duffin Creek at the above location. Res. #67 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of The Regional Municipality of Durham, ,be received; and THAT the application of The Regional Municipality of Durham for a permit to install a water main across the Duffin Creek in the area just north of Bayly Street in the Town of Ajax (The Regional Municipality of Durham), Duffin Creek watershed, be approved, subject to: (a) The original creek configuration and cross-sectional area being maintained; (b) The gabion baskets placed on the banks of the creek being keyed into the banks both upstream and downstream of the crossing; . , (c) Every effort being made to minimize the silting of the creek during construction. (d) The actual crossing being undertaken no later than the end of the month of September, 1979; (e) The waters in the creek being allowed to flow through the creek with minimum obstruction during the crossing; (f) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED; 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Bryan Thomas & Associates, Consulting Engineers, on behalf of D. Meharg and M. Vettese To regrade existing valley side slope on Part Lot 10, Concession 7, Town of Markham (Rouge River Watershed) A staff communication was presented advising that an application has been received for the proposed filling and grading at the above location. Res. #68 Moved by: Dr. T.H. Leith Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Bryan Thomas & Associates, Consulting Engineers, on behalf of D. Meharg and M. Vettese, be received; and THAT the application of Bryan Thomas & Associates, Consulting Engineers, on behalf of D. Meharg and M. Vettese, for permission to regrade an existing valley side slope on Part of Lot 10" Concession 7, Town of Markham (Rouge River watershed), be approved, subject to: (a) Prior to the issuance of a permit, the applicant submitting to the Authority a plan and profile of the proposed filling and grading for each and every lot (designated 128 as shown on the application); (b) No interference of any kind taking place on the property immediately east and abutting Lot 8, as shown on the plan; (c) Compaction of the lower portions of the subject lots being in accord- ance with the standard practices acceptable to the Soils Engineering Association~ (d) No pelllli.t being issued for lots l-8 incl. until such ti.me' as the site specific for 1-8 incl. have been graded to the satisfaction of the Authority and the Tar.1n of Markham; , (e) Every effort being made to minimize the silting of the R::>l>inson Creek during construction. CARRIED; B-36 -6- 13. APPLICATION FOR PE~IIT UNDER ONTARIO REGULATION 735/73 Frenchman's Bay Yacht Club Proposed shoreline protection and dock area dredging, Town of Pickering (Waterfront) A staff communication was presented advising that an application has been received for a permit to dredge material from the Frenchman's Bay Yacht Club docking area. Res. #69 Moved by: J.S. Scott Seconded by: H.G. Westney RESOLVED THAT: The staff communication, together with the application of Frenchman's Bay Yacht Club, be received; and THAT the application of Frenchman's Bay Yacht Club for permission to dredge material from their docking area and store it temporarily on adjacent Authority lands, be approved, subject to: (a) Dredged material removed from those locations shown on the attached plan being stored temporarily on Authority property as shown on this plan (approximately 70'x70' square) until full haulage load limits are permitted on municipal roads; (b) The storage site and grades being restored to the satisfaction of - the Authority; (c) The stora~e site being restricted from public access by erection of snow fencing, as shown on the plan; (d) The dyke being constructed on dredged course material east of storm outfall to permit only liquid drainage into Bay waters. CARRIED; 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of Transportation & Communications To place fill in the valley of the Black Creek between Queen's Drive and Lawrence Avenue West, City of North York (Humber River Watershed) A staff communication was presented advising that an application has been received for a permit to place fill at the above location. Res. #70 Moved by: E.V. Kolb Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the application of the Ministry of Transportation and Communications, be received; and THAT the application of the Ministry of Transportation and Communications for a permit to place fill in two locations in the valley of the Black Creek, in the area between Queen's Drive and Lawrence Avenue West, City of North York (Humber River watershed), be approved, subject to: (a) Every effort being made to prevent any silting of the creek during the placing of the fill; (b) The fill being placed in the same location as is shown on the plans submitted; (c) All areas disturbed due to construction being restored to the satis- faction of the Authority. CARRIED; 15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of Transportation & Communications To place fill in the valley of the Black Creek at Eglinton Ave. for the construction of the Northwest Metro Arterial A staff communication was presented advising that an application has been received for a permit to place fill at the above location. Res. i71 Moved by: E.H. Card Sec~nded by: H.G. Westney . . r -7- B-37 RESOLVED THA'l': The staff comn\unication, together with the application of the Ministry of Transportation and Communications, be received; and THAT the application of the Ministr~' of Transportation and Communications for a permit to place fill in the Black Creek valley in the area immediately north of Eglinton Avenue, be approved, subject to: (a) The fill being placed in such a manner as not to cause siltation of the creek; (b) The fill being seeded as soon as possible after placement; (c) All disturbed areas being restored to the satisfaction of the Authority; (d) The Ministry of Transportation and Communications reviewing the necessity of providing erosion control works on the Black Creek in the vicinity of the fill; (e) The detail design being approved by the Authority; (f) The development of the baseball diamond having the Authority's approval prior to the construction of any facilities; (g) The Borough of York ensuring the maintenance of the snow dump area in order to keep it free from debris, etc. CARRIED; 16. INTERIM WATER E RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT - PETTICOAT CREEK WATERSHED -Property: Bramalea Limited Res. #72 Moved by: J.S. Scott Seconded by: Dr. T.H. Leith RESOLVED THAT: The Report (r-1arch 8, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; "Re: Project: Interim Water and Related Land Management Project 1979-l98l - Flood Plain and valley Land Acquisition Component - Petticoat Creek Watershed Authority: Executive Resolution No. 133, Meeting No. 4 - April l2, 1978 and Authority Resolution No. 51, Meeting No. 3 - April 21, 1978 Subject Property: East side of Rosebank Road Owner: Bramalea Limited Area to be Acquired: 23.171 acres, more or less Recommended Purchase Price: $2,500.00 per acre, i.e., $57,921.50, plus Vendors' legal and survey costs and construction of a post and wire fence. "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being Part of Lots 29 and 30, Range III, BFC, Town of Pickering, The Regional Municipality of Durham, located on the east side of Rosebank Road, south of Highway #401. "Negotiations have .been conducted with officials of Bramalea Limited and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The p~rchase price is to be the sum of $2,500.00 per acre, i.e., $57,9 7.50, plus Vendors' legal and survey costs and construction of a post and wire fence along the new property boundary, with date of completing the transaction to be as soon as possible. "I recommend approvat of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All rea.sonable expenses incurred.incidental to t~e closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. B-38 -8- "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation.' "Funds are available. "An application has been made to the M,inister of Natural Resources' for an Inspection Certificate." 17. WATERFRONT PROJECT 1977-1981: ETOBICOKE SECTOR, HUMBER BAY AREA -Property: Her Majesty the Queen in Right of Ontario Res. #73 Moved by: Dr. T.H. Leith Seconded by: E.n. Card RESOLVED THAT: The Report (March 14, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretar- Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: project: Waterfront project 1977-1981, Etobicoke Sector, Humber Bay Area Authority: Executive Resolution No.460 - Meeting No.23 - January 2l, 1976 and Authority Resolution No.46, Meeting No.3 - April 9, 1976 Subject Property: South side of Lakeshore Blvd. Owner: Her Majesty the Queen in Right of Ontario Area to be Acquired: 0.120 acres, more or less Recommended Purchase Price: $100.00 "Included in the requirements for the above-noted project are two irregular-shaped parcels of land, being Parts of Lots 6 and 7, Registered Plan 83, Borough of Etobicoke, The Municipality of Metropolitan Toronto, located on the south side of Lakeshore Blvd., west of Park Lawn Road. "Negotiations have been conducted with officials of the Ministry of Natural Resources and, subject to the approval of your Committee, agree- ment has been reached with respect to a purchase price, as follows: The purchase price is to be $100.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this pro- posed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." IS. THE MUNICIPALITY OF METROPOLITAN TORONTO -Request for Authority-owned Land Res. '74 Moved by: J!:.V. Kolb Seconded by: M.J.' Breen RESOLVED THAT: Three small parcels of land, containing a total area of 0.06 acres, more or less, being Part of Lot 27, Concession "B", F.T.H. , in the Borough of Etobicoke (The Municipality of Metropolitan Toronto), which were inadvertently. expropriated by the Authority, be conveyed to The Municipality of Metropolitan Toronto, for the widening of Albion Road, for the nominal consideration of $2.00; and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended; AND FURTHER THAT The appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; -9- B-39 19. CITY OF NORTH YORK -Request for Permanent Easements A staff communication was presented, advising that a request has been received from the City of North York to provide permanent easements for sanitary and storm sewers, required for residential development, south of Steeles Avenue, between Bathurst Street and Dufferin Street. The proposed easements affect Authority-owned land known as Parts of Lots 23 and 24, Concession II, W.Y.S., All of Block "0", Plan M-1859 and Part of Virginia Street, Registered Plan 2570, City of North York (The Municipality of Metropolitan Toronto. Res. #7,5 Moved by: E.H. Card Seconded by: E.V. Kolb RESOLVED THAT: Permanent easements be granted to the City of North York, required for sanitary and storm sewers for residential development, south of Steeles Avenue, between Bathurst ~nd Dufferin Streets. Said easements are shown as Part 1 on Plan reference No. 78-21-709-30, Parts l, 2 and 3 on Plan reference No. 76-60-21-709-3-1, Part 1 on Plan reference No. 76-60-21-709-3-2, Part 1 on Plan reference No. 76-60-21-709-3-3, Block "Oil on Plan reference No. M-l859, all prepared by J.D. Barnes Limited, Surveyors. The Authority-owned land affected is Parts of Lots 23 and 24, Concession II, W.Y.S., All of Block "0", Plan M-1859 and Part of Virginia Street, Registered Plan 2570, City of North York (The Municipality of Metropolitan Toronto) . Said easements to be granted for the nominal con- sideration of $2.00, subject to the City of North York being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; AND BE IT FURTHER RESOLVED THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 20. FLOOD WARNING SYSTEM -Radio Communications Network A staff communication was presented advising that in this final year of a four-year programme for the development of the Radio Communications Network for use in the Flood Warning System, and for normal day-to-day operations, it is proposed to acquire in 1979 the following equipment from Canadian Motorola Electronics Company: .8 mobile radios .2 portable radios .miscellaneous equipment as required at a total estimated cost of $15,000.00. Res. 1176 Moved by: Mr.s. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The acquisition from Canadian Motorola Electronics Company of Q mobile radios, 2 portable radios and miscellaneous equipment, at a cost not to exceed $15,000.00, be approved. CARRIED; 21: . COMMUNITY RELATIONS PROGRAMME -Water Resource Division A staff communication was presented having regard to a proposed 60-second colour movie for use on television, depicting the hazards of spring flooding and describing the Authority's Flood Warning System. A proposal has been received from Amaranth Productions for a l6mm colour 60-second 'television spot' at a cost not to exceed $3,850.00. Res. '77 Moved by: Dr. T.H. Leith Seconded by: E.V. Kolb RESOLVED THAT: The firm of Amaranth Productions be retained to produce , a 60-second l6mm colour "television spot" on flood control and flood warning, at a total estimated cost of $3,850.00. CARRIED; B-40 -10- 22. WATERFRONT PROJRCT 1977-1981: -Bluffers Park Phase II, Launching Ramps & Day Mooring Docks A staff communication was presented having regard to the construction of permanent launching ramps and day mooring facilities at the above location. The design of these facilities has been completed by the Toronto Harbour Commissioners Engineering Department, and tenders have recently been received, as fallows, for the construction of two double concrete launching ramps, with vertical tie-up walls: Disher Farrand Limited $199,900.00 Bermingham Construction 217,900.00 Canadian Dredge & Dock 229,225.00 Dean Construction Company 236,220.00 Tripp Construction Limited 239,575.00 Hadovic Construction Ltd. 339,872.00 Funds for these works are contained in the 1979 development budget for Bluffers Park, Phase II. Res. In Moved by: E.". Card Seconded by: J.S. Scott RESOLVED THAT: The contract for the construction of the launching ramps and day mooring docks at Bluffers Park Phase II be awarded to Disher Farrand Limi ted, in the amount of $199,900.00, subject to the concurrence of the Ministry of Natural Resources. CARRIED; 23. HYDROLOGIC MODELLING TECHNIQUES -Proposed Standardization Programme: University of Ottawa A staff communication was presented having regard to a programme proposed by the university of Ottawa to standardize and simplify hydrologic modelling techniques. The Authority would be one of many users participat- ing in this study and the costs of the programme will be financed by a contribution of each participant of $3,000.00. Res. #79 Moved by: Dr. T.H. Leith Seconded by: E.H. Card RESOLVED THAT: The Authority participate in the review and development of standardization of storm water modelling as proposed by the University of Ottawa at a cost of $3,000.00. CARRIED; 24. WATERFRONT PROJECT 1977-1981: -Bluffers Park Phase II, Federal Assistance A staff communication was presented having regard to information recently received from the Small Craft Harbours Branch of Fisheries and Environment Canada that $250,000.00 is available from 1978 funding to continue the Small Craft Harbours Assistance Programme at Bluffers Park. Res. 180 Moved by: Mrs. L. Hancey Seconded by: M.W.H. Biggar RESOLVED THAT: The Small Craft Harbours Branch of Fisheries and Environment Canada be advised that The Metropolitan Toronto and Region Conservation Authority accepts its proposal to purchase and transport materials to be used in the final armouring of the Bluffers Park project, in the amount of approximately $250,000.00; and THAT The Small Craft Harbours Branch be requested to give every con- sideration to allocating additional funds within the 1979 budget to com- plete the armouring of Bluffers Park Phase II; AND FURTHER THAT the Authority express its thanks to the Small Craft Harbours Branch and the Federal Members involved for the continuing support of the Bluffers Park project. CARRIED; -11- B-41 25. ONTARIO PARKS ASSOCIATION CONFERENCE, THUNDER BAY, ONTARIO, AUGUST 2-4, 1979: -Attendance at A staff communication was presented advising that the Ontario Parks Association is arranging its 27th Annual Conference August 2-4, 1979 at Thunder Bay. The theme of this year's conference is Vandalism: Its causes and Some Contemporary Solutions. Res. 181 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: Mr. w. Mulholland be authorized to attend the Ontario Parks Association Conference in Thunder Bay, August 2-4, 1979; and THAT his expenses, in an estimated amount of $300.00, be paid, AND FURTHER THAT Mr. Mulholland and other members of staff attending this conference present a report to the Executive Committee following the conference. CARRIED; 26. FOURTH HYDROTECHNICAL CONFERENCE, VANCOUVER, B.C., MAY 7-11, 1979 -Attendance at A staff communication was presented advising that the Canadian S9ciety of Civil Engineers is holding the Fourth Hydrotechnical Conference in Vancouver, B.C. May 7-11, 1979. The theme of this conference will be River Basin Management and Cold Climate Hydrology. Res. #82 Moved by: Mrs. L. Hancey Seconded by: R.G. Henderson RESOLVED THAT: Messrs. J.C. Mather and T.E. Farrell be authorized to attend the Fourth Hydrotechnical Conference, to be held in Vancouver, B.C. May 7-11, 1979; and THAT their expenses in connection therewith, in an estimated amount of $1,400.00, be paid. CARRIED; NEW BUSINESS 27. QUOTATION #79-17 -Fire Fighting Equipment A staff communication was presented advising that the following quotations have been received for the supply and delivery of 21 fire brooms, 21 pack pumps and 30 one-hundred-foot lengths of fire hose: Brooms Pumps ~ Dyer & Miller Brothers Limited $10.50 $72.61 $82.95 Wajax Industries Limited 20.76 82.14 91.41 The above prices do not include Provincial Sales Tax. Res. 183 Moved by: Mrs. J.A. Gardner . Seconded by: E.V. Kolb RESOLVED THAT: The quotation received from Dyer & Miller Brothers Limited for the supply and delivery of 21 fire brooms. @ $10.50 each, 21 pack pumps @ $72.61 each, and 30 one-hundred-foot lengths of fire hose at $82.95 each, in the total amount of $4,233.81, plus Provincia~ Sales Tax, be accepted; it being the lowest quotation received. CARRIED; -.----- 8-42 -12 28. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Family Leisure Centres of Canada Limited To develop the 'Vaughan Theme Park', located south of Major l-tackenzie Drive, east of Highway #400, Town of Vaughan (Don River Watershed) A staff communication was presented advising that an application has been received for a permit to develop. the 'Vaughan Theme Park' at the above location. Res. 184 Moved by: Dr. T.H. Leith Seconded by: M.J. Breen RESOLVED THAT: The staff communication, together with the application of The Family Leisure Centres of Canada Limited, be received; and THAT the application of The Family Leisure Centres of Canada Limited for a permit to develop the 'Vaughan Theme Park', located south of Major Mackenzie Drive, east of Highway i400, Town 0 f Vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) All developments being undertaken as shown on the plans submitted to the Authority; (b) Detailed design of the "Grist P-1ill" and liThe Hoedown" structures located in the flood plain being submitted to the Authority for review, and to illustrate that these structures will not be adversely affected by flood waters, nor that they will be an appreciable obstruction to the flood waters; (c) Good construction practices being employed in an effort to minimize the silting of the creek; (d) Erosion protection being placed upstream and downstream of the bridge crossings; (e) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Town of Vaughan; , ( f) The Town of Vaughan Engineering Department being satisfied with the storm water management scheme. CARRIED; 29. KIPLING AVENUE - PROPOSED EXTENSION -Lake shore Boulevard to the Waterfront MRS. GELL advised that the Board of Control of the Borough of Etobicoke has requested a meeting of representatives of Humber College of Applied Arts and Technology, The Metropolitan Toronto and Region Conservation Authority and the Dorough of Etobicoke Engineer, to present a joint report on the advisability of extending Kipling Avenue from Lakeshor~ Boulevard to the Waterfront. The College has appointed a representative and it was suggested that Mr. Garrett represent the Authority. It is imperative that this meeting be convened and the report of the ~ agencies submitted to the Board of Control as soon as possible. 30. EXECUTIVE COMMITTEE AGENDA -Format MRS. GELL requested that the staff investigate the possibility of reproducing the Agenda on both sides of the paper as is the practice for reproduction of the Minutes. 31. ADJOURNMENT On Motion, the Meeting adjourned at 12:20 p.m., March 28. MRS. F. GELL, Vice Chairman K.G. HIGGS Acting Chairman Secretary-Treasurer 197 9 BUD GET REV I S ION S PAGE: 37 PROGRAM: Conservation & Recreation Land Management - Conservation & Niagara Escarp. Land (C2) DATE: March 21. 1979 PURPOSE: To acquire Conservation Area Lands as set out in the Authority's plan for ancillary conservation measures. The purpose of such acquisitions is to bring into public ownership environmentally important lands such as source and headwater areas. FUNDING: This p~gram will be financed from Authority funds. The Project RL-26 "A project for the Extension of the Palgrave Forest and Wildlife Conservation Area" was previously approved by the Executive and the Authority last year (Resolution #332). but funds were not available at that time. 12 8 ~ ~ ~ I . . > w . ell I 1 9 7 9 BUD GET REV I S ION S .. .. PAGE: -2L PROGRAM: Conservation & Recreation Land Management - Cons. & Niagara Escarpment Land (C2) DATE: ~Iarch 21. 1979 o RIG I N A L BUDGET REV I SED BUDGET Sources of Financing Sources of Financing Net Provincial Municipal Net Provincial Municipal ACT I V I T Y Expenditures Grant Levy Other Expendi tures . Grant Levy Other Conservation Area Land - - - - 48,800 - - 48,800 1 9 7 9 BUD GET REV I S ION S PAGE: 15 PROGRAf1: Operations and Maintenance - Black Creek Pioneer Village Operations DATE: 1979-03-12 PURPOSE: To re-allocate activities to give a clearer picture of the financial operation at Black Creek Pioneer Village FUNDING: There is no change in total funding (I) n = t:\I t:l C t"' t:\I III '" I III olio = U1 CD I 1 9 7 9 BUD GET REV I S ION S .. PAGE: ~ Q\ ~:::~r;p.Ar1: Operations and Maintenance - Black Creek Pioneer Vi11aae Operations DATE: 1979-03-12 o RIG I N A L BUD GET REV I SED BUDGET Sources of Financing Sources of Financing Provincial Municipal Provincial lolunicipal ACTI\'ITY Expendi tures Grant Levy Revenue Expenditures Grant Levy Revenue Admi ni strati on 174.500 174.500 178 .000 178.000 Building Staff & Internal Activities 285.750 72.000 213.750 338.600 72.000 266.600 'Gate House 14.250 14.250 16.500 16.500 Gift Shop J74.750 174.750 122.600 122.600 li ves tock 51 .500 51.500 55.500 55.500 Maintenance of Buildings 69.750 69.750 64.000 64.000 Maintenance of Grounds 51.500 51.500 49.300 49.300 Registrar 23.750 23.750 21.500 21.500 Security 18.500 18.500 18.400 1B.400 Special Days. Events. Displays 13.000 13.000 13.000 13.000 Wedding Program 5.500 5.500 5.600 5.600 Winter Program 6.250 6.250 6.000 6.000 Admission Receipts (405.000) 405.000 (405.000) 405.000 Endowment Fund Interest ( 10.000) 10.000 ( 10.000) 10.000 Food Services ( 40.000) 40.000 ( 40.000) 40.000 Photography ( 4.000) 4.000 ( 4.000) 4.000 Sales Outlets (275.000) 275.000 ~275.000) 275.000 .Weddings ~ 14 .OOO~ 14.000 14.000) 14.000 Rentals & Miscellaneous 2.000 2.000 ( 2,000) 2.000 889.000 72,000 67,000 750,000 889,000 72,000 67,000 150,000 1 9 7 9 BUD GET REV I S ION S PAGE: 49 PROGRAM: Historic Sites Development DATE: March 21, 1979 PURPOSE: To bring into line the approvals and availability of funds from Wintario and the Foundation. FUNDING: The Metropolitan Toronto and Region Conservation Foundation and Wintario. fn n ::c l'2 g t"' l'2 ll:I " I n .. . -.J ll' I 1 9 7 9 BUD GET REV I S ION S .. IX) PAGE: ~ PROGRAM: Historic Sites Development DATE: ~1arch 21. 1979 o RIG I N A L BUD GET REV I SED BUDGET Sources of Financing Sources of Financing Net Provincial Municipal Net Provincial Municipal ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other Roblin's Mill 1.000 - - 1.000 - - - - Boardwalk 1.000 - - 1.000 - - - - Taylor Cooperage (Incl. HER 12013) 30.000 - - 30.000 30,000 - - 30.000 Richmond Hill ~mnse 10.000 - - 10.000 18.000 - - 18.000 Collection 6.000 - - 6.000 - - - - Original Wintario Submission ('DIE CAP 17449) - - - - 917 - - 917 Sawyer's House - 33 1/3\ ) 12.000 - - 12.000 12.000 - - 12.000 - Furnishings 50\ ) 60.000 - - 60.000 60.917 - - 60.917 1 9 7 9 BUD GET REV I S ION S PAGE: ...!L- PROGRAM: Operations - Maintenance - Community Relations - Information & Education DATE: March l2, 1979 Operations o RIG I N A L BUD GET REV I SED BUDGET Sources of Financing Sources of Financing Net Provincial Municipal Net Provincial Municipal ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other Albion Hills C.F.C. - - - - - - - - Boyd C.F.C. - - - - - - - - Claremont C.F.C. - - - - - - - - Cold Creek C.F.C. - - - - - - - - Lake St. George C.F.C. - - - - - - - - General Interpretive Program - - - - - - - - B.C.P.V. Pioneer Life Program 10,000 - 10,000 - 13,000 - 10,000 3,000 B.C.P.V. Tour Program 31,300 - 31,300 - 33,300 - 31,300 2,000 Kortright 55,000 18,000 32,000 5,000 55,000 18,000 32,000 5,000 U) n :x: t:J g I:"' t:J al - : I 0" :\1) . .\ III 1979 CURRENT-BUDGET ESTIMATES I VI 0 PROGRAM OPERATIONS & l~INTENANCE - CO~~1UNITY RELATIONS - INrORMATION & EDUCATION OPERATIONS PAGE --D..:.- PURPOSE: To provide an outdoor and conservation education programme for school students and other community groups at four Conservation Field Centres and a variety of outdoor and conservation education opportunities for the general public and school groups at the Kortright Centre for Conservation and at the Black Creek pioneer villa~e. 1979 OBJECTIVES: _ a continuation of the programme at the same level of service as in 1978 for existing facilities _ the opening of the Kortright Centre Building for public use _ to provide an outdoor and conservation education programme for the following estimated number of students and adults: - Black Creek Pioneer Village 64,000 - Conservation Field Centres 15,500 - Albion Hills Conservation Farm 9,000 - Maple Syrup Days 31,000 _ Special Days, Field Trips, Claireville Darn Tours etc... 12,000 - Kortright Centre for Conservation 50,000 ?':~:nI~G : Program revenues and the General Levy on all participating municipalities. A surplus or deficit on the operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited to the participating boards of education. A grant of $18,000 fron the Provincial Xinistry of Culture and ~ecreation.is estimated for the operation of the Kortright Centre for Conservation and The Metropolitan Toronto and Region Conservation Foundation Kortrip,ht Centre Growth Endo~~ent Fund ($5.000). FI~ANCIAL COMMENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures. The net cost to the municipalities is estimated at $73,300, a decrease of $30,000 over 1978 budget. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages utili ties Equipment Property & Rents Taxes Expenses Total $ $ $. $ $ $ $ $ 467,200 140.500 38,300 - 213,000 - - 859.000 1979 CU::~REr~T 8L;DGcT ES-firiA:iES PR~:;~:'M OrER,\TIONS 6 mIXTEt\,\:'IiCE - CO~~IUXITY RELATIO:-:S - It{FOR,..ATION 6 EllllCATION OrERr\TIO~S ?,-~ 14, -". - 1 19i!) BUDGET r SOURCES OF FINANCING ) 1578 ACTUALS 1975 EC:)C:~T I :'CTlVITY NET PROVINCIAL MUN!CIPAL I EXPEl\:OITUF.::S I -X==-"j'-"==-~ I i EXPENDITURES REVENUES EX?ENDITURES GRANT LEVY OTHER REVENUES Ii Co . _to .1""'...:.;:) ~~V~~~:.:~S , i I : Albion Hills C. F .C. 147,500 147.500 - - - - 126,035 131,793 1011,000 IoU ,000 Bard C.F.C. 167,000 167,000 - - - - 165,597 165,597 155,000 155,000 Claremont C.F.C. 151,500 151.500 - - - - 146.151 146,099 141,000 142.000 Cold Creek C.F.C. 36,500 36.500 - - - - 38,671 37 ,13-~ 3.a,OOO 35.000 take St. George C.F.C. 68,500 68,500 - - - - - - - - .Albion Hills Farm ) 18,201 8,.a14 30,100 :?i,OOO I IAlbion Hills Operations ) IXCLUDED I . GE~ER:\L IXT RPRETJ\'E rROGI ~I 656 - 3,.100 3.800 i Sruce' s ~Ii 11 ) 2,515 2,515 I 3,000 I 3,000 ;General Interpretive Prog. 10,500 10,500 - - - - - - - - iE.CoP.V. Pioneer Life 37,500 24,500 13,000 - 10,000 3,000 37,835 23,8iO 43,000 :?1,700 I. ,.. "\' T 73,000 39,700 S3,SOO I - SI,SOO 70.770 31,814 I 74,000 :?5,000 .. . _ 0' 0 0 ours 2,000 ! i:ort ri ght 167,000 112,000 55,000 18,000 32,000 5,000 93,711 25,826 I 85,000 37,000 , Farm Conversion - - - - - - 63,894 54,007 I - - I . I I ! , I I ; I J I J I\.. I - )( i I 101 , 300 ) ( 18,000 I 73,300 I 10,000 )( 764,OS6 I 62i,069 )( 709,500 I 591.500 )'r i TOT,\L 859,000 75 1~ 700 . U1 .... UI I 1 9 7 9 '" BUD GET REV I S ION S N PAGE: .ll.- PROGRAM: Water & Related Land Management - Community Relations (Development) W.lO DATE: March 12,1979 o RIG I N A L BUDGET REV I SED BUD GET Sources of Financing Sources of Financing Net Provincial t-Iunicipal Net Provincial t-Iunicipal ACT I V I T Y Expenditures Gr:lnt Levy Other Expenditures Grant Levy Other Kortright 292,472 41,800 34,200 216,472 - - - - Albion Hills C.F.C. 12,000 - - 12,000 7,000 - - 7.000 Lake St. George 171,722 - - 171,722 - - - - 1979 CURRENT BUDGET ESTIMATES PROGRAM Water-and Related Land Management - Co~unity Relations (Development), (WlO) PAGE 21. PURPOSE: To develop the facilities required for the Authority's Outdoor and Conservation Education Programs. 1979 OBJECTIVES: - the development of trails, outdoor exhibits and demonstrations at the Boyd Conservation Education Complex - completion of the construction, initial furnishings, equipment and exhibits for the Kortright Centre for Conservation - to carry out the construction and development of the Lake St. George Conservation Field Centre FUNDING: For the development of the Kortright Centre for Conservation, 55% of the funding is from the Province of Ontario, the balance from the General Levy. For the Exhibit Program. the $216.472 is dependant on funds from The Metropolitan Toronto and Region Conservation Foundation and from Wintario. $12,000 for the improvement of the Albion Hills Conservation Field Centre ~ill be funded from special revenue. OBJECTIVE CLASSIFICATIONS: . Materials Salaries Supplies & Real Services Financial & t-1a~es Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 170,425 200,000 - - 100,769 - - 471,194 tlI I U1 W 1979 CURREr~T ."'U:-\'''' ....- ESTiiJiATES tj LlL;c i Cll I 22, U1 P~O~~~t.r' WATER & RELATED L\:'<:D ~IA.'I/'\CE~IE:\'T - CO~l.\!U:'<:JTY RELATIO~S (DE\o'ELOP~IENT) (In 0) P".::- .. ~\J_ f li EX;:EN!)!TUR:.5 1979 BUDGET SOURCES OF FINANCING 1978 ACTU:\LS 1978 BUr-GET ACTIVITY REVEi\:UES NET PROVINCI.\L MUr-.::CIPAL OTHER EX;:ENCliU?ES REVE!I.'UES ~X::::-"D'TU-S I R::'\ .::-..' 'c-- EXPEND!TUF\ES GRANT LEVY to . -.. :'\ I - .-....-;) I KOTtt:.ight 292,472 - 29~,472 41,800 34,200 216,472 171,085 - 190,000 - Albion Hills C.F.C. ~,OOO - 7,000 - - 7,001) - - - - Lake St. George 171,722 - 171,722 - - 171,722 788 - I - - I I 1 I I I I I I I I , j , , -L ... . ~[ '. 471,194 )( I 34,200 I 395,194 I )( TOTAL )( - 4~71~194 I .. I 41,800 )( 266,649 - 288,000 I - ) . m: . ExeCutive Ccmn.ittee, M.T.R.C.A., '3/79 RE: Administration of Ontario Regulation 735/73- - November and Dec:ellber, 1978 .AND Janucu:y and February, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Town of Vaughan V-218, York Excavating Ltd.., Filling stopped and the area re-shaped. , West bank of the Don River NoveIlber 2, 1978 ~ of 8635 Keele Street Borough of North York V-219, Villa Paving Ashphalt Fill renoved.. East bank of the Ete~ Creek November B, 1978 ~ of 3350 Weston a:>ad . Town of Ca1edon (Albion) Site visit nade and it was agreed to let them West bank of the Hunber River V-220, Edelweiss Sports Centre OOIlplete the tile !!led, seed or sod sane when West side of Glasgow Road, November 7, 1978 weather permits. Has very little iJrpact on IDt 9, Concession 6 storage of flood waters. Town of Caleoon (Albion) West bank of the Hunber River V-221, Virginia Aggregate Q)., As al:xJve. West side of Glasgow lbad, November 7, 1978 IDt 9, Concession 6 City of Branpton Has stopped "-'Ork on valley and watercourse. South side of 17th Line, V-222, Mr. W. Ololodny West of 8th Q)ncession November 17, 1978 No clean-up of area. No contact by phdne or letter. tn Pt. IDt 17, Concession 8 n ::x: t1j c G:: t" 1979.03.19 t1j tXI /It I t1j U1 = U1 . ._- '. tll '1'0: Executive Carmittee, M.T.R.C.A., #3/79 I U'I Administration of Ontario Regulation . 735/73 - November 'and DeceIrber, 1978 0'1 RE: AND .. Jammry and February," .1979. 2. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN , Borough of Etobicoke N:>rth side of Rathburn lbad V-223, Blyth Hill Holdings Filling stopped. East of Martin Grove lbad November 20, 1978 Area presently under discussion with our staff Lot 12, Concession 1, Reg. Plan 4532 and the Borough of Etobicoke staff. '!OWn of Riclmond Hill V-224, Mr. Luigi parravano East branch of the Don River .. We have a letter from Mr. Parravano stating he will , Rear of 16 Kersey Cras." November 20, 1978 renove fill and clean up the property to our , East of Bathurst Street satisfaction in Spring 1979. N:>rth of \oJe1drick ,!bad 1 . Pt". Tnt- -.II., 'WV~ , '!OWn of Richnond Hill East branch of thE:i Don River V-225, Coreydale Contracting As above. Rear of 16 Kersey Cres., November 20, 1978 East of Bathurst Street N:>rth of \oJeldrick Ibad pt. Lot.43 _ Concession 1 WYS Borough of Etobicoke V-226, Fe:r:mar Paving Ltd., Filling stopped. N:>rth side of Rathburn lbad Area presently under discussion with' our staff and East of Martin Grove lbad November 20, 1978 the Borough of Etobicoke staff. Lot 12, Concession 1 Reg. Plan 4532 . '!OWn of Pickering South of Hwy. 401 V-227, Mrs.. Orsola Massara Being dealt with by Pickering by-law (road West of R>sebank lbad South November 20, 1978 allowance) N:>rth of Toyndale Permit application ;in process. Lot 8, pt. ":/ & 9, ~ge 1, R.P. 230 . 1979.03.19 /It , ro: Executive Camlittee, M.T.R.C.A., #3/79 RE: AC:ninistration of Ontario Regulation 735/73 - NoventJer and Deceaber, 1978 AND Januaxy and February" 1979. 3. LOCATION VIOLATION NOTICE ISSUED ACTION TAI<EN Tor1n of Pickering SOUth of Hwy. 40l V-228, Mr. M:!rsina Par As per previous page. west of R:>sebank lbld SOUth November 20, 1978 North of Toyndale IDt 8, pt. & & 9, Range 1, R.P. 230 V-229 Destroyed. Borough of Etobiooke Wast bank of Mimioo C%eek V-230, Mr. Joseph SZybalski. Filling stopped. East of Residence at i55 oaJcfield lbld November 28, 1978 Area re-shaped by owner. Tor1n of vaughan North side of Teston lbld V-23l, Cbreyda1e Omtracting Cb. Filling stopped. Wast of Bathurst Street OWner and engineering firm presenting discussing pt. IDt 26, Concession 2 December 12, 1978 with Ml'a:A staff. I):)n River wate~ Tor1n of Vaughan North side of Teston lbld V-232, Mr. F. Andriano Wast 'of Bathurst Street DeoeIIber 12, 1978 As above. pt. rot 26, Concession 2 I):)n River watershed 1979.03.19 /It = I UI .... #3/~9 III 'lU: Executive Calr.Ii.ttee, M.T.R.C.A., I UI Admi.nistration of Ontario Regulation 735/73 - NoveI1iJer and Decen'ber, 1978 CD RE: AND Janua%Y and February,. 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Town of vaughan West side of Keele Street V-233, Mr. !eo Persits Filling stopped. North of Iangstaff !bad December 20, 1978 Area xe-shaped. Rear of 8672 Keele Street V-234 Destroyed. 1979.03.19 /It -... B-59 , the metropolitan toronto and region conservation authority minutes Report i4/79 -~ EXECUTIVE COMMITTEE WEDNESDAY-APRIL-11-1979 14/79 -- ----------- The Executive Committee met in the Board Room, Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, April 11, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey D.W. Kitchen C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Research Planner, Planning & Policy Mrs. A.C. Deans Adm. - Conservation Land Management Division P.B. Flood Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Development Co-ordinator, Planning & POlicy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather HEARINGS: Following the Roll Call, the Meeting recessed to h9ld Hearings re: (1) Mr. Peter Darling - on behalf of - Mr. C.B. Martin City of Brampton Etobicoke Creek Watershed (2) Jerome Markson Architect - on behalf of - Toronto Jewish Congress City of North York Don River Watershed Miss L. Trivelli recorded the proceedings o~ the Hearings. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey D.W. Kitchen C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Research Planner, Planning & Policy Mrs. A.C. Deans Adm. - Conservation Land Management Division P.B. Flood Adm. - Finance Division A.D. Harris B-60 -2- PRESENT FOR THE MEETING (Contd.) Adm. - Property & Administration Division W.E. Jones Development Co-ordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather ABSENT WERE Members M.J. Breen (Jury Duty) Mrs. S. Martin MINUTES The Minutes of Meeting #3/79 were presented. Res. i85 Moved by: E.H. Card Seconded by: Dr. T.H. Leith RESOLVED THAT: The Minutes of Meeting i3/79, as presented, be adopted as if read. CARRIED; SECTION I THE EXECUTIVE COMMITTl;:E SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: 1. REPORT U/79 - FINANCE SUB-COMMITTEE AND DRAFT REPORT OF THE 1978 AUDITED FINANCIAL STATEMENT Messrs. J. Hambly, E. Ford and B. van Delft represented Clarkson, Gordon & Company. Mr. J. Hambly presented the draft report of the 1978 Audited Financial Statement. The Chairman thanked Mr. Hambly for his presentation. Report 11/79 of the Finance Sub-Committee was presented. Res. '86 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: Report #1/79 of the Finance Sub-Committee be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: 11 The 1978 Auditors' Report and Financial Statement to December 31, 1978, as prepared and presented by Clarkson, Gordon & Company, be received, approved, signed by the Chairman and Secretary-Treasurer of the ~uthority, and filed; '2 THAT a Vehicle and Equipment Pool Fund be established in accordance with the Ministry of Natural Resources' Policy,Procedures and Information Manual for Conservation Authorities; '3 THAT the Operating Fund deficit in th~ amount of $62,206.00, as at December 31, 1978, be financed from the Special Revenue Account of the Authority. CARRIED; 2. THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Appointment of New Members Mr. E.H. Card, Chairman of The Metropolitan Tqronto and Region Conservation Foundation, presented a communication with regard to the appointment of new members to the Foundation. Res. #87 Moved by: E.H. Card Seconded by: Dr. T.H. Leith -3- B-6l RESOLVED THAT: The communication from Mr. Card be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following recommendation of the Chairman, The Metropolitan Toronto and Region Conservation Foundation, be approved: THAT Dr. Walter Tovell, Head of the Ontario Museums' Support and Advisory Section, Associate Professor of the Faculty of Education of the University of TOronto and Associate Professor of the Department of Geology of the University of Toronto; and Mr. Thomas R. Webb, Assistant Vice President, Public Affairs, Bell Canada, Ontario Region, be appointed as Members of The Metropolitan Toronto and Region Conservation Foundation for a three- year period, effective May 1, 1979. CARRIED J SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 3. DECISION OF HEARING Mr. Peter Darling - on behalf of - Mr. C.B. Martin City of Brampton Etobicoke Creek Watershed Res. 188 Moved by: Mrs. F. Gel! Seconded by: 'C.F. Kline RESOLVED THAT: The application of Mr. Peter Darling, on behalf of Mr. C.B. Martin, City of Brampton (Etobicoke Creek watershed) be deferred, at the request of the applicant. CARRIED; 4. DECISION OF HEARING Jerome Markson Architect - on behalf of - TOronto Jewish Congress City of North York Don River Watershed Res. 189 Moved by: Mrs. F. Gell Seconded by: C.F. Kline BE IT RESOLVED THAT: This Executive Committee confirm the decision of. the Hearing held this 11th day of April, 1979; and THAT the application of Jerome Markson Architects, on behalf of the TOronto Jewish Congress, in accordance with Ontario Regulation 735/73, for permission to construct a seven-storey building immediately north of the existing Y.M.H.A. complex, adjacent to Bathurst Street, together with'the staff communication, be received; and THAT a permit be issued subject to the following conditions: (a) The applicant assuring the Authority, by means of detailed plans, that the proposed construction will not contribute to erosion or instability of the existing bank; (b) The applicant undertaking and complying with the recommendations of the soils' report as prepared by The Trow Group Limited; (c) The applicant complying with all existing regulations and by-laws. CARRIED J B-62 -4- 5. REPORT U/79 PERSONNEL SUB-COMMITTEE Report #1/79 of the Personnel Sub-Committee was presented. Res. #90 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Report #1/79 of the Personnel Sub-Committee be received, approved and appended as Schedule "A" of these Minutes. CARRIED; 6. REPORT n/79 RECOGNITION Sub-COMMITTEE Report #1/79 of the Recognition Sub-Committee was presented. Res. #91 Moved by: Mrs. J.A. Gardner Seconded by: E.H. Card RESOLVED THAT: Report #1/79 of the Recognition Sub-Committee, as amended, be received and appended as Schedule "B" of these Minutes. CARRIED; 7. QUOTATION #79-12 -Machinery Rental Rates: Conservation Area Development A staff communication was presented advising that the following quotations have been received for the supply of earth-moving equipment required for the development of Conservation Areas during 1979. The quotations include bulldozers, loaders, graders and motorscrapers on a per hour basis: QUOTATION RECEIVED FROM HERBERI'M. mVIS AMBLER- ~IPMENr CX>NSTRUCl'ION LTD. CDUR'rnEY REPJ\C Per Hour Rental PerHaur Per Hour $ $ $ DB Dozer ------------ 42.50 49.00 55.00 D7 Dozer ------------- 39.50 39.00 44.00 TD 15 Dozer ----------- 34 .50 - - Track IDader ---------- 32.00 33 . 00 33.00 )btor Grader --------- 28.00 33.00 34 .00 Ibtor Scraper --------- 46.00 48.00 45.00 Operator ;..--- ---- Included InclOOed Included Float lobve ---------- Included ($60.00 to Inclu1ed ($90.00 each Since this equipmant must be used in cx:rrbination, particularly with notorscrapers and dozers, it is evident that the total qootation sul:mitted by Herbert M. Davis Construction Limited is the lowest hourly rental for the necessary equiptent. , Res. i92 Moved by: E.H. Card Seconded by: E.V. Kolb RESOLVED THAT: The quotation received from Herbert M. Davis Construction Limited for the supply of earth-moving equipment for Conservation Areas' development during the 1979 season, at the hourly rental basis, be accepted; it being the lowest quotation received. CARRIED; 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of the Environment To install a sanitary sewer as Phase II of proposed York-Durham Sewage Scheme, extending north a distance of 3l69m, crossing Langstaff Road on the east side of Keele St., Town of Vaughan (The Regional Municipality of York) , Don River Watershed A staff communication was presented advising that an application has been -5- B-63 received for a permit to install a sanitary sewer at the above location. Res. #93 Moved by: Mrs. L. Hancey Seconded by: M.W.H. Biggar RESOLVED THAT: The staff communication, together with the application of the Ministry of the Environment, be received: and THAT the application of the Ministry of the Environment for a permit to undertake the construction of a sanitary sewer as Phase II of the proposed York-Durham Sewage Scheme, extending north a distance of 3l69m crossing Langstaff Road on the east side of Keele Street in the Town of Vaughan (The Regional Municipality of York), Don R~ver watershed, be approved, subject to: (a) All manholes being equipped with water-tight covers; (b) Every effort being made to minimize the silting of the river during construction; (c) Every effort being made to minimize the disturbance of the existing vegetation in the valley; (d) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Town of vaughan; (e) An easement being obtained to enter and do work on Authority- owned lands. CARRIED; 9. WATERFRONT PROJECT 1977-1981: ETOBICOKE SECTOR, COL. SAMUEL BOIS SMITH AREA -Property: Her Majesty the Queen in Right of Ontario Res. 194 Moved by: J.S. Scott Seconded by: Mrs. J .A. !Gardner RESOLVED THAT: The Report (March 27, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: Project: WATERFRONT PROJECT 1977-1981 Etobicoke Sector Colonel Samuel Bois Smith Area Authori ty: Executive Resolution No. 460, Meeting No.23 - January 21, 1976 and Authority Resolution No.46, Meeting No.3 - April 9, 1976. Subject Property: South side of Lakeshore Blvd. Owner: Her Majesty the Queen in Right of Ontario Area to be Acquired: 1.194 acres, more or less Recommended Purchase Price: $100.00 "Included in the requirements for the above-noted project is a parcel of land, being part of the bed of Lake Ontario, in front of Block "A" and Lakeshore Drive, Registered Plan 1592, Borough of Etobicoke, The Municipality of Metropolitan Toronto, having a frontage of approximately 203 feet on the south side of Lakeshore Blvd., west of 5th Street in the New Toronto Area. "Negotiations have been conducted with offiqials of the Ministry of Natural Resources, and, subject to the approval of your Committee, agree- ment has been reached with respect to a purchase price, as. follows: The purchase price is to be $100.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All reason- able expenses incurred incidental to the closing, for land transfer tax, B-64 -6- legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Func!ls are available. MAn application has been made to the Mini,ster of Natural Resources for an Inspection Certificate." 10. INTERIM WATER & RELATED LAND ~rnNAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT - DON RIVER \oJATERSHED -Property: The Governing Council of the University of Toronto and Connaught Laboratories Limited Res. #95 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The Report (Apr il 3, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED liRe: project: Interim Water and Related Land Management Project 1979-1981 - Flood Plain and Valley Land 'Acquisition Component - Don River Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.5l, Meeting No.3, April 21, 1978 Subject Property: South side of Fisherville Road OWners: The Governing Council of the university of Toronto and Connaught Laboratories Limited Area to be Acquired: 0.921 acres, more or less Recommended Purchase Price: The nominal consideration of $2.00 "Included in the requirements for the above-noted project is a rectangula~- shaped parcel of land, being Part of Virginia Street, as closed by a Judge's Order dated October 26, 1944, City of North York, The Municipality of Metropolitan Toronto, located on the south side of Fisherville Road, east of Davey Street. "Negotiations have been conducted with officials of the University of Toronto and Connaught Laboratories Limited and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $2.00, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. All r~ason- able expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. liThe Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 11. THE CORPORATION OF THE BOROUGH OF SCARBOROUGH -Request for Authority-owned Land Res. '96 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey . RESOLVED THAT: A parcel of Authority-owned land, containing 0.05 acres, more or less, be conveyed to the Corporation of the Borough of Scarborough, for the construction of a walkway running westerly from Kennedy Road, north of Sheppard Avenue East. Said land being Part of Lot 29, Concession III, Borough of Scarborough, The Municipality of Metropolitan Toronto. -7- B-65 Consideration to the nominal sum of $2.00; and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78, as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 12. REPORT U/79 WATERFRONT ADVISORY BOARD Report il/79 of the Waterfront Advisory Board was presented. Res. '97 Moved by: E.V. Kolb Seconded by: D.W. Kitchen RESOLVED THAT: Report 11/79 of the Waterfront Advisory Board be received; and THAT Recommendations #1, 12 and 13, as set forth herein, be approved: n The Delegation - for WARD 9 Citizens' Association, Shoreline Stabilization - Eastern Beaches, City of Toronto, be advised that the proposed works are within the existing priorities established by the Waterfront Advisory Board and that the work will be carried out if additional funds are made available; and That the Chairman of the Authority be requested to make a sub- mission to the Province of Ontario for approval of additional funds to permit the Authority to undertake urgent shoreline management projects; and ' That the Borough of Scarborough, the City of Toronto, the Borough'of Etobicoke and The Municipality of Metropolitan Toronto be requested to support the Authority's application to the Province of Ontario for additional funds for urgent shoreline management projects, E The 1979 Waterfront Environmental Monitoring Programme, involving an estimated expenditure of $48,775.61, be approved; and That the firm of Proctor and Redfern be retained as the programme consultant. !l The staff be directed to construct and place a test section of floating tire breakwater, approximately 25 feet wide and 200 feet long, in the area of Crescentwood Road in the Borough of Scarborough, at an estimated cost of $20,000.00. CARRIED; 13. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT: 1979-1981 Humber River at Oak Ridges - Preliminary Engineering Study -Extra Work Order A staff communication was presented advising that additional soils information is required in order to analyze the possibility of filling the marsh areas and its effects on flood levels. Res. 198 Moved by: Dr. T.H. Leith Seconded ~y: C.F. Kline RESOLVED THAT: The proposal received from the ~irm M.M. Dillon Limited to carry out additional soils and hydraulic analyses required on the Humber River at Oak Ridges, in the amount .of $2,500.00, be approved. CARRIED; B-66 -8- 14. INTERIM WATER AND RELATED LAND MANAGEMENT PLAN -Proposal for Flood Damage Analyses and Alternative Remedial Works A staff communication was presented advising that the next and last stage of background data analysis, having regard to the above, is to determine the number of existing flood-vulnerable areas, using the new flood lines, the extent of their vulnerability and to then determine alternative measures for their protection. A proposal has been obtained from James F. MacLaren Limited for this work, in the amount of $86,100.00. Res. 199 Moved by: Mrs. J.A. Gardner Seconded by: Dr. T.H. Leith RESOLVED THAT: The firm James F. ~1acLaren Limited be retained to carry out a "Flood Damage Analyses and Alternative Remedial Works" study, in the amount of $86,100.00. CARRIED; 15. QUOTATION '79-19 -Claireville Conservation Area Visitor Service ?rogrammes: Canoe Trailer A staff communication was presented advising that in the development of the Small Craft Programme for the Visitor Service Programmes in the Claireville Conservation Area this summer, a trailer will be required to transport up to eight canoes at a time, together with the lifejackets, paddles and associated equipment necessary to the programme. Res. UOO Moved by: Mrs. F. Gell Seconded by: Mrs. L. Hancey RESOLVED THAT: The purchase of one canoe trailer from J. Ardill for the Small Craft visitor Service Programme at the Claireville Conservation Area, in the sum of $650.00, be approved. CARRIED; 16. ONTARIO SKI RESORTS ASSOCIATION ANNUAL CONVENTION: MAY 7-9, 1979, CONSTELLATION HOTEL, TORONTO -Attendance at A staff communication was presented, advising that the Ontario Ski Resorts Association - through which skiing conditions and facilities are reported through the news media - is having its annual convention May 7-9, 1979. A number of agenda items will be of value to the operation of the Authority's ski programmes, including advertisement, promotion, rental shOp operation and discussions on cross-country, skiing programmes, education programmes and the snow reporting system. The Authority is a member of the Association. Res. UOl Moved by: E.H. Card Seconded by: C.F. Kli,ne RESOLVED THAT: Mr. Andy Wickens, Recreation Programmes Supervisor, be authorized to attend the Ontario Ski Resorts Association Convention ~t the Constellation Hotel, Toronto, May 7-9, 1979, and that his expenses, in the amount of $42.00, be paid. CARRIED; 17. URBAN DRAINAGE MANAGEMENT IN ONTARIO -Report of the Urban Drainage Policy Committee A staff communication was presented advising that the Chairman is in receipt of the above-mentioned report from the Co-Chairman of the Committee. Res. 1102 Moved by: M.W.H. Biggar Seconded by: Dr. T.H.Leith -9- B-67 RESOLVED THAT: The staff communication, together with summary of the Report of the Urban Drainage Policy Committee, be received; and THAT the Urban Drainage Policy Committee be advised that: (a) The Authority is in receipt of the report of the Urban Drainage POlicy Committee and that the Authority supports the principles contained therein; (b) The Authority recognizes the key role which it can play, together with its municipalities, in drainage planning and is in the final stage of preparing a Watershed Plan which will provide drainage guidelines for this region; (c) The staff has been requested.to meet with the Committee to discuss the most appropriate means of expediting implementation of those policies with which the Authority is concerned. CARRIED; 18. LAKE ST. GEORGE CONSERVATION FIELD CENTRE: -Quotations for Septic Tank System A staff communication was presented advising that the following quotations have been received for two septic tanks required for the Lake St. George Conservation Field Centre. Both systems contain 2,000 gallon tanks, the one for the dining area having 800 lineal feet of tile, and the one for the dormitory having 600 feet of tile. eontractor Total Amount George Harding $10,289.00 Albert Grigsby $10,200.00 Harry Smith 9,320.00 Len Robinson No Bid Res. n03 Moved by: E.H. Card Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The quotation of Harry Smith for the installation of the septic system at the Lake St. George Conservation Field Centre, in the sum of $9,320.00, be accepted; it being the lowest quotation received. CARRIED; 19. FINERY INVESTMENTS LIMITED -Reconveyance of Land Res. U04 Moved by: J.S. Scott Seconded by: C.F. Kline WHEREAS as part of the approval process of .the Subdivision , Development Plan M-25l, approved in 1978 for the City of Mississauga, the following draft condition was imposed: "14 Prior to final approval of the Plan, arrangements shall have been made to the satisfaction of the City and The Metropolitan Toronto and Region Conservation Authority regarding the future disposition of Block "C". WHEREAS on 23rd March, 1978, Finery executed a transfer of all of Block "C", Plan M-25l, City of Mississauga, for a nominal consideration to the Authority. Finery apparently having executed the deed on advice from the City and/or Finery's consultants that the Authority would not release the draft plan without a conveyance to it of Block "C". This being a wholly mistaken view by Finery as to the Authority's requirement. ~ WHEREAS on 25th April, 1978, the Planning D~partment of the City of Mississauga wrote to the Authority and, after having made reference to the aforementioned draft condition, sought from the Authority "a statement as to the anticipated long term use of Block "c" in accordance with the Authority's interest in the property." B-68 -10- WHEREAS on 2nd ley, 1978, the Authority replied that the "property does not fall within any current pcquisition plans of this Authority", and on 31st May again communicated with the City, this time indicating that the Authority "would have no objection to condition No. 14 of the Minister's conditions of the final approval dated 14th March; 1977, being deleted." WHEREAS on 24th November, 1978, the transfer of Block "C", Plan M-25l, City of Mississauga to the Authority by Finery for a nominal consideration was registered on title by the City of Mississauga allegedly on behalf of the Authority but, without any express or implied authority to so do. AND WHEREAS based on the facts and on an opinion provided to the Authority by its solicitor, Mr. John B. Conlin, Q.C., to the effect that the registration of the transfer was made in error. THEREFORE BE IT RESOLVED that Block "C", Plan M-25l, City of Mississauga, be forthwith reconveyed to Finery Investments Limited; AND FURTHER THAT the appropriate Authority officials be authorized and directed to execute such documents as required to give effect thereto. CARRIED; 20. HALF WAY HOUSE DINING ROOM -Dishes and Glassware - A staff communication was presented advising that dishes and glassware are required for the dining room operation at the Half Way House, Black Creek Pioneer Village,. Motion Moved by: C.F. Kline Seconded by: J.S. Scott ; RESOLVED THAT: Dishes and glassware be purchased Ior the Half Way House dining room from the Royal Doulton Group at a price not to exceed $3,200.00, excluding taXi and THAT the purchase be ;unded from the Food Services Equipment Reserve Account. ' . . THE MOTION WAS-----------------------------------------------NOT CARRIED; Amendment Moved by: lM.W.B. Biggar Seconded by: E.V. Xolb RESOLVED THAT: Dishes and glassware be purchased for the Half Way House dining room from the Royal Doulton Group at a price not to exceed $3,200.00, excluding taXi and THAT the purchase be funded from the Black Creek Pioneer Village Operations and Maintenance Budget. THE AMENDMENT WAS--------------------------------------------NOT CARRIED; Res. nos Moved by: . Rrs. F. Gell Seconded by: E.H. Card RESOLVED THAT: The Administrator of the Historical Sites Division be requested to review the report and recommendations regarding the purchase of dishes and glassware for Half Way House and ,submit a ,further report to the next meeting of the Executive Committee1 and THAT samples of dishes and glassware be made available for inspection by the Committee. CARRIED; NEW BUSINESS 21. 1979 YORK COUNTY SCIENCE FAIR MRS. HANCEY advised the members that she had represented the Authority at the 1979 York County Science Fair on April 7, 1979. . . : ." -11- B-69 Res. 1106 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Authority provide complimentary Season's Passes to the winners in the Conservation category at the 1979 York County Science Fai~, held Saturday, April 7, 1979. CARRIED; 22. EXECUTIVE COMMITTEE MEtTING '5/79 .." The Secretary-Treasurer advised the Committee that the next regular meeting is scheduled for Wednesday, April 25, 1979, and will be held at this office. Lunch will be served at the Kortright Centre for Conservation, to be followed by a meeting with The Regional Municipality of York. 23. ADJOURNMENT On Motion, the Meeting adjourned at 1:05 p.m., April 11. , .J R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer B-70 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PERSONNEL SUB-COMMITTEE REPORT /11 /7,9 The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive, DOWNSVIEW, Ontario on Thursday, March 29, 1979, commencing at 10:00 a.m. PRESENT WERE Chairman Mrs. L. Hancey Members E. V. Ko1b Dr. T. H. Leith Authority Chairman R. G. Henderson Authority Vice-Chairman Mrs. F. Gell Secretary-Treasurer K. G. Higgs Director, Planning & Policy Staff W. A. McLean Administrator, Finance Division A. D. Harris ABSENT MEMBERS Members M. J. Breen Mt"s. S. Martin THE FOLLOWING ITEMS WERE DISCUSSED:- 1) Appointments, Transfers and/or Promotions to the Full Time and Full Time Probationary Staff; 2) Finance Division - Classification Level Changes; 3) Memberships in Organizations, Publications, Conferences, Conventions Seminars and Training Courses; 4) In-Service Training Course - Information and Education Division; 5) Responsibilities - Director of Planning and Policy; 6) Moving Expenses. IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS:- 1) APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS TO THE FULL TIME AND FULL TIME PROBATIONARY STAFF THAT the following appointments, transfers and/or promotions be made to the Full Time and Full Time Probationary Staff:- . a) Appointments to the Full Time Staff Name Position Effective Date P. Garland Livestock Man, B.C.P.V. No-vember 26/78 V. ~erry Clerk Typist February 4/79 M. Miller Accounting Assistant February 4/79 T. Hay Assistant Gardener, B.C.P.V. January 21/79 w. S. Kerr Labourer February 19/79 b) Appointments to the Full Time Probationary Staff Name Position Effective Date M. E. Miller Accounting Clerk December 11/78 L. M. Bryla Secretary January 15/79 A. M. Morris Secretary March 5/79 J. A. Silk Secretary December 11/78 A. Hayton Project Biologist February 26/79 J. Haggart Clerk Typist April 2/79 L. Wilson Building Manager I March 27/79 (Albion Hills) B-71 Report fll/79 Page 12 Personnel Sub-Committee APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS TO THE FULL TIME AND FULL TIME PROBATIONARY STAFF (continued) c) Promotions within the Full Time Staff Name Position Effective Date A. Vernest Works Superintendent, February 26/79 Lake St. George February 5/79 M. Dziedzic Senior Secretary D. Osborne Supervisor, Property Management February 5/79 M. Giffin Assistant Works Superintendent January 29/79 D. Hebert Building Manager II March 19/79 d) Transfers within the Full Time Staff Name Position Effective Date J. Wansbrough Cons. Education Supervisor, September 1/79 Albion Hills 2) FINANCE DIVISION, CLASSIFICATION LEVEL CHANGES THAT the positions of Accounting Assistant (General) and Accounting Assistant. (Payables) of the Finance Division be upgraded from Cl~ssification Level 2 to Classification Level 3 and that the Personnel Manual be amended accordingly. 3) MEMBERSHIPS IN ORGANIZATIONS, PUBLICATIONS, CONFERENCES, SEMINARS AND TRAINING COURSES THAT the Association and/or Society Memberships, publications, con- ferences, conventions and seminars, attached to this Report as Appendix I, be authorized for 1979 and that the estimated fees, listed as follows, be paid:- Memberships ........................ $ 3,156.25 Publications ....................... 690.00 Conferences ........................ 11,752.00 Total Estimated Cost for 1979 $ 15,598.25 4) IN-SERVICE TRAINING COURSE - INFORMATION & EDUCATION DIVISION THAT Ms. Mercedes Ruano be authorized to attend the courses: Introduction to Computers and Introduction to Management Accounting during the next Autumn/Winter term and that the fees in the amount of $240.00 be paid. 5) RESPONSIBILITIES - DIRECTOR OF PLANNING & POLICY THAT the Report re Responsibilities - Director of Planning & Policy together with the recommendations therein, attached to this Report as Appendix II, be approved for inclusion in the Personnel Manual. B-72 Report ~ll/79 Personnel Sub-Committee Page 13 ~) MOVING EXPENSES THAT the policy with regard to Authority requested moving expenses, attached to this ReP9rt as Appendix III, be approved fo~ inclusion in the Personnel Man4al. . , Mrs. L. Hancey, Chairman K. G. H~ggs, Secretary-Trea~urer :wr 1979.0.3.30., B-73 APPENDIX 1 TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A. Meeting '1/79 - Thursday, March 29, 1979 RE: MEMBERSIIIPS IN ORGANIZATIONS AND PUBLICATIONS, CONFERENCES, SEMINARS AND TRAINING COURSES 11 IS RECO~~ENDED T.~T the following Association and/or Society Memberships and publications, conferences, conventions and seminars be authorized for 1979 and that the fees in connection therewith be paid:- \ 1) MEMBERSIIIPS IN ORGANIZATIONS (Total Estimated Cost $3,156.25) , Executive and Senior Staff Executive and Senior Staff . Soil Conservation Society of America Corporate Membership . Metropolitan Toronto Board of Trade Finance Division A. D. Harris . Municipal Finance Officers Association C. A. Francis . The Society of Management Accountants of Canada c. A. Francis . Financial Management Association Property & Administration W. E. Jones . Right-of-Way Association D. J. Princ'e . Appraisal Institute of Canada -..-. Information & Education ....."...... " T. E. Barber . Convention & Tourist Bureau " . American Association for Cons. Information , . Cons. Education Association . Field Studies Council K. W. Strasser . Federation of Ontario Naturalists . Canadian Nature Federation A. Foster . Interpretation Canada T. Carr . Federation of Ontario Naturalists . Outdoor Canada . The Archaeological Society of Ontario . Canadian Nature Federation . Council of Outdoor Educators of Ontario A. Hayhoe . Early American Industries . Ontario Museum Association R. Hudson . Council of Outdoor Educators of Ontario . Federation of Ontario Naturalists . National Science Teachers Association . Canadian Wildlife Federation J. Wansbrough . Council of Outdoor Educators of Ontario . Federation of Ontario Naturalists . Canadian Nature Federation . Ontario Camping Association Historical Sites . R. K. Cooper . Living Historical Farms & Agriculture Museums . Early American Industries Association . Ontario Historical Society . The Assoc. for Preservation.Technology . York Pioneer & Historical Society . Pennsylvania German Folklore Society of Ont. . National Assoc. of Watch & ,Clock Collectors . Chapter 33 National Assoc. of Watch & Clock Collectors . Artist-Blacksmith Assoc. of North America . Canadian Guild of Antique Arms Collection . Canadian Museum Association .'Society for the Preservation of Old Mills . Canadian Centre for Folk Culture Studies . Rushlight Club . .Ontario Museum Assoc. " 'I',: .,,; :.'.'..:.'~' :: ,B-74 ' Personnel Sub-Committee Meeting 111/79 Memberships. Publications.. CO'1ferences. Conventions & Seminars Page 112 MEMBERSHIPS IN ORGANIZATIONS (continued) Historical Sites (continued) J. M. Hughes. . Ontario Museum ~ssoc. . Costume Society for Ontario L. S. O'Byrne . Ontario Museum Assoc. F. Castle , ' . Ontario Museum Assoc. . , . , . Conservation'Land Management J. Agnew.,M;,MacDowell, A. Ceney.'... ';'." . Ontario Maple Syrup Producers Assoc. J. Agne~, 'S'~,:'.Bont'j-e ',., . ,Ontario Parks Assoc. J. Agnew, D. Dyce."E; Oakleaf. Ministry of Environmen~ (Pesticide Licence) P. Flood '. ,., . National & Provincial Parks Assoc. . Canadian Land Reclamation Assoc. . Canadian Parks/Recreation Assoc. D. Dyce . Ontario Shade Tree Council E. Oakleaf . Ontario Shade Tree Council . Canadian Nature Federation A. Freeman . Federation of Ontario Naturalists . Soil Conservation Society of America Water Resourc~,' .DiVi s ion .,':p.: '"" M. R. Garrett'" " .. American Society for Civil Engineers I. . International Assoc, for Great Lakes Research . , . The Canadian Society for Civil Engineers . American Public Works Assoc. J. C. Mather . Canadian Water Resources Assoc. . American Public Works Assoc. B. E. Denney . International Assoc, for Great Lakes Research . American Pub 1 ic Works Assoc,' A. G. Sahabandu . The Soil Conservation Society of America w. ~. Mulholland . Ontario Parks Assoc. R. W., Dewell, . Canadian Land Reclamation Assoc. R. Saadia .. . The Soil Conservation Society of America J. D. Tucker . The Soil Conservation Society of America 'T. E. Farrell . Can~ian Parks/Recreation Assoc. . American Institute of Planners Planning & Policy Staff W. A. McLean . Canadian Parks Assoc. J. W..Maletich . American Planning Assoc. A. C. Deans . Soil Cons, Society of America 2) PUBLICATIONS (Total Estimated Cost $690.00) Property 6 Administration Secretaries in All Divisions . Canadian Secretary Magazine Historical .Sites.Division R. IC.' Coopel '. . ' . Pennsylvania Folklife " . Ant iques . The Canadian Collector .. Ontario Showcase . The Auctioneer . The Canadian Journal Arms Collection " . Iron Horse Antiques Inc. B-75 Personnel Sub-Committee Meeting 111/79 Memberships. Publications. Conferences. Conventions & Seminars Page '3 PUBLICATIONS (continued) Information & Education D. deVerteuil . Photo Life . Petersen Photographic . Canadian Kodak Company . Popular Photography . Photo Canada . Canadian Photography IC. W. Strasser . National Audubon Society . Harrowsmith ~agazine A. Foster . The Chickadee . Gleamings in Bee Culture . The New York Conservationist . Scientific American . The Owl T. Carr . Canadian Geographic Journal . Ontario Field Biologist . Volunteer . The Bulletin . New York Conservationist . National Audubon . Harrowsmith Magazine A. Hayhoe . Harrowsmith Magazine . Early American Life R. Hudson . The Owl . The Ontario Milk Producer . The Ranger Rick . The New York Conservationist P. Head . Marketing Magazine J. Wansbrough . The Owl . Harrowsmith Magazine . The New York Conservationist . Canadian Geographical Journal Conservation Land Management S. Bontje . Foremanship (distribution to all work centres) A. Freeman . Demographic Bulletin P. Flood . Foundation for Aggregate Studies A. Wickens . Directory of Community Services 3. CONFERENCES, TRAINING COURSES AND SEMINARS (Total Estimated Cost $11.752.00) Authority Members & Senior Staff IC. G. Higgs . S.C.S.A. Annual Meeting. Ottawa. July 29/79 Authority Members and Senior , Staff . Conservation Authorities Tour - Sept. 30/79 ~ Oct. 3/79 Property & Administration W. E. Jones . Right-of-Way Seminar - Toronto. June/79 D. J. Prince . Appraisal Institute of Canada - Toronto. May/79 Historical Sites R. ~. Cooper . Ontario Museum Assoc. - Barrie. October/79 J. M. Hughes . Ontario ~fuseum Assoc.' - Barrie. October/79 L. O'Byrne . Ontario Museum Assoc. - Barrie, October/79 F. Castle . Ontario Museum Assoc. - Barrie. October/79 B-76 Personnel Sub-Committee Meeting 111/79 Memberships, Publications, Conferences, Conventions & Seminars Page '4 CONFERENCES, TRAINING COURSES AND SEMINARS (continued) Information & Education T. E. Barber . Study Tour of ' Nature Centres, Washington, D.C. Fall of 1979 T. Carr . Residential Outdoor Education Workshop, Boyne River, April 6-8/79 . S.C.S.A. Annual Meeting, Ottawa - July 27-30/79 . The Council of Outdoor Educators of Ontario October/79 A. Hayhoe . Ontario ~fuseum Assoc. - Barrie, October/79 A. Foster . Interpretation Canada - Vancouver - October/79 R. Hudson . Ontario Camping Assoc. - Boyne River, April 6-8/79 . Exchange Program with Leslie Frost Centre, Dorset Conservation Land Management D. Dyce, E. Oakleaf . Ontario Shade Tree Council, October 17-19/79 A. Freeman . Recreation Resource Planning & Design Institute Michigan State U. - April 22-25/79 D. Dyce, E. ,Oakleaf, S. Bontje . Effective Superivision - Human Relations Course Humber College - March 20 - April 12/79 J. Agnew, S. Bontje . Ontario Parks Annual Conference - Thunder Bay August 2-4/79 J. Agnew, M. MacDowell, A. Ceney . Maple Syrup Producer's Association 1) Information Day - Elmvale - January 19/79 2) Summer Tour - Kemptville, July/79 3) Annual Meeting - Dorset, October 26-27/79 20 C.L.M.D. Supervisory Staff. Ontario Conservation Authorities Supervisors Workshop - St. Thomas - September 18-20/79 P. Flood . Canadian Parks/Recreation Assoc. Annual Meeting Windsor - August l2-~6/79 Water Resource Division J. C. Mather . Fourth National Hydrotechnical Conference - Vapcouver A. G. Sahabandu . Urban Drainage II - Vancouver T. E. Farrell . Fourth National Hydrotechnical Converence - Vancouver Planning & Policy Staff w. A. McLean . Canadian Parks Assoc. - Windsor A. C. Deans . Soil Cons. Society of America - Ottawa NOTE: Authority Members attendance at Conferences, Conventions, Training Courses and Seminars In accordance with Ontario Municipal Board Order #R.4873/7l, members of the Authority may attend conferences, conventions, training courses .nd seminars and their actual costs involved are covered by the Authority when said costs are necessarily occurred in the conducting of the busi- t ness of the AuthoritY1 under the direction of the Executive Committee. :wr 1979.03.20. 8-77 APPENDIX II TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A. Meeting il/79 - March 29, 1979 RE: RESPONSIBILITIES - DIRECTOR OF PLANNING AND POLICY The Secretary-Treasurer is the chief adminis'~rative officer of the Authority responsible to the Executive Committee for the management of the Authority's work. The Director of Planning and Policy is responsible to the Secretary- Treasurer for the coordination of planning and for program and project development. He has been assisting in the day to day administration of the resource management divisions - Water Resource, Conservation Land Management, Historical Sites and Information and Education. I , I propose to include in the Director of Planning and Policy's responsibilities the administration of the resource management divisions. This modification will clarify lines of responsibility, and will assist in creating, among those divisions, a coordinated and cohesive unit for our resource management work. This proposal can,be effected by amending the Personnel Manual of the Authority to reflect the following structure: ~I DIRECTOR OF PLANNING AND POLICY FINANCE PROPERTY CONSERVATION WATER INFORMATION HISTORICAL AND LAND 'RESOURCES AND SITES ADMIN. MANAGEMENT EDUCATION RECOMMENDATION: IT IS RECOMMENDED THAT the Personnel Manual be amended to provide as follows: SECTION I - SENIOR STAFF add position description Director of Planning and Policy POSITION: Planning and Policy Director CLASS. LEVEL: 11 TERMS OF REFERENCE The Director of Planning and Policy, in the absence of the Secretary- Treasurer, shall assume all of the responsibilities of the Secretary- , Treasurer and be a signing officer of the Authority. . The Director of Planning and Policy is responsible to the Secretary- Treasurer for the administration of planning coordination, project and program development and operations of the resource management divisions - Water Resource, Conservation Land Management, Historical Sites, Information and Education, and the Development Control Staff. QUALIFICATIONS & EXPERIENCE . - a thorough knowledge of administrative practices and procedures - a thorough knowledge of resource management planning techniq~es, practices and procedures . - a thorough knowledge of provincial and municipal government affairs - ability to coordinate inter-divisional staff activities - a thorough knowledge of conservation B-78 Personnel Sub-Committee Meeting #1/79 Responsibilities - Director of Planning and policy Page 2 SECTION J - PLANNING AND POLICY STAFF Page J-l to read: Function of Development Control Staff The Development Control Staff is responsible to the Director of Planning and Policy for the review and preparation of Authority comments on development proposals, the plans and policies of other levels of government, .and for the administration of Regulations made under The Conservation Authorities Act for fill, construction and alteration to waterways. The lines of responsibility of each of the following personnel descriptions are set out in the Development Control Staff organization chart. Page J-2 title to read - Development Control Staff _ Staff Committee on Planning and Policy to read: Director of Planning and Policy Secretary-Treasurer Division Administrators Support staff as required. Page J-3 - Delete . Pages M-3, N-3, 0-3, P-3 to read: Terms of Reference To be responsible to the Director of Planning and Policy for the administration of the ...............Division. K. G. Higgs Secretary-Treasurer XGH/mm 1979.03.20. . APpJlNDIX 'II B-79 ~ the metr9Politan toronto and region conservation authority . PAGE: B-15 Personnel .Manual EXEQJTIVE Nt (p Employee Policies and Regulations DATE: .. Authority Requested - Moving Expenses RESOLUTION Nt When an employee is transferred at the request of the Authority, he/she shall be eligible for the re-imbursement of the relocation expenses which are actually incurred, subject to the conditions and limits outlined below:- /' \ 1) The employee is being transferred from a position requiring an Authority residence to a position also requiring an Authority residence. 2) The foll~wing expenses are permissible in connection with the transport of household effects:- , .. - the cost of crating, packing, unpacking, cartage and reasonable insurance against breakage, loss in transit etc.. . NOTE: To avoid any misunderstanding about pick-up, delivery, payment of invoices etc..., instructions to the mover should be detailed in writing o~ an Authority purchase order and acknowledged by the movers. Movers' invoices ~st be approved by the Administrator of the Division responsible and shoul~ be paid by the Authority directly. ' , , ' \ . , B-80 SCHEDULE "B~ THE METROPOLITAN TORONTO AND REGlqN CONSERVATION'AUTHORITY Report il/79 April 2, 1979 ~cognition Committee Meeting 12:30 p.m. The Recognition Committee met at the Authority Office, 5 Shoreham Drive (Humber Room), Downsview, on Monday, April 2,1979, commencing at 12:30 p.m. PRESENT WERE: Mrs. E. Gardner Chairman F. R. Perkins Member M. M. R. Stewart Member W. A. McLean MTRCA staff P. Head M. Ruano The following matters were considered: (1) Nominations - 1979 Honour Roll Awards (2) Program - 1979 Honour Roll Awards (3) Program - Service Recognition Awards (4) Recognition poiicy .. IT WAS AGREED AND THE CO~1MI~TEE RECOr::NDS: 1. Nominations.- 1979 Honour Roll Aw rds THAT the fol~owing people be nominated to receive an Honour Roll Award in 197~,: The Hon. James Auld Mr. Jesse Bryson Mr. George Dyce Dr. G. Ross Lord Mr. Fred Lurin Mr. Preston Sewell Mr. John Weir (deceased) 2. Program - 1979 Honour Roll Award presentation , . THAT the following changes be made in the format of the tree planti~g ~ny,: (a) FOl19win9 the presentation,~f all awards and brief response from recipients, the trees be planted simultaneously;, (b) Guidelines for presentors and recipients be prepared, recomme~ding brief remarks; , (c) The "T~ee Bees" be invited to participate in the pr~gram in rec~gnition of the International Year of the Child; \ (d) The ~ate of the ceremony be set in May, at a time convenient to the Hon. James Auld, if possible. 3. Program - Service Recognition Awards THAT the following members receive Lifetime Passes: Mr. Michael W. H. Biggar (1974-1978) Mr. Emil V. Kolb (1974-1978) Mr. Gordon F. R. Norton (1974-1978) THAT the following receive Gold Recognition Awards: Mr. Frank McKecpnie (1958-1978) ~HAT Mr. Willi~ Davidson, Q.C. recei~e a GOld Recognition Award this year, AND FURTHER THAT the Service Recognition Awards be pre~ented at the annual Spring Garden Party, in conjunction with the opening of the Sawyer's H~use at the Black Creek Pioneer Vill~ge~ ...2... " - 2 - B-8l Report il/79 April 2, 1979 Recognition Committee Meeting 12:30 p.m. 4. Other Business THAT the Service Recognition Award Policy be amended to delete the stated times and locations of the presentation of the awards, in order to afford more flexibility. Mrs. Edna Gardner Mercedes Ruano Committee Chairman Secretary WAWmrp 1979.04.05 !I ~ , B-82 the metropolitan toronto and region conservation authority minutes Report '5/7~ -- ---------- EXECUTIVE COMMITTEE WEDNESDAY-APRIL-25-l979 15/79 --- -- - --- ------------ The Executive Committee met in the Board Room, Authority Office~ 5 Shoreham Drive, Downsview, on Wednesday, April 25, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members W.G. Barber M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Property & Administration Division W.E. Jones Research' Planner, Planning & Policy Mrs. A.C. Deans Development Co-ordinator, Planning ,& Policy J.W. Maletich. Planning Technician, Planning & ~olicy Miss A. Aitkel\ Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau Project Engineer-Dev.,Flood Control Section, WRD A.G. Sahabandu, , HEARING Following the Roll Call, the Meeting' recessed to hold a Hearinq reI O.T. Baggio & Associates Limited -on behalf of- Reuben Parnes Town of Markham Rouge River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell , ,Members W.G. Barber M.W.H. Biqgar B.H. Card Mrs. J .A. Gardner Mrs. L. Hancey c.r. Kline Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs .birector of Planning & Policy W.A. McLean Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Diyision P.B. Flood Adm. - Water Resource Division .M.R. Garrett Adm. - Property & Administration Division W.E. Jones Executive Secretary Mrs. K. Conron Research Planner, Planning & Policy Mrs. A.C. Deans Head, Waterfront Section, Water Resource Divn. B.E. Denney Development Co-ordinator, Planning & Policy J.W. Maletich B-83 -2- Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau Supervisor, Property Administration, P&AD D.J. Prince Project Eng~neer-Dev.,Flood Cont. Section, WRD A.G. Sahabandu ABSENT WERE Members M.J. Breen (Jury Duty) E.V. Kolb Mrs. S. Martin MINUTES The Minutes of Meeting '4/79 were presented. Res. n07 Moved by: E.H. Card Seconded by: Mrs. F. Gell RESOLVED THAT: The Minutes of Meeting '4/79, as presented, be adopted as if read. CARRIED, SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY SECTION II I THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE CO~TTEE: 1. STAFF FINANCIAL PROGRESS REPORT -January 1 to March 31, 1979 The staff presented a Financial Progress Report for the period January 1 to March 31, 1979. Res. 1108 Moved by: Mrs. F. Gell Seconded by: E.H. Card ; RESOLVED THAT: The Staff Financial Progress Report for the period January 1 to March 31, 1979, be received and appended as Schedu~e "A" of these Minutes. CARRIED, DR. LEITH advised the members that a letter has been received from CSCS';''l'V stating t~~t Channel Eleven is pleased to have donated air time during the months Jun~-October and December 1978 to the value of $42,200:00 on behalf of the AuthC?:dty. 2. THE CHAIRMEN'S COMMITTEE OF THE ONTARIO CONSERVATION AUTHORITIES -Proposed Expansion of Chairmen's Committee Office At the request'of the Chairman, the Executive Committee considered the proposal of The Chairmen's Committee of the'Ontario Conservation Authorities regarding the proposed expansion of the Chairmen's ,Committee office by the 'engaging of a full~time Secretary-Manager/Executive-Secretary. The Executive Committee reviewed the proposed ~erms of Reference for a full-time Secr~tary-Manager/Executive-Secretary.and the estimated cost of the expanded operations, together with the proposed levy on The Metropolitan Toronto and ~e~ion Conserv~tion Authority. Considerable d~scussion took place with respect to this proposal. -3- B-84 Res. fl09 Moved by: J.S. Scott Seconded by: C. F. Kline WHEREAS The Metropolitan Toronto and Region Conservation Authority supports The Chairmen's Committee of the Ontario Conservation Authorities, and the role and function that the Committee presently performs in presenting a common viewpoint to the Government of the Pr~vince of Ontario in matters affecting conservation authoritiesJ AND WHEREAS there are, within the conservation authorities of Ontario, substantial staff resources to provide the necessary background information and analysis which reflect the concerns of individual authorities and groups of authorities which it would be difficult for staff of the Chairmen's Committee to provide; AND WHEREAS the Authority is of the op~nion that matters of policy affect- ing individual authorities or groups of authorities are the responsibility of such authorities or groups of authorities; THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region Conservation Authority advise The Chairmen's Committee of the Ontario Conservation Authorities that it does not support the proposal to engage a full-time Secretary-Manager/Executive-Secretary on the basis set out in the proposal received under date of April 5, 1979; AND BE IT FURTHER RESOLVED THAT The Authority would not support the pro- posed levy to finance the expansion of the Chairmen's Committee office. CARRIED, 3. OUOTATION i79-0l r Petticoat Creek Conservation Area -Picnic Table Material A staff communication was presented advising that the following quotations have been received for the supply and delivery of material for the con- struction of picnic tables at the Petticoat Creek Conservation Area: Card Lumber $1,802.74 Cadillac Building Products 1,814.29 Oriole Lumber Limited 1,914.25 Hanford Lumber 1,9~0"30 The above prices include Federal and Provincial sales taxes. Res. 1110 Moved by: C.!'. Kline, Seconded by: Mrs. J .A. Gardner RESOLVED THAT: The quotation received from Card Lumber for the supply and delivery of picnic table material for th~ Petticoat ,Creek Conservation Area, in the sum of $1,802.74, be accepted, it being the lowest quotation received. CARRIED, 4. QUOTATION t79-0lA Petticoat Creek Conservation Area -Picnic Table Frames A staff communication was presented advising that the following quotations have been received for the supply and delivery of 90 steel frames for the construction of picnic tables at the Petticoat Creek Conservation Area: Muskoka Docks Limited $52.97 ea. Ressco Recreat~on Inc. 60.68 II Henderson Recreation Equ~pment 78.11 II The above steel frames include Federal and Provincial sales taxes. Res. U11 Moved by: E.H. Card Seconded by: Mrs. L. Haneey RESOLVED THAT: The quotation received from Muskoka Docks Limited for the supply and delivery of 90 picnic table frames for the Petticoat Creek Conservation Area in the sum of $52.97 each be accepted, it being the lowest quotation received. CARRIED, B-85 -4- 5. QUOTATION #79-15 -5 Stihl Chain Saws A staff communication was presented advising that the following quotation has been received (from the 8 invitations) for the supply and delivery of 5 Stihl chain saws, with trade: Outdoor Power Equipment $1,853.19 Res. #112 Moved by: M.W.H. Biggar Seconded by: W.G. Barber RESOLVED THAT: The quotation received from Outdoor Power Equipment for the supply and delivery of 5 Stihl chain saws with trade, in the'sum of $1,853.19, including Federal and Provincial sales taxes, be accepted. CARRIED; 6. QUOTATION *79-18 -Rear Half of Tree Spade A staff communication was presented advising that the following quotation has been received for the supply and installation of rear half of tree spade: Vermeer of Canada Limited $6,678.27 The above price includes Federal and Provincial sales taxes No competitive price is available since Vermeer is the exclusive distributor for Canada. I Res. 1113 Moved by: E.H. Card Seconded, by: Dr. T.H. Leith RESOLVED THAT: The quotation received from Vermeer of Canada Limited for the supply and installation of the rear half of the tree spade, in the sum of $6,678.27, be accepted. . CARRIED; 7. ADDITIONAL PROVINCIAL CASH FLOW: PROVINCE OF ONTARIO -Fiscal Year 1978-l979 A staff communication was presented advising that the Ministry of Natural Resources has advised the Authority that addi tional grant has been approved. Res. 1114 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey, RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority, accept from the Ministry of Natural Resources additional ~ash flow from 1978"funding, amounting to; $165,990.00~ and ~ I THAT budget revisions be made where necess~ry. CARRIED, 8. EXPERIENCE '79 A staff communication was presented advising that the Authority has been invited to participate in the Ontario Government's special summer employ- ment programme - Experience '79, at total funding allocation of $118,290.00. Res. .115 Moved by': Mrs. L. Hllncey Se~nded by: M.W.H. Biggar RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority participate in the Experience '79 Programme, within the funding established by the Ministry of. Natural Resources, and that allocations to Divisions be made by staff. CARRIED, -5- B-86 9. FINANCIAL REPORT AND ACCOUNTS -March, 1979 Mr. Scott presented the Financial Report and Accounts for the mont~,of Marcb, 1979. Res. 1116 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Financial Statement for the month of March, 1979, be received; and the Authority Accounts, in the amount of $1,330,449.00, being (a) Current Expenditures - W~ges and Salaries $374.709.00; Materials and Supplies $236,644.00; (b) Capital Expenditures - Wages and Salaries $31,655.00; Materials and Supplies $687,441, be approved for paYment. CARRIED; 10. HALF WAY HOUSE DINING ROOM -Dishes and Glassware A staff communication was presented havinq regard to the following resolution adopted at Meeting '4/79 of the Executive Committee: 'Res. n05 RESOLVED THAT: The Administrator of the Historical Sites Division be requested to review the report and recommendations regarding the purchase of dishes and glassware for Half Way House and submit a further report to the next meeting of the Executive Committee; and THAT samples of dishes and glassware be made avail- able for inspection by the Committee. CARRIED, , The staff advised that the existing dishes used in the dining room operation at the Half Way House are not heavy duty quality and, as a result, there has been considerable breakage. ,It is proposed to purchase heavy duty dishes and glassware manufactured by the Royal Coulton Group. Samples were available for inspection by Committee. Res. 1117 Moved by: Mrs. F. Gell Seconded by: Dr. T.H. Leith RESOLVED THAT: Dishes and glassware be purchased for the Half Way House Dining Room from the Royal Coulton Group at a price 'not to exceed ' $7,500.00, excluding tax, and THAT the purchase be funded from the Food Services. Revenue Account. CARRIED, 11. DECISION OF HEARING 0.'1'. Baggio & Associates Limited -on behalf of- Reuben Parnes Town of Markham Rouge River Watershed Res. '118 Moved by: Mrs. F. Gell Seconded by: .C.F. Kline BE IT RESO.LVED THAT: This Executive Committee confirm the decision of the .Hearing held ~is 25th day of April, 1979; and. THAT the application of O.T. Baggio and Associates Limited on behalf of Reuben Parnes, in accordance with Ontario Regulation 735/73, for permission. to place ,fill and erect a dwelling within an area regulated by this Authority on Part .of Block 'A', R.P. 6037, also described as Part Lot 20, Concession 5,. Town of Markham (Rouge River watershed), be refQsed for the follo~ing reason: That the application, as submitted, will affect the conservation of land in that it. will be necessary to undertake considerable regrading, filling and removing existing vegeeation, which would affect the stability of the existing valley side slopes. CARRIED,. B-87 -6- 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Pe Ben Pipelines Limited To construct a storm sewer outfall into the Little Etobicoke Creek, south of Highway #401 , east of Tomken Road, City of Mississauga A staff communication was presented advising that an application has been received for a permit to construct a storm sewer outfall into the Little Etobicoke Creek at the above location. Res. illS Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Pe Ben Pipelines Limited, be received; and THAT the application of Pe Ben Pipelines Limited for a permit to under- take the construction of a storm sewer outfall into the Little Etobicoke Creek in the area south of Highway #401, east of Tomken Road, in the City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek water- shed, be approved, subject to: (a) Rip rap being placed at the upstream and downstream ends of the outfall .structure in order to protect it from further erosion; (b) Dissipators such as shute blocks being placed at the outfall in order to reduce the flow v~locities; (c) A filter mat or a 6"-12" layer of crushed stone preceding all gabion or rip rap works; (d) All areas disturbed due to construction being restored to the satisfaction of the Authority and' of the City of Mississauga. '. CARRIED; 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Buttonville Golf Club To construct an addition to existing club house, Part Lot 14, Concession 3, Town of Markham (Rouge River Wa tershed) A staff communication was presented advising that an application has been received for a permit to construct an addition to an existing club house at the above location. Res. 1120 Moved by: Mrs. L. Hancey Seconded by,: M.W.H. Biggar RESOLVED THAT: The staff communication, together with the application of the Buttonville Golf Club, be received; and THAT the application of the Buttonville Golf Club, in accordance with Ontario Regulation 735/73, .for permission to construct an addition to the existing club house within the area as defin~d in the Schedules to Ontario Regulation 735/73, being part of Lot 14, Concession 3, TOwn of Markham (R~uge River watershed), be approved, subject to: (a) No bui~ding ope~ings being situated below the storm elevation line as indicated on the plan, being 190.0 meters; (b) The proposed berm, as indicated on the plan, being deleted from the plan; (c) All surplus fill being removed from the site; (d) Every effort being made to minimize the silting of the river during construction. ' CARRIED; -7- B-88 14. COMMUNICATION FROM THE TOWN OF CALEDON -Gibson Lake Property Res. #121 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The Council of the Town of Caledon be advised that the Authority is not prepared to enter into a Lease Agreement for the Town- owned land which lies contiguous with Authority-owned land at Gibson Lake; AND FURTHER THAT the TOwn of Caledon be advised of the Authority's policy involving Acquisition of Title to Municipal and Provincial-owned lands, and the reasons for same, and that the Town of Caledon again be requested to convey title to the subject lands to the Authority for the nominal con- sideration of $2.00. CARRIED, 15. SALE OF AUTHORITY-OWNED LANDS TO ONTARIO HYDRO Res. #122 Moved by: J.S. Scott Seconded by: Mrs. F. Gel! RESOLVED THAT: The Authority convey a parcel of Authority-owned land, being Part of Lot 23, Concession IV, and Part of the Road Allowance between Concessions VI and VII, Town of Caledon, containing 9.388 acres, more or less, of vacant land, situated on the east side of Highway '50, to Ontario Hydro. Consideration to be the sum of $55,000.00, plus legal, survey, , appraisal and any other costs incurred in connection with the transaction. The deed is to include a covenant to the effect that should the land, or any portion thereof, become surplus to the requirements of Ontario Hydro, The Metropol~tan Toronto and Region Conservation Authority is to have the right to re-purchase; and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78, as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 16. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: FLOOD PLAIN AND VALLEY LAND ACQUISITION COMPONENT - DUFFIN CREEK WATERSHED -Property: B. & Y. Ing Res. t123 Moved by: M~s. F. Gall Seconded by: E.H. Card RESOLVED THAT: The Report (April 18, 1979) set forth herein, received from the Property Administrator, be adopted and that the: Secretary- Treasurer be authorized and directed to complete the transaction. CARRIED, liRe: Project: Interim Water,& Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component - Duffin Creek Watershed Authority: Executive Resolution..No. 133, Meeting No.4 _ April 12, 1978 and Authority Resolution No.51, Meeting No.3 - April 21, 1978 Subject Property: South side of Main Street, west of Market Street OWners: B. & Y. Ing Area to be Acquired: 0'.162 acres; more or less, together with a temporary working easement across an additional 0.056 acres, for a period of three years from .date of closing. Recommended $17,880.00, plus Vendors' legal costs and other Settlement considerations, as detailed below. -Included in the requirements for the above-noted' project is an irregular- shaped parcel of land, being Part of Lot 35, Concession IX, Town of Whitchurch-Stouffville, The Regional Municipality of York, being a partial taking from a larger commercial property fronting on th~ south side of I I 13-89 -8- Main Street, west of Market Street, in the downtown section of Stouffville. In addition to the land being acquired, the Authority is also to receive a temporary working easement for a period of three years from the date of closing this transaction over an additional 0.056 acre portion of the Vendors' lands for the construction of the Stouffville Channel. As a part of this transaction, the Vendors are also to relinquish their rights across an existing right-of-way running from the south side of l1ain Street to the west side of their property. "Negotiations have been conducted with the owners and their solicitor, Mr. G.C. Ness, of the legal firm Button, Armstrong and Ness, 6 Main Street East, Stouffville, Ontario, LOH lLO, and, subject to the approval of your Committee, agreement has been reached with respect to a Settlement of Compensation, as follows: The amount of compensation is to be $17,880.00, plus Vendors' legal costs. In addition, the Authority is to grant to the Vendors a permanent easement ~or access purposes across a 0.026 acre parcel of Authority-owned land, known as Part of Lot 1, Registered Plan 972, Town of Whitchurch-Stouffville, and to arrange for the paving of same. "I recommend approval of this transaction and that the legal firm of Gardiner, Roberts be instructed to complete the transaction. Al! reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authori ty 'is to receive a conveyance of the land required free from encumbrance. liThe Administrator of the Water Resource Division has reviewed this pro- posed acquisition and is in concurrence with my recommendation. , "Funds are available. "An application has been made to the Minister of Natural Resources ~or an Inspection Certificate." 17. REPORT 11/79 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD Report 11/79 of the Flood Control and Water Conservation Advisory Board was presented. Res. 1124 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey RESOLVED THAT: Report 11/79 of the Flood Control and Water Conservation Advisory Board be received; and THAT the recommendation, as contained therein and set forth 6erein, be approved: The Executive Committee be requested to take whatever steps are necessary to expedite the undertaking of erosion control works at 35 Canyon Avenue on the West Branch of the Don River; AND FURTHER THAT the opinion of the Authority solicitor be obtained regarding action which may be taken by the Authority, under The Expropriations Act, to expedite expropriation of the lands required for the works. CARRIED, 18. INTERIM WATER & RELATED LAND ~1ANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in The Regional Municipality of York: '- proposeg Remedial Work -'7374 Kipling Avenue, TOwn of Vaughan, Rainbow Creek (Humber River Watershed) A staff communication was presented advising that remedial work is proposed at the above location which will include realignment bf ove~ 50 m of the Ra~nbow Creek, riverbank armouring and revegetation of the embankment. Res. 1125 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Erosion control wQrk be carried out at the rear of .7374 Kipling Avenue, Town of Vaughan (Rainbow Creek - Humber River watershed), at an estimated cost of $16,400.00, and, THA~ the approval of the Ministry of.Natural Resources be requested. ~RRIEDJ -9- B-90 19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in The Regional Municipality of York: Proposed Remedial Work - 7440 Kipling Avenue, Town of Vaughan, Rainbow Creek (Humber River Watershed) A staff communication was presented advising that remedia~ work is proposed at the above location which will provide approximately 90 m. of rip rap protection along the existing bank and revegetation of the embank- ment. Res. #126 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: Erosion control work be carried out at the rear of 17440 Kipling Avenue, Town of Vaughan (Rainbow Creek - Humber River watershed), at an estimated cost of $14,700.00; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 20. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in Metropolitan TOronto: Proposed Major Remedial Work - 10 Codeco Court, City of North York (Don River Watershed) A staff communication was presented advising that major remedial work is scheduled to commence this year at the above location. Res. 1127 Moved by: Mrs. .L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Erosion control and slope stabilization work be car~ied out at 110 Codeco Court, Borough of North York (Don River watershed), at an estimated cost of $263,200.00; and THAT the approval of the Ministry of Natural Resources be requested. .- CARRIED; 2l. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in Metropolitan TOronto: Proposed Geotechnical Investigation of Slope Instability, Nos. 8-14 Bruce Farm Drive, City of North York (Con River) A staff communication was presented advising that a proposal has been received from Golder Associates Limited, Consulting Geotechnical Enqineers, for a Slope Instability Study at the rear of Nos.8-14 Bruce Fa~ Drive in the City of North York. Res. 1128 Moved by: Dr,. T.H. Leith, Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates Limited, Consulting Geotechnical Engineers, to carry ~ut the geotechnical study to determine the slope instability at the rear of Nos. 8-14 Bruce Farm Drive, City of North York (Don River watershed), at a cost estimated to be $7,100.00; and THAT the Ministry of Natural Resources be requested to approve thi~ study. CARRIED, 22. WATERFRONT PROJECT 1977-1981: -Shoreline Management Programme, Scarborough Bluffs Soils Consultant A staff report was presented having regard to the following recommendation of Meeting 12/78 of the Waterfront Advisory Board: "'lHAT'the staff be directed to proceed with the preparation of a detailed Master Plan, including enviro1'lllental assess- uent, for the protect.i.a1 of the Scarborough shoreline by means of a system of artificial beaches; and 'JHAT in the interim, aCXIUisitim and protection of criticial areas continue in acx:orCarx:e with existing Authority POliey. II B-91 -10- Res. #129 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: Subject to the approval of the Ministry of Natural Resources, the firm of Geocon (l975) Limited be retained tq develop design recommendations for the alignment of shoreline prote~tion and slope stabilization in the Crescentwood area of Scarborough, at a cost not. to exceed $15,000.00; and THAT the same firm be retained to undertake the first phase of the :eo- technical investigation required for the Shoreline Management Maste Plan at a cost not to exceed $25,000. CARRIED; ,NEW BUSINESS 23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Kablan Construction Limited To construct a storm sewer outfall into the Little Etobicoke Creek, south of Eglinton Avenue, west of Fewster Drive, City of Mississauga A staff communication was presented advising that an application'has been received to construct a storm sewer outfall into the Little Etobicoke Creek at the above location. Res. t 130 Moved by: Mrs. F. Gel! Seconded b~: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Kablan Const~uction Limited, be received~ and THAT the application of Kablan Construction Limited for a permit to ~der- take the construction of a storm sewer outfall into the Little Etobi oke Creek in the area south of Eglinton Avenue, west of Fewster Drive, City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed, be approved, subject to: (a) Rip rap being placed on the bank of the creek surrounding the outfall structure, and also on the creek bed in order to reduce the chances of erosion; (b) All areas disturbed due to construction being restored to the satis- faction of the Authority and of the City of Mississauga; , , (c) The City of Mississauga Engineering Department being satisfied wi~ the proposal; (d) Every effort being made to minimize the silting of the cr~ek durinq construction. CARRIED J 24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of the Environment To install a sanitary trunk sewer crossing the West Branch of the Don River, just north of Steeles Avenue, east of Dufferin Street, Town of Vaughan I A staff communication was presented advising that an application has been received for a permit to install a sanitary sewer crossing the Don River at the above location.. ' Res. 1131 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together ,with the application of the Ministry of the Environment, be received; ~nd THAT the applicati.on of the Ministry of the Environment for a permit..to undertake the installation of a sanitary trunk sewer crossing the West Branch of the Don River, in the area just north of Steeles Avenue, east of Dufferin Street, Town of Vaughan (The .Regional Municipality Of York), Don River watershed, be approved, subject to: -11- B-92 (a) All areas disturbed due to construction being restored to the satisfaction of the Authority; (b) Every effort being made to minimize the silting of the river during construction; (c) The river configuration being maintained after construction; (d) An easement being obtained to enter and do work on Authority- owned lands. CARRIED; 25. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of Transportation and Communications To realign a section of the Black Creek between Trethewey Drive and Eglinton Avenue to allow for construction of the Northwest,Metro Arterial Road, Borough of York (Humber River Watershed) A staff communication was presented advising that a~ application has been received for a permit to realign a section of the Black .Creek.at the above location. Res. #132 Moved by: Mrs. L.. Hancey Seconded by: Mrs. F. Gell RESOLVED THAT: The staff communication, together with the application of The Ministry of Transportation and Communications, be received; and THAT the application of the Ministry of Transportation and Communications for a permit to undertake the realignment and channelization of a section of the Black Creek between Eglinton Avenue and Trethewey Drive in o~der to allow for the construction of the Northwest Metro Arterial ~oad, Borough of York (Humber River watershed), be approved, subject to: (a) The Municipality of Metropolitan Toronto Parks Department being satisfied with the proposal; (b) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED,' 26. ANNUAL CONFERENCE OF THE CANADIAN MUSEUMS' ASSOCIATION: MAY 27-JUNE 1, 1979, VANCOUVER, B.C. -Attendance at . A staff communication was presented advising that Mrs. Jeanne Hughes has been elected President of the Ontario Museums' Association and has been. asked to attend the Annual Conference of the Association to represent Ontario at a meeting of the presidents of provincial associations. The O.M.A. will pay Mrs. Hughes' expenses. Res. #133 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: Mrs. Jeanne Hughes be authorized to attend the Annual Conference of the Canadian Museums' Association to be held May 27-June 1, 1979 in Vancouver, B.C. CARRIED, 27. THE MUNICIPALITY OF METROPOLITAN TORONTO -Request for Sanitary. Trunk Sewer Easement: Vicinity of Albion and Weston Roads ' A staff communication was presented advising that a request has been received from The Mun~cipality of Metropolitan Toronto to provide a permanent easement for. a sanitary trunk sewer in the vicinity of Albion and Weston Roads. The proposed easement affects Authority-owned land known as Part of Lot 155, Registered Plan M-433, Borough of Etobicoke (The ~unicipality of Metropolitan Toronto). Res. 113,4 Moved by: J.S. Scott Seconded by: M.W.H. Biggar B-93 -12- RESOLVED THAT: A permanent easement be granted to The Municipality of Metropolitan Toronto, required for a sanitary trunk sewer, in the vicinity of Albion and Weston Roads. Said easement is shown as Parts 7 and 8 on Plan 66R-9963. Authority-owned land affected is Part of Lot 155, Registered Plan M-433, Borough of Etobicoke (The Municipality of Metropoli.tan Toronto). Said easement is to be granted for the nominal consideration of $2.00, subject to The Municipality of Metropolitan Toronto being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; AND BE IT FURTHER RESOLVED THAT The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; , 28. GLEN HAFFY AND GREENWOOD CONSERVATION AREAS -Refreshment Booth Operation A staff communication was presented advising that in order to provide a service for the pu~lic, individuals ,were approached in 1978 to ~dertake the operation of refreshment booths at Glen Haffy and Greenwood Conservation Areas. Mr. Jas. E. Maguire and Ms. Karen St. Pi#rr~ operated the facilities in 1978 and both are d~~irous of cont nuing in 1979. Res. 1135 Moved by: W.G. Barber Seconded by: J.S. Scott RESOLVED THAT: Mr. Jas. E. Maguire be given the contract for the food concession in the Glen Haffy Conservation Area for the 1979 season, and that Mr. Magui~e keep exact costs of his operation during this period, maintain competitive prices for his product and operate the booth on weekends, holidays and on other occasion~ in consultation with the Super- intendent of the Area when the public is utilizing this Area, during the duration of the trout season; and I.. THAT Ms. Karen St. Pierre be given the contract for the food concession in the Greenwood Conservation Area for the 1979 season, and that Ms. St. Pierre keep exact costs of her operation during this period, maintain competitive prices for her product and operate the booth primarily during the months of July and August seven days a week and on weekends from Mhy 24 until Labour Day, as required, in consultation with the Superintendent of the Area. ,CARRIJ::D, ,I 29. CANADIAN NATIONAL EXHIBITION -Authority Participation in Metropolitan Toronto Exhibit A staff communication was Presented advising that a request has been received from the Metropolitan Toronto Chairman's office for 0UthOrity participation in the Metropolitan Toronto Exhibit at the 1979 Canadian National Exhibition. 1, Res. tl3~ Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell RESOLVED THAT: The Metropolitan Toronto Chairman's office be advised that The Metropolitan Toronto and Region Conservation Author~ty will participate in the Metropolitan Toronto Exhibit at the 1979 Canadian National Exhibition and will contribute $5,000.00 towards the cost of the exhibit, and THAT the design and description of the proposed Authority exhibit, together with suggestions for a "give..away", be submitted to the Executive Committee prior to its inclusion in MetroShow. CARRIED, 30. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Purchase of Aerial Photography A staff communication was presented advising that up-to-date aerial photo- graphy is necessary to continue the effective administration of th$ Authority's regulations and management work, and for a study in prQgress to identify and verify environmentally sensitive areas in the urba~. development zone and Upper Valleys of the watersheds. -13- B-94 Res. #137 Moved by: .Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The Authority purchase from the Province of Ontaria copies of the 1978 stereo pair aerial photography (scale 1:10,000) covering its area of jurisdiction, at a cost not to exceed $3,500.00" excluding Provincial Sales Tax. CARRIED; 31. NOTICE OF MOTIONS Mrs. F. GELL submitted the following Notice of Motions for consideration at the next regular meeting of the Executive Committee, scheduled for Wednesday, May 16, 1979: U . II Moved by: Mrs. F. Gall Seconded by: J.S. Scott THAT the registration of Committee members attending functional and watershed advisory board meetings be closed 30 minutes after the time called for the meeting." t2 "Moved by: Mrs. F. Gall " Seconded by: M.W.H. Biggar ! THAT the Annual $uqaring Off function .. sponsored by the Authority not be held in 1980; and THAT the staff take under consideration some oth~r type of function and report back to the Executive Committee." 32. The Secretary-Treasurer reminded the Members that the Honour Roll Awards ceremony will be held at the' Authority office on Tuesday, May 8, 1979, commencing at 2:30 p.m. 33. The next regular meeting of the Executive Committee will be held on Wednesday, May 16, 1979, commencing at 10:00 a.m. at the Authority office. 34. ADJOURNMENT On Motion, the meeting adjourned at'12:30 p.m., April 25. R. Grant Henderson K.G. Higgs Chairman Secretary-T~easurer .. B-95 SCHEDULE "A" STAFF PROGRESS REPORT Property Division During the period January 1, 1979, to March 31, 1979, the Property Division completed the purchase of 19 new properties con- taining 228.424 acres. The Authority also completed Settlement of Compensation on 9 properties previously expropriated. Two new properties were expropriated durin~ the period. The total acreage of lands owned by the Authority, as' of March 31, 1979, is 26,366.109 acres. The Property Division also carried out all of the routine admini- stration management required in connection with Authority owned lands, i.e. agreements, easement~, taxes, leases, rentals, insurance, etc. A breakdown of the properties and acreages acquired by the Authority to date is as follows: " FLOOD CONTROL AND WATER CONSERVATION ETOBICOKE CREEK WATERSHED 1 - Property settled during period containing .522 acres - 2 properties expropriated dur~ng period containing .970 acres - 1 purchase ~ . Total to date--60 properties acquired containing 349.391 acres; - 2 .expropriations outstanding MIMICO CREEK WATERSHED Total to date--23 properties acquirep containing 75.475 acres; HUMBER RIVER WATERSHED 3 - Properties settled during period containing 136.676 a~res - 3 purchases - Total to date--723 properties acquired containing 8,256..333 acres; - 1 expropriation outstanding , DON RIVER WATERSHED 6 - .Properties settled during period containing 19.828 acres - 6 purchases Total to date--154 properties acquired containing 1,778.259 acres, - 3 expropriations outst~nding HIGHLAND CREEK WATERSHED 1 - Property settled during period containing 2.110 acres - 1 purchase Total to date-,139 properties acquired containing 821.229 acre~; , , ROUGE RIVER VALLEY WATERSHED I 1 - Property s.ettled during period containing .~OO acres - 1 purchase Total to date--109 properties acquired containing 2,073.686 acres, DUFFIN'S CREEK WATERSHED 4 - Properties settled during period containing 52.594 acres - 4 purchas es ' . Total to date--76 properties acquired containing 885.662 acres; B-96 - 2 - CONSERVATION AREAS: - Albion Hills Conservation Area Total in Area--34 properties containing 1,044.142 acres; - Black Creek Conservation Area Total in Area--7 properties containing 113.966 acres; - Bolton Community Conservation Area Total in Area--4 properties containing 18.043 acres; - Boyd Conservation Area Total in Area--12 properties containing 991.090 acres; - Bruce's Mill Conservation Area Total in Area--2 properties containing 267.038 acres; - Cedar Mill Property Total in Area--l property containing 0.337 acres; - Claireville Conservation Area Total in Area--l property containing 28.114 acres; - Claremont Conservation Area Total in Area--5 properties containing 396.750 acres; - Cold Creek Conservation Area Total in Area--6 properties containing 467.880 acres; - Frenchman's Bay Conservation Area Total in Area--9 properties containing 49.430. acres; - Glassco Park Total in Area--l property containing 482.000 acres; - Glen Haffy Conservation Area Total in Area--ll properties containing 802.206 acres; - Greenwood Conservation Area Total in Area--14 properties containing 680.648. acres; - Heart Lake Conservation Area Total in Area--8 properties containing 380.663 acres; - Humber Trails Conservation Area Total in Area--l property containing 48.664 acres; - Oakbank Community Pond Total in Area--l property containing 9.3~0 acres; - Petticoat Creek Conservation Area Total in Area--l property containing 177.918 acres; B-97 - 3 - - Lake St. George Conservation Area Total in Area--l property containing 319.250 acres; - Tam O'Shanter Conservation Area Total in Area--l property containing 118.626 acres; FOREST AND WILDLIFE AREAS: - Gibson Lake Forest and Wildlife Area Total in Area--l property containing 137.160 acres; - Glen Major Forest and Wildlife Area Total in Area--10 properties containing 1,442.057 acres; - Goodwood Forest and Wildlife Area Total in. Area--6 properties containing 307.639 acres; - King Creek Forest and Wildlife Area Total in Area--l property containing 0.185 acres; - Palgrave Forest and Wildlife Area 1 - Property settled during period containing 15.180 acres - 1 purchase Total in Area--7 properties containing 628.432 acres; - Peter Wright Forest and Wildlife Area Total in Area--l property containing 20.939 acres; AGREEMENT, FOREST LANDS: - Uxbridge Forest and Wildlife Area Total in Area--l property containing 93.000 acres; - Humber Forest Area Total in Area--22 properties containing 1,803.165 acres; NIAGARA ESCARPMENT LANDS: TOtal in Area--4 properties containing 251.926 acres; WATERFRONT PLAN: - Project W.F.-l - Etobicoke Sector 2 - Properties settl~d during period containing 1.314 acres - 2 purchases Total to date--6 properties acquired containing 68.616 acres; - Project W.F.-2 - Ashbridge's Bay Sector Total to date--l property acquired containing 29.618 acres; - Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete) Total to date--4 properties acquired .containing 0.641 acres; B-98 - 4 - - Project W.F.-3A - Pickering/Ajax Sector (Ext. No.1) Total to da~e--149 properties acquired containing 491.013 acres; - Project W.F.-4 - Scarborough Sector 9 - Properties settled during period containing \.210 acres - 9 expropriations Total to date--5l properties acquired containing 455.568 acres - 1 expropriation outstanding SUMMARY FLOOD CONTROL AND WATER CONSERVATION: January 1 to March 31, 1979 - 16 properties settled containing 211.930 acres; 16 purchases - 2 properties expropriated Total to date--l,284 properties acquired containing 14,240.035 acres, - 6 expropriations outstanding; CONSERVATION AREAS: January 1 to March 31, 1979 - Total to date--120 properties acquired containing 6,396..115 acres; FOREST AND WILDLIFE AREAS: January 1 to March 31, 1979 - 1 property settled during period cont~ining 15.180 acres; Total to date--26 properties acquired containing 2,536.412 acres; ! AGREEMENT FOREST LANDS: January 1 to March 31, 1979 - Total to date--23 properties acquired containing 1,896.165 acres, NIAGARA ESCARPMENT LANDS: , ~ January 1 to March 31, 1979 - Total to date--4 properties acquired containing 251.926 acres; WATERFRONT PLAN: January 1 ,to March 31, 1979 - 11 properties settled during period containing 3.524 acres 2 purchases - 9 expropriations Total to date--211 properties acquired containing 1,045.456 acres, - 1 expropriation ou~standing; GRAND TOTAL OF ALL PROJECTS January 1 to March 31,1979 -'28 properties settled containing 230.634 acres; -' 19 purchases and 9 expropriations - 2 properties expropriated during period, Total to date--1668 properties acquired containing 26,366.109 acres; - 7 expropriations outstanding. B-99 TO: The Chairman and Members of the Executive Committee, M.T~R.C.A. Meeting '5/79 - Wednesday, April 25, 1979 RE: STAFF PROGRESS REPORT '1/79 - J~~UARY 1 T9 MARCH 31, 1979 - FINANCE DIVISION Total To \; of Forecast t Budget March 31/79 Budget Dec. 3l/7~ ADMINISTRATION $ $ $ Revenues 70,000 15,152 22 70,000 - -, Expenditures Salaries 560,150 147,942 26 560,150 Employee Benefits 440,500 114,180 25 440,500 Travel Expenses 97,500 11 ,607 11 97,500 Vehicles & Equipment 36,000 9,310 26 36,000 Materials & Supplies 81,500 27,815 34 81,500 Rent Ii Utili,ties 77,250 15,211 20 77,250 General Expenses 54,100 4,726 9 54,100 - 1,347,000 330,791 25 1.347,000 - - Expenditures are on budget for the following activities:- salaries, employee benefits, travel expenses, vehicles and equipment and general expenses. Materials Ii Supplies Uniforms and Equipment 7,500 7,743 103 7,500 Postage 16,000 4,441 27 16,000 Stationery and Office Supplies 50,000 7,429 15 50,000 Office Equipment 8,000 8,201 102 8,500 - 81,500 27,814 34 82,000 - - a) Uniforms and Equipment expenditures represent purchases for inventory and are reduced as recoveries are made from sales to employees. b) Postage expenditures are on budget. c) Stationery and Office Supplies are on budget for this activity. d) Office Equipment expenditures include payment for service contracts for office equip- ment for the year. It is estimated this account will be overspent by $500.00 as a result of higher cost of service contracts. Rent Ii Utility Services: Expenditures are on budget for this activity'based on projected expenditures for the balance of the year. Total To , of Forecast to Budget March 31/79 Budget Dec.. 31/79 GENERAL OPERATIONS $ $ '. Revenues Rental Properties etc... 16.S0~ 18,307 111 22,000 Interest (net) - (10,055) - - - 16,500 8,252 50 22.000 - . Expenditures - Office Cleaning 19.000 4,254 22 19,000 Office Maintenance 32,000 7,316 22 32,000 Other Expenditures 61,000 5,018 8 61,000 - 112.000 16,588 IS 112,000 - - Expenditures to date are comparable with anticipated budget levels. ADH: wr Alan D. Harris Administrator Finance Division 1979.04.17. THE CHAIRMAN AND MEMBERS OF THE EXECUTrvE COMMITTEE, M.T.R.C.A. B-IOO TO: MEETING 15/79 RE: HISTORICAL SITES DIVISION STAFF PROGRESS REPORT JANUARY 1 TO MARCH 31, 1979 1) PROGRAM (a) Registration and Artifacts During the first three months of 1979, the Registration Department has received 12 donations and has catalogued 92 artifacts. All the benches in the Town Hall have been repaired and repainted. A major reorganization of the collection held in storage is presently under way. This long range project will provide more efficient use of all Village storage areas and improved care of the collection. Some general sorting and rearranging has been started wherever possible and the Mackenzie House basement has been cleared in order to begin preparing this area to house the textile collection. (b) Publicity and Promotion A large display of Victorian memorabilia was loaned to the Garden Club of Toronto for their 1979 Spring Flower Show at the Civic Garden Centre. Several dolls from the Black Creek collection have been included in an exhibition called "Dolls of Many Cultures" at the Royal Ontario Museum. A display of glass objects has been loaned to the Town of Caledon. While the Village was closed to the public, it was rented by several commercial photography groups. Olin Films used Burwick House and . several exterior locations in the Village as, the set for a children's Christmas film. Scollard Productions produced a Charge x commercial at Laskay Emporium, C.B.C. filmed some material for a documentary on Arthur Miller, and background for a news story on education. Henry Less and Associates used Second House kitchen as the set for an introduction to a Wide World of Sports Program. T.V. Ontario filmed some background material at Dickson's Hill School for a documentary on French schools in Ontario. Village staff have been interviewed on two C.F.T.O.-T.V. productions of Kid's Korner and have taken part in three of John Bradshaw's shows on C.F.R.B. Village staff have given talks and lectures to .the following org~nizations: the Etobicoke Historical Society, the Society for the Preservation of Historical Thornhill, the North York Senior Citizens Group and the Happy Club Senior Citizens Group of the Kingsway Baptist Church. The first joint meeting of the staffs of all Metro Museums was held in February and many village staff attended. Mrs. Jeanne Hughes from Black Creek was the speaker at this program. (c) Special Events During January, February and March, the Fisherville Church .was used for eight weddings and two special services. In addition,. one service'was held at the Mennonite Meeting House. 'Half Way House catered to seven receptions. On January 20th, Warren Rill Catering Ltd.. arranged with several food suppliers to provide food for a special "Pioneer Day". On this day, prices at Half Way House and the snack bar were drastically reduced to encourage. publicity for the Village. The day'was successful and over 1,500 people attend~d. In honour of the "Year of the Child" a metal. plate has been produced from a picture in Black Creek's collection, to be printed on the Washington Press in the Print Shop. (d) Building Maintenance and Construction While th.e Village buildinas were closed for the season, the regular cleaning and maintenance was carrie out. A new matte finish floor sealer has been applied this year to eliminate the shiny look that the clear urethane has given to pine floors. The two sets of stairs in the Second House have been repaired and re~nforced. The hall wallpaper in Half Way House has been replaced. Carpet was laid in the Registrar's Office. A change table for B-I01 HISTORICAL SITES DIVISION STAFF PROGRESS REPORT JANUARY 1 TO MARCH 31, 1979 Page 2 for babies has been installed in the public washrooms for the convenience of our visitors. (e) Ground Maintenance and Development The wagons used to provide rides for visitors in the Village were fully rebuilt and repainted. On weekdays during the winter, a sleigh-ride service was provided for luncheon guests to Half Way House. The trees ~hout the Village have all been pruned and trimmed. The garbage-barrel parking lot markers have been replaced where necessary for Village opening. (f) Livestock Two lambs arrived in time for Village opening and the rest are expected later this ~ring. (g) Staff Several members of village staff attended an Ontario Museum Association Symposium on 19th Century Gardens, held at the Royal Botanical Gardens in Burlington. Staff from Black Creek and Gibson House in North York took a four-day excursion in March, visiting the Ford Museum and Green- field Village in Dearborn, Michigan and Park House, Fort Malden and the Hiram Walker Museum in south-western Ontario. 2) FINANCIAL STATEMENT - January 1 to March 31, 1979 A. Operations & Maintenance - Black Creek Pioneer Village Total axlget Variance Buiget Used Appropriation - , - Experditures $ 191,113 $ 889,000 $ 697,887 21 Revenue $ 54,072 $ 822,000 $ 767,928 6.57 B. Historical Si~es Development Total adget . Variance Buiget Used ~~tion - , Expeim.tures $ 3,230 $ 54,917 $ 51,687 5 3) FINANCIAL COMMENTS A. Operations & Maintenance Black Creek Pioneer Village The attendance for the winter program in 1979 was somewhat less than for the same time period in 1978. However, with the excellent weather during' the school break, the first two weeks of the regular season had a higher attendance. As of March 31, the 1979 figure was 13,559 (1,500 lower than last year.) Consequently, gate revenue is down slightly, but sales outlets have shown an increase. The citizenship program has shown a considerable increase in 1979 with 218 members as compared to 125 in the first three ,months of 1978. . HISTORICAL SITES DIVISION STAFF PROGRESS REPORT B-l02 JANUARY 1 TO MARCH 31, 1979 Page 3 Through the efforts of Mrs. Eustella Langdon and members of the Southern Ontario Unit of the Herb Society of America, the Garden Club of Toronto and the Dunington Grubb Foundation, the Village will be provided with a student to work with our gardener for the summer. The student will be mainly involved with the Doctor's Garden, the Dye Garden and the Kitchen Garden. B. HISTORICAL SITES DEVELOPMENT Capital develoPment will be limited to three major restorations this year -- the Taylor Cooperage, the Richmond Hill Manse and ~he Sawyer's Home. Funds have been made available through the Metropolitan' Toronto and Region Conservation Foundation, Wintario, and the Junior League of Toronto to complete the restoration of the Cooperage and the Sawyer's Home. It is hoped that funds will be available in 1980 to complete the Richmond Hill Manse. B-l03 Conservation Land Management Division Progress Report January - March, 1979. Conservation Services: Private Land Assistance Programmes This Spring, approximately 108,000 reforestation trees will be planted on private lands. This represents an increase of approximately sixty' thousan~ trees over last year's private reforestation assistance programme. The farm tree and shrub programme will see approximately 5,342 farm trees and 8,673 shrubs planted. Six stream improvement projects have been scheduled for this Summer. A stream assessment programme will be carried out on cold water streams in the headwaters (Humber River and Duffin's Creek) to assist in developing a suit~ able management plan. Five conservation plans have been completed this year. The Authority tree spade is scheduled for seven private rentals. Promotion of service programmes has resulted in the brochure and fact sheet on urban wildlife enhancement and grassed waterwaYs. A Conservation Services Field Day has been scheduled for Sunday June 3rd, 1979. Four site visits have been carried out for pond services. Authority Land ,Programmes Reforestation trees will be planted:- Glen Haffy 10,900. Cold Creek 7,700; Gibson Lake 10,200; Lake St. George 2,500; Clairevi1le Conservation Area 6, 300; Bolton Reservoir 1,500~ Heart Lake 2,300; and Boyd Conservation Area 1,200. Woodlot management programmes have been under way at Claireville, Boyd, and Bruce'S Mill Conservation Areas and at Gibson Lake. Approximately 155 cubic metres of fire wood have produced, as well as 5,494 cub. bd. ft. worth of sawlogs. Ten cords of pulpwood wree produced at Gibson Lake. Stream improvement projects will be carried out at Albion Hills Conservation Area this Summer. Boy Scout groups from York Region and Ajax will be planting trees at Claire- ville Conservation Area - 20,000, and 10,000 at Glen Haffy Conservation Area. Special Projects A tree maintenance programme will be undertaken at the Humber Bay East Water- front project. P1antings are anticipated to begin this year at the Thackeray Landfi 11 Si te . A landscape project will be carried out at the Kortright Centre for Conservation. A number of Peel, York, and Durham erosion control projects will be carried out by the Conservation Services. Section in conjunct- ion with the Water Resource Division, Flood Control Section. Conservation Areas: Development No development has taken place to date as budget approval has jot yet been received from the Ministry of Natural Resources. Operations During the Winter, eight Conservation Areas were open for winter activities. Most staff time was involved with routine operations. The ski programme at Albion Hills operated at capactiy. The Bruce's Mill programme ran below capacity. As this part of the programme becomes better k~own, this situation will improve. The improved ski trails at Palgrave, Cold Creek, and Claremont were well used. This past ski season was shorter than previous years due to lack of snow in early January. The Bruce's Mill maple syrup demonstration was improved with the addition to the sugar shack, an Indiam method exhibit, and a self-guiding'trail booklet. Attendance and product sales have incrased during the first pa~t of the programme. A promotional brochure and flyeD;have been completed for the Claireville canoe programme. Response has been very encouraging with several group book- ings already confirmed. Preparations are now under way for the opening of all Areas for the Spri~g and Summer seasons. To April 1st, 1979, Conservation Area attendance decreased 62,934 or 38.5% over the same period in 1978. This is a result of lack of snow during the early part of the Winter. The following table compares individual Area - 2 - B-l04 attendance in 1978 and 1979: Conservation Area i979 1978 Albion Hills 36,294 64,734 Black Creek 7,408 15,746 Boyd 6,698 14,771 Bruce's Mill 26,918 28,369 Claireville 3,163 5,042 Claremont 1,852 5,092 Cold Creek 6,192 9,488. Glen Haffy - - Greenwood 1,696 7,250 Heart Lake 4,297 13,131 Palgrave 5 , 898 - Petticoat Creek - - Woodbridge - - TOTAL 100, 416 163,623 Financial Statement - January - March, 1979 I Yr. to Date TOtal , ~udget Forecast To Expend. Commit Approp. Budget Used Dec. 31/79 . Cons. Areas Develop. 36,523. - '36,523. 270,000. 13 270,000. Cons. Areas Operate 279,016 10,159. 289,175. 1,370,800. 21 1,370,800. Rent & utility Servo 10,278. - 10,278. 39,000. 26 39,'000. Private Land J Programme 18,603. 1,751. 20,,354. 113,000. 18 113,000. Authori ty Land Programme 18,950. - 18,950. 95,000. 20 95,000. Cons. Areas Revenue 115,111. - 115,111. 710,000. 16 710,000. Private Land Revenue 180. - 180. 15,000. 1 15,000. Financial Comments: - COnservation Services To date, approximately 20' of the budget for Conservation Services has been spent. Revenue for private' land programmes will be met as many p~~grammes are now under way. COnservation Areas The only expenditures to date have been for support staff. As soon as budget approval is received, work will commence. on Development items. Conservation Areas ,Operations expenditures during this period are as antic- . ipated. Revenues are slightly down from previous years due to lack of snow at the beginning of the Winter season. Both spending and revenues will be within budget estimates. t lQ7CL 04.19. B-l05 TO: The Chairman and Members of the Executive Committee, M.T.R.C.A. - Meeting 15./79 RE: INFORMATION & EDUCATION DIVISION PROGRESS REPORT - January 1 - March 31, 1979 (a) INFORMATION The Community and Staff Relations Program has continued to place renewed emphasis on the resource management activities of the Authority that are identified with the Conservation and Recreation Land Management Plan and the Water and Related Land Management Plan. Considerable time has also been spent on an Information Program to promote the fund-raising activities of The Metropolitan Toronto and Region Conservation Foundation. ' Highlights Included: - the production of 230,000 pieces of literature including: - 200,000 copies of the four-colour general brochure, - 10,000 copies of the 1979 Calendar of Events and Activities; - 2,000 copies of the 1977-78 Biennial Report, - 1,000 copies of the Meeting Facilities Brochure for the Kortright Centre for Conservation, - 500 copies of the 1979 Directory; - 5,000 copies of the four-colour brochure for The Metropolitan Toronto and Region Conservation Foundation; - 225 copies of the sixty-six-page catalogue for Foundation fund-raising; - 10,000 stick-on name tags. - the completion of three special printing projects (20,200) for Albion Hills Conservation Field Centre, the Kortright Centre for Conservation and the Soil Conservation Society of America - the agreement to participate in the "superguide" with the Convention & Tourist Bureau of Metropolitan Toronto was approved - the Bureau is printing 300,000 copies of the "Superguide" and an overrun of 300,000 copies of the Attractions of Metropolitan TOronto - the production of twenty-five news releases for the media and School Boards (total distributed - 21,300) - samples of 250 press clippings, on all aspects of.the Authority's. activities, have been received _ forty-three colour television promos (one-minute), on the Spring related activities of the Authority, have been distributed and are in use - one Authority exhibit was set-up and on display for Canada Heritage Week in the Scarborough Town Centre - the production and distribution of 750 copies of "Highlights", the Authority's external newsletter - five special photo assignments have been completed during this periOd - there are now new postage meter. identification stamps, relating to Authority activities (eg. Alert Your Children of the Dangers of Spring Flooding) - three new one-minute colour public service films are now in progress - one for the Kortright Centre for Conservation - one for Flood Control and Water Conservation - one for The Metropolitan Toronto and Region Conservation Foundation. Page 2 8-106 TO: Chairman and Members of the Executive committee, M.T.R.C.A.. - Meeting 15/79 RE: INFO~mTION AND EDUCATION DIVISION PROGRESS REPORT - January 1 - March 31, 1979 (b) EDUCATION (i) Residential Field Centres: - booked beyond 90% occupancy. - usual range of elementary and secondary level students. - such additional groups as girl guides, church groups, a leadership training group, the Society of Environ- mental Biologists, a Ministry of Natural Resources Workshop. - the finalizing of summer programs that include the Archaeology credit course for senior secondary students at Boyd, the March of Dimes summer camp at Claremont and the York University course in Conservation and Environmental Education (Geogr~phy 255) at Albion. - the continuation of the,Practice Teaching Program for Faculty of Education students from both the University of Toronto and Althouse College at the University of Western Ontario. (ii) Lake St. George Conservation Field Centre: - the students from the various Metropolitan Toronto School Boards are actively engaged in partitioning, dry-walling, plumbing, wiring, painting, sheet metal and heati~g installation. - the Metropolitan Separate School Board are buildinq the beds and the York County Board of Education have agreed to assist with the clean up and landscaping. (iii) Kortright Centre for Conservation - the official opening scheduled for mid June of this year. .- the workshop now fully operating and an Exhibit Preparator hired on a six-month contract. - the recommendation from the Theme Committees for the design and program components related to both the Forestry and the Fish and Wildlife themes was approved. - the approval of a Wintario grant for' 50% of the total project cost of $233,319. - the establishing of a Fund Raising Committee by the Foundation, to raise $150,000. - the development of the outside area to include: (a) a sawmill 'to be operating by May 1, 1979; (b) the filling and landscaping of the wildlife pond; (c) the planting of trees and shrubs and the continued extension of trail develo~nt, (d) the development of the first phase of the patio; (e) the development of the first phase of the entrance. (iv) Black Creek Pioneer Village - Education Tour and Pioneer Life Programs. \ I - the continued high interest in tpe programs on the part of teachers and students. - the continuation of the Practice Teaching Program for the Faculty of Education students from the University of Toronto. - the involvement of teacher groups in the programs as part of their professional development. I ; ...3... B-!U7 Page 3 TO: Chairman and Members of the Executive Committee M.T.R.C.A. - Meeting #5/79 RE: INFO~~TION AND EDUCATION DIVISION PROGRESS REPORT January 1 - March 31, 1979 (v) Special Programs _ the Maple Syrup .programs at Kortright and Bruce's Mill were again very successful - almost 100% booked. 2) FINANCIAL SUMMARY A. Operations and Maintenance - Community Relations Information and Education Operations. Expenditures Expenditures Expenditures 1979 Budget To-Date % of Budget $859,000 $143,875 17% Revenue Revenue Revenue 19 79 Budget To-Date % of Budget $757,700 $143,266 19% B. Water and Related Land Management - Cor.~unity Relations Program (WlO) 1979 Expenditur~s Expenditures Budget To-Date % of Budget $471,194 $100,168 21% (project elements) $239,000 51,933 21% (non-project elements) C. Conservation and Recreation Land Management - Conservation Area Information and Interpretive Program (C3) 1979 Expenditures Expenditures Budget TO-Date % of Budget $21,000 $5,461 26% FINANCIAL COMMENTS (a) Operations and Maintenance - Community Relations Expenditures and revenue are in line with budget estimates. (b) Water and Related Land Management - Community Relations Program (WlO) , . Expenditures are in line with budget estimates, except Lake St. George, where costs wil~ be approximatel~ $15,000 over budget. .This amount will be included in Phase 2 of the Lake St. George development. Funding for this second phase is available in the 1979 budge~s of the participating school boards~ (c) Conservation Area Information and Interpretive Program (C3) Expenditures are in line with bu~get estimates. T',E. Barber"Administr~tor, Information and Education Division. B-I08 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE M.T.R.C.A. - Mtg. '5/79 FROM: Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 FLOOD CONTROL SECTION 1) MAINTENANCE WATER CONTROL STRUCTURES (a) PROGRESS Normal day to day maintenance was carried out on all the water control ,structures. The inspection of all the structures after the spring runoff has been completed~ The major'maintenance contemplated for this 'year ,has received Provincial approval and consists of a study of 'the Lower Humber weirs and fencing of the Brampton Diversion Channel. (b) FINANCIAL STATEMENT TO MARCH 31, 1979 Ye'ar , of . Forecast To Date" Total Budget; to Expend. Comm,i.tments Approp. Budget '" Used Dee ,/31/79 " $ $ $ $ ~-, $ Mainte- 28,022.10 928 28,950.10 18~,000.00 15 184 nance (c) FINANCIAL COMMENT The small expend1ture for these first three months is due to the winter conditions making maintenance work on some structures impossible. However, it is expected to,expend the total budget this year. 2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS (e) PROGRESS Flood Warning and Forecasting System This will be the last year of the three-year ptogr~ for the acquisition of radio communication equipment and Provincial approval has been received for this year!s equipment. The acquisition of recording rain gauges is being studied as well for this'year. (b) FINANCIAL STATEMENT TO MARCH 31, 1979 Year' , of Forecast To Date Total Budget to Exp~nd. C9mmitments Approp. Budget Used Dee /31/79 $ $ . $ $ , $ Telemark Gauges 126.38 0 126.38 8,000.00, 1 7,873.62 Radio 11.53 0 11.53 . '15.,000.00 0 14,988.47 System Staff 17,754.89 0 17,754.89 65,800.00. 26 48,045.11 Salaries Staff 260.77 0 260. 7.7 . 3,700.00 7 3,439.23 Travel 18,153.57 O. 18,153.57 92,500.00 19 74,346.43 B-l09 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE M.T.R.C.A. - Mtg.#5/79 FROM: Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 2 2) (c) FINANCIAL COMMENT It is ~~pected to expend this budget this year. " 3) INTERIM PROJECT CAPITAL , (a) PROGRESS The Flood Plain Acquisition continued during this. period again with concentration being made on properties within the Village of Stouffville required for the proposed channel improvements. The Headwater Acquisition Programme has seen the acquisition of all major properties during this period. j. Environmental Monitoring Programme has seen a receipt of the 1978 report and it is expected that the 1979 programme will commence in the later spring. The Flood Control Plan Review has continued seeing a completion, of the mapping programme and the Hydrologic Modelling study. The Floodline Plotting studies are also virtually completed which has enabled cqmmencement of the damage centre analyses and flood control alternatives study. (b) FINANCIAL STATEMENT TO MARCH 31, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget U~ed Dee /31/79 Flood Plain Acquisition 364,743.03 482,715.00 847,458.03 642,273.00 U1 642,273.00. Headwater Acquisition 143,450.59 0 143,450.59 200,000.00 71 200,000.00 Environmen- tal Monitoring 1,780.62 0 1,780.62 100,000.00 1 100,000.00 Flood Control Plan Review 38,043.45 25,700.00 38,043.45 397,000.00 9 397,000.00 567,317.12 508,415.00 1,075,732.l~ 1~339,273.00 80.1,339,273.00 , (c) FINANCIAL COMMENT It appears at this time, that the acquisition budget is over- expended however, due to some flexibility in closing dates, some of the commitments can be held over until 1980. , 8-110 i ( TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE M.T.R.C.A. - Mtg. #5/79 FROM: Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 3 4) INTERIM PROJECT CAPITAL -(BENEFITING MUNICIPALITY) (a) PROGRESS W.C.-58 - Don River ... Bathurst Street to Finch Avenue The additional funds required as final payment.have been approved and will be paid this year. Erosion Control and Slope Stabilization in Metro ITEM . LOCATION WATERSHED STATUS Itajor Remedial Work 6-14 Sulkara Court Don River In progress 50-58 Stanwood Crescent Humber River In progress 19-45 Riverview Hts. Humber River In progress lMinor Remedial Work Beechgrove Road Highland ~reek In progress . - Phase II Erosion Control and Slope Stabilization In Peel,' York and Durham Remedial Work is in progress at 14th Avenue (Lots 5 , 6, Concession .S), in the Rouge River Watershed. Reconstruction of Highland Creek 1979 was the third year of the three-year programme for remedial work within the Highland Creek. Work has been completed at the fOllowing sites. It is expected that all of the sites damaged by the storms i~ 1976 and 1977 will be repaired as contemplated under this project by the end of 1979. ' LOCATION STATUS Morningside Parks Yard Completed Scarboro College T~nnis Courts Completed South of Kingston Road Br~dge . Completed B-lll TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE M.T.R.C.A. - Mtg. i5/79 FROM: Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 4 4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS (Cont'd) Engineering Studies: Stouffville Channel Detailed engineering is being ~ompletep for the channel works and it is expected to start construct10n early this summer. Wilket Creek Engineering Study This study is expected to commence later this year once the completed Hydrologic Model study and floodline study, have been received. Oak Ridges Study Draft report of this study has been received and it is expected to finalize it early this summer. (b) FINANCIAL STATEMENT TO MARCH 31, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec /31/79 ~ ~ $ $ , $ W.C.-58 0 0 0 99,690.00 ' 0 99,690.00 Erosion Control Metro 58,629.03 19,491.00 78,120.03 825,000.00 9 825,000.00 Erosion Control Peel, York 3,929.81 0 3,929.81 200,000.00 2' 200,000.00 " Durham Highland Creek 115,573.20 548.00 116,121.20 240,000.00 48 240,000.00 Resto'ra- tion Stouffville Channel 4,684.60 0 ",684.60' 395,000.00 1 390,315.40 Wilket 0 0 0 10,000.00 0 10,000.00 Creek Oak Ridges 0 0 0 5,000.00 0 5,000.00 182,816.64 20,039.00 202,855.64.l~774,690.00 11 1,770,,005.40 B-1l2 '1'0 I THE CHAIRMAN AND MEMBIi;RS OF THE EXECUTIVE COMMITTEE M.T.R.C.A. - Mtg. '5/79 FROM: Administrator - Water Resource Division RB: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 5 4) ec) FINANCIAL COMMENT Of the $1,027,000.00 budget shown for the Erosion Control component for Metro, Peel, York and Durham, it should be noted that $27,000.00 of the total is the anticipated revenue from the benefiting property owners. 1979.04.19 JCM/fn B-113 '1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. -Meeting 115/79 FROM: ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO MARCH 31, 1979 Page 6 WATERFRONT SECTION The Authority received word from the Province early in 1979 that the Supplementary Waterfront Project had not been approved. The funds which were requested in the Supplementaty Project were intended to allow the Authority to proceed with the shoreline management program, some additional development of the Western Beaches and to start the Colonel Samuel Bois Smith waterfront project. As a result of the Province's decision, these projects will again be deferred. The Municipality of Metropolitan Toronto has however, agreed to carry the Municipality's portion of the Supplementary Project in their forecast for 1980-1981- Requests for Provincial contributions to this project will be made again this year for funding in 1980. However, the waterfront project is presently being funded at a level of approximately 2.8 million per year, which will enable the Authority to proceed with the development of Humber Bay and Bluffers Park waterfront areas. In addition, some shoreline management works will be undertaken and the Environmental Monitoring program will be continued. StUdy and design activities related to shoreline management and future water- front projects will also be undertaken. COLONEL SAMUEL BOIS SMITH -The Master Plan for the site has now been approved by the Ministry of Natural Resources and formally submitted to the Ministry of the Environment for approval under the Environmental Assessment Act. It is anticipated that the Ministry of the Environment will advise the Authority in the very near future as to the suitability of the Master Plan'document under the Environmental Assessment Ac~. If the Ministry of the Environment determines that the document addresses all the concerns under the Act, then the Mi~istry will shortly thereafter advise whether or not a public hearing ,will be required. Authority staff anticipate that due to the concern expressed by some local residents, the Ministry will call for a hearing. HUMBER BAY WEST -The landfilling operation was terminated in mid-Februax:y following the completion of the land base as defined in the Master Plan. The total area created as part of Phase II was 43 acres (17.49) , which combined with the lands previously created as part of Phase I, result in the total Humber Bay West project now encompassing 64 acres (25.99) . -The Authority construction activities through 1979 will be confined to the placing of rubble material as a base for the roads .nd parking lots, as well as continuing operations to com~lete the rough grading. . -The major activity at the site in 1979 will be the result of the construction activities of the Humber Bay Boating Federation. The Federation plans to install 460 boat slips this season, and the floating docks required for this project- are presently being pre-fabricated. It is anticipated that the instal'lation of the docks will begin in early May with completion scheduled for sometime in mid-June. HUMBER BAY EAST -The final plans for the pond sy-stem, park buildings" and entrance road and parking lot have been completed and contract specifications are being prepared. It is anticipat~d that tenders' will be called early in May. -The landscaping plans have also been prepared, but funds will not permit this work to be completed in 1979. Final landscaping will be undertake~ tiy the Conservation Land Management Division in the spring of 1980. .. 8-114 TOI THE CHAIRMAN AND MEMDERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. -:Meeting 115/79 FROMI ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT From January 1. 1979 to March 31, 1979 Page 7 WESTERN BEACHES -The detailed Master Plan and proposed program of development are nearing. completion. However, discussion with the City,of Toronto officials is ongoing with respect to the proposed development between the Boulevard Club and the Toronto Sailing a~d Canoe Club, a~ well as condit,ions of the transfer of lands to the Authority. BLUFFERS, PHASE II -The landfilling operation during the winter months was confined to the protected area to'be occupied by th6 Bluffers Boating Federation. -Although fill volumes were low through January and February, the volumes increased rapidly following the completion and closing of the Humber Bay West project. Subsequently, an area in excess of 2 acres has been created during' March and April. The total landfill area associated with Blutfers Phase II is now approximately 39 acres (15. 8H) . -The landfilling operation was again shifted to the outer breakwater as of April 16th, and it is anticipated that most of the westerly arm of the break- water will be completed this year. -Predictions of fill volumes are substantially lower than in previous years, but it is hoped that once the weather improves and construction activities increase, a better prediction of fill volumes can b~ made. -Federal funding of the project under the Small Craft Harbours Assis~ance Program has been extended to allow for contributions to the final armouring of Points 8 and 9. To date, the Federal government has agreed to allocate $250,000 to the project, which should be sufficient to purchase all the' necessary armouring materials and tQ transport some of the large armour-stone to the site to be stockpiled. The remaining stone is being stockpiled in the quarries to be transported and placed at a later date, ,either by ~he Federal 90vernment if funds allb~ or by the Authority. -The plans of the Bluffers Boating Federation call for the construction of 120 boat slips in the 1979 season. Materials are presently being stockpiled on the site and it is anticipated that pile driving will begin in the very near future. -One of the major components of the Authority'~ involvement' in the project at Bluffers in 1979 is the construction of two double launching ramps and associated day mooring facilities. The contract for this p,roject was recently awarded to Disher-Farrand Co. Limited with completion schedul.ed' for June 15th. EAST POINT -Discussions. are ongoing with the Authority's 'consultant. Hough 'Stansbury and Associates in an effort t~ .finali~e the Master Plan review and to prepare site plans in preparation for the construction to begin. at 'this site upon completion of Bluffers Park. ENVIRONMENTAL MONITORING -The final report for the 1978 program has been received and presented to the Waterfront Advisory Board. The outline for the 1979 program has also been prepared and approved. The collection o~ field data will begin on April 18th. B-1l5 '1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. -Meetinq 15/79 FROM: ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT Prom January 1, 1979 to March 31, 1979 Paqe 8 SHORELINE MANAGEMENT -Preparation of a detailed Master Plan in the Scarborouqh sector is onqoinq. A proposal form a soil consultinq firm has recently. been received, which covers the detailed analysis of slope stability of the Scarborouq Bluffs, aimed at producinq recommendations on appropriate construction techniques to stabiliz, the,Bluff face after the toe of the Bluffs bas been protected. -If sufficient volume of surplus fill material is available ~t Bluffers Park, the material will be used to construct a test section of the artificial beach system'which appears to have particular advantaqes in stabilizinq the toe of the Bluffs. -The contrac~ drawinqs for protective work along the Eastern Beaches in the City of Toronto have been completed. Unfortunately, the decision by the Province not to approve the Supplementary Proje~t has resulted 1n insufficient fundinq to undertake these works in 1979. FINANCIAL STATEMENT TO MARCH 31, 1979 Year to Date Commitments Total Approp. Budqet . of Budqet Used Expenditures '. Colonel Samuel Bois 3,029.77 - 3,029.77 50,000. 6 Smith Park Humber Bay West 70,244"61 - 70,244.61 160,000. 43 Humber Bay East 853.81 - 853.81 950,000. 0 Western Beaches - - - 5,000. 0 Ashbridqe's Bay 1,219.61 - 1,219.61 5,000. 24 .. Bluffer~ Park 45,295.15 - 45,295.15 740,000. 6 East Point 4,012.31 - 4,012.31 20,000. 20 Petticoat Creek - - - 20,000. 0 Studies/Monitorinq 15,6.51.29 1,867.00 17,518.29 110,000. 15 Shoreline Manaqement '6,999.20 - 6,999.20 ,500,000 1 Land Acquisition 309.937.84 - 309,937.84 240,000 129 PROGRAM TOor:A.L 457,243.59 l,867.0Q ,,459,110,.59 2 ;800 , 000. 16 The Waterfront Development Budqet is qenerally on~tarqet, recoqnizinq that most of the construction activity vi11 not beqin until early May. The over expenditure in the land acquisition budqet is a result of the Sunny Point expropriation settlement. This over expenditure vi11 be dealt with in a future budqet amendment vhich vi11 also address the extent of the Authority's involvement in ,the final armourinq of Bluffers Park. If the Federal qovernment is unable to undertake the final armourinq, funds vi11 h~ve to be re-allocated in the Authority budqet, vhich may result in redu~tions in the shoreline manaqement proqram and/or the development proqram at Humber Bay East. tD I ... .... v c... B-117 , the metropolitan toronto and region conservation authority minutes Report .6/79 EXECUTIVE COMMITTEE WEDNESDAY-MAY-16-1979 .6/79 The Executive Committee met in the Board Room, Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, May 16, 1979, commencing at 10:~O a.m. PRESENT WERE Chairman R. Grant Henderson Vice Chairmap Mrs. F. 0811 Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. 'r.H.. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning , policy W.A. McLean Adm. - Historical Sites Division R.K. Co~per Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Executive Secretary Mrs. K. Conron S'visor, Printing, Mailing' Office Supply Servo L. Cowie Research Planner, Planning & Policy Mrs. A.C. Deans Development Co-ordinator, Planning , Policy J . W. Malet1ch Engineer-Reg. Control, Flood Control Section, WRD R. Saadia Project Eng.-Dev't.,Flood Control Section, WRD A. G. Sahabandu B. HARPER BULL CONSERVATION FELLOWSHIP AWARDS -- 1979 Mr. Henderson advised that three scholarships have been awarded for 1979: Miss M.E. Doran, University of Waterloo Major Course of Study: Geography - Environmental Studies Miss E.M. Saagh, University of ~ronto Major Course of Study: Forest Management ('rhe Misses Doran and Saagh were unable to be present and their awards will be forwarded to them) Miss Renata M. Moras, Seneca College Major Course of Study: Recreation Facility Management Mr. Card stated that it had been decided to increase the number of scholarships from two to.three since the calibre of applicants is high and the selection of successful candidates is difficult. . . Mrs. Bull presented a cheque to Miss Moras and congratulated her on her success. Miss Moras expressed her appreciation of the award to Mrs. Bull, the Foundation and the Authority. MINUTES 'rhe Minutes of Meeting 15/79 were pres~nted. Res. 1138 Moved by: C.F. Kline Seconded by: Mrs. F. Gell B-1l8 -2- RESOLVED THAT: The Minutes of Meeting #5/79, as presented, be adopted as if read: . '. , " CARRIED; SECTION I '~'~:, '. . THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: 1. ONTARIO REGULATION 845/77 AS AMEND~D: .CONS,ERVATION AREAS - METROPOLITAN TORONTO AND REGION -&- ONTARIO REGULATION 735/13 AS AMENDED: FILL, CONSTRUCTION AND ALTERATION TO WATERWAYS -Appointment of Enforcement Officers A staff communication was presented advising that the Authority is in receipt of amendments to the subject regulations, as follows: -The Authority may appoint, from time to time, officers to enforce this Regulation". Res. 1139 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The communication having regard to proposed amendments to Ontario Regulations 845/77 As Amended and 735/73 As Amended, be received; and ~E EXECUTIVE COMMITTEE RECOMMENDS THAT: The persons named below be appointed officers to enforce regulations made under The Conservation Authorities Act: (a) Ontario Regulation 845/77 AS Amended: Conservation Areas - Metropolitan Toronto and Region: (b) Ontario Regulation 735/73 As Amended: Fill, Construction and Alteration to Waterways: Kenneth G. Higgs John McCaffrey William A. McLean Dennis MacKay John W. Maletich David Williams CARRIED; 2. ONTARIO REGULATION 845/77 AS AMENDED: CONSERVATION AREAS - METROPOLITAN TORONTO AND REGION -Appointment of Enforcement Officers A staff communication was presented 'advising that the Authority is in receipt of amendments to the subject regulation, as follows: -The Authority may appoint, from time to time, officers to enforce this Regulation." Res. 1140 Moved by: Mrs. J .A. Gardner Seconded by: C.F. Kline RESOLVED THAT: The communication having regard to proposed amendments to ontario Regulation 845/77 As Amended~ be received: and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following persons be appointed officers to enforce Ontario Regulation 845/77 As Amended, made under The Conservation Authorities Act: ! Conservation Land Management Division Paul B. Flood Administrator James D. Agnew Superintendent of Operations Simon Bontje Regional Superintendent Lawrence Maltby Regional Superintendent William R. Robinson Safety Officer Case P. Bontje Superintendent Norman Taylor Assistant Superintendent Rogert F. Baxter Lead yand Jy n G. Sr~achan su~~r ntendent G en Caus l.n As l.stant Superintendent Murray MacDowell Superintendent Herbert A. McIntosh Lead 'Hand Gordon Kidd Assistant Superintendent Daniel Whelan Lead Hand John K. Britton Superintendent Jack Lamers Assistant Superintendent Jake Honingh Assistant Superintendent '-3- B-119 Stephen Bain Superintendent Frank Mellow Assistant Superintendent Russell McMullin Superintendent Robert Downey Assistant Superintendent Henry Burke Superintendent George F. Rogers Superintendent Michael Carter Assistant Superintendent Historical Sites Division Rino ROncadin Gift Shop Manager Norman Elliott Superintendent of Operations James H. Lyons Asst. Superintendent of Operations w. Alex Jackson Administrative Supervisor Information & Education Division Neil Shaw Superintendent Fred Green Lead Hand Allan Foster Curator -and THAT the staff be directed to investigate the possible appointment as,Enforce- ment Officers, of part-time staff members at ~e Indian Line and Albion Hills Campgrounds. CARRIED, 3. MILEAGE RATES: AUTHORITY MEMBERS A staff communication was presented advising that since mileage rat~s pay- able to Authority members were adjusted in 1976, operating costs have increased substantially, and an increase (from the existing rate of 12. 4C/km.) is recommended. Res. flU Moved by: Mrs. J .A. Gardner Seconded by: M.W.H. Biggar RESOLVED THAT: The staff communication having regard to the proposed increase in mileage rates payable to Authority Members be received, and 'l'HE EXECUTIVE COMMITTEE RECOMMENDS THAT: Subject to the approval of the Ontario Municipal Board, the mileage rates payable to Authority Members be increased to l3-3/4C per kilometer, effective July l, 1979. CARRIED, 4. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l -Budget Revision A staff communication was presented advising that $75,OOO.OO,of the Authority's 1979 expenditures for flood plain mapping are eligible for supplementary funding due to funds received by the Province of Ontario under the Federal/Provincial Flood Damage Reduction Programme. The budget amendment reallocates the funds to Land Acquis~tion and to the Milne workshop, which is being re-provisioned as a result of a fire last year. Res. U42 Moved by: E.H. Card Seconded by: J.S. Scott RESOLVED THAT: The'Budget Revision for the Interim Water and Related Land Management Project - Capita~ - All Benefiting, be received and appended as Schedule "A" of these Minutes; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The Budget Revision for the Interim Water and Related Land Management Project - Capital, - All Benefiting be included in the 1979 Budget Estimates of the Aut~~ri,ty. CARRIED, B-l20 -4- SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY ~IE EXECUTIVE COMMITTEE: 5. FUNCTIONAL AND WATERSHED ADVISORY BOARD MEETINGS -Registration of Members At Meeting #5/79, held April 25, 1979, the following Notice of Motion was submitted for consideration of the Executive Committee at this meeting: Motion Moved by: Mrs. F. Ge11 Seconded by: J.S. Scott THAT the registration of Committee members attending functional and watershed advisory board meetings be closed 30 minutes after the time called for the meeting. THE MOTION WAS received, discussed, but not voted upon. 6. ANNUAL 'SUGARING OFF' FUNCTION At Meeting 15/79, held April 25, 1979, the following Notice of Motion was submitted for consideration of the Executive Committee at this meeting: Res. 1143 Moved by: Mrs. F. Gell Seconded by: M.W.H. Biggar RESOLVED THAT: , The Annual "Sugaring Off" function.. sponsored by the Authority, ~ot be held in 1980: and THAT the staff take under consideration some other type of functio~ and report,back to the Executive Committee. CARRIED, 7. 1979 CONSERVATION AUTHORITIES' TOUR, LAKE ERIE REGION: -September 30-0ctober 3, 1979 A communication was presented advising that the Authority has been allocated 8 tickets for the 1979 Conservation Authorities' TOur to the Lake Erie ~egion, September 30-0ctober 3, 1979.' Res. fl44 Moved by: E.H. Card Seconded by: J.S. Scott , RESOLVED THAT: The Authority participate in the 1979 Conservation Authorities'TOur of the Lake Erie Region, september 30-0ctober 3, 1979, and THAT subject to availability of allocation, the following persons be authorized to attend: R. Grant Henderson Mrs. J.A. Gardner C.F. Kline Mrs. S. Martin E.V. Kolb W.A. McLean J.S. Scott M.W.H. Biggar M.R. Garrett AND FURTHER THAT their expenses, in the amount of $195.00 per delegate, be paid. CARRIED; 8. COMMEMORATIVE FOREST - LESKARD The Chairman advised that a communication has'been received from The Nature Conservancy of Canada requesting support for the acquisition of a twenty-acre tract of heavily forested land at Leskard as a commemorative woodland. -5- B-l21 Res. 1145 Moved by: C.F. Kline Seconded by: J.S. Scott RESOLVED THAT: The Metropolitan Toronto and Region conserVa~ion Authority donate $500.00 to The Nature Conservancy of Canada in support of the ' acquisition of a twenty-acre tract of land at Leskard, Ontario, on the headwaters of the Wilmot Creek, to serve as a Commemorative Forest in memory of A.H. Richardson, A.S.L. Barnes and J.D. Thomas. CARRIED' 9. REPORT 11/79 - CONSERVATION LAND MANAGEMENT ADVISORY BOARD " Report 11/79 of the Conservation Land Management Advisory ,Board was presented. ' , Res. 1146 Moved b~: E.V. Kolb Seconde by: M.J. Breen ~~p ~AT: Report 11/19 of the Ca1serVation Land ~qement Mvisary Beard be THAT the Interim Conservation and Reereation' Land Manaoement Plan be circulated to all municipalities within the jurisdiction of the Authori ty and to the Province of Ontario for comment J and 'l'HAT the municipalities be advised that staff of The Metropolitan TOronto and Region Conservation Authority will be pleased to present the Plan to councils or appropriate committees on dates convenient to them. CARRIED, 10. QUOTATION 179-13 Beart Lake Conservation Area -Chain Link Fencing A staff communication was presented advising that the following quotations have been received for approximately 950 lineal feet of 6' high chain link fencing, including all posts, braces and rails, to match existing fence along the western boundary of the Heart Lake Conservation Area:' F. Powell & Company Ltd. $5,124.16 Roma Fence 5,452.00 Frost Fence 5,633.50 Butt Fence Limited 5,670.00 Res. U47 Moved by: M.W.H. Biggar; Seconded by: E.H. Card RESOLVED ~AT: The quotation received from 'F. Powell , Company Limited for approximately 950 lineal feet of 6' chain link fence, including top rail, braces, line and terminal posts, all fittings and installation, in the sum of $5,124.16, for the Heart Lake Conservation Area, be accepted, it being the lowest quotation received. CARRIED, 11. QUOTATION '79-22 Lake St. George Forest & Wildlife Area -Waterline Pipe A staff communication was presented advising that the following quotations have been received for the supply of ~abour and equipment for the installation of approximately 3,200 lineal feet of 38 dia. P.V.C.'water- line pipe for the above-noted Area: Jack Gilbert & Sons @ 70C per line ft. .-$2,240.00 Harry Smith & Sons @ $3.60 per lin.ft.=$ll,520.00 Sid Balik Plumbing - No quotation received Res. '148 Moved by: E.V. Kolb Seconded by: C. F. Kline RESOLVED THAT: The quotation received from Jack Gilbert & Sons for the supply of labour and equipment required to install approximately 3,200 lineal feet of 3ft dia. P.V.C. pipe for the Lake St. George Forest and Wildlife Area waterline, in the sum of $2,240.00 (70C/ft.) be accepted, it being the lowest quotation received. CARRIED, B-122 -6- 12. QUOTATION #79-20 Kortright Centre for Conservation -Realignment and Construction of Roadway A staff communication was presented advising that the following quotations have been received for the 'realignment and construction of an existing roadway at the Kortright Centre for Conservation: . King City Paving Company $14.00 per sq. yd. Fermar Paving Limited $19 . 00 . . - Res. 1149 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received from King City paving Company for the realignment and construction of an existing roadway at the Kortright Centre for Conservation, in the sum of $l4.00 per square yard, be acce~ted~ it 'being the lowest quotation received. ('1btal cost for project is $2,4 0.00). , CARRIED; 13,. QUOTATION .79-2l Kortright Centre for Conservation -Paving Stone A staff communication was presented advising that the following quotations have been received for the laying of paving stone at the Kortright Centre for Conservation: Algonquin Environments $1.43 per sq. ft. Leslie L. Solty & Sons Ltd. $1.05 . . - Res. 1150 Moved by: E.H. Card Seconded by: Dr. T.R. Leith RESOLVED THAT: The quotation received from Leslie L. Solty & Sons Limited for the laying of paving stone at the Kortright Centre for Conservation, in the sum of $l.05 per square foot, be accepted: it being the lowest quotation received. (TOtal cost for project is $1,70~.00). CARRIED; 14. CONSERVATION AND RECREATION LAND MANAGEMENT 1979 VISITOR SURVEY A staff communication was presented advising that the Conservation Land Management Division staff is currently carrying out a four-season visitor survey in the Conservation and Forest & Wildlife Areas. The funding for the study was included in the 1979 Conservation and Recreation Land Management Development Budget. Res. 1151 Moved by: J.S. Scott Seconded by:, C.F. Kline RESOLVED THAT: Dr. Reiner Jackson of Jackson & Associates be retained, at a per diem of $250.00 for a period up to and including 15 days, to assist staff in the analysis, cross-tabulation and interpretation of data obtained during the Conservation and Recreation Land Management 1979 v.isitor Survey. CARRIED, 15. PAYMENT FOR PERSONAL VEHICLES A staff communication was presented advising that since the rates payable to staff using their own vehicles for Authority business were adjusted in 1976, operating costs have increased substantially, and an increase (from the existing rate of l2.4~/km. is recommended. Res. 1152 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: Rates payable to staff using their own vehicles for Authority business,be increased to l3-3/4~ per kilometer, effective June 1, 1979. CARRIED; -7- B-l23 16. QUOTATION #79-l(I&E) -Black Creek Pioneer Village Brochure A staff communication was presented advising that the following quotations have been received for the printing of lOO,OOO copies of the Black Creek Pioneer village brochure, as follows: C.F. Haughta1 Limited $3,094.00 Northern Miner Press Limited 3,259.81 Yo%k Litho Limited 3,286.00 Olarters Publishing Co. Limited 3,386.61 SOutham Murray Printing 3,448.00 NoYaprint Limited 3,456.20 )l1l.ticolour Printing Limited 3,609.70 westprint 3,633.00 Noble Scott Q:Jopany Limited 3,650.00 JHF Praiuctions Canada Limited 3,691.00 Yorkville Press Calpany Limited 3,732.16 Lawson Grapucs 3,770.00 Mac:Ki.nron-lO'1c:ur Limited 3,895.44 McLaren, M:>xris & 'lbdd Limited 3,942.00 Dlvis & Henderson Limited 4,110.00 BaRbrick Printing 4,147.36 Hawker Siddeley Graphics 4,167.20 Phipps Reproductials Co. Limited 4,198.68 Efmac Printinq & Grapti.c Services Ltd. 4.332.00 Janes A. Cook-Dlvis Printirq Ltd. 4,432.00 Canadian Offset 0>. Limited 4,648.00 Carswell Printing Calpany 4,650.00 D::indi Printing Services Limited 4,668.37 O:I'II-M Manufacturing' Co. Limited 4,869.30 R.B. Trade Printing Service Ltd. 4.898.46 William !bx Associates 4,965.00 York Printing House Limited 5,055.91 Ocok Printinq Canada Limited 5,093.23 ~t Printers Limited 6,010.00 ASS Publishing Limited 6,414.65 Gaylord Lit:hograpUnq Ltd. '1DmER N:7r cx:H'IBl'E Decal Industries Inc. '1DIlER N:7r CXM?IBl'E Howarth & Sl1li. tit Limited tImBLE '10 0X71E Kinball Systems tImBLE ~ QlD1'E ItXqan Dlvis Printi.D] awu: '10 Q(Dl'E Res. 1153 Moved by: C.F. Kline Seconded by: E.V. Kolb RESOLVED THAT: The contract for the printing and supply of 100,000 copies of the Black Creek Pioneer Village Brochure be awarded to C.F. Haughton Limited at the quoted sum of $3,094.00, including taxes. CARRIED, 17. KORTRIGHT CENTRE FOR CONSERVATION -Secondment of Staff - Wildlife Biologists A staff communication was presented advising that the two-year agreement between the Ministry of Natural Resources and The Metropolitan Toronto and Region Conservation Authority, for cost-sharing for two wildlife biologists to develop the Fish and Wildlife Theme at the Kortright Centre for Conservation, expires September 30, 1979. It is proposed that the agree- ment be continued for a two-and-a-half year period, commencing October 1, 1979, on the basis that the Min~stry will provide the entire cost of the, two biologists for the first six months and the entire cost for one biolo- gist for the remaining two years of the agreement. The Authority will be responsible for the provision of office space, travel and other rela~ed expenses, cost of audiovisuals, exhibits and development related to the Fish and Wildlife Theme Program. Res. 1154 Moved by: E.H. Card Seconded by: M.J. Breen RESOLVED THAT: The agreement between The Metropolitan Toronto and Region Conservation Authority and Her Majesty the Queen in Right of OntariO, as represented by the Minister of Natural Resources for the province of anbUiD, to develop a Fish and Wildlife Interpretation and Educational Program atthe Kortright Centre for Conservation, be approved; and THAT appropriate Authority officials be authorized and directed to sign the necessary document to give effect thereto. CARRIED, B-l24 -8- 18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Municipality of Metropolitan Toronto To undertake restoration works to existing storm sewer outfall into' the East Branch of the Don River, just east of its confluence with the Main Branch, between Don Mills Road and the Don Valley Parkway, Borough of East York A staff communication was presented advising that an application has been received from The Municipality of Metropolitan Toronto for permission to undertake restoration works to an existing storm sewer outfall at the above location. Res. #l55 Moved by: Mrs. L.'Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of The Municipality of Metropolitan Toronto for a permit to undertake restoration work to the existing damaged storm sewer outfall into the East Branch of the Don River, just east of its confluence with the Main Branch between Don Mills Road and the Don valley Parkway, Borough of East York (Don River watershed), be approved, subject to: (a) Every effort being made to minimize the silting of the river during construction: (b) All areas disturbed due to construction being restored to the satis- faction of the AuthoritYJ (c) An easement being obtained to enter and do work on Authority-owned lands. CARRIED~ 19. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Family Leisure Centres of Canada Limited To install watermain crossing a tributary of the Don River, just south of Major Mackenzie Drive, west of Keele Street, Town of Vaughan , A staff communication was presented advising that an application has been, received from The Family Leisure Centres of Canada for a permit to install a watermain across a tributary of the Don River at the above location. Res. ,l56 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of The Family Leisure Centres of Canada, be received: and THAT the application of The Family Leisure Centres of Canada for a permit to undertake the installation of a watermain crossing a tributary of the Don River in the area just south of Major Mackenzie Drive, west of Keele Street, Town of vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) All rip rap work being preceded by a filter mat or a 6--12" layer of crushed stoneJ (b) Every effort being made to minimize the silting ,of the creek during construction: (c) The creek configuration being maintained after the crossing is completed: (d) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Town of vaughan. CARRIED; '-9- B-125 20. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Bell Canada To install a buried conduit on Bramalea Road crossing a tributary of the Etobicoke Creek, west of Bramalea Road, north of Derry Road, City of Mississauga A staff communication was presented advising that an application has been received from Bell Canada for permission to install a buried conduit across a tributary of the Etobicoke Creek at the above location. Res. 1157 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff cOllllllunication, together with the application of Bell Canada, be received~ and THAT the application of Bell Canada for a permit to undertake the installation of a buried conduit crossing a tributary of the Etobicoke Creek, in the area west of Bramalea Road, north of Derry Road, City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed, be approved, subject to: Ca) All gabion works being preceded by a filter mat or a '--12- layer of crushed stone~ Cb) All areas disturbed due to construction being restored to the satisfaction of the Authority~' (c) Every effort being made to minimize the silting of the creek during construction: Cd) The creek configuration being restored after construct~on is completed. CARRIED, 21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Consumers' Gas To install a gas pipeline crossing a tributary of the Don River, just south of Steeles Avenue, west of Bathurst Street, City of North York A staff caamunication was presented advising that an application has been received from Consumers' Gas for permission to install a gas pipeline crossing a tributary of the Don River at the above location. Res. 1158 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the,ap~lication of Consumers' Gas, be received~ and THAT the application of Consumers' Gas for a permit tp under~ke the installation of a gas pipeline crossing a tributary of the Don River, in the area just south of Steeles Avenue, west of Bathrust Street, City of North York (Don River watershed), be approved, subject 1:0: (a) The creek configuration being maintained after construction, (b) Every effort being made to minimize the silting of 'the creek during construction~ ' Cc) All areas disturbed due to construction being restored to the satisfaction of the Authority, Cd) An easement being obtained to enter and do work on Authority- owned land. CARRIED~ B-l26 -10- 22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 TOwn of Vaughan To install storm and sanitary sewer crossing the New Westminster Creek, with the storm sewer outfall into the West Branch of the Don ,River, just north of Steeles Avenue between Bathurst and Dufferin Streets, Town of Vaughan A staff communication was presented advising that an application has been received from the Town of Vaughan for a permit to install a sanitary and storm sewer across the New westminster Creek, with the storm sewer out- fall into the West Branch of the Don River at the above location. Res. 1159 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the Town of Vaughan, be received: and THAT, the application of the Town of Vaughan for a permit to undertake the installation of a storm and sanitary sewer crossing the, New Westminster Creek, with the storm sewer outfall into the West Branch of the Don River in the area just north of Steeles Avenue between Bathurst and Dufferin Streets, Town of vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) All gabion works being preceded by a filter mat or a 6"-12" layer of crushed stone. (b) Sanitary manholes Numbers TlA and T8A being equipped with watertight coverSi (c) An easement being obtained to enter and do work on Authority-owned 'lands: (d) All areas disturbed due to construction being restored to the satis- faction of the AuthoritYi (e) Every effort being made to minimize the siltinq of the river during construction. CARRIED; 23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Bramalea Limited TO construct storm sewer outfall discharginq storm water runoff into the Petticoat Creek, east of Rosebank ROad, south of Highway ,#40l, Town of Pickering A staff communication was presented advising that an application has been received for a permit to construct a storm sewer outfall discharging storm water runoff into the Petticoat Creek at the above location. Res. 1160 Moved by: 'Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Bramalea,Limited"be received: and THAT the application of Bramalea Limited for a permit to undertake the construction of a storm sewer outfall discharging storm water runoff into the Petticoat Creek, in the area east of Rosebank Road, south of Highway 1401, Town of Pickering' (The Regional Municipality of Durham) Petticoat Creek watershed, be approved, subject to: (a) A metal gate being placed at the outfall structurei (b) No berm being formed across the flood plain as a result of the storm sewer being installed in that valleYJ (c) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Town of Pickering; -11- B-127 (d) Every effort being made to minimize the silting of the creek during construction: (e) The bank of the valley being pxoperly stabilized and covered after the installation of the sewer line. , , CARRIED, 24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of Housing To undertake restoration works on eroding section of east bank of the West Branch of the Duffin Creek as it flows through Whitevale Golf Course, Town of Pickering A staff communication was presented advising that an application has been received from the Ministry of Housing for a permit to undertake restoration works on an eroding bank of the West Branch of the Duffin Creek at the above location. Res. 1161 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the Ministry of Housing, be received: and THAT the application of the Ministry of Housing for a permit to undertake restoration works on an erOding section of the east bank of the West Branch of the Duffin Creek, as it flows through the Whitevale Golf Course in the area of Lots 30 and 31, Concession 4, Town of Pickering (The Regional Municipality of Durham), Duffin Creek watershed, be approved, subject to: (a) A filter mat or a 6w-12" layer of crushed stone preceding all gabion works: (b) All areas disturbed due to construction being restored to the satisfaction of the Authority, (c) Any areas disturbed due to access to the valley being restored to the satisfaction of the Authority; (d) Bo~h ends of the gabion wall being keyed into the bank: (e) Every effort being made to minimize silting of the creek during Construction. CARRIED, 25. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Proctor & Redfern Limited - on behalf of R.H. McGregor To rehabilitate the side slopes of the Rouge River valley which form part of Proposed Plan of Subdivision 55T-77007, Borough of Scarborough A staff communication was presented advising that an application has been received from Proctor & Redfern Limited, on behalf of R.H. McGregor, to rehabilitate the side slopes of the Rouge River valley at the above location. Res. 1162 Moved by: Mrs. L. Bancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Proctor & Redfern Limited on behalf of R.H. McGregor, be received, and THAT the application of Proctor & Redfern Limited on behalf of R.H. McGregor, for a permit to rehabilitate the side slopes of the Rouge River valley, which form part of the Proposed Plan of Subdivision 55T-77007, Borough of Scarborough (Rouge River watershed), be approved, subject to: (a) All grading being in accordance with the detailed engineering plans and profiles for the R.H. McGregor development, (b) The storm drainage system being completed in accordance with the engineering report, B-l28 -12- (c) Every effort being made to minimize the silting of the river during construction;, (d) All engineering details being approved by the Borough of Scarborough Works Department. CARRIED; 26. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Markland Wood Country Club To place fill on Lot 'G'. Borough of Etobicoke (Etobicoke ,Creek) A staff communication was presented advising that an application has been received from Markland Wood Country Club to place fill at the above location. Res. #163 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Markland Wood Country Club" be received: and THAT the application of Markland Wood Country Club for permission to place fill in an area regulated by the Authority on Lot 'G', Borough of Etobicoke (Etobicoke Creek watershed), be approved, subject to: (a) Only clean fill being used: (b) The applicant complying with his plans, as submitted, which will form part of the permit: (c) The fill being compacted; (d) The fill area being seeded and/or sodded; (e) All work being undertaken and completed to the satisfaction of the Authority. CARRIED; 27. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Samuel Sarick Limited TO construct an addition to existing office building on Block "E", Plan 9l9, City of Mississauga (Mimico Creek Watershed) A staff communication was presented advising that an application has been received for permission to construct an addition to an existing office building at the above location. Res. 1164 Moved by: Mrs,. L: Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Samuel Sarick Limited, be received: and THAT the application of Samuel Sarick Limited for permission to construct an addition to an existing office building in a~ area regulated by the Authority on Block "E", Plan 9l9, City of Mississauga (Mimico Creek water- shed), be approved, subject to: (a) The applicant revising his drawings wherein no openings to the new building shall be lower than the regional elevation of l64.5(metric); (b) A~l existing excavated material being removed from the site: (c) The revised drawings, as recommended, forming part of the permit; (d) Every effort being made to minimize silting of the creek during Construction. CARRIED' -13- 8-129 28. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/13 Borough of Etobicoke To undertake restoration and improvement works at West Deane Park South, west of Martin Grove Road, north of Rathburn Road, Borough of Etobicoke (Mimico Creek Watershed) Application withdrawn at this time. 29. CITY OF NORTH 'YORK -Request for Authority-owned Land: Steeles Avenue Extension Res. 1165 Moved by: E.H. Card Seconded by: Dr. T.H. Leith . RESOLVED THAT: A parcel of Authority-owned land, containing 7.909 acres, more or less, be conveyed to the City of North York for the extension of Steeles Avenue between Kipling and Islington Ayenues. Said land being Part of Lot 25, Concession VII, W.Y.S., City,of North York, des~gnated as Parts 1, 2, 3, 4 and 5, Plan 64R-7584. Consideration to be the nomin~l sum of $2.00, plus all legal, survey and other costs involved in complet- ing the transaction: and THAT said conveyance be subject to an Order-in-COuncil being issued in accordance with Section 20(c) of The Conservation Authorities Act, a.s.O. 1970, Chapter 78, As Amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any docUMents. CARRIED, 30. CITY OF BRAMPTON -Request for Permanent Easement A staff communication was presented advising that a request has been received from the City of Brampton to provide a permanent easement for a storm sewer required south of Church Street, west of Scott Street. The proposed easement affects Authority-owned land known as Part of Lot 4, Plan BR-15, City of Brampton (The Regional Municipality of Peel). Res. 1166 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: A permanent easement be granted to the City of Brampton, required for construction of a storm sewer, south of Church Street, west of Scott Street. Said easement is shown as Part 1, Plan 43R-6645. The Authority-owned land affected is Part of Lot 4, Plan BR-15, City of Brampton, The Regional Municipality of Peel. Said easement to be granted for the nominal consideration of $2.00, subject to the City of Brampton being responsible for carrying out and paying all legal, survey and other costs involved in the transaction: and BE IT FURTHER RESOLVED THAT The appropriate Authority officials be authorized and directed to sign the necessary dOCUMents to give effect thereto. CARRIED, 31. INTERIM WATER,& RELATED LAND MANAGEMENT PROJECT 1979-1981 Flood Plain and valley Land Acquisition Component - Don River Watershed -Property: The Municipality of Metropolitan TOronto Res. 1167 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey RESOLVED THAT: The Report (May 8, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED, B-l30 -14- -Re: Project: Interim Water & Related Land Management project 1979-l98l - Flood Plain and Valley Land Acquisition component - Don River Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.5l, Meeting No.3 - April 21, 1978. Subject Property: Northeast corner,of Sheppard Avenue West and Don River Boulevard OWner: The Municipality of Metropolitan Toronto Area to beAcqui.red: 0.441 acres, more or less Recommended Nominal consideration of $2.00, plus survey and Purchase Price: legal costs -Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being Part of Lot l3, Registered Plan 2069, City of North York, The Municipality of Metropolitan Toronto, located in the north- east corner of Sheppard Avenue West and Don River Boulevard. -Negotiations have been conducted with officials of The Municipality of Metropolitan Toronto and, subject to the approval of your Committee, agree- ment has b~en reached with respect to a purchase price, as follows: The purchase price is to be the nominal consideration of $2.00, plus survey and legal costs, with date of completing the trans- action to be as soon as possible. -I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, leqal costs and disburseme~ts are to be paid. The Authority is to receive a conveyance of the land required ,free from encumbrance. -The Administrator of the Water Resource Division has reviewed this pro- posed acquisition and is in concurrence with my recommendation. -Funds are available. -An application has been made to the Minsiter of Natural Resources for an Inspection Certificate." 32. REPORT #1/79 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD A staff communication was presented advising that the 1979 Watershed Environmental Monitoring Programme was inadvertently omitted as a recommendation of the Flood Control and Water Conservation Advisory Board to Executive Committee Meeting 15, held April 25, 1979. . Res. Il68 Moved by: Mrs. S. Martin Seconded by: M.J. Breen RESOLVED THAT: The 1979 Watershed Environmental Monitoring Programme, involving an estimated expenditure of $80,924.40, be approved~ and THAT ,the firm of Environmental Applications Group be retained as the programme consultant. CARRIED, 33. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Channel Improvements on,the Duffin Creek, Town of Whitchurch-Stouffville: Final Engineering A staff communication was presented advising that detail~d engineering in the preparation of contract drawings and documents has been completed for the above-noted channel improvements. It is expecte4 to commence construction this year and, therefore, approval of detailed engineering is required. Res. *169 Moved by: J.S. Scqtt I Seconded by: Mrs. L. Hancey -15- B-13l RESOLVED THAT: The final engineering drawings and contract documents for Channel Improvements on the Duffin Creek in the Town of Whitchurch- Stouffvllle, under the Interim Water and Related Land Management Project 1979-l98l, be approved. CARRIED, 34. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in The Regional Municipality of Durham Proposed Remedial Work - pine Ridge Road, Town of Pickering (Rouge River Watershed) A staff communication was presented advising that remedial work is proposed at the rear of 1558 pine Ridge Road and vicinity, ~ of Pickering. The work will consist of the introduction of french drains to remedy the seepage problem and revegetation of the embankment. Res. 11 70 Moved by: E.H. Card Seconded by: C. F. Kline RESOLVED THAT: Erosion control work be carried out at the rear of .558 Pine Ridge Road and vicinity' (Rouge River watershed), Town of Pickering, at an estimated cost of $3,600.00; and THAT the benefiting property owner be required to pay"an amount of $350.00. CARRIED; 35. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control and Slope Stabilization in The Regional Municipality of York: Proposed Remedial Work - Hayhoe Avenue, Town of Vaughan (Humber River Watershed) A staff communication was presented advising that remedial work is proposed at the rear of Nos.86-ll0 Hayhoe Avenue, Town of Vaughan. The work will provide approximately 45 metres of rip rap protection along the existing bank and revegetation of the embankment. Res.Un Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: Erosion control work be carried out at the rear of Nos. 86-110 Hayhoe Avenue (Humber River watershed), Town of Vaughan, at an estimated cost of $9,300.00: and '!'HAT the approval of the Ministry of Natural Resources be requested, AND FURTHER THAT the benefiting property owners be required to pay an amount of $400.00. CARRIED, 36. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Proposed Slope Protection Study - Northwest of Don Valley Parkway and Lawrence Avenue, City of North York (Don River Watershed) A staff communication was presented advising that The Municipality of Metropolitan Toronto Roads Department concrete channel in the vicinity of the Don Valley Parkway and Lawrence Avenue is to 'be transferred to the Authority following completion of repair work along certain sections of the channel. The Metropolitan ROads Department has agreed to have 'the Authority study and carry out the required work at their cost prior to the Authority assuming responsibility for future maintenance of the channel. A proposal from An~ew Brodie Associates Inc., Consulting Engineers, ~as presented showing an estimated total study cost of $12,000.00, of Which the Authority's portion would be $4,800.00. Res. 1172 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: The staff communication having regard to proposed slope protection study, northwest of Don valley Parkway and Lawrence Avenue, B-l32 -16- City of North York ,(Don River watershed), together with the proposal of Andrew Brodie Associates Inc., Consulting Engineers, be received; and THAT the staff be directed to retain the firm of Andrew Brodie Associates Inc., Consulting Engineers, to study the slope instability problem at the northwest corner of the Don Valley Parkway and Lawrence Avenue, in the Borough of North York (Don River watershed), at an estimated cost of $4,800.00. CARRIED, 37. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Environmental Review of Flood Damaqe Centres A staff communication was presented advising that at Executive Committee Meeting #5/79, held April 25, 1979, James F. MacLaren Limited was commissioned to locate all flood damage centres and provide damage curves, as well as suggest remedial measures. The remedial measures decided on will be evaluated as to their cost in relation to the benefit they provide. While flood damage is the major cost, environmental alterations or loss is another cost which must be considered before making a decision on the solution to the flood problem. It is proposed that Proctor and Redfern Limited carry out an Environmental Review of the Damage Centres as determined by James F. MacLaren Limited.. Res. 1173 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: Proctor & Redfern Limited be retained to carry out an Environmental Review of Flood Damage Centres at an estimated cost of $23,000.00., CARRIED, 38. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Extra Flood Plain Mapping - Humber River Watershed: Change Order #3 A staff communication was presented advising that it has been foUnd necessary to obtain extra mapping in certain areas along the Humber River to obtain sufficient information required in calculating the new floodline elevations. In this regard, the following Change Order has been received from the firm Marshall Macklin Monaghan Limited to provide for the extra mapping: Change Order #3 ........ $1,512.00 Res. #174 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: Extra Work Order 13 to the contract for the mapping of the Humber River by Marshall ~cklin Monaghan Limited, in an amount of $1,512.00, be approved. CARRIED, 39. ,WATERFRONT PROJECT 1977-1981 -Etobicoke Sector: Mimieo Creek Dredging A staff communication was presented advising that dredging is required at the mouth of the Mimico Creek to ensure that launching ramps can be used safely and to recreate a storage area. Res. 1175 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: The mouth of the Mimico Creek be dredged to remove approximately 25,000 cubic yards of material, at an estimated cost of $50,000.00, subject to the approval of the Province of Ontario. CARRIED, -17- B-133 40. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl -Proposed Erosion Control Work: 35 Canyon Av~nue, City of North York (Don River Watershed) A staff communication was presented advising that remedial work is proposed at the above location. The staff has finalized engineering design, construction specifications and preparation of tender documents, which have been submitted to the Ministry of Natural Resources for approval. Res. 11 76 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: The design for the proposed erosion con~rol work at .35 Canyon Avenue, City of North York (Don River watershed), be approved, and THAT the benefiting property owner, Mike Gold Construction Limited, be required to pay $9,000.00 and to convey approximately 2.3 acres of land as a prerequisite to carrying out remedial work. CARRIED, 41. REPORT Il/79 - HUMBER'VALLEY ADVISORY BOARD Report 11/79 of the Humber Valley Advisory Soard was presented. Res. 1177 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: Report fl/79 of the Humber Valley Advisory Board be received, and 'l'HAT Recommendations fl and 12, as contained therein and set forth herein, be approved: !! The policy contained in the Interim Plan: Conservation and Recreation Land Management, dealing with the management of Authority lands by municipalities, include provision for enforceable measures to be taken to ensure appropriate maintenance standards; 12 The staff be directed to investigate the feasibility of obtaining a copy of the film "Nonpoint 83" for use by the Authority in promoting land management techniques suitable for the reduction of pollution. CARRIED, 42. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Drainage A staff communication was presented having ,regard to the annual flooding of a field immediately south of the dormitory building at the Lake St. George Conservation Field Centre. Res. '17 8 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The contract for the drainage of the field south of the Lake St~ George Conservation Field Centre, including trenching and 40 feet of lS" dia. corrugated pipe, be awarded to Leonard Construction COmpany at the price of $1,430.00. CARRIED, 43. KORTRIGHT CENTRE FOR CONSERVATION -Construction of Trails: Quotation for Stone and Gravel A staff cOmmunication was presented advising that the following quotations have been received for the supply of stone and gravel for the construction of trails at the Kortright Centre for Conservation: B-134 -'18- Indusmin Nelson Limestone 2- & 3/4- crusher run via tandem $5.30/ton $5.45 No reply via trailer 4.60 5.25 1/4- screenings via ~andem 5.30 4.97 via trailer 4.60 4.50 1-, 2- , 3/4n clear via tandem ,5.40 5.45 , chips via trailer 4.60 5.25 Gabion Stone via tandem 5.62 5.75 3-5",4-8",6-8n via trailer 5.42 Rip Rap via tandem 6.90 oneman Stone 8-l2" via tandem 6.74 Res. 1179 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received from Indusmin for the supply of stone and gravel for the,building of trails at the Kortright Centre for Conservation, up to the maximum amount of 600 tons, be accepted, it being the lowest quotation received. CARRIED, 44. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Washrooms and Shower Rooms: Seamless Flooring and Wall Finishing A staff communication was presented advising that the following quotations have been received for seamless flooring and epoxy wall finish for the washrooms and shower rooms at the Lake St. George Conservation Field Centre: Seamless Flooring Wall Duron Ontario Limited $2,200.00 $980.00 Brooks Marble & Tile Co. 2,888.00 No bid Emazite Epoxy Flooring 3,100.00 No bid Res. 1I180 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The contract for the seamless flooring and epoxy wall finish in the washrooms and shower rooms at the Lake St. George Conservation Field Centre bunkhouse be awarded to Duron Ontario Limited, it being the lowest quotation received. CARRIED' NEW BUSINESS 45. MEETING 11/79 - R.D.H.P. ADVISORY BOARD MRS. MARTIN advised the members that Meeting *1/79 of the R.D.H.P. 'Advisory Board will take plaee on Thursday, May 24, 1979, commencing at 10:00 a.m. at the Lake ,St. George Conservation Field Centre. Members of the Executive Committee wishing to attend will be welcome. 46. OFFICIAL OPENING OF THE KORTRIGHT CENTRE . FOR CONSERVATION The Director of Planning & POlicy advised that the Official Opening of the Kortright Centre for Conservation will take place on June 21st. The Deputy Premier, Hon. Robert Welch, O.C. will officiate at the ceremony in place of the Premier, whose schedule will not permit his attendance on this occasion. ' 47. STUDENTS MRS. GELL requested that a letter be written to the Ministry of Natural Resources advising that the Authority could accommodate more than the allocated number of students. -19- B-135 48. EXECUTIVE COMMITTEE MEETING - JUNE 13, 1979 MR. BREEN invited the Committee to hold the meeting scheduled for June 13, 1979, at his,Caledon home. 49. ADJOURNMENT On Motion, the meeting adjourned at 12:50 p.m., May 16. R. Grant Henderson W.A. McLean, Dizector of Plannin!r , Policy 'Chaizman Acting Secretary-Treasurer 1 9 79 BUDGET REV I S ION S PAGE: 31 PROGRAM: Water 8 Related Land Management - Interim Project Capital - All Benefiting DATE: May 11. 1979 o RIG I N A L BUDGET REV I 5 E D ' , BUDGET Sources of Financing Sources of Financing Net Provincial ~lunicipal Net Provincial Municipal ACTIVITY Expenditures Grant Levy Other Expenditures Grant Levy Other Plan Review A-55' Provincial Grant 397.000 218.350 178.650 - 297.000 163.350 133.650 - Plan Review B - 90' Provincial Grant - - - - 75.000 67.500 7.500 - Environmental Monitoring 100.000 55.000 45.000 - 100.000 55.000 45.000 - Flood Plain Acquisition 642.273 353.250 289.023 - 667.273 367.000 300.273 - Headwaters Acquisition 200.000 110.000 90.000 - 200.000 110.000 90.000 - Reforestation 10.000 . 5.500 4.500 10.000 5.500 4.500 - - . Stream llIIprovements 20.000 11.000 9.000 - 20.000 11.000 9.000 - Milne Workshop - - - - 20.450 11.248 9.202 - en n :I: tIJ C c:: t'" tIJ . )I . Total 1.369.273 753.100 616.173 - 1.389.723 790.598 599.125 - III I .... IN en II' I ... w 1 9 7 9 BUDGET REV I S ION S 'PAGE: ~ 30 PROGRAM: Water & Related Land Management - Interim Proj~ct Capital - All Benefiting DATE: May 11. 1979 PURPOSE: To provide for increased provincial cash flow received under the Federal/Provincial Flood Damage Reduction Program. FUNDING: A 90\ rate of grant is available on $75.000 Flood Plain Mapping. The total increase in the budget is $2~.450. being financed by $11.248 Provincial Grant and $9.202 Municipal Levy. The reduction in the municipal proportion to 10\ results in surplus municipal levy of $17.048. EXECUTIVE APPROVAL: AlIfHORITY APPROVAL: . .~ B-138 , the metropolitan toronto and region conservation authority minutes Report 11/79 EXECUTIVE COMMITTEE WEDNESDAY-MAY-30-l979 11/79 The Executive Committee met in "The Studio", Guild Inn, Scarborough, on Wednesday, May 30, 1979, commencing at 10:00 a.m. PRESENT WERE Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members, M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner C.F. Kline E.V. Kolb Dr. T.H. Leith M.D. Lipton, Q.C. Mrs. S. Martin J.S. Scott Authority Member K. McCreary Ministry of Natural Resources, Central Region R.D. Hunter Secretary-Treasurer K.G. Hiqgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. ~ Property & Administration Division W.E. Jones Executive Secretary Mrs. K. Conron Research Planner, Planning & Policy Mrs. A.C. Deans Supt'd. of Operations, BCPV N. Elliott Head, Flood Control Section, WRD J .C. Mather Senior Administrative Secretary Mrs. M. Mitchell Supervisor, Accounting Services, Finance Divn. Mrs. M. Mosseau Supervisor, Property Administrat~on, P&AD D.J. Prince Engineer - Regulation Control, WRD R. Saadia ABSENT WAS Member Mrs. L. Hancey The Chairman introduced Mr. R.D. Hunter, Regional Conservation Authorities' Programme Co~ordinator, Central Region, Ministry of Natural Resources. ANNOUNCEMENTS Mr. Henderson advised that a letter had been received from Mr. Paul Pickett, Q.C., tendering his resignation from the Waterfront Advisory Board in view of his appointment to the Bench. A letter of appreciation of his valuable service will be sent to Mr. Pickett on behalf of the staff. At Meeting '6/79, the Committe~ was invited to hold the June 13th meeting at the Caledon home of Mr. Breen. The June 13th meeting will now be held at the Authority office and the meeting scheduled for July llth at Mr. Breen's residence. MINUTES The Minutes of Meeting '6/79 were presented. Res. U8l Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The Minutes of Meeting '6/79, as presented, be adopted as if read. cARRIED , B-l39 -2- SECTION I .' '.' . '. ' - THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION:OF THE AUTHORITY'AND RECOMMENDS THEIR ADOPTION: 1. SUPPLEMENTARY PROJECT TO THE INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT: 1979-l98l FOR THE DREDGING OF THE KEATING CHANNEL, DON RIVER A staff communication and project brief wer.e presented having regard to the proposed dredging of the Keatl.ng Channel. Res. #182 Moved ba: Dr. T.H. Leith Seconde by: ,Mrs. J .A. ~rdner RESOLVED THAT: The Supplementary Project to the Interim Water and Related Land Management project 1979-l98l for the Dredging of the Keating Channel, Don River, as appended as Schedule "A" of these Minutes, be adopted; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT the following action be taken: (i) The Municipality of Metropolitan Toronto be requested to approve the Supplementary Project, be designated as the benefiting municipality and contribute 45% of the Authority's share of the works undertaken in the years 1979 through 1985: (H) The Province of Ontario be requested to approve the Supplementary Project and to provide a grant of 55% of the Authority's share of the works undertaken in the years 1979 through 1985: ( Hi) The Ontario Municipal Board be requested to approve the Supple- mentary Project pursuant to Section 23 of The Conservation Authorities' Act; (iv) The implementation of the Supplementary project be conditional upon the other participants - the Toronto Harbour Commissioners and the Federal Government - approving their share of the funding; (v) Authority officials be authori~ed to take whatever action is required in connection with the Supplementary proje~t, including the execution of any necessary documents, CARRIED; SECTION II " - THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 2. SOIL CONSERVATION SOCIETY OF AMERICA - THIRTY-FOURTH ANNUAL MEETING: JULY 29-AUGUST 1, 1979 CHATEAU LAURIER, OTTAWA, ONTARIO -Attendance at Res. U83 Moved by: Mrs. J.A. Gardner Seconded by: E.H. Card RESOLVED THAT: The following members be authorized to attend the Thirty- Fourth Annual Meeting of the Soil Conservation Society of America in Ottawa, July 29-August l, 1979: Mrs. F. Gell: Mrs. J.A. Gardner; R.G~ Henderson; E.H. Card: Mrs. S. Martin: J.S. Scott; C.F. Kline; Dr. T.H. Leith; and THAT their expenses, in connection therewith, be paid. CARRIED; 3. FINANCIAL REPORT AND ACCOUNTS -April, 1979 Mr. Scott presented the Financial Report and Accounts "for the month of April, 1979. Res. 1184 Moved by: J.S. Scott Seconded by: Mrs. J .A. Gardner RESOLVED THAT: The Financial Statement for the month of April, 1979, be " -3- B-140 received; and that payment of the Authority Accounts, in the amount of , $650,378.45, being (a) Current Expenditures - Wages and Salaries $285,349.66: Mater~als and Supplies $207,662.34; (b) Capital Expenditures - Wages and Salaries $22,493.92: Materials and Supplies $l34,872.53, be approved. CARRIED; 4. USE OF EMPLOYEE-OWNED TRUCKS A staff communication was presented advising that, at Meeting #6/79, the Executive Committee authorized the increase in rates payable to staff using their own vehicles to l3-3/4~ per kilometer, effective June l, 1979. A recommendation should have been included to increase the rate payable to staff required to transport with their own trucks bulky or heavy equipment or to trail a piece of Authority equipment, to l7-l/4~ per kilometer. Res. 1185 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: Where an employee is required to transport bulky or heavy equipment, or is required to trail a piece of Authority equipment with his own truck, he shall receive a travel allowance of l7~l/4~ per kilometer, effective June l, 1979: and THAT authorization to pay travel allowance under this regulation shall be obtained in each individual case from the Administrator responsible. CARRIED; 5. REPORT 11/79 - HISTORICAL SITES ADVISORY BOARD Report 11/79 of the Historical Sites Advisory Board was presented. Res. #186 Moved by: M.D. Lipton, Q.C. Seconded by: C.F. Kline RESOLVED THAT: Report #l/79 of the Historical Sites Advisory Board, as amended, be received and the Plan of Development: Black Creek pioneer Villaqe, dated May 9, 1979, be appended as Schedule nBn of these Minutes; and THAT the following action be taken: ((!l) A Visitor Centre at the Black Creek Pioneer Village, to consist, in the f~r~t phase of approximately l~,OOO square feet, and providing accommodatl.on for ~tudent assembly, tl.cket taking, washrooms, cafeteria and snack bar, gift shop and sales outlet, storaqe and mechanical consistent with the principles established for the Visitor Centre be approved; , (b) The Metropolitan Toronto and Region Conservation Foundation be requested to establish a fund-raising programme for the Black Creek Pioneer Village Visitor Centre, and that the staff be directed to prepare the necessary display materials for the Foundation: and further That concurrently with the preparation of the display for the Foundation, a building committee be established to conduct a study regarding: (i) the final design ( ii)' the phasing, if any (Hi) preparation of a budget and that negotiations be carried out with Raymond Moriyama or other architects, as the building committee may decide, to deter- mine final design and costs; (c) The location of the workshop and maintenance area be confirmed in the southeast corner of the Black Creek pioneer Village property, as recommended in the 1964 Plan of Development; (d) The staff investigate the means of enlarging the secured area of the Village to include the valley lands south to Shoreham Drive. CARRIED ; B-l41 -4- 6. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Borough of Scarborough To construct a storm sewer outfall into the Highland Creek in the area south of Military Trail, east of Highcastle Road A staff communication was presented advising that an application has been received from the Borough of Scarborough for a permit to construct a storm sewer outfall into the Highland Creek at the ,above location. Res. il87 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the Borough of Scarborough, be received: and THAT the application of the Borough of Scarborough for a permit to undertake the construction of a storm sewer outfall into the Highland Creek in the area south of Military Trail, east of Highcastle Road, Borough of Scarborough (Highland Creek watershed), be approved, subject to: (a) All gabion works being preceded by a filter mat or a 6"-l2" layer of crushed stonel (b) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Metropolitan Toronto Parks Departmentl (c) A silt trap being installed at the outfall during construction in order to minimize the silting of the creekJ (d) An easement being obtained to enter and do work on Authority- owned landJ (e) The gabion baskets on the bank of the creek being keyed into the bank. CARRIED; 7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Markham To replace bridges carrying l8th Avenue and the 9th Concession Road over the Little Rouge River, Lots 25 & 26, Concession VII, and Lot 20, Concessions VIII .& IX, Town of Markham (The Regional Municipality of York) A staff communication was presented advising that an application has been received from the Town of Markham for permission to replace two existing bridges crossing the Litt~e Rouge River at the above location. Res. US8 Moved by: Mrs. F. Gell Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the Town of Markham, be receivedJ and THAT the application of the Town of Markham for a permit to undertake the replacement of the bridges that carry l8th Avenue and the 9th Concession Road over the Little Rouge River, in the area of Lots 25 and 26, Concession VII and Lot 20, Concessions VIII and IX, Town of Markham (The Regional Municipality of York), Rouge River watershed, be approved, subject to: (a) All rip rap works being preceded by a filter mat or a 6--12- layer of crushed stone: (b) All areas disturbed due to construction being restored to the satisfaction of the AuthoritYJ (c) Every effort being made to minimize the silting of the creek during construction. CAJUUED; -5- B-14 2 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Borough of Etobicoke To cqnstruct a pedestrian bridge across Renforth Creek, a tributary of the Etobicoke Creek, as it flows through Bloordale Park, west of Highway #427, north of Bloor St. A staff communication was presented advising that an application has been received from the Borough of Etobicoke for a permit to construct a pedestrian bridge across the Renforth Creek at the above location. Res. ,11189 Moved by: E.H. Card Seconded by: M.W.H. Biggar RESOLVED THAT: The staff communication, together with the application of the Borough of Etobicoke, be received: and THAT the application of the Borough of Etobicoke for a permit to undertake construction of a pedestrian bridge across the Renforth Creek, a tributary of the Etobicoke Creek, as it flows through Bloordale Park in the area west of Highway #427, north of Bloor Street, Borough of Etobicoke (Etobicoke Creek watershed), be approved, subject to: (a) All gabion and rip rap,works being preceded by a filter mat or a 6"-12" layer of crushed,stone; (b) The gabions on the bank of the creek being keyed into the bankJ (c) ,Every eftort being made to'minimize the silting of the creek during construction: (d) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARR:IED; 9. APP~ICATION FOR PERMIT UNDER ONT~IO REGULATION 735/73 Yelodim Limited To construct a storm sewer outfall into the Etobicoke Creek just south of Derry Road, east of Dixie Road, City of Mississauga (The Regional Municipality of Peel) A staff communication was presented advising that an application has been received f~r permission to construct a storm sewer outfall into the Etobicoke Creek at the above location. Res. U90 Moved by: E.V. Kolb Seconded by: M.J. Breen RESOLVED THAT: The staff communication, together with the application of Yelodim Limited, be received: and THAT the application of Yelodim Limited for a permit to undertake the construction of a storm sewer outfall into the Etobicoke Creek in the area just south of Derry Road, east of Dixie Road, City of Mississauga (The Regional Municipality of Peel), Etobicoke Creek watershed, be'approved, subject to: (a) All rip rap works being preceded by a filter mat or a 6R-12" layer of crushed stone: (b) Every effort being made to minimize the silting of the creek during constructionJ (c) The steep bank to the valley floor being properly stabilized and covered after construc~ion; (d) Sanitary manhole number 1A being equipped with a watertight cover, (e) All areas disturbed due to construction being restored to the satis- faction of the Authority and of the City of Miss'issauga. CARRIED; B-l43 -6- lO. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 .. 280277 Ontario Limited -&- Pine Tree Development Co. Ltd., To con~truct a vehicular bridge to carry Glen Shields Ave. across the ~est Branch of the Don River, ,north of Steeles Ave., west of Dufferin Street, Town of Vaughan (The Regional Municipality of York) A staff communication was presented advising that an application has been received from 280277 Ontario Limited -&- Pine Tree Development Company Limited for permission to construct a vehicular bridge across the w~st Branch of the Don River at the, above location. Res. #19l Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff communication, together with the application of 280277 Ontario Limited -&- Pine Tree Development Company Limited, be received; and THAT the application of 280277 Ontario Limited -&- Pine Tree Development Company Limited for a permit to undertake the construction of a vehicular bridge to carry Glen Shields Avenue across the West Branch of the Don River in the area north of Steeles Avenue, west of Dufferin Street, TOwn of vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) All gabion and rip rap works being preceded by a filter mat or a 6"-l2" layer of crushed stone: (b) Every effort being made to minimize the silting of the creek during constructionr (c) All areas disturbed due to construction being restored to the satisfaction of the Authorityr (d) The Town of Vaughan being satisfied with the detailed design of the bridge structure and the channel works. CARRIED r ll. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 HaWIDan Plymouth-Chrysler Incorporated To divert a section of a tributary of the Humber River, Part of Lot 3, Concession VII, Town of Caledon A staff communication was presented advising that an application has been received from HaWIDan Plymouth-Chrysler Incorporated for permission to divert a section of a ,tributary of the Humber River located on the east side of Highway i50, south of the Village of Bolton. Res. #192 Moved by: Mrs. F. Gell Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of Hawman. plymouth-Chrysler Incorporated, be receivedr and THAT the application of HaWIDan Plymouth-Chrysler Incorporated for a permit to divert a section of a tributary of the Humber River on Lot 3, Concession VII, TOwn of Caledon, be approved, subject to: (a) All work being undertaken in accordance with drawings submitted, as prepared by A. Kalaycioglu: (b) The applicant complying with the existing by-laws, and regulations for the Town of Caledon: , , (c) All work being carried out to the satisfaction of the Authority: (d) Approval being received from the Ministry of Natural Resources; (e) Every effort being made to minimize silting of the creek. CARRIED, -7- B-144 12. DATA PROCESSING A staff report was pr~sented advising that consideration has been given by the staff to the use of data processing systems in the Authority's operation. An independent consultant ip the field, Gordon Mo1nar & Associates Limited, has been contacted and discussion held as to the type of information requi~ed to enable the Authority to make the proper decisions regarding effective use of data processing equipment. A study of the Authority's operations, at a cost of $lO,920.00, is required to analyze current and future needs. Res. 1193 Moved by: M.W.H. Biggar Seconded by: E.H. Card RESOLVED THAT: The staff report having regara to the use of data processing systems in the Authority's operation be received: and THAT the subject be referred to the Finance Sub-Committee for consideration and report to the Executive Committee. CARRIED; 13. THE REGIONAL MUNICIPALITY OF DURHAM -Request for Permanent Easement A staff communication was presented advising that a request has been received from The Regional Municipality of Durham to provide a permanent easement for a watermain required on the north side of Bayly Street, west of Valley Road in the TOwn of Aj ax . The proposed easement affects Authority-owned land known as Part of Lot 13, Concession I, Town of Ajax, designated as Parts 3 and 4 on Plan 40R-4993. Res. 1194 Moved by: Mrs. F. Gell Seconded by: M.J. Breen RESOLVED THAT: A permanent easement for a watermain be granted to'The Regional Municipality of Durham, required on the north side of Bayly Street, west of Valley Road in the Town of Ajax. Said easement is shown as Parts 3 and 4 on Plan 40R-4993. The Authority-owned land affected is Part of Lot l3, Concession 1, Town of Ajax, The Regional Municipality ,of Durham. Said easement to be granted for the nominal consideration, of $2.00, subject to The Regional Municipality of Durham being ~e~ponsible for carrying out and paying all legal, survey and other costs involved in the transactioni and THAT the appropriate Authority officials be authorized and directed to.sign the necessary documents to give effect thereto~ CARRIED, 14. TOWN VAUGHAN -Disposal of Surplus Authority-OWned Land Res. 1195 Moved by: E.V. Kolb Seconded by: M.D. Lipton, Q.C. RESOLVED THAT: A 53.201 acre section of the former Estate of George Groves property, being Part Qf Lot 32, Concession x, Town of Vaughan, The R~gional Municipality of York, locat~d west ,of the Ontario Hydro-owned property, be considered as surplus to the requirements of the Authority; and THAT the Secretary-Treasurer be directed to advertise this land for sale by public tenderi AND FURTHER THAT The Chairman and Vice Chairman of tpe Authority and the Chairman of th~ Flqod Control and Water Conservation Advisory Board be appointed a committee to open the tenders and'report to the Executive Committee with a recommendation. CARRIED, 15. BOROUGH OF SCARBOROUGH -Disposal of Surplus Authority-Owned Land Res. 1196 Moved by: E.H. Card Seconded by: J.S. Scott B-14 5 -8- RESOLVED THAT: A 0.52l acre, more or less, section of the former W., M.G. and G.A. Hozy property, being Part of Lot l8, Concession II, Borough ofScarborDugh The Municipality of Metropolitan Toronto, located on the northeast corner of Progr~ss Court and Markham Road, be declared as surplus to the requirements of the Authority: and THAT the Authority request approval of the Minister of Natural ,Resources ih accordance with the provisions of Section 43 of the Expropriations Act, and the issuance of an Order-in-Council under Section 20(c) of T~e Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended, authorizing sale of the subject property to the Armenian General Benevolent Union of Canada Inc. at,a sale price of $75,000.00; AND FURTHER THAT the Authority not object to the property being filled to grade level and being rezoned to conform wi~ the zoning on the adjacent lands; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED: 16. TOWN OF CALEDON - Glasgow Road' - Village of Bolton A staff communication was presented advi~ing that at Council Meeting held on March 26, 1979, the Town of Caledon adopted the following resolution: "RESOLVED that whereas the maintenance of Glasgow Road is becoming increasingly expensive and that road maintenance is very difficult largely because of an impossible drainage correction problem, be it resolved: That the Town of Caledon request M.T.R.C.A. to begin a procedure to do a study on the area to determine the best way to modify the river channel in order to provide an improved road bed and drainage system.- Res. #197 ' Moved by: E.V. Kolb Seconded by: M.W.H. Biggar RESOLVED THAT: The Authority advise the Town of Caledon that it does not con- sider it necessary at this time to carry out remedial work on the Humber River at Glasgow Road in Bolton: and THAT the Town' of Caledon be, further advised that the Authority will be carrying out minor drainage works on the valley wall under its Erosion Control Programme in The Regional Municipality of Peel scheduled for 1980; and FURTHER THAT the staff be requested to assist the Town of Caledon in considering alternative means of widening Glasgow Road satisfactorily. CARRIED; 17. HARBOUR CLEANING A staff 'communication was presented having regard to a position paper on Harbour Cleaning prepared by the Toronto Harbour Commissioners., The paper deals exclusively with pollution clean-up, oil and debris. It does not deal with maintenance dredging. Res. 1198 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Toronto Harbour Commissioners' Position Paper on Harbour Cleaning be'received: and THAT the Authority advise the Toronto Harbour Commissioners that it regrets there is no role for the Authority in participating in this work. CAlUUBD; 18. REPORT #1/79 - OFFICIAL OPENING SUB-COMMITTEE - Kortright Centre for Conservation Dr. Leith presented Report *l/79 of the Official Opening Sub-Committee - Kortright Centre for Conservation. Res. #199 Moved by: Dr. T.H. Leith Seconded by: E.H. Card D'I:'C!nT"'Ii'n ",u..",_ gQnn~~ .lJ7Q n~ ~hg Official OOeninQ Sub-Committee -Kortright -9- B-l46 Centre for Conservation, as amended, be received: and THAT the following action be taken: . (a) OFFICIAL INVITATION The preliminary "Official Invitation" be approved: (b) GROUP MAILING LIST The preliminary "Group Mailing List" be acceptedJ (c) PROGRAM AND PLATFORM PARTY The preliminary "Program" and "Platforni Party", as amended, be approved for use for the Official Opening of the Kortright Centre for Conservation. . 19. REPORT #1/79 ~IED; -CONSERVATION FARM SUB-COMMITTEE Mr. Kolb presented Report '1/79 of the Conservation Farm Sub-Committee. Res. '200 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED ~AT: Report '1/79 of the Conservation Farm Sub-Committee, as amended, be received, and THAT the fo~lowing' action be taken: (a) The Glassco and Lake st. George farms not be used by the public or by groups, for interpretive purposes, in their present condition; (b) Regular major maintenance be carried out by the Authority ~rom revenue received from farm renta~: (c) Revenue from farm rental reflect the market value of the crop land and the residence. 'The barns, other farm buildings and pasture be charged at nominal rates: (d) Policies' consistent with those developed for the Albion Hills Conserva,tion Farm apply to the farms at Lake St. George and GlasscoJ '(e) The staff review the Authority policies related to the Albion Hills Conservation Farm and investigate the feasibility of incorporating these, or similar pOlicies, into an agreement for the operation and visitation of the Glassco and Lake St. Geo~ge farms; (f) The Committee Chairman investigate with the Executive Committee the availability of funding for initial improvements to the Glassco and Lake St. George farmsJ (g) The staff be requested to prepare estimates for the required initial maintenance and repair of facilities at the Glassco and Lake St. George farms. CARRIEDJ 20. QUOTATION '79-26 -Hammer Knife Mower A staff communication was presented advising that the following quotations have been received for the supply and delivery of one hammer knife mower with trade: Nobleton Farm Service $1,842.54 Don Vallance Equipment .2,193.50 W.R. Buckle Equipment Limited 2,537.70 Duke Lawn Equipment Limi ted 2,861.19 The above prices include Federal and Provincial Sales Taxes. Res. 1201 Moved by: E.V. Kolb Seconded by: Mrs. J .A. Gardner B-l47 -lO- RESOLVED THAT: The quotation received from Nobleton Farm Service for the supply and delivery of one hammer knife mower, with trade, in the sum of $l,842.54, including Federal and Provincial taxes, be accepted: it beiriq the lowest quotation received. " CARRIED: 21. MILNE CONSERVATION AREA -Town of Markham ' , . A staff communication was presented advising that at Meeting of Council held March l3, 1979, Council approved a motion from the Parks & Recreation Director recommending that the Town assume the operation and maintenance 'of the Milne Conservation Area. The following resolution was received from the Town week of May 2l: "Moved by C. Bell Seconded by B. Sherwood THAT the Town of Markham assume the operation and maintenance of the Milne Conservation Area for a three (3)- year period, 1979, 1980 and 1981, subject to the following: (a) The Metropolitan Toronto and Region Conservation Authority transferring to the Town the funds received from the Ministry of the Environment, i.e. $7,800.00 in 1979, $6,200.00 in 1980 and $3,lOO.00 in 1981. (b) The Town of Markham having the option to continue operating this area after the three ( 3) year period OR of turning this " responsibility back to the Metropolitan Toronto and Region Conservation Authority. AND FURTHER THAT subject to a Lease Agreement being executed with the Metropolitan Toronto and Region Conservation Authority, the beach operation at Milne 'Dam be transferred to the Milne Conservation Area together with the budget allocation. , , Resolution Carried." Res. '202 Moved by: Mrs. S. Martin Seconded by: J.S. Scott RESOLVED THAT: The ,staff be directed to develop a suitable lease agreement between the Corporation of the ~wn of Markham and The Metropolitan TOronto and Region Conservation Authority to permit the Town of Markham to aSSUMe the operation and maintenance of Authority-owne~ lands known as the Milne Conservation Area. CARRIED, 22. PURCHASE OF REPRINTS OF ARTICLES APPEARING IN THE JOURNAL OF SOIL & WATER CONSERVATION Res. '203 Moved by: E.H. Card Seconded by: M.W.H. Biggar RESOLVED THAT: A suitable quantity of reprints of the following articles, appearing in Volume 34, 12, March/April edition of the Journal of Soil and Water Conservation, be purChased: The Great Lakes - Geology at Work: by Walter M. TOvell -and- A Framework for Nonpoint Pollution Control - Great Lakes Basin: by,Murray Johnson and Norman Berg CARRIED; 23. ADJOURNMENT On Motion, the meeting adjourned at 12:45 p.m., May 30th. R. Grant Henderson K.G. Higgs Chairman secretary-Treasurer B-148 SCHEDULE "A" 'THE METROPOLITAN 'l'ORON'1'O AND REGION CONSERVATION AU'l'HORIft' SUPPLEMEN'l'ARY PROJBC'1' '1'0 THE IH'l'BRIM WATER AND, RELATED lAND ~GEMENT PROJECT 1979 - 1981 POR THE DREDGING OF' '1'HE KEATING CHANNEL DON RIVER MAY 1979 B-149 ... " A SUPPLEMENTARY PROJECT TO "THE INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT 1979-l98l FOR THE DREDGING OF THE KEATING CHANNEL - DON RIVER 1. SUBJECT A Suppleme~tary project ~o the Interim Water and Related Land Management project by the Metropolitan Toronto and Regi~nConservation Authority describing additional work to be carried out and the funding required for the work. 2. DETAILED DESCRIPTION (i) Purpose: The purpose of this Supplementary project is to provide part of the funding required to dredge the Keating Channel at the mouth of the Don River in order to minimize the potential flood hazardJ minimize pollution to the Inner Harbour; and make the northeast corner of the harbour usable for shipping. (11) Backqround: The Keating Channel is the man made mouth of the Don River where it empties into the northeast corner of Toronto's Inner Harbour. Each year about 60,000 cubic meters (m3) of sediment comes down the Don and deposits in the Keating Channel. Along with the sediment comes pollutants which are derived from urban development upstream and adhere to the fine grained sediment which is deposited in the Channel and to those which are carried on out into the Harbour. The deposition of this material wi thin the Keating Channel and the Inner Harbour makes it virtually unusable for shipping. This same siltation restricts the flow' of flood waters and thus greatly increases the potential for flooding particularly as a result of ice jams. When it was dredged, the Keating Channel acted as an effective sedimentation trapJ now polluted sediments flow directly into the Harbour degrading its quality for ancillary recreational uses. (A report by the TOronto Harbour Canmissioners' Engineering ~epartment entitled: "Dredging and Endikement Project" describes the problems in more detail.) In 1972, Canada and the United States signed a joint agreement to improve water quality in the Great Lakes system. One important result was a complete ban on the open water disposal of polluted dredgeate. Up until 1974 the Toronto Harbour CoIIInissioners was able to dispose of the polluted dredgeate in a reasonably economic fashionJ the __.L."-_~ ...__..:1 _.... ...."'_ ....:__ "'!!!U!!I ..~ 'hi........ +'hA ""a...A....;.:al undAr ~'h.A a.dvaIlC!!ina- B-l5(, - 2 - ' fill at the OUter Harbour Headland. However, as a result of the bsn on open water dumping, the dredging was discontinued principally because of the high cost of any acceptable alternatives. (iii) Description of Works: The disposal in a satisfactory manner of the pollu~ed sediments of the Keating Channel is the key to a satisfactory solution to the dredging. The TOronto Harbour commissioners have proposed a new endikement off the south side of the OUter Harbour Headland built of clean trucked fill and armoured with rubble. This spit would serve to contain the polluted dredgeate in order to meet the requirements of environmental agencies. The location shown is the only location where an endiked area, of sufficient size to be economical, could be built and serve as a disposal site for the Keating Channel dredgeate. To date 400,000 m3 of sediment has accumulated in the area to be dredged. To dredge this material and the 60,000 m3 that deposit each year, will require a 7 year phased dredging programme as shQWD on the following table: JWount to Year be DredQ'ed 1979 -60,000 m 3 1980 80,000 1981 120,000 1982 120,000 1983 260,000 1984 120,000 1985 60,000 820,000 m 3 The 7 year programme is required for two reasons:'the first is the rate of development of the endiked area: it will take seven years to enclose an area which will acCOlll'llOdate not only the initial 820,000 m 3 but another 15-20 YC:lars of dredgeate as well: and second: the dredging occurs in a very confined area and equipment must dig itself in on a gradual basis. The detailed phasing of the operation is contained in the -Dredging and Endikement project" report prepared by the Toronto Harbour Commissioners. In brief te~s, ~he material will be dredged with a derrick fitted out with a clamshell bucket and loaded into bottom dumping scows which will be taJcen by tug to the disposal site and released. It is also important to recognize that the dredging requirement will not be complete after 7 years. 3 60,000 m per year will continue to accumulate and arrangements must be made to solve that continuing __...!I~___"""'_...I..-J__ __ """"-'_..L.. ..lL..._...!I___._ _____.___ .!II_ ____ B-l5l - 3 - 3. COST/FINANCING The cost of this project is based on the estimates of the Toronto Harbour Commissioners and will be spread over 7 years as shown below. The costs have been based on $5 per cubic meter and include engineering, dredging, surveying, environmental monitoring, reporting and any special protection required at the , disposal site. No cost is anticipated for the construction of the endikement since a ~5 per truck load disposal charge made by the Toro~to Harbour Commissioners should cover all costs associated with this part of the work. The dredging wi~i be carried out by the Toronto Harbour Commissioners as the , ' proponent; hOJliever, it is recognized that,the'problem is not their entire responsibility and that several areas of the community will benefit from the work. A cost sharing formula has been proposed, therefore, on the following basis: The Toronto Harbour commissioners - one third of total Government of Canada - one third of total The Metropolitan Toronto and Region Conservation Authority - one third of total ANNUAL COSTS Cost for each Year, Total Cost Participant 1979 $ 300,000 $100,000 1980 $ 400,000 $133,000 1981 $ 600,000 $200,000 1982 $ 600,000 $200,000 1983 $1,300,000 $433,000 1984 $ 600,000 $200,000 1985 $ 300,000 $100,000 The Authority will fund the project on the following basis; Province of Ontario 55" Authority Share (Metropolitan Toronto) 45" B-152 - 4 - OVer a 7 year period this means: . ANNUAL AUTHORITY FUNDING Metropolitan Province Toronto of Ontari" Year Portion Portion :l2Y! 1979 $ 45,000 $ 55,000 $ 100,000 1980 $ 59,850 $ 73,150 $ 133,000 1981 $ 90,000 $110,000 $ 200,000 1982 $ 90,000 $110,000 $ 200,000 1983 $194,850 $238,150 $ 433,000 1984 $ 90,000 $110,000 $ 200,000 1985 S 45.000 S 55.000 S 110.000 '1'O'l'ALS $614,700 $751,300 $1,366,000 The Municipality of Metropolitan Toronto is designated as the benefiting municipality. The funding provided as part of the current Interim Water and Related Land Management Project are ccmmitted for flood and erosion control works and acquisition. This Supplementary Project will pr~vide the funds required in order to be able to carry out the dredging work proposed. 4. REVIEW The Toronto Harbour Commissioners, as the implementing agency, will provide t:he Authority with regular progress statements on Which payment will be based. At the end of each year the entire dredging and disposal operation will be reviewed as to accomplishments of the previous year and the ext:ent: of the underta1cing proposed for the subsequent year with a view to cost-s.ving Wherever ppssible. The review will be carried out in conjunction with the Municipal! ty of Metropoli tan Toronto and the Province of ontario. . ' B-l53 SCHEDULE "B" , " PUN OF DEVELOPMENT BLACK CREEK PIONEER VILLAGE , . , . ,',TH~ METROPOLITAN TORONTO AND REGION CoNSERVATION AuTHORITY MAy 91 1979 B-154 PLAN OF DEVELOPMENT 'BLACK CREEK PIONEER VILLAGE 1. INTRODUCTION The Executive Committee of the Authorit~ at its Meeting #20/78,considered a communication from The Metropolitan Toronto and Region Conservation Foundation recommending that the Authority consider requesting the Devonian Group of Charitable Foundations for financial assistance for the Black Creek Pioneer Village Visitors' Centre. A design concept for the proposed Black Creek Pioneer Village Visitors' Centre had earlier been considered by the Historical Sites Advisory Board and endorsed for forwarding to The Metropolitan Toronto and Region Conservation Foundation. The Authority's Executive Committee and the Foundation did not endorse the design concept. In view of this, in considering the recommendation of the Foundation,the Executive Committee took the following action: "THAT the staff be directed to prepare a report for consideration by the Executive Committee, dealing with the concerns expressed in the consideration of the concept for the Centre, prior tQ the Executive Committee acting on the recommendation of the Foundation." The concerns expressed were as follows: · - the estimated cost was considered to be excessive in relation to the total investment in the Pioneer Village in terms of a fund raising project - the cost of operating the Centre and the potential revenues were not clearly set out - the relationship of the Centre to an updated Master Plan for Village development was not fully addressed - there is an immediate need for improved facilities for food and shelter for school groups visiting the Village and improved facilities for the gift shop and snack bar - although the development of the full facility was not seen as Deinq feasible or desirable in one stage, it was recognized that the capability of the Visitors' Centre to be expanded to include additional facilities to the basic requirements for food, gift shop and shelter was necessary." The purpose of this report is to review the plan of development for the Black Creek Pioneer Village in order to provide a planning context for consideration of the Visitors' Centre and to review the Visitors' Centre proposals in order that the concerns expressed can be addressed. 2. BACKGROUND The Black Creek Pioneer Village began as a project of the Humber Valley Conservation Authority as the Dalziel Pioneer Museum and the Dalziel Conservation Area. When The Metropolitan Toronto and Region Conservation Authority was established in 1957 the work begun in the valley of the Black Creek at the Dalziel site was expanded south of Steeles Avenue with the restoration of a qroup of pre-l867 buildings which were existing on site. 2.1 Report on the Pioneer Village - 1964 A comprehensive report on Pioneer Village was adopted by the Authority'in 1964. The major recommendations of the report, dealt with the followinq matters: - The Metropolitan Toronto and Regio~ Conservation Foundation was requested to explore means of o~taining fin~ncial assist~nce for the completion of the Pioneer Village as a Centennial project - a new fee structure for the Village was ad~pted . - the area north of Steeles A~enue west of Jane Street was desiqnated as an agricultural community and it was recommended that a hardwood bush and field crops appropriate to pre-Confederat~on be est~l~she~ B-155 - 2 - ,_ that the Dalziel Barn be restored to its original condition as a stock barn _ that the Dalziel House be restored when it becomes available _ that a sawmill be established at or near the original site of the mill north of Steeles Avenue _ that the extension of Pioneer Village be undertaken and that the following buildings, in order of priority, be considered: . tavern . printing shop . manse and driveshed . weaver's shed . apothecary shop . gunsmith'S shop . cooperls shop . woodworking shOp . sawmill . dwelling _ that the Authority progressively provide heat to all the major restored buildings, that the restored area be fenced _ that the Village collection be limited to the provision of the necessary articles for exhibiting in the present restored buildings together with future proposed restorations _ that the Authority provide staff for the enlargement of the education program at Pioneer Village - that the Authority establish the necessary utilities (hydro, water and sewer connections) to service the Village. 2.2 Master Plan for the Black Creek Conservation Area - 1964 At the same time that the Pioneer Village's development was being reviewed, the Authority adopted a Master Plan for the Black Creek Conservation Area which is the site of the Village. The Master Plan dealt with the development of the site, traffic, both vehicular and pedestrian, location of the workshop, the adminis- trative building, a reception area and landscape plantings. The major recommendations of the Master Plan were: _ the development of the main vehicular entrance to the Village off of the Murray Ross Parkway and the location of the parking area to the south of the vehicular entrance _ the development of the reception area which would comprise the proposed reception centre with displays, auditorium, offices, lavatories and the entrance court which was to be an open area in front of the reception centre. The entrance court would provide a transition point between the car and the Village and a collection point where families and friends could meet, tours could gather and visitors could rest before and after the tour of the Village _ a workshop and service area fronting on Murray Ross Parkway _ a pedestrian underpass was recommended to connect the Dalziel area and the Village under Steeles Avenue. Figure 1 shows the Master Plan as it was adopted. 2.3 Updated Master Plan - 1968 An addition to the Master Plan was adopted in 1968 dealing with the valleylands south of the Village to Finch Avenue. This plan made provision for: _ foot access from the restored area, York University and the residential areas into the valley - exclusion of all vehicular traffic from the valley, - a valley walkway system _ an area adiacent to Finch Avenue was reserved for the future development - 3 - B-l~6 at the site of the,one time,Indian Village - the construction of a Visitors' Centre was recommended - the construction of the parking area recommended in the original Master Plan providing 750 parking spaces was recommended. 2.4 Report on Black Creek pioneer Village - 1969 This report reviewed the recommendations made in the 1964 report and reported on the progress. The recommendations of the report included the following: _ policy adopted in 1964 regarding the development and operation of the Village was confirmed _ further expansion of the restored area was limited to the completion of the following: . print shop . weaver's shed . Town Hall . gunsmith's shop . and restaurant facilities in the basement of the Half Way House - the staff was directed to study alternative arrangements for the development and administration of lands south of Shoreham Drive - the Authority agreed to continue to subsidize the Black Creek Pioneer Village within budget limits and a concerted effort was made to make as many operations as possible self-sustaining - the office of the senior administrative staff of the Historical Sites Division was to be located at the Authority Headquarters - the Foundation was requested to consider the establishment of an endowment fund for the maintenance of the Black Creek Pioneer Villaqe - 24 hour security and an improved fire detection system was established - the Historical Sites Advisory Board was requested to prepare a report on the feasibility and cost of establishing a pre-l867 narrow-gauge railway at Black Creek Pioneer Village. 2.5 Summary The majority of the recommendations made in the reports dealing with the Black Creek Pioneer Village and the Black Creek Conservation Area have been completed and the Village operates very much as recommended in the various reports. There remains the following major recommendations which have not been completed: - the construction of a Visitors' Centre and reception area - the maintenance building remains on its original site and has not been re-located as recommended in the Master Plan - the valleylands south of Shoreham Drive have not been developed and no suitable management has been achieved. The valleylands between Shoreham Drive and the southerly limit of the Village have been developed as the Peacock Woods and are managed by the Authority - the Indian Village Site remains undeveloped - the small-gauge railway has not been pursued - the restorations which remain to be completed are the Richmond Hill Manse; the sawmill, the Sawyer's House, the Cooper's Shop and the conversion of the Dalziel area to a stock barn and farm. 3. DEVELOPMENT AND USE OF THE BLACK CREEK PIONEER VILLAGE The development at the Black Creek Pioneer Village, both the restoration and the area development, has progressed in an orderly fashion over the 22 years since the first visitors came to the Dalziel Pioneer Museum. There has been a very marked relationship between the grow~h of the Village in terms of numbers of restored buildings and growth in attendance. In 1958 there were approximately 17,500 visitors to the Dalziel Museum and attendance has ~teadily cl~mbed to FIGURE 1 'I ..... U1 -....J --- I -- ~ I MASTER PLAN BLACK CREEK PIONEER VILLAGE AS ADOPTED 1964 1. PARKING AREA 2. RECEPTION CENTRE 3. WORKSHOP ':,"':";'" ':1,:, 'l,r'srT:' TliNDERPASS . , ~ l'.l 0: . I 15 " III ' 8 m I I I "'" ~ ' i .., ., , . 'Ill ~ I 1:11 n ' , .. , 'j....: ,., j .-,.. ,. . r i ~ ~ ;.... ,.. ~. ..,.... T' .. ~ !' i .. ., i !: ' r ~ ; . T' f - , ~ ' " 00 -..-- --- I.---~- -H~il,._~-:-I_~ .Ji--l'-i---- --..~.-I;=-:gl----~I.-!.. --.. . . .~ i · ~ = ." .11:i~ ~~I I i5 i:! ,,:! '!!j B z: III ~ I ~ fl! ti ~ ~ e; B g;o;l ~ ,; w , ! B Ii! a III I [.0 ~ L:li "5::) to III ili !2 ,a I'" III III Ji , ,,' "'QZ~ci'1 ~ foo" tl "'... 6 III "l::1 '" Ii! 8 !i! OZiI: .., CD t-4 Z III I N en = en o. 8C .!i!,._..__oo_ ~--I::~-I--'III-__.::L_-!i--L~!!I--2o--;;--_._-~~,-o""" _.,1 I ' Ii! ~ .. III ti 1111 n ti ~ o:t: z -;fi... 1 .. 0 .1 z =.. I '... '5111e;"'~ if'" [.0 ~ ' t t!~ eell ...~"'. ~,,;;,.iI .. .."" ~ H h' . ~ ~.! ~"~ ~ fi E e". ~ ~. B ~, ~ 3:0000 . -_ __ _1 . ' : ' I .. .. I" I" ... ., ,-I . . I ::: : '. r ..' . . . ...~-l -' " ,;, ::,:-',': IILACI CREEl PION ERVI !.AGE , " .., J>; rENDAI CE RE TED A'1"I'EN ANCE 300,000 ~ ......... ~ - .' . . , 19 7-197 ~ $2.50 ~ 00 , .. I $3 00 I . '" _: '; . : _': : .: . FIC URE 2.. , , .., . 275-000 '..' , .:" 00 .' - m S2,01 . ~. .. .. ... . - . -. ... . . - .. . -. .. . .. .. .. ..- .. ... - . . . . - . . . -. .- . . "of . .. .. -... of . -- ., . .-. - -. ... . .. . . '0- t_ . ... .... . _. ... . _. . . .-. . .. ....-.. --.' .. . . .. . ::50000.. : ',:':: :: ~:;: ':::: . :, ":' .. ,: ',' , " - $1.71 . ~. ... ...._. .0 _ _. . . . _ .. . .. . . ~ . ." . . ... ... ........ ... -. ..... .- . .. - ... . " -:,'-:.::~. :~': ::,:', .:.::, ',:: ::, ::' ,:'," " ,.. -I ' .., .. - ......... .. ... .. ... ...... ., . .. .... ... . . ..... . . . 22'5-000 ,': :':1.':.1' ::1 i:"-- :1' <' 'I' ': 1 ' -:' , HI' .. ... .. ., ... .... .. ... .. .. . .,. . . .-. .. . ..... .. _.. .... . ..: ' :: ' , :: :', :::'-:','::'. , ' ," :. '$1.5 ' - ,.. . -........ ..-. .... ... . .. ... ..... . . . . . . . .. ...... _.. ...0 ... . ... .. . . ..0 .... ... . _. .... .. _. ... _ . . . ....0 _ . ~OO.CCC , ' ,:, '.. 00" :'.. " : 00 . ;- - i- ------------ --~-~ ---~-~ -- -==-~ ~~~- ---~-=----- n_-__ -- .... ... -.. . .. . . . . -...... '" .. . .... .. . .....- .. .. .... . . -.. .. .. . . ... .....- .. ................. ... .. . .. . . . .. -... . . . . . . .. .... ... . .. . - . . ......... ... .. . ... ... .. . . . . . . . . .. . . . - .. .. . . :.o... ..... ... ...... .. ... ..... " . . - . . . . . .... ...... _0.... '" ... . :75-OOC----,:~.--:-1 :-- - :::.:=::-: :~:: >.-- :-~- 'Q-.: ,: 'j - /----, , ......... ..... . n.. . ... .. ..... . _. . . .. -.. - .. ..... . .. . . . ... .. _. - ... ... - .. . .. ... " . . .. -.. ... . -... ...... .... ......... ........ ... ..... - .. ... . ... ...-.--,-... ..-. ---... .-... ..~. ..-.. ......... -... .... . . .. ... . , , '.'::::--.:' '~:':: -:':::: .,:,:: ~:;: ,:::.. :,~:- ::- $1.0 ''- " . '::,' " :SO-occ ----:-: ..., ':":'. ::.' :':: ':Jt1' , ~ l l l~ .. .. ....... .... .... .. .., . . .... . . ............... . . ... ... .. . -. .. -.. . " .. . .. . ............. ... ... .. . , ' . .' - .' "... ''1' .. ..' ., . .. . " , " . , , - ". . , : ,', ,: :, ,-:.:' :::: ::!: :: : ' :, ..::, :, , - " , : ,',' , ' . :25.000 : .1'.:1:;' .:: ;::; '~;v" ":"'1::; .,: :'., , , ;, , , ' r'l~n'l .. ......... ...... .... .. . .. ... ....... I. . ...... ... .... .. . . . . .. t... ... .. .... 1 .... . '. . . . -. . . .... ., t. . '" . ... .. .... ... . . :oo~-~. ' , 'IJ: : . ~ ~:rn. <:L' , . - ; .>T~.I { . "1-- ,----- -c~c- c-__ "c~~,__~_ .c_,_~~ ~~~- ----:-~ -~ -- _.0._ .... ... .. " ... .. . I . ... I . .. .. " ..... . '" '" .. I." .... .. .. I .. ... .. .. . . ..... .... . .. .... .... '" . t.. .... . ..., .. . " I. .... '" .... . . . .. ""1. ... ... . ,. . . u75-{)oo' -7-' . , ' ~~...:..:.." '" - -' -- ~ ~ - -- ~ ----~- --- ~~- ....' " , : :' ,":' " , SCHOO TOUR! , ,,' , " "','" , ." -- - . ," ,,' 00 , ,,'..,.., ,__ .........., , :' ':. ...' . ,,: ,:' ,:. ',;,,00 / r-..... _ .,. .. '" " .. ., 1""""'-.. ......- . ... ... - - - 50 000 --- -- ---.. -- --- --- ---=- ...:..:..:.. .:..--.:. - - -./- --- -- - -- - ___I --- .-- .-.- ' ... --." I .. . ~ 1 " '/ . '. . '.2500~ ..----- .,.., y ~.- --- "-';;'- .-... ,-,1/ .-- "- .,:, -.-- . .- u, --., -.-- --. .,-- ..,. .. .' . / /1 ' RAt.,. I'prlGRi MM.: o 25C.L-- - I _ -- --I I I 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 196B ICl69 1970 I!UI 197? 1973 1974 1975 1976 1977 1978 1979 B-l59 - 6 - 1978 where the visitation was just under 300,000. The visitation made dramatic increases following the opening of the Burwick House, the Dickson Hill School, the Laskey Emporium and the snack bar. There was another major increase in 1967 which was the Centennial year and followed the opening o~ the Half Way House. Attendance increased dramatically again in 1970 following the opening of the Roblin's Mill in 1968 and the Town Hall in 1970. There also were periods of decline following fee increases but in each case, attendance rebounded and continued to climb within two years. Figure 2 illustrates the growth in attendance in relationship to the opening of restored buildings. The Figure also shows the growth in school tours and the craft program. Growth in these areas is not as dramatic because there is a limitation on the numbers that can be accommodated. The relationship between the addition of new facilities and large increases in attendance is an important consideration in assessing future development at the Village. Equally important in assessing future development at the Village are the costs in operation which have accompanied the growth of the Village and the funds available for development. Since 1957 land acquisition and development of the Black 'Creek conservation Area has cost $l,728,500.00. No land has been acquired since 1967 and area development since 1975 has been minimal. Land costs and area development have been funded jointly by the Province of Ontario and the participating municipalities. Over the same period of time the development and restoration of the Black Creek Pioneer Village has cost $1,177,647.00. These are the actual expenditures made on Village building restorations and the acquisition of Village furnishings. The actual value of the Village restoration cannot be calculated because a large portion of the value is represented by donations of buildings and artifacts which have not been valued. A large proportion of the costs in the Village restoration have been met through donations to the Authority through The Metropolitan Toronto and Region Conservation Foundation. The municipalities have participated in a small proportion of the restoration cost. Accompanying the growth in visitation to the Village,which has paralleled the growth in the restored area, have been increased revenues and increased operating costs. Since 1975 the excess of cost over operating revenue has averaged $103,000.00 per year. The loss sustained each year varies according to attendance but the general trend is increasing. The excess of cost over revenue is met through the payment of a Museum Grant from the Province of ontario (in 1979 $72,000.00) and a levy on the municipalities (in 1979 $67,000.00). The burden on the municipalities has been significantly reduced by the payment. of the Museum Grant and the addition to revenue of interest from the Black Creek Grow~h Endowment Fund (in 1979 estimated at $lO,OOO.OO). In summary, it is clear that the growth of attractions at the Village does result in increased attendance. It also results in increased operating costs which,when accompanied by consistent inflation, outstrips increasing revenues at an increasing rate. Future development and management of the Village must be directed at offsetting this trend. Steps have already been taken in 1978 and 1979 in the management of the Village to achieve economies in the use of staff, energy, and equipment. Steps have also been taken to significantly increase revenues through the sale of products manufact'ured by the artisan and demonstrator staff. The revenue producing capability', as well as the contribution to increased visitation, of new development at the Village, should be a factor in determining priorities. 4. DEVELOPMENT PROPOSALS The review of reports prepared on the Pioneer Village set out in Section 2 identified a number of development proposals which had been made for the Village' and not yet completed. This section deals with these. 4.1 Visitors' Centre In all of the rep,orts prepared on the Black Creek Pioneer Village since 1964 the necessity and desirability of a facility, variously described as a reception centre or a visi t:ors' centre, has'been identified. Since 1964 the means of providing such a facility have been given serious consideration on three occasions. The most recent of these is the proposal made to the Historical Sites Advisory Board for a visitors' centre in 1978. A brief description of the - 7 - B-160 status of this proposal will be of assistance. At Meeting .lO/74 of the Authority's Executive Committee the staff were directed to: . "invite proposals from several architects for preliminary design of a Visitors' Centre at the Black Creek Conservation Area and that such centre be so designed that it could be developed on a modular- phasing principle." At Meeting #l6/74 the Executive Committee authorized the selection of the firm of Raymond 'Moriyama Architects and Planners for the design of the Visitors' Centre. In accordance with Executive Committee instructions a conceptual desiqn of the Visitors' Centre was prepared and was considered by the Historical Sites Board at their Meeting il/78, at which time the Advisory Board recommended: -the design concept for the Black Creek Pioneer Village Visitors' Centre be endorsed and forwarded to The Metropolitan Toronto and Region Conservation Foundation for consideration." In dealing with this recommendation the Executive Committee at its Meeting .3/78 agreed to forward it to the Foundation for review and comment but declined to take any further action. The Foundation reviewed the proposal and declined to take any action. The main points of discussion concerninq the Visitors' Centre proposal were outlined in Section 1 of this report. The concept for the Black Creek Pioneer Village Visitors' Centre as prepared by Raymond Moriyama Architects and Planners was designed to be built in two phases. Phase I of the proposal involved 23,890 square feet and provided for an entrance area, student assembly area, washrooms, access corridor, gift shop and storaqe, cafeteria and kitchen, concession area and service and utility area. Phase II of the proposal provided an administration area, museum space, work- shOp, two theatres, a dining room, additional washrooms, storage area and a continuation of the access corridor. The Executive Committee and the Foundation felt that the cost of the project was excessive. The maintenance and operating costs of the facility and the revenues it was expected to generate were not included in the proposal. A staff study has now been completed on operating costs and anticipated revenues and is attached as Appendix 1 of this report. In summary the staff study concludes that without the addition of the Visitors' Centre, the visitation to the Village is likely to remain at its present level of approximately 300,000 per year. With the addition of the Visitors' Centre visitation to the Village could be expected to increase by approximately 30% at the end of a five year period. The increases in visitation anticipated would be related to year-round dining facilities, improved accommodations for inclement weather and winter activities, facilities suitable for increasing the business volume related to special functions, particularly weddings, and the attraction of the facility and the capability of the museum and theatre component for special shows. This is a realistic estimate and is substantiated by the increases in attendance which were noted in earlier years when major facilities were added. There would be a corresponding increase in revenues from entrance fees but more importantly, substantially increased revenues from the food and sales outlet components of the Centre. Offsetting the revenues would be the estimated maintenance and operating costs which after a five year period, would be anticipated at $ll3,000.00 per year. At this point the balance of cost to revenue would be favourable. If, in the phasinq of the construction of the Visitors' Centre, those components which produce revenue as well as service were given priority, a cose-revenue balance would be even more favourable. Revenues would be maximized :maintenance 90sts would be in proportion to the square footage built. : From the review of all of the reports dealing with the Black Creek Pioneer Village and the consideration given recently to a Visitors' Centre some principles to guide decisions emerge. - a Visitors' Centre has been recognized at the outset ~s an important asset to the Village both from the point of view of contributing to the quality of the visitor's experience and generating revenues. - the cost of the full facility which is considered desirable and B-16l - 8 - necessary has been a major obstacle. The phasing of the provision of the components which make up the Visitors' Centre should give first priority to those components which offer service and generate revenue. These are ticket collection and student assembly, gift shop and Village craft sales outlet, restaurant and snack bar. The concept which has been prepared for the Visitors' Centre indicates that 14,000 square feet are necessary to accommodate these functions. - a Visitors' Centre facility should have a low architectural profile so as not to dominate the village, provide for a smooth flow of pedestrian traffic, make the revenue producing facilities easily accessible both coming and going into the Village, and be designed to reduce as much as pdssible energy costs. _ the centre should have the capability of being expanded to include the full range of services. _ the cost of the facility constructed in each phase must be within the capability of the Authority. The design concept for the Black Creek Pioneer village visitors' Centre is consistent with all of these principles except that dealing with cost. It would, therefore, be appropriate to consider in the first phase of the Visitors' Centre only those components which provide for student assembly and ticket taking, restaurant and snack bar and the gift shop. These occupy approximatelY l4,000 square feet or 58% of the Phase I proposed in the design concept. 4.2 Maintenance Building and Service Area The existing maintenance building and service area is located in the northwest corner of the parking area adjacent to the pedestrian entrance to the Village. The Master Plan prepared in 1964 recognized that this was an inappropriate location for the service area and recommended that it be located in the south- east corner of the Village grounds. A number of alternative locations for the maintenance building and service area have been considered, none of them being entirely satisfactory in terms of visual impact and beinq well located to properly perform the service function. It has been concluded that the recomm- endation made in the Master Plan to locate the service area in the southeast corner of the Village is the best alternative. 4.3 Valleylands South of the Restored Area to Finch Avenue The valleylands south of the restored area are in two sections: the val.ley south of the restored area to Shoreham Drive and the valley south of Shoreham Drive to Finch Avenue. The section between the restored area and Shoreham Drive has been developed as the Peacock Woods. Because this area does not form a part of the secured area of the Village and is accessible to the public at all times, maintenance has been difficult and litter and vandalism a problem. The area is a very important component of the approach to the Village and will become more important when the Visitors' Centre has been built. The means of including this area in the secured portion of the Villaqe should be investigated. The valley lands of the Black Creek lying south of Shoreham Drive and extending to Finch Avenue have not been developed as recommended in the 1968 Plan. Funds for the development have not been available. The problems of litter, vandalism and motorized vehicles, mainly trailbikes, have been increasing. A large residential community has been developed adjacent to the west bank of the valley and the east bank is bounded by the Authority's Administrative Head- quarters ip the north, York University in the middle section and a residential community to the south at Finch Avenue. The Conservation and Recreation Land Man~gement Plan which is currently being considered by the Authority and member municipalities recommends that this portion of the Black Creek be transferred to Metropolitan Toronto under the Authority's agreement for management by the Metropolitan Toronto Parks Department. Should this recommendation prove to be the most appropriate means of managing this section of the valley, the Authority should retain the right of a connecting access between Black Creek Pioneer ,Vill~ge and Finch Avenue to the location of the Indian Village Site. 4.4 Indi~n Village and Small-Gauge Railway These remain proposals which are not feasible at the present time. No further action concerning them is recommended at this time. 4.5 Restored Area Earlier reports have identified a plan for the restored area including the - 9 - B-162 I REG. MUNIC. OF YORK /' --- MUNIC. OF METROPOLITAN TORO\JTO L .'IlC.L !!! ...... O"ICI 1. VISITOR CENTRE SHOREHAM DR 2. WORKSHOP AND SERVICE 3. PEACOCK WOODS (TO BE INCLUDED IN SECURED AREA) 4. VALLEY LANDS - RECOMMENDED FOR TRANSFER TO METRO s: RICHMOND HILL HANSE 6. SAWYER'S HOUSE AND SAWHILL 7. STOCK BARN AND FARM 8. PROPOSED PROPERTY EXTENSION 9. COOPER'S SHOP INDIAN VILLAGE - If BLACK CREEK . - - - - - B-l63 - lO - buildings and types of architecture to be represented in the Village. In Section 2.5 it was pointed out that the restorations which remain to be completed are the Richmond Hill Manse, the sawmill, the Sawyer's House, the COoper'$ Shop and the conversion of the Dalziel area to a stock barn and farm. In addition to this, consideration should be given to extending the restored area of the Village northward to the C.N.R. Railway and including a small parcel of land and a period building which is existing on the site, if and when the land and building becomes available. These restorations should proceed as funds become available. 5. RECOMMENDATIONS IT IS RECOMMENDED THAT the report of the Black Creek Pioneer Village Develop- ment be received and the following action be taken: (a) THAT a Visitors' Centre at the Black Creek Pioneer Village,to consist of approximately l4,000 square feet and providing accommodation for student assembly, ticket taking, washrooms, cafeteria and snack bar, gift shop and sales outlet, storage and mechanical, consistent with the principles established for the Visitors' Centre,be approved: (b) THAT The Metropolitan Toronto and Region Conservation Foundation ,be requested to establish a fund raising program for the Black Creek Pioneer Village Visitors' Centre and that the staff be directed to prepare the necessary display materials for the Foundation: (c) THAT the location of the workshop and maintenance area be confirmed in the southeast corner of the Village property as recommended in the 1964 Plan of Development; (d) THAT the staff investigate the means of enlarging the secured area of the Village to include the valleylands south to Shoreham Drive; (e) THAT,should the valleylands south of Shoreham Drive to Finch Avenue be transferred to Metropolitan Toronto for management under the Authority's agreement, that the right of access from Pioneer Village to the Indian Village Site be retained and that the Indian Village Site be preserved for future study and development: (f) THAT the restoration program at the Black Creek Pioneer Village continue in order to complete the following facilities, Richmond Hill Manse, sawmill, Sawyer's House, the Cooper's Shop and the conversion of the Dalziel area to a stock barn and farm: and that consideration be given to extending,the northern boundary of the Village property to the C.N. Railway line to include the property with the house,which is within the Village period,should the property become available. WAM/mm 1979.05.09. B-164 FINANCIAL IMPACT VISITORS CENTRE BLACK CREEK PIONEER VILLAGE THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY MAY 1 , 1979 A!)pend 1x 1 B-165 1 GENERAL ASSUMPTION 1) It is assumed that the Visitors Centre will operate on, a year-round basis and that before 198~the Village would also be operated year-round. 2) It is further assumed that the Centre will contain approximately 53,000 square feet of floor area. and will include all the facilities as outlined in the Moriyama plan. 3) An adequate Visitors Centre will enable visitors to favourably compare the Village with the new Family Leisure Centre near Maple. 4) For the purpose of this study. it is assumed that the Centre will be in operation by July 1. 1980. 5) It is assumed that the inflation factor over the five years of this study will increase by approximately 8% per annum. 2 B-l66 VISITOR VOLUME It is assumed that the vtsitation without the Visitors Centre will stabilize at around 300,000 per annum. It is further assumed that !!1h the Visitors Centre the attendance will gradually increase in four or five years by 30%. 1979 1980 1981 1982 1983 Visitation Without Centre 300.000 300,000 300,000 300.000 300.000 Visitation With Centre 300.000 310.000 350.000 365.000 390.000 , B-167 3 ENTRANCE FEES It is ISsumed that the entrlnce' fees will !!9.1 increase betwen 1979 Ind 1983. !!Z! 1980 l!!l 1982 1983 - - -- Entrance Fees $405.000 $418.000 $473.000 $493.000 $526.000 4 B-168 FOOD SERVICES The food service gross, in 1978 was $400,OQO and M.T.R.C.A. revenue is approximately 10%. It is assumed that the Centre will have facilities for a dining room, cafeteria and snack bar. The dining room in both the Centre and Half Way House will be available for receptions, banquets and catering for , . seminars and small conventions. It is assumed that Half Way House will have a lower-priced. tavern type menu. 1979 1980 1981 1982 ~ Snack Bar $ 200,000 $ 200,000 $ 200.000 $ 200.000 $ 200.000 Half Way House 200,000 200.000 150,000 200,000 200.000 Centre - 100,000 200.000 300.000 300.000 400,000 500.000 550,000 700,000 750.000 MTRCA Revenue (10~) 40.000 50,000 55,000 70.000 75.000 B-169 5 SALES OUTLETS It is assumed that there will be adequate space for displaying Village produced items. souvenirs and crafts. Special emphasis will be placed on the sale of Canadiana books. The profits on gift shop items is approximately 25S and on Village products 50S. 1979 1980 1981 J1R 1983 Gift Shop - $ 167.000 Gross Revenue $ 190.000 $ 225.000 $ 250.000 $ 275.000 MTRCA Revenue (251) 45.000 47,500 55,000 62.500 69.000 Village Products - S 105.000 Gross Revenue $ 120,000 $ 130.000 S 140.000 $ 150.000 MTRCA Revenue (50S) 52,500 60,000 65.000 70.000 75.000 6 8-170 EXPENDITURES 1 ) It is assumed that it will be necessary to employee one extra gift shop clerk. 2) It is assumed that an extra person will be employed for cleaning and maintenance purposes. 3) It is assumed that security will include monitoring equipment and that one additional person will be required for peak hours only, 4) It is felt that the maintenance costs are realistic. 5) Heating, air conditioning and electricity costs are based on the Moriyama report. 1979 1980 1981 1982 1983 1 ) Gift Shop Clerk - $ 5.500 S 12,000 $ 13,000 $ 14,000 2) Cleaning ~ Maintenance Person - 6,500 14,000 15,000 16.000 3) Securi ty Person - 13.500 29,000 31,000 33.000 4) Maintenance Costs - 2,500 15,000 16,000 17,000 5) Heating, Air Conditioning, - 13.500 29,000 31,000 33.000 Electricity - 41.500 99.000 106.000 113.000 " I ... .... ... SUMMARY OF REVENUE . EXPENDITURES 1m. 1!!2 1.!!1. 1982 1983 REVENUE $ $ $ $ $ Food 40,000 50,000 55,000 70,000 75,000 Gift Shop 45,000 47,500 55,000 62,500 69,000 V1.11age Products 52,500 60,000 65,000 70,000 75,000 Seminars . Lectures . 8,000 12,000 14,000 15.000 Admissions 405.000 418.000 473.000 493.000 526.000 Total Revenue with Centre 542,500 583,500 660,000 709.500 760,000 Total Revenue WTifiOut C,ntre * 542.500 564.000 587.000 610,000 ,634,000 Increased Revenue !!!!!. Centre - 19,500 73.000 99 ;500 126,000 Additional Expend. with Centre . 41,500 99.000 106.000 113.000 Additional Revenue with Centre - 19,500 73,000 99.500 ' 126.000 . 22,000 26.000 6.500 (13.000) * These figures assume'!!! increase in attendance, no increase in admission fees. and an' 8S yearly increase in all other revenue. .... N r.- .... I III SUMMARY OF REVENUE & EXPENDITURE FOR PHASE ONE . REVENUE 1979 1980 1981 1982 1983 -r- -r- ,- ,- ,- Food 40,000 50,000 55,000 70,000 75.000 Gift Shop 45,000 47,500 55,000 62.500 69.000 Village Products 52,500 60.000 65,000 70.000 75,000 Se~inars & Lectures - - - - - Admissions 405,000 418,000 473,000 493,000 526,000 Total Revenue with Centre 542,500 575.500 648,000 695,500 7';5,000 Total Revenue without Centre *542,500 564,000 587,000 6l0,000 634,000 Increased Revenue with Centre - 11.500 61,000 85,500 111. 000 Additional Expend. with Centre - 35,000 85,000 9l.000 97.000 Additional Revenue with Cantre - 11 , 500 61,000 85,500 111,000 NET CHANGE 23,500 24,000 5,500 (14,000) * These figures assume no increase in attendance, no increase in admission fees, and an 8' yearly increase in alr-other revenue. ~ , B-173 the metropolitan toronto and region conservation authority minutes Report '8/79 EXECUTI~ COMMITTEE WEDNESDAY-JUNE-13-l979 f8/19 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, June 13, 1979, commencing at lO:OO a.m. PRESENT WERE Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & Policy Mrs. A.C. Deans Head, Waterfront Section, WRD B.E. Denney Development Co-ordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather Supervisor, Property Administration, P&AD D.J. Prince ABSENT WAS Member Mrs. L. Hancey CHAIRMAN I S REMARKS The Chairman read a letter received from Mr. Charles Sauriol, Projects Director for The Nature Conservancy of Canada, dated June 6, 1979, conveying thanks to the Authority for its participation in and support of the Leskard Commemorative Forest. The Chairman also read a letter received from Mr. J.R. Powell, General Manager of the Upper Thames River Conservation Authority, expressing appreciation of the time and effort extended by the Chairman, Executive Committee and staff of The Metropolitan Toronto and Region Conservation Authority in preparing and hosting the visit of members and staff of the Upper Thames Authority to Black Creek Pioneer Village, Kortright Centre for Conservation, Boyd Conservation Field' Centre and the McMichael Canadian Collection, on Thursday, May 3l, 1979. MINUTES The Minutes of Meeting '7/79 were presented. Res. 1204 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The Minutes of Meeting #7/79, as amended to include "Summary of Revenue & Expenditure for Phase One" to Schedule "B", be adopted. CARRIED; B-174 -2- SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS ITS ADOPTION: 1. THE METROPOLITAN TORONTO AND REGION : CONSERVATION FOUNDATION - APpointment of New Members The Metropolitan Toronto and Region Conservation Foundation presented a communication having regard to the appointment of new members to the ..' Foundation. Res. #205 Moved by: Mrs. F. Gell Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The communication of The Metropolitan Toronto and Region Conservation Foundation, having regard to the appointment of new members to the Foundation, be received: and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The follow~ng recommendation of the Directors of The Metropolitan Toronto and Region Conservation Foundation be approved: THAT Mr. Wayne L. Naughty, Partner-in-Charge of Gardner McDonald & Company: and Mr. R.S. Traquair, Vice President and Manager for the Metropolitan Toronto Area of The Royal Trust Company, be appointed as members of The Metropolitan Toronto and Region Conservation Foundation for a period of three years, effective June 22, 1979. CARRIED, SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: ' 2. SOIL CONSERVATION SOCIETY OF AMERICA, THIRTY-FOURTH ANNUAL MEETING: JULY 29- AUGUST l, 1979, GHATEAU LAURIER, OTTAWA -Attendance at Res. #206 Moved by: E.H. Card Seconded by: E.V. Kolb RESOLVED THAT: Mr. W.E. Jones, Administrator, Property & Administration, be authorized to attend the Thirty-Fourth Annual Meeting of the Soil Conservation Society of America in Ottawa, July 29-August 1, 1979, and THAT his expenses in connection therewith, in an estimated amount of $500.00, be paid. CARRIED, 3. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE -APpointment of Building Sub-Committee A staff communication was presented, having regard to the appointment of a building sub-committee for the Black Creek Pioneer Village Visitor Centre. Res. 1207 Moved by: J.S. Scott Seconded by: ~.H. Card RESOLVED THAT: The recommendation to appoint a building sub-committee for the Black Creek Pioneer Village Visitor Centre be tabled. CARRIED, 4. ONTARIO PARKS ANNUAL CONFERENCE, AUGUST 2-4, 1979, THUNDER BAY, ONT., -Attendance at The Committee considered a request from Mr. Scott A. Macpher.son, Authority member, for authorization to attend the Ontario Parks Annual Conference in Thunder Bay from August 2 to August 4, 1979. Motion~ Moved by: Mrs. F. Gell Seconded by: E.V. Kolb I -3- B-175 RESOLVED THAT: Mr. Scott A. Macpherson be authorized to attend the Ontario Parks Annual Conference in Thunder Bay, Ontario from August 2 to 4, 1979: and THAT his expenses in connection therewith be paid. THE MOTION WAS--------------------------------------------------NOT CA~ED; 5. MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES A staff communication was presented advising that at a meeting of the Executive Committee of The Chairmen's Committee of the Ontario Conservation Authorities, held May l3-l4, 1979, it was "suggested that the conservation authorities in each Region divide the local M.P.P's among them for purposes of contact to discuss the role of cpnservation authorities". Res. *208 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The Report of the Working Group on the Mandate and Role of the Conservation Authorities of Ontario be presented and discussed with all M.P.P's in the area under the jurisdiction of The Metropolitan Toronto and Region Conservation Authority: and THAT the Chairman of the Authority assign to each member of the Executive Committee responsibil~ty for presentation of the Report to individual M.P.P's. CARRIED , 6. REPORT 113/79 - FINANCE SUB-COMMITTEE Report 113/79 of the Finance Sub-Committee was presented. Res. 1209 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: Report '3/79 of the Finance Sub-Committee be received, and THAT THE FOLLOWING ACTION BE TAKEN: The report re a priority rating system for the preparation of the 1980 Budget, as appended as Schedule "A" of these minutes, be approved; The next meeting of the Finance Sub-Committee be held on Monday, June 18, 1979 at 1:30 p.m. at the Authority office. CARRIED; Res. 1210 Moved by: J.S. Scott Seconded by: Dr. T.H. Leith RESOLVED THAT: Rather than consider a proposal to have a study made on a data processing evaluation and considering the financial restrictions being imposed by the Province, Metropolitan Toronto and the respective regional municipalities, a Management Consultant be engaged to make a complete study of th6 operations of The Metropolitan Toronto and Region Conservation Authority, and that the scope and parameters be established by the Finance Sub-Committee: and THAT the cost of this study be financed first by the funds that wouid have been provided for the data processing evaluation and the balance on a deficit basis: AND'FURTHER THAT the Finance Sub-Committee interview Management Consultants and receive presentations with the object in view of submitting to the Executive Committee, at the earliest possible time, recommendations outlining the terms of reference for the management study and recommending the hirinq of a Management Consultant as selecteQ by the sub-committee, AND FURTHER THAT the members of the Personnel Sub-Committee be invited to participate in these discussions and recommendations. . , B-l76 -4- On a recorded vote_ - vo~ing "YEA" 10 Voting "Nay" 1 Mrs. F. Gell R.G. Henderson M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S." Scott THE MOTION WAS------------------------------------------------------CARRIED: 7. QUOTATION #79-27 -Parking Tickets A staff communication was presented advising that the following quotations have been received for the supply of 200,000 daily parking tickets, to be consecutively numbered in books of 50 tickets and in q~antities of 25,000 each of eight different colours: Britannia Printers Limited $1,352.91 Charters PUblishing Company 1,597.83 York printing House Limited 1,665.48 Canad~an Offset Company Limited 1,690.00 The above prices include all taxes Res. 1211 Moved by: E.R. Card Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received from Britannia Printers Limited for the supply of 200,000 daily parking tickets, consecutively numbered in books of 50 tickets and in quantities of 25,000 each of eight different colours, in the sum total of $l,352.9l, including all taxes, be accepted: it being the lowest quotation received. CARRIED; 8. QUOTATION #79-30 ALBION HILLS CAMPGROUND -Primary Hydro Line A staff communication was presented advising that the following quotations h~ve been received for the supply of material, labour and equipment for the installation of approximately l,300 lineal feet of primary hydro line, five hydro poles and necessary guy wires: Bol ton Power Line Limi ted $1,795.00 Thor Powerline 1,800.00 K-Line Maintenance Construction Limited 4,825.00 Black & McDonald 5,637.00 Res. 1212 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The quotation received from Bolton Power Line Limited for the supply of material, labour and equipment required to install approx- iRately l,300 lineal feet of primary hydro line, five hydro poles and necessary guy wires for the Albion Hills Conservation Area campground, in the sum of $1,795.00, be accepted, it being the lowest quotation received. ~IED; 9. CANADIAN NATIONAL EXHIBITION -Authority participation in the Metropolitan Toronto Exhibit A staff communication was presented having regard to Authority participation in the Metropolitan Toronto exhibit at the Canadian National Exhibition in 1979, as approved at Executive Committee Meeting 15/79. Res. t2l3 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell -5- B-l77 RESOLVED THAT: The staff communication having regard to Authority participation in the Metropolitan Toronto Exhibit at the 1979 Canadian National Exhibition be received and approved; and THAT the staff be directed to make the necessary arrangements for the construction, installation and management of the exhibit: AND FURTHER THAT funds be made available from the Water and Related Land Management budget; AND FURTHER THAT Complimentary Day Passes for selected Conservation Areas be distributed in limited quantities. CARRIED; 10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of the Environment TO cross the Little Don River valley with a forcemain, east side of Leslie Street, north from the Leslie Street Pumping Station to 800 m. north of Green Lane, Town of Markham A staff communication was presented advising that an application has been received for a permit to install a forcemain crossing the Little Don River at the above location. Res. #2l4 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application,of the Ministry of the Environment, be received: and THAT The application of the Ministry of the Environment for a permit to undertake the installation of a forcemain crossing the Don River as the forcemain extends along the east side of Leslie Street north from the Leslie Street pumping Station to 800 metres north of Green Lane in the Town of Markham' (The Regional Municipality of York), Don River watershed, be approved subject to: (a) Manholes Numbers 5 and 8 being equipped with watertight covers; (b) All gabion works being preceded by a filter mat or a 6"-12" layer of crushed stone: (c) Every effort being made to minimize the silting of the creek during construction; (d) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Town of Markham. CARRIED, 11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 TOwn of Markham For construction of a detention pond on the Exhibition Creek, a tributary of the Rouge River, just north of l6th Avenue, east of Highway #48 A staff communication was presented advising that an application has been received for a permit to construct a detention pond on the Exhibition Creek at the above location. Res. 1215, Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff' communication, together with the application of the Town of Markham, be received: and THAT the application of the Town of Markham for a permit to undertake the construction of a detention pond on the Exhibition Creek, a tributary of the Rouge River, in the area just north of 16th Avenue, east of Highway 148 in the Town of Markham (The Regional Municipality of York),Rouge River watershed be approved, subject to: (a) All areas disturbed due to construction being restored to the satis- faction of the Authority: B-118 -6- (b) Every effort being made to minimize silting of the creek during construction; (c) All rip rap and gabion works being preceded by a filter mat or a 61-l2" layer of crushed stone; (d) Approval also being obtained from the Ministry of Natural Resources; (e) The Town of Markham confirming that storm water management controls will be imposed on the developers within the drainage area but not control by tge proposed pond. CARRIED I 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Water Survey of Canada To construct a control weir on the downstream side of the new bridge over the Highland Creek on Old Kingston Road, Borough of Scarborough A staff communication was presented advising that 'an application has been received for a permit to construct a control weir on the Highland Creek at the above location. Res. #2l6 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Water, Survey of Canada, be received: and THAT the application of The Water Survey of Canada for permission to under- take the construction of a control weir on the downstream side of the new bridge over the Highland Creek on Old Kingston Road in the Borough of Scarborough (Highland Creek watershed), be approved, subject to: (a) Every effort being made to minimize silting of the creek during construction; , (b) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Metropolitan Toronto Parks Department. CARRIED; 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mendoza Restaurant and Inn To undertake shoreline improvements at rear of 12161 Lakeshore Boulevard West, Borough of Etobicoke (Wa terfront) A staff communication was presented advising that an application has been received for a permit to undertake shoreline improvements along the Etobicoke shoreline at the above location. Res. ft2l7 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the Mendoza Restaurant and Inn, be received: and THAT the application of the Mendoza Restaurant and Inn for a permit to under- take shoreline improvements at the rear of 12l6l Lakeshore Boulevard West, Borough of Etobicoke, be approved, subject to: (a) All core material required for the works being rubble or quarry stone and that no earth material be used as core material; (b) The larger rubble material along the exterior perimeter of the "- east side of the groyne being placed as opposed to simply dumped so as to minimize losses due to wave action, (c) Authority staff being notified of the completion of the works so that a site inspection may be arranged; (4) This permit not precluding any other approvals that may be required in connection with the proposed shoreline improvements. CARRIED, -7- B-179 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Consumers' Gas Company To c~oss the Humber River with proposed 4" dia. gas main on Indian Line Road, Part Lot 7, Concession VIII, Town of Caledon A staff communication was presented advising that an application has been received for permission to cross the Humber River with a proposed 4" dia. gas main at the above location. Res.",2l8 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Consumers' Gas Company, be received; and THAT the application of Consumers' Gas Company for permission to cross the Humber River with a proposed 4" diameter gas main on' Indian Line Road, on Part of Lot 7, Concession VIII, Town of Caledon, The Regional Municipality of Peel (Humber River watershed), be approved, subject to the following a~endments and conditions: (a) The crossing being restored with rip rap on the banks and bed of the river. The rip rap must be preceded by a filter mat or a 6"-12" layer of crushed stone; (b) The river configuration being maintained after construction: (c) Every effort being made to minimize silting of the creek during construction; (d) Provisions being made to allow for continuous flow in the creek; (e) All areas disturbed due to construction peing restored to the satisfaction of the Authority. CARRIED, 15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. W. Hewitt Bayley To undertake shoreline and bank stabilization works at Scarborough Bluffs at rear of #l7 Fallingbrook Drive, part of Il5 Fallingbrook Drive and part of Toronto Hunt Club property, Borough of Scarborough (Waterfront) ~ staff communication was presented advising that an application has been received for permission,to construct ~horeline and bank stabilization works at the above location. Res. '219 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Mr. W. Hewitt Bayley, be received; and THAT the application of Mr. W. Hewitt Bayley for a permit to construct shore- line and bank protection works at the rear of tl7 Fallingbrook Drive, Borough of Scarborough, be approved, subject ~: (a) Written permission being received from the property owners of '15 Fallingbrook Drive and the Toronto H~t Club for work to be carried out on their property: (b) permission being received from the property owners along the water- front allowing for access of the equipment: (c) The Authority being notifi~d at least one week prior to the start of construction: (d) Precautions being taken to prevent possible future scouring of,the toe of the retaining wall at the toe of the bluff, and that this be monitored regularly: B-l80 -8- Ce) The works being carried out as per contractor's revised report on terms and specifications: ( f) All other necessary approvals and permits being obtained. CARRIED: 16. TOWN OF MARKHAM -Request re Unionville Planing Mill Limited Res. #220 Moved by: M.J. Breen Seconded by: J.S. Scott RESOLVED THAT: Subject to obtaining an Inspection Certificate from the Ministry of Natural Resources, the Authority proceed with the purchase of the Unionville Planing Mill Limited property, being All of Lot 1, and Part of Lot 2, Registered Plan 348, Town of Markham, The Regional Municipality of York, containing 0.950 acres, more or less, together with certain improve- ments at a price of $l25,000.00, plus Vendor's legal costs7 the sum of $lO,OOO.OO being payable on or before July 3l, 1979, the balance to be covered under a first mortgage bearing interest at l.O~ per cent per annum, due and payable on January 3l, 19807 and THAT upon completion of the purchase, the Authority enter into a suitable management agreement with the Town of Markham for the restoration of the Planing Mill and maintenance of the property: AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of any additional necessary approvals and the execution of any documents. CARRIED; 17. OCCUPIERS I LIABILITY AND TRESPASS TO PROPERTY -Discussion Paper A staff communication was presented advising that the Discussion Paper on Occupiers' Liability and Trespass to Property has been reviewed in accord- ance with the request of the Ministry of the Attorney General. Res. #221 Moved by: M.J. Breen Seconded by: Dr. T.R. Leith RESOLVED THAT: The staff report and comments having regard to the Discussion Paper on Occupiers' Liability and Trespass to Property be received; and THAT the Ministry of the Attorney General be advised that the Executive Committee has reviewed the Discussion Paper on Occupiers' Liability and Trespass to PropertY7 and WHEREAS conservation authorities are empowered under Section 27(1) of The Conservation Authorities Act to make regulations regarding Fill, Construction and Alteration to Waterways and to appoint officers to enforce such regulations: THAT the Ministry of the Attorney General be requested to make provision within The Petty Trespass Act for enforcement officers appointed by a conservation authority to enter upon another person's land in the performance of their,duties7 AND FUR~ER that the Ministry of the Attorney General be requested to con- sider higher fines for trespass. CARRIED' 18. THE CONSUMERS' GAS COMPANY -Request for Permanent Easement, Borough of Scarborough A staff communication was presented advising that a request has been received from The Consumers' Gas Company to provide a permanent easement for re- location of a l6" gas pipeline located on the south side of Military Trail, west of Neilson's Road. The proposed easement affects Authority-owned land known as Part of Lot 15, Concession II, Borough of Scarborough, The Municipality of Metropolitan Toronto. -9- B-18l Res. #222 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A permanent easement be granted to The Consumers' Gas Company, required for relocation of a l6" gas pipeline located on the south side of Military Trail, west of Neilson's Road. Said easement is shown as Parts 1 and 2 on Plan 64R-6886. The Authority-owned land affected is Part of Lot 15, Concession II, Borough of Scarborough, The Municipality of Metropolitan Toronto. Said easement to be granted for the nominal consid- eration of $2.00, subject to The Consumers' Gas Company being responsible for carrying out and paying all legal, survey and other costs involved in the transactionJ and BE IT FURTHER RESOLVED THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 19. THE CONSUMERS' GAS COMPANY -Request for Permanent Easement, City of North York A staff communication was presented advising that a request has been received from The Consumers' Gas Company to provide a permanent easement for gas pipe- lines located on the west side of Islington Avenue, north of Finch Avenue. The proposed easement affects Authority-owned land known as Parts of Lot 21, Concession VII, W.Y.S., City of North York, The Municipality of Metropolitan TOronto. Res. #223 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A permanent easement be granted to The Consumers' Gas Company, required for gas pipelines located on the west side of Islington Avenue, north of Finch Avenue. Said easement is shown as Parts 1, 2 and 3 on Plan 64R-65l5. Authority-owned land affected is Parts of Lot 21, COncession VII, W.Y.S., City of North York, The Municipality of Metropolitan TOron to. Said easement to be granted fo~ the nominal consideration of $2.00 subject to The Consumers' Gas Company being responsible for carrying out and paying all legal, survey and other costs involved in the transaction: and BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effeqt thereto. CARRIED, 20. TOWN OF MARKHAM -Former D. & T. MacIver Property A staff communication was presented advising that in accordance with Resolution #372/78 of the Executive Committee, the staff has had several discussions with officials of the Town of Markham regarding placing the former D. & T. MacIver property under management agreement with the TOwn. The Authority has recently been advised that the Town is now in a position to enter into a suitable manageme~t agreement with the Authority for the use of this property. Res. '224 Moved by: M.J. Breen Seconded by: Mrs. J .A. Gardner RESOLVED THAT: The Administrator, Property and Administration, be directed to arrange ,for the preparation, of a suitable agreement covering the use of certain Authority-owned lands in the Markham area known as the former MacIver property, for maintenance and development purposes, by the Town of Markham. Said lands being All of Lots 29 to 39 inclusive, Block "M", Registered Plan l73, Town of Markham, The Regional Municipality of York, and THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect t~ereto, including the obtain- ing of necessary approvals and the execution of any documents. CARRIED, B-182 -lO- 21. INTERIM WATER & RELATED LAND ~~NAGEMENT ~ROJECT 1979-l981: DUFFIN CREEK WATERSHED COMPONENT -Property: E.D. &'G.H. Neville & L.E. Wilton Res. #225 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Report (June 6, 1979) set forth herein, received from the Property Administrator, be adopted and that the secretary-Treasurer be authorized and directed to complete the purchase. CARRIED, "Re: Project: Interim Water & Related Land Management Project 1979-l98l - Flood Plain & Valley Land Acquisition Component: Duffin Creek Watershed Au thori ty: Executive Resolution No.133, Meeting No.4 - April l2, 1978 and Authority Resolution No.51, Meeting No.3 - April 2l, 1978 Subject Property: South side of Main Street West owners: E.D. & G.H. Neville and L.E. W~lton Area to be Acquired: 0.246 acres, more or less Recommended Purchase Price: $l62,000.00 in full for all claims for lands and businesses, plus Vendors' legal and appraisal costs. -Included in the requirements for the above-noted project is an irreqular- shaped parcel of land, being All of Lot 4, Registered Plan 858 and Part of Lot 35, Concession IX, Town of Whitchurch-Stouffville, having a total front- age of approximately 69 feet on the south side of Main Street, west of Market Street in the downtown section of Stouffville. -Situate on the property is a single-storey, detached, masonry building and a 11:1 storey frame, insulbrick-clad building used for commercial purposes. -Negotiations have been conducted with the owners and their solicitor, Mr. D.C. Hindson, of the legal firm Cattanach, Hindson, Sutton & Hall, 52 Main Street North, Markham, Ontario, L3P lXS and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $162,000.00 in full for all claims for lands and businesses, plus Vendors' legal and appraisal costs~ with date of completing the purchase to be as soon as possible. -I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. -An application has been made to the Minister of Natural Resources for an Inspection Certificate." 22. M.T.R.C.A. -and- HENDON ESTATES LIMITED -Exchange of Lands A staff communication was presented advising that negotiations have been con- ducted over the past several months with officials of Hendon Estates Limited concerning the'acquisition of a small par~el of land required by the Authority from a commercial property fronting on the north side of Main Street in Stouffville for construction of the Stouffville Channel. Res. 1226 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Hendon Estates Limited convey to the Authority a small parcel of vacant land containing 0.037 acres, more or less, being Part of Lot 5, Registered Plan 70, TOwn of Whitchurc'h-Stouffville, in exchange for a parcel of Authority-owned land containing 0.025 acres,' more or less, being Part of ~t 5, Registered ,Plan 70, Town of Whitchurch-Stouffville. The exchange is to be for the nominal consideration of $2.00, with the Authority to be -11- B-183 responsible for payment of all legal, survey and other costs involved in completing the transaction; and THAT .said exchange be subject to an Order-in-Council being issued in accord- ance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended; AND FURTHER THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED, 23. THE MINISTRY OF GOVERNMENT SERVICES -Request f?r Conveyance of Authority- owned land: Town of vaughan A staff communication was presented advising that a request has been received from the Ministry of Government Services for a parcel of ,Authority- owned land situate in the Humber River valley between Kipling and Islington Avenues. The lands are required for the construction of new Ontario Hydro 500KV tower lines and ultimately the new Highway #407. Res. #227 Moved by: M.J. lJreen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A parcel of Authority-owned land, containing 84.666 acres, be conveyed to the Ministry of Government Services. Said land being shown as Parts l7, 18, 19 and 20 on Plan 856-27L prepared by the Ministry of Government Services, being Part of Lots l, 2 and 3, Concession VII, Town of Vaughan, The Regional Municipality of York, consideration to be the sum of $432,000.00, plus all legal, survey, appraisal and other costs involved in completing the transactionJ and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended, AND FURTHER THAT: The appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 24. EXTRA FLOOD LINE PLOTTING - DON RIVER WATERSHED -Change Order U A staff report was presented advising that it has been found necessary to extend the flood line plotting in certain areas of the Don River in order to cover all areas felt to be of importance with regard to flood sensitivity. Minor readjustments are also required in the presentation of the flood lines to facilitate checking of these flood lines and to obtain better correlation between the results of this contract and those of the already completed contracts. The following change order has been received in this regard: Change Order fl R.V. Anderson Associates Limited - $3,327.91 - representing an increase in the initial contract by $3,327.9l To extend the flood line plotting in certain areas of the Don River and to undertake minor readjustments in the presentation format for the, flood lines in order 'to account for all areas of flood sensitivity and obtain a better correlation between contracts. Res. '228 Moved by: Dr. T.H. Leith Seconded by: J.S. Scott RESOLVED THAT: Extra Work Order #1 to the contract for the flood line plotting of the Don River by R.V. Anderson Associates Limited, in the amount of $3,327.91, be approved. CARRIED, B-184 -l2- 25. WATERFRONT PROJECT 1977-1981: SCARBOROUGH SECTOR -Bluffers Park - Parking Areas A staff communication was presented advising that tenders have been received for the grading and paving of the large parking area adjacent to the launching ramps at the above location, and for the extension of the existing parking lots in Phase I, as follows: Disher Farrand Limited $171,288.00 Miller Paving Limited 182,252.00 D. Crupi & Sons Limited 202,000.00 Repac Construction Limited 203,000.00 DOminion Paving Limited 211,973.36 Warren Bithulithic Limited 223,923.00 York Paving Asphalt & Concrete 275,000.00 The Toronto Harbour Commissioners, as agents for the Authority, prepared the designs and called for tenders. The Toronto Harbour Commissioners have reviewed the tenders and have submitted a report recommending the award of the contract to the low bidder, Disher Farrand Limited. Res. #229 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The contract for grading and paving of parking areas at Bluffers Park be awarded to Disher Farrand Limited, in the amount of $l71,288.00, subject to the approval of the Ministry of Natural Resources. CARRIED~ 26. BRAMPTON DIVERSION CHANNEL - MAJOR MAINTENANCE -Quotation: Chain Link Fencing A staff communication was presented advising that six tenders have been received (of six invitations) for the supply and placement of approximately 1,572 lineal feet of six-foot high chain link fence adjacent to the Brampton Diversion Channel: F. Powell & Company Limited $12,499.00 FST included Roma Fence Limited ll,254.00 FST included Frost Steel & Wire Company Limited ll,372.00 FST included Hutt Fence Limited l2,803.00 FST included Res. 4230 Moved by: C.F. Kline Seconded by: E.V. Kolb RESOLVED THAT: The quotation received from Roma Fence Limited for the supply and placing of l,572 lineal feet of chain link fence, in the sum of $11,254.00, plus P.S.T., be accepted, it being the lowest quotation received. CARRIED: 27. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l EROSION CONTROL AND SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF DURHAM -Proposed Remedial Work: #l6 Elizabeth Street & vicinity, Town of Ajax (Duffin Creek Watershed) A staff report was presented advising that as outlined in the staff report "Erosion Control and Bank Stabilization in the Regions of Peel, York and Durham, approved by the Executive Committee at Meeting #l5/78, remedial work is proposed at the rear of #l6 Elizabeth Street and vicinity, Town of Ajax. Res. ,23l Moved by: Mrs. S. Martin Seconded by: J.S. Scott RESOLVED THAT: Erosion control work be carried out at the rear of ,l6 Elizabeth Street and vicinity, Duffin Creek watershed, Town of Ajax, at an estimated cost of $l9,800.00~ and THAT the approval of the Ministry of Natural Resources be requested: AND FURTHER THAT the benefiting property owners be required to contribute the portion of their land on which the proposed work will be carried out. CARRIED: -l3- B-l85 28. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l EROSION CONTROL & SLOPE STABILIZATION IN THE REGIONAL MUNICIPALITY OF PEEL -Proposed Remedial Work: #l38 King Street, Village of Bolton, Town of Caledon (Humber River Watershed) A staff communication was presented advising that as outlined in the staff report "Erosion Control and Bank Stabilization in the Regions of Peel, York and Durham", approved by the Executive Committee at Meeting #15/78, remedial work is proposed at the rear of il38 King Street, Town of Caledon. Res..#232 Moved by: E.V. Kolb Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Erosion control work be carried out at the rear of tl38 King Street, Humber Rive~ watershed, Town of Caledon, at an estimated cost of $18,700.00: and THAT the approval of the Ministry of Natural Resources be requested; AND FURTHER THAT the benefiting property owner be requ~red to pay an amount of $l,800.00. CARRIED; 29. CANADA-ONTARIO FLOOD DAMAGE REDUCTION PROGRAMME A staff report was presented having regard to a Flood Damage Reduction Programme initiated by the Federal government. The objectives of this programme are to reduce damage and to prevent loss of life due to flooding. Res. #233 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: The Authority approve its participation in the canada- Ontario Flood Damage Reduction Programme: and THAT The Metropolitan Toronto and Region Conservation Authority request the approval of The Municipality of Metropolitan Toronto, The Regional Municipalities of Peel, York and Durham, a~d the Townships of Mono and Adjala of the terms of the Federal/Provincial Flood Damage Reduction Programme agreement. CARRIED, 30. REPORT 11/79 - TENDER OPENING SUB-COMMITTEE -Buildings and Structures: Humber Bay East Waterfront Area The Report of the Tender Opening Sub-Committee was presented. Res. 1234 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Report '1/79 of the Tender Opening Sub-Committee be received and appended as Schedule nB" of these Minutes; and THAT the firm of M.A. Butt be retained to undertake construction of buildings and structures at the Humber Bay East Waterfront Area at a cost of $780,7ll.00, as recommended by the consultants, Johnson Sustronk Weinstein' Associates Limited. CARRIED: 31. KORTRIGHT CENTRE FOR CONSERVATION -Quota~ion for Cash Registers A staff communication was presented advising that the following quot,tions have been received for two cash registers for the Kortright Centre for Conservation to serve the merchandise-admission area and the food service area: Company Price for 1 unit Price for 2 units Comments N C R $1,417.75 $2,835.50 4 Departments Sweda 1,495.00 2,840.00 6-8 Departments I.B.M. $4,000 - $6,000 More complex - 100 Departments B-186 -14- These cash registers are included in the 1979 Authority Budget Estimates and have been approved for wintario grant in the list of furnishings, equipment and exhibits for the Kortright Centre for Conservation. Res. '235 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received 'from Sweda Sales Register Systems for the supply of two cash registers for the Kortright Centre for Conservation, in the sum of $2,840.00, be accepted1 this being the most suitable machine for the purpose required. CARRIED, 32. KORTRIGHT CENTRE FOR CONSERVATION -Quotation #79-32 - Asphalt Paving A' staff communication was presented advising that the following quotation has been received (from 3 invitations) for asphalt work at the Kortright Centre for Conservation: King City Paving Company $13.00 sq. yd. Res. '236 Moved by: E.V. Kolb Seconded by: Mrs. J .A. Gardner RESOLVED THAT: The quotation received from King City Paving Company for asphalt paving at the Kortright Centre for Conservation, at $l3.00 per square yard, or an estimated amount of $9,lOO.00, be accepted. CARRIED r 33. ICORTRIGHT CENTRE FOR CONSERVATION -Quotation #79-33 - Timber Steps A staff communication was presented advising that the following quotation has been received (from 3 invitations) for the supply and installation of timber steps at the Kortright Centre for Conservation: Leslie L. Solty & Sons Limited $2,800.00 Res. '237 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received from Leslie L. Solty & Sons Limited for the supply and installation of timber steps at the Kortright Centre for Conservation, in the sum of $2,800.00, be accepted. CARRIED; 34. BLACK CREEK PIONEER VILLAGE -Quotation - Walkaround Brochure A staff communication was presented advising that the following quotations have been received for the web offset printing, folding and supply of 100,000 copies of the Black Creek Pioneer Village Walkaround Brochure: Web Offset Publications Limited $1,490.00 Paul Brewster 1,600.00 I~land Press 2,590.00 Res. 1238 Moved by: E.V. Kolb Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation of Web Offset publications Limited for the offset printing, folding and supply of 100,000 copies of the Black Creek Pioneer Village Walkaround Brochure, in the sum of $1,490.00, plus $175.00 for typesetting, plus Federal and Provincial Sales Taxes, be accepted, it being the ,lowest quotation received. ,CARRIED; HEW BUSINESS 35. REPORT OF THE RECOGNITION SUB-COMMITTEE ~s. Gardner presented a report and recommendation of the Recognition Sub- Committee. Res. '239 Moved by: Mrs. J .A. Gardner Seconded by: M.W.H. Biggar RESOLVED THAT: The customary Garden Party at which awards have been made in the past, be held on Thursday, July 5, 1979, at the Black Creek Pioneer -15- B-l87 Village, in the form of a Strawberry Social, and that the day be named "The Bill Davidson Day" in honour of Mr. W.C. Davidson, Q.C., who will be the recipient of the gold award for 20 years' service to the Authority, and in special recognition of his services and exceedingly generous donation to The Metropolitan Toronto and Region Conservation Foundation; and THAT the Garden Party take the form of a luncheon with strawberries, and following, a tour of the most recently opened buildin~s at the Village; ANI? FURTHER THAT the invitation emphasize "The Bill Davidson Day". CARRIED: 36. UTILITY EASEMENTS Res. 11240 Moved by: M.W.H. Biggar Seconded by: Mrs. F. Gell RESOLVED THAT: The staff be directed to prepare a report for the Executive Committee which will review the present position whereby the Authority exempts certain utilities from paying a fee for easements granted in connection with laying utility lines on Authority property. CARRIED: 37. GLASSCO PARK -Painting of Buildings The C1aiJ:man of the Farm Sub-Ccmni. ttee subni tted a verbal report on t,he proposed painting of buildings at the Glassco Farm and requested the con- sideration of the Executive Committee. Res. #241 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The quotation of Marshall Floyd for the painting of sides and roofs of buildings and fences in the Glassco Park, in the amount of $2,979.lS, be accepted; and THAT the staff be authorized to spend a total amount not to exceed $3,500.00 on said painting and other improvements. CARRIED; 38. EXECUTIVE SECRETARY TO THE CHAIRMAN OF THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION A discussion took place with respect to the employment of an Executive Secretary for the Chairman of The Metropolitan Toronto and Region Conservation Foundation. Res. '242 Moved by: Mrs. F. Gell Seconded by: J.S. Scott RESOLVED THAT: The Authority employ an Executive Secretary for the Chairman of The Metropolitan Toronto and Region Conservation Foundation; and THAT the Foundation be authorized to make the appointment. THE MOTION WAS-------------------~------------------------------NOT CARRIED: 39. THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Donation to On behalf of the Chairman of The Metropolitan Toronto and Region Conservation Foundation, Mrs. Gardner advised that the Foundation is in receipt of a donation in the amount of $2,000.00 from Imperial Oil Limited for the Kortright Centre for Conservation. 40. EXECUTIVE COMMITTEE -Calling of Meeting The Secretary-Treasurer was directed to call a meeting of the Executive , B-188 -16- ,Committee for Wednesday, June 27, 1979, commencing at 10:00 a.m. at the Authority office~ 41. ADJOURNMENT On Motion, the Meeting adjourned at 1:50 p.m. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer 8-189 SCHEDULE A .., TO: The Chairman and Members of the Finance Sub-Committee, M.T.R.C.A. Meeting #3/79 - Thursday, June 7, 1979 FROM: Director of Planning and Policy RE: A PRIORITY RATING SYSTEM FOR ~HE PREPARATION OF TH~ 1980 BUDGET An adoption of the ~ero based budgetting system was introduced for the preparation of the 1979 budget. It is proposed to continue this system for the preparation of the 1980 budget. The experience gained in 1979 showed that some modification would be useful, and would enable a consistent approach to tailoring the budget to the funds available. , . These modifications are as follows: 1) State at the outset the objectives of the Authority for the budget year, as the basis for establishin~ priorities. 2) Employ a matrix analysis system which will enable rating of ,activity priorities within program or project components. This will replace the analysis of the effect of , decreases in budget allocations. OBJECTIVES OF THE AUTHORITY FOR THE BUDGET YEAR 1980 The Mandate and Role statement prepared for conservation authorities establishes two principal objectives for the Authority. (1) "each conservation authority shall study and investigate the watershed and prepare and file with its member municipalities and the Ministry of Natural Resources, a watershed plan." (2) -to develop and implement a program of water and related land management to prevent loss of life and minimize property damage from flooding and erosion in the area over which they have jurisdiction consistent with social, economic and environmental considerations." Priority will be given to established programs, projects, and activities which contribute directly to these objectives, and for which funding or specific commitment exists. In addition, priority will be given to meeting all legal obligations, and fixed costs where no reasonable alternative exists relating to the programs of the Authority. . , The Role and Mandate statement identifies ancillary resource management programs. 1) Identify and conserve those natural resources of regional significance within the area over which they have jurisdiction. 2) Manage lands acquired for the purpose of achieving their objects to produce ancillary resource and recreation benefits compatible with the purpose for which the lands were acquired and consistent with local and provincial demands and priorities. 3) Enter into agreements with appropriate agencies to assume additional water, recreation or resource management responsibilities consistent with local and provincial priorities. Ancillary priority will be given to meeting these objectives. Information and Education programs which do not fall wi thin subsequent categorie,s (second and third priorities) will be considered as falling within the ancillary priorities. Excepting where an existing agreement, commitment or fixed cost extending beyond the current year exists second priority will be given to extendi~g or establish- ing new programs which contribute to priority objectives. Third priority will be given to establishing new programs which contribute to ancillary priority objectives. MATRIX ANALYSIS OF PROGRAM OR PROJECT COMPONENTS Within each program or project the components should be rated using a matrix. There are a number of criteria which can be applied. The following is a suggested order of priority. This may require adjustment depending on the B-190 Finance Sub-Committee Meeting '3/79 A Priority Rating system for the preparation of the 1980 audget paqe 2 program or project. 1) Minimum administration and operation costs required to operate the component, excepting those charged to administration, 2} Studies and design required to implement scheduled works or activityr 3} Scheduled works or activity (sub criteria deqree of objectives "achieved, cost = revenues): 4} Studies and design required to complete programme or project preparation; 51 Land Acquisition - commitments _ required for scheduled works _ flood plain and valley - headwaters, 61 Completion of long term base studies: 71 Continuing long term base studies, 8} Initiating long term base studies. The first draft of the budget is to be prepared by each Division during the ~nth of June for assembly during July and August in preparation to go to the Advisory Boards, as scheduled, in September. In the drafts of the budget prepared by the Divisions, the salary and wage components should be included at 1979 levels. Adjustments will be made for any increases that may be recommended for 1980 following direction from the Personnel Sub-Committee. It is anticipated that the Personnel Sub-Committee would meet in August, 1979. 1979.06.06. WAM/JIlIIl B-19l SCHEDULE "B" THE METROPOLITAN TORONTO AND REGION CONSJRVATION AUTHORITY REPORT 11/79 of the TENDER OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive, Downsview on Friday, June 8, 1979, commencing at 2:00 p.m. to open tenders for Buildings and Structures, Humber Bay East Waterfront Area. PRESENT WERE Chairman R.G. H~nderson Vice Chairman Mrs. F. Gell Chairman, Humber Valley Advisory Board t-trs. J. A. Gardner Johnson Sustronk weinstein & Assoc. Ltd. H. Sustronk Consulting Engineers Staff W.A. McLea1\ M.R. Garrett B.E. Denney The Committee was advised that 3l sets of documents were taken out by contractors and six tenders were received, as follows: Contractor Total Tender M.A. Butt $ 780,711.00 Trist Construction Limited 791,303.00 Ha~ovic Construction Limited 821,118.00 D.A. Campbell-Disher Farrand 953,388.40 Lisgar Construction 1,014,488.65 A.G.A. Construction Limited 1,056,724.00 IT WAS AGREED AND THE COMMITTEE RECOMMENDS: THAT 'all' tenders received for Buildings and Structures - Humber Bay East Waterfront Area be referred to the consultants, Johnson Sustronk weinstein & Associates Limited, for their review and report"with recommendations to the Executive Committee meeting to be held on Wednesday, June 13, 1979. R.G. Henderson W .A. McLean, DUector of Planninq & POlicy Chairman Acting Secretary-Treasurer 1979.06.12 /XC. ~ B-192 , the metropolitan toronto and region conservation authority minutes Report '9/79 EXECUTIVE COMMITTEE WEDNESDAY-JUNE-27-l979 19/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, June 27, 1979, commencing at lO:OO a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biqgar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance' Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & Policy Mrs. A.C. Deans Development co~ordinator, Planning & policy J . W. MaleUch HEARIN GS: , FOllowing the Roll Call, the meeting recessed to hold Hearings reI (1) Town of Caledon' Village of Bolton Humber River Watershed ( 2) Samuel Sarick Limited City of Mississauga Mimico Creek Watershed Miss L. Trivelli recorded the proceedings of the Hearings. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mn. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith J.S. Scott Secretary-Treasurer K.G. Higgs Adm. - Information & Education Division T.E. Barber Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Admin~stration Division W.E. Jones Research Planner, Planning & policy Mrs. A.C. Dean~ Development Co-ordinator. Planning & Policy J.W. Maletich B-l93 -2- ABSENT WAS Member Mrs. S. Martin MINUTES The Minutes of Meeting #8/79 were presented. Res. '243 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The Minutes of Meeting 18/79, as presented, be adopted as if read. CARRIED; SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY. SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 1. REPORT 12/79 - OFFICIAL OPENING SUB-COMMITTEE -Kortright Centre for Conservation Report 12/79 of the Official Opening Sub-Committee - Kortright Centre for Conservation was presented. Res. '244 Moved by: Dr. T.H. Leith Seconded by: E.H. Card RESOLVED THAT: Report #2/79 of the Official Opening Sub-Committee - Kortright Centre for Conservation, as presented, be received. CARRIEDJ 2. REPORT OF JOINT MEETING OF FINANCE AND PERSONNEL SUB-COMMITTEES The staff presented a report of a joint meeting of the Finance and Personnel Sub-Committees held June l8, 1979. Res. '245 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The report of the joint meeting of the Finance and Personnel Sub-Committees, held June l8, 1979, as amended and appended' as Schedule "A" of these Minutes, be received. CARRIEDJ 3. ONTARIO REGULATION 845/77 AS AMENDED: CONSERVATION AREAS - METROPOLITAN TORONTO AND REGION -Appointment of Enforcement Officers A staff communication was presented advising that investigation and evaluation of the appointment of part-time staff members as Enforcement Officers at the Indian Line and Albion Hills camp grounds has been undertaken in accordance with Resolution 1140 of Executive Committee Meeting 16/79. Res. 1246 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: Mr. Wallace Wand, Supervisor of the Albion Hills Campground, and Mr. Arthur Southin, Supervisor of the Indian Line Campground, be appointed officers to enforce Ontario RegUlation 845/77 as amended, made under The Conservation Authorities Act. CARRIED, -3- B-l94 4. DECISION OF HEARING Town of Caledon Village ~f Bolton Humber River Watershed Res. 1247 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 27th day of June, 1979: and TlmT the application of The Corporation of the TOwn of Caledon, in accordance with Ontario Regulation 735/73 for permission to reconstruct the First Bolton Scout Hut on the land of Dick's Dam Park in Bolton, on Part of Lot 9, Concession 6, Village of Bolton, Town of Caledon (Humber River Watershed), be refused for the following reasons: -The proposed structure would be situated within the flood plain of the Humber River as defined by the Regional Storm: -The proposed structure would interfere with the control of flooding; On a recorded vote - voting "YEA" 7 Voting "NAY" 4 R.G. Henderson Mrs. L. Hancey Mrs. F. Gell C.F. Kline M.W.H. Biggar E.V. Kolb M.J. Breen J.S. Scott E.H. Card Mrs. J.A. Gardner Dr. T.H. Leith CARRIED; 5. DECISION OF HEARING Samuel Sarick Limited City of Mississauga Mimico Creek Watershed Res. 1248 Moved by: M.W.H. Biggar Seconded by: M.J. Breen BE IT RESOLVED THAT: This Executive Committee confirm the decision of ,the Hearing held this 27th day of June, 1979, and THAT the application of Samuel Sarick Limited, in accordance with Ontario Regulation 735/73, for pe~ission to construct an addition to an existing office building in an area which is regulated by this Authority on Block -E", Plan 919, City of Mississauga (Mimico Creek watershed), be approved, subject to: -The applicant revising his drawings wherein no openings to the new building shall be lower than the regional elevation of 164.2 (metric) : -All existing excavated material being remov~d from the site; -The revised drawings as recommended forming part of the permit, -Every effort being made to minimize silting of the creek during construction. CARRIED, 6. GLEN HAFFY CONSERVATION AREA -Refreshment Booth Operation A staff communication was presented advising that the contract for the food concession at Glen Haffy Conservation Area was awarded to Mr. James E. Maguire for the 1979 season. The Authority has been advised that Mr. Maguire is selling his house and his Airport Road food facility to a Mr. Lawrence J. Rooney, who is interested in undertaking operation of the facility at Glen Haffy Conservation Area at the end of June, 1979. B-l95 -4- Res. 1249 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The contract for the food service concession in the Glen Haffy Conservation Area for the 1979 season be transferred from Mr. James E. Maguire to Mr. Lawrence J. Rooney, effective June 27, 1979, and THAT Mr. Rooney keep exact costs of his operation during this period, maintain competitive prices for his product and operate the booth on weekends, holidays and on other occasions in consultation with the Superintendent of the Area when the public is utilizing this Area, and forward to the Authority proof of liability insurance coverage and Workmen's Compensation coverage, if required. CARRIED; 7. FINANCIAL REPORT AND ACCOUNTS -May, 1979 Mr. Scott presented the Financial Report and Accounts for the month of May, 1979. Res. 1250 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: The Financial Statement for the month of May, 1979, be received: and that payment of the Authority accounts, in the amount of $844,445.52, being (a) Current Expenditures - Wages and Salaries $3l9,l85.72, Materials and Supplies $l39,254.49: (b) Capital Expenditures - Wages and Salaries $3l,044.0lJ Materials and Supplies $349,332.46: (c) Other Programs - Wages and Salaries $5,621.24: Materials and Supplies $7.60, be approved. CARRIED, 8. REPORT 12/79 - HISTORICAL SITES ADVISORY BOARD Report 12/79 of the Historical Sites Advisory Board was presented. Res. 125l Moved by: J.S. Scott Seconded by: Mrs. J. A. Gardner RESOLVED THAT: ,Report 12/79 of the Historical Sites Advisory Board be received, and THAT Recommendation is of Report 12/79 of the Historical Sites Advisory Board, as contained therein and set forth herein, be not approved: '5 At least two, and preferably three, members of the Historical Sites Advisory Board be appointed members of the Black Creek Pioneer Village Visitor Centre Building Sub-Committee. CARRIED, Res. 1252 Moved by: M.W.H. Biggar Seconded by: Dr. T.H. Leith RESOLVED THAT: Recommendations Il, 12, 13 and '4, as contained therein, and as amended and set forth herein, be adopted: tl The Restoration Programme at the Black Creek Pioneer Village continue in order to complete the followin~ facilities: .Richmond Hill Manse . Sawmill .Sawyer's House .Cooper's Shop E Consideration be given to extending the northern boundary of the Black Creek Pioneer Village property to the C.N. Railway line to include the property with the house, which is within the Village periOd, should the property beco~e available. f3 Should the valley lands south of Shoreham Drive to Finch Avenue be transferred to Metropolitan Toronto for management under the Authority's agreement, the development of the lands be for passive recreation uses only: and -5- B-l9b THAT the transfer be subject to Metropolitan Toronto agreeing to adequately maintain and supervise the area under the Authority's agreement: and further THAT the right of access from Black Creek Pioneer Village to the Indian Village Site be retained and that the Indian Village Site be preserved for future study and development. !! In the long-term planning for the Black Creek Pioneer Village, that consideration be given to converting the Dalziel area to a stock barn and farm7 and THAT the pioneer agricultural artifacts presently located in the Dalziel area be retained and properly displayed in that area. CARRIED; 9. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Kitchen Equipment A staff communication was presented advising that the following quotations have been received for the supply, delivery and set-up of kitchen equipment for the Lake St. George Conservation Field Centre: Kitchen Equipment Restaurant Range - 4 burner 36" griddle - 2 ovens Super Fryer Soiled Dish-Tabling/Drainboard Pre-rinse Sink - Faucet Slanted Dish Rack Shelf Dishwasher: Blakeslee Model Booster: Blakeslee Model Steam Exhaust Hood Clean Dish Tabling (Pot Sink) Refrigerated Display Case 24ft utility Unit Steam Table Tublar Tray Sheet Tray Cart (2 section) Quotation Hercules Kitchen Equipment $16,134.00 J & F Distributors $13,658.00 (payaent within 7 days) LeBlanco Kitchen Equipment $15,497.00 Res. 1253 Moved by: Mrs. F. Gell Seconded by: E.H. Card RESOLVED THAT: The quotation received from J & F Distributors for the supply, delivery and set-up of kitchen equipment for the Lake St. George Conservation Field Centre, be accepted7 it being the lowest quotation received. CARRIED, 10. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Agreement A staff communication was presented having regard to a proposed agreement between The Metropolitan Toronto and Region Conservation Authority and The Metropolitan Toronto School Boards, the Metropolitan Separate School Board and the York County Board of Education for the establishment and operation of the Lake St. George Conservation Field Centre. Res. '254 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell RESOLVED THAT: The agreement between The Metropolitan Toronto and Region Conservation Authority and the Metropolitan Toronto School Boards, the Metropolitan Separate School Board and the York County Board of Education, to establish and operate the Lake St. George Conservation Field Centre, be approved 7 and THAT the appropriate Authority officials be authorized and directed to sign the necessary document to give effect thereto. CARRIED, B-l97 -6- 11. REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO A staff communication was presented advising that a communication has been received from The Honourable James A.C. Auld, Minister of Natural Resources with reference to the Report of the Working Group on the Mandate and Role of the Conservation Authorities of Ontario. Staff has reviewed and compared this document to previous drafts and Authority recommendations in this connection (Executive Resolution #44l/78). The present document has been revised in order to recognize all of the concerns of the Authority. Res. 1255 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: The communication from The Honourable James A.C. Auld, Minister of Natural Resources and the Report of the working Group on the Mandate and Role of the Conservation Authorities of Ontario be received and the communication from the Minister, under date of May 3l, 1979, be appended as Schedule "B" of these Minutes: and THAT copies of the Minister's letter and the Report be circulated to the Authority's member municipalities for comment by August 15, 1979~ AND FURTHER THAT following receipt of municipal comments, staff be directed to prepare a report and recommendations for consideration by the Executive Committee. CARRIED; 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Monarch Construction Limi ted . To construct a storm sewer outfall into the Bruce Creek, a tributary of the Rouge River, just east of Kennedy Road, south of l6th Avenue, Town of Markham. A staff communication was presented advising that an application has been received for permission to construct a storm sewer outfall at the above location. Res. 1256 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of Monarch Construction Limited, be received: and THAT the application of Monarch Construction Limited for a permit to undertake the construction of a storm sewer outfall into the Bruce Creek, a tributary of the Rouge River, in the area just east of Kennedy Road, south of 16th Avenue in the Town of Markham (The Regional Municipality of York), Rouge River water- shed, be approved, subject to: (a) All gabion works being preceded by a filter mat or a 6"-12" layer of crushed stone: (b) All areas disturbed due to construction beUng restored to the satisfaction of the Authority and of the Town of Markham. CARRIED; 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mrs. Linda McCarty To construct an addition to residence on Lot 4, Plan 976, Town of Caledon (Humber River Watershed) A staff communication was presented advising that an application has been received for permission to construct an addition to the residence at the above location. Res. 1257 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The application of Mrs. L. McCarty, together with the staff communication, be received: and THAT the application of Mrs. L. McCarty for permission to construct an addi tion to the kitchen of her residence on Lot 4, Plan 976, Town of Caledon -7- B-198 ' (Humber River watershed), be approved, subject to: (a) The applicant undertaking flood damage reduction measures to the addition to provide protection to the regional flood level: (b) The applicant complying with all municipal by-laws and regulations. CARRIED, l4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Borough of Etobicoke To undertake restoration works on the eroding banks of the Renforth Creek as it flows through Bloordale and Neilson Parks, from Bloor Street south to Markland Wood Golf Club (Etobicoke Creek Watershed) A staff communication was presented advising that an application has been received for a permit to undertake remedial works at the above location. Res. i 258 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of the Borough of Etobicoke, be received: and THAT the application of the Borough of Etobicoke for a permit to undertake restoration works on the eroding banks of the Renforth Creek, as it flows through Bloordale and Neilson Parks in the area from Bloor Street South to Markland Wood Golf Club, Borough of Etobicoke (Etobicoke Creek watershed), be approved, subject to: (a) The ends of all gabion walls being keyed into the banks: (b) Every effort being made to reduce silting of the creek during construction, (c) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED, 15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. Philip Epstein TO construct an in-ground swimming pool at rear of 126 Beardmore Crescent, Lot l5, Plan M-l280, City of North York (Don River Watershed) A staff communication was presented advising that an application has been received for a permit to construct an in-ground swimming pool at the above location. Res. 1259 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of Mr. Philip Epstein, be received: and THAT the application of Mr. Philip Epstein for permission to construct an in- ground swimming pool at the rear of 126 Beardmore Crescent, on Lot 15, Plan M-1280, City of North York (Don River watershed), be approved, subject to: (a) All excavated material surplus to the site being removed from the site, (b) All structures associated with the swimming pool being located near to or abutting the existing dwelling: (c) All efforts being made to avoid silting of the Don River during con- struction: (d) All work being done to the satisfaction of the Authority and of the City of North York. CARRIED, B-l99 -8- 16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mrs. Edna Lisus To cons~ruct an in-ground swimming pool at rear of 120 Knightswood Road, Lot 3l & Pt. Lot 32, Plan 3464, City of North York (Don River Watershed) A staff communication was presented advising that an application has been received for permission to construct an in-ground swimming pool at the above location. Res. '260 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of Mrs. Edna Lisus, be received: and THAT the application of Mrs. Edna Lisus for permission to construct an in- ground swimming pool at the rear of #20 Knightswood Road, City of North York (Don River watershed), be approved, subject to: (a) All excavated material surplus to the site being remQved from the site: (b) All structures associated with the swimming pool being located near to or abutting the existing dwelling: (c) All efforts being made to avoid silting of the Don River during construction: (d) All work being done to the satisfaction of the Authority and of the City of North York. CARRIED: 17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. John R. Finlay To construct an in-ground swimming pool at rear of 16 St. Margaret's Drive, City of North York (Don River Watershed) A staff communication was presented advising that an application has been received from Mr. John R. Finlay for permission to construct an in-qround swimming pool at the above location. Res. '261 Moved by: Mrs. L. Hancey .Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the application of Mr. John R. Finlay, be received: and THAT the application of Mr. John R. Finlay for permission to construct an in- ground swimming pool at the rear of '6 St. Margaret's Drive, City of North York (Don River watershed), be approved, subject to: (a) All excavated material surplus to the site being removed from the site: (b) All structures associated with the swimming pool being located near to or abutting the existing dwelling; (c) All efforts being made to avoid silting of the Don River during con- struction: (d) All work being done to the satisfaction of the Authority and of the City of North York. CARRIJ!lD; l8. CITY OF NORTH YORK -Request for Reconveyance of Land A staff communication was presented advising that a request has been received from the City of North York for reconveyance of a small strip of land which was conveyed to the Authority on May 27, 1968, together with several other parcels located in the Black Creek valley. The Authority land affected contains 0.04 acres, being composed of lane between Lots 273 and 274, Registered Plan 4439, City of North York. Said land is part of a larger acreage acquired from the City of North York under Project P.8.A for the nominal consideration of $2.00. -9- B-200 Res. #262 Moved by: M.W.H. Biggar Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A parcel of Authority-owned land, containing 0.04 acres, more or less, be reconveyed to the City of North York. Said land being composed of lane between Lots 273 and 274, Registered Plan 4439, City of North York, The Municipality of Metropolitan Toronto. Consideration to be the nominal sum of $2.00, plus all legal, survey and other costs involved in completing the transaction: and THAT said conveyance be subject to an Order-in-Council being issued in accord- ance with Section 20 (c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended: AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any docwnents. CARRIED; 19. DISPOSAL OF SURPLUS AUTHORITY- OWNED LAND: CITY OF BRAMPTON. A staff communication was presented advising that on September 29, 1964, the Authority acquired lOO.527 acres of land from W. & E. Inch. The lands acquired included flood plain and valley lands, table lands required for the Claireville Dam and Reservoir project, and additional table land fo~ing part of the owners' holdings. The Ministry of Transportation and Communications, on April 30, 1971, acquired 1.696 acres of the above-mentioned property for the reconstruction of Highway '7 and the Ninth Line, leaving a small, isolated parcel of Authority-owned table land containing 0.409 acres separated from the remainder of the Authority's holdings. The Authority has recently received an inquiry from an adjacent owner regarding a possible purchase of a portion of the subject property. The Conservation Land Management Division, the Water Resource Division and the Director of Planning and Policy have reviewed this location in relation to the Authority's land requirements, and recommend that the isolated parcel of Authority-owned land situate on the east side of the Ninth Line, and a further 30-acre table land portion of the former W. & E. Inch property fronting on the west side of the Ninth Line be considered as surplus to the requirements of the Authority and that these lands be publicly advertised for sale. Res. '263 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff communication having regard to the disposal of two parcels of table land, being parts of the former W. & E. Inch property, con- sisting of 0.409 acres, more or less, situate on the east side of the Ninth Line, and a 30-acre, more or less, parcel fronting on the west side of the Ninth Line, being Parts of Lot 4, Concession IX (N.D.), City of Brampton, be received: and THAT consideration of this matter be deferred tb the next regular meeting of the Executive Committee scheduled for Wednesday, July 11, 1979. CARRIED, NEW BUSINESS 20. FIRST BOLTON SCOUT HUT, VILLAGE OF BOLTON, TOWN OF CALEDON The Executive Committee considered the request of the Town of Caledon for permission to remove from the lands of the Bolton Community Conservation Centre (Dick's Dam Park) the debris of the First Bolton Scout Hut, which was destroyed by fire in 1978. Res. '264 Moved by: Mrs. F. Gell Seconded by: Dr. T.H. Leith RESOLVED THAT: The request of the Town of Caledon for permission to remove from the lands of the Bolton Community Conservation Centre (Dick's Dam Park) the debris of the first Bolton Scout Hut, which was destroyed by fire in 1978, be approved. CARRIED, B-20l -lQ- 21. BLACK CREEK PIONEER VILLAGE -Visi to:!: Centre Res. 1265 Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: The Chairman of The Metropolitan Toronto and Region Conservation Foundation be authorised to make a presentation to The Devonian Group of Charitable Foundations for financial support for the construction of the Black Creek pioneer Village Visitor Centre, as designed by Raymond Moriyama. CARRIED; 22. ADJOURNMENT On Motion, the Meeting adjourned at 1:00 p.m. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer B-202 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY JOINT MEETING FINANCE AND PERSONNEL SUB-COMMITTEES The Finance and Personnel Sub-Committees met in joint session at the Authority Of fice , 5 Shoreham Drive, Downsview, Ontario on Monday, June l8, 1979, commenc- ing at l:30 p.m. PRESENT WERE Chairman J.S. Scott Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner C.F. Kline Mrs. 'S. Martin Authority Chairman R.G. Henderson Authority Vice Chairman Mrs. F. Gell Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean THE FOLLOWING ITEMS WERE DISCUSSED: 1). Proposed Management Study Review (Resolution 1210/79 of the Executive Committee) : 2). Appointment of a Management Study Review Sub-Committee; The Meeting recessed to discuss the proposed Management Study Review. The Meeting reconvened at 4:00 p.m. IT WAS AGREED THAT the undermentioned firms be advised of the adoption of Resolution i2l0 of Executive Committee Meeting #8/79, as follows: nRESOLVED THAT: Rather than consider a proposal to have a study made on a data processinq evaluation and considering the financial restrictions being imposed by the Province, Metropolitan Toronto and the respective regional muni~ipalities, a Management Consultant be engaged to make a complete study of the operations of The Metropolitan Toronto and Region Conservation Authority, and that the scope and parameters be established by the Finance Sub-Committee, and THAT the cost of this study be financed first by the funds that would have been provided for the data processing evaluation and the balance on a deficit basis, AND FURTHER THAT the Finance Sub-Committee interview Management Consultants and receive presentations with the object in view of submitting to the Executive Committee, at the earliest possible time, recommendations out- lining the terms of reference for the management study and recommending the hiring of a Management COnsultant as selected by the sub-committee, AND FURTHER THAT the members of the Personnel Sub-Committee be invited to participate in these discussions and recommendations." The Canada Consulting Group Currie, Coopers & Lybrand Limi ted T.A. Croil Associates Limited Harry Damp & Associates Drake Executive Ernst & Ernst Chartered Accountants Hickling & Johnston Limited IBI Group Josef Kates Associates Inc. Peat Marwick & Partners B-203 -2- Price Waterhouse Associates P.S. Ross & Partners Stevenson & Kellogg Thorne Riddell Associates Limited AND FURTHER THAT they be requested to advise the Authority, by July 6, 1979, of their credentials for the undertaking of such a study and of their interest in undertaking the proposed study, and of their willingness to submit a formal proposal to the Authority at a later dateJ AND FURTHER THAT the Committees suggest that the following areas be considered. 1) . Staff organization and structure; 2) . Operations' management; 3) . Human resourceSJ 4) . Finance and controlJ 5) . Systems and procedures. 1'1' WAS AGREED AND THE COMMITTEE RECOMMENDS THAT: '1'he Executive Committee appoint a Management Study Review Sub-Committee; and THAT the members of the committee be the members of the Personnel and Finance Sub-Committees; AND FURTHER THAT The Chairman of the Finance Sub-Committee be the Chairman of the Management Study Review Sub-Committee: AND FURTHER THAT The Municipality of Metropolitan TOronto be added to the list of consultants who are invited to submit a proposal to the Management Study Review Sub-Committee. J.S. Scott K.G. Higgs Chairman, Finance Sub-Committee Secretary-Treasurer KC. 1979.06.18 B-204 ~~~ SCHEDULE "B" {$} LETTER SENT TO ALL CONSERVATION AUTHORITIES CHAIR}1EN bee Secretary-Treasurers ...~~ Onlano omu 01 the Ministry of [M~@~~Wrn[ID 416/965-1301 Whitney Block Minister Natural Queen's Park Resources JUN 15 1919 Toronto Ontario M, T, R. C. A. May 31, 1979 Dear 1 am pleased to forward to you a copy of the Report of the Working Group on the Mandate and Role of the Conservation Authorities of Ontario. As you are aware, the preparation of this report was undertaken in response to concerns expressed by municipalities, various ministries of government and the Conservation Authorities themselves, regarding the future structure and direction of the Conservation Authorities' program. In light of these concerns my predecessor, the Honourable Frank S. Miller, in conjunction with the Executive Committee of the Chairmen's Committee of Ontario Conservation Authorities, agreed to establish a working group to review the programs of the Conservation Authorities, to clarify their role in watershed management and to develop a sound policy framework to guide future program development. The recommendations of this working group are outlined in the enclosed report. Since implementation of these recommendations could have a far reaching effect on the nature of resource management in the province, 1 want to be assured that all interested parties have an opportunity to input to the review of this document. As a result, the report is being circulated to all Conservation Authorities, all ministries of the provincial government, municipal organizations and other interested groups for review and commen to Based upon this review my ministry will prepare recommendations to the Cabinet regarding the mandate and role of the Conservation Authorities. 1 am particularly concerned that each Conservation Authority and its member municipalities thoroughly review the report and provide me with their comments. In this regard, 1 would request that each Conservation Authority provide copies of the report to its member municipalities, review the recommendations with the municipalities and ensure that municipal concerns and comments are included in the Authority's response to the document. Staff of the Ministry of Natural Resources will be available to assist the Authorities, if required. . . ./2 B-20S -2- May 31. 1979 After discussion with the Executive Committee of the Chairmen's Committee of Ontario Conservation Authorities, it was agreed that responses should be forwarded to Mr. R. J. Burgar, Director, Conservation Authorities Branch within (60) days of receipt of the report. I know that you will agree with me that the Report of the Working Group on the Mandate and Role of Conservation Authorities provides a useful basis for discussion of the future responsibilities of the Conservation Authorities and I trust that you will take the opportunity to provide us with your views on these important recommen~ations. With personal regards. Yours sincerely. ~~.~ ~ ames A. C. Auld Encl. ~ B-206 , the metropolitan toronto and region conservation authority minutes Report nO/79 EXECUTIVE COMMITTEE WEDNESDAY-JULY-ll-l979 nO/79 The Executive Committee met at the Caledon home of Mr. M. J. Breen on wednesday, July 11, 1979, commencing at lO:OO a.m. PRESENT WERE Vice-Chairman Mrs. F. Cell Members M.J. Breen E.H. Card R. Fitzpatrick Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin F.R. Perkins J.S. Scott Secretary-Treasurer K.G. Higgs Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Water Resource D~vision M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Admir.~stration Division W.E. Jones Research Planner, Planning & policy Mrs. A.C. Deans Head, Waterfront Section, WRD B.E. Denney Head, Information Section, I&ED P.A. Head Development Coordinator, Planning & Policy J.W. MaleUch Senior Administrative Secretary Mrs. M. Mitchell Senior Secretary - Finance Division Mrs. W. Robertson ABSENT WERE Chairman R.G. Henderson Members M.W.H. Biggar Mrs. J.A. Gardner MINUTES The Minutes of Meeting #9/79 were presented. Res. #266 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Minutes of Meeting #9/79, as presented, be adopted as if read. CARRIED J SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 1. QUOTATION #79-3l -Fu,el Oil Supply A staff communication was' presented advising that the following quotation B-207 -2- had been received from Texaco Canada Incorporated for the supply and delivery of fuel oil as required during the 1979-80 heating season: CUR R E N T POSTED PRICE PER NET PRICE PER VOLUME DISCOUNT LOCATION GALLON GALLON PER GALLON Black Creek, Boyd, Bruce's Mill $0.639 $0.549 $0.09 Claireville, Heart Lake $0.639 $0.589 $0.05 All other locations $0.648 $0.598 $0.05 The quoted net prl.ce is subject to any future increases in the posted tank wagon price. Res. #267 Moved by: E.V. Kolb Seconded by: R. Fitzpatrick RESOLVED THAT: The quotation received from Texaco Canada Incorporated for the supply and delivery of fuel oil to the Authority facilities at the net price of $0.549 per gallon for Black Creek, Boyd and Bruce's Mill, $0.589 per gallon for Claireville and Heart Lake, and $0.598 per gallon for all other locations, subject to future increases in the posted tank wagon price, be accepted. CARRIED; 2. 1979 BUDGET REVISIONS CONSERVATION & RECREATION LAND MANAGEMENT - CONSERVATION AREAS (DEVELOPMENT) A staff communication was presented advising that an evaluation of various projects identified in the previously adopted budget of the A~thority has resulted in a reallocation of the funds provided for facility development in conservation areas. These reallocations will not affect the total funding requirements for the 1979 Conservation Area Development Program. Res. #268 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: The 1979 Budget Revisions for the reallocation of funding for the Conservation and Recreation Land Management - Conservation Area Development program, as appended as Schedule "A" of these Minutes, be approved. CARRIED, 3. PROPOSED SPECIAL PROJECT - Stream Enhancement A staff communication regarding a proposed agreement with the Ontario Ministry of Natural Resources for special funding for stream enhancement work was presented. Res. #269 Moved by: C.F. Kline Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication regarding a proposed agreement with the Ontario Ministry of Natural Resources for special funding for stream enhancement work be received: and THAT the proposed stream enhancement work be considered a special project of the Authority, with the total funding being provided by the Ministry of Natural Resources; and FURTHER THAT the staff be directed to 'prepare a suitable agreement with the Province of Ontario and that the appropriate Authority officers be authorized to sign the necessary documents. CARRIED: B-208 -3- 4. C.O.E.O. CONFERENCE AND RESIDENTIAL WORKSHOP SEPTEMBER 26-28, 1979, TAWINGO OUTDOOR CENTRE -Attendance at Res. 1270 Moved by: E.V Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: Messrs. Terry Carr, Ron Hudson, Andy Wickens, Miss Jean Wansbrough and Miss Brenda Wright, be authorized to attend the C.O.E.O. Conference and Residential Workshop at the Tawingo Outdoor Centre, in Huntsville, Ontario, September 26 - 28, 1979 and that their estimated expenses in the amount of $50.00 each, plus travelling costs, be paid. CARRIED, s. DISPOSAL OF SURPLUS AUTHORITY- OWNED LANDS: CITY OF BRAMPTON A staff communication was presented advising that on September 29, 1964, the Authority acquired lOO.527 acres from W. and E. Inch. The lands acquired included flood plain and valley lands, tablelands required for the Claireville Dam and Reservoir project, and additional tableland forming part of the owners' holdings. The Ministry of Transportation and Communications on April 30, 1971, acquired l.696 acres of the above mentioned property for the reconstruc- tion of Highway #7 and the Ninth Line, leaving a small, isolated parcel of Authority-owned tableland containing 0.409 acres separated from the remainder of the Authority's holdings. The Authority has recently received an inquiry from an adjacent owner regarding a possible purchase of a portion of the subject property. The Conservation Land Management Division, the Water Resource Division and the Director of Planning and policy have reviewed this location in relation to the Authority'S land requirements, and recommend that the isolated parcel of Authority-owned land situate on the east side of the Ninth Line, and a further 30-acre tableland portion of the former W. & E. Inch property fronting on the west side of the Ninth Line be considered as surplus to the requirements of the Authority and that these lands be publicly advertised for sale. Res. '271 Moved by: Mrs. S. Martin Seconded by: J.S. Scott RESOLVED THAT: Two parcels of tableland being Parts of the former W. and E. Inch property consisting of an isolated parcel containing 0.409 acres, more or less, situate on the east side of the Ninth Line, and a 30-acre, more or less, parcel fronting on the west side of the Ninth Line be considered as surplus to the requirements of the Authority. Said lands being Parts of Lot 4, Concession IX, (Northern Division) City of Brampton, formerly Township of Toronto Gore, Regional Municipality of Peel, and; THAT the availability of these parcels of surplus lands be circulated to the various Provincial Ministries, The Regional Municipality of Peel and the City of Brampton to determine whether they have any interest in acquiring these lands at market value and failing which: THAT the Secretary-Treasurer be directed to advertise these lands for sale by public tender, andJ FURTHER THAT The Chairman and Vice-Chairman of the Authority and the Chairman of the Flood Control and Water Conservation Advisory Board be appointed a committee to open the tenders and report to the Executive Committee with a recommendation. CARRIEDr 6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 HIGHLAND CREEK WATERSHED COMPONENT - PROPERTY: CEDAR HEIGHTS CONSTRUCTION LIMITED Res. #212 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: The Report (June 28, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be B-209 -4- authorized and directed to complete the purchase. CARRIED; aRe: Project: Interim Water and Related Land Management project 1979-l98l - Flood Plain and Valley Land Acquisition Component - Highland Creek Watershed Authority: Executive Resolution No. l33, Meeting No. 4 - April l2, 1978 and Authority Resolution No. 5l, Meeting No. 3 - April 2l, 1978 Subject Property: East side of Centennial Road Owner: Cedar Heights Construction Ltd. Area to be Acquired: l.450 acres, more or less Recommended Purchase Price: $6,000.00 plus Vendor's legal costs. "Included in the requirements for the above noted project is an irregular shaped parcel of land being all of Block "A", Registered Plan 8652, Borough of Scarborough, Municipality of Metropolitan Toronto, located on the east side of Centennial Road, south of Lawrence Avenue East. "Negotiations have been conducted with Officials of Cedar Heights Construction Ltd. and their solicitor Mr. Sidney Freedman, 500l Duf ferin Street, Thornhill, Ontario, L4J 2K2, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price.~s follows: The purchase price is to be the sum of $6,000.00 plus Vendor's legal costs with date of completing the purchase to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidential to the closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free f~om encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 7. REQUEST FROM THE MUNICIPALITY OF METROPOLITAN TORONTO FOR A RELIEF TRUNK SEWER EASEMENT A staff communication was presented advising that a request had been received from The MQnicipality of Metropolitan Toronto to provide a permanent easement for a Relief Trunk Sewer required in the Massey Creek Valley, west of Kennedy Road, south of Eglinton Avenue. Res. t273 Moved by: J.S. Scott Seconded by: F.R. Perkins RESOLVED THAT: A permanent easement be granted to The Municipality of Metropolitan Toronto, required for construc~ion of a Relief Trunk sewer, in the Massey Creek Valley, west of Kennedy Road, south of Eglinton Avenue. Said easement is shown as Parts 3, 7 and 8, Plan 64R-2l22. The Au~ority- owned land affected is Part of Lot 29, Concession 'C', Borough of Scar- borough, Municipality of Metropolitan Toronto. Said easement to be granted for the nominal consideration of $2.00, subject to The Municipality of Metropolitan Toronto being responsible for carrying out and paying all legal, survey and other costs involved in the transaction, and: FURTHER THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED, 8. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l ROUGE RIVER WATERSHED COMPONENT - PROPERTY: J.D. McCULLOVGH Res. t274 Moved by: E.H. Card Seconded by: R. Fitzpatrick RESOLVED THAT: The Report (June 25, 1979) set forth herein, received from B-210 -5- the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re: Project: Interim Water and Related Land Management Project 1979-l98l - Flood Plain and Valley Land Acquisition Component - Rouge River Watershed Authority: Executive Resolution No. l33, Meeting No. 4 - April l2, 1978 and Authority Resolution No. 5l, Meeting No. 3 - April 21, 1978 Subject Property: West side of Rougemount Drive OWner: J.D. McCullough Area to be Acquired: 0.200 acres, more or less Purchase Price: $7,000.00 plus Vendor's legal costs. "Included in the requirements for the above noted project is an irregular shaped parcel of land being Part of Lots 55, 56 and 57, Registered Plan 283, Town of Pickering, Regional Municipality of Durham, being a partial taking from the rear of a larger residential property fronting on the west side of Rougemount Drive in the lower Rouge Area. "Negotiations have been conducted with the owner and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price as follows: The purchase price is to be $7,000.00 plus Vendor's legal costs, with the purchase to be finalized and the funds paid over during 1980. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidential to the Closing, for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 9. REQUEST FROM THE TOWN OF VAUGHAN - Storm Sewer Easement A staff communication was presented advising that a request had been received from the Town of Vaughan, to provide a permanent easement for a Storm Sewer required east of Keele Street, south of Langstaff Sideroad. Res. #275 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: A permanent easement be granted to the Town of Vaughan, required for construction of a Storm Sewer, east of Keele Street, south of Langstaff Sideroad. Said easement is shown as Part 1 on Plan 66R-l0870. The Authority-owned land affected is Part of Block "A", Plan M-l80l, Town of Vaughan, Regional Municipality of York. Said easement to be granted for the nominal consideration of $2.00 subject to the Town of Vaughan being responsible for carrying out and paying all legal, survey and other costs involved in the transaction, and; FURTHER THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIE.D' 10. FLOOD PLAIN MAPPING COVERAGE A staff communication was presented discussing the extent of the Authority's current mapping prog~am and clarifying the Authority's ability to review plan proposals within areas not being mapped. Res. #276 Moved by: Mrs. S. Martin Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff report on Flood Plain Mapping Coverage be received., CARRIED, B-211 -6- 11. WATERFRONT PROJECT 1977-l98l ADDITIONAL FUNDING -Shoreline Management The Executive Committee discussed letters from Mr. P.J. Yakabuski, Parliamentary Assistant to the Minister of Natural Resources, regarding the representation of the City of Toronto and the Borough of Scarborough regarding additional funding for The Metropolitan Toronto and Region Waterfront Project 1977-l98l. Res. 1277 Moved by: Mrs. S. Martin . Seconded by: Mrs. L. Hancey RESOLVED THAT: The responses from the Ministry of Natural Resources respecting shoreline management be received and sent to the City of Toronto, the Borough of Scarborough and The Municipality of Metropolitan Toronto. CARRIEDr l2. AQUATIC PARK: RESOLUTION OF MAIN ISSUES The staff submitted a report and recommendations regarding Aquatic Park: Resolution of Main Issues. Res. #278 Moved by: M. J.. Breen Seconded by: Dr. T.R. Leith RESOLVED THAT: The staff report regarding Aquatic Park: Resolution of Main Issues be received and appended as Schedule liB" of these Minutes, and the recommendations set forth herein be adopted. CARRIED; l3. WATERFRONT PROJECT 1977-l98l HUMBER BAY EAST WATERFRONT AREA - Buildings and Structures Contract Change Order #1 A staff communication was presented advising that the Authority was in receipt of correspondence from the Authority's consultant, Johnson Sustronk Weinstein and Associates Limited, requesting approval of Change Order #1 to the above noted contract. Res. 1279 Moved by: M.J. Breen Seconded by: E.V. Kolb RESOLVED THAT: Change Order II involving a decrease in the contract value of $l6,788.35 be approved subject to the approval of the Province of Ontario. CARRIED: 14. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO _ Proposed Slope Instability Monitoring Program - Nos. 9 to 11 Sulkara Court, City of North York, Don River Watershed A staff report and supporting correspondence from consultants were presented with regard to a slope instability problem at the above location. Res. #280 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates, Consulting Geotechnical Engineers, to help carry out a slope instability monitoring program at the rear of Nos. 9 to II Sulkara Court, City of North York, Don River Watershed, at a cost estimated to be $3,000.00, and THAT the approval of the Ministry of Natural Resources be requested. CARRIED; l5. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO - proposed Engineering Study - No. 55 Wynford Heights vicinity, City of North York, Don River Watershed A staff report was presented advising that as outlined in the staff report "Erosion Control and Bank Stabilization in Metropolitan Toronto - 1979 Programme" approved by the Executive Committee at Meeting Il5/78, remedial ~~~~ is proposed to be carried out at No. 55 Wynford Heights vicinity in B-212 -7- Res. #28l Moved by: Dr. T.H. Leith Seconded ~y: F.R. Perkins RESOLVED THAT: The staff be authorized to retain the firm of Andrew Brodie Associates Inc., Consulting Engineers, to carry out an engineering study to determine the extent and causes of the erosion problem at No. 55 Wynford Heights vicinity, in the City of North York, Don River Watershed, at a cost estimated to be $4,900.00: and THAT the Ministry of Natural Resources be requested to approve this study. CARRIED, l6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l EROSION CONTROL AND SLOPE STABILIZATION IN METROPOLITAN TORONTO _ Engineering Design Services - Slope Instability at Nos. 9l-ll5 Weir Crescent and vicinity, Borough of Scarborough, Highland Creek Watershed A staff report was presented advising that as outl~ned in the staff report "Erosion Control and Bank Stabilization in Metropolitan Toronto - 1979 Programme" which was approved by the Executive Committee at Meeting 115/78, remedial work is proposed to be carried out at Nos. 9l-ll5 Weir Crescent in 1980. Res. 1282 Moved by: Mrs. L. Hancey Seconded by: Mrs. S. Martin RESOLVED THAT: The staff be authorized to retain the firm of Peto MacCallum Ltd., Consulting Engineers, to provide engineering design services for slOpe stabilization at Nos. 9l-llS Weir Crescent and vicinity, in the Borough of Scarborough, Highland Creek Watershed, at a cost estimated to be $lO,250.00, and THAT the Ministry of Natural Resources be requested to approve this study. CARRIED; NEW BUSINESS 17. REPORT '2/79 - TENDER OPENING SUB-COMMITTEE - Duffin Creek Channel Improvements Town of Whitchurch-Stouffville Duffin Creek Watershed The Report of the Tender Opening Sub-Committee was presented. Res. '283 Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: Report 12/79 of the Tender Opening Sub-Committee be received and appended as Schedule "C" of these Minutes: and THAT the Authority construct the Whitchurch-Stouffville Channel Improvements in one phase in 1979, and, ACCORDINGLY,the contract for this work be awarded to the'lowe~t proper tender, Disher-Farrand Limited in the amount of $526,468.00. ", CARRIED, l8. FRENCHMAN'S BAY WATER AND SHORELINE PLANNING STUDY -Town of Pickering A staff communication was presented advising that the Authority was in receipt of the aforementioned study from the Town of Pickering requesting Authority comments by the end of July. The Authority's Master Plan for the Bay was considered by the Town of Pickering and only the south-west corner of Frenchman's Bay was approved. Res. '284 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff report having regard to the Frenchman's Bay Water and Shoreline Planning Study - Town of Pickering be received: and B-2l3 -8- THAT the staff report be approved and forwarded to the Town of pickering, and~ FURTHER THAT the report be considered by the Waterfront Advisory Board at its next meeting. CARRIED, 19. NATIONAL MARINE EDUCATION ASSOCIATION CONFERENCE - Attendance At Res. #285 Moved by: F.R. Perkins Seconded by: R. Fitzpatrick RESOLVED THAT: Mrs. J.A. Gardner and one staff member, if desirable, be authorized to attend the National Marine Education Association Conference, at the University of Milwaukee, Wisconsin, August l6, l7 and l8, 1979 and that their estimated expenses in the amount of $350.00 each be paid. CARRIED, 20. APPOINTMENT OF SECRETARY Res. 1286 Moved by: M.J. Breen Seconded by: J.S. Scott RESOLVED THAT: The Authority engage a secretary at Classification Level 4 for The Metropolitan Toronto and Region Conservation Foundation. CARRIED : 21. Members of the Executive Committee and the staff conveyed their sincere appreciation to Mr. and Mrs. Breen for their hospitality on this occasion. 22. ADJOURNMENT On Motion, the Meeting adjourned at 11:55 a.m., July 11. Mrs. F. Gell K.G. Higgs Vice-Chairman Secretary-Treasurer 1 9 7 9 BUD GET REV I S ION S PAGE: 35 PROGRAM: Conservation & ReCJ:eation Land Managenent -Q:mservation Areas (Developnent) (Cl) DATE: Wednesday, July 11th, 1979. PURPOSE: To realign fundinq to reflect projected a:mstructi.on oosts and to provide st:ru::tures that will increase services to Calservation Area visitors and increase operatiala.l efficiency. 1979 OB.J'Ea'IVES: To develop facilities to penni.t increased attendance and enhance user experiences and :reduce operational oosts. ~: '1hi.s is a shared pmqram, SO\ of the funds being available fran the Province of <k1tario and the balance being funded fran the General levy 00 all participating municipalities. FINJ\NCIAL ~: Total fundinq remains the same. CllJECl'IVE CU\SSIFICATIaS: Materials Salaries Supplies & IIea1 Services Financial & Wages Utilities Equiptlmt Property & Rents Ta2lE!S Expenses ~ $ $ $ $ $ $ $ $ l7,340 63,560 3,SOO - 42,100 - - 126,500 en 0 = to2 t:I C t; 111 I . N )0 .... = ... lJl I - , ..., .... 1 9 7 9 BUDGET REV I S ION S U'I PAGE: ~ ROGRAM: ~ICN & mx:REATICN LAND ~ - a:mERVATICN AREAS (rf.VEU)PMENl') (Cl) DATE: Wednesdav. Julv 11th. 1979 o RIG I N A L BUD GET REV I SED BUDGET I Sources of Financing Sources of Financing Net Provincial ~lunicipal Net Provincial Municipal ACT I V I T Y Expenditures Grant Levy Other Expenditures Grant Levy Other Albion Hills 43,600 2l,800 2l,800 - 40,400 20,200 20,200 Black Creek l,OOO 500 500 - l,OOO 500 500 Bruce's Mill l2,500 6,250 6,250 - 8,600 4, 300 4, ~OO Clairevi1le - - - - 3,300 l,650 1,650 Cold Creek 29,000 l4,500 l4 , 500 - 38,000 19 , 000 19 ,000 Gl~n Haffy 8,500 4,250 4,250 - 8,500 4,250 4,250 Greenwood 3,200 l,600 l,600 - 3,200, l,600 1,600 Heart Lake 7,000 3,500 3,500 - 5,500 2,750 2,750 Petticoat Creek 8,000 4,000 4,000 - 8,000 4,000 4,000 Studies 7,500 3,750 3,750 - lO,OOO 5,000 5,000 General Development 6,200 3, lOO 3, lOO - - - - ; TOTAL l26,500 63,250 63,250 l26,500 63,250 63,250 B-216 SCHEDULE liB" To: Executive Committee, M.T.R.C.A. #10/79 From: M. R. Garrett, Administrator, Water Resource Division Re: AQUATIC PARK: RESOLUTION 9F MAIN ISSUES BACKGROUND At its meeting #6/76, the Authority adopted the following recommendations of its Waterfront Advisory Board: "The Master Plan for Aquatic Park be approved in principle and forwarded to The Province of ontario for approval; THAT The Province of Ontario jointly with The Municipality of Metropolitan Toronto designate The Metropolitan Toronto and Region Conservation Authority as the implementing agency for Aquatic Park; and SUBJECT TO THE APPROVAL OF THE PROVINCE OF ONTARIO: THAT the development of Aquatic Park be funded as part of the Metropolitan Toronto and Region Waterfront project 1977-l98l; THAT the staff be directed to prepare an implementation plan, taking into consideration the comments of all interested agencies for Aquatic Park which sets out those items of development which can reasonably be included within the Waterfront project 1977-l98l, and their phasing, and those items which can be funded by other levels of Government and other agencies, including the private sector; THAT in accordance with the direction of the Ministry of Natural Resources and The Municipality of Metropolitan Toronto; the Toronto Harbour commissioners be requested to assume responsibility for the armouring of the outer shoreline, and that the Authority support the Toronto Harbour Commissioners in any submission for funding to The Government of Canada in this connection; THAT the Authority obtain, for a nominal sum, those land and water areas required for the development and operation of the Park; THAT the Authority place the park lands under the existing agreement with The Municipality of Metropolitan Toronto for management and operation; and further THAT The Municipality of Metropolitan Toronto enter into such tri-party agreements as may be necessary for the management of specific elements within the Park." The Plan was then circulated to Metropolitan Toronto for their. comment and approval. Metropolitan Toronto sent the Plan to the City of Toronto Planning Board for their comments;' these were considered along with those from other interested groups, and on May 3, 1977, the Council of the Muni'cipality of Metropolitan Toronto adopted the following recommendations of their Parks Committee: B-217 To: Executive Committee #10/79 Re: Aquatic Park: Resolution of Main Issues PAGE 2 al. Metropolitan Toronto now recognize the Master Plan for Aquatic Park prepared by The Metropolitan Toronto and Region Conservation Authority as an appropriate conceptual aspect of the Metropolitan Waterfront Plan; 2. Metropolitan Toronto now join with The Metropolitan Toronto and Region Conservation Authority in discussions with the Province of Ontario to determine: (a) the disposition of the water lots in and adjacent to the area in question; (b) the degree of financial involvement of the Province in future development of the area; (c) the designation of The Metropolitan Toronto and Region Conservation Authority as the implementing agency for development work, and Metropolitan Toronto as an eventual "benefiting municipality", and (d) that title to the land mass be secured by The Metropolitan Toronto and Region Conservation Authority at nominal cost to the corporation; 3. Metropolitan Toronto join with The Metropolitan Toronto and Region Conservation Authority and the Toronto Harbour Commissioners in discussions with the Federal Government with respect to that government or its designated agency providing shore protection to the south shoreline of Aquatic Park at no cost to the Metropolitan Corporation; 4. The City of Toronto be requested to secure a public roadway to the site prior to any development proceeding; 5. Until the foregoing negotiations are concluded, that Metropolitan Toronto not involve itself financially in any aspect of development or operation; 6. Following resolution of the foregoing, that the development of Aquatic Park be phased as an integral part of Waterfront Development within the financial guidelines established from time to time by the Metropolitan Council; 7. In the context of such Waterfront Development, The Metropolitan Toronto and Region Conservation Authority be requested to prepare a phased implementation plan related to the consultants' Master Plan for approval by Metropolitan Toronto and the City of Toronto prior to any work related to detailed implementation proceeding, II ........... Subsequently, the Plan was sent to the Province of Ontario for their comment and approval. On July 4, 1977, The Ministry of Natural Resources responded with approval in principle and designating the Authority as "interim ~plementing agency." Subsequently, on January 24, 1978, the Authority received another letter from the Minister containing Cabinet approval of the Plan and indicating that: n...... title of the lands and waters required for this Park be transferred to the Authority as soon as the matter of armouring the external shoreline by the Federal Government is resolved." S" 218 To: Ex~cutive Committee #10/79 Re: A~atic Park: Resolution of Main Issues PAGE 3 During the interval since approval, another issue has been raised: alleviating the problems caused by siltation in the Keating Channel at the mouth of the Don River. This issue was the subject of a recent report to the Authority which recommended a three party cost sharing agreement for the dredging, with the proviso that the dredgeate could be accommodated in a new endiked area on the south side of Aquatic Park. The attached figure shows the location of the endikement in relation to Aquatic Park. The complexity of Aquatic Park in terms of the agencies involved, the range of uses proposed, the dredgeate disposal area and the City's central waterfront planning process "make it imperative to resolve the ownership and determine how the Park will be developed. RESOWTION OF THE ISSUES The two main issues that need to be resolved to the satisfaction of Metropolitan Toronto and The Ministry of Natural Resources are: 1. Armouring the exterior shoreline at no cost to Metropolitan Toronto or the Province of Ontario. 2. Acquisition of the land base required for the Park by the Authority at a nominal cost. After resolving these issues, the Authority, acting as implementing agency for development, will be able to take full charge of the preparation of an orderly implementation plan for the Park Which meets the desires of Metropolitan Toronto and the City, while at the same time meeting Provincial objectives respecting regional waterfront open space. The Authority has been in discussion with the Federal Government through various departments over the last two years; Fisheries and Environment, Public Works, and Transport, to determine if any funding would be available for the exterior armouring. All have indicated that the chances of obtaining the required $3.5 million are slight. Your staff, after considerable discussion with the Toronto Harbour Commissioners' st~ff have come to the conclusion that the only feasible way to satisfy the armouring requirement at no cost, is to carry out a landfill and rubble operation; realigning the shoreline to a more stable angle and armouring it with demolition rubble. The cost would be paid for by a charge levied against the contractors using the site. This process would not negate the need for land~cape armour stone to cover the rubble and to augment protection where necessary; but it would mean a significant reduction in cost. The only disadvantage with the scheme is timing; it will take ten to fifteen B-2l9 To: Executive Committee #10/79 Re: Aquatic Park: Resolution of Main Issues PAGE 4 years to complete the job, however there does not seem to be any pressing reason for accelerating the armouring at this t~e. The new endikement proposed for dredge ate disposal is on a more stable angle than the original shoreline, and will assist in the long term stabilization process. Once there is agreement at all levels that the foregoing is a reasonable basis to resolve the armouring issue; it is proposed that the Province of Ontario transfer the waterlot for Aquatic Park and the endikement to the Authority for a nominal swn. This will enable the Authority to get on with the planning and development of the Park. Certain changes have occurred since the Authority's development of a plan for the Park. Among these changes are: the dredgeate disposal area, changes in the biological community, and forthcoming policies of the City of Toronto Planning Board. The preparation of the Xmplementation Plan will have to review the original concept in the light of what has happened and develop a plan satisfactory to all government agencies to Which the Authority is responsible. OBLIGATIONS The resolution of the armouring and title issues require the co-operation of the affected parties. They do not work unless all agencies participate. In this regard, there are certain obligations: i) The Toronto Harbour Commissioners undertake the landfilling and rubble operation required to stabilize the west and south shores of the Aquatic Park and the new endikement for whatever term is reqUired, with all costs being recovered from a user charge. It is understood that the Toronto Harbour Commissioners would agree: (a) that all plans for stabilization and for the endikement require the approval of Metro Toronto and the Province of Ontario through the Authority; (b) that all normal costs associated with the landfill operation will be covered, such as: - monthly progress surveys and reports - access maintenance and traffic control - navigation markers - liaison with the Ministry of the Environment; (c) that fill will be provided at no charge to the Authority, as required on a reasonable basis for internal site development of the Park itself. B-220 To: Executive Commi~tee #10/79 Re: Aquatic Park: Resolution of Main Issues PAGE 5 ii) The Toronto Harbour Commissioners is prepared to turn over those of its lands required to accommodate a public road allowance to the Park from Leslie Street. iii) The Municipality of Metropolitan Toronto is prepared to administer the inter~ public uses at the site and take over its management when complete via the normal lease arrangement with the Authority. iv) The Province is prepared to transfer a water lot encompassing Aquatic Park and the endiked area to the Authority for nominal cost. v) The Province is prepared to transfer at a nominal cost, the waterlot encompassing the north part of the outer Harbour to the Toronto Harbour Commissioners. vi) The Authority, in accordance with established procedures for waterfront development, will prepare plans for the development of the site and circulate them for approval by Metropolitan Toronto and through it, the City of Toronto, as well as the Province of Ontario prior to carrying out development. vii) The Authority will carry out development as part of the Waterfront Plan on the basis of 50:50 cost sharing between Metropolitan Toronto, the Province of Ontario, and within the priorities for waterfront development as established by the Province of Ontario and Metropolitan Toronto through the Authority. It is clear that planning and implementing development at Aquatic Park is a complex matter. There are many complicating and inter-relating factors which will impact the Authority's involvement at this site. Not all of these ma~ters have been addressed in this report, however, the main issues which need resolution have been, and the solutions proposed are appropriate. It is important for a single agency to take control of what is happening now and What will happen at this site. It is also important that this agency reflect the desires of its contributing municipalities and the Province. The Authority is in a position to be able to perform in this matter if title is obtained. B-221 To: Executive Committee #10/79 Re: Aquatic Park: Resolution of Main Issues PAGE 6 RECOMMENDATIONS WHEREAS the Metropolitan Toronto and Region Conservation Authority has now been able to satisfy the conditions of the Province of Ontario and the Municipality of Metropolitan Toronto respecting the stabilization of the OUter Harbour shoreline and the title of Aquatic Park on the basis: 1. That the Toronto Harbour Commissioners are prepared to undertake the realignment and stabilization of the south and west shores of the OUter Harbour Headland; and further that this arrangement be formalized in a satisfactory agreement between the Authority and the Toronto Harbour Commissioners. 2. That the Municipality of Metropolitan Toronto is prepared to undertake interim management of the site during development and is prepared to operate and maintain the park, when complete, over the long term through the normal lease arrangement with the Authority. 3. That the Toronto Harbour Commissioners is prepared to provide a public right-of-way from the end of Leslie Street to the Park. IT IS RECOMMENDED THAT: The Municipality of Metropolitan Toronto and the Province of Ontario be advised that the Authority is prepared to undertake implementation planning and development of Aquatic Park and the endikement area as part of its Waterfront Development program; and THAT the Province of Ontario be requested to act on the commitment set out in the Ministry of Natural Resources' approval of Aquatic Park dated December 30, 1977 and transfer title of the lands and waters required for this Park to the Authority for a nominal swn; and subsequently THAT the Authority enter into a ten year lease with the Toronto Harbour Commissioners for the dredgeate disposal areas and endikement area, renewable until the project is complete and stabilization has been achieved to the satisfaction of the Authority as laid down in the agreement; AND FURTHER THAT the Province of Ontario be requested to transfer the waterlot enclosing the ship channels and the north portion of the OUter Harbour to the Toronto Harbour Commissioners for a nominal swn in accordance with the request contained in the Toronto Harbour Commissioners' letter dated December 29, 1976 that "prior to any further development taking place, the Commissioners insist that the allocation of waterlots between the Toronto Harbour Commissioners for Port purposes and the Authority for recreation purposes be agreed upon and completed. II Attachment: 1979.06.29 MRG/md INNER HARBOUR SHIP CHANNEL TORONTO ISLANDS rr:::~:n: :I AREA ,., lIE TRAIISRIllIID Lj. .. -l:I I'l1011 _NCZ 10 IITRCA ......~ FI:;'::~:}J AREA ,., IE TRANSfE....ED ,_ PIIOVINCE 10 THC rrrriT1. AREA ,., IE LEASED t;.L!1.! jj ,., THe BY IITReA ......... SIlDIlEUNE 10 IE ITA.UZED IY lIIC ~ , the metropolitan toronto end region conservation euthority 100 ACRES AQUATIC PARK IOAC 7\ RESOLUTION OF TITLE AND ARMOURINO ISSUES blI I JUNE 1979 .., N N B-223 SCHEDULE "c" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY REPORT #2/79 of the TENDER OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive, Downsview on Wednesday, July 4, 1979, commencing at 2:00 p.m., to consider tenders for Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville, Duffin Creek Watershed. PRESENT WERE Chairman R. G. Henderson Vice-Chairman Mrs. F. Gell Chairman, R.D.H.P. Advisory Board Mrs. S. 'Martin Chairman, Flood Control & Water Conservation Advisory Board J. S. Scott Kilborn Limi ted Consulting Engineers N. H. Beesley Staff K. G. Higgs M. R. Garrett J. C. Mather The Committee was advised that twenty sets of documents were taken out by contractors and seven tenders received, as follows: Contractor Total Tender Toronto Zenith Contracting Ltd. $540,090.00 Disher-Farrand Limited $548,480.00 Tacc Construction Co. Limited $60l,750.00 Elirpa Construction & Materials Ltd. $658,711.04 Lamco Construction Ltd. $695,665.00 G. C. Romano Sons (Toronto) Limited $717,125.00 Meca Mechanical Industries Limited $730,625.12 IT WAS AGREED, AND THE COMMITTEE RECOMMENDS THAT: All tenders received for Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville, Duffin Creek Watershed, be referred to the Consultants, Kilborn Limited, for their review and report, with recommendations to the Executive Committee Meeting to be held on Wednesday, July 11, 1979. R. G. Henderson K. G. Hiqqs Chairman Secretary-treasurer July 10, 1979 JCM/md C\.. B-224 , the metropolitan toronto and region conservation authority minutes Report '11/79 EXECUTIVE COMMITTEE WEDNESDAY-JULY-25-l979 '11/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, July 25, 1979, commencing at 10:00 a.m. PRESENT FOR HEARING (1) Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.~.H. Biggar M.J. Breen E.H. Card Mrs. J .A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. A. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. "McLean Adm. - Information & Education T.E. Barber Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Research Planner, Planning & Policy Mrs. A.C. Deans Development Co-ordinator, Planning & Policy J.W. Maletich PRESENT FOR HEARING (2) Chairman R. Grant Henderson Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. A. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education T.E. Barber Adm. - Water Resource Division M.R. Garrett Adm. - Finanqe Division A.D. Harris Research Planner, Planning & policy Mrs. A.C. Deans Development Co-ordinator, Planning & Policy J .W. Maletich HEARINGS Following the Roll Call, the meeting recessed to hold Hearings re: (l) Mr. J.C. Enns -on behalf of- Mr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.) City of Brampton Etobicoke Creek Watershed. (2) M.M. Dillon Limited -on behalf of- Runnymede Development Corporation Limited City of Mississauga Etobicoke Creek Watershed Miss L. Trivelli recorded the proceedings of the Hearings. B-225 -2- PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W .A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & Policy Mrs. A.C. Deans Development Co-ordinator, Planning & Policy J.W. Maletich Head-Flood Control Section, WRD J .C. Mather Supervisor, Property Administration, P&AD D.J. Prince MINUTES The Minutes of Meeting 110/79 were presented. Res. #287 Moved by: E.H. Card Seconded by: Mrs. F. Gell RESOLVED THAT: The Minutes of Meeting #lQl79, as presented, be adopted as if read. CARRIED; SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF ~E AUTHORITY AND RECOMMENDS ITS ADOPTION: 1. INFORMATION & EDUCATION DIVISION -l979 Budget Revisions Operations & Maintenance - Community Relations: Information & Education Operations A staff communication was presented having regard to adjustments to the 1979 Budget for the Information & Education Division. Res. #288 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The 1979 Budget Revisions to Operations & Maintenance - Community Relations: Info~ation & Education Operations be received and appended as Schedule "A" of these Minutes, and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions to Operations and Maintenance - Community Relations: Information & Education Operations be included in the 1979 Budget Estimates of the Authority. CARR1EDI. SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING' ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: -3- B-226 2. DECISION OF HEARING -Mr. J.C. Enns -on behalf of- Mr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.) Ci ty of Brampton Eto~icoke Creek Watershed Res. '289 Moved by: J.S. Scott . Seconded by: C .F. Kline BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 25th day of July, 1979J and THAT the application of Mr. J .C. Enns on behalf of Mr. Arthur Morrison (Grace Retirement and Community Enterprises Inc.), in accordance with Ontario Regulation 735/73, for permission to construct a senior citizens' apartment building on Part of Lot 30, Brampton No.2, being the corner of Maple Street and Nelson Street in the City of Brampton (Etobicoke Creek watershed), be deferred until such time as the applicant is prepared to submit to the Authority a site concept plan in accordance with the conditions as stated in Section 6 (subsection 1) of Ontario Regulation 735/73. CARRIEDJ 3. DECISION OF HEARING -M.M. Dillon Limited -on behalf of- Runnymede Development Corporation L~ited City of Mississauga Etobicoke Creek Watershed Res. '290 Moved by: Mrs. S. Martin Seconded by: MrB. L. BaDCey BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Bearing held this 25th day of July, 1979; and THAT the application of M.M. Dillon Limited on behalf of Runnymede DevelOp- ment Corporation L~ited, in accordance with Ontario Regulation 735/73, for permission to place fill in an area as defined on the SChedules and on the flood plain of the Etobicoke Creek as defined by the Regional Storm on Lot 1, Concession I, S.D.S., City of Mississauga (Etobicoke Creek watershed), be refused for the following reasons: .That ~e placing of fill as proposed will affect the control of flooding, .That the creation of a parking lot on the flood plain of the Etobicoke Creek will affect the conservation of land. CARlUEDJ 4. REPORr '1/79 - SUB-COMMITTEE TO CONSIDER DISPOSAL OF AUTHORITY-OWNED LAND Report U/79 of the sub-committee appointed to consider disposal of surplus Authority-owned land was considered. Res. '291 Moved by: Mrs. F. Gell Seconded by: J.S. Scott RESOLVED THAT: The 53.204 acre parcel of surplus, vacant Authority-owned land, being Part of Lot 32, Concession x, Town of Vaughan (The Regional Municipality of York), being part of the former estate of George Groves' property, not be sold at this time as the offer received is less than the appraised value. CARRIEDJ 5. STAFF FINANCIAL PROGRESS REPORT -April I-June 30, 1979 ) The staff presented a Financial Progress Report for the period April 1 - JUDe 30, 1979. Res. '292 Moved by: C.F. IUine : S~conded by: Mrs. J .A. Gardner RESOLVED THAT: The Staff Financial Progress R~port for the period Apr~l 1 ~ June 30, 1979, be received and appended as Schedule -B- of theBe Minu~s. CAlUtIEDJ B-227 -4- 6. ALBION HILLS & BRUCE'S MILL CONSERVATION AREAS -Quotation #79/34: Cross Country Ski Equipment A staff communication was presented advising that the following quotations have been received for cross country ski equipment for the Albion Hills and Bruce's Mill ski programs to replace damaged, worn-out or defective equipment: SUPPLIER SKIS POLES 8OO'l'S BINDIR:;S F. Badeau Ltee. 86 pro @ $30.10 129 pro @ $6.44 20 pro @ $3.75 62 pro @ $41.71 Donleigh Sales Ltd. 57 pro @ $6.62 107 pro @ $27.93 72 pro @ $8.33 X-C Skis Int. Ltd. 72.pr. @ $5.95 62 pro @ $13.50 R. Hcrt:on & Sons Ltd. 86 pro @ $48.00 62 pro @ $68.00 Mariano Sports 148 pro @ $42.50 l29 pro @ $8.00 62 pro @ $16.00 45 pro @ $17.60 Jem E. Neimi Ltd. 57 pr. @ $3.25 62 pro @ $10.80 72 pro @ $6.75 45 pro @ $11.30 >>II Canada Ltd. 86 pro @ $43.29 62 pro @ $55.67 Rukc of Canada Ltd. 72 pro @ $5.95 l07 pro @ $16.00 Res. '293 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: The quotations of: F. Badeau Ltee for 86 pro of X-C skis at $30.10 a pair and 62 pro of X-C skis at $41.71 a pair, and 20 pro of X-C bindings at $3.75 a pair7 John E. Neimi for 62 pro of X-C boots at $10.80 a pair and 45 pro of X-C boots at $11.30 a pair, and 57 pairs of X-C poles at $3.~5 a pair7 Ruko of Canada for 72 pro of X-C poles at $5.95 a pair (total acquisition, including Federal Sales Tax, $7,041.37) for the Albion Hills and Bruce's Mill Cross Country Ski Programmes, be accepted. CARRIED, 7. FINANCIAL REPORT AND ACCOUNTS -June, 1979 Mr. Scott presented the Financial Report and Accounts for the month of June, 1979. Res. '294 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Financial Statement for the month of June, 1979, be received7 and that payment of the Authority accounts, in the amount of $1,093,360.04, being (a) Current Expenditures'- Wages and Salaries $361,765.827 Materials and Supplies $255,937.447 (b) Capital Expenditures - Wages and Salaries $31,434.897 Materials and Supplies $422,180.357 (c) Other Programs - Wages and Salaries $21,135.25; Materials and Supplies $906.29, be approved. CARRIED, 8. PROPOSED POLICIES: CO-ORDINATED PROGRAMME STRATEGY FOR THE MINISTRY OF NATURAL RESOURCES IN SOUTHERN ONTARIO A staff communication was presented advising that the Authority is in receipt of the above report and a request from the Minister of Natural Resources for comment by July 30, 1979. A staff report on this matter was considered by the Executive Committee. Res. 1295 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline -5- B-228 RESOLVED THAT: The staff report on the Proposed policies: Co-ordinated Programme Strategy for the Ministry of Natural Resources in Southern Ontario, a~ amended, be received and forwarded to the Ministry for consideration. CARRIED; 9. ADMINISTRATION OF ONTARIO REGULATION 735/73 -March/April/May/June, 1979. The staff presented a report concerning the administration of Ontario Regulation 735/73 for the period March/April/May/June, 1979. Res. 1296 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The report of the administration of Ontario Regulation 735/73 for the period March/April/May/June, 1979, be received and appended as Schedule "c" of these Minutes. CARRIED' 10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mrs. Ruth Kerbel To undertake construction of storm sewer outfall into the Wilket Creek between #74 and #76 The Bridle Path, City of North York (Don River Watershed) A staff communication was presented advising that an application has been received from Mrs. Ruth Kerbel for permission to construct a storm sewer out- fall into the wilket Creek at the above location. Res. #297 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of Mrs. Ruth Kerbel, be received~ and THAT the application of Mrs. Ruth Kerbel for a permit to undertake the con- struction of a storm sewer outfall into the Wilket Creek, in the area between Nos. 74 and 76 The Bridle Path, City of North York (Don River watershed), be approved, subject to: (a) All gab ion works being preceded by a filter mat or a 6--12" layer of crushed stone~ (b) Every effort being made to minimize silting of the creek during construction; (c) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the City of North York. CARRIED; 11 . APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Wallace P. Canivet Limited To realign minor tributary of the Humber River, Lot 13, Concession V, Town of Vaughan A staff communication was presented advising that an application has been received for permission to realign a section of a minor tributary of the Humber River at the above location. Res. 1298 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of' Wallace P. Canivet Limited, be received~ and" THAT the application of Wallace P. Canivet Limited for a permit to undertake the realignment of a minor tributary of the Humber River in the area of Lot 13, Concession V, Town of vaughan (The Regional Municipality of York) Humber River watershed, be approved, subject to: . (a) Every effort being made to minimize silting of the creek during construction; B-229 -6- (b) A filter mat or a 6"-12" layer of crushed stone preceding the rip rap work; (c) All areas disturbed due to construction being restored to the satisfaction of the Authority; (d) The Town of Vaughan Engineering Department being satisfied . with the proposed work. CARRIED; 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. A. Christie To reshape existing slope in area of #67 Riverview Heights, Borough of Etobicoke (Humber River Watershed) A staff communication was presented advising that an application has been received for permission to improve and reShape tbe bank at the above location. Res. #299 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of Mr. A. Christie, be receivedi and THAT the application of Mr. A. Christie for a permit to place fill and to rehabilitate the slope in the area of #67 Riverview Heights in the Borough of Etobicoke (The M.Jnicipality of Metropolitan Toronto) Humber River watershed, be approved, subject to: (a) rill not exceeding 2S cubic yards of material, as indicated on the proposali (b) All areas disturbed due to construction being restored to the satisfaction of the Authority and of th~ Borough of Etobicoke. CARRIE'D; 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Vaughan For remedial works on a tributary of the West Don River as it flows through Rockview Gardens, just east of Keele Street, south of Highway #7, Town of Vaughan A staff communication was presented advising that an application has been received for permission to undertake remedial works on a tributary of the West Don River at the above location. Res. '300 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of the Town of Vaughan, be receivedi and THAT the application of the Town of Vaughan for a permit to undertake remedial works on a tributary of the West Don River as it flows through Rockview Gardens in the area just east of Keele Street, south of Highway '7, Town of Vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) Rip rap being placed at both upstream and downstream ends of the proposed culverts; (b) All gabion and rip rap works being preceded by a filter mat or a 6"-12" layer of crushed stone; (c) Every effort being made to minimize silting of the river during constructioni (d) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED, -7- B-230 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 J. Weltman Investments To construct parking lot and addition to existing ware- house building, Codeco Court, City of North York (Don River Watershed) A staff communication was presented advising that an application has been received for permission to construct a parking lot and proposed addition to an existing warehouse building at the above location. Res. *301 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of J. Weltman Investments, be received~ and THAT the application of J. Weltman Investments for permission ~o construct a parking lot and an addition to an existing warehous~ building on Codeco Court, City of North York (Don River watershed), be approved, subject to: (a) The applicant-builder complying with the plans and profiles as indicated on Drawing *L-l, Job File '5150-1, as prepared by Project Planning Associates Limited and dated 10.07.l979~ (b) All surplus fill being removed from the site~ (c) Appropriate landscaping material being placed along the valley side slopes abutting the parking area; (d) Applicant complying with all existing municipal by-laws and regulations. CARRIED; l5. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. Dan O'Reilly To relocate drainage ditch on Part Lot 1, Concession IV (Albion), Town of Caledon (Humber River Watershed) A staff communication was presented advising that an application has been received from Mr. Dan O'Reilly for permission to relocate a drainage ditch from the centre to the perimeter of his property at the above location. Res. #302 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of Mr. Dan O'Reilly, be received; and THAT the application of Mr. Dan O'Reilly for the relocation of the drainage ditch on Part of Lot 1, Concession IV, Town of Caledon (The Regional Municipality of Peel), Humber River watershed, be approved, subject to: (a) The ditch being wide enough to carry the maximum flows the north end culvert can allow; , (b) The slopes of the ditch not being steeper than 2.5 to 1; (c) The di tch being sodded ~ (d) Some rip rap being placed at both culvert locations and at the south-west cprner of the property where the ditch is redirected in an easterly direction; (e) The proposed fill being graded to direct overland flow into the ditch; (f) The proposed alignment of the drainage ditch conforming to the attached plan, which forms part of the permit. CARRIED; B-231 -8- 16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Vaughan To divert New Westminster Creek, a tributary of the West Don River, at a point approximately 1,000 metres north of Highway #7, Town of VaugQan A staff communication was presented advising that an application has been received from the Town of Vaughan for permission to divert a tributary of the West Don River at the above location. Res. 1303 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff communication, together with the application of the Town of Vaughan, be receivedJ and THAT the application of the Town of Vaughan for a permit to divert the New Westminster Creek, a tributary of the West Don River, in an area approximately 1,000 metres north of Highway #7, Town of Vaughan (The Regional Municipality of York), Don River watershed, be approved, subject to: (a) Final approval of the detail design by the Authority staff, (b) Every effort being made to avoid silt;ng of the creek during construction. CARRIED, 17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l, Humber River Watershed Component -Property: The Municipality of Metropolitan Toronto Res. #304 Moved by: Mrs. L. Hancey Seconded by: M.W.H. Biggar RESOLVED THAT: The Report (July 17, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED, "Re: project: Interim Water and Related Land Management projec~ 1979-198: Flood Plain and valley Land Acquisition Component - Humber River Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.Sl, Meeting No.3 - April 21, 1978 Subject Property: North-west corner of Irwin and Albion Roads OWner: The Municipality of Metropolitan Toronto Area to be Acquired: 0.247 acres, more or less Recommended Nominal consideration of $2.00 plus legal costs. Purchase Price: "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being Part of Lot 1, Plan M-590, Borough of Etobicoke, The Municipality of Metropolitan Toronto, located on the north-west co~ner of Irwin and Albion Roads in the Thistletown area. "Negotiations have been conducted with officials of The Municipality of Metropolitan Toronto and, subject to the approval of your Committee, agree- ment has been reached with respect to a purchase price, as follo~s: The purchase price is to be the sum of $2.00, plus legal costs. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental tp the closing, for land transfer tax, legal costs and disbu~sements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. . "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Minister of Natural Resources for an Inspectio~ Certificate." -9- 8-232 18. ONTARIO HYDRO -Request for Permanent Easement, Borough of East York A staff communication was presented advising that a request has been received from Ontario Hydro for a permanent easement required for construction of "a proposed 230KV power line across Authority-owned land on the west side of the Don Valley Parkway, south of Millwood Road. . Res. '305 Moved by: J.S. Scott Seconded by: Mrs. F. Gell RESOLVED THAT: A permanent easement be granted to Ontario Hydro, required for construction of a proposed 230KV power line across Authority-owned land on the west side of the Don Valley Parkway, south of Millwood Road. Said easement is as shown on Drawing No. TD28999Z, dated June 16, 1978, prepared by Ontario Hydro, and consists of approximately 0.46 acres, being Part of Lot ll, Concession III, F.T.B., Part of Lot 15, Concession II, F.T.B., and Part Qf the Road Allowance between Concessions II and III, F.T.B., Borough of East York, The Municipality of Metropolitan Toronto. The compensation for the said easement is to be at the rate of 75 percent of $3,000.00 per acre for the area affected, plus survey and legal costs; and THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l -Erosion Control & Slope Stabilization in The Regional Municipality of York: Proposed Remedial Work - Pine Valley Drive, Town of Vaughan (Humber River Watershed) A staff communication was presented advising that, as outlined in the staff report entitled "Erosion Control and Bank Stabilization in the Regions of Peel, York and Durham", which was approved by the Executive Committee at Meeting #15/78, remedial work is proposed at the rear of #8254 Pine Valley Drive and vicinity in the Town of Vaughan. Res. '306 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: Erosion control work be carried out at the rear of .8254 Pine Valley Drive and vicinity in the Town of Vaughan (Humber River watershed) at an estimated cost of $12,300.00; and THAT the approval of the Ministry of Natural Resources be requested; AND FURTHER THAT the benefiting property owner be required to pay an amount of $l,200.00. CARRIED, 20. WAIVER OF RIPARIAN RIGHTS: NEW WESTMINSTER CREEK (DON RIVER WATERSHED) A staff communication was presented advising that, as part of the approval for the diversion of the New Westminster Creek (Item 116 of these Minutes refers), the Ministry of Natural Resources requires that all riparian owners affected by the diversion must give written permission that they are willing to waive their riparian rights. Since The Metropolitan Toronto and Region Conservation Authority is a land- owner on the New Westminster Creek below the proposed diversion, it has' been requested to waive its riparian rights. Res. '307 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: The Me~ropolitan Toronto and Region Conservation Authority notify the Ministry of Natural Resources, in writing, that the Authority is prepared to waive its riparian rights on the New Westminster Creek. CARRIED, B-233 -10- NEW BUSINESS 21. THE CONSUMERS' GAS COMPANY -Re9uest for Permanent Easement A staff communication was presented advising that a request has been received from The Consumers' Gas Company to provide a permament easement for.a 4~ gas pipeline, located on the south side of Fisherville Road in the Steeles Avenue/Dufferin Street area, City of North York. Res. *308 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: A permanent easement be granted to The Consumers' Gas Company for a 4" gas pipeline located on the south side of Fisherville Road in the Steeles Avenue/Dufferin Street area. Said easement affects .011 acres of Authority-owned land, known as Part of Virginia Street, Registered Plan 2570, City of North York (The Municipality of Metropolitan Toronto) . Said easement to be granted for the nominal sum of $200.00, subject to The Consumers' Gas Company being responsible for carrying out and pay~ng all legal, survey and other costs involved in the transaction; and THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED, 22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Cusco Fabrication Limited To enclose a section of existing channel carrying a tributary of the Don River, just east of Yonge Street, south of Elgin Mills Sideroad, Town of Richmond Hill A staff communication was presented advising that an application has been received from Cusco Fabrication Limited for permission to enclose a section of an existing channel, which is a tributary of the Don River, at the above location. Res. *309 Moved by: Dr. T.H. Leith Seconded by: MrS. L. Hancey RESOLVED THAT: The staff communication, together with the application'of Cusco Fabrication Limited, be received, and THAT the application of Cusco Fabrication Limited for a permit to enclose a section of an existing channel which carries a tributary of the Don River, in the area just east of Yonge Street, south of the Elgin Mills Sideroad, in the Town of Richnlond Hill (The Regional Municipality of York), Don River watershed, be approved, subj ect to: (a) The rip rap located at the outlet of the culvert being extended to 30 feet from the outlet, (b) The rip rap works being preceded by a filter mat or a 6"-12" layer of crushed stone, (c) The Town of Richmond Hill engineers being satisfied with the proposal, (d) Every effort being made to minimize the silting of the creek duri~g construction; (e) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED, 23. AQUAPRO DIVING COURSE -Attendance at A staff communication was presented advising that the Waterfront Monitoring Program involves a considerable amount of underwater investigation to deter- mine the suitability for fish spawning and habitat, also, monitoring of the landfilling process frequently involves examination of ~e slope of the land- fill to assess stability. Mr. Alan Hayton, Project Biologist with 'the Water ResoUrce Division, is a certified diver who presently undertakes many of th'ese investigations, with -ll- B-234 the assistance of a consultant or other professional diver. .Mr. Ken Snowden, Biological Technician with the Water Resource Division, has recently registered in the Aquapro Diving Course. Res. #310 Moved by: Mrs. L. Hancey Seconded by: M.J. Breen RESOLVED THAT: Mr. Ken Snowden, Biological Technician, Water Resource Division, be reimbursed in the amount of $100.00, this being the total cost of the Aquapro Diving Course in which he is presently registered. CARRIED, 24. AUTHORITY REQUESTED MOVING EXPENSES -Miss Jean Wansbrough A staff communication was presented advising that the following quotations have been received for the removal of the personal belongings of Miss Jean Wansbrough from Markham to Pal grave and various office equipment .and files from the Claremont Conservation Field Centre to the Albion Hills Conservation Field Centre: Company Estimated Cost Aero Mayflower Transit Company Ltd. $2,Ol5.05 Thomson Moving and Storage 2,515.30 Rockbrune Brothers Limi ted 4,379.10 Res. #3ll Moved by: Mrs. S. Martin Seconded by: Dr. T.H. Leith RESOLVED THAT: The quotation received from Aero Mayflower Transit Company Limited for the removal of Miss Jean Wansbrough's personal belongings from Markham to Palgrave, and various office equipment and files from the Claremont Conservation Field Centre to the Albion Hills Conservation Field Cen tre, in the amount of $2,Ol5.05, be accepted, it being the lowest estimate received. CARRIED; 25. EXECUTIVE COMMITTEE - SPECIAL MEETING Res. #312 Moved by: M.W.H. Biggar Seconded by: J.S. Scott RESOLVED THAT: A Special Meeting of the Executive Committee be held to discuss the procedures with respect to Hearings under Ontario Regulation 735/73 and to review technical data available to the Committee to assist them in making decisions regarding applications under the Regulation. 26. AUTHORITY MEETING #5/79 CARRIED; -October 12, 1979 It was suggested that consideration be given to holding the next meeting of the Authority.at The Regional Municipality of Peel on Friday, October 12, 1979. 27. ADJOURNMENT On Motion, the Meeting adjourned at 2:45 p.m. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer II'IK Mil( N: I lQfil 1 9 7 9 BUD GET REV I S ION S PAGE: 13 ~ ~ 0 fil ::r:: PROGRAM: OPERATIONS & MAINTENANCE - COMMUNITY RELATIONS - INFORMATION , EDUCATION DATE: July 17, 1979 u II) U~t;HA'l' .1 Ul'l 5 PURPOSE: To provide an outdoor and conservation education program for school students and other community groups at four Conservation Field Centres and a variety of outdoor and conservation education opportunities for the general public and school groups at the Kortright Centre for Conservation and at the Black Creek Pioneer Village. 1979 OBJECTIVES: - a continuation of the program at the same level of service as in 1978 for existing facilities; - the opening of the Kortright Centre Building for public use; . - to provide an outdoor and conservation education program for the following estimated number of studentl and adults: - Black Creek Pioneer Village 64,000 - Conservation Field Centres 15,500 - Albion Hills Conservation Farm 9,000 - Maple Syrup Days 31,000 - Special Days, Field Trips, Claireville Dam Tours, etc. 12,000 - Kortright Centre for Conservation 50,000 FUNDING: Program revenues and the General Levy on all participating municipalities. A surplus or deficit on the operations of the Boyd Conservation Field Centre will, by agreement, be charged or credited to the participating boards of education. A grant of $33,113.00 from the Provincial Ministry of Culture and Recreation will be received for the operation of the Kortright Centre for Conservation and The Metropo- litan Toronto and Region Conservation Foundation Kortright Centre Growth Endowment Fund will p~ovide another $5,000. . /mrp 1979.07.18 191'9 BUD GET REV I S ION S PAGE: ~ PROGRAM: OPERATIONS & MAINTENANCE - COMMUNITY RELATIONS - INFORMATION & EDUCATION DATE: July 17, 1979 OPERATIONS o RIG I N A L BUDGET REVISED BUDGET Sources of Financing Sources of Financing Net Provincial Municipal Net Provincial l-Iunicipal ACTIVITY Expenditures Grant .Levy Other Expenditures Grant Levy Other Albion Hills C.F.C. - - - - - - - - Boyd C.F.C. - - - - - - - - Claremont C.F.C. - - - - - - - - Cold Creek C.F~C. - - - - ~ .:: - - Lake St. George C.F.C. - - - - - - - - . General Interpretive Program - - - - - - - - B.C.P.V. Pioneer Life Program - - - - - - - - B.C.P.V. TOur Program - - - - - - - - Kortright 55,000 18,000 32,000 5,000 70,113 33,113 32,000 5,000 \D f'I) N I lEa B-237 SCHEDULE "B" TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. MEETING 1110/79 RE: HISTORICAL SITES DIVISION STAFF PROGRESS REPORT APRIL 1 TO JUNE 30, 1979 1) PROGRAM (a) Registration and Artifacts Black Creek received 33 donations comprising 204 items. These include a large donation of 90 artifacts, consisting of lamps, furniture and rugs from Dr. R. Birrell. Another donation contained 54 early twentieth century toys. Other recent acquisitions include 4 early pocket watches and from the Craig Wakely Estate in Bolton a large bob sled once used on the High Park run. Since the end of May the Registration Department has had the assis~ance of a cataloguing team of three students through the Experience '79 Pro- gram 0705 from the Ministry of Culture and Recreation. With the team's assistance, all recent acquistions, as well as approximately 500 pieces of the Miss E. McNair glassware donation, have been catalogued. Work is progressing on storage relocation and the Mackenzie Home basement has been refitted and prepared to house the textile collection. Some furniture from the collection is being restored by the Village cabinet- maker in preparation for the Sawyer's House. A fine 1789 Bible was restored by the bookbinder in the village. The horse tread mill and the stump puller have been completely restored and made operable. (b) Publicity and Promotion Black Creek has assisted Gibson House, Sibbald Point Provincial Park, Forwarder's Museum of Prescott, and Toronto Historical Board with artifacts for displays. Also, a large collection of Victoriana was loaned to the Sheraton Centre in Toronto for an exhibit. Several agencies used Black Creek as a location for commercial photography. The Media Centre at university of Toronto filmed part of a Canadian History documentary, "The Last Buffalo Hunter" in the Broommaker's Shop. Conestoga College used the Gunsmith Shop and the Village gunsmith in a film on metal crafts to be used for the promotion of a new course in this field. Woolworth's took photographs to be used in a "back-to-school" flyer for later this summer. Also, the Village has been used by several photography students for school projects. Local newspapers and magazines have continued to be supportive of Black Creek and numerous photographs and articles have been published through the spring on village activities. Village staff have been called on to talk to 'various groups, about village activities and nineteenth century Ontario life. Lectures have been pre- sented to the Thornhill Lionettes, the Society for the Preservation of Historic Thornhill, the University Women's Group of Weston, and a group at the Church of the Good Shepherd. Two staff members instructed at a one-day Ontario Museum Association Seminar on "Interpreting the Historic Site". C.F.T.O. "Canada Today" featured the village as part of their Victoria Day. show with film footage shot at Black Creek and a staff person interview with Pat Murray. On his C.F.R.B. program, John Bradshaw did four village interviews. One of these was with the clockmaker, which resulted in a substantial increase of business for him. (c) Special Events 20 weddings were held at the Village, and there have been 25 receptions and banquets at Half Way House. B-238 HISTORICAL SITES DIVISION STAFF PROGRESS REPORT APRIL 1 TO JUNE 30, .1979 Page 2 Another successful Rogationtide Service was held on June 3rd. Once again Bishop Read, Suffragan Bishop of Toronto, led the service. . A visit to Black Creek was included on the itinerary of several notable groups, including delegates to the Wedgewood Seminar held in Toronto, the Ontario Heritage Foundation, the National Historic Sites Board and a group of students from the Graduate Program in Museum Studies, New York State College, Cooperstown. (d) Building Maintenance and Construction Work is progressing well on the renovation of the upper floor of the Administration Building and, with the assistance of Mimico workefs, improved lighting has been installed throughout. A new ventilator system has been installed in the Haif"Way House kitchen. The skate shack in the lower parking lot has been moved and will be used for lumber storage. Two school portables have been moved in to replace the skate shack and will be refurbished to be used as shelter for school groups. (e) Ground Maintenance and Development A new picket fence has been constructed in front of the Weaver's Shop. New rail fencing has been installed to protect the slopes behind Fisher- ville Church and the wagon turn has been relocated to the end of the boardwalk below the Church. Village staff have assumed responsibility for grounds maintenance at Head Office. (f) Livestock 30 lambs were born this spring, bringing the number of sheep to over 50. All the mature sheep have been shorn and extra fleeces will be made avail- able for sale. A filly was born on the May 24th week-end and therefore named 'victoria'. Four young Tamworth sows have been purchased. (g) lli!! Two staff members were asked to act as resource people at a training seminar on cataloguing and research given by the Ministry of Culture and Recreation for their Experience '79 students. One staff member attended the Canadian Museum Association annual conference in British Columbia. Expenses were paid by the ~ntario Museum Association and the staff member involved. Two staff members attended a one-day seminar on Costume Cataloguing given by the Costume Society of Ontario in London. 2) FINANCIAL STATEMENT -J~ 1 to June 30, 1979 Total Budget Used Operations Appropriation Budget Variance , Expenditures $ 422,083 $ 889,000 $ 466,917 47 Revenue $ 304,495 $ 822,000 $ 517,505 37.04 Development Expenditures $ 2,652 $ 70,917 $ 68,265 3 B-239 HISTORICAL SITES DIVISION STAFF PROGRESS REPORT APRIL 1 TO JUNE 30. 1979 Page.3 3) FINANCIAL COMM~NTS (a) Operations & Maintenance Black Creek Pioneer village Total attendance to June 30, 1979, is 96,974, down from 106,705 at the same time in 1978, due mainly to weather conditions on week-ends. As a result, gate revenue is down by $10,825.45 from 1978. Sales outlets, however, '.have shown an increase of $8,548.45 over last year. Village citizenships increased during the second quarter of 1979 from l82 to 371 members. The Dickson's Hill School Program was again fully booked, with 10 classes attending during the spring session. The government-sponsored Experience '79 Program has enabled the Village to hire 19 students to assist in interpretation, office work, mainten- ance, livestock, costume department and gift shop. Also, the Ministry of Culture and Recreation Experience Program 0705 has provided 2 researchers and 3 cataloguers for the summer. The Southern Ontario Unit of the Herb Society of America and the Dunning- ton Grubb Foundation have sponsored a gardener for the summer to work on the Doctor's House garden and the Herb Garden. (b) Historical Sites Development Capital development will be limited to three major restorations this year - the Taylor Cooperage, the Richmond Hill Manse and the Sawyer's Home. Funds have been made available through the Metropolitan Toronto and Region Con- servation Foundation, Wintario and the Junior League of Toronto to com- plete the restoration of the Cooperage and the Sawyer's Home. It is hoped that funds will be available in 1980 to complete the Richmond Hill Manse. $lO,OOO has been added to the Development budget to move and refurbish two portable classrooms. TO: The Chairman and Members of the Executive Committee, M.T.R.C,A. B-~40 Meeting '10/79 ~ Wednesday, July 25, 1979 FR: Alan D. Harris, Administrator, Finance Division RE: STAFF PROGRESS REPORT '2/79 - JANUARY I, 1979 TO JUNE 30, 1979 - FINANCE DIVISION Total To !Ii of Forecast to ADMINISTRATION Budget June 30/79 Budget Dec. 31/79 $ $ $ Revenues 70,000 30,550 44 70,000 - - Expenditures Salaries 560,150 279,902 49 560,150 Employee Benefits 440,500 214,152 48 440,500 Travel Expenses 97,500 41,703 42 97,500 Vehicles & Equipment 36,000 18,741 52 35,000 Materials & Supplies 81,500 46,388 57 82,500 Rent & Utilities 77,250 35,922 46 77,250 General Expenses 54,100 11,096 21 54,100 - 1,347,000 647,904 48 1,347,000 - - Expenditures are on budget for the following activit.ies.:- salaries, employee benefit and travel expenses. Vehicles & Equipment Office Equipment 6,000 6,368 106 6,500 Leased Vehicles 30,000 12,373 41 28,500 - 36,000 18,741 52 35,000 - - a) Office Equipment expenditures are estimated to be overspent by $500.00 due to the higher cost of replacement. b) Leased Vehicles are estimated to be underspent as lower than anticipated maintenance costs are being incurred. Materials & Supplies Uniforms and Equipment 7,500 11,213 149 8,000 Postage 16,000 8,841 55 16,500 Stationery and Office Supplies 50,000 17,926 36 49,500 Office Equipment Maintenance 8,000 8,408 105 8,500 - 81,500 46,388 57 82,500 - - a) Uniforms and Equipment expenditures represent purchases for inventory and are reduced as recoveries are made from sales to employees. An overexpenditure of $500 is estimated. b) Postage expenditures are expected to be ~verspent by ~500. c) Stationery and Office Supplies are expected to be under spent by $500. d) Office Equipment expenditures include payment for service contracts for office equipment for the year. It is estimated that this account will be overspent by $500. as a result of the higher costs of service contracts. Rent & Utility Services: Expenditures are on budget for this activity based on projected expenditures for the balance of the year. General Expenses: The low level of expenditures to date in this activity has been anticipated as most .payment (insurance, audit fees etc...) are made in lump sums. B- 241 Executive Committee Meeting '10/79 Staff Progress Report #3/79 - January 1 - June 30, 1979 - FINANCE DIVISION Total To .\ of Forecast to GENERAL OPERATIONS Budget June 30/79 Budget Dec. 31/79 $ $ $ Revenues . Rental Properties etc... 16,500 22,355 135 27 ,000 Interest (Net) - (22,989) - 12 , 000 - 16,500 (634) 4 39,000 - - Expenditures Office Cleaning 19,000 7,143 37 19,000 Office Maintenance 32,000 20,373 63 35,000 Oth~r Expenditures 61,000 4,734 8 61,000 - 112,000 32,250 29 115.000 - - Revenues: It is anticipated that the unfavourable interest income will be reversed by December 31, 1979 and a net interest income of $12,000 will be attained. Expenditures: Office Maintenance expenditures will be overspent by $3.000 due to higher costs of maintenance. This overexpenditure will be financed from general revenues. Other expendit~res are on target. Ins~rance payments are paid in a lump sum and will be paid shortly. Head Office Renovations will also be made later in the year. Vehicles and E~uipment Suspense. Budget will be expended at the end of the year as vehicles and equip- ment are replaced. 1979.07.12. B-242 STAFF PROGRESS REPORT Property Division During the period April 1, 1979, to June 30, 1979, the Property Division completed the acquisition of 9 new properties containing 168.796 acres. The total acreaqe of lands owned by the Authority, as of June 30, 1979, is 26,534.905 acres. The Property Division also carried out all of the routine admini- stration management required in connection with Authority owned lands, i.e. agreement, easements, taxes, leases, rentals, insurance, etc. A breakdown of the properties and acreages acquired by the Authority to date is as follows: FLOOD CONTROL AND WATER CONSERVATION ETOBICOKE CREEK WATERSHED 2 - Properties settled during period containing 58.383 acres - 1 property expropriated during period containing 53.363 acres - 1 purchase and 1 expropriation Total to date--62 properties acquired containing 407.774 acresJ - 2 expropriations outstanding MIMICO CREEK WATERSHED Total to date--23 properties acquired containing 75.475 acreSJ HUMBER RIVER WATERSHED 2 - Properties settled during period containing ~0~.~44acres - 2 purchases Total to date--725 properties acquired containing 8,358.177 acresJ - 1 expropriation outstanding DON RIVER WATERSHED 3 - Properties settled during period containing 7.782 acres - 3 purchases Total to date--157 properties acquired containing 1,786.04l acreSJ - 3 expropriations outstanding HIGHLAND CREEK WATERSHED Total to date--139 properties acquired containing 821.229 acreSJ ROUGE RIVER VALLEY WATERSHED Total to date--109 properti~s acquired containing 2,073.686 acresJ DUFFIN'S CREEK WATERSHED 1 - Property settled during period containing 0.207 acres - 1 purchase Total to date--77 properties acquired containing 885.869 acresJ CONSERVATION AREAS: - Albion Hills Conservation Area Total in Area--34 properties containing 1,044.142 acres; B-243 - 2 - - alack Creek Conservation Area Total in Area--7 properti~s containing 113.966 acres; - Bolton Community Conservation Area Total in Area--4 properties containing 18.043 acresJ - Boyd Conservation Area Total in Area--12 properties containing 99l.090 ac~es; - Bruce's Mill Conservation Area Total in Area--2 properties containing 267.038 acreSJ - Cedar Mill Property Total in Area--l property containing 0.337 acreSJ - Claireville Conservation Area Total in Area--l property containing 28.1l4 acres; - Claremont Conservation Area Total in Area--5 properties containing 396.750 acresJ - Cold Creek Conservation Area Total in Area--6 properties containing 467.880 acres; - Frenchman's Bay Conservation Area total in Area--9 properties containing 49.430 acresJ - Glassco Park Total in Area--l property containing 482.000 acreSJ - Glen Haffy Conservation Area Total in Area--ll properties containing 802.206 acresJ - Greenwood Conservation Area Total in Area--14 properties containing 680.648 acreSJ - Heart Lake Conservation Area Total in Area--8 properties containing 380.663 acreSJ - Humber Trai.ls Conservation Area Total in Area--l property containing 48.664 acres; - Oakbank Community Pond Total in Area--l property containing 9.350 acreSJ - Petticoat Creek Conservation Area Tota~ in Area--l property containing l77.9l8 acresJ - Lake St. George Conservation Area Total in Area--l property containing 319.250 acresJ B-244 - 3 - - Tam O'Shanter Conservation Area Total in Area--l property containing 118.626 acres; , FOREST AND WILDLIFE AREAS: - Gibson Lake Forest and Wildlife Area Total in Area--l property containing 137.160 acres; - Glen Major Forest and Wildlife Area Total in Area--10 properties containing 1,442.057 acres; - Goodwood Forest and Wildlife Area Total in Area--6 properties containing 307.639 acres; - King Creek Forest and Wildlife Area Total in Area--l property containing 0.185 acres; - Palgrave Forest and Wildlife Area Total in Area--7 properties containing 628.432 acres; - Peter Wright Forest and Wildlife Area Total in Area--l property containing 20.939 acres; AGREEMENT FOREST LANDS: - Uxbridge Forest and Wildlife Area Total in Area--l property containing 93.000 acres; - Humber Forest Area Total in Area--22 properties containing l,803.l65 acres; NIAGARA ESCARPMENT LANDS: Total in Area--4 properties containing 25l.926 acres; WATERFRONT PLAN: - Project W.F.-l - Etobicoke Sector Total to date--6 properties acquired containing 68.6l6 acres; - Project W,F.-2 - Ashbridge's Bay Sector Total to date--l property acquired containing 29.618 acres; - Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete) Total to date--4 properties acquired containing 0.64l acres; - Project W.F.-3A - Pickering/Ajax Sector (Ext. No.1) Total to d~te--l49 properties acquired containing 491.0l3 acres; B-245 - 4 - - Project W.F.-4 - Scarborough Sector 1 - Property settled during period containing 0.580 acres - 1 purchase Total to date--52 properties acquired containing 456.l48 acres - 1 expropriation outstanding SUMMARY FLOOD CONTROL AND WATER CONSERVATION: April 1 to June 30, 1979 - 8 properties settled containing 168.216 acres; - (7 purchas~s and 1 expropriation) - 1 property expropriated Total to date--l,292 properties acquired containing 14,408.251 acres; - 6 expropriations outstanding~ CONSERVATION AREAS: April 1 to June 30, 1979 - Total to date--120 properties acquired containing 6,396.115 acresJ FOREST AND WILDLIFE AREAS: April 1 to June 30, 1979 - Total to date--26 properties acquired containing 2,536.412 acres; AGREEMENT FOREST LANDS: April 1 to June 30, 1979 - Total to date--23 properties acquired containing 1,896.165 acres; NIAGARA ESCARPMENT LANDS: April 1 to June 30, 1979 - Total to date--4 properties acquired containing 25l.926 acres; WATERFRONT PLAN: April 1 to June 30, 1979 - 1 property settled during period containing 0.580 acres - ( 1 purchase) Total to date--2l2 properties acquired containing 1,046.036 acreSJ - 1 expropriation outstanding; GRAND TOTAL OF ALL PROJECTS April 1 to June 30, 1979. - 9 properties settled containing 168.796 acreSJ - (8 purchases and 1 expropriation) - 1 property expropriated during periodJ Total to date--l,677 properties acquired containing 26,534.905 acresJ - 7 expropriations outstanding. B-246 TO: Executive Committee, M.T.R.C.A. Mtg. #ll/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1979 TO JUNE 30, 1979 FLOOD CONTROL SECTION 1) MAINTENANCE WATER CONTROL STRUCTURES (a) PROGRESS Normal day to day maintenance was carried out on all the water control structures. The study of the Lower Humber weirs and the fencing of the Brampton Diversion Channel have been started and should be completed early in July, 1979. (b) FINANCIAL STATEMENT TO JUNE 30. 1979 Year " of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec/3l/79 $ $ $ $ " $ Mainte- 62,870.46 l2,3l8.00 75,188.46 183,700.00 40 l83,700.00 nance (c) FINANCIAL COMMENT The maintenance programme is on target and it is expected to expend this total budget this year. 2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS (a) PROGRESS Flood Warninq and Forecastinq Svstem The mobile radios ordered for this year have been received and installed. The acquisition of recording rain gauges is still under study for this year. (b) FINANCIAL STATEMENT TO JUNE 30. 1979 Year " of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec/3l/79 $ $ $ $ " $ Telemark 3,670.57 0 3,670.57 8,000.00 45 8,000.00 Gauges Radio 633.53 l5,765.78 l6,399.3l l5,000.00 l09 l6,399.3l System Staff 33,000.47 0 33,000.47 65,800.00 50 65,800.00 Salaries Staff 473.84 0 473.84 3,700.00 12 3,700.00 Travel . '37,778.4l l5,765.78 53,544.19 92,500.00 57 93,899.31 ../2 B-247 TO: Executive comndttee, M.T.R.C.A. Mtg. #ll/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 2 . 2) (c) FINANCIAL COMMENT The expenditure under the telemark gauges was due to an unpaid commitment made in 1978 however, it should not seriously affect the Authority's plans to acquire recording rain gauges this year. Due to the increase in the price of mobile radios, a small over-expenditure will occur under this item. Remainder appears to be on target and it is expected to expend the total budget this year. 3) INTERIM PROJECT CAPITAL (a) PROGRESS The Flood Plain Acquisition Programme continued during this period again with concentration being made on properties within the Village of Stouffville and as of the end of June all, but one, properties have been closed. The Environmental Monitoring Programme has started and should be complete by early fall. The various studies quoted under the Flood Control Plan Review are under way and has also seen the completion of all the floodline mapping except the Humber River which is expected this summer. The Damage Centre Analysis study is still under way and should be canplete on schedule. (b) FINANCIAL. STATEMENT TO JUNE 30. 1979 Year ' of Forecast To Date Total Budqet to EX%end. Comm\tments AP~rop . Budqet Used Dec/31/79 $ , Flood Plain 881,181.83 369,037.00 1,088,036.30 667,273.00 163 1,088,036.30 Acquisition Headwater 150,762.70 0 150,762.70 200,000.00 75 200,000.00 Acquisition Environmental 11,419.83 0 11,419.83 100,000.00 11 100.000.00 Monitoring Flood Control 97,285.22 2,730.10 100,015.32 297,000.00 33 297,000.00 Plan Review Milne Workshop 9,872.82 0 9,872.82 20,450.00 48 10.000.00 1,150,522.41 371,767.10 1,522,289.51 1,359,723.00 111 1,69~. 036.'00 B-248 TO: Executive Committee, M.T.R.C.A. Mtg. #ll/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL_l, 1979 TO JUNE 30, 1979 Page 3 3) (c) FINANCIAL COMMENT Due to the necessity of acquiring all of the remaining properties in the Village of Stouffville this year, the property budget is over-expended. The change in this budget from $l,339,273.00 to $1,359,723.00 is due to the increased funding we received from the Federal Government under the Flood Damage Reduction Programme. 4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS W.C.-S8 - Don River - Bathurst Street to Finch Avenue This project has been completed and paid for at this time. Erosion Control and Slope Stabilization in Metro: ITEM LOCATION WATERSHED STATUS Major Remedial Work 6-l4 Sulkara Court Don River Completed Revegetation in the fall 19-45 Riverview Heights Humber River Completed 50-58 Stanwood Crescent Humber River In progress Enfield/Sunset/Jellicoe Etobicoke In progress Ave. Creek Minor Remedial Work Beechgrove Rd. - Phase II Highland Completed Creek 34 Restwell Crescent Don River Completed Revegetation in the fall . Together with the foregoing, Spring revegetation was carried out at 8 sites and maintenance work was carried out at 4 sites. Erosion Control and Slope Stabilization in Peel. York and Durham: I REGION LOCATION WATERSHED STATUS York 14th Avenue Rouge River Completed Lots 5 & 6, Conc.8 York 19th Avenue Rouge River Completed Lot 30, Conc. 8 Peel l38 King Street Humber River In progress Vicinity, Bolton ../4 B-249 TO : Executive Committee, M.T.R.C.A. Mtg. #ll/79 FROM:' Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 4 4) (a) PROGRESS Reconstruction of Hiqhland Creek 1979 was the third year of the three-year programme for remedial work within the Highland Creek. Work has been completed at the following sites. It is expected that all of the sites damaged by the sto~s in 1976 and 1977 will be repaired as contemplated under this project by the end of 1979. LOCATION STATUS Morningside Parks Yard Completed Scarborough College - Tennis Courts Completed South of Kingston Road Bridge Completed Enqineerinq Studies: Stouffville Channel Detailed engineering has been completed and this contract has been tendered and it is expected to commence construction early in August, 1979. Wilket Creek Enqineerinq Study This study is expected to commence later this year once the canpleted Hydrologic Model study and floodline study have been received. Oak Ridqes Study Draft report of this study. has been received and it is exPected to finalize it early this summer. ../s B-250 TO: Executive Committee, M.T.R.C.A. Mtg. #11/79 ~ROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT ,FROM APRIL 1, 1979 TO JUNE 30, 1979 Page 5 4) (b) FINANCIAL STATEMENT TO .JUNE 30. 1979 Year " of Forecast To Date Total Budget to EXDend. Commitments ADDrOD. Budqet Used Dec/3l/79 $ $ $ $ " $ W.C.-58 99,690.00 0 99,690.00 99,690.00 lOO 99,690.00 Erosion 18l,738.9l 6,634.00 Control l88,372.9l 800,000..00 23 800,000.00 Metro Erosion 16,993.39 Control 0 16,993.39 200,000.00 8 200,000.00 Peel,York & Durham Highland l57,62l.60 0 l57,62l.60 240,000.00 65 240,000.00 Creek Restoration Stouffville 19,963.76 0 19,963.76 395,000.00 5 395,000.00 Channel Wilket 0 0 0 lO,OOO.OO 0 lO,OOO.OO Creek Oak Ridges 240.69 0 240.69 5,000.00 ,4 8,000.00 476,248.35 6,634.00 482,882.35 1,749,690.00 28 l,744,690.00 (c) FINANCIAL .COMMENT This budget is on target and it is expected to expend the total this year. 1979.07.l6 JCM/fn B-251 '1'0: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, .M.T.R.C.A. -Meeting #11/79 FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1979 to JUNE 30, 1979 Page 6 WATERFRONT SECTION The Authority received word from the Province early in 1979 that the Supplementary Waterfront Project had not been approved. The funds which were requested in the Supplementary Project were intended to allow the Authority to proceed with the shoreline management program, some additional development of the Western Beaches and to start the Colonel Samuel Bois Smith waterfront project. As a result of the province's. decision, these projects will again be deferred. The Municipality of Metropolitan Toronto has however, agreed to carry the Municipality's portion of the Supplementary Project in their forecast made again this year for funding in 1980. The Authority is particularly concerned with additional funds to be allocated for shoreline management and therefore, requested the support of the member municipalities in seeking supplementary funding from the Ministry of Natural Resources. Strong support has been received from Metro Toronto, the City of Toronto, scarborough and Etobicoke. It is now anticipated that a meeting will be held with the Minister, Mr. Auld to discuss this matter.in detail in the near future. COLONEL SAMUEL BOIS SMITH -The Master Plan for the site has been submitted to the Ministry of the Environment for approval under the Environmental Assessment Act, but to date no formal response has been received. It is still not certain if an Environmental Assessment hearing will be required. HUMBER BAY WEST -The total area created as part of the Humber Bay West project is now 64 acres. -The Master Plan shape has been achieved. -The Authority staff and rented equipment have now completed most of the rough grading of the site and the base for the access road has now been placed on the final alignment and base material has been installed in the parking lot and the boat storage area for the Humber Bay Boating Federation. -The Humber Bay' Boating Federation is having a very successful season. Approximately 460 boats are now moored at the site and the waiting list is growing rapidly. It is anticipated that the Federation will easily reach the design capacity of Humber Bay by next season and should be able to undertake the construction of some of the assoc~ated land based facilities. -One of the major components of the 1980 Waterfront Development program will be the armouring and servicing of the Humber Bay site. Design work will begin in the near future. HUMBER BAY EAST -A contract was awarded to M.A. Butt in the amount of $780,722.70 at Executive Committee meeting #8/79 on June 13, 1979 for the construction of the park buildings, foot bridges and other site development features. Construction will be underway by July 20th. -The landscaping plans have also been prepared, but funds will not permit this work to be completed in 1979. Final landscaping will be undertaken by the Conservation Land Management Division in the spring of 1980. The A.uthority staff is presently involved in the maintenance of existing p~ant material and grassed area. B-252 TOl THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. -Meeting #11/79 FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION REI WATER RESOURCE DIVISION PROGRESS REPORT FROM APRIL 1, 1979 to JUNE 30, 1979 Page 7 -An Authority crew will be on the site in the near future to begin work on the liner of the pond system. WESTERN BEACHES -The Authority's involvement in this area is virtually complete pending a decision on additional funding for the waterfront. -The Sunnyside Pavilion is continuing to deteriorate and since the Authority is unable to undertake the restoration of the building, the City of Toronto Parks Department has carried out some temporary work to protect users of the area. BLUFFERS, PHASE II -Fill volumes continue to be considerably lower than normal, but progress is being made towards the completion of the breakwater. Filling is presently concentrated on Point #9 to prepare for final armouring. -Federal funding of the project under the Small Craft Harbours Assistance Program is being continued to include the armouring of Points 8 and 9. Preparations are currently underway to award a contract for the armouring of Point 9 in the amount of approximately $280,000. Upon completion of this phase of the project, the total Federal expenditures will have reached $1,653,000. -The Bluffers Boating Federation has successfully installed approximately 110 mooring slips during the spring. Many of the docks were pre-fabricated by Pede ration members during the winter months and the piles driven and docks installed by Federation members during April, May and June. If the Authority is able to advance the landfilling suffiCiently by next spring, the Federation should have no difficulty in doubling the eXisting capacity for the 1980 season. -The construction of the launching ramps and day mooring docks is substantially complete with only minor details outstanding. The ramps have been used by the public for several weeks. The construction of the permanent parking lot assoc~ated with the day mooring docks, as well as the extension of the parking area associated with Phase I is underway and should be completed early in August. EAST POINT -Discussions are ongoing with the Authority's consul~ant, Hough Stansbury a~d Associates in an effort to finalize the Master Plan 'review and to prepare site plans in preparation for the construction to begin at this site upon completion of Bluffers Park. -The Easterly Filtration Plant, presently under construction by Metro Toronto, is nearing completion and Authority staff is working closely with representa- tives of Metro Works Dept. to take the maximum advantage of the construction activities ongoing in the area. Considerable volumes of fill and top soil which were surplus from the Metro Works site are available to the Authority for use in the construction of East Point Park. Since the East Point lands were used for storage of fill, materials, etc. during the construction of the Water Plant, the contractors are required to carry out certain works on Authority lands which will assist in the development of the park at no cost. B-253 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. -Meeting 1111/79 FROM: M.R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT ,FROM APRIL 1, 1979 to JUNE 30, 1979 Page 8 ENVIRONMENTAL MONITORING -The collection of field data on water quality, sediment quality, benthos and fish populations is well underway and extensive examination of bottom conditions in the area of East Point Park (by scuba diving) has been carried out by Authority staff and consultants. The work is being done as part of the Master Plan review. -The Ministries of the Environment and Natural Resources. continue to raise concerns about the landfilling process. A technical comittee has been recently established with representatives of the two Ministries and the Authority to review the impact of landfilling. Data collected in previous waterfront monitoring programs is extremely valuable in this process. SHORELINE MANAGEMENT -Preparation of a detailed Master Plan in the Scarborough sector is ongoing. The Authority is awaiting Provincial approval to retain a consultant to examine certain soil mechanics and slope stability questions along the Scarborough Bluffs, aimed at producing recommendations on appropriate construction techniques to stabilize the Bluff face after the toe of the Bluffs has been protected. -Construction of an offshore revetment is presently underway at Crescentwood Park. The work is being done to protect the toe of the fill material . placed by the Borough of Scarborough last fall to save portions of Crescentwood Road and underground services which were threatened. The work is being carried out by rented machines under the supervision of Authority staff. -The contract drawings for protective work along the Eastern Beaches in the City of Toronto have been completed. Unfortunately, the decision by the Province not to approve the Supplementary Project has resulted in insuffi- cient funding to undertake these works in 1979. ~ In N 'I IQ FINANCIAL STATEMENT TO JUNE 30, 1979 Year to Date Commitments Total Approp. Budqet , of Budqet Used Expenditures Colonel Samuel Bois 3,029.77 - 3,029.77 50,000 6 Smith Park Humber Bay West 92,8l7.8!i - 92,817.88 160,000 58 Humber Bay Ea'st 8,050.09 780,722.70 788,772.79 950,000 83 Western Beaches - - - 5,000 - Ashbridqe's Bay 3,664.21 - 3,664. 21 5,000 73 Bluffers Park 86,276.28 371,188.00 457,464.28 740,000 61 East Point 6,142.28 - 6,142.28 20,000 30 Petticoat Creek 3,890.61 1,279.64 5,140.55 20,000 25 Studies/Monitorinq 37,057.64 257.40 37,315.04 110,000 33 Shoreline Manaqement 7,523.20 430.92 7,954.12 500,000 1 Land Acquisition 318,241.19 1,525.00 319,766.19 240,000 133 PROGRAM TOTAL 566,663.45 1,155,403.66 1,7.22,067.11 2,80Q,000 61 The Waterfront Development Budget is qenera1ly on-tarqet, now that several major contracts have been awarded and commitments have been identified. The recent announcement of additional Federal fundinq ensures that no severe cuts will be required from other parts of the proqram to, cover the costs of armourinq at Bluffers Park. However, the over expenditure in the land acquisition component of the proqram, associated with the Sunny Point expropriation settJ:ement, will require a budqet amendment. Althouqh the expenditures for shoreline manaqement appear low, work is underway on several projects. B-255 TO: The Chairman and Members of the Executive Committee, M.T.R.C.A. Meeting #11/79 RE: INFORMATION & EDUCATION DIVISION PROGRESS REPORT - January 1 - June 30, 1979 (a) INFORMATION The Authority's information work is carried out under the Community and Staff Relations Program, which is comprised of four components, namely Administration, Conservation and Recreation Land Management Plan, Water and Related Land Manageme~t Plan, and The Metropolitan Toronto and Region Conservation Foundation. Highlights Included: _ the production of 230,000 pieces of literature including: _ 200,000 copies of the four-colour general brochure; _ lO,OOO copies of the 1919 Calendar of Events and Activities; _ 2,000 copies of the 1977-78 Biennial Report; _ 1,000 copies of th~ Meeting Facilities Brochure for the Kortright Centre for Conservation; - 500 copies of the 1979 Directory: _ 5,000 copies of the four-colour brochure for The Metropolitan Toronto and Region Conservation Foundation; _ 225 copies of the sixty-six-page catalogue for Foundation fund-raising: - 10,000.~tick-on name tags: _ preliminary work on the four-colour Black Creek Pioneer Village brochure (distribution to begin on July 16) _ the completion of five special printing project~ (26,200) for the Albion Hills ~onservation Field Centre, the Kortright Centre for Conservation, the Soil Conservation Society of America, Kortright Sunday Outings and Claireville Canoeing: . _ the Authority is participating in superguide (300,000) plus 300,000 copies of the Attractions with the Convention & Tourist Bureau of Metropolitan Toronto. Distribution is underway~ _ news and photo releases, reflecting the Authority's and Foundation's activities, have been written and distributed to media and School Boards (total distributed - 30,750) ; _ samples of 1,010 press clippings, on all aspects of the Authority's activities, ~ave been received: . _ eight special photo and four special news releases were written for the Kortright Centre Official Opening (limited distribution) ; _ one hundred and five colour television promos (one-minute), on the Spring and Summer related activities of the Authority, have been distributed and are in use; _ one Authority exhibit was set-up and on display for Canada Heritage Week in the Scarborough Town Centre and another was set- up for the Glaireville Dam Tour: _ the production and distribution of 1,500 copies of two issues of "Highlights" and 600 copies of one issue of "Inside": _ thirteen special photo assignments have been completed during this p~riod : _ three new one-minute colour public service films are now in progress . (one for the' Kortright Centre for Conservation, one for Flood Control and Water Conservation and one for The Metro~litan Toronto and Region Conservation Foundation); .. B-256 Page 2 TO: Chairman and Members of the Executive Committee, M.T.R.C.A. - Meeting #11/79 RE: INFORMATION "AND EDUCATION DIVISION PROGRESS REPORT - January 1 - June 30, 1979 - there are now new postage meter identification stamps, relating to Authority activities (eg. Alert Your Children of the Dangers of Spring Flooding; Black Creek Pioneer Village - open March 19 to December 30, 1979; Season's Greetings; Write for a Free Colour Brochure; Follow this Sign to the Conservation Areas; Managing Your Renewable Natural Resources); - invitations and programs were printed and arrangements were carried out for Arbor Day, May 8. One hundred and fifty people attended; - Authority presentations were made to the Oakville Kawanis Club, the Woodbridge Vaughan Rotary Club, Thornhill, and the Shriners' Club, Caledon; - two special press previews were planned and carried at the Kortright Centre for Conservation on June 11 and 12, to introduce the Centre to the members of the media; - staff took care of all physical arrangements for the Official Opening of the Kortright Centre, June 2l, 1979 and 825 people were in attendance; - invitations to Authority members and letters to service recognition award recipients were sent out in preparation for the Bill Davidson's Day Garden Party at Black Creek Pioneer Village, which was held on July 5; - preliminary design work has been completed for the Authority's C.N.E. Exhibit, that will be part of the Metroshow presentation by the Municipality of ~~tropolitan Toronto. The Authority's theme will be the 25th Anniversary of Hurricane Hazel; - distribution of Authority brochures and Valley Regulations has been completed to all municipal offices and many government agencies in the watershed; - notices have been sent out to inform all staff of the Town Hall Meetings to be held on September 11 and 12 at the Kortright Centre; - staff looked after invitations and R.V.S.P.'s for the Annual Sugaring Off Day, held at Bruce's Mill Conservation Area, on April 7; - staff attends regular meetings of the Attractions Council of the Convention & Tourist Bureau of Metropolitan Toronto. (b) EDUCATION (i) Residential Field Centres: - operating at about capacity; - accommodating the usual range of elementary and secondary level students and other groups such as girl guides, church groups, etc.; - the summer programs that include the Archaeology credit course for senior secondary students at Boyd, the March of Dimes summer camp at Claremont and the York University course in Conservation and Environmental Education (Geography 255) at Albion, will accommodate the largest number of students this summer; - the Practice Teaching Program of the Faculty of Education students from both the University of Toronto and Althouse College at the University of Western Ontario accommodated 67 student teachers for one week each. ...3... B-257 Page 3 TO: Chairman and Members of the Executive Committee, M.T.R.C.A. - Meeting #11/79 RE: INFORMATION AND EDUCATION DIVISION PROGRESS REPORT - January 1 - June 30, 1979 (il) Lake St. George Conservation Field Centre: - the students from the various Metropolitan Toronto School Boards contributed the partitioning, dry-walling, plumbing, wiring, painting, sheet metal and heating installation to the dormitory building; - the Metropolitan Separate School Board built the beds and the York County Board of Education have agreed to assist with the clean up and landscaping of the area surrounding the buildings; - the building will be occupied by September 4, 1979 and completed by the end of September. - the Metropolitan Toronto School Boards have approved the funding for Stage II and it is anticipated that. the Metropolitan Separate School Board and the York County Board of Education will approve their share of the funding for Stage II, prior to the end of September; (iii) Kortright Centre for Conservation: - officially opened on June 21, 1979, by the Ron. Robert Welch, Deputy Premier, Province of Ontario; - the Theme Report, for the design and program components related to the Water Theme, was approved by the Water Technical Review Committee; - a Fund Raising Committee was established by the Foundation, to raise $150,000; - the development of the outside area includes: (a) an operating sawmill; (b) the filling and landscaping of the wildlife pond; (c) the planting of trees and shrubs and the continued extension of trail development; (d) the development of the first phase of the patio; (e) the completion of the entrance road plan. (iv) Black Creek Pioneer Village: - a high interest by teachers and students and the continuation of the Practice Teaching Program for the Faculty of Education students from the University of Toronto; - the hosting of a number of teacher professional development days. FINANCIAL SUMMARY A. Operations and Maintenance - Community Relations Information & Education Operations. Expenditures Expenditures Expenditures 1979 Budget To-Date , of Budget ~ $859.,000 $323,000 38' Revenue Revenue Revenue 1979 Budget To-Date , of Budget $757,700 $325,000 431 ...4... B-258 Page 4 Chairman and Members of the Executive Committee, .TO: M.T.R.C.A. - Meeting Ul/79 RE: INFORMATION AND EDUCATION DIVISION PROGRESS REPORT - January 1 - June 30, 1979 B. Water and Related Land Management - Community Relations Program (Wl 0) 1979 Expenditures Expenditures Budget To-Date 11 of Budget $471,194 231,747 4911 (project elements) $239,000 111,263 47' (non-project elements) C. Conservation and Recreation Land Management - Conservation Area Information and Interpretive Program (C3) 1979 Expenditures Expenditures Budget To-Date , of Budget $21,000 10,954 52' FINANCIAL COMMENTS (a) Operations and Maintenance - Community Relations Expenditures are lower than anticipated and revenues are higher. (b) Water and Related Land Management - Community Relations Program (WIO) Project Elements: (i) Expenditures for furnishings and equipment at Kortright are in line with budget estimates. Exhibits, furnishings and equipment development will have to be curtailed in the near future, as a result of cash flow from the Foundation; (ii)The development of Stage I of Lake St. George will exceed the budget estimate and will be included in Stage II. (c) Conservation Area Information and Interpretive Program (C3) Expenditures are in line with budget estimates. T. E. Barber, Administrato~, Information & Education Division. TEB/mrp 1979.07.18 B-259 CONSERVATION LAND ~~NAGEMENT DIVISION PROGRESS REPORT JANUA~Y - JUNE, 1979 Conservation Servi~es: Private Land Assistance Programmes Approximately 5,959 deciduous trees and 12,994 shrubs have been planted for private landowners under the Farm Tree and Shrub programme. Reforestation' plantings on private lands increased this year 80%, as approximately 146,000 seedling trees were planted. One reforestation subsidy has been approved for a planting carried out in Uxbridge Township. Five private tree spade rentals have been completed and 6 requests remain on file. Plant progagation programme emphasis has resulted in a 50% increase in plant material available for services programmes. Stream Improvement Stream improvement projects scheduled for the July and August have begun. Six projects are planned. The Stream Enchancement Special Project is being planned and co-ordinated in conjuction with the Ministry of Natural Resources. This project will enable the Authority to carry out additional stream improve- ment projects on cold water (trout) streams within the watershed on private, public and Authority lands. Funding for the projects is available from the S.P.O.F. programme (Strategic Plan for Ontario, Fisheries). This summer a stream assessment programme is being undertaken on the headwaters of the Humber River to assist in priori zing streams for future projects. This stream assessment programme relates to the stream assessment work carried out by the Ministry on the Duffin Creek. Land Use Planning Eight site visits have been carried out ~or private landowners concerned with pond construction and aquatic weed control. One Conservation Plan is being prepared for a landowner in Caledon Township. Eight site visits have been carried out for farm tree and shrub programme, nine for private reforestation, two for private tree spade rental. On June 3, 1979, Conservation Services held a Conservation Field Day at the Palgrave Forest and Wildlife Area, approximately 30 people participated. Promotion of services programmes has resulted in the brochure and fact sheet on urban wildlife enhancement and grassed waterways. Authority Land Forestry Woodlot management has been carried out in the Boyd, Bruce's Mill and Claireville Conservation Areas, with additional work scheduled for Glen Haffy, Heart Lake, and Claremont. Woodlot management was also carried out at Lake St. George. To date, there has been approximately llOcu. meters and 6,OOObd.ft. of sawlogs produced. A portion of the sawlogs were taken to the Kortright Centre sawmill. Plantation management was carried out in a stand on the Gibson Lake property, 55 cubic meters of pulpwood were produced. This summer plantation management plans are being prepared for Glen Haffy, Palgrave and Glen Major. Reforestation trees were planted at Glen Haffy Conservation Area lO,OOO, Bolton Res. 1,500, Gibson Lake 10,000, Heart Lake 2,000, Boyd l,OOO, Lake St. George 2,500, Cold Creek 7,700, Claireville 6,300, Glen Major 2,900, Kortright Centre 3,900. These plantings represent a 50% increase from 1978. Boy Scout groups from York Region planted 20,000 reforestation trees at Claireville. Approximately 3,000 erosion control shrubs were supplied to the Flood Control Section. B-260 Stream Improvement Stream improvement projects are planned for Claremont Conservation Area (Duffin Creek), Humber Trails (Humber River) as well as Albion Hills. Land Management Biophysical inventories are being carried out at Claireville Conservation Area, Boyd Conservation Area, and Greenwood Conservation Area to assist in the preparation of resource management plans for Authority land. Landscaping A landscape project was carried out at the Kortright Centre for Conservation. A tree maintenance programme is being carried out at the Humber Bay Waterfront project. Plantings are anticipated to begin this year at the Thackeray Land- fill site. Conservation Areas: Operations and Development During the Winter, eight Conservation Areas were open for Winter activities. Most staff time was involved with routine operations. The ski programme . at Albion Hills operated at capacity. The Bruce's Mill programme ran below capacity. As this part of the programme becomes better known, this situation will improve. The improved ski trails at palgrave, Cold Creek, and Claremont were well used. This past ski season was shorter than previous years due to lack of snow in early January. On May 31, 1979, an Open House was held at the Claireville Conservation Area to launch the Authority's new canoe instruction and rental programme. As part of the Visitor Services programme a promotional brochure and flyer were circulated to schools, day camps, youth groups, and sports stores. Twenty- eight groups attended day instructional sessions. Two weekend courses and one evening course held were well attended by the general public. To date the weekend rental demand for the 16 canoes and 8 rowboats has been at or near capacity. The preparation of the Conservation Areas for the summer season proceeded on schedule. At Petticoat Creek the p'ool was resurfaced with asphalt and painted. The winterizing procedures carried out have substantially reduced the pre- season maintenance costs of that facility. Forty-two student have been hired under the Experience Programme to assist in routine operations, development and maintenance. This number includes 3 stude~ts who are working in a Visitor Survey of the Conservation Areas. Twenty-four day camps have arranged to utilize Conservation Areas in their summer programmes. Reservations for group picnics have equalled those of 1978. Although the March approval of the Conservation Areas Development Budget delayed,a number of development items, 60 picnic tables were constructed at Petticoat Creek prior to the area's opening, Plans have now been compl~ted for the Campground control building at the Albion Hills Conservation Area which will include accommodation for the campground ~upervisor. Temporary accommodation for the 'Supervisor is being provided in a rented trailer at present. Preliminary plans for the Col~ Creek Trap Control Building were presented to the Conservation Land Management Advisory Board. Plans for the further develo- pment of the rifle range parking lot and gatehouse are underway. B-261 During this period, staff finalized the Interim Conservation and Recreation Land Management Plan. Copies have been sent to the Province of Ontario and the Authority's member municipalities for comment. Staff have been meeting with Town Councils and Planning Boards as requested. To July 1st, 1979, Conservation Area attendance decreased 97,995 or 20.3' over the same period in 1978. 'This is a result of lack of snow during the early part of the Winter combined with a cool Spring. The following table compares individual Area attendance figures to July 1st, with the same period in the previous year. 1979, 1978 Albion Hills 73,327 102, l62 Boyd 56,132 76,877 Bruce's Mill 70,986 81,860 Claireville 27,324 33,544 Claremont 16 , 306 20,285 Cold Creek 14,606 20,147 Glen Haffy 28,966 26,406 Greenwood 2l,700 29,532 Heart Lake 37,893 56,352 Humber Trails 1,722 1,770 palgrave 5,898 Petticoat Creek 19, 868 19,364 Woodbridge 4 , 19 3 7,648 Indian Line Campground 5,290 6,239 384,211 482,186 Financial Statement - January - June 1979 Yr. to Date Total 'Budget Forecast To Expend Commit Approp. Budget Used Dec. 31/79 Cons. Areas I?evelop. 76,260 14,560 90,820 270,000 34% 270,000 Cons. Areas Operate 596,700 lO,777 607,477 1,370,900 44% l, 370,800 Rent & Utility Servo 19 , 211 - 19 , 211 39,000 49' 39,000 Private Land Progra~e 64,468 1,770 66,238 113,000 58% 113,000 Authority Land Progr~mme 28,668 - 28,668 95,000 30' 95,000 Cons. Area Revenue 295,577 - 295,577 710,000 42% 710,000. Private Land Revenue 11,753 - 11,753 l5,OOO 78' l5,000 Financial Comments To date 58% of Private Land Assistance Programme budget has been spent. Conservation Areas Operations expenditures during this period are as antic- ipated. Revenues are slightly down from previous years due to lack of snow at the beginning of the Winter season, and a cool Spring. Both spenqing and revenues will be within budget estimates. TO: Exec\luve CCmni.ttee, M.T.R.C.A., '11/79 RE: AC:ninistration of ontario Regulation - March, April, May and June, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Borough of Etobiooke V-235, n.ttch Sisters Inn - Penni.t applied for and issued (see V-251 & V-252) IDt 11 and 12 (Registered Owners) Rear of 2161 Lakeshore Blvd. west March 15, 1979 Casa Mendoza ~staurant Borough of Etobiooke V-236, Sanoor Paving - As above IDt 11 and 12 March 15, 1979 Rear of 2161 Lakeshore Blvd. West casa Mendoza Jeataurant Borough of Etobiooke V-251, n.ttc:h Sisters Inn - Pemdt issued & revoked for violati.a1. Rear of 2161 Lakeshore Blvd. West Mr. M. Iwaskykiw - lbauthorized material presently beinc;J renoved. Mendoza. ~staurant and Inn June 28, 1979 Borough of Etobiooke V-252, Dutch Sisters Inn - As above ~ of 2161 Lakeshore Blvd. west Mr. WIl. Heam (tenant) Waterfront June.28,1979 'lbwn of Caledon V-239, Dr. John Keith - Pond oonplete and 9raQing oonplete IDt 32, Cone. 3 May 18, 1979 - Staff is satisfied East of the 3m Line North of the 30th Sideroad 200 feet into the bush West bank of. tributaxy of Hunber River (I) 0 /It = tIj 1979.07.16 g t'4 tIj 1Il I . I\J 0 en . I\J b' Executive CCmnittee, M.T.R.C.A., 111/79 I '10: IIJ en RE: Mninistration of Ontario Regulation - March, April, May and June, 1979 w LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Borough of Etabiooke V-237, Blyth Hill Holdings Filling stq)ped ilrm:!diately Lot 12, Can. 1, R.P. 4532 March 28, 1979 i- Owners presently 1NOrking with staff and Etabiooke North side of Rathburn lbad East of Martin Grove Mimioo Creek Watershed Borough of Etobiooke V-238, Mazza Bros. Haulage As above Lot 12, Canc. 1, R.P. 4632 March 28, 1979 North side of Rathburn lbad East of t-1artin Grove Mimioo Creek Watershed City of Mississauga V-240, Frank & Lois MamtDliti Staff is m:ni.toring site Lot 110, Plan 722 May 18, 1979 East side of Ponytrail Drive west bank of Etobiooke Creek approx. half way bebleen Bloor Street and Burnhamthorpe lbad City of Branpton V-24l, ~ G:llf Club Site graded to the satisfaction of the staff of the Lot 6, Canc. 9 May 18, 1979 M.T.R.C.A. 150 feet east of the 8th Line on the east bank of the west branch of the Hunber River Town of Ric:tmDnd Hill V-242, Magpie-Managerie Holdings - Di.scussia1s ~ with the property a.mer. at the. dead end of Birch Avenue off (Dr. Solway) Bathurst Street, west of the. D:m River June 1, 1979 Lot 15, R.P. 1960, Cone. 1 W.Y.S., Ilt 1979.07.16 'ro: Executive Camlittee, M.T.R.C.A., 111/79 RE: Administration of Ontario Regulation - March, April, May and June, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN. '1\JWn of Ric::hm:md Hill V-243, Green & lbJdward Qlnst., - Staff to follow up at the dead end of Birch Avenue off June 1, 1979 Bathurst Street, west of the I))n River Lot 15, R.P. 1960, Oonc. 1 W.Y.S., Borough of J;:tobicoke V-244, Bxown JlcJ:es ~., - Filling stopped ilmedi.ately Lot 28, R.P. 1176 June 5, 1979 - No further acti.a1 necessary ~ar of 2135 Lakeshore Blvd. west (Casa Iana !btel) City of Mississauga V-245, M:>reni.sh land ~. Ltd., - Graded to the satisfacti.a1 of the M.T.R.C.A., on the floodplain of the west bank of June 6, 1979 the Etobicoke Cree, Block · JJ', R.P. M-58 North side of Burnhamthorpe !bad Garnetwood Park City of Mississau~ . V-246, Pleasant View Farms Ltd., - Staff following up on the south side of ~ st. East June 14, 1979 ~ mile east of Dixie !bad, east bank of Little Etobicoke Creek at culvert Pt. Lot.4, Con. 1 S.O.S., '1\JWn of vaughan V-247, Luigi Bros.. Paving (b., - Presently wrldng with staff to d:>>tain pmnit North side of Peeler !bad June 15, 1979 west of 126 Peeler !bad H\mber River watershed 11t 1979.07.l6 117 I '" O'l .. tit I 'ro: Executive Camlittee, M.T.R.C.A., 111/79 hJ en RE: 1ICnini.stration of Ontario Regulation Maxdl, April, May and June, 1979. VI - LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN City of Mississauga V-248, Edward J. Kason - F\u:ther action to be taken. Pt. Lot 17, R.P. 598 June 19, 1979 South of Dundas Street SOUtheast of Mattawa Avenue Rear of 1914 Mattawa Avenue Etobiooke Creek Watershed 'lbWn of Riclmond Hill V-249, Mr. Earl IDwe - Void. Lot 20, R.P. 202 June 26, 1979 - Violation sent to previous owner in error North side of King Sidemad - Ie-issued to Mari Construction (V-255) West of Yonge Street by about 800 feet - Staff is discussing situation. on east bank of wateroourse Huntler River Watershed. 'lbWn of Markham V-250, Mr. Heru:y J. Gertner - Staff will request soils test to be taken before any Pt. Lot 96, R.P. 2368 June 27, 1979 further consideration is given to the applicant for Parts 12-13, Plan 64~5979 &tabilization works. West of Bayview Avenue North of Proctor Avenue ~ River Watershed. City of Mississauga V-253, Langvi.lle Dev. Ltd., - Staff endeavouring to have matter cleared up. Pt. lot A, Cone. 1 S.O.S. June 28, 1979 Sou:th of nmdas St. East West bank of Etobiooke Creek Rear of 2150 Dundas Street East Borough of Etobiooke V-254, Plastics Canada - Filling stopped "Lot 284, R.P. ~137 June 29, 1979 - Qmer presently preparing penni.t application Mimioo Creek Watershed /It 1979.07.16 'ro: Executive Camlittee, M.T.R.C.A., 111/79 BE: ACninistration of Ontario Regulation - Man:h, April, May and June, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Town of Ric:hnDnd Hill V-255, Mari ConstnJction Ltd., -Staff is discussing situation. IDts 17-19, R.P. 202 JW1e 29, 1979 North ~ide of King Sideroad wast of Yonge Street East bank of the wateroourse HlIJTber River Watershed. . . . o:r. 1979.07.16 tJJ I '" en en ~ 8-267 , the metropolitan toronto and region conservation authority minutes Report 112/79 EXECUTIVE COMMITTEE WEDNESDAY-AUGUST-lS-1979 112/79 - The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, August lS, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Benderson Vice Chairman Mrs. F. Gell M.J. Breen E. H.. CareS Mrs. J .A. Gardner Mrs. L. Bancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Acting Secretary-Treasurer W.A. McLean Adm. - Finance Division A. D. Harris Superintendent of Operations, CLMD J.D. Agnew Head, W/F Section, Water Resource Division B.E. Denney Planning TeChnician, Planning & policy B.E. Knox , Head, Flood Control Section, WRD J .C. Mather Planning Technician, Planning & Policy M.C. Piper The staff advised that the application of Hungry Lion Restaurant Limited baeS been withdrawn by the applicant pending preparation of additional information. BEARING Following the Rol~ Call, the meeting recessed to hold a Hearing re: Mr. Byron Karrys (Chateau Caterers Limited) Town of Markham Rouge River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Ge'l! Members M.W.B. Biggar M.J. Breen E.B. Card Mrs. i.A. Gardner Mrs. L. Bancey C.F. Kline E.V. Kolb Dr: T.H. Leith Mrs. S. Martin J.S. Scott Acting Secretary-Treasurer W.A. McLean Adm. - Historical Sites Division R.K. Cooper Adm. - Finance Division A.D. Harris Adm. - Property & Administration Division W.E. Jones Superintendent of Operations, CLMD J.D. Agnew Head, W/F Section, Water Resource Division B.E. Denney Head, Conservation' Education Section, I&ED Miss A.. Bayboe Planning TeChnician, Planning & policy B.E. Knox Head, Flood Control Section, WRD J.e. Mather Planning TeChnician, Planning & Policy M.C. Piper ,'B-268 -2- MINUTES The Minu~es of Meeting .11/79 were presented. Res. '313 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: The Minutes of Meeting '11/79, as presented, be adopted as if read. CARRIED, SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS ITS ADOPTION: 1. PROJECT C.A.-68 -A Project for the Extension of the Heart Lake Conservation Area A staff communication was presented advising that an option has been obtained to purchase approximately 15.5 ha. (38.38 acres) of land at the north-east corner of the Heart Lake Conservation Area, for the sum of $300,000,00, plus legal costs. The subject land, located at the south-west corner of the 17th Sideroad and the Heart Lake Road, is within the project boundaries of the Heart Lake Conservation Area, and consists of a variety of topography ranging from table land in the northern portion to low-lying swamp lands in the south, including two small lakes. Res. '314 Moved by: E.V. Kolb Seconded by: Mrs. J.A. Gardner , RESOLVED THAT: Project C.A.-68 - A Project for the Extension of the Heart Lake Conservation Area, be adopted; and THAT the funding for this project be derived from Authority revenues; .AND FURTHER THAT the Minister of Natural Resources be requested to approve of this project; AND FURTHER THAT the appropriate Authority officials be authorized to take whatever action is required in connection with this project, including.the execution of any necessary documents. CARRIED; SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 2. REPORT #3/79 - PERSONNEL SUB-COMMITTEE Res. '315 Moved by: E.V. Kolb Seconded by: Mrs. L. Hancey RESOLVED THAT: The Executive Committee meet in closed session to discuss Report #3/79 of the Personnel Sub-Committee. CARRIED, The Committee met in closed session. Res. .316 Moved by: E.V. Kolb Seconded by: Mrs. L. Hancey RESOLVED THAT: The Executive Committee resume its meeting in open session. CARRIED, The Meeting resumed in open session. Res. 1317 Moved by: Mrs. L. Hancey Seconded by: Dr'. T.H. Leith RESOLVED THAT: Report .3/79 of the Personnel Sub-Committee be received, approved and appended as Schedule "An of these Minutes. CARRIED, -3- B-269 3. REPORT 14/79 - MANAGEMENT STUDY REVIEW SUB-COMMITTEE Res. '318 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: The report of Hickling-Johnston Limited, entitled .Study Outline: Organizational Review - The Metropolitan Toronto and Region Conservation Authority", dated August 14, 1979, be received and appended as Schedule "B" of these Minutes~ and THAT the firm of Hickling-Johnston Limited, Management Consultants, be engaged to carry out Phase 1 of the Organizational Review Study, as set out in their proposal dated August 14, 1979, at a cost not to exceed $ll,OOO.OO, for professional services, and study expenses not to exceed $1,000.00, subject to the approval of the Province of Ontario. On a recorded vote - voting "YEA" 8 Voting "Nay. 4 M.W.H. Biggar R.G. Henderson M.J. Breen Mrs. F. Gell E.H. Card E.V. Kolb Mrs. J.A. Gardner Dr. T.H. Leith Mrs. L. Hancey C.F. Kline Mrs. S. Mart.in J.S. Scott CARRIED ~ Motion Moved by: J.S. Scott Seconded by: Mrs. L. Hancey WHEREAS at the meeting of The Metropolitan Toronto and Reg~on Conservation Authority held June 22, 1979, a commitment was made or implied that, before proceeding with the Management Study, the approval of the Authority be received; THEREFORE the Chairman be requested to call a special meeting of the Authority at the earliest possible date, as set out in the Regulations, to consider the proposed Management Study. THE MOTION WAS -------------------------------------------------- NOT CARRIED, 4. REPORT 13/79 - TENDER OPENING SUB-COMMITTEE -Proposed Erosion Control Work: 135 Canyon Avenue, City of North York (Don River Watershed) Report 13/79 of the Tender Opening Sub-Committee was presented. Res. '319 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: Report i3i79 of the Tender Opening Sub-Committee, as amended, be received and appended as Schedule "C" of these Minutes, and THAT all tenders received for the proposed Erosion Control Work at '35 Canyon Avenue, City of North York (Don River watershed), be referred to the consult- ants, Chisholm, Fleming & Associates, for their review and report, with recommendations, to the Executive Committee Meeting to be held on Wednesday, September 5, 1979. CARRIED, 5. DELEGATION OF AUTHORITY (STAGE II, MANAGEMENT IMPROVEMENT PLAN) -Section 23 Submissions for Minister's Approval The Committee reviewed a communication from Mr. R.J. Burgar, Director of the Conservation Authorities Branch, Ministry of Natural Resources, advising that under new procedures, the Regional Director of the Ministry will recommend Authority projects or programmes directly to the Minister's office, and that the Conservation Authorities Branch will no longer be involved in the review or processing of Section 23 submissions. B-270 -4- Res. 1320 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOLVED THAT: The communication received from Mr. R.J. Burgar, Director of the Conservation Authorities Branch, Ministry of Natural Resources, concer~in9 Delegation of Authority: Section 23 submissions for Minister's Approval, be received for info~ation. CARRIED; 6. JUNIOR CONSERVATIONIST AWARD PROGRAMME -Ministry of Natural Resources A communication from the Junior Conservationist Award Programme, having regard to an invitation to attend the final banquet for the programme, was withdrawn. 7. CANADIAN INSTITUTE OF FORESTRY -1979 Annual Meeting - Jasper, Alberta September 30-0ctober 4: Attendance at A communication from the Secretary-Treasurer was considered, requesting authorization for his attendance at the Canadian Institute of Forestry Annual Meeting in Jasper, Alberta, September 30th to October 4th inclusive, at an estimated cost of $500.00. Res. 1321 Moved by: J.S. Scott Seconded by: Dr. T.H. Leith RESOLVED THAT: The Secretary-Treasurer be authorized to attend the Canadian Institute of Forestry 1979 Annual Meeting in Jasper, Albert~, from September 30th to October 4th inclusive, 1979, atan estimated cost of $500.00, and BE IT FURTHER RESOLVED THAT Mr. E.V. Kolb and Mrs. F. Gell,be also authorized to attend and that their expenses in connection therewith be paid. CARRIED; 8. BLACK CREEK PIONEER VILLAGE VISITOR CENTRE -The Devonian Group of Charitable Foundations The Committee reviewed a communication received from Mr. W.G.H. RObinson, Secretary of The Devonian Group of Charitable Foundations, advising that the Devonian Group would not be making a donation towards construction of a Visitor Centre at the Black Creek Pioneer Village. Res. 1322 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The communication dated 25 July, 1979, received from The Devonian Group of Charitable Foundations, be received for information. CARRIED; 9. TOWN OF CALEDON -Tour of Authority.Lands A communication was presented advising of a proposed tour of Authority facilities by the Town of Caledon, and the Committee was advised that a tentative date of September 26, 1979 has been suggested. Res. 1323 Moved by: E. V" Kolb Seconded by: C.F. Kline RESOLVED THAT: The staff be directed to arrange a tour of Authority lands situated in the Town of Caledon for Town Councillors and Planning staff, the Executive Committee and Conservation Land Management Advisory Board of The Metropolitan Toronto and Region Conservation Authority, during September, 1979, for the purpose of viewing Authority lands and management techniques; and THAT the cost of this tour, including lunch, be borne by the Authority. CARRIED; -5- B-271 10. NATIONAL TRAILS SYMPOSIUM, DULUTH, MINNESOTA, SEPTEMBER 4-7, 1979: -Attendance at A staff communication was presented advising that the topics of sessions aDd workshops at the above-noted sYmposium will include trail design, construction and maintenance, liability of land owners, use of public lands and rights-of- way for trail development, and multiple use of trail corridors. It is anticipated that the symposium will offer a variety of approaches to the use of public lands for recreational trails. Res. '324 Moved by: Mrs. F. Gell Seconded by: E.V. Kolb RESOLVED THAT: Ms. Adele Freeman, Conservation Areas PLanner, be authorized to attend the Fifth National Trails Symposium, to be held in Duluth, Minnesota, September 4-7, 1979, and that her related expenses, in the estimated amount of $500.00 (Canadian Funds), be paid. CARRIED; ll. BLACK CREEK PIONEER VILLAGE SHELTERS -Quotation #79-38: Hydro Service A staff communication was presented advising that the following quotations have been received for the supply of equipment, material and labour required for the installation of two 100 amp services to the Black Creek Pioneer Village shelters (classroom portables) : Bolton Power Line Limited $3,l95.00 K-Line Maintenance & Construction Ltd. 4,993.75 Black & McDonald Limited 8,233.00 Thor powerline -- Res. '325 Moved by': J.S. Scott Seconded by: E.H. Card .RESOLVED THAT: The quotation received from Bolton Power Line Limited, for the supply of all equipment, material, labour, permits and inspection fees, and all necessary approvals required for the installation of two 100 amp services to the Black Creek pioneer Village shelters, in the sum of $3,l95.00, be accepted; it being the lowest quotation received. CARRIED, 12. ALBION HILLS CONSERVATION AREA -Quotation #79-37: Camp Supervisor'S Office/Residence A staff communication was presented advising that the following two quotations (of 5 invitations) have been received for the supply of all materials and work- manship necessary to construct a building for the supervision of the Albion Hills Campground. This building includes an office, as well as a residential area containing a kitchen, bathroom, living room and two bedrooms: Eric Holmes Construction .$33,415.00 Span Construction 34,640.00 Res. '326 Moved by: E.V. Kolb Seconded by: M.J. Breen RESOLVED THAT: The quotation received from Eric Holmes Construction for the supply of all materials and work required for the construction of the Camp Supervisor's office/residence at the Albion Hills Conservation Area, in the sum of $33,415.00, be accepted, it being the l~west quotation received. l3. CARRIED J FINANCIAL REPORT AND ACCOUNTS -July, 1979 Mr. Scott presented the Financial Report and Accounts for the month of July, 1979. Res. t'327 Moved by: J.S. Scott Seconded by: E.H. Card B-272 -6- RESOLVED THAT: The Financial Statement for the month of July, 1979, be received; and that payment of the Authority accounts, in the amount of $1,039,545.65, being (a) Current Expenditures - Wages & Salaries $320,988.42; Materials & Supplies $360,482.46; (b) Capital Expenditures - Wages & Salaries $36,917.29; Materials & Supplies $281,097.18; (c) Other Programmes - Wages & Salaries $38,434.86; Materials & Supplies $l,625.44, be approved. CARRIED; Res. '328 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner . RESOLVED THAT: The Meeting recess for lunch. CARRIED, THE MEETING RECONVENED AT 1:15 P.M. 14. ALBION HILLS CONSERVATION FIELD CENTRE -Quotation .79-43: Riding Lawn Mower A staff communication was presented advising that the following quotations have been received for the supply and delivery of one new 1979 riding lawn mower for the Albion Hills Conservation Field Centre: Clark Moore Motors $.4,470.14 Schomberg Ford Sales 4,908.51 Outdoor Power Equipment 4,943.58 Nobleton Farm Service 4,994.00 Res. #329 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: The quotation received from Clark Moore Motors for the supply and delivery of one new 1979 riding lawn mower, in the sum of $4,470.14, be accepted; it being the lowest quotation received. CARRIED; 15. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Carpeting A staff communication was presented advising that the following quotations have been received for the supply and installation of carpeting in the dormitory building at the Lake St. George Conservation Field Centre: Supplier Type of Carpeting Price Quoted Simpson's Indoor/Outdoor Ozite $1,963.55 Al Bender (Bender Rug Company) Town & Terrace Ozite 2,160.00 Girrard Carpeting, Stouffville Indoor/Outdoor Ozite 2,450.00 Res. 1330 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: The quotation received from Simpson's (ContractJDivision) for the supply and installation of carpeting in the dormitory building at the Lake St. George Conservation Field Centre, in the amount of $1,963.55, be accepted, it being the lowest quotation received. CARRIED; 16. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Bunk Mattresses, Pillows and Blankets A staff communication was presented advising that the following quotations have been received for the supply and delivery of 38 bunk mattresses, 36" wide x 72- long x 4" thick, foam; 38 pillows 100% cotton, chipped foam; and l6 blankets l80" x 230", for the dormitory 'building at the Lake St. George Conservation Field Centre: Supplier Price Quoted Simpson's $1,967.60 Eaton's 2,578.50 The Bay 3,745.46 , Res. '331 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: The quotation received from Simpson's (Contract Division) for the supply and delivery of 38 bunk matressess, 38 pillows and 16 blankets for the dormitory building at the Lake St. George Conservation Field Centre, in the amount of $1,967.60, be accepted; it being the lowest quotation received. CARRIED; -7- B-273 17. KORTRIGHT CENTRE FOR CONSERVATION -Quotation: Sand & Gravel for Trails A staff communication was presented advising a further 1,000 tons of stone and gravel are required for the development of trails at the Kortright Centre ~or Conse rva tion. Res. '332 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: A further 1,000 tons of stone and gravel, for the development of trails at the Kortright Centre for Conservation, be purchased from Indusmin Limited on the basis of their quotation dated May 11, 1979 and accepted at Executive Committee Meeting #6/79, held May 16, 1979. CARRIED J 18. OCCUPIERS' LIABILITY AND TRESPASS TO PROPERTY -Discussion Paper: Ministry of the Attorney General The Committee reviewed a communication from the Ministry of the Attorney General, advising of the Ministry's consideration of Authority comments made on the Discussion Paper: Occupiers' Liability and Trespass to Property forwarded to the Ministry following Meeting #8/79 of the Executive Committee. Res. *333 Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: The communication received from the Ministry of the Attorney General, dated July 17, 1979, concerning Occupiers' Liability and Trespass to Property, be received; and THAT the staff be directed to refer to the Ministry of Na~ural Resources,the advice from the Ministry of the Attorney General concerning amendments to The Conservation Authorities Act required to deal with the matter of possible employee liability to trespass actions while pursuing their responsibilities in the administration of Ontario Regulation 735/73, made pursuant to Section 27 (l) (d) of The Conservation Authorities Act. CARRIEDJ 19. DECISION OF HEARING -Hungry Lion Restaurant Limited City of Mississauga Etobicoke Creek Watershed Res. 1334 Moved by: Mrs. S. Martin Seconded by: Dr. T.H. Leith BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this l5th day of August, 1979; and THAT the application of Hungry Lion Restaurant Limited, in accordance with Ontario Regulation 735/73, for permission to construct a drive-in-drive- .. through fast oil change and lubrication centre on the flood plain of the Etobicoke Creek, as defined by the Regional Storm, on Part of Lot 'A', Concession 1, N.D.S., City of Mississauga (Etobicoke Creek watershed), be with- drawn at the request of the applicant, Mr. D. Strynadka, without prejudice, and resch~duled at a later date. DECISION OF HEARING CARRIED, 20. -Mr. Byron Karrys (Chateau Caterers Limited) Town 0 f Markham Rouge River Watershed Res. '335 Moved by: Mrs. S. Martin Seconded by: Dr. T.H. Leith BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this lSth day of August, 1979J and THAT the application of Mr. Byron Karrys (Chateau Caterers Limited), in accordance with Ontario Regulation 735/73, for permission to construct a building on the flood plain of the Rouge River, as defined in the Schedule to the Regulation, on Part of Lot ll, Concession 6, TOwn of Markham (Rouge River B-274 -8- watershed), be approved, subject to: .The building being flood-protected to the Regional Storm elevation of 571.5 feet. CAR~IED; 21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Malton Fruit Market To construct a building and parking lot in the area defined in the Schedules to the Regulation as Sheet '8 of the Mimico Creek, City of Mississauga A staff communication was presented advising that an application has been received from the Malton Fruit Market for permission to construct a building and parking lot at the above location. Res. t336 Moved by: C.F. Kline Seconded by: J,S. Scott RESOLVED THAT: The staff communication, together with the application of the Malton Fruit Market, be receivedi and THAT the application of the Malton Fruit Market for permission to construct a building and parking lot in the area as defined in the Schedule to the Regulation as being Sheet No.8 of the Mimico Creek, City of Mississauga, be approved, subject to: (a) The proposed construction being in accordance with the site plan as prepared by J. Paul Smith & Associates, Architecti (b) No fill of any kind being placed on the flood plain as defined by the Regional Stormi . (c) The application complying with all existing municipal regulations and by-laws; (d) Every effort being made to minimize silting of the creek during construction. CARRIED i 22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Borough of Scarborough To construct storm sewer energy dissipating structure on beach area of Scarborough Bluffs, west of Brimley Road (Waterfront) A staff communication was presented advising that an application has been received from the Borough of Scarborough for a permit to modify the existing storm sewer outlet adjacent to Bluffers Park Phase I at the above location. Res. t337 Moved by: M.W.H. Biggar Seconded by: J.S. Scott RESOLVED THAT: The staff communication, together with the application of the Borough of Scarborough, be received; and THAT the application of the Borough of Scarborough for a permit to construct a storm sewer energy dissipating structure on the beach area of the Scarborough Bluffs, west of Brimley Road, be approved, subject to: (a) The work being carried out in accordance with the specification drawings, (b) The Authority being notified of the start of construction. CARRIED, 23. LIGHT RAIL TRANSIT TO MALVERN -Evaluation of Alternative Alignments A staff' communication was presented advising that the Autho~ity is in receipt of Clause No.1 of Report No.lO of the Metropolitan Planning Committee, adopted without amendment by the Council of The Municipality of Metropolitan Toronto at its meeting held June 19, 1979. The report deals with a proposal for a Light Rail Transit Line linking the Scarborough Town Centre to the Malvern Community. -9- B-275 Res. '338 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The report and request of Metropolitan Council regarding nLight Rail Transit to Malvern - Evaluation of Alternative Alignments", be received, and THA~ Metropolitan Council be advised of the Authority's willingness, subject to the concurrence of the Metropolitan Parks Department, to set aside the designated Authority-owned lands for Metropolitan acquisition if and when a decision is made to construct a Light Rail Transit extension to the Malvern Community; AND FURTHER THAT the Authority be consulted regarding design criteria, under Ontario Regulation 735/73, should a decision be made to proceed with construction. CARRIED, 24. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl Don River Watershed Component -Property: The Corporation of the City of North York Res. '339 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Report (July 25, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED' -Re: Project: Interim Water and Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component - Do~ River Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.5l, Meeting No.3 - April 21, 1978 Subject Property: East of Bathurst Street, north of Sheppard Avenue OWner: The Corporation of the City of North York Area to be Acquired: 2.902 acres, more or less Reconunended Nominal consideration of $2.00, plus legal costs Purchase Price: "Included in the requirements for the above-noted project are two irregular~ shaped parcels of land, being Parts of Lots 16 and 17, Concession I, W.Y.S., and Part of Lots 28 and 29, Registered Plan 2069, City of North York, The Municipality of Metropolitan Toronto, located east of Bathurst Street, north of Sheppard Avenue, in the vicinity of Canyon Avenue. -Negotiations have been conducted with officials of the Corporation of the City of North York, and, subject to the approval of your conunittee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $2.00, plus legal costs. nI recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses in- curred incidental to the closing, for land transfer tax, legal costs and dis- bursements are to be paid. The Authority is to receive a conveyance of the lands required free from encumbrance. -The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. nFunds are available. -An application has been made to the Minister of Natural Resources for an Inspection Certificate.- 25. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l9Sl Humber River Watershed Component -Property: N. & M. Zoltay Res. 1340 Moved by: C.F. Kline Seconded by: M.W.H. Biggar B-276 -10- RESOLVED THAT: The Report (August 7, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED, liRe: Project: Interim Water & Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component - Humber River Watershed Authority: Executive Resolution No.133, Meeting No.4 - April 12, 1978 and Authority Resolution No.51, Meeting No.3 - April 21, 1978 Subject Property: 152 King Street East, Bolton OWners: N. & M. Zoltay Area to be Acquired: 1 acre, more or less Recommended $38,000.00, plus Vendors' legal costs Purchase Price: "Included in the requirements for the above-noted project is an irregular- shaped parcel of land, being Lots 26, 27 and 183, Block 1, Plan BOL-7, Town of Caledon, The Regional Municipality of Peel, located on the south side of King Street East, on the easterly edge of the Village of Bolton. Situate on the property is a one-storey, two-bedroom, insulbrick-clad frame dwelling. "Negotiations have been conducted with the owners and their solicitor, Mr. T.R. Williston of the legal firm Scharf & Williston, 103 Collier Street, Barrie, L4M lH2; and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $38,000.00, plus Vendors' legal costs, with the transaction to be completed on or before January 3l, 1980. DI recommend approval of this purChase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses in- curred incidental to the closing, for land transfer tax, legal costs and dis- bursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. BThe Administrator of the w.ater Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. BAn application has been made to the Minister of Natural Resources for an Inspection Certificate. 26. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l98l -Proposed Engineering Study: Nos.100-102 Gwendolen Crescent Vicinity, City of North York (Don River Watershed) A staff report was presented advising that as outlined in the report DErosion Control and Bank Stabilization in Metropolitan Toronto - 1979 ProgrammeD, which was approved by the Executive Committee at Meeting #15/78, remedial work is proposed to be carried out,at Nos~100-102 Gwendolen Crescent vicinity, City of North York, in 1980. Res. #341 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff be authorized to retain the firm of Andrew Brodie Associates- Inc., Consulting Engineers, to carry out an engineering study to determine the extent and causes of the erosion problem at Nos. 100-102 Gwendolen Crescent vicinity, City of North York (Don River watershed), at a cost estimated to be $4,.300.00. CARRIED; 27. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Proposed Erosion Control Work: #35 Canyon Avenue, City of North York (Don River Watershed) AWARD OF CONTRACT THIS ITEM WAS WITHDRAWN. -11- B-277 28. WATERFRONT PROJECT: 1977-1981 Etobicoke Sector - Humber Bay East Waterfront Area -Pond System: Separator Cloth. A staff communication was presented advising that quotations have been received for the supply of a separator cloth to be installed in the bed of a man-made pond being constructed in the Humber Bay East landfill site. Each supplier markets a product of identical quality. Supplier Product Price (a) Bay Mills Ltd. Nicolon Division Nicolon LD500 5.2~ sq. ft. F.O.B. Toronto (b) Terrafix Erosion Control Terratrack T24l5 5.2~ sq. ft. F.O.B. Products Inc. Milton (a) & (b) Federal Tax incl. PST extra if applic. Res. 1342 Moved by: M.W.H. Biggar Seconded by: C.F. Kline RESOLVED THAT: The quotation received from Bay Mills Limited for the supply of aNicolon LD500" for installation in the bed of a man-made pond in the Humber Bay East landfill site, at 5.2C sq.ft., F.O.B. Toronto, be accepted; CARRIEDJ 29. WATERFRONT PROJECT: 1977-1981 Etobicoke Sector - Humber Bay East Waterfront Area -Pond System: Stone A staff communication was presented advising that quotations have been received for the supply of aggregate stone material to be laid on the bed of a man-made pond at the Humber Bay East landfill site: Supplier Price (a) Highland Creek Sand and Gravel $3.35 per ton (b) Superior Sand and Gravel 3.S5 per ton (c) Consolidated Sand and Gravel 3.60 per ton (d) Dufferin Aggregates 3.20 per ton Res. '343 Moved by: C.F. Kline Seconded by: M.J. Breen . ~ RESOLVED THAT: The quotation received from Dufferin Aggregates for the supply of fine aggregate stone material, in the amount of $3.20 per ton, be accepted, it being the lowest quotation received. ~ CARRIED, 30. WATERFRONT PROJECT: 1977-1981 ". Bluffers Park Phase II -Design of Mechanical & Electrical Services A staff communication was presented advising that an estimate has been received for the cost of services required to design mechanical and electrical services at the above location. , . Res. '344 Moved by: Mrs. S. Martin Seconded by: M.W.H. Biggar RESOLVED THAT: The firm of D.E. McGregor & Associates Limited be retained to prepare the final design, contract drawings and to provide field supervision for the construction of the electrical supply and sewer and water main require- ments for Bluffers Park Phase II Boating Federation site, at an estimated upset cost of $7,000.00. CARRIED' , , . B-278 -12- NEW BUSINESS 3l. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Drapes A staff communication was presented advising that the followinq quotations have been received for the supply of material and track, and for installation of un- lined drapes in 13 bedroom windows of the dorm!tory building at the Lake St. George Conservation Field Centre: ,'f; '-: ~rice O_ted Supplier National Draperies $1,018.61 Simpson's 1,183.70 Eaton's 1,287.00 Res. 1345 Moved by: Dr. T.H. Leith Seconded by: Mrs. L. Hancey RESOLVED THAT: The quotation received from National Draperies for the supply of material, track and installation of unlined drapes in 13 bedroom windows of the dormitory building at the Lake St. George Conservation Field Centre, in the amount of $1,018.61, be accepted, it being the lowest quotation ~eceived. CARRIED, 32. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-198~ -Proposed Erosion Control Work: #35 Canyon Avenue, City of North York (Don River Watershed) - APPROVAL OF DESIGN -and- OWNER PARTICIPATION Res. t346 Moved by: M.J. Breen Seconded by: Mr s . L. HiIilcey RESOLVED THAT: The item: Interim Wate~ & Related Land Management project 1979- 1981 - Proposed Erosion Control Work: t35 Canyon Avenue, City of North York, Don River watershed (approval of design -and- owner participation) be deferred for consideration at Meeting 113/79 of the Executive Committee, to be held September 5, 1979. CARRIED, 33. CANADIAN NAT~ONAL EXHIBITION: AUTHORITY PARTICIPATION -Special Pass to Authority Facilities The proposed Special Pass to Conservation Authority facilities for distribution at the C.N.E. exhibit was discussed. Res. 1347 Moved by: Dr. T.H. Leith Seconded by: E.V. Kolb RESOLVED THAT: The Special Pass for admission to facilities of The Metropolitan Toronto and Region Conservation Authority for distribution at the Canadian National Exhibition exhibit, with the letters "C.N.E." deleted, be approved. CARRIED; AMENDMENT Moved by: Mrs. S. Martin Seconded by: M.W.H. Biggar RESOLVED THAT: The Special Pass to f.acilit.ies of '!'he Metropolitan Torontp and Region Conservation Authority be amended ~o. delete the prevlaien fo~ half-price entrance to the Black Creek Pioneer Village and the K~tright Centre 'for Conservation; and THAT entrance to these facilities be free. THE AMENDMENT WAS ----------------------------------------------- NOT CARRIEDI -l3- B-279 34. BLACK CREEK PIONEER VILLAGE -Visitor Centre Res. .348 Moved by: M.W.H. Biggar Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Staff work continue on the preparation of presentation material for the Black Creek Pioneer Village Visitor Centre, on the basis of the l4,OOO sq. ft. First Phase and on the total project; and THAT the support of The Metropolitan Toronto and Region Conservation Foundation be requested in determining possible donors. CARRIED, 35. ADJOURNMENT On Motion, the Meeting adjourned at 2:30 p.m. R. Grant Henderson W. A. McLean, Director of Planning and POlicy Chairman Acting secretary-Treasurer B-280 SCHEDULE "A" TIlE METROPOLITAN TORONTO AND REGION CONSERVATION AUmORITY REPORT '3/79 PERSONNEL SUB-COMMITTEE The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive, DOWNSVIEW, Ontario on Wednesday, August 8, 1979 commencing at 10:00 a.m. l PRESENT WERE Chairman Mrs. L. Hancey Members M. J. Breen E. V. Kolb Dr. T. H. Leith Mrs. S. Martin Authority Member J. S. Scott Authority Chairman R. G. Henderson Authority Vice-Chairman Mrs. F. Gell Acting Secretary-Treasurer W. A. McLean Administrator - Finance Division A. D. Harris mE FOLLOWING ITEMS WERE CONSIDERED:- 1) Salaries and Wages - 1980; 2) Resignation of Administrator, Finance Division; 3) Advertisment - Position - Administrator, Finance Division; 4) Appointment of Special Advisor (Kortright); 5) Appointment of Conservation Education Supervisor (Kortright); 6) Employee Benefits - Sickness Credits; 7) Appointments, transfers and/or promotions to the Full Time and Full Time Probationary Staff; 8) Uniform and Safety Boot Policy; 9) Tuition Fees - Debra L. Mosher; 10) Responding to Telephone Messages; IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS:- 1) SALARIES AND WAGES - 1980 THAT for the purpose of estimating the 1980 Preliminary Budget, an allowance of 11% on the Salary and Wage account be applied, and further THAT the staff be directed to review the rates of economic and merit adjustments. 2) RESIGNATION OF ADMINISTRATOR, FINANCE DIVISION THAT the resignation of the Administrator, Finance Division, Alan D. Harris, be accepted with regret. 3) ADVERTISMENT - POSITION - ADMINISTRATOR, FINANCE DIVISION THAT the staff be authorized and directed to advertise immediately for applicants for the position, Administrator, Finance Division. 4) APPOINTMENT OF SPECIAL ADVISOR (KORTRIGHT) THAT Mr, K. W. Strasser be appointed Special Advisor assigned to the Kortright Centre for Conservation, effective September I, 1979 at a salary as approved by the Sub-Committee under date of August 8, 1979. 5) APPOINTMENT OF CONSERVATION I EDUCATION SUPERVISOR (KORTRIGHT) .'1 THAT the position title for the Conservation Education Supervisor on Page M-6 of the Personnel Manual, be revised to read Conservation Education Supervisor (Field Centres), and B-281 Personnel Sub-Committee Meeting 113/79 Page '2 5) APPOI~IENT OF CONSERVATION EDUCATION SUPERVISOR (KORTRIGHT) (continued) THAT a job description be prepared for the Conservation Education Supervisor (Kortright) for submission to the Information & Education Advisory Board at its next meeting, and further THAT the staff be authorized and directed to advertise and fill the position of Conservation Education Supervisor (Kortright). 6) EMPLOYEE BENEFITS - SICKNESS CREDITS THAT the staff be directed to review the Authority policy having regard to Employee Benefits - Sickness Credits as per Authority Resolution '53 including the financing of the liability and report to the Executive Committee. 7) APPOINTMENTS, TRANSFERS AND/OR PROMOTIONS TO THE FULL TIME AND FULL TIME PROBATIONARY STAFF THAT the following appointments, transfers and/or promotions be made to the Full Time and Full Time Probationary Staff:- a) Appointments to the Full Time Staff Name Position Effective Date L. Bryla Secretary 1979.07.22. D. Smith Assistant Registrar 1979.06.24. A. Wickens Co-Ordinator of Recreation Programs 1979.04.29. J. MacKay Labourer 1979.04.30. U. Volker Nursery Assistant 1979.04.30. J. Tucker Development Technician 1979.05.06. D. Fuller LabOurer 1979.04.01. J. Haggart Clerk Typist 1979.05.27. b) Appointments to the Full Time Probationary Staff Name Position Effective Date C. Piper Planning Technician 1979.05.22. K. Snowden Biological Technician 1979.05.22. M. Good Cleaner 1979.07.07. R. Brooks Cleaner 1979.06.20. N. Cowey Project Engineer 1979.03.26. c) Promotions within the Full Time Staff Name Position Effective Date J. Giancola Senior Secretary 1979.04 .01. W. Kerr Labourer 1979.05.13. L. Cocking Stockroom Manager 1979.06.24. M. Giffen Assistant Works Superintendent 1979.07.30. d) Promotions within the Full Time Probationary Staff Nallle Position Effecti ve Date G. Kidd Superintendent 1979.06.24. H. McIntosh Assistant Superintendent 1979.06.24. R. Gilchrist Assistant Superintendent 1979.06.24. M. Giffen Assistant Works Superintendent 1979.01.29. 8) UNIFORM AND SAFETY BOOT POLICY THAT the revised Uniform and Safety Boot POlicy - Issue and Sale of Unifor:ms, attached as Ap'pendix #1, be approved for inclusion in the Personnel Manual. B-282 Personnel Sub-Committee Meeting 1#3/79 Page '3 9) TUITION FEES - Debra L. Mosher THAT Mrs. Debra L. Mosher be authorized to enroll in a Registered Industrial Account- ant's Course and that the tuition fees for the first year in the amount of $400.00 be paid. 10) RESPONDING TO TELEPHONE MESSAGES THAT the Secretary-Treasurer be requested to review the problem regarding the respond- ing to telephone messages by the Development Control Staff and report to the Executive Committee, Mrs. L, Hancey, Chairman w. A. McLean, Acting Secretary-Treasurer 1979.08.08, :wr ~ . ~ the metropolitan toronto and region conservation authority PAGE: D-l B-28 ~ Personnel Manual EXEQJTIVE N! Uniform and Safety Boot Policy DATE: Issue and Sale of Uniform RESOlUTION ~ Unif6rms will be available to employees for their use while on Authority duty on the recommendation of the Administrator of the Division, for the initial issue and any subsequent issues. 1) Free Issue For the purposes of this policy, Field Supervisory Staff shall include Regional Superintendents, Superintendents, Assistant Superintendents, Enforcement Officers and Safety Officer, Dam Operators, Superintendents and Assistant and Superintendent of Operations at the Black 'Creek Pioneer Village, the Supervisor, Curator, and Special Advisor of the Kortright Centre, and these categories will receive a free issue of uniforms as follows:- 1 winter uniform consisting of: 1 blazer 2 pair pants 3 dress shirts 2 ties 1 summer uniform consisting of: 1 windbreaker) wash 2 pair pants) & wear 3 light shirts) material 1 nylon parka 1 raincoat (plastic) I dress hat 1 "Tn :'Shirt 2) Half Price Issue a) Supervisory Staff Supervisory Staff, where their job function calls for a uniform and is approved by the Administrator of the Division, will be supplied the following items of clothing at 50% cost. This classification will include the categories of:- Supervisors and Assistant Supervisors and Residential Assistants and Instructors of Field Centres, Education Assistants, Gatemen (permanent), Registrar (Black Creek Pioneer Village), Lead Hands, the Building Manager II and Co-Ordindator of the Kortright Centre,.and the uniform will consist of:- 1 summer uniform consisting of: I windbreaker ) wash 2 pair pants ) & wear 3 light shirts ) material 2 ties 1 nylon or work parka 1 plastic raincoat 3 "T" Shirts B-284 c& the metropolitan toronto and region conservation authority PAGE: D-2 Personnel Manual EXEaITIVE N! (p Uniform and Safety Boot Policy DATE: Issue and Sale of Uniforms RESOWTION N! b) General 1) The following issue will be supplied, on the recommendation of the Administrator of each Divison, to all employees who by the nature of their jobs are required to wear uniforms and are employed on an ongoing basis :._ 3 pair work pants 2 shop coats 3 work shirts 1 winter cap 2 lightweight jackets 1 work parka 2 pair coveralls 3 nTn Shirts 2) The technical and administrative staff, where required by their jobs to wear a uniform, shall be able to purchase at half price the following items:- 1 nylon or work parka 1 light jacket 1 pair work pants 1 pair coverC\l1s 1 work shirt 1 "Tn Shirt 3) Part Time staff and Seasonal staff will be able to purchase at half price the following items:- 2 work pants 1 lightweight jacket 3 work shirts 1 pair of coveralls 1 winter cap 3 nT" Shirts 1 work parka 4) Special programs for those employees in the field, in Experience Programs for example, will be allowed to purchase the following items at half price:- 2 pair pants 1 light jacket 2 work shirts 3 "Tn Shirts 5) That a maxium of 2 summer caps per annum, be available to all employees entitled to uniform issue under this policy. <& the metropolitan toronto and region conseNation authority PAGE: B-28~ D-3 Personnel Manual EXEaITlVE N! (?7 Uniform and Safetv Boot Policy DATE: Issue and Sale of Uniforms RESOlUTION N! c) Safety Equipment 1) Footwear a) The Authority shall contribute 50\ of the cost to a maxium of $30.00 of one standard and one winter pair of safety footwear per employee requiring such equipment per annum, and a contribution shall be pa1d after 3 months service with the Authority. This contribution will be applicable for employees working on an ongoing basis. b) The Authority shall contribute to a maximum of $10.00 of the cost of safety footwear for other employees requiring such equipment at the discretion of the Administrators. 2) Safety Equipment Safety equipment will be supplied on the job as re<;luired. I 3) Replacement Replacement and subsequent issues of all free or shared cos~ issues of clothing and footwear are conditional on the article being no longer serviceable and the replacement is requisitioned by the the appropriate Administrator. Additional articles of clothing may be purchased by the employee at full cost, when approved by the Administrator of the appropriate Division M.nagemenl ConsulllnlS HIckling-JOhnston L.mllecl. B-286 .1S Yonge Slreel. SCHEDULE liB- Toronto. Onl.roO MSB 6'E7 Telephone (.16) 366.2811 HlcklinGdohnston August 14, 1979 Mr. G. Henderson Chairman The Metropolitan Toronto & Region Conservation Authority S Shoreham Dr ive Toronto, Ontario Dear Sir: We are pleased, following our meeting with your Executive Committee on August 8, to herewith provide a study outline for the organiutional review to be performed for the Authority. As such the outline will serve to clarify the Terms of Reference agreed to at that meeting. , This outline addresses, in full, the process which we discussed at that meeting; please note that this outline addresses definitively the first phase of the study which w~ discussed, and provides a general outline of the process which would apply for the second phase as it might be judged necessary and appropriate. This, of course, is due to the fact that the second phase details would be determined by the outcome of the first phase. In this way we will ensure that funds are not expended unnecessarily on non-productive mat(ers, and that the major part of the study is of the utmost possible relevance. We look forward to working with you and your colleagues and staff on this important project. Sincerely, ~ C. W. Birkett Partner . EDMONTON. TORONTO. OnAWA. MONTREAL · STUDY OUTLINE * ORCANIZA TIONAL REVIEW * THE METROPOLITAN TORONTO'" REGION CONSERVATION AUTHORITY * August 14, 1979 HiCklinG-JOhnSton TABLE OF CONTENTS f!e I INTRODUCTION 1 II OBJECTIVES OF THE STUDY 2 III STUDY METHODOLOGY 3 THE PROCESS 3 STUDY METHODOLOGY . . Phase I . . Phase II , IV TIMING. STAFFING AND COSTS 7 TIMING 7 STAFFING 7 COSTS 7 APPENDIX A - Resumes HICKlIl1GtJOhnston EXTERNAL ENVIRONMENT ST TEGY INFORMATION & DECISION-MAKING SYSTEMS HICkllnGdOhnSton I. I INTRODUCnON The maintenance of an effective organization is dependent upon the balance between its key elements as shown on the facing pagej this maintenance requires review and renewal in all organizations from time to time. In a world where rapid change has become the 'watchword, periodic review of organizations is virtually unavoidable. Changes of a dramatic nature have occurred in the past decade - changes in our economy, changes in our technologies, and changes in public attitudes and expectations. There is every evidence that such change will continue at an accelerated pace and this will impact upon the ability of organizations to continue to manage effectively and efficiently. As well, the changes will impact on the programs and services most organizations are able to offer the public. I The Metropolitan Toronto and Region Conservation Authority (M. T .R.C.A.) was created by an Act of the Ontario Legislature which outlines a number of responsibilities of the Authority and defines its constitution, authorities and relationships. The major provisions of the Act have been, and wiU continue to be, central to the operations of the Authority. In the two decades since the Authority was created, it has experienced significant growth in funds, in staff, and in programs. It has demonstrated an ability to react effectively to public expectations and needs, and it has carried through with its original and central mandate relative to flood control and conservation in an exemplary fashion. It has grown to meet demands and opportunities as they have arisen, and there are now questions as to its organizational suitability for the present and the years ahead. It is appropriate, given the nature of our changing times, that the Authority step back and review its organization. its operations and its management systems to ensure their continued effectiveness. and to assure itself of its continuing ability to operate efficiently. HIClClIl1G-JOhnStQn 2. D OBJECTIVES OF THE STUOY The objectives of the study are as foUows: 1. To review the organization of the Authority, its divisions and departments, including the roles and relationships of its key personnel. 2. To review current management mechanisms, inclusive of information and decision-making mechanisms and manpower planning/staffing systems. 3. To make recommendations, as' appropriate, for revisions to, or reorganization of the Authority,ls structure and systems for management. I 4. To make ancillary recommendations for amendments to support systems to improve their effectiveness and their relevance to the emerging organization. HiCklinG-JOhnston 3. m STUDY METHODOLOGY THE PROCESS Hickling-Johnston Limited professionals have extensive experience in the conduct of organizational reviews such as the one being considered by the Authority, and in the development of revised structures and systems for organizations. We are proud of our recognized ability to ensure that effective change occurs and persists as appropriate in the organizations to which we consult. We attribute our unusually high "success rate" to the process upon which we base our consulting activity; this process involves, amongst other things, the development of a working Steering Committee from within the client organization, and careful management of the Committee/consultant interface using the latest technologies in group. decision making. In this case, the Steering Committee must be representative of the major components of the organization, both Board and Staff, and must be credible to the Board if its final recommendations are to be implemented. Members of the Committee can expect to be deeply involved in the study process, with their major responsibilities being: . to ensure that the consultants conduct the study in the agreed manner; . to guide the consultants where necessary in identification of appropriate revisions or additions to the study plan; . to participate actively in making decisions relative to final recommendations; . to act as an interpreter of the recommendations where required to the Authority after the study is compieted and to gain commitment to implementation of the final recommendati~ns adopted. Our experience indicates that the combined Study Team/Steering Committee approach provides the expertise and objectivity of the "outsider" in combination with the experience and understanding of people active in the client organization - this combination results in meaningful and impJementabie recommendations. The ideal number of members 01 the HICk:llnGdOt1ns1on If. Steering Committee is seven to eight; where necessary, and as your committee has suggested, the Committee may consist of two moduJes of this number. The Steering Committee can, during the course of the study, expect to review papers repared by the consultants and participate in such meetings as are indicated in the timetable for the study. As well, Committee members can expect to participate in the making of decisions pertinent to the conduct of the study and finaJ recommendations to the Board. STUDY METHODOLOGY The study will be conducted in two Phases, each Phase having three distinct stages. Phase I The objective of this phase of the study is, in a totally detached and 'objective manner, to determine the major issues facing the Authority and to recommend to the Steering Committee what further detailed study, if any, is required by the consultants and the Steering Committee itself. Stage 1 - Problem Diagnosis In this stage, the consultants wiJJ review available data and information relative to the objectives, programs, operations and systems within the Authority. This data will be gathered in two ways - by review of existing documentation and by interview of key personnel. We anticipate that approximately twenty to twenty-five people, including representatives of the Board and senior staff, together with key external people in Government will be interviewed. The objective of these confidential and detailed interviews is to identify tile perceptions regarding issues and opportunities held by those interviewed. ' Stage 2 - Problem Synthesis Armed with the information and data gathered in Stage I, the consultants wilJ develop a review of the problems and opportunities identified, perform an analysis to propose the rationale behind these perceptions, and identify requirements for further detailed review as deemed appropriate. HICI<lInGJOhnSton ,. Stage :5 - Steering Committee Report The consultants will then prepare a full working paper to serve as an agenda for the first full meeting of the Steering Committee. The p~per wiJI contain the conclusions and recommendations of the consultants ,with respect to Phase II and will be the subject of a full day discussion by the Steering Committee. It is at this meeting that the Committ~e will make decisions with respect to how to proceed to Phase II. We would stress that, at this point in time, the Steering Committee has the option of proceeding to Phase II or of containing the study at this juncture; the latter decisions would presumably be based on the decision of the Committee that no further involvement . of consultants is required. However, it should be made clear that specific recommendations with respect to the resolution of problems that are identified will not be available at this poirU. Phase II This phase represents the major and detailed organizational realignment study, flowing from the directional guidelines of Phase I. This Phase would consist of the foJlowing three stages. Stage 1 - Detailed Problem Definition The specific areas to be investigated, as determined in Phase I would be further reviewed. The Study Team, wiU proceed, having added to itself appropriately skiUed personnel, to a detailed review of data relative to these areas. This will involve deeper probing of available information and interviewing of a number of additional personnel in order to fuJly understand organization roles, relationships, information and other support systems and manpower systems. Particular attention wUI likely be paid to staffing, costing and communication ,systems. Stage 2 - Analysis The Study Team will then perform the organizational analysis required to. define appropriate options available to achieve improvement as deemed necessary. This analysis and option definition will be the subject of a second working paper which will serve as the agenda for a second meeting of the Steering Committee. In this forum, decisions will be made with respect to the best available options for structure, systems or operations. HlCkllnGdOhnSton 6. Stage 3 - Recommendations Given the input of the Steering Committee from the previous Stage, the consultants would proceed to develop detailed recommendations, incJusive of a plan for implementation of the options chosen. This wouJd provide a draft report for review by the Steering <;:ommittee; a finaJ fuJJ day meeting would be held with the Steering Committee. This review would constitute the subject of a final Steering Committee meeting, the purpose of which would be to gain consensus of final recommendations and an implementation plan,to be presented. to the Board. HiCklinG-JOhnston _nON ""~ "",,,,1IIlI IT". 1nII1l!IITfl . '"-IIlII mwSERYATlON AUTIIllRITT - ORGANIZATIONAL REYIElI ~D WEEKS -M:IlVInU I , I. .. I. l,n I" u 1& II. I,n " I,. I,. ,. PHASE I Stage 1- Problm Diagnosis ~ - Stage 2- ProbleD1 Synthesis - Stage 3- Report "-- -- !!!m..!! 5tallll I-Detat1ed ProIlI. Definition Stallll 2-An.llys Is StqI 3-Rec:_ncIatlons - - -- ICFf EVENTS IIlIrktllll 'aper . . Steerfllll c:.afttee Iftg. . I I I HICk:lfnGdOhnston - "'Dun IIUAOIIIINT 7. IV TIMING, STAFFING AND COSTS TIMING We estimate that an elapsed time of approximately five to six weeks would be required to completion of Phase I as proposed. Completion of Phase II is more difficult to estimate in terms of the time required, but our experience would lead us to suggest that this would require an elapsed time of 12 -16 weeks. The attached schedule sets out the project milestones. Assuming approval by August 24, we anticipate being able to begin during the first week in September. STAFFING The nature of Phase I requires that it be conducted by senior and experienced professionals. We, therefore, propose that Phase I be conducted by Dr. C.W. Birkett and Mr. P.J. Irvine. Resumes for each are appended. Phase II would require the involvement of more disciplines from our professional staff, yet it is difficult to determine which professionals are most appropriate prior to the completion of Phase I. We would propose that Phase II would be under the overall direction of Messrs. Birkett and Irvine and that staff would be drawn from the firm as required to appropriately. support consulting in organization, systems, . personnel, and finance. COSTS We estimate. Phase I will cost $9,000 - $11,000 for professional fees. Expenses will be additional and will be billed to you at our cost. They should not exceed $1,000. HICI<lInGJOhnSton I. Phase II could be conducted within a maximum budget 01 $'0,000 for professional fees and $2,000 for direct expenses inclusive of consultant travel, computer time, report preparation and reproduction, etc. With the presently available information, we foreiee that this ph~se will involve realignments to organization, and to individual responsibilities and accountabili ties, plus perhaps adjustments to staffing levels. Concomitantly, it will involve recommended adjustments to paperwork and computer support systems, to align the system with tbe emerging organization and improve communications and reaction time. We do not foresee, nor have we included any budget for, revised compensation systems, the specification and selection of new computer hardware, or the design of software systems. In the unlikely event that these are necessary, a third phase might be necessary. Given this understanding, it is our view that, dependent upon the directions determined for Phase II in the first Phase, the project costs for Phase II could be less than proposed; they are unlikely to be more. HCkllna.Jonnston APPENDIX A . RESUMES HiCklinG-JOhnston @ HicklinG-Johnston CHARLES W. BIRKETT '..............nl CIMhUll,anl.. Dr. Birkett is a Partner with Hickling-Johnston Limited whose chief Interest is in the development and management 'of new administrative approaches to the provision of social ser~ices with particular emphasis in the total field of health. His competence covers the analysis of organization patterns and the developments of systems and structures to bring about change in complex sysems. He is particularly interested in dealing with the issues of professionalism and professional relationships in the social services sector. Prior to joining Hickling-Johns,ton Limited. Dr. Birkett had extensive experience in both private and' hospital emergency medical practice. As well. he has served as Medical Director of the Winthrop Laboratories Division of Sterling Drug and later as Vice-President of the same firm. Additionally. he has served as a CouncilJor for the Township of Vaughan. as a member of the Planning Board of the same Municipality. and as a Director for the Mental Retardation facility in Richmond Hill. Currently. Dr. Birkett. in addition to his position as a Partner with Hickling-Johnston Limited. is co-owner and Presid,ent of Marshview Holdings Ltd.. co-owner and Director of a small plastics manufactur- Ing firm. and a Director of Jerram Pharmaceuticals Ltd. Dr. Birkett graduated from the Faculty of Medicine. University of Toronto in 19S9. and in 1972 obtained his Master of Business Administration from York University. with emphasis in Public Administration and the behav40ural approach to problem-solving. Since joIning Hickling-Johnston Limited. Dr. Birkett has been Involved in a number of projects including: . the planning of new organizationa,1 patterns. both teaching and non-teaching hospitals; . the assessment of current organization and funding of medical educatIon; . development of information systems for community health centres; . assessment of organizational effectiveness for municipalities Inclusive of a review of services such as Homes for the Aged; . role studies for both teaching and community hospitals; @ HicklinG-Johnston . an assessment of a regional mental health facility in Nova 't.an.a..-mrnl (nn..ullolnl\ Scotia; . an assessment of non-institutional health care opportunities for a religious congregation; . an assessment of he~th service opportunities for a major voluntary, non-profit organization; . development of a paper for the Government of Ontario relative to the long-term roJe of public education in health care; . design and management of a series of conferences on the Canadian health care system for the American Medical Associa- tion; . . re-organization of the Deanery of a major Canadian medical faculty; . assessment of a university Family Practice Department; . review of emergency service at an acute treatment general hospital. .. 8 PETER. J. IRVINE HicklinG-Johnston ~Nlemen. Con",h.nl' Peter Irvine is a partner with Hickling-Johnston Limited. He specializes in general managerial matters, such as strategic planning, operational analysis, reorganization, turnar.ound and interim line management, and a11 aspects of expansion and diversification. He heads Hickling-Johnston's practice in the field of mergers, acquisi- tions, and divestitures. He has served as chief executive officer of a number of companies in Canada and the U.S., and his focus is on results oriented bottom line consulting. Recently he has completed assignments involving the internal r.eorganiza tion and diversification of a leading health services company; the reorganization and relocation of a major appliances multinational; the turnaround management of a financially troubled leather goods manufacturer; the evaluation for sale of a wood products manufacturer; the submission of a public offering for all of the outstanding shares of Canada's leading computer services compa- nYi and the reorganization of a $100 miUion U.S. food subsidiary of one of Canada's largest companies. His background includes early experience in marketing, manufac- turing and engineering management. In his consulting career, clients have often asked him to "take over" for them during periods of change. Positions he has held are: . Corporate Planning Manager (building materials) . Assistant General Manager (communications machine- ry) . General Manager (concrete products) . Executive Vice President (industrial equipment) . Executive Vice President (fiberglass) . President (apparel) . Chairman (leather goods) . Chairman (recreational vehicles). He is the author of a series of articles on acquisition for Executive Magazine, and is a contributing business writer for the Financial Post. He holds a Bachelors degree in Industrial Engineering and a Masters degree in Business Administration from the University of Toronto. He bas an Honorarium from York University for lecturing in corporation finance and administrative policy. He is a member of the Association of Professional Engineers of Ontario, serves on the Council of the Institute of Management Consultants of Ontario, and is President of Kimbermount Consultants Limited. B-287 SCHEDULE .C. THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY REPORT '3/79 of the TENDER OPENING SUB-COMMITTEE The Tender Opening Sub-Committee met at the Authority Office, 5 Shoreham Drive, Downsview on Wednesday, July 25, 1979, commencing at 9.30 a.m., to consider tenders for the proposed Erosion Control Work at 35 Canyon Avenue, City of North York, Don River Watershed. PRESENT WERE: Chairman R. G. HendeJ::son Vice-Chairman Mrs. F. Gell Chairman, Flood Control & J. S. Scott Water Conservation Advisory Board Chairman, Don valley Mrs. L. Hancey Advisory Board Chisholm, Fleming & Assoc. T. Rohacek Staff Secretary-Treasurer K. G. Higgs Head, Flood Control Section J. C. Mather Operations & Maintenance R. W. Dewell Supervisor, Flood Control Section The Committee was advised that twenty-two sets of documents were taken out by contractors and seven tenders received, as follows: CONTRACTOR TOTAL TENDER Cucci Construction Limited $174,670.00 Alcan-Colony Limited 132,421. 20 Disher-Farrand Limited 192,345.00 Bruce S. Evans Limited 232,497.00 Loy Savina Limited 226,797.00 Gazzola Construction Limited 131,201.85 Evans Contracting Limited l63,625.00 IT WAS AGREED, AND THE COMMITTEE RECOMMENDS THAT: All tenders received for the proposed Erosion Control Work at 35 Canyon Avenue, City of North York, Don River WaterShed, be referred to the Consultants, Chisholm, Fleming arid Associates, for their review and report, with recommendations to the Executive Committee Meeting to be held on Wednesday, September 5, 1979. R. G. Henderson K. G. Higgs Chairman Secretary-Treasurer 1979.08.09 JCM/fn ~ B-288 , . the metropolitan toronto and region conservation authority minutes Report 113/79 EXECUTIVE COMMITTEE WEDNESDAY-SEPTEMBER-5-l979 113/79 The Executive Committee met at the Authority Office, 5 Shoreham'Drive, Downsview, on Wednesday, August 15, 1979, commencing at 10:00 a.m. RE: HEARING - Mr. Sheldon Harris Town of Caledon Humber River Watershed Mr. J.W. Maletich, Development Co-ordinator, advised the members that neither Mr. Sheldon Harris nor his representative was present for the Hearing. In connection with Section 27 (2a) of The Conservation Authorities Act, a Notice of Hearinq had been sent, by registered mail, to Mr. Harris. The notice advised the applicant that if he did not attend the Hearing, the Executive Committee of The Metropolitan Toronto and Region Conservation Authority may proceed in his absence and he would not be entitled to any further notice in the proceedings. Res. '349 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Hearing, under Section 27 (2a) of The Conservation Authorities Act, in respect of Mr. Sheldon Harris, Town of Caledon, Humber River Watershed, scheduled to be held Wednesday, September 5, 1979, be deferred sine die. CAJUUED, PRESENT FOR THE MEETING Chairman R. Grant Henderson Members M.W.H. Biggar M.J. Breen E.B. Card (For Mrs. J.A. GariIner) R. Fitzpatrick Mrs. L. Hancey C.P. Kline Dr. T.B. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.E. COOper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Research Planner, Planning & Policy Mrs. A.C. Deans Development Co-~rdinator, Planning & Policy J . W. Maletich Supervisor, Property Administration, P&AD D.J. Prince ABSENT WERE Vice Chairman Mrs. F. Gell Members Mrs. J. A. Gardner E.V. Kolb MINUTES The Minutes of Meeting 112/79 were presented. Res. 11350 Moved by: C.F. Kline Seconded by: E.B. Card RESOLVED THAT: The Minutes of Meeting 112/79, as presented, be adopted as i.f read. CARRIED, B-289 -2- SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY. SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 1. REPORT #4/79 - PERSONNEL SUB-COMMITTEE Mrs. Hancey presented Report #4/79 of the Personnel Sub-Committee. Res. #351 Moved by: Mrs. L. Hancey Seconded by: MrS. S. Mitrtin RESOLVED THAT: Report #4/79 of the Personnel Sub-Committee be received, approved and appended as Schedule nAn of these Minutes. CARRIED; 2. STREAM CONSERVATION SYMPOSIUM, TRENTON, ONT., SEPTEMBER 7-9, 1979 -Attendance at A staff communication was presented advising that the above symposium will include workshops on the use of natural materials for stabilizing stream banks, providing in stream fish cover and enhancing the spawning beds for natural trout populations. These subjects will have direct application to the Authority's erosion control and stream enhancement programme. Res. #352 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: Mr. Gary Wilkins, Field Supervisor, Conservation Land Management Division, be authorized to attend the Stream Conservation symposium, to be held in Trenton, Ontario september 7-9, 1979, and that his related expenses, in the estimated amount of $120.00, be paid. CARRIED; 3. REGISTERED INDUSTRIAL ACCOUNTANT'S COURSE -Request for Assistance, Mrs. D.L. Mosher: Increase in Fees A staff communication was presented advising that Report 13/79 of the Personnel Sub-Committee recommended to Executive Committee Meeting 112/79 approval of enrollment by Mrs. D.L. Mosher in a Registered Industrial Account- ant's course and payment of the first year's tuition fees in the amount of $400.00. The amount of the tuition fee has recently been increased to $480.00. Res. #353 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The amount of $80.00, representing an increase in the $400.00 first year tuition fee for enrollment of Mrs. D.L. Mosher in a Registered Industrial Accountant's course - as approved at Executive Committee Meeting ,l2/79 - be paid. CARRIED; 4. BLACK CREEK PIONEER VILLAGE -Inclusion in 1980 Exxon Travel Club Discount Coupon Booklet A staff communication was presented advising that the Black Creek pioneer Village has been selected as one of about twenty attractions in Canada to participate in the Exxon Travel Club coupon booklet. Res. #354 Moved,by: M.W.H. Biggar Seconded by: M.J. Breen RESOLVED THAT: Black Creek Pioneer Village be included in the 1980 ~on Travel Club discount booklet for the year 1980, and the discount on the fanlily -3- B-290 pntrance fee be $200 (a reduction from $7.00 to $5.00), and the senior citizen fee be 50C (a reduction from $1.59 to $1.00). CARRIED, 5. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Kitchen Equipment - Utensils A staff communication was presented advising that the following quotations have been received for the supply and delivery of small kitchen equipment for Lake S't. George Conservation Field Centre: J & F Distributors $1,594.29 Superior Restaurant & Hotel Supplies $1,687.10 Dinetz Restaurant Equipment $1,847.70 Res. 1355 Moved by: J.S. Scott Seconded by: Dx:. T.H. Leith RESOLVED THAT: The quotation received from J & F Distributors for the' supply and delivery of small kitchen equipment for the Lake St. George Conservation Field Centre, in the amount of $1,594.29, be accepted; it being the lowest quotation received. CAlUUED, 6. HURRICANE HAZEL 25TH ANNIVERSARY -Programme Planning Committee: Appointment of A communication was presented advising that included in the 1979 Community and Staff Relations Programme, adopted by the Executive Committee at Meeting .3/79 (Report 11/79 of the Information & Education Advisory Board) was a recommend- ation that a programme be organized to highlight the 25th Anniversary of Hurricane Hazel. Res. 1356 Moved by: Mrs. L. Hancey Seconded by: E.H. Card . RESOLVED THAT: A Hurricane Hazel 25th Anniversary Planning Committee be established, and that Mr. John Downing, Dr. T.H. Leith, Mr. Jack Dunlop and Mr. J.S. Scott be asked to serve on the committee. ~ED, 7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. F. Zerucelli To relocate existing watercourse, being a tributary of the Humber River in the vicinity of Lake Wilcox, Town of Richmond Hill A staff communication was presented advising that an application has been received from Mr. Frank Zerucelli for permission to relocate an existing water- course and, subsequently, to place the fill material on the abutting property at the above location. Res. 1357 Moved by: E.H. Card Seconded by: . C.F. Kline RESOLVED THAT: The staff communication, together with the application of Mr. F. Zerucelli, be received; and THAT the application of Mr. F. Zerucelli for permission to relocate an exist- ing watercourse, being a tributary of the Humber River, in the vicinity of Lake Wilcox, Town of Richmond Hill, be approved, subject to: . (a) The proposed drainage diversion being in accordance with Drawing .7913-1, dated July, 1979, as prepared by Parhet Engineering Limited; (b) Approval to intersect with the new channel being received from the Town of Richmond Hill Engineering Department; (c) The fill from the new channel and watercourse diversion being placed only in that area as defined by Scheme 'B', as shown in red on the plan prepared by Crysler & Lathem Limited, B-291 -4- (d) Every effort being made to minimize siltation of the river during construction; ( e) All work being completed to the satisfaction of the Authority and of the T~wn of Richmond Hill Engineering Department. CARRIED, 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Borough of Etobicoke Parks & Recreation Department To place fill in the area of the Mimico Creek known as West Deane Park, located on the west side of Martin Grove Road, north of Rathburn Road A staff communication was presented advising that an application has been received from the Parks & Recreation Department of the Borough of Etobicoke for permission to place approximately 5,lOO cu. yds. of clean fill at the above loca tion . Res. #358 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with .the application of the Borough of Etobicoke Parks & Recreation Department, be received, and THAT the application of the Borough of Etobicoke Parks & Recreation Department for permiSSion to place fill in the area of the Mimico Creek known as West Deane Park, located on the west side of Martin Grove Road, north of Rathburn Road, be approved, subject to: .All fill being placed in accordance with the plan Drawing '658-28-~Ol Grid Location lE 14-2, dated June, 1979, as submitted by the Borough of Etobicoke, Parks and Recreation Services Department. CARRIED; 9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Delzor Investments Limited To realign 150 linear feet of existing West Branch of Salt Creek, City of Brampton (.Humber River Watershed) A staff communication was presented advising that an application has been received from Delzor Investments Limited for permission to realign a portion of the Salt Creek in conjunction with a proposed 84-acre residential develop- ment at the north-east corner of the Seventh Line and '15 Sideroad, City of Brampton. Res. #359 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Delzor Investments Limited, be received; and THAT the application of Delzor Investments Limited for permission to realign the Salt Creek on the West Half of Lot 16, Concession VIII, City of Brampton, Humber River watershed, be approved, subj ect to: (a) All areas disturbed due to construction being restored to the satis- faction of the Authority; (b) Every effort being made to minimize silting of the watercourse during construction; (c) All work being carried out in accordance with Drawing 112, prepared by the Kleinfeldt Group and dated June, 1979. CARRIED, 10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Baif Associates To construct a storm sewer outfall south of Weldrick Road and east of Bathurst Street, Town of Richmond Hill (Little Don River Watershed) A staff communication. was presented advising that an application has been received from Baif Associates' for permission to construct a storm sewer out- fall, including a concrete endwall, gabion-lined swale and temporary silt trap, at the above location. -5- B-292 .' . Res. #360 Moved by: E,n. Card Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Baif Associates, be received; and THA'l' the application of Baif Associates for a permi t to construct a storm sewer' outfall on Registered Block 'Q', Registered plan M-1590, Town of Richmond nill (Little Don River watershed), be approved, subject to: (a) All areas disturbed due to construction being restored to the satis- faction of the Authority; (b) Every effort being made to minimize silting of the,watercourse during construction; (c) All work being carried out in accordance with Drawing #9, as prepared ,by Marshall, Macklin, Monaghan Limited and d~ted May, 1979. CARRIED; 11. ,APPLICA'rrON FOR PERMIT UNDER ONTARIO REGULATION 735/73 Hungry Lion Restaurant Limited To construct a 'drive-in-drive-through' fast oil change and lubrication centre on the north side of Dundas Street, west of the Etobicoke Creek, City of Mississauga A staff communication was presented advising that an application has been received from Hungry Lion Restaurant Limited for permission to construct a building and parking area at the above location. Res. #361 Moved by: E.n. Card Seconded by: C.F. Kline RESOLVED THAT: The staff communication, togethe~ with the application of Hungry Lion Restaurant Limited, be received; and THAT the application of Hungry Lion Restaurant Limited for permission to con- struct a ~rive-in-drive-through' fast oil change and lubrication centre on Part of Lot 'A', Concession 1, N.D.S., Etobicoke Creek watershed, City of Mississauge, be approved, subject to: (a) All work being carried out in accordance with Drawing A-l, prepared by T.A. Eldridge and Associates, Consulting Engineers, and dated June, 1979; (b) All disturbed areas being restored to the satisfaction of the Authorityi. (c) Every effort being taken to avoid siltation discharge to the Etobicoke Creek . CARRIED; 12. APPLICA~ION FOR PERMIT UNDER ONTARIO REGULATION 735/73 L. & S. Ypelaar To construct a storage shed on Lot 4, Concession 4, City of ~ississauga (Etobicoke Creek Watershed) A staff co~nunication was presented 'advising that an application has been received from Luke and Sandrea Ypelaar for permission to construct a storage building (an addition to an existing service shop) at the above location~ Res. #362 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED TIIA'l': The staff conununication, together with the application of L. .& S. ypelaar, be received; and . THAT the application of Luke and Sandra Ypelaar for permission to construct a storage shed within an area regulated by the Authority and defined on the Flood LiJ;le l-1ap Shee.t #5 'of the Etobicoke Creek as Lot 4, Concession 4, City of Mississauga, be approved, subject to: . . (a) No fill of any kind being plac~d over the top of the bank; (b) The applicant complyi.ng with the desi.gn as shown on Drnwing fll, P.ro~ect #7935, dated July, 1979, as prepared by Ni.\strodicnsa Engineering Limited; . : . B-293 -6- (c) The applicant complying with all existing municipal by-laws and regulations. CARRIED; 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Markham To place fill in an area of the Don River adjacent to and on the northerly road allowance of John Street A staff communication was presented advising that an application has been received from the Town of Markham for permission to place fill at the above location. Res. #363 Moved by: E.H. Card. Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the Corporation of the Town of Markham, be received; and THAT the application of the Corporation of the Town of.Markham for permission to place fill within an area regulated and defined in the Schedules to Ontario Regulation 735/73 as being Sheet #16 of the Don River Watershed (Town of Markham), be approved, subject to: (a) All construction taking place in accordance with Drawing '1, File No. 457-11-Al-00469, dated May 1979, as prepared by Gore & Storrie Limited, consulting Engineers; (b) Every effort being made to minimize silting of the Don River during construction; (c) All work being completed to the satisfaction of the Authority and of the Town of Markham Engineering Department. CARRIED; 14. WATERFRONT PROJECT 1977-1981, ~CARBOROUGH SECTOR -Property: Terence Bell Res. #364 Moved by: M.J. Breen Seconded by: R. Fitzpatrick RESOLVED THAT: The Report (August 21, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; liRe: Project: Waterfront Project 1977-l98l Scarborough Sector Authority: Executive Resolution No.460, Meeting No.23 - January 21, 1976 and Authority Resolution No. 46, Meeting No.3 - April 9, 1976 Subject Property: II Dault Road Owner: Terence Be 11 Area to be Acquired: 0.142 acres, more or less Recommended Purchase Price: $5,000.00, plus Vendor's legal costs "Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being Part of Blocks 'A' and ' B ' , Registered Plan 1228 and Part of Block 'D' and Part of I-foot Reserve, Registered Plan 1538, Borough of Scarborough, The Municipality of Metropolitan Toronto, located south of Dault Road, west of Lakeside Avenue. "Negotiations have been conducted with the owner and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be $5,000.00, plus Vendor's legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and . -7- B-294 disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed th~s proposed acquisition and is in concurrence with my recommendation. nFunds are available. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate." . 15. REPORT 12/79 - FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD Report 12/79 of the Flood Control and Water Conservation A~visory Board was presented. Res. '365 Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: Report 12/79 of the Flood Control and Water Conservation Advisory Board be received; and THAT Recommendations 11 and 12, as set forth herein, be adopted: tl The 1980 Budget Estimates for the Flood Control Section, Water Resource Division, as appended as Schedule "A" of the Minutes of Meeting '2/79 of the Flood Control and Water Conservation Advisory Board, be included in the 1980 Preliminary Budget Estimates of the AuthoritYJ '2 The staff be directed to prepare a brief outlining the construction details and cost breakdown for Channel Improvements on the East Branch of the Humber River in the conununity of Oak Ridges, Town of Richmond Bill. for the approval of The Metropolitan Toronto and Region Conservation Authority, The Regional Municipality of York and the Ministry of Batural Resources. CARUEQ 16. ENHANCED TRIBUTARY MONITORING PROGRAM - MINISTRY OF THE ENVIRONMENT -Authority participation A staff communication was presented advising that the Ontario Ministry of ~e Environment has asked The Metropolitan Toronto and Region Conservation Authority for ~taff support to assist in monitoring the mouths of the Don and Humber Rivers. Res. 1366 Moved by: M.W.H. Biggar Seconded by: M.J. Breen RESOLVED THAT: The staff of The Metropolitan Toronto and Region Conservation Authority be directed to assist the Ontario Ministry of the Environment in tile "Enhanced Tributary Monitoring program" of the Don and Humber Rivers. CARRIEDI 17. S'l'ORM WATER MANAGEMENT COURSE, UNIVERSITY OF OTTAWA, OCTOBER l6-l8, 1979 -Attendance at A staff communication was presented advising that the short course being held at tile University of Ottawa is intended for the practitioner working witil municipalities, consultants and developers, and will review the state of the art of runoff control and the use of simplified and sophisticated design methods . Res. 1367 Moved by: C. F. Kline Seconded by: Dr. T.H. Leith RESOLVED THAT: Messrs. J.C. Mather and M.R. Garrett be authorized to attend a ~urse on Storm Water Management, to be held at the University of Ottawa from Cctober l6-l8, 1979 J and ~AT their total ex~enses in the estimated amount of $700.00 be paid. CARRIED ,..l'~_... 8-295 -. . -8- 0.. " _:) :.1, ,I ' , " . " , 18. NATIONAL CONFERENC~-ON 'URBAN 'EROSION &: SEo.IMENT CONTROL, ST. PAUL, MINNESOTA, OCToBER'lO-12,1979' -Attendance at ., A staff~'COllUl\unidation was presented' advising that the above-noted conference, co-hosted by the Minnesota and Wisconsin Boards of Soil and Water Conservatio~ inclydes the following: .the technology of controlling or managing soil erosion, sediment movement an~ ~~n~off on lands being disturbed for development; .working arrangements involving local governments, conservation districts, developers, builders and consultants in eros!on and sediment control programmes; .lega~,institutions, state and local statutes and ordinances for imposing erosion, sediment and run-off controls. Res. #368 Moved by: Mrs. S. Martin Seconded by: E.H. Card RESOLVED THAT: Mr. A.G. Sahabandu be authorized to attend the National 'Conference on Urban Erosion and Sediment Control in St. Paul, Minnesota, from October 10-12, 1979, and that his expenses in connection therewith, in the estimated amount of $550.00, be paid. CARRIED; 19. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -pruposed Slope Modifications: Rear of Nos.l97-20S Sweeney Drive, City of North York (Don River Watershed) A staff report was presented having regard to remedial work requir~d at the abowe location. Res._#369 Moved by: J.S. Scott Seconded by: R. Fitzpatrick RESOLVED THAT: Remedial work be carried out at the rear of Nos.197-205 Sweeney Drive in the City of North York, Don River watershed, at an estimated cost of $25,000.00; and THAT the staff be authorized to retain the firm of Acres Consulting Services Limited to provide geotechnical expertise during construction, at an estirnat~d cost of $6,500.00; AND FURTHER THAT the Ministry of Natural Resources be requested to approve this work. CARRIED; 20. INTERIM WATER & RELATED LAND, MANAGEMENT PROJECT 1979-1981 -Slope Stabilization: Nos.16-l8 Fernwood Gardens, Borough of East York (Don River Watershed) Engineering Services - Conceptual and Final Design A staff report was presented advising that as outlined in the report "Erosion Control and Bank Stabilization in Metr,opolitan Toronto - 1979 Programme", which was approved by the Executive Committee at Meeting #15/78, remedial work is proposed to be carried out at the above location. Res. #370 Moved by: C.F. Kline Seconded by: Mrs. S. Martin RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates, consulting Geotechnical Engineers, to provide conceptual and final design engineering services for slope stabilization at Nos.16-l8 Fernwood Gardens, Borough of East York (Don River watershed), at a cost estimated to be $4,750.00. CARRIED; -9- B-296 21. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Slope Stabilization: Nos. 10-14 Bruce Farm Drive, City of North York (Don River Watershed) Engineering Services - Conceptual and Final Design A staff report was presented advising that as outlined in the report nErosion Control and Bank Stabilization in Metropolitan Toronto - 1979 programme", which was approved by the Executive Committee at Me~ting '15/78, remedial work is proposed to be carried out at the above location. Res. t371 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates, Consulting Geotechnical Engineers, to provide conceptual and final design engineering services for slope stabilization at Nos. 10-14 Bruce Farm Drive, City of North York (Don River watershed), at a cost estimated to be $4,750.00. CARRIED, 22. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -proposed Erosion Control Work: No.35 Canyon Avenue, City of North York (Don River Watershed) Owner Participation -and- Design APproval A staff communication was presented having regard to proposed erosion control work at the above location. At meeting '6/79 of the Executive committee, the following resolution was adopted: nThe design for the proposed erosion control work at No.35 Canyon Avenue in the City of North York, Don River Watershed, be approved, and THAT the benefiting property owner, Mike Gold Construction Limited, be required to pay $9,000.00 and convey approximately 2.3 acres of land, as a prerequisite to carrying out remedial work." It is proposed to amend the original resolution due to problems associated with the conveyance of the 2.3 acre parcel of land. Res. 1372 Moved by: J.S. Scott Seconded by: Mrs. S. Martin RESOLVED THAT: The design for the proposed erosion control work at 135 Canyon Avenue, City of North York (Don River watershed), be approvedi and THAT the benefiting property owner, Mike Gold Construction Limited, be required to pay $9,000.00, and to provide a permanent easement over approximately 2.3 acres of land, as a prerequisite to carrying out remedial work. CARRIED, 23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -proposed Erosion Control Work: No.35 Canyon Avenue, City of North York (Don River Watershed) Contract Award -and- Engineering Services At Meeting #12/79 of the Executive Committee, Report '3/79 of the Tender Opening Sub-Committee, having regard to the above proposed work, was considered. It was resolved that tenders received be referred to the consultant for review and report, with recommendations, to Executive committee Meeting 113/'79. The consultant's report and summary of tenders was presented. Res. t373 Moved by: Mrs. S. Martin Seconded by: E.H. Card RESOLVED THAT: The firm of G~zzola Paving Limited be awarded the contract to undertake the proposed erosion control work at No.35 Canyon Avenue, City of North York (Don Rive4 watershed), at a cost of $131,201.85, as recommended by Chisholm, Fl~ing and Associates, Consulting Engineersi and THAT the firm of Chisholm, Fleming and Associates be retained to provide the necessary engineering services during construction of the proposed erosion B-297 -10- control work at No. 35 Canyon Avenue (Don River watershed), at an estimated cost of $19,800.00, as per their proposal dated April 27, 1979, AND FURTHER THAT the Ministry of Natural Resources be requested to approve thi s work. CARRIED, .14. MRS. HILDA HULL COLLECTION A staff communication was presented advising th.at the Authority has been offered the opportunity to purchase a portion of the'above-noted important collection of Canadian~facts and furnishings. Res. '374 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority proceed immediately with an application to Wintario for funds, amounting to approximately $12,000.00, to purchase a portion of the Mrs. Hilda Hull collection of Canadiana; and THAT the collection be stored at the Bl;ack Creek Pioneer viilage as soon as an agreement has been completed with Mrs. Hull. ' CARRIED, NEW BUSINESS . . 25. EXECUTIVE COMMITTEE MEETING 'l4/79 -September 1', 1979 The Chairman advised that he will be absent from at least part of the above- noted meeting. It is probable that the Vice Chairman will also be absent. In accordance with Section 16-(3) of The Conservation Authorities Act, therefore, it will be necessary for the members present at the meeting to appoint an acting chairman. 26. EXECUTIVE COMMITTEE MEETING '15/79 -October 3, 1979 Due to the scheduled date of the above-noted meeting conflicting with the 1979 Conservation Authorities' Tour, September 30-0ctober 3, it was agreed that Meeting 115/79 will be held on THURSDAY, OCTOBER 4, 1979, cOllllllencing at lO: 00 a.m. at the Authority office. 27. PERSONNEL SUB-COMMITTEE MEETING 15/79 The Personnel Sub-Committee will meet at the Authority office at 10 AM TUESDAY, SEPTEMBER l8, ],.979, to appoint the Administrator of Finance. The Chairman of the Finance Sub-Committee was requested to attend. 28. FINANCE SUB-COMMITTEE MEETING 15/79 The Finance Sub-Committee will meet at the Authority office on TUESDAY, SEPTEMBER 25, 1979, commencing at 1:30 p.m. to deal with the 1980 preliminary Budget Estimates and the 1981-l984 Multi-Year Forecast. 29. CORRESPONDENCE The Chairman advised that a letter, dated August 3l, 1979, has been received from Mrs. J. Trimmer. At Mrs. Trimmer's request, her letter will be placed on the agenda of Authority Meeting '5/79 scheduled to be held Friday, October l2, 1979. 30. ADJOURNMENT On Motion, the meeting adjourned at 12:15 p.m., September 5, 1979. R. Grant Henderson . K.G. Higgs Chairman Secretary-Treasurer -, " B-298 SCHEDULE "An PERSONNEL SUB-COMMITTEE REPORT 1/4/79 The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive, DOWNSVIEW. Ontario on Wednesday, September 5, 1979 commencing at 8:30 a.m. PRESENT WERE . Chairman Mrs. L. Hancey Members M. J. Breen Dr. T. H. Leith Mrs. S. Martin Authority Member J. S. Scott Secretary-Treasurer K. G. Higgs Director of Planning & Policy W. A. McLean Information & Education Division K. W. Strasser ABSENT WERE Member E. V. Kolb Authority Chairman R. G. Henderson Authority Vice-Chairman Mrs. .F. Gell THE FOLLOWING ITEM WAS DISCUSSED:- 1) Review of appointment of K, W. Stasser as Special Advisor, Kortright Centre for Conservation in accordance with the procedures established in the Personnel Manual and at the request of Mr. Strasser. IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS;- 1) THAT Mr. K, W. Strasser be appointed Special Advisor , assigned to the Kortright Centre for Conservation, effective October 1, 1979 at a salary as approved by the Personnel Sub-Committee at Meeting 14/79 held on September 5, 1979. Mrs, L. Hancey, Chairman K. G. Higgs, Secretary-Treasurer :wr 1979.09.05. . " 8-299 the metropolitan 1oronto and region conservation authority minutes Report tl4/79 EXECUTIVE CO~~TTEE ~DAY-SEPTEMBER-19-1979 114/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, September 19, 1979, commencing at 10:00 a.m. PRESENT FOR THE BEARING Chairman R. Grant Henderson Members (For E.V. J(olb) WIn. G. Barber Mrs. J.A. Gardner Mrs. L. Hancey Dr. 'l'.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Biggs Director of PlaIming aDd Po~icy W.A. McLean Adm. - Conservation LaDa Management Division P.B. Flood Adm. - ~"'ater Resource Division M.R. Garrett Planning Technician, pl~nn;ng & Policy Miss A. Aitken Research Planner, P1a.nn.ing & Policy Mrs. A.C. Deans Project Planner, Water Resource Division T.E. Farrell Development Co-ordinator, Planning & Policy J . W . Maletich Bead, Flood Control Section, WRD J.C. Mather Co-ordinator, Experience '79 Program Miss J .L. Rutledge HEARING Following the Roll Call, ~e ~t.ing recessed to hold a Bearing re: F. & N. Campi tell.i -&- c. 1ileeks Town of Ajax Duffin Creek Watershed Miss L. Trivelli reccriied the pxoceedings of the Hearing. PRESENT FOR THE MEET'ING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members (For E.V. J(olb) Wm. G. Barber M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Biggs Director of Planning ana Policy W.A. McLean Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Research Planner, Planning & Policy Mrs. A.C. Deans Development Co-ordinator, Planning & policy J'. W. Maletich Head, Flood Control Section., WRD J.C. Mather Co-ordinator, Experience '79 Program Miss J.L. R~tl.edge ABSENT WERE Members C.F. Kline E.V. Kolb r' B-300 -2- MINUTES The Minutes of Meeting #13/79 were pre~ented. Res. #375 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Minutes of Meeting #13/79, as presented, be adopted as if read. CARRIED, SECTION I - THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE CO~~ITTEE: 1. DECISION OF HEARING -F. & N. Campitelli -&- C. Weeks Town of Ajax Duffin Creek Watershed 'Res. #376 Moved by: J.S. Scott Seconded by: Mrs. S. Martin BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 19th day of September, 1979; and THAT the application of Fred and Nino Campitelli and Charles Weeks, in accord- ance with Ontario Regulation 735/73, for permission to construct a building on the south side of Orchard Road, Part of Lot 16, Concesison 1, Town of Ajax (Duffin Creek watershed), be approved, subject to: .The applicant incorporating in the construction of the building protective measures and structural measures to withstand depths of water up to two ( 2) meters. CA1UtIEQ; 2. ONTARIO REGULATION 735/73 -Special Meeting of Executive Committee At a recent meeting of the Executive Committee, it was suggested that a meeting of the Committee be held to deal with the concepts and terminology involved in the adopted Flood Control Plan, particularly as they affect the responsibilities of the Executive Committee in the administration of Ontario Regulation 735/73. Res. #377 Moved by: Mrs. F. Gell Seconded by: Dr. T.H. Leith RESOLVED THAT: The Executive Committee meeting to deal with the matter of the concepts and terminology involved in the adopted Flood Control Plan, particularly as they affect the responsibilities of the Executive Committee in the administration of Ontario Regulation 735/73, be scheduled for Wednesday afternoon, October 24, 1979, following the regularly scheduled meeting of that date. CAlUUED; 3. 1982 BIENNIAL CONFERENCE OF CONSERVATION AUTHORITIES -Appointment of Committee The Secretary-Treasurer presented a communication concerning commencement of preparations for the 1982. Biennial Conference of Conservation Authorities, for which The.Metropolitan Toronto and Region Conservation Authority is the host authority. Res. #378 Moved by: E.H. Card Seconded by: J.S. Scott -3- B-301 RESOLVED THAT: Having regard to the 1982 Biennial Conference of Conservation Authorities, for which The Metropolitan Toronto and Region Conservation Authority will be host authority, the following be appointed a committee to make the necessary preparations for the Conference: Chairman: Secretary-Treasurer, M.T.R.C.A. Members: Chairman, M.T.R.C.A. Vice Chairman, M.T.R.C.A. Chairman, Information & Education Advisory Boar~, M.T.R.C.A. CARRIEO, 4. EXPERIENCE '79 - PROGRAM #1609 -Final Report Miss J.L. Rutledge, Co-ordinator of the above-noted programme, presented her report. Res. #379 Moved by: Mrs. S. Martin Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The report on Experience. '79, Program '1609, be received with appreciation; and THAT the following action be taken: (a) Miss J.L. Rutledge, Co-ordinator, Experience '79 - Program '1609, be thanked for her comprehensive report, (b) copies of the report be forwarded, for information, to the Ontario Youth Secretariat and the Minister of Natural Resources; (c) the Authority thank the Province of Ontario for its sponsorship of the Experience '79 programme; and request the Province to give careful consideration to the recommendations contained in the report in planning for future Experience programmes. CAJUtIEO, 5. REPORT #5/79 - PERSONNEL SUB-CO~t!olITTEE Mrs. Hancey presented Report #5/79 of the Personnel Sub-Committee. Res. #380 Moved by: Mrs. L. Bancey Seconded by: Dr. T.B. Leith RESOLVED THAT: Report #5/79 of the Personnel Sub-Committee be received and adopted and appended as Schedule "A" of these Minutes. CAJUtIEO, 6. AUTHORITY MEETING #5/79 - OCTOBER 12, 1979 -Hurricane Hazel Slide Presentation A staff communication was presented suggesting that it might be appropriate, at the above-noted meeting, to have a slide presentation commemorating the twenty-fifth anniversary of Hurricane Hazel, which occurs on October 14, 1979. Res. #381 Moved by: Mrs. J.A. Gardner Seconded by: M.W.H. Biggar RESOLVED THAT: The Secretary-Treasurer be directed to make a slide present- ation to Meeting #5/79 of The Metropolitan Toronto and Region Conservation Authority, to be held October 12, 1979, to commemorate the Twenty-Fifth Anniversary of Hurricane Hazel on October 14, 1979. CARRIEO, 7. BRUCE'S MILL CONSERVATION AREA -Quotation: Mill Foundation A staff communication was presented advising that the following two quotations (of four invitations) have been received for the construction of a stone foundation wall for the mill at the above location: B-302 -4- C.T.M. General Contractor For the supply of all labour and materials, except the stone facing, and for the installation of the concrete block and stone on the perimeter . . . $7,800.00 Additional stone facing per square yard . . . 50.00 For the supply and installation of l' x 6: perimeter flashing . . . 500.00 Leo Veiiola For the supply of labour only for 8" concrete wall, complete with stone facing and flashing . . . $5,000.00 Additional stone facing per square yard . . . 50.00 Materials supplied by ~!.T.R.C .A., including blocks, mortar and flashing . . . 1,000.00 Res. #382 Moved by: M.W.H. Biggar Seconded by: E.H. Card RESOLVED THAT: The quotation received from Leo Veijola for the supply of labour required for the installation of the foundation for the mill at Bruce's Mill Conservation Area, in the sum of $5,000.00; and for any additional stone work at $50.00 per square yard, be accepted. CARRIED, 8. 1979 BUDGET REVISIONS -Organizational Review, Phase 1: Financing A staff communication was presented advising that approval has been received from the Province of Ontario for the above-noted study. The Province has advised that the cost of the study is eligible under Water and Related Land Management support costs at a 55% g~ant rate. Res. #383 Moved by: M.J. Breen Seconded by: E.H. Card RESOLVED THAT: The 1979 budget adjustment, in the amount of $12,000.00, in the Water and Related Land Management Programme - Water Management Regulations, to provide for the 'cost of the Organizational Review Study, as appended as Schedule "B" of these Minutes, be approved. CARRIED; 9. FINANCIAL REPORT AND ACCOUNTS -August, 1979 Mr. Scott presented the Financial Report and Accounts for the month of August, 1979. Res. #384 Moved by: J.S. Scott Seconded by: W.G. Barber RESOLVED THAT: The Financial Statement for the month of August, as amended, be received; and that the payment of the Authority accounts, in the amount of $1,070,177.94, being ( a) Current Expenditures - Wages & Salaries $318,542.11; Materials & Supplies $227,813.89; (b) Capital Expenditures - Wages & Salaries $35,554.71; Materials & Supplies $449,144.29; (c) Other Programmes - Wages' Salaries $37,419.22; Materials and Supplies $1,703.72, be approved. CAJUtIED, 10. COUNCIL OF OUTDOOR EDUCATORS OF ONTARIO - ANNUAL CONFERENCE AND RESIDENTIAL WORKSHOP, TAWINGO OUTDOOR CENTRE, HUNTSVILLE, ONT., SEPTEMBER 26-28, 1979 -Attendance at A staff communication was presented advising .that at its Meeting 110/79, the Executive Committee adopted the following resolution: "Res. #270 RESOLVED THAT: Messrs. Terry Carr, Ron Hudson, Andy Wickens, Miss Jean Wansbrough and l1iss Brenda Wright, be authorized to -5- B-303 attend the C.O.E.O. Conference and Residential Workshop at the Tawil\go Outdoor Centre, in HUl'ltsville, Ontario, September 26-28', 1979 and that their estimated expenses in the amount of $50.00 each, plus travelling costs, be paid." Since that time, Mr. David Young, Project Coordinator, Claremont Conservation Field Centre, has been invited to attend the conference and to convene sessions in the programme. Res. #385 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell RESOLVED THAT: ~1r. David Young, Project Coordinator, Claremont Conservation Field Centre, be authorized to attend the Council of Outdoor Educators of Ontario Conference and Residential Workshop at the Tawingo Outdoor Centre, Huntsville, Ontario, September 26-28, 1979; and THAT his expenses, in the estimated amount of $50.00, plus travelling costs, be paid. CARRIED; II. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Quarry Investments Limited To construct storm sewer outfall to service proposed residential subdivision east of Bathurst Street and south of Elgin Mills Road, Town of Richmond Hill (Don River Watershed) A staff communication was presented advising that an application has been received from Quarry Investments Limited for permission to construct a storm sewer outfall at the above location. Res. #386 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the application of Quarry Investments Limited, be received; and THAT the application of Quarry Investments Limited for permission to construct a storm sewer outfall on Lot 50, Concession lW, Town of Richmond Hill (Little Don River watershed), be approved, subject to: (a) All areas disturbed due to construction being restored to the satis- faction of the Authority; (b) Every effort being made to minimize silting of the watercourse during construction; (c) All work being carried out in accordance with Drawing No.640-302, prepared by R.R. Higgins & Associates Limited, dated July 6, 1979. CAJUtIED, 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Cadillac Fairview Corporation Limited & Ventro Construction Limited To alter a section of the Little Etobicoke Creek in the vicinity of Burnhamthorpe and Tomken Roads, Ci ty of Mississauga A staff communication was presented advising that an application has been received from Cadillac Fairview Corporation Limited and Ventro Construction Limited for permission to deepen and channelize the Little Etobicoke Creek at the above location. Res. i387 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the appl~cation of Cadillac Fairview Corporation Limited and Ventro Construction Limited, be received; and THAT the application of Cadillac Fairview Corporation Limited and Ventro Construction Limited, for permission to alter the Little Etobicoke Creek on Lot 7, Concession 2, N.D.S., City of Mississauga, be approved, subject to: B-304 -6- (a) All areas disturbed due to construction being restored to the satisfaction of the Authority; (b) EveFY effort being made to minimize silting of the watercourse during construction; . (c) All work being carried out in accordance with Drawings Nos. 18, 19, 21 and 23, 43 to 52, Project No.l1-73185, and Drawings Nos. 20, 44, 45 and 46, Project No.ll-77069, as prepared by Marshall, Macklin, Monaghan Limited, dated October, 1978. CARRIED, 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Cadillac Fairview Corporation Limited To alter and channelize a portion of the New Westminster Creek north of Steeles Avenue, east of Dufferin Street, Town of Vaughan (Don River Watershed) A staff communication was presented advising that an application has been received from Cadillac Fairview Corporation Limited for permission to alter and channelize part of the New Westminster Creek at the-above location. Res. #388 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the apglication of Cadillac Fairview Corporation Limited, be received; and THAT the application of Cadillac Fairview Corporation Limited for permission to alter and channelize a section of the New Westminster Creek on Lot 1, Concession 2, Town of Vaughan (Don River watershed), be approved, subject to: (a) All areas disturbed due to construction being restored to the satisfaction of the Authority, (2) Every effort being made to minimize silting of the watercourse during construction; (3) All work being carried out in accordance with Drawing No. Al-78120-G14, dated August 1979. CARRXED, 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Runnymede Development Corporation Limited To construct storm sewer outfalls into an existing creek on the east side of Dixie Road, Town of Pickering (Frenchman's Bay) A staff communication was presented advising that an application has been received from Runnymede Development Corporation Limited for permission to construct storm sewer outfalls into an existing creek at the above location. Res. #389 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the application of Runnymede Development Corporation Limited, be received; and THAT the application of Runnymede Development Corporation Limited for a permit to construct storm sewer outfalls into an existing creek on Block .U., Plan M-I039, on the east side of Dixie Road, Town of Pickering (Frenchman's Bay), be approved, subject to: (a) All work being undertaken and completed in accordance with Drawing '1, Project No.8l84-02, as prepared by M.M. Dillon Limited, Consulting Engineers and Planners, dated April 1979, and approved by the Town of Pickering Public Works Department' (b) Every effort being made to minimize silting of the watercourse during construction; (c) All work being completed to the satisfaction of the Town of pickering and The Regional Municipality of Durham7 -7- B-305 (d) All areas disturbed due to const~uction on the site being restored to the satisfaction of the Authority and of the Town of Pickering. CARRIED; 15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Adjala To reconstruct the Third Line culvert on Lot 1, Concessions 2 & 3 (Humber River Watershed) A staff communication was presented advising that an application has been received from the Town of Adjala for permission to reconstruct the Third Line Culvert at the above location. Res. #390 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with the application of the Town of Adjala, be received; and THAT the application of the Town of Adjala for permission to reconstruct the Third Line Culvert on Lot 1, Concessions 2 and 3, Town of Adjala (Humber River watershed), be approved, subject to: (a) The culverts being designed to allow flows from at least the 25-year flood to pass without obstruction; (b) The proposed river diversion, though minor, being restored with rip rap. If the broken concrete from the existing culvert is to be used, it must be properly placed to provide stability and an unobjection- able appearance; (c) Rip rap being placed upstream and downstream of the proposed culverts for a distance of at least forty feet. This rip rap must be placed on the banks and bed of the watercourse and must be preceded by a filter mat or a 6"-12" layer of crushed stone; (d) Every effort being made to minimize silting of the creek during construction, ( e) The Ministry of Natural Resources and the Ministry of Transportation and Communications being notified; ( f) All areas disturbed due to construction being restored to the satis- faction of.the Authority. CAJUtIED, 16. STORM WATER MANAGEMENT PROGRAMME A staff report was presented having regard to preparing detailed proqrammes for the Watershed Plan, as follows: Land Acquisition Programme (draft to Board Aug.23,1979) Erosion and Sediment Control Programme (draft to Bami Aug.2J,1979) Community Relations Programme Flood Control Programme Conservation Services Programme Staff originally felt that the Storm Water Management aspect could be covered generally under the Erosion Control and Flood Control Programmes; however, they now feel that this would not provide the necessary direction and prominance required by storm water management issues. Res. #391 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: The firm of The Proctor & Redfern Group be retained to prepare a programme document on Storm Water Management, which will form a part of the Authority's Watershed Plan, at a cost not to exceed $42,500.00. CARRXED, B-306 -8- 17. REPORT #2/79 - WATERFRONT ADVISORY BOARD Mr. Breen presented Report #2/79 9f the Waterfront Advisory Board. Res. #392 Moved by: Mrs. .F. Gell Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Report #2/79 of the Waterfront Advisory Board be received; and THAT the recommendations, as set forth herein, be adopted: U The 1980 Budget Estimates for the Waterfront Section, Water Resource Division, as appended as Schedule "A" of the ~1inutes of Meeting 12/79 of the Waterfront Advisory Board, be included in the 19.80 Preliminary Budget Estimates of the Authority; and THAT every effort be made to secure approval of the Supplementary Water- front Project funding. 12 The Multi-Year Forecast for the period 1981-1984 for the Waterfront Section, Water Resource Division, dated 1979.09.95, be approved in principle and included in the 1981-1984 Multi-Year Forecast of the Authority. II The Commodore and Board of Directors of the Frenchman's.Bay Yacht Club be advised that the sale of Authority-owned land at this location is con- trary to established policy; however, a long-term lease may be a reasonable alternative; and THAT the Property and Administration Division, in conjunction with the Water Resource Division, be directed to attempt to negotiate a suitable long-term lease with the Frenchman's Bay Yacht Club; the details of said lease to be presented to the Board at a future meeting. !! The 1980 Shoreline Management Priorities, as follows, be approved: (a) Eastern Beaches (brought forward from 1979) , (b) Acquisition o~ endangered propert~es; (c) Construction of shore protection at the corner of Kingsbury and Harding to stabilize the toe of the fill recently placed by the Borough of Scarborough; (d) Construction of shore protection along Guildwood Parkway. CARRIED; 18. WATERFRONT PROJECT 1977-1981 - SCARBOROUGH SECTOR: BLUFFERS PARK PHASE II -Hydro Installation A staff communication was presented advising that, under the agreement with the Boating Federation at Bluffers Park Waterfront Area that arterial servic- ing will be provided to the property line, the following quotations have been received by the Authority's consultant, D.E. McGregor & Associates Limited. TwO quotations were received of four invitations: K-Line Construction Limited $57,107.00 Cliffside Pipelayers Limited $40,420.00 Res. #393 Moved by: M.W.H. Biggar Seconded by: W.G. Barber RESOLVED THAT: The quotation of Cliffside Pipelayers Limited, for the installation of electrical services at Bluffers Park Waterfront Area, in the amount of $40,420.00, be accepted, and THAT the approval of the province of Ontario be requested. CARRIED, -9- B-307 19. DEVELOPMENT CONTROL STAFF, PLANNING & POLICY -Telephone Calls A staff pommunication was presented advising that at Meeting #12/79, the Executive Committee considered a report of the Personnel Sub-Committee which requested the Secretary-Treasurer to review the matter of response to telephone messages by the Development Control Staff, Planning, POlicy. A verbal report on the matter was presented by the Director of Planning and Policy to the Executive Committee at Meeting #13/79. The report of Mr. W.A. McLean, dated 1979.09.12 informed the Committee that a new practice has been instituted whereby the name of the staff member dealing with a specific matter appears in a prominent place in correspondence dealing therewith in order that the person who can be of the most help may be con- tacted directly. Res. #394 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The staff communication, dated 1979.09.1~, having regard to telephone calls - Development Control Staff, Planning & Policy, be received for information. CARRIED, 20. HURRICANE HAZEL TWENTY-FIFTH ANNIVERSARY -Planning Committee Meeting #1/79 The staff presented a report of Meeting #1/79 of the Hurricane Hazel TWenty- Fifth Anniversary Planning Committee. Res. #395 Moved by: Dr. T.H. Leith Seconded by: M.W.H. Biggar RESOLVED THAT: The staff be directed to proceed with the proposed Seminar on the Twenty-Fifth Anniversary of Hurricane Hazel, and that arrangements be made for it to be held in the Council Chamber, Toronto City Hall, on Wednesday, October 3, 1979, at 2:00 p.m., and THAT the Borough of Etobicoke be requested to organize an interfaith memQrial church service to be held on October 14, 1979, in the afternoon, near the memorial monument to the lost firemen (Old Mill area). CARRIED; NEW BUSINESS 21. MUNICIPAL LAW ENFORCEMENT OFFICERS' FOUNDING CONFERENCE 1979, SUDBURY, ONTARIO: SEPTEMBER 16-18, 1979 -Attendance at Res. '396 Moved by: E.H. Card Seconded by: Mrs. F. Gell RESOLVED THAT: The attendance of Mr. J.D. MacKay, Enforcement Officer, Planning & Policy, at the Municipal Law Enforcement Officers" Founding Conference 1979, ,Sudbury, Ontario, September 16-18, 1979, be authorized; and THAT his expenses in connection therewith, in the amount of $108.94, be paid. CARRIED, 22. ADJOURNMENT On Motion, the Meeting adiourned at 1:30 p.~., September 19. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer B-308 SCHEDULE "A" PERSONNEL SUB-COMMITTEE REPORT # 5/7 9 The Personnel Sub-Committee met at the Authority Office, 5 Shore ham Drive, DOWNSVIEW, Ontario on Tuesday, September 18, 1979 commencing at 10:00 a.m. PRESENT WERE Chairman Mrs. L. Hancey Members M. J. Breen E. V. Kolb Dr. T. H. Leith "Mrs. S. Martin Authority Member J. S. Scott Authority Chairman R. G. Henderson Secretary-Treasurer K. G. Higgs Director, Planning and Policy W. A. McLean ABSENT WERE Authority Vice-Chairman Mrs. F. Gell The following items were discussed:- 1) AD ointment of Administrator of Finance:- The Committee interviewed the 01 oW1ng four cand1dates for t e position of Administrator of Finance:- Mr. Paul D. Burton Mr. George A. Cox Mr. Guy Dudar Mrs. Marie Mosseau 2) Appointments, transfers and/or promotions to the Full Time and Full Time Probationary Staff; IT WAS AGREED AND THE SUB-COMMITTEE RECOMMENDS:- 1) APPOINTMENT OF ADMINISTRATOR OF FINANCE THAT Mr. Guy Dudar be appointed Administrator of Finance, effective immediately, at a salary as approved by the Personnel Sub-Committee under date of September 18, 1979. 2) APPOINT~~NTS, TRANSFERS AND/OR PROMOTIONS TO THE FULL TIME & FULL TIME PROBATIONARY STAFF THAT the following appointments, transfers and/or promotions be made to the Full Time and Full Time Probationary Staff:- a) Appointments to the Full Time Staff Wilson, L. Building Manager I July 1, 1979 Hayton, A. Project Biologist August 27, 1979 b) Promotions within the Full Time Staff King, J. Clerk Typist Sept. 30, 1979 Garland, P. Stockman Sept. 30, 1979 McClure, R. Head Stockman Sept. 30, 1979 Stoop, C. Head Gardener Sept. 30, 1979 c) Appointments to the Full Time PrObationary Staff Hayden, C. A. Secretary-Foundation August 20, 1979 Pilato, L. Senior Secretary Sept. 1, 1979 Mrs. L. Hancey, Chairman K. G. Higgs, Secretary-Treasurer -- -- ~ !a.."- 1 9 7 9 BUD GET REV I S ION S PAGE: ~ PROGRAM: Water & Related Land Management Interim Project Summary Current & Capital DATE: lQ7Q_nQ_l'l o RIG I N A L BUD GET REV I SED BUD GET Sources of Financing Sources of Financing Net Provincial ~hmiciJlal Net Provincial Municipal ACT I V I T Y Expendi tures Grant Levy Other Expenditures Grant Levy Other Current Regulations 182,500 100,371; 82,125 170,500 93,775 76,725 Organizational Review Study 12,000 6,600 5,400 fI) n = tIJ :3 t" tIJ . Ql .. Ql I w 0 \0 ~ 8-310 , the metropolitan toronto and region conservation authority minutes Reporl t15/79 EXECUTIVE COMMITTEE THURSDAY-OCTOBER-4-1979 115/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Thursday, October 4, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. P. Gell Members M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin (For Mr. M.W.H. Biggar) F.R. Perkins J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Research Planner, Planning and Policy Mrs. A.C. Deans Head, Waterfront Section, wac B.E. Denney Development Co-ordinator, Planning & Policy J . W. Maletich Enforcement Officer, Planning & Policy H.J.B. McCaffrey Senior Administrative Secretary, P'P Mrs. M. Mitchell HEARING Following the Roll Call, the meeting recessed to hold a Hearing. re: Mr. William Malamas Town of Markham Don River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin (For Mr. M.W.H. Biggar) F.R. Perkins J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and pol~cy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Adm. - Property , Administration Division W.t. Jones Research Planner, Planning and Policy Mrs. A.C. Deans . B-311 -2- PRESENT FOR THE MEETING (Contd. ) Head, Waterfront Section, WRD B.E. Denney Deve10pment Co-ordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather ABSENT WAS Member M.W.H. Biggar MINUTES The Minutes of Meeting 114/79 were presented. Res. 1397 Moved by: Mrs. F. Gel! Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Minutes of Meeting '14/79, as presented, be adopted as if read. . CARRIED, SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: 1. REPORT 15/79 FINANCE SUB-COMMITTEE Mr. Scott presented Report '5/79 of the Finance Sub-Committee. Res. 1398 Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: Report '5/79 of the Finance Sub-Committee be received and appended as Schedule "A" of these Minutes, and 'tHE EXECUTIVE COMMITTeE RECOMMENDS THAT: The 1980 Preliminary Budget Estimates, as appended as Schedule "B" of these Minutes; the 1981-1984 Multi-Year Forecast, as appended as Schedule "C" of these Minutes; and Amendment to Ontari~ Regulation 845/77 As Amended, as appended as Schedule "0" of these Minutes, be approved. CARRIED, 2. REPORT . 2/79 CONSERVATION LAND MANAGE~mNT ADVISORY BOARD Mr. Kolb presented Report '2/79 of the Con~ervation Land Management Advisory Board. Res. 1399 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: Report '2/79 of the Conservation Land Management Advisory Board be received, and ' THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Recommendation '2, as set forth' herein, be adopted: II The 1979 Budget Revisions, Water and Related Land Management - Interim Project Current (W3) (W8), as appended as Schedule "An of the Minutes of Meeting .2/79 of the Conservation Land Management Advisory Board, be approved. CARRIED, 3. APPOINTMENT OF AUTHORITY MEMBER -The Regional Municipali~Y of Peel A communtcation was presented advising that Mr. R. Skjarum has been appointed to The Metropolitan Toronto and Region Conservation Authority to replace Mr. F. Frank Bean, recently appointed Chairman of the Region. Res. 1400 Moved by: E.V. Kolb Seconded by: C.F. Kline -3- 8,..312 RESOLVED THAT: The information received from The Regional Municipality of Peel regarding the appointment of Mr. R. Skjarum as a Member of the Authority, effective September 27, 1979, be received, and THAT Mr. R. Skjarum's name be added to the list of Authority Members, and further THE EXECUTIVE COMMITTEE RECOMMENDS THAT: Mr. R. Skjarum be appointed to the Flood'Control and Water Conservation Advisory Board and to the Ebobicoke-Mimico Advisory Board, effective October 12, 1979., . CARRIED, SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF ~HE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE; 4. DECISION OF HEARING -Mr. William Malamas Town of Markham Don River Watershed Res. 1401 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner BE IT RESOLVED THAT: This Executive Committee confirm the ~ecision of the Hearing held this 4th day of October, 1979; and THAT the application of Mr. william Malamas, in accordance with Ontario .Regulation 735/73, for permission to construct a retaining wall and to place fill on the flood plain of the Don River, on Lot 13, Reference Plan '64R-5979, Town of Markham (Don River watershed), be refused for the following reason: .That the application of Mr. Malamas, as s"ubmitted, will affect the control of flooding. CARRIED' 5. BILL 162 - THE REGIONAL MUNICIPALITY OF 'DURHAM ACT, 1973 -Proposed Authority Brief A communication was presented advising that the Council of The Regional Municipality of Durham has passed a resolution to establish a committee to carry out a study of Bill 162. The Committee has set up a series of public meetings and has directed, by resolution, as follows: -That the Councils of the area municipalities, the boards of education,' the public utilities commissions, The police Commission, the conservation authorities, The Health Unit and The Children's Aid Society be invited to present written briefs to the Committee by December 5, 1979." Res. 1402 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff be directed to prepare a brief suitable for submission to The Regional Municipality of Durham in connection with their study of Bill 162, The Regional Municipali'ty of Durham Act, 1973. . CARRIED, 6. REPORT #2/79 CONSERVATION LAND MANAGEMENT ADVISORY BOARD Mr. Kolb presented Report 12/79 of the Conservation Land Management Advisory Board. Res. 1403 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: Report 12/79 of the Conservation Land Management Advisory Board be received; and THAT Recommendations '1, i3, '4, is and i6, as se~ forth herein, be approved: . B-313 -4- !! The Small Craft Programme at the Claireville Conservation Area be adopted as a programme of the Authority; and THAT the staff be directed ~o provide a Rental and Instructional Programme, AND FURTHER THAT the staff be requested to discuss with officials of The Municipality of Metropolitan Toronto Parks Department the availability of surplus canoes from the Toronto Island. !! The 1980 Budget Estimates for the Conservation Land Management Division, as amended and appended as Schedule "B" of the Minutes of Meeting 12/79 of the Conservation Land Management Advisory Board, be included in the 1980 Preliminary Budget Estimates of the Authority. !! The Multi-Year Forecast 1981-1984, as amended and appended as Schedule "C" of the Minutes of Meeting #2/79 of the Conservation Land Management Advis- ory Board, be approved, in principle, and included'in the 1981-1984 Multi- Year Forecast of the Authority. 12- The fee schedule amendments to Ontario Regulation 845/77, a regulation made under The Conservation Authorities Act, as appended as Schedule ."0" of the Minutes of Meeting #2/79 of the Conservation Land Management Advisory Board, be included in the 1980 Amendments to Ontario Regulation 845/77. '6 Authority staff be authorized to hold a public workshop, to promote the understanding of and the demand for stream enhancement works, in conjunction with the Ministry of Natural Resources. CARRIED, 7. COLD CREEK CONSERVATION AREA -Quotation: Supply of Lumber - Rifle Range Improvements . A staff communication was presented advising that the following quotations have been received for the supply of 1,200 linear feet of 6" x 8" Pressure Treated Jack Pine for the extension of the Rifle Range back stops at the Cold Creek Conservation Area: Supplier ~ Domtar Chemicals Limited $2,844.00 + P.S.T. A.F.A. Forest Products $2,832.00 + P.S.T. Hanford Lumber $2,640.00 + P.S.T. Res. 1404 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The quotation received from Hanford Lumber for the supply of 1,200 linear feet of 6" x 8" Jack Pine Pressure Treated lumber, in the sum of $2,640.00 + P.S.T., be accepted; it being the lowest quotation received. CARRIED, 8. REPORT 13/79 HISTORICAL SITES ADVISORY BOARD Report 13/79 of the Historical Sites Advisory Board was presented. Res. 1405 Moved by: Mrs, F. Gell Seconded by: F.R. Perkins RESOLVED THAT: Report 13/79 of the Historical Sites Advisory Board be received, and THAT the 1980 Preliminary Budget Estimates for the Historical sites Division, as appended as Schedule "A" of the Minutes of Meeting 13/79 of the Historic~l Sites Advisory Board, be included in the 1980 ~reliminary Budget Estimates of the Authority. CARRIED' 9. BLACK CREEK P IONEER VIL~AGE -visitor Centre A staff report was presented in connection with the proposed Visitor Centre for the Black Creek Pioneer Village. Res. '406 Moved by: Mrs. :J .A. Gardner Seconded by: F.R. Perkins . -5- B-314 RESOLVED THAT: The Chairman of The Metropolitan Toronto and Region Conservation Authority appoint a committee to meet with representatives' of the Authority's member municipalities, the Province of Ontario and The Metropolitan Toronto and Region CQnservation Foundation tQ'seek their financial support for 'the visitor Centre at the Black Creek Pioneer Village. CARRIED, 10. REPORT #2/79 INFORMATION & EDUCATION ADVISORY BOARD Dr. Leith presented Report 12/79 of the Information and Education Advisory Board. Res. #407 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Gell RESOLVED THAT: Report 12/79 of the Information and Education Advisory Board be received, and THAT Recommendations 11, 12, '3, 14 and 15, as set forth herein, be approved: n The Policy of The Metropolitan Toronto and Region Conservation Authority regarding the Community Relations Support proqram, dated September 27, 1979, as appended as Schedule nAil of the Minutes of Meeting 12/79 of the Information and Education Advisory Board, be approved. '2 The 1980 Community Relations Support Program, dated September 27, 1979, as appended as Schedule "B" of the Minutes of Meeting 12/79 of the Inform- ation and Education Advisory Board, be received and approv.ed, and THAT the staff be authorized and directed to carry out the proqram within the limits of the 1980 budget allocation. t3 The 1980 Preliminary Budget Estimates for the Information and Education DiviSion, as appended as Schedule ncn of the Minutes of Meeting 12/79 of the Information and Education Advisory Board, be included in the 1980 Preliminary Budget Estimates of the Authority. t4 The amendments to Schedule - Section 44 of Ontario Regulation 845/77, As Amended - Regulation made under The Conservation Authorities Act, as appended as Schedule "D" of the Minutes of Meeting 12/79 of the Information and Education Advisory Board, be included in the 1980 Amendments. to Ontario Regulation 845/77. '5 The Multi-Year Forecast 1981-1984, as appended as Schedule "E" of the Minutes of Meeting #2/79 of the Information and Education Advisory Board, be approved, in principle, and included in the 1981-1984 Multi-Year Fore- cast of the Authority. CARRIED, 11. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Dormitory Shell A staff communication was presented regarding construction of the shell for the second dormitory building at the Lake St. George Conservation Field ~entre. Res. 1408 Moved by: . E. V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: The contract for the construction of the shell of the second dormitory building at the Lake St. George Conservation Field Centre be awarded to Leonard Construction Company, at their quoted price of $86,500.00~ and that the award be subject to: (a) A performance bond being received by the Authority prior to the signing of the contract; . (b) The shell being completed within a twelve-fifteen week period from the date of awarding the contract. CARRIED, B-315 -6- 12. REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO The Director of Planning and Policy presented a communication advising that at Meeting #9/79, held June 27, 1979, the Executive Committee adopted the follow- ing resolution: "THAT the communication from The Honourable James A.C. Auld, Minister of Natural Resources, and the Report of the Working Group on the Mandate and Role'of the Conservation Authorities of On~arioi be received and appended to the Minutes, and THAT copies of the Minister's letter and the Report be circulated to the Authority's member municipalities for comment by August 15, 1979, AND FURTHER THAT following receipt of municipal comments, s~aff be directed to prepare a report and recommendations for consideration by the Executive Committee." The deadline for comment was subsequently extended by the Ministry, and the Authority revised its request accordingly to September 21, 1979. Res. 1409 Moved by: M.J. Breen Seconded by: Mrs. F. Gell RESOLVED THAT: The communication having regard to the Report of the working Group on the Mandate and Role of the Conservation Authorities of Ontario be received, and THAT the Executive Committee in~orm the Ministry of Natural Resources of its support of the recommendations of the Report of the Working Group on the Mandate and Role of the Conservation Authorities of Ontario, and THAT the staff report concerning the municipal responses to the Report of the Working Group be received and appended as Schedule "E" of these Minutes, and forwarded, together with copies of each municipality's individual comment, to the Ministry of Natural Resources,. AND FURTHER THAT copies of any subsequent municipal replies, received too late for inclusion in this report, also be forwarded to the Ministry. CARRIED, !!Q!!!. The Secretary-Treasurer distributed a list of the Members of the provincial Parliament in the area under the jurisdiction of the Authority. The members of the Executive Committee will advise Mrs. A.C. Deans of the names of the M.P.P's with whom they will meet to discuss the Report of the Working Group on the Mandate and Role of the Conservation Authorities of Ontario. Each member should select three or four M.P.Pls. 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Constellation Hotel Corporation Limited To undertake construction of two storm sewer outfall~ into the Mimico Creek, north of Dixon Road, east of Carlingview Drive, Borough of Etobicoke A staff communication was p~esented advising that an application has been received from Constellation Hotel Corporation Limited for permission to con- struct two storm sewer outfalls into the Mimico Creek at the above location. Res. '410 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Constellation Hotel Corporation Limi~ed, be received; and THAT the application of Constellation Hotel Corporation Limited for permission to construct two storm sewer outfalls on Lot 22, Concession III, Mimico Creek watershed, be approved, subject to: (a) All areas disturbed due to construction being restored to the satisfaction of the Authority and of the Borough of Etobi.c'oke Parks Department, -7- 8-316 (b) All approvals being received from the Borough of Etobicoke as may be required, (c) Every effort being made to minimize silting of the creek during construction. CARRIED, 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Samuel Sarick Limited To place fill on the flood plain of the Mimico Creek, Part Lot 2, Block 'E', Registered Plan 919, City of Mississauga A staff communication was presented advising that an application has been received from Samuel Sarick Limited for permission to undertake the above- noted works. Res. .411 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Samuel Sarick Limited, be received, and THAT the application of Samuel Sarick Limited for permission to place fill on the flood plain of the Mimico Creek on Lot Pt. 2, Block 'E', Registered Plan 919, City of Mississauga (Mimico Creek watershed), be approved, subject to:. . (a) The .cut and fill" principle being employed, (b) All surplus excavated material being removed from the site, (c) Site grading being in accordance with a detailed site plan which will show existing and proposed grades and the finished floo~ elevation of the building; (d) Every effort being made to 'minimize silting of the Mimico Creek during construction, (e) All work being completed to the satisfaction of the A~thority and of" the City of Mississauga. CARRIED, 15. APPLICATION FOR PERMIT UNDER OUTARIO REGULATION 735/73 M. & A. Maziarczyk To construct an addition to an existing industrial building on Jarrow Avenue, Part Lots 14 and 15, Registered Plan 728, City of Mississauga (Little Etobicoke Creek Watershed) A staff communication was presented advising that an application has been received from Martin and Armandina Maziarczyk for permission to construct a 417.21 square meter (4491 square feet) addition to an existing building at the above location. Res. 1412 Moved by: Mrs. L. Hancey S~conded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Martin and Armandina Maziarczyk, be received, and THAT the application of Martin and Armandina Maziarczyk for permission to construct an addition to an industrial building on Pt. Lot 14 and Lot 15, R.P. 728, City of Mississauga (Little Etobicoke,Creek watershed), be approved, subject to: (a) All excess fill being removed from the site immediately after completion of construction; (b) All work being carried out in accordance with Drawings lA, 2A, 3A and 4A, as prepared by Wislaw M. Wodkiewicz and dated May 5, 1979. CARRIED, . S-317 -8'- 16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Elson Miles To bqild a dam and create a pond.on Part Lot 28, Concession 5, Town of Markham (Rouge River Watershed) A staff communication was presented advising that an "application has been received from Mr. Elson Miles for permission to build an earth fill dam at the above location. Res. '413 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Elson Miles, be received, and THAT the application of Elson Miles for permission to build a dam and create a pond on Part of Lot 28, Concession 5, Town of Markham (Rouge River watershed) be approved, subject to: (a) All work being completed in accordance with plan t28-12-69 and an unnumbered site plan, both prepared by Ralph Gregg of the Agricultural Engineering Service, Ontario Ministry of Agriculture and Food, which shall form part of the permitJ (b) Every effort being made to minimize silting of the watercourse during I construction. CARRIED, 17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 N.H.D. Developments Limited To construct a storm sewer outfall into the Etobicoke Creek in the vicinity of Dixie and Derry Roads, City of Mississauga A staff communication was presented advising that an application has been received from N.H.D. Developments Limited for permission to construct a storm sewer outfall, to include an energy dissipator, gabion breakwall, sodded 9hannel and rip-rapp~ outlet at the above location. Res. 1414 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of N.B.D. Developments Limited, be receivedJ and THAT the application of N.H.D. Developments Limited for permission to construct a storm sewer outfall on Lot 10, Concession 3, E.H.S., City of Mississauga (Etobicoke Creek watershed), be approved, subject to: .All work being completed in compliance with engineering drawings DET-1, D3 and 6 as prepared by R.E. Winter and Associates Limited, and dated July, 1979. CARRIED, 18. WATERFRONT PROJECT 1977-1981, pickering/Ajax Sector -Prope~ty: Durham Board of Education Res. iUS Moved by: E.H. Card Seconded by: J.S. Scott RESOLVED THAT: The Report (September 20, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purcha~e. CARRIED, liRe: project: Waterfront project 1977-1981 Pickering/~jax Sector Authority: Executive Resolution No.460, Meeting No.23 - January 21, 1976 and Authority Resolution No.46, Meeting No.3 - April 9, 1976 Subject Property: North side of Lakeview Boulevard Owner: Durham Board of Education -9- B-318 Area to be acquired: 2.160 acres, more or less Recommended Purchase Price: Nominal consideration of $2.00, plus Vendor's legal costs "Included' in the requirements for the above-noted project is an irregularly- shaped parcel of land, being All of Block "B", Registered Plan 285, Town of Ajax, The Regional Municipality of Durham, fronting on the north side of Lakeview Boulevard, east of Pickering Beach Road. "Situated on the property is a one-storey school building. "Negotiations have been conducted with officials of the School Board and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows: The purChase price is to be the nominal consideration of $2.00, plus Vendors' legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Ministry of Natural Resources for an ; Inspection Certificate." 19. WATER AND RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control & Slope Stabilization in The Regional Municipality of York: Proposed remedial work - vicinity of the Town of Caledon and King Township Boundary Line, Cold Creek (Humber River Watershed) A staff report was presented advising that as outlined in the report "Erosion Control and Bank Stabilization in The Regional Municipalities of Peel, York and OurhRm - 1979 Programme", which was approvect by the Executive Committee at Meeting #15/78, remedial work is proposed in the vicinity of the Town of Caledon and King Township boundary line. Res. #416 Moved by: C.F. Kline Seconded by: Mrs. L. Hancey RESOLVED THAT: Erosion control work be carried out in the vicinity of the Town of Caledon and King Township boundary line, Cold Creek (Humber River watershed) , at an estimated cost of $9,300.00; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 20. INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT 1979-1981 -Proposed Monitoring Programme: Slope Instability at Nos. 10-14 Bruce Farm Drive, City of North York (Don River Watershed) A staff report was presented advising that the Authority is in receipt of a proposal from the firm Golder Associates to carry out the above-noted monitoring programme. Res. #417 Moved by: Mrs. F. Gell . Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff be authorized to retain the firm of Golder Associates, Consulting Geotechnical Engineers, to carry out a slope instability monitoring programme at the rear of Nos. 10-14 Bruce Farm Drive, City of North York (Don River watershed), at a cost estimated to be $4,750.00. CARRIED; 21. ONTARIO MUSEUM ASSOCIATION: GIFT SHOP OPERATIONS SEMINAR OCTOBER 31-NOVEMBER 1, 1979, HOLIDAY INN, BARRIE, ONTARIO -Attendance at A staff communication was presented advising that the Ontario Museum Association is holding a seminar covering museum, gift shop operations at the Holiday Inn, Barrie, Ontario, October 31-November 1, 1979. B-319 -la- Res. #418 Moved by: E.H. Card Seconded by: J.S. Scott RESOLVED THAT: Mr. N. Elliott, Superintendent of Operations, and Mr. R. Roncadin, Manager of the Gift Shop at the Black Creek Pioneer Village, be authorized to attend the Ontaro Museum Association Seminar to be" held in Barrie, Ontario, October 31st-November 1st, 1979; and THAT their expenses, in the estimated ~ount of $130.00 each, be paid. CARRIED; 22. CITY OF NORTH YORK -Request for Permanent Easement: Black Creek Valley, north of Finch Avenue A staff communication was presented advising that a request has been received from the City of North York to provide a permanent easement for storm and sanitary sewers required for a development east of the Black Creek valley, north of Finch Avenue. The proposed easement affects Authority-owned land known as Part of Lot 22, Concession IV, W.Y.S., City of North York (The Municipality of Metropolitan Toront) . Res. #419 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner i RESOLVED THAT: A permanent easement be granted to the City of North York, required for storm and sanitary sewers for a development east of the Black Creek valley, north of Finch Avenue. Said easement is shown as Part 1, Plan 64R-7911. The Authority-owned land affected is Part of Lot 22, Concession IV, W.Y.S., City of North York, The Municipality of Metropolitan Toronto. Said easement to be granted for the nominal consideration of $2.00, subject to the City of North York being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT: The appropriate Authority official~ be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 23. THE MUNICIPALITY OF METROPOLITAN TORONTO -Policy for Appointments to Boards and Commissions The Secretary-Treasurer presented a letter and report received from the Metropolitan Toronto Clerk regarding a proposed policy with respect to candidates for appointments to Boards, Commissions, etc., advising that this correspondence had been forwarded to all citizen appointees by Metropolitan Toronto to the Authority, suggesting that they respond directly. Res. #420 Moved by: E.V. Kolb Seconded by: C.r. Kline RESOLVED THAT: The communication of the Secretary-Treasurer, together with the letter and report received from the Metropolitan Toronto Clerk, having regard to a proposed policy with respect to candidates for appointments to Boards, Commissions, etc., be received for information. CARRIED, 24. ADMINISTRATIVE STAFF COMMITTEE OF THE ONTARIO CONSERVATION AUTHORITIES, PROFESSIONAL DEVELOPMENT SEMINAR: NOVEMBER 15-18, 1979, LESLIE M. . FROST NATURE CENTRE, DORSET, ONTARIO -Attendance at The Secretary-Treasurer presented a communication advising that the Administrative Staff Committee has been authorized by the Committee of Chairmen of the Conservation Authorities of Ontario to hold the above-noted seminar, and that The Metropolitan Toronto and Region Conservation Authority has been asked to make a presentation on Data Processing, Programme Budgeting and Zero Base" Budgeting. . Res. #421 Moved by: C.F. Kline Seconded by: E.H. Card RESOLVED THAT: Messrs. K.G. Higgs, Secretary-Treasurer, and G. Dudar, Finance Administrator, be authorized to attend the Professional Development Seminar, -11- B-320 sponsored by the Administrative Staff Committee of the Ontario Conservation Authorities, to be "held at the Leslie Frost Nature Centre, Dorset, Ontario, from November 15 to 18, 1979; and THAT their fees in connection therewith, in the amount of $125.00 each, be paid. CARRIED, 25. ALBION HILLS CONSERVATION AREA -Quotation #79-49: Camp Supervisor's Office/Residence: Lumber Supply A staff communication was presented advising that at Meeting #12/79, the Executive Committee considered tenders for the construction of the Camp Supervisor's office/residence at the Albion Hills Conservation Area. The staff has delayed awarding the contract to allow time to determine the feasibility of carrying out the project on the basis of hiring hourly-waged carpenters to construct the building, with the Authority to acquire the necessary building materials. The following quotations have been received for the supply and delivery of construction material: Supplier Price incl. F.S.T. No. 1 Construction Grade Spruce Cadillac Building Products Company $3,000.34 Card Building Supplies Limited $2,994.06 Custom Lumber $2,520.93 Plywood Cadillac Building Products Company $1,067.00 Card Building Supplies Limited $1,045.50 Custom Lumber $ 927.56 Exterior Siding - Pine (approx. 1700 s.f.) Cadillac Building Products Company $2,219.66 Card Building Supplies Limited $1,200.00 CUstom Lumber $1,989.00 Res. #422 Moved by: E.V. Kolb Seconded by: F.R. Perkins RESOLVED THAT: The. staff be authorized to proceed with the construction of the Albion Hills Conservation Area Camp Supervisor's Office/Residence, utilizing its own work forces, sub-contractors - where necessary - with the Authority to supply all materials; and THAT the quotation received from Custom Lumber for the supply and delivery of No.1 Construction Grade Spruce, in the sum of $2,520.93, F.S.T. included; the quotation received from Custom Lumber for the supply and delivery of plywood, in the sum of $927.56, F.S.T. included, and the quotation received from Card Building Supplies Limited for the supply and delivery of 1700 square feet of Pine Boston Channel Siding, in the sum of $1,200.00, F.S.T. included, be accepted; these being the lowest quotations received. CARRIED, NEW BUSINESS 26. HURRICANE HAZEL TWENTY-FIFTH ANNIVERSARY SEMINAR -City Hall, Toronto: October 3, 1979 Dr. Leith presented a verbal report on the Hurricane Hazel Twenty-Fifth Anniversary Seminar held in the Council Chamber, City Hall, Toronto, on Wednesday, October 3, 1979. Res. #423 Moved by: Dr. T.H. Leith Seco~ded by: C.F. Kline RESOLVED THAT: Appreciation be expressed to all p~rticipants in the Hurricane Hazel ~enty-Fifth Anniversary Seminar, held in the Council Chamber, City Hall, Toronto, on Wednesday, October 3, 1979, which was considered an outstanding success. CARRIED, B-321 -12- 27. HIGHWAY #427 EXTENSION The staff reported on their attendance at a meeting of the Council of The Regional Municipality of Peel in connection with road proposals for the Highway #427 Extension in the vicinity of the Claireville Dam and Reservoir. The Committee was advised that the Authority is in receipt of correspondence from the Clerk of The Regional Municipality of Peel advising that Regional Council will be dealing with this matter again on Thursday, November 8, 1979. 28. ADJOURNMENT On Motion, the Meeting adjourned at 1:00 p.m., Thursday, October 4. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer . . B-322 SCHEDULE nA" .' THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY FINANCE SUB-COMMITTEE REjPORT #5/79 The Finance Sub-Committee met at the Authority Office, 5 Shore ham Drive, DOWNSVIEW, Ontario, on Tuesday, September 25, 1979, commencing at 1:30 p.m. PRESENT WERE Chairman J. S. Scott Members E. H. Card Mrs. J. A. Gardner C. F. Kline Authority Chairman R. G. Henderson Authority Vice-Chairman Mrs. F. Gell Secretary-Treasurer K. G. Higgs Director of Planning & Policy W. A. McLean Administrator - Finance G. Dudar Administrator - Information & Education T. Barber Administrator - Cons. Land Man. P. Flood Administrator - Water Resource M. Garrett Administrator - Historical Sites R. Cooper Administrator - Property & Admin. w. Jones ABSENT MEMBER Member M. W. H. Biggar The following items were discussed:- 1) 1980 Preliminary Budget Estimates; 2) 1981-1984 Multi-Year Forecast; 3) Amendment to Ontario Regulation #845/77; IT WAS AGREED, AND THE SUB-COMMITTEE RECOMMENDS: 1) 1980 PRELIMINARY BUDGET ESTIMATES THAT the 1980 Preliminary Budget Estimates, as amended and appended to this report as Appendix 1, be approved. 2) 1981-1984 MULTI-YEAR FORECAST THAT the 1981-1984 Multi-Year Forecast, as amended and appended to this report as Appendix 2, be approved. 3) AMENDMENT TO ONTARIO REGULATION #845/77 THAT Ontario Regulation #845/77, regulation made under the Conservation Authorities Act, as amended and appended as Appendix 3, to be effective January 1, 1980, be approved. J. S. Scott, Chairman K. G. Higgs, Secretary-Treasurer :wr 1979.09.26. B-323 ,TO: The Chairman and Members of the Finance Sub-Committee, M.T.R.C.A. Meeting #5/79, Tuesday-September-25-l979-l:30-p.m. FROM: Mr. W.A. McLean, Director, Planning and Policy RE: 1980 PRELIMINARY BUDGET ESTIMATES AND 1981-1984 MULTI-YEAR FORECAST The 1980 Preliminary Budget Estimates and the 1981-1984 Multi-Year Forecast have been forwarded to the members of the Finance Sub-Committee for consideration at their Meeting #5/79 to be held on Tuesday, September 25, 1979 at 1:30 p.m. at the Authority Office, 5 Shoreham Drive, Downsview. 1980 PRELIMINARY BUDGET ESTIMATES The budget estimates have been prepared in accordance with the criteria for budget preparation adopted by the Executive Committee at its Meeting '8/79 held June 13, 1979. Each Division prepared its budget estimates in accordance with these criteria and the budget has been assembled and reviewed using the same criteria. The criteria established by the Executive Committee as they relate to the order of priority of Authority programs are as follows: A) 1. Studies required to complete the Water~hed Pl~n. 2. Established programs, projects and activities which contribute directly to water and related land management objectives, to prevent loss of life and minimize property damage from flooding and erosion, consistent with social, economic and environmental considerations. 3. Legal obligations and fixed costs where no reasonable alternative exists. Al Watershed Plan Studies A2 Flood Control Works Scheduled A2 Land Acquisition Flood Control A2 Flood Warning System A2 Regulation Administration . A2 Erosion Contro.l A2 Operations & Maintenance - Water Control Structures A2 Conservation Services A2 Shoreline Management A3 Administration A3 General Qperations - Insurance Office Cleaning Office Maintenance Rent , Utilities (C5) A3 Taxes Non Revenue , Insurance The preliminary budget provides for the funding of these components as per approved projects or estimated costs for 1980. B) 1. Conserve natural resources of regional significance. 2. Manage lands to produce ancillary resource and recreation benefits. B2 Operations , Maintenance - Conservation Areas Conservation Field Centres General Information Pioneer Life Black Creek Tours Kortright Centre Pioneer Village B2 community Relations Support - Conservation Information Conservation Education . B2 Conservation Areas Support B2 Waterfront Support B2 Waterfront Development B2 Headwater Acquisition Since Headwater acquisition is presently provided for in the Interim Water and Related Land Mpnagement Project it is funded in the A category but in the same amount as 1979. The 1980 budget provides for the remaining programs at either the same level as last year or with an 8~ 'increase in levy plus additional funds from user fee increases and program activities. B-32 4 Finance Sub-Committee, M.T.R.C.A. Meeting #5/79 1980 Preliminary Budget Estimates and 1981-1984 Multi-Year Forecast Page 2 . Exceptions - provision is made for $19,000 for exhibits including the C. N . E. Exhibit - an additional secretary for the Land Management Division $11,000 - Waterfront as per approved project. C) Extending or establishing new programs which contribute directly to primary objectives. C Waterfront Supplementary Project $.950,000 C Flood Control - Keating Channel $100,000 C Conservation Services - Forestry Development $ 22,000 These items are funded in projects which the Authority has adopted, but in the case of the Supplementary Waterfront Project and the Keating Channel, Provincial approval has not been given. The Supplementary Project and fores~ry development are considered established items for which administrative cost provision now exists. Administrative costs have been calculated as being 10% over and above program costs. The introduction of the Keating Channel project represents a new venture which will add to administrative costs at the approximate rate of 2% per year for a period of five years. No provision has been made in the Administrative budget for this. D) Extending or establishing new programs which contribute to ancillary objectives. D Community Relations Development - Field Centres (Lake St. George) $ 100,000 - Kortright $ 359,000 0 Conservation Areas Development - $ 126,500 D Historic Sites Development - $ 46,000 0 Land Acquisition Conservation Areas - Not funded 0 Head Office - $ 10,000 D Aquatic Park - $ 50,000 D Organizational Review Study - $ 50,000 D C.N.E. Exhibit - $ 19,000 The programs which are funded as indicated have no increase in levy over 1979. The Lake St. George Field Centre is funded from school board funds. Head Office renovation is funded from special revenues. With the exception of head office renovation costs, all programs in this category are considered to add to overall administration costs. These would accumulate at the approximate rate of 2i per year over a five year period. 1981-1984 MULTI-YEAR FORECAST The Multi-Year Forecast is based on the 1980 Preliminary Budget.Estimates and projects program costs beyond the termination dates of presently approved projects. Since projects have not yet been'developed beyond 1981, the forecasts made,represent the best estimate which can be made at this time,of the funding that programs which are being developed will require. The forecast continues to reflect an emphasis on water and related land management programs. SCHEDULE OF FEES Attached to the Preliminary Budget Estimates for 1980 is the recommended schedule of fees for 1980. The amendments to the. fee schedul~ directly affect the revenue estimates. The major changes are as follows: . Conservation Area parking fee increased from $2.00 to $2.50 per car per day . Annual Conservation Area parking permit increased from $25.00 to $30.00 per year B-325 Finance Sub-Committee, M.T.R.C.A. Meeting #5/79 1980 Preliminary Budget Estimates and 1981-1984 Multi-Year ~orecast Page 3 . Permit fee for use of Glen Haffy,Extension increased from $70.00 to $80.00 per. day . Entrance fees at Black Creek Pioneer Village: Adults - increased from $3.00 to $3.50 per day Students - increased from 75~ to $1.00 per day Family Admission - increased from $6.00 to $7.00 per day Group Admissions - increased from $2.50 to $3.00 per person . Row boat rentals at Glen Haffy increased from $2.00 to $3.00 per hour . Canoe rentals increased from $3.00 to $3.50 per hour and from $10.00 to $15.00 per day . Canoe instruction $35.00 per course per person (new) . For Campground Site - Indian Line increased from $6.00 to $7.00 per night . Weddings at Black Creek Church increased from $125.00 to $175.00 . Pioneer Craft Program and Christmas Tour increased from $2.00 to $2.50 per student . Dickson Hill School Program increased from $1.00 to $1.25 per student . Group Cross-Country Ski instruction and equipment rental $5.50, per day per person (new) . Ski Tow increased from $2.00 to $3.00 per day . Conservation Education Program: Albion Hills Conservation Field Centre increased from $495.00 to $535.00 per day Claremont Conservation Field Centre increased from $495.00 to $535.00 per day Boyd Conservation Field Centre increased from $380.00 to $405.00 per day Lake St. George - $405.00 per day (new) RECOMMENDATION: IT IS RECOMMENDED THAT the 1980 Preliminary Budget Estimates and the 1981 - 1984 Multi-Year Forecast be approved and, IT IS FURTHER RECOMMENDED THAT Ontario Regulation 845/77, Regulation made under The Conservation Authorities Act, as amende~ to be effective January 1, 1980 be adopted. THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PRE L I M I N A R Y 1 9 8 0 BUD GET EST I MAT E S OCTOBER 3, 1979 ~ :z: tIJ g t"' tIJ lIJ I II W lIJ ~ II en THE r~ROPOlITAN TORONTO AND REGION CONSERVATION AUTHORITY 1980 PRElIr1HIARY BUDGET I N D E X PAGE(S) PAGE(S) 1 - 3 Budget Report CONSERVATION & RECREATION LAND MANAGEMENT 4 Budget Summary 5 Municipal Levies 35 - 36 Conservation Areas - Support 6 , Basis of Apportionment of Municipal Levies 37 - 38b Conservation Areas - Development 39 - 40 Conservation & Niagara Escarpment Land ADMINISTRATION 41 - 42 Information & Interpretive Program 43 - 44 Rent & Utilities 7 - 8 Administration 45 - 46 Taxes & Insuranc~ OPERATIONS & MAINTENANCE WATERFRONT 9 - 10 General Operations 47 - 48 Waterfront Support 11-12 Conservation Area Operations 13 - 14 Information & Education Operations SPECIAL PROJECTS 15 - 16 Black Creek Pioneer Village 49 - 50 Waterfront Plan WATER & RELATED LAND MANAGEMENT HISTORIC SITES 17 - 18 Operations & Maintenance of Water Control Structures 19 - 20 Community Relations - Support 51 - 52 Historic Sites Development 21 - 22 Community Relations - Development 23 - 24 Taxes & Insurance FEE SCHEDULE WATER & RELATED LAND MANAGEMENT Appendix I Proposed Schedule of Fees for 1980 25 - 32 Interim Project 33 - 34 Interim Project - Supplementary - Keating Channel 1 9 8 0 1. PRELIMINARY CURRENT AND CAPITAL BUDGET ESTIMATES AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES The Metropolitan Toronto and Region Conservation Authority has adopted a program designed to further the conservation, restoration, development and management Qf the natural resources of the 1,339 square miles included in the Authority's area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the headwater areas of the Oak Ridges intcrlobate moraine, and the Niagara Escarpment as the major resources to which its programs are applied. Established resource management programs include flood control and water conservation, erosion control, waterfront devel- opment, and fish and wildlife management. In implementing these programs, 26,534 acres of land have been acquired and, in addition to their being managed for the conservation functions they perform, they are made available to the community for outdoor and conservation education, recreation and historic sites purposes. Within these comprehensive program guidelines, the Authority has, over the years, reflected the priorities and policies of the partners, the participating municipalities and the Province of Ontario as expressed through ~he representative Authority members. Since 1957, 61% of the Authority's capital and development budget has been devoted to Water and Related Land Management, 25% has been devoted to Lake Ontario Shoreline Management, 12% to Conservation and Recreation Land Management and 2% to Outdoor and Conservation Education. The 1980 budget estimates for administration, operations and maintenance, current and capital programs reflect the emphasis on Flood Control and Water Conservation, provide for the management of lands and facilities acquired and developed in connection with this program, and continue the approved Waterfront project at a reduced rate. FORMAT OF PRESENTATION These budget estimates are in accordance with the requirements of The Ministry of Natural Resources "Policy, Procedure and Information Manual for Conservation Authorities". There are five major types of Provincial grants available through the Ministry of Natural Resources to Conservation Authorities:- 1) Administration 4) Special Projects and Programs 2) Water & Related Land Management 5) Supplementary Grants (not applicable to M.T.R.C.A.) 3) Conservation & Recreation Land Management , AUTHORITY PROGRA1'fS 2. The Authority Programs in these Preliminary Budget Estimates are in seven basic categories:- 1) Administration 4) Conservation & Recreation Land Management Administration a) Conservation Areas - Support b) Conservation Areas - Development 2) Operations & Maintenance c) Cons. Area Information & Interp. Program d) Rent & Utility Services a) General Operations e) Taxes & Insurance b) Conservation Area Operations c) Information & Education Operations 5) Waterfront d) Black Creek Pioneer Village Operations Waterfront - Support 3) Water & Related Land Management a) Operations & Maintenance of Water Control Structures 6) Special Projects b) Community Relations - Support Waterfront Plan c) Community Relations - Development d) Taxes & Insurance 7) Historic Sites e) Interim Water & Related Land Man.-Current & Capital f) Interim Water & Related Lal'ld-.Man.-Keating Channel Histo~ic Sites Development Expenditures on administration, ope~atlons and maintenance and current programs comprise the Authority's General Levy on all participating municipalities apportioned on the basis of equalized assessment as supplied by the Province of Ontario. Expenditures on capital programs are financed as a Capital Levy on municipalities based on levies designated in the specif- ic projects. INTERIM WATER & RELATED LAND MANAGElmNT PROJECT The year 1980 is the second year of the three year Interim Water & Related Land Management Project. This project enables the Authority to establish and undertake a program designed to conserve, restore, develop and manage the natural resources of the watersheds within the area of its jurisdiction. in accordance with the Water and Related Land Management Plan. It is the intention that this Project. together with ongoing works which were initiated under earlier approved projects. shall form a single. consolidated Project. Originally the Project provided for total expenditures of $3,800,000 in each of the three year 1979, 1980 and 1981. Due to cash flow limitations from the Province. the 1979 budget provided for expenditures of $3.598.963 and the attached prelimin- ary budget provides for expenditures of $3,692,800. WATERFRONT PROJECT 3. In 1977, the Authority commenced the second phase of the Waterfront Project. Originally this phase proposed expenditures of $4,400,000 per year over the five year period 1977-1981. Expenditures for 1977 were $2.876,482 and in 1978 $11,486,993 (including $8,500,000 for the acquisition of the Guild Inn). Metropolitan Toronto agreed to increase their share of the levy for this project by $496,000 each year for 1979, 1980 and 1981. Due to cash flow limitations from the Province, the $496,000 matching grant was not available in 1979. The 1980 preliminary budget provides for estimated expenditures of $2,138,250 plus $992,000 for the supplementary project. In , addition. it is proposed to levy an amount of ~185,408 in 1980 to cover deficit in levy for the years 1977, 1978 and 1979. This amount is within the project authorization. THE 1980 LEVY The preliminary apportionment of the 1980 municipal levies is based on the latest equalized assessment figures available to the Authority (1977 assessment data for 1978 taxation purposes) as supplied by the Province of Ontario. These pre- liminary apportionments are subject to revision when current figures are available from the Province- In accordance with the policy adopted by the Authority, the Regional Municipalities of Durham, Peel and York will be levied an amount equal to 100% of the 1979 taxes paid by the Authority for revenue producing conservation areas within those municipalities. Within Metropolitan Toronto, Authority lands are not subject to taxation. (For preliminary budget purposes the 1979 taxes have been estimated, based on 1978 taxes, plus 9%). PROVINCIAL FUNDING The Provincial grant structure used in these estimates is:- Administration 50% Water & Related Land Management 55% Conservation & Recreation Land Management 50% Waterfront Plan 50% The estimates provide for the following increases (decreases) in Provincial Grant:- Administration: 8% over the 1979 grant plus additional grant ($25,000) for Phase II of the Management Study. Water & Related Land Mana~ement: Increases of $80,608 to cover increased costs in the general Water and Land Management activities, ~23,155 for t e Interim Water & Related Land Management Plan and $55,000 for the dredging of the Keating Channel. Conservation & Recreation Land Mana ement: An increase of $23,480 to cover increased costs. (This includes the Water- ront Support . Waterfront Plan: An increase to $1,565.125, which includes $496,000 for the supplementary project. (Net increase is ~165,125). 1980 PRELl MINARY BUDGET, SUMMARY 4. I --- 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ( 1978 ACTUALS I , I ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENJITURES I REVENUES EXPENDITURES GRANT LEVY [_.. __ - _____ , I ~I.~~~l~ :~~~'R'\T I,(~ ; I, ' I Administration 1,499,160 70,000 1,429,160 714,580 714,580 I - 1.347,000 I 70,000 II 1,244.548 I 91,379! I 'I I I ,I,! 1" ..., "'" ~ .. , ,'" , . :' ! I I ~: :,l.,,-! In~~.0~.Ij'o; 1J..~.\:l:I.I.. I i I (;,'l\e1'al0pc'rations 1111,200 16,500 I 99,700 - 89,700 16,000 112,000 I 10,500 146,875 I 7U,9114 i Cllnscn'ation I\rea Operations I,C,96.1100 982,335 713,665 I - 713,(,65 - 1,370,800 710,000 1,268,713 753,50,1 I \' CllRUnunity Rel;ltions Ii Education 1,100,400 989,235 111,165 25,000 79,165 7,000 859,000 757,700 764,036 627,069 Rlack Cn'eJ.. Pioneer Village 1,032,900 888,900 144,000 72,000 72,000 - 88!l,OOO i511,OOO 877,8lO i 77:;,2% I Ii 3,945,500 2,876,970 1,068,530 97 ,~OO 954,530 I 17,000 3,230,1100 12,2:';4, :!l10 3,057,434 12,224,913 I~:\TER Ii RELATEIJ LA:"oJlJ ~1:\NAl;E~IENT ,I I I I I lOp. Ii Mntc. of I~.C. Structures' 209,940 - 209,940 115,467 94,473 - 184,000 I - Ibll,739 i - . Community Relations - Support 278,120 - 278,120 152,966 125,154 - 239,000 - I 238,108 I - Conllnanit)' Relations - Development 459,000 - 459,000 41,800 34,200 383,000 I 471,194 - II 206,6'HI i - Taxes Ii Insurance 279,500 - 279,500 153,725 125,775 - '198,000 - 199,341 I - 1,226,560 - 1,226,560 463,958 379,602 383,000 1,092,194 - 864,837 - INTERnl PROJECT I~ater Control Projects 117,350 - 117,350 64,543 52,8Q7 - 92,500 I - I 84,472 - Regulations 199,640 - 199,640 109,802 89,838 - 182,500 I - 156,599 I - I Conservation Services 258,950 62,500 196,450 108,047 88,403 - 208,000 15,000 77,259 13,583 All Benefiting 1,471,560 - 1,471,560 809,358 662,202 - 1,339,273 - 2,772,757 - Benefiting ~funicipa1iti~s 1,645,300 40,300 1,605,000 882,750 722,250 - 1,776,690 27,000 1,007,021 22,469 3,692,800 102,800 3,590,000 1,974,500 1,615,500 - 3,598,963 42,000 4,098,108 36,052 KI':;,TItI(,; CHANNEL r ! ] .-- - K.,.ltinq Cham..'l 100,000 - 100,000 55,000 45,000 - - - - - . CONS. & RECREATION LAND MANAGEMENT I Conservation Areas - Support 170,750 - 170,750 85,375 85,375 - I 143,500 - 126,235 ! - ; I Conservation Areas - Development 126,500 - ! 126,500 63,250 63,250 - 126,500 - I 217,264 I - Conservation Areas - Development 23,000 23,000 - - - - 66,000 I 66,000 I - I - i I I Cons. & Niagara Escarpment Land - - - - - - 48,f>01l - I 449,712 I - I I I I Informntion & Interpretive 22,680 - 22,680 11,340 11,340 - 21,000 - 21,2% - I I I R..mt & Utilities 43,280 - 43,280 21,640 21,640 - 39 , 000 - ,6, '>03 - Tax0s & Insurance 78,000 - 78,000 39,000 39,000 , - 70,000 - i I (.H.: 78 - I , , 464,210 23,000 441,210 220,605 220,605 - 514,800 66,000 919.188 I - I I WATERFRONT I I : I lol,tterfront - Support 71,750 - 71,750 35,875 35,875 - 66,000 - 58,889 I - Ii Wdtcrfront - Capital 3,130,250 - 3,130,250 1,565,125 1,565,125 2,800,000 ! 111'4&6'993 i - - I - 1I1S'l'OIUC SITES --- I Historic Sites Development 46,000 - 46,000 - - 46,000 60,000 - 51,557 - ! I i , I I Total Current 7,753,680 3,032,470 4,721,210 1,772,918 2,502,292 446,000 6,763,794 2,385,200 6,514,783 2,329,875 I Total Capital 6,422,550 40,300 6,382,250 3,353,725 3,028,525 - 5,945,963 27,000 15,266,771 22,469 14,176,230 3,072,770 11,103,460 5,126,643 5,530,817 446,000 12,709,757 2,412,200 21,781,554 2,352,344 THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 5. COMPUTATION OF 1980 LEVIES GENERAL PROJECTS - INTERIM WATER lie RELATED LAND MANAGEMENT PROJECT - lolATERFRONT 1 980 LEV Y (1) 1979 INTERIM WATER & RELATED PROJECT Waterfront Before Tax 2 Total Incl. Total Incl. Capital Capital , Special Plan Tax Adjust. Adjustment( ) Tax Adjust. Tax Adjust Current All Ben. Ben. '~Iun. Total Keating 1977-1981 $ $ $ $ $ $ $ $ $ $ Adjala 212 - 212 190 19 66 - 85 - 44 Durham 35,245 46,365 81,610 74,165 3,080 10,879 11,250 25,209 - 18,367 Metro Toronto 1,850,300 - 1,850,300 1,660,497 170,411 601,886 472,500 1,244,797 45,000 1,679,542 (3) Mono 206 - 206 185 19 66 - 85 - 40 Peel 143,311 76,060 219,371 198,392 12,509 44,183 45,000 101,692 - 24,795 York 124,903 28,590 153,493 138,321 11 ,062 39,070 193,500 243,632 - 27,745 2,154,177 151,015 2,305,192 2,071,750 197,100 696,150 722,250 1,615,500 45,000 1 750 533(4) '. ' (1) The 1980 Levy is based on the latest equalized assessment figures available to the Authority (1977 assessment data for 1978 taxation purposes). These figures are subject to revision when current figures are available from the Province. (2) Tax adjustment is based on 1979 plus 9\ (per W.E.J.). (3) Includes $496,000 for supplementary project. (4) Includes $185,408 for deficit in levies from previous years. BASIS OF APPORTIONMENT - MUNICIPAL LEVY 6. BASED ON THE LATEST EQUALIZED ASSESSMENT FIGURES AVAILABLE TO THE AUTHORITY (19// ASSt:SSMt:Nl UATA l' Ul{ 1!1 /is TAXAT!UN PURPOSt:S) Total ~ of Equalized Population Equalized Municipality Assessment Total In Municipality Assessment In Authority In Authority Population Authority l,OOO's of $'s 1,000's of $'s Ad,jala Township 41,103 8 3,288 3,494 279 Durham. Re~ional Municipality of 699,621 * 546,880 64,603 51,197 ~etropolitan Toronto 28,710,379 100 28,710,379 2,147,852 2,147,852 Mono Township 63,984 5 3,199 3,856 192 Peel. Regional Municipality of 5,298,268 * 2,223,697 401~ 300 171,853 York. Re~ional Municipality of 2,293,334 * 1,938,075 154,674 124,925 37,106,689 33,425,518 2,775,779 2,496,298 ANALYSIS OF REGIONAL MUNICIPALITIES Durham, Regional Municipality of 218,262 Ajax Town 86 187,705 22,318 19,193 Pickerin~ Town 352,261 95 334,647 31,541 29,963 Ux~ridge Town 129,098 19 24,528 10,744 2,041 699,621 546,880 64,603 51,197 Peel, Regional MuniCipality of Brampton. City of 1,373,229 63 865,134 114,290 72,002 Mississauga, City of 3,637.307 33 1,200,311 263,652 87,005 Caledon Town 287,732 55 158,252 23,358 12,846 5,298,268 2,223,697 401,300 171,853 York, Regional Municipality of 151,625 Aurora Town 4 6,065 14,703 588 Markham Town 880,432 100 880,432 59,204 59.204 Richmond Hill Town 412,203 99 408,080 35,150 34",798 Vaughan Town 481,122 100 481,122 18,308 18,308 Whi~church-Stouffville Town 160,087 43 68,837 13,044 5,608 King Township 207,865 45 93,539 14,265 6,419 2,293,334 1,938,075 154,674 124,925 * NOT AVAILABLE IN TOTAL PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Administration PAGE 7. PURPOSE: To provide the administrative and financial services of the Authority. , 1980 OBJECTIVES: The continuation of general administration and financial support services for all Authority programs. Salaries of senior administrative staff and associated secretarial, Administrators, the Finance Division and Property and Administrati~n Division, are charged to this program together with employee benefits for all employees. FUNDING: This is a shared program, 50\ of the (unds being available fr~m the Province of Ontario and the balance being funded from the General Levy on all participating municipalitles. FINANCIAL COt-L\IENTS: The budget estimates include:- - an increase in salaries & wages of 8\ for an economic adjustment and provision for merit increases, where applicable - provision of $50,000 for Phase II of the Management Study OBJECTIVE CLASSIFICATIONS: Materials Salaries Employee Supplies & Real Services Financial & Wages Benefits Utilities Equipment Property & Rents Taxes Expenses Total - - 621,610 460,500 172,250 - - 244.700 100 - 1.499.160 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM A.lmi II i st ,'at i 011 PAGE R. 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURl:'S REVENUES EXPENDITURES GRANT LEVY ~ I Salaries 621,610 - 621,610 310,805 310,805 I - 5bO,150 - 530,900 - Employee Benefits 460,500 '" 460,500 230,250 230,250, - 44tJ,500 - 399,301 - Travel Expenses 98,000 - 98,000 49,000 49,000 I - 97,500 - 87,093 - [llllipmcnt l'urdwse & Renta 36,400 - 36,400 18,200 18,200 - 36,000 - 25,358 - ~lateri:lls & Supplies 89,600 - 89,600 44,800 44,800 - 81,500 - 72,843 - Rent & Utility Services 82,650 - 82,650 41,325 41,325 - 77,250 - 78,344 - General Expenses 60,400 70,000 (9,600) (4,800) (4,800) - 54,100 70,000 50,709 91,379 ~Ianagement Study 50,000 - 50,000 25,000 25,000 - - - - - I I , I . : TOTAL )( 1.499.160 I 70,000 11,429.160 )( .714.580 I 714,580 I - )( 1,347,000 I 70.000 )( 1.244.548 I 91,379) PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operat ions and "laintenance - General_ Operations PAGE 9. PURPOSE: To provide administative support services, for which a Provincial Grant is not available. 1980 OBJECTIVES: - to fund the maintenance of revenue producing properties and other general maintenance - to fund the public liability insurance on vehicles and equipment - to fund renovations to the Head Office Administration Building - to fund the office cleaning and maintenance - to fund the Authority's share of vehicles and equipment FUNDING: Program revenues, the General Levy on all participating municipalities and Authority funds. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ - 27,500 5,000 - 83,700 - - 116,200 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operations to Maintenance - t.;eneral Operations PAGE 10, 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVEtl:UES EXPENDITURES GRANT LEVY , IRental Property ~Iainten- ance - Revenue Producing Prop~rtics to General ~Ia i ntenance 27,500 16.500 11,000 - 11 ,000 - 32,500 16,500 32,388 21,194 Vehicle (, Equip. Suspense 5,000 - 5,000 - 5,000 - 5,000 - 19,358 - r n su ranee 12,85Q - 12,850 - 12.850 - 12,000 - 8,839 - lIead Office Renovations 10,000 - 10,000 - - 10,000 10,000 - 26,<>02 - F Innd Cont ['01 ''lorkshop 2.000 - 2.000 - 2 ,000 - 1,500 - 1,088 - Office Cleaning 20,300 - 20,300 - 20,300 - 19,000 - 15,317 - Office Maintenance 38,550 - 38,550 - 38.550 - 32,000 - 43.283 - Bank Interest - Non-Capital I Programs - - - - - - - - - 49,790 ; I I ( )( 116,200 I I )( . I I 10,000 )( I 16.500 )( I ) TOTAL 16.500 99.700 - 89.700 112,000 146.875 70,984 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operations and Maintenance - Conservation Area Operations PAGE 11. PURPOSE: The conservation and management of lands under the jurisdiction of the Authority and the provision of outdoor recreation opportunities. 1980 OBJECTIVES: - the management and operation of 18,000 acres of Authority lands including 13 conservation areas, which will provide 1.5 million user days of recreation - provide for the same level of maintenance of services as in previous years, reflecting continued budget limitations. Selective use and management of Authority lands is required to maximize use and minimize costs. - to provide self-supporting visitor services FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial Grant is available for this program. FINANCIAL C~~ENTS: In 1980. projected program revenues have been estimated to be considerably higher than 1979, reflecting increases in fee program revenues. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & l'lages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ , $ 1.040.900 385.320 127.550 - 18,850 123.380 - 1.696.000 PRELIMINARY 1980 CURRENT BUDGET 'ESTIMATES PROGRAM Operations & Maintenance - Conservation Areas PAGE 1? 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES EXPENDITURES GRANT LEVY Albion IIills 275,850 192,035 83,815 - 83,815 - 233,000 140,400 226,187 148,631 Boyd 151,400 108,500 42,900 - 42,900 - 137,000 82,600 120,833 89,969 Bruce's Mill 224,600 166,800 57,800 - 57,800 - 161,000 114,100 133,983 104,380 Claremont 56,650 18,800 37,850 - 37,850 - 50,000 11,000 43,991 15,271 Claireville 248,050 187,800 60,250 - 60,250 - 179,000 ' 127,200 . 198,807 132,307 Cold Creek 130,950 69,400 61,550 - 61,550 - 92,000 42,300 86,61~ 53,343 Glen lIaffy 96,850 33,200 63,650 - 63,650 - 84,500 26,700 68,690 25,151 Greenwood 115,900 32,900 83,000 - 83,000 - 103,000 22,400 82,409 26,746 1I~'rt Lake 150,250 82,400 67,850 - 67,850 - 129,500 67,700 96,458 68,410 lIumber Trails 10,200 1,800 8,400 - 8,400 - 9,000 1,500 6,957 1,760 . . ~Ii llle - - - - - - 7,800 7,800 33,520 17,300 ; Pal~rave 14,150 .7,000 7,150 - 7,150 - 9,000 9,000 19,284 758 Service Area 21,400 - 21,400 - 21,400 - 17,000 - 13,533 - Woodbridge 9,100 - 9,100 - 9,100 - 8,000 - 6,900 - Petticoat Creek 190,650 81,700 108,950 - .108,950 - 151,000 57,300 121,931 61,958 Visitors Services - - - . - - - - 8,614 I 7,580 I I ( )( 1,696,000 I I )( . I 713,665 I )( 1,370,800 I )( 1,268,713 I 753,564 ,) TarAL 982,335 713,665 - - 710,000 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operations & Maintenance - Community Relations - Information & Education Operations PAGE }3. PURPOSE: To provide an outdoor and conservation education program for school students and other community groups at five Conservation Field Centres and a variety of outdoor and conservation education opportunities for the general public an~ school groups at the Kortright Centre for Conservation and at the Black Creek Pioneer Village. 1980 OBJECTIVES: - a continuation of the program at the same level of service as in 1979 for existing facilities - to provide an outdoor and conservation education program for the following estimated number of students and adults:- Black Creek Pioneer Village 64 , 000 Conservation Field Centres 18,500 Albion Hills Conservation Farm 9,000 Maple Syrup Days 31,000 Special Days, Field Trips, Claireville Dam Tours etc... 12,000 Kortright Centre for Conservation 50,000 FUNDING: Program revenues and the General Levy on all participating municipalities. A surplus or deficit on the operations of the Boyd Conservation field Centre and Lake St. George Conservation Field Centre will, be agreement, be charged or credited to the participating boards of education. A grant of $25,000 from the Provincial Ministry of Culture and Recreation is estimated for the operation of the Kortright Centre for Conservation and $7,000 from The Metropolitan Toronto and Region Conservation Foundation Kortright Centre Growth Endowment Fund. FINANCIAL CO~IloIENTS: The estimates provide for an increase in revenue to cover the projected increase in expenditures. The net eost to the municipalities is estimates at $79,165. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Se'rvices Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 594,800 175,600 60,000 - 270,000 - - 1,100,400 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operatjon~ and Maintenan.:e - Conununity Relations - Information & Education Operations PAGE 14. 1980 BUDGET SOURCES OF FINANCING ~- 1979 BUDGET 1978 ACTUALS 1 ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPENDITURES REVENUES - EXPENDITURES GRANT LEVY Albion Hills C.F.C. 158,000 158,000 - - - - 147,500 147,500 126,035 131,793 Boyd C.F.C. 180,000 180,000 - - - - 167,000 167,000 165,597 165,597 Claremont C.F,C. 158,000 158,000 - - - - 151,500 151,500 146,151 146,099 , Cold Creek C.F.C. 37,000 37,000 - - - - 36,500 36,500 38,(,71 37,134 I.ake St. George C.F.C. -I 180,000 180,000 - - - - 68,500 68,500 - - -II 68,000 68,000 - - - - - - - - General Interpretive Pro. 11 ,000 11 ,000 - - - - 10,500 10,500 21,372 10,929 B.C.P.V. Pioneer Life 38,550 26,000 12,550 - 12,550 - 37,500 24,500 37,835 I 23,870 B.C.P.V. Tours 77 ,ISO 42,000 35,150 - 35,150 - 73,000 39,700 70,770 31,814 Kortright 192.700 129,235 63,465 25,000 31,465 7,000 167,000 112,000 93,711 25,826 I I Fann Conversion - - - - - - - - 63,894 54,007 l I I TOTAL )( 1,100,400 I 989,235 I 111,165 )( 25,000 I 79,165 I 7,000 )( 859,000 I 757,700 )( 764,036 I 627,069 ) PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Operations and ~Iaintenance - Black Creek Pioneer Village.. PAGE 15. PURPOSE: To provide a 1 iving portrayal of a crossroads vi llage in pre-confederation Ontario. 1980 OBJECTIVES: - to continue the' effective operation of this heritage conservation project within financial constraints - to accommodate in excess of 300,000 visitors - to maintain the Village's heritage structures within financial constraints FU:-mING: ~lajoT funding comes from gate receipts and sales outlets. It is anticipated that the Authority will match grants from the Min i stry of CuI ture & RecTeat ion with levy funds. Additional funds arc expected each year from the Foundation as the Black Creek Growth Endowment Fund continues to expand, FINANCIAL CO~~lENTS: Additional revenue results from increase in admission fees and the optimizing of revenue from all Village trades and facil i ties. Due to budget constraints. it will not be possible to open the Dominion Carriage Works. Taylor Cooperage and Sawyer's House as planned. OBJECTiVE ClASSIFICATIONS: ~Iaterials Salaries Supplies & Real Services Financial & I~ages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 667,500 318.900 10.000 - 32.500 4.000 - 1.032.900 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Ope rat ions & ~Ia intenance - Black Creek Pioneer Vi llage PAGE 16. r 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ~978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPEr~DITURES REVENUES EXPE.'JDITURES REVENLJES ~- EXPENDITURES GRANT L.EVY Administration 188,000 - 188,000 - 188,000 - 178,000 - 180,064 - Rui Iding Staff etc... 434,600 - 434,600 72 ,000 362,600 - 338,600 - 272,353 - Food Facilities 19,500 - 19,500 - 19,500 - - - - - (;a te lIouse 18,300 - 18,300 - 18,300 - 16,500 - I 12,080 - i Gi ft Shop 141,8{)0 - 141,800 - 141,800 - 122,600 - 1,7,988 - Livestock 59,000 - 59,000 - 59,000 - 55,500 - 54,094 - ~Iaintenance - Buildings 35,500 - 35,500 - 35,500 - 64,000 - 53 , 136 - ~Ia in tenance - Grounds 39, 100 - 39, 100 - 39,100 - 49,300 - 56,492 I - Promotion & Publications 17,300 - 17,300 - 17,300 - 13,000 - 9,070 - Registrar 36,800 - 36,800 . - 36,800 - 21,500 - 32,003 - I Revenue Activities 23,700 - 23,700 - 23,700 - 11,600 - 14,095 - I I Securi ty 19,300 - 19,300 - 19,300 - 18,400 - 16,435 - Admission Receipts - 490,000 (490,000) - (490,000) - - 405,000 - 434,322 Endowment Interest - 14,000 (14,000) - (14,000) - - 10,000 - (170) Food Serv i'ces 45,000 (45,000) (45,000) I - - - - 40,000 - I 38,595 Revenue Activities - 28,500 (28,500) - (28,500) - - 18,000 - 14,493 Rentals & Miscellaneous - 8,000 (8,000) - (8,000') - - 2,000 - 9,079 Sales Outlets - 303,400 (303,400) - (303,400) - - 275,000 - 276,977 ( TOTAL ) ( 1,032,900 I 888,900 I 144,000 )( 72 , 000 I 72,000 I - )( 889,000 I 750,000 )( 877,810 I 773,296 ) PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Water & Related Land Management - Operations & Maintenance of W.C. Structures (N5) PAGE 17. PURPOSE: To maintain Flood Control works established under the Authority's plan for Flood Control and Water Conservation as well as under the various Downstream Erosion Control programs. 1980 OBJECTIVES: - contin~ation of the Regular Maintenance of the Flood Control Works at a level comparable with 1979 - major maintenance to be carried out at Milne Dam, Black Creek Channel - non-destructive testing of gate hoist cables at C1airevi11e Dam FU:-mING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINJ\NCIAL CO~~lENTS: Funding has been allocated in order to cover a progressive maintenance program, including non-recurring major maintenance. OB.JECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total - $ $ $ $ $ $ $ $ 72,000 60,000 - - 77 , 940 - - 209,940 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM ~ater & Related Land Contl"ol Structllrc-; I\! 5 PAGE 1R. 1980 BUDGET SOURCES OF rlNANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEf\:UES EXPEND!TuRES REVENUES EXPENDITURES GRANT LEVY rlood \'iam ing System 24,000 - 24 , 000 13,200 10,ROO - 18,000 - 12,488 - Claireville Dam 31,905 - 31,905 17,548 14,357 - 23,000 - 26,871 - ~Ii lnc [)am 5,000 - 5,000 2,750 2,250 - 4,000 - 5,054 - (;. Ross Lord Dam 24,730 - 24,730 13,601 11,129 - 23,000 - 19,868 - Sma 11 Dams (;CllC 1'a I 4,000 - 4,000 2,200 1,800 - ~,OOO - J ,RI8 - ~Iood Control Channels 65,305 - 65,305 35,918 29,387 - 75,00D - 75,225 - Erosion Control 5,000 - 5,000 2,750 2,250 - 4,000 - 1,462 - "fajor ~laintenance 50,000 - 50,000 27,500 22,500 - 34,000 - 17,953 - I I I I ; I ! , f j ( TOTAL )( 209,940 I - I 209,940 )( 115,467 I 94,473 I - )( 184,000 I - )( 160,739 I - ~ PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM l~ater {; Related Land ~lanagement - Community Relations (Support) (WlO) PAGE 19. PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information, community and staff relat ions :md Olltdoor and COl1servat ion program. 1980 OIlJECTIVES: _ to provide Information, pllblicatlons, tours and official openings of projects, photographic coverage, mOVie prints of eXlsting films and exhibits relatin~ to water and land management aspects of the Authority program _ provision has been made for the funding of a .N.E. Exhibit HJ~[)IN(;: This is a shared program, 55~. of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. OBJECTIVE CLASSIFICATIONS: ~Ia t eria 1 s Salaries Supplies & Real Services Financial & Wages Ut il ities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 231,595 46,525 - - - - - 278,120 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Watcr f, Rclated Land ~lanal:l'mcnt Community Rclations (Sllpport) (WIO) P,\GE 20. 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVEf\:UES EXPENDITURES REVENUES EXPENDITURES GRANT LEVY CO:-;S[:RVAT 10:\ I Nr:OR~IATION Staff Salaries 64 ,200 - 64,200 35,310 28,890 - 57,735 - 50,853 - Staff Travcl f, Expcnses 2,000 - 2,000 1,100 900 - 2,000 - 2,132 - Publ ications f, Printing 13,325 - 13,325 7,329 5,996 - 12,500 - 20,281 - Tours f. Special Days 3,200 - 3,200 1,760 1,440 - 4,U15 - 1,167 - Photographic SupplIes 3,000 - 3,000 1,650 1,350 - 3,250 - 3,685 - I ~Iot ion Picture Program 3,000 - 3,000 1,650 1,350 - 4,000 - - - Exhibits 20,000 - 20,000 11 ,000 9,000 - 1,000 - 8,348 - Promotional Contingency 1,000 - 1,000 550 450 - 1,000 - - - I ; CO:-\Si:lWATlON EDUCATION Staff Salal'lc~ 58,770 - 58,770 32,323 26,447 - 53,500 - 49 , 134 - Staff Travel f, Expcnses 1,000 - 1,000 550 450 - 1,000 - 1,066 - Education Supervisors 108,625 - 108,625 59,744 48,881 - 99,000 - 98,334 - Part Timc Staff - - - - - - - - 3,108 - I I ( )( I I )( . I I )( 239,000 I )( I ) TOTAL 278,120 - 278,120 1~2,966 125,154 - - 238,108 - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM _I~ater ~ _R:,~te~,~~~~_ ~Ianagement - Comlll~ni:L.~e~a_tions (Ucve,I,opmentJ. ~IO)___. _______ -- .-.----- PAGE 21. PURPOSE: To develop the facilities required for the Authority's Outdoor and Consl'!"vation EducatIon Prop'ams. 1980 OIi.JECTIVES: - the development of trails, outdoor exhibits and demonstrations at the Kortright Centre for Conservation - the development of additional indoor exhibits, fUl"I1ishings and c'llllpment for the Kortright Ccntr~ for Conservat.lon - to complete the construction and development of the Lake St. George Conservati.on Field Centre (Stage 11) FUNDING: For th.: developmcnt of thc Kortright Ccntrc (Area nevelopmc.:nt), 55~b of tho funding is from tht: PrOVInce of Ontario, the Balance of 45% from the General Levy on all participating muniC.lpalities. For the Exhibit Program, $200,000 is dependent on funds from The ~Ietropolitan Toronto and Region Conservation Foundation and from IHntario, with the balance of $83,000 proposed to be spent from the 1979 approved funding from the Foundation and Wintario. For the construction and development of Lake St. George (Stage II), funding will be obtained from the eight partici- pating school boards, by agreement. OIUECTlVE CLASS I FICATIONS: ~Iaterials Salaries Supplies & Real Serviccs Fi nancial & I~agcs Ut il i ties Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 180,000 209,000 - - 70,000 - - 459,000 P.RELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Ivater Ii 1{C'latct!_l.andl~.!!:!.g,'m"nt - Cummunity' Relations (U~'vdo)lmcntLmQ,L ------------ PAGE ?? -- -- SOURceS OF FINANCING J~979 ""nCtT ~ 1~T97il ACTUALS~ 1--- 1980 BUDGET ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL- '~MUNICIPAL OTHER EXPENDITURES~VENUES EXPENDIT~;;~EN'JES -.--- - -- . -, ~- EXPENDITURES GRANT LEVY _ _ ~_ --- ---1 ; I . I Bllyd hh..:at iOIl C'"I1j1":X - - - - I _ i-I - i - ! ~14 ,786 i-I A I b i on II i II s C. F . C . - - - _ _ -, 7,000! - I - I - I Lake St. Ceorgc - Stage II 100,000 100,000 I I I - _ _ 100,000 171,722 I - 778 I - I Kortright a) Area Uevclopment 76,000 - 76,000 I . Ii, I . 41,.800 34,200 - 7b,000 -) . i b) Exhibits, fllrnishin~: I ) 171,085! - , and Equipment 283,000 - 283,000 - - 283,000 216,472 - ) I i I , I , I I I , I ! : ! I ! I , I , ( TOTAL )( 459,000 I - I 459,000 )( 41,800 I 34.200 I 383,000 )( 471,194 I - )( 266,649 I - ) - PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM I~ater & Related Land ~Ianagcment - Taxes and hlSUl'ancc (1\'11 ) PAGE _~ ' ---" --- ._-- PURPOSE: To provide for co~ts a~sociated with taxes on non-revenue produdng areas and liability insur;mce on Authority lands undcr I~ater and Related Land Managcment Programs. FUNDINt;: Thi~ is ,a shar\:' program, 55q. of the funds heing ;l\"ailahl~ from the Province of Ontario and the bal;lIlce being funded from thc General Levy on all participating muni..:'l'allta,s. FI NANC 1 M. CO~I~'ENTS: Using a basc rate of $241,000 for 1979, an inflation figure of 7~. has becn addcd and an additional propertics figure of 5%, bringing the estimated spending for taxes in this account for 1980 to an amount of $270,000. No allowance has been made fOT market value aSSessment increases in 1980. OB.JECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financi a1 & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ - - - - 9,500 270,000 - 279,500 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM \\atel' I. Rc1atC'd La 11 ,I :.lanagefl1ellt - T:lXes and lnsur:lnc:c (\~ll) P;'G E 24. 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET. 1978 ,-\CTU..'..LS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES I EXPENDITURES REVENUES EXPENDITURES GRANT LEVY I axes, 11011'- revenue 270,000 - 270,000 148,500 121,500 - 189,000 - 190,073 - (nSll ranc:e 9,500 - 9,500 5,225 4,275 - 9,000 - 9,268 - I 1 I I \ I I I I . ! I I ; , I I I , i I I [ TOTAL )( 279,500 I - I 279,500 )( 153,725 I 125,775 I - )( 198,000 I - )( 199,341 I - ) PRELIMINARY 1980 CURRENT BUDGET ESTIMATES ?ROGRAril \\'att'r {I Hl'l:ltl.d I..llh! ~1:111.1:',",1."-'I,t - Int~ 1'1-'1 Pl~~.t_ '1I1Il,':I~:l. ~_~II~l~!lt_ I',~~~_-- P:.'::;E _25.__ ( 1980 BUDGET (- SOURCES-CF-FINAtJCING r-~7-9 BUDGi::T ---.. ( 1978 ;"CTL'.:'.LS ACTIVITY NET PROV::-.JCIAL MUNIC:P,:,L I i 'XPENOITVe" I I EXPEr-.:DITURCS REVENUES or H ER EXPENDITURES REVEf\:UES RE\'E;,.)::S I EXPENDITURES GRANT LEVY ; ! i I I W.e. Projects 117,350 - 117,350 64 ,543 I 52,807 - 92,500 - I R,l,.J72 I Ik;:L:lations J99,MO - 199,640 109,802 89,838 - 182,500 - I 150,50~ i 1 Conservation Services 258,950 62,500 196,450 108,047 88,403 208,000 15,000 77,259 I 1';,583 I - I I I I i 11,471,5bO I ,\i 1 Bel~efiting - 1,471,560 809,358 662,202 - ! 1,339,273 - 2,772,757 - I Benef i t i ng ~hlll ic I pa 11 ties \1,645.300 40,300 1,605,000 882,750 722,250 - 1,776,690 27,000 1,007,021 I 22,409 I I ! I I . : I I I I I 1 I I I I I i I I I . l I j I TOT AL )0,692,800 I 102,800 I 3,590,000 )( 1:974,500 11,615,500 I - )( 3,598,963 I 42,000 )( 4,098,1081 36,052 ) PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM I~aler " Related Land_ :.lan~gL'~ent._.:..-.!-"tl!.rim ~~'~~~__Currcn~_::..~~2), llHJ ~_~~~~ ~ ll~~_ __ __ ___ _ PAGE. ~_ PURPOSE: To pruvide the required funding for carrying out the objcctives of the InteLIU l~atcl' and Rdat.:J Land ~lan;,g':llIcnt Project. 1980 OB.JF.CTIVES: - to provide funding for the continued update of the Authority's radio systcm and flood warning s)'stcn. _ the administrat ion and cnfon:ement of water managciDent rq~1I1;lt ion and development review fun,.t l..ln Indlldll1g enforcement. office!":';' salaries and support costs _ to carry out resourcc management practices on Authority lands and to provide Conservation Assistance Programs for pri vate lando\oo11crs FUNDING: This is a shared program, 55\ of.the funds being available from the Province of Ontario and the balance being funded from the (;eneral Levy on all participating municipalitics. OIJ.JECTIVE CLASSIFICATIONS: ~Iaterials Salaries Suppplies & Real Services Financial & Wagcs Utilities Equipment Property & Rents Taxes Expenscs Total $ $ $ $ $ $ $ $ 308,740 156,500 23,000 - 87,700 - - 575,940 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROG~AM 1~;ltl'r I, Rl:latl'd I..,;,,! ~1.':I:I>':l'I:!l~l1t - lll'~'l'illl I'rO)l'ct l:lIl'J'dlt \\ater ~Int:.\ L.~\"1i. .l.!!.=.J..___ - -_.-_.~-- ?:'G~ ,_.-1lt..--- ~ 1980 BUQGET (-1(P-9--~i:6GE7----"(-T9::-s ':'C --:1 ~ "\ I-- .1.-__ '"" .. ----:. - I &- _L.._~ ACTIVITY 'i E.XPENDi"URES! REVE:-;~ES ii EXPEND;TLlR~S! REVE,~J:JES . I ! I EXPENDiTURES . REVEt>:UES EXPEN~TiuRES 'I I II . , Sr,IFf S:.larics I 91,350 - I 91,350 50,243 I {lS /SOO I _ 45 -,1 - I I , i ' . I !~ -,- I Staff l'ra\'el 3,000 - I 3,000 1,650 1,350 ! .- 3,7lHl I - I. -,hl. Flood Contn,l Stnactu\'cs - - I - - - I - I I 9,8!'-9 - r I - - I I I Sa fety Stat ions - - - - - - - l!l\j - I I I I . II Mi Inc Study - - - - I - I - - - 1,500 I - I , I , I i ! i FI(l~d I\arning System , , I 1,350 I I I I i Ra.l io 3,000 - 3,000 1,050 I - 15,000 - 17,50~ I - j . I I Telcmarks 20,000 - 20,000 11 , 000 9,000 I - 8,000 - 7,3b5 - Flood Control Centre - - - - - - - - 968 I - Ii I . I I ! . i I II I ! I; I ! , I I I I I I i I I I I i I I I I I I I I . I I I . i I ( )( I I 117,350 )( . 64,543 I 52,807 I )[ 92,500 I )( 84 ,472 I ) T<YTAL 117,350 - - - - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM \\;It.'r i. Ik:at~'d 1.."..1 ~lall;lI:cml.'lIt - Interim l'r011.'ct C\ll"l:,'!..!!..-:..-.l\al~'r ~1~!!.!l.:~'::!~L-!h~!~' ~J PAGE __ 2~ ----- v. )( 1980 BUDGET '\( SOURCES-O~NCING~Ir-19i9- BlJDGET---"I( 1978 ;'.C7U.:"LS "' ACTIV ITV II ExPE.IlITUnES REvENUES EXPEN~\iuRES Ii PRg~:t''::+Al ""NL~'C9l i OT" ER : ~ EX',"OITURES I REVE""ES Ii EXPEND'TURES i REV'.vES ! II I I I ! ; I ~ I ""Cf '.01."""' I' m."'''' - I ".."'0 I "5."-: ';';.3: - . 104.""". - ': "'.'''. I - : Staff Travel Ii Exp('nses 4,000 - 4,000 2,200 I 1,800 i-II 4,000 I - Ii 3,715 I - I ,,,fo,',""'"' Of""" s.1. 54,29. - "'.2'0 29.'"'0 24,43. I-i. 48,.00 - ~ "-'.790 I - I Enfol'cement Officers Veh. 12,000 - 12,000 6,600 5,400 - I 11,500 - I 13,365 I - I.cgal Fees 5,700 - 5,700 3,135 2,5b5! - I 8,300 - I 4,912 - Tcchn i cal Plans & ~laps 5,000 5,000 2,750 .l,250 i I; , - - 5,000 - I b,i58 - I ! I I I I, I . i I I I " . I ; I ,I I I i I I I I I l I ( )( I I 199,640 )( . I 89,838 I )[ I )( 156,599 ! ) TOTAL 199,640 - 109,802 - 182,500 - - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROG~AM I\at~'r I, Iklah',( 1.11.\1 ~Ia:l;il:~'meat - IntcJ'im I~ru,k.:~- ':,~_~t~~1I -;, J'\.IC\.... I, I~i\~.rban" II.~:~~,~ ~\:l)_l\\:;l I-':'C:~ ___ll.__ -,-- . r 1980 8UDGET ,r-SOURC"-OT F1NA.icING ' ( - 1~1---=-8- ;- ~-".' . "' I. 1979 EUDGET ~I ~~J~~L~ . . , Ii EXPENDITURES I RE:Va.;~ES I ACTIVITY EXPENDITURES REVENUES I NET i~;;-CIAL- ! MUtl:iCJ;AC-i OTH-R .!EXPE~rnTuRESI REVE~uES . . I EXPENDITURES GRANT I LEVY Co I d I II I I I Staff SalaJ"ies 34,850 - 34,850 19,1b7 1~.bX:l , - 31 , .lI1:! I - ! I I 'I 1.\ ,850 I - Staff Travel 2,600 1.430 1,170 I I! .2,000 I I . .2,600 - - :1 - I! 1,078 I - r ' Plant Propa):at ion '\0,000 45,000 (5,000) (2,750) I (2,250) - 5,000 I - - - .1 I - i - Forc.stry Developmcnt 22,000 - 22,000 1 12,100 I 9,900 I - I' - - I I I I I ~ I I Private l.ands I i II I Forestry 43,500 15,000 28,500 15,675 12,825 - I, 33,000 12,000 26,514 I 11,0(;.1 I ,I I I Stream Improvcment 27,000 2,000 25,000 13,750 11,250 - I' 28,000 I 2,500 I 30,189 I 2,304 Land Usc Planning 5,000 500 4,500 2,475 l,025 ! - 13,600 I 500 I 4,628 215 I I I . Authority Lands I ; I I I Forest ry 66,000 ,- 66,000 30,300 29,700 i - 05,000 - - I - I i i Stream Improvcment 10,000 - 10,000 5,500 4,5011 I - r 20,000 I - - - I I.and Managemcnt 8,000 - 8,000 4,400 3,600 - 10,000 - I - - I i I I I . , I ! I I I I I Il I i I ! ( )( 258,950 L ~ )( . I 88,403 I J[ I 15,000 )( I TOTAL 196,450 .108,047 - 208,000 77,259 13,~83 PRELIMINARY 1980 CAPITAL BUDGET ESTIMATES PROGRAM __~~ater & Re1ated_..!-and Ma!,ag,=en~, ~_ In_t~E.~I:I P:'?l.!':.~ Capi ~51.! ,- --..- ._--- .. .- -- --------. PAGE 30, -,- ,- - PURPOSE: To provide the funding rel!uired for carrying out thl' obj~'ct iv(,s of the Intcrim I\'ater and Related land ~Ianagl'ment Project which apply to all municipalities benefitIng :IS well :\:; ,:inglc benefiting lIIunh:i~lalitl~S. 1980 OS.JECr I \'ES: _ to continue the rcvic:w and dcvdopment l)f the ,\ullh';ity'..; !'lolll; Control Plan _ to .:ontinue vallcylaad ;I.:qulsltion a" well a" I 1Il!'lll.t ant hcad\~ater lands _ to complete construction of the Stouffville Channel _ to commence construct ion of the Oak Ridges and l~ilket Creek Cham:el Tr.ljlrovements _ to continue the UOlmstream Erosion Control Pro}:l'am In the l{cginlls of ~letropol itan Toronto, Peel, York anJ Durh.llll FUNDING: This is a shared program, 55% of the funds beinl\ available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. . The Interim Project as indicated encompasses both genera11)' benefiting and specifically benefitill~ mun.l.cipality projects. The projects are listed under the appropriate heading. The municipal share in both cases is 45% of the costs. OB.JECTIVE C1.ASSI FICATIONS: Materials Salaries Supplics & Rcal Sen: ices Financial & Wages Utilities Equipment Property & Rcnts Taxes Expcnses Total $ S $ $ $ $ $ $ 530,000 538,300 - 1,048,560 1,000,000 - - 3,110,860 PRELl rvlll\JAkY 1980 CAPITAL BUDGET ESTIMATES PROGRAM Il'a:cr t; lk1at~! 1.:1l1d \iallagl?,:;\.'l1t - Interll,l Pro.1c-:t.~ .ill Rellefitlll.L.._ .___ PAGE 31. -, 1980 BUDGET ( SOURCES OF FINANCING r 1979 BUDGET ~~].978 ACTUt\LY __ ___~~_TIVITY ___ EX~ENDITURES REVEf\;UES! EXPEN~T{URES I PRg~~~~L OTHER ! EXPENDITURES REVENUES I EXPENJI~LJREl--;~~~J:JES : Ian Review ! 236,000 - 1 230,000 II 129,800 106,200 I - II 397,liOO: - I 29,585: - I IlVll"llnr.k'nt.1! ~I"nltoring ! 17~,Ono - 1-2,000 I 0.J,hOO 77 "iOO : II iOO,lllll) 15S,t)-2 : lood Plain ACq~isition II 848,560 - 848,560 I 466,708 I 381,852 - i 682,273 I - 12,249,1>28 I - I l?:ld"aters AClllllSl t Ion 200,000 - 200,000 110,000! 90,000 - i 160,000 - I - - I , ' 'I I I i I i ..ll'plng I 10,000 - 10,000 5,500 I 4,500 - II - - I 135,813 - i Iydrologic ~Iodel II - -! - - I - - II - - i 188,992 I - ' 'omr.:unity Infol'mation 'I 5,000 - I 5,000 2,750 I 2,250 - II' - I - : h6S i - ,o,io" lnve",ory ,- I - - - - - - - I 12.599 I - I I " I' I I I " I . I I I I I I , , I I I LJ l TOTAL )(1,471,560 I - I 1,471,560 )( 809,358 I 662,202 I - )( 1,339,273 I - )( 2,772,757 I - ) PRELl MINARY 1980 CAPITAL BUDGET ESTIMATES PROGRAM \\,ll"l't; Iklat"d 1,1:,,1 ~!"lla\'('iIlL'llt - Intel'im I'l"l!e..-t - IklWfltllH' ,'J1.!IliI1J)Jlitl~'''__,_- Pt.GE )7._ ,( 1980 BUDGET .----SOURCES -OFFlNANCING ,( 1979 BUDGET 111978 A.CTU.-',LS -----j ACTIVITY If EXPH~DITURES REVENUES EXPEN~T{URES PRg~~~+AL I MU~t~:F;~L I OTHEr< lrEXPENDITURES REV Ei'-:'JE S 11~lTunES I REV::::,'JES I I !" ,I I I I : : ~ Ll'lJ,.IOIl (\.ntro1' ,'I I : ~Ictro ,825.000 25,000 800,000 440,000 I 360,000 I - 825,000 25,000 I 559,822 22'469! I'eel '105,500 5,500 100,000 55,000 45,000 I' - 101,000 1,nOO! - I - : York 83,300 8,300 75,000 41,250 33,750 - 75,500 500 - - I ,Illldl'lm, 26.500 1,500 25.000 13,750 I 11,250 i - i 25,500 500 -_ I' - I II1).:hland Creek (~I) I _ _ - - - - 240,000 - 408,/59 - I ~tollffville (Y) 305,000 - 305,000 167,750 137,250 - 395,000 - 10,234 I - ; Wilker Creek (~') 250,000 - 250,000 137,500 112,500 - 10,000 - - - I Oak Ridges (Y) 50,000 - 50,000 27,500 22,500 - 5,000 - 11,600 - ~lcth:lnc Gas Study _ _ - - - I' - - - 1,571 - , ' \iC-58 - [)Oll River - - I - - - - I 99,690 - 15,035 - I I 'I , I I I . 'I I I I I ! I ( TOTAL )(1,645,300 I 40,300 11,605,000 )( 88,2,750 I 722,250 I - )(1,776,690 I 27,000 )( 1,007,021 I 22,469 PRELIMINARY 1980 CAPITAL BUDGET ESTIMATES PROGRAM Water & Related Land Management - Interim Project - Supplementary Project - Keatin2 Channel PAGE 33, PURPOSE: To provide additional funding for the protection of the Lower Don River area from flooding. i980 OBJECTIVES: To commence the first of a seven-year dredging program of the Keating Channel on the Lowcr Don River. FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance beinlt funded from the ~Iunic~pality of ~letl"OJlo1itan Toronto, it being the desiAnated Bcnefiti.ng ~Iunicipality. OBJECTIVE CLASSIFICATIO~S: Materials Salaries Supplies & Real Services Financial & \~ages Utilities Equipment Property & Rcnts Taxes Expenscs Total $ $ $ $ $ $ $ $ - - - - 100,000 - - 100,000 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM hate r. t, I{e} atc~ _ Land ~Ianagcmcnt - Supplementary Pn~.iect -._--- -- ----- PAGE ~- l~ --~ 1980~BiJDGET ~- iOURi:ES'~ 0'-- FINANCING I r....- 1979 ~ B"ij(;Eg~i9 78- ACTUALSm -~ =1 ACTIVITY EXPENDITURES r REVEf\:UES I ~ET PROVINCIAL MUNICIPAL J OTHER :. EXDENDITURES I REVEt'UES EXPENDITUR"'S~f\""'NUt:S. , EXPENDITURES GRANT LEVY ; .' 'I' ~, ~ I ._ ._,- -- I -- 1 ----;-----:------- i , --- j- - n___ - - I II I I I' I ' K('at ing Channel Dredging I 100 000 - 100 000; 55 000 45 000 - .1 - I - I - ! - I II . . ,,' '! II I ! I : I I ' I 1 : Ii! ii ii, . II! I I ! j! I I I; I I i I I I ' I I I I I I I, I I I , I I , 'I ! I I I I I I I , i I I ( )( 100,000 I I 100,000 )( 55,OO~ 45,000 I )( I J( I . TOTAL - - - - - - I - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM ---Eonsc~~ ion_~~~~:.:reat ion I.;,nd ~lanagement . - C()ns~rva~on A~a~_ (Support) (Cl j PAGE ~l) --.- PURPOSE: To admini~ter and Jevclop Authority o\~nl::d conservation lands in 3ccurcance ,.~th the Interim Conscrvllt 10.1': and Recrcat ion I.and \Ianagcmcnt I'lan l1979}. TlI prov Ide <l comprchens i vc program of mana~emcat ;.nd provi sion of outdoor recreat ion opportun it ies thro:Jgh facil ity" improvements and master planning of conservation area:.. 1980 On.JECTIVES: _ to final i zc the Conservat ion ami Recrcat i on l.and ~Ianagcmcnt .:omponcnt of the I~atersi;ed Plan - to develop detailed ~laster Plans for Conservat ion Areas - to administer existing programs and activities FUNUH\G: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being fundcd from the General Levy on all participating municipalities. F r NANC I AL Cm.I.\!E~TS: The 1980 estimates reflect the requirement for additional clerical staff. OB.JECTlVE CL^SSIFICATJONS ~laterial s Salaries Supplies & Real Services Financ ial & I~ages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ S $ $ S $ 153,000 7,600 8,150 - 2,000 - - 170,750 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Consen'at ion & Rc.:reat ion Land ~lanal!emcllt - Con:;L'r\'at ion An'a:; l,:i,uppocr..l-L(1) P;.GE 36. . 1 1980 BUDGET SOURCES OF FINANCING Y 1979 BUDGET r- 1978 ACTUALS , ACTIVITY PROV!NCIt.L I MUNICiP;':'" OTWR I! EXPENDITURES REVE",UES I: EXPS'liDliUFES ~EN'JES I EXPENDITURES I REVENUES EXPEN~TJURES . GRANT LEVY c. I I i I I Staff Salaries 150,000 150,000 75,000 75,000 , i - I - 127,200 - I lO:;.37~ Staff Travel & Expenses 3,600 3,600 1,800 1,800 I 3,240 I 2,0-: I i - - I - I - Vehicles 7,150 7,150 3,575 3,575 I 6,500 I - - I, - I 6,239 - Pond Se;-vice - - - - - - 6,500 I - I 12,5.17 I - I I Wi Idlife & !'ish lIabitat I 10,000 - 10,000 5,000 5,000 - II - - 'I - I - I I I ! I I I' I , I I . ; I I I I I I I I I ! I I ( TOTAL )( 170,750 I - I 170,750 )( 85,375 I 85,375 I - )( 143,500 I - )( 126,235 I - ) PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land ~Ianagement - Conservation Areas (Development) (C1) PAGE )/, PURPOSE: To provide a wide range of outdoor recreational opportunities requiring the natural resources found on Authority lands, through the provision of facilities and ground developments in accordance with thc objectivcs, policies, and concept plans of the proposed Interim Conservation and Recreation Land ~~nagement component of the Watershed Plan. 1980 OBJECTIVES: _ to continue the development of the C1airevi11e Conscrvation Area including expansion of hydro and water services to 58 additional campsites and ground developments in the beach area _ to continue the fish rearing program at the Glen Haffy Conservation Area _ to continue ground developments at the Cold Creek and Black Creek Conservation Areas _ to improve services to the visitors at the Bruce's Mill Conservation Area through provision of additional washroom facilities _ to provide funds for the development of additional site plans FU~DING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. OBJECTIVE CLASSIFICATIO~S: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ , $ $ 35,650 54,250 5,850 - 30,750 - - 126,500 PRELl MINARY 1980 CURRE(\!T BUDGET ESTIMATES Cons,'!'\'at Ion [, Recl"l'at ion LlIld ~i:IIl:I"c'nll.:n 70 PROGRAM . l) 'Illlll'l " P:"GE :'>0, 1980 BUDGET ( SOURCES OF FINANCING , 1979 BUbGET 1978 .....CTUALS I ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL I MUNICIPAL OTHER 1 EXPENDITURES REVEf\:UES EXPE.'lDITURES I REV~f\:~ES EXPENDITURES GRANT LEVY I I I I, I I Albion Hills - - - - I - 750 \ - \i 40,400 - I 17,377 - R l.ld Crcek 1,500 - 1,500 750 I - 1,000 I - 4,949 - I Royd - - - - I 12 ~ 500 I - - - 16,155 - Ilm(:(,'5 ~lil1 25,000 - 25,000 12,500 I - 8,600 - 15,864 - C 1 :, . rev i II e 79,O()() - 79,000 39,500 39,500 I - 3,300 - 73,b27 I - CIa rCI:lOn t - - - 'I - I _ I - 11 - - 6,201 I - I (old Cred, 4,000 - 4,000 2,000 2,000 i - 38,000 - I 18,1>41 I - I; I en lIa ffy 9,000 - 9,000 4,500 4,500 - 8,500 - 18,914 I - Greenwood - - - - - - 3,~OO - 4, ~J,17 - l"e:1 rt I.ake - - - - - - 5,500 - 16,648 - I IOak Ridges - - - - - - - - I 3,724 - Pl'tt ico:lt Creek - ' - - - - - I 8,000 - 15,121 - Clen ~lajor - - - - - , - - - 2,541 - Lake St. (;eorge - - - - - I ! 2,555 - - - - i Studies etc... 5,000 - 5,000 2,500 2,500 - 10,000 - - - General Development 3,000 - 3,000 1,500 1,500 - - - - ! ' - ~1i 1 ne - - - - - - - - - - I . r )( I I )( . I 63,250 I )( I )( I TOTAL 126,500 - 126,500 63,250 - 126,500 - 217,264 - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Reereation Land Managerr~nt - Conservation Areas (Development) (Cll PAGE 38A PURPOSE: To undertake special projects ineluding:- _ the improvement of the cold water fishery on the Duffin Creek in aecordance with a Federal/Provincial strategic planning for Ontario Fisheries Program recommendations _ the rehabilitation of the South Thackeray Landfill Site in accordance with the approved plan 1980 OBJECTIVES: _ to finalize the strategic planning for Ontario Fisheries Program _ to install plant material for the seeond year on the rehabilitation program for the Thackeray Landfill Site FUNDING: The Ministry of Natural Resources have allocated to the Authority a total of $51,000 for addit~onal stream enhancement work to be carried out on private, public and Authority owned lands. $3,000 of this total sum is alloeated for the 1980 Budget. FINANCIAL CO~~NTS: A funding for these two programs will be carried by The Ministry of Natural Resources and the Corporation of the Municipality ot Metropolitan Toronto and will not reflect in the Levies or the provincial Funding for M.T.R.C.A. Programs OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 11 , 000 7,000 1,000 - 4,000 - - 23,000 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Reercdtion Land Hanagemcnt - Conscrvation Areas (Devclopmcnt) (Cl) PAGE 38B ~ 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET 1978 ACTUALS ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER EXPENDITURES REVENUES EXPEt-.:DITURES REVENUES EXPENDITURES GRANT LEVY I I I Special Projects I i Strategic Planning for ! : Ontario Fisheries 3,000 3,000 - - - - 48,000 48,000 - I - I Thackeray Landfill I . Site Revegetation 20,000 20,000 - - - - I 18,000 18,000 I - I - I I i I I I i I . I I , I , I I i , ( TOTAL )( 23,000 I 23,000 I - )( - I - I - )( 66,000 I 66,000 )( - I - ) PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation li Recreation Land ~lanagement - Conservation & Niagara Escarpment Land (C2) PAGE ~9. PURPOSE: To acquire Conservation Area and Niagara Escarpment Lands as set out in the Authority's plan for ancillary conser- vation measures and Niagara Escarpment Land acquisition. The purpose of such acquisitions is to bring into public o~nership environmentally important lands such as source areas, headwater zone river valleys and Oak Ridges interlobate moraine lands. 1980 OB.JECI'IVES: There 1S no provision in the 1980 budget estimates to acquire any land under the program. FUNDfNC: This is a shared program, a 50% grant on Niagara Escarpment lands and Conservation lands is available from the Province of Ontario, the balance being funded from the General Levy on all participating municipalit\es or funds which may be ~,de available through The Metropolitan Toronto and Region Conservation Foundation or through funds raised through Authority revenues. FINANCIAL CO~~IENTS: Funding priorities preclude the allocation of grant aided funds to enable acquisitions under this program in 1980. PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation PAGE 40. f J 1980 BUDGET SOURCES OF FINANCING )( 1979 BUDGET If 1978 ACTUALS ACTIVITY 'XPENDITURES ! R'V'NU'S EXPEN~iJURES PRg~lt',WL MUN~'i:'t~L I DTH'R !EXPENOITURES I REV"UES , EXPENDITURES i REVENUES I I . i I r I :-;iagara Escarpment Land _ _ _ - - I - I - - 18,801 I - : Co"o,,"'oo Area Laod _ _ - - - I - I 48,800 - 430,911 I - I I I I I I II' I I ! I : I , I ! r TOTAL )( - I - I - )(. - I - I - )l 48,800 I - )( 449,712 I - . PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conservation & Recreation Land ~L~nagement - Conservation Arc a Information & Intcrpretive (C3) PAGE 41, PURPOSE: To provide information and interpretivl: programs related to recreation and land m:ma;:cli:cnt in the Authority's' fourteen consen'at ion areas. 1980 OaJECTIVES: To continue the programs carricd out in 1979. FUND[~G: 111i s is a shared program, 50'. of thc funds being available from the Province of Ontario and the b:llancc be' i:1g funded from thc Gencral Levy on all part icipat ing municipali tics. Materials [ OBJECTIVE CLASSIFICATIONS: Salaries Supplies & Real Services financial & Wagcs Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 12,320 3.460 - - 6,900 - - 22,680 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM ConsL'!'\':1tion I; Reel'catlon L:1I111 ~lana"L'ment - COI1Scn:lth'n ,.rea II~f()I'J:I.ltIOI1 I, InterpretIve (C:>) Pf.GE 1.47. 1 1980 BUDGET SOURCES OF-j::INANCING~ ( 1979 BUDGET r- 1978 ACTUALS 1 PROV!NCIAL -j MUNICiPAL I I! EXPENDITuRES I REVEf\;UES , ACTIVITY OTHER i EXPEN!XIU"ES I REVENUES I EXP!::t.:CITURE..$ REVENUES EXPEN~T{URES GRANT ' LEVY I' I I I I " I I I I 'ita ff Sa I ari cs 12,320 12,320 6,160 6,1l>0 I , I - - Ii 11 . 100 I - 10,470 - Publications I, Printing 4,500 j' I 4,500 - 2,250 2,250 I - 3,000 I - I 3.2ll0 I - Tours f, Special Days 2,300 - 2,300 1,150 1,150 - il 2,000 - 1,511 - Photographic Supplies ,i 2,560 I 2,560 1,280 1,280 ! II 2,900 I 3,822 - - - - !I , I I ! j ~Iot ion Picture I'rogrnnl Ii 1,000 - 1,000 500 500 - il 2,000 - 2,293 - ! " i I ! I , I I ; I I I I I I I ! ( )( I I )( . I I )( I )( I ) TOTAL 22,680 - 22,680 11 ,340 11,340 - 21,000 - 2!-,296 - , PRELIMINARY 1980 CURRENT BUDGET ESTIMP:fES PROGRAM Conscrvat ion & Recrcat ion Land ~Ianagcment - Rcnt & Util ity Servcics (C5) PAGE 43. PURPOSE: Provision of administration of the Central Serviccs :md Stores. 1980 OBJECTIVES: _ the prpvision of stock supplies, including purchasing and distribution _ the provision of building and mechanical trades service to all Divisions of the Authority as required FlI:-JO [r\G: This is a sharcd program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalit ies. f I N.\~CI,\L CO~l~IENTS: Adjustrr.ent for 1980 idenifies the realignment of existing staff salaries. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expens es Total $ $ $ $ $ S $ $ 39,880 - - - 3,400 - - 43,280 PRELl MINARY 1980 CURRENT BUDGET 'ESTIMATES ?ROGRAM COllsen":lt ion [, Rent f Utility Servi~cs C5' P.^.GE 44. ~ 1980 BUDGET , T r SOURCIES." ~F ~IN~NCING l( 1979 BUDGET 1978 ,;CTUALS ACTIVITY I. i Exr:E."JJ:T0RES I ~X-t:'NDITUR-" I Rt:'Vt:'NU~S I NE, I PROVINCIAL I ~.JN,CIP~L I OTHeR 'EXPEN~T~RESI REVE~UES REv =XJ::S ! I t. r'~ ::.... ~~. t. EXPE~!DITURES I' GRANT ,~EVY ~ 'I I ' ! : '\ I ,ta ff Salaries 39,880 - '39,880 19,940 119,940 - II 35,930 I - 34,0:'': , - I 'ehicles 3,400 - 3,400 1,700 1,700 - 3,070 - 2,451 I - 11 I i I I I I I I I I I I i ! I I, I I I I I I I I , I I I I I I I II I ; . i \ I I i I I l ( )( I I )( . I I )[ I )[ I ) TOTAL 43,280 - 43,280 21,640 21,640 - 39,000 - 36,503 - PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conscrvation & Recreation Land ~lanagcment - Taxes and Insurance (C6) PAGE 45. PURPOSE: To provicJe for costs associated with taxes on non-revenue producing arcas and liability insurance on Authority lands and facilities under Conservation and Recreation Land Management Programs. FINANCIAL CO~I~IENTS: It appears the spcnding for taxes in this category will be in line with the 1979 budget estimate of $60,000. Therefore, to arrive at a budget for 1980, a 7.0 inflation factor has been added and 5% for addi tiona1 properties, ~o allowance has bee II made for market value assessment incrcases in 1980. HJNDING: This is a sharcd program, 50\ of the funds bcing available from the Province of Ontario and the balance being funded from the Gcneral Levy on all participating municipalities. OBJECT[VE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Nages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ - - - - 10,500 67,500 - 78,000 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Conse rvat ion :; Rcc rea t ion L:md ~lanagelllent - Taxes :lIld Insurance' eel>) PAGE ~. 1980 BUDGET "\ SOURCES OF FINANCING ,( 1979 BUDGET ~7S ;..CTlI.....l.S ACTIVITY EXPENDiTURES REVEr-:UES NET I PROVINCIAL T MUNiCIP~Ll OTH-R \! EXPENDITURES REV Ef\:UES EXPEN~~TU;;'ES fiEVE~~UES EXPENDITURES GRANT LEVY , t:. I I ~I !\ I I Taxes, non-revenue 67,500 67,500 33,750 33,750 I - " 60,000 58,797 - I' - I - Insurance 10,500 10,500 5,250 5,250 i\ 10,000 9,381 i I -, - I' - - I I I I I i I I I I I . j I I ; . , I I I i I i t I . I I ( TOTAL )( 78,000 I - I 78,000 )( 39,000 I 39,000 I - )( 70,000 I - )( 68,178 I - : PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Water & Re lated Land ~I:maj(ement - Watcrfront Proj(rams (Ji9) PAGE 47. PURPOSE: To provide administrative, planning :md enginecring staff necessary for implementing the Waterfront Project. -- FIJ:\DI:\C: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Lcvy on all participating municipalities. OBJECTIVE CL^SSIFIC^TIO~S ~1:1terial s Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expens~s Total $ $ $ $ $ $ $ $ 67,750 - - - 4,000 - - 71,750 PRELl MINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM I\atcr f, Rel:1tcd Land ~lanagement - I~;lterfront Programs (1~9) PAGE 4X, SOURCES OF FINANCING 1979 BUDGET' ( 1973 ACTUALS , 1980 BUDGET I I , ACTIVITY NET PROVINCIAL MUN!C:P~L I EXPENDiTURES REVENUES EXPENDITURES GRANT LEVY OTHER EXPENDITURES REVE:\UES I EXPS'lDITUR::S REVEi\:'J::S I i Staff Salaries 67,750 - 67,750 33,875 33,875 - 62,000 - 55,878 - I Travel & Expenses 4,000 - 4,000 2,000 2,000 i - 4,000 - 3,011 - I , I I I I I I I I I I I j I : I I I I I I I I t I I I I I j I I ( TOTAL )( 71,750 I - I 71,750 )( . 35,875 I 35,875 I - )( 66,000 I - )( 58.8R9 I - ~ PRELIMINARY 1980 CAPITAL BUDGET ESTIMATES PROGRAM Special Projects - Waterfront Plan PAGE 49. PURPOSE: The purpose of the \~aterfront Plan is to create, on the Lake Ontario Shore I ine within the area of the Authon ty I S jurisdiction, a handsome waterfront balanced in its land uses which will complement adjacent areas, taking cogni- zance of existing residential development and making available, wherever possible. features which warrant public use. 1980 OBJECTIVES: _ the completion of the grading and installation of final armouring and arterial servicing as the first phase of surface development at Humber Bay West, Phase II _ the continuation of the landfill project at Bluffer's Phase II and installation of servicing to the boating Federatloll site _ the continuation of development at Humher Bay East in preparation for completion in 1981 _ the continuation or the environmental monitoring program _ the continuation of acquisition of endangered homcs and construction of priority works relating to shoreline management _ the continuation of the regular acquisition program _ thc completion of the approval process for Colonel Samuel Bois Smith Waterfront Area _ the first phases of preparation of the implementation plan for Aquatic Park - the continuation of the regular maintenance program FUNDING: This is a shared program, 50\ of the funds being available from the Province of Ontario and the balance being funded from the Waterfront Capital Levy on all participating municipalities. The Government of Canada has participated in the construction of shore protection at the Small Craft Harbour at Bluffer's Park. It is anticipatcd that the Federal Assistance will continue in 1980. FINANCIAL CO~1I-IENTS: 1980 is the fourth year of the second five year project for Waterfront Development and the estimates are based on anticipated cash flow from the Province of Ontario including $4~6,000 for the Supplementary Waterfront Project, which would be matched by the Municipality of Metropolitan Toronto as benefiting. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Uti! i ties Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 80,000 - - 300,000 2,750,250 - - 3,130,250 PRELl MINARY 1980 CAPITAL BUDGET ESTIMATES PROGRAM SpecIal Projects - ~aterfront Plan P:>.GE ,{) 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ( 1978 ACTlJALS 1 ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNIC!PAL I OTHER I EXPENDITURES REVENUES I EXPENDITUfiES I REVEN:JES EXPENDITURES GRANT LEVY I I I , !lumber Bay West 950,250 - 950,250 475,125 475,125 - 160,000 - 39S,h32 - t lIumber Bay East 400,000 - 400,000 200,000 200,000 - 950,000 - 381,305 - I I l~estern Beaches - - - - - - 5,000 - 42,698 - I ^shbridge's Bay 40,000 40,000 20,000 20,000 I I 5,000 67,b83 I - - - - I i I Bluffer's - I I; II 660,000 - 660,000 330,000 330,000 - ! 740,000 - 374,230 I - I I East Po int Park - - - - - - 20,000 - 46,255- - Environmental Studies j and ~lon i tor i ng 100,000 - 100,000 50,000 50,000 - 60,000 - 96,880 I - , Sh~I'el ine ~1anagement 600,000 - 600,000 300,000 300,000 - 450,000 - 167,637 - Staff Salaries 80,000 - 80,000 40,000 40,000 - 50,000 - 56,304 - Land Acquisition 150,000 - 150,000 75,000 75,000 - 240,000 - 9,751,919 - ~bJlJling - - - - - - - - 539 I - J Col. S. B. Smith 50,000 - 50,000 25,000 25,000 - 50,000 - 86,881 - I Pett icoat Creek - - - - - - 20,000 - 16,030 - I ~la intcnance 50,000 - 50,000 25,000 25,000 - 50,000 - - - I Aquatic Park 50,000 - 50,000 25,000 25,000 - - - - - 3,130,250 1,565,125 1,565,125 2,800,000 11,486,993 I i 3,130,250 - - - - I I . Adjustments to Levy to match expenditures and Provincial Grants 1977 (114,579) 1978 293,497 1979 6,490 ( TOTAL )( I I )( 1:565,125 11,750,533 I )( t )( I ~ PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM Historical Sites Development PAGE 51. PURPOSE: To carry out restoration and development work at the Black Creek Pioneer Village in accordance with approved plans. 1980 OB.JECTIVES: To complete the restoration of the Richmond Hill Manse. FUNDING: The Metropolitan Toronto and Region Conservation Foundation, Wintario and donations. FI~A.";CIAL CmNE:-ITS: Work will proceed as funds become available. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 10,000 6,000 - - 30,000 - - 46,000 PRELIMINARY 1980 CURRENT BUDGET ESTIMATES PROGRAM lIistoric Sites Development PAGE --52. 1980 BUDGET SOURCES OF FINANCING 1979 BUDGET ~1978 ACTUAL~ ACTIVITY EXPENDITURES REVENUES NET PROVINCIAL MUNICIPAL OTHER ' EXPENDITURES REVE;\lUES EXPENDITURES REVENLJES EXPENDITURES GRANT LEVY Rob I in' s ~Ii 11 - - - - - - 1,000 - - - Boardwalk -, - - - - - 1,000 - 2,453 - Doctor's House - - - - - - - - 23,568 - ~1cllnonitc ~lccting /Iall - - - - - I - - - 8 I - Taylor Cooperage - - - - - - 30,000 - 185 - Sawyer's /louse - - - - - - 12,000 - - , - I Richmond /Iill ~1anse 46,000 - 46,000 - - 46,000 10,000 - 13,(>71 i - I B.C.P.V. Visitors Centre - - - - - - - - 10,897 I - I J Collection - - - - - I - 6,000 - 775 I - i I i I I I I i , i I I t I ( TOTAL )( 46,000 I - I 46,000 )( - I - I 46,000 )( 60,000 I - )L!1,557 I - ) THE f1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY 1981-1984 MULTI-YEAR FORECAST OCTOBER 3, 1979 (/) 0 :I: t1j C c:: t" t1j tJ:I :z I o w . IV -..I 1981-1984 MULTI-YEAR FORECAST I N D E X PAGE(S) PAGE(S) A & B Report Water & Related Land Management 1 Surranary 29 - 36 Interim Project SUM!i':ARIES 37 & 38 Supplementary Project - Keating Channel 2 Expenditures Conservation & Recreation Land Management Sources of Financing 39 & 40 Conservation Areas - Support 3 Revenues 4 Provincial Grants (Min. of Natural Resources) 41 & 42b Conservation Areas - Development 5 Provincial Grants (Min. of Culture & Recreation) 43 & 44 Conservation & Niagara Escarpment Land 6 Municipal Levies 45 & 46 Information & Interpretive Program 7 Foundation (includes Wintario) 47 & 48 Rent & Utilities 8 School Boards 49 & 50 Taxes and Insurance 9 Other Waterfront DETAILS 51 & 52 Waterfront - Support Administration Special Projects 10 & 11 Administration 53 & 54 Waterfront Plan Operations & Maintenance Historic Sites 12 & 13 General Operations 14 & 15 Conservation Area Operations 55 & 56 Historic Sites Development 16 & 17 Information & Education Operations 18 & 20 Black Creek Pioneer Village Water & Related Land Management 21 & 22 Operations & Maintenance of W.C. Structures 23 & 24 Community Relations - Support 25 & 26 Community Relations - Development 27 & 28 Taxes and Insurance THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY A, 1981-1984 MULTI-YEAR FORECAST ~ INTRODUCTION The Multi-Year Forecast for the four years 1981 to 1984 has been prepared at the request of the Province of Ontario. The revised format shows the preliminary estimates for 1980. The stated objectives of the Multi-Year Forecast are:- (1) To encourage Authorities to plan their activities for the period and to establish priorities. (2) To provide the Province with Authority plans for the period, expressed in dollars with identification of projects having highest priority. (3) To provide an equitable basis for the allocation of Provincial funds. In corr.p1eting the Multi-Year Forecast, Authorities are requested to ensure that;- (1) Provision has been made for all currently planned projects within the planning period. (2) Cost estimates are realistic and projects are economically feasible. (3) Priority and timing of projects is realistic considering the need for prior technical and funding approvals, land acquisition, engineering etc... (4) Funds for the Authority share of expenditures can be raised without undue difficulty. AUTHORITY PURPOSE, ACHIEVEMENTS AND OBJECTIVES The Metropolita~ Toronto and Region Conservation Authority has adopted a program designed to further the conservation, restoration, development and management of the natural resources of the 1,339 square miles included in the Authority's area of jurisdiction. The Authority has identified the region's river valleys, the Lake Ontario shoreline and the headwater areas of the Oak Ridges interlobate moraine, and the Niagara Escarpment as the major resources to which its programs are applied. B, Established resource management programs include flood control and water conservation, erosion control, waterfront develop- ment, and fish and wildlife management. In implementing these programs, 26,534 acres of land have been acquired and, in addition to their being managed for the conservation functions they perform, they are made available to the community for outdoor and conservation education, recreation and historic site purposes. Within these comprehensive program guidelines, the Authority has, over the years, reflected the priorities and policies of the partners, the participating municipalities and the Province of Ontario as expressed through the,respresentative Authority members. Since 1957, 61% of the Authority's capital and development budget has been devoted to Water and Related Land Managemen t . 25% has been devoted to Lake Ontario shoreline management, 12% to Conservation and Recreation Land Management and 2% to Outdoor and Conservation Education. The 1981-1984 Hu1ti-Year Forecast for administration, operations and maintenance, current and capital programs reflect the emphasis on Flood Control and Hater Conservation, Waterfront Development and provide for the management of lands a:ld facilities acquired and developed in connection with this program. FOR}~T OF PRESENTATION The 1981-1984 Hulti-Year Forecast has been prepared in accordance with the requirements of the Ministry of Natural Resources "Policy, Procedures and Information Manual for Conservation Authorities" with respect to Administration, Water and Related Land Management and Conservation and Recreation Land Management. Anticipated cost levels for 1980 have been used throughout the Forecast. An inflation factor will be added by the Ministry of Natural Resources in accordance with allowances approved by Management Board. PROVINCIAL FUNDING Administration 50% Water and Related Land Management 55% Conservation and Recreation Land Management 50% Waterfront Project 50% THE r1ETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -L- MULTI-YEAR FORECAST 1981-1984 SUMMARY 1980 EXPENDITURES 1979 Budget Pre. Budget 1981 1982 1983 1984 Administration 1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 1,449,160 Operations & Maintenance 3,230,800 3,945,500 4,133,800 4,176,800 4,233,300 4,278,300 Water & Related Land Management 1,092,194 1,226,560 1,160,520 978,220 944,620 964,720 Interim Water Project 3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 ~,210,500 Supplementary Project - Keating Channel - 100,000 133-,000 200,000 200,000 433,000 Conservation & Recreation Land Management 514,800 464,210 512,310 562,310 543,510 530, 910~' Waterfront - Support 66,000 71,750 71,750 71,750 71,750 71,750 Waterfront - Capital 2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000 Historic-Sites Development 60,000 46,000 750,000 - - - 12,709,757 14,176,230 15,239,290 15,703,740 16,242,840 16,538,340 SOURCES OF FINANCING Revenues 2,412,200 3,072,770 3,273,335 3,284,835 3,323,835 3,351,835 Provincial Grant (Min. of Natural Resources) 4,606,195 5,029,643 5,273,171 5,909,906 6,212,526 6,359.431 Provincial Grant (Min. of Culture & Recreation) 90,000 97,000 102,000 102,000 102,000 102,000 Municipal Levy 5,077,368 5,530,817 5,630,784 6,286,999 6,534,479 6,655.074 Foundation (includes Wintario) 281,472 336,000 200,000 110,000 60,000 ' 60,000 School Boards 171,722 100,000 - - - - Other 70,800 10,000 760,000 10,000 10,000 10,000 12,709,757 14,176,230 15,239,290 15,703,740 16,242,840 16,538,340 THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: --L- MULTI-YEAR FORECAST 1981-1984 EXPENDITURES 1980 ADMINISTRAJ'ION 1979 Budget Pre. Budget 1981 1982 1983 1984 Administration 1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 1,449,160 OPERATIONS & ~\INTENANCE General Operations 112,000 116,200 116,200 116,200 116,200 116,200 Conservation Ar~a Operations 1,370,800 1,696,000 1,704,400 1,707,400 1,723,900 1, 728,900 Community Relations & Education 859,000 1,100,400 1,219,400 1,259,400 1,299,400 1,339,400 Black Creek Pioneer Village 889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,300 3,230,800 3,945,500 4,133,800 4,176,800 4,233,300 4,278,300 WATER & RELATED LAND MANAGEMENT Operations & Maintenance of W.C. Structures 184,000 209,940 205,000 208,000 209,000 213,000 Co~~unity Relations - Support 239,000 278,120 286,120 286,120 286,120 286,120 Community Relations - Development 471,194 459,000 376,000 176,000 126,000 126,000 Taxes & Insurance 198,000 279,500 293,400 308,100 323,500 339,600 1,092,194 1,226,560 1,160,520 978,220 944,620 964,720 INTERIM WATER PROJECT Water Control Projects 92,500 117,350 117,350 132,500 132,500 132,500 Regulations 182,500 199,640 199,640 200,000 200,000 200,000 Conservation Services 208,000 258,950 270,000 280,000 290,000 300,000 All Benefiting 1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 3,753,000 Benefiting Municipalities 1,776,690 1,645,300 1,783,500 825,000 825,000 825,000 3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 5,210,500 Expenditures - PU8C 12 KEATING CHANNEL KeJ.till<j ChLlnlwl - 100,000 133,000 200,000 200,000 433,000 CONSr.nVATTON " RECRET\'J'TON Ll\ND Ml\Nl\GEMENT ---- --- Conservation Areas - Support 143,500 170,750 170,750 170,750 170,750 170,750 ConscrvJ.tion Arcas - Devclopment 126,500 126,500 154,000 200,000 200,000 200,000 C~~servation Areas - Development 66,000 23,000 40,000 40,000 17,000 - CO:lscrvation &. Niagara Escarpment Land 48,800 - - _ _ _ Information &. Interpretive 21,000 22,680 22,680 22,680 22,680 22,680 Rent &. Utilities 39,000 43,280 43,280 43,280 43.280 43,280 Taxes &. Insurance 70,000 78,000 81,600 85,600 89,800 94,200 514,800 464,210 512,310 562,310 543,510 530,910 WATERFRONT Waterfront - Support 66,000 71,750 71,750 71,750 71,750 71,750 Waterfront - Capital 2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000 HISTORIC SITES Historic Sites Development 60,000 46,000 750,000 _ _ __ _ Total Current 6,763,794 7,753,690 8,580,540 7,850,740 7,864,840 7,927,340 Total Capital 5,945,963 6,422,550 6,658,750 7,853,000 8,378,000 8,611,000 12,709,757 14,176,230 15,239,290 ,15,703,740 16,242,840 16,538,340 THE fiETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ---3..- MULTI-YEAR FORECAST 1981-1984 REVENUES I 1980 ADmNISTRA:.rIO~ 1979 Budget Pre. Budget 1981 1982 1983 1984 Administration 70,000 70,000 70,000 70,000 70,000 70,000 OPERATIONS & ~~.INTEN^NCE General Operations 16,500 16,500 16,500 16,500 16,500 16,500 Conservation Area Operations 710,000 982,335 985,300 985,300 997,300 997,300 Community Relations & Education 757,700 989,235 1,113,235 1,158,235 1,203,235 1,248,235 Black Creek Pioneer Village 750,000 888,900 949,800 949,800 949,800 949,800 2,234,200 2,876,970 3,064,835 3,109,835 3,166,835 3,211,835 HATER & RELATED LJ._l\m HANAGE~lENT Operations & Maintenance of W.C. Structures - - - - - - Community Relations - Support - - - - - - Community Relations - Development - - - - - - Taxes & Insurance - - - - - - - - - - - - INTERIM WATER PROJECT Water Control Projects - - - - - - Regulations - - - - - - Conservation Services 15,000 62,500 65,000 65,000 70,000 70,000 All Benefj..ting - - - - - - Benefiting Municipalities 27,000 40,300 33,500 - - - 42,000 102,800 98,500 65,000 70,000 70,000 Revc~ues - Pg. #2 KEi\TI~G CP_;N~~EL 'I ] Keating Channel - - - - - - CO:JSERVl\TION & RECREl\TION Ll\ND Hl\Nl\GE[>'lENT Conservation Areas - Support - - - - - - Conservation Areas - Development - - - - - - Conservation Areas - Development 66,000 23,000 40,000 40,000 17,000 - Conservation & Niagara Escarpment Land - - - - - - Information & Interpretive - - - - - - Rent & Utilities - - - - - - Taxes & Insurance - - - - - - I 66,000 23,000 40,000 40,000 17,000 - WATERFRONT Waterfront - Support - - - - - - Waterfront - Capital - - - - - - HISTORIC SITES Historic Sites Development - - - - - - - Total Current 2,385,200 3,032,470 3,239,835 3,284,835 3,323,835 3,351,835 Total Capital 27,000 40,300 33,500 - - - 2,412,200 3,072,770 3,273,335 3,284,835 3,323,835 3,351,835 THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ~ MULTI-YEAR FORECAST 1981-1984 PROVINCIAL GRANTS - f1INISTRY OF NATURAL RESOURCES 1980 AD!1InSTR.lrrON 1979 Budget Pre. Budget 1981 1982 1983 1984 Auministration 638,500 714,580 689,580 689,580 689,580 689,580 OPERATIO~S & ~L\INTE~ANCE General Operations - - - - - - Conservation Area Operations - - - - - - Co~unity Relations & Education - - - - - - Black Creek Pioneer Village - - - - - - - - - - - - ~,lATER & RELATED L&m MANAGEHENT Operations & Maintenance of W.C. Structures 101,200 115,467 112,750 114,400 114,950 117,150 Co~~unity Relations - Support 131,Lf50 152,966 157,366 157,366 157,366 157,366 Co~unity Relations - Development 41,800 41,800 151,800 41,800 41,800 41,800 Taxes & Insurance 108,900 153,725 161,370 169,455 177,925 186,780 383,350 463,958 583,286 483,021 492,041 503,096 INTERIM HATER PROJECT Water Control Projects 50,875 64,543 64,543 72,875 72,875 72,875 Regulations 100,375 109,802 109,802 110,000 110,000 110,000 Conservation Services 106,150 108,047 112,750 118,250 121,000 126,500 All Benefiting 736,600 809,358 840,405 1,775,400 2,064,150 2,064,150 Benefiting Municipalities 957,345 882,750 962,500 453,750 453,750 453,750 1,951,345 1,974,500 2,090,000 2,530,275 2,821,775 2,827,275 Provincial Grants - M.N,R. - Page #2 KEATI~'lG CHM1NEL Keating Channel - 55,000 73,150 110,000 I 110,000 238,150 CO~SERVATIO~ & RECREATION LAND MANAGEMENT ! I Conservation Areas - Support 71,750 85,375 85,375 85,375 85,375 85,375 I Conservation Areas - Development 63,250 63,250 77,000 100,000 100,000 100.000 Conservation & Niagara Escarpment Land _ _ _ _ _ _ Information & Interpretive 10,500 11,340 11,340 11,340 11,340 11,340 Rent & Utilities 19,500 21,640 21,640 21,640 21,640 21,640 Taxes & Insurance 35,000 39,000 40,800 42,800 44,900 47,100 200,000 220,605 236,155 261,155 263,255 265.455 WATERFRONT Waterfront - Support 33,000 35,875 35,875 35,875 35.875 35.8751 Waterfront - Capital 1,400,000 1,565,125 1,565,125 1,800,000 1,800.0001 1,800,000 HISTORIC SITES Historic Sites Development _ _ _ _ _ __ _ Total Current 1,495,750 1,675,918 1,785,796 1,770,756 1,784,626 1,803,381 Total Capital 3,110,445 3,353,725 3,487,375 4,139,150 4,427,900 4,556,050 4,606,195 5,029,643 5,273,171 5,909,906 6,212,526 6,359,431 THE f1ETROPOLITAN TORONTO AND R: l.IOj~ COfJSERVATION AUTHORITY PAGE: ---5- r-1ULTI-YEAR FJWt'.bT 1~Gl-1984 - - -- PROVINCIAL GRANTS - MINISTRY OF CULTURE & RECREATION --- . ,_. I I (JOO AD:,:r:nSTRArrO:-l 1979 BudgL'!_ ,'n:. Budget :1.981 1982 1983 1984 Administration - , - - - - - OPERl..TIO~S & HAI~TE~ANCE I Genc~a1 Operations - - - - - - I Conservation Area Operations - - - - - - Coc~unity Relations & Education 18,000 25,000 30,000 30,000 30,000 30,000 Black Creek Pioneer Village 72,000 72 , 000 72 , 000 72 , 000 72 . 000 72 , 000 90,000 97,000 102,000 102,000 102,000 102,000 \.!ATEK f., RELATED L/\ND HANAGE:'![NT Ope~ations & Maintenance of W.C. Structures - - - - - - Corr~unity Relations - Support - - - - - - Community Relations - Development - - - - - - Taxes & Insurance - - - - - - I INTERIM WATER PROJECT - : - - - - - I Water Control Projects - - - ' - - - Regulations - - - - - - Conservation Services - - - - - - All Benefiting - - - - - - Benefiting Municipalities - - - - - - - I - - - - - Provincial Grants - Min. of Culture & Rec. - Pg. it2 KEATING CHAN~EL Keating Channel - - - - - - CONSERVATION & RECREATION L~ND MANAGEMENT Conservation Areas - Support - - - - - - Conservation Areas - Development - - - - - - Conservation & Niagara Escarpment Land - - - - - - Information & Interpretive - - - - - - Rent & Utilities - - - - - - Taxes & Insurance - - - - - - - - - - - - WATERFRONT I Waterfront - Support - - - - - - Waterfront - Capital - - - - - - HISTORIC SITES HistorLc Sites Development - - - - - -- - Total Current 90,000 97,000 102,000 102,000 102,000 102,000 - Total Capital - - - - - - 90,000 97,000 102,000 102,000 102,000 102,000 THE rlETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -E..- MULTI-YEAR FORECAST 1981-1984 MUNICIPAL LEVIES 1980 ADMINISTRA'i'ION 1979 Budget Pre. Budget 1981 1982 1983 1934 !~df.1inis trat ion 638,500 714,580 689,580 689,580 689,580 689,580 OPEPATIONS & M^I~TE~ANCE General Operations 85,500 89,700 89,700 89,700 89,700 89,700 Conservation Area Operations 660,800 713,665 719,100 722,100 726,600 731,600 Community Relations & Education 73,300 79,165 66,165 61,165 56,165 51,165 Black Creek Pioneer Village 67,000 72 ,000 72 ,000 72 ,000 72,000 72 ,000 886,600 954,530 946,965 944,965 944,465 944,465 I,JATER & RELATED LAND MA~AGEME~T Operations & Maintenance of W.C. Structures 82,800 94,473 92,250 93,600 94,050 95,850 Co~~unity Relations - Support 107,550 125,154 128,754 128,754 128,754 128,754 Community Relations - Development 34,200 34,200 34,200 34,200 34,200 34,200 Taxes & Insurance 89,100 125,775 132,030 138,645 145,575 152,820 313,650 379,602 387,234 395,199 402,579 411,624 E;TERIM 1.IATER PROJECT Water Control Projects 41,625 52,807 52,807 59,625 59,625 59,625 Regulations 82,125 89,838 89,838 90,000 90,000 90,000 Conservation Services 86,850 88,403 92,250 96,750 99,000 103,500 All Benef~ting 602,673 662,202 687,605 1,452,600 1,688,850 1,688,850 Benefiting Municipalities 792,345 722,250 787,500 371,250 371,250 371,250 1,605,618 1,615,500 1,710,000 2,070,225 2,308,725 2,313,225 . _n. Levies - Page 112 I KEATING Cfu\NNEL I I Keating Channel - 45,000 59,850 90,000 90,000 19/f.850 I I CONSERVATION & RECREATION LAND MANAGEMENT I Conservation Areas - Support 71,750 85,375 85,375 85,375 85,375 85,375 Conservation Areas - Development 63,250 63,250 77 , 000 100,000 100,000 100,000 Conservation & Niagara Escarpment Land - - - - - - I Infor~ation & Interpretive 10,500 11 , 340 11 , 340 11,340 11 , 340 11,340 I Rent & Utilities 19,500 21,640 21,640 21,640 21,640 21,640 Taxes & Insurance 35,000 39,000 40,800 42,800 44,900 47,100 200,000 220,605 236,155 261,155 263,255 265,455 WATERFRONT Waterfront - Support 33,000 35,875 35,875 35,875 35,875 35,875 Waterfront - Capital 1,400,000 1,565,125 1,565,125 1,800,000 1,800,000 1,800,000 HISTORIC SITES Historic Sites Development - - - - - - - - Total Current - 2,268,850 2,502,292 2,492,909 2,573,149 2,584,379 2,600,124 Total Capital 2,808,518 3,028,525 3,137,875 3,713,850 3,950,100 4,054,950 5,077 ,368 5,530,817 5,630,784 6,286,999 6,534,479 6,655,074 THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: -1......- MULTI-YEAR FORECAST 1981-1984 FOUNDATION (INCLUDES WINTARIO) 1980 AmUNISTRA:.rION 1979 Budget ?re. Budget 1981 1982 1983 1984 Administration - - - - - I - O?ERATIONS & HAINTENANCE General Operations - - - - - - Conservation Area Operations - - - - - - Community Relations & Education 5,000 7,000 10,000 10,000 10,000 10,000 Black Creek Pioneer Village - - - - - - 5,000 7,000 10,000 10,000 10,000 10,000 t,.lATER & RELJ\TED LAND MANAGE1.IENT Operations & Maintenance of W.C. Structures - - - - - - Cor:~unity Relations - Support - - - - - - Community Relations - Development 216,472 283,000 190,000 100,000 50,000 50,000 Taxes & Insurance - - - - - - 216,472 283,000 190,000 100,000 50,000 50,000 INTERIM WATER PROJECT Water Control Projects - - - ' - - - Regulations - - - - - - Conservation Services - - - - - - All Benefi t ing - - - - - - Benefiting Municipalities - - - - - - - - - - - - Fou~dation-Wintario - Pg. #2 KEATING CI!A:mEL Keating Channel - - - - - - Cm:S::RVAT~O:i & RECREATION LAND K';'NAGEl-:ENT ,I Co~servat~on Areas - Support - - - - - - Conservation Areas - Development - - - - - - I Conservation & Niagara Escarpment Land - - - - - - I Infor~ation & Interpretive - - - - - - Rcr.t & Utilities - - - - - - Taxes & Insurance - - - - - - - - - - - - WATERFRONT Waterfront - Support - - - - - - Waterfront - Capital - - - - - - HISTORIC SITES Historic Sites Development 60,000 46,000 - - - __ - Total Gurrent 281,472 336,000 200,000 110,000 60,000 60,000 Total Capital - - - - - - 281,472 336,000 200,000 110,000 60,000 60,000 THE rlETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: --1L nUL TI - YEAR FORECAST 1981-1984 SCHOOL BOARDS 1980 ADHINISTRArION 1979 Budget Pre. Budget 1981 1982 1983 1984 Administration - - - - - - O!'ERATIONS & HAI~TEl'lANCE General Operations - - - - - - Conservation Area Operations - - - - - - Comnunity Relations & Education - - - - - - Black Creek Pioneer Village - - - - - - I W,TER & REU,TED LA:lD HANAGEMENT - - - - - - Operations & !':aintenance of H.C. Structures - - - - - - Co~~unity Relations - Support - - - - - - Community Relations - Development 171,722 100,000 - - - - Taxes & Insurance - - - - - - 171,722 100,000 - - - - INTERIM HATER PROJECT Water Control Projects - - - - - - Regulations - - - - - - Conservation Services - - - - - - All Benefiting - - - - - - Benefiting Munici~a1ities - - - - - - - - - - - - School Boards - Pg. /12 KEATU;C ClL\:mEL Keating Ch<::.nnel - - - - - - CmiSS?.VATION & RECREATION Lt"ND HANAGEMENT Conservation Areas - Support - - - - - - Conservation Areas - Development - - - - - - Conservation & ~iagara Escarpment Land - - - - - - I Information & Interpretive - - - - - - I Rent & Utilities - - - - - - Taxes & Insurance - - - - - - - - - - - - HATERFRONT Waterfront - Support - - - - - - Waterfront - Capital - - - - - - HISTORIC SITES Historic Sites Development - - - - - - - - Total Current 171,722 100,000 - - - - Total Capital - - - - - - 171,722 100,000 - - - - THE flETROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY PAGE: ---9.- r'1ULTI -YEAR FORECAST 1981-1984 OTHER - 1980 ADMmISTRA:rION 1979 Budget Pre. Budget 1981 19"&2 1983 1984 Administration - - - - - - OPEP~TIO~S & ~~INTF.NANCE General Operations 10,000 10,000 10,000 10,000 10,000 10,000 Conservation Area Operations - - - - - - Community Relations & Education 5,000 - '- - - - Black Creek Pione8r Village - - - - - - 15,000 10,000 10,000 10,000 10,000 10,000 HATER & .REL'\TED LAND !-'.ANAGEl'1ENT Operations & Maintenance of W.C. Structures - - - - - - Co~~unity Relations - Support - - - - - - Community Relations - Development 7,000 - - - - - Taxes & Insurance - - - - - - 7,000 - - - - - INTERIl1 HATER PROJECT Water Control Projects - - - - - - Regulations - - - - - - Conservation Services - - - - - - All Benefiting - - - - - - Benefiting Municipalities - - - - - - - - - - - - Oth;:!r - Pg. il2 KEA TING CH.....t,~:::L I I Keating Channel - - - - - - CONSERVATION & RECREATION LAND ~~NAGEMENT Conscrv3t:on Areas - Support - - - - - - Co~servation Areas - Deve1opoent - - - - - - Conservation & Niagara Escarpment Land 48,800 - - - - - I Information & Interpretive - - - - - - Rent & Utilities - - - - - - Taxes & Insurance - - - - - - 48,800 - - - - - I WATE~?RO;-JT I Waterfront - Support - - - - - - Watecfront - Capital - - - - - - HISTORIC SITES Historic Sites Development - - 750,00C - - - -- Total Current 70,800 10,000 760,00C 10,000 10,000 10,000 . Total Capital - - - - - - 70,800 10,000 760,00C 10,000 10,000 10,000 1981-1984 MULTI-YEAR FORECAST PAGE: ~ PROGR~M: Administration PURPOSE: To provide the administrative and financial services of the Authority. Sa1a(ies of senior administrative staff and associated secretarial, administrators, the Finance and Property & Administration Divisions are charged to this Program. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. f'iULTI-YEAR FORECAST 1981-1984 P!\O::;"-.-\2-:: AC::-.inistradon P.~.GE: ..J..L I I I 1980 I I I ' : I F I :i .;, ~ C ! :~ G 1979 Eud[',et Pre. J3udp..ct I 1901 1982 1923 I l' :-,., ',.. _. , 1 3/-7 000 ! 1 '99 16~ " 1 4/9 l'O! 1 '49 l'O! 1 '/0 1'0 I 1 1 '. ' ... ~.' .... _ . ~ ~ r.......... . ' I I . . l.. , I l . r, ,_..p,-,..~~~_~t;;~ .,.,........,........,...,...,',.... I ,II, i ,~ , U I ,! 0 I ,'+ ,.) I _,"'T~", 0 I ,..,.,).1.(;,. I i ;{CVc:r:~2.> .,..,.,........,........................ 70,000 I 70,000 I 70,000 I 70,000 i 70,000; 7u,GOO i I :-:2t i:::qencitur:es .......,...................... 1,277,000 1,429,160 I' 1,379.160 I 1,379,160 1,379,160: 1,:;:'9,ltJ)' I , : !, I II C:<:r.ts .......................................... 638,500 714.580 I 6d9,530 689,)80 I 63~.580 I 689,53" I C:he:::: .',. - - I - - i - : - ' II Levy ..,..::::::::::::::::::::::::::::::::::::::: 638,500 I 71L!, 580 689,580 \ 689,530 I 689,530!. 639,580, I , , I -~ 1,277,000 1,429,160 1,379,160 1,379,160 1,379,160 I 1,379,160 J I I I I I ! I 17 "IJ<'\'[) r""'''17'' I ' I ~."I.. .... ~,ul'..J I I i S.,laries 560,150 621,610 621,610 621,610 I' 621,610 I 621,610 I I Employee Benefits 4lfO, 500 460,500 460,500 460,500 460,500. 460,500 I I Tt:ave:l Expenses 97,500 98,000 98,000 98,000 I 98,000 I 98,000 ' I Equipment: Purchase & Rental 36,000 36,400 36,400 36,400 I 36,400! 36,400 I t~tcrinls & Supplies 81,500 89,600 89,600 89,600 . 89,600 89,600 I Rent & Utility Services 77,250 82,650 82,650 82,650 82,650 82,650 General Expenses 54,100 60,400 60,400 60,400 60,400 60,400 l Management Study - 50,000 - - - - I 1,347,000 1,499,160 1,449,160 1,449,160 1,449,160 .1,449,160 i I I ! I 1981-1984 MULTI-YEAR FORECAST PAGE: _JL. PRGGRAf.1: Operations & Maintenance - Genera~ Operations PURPOSS: To p~ovide administrative support services, for which a Provincial Grant is not available. 1981-1984 OBJECTIVES: - to fund the maintenance of revenue producing properties and other general maintenance - to fund the public liability insurance on vehicles and equipment - to fund renovations to th.:! Head Office Administration Building - to fund ~he office cleaning. and maintenance - to fund the Authority's share of vehicles and equipment FUND ING : Program revenues, the General Levy on all participating municipalities and Authority funds. MULTI-YEAR FORECAST 1981-1984 PROGP.A:-! : Operations & Maintenance - General Operations P':'.GE: JL.. 1980 1 FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984 Expenc.itures .................................... 112,000 116,200 116,200 116,200 116,200 116,200 I Revenues ........................................ 16,500 16,500 16,500 16,500 16,500 I 16,500 ' Net Expenditures .............................. 95,500 99,700 99,700 99,700 99,7001 99.700 Grants .......................................... - - - - - - Ocher.......................................... . 10,000 10,000 10,000 10,000 10,000 10,000 Levy........................................... . 85,500 89,700 89,700 89,700 89,700 89,700 95,500 99,700 99,700 99,700 99,700 99,700 EXPENDITURES Rental Property Haintenance - Revenue Producing Properties & General Maintenance 32,500 27,500 27,500 27,500 27,500 27,500 Vehicle & Equipment Suspense 5,000 5,000 5,000 5,000 5,000 5.000 Insurance 12,000 12,850 12,850 12,850 12,850 12,850 Head Office Renovations 10,000 10,000 10,000 10,000 10,000 10,000 Flood Control Workshop 1,500 2,000 2,000 2,000 2,000 2,000 Office Cleaning 19,000 ~0,300 20,300 20,300 20.300 20,300 Office Maintenance 32,000 38,550 38,550 38,550 38,550 38,550 Bank Interest - Non-Capital Programs - - - - - - . 112,000 116,200 116,200 116,200 116,200 116,200 1981-1984 MULTI-YEAR FORECAST PAGE: ~ PROGRAM: Operations and Maintenance - Conservation Area Operations PURPOSE: The conservation and man~gement of the lands under the jurisdiction of the Authority and the provision of outdoor recreation opportunities. 1981-1984 OBJECTIVES: The management and operation of 18,000 acres of Authority lands, including 13 conservation areas, which will provide 1.5 million user days of recreation for each operating year. To provide recreation programs which will provide additional recreational opportunities in selected conservation areas. To provide for increased maintenance required as a result of the continued development of facilities in conservation areas. FUNDING: Program revenues and the General Levy on all participating municipalities. No Provincial Grant is available for this program. Throughout the Forecast, increases in revenues and expenditures at Albion Hills, Bruce's Mill, Cold Creek, Heart Lake and Petticoat Creek reflect increased recreation programs. Expenditure and revenue increases at Claireville result from the expansion of the campground. FINANCIAL COMP~NTS: An increased recreation program is reflected in expenditures and revenues. These programs are self supporting with some net revenue resulting. There fore, any decrease in revenue would result in a similar decrease in expenditures. Because costs of labour and materials will continue to rise during the Forecast period, a general fee increase will be required to retain the General Levy increases at an acceptable level. It is anticipated that this will occur in 1983. MULTI-YEAR FORECAST 1981-1984 PP.aG?,-~';: Operations & Mainten~nce - Conservation Area Operations PAG=:: --.J5..... 1980 FIN A N C I N G 1979 Budget Pre. Budget 1981 1932 1983 1934 Expendic:u:-es ......................:............. 1,370,800 1,696,000 1,704,400 1,707,400 1,723,900 1,728,900 Revenues ........................................ 710,000 982,335 985,300 985,300 997,300 997,300 I ~et Ex?endicures .............................. 660,800 713,665 719,100 722,100 726,600 731,600 I Grants .......................................... - - - - - I - I 0-1-- ~r . - - - - 726 ~ 600 I - E:::::::::::::::::::::::::::::::::::::::: : 660,800 713,665 719,100 722,100 731,600 660,800 713,665 719,100 722,100 726,600 731,600 EXPENDITURES Albion Hills 233,000 275,850 276,000 276,000 278,000 280,000 Boyd 137,000 151,400 152,000 152,000 152,000 152,000 Bruce's Mill 161,000 224,600 225,000 225,000 226,000 226,000 Claremont 50,000 56,650 57,000 57,000 57,000 57,000 Clairevi11e 179,000 248,050 250,000 252,000 255,000 253,000 Cold Creek 92 , 000 130,950 131,000 132,000 135,000 135,000 Glen Haffy 84,500 96,850 97,000 97,000 97,000 97,000 Greenwood 103,000 115 ,900 116,000 116,000 116,000 116,000 Heart Lake 129,500 150,250 150,500 150,500 153,000 153,000 Humber Trails 9,000 10,200 10,200 10,200 10,200 10,200 Hi1ne 7,800 - - - - - Pa1grave 9,000 14,150 14,200 14,200 14,200 14,200 Service Area 17,000 21,400 21,400 21,400 21,400 21,400 Hoodbridge . 8,000 9,100 9,100 9,100 9,100 9,100 Petticoat Creek 151,000 190,650 195,000 195,000 200,000 200,000 Visitors Servic~s - - - - - - 1,370,800 1,696,000 1',704,400 1,707,400. 1,723,900 1,728,900 1981-1984 MULTI-YEAR FORECAST PAGE: --1h. PROGRAM: Operations and Maintenance - Information and Education Operations PURPOSE: To provide an outdoor and conservation education program for school students and other cO:T'J:luni ty grou?s at four existing conservation f~eld centres and a variety of outdoor and conservat~o~ education opportunities for the general public and school groups at the Kortright Centre for Conservatipn and at the Black Creek Pioneer Village. 1981-1984 OBJECTIVES: - a continuation of the programs at the same level of service as in 1980 for existing facilities - to provide for increasing public and group use of the Kortright Cer.tre for Conservation - to provide an outdoor and conservation educat~on program and experience for the following public ar.d groups by 1984: - Black Creek Pioneer Village 64,000 Cold Creek Conservation Field Centre 10,000 Special Days, Field Trips, Watershed & Claireville Dam Tours etc... 36,000 Kortright Centre for Conservation 125,000 Residential Conservation Field Centres 30,000 FU:I!DI1\G: Program revenues and the General Levy on all participating municipalities. A surplus or defic~t on the operations of the Boyd and Lake St. George Conservation Field Centres, will, by agreement, be charged or credited to the participating Boards of Education. An agreement, similar to Boyd, will be made w~th the participating and benefiting school boards for all future residential Conservation Field Centres. A minimum grant of $30,000 from the Provincial Ministry of Culture & Recreation and $10,000 from the Growth Endowment Fund is estimated for the operation of the Kortright Centre for Conservation. FINANCIAL CO~1ENTS: The estimates prov~de for revenues increasing in proportion to increasing expenditures. The cost to the member municipalities is relatively constant for the period 1981-1984 and substantially less than for 1980. MULTI-YEAR FORECAST 1981-1984 PROGR.?2.!: . Operations & Maintenance - Information & Education Operatio~s P.:"GE: ~ 1980 FIN A N C I N G 1979 Bud~ct Pre. Budget 1981 1932 1983 198~ i ;::x?Encitures .................................... 859,000 1,100,400 1,219.400 1,259,400 1',299,400 1,339,400 I Revenues ........................................ 757,700 989,235 1,113,235 1,158,235 1.203,235 1,248,235 : Net Expenditures .............................. 101,300 111,165 106,165 101,165 96,165 91,165 Grants ...............,.......................... 18,000 25,000 30,000 30,000 30.,000 30,000 Other ........................................... 10,000 7,000 10,000 10,000 10,000 I 10,000 i Levy........................................... . 73,300 79,165 ~6,165 61,165 56,165 . 51,165 i 101,300 111,165 106,165 101,165 96,165 91,165 . I EXPE~DITURES Albion Hills Conservation Field Centre 147,500 158,000 158,000 158,000 158,000 158,000 Boyd Conservation Field Centre 167,000 180,000 180,000 180,000 180,000 180,000 Claremont Conservation Field Centre 151,500 158,000 158,000 158,000 158,000 158,000 Cold Creek Conservation Field Centre 36,500 37,000 37,000 37,000 37.000 37,000 Lake St. George Conservation Field Centre - I 68,500 180,000 160,000 160,000 '160,000 160,000 - II - 68,000 160,000 160,000 160,000 160,000 General Interpretive Program 10,500 11,000 18,000 18,000 18,000 18,000 B.C.P.V. Pioneer Life 37,500 38,550 38,550 38,550 38,550 38,550 B.C.P.V. Tours 73,000 77 ,150 77 , 150 77 ,150 77 ,150 77 ,150 Kortright 167,000 192,700 232,700 272,700 312,700 352,700 859,000 1,100,400 1,219,400 1,259,400 1,299,400 1,339,400 1981-1984 MULTI-YEAR FORECAST PAGE: -IL. PROGPN1: Operations & Maintenance - Black Creek Pioneer Village PURPOSE: To provide a living portrayal of a crossroads village in 1867 Ontario for 300,000 visi~ors and students. 1981-1984 OBJECTIVES: - to continue the effective and efficient operation of the living heritage conservation project - to acco~modate the 300,000 visitors annu~11y and afford the opportunity to experic~c( life in a typical central Ontario crossroads Village of 1867 - to adequa~e1y maintain the heritage structures, landscaping, animals and collections - to staff the Dominion Carriage Works, the Taylor Cooperage, the Sawyer's House and the Richmond Hill Manse FUNDING: Hajor funding comes from gate receipts and sales outlets. It is anticipated that the Authority will match erants from the ?linistry of Culture and Recreation with levy funds. Additional funds are expected each year from the Foundation as the Black Creek Gro~vth Endowment Fund continues to expand. FINANCIAL COM}lE~TS: - the opening of the new buildings will involve six new staff at an average cost of $10,000 for wages and supplies; other areas of the operation expenditures will be generally unaffected - revenue from admission, growth endowment and sales outlets is expected to increase with natural growth and the addition of the new buildings MULTI-YEAR FORECAST 1981-1984 PROGRAN: Operations & Maintenance - Black Creek Pioneer Village PAG::: ~ 1980 i FIN A N C I N G 1979 Budf;et Pre. Budget 1981 1982 1'183 198.'. ! Expen-:i tures .................................... 889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,8001 Revenues ........................................ 750,000 888,900 949,800 949,800 949,800 949,8001 I Net Ex?enditures .............................. 139,000 144,000 144,000 144,000 144,000 I 144,000 Grants .......................................... 72 ,000 72 ,000 72 , 000 72 ,000 72 ,000 72,000, Octe::- ........................................... , - - - - - - I Levy........................................... . 67,000 72,000 72 ,000 72,000 72 ,000 72 ,000 I 144,000 j 139,000 144,000 144,000 144,000 144,000 I EXPENDITURES 1 I Administration 178,000 188,000 188,000 188,000 188,000 I 188,000 I Building Staff etc... 338,600 434,600 495,000 495,000 495,000 495,000 Food Facilities - 19,500 20,000 20,000 20,000 20,000 I Gate House 16,500 18,300 18,300 18,300 18,300 18,300 I Gift Shop 122,600 141,800 141,800 141,800 141,800 . 141 800 , I Livestock 55,500 59,000 59,000 59,000 59,000 59,000 Mai~tenance - Buildings 64,000 35,500 35,500 . 35,500 35,500 35,500 Maintenance - Grounds 49,300 39,100 39,100 39,100 39,100 39,100 Promotion & Publications 13,000 17 ,300 17,300 17,300 17,300 17,300 Registrar 21,500 36,800 36,800 36,800 36,800 36,800 Revenue Activities 11,600 23,700 23,700 23,700 23,700 23,700\ Security 18,400 19,300 19,300 19,300 19,300 19,300 I 889,000 1,032,900 1,093,800 1,093,800 1,093,800 1,093,800 MULTI-YEAR FORECAST 1981-1984 PROGRA."1: Operations & Maintenance - Black Creek Pioneer Village (Pg. 1}2) PAGE: -2l1... 1980 1979 Budget Pre. Budget 1981 1982 1983 1984 REVENUES I Admission Receipts 405,000 490,000 534,300 534,300 534,300 534,300 Endowment Interest 10,000 14,000 20,000 20,000 20,000 20,000 Food Services lfO , 000 45,000 45,000 45,000 45,000 45,000 Revenue Activities 18,000 28,500 28,500 28,500 28,500 28,500 Rentals & Miscellaneous 2,000 8,000 8,000 8,000 8,000 8,000 Sales Outlets 275,000 303,400 314,000 314,000 314,000 314,000 750,000 888,900 949,800 949,800 949,800 949,800 1981-1984 PiULTI-YEAR FORECAST PAGE: 2L- PROG~AM: Water & Related Land Management - 9peration & ~1aintenance of Water Control Structures (W5) PURPOSE: To maintain Flood Control works and structures as well as various erosion control works carried out under the Downstream Erosion Control Program. 1981-1984 OBJECTIVES: - continuation of the regular maintenance program at an equivalent level FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. MULTI-YEAR FORECAST 1981-1984 PROGRA.t: Water & Related Land Management - Operation & Maintenance of Water Control Structures (W5) PAGE: ~ 1980 I FIN A N C I N G 1979 Bud~et Pre, Budget 1981 1982 1933 198c. I I Expenditures .................................... 184,000 209,940 205,000 208,000 209,000 ' 213,000 ; Revenues .......,................................ - - - - - I - I : Net E:qenditures .............................. 184,000 209,940 205,000 208,000 209,000 I 213,000 Grants .......................................... 101,200 115,467 112,750 114,400 114,950 117, 150 I Other ........................................... - - - - - - I Levy........................................... . 82,800 94,473 92 , 250 93,600 94,050 95,8501 184,000 209,940 205,000 208,000 209,000 I 213,000 EXPENDITURES I Flood Warning System 18,000 24,000 24,000 25,000 26,000 27,000 C1airevil1e Dam 23,000 31,905 32,000 32,000 32,000 32,000 Milne Dam 4,000 5,000 5,000 5,000 5,000 5,000 G. Ross Lord Dam 23,000 24,730 25,000 25,000 25,000 25,000 Small Dams General 3,000 4,000 4,000 4,000 4,000 4,000 Flood Control Channels 75,000 65,305 70,000 70,000 70,000 70,000 Erosion Control 4,000 5,000 5,000 7,000 7,009 10,000 Major Maintenance 34,000 50,000 40,000 40,000 40,000 40,000 184,000 209,940 205,000 208,000 209,000 213,000 1981-1984 ~iULTI -YEAR FORECAST PAGE: ----2.L. PROGRAM: Water & Related Land Management - Community Relations Program (Support) (\HO) PURPOSE: To provide a supervisory and support service staff to implement a comprehensive information, community and staff relations and outdoor and conservation program. 1981-1984 OBJECTIVES: - to provide information, publications, tours and official openings of projects, photographic coverage, movie prints of existing films and exhibits relating to water and lanrl management aspects of the Authority program and to add clerical staff (9 months) to reserve space aL the Kortright Centre for Conservation. FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. MULTI-YEAR FORECAST 1981-1984 PROGRAH: . Water & Related Land Management - Community Relations (Support) (HIO) PAGE: ~ I 1980 FIN A N C I N G 1979 Budget, Pre, Eud~ct 19&1 1C"? 1933 1'384 >0_ Exp.::nditures ..................................... 239,000 278,120 286,120 2S6~1201 286,120 I 286,120 Rever:u~s ........................................ - - - - I - ~et: Expenditur.::s .............................. 239,000 278,120 286,120 286,120 286,120 286,120 I I Gra:1ts .......................................... 131,450 152,966 157,366 157,366 157,366 157,366; Ot:~er ........................................... - - - - 128~ 7541 - I Levy........................................... . 107,550 125,154 128,754 128,754 128,754 239,000 278,120 286,120 286,120 286,120 286,120 I CONSeRVATION INFORl~TION Staff Salaries 57,735 64,200 64,200 64,200 64,200 64,200 Staff Travel & Expenses 2,000 2,000 2,000 2,000 2,000 2,000 Publications & Printing 12,500 13,325 13,325 13,325 13,325 13,325 I Tours & Special Days 4,015 3,200 3,200 '3,200 3,200 \ 3,200 I Photographic Supplies 3,250 3,000 3,000 3,000 3,000 3,000 Motion Picture Program 4,000 3,000 3,000 3,000 3,000 3,000 Exhibits 1,000 20,000 20,000 20,000 20,000 20,000 Promotional Contingency 1,000 1,000 1,000 1,000 1,000 1,000 CONSERVATION EDUCATION Staff Salaries . 53,500 58,770 66,770 66,770 66,770 66, 770 Staff Travel & Expenses 1,000 1,000 1,000 1,000 1,000 1,000 Education Supervisors 99,000 108,625 108,625 108,625 108,625 108,625 239,000 278,120 286,120 286,120 286,120 286,120 1981-1984 MULTI-YEAR FORECAST . PAGE: ~ PROGRAM: Water & Related Land Management - Community Relations Program (Development) (iVlO) PURPOSE: To develop the facilities required to carry out the Policy of The Metropolitan Toronto and Region Conservation Authority respecting the planning, development and management of Outdoor and Conservat~on Education programs during the period 1981-1984. 1981-1984 OBJECTIVES: - the continuing development of trails, outdoor exhibits, indoor exhibits, the furnishings and equipping of the Kortright Centre for Conservation building - the planning and construction of residential facilities at Albion Hills and the Glassco Resldential Cam?us as part of the continuing program of the Authority to provide outdoor and conserva~ion education facilities in cooperation with the school boards of the region (not shown in multi-yeur forecast) FUNDING: - the construction of one replacement dormitory at Albion Hills ($200,000) is proposed to be funded on a 55/45 basis from the Ministry of Natural Resources and The Metropolitan Toronto and Region Conservation Foundation - the Kortright Centre for Conservation area development would be funded on a 55/45 basis by the Ministry of Natural Resouces and Municipal Levy - the Kortright Centre for Conservation exhibits, furnishings and equipment would be funded by The Metrcpolitan Toronto and Region Conse=vation Foundation - the conservation field centres, Albion Hills and Glassco Park would be funded and scheduled on a basis to be negotiated by the Authority and participating and benefiting school boards and is not shown in the Forecast at this time FINANCIAL COMMENTS: The financing of the further development of the outdoor and conservation education programs is based on: - - the Authority providing access to its lands at no charge to the region's school boards - the participating and benefiting school boards providing the cost of development of the residential Conservation Field Centres up to a matching amount MULTI-YEAR FORECAST 1981-1984 PROGP,"'I...:'! : Hater & Related L.:md :!.:magement - Comluunity Relations (Development) (\-110) PAG=:: -.16, 1930 I I I , i FIN A N C I N G 1979 Budget Pre. Budget 1981 1922 1033 1 r ~ , I I _'";J~ Expenditures .................................... 471~1941 459,000 376,000 176,000 126:000 I 126,0001 Revenues ........................................ - - - - I I I 126,000 I Net Expenditures .............................. L,. 71 , 194 459,000 376,000, 176,000 126,000 i Grants .......................................... 41,800 41,800 151,800 41,800 41,8GO I Itl SOO I , I Ocher ........................................... 395,194 383,000 190,000 100,000 50,000 50, 000 I Levy............,.............................. . 34,200 34,200 34,200 34,200 34,200 I' 34,200 I 471,194 459,000 376,000 176,000 126.0001 126,000! I EXPENDITURES I I I , I I IAlbion Hills Conservation Field Centre 7,000 - 200,000 - - - I Lake St. George - Stage II 171,722 100,000 - - - - I Kortright I a) Area Development 76,000 76,000 76,000 76,000 76,000 76,000 b) Exhibits, furnishings & equipment 216,472 283,000 100,000 100,000 50,000 50,000 471,194 459,000 376,000 176,000 126,000 126,000 I 1981-1984 MULTI-YEAR FORECAST PAG::: ~ PROGEAi'i: Water & Related Land Nanagerr.ent - Taxes and Insurance (W11) PURPOSE: To provide for costs associated with taxes on non-revenue pro cueing areas ~nd liabili~y insurance on Authority lands under {1acer and Relaced Ldnd ~anagemcn[ p~0g~ams. FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. F INP.NCIAL COillIENTS: For the years 1981 through 1984, we have added a 5% increase for addiciona1 properti~s only. No allowance has been made for inflation, or for any increase by virtue or ~ark~t value assessment. MULTI-YEAR FORECAST 1981-1984 P:Z-::'Ci{.'.:, : Water & Related Land Management - Taxes and Insurance (Wl1) PAGS: ~ 1980 ~ l I I ! F I ~ A ~ C I ~ G 1979 Eud~et 19S1 1%2 1C,83 , E2i', i 1 Pre. Budp2t 293,4001 I I I 279,500 I , E:':?<2nci tures .................................... 198,000 308~1001 323,500 i 339,6001 - J I Revenues ........................................ - - i - I - I I I Net E:qcnditt;:-es .............................. 198,000 279,500 I 293,4001 308,100" 323,5001 339,600; I I I 177,9251 i t Gr2nts ......................................................................... 108,900 153,725 161,370 169,Lf55 186.780! Other ........................................... I - - - - - - Levy........................................... . 89,100 125,775 132,030 138,645 145,575 .152,8~~. I 198,000 279,500 293,400, 308,100 323.500 j39,600! I I EXPENDITURES I I I Taxes, non-revenue 189,000 270,000 283,400 297,600 312,5001 328, leO i Insurance 9,000 9,500 10,000 10,500 11,0001 1l,500J 198,000 279,500 293,400 308,100 323,5001 339,600 I I I MULTI-YEAR FORECAST 1981-1984 PROGR.~'! : Water & Related Land Managemen~ - Interim Project Summary - Current and Capital P.:"GE: -29-L. , 1979 Blld?;8t 1930 I I 198? ~:1 I I F I ~ A N C I N G Pre. Budp,....t I 19~1. l ~?,.': I 3,692,800 I I Exp,;;,nditures .................................... 3,598,963 3,898,500 4,665,5001 5,200,500j 5,210,5001 Revenues ........................................ 42,000 102,800 I 98,500 65,0001 70,000 70.000: I I 5,1/.O,500! ~e~ Expenditures .............................. 3,556,963 3,590,000 3,800,000 4,600,500, 5,130,500 ! I I I ! Grants .......,.................................. 1,951,34) 1,974,500 2,090,000 2,530,275 :-c ,82,1,77 5 2,327,'27Sl Ocher ..................................................................................... - - - - - - i I Levy.....,..................................... . 1,605,618 1,615,500 1,710,000 2,070,225 2,308,725 2,313,2251 3,556,963 3,590,000 3,800,000 4,600,500 5,130,500 5,140,500 i : EXPENDITURES j W.C. Projects 92 , 500 117,350 117 , 350 132,500 132,500 ? I 13~,5001 Regulations 182,500 199,640 199,640 200,000 200,000 200,000 I Conservation Services 208,000 258,950 270,000 280,000 290,000 300,000 All Benefiting , 1,339,273 1,471,560 1,528,010 3,228,000 3,753,0001 3,753,000 Benefiting Municipalities 1,776,690 1,645,300 1,783,500 825,000 . 825,000 825,000 3,598,963 3,692,800 3,898,500 4,665,500 5,200,500 5,210,500 I - - 1981-1984 MULTI-YEAR FORECAST PAGE: ---3D....... PROGRu.i'l: Water & Related Land Management - Interim Project Current (~n) (~!3) (1.-17) (\013) PURPOSE: To provid~ the funding required for carrying out the objectives of the Interim Water and Related Land ~lanagement Project under current budget category and which apply to all municipalities benefiting as well as single benefiting mu~icipalities. 1981-1984 OBJECTIVES: _ to continue the program of the installation of a radio system in co-operation witr. the Ministry of Natural Resources for transmitting flood control and flood warni~g in~ormatio~ _ to continue to update and improve the flood warning systeo _ the administration and enforcement of water managenent regu1atio~s, and sub-division reviews, including salaries of enforcement officers and sub-division review staff, travel, legal and technical support costs _ to carry out resource management practices on Authority lands and to provide Conservation Assistance Programs for private landowners FUNDING: This is a share~ program, 55% of the funds being available from the Province of Ontario, and the balance being funded from the General Levy on all participating municipalities, MULTI-YEAR FORECAST 1981-1984 P~OG~~'!: Water & Related Land f~nagement - Interim Project Current - Water Control Projects (W2) 'D.\.....~ . 3h . ..v_. 11979 Budl?8t 1980 I I ! I FIN A ~ C I N G 1981 19S:,J } 9~~3 . " ---J Pre. Bud9:ec I - .. .)- E:.:pcr~ci::~rf:s ...................................................................... 92,500 117,350 I 117.350 I 132~5001 132~5001 13::: . 50C i Revenues ........................................ - - I - i - i ! 117.3501 I Net Expe:1citures .............................. 9L,500 117,350 132,500 132,500 132,500 I G:::::.r:ts ..,....................................... 50,875 64,543 64,5431 72,875 72.,875 7"1 Q.......... I . .. ." I) I I 0;: he:: ,........,..,.............................. 59 ~ 6251 I - - - - - LE:VY ............,............................... 41,625 52,807 52,807 59,625 59,625 92,500 117,350 117,350 132,500 132,500 132,500 EXPEiWITURES \ I I Staff Salaries 65,800 91,350 91,350 106,500 106.500 106,500 I Staff Travel 3,700 3,000 3,000 3,000 3.000 3,000 Flood Warning System - Radio 15,000 3,000 3,000 3,000 3,000 3,000 - Telemarks 8,000 20,000 20,000 20,000 20,000 2C.GO~ 92,500 117,350 117,350 132,500 1'32,500 . 132.500 I I . I , I i MULTI-YEAR FORECAST 1981-1984 PROGRAH: Water & Related Land ~lanagement - Interim Project Current - Water Management Regulations (W7) 'P'G- ~ ....-.. ~: I 1980 I I I FIN A N C I N G 1979 Budget Pre. Bu~l'-;ct 19::-;:' , 1982 1953 I I i" ~.'.. ! I ": no ~ 000 I I Expendi tures .................................... 182,500 199,640 199,640 200,000 I 20a,OOO: Reven~es ........................................ - - - - I - i ! Net Expenditures .............................. 182,500 199,640 199,6l~O 200,000 I 20.J,OOO! 2C:0 ,JGC ; I I ; I . , I I G::ants .......................................... 100,375 109 ~ 802 I 109,802 ' 110, GOO 110~OOO i 110,000 I Ocher ........................................... - - - 90 ~ 000 I Levy........................................... . 82,125 89,838 I 89,838 90,000 90 ,000 I' 182,500 199,640 I 199,640 200,000 200.000 ! 200,000 I I I . E:\PENDLTURES I i I I Staff Salaries 104,800 118,650 118.650 118,650 118,650 I 118,650 ! Staff Travel and Expenses l.,OOO 4,000 4,000 4,000 4,000 I 4,000 I Enforc~rncnt Offic~rs Salaries 48,900 54,290 54,290 54,290 54,290 j 54,290 ! Enforceffient Officers Vehicles 11,500 12,000 12,000 12,000 12 ,000 12,000 I Legal Fees 8,300 5,700 5,700 6,060 6,060 6,060 I I Technical Plans and Maps 5,000 5,000 5,000 5,000 5,000 5,000 I 182,500 199,640 199,6l.0 200,000 200,000 200,000 j I I I 1 I MULTI-YEAR FORECAST 1981-1984 PROGRA}! : Wacer & Rciaccd L~nd Manage~ent - Interim P=ojcct C~rrent - Cons. Scrv1c~s & Rive=bank Ero5io~ (W3 WS)PAGE: ~ 1980 I F r ~ A ~ C I N G 1979 Budget Pre. Bud~et 1981 1932 , 1983 19~~ , I Expenditures .... ........... ........................ ...... ...................... 208,000 258,950 270,000 280,000 290,00;) 3GO'O~ Revenues .. .... .............. ...................................... .... .................. 15,000 62,500 65,000 65;000 -:'0,000 70,000 Net Expendicu=es ................................... ........................ 193,000 196,450 205,OGO 215,000 220,000 230 aGDI I' i Grancs ............. .. .. .. . . ....................... ........ .... ..... ........... 106,15.0 108,047 112,750 118,250 121,000 126,500 ! Donacions .......... .. ... . ... ............ .......... ..... ................ ...... Lcvy ................ ............ ........ ......... ... .................. ........... 86,850 88,403 92,250 96,750 95,000 103,500 193,000 196,450 205,000 215,000 220,000 230,000 EXPENDITURES Staff Salaries 31,400 34,850 37,000 40,000 42,000 44,000 Staff Travel 2,000 2,600 3,000 3,000 4,000 4,000 Plant Propagation 5,000 40,000 41,000 43,000 45,000 47,000 Forestry Development 22,000 8,000 - - - Private Lands - Forestry 33,000 43,500 44,000 46,000 46,000 48,000 - Stream Improvement 28,000 27,000 35,000 40,000 40,000 40,000 - Land Use Planning 13,600 5,000 10,000 12,000 13,000 15,000 Authority Lands - Forestry 65,000 66,00.0 70,000 72,000 72,000 - 74,000 - Stream Improvement 20,000 10,000 10,000 10,000 12,000 12,000 - Land Management 10,000 8,000 12,000 14,000 16,000 16,000 208,000 258,950 270,000 280,000 290,000 300,000 I -- - 1981-1984 MULTI-YEAR FORECAST PAGE: ~ PROGRAr1: Wate~ & Related Land Management - Interim Project Capital PURPOSE: To provide the funding required ror carrying out the objectives of ~h~ Interim Water and Related Land Management Project under capital budget category and which apply to all munici- palities benefiting as well as sinBIe benefiting municipalities. 1981-1984 OBJECTIVES: - to continue Hyoro1ogic and Environmental Studies _ to carry Ollt: pr(!limimlry ~..nd final ~l:,.ince,:in~~ .-,i p;-ojcccs prop.:HlIi:d ur.der lkW flood cc.':n:rol plan co~mencing 1982 _ to carry out land acquisit~on component of the Flood Control Plan , _ to carry out erosion control and flood control structures in accordance with the proposals and the revised Flood Control Plan _ continuation of the downstream erosion control in the regions of Metropolitan Toronto, Peel, York and Durham _ the completion of the Stouffville Channel on the Duffin Creek and the completion of works on che Wilket Creek and channel maintenance on Centreville Creek at Caledon East _ construction of Flood Control Channel en the East number - Oak Ridges, Tow~ of Richmond Hill _ acquisition of specific hazard ,lands etc. deemed to be benefiting to a particular municipal- ity FUNDING: This is a shared program, 55% or the funds being available from the Province of Ontario and the balance being funded from the Capital Levy on all participating municipalities. - <, ~.) MULTI-YEAR FORECAST 1981-1984 PROC?-,:..l.! : Wate~ & RG1ated Lar.d ttanagc~ent - I~cerirn Project C~pita1 - A~l Ben~fi~ing p'r.r. -.2~ - .-"v_ . 1980 I I i I F I ~ A ~ C I N G 1979 Bud~et ,Pre. Budget 19S1 I 198~ 1 ~'S3 :.02~ ! : I I E:--:.pe:lci;:ures ........................................................................ 1,339,273 1,471,560 I l,52S,OlClI 3,228,000 3 , 753 ,000 i 3,753,OCO! I I RevenL:es ..........................,.............. - - - ! - I - I - ! I i ~e:: EX"Jenditu~es .............................. 1,339,273 1,471,560 i 1,528,010 I 3,228,000 3,753,000 I 3,753,000! I . I I I I : I G~ants .................................:........ 736,600 809,358 840,405 1,775, L,OO 2 ,06~ ,ISO i 2,064,150 I OL:~er ........................................... - - , - - - I - , I I Levy........................................... . 602,673 662,202 687,605 1.452,60C 1,688,850 ! 1,638,350 i I 3,753,000 I 1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 i EXPENDITURES I I P1a<1 Review 397.000 236.000 I - - - - I Environracnta1 Honitoring 100,000 172,000 - - - - I Flood Plain Acquisition 682,273 848,560 1,098,010 1,500,000 1,500,000 1,500,000 i I Headwaters Acquisition 160,000 200,000 200,000 200,000 200,000 200,000 Mappin~ - 10,000 - - - - Public Relations - 5,000 5,000 5.000 5,000 5,000 Studies, Environ~cnta1 Assessment & Mapping - - 225,000 225,000 250,000 250,000 Erosion, Flood Control Structures (General) - - - ,1,000,000 1,500,000 1,500,000 Sediment Control & Prevention - - - 298,000 298,000 298,000 1,339,273 1,471,560 1,528,010 3,228,000 3,753,000 3,753,000 f1UL TI -YEAR FO[{ECAST 1981-1984 ?RCG?__~'~; Water & Re1ate~ Land Macagement - Interim Project Capital - Benefitin~ !~nicip31ities ?_':"'CE: -2h 1900 -I I , I F I X A N C I N G 1979 Budget Pre. Eudf~et 1981 1982 1903 I L 9~!; , , 1,783,500 I 825,000 I I ~ ,- " 1,776,690 1,645,300 825,000 ! 825,000 i :.:{rJE::1C~tJr2S .... a . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I I I Rc.....e:1ues ........................................ 27,000 ! 40,300 33,500 ! - 1 - - I I R?C. 000 i Net Ex?ecditur-es ,............................. 1,749,690 1,605,000 1,750,000 8')~ ono I 825,000 I -), .J 1 L --', I , I , G::-an::-s .....,.,.................................. 957,345 882,750 962,500 453,750 453.750 ; 45::,;50 . 0[; he r- ............................................ : I - - - - - j - I Levy........................................... . 792,345 722,250 I 787,500 371,250 "71 r~ I 371 ') <'0 i J ,)U I . ......, LJ , 1,750,000 I 825,000 i i 825,000 I 1,749,690 1,605,000 825,000 i .' . I I ., . .1 EXPENDITURES ! Erosion Control 500,000 I Mecro 825,000 825,000 875,000 500,000 500,000 Peel 101,000 105,500 105,500 70,000 70,000 70,000 York 75,500 83,300 26,500 35,000 I 35,000 35,000 I Durham 25,500 26,500 26,500 20,000 20,000 ~O,OOO I Highland Creek (11) 240,000 - - - - - I Stouffville (Y) 395,000 305.., QOO - - - - I Wi1ket Creek (M) 10,000 250,000 - - - - I Oak Ridges (Y) 5,000 50..000 500,000 - - - Flood Control Channels - - 250,000 - - - I WC-58 - Don River 99,690 - - - - - Hethane Gas Study - - - - - - Acquisition of Benefiting Municipality Lands - - - 200,000 200,000 200,000 1,776,690 1,645,300 1,783,500 825,000 825,000 825,000 1981-1984 MULTI-YEAR FORECAST PAGE: . ~ PROGRAr'i: Water & Related Land Management - Supp1cffientary Projccc - Keating Ch~nne1 PUlli'OSE: To provide fu~ding for the protcction of th~ lower Den River Area from flooding. 1981-198~ OBJECTIVES: To provide funding for the dr~dging of the Keating Channel on an ongoing basis. FU:iDING: This is a sh&red Progrmn, 55% of ~he funds being av~il~blc from the Province or Ontario and the balance being funded from the Hunicipality of Hetropo1itan Toronto, it being the designated Benefiting Municipality. MULTI-YEAR FORECAST 1981-1984 PRCG:::..AH ~ Water & Related Land Management - Supplereentary Project - Keating Channel P.:..G::: : 33. I I 1930 I . . FIN A N C I ~ G 1979 Bud~et Pre, nueget 1981 1982 1<)83 10S~ , :,:,,:pG::-.ditu:-es ....................................... I I 133.000 200,000 200,000 I [,33.000 I - 100,000 I Rev(:!1ues ......................................... I I - - I - ! - - I - I I i 100,000 -, 133.0001 I I l\et: ;::":?c~citures ................................ - 2GO,OOJ I 200, JCO ; 4'" 3 C,]Cl I I [ .J , \. I I ~'3 l' 0 I Gr~nts .......................................... - 55,000 73,150 no,ooo I llq,OOO I Oche:- ..,........................................ - - - - - I ~J ~ ) I Levy............................................ . - 45,000 59,850 90,000 90,000 1- 194.8:'0 i 100,000 133.000 200,000 I 200,000 I ' I - 433.0uO I I I ! I I ! J::xPI::;m i'~'uRES ! Kcatin~ Chaancl DrcJ~ing I I - 100,000 133,000 200,000 200,000 433,000 I I . I I I I I I I I I I 1981-1984 MULTI-YEAR FORECAST PAGE: ~L PROGMr'l: Conservation & Recrcation Land Management - Conservation Arcas (Support) (Cl) PURPOSE: To administer and develop Authority owned conservation lands in keeping with the Interim Conserva~ion and Recreation Land Management Plan (1979) . To provide a comprehe~sive program of management and prov1s10n of outdoor recreation opportunities through facility improvements and master planning of conservation areas. 1981-1984 OBJECTIVES: To finalize the Conservation and ,Recreation Land Management component of the Watershed Plan. To develop and schedule the Master Plans of Conservation Areas. To administer existing programs and activities. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL CO~~ENTS: These estimates reflect the requirement for additional clerical staff and an increase on fish and wildlife habitat improvements. MULTI-YEAR FORECAST 1981-1984 'P~CG~;l.! : Conservation & Recreation Land Management - Conservation Areas (Support) (C1) PAGE: 40. 1980 l FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 ' (l ~ ,', I .L~U"'" . I -, ='::~?2:ldi::~res ~...................................................................... 143,500 170,750 170,750 170,750 170,750 I 170,750 ! Revenues ......,................................. - - - - - I - I :-;et Expenditures .............................. 143,500 170,750 170,750 170,750 170,750 170,750 i ! Gr a r. t s ... '. _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71,750 85,375 85,375 85,375 85,375 85,375 i I I 'Other .,....... _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - I - I I Levy........................................... . 71,750 85,375 85,375 85,375 85,375 85,375 143,500 170,750 170,750 170,750 170,750 170,750 EXPENDITURES I Staff Salaries 127,260 150,000 150,000 150,000 150,000 150,000 I Staff Travel & Expenses 3,240 3,600 3,600 3,600 3,600 3,600 Vehicles 6,500 7,150 7,150 7,150 7,150 7,150 I Pond Service 6,500 - - - - - I Fish & Wildlife Habitat - 10,000 10,000 10,000 10,000 10,000 143,500 170,750 170,7~0 170,750 170,750 170,750 1981-1984 MULTI-YEAR FORECAST PAGE: ~ PROGRAM: Conservation and Recreation Land Management - Conservation Areas (Development) (Cl) PURPOSE: To develop facilities on Authority owned conservation lands in accordance with the Recreation component of the Conservation and Recreation Land Managem~nt Plan. This plan reco.nrnends a comprehensive program of conservation and the provision of outdoor recreation opportunities. 1981-1984 OBJECTIVES: To develop the Claireville Beach area including a refreshment/change room facility and ground developments. To develop an additional picnic area to accomodate approximately 1000 additional visitors and required road adjustments at Claireville Area. To complete the Indian Line Campground extension including a washroom/shower building and landscaping of sites. To provide funds for small development items and the initiation of the expansion of the Boyd Area, and facility developments in Albion Hills, Cold Creek and Heart Lake Areas. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL COMMENTS: Provincial and municipal funding limitations on this program have necessitated the concentration of development. -- MULTI-YEAR FORECAST 1981-1984 PROGRAl-l: Conservation & Recreation Land Management - Conservation Areas (Development) (C1) PAGE: 112....- 1980 FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984 Expendi tures .................................... 126,500 126,500 154,000 200,000 200,000 200,000 Revenues .......................... '. . . . . . . . . . . . . . - - - - - - ::ct Expenditures .............................. 126,500 126,500 154,000 200,000 200,000 200.000 I Grants .......................................... 63,250 63,250 77 ,000 100,000 100,000 100,000 I Other ...................."....................... - - - - - - Levy........................................... . 63,250 63,250 77 ,000 100,000 100,000 100,000 I 126,500 126,500 154,000 200,000 200,000 200,000 EXPENDITURES I Albion Hills 40,400 - - - - 40,000 I Black Creek 1,000 1,500 - - - Boyd - - - - - 96,000 Bruce's Hill 8,600 25,000 - - - - C1airevil1c 3,300 79,000 130,000 185,000 185,000 - Claremont - - - - - - Cold Creek 38,000 4,000 - - - 10,000 Glen Haffy 8,500 9,000 9,000 9,000 9,000 9,000 Greenwood 3,200 - - - - - Heart Lake 5,500 " - 10,000 - - 40,000 Oak Ridges - - - - - - Petticoat Creek 8,000 - - - - - Glen Major - - - - - - Lake St. George - - - - - - Studies etc... 10,000 5,000 - - - - General Deve1opm~nt - 3,000 5,000 6,000 6,000 5: 000 \ Milne - - - - - 126,500 J.26,500 154,000 200,000 200,000 200,000 1981-1984 MULTI-YEAR FORECAST PAGE: 42A ............... PROGR4M: Conservation & Recreation Land Management - Conservation Areas (Development) (Cl) PURPOSE: To complete the rehabilitation of the South Thackeray Landfill Site. 1981-1984 OBJECTIVES: _ to install various plant materials consisting of reforestation stock, deciduous trees and woody plant materials from the Authority nursery _ to complete rehabilitation of the Thackeray Landfill Site for minor recreation and wildlife habitat , FUNDING: The Corporation of the Municipality of Metropolitan Toronto will be providing total funds nece- ssary for this project. FINANCIAL COMMENTS: There will be no effect on the Municipal Levy or Provincial funding for this program. MULTI-YEAR FORECAST 1981-1984 PROGRA~.l : Conservation & Recreation Land Management - Conservation Areas ( Deve lopmen t) (Cl) PAC:::: 42B - 1980 I FIN A ~ C I N G 1979 Budget Pre. Budget 1931 1982 1983 1984 =:xpc.ndi cures .... .................... .................... ............................ 66,000 I 23,000 40,000 40,000 17,000 - ! !(.:;ve:1ues ........................................ 66,000 23,000 40,000 40,000 17,000 - I Net Expenditures ...... ...................................................... - - - - - - i Grants .................... .................................................... ............ - - - - - I - I Other ..,........................................ - - 1 - - - - I Levy........................................... . - - - - - - - - - - - - \ I EXPENDITURES I Thackeray Landfill Site - Revegetation 40,000 17,000 18,000 20,000 40,000 - Strategic Planning for Ontario Fisheries 48,000 3,000 - - - - 66,000 23,000 40,000 40,000 17,000 - I 1981-1984 MULTI-YEAR FORECAST PAGE: JlL PROGRAr1: Conservation & Recreation Land 11anagement - Conservation & Niagara Escarpment Land (C2) PURPOSE: To acquire Conservation Area and Niagara Escarpment lands as set out in the Authority's plan for ancillary conservation measures and Niagara Escarpment land acquisition, The purpose of such acquisitions is to bring into public ownership environmentally important lands such as source areas, headwater zone river valleys and Oak Ridges inter10bate moraine lands. FUNDING: This is a shared program, a 50% grant on Niagara Escarpment Land and Conservation lands is available from the Province of Ontario, the balance being funded from the General Levy on all participating municipalities or funds which may be made available through The Metropolitan Toronto and Region Conservation Foundation or through funds raised through Authority revenues. MULTI-YEAR FORECAST 1931-1984 PROGRAH: Conservation & Recreation Land Management - Conservation & Niagara Escarpment Land (C2) PAGE: ~ 1980 I 1 F I ~ A N C I N G 1979 B'..ldget Pre. Budget 1981 1982 1983 1 CQ, ..l.. .-........- I - c' 48,800 ! I ::':-:pE::1 ~tures ...,................................ - - - - - i Revenues ..,..................................... - - - - - - , N2t Ex?enditures 48.800 - - - - ~ ..... ....... ....... ............ ..... Gro.nts .............................................................. .. - - - - - Other ........................................... 48.800 - - - - - Levy........................................... . - - - - - - 48,800 - - - - - I EXPENDITURES Niagara Escarpment Land - - - - - - Conservation Area Land 48,800 - - - - - 48,800 - - - - - I 1981-1984 MULTI-YEAR FORECAST PAGE: ~ P'ROGRAM: Conservation & Recreation Land Management - Cons. Area Information & Interpretive Program {C3) PURPOSE: To provide information and special programs related to recreation and land management in the Authority's conservation areas. 1981-1984 OBJECTIVES: To continue the program as in 1980. FUNDING: This is a shared program, 50~ of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FINANCIAL CO~L~ENTS: Limited funding from the Province of Ontario and member municipalities requires some .programs to be funded from operations and maintenance. MULTI-YEAR FORECAST 1981-1984 PROGRAH: Conservation & Recreation Land Management - Cons. Area Information & Interpr~tive Program (C3) PAGS: ~ 1980 i FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 198L,. I E:-:pendit'clres .................................... 21,000 22,680 22,680 22,680 22,680 22,680 I Revenues ..,..................................... - - - - - - 1\ec Ex?enditures ,............................. 21,000 22,680 22,680 I 22,680 22,680 ! 22,680 I I Gr-2.nts .......................................... 10,500 11,340 11 , 340 11 ,340 11,340 11,340 I Ocher ........................................... - - - - - - I I L12vy .......,.................................... 10,500 11 , 340 11,340 11 , 340 11 , 340 11,340 ! I ' 21 ,000 22,680 22,680 22,680 22 ,680 22,680 EXPENDITURES Staff Salaries 11,100 12,320 12,320 12,320 12,320 12,320 Publications & Printing 3,000 4,500 4,500 4,500 4,500 4,500 Tours & Special Days 2,000 2,300 2,300 2,300 2,300 2,300 Photographic Supplies 2,900 2,560 2,560 2,560 2,560 2,560 Motion Picture P~ogram 2,000 1,000 1,000 1,000 1,000 1,000 21,000 22,680 22,680 22,680 22,680 22,680 \ 1981-19WI ~ULTI-YE^R FORECAST p,\G( : -1fL.. PROGRAr-l: Conservation & Recreation Land Management - Rent and Utility Services (C5) PURPOSE: Provision of administration of the Central Services and stores. 1981-1984 OBJECTIVES: - the provision of stock supplies, including purchasing and distribution _ the provision of building and mechanical trades service to all Divisions of the Authority as required FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the'General Levy on all participating municipalities. MULTI-YEAR FORECAST 1981-1984 P ROGRA:'1: Conservation & Recreation Land Management - Rent & Utility Services (C5) PACE: ~ 1980 I I FIN A N C I N G 1979 Bud~et Pre. Budget 1981 198? 1983 1984 I , Expenditures .................................... 39,000 43,280 43,280 43,280 43,280 43,28Q I Revenues ........................................ - - - - - - Net Expenditures ...............;.............. 39,000 43,280 43,280 43,280 43,280 43,280 Grants .......................................... 19,500 21,640 21,640 21,640 21,640 21,640 Och.::r ........................................... - - - - - 21 ~ 640 I Levy........................................... . 19,500 2l,640 21,640 2l,640 21 ,640 39,000 43,280 43,280 43,280 43,280 I 43,280 EXPENDITURES Staff Salaries 35,930 39,880 39,880 39,880 39,880 39,880 Vehicles 3,070 3,400 3,400 3,400 3,400 3,400 39,000 43,280 43,280 43,280 43,280 43,280 1981-1934 MULTI-YEAR FORECAST PAGE: -4!L PROGPAN: Conservation & Recreation Land Management - Taxes and Insurance (C6) PURPOSE: To provide for costs associated with taxes on non-revenue producing areas and liability insurance on Authority lands and facilities under Conservation & Recreation Land Management Progr.ams . FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. FIN~~CIAL CO~~NTS: For 1981 through 1984 we have added 5% for additional properties only. No allowance has been made for inflation, or for any increase by virtue of market value assessment. MULTI-YEAR FORECAST 1981-1984 P?.OGi{.,\~.! : CO:1servacion & Recreation Land l1anagement - Taxes and Insur~!l1ce (C6) PAGE: ~ 1980 l FIN A N C I N G 1979 Budget Pre. Budget 1981 1982 1983 1984 Expenditures .................................... 70,000 78,000 81,600 85,600 89,800 94.200 I Revenues ........................................ I - - - - - - i ~let: Exr>encicures .............................. 70,000 78,000 81,600 85,600 89.800 I 94,200 i I Gra:1ts .......................................... 35,000 39,000 40,800 42,800 44,900 47,100 \ I lo<::-:e:: .... - - - - - - \ I ... .. ... ................ ............... \ Levy ............................................ 35,000 39,000 40,800 42,800 44.900 I 47.100 : I , , 70,000 78,000 81,600 85,600 89,800 94> 200 i EXPENDITURES Taxes. -non-revenue 60,000 67,500 70,600 74,100 77 .800 81,700 Insurance lO,OOO 10,500 11,000 11,500 l2,000 12,500 i 70,000 78,000 8l,600 85,600 89,800 94,200 1981-1984 r.ULTI-YEAR FORECAST PAGE: -5L- PROGPA:'\: Water & Related Land Management - Waterfront Programs (\v9 ) PURPOSE: To provide administrative, planning and engineering staff necessary for implementing the Waterfront Project. FUNDING: This is a shared program, 50% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all parcicipating municipalities. FINANCIAL CO!-U-IENTS: Although no increase in staffing is shown in the forecast, the responsibility for development of Aquatic Park may require an increase in staff. MULTI-YEAR FORECAST 1981-1984 PROGRAN: Water & Related Land Management - Waterfront Programs (W9) P .;GE : -52..- 11979 Budget 1980 FIN A N C I N G Pre. Budget 1981 1982 1983 lS84 Sx?end:.tures .................................... 66,000 71,750 71,750 71,750 71 , 750 71,7501 Revenues ........................................ - - - - - - I Net Expenditures .............................. 66,000 71,750 71,750 71,750 71 , 750 71,750 G::ants .......................................... 33,000 35,875 35,875 I 35,875 35,875 35.8751 Ochl::: . ... ............................................... .............................. - - - - - - I Levy........................................... . 33,000 35.875 35,875 35,875 }5,875 35,875 66,000 71,750 71,750 71,750 71,750 71,750 EXPENDITURES I I Staff Salaries I 62,000 67,750 67,750 67,750 67,750 67,570 i Travel & Expenses 4,000 4,000 4,000 4,000 4,000 4,000 I 66,000 71,750 71,750 71,750 71,750 71,750 1981-1984 MULTI-YEAR FORECAST PAGE: ~ PROGRAr-l: Special Projects _ Waterfront Plan PURPOSE: The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline within the arca of the Authority's jurisdiction, a handsome waterfront balanced in its land uses which will complement adjacent .1.reas, taking cor>,niz:mc(' of existinr; residcntial development and makil,r: available, wherever possible, features which warrant public use. 1981-1984 OBJECTIVES: - the start of developmcnc incl~ding landfilling at Colonel Sam Smith Park - the corr:pletion of the boat harbour at Humber Eay \Jest. Phase II - the completion of Hun:her Hay E:1s!: U.lterfront Arc.1. _ the initiation of the Western Beaches Development _ the completion of the boat harbour at Bluffer's Phase II - the first phase of development of the Bluffer's Toplands _ the initiation of development of East Point Park _ the continuation of land acquisition to complete the link from Petticoat Creek to Frenchman's Bay _ the continuation of the shoreline management program _ the continuation of the Environmental Monitoring and Assessment Programs _ the initiation of development of Aquatic Park subject to necessary approvals FUNDING: This is a shared program, a grant of 50% of costs is available from the Province of Ontario, the balance being funded by the Waterfront Capital Levy on all participating municipalitics. The Government of Canada is constructing shore protection at the Small Craft Harbour at Bluffer's Park and a similar application has been made for Humber Bay West, Phase II. ~INANCIAL COMMENTS: 1981 is the last year of the second five-year Project for Waterfront Development and it has been assumed that the Waterfront Development Program would be continued for a third five-year term at a similar level of funding. The development of Aquatic Park will require the allocation of additional funds by the Province of Ontario. The total budget allocations in 1980 and 1981 include the Supplementary Waterfront Project. MULTI-YEAR FORECAST 1981-1984 PROG;t.~'! : Special Projects - Waterfront Plan ~A;GE: -2L.. 1980 I I F I ~ A N C I N G 1979 Bud;?ct Pre. Budp.,et 1981 1982 1983 1 ():> I I _~J"" I ;:'''''e:1..li t"~e 2,800,000 3,130,250 3,130,250 3 ,600,000 I 3,600,000 I 3,600,080 I -.'.f-' . ~- ...~ s .................................... ! Revent;es ........................................ - - - - - : - i Ne:: Expenditures ............................... 2.800,000 3,130.250 3.130,250 3,600,000 3.600,000 I 3 600 oeo I , , I I I I G~a"r" l,400,000 1.565,125 1,565,125 1,800,000 1, 800 ~ 000 I 1,800,000 I J.. ........~ .................................................................................. i Ger.,":- ........................................... I - - - - - i i LE.vy ............................................ 1,400,000 l,565,125 1.565,125 l,800,OOO 1,800,000 I 1,800, COO J I i 2,800,000 3,130,250 3,130.250 3,600,000 3.600,000 I 3,600,000 I \ EXPENDITURES J I I I Sam Smith 50.000 50,000 50,000 - 800,000 600,000 I Humber B.JY ~Jest l60,OOO 950,250 960,250 350,000 - - I Humber Bay East 950,000 400,000 lOO,OOO - - 200~0001 Hestern Beaches 5,000 - - 200,000 200,000 Afju,:tic Park - 50,000 lOO,OOO 500,000 500,000 620,000 I I Ashbridge' s Bay 5.000 40,000 10,000 - - I Bluffer's Toplands - - - - 250 ~ 000 I 250,000 Bluffer's I & II 740,000 660,000 930,000 l,OOO,OOO - EA.st Point 20,000 - - 220,000 320,000 400,OOCl Ajax Haterfront - - - - - 200,000 Guild Inn - - - - 200,000 - Shoreline Management 450,000 600,000 650,000 l,OOO,OOO I,OOO,OOO l,OOO,OOO Salaries 50,000 80,000 80,000 80,000 80.000 80,000 Environmental Studies & Monitoring 60,000 lOO,OOO 100,000 100,000 100,000 100,000 Land Acquistion 240,000 150,000 l50,OOO 150,OOO l50,OOO l50,000 Maintena:lce 50,000 50,000 - - - - Petticoat Creek 20,000 - - - - - 2,800,000 3,130,250 3,130,250 3,600,000 3,600,000 3,600,000 I 1981-1984 ~ULTI-YEAR FORECAST PAGE: -5L PROGR#i: Historic Sites Development PURPOSE: To carry out restoration and development work at Black Creek Pioneer Village in accordance with Authority approved plans. 1981-l984 OBJECTIVES: _ to complete the restoration of the Richmond Hill Manse _ to coreplete Phase I of the Black Creek Visitor's Cencre FUNDING: All funding comes from The Metropolitan Toronto and Region Conservation Foundation, Wintario and donations. FINANCIAL CO~~1ENTS: Financing of these projects depends upon funding being available from The Metropolitan Toront0 and Region Conservation Foundation and other sources. MULTI-YEAR FORECAST 1981-1984 ?:,,'"lr,r:J ~ '.'. Historic Sitl~ D~velupm~nt P :\(;E : .-5b.~ _ .\.vu.\.."\...... I I 1S30 \ , I i FIN A N C I N G 1979 BuJget I Pre. Budget 1981 1932 1983 ~ "8 '. r ",.. -.., --'" -......-.s 60,000 46,000 750,000 - - - I , ....~~t............. _~ __t.: ., ......... ..... ........................ ...... .".. ...... I \....evn..,t:'s . - , !\. t,;;..;"; ............................................................................. - - - - - I ---1 I :\::: t L.:? C1 d i t: u:: c s .............................. 60,000 46,000 750,000 I - - I - I I \ G::2..:ts .......................................... I -, I - - - - - - ! I , I Ocher .... 60,000 46,000 750,000 - - I - I I LeVy.....::::::::::::::::.::::::::::::::::::::::: - - - - - I - I I ! I 60,000 46.000 750,000 I I I - - i - ! \ I I EXPENDTTURES I I Roblin's Mill - - - - - - \ Boardwalk - - - - - - Bruce's Mill - - - - - - Carriage \.Jorks - - - - - - Doctor's House - - - - - - I Hennonite Heeting Hall - - - - - - Taylor Cooperage 30,000 ! - - - - - I Sa\....yer's House 12 ,000 - - - - - Richmond Hill Manse 18,OOO 46,000 - - - - B.C.P.V. Visitors Centre - - 750,000 - - - Collection - - - - - - 60,000 46,000 750,000 - - - B-32 SCHEDULE "0 PROPOSED SCHEDULE OF FEES FOR 1980 ," - -- - Schedule 1. In this Schedule "season" means the summer season which commences on the 1st day of April and ends on the 31st day of October in any year or the winter season which commences on the 1st day of November and ends on the 31st day of March of the next following year. 2. The following fees shall be paid to the Authority for permits issued by the Authority and for the occupation and use of the lands and works, vehicles, boats, recreational facilities and services of the Authority: (1) For parking in all conservation areas, except Black Creek, Pal grave and Woodbridge and except Claremont during the winter season, (a) for one vehicle carrying less than ten passengers, per day .......................................... $ 2. SO (b) for an annual parking permit for one vehicle carrying less than ten passengers, per year ...... 30.00 (c) for one vehicle carrying ten or more passengers, per day .......................................... 15.00 (2) For a permit at Glen Haffy Extension, (a) for the use of each fishing pond, including ve- hicle parking for not more than twenty vehicles, per day .......................................... ;;0.00 (b) for parking, for each vehicle in addition to the twenty vehicles for which a fee is paid under clause (a) ....................................... 2.50 (c) for the use of row boats, including life iackets and oars, when used in conjunction with a permit issued under clause (a), plus Provincial Sales Tax, per pond, per day.. ...... ...... .... ......... 20.00 (d) for the use of the cabin, when used in conjunction with a permit issued under clause (a), per day... 25.00 3. (1) For entrance to the Black Creek Pioneer Village from the day the buildings open in March to the day the buildings close in January, per day, (a) for each person over fifteen years of age who is not a student ................................. 3. SO (b) for each person fifteen years of age or under or each student with a student card ... ........... 1.00 (c) for a family, consisting of one or two adults and their children who are fifteen years of age or under or who are students with a student card, maxlmum .......................................... 7 .00 (d) for each person who is sixty-five years of age or over .......................................... 1 . SO (e) for each person over fifteen years of age who is part of a group of twenty-five persons or more ent ering as a group .............................. 3.00 ;-329 - 2 - (2) For an annual permit expiring on the 31st day of December of the year in which the permit is issued, for entrance to the Black Creek Pioneer Village, (a) for a family, consisting of one or two adults and their children who are fifteen years of age or under or who are students with a student card............................................ . $ 25.00 (b) for an individual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15.00 (3) For entrance to the Black Creek Pioneer Village from the day after the buildings close in January to the day before the buildings open in March, per day, (a) for each person over fifteen years of age ........ .50 (b) for each person fifteen years of age or under .... .25 (c) for a family consisting of one or two adults and their children who are fifteen years of age or under or who are students with a student card, maXlmum .......................................... 1.50 4. For the use of the Heart Lake Recreation Building, the Albfon Hills Chalet or the Bruce's Mill Beach Centre, with a min- imum fee of $30.00 plus parking fees, per hour ..........,.. 15.00 5. (1) For the use of the Cold Creek Conservation Field Centre meeting room with a minimum rental fee of $20.00 plus parking fees, per hour ......................"........ 10,00 (2) For the use of kitchen facilities in conjunction with the use of the meeting room for which a fee is paid under subi tern 1, per hour ............................. 5.00 6. (1) For the rental of a row-boat including life jackets and oars, in a conservation area except Glen Haffy Extension, plus Provincial Sales Tax, per hour ........ 3.00 (2) For the rental of a canoe, including life jackets and paddles, plus Provincial Sales Tax, (a) per hour ......................................... 3.50 (b) per day .......................................... 15.00 ( 3) For canoeing instructions for a group of at least five people, with a reservation, including the use of a canoe, life jackets and paddles, per group member, (a) per half-day ...................................,. 3,50 (b) per day .......................................... 6.00 (4) For canoeing instruction courses for individuals in- cluding the use of a canoe, life jackets and paddles , (a) per course per person .......................,.... 35.00 (5) For group canoeing instruction, other than a group with a reservation, for a one hour lesson, per person ...... 2.75 - 3 - B-330 7. For a horse-drawn sleigh ride at the Black Creek Pioneer Village, (a) for each person on an individual basis, during open hours, per ride ....................................... $ .35 (b) for a reserved group during open hours, per half hour.. 15.00 (c) for a reserved group, from 7:15 p.m. to 8:l5 p.m. .... . 75.00 8. For a permit authorizing a corn roast or similar activity after sunset, not including parking, in any conservation area except Black Creek ..................................................... 25.00 9. (1) For a permit to occupy a specially designated group over- night camp-site, including parking for up to seven nights, (a) for a group of not more than twenty persons, per night . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.00 (b) for each person, in addition to the twenty persons for whom a fee is paid under clause (a), per night ... . .35 (2) For a permit to occupy a group day camp-site, including parking, per person, per day ............................... .35 10. For a permit to occupy a individual camp-site, (a) at Albion Hills and Cold Creek Conservation Areas, per night ...... ... .. ............. ... .................. 5.00 (b) at the Indian Line Tourist Campground, per night . . . . . . 7.00 11. For electric power at an individual camp-site, where available, per night . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.00 12. For firewood at a conservation area named in item 10, per bundle .......................................................... 1.00 13. For showers at Albion Hills and Indian Line Tourist Campground, for a controlled time period .................................... .25 14. For launching a boat, not including vehicle parking, per day.... 1.00 15. For a permit for use of a conservation area for horseback riding, not including vehicle parking, (a) per day, per horse ..................................., 1.00 (b) per year, per horse ................................... 20.00 16. For a permit for the operation of an all terrain vehicle, not including vehicle parking, (a) for a daily use permit................................ 1.00 17. Except at the Black Creek Pioneer Village, for a permit for a group picnic, not including vehicle parking, (a) for a group of not more than 100 persons . . . . . . . . . . . . . . 10.00 (b) for each fifty persons or fewer persons in addition to the 100 persons for whom a fee is paid under clause (a) .......... .................................. 5,00 ;- 3 3 1 - 4 - (c) for the use of a shelter, when available, in addition to any other fees paid under this item, per day ............................................. $ 25.00 (d) for a fire in a ground fire pit designated for that purpose, in addition to any other fee paid under this item, per day .................................. 10.00 18. For use of the Petticoat Creek Swimming Area, (a) per person, per day ................................. .50 (b) for a book of ten tickets " " " " " " " " " " " " " " " " " " " " " " " " " " " 4.00 19. For the rental of buildings and equipment at Black Creek Pioneer Village, (a) for the use of anyone location for a wedding (including rehearsal) """"""""""""""""""""""""" """""" 175.00 (b) for the use of a horse and vehicle for a wedding ..., 80.00 (c) for the use of the Half-Way House Dining Room ....... 50.00 (d) for the use of a Village Building, other than for a wedding ................................,....."..... 100.00 20. For the purposes of commercial photography or filming in that part of the Black Creek Conservation Area known as the Black Creek Pioneer Village, (a) for the use of the grounds and environs, (i) from 8:30 a.m. until midnight, per hour, excluding staff ...................,..,...,... 35.00 (ii) from midnight until 8:30 a.m., per hour, excluding staff ............,................. 100.00 (b) for the use of the interior of the buildings, (i) from 8:30 a.m. until midnight, per hour, excluding staff ......................,.".... 50.00 (ii) from midnight until 8:30 a.m., per hour, excluding staff ..................,........... 100.00 (c) for the rental of animals and equipment, excluding staff, (i) for a horse and vehicle, a. for the first hour ....................... 35,00 b. for each additional hour ....,............ 5.00 (ii) for a cow, ox or other animal, a. for the first hour ...................,... 25.00 b. for each additional hour ................. 5.00 (d) for the rental of costumes each, per day.......,.... 16.00 - 5 - B-332 (e) for participation by staff of the Authority, (i) in the case of a supervisor, per person, per hour, a. during open hours .......... ...................................... $ 10.00 b. after open hours ...... .................... ........................ 15.00 c. after midnight ........ .. ...... .... ................ .................. 25.00 (ii) in the case of security or maintenance personnel, per person, per hour, a. during open hours .. .... .................. .......... ............ 10.00 b. after open hours .......... ...................................... 15.00 c. after midnight .............................. ...... ................ 25.00 (iii) in the case of livestock handlers and drivers, per person, per hour, a. during open hours ........ ................................ ...... 7.00 b. after open hours .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 10,50 c. after midnight .................... ................................ 25.00 (iv) in the case of models or any other employees of the Authority, per person, per hour, a. during open hours ............ .................................. 7,00 b. after open hours .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 10.50 c. after midnight .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 15.00 21. For commerical photography or filming in any conservation area, except that part of the Black Creek Conservation Area known as Black Creek Pioneer Village, (a) for the use of the grounds and environs, excluding staff and equipment, per hour .... ........ .... ...... 15.00 (b) for participation by staff of the Authority, (i) during the usual working hours of the staff member, per person, per hour .......... 10,00 (ii) after the usual working hours of the staff member, per person, per hour ................ 15.00 (c) for use of Authority vehicles or tractors, including Authority staff to operate such vehicles or tractors, (i) during the usual working hours of the staff member, per vehicle, per hour .,...........,. 15.00 (ii) after the usual working hours of the staff member, per vehicle, per hour ............... 20.00 22. For school visits at Black Creek Pioneer Village, (a) for conducted tours, Monday to Friday, per student, per tour ........................................... 1.00 ~- 3 3 3 - 6 - (b) for the Christmas tour, per student, per tour ...,.. $ 2.50 (c) for the Pioneer Craft Program, per student, per program ......................................,..... 2.50 (d) for the Dickson Hill School Program, per student, per day ............................................ 1.25 23. For entrance to the Kortright Centre for Conservation, (a) for each person over fifteen years of age who is not a student, per day ..................,...........,.. 1.00 (b) for each person fifteen years of age or under, or each student with a student card, per day....,.....,.... .75 (c) for family consisting of one or two adults and their children who are fifteen years of age or under or who are students with a student card, maximum ...... 3.00 (d) for each person fifteen years of age or under or student who is part of a group of twenty-five persons or more, per person, per hour of program ... .50 (e) for an annual permit expiring on the 31st day of December in the year in which it was issued, (i) for a family consisting of one or two adults and their children who are fifteen years of age or under and who are students with a student card, per annum .................,... 25.00 (ii) for an individual, per annum ..... .....,...,. 15.00 24. For the use of a rifle range at the Cold Creek Conservation Area, (a) for a daily permit, per person .................".. 1.00 (b) for a group permit, not including week-ends or holidays, per season .......,....................,.. 50.00 (c) for a special event permit . . . . . . . . . . . . . . . . . . . . . . . . . 10.00 25. For the use of an archery range at the Cold Creek Conservation Area, (a) for a daily permit, per person ............,........ .50 (b) for a season group permit, not including week-ends or hol idays ........................................ 50.00 (c) for a special event permit .. ... ................. ... 10.00 26. For a special event permit for the use of the trap range at the Cold Creek Conservation Area, per event . . . . . . . . . . . . . . . . . . . . . 10.00 27. (1) For the use of an electric trap at the Cold Creek Conser- vation Area, (a) per day, per person ................,......,........ 1.00 (b) a group permit, per season. ... ...................., 100.00 (2) For twenty-five clay birds for use with an electric trap, plus Provincial Sales Tax ............................... 1.50 - 7 - B-334 28. For the use of a manual trap at the Cold Creek Conservation Area for use by up to five persons, (a) on Saturdays and holidays in the summer season, maximum of one hour ..............,................,. $ 2,00 (b) on Sundays, in the summer season, maximum of one hour 3.00 (c) on week days, other than holidays, in the summer season . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.00 (d) on any day during the winter season ..,.............. 2.00 29. For dog trails, at the Cold Creek Conservation Area, (a) for a group permit, per season .......,.............. 50.00 (b) for a special event permit . . . . . . . . . . . . . . . . . . . . . . . . . . 10.00 30. For a guided tour, during the maple syrup operation at Bruce's Mill Conservation Area, per person ........................... .50 31. Subject to items 33 and 34, for the rental of ski equipment, when available, consisting of skis, boots and poles, (a) for cross-country skiing, (i) for individuals fifteen years of age or over, plus P. S. T. , per day ..................... 7.00 after 1:00 p.m............... 5.00 (ii) for individuals under fifteen years of age, plus P. S . T . , per day ..................... 5,00 after 1: 00 p.m............... 3.50 (b) for downhill skiing, excluding the use of the ski lift, (i) for individuals fifteen years of age or over, p I us P. S . T . , per day .......,............, 7.00 after 1:00 p.m............... 5.00 (ii) for individuals under fifteen years of age, plus P.S.T., per day .....".............. 5.00 after 1:00 p.m............... 3.50 32. For the rental of snowshoes, when available, plus P.S.T., per day (a) for individuals fifteen years of age or over ........ 3.00 (b) for individuals under fifteen years of age ........., 2,00 (c) for each individual in a group, with a reservation ,. 2.00 (d) for each individual in a group including planned activity ............................................ 5.00 33. For each individual in a group, with a reservation, for cross country ski instruction, including the use of ski equipment and trai 1 s, per day ........................................... 5.50 34. (1) For the use of a ski lift for downhill skiing, for an ind- ividual equipped with downhill ski equipment, not including parking, per day ,...........,................"..,....... 3.00 ~- 33 5 - 8 - (2) For the use of cross-country ski trails at Albion Hills and Bruce's Mill, for an individual equipped with cross-country ski equipment, not including vehicle parking, per day, (a) for each person fifteen years of age or over ........ $ 1.00 (b) for each person under fifteen years of age .......... .50 (3) For the use of a ski lift for downhill skiing for a group with a reservation, a minimum fee of $100, per day to be charged as follows:- (a) for the use of the ski lift only, per person ........ 2,00 (b) for the use of the ski lift and downhill ski instruc- tion, per person ................................... . 4.00 (c) for the use of the ski lift and for rental of down- hill ski equipment as described in item 31, per person .............................................. 5.00 (d) for the use of the ski lift, downhill ski instruction and the rental of downhill ski equipment as described in item 31, per person .............................. 7.00 35. For entrance to the Claremont and Palgrave Conservation Areas during the winter season, per day, (a) for each person fifteen years of age or over ........ 1.00 (b) for each person under fifteen years of age .......... .50 36. For group cross-country skiing instruction, other than a group with a reservation, not including parking, (a) for persons fifteen years of age or over, for a l~ hour lesson, per person . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.50 (b) for persons under the age of fifteen years, for a l~ hour lesson, per person. ......................... 2.25 37. For group downhill skiing instruction, other than a group with a reservation, not including parking, (a) for a one hour lesson, per person, fifteen years of age or over ...................................... 4.00 (b) for a one hour lesson, per person, under fifteen years of age ..............................,.",..,.. 3,00 38. For individual one hour lessons for downhill or cross-country skiing, when available, per person .. .......................... 6.00 39. For fishing bait at Heart Lake and Glen Haffy Conservation Areas, per box ................................................ 2.00 40. For firewood, including delivery within a radius of thirty-two kilometers of the source of such firewood, per cubic metre .... 35.00 41. For the use of Cold Creek Conservation Field Centre, (a) for a day program for school children in grade 6 or any grade higher than grade 6 per person, per day... 5.00 - 9 - B-33 6 (b) for a bog walk for school children in grade 5 or any grade higher than grade 5 with a maximum group of thirty persons and a minimum charge of $15 per group, per person ..... ...... . ............ .................. $ .75 (c) for overnight camping for a minimum of ten persons to a maximum of thirty persons, including tents and firewood, per person, per night . . . . . . . . . . . . . . . . . . . . . 2.50 (d) for the rental of a winter sleeping bag, per night . . .75 42. For the Albion Hills Conservation Area Farm Program, (a) for a Farm Tour lasting approximately one hour, for school children in any grade, with a minimum charge of $15 per tour and a maximum group size of forty persons, per person, per tour ....................... .75 (b) for a Farm Tour lasting approximately two hours, for school children in grade 8 or any grade higher than grade 8, with a minimum charge of $30 per tour and a maximum group size of forty persons, per person, per tour .............................,.............. 1.50 (c) for the Farm Work Program for school children in grade 6 or any grade higher than grade 6, with a minimum charge of $20 per day and a maximum group size of twenty persons, per person, per day......... 2.00 (d) for the Farm Pioneer Life Program for school children in grade 4 or any grade higher than grade 4, with a minimum charge of $60 per day and a maximum group size of forty persons, per person, per day.......... 3.00 (e) for the Farm Maple Syrup Program for school children in grade 4 or any grade higher than grade 4, with a minimum charge of $60 per day and a maximum group size of forty persons, per person, per day.......... 3.00 43. For the Albion House Program, (a) for the half day Pioneer Life Program for school children in grade 4 or any grade higher than grade 4, with a minimum charge of $20 and a maximum group size of twenty persons, per person, per day......... 2.00 (b) for the full day Pioneer Life Program for school children in grade 4 or any grade higher than grade 4, with a minimum charge of $35 and a maximum group size of twenty persons, per person, per day......,....... 3.50 44. For the Conservation Education Program, per day, (a) at Albion Hills Conservation Field Centre ,.,......., 535,00 (b) at Claremont Conservation Field Centre ........,..... 535,00 45. For the purchase of, (a) wildlife shrubs, per shrub .......................... .50 (b) farm trees, per tree ................................ 3.00 B-337 SCHEDULE liE II TO: The Chairman and Members of the Executive Committee, M.T.R.C.A. Mee ting #15/1.9, Thursday-October-4-1979 FROM: W.A. McLean, Director, Planning and Policy RE: REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO In June, 1979, the Authority received the Report of the Working Group on the Mandate and Role of the Conservation Authorities in Ontario. With this report was a request from The Honourable James A.C. Auld, Minister of Natural Resources: "that each Conservation Authority provide copies of the report to its member municipalities, review the recommendations with the municipalities and ensure that municipal concerns and comments are included in the Authority's response to the document". In this connection, the Executive Committee at its Meeting #9/79 held June 27, 1979, resolved: "THAT the communication from The Honourable James A.C. Auld, Minister of Natural Resources and the Report of the working Group on the Mandate and Role of the Conservation Authorities of Ontario be received and appended to the Minutes; and THAT copies of the Minister's letter and the Report be circulated to the Authority's member municipalities for comment by August 15, 1979: and FURTHER THAT following receipt of municipal comments, staff be directed to prepare a report and recommendations for consideration by the Executive Committee." Subsequent to this information being forwarded to the municipalities, the Ministry extended the deadline for comment and the Authority revised its request accordingly to september 21, 1979. Municipal Response: The following municipalities have submitted responses to the Authority's request for comments: Metropolitan Toronto Region of York City of North York Town of Markham Borough of Scarborough Town of Richmond Hill Borough of East York Town of Whitchurch-Stouffville Region of Durham Township of Mono Town of Ajax Township of Adjala. The following municipalities have advised the Authority that comments will be prepared, however, have not been able to supply this information, to date: Borough of Etobicoke City of Toronto City of Mississauga. Of the comments received the following approved/endorsed the position stated by the Working Group or indicated that their municipality had no comment: Township of Adjala (no comment) Town of Ajax (endorsed) City of North York (approved) Borough of East York (support) Town of Markham (endorsed) Town of Richmond Hill (concurred) Town of Whitchurch-Stouffville (no comment). The Region of Durham requested the Minister for an extension to the deadline initially established and recommended: "That the Conservation Authorities, in the preparation of water management projects and other programs be required to work in conjunction and cooperation with municipalities during the formulative stages and that all such plans, projects and programs be circulated to the municipalities for comment on compatibility with municipal plans and financing prior to finalization of the n1"n_ nro;ect or proqram. " B-333 REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 2 The Borough of Scarborough reviewed the report and stated that: "In general we support the conclusions of the Working Group but would comment that the matter of financing should have been given greater consideration. Recommendation: l. That Council concur in principle with the conclusions of the task force. 2. That the revisions of the Planning Act presently under consideration by the Ministry of Housing contain references to the role of Conservation Authorities and provide for the resolution of conflicts and the combining of objectives. 3. That the Task Force be asked that further consideration be given to improved, more reliable methods of financing of Conservation Authority programs, and land acquisition. 4. That these recommendations, together with this report be forwarded to the M.T.R.C.A. in accordance with their request." Metropolitan Toronto referred the working Group report to the Parks, Recrea- tion and Property committee which prepared an analysis of the Report and submitted the following comment and recommendations: "In general terms, the following notes are intended to provide a brief overview of the relationship between Municipality, Conservation Authority, and the Province, in order to attempt to articulate some helpful comments to the Ministry of Natural Resources: _ The prime purposes of a Conservation Authority should be the protection of human life and property organized on the basis of watershed management. _ As an ancillary part of its programmes, Authorities may undertake programmes related to recreation, education, historical programmes, and forestry and wildlife management programmes. - Once an Authority is formed, it becomes an autonomous special purpose body and a mewDer municipality cannot opt out and is bound to contribute its share of various levies. _ If the Authority-member municipality relationship is sound, the Authority will in effect undertake programmes which are acceptable to its members. _ Since a Municipal/Provincial cost sharing basis exists, Authorities are affected by the financial limitations of either party, and these limitations are of prime importance to the operation of an Authority. It must be understood that in general in the 1950's and early 1960's, the limitation on such funding normally existed at the Municipal levell more recently the limitation has been imposed at the provincial level. - As the era of financial restraint has approached, it has become more and more difficult for Authorities, and hence its member municipality representatives, to achieve an acceptable balance between the fundamental programmes of an Authority and its perhaps more visible ancillary programmes. _ The only real opportunity that a member municipality has to influence either the day-to-day or long-term ambitions of the Authority is through its appointed representatives. _ Unless these representatives have a clear understanding of the goals and objectives of the 'member municipality, it is difficult to ensure that the Autho!ity will be so influenced. - It therefore follows that the municipality should clearly articulate its goals and objectives periodically in this regard, and its representatives should be appointed on the basis of their belief in them and willingness to articulate them at Authority meetings. - It also follows that as times change these representatives should _1...____ __-" ,.. _~_"'~~~ ..,,,,,1,.1 ho 11C:OTll1 Tor Council to consider a B-33 9 REPORT OF TilE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 3 review of its membership to ensure that there is both continuity with respect to input and, conversely, that the membership is rotated to ensure that current thinking may be introduced. - Finally, it is most important to note that in a relationship such as exists between ~Ietropol i tan Toronto and The Metropolitan Toronto and Region Conservation Authority, the Province must be urged to provide additional financing to the Authority for its prime functions. Metropolitan Toronto is impacted by development in surrounding regions, particularly in upstream areas, and watershed management techniques are most critical at this time. In fact, in large part programmes of the Authority are programmes of this municipality and the limitations imposed on funding at the Provincial level are tending to distort priorities as perceived at the Municipal level. A review of the foregoing indicates that, in an era of restraint such as we are now in, it is most important that this municipality clearly articulate its goals and objectives as they relate to The Metropolitan Toronto and Region Conservation Authority for the'coming ten-year period. Your Committee is the appropriate body to undertake this task, together with the staff of the Authority and the staffs of this Department and the Planning Department. It is equally important that Council appoint its representatives to the Authority on the basis of their belief in these goals and objectives and the representatives' willingness to work toward their achievement at the Authority level. Lastly, it is important that the Ministry of Natural Resources understand fully the necessity of providing adequate funding at the Provincial level for the prime functions of the Authority in order that watershed management programmes in Metropolitan Toronto and its surrounding region provide adequate protection for human life and property of Metropolitan citizens. Accordingly, I recommend that: 1) your Committee forward these comments to The Metropolitan Toronto and Region Conservation Authority as input to its response to the Minister of Natural Resources 1 2) your Committee develop a mechanism to provide Council with a statement of goals and objectives for The Metropolitan Toronto and Region Conservation Authority for the period 1981-1990 during the year 1980: 3) following the preparation and approval of this statement by Council, Metropolitan Toronto appointees to the Authority be made on the basis that such members will vigorously pursue these goals and objectives at Authority meetings: and 4) the Minister of Natural Resources be advised that, while this municipality believes in the validity of watershed management by Conservation Authorities, such Authorities must receive increased funding at the Provincial level for their prime function of watershed management if these special purpose bodies are to continue to serve the requirements of their member municipalities." The Regional Municipality of York considered a staff review which presented the following points for consideration: "Since the review does not suggest major changes, its endorsement by Regional Council would support the present role of the Conservation Authorities. Since their operations in the past have on the whole been positive, a general endorsement of the review is recommended. There are, however, some specific issues raised in the report that must be highlighted and in some cases a word of caution raised. 1) There should be a detailed clarification of the Conservation Authorities goals, policies and implementation techniques which should be stated in the Watershed Plan. This Plan in its effort to be comprehensive should ~ become ~ surrogate official pla~. The preparation of a Watershed Plan should involve close Munic1pal liaison at all staqes of preparation. B-3 40 REPORT OF THE WORKI~G GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 4 2) It is important to re-emphasize that Regional Council plays an important role in the Conservation movement through funding and the appointment of members to Conservation Authorities. Conservation Authorities should endeavour to keep the Councils of participating Municipalities well informed of their objectives and programs. This communication and cooperation is essential for the efficient and effective conservation of our resources. 3) Many Municipalities have two or more Conservation Authorities within their boundaries. In such a case adjacent Conservation Authorities should cooperate to insure that their approaches and policies are compatible so as not to confuse the public and complicate Regional Land Use Planning. 4) The legislative mandate in the "Conservation Authorities Act" is very broad. The specific responsibilities of Authorities should be established in consultation with participating municipalities." Council subsequently adopted the following recommendations, in this connection: " 1) Planning Committee and Council endorse the comments of its staff regarding this document. 2) Copies of this report be forwarded to both The Metropolitan Toronto and Region Conservation Authority and to the South Lake Simcoe Conservation Authority, to the Conservation Authorities' Branch, Ministry of Natural Resources and A.C.R.O. 3) Copies of this report and the A.C.R.O. brief be forwarded to the area municipalities of York for information." The A.C.R.O. brief referred to in this recommendation is that prepared by The Association of Counties and Regions of Ontario. The Minister in circulating the Report of the Working Group also requested comment from a number of municipal associations, one of which was A.C.R.O. While the Authority was not requested by the Minister to include the responses of such groups in its review of the Report, the following summary of the concerns of A.C.R.O. are provided, as information, since they are referred to by the Region of York and have been endorsed by one of the Authority's member municipalities, the Township of Mono. The following points are made in the A.C.R.O. response: - conservation authorities are special purpose bodies viewed with increasing concern by municipalities - conservation authorities should limit their activities to water management - preliminary conservation authority budgets should be circulated to all member municipalities for comment in advance of adoption by an authority - the parks and recreation role of authorities be limited to providing intermunicipal populations with natural resource based opportunities - there is'a serious lack of "local initiative and involvement" in conservation authorities in many parts of the Province - conservation authorities should not have as broad a mandate as stated in the Act, ie. should be concentrating on flood and erosion control and direct water management - supports the preparation of a Watershed Plan but is concerned with its relationship to local official plans - supports the authorities' role in flood and erosion control, however, is not convinced that such a body is the only means of achieving these objectives - while recognizing the "impact of land use decisions on flood and erosion control feels that development control should be achieved through local planning'process: this is also sufficient to protect unique and sensitive resources - authorities should only acquire lands essential for primary objectives and not because they are marginal or for purposes of forest management, fish and wildlife habitat improvement, outdoor recreation or conservation education 8-34 1 . REPORT OF THE WORKING GROUP ON THE MANDATE AND ROLE OF THE CONSERVATION AUTHORITIES OF ONTARIO PAGE 5 _ support the management of authority lands by others for those uses which do not relate direc~ly to flood and erosion control ana wa~er management - strongly opposes the assignment of additional .program responsibilities to authorities _ recommends that all appointees to authorities be municipal elected representatives appointed by municipal councils _ agrees that increased communication with municipalities and the public is required _ believes there should be a clearer delineation of responsibilities between authorities and the district ofjices of the Ministry of Natural Resources and that the Ministry not delegate further responsibility to authorities. Summary: Generally, the Authority's member municipalities have supported and endorsed the Report of the Working Group as a conceptual framework within which the specific areas of Authority activity can be defined. This seems an appropriate response in that the working Group is attempting to produce a general policy document for thirty-nine conservation authorities, each of which will have specific resource management problems to address within their areas of jurisdiction. RECOMMENDATIONS: IT IS RECOMMENDED THAT the Executive Committee inform the Ministry of Natural Resources of its support of the recommendations of the Report of the Working Group on the Mandate and Role of the Conservation Authorities of OntarioJ and THAT the staff report concerning the municipal responses to the Report of the Working Group be received and forwarded, along with copies of each municipality's individual comment, to the Ministry of Natural ResourcesJ and FURTHER THAT copies of any subsequent municipal replies, received too late for inclusion in this report, also be forwarded to the Ministry. 1979.09.25. ACD/mm ~ B-342 , the metropolitan toronto and region conservation authority minutes Report #16/79 EXECUTIVE co~mITTEE WEDNESDAY-OCTOBER-24-1979 116/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, October 24, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar Mrs. J.A. Gardner C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Adm. - Historical Sites Division R.K. Cooper Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Planning Technician, Planning & Policy Miss A. Aitken Research Planner, Planning & Policy Mrs. A.C. Deans Project Planner, Water Resource Division T.E. Farrell Development Co-ordinator, Planning & Policy J.W. Maletich HEARING Following the Roll Call, the meeting recessed to hold a Hearing re: Mr. Antonio Ieraci Town of Markham Rouge River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Property & Administration Division W.E. Jones Planning Technician, Planning & Policy Miss A. Aitken Research Planner, Planning & Policy Mrs. A,C. Deans Head, Waterfront Section, WRD B.E. Denney Development Co-ordinator, Planning & Policy J.W. Maletich Supervisor, Accounting Services, FD Mrs. M. Mosseau Supervisor, Property Administration, P&AD D.J. Prince B-343 -2- ABSENT WERE Members M,J. Breen E.H. Card MINUTES The Minutes of Meeting #15/79 were presented. Res. #424 Moved by: C.F, Kline Seconded by: MrS, J.A. Gardner RESOLVED THAT: The Minutes of Meeting #15/79, as presented, be adopted as if read. CARRIED ~ SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS ITS ADOPTION: l. INFORMATION & EDUCATION DIVISION -1979 Budget Revisions Water & Related Land Land Management - Community Relations (Deve lopmen t) W.IO: Lake St. George Conservation Field Centre A staff communication was presented regarding adjustments to the 1979 BUdget for the Information & Education Division. Res. #425 Moved by: Dr. T.H. Leith Seconded by: Mrs, F. Gell RESOLVED THAT: The 1979 Budget Revisions to Water and Related Land Management - Community Relations (Development ) (W.IO) , be received and appended as Schedule "A" of these Minutes~ and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The 1979 Budget Revisions to Water and Related Land Management - Community Relations (Development) (W.IO) be included in the 1979 Budget Estimates of the Authority. CARRIED~ SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 2. STAFF FINANCIAL PROGRESS REPORI' -July 1 - September 30, 1979 The staff presented a Financial Progress Report for the period July 1 to September 30, 1979. Res. #426 Moved by: M.W.H. Biggar Seconded by: Dr. T.H. Leith RESOLVED THAT: The Staff Financial Progress Report for the period July 1 to September 30, 1979, be received and appended as Schedule "B" of these Minutes. CARRIED ~ MRS. GARDNER requested that a letter be written to the Council of the City of Toronto advising them of the shoreline stabilization work and boardwalk reconstruction proposed at the Eastern Beaches. 3. 17TH BIENNIAL CONFERENCE: CONSERVATION AUTHORITIES OF ONTARIO, WANDLYN INN, TRENTON, ONTARIO, SEPTEMBER 15-16-17, 1980 A staff communication .was presented advising that a request has been received from the Lower Trent Region Conservation Authority to forward preregistration advice regarding the above-noted conference to them no later than November 1, 1979. -3- B-344 Res. #427 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: The Secretary-Treasurer be requested to advise the Lower Trent Region Conservation Authority that The Metropolitan Toronto and Region Conservation Authority expects to register 12 delegates to the 17th Biennial Conference of Conservation Authorities scheduled for September 15-16-17, 1980 at the Wandlyn Inn, Trenton, Ontario. CARRIED; 4. AUTHORITY ANNUAL DINNER -AND- STAFF CHRISTMAS PARTY Res. #428 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey RESOLVED THAT: The Secretary-Treasurer be authorized and directed to make such arrangements as may be necessary for: (a) The Annual Dinner of the Authority at the Weston Golf and Country Club - Wednesday, December 5, 1979; (b) The Annual Staff Christmas Party - Saturday, December 15, 1979. CARRIED; 5. QUOTATION #79-45 -1979 MF-30B Diesel Tractor with Loader A staff communication was presented advising that the following quotations have been received for the supply and delivery of one MF-30B Diesel Tractor with Loader, on a trade-in basis: Don Vallance Equipment Ltd. $15,782.50 Edwards Equipment $17,387.50 Sholdice Service $18,993.75 Rumble Tractor $20,330.00 The above prices include all taxes. Res. #429 Moved by: J.S. Scott Seconded by: M.W.H. Biggar RESOL VED THA T: The quotation received from Don Vallance Equipment Limited for the supply and delivery of one new 1979 MF-30B Diesel Tractor, with Loader, on a trade-in basis, in the sum of $15,782.50, including all taxes, be accepted~ it being the lowest quotation received. CARRIED; 6. ALBION HILLS CONSERVATION AREA -Quotation #79-52 : Camp Supervisor's Office/Residence, Windows A staff communication was presented advising that the following quotations (of 3 invitations) have been received for the supply of 15 Aluminum Frame Windows, double glazed, with screens for the Camp Supervisor's Office/Residence at the Albion Hills Conservation Area: Thermoseal Industries Ltd. $ 1,759.80 A.N.C. Glass Products Ltd. $ 1,950.00 The above prices include Federal Sales Tax Provincial Sales Tax exempt Res. #430 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The quotation received from Thermoseal Industries Limited for the supply of 15 Aluminum Frame Windows, double glazed, with screens, for the Camp Supervisor's Office/Residence, Albion Hills Conservation Area, in the sum of $1,759.80, including Federal Sales Tax (Provincial Sales Tax exempt), be accepted; it being the lowest quotation received. CARRIED; B-345 -4- 7. QUOTATION #79-50 -Fire Pump A staff communication was presented advising that the following quotation has been received from Wajax Industries Limited for the supply of one new Mark III Fire Pump: Wajax Industries Limited $1,393.72 This price includes all taxes Res. #431 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The quotation received from Wajax Industries Limited for the supply of one new Mark III Fire Pump, in the sum of $1,393.72, including all taxes, be accepted; it being the only suitable equipment available, CARRIED; 8. GLEN HAFFY AND HEART LAKE CONSERVATION AREAS -Quotation #79-47: Rainbow Trout A staff communication was presented advising that the following quotation has been received for the supply of 45,000 Rainbow Trout fry for rearing at the Glen Haffy hatchery to supply the Glen Haffy and Heart Lake ponds: Spring Valley Trout Hatchery $28.00/M This was the only quotation received (of 5 invitations). Res. #432 Moved by: Dr. T.H, Leith Seconded by: C.F. Kline RESOL VED THAT: The quotation received from Spring Valley Trout Hatchery, for the supply of 45,000 Rainbow Trout fry for the Glen Haffy hatchery, in the sum of $28.00/M, be accepted; it being the only quotation received. CARRIED, 9. COLD CREEK CONSERVATION AREA -Quotation #79-44B: Trap Range Control Building A staff communication was presented advising that the following quotations have been received for the supply, delivery and erection of a prefabricated structure of app~ximately 900 sq.ft., on a foundation supplied by the Authority, at the Cold Creek Conservation Area. Plumbing, electrical and septic systems will be carried out by Authority staff or by sub-contractors. Viceroy Homes $16,857,00 Colonial Homes Limited $19,555,00 Precision Homes Corp. Inc. $23,649.50 Pacific Prefab Limited $24,045.00 Valhalla Homes Limited $26,800,00 All prices include Federal Sales Tax Res. 1433 Moved by: Dr. T.H. Leith Seconded by: C,F, Kline RESOLVED THAT: The quotation received from Viceroy Homes for the supply, delivery and erection of a prefabricated structure of 960 sq.ft., including 40' x 8' porch, in the sum of $16,857.00, including Federal Sales Tax, be accepted; it being the lowest quotation received. CARRIED, 10. ALBION HILLS & COLD CREEK CONSERVATION AREAS -Quotation 179-51: Septic Systems A staff communication was presented advising that the following quotations (of 5 invitationsl have been received for the supply of all materials and labour for the installation of two septic systems: one system will service the Albion Hills Campground Supervisor's Office/Residence; the second is required in con- junction with the Trap Range Control Building to be constructed at the Cold Creek Conservation Area: -5- B-346 Albion Hills Cold Creek John Scoles Septic Pumping $1,100.00 $1,800.00 J. Barry Smith $1,268.80 $2,787.00 Res. #434 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The quotations received from John Scoles Septic Pumping for the material and installation of a septic system to service the Albion Hills Campground Supervisor's Office/Residence, in the sum of $1,100.00; and a septic system to service the Cold Creek Trap Range Control Building, in the sum of $1,800.00, be accepted; these being the lowest quotations received. CARRIED; 11. DECISION OF HEARING -Mr. Antonio Ieraci Town of Markham Rouge River Watershed Res. #435 Moved by: Mrs. J.A. Gardner Seconded by: J.S. Scott BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 24th day of October, 1979; and THAT the application of Mr. Antonio Ieraci, in accordance with Ontario Regulation 735/73, for permission to place fill and erect two single- family dwellings on Lots 40 and 41, Plan 173, located on the south side of Nelson Street at Magill Street, Town of Markham (Rouge River water- shed) , be refused for the following reason: .That the application, as submitted, will affect the conservation of land. CARRIED; 12. FINANCIAL REPORT AND ACCOUNTS -September, 1979 Mr. Scott presented the Financial Report and Accounts for the month of September, 1979. Res. #436 Moved by: Mrs. J.A. Gardner Seconded by: J.S. Scott RESOLVED THAT: The Financial Statement for the month of September be received; and that the payment of the Authority accounts, in the amount of $1,263,680.00, being (a) Current Expenditures - Wages and Salaries $471,565.65; Materials & Supplies $317,833.45; (b) Capital Expenditures - Wages & Salaries $45,858.66; Materials & Supplies $415,248.52; and (c) Other Programs - Wages & Salaries $8,912.62; Materials & Supplies $4,261.10, be approved. CARRIED; 13. ANNUAL GLOBAL PROFESSIONAL DAY - PROTESTANT SCHOOL BOARD OF GREATER HULL, FRIDAY, NOVEMB ER 2, 1979 -Attendance at A staff communication was presented advising that Miss Ann Hayhoe has been invited to attend the Annual Global Professional Day, sponsored by the Protestant School Board of Greater Hull, on Friday, November 2, 1979. The School Board has offered to pay Miss Hayhoe's expenses in this connection. Res, 1437 Moved by: Dr. T,H. Leith Seconded by: E.V. Kolb RESOLVED THAT: Miss Ann Hayhoe, Head, Education Section, Information and Education Division, be authorized to attend the Annual Global Professional Day to be held at Hull, Quebec, November 2, 1979, in place of the Ontario Museum Association Conference in Barrie, Ontario (authorized at Executive Meeting 14/79) . CARlUEDJ B-347 -6- 14. REVIEW OF THE REGIONAL MUNICIPALITY OF DURHAM ACT A staff communication was presented, advising that at Executive Committee Meeting #15/79, held October 4, 1979, a communication was received from the Council of The Regional Municipality of Durham, inviting the Authority to submit a brief for consideration in connection with a review of The Regional Municipality of Durham Act (Bill 162). As directed by Committee, staff presented a brief for consideration. Res. #438 Moved by: E.V. Kolb Seconded by: Mrs. L. Hancey RESOLVED THAT: The "Submission to The Regional Municipality of Durham Concerning the Review of The Regional Municipality of Durham Act, The Metropolitan Toronto and Region Conservation Authority" be approved and forwarded to The Regional Municipality of Durham; and THAT Mrs. S. Martin and Mr. J.S. Scott, as members of theR.D.H.P. Advisory Board serving on the Executive Committee, and Mr. W.A. McLean, Director of Planning and Policy, represent the Authority in presenting this submission at the Public Meeting to be held in Pickering on November 1, 1979. CARRIED; 15. WATERSHED PLAN PREPARATION A staff communication was presented advising that the bulk of the background studies required to provide a data base for the Watershed Plan is now com- pleted and work is progressing toward the finalization of the various program components. The work has been separated into two major components - Water and Related Land Management and Conservation and Recreation Land Management. There remains a considerable overlap wherein certain parts cannot be finalized before others; e.g. conservation and recreation land management plans cannot be finalized for areas with proposed reservoirs until such time as the flood control requirements are identified and the flood control component finalized. As each draft program component is completed, this information is being forwarded for discussion at the appropriate Advisory Board. In addition, Staff is presenting this information to municipal staff for review. Res. #439 Moved by: Mrs. S. Martin Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff report regarding the progress of Watershed Plan preparation be received. CARRIED; 16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. & Mrs. John Darroch To place fill at 41 Springbank Avenue, Borough of Scarborough (Waterfront) A staff communication was presented advising that an application has been received from Mr. & Mrs. J. Darroch to place fill at the rear of their property at the above location. Res. #440 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Mr. & Mrs. John Darroch, be received; and THAT the application of Mr. & Mrs. John Darroch for a permit to place fill at 41 Springbank Avenue, Borough of Scarborough, be approved, subject to: (a) All necessary safety precautions being taken for the trucks dumping, as well as for people walking along the beach; (b) Clean, solid rubble only being used, and all landfill being to the satisfaction of the Authority; -7- B-348 (c) Supervision of dumping being provided for all hours of operation; (d) Approvals being received from adjacent property owners if their property is affected; (e) Owners carrying out final slope rehabilitation in the form of seeding and/or tree planting; (f) All other necessary approvals and permits being obtained; (g) The Authority being notified at least one week prior to the start of dumping. CARRIED; 17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Family Leisure Centres of Canada Limited To install a PVC watermain and two polyethylene force- mains crossing tributary of the Don River, south of Major Mackenzie Drive, west of Keele Street, Town 0 f Vaughan (Don River Watershed) A staff communication was presented advising that an application has been received from The Family Leisure Centres of Canada Limited for permission to install a watermain and two forcemains across a tributary of the Don River at the above location. Res. #441 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of The Family Leisure Centres of Canada Limited, be received; and THAT the application of The Family Leisure Centres of Canada Limited for permission to install a watermain and two forcemains across the Don River on Lot 19, Concession 4 (Don River watershed) , be approved, subject to: .All areas disturbed due to construction being restored to the satisfaction of The Metropolitan Toronto and Region Conservation Authority. CARRIED; 18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ian W. Nicholl, Architect -on behalf of- John A. Coates To place fill and erect a dwelling in the Hamlet of Whi tevale, also known as Part Lot 32, Concession 5, Town of Pickering (Duffin Creek Watershed) A staff communication was presented advising that an application has been received from Ian W. Nicholl, Architect, on behalf of John A. Coates, for permission to alter the grades at the above-noted site. Res. #442 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The application of Ian W. Nicholl, Architect, on behalf of John A. Coates, for a permit to place fill and erect a dwelling in the Hamlet of Whitevale, Part of Lot 32, Concession 5, Town of Pickering (Duff in Creek watershed), be approved, subj ect to: .Site grading taking place in accordance with the site plan, Project No. 1479, Drawing #2, prepared by Ian W. Nicholl, Architect, and dated September 24, 1979, which forms part of the permit, and to the satisfaction of the Authority and of the Town of Pickering. CARRIED; 19. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 City of Brampton To construct six pedestrian crossings of the Etobicoke Creek and one crossing of the West Humber River as a component of park .development in the City of Brampton A staff communication was presented advising that an application has been received from the City of Brampton Parks & Recreation Department for permission to construct 6 pedestrian crossings on the Etobicoke Creek and 1 on the West Humber River. B-349 -8- Res. #443 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the City of Brampton Parks & Recreation Department, be received; and THAT the application of the City of Brampton Parks & Recreation Department for permission to construct: (a) two crossings on Lot 14, Concession 1, E.H.S.. Etobicoke Creek Watershed (b) one crossing on Lot 13, Concession 1, E.H.S., Etobicoke Creek Watershed (c) one crossing on Lot 9, Concession 1, E.H.S., Etobicoke Creek Watershed (d) one crossing on Lot 4, Concession 3, E.H .S. , Etobicoke Creek Watershed (e) one crossing on Lot 3, Concession 1, W.H.S. , Etobicoke Creek Watershed ( f) one crossing on Lot 16, Concession 10, N.D. , Humber River Watershed be approved, subject to: (A) All work being done in accordance with Drawings 1 to 8, Project No. M2680.~ dated September 1979, as prepared by Triton Engineering Services; (B) All disturbed areas being restored to the satisfaction of The Metropolitan Toronto and Regio~ Conservation Authority. CARRIED; 20. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Top,view Investments To relocate a small tributary of the Rouge River on Part of Lot 1, Plan 2196, Town of Markham A staff communication was presented advising that a request has been received from Topview Investments for permission to relocate the small water- course on the above site to flow closer to the southern and eastern boundaries of the property. Res. #444 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Topview Investments, be received; and THAT the application of Topview Investments for permission to relocate a watercourse on Lot 1, Plan 2196, Town of Markham (Rouge River watershed) , be approved, subj ect to: (a) All work being completed to the satisfaction of the Town of Markham and of the Authority; (b) Rip rap being placed on the outside of stream bends as indicated on the si te plan forming part of this permit; (c) Every effort being made to minimize silting of the creek during construction. CARRIED; 21. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ari J. Investments Limited To construct a storm sewer outfall on a tributary of the Don River, Town of Richmond Hill A staff communication was presented advising that an application has been received from Ari J. Investments Limited for permission to construct a storm sewer outfall at the above location. Res. #445 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Ari J. Investments Limited, be received; and THAT the application of Ari J. Investments Limited for permission to construct a storm sewer outfall on Lot 37, Concession 1, Town of Richmond Hill (Don River watershed) , be approved, subject to: -9- B-350 (a) All work being carried out in accordance with Drawings Nos.l, 2, 3 and 8, Project No.8193-02, dated July 1979, as prepared by M.M. Dillon Ltd.; (b) All disturbed areas being restored to the satisfaction of The Metropolitan Toronto and Region Conservation Authority. CARRIED; 22. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 D. Miklas & Associates Limited To construct a storm sewer outfall on Part of Lot 21, Concession 4, Town of Markham (Rouge River Watershed) A staff communication was presented advising that an application has been received from D. Miklas & Associates Limited, on behalf of Paradelle Developments, for permission to construct a storm sewer outfall draining into a branch of the Rouge River at the above location. Res. 1446 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of D. Miklas & Associates Limited, on behalf of Paradelle Developments, be received; and THAT the application of D. Miklas & Associates Limited on behalf of paradelle Developments, for permission to construct a storm sewer outfall on Part of Lot 21, Concession 4, Town of Markham (Rouge River watershed), be approved, subject to: (a) All work being completed in accordance with Project #Y-MI027, Drawing No.13, as prepared and revised by D. Miklas & Associates Limited, which forms part of the permit; (b) Every effort being made to avoid the siltation of the watercourse during construction of the outfall. CARRIED; 23. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Woodbine Downs Limited To install a storm sewer outfall into the Humber River, south side of Finch Avenue and west side of Humber College Boulevard, Borough of Etobicoke (Humber River Watershed) A staff communication was presented advising that an application has been received from Woodbine Downs Limited for permission to install a storm sewer outfall into the Humber River at the above location. Res. 11447 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Woodbine Downs Limited, be received; and THAT the application of Woodbine Downs Limited for permission to install a storm sewer outfall into the Humber River on Lot 34, Concession IV, Borough of Etobicoke (Humber River watershed), be approved, subject to: (a) All work being carried out in accordance with the engineering drawings Nos. MB-6669 and PDB-1449, as prepared by Urban Engineering Consultants, prepared for the Borough of Etobicoke; (b) All work being completed in accordance with Borough Engineering standards; ( c) Every effort being made to minimize silting of the river during con struction. 24. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 CARRIED; City of Brampton To construct a storm sewer outfall on the Etobicoke Creek A staff communication was presented advising that an application has been received from the City of Brampton for permission to construct a 24" storm sewer outfall from a proposed commercial and recreation centre site. B-351 -10- Res. #448 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the City of Brampton, be received; and THAT the application of the City of Brampton for permission to construct a storm sewer outfall on Lots 9 and 10, Concession 4E, City of Brampton (Etobicoke Creek watershed), be approved, subject to: (a) All work being carried out in accordance with Drawing #7850-A-l, as prepared by Paul Theil Associates Limited and dated September, 1979; (b) Gabion baskets being preceded by a filter mat or a 6"-12" layer of crushed stone or gravel; (c) Every effort being made to minimize erosion and siltation of the creek during construction. CARRIED 1 25. WATERFRONT PROJECT 1977-1981 -Property: Guildwood (West) Limited Res. #449 Moved by: Mrs. S. Martin Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Report (October 15, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED 1 "Re: Project: Waterfront Project 1977-1981 Scarborough Sector Authority: Executive Resolution No.460, Meeting No.23 - January 21, 1976 and Authority Resolution No.46, Meeting #3 - April 9, 1976 Subject Property: South of Sylvan Road Owner: Guildwood (West) Limited Area to be acquired: 4.900 acres, more or less Recommended purchase price: $10,000.00, plus Vendors' legal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Water Lot in front of Lot 16, Concession "C", Borough of Scarborough, The Municipality of Metropolitan Toronto, located south of Sylvan Road, east of Markham Road. "Negotiations have been conducted with officials of Guildwood (West) Limited, and their solicitor, Mr. E.J. Pivnick, of the legal firm Pivnick & Morrow, 111 Richmond Street West, Toronto, M5H 2G4, and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be $10,000.00, plus vendors' legal costs, with date of completing the transaction to be as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate." 26. FIRST BOLTON SCOUT HUT, VILLAGE OF BOLTON TOWN OF CALEDON A staff communication was presented advising that the Bolton Youth Group (Incorporated), in conjunction with the Town of Caledon, proposes to construct a replacement building at a new location in the Ted Houston Park on the western edge of Bolton, the original building having been destroyed by fire on October 31, 1978. -11- B-352 Res. #450 Moved by: E.V. Kolb Seconded by: J.S. Scott RESOLVED THAT: Upon satisfactory completion of the demolition and site restoration work at the fire site of the First Bolton Scout Hut by the Town of Caledon, the Authority transfer the sum of $5,250.00, representing the proceeds from the Authority's fire insurance coverage, to the Town of Caledon, to be used for construction of a replacement building in the Ted Houston Park on the western edge of Bolton. CARRIED; 27. WATERFRONT PROJECT 1977-1981 -Property: The Toronto Harbour Commissioners and The Corporation of the City of Toronto Res. #451 Moved by: Mrs. S. Martin Seconded by: C.F. Kline RESOLVED THAT: The Report (October 17, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purChase. CARRIED; "Re: Project: Waterfront Project 1977-1981 Ashbridge's Bay Sector Authority: Executive Resolution #460, Meeting #23 - January 21, 1976 and Authority Resolution 146, Meeting #3 - April 9, 1976 Subject Property: South side of Lakeshore Boulevard East OWner: The Toronto Harbour Commissioners and The Corporation of the City of Toronto Area to be acquired: 61.152 acres, more or less Recommended Purchase Price: Nominal consideration of $2.00, plus vendors' legal costs "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being all of Lots 124 to 138 inclusive and Parts of Block "K" and Road and Part of the "Reserve for Park Development", Registered Plan 520E and Part of the marshlands in Lake Ontario patented to the City of Toronto in 1880 - City of Toronto, The Municipality of Metropolitan Toronto, located on the south side of Lakeshore Boulevard East, west of Woodbine Avenue. "Negotiations have been conducted with officials of the Toronto Harbour Commissioners and the Corporation of the City of Toronto and, subject to the approval of your committee, agreement has been reached with respect to a purchase price, as follows: The purChase price is to be the nominal consideration of $2.00, plus vendors' legal costs, with date of completing the trans- action to be as soon as possible. HI recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "Funds are available. "An application has been made to the Ministry of Natural Resources for an Inspection Certificate." 28. WATERFRONT PROJECT 1977-1981 -Working Agreement with the Toronto Harbour Commissioners A staff report was presented advising that the Toronto Harbour Commissioners carry out landfi11ing operations for the Authority under the terms of the WC1rking Agreement which was executed in 1972. The Harbour Commissioners are "questing an increase in the overhead charge from 15% to 20% and an increase :1 machine rates by an average of 17%. }~es . '452 Moved by: Dr. T.H. Leith Seconded by: Mrs. F. Ge11 RESOLVED THAT: The report on the Working Agreement with the Toronto Harbour B-353 -12- Commissioners be received; and THAT the Works Division overhead charge be increased from 15% to 20%, and that increases in the plant rates, averaging 17%, be approved; AND FURTHER THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 29. PROJECT W.C.-6l - DUFFIN CREEK CHANNEL IMPROVEMENTS, TOWN OF \oJHITCHURCH-STOUFFVILLE -Extra Work Order #l A staff communication was presented advising that the following Change Order has been received from Kilborn Limited to the contract for the above project: Change Order #1 To remove and relocate existing 8" dia. sanitary sewer on Market Street between Main Street and Somerville Street (including supply and installation of approximately 65-70 metres of new 8- dia. clay pipe, stone bedding and granular backfill, 1200 MM manhole and benching) . Res. #453 Moved by: Mrs. F. Gell Seconded by: Mrs. L. Hancey RESOLVED THAT: Extra Work Order #1 to the contract for Project W.C.-61 - Duffin Creek Channel Improvements, Town of Whitchurch-Stouffville - in the amount of $11,000.00, be approved. CARRIED; 30. WATERFRONT PROJECT 1977-1981: ETOBICOKE SECTOR, HUMBER BAY WEST PHASE II -Consulting Services A staff report was presented advising that a proposal has been received from Johnson Sustronk Weinstein & Associates Limited for consulting services to completion of the above project at an estimated cost of $75,000.00. Res. #454 Moved by: Mrs. S. Martin Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff report on consulting services for Humber Bay West Phase II, Waterfront Project 1977-1981, be received; and THAT the firm of Johnson Sustronk Weinstein & Associates Limited be retained to complete the design and construction supervision required for the remainder of the project, at an estimated upset fee of $75,000.00; AND FURTHER THAT the approval of the Province of Ontario be requested. CARRIED 1 3l. BLACK CREEK PIONEER VILLAGE -Quotation: Portables - Tar & Gravel Roofs A staff communication was presented advising that the following prices have been received for replacing the tar and gravel roofs on the two portables which have been moved into the Village: W. Jansen $2,600.00 Bob McLaughlin $2,680.00 Pea tson $3,294.00 Res. #455 Moved by: Mrs. F. Gell Seconded by: J.S. Scott RESOLVED THAT: The firm 0 f W. Jansen be engaged to replace the roofs on the two portables at Black Creek pioneer Village at a cost of $2,600.00. CARRIED; -13- 8-354 32. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation #79-46: Road Improvements A staff communication was presented advising that the following quotations have been received for the supply and delivery of road gravel, Granular "A" and Granular "B" for improvements to the existing road at Lake St. George, and for the road to the Stage II dormitory: Granular "A" Granular "B" Gormley Sand & Gravel @ $3,40 per ton @ $2.00 per ton Lee Sand & Gravel Limited @ $3.20 per ton @ $2.20 per ton Superior Sand & Gravel @ $4.70 per ton @ $3.45 per ton It is estimated that approximately 1,100 tons of Granular nA" and 1,400 tons of Granular nB" will be used. Res. #456 Moved by: Mrs. L, Hancey Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The quotation of Gormley Sand & Gravel for the supply and delivery of road gravel to the Lake St. George Conservation Field Centre, at $3.40 per ton of Granular "A" and $2.00 per ton of Granular "B" be accepted; it being the lowest quotation received. CARRI ED; 33. WATERFRONT PROJECT 1977-1981 SCARBOROUGH SECTOR -East Point Park: Consulting Services, Master Plan Review & Site Plan Preparation A staff communication was presented advising that at Meeting '1/78, the Executive Committee adopted a recommendation to retain the firm Hough Stansbury & Michalski Limited to review the existing Master Plan for East Point Park and to prepare site plans for implementation. The estimated fee was $69,000.00. The consultants have requested an additional amount of $11,000.00 to offset the higher-than-expected costs of some parts of the study and to complete the report and plans to the satisfaction of the Authori ty. Res. #457 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff report on Consulting Services for East Point Park be received; and THAT the request of Hough Stansbury & Michalski Limited for an additional fee of $11,000.00 to complete the Master Plan review and site plan preparation be approved; AND FURTHER THAT approval of the Ministry of Natural Resources be requested. CARRIED; NEW BUSINESS 34. PROGRESS REPORTS ON ACTIVITIES OF THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY -Presentation to Member Municipalities Res. *458 Moved by: Mrs. L. Hancey Seconded by: Dr, T.H. Leith RESOLVED THAT: The staff be requested to prepare progress reports on activities of The Metropolitan Toronto and Region Conservation Authority for presentation to member municipalities by January, 1980. CARRIED; 35. STORMWATER MANAGEMENT CONFERENCE, MINISTRY OF HEALTH BUILDING, TORONTO: NOVEMBER 15, 1979 -Attendance at Res. 1459 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith B-355 -14- RESOLVED THAT: Mrs. J .A. Gardner be authorized to attend the Conference on Storm- water Management to be held November 15, 1979 at the Ministry of Health Building, Toronto; and THAT her expenses in connection therewith, in the amount of $20.00, be paid. CARRIED; 36. ORGANIZATIONAL REVIEW, PHASE I, THE METROPOLITAN TORONTO & REGION CONSERVATION AUTHORITY -Final Report MR. SCOTT advised that the above-noted report has been received and that a meeting would be convened on Friday, November 9, 1979, commencing at 10:00 a.m. at the Authority office to consider the report. 37. THE METROPOLITAN TORONTO & REGION CONSERVATION FOUNDATION -Appointment of Secretary-Treasurer -&- Assistant Secretary-Treasurer The committee was advised that Mr. W.E. Jones had been appointed Secretary- Treasurer and Mrs. C.A. Hayden Assistant Secretary-Treasurer of The Metropolitan Toronto and Region Conservation Foundation, effective October 18, 1979. 38. "CONSERVATION BY THE PEOPLE": PRESENTATION OF FUNDS FROM SALE OF -Miss Catherine Richardson The Chairman introduced Miss Catherine Richardson, stating that he had known Dr. Arthur Herbert Richardson and his family for many years. Proceeds from Dr. Richardson's book "Conservation by the People" have been donated, in the past, for various Authority projects. The balance of cash from sales of her father's book is now being designated by Cathy for deposit to the Black Creek Growth Endowment Fund. Mrs. Gell expressed appreciation on behalf of the Foundation, and Miss Richardson presented the cheque, in the amount of $1,071.95, to Mr. Henderson. Mr. Higgs advised the members that he had had a very strong relation~hip with Dr. Richardson during his years as Chairman of the Authority, and received a great deal of advice from him in his early days with the Humber Valley Conservation Authority. All who knew him as the first Chairman of The Metropolitan Toronto and Region Conservation Authority had the deepest admiration for Herbert Richardson. As a token of the Authority's appreciation, the Chairman presented Miss Richardson with a set of 4 framed colour prints, depicting scenes of pioneer life at the Village. Miss Richardson thanked the members, stating that possibly one of the great- est loves of her father's life had been the Village, of which he was Honorary Reeve for one year. On later occasions in her father's life, she had taken his place at Village functions, and felt she had grown up with everybody. The pictures will be much appreciated in her new home. The Chairman advised that Miss Richardson had also presented the Authority with Dr. Richardson's reports and other memorabilia which are presently stored at the Kortright Centre for Conservation. Included is a rosewood gavel presented to Dr. Richardson in his first year as Chairman of the Authori ty. It is intended to have the gavel mounted in the Humber Room at the Authority office. The collection of Herbert Richardson memorabilia will be put on display at the Kortright Centre. 39. ADJOURNMENT On Motion, the Meeting adjourned at 12:30 p.m., October 24. R.G. Henderson K.G. Higgs Chairman Secretary-Treasurer 1 9 7 9 BUD GET REV I S ION S PAGE: 23- PROGRAM: Water and Related Land Management - Community Relations (Development) W.10 DATE: October 24. 1979 o RIG I N A L BUD GET REV I SED BUDGET Sourccs of Financing Sources of Financing ~et Provincial Municipal Net Provincial ~Iun i c i pal .ACTIVITY Expenditures Grant Lcvy Othcr Expenditures Grant Lcv)' Other Kortright 292,472 41,800 34,200 216,472 - - - - Albion Hills C.F.C. 7,000 - - 7,000 - - - - Lake St. George - Phase I 171,722 - - 171,722 - - - - - Phase II - - - - 89,000 - - 89,000 (I) 0 = ~ 8 t"a:I ~I w .\11 )tCl"l . 8-357 SCHEDULE "8" STAFF PROGRESS REPORT Property Division During the period July~, 1979, to September 30, 1979, the Property Division completed the acquisition of 9 new properties containing 58.809 acres. One new property was expropriated during the period. The total acreage of lands owned by the Authority, as of September 30, 1979, is 26,595.279 acres. The Property Division also carried out all of the routine admini- stration management required in connection with Authority-owned lands, i,e, agreement, easements, taxes, leases, rentals, insurance, etc. A breakdown of the properties and acreages acquired by the Authority to date is as follows: FLOOD CONTROL AND WATER CONSERVATION ETOBICOKE CREEK WATERSHED 2 - Properties settled during period containing 34.632 acres - 2 purchases Total to date--64 properties acquired containing 442.406 acres; - 2 expropriations outstanding MIMICO CREEK WATERSHED Total to date--23 properties acquired containing 75.475 acres; HUMBER RIVER WATERSHED 2 - Properties settled during period containing 18.187 acres - 2 purchases 1 - Property sale during period Total to date--727 properties acquired containing 8,376.304 acres; - 1 expropriation outstanding DON RIVER WATERSHED 2 - Properties settled during period containing 4.762 acres - 2 purchases 1 - Property expropriated during period containing 2.201 acres Total to date--160 properties acquired containing 1,793.004 acres; - 4 expropriations outstanding HIGHLAND CREEK WATERSHED 1 - Property sale Total to date--139 properties acquired containing 820.708 acres; ROUGE RIVER VALLEY WATERSHED 1 - Property settled during period containing .950 acres - 1 purchase Total to date--110 properties acquired containing 2,074.636 acres; DUFFIN'S CREEK WATERSHED 2 - Properties settled during period containing 0.278 acres - 2 purchases Total to date--79 properties acquired containing 886.147 acres; CONSERVATION AREAS - Albion Hills Conservation Area Total in Area--34 properties containing 1,044.142 acres; B-358 - 2 - - Black Creek Conservation Area Total in Area--7 properties containing 113.966 acres; - Bolton Community Conservation Area Total in Area--4 properties containing 18.043 acres; - Boyd Conservation Area Total in Area--12 properties containing 991.090 acres; - Bruce's Mill Conservation Area Total in Area--2 properties containing 267.038 acres; - Cedar Mill Property Total in Area--l property containing 0.337 acres; - Claireville Conservation Area Total in Area--l property containing 28.114 acres; - Claremont Conservation Area Total in Area--5 properties containing 396.750 acres; - Cold Creek Conservation Area Total in Area--6 properties containing 467.880 acres; - Frenchman's Bay Conservation Area Total in Area--9 properties containing 49.430 acres; - Glassco Park Total in Area--l property containing 482.000 acres; - Glen Haffy Conservation Area Total in Area--ll properties containing 802.206 acres; - Greenwood Conservation Area Total in Area--l4 properties contai~ing 680.648 acres; - Heart Lake Conservation Area Total in Area--8 properties containing 380.663 acres; - Humber Trails Conservation Area Total in Area--l property containing 48.664 acres; - Oakbank Community Pond Total in Area--l property containing 9.350 acres; - Petticoat Creek Conservation Area Total in Area--l property containing 177.918 acres; - Lake St. George Conservation Area Total in Area--l property containing 319.250 acres; - Tam O'Shanter Conservation Area 1 - Property sale during period Total in Area--l property containing 118.571 acres; B-359 - 3 - FOREST AND WILDLIFE AREAS - Gibson Lake Forest and Wildlife Area Total in Area--l property containing 137.160 acres; - Glen Major Forest and Wildlife Area Total in Area--lO properties containing 1,442.057 acres; - Goodwood Forest and Wildlife Area Total in Area--6 properties containing 307.639 acres; - King Creek Forest and Wildlife Area Total in Area--l property containing 0.185 acres; - Palgrave Forest and Wildlife Area Total in Area--7 properties containing 628.432 acres; - Peter Wright Forest and Wildlife Area Total in Area--l property containing 20.939 acres; AGREEMENT FOREST LANDS - Uxbridge Forest and Wildlife Area Total in Area--l property containing 93.000 acres; - Humber Forest Area. Total in Area--22 properties containing 1,803.165 acres; NIAGARA ESCARPMENT LANDS Total in Area--4 properties containing 251.926 acres; WATERFRONT PLAN - Project W.F.-l - Etobicoke Sector Total to date--6 properties acquired containing 68,616 acres; - Project W.F.-2 - Ashbridge's Bay Sector Total to date--l property acquired containing 29.618 acres; - Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete) Total to date--4 properties acquired containing 0.641 acres; - Project W.F.-3A - Pickering/Ajax Sector (Ext. No. 1) Total to date--149 properties acquired containing 491.013 acres; - Project W.F.-4 - Scarborough Sector Total to date--52 properties acquired containing 456.148 acres - 1 expropriation outstanding B-360 - 4 - SUMMARY FLOOD CONTROL AND WATER CONSERVATION July 1 to Sept. 30, 1979 - 9 properties settled containing 58.809 acres; - (9 purchases) - 1 property expropriated - 2 property sales Total to date--1,302 properties acquired containing 14,468.680 acres; - 7 expropriations outstanding; CONSERVATION AREAS July 1 to Sept. 30, 1979 - 1 property sale during period Total to date--120 properties acquired containing 6,396,060 acres; FOREST AND WILDLIFE AREAS July 1 to Sept. 30, 1979 - Total to date--26 properties acquired containi~g 2,536.412 acres; AGREEMENT FOREST LANDS July 1 to Sept. 30, 1979 - Total to date--23 properties acquired containing 1,896.165 acres; NIAGARA ESCARPMENT LANDS July 1 to Sept. 30, 1979 - Total to date--4 properties acquired containing 251.926 acres; WATERFRONT PLAN July 1 to Sept. 30, 1979 - Total to date--212 properties acquired containing 1,046.036 acres; - 1 expropriation outstanding; GRAND TOTAL OF ALL PROJECTS July 1 to Sept. 30, 1979 - 9 properties settled containing 58.809 acres: - (9 purchases) - 1 property expropriated during period; - 3 property sales Total to date--l,687 properties acquired containing 26,595.279 acres; - 8 expropriations outstanding. B-361 To: The Chairman and Members of the Executive Committee, M.T.R.C.A. Meeting #16/79 From: Mr. R. K. Cooper, Administrator, Historical Sites Division Re: Historical Sites Division Staff Progress Report July 1 to September 30, 1979 (1 ) PROGRAM (a) Registration and Artifacts From July 1st to September 30th, Black Creek received 22 donations comprising 192 items. Notable among the recent acquisitions are an 1858 candlewick bedspread, an iron pot and griddle, three early Ontario chairs and a lady's pocket pistol. From late May to August 25th the Registration Department was assisted by three students from Experience '79 Program 0705 through the Ministry of Culture and Recreation. With their assistance the cataloguing has been brought completely up to date, including the typing of classific- ation and location cards. All registration records up to the middle of 1979 have been microfilmed. The refitting of the Mackenzie Home basement has been completed and the textile collection has been moved to this location. Reorganization and inventory of other storage areas continue. (b) Publicity and Promotion Through the summer, Black Creek staff have organized several special displays promoting the Village. A six week display at Eaton's Yorkdale through August and September involved four display cases, two period room settings and picture display panels promoting Village acitivites year round. Displays involving broom-making demonstrations were also set up at Eaton's Centre and Eaton's Warehouse for Canada Day Celebrat- ions, and the Science Centre for its 10th birthday celebration. Black Creek also assisted Gibson House in North York, Century Village in Lang, the Milton Agricultural Museum, the Grange in Toronto, and Bolton Cider Tyme with loans of artifacts for special displays. Also staff and oxen participated in Doon Village Festival. At the C.N.E. this year Black Creek held a "What Is It?- competition in the Arts, Crafts and Hobbies Building, and the 1837 fire pumper was displayed at the Royal Insurance of Canada exhibit. Once again, Black Creek has been used as a location for commercial photography. C.F.T.O. "Kids' Korner" filmed some footage on candle mak- ing at Black Creek and also interviewed the candle-maker at the studio. Eaton's Yorkdale photographed several fashion layouts for use in their "Canada Month" campaign. Regal Toys used the Laskay Emporium as back- ground for a Christmas ad. Two cigarette companies and Pioneer Chain Saws photographed their products at Black Creek for newspaper or magazine ads. Ontario Hydro filmed early power sources for an educat- ional film on nuclear power. Imperial Oil used the site for pictures for their internal magazine; the cover of "Gallery", a new magazine for homemakers' was shot in Laskay Emporium and segments for a filmstrip on furniture making were shot at the Village Cabinet Maker's. Village staff have spoken to several groups including the Bolton Rotary, members of the Victorian Society of America, Southern Ontario Unit of the Herb Society of America, volunteers of Grange, Art Gallery of Ontario, Midland Historical Society and students of Seneca Historical Natural Interpretive Service Course. C.F.R.B. "Good News" interviewed Village staff for six programs on Black Creek and early crafts. Staff were also interviewed on C.K.Q.T. Oshawa for Gordon Grayson's Travel Show. Two programs on horses in pioneer times were recorded with James West. These programs will be heard on more than two dozen stations in Canada and the United States. Mr. Bradshaw continues to be very good in assisting the Village, and staff was interviewed on four different occasions during this period. B-362 - 2 - (c) Special Events Over the summer there were 29 weddings held in the Village and the Half Way House has hosted 31 receptions and banquets. Sunday evening, September 9th, the Village hosted a very successful outdoor Hymn Sing in the Valley, led by BishOp Read, Suffragan Bishop of Toronto, with participation by several Anglican Church choirs and the Etobicoke Temple Salvation Army Band. Over 500 people attended. The 23rd Annual Pioneer Festival was held on Saturday, September 15th. Over 7500 people attended and Village revenue from sales outlets showed substantial increases over 1978. The International Congress of Biochemists and Shoppers Drug Mart both held evening conventions at Black Creek, with attendance totalling over 4700. Late this summer the Medicine Wagon was put back in operation on week- ends, with a medicine show which included both magic tricks and the sale of "Black Creek Elixir". (d) Building Maintenance and Construction The Mennonite Meeting House Drive Shed, which came from Milton, was reconstructed by Village staff in time for use on Festival Day; there- by eliminating the need for renting two tents. The two portables in the lower parking lot have been completely repainted and the skirting has been completed around both buildings. Also the lumber storage building has been repainted. (e) Ground Maintenance and Development Repair and maintenance work has continued through the summer on all boardwalks and fences. A regular maintenance program has been carried out on the Peacock Woodlot. (f) Livestock A new calf was born in July and the Clydesdale mare produced the first purebred colt to be born at the Village, bringing the number of Village horses to eleven. (g) Staff One Village staff member has begun the second year of the Master Spinners' Course. Several members of staff attended a lecture on early Ontario furniture makers at Todmorden Mills arranged by the Metro Museums Committee. (2) FINANCIAL STATEMENT - January 1 to September 30, 1979 Total Budget Used Operations Appropriation Budget Variance % Expenditures $ 738,031 $ 889,000 $ 150,969 83 Revenue $ 648,588 $ 750,000 $ 101,412 86 Development Expenditures $ 20,374 $ 70,917 $ 50,543 28 (3) FINANCIAL COMMENTS (a) Operations and Maintenance Black Creek Pioneer Village As of September 30, 1979, total attendance at the Village was 221,040 as compared to 223,061 on the same date in 1978. Gate revenue is down approximately $5,000.00; however, sales outlets have shown a sub- stantial increase from $221,023.56 in 1978 to $263,062.93 in 1979. Village citizenships now number 423, including 27 life members. B-363 - 3 - The Dickson Hill School Program is fully booked for the fall season, and there is still a two year waiting list of teachers interested in participating. The government-sponsored Experience '79 program, which was completed in August, provided 19 students to assist in Village operations, 3 students in registration and 3 students on research. Research on the Sawyer's House, cheese-making and brewing in the 19th century was carried out. One student on a 16-week O.C.A.P. grant is presently assisting in the Costume Department. Several men from the House of Concord work on a daily basis at Black Creek and have provided extra labour for Village maintenance and in the production of toys. Also Mimico continues to provide manpower on week-ends. (b) Historical Sites Development The only building development underway at the present is the Sawyer's House. Work is progressing on the restoration of furnishings for this project and hydro is being installed, so that work on the completion of this building can begin immediately. The first instalment of funds from the Junior League has been received and the agreement with the League has been signed. B-364 CONSERVATION LAND ~ffiNAGE~mNT DIVISION PROGRESS REPORT JANUARY - SEPTEMBER, 1979 Conservation Services Authority Land Management Programs Forestry This summer a plantation management study was undertaken for Glen Haffy Conservation Area, Palarave Forest and Wildlifp. Arp.a and Gibson Lake. Plantations were inventoried and management plans are being developed. A program of woodlot and plantation management utilizing conservation area staff was carried out during the winter and will be re-activated this fall. Products from the management programs have been used for firewood sales and saw logs (6,000 board feet). Forty-eight thousand reforestation trees were planted on Authority lands, the majority at Gibson Lake and Glen Haffy Conservation Area. Boy Scout groups from York Region planted 20,000 trees at Claireville. This Fall, approximately 9,000 trees and shrubs will be planted at Glen Haffy, Claireville, Gibson Lake and Boyd Conservation Areas. Stream Improvement Stream improvement projects were carried out at the Kortright Centre for Conservation and the Humber Trails Conservation Area. Under the Special Stream Enhancement Project, stream improvement works have been carried out on Dutfin Creek in tne Claremont Conservation Area and the Greenwood Conservation Area. !-and Management To date, six applications for agricultural rental of Authority lands ha~e been assessed. Three assesments for Authority land acquisition were also carried out. This summer, biophysical inventories of Authority lands were carried out at Claireville, Greenwood and Boyd Conservation Areas. Under the Junior Conservationist Award Program, operated by the Conservation Authorities Branch of the Ministry of Natural Resources, students carried out a management inventory of the High Hills property located in the Glen Major Area. Inventories are used in preparing resource management plans for Authority lands. Private Land Management Programs Forestry Appriximately 5,959 deciduous trees and 12,994 shrubs have been planted on private lands. Under the Private Land Reforestation Program 146,000 trees were planted utilizing Conservation Area Staff. A total of 30 site visits have been made for the forestry program. Six tree spade rentals were carried out on private lands and & tree spade applications are on file. Stream Improvement Four stream improvement projects have been carried out this summer on private lands and stream improvement works under the Special Stream En- hancement Program are presently underway. These include fencing and buffer plantings along cold water streams. A stream assesment program was carried out on the head waters of the Humber River. Five site visits have been carried out for stream improvement. Land Use Planninq In June, a Conservation Services Field Day was held at palgrave Forest and wildlife Area with approximately 32 people attending. Four Conservation Plans have been completed and two remain on file. Twelve site visits have been carried out for private landowners regarding pond construction and aquatic weed control. Plant Propogation 8-365 Expansion of the nursery operation has been undertaken this year and has resulted in a 50% increase in production. Special Projects A landscape project was carried out at the Kortright Centre in preparation for the opening of the Centre held in June. A tree and shrub maintenance program was carried out this summer at the Humber Bay East Waterfront Project. Plantings are presently being carried out at the Petticoat Creek Conservation Area and are designed to rehabilitate those sections of the area disturbed by the York-Durham sewer line. This project is being funded by the Ministry of the Environment. Services staff will also be carrying out plantings for the Peel-York-Durham revegetation program and plantings on Metro Erosion sites. The rehabilitation of the Thackeray Landfill Site is scheduled for mid-October. This is a five year project funded by The Metropolitan Toronto Works Department, Conservation Areas Development The combination of the late Provincial approval of the development budget and the preparation of the Interim Conservation and Recreation Land Manage- ment Plan have delayed development projects. However, with the end of the summer season and the increased availability of operations staff all proposed development work should proceed quickly during the fall months. The fencing of a portion of the west boundary of the Heart Lake Conservation Area was begun in September with a completion date set for the third week of October. Materials were acquired for the construction of 90 steel frame picnic tables. All tables were constructed in the spring months and in use during the summer season at the Petticoat Creek Conservation Area. Footbridge construction initiated in September at the Greenwood Conservation Area will be completed in October. One footbridge will provide access to the day camp area replacing a temporary bridge while a second will provide access to the nature trail. The Albion Hills Campground Supervisor's Office/Residence is being constructed by Authority staff and additional labourers hired as required. The founda- tion work is scheduled for the third week of October and it is anticipated the b~ilding will be completed by the end of November. A contract has been awarded for the completion of the Bruce's Mill Foundation, Materials are being supplied by the Authority. Additional development work is being undertaken at the Cold Creek Ri fle Range to extend the back stop and to recontour the range surface to reduce the possibility of ricochets. Staff has worked closely with the Ontario Provincial Police to ensure user safety. Materials for this work have been approved and work will be completed during the Fall months. The initial layout of the model airplane field, and new parking lot has been finalized. In order to meet 1979 budget appropriations a pre-fabricated structure is under consideration for the Cold Creek Trap Control Building. The building will be erected by the end of November. A number of plans have been developed during the summer months for proposed works at the Claireville Area including landscape work at the beach area and a landscape plan for the Cold Creek Trap Range Control Building. These plans are required in 1900. Visitor Survey Throughout the summer months, the Visitor Survey has been carried out in all conservation areas. Surveys were distributed randomly to approximately 15\ of all groups entering conservation areas excluding day camp and group camps. Information on origin of visitors to the Indian Line Campground was collected separately. Students, during the summer months, distributed questionnaires and coded ........._ "..~~__,....C'!.oeo ~n,... "-'1"'\",1'"'\,1+-0,.. :::1I"~l '-Ie!.; c: 8-366 Over 7,000 of the 20,000 surveys were returned. This represents approximately a 35% rate of return which is considered good for a handout survey of this type. Operations During the winter, 8 conservation areas were open for winter activities with most staff time being involved in routine operations. The Albion Hills Ski Program operated at capacity while the Bruce's Mill Program ran below capacity. This latter situation is expected to improve as this program becomes better known. Questionnaires distributed to school and other participating groups indicated a very high level of satisfaction with the program facillties, content and ski staff. The improved ski trails at Palgrave, Cold Creek and Claremont were well used. This past ski season was shorter than previous years due to the lack of snow in early January. The preparation of the Conservation Areas for spring and summer activities proceeded on schedule. The Maple Syrup demonstration at Bruce's Mill was well attended with school groups and general public attendance up 900 and 2300 respectively over the 1978 program. On May 13, 1979, an Open House was held at the Claireville Conservation Area to launch the Authority's new canoe instruction and rental program. As part of the Visitor Services program a promotional brochure and flyer were circulated to schools, day camps, youth groups, and sports stores. Thirty- two groups attended day instructional sessions. Three weekend courses and two evening courses held were well attended by the general public. To date the weekend rental demand for the 16 canoes and 8 rowboats has been at or near capacity. The strong response to this program by both the general public, schools and organized groups resulted in a very successful summer program. There continued to be a very high demand for conservation area facilities by organized group picnics with a total of 609 reservations booked to the end of September. The excellent summer weather during late June and early July resulted in successive Sunday closing of most major use areas and maintained attendance at the record 1978 levels. During the summer, 24 Day Camp organizations made use of conservation area facilities for their programs. Again this year the Experience Program played an important role in helping maintain conservation areas. A total of 43 students were e~ ployed including 3 who conducted a visitor survey. Conservation area swimming facilities were extremely busy throughout the summer. The Petticoat Creek pool winterizing procedures were again suc- cessful and the pool opened on time. However, it was necessary to close the pool on a number of occasions during the summer due to mechanical breakdowns in the plumbing and filtering equipment. Repairs are being carried out this fall in co-operation with the Water Resource Division, Waterfront Section. An upstream sewage treatment plant spill on the east branch of the Humber resulted in the closing of the Boyd swimming area for a period of approximately 2 weeks in early August. This seriously affected the Boyd area attendance. Despite the excellent work performed by our lifeguard staff, there was, unfortunately, a drowning fatality this summer at the Claireville Conservation Area. During the summer, Conservation Area staff, in co-operation with the Property Division have completed property line fencing at Glen Major Forest and Wildlife Area. Similar projects are underway at Nashville Reservoir and Palgrave Area. In preparation for the winter season staff hiring has commenced along with minor alterations to ski trails. Attendance at the Indian Line Campground has been excellent with the camp- ground at or near capacity particularly during August. To date a total of 28 Special Passes distributed at the C.N.E. have been redeemed at Conser- vation Areas. To September 30, 1979, conservation area attendance decreased 69,553 or 6% for the same period in 1978. This is a result of a lack of snow during the early part of the winter and somewhat cool early Spring weather. Summer attendance is slightly ahead of 1978. The following table compares individual area attendance figures with the same period in 1978. Conservation Area Attendance to September 30, 1979 B-367 1979 197'8 Albion Hills 152,871 181,514 Boyd 152,414 182,242 Bruce's Mill 181,652 192,753 Claireville 100,764 92,807 Claremont 25,603 29,646 Cold Creek 29,626 35,828 Glen Haffy 57,474 50,852 Greenwood 55,552 50,403 Heart Lake 111,440 128,277 Humber Trails 4,173 3,740 Palgrave 5,898 -- Woodbridge 10,986 14,728 Petticoat Creek 98,707 92,017 Indian Line 48,960 42,866 1,036,120 1,105,673 Financial Statement - January - September 1979 Yr. to !:ate Total %Budget Forecast to Expend Comni t Approx. Budget Used Lee. 31/79 Q:ns. Areas revelop. 129 , 476 12,112 141,588 270,000 52 270,000 Cals. Areas cperat. 1,131,800 15,050 1,146,850 1,370,800 83 1,380,000 lent & utili ty Serv. 29,644 - 29,644 39 , 000 76 39 ,000 Private Land Program 122,559 1,920 124,479 113,000 110 113,000 Authori ty Land Program 48,392 - 48,392 95,000 51 95,000 Cons. Area R::!venIE 697,643 - 697,643 710,000 98 739,000 Private Land ~venIE 13,510 - 13,510 15,000 90 15,000 Financial Comments Private Land Programs presently indicate an over expenditure. Prior to year end, revenues forthcoming to the Plant Propogation Program will bring expenditures within Budget allocations. Authority Land Programs currently in progress will use alloted funds. Conservation Areas Development projects will be completed by year end with spending within budget allocations. Conservation Areas Operations budget is anticipated to be slightly overspent by year end. However, Conservation Areas Revenue will be over estimate resulting in a surplus in the Conservation Areas Program. Items previously deleted from the budget due to funding limitations will be proceeded with to the limit of excess funds. 79.10.17. 11p B-368 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMI~~EE, MTRCA, Mtg.116/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY l, 1979 TO SEPTEMBER 30, 1979 FLOOD CONTROL SECTION (1 ) MAINTENANCE WATER CONTROL STRUCTURES (a) PROGRESS Normal day to day maintenance was carried out on all the water control structures. The study of the Lower Humber Weirs and the fencing of the Brampton Diversion Channel have been completed. The major maintenance at the Goodwood Pumping Station involving clean out of the drainage canal and construction of a proper access road is in progress and should be completed by the end of October, 1979. (b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 Year , of Forecast To Date Total Budget to Expend . Conmi. t:Iren ts Approp. Budget Used Dee:. 31/79 $ $ $ $ '0 $ Maintenance 103,009.43 121,00 103,130.43 184,000,00 56 184,000.00 (c) FINANCIAL COMMENT The maintenance programme is on target and it is expected to expend this total budget this year. (2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS (a) PROGRESS There has been no change in this item since the last progress report except for the staff salaries and travel items, (b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp, Budget Used Dec. 31/79 $ $ $ $ , $ Te1emark 4,163.64 0 4,163.64 8,000.00 52 8,000.00 Gauges Radio 15,766.20 0 15,766.20 15,000.00 105 16,000.00 System Staff 50,777,40 0 50,777.40 65,800.00 77 65,800.00 Salaries Staff 1,096.06 0 1,096.06 3,700.00 29 3,700.00 Travel 71,803.30 0 71,803.30 92,5'"0.00 78 93,500.00 /2., . B-369 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg,116/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 2 (2) (c) FINANCIAL COMMENT Except for the small over-expenditure on the radio system, the remaining items are on target. (3) INTERIM PROJECT CAPITAL (a) PROGRESS The Flood Plain Acquisition Programme continued during this period and as well completed the acquisition programme within the Village of Stouffville for the proposed channel works. The various studies on the Flood Control Plan Review are continuing and it is expected that the Damage Center Analysis and the final plotting of the floodline on the Humber River will be completed by the end of October. (b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 Year Forecast To Date Total , of to Expend . Ccmni tnents Approp. Bu:1get Bu:1get Dec. 31/79 $ $ $ $ Used $ a Flood Plain 1,075,389.80 261,827.00 1,327,344.00 667,273.00 199 1,400,000.00 Aoquisition Headwater 147,275.59 0 147,275.59 200,000.00 73 200,000.00 Aoquisition Damage Center 19, 519 . 55 0 19,519.55 75,000,00 26 75,000.00 Analysis EnvironIrental 35,868.05 0 35,868.05 100,000.00 35 100,000.00 f.bU toring Flood Control 183,675.30 0 183,675.30 297,000.00 61 297,000.00 Plan Review Milne Dam 9,872.82 493.0 10,365.82 20,450.00 50 11,000.00 \tbrkshop 1,471,601.11 262,320.00 1,724,048.31 1,359,723.00 127 2,083,000.00 (c) FINANCIAL COMMENT Except for the acquisition budget, the remaining items are on target. /3. . , 8-370 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.116/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 3 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS Erosion Control and Slope Stabilization in Metro: ITEM LOCATION WATERSHED STATUS Major Remedial Work 6-14 Sulkara Court Don River completed Revegetation in the fall 19-45 Riverview Heights Humber River Completed 50-58 Stanwood Crescent Humber River Completed Enfield/Sunset/Jellicoe Ave. Etobicoke Completed Creek 10 Code co Court (Phase I) Don River In Progress Sweeney Drive Slope Don River In Progress Modification 35 Canyon Avenue Don River In Progress Minor Remedial Work Beechgrove Rd.-Phase II Highland Completed Creek 34 Restwell Crescent Don River Completed Revegetation in the fall Deanewood Crescent Vicinity Mimico Creek Completed Together with the foregoing, spring revegetation was carried out at 8 sites and maintenance work was carried out at 4 sites, Also preventative work was carried out at 31-35 Rivercove Drive and 8-14 Bruce Farm Drive as an interim measure, until permanent works can be carried out in 1980. /4. . . 8-371 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg..16/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 4 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS (Cont I d) Erosion Control and Slope Stabilization in the Regions of Peel, York and Durham REGION LOCATION WATERSHED STATUS Peel 138 King Street Vicinity Humber River Completed Bolton York 14th Avenue - Phase I Rouge River Completed Lots 5 & 6 Cone.8, Markham York 19th Avenue Rouge River Completed Lot 30, Cone.8, Markham York 7374 Kipling Avenue, Woodbridge Humber River Completed York 7440 Kipling Avenue, Woodbridge Humber River Completed York 8254 Pine Valley Drive Vicinity Humber River In Progress Woodbridge Durham 558 Pine Ridge Road Vicinity Rouge River Completed Pickering Durham Elizabeth Street, Ajax Duffin Creek Completed Reconstruction of Highland Creek 1979 was the third year of the three-year programme for remedial work within the Highland Creek. Work has been completed at the following sites. It is expected that all of the sites damaged by the storms in 1976 and 1977 will be repaired as contemplated under this project by the end of 1979. LOCATION STATUS Morningside Parks Yard Completed Scarborough College - Tennis Courts Completed South of Kingston Road Bridge Completed /5. . . B-372 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg.'16/79 FROM: Mr. M. R. Garrett, Administrator, Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 Page 5 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS (Cont I d) Engineering Studies: STOUFFVILLE CHANNEL: The contract has been awarded and approximately 30% of the works is completed. OAK RIDGES STUDY: The final report has been received for this study and a brief has been prepared for approval by the Authority and the Province of Ontario. (b) FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 Year % of Forecast To rate Total 8Ixiget to ExpeOO . Camri. tITents Afprop. 8lx1get Used Dee. 31/79 $ $ $ $ % $ W.C.-58 99,690.00 0 99,690.00 99,690.00 100 99,690.00 Erosion 398,621.77 38,658.00 437,279.77 800,000.00 54 800,000.00 Cattrol Metro Erosion 58,385.20 1,083.00 59,468.20 200,000.00 29 200,000.00 Control Peel,York & Durham Highla.OO 159,103.20 0 159,103.20 240,000,00 66 240,000.00 Creek Restoration Stouffville 54,507.30 9,000.00 63,507.30 395,000.00 16 550,000.00 Channel Wilket 0 0 0 10,000.00 0 10,000.00 Creek Oak Ridges 7,142.32 0 7,142.32 5,000.00 142 7,500.00 777,449.79 48,741.00 826,190.79 1,749,690.00 47 1,907,190.00 (c) FINAOCIAL cx::M-tENI' All of the items will be on target except for the Stouffville Channel construction which will be over-expensed due to the decision to carry out all of the works in 1979. 1979.10.16 JCM/fn 8-373 TO: THE CHAIro~N AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. - Meeting #16/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 6 The Authority is particularly concerned that additional funds be allocated for shoreline management and therefore, requested the support of the member municipalities in seeking supplementary funding from the Ministry of Natural Resources. Strong support has been received from Metro Toronto, the City of Toronto, Scarborough and Etobicoke. A meeting was held with the Minister, Mr. Auld and Mr. Godfrey to discuss this matter. Hopefully, the Supplementary Project funding will be available in 1980 and 1981. COLONEL SAMUEL BOIS SMITH PARK The response from the Hinister of the Environment concerning the application by the Authority for the approval of the Colonel Samuel Bois Smith master plan under the Environmental Assessment Act was recently received. It' is the recommendation of the Minister that: n (a) The environmental assessment be accepted: and (b) The undertaking as proposed be refused approval to proceed according to the provisions of section 14 of the Act." The Minister has also recommended that a Hearing be held before the Environmental Assessment Board. HUMBER BAY WEST The total area created as part of the Humber Bay West project is now 64 acres, The Master Plan shape has been achieved. The Humber Bay Boating Federation is having a very successful season. Approximately 460 boats are now moored at the site and the waiting list is growing rapidly. It is anticipated that the Federation will easily reach the design capacity of Humber Bay by next season and should be able to undertake the construction of some of the associated land based facilities. Discussions have been held with the Federation to finalize development priorities for 1980. The Preliminary Budget Estimates provide for interior shoreline stabilization, servicing and completion of grading. Design of these elements is underway and a final decision on the actual development program will be made pending the final budget allocation to be determined early in 1980. HUMBER BAY EAST A contract was awarded to M. A. Butt in the amount of $780,722.70 at Executive Committee Meeting #8/79 on June 13, 1979 for the construction of the park buildings, foot bridges and other site development features. Construction is nearing 50% completion and should be finished on schedule. The landscaping plans have also been prepared, but funds will not permit this work to be =ompleted in 1979. Final landscaping will be undertaken by the Conservation Land Management Division in the spring of 1980. The Authority staff is presently involved in the maintenance of existing plant material and grassed areas. The major development objectives in 1980 will be the completion of landscaping and the paving of the entrance road and parking areas. An Authority crew has substantially completed the liner of the pond system as well as piping for the pond water supply. B-374 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, <.. M.T.R.C.A. - Meeting #16/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 7 WESTERN BEACHES The Authority's involvement in this area is virtually complete pending a decision on additional funding for the waterfront development program. The Sunnyside Pavilion is continuing to deteriorate and since the Authority is unable to undertake the restoration of the building, the City of Toronto plans to refurbish the structure. BLUFFERS, PHASE II Fill volumes have increased in the last two months resulting in good progress being made towards the completion of the breakwater. Filling is presently concentrated along the breakwater between points 8 and 9. Federal funding of the project under the Small Craft Harbours Assistance Program is continuing. Armouring of Point 9 is complete. Stone has been purchased and stockpiled for armouring of Point 8 in 1980. The Bluffers Boating Federation has successfully installed approximately 110 mooring slips. Landfil1ing over the winter months will concentrate on completion of sufficient land base to allow for construction of approximately 140 slips in 1980. Discussions have been held with the Boating Federation to finalize development priorities for 1980. The preliminary budget estimates provide for interior shoreline stabilization, servicing and completion of the landfilling. The construction of the new launching ramps and day mooring docks is complete. The construction of the permanent parking lot associated with the day mooring docks, as well as the extension of the parking area associated with Phase I is also complete with line painting and landscaping around the lots to be finalized in the near future. Installation of permanent underground hydro service is scheduled to start November 5, 1979 with completion by December 1, 1979. EAST POINT Discussions are ongoing with the Authority's consultant, Hough Stansbury & Michalski Ltd. in an effort to finalize the Master Plan review and to prepare site plans in preparation for the construction to begin at this site upon completion of Bluffers Park. The Easterly Filtration Plant, presently under construction by Metro Toronto, is nearing completion and Authority staff is working closely with representatives of Metro Works Department to take the maximum advantage of the construction activities ongoing in the area. Considerable volumes of fill and top soil which were surplus from the ~letro Works site are available to the Authority for use in the construction of East Point Park. Since the East Point lands were used for storage of fill, materials, etc. during the construction of the Water Plant, the contractors are required to carry out certain works on Authority lands which will assist in the development of the park at no cost. ENVIRONMENTAL MONITORING The collection of field data on water quality, sediment quality, benthos and fish populations is nearing completion and extensive examination of bottom conditions in the area of East Point Park (by scuba diving) has been carried out by Authority staff and consultants. The work is being done as part of the Master Plan review, B-375 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. - Meeting #16/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JULY 1, 1979 TO SEPTEMBER 30, 1979 PAGE 8 Environmental Monitoring (Continued) The Ministries of the Environment and Natural Resources continue to raise concerns about the landfilling process. A technical committee has been recently established with representatives of the two Ministries and the Authority to review the impact of landfilling. Data collected in previous waterfront monitoring programs is extremely valuable in tlrisprocess. The final report is to be prepared by December. \ I SHORELINE MANAGEMENT Preparation of a detailed Master Plan in the Scarborough sector is ongoing. Provincial approval has been received to retain a consult:ant to examine certain soil mechanics and slope stability questions along the Scarborough Bluffs, aimed at producing recommendations on appropriate construction techniques to stabilize the Bluff face after the toe of the Bluffs has been protected. I Construction of an offshore revetment has been completed ~t Crescentwood Park. The work was done to protect the toe of the fill material.placed by the Borough of Scarborough last fall to save portions of CrescentwoodiRoad and underground services which were threatened. The work was carried out;by rented machines under the supervision of Authority staff. The next priority is the KingSbury-Harding area which was partially protected by a program of filling by the Borough of Scarborough over the summer. Although protection of the toe of the newly formed slope is required, staff feel that substantial settlement and slides are inevitable in this area and therefore it is not safe to work in that area at present. Therefore work will now be undertaken at the Eastern Beaches to stabilize the shoreline and provide for re-construction of the boardwalk. This work will be underway by November 1, 1979. txI I PlQ: 9 IN -.J FINANCIAL STATEMENT TO SEPTEMBER 30, 1979 0- Year to Date % of Budget Estimated Total Site Expenditures Commitments Total Approp. Budget Used Expend at Dec.31 Colonel Sam Smith 6,008.81 0 6,008.81 50,000.00 12 50,000.00 Humber Bay West 109,396.34 0 109,396.34 160,000.00 68 160,000.00 Humber Bay East 176,036.31 690,497.00 866,533.31 950,000.00 91 950,000.00 Western Beaches - - - 5,000.00 - 5,000.00 Ashbridge's Bay 6,409.65 500.00 6,909.65 5,000.00 138 8,000.00 Bluffers Park 400,069.09 174,167.00 574,236.00 740,000.00 77 760,000.00 East Point Park 9,448.31 - 9,448.31 20,000.00 47 28,000.00 Petticoat Creek 5,344.16 - 5,344.16 20,000.00 26 20,000.00 Studies & Monitoring 27,452.15 512.00 27,964.15 60,000.00 46 65,000.00 Salaries 41,310.35 - 41,310.35 50,000.00 82 50,000.00 Shoreline Management 84,155.94 - 84,155.94 500,000.00 16 304,000.00 Land Acquisition 339,848.97 700.00 340,548.97 240,000.00 141 400,000.00 PROGRAM TOTALS 1,205,480.08 866,3'76.00 2,071,856.08 2,800,000.00 73 2,800,000.00 =============================================================================================== Financial Comments: The Waterfront Development Budget is generally on target with some minor reallocations among activities being required. The major difference between the budget and the projected year end expenditures is in shoreline management. This decrepancy is due to several factors. The acquisition of an endangered house was charged to land acquisition rather than shoreline management. In addition, the work at Crescentwood Road was completed for approximately 20% less than budget. There was an allocation for maintenance dredging at Mimico Creek which could not be carried out because of environmental considerations and the filling operation at Kingsbury made it unsafe to proceed with the planned toe protection in that area. 1979.10.17 BED/md The Chairman and Members of the Executive Committee, M.T.R.C.A. B-377 TO: Meeting #16/79 - October 24, 1979 FROM: T. E. Barber, Administrator, Information & Education Division RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT -- January 1 - September 30, 1979 (a) INFORMATION The Authority's information work is carried out under the Community and Staff Relations Program, which is comprised of four components, namely Administration, Conservation and Recreation Land Management Plan, Water and Related Land Management Plan, and The Metropolitan Toronto and Region Conservation Foundation. Highlights Included: _ the production of 397,425 pieces of literature including: _ 200,000 copies of the four-colour general brochure; _ 138,000 copies of the four-colour Black Creek pioneer Village brochure; _ 10,000 copies of the 1979 Calendar of Events and Activities; _ 2,000 copies of the 1977-78 Biennial Report; _ 1,000 copies of the Meeting Facilities Brochure for the Kortright Centre for Conservation; _ 500 copies of the 1979 Directory; - 5,000 copies of the four-colour brochure for The Metropolitan Toronto and Region Conservation Foundation; _ 225 copies of the sixty-six-page catalogue for Foundation fund-raising; - 10,000 stick-on name tags; - 30,000 flyers and 700 posters produced and distributed for the 23rd Annual Pioneer Festival at Black Creek Pioneer Village; _ the distribution of 145,000 Authority brochures and 110,000 Black Creek Pioneer Village brochures; _ the completion of six special printing projects (26,200) for the Albion Hills Conservation Field Centre, the Kortright Centre for Conservation, the Soil Conservation Society of America, Kortright Sunday outings, Claireville Canoeing, and "Cabal" activities; _ the Authority is participating in Superguide (300,000) plus 300,000 copies of the Attractions with the Convention & Tourist Bureau of Metropolitan Toronto. Distribution is continuing; - news and photo releases, reflecting the Authority's and Foundation's activities, have been written and distributed to media and School Boards (total distributed - 40,200); _ samples of 1,425 press clippings, on all aspects of the Authority's activities, have been received; _ eight special photo and four special news releases were written for the Kortright Centre Official Opening (limited distribution) ; _ one hundred and thirty-seven colour television promos (one-minute) , on the Spring, Summer and Fall related activities of the Authority, have been distributed and are in use; _ one Authority exhibit was set-up and on display for Canada Heritage Week in the Scarborough Town Centre and another was set-up for the Claireville Dam Tour. As well, exhibit materials were supplied to Black Creek Pioneer Village staff for two displays; _ the production. and distribution of 1,500 copies of two issues of "Highlights" and 600 copies of one issue of "Inside"; _ twenty-one special photo assignments have been completed during this period; ... Ef- j 111 TO: Executive Committee, M.T.R.C.A.#16/79 - October 24, 1979 RE: Information and Education Division - Progress Report January 1 - September 30, 1979 Page 2 - three new one-minute colour public service films are now in progress (one for the Kortright Centre for Conservation, one for Flood Control and Water Conservation~ and one for The Metropolitan Toronto and Region Conservation Foundation); - various features continue to be sent to the media regarding the activities at the Kortright Centre for Conservation; - staff organized two Town Hall Meetings which were held at the Kortright Centre for Conservation on September 11th and 12th; - there are now new postage meter identification stamps, relating to Authority activities (e.g. Alert Your Ch~ldren of the Dangers of Spring Flooding; Black Creek Pioneer Village - open March 19 to December 30, 1979; Season's Greetings; Write for a Free Colour Brochure; Follow this Sign to the Conservation Areas; Managing Your Renewable Natural Resources); - invitations and programs were printed and arrangements were carried out for Arbor Day, ~~y 8th. One hundred and fifty people attended; - Authority presentations were made to the Oakville Kawanis Club, the Woodbridge Vaughan Rotary Club, Thornhill, and the Shriners' Club, Caledon; - two special press previews were planned and carried out at the Kortright Centre for Conservation on June 11th and 12th, to introduce the Centre for the members of the media; - staff arranged for the Official Opening of the Kortright Centre by The Honourable Robert Welch, Q.C., provincial Secretary for Justice and Deputy Premier of the Province of Ontario, on June 21st; - arrangements were made and invitations sent out for the Bill Davidson's Day Garden Party at Black Creek Pioneer Village, which was held on July 5th. Service recognition awards were presented as follows: Lifetime Passes to M. W. H. Biggar, Emil Kolb and Gordon Norton; and Gold Medallions to W. C. Davidson, Q.C., Case Bontje, Eileen Wigg and Frank McKechnie. Approximately 130 people attended; - a waterfront tour was arranged and carried out on July 9th for new Federal Members of Parliament; - Authority's participation at the Canadian National Exhibition, in "Metroshow", went well. Staff designed and built the exhibit and based the program on the theme of the 25th Anniversary of Hurricane Hazel and the resource management activities of the Authority since; - distribution of Authority brochures and Valley Regulations has been completed to all municipal offices and many government agencies in the watershed; - staff looked after invitations and R,S.V.P.'s for the Annual Sugaring Off Day, held at Bruce's Mill Conservation Area, on April 7th; - staff attends regular meetings of the Attractions Council of the Convention & Tourist Bureau of Metropolitan Toronto; - staff participated in a committee established to promote the Kleinburg and Town of Vaughan areas. It is expected that a program will get underway in the new year; - the first meeting of the Hurricane Hazel 25th Anniversary Planning Committee was held on September 17th and it was recommended that a Seminar be held on Wednesday, October 3rd in the Council Chambers, Toronto City Hall. . . . 3 8-:"379 TO: Executive Comm1ttee, M.T.R.C.A. #16/79 - October 24, 1979 RE: Information and Education Division - Progress Report January 1 - September 30, 1979 Page 3 (b) EDUCATION (i) Residential Field Centres - operating at about capacity; - accommodating the usual range of elementary and secondary level students and other community groups, such as girl guides and church groups; and specialized groups such as the Faculty of Forestry, University of Toronto, and a group from the University of Guelph studying land resource management; - the summer courses were very well attended. 64 students participated in the Archaeology credit course for senior secondary students at Boyd, the March of Dimes summer camp at Claremont provided a rewarding experience for 50 campers and 30 staff and there were 20 students who successfully completed the York University course in Conservation and Environmental Education (Geography 255) at Albion; - students from the Practice Teaching Programs at the Faculty of Educations of both the university of Toronto and Althouse College are going to participate in the Field Centres' Programs; as well, York University Faculty of Education has expressed an interest in having their students involved in the Field Centres' Programs. (ii) Lake St. George Conservation Field Centre Phase I of Lake St. George has been re-scheduled to begin October 29, 1979. All classes previously booked between September 4 and October 26, 1979 have been re-scheduled at a later date, either at Lake St. George or at Albion and Claremont. (iii) Kortright Centre for Conservation - of the five theme reports, three have now been completed, Fish and Wildlife, Forestry and Water. The Land Technical Review Committee will be meeting on October 25, 1979 at the Kortright Centre for Conservation, and the Energy Technical Review Committee will meet later this year. - the development of the outside area includes: - 80% completion of trails; - the wildlife pond to be completed by October 12; - the plans for the entrance are complete, with the first phase to be implemented within the next month; - the signage on Highway #400 and Major MacKenzie Drive is now in place. (iv) Black Creek Pioneer Village - a high interest by teachers and students and the continuation of the Practice Teaching Program for the Faculty of Education students from the University of Toronto; - the hosting of a number of teacher professional development days: - the Christmas program is completely booked. (c) FINANCIAL COMMENTS A. Operations and Maintenance - Community Relations Information and Education Operations All projects are meeting budget commitments, except the Lake St. George Conservation Field Centre and the Kortright Centre for Conservation. The delay of two months in the opening of the Lake St. George Conservation Field Centre has resulted in an estimated deficit of $6,000 which will be carried forward to 1980 Operations as per the agreement between the School Boards and the Authority. . . . 4 B-380 TO: Executive CommiLtp.~, ~LT.R.C.A. 116/79 - October 24, 1979 RE: Information and Education Division - Progress Report January 1 - September 30, 1979 Page 4 Staff chanqes and lowcr-than-anticipated revenues have resulted in a projected deficit at the Kortright Centre, which will result in an overall deficit of $9,187 in the Information and Education Operations. The staff s.s currently investigating ways and means of reducing costs and increasing revenue for the remainder of the year, in order to reduce the forecasted deficit . B, Water and Related Land Management - community Relations Program (lH 0 ) Expenditures under "Exhibits, Furnishings and Equipment - Kortright Centre" are considerably under the 1979 budget. These expenditures are based on cash-flow from the Foundation and not on annual budget allocation, and are limited by the approved project allocation of $233,319.00 "Lake St. George Develop~ent" reflects nearly $40,000 of expenditures chargeable to Stage II and will be incorporated into the Stage II approved project cost of $189,000. uConservation Information" and "Conservation Education" expenditures are in line with budget estimates. C. Conservation and Recreation Land Management -- Conservation Area Information and Interpretive Program (C3) Expenditures to the end of the year are forecasted to be in excess of budget by $1,700 as a result of over-spending on the Official Opening of the Kortright Centre for Conservation, the Garden Party and the Honour Ro.ll Awards Program. A, OPERATIONS AND MAINTENANCE - COMMUNITY RELATIONS Information and Education Expenditures Expenditures Expenditures Forecast to end 1979 Budget To-Date \ of Budget of 1979 $859,000 507,100 60\ 789,400 Revenue Revenue Revenue Forecast to end 1979 Budget To-Date \ of Budget of 1979 $757,700 439,900 56\ 663,800 B. WATER AND RELATED LAND MANAGE~1ENT - COMMUNITY RELATIONS PROGRAM (WI0) 1979 Expenditures Expenditures Forecast to Budget To-Date \ of Budget end of 1979 Albion Hills $ 7,000 4,600 65\ 7,000 J(CFC - Area Deve10~nt 76,000 55,800 73t 76,000 - Furnish. Exh. ,D:)uipnt 216,472 86,700 40\ 115,323 ISG - Developrent 171,722 210,700 123\ 171,722 $471,194 357,800 76% $370,045 Cbns. Infonnation 85,500 66,000 77' 85,500 Cons. alucation 153,500 122,800 80~ 153,500 $239,000 188,800 7~% 239,000 c. CONSERVATION AND RECREATION LAND MANAGF.MENT -- CONSERVATION AREA INFOR~~TION AND INTERPReTIVE PROGRAM CC3) 1979 Expenditures Expenditures Forecast to end Budqet To-Date , of Budget of 1979 S21.nnn 2n.,nn CHit. 22.700 B-381 TO: The Chairman and Members of the Executive Committee, M.T.R.C.A, Meeting #16/79 - Wednesday, October 24, 1979 FR: Guy Dudar - Administrator, Finance Division RE: STAFF PROGRESS REPORT - FINANCE DIVISION - #3/79 JANUARY 1, 1979 TO SEPTEUBER 30, 1979 ADMINISTRATION Financial Review Expenditures: 74% of the total budget has now been expended. At December 31. 1979 it is estimated that the budget will be overspent by approximately S3,OOO or .2%. Revenues: Only 56% of the total budget of $70,000 has been earned. At the present rate, it would appear that at December 31, 1979 there will be a short fall of $22,000. Net Expenditures: It is estimated that the Administration budget will be overspent by approximately $25,000 or 2%. GENERAL OPERATIONS Financial Review Expenditures: As at December 31, 1979, it is estimated that the budget of $112,000 will be underspent by $10,000 or 9$. This will be primarily due to interest income of approximately ~12,OOO reduced by cost increases in Office Maintenance expenditures. Revenues: BUdgeted revenues of $16,500 should be exceeded by approximately $10,000. Net Expenditures: It is estimated that at December 31, 1979 the net expenditure budget of $96,500 will be underspent by approximately $20,000 or 20%. SUMMARY Est. Position Surplus Budget at Dec. 31/79 (Deficit ) $ $ $ Administration 1,277,000 1,302,000 (25,OOO) General Operations 96,500 76,500 20,000 1,373,500 1,378,500 (5,000) :wr 1979.10.23. ~ B-382 , the metropolitan toronto and region conservation authority minutes Report #17/79 EXECUTIVE COMMITTEE WEDNESDAY-NOVEMBER-14-1979 U 7/79 -- ------ The Executive Committee met at the Kortright Centre for Conservation on Wednesday, November 14, 1979, commencing at 10:00 a.m. In the absence of the Chairman, Mrs. F. Gell chaired the meeting. PRESENT WERE Vice Chairman Mrs. F. Gell Members M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline Dr. T.H. Leith Mrs. S. Martin (For Mr. M.W.H. Biggar) F.R. Perkins J.S. Scott Authority Member Bal Vir Singh Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Property & Administration Division W.E. Jones Executive Secretary Mrs. K. Conron Research Planner, Planning & Policy Mrs. A.C. Deans Head, Waterfront Section, WRD D.E. Denney Development Co-ordinator, Planning & Policy J.W. l-ialetich Head, Flood Control Section, WRD J.C. Mather Senior Secretary, Planning & Policy Miss L. Trivelli ABSENT WERE Chairman R. Grant Henderson Members M.W.H. Biggar E.V. Kolb MINUTES The Minutes of Meeting #16/79 were presented. Res. #460A Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: The Minutes of Meeting #16/79, as presented, be adopted as if read. CARRIED; SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS ITS ADOPTION: 1. REPORT #3/79 - FLOOD CONTROL & WATER CONSERVATION ADVISORY BOARD Mr. Scott presented Report #3/79 of the Flood Control and Water Conservation Advisory Board. Res. #460B Moved by: Mrs. L. Hancey Seconded by: Dr. T.H, Leith B-383 -2- RESOLVED THAT: Report #3/79 of the Flood Control and Water Conservation Advisory Board be received and the brief "Channel Improvements on the East Humber River at Oak Ridges in the Town of Richmond Hill" be appended as Schedule "A" of these Minutes; and THE EXECUTIVE COMMITTEE RECO~~ENDS THAT: The Recommendations (a) , (b) and (c) , as set forth herein, be adopted: (a) The works outlined in the brief: "Channel Improvements on the East Humber River at Oak Ridges in the Town of Richmond Hill, dated September, 1979, be approved; (b) The Regional Municipality of York be requested to approve the work proposed in the brief; (c) The Regional Municipality of York be advised that, subject to the approvals required for the Interim Water and Related Land Management Project 1979-1981 being obtained, the Authority is prepared to proceed with the channel improvements on the East Humber River at Oak Ridges in the Town of Richmond Hill, as set out in the brief dated September 1979, on the basis of funding provided for these works in the Project. CARRIED; SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORr~TION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITErffi ADOPTED BY THE EXECUTIVE COMMITTEE: 2. APPOINTMENT OF AUTHORITY MEMBER -The Regional Municipality of Peel A communication was presented advising that Mrs.H. Dianne Sutter has been appointed to The Metropolitan Toronto and Region Conservation Authority to replace Alderman K. Coutlee. Res. #461 Moved by: C.F, Kline Seconded by: F.R. Perkins RESOLVED THAT: The communication received from Mr. L.E. Button, M.A., Regional Clerk, The Regional Municipality of Peel, regarding the appointment of Councillor D. Sutter as a member of the Authority, effective October 25, 1979, be received; and THAT Mrs. H. Dianne Sutter's name be added to the list of Authority members; and further THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mrs. H. Dianne Sutter be appointed a member of the Flood Control and Water Conservation Advisory Board and the Etobicoke-Mimico Advisory Board effective October 25, 1979; and THAT the Secretary-Treasurer be authorized to conduct a mail ballot of the members of the Authority to confirm the recommendation of the Executive Committee. CARRIED; 3. THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Appointment of New Member A communication was presented regarding the appointment of Mr. J.O. Elliott as a member of The Metropolitan Toronto and Region Conservation Foundation. Res. #462 Moved by: E.H. Card Seconded by: Dr. T.H. Leith RESOL VED THAT: The following recommendation of the members of The Metropolitan Toronto and Region Conservation Foundation - "THAT Mr. J.O. Elliott, President of Custom Concrete Limited, be invited to become a member of the Foundation." -be received; and ---- -3- B-384 THE EXECUTIVE COMMITTEE RECOMMENDS THAT Mr. J.O. Elliott, President of Custom Concrete Limited, be appointed a member of The Metropolitan Toronto and Region Conservation Foundation; and THAT the Secretary-Treasurer be authorized to conduct a mail ballot of the members of the Authority to confirm the recommendation of the Executive Committee. CARRIED; 4. 1979 CONSERVATION AUTHORITIES SENIOR TECHNICAL STAFF CONFERLNCE, m:CEMBER 2-5, 1979, OSHAWA, ONTARIO -Attendance at A staff communication was presented advising that Authority staff members have been asked to participate in the program for the above conference, at which a number of items will be of interest to the technical staff. Res. #463 Moved by: E.H. Card Seconded by: C.F. Kline RESOLVED THAT: Authority staff, as designated by the Secretary-Treasurer, be authorized to attend all or parts of the 1979 Conservation Authorities Senior Technical Staff Conference, Central Region, to be held in Oshawa, Ontario, December 2-5, 1979; and THAT their expenses in connection therewith, in the estimated amount of $600.00, be paid. CARRIED; 5. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation #79-46: Road Improvements A staff communication was presented advising that at Executive Committee Meeting #16/79, held October 24, 1979, the quotation of Gormley Sand and Gravel, for the supply and delivery of road gravel to th~ Lake St. George Conservation Field Centre, was accepted, it being the lowest quotation received. Between the time of submission of quotation and placing of order, Gormley Sand and Gravel increased its price to $3.50 a ton of granular "A" and $2.20 a ton of granular "B". Based on the tonnage of'~ranular "A" and granular "B" required, the lowest price would now be the pr;ice quoted by Lee Sand & Gravel Limited. ': Res. #464 Moved by: Dr. T.H. Leith Seconded by: M.J. Breen RESOLVED THAT: Resolution #456/79 (Executive Committee Meetipg #16/79, held October 24, 1979) be rescinded; and THAT the quotation of Lee Sand and Gravel Limited for the supply and delivery of road gravel to the Lake St. George Conservation Field Centfe, at $3.20 a ton of granular "A", and $2.20 a ton of granular "B", be accepted, it being the lowest quotation received. CARRIED; 6. ADMINISTRATION OF ONTARIO REGULATION 735/73 -July/August/September/October, 1979 The staff presented a report concerning the administration of Ontario Regulation 735/73 for the period July/August/September/October, 1979. Res. #465 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The report of the administration of Ontario Regulation 735/73 for the period July/August/September/October, 1979, as amended, be received and appended as Schedule "B" of these Minutes. CARRIED; B-385 -4- 7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Itr. William Tkachuk To add an existing gabion wall and to reshape rear yard area on east bank of the r-timico Creek at #156 Humbervale Boulevard, south of Bloor Street and east of Royal York Road, Borough of Etobicoke A staff communication was presented advising that an application has been received from Mr. William Tkachuk for permission to add to an existing gab ion wall and to reshape the rear yard at the above location. Res. #466 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Mr. William Tkachuk, be received; and THAT the application of Mr. William Tkachuk for permission to construct a gab ion wall and to place fill at #156 Humbervale Boulevard, Borough of Etobicoke (Mimico Creek watershed), be approved, subject to: (a) All work being carried out in accordance with drawings prepared by Erosion Control Gabions Limited and dated October 10, 1979; (b) Every effort being made to minimize silting of the creek during construction. CARRIED; 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Barsyd Investments Limited To regrade the lands at rear of John Duck I s Tavern and the Universal Motel, #2063 Lakeshore Boulevard West, Borough of Etobicoke (Humber River Watershed) A staff communication was presented advising that an application has been received from Barsyd Investments Limited to regrade the lands at the above location. Res. #467 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Barsyd Investments Limited, be received; and THAT the application of Barsyd Investments Limited to regrade the lands at the rear of John Duck's Tavern and the Universal Motor Hotel, located at #2063 Lakeshore Boulevard West, Borough of Etobicoke, be approved, subject to: (a) No fill being placed in the lake; (b) The Authority bei~g notified in advance of the proposed starting date for construction. CARRIED; 9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Heritage-Willow Limited To construct storm and sanitary sewer outfalls, pedestrian crossing and gabion protection along the Don River, Town of Richmond Hill A staff communication was presented advising that an application has been received from Heritage-Willow Limited for permission to construct a sanitary sewer outfall west of Kersey Drive and north of Weldrick Road in the Town of Richmond Hill. Res. #468 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Heritage-Willow Limited, be received; and THAT the application of Heritage-Willow Limited for permission to construct a storm and sanitary sewer outfall, a pedestrian crossing and gabion protection on Lot 43, Concession 1 and Lot 51, Registered Plan 2027, Don River watershed, be approved, subject to: -5- 8-386 (a) All work being done in accordance with Drawings Nos.l, 2, 3, 4, and 5, Project #E79.43, as prepared by Bryan Thomas & Associates Inc. , and dated July, 1979; (b) All gab ion works being preceded by a 6"-12" layer of crushed stone or gravel or a filter mat; (c) Every effort being made to minimize erosion and siltation along the watercourse during construction; (d) All disturbed areas being restored to the satisfaction of The Metropolitan Toronto and Region Conservation Authority and of the Town of Richmond Hill. CARRIED 1 10. APPLICATION FOR PERllIT UNDER ONTARIO REGULATION 735/73 West Woodbridge Investments To construct sanitary sewer and watermain crossing a tributary of the Humber River, north-east corner of Highways #7 a nd # 27 , Lots 6 & 7, Concession VIII, Town of Vaughan A staff communication was presented advising that an application has been received from West Woodbridge Investments for permission to undertake con- struction of a sanitary sewer and watermain crossing at the above location. Res. #469 Moved by: ~1rs . L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of West Woodbridge Investments, be received; and THAT the application of West Woodbridge Investments for permission to under- take construction of a sanitary sewer and watermain on Lots 6 and 7, Concession VIII (Humber River watershed) , be approved, subject to: (a) All areas disturbed due to construction being restored to the satisfaction of the Authority; (b) Every effort being made to minimize silting of the river during construction. CARRIED 1 11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Pickering To construct storm sewer outfall into the Petticoat Creek off Rosebank Road, Part Lot 30, Range 1, B.F.C. , Town of Pickering A staff communication was presented advising that an application has been received from the Town of Pickering for permission to construct a storm sewer outfall into the Petticoat Creek at the above location. Res. #470 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED TH1\T: The staff communication, together with the application of the Town of Pickering, be received; and THAT the application of the Town of Pickering for permission to construct a storm sewer outfall into the Petticoat Creek off Rosebank Road on Part of Lot 30, Range 1, Broken Front Concession, Town of Pickering, be approved, subject to: (a) All areas disturbed due to construction being restored to the satis- faction of the Authority; (b) Every effort being made to minimize the silting of the watercourse during construction; (c) All work being carried out in accordance with Drawing #8, Project 11419, as prepared by R. V.. Anderson Associates Limited and dated April, 1979, which forms part of the permit. CARRIED 1 B-387 -6- 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Hr.G.A. Gazarek To erect addition to existing car dealership at #1800 Kingston Road, Part Lot 18, Concession 1, Town of Pickering (Duffin Creek Watershed) A staff communication was presented advising that an application has been received from Mr. G.A. Gazarek of Sheridan Chevrolet-Oldsmobile for permission to erect an addition on the north side of the existing automobile dealership at the above location. Res. j/471 Moved by: HI's. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Mr. G.A. Gazarek of Sheridan Chevrolet-Oldsmobile, be received; and THAT the application of Mr. G.A. Gazarek for permission to erect an addition to an existing car dealership at #1800 Kingston Road, also known as Part Lot 18, Concession 1, Town of Pickering (Duffin Creek watershed) , be approved, subject to: (a) The proposed addition having a finished floor elevation of 83 metres; (b) All work being completed to the satisfaction of the Authority and of the Town of Pickering. CARRIED; 13. APPLICATION FOR PEm1IT UNDER ONTARIO REGULATION 735/73 Kingspoint Developments Limited To construct a building and re-grade portion of property, Part Lot 6, Concession I, E.H.S. , (Part Block 1, R.P. A-21) , City of Brampton (Etobicoke Creek Watershed) A staff communication was presented advising that an application has been received from Kingspoint Developments Limited for permission to construct a building and alter the existing contours at the above location. Res. #472 Moved by: Mrs. S. Martin Seconded by: J.S. Scott RESOLVED THAT: A Hearing be scheduled for consideration of the application of Kingspoint Developments Limited for a permit to construct a building and alter the existing contours on Part Lot 6, Concession I, E.H.S. (Part Block 1, R.P. A-21) , City of Brampton (Etobicoke Creek watershed) . CARRIED; 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Muriel Williams To place 6" drainage pipe, 50 metres in length, at the southerly limits of main golf course parking lot, Lot 10, Concession 5E., Town of Markham (Rouge River Watershed) A staff communication was presented advising that an application has been received from Muriel Williams for permission to add to the existing golf course drainage system at the above location. Res. #473 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Muriel williams, be received: and THAT the application of Muriel williams for permission to place a 6" drainage pipe and cover same with clean fill on Lot 10, Concession 5E., Town of Markham (Rouge River watershed) , be approved, subject to: (a) All work being carried out in accordance with the drawings submitted: (b) Every effort being made to minimize silting of the watercourse during construction. CARRIED; -7- B-388 15. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Property: Douglas Meharg and Mario Vettese Res. #474 Moved by: C.F. Kline Seconded by: F.R. Perkins RESOLVED THAT: The Report (October 25, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; "Re: Proj ect: Interim Water & Related Land Management Project 1979-1981 - Flood Plain and Valley Land Acquisition Component - Rouge River Watershed Authority: Executive Resolution No. 133, Meeting il4 - April 12, 1978 and Authority Resolution #51, Meeting #3 - April 21, 1978 Subject Property: West side of Highway #48, south of Highway #7 Owners: Douglas Meharg and Mario Vettese Area to be Acquired: 9.12 acres, more or less Recommended Purchase Price: $2,500.00 per acre (Le. $22,789.00) , plus Vendors' legal costs. "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lot 10, Concession VII, Town of Markham, The Regional Municipality of York located on the west side of Highway #48, south of Highway #7. "Negotiations have been conducted with the owners and their solicitor, Mr. J. Lachlan Cattanach, Q.C., of the legal firm Cattanach, Hindson, Sutton & Hall, 52 Main Street North, Markham, Ontario, L3P lX5; and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the sum of $2,500.00 per acre (Le., $22,789.00) , plus Vendors' legal costs, with the transaction to be completed by mid-1980. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 16. BOROUGH OF ETOBICOKE -Request for Permanent Easement, North of Rexdale Boulevard, West of Highway #27 A staff communication was presented advising that a request has been received from the Borough of Etobicoke to provide a permanent easement for a storm sewer required north of Rexdale Boulevard, west of Highway #27. The proposed easement affects Authority-owned land known as Part of Lot 34, Concession IV, Fronting the Humber, designated as Part 1 on Plan 64R-790l, Borough of Etobicoke, The Municipality of Metropolitan Toronto. Res. #475 Moved by: Dr. T.H. Leith Seconded by: E.H. Card RESOLVED THAT: A permanent easement be granted to the Borough of Etobicoke, required for construction of a storm sewer, north of Rexdale Boulevard, west of Highway #27. Said easement is shown as Part 1 on Plan 64R-7901. The Authority-owned land affected is Part of Lot 34, Concession IV, Fronting the Humber, Borough of Etobicoke, The Municipality of Metropolitan Toronto. Said easement to be granted for the nominal consideration of $2.00, subject to the Borough of Etobicoke being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and B-389 -8- BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 17. BOROUGH OF SCARBOROUGH -Request for Permanent E~sement, East of Midland Avenue, South of Undercliff Dr. A staff communication was presented advising that a request has been received from the Borough of Scarl~rough to provide a permanent easement for a storm sewer and outlet to St. Augustine Dropshaft, east of Midland Avenue, south of Undercliff Drive. The proposed easement affects Authority-owned land known as Part of Lots 334, 335, 336, 337, 338, 354, 355, 356, 357, 358, 369, 370, 371, 372, 373, 379, 380 and Part of Block "A" , Registered Plan 1566, Borough of Scarborough, The Municipality of Metropolitan Toronto. Res. #476 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A permanent easement be granted to the Borough of Scarborough required for construction of a storm sewer and outlet to St. Augustine Drop- shaft, east of Midland Avenue, south of Undercliff Drive. Said easement is shown as Parts 1, 2 and 3 on Plan 64R-7997. The Authority-owned land affetted is Part of Lots 334, 335, 336, 337, 338, 354, 355, 356, 357, 358, 369, 370, 371, 372, 373, 379, 380 and Part of Block "A" I Registered Plan 1566, Borough of Scarborough, The i'olunicipality of Metropolitan Toronto. Said easement to be granted for the nominal consideration of $2.00, subject to the Borough of Scarborough being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 18. CITY OF NORTH YORK -Request for Permanent Easement, South of Rowntree Mill Road, west of Islington Ave. A staff communication was presented advising that a request has been received from the City of North York for a storm sewer easement, south of Rowntree Mill Road, west of Islington Avenue. The proposed easement affects Authority-owned land known as Part of Lot 31, Registered Plan 2388, designated as Parts 1 and 2 of Plan 64R-7955, City of North York, The Municipality of Metropolitan Toronto. Res. #477 Hoved by: J.S. Scott Seconded by: Mrs. L. Hancey RESOLVED THAT: A permanent easement be granted to the City of North York for a storm sewer, south of Rowntree Mill Road, west of Islington Avenue. Said easement is shown as Parts land 2 of Plan 64R-7955. The Authority-owned land affected is Part of Lot 31, Registered Plan 2388, City of North York, The Municipality of Metropolitan Toronto. Said easement to be granted for the nominal consideration of $2.00, subject to the City of North York being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 19. BOROUGH OF SCARBOROUGH -Request for Permanent Easements, Military Trail west of Highcastle Road A staff communication was presented advising that a request has been received from the Borough of Scarborough to provide storm sewer and bridge maintenance easements required in connection with the widening of Military Trail west of Highcastle Road. -9- B-390 The proposed easements affect Authority-owned land known as Parts of Lot 15, Concession II, designated as Parts 3, 4, 7, 8, 11, 17, 18, 19, 20, 21, 22, 26, 27, 28 and 30 on Plan 64R-7987, Borough of Scarborough, The Municipality of Metropolitan Toronto. Res. #478 Moved by: Dr. T.H. Leith Seconded by: E.H. Card RESOLVED THAT: Permanent easements be granted to the Borough of Scarborough, required for construction of a storm sewer and bridge maintenance on Military Trail, west of Highcastle Road. Said easements are shown as Parts 3, 4, 7, 8, 11, 17, 18, 19, 20, 22, 26, 27, 28 and 30 on Plan 64R-7987. The Authority- owned land affected is Parts of Lot 15, Concession II, Borough of Scarborough, The Municipality of Metropolitan Toronto. Said easements are to be granted . for the nomi.nal consideration of $2.00, subject to the Borough of Scarborough being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 20. CITY OF BRAMPTON -Request for Conveyance of Authority-owned land: Gore Road A staff communication was presented advising that a request has been received from the City of Brampton for the conveyance of a small parcel of Authority- owned land required to facilitate access from the Gore Road to the Hilltop Gore Cemetery. Res. #479 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A small parcel of Authority-owned land, containing 0.090 acres, more or less, be conveyed to the City of Brampton, to facilitate access from the Gore Road to the Hilltop Gore Cemetery. Said land being Part of Lot 4, Concession IX, N.D., City of Brampton,. designated as Part 3 of Plan of Survey dated July 16, 1979, prepared by W.N. Wildman Limited. Consideration to be the nominal sum of $2.00, plus all legal and other costs involved in completing the transaction; and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20 (c) of The Conservation Authorities Act, R.S.O. 1970 Capter 78 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 21. BOROUGH OF SCARBOROUGH -Request for Conveyance of Authority-owned Land: Military Trail A staff communication was presented advising that a request has been received from the Borough of Scarborough for the conveyance of certain parcels of Authority-owned land required for the widening of Military Trail west of Highcastle Road. Res. #480 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Certain parcels of Authority-owned land, containing a total of 0.664 acres, more or less, be conveyed to the Borough of Scarborough for the widening of Military Trail west of Highcastle Road. Said land being Parts of Lot 15, Concession II, Bo~ugh of Scarborough, designated as Parts 2, 5, 6, 9, 10, 12, 13, 15, 23, 24, 25, 29 and 31, Plan 65R-7987. Consideration to be the nominal sum of $2.00, plus all legal, survey and other costs involved in completing the transaction; and THAT said conveyance be subject to an Order-in-Council being issued in accordance with Section 20 (c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended; B-39l -10- AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 22. WATERFRONT PLh~ - ETOBICOKE SECTOR COLONEL SAMUEL BOIS SMITH WATERFRONT AREA -Environmental Assessment A staff communication was presented advising that a preliminary review has been made by staff of the Review of the Environmental Assessment of the above- noted Waterfront Area. In his letter dated October 23, 1979, which accompanied the document, the Minister of the Environment recommended that a Hearing be held to resolve points of conflict and enable him to make a final decision in this matter. In order to properly prepare for the Hearing, considerable time is required by the staff and its consultants. Res. 11481 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority advise the Environmental Assessment Board that, due to other commitments, it will not be in a position to attend upon the Environmental Assessment Hearing Board regarding the Colonel Samuel Bois Smith Waterfront Area until after April 1, 1980. CARRIED; 23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: Erosion Control & Slope Stabilization in The Regional Municipality of Peel -Proposed Remedial Work: Rear of Nos.176-188 Mill Street, City of Brampton (Etobicoke Creek Watershed) A staff communication was presented advising that, as outlined in the staff report entitled "Erosion Control and Bank. stabilization in the Regions of Peel, York and Durham", which was approved by the Executive Committee at Meeting 1115/78, remedial work is proposed at the rear of Nos. 176-188 Mill Street, City of Brampton. Res. #482 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Erosion control work be carried out at the rear of Nos. 176- 188 Mill Street, Etobicoke Creek watershed, City of Brampton, at an estimated cost of $31,900.00; and THAT the approval of the Ministry of Natural Resources be requested; AND FURTHER THAT the benefiting property owners be required to contribute $2,800.00 towards the cost of the work. CARRIED; 24. HUMBER VALLEY ADVISORY BOARD -Report of Meeting of Members: Thursday, November 1, 1979 A report was presented advising that members of the Humber Valley Advisory Board toured the Roughland Pasture Research and Administration Area at the Elora Agricultural Research Station on Thursday, November 1, 1979. A short meeting of the members present was held following the tour. Res. #483 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Information and Education Advisory Board be requested to consider the establishment of a Land Use Demonstration at the Kortright Centre for Conservation to illustrate the application of the principles established at the Elora Agricultural Research Station which could be applied to the Headwaters area under the jurisdiction of The Metropolitan Toronto and Region Conservation Authority. CARRIED ; -11- B-392 Res. #484 Moved by: Mrs. J.A. Gardner Seconded by: Dr. T.H. Leith RESOLVED THAT: Professor J.E.E. Winch of the Department of Crop Science, Ontario Agricultural College, University of Guelph, be appointed a member of the Land Technical Review Committee - Kortright Centre for Conservation. CARRIED: NEW BUSINESS 25. MANAGEMENT STUDY REVIEW SUB-COMMITTEE -Report of Meeting #5/79 Res. lI485 Moved by: J.S. Scott Seconded by: Mrs. J.A. Gardner RESOLVED THAT: Consideration of Report #5/79 of the Management Study Review Sub-Committee be deferred to the next meeting of the Executive Committee scheduled to be held December 5, 1979. CARRIElJ; 26. KEATING CHANNEL -Dredging A staff communication was presented having regard to the proposal received from the Toronto Harbour Commissioners (November 1, 1979) to continue construction of the dredgeate endikement at the above location over the winter months of 1979/1980. Res. lI4 86 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority appropriation for the Keating Channel dredging in 1980 be increased to $200,000.00, subject to the approval and increased funding allocation of The Municipality of Metropolitan Toronto and the Province of Ontario. CARRIED; 27. CANADIAN NATIONAL RAILWAY LINE, BURLINGTON TO BARRIE Res. 1I4 87 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOL VED THAT: The Halton Region, Credit Valley and The Nottawasaga Valley Conservation Authorities, be requested to investigate, in conjunction with The Metropolitan Toronto and Region Conservation Authority, the availability of the Canadian National Railway right-of-way extending from Burlington to Barrie, to determine the feasibility of said Authorities jointly acquiring the right-Of-way from the Canadian National Railways for development of a recreation trail. CARRIED; 28. SCHEDULING OF MEETINGS -Author i ty, Executive Committee, Functional & Watershed Advisory Boards MRS. GELL requested that future meetings of the full Authority, Executive Committee and first meetings of the year only of the functional and watershed advisory boards, be scheduled and printed in the Authority directory. Subsequent meetings of the functional and watershed advisory boards to be as required and at the call of the Chair. 29. ADJOURNMENT On Motion, the Meeting adjourned at 12:00 a.m. Mrs. F. Gell, Vice Chairman K.G. Higgs Acting Chairman Secretary-Treasurer B-393 SCHEDULE "A" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY A BRIEF ON .CHANNEL IMPROVEMENTS ON THE EAST HUMBER RIVER AT OAK RIDGES" IN THE TOWN OF RICHMOND HILL AS PROPOSED IN THE INTERIM WATER AND RELATED LAND MANAGEMENT PROJECT 1979-1981 SEPTEMBER, 1979 B-394 CONTENTS OF BRIEF I. DETAILS (a) Purpose (b) Location and Description (c) Property Acquisition (d) Costs (e) Financing B-395 1. DETAILS (a) Purpose The purpose or these works is to enable the Metropolitan Toronto and Region Conservation Authority to ~mplement channel improvements on the East Branch of the Humber River at Oak Ridges in the Town of R~chmond Hill. Completion of this work will offer flood protection for this commun~ty to the 1:100 yr. flood and el~minate a recurrent flooding problem. B-396 I. DETAILS (b) Location and Description The East Branch ot the Humber River flows through the area known as Oak Ridges as shown on F1gure 1 and the work proposed will involve that portion of the Humber River lying between Schomberg Road and a p01nt approximately 600 meters upstream of Bathurst Street as shown on Figure 2. This area, originally located w1thin the Township of King, became part of the Town of R1chmond Hill 1n the Regional Municipality of York under regional government restructuring in 1971. The Oak R1dges area nas been the source of concern for some time due to recurrent flooding. The area is characterized by poor drainage and this comb1ned with flat channel gradients, low streambanks, and local channel constr1ctions are largely responsible for the flooding condit1ons. Rectificat10n of this problem was first studied in 1968 by The Metropolitan Toronto and Region Conservation Authority. The channel improvements proposed at that time were not carried out due to budget limitations. The flooding however has continued to be of concern to the local res1dents and the Town of Richmond Hill and after several minor attempts on behalf of the Authority to provide some relief without much success, the Authority through discussions with the Town of Richmond Hill agreed to review the situation. Due to the long t1me lapse since the 1969 study and the high cost of the recommended solution, the Authority felt that it was necessary to re-evaluate the problem and to look at alternate remedial measures. Therefore 1n 1978 a review of the flooding problem in the Oax Ridges area was undertaken. A review of the hydrology was undertaken first to verify the design flows and to allow for the increased development in the watershed and channel 1mprovements being carried out by the Town of Richmond Hill upstream of the study area. Flows for the 1 in 5 yr, 25 yr, 100 yr floods as well as the Regional Storm were generated and these were translated 1nto flood elevat10ns throughout the study area. 0 8 ... ~ . >' It . ~ OJ .. Z .. >! ., .. .. .. ,., co RICHMOND HILL OJ ! .I ., OJ OJ OJ .. " .. '" Q MAPLE MAJOR MACKENZIE ORIVE tV CHANNEL IMPROVEMENTS ON THE EAST HUMBER RIVER AT OAK RIDGES IN THE TOWN OF RICHMOND HILL SEPrEMBER, 1979 FIGURE 1 8-398 I, DETAILS (b) Location and Description (Cont'd) Once the floodlines had been plotted, the extent of flooding under each design floOd could be determined. ThJ.s then enabled the computation of antJ.cipated flood damages associated with the various return period floods. The costs ot the various alternative solutJ.ons could then be compared to the anticipated damages and the economJ.c feasJ.bility of each solution could be determined. From thJ.s analysis, it was shown that a total of 53 buildings would be flooded under the Regional Storm between Yonge Street and Bathurst Street. The 1:100 yr, 1:25 yr, and 1:5 yr floods affected a total of 27, 19 and 9 buildings respectively. The damages associated with the flooding ranged from $210,000 for the Regional Storm to $91,000, ~38,000 and $19,000 for the 1:100 yr, 1:25 yr and 1:5 yr floods. The recommended solution (Figure 2 ) chosen after carrying out the cost benefit analysis provides protection to all structures to the 1:100 yr flood and J.S comprised of channel J.mprovements downstream of Parker Avenue, sJ.lt removal at Schomberg Road culvert and replacement of the Parker Avenue culvert. This aiternative not only meets the flood protection requirements but also ensures the retention of the marsh areas which are important from the residents point of view as well as being envJ.ronmentaily desirable. In discussions with the Town of Richmond Hill regarding this recommended solution, it was determined that the Town would be replacing the Parker Avenue culvert in order to service future development to the north and therefore the Town of RJ.chmond Hill would bear the complete cost of replacing the culvert. As a result, the Parker Avenue replacement was removed from this project. Since one of the main objectives of this study was to develop a solution which would maintain the marsh, any solution proposed had to respect the natural stream grades through the marsh area. Therefore, it is expected that siltation of the natural stream channel and culverts will continue. In order to ensure the continued efficient operation of the works, the Authority intends to monitor the situation and when necessary would carry out on an ongoing basis under its maintenance program, silt removal within the stream channel. The Authority would also advise the Town of Richmond Hill of the condition of their culverts in the area in order that the Town could carry out a similar silt removal program in conjunction with the Authority. . 0 . . O' . t... 0 . 0 . . ~ . tz:' I W \D '0.. 0' .'(..0.0 ...~~ \D \ . (-:-. ,o~ \?~ I C:O> ~-/ .... CO ..,..... "'" '1~ -' , . :,.c'. ~ ~'l '; ~. _. - \..-- -- \ 1-- ... ."... ... ..".. "'-'~-'\:( . 0 0 " . .'. . ___ c;::l .0 . .. 0- - ..~ n ... .~., .. 4'- o - '~cf - ~ ,- -. 0 .:: ::---.~ 'I j ,7 , ~:, .~ ~ ~ .-.." ~- , /' ~' ,,-- -I -;::. .-.. . I '/ - '\~ -. .~ q" -,'~ c.;. '~OO~(~,,,,;;o;,,-t\ " ~~ ''1,\'\oO\::> ..... .., 00, ~ \Cj, _ .-' .~. --- --j-<~ ./"-' - ," . .-""I \\ CULVERT TO BE REPLACEO~OO,.-___~(\~OO 0" ..oets O. . ~ -,\", .' -r- .....- / _.~. "'-""'" ";;._ ...(" ,n : '\','" _ ;::f'::-:-" ' ~. \~''''~Co \) BY TowN OF RICH"O"O HILL [)QOO SCHOMBERG RO I? 0 ,~ 'II ~ .. "'.. ..:/.- -""- tJ rO . ~ ''''.uu, CULvERT S'LT PE>ALVAL 0 /j\J -." - '~... ~.__ .. \J \\00 ~ V..~ { S. \)00 )1 0 "'!c;':';'~ . . ".-,. <l' 1 ,0 ,~. 0 L- ""q" ,..,00 ....' \) , . ,,0 ..6". , . ' c.. .."" 'i>::J C'I"? _ . -I" ,.p-- - \\ .. . .__) GO ~~~ rn " <i>--?C? "..... ~~~ '/ 00 " ~ . \ ,', /:. -,' '~ cw~' l?~ G"O~~, OOCJ'0 ,..,,'~ .. ~~::-.. ,'" ~\l""~' ,~;-oo()o()C>' tJ: '" -_. \;~...... ' >tJ'l'\-~ \'~)~"'!:.I. , <:l ';:?~" , CO '" 0 '0.. M .'C..OeO .'u. ......r -........ J ...."' _.-'~' 00 .__ . ~__ _ _.)' ~Q.9~ _____ ^ c;:) G ...... to. .-~ \1 . " .";),~ 06 \;) ~ ,/ ~,,~ :' " - - ,,;;....-- . 'Soo-0 .. \ [,'$ '/ C:> . o~ \\ -..--- ... \ (4.-..,(} ~-:-~ .)...' ('.... . 0 \\ ~,.,.--- ~- -\.-........ ~.. (k1:'0C,)~/, "~"JP, -, .;. --......:.'---. . 0 c::::> ' , J .. -, d.. .yl...) J' l.) U . - ~ I II / C'~' <5 .~ Q~:;pDVoC" I)~~~~~~~~ Go c. ':~'- ..t:'=" ' I .-<0 rJ ""~\-~" ,.,.- .' 0000 ,c;:~ (l . '. ",,'\1 <J ~.:;/"\ c::J CJ CJ y..... . 0 0 'l \'._Zi ' 0 'n,:"- U- . . ........~ :--V,?' . ,)ll. . 'o<3'fl)- . "~-o~Q'. ""S:-'iS' .' B (? c? 0 . C S -, <' 'D ~.'n 0\)1.)" ~H(, Slot " C\ ,t ~,~_.....,.- \.... . \.1 \-? - ( " \~ \) 0" \;1>" ~ ~ \\ 0'\\ ?\)O 0c~..r. \/0 ,.,1 '~ ',-li.'"jl ~ \j bOo a 0 ()\)b.o\:\ "" P ,."\ c.... .'OGo. c \' D ..\W 0 \) .' ,j) ., ~ 0 c.. ~ ~I '... ., ."'_ ".. ~4ll.. the metropolitan toronto and region J 14'" J ,,'- conservation authority , 5 Shc.ehom' D"ve Dc"n,y,..., Ont]"o M ~N I S4 TYPICAL SECTION AUGNMENT OF PROPOSEO CHANNEL --- PrOlcct CH^r~NEL IMfl<OVEME.f-JTS. E""S r I lUMbER kIV[f~ PROPOSED CHANNEL AT Ct.!': RIDGES 1'''011 0 +155 TO ,+ In) Locof<on Lot 68, Con I 10 Wendy Way In the towr -.:f !='Ichrr.or.d HILL at Oak J;.1r1qe~ Dote SEPT / 79 Scale I~ U 100 200 ~'ETFiES Job N! r-u Orwl.J N~- "" .~ B-400 I. DETAILS (c) Property Acquisition Properties required for these works are included in the Metropolitan Toronto and Region Conservation Authority's Master Plan for the Acqu~sition of Flood Plain and Conservation Lands, and as a result, will be acquired under that program and will not form part of this project. 8-401 I. DETAILS (d) ~ (1 ) Channelization $75,000.00 ( 2) Schomberg Road 20,000.00 ( 3) Engineering & Cont1ngencies 13,000.00 TOTAL $108,000.00 B-402 I, DETAILS (d) Financ~ng (1) Funding Funding for these works is covered within the overall financing provided under the Inter~m Water and Related Land Management Project 1979-1981. (2) Costs Total Cost of Works $108,000.00 Authority Share 48,600.00 Province of Ontario 59,400,00 (3) Benefiting Municipality The Regional Municipality of York has been designated the benefiting municipality and is to be levied the Authority's share in the amount of $48,600.00. Page I tIlc:l 'ro: Executive Cremi.ttee, M.T.R.C.A., #17/79 (')1 ::::.:. Administration of Ontario Regulation 735/73 - July, August, September and October, 1979. t<:lo RE: oW c: to< LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN t<:l c:l City of Brarrpton V-256, eM Consultants Ltd., _ New top of bank established as per site and office = Lot 7, Con. 1 EHS (Bnu10 Pen) rreetings. Southeast of Vcxiden and Main Streets July 4, 1979 .- They will watch over their CMI1 activities and correct End of William Street when necessary. Etobicoke Creek Watershed - Site \.ill be inspected on a ~kly basis. Ci ty of Branpton V-257 , Annbro Construction Ltd., - See above. Lot 7, Con. 1 EHS July 4, 1979 Southeast of vodden and Main Streets End of William Street Etobicoke Creek Watershed City of Branpton V-25B, Ibddy Pollard Haulage - See above. Lot 7, Con. 1 EHS July 4, 1979 Southeast of vodden and Main Streets End of \-lilliam Street Etobicoke Creek Watershed Town. of Richrrond Hill V-259, teredi.th Dev. Ltd., _ ONnership changed prior to violation taking place. Lot 43, Con. 1, R.P. 2027 c/o Parkway Hotels Inc., - See Heritage-Willow Estates. ~lest side of Kersey Crescent July 9, 1979 bet\Veen Yonge and Bathurst Streets [bn River watershed Town. of Richrrond Hill V-260, Luigi Parravarx> - Structures have been rerroved. Pt. Lot 43, Con. 1, R.P. 2027 July 9, 1979 !ear of Kersey Crescent, west of Yonge St. East of Bathurst Street [bn River Watershed 1979.11.07 /It Page' II TO: Executive Catmittee, M.T.R.C.A., #17/79 RE: Administration of Ontario Regulation 735/73 - July, August, September and October, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN TOwn of Richmond Hill V-261, Dr. [On Carlson - Have graded area to our satisfaction and will seed pt. Lot 66, R.P. 2027 July 11, 1979 in spring. N/W intersection of Penberton Road and WalIrer Road [On River Watershed Town of Vaughan V-262, Nick Novakovic - Filling stopped and area cleaned up. Lot 17, Con. 8 July 12, 1979 ~st side of Hwy. 27 North of Rutherford Road North side of Esse Service Station Htlrrber River Watershed City of Hississauga V-263, Rmnyrrede Dev. Corp. Ltd., _ Have asked that Warren Bitulithic restore the area Pt. Lot 1 SOS, Con. 1 July 31, 1979 to our satisfaction. South of Dundas Street East at the dead end of Mattawa Avenue Behind 1960 Mattawa Avenue Etobicoke Creek Watershed City of Hississauga V-264, Warren Bitulithic Ltd., _ Have apologized to Ml'OCA and Runnyrrede Dev. Corp. pt. Lot 1 SOS, Con. 1 July 31, 1979 Ltd., South of Dundas Street East - Have agreed to restore area. at the dead end of Mattawa Avenue Behind 1960 Mattawa Avenue Etobicoke Creek Watershed Town of Richrrond Hill V-265, Mr. & Mrs. weilekes _ Given an extension of tiTre as they may carry out Lot 1, R.P. 1960 August 3, 1979 landscaping on subject property. At dead end of Birch Avenue \-est of Avenue Road, East of Bathurst St. South of Carrville Road Don River Watershed 1979.11. 07 /It tll I 01>0 0 01>0 Page III lXl ro: Executive Ca:mittee, M. T .R.C.A. , #17/79 I ,t. Ac:"r.i.nistration of Ontario Regulation 0 RE: 735/73 - July, August, Septmber and October, 1979. V1 LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Borough of York V-266, Mr. Luigi Calabro - Fill rerroved fran site. Northeast quadrant of Eglinton Avenue August 14, 1979 - No further action necessary. at Jane Street Hurrber River \'latershed City of Mississauga V-267, Direct Systems - Pulled fill back to an agreed-upon location. Block 'A', 'E', R.P. 904 August 23, 1979 - Seeded slope and other disturbed areas. East of Seoond Line, \'2st of t-1aingate Dr. North of Eglinton Avenue off the cul-de- sac of Haultain Court Etobiooke Creek Watershed City of Mississauga V-268, Focal properties Ltd., - See above. Block 'A', 'E', R.P. 904 August 23, 1979 East of Seoond Line, \-est of Maingate Dr. North of Eglinton Avenue off the cul-de- sac of Haultain Court Etobiooke Creek Watershed City of t-tississauga V-269, Stacey Const. Ltd., - See above. Block' A', 'E', R.P. 904 August 23, 1979 East of Second Line, ~st of Naingate Dr. North of Eglinton Avenue off the cul-de sac of Haultain Court Etobiooke Creek Watershed City of russissauga V-270, Runble Contracting Ltd., - See above. Block 'A', 'E', R.P. 904 August 23, 1979 East of Seoond Line, ~st of Maingate Dr. North of Eglinton Avenue off the cul-de sac of Haultain Court Etobiooke creek \'latershed 1979.11. 07 lit Page IV TO: Executive Carmittee, M.T.R.C.A., #17/79 RE: Administration of Ontario Regulation 735/73 - July, August, SeptelTber and October, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN . Town of Richrrond Hill V-271, Heritage-Willow Estates - Ieroved fill. Lot 51, Block 'B', COn. 1 WYS, R.P. 2027 August 24, 1979 - Graded site. across from ~st end of Yongehurst M., - Erected fence. ~1est of Kersey Crescent between Yonge - Are getting signs posted and Bathurst Streets [On River Watershed Town of Vaughan V-272, Mr. Giuseppe Cappelletto - Fill rerroved and area reshaped to the satisfaction Lot 5, COncession 7, R.P. 64R-2630 September 4, 1979 of the staff. South of Hwy. #7, D:!ad end of Wallace St. Humber River Ivatershed Town of Caledon V-273, Luigi and Francesco - Dumping stopped. (" Lot 4, COn. 4 Stellato - Sone fill rerroved. North of Wild field Road, South of September 6, 1979 - Will act further \.men Hurrber flcx:xlline mapping is 5th Sideroad, East of 4th Line complete for this area. Humber River Watershed Town of Caledon V-274, Super Disposal Services - See above. Lot 4, COn. 4 September 6, 1979 North of Wild field Road, South of 5th Sideroad, East of 4th Line Humber River Watershed . Borough of Etobicoke V-275, Luigi Russignan - Area restored. rest side of R::>yal York Road September 13, 1979 - Final seeding or sodding remains to be done. South of Eg1inton Avenue Hurrber River Watershed 1979.11. 07 11t OJ I .co 0 0'1 Page V tIl TO: Executive carmittee, t-1.T.R.C.A., 111/79 I ,I>. Administration of Ontario Regulation 735/73 - 0 RE: July, August, SepteJlber and October, 1979. -..J LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN Borough of Etobicoke V-276, r-Enmi Excavating - See previous violation (V-275) ~st side of )byal .York Ibad~ September 13, 1979 South of Eglinton Avenue Hurrber River \'latershed To.-m. of Richrrond Hill V-277, Antonietta pacitto - Stopped dtmping at present. Lot 96, Con. 1 WYS, R.P. 1923 September 25, 1979 - ~'laiting for pennit application to be sul:mitted. North side of \~ldrick Read East of Walrrer lbad between Bathurst and Yonge Streets Don River \'la tershed City of North York V-278, volturno Excavating Co., - See following violation (V-279) Lots 28 and 29, R.P. 2069 September 280,\ 1979 East side of Bathurst Street IJ, blocks north of Sheppard Avenue Don River \'latershed City of North York V-279, Cadillac-Fairview (brp. - Cadillac has agreed to restore the area and no Lots 28 ~~d 29, R.P. 2069 September 28, 1979 further filling has taken place. East side of Bathurst Street l~ Blocks north of Sheppard Avenue Don River Watershed Town of Pickering V-280, William Ryan Glthrie AND - Wanring notice retumed unclairred. Lot 154, R.P. 816 Debra Marie Waslak - Property ownership has changed hands. Rear of 1406 Old FOrest Road Septerrber 28, 1979 - FOllow-up underway. East bank of Petticoat Creek North of Hwy. #2 Petticoat Creek Watershed . 1979.11.07 /It Page VI TO: Executive Ccrnnittee, M.T.R.C.A., #17/79 RE: ACministration of Ontario Regulation 735/73 - July, August, Septerrber and October, 1979. LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN T<:Ywn of Markham V-28l, Unionville Fairways Ltd., - Permit applied for. Lot 10, Con. 5E c/o Muriel Williams - Verbal permission given for serre restorative work South of Hwy. #7 October 1, 1979 to be carried out. West of Kennedy FDad FDuge River Watershed Borough of Etobiooke V-282, Mr. William Tkachuk. - O.vner has applied for a permit and staff has !ear of 156 Humbervale Blvd., October 5, 1979 recanrrended the issuance of sane. South of Glenroy Avenue - W:)rk to be oorrpleted before November 30, 1979. Mimioo Creek Watershed . Borough of Etobiooke V-283, Gabion Erosion Control - See above. . Fear of 156 Humbervale Blvd., October 5, 1979 South of Glenroy Avenue Mimico Creek \'latershed T<:Ywn of Ajax V-284 , Blue Maple Holdings - Unclairred at address registered by Ajax assessrrent. South pt. Lot 5, Range 3 October 12, 1979 West of Shoal Foad North of Range Line FDad Carruthers Creek Watershed T<:Ywn of Ajax V-285, Blue f-Iaple Holdings - !eceipt acknowledged through agent. South pt. Lot 5, Range 3 October 19, 1979 - r-Eeting to be arranged with violator, T<:Ywn of Ajax t-Jest of Shoal Foad and MI'OCA staff in order to resolve situation. North of Range Line FDad Carruthers Creek Watershed 1979.11,07 /It tIl I ~ 0 CD Page VII tll TO: Executive Ccmnittee, M.T.R.C.A., #17/79 I ~ Administration of Ontario Regulation 735/73 - July, August, SeptE~ and October, 1979. 0 RE: \0 LOCATION VIOLATION NOTICE ISSUED ACTION TAKEN City of Mississauga V-286, Pacific Paving Limited - Owner will be sul:mitting letter regarding restoration lDt 5, Con. 4 EH5 OCtober 24, 1979 of slopes. South of Bri ttania lbad E/5 of 4 th Line East Etobicoke Creek \\'atershed Town of Caledon (01inguacousy) V-287, David Tait and patricia - o.vner has contacted. this Authority for further lDt 20, Con. 4 \oJI15 \'lalker advice. North of 17th 5ideroad on October 24, 1979 - f.Eeting has been arranged. E/5 of 4th Line West Northv.est of Allca Etobicoke Creek Watershed 1979.11.07 /It C\.. B-410 , the metropoUtan toronto and region conservation authority minutes Report 118/79 EXECUTIVE COMMITTEE WEDNESDAY-DECEMBER-S-1979 118/79 ~ The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, December 5, 1979, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning and Policy W.A. McLean Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & POlicy Mrs, A. C . Deans Development Coordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather HEARING Following the Roll Call, the meeting recessed to hold a Hearing re: Kingspoint Developments City of Brampton Etobicoke Creek Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chainnan Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs, L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean 1,dJu . - Historical Sites Division R.K. Cooper Adm. - Finance Division G. Dudar Adm. - Conservation. Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett . Adm. - Property & Administration Division W.E. Jones '. B-411 ...2- PRESENT FOR THE MEETING (Contd.) Executive Secretary Mrs. K. Conron Research Planner, Planning & Policy Mrs. A,C. Deans Development Coordinator, Planning & POlicy J.W. Maletich Bead, Flood Control Section, WRD J .C. Mather MINUTES The Minutes of Meeting 117/79 were presented. Res. 1488 Moved by: E.B. Card Seconded by: E.V. Rolb RESOLVED THAT: The Minutes of Meeting 117/79, as presented, be adopted as if read, CARRIED, SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEM FOR CONSIDERATION OF.THE AUTHORITY AND RECOMMENDS ITS ADOPTION: 1- PERSONNEL SUB-COMMITTEE -Report #6/79 Mrs. Hancey presented Report 16/79 of the Personnel Sub-Committee. Res. 1489 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: Report 16/79 of the Personnel Sub-Committee be received, and THE EXECUTIVE COMMITTEE RECOMMENDS THAT Recommendations Nos. 10 and 13, as contained therein and set forth herein, be approved: 110 REMUNERATION OF THE CHAIRMAN AND VICE CHAIRMAN The Authority make application to the Ontario Municipal Board for authorization to pay the Chairman $18,000.00 per annum and the Vice Chairman $7,000.00 per annum, effective January 1, 1980. 113 MEMBERS - PER DIEM The Authority make application to the Ontario Municipal Board for authorization to pay members per diem in the amount of $45.00, effective January 1, 1980. CARRIED J SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 2. MANAGEMENT STUDY REVID~ SUB-COMMITTEE -Report of Meeting 15/79 Report 15/79 of the Management Study Review Sub-Committee was presented for con- .ideration of the Executive Committee. Res. '490 Moved by: Mrs. F. Gell Seconded by: Dr. T.H. Leith RESOLVED THAT: The Report of Meeting #5/79 of the Management Study Review Sub- Committee be received and the recommendations as contained therein, as amended and set forth herein, be adopted: I. THAT the Final Report - Organizational Review Phase I: The Metropolitan Toronto and Region Conservation Authority, October, 1979, of Hickling- Johnston Limited, Management Consultants, be received, and THAT the following action be taken: (a) The Executive Committee review and re-state the Authority's role for the 1980's1 (b) The Executive Committee examine procedures for ensuring that policy and planning matters are more fully dealt with on a continuing~J (c) Additional meetings of the Executive Committee and the Personnel and Finance Sub-Committees be scheduled in 1980. . -3- 8-412 II. THAT the Secretary-Treasurer be requested to prepare a report and recommendations, for consideration by the Personnel Sub-Committee on the staff organizational structure of the Authority, including the strength- ening of the Personnel Management function of the Authority. III. THAT the Information and Education Advisory Board be requested to develop specific programs for improving the ~fectiveness of the Authority in relation to its fundiag agencies and their constituencies to ensure that its financial requirements are met insofar as possible; AND to prepare a report and recommendations for the consideration of the Executive Committee. IV. THAT the staff report on Data Processing be received and appended as Schedule "A" of these Minutes; and THAT budget provision be made in 1980, in the amount of $13,000.00 to carry out a study of the Authority data processing needs; AND FURTHER THAT the Data Processing Study be integrated with the report and recommendations of the secretary-Treasurer as set forth in Recommendation II of this report. V. THAT the Secretary-Treasurer be directed to review the principles by which the Authority remunerates all of its staff, inclusive of fringe benefits, and to make recommendations for the consideration of the Personnel Sub-Committee. CARRIEDr 3. THE CHAIRMEN'S COMMITTEE OF THE ONTAnIO CONSERVATION AUTHORITIES -Proposed Expansion of Chairmen's Committee Office , 'The Chairman presented a letter, da ted November 20', 1979, received from the Chairman of The Chairmen's Committee of the Ontario Conservation Authorities, together with a resolution adopted at a general meeting of chairmen on November 19, 1979. Res. 1491 Moved by: C.F. Kline Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority re- affirm Resolution #109 of the Executive Committee, adopted April 25, 1979, as followtf: "Iles. '109 Moved by: J.S. Scott Seconded by: C.F. Kline WHEREAS The Metropolitan Toronto and Region Conservation Authority supports The Chairmen's Committee of the Ontario Conservation Authorities, and the role and function that the Committee presently performs in presenting a common viewpoint to the Government of the Province of Ontario in matters affecting conservation authorities; AND WHEREAS there are, within the conservation authorities of Ontario, substantial staff resources to provide the necessary background information and analysis which reflect the concerns of individual authorities and groups of authorities which it would be difficult for staff of the Chairmen's Committee to provide; AND WHEREAS the Authority is of the opinion that matters of policy affecting individual authorities or groups of authorities are the responsibility of such authorities or groups of authorities; THEREFORE BE IT RESOLVED THAT The Metropolitan Toronto and Region Conservation Authority advise The Chairmen's Committee of the Ontario Conservation Authorities that it does not aupport the proposal to engage a full-time Secretary-Manager/Executive-Secretary on the basis set out in the proposal received under date of April 5, 1979; AND BE IT FURTHER RESOLVED THAT The Authority would not support the proposed levy to finance the expansion of the Chairmen's Committee office. CAllllIED;" -and THAT the Chairman of the Authority be requested to report to the Executive Committee on any further developments in connection with this matter. CARRIED, 4 . PERSONNEL SUB-COMMITTEE -Report 16/79 Mrs. Hancey presented Report 16/79 of the Personnel Sub-Committee. - Res. 1492 Moved by: Mrs. L. Hancey Seconded by: B.B. Card RESOLVED THAT: Report ~6/79 of the Personnel Sub-Committee be received and appended as Schedule "B" of these Minutes; and THAT Items Nos. 1, 2, 3, 4, 5, 6, 7, 8, 9, 11 and 12, as contained therein, be approved. CARRIED; B-413 -4- 5. ONTARIO RECREATIONAL CANOEING AFFILIATION MEETING, BOYNE RIVER NATURAL SCIENCE SCHOOL', SHELBURNE, ONT., DECEMBER 7-9, 1979 -Attendance at A staff communication was presented advising that the above meeting is being held to decide the format and standards to govern canoe instructional programmes. The format and standards set will govern tbe programme operated by the Authority at the Claireville Conservation Area. Mr. A. Wickens is a member of Canoe Ontario and this association is prepared to pay his travel cost to attend the meeting. Registration, two nights' accommodation and meals are the responsibility of the participant. Res. '493 Moved by: E.V. Kolb Seconded by: Dr. T.H. Leith RESOLVED THAT: Mr. Andy Wickens be authorized to attend the Ontario Recreational Canoeing Affiliation meeting at the Boyne River Natural Science School at Shelburne, Ontario, to be held December 7-9, 1979; and THAT his expenses in connection therewith, in the amount of $40.00, be paid. 6. DECISION OF HEARING CARRIED; -Kingspoint Developments Ci ty of Brampton (Etobicoke Creek Watershed) Res. '494 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: This Executive Committee confirm the decision of the Bearing held this 5th day of December, 1979; and THAT the application of Kingspoint Developments, in accordance with Ontario Regulation 735/73, for permission to construct a building and regrade a portion of the property in an area regulated by this Authority, and being Part of Schedule 1, more specifically Sheet No.16 of the Flood Line Map of the Etobicoke Creek, and Part of Block 1, Registered Plan A-2l, City of Brampton (Etobicoke Creek watershed), be approved, subject to: (a) All the cut and fill operation deemed necessary taking place within the area of the subject property boundaries (i.e., the church site), (b) All disturbed areas being landscaped and restored to the satisfaction of the Au tho ri ty ; (c) No depressions or ponds being created as a result of the alteration of the existing contours; (d) The proposed sanitary sewer and storm sewer being constructed and installed in such a manner as not to interfere with the control of flooding; (e) No earth berms being constructed across the flood plain of the Etobicoke Creek; ( f) Every effort being made to avoid silting of the Etobicoke Creek during construction; (9) All work being completed to the satisfaction of The Metropolitan Toronto and Region Conservation Authority. On a recorded vote - voting "YEA": 8 Voting "NAY.: 4 M.W.H. Biggar R.G. Henderson M.J. Breen Mrs. F. Gell E.H. Card C.F. Kline Mrs. J.A. Gardner J.S. Scott Mrs. L. Hancey E.V. Kolb Dr. T.H. Leith Mrs. S. Martin CARRIED, 7. FINANCIAL REPORT AND ACCOUNTS -October, 1979. Mr. Scott presented the Financial Report and Accounts for the month of October, 1979. Res. '495 Moved by: J.S. Scott Seconded by: E.H. Card 0 -~ 8-414 RESOLVED THAT: The Financial State~ent for the month of October, ~979, be received; and that the puyment of the Authority accounts, in the amount of $1,319,515.00, being (a) Current Expenditures - Wages and Salaries $272,129.26; Materials & Supplies $221,958.56: (b) Capital Expenditures - Wages & Salaries $29,981.48: Materials & Supplies $777~736,46: and (c) Other Programs - Wages & Salaries $5,856.40: Materials & Supplies $11,852.84, be approved. CARRIED; 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Regional Municipality of Peel To construct a watermain crossing a tributary of the Humber River, Gore Road, City of Brampton A staff communication was presented advising that an application has been received from The Regional Municipality of Peel to construct a watermain crossing at the above location. Res. '496 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of The Regional Municipality of Peel, be received: and TH~ the application of The Regional Municipality of Peel for permission to construct a watermain crossing on Lot 9, Concession 9, Humber River water- shed, be approved, subject to: (a) The river configuration being maintained after construction; (b) Every effort being made to minimize silting of the creek during construction; (c) Provision being made to allow for continuous flow in the creek; (d) All areas disturbed due to construction being restored to the satisfaction of the Authority: (~ Plan Number 3736-0 forming a part of the permit. . .. . . CARRIED; 9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Regional Municipality of Peel To cross a tributary of the Humber River with watermain, intersection of Gore Road and 15th Sideroad, City of Brampton A staff communication was presented advising that an application has been received from The Regional Municipality of Peel for permission to cross the Lindsay Creek (a tributary of the Humber River) with a watermain at the above location. Res. '497 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of The Regional Municipality of Peel, be received: and THAT the application of The Regional Municipality of Peel for permission to place a watermain crossing the Lindsay Creek on Lot 15, Concession 10, City of Br~mpton (Humber River watershed), be approved, subject to: (a) The crossing being restored with rip rap on the banks and bed of the river. The rip rap must be preceded by a filter mat or a 6"-12" layer of crushed stone; (b) The river configuration being maintained after construction; (c) Every effort being made to minimize silting of the creek during construction; (d) All areas disturbed due to construction being restored to the satis- faction of the Authority; (e) provision being made to allow for continuous flow in the creek. CARRIED; 8-415 -6- 10. APPLICATION' FOR PERMIT UNDER ONTARIO REGULATION 735/73 City of Mississauga To construct the Dundas Street East storm sewer, immediately west of the Etobicoke Creek A staff communication was ~resented advising that an application has been re~eived from the City of Mississauga for permission to construct the Dundas Street East storm sewer with outfall into the Etobicoke Creek. Res. 1498 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of the City of Mississauga, be received; and ~T the application of the City of Mississauga for a permit to construct the Dundas Street East storm sewer and outfall located immediately west of the Etobicoke Creek, be app roved, subject to: (a) The rip ra~ protection being extended into the creek in order to reduce the'.possibili"ty of the creek bed being eroded, (b) All areas disturbed due to construction being restored to the satisfaction of the Authority; (c) Plans C-16691, C-16692 and C-l6704 forming part of the permit; (d) Every effort being made to minimize silting of the creek. CARRIED, 11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. & Mrs. G.K. Moore To construct addition to existing dwelling at 97 Clarence Street, Woodbridge, Town of Vaughan (Humber River Watershed) ~ At~ff communication was presented advising that an application has been received from Mr. and Mrs. G.K. Moore for pe~~ission to construct a l4'x20' addition to an existing dwelling at the above location. Res. 1499 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Mr. and Mrs. G.K. Moore, be received; and THAT the application of Mr. and Mrs, G.K. Moore for permission to construct an addition to an existing dwelling on Part of Lot 8, R.P. 546, Town of Vaughan (Humber River watershed), be approved, subject to: (a) All excess excavated material being removed from the lot, (b) All work being in accordance with the construction drawings da ted Ma y 20, 1979, as prepared by R. Perri, (c) Drawings Nos. 1 to 4, project No. 79025, forming part of the permi t, Cd) All work being completed to the satisfaction of the Town of Vaughan and of The Metropolitan Toronto and Region Conservation Authority. CARRIED, 12. . APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Grace Retirement & Community Enterprises To construct Senior Citizens' apartment building, Part Lot 30, Brampton #2, corner Maple & Nelson Streets, City of Brampton (Etobicoke Creek Watershed) A staff communication was presented advising that further to decision of the Hearing Board of July 25, 1979, the applicant has submitted a site conceptual plan in accordance with the following resolution: -7- 1-416 "DECISION OF HEARING -Hr. J.C, Enos - on behalf of - Hr. Arthur Morrison (Grace Retirement & Community Enterprises Inc.) City of Brampton !tobicoke Creek Watershed . Res. 1289 Hpved by: J.S. Scott Seconded by: C.F. Kline BE IT RESOLVED THAT: This Executive Committee confirm the decision of the Bearing held this 25th day of July, 1979; and THAr the application of Mr. J.C. Enos on behalf of Mr. Arthur Morrison (Grace Retirement and Community Enterprises Inc.), in accordance with Ontario Regulation 735/73, for permission to construct a senior citizens' apartment building on Part of Lot 30, Brampton No.2, being the corner of Maple Street and Nelson Street in the City of Brampton (Etobicoke Creek watershed), be deferred until such time as the applicant is prepared to submit to the Authority a site concept plan in accordance with the conditions as stated in Section 6 (subsection 1) of Ontario Regulation 735/73. CAllI.IED;" Res. #500 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOL VED THAT: The staff communication, as amended, together with the application of Grace Retirement and Community Enterprises Inc., be receivedJ and THAT the application of Grace Retirement and Community Enterprises Inc. for permission to construct a senior citizens' apartment building on Part of Lot 30, Brampton No. 2, being the corner of Maple and Nelson Streets in the City of Brampton (Etobicoke Creek watershed), be approved, subject to: (a> The Authority receiving detailed site and engineering plans consonant with the conceptual plan as submitted by the applicant as it relates to the final construction of the building, and which will satisfy the flood control requirements of the AuthoritYJ (b) Every effort being made to minimize si~ting of the creek during construction. CARRIED 1 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 The Regional Municipality of Durham To place fill within the flood plain of the Duffin Creek, Part Lot 1 and Lot 12, Range 3 Front Concession A staff communication was presented advising that an application has been received from The Regional Municipality of Durham for permission to construct a berm within the flood plain of the Duffin Creek at the above location. Res. 'SOl Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of The Regional Municipality of Durham, be received I and THAT the. application of The Regional Municipality of Durham for permission to place fill within the flood plain of the Duffin Creek, on Part Lot 1 and Lot 12, Range 3 Front Concession (Duffin Creek watershed), be approved. CARRIEDJ 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Maria & Heinz Ruckdaeschel TO install two culverts on tributaries of the Duffin Creek, Part Lot 3, Concession 3, Township of UXbridge A staff communicat~on was presented advising that an application has been received from Maria and Heinz Ruckdaeschel for permiSSion to install two culverts at the above location. Res. .502 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline 8-417 -8- RESOLVED THAT: The staff communication, together with the application of Maria and Heinz Ruckdaeschel, be received~ and THAT the application of Maria and Heinz Ruckdaeschel for permission to install two culverts on tributaries of the Duffin Creek, on Part Lot 3, Concession 3, Township of Uxbridge (Duffin Creek watershed), be approved, subject to: , (a) All work being completed in accordance with the drawings prepared by the applicants and submitted with their application, which will form part of the permit~ (b) Every effort being made to minimize the silting of the creek during construction; (c) All areas disturbed due to the installation of the culverts being restored to the satisfaction of the Authority and of the Township of Uxbridge. CARRIEDJ 15. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 U~ban & Country Development Limited To construct 6" dia. PVC watermain cros~ng of the Centreville Creek, Lot 1, Registered Plan #1000, Town of Caledon (Humber River Watershed) A staff communication was presented advising that an application has been received from Urban & Country Development Limited for permission to construct a 6- dia. PVC watermain crossing at the above location. Res. '503 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Urban & Country Development Limited, be received~ and THAT ~he application of Urban & Country Development Limited for permission to construct a watermain crossing of the Centreville Creek, on Lot 1, Registered Plan '1000, Town of Caledon (Humber River watershed), be approved, subject tOI (a) All work being done in accordance with Drawing t18, File 7403-A-l8, as prepared by Paul Theill Associates Limited and dated June, 1979~ (b) All disturbed areas being restored to the satisfaction of the Town of Caledon and of The Metropolitan Toronto and Region Conservation AuthoritYJ (c) Every effort being made to minimize erosion and siltation along the creek during construction. CARRIEDJ 16. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Joseph Grell To place fill and construct factory building vicinity of Maple Avenue and Duncan Road, Town of Richmond Hill (Don River Watershed) A staff communication was presented advising that an application has been received from Joseph Grell for permission to place 1.04 m. of fill at the above location. Res. '504 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Joseph Grell, be received; and THAT the application of Joseph Grell for permission to place fill an~ to construct an industrial building on Lot 30, Registered Plan 3805, Town of Richmond Hill (Don River watershed), be approved, subject to: (a) All work being 'done in accordance with the plan prepared by Stehower. Landscape Contractors and dated June 12, 1979~ I ji.~~'I)) ,All excess fill being removed f~C?m ~ s~ te immediately after gradinq and construction is completed: . CARRIEDJ -9- 8-418 17. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Joseph Kaufmann (The Ki tchen Cen tre) To place fill for development of parking lot at rear of '2050 Dundas Street East in conjunction with construction of addition to existing structure, City of Mississauga (Etobicoke Creek Wa tershed). A staff communication was presented advising that an application has been received from Joseph Kaufmann for permission to undertake the above-noted works. Res. '505 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Joseph Kaufmann, be received; and THAT the application of Joseph Kaufmann for permission to place fill for a proposed parking lot on Lot 1, Concession 1, S.D.S., (Etobicoke Creek watershed) be approved, subject to: (a) The applicant complying with all municipal by-laws and regulations~ (b) All areas disturbed due to construction being restored to the satis- faction of the Authority; (c) A snow fence being erected along the south and west periMeter of the parking lot and remaining in good condition throughout the construction period; (d) All excess fill material being removed from the site; (d) A permanent barrier being placed around the south and west perimeter of the parking lot. CARRIED; 18. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Glynnwood Gate Corporation TO construct a retirement residential building on Part of Lot 30, Concession 1, just south of #7750 Bayview Avenue, Town of lo1.arkham (Don River Watershed) A staff communication was presented advising that an application has been received from Glynnwood Gate Corporation for permission to construct a retirement residential building at the above location. Res. '506 Moved by: Mrs. L. Hancey Seconded by: C.F. Kline RESOLVED THAT: The staff communication, together with the application of Glynnwood Gate Corporation, be received; and THAT the application of Glynnwood Gate corporation for permission to construct a retirement residential building ~n Part of Lot 30, Concession 1, west side of Bayview Avenue, Town of Markham (Don River watershed), be approved, subject to: (a) All surplus excavated material being removed from the site~ (b) All work being undertaken in accordance with site grading plan, Job '7302, Plan #2, as prepared by Jackson Ypes Associates Architects and Planners; (c) The application complying with all municipal requirements, (d) Every effort being made to minimize silting of the Don River during construction. CAlmIED~ B-419 -10- 19. THE MUNICIPALITY OF MEtROPOLITAN TORONTO -Request for Permanent Easement: south of Steeles Avenue west of Islington Avenue A staff communication was presented advis~ng that a request has been received from The Municipality of Metropolitan Toron~ to provide a permanent easement for a sanitary trunk, sewer'south of $teeles Avenue, west of Islington Avenue, in the Rowntree Mill Road area. The proposed easement affects Authority-owned lands in the Borough of Etobicoke and the City of North York. Res. '507 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: A permanent easement be granted to The Municipality of Metropolitan Toronto for a sanitary trunk sewer located south of Steeles Avenue, west of Islington Avenue, in the Rowntree Mill Road area. Said ease- ment affects Authority-owned land known as Parts of Lots 21, 22 and 23, Concession VII, W.Y.S., and Parts of Lots lO, 11, 12, 13, 25, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42 and 43, Registered Plan 2388, City of North York, and Part of Lot 40, Concession 'A', F.T.H. in the Borough of Etobicoke. Said lands are designated as Part 1 on Plan 64R-2079, Parts 1, 2, 3, 4, 5 and 6 on Plan 64R-6403, Parts 1 and 2 on Plan 64R-537l and Parts 1 and 2 on Plan 64R-6l98, in The Municipality of Metropolitan Toronto. The easement to be granted for the nominal consideration of $2.00, subject to The Municipality of Metropolitan Toronto being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect therebo 20. CITY OF NORTH YORK CARRIED; -Request for Permanent Easement: east of the North York General Hospital, south side of Sheppard Avenue A staff communication was presented advising that a request has been receiv~d from the City of North York to provide a permanent easement for a sanitary aewer, located to the east of the North York General Hospital on the south aide of Sheppard Avenue. Res. '508 Moved by: M.W.B. Biggar Seconded by: Mrs. F. Gell RESOLVED THAT: A permanent easement be granted to the City of North York for a aanitary sewer located to the east of the North York General Hospital, on the south side of Sheppard Avenue. Said easement affects Authority-owned land known as Part of Lot 15, Concession III, E.Y.S., City of North York, The Municipality of Metropolitan Toronto, desiqnated as Part 3 on Plan 65R-7982. The easement to be granted for the nominal consideration of $2.00, subject ~ the City of North York being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and BE IT FURTHER RESOLVED THAT: The appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; 21. DOWNSTREAM EROSION CONTROL . -Contribution by Private Owners A staff report was presented having regard to the matter of private owner contribution to downstream erosion control. Res. '509 Moved by: J.S. Scott Seconded by: Mrs. L. Hancey RESOLVED THAT: The Flood Control and Water Conservation Advisory Board be requested to make recommendations for an appropriate contribution rationale for private owners. benefiting from an Erosion and Sedimentation Control Programme, in accordance with Authority Resolution '78/79, as follows: ".... 178 Moved by: '.J. McKechnie Seconded by: Mra. H. Pownall II IT RESOLVED THAT: The Executive Colllllittee of the Authority review and -11-: 8-420 report to a future Authority meeting on the sliding scale of payments required of property owners in projects where bank stabilization and erosion control works are required, taking into account all factors, including: (a) The type of structure t~ be protected, i.e.~ private home, business premis~s, high rise apart~ents, both condominium and rental; (b) The ability of owners to write off costs, i.e., private home versus apartment business; (c) Cost of work to the Authority; (d) Possibility of assessing municipality as benefiting municipality. CARRIED;" CARRIED, 22. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981: Proposed Major Remedial Work: Nos.27-3l Alamosa Drive, City of North York (Don River Watershed) -OWner Contribution A staff communication was presented advising that the Erosion Control and Slope Stabilization work programme for 1980 includes Nos. 27-31 Alamosa Drive, City of North York, as a priority site scheduled for remedial work in 1980. Res. '510 Moved by: Mrs. F. Gell Seconded by: Mrs. L. Hancey RESOLVED THAT: Prior to slope stabilization work being carried out at the rear of Nos. 27-31 Alamosa Drive, City of North York (Don River watershed) , the benefiting property owners be required to contribute $4,300.00 towards the cost of the work; and THAT the benefiting property owners be further required to provide a permanent easement to the parcel of land on which remedial work is proposed. CARRIED, 23. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control & Slope Stabilization in The Regional Municipality of Peel: proposed Remedial Work - wildwood Park and vicinity, City of Mississauga (Mimico Creek Watershed) A staff communication was presented advising that, as outlined in the staff report entitled "Erosion Control and Bank Stabilization in the Regions of Peel, York and Durham", which was approved by the Executive Committee at Meeting 115/78, remedial work is proposed at wildwood Park in the City of Mississauga. Res. '511 Moved by: I.V. Kolb Seconded by: Mrs. F. Gell RESOLVED THAT: Erosion control work be carried out at Wildwood Park and vicinity, City of Mississauga (Mimicocreek watershed), at an estimated cost of $16,000.001 and THAT the,approval of the Ministry of Natural Resources be requested. CARRIED; 24. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quotation: Septic System, Phase II A staff communication was presented advising that the following quotations have been received for the supply and installation of a septic tank,system for Phase II of the Lake St. George Conservation Field Centre: Contractor Price Quoted Burns Septic Tank Company Limited $4,500.00 (Newmarket) Harry Smith & Sons $4,760.00 (awarded Phase I contract) B-421 -12- Contractor Price Quoted A.B.C. Sanitary Contractors No bid (Richmond Hill) Weldrick Construction Company No bid (lU:chmond Hill) Res. .512 Moved by: B.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The quotation of Burns Septic Tank Company Limited, for the .upply and installation of a septic tank system for Phase II of the Lake St. George Conservation Field Centre, in the amount of $4,500.00, be accepted, it being the lowest quotation received. CARRIED; NEW BUSINESS 25. SEMINAR FOR CAMP GROUND OPERATORS Res. '513 Moved by: Mrs. F. Gel! Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff be directed to prepare a report, for consideration by the Executive Committee, regarding the advisability of a seminar for camp ground operators being held by The Metropolitan Toronto and Region Conservation Authorities for interested Authorities in Ontario. CARRIED; 26. MANAGEMENT STUDY REVIEW SUB-COMMITTEE -Appreciation Res. '514 Moved by: M.W.H. Biggar Seconded by: Mr.. J .A. Gardner RESOLVED THAT: The Chairman of the Management Study Review Sub-COJllllittee be thanked for his excellent work in connection with the work of the committee. CARRIBD, 27. MINUTES - COMMITTEES AND SUB-COMMITTEES Res. . 515 Moved by: J.S. Scott Seconded 'by: Mrs. S. Martin RESOLVED THAT: Commencing on January 1, 1980, Minutes of all Committees and Sub-Commi ttee meetings be recorded in a similar manner to those of Advisory Board meetings. CARRIED; 28. -THE EVOLUTION OF ENVIRONMENTAL ASSESSMENT IN TRANSPORTATION PROGRAMS IN ONTARIO" MR. BIGGAR advised that he had received the above tentative statement and would make this available to the staff. He believes the statement to be a u.eful discussion paper, and requested that staff comment upon and circulate the paper to the Executive Committee members. 29. MEETING '19/79 - DECEMBER 19, 1979 MR. HENDERSON advised that the meeting of December 19 will be held at the Authority office, and will be followed by luncheon at the Kortright Centre for Conservation at 12:30 p.m. 30. ADJOURNMENT On Motion, the Meeting adjourned at 1:45 p.m., December 5. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer B-422 SCHEDULE "A- REPORT ON DATA PROCESSING The staff has given consideration to the use of data processing systems in the Authority's operation. An overview s~udy of our operations indicates that there' is potential for more effective use of staff time, more complete and timely reporting and more effective record keeping with the use of data processing equipment. The overview indicated that the areas in which such equipment may be of assistance are in our cost control and reporting system, accounting system, inventory system, word processing system, information retrieval system and engineering data. The overview has also indicated that, should data processing be found to be cost effective for the Authority, there is a wide range of equipment and systems available. There is also a number of op~ions for the Authority in obtaining data processing equipment. These options include purchase, rental and terminals tied into other private or government systems. The only use the Authority presently makes of data processing equipment is the bookkeeping machine used in the payroll and accounts section and work that is contracted to others for specific projects. The bookkeeping machine is being used to the extent of its capabilities, and further mechanization of office procedures is not possible on this machine. The extent to which the Authority can properly make use of data processing equipment requires professional advice based on a thorough understanding of the Authority's operations. Consulting services are available from a number of sources, including the Province of Ontario and The Municipality of Metropolitan Toronto, who will provide consulting services based on the equipment and services which they can provide. Advice is also available from the manu- facturers of equipment. Such advice would be best provided by an independent consultant with experience in devising systems for public agencies like the Authority and who can evaluate how the Authority would best be serviced, whether that be tying into an existing government system, making use of private facilities or owning our own equipment. Staff contacted an independent consultant in the field, Gordon Molnar & Associates Limited, and discussed with them the type of information that is required in order for the Authority to make the proper decisions as to the effective use of data processing equipment. A study of the Authority's operations, with the following components, is necessary to analyze the current and future needs of the Authority: (a) Survey the information needs of the Authority in each Division and prepare information requirements; (b) Examine each Division's requirements within the following functional areas: .cost control and reporting system .accounting system .inventory system .word processing system .information retrieval system .engineering system (c) To propose solutions to the problems and needs identified in each functional area that is technically, operationally and economically feasible; (d) To include in the review of solutions an examination of the data processing services which may be available fran the Province of Ontario and the Authority's member municipalities~ (e) To prepare terms of reference for the design and implementation of a system appropriate for the Authority. The consultant has advised that the cost of such a study would be approximately $13,000.00. B-423 SCHEDULE "B" THE METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY REPORT #6/79 PERSONNEL SUB-CO~~ITTEE The Personnel Sub-Committee met at the Authority Office, 5 Shoreham Drive, DOWNSVIEW, Ontario on Wednesday, November 28, 1979 commencing at 10:00 a.m. PRESENT WEP.E Chairman Mrs. L. Hancey Members M. J. Breen E. V. Kolb Dr. T. H. Leith Mrs. S. Martin Authority Chairman R. G. Henderson Authority Vice-Chairman Mrs. F. Gel! Authority Member J. S. Scott Secretary-Treasurer It. G. Higgs Director, Planning and Policy W. A. McLean THE FOLLOWING ITE~S WEP.E CONSIDERED:- 1) a) Proposed Salary Schedule for 1980; b) Proposed Wage Schedules for 1980; c) Salary Adjustments for 1980; 2) Employee Benefits - Leave of Absence due to Sickness; 3) Employee Benefits - Vacation Credits 4) Organization of the Finance Division; ~) Organization of Water Resource Division; 6) Organization of Information & Education Division; 7) Re-Classification - Conservation Land Hanagement Division; S) 1980 Staff Management Seminar; 9) Certified Professional Secretary Standing - Executive Secretary; 10) Remuneration of the Chairman and Vice Chairman; 11) Christmas Holiday 1979; 12) Appointments. Transfers and/or Promotions to the Full Time and Full Time Probationary Staff; 13) Members - Per Diem IT WAS AGREED, AND THE SUB-COHMITTEE RECOMMENDS:- 1) a) THAT the 1980 classification level ranges together with the guidelines for the use of the revised salary structure. attached as Appendix 1. be approved effective January 1, 1980; bl) THAT the 1980 Wage Schedule attached to this report as Appendices 2(a), 2(b) , 2(c) and 2(d) be approved; b2) THAT the Secretary-Treasurer be requested to review the hourly rated employees of Black Creek Pioneer Village, in conjunction with the recommendation of Ueeting #5/79 of the Hanagement Study Review Sub-Committee. c) THAT the salary adjustment of November 28. 1979. be approved. B-424 Report #6/79 Page #2 Personnel Sub-Committee 2) EMPLOYEE BENEFITS - LEAVE OF ABSENCE DUE TO SICKNESS . THAT the staff report re: Employee Benefits - Leave of Absence due to Sickness be received and attached to this report as Appendix 3, and further THAT the sick leave credit benefit plan be reviewed on the basis of the total benefit package and the task be undertaken in conjunction with the recommendation of Meeting #5/79 of the Management Study Review Sub-Committee, and further THAT the Secretary-Treasurer be directed to review with the Ministry of ~atural Resources, Province of Ontario the funding of vested accumulated sick leave. 3) Et~LOYEE BENEFITS - VACATION CREDITS THAT the vacation credits appendixed as Appendix 4 be approved effective January 1, 1980. 4) ORGANIZATION OF THE FINANCE DIVISION THAT the organization chart for the Finance Division and the terms of reference for the Supervisor, Budf,et Control and Assistant Accountant appendixed as Appendix 5 be approved. 5) ORGANIZATION OF THE WATER RESOURCE DIVISION THAT the organization chart for the Water Resource Division and terms of reference for Project Engineer - Hydrology appendixed as Appendix 6 be approved, and further THAT the position Engineer - Regulation Control be deleted. 6) ORGANIZATION OF THE INFORHATION & EDUCATION DIVISION THAT the organization chart for the Information and Education Division and the terms of reference for the position of Conservation Education Supervisor (Kortright) appendixed as Appendix 7 be approved, and further THAT a residence be provided on the same basis as the Conservation Education Supervisors of the residential Conservation Field Centres, and further THAT the position Conservation Education Supervisor (Field Centres) be amended to read Classification Level 7-A. 7) RE-CLASSIFICATION - CONSERVATION LAND MANAGEMENT DIVISION THAT the classification of Conservation Services Technician, Conservation Land Management Division, be re-classified to classification Level 5, appendixed as Appendix 8. 8) 1980 STAFF HANAGEHENT SEHINAR THAT the staff be authorized to organize a staff management seminar at the Leslie Frost Resource Centre, February 28, 1980 to ~arch 2, 1980 and that the expenses in connection therewith be paid. 9) CERTIFIED PROFESSIONAL SECRETARY STANDING - EXECUTIVE SECRETARY THAT Mrs. K. Conron, Executive Secretary, be authorized to take the Certified Professional Secretary examination to be held at Ryerson Polytechnical Institute, Toronto, in the spring of 1980, and further THAT per application and examination fees, in the amount of $90.00, be paid. B-425 REPORT #6/79 Personnel Sub-Committee , Page '3 10) REMUNERATION OF THE CHAIR!IA.'i AND VICE CHAIRMAN THAT the Authority make'application to the Ontario UunicipaI Board for authorization to pay the Chairman $18,000.00 per annum and the Vice Chairman $7,000.00 per annum effective January I, 1980. 11) CHRISTMAS HOLIDAY 1979 THAT all full-time, full-time probationary, seasonal and contract employees be granted a leave of absence with pay on Monday, December 24, 1979, and further THAT all full-time, full-time probationary, seasonal and contract employees required to maintain essential services on Monday, December 24, 1979 be given a one day's leave of absence with pay in lieu of. 12) APPOINT~mNTS, TRANSFERS, AND/OR PROHOTIONS TO THE FULL TIME AND FULL TIHE PROBATIONARY STAFF THAT the appointments, transfers and/or promotions to the full time and full time probationary staff apperidixed as Appendix 9 be approved. 13) MEMBERS - PER DIEM THAT the Authority make application to the Ontario Uunicipal Board for authorization to pay members per diem in the amount of $45.00, effective January 1, 1980. B-42; APPENDIX 1 (a ~ the metropolitan toronto and region conservation authority PAGE: C-7 Personnel I,lanual EXEOJTIVE N! (!7 Employee Classifications and Categories DATE: Guidelines re Salary Structure RESOWTION N2 1) Low-Mid-High points are established each year. 2) A standard increase, based on the cost of living, avail- abili,ty of funds etc, . will be applied as a percentage to all low-mid-high points in all classification levels. 3) All employees will be given this standard increase as a percentage of their existing salary except the maximum standard increase any employee can receive will be the applicable amount the high point for the level is being increased. This will only affect employees earning in excess of the high pOint in their classification level. 4) SUbject once again to the availability of funds, a merit increase will be established for each level based on a percentage of the mid point in each level. 5) Uerit increases will only be given up to the maximum for each classification level and under no circumstances will any merit increase be given which causes the salary of the employee to exceed the high point for the classification level. . ~-4 2 7 AI'I'ENIII X 1 (b) .. c& the metropolitan toronto and region conservation authority PAGE: C-8 Personnel Manual EXEaJTlVE N! (?7 Employee Classifications and Categories DATE: 1980 Level Ranges RESOWTION N! 1980 ~ Low Mid High Merit 1 - - - - 2 8,640 10,260 11,880 410 3 10,800 12,690 14,580 508 . 4 12,960 15,120 17,280 605 5 15,660 17,820 19,980 535 6 18,360 20,790 23,220 624 7 21,600 24,030 26,460 721 8 24,840 27,540 30,240 826 9 28,080 31,320 34,560 626 10 32,400 35,640 38,880 713 11 37,800 41,040 44,280 821 12 43,200 46,440 49,680 929 B-428 APPENDIX Ua) TO: The Personnel Sub_Committee, M.T.R.C.A. - Meeting "6/79 Wednesday, November 28, 1979 FROM: R. K. Cooper, Administrator, Historical Sites Division RE: 1980 Hourly Rated Employees - Black Creek Pioneer Village In 1980, we are attempting to broadly categorize hourly employees at the Black Creek Pioneer Village. Comparison of the 1979 multi-level rate to the proposed 1980 levels indicates an 8.2\ increase at the lowest level. 1979 1980 (proposed) $3.05 - $3.90 $4.00 - $4.80 $4.90 - $5.70 $5.80 - $6.55 $6.65 - $7.45 $7.55 - $8.30 $8.40 Interpreters $3.30 - $6.00 Artisans $4.30 - $7.50 Labourers $3.30 - $6.00 Trades Person $4.30 - $8.50 RECOMMENDATION:- IT IS THEREFORE RECOMMENDED THAT the above proposed 1980 Hourly Rated Employees - Black Creek Pioneer Village - be approved and incorporated into the 1980 Authority Wage Schedule. :jh 1979.11.21 B-429 APPENDIX 2(b) .-..-... TO: The Personnel Sub-Committe, M.T.R.C.A. - Meeting '6/79 Wednesday, November 28, 1979 FROM: W. A. McLean, Director, Planning & Policy RE: 1980 Hourly Wage Rate - Students & Part Time Employees Staff have had several meetings in order to arrange a standard table of wage rates for students and part time employees. The proposed increase in 1980 for the inexperienced level ranges from 8.5\ to 11.8\ while the rate for the experienced level ranges from 7.9\ to 17.1\. In both cases, the highest increase is in the Lifeguards - Guard category. The proposed increase in 1980 for the Technician group ranges from 8.9\ to 10.1\. 1980 HOURLY WAGE RATES - STUDENTS & PART TIME EMPLOYEES Function Inexperienced Experienced 1979 1980 1979 1980 Actual Proposed Actual Proposed Lifeguards - Head $4.45 $4.90 $4.75 $5.20 - Assistant Head $3.80 $4.25 $4.15 $4.55 - Guard $3.20 $3.80 $3.50 $4.10 Gateman $4.45 $4.90 $4.75 $5.20 Attendant $3.50 $3.80 $3.80 $4.10 Labourer $4.45 $4.90 $4.75 $5.20 Technician (Post-Secondary) 1979 1980 Actual Proposed - First Year $4.45 $4.90 - Second Year $4.75 $5.20 - Third Year $5.05 $5.50 RECOMMENDATION IT IS THEREFORE RECOMMENDED THAT the above proposed 1980 Hourly Wage Rates - Students and Part Time Employees - be approved and incorporated into the 1980 Authority Wage Schedule. :jh 1979.11.06 B-430 ~IHX 2(c' TO: The Personnel Sub-Committee, M.T.R.C.A. - Meeting '6/79 Wednesday, November 28, 1979 FROM: W. A. McLean, Director, Planning & Policy RE: 1980 Hourly Wage Rates - Full Time and Seasonal Staff Cons. Land Management 1979 Actual 1980 Proposed & Information & Education Water Resource Wage Scale Wage Scale Labourer Labourer $5.70 - $6.30 $6.25 - $7.00 Lead Hand Lead Hand $6.30 - $7.00 $6.95 - $7.75 Semi-Skilled Labour Assistant Superintendent Assistant Work Supt. $6.60 - $7.30 $7.25 - $8.10 Skilled Labour Maintenance Inspector Nursery Supervisor $7.65 - $8.55 Foreman Works Superintendent $7.30 - $8.25 $8.05 - $9.15 Foreman-Skilled $9.15 - $10.35 The proposed increase in 1980 ranges from 9.6\ to 10.3\ at the bottom level of the scale and ranges from 10.7\ to 11.1\ at the top level of the scale. RECOt+1ENDATION IT IS THEREFORE RECOMMENDED THAT the 1980 Hourly Wage Rates as shown above for - Full Time and Seasonal Staff - be approved and incorporated into the 1980 Wage Schedule. :jh 1979.11.19 B-431 AP?ENDIX 2(d) . TO: The Chairman and Members of the Personna 1 Sub-Committee, M.T.R.C.A. Meeting '6/79 - Wednesday, November 28, 1979 FROM: T. E. Barber, Administrator, Information &, Education Division HE: 1980 Day Rates - .Information and Education Division 1979 1980 Present Rate Proposed Rate Educational Assistant - Level I $22.00/day $25.00/day (Seasonal & Part Tlme Education Staff - Level II $29.00/day. $32.00/day Black Creek Pioneer Village, Conservation - Level III $34.00/day $37.00/day Field Centres, Kortright Centre for - Level IV $39.00/day $42.00/day Conservation and other Proj ects) - Level V $44.00/day $47.00/day Education Specialist $50.00 - $110.00 $50.00 - $125.00 per day per day The proposed-increase in 1980 ranges from 6.8\ in Level 5 to 10.3\ in Level 2. RECOMMENDATION IT IS THEREFORE RECOMMENDED THAT the day rates for Educational Assistants, Levels I-V and Educational Specialists as outlined above for 1980, be approved and incorporated into the 1980 Authority Wage Schedule. :jh 1979. 11. 06 B-432 APPENDIX 3 TO: The Chairman and Members of the Personnel Sub-Committee, M.T.R.C.A. Meeting '6/79 - Wednesday, November 28, 1979 FROM: G. Dudar, Administrator, Finance Division RE: Employee Benefits - Leave ~f Absence due to Sickness In reply to the Personnel Sub-Committee's request at Meeting '3/79, "That the staff review the Authority policy having regard to Employee Benefits -Sickness credits as per Authority Resolution '53 including the financing of the liability and report to the Executive Committee." The staff is pleased to submit the following report. The staff has attempted to address itself to two major questions:- a. Whether the present sick leave credits as a short term disability plan provides an employer sensitive shield for all our employees against major financial hardships resulting from absences due to illnesses which does not qualify under the existing Long Term Disability Plan. b. An unfunded liability which has been growing each year and could cause a financial hardship to the Authority if large payouts were required at any point of time. PRESENT SALARY CONTINUATION PLANS AT M.T.R.C.A. 1. Sick Leave Credits: Sick leave credits accumulate at the rate of l~ days per full calendar month in the employ of the Authority. Up until January 1, 1978, this applied to Full Time and Temporary employees. tffective January I, 1978, when categories of employees were changed, accumulation of SIck leave credits applied to Full Time Employees only. 2. Sick Leave Pay-Out a. All Employees appointed to Temporary or Full Time staff prior to January 1, 1976, who have completed two years continuous service, are entitled to a payout upon termination for any reason. The payout is 50% of the employees accumulated sick credits up to a maximum of six months salary. b. All Employees appointed to Temporary or Full Time staff after January 1, 1976, who have completed five years continuous service on the Temporary or Full Time staff, are entitled to a payout as follows: - i. Upon retirement - 50% of the employees accumulated sick credits up to a maximum of six months salary. 1i. Upon termination for reasons other than retirement - 50\ of the employees accumulated sick credits up to a maximum of three months salary, MINIMUM TIME FRAME FOR MAXI~ruM PAY OUT under 2(b) above Employment Maximum # of Sick Maximum Pay Out Period Day Earnings Termination Retirement up to 5 years nil nil 5 years 90 days 45 days 45 days ~years 180 days 63 days 90 days 15 years 270 days 63 days 126 days 20 years 360 days 63 days 126 days B-433 3. Long Term Disability: All employees appointed to the Full Time staff are eligible for Long Term Disability benefits under an Insurance plan for which the Authority pays 100%. Under this plan, an employee who:- a. has been employed on the Full Time Staff for a minimum of three months; b. has been continuously disabled for a period of three months; c. has presented satisfactory medical evidence; and d. is under the age of 65, is eligible to receive a combined disability income, from all sources, to a maximum of 75% of the employee'S usual monthly income with a minimum of 60\ being paid by the Long Term Disability Insurance Plan. NOTE: The maximum payment by the Long Term Disability Insurance Plan is $12,000. per annum (based on 60% of a maximum salary of $20,000.00). Any accumulated sick pay credits are paid to any employee, in accordance with approved Sick Leave Pay Out policies, at such times as the employee is transferred to the Long Term Disability Insurance Plan. The current premium for Long Term Disability Insurance is $1.34 per $100.00 of salary up to a maximum salary of $20,000.00. BENEFIT Cost of Present Sickness Credits Plan 1. Pay out:- 1977 - $42,000. 1978 - $ 8,400. 1979 - $20,000. (budget) 2. Cost and Trends of Paid Sick Leave It is estimated that such costs amounted to at least $40,000. in 1978. A review of paid sick leave during 1978 indicates that, on the average, the following occured:- a. 3.9 days of paid sick leave was taken by all employees; b. 17\ of the employees who took sick days, have taken ten (10) or more paid sick days during the year; c} Of the 17% of the employees, 67% had single illnesses lasting more than five (5) days which is estimated to have cost the Authority about $10,000; d. 29\ of our full time staff have not taken sick days; and e. A review of these costs and trends appear to lead to two conclusions:- 1) The present system of self-administrating the paid sick leave for other than occasional sickness is cost effective. 2) The 3.9 days of paid sick leave taken on average, combined with the high average, representing sickness occurences exceeding each more than five (5) working days and the low percentage of employees who had taken ten (10) or more paid sick days during the year versus our allowed of eighteen (18) days would appear to indicate that our employees are not abusing the system and that the reward for not abusing the system is a well appreciated incentive program. 3. Future Costs: According to the audited financial statements, the unfunded liabilities for sick leave have risen by 44% in 4 years to a level of $483,000. at December 31, 1978 as compared to the balance of $335,000. at December 3], 1974. B-434 It is interesting to note that in 1975 the growth was 20\ while for 1976, 1977, and 1978 the growth was only 5.7%. 9.9\, and 3.4\ respectively. January I, 1976 was the date on which the payout entitlement was changed from two years of continuous service to five (5) years and that upon termination (as opposed to retirement) the maximum payout was changed from a maximum of six (n) months to three (3) months. WHAT OTHERS ARE DOING l. Participating Regional Municipalities a. Sick Leave Credits: Durham, York and Metro Toronto provide for the accumulation of l~ days per month with no further coverage for Short Term Disability. Peel amended their plan in 1975 and provided both a non-cumulative occasional sick day plan administered by each supervisor and a Peel administered Short Term Disability Plan commencing on the fourth day retroactive to the first day with a coverage of 100% for the first two weeks and two-thirds thereafter to a total coverage of 15 weeks at which time a Long Term Disability plan comes into effect. b. Sick Leave Pay Out: York - after 6 months - 50\ - maximum 6 months Durham - after 5 years - 50\ - maximum 6 months Metro Toronto - after 10 years - - maximum 3 months after 15 years - - maximum 4 months after 20 years - - maximum 5 months after 25 years - - maximum 6 months Peel - Upon the discontinuation of Sick Leave Plan, Peel offered to payout the accumulated sick leave over time which averaged four years. The payout per- centage was dependent on length of service within a government with a maximum of 50\ and up to a limit of 180 days. 2. The Province discontinued the accumulating Sick Leave Benefit Program on April, 1978 and replaced it with a Short Term Disability Plan providing 100\ salary for the first six (6) days and 75% salary for the next 124 working days with an option of 100% salary for the 124 days ,with the off-setting reduction in vested accumulated sick leave. The payout of the accumulated sick leave is limited/to half the annual salary and is made on termination. Employees were also provided with a new severance pay scheme encompassing serV1ce years prior to April I, 1978 and subsequent years at a rate of one (1) week per year payable on termination to those employees who have completed at least one (1) year of continuous service and are terminated due to retirement, lay-off, death or resgination due to disability. 3. Industry - 80% of the private sector for management and office functions have opted for self-administered salary continuation plans not based on sick day credit accumulations, with the following reimbursement levels: REIMBURSEMENTS % of TOTAL 100\ 46.3 60\ to 75\ 5.7 Dependent on length of service 30.0 Other Variables 18.0 100.0 B-435 CONCULSION ON BENEFITS The M.T.R.C.A. Sick Leave Credit Accumulation Plan does not provide a Short Term Disability Plan to 311 it~ Full Time empJc~pes. The present plan' could create a financial hardship to a long term dedicated employee except for the ad hoc intervention of the Executive at certain times. Similarly, new full time employees are not effectively covered. In addition, the Staff is substantially less than adequately covered under the Long Term Disability Plan. FUNDING OF SICK LEAVE CREDITS At the present time, the cash accounting basis for the payments of grants by the Ministry of Natural Resources preclude the ~I.T.R.C.A. from recognizing, on a year-to-year basis the increase in vested sick leave. Each year the M.T.R.C.A., during its budget process, includes in its Administration budget the vested sick leave credits for those who are retiring, and an estimate is made for terminations. However, only actual payments are claimed from the Ministry of Natural Resources. The problem of unfunded liabilities for vested sick leave has been recognized by the Ministry of Intergovernmental Affairs as it applies to Municipalities. In July 1979, this Ministry issued preliminary recommendations which, in general, reflect a freeze in the amount of unfunded vested sick leave to the 1978 balance with any increase in vesting reflected as a reserve or reserve fund. In addition they have recommended that a reserve or reserve fund for 50% of past service committments as at December 31, 1978 be established and amortized over a number of years and the municipalities develop a long term policy which would eventually accumulate a 100\ provision of the outstanding past service accumulation. The M.T.R.C.A. has the authority to payout the existing vested sick leave, and discontinue the existing sick leave credit benefit plan. However the questiun is whether the Ministry of Natural Resources will fund their portion of any payout formula developed by M.T.R.C.A. Similarly the establishment of a reserve or reserve fund on any reasonable basis is predicted on the WIllingness of the Ministry of Natural Resources to fund on a basis other than actual payments. It is understood that the Ministry of Natural Resources, in the past, has not agreed to the Reserve concept for grant purposes. SUGGESTED DIRECTIONS 1. Funding: Since the problem is probably Province wide in nature, the medium of the Chairman's Committee could initially be used to approach the Ministry of Natural Resources in developing a solution where funding for a reserve would be provided. 2. Benefits: Staff believes that the financial resources allocated to benefits should be directed in the following areas:- a. To the provision of a Short Term Disability Plan for all our Full Time employees and that the period of coverage be provided until the Long Term Disability Plan takes effect and that such plan continue to be self administered. b. That the level of coverage on the Long Term Disability Plan be increased to reflect the financial needs of staff at times of Long Term Disability. c. That a separate plan for occasional sickneSs be developed and that such plan retain the feature of accumulation and short term payout. d. Present employees of the M.T.R.C.A. have joined the Authority on a basis of an existing benefit plan which provides a substantial financial benefit. Consequently, changes to the level of accumulation should be offset with another benefit program. Consideration could be given to a dental plan which would round out the M,T.R.C.A, benefit plan and bring it in line with other organizations of similar size. B-436 3. In Conclusion: The Staff believes that the Sick Leave Credit benefit plan should be reviewed on the basis of the total benefit package and the task undertaken in conjunction with the recommendation in Meeting #5/79 of the Management Study Review Sub-Committee that: "The Secretary-Treasurer be directed to review the manner in which the Authority remunerates ,all of its staff, inclusive of fringe benefits and to make recommendations as required for revision to the compensation plan." :jh 1979.11.21 :=437 APPENDIX 4 <& the metropolitan torohto and rcg'.m conservation authority PACE' E-13 Personnel Manual EXEOJTIVE N! (?7 Employee Benefits DATE: , Vacation Credits RESOLUTION N! 1) Vacation credits accumulate as fol10ws:- . Up to one year of service - 1 day for each full month . 2 to 5 years of service - l~ days for each full month . 6 to 14 years of service - 1% days for each full month . 15 to 19 years of service - 1 3/4 days for each full month . 20 years and over - 2 days for each full month 2) Employees shall be allowed to accumulate up to a maximum of the vacation credits earned in anyone year and shall only exceed this maximuc with the approval of the Secretary-Treasurer. 3) Vacation credits shall be calculated from the individuals anniversary date and shall be based on each full month of service. FINANCE DIVISION Administrator of Finance (C. L. 10) Senior Secretary (C.L. 4) Supervisor Supervisor Supervisor Accounting Personnel Budget Control Services Services (C. L. 6) (C. L. 7) (C.L. 5) I I I I I lssistant Accounting Accounting Accounting Accounting lccountant Assistant Assistant Assistant Assistant :C.L. 4) (Claims & (Payables) (General) (Payroll) Invoicing) (C. L. 3) (C.L. 3) (C.L. 2) (C. L. 3) > "" "" m z c .... >< CJ1 - lD - tI' I .. w ;~439 APPENDIX 5 (b) UlVISION: Finance rAl:n: K-6 roS"'IO~ : Supervisor, Budget Control UJ:CUTJVI; , DATE: CL^SS. LI:V!:L: 6 RESOLUTION . TERMS OF REFERENCE To be responsible to the Administrator of Finance for:- - co-ordination of preparation of all annual and multi-year budgets - development of budget procedures and budget control procedures - co-ordinating any budget revisions through the necessary procedures - analysis of cause and effect of budget revisions on the annual budget - monthly report and analysis of monthly financial statement and variances with budgets - analysis of Divisional quarterly reports and projected year-end results - the performance of other related duties as assigned. . QUALIFICATIONS & EXPERIENCE .! - 'a thorough knowledge of accounting principles and practices - an ability to work effectively with other persons - proven analytical ability B-44 APPENDIX 5 (c) IJIVISlmJ: Fi~ance rAm! : K-8 I'OSIT IO~: Assistant Accountant I!XHCUn VI; , - MTli: ClASS. LEVU: 4 IU!SOLUTI ON " TERMS OF REFERENCE_ - assist Supervisor of Accounting Services with preparation of financial statements - assist in preparation of vehicle and equipment records per- taining to acquisition, usage and depreciation - reconciliation of accounts receivable and accounts payable - analysis of suspense accounts and others as required - operation of Authority's nechanized accounting system - assist in scheduling machine time on Authority's accounting system - performance of other related duties as assigned by the Supervisor, Accounting Services QUALIFICATIONS & EXPERIENCE - a sound under~tanJLng of ac~ounting principles and practices - experience on mechanized accounting system - an ability to work effectively with other person~ . " III ,e. ,e. ~ WATER RESOURCE DIVISION Administrator, \"at er Resource Division (C.L. 10) Senior Secretary (C.L. 4) Head, Project Project Head, Flood Control Planner Biologist Waterfront Section (C.L. 7) (C.L. 7) Section (C.L. 8) (C.L. 8) )raft ing (C. L. 4) I Secretary (C.L. 3) Drafting (C.L. 4) I Secretary (C.L. 3) I I Project Project Maintenance Project Engineer & Operations Engineer Development Engineer - Supervisor Development (C.L. 7) Hydrology (C.L. 6) (C.L. 7) I (C. L. 7) I Development > Technician I I "C "'0 (C.L. S) m Dam Operators Engineer, Development Landfill z c::; (C.L. SA) Shoreline Supervisor Supervisor - >< Management (C.L. 6) (C.L. 6) C\ (C . L. 6 ) '" Assistant !l) Development '-" Technician Biological (C. L. 4) Techn ician (C.L. 4) B-442 - _APPENDIX 6(b) IUVISION: WATER RESOURCE rM:t:: P-ll ..------ ---- - -------- ''05 J1 ION: PROJECT ENGINEER- HYDROLOGY um:u rJ VI: . MH: CV.SS. LEV 1:1.: 7 RJ:SULUTI ON . TERMS OF REFERENCE Responsible to the Head of the Section and to take responsibility for: - the development and operation of the Authority's Flood Warning System - the development and operation of the Authority's Hydrologic and computer models for the provision of technical information to Authority staff and other agencies, developers, and municipalities - the provision of technical assistance to the Authority's planning and development control staff relat~ng to the Authority's regulations - liason with municipal and provincial staff in the development of the Authority's flood warning and forecasting system - the assisting of liason and co-ordination with contractors and consultants carryinq out Authority projects necessary for the administration of the Authority's regulations such as mapping, computer modeling, hydrologic studies - assist in the preparation of tenders, quotations and specifications for materials, studies, mapping, equipment required for the administration of the Authority's regulations and flood warning system . - performance of other related duties as required. : QUALIFICATIONS & EXPERIENCE - knowledge of the principles and practices of civil engineering design and methods - good knowledge of hydrology and meteorology - working knowledge of various hydrologic and hydraulic computer models - knowledge of planning process relating to subdivision control - ability to work closely with staff of other Authority Divisions Government Agenc~es, private developers, and general public - eligible for membership in the Association of Professional Engineers of the Province of Ontario -, at I .c. INFO~~TION & EDUCATION DIVISION .c. w Administrator Information 5 Education (C.L. 10) Senior Secretary (C.L. 4) Head. Conservation Head, Conservation Information Section Education Section (C. L. 8) (C.L. 8) I I I Secretary (C.L. 3) Cons. Ed. Supervisor(s) Cons. Ed. Supervisor Program Cons. Field Centres Kortright Centre for Co-Ordinator (C.L. 7A) Conservation (C.L. 7A) B.C.P.V. Conservation I Infonnation Co-Ordinator Secretary Educational (C. L. 5) (C.L. 3) Assistants I I Project Clerk Curator Superintendent Technician Co-Ordinator(s) (C.L. 2) (C.L. 7A) (C. L. SA) (C. L. 2) (C. L. 6) , I I , , I Exhibit Program Building Lead Hand Instructor(s) Designer Co-Ordinator Manager II (C.L. 4) (C.L. 4 & 5) (C.L. 5) (C.L. 5) (C.L. S) J I I I Residential Part Time Educational L Labourers Assistant (s) Staff Assistants > ~ (C. L. 3A) ~ z I c - >< Building --.J ~Ianager(s) ,.... p) (C. L. 4) ....... I Educational Assistants B-44 . APPENDIX 7 (b) DIVISION: Information and Education PAGE: POSITION: Conservation Education Supervisor EXECUTIVE , (Kortright Centre for Conservation) DATE: CLASS. LEVEL: 7A RESOLUTION , TERMS OF REFERENCE: To take responsibility for: - the management and operation of the Kortright Centre - public relations, promotion and marketing - engaging and training staff - developing and coordinating long and short-term work schedules to carry out operations and maintenance, development and research - researching and developing a merchandise sales outlet - researching and developing a food service related to the program - developing special group use markets - preparing budgets and setting priorities and monthly analyses - providing product reports - developing policy recommendations to guide the operations and development of the Centre - assisting the Foundation and Senior Authority Officials in seeking support for the Centre - identifying the need for and the role of volunteers - individuals, groups, associations and members of. the Kortright Centre for Conservation - the performance of other related duties as assigned OUALIFICATIONS AND EXPERIENCE - proven management ability - experience in teaching and/or conservation, preferably both - able to maintain budget control - ability to work effectively with others in related and unrelated disciplines - fondness for outdoor life and natural sciences - background in public relations, promotion and marketing B-445 APPENDIX 7 (C) DIVISION: Information and Education PAGE: M-6 POSITION: Conservation Education Supervisor EXECUTIVE,12/79 (Field Centres) DATE: Aug. 15/79 CLASS. LEVEL: 7A RESOLUTION' 317 TERMS OF REFERENCE To take responsibility for:- _ the operation of one or more conservation education projects and for instruction as required by the approved Authority program _ the instruction of all visiting students, including school classes, adult groups, various youth groups and Conservation area visitors _ the counselling and preparing reports on student teachers _ the supervision and delegation of duties to those staff members which may be assigned by the Authority to the project or proj ects _ assisting the Administrator of the Information and Education Division in preparing budget estimates _ the pre-planning of teachers and classes, student teachers and other groups in preparation of their attendance at the project _ the descipline of students with the assistance and co-operation of the visiting teacher or group leader _ the development of all programs related to the pro}ect, as may be determined by the Authority policy _ the performance of other related duties as assigned QUALIFICATIONS & EXPERIENCE _ experience in teaching or conservation, preferably both _ an ability to teach out-of-doors and in the laboratory _ an ability to present the Authority program to adult groups and educational personnel _ an ability to work effectively with other persons in related and unrelated disciplines' COOSERlJATICN U\ND MANAGE11ENT DIVISICN Administra tor, Conservation Land Management Division (C.L. 10) Senior Secretary (C.L. 4) Superintendent Supervisor of Planner of Operations Conservation (C.L. 6) (C.L. 7) Services (C.L. 6) Administrative Safety Officer Technician Assistant (C.L. 5) Planning (C.L. 4) (C.L. 5) Conservation Services Technician Regional Regional (C.L. 5) Draftsnan Superintendent(s) Superintendent (s) (C.L. 4) (C.L. 6) Cen tral Services (C.L. 6) I Conservation Area Stockroom > Superintendent(s) Manager -0 -0 (C.L. 5 & SA) (C.L. 4) en z c .... >< 00 -. p:l ....., tJJ I .. .. 0\ B-447 -- - 4P.PENDIX 8 (b) IIIV'S'ON: Conservation Land t1anagement r AC:J; : 0-12 -- - ---- l'OS'nON: I!UCU rJ VI: 4 19/78 Con~ervation ~rvices Technician PAl';: Dec. 6/78 CLASS. LEVU. : 5 RESOLUTION' 495 TERMS OF REFERENCE To take responsibility for: - co-ordinate field studies related to Conservation Land Management programs and Private Land Assistance programs; - co-ordinate Land Use Planning programs; - prepare detailed plans related to Conservation Services section~ - co-ordinate pond serv~ces program: - prepare technical reports and maintain records: - carry out site visits related to Private Land Assistance Programs; - report to Supervisor of Conservation Services: - preparation of tenders for material and equipment. OUALIFICATIONS AND EXPERIENCE - a knowledge of conservation practices related to Conservation Land Management Programs and Private Land Assistance Programs; - an abiliry to wor~ eff~~tively with other persons in related and unrelated disciplines: - an abili ty in landscape des~gn; - an ability to deal with the public in a knowledgeable:and courteous manner. APPENDIX 9 B-44 8 TO: The Chairman and Members of the Personnel Sub-Committe, M.T.R.C.A. Meeting #6/79 - Wednesday, November' 28, 1979 FROM: G. Dudar, Administrator, Finance Division RE: Appointments, Transfers and/or Promotions to the Full Time and Full Time Probationary Staff IT IS RECOMMENDED THAT the following appointments, transfers and/or promotions be made to the Full Time and Full Time Probationary Staff:- 1) APPOINTMENTS TO THE FULL TIME PROBATIONARY STAFF Name Position Level Effective Ik,te J. Harnadek Senior Secretary 4 November 5, 1979 L. J. Barkey Secretary 3 October 3, 1979 L. M. Dillon Workroom Assistant 3 October 9, 1979 J. I. Lauritzen Secretary 3 November 19, 1979 R. Locke Accounting Assistant 3 November 12, 1979 2) APPOINTMENTS TO THE FULL TIME STAFF Name Position Level Effective Date N. Cowey Project Engineer 6 September 26, 1979 K. Snowden Biological Technician 4 November 22, 1979 M. C. Piper Planning Technician 6 November 22, 1979 R. Hudson Conservation Education Supervisor 7A September 1, 1979 A. Patterson Residential Assistant 3A September 1, 1979 I. Ferguson Building Manager 4 September 2, 1979 C. Hayden Foundation Senior Secretary 4 January 1, 1980 L, J. Barkey Secretary 3 January 1, 1980 L. M. Dillon Wurkl'oOlll AS::..i.stdlll 3 January 1, 1980 R. Brooks Labourer November 25, 1979 P. Good Labourer November 25, 1979 M, Tyrre 11 Tradesperson November 25; 1979 3) TRANSFERS AND/OR PRO~IOTIONS WITHIN THE FULL TIME STAFF Name Position Level Effective Date J. Beedham Foreman Ski 11 ed - October 14, 1979 J. Silk Workroom Assistant 3 June 11, 1979 J. Silk Receptionist 3 October IS, 1979 M. Miller Assistant Accountant 4 October 14, 1979 M. Yates Accounting Assistant 3 October 14, 1979 P. George Co-Ordinator, Work Room 3 January I, 1979 G. Kidd Superintendent SA October 28, 1979 R. Gilchrist Assistant Superintendent- October 28, 1979 H. McIntosh Assistant Superintendent- October 28, 1979 D. Whelan Lead HUJ'd - October 28, 1979 R F. Baxter Lead Hand - October 28, 1979 G. Misumi Skilled Labour - January I, 1980 G. Wilkins Skilled Labour - January 1, 1980 A. J. Lamers Nursery Supervisor - January 1, 1980 F. Casey Foreman - January 1, 1980 A. Vernest Foreman - Skilled - January 1, 1980 M. Hesp Registrar 4 January 1, 1980 D. Harris Artisan - January 1, 1980 ~ B-449 , the metropolitan toronto and region conservation authority minutes Report 119/79 EXECUTIVE COMMITTEE WEDNESDAY-DECEMBER-19-l979 119/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, December 20, 1979, commencing at 10:00 a.m. PRESENT WERE Chairman R. Grant Henderson Vice Chairman Mrs. F. Gell Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Finance Division G. Dudar Adm. - Conservation Land Management Division P.B. Flood. Adm. - Water Resource Division M.R. Garrett Research Plannt:r, Planning & Pulicy Mrs. A.C. Deans Development Coordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather Supervisor, Property Administration, P&AD D.J. Prince MINUTES The Minutes of Meeting #18/79 were presented. Res. isi6 Moved by: C.F. Kline Seconded by: E.V. Kolb RESOLVED THAT: The Minutes of Meeting #18/79, as presented, be adopted as if read. CARRIED: SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY. SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: l. THE METROPOLITAN TORONTO AND REGION CONSERVATION FOUNDATION -Advance of funds to The Metropolitan Toronto ,and Region Conservation Authority On behalf of The Metropolitan Toronto and Region Conservation Foundation, Mr. Card presented a cheque in the amount of $100,000.00 to Mr. R.G. Henderson, Chairman of the Authority. The cheque represents an advance to the Authority for the obligations of the Foundation in 1979. B-450 -2- Res. 1517 Moved by: Mrs. J.A. Gardner Seconded by: E.V. Kolb RESOLVED THAT: The Chairman and Members of The Metropolitan Toronto and Region Conservation Foundation be thanked for the advance in the amount of $100,000.00; and THAT the Authority acknowledge the continued support of the Foundation in the advancement of conservation projects in the Metropolitan Toronto region. CARRIED; 2. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. & Mrs. J. Jenkins To construct a gabion wall and reshape lands at rear of '9 Lakeshore Drive, Borough of Etobicoke (Waterfront) This item was withdrawn. 3. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Runnymede Development Corporation Limited To construct a parking lot on Lot 1, Concession 1, S.D.S., City of Mississauga (Etobicoke Creek Watershed) A staff communication was presented advising that an application has been received from Runnymede Development Corporation Limited for permission to construct a parking lot at the above location. Res. #518 Moved by: Mrs. F. Gell Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Runnymede Development Corporation Limited, be received; and THAT the application of Runnymede Development Corporation Limited for permission to construct a parking lot in an area as defined on the Schedules appended to Ontario ReguJation 735/73, and on the flood plain of the Etobicoke Creek as defined by the Regional Storm, in Lot 1, Concession 1, S. D.S., City of Mississauga (Etobicoke Creek watershed), be approved, subject to: (a) No additional fill being introduced into the subject area, with the exception of topsoil; (b) Any fill in the area which is to be used for the parking area being removed and replaced with the exact amount of gravel and asphalt~ (c) An 8-inch concrete curb barrier being installed along the outer perimeter of the parking area; (d) The appropriate number of trees and shrubs being planted along the common boundary line between the parking area and the valley; (e) The landscaping plans being subject to a detailed plan which shall indicate the size and location of all trees and shrubs; ( f) The Authority reviewing and approving the storm drainage plans for the site ~ (g) No earth berms of any kind being created across and/or parallel to the valley flood plain; :(h) The valley lands between the proposed pa~king area and the river being landscaped to the satisfaction of the Authority; (i) The final limit between the Open Space zone and the site development being determined by the Authority in conjunction with the City of Mississauga. CARRIED; -3- B-451 4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Sheridan Chevrolet-Oldsmobile Limited To construct a building and associated parking lot on Part Lot 18, Concession 1 (#1800 Kingston Road) , Town of Pickering (Duffin Creek Watershed) A staff communication was presented 'advising that an application has been received from Sheridan Chevrolet-Oldsmobile Limited for permission to con- struct a concrete block service building and associated parking at the above location. Res. #519 Moved by: C. F. Kline Seconded by: Mrs. L. Hancey RESOLVED THAT: The staff communication, together with.the application of Sheridan Chevrolet-Oldsmobile Limited, be received; and THAT the application of Sheridan Chevrolet-Oldsmobile Limited for permission to construct a building and associated parking lot on Part of Lot 18, Concession 1, also known as #1800 Kingston Road, in the Town of Pickering (Duffin Creek Watershed), be approved, subject to: .All work being completed in accordance with the Landscape Plan, Drawing No. L-l, Project No. 79-52, as prepared by Landscape Planning Limited, which forms part of the permit. CARRIED, 5. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. Walter Vincent To construct two dwellings and place fill on Lot 30, Concession 1 (1148 John Street) , Town of Markham (Don River Watershed) A staff communication was presented advising that an application has been received from Mr. Walter Vincent for permission to construct two dwellings and place fill at the above location. Res. 1520 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOL VED THAT: The staff communication, together with the application of Mr. Walter Vincent, be received; and THAT the application of Mr. Walter Vincent for permission to construct two dwellings and to place fill in the area regulated in accordance with Ontario Regulation 735/73, on Lot 30, Concession 1, known as '148 John Street, Town of Markham (Don River watershed) , be approved, subject to: (a) All filling and grading being undertaken in accordance with Drawing No. 620-301, dated October 19, 1979, and prepared by R.R. Higgins & Associates Limited~ (b) Section B-B on the plan submitted being amended so that the newly-created side slopes shall have a 3 horizontal to 1 vertical slope~ (c) All filling taking place within the property limits, as indicated on the plan submitted~ (d) All disturbed areas being sodded upon completion of the proposed dwellings; (e) A snow fence being erected across the common lot line between the two residential lots and the park land; ( f) Every effort being made to minimize silting of the river during construction; (g) All works being completed to the satisfaction of the Authority and of the Town of Markham. CARRIED; B-452 -4- 6. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Town of Caledon To install temporary Bailey bridge on Sixth Concession Road, Lot 12, Concession 5, former Township of Albion, Town of Caledon (Humber River Watershed) A ,staff communication was presented advising that an application has been received from the Town of Caledon for permission to undertake the above- noted proposal. Res. #521 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the Town of Caledon, be received; and THAT the application of the Town of Caledon for permission to install a temporary Bailey bridge on the Sixth Concession Road, Lot 12, Concession 5, former Township of Albion, Town of Caledon (Humber River watershed), be approved, subject to: (a) The Bailey bridge being at the same elevation as the original bridge~ (b) Spill zones being protected on either side of the proposed bridge; (c) All works being completed to the satisfaction of the Authority~ (d) Every effort being made to minimize silting of the river during construction; CARRIED; 7. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 City of Mississauga Parks Department To construct a footbridge over drainage ditch, north- east of Goreway and Etude Drives, City of Mississauga (Mimico Creek) A staff communication was presented advising that an application has been received from the City of Mississauga Parks Department for permission to construct a footbridge over a ditch which drains the parking lot of the Westwood Mall at the above location. Res. 1522 Moved by: C.F. Kline Seconded by: Mrs. F. Gell RESOLVED THAT: The staff communication, together with the application of the City of Mississauga Parks Department, be received~ and THAT the application of the City of Mississauga Parks Department for permission to construct a footbridge over a drainage ditch on Lot 12, Concession VIII, S.D., (Mimico Creek Watershed) be approved, subject to: (a) All work being done in accordance with the plan prepared by the City of Mississauga Recreation and Parks Department, Drawing 115, Park No. 90, dated November 1979~ (b) Any excess fill or excavated material being removed from the site immediately after completion of construction~ (c) Every effort being made to minimize erosion and siltation during construction. CARRIED; 8. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Ministry of the Environment To construct a portion of the York/Durham Sewage Works in the valley of the German Mills Creek, Lots 38-42, Concession 1, E.Y.S., Town of Richmond Hill (Don River Watershed) A staff communication was presented advising that an application has been received from the Ministry of the Environment for permission to construct a trunk sanitary sewer in the valley of the German Mills Creek at the above location. "-5- B-453 Res. 1523 Moved by: Mrs. L. Hancey Seconded by: E.V. Kolb RESOLVED THAT: The staff communication, together with the application of the Ministry of the Environment, be received~ and THAT the application of the Ministry of the Environment for permission to undertake construction of a section of the York/Durham Sewage System along German Mills Creek on Lots 38 to 42, Concession 1, E.Y.S., Town of Richmond Hill (Don River watershed), be approved, subject to: (a) All gabion and rip rap being preceded by a, filter mat or layer of crushed stone; (b) Every effort being made to minimize erosion anq siltation during construction; (c) All areas disturbed during construction being restored to the satisfaction of the Authority. CARRIED; 9. WATERFRONT PROJECT 1977-1981 -Property: The Ministry of the Environment Res. 1524 Moved by: M.J. Breen Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The Report (December 4, 1979) set forth herein, received from the Property Administrator, be adopted and that the Secretary-Treasurer be authorized and directed to complete the purchase. CARRIED; -Re: Project: Waterfront Project 1977-1981 Pickering/Ajax Sector Authority: Executive Resolution No. 460, Meeting '23 - January 21, 1976 and Authority Resolution No.46, Meeting #3 - April 9, 1976 Subject Property: West side of West Shore Boulevard Owne r: Ministry of the Environment Area to be Acquired: 0.180 acres, more or less Recommended Purchase Price: $14,880.00 "Included in the requirements for the above-noted project is a rectangular- shaped parcel of land, being all of Lot 6, Registered Plan 270, Town of Pickering, The Regional Municipality of Durham, having a frontage of 50 feet, more or less, on the west side of West Shore Boulevard, south of Surf Avenue, in the Frenchman Bay area. "Negotiations have been conducted 'with officials of the Ministry of the Environment and their representatives and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as ,follows: The purchase price is to be $14,880.00, with date of completing the transaction to be as soon'as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the pur9hase. All reasonable expense incurred incidental to the closing, for land transfer tax, legal costs and disbursements, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "Funds are available. ' "An application has been made to the Ministry of Natural Resources for an Inspection Certificate. a ' B-454 -'6- 10. CITY OF NORTH YORK -Request for reconveyance of land A staff communication was presented advising that a request has' been received from the City of North York for the reconveyance of a small portion of a larger parcel which was conveyed to the Authority on August 16, 1974. Res. #525 Moved by: E.V. Kolb Seconded by: E.H. Card RESOLVED THAT: A parcel of Authority-owned land, containing 0.158 acres, more or less, be reconveyed to the City of North York. Said land being composed of Part of Block "A", Registered Plan M-1426, City of North York (The Municipality of Metropolitan Toronto), designated as Part 1 on Plan 66R-11118 Consideration to be the nominal sum of $2.00, plus al..l legal, survey and other costs involved in completing this transaction~ and THAT said reconveyance be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documen ts . CARRIED; 1l. JESUIT FATHERS OF UPPER CANADA HOLDING CORPORATION -Request for release of Authority easement rights A staff communication was presented advising that the Authority obtained a flooding easement over 9.366 acres, more or less, of vacant land owned by the Jesuit Fathers of Upper Canada Holding Corporation on February 5, 1969, under Instrument No. 551225. The easement affected only a small portion of the Jesuit Fathers' total holdings at this location. Res. 11526 Moved by: Mrs. F. Gell Seconded by: Mrs. L. Hancey RESOLVED THAT: The Authority do grant, release and quit claim its interest in that portion of flooding easement acquired from the Jesuit Fathers of Upper Canada Holding Corporation on February 5, 1969, designated as that Part of Block "F" on Plan M-1724, formerly within the limits of Parts 26, 29 and 30, Plan 66R-8957, City of North York, The Municipality of Metropolitan Toronto; and THAT the appropriate Authority officials be authorized and directed to take whatever action may be required to give effect thereto, including the obtaining of necessary approvals and the execution of any documents. CARRIED; 12. FLOOD CONTROL AND WATER CONSERVATION ADVISORY BOARD -Report #4/79 Mr. Scott presented Report 114/79 of the Flood Control and Water Conservation Advisory Board. Res. 11527 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: Report #4/79 of the Flood Control and Water Conservation Advisory Board be received; and THAT Recommendations #l and i2, as set forth herein, be adopted: !! The 1980 Work Programme and the Current Priorities for Erosion Control and Slope Stabilization in Metropolitan Toronto, as appended as part of Schedule "A" of the Minutes of Meeting #4/79 of the Flood Control and Water Conservation Advisory Board, be approved. E The 1980 Work Programme and the Current Priorities for Erosion Control in The Regional Municipalities of Peel, York and Durham, as appended as part of Schedule "B" of the Minutes of Meeting #4/79 of the Flood Control and Water Conservation Advisory Board, be approved. CARRIED, -7- B-455 13. PROJECT W.C.-6l - CHANNEL IMPROVEMENTS ON THE DUFFIN CREEK IN THE TOWN OF WHITCHURCH-STOUFFVILLE -Extra Work Order #2 A staff communication was presented advising that Change Order '2 to the above contract has been received, as follows: Change Order #2 (a) Lower existing 4" diameter watermain on Somerville Street and lower existing 8" diameter watermain on Main Street, including supply and installation of cement-lined ductile iron pipe, fittings, stone bedding, thrust blocks and granular bedding . . . $10,568.00 (b) Additional materials to bring curbs and parapet ~alls to proper grade . . . 3,525.12 (c) Sawcut control joints and fill with sealer at Market Street and Burkholder Street structures (including dewatering at Burkholder Street) . . . 2,216.10 $16,309.22 Res. #528 Moved by: M.J. Breen Seconded by: J.S. Scott RESOL VED THAT: Extra Work Order #2 to the contract for Project W.C.-61 - Channel Improvements on the Duffin Creek in the' Town of Whitchurch- Stouffville, in the an~unt of $16,309.22, be approved. CARRIED; 14. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 Erosion Control Works: #35 Canyon Avenue, City of North York (Don River Watershed) -Extra Work Order #l A staff communication was presented advising that the following Change Order has been received from Chisholm, Fleming & Associates for the erosion control work contract at #35 Canyon Avenue, City of North York. Change Order #l (a) Gabion protection (37~ cubic yards) to provide 'additional bottom and slope protection . . . $ 2,625.00 (b) Additional, sodding (424 sq. yds. unpegged) to provide immediate slope protection at the upstream and downstream transition areas . . . 706.72 (c) Place 144.06 tons of 3/4-inch and 2-inch stone beneath the invert gabions to provide a filter blanket and working base . . . 353.96 $ 3,685.68 Res. #529 Moved by: C.F. Kline Seconded by: Mrs. L. Hancey RESOLVED THAT: Extra Work Order #1 to the contract for erosion control work at #35 Canyon Avenue, carried out by Gazzola Paving Limited, in the amount of $3..685.68, be approved. CARRIED~ 15. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 Proposed Major Remedial Work: Nos. 31-39 Rivercove Drive, Etobicoke (Mimico Creek Watershed) A staff communication was presented advising that the above-noted site is in the pool of major remedial work sites proposed for 1980 and is scheduled to commence early in the new year. Res. '530 Moved by: C.F. Kline Seconded by: Mrs. J .A. Gardner RESOLVED THAT: Erosion control and slope stabilization work be carried out at B-456 -8- Nos. 3l-39 Rivercove Drive at an estimated cost of $65,000.00, of which the Authority's share is $40,000.00; and THAT the benefiting owners contribute $3,400.00 towards the cost of the erosion work; and further THAT the benefiting owners contribute to the Authority that portion of the land where the proposed work will be carried out; and further THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 16. FLOOD WARNING SYSTEM -Acquisition of Weather Radar Equipment A staff communication was presented having regard to .the proposed purchase of an electroletic recorder to improve receipt of weather information through the Authority's Flood Warning System. Res. #531 Moved by: J.S. Scott Seconded by: Mrs. S. Martin RESOLVED THAT: The purchase of an electroletic recorder for receipt of weather radar images in connection with the Authority's Flood Warning System, at a cost not to exceed $3,000.00, be approved. CARRIED; 17. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Environmental Review of Flood Damage Centres A communication was presented advising that, as part of the review for the proposed Watershed Plan, staff analysis of the major flood damage centres necessitates changes to the areas studied and listed, resulting in some additional work to complete the study being carried out by the Proctor and Redfern Group. Res. #532 Moved by: Mrs. J.A. Gardner Seconded by: M.J. Breen RESOLVED THAT: An additional appropriation of $3,000.00 be approved for pay- ment to the firm Proctor & Redfern Group for the completion of the Study of Environmental Review of Flood Damage Centres; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED ~ 18. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Completion of Dormitory - Phase I A staff communication was presented advising that the Metropolitan Toronto School Board has contracted with the firm of Gord Cheney Architects, Toronto, to provide plans and specifications to increase the level of fire protection as required by the Ontario Fire Marshal for students to occupy the Lake St. George Phase I dormitory building. Plans and specifications were provided to the following contractors for quotation: Dormitory modifications, as per specifications, plus fireproof spray ceiling and joist; south wall, strap, insulate, drywall, tape; dampers in floor diffusors: Contractor Price Quoted Leonard Construction $27,455.30 Bob Wood & Sons Limited 36,212.00 Paragon Drywall Systems No bid D.M.D. Triangle Lathing No bid McKinlay Drywall Specialists No bid Lloyd Stelkley No bid Res. #533 Moved by: M.J. Breen Seconded by: E.H. Card RESOLVED THAT: The quotation of Leonard Construction for the completion of Phase I dormitory building at the Lake St. George Conservation Field Centre, -9- B-457 in the amount of $27,455.30, be accepted~ it being the lowest quotation received; and THAT the entire cost for the completion be borne by the participating school boards. CARRIED~ 19. REQUEST FOR NURSERY STOCK -Township of Norwich A staff communication was presented advising that the Authority is in receipt of a request from the Clerk of the Township of Norwich for assistance in the rehabilitation of the area adjacent to Woodstock, Ontario which suffered severe damage during the recent tornado. Res. #534 Moved by: C.F. Kline Seconded by: Mrs. F. Gell RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority assist the Township of Norwich by making ~vailable up to 100 deciduous bare root stock, 5 feet to a feet in hei9h~,.~et ~ea~ over a five-year period. CARRIED; 20. NOTICE OF MOTION The following Notice of Motion was submitted for consideration at the next regular meeting of the Executive Committee, scheduled for Wednesday, January 9, 1979: - Moved by: Mrs. J.A. Gardner Seconded by: M.J. Breen WHEREAS Regulations made by The Metropolitan Toronto and Region Conservation Authorities Act, Section III, Sub-section 10.(1), state that the Secretary-Treasurer or his substitute shall attend and record the minutes of all meetings; AND WHEREAS Section IX, Sub-section 44.(2) of the Regulations states that the Secretary-Treasurer or his designate shall attend all meetings of the Authority, its Boards and Committees and shall record or cause to be recorded Minutes or Reports of all proceedings of such meetings~ THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer be directed to continue the present practice of recording the minutes of all Committees and Sub-Committees: and THAT Resolution #515 of Executive Committee Meeting '18/79, held Wednesday, December 5, 1979, be rescinded." 2l. ADJOURNMENT On Motion, the Meeting adjourned at 11:45 a.m., December 19. R. Gran t Henderson K.G. Higgs Chairman Secretary-Treasurer " ,~ ~ B- 4 5.8 , the metropolitan toronto and region conservation authority minutes Report .20/79 EXECUTIVE COMMITTEE WEDNESDAY-JANUARY-9-l980 '20/79 -- The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, January 9, 1980, commencing at lO:OO a.m. PRESENT WERE Chairman R. Grant Henderson Vice-Chairman Mrs. F. Gell Members M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T. H . Leith Mrs. S. Martin J.S. Scott Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Finance Division G. Dudar Adm. - Water Resource Division M.R. Garrett Adm. - Property & Administration Division W.E. Jones Research Planner, Planning & Policy Mrs. A.C. ueans Development Coordinator, Planning & Policy J.W. Maletich Head, Flood Control Section, WRD J.C. Mather ABSENT WAS Member M.J. Breen MINUTES The Minutes of Meeting #19/79 were presented. Res. # 535 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: The Minutes of Meeting #l9/79, as presented, be adopted as if read. CARRIED; SECTION I THERE WERE NO ITEMS FOR CONSIDERATION BY THE AUTHORITY SECTION II THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: l. FLOOD EVENT - DECEMBER 24-25, 1979 Mr. J.C. Mather reported that during the period December 20-25, 1979, 3" to 31s- of rain fell in the region, 2" to 2~" of this amount falling over the 4 8-hour periOd of December 24-25. Due to frozen ground conditions, a significant run- off was experienced, causing all rivers within the Authority's jurisdiction to rise considerably. B-459 -2- Flooding was experienced on the Lower Don River, inundating the Bayview Extension to a depth of 2 feet; flooding in the area included the Toronto Brickyard and the Canadian National Railway tracks. This condition prevailed for approximately 4-5 hours, after which the water began to subside. Authority staff operated b~th the G. Ross Lord and the Claireville Dams, and a significant quantity,of water was stored, thereby reducing the peak flows in the 'lower parts of the watershed. The flood level on the Lower Don River was the highest recorded since Hurricane Hazel. Res. #536 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: The Executive Committee express its gratitude to the members of the staff who were on duty on Christmas Day, 1979, in response to the flood event of December 24-25, 1979. CARRIED; Res. #537 Moved by: Dr. T.H. Leith Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff be directed to confer with the appropriate public agencies to ensure that the Authority is notified of flooding occurrences that are observed by staff of pUblic agencies in the course of their duties. CARRIED; The Chairman excused himself and asked the Vice-Chairman to take the Chair. Mrs. Gell took the Chair. 2. NOTICE OF MOTION -Recording of Minutes of Committee and Sub-Committee Meetings The Notice of Motion made at Meeting #19/79, held December 19, 1979, concern- ing the recording of Minutes of Committees and Sub-Committees, was considered. Motion Moved by: E.V. Kolb Seconded by: C.F. Kline WHEREAS Regulations made by The Metropolitan Toronto and Region Conservation Authorities Act, Section III, Sub-section lO.(l), state that the Secretary- Treasurer or his substitute shall attend and record the minutes of all meetings; AND WHEREAS Section IX, Sub-section 44.(2) of the Regulations states that the Secretary-Treasurer or his designate shall attend all meetings of the Authority, its Boards and Committees and shall record or cause to be recorded Minutes or Reports of all proceedings of such meetings; THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer be directed to continue the present practice of recording the minutes of all Committees and Sub- Committees; and THAT Resolution #515 of Executive Committee Meeting '18/79, held Wednesday, December 5, 1979, be rescinded. Amendment Moved by: Mrs. L. Hancey --------- Seconded by: J.S. Scott RESOLVED THAT: The third paragraph of the above Motion, reading: -THEREFORE BE IT RESOLVED THAT the Secretary-Treasurer be directed to continue the present practice of recording the minutes of all Committees and Sub- Commi t tees; " be deleted. -3- B-460 On a recorded vote - voting "YEA" - 7 Voting -NAY- - 3 Mrs. F. Gell M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey Dr. T.H. Leith C.F. Kline E.V,. Kolb Mrs. S. Martin J.S. Scott THE AMENDMENT WAS -------------------------------------------------- CARRIED~ Further Amendment Moved by: J.S. Scott Seconded by: C.F. Kline RESOLVED THAT: The fourth paragraph of the Motion be amended to read: "THAT Resolution #515 of Executive Committee Meeting #18/79, held Wednesday, December 5, 1979, be rescinded as it is redundant. " On a recorded vote - voting "YEA" - 8 Voting -NAY" - 2 Mrs. F. Gell M.W.H. Biggar E.H. Card Mrs. J .A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Le i th Mrs. S. Martin J.S. Scott THE AMENDMENT WAS -------------------------------------------------- CARRIED~ Res. #538 Moved by: E.V. Kolb Seconded by: C.F. Kline RESOLVED THAT: The motion, as amended, and which reads as follows: WHEREAS Regulations made by The Metropolitan Toronto and Region Conservation Authorities Act, Section III, Sub-section 10. (1) , state that the Secretary- Treasurer or his substitute shall attend and record the minutes of all meetings; AND WHEREAS Section IX, Sub-section 44. (2) of the Regulations states that the Secretary-Treasurer or his designate shall attend all meetings of the Authority, its Boards and Committees and shall record or cause to be recorded Minutes or Reports of all proceedings of such meetings; THEREFORE BE IT RESOLVED THAT Resolution #515 of Executive Committee Meeting U8/79, held WedneSday, December 5, 1979, be rescinded as it is redundant." -be approved. On a recorded vote - voting "YEA" - 8 Voting -NAY" - 2 Mrs. F. Gell M.W.H. Biggar E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Lei th Mrs. S. Martin J.S. Scott THE MOTION, AS AMENDED, WAS ---------------------------------------- CARRIED; Mr. Henderson resumed the Chair. 3. FINANCIAL REPORT AND ACCOUNTS -November, 1979 Mr. Scott presented the Financial Report and Accounts for the month of November, 1979. B-46l -4- Res. i539 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Financial Statement for the month of November, 1979, be received~ and that the payment of the Authority accounts, in the amount of $1,00B,042.76, being (a) Current Expenditures - Wages & Salaries $250,635.79~ Materials & Supplies' $249,327.88; (b) Capital Expenditures - Wages & Salaries $34,422.43; Materials & Supplies $445,225.79; and (c) Other Programs - Wages & Salaries $7,6B9.Bl~ Materials & Supplies $20,741.06, be approved. CARRIED, 4. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. Submarine Limited To renovate the interior of existing building, new exterior wall treatment and pave existing parking lot, Lot 23, Plan BOL-9, Town of Caledon (Humber River Watershed) A staff communication was presented advising that an application has been received from Mr. Submarine Limited for permission to renovate the interior of an existing building, provide exterior wall treatment and pave an existing gravel parking lot at the above location. Res. #5~O Moved by: E.V. Kolb Seconded by: Mrs. F. Gell RESOLVED THAT: The staff communication, together with the application of Mr. Submarine Limited, be received; and THAT the application of Mr. Submarine Limited for permission to renovate the interior of an existing building, provide new exterior wall treatment and pave an existing parking lot on Lot 23, Plan BOL-9 (Humber River watershed), be approved, subject to: (a) No fill being introduced to the site; (b) The applicant complying with all municipal regulations and by-laws; (c) Sheet #1 of the plan drawn by Mr. Submarine Limited for Store '229 forming part of the permit. CA~ED; . 5. EXCHANGE OF LANDS -M.T.R.C.A. -&- Martin & Kathleen Gray A communication was presented advising that the Authority has received a request from Martin & Kathleen Gray to enter into an exchange of lands to straighten and legalize existing property boundaries. The Metropolitan Toronto Parks Department and the Authority's technical staff have reviewed the parcels included in the proposed exchange, and are in agree- ment that the exchange would be mutually beneficial to the Authority and to Martin & Kathleen Gray. Res. #541 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: Martin & Kathleen Gray convey to the Authority a parcel of land containing 0.035 acres, more or less, being Part of Lot 1, Plan M-786, City of North York, The Municipality of Metropolitan Toronto, in exchange for two parcels of Authority-owned lands containing a total of 0.031 acres, more or less, being Parts of Lots lB and 19, Concession II, E.Y.S., City of North York, The Municipality of Metropolitan Toronto. The exchange is to be for the nominal consideration of $2.00, with Martin & Kathleen Gray to be responsible for payment of survey and their legal costs involved in the completion of this exchange of lands; and THAT said exchange be subject to an Order-in-Council being issued in accordance with Section 20(c) of The Conservation Authorities Act, R.S.O. 1970, Chapter 78 as amended; AND FURTHER THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. ~ED, -5- B-462 6. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Property: 379407 Ontario Limited West of road allowance between Concessions IX & X, Town of Vaughan (Nashville Area) Res. #542 Moved by: M.W.H. Biggar Seconded by: C.F. Kline RESOLVED THAT: The Report (December 18, 1979) set forth herein, received from the Property & Administration Administrator, be adopted and that the Secretary- Treasurer be authorized and directed to complete the purchase. CARRIED 1 "Re: Project: In terim Wa ter & Related Land Management Project 1979-198l - Flood Plain and Valley Land Acquisition Component: Humber River Watershed Authority: Executive Resolution #133, Meeting #4 - April 12, 1978 and Authority Resolution #5l, Meeting #3 - April 2l, 1978 Subject Property: West of Road Allowance between Concessions IX & X Owner: 379407 Ontario Limited Area to be acquired: 8.663 acres, more or less Recomrneded Purchase Nominal consideration of #2.00, plus vendor's legal Price: costs and the construction of a post and wire fence on the northerly property boundary "Included in the requirements for the above-noted project is an irregularly- shaped parcel of land, being Part of Lot l, Concession X, Town of Vaughan, formerly Township of King, The Regional Municipality of York, located in the Nashville area. "Negotiations have been conducted with the officials of 379407 Ontario Limited and their solicitor, Mr. Joseph Abramsky, 943 St. Clair Avenue West, Toronto, M6C lC7; and, subject to the approval of your Committee, agreement has been reached with respect to a purchase price, as follows: The purchase price is to be the nominal consideration of $2.00, plus vendor's legal costs and the construction of a post and wire fence on the northerly property boundary, with the transaction to be completed as soon as possible. "I recommend approval of this purchase and that the legal firm of Gardiner, Roberts be instructed to complete the purchase. All reasonable expenses in- curred incidental to the closing, for land transfer tax, legal costs and dis- bursemen ts, are to be paid. The Authority is to receive a conveyance of the land required free from encumbrance. "The Administrator of the Water Resource Division has reviewed this proposed acquisition and is in concurrence with my recommendation. "An application has been made to the Minister of Natural Resources for an Inspection Certificate." 7. BOROUGH OF YORK -Request for Permanent Easement: west of Pasadena Gardens, south of St. Mark's Road. A staff communication was presented advising that a request has been received from the Borough of York to provide a permanent easement for a storm sewer, located west of Pasadena Gardens, south of St. Mark's Road, in the Jane Street and Dundas Street West area. Res. #543 Moved by: E.V. Kolb Seconded by: Mrs. J.A. Gardner RESOLVED THAT: A permanent easement be granted to the Borough of York for a storm sewer, located west of Pasadena Gardens, south of St. Mark's Road, in the Jane Street and Dundas Street West area. Said easement affects Authority- owned land known as Part of Lot 4, Humber Range, Borough of York (The Municipality of Metropolitan Toronto) . Said land is designated as Part 2 on Plan 64R-8120. The easement to be granted for the nominal consideration of $2.00, subject to the Borough of York being responsible for carrying out and paying all legal, survey and other costs involved in the transaction; and THAT the appropriate Authority officials be authorized and directed to sign the necessary documents to give effect thereto. CARRIED; B-463 -6- 8. CANADIAN COASTAL CONFERENCE, BURLINGTON, ONT. , APRIL 22-24, 1980 -Attendance at A staff communication was presented advising that the National Research Council Associate Committee for Research on Shoreline Erosion and Sedimentation is sponsoring a Canadi~n Coastal Confe~ence at the above location April 22-24, 198'0. The programme includes a number of topics related to shoreline manage- ment and erosion control. There will also be a Short Course on Basic Nearshore Processes on April 21, 1980. The Conference Registration Fee is $50.00 a person, and the Short Course Fee is $100.00 a person. Estimated expenses for transportation and other costs would , be $50.00 a person. Res. #544 Moved by: C.F. Kline Seconded by: M.W.H. Biggar RESOLVED THAT: Mr. M.R. Garrett, Mr. B.E. Denney and Mrs. J.A. Gardner be authorized to attend the Canadian Coastal Conference in Burlington, April 22- 24, 1980; and THAT Mr. B.E. Denney be authorized to attend the Short Course on Basic Nearshore Processes in Burlington on April 21, 1980; AND FURTHER THAT their expenses in connection therewith, in the estimated amount of $400.00, be paid. CARRIED 1 9. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-l981 -Proposed Major Remedial Work: Nos.39-47 Presley Avenue, Scarborough (Don River Watershed) - Supplementary Subsurface Investigation A staff communication was presented advising that the staff is in receipt of a proposal from Geocon (1975) Limited, Consulting Geotechnical Engineers, for supplementary subsurface investigation at the above location. Res. # 545 Moved by: J.S. Scott -- Seconded by: E.H. Card RESOLVED THAT: The staff be authorized to retain the firm Geocon (1975) Limited Consulting Geotechnical Engineers, to carry out supplementary subsurface investigation at Nos. 39-47 Presley Avenue, Borough of Scarborough (Don River watershed) , at an estimated cost of $3,250.00. CARRIED; 10. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Proposed Major Remedial Work: Nos.39-47 Presley Avenue, Scarborough (Don River Watershed) - Permanent Easement - Benefiting Owners A staff communication was presented advising that, as outlined in the staff report entitled "1980 Programme - Erosion Control and Slope Stabilization in Metropolitan Toronto", which was approved by the Executive Committee at Meeting #19/79, major remedial work at the above location is scheduled to commence this year. Res. #546 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: Having regard to proposed major remedial work at Nos. 39-47 Presley Avenue, Scarborough (Don River watershed) , scheduled to be carried out in 1980, the benefiting property owners be required to provide a permanent easement to the parcel of land on which the remedial work is proposed~ and THAT the benefiting owners contribute to the Authority 120 feet at the rear of their properties. CARRIED. ll. BOARD OF TRADE GOLF & COUNTRY CLUB, TOWN OF VAUGHAN The Secretary-Treasurer advised that he had been contacted by the Board of Trade Golf and Country Club enquiring as to the Authority's interest in negotiating an agreement for the use of Authority-owned flood plain lands on -7- B-464 the Main Humber River in the Town of Vaughan for golf course purposes. Res. #547 Moved by: Mrs. L. Hancey Seconded by: E.V. Kol,b RESOLVED THAT: The s,taff be authorized to enter into discussions for the lease of flood plain lands on the Main Humber River in the Town of Vaughan to the Board of Trade of Metropolitan Toronto for golf course use, on the basis that compensation will be related to market value and that all criteria for flood plain management will be met. CARRIED; 12. CLAREMONT CONSERVATION FIELD CENTRE -Quotation: Carpeting A staff communication was presented advising that quotations have been received for the supply and installation of carpeting in the living room of the Claremont Conservation Field Centre building, and for the installation of 35 square yards of the best carpet taken from the living room in the corridor over existing underpad, as follows: Re-installation of Supplier New Carpet Old Carpet Simpson's (Contract Division) $1,116.15 $120.75 T. Eaton Company 1,l58.00 80.00 Duncan Carpet No Bid No Bid Res. #548 Moved by: E.H. Card Seconded by: M.W.H. Biggar RESOLVED THAT: The quotation received from Simpson's (Contract Division) for the supply and installation of carpeting in the living room of the Claremont Conservation Field Centre building, and for the installation of 35 square yards of the best carpet taken from the living room in the corridor over exist- ing underpad, in the amount of $1,236.90, be accepted; it being the lowest quotation received. CARRIED, 13. AMERICAN PUBLIC WORKS' ASSOCIATION WORKSHOP ON EROSION AND SEDIMENT CONTROL, TO RONTO , ONT. , JULY 7-8, 1980 -Authority Sponsorship and Coordination A staff communication was presented advising that a request has been received from Mr. R.G. Ferguson, Vice-President, Ontario Chapter of the American Public Works' Association that the Authority act as sponsoring agency and local co- ordinator for the above-noted workshop. Res. #549 Moved by: Dr: T.H. Leith Seconded by: Mrs. s. Martin RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority agree to be designated sponsoring agency for the American Public Works' Association Workshop on 'Erosion and Sediment Control', to be held in Toronto July 7-8, 1980; and THAT Mr. J.C. Mather be designated local co-ordinator on behalf of the Authority. CARRIED; 14. ADJOURNMENT On Motion, the Meeting adjourned at l2:l5 p.m., January 9. R. Grant Henderson W. A. McLean, Director of Planning & Policy Chairman Acting Secretary-Treasurer ~ B-465 , the metropolitan toronto and region conservation authority minutes Report #21/79 EXECUTIVE COMMITTEE WEDNESDAY-JANUARY-23-1980 '21/79 The Executive Committee met at the Authority Office, 5 Shoreham Drive, Downsview, on Wednesday, January 23, 1980, commencing at 10:00 a.m. PRESENT FOR THE HEARING Chairman R. Grant Henderson Vice Chairman .1rs. F. Gel! Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb Dr. T.H. Leith Mrs. S. Martin J.S. Scott Authority Member Bal Vir Singh Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Director of Finance & Administration ti.E. Jones Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Water ~esource Division M.R. Garrett Adm. - Conservation Land Management Division P.B. Flood Planning Technician, Planning & Policy Miss A. Aitken Research Planner, Planning & Policy Mrs. A.C. Deans Head - Waterfront Section, NRD B.E. Denney Planning Technician, Planning & Policy B.E. Knox Development Co-ordinator, Planning & Policy J.W. Maletich Head - Flood Control Section, WRD J.C. Mather HEARING Following the Roll Call, the meeting recessed to hold a Hearing re: Mr. Reuben Parnes Town of Markham Rouge River Watershed Miss L. Trivelli recorded the proceedings of the Hearing. PRESENT FOR THE MEETING Chairman R. Grant Henderson Vice Chairman Mrs. F. Gel! Members M.W.H. Biggar M.J. Breen E.H. Card Mrs. J.A. Gardner Mrs. L. Hancey C.F. Kline E.V. Kolb ,Dr. T.H. ..Leith Mrs. S. Martin J.S. Scott Authority Member Bal Vir Singh Secretary-Treasurer K.G. Higgs Director of Planning & Policy W.A. McLean Director of Finance & Administration W.E. Jones B-466 -2- PRESENT FOR THE ~ffiETING (Contd. ) Adm. - Information & Education Division T.E. Barber Adm. - Historical Sites Division R.K. Cooper Adm. - Conservation Land Management Division P.B. Flood Adm. - Water Resource Division M.R. Garrett Planning Technician, Planning & Policy Miss A. Aitken Head - Waterfront Section, WRD B.E. Denney Planning Technician, Planning & Policy B.E. Knox Development Co-ordinator, Planning & Policy J.W. Maletich Head - Flood Control Section, WRD J.C. Mather Supervisor, Property Administration D.J. Prince MINUTES The Minutes of Meeting #20/79 were presented. Res. #550 Moved by: E.H. Card -- Seconded by: M.W.H. Biggar RESOLVED THAT: The Minutes of Meeting #20/79, as presented, be adopted as if read. CARRIED~ SECTION I THE EXECUTIVE COMMITTEE SUBMITS THE FOLLOWING ITEMS FOR CONSIDERATION OF THE AUTHORITY AND RECOMMENDS THEIR ADOPTION: l. STATUTORY RESOLUTIONS FOR THE TWENTY-FOURTH ANNUAL MEETING OF THE AUTHORITY A draft of certain Statutory Resolutions necessary for the Annual Meeting was presented. Res. #55l Moved by: E.H. Card Seconded by: J.S. Scott RESOLVED THAT: The draft of Statutory Resolutions prepared for the Twenty- Fourth Annual Meeting of the Authority be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following Statutory Resolutions be adopted at the Twenty-Fourth Annual Meeting of the Authority, scheduled for Friday, February 1, 1980: (a) ~~ntment of Auditors THAT Clarkson, Gordon & Company be re-appointed as Auditors of the Authority for the year 1980; (b) Borrowing Resolution - 1980 WHEREAS it is necessary for The Metropolitan Toronto and Region Conservation Authority (hereinafter called 'the Authority') to borrow up to the sum of FIVE MILLION DOLLARS ($5,000,000.00) required for its purposes until payment to the Authority of any grants and of sums to be paid to the Authority by the participating municipalities designated as such under The Conservation Authorities Act, R.S.O. 1970, Chapter 78, as amended; BE IT THEREFORE RESOLVED: l. THAT the Authority may borrow from The Royal Bank of Canada or the Authority's member municipalities up to the sum of FIVE MILLION DOLLARS ($5,000,000.00) necessary for its purposes on the promissory note or notes of the Authority until payment to the Authority of any grants and of sums to be paid to the Authority by the participating municipalities at such rate of interest as the Minister of Natural Resources approves; -3- B-467 2. THAT the signing officers of the Authority are hereby authorized to execute for and on behalf of the Authority a promissory note or notes for the sum to be borrowed under paragraph numbered 1 hereof and to affix thereto the Corporate Seal of the Authority: 3. THAT the amount borrowed pursuant to this resolution, together with interest thereon at the rate approved by the Minister of Natural Resources, be a charge upon the whole of the monies received or to be received by the Authority by way of grants as and when such monies are received and of sums received or to be received by the Authority from the participating municipalities as and when such monies are received; 4. THAT the signing officers of the Authority are hereby authorized and directed to apply, in payment of the monies borrowed pursuant to this resolution, together with interest thereon at the rate approved by the Minister of Natural Resources, all monies received by the Authority by way of grants or sums received by the Authority from the participating municipalities. CARRIED~ 2. SCHEDULE OF MEETINGS - 1980-l981 The Secretary-Treasurer presented a proposed Schedule of Meetings for the Executive Committee, Advisory Boards and the Authority for the year 1980. Res. #552 Moved by: Mrs. L. Hancey Seconded by: M.W.H. Biggar RESOLVED THAT: The proposed Schedule of Meetings for 1980 be received; and THE EXECUTIVE COMMITTEE RECOMMENDS THAT: The following Schedule of Meetings be adopted for 1980: FEBRUARY FRIDAY FEBRUARY 1 2:00 P.M. AUTHORITY TWENTY-FOURTH ,ANNUAL -- -- Friday February 8 1:30 p.m. Information & Education #1 Tuesday February 12 1:30 p.m. Conservation Land Mgt. U Wednesday February 13 10:00 a.m. Executive il Friday February l5 1:30 p.m. Flood Control U FRIDAY FEB RUARY 22 2:00 P.M. AUTHORITY #2 (BUDGET) -- MARCH Wednesday March 5 10:00 a.m. Executive #2 Thursday March 6 1:30 p.m. Waterfront #l FRIDAY MARCH 7 1:30 p.m. INFORMATION SEMINAR FOR -- AUTHORITY MEMBERS REGARDING THE WATERSHED PLAN Tuesday March 11 1:30 p.m. Humber valley #l Friday March 14 1:30 p.m. Historical Sites #1 Wednesday March 19 10:00 a.m. Executive #3 Friday March 21 1:30 p.m. Etobicoke-Mimico III Wednesday March 26 1:30 p.m. Don valley il Friday March 2 8 1:30 p.m. R.D.H.P. #! APRIL Wednesday April 2 10:00 a.m. Executive i4 Wednesday April 16 10:00 a.m. Executive i5 Wednesday April 30 10:00 a.m. Executive #6 B-468 -4- MAY FRID^Y MAY 9 2:00 P.M. AUTHORITY #3 (\'lATERSHED PLAN) Wednesday Ma y 14 10:00 a.m. Executive #7 Wednesday May 28 10:00 a.m. Executive #8 JUNE Wednesday June 11 10:00 a.m. Executive #9 FRID^Y JUNE 20 10:00 A.M. AUTHORITY # 4 -- --- wednesday June 25 10:00 a.m. Executive #10 JULY Wednesday July 9 10:00 a.m. Executive #11 Wednesday July 23 10:00 a.m. Executive #12 AUGUST -- Wednesday August 6 lO:OO a.m. Executive #13 wednesday August 20 10:00 a.m. Execu ti ve # 14 SEPTEMBER -- Wednesday September 10 10:00 a.m. Executive #15 Wednesday September 24 10:00 a.m. Executive #16 OCTOBER Wednesday October 1 10:00 a.m. Executive #17 FRIDAY OCTOBER lO 2:00 P.M. AUTHORITY #5 (PRELIMINARY -- BUDGET) \'ledne sday October 15 10:00 a.m. Executive #18 Wednesday Oc tober 29 10:00 a.m. Executive #19 NOVEMBER ---- Wednesday November 12 10:00 a.m. Executive #20 Wednesday November 26 10:00 a.m. Executive #2l DECEMBER Wednesday December 10 lO:OO a.m. Executive #22 JANUARY 1981 Wednesday January 7 10:00 a.m. Executive #23 FRIDAY JANUARY 16 2:00 P.H. AUTHORITY TWENTY-FIFTH ANNUAL -- wednesday January 28 10:00 a.m. Executive #1/81 FEBRUARY 1981 FRID^Y FEB RUARY 6 2:00 P.M. AUTHORITY #2 (BUDGET) -- ANY ADDITIONAL MEETINGS REQUIRED WILL BE HELD AT THL CALL OF THE CHAIR!I'.AN CONCERNED CARRIED 1 3. THE METROPOLITAN TORONTO & REGION CONSERVATION FOUNDATION -Appointment of New Member; Re-appointment of Me~ber A communication was presented having regard to an appointment and a re- appointment to The Metropolitan Toronto and Region Conservation Foundation. Res. #553 Moved by: E.H. Card Seconded by: M.W.H. Biggar -5- B-469 RESOLVED THAT the communication having regard to the appointment of a new member and the re-appointment of a member to The Metropolitan Toronto and Region Conservation Foundation be received; and THE EXECUTIVE COMMITTEE RECOM~ffiNDS THAT: The following recommendation of the members of The Metropolitan Toronto and Region Conservation Foundation be approved: (a) That Mr. F. Collict, Vice-President - Human Resources, Allstate, be invited to become a Member of The Metropolitan Toronto and Region Conservation Foundation for a 3-year term commencing February 1, 1980~ (b) That Dr. T.H. Leith be re-appointed to the Foundation for a further three-year period, commencing April 20, 1980. CARRIED~ SECTION II - THE EXECUTIVE COMMITTEE SUBMITS FOR THE INFORMATION OF THE AUTHORITY THE FOLLOWING ACTION TAKEN ON ITEMS ADOPTED BY THE EXECUTIVE COMMITTEE: 4 . APPOINTMENT OF CHAI RMAN OF THE AUTHORITY -Mr. R. Grant Henderson A communication was presented by the Secretary-Treasurer advising that Mr. R. Grant Henderson has been re-appointed Chairman of The Metropolitan Toronto and Region Conservation Authority for a further term, expiring with the first meeting of the Authority in 1981. Res. #554 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The communication having regard to the re-appointment of the Chairman for a further term, expiring with the first meeting of the Authority in 1981, be received; and THAT the Executive Committee offer congratulations to Mr. R.G. Henderson on his re-appointment. CARRIED; 5. STAFF FINANCIAL PROGRESS REPORT -October 1 to December 31, 1979 The staff presented a Financial Progress Report for the period October 1 to December 31, 1979. Res. #555 Moved by: C.F. Kline Seconded by: E.V. Kolb RESOLVED THAT: The Staff Financial Progress Report for the period October 1 to December 3l, 1979, be received and appended as Schedule "A" of these Minutes. CARRIED; 6. PERSONNEL SUB-COMMITTEE -Report #7/79 Mrs. Hancey presented Report #7/79 of the Personnel Sub-Committee. Res. #556 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Report #7/79 of the Personnel Sub-Committee be received and appended as Schedule liB" of these Minutes; and THAT the recommendations as contained therein be approved. CARRIED 1 B-470 -6- 7. BLACK CREEK PIONEER VILLAGE BROCHURE -Quotation #80-1: Printing A staff communication was presented advising that the following quotations have been received for the printing of 150,000 copies of the Black Creek Pioneer village brochure: Graphic Realm Limited .. . $3,171.37 Consumer Graphics Inc. . . . 3,452.25 Southam Murray Printing .. . 3,713.50 C.F. Haughton Limited . . . 3,788.00 Westprint . . . 3,985.50 Northern Miner Press .. . 4,058.73 Phipps Reproductions Co. Limited .. . 4,131.71 York Litho Limited . . . 4,222.00 Yorkville Press Co. Ltd. . . . 4,245.33 JHF Productions Canada Limited .. . 4,275.00 Pro-Art Graphics Ltd. .. . 4,289.68 Davis & Henderson Limited .. . 4,335.00 Cook Printing Canada Limited . . . 4,606.50 Charters Publishing Company Limited .. . 4,780.50 Multicolor Printing Limited . . . 4,910.12 Bambrick Printing Company Limited . . . 4,950.00 Labelcraft Products Ltd. .. . 5,350.50 Com-Ad Manufacturing Company Limited .. . 5,411.63 Noble Scott Company Limited .. . 5,598.24 R B Trade Printing Service Limited .. . 6,741.21 Hawker Siddeley Graphics .. . 6,939.49 Graphic Production Services . . . 7,231. 00 Canadian Offset Co. Ltd. .. . 7,530.00 York Printing House Limited . . . 8,441.68 Efmac Printing & Graphic Services Limited .. . NOT COMPLETE Res. #557 Moved by: Dr. T.H. Leith Seconded by: C.F. Kline RESOLVED THAT: The contract for the printing and supply of 150,000 copies of the Black Creek Pioneer Village brochure be awarded to Graphic Realm Limited for the quoted sum of $3,171. 37 I including taxes. CARRIED; 8. HUMBER ARBORETUM -Progress Report The staff presented a communication received from the Chairman of the Humber Arboretum Management Committee and dated 1979.1l.13, submitted to update the four governing bodies on progress made on the project during the first 18 months of operation. Res. #558 Moved by: C.F. Kline Seconded by: Dr. T.H. Leith RESOLVED THAT: The staff communication, together with the Humber Arboretum Management Committee Progress Report dated 1979.11.13, and Master Plan Review as prepared by Johnston, Sustronk, weinstein & Associates Limited, be received; and (a) That Mr. John W. Maletich, Development Co-ordinator, Planning & Policy, continue to represent The Metropolitan Toronto and Region Conservation Authority as a member of the Humber Arboretum Management Committee~ (b) That the Master Plan Review, as prepared by Johnson, Sustronk, Weinstein & Associates Limited, be accepted in concert with the four co-operating agencies and consistent with the four-party agreement as executed in 1977; (c) That approval be granted to undertake the phase II development with funds raised from private and corporate sources, matching Wintario funds, student labour and the development funds as approved in accord- ance with the four-party agreement. CARRIED; -7- B-471 9. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 City of Mississauga ~ To replace existing storm sewer outlet on Mimico Creek with larger pipe, east of C.N.R. tracks, south of Highway #427 . ~ A staff communication was presented advising that an application has been received from the City of Mississauga for permission to replace the existing storm sewer outlet works at the above location with larg-~r pipe and re- ' , designed headwall. Res. #559 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of the City of Mississauga, be received; and THAT the application of the City of Mississauga for permission to replace an existing storm sewer outlet on Lot 8, Concession 8, City of Mississauga (Mimico Creek watershed), be approved, subject to: (a) Plans C-16836,.C-16705 and C-16835 forming part of the permit~ (b) Every effort being made to minimize silting of the creek; (c) All areas disturbed due to construction being restored to the satisfaction of the Authority. CARRIED~ 10. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Bradmore Construction Limited To construct apartment building on Part Lot 27, Concession "B", east side Albion Road, Borough of Etobicoke (Humber River Watershed) A staff communication was presented advising that an application has been received from Bradmore Construction Limited concerning proposed con- struction of an apartment building at the above location. Res. #560 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Bradmore Construction Limited, be received; and THAT the application of Bradmore Construction Limited for permission to con- struct an apartment building on Part of Lot 27, Concession "B", east side of Albion Road, Borough of Etobicoke (Humber River watershed), be approved, subject to: (a) All surplus excavated fill being removed from the site~ (b) All works being in accordance with the grading plans as prepared by E.I. Richmond Architects, Job. #7704, Sheet #1, dated November 27, 1979; (c) Every effort being made to minimize silting of the watercourse during construction; (d) All works being completed to the satisfaction of the Authority and of the Borough of Etobicoke. CARRIED; 11. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Mr. & Mrs. J. Jenkins To construct gabion wall and reshape lands at rear of #9 Lakeshore Drive, Borough of Etobicoke (Waterfront) A staff communication was presented advising that an application has been received from Mr. & Mrs. J. Jenkins for permission to construct a gabion wall and reshape the lands at the rear of #9 Lakeshore Drive, Borough of Etobicoke. Res. #561 Moved by: Mrs. L. Hancey Seconded by: E.H. Card B-472 -8- RESOLVED THAT: The staff communication, together with the application of Mr. and Mrs. J. Jenkins, be received; and THAT the application of Mr. & Mrs. J. Jenkins for permission to construct a gab ion wall and reshape lands on Lot 47, Plan 1783, Borough of Etobicoke (Humber River watershed) , be approved, subject to: (a) No fill being placed on the lakeward side of the wall; (b) Stone for gabion baskets being imported, not removed from the beach; . (c) All work being completed to the satisfaction of the Authority; (d) The alignment of the wall being such that it ties in neatly and squarely with the existing armour stone on both sides of the property and with the existing gabion basket walls on both neighbouring properties. CARRIED; 12. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 North York General Hospital To place fill on Pa~t Lots 14 & 15, Concession III, E.Y.S., south of Sheppard Avenue, east of Leslie Street, City of Nortb York (Don River Watershed) A staff communication was presented advising that a request has been received from North York General Hospital for permission to place fill and reshape a section of the valley side slope at the above location. Res. #562 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of North York General Hospital, be received; and THAT the application of North York General Hospital for permission to fill and grade a section of the valley slope on Lots l4 and l5, Concession III, E.Y.S., City of North York (Don River watershed) , be approved, SUbJect to: (a) All work being carried out in accordance with Drawing U, Project A 78-137, prepared by Deacon, Arnett, Murray and Rankin, dated Novembe r , 1979, (b) All work being carried out to the satisfaction of The Metropolitan Toronto and Region Conservation Authority. CARRIED~ 13. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 B. & J. Bouwmeister To erect dwelling on south side of East Drive, west of Kennedy Road in Unionville, Town of Markham (Rouge River Watershed) A staff communication was presented advising that an application has been received from Bernard and Johanna Bouwmeister for permission to erect a single-family dwelling at the above location. Res. #563 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Bernard and Johanna Bouwmeister, be received; and THAT the application of Bernard & Johanna Bouwmeister for permission to erect a dwelling on Part of Lots 45 and 46, Registered Plan 2926, located on the south side of East Drive, west of Kennedy Road, Unionville, Town of Markham (Rouge River watershed), be approved, subject to: (a) The proposed dwelling being erected within the building envelope outlined on the plan prepared by Black & O'Connell Limited which forms a part of the permit; ....9- B-473 (b) No openings to the dwelling being constructed below an elevation of 174.9 metres; (c) All work being carried out to the satisfaction of the Authority and of the Town of Markham. CARRIED~ 14. APPLICATION FOR PERMIT UNDER ONTARIO REGULATION 735/73 Madrid Investments Limited To regrade valley side slope and construct shopping centre and associated parking, southwest corner of Highway #7 and McCowan Road, Town of Markham (Rouge River Watershed) A staff communication was presented advising that an application has been received from Madrid Investments Limited for permission to regrade the side Slope at the above location. Res. #564 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The staff communication, together with the application of Madrid Investments Limited, be received; and THAT the application of Madrid Investments Limited for permission to regrade the valley side slope and erect a shopping centre and associated parking on Part Lot 10, Concession 6, Town of Markham (Rouge River watershed) , be approved, subject to: (a) Construction of the building and of the storm sewer outfall being under- taken in accordance with Drawing # E-144-l, as prepared by Urban Engineering Consultants and dated June 6, 1979, which forms part of the permi t. This plan shows the site plan, cross sections and details of the storm sewer outfall. (b) Grading and landscaping being undertaken in accordance with Project #79-24, Drawings L-l and L-2, as prepared by Landscape Planning Limited and dated November 28 and 29, 1979 respectively, which also form part~ of the permit; (c) All works being completed to the satisfaction of the Authority and of the Town of Markham; (d) Every effort being made to minimize the silting of the creek before, during and after construction of the sewer outfall. CARRIED; 15. EQUIPMENT RENTAL QUOTATIONS -Water Resource & Conservation Land Manaqement Divisions A staff communication was presented advising that quotations have been requested from sixteen companies for the rental of equipment used by the above-noted Divisions for carrying out their respective works programmes. Quotations have been received from seven,companies. Res. #565 Moved by: J.S. Scott Seconded by: E.H. Card RESOLVED THAT: The Water Resource and the Conservation Land Management Divisions retain the services of Sartor & Susin Limited and Mark O'Conoor for the rental of construction machinery during 1980, theirs being the two lowest quotations received; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED; 16. INTERIM WATER & RELATED LAND MANAGEMENT PROJECT 1979-1981 -Erosion Control & Slope Stabilization in The Regional Municipality of York: Proposed Remedial Work - Cedar Grove, Lot 3, Concession 10, Town of Markham (Rouge River Watershed) A staff communication was presented advising that, as outlined in the staff report enti tled "Erosion Control in the Regions of Peel, York and Durham - 1980", which was approved by the Executive Csmmittee at Meeting 119/79, B-474 -10- remedial work is proposed at the above location. Res. #566 Moved by: Mrs. J.A. Gardner Seconded by: Mrs. S. Martin RESOLVED THAT: Erosion control work be carried out in Lot 3, Concession 10, Town of Markham (Rouge River watershed) at an estimated cost of $5,000.00; and THAT the approval of the Ministry of Natural Resources be requested. CARRIED ~ 17. WATERFRONT PROJECT 1977-1981 -Scarborough Sector - Bluffers Park Waterfront Area Phase II: Bluffers Park Boating Federation - Island Interior Shorelines A staff communication was presented advising that the Bluffers Park Boating Federation and one of its member clubs, the Cathedral Bluffs Yacht Club, wish to proceed with development of the Federation Island as rapidly as possible. Res. #567 Moved by: Mrs. J.A. Gardner Seconded by: M.W.H. Biggar RESOLVED THAT: The Metropolitan Toronto and Region Conservation Authority contribute toward the cost of the vertical wall shoreline protection to be constructed by the Cathedral Bluffs Yacht Club at Bluffers Park Waterfront Area, to a maximum of $30.00 per linear foot, subject to the wall being con- structed to the satisfaction of the Authority in accordance with approved design drawings; and THAT the approval of the Province of Ontario be requested. CARRIED~ 18. DECISION OF HEARING -Mr. Rueben Parnes Town 0 f Markham Rouge River Watershed Res. #568 Moved by: Dr. T.H. Leith Seconded by: Mrs. S. Martin RESOLVED THAT: This Executive Committee confirm the decision of the Hearing held this 23rd day of January, 1980; and THAT the application of Mr. Rueben Parnes, in accordance with Ontario Regulation 735/73, for permission to place fill and erect a dwelling on Pt. Lot 20, Concession 5, R.R. #1, Unionville, Town of Markham (Rouge River watershed) , be deferred until the applicant submits to the Authority the following information: (a) a detailed plan showing the footings and foundation of the proposed single-storey residential dwelling'being submitted to the Authority; (b) detailed drainage plans being submitted to the Authority for approval~ (e) a detailed landscaping plan also being submitted. This plan shall indicate any and all trees and shrubs that have to be removed to accommodate the dwelling and the private sewage disposal system. Furthermore, this plan shall also indicate the new plant material required for slope stabilization; (d) no fill of any kind being placed beyond the westerly and southerly wall exposures of the proposed dwelling; (e) the recommendations and conditions as outlined in the soils report, as prepared by Dominion Soils Investigation Inc., being strictly adhered to; (f) the application being in compliance with all existing municipal by-laws and regulations. CARRIED; .,.11- B-475 19. PLASTIC GARBAGE BAGS -Quotation #79-62 A staff communication was presented advising that the following quotations have been received for tAe supply of 10,000 (AlA) 24" x 22" x 1.5 MIL, 10,000 (AIC) 26" x 36" x .2 MIL and 7,000 (AID) 36" x 50" x .3 MIL plastic garbage containers for use throughout the Authority's operations: Apache Plastics .. . $3,346.29 Modern \oJrapping .. . 4,055.56 Albion Industrial Hardware .. . 4,249.63 Canadian Bolt & Hook . . . 5,790.72 The above prices include Federal and provincial Sales Taxes Res. #569 Moved by: C.F. Kline Seconded by: f.~rs . L. Hancey RESOLVED THAT: The quotation received from Apache Plastics for the supply of lO,OOO plastic bags, style AlA; lO,OOO plastic bags, style A1C and 7,000 plastic bags, style A1D, in the sum of $3,346.29, including all taxes, be accepted; it being the lowest quotation received. CARRIED; 20. COLD CREEK CONSERVATION AREA -Quotation #79-63: Targets & Ammunition A staff communication was presented advising that the following quotations have been received for the supply of Clay Bird Targets and ammunition for re- sale for the programs at the Cold Creek Conservation Area: Material Searle Outdoor Cochrane Shooting Supplies Stores & Dunlop 600 cases Birds (Black) $2,454.00 $3,234.00 - 600 cases Birds (Yellow) $2,550.00 - - 70 cases 12 gauge shells $6,895.00 - $8,022.00 2 cases 20 gauge shells $ l80.00 - $ 229.00 1 case 410 gauge shells $ 90.00 - $ 115.00 2 cases .22 calibre shells $ 360.00 - $ 420.00 All prices are Sales Tax exempt Res. #570 Moved by: Mrs. L. Hancey Seconded by: E.H. Card RESOLVED THAT: The quotation received from Searle Shooting Supplies, for the supply of 1980 requirements of clay birds and ammunition at the Cold Creek Conservation Area for resale, in the sum of $l2,529.00 (Provincial Sales Tax exempt) , be accepted; it being the lowest quotation received. CARRIED; 2l. ONTARIO PARKS ASSOCIATION EDUCATIONAL CONFERENCE, HUMBER COLLEGE OF APPLIED ARTS AND TECHNOLOGY, NORTHERN CAHPUS, REXDALE, ONT., FEBRUARY 15-16, 1980 -Attendance at A staff communication was presented advising that the annual Ontario Parks Association Educational Conference is being held at Humber College of Applied Arts and Technology (Northern Campus) on February l5 and 16, 1980. The agenda includes sessions dealing with vandalism, The Occupational Health and Safety Act, staff training, revenue generation and publicity for parks. Res. #571 Moved by: M.W.H. Biggar Seconded by: J.S. Scott RESOLVED THAT: Messrs. J. D. ;,gnew, S. Bontje, W. Robinson and W.G. Mulholland be authorized to attend the untario Parks Association Annual Educational Conference to be held at Hooll_er College of Applied Arts and Technology (Northern Campus) February 1 ~ -16, 1980: and THAT their expenses, including registration fees, in a sum not to exceed $150.00, be paid. CARRIED: B-476 -12- 22. SEMINAR ON JOB ESTH1ATING AND COST ACCOUNTING FOR THE LANDSCAPING INDCSTRY, HWIDER COLLEGE OF APPLIED ARTS & 'l'ECHNOLOGY (NORTHERN CM~PUS) , REXDALE, ONT. , FEBRUARY 5 AND 12, 1980 -Attendance at A staff communication was presented advising that the Humber Arboretum is sponsoring a variety of one and two-day seminars at Humber College of Applied Arts and Technology related to the landscaping industry. A workshop on job estimating and cost accounting emphasizes proper estimating procedures as they apply to plans and programmes. Res. #572 Moved by: E.H. Card Seconded by: Mrs. L. Hancey RESOLVED THAT: Mr. Garry Misumi be authorized to attend the Seminar on Job Estimating and Cost Accounting for the Landscaping Industry, to be held at Humber College of Applied Arts and Technology, February 5 and 12, 1980; and THAT his expenses, in an amount not toexceed $40.00, be paid. CARRIED~ 23. BRAMPTON ESKER STUDY A staff communication was presented advising that correspondence has been received from the City of Brampton regarding the establishment of a working committee to study the Brampton Esker area and to "direct and oversee the process of formulating a Secondary Plan". The City has invited Authority participation on the working committee and has proposed terms of reference for the study. Res. #573 Moved by: J.S. Scott Seconded by: Dr. T.H. Leith RESOLVED THAT: The Authority accept the invitation of the City of Brampton to participat~ in a committee to study the Brampton Esker; and THAT Mr. Paul B. Flood, Administrator, Conservation Land Management Division, be designated to represent the Authority. CARRIED~ 24. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quota tions: 2 x 4's and fir plywood, Dormitory Building - Phase II A staff communication was presented advising that the following quotations have been received for the supply of 2 x 4's and fir plywood to finish the inside of the second dormitory at Lake St. George Conservation Field Centre: 2x4x8's 2x4xl6's !:i" fir pl~ 3/4" fir pl~ Lansing Lumber $0.153 $0.2035 $17.18 $23.15 Graham Lumber 0.165 0.2300 18.02 23.30 Cashway Lumber 0.170 0.2500 l8.25 25.25 ~ti.tchell Lumber 0.187 0.2600 21.38 29.42 Card Lumber 0.200 0.2400 18.00 24 .00 Res. #574 Moved by: E.H. Card Seconded by: Dr. T.H. Leith RESOLVED THAT: The quotation received from Lansing Lumber for the supply of 2x4's and fir plywood to finish the inside of the second dormitory building at the Lake St. George Conservation Field Centre, be accepted; it being the lowest quotation received. CARRIED: 25. LAKE ST. GEORGE CONSERVATION FIELD CENTRE -Quota tions: Electrical Wiring & Fixtures Dormitory Building - Phase II A staff communication was presented advising that the following quotations have been received for the supply and installation of electrical wiring and fixtures in the second dormitory at the Lake St. George Conservation Field Centre: -],3- B-477 Price Quoted Robertson Electric . . . . $5,850.00 P.S.T. Extra Regent Electric . . . . $5,366.49 P.S.T. Extra Res. #575 Moved by: Dr. T.H. Leith Seconded by: M.J. Breen RESOLVED THAT: The quotation received from Regent Electric for the supply and installation of electrical wiring and fixtures in the second dormitory at Lake St. George Conservation Field Centre, in the amount of $5,366.49, plus Provincial Sales Tax, be accepted; it being the lowest quotation received. CARRIED~ 26. COMMUNITY RELATIONS - CONSERVATION EDUCATION WORKSHOP, HOLIDAY INN, BURLINGTON, ONT., APRIL l3, 14 & 15, 1980 -Attendance at A staff communication was presented advising that the Halton Region Conservation Authority is hosting the above-noted Workshop, which will focus attention on the importance of a community relations programme for a conservation authority, and discuss practical ideas and techniques for improving the effectiveness of such a programme. Res. #576 Moved by: Mrs. L. Hancey Seconded by: Dr. T.H. Leith RESOLVED THAT: Dr. T.H. Le i th, Messrs. E.H. Card and T.E. Barber, and Miss Ann Hayhoe, be authorized to attend the Community Relations - Conservation Education Workshop to be hosted by the Halton Region Conservation Authority on April 13, 14 and 1 5 , 1980, in Burlington, Ontario; and THAT their expenses in connection therewith, in an estimated amount of $150.00 for each delegate, be paid. CARRIED~ NEW BUSINESS 27. PROPOSED AUTHORITY WATERFRONT TOUR Res. #577 Moved by: M.W.H. Biggar Seconded by: E.V. Kolb RESOLVED THAT: The staff be requested to prepare a report on the advisability of organizing a Waterfront tour in late Mayor early June, 1980 in place of the annual "Sugaring Off" event. CARRIED; 28. PROMOTION - AUTHORITY AREAS, PROGRAMMES AND FACILITIES Res. #578 Moved by: Mrs. J.A. Gardner Seconded by: M.J. Breen RESOL VED THA T: The staff be requested to investigate opportunities for promotion of the Authority's Areas, programmes and facilities, in co- operation with the member municipalities and public utilities in the area under the jurisdiction of the Authority, as part of their regular billing process. CARRIED; 29. ANNOUNCEMENTS Dr. Leith advised that Atkinson College, York University will present a series of lectures on topics of current scientific and public interest on January 30, February 5, 12 and 27, and March 4 and 11, 1980. Of interest to the Authority are the following: Wednesday, January 30: IS EVOLUTION A SCIENTIFIC THEORY? Professor T.H. Leith Atkinson College, York University Tuesday, March 11: MANAGING A METROPOLITAN WATERSHED IN THE NEXT QUARTER CENTURY Mr. M. Garrett, Water Resource Division, MTRCA B-478 -14- 30. ANNOUNCEMENTS (Contd. ) Mr. Henderson announced the inaugural meeting of the Kawartha Region Conservation Authority, which will be held at Lindsay , Ontario on February 6, 1980, at 7:30 p.m. This will be the 39th Authority in the Province. 3l. ADJOURNMENT On Motion, the meeting adjourned at 1:20 p.m., January 23. R. Grant Henderson K.G. Higgs Chairman Secretary-Treasurer SCHEDULE "An B..479 STAFF PROGRESS REPORT Property Division During the period October 1, 1979, to December 31, 1979, the Property Division completed the acquisition of 6 new properties containing 106.646 acres. The Authority also completed Settlement of Compensation on one property previously expropriated. The total acreage of lands owned by the Authority, as of December 31, 1979, is 26,598.011 acres. The total acreage acquired by the Authority during 1979 was 565.846 acres. The Property Division also carried out all of the routine administration management required in connection with Authority-owned lands, Le. agreements, easements, taxes, leases, rentals, insurance, etc. A breakdown of the properties and acreages acquired by the Authority to date is as follows: FLOOD CONTROL AND WATER CONSERVATION ETOBICOKE CREEK WATERSHED Total to date--64 properties acquired containing 442.406 acres; - 2 expropriations outstanding MIMICO CREEK WATERSHED Total to date--23 properties acquired containing 75.475 acres; HUMBER RIVER WATERSHED 3 - Property sales during period Total to date--727 properties acquired containing 8,281.830* acres; - 1 expropriation outstanding *corrected acreage DON RIVER WATERSHED Total to date--160 properties acquired containing 1,793.004 acres; - 4 expropriations outstanding HIGHLAND CREEK WATERSHED Total to date--l39 properties acquired containing 820.708 acres; ROUGE RIVER VALLEY WATERSHED Total to date--110 properties acquired containing 2,074.636 acres; DUFFIN'S CREEK WATERSHED 1 - Property settled during period containing 0.162 acres - 1 purchase Total to date--80 properties acquired containing 886.309 acres; CONSERVATION AREAS - Albion Hills Conservation Area 1 - Property sale during period Total in Area--34 properties containing 1,034.702 acres; - Black Creek Conservation Area Total in Area--7 properties containing 113.966 acres~ - Bolton Community Conservation Area Total in Area--4 properties containing 18.043 acres; B-480 - 2 - - Boyd Conservation Area Total in Area--l2 properties containing 991.090 acres; - Bruce's Mill Conservation Area Total in Area--2 properties containing 267.038 acres; - Cedar Mill Property Total in Area--l property containing 0.337 acres; - Claireville Conservation Area Total in Area--l property containing 28.1l4 acres; - Claremont Conservation Area Total in Area--5 properties containing 396.750 acres; - Cold Creek Conservation Area Total in Area--6 properties containing 467.880 acres; - Frenchman's Bay Conservation Area Total in Area--9 properties containing 49.430 acres; - Glassco Park Total in Area--l property containing 482.000 acres; - Glen Haffy Conservation Area Total in Area--ll properties containing 802.206 acres; - Greenwood Conservation Area Total in Area--l4 properties containing 680.648 acres; - Heart Lake Conservation Area 1 - Property settled during period containing 38.130 acres 1 - Purchase Total in Area--9 properties containing 418.793 acres; - Humber Trails Conservation Area Total in Area--l property containing 48.664 acres; - Oak bank Community Pond Total in Area--l property containing 9.350 acres; - Petticoat Creek Conservation Area Total in Area--l property containing l77.9l8 acres; - Lake St. George Conservation Area Total in Area--l property containing 319.250 acres; - Tam O'Shanter Conservation Area Total in Area--l property containing 118.571 acres; B-481 - 3 - FOREST AND WILDLIFE AREAS - Gibson Lake Forest and Wildlife Area Total in Area--l property containing 137.l60 acres; - Glen Major Forest and Wildlife Area Total in Area--lO properties containing 1,442.057 acres; - Goodwood Forest and Wildlife Area Total in Area--6 properties containing ~07.639 acres; - King Creek Forest and Wildlife Area Total in Area--l property containing 0.1~5 acres; - Palgrave Forest and Wildlife Area Total in Area--7 properties containing 628.432 acres; " '!~ - Peter Wright Forest and Wildlife Area ,~' (: Total in Area--l property containing 20.9~~ acres; .. AGREEMENT FOREST LANDS :~ % - Uxbridge Forest and Wildlife Area 1 ';) Total in Area--l property containing 93.00'0 acres ~ ,~ - Humber Forest Area i Total in Area--22 properties containing 1,803.165 acres~ NIAGARA ESCARPMENT LANDS Total in Area--4 properties containing 251.926 acres~ WATERFRONT PLAN - Project W.F.-l - Etobicoke Sector Total to date--6 properties acquired containing 68.616 acres; - Project W.F.-2 - Ashbridge's Bay Sector 1 - Property settled during period containing 61.152 acres 1 - Purchase Total to date--2 properties acquired containing 90.770 acres; - Project W.F.-3 - Pickering/Ajax Sector (acquisitions complete) Total to date--4 properties acquired containing 0.641 acres; - Project W.F.-3A - Pickering/Ajax Sector (Ext. No. 1) 1 - Property settled during period containing 2.160 acres 1 - Purchase Total to date--150 properties acquired containing 493.173 acres~ B-482 - 4 - - Project W.F.-4 - Scarborough Sector 3 - Properties settled during period containing 6.367 acres 2 - Purchases 1 - Expropriation settled Total to date--54 properties acquired containing 461.190 acres; SUMMARY FLOOD CONTROL AND WATER CONSERVATION October 1 to December 31, 1979 - 1 property settled containing 0.162 acres; - (1 purchase) - 3 property sales Total to date--l,303 properties acquired containing 14,374.368* acres; - 7 expropriations outstanding; *corrected acreage CONSERVATION AREAS October 1 to December 31, 1979 - 1 property settled during period containing 38.130 acres; - (1 purchase) - 1 property sale Total to date--121 properties acquired containing 6,424.750 acres~ FOREST AND WILDLIFE AREAS October 1 to December 3l, 1979 - Total to date--26 properties acquired containing 2,536.412 acres; AGREEMENT FOREST LANDS October 1 to December 3l, 1979 - Total to date--23 properties acquired containing 1,896.165 acres; . NIAGARA ESCARPMENT LANDS October 1 to December 3l, 1979 - Total to date--4 properties acquired containing 251.926 acres~ WATERFRONT PLAN October 1 to December 3l, 1979 - 5 properties settled during period containing 69.679 acres; - (4 purchases) - (1 expropriation settled) Total to date--216 properties acquired containing 1,114.390 acres~ B-483 - 5 - GRAND TOTAL OF ALL PROJECTS October 1 to December 31, 1979 - 7 properties settled containing 107.971 acres; - (6 purchases) - (1 expropriation) - 4 property sales Total to date--l,693 properties acquired containing 26,598.011 acres~ - 7 expropriations outstanding. PURCHASES AND SETTLEMENTS January 1 to December 3l, 1979 Purchases during 1979 - 42 - Expropriations outstanding December 31, 1979 - 14 - Settled during 1979 - 11 - New properties expropriated during 1979 - 4 - Expropriations outstanding at December 31, 1979 - 7 B-484 Staff Progress Report, October 1 - December 31, 1979 Historical Sites Advisory Board (1) PROGRAM (a) Registration and Artifacts During the last quarter of 1979 the Village received 21 donations con- sisting of 60 articles. Items of note include: two beautiful 1848 samplers, an early Pennsylvania German Dulcimer, a steeple clock, pewter plates, a cook stove, chairs, a cutter, several feather ticks and pillows, and a pair of portieres. A crusie lamp, a betty lamp and a shoulder yoke were acquired for the collection. Black Creek was asked to provide field placement for a student from the Museum Technology Program at Algonquin College in Ottawa. As a result, for four weeks the Registration Department received the assistance of a student whose training in textiles proved to be of great assistance in the Textile Storage project. (b) Publicity and Promotion Artifacts from the collection at Black Creek have been loaned to the Toronto Historical Board, the Art Gallery of Ontario, the North York Library and the Town of Caledon for special exhibits in those locations. In honour of the International Year of the Child, toys from the Village collection were displayed for one week in October in the Yorkdale Mall. The Village was used for several photography projects including a fash- ion layout for T.V. Times of London, England (12 million circulation), a demonstration of horsepower for an Ontario Hydro film on "Motors", some footage on early settlers working for a documentary on dieting, a Christmas baCkdrop for the CHUM/City TV Christmas Wish Campaign, the setting for an edition of C.T.V. 's "Canada A.M." on Christmas Past, and a half-hour program for French C.B.C. TV on Christmas traditions. A mid-December edition of the Aurora Banner ran a full-colour full page picture taken at Santa's Workshop in the Dalziel Barn. Various staff were interviewed on site for a one-half hour program on Christmas at Black Creek on C.K.O. radio; Mr. Cooper has been interviewed twice on the John Bradshaw Show on C.F.R.B., staff have appeared on Cable 10 T.V. in Richmond Hill, C.K.V.R. T.V. Barrie, and C.B.C. - TV News. Village staff have presented lectures to the following organizations: the North York Historical Society, Deer Park United Church, Toronto West Deanery, Club '48 Retired School Teachers, Milton Historical Society, the Museology Program at the University of Toronto, Seneca College (three times), Snelgrove Women's Institute, Markham High School night classes, and North York Kiwanis. Staff members were instructors at two Ontario Museum Association seminars and at the O.M.A. Annual Conference in Barrie. (c) Special Events During the last three months of 1979, 19 weddings were held in the Fisher- ville Church, and Half Way House was the location for 29 receptions and banquets. C.B.C. held its children's Christmas party at the Village and 1,100 attended. The 14th Annual C.F.R.B. Christmas service was taped on December 17th for broadcasting on December 25th. Village staff and livestock participated in fall festivals at Jordan and Doon Pioneer Village. On week-ends during the Christmas program, St. Philip's Lutheran Church choir and the Girl Guides of Canada volunteered their time to sing Christmas carols in the Village. (d) Building Maintenance and Construction The cabinetmaker who restores and refinishes collection furniture has been relocated in the south end of the workshop under the Dominion Carriage Works where a larger working space is available and better ventilation is provided. B-485 - 2 - Reconstruction of the Taylor Cooperage has been 90% completed. Mater- ials donated from a barn in Pickering were used to provide siding and flooring for the Cooperage. A new door into Mackenzie basement has been installed at the 'foot of the stairs to improve climate control in the textile storage area. The two portables have been re-roofed and work has almost been completed for hydro into these buildings. (e) Ground Maintenance and Development There was continued fence building and repairing throughout the Village with special attention to the area around the snack bar in an attempt to improve the appearance of that area. A large new front-end loader has been obtained which will improve Village clean-up and snow removal. All picnic tables (l02) have been removed from the Valley area to the workshop yard for repair and restaining through the winter. As a result of a blockage of a storm drain maintained by the Town of Vaughan, runoff from heavy rain caused part of the Village road under Jane and Steeles to wash out on Christmas Day. It has been filled, graded and restored to use by Village staff. Grading has been carried out to raise the ground level around the Domin- ion Carriage Works and on the east side of the Town Hall to help prevent water seeping into basement rooms. (f) Livestock The poultry population in the Village was reduced for the winter with the excess birds prepared and frozen for use in Village home demonstrations through 1980. This year it has been decided to breed one sow in an attempt to raise our own pigs for next season. The other sows have been marketed. (g) Staff Six staff members attended the Annual Conference of the Ontario Museum Association in Barrie. One staff member, J. Hughes, is president of the O.M.A. Four staff members participated in the pre-conference seminar on Museum gift shops also held in Barrie. Village staff also participate on the executive committees and as members of the Costume Society of Ontario, the Pennsylvania German Folklore Society of Ontario and the York Chapter of the Pennsylvania German Folklore Society. (2) INTERIM FINANCIAL STATEMENT - JANUARY 1 TO DECEMBER 31, 1979 (a) Operations and Maintenance Total Budget Used Appropriation Budget Variance % Expenditures 953,599 889,000 64,599 107 Revenue 829,594 750,000 79,594 III (b) Development Total Budget Used Appropriation Budget Variance , Expenditures 47,401 70,917 23,516 66 B-486 - 3 - (3) FINANCIAL COMMENTS (a) Operations and Maintenance 1979 was a successful year financially for Black Creek. Expenditures were higher than estimated, but revenues also exceeded expectation~. Attendance in 1979 was 283,255, a drop of 10,000 from the 1978 figures. This decrease can be attributed to a decline of 8,000 in school tours, the energy shortage, the economic slump and to the unseasonable December weather. The Village cit~zenship program had 421 members in 1979. The Dickson's Hill School program continues to be fully booked, and lS classes attended during the fall season. (b) Historical Sites Development The restoration of the Taylor Cooperage is nearing completion. The use of some materials donated by Runnymede Development Corporation, has helped keep costs down on this project. Work on the Sawyer's House is now progressing satisfactorily. Consider- able delays were experienced in the installation of hydro, but as soon as the heating system is completed, the restoration work can be resumed. Some work has been done on the Richmond Hill Hanse restoration, and this will continue in 1980 as funds become available. B-487 TO: The Chairman and Members of the Executive Committee - M.T.R.C.A. - Meeting #20/79 - Wednesday, January 23, 1980 FROM: G. Dudar, Administrator, Finance Division RE: Staff Report - January l, 1979 to December 31, 1979 ADMINISTRATION Budget Est. Actual Surplus Dec 31/1979 (Deficit) Expenditures: Salaries $560,150 $549,800 $10,350 Benefits 440,500 424,100 16,400 Travel & Expenses 97,500 91,800 5,700 Equipment purchase and rental 36,000 32,500 3,500 Materials & Supplies 81,500 90,200 ( 8,700 ) Rents & Utilities 77,250 84,000 ( 6,750 ) General 54,100 65,000 (10,900 ) 1,347,000 1,337,400 9,600 Revenues 70,000 56,200 (13,800 ) Net Expenditures 1,277,000 1,281,200 ( 4,200 ) OPERATIONS & MAINTENANCE - GENERAL OPERATIONS Expenditures: Flood Control Workshop 1,500 2,800 ( 1,300 ) Vehicle Suspense 5,000 5,000 - Insurance 12,000 10,300 1,700 Head Office Renovation lO,OOO 2,600 7,400 Office Cleaning 19,000 19,500 ( 500 ) Office Maintenance 32,000 39,000 ( 7,000 ) Rental Property Maintenance and Miscellaneous 32,500 32,500 - 112,000 111,700 300 Revenues . 16,500 27,000 10,500 Net Expenditures 95,500 84,700 10,800 /j 1980.01.14. B-488 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg. FROM: Mr. M. R. Garrett, Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECElo1~ER 31~ 1979 FLOOD CONTROL SECTION (1) MAINTENANCE WATER CONTROL STRUCTURES (a) PROGRESS Normal day to day maintenance was carried out on all the water control structures. This year's major maintenance program saw the completion of fencing at the Brampton Diversion Channel, the study of the Lower Humber Weirs and the cleaning of the drainage channel and construction of an access road at the Goodwood Pumping Station. (b) FINANCIAL STATEMENT TO DECEMBER 31, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec/31/7,9 $ $ $ $ , $ Maintenance 159,513.97 134.00 159,647.97 l84,000.00 86 184,000.00 (c) FINANCIAL COMMENT The maintenance program appears to be slightly under the above noted figures however, it is expected that close to the budget will be spent once the final accounting has been completed. (2) INTERIM PROJECT CURRENT - WATER CONTROL PROJECTS (a) PROGRESS The Authority completed its three-year program for the acquiSition of radio communication equipment. The Authority's system after this three-year program has comprised of: 3 Consolette Base Stations 1 Mocom 10 Base Station 20 Mocom 70 Mobiles 1 Micor Repeater 2 Local Desk Set 11 MH10 Portables 1 Duplexer The Authority also acquired a new weather radar receiving equipment. (b) FINANCIAL STATEMENT TO DECEMBER 31, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec/31/79 $ $ $ $ , $ Telemark 7,171.04 0 7,177 . 04 8,000.00 89 7,171.04 Gauges Radio System 15,766.20 0 15.766.20 15,000.00 105 15,766.20 Staff 66,022.98 0 66,022.98 65,800.00 100 66,022.98 Salaries Staff Travel 1,825.34 0 1,825.34 3,700.00 49 1,825.34 90,791.56 0 90,791.56 92,500.00 98 90,791. 56 /2 . . . . B-489 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg. FROM: Mr. M. R. Garrett, Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 Page 2 (2) (c) FINANCIAL COMMENT Except for the small over-expenditure on the radio system, the remaining items are on target. (3) INTERIM PROJECT CAPITAL (a) PROGRESS The Flood Plain Acquisition Programme continued in 1979 and completed the acquisition programme within the Village of Stouffville. Under the Flood Control Plan Review, the Authority has completed its hydrologic model study and the preparation of the new floodline maps for all of its watersheds. A Damage Centre Analysis Study was carried out and the final report is expected early in January, 1980. The Environmental Monitoring Programme continued throughout 1979 and the final report is expected early in January, 1980. (b) FINANCIAL STATEMENT TO DECEMBER 31, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec/31/79 $ $ $ $ , $ Flood Plain l,489,982.43 74.00 1,490,056.43 667,273.00 223 1,500,000.00 Acquisition Headwater l47,275.59 0 147,275.59 200,000.00 73 147,275.59 AcquiSition Damage Centre 54,745.47 0 54,745.47 75,000.00 72 55,000.00 Analysis Environmental 63,127.99 0 63,127.99 100,000.00 63 70,000.00 Monitoring Flood Control 244,542.39 103.00 244,645.39 297,000.00 82 250,000.00 Plan Review Milne Dam 11,000.00 0 11,000.00 20,450.00 51 11,000.00 Workshop 2,010,673.87 l77.00 2,010,850.87 1,359,723.00 147 2,033,275.59 (c) FINANCIAL COMMENT Except for the acquisition budget, the remaining items are relatively close to the budget allocated. This is due in part of the fact that some of the engineering studies orignally to be completed in 1979 had to be extended into 1980 thereby under-spending the 1979 budget allocation. /3.... B-490 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg. FROM: Mr. M. R. Garrett, Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 Page 3 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS Erosion Control and Slope Stabilization in Metro: ITEM LOCATION WATERSHED STATUS Major Remedial 6-14 Sulkara Court Don River Completed Work 19-45 Riverview Heights Humber River Completed 50-58 Stanwood Crescent Humber River Completed Enfield/Sunset/Jellicoe Etobicoke Completed Ave. Creek 10 Codeco Court (Phase I Don River Completed Sweeney Drive Slope Don River Completed MOdification 35 Canyon Avenue Don River Completed Minor Remedial Beechgrove Rd.- Phase II Highland Completed Work Creek 34 Restwell Crescent Don River Completed Deanewood Crescent Mimico Creek Completed Vicinity Dawes Road (2 sites) Don River Completed Twyn Rivers Rouge River Completed Glen Rouge Trailer Camp Rouge River Completed Together with the foregoing, spring revegetation was carried out at 8 sites, fall revegetation was carried out at 7 sites and maintenance work was carried out at 4 sites. Also preventative work was carried out at Nos. 3l-35 Rivercove Drive and 8-14 Bruce Farm Drive 'as an interim measure, until permanent works can be carried out in 1980. /4.... B-491 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg. FROM: Mr. M. R. Garrett, Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT Page 4 FROM JANUARY 1, 1979 ~O DECEMBER 31, 1979 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS (Cont'd) Erosion Control and Slope Stabilization in the Regions of Peel, York and Durham REGION LOCATION WATERSHED STATUS Peel Sherway Drive, Mississauga Etobicoke Creek Completed 138 King Street, Bolton Humber River Completed Wildwood Park (2 sites) Mimico Creek completed York 14th Avenue - Phase I Rouge River Completed Lots 5 & 6 Conc.a, Markham 19th Avenue Rouge River Completed Lot 30, Conc.8, Mar kham 7374 Kipling Avenue, Woodbridge Humber River Completed 7440 Kipling Avenue, woodbridge Humber River Completed 8254 Pine Valley Dr. Vicinity Humber River Completed Woodbridge Town Line, Bolton Humber River Completed Durham 558 Pine Ridg~ Road Vicinity Rouge River Completed Pickering Elizabeth Street, Ajax Duffin Creek completed I Reconstruction of Highland Creek 1979 was the third year of the three-year programme for remedial work within the Highland Creek. Work has been completed at the following sites. . LOCATION STATUS Morningside Parks Yard Completed Scarborough College - Tennis Courts Completed South of Kingston Road Bridge Completed Beechgrove (Colonel Danforth Park) Completed Watermain at Scarborough College Completed Scarborough Golf Course Completed All of the major damaged areas identified under the Highland Creek project have now been repaired and the funds allocated for this work expended. /S . . . . B-492 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, MTRCA, Mtg. FROM: Mr. M. R. Garrett, Administrator - Water Resource Division RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY l, 1979 TO DECEMBER 31, ~979 Page 5 (4) INTERIM PROJECT CAPITAL - (BENEFITING MUNICIPALITY) (a) PROGRESS (Cont'd) Stouffville Channel: The Authority completed the final engineering for the Stouffville Channel and awarded the contract in August, 1979. Approximately 95% of the contract has been completed with the remaining cleanup and restoration to be done for the Spring in 1980. Oak Ridges Study: Authority has received the preliminary engineering study for the Oak Ridges Channel Improvements and has prepared a brief for the Province of Ontario with the expectation that the final design and construction will be done in 1980. (b) FINANCIAL STATEMENT TO DECEMBER 3l, 1979 Year , of Forecast To Date Total Budget to Expend. Commitments Approp. Budget Used Dec.31/79 $ $ $ $ % $ W.C.-58 99,690.00 0 99,690.00 99,690.00 100 99,690.00 Erosion 707,643.90 29,293.00 736,936.90 800,000.00 92 750,000.00 Control Metro Erosion l26,4l6.45 493.00 126,909.45 200,000.00 63 175,000.00 Control Peel, York & Durham Highland 187,52l.03 0 l87,521.03 240,000.00 78 230,000.00 Creek Restoration Stouffville 514,561.01 17,800.00 532,361.01 395,000.00 130 550,000.00 Channel Wilket 0 0 0 10,000.00 0 0 Creek Oak Ridges 7,142.32 0 7,142.32 5,000.00 142 7,500.00 1,642,974.71 47,586.00 l,690,560.7l 1,749,690.00 97l,8l2,190.00 (c) FINANCIAL COMMENT All of the items will be on target except for the Stouffville Channel construction which will be over-expensed due to the decision to carry out all of the works in 1979. The Erosion Control Metro, the Erosion Control Peel, York and Durham and the Highland Creek Restoration programs all appear to be slightly under the budgeted figures, however, it is expected that once the final accounting has been completed, that most of the budget will be expended. 1979.01.15 JCM/fn B-493 TO: THE CHAIRMAN AND MEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. - Meeting # 21/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE SIX 1979 was a relatively successful year for waterfront development in spite of the fact that provincial approval was not received for the Supplementary Waterfront Project. Although funding was not as high as expected, it was possible to make a start on shoreline management work by delaying some site development at Humber Bay and at Bluffers. It is still possible that the supplementary project funding will be available for 1980 and 1981. COLONEL SAMUEL BOIS SMITH PARK The Master Plan was completed in 1978 and submitted to the Ministry of Natural Resources and the Ministry of the Environment. MNR approval was received early in 1979. The response from the Minister of the Environment concerning the application by the Authority for the approval of the Colonel Samuel Bois Smith Master Plan under the Environmental Assessment Act was received in September. It is the recommendation of the Minister that: " (a) The environmental assessment be accepted; and (b) The undertaking as proposed be refused approval to proceed according to the provisions of section 14 of the Act. " The Minister has also recommended that a Hearing be held before the Environmental Assessment Board. It appears that the Hearing could commence on April 14, 1980. HUMBER BAY WEST The total area created as part of the Humber Bay West project is now 64 acres. The Master' Plan shape was achieved in February 1979, at which time the landfilling operation was terminated. The Humber Bay Boating Federation had a very successful season. Approximately 460 boats were moored at the site and the waiting list has been cut off at 300. It is anticipated that the Federation will easily reach the design capacity of Humber Bay by next season and should be able to undertake the construction of some of the associated land-based facilities. Discussions were held with the Federation to finalize development priorities for 1980. The Preliminary Budget Estimates provide for interior shoreline stabilization, servicing and completion of grading. Design of these elements is underway and a final decision on the actual development program will be made pending the final budget allocation to be determined early in 1980. HUMBER BAY EAST A contract was awarded to M. A. Butt in the amount of $780,722.70 at Executive Committee Meeting #8/79 on June 13, 1979 for the construction of the park buildings, foot bridges and other site development features. Construction is 85% completed, but delays in supply of certain materials have prolonged the job by approximately two months. Completion is now scheduled for the end of February. Final landscaping will be undertaken by the Conservation Land Management Division in the spring of 1980. The major development objectives in 1980 will be the completion of land- scaping and the Baving of the entrance road and parking areas. \ Authority staff ~nstalled the liner in the pond system as well as the water supply forcemains. The pond system is now operational and is being tested. ( \ " I ) B-494 TO: THE CHAIRMAN AND MEHBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. - Meeting #21/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOORCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE SEVEN WESTERN BEACHES The Authority's involvement in this area in 1979 was restricted to the completion of a detailed Master Plan. It is planned to include some works in this area in the next Five-Year Project. The Sunnyside Pavilion continued to deteriorate and since the Authority was unable to undertake the restoration of the building, the City of Toronto initiated plans to refurbish the structure. BLUFFERS, PHASE II Fill receipts totalling approximately 300,000 cubic yards resulted in good progress being made towards the completion of the breakwater. Filling was concentrated along the breakwater between Points 8 and 9, as well as the easterly end of the island during the winter months. Federal funding of the project under the Small Craft Harbours Assist- ance Program continued. Armouring of Point 9 was completed. Stone has been purchased and stockpiled for armouring of Point 8 in 1980. The Bluffers Boating Federation successfully installed approximately 120 mooring slips. Landfilling over the winter months will concentrate on completion of sufficient land base to allow construction of approxi- mately 140 slips in 1980. Dil!!cussions have been held with the Boating Federation to finalize development priorities for 1980. The Preliminary Budget Estimates provide for interior shoreline stabilization, servicing and completion of the landfilling. The construction of the new launching ramps and day mooring docks was completed. The construction of the permanent parking lot associ- ated with the launching ramps, as well as the extension of the parking area associated with Phase I was also completed. Installation of permanent underground hydro service to the Boating Federation Island was completed early in December. AQUATIC PARK The future involvement of the Authority in the development of Aquatic Park became more probable in 1979 as the result of a project to construct a dredgate disposal area on the exposed shoreline, which will help to resolve the final armouring issue. Serious discussion related to transfer of title for the area from the province to the Authority also took place in 1979. EAST POINT Discussions will be completed early in 1980 with the Authority's consultant, Hough, Stansbury and Michalski Ltd. , in an effort to finalize the Master Plan Review and to prepare site plans. Construc- tion is expected to begin at this site upon completion of Bluffers Park. ENVIRONMENTAL MONITORING The collection of field data on water quality, sediment quality, benthos and fish populations was completed in December. A report was prepared by Authority staff and consultants which described an extensive examination of bottom conditions in the area of East Point Park (by scuba diving) . The work was done as part of the Master Plan Review. B-495 TO: THE CHAIRMAN AND HEMBERS OF THE EXECUTIVE COMMITTEE, M.T.R.C.A. - Meeting 1121/79 FROM: MR. M. R. GARRETT, ADMINISTRATOR, WATER RESOURCE DIVISION RE: WATER RESOURCE DIVISION PROGRESS REPORT FROM JANUARY 1, 1979 TO DECEMBER 31, 1979 PAGE EIGHT Environmental Monitoring (continued) The Ministries of the Environment and Natural Resources continued to raise concerns about the landfilling process. A technical committee was established consisting of representatives of the two Ministries and the Authority to review the impact of landfilling. Data collected in previous waterfront monitoring programs was extremely valuable in this process. The final report is to be prepared by March 1980. SHORELINE HANAGEMENT Preparation of a detailed Master Plan in the Scarborough sector is ongoing. Provincial approval was received to retain a consultant to examine certain soil mechanics and slope stability questions along the Scarborough Bluffs, aimed at producing recommendations on appropriate construction techniques to stabilize the bluff face after the toe of the bluffs has been protected. Construction of an offshore revetment was completed at Crescentwood Park. The work was done to protect the toe of the fill material placed by the Borough of Scarborough last fall to save portions of Crescentwood Road and underground services which were threatened. The work was carried out by rented machines under the supervision of Authority staff. The next priority is the Kingsbury-Harding area which was partially protected by a program of fill i ng by the Borough of Scarborough over the summer. Although protection of the toe of the newly formed slope is required. staff felt that substantial settlement and slides are inevitable in this area and therefore it was not safe to work in that area. Therefore, work was undertaken at the Eastern Beaches to stabilize the shoreline and provide for reconstruction of the boardwalk. This work will be substantially complete by January 31, 1980. to PRELIMINARY FINANCIAL STATEMENT TO DECEMBER 31, 1979 I ~ \0 0\ Year to Date Estimated Final Estimated Final as per Preliminary Total , of Budget Total Expenditures Site Year End Printout COIIUIlitments Appropriation Budget Used at Dec. 31/79 Colonel Sam Smith 6,008.81 0 6,008.81 50,000 12 6,008.81 Humber Bay West 117,679.06 0 117,679.06 160,000 96 153,143.31 Humber Bay East 820,582.69 88,094.00 908,676.69 950,000 97 918,673.00 Western Beaches 0 0 0 5,000 . 103 5,135.65 Ashbridge's Bay 8,479.90 0 8,479.90 5,000 205 10,263.00 Bluffers Park 645,134.94 36,490.00 681,624.94 740,000 102 756,459.10 East Point Park 34,111. 03 0 34,111.03 20,000 171 34,111.03 Petticoat Creek 5,344.16 0 5,344.16 20,000 88 17,501.48 Studies/Salaries 47,395.32 0 47.395.32 50,000 95 47,395.32 StudiesjMonitoring 43.648.51 0 43,648.51 60,000 89 53,587.66 Shoreline Management 291,535.58 2,603.00 294,138.58 500,000 93 463,955.62 Land Acquisition 321,329.41 0 321,329.41 240,000 144 346,404.41 PROGRAM TOTALS 2,341.249.41 127,187.00 2,468,436.41 2,800,000 100.5 2,812.638.00 COMMENTS: The objectives for Waberfront Planning and Development in 1979 have generally been met. One of the main components which was not undertaken was the Environmental Assessment hearing preparation which had been budgeted for in 1979 but now will not occur until 1980. The over-expenditure at Ashbridge's Bay was due to higher than expected costs of placing and maintaining aids to navigation. The over-expenditure at East Point Park resulted from an approved addition to the work to be undertaken by the Authority's Master Plan consultant, and the over-expenditure in land acquisition resulted from the Land Compensation Board's decision on the Sunnypoint expropriation.. B-497 TO: The Chairman and Members of the Executive Committee, M.T.R.C.A. Meeting #21/79 - Wednesday, January 23, 1980 FROM: T. E. Barber, Administr~tor, Information and Education Division RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT - JANUARY 1 TO DECEMBER 31, 1979 (a) INFORMATION The Authority's information work is carried out under the Community and Staff Relations Program, which is comprised of four components, namely Administration, Conservation and Recreation Land Management Plan, Water and Related Land Management Plan, and The Metropolitan Toronto and Region Conservation Foundation. Highlights Included: - the production of 420,000 pieces of promotional literature describing the general activities of the Authority, the recreational, educational, and historical.facil~ties, and The Metropolitan Toronto and Region Conservation Foundation; - the distribution of approximately 315,000 copies of the Authority's promotional literature; - the completion of a variety of special printing projects, totalling 30,200; - the Authority's participation, with the Convention & Tourist Bureau of Metropolitan Toronto, in 300,000 copies of Superguide and 300,000 copies of the Attractions Brochure (both items promoting Black Creek Pioneer Village) , as well as participation in the bi-monthly publica- tion "Happenings", promoting the Authority's coming events. Also, staff attends regular meetings of the Attractions Council of the Convention & Tourist Bureau; - news and photo releases, reflecting the Authority's and Foundation's activities, have been written and distributed to media and School Boards (total distributed - 54,830) ; - samples of 1,660 press clippings, on all aspects of the Authority's activities, have been received; - a program of introducing the Kortright Centre for Conservation was carried out in 1979, with the financial assistance of a grant from National Museums Canada, including photo and news releases, filming, and interviews. Two special press previews were carried out at Kortright, on June 11th and 12th, to introduce the Centre to the members of the media; - two hundred and twenty-seven television promos (one-minute) , on the related activities of the Authority during the four seasons, have been distributed and are in use; - - the exhibit program in 1979 consisted of exhibits at the Scarborough Town Centre (for Canada Heritage Week) and at the Claireville Dam (for the Spring tour). Exhibit materials were supplied to Black Creek Pioneer Village staff for two displays. Also, the Authority's participation at the Canadian National Exhibition, in "Metroshow", went well. Staff designed and built the exhibit and based the program on the theme of the 25th Anniversary of Hurricane Hazel and the resource management activities of the Authority since; - the production and distribution of 2,200 copies of three issues of "Highlights" and 1,800 copies of three issues of "Inside" ; - twenty-six special photo assignments have been completed during this period; - staff organized two Town Hall Meetings, which were held at the Kortright Centre for Conservation on September 11th and 12th. Minutes were distributed to the staff; ? B..498 TO: Executive Committee, M.T.R.C.A. , #21/79 - January 23, 1980 RE: INFOR}~TION AND EDUCATION DIVISION - PROGRESS REPORT - JANUARY 1 TO DECEMBER 31, 1979 Page 2 - three new one-minute colour public service films are now in progress (one for the Kortrigbt Centre for Conservation - working copy); one for Flood Control and Water Conservation - completed except for final mix)~ and one for The Metropolitan Toronto and Region Conservation Foundation - preliminary stages); - a new program of postage meter identification stamps, relating to the Authority's activities, was undertaken ~n 1979~ - complete arrangements were looked after for Arbor Day on May 8th, the official opening of the Kortright Centre for Conservation on June 2lst, and for the Bill Davidson's Day Garden Party at Black Creek Pioneer Village on July 5th; - a waterfront tour was arranged and carried out on July 9th for new Federal Members of Parliament and a watershed tour, for new staff members, was carried out on November 13th~ - distribution of Authority brochures and Valley Regulations was completed, during the summer months, to all municipal offices and many government agencies in the watershed; - a committee has now been established to promote the Kleinburg and Town of Vaughan areas. A program will get underway in the new year; - the Hurricane Hazel 25th Anniversary Seminar was held on Wednesday, October 3rd in the Council Chambers, Toronto City Hall, and it resulted in substantial press coverage; - staff made Authority presentations to three service clubs in the area. (b) EDUCATION All the Conservation and Outdoor Education Programs are operating near capacity. In the period from January 1st to December 31st, 1979 4145 groups, representing some 103,618 individuals have participated. (i) Albion Hills Conservation Farm The farm at Albion Hills is now in full operation, with a program established for both the field centre in-residence students and outside students. These programs will be further developed during 1980, to provide a broader perspective to a wider range of students. . (ii) Kortright Centre for Conservation The Hon. Robert Welch officiated at the official opening ceremonies on Thursday, June 21st, 1979. Over 900 people were present for that occasion. The Forestry, Fish and wildlife and Water Committees have completed their reports. The Land and Energy Committees are expected to have their respective reports finalized early in the new year. Of ten exhibits scheduled to be designed and constructed by December 31st 1979, only one remains to be completed. There are seven additional exhibits in various stages of design and construction, and their completion is scheduled for June, 1980. The final phase of the Exhibit and Display Program is ready for presentation to Wintario in the near future. Information and directional signs are now in place on all major roads and highways leading to the Centre. The plan for the main entrance and patio area was completed, with the work for the entrance approximately 50% complete and the work for the patio 75% complete. Ten kilometres of nature trails were also completed. ...3... Executive Committee, #21/79 - January 23, 1980 B-499 TO: M.T.R.C.A. I RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT ~ January 1 to December 31, 1979 Page 3 Throughout the year there have been approximately 11,000 students involved in a variety'of education programs, all related to the Kortright Centr'e themes. A group from Quebec, on an exchange basis, visited the Centre to learn about resource management. Over 9,000 members of the general public have visited the Centre during the year. Included are: seminar groups, business meetings and certain special banquet groups. The Fish and Wildlife Agreement between the Ministry of Natural Resources and the Authority was updated in September, 1979 and it is intended that this agreement be the model for any future agreements drawn up between the Authority and a supporting Ministry of organi- zation for further theme support. (iii) Black Creek Pioneer Village - Education Programs The education programs at Black Creek Pioneer village continue to be popular, despite showing some of the effects of the present economic situation and the specific economic situation in the Authority and the School Boards. While there was a decrease in attendance from 1978, the total number of students participating in the village education programs is 60,000. This includes a host of specialized groups such as the disabled, the retarded, the deaf, the blind, the very new Canadians, etc. It is interesting to note that 1979 saw the one millionth participant in the Village education programs since their beginning, twenty years ago. (iv) Lake St. George Conservation Field Centre The opening of Lake St. George, Phase I, scheduled for the fall of 1979, will take place in January of 1980. The construction of Phase II is well under way, with the dormitory shell scheduled to be completed by the end of January. The student participation program for Phase I was very successful and a similar program for Phase II has been established, to commence in early February. Programs have been designed, in conjunction with the participating Boards of Education and are ready for implementation. A residential credit course in the summer of 1980 is proposed, and is currently under consideration. (v) Conservation Field Centres Albion, Boyd, and Claremont Residential Field Centres and Cold Creek Day Centre were all beyond 90% occupancy in 1979. In addition to regular programs, there were: _ a camping program for first-time campers at Cold Creek~ _ credit courses for teachers and others in July, in cooperation with York University and financially supported by a grant from the Canadian National Sportsmen's Show, at Albion Hills: - a specialized program, in cooperation with the United Synagogue Day School (orthodox) , at Claremont; - a program fo r the disabled, in cooperation with the March of Dimes, at Claremont; _ a special program for the Peel Regional Crossing Guards, in cooperation with the Peel Regional police, at Albion Hills; - a group of forestry students from the Faculty of Forestry, University of Toronto, at Claremont; _ a group of secondary level honour math and science students from the Board of Education for the City of North York, at Boyd: ...4... B-500 TO: Executive Committee, l-!.T.R.C.A. #21/79 - January 23, 1980 RE: INFORMATION AND EDUCATION DIVIS,ION - PROGRESS REPORT - January 1 to December 31, 1979 Page 4 - a program for the disabled, in cooperation with the Metro Toronto Schools for the retarded, at Boyd~ - a group ,of English-as-a-Second-Language students from the Metropolitan Separate School Board, at Boyd; - a senior credit course (Grade 11-12) in archaeology, in cooperation with the University of Toronto, the Board of Education for the City of North York and the Ontario Ministry of Education, at Boyd; - a program specially designed for the "Junior Farmers", at Boyd~ - several groups of girl guides, community groups and private groups were accommodated at the various field centres. (c) FINANCIAL COMMENTS A. Operations and Maintenance - Community Relations Expenditures and revenue are in line with budget estimates. At this time, and with the preliminary figures available to us, it would appear that there is a surplus of approximately $11,000. It is anticipated that the operating deficit at Lake St. George, in the amount of $18,500 can be offset from 1980 operating fees as agreed between the participating School Boards and the Authority. The deficit at Boyd, in the amount of $3,600 will be offset by a transfer from the Boyd Trust Fund, made up of previous years' operating surpluses from Boyd operations. B. Water and Related Land Management - Community Relations Program (W10) Kortright Centre - FurniShings, Exhibits & Equipment While only 57% of the budget, or $122,550 was spent on furnishings, exhibits and equipment at the Kortright Centre for Conservation in 1979, this expenditure was coincident with the cash flow available from the Foundation and represents just over ~ the approved Wintario project of $$233,319. Lake St. George - Development The development budget for Phases I and II, including additional expenditures for corrective works related to the requirements of the Ontario Fire Marshal, as approved by the participating School Boards, amounts to $404,500. The expenditure of $324,040 includes the contract commitments for the total contract. It is therefore estimated that the major development in this project will be completed within the budget estimate. Conservation Information Conservation Information is overspent by 2%, as a result of $14,069, spent on Hurricane Hazel Seminar and the C.N.E. exhibit, not being included in the original budget estimates for 1979. Conservation Education The overexpenditure of 3%, or $4,635, in Conservation Education represents (a) the difference between preliminary budget estimates and actual approved salaries~ (b) a minor adjustment for holiday credits to the Supervisor of the Kortright Centre, as recommended by the Personnel Sub-Committee and approved by the Executive Committee; and one month of his salary. ...5... B-50l A. OPERATIONS AND MhINTENANCE - COMMUNITY RELATIONS Information and Education Division Operations Expenditures Expenditures to Expenditures 1979 Budget December 31, 1979 % of Budget $874,113 $173,250 88% Revenue Revenue to Revenue 1979 Budget December 31, 1979 % of Budget $757,700 $667,806 88% B. WATER AND RELATED LAND MANAGEMENT - COMMUNITY RELATIONS - PROGRAH (WIO) 1979 Expenditures Expenditures Budget Dec. 31, 1979 % of Budget - Albion Hills 7,000 5,454 78% KCFC - Area Development 76,000 76,252 lOOt - Furnishings, Exhibits and Equipment 216,472 122,550 57% LSG - Development 260,722 324,040 124% (Phases I & II) 560,194 528,296 94% Cons. Information 85,500 87,700 102% Cons. Education 153,500 158,135 103% C. CONSERVATION AND RECREATION LAND MANAGEMENT -- CONSERVATION AREA INFORMATION AND INTERPRETIVE PROGRAM (C3) 1979 Expenditures to Expenditures Budget December 31, 1979 % of Budget $21,000 $22,706 108% TEB/mrp 1980.01.16 B-502 TO: Executive Committee, M.T.R.C.A., #21/79 - January 23, 1980 RE: INFORMATION AND EDUCATION DIVISION - PROGRESS REPORT - January 1 to December 31, 1979 Page 5 - C. Conservation and Recreation Land Management - Conservation, Area Information and Interpretive Program (C3) The overexpenditure of $1,706 was a result of substantially greater attendance than anticipated at Arbor Day, Bill Davidson's Day Garden Party and the Kortright Centre official opening. INFORMATION AND EDUCATION OPERATIONS JANUARY -- DECEMBER 1979 CONSERVATION EDUCATION PROJECT GROUPS PARTICIPANTS PARTICIPANT DAYS TEACHERS ACCOMP.CLASSES ,STUDENT TEACHERS TEACHER DAYS Conservation Field Centres: 21 705 Albion Hills 81 , 2,697 8,599 229 Claremont 89 2,942 9,938 240 27 723 Boyd 91 2,994 10, 130 204 10 726 Lake St. George Cold Creek - Day Programs 184 6,236 6,236 370 6 370 Cold Creek - Camping Program 15 369 33 Black Creek P~o~eer Village Educatlonal Tours 2,483 50,089 5,148 P~onetr Life Program 276 9,799 570 3 Kortright Centre for Conservation Publ~c 40 days 6,657 Edu~at~onal Programs 242 10,864 513 Other 42 2,675 Bruce's t'lill Educational Programs 139 6,377 310 Clairville Dam Educat~onal Programs 25 1,169 55 Public 2 days 215 \~atershed Tours 6 183 6 Albion Hills Educat~onal Programs 14 352 33 Total 103,618 34,903 7,711 67 2,524 I tJ1 I U1 0 l.o.I B-504 CONSERVATION LAND MANAGEMENT DIVISION PROGRESS REPORT JANUARY 1 - DECEMBER 31, 1979 The following progress report has been prepared on the basis of the various program activity in the Regional Municipalities. REGION OF PEEL Conservation Services In 1979, 55% (65,120) of the reforestation seedlings planted for private lando~ners were planted in this region. Under the Private Landowner Farm Tree and Shrub Program, 2169 trees and 5368 shrubs were planted. A total of 31,200 reforestation seedlings and 4,800 trees and shrubs were planted on Authority lands at Glen Haffy, Claireville, Heart Lake Conservation Areas and the East Palgrave Forest and Wildlife Area, (Gibson Lake). Plantation management reports were prepared for three Authority properties in Peel, as well as one biophysical inventory of the Claireville Conservation Area. Woodlot Management programs were carried out at Glen Haffy, Heart Lake and Claireville Conservation Areas and the East Pal grave Forest and Wildlife Area. One stream improvement project was carried out under the S.P.O.F. program and two projects under the Authority's stream improvement program on private lands. Conservation Area Development The Authority's major Conservation Area Development in Peel took place in the Albion Hills Conservation Area. In the campground a combined office and residence building was constructed to provide 24 hour supervision for the campground. This structure will be in operation for the opening of the 1980 camping season. As well, at Albion Hills, a new footbridge was constructed providing access to picnic areas on the north side of the Centreville Creek adjacent to the swimming area. The bridge will also be used during winter months by cross country skiers. At the Heart Lake Conservation Area an additional section of perimeter fencing was added to further secure the area and prevent unauthorized access. In the Glen Haffy Conservation Area, the fish rearing program was continued. - 2 - B-505 REGION OF PEEL (cont'd) Operations During the winter, Albion Hills, Claireville, Heart Lake and Palgrave Conservation Areas were open for winter activities. The Albion Hills ski program operated at capacity and the improved trails at Palgrave were well used. In preparation for the corning season program staff have been hired and replacement equipment obtained. A total of 57 groups have booked time in the Albion Hills ski program. On May 13, 1979 , an Open House was held at the Claireville Conservation Area to launch the Authority's new Canoe Instruction and Rental Program. The program operated from May 19 to September 18. As part of the Visitor Services program, a promotional brochure and flyer were circulated to schools, day camps, youth groups and sports stores. Thirty-two groups attended day instructional sessions. Three weekend courses and two evening courses held were well attended by the general public. The weekend rental demand for the l6 canoes and 8 rowboats was at or near capacity. The strong response to this program by the general public, school and organized groups resulted in a very successful summer program. Conservation Area facilities were in high demand by organized groups with a total of 280 picnic reservations and 6 day camps booked in the areas in the Region of Peel. Again this year the Experience Program played an important role in helping maintain Conservation Areas. Nineteen students were employed in this region's conservation areas. Conservation Area swimming facilities were extremely busy throughout the summer. Unfortunately, despite the excellent work performed by our lifeguard staff, there was a drowning fatality at the Claireville Conservation Area. Attendance at the Indian Line Campground was excellant with the campground at or near capacity particularly during August. During the fall, Conservation Area staff, in co-operation with the Property Division completed property line fencing at the Palgrave Forest and Wildlife Area. B-506 - 3 - RE~~OFro~ Conservation Services In York, 30,400 reforestation seedlings, 2,409 farm trees and 4,705 wildlife shrubs were planted for private landowners. On Authority lands, 15,900 seedlings, 1,700 farm trees and shrubs were planted at Boyd and Lake St. George. On Authority lands in York Region, two stream improvement projects were completed at Humber Trails and the Kortright Centre. On private lands, two projects were completed with approximately 200 meters of stream improved. Woodlot management projects were carried out at the Boyd and Bruce's Mills Conservation Areas as well as Lake St. George. A biophysical inventory was carried out at the Boyd Conservation Area. Conservation Area Development In York, at the Cold Creek Conservation Area, a Trap Range Control Building was constructed which will provide for ammunition storage, increased control of the use of the trap ranges, minor refreshment facilities, washrooms and warming area. In conjunction with this building, a 60 car parking lot was constructed. The building will be open in February with adjacent landscaping to be completed in 1980. The Rifle Range at Cold Creek was improved following consultation with the Ontario Provincial Police. These improvements will increase the visitor safety in the area. Materials were acquired for the construction of a new gatehouse to replace a temporary structure now in use. At the Bruce's Mill Conservation Area, a number of small improvements were made to the area including the installation of plexiglass windows in the pancake pavillion. Eighty square meters of interlocking pavement was acquired for installation around the maple syrup shack which will improve the area during spring use. The major development item at Bruce's Mill was the completion of the mill foundation. This work will reduce the unauthorized access to the building and will significantly enhance the structure. Operations During the winter, Boyd, Bruce's Mill and Cold Creek Con- servation Areas were open for winter activities. The Bruce's Mill Ski program operated below capacity but this situation is expected to improve as the area becomes better known. In this connection a well attended Open House was held on December 9, 1979 to publicize the area facilities. Significant improvements were made to the Cold Creek Ski Trails at the beginning of the year and further trail improvements were carried out in the fall. - 4 - B-507 REGION OF YORK ( con t ' d) Operations (cont'd) In preparation for the upcoming season, Bruce's Mill ski program staff have been hired, replacement equipment obtained and trail improvements carried out. Twenty-six groups have booked reservations in the ski program. The Maple Syrup demonstration at Bruce's Mill Conservation Area was well attended with school groups and general public visits up 900 and 2,300 respectively over the 1978 program. Conservation Area facilities were in high demand by organized groups with a total of 267 picnic reservations and lO day camps booked in the York Region Conservation Areas. This year's Experience Program again played an important role in maintaining Conservation Areas with 10 students employed in the Region's Conservation Areas. Area swimming facilities were very busy during the summer. An upstream sewage treatment plant spill on the east branch of the Humber River resulted in closing the Boyd swimming area for approximately 2 weeks in early August. This seriously affected the Boyd Area attendance. During the fall, property line fencing was completed at the Nashville Reservoir in co-operation with the Property Division. Construction of a model airplane landing strip was completed at the Cold Creek Conservation Area in preparation for the use of this site by a club commencing in the spring of 1980. B-508 - 5 - REGION OF DURHAM In Durham, 27,700 reforestation seedlings, 135 farm trees and llO wildlife shrubs were planted on private lands. 2,900 seedlings and 120 trees were planted at the Glen Major Forest and Wildlife Area as part of a gravel pit rehabilitation project. Woodlot management and a biophysical inventory were carried out at the Greenwood Con- servation Area this year. A tree maintenance program was carried out at the Petticoat Creek Conservation Area. As part of the S.P.O.F. program, approximately 1,800 meters of stream were improved through projects of bank stabilization, fencing and buffer plantings. Eight projects were completed in Durham on the Duffin Creek. Conservation Area Development In Durham, the major activity took place in the Greenwood Conservation Area where three footbridges were ~nstalled by area staff . These bridges provide access to a day camp area, the nature trail and will connect existing snowmobile trails. Operations Greenwood, and for the first time, Claremont Conservation Area, were open for Winter activities. At Claremont, the improved ski trails were well used. This fall, further improvements were completed on the ski trails at Claremont and the snowmobile trails at Greenwood. During_the summer, Conservation Area facilities were in great demand by organized groups with 186 picnic reservations and B day camps booked in the Region's Conservation Areas. This year's Experience Program had B students employed in the maintenance of Conservation Areas. The Petticoat Creek Area pool winterizing procedures were again successful and the pool opened on time. However, it was necessary to close the pool on a number of occasions during the summer due to mechanical breakdown in the plumbing and filtering equipment. Repairs were carried out this fall in co-operation with the Water Resource Division, Water Front Section. Conservation Area staff completed property line fencing at the Glen Major Forest and Wildlife Area in co-operation with the Property Division. - 6 - B-509 MONO/ADJALA Twenty-three thousand reforestation seedlings and 205 farm trees were planted for private landowners. One stream improvement project was carried out under the S.P.O.F. program on private lands. GENERAL Conservation Services Stream assessment was carried out on the headwaters of the Humber River to study the cold water streams for fish habitat im- provement. One reforestation subsidy was approved for a landowner in Durham Region for the planting of l5,000 reforestation seedlings. Approximately 80 site visits were carried out throughout the watershed for technical advice on land management concerns. Eight farmland rentals of Authority owned lands were reviewed for: the purpose of updating and reviewing the leased. Landscape projects in 1979 included the Kortright Centre for Conservatio~ rehabilitation of the Petticoat Creek Collector Sewer Line and the first phase of the landscape development project at the South Thackeray Sanitary Landfill Site. A tree maintenance project was also carried out at Humber Bay East Waterfront Project. Re-vegetation and bank stabilization were carried out on one site in York Region in conjunction with the Flood Control Section under the Peel, York, Durham, Erosion Control Project. Approximately 740 trees and 6,000 shrubs were supplied to the Flood Control Section for their revegetation program in Metro- politan Toronto. The Authority nursery program expanded this year and will continue to do so. Thirty-three thousand shrubs and 10,000 trees and 700 calibre trees were supplied to private, public and Authority programs. A total of 200 trees were moved for private landowners within the watershed under the Private Tree Spade Rental Program. One conservation plan was completed this year. B-5l0 - 7 - GENERAL (cont'd) Conservation Area Development A handout Visitor Survey was carried out in the Conservation Areas using 3 Experience '79 Students. Results from the summer survey are complete and include information on visitor origin, group size, activity preferences and cross visitation between conservation areas. The comments received from the visitors are of value in the ongoing operations and planning of the Conservation Areas and will be available in February. In April of 1979, the Interim Conservation and Recreation Land Management Plan was presented to the Conservation Land Management Advisory Board. Following receipt of the draft plan by the Authority it was circulated to the Province of Ontario and to the Authority's member municipalities. Staff are currently reviewing this component for inclusion in the Watershed Plan. Operations The 1979 winter ski season was shorter than previous years due to lack of snow in early January and late December. This combined with cool early spring weather resulted in a decrease in attendance despite an increased attendance during the summer period. Of interest is the fact that 36 of the Special Passes distributed at the 1979 C.N.E. were redeemed at Conservation Areas. The attached table compares 1979 and 1978 individual Con- servation Area attendance figures. In 1979 attendance decreased 87,868 or 8%. - 8 - B-511 Attendance at Conservation Areas C.N.E. 1979 1978 PASSES - - PEEL Albion Hills 0 158,734 194,955 C1aireville 0 101,888 94,010 Glen Haffy 11 63,170 54,25l Heart Lake 7 112,117 133,288 Palgrave 0 6,018 Indian Line 0 49,952 43,512 492,479 520,016 YORK Boyd 3 158,964 193,655 Bruce's Mill 7 185,780 198,836 Cold Creek 1 37,456 46,943 Humber Trails 0 4,263 3,740 WOOdbridge 0 12,233 15 , 9 36 398,696 459,110 DURHAM Claremont 2 29,090 31,733 Greenwood 1 57,231 61,019 Petticoat Creek 4 98,832 92,318 185,153 185,070 TOTAL ATTENDANCE: 36 1,076,328 1,164,196 B-5l2 - 9 - FINANCIAL COMMENTS The financial comments and figures below relate to the information supplied through the Finance Division on the pre- liminary assessment of the year end financial statements. FINANCIAL STATEMENT - JANUARY - DECEMBER 1979 YR. TO mTE '!UrAL , BUD.:E1' EXPEND. CDMMIT . APproX. ~ USED Cbns. Areas D;!veloFlfEl1t 268,602 4,425 273,027 270,000 101 . Cbns. Areas Operations 1,394,291 5,561 1,399,852 1,370,800 102 Rmt & Utility Services '39.143 - .39,143 39,000 100 Private Land Program 119,028 565 119,593 113,000 106 Authori ty Land Program 89,610 - 89,610 95,000 94 Cbns. Areas ~venue 750 ,619 - 750,619 710,000 106 Private Land ~venue 14,978 - 14,978 15,000 100 Financial Comments The Private Land Assistance programs were very active in 1979 and completion of projects resulted in an over-expenditure. Revenues from Private Land programs were on target. The overspending in the Private Land programs was offset by a reduction in spending on Authority Land Programs. Conservation Areas Development overspending was a result of the Albion Hills and Cold Creek buildings actual construction costs exceeding budget estimates. This overexpenditure will be picked up by Conservation Areas operations ,unless additional funding is available from the Province. Conservation Area Operations spending exceeded budget estimates. This was a result of obtaining several items at year end which were not included in the original estimates. This overspending was possible because of excess revenue obtained which more than offset excess spending. h SCHEDULE "B" B-513 TO: The Chairman and Members, Executive Committee, M.T.R.C.A. , #21/79. FROM: K.G. Higgs, Secretary-Treasurer. RE: REPORT #7/79 -PERSONNEL SUB-COMMITTEE THE COMMITTEE RECOMMENDS THAT: 1. The Property & Administration Division and the Finance Division be amalgamated; and THAT the "Function of the Finance and Administration Division", as attached as Appendix 1 hereto, be approved, effective January 23, 1980. . 2. The position description "Director of Finance and Administration", as attached as Appendix 2 hereto, be approved. 3. The following appointment be made to the Full Time Staff: Name Posi tion Leve 1 Effective Date W.E. Jones Director of Finance and 11 January 23, 1980 Administration 4. In view of the decision to amalgamate the Property & Administration Division and the Finance Division, the following appointment to the Full Time Probationary Staff be terminated: Name Position Level Effective Date G. Dudar Administrator of Finance lO January 23, 1980 Attach. 1980.01.21. B-514 Function of: The Finance and Administration Division IPa~e: K-l The responsibilities of the Division encompass financial management of the Authority and monitoring of financial procedures to support the goals of the Authority. The Division is responsible for acquisition and management of property, management of Authority legal services, management of the Authority's Administration offices and grounds, and provision of administrative services to all Divisions of the ~uthority. Individual responsibili ties are as follows:- . - compilation of the annual Authority budget in co- operation with the Secretary-Treasurer, the Director of Planning & Policy and all Divisions of the Authority - compilation of the multi-year forecast in co- operation with the Secretary-Treasurer, the Director of Planning & POlicy and all Divisions of the Authority - accounts payable - accounts receivable - payroll - auditing - inventory control - systems analysis - personnel administration - miscellaneous services related to accounts and record keeping - acquiring of property ,and property rights - leqal services - maintenance of Authority's Administrative Offices and grounds - all insurance - central mailing - duplication - stationery, office supplies, furniture and equipment - reproduction of agendas, minutes and reports for all Authori ty, Executive and Advisory Board meetings B-515 Division: Finance and Administration rAGE: L-3 POSITION: Director EXECUTIVE r DATE: CI.i\SS. LEVEL: 11 RESOLUTI ON . TERMS OF REFERENCE The Director of Finance and Administration is responsible to the Secretary-Treasurer for the financial management of the Authority, the administration of the Authority's personnel policy, is Deputy-Treasurer and a signing officer of the Authority, is responsible for the acquisition and management of property, mana~ement of the Authority's legal services, management of the Authority's Administrative Offices and grounds, and provision of administrative services to all Divisions. Individual responsibilities are as follows:- - establishmen~ co-o~dination and monitoring of the Authority's system of financial management - supervision of all accounting, banking, auditing and financial reporting and information procedures - supervision of payroll and personnel administration functions - compilation of the Authority's annual budget estimates and multi-year forecasts in co-operation with the Secretary-Treasurer, Director of Planning and Policy and all Divisions of the Authority - liaison with the Authority's bankers, auditors and representatives of the Provincial and Federal Governments and Member Municipalities, regarding financial matters - receiving property plans and instructions from Authority Divisions charged with the responsibility of designating lands or property rights for acquisition - initiating, developing, recommending and implementinR policy and plans to meet the property needs oC The Me tropoli ta n Toron to and Region Conservat ion Authorf ty - developing and implementing plans and programs for property management, ine! ud inR the Administrative Head Office - maintaining all records concerning property, including land survey plans. assess- ments, taxation, insurance, leases, rentals, deeds, agreements, Ontario Municipal Board applications and including all legal documents - instructing the Authority's solicitors in all matters requiring legal assistance - assisting all Divisions with legal matters, including preparation of agreements and other documents as required - supervision of the Authority's duplicating and mailing operations - co-ordination of the Authority's insurance requirements, including maintenance of insurance records and processing of claims - provision of all stationery, office supplies, furniture and equipment - operation of the Authority switchboard - supervision of the use of the Authority's printing and mailing equipment - duplication and distribution of all Authority, Executive and Advisory Board agendas, minutes and reports QUALIFICATIONS AND EXPERIENCE - a sound background of financial, accounting, auditing and management practices - a thorough knowledge of general administration procedures - an ability to prepare concise and accurate reports - an ability to work effectively with other persons in rclnted and unrelnted disc I pI illL's.