HomeMy WebLinkAboutWaterfront Advisory Board 1978the metropolitan toronto and region conservation authority minutes WATERFRONT ADVISORY BOARD TUESDAY -MAY -9 -1978 H -1 #1/78 The 'iaterfront Advisory Board met at the Authority office, 5 Shoreham Drive, Downsview, on Tuesday, May 9, 1978, commencing at 1:30 p.m. PRESENT WERE Chairman Vice Chairman Members Vice Chairman of the Authority Dir.- Planning and Policy Adm. -Water Resource Division Head -W /F Section, W.R. Div'n. Project Planner, W.R. Div'n. Project Biologist, W.R. Div'n. Environmental Applications Group ABSENT WERE Members M.J. Breen C.A. Mackie Mrs. J.A. Gardner Mrs. S. Martin G. Norton Mrs. N. Pownall G.B. Sinclair Mrs. J. Trimmer Mrs. F. Gell W.A. McLean M.R. Garrett B.E. Denney T.E. Farrell I.D. Macnab P. Hildebrand H. Miamoto J. Sparling T.W. Butt D. Kitchen M.D. Lipton A.E. O'Donohue P.B. Pickett, Q.C. J.G.C. Weir MINUTES The Minutes of Meeting #4/77 were presented. Res. #1 Moved by: Seconded by: Mrs. S. Martin G. Norton RESOLVED THAT: The Minutes of Meeting #4/77, as presented, be adopted. CARRIED; STAFF PROGRESS REPORT The staff presented a verbal Progress Report on the activities of the Waterfront Section of the Water Resource Division. Res. #2 Moved by: Seconded by: G.B. Sinclair Mrs. J.A. Gardner RESOLVED THAT: The Staff Progress Report be received. CARRIED; REPORT ON THE 1977 WATERFRONT ENVIRONMENTAL MONITORING PROGRAMME The staff submitted a report on the 1977 Waterfront Environmental Monitoring Programme. H -2 -2- It was requested by the Chairman that the staff prepare a report for presentation to the next meeting of the Board, providing comparison of water quality at outfalls into the Detroit, Ottawa and St. Lawrence Rivers. Res. #3 Moved by: G.B. Sinclair Seconded by: C.A. Mackie RESOLVED THAT: The staff Report on the 1977 Waterfront Environmental Monitoring Programme be received. CARRIED; ti: CAOPOI.ITAN 'TORONTO & REGION ATERFRON;, I'POJECT: 1977 -1981 WESTERN BEACHES MASTER PLAN - Amendment The staff presented a report regarding the Western Beaches Master Plan - Amendment. Res. #4 Moved by: G.B. Sinclair Seconded by: G. Norton RESOLVED THAT: The staff report regarding the Western Beaches Master Plan - Amendment, be received; and THE BOARD RECOMMENDS THAT: The amendment dated April 1978 to the Western Beaches Master Plan, consisting of the retention of the beach between the Boulevard Club and the Toronto Sailing and Canoe Club and the requirement for title of the Palais Royale, subject to the City of Toronto agreeing to a lease -back, be approved; and THAT the City of Toronto, The Municipality of Metropolitan Toronto and the Province of Ontario be requested to approve of the amendment; and further THAT the City of Toronto be advised that, in accordance with the policy of The Metropolitan Toronto and Region Conservation Authority, the Authority will require title to and control of all City lands desig- nated in the revised Master Plan for the Western Beaches, dated June 1975, including the Palais Royale, and that until this condition is fulfilled, no development activity by the Authority can proceed. CARRIED; THE METROPOLITAN TORONTO & REGION WATERFRONT PROJECT: 1977 -1981 HUMBER BAY WEST MASTER PLAN -Modification to Accommodate The Toronto Brigantine, Inc. The staff presented a report on the accommodation of the Toronto Brigantine, Inc. Res. #5 Moved by: Mrs. F. Gell Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff report regarding the accommodation of the Toronto Brigantine, Inc. be received; and THE BOARD RECOMMENDS THAT: The Master Plan for the Humber Bay West Area be slightly modified to provide a small bay to accommodate the Toronto Brigantine, Inc. operations. CARRIED; THE METROPOLITAN TORONTO & REGION WATERFRONT PROJECT: 1977 -1981 COLONEL SAMUEL BOIS SMITH WATERFRONT AREA, ETOBICOKE SECTOR - Proposed Master Plan The staff presented a report on the Proposed Master Plan, Colonel Samuel Bois Smith Waterfront Area, Etobicoke Sector. -3- H -3 Representatives of the Environmental Applications Group, who are consultants to the Authority for environmental considerations in connection with the Colonel Samuel Bois Smith Waterfront Area, gave information pertaining to the environmental aspects of the Plan. Res. #6 Moved by: Mrs. S. Martin Seconded by: Mrs. N. Pownall RESOLVED THAT: The Colonel Samuel Bois Smith Waterfront Area Master Plan, dated April 1978, be amended to include the provision that the scamonai ;'rioaz my of watercraft classified as 'runabouts', excepting those required in the proposed 'Learn to Sail' programme, be prohibited, and that the use of noisy watercraft be discouraged. Res. #7 Moved by: Mrs. S. Martin Seconded by: G.B. Sinclair CARRIED; RESOLVED THAT: The Colonel Samuel Bois Smith Waterfront Area Master Plan, dated April 1978, be further amended to include the provision that the use of model power boats be prohibited at this site. Res. #8 Moved by: G.B. Sinclair Seconded by: Mrs. J.A. Gardner CARRIED; RESOLVED THAT: The proposed Master Plan for the Colonel Samuel Bois Smith Waterfront Area, Etobicoke Sector, be received, as amended; and THE BOARD RECOMMENDS THAT: The Colonel Bois Smith Waterfront Area Master Plan, dated April 1978, as amended, be adopted; and THAT the following action be taken: The Colonel Samuel Bois Smith Waterfront Area Master Plan, dated April 1978, as amended, be forwarded to the Borough of Etobicoke, The Municipality of Metropolitan Toronto, the Province of Ontario and Humber College of Applied Arts & Technology, for consideration and approval. AQUATIC PARK- Interim Uses The staff presented a report on interim uses at Aquatic Park. CARRIED; Res. #9 Moved by: G.B. Sinclair Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff report concerning interim uses at Aquatic Park be received; and THE BOARD RECOMMENDS THAT: The programme of interim uses at Aquatic Park for 1978, established by the Toronto Harbour Commissioners, be endorsed. CARRIED; GREAT LAKES PUBLIC AWARENESS PROGRAMME The staff presented a communication, together with two brochures - 'Coping with the Great Lakes' and 'Not Ours to Control' - received from the Ministry of Natural Resources. Res. #10 Moved by::; G.B. Sinclair Seconded'b': Mrs. J.A. Gardner RESOLVED THAT: The communication, dated April 5, 1978, from the Ministry of Natural Resources, together with the brochures 'Coping with the Great Lakes' and 'Not Ours to Control', in connection with the Great Lakes Public Awareness Programme, be received. CARRIED; H -4 -4- NEW BUSINESS The correspondence received from the Lakefront Owners Association was referred to the staff for input to the Master Plan of the Colonel Samuel Bois Smith Waterfront Area. ADJOURNMENT On Motion, the meeting adjourned at 5:00 p.m., May 9. M.J. Breen W.A. McLean, Dir. of Planning & Polic' Chairman Acting Secretary- Treasurer the metropolitan toronto and region conservation authority minutes WATERFRONT ADVISORY BOARD THURSDAY - SEPT -7 -1978 H -5 #2/78 The Waterfront Advisory Board met at the Authority office, 5 Shoreham Drive, Downsview, on Thursday, September 7, 1978, commencing at 1:30 p.m. PRESENT WERE Chairman Members Chairman of the Authority Vice Chairman of the Authority Secretary- Treasurer Adm. - Water Resource Division Head - Waterfront Section, WRD Project Planner, Water Resource Divn. Project Biologist, Water Resource Divn. Engineer - Waterfront Section, WRD Toronto Brigantine Incorporated ABSENT WERE Vice Chairman Members MINUTES The Minutes of Meeting #1/78 were presented. Res. #11 Moved by: Seconded by: RESOLVED THAT: The Minutes of M.J. Breen Mrs. J.A. Gardner D. Kitchen Mrs. S. Martin G. Norton Mrs. N. Pownall G.B. Sinclair R. Grant Henderson Mrs. F. Gell K.G. Higgs M.R. Garrett B.E. Denney T.E. Farrell I.D. Macnab J. Gillis Maurice F. Anderson Charles F. Petersen Jack Jones Dan Dunlop Graham Taylor C.A. Mackie T.W. Butt M.D. Lipton A.E. O'Donohue P.B. Pickett, Q.C. Mrs. J. Trimmer J.G.C. Weir G. Norton Mrs. J.A. Gardner Meeting #1/78, as presented, be adopted. CARRIED; DELEGATION - TORONTO BRIGANTINE, INCORPORATED Toronto Brigantine Incorporated presented plans and a model for the proposed restoration of the "Bluebell" hull as its base of operations, to be located at Brigantine Cove, Humber Bay West. Res. #12 Moved by: Mrs. J.A. Gardner Seconded by: G. Norton THE BOARD RECOMMENDS THAT: The restoration of the "Bluebell" hull, as proposed by Toronto Brigantine Incorporated, to be used as its base of operations and located at Brigantine Cove, Humber Bay West, be approved, as presented, subject to the approval of The Municipality of Metropolitan Toronto. CARRIED; H -6 -2- STAFF PROGRESS REPORT The staff presented a detailed Progress Report on Humber Bay East, Humber Bay West, Ashbridges Bay and Bluffers Park Waterfront Area. Res. #13 Moved by: G.B. Sinclair Seconded by: D. Kitchen RESOLVED THAT: The Staff Progress Report be received. Res. #14 CARRIED; Moved by: Mrs. J.A. Gardner Seconded by: G. Norton RESOLVED THAT: The staff be requested to develop an Information Programme on the work that the Authority has carried out on the Metropolitan Toronto Waterfront; and THAT an audio - visual presentation be developed for presentation to the general public, service clubs, other groups, and to Councils and committees of Councils of the member municipalities. SUPPLEMENTARY PROJECT TO THE METROPOLITAN TORONTO AND REGION WATERFRONT PROJECT: 1977 -1981 CARRIED; The staff presented a communication identifying the works considered to be essential and the additional funding required to undertake those works within the current Waterfront Project 1977 -1981. Res. #15 Moved by: G.B. Sinclair Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The staff communication, together with the Supplementary Project to The Metropolitan Toronto and Region Water- front Project 1977 -1981, be received; and THE BOARD RECOMMENDS THAT: The Supplementary Project to The Metropolitan Toronto and Region Waterfront Project 1977 -1981, as appended as Schedule "A" of these Minutes, be adopted; and THAT the following action be taken: (i) The Municipality of Metropolitan Toronto and the Province of Ontario be requested to approve the Supplementary Project to The Metropolitan Toronto and Region Waterfront Project 1977 -1981; (ii) The Municipality of Metropolitan Toronto be designated as benefiting municipality for the Supplementary Project in the amount of $496,000.00 for each of the years 1979, 1980 and 1981; (iii) The Province of Ontario be requested to approve a grant of 50% of the costs associated with the Supplementary Project for each of the years 1979, 1980 and 1981; (iv) The Municipality of Metropolitan Toronto be requested to join with the Authority in its endeavour to obtain the 50% grant for the Supplementary Project from the Province of Ontario. PRELIMINARY BUDGET ESTIMATES - 1979 The 1979 Preliminary Budget Estimates were presented. Res. #16 Moved by: G.B. Sinclair Seconded by: G. Norton CARRIED; RESOLVED THAT: The 1979 Preliminary Budget Estimates for the Water Resource Division, Waterfront Section, dated 1978.08.28, be approved in principle; and -3- H -7 THE BOARD RECOMMENDS THAT: The 1979 Preliminary Budget Estimates for the Waterfront Section, Water Resource Division, as appended as Schedule "B" of these Minutes, be included in the 1979 Preliminary Budget Estimates of the Authority. CARRIED; SCARBOROUGH SECTOR WATERFRONT AREA - Shoreline Protection The staff presented a report and proposals on shoreline protection, Scarborough Sector Waterfront Area. Res. #17 Moved by: Mrs. S. Martin Seconded by: D. Kitchen RESOLVED THAT: The report and proposals on Shoreline Protection - Scarborough Sector Waterfront Area, be received; and THE BOARD RECOMMENDS THAT: The staff report and proposals on Shoreline Protection - Scarborough Sector Waterfront Area, as appended as Schedule "C" of these Minutes, be approved; and THAT the staff be directed to proceed with the preparation of a detailed Master Plan, including environmental assessment, for the protection of the Scarborough shoreline by means of a system of artificial beaches; and further THAT a short test section be installed in 1979, funds permitting, at a location to be selected as soon as possible; and further THAT in the interim, acquisition and protection of critical areas continue in accordance with existing Authority policy. CARRIED; EASTERN BEACHES WATERFRONT AREA - Shoreline Protection The staff presented a report on proposals for shoreline protection at the Eastern Beaches. Res. #18 Moved by: G.B. Sinclair Seconded by: Mrs. J.A. Gardner RESOLVED THAT: The report on proposals for shoreline protection at the Eastern Beaches Waterfront Area be received for information. CARRIED; AJAX WATERFRONT - Conceptual Plan The staff presented a report, advising that the following resolution has been received from the Council of the Town of Ajax: "That The Metropolitan Toronto and Region Conservation Authority be requested to update their conceptual plan for the Ajax Waterfront." Res. #19 Moved by: G. Norton Seconded by: Mrs. S. Martin RESOLVED THAT: The request by the Town of Ajax that the Authority update its conceptual plan for the Ajax Waterfront be received; and THAT the Town of Ajax be advised that the Authority will assist with any necessary planning review of the conceptual plan of the Ajax Waterfront; and further THAT the Town be further advised of the limited financial capability of the Authority for carrying out development along the Ajax Water- front up to 1981. CARRIED; h-8 -4- RELOCATION OF OUTER HARBOUR SAILING FEDERATION TO AQUATIC PARK The staff presented a communication and brief having regard to the proposed relocation of the Outer Harbour Sailing Federation to Aquatic Park. Res. #20 Moved by: Mrs. J.A. Gardner Seconded by: Mrs. N. Pownall RESOLVED THAT: The proposal to The Toronto Harbour Commissioners - Relocation of the Outer Harbour Sailing Federation to the Aquatic Park, presented by The Commodores, Outer Harbour Sailing Federation, April, 1978, together with the staff report, be received; and THE BOARD RECOMMENDS THAT: A wholesale relocation of the Outer Harbour Sailing Federation to Aquatic Park not be permitted by the Toronto Harbour Commissioners at this time; but THAT consideration be given to relocating the Outer Harbour Sailing Federation at Aquatic Park as part of the preparation of the Implementation Plan. CARRIED; WESTERN BEACHES WATERFRONT AREA - Revised Master Plan The staff presented a communication having regard to an amendment to the Western Beaches Waterfront Area Master Plan, allowing for the retention of the beach between the Boulevard Club and the Toronto Sailing and Canoe Club. City Council considered this matter at its meeting of July 17, 1978. Res. #21 Moved by: Seconded by: G. Norton G.B. Sinclair RESOLVED THAT: The staff report on the Western Beaches Waterfront Area Revised Master Plan be received; and THE BOARD RECOMMENDS THAT: Having regard to the recommendations of the Council of the City of Toronto (July 17, 1978), as set forth herein: "It is recommended that the amendment dated April, 1978 to the Western Beaches Master Plan of the M.T.R.C.A., with respect to the retention of the beach between the Boulevard Club and the Toronto Sailing and Canoe Club, be amended by adding to the list of the proposed improve- ments the establishment of appropriate swimming beach amenities; and that the amendment, as so amended be approved." "It is further recommended that the staff of the M.T.R.C.A. be invited to participate in the negotiations, authorized by Council on March 28, 1978, between the Commissioner of Parks and Recreation and the Sailing Club with respect to the relocation of the boat storage area now on the beach area." "It is also recommended that the transfer of lands of M.T.R.C.A. be subject to a tri -party agreement to be executed placing the Palais Royale site under the juris- diction of the City of Toronto." -The City of Toronto be requested to clarify what is meant by "appropriate swimming beach amenities "; and THAT the City of Toronto be advised that Authority plans for the beach area between the Toronto Sailing and Canoe Club and the -5- H -9 Boulevard Club call for grading and beach improvements, additional plantings and berming, particularly along the western side, and the extension of a pathway down to the beach; and further THAT no additional works can be justified for this area as part of an Authority undertaking; and further THAT The Municipality of Metropolitan Toronto be requested to inform the Authority and the City of Toronto as to whether it intends to retain the leases for the Toronto Sailing and Canoe Club and the Boulevard Club or to transfer them to the City of Toronto via a tri- party agreement; and further THAT the City of Toronto be advised that the staff of the Authority will participate in discussions held by the City regarding the future of the Boulevard Club and the Toronto Sailing and Canoe Club. CARRIED; ADJOURNMENT On Motion, the meeting adjourned at 3:50 p.m., September 7. M.J. Breen Chairman K.G. Higgs Secretary- Treasurer H -10 SUPPLEMENTARY PROJECT TO THE METROPOLITAN TORONTO AND REGION WATERFRONT PROJECT - 1977 -1981 SCHEDULE "A" H -11 SUPPLEMENTARY PROJECT TO THE METROPOLITAN TORONTO AND REGION WATERFRONT PROJECT 1977 - 1981 1. SUBJECT: Preparation of Supplementary Project to The Metropolitan Toronto and Region Waterfront Project 1977 -1981, by The Metropolitan Toronto and Region Conservation Authority. 2. DETAILED DESCRIPTION: (i) Purpose: Due to the acquisition of the Guild Inn property, which was not anticipated within the current Waterfront Project, 1977 -1981, supplementary funding is required to carry on essential works for the remaining three years (1979 -1981) of the Waterfront Project. It is the intent of this Supplementary Project to identify the works and funding requirements considered to be essential. (ii) Basic Data Pertaining to the Matter: In November, 1970, the Authority was designated by The Province of Ontario to serve as the implementing agency for the 1967 Waterfront Plan which had been prepared for the Metropolitan Toronto Planning Area and adopted in principle by all affected municipalities. Since that time the Authority has prepared a 10 -year Waterfront Plan which established long term goals and development objectives; and two 5 -year Waterfront Projects which established development policy and procedures, designated development sites, and provided for the financing of the work to be undertaken. The property known as the Guild Inn, situated on the Scarborough waterfront, has been included in waterfront planning since the preparation of the 1967 Waterfront Plan. Lengthy negotiations to bring this property into public ownership have occurred since 1971. In 1978, an appropriate price was negotiated and approval to acquire the Guild Inn property was received from the Authority, Metropolitan Toronto and The Province of Ontario. The Waterfront Project, 1977 -1981, however, did not include specific reference or monies for the Guild Inn lands as they previously had been the subject of lengthy negotiations and was felt that they would not become available during the period 1977 -1981. As a result, in order to provide the funding required for the acquisition, monies within the existing funding for the Waterfront Project, 1977 -1981, had to be reallocated. With the reallocation of funds for the acquisition of the Guild Inn property in 1978, funding for the remaining three years of the current Waterfront Project would approximately be as follows: 1979 $2,608,000. 1980 $2,608,000. 1981 $2,608,000. With this level of funding, it would be possible for the Authority to continue and complete the Humber Bay East Waterfront Area; Humber Bay West Waterfront Area, Phase II; Bluffers Waterfront Area, Phase II; and a minor acquisition programme. H -12 2 The Authority would not be able to carry out any development at the following waterfront areas approved as part of the Waterfront Project, 1977 -1981: - Marie Curtis - Colonel Samuel Bois Smith - Western Beaches - Bluffers Park West - East Point - Lower Rouge - Frenchman's Bay - Duffin's Creek - Bluffers Topland - Ajax Waterfront - Shoreline Management While delays in some of these works is not regarded as critical, others are considered to be essential works of sufficient importance and urgency that additional funding is required within the Waterfront Project 1977 -1981. These essential works are: - landfilling at the Colonel Samuel Bois Smith Waterfront Area - improvements along the Western Beaches Waterfront Area - the continuation of the shoreline management programme (iii) Description of Essential Works: (a) Colonel Samuel Bois Smith Waterfront Area: The Authority has recently prepared a Master Plan for the Colonel Samuel Bois Smith Waterfront Area. The Master Plan is presently going through the required approval process with all approvals anticipated being received by the end of 1978. The Etobicoke Waterfront is primarily urbanized and privately owned. Potential regional access for water- front park purposes is limited to three locations, one of which is the Colonel Samuel Bois Smith site. As a result, there is a need for additional regional waterfront parkland along the Etobicoke waterfront and due to the extent of urbanization, a land creation system has been deemed to be the most appropriate for the Colonel Samuel Bois Smith Waterfront Area. As the Colonel Samuel Bois Smith Waterfront Area will be the next major development site along the Etobicoke waterfront, and as it will involve land creation, the logical progression would be to transfer landfill operation to the Colonel Samuel Bois Smith site upon completion of Humber Bay West, Phase II. In a transfer of landfill operations, timing is very significant. If the Humber Bay West, Phase II site is completed and the Colonel Samuel Bois Smith site is not available, then truckers -and excavators would be forced to seek alternative dumping areas. If such was to be the case, the immediate impact would be increased excavatioT costs in the Metropolitan Toronto area. As well, if alternative non - waterfront dumping areas were to be utilized, then it may be extremely difficult and may require an extensive period of time before a landfill operation for the Colonel Samuel Bois Smith site could be built up, comparable to those presently found at Humber Bay West, Phase II and Bluffers, Phase II. As well, over the last several years, Humber College has completed expansion plans for its Lakeshore Campus. The co- ordination of park development at the Colonel Samuel Bois Smith site with the adjacent expansion of the Lakeshore Campus of Humber College, would afford both parties the opportunity to enter into cost sharing for some facilities and services and for joint use. Such an arrangement would reduce land requirements and costs. - 3 H -13 (b) Western Beaches: The Western Beaches Master Plan proposes the establishment of three major activity nodes linked up by connecting pathways and sub - nodes. At present, a number of priorities have arisen in the Western Beaches which require serious consideration. These priorities include improvements to the major node at the Sunnyside area; shoreline works and beach improvements; and, water quality improvements in the area between the existing shoreline and the breakwater. The Sunnyside node is the most intensely used portion of the Western Beaches. This use over the years, however, has taken its toll as the bathing pavillion is in a serious state of disrepair. The increasing inability of the pavillion to meet Health and Building Standards may conceivably see this facility closed down in the next season or so unless renovations are undertaken. Storm activity and wave action over time, have resulted in the washing away of sand beaches and the erosion of parkland. Beach improvements, namely beach feeding and shoreline protective works are required to stabilize the shoreline of this already narrow waterfront area. In conjunction with the stabilization and general enhancement of the shoreline, water quality improvements behind the breakwater are also of importance. As the Humber River discharges at the west end of the Western Beaches Waterfront Area, silt and other suspended material is trapped behind the breakwater. Such material has built up to the point where it is now impossible for boats to use the western portion behind the breakwater. The trapped material not only creates a sedimentation problem but a water quality problem as well. The dredging of some of this material in conjunction with the construction of a hydraulic structure to deflect the flow of the Humber River away from the breakwater would improve water quality and boating safety behind the breakwater. (c) Shoreline Management: The Authority's.shoreline manage- ment programme consists of three major components; the regulation of hazard areas, acquisition of endangered properties and the undertaking of protective works where appropriate. The problems of shoreline management are continuous ones. Acquisition of erosion endangered or flood damaged properties must be allowed for on a continuous basis. Also, areas along the Metropolitan Toronto region waterfront presently exist where protective works can be justified in accordance with Authority policies. Adequate provision is required for shoreline manage- ment on an ongoing basis to, first; ensure the safety of residents, and secondly; to minimize the aggravation of present problems and thus the escalation of costs in the future. 3. COST /FINANCING: To carry on these three essential works, supplementary funding at a level of $992,000. per year for 1979, 1980, and 1981 is required. H -14 4 For purposes of raising the supplementary funds, Metropolitan Toronto would be named as 'benefiting municipality' with matching funds from The Province of Ontario. PROVINCE METROPOLITAN OF YEAR TORONTO ONTARIO TOTAL 1979 $ 496,000. $ 496,000. $ 992,000. 1980 $ 496,000. $ 496,000. $ 992,000. 1981 $ 496,000. $ 496,000. $ 992,000. This need for supplementary funding was recognized by the Council of Metropolitan Toronto in their approval of the acquisition of the Guild Inn (May 30, 1970), where, in part, the following was approved: "(5) Council request The Metropolitan Toronto and Region Conservation Authority to prepare a supplementary Waterfront Project indicating an additional sum of $496,000. as the Metropolitan share in each of the years 1979, 1980, and 1981, and the Metropolitan Toronto Capital Works Programme be amended to include this project;" With the addition of this supplementary funding, total funding for the remainder of the Waterfront Project 1977 -1981 would approximately be as follows: 1979 $ 3,600,000. 1980 $ 3,600,000. 1981 $ 3,600,000. 4. OTHER GENERAL REMARKS: As this is a Supplementary Project to the approved Metropolitan Toronto and Region Waterfront Project, 1977 -1981, the policies, procedures, and intent of the Waterfront Project, 1977 -1981, will apply equally to the Supplementary Project. 1978.08.16./K SCHEDULE "B" H -15 TO: THE CHAIRMAN AND MEMBERS OF THE WATERFRONT ADVISORY BOARD M.T.R.C.A. - Meeting #2/78 RE: 1979 BUDGET ESTIMATES Attached are the 1979 Budget Estimates for the continuation of the 1977-1981 Waterfront Project. A brief description of the proposed work program is included and additional details will be available at the meeting. RECOMMENDATION: The Board recommends that the 1979 Budget Estimates for continuation of the 1977 -1981 Waterfront Project be approved. M.R. Garrett Administrator Water Resource Division 1978.08.28 BD : ds PROGRAM 1979 CURRENT BUDGET ESTIMATES Water & Related Land Management - Waterfront_ Programs IW9) PURPOSE: To provide administrative, planning and engineering staff necessary for implementing the Waterfront project. PAGE FUNDING: This is a shared program, 55% of the funds being available from the Province of Ontario and the balance being funded from the General Levy on all participating municipalities. OBJECTIVE CLASSIFICATIONS: Salaries & Wages 56,525 Materials Supplies & Real Services Financial Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ 3,475 - - 60,000 PROGRAM 1979 CURRENT BUDGET ESTIMATES Water & Related Land Management - Waterfront Programs (W9) Activity Staff Salaries Staff Travel & Expen i TOTAL 60,000 60,000 SOURCES OF FINANCING 1979 BUDGET Expenditures Revenues Net Expenditures es 56,525 3,475 - - 56,525 3,475 60,000 60,000 SOURCES OF FINANCING Provincial Grant Municipal Levy Other 31,090 1,910 . 25,435 .1,565 - - . 33,000 27,000 . . 1978 ACTUALS Expenditures Revenues . . 1978 PAGE BUDGET Expenditures Revenues 56,525 3,475 60,000 1 1979 CAPITAL BUDGET ESTIMATES PROGRAM Special Projects - Waterfront Plan PURPOSE: 1979 OBJECTIVES: FUNDING: Revised: 8/17/78 PAGE W 1 co The purpose of the Waterfront Plan is to create, on the Lake Ontario shoreline within the area of the Authority's jurisdiction, a handsome waterfront balanced in its land uses which will complement adjacent areas, taking cognizance of existing residential development and making available, wherever possible, features which warrant public use. -the completion of the landfill project at Humber Bay West Phase II - the continuation of the landfill project at Bluffers Phase II and construction of launching and parking facilities - the completion of development at Humber Bay East -the continuation of design of improved facilities for the Western Beaches - the continuation of the environmental monitoring program - the start of landfilling for Colonel Samuel Bois Smith Waterfront Area -the continuation of acquisition of endangered homes and construction of priority works relating to Shoreline Management -the continuation of the regular acquisition program This is a shared program; a grant of 50% of costs is available from the Province of Ontario, the balance being funded by the Waterfront Capital Levy on all participating municipalities. The Government of Canada is constructing shore protection at the Small Craft Harbour at Bluffer's Park. FINANCIAL COMMENTS: 1979 is the third year of the second five -year project for Waterfront Development and the estimates are based on the available cash flow from the Province of Ontario. OBJECTIVE CLASSIFICATIONS: Materials Salaries Supplies & Real Services Financial & Wages Utilities Equipment Property & Rents Taxes Expenses Total $ $ $ $ $ $ $ $ 65,000 440,000 3,095,000 - 3,600,000 PROGRAM 1979 CAPITAL BUDGET ESTIMATES SPECIAL PROJECTS - WATERFRONT PLAN Activity Humber Bay West Humber Bay East Western Beaches Ashbridge's Bay Bluffer's Park East Point Park Environmental Studies and Monitoring Shoreline Management Staff Salaries Land Acquisition Mapping Colonel Samuel Bois Smith Petticoat Creek Maintenance i TOTAL / ` 1979 BUDGET Expenditures Revenues Expenditures 150,000 - 150,000 1,025,000 - 1,025,000 50,000 - 50,000 30,000 - 30,000 740,000 - 740,000 100,000 - 100,000 450,000 - 450,000 65,000 - 65,000 340,000 - 340,000 580,000 - 580,000 20,000 - 20,000 50,000 - 50,000 . . 3,600,000 3,600,000 i SOURCES OF FINANCING 1978 ACTUALS Provincial Grant Municipal Levy Other Expenditures Revenues 75,000 7,000 - 352,000 512,500 512,500 - 100,000 25,000 25,000 - 1,259,000 15,000 1-5,000 - 90,000 370,000 X70;000 - . 50,000 - 50:, 000 - 225,000 225,000 - 32,500 32,500 - 170,000 170,000 - 290,000 290,000 - 10,000 10,000 - 25,000 25,000 - PAG E / . 1978 BUDGET Expenditures . .I, 1,800,0001,800,000 - 70,000 352,000 . 69,000 PAG E / . 1978 BUDGET Expenditures Revenues 280,000 373,000 50,000 70,000 352,000 69,000 100,000 175,000 80,000 1,259,000 1,000 90,000 15,000 . . 2,914,000 i H -20 SCHEDULE "C" TO: THE CHAIRMAN AND MEMBERS OF THE WATERFRONT ADVISORY BOARD MTRCA - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector I Introduction At Meeting #4/77 the Waterfront Advisory Board made the following recommendation: THE BOARD RECOMMENDS THAT: The Shoreline Management Plan be adopted and the following action be taken: (a) The priorities for 1978 shore protective works be approved, (b) The staff be directed to evaluate in detail the landfill alternative and other promising alternatives for shore protection and report back to the Board, and (c) The staff evaluate the type and quantity of plant materials which would be appropriate for bank stabilization projects and report back to the Board. Subsequently, this course of action was approved by the Executive Committee at Meeting #1/78 and by the Authority at Meeting #2/78. The purpose of this report is to present the preliminary results of the investigation of the landfilling alternative as requested in item (b) of the recommendation. The information presented has been compiled over the period Feb. 10, 1978 to August 22, 1978 principally by the Toronto Harbour Commissioners Engineering Department at the request of the Authority. II BACKGROUND (i) Erosion Problem Numerous previous reports have identified the patterns of erosion along Scarborough Bluffs. Professor Coleman's survey completed in 1913 showed that the Bluffs had been receding an average 24.7m in 50 year (49.4cm /year) (1.62ft /year). A comparison of The Toronto Harbour Commissioners 1922 survey and the Scarborough Township Engineers 1952 survey indicated that the Bluffs had retreated an average of 39.6cm /year. (1.3ft /year). Over the last few years, certain sections of the Bluffs have receded at much faster rates. For example, at the foot of Kildonan Drive, the recession has averaged 1.5m /year (4.9ft /year) between 1972 and 1976. A recent Authority report illustrated that if Bluff erosion continues indefinitely at relatively the same rate as over the last 70 years, the losses will be significant. A potential loss of 150 houses as well as 50 acres of private land and 25 acres of public land over the next 75 years is a very real possibility. (ii) Factors Contributing to Bluffs Erosion Numerous previous reports have attempted to describe the various mechanisms of bluff erosion. The principal factors are understood to be weathering, groundwater flow emerging onto the bluff face and wave action at the toe of the Bluffs. The latter factor, wave action, is the most serious as it undercuts the bluff toe and steepens the Bluff profile even further. When the Bluff fails (which can be considered a natural process of stabilization) wave action removes the debris and re- steepens the Bluff. TO: The Chairman and Members of the Waterfront Advisory Board MTRCA - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector Page 2 H -21 (iii) Authority Responsibilities The 1977 -1981 Waterfront Project proposed that the Authority would implement a shoreline management programme that among other components would contain schemes for structural protection to limit erosion at the land /water interface, thereby controlling the most important factor in bluff erosion. The Shoreline Management Plan received by the Waterfront Advisory Board at Meeting #4/77 identified specific criteria for the implemen- tation of this structural component of the programme. (iv) Alternatives Considered A firm policy with regard to shoreline protection combined with an understanding of the erosion mechanisms has lead to consideration of a wide range of shore protective techniques. The available conventional techniques of off -shore breakwaters, groynes, beach feeding, seawalls, and revetments were all found to be very expensive given the constraints of limited access for handling materials. The access limitations and resultant high construction costs lead to consideration of a means of providing access to the shoreline for trucks. If the shoreline construction access route is technically and politically feasible, then the wave erosion could be controlled with a system of artificial beaches similar to that used on existing Authority landfill projects. III ARTIFICIAL BEACH STABILIZATION INCORPORATING SHORELINE LANDFILLING (i) Design Considerations In order to design a system of artificial beaches to stabilize the toe of Scarborough Bluffs, the following data is required: 1. Bluff slope realignment in absence of waves - This information is required to determine the amount of talus material which will continue to slough from the bluff face and accumulate at the toe even after the toe is protected. This information assists in the compilation of the amount of storage area required and therefore in determining the alignment of the toe protection. By using the natural accretion of talus material in the design, the amount of recession of the top of the bluff that will occur after toe protection is installed is kept to a minimum. The analysis to date shows that the toe protection should not be closer than approximately 20 metres to the existing toe of bluff to allow sufficient storage for talus material. 2. Nearshore Bathymetry - This information on water depth and bottom configuration is also useful in calculating the storage capacity for talus material. In addition, it is used in the analysis of the wave attack approach angle to determine the stable beach configuration. 3. Wave Climate - This data is important in determining the stable beach angle which is critical to the success of the scheme. The direction of approach and energy of the waves assist in determining the optimum balance between beach anchor lengths and their spacing. This balance affects the total cost of the scheme significantly. The analysis to date indicates that the best system for the Bluff area would utilize groyne -type beach anchors with a minimum length of 35m (115. feet). The anchors would be spaced 122m (400 feet) apart and an artificial beach would be constructed and nourished between these anchors. It is estimated that the average beach configuration will be approximately 16 degrees different from the existing configuration and that the beach may shift approximately 5 degrees in either direction from the average under a certain storm condition. H -22 TO: The Chairman and Members of the Waterfront Advisory Board MTRCA - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector Page 3 (ii) Construction Techniques 1. Core The proposed rockmound groynes (beach anchors) and artificial beaches involve delivery and placement of large quantities of materials. It is proposed that surplus construction excavation material (clean fill and concrete and asphalt rubble) will be used to build a road for this purpose. Since the road serves as an integral part of the stabilizing structure, its width, elevation, curvature and strength are to serve this purpose. The core of the structure is proposed to consist of earth fill (fines) and therefore must be kept a safe distance shoreward of the most landward orientation of the beach. Other surplus material, primarily concrete and asphalt, which consist of larger aggregates is to be placed on the lakeward side of the core. Experience on existing landfill sites has shown that this material deteriorates under wave action and yields aggregates for beach material. On the average, rubble suitable for beach material comprises 10 to 20 per cent of the total volume of available surplus construction material. 2. Beach Material It is estimated that only about one -third of the necessary beach material requirements could be met with rubble from local construction sites. The remainder must be obtained from gravel or stone quarries. Investigations to date have concluded that the additional purchased material should be a graded mixture of 10 to 80 mm. diameter (3/8" to 3 ") stone. It is to be dumped reasonably evenly along the proposed beach sector of each unit. The winter storm waves are expected to distribute the material as required. 3. Groyne Armour (Beach Anchors) It is anticipated that the beach anchors will be constructed using a standard technique of a quarry stone core protected with at least one layer of primary armour stone. This material would be delivered by truck from various access points along the haul road along the toe of the bluffs. (iii) Proposed Access Points A previous report to the Waterfront Advisory Board Meeting #4/77 identified the possibility for shoreline access from the following points: - easterly from the R.C. Harris Plant - westerly and easterly from a proposed new access adjacent to Rosetta McLain Gardens. - westerly and easterly from Bluffer's Park - westerly and easterly from the Guild Inn area - westerly from East Point Park Further analysis has shown that a programme of landfilling originating at these points to create a system of artificial beaches appears to be feasible and warrants testing. The accompanying plan identifies the locations of these access points and the directions in which filling would proceed if the complete scheme is implemented. To gain access at a reasonable slope to the shoreline from Authority property adjacent to Rosetta McLain Gardens, a substantial cut of the bluff face combined with filling in the lake would be required. Access at other locations would not be as difficult. TO: The Chairman and Members of the Waterfront Advisory Board MTRCA - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector Page 4 H -23 (iv) Construction Programme Since several of the high priority areas require access from the Rosetta McLain Gardens area, the timing for construction in that area has been examined first. It is estimated that the construction would proceed as follows: Year 1 Sewer - Extend Lakehurst Crescent storm sewer outlet during June, July, and August. Access Road - Excavate table land from early May to mid June. Receive fill from Metro's excavation sites, starting mid June. Prearmour fill before ceasing filling operations for winter, at end of October. Year 2 Access Road - Complete base for access road filling between May and July. Armour toe of access road fill August and September. Beach Construction - Start in August. Complete two units, including armouring of groynes, not later than end of October. Year 3 Beach Construction - Complete four, possibly five, additional beach units between May and October (foot of Kildonan Drive reached). Year 4 Beach Construction - Resume in May. Complete remaining 3 or 4 beach units east of Warden Avenue by fall. Several of the high priority areas could therefore be reached and protected within the first four years. Construction in other areas would proceed as availability of fill materials and funds permitted. (v) Cost Estimate - Warden Avenue to Wynnview Crescent Cost estimates for the top pripr•ity Warden Ave.- Wynnview Crescent des- section consist of two parts - access road and shore protection construction. 1. Access Road Excavation and Filling Shoreline Armouring Sewer Outlet Extension Road Construction Total 2. Shore Protection 122 m (400') Unit Beach: Core Filling Groyne Armouring Beach Feeding + 15% Contingencies + 10% Engineering Total for 122 m $ 688,000 154,000 400,000 92,000 $1,334,000 $ 10,880 32,190 24,000 $ 67,070 10,060 $ 77,130 7,713 $ 84,843 Total for 1,433 m shoreline: $84,843 x 1,433 m 122 m TOTAL FOR THIS SECTION: $2,330,558 = $996,558 H -24 TO: The Chairman and Members of the Waterfront Advisory Board MTRCA - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector Page 5 Costs - East of Bluffers Park The Brimley Road access may be used advantageously to build sections of the artificial beaches east of the Bluffers Waterfront Area. Applying theunit beach prices derived above, a shorter section of 975 m would cost about $680,000 and reach the ravine west of the Meadowcliffe Drive. A longer test section of 1,640 m would cost about $1,100,000 and reach the Bellamy Ravine. Preliminary cost estimates for the remainder of the Bluff area requiring protection have also been prepared bringing the total for shore protection alone to $8,770,000. As noted above, the cost of creating an access near Rosetta McLain Gardens is estimated at $1,334,000. An additional allowance of $250,000 can be made for access improvements at other locations bringing the total estimated cost of the scheme including access and protective structures to approximately $10,350,000. The unit price for the 12.5km protected therefore, is estimated at approximately $830/m ($250 /ft.). (vi) Other Considerations As long as fill is being received at Bluffer's Park, it is unlikely that a sufficient volume of material would be available for shoreline management. However, Bluffer's Park landfilling should be completed by sometime in 1980 and a suitable use of surplus construction material for the period after 1980 should be found. A careful coordination of fill requirements between Bluffer's Park, East Point Park and Shoreline Management is required. A plan of this type and magnitude will require approval under the Environmental Assessment Act. The potential for recreational use of the resulting shoreline lands and access has not as yet been assessed. The shoreline access route would be valuable to abutting private property owners for use during implementation of bank stabilization schemes upon completion of toe protection. A charge could be levied for receipt of fill, thereby producing revenue to offset the costs of the development. A careful examiniation of the effect of the charge on available material quantities would be essential. While a detailed master plan for the artificial beaches scheme of protection is being prepared, approved, and implemented, some local erosion hazards will become increasingly serious. IV CONCLUSIONS 1. The completion of the preliminary evaluation has shown that the use of landfilling in the creation of a system of artificial beaches for protection of Scarborough Bluffs is feasible. 2. A Master Plan for the scheme will be required and consistent with Authority policy will require approval by the Borough of Scarborough Metropolitan Toronto and the Province of Ontario. TO: The Chairman and Members of the Waterfront Advisory Board M.T.R.C.A. - Meeting #2/78 RE: Shoreline Protection - Scarborough Sector Page 6 H -25 3. A short test section should be installed as soon as possible in order to verify beach configurations, construction timing and cost estimates. 4. While the Master Plan is being prepared, the approved short term program of acquisition of endangered houses and protection of criticial areas, should continue in accordance with approved priorities. RECOMMENDATIONS: THE BOARD RECOMMENDS THAT: The staff report on Shoreline Protection - Scarborough Sector be received and THAT the staff be directed to proceed with the preparation of a detailed Master Plan, including environmental assessment, for the protection of the Scarborough shoreline by means of a system of artificial beaches, and THAT a short test section be installed in 1979, funds permitting, at a location to be selected as soon as possible, and THAT in the interim, acquisition and protection of critical areas continue in accordance with existing Authority policy. M.R. Garrett Administrator Water Resource Division 1978.08.28 BED:dms Attach. KINGSTON /11 tIWA efre /4/1 + • 040/ tr 0 MUD S- I S' 2 S- 3 S-4 1 S -5 ; S -6 1 1 S-7 011C0][0Z011[0111111111111110 D O 'KINGSTON RD A. � ‘5, �� 1 SYl ` �wY S- 8 1 1 S -9 S -10 S -11 ® MAJOR POTENTIAL SHORELINE MANAGEMENT ACCESS DI PRIORITY FOR PROTECTION the metropolitan toronto end region conservation authority SCARBOROUGH SECTOR SHORELINE MANAGEMENT PROGRAMME JANUARY H70 SCALE f-tono' MAP N*0 1 ® MAJOR POTENTIAL SHORELINE MANAGEMENT ACCESS OPRIORITY FOR PROTECTION the metropolitan toronto and region conservation authority SCARBOROUGH SECTOR SHORELINE MANAGEMENT PROGRAMME x I JANUARY M7$ SCALE f -2000' MAP NO 7 N v