HomeMy WebLinkAboutFlood Control & Water Conservation Advisory Board 1965
mtropo&lan Jol'Onlo and Retfon
CMervation Atkorit'! C-l
MINUTES
Flood Control & Water Conservation A.B. Thursday-Apri1-l-l965 #1/65
The Flood Control and Water Conservation Advisory Board met jointly
with the Etobicoke-Mimico Advisory Board in the Board Room, Authority
Office, #7 Highway, on Thursday, April 1, 1965, commencing at 2:00
p.m.
FLOOD CONTROL A.B.
MEMBERS PRESENT:
Chairman R.G. Henderson
Vice-Chairman W.J. Haggart
Members C.A. Balsdon
W.C. Davidson
J.N.Duncan
C.F. Kline
Mrs. G. Klinck
F.J. McKechnie
Authority Chairman Dr. G. Ross Lord
Secretary-Treasurer F.L. Lunn
Director of Operations K.G. Higgs
Asst.Dir. of Operations E.F. Sutter
Development-Co-Ordinator R. Cunnington
Representatives of: M.M. Dillon Limited
MINUTES
The Minutes of Meeting #3/64 were presented.
lies. #1 Moved by: W.J. Haggart
Seconded by: J.N. Duncan
RESOLVED THAT: The ~tinutes of Meeting #3/64, as presented, be
adopted as if read.
CARRIED UNANIMOUSLY;
STAFF PROGRESS REPORT
A detailed Staff Progress Report, to date, was presented and con-
sidered in detail.
Res. #2 Moved by: G. Ross Lord
Seconded by: J.N. Duncan
RESOLVED THAT: The Staff Progress Report, as presented, be received.
CARRIED UNANIMOUSLY;
ETOBICOKE CREEK WATERSHED REPORT
The Report of the Etobicoke Creek Watershed was presented to the
joint meeting by representatives of M.M. Dillon Limited. The Report
was discussed in detail.
Res. 113 Moved by: C.F. Kline
Seconded by: W.C. Davidson
THE BOARD RECOMMENDS THAT: The Preliminary Engineering Report, t1A
Study of the Etobicoke Creek Watershedli, as prepared by M.M. Dillon
Limited, be approved in principle; and further, that the following
action be taken:
C-2 -2-
1. Copies of this Report be forwarded to the Conservation Authorities
Branch, Ontario Department of Energy & Resources Management, for
approval;
2. Copies of this Report be made available to the Municipalities of
Metropolitan Toronto, The Town of Brampton, Township of Etobicoke,
Township of Toronto and Township of Chinguacousy, The Air Services
Branch, Canada Department of Transport and The Ontario Water Re-
sources Commission, for their consideration;
3. With regard to the specific recommendations contained in this
Report, the following policy be adopted:
(a) The Staff be instructed to strictly enforce any and all
Authority Regulations relating to the dumping of fill
and/or the erection of structures within the flood lines
as shown on Plates 13 to 41 of this Report;
(b) Application be made to The Province of Ontario for
approval of the Snelgrove Dam and Reservoir in accord-
ance with the Provincial policy for assistance with
water supply reservoirs;
( c ) No further consideration be given at this time to the
proposed Elmbank Dam and Reservoir;
(d) The Metropolitan Toronto Planning Board, in co-operation
with The Townships of Etobicoke, Toronto and other
organizations concerned, be requested to study and make
recommendations concerning the relative merits of Scheme
1 as compared to Scheme 2 for Channel Improvements in
the Dundas Street-Somerville area, taking into account
all the implications of potential development in that
general area;
(e) The smaller channel improvements works and bank
stabilization projects be undertaken over an extended
period of years under a continuing programme of
Winter Works.
CARRIED UNANIMOUSLY;
R Jl4 Moved by: F.J. McKechnie
e s. 1f
Seconded by: W.C. Davidson
RESOLVED THAT: The representatives of M.M. Dillon Limited be con-
gratulated on the comprehensive nature of the Report on the Etobicoke
Creek Watershed and their method of presentation.
,_qARRIED UNANIMOUSLY;
ADJOURNMENT
On Motion, the Meeting adjourned at 4:45 p.m.
R.G. Henderson F.L. Lunn
Chairman Secretary-Treasurer
-.
rfIetropo&lan Jol'Onlo and Reijion
Cn4ervalion -Authorit'j C-3
MINUTES
Flood Control & Water Conservation A.B. Tue-Nov-2-l965 #2/65
The Flood Control and Water Conservation Advisory Board met in the
Board Room, Authority Office, #7 Highway, on Tuesday, November 2,
1965, commencing at 2:00 p.m.
PRESENT WERE
Chairman, Advisory Board R.G. Henderson
Vice-Chairman W.J. Haggart
Authority Chairman Dr. G. Ross Lord
Members C.A. Balsdon
W.C. Davidson
Mrs. G. Klinck
C.F. Kline
C.W. Laycox
A.A. Mackenzie, MPP
F.J. McKechnie
V. Vign-ale
K.G. Waters
Secretary-Treasurer F.L. Lunn
Director of Operations K.G. Higgs
Asst. Dir. of Operations E. F.' Sutter
MINUTES
The Minutes of Meeting #1/65 were presented.
Res. #5 Moved by: W.J. Haggart
Seconded by: C.F. Kline
RESOLVED-THAT: The Minutes of Meeting #1/65, as presented, be
adopted as if read.
CARRIED UNANIMOUSLY;
STAFF PROGRESS REPORT
Mr. Sutter presented a detailed Staff Progress Report, to date.
Res. #6 Moved by: F.J. McKechnie
Seconded by: C.F. Kline
RESOLVED THAT: The Staff Progress Report, as presented, be received.
CARRIED UNANIMOUSLY;
ETOBICOKE CREEK - VICINITY OF DUNDAS STREET
Res. 1/:7 Moved by: F.J. McKechnie
Seconded by: V. Vignale
RESOLVED THAT: The Township of Etobicoke and The Metropolitan
Torontv Planning Board be urgently requested to provide the results
Of their study of the alternate channelization proposals for the
Etobicoke Creek in the vicinity of Dundas Street.
CARRIED UNANIMOUSLY;
TELEMETERING & SUPERVISORY CONTROL SYSTEM
Res. #8 Moved by: C.F. Kline
Seconded by: F.J. McKechnie
C-4 -2-
THE BOARD RECOMMENDS THAT: An item of $10,000.00 be included in the
1966 budget estimates of the Authority, for the extension of the
flood warning system to be used specifically for engineering and
technical studies in connection with the proposed Telemetering,
Supervisory Control and Communications System.
CARRIED UNANIMOUSLY;
UNDERGROUND WATER SUPPLIES - STOUFFVILLE AREA
A Staff communication was presented, quoting the Resolution of the
Reforestation & Land Use Advisory Board, recommending that the
Ontario Water Resources Commission be requested to undertake a study
of underground water supplies in the vicinity of Stouffville.
Res. #9 Moved by: K.G. Waters
Seconded by: V. Vignale
THE BOARD RECOMMENDS THAT: Res. #14/65 of the Reforestation and Land
Use Advisory Board, which reads:
"The Ontario Water Resources Commission be requested to undertake a
study of underground water supply in the vicinity of Stouffville, in
the headwaters of the Rouge and Duffin Creeks, with a view to con-
servation of existing underground water supplies and mitigating
present waste.1I
be adopted.
CARRIED UNANIMOUSLY;
PROGRESS REPORT - PLAN FOR FLOOD CONTROL
AND WATER CONSERVATION
The Staff presented a Progress Report for Flood Control and Water
Conservation.
Res. #10 Moved by: W.J. Haggart
Seconded by: Mrs. G. Klinck
RESOLVED THAT: The Progress Report for Flood Control and Water
Conservation be received.
CARRIED UNANIMOUSLY;
PROPOSED 1966 BUDG~
Proposals for the 1966 Budget for General Water Control Schemes
were discussed in some detail.
Res. #11 Moved by: V. Vignale
Seconded by: C.W. Laycox
THE BOARD RECOMMENDS THAT: The following items be included in the
1966 budget for General Water Control Schemes:
Extension of Flood Warning System $ 10,000
Engineering Study 5,000
Streambank Erosion Control 5,000
Stouffville Water Conservation Reservoir 150,000
TOTAL i 1~0 000
CARRI D NKNIMOUSLY;
REVISED COST ESTIMATES - FLOOD CONTROL PLAN
A complete summary of revised cost estimates of the Flood Control
Plan, as of December 31, 1964, was presented.
Res. #12 Moved by: W.J. Haggart
Seconded by: F.J. McKechnie
RESOLVED THAT: The revised cost estimates for the Flood Control Plan
as of December 31, 1964, be received; and further,
-3- C-5
THE BOARD RECOMMENDS THAT: The Staff be authorized and directed, at
as early a date as possible, to provide up to date estimates as of
December 31, 1965, and to include in the said estimates a breakdown
of land and construction costs.
CARRIED UNANIMOUSLY;
PLAN FOR FLOOD CONTROL AND WATER CONSERVATION
SCHEDULE OF DAMS - HUMBER WATERSHED
The matter of the proposed scheduling of various dams on the Humber
Watershed, as considered by this Advisory Board, the Humber Valley
Advisory Board and the Executive Committee, and referred to this
Board, was discussed at some length.
Res. #13 Moved by: F.J. McKechnie
Seconded by: W.J. Haggart
THE BOARD RECOMMENDS THAT: The remaining dams planned for the
Humber Watershed be constructed in the following order:
1) Bolton Dam & Reservoir
2) King Creek Dam & Reservoir
3) Ebenezer Dam & Reservoir
4) Boyd Dam & Reservoir
5) Nashville Dam & Reservoir
CARRIED UNANIMOUSLY;
ADJOURNMENT
On Motion, the Meeting adjourned at 4:45 p.m.