Loading...
HomeMy WebLinkAboutFlood Control & Water Conservation Advisory Board 1962Metropolitan, Joronto and Ieeion Con,iervation �ui�xoritr� MINUTES c -1 Flood Control & Water Conservation Advisory Board Meeting 1/62 The Flood Control and Water Conservation Advisory Board met in the Board Room, 17 Mill Street, commencing at 12:00 noon, on Tuesday, June 19th, 1962. PRESENT WERE: Authority Chairman Advisory Board Chairman Advisory Board Vice Chr. Members Dept. of Lands & Forests Dept. of Lands & Forests Director of Operations Asst. Dir. of Operations Secretary- Treasurer Dr. G. Ross Lord R. G. Henderson W. J. Haggart H. M. Griggs C. H. Hiscott .R. E. Jones F. Kline A. Macdonald A. E. Reeve J. S. Scott A. S. L. Barnes J. W. Murray K. G. Higgs E. F. Sutter F. L. Lunn MINUTES: The Minutes of Meeting Nb. 3/61 were presented. Res. j1 Moved By:- W. J. Haggart Seconded By:- C. F. Kline RESOLVED THAT:- the Minutes ofMeeting No. 3/61 as presented, be adopted. Carried Unanimously. STAFF PROGRESS REPORT: Mr. Sutter presented the Staff Progress Report for the period of January 1st, 1962 to June 15th, 1962. Res. #2 Moved By:- C. H. Hiscott Seconded By:- R. E. Jones RESOLVED THAT:- the Staff Progress Repo rt for the period of January 1st to June 15th, 1962, be received, and appended as Schedule SQAf' of these Minutes. Carried Unanimously. MEETING NO. 2/62: It was agreed that the Board would meet for an all -day Meeting, commencing at 10:00 a.m. on Tuesday, August 14th, 1962, to receive the Engineering Report on the Duffin's Creek Watershed and the York Mills Channel of the Don River, and to carry out a Field Inspection of the two projects. STAFF REPORT: Res. #3 Moved By:- A. E. Reeve Seconded By:- C. H. Hiscott RESOLVED THAT:- the Staff prepare, and submit to C -2 -2 - the Board every two months a Progress Report on projects of interest to the Board. Not Carried. FIELD INSPECTION: The Meeting adjourned at 1:15 p,.m. to partake of a Field Inspection of the following projects presently in progress: (a) Lower Highland Creek (b) Lower Humber River (c) Black Creek (d) Woodbridge Channelization R. G. Henderson F. L. Lunn Chairman Secretary- Treasurer SCHEDULE i?A'? C -3 FLOOD CONTROL & WATER CONSERVATION PROGRESS REPORT -- Januar 1st to June 1 th 1 6 BLACK CREEK CHANNEL Scarlett Road to Rockcliffe Blvd): - construction is approximately 30% complete; BLACK CREEK CHANNEL Rustic Road to Wilson Avenue: - plans and specifications for this section are now complete and awating the approval of the Federal Government; - property surveys are proceeding; BLACK CREEK CHANNEL (Remaining Sections): -final design is now in progress; -staff are preparing a preliminary property plan; YORK MILLS CHANNEL: - preliminary engineering is now complete in draft form; WOODBRIDGE CHANNEL: - construction is 25% complete; DON WATERSHED: - preliminary engineering study for Reservoirs on the Don Watershed proceeding -- will be complete in approximately five weeks; HUMBER WATERSHED: - preliminary engineering study of Reservoir Sites on Main and East Branches of the Humber is underway; CLAIREVILLE RESERVOIR: - design engineering is in progress; - property acquisition is proceeding; - negotiations proceeding with Etobicoke Twp. and C.N.R. for diversion of Indian Line; EBENEZER RESERVOIR: - preliminary engineering study is nearly complete; DUFFIN CREEK WATERSHED: - preliminary engineering study of Reservoir Sites on Duffin Creek is complete in draft form; MILNE RESERVOIR: =engineering study for design of dam is now in progress; - property negotiations are proceeding; SNELGROVE RESERVOIR: - preliminary property plan for Snelgrove Reservoir has been approved by the Province; - surveys and property negotiations are in progress; - engineering study for the Dam has commenced; FLOOD PLAIN AND VALLEY L..NDS: Eglinton Flats -- acquisition of lands is proceeding; Lower Rouge Valley -- property surveys and negotiations proceeding; C -4 Lower Duffin -- acquisition of lands under active negotiation; Don Valley (formerly W.C.14) -- acquisition now nearly complete; Highland Creek (formerly W.C.23) -- property negotiations just commencing; Duffin Creek -- Riverside Drive Area -- Staff are preparing a preliminary property plan; MIMICO CREEK ENGINEERING STUDY: - study has been approved by the Province and will commence immediately; STOUFFVILLE STUDY: - Province has approved engineering study for new culvert structure at Main Street; - preliminary property plan of flood plain lands is nearly complete; W.C. -34 -- CHANNEL IMPROVEMENTS: - Highland Creek portion 70% complete; - Humber River portion complete; - work suspended until Fall; 11.11.7.25 -- EXTENSION TO FLOOD WARNING SYSTEM: - Sdeme has now been approved by the Province; FLOOD CONTROL PLAN -- SUMNhRY OF LAND ACQUISITION TO DATE: Claireville Reservoir -- 293 acres Ebenezer Reservoir -- 19 acres Bolton Reservoir -- 237 acres Willowdale Reservoir -- 13 acres Finch Reservoir -- 40 acres Milne Reservoir -- 1$4 acres Snelgrove Reservoir -- 90 acres Woodbridge Channel -- 60 acres Black Creek Channel -- 20 acres Etobicoke Flood Plain Lands -- nil Mimico Creek Flood Plain Lands -- 4 acres Humber Flood Plain Lands -- 130 acres Don Flood Plain Lands -- 230 acres Highland Creek Flood Plain Lands -- Nil Rouge Flood Plain Lands -- 2 acres Duffin Flood Plain Lands -- 105 acres Total Acreage -- 1,467 acres Vetropo/ttaFi Joronto and kejon Con$eruation ...Attihori %y MIle1UTES C -5 Flood Control & Water Conservation Advisozy Board Meeting No. 2/62 The Flood Control and Water Conservation Advisory Board met in the Board Room, 17 Mill Street, commencing at 10:00 a.m. on Tuesday, August 14th, 1962. PRESENT WERE: Authority Chairman Advisory Board Chairman Vice Chairman Members Secretary- Treasurer Director of Operations Asst. Dir. of Operations Lands & Forests W. 0. Chisholm Associates Dr. G. Ross Lord R. G. Henderson W. J. Haggart W. C. Davidson C. H. Hiscott R. E. Jones C. F. Kline A. MacDonald F. McKechnie A. E. Reeve J. S. Scott V. Vignale F. L. Lunn K. G. Higgs E. F. Sutter F. Forbes W. 0. Chisholm MINUTES: The Minutes of Meeting No. 1/62 were presented. Res. #4 Moved By:- C. H. Hiscott Seconded By:- W. J. Haggart RESOLVED THAT:- the Minutes of Meeting No. 1/62 as presented, be adopted. Carried Unanimously. STAFF PROGRESS REPORT: The Staff Progress Report was presented by the Director of Operations. Res. #5 Moved By:- F. McKechnie Seconded By:- V. Vignale RESOLVED THAT:- the Staff Progress Report be received and appended as Schedule "An of these Minutes. Carried Unanimously. PROJECT F.12 -- YORK MILLS FLOOD CONTROL CHANNEL: Mr. W. 0. Chisholm presented a report on the York Mills Flood Control Channel. Res. #6 Moved By:- C. F. Kline Seconded By:- R. E. Jones THE BOARD RECOMMENDS THAT:- (a) the Preliminary Engineering Report for the York Mills Channel Improvements -- Donino Avenue to the Rosedale Golf Club -- as prepared by W. 0. Chisholm Associates be approved as presented; 0 -6 - 2 - (b) THAT the report be submitted to the Conservation Authorities Branch of the Department of Lands and Forests for approval; (c) THAT the Staff be authorized and instructed to proceed with negotiations for the acquisition•of the necessary lands for this project for a nominal sum; (d) THAT a meeting of all property owners affected be called to present the plan; (e) THAT until the negotiations referred to in recommendation (c) have been satisfactorily completed, no further steps be taken to implement the recommendations contained in the Chisholm report. Carried Unanimously. SCHEME W.C. -36 -- PMASSEY CREEK CHANNEL IMPROVEMENTS: The Director of Operations presented a report dealing with the proposed Scheme. Res. 77-7 Moved By:- J. S. Scott Seconded By :- A. MacDonald THE BOARD •. C =DS THtt :- (a) the Authority assume responsibility for Flood Control and Channel Improvements for the Massey Creek from the confluence of the Massey Creek with the Main Branch of the Don River to the South side of St. Clair Avenue East, immediately West of Warden Avenue; (b) THAT the Channel Improvements proposed for this section of the Massey Creek by R. V. Anderson & Associates be not approved; (c) THAT Channel Improvements in this section of the Massey Creek be designed in such a way that the natural conditions of the stream will be retained; THAT the flood plain of the valley lands shall be used for flood storage; THAT where necessary the stream will be straightened and eroded cut banks will be protected by use of gabions, and where necessary gabion drop structures will be constructed; (d) THAT the Staff be authorized to obtain a proposal from R. V. Anderson & Associates for the final design of Channel Improvements to be constructed on the Massey Creek in accordance with recommendation (c); (e) THAT the Authority undertake improvements to the Massey Creek;progressively over a number of years as funds are made available, and that these works be constructed under the Winter Works Incentive Programme; (f) THAT the Authority adopt Scheme W.C. -36, 'oA Scheme for the Improvement of the Channel of the Massey Creek•', and further in this connection, that the following action be taken: (i) THi,T the Municipality of Metropolitan Toronto be designated as the Benefitting Municipality; (ii) THAT the Minister of Lands and Forests be requested to approve of the Scheme and a Grant of 50% of the cost thereof; - 3 - (iii) THAT a copy of the Scheme be forwarded to the Municipality of Metropolitan Toronto and that no action be taken on the Scheme until such time as it is accepted and approved by the said Municipality; iv) THAT when approved, the appropriate Authority officials be authorized and directed to take whatever action is required in connection with the Scheme, including the execution of any necessary documents; (v) THAT the works included in Scheme W.C. -36 be submitted to the Provincial and Dominion Governments requesting approval of the works contained in the Scheme as a Winter Works project; (g) THAT the above action be communicated to the Council of the Municipality of Metropolitan Toronto; (h) THAT the Staff be instructed to prepare a report outlining the reasons for the above recommendations; Carried Unanimously. SCHEME W.C. -3$ -- CHANNEL IMPROVEMENTS ETOBICOKE RIVER, TOWN OF BRAT PTON: ( C -7 The Staff presented a Report covering the Engineering Study made in the Town of Brampton by James F. MacLaren Associates and on negotiations which had been under way with the Town of Brampton. Res. ,$ Moved By:- C. H. Hiscott Seconded By:- V. Vignale THE BOARD RECOMMENDS THAT:- (a) recommendations Nogs. 2, 3 and 4 of the MacLaren Report be adopted as Scheme W.C. -3$ of the Authority, and further in this connection that the following action be taken: (i) THAT the Town of Brampton be designated as the Benefitting Municipality; (ii) THAT the Minister of Lands and Forests be requested to approve of the Scheme and a Grant of 50% of the cost thereof; (iii)THAT a copy of the Scheme be forwarded to the Town of Branpton and tht no .action be taken on the Scheme until such time as it is accepted and approved by the said Municipality; (iv) THAT when approved by the Minister of Lands and Forests and the Town of Brampton, that application be made to the Ontario Municipal Board for their approval, if required; (v) THAT when approved, the appropriate Authority officials be authorized and directed to take what- ever action is required in connection with the Scheme including the execution of any necessary Agreements; (b) THAT the Minister of Lands and Forests be requested to approve a Grant of 50% of the cost of the Extension of the Mains Creek Tunnel from its present outlet to a new outlet into the Etobicoke Creek immediately upstream from the original sewage treatment plant. C -$ -4- (c) THAT the acquisition of Flood Plain Lands within the Town of Brampton be considered part of the Authority's Plan for Flood Control and Water Conservation. Carried Unanimously. Following luncheon, the Board recessed to carry out a field inspection of the Massey Creek Area. ADJOURNMENT: On Motion, the Meeting adjourned at 2:00 p.m. R. G. Henderson F. L. Lunn Chairman Secretary - Treasurer C -9 SCHEDULE °'Ad' FLOOD CONTROL & WATER CONSERVATION - PROGRESS REPORT August 14th, 1962 BLACK CREEK CHANNEL: Scarlett Road to Rockcliffe Boulevard - - -• construction is approximately 45,L complete; Rustic Road to Wilson :,venue -- tenders have been received for this phase and construction will commence as soon as the approval of the Province has been received; Remaining sections - -- final design is nearing completion° preliminary property plan nearly complete; YORK MILLS CHANNEL: Preliminary Engineering complete; WOODBRIDGE CHANNEL: Construction 60% complete; DON WATERSHED: Preliminary Engineering study for Reservoir on the Don Watershed is practically complete; HUMBER WATERSHED: Preliminary Engineering for Reservoirs on Main and East Branches of the Humber is proceeding; CLAIREVILLE RESERVOIR: Design Engineering is in progress. Specifications will be ready for tender this Fall for the Indian Line Road Diversion and for the Control Gates of the Dam; OTHER ENGINEERING STUDIES in various stases of completion include: EBENEZER RESERVOIR -- Humber MILNE RESERVOIR -- Rouge SNELGROVE -- Etobicoke W.C.-34 -- CHANNEL II'TPROVEIrENTS: Scheme to be completed this Fall under Winter Works Programme; MI IIC0 CREEK ENGINEERING STUDY: Field work is in progress ;. Report is scheduled for completion by December. Vetropo/tan aronto and legion Coseructtion �uthoritr� MINUTES C-10 Flood Control & Water Conservation Advisory Board Dec. 6/62 0/62 The Flood Control and Water Conservation Advisory Board met in the Board Room, 17 Mill Street, on Thursday, December 6th, 1962, commencing at 2:00 p.m, PRESENT WERE: Chairman R. G. Henderson Authority Vice - Chairm.W. C. Davidson Members H. M. Griggs C. H. Hiscott R. E. Jones A. Macdonald F. J. McKechnie A. E. Reeve J. S. Scott V. Vignale Representatives of H. G. Acres Limited Representatives of James F. MacLaren Limited Secretary - Treasurer F. L. Lunn Dir. of Operations K. G. Higgs Asst. Dir. of Operat. E. F. Sutter MINUTES: The Minutes of Meeting No. 2/62 were presented. Res. #9 Moved By:- C. H. Hiscott Seconded By:- J. S. Scott RESOLVED THAT- the PMIinutes of Meeting No. 2/62 as presented, be adopted. Carried Unanimously. STAFF PROGRESS REPORT: Res. 410 Moved By:- V. Vignale Seconded By:- C. H. Hiscott RESOLVED THAT:- the Staff Progress Report dated December 6th, 1962, be received and appended as Schedule of these Minutes. Carried Unanimously. NOTICE TO PROPERTY OWNERS: Res. 7'111 Moved By:- J. S. Scott Seconded By:- R. E. Jones THE BOARD RECOMMENDS THAT: - property owners having property which is being entered upon for survey or other purposes of the Authority be notified by written notice by the Staff of the Authority prior to said entry; Carried Unanimously. PROJECT F -13 -B - DON WATERSHED - PRELIMINARY ENGINEERING STUDY: Representatives of H. G. Acres Limited presented a Preliminary Engineering Report of the Don Watershed. C -11 - 2 - Res. #12 Moved By:- F. McKechnie Seconded By :- C. H. Hiscott THE BOARD RECOMMENDS THAT : - the report of H. G. Acres Limited "A Study of the Don River Watershed" be approved as presented, and further in this connection, that the following action be taken: (a) That copies of this report be forwarded to the Conservation Authorities Branch of the Department of Lands and Forests for approval; (b) That the Authority undertake the construction ofWillowdale and Finch Reservoirs, as recommended in the said report, under the Plan for Flood Control and Water Conservation; (c) That the Staff be authorized and instructed to proceed as quickly as possible with the acquisition of the necessary lands for the Willowdale and Finch Reservoirs under the provisions of the Conservation Authorities Act; Carried Unanimously. BAYVIEW ESTATES RATEPAYERS ASSOCIATION -- WILLOWDALE RESERVOIR: Res. #13 Moved By :- J. S. Scott Seconded By :- W. C. Davidson THE BOARD RECOMMENDS THAT : - a copy of the Don Watershed report be made available to the Bayview Ratepayers Association; Carried Unanimously. PROJECT F.14 - HUMBER WATERSHED - INTERIM REPORT ON HYDROLOGY: Representatives of James F. MacLaren Limited presented an interim report on the Hydrology of the Humber River, Main and East branches. Res. #14 Moved By :- V. Vignale Seconded By :- A. Macdonald THE BOARD RECCMI.IENDS THAT : - the interim report on the hydrology of the Main and East Branches of the Humber River as prepared by James F. MacLaren Limited be approved as presented; and further; that the following action be taken in this regard: (a) That this report be forwarded to the Conservation Authorities Branch of the Department of Lands and Forests, for approval; (b) That James F. MacLaren Limited be authorized to complete their Preliminary Engineering Report on the basis of their conclusions reached in the interim report. Carried Unanimously. 1963 CAPITAL WORKS PROGRAMME ESTIMATES AND PROJECT PLANNING: The Staff presented a proposed Capital works Programme Estimatesand Project Planning. Res. #15 Moved By:- A. Macdonald Seconded By :- R. E. Jones THE BOARD RECO- ,PCENDS THAT: - the 1963 Capital Works Prcgrarnme Estimates and Project Planning be adopted and appended as Schedule "3" of these Minutes. Carried Unanimously. C -12 - 3 - 1963 PRELIMINARY BUDGET -- GENERAL WATER CONTROL SCHEMES: The proposed 1963 Budget for general Water Control Schemes was discussed at some length. Res. #16 Moved By :- A. Macdonald Seconded By :- Vignale THE BOARD RECOMMENDS THAT:- the Preliminary 1963 Budget for General Water Control Schemes be approved as follows: Stream Surveys Massey Creek Engineering Study Extension of Flood Warning System Communication System Study Etobicoke River Engineering St. Highland Creek Engineering Study Carried Un PROJECT F -11 -- WOODBRIDGE CHANNELIZATION: communication was presented advising that the Channel is now virtually complete. Moved By :- W. C. Davidson Seconded By :- F. McKechnie A Staff Control Res. 117 2,500.00 10,000.00 10,000.00 10,000.00 10,000.00 10 , 000.00 52,500.00 Woodbridge Flood THE BOARD RECOMMENDS THAT: - the Staff be authorized to arrange for a suitable opening ceremony for the Woodbridge Flood Control Channel in the Spring of 1963 in colunction with the Village of Woodbridge and the Toronto and York Roads Commission; Carried Unanimously. ETOBICOKE RIVER -- PROPOSED ENGINEERING STUDY: A Staff communication was presented requesting that consideration be given to undertaking a Scheme for bank stabilization on the Etobicoke River between the Queen Elizabeth Highway and the C.N.R. right -of -way and suggested that the preliminary engineering be undertaken in 1963. Res. #18 Moved By:- A. Macdonald Seconded By:- H. M. Griggs THE BOARD RECOMMENDS THAT:- the Staff be authorized to obtain a proposal from M. M Dillon & Company Limited; consulting engineers, , for the undertaking of a preliminary engineering study of erosion control and bank stabilization measures required on the Etobicoke River between the Queen Elizabeth Highway and the C.N.R. right -of -way; Carried Unanimously. SCHEME W.C.-37-:- EXTENSION OF THE FLOOD WARNING SYSTEM: A Staff report was presented outlining the work proposed to be undertaken daring 1963 for the further extension of the Flood Warning System. Res. #19 Moved By:- C. 11. Hiscott Seconded By :- V. Vignale THE BOARD RECOMMENDS THAT:- Scheme W.C.-37 -- SPA Scheme for the Extension of the Flood Warning Systemi7 be adopted; and further in this connection, that the following accion be taken: - 4 - (a) That all munk ipalities be designated as benefitting; (b) That the Minister of Lands and Forests be requested to approve of the Scheme and a grant of 50% of the cost thereof; (c) That the Department of Lands and Forests, Conservation •authorities Branch, be requested to design a Recording Stream Gauge for each of the following locations: 1. (i) Main Branch of the Humber River - Albion Hills; (ii) East Branch of the Rouge River; (iii) ''lest Branch of the Humber River at Kipling Ave., 2. a Recording Rain Gauge on the site of the proposed Milne Dame and Reservoir; (d) That following the approval of the Scheme by the Minister of Lands and Forests, the Staff, in co- operation with the Department of Northern Affairs and National Resources, be authorized to construct the Stream Gauges and a Rain Gauge to the extent of the Budget allotted for this purpose during 1963. Carried Unanimously. COMMUNICATIONS SYSTEM -- PROPOSED STUDY: A Staff communication was presented recommending that a complete study of a proposed Communications Network and Supervisory Control System for the operation of the Flood Forecasting System together with the Dams and Reservoirs to be constructed under the Plan for Flood Control and Water Conservation. Res. #20 Moved By:- W. C. Davidson Seconded By :- A. Macdonald THE BOARD RECOMMENDS THAT:- a proposal be obtained from James F. MacLaren Limited, consulting engineers, for a study of a Communications Network and Supervisory Control System for the operation of the Flood Forecasting System together with Dams and Reservoirs to be constructed under the Plan for Flood Control. Carried. ADJOURNMENT: On Motion, the Meeting adjourned at 5:10 p.m. R. G. Henderson F. L. Lunn Chairman Secretary- Treasurer SCT l?'i7 �E_ ^' LOOD CQNTROL & WAT.Lik CONS .bKVhTIOW hDVI:ORY BOAR) Staff Progress Report December 6, 1962 FLOOD CdNTROL PL,,N Black Creek Shannel - Scarlett Road to Rockcliffe Blvd: - Construction of this phase is now about 90, complete Black Creek Channel - Rustic Road to ',Jilson Avenue.: - Qontract has r,een awarded and work has commenced - Construction is 15% complete Black Creek Channel - Rockcliffe Blvd. to Louvain Street: - Final design and preparation of contract documents in progress for this section which is proposed for con- struction in 1963. •t Woodbridge Channel: - Construction phase of this project is now virtually complete except for some.minor cleaning up - Approval is now been given for the necessary seeding and •soddi'ng which will be carried out in the spring of 1963. - Fencing of property boundaries will be carried out as a winter works project by authority staff. Don Watershed: - The preliminary engineering study for reservoirs on the Don Watershed has been completed Humber Watershed: - The preliminary engineering study for reservoirs on the Main and East branches of the Humber River is nearing completion. - An Interim Report on Hydrology has been prepared. Clairville Reservoir: C -14. - Contract documents for the control gates have been completed and submitted to the Province for approval prior to calling for tenders. - Contract documents for the dam and the diversion of the Indian Line will be complete before the end of the year. Snelgrove Reservoir: - Preliminary engineering report is now complete in draft form. Flood Plain Lands: - Substantial acreages of flood plain lands have been acquired. However, exact figures will not be available until the Property Division has completed its progress report. (OVER) C -15 - 2 - FLOOD CONTROL SCH&',ES & STUDIES Mimico Creek Engineering Study: - This study is now practically completed Scheme WC-34 - Channel Improvements on Highland Creek: Jork has bean resumed on this scheme as a winter works project. Extension of Flood :+arning System: - The 1962 programme for the extension of the flood warning system has been completed. Massey Creek Channel Improvements: - The proposed engineering study of the Massey Creek Channel Improvements is awaiting the approval of the Provincial Government. - The staff are preparing a scheme for implementing these channel improvements as a winter works project. E. F. Sutter, s►ssistant Director of Operations. EFS /js Nov.30 /62 SCHEDULE s ►B s► METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY .FLOOD CONTROL AND WATER CONSERVATION CAPITAL WORKS PROGRAMME 1963 ESTIMATES SECTION .1: PLAN FOR FLOOD CONTROL AND WATER CONSERVATION 1963 PROJECT PLANNING ITEM (a) All Municipalities Benefitting SCHEDULE "A �► Reservoir Land $ 1,240,000. Engineering F -1 Claireville Reservoir $00,000. F -11 Woodbridge Channelizat. 30,000. F -12 York Mills SCHEDULES "C v/ & ”Du Acquisition of Flood Plain • & Small Reservoir Sites 671,000. (b) Metropolitan Toronto Bene- fitting B -1 Scarlett Rd. to Rock - cliffe B -2 Rustic Rd. to Wilson B -3 GRAND TOTAL: C -16 TOTAL $ 2,070,000. 671,000. 115,242. 1,029,546. $91,960. 2,036,74$. $ 4,777,74$. Government of Canaria. Province of Onta-^-L o Authority (All Municip alities 370 376 25 % Benefit) SCHEDULE t"k" LARGE DAMS AND RESERVOIRS PROJECT 1962 1963 1964 Reservoir Land 1,240,000. 1,170,000. Claireville 559,602.57 800,000. 900,000. Ebenezer Bolton Nashville King Creek 54,163.14 224,145.93 43.14 20,171.09 Lower East Branch 170,$99.$5 Finch Willowdale Woodbridge York Mills P.E. Don P.F. Humber 88,944.86 178,769.35 657,187.06 30,000. 22, 093.75 51,479.13 67,350.05 1965 1966 1967 1968 1969 1970 TOTALS NOTE: 2,096,849.92 2,070,000. 2,070,000.2,070,000 2,070,000. 2,070,000.2,070,000. 2,400,000.2,400,000. This Schedule is based on the necessity of devoting a large portion of Reservcir Sites. The only construction project scheduled is the impossible at this time to schedule other works and it could appear projects might have to be delayed until about 1966 or 1967. of available funds for the acquisition Claireville Dam and Reservoir. It is that further construction on any PROJECT SCHEDULE i,Bc' BLACK CREEK Government of Canada 371% Province of Ontario 371% Metropolitan Toronto 25 % (Benefitting municipality 1962 1063 1964 1965 _1966_ , 1967 _ 1968 1969 1970 B -1 Scarlett Rd. to Rockcliffe 35$,252. 115,242. B -2 Rustic Rd. to Wilson B -3 1,029,546. $91,960. TOTAL ' 358,252. 2,036,748. 330,000. 330,000. 330,000. 330,000. 330,000. 330,000. 330,000. NOTES: On the basis of the Municipal Levy, a total of $2,395,000. can be expended on the Black Creek during 1961, 1962, and 1963. At the present time committed expenditures amount to $1,503,040. The next phase of the Black Creek can therefore involve an expenditure of $891,960. including the acquisition of lands not.presently committed, engineering and construction. PROJECT SLririUL1 "U" rrovince oz untiario >vyo Authority 50% c SMALL DAMS AND RESERVOIRS (all municipalities N benefitting) `O 1 62 1963 1964 1965 1966 1967 1968 1969 197) P -1 Snelgrove 115,461.82 P -2 Milne 52,648.68 P -3 Percy 264.60 P -13 Engineering Study Duffin 20,999,23 TOTAL 189,374.33 SCHEDULE "D" FLOOD PLAIN LAND PROJECT 1962 1963 1964 1965 1966 1967 1968 1969 1970 Etobicoke 1,318.90 Mimico 94.97 _ _ Humber 936,857.04 Don 130,557.07 Highland 4,713.75 Rouge 342,974.37 Duffin 128, 298.09 TOTAL 1,544,814.19 TOTAL "C' & "D" 1,734,188.52 671,000. 671,000. 671,000. _ 671,000. 671,000. 671,000. 506,000. 506,000. .NOTE: Considerably_ mare. Flood_.P1ain.Land has been. acquired in ,1962 using funds collected_ for 1961 and 1962. Committments have also been made for a considerable portion of monies available for 1963. It is proposed to acquire Reservoir Sites and Flood Plain Land to the extent of the monies available, and construction of projects is not scheduled. With the available funds, it would app°ar that construction cannot star. until 1967 or 1968. Metropolitan, aron,to anal legion Con4,?ruation, GGtYLONGt "ik H U ES C -20 Flood Control & Water Co.o.servat; on Ad t ory Board Jan. 24/63 #4/62 The Flood Control and Water Conservation Advisory Board met in the Board Room, 17 M__11 Strc.;t, on Thursday, January 24th, 1963, commencing at 2 :00 p.m. PRESENT WERE: Authority Chairman Advisory Board Chairman Vice - Chairman Members 3.:crotary- Treasurer Asst. Dire ;tor of Operat. R. K. Kilborn & Assoc. Dr. G. Ross Lord R. G. Henderson W. W. H. R. A. F. A. J. V. K. F. E. W. J. H. ggart C. Davidson M. Griggs E. Jones Macdonald McKechnie E. Reeve S. Scott Vignale G. Waters L. Lunn F. Sutter A. Scott � I iU'i'ES: 'ire Minuted of Meeti .14; No- 3/62 we-s3 pa eent:;c% Res. #21 Moved By:- K. (- Waters Seconder! By- a_ C. Davidson RESOD E2 J 11 ':ri . • i iie ill Thutc: ] of i i:.:.ti ig Fc. 3/62 as preooli ,eth iptcd, linoni mously. PROJECT P -•13 •••- STUOI - - -- DUFFIN CREEK BASIN: !Ir. Scott of R. Kilborn & 1s,- ocintec --)resented a report of the °rolimi n &ry Engineering Stud/ of the Duffin Creek Watershed. The report was considered in detail. es, J22 Moved L'y: - A. E. Reeve Seconded By:- J. S. Scott THE BOARD RECOMMENDS THAT:- the report for Flood Control and Water Conservation on the Duffin Creek Watershed, as prepared by R. K. Kilborn & Associates, be approved as presented, and further in this c'onaection that the following action be taken: That copies of the Report be forwarded to the Conservation Authorities Branch, Ontario Department of Lands and Forests, for approval; That the revised Arthur Percy Dam, as recommended in the iLeport, be constructed under the Plan or' F1 ood Control and Water Conservation; That th3 Authority confirm its policy of the ccqui m..ticn of the :Lcr::ei Duf'f:in Flood Plain Lands; Th; t',13 Gr; cr. Rifer Dan a:'d Resorvoir be abandoned; C -21 - 2 - '(e) That the construction of Dykes and the construction • of the Clarkes Hollow Dam and Reservoir be deferred; Carried Unanimously. PERMANENT SIGNS -- FLOOD CONTROL PROJECTS: The matter of designing and erecting permanent signs for the completed Flood Control Projects was discussed at some length. Res. #23 Moved By:- W. J. Haggart Seconded By :- R. E. Jones THE BORD RECOMMENDS THAT:- the Staff be directed to have designed suitable permanent signs for Projects completed under the Plan for Flood Control and Water Conservation. Carried Unanimously. PROPOSED DAM -- ROUGE RIVER AT FINCH AVENUE: A Staff communication was presented advising that a recommendation had been referred from the R.D.H.P. Advisory Board in connection with studying the feasibility of the construction of a Dam on the Rouge River in the vicinity of Finch Avenue and Sewell's Road, which might include a combined crossing for Finch Avenue. The matter was discussed at some length. Res. #24 Moved By: - K. G. Waters Seconded By :, A. E. Reeve THE BOARD RECOMMENDS THAT:- the Staff be authorized and directed to obtain a proposal from R. K. Kilborn & Associates, Consulting Engineers, to undertake a Preliminary Engineering Study to determine the feasibility cf combining a Dam and major Bridges on the Rouge River in the vicinity of Finch Avenue and 'Sewell's Road; and further in this regard -•- that the Minister of Lands and Forests be requested to approve a grant of 750 of t- cost of this Preliminary Engineering Study; Carried Unanimously. FLOOD WARNING SYSTEM -- PROPOSED AERIAL PATROL: A Staff report was lresented suggesting that consideration be given to establishing an aerial patrol of the river valleys under the jurisdiction of the Authority. Res. #25 Moved By:- Dr. G. Ross Lord .Seconded By:- W. J. Haggart THE BOARD RECOMMENDS THAT:- an aerial patrol be established in conjunction with the Municipality of Metropolitan Toronto on a trial basis, and further in this connection, that the following action be taken': (a) That the MMIunicipality of Metropolitan Toronto be requested to participate in the proposed programme of aerial inspection of the river valleys and to assume 50% of the cost thereof; (b) That when the approval of the Municipality of Metropolitan Toronto has been received, that the Staff be requested to enter into an Agreement with Dominion Helicopt,rs Limited for periodic inspections of the river valleys on a 1 -year trial basis in accordance with the terms outlined in their proposal dated November 16th, 1962; Car]•ied Unanimously. C -22 - 3 - PROJECT F -12 -- YORK MILLS CHANNEL IMPROVEMENTS: A Staff communication was presented advising that it was necessary to ccnstruct the Flood Control Channel at York Mills in conjunction with the construction of a trunk sewer by the Municipality of Metropolitan Toronto and suggesting that final azgineering be proceeded with immediat ly. Res. #26 Moved By:- K. G. Waters Seconded By:- H. M. Griggs THE BOARD RECOMMENDS THAT:- the Staff be authorized and directed to instruct the firm of W. 0. Chisholm Associates, Consulting Engineers, to proceed immediately with the final design and the contract documents for the York Mills project -- Project F -12 -- between Donino Avenue and the Rosedale Golf Club; Carried Unanimously. PROJECT F -1 -- CLAIREVILLE DAM & RESERVOIR -- SOD- TURNING CEREMONIES: Res. #27 Moved By:- F. McKechnie Seconded By:- V. Vignale THE BOARD RECOMMENDS THAT:- the Information and Education Advisory Board be requested to arrange a suitable Sod - Turning Ceremony to mark the coenceme-it of the Claireville Dam and Reservoir; Carried Unanimously. PROJECT F -11 - WOODBRIDGE FLOOD CONTROL CHANNEL -- FLOOD PLAIN LANDS - MASTER PLAN OF DEVELOPMENT: The Master Plan for the development of the Woodbridge Flood Plain Lands acquired in connection with Project F -11 was referred to the Board for their consideration. Res. #2$ Moved By:- R. E. Jones Seconded By:- A. Macdonald THE BOARD RECOMMENDS THAT:- the recommendations in connection with the Woodbridge Flood Blain Lands as recommended by the Conservation Areas Advisory Board be approved; Carried Unanimously. ETOBICOKE RIVER AT DUNDAS STREET: Mr. McKechnie advised that the use of land in the vicinity of the Etobicoke River and Dundas Street was being studied by the Township of Toronto and in this connection certain problems had been encountered. Res. y; #29 Moved By:- F. McKechnie Seconded By:- V. Vignale RESOLVED THAT:- the Staff be authorized and directed to obtain a proposal for an engineering study of Flood Control for the Etobicoke River in the vicinity of Dundas Street• and to further prepare a report on the status of the Etobicoke aims located on the East side of the Etobicoke River South of Dundas Street; AND BE IT FURTHER RESOLVED THAT:- a report on the filling and dumping carried out in the vicinity of the area known as Markland Woods on the East bank of the Etobicoke River North of Dundas Street, be made available; Carried Unanimously. On Motion, the Meeting adjourned at 4:30 p.in. R. G. Henderson F. L. Lunn Chairman Secretary- Treasurer