MINUTES
c -1
Flood Control & Water Conservation Advisory Board
Meeting 1/62
The Flood Control and Water Conservation Advisory Board met in the
Board Room, 17 Mill Street, commencing at 12:00 noon, on Tuesday,
June 19th, 1962.
PRESENT WERE:
Authority Chairman
Advisory Board Chairman
Advisory Board Vice Chr.
Members
Dept. of Lands & Forests
Dept. of Lands & Forests
Director of Operations
Asst. Dir. of Operations
Secretary- Treasurer
Dr. G. Ross Lord
R. G. Henderson
W. J. Haggart
H. M. Griggs
C. H. Hiscott
.R. E. Jones
F. Kline
A. Macdonald
A. E. Reeve
J. S. Scott
A. S. L. Barnes
J. W. Murray
K. G. Higgs
E. F. Sutter
F. L. Lunn
MINUTES:
The Minutes of Meeting Nb. 3/61 were presented.
Res. j1 Moved By:- W. J. Haggart
Seconded By:- C. F. Kline
RESOLVED THAT:- the Minutes ofMeeting No. 3/61 as
presented, be adopted.
Carried Unanimously.
STAFF PROGRESS REPORT:
Mr. Sutter presented the Staff Progress Report for the period of
January 1st, 1962 to June 15th, 1962.
Res. #2 Moved By:- C. H. Hiscott
Seconded By:- R. E. Jones
RESOLVED THAT:- the Staff Progress Repo rt for the
period of January 1st to June 15th, 1962, be received,
and appended as Schedule SQAf' of these Minutes.
Carried Unanimously.
MEETING NO. 2/62:
It was agreed that the Board would meet for an all -day Meeting,
commencing at 10:00 a.m. on Tuesday, August 14th, 1962, to receive
the Engineering Report on the Duffin's Creek Watershed and the York
Mills Channel of the Don River, and to carry out a Field Inspection
of the two projects.
STAFF REPORT:
Res. #3 Moved By:- A. E. Reeve
Seconded By:- C. H. Hiscott
RESOLVED THAT:- the Staff prepare, and submit to
C -2
-2 -
the Board every two months a Progress Report on
projects of interest to the Board.
Not Carried.
FIELD INSPECTION:
The Meeting adjourned at 1:15 p,.m. to partake of a Field Inspection
of the following projects presently in progress:
(a) Lower Highland Creek
(b) Lower Humber River
(c) Black Creek
(d) Woodbridge Channelization
R. G. Henderson F. L. Lunn
Chairman Secretary- Treasurer
SCHEDULE i?A'? C -3
FLOOD CONTROL & WATER CONSERVATION
PROGRESS REPORT -- Januar 1st to June 1 th 1 6
BLACK CREEK CHANNEL Scarlett Road to Rockcliffe Blvd):
- construction is approximately 30% complete;
BLACK CREEK CHANNEL Rustic Road to Wilson Avenue:
- plans and specifications for this section are now
complete and awating the approval of the Federal Government;
- property surveys are proceeding;
BLACK CREEK CHANNEL (Remaining Sections):
-final design is now in progress;
-staff are preparing a preliminary property plan;
YORK MILLS CHANNEL:
- preliminary engineering is now complete in draft form;
WOODBRIDGE CHANNEL:
- construction is 25% complete;
DON WATERSHED:
- preliminary engineering study for Reservoirs on the
Don Watershed proceeding -- will be complete in approximately
five weeks;
HUMBER WATERSHED:
- preliminary engineering study of Reservoir Sites on
Main and East Branches of the Humber is underway;
CLAIREVILLE RESERVOIR:
- design engineering is in progress;
- property acquisition is proceeding;
- negotiations proceeding with Etobicoke Twp. and C.N.R.
for diversion of Indian Line;
EBENEZER RESERVOIR:
- preliminary engineering study is nearly complete;
DUFFIN CREEK WATERSHED:
- preliminary engineering study of Reservoir Sites on
Duffin Creek is complete in draft form;
MILNE RESERVOIR:
=engineering study for design of dam is now in progress;
- property negotiations are proceeding;
SNELGROVE RESERVOIR:
- preliminary property plan for Snelgrove Reservoir has been
approved by the Province;
- surveys and property negotiations are in progress;
- engineering study for the Dam has commenced;
FLOOD PLAIN AND VALLEY L..NDS:
Eglinton Flats -- acquisition of lands is proceeding;
Lower Rouge Valley -- property surveys and negotiations proceeding;
C -4
Lower Duffin -- acquisition of lands under active negotiation;
Don Valley (formerly W.C.14) -- acquisition now nearly complete;
Highland Creek (formerly W.C.23) -- property negotiations just
commencing;
Duffin Creek -- Riverside Drive Area -- Staff are preparing a preliminary
property plan;
MIMICO CREEK ENGINEERING STUDY:
- study has been approved by the Province and will commence
immediately;
STOUFFVILLE STUDY:
- Province has approved engineering study for new culvert
structure at Main Street;
- preliminary property plan of flood plain lands is
nearly complete;
W.C. -34 -- CHANNEL IMPROVEMENTS:
- Highland Creek portion 70% complete;
- Humber River portion complete;
- work suspended until Fall;
11.11.7.25 -- EXTENSION TO FLOOD WARNING SYSTEM:
- Sdeme has now been approved by the Province;
FLOOD CONTROL PLAN -- SUMNhRY OF LAND ACQUISITION TO DATE:
Claireville Reservoir -- 293 acres
Ebenezer Reservoir -- 19 acres
Bolton Reservoir -- 237 acres
Willowdale Reservoir -- 13 acres
Finch Reservoir -- 40 acres
Milne Reservoir -- 1$4 acres
Snelgrove Reservoir -- 90 acres
Woodbridge Channel -- 60 acres
Black Creek Channel -- 20 acres
Etobicoke Flood Plain Lands -- nil
Mimico Creek Flood Plain Lands -- 4 acres
Humber Flood Plain Lands -- 130 acres
Don Flood Plain Lands -- 230 acres
Highland Creek Flood Plain Lands -- Nil
Rouge Flood Plain Lands -- 2 acres
Duffin Flood Plain Lands -- 105 acres
Total Acreage -- 1,467 acres
Vetropo/ttaFi Joronto and kejon
Con$eruation ...Attihori %y
MIle1UTES
C -5
Flood Control & Water Conservation Advisozy Board Meeting No. 2/62
The Flood Control and Water Conservation Advisory Board met in the
Board Room, 17 Mill Street, commencing at 10:00 a.m. on Tuesday,
August 14th, 1962.
PRESENT WERE:
Authority Chairman
Advisory Board Chairman
Vice Chairman
Members
Secretary- Treasurer
Director of Operations
Asst. Dir. of Operations
Lands & Forests
W. 0. Chisholm Associates
Dr. G. Ross Lord
R. G. Henderson
W. J. Haggart
W. C. Davidson
C. H. Hiscott
R. E. Jones
C. F. Kline
A. MacDonald
F. McKechnie
A. E. Reeve
J. S. Scott
V. Vignale
F. L. Lunn
K. G. Higgs
E. F. Sutter
F. Forbes
W. 0. Chisholm
MINUTES:
The Minutes of Meeting No. 1/62 were presented.
Res. #4 Moved By:- C. H. Hiscott
Seconded By:- W. J. Haggart
RESOLVED THAT:- the Minutes of Meeting No. 1/62 as
presented, be adopted.
Carried Unanimously.
STAFF PROGRESS REPORT:
The Staff Progress Report was presented by the Director of Operations.
Res. #5
Moved By:- F. McKechnie
Seconded By:- V. Vignale
RESOLVED THAT:- the Staff Progress Report be received
and appended as Schedule "An of these Minutes.
Carried Unanimously.
PROJECT F.12 -- YORK MILLS FLOOD CONTROL CHANNEL:
Mr. W. 0. Chisholm presented a report on the York Mills Flood Control
Channel.
Res. #6
Moved By:- C. F. Kline
Seconded By:- R. E. Jones
THE BOARD RECOMMENDS THAT:- (a) the Preliminary
Engineering Report for the York Mills Channel Improvements
-- Donino Avenue to the Rosedale Golf Club -- as
prepared by W. 0. Chisholm Associates be approved
as presented;
0 -6
- 2 -
(b) THAT the report be submitted to the Conservation
Authorities Branch of the Department of Lands and
Forests for approval;
(c) THAT the Staff be authorized and instructed to
proceed with negotiations for the acquisition•of the
necessary lands for this project for a nominal sum;
(d) THAT a meeting of all property owners affected be
called to present the plan;
(e) THAT until the negotiations referred to in recommendation
(c) have been satisfactorily completed, no further steps
be taken to implement the recommendations contained in the
Chisholm report.
Carried Unanimously.
SCHEME W.C. -36 -- PMASSEY CREEK CHANNEL IMPROVEMENTS:
The Director of Operations presented a report dealing with the proposed
Scheme.
Res. 77-7 Moved By:- J. S. Scott
Seconded By :- A. MacDonald
THE BOARD •. C =DS THtt :- (a) the Authority assume
responsibility for Flood Control and Channel Improvements
for the Massey Creek from the confluence of the Massey
Creek with the Main Branch of the Don River to the South
side of St. Clair Avenue East, immediately West of
Warden Avenue;
(b) THAT the Channel Improvements proposed for this
section of the Massey Creek by R. V. Anderson & Associates
be not approved;
(c) THAT Channel Improvements in this section of the
Massey Creek be designed in such a way that the natural
conditions of the stream will be retained;
THAT the flood plain of the valley lands shall
be used for flood storage;
THAT where necessary the stream will be straightened
and eroded cut banks will be protected by use of gabions,
and where necessary gabion drop structures will be constructed;
(d) THAT the Staff be authorized to obtain a proposal
from R. V. Anderson & Associates for the final design
of Channel Improvements to be constructed on the Massey
Creek in accordance with recommendation (c);
(e) THAT the Authority undertake improvements to the
Massey Creek;progressively over a number of years as
funds are made available, and that these works be
constructed under the Winter Works Incentive Programme;
(f) THAT the Authority adopt Scheme W.C. -36, 'oA Scheme
for the Improvement of the Channel of the Massey Creek•',
and further in this connection, that the following
action be taken:
(i) THi,T the Municipality of Metropolitan Toronto
be designated as the Benefitting Municipality;
(ii) THAT the Minister of Lands and Forests be
requested to approve of the Scheme and a
Grant of 50% of the cost thereof;
- 3 -
(iii) THAT a copy of the Scheme be forwarded to
the Municipality of Metropolitan Toronto and
that no action be taken on the Scheme until
such time as it is accepted and approved by
the said Municipality;
iv) THAT when approved, the appropriate Authority
officials be authorized and directed to take
whatever action is required in connection
with the Scheme, including the execution
of any necessary documents;
(v) THAT the works included in Scheme W.C. -36 be
submitted to the Provincial and Dominion
Governments requesting approval of the works
contained in the Scheme as a Winter Works
project;
(g) THAT the above action be communicated to the Council
of the Municipality of Metropolitan Toronto;
(h) THAT the Staff be instructed to prepare a report
outlining the reasons for the above recommendations;
Carried Unanimously.
SCHEME W.C. -3$ -- CHANNEL IMPROVEMENTS ETOBICOKE RIVER, TOWN OF
BRAT PTON:
(
C -7
The Staff presented a Report covering the Engineering Study made
in the Town of Brampton by James F. MacLaren Associates and on
negotiations which had been under way with the Town of Brampton.
Res. ,$ Moved By:- C. H. Hiscott
Seconded By:- V. Vignale
THE BOARD RECOMMENDS THAT:- (a) recommendations Nogs.
2, 3 and 4 of the MacLaren Report be adopted as Scheme
W.C. -3$ of the Authority, and further in this connection
that the following action be taken:
(i) THAT the Town of Brampton be designated as the
Benefitting Municipality;
(ii) THAT the Minister of Lands and Forests be requested
to approve of the Scheme and a Grant of 50% of the
cost thereof;
(iii)THAT a copy of the Scheme be forwarded to the Town
of Branpton and tht no .action be taken on the
Scheme until such time as it is accepted and approved
by the said Municipality;
(iv) THAT when approved by the Minister of Lands and
Forests and the Town of Brampton, that application
be made to the Ontario Municipal Board for their
approval, if required;
(v) THAT when approved, the appropriate Authority
officials be authorized and directed to take what-
ever action is required in connection with the
Scheme including the execution of any necessary
Agreements;
(b) THAT the Minister of Lands and Forests be requested to
approve a Grant of 50% of the cost of the Extension of
the Mains Creek Tunnel from its present outlet to a new
outlet into the Etobicoke Creek immediately upstream
from the original sewage treatment plant.
C -$
-4-
(c) THAT the acquisition of Flood Plain Lands within
the Town of Brampton be considered part of the Authority's
Plan for Flood Control and Water Conservation.
Carried Unanimously.
Following luncheon, the Board recessed to carry out a field
inspection of the Massey Creek Area.
ADJOURNMENT:
On Motion, the Meeting adjourned at 2:00 p.m.
R. G. Henderson F. L. Lunn
Chairman Secretary - Treasurer
C -9
SCHEDULE °'Ad'
FLOOD CONTROL & WATER CONSERVATION - PROGRESS REPORT
August 14th, 1962
BLACK CREEK CHANNEL:
Scarlett Road to Rockcliffe Boulevard - - -• construction is
approximately 45,L complete;
Rustic Road to Wilson :,venue -- tenders have been received for
this phase and construction will commence as soon as the approval
of the Province has been received;
Remaining sections - -- final design is nearing completion°
preliminary property plan nearly complete;
YORK MILLS CHANNEL:
Preliminary Engineering complete;
WOODBRIDGE CHANNEL:
Construction 60% complete;
DON WATERSHED:
Preliminary Engineering study for Reservoir on the Don Watershed
is practically complete;
HUMBER WATERSHED:
Preliminary Engineering for Reservoirs on Main and East Branches
of the Humber is proceeding;
CLAIREVILLE RESERVOIR:
Design Engineering is in progress. Specifications will be ready
for tender this Fall for the Indian Line Road Diversion and for
the Control Gates of the Dam;
OTHER ENGINEERING STUDIES in various stases of completion include:
EBENEZER RESERVOIR -- Humber
MILNE RESERVOIR -- Rouge
SNELGROVE -- Etobicoke
W.C.-34 -- CHANNEL II'TPROVEIrENTS:
Scheme to be completed this Fall under Winter Works Programme;
MI IIC0 CREEK ENGINEERING STUDY:
Field work is in progress ;.
Report is scheduled for completion by December.
Vetropo/tan aronto and legion
Coseructtion �uthoritr�
MINUTES
C-10
Flood Control & Water Conservation Advisory Board Dec. 6/62 0/62
The Flood Control and Water Conservation Advisory Board met in the
Board Room, 17 Mill Street, on Thursday, December 6th, 1962, commencing
at 2:00 p.m,
PRESENT WERE:
Chairman R. G. Henderson
Authority Vice - Chairm.W. C. Davidson
Members H. M. Griggs
C. H. Hiscott
R. E. Jones
A. Macdonald
F. J. McKechnie
A. E. Reeve
J. S. Scott
V. Vignale
Representatives of H. G. Acres Limited
Representatives of James F. MacLaren Limited
Secretary - Treasurer F. L. Lunn
Dir. of Operations K. G. Higgs
Asst. Dir. of Operat. E. F. Sutter
MINUTES:
The Minutes of Meeting No. 2/62 were presented.
Res. #9 Moved By:- C. H. Hiscott
Seconded By:- J. S. Scott
RESOLVED THAT- the PMIinutes of Meeting No. 2/62
as presented, be adopted.
Carried Unanimously.
STAFF PROGRESS REPORT:
Res. 410 Moved By:- V. Vignale
Seconded By:- C. H. Hiscott
RESOLVED THAT:- the Staff Progress Report
dated December 6th, 1962, be received and appended
as Schedule of these Minutes.
Carried Unanimously.
NOTICE TO PROPERTY OWNERS:
Res. 7'111 Moved By:- J. S. Scott
Seconded By:- R. E. Jones
THE BOARD RECOMMENDS THAT: - property owners
having property which is being entered upon for
survey or other purposes of the Authority
be notified by written notice by the Staff of
the Authority prior to said entry;
Carried Unanimously.
PROJECT F -13 -B - DON WATERSHED - PRELIMINARY ENGINEERING STUDY:
Representatives of H. G. Acres Limited presented a Preliminary Engineering
Report of the Don Watershed.
C -11
- 2 -
Res. #12 Moved By:- F. McKechnie
Seconded By :- C. H. Hiscott
THE BOARD RECOMMENDS THAT : - the report of H. G.
Acres Limited "A Study of the Don River Watershed"
be approved as presented, and further in this
connection, that the following action be taken:
(a) That copies of this report be forwarded to
the Conservation Authorities Branch of the
Department of Lands and Forests for approval;
(b) That the Authority undertake the construction
ofWillowdale and Finch Reservoirs, as recommended
in the said report, under the Plan for Flood
Control and Water Conservation;
(c) That the Staff be authorized and instructed to
proceed as quickly as possible with the acquisition
of the necessary lands for the Willowdale and
Finch Reservoirs under the provisions of the
Conservation Authorities Act;
Carried Unanimously.
BAYVIEW ESTATES RATEPAYERS ASSOCIATION -- WILLOWDALE RESERVOIR:
Res. #13 Moved By :- J. S. Scott
Seconded By :- W. C. Davidson
THE BOARD RECOMMENDS THAT : - a copy of the Don Watershed
report be made available to the Bayview Ratepayers
Association;
Carried Unanimously.
PROJECT F.14 - HUMBER WATERSHED - INTERIM REPORT ON HYDROLOGY:
Representatives of James F. MacLaren Limited presented an interim
report on the Hydrology of the Humber River, Main and East branches.
Res. #14 Moved By :- V. Vignale
Seconded By :- A. Macdonald
THE BOARD RECCMI.IENDS THAT : - the interim report
on the hydrology of the Main and East Branches of
the Humber River as prepared by James F. MacLaren
Limited be approved as presented; and further;
that the following action be taken in this regard:
(a) That this report be forwarded to the Conservation
Authorities Branch of the Department of Lands and
Forests, for approval;
(b) That James F. MacLaren Limited be authorized
to complete their Preliminary Engineering Report
on the basis of their conclusions reached in
the interim report.
Carried Unanimously.
1963 CAPITAL WORKS PROGRAMME ESTIMATES AND PROJECT PLANNING:
The Staff presented a proposed Capital works Programme Estimatesand
Project Planning.
Res. #15
Moved By:- A. Macdonald
Seconded By :- R. E. Jones
THE BOARD RECO- ,PCENDS THAT: - the 1963 Capital Works
Prcgrarnme Estimates and Project Planning be adopted
and appended as Schedule "3" of these Minutes.
Carried Unanimously.
C -12
- 3 -
1963 PRELIMINARY BUDGET -- GENERAL WATER CONTROL SCHEMES:
The proposed 1963 Budget for general Water Control Schemes was discussed
at some length.
Res. #16
Moved By :- A. Macdonald
Seconded By :- Vignale
THE BOARD RECOMMENDS THAT:- the Preliminary 1963
Budget for General Water Control Schemes be approved
as follows:
Stream Surveys
Massey Creek Engineering Study
Extension of Flood Warning System
Communication System Study
Etobicoke River Engineering St.
Highland Creek Engineering Study
Carried Un
PROJECT F -11 -- WOODBRIDGE CHANNELIZATION:
communication was presented advising that the
Channel is now virtually complete.
Moved By :- W. C. Davidson
Seconded By :- F. McKechnie
A Staff
Control
Res. 117
2,500.00
10,000.00
10,000.00
10,000.00
10,000.00
10 , 000.00
52,500.00
Woodbridge Flood
THE BOARD RECOMMENDS THAT: - the Staff be authorized
to arrange for a suitable opening ceremony for
the Woodbridge Flood Control Channel in the Spring
of 1963 in colunction with the Village of Woodbridge
and the Toronto and York Roads Commission;
Carried Unanimously.
ETOBICOKE RIVER -- PROPOSED ENGINEERING STUDY:
A Staff communication was presented requesting that consideration be
given to undertaking a Scheme for bank stabilization on the Etobicoke
River between the Queen Elizabeth Highway and the C.N.R. right -of -way
and suggested that the preliminary engineering be undertaken in 1963.
Res. #18 Moved By:- A. Macdonald
Seconded By:- H. M. Griggs
THE BOARD RECOMMENDS THAT:- the Staff be authorized
to obtain a proposal from M. M Dillon & Company
Limited; consulting engineers, , for the undertaking
of a preliminary engineering study of erosion
control and bank stabilization measures required on
the Etobicoke River between the Queen Elizabeth Highway
and the C.N.R. right -of -way;
Carried Unanimously.
SCHEME W.C.-37-:- EXTENSION OF THE FLOOD WARNING SYSTEM:
A Staff report was presented outlining the work proposed to be undertaken
daring 1963 for the further extension of the Flood Warning System.
Res. #19 Moved By:- C. 11. Hiscott
Seconded By :- V. Vignale
THE BOARD RECOMMENDS THAT:- Scheme W.C.-37 -- SPA
Scheme for the Extension of the Flood Warning Systemi7
be adopted; and further in this connection, that the
following accion be taken:
- 4 -
(a) That all munk ipalities be designated as
benefitting;
(b) That the Minister of Lands and Forests be requested
to approve of the Scheme and a grant of 50% of
the cost thereof;
(c) That the Department of Lands and Forests,
Conservation •authorities Branch, be requested
to design a Recording Stream Gauge for each
of the following locations:
1. (i) Main Branch of the Humber River - Albion Hills;
(ii) East Branch of the Rouge River;
(iii) ''lest Branch of the Humber River at Kipling Ave.,
2. a Recording Rain Gauge on the site of the
proposed Milne Dame and Reservoir;
(d) That following the approval of the Scheme by the
Minister of Lands and Forests, the Staff, in
co- operation with the Department of Northern
Affairs and National Resources, be authorized
to construct the Stream Gauges and a Rain Gauge
to the extent of the Budget allotted for this
purpose during 1963.
Carried Unanimously.
COMMUNICATIONS SYSTEM -- PROPOSED STUDY:
A Staff communication was presented recommending that a complete study
of a proposed Communications Network and Supervisory Control System
for the operation of the Flood Forecasting System together with the Dams
and Reservoirs to be constructed under the Plan for Flood Control and
Water Conservation.
Res. #20 Moved By:- W. C. Davidson
Seconded By :- A. Macdonald
THE BOARD RECOMMENDS THAT:- a proposal be obtained
from James F. MacLaren Limited, consulting engineers,
for a study of a Communications Network and Supervisory
Control System for the operation of the Flood Forecasting
System together with Dams and Reservoirs to be constructed
under the Plan for Flood Control.
Carried.
ADJOURNMENT:
On Motion, the Meeting adjourned at 5:10 p.m.
R. G. Henderson F. L. Lunn
Chairman Secretary- Treasurer
SCT l?'i7 �E_ ^' LOOD CQNTROL & WAT.Lik CONS .bKVhTIOW hDVI:ORY BOAR)
Staff Progress Report
December 6, 1962
FLOOD CdNTROL PL,,N
Black Creek Shannel - Scarlett Road to Rockcliffe Blvd:
- Construction of this phase is now about 90, complete
Black Creek Channel - Rustic Road to ',Jilson Avenue.:
- Qontract has r,een awarded and work has commenced
- Construction is 15% complete
Black Creek Channel - Rockcliffe Blvd. to Louvain Street:
- Final design and preparation of contract documents in
progress for this section which is proposed for con-
struction in 1963.
•t Woodbridge Channel:
- Construction phase of this project is now virtually
complete except for some.minor cleaning up
- Approval is now been given for the necessary seeding
and •soddi'ng which will be carried out in the spring
of 1963.
- Fencing of property boundaries will be carried out as
a winter works project by authority staff.
Don Watershed:
- The preliminary engineering study for reservoirs on
the Don Watershed has been completed
Humber Watershed:
- The preliminary engineering study for reservoirs on
the Main and East branches of the Humber River is
nearing completion.
- An Interim Report on Hydrology has been prepared.
Clairville Reservoir:
C -14.
- Contract documents for the control gates have been
completed and submitted to the Province for approval
prior to calling for tenders.
- Contract documents for the dam and the diversion of
the Indian Line will be complete before the end of the
year.
Snelgrove Reservoir:
- Preliminary engineering report is now complete in
draft form.
Flood Plain Lands:
- Substantial acreages of flood plain lands have been
acquired. However, exact figures will not be available
until the Property Division has completed its progress
report.
(OVER)
C -15
- 2 -
FLOOD CONTROL SCH&',ES & STUDIES
Mimico Creek Engineering Study:
- This study is now practically completed
Scheme WC-34 - Channel Improvements on Highland Creek:
Jork has bean resumed on this scheme as a winter
works project.
Extension of Flood :+arning System:
- The 1962 programme for the extension of the flood
warning system has been completed.
Massey Creek Channel Improvements:
- The proposed engineering study of the Massey Creek
Channel Improvements is awaiting the approval of the
Provincial Government.
- The staff are preparing a scheme for implementing
these channel improvements as a winter works project.
E. F. Sutter,
s►ssistant Director of Operations.
EFS /js
Nov.30 /62
SCHEDULE s ►B s►
METROPOLITAN TORONTO AND REGION CONSERVATION AUTHORITY
.FLOOD CONTROL AND WATER CONSERVATION
CAPITAL WORKS PROGRAMME
1963 ESTIMATES
SECTION .1:
PLAN FOR FLOOD CONTROL AND
WATER CONSERVATION
1963 PROJECT PLANNING ITEM
(a) All Municipalities Benefitting
SCHEDULE "A �►
Reservoir Land $ 1,240,000.
Engineering
F -1 Claireville Reservoir $00,000.
F -11 Woodbridge Channelizat. 30,000.
F -12 York Mills
SCHEDULES "C v/ & ”Du
Acquisition of Flood Plain
• & Small Reservoir Sites 671,000.
(b) Metropolitan Toronto Bene-
fitting
B -1 Scarlett Rd. to Rock -
cliffe
B -2 Rustic Rd. to Wilson
B -3
GRAND TOTAL:
C -16
TOTAL
$ 2,070,000.
671,000.
115,242.
1,029,546.
$91,960. 2,036,74$.
$ 4,777,74$.
Government of Canaria.
Province of Onta-^-L o
Authority
(All Municip alities
370
376
25 %
Benefit)
SCHEDULE t"k"
LARGE DAMS AND RESERVOIRS
PROJECT 1962 1963 1964
Reservoir Land 1,240,000. 1,170,000.
Claireville 559,602.57 800,000. 900,000.
Ebenezer
Bolton
Nashville
King Creek
54,163.14
224,145.93
43.14
20,171.09
Lower East Branch 170,$99.$5
Finch
Willowdale
Woodbridge
York Mills
P.E. Don
P.F. Humber
88,944.86
178,769.35
657,187.06 30,000.
22, 093.75
51,479.13
67,350.05
1965 1966
1967 1968 1969 1970
TOTALS
NOTE:
2,096,849.92 2,070,000. 2,070,000.2,070,000 2,070,000. 2,070,000.2,070,000. 2,400,000.2,400,000.
This Schedule is based on the necessity of devoting a large portion
of Reservcir Sites. The only construction project scheduled is the
impossible at this time to schedule other works and it could appear
projects might have to be delayed until about 1966 or 1967.
of available funds for the acquisition
Claireville Dam and Reservoir. It is
that further construction on any
PROJECT
SCHEDULE i,Bc'
BLACK CREEK
Government of Canada 371%
Province of Ontario 371%
Metropolitan Toronto 25 %
(Benefitting municipality
1962 1063 1964 1965 _1966_ , 1967 _ 1968 1969 1970
B -1 Scarlett Rd. to
Rockcliffe 35$,252. 115,242.
B -2 Rustic Rd. to
Wilson
B -3
1,029,546.
$91,960.
TOTAL
' 358,252. 2,036,748. 330,000. 330,000. 330,000. 330,000. 330,000. 330,000. 330,000.
NOTES: On the basis of the Municipal Levy, a total of $2,395,000. can be expended on the Black Creek
during 1961, 1962, and 1963.
At the present time committed expenditures amount to $1,503,040. The next phase of the
Black Creek can therefore involve an expenditure of $891,960. including the acquisition of
lands not.presently committed, engineering and construction.
PROJECT
SLririUL1 "U" rrovince oz untiario >vyo
Authority 50% c
SMALL DAMS AND RESERVOIRS (all municipalities N
benefitting) `O
1 62 1963 1964 1965 1966 1967 1968 1969 197)
P -1 Snelgrove 115,461.82
P -2 Milne 52,648.68
P -3 Percy 264.60
P -13 Engineering Study
Duffin 20,999,23
TOTAL 189,374.33
SCHEDULE "D"
FLOOD PLAIN LAND
PROJECT 1962 1963 1964 1965 1966 1967 1968 1969 1970
Etobicoke 1,318.90
Mimico 94.97 _ _
Humber 936,857.04
Don 130,557.07
Highland 4,713.75
Rouge 342,974.37
Duffin 128, 298.09
TOTAL 1,544,814.19
TOTAL "C' &
"D"
1,734,188.52 671,000. 671,000. 671,000. _ 671,000. 671,000. 671,000. 506,000. 506,000.
.NOTE: Considerably_ mare. Flood_.P1ain.Land has been. acquired in ,1962 using funds collected_ for 1961 and 1962. Committments
have also been made for a considerable portion of monies available for 1963. It is proposed to acquire Reservoir Sites
and Flood Plain Land to the extent of the monies available, and construction of projects is not scheduled. With the
available funds, it would app°ar that construction cannot star. until 1967 or 1968.
Metropolitan, aron,to anal legion
Con4,?ruation, GGtYLONGt
"ik H U
ES
C -20
Flood Control & Water Co.o.servat; on Ad t ory Board Jan. 24/63 #4/62
The Flood Control and Water Conservation Advisory Board met in the
Board Room, 17 M__11 Strc.;t, on Thursday, January 24th, 1963, commencing
at 2 :00 p.m.
PRESENT WERE:
Authority Chairman
Advisory Board Chairman
Vice - Chairman
Members
3.:crotary- Treasurer
Asst. Dire ;tor of Operat.
R. K. Kilborn & Assoc.
Dr. G. Ross Lord
R. G. Henderson
W.
W.
H.
R.
A.
F.
A.
J.
V.
K.
F.
E.
W.
J. H. ggart
C. Davidson
M. Griggs
E. Jones
Macdonald
McKechnie
E. Reeve
S. Scott
Vignale
G. Waters
L. Lunn
F. Sutter
A. Scott
� I iU'i'ES:
'ire Minuted of Meeti .14; No- 3/62 we-s3 pa eent:;c%
Res. #21 Moved By:- K. (- Waters
Seconder! By- a_ C. Davidson
RESOD E2 J 11 ':ri . • i iie ill Thutc: ] of i i:.:.ti ig Fc. 3/62 as
preooli ,eth iptcd,
linoni mously.
PROJECT P -•13 •••- STUOI - - -- DUFFIN CREEK BASIN:
!Ir. Scott of R. Kilborn & 1s,- ocintec --)resented a report of the
°rolimi n &ry Engineering Stud/ of the Duffin Creek Watershed. The report
was considered in detail.
es, J22 Moved L'y: - A. E. Reeve
Seconded By:- J. S. Scott
THE BOARD RECOMMENDS THAT:- the report for Flood
Control and Water Conservation on the Duffin Creek
Watershed, as prepared by R. K. Kilborn & Associates,
be approved as presented, and further in this
c'onaection that the following action be taken:
That copies of the Report be forwarded to the
Conservation Authorities Branch, Ontario Department
of Lands and Forests, for approval;
That the revised Arthur Percy Dam, as recommended
in the iLeport, be constructed under the Plan
or' F1 ood Control and Water Conservation;
That th3 Authority confirm its policy of the
ccqui m..ticn of the :Lcr::ei Duf'f:in Flood Plain Lands;
Th; t',13 Gr; cr. Rifer Dan a:'d Resorvoir be abandoned;
C -21
- 2 -
'(e) That the construction of Dykes and the construction
• of the Clarkes Hollow Dam and Reservoir be
deferred;
Carried Unanimously.
PERMANENT SIGNS -- FLOOD CONTROL PROJECTS:
The matter of designing and erecting permanent signs for the completed
Flood Control Projects was discussed at some length.
Res. #23 Moved By:- W. J. Haggart
Seconded By :- R. E. Jones
THE BORD RECOMMENDS THAT:- the Staff be directed to have
designed suitable permanent signs for Projects completed
under the Plan for Flood Control and Water Conservation.
Carried Unanimously.
PROPOSED DAM -- ROUGE RIVER AT FINCH AVENUE:
A Staff communication was presented advising that a recommendation had
been referred from the R.D.H.P. Advisory Board in connection with studying
the feasibility of the construction of a Dam on the Rouge River in the
vicinity of Finch Avenue and Sewell's Road, which might include a
combined crossing for Finch Avenue. The matter was discussed at some
length.
Res. #24 Moved By: - K. G. Waters
Seconded By :, A. E. Reeve
THE BOARD RECOMMENDS THAT:- the Staff be authorized
and directed to obtain a proposal from R. K. Kilborn
& Associates, Consulting Engineers, to undertake a
Preliminary Engineering Study to determine the
feasibility cf combining a Dam and major Bridges on the
Rouge River in the vicinity of Finch Avenue and
'Sewell's Road; and further in this regard -•- that the
Minister of Lands and Forests be requested to approve a
grant of 750 of t- cost of this Preliminary Engineering
Study;
Carried Unanimously.
FLOOD WARNING SYSTEM -- PROPOSED AERIAL PATROL:
A Staff report was lresented suggesting that consideration be given to
establishing an aerial patrol of the river valleys under the jurisdiction
of the Authority.
Res. #25 Moved By:- Dr. G. Ross Lord
.Seconded By:- W. J. Haggart
THE BOARD RECOMMENDS THAT:- an aerial patrol be established
in conjunction with the Municipality of Metropolitan
Toronto on a trial basis, and further in this connection,
that the following action be taken':
(a) That the MMIunicipality of Metropolitan Toronto be
requested to participate in the proposed
programme of aerial inspection of the river
valleys and to assume 50% of the cost thereof;
(b) That when the approval of the Municipality of
Metropolitan Toronto has been received, that the
Staff be requested to enter into an Agreement
with Dominion Helicopt,rs Limited for periodic
inspections of the river valleys on a 1 -year trial
basis in accordance with the terms outlined in their
proposal dated November 16th, 1962;
Car]•ied Unanimously.
C -22
- 3 -
PROJECT F -12 -- YORK MILLS CHANNEL IMPROVEMENTS:
A Staff communication was presented advising that it was necessary to
ccnstruct the Flood Control Channel at York Mills in conjunction with
the construction of a trunk sewer by the Municipality of Metropolitan
Toronto and suggesting that final azgineering be proceeded with immediat
ly.
Res. #26 Moved By:- K. G. Waters
Seconded By:- H. M. Griggs
THE BOARD RECOMMENDS THAT:- the Staff be authorized
and directed to instruct the firm of W. 0. Chisholm
Associates, Consulting Engineers, to proceed immediately
with the final design and the contract documents for
the York Mills project -- Project F -12 -- between
Donino Avenue and the Rosedale Golf Club;
Carried Unanimously.
PROJECT F -1 -- CLAIREVILLE DAM & RESERVOIR -- SOD- TURNING CEREMONIES:
Res. #27 Moved By:- F. McKechnie
Seconded By:- V. Vignale
THE BOARD RECOMMENDS THAT:- the Information and Education
Advisory Board be requested to arrange a suitable Sod - Turning
Ceremony to mark the coenceme-it of the Claireville Dam
and Reservoir;
Carried Unanimously.
PROJECT F -11 - WOODBRIDGE FLOOD CONTROL CHANNEL -- FLOOD PLAIN LANDS
- MASTER PLAN OF DEVELOPMENT:
The Master Plan for the development of the Woodbridge Flood Plain Lands
acquired in connection with Project F -11 was referred to the Board
for their consideration.
Res. #2$ Moved By:- R. E. Jones
Seconded By:- A. Macdonald
THE BOARD RECOMMENDS THAT:- the recommendations in
connection with the Woodbridge Flood Blain Lands as
recommended by the Conservation Areas Advisory Board
be approved;
Carried Unanimously.
ETOBICOKE RIVER AT DUNDAS STREET:
Mr. McKechnie advised that the use of land in the vicinity of the
Etobicoke River and Dundas Street was being studied by the Township of
Toronto and in this connection certain problems had been encountered.
Res. y; #29 Moved By:- F. McKechnie
Seconded By:- V. Vignale
RESOLVED THAT:- the Staff be authorized and directed
to obtain a proposal for an engineering study of Flood Control
for the Etobicoke River in the vicinity of Dundas Street•
and to further prepare a report on the status of the
Etobicoke aims located on the East side of the Etobicoke
River South of Dundas Street;
AND BE IT FURTHER RESOLVED THAT:- a report on the filling
and dumping carried out in the vicinity of the area known
as Markland Woods on the East bank of the Etobicoke River
North of Dundas Street, be made available;
Carried Unanimously.
On Motion, the Meeting adjourned at 4:30 p.in.
R. G. Henderson F. L. Lunn
Chairman Secretary- Treasurer